Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout188-056 • • PTO. /06 -1,5-e. Loepp, Victoria T (DOA) From: Loepp, Victoria T (DOA) Sent: Tuesday, February 23, 2016 9:58 AM To: 'Sternicki, Oliver R' Cc: Lastufka,Joseph N (Joseph.Lastufka@bp.com) Subject: Suspended Clarification(PBU 03-05(PTD 176-057); G-03A(PTD 197-070); Y-08A(PTD 188-056) Oliver, The wells need to be brought to a mechanically sound condition with plugs in accordance to 20 AAC 25.112. A surface plug may not be required at this time if the wells are otherwise mechanically sound. However,these wells must be included in the development of a P&A plan for suspended wells with no future utility that must be approved through the Commission by 12/31/16. Thanx, .__. . ._.... _ Victoria Victoria Loepp Senior Petroleum Engineer ofAlaska Oil& RPR 2 1 1016 Oil Gas Conservation Commission scow 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loeoi(aialaska.00v CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepo@alaska.gov From: Sternicki, Oliver R [mailto:Oliver.Sternicki@bp.com] Sent: Tuesday, February 09, 2016 3:20 PM To: Loepp, Victoria T(DOA) Cc: Catron, Garry R(Wipro); Lastufka, Joseph N; AK, D&C Well Integrity Coordinator Subject: Clarification Request: Well status change to Suspended Victoria, In reviewing our Not Operable well stock I came across 3 wells that we would like to convert to suspended status. I need a bit of clarification on what we need to do to change them over. • 03-05, PTD#176057 o Failed RWO in 1991-Tubing pulled, EZSV with cement cap set in the 9.625" casing. For some reason this well did not have a PT in 1991 when the rig moved off of it. I assume that if we apply for a suspension we will need to get a PT. o No future utility • G-03A, PTD# 197070 o RWO suspended on 10/25/06 when the rig found holes in the production casing between 5262-5291'. A EZSV was set at 5096' and a 4.5" kill string was run to 5015'. o PT passed to 3500 psi on 10/24/06 1 • • o No future utility • Y-08A, PTD# 188056 o This well has a P&A sundry open (314-595), but we are unable to close it out because we have not been able to get a PT on the cement job that was performed in late 2014. TOC was tagged at 8597', but there is a tubing leak at 4390' and a production casing leak at 2700'. o No future utility Please advise on what is required for each of these to get them moving towards SU status. Regards, Oliver Sternicki 00380 wa4s}orgsnv, Well Integrity Engineer BP Exploration Alaska Office: 1 (907) 564 4301 Cell: 1 (907) 350 0759 oliver.sternicki(a bp.com 2 TREE 4"CIW S Y NOTES:WELL ANGLE>70° 11383' ""MAX GRAY . Y-O$A :16.6°@ 11572'"""CHROME LNR'"" ACTUATOR= AXELSON PREVIOUS WELLBORE NOT SHOWN NT1AL KB.ELE 87.12' BF.ELEV= 50.30' KOP= 2100' 2091' HGAS 4-112"LFT CAMCOMANDRELS SSSV NP,D=3.813" Max Angle=88" @ 11656' —"CONDUCTOR, H ? CD II I Datum MD= 11242' —#, Datum TVD= 8800'SS D= 2610' _19-5/8"DV COLLAR 9-5/8"CSG-PATCH,47#, -{ 2526' = L-80 NSOC,D 8.681" ST MD TVD DEV TY FE VLV LATCH SIZE DATE 13-3/8"CSG,72#,L-80 BUTT,D=12.347" H I 2712' 4 3221 3083 38 MERLA DMY RM 0 07/03/05 3 6364 5329 46 MERLA DMY RM 0 07/03/05 2 8640 6927 47 MERLA DMY RA 0 01/07/89 TOP OF CEMENT(12/15/14) H 8597' 4.,,,4 1 8747 7000 47 MERLA DMY RM 0 07/03/05 Minimum ID = 3.725" @ 8992' ' ' 8816' -14-1nND 'OT1S SLDG SLV =3.813" 4-1/2" OTIS XN NIPPLE 8859' H4-1/2"CEMENT RETAINER(12/14/14) 8885' 8-1/4"TM/OVERSHOT SEAL ASSY ,D=4.00" I IlI � 8901' 9-518"X 4-1/2"11W HBBP PKR,D=4.0" ►III I 1!!!!�'� �t X14°141,CA 8905 —15-1/7 MELOUT EXTENSION,D=4.778" l►lll�� 8910' --15-1/2"X 4-1/2"XO,D=3.958' 1! '�•• 8951' 14-1/2"OTIS X MP,D=3.813" ►!I!I ►!fl•1 eie 8992' -,4-1/2"OTIS XN NP,0=3.725" 4-1/2"TBG,12.6#,L-80 AB MOD BUTT, --I 9031' �!� 9032' -I 4-1/2"X 5-1/2'XO D=3.958" ►!!!! .0152 bpf,13=3.958" S/I 1111/4 9027' 9-5/8"x 5-1/2"TIW RP HYD HGR, TOP OF 5-1/2"X 4-1/2"LNR -I 9027' „�l � -� " !I!I!li w/6'TE`BACK,113= !I!I!I1 I!jlll11 9038' 15-1/2"X 6'11W SEAL ASSY !I!I!I w/oSEALS,D=4.87' %4 ___ Ate 95/8"MLLOUT SECTION WINDOW 9290'-9350' 1 11356' H5-1/2"PORTED COLLAR D=4.892" 1.1 111 ! ! � II `I �4�1�!!�l,,��.► 11401' -{5-1/2"CTC EXT CSG PKR aI'I ylllll�C 0.2. 11516' 5-1/2"X 4-1/2"XO,D=3.958" Iylilil ` 4A44il�liI' H !!!!!{!,'SCF` ♦! ,♦,I,• 9-5/8"CSG,47#,L-80 BUTT,D=8.681" --1 11404' l!I!I!IlI/I�/!IZ/' ��y�4P,AI FV` . ;;4,•`I`I`v,;;.;., ,i liNO. IteNol ." '4.4‘ ' ' PERFORATION SUIMAARY I a`!k%A,4%%%% REF LOG:PYA 5-1/2"LNR,17#, ---I 11517' •t�► SM-13CR-80 VAM ACE, �• ! ANGLE AT TOP PERF:WA !+ Vitplibi Note:Refer to Ikoduction DB for historical pert data .0232 bpf,D=4.892" ` le SIZE SFF NTERVAL Opn/Sgz SHOT S(17 4-1/2" SLTD 11516-12573 0 09/01/88 4-1/2"SLOTTED LNR,12.6#,TDS, H 12575' .0152 bpf,D=3.958' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/23/81 N-18E ORIGINAL COMPLETION 12/16/14 TFA/JMDCMT RETANER/CMT(12/14-15/14) WELL: Y-08A 09/02/88 N-18E SIDETRACK(Y-08A) PERMIT No: 1880560 07/22/07 JYJ/PJC DV COLLAR CORRECTION API No: 50-029-20572-01 08/27/13 MACJJMD DN COLLAR CORRECTION Sec.34,T11 N,R13E,1363'FM_&10'FWL 11/05/14 PJC CLEANUR PRESUSPENSION 11/07/14 PJC LOCATE TALLES-UPDATE W BS BP Exploration(Alaska) bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20, Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 20, 2010 JAN V.4 Mr. Tom Maunder f! 3 2111 g Alaska Oil and Gas Conservation Commission 333 West 7 Avenue ' °� '�� '� AiS.17, -. aSiOt� Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Y Pad 8 Dear Mr. Maunder, \ I — 3 Enclosed please find multiple copies of a spreadsheet with a list of wells from Y Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • . BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 12 /20/10 Corrosion Well Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal Y -01B 2010760 50029203940200 NA _ 2.5 NA 8.50 4/11/2010 Y -02A 2011730 50029203950100 NA 0.1 NA 0.85 4/11/2010 Y -03A 2042350 50029204110100 NA 2.2 NA 18.70 4/16/2010 Y -04 1791050 50029204230000 NA 1 NA 5.10 4/11/2010 Y -05B 2081380 50029204360200 NA 3.3 NA 20.40 4/15/2010 Y -06A 2042510 50029204310100 NA 0.7 NA 3.40 4/16/2010 Y -07A 2071050 50029205600100 14.5 2.0 0.3 NA 1.70 8/4/2010 i > _ Y - 08A 1880560 50029205720100 NA 4 NA 15.30 8/5/2010 • Y -09A 1970830 50029205790100 19 1.5 3.6 NA 17.00 8/4/2010 Y -10A 2042500 50029205870100 19 3.0 8.75 NA 54.40 8/6/2010 Y-11C 2051640 50029205130300 NA 0.1 NA 0.90 4/14/2010 Y -13 1811120 50029206340000 NA 0.4 NA 3.40 4/15/2010 Y -14B 2011010 50029218320200 NA 3.8 NA 20.40 4/10/2010 Y -15A 2010890 50029209400100 NA 2.1 NA 11.90 4/10/2010 Y -16 1830490 50029209320000 18.8 2.0 1.7 NA 10.20 8/4/2010 Y -18 1830290 50029209160000 y NA 0.8 NA 5.10 4/9/2010 Y -19 1880960 50029218570000 NA 0.2 NA 0.85 4/15/2010 Y -20A 2010250 50029215870100 NA 1.5 NA 11.90 4/14/2010 Y -21A 1950370 50029215740100 NA 0.1 NA 1.70 4/13/2010 Y -22A 1881150 50029215580100 NA 0.5 NA 3.40 8/4/2010 Y - 23B 2031640 50029215900200 NA 1.2 NA 6.80 4/13/2010 Y -24 1861130 50029216080000 NA 1 NA 6.80 4/12/2010 Y -25A 2081400 50029218830100 NA 0.3 NA 1.70 4/18/2010 Y -26A 2010430 50029221910100 NA 0.3 NA 1.70 4/15/2010 Y -27 1900280 50029220190000 NA 0.5 NA 3.40 4/14/2010 Y - 1910650 50029221690000 NA 3.5 NA 28.90 4/12/2010 Y - 29A 1960910 50029221230100 NA 0.2 NA 1.70 4/13/2010 Y -30 1910150 50029221350000 NA 0.5 NA 2.60 4/13/2010 Y -31 1910560 50029221610000 NA 0.5 NA 3.40 4/12/2010 Y -32 1910410 50029221490000 NA 0.3 _ NA 1.70 4/18/2010 Y -33 1910300 50029221440000 NA 0.9 NA 6.80 4/12/2010 Y -34A 1990040 50029221780100 NA 0.9 NA 5.10 4/11/2010 Y - 35A 2022370 50029221860100 NA 1.5 NA 10.20 4/15/2010 Y -36 1931310 50029224000000 NA 0.9 NA 5.95 4/10/2010 Y -37A _ 2020460 50029224030100 NA 0.8 NA 6.00 4/14/2010 Well Job# LOQ DescriDtion Date BL Color CD C-11A 11225983 LDL. 07/02/06 1 B-25 11217247 LDL 05/11/06 1 F-06A 11258688 PROD PROFILE W/DEFT 03/20/06 1 G-18A 11209612 MEM INJECTION PROFILE 07/19/06 1 P-24 11216206 MEM INJECTION PROFILE 07/06/06 1 B-28 11221590 LDL 07/04/06 1 B-01 11211508 PROD LOG W/DEFT 06/23/06 1 W-39A 11216197 MEM PROD PROFILE OS/29/06 1 Z-02A 11212856 INJECTION PROFILE 05/02/06 1 G-03A 11211493 LDL. OS/24/06 1 C-26A 11225979 LDL 06/07/06 1 F-26B N/A MEM PROD & INJECTION 06/06/06 1 F-26B N/A MEM BORAX LOG 06/06/06 1 W-39A 11216197 MEM BORAX LOG OS/29/06 1 F-04A 11221602 SCMT 08/18/06 1 Y -08A 11221604 SCMT 08/20/06 1 C-06B 11212883 USIT 08/15/06 1 X-27 11217274 USIT 08/26/06 1 K-07D 10942217 MEMORY SCMT 06/15/05 1 Y-1OA 11209611 MEM INJECTION PROFILE 07/18/06 1 F-12 11225984 LDL 07/02106 1 K-07D 11058256 SBHP SURVEY 11/28/05 1 X-04 10919925 PROD PROFILE W/DEFT 12/15/04 1 A-30A 11054295 CH EDIT OF PDC LOG W/GR 04/06/05 1 17-04B 40010183 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 03/09/04 1 1 Z-30A 40010092 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 01/27/04 1 1 17-04B PB1 40010183 OH EDIT OF MWD/LWD 03/08/04 2 1 Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ¡1% -066 en 1 4: 20Dô SCANNED S L r - Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 R·.. .'.' -r - ~ ~ '<, : :.~"_.. .\ '. ~".r;~ :~.~ ,) ~_.,...,. 08/28/06 .) I_I .ì.,., ~\J\.¡Ò NO. 3941 ~~11 & Gas Cons. COlT'~ ,<\nchDrage State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Company: Field: Prudhoe Bay . . Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Z-01 Y-13 '..';?1 "-'~ Y-08A /ßB -CbCf> X-36 X-30 s-29A P2-01 Ds 12-08C 0.5. 09-28A P2-34 Q-05A NK-09 NK-38A BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Job # 11087166 N/A 10670029 11047356 11075908 10662<":\73 11087187 11072880 11087208 11094347 N/A 11087203 11062632 11075902 E- < f\ (';' &1\ ô ')f)Íjh GJr'b.t\.'M'~!rf¡ h~.!~ 6. V ,,.lJÿV \~\¡;1OC\\U~ßt1 lL-:d' ~~ t ~ ,Ie t-.-; Log Description LDL PRODUCTION LOG PROD PROFILE MEMORY/SENSA LDL MEMORY INJECTION PROFILE IGLS INJECTION PROFILE LDL sBHP SURVEY LDL INJECTION PROFILE sBHP SURVEY PROD PROFILE W/DEFT MEMORY PROD PROFILE Date 08/05/05 05/01/05 08/20/04 10/15/05 08/17/05 12/02/03 10/04/05 08/06/05 12/24/05 12/28/05 06/02/05 11/27/05 07/01/05 07/27/05 01/04/06 NO. 3642 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay, Milne Pt. BL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Color CD --- Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ Receivedb~tJ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: HOUSTON ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS ARCHIVES DATE: 09/06/89 TS: 80333 BP FINAL DATA - PRESSURE SURVEY DATA Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. W-05 Static Gradient 08/16/89 Camco C-26 BHP Survey 08/22/89 HRS U-09 BHP Survey 08/21/89 HRS Y-07 BHP Survey 08/21/89 HRS Y-08A BHP Survey 08/19/89 HRS Information Control Well Records LR 2-1 J. Dietz/S. McCurry ..----'-"-/% A%aStm 0il & Gas Cons. - Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 09/01/89 Transmittal: 80322 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Y-08A GLM TEMP 08/19/89 ~1 2150-9150 HRS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 08/29/89 Transmittal: 80308 From: I'nformation Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907)564-4445. C-35 TDT-P 08/22/89 ~1 9195-9628 Sch F-03 Packer Pos. 08/25/89 91 10885-11200 Sch J-06 Packer Setting 08/23/89 91 0-2130 Sch 5" N-22 Completion 08/24/89 91 9600-10816 Sch 5" R-13 Completion 08/22/89 91 8820-9882 Sch 5" W-26 CBT 08/24/89 91 11125-11908 Sch W-26 CET 08/24/89 91 11125-11928 Sch 5" W-26 Completion 08/24/89 93,4,5 11090-11880 Sch 5" Y-08A PROD 08/23/89 #1 11400-12500 Sch Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ARCHIVES BP EXPLORATION 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 4, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well. Y-8A (32-03-10-13) PBU Gentlemen: Enclosed, in duplicate, .is Form 10-404, Report of Sundry Well operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, ~oduction Engineering J. A. Bragg ~ JAM: JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File .- , STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COIVl .... 5SION REPORT OF SUNDRY WELL OPERATIONS 1, Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development X Exploratory Stratigraphic Service 4. Location of well at surface 1363'SNL, IO' EWL, SEC. 34, T11N, R13E, UPM At top of productive interval 1953' SNL, 2513' WEL, SEC. 03, TION, R13E, UPM At effective depth 2724' SNL, 2276' WEL, SEC. 03, TION, R13E, UPM At total depth 2724' SNL, 2276' WEL, SEC. 03, TION, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12575feet Plugs (measured) BKB 9045feet 125:75feet Junk (measured) BKB 9345feet 6. Datum elevation (DF or KB) KBE . 87.12 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-O8A (32-03-10-13) PBU 9. Permit number/approval number 88-56 / 9-645 10. APl number 50- 029-20572-01 11. Field/Pool Prudhoe Oil Pool Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20x30 8 c.y. 147 147 Surface 2675 13 3/8 3720 c.f. 2712 2659 Intermediate 9253 9 5/8 1800 c.f. 9290 7367 Production 2484 5 1/2 493 c.f. 9033-11517 7194-8978 Liner 1058 4 1/2 SLOTTED LINER 11517-12575 8978-9044 Perforation depth: measured 11517'- 12575' true vertical subsea 8891 '-8958' Tubing (size, grade, and measured depth) 4 1/2"L-80 stabbed into top of liner at 9033' Packers and SSSV (type and measured depth) 9 5/8" TIWPBR/packerat 8901'; 4 1/2"SSSVat~2p91'~. 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or In!ection Dat~ OiI-Bbl Gas-Mcf Water-Bbl-~?E~- Casing Pressure 650 347 360 '~ ~' 1033 5O 350 1175 1043 Tubing Pressure 246 203 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17, I hereby c,e~i~rthat the foregoing is true and correct to the best of my knowledge. Signed L~~~~/'~'~ Title ManagerProductionEngineering Form 10-,~/~4Rev 06/15/88 SUBMIT IN DUPLICATE WELL Y-SA (32-03-10-13] PBL~ STIMULATION OI~ERATIONS A 15% HC1/5% xylene perforation wash via coiled tubing was performed 7/28/89 in the slotted liner from 12575' to 11600' MD in horizontal well Y-8A.. The treatment fluids were pumped as follows: 1) 2) 3) 20,000 gal. 15% HCI with 5% xylene and 1 mc/Mg of Ir 192 Went to bottom and pulled out while pumping 3000 gal. diesel. Displaced diesel with 22 bbls. treated seawater The well was returned to production immediately following the treatment, then tested. jm 8/3/89 BP EXPLORATION ORiGiiVAL BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 July 21, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well Y-8A (32-03-10-13) PBU Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, j.~~A. Bragg/~' ~ Manager Production Engineering JAM: JAM Enclosures '(9) cc: L. Burke (MB12-1) Well File Anchorago ~,..ASKA OIL AND GAS CONSERVATION COMMI,.,~ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon~ Suspend Alter casing ~ Repair well~ Change approved program ~ 2. Name of Operator BP Exploration (Alaska) inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1363' SNL, 10' EWL, SEC. 34, T11N, R13E, UPM At top of productive interval 1953' SNL, 2513' WEL, SEC. 03, TION, R13E, UPM At effective depth 2724' SNL, 2276' WEL, SEC. 03, TION, R13E, UPM At total depth 2724' SNL, 2276' WEL, SEC. 03, TION, R13E, UPM Operation Shutdown ~ Plugging __ Time extension ~ Pull tubing __ Variance__ Perforate ~ 5. Type of Well: 6. Development X Exploratory . Stratigraphic Service Re-enter suspended well__ Stimulate X Other Datum elevation (DF or KB) KBE . 87.12 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-O8A (32-03-10-13) PBU 9. Permit number 88-56 10. APl number 50- 029-20572-01 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured 12575 feet Plugs (measured) true vertical BKB 9045 feet Effective depth: measured 12575 feet Junk (measured) true vertical BKB 9345 feet Casing Length Size Cemented StructUral ........ Conductor 110 20x30 8 c.y. Sudace 2675 13 3/8 3720 c.f. Intermediate 9253 9 5/8 1800 c.f. Production 2484 5 1/2 493 c.f. Liner 1058 4 I/2 SLOTTED LINER Perforation depth: measured 11517'. 12575' Measured depth True vertical depth BKB 147 147 2712 2659 9290 7367 9033-11517 7194-8978 11517-12575 8978-9044 true vertical subset 8891 '-8958' Tubing (size, grade, and measured depth) 4 1/2" L-80 stabbed into top of liner at 9033' J ~ Alaska Oil & ~as Co~s, Packers and SSSV (type and measu red depth) 9 5/8" TIW PBR/packer at 8901'; 4 1/2" SSSV at 2091',~ , u~nc~'ora~e 13. Attachments Description summary of proposal 14. Estimated date for commencing operation July/August 1989 16. If proposal was verbally approved Name of approver Date approved Detailed operations program BOP sketch 15. Status of well classification as: Oil X Gas Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. FOR COMMISSION USE ONLY Condigns of approval: Notify Commission so representative may witness Plug integrity BOP Test~ Location clearance ~ Mechanical Integrity Test Subsequent form required 10- ~j-~/-/- - ORIGINAL SIGNED BY Approved by order of the Commission LONNIE C. SMITH Date 7./¢' Approved Copy Returned Commissioner Date -~ _~:._ ~ Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE WELL Y-8A (32-03-10-13~ PBU STIMULATION PROPOSAL A 15% HCI/5% xylene perforation wash via coiled tubing is proposed for the slotted liner from 12575' to 11600' MD in horizontal well Y-8A.. The treatment fluids will be pumped as follows: 1) 2) 3) 20,000 gal. 15% HC1 with 5% xylene and 1 mc/Mg of Ir 192 Go to bottom and pull out while pumping 3000 gal. diesel. Displace diesel with treated seawater The well will be returned to production immediately following the treatment, then tested. jm 7/14/89 Co~'Ied Tubing °' Pack-Of? ·  Bt[nd Rams ' 2" Chkzksan (Kilt Line ~ ~ j, ~ '~ P/pe Barns .Pump-tn Sub (C~rcu~ t~R e turn s) ~ett Head Swab Valve .-.., .-. BP EXPLORATION BP Exl:;toration (Alaska) Inc. 900 East 8enson Boulevarcl P.O. Box 196612 Anchorage, Alaska 99519-6612 (907} 561-5111 TO HOUSTON ARCO CHEVRON EXXON MOBIL" PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES BP CASED HOLE FINAL LOGS Date:.05-26-89 T$: 80092 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: C-36 PROD-F 05-11-89 #1 9600-9900 Camco 5" C-08 PROD-F 05-15-89 #1 9900-10235 Camco 5" D-07 PROD-F 05-10-89 #1 11450-12414 Camco 5" D-22 Leak Der. 05-10-89 #1 8150-9400 Camco 5" M-29 PITS 05-11-89 #1 9700-10206 Camco 5" INJ-F 05-15-89 #1 10150-10570 Camco 5" Y-8A GR-CL 05-14-89 #1 10800-10800 Camco 5" ~ ~ hla¢:a C, ii & Ca~. ~:,~c,. Commis3ion ~ Anchorage Shirley R. McCurry Received: Information Control Well Records LR2-1 Date: J. Dietz/S. McCurry BP EXPLORATION HOUSTON ARCO CHEVRON E~ON TEXACO 'T0: MOBIL PHILLIPS STATE OF ALASKA ARCHIVES INDEXED BP Exl3ioration (Alaska) Inc. 900 East 8enson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (9073 561-5111 Date: 05-.18-89 80071 REFERENCE: BP FINAL DATA - PRESSURE SURVEY DATA The following materfai Is being sNbmlt~red herewith. Please acknowledge receipt by signing a copy of fhis .lain'er and returning if to this office: A-34A Flo.winq Gradient 05-04-89 Camco H-3A'. Static Gradient 05-03-89 Camco H-9i Static Gradient 05-06-89 Camco K-04 Static Gradient 05-03-89 Camco K-10 Flowing Gradient 05-0~-89 Camco R-24 Static Gradient 05-05-89 Camco S-11i Static Gradient 05-06-89 Camco W-40 Static Gradient 05-13-89 Camco Y-8A Static Gradient 05-14-89 Camco W-40 Static Gradient .04-21-89 Halliburton Y-17 Static Gradient 05-1~-89 Camco Race I ved Date Shirley R. McCurry I NFORMAT I ON CONTROL Wel I Records LR2-1 BP EXPLORATION March 9, 19'89 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well Y-8A (32-03-10-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. Yours very truly, B. J. Policky Supervisor Waterflood & Miscible Flood BJP:JA~ Enclosures (9) cc: L. Burke (MB12-1) Well File 1. Type of Request: STATE OF ALASKA AL/~SKA OIL AND GAS CONSERVATION COMMIS~,,ON APPLICATION FOR SUNDRY APPROVALS Abandon __ Suspend __ Alter casing ~ Repair well Change approved program __ 2. Name of Operator BP Exploration (Alaska) inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 operation Shutdown Re-enter suspended well~ Plugging Time extension ~ Stimulate__ Pull tubing ~ Variance Perforate X Other~ 5. Type of Well: 6. Datum elevation (DF or KB) Development x KBE = 87.12 AMSL feet Exploratory ~ Stratigraphic 7. Unit or Property name Service ~ Prudhoe Bay Unit 4. Location of well at surface 1363' SNL, 10' EWL, SEC. 34, T11N, R13E, UPM At top of productive interval 1953' SNL, 2513' WEL, SEC. 03, TION, R13E, UPM At effective depth 2724' SNL, 2276' WEL, SEC. 03, TION, R13E, UPM At total depth 2724' SNL, 2276' WEL, SEC. 03, TION, R13E, UPM 12. Present well condition summary Total depth: measured 12575 feet true vertical BKB 9045 feet 8. Well number Y-O8A (32-03-10-13) PBU 9. Permit number 88-56 10. APl number 50- 029-20572-01 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 12575 feet true vertical BKB 9345 feet Junk (measured) Casing Length Size Structural -- Cemented Measured depth True vertical depth BKB Conductor 110 20x30 Surface 2675 13 3/8 Intermediate 9253 9 5/8 8 c.y. 147 147 3720 c.f. 2712 2659 1800 c.f. 9290 7367 Production 2484 Liner 1058 5 1/2 493 c.f. 4 1/2 SLOTTED LINER 9033-11517 11517-12575 7194-8978 8978-9O44 Perforation depth: measured 11517'- 12575' true vertical subsea 8891 '-8958' Tubing (size, grade, and measured depth) 4 1/2"L-80 stabbed into top of liner at g033' Packers and SSSV (type and measured depth) 9 5/8" TIW PBR/packer at 8901'; 4 1/2" SSSV at 2091' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: March 1989 16. If proposal was verbally approved Oil X Gas ~ Suspended Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- ~->+ ORIGINAL SIGNED BY Approved by order of the Commission LONNIE C. SMITH Commissioner I Approval No. ~_.,/~.~ Form 10-403 Rev 06/15/88 Approved Copy Returned SUBMIT IN TRIPLICATE WELL Y-SA (32-03-11-13~ PBU ADD'L. PERFORATION PROPOSAL We propose to perforate the following Sag River interval during February 1989: 11188' - 11223' MD BKB (Ref. MWD GR, 8/9/88) A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. jm 2/10/89 FLOW TUBES & PACKOFF BOWEN PACKOFF ~,-- HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE GREASE LINE FLOWLINE VALVE . GREASE ~MANIFOLD GREASE PUMP B +GREASE RESERVOIR OP Slanda~d Alaska Produ¢l;on Compa,., 9X~X) East ~'nson Boule¥o~d P.O. Bo~ 196612 Anchorage, Alaska 99519-66 (907~ 564-51 I I INDEXED HOUSTON ARCO CHEVRON EXXON Date: 08/25/88 TO: TEXACO Ti: 79249 MARATHON MOB IL PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD ALASKA PRODUCTION REFERENCE: ARCHIVES SAPC OPEN HOLE FINAL LOGS The following material Is belng submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this offlce: HOU/UNIT/STATE: Y-O8A MWD GAMMA Plus directional 07/18-08/19/88 #10 10850-12584 . Teleco 2"& 5" Y-08A MWD GAMMA Plus directional 07/18-08/19/88 #10 10850-12584 Teleco 2"& 5" STATE ONLY: Magnetic Single Shot Directional Survey Da~e: GyrOscopic Directiona]~Survey ;. ~jfe: Rece I ved ~ Date ~ A un~l Of lhe o~;g;nol Stondord Chi Founded in Clevelond. O~,o. ,n 1870 ' · DIRECTIONAL SURVEYS Job#: Job#: Jennifer Dietz I NFORJ~AT I ON CONTROL Wel I Records LR2-1 .~tonda~d Alaska Pwoduct~on Compony 900 Eost Benson Boulevo, P.O. ~. 1966l~ An¢horog~. Alos~a 99519-661~ (907t 564-51 I INDEXED TO: HOUSTON ARCO CHEVRON EXXON TEXACO MARATHON M--FANDARD ALASKA PRODUCTION Date: 09-22-88 79335 MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: ARCHIVES SAPC OPEN HOLE FINAL LOGS The following material is being submitted herewlth. Please acknowledge receipt by signing a copy of this letter and returning It to thls office: DAL/UNIT/STATE: Y-08A Y-08A Y-08A LDT/CNL poro CDL poro 7/19 thru 8-09/88 /tl,3,4,5,9,10 10954-12582 NL Il II I! !1 Il Il II II II II II !1 II II II !I 2"/5" I! STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Sho --Directional S_urvey~ate: ~ t --09.-88 Job/l: AL888-D26 GyrOscopic Directio!~,Surve/~i~ i ~___ ~: Job/t: Date: 8%,12--88 Job/~: 640 elved Shirley R. McCurry I NFORHAT I ON C0~ITROL Date Wel I Records LR2-1 A un~! ol the or~g~nol 5'o,~do~d C~I Co,~pony founded in Cle~elo~d C~,o. ,n 1870 ,. STATE OF ALASKA ~ '" ALASK~ ,J~L AND GAS CONSERVATION C,'-.'.,,iMISSION Wi:LL COMPLI:TION OR RI:COMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Standard Alaska Production Company 88-56 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-20572-01 4. Location of well at surface 9. Unit or Lease Name 1353' SNL, 5270' WEL, SEC. 34, T11N, R13E Prudhoe Bay Unit At Top Producing Interval 10. Well Number Y-8A (32-03-10-13) 1953' SNL, 2513' WEL, SEC. 3, TION, R13E 11. Field and Pool At Total Depth Prudhoe Bay Field/Prudhoe Bay Pool 2724' SNL, 2276' WEL, SEC. 3, TION, R13E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE -- 87.12 Feet I ADL 47471 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. orAband. 115. Water Depth, if offshore 116. No. of Completions 06-13-88 08-10-88 September2, 1988I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 12575'MD 9044' TVD 12575'MD 9044' TVD YES [] NO []I 2091 feet MD 2056' 22. Type Electric or Other Logs Run LD T/CNL poro, EWR/GR, CDL poro, MWD plus Directional 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" X 30" Conductor Surface 110' 8 cu yds Concrete 13-3/8" 72# L-80 Surface 2712' 17-1/2" 3720 cu fl Existing 9-5/8' 47# L-80 Surface 9290' 12-1/4" 1800 cu fl 5-1/2" 17# SM 13CR 9051' 11516' 8-1/2" 493 cu ft Class G 4-1/2" 12.6# TDS 11516' 12575' 8-1/2" Uncemented Slotted Liner 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET IMD) 4-1/2" Slotted Liner 4-1/2" 12.6~ 9031' 8901' 11517' - 12575' MD L-80 AB Mod 8899' - 8903' TVDss 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) September .1, 1988 I Fiowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL ~AS-MCF WATER-BBL Ci-K~ESIZE IGAS-OIL RATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. Submit in duplicat~ Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS ~ ' .... -p~,r~MATION TESTS " NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. SUBSEA SAG 11188' 8774' SHUBLIK A 11223' 8792' ZONE 4 ' 11775' 8897' ..... 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ? -/,/ _ _ /,. '/ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. item 28: If no cores taken, indicate "none". Form 10-407 · STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover June 13, 1988 at 0600 hrs Rig: Nabors 18E AFE # 160413 (Expense) Well' Y-8A (32-03-10-13) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: -1 Current Operation: Moving rig. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover June 14, 1988 at 0600 hfs Rig: Nabors 18E AFE # 160413 AFE Amount: (Expense) Well: Y-8A (32-03-10-13) AFE # 120710 (Investment) AFE Amount: Current Amount: 0600 Depth: Day: I Current Operation: Pulling 2-7/8" tubing. Complete rig move to Y-pad. Mix 8.8 ppg brine and circulate well. N/D tree and adapter flange. NU & test BOP. R/U to pull 2-7/8" tubing. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover June 15, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) i AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 2 ,Current Operation: Tripping. Pull 2-7/8" tubing and lay down. Mix and pump 10 bbls of Class G cement across liner top. POH with drillpipe. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-10-13) Daily Drilling Report -- PBU -- Workover June 16, 1988 at 0600 hrs AFE # 160413 (Expense) AFE Amount: AFE # 120710 AFE Amount: (Investment) Current Amount: 0600 Depth: 10,887' PBTD Day: 3 Current Operation: WOC. RIH with 8-1/2" bit and tag cement at 10,887'. R/U and RIH to lay another cement plug. 'Mix and pump Class G cement and POH 20 stands. RIH to 10,787' - no cement. WOC. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-10-13) i I Daily Drilling Report -- PBU -- Workover June 17, 1988 at 0600 hrs AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: I0,833' PBTD Day: 4 , Current Operation: RIH with 9-5/8" cutter. RIH and tag cement plug at 10,833'. Set bridge plug at 3000'. RtI-I with 9-5/8" cutter and attempt to cut 9-5/8" casing. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-I0-13) Daily Drilling Report -- PBU -- Workover June 20, 1988 at 0600 hfs AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 10,833' PBTD 7 Current Operation: Washing over 9-5/8" casing. Thaw 9-5/8" x 13-3/8" casing. Spear and pull 9-5/8" casing free. POH and lay down 9-5/8" casing. Attempt to pull 9-5/8" stub free - no movement. M/U 11-3/4" wash pipe and wash over fish from 2169' to 2176'. P/U mill and mill 9-5/8" casing to 2214'. Wash over 9-5/8" casing stub to 2223'. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover June 21, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE# 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 10,833' PBTD 8 Current Operation: Tripping. Washed over 9-5/8" casing to 2225'. RIH with back off tools and attempt to set slips. Casing appears to be split. R/D back off tools and R/U mill. Mill 9-5/8" casing from 2217' to 2251'. POH. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover June 22, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE# 160413 (Expense) AFE# 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10,833' PBTD Day: 9 Current Operation: RIH with milling assembly. POH with mill. Parted jars. RIH and latch onto fish at 2228'. POH with fish. P/U washpipe and attempt to washover 9-5/8" casing at 2251'. Not washing over. L/D washpipe and P/U back off tools. Back off tools stopped short of getting to collar inside 9-5/8" casing. POH with back off tools. P/U 8-1/2" milling assembly and RIH. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover June 23, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-I0-13) AFE # 160413 (Expense) AFE# 120710 (Investment) AFE Amount: AFE Amount: CurrcIlt Amourlt: 0600 Depth: 10,833' PBTD Day: 10 Current Operation: Tripping. Mill on junk above 9-5/8" stub. P/U 12-i/4" casing mill and RIH. Mill 9-5/8" casing from 2251' to 2253'. POH. P/U 8-1/2" casing mill and RIH to 2253'. Work mill into 9-5/8" casing. POH for new mill. P/U 8-1/2" mill and RIH to 2267'. Push .junk from 2267' to 3000'. POH with milling assembly. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-10-13) Daily Drilling Report -- PBU -- Workover June 24, 1988 at 0600 hfs AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: Current Operation: 0600 Depth: 10,833' PBTD Day: 11 RIH with back off tools. POH with 8-1/2" milling assembly. PFLI back off tools and RIH to 2260'. Tool would not set. POH and R/U to run collar log from 2900' to 2250'. Redress back off tools. RIH with back off tools to 2262'. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover June 27, 1988 at 0600 hfs Rig: Nabors 18E AFE # 160413 AFE Amount: (Expense) Well: Y-8A (32-03-I0-13) AFE # 120710 (Investment) AFE Amount: Current Amount: 0600 Depth: I0,833' PBTD Day: 14 Current Operation: POH with 8-1/2" mill. RIH with back off tools to 2263'. Would not back off. R/U 9-5/8" mill and mill 9-5/8" casing from 2250' to 2518'. P/U 8-I/2" mill and push junk to 2812'. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover June 28, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AlE tt 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10,833' PBTD Day: 15 Current Operation: RIH with 9-5/8" casing. POH with 8-1/2" milling assembly. M/U 1 i-3/4" washpipe and washover casing stub from 2518' to collar at 2526'. L/D washpipe and P/U backoff tool. RIH and back off 8' 9-5/8" casing stub at 2518'. PFO spear & jars and RIH. Engage stub at 2518' and POH with stub. Make 13-3/8" scraper run to 2500'. R/U and running 9-5/8", 47#, L-80 NSCC casing. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover June 29, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10,833' PBTD Day: 16 Current Operation: Nipple up BOPE. Ran 9-5/8" casing to 2526'. Displace 9-5/8" x 13-3/8" annulus with dry crude. Attempt to screw into 9-5/8" casing. No go. Ran and set RTTS tool on drillpipe. Screw into 9-5/8" casing at 2526'- OK. Set pin packer and N/D BOPE. Cut casing and set 9-5/8" slips and packoff. N/U BOPE. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-10-13) Daily Drilling Report -- PBU -- Workover June 30, 1988 at 0600 hfs AFE tt 160413 (Expense) AFE It 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10,833' PBTD Day: 17 Current Operation: Drilling bridge plug. NFO BOPE. Clean metal out of BOP stack. Test BOPE. Release RTrs tool and POH. RIH with bit and drill on bridge plug at 3000'. STANDARD ALASKA PRODUCTION Rig: Nabors I8E Well: Y-8A (32-03-10-13) Daily Drilling Report -- PBU -- Workover July 5, 1988 at 0600 hrs AFE tt 160413 (Expense) AFE It 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 9350' PBTD Day: 22 Current Operation: Waiting on kickoff plug cement. Clean out metal in wellbore. RIH with 9-5/8" section mill. Mill 9-5/8" casing from 9290' to 9350'. Circulate hole clean of metal. RIH with plug catcher and lay a balanced cement kickoff plug. Plug did not set up. Clean out soft cement. RIH with plug catcher to lay a second cement plug. RIH with 8-1/2" bit and WOC. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 6, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 23 Current Operation: Rill to lay cement plug. WOC. R_IH and drill soft cement from 9087' to 9208'. WOC. Drill f'u-m cement from 9208' to 9270'. Soft cement from 9270' to 9350'. POH. R/U mule shoe, 3-1/2" drillpipe and plug catcher and RIH. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 7, 1988 at 0600 hrs Rig' Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 1207 t 0 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 24 current Operation: WOC. RIH to lay cement plug #3. Pump 23 bbls preflush followed by 125 sacks Class G cement. Displace cement & bump plug. CIP @ 0730 hours. WOC. RIH & tag cement @ 9100' after 22 hours. Drill soft cement from 9100' to 9180'. WOC. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 8, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 9350' PBTD Day: 25 Current Operation: WOC. Wash and drill soft cement to 9350'. RIH and jet wash open hole section from 9290' to 9350'. P/U 3-1/2" drill pipe and plug catcher & RIH. Displace well to clean 9.4 ppg brine. Lay cement kick plug #4 with 150 sacks. Bump plug. ~L STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 11, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 9700' Day: 28 Current Operation: Drilling 8-1/2" hole. RIH with 8-1/2" BHA and tag hard cement @ 9077'. Drill hard cement to 9299' (9' below top of window). Change well over to 9.5 oil base mud. PULI motor and BHA. Motor drill to 9440'. POH & change BHA. Motor drilling @ 9700'. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 12, 1988 at 0600 hrs Rig: Nabors 18E AFE # 160413 AFE Amount: (Expense) Well: Y-8A (32-03-10-13) AFE # 120710 (Investment) AFE Amount: Current Amount: 0600 Depth: 10,225' Day: 29 Current Operation: Drilling. Drilled 8-1/2" hole with surveys to 10,225'. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 13, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10,777' Day: 30 Current Operation: Tripping. Drilling and surveying 8-1/2" hole. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 14, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE it 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,007' Day: 31 Current Operation: Tripping. Trip for BHA. Drill 8-1/2" hole to 11,007'. POH. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 15, 1988 at 0600 hfs Rig: Nabors 18E AFE it 160413 AFE Amount: (Expense) Well: Y-8A (32-03-10-13) AFE # 120710 (Investment) AFE Amount: Current Amount: 0600 Depth: 8985' Day: 32 Current Operation: WOC. L/D BHA. P/U 3-1/2" drillpipe and plug catcher and RIH. Lay balanced cement plug with Class G cement. RIH with 8-1/2" bit to 8985'. Circulate and WOC. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 18, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE# 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10,940' Day: 35 Current Operation: Tripping. Tag firm cement from kickoff plug @ 10,330'. Kickoff of plug and drill & survey to 10,656'. MWD failed. Change out MWD and drill & survey to 10,940'. MWD failed. POH to change MWD. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 19, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,150' Day: 36 Current Operation: Drilling with motor. Change out MWD tools. M/U BHA and RIH. Test MWD tolls. Drill and survey with motor to 11,150'. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-I0-13) Daily Drilling Report -- PBU -- Workover July 20, 1988 at 0600' hfs AFE# 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: Current Operation: Tripping. Motor drill & survey to 11,255'. Trip. 11,255' 37 STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 21, 1988 at 0600 hfs Rig: Nabors 18E Well' Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,255' Day: 38 Current Operation: Hole packing off. Trip for rotary BI-lA. Wash & rem to 11,200'. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-10-13) Daily Drilling Report -- PBU -- Workover July 22, 1988 at 0600 hfs AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: ~urrent Amount: 0600 Depth: 11,255' Day: 39 Current Operation: Washing and reaming. Wash and ream from 10,798'-11,138'. Packing off at 11,138'. Continue reaming to 11,187'. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 25, 1988 at 0600 hrs Rig: Nabors 18E AFE # 160413 AFE Amount: (Expense) Well: Y-8A (32-03-10-13) Al:rE # 120710 (Investment) AFE Amount: Current Amount: 0600 Depth: 11,510' Day: 42 Current Operation: Drilling. Wash & ream hole from 11,093' to 11,255'. Drill & survey 8-1/2" hole with mud motor from 11,279' to 11,482'. PFO new BHA. Motor drilling @ 11,510' with an angle of 73°. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 26, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,576' Day: 43 Current Operation: Running in hole. Drill and survey 8-1/2" hole to 11,576'. POH for BHA. RIH. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 27, 1988 at 0600 hrs Rig: Nabors 18E AFE # 160413 AFE Amount: (Expense) Well: Y-8A (32-03-10-13) AFE # 120710 (Investment) AFE Amount: Current Amount: 0600 Depth: 11,670' Day: 44 Current Operation: Tripping. Wash & ream 8-1/2" hole from 11,063' to 11,576'. Drill & survey with motor to 11,670' and an angle of 90.5°. Lost 500 psi pump pressure. POH for washout. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 28, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,670' Day: 45 Current Operation: Trip in hole with overshot. POH looking for washout. BHA parted 158' from bit. PFO fishing tools. RIH and washover top of fish. POH. Did not recover fish. RIH with new overshot to top of fish at 11,512'. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover July 29, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,670' Day: 46 Current Operation: Cleaning hole. RIH with overshot & recover fish. POH with fish. MdU BHA and wash & rem to bottom. Circulate to clean hole. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 1, 1988 at 0600 hfs Rig- Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,846' Day: 49 Current Operation: Drilling 8-1/2" hole. Directionatly drilled 8-1/2" hole to 11,846'. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU o- Workover August 2, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,870' Day: 50 Current Operation: Rig repairs. Drilled 8-1/2" hole to 11,870'. POOH. Repaired drilling line, draw works and stand pipe. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 3, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,890' Day: 51 Current Operation: Drilling 8-1/2" hole. Completed rig repairs. RIH and drilled 8-1/2" hole to 11,890'. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-SA (32-03-10-13) Daily Drilling Report -- PBU -- Workover August 4, 1988 at 0600 hrs AFE # 160413 (Expense) AFE # 120710 (Investment) 0600 Depth: 11,954' Day: 52 Current Operation: Motor drill to 11,927'. POH and change BHA. RIH and wash & ream from 11,849' to 11,927'. Drill to 11,954'. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-10-13) Daily Drilling Report -- PBU -- Workover August 5, 1988 at 0600 hfs AFE It 160413 (Expense) AFE It 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 11,954' ' Day: 53 Current Operation: WOC. RIH to lay plugback cement @ 11,650'. R/U & pump 140 sacks of cement. POH & WOC. STANDARD ALASKA PRODUCTION Daily Drilling Report -- ENDICOTT August 8, 1988 at 0600 hours Rig: Nabors 18E AFE# 160413 AFE Amount: (Expense) Well: Y-8A (32-03-10-13) AFE #120710 AFE Amount: (Investment) Current Amt. 0600 Depth: 11,~80' Day: 56 72-Hour Ftg: 334' Water Used: 525 Current Operation: Drilling. Kicked off of cement plug at 11,446'MD and drilled with 10* motor. POH and p/u. BHA. RIH and ream motor run. Drill and survey to 11,780'. · Mud Type: 0il Faze WT: 9.8+ VIS: 72 PV: 22 YP: 19 FL: - SOL: 20 Temp: 105 °F STANDARD ALASKA PRODUCTION Daily Drilling Report -- ENDICOTT August 9, 1988 at 0600 hours Rig' Nabors 18E AFE# 160413 AFE Amount' (Expense) Nell' Y-8A (32-03-10-13) AFE #120710 AFE Amount' (Investment) Current Amt. 0600 Depth: 12,408' Day: 57 24-Hour Ftg: 628' Nater Used: 0 Current Operation- Tripping in hole. Drill 8-1/2" hole to 12,408'. POH for bit. RIH. Mud Type' Oil Faze NT: 9.8 VIS- 80 PV-'20 YP- 23 FL- - SOL- 19 Temp' ll6 °F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 10, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 58 Current Operation: Running liner. Drilled 8-1/2" hole to TD at 12,575'. Wiper trip. POOH. Rigged up and ran 7" liner. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-10-13) Daily Drilling Report -- PBU -- Workover August 11, 1988 at 0600 hrs AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 59 Current Operation: POOH running string. Ran liner. Set packer. Unable to open port cellar to cement liner. Set hanger. Pulled running string. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 12, 1988 at 0600 hfs Rig: Nabors 18E AFE It 160413 AFE Amount: (Expense) Well: Y-8A (32-03-10-13) AFE It 120710 (Investment) AFE Amount: ~urrent Amount: 0600 Depth: 12,575' Day: 60 Current Operation: POOH. RIH with 4-3/4" bit and cleaned out liner to 11,407'. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 15, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 63 Current Operation: Drilling on junk in liner. P/U and Rill with RTTS and establish injection rate into 5-1/2" x 9-5/8" lap. RIH with EZ drill and squeeze 349 sacks of Class G cement down lap. RIH and tag cement at 8939'. Clean out to liner top and test lap. Broke down at 2750"psi. P/U EZ drill and Rill. Squeezed 80 sacks into liner lap. RIH and cleaned out EZ drill and tagged cement at 9027'. Test liner lap. Broke down at 2750' psi. M/U 2-7/8" drillstring and RIH to clean out junk in 5-1/2" liner. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 16, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE# 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 64 Current Operation: Tripping. Drill on junk inside 5-1/2" liner to 9270'. MAJ 5-1/2" RTTS & RIH to 9080' and set. Test 9-5/8" x 5-1/2" lap and held 2450 psi for 20 minutes. Test inside of 5-1/2" liner and pumped 2.5 bpm @ 1000 psi. RIH with 4-3/4" bit and clean out to 9590'. POH. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 17, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 65 Current Operation: Drilling cement. Cleaned out liner with milling assembly. Drilled cement from 10,692'-11,075'. STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: Y-8A (32-03-10-13) Daily Drilling Report -- PBU -- Workover August 18, 1988 at 0600 hrs AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 66 Current Operation: Milling on landing collar. Drill cement to 11,142' & wash to 11,475'. Mill on landing collar. POH & clean junk baskets and change mill. RIH & milling on landing collar. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 19, 1988 at 0600 hfs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 67 Current Operation: POOH. Milled on landing collar. POOH. Tested 9-5/8" casing and liner to 500 psi. RIH and milled with globe basket. Reverse circulated POOH. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 22, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 70 Current Operation: POOH with fishing tools. Drilled out landing collar and washed to 11,515'. RIH with 3-3/4" mill & 2-1/16" tubing. Milled junk at 11,523'. POOH, backed off at bottom of 3-1/4" DC's, top of fish @ 10,440'. Fished for 2-1/16" tubing. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 23, 1988 at 0600 hfs Rig: Nabors 18E AFE # 160413 AFE Amount: (Expense) Well: Y-8A (32-03-10-13) AFE # 120710 (Investment) AFE Amount: Current Amount: 0600 Depth: Day: 71 Current Operation: RIH with fishing tools. POOH - No fish recovered. PU overshot. RIH & wash over fish. POOH - No fish recovered. RIH with rolling dog & 31' extension and wash over fish. POOH - No fish recovered. RIH with fishing tool. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 24, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 10,722' Day: 72 Current Operation: Fishing. RIH with fishing assembly & recovered 312' of 2-1/16" tubing. RIH with fishing assembly & recovered 13 its 2-1/16" tubing. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 25, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 73 Current Operation: RIH with globe basket. RIH with fishing assembly, recovered 5 joints 2-1/16" tubing. RIH with fishing assembly & recovered remainder of fish. PU globe basket & RIH. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 26, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 74 Current Operation: Circulate & condition mud. RIH with globe basket. Reverse circulate & drillpipe plugged off. POH. RIH to 11,410' & circulating. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 29, 1988 at 0600 hrs Rig: Nabors 18E AFE # 160413 AFE Amount: (Expense) Well: Y-8A (32-03-10-13) AFE # 120710 (Investment) AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 77 Current Operation: RIH with 3-3/4" mill. Continued fishing with globe basket until no junk recovered. P/U 13 its, 2-7/8" DSS tubing & 3-3/4" mill and RIH. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 30, 1988 at 0600 hrs Rig: Nabors 18E Well- Y-8A (32-03-10-13) AFE tt 160413 (Expense) AFE It 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: 12,575' Day: 78 Cdrrent Operation: RIH thru 4-1/2" slotted liner. Rill to 4-1/2" x 5-1/2" x-over @ 11,515' with 3-3/4" mill & attempt to go thru. No go. POH & P/U 3-7/16" mill. Work thru x-over @ 11,515'. POH for 3-3/4" mill & 2-7/8" pipe. RIH & work thru x-over. Working thru slotted liner. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover August 31, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 79 Current Operation: Cleaning pits. RIH through 4-1/2" slotted liner & displace with 9.0 ppg oil mud. RIH with polishing mill & polish PBR. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover September 'I, 1988 at 0600 hrs Rig: Na-bors 18E Well: Y-SA (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 80 Current Operation: Running tubing. Displaced well to brine, rigged up to run 4-1/2" tubing. STANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover September 2, 1988 at 0600 hrs Rig: Nabors 18E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Invesunent) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 81 Current Operation: Slickline work. Ran robing. Installed & tested x-mas tree. Rigged up Camco. Attempted to set plug in ~N' nipple. ST.ANDARD ALASKA PRODUCTION Daily Drilling Report -- PBU -- Workover September 6, 1988 at 0600 hrs Rig: Nabors 18-E Well: Y-8A (32-03-10-13) AFE # 160413 (Expense) AFE # 120710 (Investment) AFE Amount: AFE Amount: Current Amount: 0600 Depth: Day: 82 Current Operation: Rig released. Set plug in 'X' nipple. Set & tested packer. Displaced annulus & tubing to brine. Tested sliding sleeve. Rigged down. Rig released @ 1700 hours on 9/2/88. DR~T I~ DI~CTION~ DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY STANDARD ALASKA PRODUCTION COMPANY mmm mmm COMPANY Y-08 A RE-DRILL WELL NAME PRUDHOE BAY LOCATION AL888-D26 SINGLE SHOT & MWD SURVEYS 8/22/88 mmm ~ JOB NUMBER TYPE SURVEY DATE LYNN HENSLEY DIRECTIONAL .-n /""% . . .... NAME TITLE SIGNATURE DEPTH INTERVAL 308 FT 12575 FT FROM TO 8-04-88 8-09-88 mm DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR W~r.r. WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTENREQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. C4RFAT L. AND D I RE-_-(_': T I ONAL DR :[ L. L .I NG, ! NC: Client .............. : STANDARD ALASKA PRODUCTION CO. We]] ................ : Y-OB RE-DR.II..L. Ver-ticai SeetJor, (it.: S 2:l.215 E Mcgnet~c Dec]~n¢ition: 30 deg 48 ,',Jrt E Ddto file F~c!rne ...... : B:PYOBC.DAT RECORD OF S~JRVEY Computc.tt.~or~- RADIUS OF CURVATURE Survey date- 8/:16/88 Method - GYRO/MWD/S~NGL.E SHOT RKB Height.- 87.1 ft MEAS DRIFT TRUVERT SUBSEA SECT]ON DIRECT]ON RELATIVE COF~RDINATE.--.S C:L.OSURE DOG LEG EPTH DG MN DEPTH DEPTH DIST ANGLE FROM WF-LL--HEAD D.ISTANC. E Dr3 MN S 0 0 0 0. O0 -87.22 O. O0 N 0. O0 E:- 0. O0 N 0. O0 E O. O0 N 0 0 0 E 0. 000 30R 0 7 308. O0 220 88 0 24 "* 28 :].? W 0 ~':~ "' t: ...... c.~ . . c.'b o 0 ....... 1 ,., W f) ...... 3:1. 28 608 0 7 60a. O0 SaO.88 0.88 S 42.60 W 0.77 S 0.50 W 0.92 S 32 56 53 W 0.000 908 0 ~. 90B.O0 820.88 0.9~ S 84.59 E :1..0~ S 0.40 W 2.:!.2 S 22 6 58 W 0.033 :la0c,,.., n_ 5 .~,..-,".~no_~, .... O0 :!:!.20.88 :I ~.2 S 2e.- ..... O0 E 3. 3.7 ~ 0 3.~: W -1 .... ~; ,~,- 9. :1.0 2n_ W O. 022 :t[508 0 7 ......... -tR08.00 1420.88 2 ,.~,ca ..... S 46 60 E ~. 59 S 0:15~. E :l..B9 S_ 4 4:1. ~_~. ' ~ :13 rzq ;1.608 O 35 :L608 O0 -~qc~n 88 2 J. 2 c: 30 89 E: ~ fl8 R f) 52 E~ 2 .].,_ S · ~-'o ......... -~ 0 E 2 733 1708 3 :I9 :1707.93 :1..~:0 a:l 5.28 S 35 30 E 4 91 S 2_37 E S.45 q 25 ~5 1F'08 6 52 :1807 52 :!.720 40 :1.3 08 S 4?4 80 E J..i 75 ~' . ~ ................ = 8 ...... 0~. E 714 22 S 34 :!8 1908 7 46 71.908.70 :1.8:L9.S8 23.86 o ... 26 S . ,~ 43.:].0 E 20 99 S ].6.77 E .87 38 37 26 E 0 900 2008 8 2:!. 200E5.72 :19:!.8.,:50 2:!.08 :l.:l,.° ......... ,:.,.I. 04 2R ~..'~0:1.7 . :t. 6 2208 :I.S 35 220:!. 57 2:1.].4.45 ~ 0 224 3S '~.l.,.:~. '~ 2Y!a8 ' E, 7 22 ' 3:1.[57 S 25.97 E 40.88 S 39 26:1.2 E 0.590 4[5.08. ~:3 36. O0 [!! 57.69 S 38 36 29 E 2.68.9 64.3:1. S 48.63 E 80.63 S 37 5 42 E .. ,~ ................. ~ 36 :I.S .l.::, E 6 :I. 92.42 S 64.99 E :I.:12.:1.7 S 3[5 24 36 E 4.570 2408 25 44 cr:'a=q :1,7 ~=9,0:1. 05 2508 27 Sa 2477.43 2390. 2608 27 0 2566. :1.8 2479.06 c:t ~8 27 2654 ....... 2567 83 c808 2742 [57 :1.25,78 S 84.7:1 E :15:t.64 S 33 [57 30 E 4.786 :165.42 ,...q :106 . :1.8. F :1.96 .56 S ,.,::,m~.. 4:!. 45 E ,._'= . :!.'73 206.67 S :126.70 E 242.42 S 3:! 30 3¢.';. E 0.970 :-'~48 22 S :t46. [5 :I E 288. ,-.~o .'.:l _ . ' Fi . ,~.o _. 3a 33 4 E 0 8:1_,_ 29:!..72 S :1.67.26 E 336.27 S 29 49 39 F~, 2.00:1 3008 34 4~': 2o'1:1 36 2824 ~'~ 3208 36 26 2992.68 2905. 3308 39 34 3:1.~,0. :!7 30~53. OE5 RECORD OF .L~URVEY M. EAS DRIFT TRUVERT SUBSEA S[~CT .'t' ON DifRECT 3'ON RELAT ]VF COORD.I NA-[ES CL. OSURE DEPTH DG MN DEPTH DEPTH DIST ANGLE FROM W~LL,-HE_AD DISTANCE DO MN S 34r)8 4i 2[5 3226 22 .q:l.:qc9:1.0 66~} 30 o_ .67 ............. - ,,~ 2:1. E 6:1.6.:1.4 S F~07.55 E 68a ~:-;9, :--i ':," .................. o. 3:1. 36 3S08 5-3 :[6 3300_!.'..:!. 32:1.3.02 730.8:1. S ~.i. O0 E 6.78.87 S 332.07 [-- 7St:,.73 S 26. 3 5V, 3808 43 9 3373.02 3285.90 797.70 S 24.39 E 742.02 S 358.48 E 824.08 S 25 -57 8 .3708 !iQ 7 3~46.[.:,? 3359.47 882.P0 S 2.9.39 E 802.4:1. S 389.:1.0 E 89:1..78 S 25 52:1.0 3808 4:3 2:1. 3520.04 3433.92 926.9:1. S 3:1.89 E 860.79 S 423.68 E 959.4:1. S 26 1_2 23 DOG LEG deg/:1.00 :1.. 863 ;i. 878 :1.. 590 ~ 475 I .706 3908 43 3-q 3592.62 3S05. E.O 99'1. i27 S 32.60 E 9:].8.96 S 4008 43 24 366. S.:18 3578.06 2055.24 S 32.50 E 976.97 S 4:10 a 43 27 ~7 ~, 7.8:1. 38S 0. ~9 :1. :119.22 S ~°. 89 E :1. 03~. 82 S ~208 43 27 38:[0.4:1 3723 29 :1.:1.83 23 S 3,, SO E .I0. ~ 89 S 4308 43 28 3882.99 3795.87 1247.27 S 32.80 E :1.:1S0.~1 S ~,80.38 E 497.~0 E 534.54 E ,..gq, :1.. 68 E 6.08.77 E :1.027.83 S 28 36 3S E :1.096.30 S 26 S8 Si.--., E :1. !.. 6.. 4.72 ,_,° ,..'~, :1. ?7 E :1.233.2:1. S 27 37 S 130:1..74 S 27 53 :!. E 0.401. O. :1.73 O_ :1.9,'I. O. :I. 8~ O. :1.43 4.!~08 !~3 20 ~028.:1.9 39~J..07 :1.375.37 S 32.60 E i288.~8 S 4608 43 9 4:1.01.04 40:!~.92 1439.23 S 32.39 E I324.26 S ~t708 82 ~t-9 ~., ,~ 4 gn~ t.t7*..19 087.07 :1 .... ,,~_.82 S 32.39 E :1.381.84 S .... -,'-r 27 . . 4808 43 ~ 4247 3~ ~.1. o~. :1.5~6.3~ S 32 ~0 E :1.439 3~ S 6'~+5.92 E 682.90 E 7:1.9.70 E 756.22 E 792.78 E :1.370.33 S 28 7 2:1. E I1,,,38.86 ."::; 28 20 2 E :1. r: fl .... ,.,_,'.20 o_ 28 3!. 22 E :1.575.23 S 28 -',,.:1. 2.4 tF J. 6~+3.22 S 28 SO ~+[5 E O. :I~6 O. :!.73 0.208 0.333 490,q 43 20 ~,o.-.:~0 27 4233:1.5 :1.630 22 c: 32:19 E 1497:1.8 c, 5008 43:1. 8 4. 393.03 430 5.9:1. :1. 89~+. 40 S 3:1.. 89 E :1. S 5 [5 .. 39 S 5:1.08 43 qq ~6~5 44 i+'~a 32 2759 09 1~ 3~. 3° E :16:1.4. :I8 S R208 ...... it4 47 z~i336.~q~ ....1+2}49 83 "Roi,.66~.c..~... S 3~..69 E 1673.7S S 5308 ~4 50 4807 89 4520 77 :1890 80 <' '3.. ....... ~ 3:1., 19 E :173,_ 88 S 829.4 :I. E' 865.70 E 90:1.78 E 938. Si+ E 975.10 E :17I:1..57 S 28 59 8 E :1.780.08 S 29 5 58 E :1.848.97 S 29:1,:1. 25 E :19:1.8.84 S 29:1.6 3~ E :1.989.26 S 29 21 9 E O. 290 0. 238 0.633 0. 879 O. 254 5408 ~5 0 #678.7I 459:I,.57 :1.957.0.9 S 3:1.60 [_-- 1794.I5 S ~.0:1. I.89 E 5508 ~[5 ~2 2+7~8.98 ~+66:1..86 202~+.0i~ S 30.39 E !855.13 S ~0~8.52 E 5608 47 3 i+871,7.97 !~730.85 2092.71 S 29.00 E :1.9:1.8.0:1. S 108~.38 E 5708 48 {'~_-,,.,,.,~-=F¢':~,. 50 --,~'~cm, ~,., ....... 38 2:1.63 0[5 S 2R ..... 50 E J, 9°'~,~,~ . 68 c'~"' :1:1. :1.9 .85 E 5808 49 15 495:!. 60 4864.~8 2234.90 S 27.50 E 2048.93 S :1,:1.515.08 E 2059.83 S 29 25 21 E 2:1.30.94 S 29 28 30 E 2203.33 S 29 28 56 E 2277.08 S 29 27 3:1. E ..... a ... 44 E O. 264 0.935 :1.. O. 989 :1.. 375 [5¢208 48 47 S0:1.7.:1.8 ~930.06 2307.44 S 27.7!.9 E 2:1;15.98 S :1.:1.89.78 E 6008 47 46 RaS:q ........... 74 4996 62 ~_,.,,'u'u"z~, ..... 2:q S 27 O0 E ~_'~"q*~.,.,.,, ............... 4:4 a ~' 1223.75 E ¢:;i08 46 38 525:1..68 5061+.56 24!t9.73 S 27.69 E 2247.60 S ~.257.I+[5 E 6Pf)~ 46 25 q~c~f) 48 q'133 ~ 25 -' :1.29:1. 73 E ,~ :1.9:115 ~ ~8 89 E 23:1.1 r-~-- ~- 0.4.99 'J.. 022 I. 71.9:I. 0 q':;,P . :... M. _..~ 0.2:!.:! Y- 08 RE.-.DR] L.I... 8122188 RECORD OF SURVEY MEAS DRJFT TRUVERT SUBSEA SEC:TJON DIRECTi'ON REL.ATIVE COORDINATES CLOSURE DOG LEG DEPTH DE; MN DEPTH DEPTH D]ST ANGLE FROM WFLL-HEAD DISTANCE DG MN S deg/lO0 ;.c.,:! ,., '7:]. S E 2437 9:1. S i 67 E 2792 zti 29 1:I. 6608 ~+5 SO 54.28 -q:1. S34.:1. ;_-2.9 ;?_72~ 96 cz 29 ~0 E ;-~nO 4,7 S 1396 ~c~ E 28o.'7~t 2r:- ~ 2~ 1:1. ROE r~ 192 ,'::,6f)8_~+~ E, 8 S~}'.:28. O0 ~} :1.0 . ,_qP,_, ~_:~"'~93, .12 S 29 .69 E ,_:.,,.,~":r:":'~ .... .9:1. S :1.~432 . ~S. E ~....,-~oA:.,,.. ..... 06 S 29:1.2 .q E 0 :1.6.,2.';, 6708 4.5:1.7 S567 ~' . . _ . 262~+ 9z~ S :1.~67 96 E 3007.553 S 29 12 56 E 69:1. ..... 3 5480 8:1. 2860 89 S 29 89 E .... O. ............... · -.~c~-_~- . q _ 69 . _ . 6808 its ~2 .5¢:,:q8.0~, [55[50 92 ,-..-~..8 [;,3.... 29. E 2686 8~ S I50.3 39 E 3078.8z~ S 29 13 ~.~.} E 0.~29 6908 -'+~+ S8 S708.33 [5262:!. 2:1. 2996.8,5 S 30.30 E 274.8.~-3. S :1.638.9S E 7008 h~-+ 3~ 5779.33 5692.21 3062. ~+6 S 30. :1.0 E 2809.29 S :1.57~. 37 E 7108 ~+ z+3 58S0.4.8 5763.36 3:1.28.86 S 30.60 E 2869.93 S J. 609.88 E 7208 4.4. 22 5921.76 5834.64 319~.9~ S 31.:1.0 E 2930.:1. S S :1.645.8~ E 7308 ~+3 54 S993.53 [5906.~+:1. 3260.~+5 S 31.00 E 2989.80 S :1.68:t.76 E 314,9.96 S 2.9 :l.Z~ h6 E 3220.37 S 29 J. 6 :1. F_ 3290.62 S 29 1.7 24. E 37I¢:,0.7]., S 29 19 2:1 E 3~,30..3-~, S 29 21 28 E 0.79z~ 0 .;412 0. 289 O. 427' 0. 7~,08 h3 .37 606~.75 5978.63 332.5.F,2 S 3!. 10 E 30~49.06 S :17:1.7.43 E 7508 ,-'~3 [:,8 6:1.37..9~+ 6050.82 3390.66 S 3:t. 39 E :3:1.08.22 S :1.763.33 E 7¢508 ~-4 ~9 6209.5.0 6122.38 :3z~S6.22. S 3:1.. O0 E 3167.97 S :1.789. BLt E 7708 ~.~+ 58 6280. ~+5 6J. 93.3:.'3 :35;:~2.5.1. S :31. :1.9 E 3228.32 S :1.825.9:1 E 7808 ~+L:,. 32 63150.85 6263.73 3689.33 S 30.89 E 3289. :17 S :1.862.52 E :3668.6-~+ S 29 25 37 E 3638..'-~6 S 29 27 ~0 E q* . S 7_-29 ' ~:.708 91 29 :':.'171. E 74779.90 S 29 ;.31. 16 E 0.287 0.377 0.7:1.0 0.331 0.587 7908 -~,6 6 64.20.5~+ 6333.4.2 36S6.76 S 31.39 E 33S0. SS S 1899.61 E 8008 ~}(;-7, ;;2 6~89.92 6,~+02.80 372z~.]+8 S 30.89 E- 34.:1.2.19 S :1.936.85 E 8:].08 ~E, 88 65. V,9.39 6~72.27 3792.27 S 30.69 E 3~73.98 S :!973.67 E 8208 --'-~6 20 6628.67 6S~,~:1..F.,.$ 3860.30 S 30.60 E 3.r5.36.03 S 20:I. 0.z~3 E 8308 ~t,_':4. 28 6697.6:3 66:1.0. ['-.,:1. 3928.67 S 30.39 E 3F.,.98.~2 S 20z~?. 18 E :q¢,?-a .57 S ;_?o 3~.~ F.,O E 399S.~9 S 29 36 8 E h067.S9 S 29 .7!7:1. h E 4.1-~0.00 S ;:-?_9 ;38:1,0 E O. 623 0. 267 O. :].23 O. 173 84-08 4-6 12 67¢56.68 6679.66 3996.92 S 30.80 E 3660.69 S 2084.. O0 E , - . ,'o-~:' . ..... 2:1.20 87 E 8 E, 08 -+ ~:~ 2 ? ~:~,~ 3,.~. 7:467 ~ 8.6:1. ~ 065:1. ~+ S 30 8608 ¢+6 ~S 6904.¢+~ 6817.32 ~,133_78 S 30.30 E 3785.58 S 2:1.57.6~ E ...........- ,.,,.,¢.,..,..,,. 73 .............. ~+202 57 ,.~ 3:!. CiO E38~8 3:q S 219~+. Hr:"'~E 8808 -~+7 12 70~0.98 6953.86 4.27:1..58 S 30.50 E 39:I.I.2-~ S 2232.2S E 0. 342 0. 296 0.3:1.8 0.4.09 0 :-:9! 8908 4,7 2~.+ 7:1.08.79 702:1.. 67 -53z+0.8:1. S 3:1,, :1.9 E 397.~4.34 S 2269.93 E 9008 ~7 4-3 7176.278 7089.:1.6 .I!,~t:1.0.29 S 30.69 E ~037.63 S 2307.87 E 9:!.08 4.7 #z~ 725o., ,.,. S5 7:1.56.4.3 4.480.0~+ S ~0.80~., E ~:1.01 .23 S 23~+~5.6Y'- E 9208 ,~+7 28 7310.98 7223.86 ~5~9.68 S 30.60 E ~+:1.6!+.72 S 2383.4.0 E 9R08 ......................... ;48 6 7378 I7 729J. OS ~619 66 ~' 30 Iff E 4.228 63 o ¢''' 2~2fl ...... 82 F .*+576.89 S 29 -~+3 S8 E ~650.67 S 29 4-5 7 E !+72q..65 S 29 ~+6 3 E ~-...4, P ?":~c'.. ~..21+ ,..q 2~. '~-7 ~_'-:~r:,., E 0.419 0. 063 O. 288 0.69'.1. Y-08 RE-- DR] LL. MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEP-rH D!ST ~g:l..'.'.-'l ...... 32 14 7334 33 7447.2:1. 4748. :16 S :1.7. O0 E 4349.~..u~ S 24_ 73.37 9607 31 24 76:1.~.20 7327.08 4797.47 S 16.93 E 4396.60 S 2~87.83 °~ou.,._~ 'u0~. ....... ~0 759~ S3 7608 ~:]. ~846 38 ~,° 1S.33 [~ 4~3.76 S cSt.:]..~6 973~ 3:]. 0 7722.98 763~.88 4882.78 S 13 ....... 40 E ~4q~ 51 S ,_=:OB.~= 82 RECORD OF SURVEY IRe dr:t1] from 9R'l:n FID) DIRECTION REL AT'[VE COORDINATES C:LOSURE ANGI. E FROM WELt._-HEAD DISTANCE [)(3 MN S 5003.30 S 29:37 36 E GOS:1..67 S 29 30:1.27 E G099.44 S 29 22:33 E 51:1. t:,.39 S 29 ].9 S3 E S:!.:30.78 S 29:1.7 :IS E 9797 31 0 7777.:!.0 7689.98 489¢,.98 S 14.87 E 4490.79 S 2S14.1:1, IL-- °Ro°::,,_,., 30 S5 ?'803.68 7716.36 4910.90. S 13.~2 E 4506.2S S 2S18.01 EE 98S9 3:1. 3 7830.26 ??~3.:1.~ 4986.83 S 13.~1 E 4521.Y7 S 8521.7~ E 98~8 30 37 7863.73 7776.63 4946.83 S :!.2.30 E ~341.25 S 2326.22 E 9929 30 33 7890.~,3 7803.3I 4962.60 S 14.10 E 4336.6:1 S 2329.82 E 9961 3'.1.3 79:1.7.91 7830.79 4.978.98 S :l. 2.SO E 4S72.,9.6 S 2533.59 E 9993 :4:1.16 7945. :30 7858.18 ~99E,.53 S 12.60 E 4588.72 S 253"7. :t. 9 E 10025 30 ~0 7972.73 7883.6:1. ~011..98 S 1S.00 E 4,604.71 S 2S~:1..12 E 10056 30 26 7999.43 7912.3I S027.71 S !3.60 E 4619.98 S 2545.0:1 E 10087 30 26 8026.!6 7939.04 5043.41 S 11.50 E 4633.31 S 2548.42 E '10151. .... 9,0 51 808:1. ~..,'~'*a ........ 7994.10 5076 02 .q :!.3 20 E 4667 17 S ¢:,:5,..'*~'-R.40 E 0213 30 :!.r~ 8134 64 a0.47 ~-~ o~ 06 E . ............. 10307 :~0 0 8215. ~ 9~., 8128.88 S154.53 R :l.l O0 E 4743.¢~f~ S ~_=.,~.,.68 E 10340 ~0 12 ~, ........ ,u.~. ~* ~,=.77 OS E 8~:.4 S3 8157 41 $17'I 09 S 12 60 E ~7~. 80 o c~q -'. ........ '~o- - 5 .73 . ' .... 10372 :42 30 e.c/.l..8 8184 5187 74 S 12 90 E 4776 03 S 23/40 72 E I0403 .q5 18 a:~o"; 58 q ''-~lt) 46 q u~R 02 S 12 80 E 4792 89 S 2584 S6 E I04~7 37 36 8324,93 8237.81 S225.21 S 12.10 E 4812.61 S 2588.92 E 10494 ':¥~ 42 ~.:o 44 Rnq'~ ~p [5260 81 S 10 ~0 E 4847 52 S .o=gc 8~ E I0523 39 48 8393.28 8306.16 $280.62 S 9.10 E 4867.05 S 2~99_27 E 10557 39 4.8 8~:].7.86 8330.74 5301.08 S 7.30 E 4887.32 S 2602.19 E 10620 40 4-8 8~65.91 8378.79 5341.74 S 7.90 E 4927.7:t. S 2607.58 E J06S1 ~t.O 42 a~ ~' :q9 8402.27 c~4:l. 93 S - . ~...~L:- ...... ,,.., .... 10682 ~,1 6 8E, 12.82 8425.70 5;382.16 S 7.50 E 4967.9,4 S 26:1,2.5S E 10713 ~,~ :1 18 ¢~c:'4,~ :1t5 8449.03 5402 ~,,,,_~, ...... (, F 988 21 ,. 261 .0 E 10745 42 0 8360.06 8472.94 S423.75 S 8.80 E 5009.29 S 2617.80 E 557[5.1 I. S 27 53 11 E 5594.04 S 27 48 46 g 56:1.3.0:1_ S 27 4~ 21 E ~0c!c:.09 39 SS E DOG LEG deg/:lO0 7.9~0 0.8.87 0. 743 0. 524 1.435 1. 264 0. 460 1.412 I .507 1. 974 0. 682 ~ 706 1. 382 1. 738 0.95;5 1. 324 1. 079 1. 368 7. 193-. 9.033 6.808 3.858 1.878 3.303 1. 639 2. 083 2. 004 i 4. 126 Y-08 RE-.DRILL RECORD OF SURV[:Y MEAS DRIFT TRUVERT SUBSEA SECTION DIRECTION RELATIVE COORDINATES CLOSURE DOG L. EG DEPTH DR MN DEPTH DEPTH L I,.T ANGLE FROM WEL.L.-HEAD DIS'FANaE DG MN S deg/:to0 ..... ,_e,,_O 85 E 5672.36 510777 42 30 8583.75 8~98.63 51+4R.23 q 7.~50 E 5030.59 S '='= ........ :10808 ~2 30 8606.60 8S519.48 8466.:t5 S :tO.:tO E SOS~,.28 S 2624.08 E 5692.e0 S 27 27 ~ E 3.828 ....... 8~.30 8487.:t2 S 8.50 E _07:t mm ~.S E 57:1.2 .~.087:t ~2 30.. ,.,~zc'~o,.,~: ....... 9R 8B6B 86 S,..OBR .73 q,. 6'.B0 E [5093.~6 S 2630.27 E [:5732.B:t S 27 ~.8. ~3 E 2.920 510925 42 B~ o,qe9 66 8605.5~ ,~=,~ . 26 ? 60 E s:tag.8:t S 263]~ 77 E t5746.88 27 1:1 9 E .1. 200 :109~+:]. 43:12 870!+. 3[5 8617.P3 BBS6. :].S S 6.30 IF_: 5.1.40.6S S 2636.09 E :t:l, OOS i~7 0 87i~9.6~.~ 8662.[52 [--,60:I..20 S 6.~0 E 5.1.85.[56 S 26~+:t.2d E :tlO':~,': 49 ].2 8770:3~+ a,.,48.~ ,.,._ S6::¢4 '!9 S 6 30 E 5208 49 S 2643 78 E I067 SO 42 8790.29 8703. :1.7 t:,,6,~7.79 S i+.20 E B2,'32. :1.2 S ,-'2_6~5.915 E zt. 24-4 · 5. 086 6. 974, 7. 099 6. .1,!097 S2 ,~+8 88!0..1.0 8722.98 S672.69 S 3. :tO E 52E, 7.20 S 264-7. [5[-5 E "1130 B4- 36 a~-~ 45 87~+1. :qrq [5697 ~t4 ~ u BO E ~5282 :l.~+,, ~ 26~+8.99 E //:].6~ 56 .1.8 88~7.7~ 8760.61 B72~_:t7 S 3.00 E B310..1.0 S 26~0.B7 E 2:I:1.9;3 S7 42 8863.83 8776.41 8749..1.~ S :t.70 E 8334.z~0 S 26S:t.87 E 6.9:tS 5. 869 m :t 07.t c 793 :t .1,. ,", o I :12~q 63 0 8894.2:1. 8807.0r: E, 803. [58 :q ~+. 20 E 5389.33 ,= 2654. I,.. E :1.288 6~+ .48 b~ O~ 28 882.1.. :t6 ,:,,_~:,~ ..... i:t320 66:36 892:t.,45 8834.33 586.1.. .1.4 S 5.90 E [54~7.00 S 2689.33 E 1135:t 68 36 8933 ...... 27¢q 8846 :].4 ,..,_,.,¢qR°c~ 70 c:,¢'7 .00_ E S~7~,~ ~: .47 o ¢* 2662 . ~.r:q,,.. E 11qao, "/0 :t2 aolu, r-~ 8857 !{O [;9'19 RD q 8 :tO F RROB :t7 S 2666 ~8 E 6.9z~O 6. :I. 80 5. . 9:1.9 S.8~3 :tlh:t~.+ 72 :t. 8 895]+.~,~9 8867.37 [5948.9.1. S 8.80 E [5534.20 S 2670.80 E :l :l.l~-l~& 74 2~. 8963.65 8876. [53 B979. [~';~ S 8.80 E B564. [50 S 2675. ~9 E :t:1../+72 7S ~8 8970.3~ 8883_22 6004.6B S :I. 1..1.0 E 5S89.2~, S 2679.83 E 11508 77 18 8978.7.1. 889!. B9 6039.66 S 12.80 E 5623. ~+9 S 2687.08 E :t:!.~542 79 30 898~.55 8898.43 6072.93 S Z~.70 E s6as.a~ s 269~.99 E 7. 077 6. 563 9.905 6..1.28 J.:!.57!{- 8:1, 48 8990.7[5 8903.63 6:1.04.4B S :!.~+. 70 E 5686. ~i8 S 2'703. O0 E .1.1606 8]+ 0 899~+.'70 ~3907.58 6236. :!5 S :].l+.~O E 87.1.7.:t2 S 27:t0.98 E :I.:1656 87 30 8998.~t2 89:t:t.29 6:t8[5.88 S :t6.:tO E 5765.2:t S 272~+.09 E :1i718 87 :t8 9003..22 89:1.~t..1.0 62~+7.59 S .1,6.10 E 582~.72 S 27~:1..27 E X!788 87 30 9004.39 8917.27 63.1.7.27 S :tS.:].O E 589:1.90 S a7SO.¢~¢~ E 6296. :].2 S 2[5 2[-5 26 E c-,'~F-, 22 :!I E 6327.3I ,_*, ..... 6376.37 S 25:1.7 28 E 6~+37.[5~- S 2Fi :i2 .1.:I E 6B06.60 S 215 6 20 E 7. :].88 6. 937 7.779 0. 286 RE-DRILL REC:ORD OF SUI:~VEY MEAS DRIFT TRUVERT SUP, SEA SECT.'[ON DIREC'f']'ON RELAT]'VE'_ COORDINATES f-:LOSURE DOG LEG DEP'f'!.-I DG MN DEPTH DEP'fH DIST ANC-;[,E FROM WEI...t.-..I-4EAD D.'fS-fANC[: DG MN ::9 deg/:tO0 :t. 846 87 2'`+ 900,.'5.98 89:1.9.8.'.6 6,-3_74.99 S :t6.5,0 E ~5947. S2 S 2776.92 E :1;1.906 87 .30 9009.64 8922.S2 6434.6~ S :IT.GO E 6004.84 S 2794.4S E{ 51970 87 1.8 90:12.. SF, 892[5.4:.'~ 6498.22 S 71.6.80 E 6065.93 S 2'83.3. :_'~0 E .~.2067 87 0 90:1.7.37 8930.2~5 659~.6:1. S 17.20 E 6:158.58 S 284:1..63 E :12.:1.3:1.86 42 9020.89 8933.77 6658.38 S :12.20 E 62920.37 S 2-3_857.84 IY. -.~ --=, .-, o,:;, ,q6 2,.'+ 90....,¢..~.60 89S9 48 ¢.::,758 OS S :16 SO E 63:1.2 2.2 S 288:1 33 E 12258 86 '`+8 9028.E50 t394:!.. 38 6784.86 .~ :1.6. BO E 6342.84 S 2890. :!.2320 87 24 903:!.. 6.4 ,8944. S2 68~6. SO S :t6.80 E f..'-;402. :1.7 S 2908. :.1.2386 87 24 .t;;'03~.63 89.",,-7. ~5:1.6912. :1.0 S :17.20 E 646S.22 S 2927.43 E 3.2478 ,87 0 9039.:1.3 89152.0:I. 700L3..S0 S :1.7.20 E 65F.-;3.00 S 29t-',~.50 E 0.7:1.0 :1. 672 :1._ 0. 7.80:1. 6938.74 S 24 32 7 E 6970.37 S 24 29 S5 E 703:1.72 S 24 25. 47 E 7097.:[0 S 24 2~. 39 E 7:!.88.29 S 24 i6 :[0 E 4. 520 :1.. 250 :I.. 082. 0.605 O. 436 :1.2~67(5 86 42 9044.46 8967.34 7099.7"+ S :18.20 E 664t5.27 S 2984.04 E 72..84. S:1. S 2'`+ :I. 0 S7 E :1,_ 0'7,.3 Y-08 RE-DRZI LI_ DATA INTERPOLATED FOR EVEN :!00 FEET OF SUBSEA DEPTH MEAS. DEPTH 87 :I,'37 38?' TRU VERT SUB SEA MD-TV[) VERTICAL. DEPTH L-,'E P T H D.I FF. CORRECT 87 0 0 0 :187 :1` 00 0 0 287 200 0 0 387 300 0 0 487 400 0 0 587 [587 500 0 0 887 687 800 0 0 '787 787 700 0 0 887 887 800 0 0 987 987 900 0 0 I087 ;t. 287 !387 1587 ;i687 2788 1888 ;1989 209:1. 2298 2407 25 :I. 9 2632 2860 2979 3:1.02 :!,087 I000 0 0 !187 1~.00 0 0 1287 J. 200 0 0 1387 1300 0 0 I~87 1400 0 0 :1. 587 :I 500 0 0 34 a-~, :1600 0 0 :I, 787 3.700 I :1` aS? :I. 800 0 1987 ~. 90 a c~ ~. 2087 2000 c:100 27'87 2200 2;3.87 2300 2687 2600 58 13 2?.87 2700 73 :1.5 2887 28 0 0 92 ! 9 2987 2900 2 :I.~ 22 RELAT I'VE COORDINATES FROM WEL. L-HEAD 0.80 S 0.36 W 0.90 S 0.56 W :1..02 S 0.52 W !.05 S 0.42 W 1.03 S 0.37 W :1`. 0;1 S 0.29 0.96 S 0. :t.? ..I..28 S O.:lB :1`.4:1 S 0.03 1.56 S 0.I0 1_84 S 0.48 E 4.00 S :I..75 E :t. 0.02 S 6.46 E ;1.9.00 S ].5.04 E 29.0:1. S 24.74 E 2 :l. 6. ":' ,., ,' S 3. :'3:1.. 3 :I. E 3!5.60 S I78.6~ Ei 373.73 S 205.'.';8 E 438. :37 S ~?_31~-. I~S E L Y-08 RE-DRILL DATA .TNTEI:U:'OLATED FOR EVEN :1.00 FEET OF SUBSIEA DEPTH MEA:R TRtI VERT '"-"l I'-'" .... o_ ,:_, SEA MD-'FVD VERTICAL. L')E P T H DE!:::'T H DEPTH D I FI::. COI:;~.R E C:. T 3227 3087 3000 :!.40 26 · -q .u q 7 :4 ! 87 :q I 0 c) 170 30 3490 3287 3200 203 33 3627 3387 3300 2.~0 37 3783 3487 3z~ 00 276 36 3900 4038 4178 4314 4`4`B:!. 4 S89 --'+726 4863 SO00 S'~ ~ a 5420 S563 $710 5862 6013 6160 6301~ 64~9 6592 6735 6878 7019 7159 7299 ~.,58 7 3500 313 37 3687 3600 BS :1 38 ~ 7,..47 3700 389 38 3887 3800 '"+27 38 3987 3900 ~64` 37 4,087 4000 502 38 4:1.87 4:100 539 37 4`287 4200 576 37 4`.::.87 ~300 613 37 4%87 .%400 651 38 ~587 4500 692 41 4`687 4` 600 733 4787 4-700 776 .~ 887 4-800 823 47 4987 4` 900 87 S S2 5087 SO00 926 51 5187 S:IO0 973 4`7 5287 S:200 .I 0:1.7 44 5387 5300 1062 5587 5500 1 :l.l+ 8 ~+3 S687 E-,600 :1191 43 5787 5700 I232 4:1 S887 5800 i 272.-! -% 0 S987 S900 :!312 4-0 REL. ATIVE COORDINA'IES F:ROM MEt.L.-HEAD 508.88 S 584-. 8:1. S 667.4% S 753.90 S 83-q. 64 S 263.83 E 295.15 E 328.25 E 363.98 E 407.77 E:T 9:1.4.56 S 994.4`6 S 1073.98 S 1153.89 S :1.233.76 S 457.57 E 508.57 E S59. 99 E 610.9:i. E- 66:1.99 E :1.5~ 13 1-% '-' 1391.98 S 1470.75 S :ISSO. 39 S :1832. :1.6 S 712.83 762.66 E 8;1.2.86 E 863.20 E: 9:1.2.77 E :!.716.08 S 1801.36 S :I. 889.3~t S :1981+. 28 S 2085.23 S 964.65 E 0 '.I, 6.33 F.: 1068.89 E .'I, 20.72 174.05, E 2 :l 8 S. 7:1. S 2280. 65 S _,3 ~'~... 7~ S 2~63. 37 S 25F53. :!.E, S 264` :t.. 82 S 272..?.9.97 S 28."!.5.94. S 2900.97 S :14`77.67 E 1528.20 E I~-''~= 23 tE =.~ ~' -t.3 . :1628.33 E :!678.6,6 E Y-08 RE-DR] LL DATA .t'NTERPOLATE::D FOR EVEN !00 FEET OF SUBSEA DEPTH MEAS. TRU VERT SUB SEA MD--TVD VERT1'CAL DEPTH DEPTH DEPTH D.'f FF. CORRECT 7438 6087 6000 :1351 :39 7577 61.87 6200 :I. 390 39 77 !,7 6287 6200 2430 40 7880 6387 630 0 :1.473 43 8004 6487 6400 1.5:17 44 8148 8293 8438 8583 8729 8876 9024 9273 9320 9575 9692 9809 9925 ].0042 1.01.58 10274 10390 10527 10648 1091'I. 7 I,.'.I. 062 11241. 11 S S 2 Y ~: ~'~ 6500 !. S 6 I. 44 6687 6600 ! 606 45 6787 6700 2651 45 6887 6800 1696 45 6987 69 0 0 17 4 2 4 6 7087 7000 2789 47 7187 7100 1.837 48 7287 7200 2886 49 7387 7300 1933 47 7487 72+00 :1.964 31 7587 7SOO 2988 24 7687 7600 2005 !7 7787 770o_ =~022. I7 7887 78. 0 O_ ~_o o 38 I 6 7987 7900 2055 17 8087 8000 207 :I. 26 81.87 81. 00 2087 16 ~oo~' 8200 ~ I. 03 16 ,a.o ~.~"~' aoa 0 2:1.30 27 8487 8400 2 ! 6:1 31 8587 8500 2:1,95 34 '-*~a~ 8600 2230 35 8787 8700 2275 45 8887 8800 235~ 79 8987 ~°00 oF;zq = ! ! R[:::I...AT l VE COORD :[ NAT ES FROM WELL--HEAl) 3066.55 S 312+9.07 S 3234.06 S 3321.08 S 3409.39 S 1728.00 E :!.778_38 E I829.38 E I88!_71L :1.935.85 E 3498.75 S 3588.80 S 3679.05 S 3769.67 S 3861.44 S 1988.39 E 204:1..75 E 2148.49 E 2202.71E 3954.20 S 4047.89 S 4142.22 S 4236.12 S 4307.99 S 4380. 64 S 4438. S8 S 4496. S9 S 4554.7! S 46:1.;:i?. 9:t. S 2482.99 E 250:I.. 1.8 E 251 S_ 68 E 2529.35 E 2543. '.'37 E 262 J..o ~ 2634. I0 E 2646 . 27 E 2653.27 E 2697.41. E Y-.08 RE-.DR]' LL DATA INTERPOLATED FOR EVEN 3.000 FEET OF MEASURED DEPTH MEAS. TRU VERT SUB SEA DEP!'H DEPTH DEPTH ~000 I000 9].3 2000 !998 3000 Pgo~; ... 4000 36[59 3572 5000 4387 4300 6000 5078 499]. 7000 5774 ~5887 8000 648~ 8397 9000 7].7]. 7084 10000 7953. 7864 ].I000 8786 8659 3.2000 90II~ 8927 REt.,AT]VE COORDINATLS FROM WEL.L-HEAD ,]..03 S 0.3¢5 W 30 OB c.' 2E:.87 E 384.4S S 21!.:19 E 972.2-2_8 S 494.54 E 15. S0.46 S 8¢:.'.,3 . 25 F: 2].77.0..r.'.'.5 S .I. 22:]..25 E 280'4.33 .:.-,,'-' :1.571 .73 E 340~:.,. 97 S ].9.34.3,r3 E 4032.28 S 2305.3:I. E 4592.26 S 2538. O0 E.-.- .t'..-;18].. 9.'1. S 264 ].. 06 E 6094.~..::,.1. S 282:1.99 E VERTICAL SECTION STA~ARB ALASKA PRODUCTION CO, Y-08 RE-ORILL SECTION AT S ii.25 E ~SCALE: t inch= i300 feet SCALE: i i5ch = i300 feet [DRA~N : 8/22/88 Marker Zdentlftcatton MO TVB OEPRT 41 ~8 0 0 0 6} END OF GYRO 9308 7376 4620 CI EE-DRILL KOP 9306 7378 4620 O] TO t2b-7§ 9044 7100 350{} 4§50 T V D 5250 7t5{} 78{}{} 9750 i1750 8800 2~50 Departure 4550 5'2.00 58b-X) 6,500 7t50 Marker- Identification BI ENO OF G¥80 C] RE-DRZLL 80P o o o 9308 7378 4620 9308 7378 4680 i2575 9044 7i00 HORIZONTAL VIEW Y-OB RE-BRZLL CLOSURE: 7285 ft S ~4.~ E DECLINATION: 38=.88 dec E SCALE: i inch t200 feet DRA~N: 8122/88 2~0 3808 4200 4800 5400 6800 7~08 7800 ,[ TELE£DI Teleco Oilfield Se..es of Alaska Inc. 61 16 Nielson Way  Anchorage, AK 99502 (907) 562-2646 August 12, 1988 JOB #640 STANDARD ALASKA PRODUCTION CO. WELL: Y-8A RE-DRILL PRUDHOE BAY RIG: NABORS 18E Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to Standard Alaska Production Company. Teleco is committed to providing the highest quality MWD service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Dave Reimer Field Service Supervisor DR/el Enclosures A ,~$#/I~T COMPANY Date 08/10/88 Company: Well: Location: Rig: TELECO OILFIELD SERVICES JOB 640 SURVEY CALCULATIONS STANDARD ALASKA PRODUCTION CO. Y-SA RE-DRILL PRUDHOE BAY NABORS 1SE Page 1 TELECO Job # 640 TAK Grid Correction: Magnetic Declination: Total Correction: Proposed Direction: 0.00 degrees 30.62 degrees 30.62 degrees 168.75 degrees RADIUS OF CURVATURE CALCULATION MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' **************************************************************************************************** TIE IN TO GEARHART MWD 10871.00 42.5 173.5 S 06 30 E 8652.95 5508.42 5092.70S 2632.52E 5732.86 S 27.335E 0.000 TELECO MWD SURVEYS 10905.00 42.9 172.4 S 07 36 E 8677.93 5531.41 5115.58S 10941.00 43.2 173,7 S 06 18 E 8704.24 5555.91 5139.97S 10973.00 44.8 173.1 S 06 54 E 8727.26 5578,07 5162.05S 11005.00 47.0 173.8 S 06 12 E 8749.53 5600.97 5184.88S 11036.00 49.2 173.7 S 06 18 E 8770.23 5623.95 5207.81S 2635.35E 5754.49 2638.32E 5777.55 2640.87E 5798.36 2643.50E 5819.89 2646.01E 5841.46 S 27.256E 2.490 S 27.171E 2.603 S 27.094E 5.167 S 27.015E 7.052 S 26.934E 7.101 TELECO Job # 640 TAK MEAS DIRECTION TRUE VERTICAL DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION feet deg deg deg/min feet feet 08/10/88 Page 2 COORDINATES CLOSURE DOG LEG N/S E/W DIST ANGLE SEVERITY feet feet feet deg deg/100 ' 11067.00 50.7 1'75.8 S 04 12 E 8790.17 5647.55 5231.44S 11099.00 52.8 176.9 S 03 06 E 8809.98 5672.46 5256.52S 11130.00 54.6 176.5 S 03 30 E 8828.34 5697.20 5281.46S 11164.00 56.3 177.0 S 03 00 E 8847.62 5724.93 5309.42S 11193.00 57.7 178.3 S 01 42 E 8863.41 5748.96 5333.72S 11224.00 61.3 177.6 S 02 24 E 8879.14 5775.32 5360.41S 11256.00 63.0 175.8 S 04 12 E 8894.09 5803.34 5388.65S 11288.00 64.6 174.8 S 05 12 E 8908.22 5831.86 5417.27S 11320.00 66.6 174.1 S 05 54 E 8921.44 5860.86 5446.27S 11351.00 68.6 173.0 S 07 00 E 8933.25 5889.42 5474.75S 11383.00 70.2 171.9 S 08 06 E 8944.51 5919.31 5504.44S 11414.00 72.3 171.2 S 08 48 E 8954.47 5948.63 5533.47S 11446.00 74.4 171.2 S 08 48 E 8963.64 5979.25 5563.77S SIDETRACK OFF PLUG 11472.00 75.8 168.9 S 11 06 E 8970.33 6004.37 5588.52S 11508.00 77.3 167.2 S 12 48 E 8978.70 6039.38 5622.77S 11542.00 79.5 165.3 S 14 42 E 8985.53 6072.65 5655.12S 2648.18E 5863.52 2649.78E 5886.62 2651.21E 5909.55 2652.80E 5935.26 2653.80E 5957.45 2654.75E 5981.78 2656.38E 6007.82 2658.73E 6034.54 2661.55E 6061.83 2664.77E 6088.83 2668.71E 6117.26 2673.02E 6145.27 2677.70E 6174.60 2682.04E 6198.78 2689.29E 6232.80 2697.20E 6265.40 $ 26.849E 7.093 S 26.752E 7.096 S 26.656E 5.899 S 26.549E 5.145 S 26.453E 6.118 S 26.347E 11.775 S 26.241E 7.277 S 26.141E 5.732 S 26.044E 6.559 S 25.954E 7.238 S 25.865E 5.946 S 25.784E 7.104 S 25.700E 6.565 S 25.637E 10.102 S 25.561E 6.202 S 25.499E 8.475 TELECO Job # 640 TAK 08/10/88 Page 3 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' 11574.00 81.8 165.3 S 14 42 E 8990.73 6104.17 5685.66S 11606.00 84.0 165.6 S 14 24 E 8994.69 6135.87 5716.40S 11656.00 87.5 163.9 S 16 06 E 8998.39 6185.60 5764.49S 11686.00 87.5 163.5 S 16 30 E 8999.70 6215.45 5793.26S 11718.00 87.3 163.9 S 16 06 E 9001.15 6247.30 5823.94S 11788.00 87.5 163.9 S 16 06 E 9004.33 6316.98 5891.14S 11846.00 87.4 163.5 S 16 30 E 9006.91 6374.70 5946.75S 11906.00 87.5 162.5 S 17 30 E 9009.57 6434.33 6004.07S 11970.00 87.3 163.2 S 16 48 E 9012.48 6497.93 6065.16S 12036.00 87.3 163.2 S 16 48 E 9015.59 6563.55 6128.29S 12098.00 87.0 162.8 S 17 12 E 9018.67 6625.16 6187.50S 12162.00 86.6 163.2 S 16 48 E 9022,24 6688.73 6248.61S 12226.00 86.4 163.5 S 16 30 E 9026.15 6752.33 6309.81S 12289.00 86.8 163.5 S 16 30 E 9029.89 6814.96 6370.12S 12353.00 87.4 163.9 S 16 06 E 9033.12 6878.63 6431.47S 12446.00 87.0 162.8 S 17 12 E 9037.67 6971.11 6520.46S 12551.00 86.7 161.8 S 18 12 E 9043.44 7075.29 6620.34S 2705.20E 6296.42 2713.18E 6327.60 2726.29E 6376.68 2734.70E 6406.28 2743.67E 6437.86 2763.03E 6506.91 2779.29E 6564.17 2796.82E 6623.53 2815.67E 6686.87 2834.69E 6752.14 2852.79E 6813.49 2871.47E 6876.81 2889.78E 6940.07 2907.61E 7002.33 2925.55E 7065.60 2952.16E 7157.63 2984.04E 7261.78 S 25.445E 7.189 S 25.390E 6.937 S 25.312E 7.777 S 25.270E 1.332 S 25.225E 1.399 S 25.127E 0.299 S 25.050E 0.712 S 24.977E 1.673 s 24.902E 1.137 S 24.823E 0.085 S 24.752E 0.807 S 24.681E 0.883 S 24.607E 0.563 S 24.534E 0.640 S 24.460E 1.126 S 24.359E 1.257 S 24.263E 0.993 TELECO Job # 640 TAK 08/10/88 Page 4 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/t00' **************************************************************************************************** PROJECTED TO TD 12584.00 86.7 161.8 S 18 12 E 9045.34 7107.99 6651.64S 2994.31E 7294.54 S 24.235E 0.170 TELE£O ~ i 1 f i ~ 1 d S~rv i c~s PLAN ViEW 2600 2800 9000 :9200 :94.00 5000 5200 5400 5800 8000 6200 9600 ! 6400 :98O0 6800 EAST I ~OOD ~500 I 1 1i CO 1 ,'=R~.~,--.,,.. Sr_CTiON S~ando~d Alaska P~'oduc fion Company 900 Eos! Benson Boulevo,d P.O. Bo. 196612 Anchoroge, Alosko 99519-661~2 (90,7) .564-51 ] 1 ARCO EXXON STANDARD ALASKA PRODUCTION Date: 09/14/88 PHILLIPS %0: T~: 79298 STATE OFAK SYSTEMS '.(Transmittal & Tape) ARCHIVES SAPC MAGNETIC LIS TAPES & LISTINGS The following material is being subaitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: Y-08A OH/NL/MWD 09/12/88 #- 10954-12852 Tape Pos.#06058 NL Baroid #88-04-14 1600bpi API#50-029-2057201 * EXXON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm this. TferDietz ION O~%qRDL Date Well Records LR2-1 A u,,,! o¢ the o,,9,.o! S,ondo,d O,I Co.-pony Fou,,ded ,,, ('le.eln-d C~,o ,n 18TCt Slandard Alasl~ a Production Compaq% ~ 900 East 8,.unson Boulevard P.O. ~ 196612 Anchoroge. Alosko (907) 564,511 I HOUSTON ARCO CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS INDEXED STANDARD ALASK~ PRODUCTION Date: 08/17/88 79216 The following material Is being submitted herewlth. Please acknowledge recelpt by slgnlng a copy of this letter and returning It to thls office: ., A-23 CCL/Bridge Plug Srtting 06/22/88 #1 10400-10606 GO 5" J-02 CCL/Perf 07/06/88 #1 9806-10230 GO 5" R-23 CCL/Perf 06/16/88 #1 11700-12050 GO 5" S-20 Continuous Flow Survey 07/05/88 #1 9160-9710 GO 5" S-20 Diff/Temp/Log 07/05/88 #1 9000-9720 GO 5" Y-08A Collar 06/23/88 #1 2200-2900 GO 5" Jennifer Dietz ~ NFOP34AT ~ ON CON TRO~ Wel I Records LR2-1 MEMORANDUM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION / /I(-'7~Y' DATE: June 22, 1988 'TO: Lonnie ¢ Smith ~, '-' Commissioner ~LE~O: D.~DA.122 THRU: Michael T Minder ~-'~,~,~ Sr Petroleum Engineer TELEPHONE NO: SUB0 EGT~ Wellbore Plugs SAPC PBU Y-8A Permit No 81-34 Prudhoe Oil Pool FROM: Doug Amo~ Petroleum Inspector Wednesday, June 15, 1988: I traveled this date from AAI PBU DS7-34 weil'to'S~C PBU~YfsAWell to witness the tagging of a balanced cement plug set across the 7" x 9 5/8" liner lap. At 1:00 p.m. RIH with open-ended drill pipe and tagged the plug with 30,000 pounds of drill string weight at 10,897' (ft). This gave a cement plug of 23' above the liner lap. POH and prepare to set second plug on top of first. Thursday, June 16, 1988: At 1:30 p.m. after waiting on cement for 16 hfS,' RIH and~tagged the second liner lap plug with 20,000 pounds of drill string weight at 10,833'. This was 74' above the liner lap, because there was not the required 100' of cement. I contacted Mike Minder and was given his approval to accept this plug and to let the operator continue with their operations. Attached is a copy of the Wellbore schematic for SAPC PBU Y-8A well. In summary, i witnessed the tagging of the balance cement plug across the 7, x 9 5/8" liner lap at SA_PC PBU Y-SA well. .f Attachments 02-001A (Rev. 8~85) PBU pLUGGING DIAGRAM WELL Y-8 (32-03-10-13) Diagram shows various casing points and cement plUgs in hole. Picture of well prior to milling section of 9-5/8' casing. TVD (BKB) MD (BK..B) 20"X30" CONDUCTOR 110 FT 110 FT BRINE 13-3/8" 72#/FT L-80 BUTT 2659 FT 2712 FT CUT AND PULL 9-5/8" CASING TO 2904 FT REPLACE WITH NEW 9-5/8" NSCC 3000 FT WINDOW TO BE MILLED IN 9-5/8" CASING FOR DRIllING HORIZONTAL 8-1/2" HOLE 7392 FT 929O FT LINER LAP ISOLATION PLU~ '~4-' ~ /O, ~'~"~ j TOP OF LINER 8468 FT 10907 FT 9-5/8'" 47'#iFT L-80 BUTT 8865 FT 11404 FT 11548 - 11630 FT CEMENT PERF. PLUG TO EXTEND 100 F-r ABOVE AND BELOW PERFORATIONS PBTD (PACKER JUNK) 7" @ 12365' MD (9633' TVD) 11999 FT JWB/6-7-88 May 20, 1988 Telecopy: (907) 276-7542 Mr. Ted Stagg PBU Drilling Engineering Supervisor Standard Alaska Production Company P.O. Box 196612 .AAnchorage, Alaska 99519-6612 Re: Prudhoe Bay Unit ~ Standard Alaska Production Company Permit No. 88-56 Sur. Loc. 1353'-SNL, 5270'WEL, Sec. 34, TllN, R13E, UM. Btmhole Loc. 2720'SNL, 2300'~WEL, Sec. 03, T10N, R13E, UM. Dear Mr. Stagg: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us'in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing'shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. Very, trulz~ ~urs, C~V. Cha f~ to~n~ Chairman of Alaska Oil and Gas Conservation Co~ission BY ORDER OF ~E CO~,~ISSION dlf Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o enc!. STATE OF ALASKA ~' ALASKA OIL AND GAS CONSERVATION COMMISSION PER IT TO DRILL 20 AAC 25.005 la. Type of work Drill [] RedrillE]llb. Type of well. Exploratory[] Stratigraphic Testl-I Development OilE] Re-Entry [] Deepen!-II Service [] Development Gas [] Single Zone [] Multiple Zone [] :2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Standard Alaska Production Company KBE=87.12feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property D~esignation Bay Pool P. O. Box 196612, Anchoraoe, Alaska 99519-6612 ADL 47471 v ¢. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) 1353' SNL, 5270' WEL, SEC 34, T11N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 1715' SNL, 2500' WEL, SEC 03, TION, R13E Y-8A (32-03-10-13) KOO683449-G-14 At total depth 9. Approximate spud date Amount 2720' SNL, 2300' WEL, SEC 03, TION, R13E June 20, 1988 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (aD and TVD) property line ADL 47472 2300 feet Y-23 @ 35 feet 2560 12573' MD 8955' TVDs feet 16. To be completed for deviated wellst~o~,2 3_0802" 87° 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) KicKoff depth 9308 feet Maximum hole angle 48.1 o Maximum surface 3300 pslg At total depth (TVO) 8800 4390 psl~ 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20"x30" Cond. Surface 110' 110' 8 cu yds 17-1/2" 13-3/8" 72# L-80 Butt 2662' Surface 2712' 2659' 3720 cu fl Existing 12-1/4" 9-5/8" 47# L-80 Butt 9260' Surface 9290' 7365' 1670 cuft Window Depth 8-1/2" 5-1/2" 17# SM~3CreO VAM-ACE 2488' 9058' 7210' 11546' 8987' 831 cuft 8-1/2" 4-1/2" 12.6~ L-80 TDS 1027' 11546' 8987' 12573' 9042' Slotted Line r 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 12375 feet Plugs (measured) TBA true vertical 9641 feet Effective depth: measured 11989 feet Junk (measured) true vertical 9342 feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor (See Attachment 1) Surface Intermediate Production Liner Perforation depth: measured 11548'- 11630'MD (4 intervals) true vertical 8899'- 8967' TVDss 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch[] Drilling program [] Drillincj fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify that th,~f~f~going is true an~ cor Signed ~ ~'/)/~~ Title PBU Drilling Engineering Supervisor Date "" ~ ' /~" Commission Use Only I ISee cover letter Permit Number / IAPI number Appr°~/~l/(;J)a~e/88 ~ -..5-6 j5 o- c:)~_ 9-,~o.5"z other requirements Conditions of approval Samples required [] Yes ~[NO Mud log required I-lYes ER No Hydrogen sulfide measures [] Yes~l~! No Directional. survey required ]~ Yes [] No Required work~,4;~7.~/~~10M; []15M; Other: - by order of Approved by ~k~ -,, /, ~, '/,~'~"~ Commissioner me comm,ssion Bat Form 10-401 Rev. Submit,~ · - ', STATE OF ALASKA " t~ ~ ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS · Type of Request: Abando uspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program r'! Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other [] Name of Operator Standard Alaska Production Company Address P. O. Box 196612, Alaska 99519-6612 1363' SNL, 10' EWL, Sec. 34, Ti11N, R13E, UPM At top of productive interval 1712'SNL, 2210' WEL, Sec. 03, TION, R13E, UPM At effective depth 1918' SNI, 2167' WEI_, Sec. 03, TION, R13E, UPM At total depth 2206'SNL, 2100'WEL, Sec. 03, TION, TION, R13E, UPM 5. Datum elevation (DF or KB) KBE=87.12 feet 11. Present well condition summary Total depth: measured 6. Unit or Property name Prudhoe Bay .Unit 7. Well number Y-8 (32-03-10-13) PBU 8. Permit number ,. 81-34 9. APl number 5 0 - 029-20572 0. Pool Prudhoe 0il Pool 12375 feet Plugs (measured) true vertical 9641 feet BKB Effective depth: measured 11989 feet Junk (measured) true vertical 9342 feetBKB Casing Length Size Cemented Measured depth Structural -- Conductor 60' 20" x 30" 8 cu. yds. 110' S u rface 2662' 13-3/8" 3720 cu. ft. 2712' Intermediate 11354' 9-5/8" 1800 cu. ft. 11404' Production -- Liner 1458' 7" 430 cu. ft. 10907'-12365' Perforation depth: measured 11548'- 11630' ( four intervals) true vertical 8899'- 8967' True Vertical depth BKB · 110' 2659' 8865' 8468'-9633' Tubing (size, grade and measured depth) 2-7/8" EUE 8rd to 11308' with 2-7/8" tailpipe. Na~ka Oil & Gas Con~. Commbsl0rl Packers and SSSV (type and measured depth) 7" Baker packer at 11308'; 2-7/8" SSSV at 2074'. 12. Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] ..... 3. Estimated date for commencing operation June 20, 1988 14. If proposal was verbally approved Name of approver Date approved '15. I here~by ~e forejgoil3g is tr~e aqd/~coj'rect to the best of my knowledge ned ~_~ .~ ~ ~"~itle PBU Workover/Completions Supervisor Commission Use Only Conditions of approval Notify commission so representative may witness IApproval No. [] Plug integrity [] BOP Test El.l~cation clearance I Approved L;opy ORIGINAL SIGNED BY Returned - LONNIE C. SMITH ~/~ by order of Approved by Commissioner the commission Date :orm 10-403 Rev 12-1-85 Submit in triplicate ATTACHMENT I Y-8A (32-03-10-13) Casinq Structural Conductor Surface Intermed. Product. Liner Lenath 60' 2662' I 1354' 1458' Size 20"x30" 13-3/8" 9-5/8" 7" Cemented 8 cu yds 3720 cuft 1800 cu ft 430 cu ft Measured Depth 110' 2712' 114O4' 10907'-12365' True Vertical depth 110' 2659' 8865' 8468'-9633' PROPOSED REDRILL AND COMPLETION PROGRAM WELL Y-8A (~2-0;5-10-13} PBU The drilling fluid program will consist of a 9.2 ppg oil base mud for drilling the 8-1/2" hole from 9308' MD to 12573' MD. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3300 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Kick-off of cement plug at 9308' MD and directional drill 8-1/2" horizontal hole to TD of 12573' MD. Run a combination 5-1/2", 17# solid/4-1/2", 12.6# slotted liner from TD to 250' above kick-off point (9058'MD) and cement solid portion of liner with Class G cement. Clean out 5-1/2" liner to slotted portion and displace slotted liner with diesel. Change over to 9.6 ppg NaC1 completion fluid. Run 9-5/8" production packer on 4-1/2" tubing with a sliding sleeve and GLM's. Set packer 120' above top of liner. A subsurface safety valve with dual control lines will be placed 50' below base of permafrost. Install and test xmas tree. Set and test packer. Displace tubing to diesel. Tubing Size: 4-1/2", 12.6#, L-80, A/B Mod. Butt with GLM's Tailpipe Size: 4-1/2", 12.6#, L-80, Butt. J~W~/5-12-88 4-1/2" Tubing w/ GLM's WELL Y-8A COMBINATION SOLID/SLOTTED LINER T.O.L. @ 9058'MD 9-5/8" Window 9290' MD 5 1/2" LINER SOLID PORT COLLAR & SWIVEL 4 1/2" LINER SLOTTED CTC PACKER TD @ 12573' MD (9042'TVD) 87° Hold Angle Section Target @ 11546' M D (8987'TVD) JWB/5-12-88 7:~,00 78O0 TVD 2000 S~AL£ I "s I O001=T · 4O00 45O0 5OO0 55O0 ¥*SECTION PLANE,~ SI I ' I$'E SURYE't' s .8074.04.8S0 PROPOSAL ~ PO060~. 1 SO 6O00 65O0 7500 STANDARD ALASKA PRODUCTION COMPANY 5956000I, !' 5944000- 5942000 · 594oooo ~ ~' ~4~ooo 04, ~'N' ~' '~ I 1PL,,AOHM 11. 642000 644000 64600.3 648000' 650000 ,: ::,200C,' ' M~ _ Choke Manifold Poor Boy Degasser . Brandt Vacuum.Type Degasser Brandt Dual Tandem Shale Shaker Pioneer Mud Cleaners Pioneer M~I Centrifuge T,RIP TAI~K T Y f:~ IqO ~3B. TO PIT I'lAt,,J I ~'o 1 - Recording drilling fluid, pit 'level indicator with both visual and audio warning devices at driller's console 1 - Trip Tank (75 BBL.) · 1 - Drilling fluid flow sensor with readout at driller's console 11 - 5 Hp Agitators 4O I0 04 ZO 30 40 02 OI Y-,23 0 2 (Proposed) 29 28 ¥-4 (Actual) 03 Y-6 (Actual} Y-22 (Actual) (Actual) Y-19 (Proposed) Y-20 (Proposed) Y-24 ( Proposed ,L 33 z58' Y-~2 Y-II Redr ill (Actudl) [Actual)_~ 2492' ,,~ ---~-0 L 2780' Y-21 (Proposed) POIRTION OF T II N, IR i:5 E, UM SCALE t"=1/2 MILE io 2_0 ~_2 7.__ 3z6~' Y-2 (Actual) _j 2106'm Y-7(Actual) LAT. : 70° 6'0561" LONG.: 148°49' 21.96" x: 645,57534 Y'- 5,949,065 22 30 40 I "0 -~ (Actual) J GRID _(~-- .I.2_ ~_6_6_'. i 3170 (Actual) (Actual) u3 CERTIFICATE OF SURVEYOR I hereby certify that lam properly registered to practice land surveying in the Sfafe of Alaska and that this plat represents a location survey of the wellpad shown and the wells thereon. This survey was made by me or under my supervision and all dimensions and other details are correct. Bottom hole locations are furnished by others. Surveyor PAD DETAIL $CAL E i"= _%00' ($4-22-11-15) · Y- / (2~-27-1/~/3) · y.2 j ( ~4-34-11-1~J Y-5 (2J-28-11-1~] · Y-5 j (13- 4 - !L'- /5/ ~e Y-24 ZO'- - -. (44-2m- //-/.~) [ e r- 22 (42-3~-I1-IZ) ~--, Y- Add Proposed BHL Y--2~ Add Proposed BHL Y- 19 & Y-2~ 2 Revise BHL Y-7,8,9,10,12,~ 13 from Proposed to Actual 1~20/81 Add Proposed BHL Y-13 7/14/8! PJR Add Proposed BHL Y- I0 4 / 3 /Gl PJR Revise BHLY- 3,4,& II from Proposed to Actual 4/ 3 /8l PdR Add Proposed BHL Y - 9 3 / 23/8i DHO Add Proposed BHL Y-8 3 /~ /81 PJR Revised Proposed BHLY-7 2/2/8~ PJR Add Proposed BHL Y- 7 I/28/8i P JR Add Proposed BHL Y-12 10/9/80 PJR Add Proposed BHL Y- II 9/26/80 PdR Ail Bottom Holes are 8800' sub see Revised BHL Y- t,2,5 ~6 from Proposed to Acluol NOTE: Plat dated Aug 30~ 1979 changed to Oct. 2~ !979 BHL I 5 ~ 6 chan~ed C.d R AS - STAKED PAD "Y" Located in NE t/4 ~ NW i/4 PROTRACTED SEC 33 ~ ~,T lin ,R Surveyed for Date "~ ~ ~.~. ~ ~ ~ -. NOTE: All bottom holes ore 8800' subseo. i i i i i SOHIO PETROLEUM CO. Surveyed by F. M. LINDSEY 8, ASSOC. LAND & HYDROGRAPHIC SURVEYORS 2502 West Northern Lights Boulevard Box 4 ~ 081 Anchorage Ai~sk~ i ii i 8.O.P. STACK CONFIGURATION 13-5/8 IN. TRIPLE RAM STACK SO00 PSI WP DRILLING ANNULAR PREVENTER ! ! I ! PIPE RAMS , ,! ! I §LIND RArlS I Z IN. KILL LINE GATE GATE DRILLING SPOOL I PIPE RAMS , I 'I GATE 4 IN. CHOKE LINE HAND HYD. ASST. GATE .STANDARD ALASKA PRODUCTION COMPANY Prudhoe Bay Well Y-8A Close Approach Analysi~ The existing well Y-8 is to be plugged and sidetracked to a new bottom- hole location. This new bottom-hole location (well) will be called Y-8A. Well Y-8A will be a horizontal drainhole with a proposed bottom-hole location close to the old Y-8 location. From the plan view, the new wellbore (Y-8A) will be displaced approximately 300 feet from the old wellbore (Y-8) and from the section view, the new wellbore will drop below and cross beside the old wellbore (see attached directional map). The closest well other than Y-8 is the PLAGHM State #1 well which is 1600 feet to west of the proposed well Y-8A (see attached circles map). Based on these facts, there will be no close approaches with other wellbores in the area. A maximum allowable distance will be maintained from the old wellbore of Y-8. JWB/5-13-88 uh~:~;~, gl~l' ~'OK -N~:w WELL PERMITS ITEM (I) Fee (2) Loc APPROVE DATE (2 thru 8) (8) (3) Admin .4~ 0~ 5-~S[~ -- (9 thru 13) (10 and 13) (4) Casg ~.~ (14 thru 22) (23 thru 28) Company Lease & Well No. 1. Is the permit fee attached .......................................... YES NO , (2.9 thru 31.) (6) Add: 2. Is well to be located in a defined pool ............................. ..~ 3. Is well located proper distance from property line .................. ~ 4. Is well located proper distance from other wells .................... ~._ 5. Is sufficient undedicated acreage available in this pool ..' .......... ~ 6. Is well to be deviated and is wellbore plat included ................ z2F 7. Is operator the only affected party ................................. ~_ 8. Can permit be approved before fifteen-day wait ...................... ~ Does operator have a bond in force .................................. ~ Is a conservation order needed ...................................... ~ Is administrative approval needed ................................... ~ ,, Is the lease number appropriate ..................................... ~ Does the well have a unique name and number ......................... ~ ....... i 10. 11. 12. 13. Is conductor string provided ........................................ Will surface casing protect fresh water zones ....................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will'all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on i0-403 ............ Is adequate wellbore separation proposed .... , ....................... 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. Is a diverter system required ....................................... 24. Is the drilling fluid program schematic and list of equipment adequate~ 25. Are necessary diagrams and descriptions of diverter and BOPE attached. 26. Does BOPE have sufficient pressure rating - Test to ~oo psig .. 27. Does the choke manifold comply w/API RP-53 (May 84) .................. 28. Is the presence of H2S gas probable ................................. For exploratory and Stratigraphic wells: 29. Are data presented on potential overpressure zones? ....... ......../ 30. Are seismic analysis data presented on shallow gas zo~l;':..l....~.. 31. If an offshore loc., are survey results of seabed conditions 32 Additional requirements ' · Iltllllllllllllllllllllllllltllllttltllllelll Geolo~7: EngSn_eering: rev: 02/17/88 6.011 ..... INITIAL GEO. 'UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE , Additional Remarks: ,, Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX~ No special'effort has been made to chronologically organize this category of information.