Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-186
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 06-22B C/O LTP, Adperf, Plug perfs Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-186 50-029-20806-02-00 11170 Surface Intermediate Scab Liner Liner Liner 9039 2482 9273 6739 1139 1671 9519 13-3/8" 9-5/8" 7" 7" 2-3/8" 8121 26 - 2508 24 - 9297 2348 - 9087 9117 - 10256 9489 - 11170 26 - 2508 24 - 7914 2348 - 6517 7753 - 8828 8092 - 9039 unknown 2670 4760 5410 5410 11780 9519 , 10884 5380 6870 7240 7240 11200 10465 - 11155 3-1/2" 9.2# L-80 22 - 9681 8997 - 9039 Conductor 79 20" 26 - 105 26 - 105 1490 470 4-1/2" Baker Premier , 7397 , 6439 No SSSV 7397 , 9471 6439 , 8076 Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com 907.564.4061 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 22 - 8275 34 0 12497 0 146 0 0 0 305 0 N/A 13b. Pools active after work:PRUDHOE OIL 4-1/2" Baker Premier , 9471 , 8076 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Attempt: By Grace Christianson at 4:13 pm, Oct 02, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.09.29 07:51:42 - 08'00' Bo York (1248) RBDMS JSB 100323 WCB 3-13-2024 DSR-10/5/23 No adperfs shot or plugs set. The WRP fish wouldn't come OOH. -WCB ACTIVITYDATE SUMMARY 7/28/2022 ***WELL S/I ON ARRIVAL***(perforating) RAN 2.5" LIB TO 3-1/2" KB- LTP @ 9,489' MD ***WSR CONT ON 7-29-22*** 7/29/2022 *** WSR CONT FROM 7-28-22*** DRIFTED 1.80" WRP DRIFT TO 9,520' SLM SET 2-3/8" WFD WRP @ 9,502' SLM / 9519 MD (2.20' oal) ATTEMPT DDT ON TBG, BLED TBG FOR 45 MIN & PRESSURE REMAINED UNCHANGED (2450 psi) UNABLE TO POP WELL TO TEST DUE TO UPCOMING SHUTDOWN, DECISION MADE TO LEAVE WRP IN HOLE ***JOB SUSPENDED, WELL LEFT S/I, DSO NOTIFIED*** 8/22/2022 ***WELL S/I ON ARRIVAL*** (Perforating) POLLARD #60 CURRENTLY ON WEATHER HOLD DUE TO HIGH WINDS. ***JOB IN PROGRESS, CONTINUED ON 8/23/22 WSR*** 8/23/2022 ***CONTINUED FROM 8/22/22 WSR*** (RWO expense) RAN 2-3/8" WRP RETRIEVAL TOOL (Unpinned) TO 9,502' SLM (No pressure change). RAN 2-3/8" WRP RETRIVAL TOOL TO 9,502' SLM (Recovered fish neck & upper 10" of wrp). TAG REMAINDER OF 2-3/8" NS WRP W/ 1.75" L.I.B. AT 9,502' SLM (Impression of wrp collets). TAG BAKER 35KB LINER TOP PACKER W/ 2.80" G-RING AT 9,472' SLM. PULL 35KB LTP FROM 9,472' SLM & HANG UP AT 9,444' SLM IN 2 HOURS OF JARRING. JAR FOR 3 HOURS ON BAKER 35KB LINER TOP PACKER AT 9,444' SLM (No movement). ***JOB IN PROGRESS, CONTINUED ON 8/24/22 WSR*** 8/24/2022 ***CONTINUED FROM 8/23/22 WSR*** (Perforating) JARRED ON 35 KB LTP AT 7,372' MD FOR 6 HRS ***CONT ON 8/25/22 WSR*** 8/25/2022 ***CONT FROM 8/24/22 WSR*** (perforating) RECOVERED TOP 43" OF 35 KB LTP f/ X NIP @ 7372' MD (missing 1-1/2 elements & all 3 slips) RECOVERED 1/2" SLIP f/ TOP OF REMAINING FISH @ 9473' SLM w/ 2.60" MAGNET RAN 2.65" LIB TO LTP FISH, CLEAN IMPRESSION OF SEAL ASSEMBLY STUB (see log) RAN 3-1/2" BRUSH & 2.60" MAGNET TO LTP FISH AT 9,473' SLM (no recovery) PULLED LTP LOCATOR SUB (84") FROM 9,477' SLM, STILL MISSING BOTTOM SEAL ASSEMBLY (~6") ***CONT ON 8/26/22 WSR*** Daily Report of Well Operations PBU 06-22B JAR FOR 3 HOURS ON BAKER 35KB LINER TOP PACKER AT 9,444' SLM (No movement). (g JARRED ON 35 KB LTP AT 7,372' MD FOR 6 HRS (g) RECOVERED TOP 43" OF 35 KB LTP f/ X NIP @ 7372' MD (missing 1-1/2 elements & all 3 slips) (y) PULLED LTP LOCATOR SUB (84") FROM 9,477' SLM, STILL MISSING BOTTOM SEAL ASSEMBLY (~6") Daily Report of Well Operations PBU 06-22B 8/26/2022 ***CONT FROM 8/25/22 WSR*** (perforating) RAN 2.76" CENT, 8'x1.125" STEM, 2-3/8" BRUSH TO DEPLOYMENT SLEEVE AT 9,499' MD (see log) RECOVERED REMAINING LTP SEAL ASSEMBLY FROM 9,487' SLM W/ BRUSH & 1.85" MAG RAN 2-3/8" BRUSH & 1.85" MAG TO WRP AT 9,519' MD (no recovery) RAN 1.75" LIB TO WRP AT 9,519' MD (non-definitive, suspect element, see log) RAN 1.78" 2 PRONG WIRE GRAB TO WRP @ 9519' MD (no recovery, metal marks on grab) RAN 10' x 1.75" P-BAILER TO WRP @ 9519' MD (no recovery) RAN 1.90" BOWEN OVERSHOT w/ 1- 7/16" GRAPPLE TO WRP @ 9519' MD (unable to grab eq sleeve, no recovery, metal marks on edge) RAN 1.75" ROLLER DOG GRAB TO WRP @ 9519' MD (recovered 2 chunks of rubber element) RAN 1.85" MAG TO WRP AT 9,519' MD (recovered 3 small pieces of metal) RAN 1.75" ROLLER DOG GRAB TO WRP AT 9,519' MD (no recovery) RAN 1.85" MAG TO WRP AT 9,519' MD (no recovery) ***CONT ON 8/27/22 WSR*** 8/27/2022 T/I/O=2500/675/425 Assist SL, pump as directed Pumped 90 bbls crude down TBG for load. 8/27/2022 ***CONT FROM 8/26/22 WSR*** (perforating) RAN 1.75" HYDROSTATIC BAILER 3 TIMES TO WRP AT 9,519' MD (recovered 1/4" cup of rubber element pieces) RAN 1.75" RLR DOG GRAB TO WRP @ 9519' MD (no recovery) RAN MODIFIED 1.80" 2 PRONG WIRE GRAB TO WRP @ 9519' MD RAN 1.85" MAGNET 4 TIMES TO WRP AT 9,519' MD (recovered 1 slip & multiple corroded metal pieces) RAN 1.75" HYDROSTATIC BAILER TO WRP AT 9,519' MD (recovered ~1/4 cup rubber & small metal pieces) ***CONT ON 8/28/22 WSR*** 8/28/2022 ***CONT FROM 8/27/22 WSR*** (perforating) RAN 1.85" MAGNET TO WRP AT 9,519' MD (no recovery) RAN 10' x 1.75" PUMP BAILER TO WRP AT 9,519' MD (no recovery) RAN 1.80" 2-PRONG GRAB TO WRP AT 9,519' MD RAN 1.85" MAGNET TO WRP AT 9,519' MD (no recovery) RAN 1.75" ROLLER DOG TO WRP AT 9,519' MD (no recovery) RAN 1.90" BOWEN OVERSHOT TO WRP AT 9,519' MD (no recovery, metal marks on bottom) RAN 1.85" MAGNET TO WRP AT 9,519' MD (no recovery) RAN 10' x 1.75" PUMP BAILER TO WRP AT 9,519' MD (no recovery) RAN MODIFIED 2-PRONG GRAB TO WRAP AT 9,519' MD RAN 1.85" MAGNET TO WRP AT 9,519' MD (no recovery) RAN 1.75" HYDROSTATIC BAILER TO WRP AT 9,519' MD (no recovery, metal marks on bottom) RAN 1.75" LIB TO WRP AT 9,519' MD (impression of bypass sleeve) ***CONT ON 8/29/22 WSR*** 8/28/2022 Job continues from previous day. Assist Slickline (perf). Pump contingency. Relesed from job. SL on well upon departure. RAN 10' x 1.75" P-BAILER TO WRP @ 9519' MD (no recovery) (g) RECOVERED REMAINING LTP SEAL ASSEMBLY FROM 9,487' SLM W/ BRUSH & 1.85" MAG RAN 1.85" MAG TO WRP AT 9,519' MD (no recovery) RAN 1.90" BOWEN OVERSHOT w/ 1- 7/16" GRAPPLE TO WRP @ 9519' MD @(y) (unable to grab eq sleeve, no recovery, metal marks on edge) (g) RAN 1.78" 2 PRONG WIRE GRAB TO WRP @ 9519' MD (no recovery, metal marks on grab)g) (y) RAN 1.75" HYDROSTATIC BAILER TO WRP AT 9,519' MD (no recovery, metal marks on bottom)) RAN 1.75" LIB TO WRP AT 9,519' MD (impression of bypass sleeve) Daily Report of Well Operations PBU 06-22B 8/29/2022 ***CONT FROM 8/28/22 WSR*** (perforating) RAN 1.90" G. RING TO WRP AT 9,519' MD (see log) MULTIPLE RUNS w/ MODIFIED 1.75" G-RING MULE SHOE SPLIT SKIRT OVERSHOT (no recovery) MULTIPLE RUNS w/ 1.85" MAGNET TO WRP AT 9,519' MD (no recovery) RAN 1.78" SERATED G-RING FOR OVERSHOT TO WRP @ 9519' MD (no recovery) ***JOB POSTPONED, WELL LEFT S/I, DSO NOTIFIED*** 8/31/2022 ***WELL S/I ON ARRIVAL*** SET 2.81" DREAM CATCHER IN X NIP @ 7439' MD (34" oal) RAN 3-1/2" CHECKSET TO DREAM CATCHER @ 7439' MD (sheared) ***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED*** 10/15/2022 ***WELL S/I UPON ARRIVAL*** (perforating) PULLED 3-1/2" DREAM CATCHER ASSY FROM X-NIPPLE @ 7439' MD.(recovered small pieces of metal) TAGGED WRP FISH @ 9530' SLM W/ 1.50" LIB.(recovered impression) PLANTED BAITED OVERSHOT/SPEAR ASSY ON WRP FISH @ 9530' SLM (jarred for 2.5hrs) ***CONT WSR ON 10/16/22*** 10/16/2022 ***CONT WSR FROM 10/15/22*** (perforating) JARRED ON OVERSHOT/WRP @ 9,528' SLM FOR 1hr (3.5hrs total) ***WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** 10/17/2022 ***WELL S/I UPON ARRIVAL*** (perforating) R/U HES 759 SLICKLINE UNIT ***CONT WSR ON 10/18/22*** 10/18/2022 ***CONT WSR FROM 10/17/22*** (perforating) PULLED BAITED OS FROM WRP @ 9,528' SLM (3.5hrs total jarring, split os, missing 6 piece grapple) RAN 1.82" CENT, 1.75" MAGNET TO TOP OF FISH @ 9,529' SLM (recovered 1/4" x 2" piece of steel) RAN 1.82" CENT, 1.50" BLIND BOX TO FISH @ 9,529' SLM RAN 1.82" CENT, 1.75" MAGNET TO TOP OF FISH @ 9,530' SLM (recovered 2 of 6 pieces of grapple) ***CONT WSR ON 10/19/22*** 10/19/2022 ***CONT WSR FROM 10/18/22*** (perforating) RAN 1.82" CENT & 1.75" MAGNET TO 2-3/8" WRP @ 9,531' SLM RAN 1.82" CENT & 1" POCKET BRUSH TO 2-3/8" WRP @ 9,531' SLM RAN 1.82" CENT & 1.75" MAGNET TO 2-3/8" WRP @ 9,531' SLM RAN 1.82" CENT & 1.55" LIB TO 2-3/8" WRP @ 9,531' SLM RAN 1.82" CENT & 5/8" POCKET BRUSH TO 2-3/8" WRP @ 9,531' SLM RAN BOWSPRING & 1.75" MAGNET TO 2-3/8" WRP @ 9,531' SLM RAN BOWSPRING & 1.845" LIB TO 2-3/8" WRP @ 9,531' SLM RAN BOWSPRING & 1.9" SUB W/ 5/8" POKER TO 2-3/8" WRP @ 9,531' SLM ***CONT WSR ON 10/20/2022*** (g) JARRED ON OVERSHOT/WRP @ 9,528' SLM FOR 1hr (3.5hrs total) (g) PULLED 3-1/2" DREAM CATCHER ASSY FROM X-NIPPLE @ 7439' MD.(recovered small pieces of metal)) TAGGED WRP FISH @ 9530' SLM W / 1.50" LIB.(recovered impression) (g) PULLED BAITED OS FROM WRP @ 9,528' SLM (3.5hrs total jarring, split os, missing 6 piece grapple) Daily Report of Well Operations PBU 06-22B 10/20/2022 ***CONT WSR FROM 10/19/2022*** RAN BOWSPRING CENT & 1.75" MAGNET TO 2-3/8" WRP @ 9,532' SLM (light slip impression) RAN BOWSPRING CENT & 1/2" x 5.5" PRONG TO 2-3/8" WRP @ 9,532' SLM (TTL pins worked) RAN 1.90" BARBELL & 1/2" x 5.5" PRONG TO 2-3/8" WRP @ 9,532' SLM (TTL pins sheared) RAN 1.90" BARBELL & 1/2" x 12" PRONG TO 2-3/8" WRP @ 9,532' SLM (TTL pins sheared) RAN 1.90" BARBELL & 1.84" G.RING TO 2-3/8" WRP @ 9,532' SLM (fit over collet and contact EQ housing) RAN 1.90" BARBELL & 1.75" WRP EQ HOUSING RECOVERY TOOL TO 2-3/8" WRP @ 9,532' SLM(cut G-ring fork w/ TTL pins, lower pin sheared- trash in the way) LAY HES 759 DOWN FOR WINDS ***CONT WEATHER HOLD ON 12/21/2022*** 10/21/2022 ***CONT WEATHER STANDBY FROM 10/20/2022*** WEATHER STANDBY FOR HIGH WINDS FROM 12:00 TO 07:00 RAN QC,KJ, 3' 1-1/2" STEM, 1.50" BOWSPRING, 1.75" SUPER MAGNET(no recovery) RAN QC, KJ, 1.90" CENT,XO, 7" EXT, 7" EXT, 1.90" CENT, XO, 12" PRONG (1 ttl pin at the top to verify core rod pushed out of plug body, pin did come back sheared along with metal marks on bottom of prong sub) RAN QC, KJ, 3' 1-1/2" STEM, 1.50" BOWSPRING, 1.80" LIB (impression of broken grapple to the side of plug body). SWAB VALVE GATE STRIPPED OUT, CONTACTED WELL SUPPORT, THEY CONFIRMED. ***JOB COMPLETE, WELLHEAD SECURED, DSO NOTIFIED OF STATUS*** 10/22/2022 Inlilne Swab Valve rebuild. Barriers = MV & SSV. Verified barriers by performing independent LTT (passed) Removed Bonnet, Gate & Seats, inspected Seat Pockets (passed). Installed new Seats, Seals, Gate & rebuilt Bonnet. Pressure Tested assembly 300/low & 5000/high (passed). RDMO ***Job Complete** 11/16/2022 ***WELL S/I ON ARRIVAL*** RAN 3" LONG .62 PRONG W/ 1.90" GUIDE, JAR DOWN ON WRP @ 9531' SLM FOR 45 MINS, NO MOVEMENT, PRONG BENT OVER. RAN 1.75" MAGNET DOWN TO WRP @ 9531' SLM. ***CONT, WSR ON 11/17/2022*** 11/17/2022 ***CONT, FROM 11/16/2022*** JARRED DOWN ON FISH W/ 1.80" SAW TOOTH G.RING FOR JARRED DOWN ON FISH W/ 1.75" BLIND BOX ( first run blind box came back torn up with gash to one side at appeared to be a slip or grapple) JARRED DOWN ON FISH W/ 1.64" 4 BLADE STAR BIT RAN 1.75" MAGNET TO TOP OF FISH @ 9531' SLM IN BETWEEN JARRING RUNS (on the 2nd magnet run, recovered 1" piece of grapple 1"x3/4"). JARRED DOWN ON FISH W/ 1.30" CHISEL BIT ( total jarring time on fish 4 hrs). ***CONT, ON 11/18/2022*** RAN 3" LONG .62 PRONG W/ 1.90" GUIDE, JAR DOWN ON WRP @ 9531' SLM FOR 45 MINS, NO MOVEMENT Daily Report of Well Operations PBU 06-22B 11/18/2022 ***CONT, FROM 11/17/2022*** JARRED ON FISH @ 9531' SLM W/ CHISELS AND STAR BITS. ( total jarring 8 hrs no downward movment). RAN 1.75" MAGNET TO TOP OF FISH @ 9531' SLM ( recovered 5 more pieces of metal largest being a 1" piece of grapple). ***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED OF STATUS*** 11/19/2022 ATTEMPT PER WSS. REVISION TO COME. STEPS FOR PERFORATING & SET CIBP PUT ON PENDING 9/24/2023 PENDING WBL STEPS DELETED PER LAU - WILL NOT BE PROGRESSING THIS WORK AT THIS TIME. JARRED ON FISH @ 9531' SLM W/ CHISELS AND STAR BITS. ( total jarring 8 hrs@ no downward movment) Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:212-186 6.50-029-20806-02-00 PRUDHOE BAY, PRUDHOE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 11170 10884 9042 7397, 9471, 9615 None 10884 6439, 8076, 8212 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 79 20" 26 - 105 26 - 105 1490 470 Surface 2482 13-3/8" 26 - 2508 26 - 2508 5380 2670 Intermediate 9273 9-5/8" 24 - 9297 24 - 7914 6870 4760 Scab Liner 6739 7" 2348 - 9087 2348 - 6517 7240 / 8160 5410 / 7020 Liner 1139 7" 9117 - 10256 7753 - 8828 7240 5410 Perforation Depth: Measured depth: 10465 - 11155 feet True vertical depth:8997 - 9039 feet Tubing (size, grade, measured and true vertical depth)3-1/2" 9.2# L-80 22 - 9681 22 - 8275 Packers and SSSV (type, measured and true vertical depth) Liner 1671 2-3/8" 9489 - 11170 8092 - 9039 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 8470452244 105127513 0 26010 288 903 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Thompson, Ryan RYAN.THOMPSON@bp.com Authorized Name:Thompson, Ryan Authorized Title: Authorized Signature with Date:Contact Phone:+1 907 564 4535 Treatment descriptions including volumes used and final pressure: 13. Interventions Petroleum Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9039 Sundry Number or N/A if C.O. Exempt: N/A 4-1/2" Baker Premier Packer Junk Packer Printed and Electronic Fracture Stimulation Data 55 Operations shutdown Change Approved Program Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 5Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 0028311 PBU 06-22B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 7397 64394-1/2" Baker Premier Packer 9471 8076 %DNHU6$%/3DFNHU Ryan Thompson Digitally signed by Ryan Thompson Date: 2020.04.25 10:09:31 -08'00' By Samantha Carlisle at 8:10 am, Apr 27, 2020 ACTIVITYDATE SUMMARY 3/25/2020 ***WELL SHUT IN ON ARRIVAL*** MIRU E-LINE PERFORATE 10540'-10560' WITH 1.56" GUNS W/PERFECTA CHARGES, 6SPF 60PHASE, CCL TO TOP SHOT 9.25', CCL STOP DEPTH 10530.75' STANDBY FOR WIND ***JOB CONTINUES ON 26MAR20 WSR*** 3/26/2020 ***JOB CONTINUES FROM 25MAR20 WSR*** CONTINUE STANDING BY FOR HIGH WINDS PERFORATE 10465-10485, WITH 1.56" 6SPF 60PHASE HSC W/PERFECTA CHARGES, CCL TO TOP SHOT 9.3', CCL STOP @ 10455.7' CORRELATED TO SCHLUMBERGER MEMORY COMPENSATED NEUTRON LOG DATED 9 FEBRUARY 2013. ***WELL LEFT SHUT-IN ON DEPARTURE*** Daily Report of Well Operations PBU 06-22B Date: 4/17/2020 Transmittal Number: 93747_06-22B BPXA WELL DATA TRANSMITTAL Subsurface Information Management 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 Digital zip files for the well log packages listed below are being provided to you via SharePoint. If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendall@bp.com. SW Name Log Date Company Description Format 06-22B 1/23/2020 Baker Hughes Reservoir Performance Monitor – PNC3D & Carbon/Oxygen Zip File Please Sign and Return one copy of this transmittal to GANCPDC@bp365.onmicrosoft.com Thank you, Mer Merion Kendall SIM Specialist ----------------------------------------------------------------------------------------------- BP Exploration Alaska|900 E. Benson Blvd.|Room: 716B|Anchorage, AK ----------------------------------------------------------------------------------------------- Received by the AOGCC on 04/17/2020 PTD: E-Set: 2121860 32688 STATE OF ALASKA 1.. ,KA OIL AND GAS CONSERVATION COME. SON REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon L] Plug Perforations LI Fracture Stimulate LI Pull Tubing U Operations shutdown ❑ Performed Suspend ❑ Perforate D Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Rednll ❑ Perforate New Pod❑ Repair Well ❑ Re-enter Susp Well ❑ Other El 2 Operator 4 Well Class Before Work 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Development 0 Exploratory❑ 212-186-0 3 Address P O Box 196612 Stratigraphic El Service El 6 API Number Anchorage,AK 99519-6612 50-029-20806-02-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028311 PBU 06-22B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071) 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 11170 feet Plugs measured 10884 feet RECEIVED true vertical 9039 28 feet Junk measured None feet .!UN032015 Effective Depth measured 10884 feet Packer measured See Attachment feet true vertical 9042 39 feet true vertical See Attachment feet ©C7((� Casing Length Size MD TVD Burst Collapse v VV Structural None None None None None None Conductor 72 74 20"91 5#H-40 26 31-99 05 26 31-99 05 1490 470 Surface 2487 95 13-3/8"72#L-80 25 81-2513 76 25 81-2513 76 4930 2670 Intermediate 9273 14 9-5/8"47#L-80 23 86-9297 23 86-7914 39 6870 4760 Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10600-10630 feet 10630-10660 feet 10660-10690 feet 10690-10720 feet 10720-10750 feet 10750-10780 feet 10825-10845 feet 10845-10870 feet 10900-11155 feet True Vertical depth 9044 35-9046 12 feet 9046 12-9046 2 feet 9046 2-9046.06 feet 9046 06-9045 29 feet 9045 29-9043 56 feet 9043 56-9042 5 feet 9042 13-9042 23 feet 9042 23-9042 37 feet 9042 35-9039 38 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summaryp��® U i I 1 2.015 Intervals treated(measured) S9i Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 99 6345 0 300 255 Subsequent to operation 336 11280 1708 1100 301 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run ❑ Exploratory El Development E Service ❑ Stratigraphic ❑ Daily Report of Well Operations 0 16 Well Status after work Oil D Gas El WDSPL El Printed and Electronic Fracture Stimulation Data ❑ GSTOR El WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Garry Catron Email Garry.Catron@BP Corn Printed Name Garry Catron Title PDC PE Signature .M/ ,, _ , �, — Phone 564-4424 Date 6/3/2015 vrr- x/9 9 i 5 RBDMS- u JUN - 5 2015 , e 19/ ----- ,47,47'. - Form 10-404 Revised 10/2012 Submit Original Only Packers and SSV's Attachment ADL0028311 SW Name Type MD TVD Depscription 06-22B PACKER 2348.56 2348.56 7" Baker ZXP Packer 06-22B PACKER 7397.32 6438.9 4-1/2" Baker Premier Packer 06-22B PACKER 9119.55 7755.07 7"TIW Liner Top PKR 06-22B PACKER 9471.9 8076.33 4-1/2" Baker Premier Packer 06-22B PACKER 9615.8 8212.44 3-1/2" Baker SABL-3 Packer w coCL OD O O N O OD 0- o O l(j O lM O lM lfj C) 1- 0• 0) � � � � CD CD 000) OMCC0 CD Q0 CD Tr a0 N '- N N '- N 0) O Nr O 0 0 m CO N- OD N- T- T- 4 0 00 T- T- CD O M 0) I- r- OD CO V VD V- 1.0 T- 14/ LO M LO N CD rf N N- Tr N CO op M T' O 4 O O 6 0 M u O CO O ui 0) T- N N N T- M M M Tr N- OD OD N- 0) 0) Ul 0- OD T- O 0 L Tr Tr O O - N N- CO N- OD OD 0) 0) N CO O 00 OD OD OD COcr 0) 0- T- Tr CO CO — CO M 0- M CD Tr T- M 4 N CD OD N0 a0 03 (g) O 0) O cD co CO M T ,r O T- M tf) M T N- OD CO CV OD a0ao0) NCO N COaTr 0oO0oao 4.11 f� OO O OD O N o0 N- M N N 0) 0) OD ' O O 0) O CD OD OD OD 0) N O NU Y- T M Tr Tr Tr up CD 0) N- O 0) c) 0) w— N N- N- 0) 0) 0) 0) CI 03 r Qr 0) 0) 0) OD ", N OD N- M 0 M CDvvoT- rnCD -- CO - 0) OCDaoN- liAJ N N 01 N ti 0) Off) CD )) N N ti N- 00)) 00)) 00)) N C O 1— < ]: o0 o920o0a° oa° o0 Q T0° 0 a0? ( ao ao U OD U OD OD J 0 0 0 J M -11 T- N �? *k *k *k • 4 N • CV N N M •� in N al N N a) a) N 0) N 0cn - oD - 00 <V (V EN CV U O 01 I- r` ti co co N N CV C.' i (NO) N M N M T M T M M N 4 t ✓ 01 VD CD N OD T CD CO M N- CO ti Tr O 4 O a0 N- CD LU CD 0) N C N- N t!7 •- - CO N OD 0 N- 0) ) 0) CC) - - - N N- N W < C • W col U V p ce ccn a c c c u. Z Z Z Z Z Z Z W W W W W W W W m co m pp co m Q H Z Z Z Z Z Z p o p p 0D D U Z J J J J J J U0F- F- F- F- F- f $ CO _ _ -r.) e \ ƒ \ / c 3 \ G # ƒ \ / L) \ § / m $ 7 = \ \ e s ® f2 /kf / \\ / E \ R \ b15 ai W00 �� 00_ a CO \ / / k / �kk e± _ _ _ I2 5 % m - o f \ I I % LO$ § I % / / \ ± 1.112 2 7 / / o eL/ E a_ 2 \ R f 2 & e , ■ O = > o ® R = ° ' e / o / $ 7 \ - - \ \ / / / \ E E o / 6 o E 1 I I o k o / 2 \ m / © ', 6 - \ o % £ ƒ / / ; ƒ / • \ / ƒ I » O. \ e / qpp G@oma : \ ° ® O 2 0 ¥ ! EG % ® co » __ 7 o / 2 ?/ Co 0 (1) e / \ t 2 / E W oo m [ co @ # R e n E / R ri E q _ = o s [ ± o = w & m * , _ E o U o O U o k # I R o 2 0 \ > / / / ( \ C Cr - \ / \ t 0 \ 9 / \ Q £ k ° C o © $ _ oa « c_ a . - aia = = Rw � w � . _ _ �� 2 = _ .- O o • a ¥ ,_ m tCD / 2 CD � J ƒ % �/ �� 2 -0 CD \ $ ± / \ -® d IX / O > G ° F\ C ° i r o ° 5 2 ± 2 ± / \ f 5 c/ / 0 ® + 6 » / 2 E '� a « O Cr)o o k.E k ® o . ® ± 6 6 = o + - S + « # ® § o - a — o s g A a e R B m o e o 2 CO 0 o G \ 2 R G o = o b / G G / % it e / « aG OoegIG / * eg = £ a 3 - 9 / - & a ® a E w / I co w $ ° 0 ƒ \ 0 o = 2 0 r ,_ = J 2 2 ® E E o -1 = 0 a \ 4 » ± / 0 4 A 7 / • 0 \ I Q o _c G $ & CO w U CO a E = .§ c 2 = b b ® c E m G " � ® � ® sop= # U % eo = # . 2 = ee � o 2 \ \ / - / // / / \ / / / \ £ * \ f / \ G m G i U I : 0 (02 , , t (_) (33 : Z O % r I- .0 e e in n n \ d \ d CN \ a 0 c / CO w ¥ c a I Co CNN N 9 9 # # -4- # -4- TREE.= * £M/ SA' NOTES: W ELL ANGLE>70°@ ,WELLHEAD= FMC 06-22B 1054.. ."**CHROME TBG&LNR*** ACTUATOR= BAKER C MAL KB.ELE 74' /) I BF.ELEV= 20"CONDUCTOR, H 79' KOP= 2640' 91.5#,H-40 ' 211T -13-1/2"HES X NP,D=2.813" Max Angle= 94'©10720' D=19.124" Datum MD= 10293' - '22348" H 9-5/8"X7"BKR C-2 ZXP LTP,ID=6.290" Datum TVD= 8800'SS 2365' H9-5/8"X 7"BKR FLEXLOCK HGR,D=6.350" TOP OF 7"SCAB LNR -1 2348' I 4.1 ; GAS LFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80,D=12.347" - 2519' vi4 , 3 3230 3217 19 MMG DOME RK 16 02/18/13 .� MI I 2 5583 5113 38 MMG SO RK 20 02/18/13 4. 1 7302 6373 46 MMG DMY RK 0 05/12/08 Minimum ID = 1.81" @9489' 1* * 7377 H3-1/2"HES X NP,D=2.813" 3-1/2" KB LINER TOP PACKER �. ** • 7392 -1 3-1/r x 4-112"X0,13=2.960" 7397' H 7"X 4-1/2"BKR PREME3R PKR D=3.875" �'l/ 1� ; - 7407' H4-1/2"X 3-1/T xo,D=2.960"7"SCAB LNR,26#,L-80 BTC-M, H 7506' 4�1 7439' -i3-1/2"FfS X NP,13=2.813" .0383 bpf,D=6.276' 1.4 441 r 8BJ OWCSG PATCH w!SEALS,0=6.276" H 7506'-7510' 0 ' 908T HTNV TYPE LG SEAL ASSY,D=6.200' 7"LNR,29#,L-80 NSCC,.0371 bpf,D=6.184" H 908W 9118' 19-5/8"X 7"TNN LTP w/TTW LNR HGR& T1E$ACK SLV,D=6.18" TOP OF 7"LNR H 9117' MLLOUT I NDOW(06-22A) 9297'-9347' 9-5/8"CSG,47#,L-80 BTC,D=8.681" H 929T 9466' -13-1/2"X 4-1/7 XO,D=2.960" 09471' -17-1/2"X 4-1/2"BKR RREME R PKR,D=3.875" JJJ- 94$3' H4-1/2"X 3-1/2"XO,D=2.960• 9489' H3-1/2'KB Lw,D=1.81"(02118!13) TOP OF 2-3/8'LNR H 9499' 9499' --12.70"DEPLOY Sly,D=2.25" 3-1/2"TBG,9.2#,13CR 80 VAM TOP, H 9566' j 9505' -12-3/8'PUP JOINT,D=1.920' .0087 bpf,ID=2.992" r;......- 3-1/2"TBG STUB(05/06/08) -{ 9569' 9514' -13-1/2"HES X NP,D=2.813" 9581' _H7-1/2"X 3-1/7 UNIQUE OVERSHOT BEHIND EST TOC(TAGGED 01127/13) --.1 963$' CT LNR 9591' 3-1/2"PARKER SINS NP,0=2.813" 3-1/T TBG-PC,9.3#,L-80 TDS,_0087 bpf,D=2.99T --1 9681' i 9615' H7-1/2'X 3-1/2"BKR SABL-3 PKR,ID=3.87" S�if1AARY ? 9652' -13-1/2•PARKER SWS NP,D=2.813" PERFORATION REF LOG:SLB MCN_ON 02/09/13 ` 9669' 3-1/2"PARKER SWN NP, BEHIND ANGLE AT TOP PERF:84°@ 10600' �� ! MILLED TO 2.80"(01/27/13) CT LNR Note:Refer to Production 08 for historical pert data 9681' -13-1/2"WLEG,D=2.992" SIZE SPF INTERVAL Opn/Sqz SHOT SQZ ► fvi 1.56" 6 10600-10690 0 04/29/15 .4. Ar ' 1.56" 6 10690-10780 0 08/22/14 4 4, * MIL LOUT WNDOW(06-22B) 10256'-10262' 1.56" 6 10825-10870 0 06/03/14 v:i•,v.i:. 10425' CALCULATED TOC 2-3/8"LNR 1.56" 6 10900-11155 C 02/10/13 v °`► '� (02/08/13) 3-1/2"MONOBORE WHPSTOCK(01/30/13) --I 10256' +•> �` ....:!';‘,.'4.:-:."4:" •a„,b ,� 10884' 12-318"CEP 414".1/4 L MARKER Jwvr j-L 10266' *"1.:44::::.:',-:; '0'e.'.•,�,�I 1111,'N' (06/02/14) PBTD - 10600' : FBTD H 11159' Rte`'_. a 7"LNR 29#,L-80 NSCC,.0371 f,D=6.184" -1 10681' ','::::!*..!...k. 4.�s.4.. .' -.{ 4'.1'..11'4 bpf, �.�.�.�_�. 2-3/8'LNR 4.7#,13-CR STL,.0039 bpf,D=1.995" 11170' DATE REV BY COMMENTS DATE REV BY COM?&TTS P RUDHOE BAY UNIT 09/30/82 ROW 26 INITIAL COMPLETION 06/04/14 JTCJJMD CIBRADPERFS(06/02-03/14) WELL: 06-22B 11/05/93 D16 SIDETRACK(06-22A) 08/22/14 JTCJJMD ADPERFS(08/22/14) PERMT No: `2121860 05/13/08 D16 RWO 05/05/15 ATO/JMD ADPERFS(04/29/15) AR No: 50-029-20806-02 02/11/13 NORDIC 7 CTD SIDETRACK(06-22B) SEC 2,T1ON,R14E,584'FSL&985 FEL 02/15/13 ?/JMD DRLG DRAFT CORRECTIONS 02/20/13 RP/PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) L9.V6 ip - ° w a) (JLr r r r r r C (J 7wmoo0 0'-'•W J V1 CD Q19 O2Cv., D z CU O LU - L) > • as a (UOO • r L C • 1- > Y O r° CL v y � � � CO C O 5 a Q � O '� O rD cd > 0 Q J r r r r L O � '�,, J a . . r }� O V1 In O a a m a A ,� a s ,a s c c -1 a a , a E 2 a a E Q v o 6 o r Z a M N O M 0 N > O — a al o -C• E o > a) a) U Y L • 41 r0 D ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ a v U W } W W W W W W W W W pip C ra O CO . . - u.. LL U. LL LL lL LL LL LL tn a E -0 N O Q J J J J J J J J J Q 0 C v CO F Q Q Q Q Q Q Q Q Q c 0 C) 04 Z Z Z Z Z Z Z Z Z a) rra v GI u LL LL LL LL LL LL LL LL LL Q) _C - uQl 8K v- ToU > _, O -+ C — O v E a; a O O L) , a v -p _ U I. O E 0 _0 C v a� v O 52 a H > > c Uc U �- J J I- Q Q1 .1= Ou Q>1 L01 o av� LL m r- rmin a. a. c. O aOOOO22U Q1 4a� o a �a 2 LL U U 2 d Q O F a X 2 x Cr) Cr) 2 Ey 0, U 0 W Wn > U J I a) �Ai W 0 0 at - a 1 ° " = 'FIz U.) odce r >- > o�1 (a V — J J J O J J O O J W� `7 W U W W 4 41 LLJ d > > >, > > >, >. 2. z .• m m m m m m m I Z j 2 0 0 0 O O O O E ® co m L L L L L L L ('-� W C 7 7 7 7 7 7 7a) U N LL J Ian a LL CL CL LL tl 0_ Q_ p O _ tai) a f'V d` Cr X in p _� j W CO M 0 CD CO N V O 0 0 0 NN N 0 0 N O CO 0 V W `° 0 0 0 0 0 O 0 r0 O 0 0 0 0 0 0 0 0 0ro U >- L.: 7z c a ci z a c:v zoo 'E 'V' N V N > Cn } I W CC Lu ❑ O D 0 U U U U (11 0 O O O N O 0 N ,i• -• 0 V O 0 0 0 0 O O O Oin N CO G O O N W t0 0) M C `t to E nil It O O ID N N CO U) '4) •- O N CO N N _ 0 0 0 M N ENNNNN NNNN N Q... OQ) 0) O) O) O) O) 8) (3) p O N N N N N N N N N Q1 O O O O O O O O O _ OO O O O O O O O r1) )!) )!) N II) to N )n 1C)Com CO c a+ p ) d1 M G U C Era g QE cu u CO W .-' Y O cc U a 1� O CO M CO N N m Q Ncsi (0 a) 4J it W M O ry r w E H. N CO M N r N r [Z RCI d Q N J 0, O (e:, .L4. n. E Z d rt:. p COD E1dR COro o V a a Q Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. cz_01 - j.. Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RE CAN: OVERSIZED: NOTES: C or Items: ❑/Maps: Grayscale Items: /Logs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Maria Date: Nig. /s/ Villf Project Proofing BY: Maria Date: r q ` /s/ Scanning Preparation a x 30 = (0d + c77 � = TOTAL PAGES LV ' (Count does not include cover sheet) BY: Maria Date: q /s/ Production Scanning lig Stage 1 Page Count from Scanned File: IP (Count does include cover sheet) q Page Count Matches Number in Scanning Preparation: YES NO BY: 4110 Date: /L /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc O l N 1 Z ` Z' 0 W W W JI JI j 9 0 0E E o1 LL LL LL Q Q Q `c O w JI JI JI Z Z Z `v., 0 CO Z c ~Q Q Q LL LL it N Z Z Z I I I to coco at cn 0 U y 2 J .3 0_ LI LI LLI co U) Cl) Q 5 i }I c c M 0 0 0 0 0 0 2 2 (.6p T I 0 j j O OI MI MI MI MI MI MI O -1 j Z Z NZ N N N N NZ > U U m W m m m m CO m_ fa J Ca N ''W1)LLI LL LL I.L LL LL LL Q , C (a C 0 C LLQ O O O O O 0 o M_ p.U p.._ Z I 1 I 1 I I ul U m m — (O 0) (p (a O N O N 0 V) E O N Is y 0 LL Eo� ov 0 10 ocl)c moo_' a> O( Oc E OCL E oR`- U p o c N 'a O 0- O o -0- ai I ai 1 ai 1 ai I ai 1 m ai I- Z r d n a Z Z li EE 0 a) O Z EE 'c c w (� 'c o 'c w o. 'c w c c y o,L r o Z a) a o[o� o o]= o m= o m- o CO 1 o m 1 o co 1 ) o U' c c �~ ao d2 d2 a= d0 LLD LLD I— JJ Im _CO Ow DU' pp 030_ a>mml 2:12mm1 a�mm1 Nm W aim W Nm W Q EO z z J z + WNW W N O W N O W N 0 W N LL W N LL W N it O Z o w _ _ _ _ O c 'O cocococoM co co co co co co //�� O I, 0 0 0 0 0 0 0 1.1.E Y > O O O O N N N N N N N W w •y N N N N I. I,- h R. n r. I-- CC C.1 e CO CO Ce 0 M CO el M (O (O CO O (D (O (O a LLI g X c c c c o m /O I O U'O O O O Z ° — ala 0 N. Q a) co O en- N- a to co J ao a(0 CLz / o c o 0 o a,G O / Z .a N O co co co E0 y y u) w 00 00 O • fl a a> to E a ✓ U m c cn c .J N IY Z 0 < N P. O M J a1 V ` o z J U N / . al cc 5 CO m N � U JNA N O a) co i O 0 , c�ch Q re cc Q Li Z / Z°I lkC7 E o 0 d U o 0 a s coEv g > > Z o - U = 1 g as as co m m m m o o d c m m m m m m m M I % C E o 0 0 0 0 0 0 0 0 0 0 �rn it cc Zig v m �a m _ ._ ._ La _ D Z G y ` D O Z z 0 0 0 a 0 0 0 0 t O - Im O O v 03 a, ao ao ao ao 60 N I. Q I Z . C N 0 7 co co CO N N N Nre 2 Q O ,Q W 0 Z Q Q o le LL V € E U 0 O 0 O v c 2 Q a o W LL al 0 La U I ' z W J 2 0 0 0 0 0 0 0 0 0 u Q H C a 2 cca) 01III i G FT J G H W c J W W W 0W W - W 0 W Q 7 0 I M N CO CO9 CV CO co J J J ON 9 W 01 01 01 W W W 0o CO p W_ W_ W_ Jeq I JI JI n i N Z d wI WI WI WI Z Z Z J : O o O) 0 co F— Q Q Q LL LL LL coN a d N 5 I N U Z Z Z UI UIu)I N O O N , O 0 CO a LL it W to co u) o a) ani LL a) I 1 1 0 5 c p Z • U 2I 2I �1 I I I Z N aa)) WW (/) Z ca I M M M cnM co Z 2 a Q y_1 0 0 0 0 0 0 Q CO CO a a a mw m m m m m m CO m m m m W -w W W W w w w W N N N N CO CO CO CO J 2(n U• QI 00 00 O0 00 00• a) 00 I 0 0 0 0 0 N N 0 Z O D m Z a) yI a) yI a) N1 a) co a) u, E a) WI p a) a) a) a) N —_ a0 0 �� �� E �� - W E 2W E YWr- a(n u v y cr10 Ow I IE I Irn la) Iv • 0 w 'E3= 'Ect *Ew EW EWL) 'Ece v Ecea o E 'E 'E E E co m 1a0o2 EJm E0 E ECS E 204- 20= 20= OCA �o 2 0 2 2 E -.I co j O a)NIDI d coI m• a)N m a)NI_a a)NI ml a)NI• ml a)NI mI N w a) a) a) a) V IX Q NJ W NO WN2 WN2 WN2 W N0 W ND W N0 N2 W W W W O Z �, Q 0 M_ _M M M M M _M M _M _M M_ a d E CL F O O O O O O O O O O O E (A E W �¢S N Ln N in NLn N up N Lo N up N 11) N N N N y Z coCe 0 c0 00 c0 co W co M M co M a W w J a) U m 0 d Z `o o a) Qir N O r O J 0. f- a • in I c lM OE 0Lo 0 N G N 0) Oa co E U O M U o —.I m N N - N a co l''"' o 0. O r z M _ co O 10 C N W CO N c 1 CO0 a) V/ 0 co D Q ao 5 < 0 Z O I as U c c Z (E co co J) U) a) a) LO f0 co co m N 03 a) a) a) d i U CO CO CO CO CO CO (0 -0 CO (0 (0 CO 3 M a) 0 0 0 0 0 0 0 ami 0 0 0 0 , - I 0 I CO co CO CO co co co I co (0 CO (0 ' o co 0 'p) pL 'p) 'p) 'cm 'ca 'pL C) 'p) 'pL 'p) 'p) <p 0 D J 0 0 0 0 0 0 0 _1 0 0 0 0 ; E p c0 > co co co co co i w W co I- V U) (C) )f) )f) It) U) t() If) N N N N C > N CONM CO M M M M M M CO M CO CO w ✓ N N N N N N N N N NNNN N W N ). a) et E E Z •= O COin (o 0 p 1 y z IP U 0 0 0 0 0 0 0 U U 841 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 y I 0 d 0. 2 '1J W W W W W W W J W W W W i3 — o `" O 0 N m /Q Z Z Z cv O p t` y O Z } >- } bo N N % Q co U N N N N Q o T 0 o C C ci N O Z r L O It a U a m 1 Q d m a 1 U U J I UO Z Q v /Z co is } } } CO.... � J N N Q LI a0 O z • Tom iii CL � U Q 0 I LI OJ m m a i.;= E W X N - N N N U w J N m a O. • o _ 3 E ZI) Q s O N Cl) _m N J a c I J a • = E O. O 2 0 0 0C 2 � N p 1 � N Ja rn Z C w CO } >- >- I E ° J ma Q <V CV / O / O 0ao 4- f.o U o I"'_ ~ o 5 ▪ o �° ,I GN C CO CO ,; 1I :O i. Q liCC Q-' C - N 1 MIIn"' o 2 as 0 IS as z Imo. d M N �` • Q) O O (h Z fV N .mss O O a O) _ N ›- ›- ›- N Q/ O E`o o co 3 N N O = iU N _ a w C o) H m 0 0 d c y 0 • c Z c 0 0 iii o p o o Q o 0 ++ c C �U` a+ r U J .� N • G N 10 V S2 7 -6) a a m `.) E a E E o o 2 E a) U) E E d d 0 d (9 0 0 c 0 0 0 RECED STATE OF ALASKA AL A OIL AND GAS CONSERVATION COMMI )N SEP 1 7 2014 • REPORT OF SUNDRY WELL OPERATIONS AOGCC1 Operations Abandon U Repair Well LJ Plug Perforations H Perforate U Other j Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extensions Change Approved Program ❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2 Operator 4 Well Class Before Work 5 Permit to DnII Number. Name BP Exploration(Alaska),Inc Development Exploratory ❑ 212-186-0 3 Address P 0 Box 196612 Stratigraph+c❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-20806-02-00 7 Property Designation(Lease Number). 8.Well Name and Number ADL0028311 PBU 06-22B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071) 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary Total Depth measured 11170 feet Plugs measured 10884 feet true vertical 9039 28 feet Junk measured None feet Effective Depth measured 10884 feet Packer measured See Attachment feet true vertical 9042.39 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 78 20"91 5#H-40 21-99 21 -99 1490 470 Surface 2488 13-3/8"72#L-80 20-2508 20-2508 4930 2670 Intermediate 9278 9-5/8"47#L-80 19-9297 19-7914 39 6870 4760 Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10690-10720 feet 10720-10750 feet 10750-10780 feet 10825-10845 feet 10845-10870 feet 10900-11155 feet True Vertical depth 9046 06-9045 29 feet 9045 29-9043 56 feet 9043 56-9042 5 feet 9042.13-9042.23 feet 9042 23-9042 37 feet 9042 35-9039 38 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) Treatment descnptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 36 9482 0 -15 258 - Subsequent to operation. 1242 2688 45 -15 374 14.Attachments 15 Well Class after work Copies of Logs and Surveys Run Exploratory Development❑Q Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil U Gas LJ WDSPLJJ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUGS 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Nita Summerhays Email NIta.Summerhays[a�bp.com Printed Name Nita Summer ays/ Title Petrotechnical Data Engineer Ar/ Signatu_„,.„� //%117j.<<i�- Phone 564-4035 Date 9/15/2014 RBDMS SEP 18 20,' vL 9 /z - / It Form 10-404 Revised 10/2012 .?.'. -f4 Submit Original Only Daily Report of Well Operations ADL0028311 ACTIVITYDATE I SUMMARY CTU 8 w/ 1.5"CT. Scope;Adperf Rig up. Function test BOPs. RIH w/BHA; 1.5"ctc,dfcv,disco, two 1.75"stingers, 1.75" nozzle (oal= 10.85') 8/20/2014 **Job continued on WSR 08-21-14** CTU 8 w/ 1.5" CT. Scope;Adperf RU PDS mem gr/ccl. RIH to TD flag, PUH and paint blue on white flag at 10799.8'. Log up to 10,400 at 45fpm. (-11ft correction). RU SLB 30'x1.56" TCP guns Perforate 10750- 10780. POOH. LD spent guns. MU 30' of 1.56" SLB guns (OAL: 37.86' MOD: 1.69"). RIH 8/21/2014 ***Job in Progress*** CTU 8 w/ 1.5" CT. Scope;Adperf RIH w/30' of 1.56" SLB guns(OAL: 37.86' MOD: 1.69"). Correct depth @ flag to 10684.54' (TOP SHOT). Circulate 1/2"aluminum ball to seat w/ 1% KCL+ Safelube. Perforate 10720' to 10750'w/SLB 1.56" 1606 PJ guns (6 SPF, 60 deg phz). POOH. LD spent guns and recoved ball. MU 30' of 1.56" SLB guns (OAL: 37.86' MOD: 1.69"). RIH Correct depth @ flag to 10684.54' (TOP SHOT). Circulate 1/2"aluminum ball to seat w/ 1% KCL + Safelube. Perforate 10690-10720. POOH LD spent guns/recover 1/2" ball. RDMO 8/22/2014 ***Job Complete*** FLUIDS PUMPED BBLS 61 50/50 METH 125.4 1% SLICK KCL W/SAFELUBE 186.4 TOTAL O CO O O 0 0 0 0 — � co vvA- A- A000 O Azt LO LO O o N0 0 0 0 o 0 0rn o 0 0 0 0 h. • cc N N N 0 0 m r Cfl N- O) CO CO - CO N co M N N pp M N- V O Lc) N I� CO O) CO 0) 6) CO CO Ci I I 1 1 1 1 1 1 I I-- CS) CO M I� N V 6) N (O M O ai N O - M N N CO i•� co co o) cc N- O co O O co - - O) O c L O C o co O N Ln Cfl LO If) CO .c O) 6) N 6) 6) T i i i i — T Q IC) 00 6) OO O O O CO W O O (.0 �) (V N co LO N N Lf) O N C)) CT) O) 6) �• J o CD Q p 0 O o0 0 0 ao 0 CO 0000 °D000 U °0 = J cc 00 J co J J co J •N a) J J r N CO co c _ CO CO N V - N U O � NN00 `rcc -- N OIn M M M N NO) N M N co N M +-' co Lf) M N co O N C cocm N V � O CO NNd' LO CD O LP) '- '- N O) J 0 0 tnD2 UUCP R o cCcc ctcc cc cc u_ Z Z U Z W W W W W W m OHZZZZZJDD U z J J J J J (n , Packers and SSV's Attachment ADL0028311 SW Name Type MD TVD Depscription 06-22B PACKER 2348 2348 7" Baker ZXP Packer 06-22B PACKER 7397 6438.68 4-1/2" Baker SABL-3 Packer 06-22B PACKER 9126 7760.76 7" TIW Liner Top PKR 06-22B PACKER 9471 8075.49 4-1/2" Baker SABL-3 Packer 06-22B PACKER 9615 8211.67 3-1/2" Baker SABL-3 Packer TTEE_ • OW SAFE- "TES: WELL ANGLE>70°ia WELLHEAD= FhC 06-22B 10541_ CHROME TBG&LNR*** ACTUATOR= BAKER C NTIAL KB.B_E - 74' �I 1 'BE ELEV= 20"CONDUCTOR, H 79' KOP= 2600' 91.5#,1+40 ' 2117' -13-1/2"1-ES X NP,D=2.813" Max Angie= 94'0 10720' D=19.124" Datum MD= 10293' 2348' --9-5/8"X 7"BKR C-2 ZXP LTP,D=6.2A" Datum TVD= 8800'SS / r 1 2365' -19-5/8"X 7"BKR FLEXLOCK HGR,D=6.350" TOP OF 7"SCAB LNR H2348' �•I .. GAS LFT MANDRELS • I ST NO ?VD DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80,D=12.347" - 2519' 1 . , 3 3230 3217 19 MMG DONE RK 16 02/18/13 *1 * 2 5583 5113 38 MMG SO RK 20 02/18/13 04� 1 7302 6373 46 ., MMG DMY RK 0 05/12/08 Minimum ID = 1.81" @ 9489' �� �_ 44 , ' 7372' H 3-1/2"HES X NP,D=2.813" 3-1/2" KB LINER TOP PACKER 044 o*', .• 7392' -3-1/2"X 4-1/2"XO,ID=2.960" 41 4 739T --I 7"X 4-1/2"BKR FRBVE R PKR,.0=3.875" ..1@ 171 ,.♦, • 7407' -14-1/2"X 3-1/2"XO,D=2.960" r SCAB LNR,26#,L-80 BTC-M, H 7506' *1 • , ' 7439' -13-1/7 HES X NP,D=2.813' .0383 bpf,D=6.276" .1 ♦1 • 7 BOWEN CSG PATCH w/SEALS,D=6.276" H 7506'-7510' �•�, 908T H TNV N PE LG SEAL ASSY,D=6.200' 7'LNR 29#,L-80 NSCC .0371 bpf,D=6.184" H 9086' r 9118' -9-5/8"X 7'TNV LTP w MVV LNR HGR& TIEBACK SLV,D=6.18" TOP OF 7"LNR --I 9117' I ►�1 MLLOUT WIDOW(06-22A) 9297'-9347' 9-5/8"CSG,47#,L-80 BTC,D=8.681' H 929T 9466' H3-1/2'X 4-1/2"XO,D=2.960" 09471' H7-1/2'X 4-1/2"BKR FREMER PKR,D=3.875' �----1 9483' -14-1/2"X 3-1/2'XO,D=2.960" 'i 948W � )3-1/2'K8 LTP,D=1.81"(02!18/13 TOP OF 2-3/8'LNR 9499' 9499' -12.70"DEPLOY SLV,ID=2.25" 3-1/2"TBG,9.2#,13CR 80 VAM TOP, H 9566' 9505' --12-318°RP JOINT,D=1.920" .0087 bpf,D=2.992" 3-1/2"TBG STUB(05/06/08) j{ 9569' , 9514' -i3-1/2"ISS X NP,D=2.813" 9581' -17-1/2"X 3-1/2"UNIQUE OVERSHOT BEHIND EST TOC(TAGGED 01/27/13) H _ 9638' CT LNR 9591' --3-1/2"PARKER SWS NP,D=2.813" 3-1/2'TBG-PC,9.3#,L-80 TDS,.0087 bpf,D=2.992' 9681' K 6615' -17-1/2"X 3-1/2"BKR SABL-3 PKR,D=3.87' � �, .' 9652' -13-1/2"PARKER SWS NP,D=2.813' PERFORATIONREF LOG:SLB hCtt.ON 02/09/13 i M 9669' -3-1/2"PARKER SWN NP, ANGLEAT TOP PERF:91°@ 10690' '2 S MLLE)TO 2.80'(01/27/13) CT LNR Nate:Refer to Production OB for historical perf data 0'4SIZE SPF t.11U IAL Opn/Sgz SHOT SOZ %% 98$1 -{3 1/2"WLEG,D=2.992" t 1.56" 6 10690-10780 0 08/22/14 i. 1.56" 6 10825-10870 0 06/03/14 N. MLLOUT WINDOW(06-228) 10256'-10262' 1.56' 6 10900-11155 C 02/10/13 Lit.P10425' -CALCULATED TOC 2-3/8"LNR le '` • (02/08/13) 3-1/2"MONOBORE WFIPSTOCK(01/30/13) -{ 10256' ••It•10..� .�, `'�` .or ,f4or Vt� ! �i a� 10884' -2-3/8'CBP 7"MARKER JOINT H 10266' r�'p + ' �` �+N I-'aftsissi (06102/14) -I ll 11159' PBTD 10600' �► MID H '-�, 7"LNR,29#,L-80 NSCC,.0371 bpf,D=6.184' 10681' 2-3/8"LNR,4.7#,13-CR STL,.0039 bpf,D=1.995" - 11170' DATE REV BY COMFITS DATE REV BY COMu64rS PRUCHOE BAY UNIT 09/30/82 RDW 26 INITIAL COMPLETION 06/04/14 JTC/JMJ CBP/ADPERFS(06/02-03/14) WELL: 06-22B 11/05/93 D16 SIDETRACK(06-22A) 08/22/14 JTCIJND ADPERFS(08/22/14) R37NIT No:'2121860 05/13/08 016 RWO 08/27/14 PJC PERF CORRECTION AR Na: 50-029-20806-02 02/11/13 NORDIC 2 CTD SIDETRACK(06-228) SEC 2,T10N,R14E,584'FSL&985 FEL 02/15/13 ?/JMD DRLG DRAFT CORRECTIONS 02/20/13 RP/PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) I STATE OF ALASKA �TuCL ��e ,�ALA. OIL AND GAS CONSERVATION COMMIS; �REPORT OF SUNDRY WELL OPERATIONS V �� 082014 { 1 Operations Abandon LI Repair Weld] Plug Perforations ❑ Perforate Othert Lf ryecca_ Performed' Alter Casing❑ Pull TubinLl Stimulate-Frac ❑ Waiver Time Extensioi❑ Change Approved Program❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well 2 Operator 4 Well Class Before Work: 5 Permit to Dnll Number: BP Exploration(Alaska),Inc Name Development] Exploratory 212-186-0 3 Address: P.O Box 196612 Stratigraphi❑ Service 6.API Number: Anchorage,AK 99519-6612 50-029-20806-02-00 7 Property Designation(Lease Number): 8 Well Name and Number ADL0028311 PBU 06-22B 9.Logs(List logs and submit electronic and pnnted data per 20AAC25 071): 10.Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary. Total Depth measured 11170 feet Plugs measured 10884 feet true vertical 9039 28 feet Junk measured None feet Effective Depth measured 10884 feet Packer measured See Attachment feet true vertical 9042 39 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 78 20"91 5#H-40 21-99 21-99 1490 470 Surface 2488 13-3/8"72#L-80 20-2508 20-2508 4930 2670 Intermediate 9278 9-5/8"47#L-80 19-9297 19-7914 39 6870 4760 Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10825-10845 feet 10845-10870 feet 10900-11155 feet True Vertical depth 9042.13-9042 23 feet 9042 23-9042.37 feet 9042.35-9039 38 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary. Intervals treated(measured): Treatment descriptions including volumes used and final pressure 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 252 19153 5 -15 500 Subsequent to operation 36 9482 - 0 -15 258 14.Attachments. 15 Well Class after work Copies of Logs and Surveys Run Explorator❑ Development0 Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil E Gas ❑ WDSP❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP ❑ SPLU4 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Garry.Catron( BP.Com Pnnted Name Garry Catron Title PDC PE Signature C Phone 564-4424 Date 7/8/2014 �'� RBE MS JUL - 8 2{ , Form 10-404 Revised 10/2012 At v' ' / Submit Onginal Only Packers and SSV's Attachment ADL0028311 SW Name Type MD TVD Depscription 06-22B PACKER 2348 2348 7" Baker ZXP Packer 06-22B PACKER 7397 6438.68 4-1/2" Baker SABL-3 Packer 06-22B PACKER 9126 7760.76 7"TIW Liner Top PKR 06-22B PACKER 9471 8075.49 4-1/2" Baker SABL-3 Packer 06-22B PACKER 9615 8211.67 3-1/2" Baker SABL-3 Packer N 000Oco';oo_oo co I�'co co ch co ti CO r r- I-- ~ O C17 r r r N 0 U L rnr- v ' 0N Or) O O O ' CO 7 '1' CO N N " O r r m r CO ti r r 0 0 r r r C) r CO CO r C:0 N N- CO CO r N N a0 CO r-- a) 4 Cc) O O O) O O O r r r co co N- N- O) CC) O r O O N r N N- CO O) CO C)) C)) CO CO H r CA CO r CO N ' C) N NCf) O C co N N co I- r r O r co co o) ao . A1C C O r a0 O CD CO r r E O O r o0 O O a0 O N cfpC() C.C) (0 S. Or O r r N O C)) V < 01 Cf) CO 0) CO O rn CO r O) CO r CAO O r (D �N N r M r r N N to = O N 6) O 0) O) • C � J o 0 Q o � w � aa) (0o o o r U I U = J a) a) J co J J c i r N J J N- % N 4 M •� N 11,r C.O (c) " CV O UNN - bo 00 - O Cn N- co w ooch N N O CO N M N CO N CO -C CA co V CflO a0 OC C N- N r u) O (0 N V CC) J O) Cn r r N O w • Q CD U.c7 w < 00 zwwwwwwE: (73m O H z z z z z DD D U Z J J J J J U) H H p � b ,_ + K - in o / 5 O - \ f o 2 % 2E - U X03 © o =N- = c / C © \ / / t k _ o < ^ 5 ® % / % $ E E b / o r / G # < $ ^ 0 \ ° 39 2 § .§ ? \ka� � < ' ' z_ _ - I = I _ 17 k cc / E8 2 » * ± = �_ U . OL cc © O a)•Cua = \ \ / / � � ecg - � ° _ ■ 5» H \ § / 2 0 \ / / \ m u & 2 a & o o .$ I = # c� � = 2 \ ii 2 COo = e ± a ® 2 � ID 4.- _ as 0 - 2I0o •c \ � / / / � 0 ; - Nj°—o / / � \ \ _ 0a Z � \ , ,5 � � ER = • • -- o 660 %\ 940 a55^ e p _1 \4 / / easp� /f ¢ \ 2 t / -5 � � U0) / ¢ - NT - = 4 4= (13 = o �� Q k10 - 72 / / § 0O \ C4 C)C - C / � ,,;g / - g 4 R < b z \ < © » 'R1 > 5 2 7 2 I 0 2 t > 19 ® § / CO \ O 2 I L \ / _\ < - i 0 = 5 ± 5_w 2 0 / -J O - \ \ U \ / ° / @ /? $ / 2 4-' E a. 7 / O » 2 E '- E - z k _ _ c _ / / \ 523 " $ 3 / 3 k\ 4 = 7RO202 / \ D0tE29, 0 1- % 7 0 / / - i O E ƒ 0_ o \ / (N / e o TREE= OW SAFETY rES: W ELL ANGLE>70°@ V113_LHEAD= FMC 06-22 B 10540'. JROME TBG& LNR""" ACTUATOR= BAKER C NTIAL KB. ELE 74' /I BF H-EV- 20"CONDUCTOR -{ 79' KOP= 2600' 91.5#,H-40 ' 211T H3-1/2"FES X NIP,D=2.813" Max Angle= 94"@ 10720' D=19.124' Datum MD= 10293' 2348' H9-5/8"X 7"BKR C-2 ZXP LTP,ID=6.290" Datum TVD= 8800'SS 2 /1 ) 2365' -9-5/8"X 7"BKR FLEXLOCK HGR,D=6.350" TOP OF 7"SCAB LNR H 2348' / 14 ; GAS LET MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80,13=12.347" - 2519' 1i 1 , 3 3230 3217 19 MMG DOME RK 16 02/18/13 � mi I 1; 2 5583 5113 38 MMG SO RK 20 02/18/13 �. 1 7302 6373 46 MAG DMY RK 0 05/12/08 Minimum ID = 1.81" @ 9489' 14 1 111 , 1 7377 -•I3-1/2"HES X NP,D=2.813" 3-1/2" KBLINERTOPPACKER 111 1 1. 1 7392' -{3-1/7 X 4-1/2"XO,D=2.960" 4 j�►=1 I;4 739T H 7"x 4-1/7 BKR FER,D=3.875" 1. ;1 7407' -14-112-X 3-1/2'XO,D=2.960" 7"SCAB LNR,26#,L-80 BTC-M, -I 7506' 14 1 1743W -I3-1/2"HES X NP,D=2.813" .0383 bpf,D=6.276' 41 I 4 41 • 7"BOVVT3V CSG PATCH w/SEALS,D=6.276" H 7506' -7510' 7 •• 908T -I TNV TY PE LG SEAL ASSY,D=6.200" 7"LNR,29#,L-80 NSCC,.0371 bpf,D=6.184' -I 9086' 9118' -9-5/8"X 7"TMV LIP w TM/LNR HGR 8 TEBACK SLV,D=6.18" TOP OF 7"LNR -I 9117' -, MLLOUT VVN]OW(06-22A) 9297'-9347' 9-5/8"CSG,47#,L-80 BTC,D=8.681" --I 9297' 9466• -{3-1/2"X 4-1/2"XO,D=2.960" 09471' H7-1/2"X 4-1/2"BKR F R13 Fi(R,ID=3.875" 9483' -14-1/2"X 3-1/2"XO,D=2.960" li ii 9489' H3-112"KB LIP,D=1.81"(02/18/13) TOP OF 2-3/8"LNRH 9499' . ,I y50 H2.70"DEPLOY SLV,D=2.25" 3-1/2"TBG,9.2#,13CR-80 VAM TOP, -i 9566' 9505' -�2-3/8"PUPJOINf,D=1.920" .0087 bpf,D=2.992' 3-1/2"TBG STUB(05/06/08) -I 9569' 9514' -{3 1/2"FES X PP,D=2.813" 9581' _H7-1/2"X 3-1/2"UNIQUE OVERSHOT BEHIND CT LNR EST TOC(TAGGED 01/27/13) H 9638' 9591• 3-1/7 PARKERSWSNP,ID=2.813" 3-1/2"TBG-PC,9.3#,L-80 TDS,.0087 bpf,D=2.992" -I 9681' C 9615' H7-1/2'X 3-1/2"BKR SABL-3 FKR,D=3.87" 7.1 I. 9652' H3-1/2'PARKER SWS NP,D=2.813' PERFORATION SUMMARY FREE LOG:SLB MCN-ON 02/09/13 I1 9669' -3-1/2"PARKER SWN MP, ANGLE ATTOP PERE:90° 10825' BEHIND C�3 MLLED TO 2.80"(01/27/13) CT LNR Note:Refer to Production DB for historical perf data4 SIZE SPF INTT32VAL Opn/Sqz SHOT SQZ 9681' 3-1/2"VVLEG,ID=2.992" 1.56" 6 10825-10870 0 06/03/14 1.56" 6 10900-11155 C 02/10/13 k k MLLOUT WINDOW(06-22B) 10256'- 10262' }, 10425' _H CALCULATED TOC 2-3/8"LNR �►` # 4`'�ray (02/08/13) 3-1/2'MONOBORE WHIPSTOCK(01/30/13) -I 10256' 4.4p.••j�'+.' a >, 10884' 2-3/8"CFBP ?� 1 [7 MARJCHZJONf,-L1o2ss• �• (06/02/14) PBTD -1 10600• +.'.!'�. PBTD H 11159' IN, II. II. _. 7"LNR,29#,L-80 NSCC,.0371 f,D=6.184" - 10681' .� +'A -bP ,ti wv, 2-318"LNR,4.7#,13-CR SEL,.0039 bpf,ID=1.995" 11170' ►•fwf',.rte DATE REV BY COMENTS DATE REV BY COMVENTS PRUDHOE BAY INT 09/30/82 ROW 26 IMTIAL COMPLETION 02/20/13 TBD/PJC GLV CJO(02/18/13) WELL. 06-228 11/05/93 D16 SIDETRACK(06-22A) 03/13/13 JNJPJC PTD CORRECT 8 LTP(2/17/13) FIT No:"2121860 05/13/08 016 RWO 03/17/13 TBD'PJC LTP MND CORRECTION AA No- 50-029-20806-02 02/11/13 NORDIC 2 CTD SIDETRACK(06.22B) 06/04/14 JTC/JWD CBFVADPERFS(06/02-03/14) SEC 2,T1 ON,R14E,584'FSL&985 FEL 02/15/13 WJVID DRLG DRAFT CORRECTIONS 02/20/13 RA PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) LOGGED ' p/'a/2013 1 'tl 4,...4 H� t1. rL �— M K BENDER ,�`- PRINT DISTRIBUTION LIS' G: o 2x13 BAKER HUGHES AOGCC COMPANY BP Exploration(Alaska) Inc. INTERMEDIATE FINAL Yes (mandatory) 7.._k2....,ifigeQ WELL NAME 20 WELLS RUN NUMBER � (mandatory) 23\S k FIELD Prudhoe Bay BH SALESMAN Jesse Salyer (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 7/30/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska) Inc. _ (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FIELD FINAL (digitalCD / ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #UI-I'NIN I S #OF COPIES #OF COPIES a a a a s a s 1 BP Exploration(Alaska)Inc. 3 1 I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I 1 I I Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 1 3 ExxonMobil,Alaska I 1 I 1 I Attn Lynda NI.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I I 1 I I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I I I 1 I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: #REF! #REF! #REF! #REF! #REF! #REF! RECENED rte BAKER PRINT DISTRIBUTION LISTm 10 23 HUGHES AOGCC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME JC --2Z� , RUN NUMBER Z\Z— \�O (mandatory) 2_25(5-er-6. FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BR DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 6/5/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY CD FIELD FINAL (digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #Ob NHw I s #OF COPIES #OF COPIES 1 BP Exploration(Alaska)Inc. I 3 1 Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I 1 I I I Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska I 1 I 1 I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I 1 I 1 I I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I 1 I I I Attn:Sean Clifton 550 W.7th Ave,Suite 801) Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 McMains, Stephen E (DOA) From: Lastufka, Joseph N [Joseph.Lastufka@bp.com] Sent: Wednesday, April 24, 2013 8:17 AM To: Hunt, Jennifer L (DOT) Cc: McMains, Stephen E (DOA) Subject: PBU 06-22B/ PTD#212-186 Hi Jennifer, PT D ...... ( 86 Please reference the following well: Well Name: PBU 06-22B Permit#: 212-186 API #: 50-029-20806-02-00 Date of Test: 4/20/13 Type of Test: IPT (Initial Production Test) Choke Size: 80 Choke Unit: Production Method: Flowing Duration (HoursTe12 sted):Top Reference (TopPerf MD): 10900' RBDMS APR 2 4 2013 4 � y/ Bottom Reference (Bottom Perf MD): 11155' Tubing Flowing (Pressure): 340 Casing Pressure: 1500 Total Test(Rate f/0, W, G): 342/0/ 1000 24-Hour Rate (0, W, G): 683/0/2000 Gravity (Oil, API): Not Available GOR (Gas-Oil Ratio): 2928 This well began Production on Method of Operations on this date: 3/11/2013 1 Letter of Transmittal VU - to), -- Je4 BAKER Date: HUGHES _ March 4, 2013 To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7`h Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): 14-02CL 1 I /S 05-35AL2PB1,1055--3-35B c .j 3 " 0 1-8" 07-29E a / 3 - P-17L1 2 1 06-02B — - 6-22BPB 1, 06-22: 03(Q 06-24BPB1, 06-24B i Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: / to of Alaska AOGCC DATE: r IltULiVED , MAR 14 2013 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1 b. Well Class 20AAC 25105 20AAC 25110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One ®Development 0 Service 2 Operator Name: 5.Date Comp.,Susp.,or Aband: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 2/17/2013 212-186 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 2/1/2013 50-029-20806-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number Surface: 2/6/2013 PBU 06-22B 584'FSL, 985' FEL, Sec.02,T1ON, R14E, UM Top of Productive Horizon: 8. KB(ft above MSL): 63, 15.Field/Pool(s) 2453'FSL,2906' FWL, Sec.01,T1ON, R14E, UM GL(ft above MSL): 37 Prudhoe Bay/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD) 2791'FSL,3423'FWL, Sec.01,T1ON, R14E, UM 11159' 9039' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface' x- 685998 y- 5941182 Zone- ASP4 11170' 9039' ADL 028311 TPI• x- 689839 y- 5943149 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 690347 y- 5943499 Zone- ASP4 None 18. Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD). (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/MCNL 10256' 8828' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM Top BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 79' Surface 79' 30" 1910#Poleset 13-3/8" 72# L-80 Surface 2519' Surface 2519' 17-1/2" 2200 sx Fondu,400 sx PF'C' 9-5/8" 47# L-80 Surface 9297' Surface 7915' 12-1/4" 500 sx Class'G', 300 sx PF'C' 7" 26# L-80 2348' 7510' _ 2348' 6521' Scab Liner 779 sx Class'G' 7" 29# L-80 9117' 10256' 7753' 8828' 8-1/2" 358 cu ft Class'G' 2-3/8" 4.7# 13Cr80 9488' 11170' 8091' 9039' 3-1/4"x 3" 48 sx Class'G' 24. Open to production or injection'? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD (MD+TVD of Top&Bottom;Perforation Size and Number): ) 1.56"Gun Diameter,6 spf 3-1/2",9.3#/9.2#13Cr80 9681' 7397'/6439',9471'/8075' - 9615'/8212' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 10900'-11155', 9042'-9039' WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No 's: DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED '' .: 2500' Freeze Protect w/25 Bbls Diesel •dt a�0/ 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF' WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes 0 No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed) Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RRDMS MAR 15 7013 4e/12 Form 10-407 Revised 10/2012 ,/��,�//G//� CONTINUED�ON�REV,F�E� Submit Original Only i / � "// � 129. GEOLOGIC MARKERS(List all formations an kers encounter 30. FORMATION TESTS NAME rviJ ND Well Tested? Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test results. Attach separate sheets to this form,if needed,and submit Permafrost Base detailed test information per 20 AAC 25.071. 42SB/Zone 4A 10226' 8799' None (Kicked off from Parent) CGL 10264' 8835' Base of CGL/Zone 2C 10341' 8906' 23SB/Zone 2B 10420' 8968' 22TS/Zone 2B 10508' 9018' Formation at Total Depth: 22TS/Zone 2B 10508' 9018' 31.List of Attachment. Summary of Daily Drilling Reports, Summary of Post-Rig Report,Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact on Phillips,564-5913 Email. Ron.Phillips@bp.com Title: Drilling Technologist Printed Name: .- astu a Signature: ,1\\'x''^111)1 Phone 564-4091 Date:3/I 2.113 y INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b. TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20 Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26 (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TRII= CIW SAFE' )TES: W ELL ANGLE>70°@ WELLHEAD= FMC 0 6-2 2 B 10640 . CHROME TBG&LNR*** ACTUATOR= BAKER C NTWL KB.ELE 74' �) BF.ELEV- 20"CONDUCTOR, H 79' KOP= 2600' 91.5#,H-40 I - 2117' -13-1/2"HES X NIP,ID=2.813" Max Angle= 94°@ 10720' ID=19.124' Datum MD= 10293' 2348' H 9-5/8"X 7"BKR C-2 ZXP LTP,ID=6.290" Datum TVD= 8800'SS / 1 2365' -19-5/8"X 7"BKR FLEXLOCK HGR,D=6.350" TOP OF 7"SCAB LNR H 2348' f 4 • GAS LIFT MANDRELS A 4 STIMD TVD DEV TYPE VLV LATCH FORT DATE 13-3/8"CSG,72#,L-80,ID=12.347" 2519' 4, ' , 3 3230 3217 19 MMG DOME RK 16 02/18/13 IP •� 2 5583 5113 38 MMG SO RK 20 02/18/13 • 1 7302 L 6373 46 MMG DMY RK 0 05/12/08 Minimum ID = 1.920" @a 9505' �� I j 7372' -I -1/2"FES xNIP,ID=2.813" 2-3/8" PUP JOINT �. 1 7392' -{3-112"x4-1/2"X0,ID=2.960" 7397' 7"X 4-112"BKR PREMIER FCR,ID=3.875" • • I 7407' H4-1/2"X 3-1/2"X0,D=2.960" 7"SCAB LNR,26#,L-80 BTC-M, 7506' •: • 0383 bpf,ID=6.276" , 7439' -I 3-1/7 I-ES X NIP,ID=2.813" • • ; • 7"BOWEN CSG PATCH w/SEALS,ID=6.276" 7506' -7510' 9087' -I TIW TYPE LG SEAL ASSY,ID=6.200" 7"LNR,29#,L-80 NSCC, .0371 bpf,ID=6.184" H 9086' - 9118' -1 9-5/8"X 7"TM/LTP w/MI LNR HGR& TIEBACK SLV,D=6.18" TOP OF 7"LNR H 9117` MILLOUT WINDOW(06-22A) 9297'-9347' 9-5/8"CSG,47#,L-80 BTC,ID=8.681" -1 9297' L / 9466' --13-1/2"X 4-1/2"XO,ID=2.960" 0 9471' -17-1/2"X 4-1/T BKR PFR FKR,ID=3.875" J- 9483' -14-112"X 3-1/2"XO,ID=2.960" 9489' H 3-1/2"LTP,ID= ? "(02/18/13) TOP OF 2-3/8"LNR - 9499' 9499' -12.70"DEPLOY SLV,D=2.25" 3-1/2"TBG,9.2#,13CR-80 VAM TOP, - 9566' \ 9505' H2-3/8"PUP JONT,D=1.920" .0087 bpf,ID=2.992" 3-1/2"TBG STUB(05/06/08) H 9569' J r;'-'-''''''‘I 9514' -I 3-112"I-ES X NIP,ID=2.813" I----- 9581' -17-112"X 3-1/2"IR'JIQUEOVERSHOT BEHIND 9638' CT LNR EST TOC(TAGGED 01/27/13) �� 9591' H3-1/2"PARKER SWSN�',ID=2.813" 3-1/2"TBG-IPC,9.3#,L-801DS,.0087 bpf,ID=2.992" -1 9681' 2 Z--------. 9615' -17-112"X 3-1/2"BKR SABL-3 PKR,ID=3.87" PERFORATION SUMMARY ,, i 9652' H3-1/2"PARKER SWS NP,D=2.813" REF LOG:SLB MCNL ON 02/09/13 I f 9669' -3-1/2"PARKER SWN NP, BEHIND ANGLE AT TOP PERF:90°@ 10900' 2 .r MLLED TO 2.80'(01/27113) I CT LNR eTi 10'4 Note:Refer to Production DB for historical pert data r 9681' -I3-1/2"WLEG D=2.992" I SIZE SFF N+f1B VAL Opn/Sgz SHOT SQZ 1.56" 6 10900-11155 0 02/10/13 4/P44 4P MILLOUT WNNIDOW(06-22B) 10256'-10262' 41"4.• 10425' CALCULATE)TOC 2-3/8"LNR 3-112"MONOB ORE WHIPSTOCK(01/30/13) -{ 10256' �. �` y t** 1(02/08/13) O' 44, r MARKER JONT H 10266' ejtelte '...., 01oe- PBTD H 10600' PBTD H 11159' x_... 7"LNR,29#,L-80 NSCC,.0371 bpf,ID=6.184" - 10681' 2-3/8"LNR,4.7#,13-CR STL,.0039 bpf,D=1.995" -1 11170' DATE REV BY COI.ttENTS DATE REV BY COMMENTS PRUDHOE BAY MT 09/30/82 ROW 26 INITIAL COMPLETION 02/20/13 TBD/PJC GLV CIO(02/18/13) WELL 06-22B 11/05/93 D16 SIDETRACK(06-22A) 03/13/13 JNUPJC PTD(XRRECT'<P(2/17/13) FERNIT No:'2121860 05/13/08 1)16 RWO AR No: 50-029-20806-02 . 02/11/13 NORDIC 2 CTD SIDETRACK(06-228) SEC 2,T1 ON,R14E 584'FSL&985 FEL Q 02/15/13 ?/JMD DRLG DRAFT CORRECTIONS , , 02/20/13 RR PJC FINIAL DRLG CORRECTIONS BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 12 Operation Summary Report Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/lime:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor.NORDIC CALISTA UWI:/Lat:070°14'39.352"2 Long: 0148°29'51.297"W Active datum:orig rkb=74 c74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/25/2013 20:00 - 22:00 2.00 MOB P PRE BEGIN RON EVENT WITH NORDIC 2 CTD RIG AT 20:00 ON 01/25/13. HOLD PJSM WITH CREWS. VERIFY PRE MOVE CHECK LISTS ARE COMPLETE. BACK RIG OFF WELL DS 06-02B. SPOT RIG ON PAD. COMPETE POST WELL WELL WORK TRANSFER PERMIT WITH PAD OPERATOR. 22:00 - 00:00 2.00 MOB P PRE CLEAR RIG MATS FROM AROUND WELL.IAP= 0 PSI,OAP=0 PSI. 1/26/2013 00:00 - 01:00 1.00 MOB P PRE SPOT MATS AROUND WELL. 01:00 - 03:00 2.00 MOB P PRE MOVE OVER WELL.""ACCEPT RIG AT 03:00." 03:00 - 04:30 1.50 MOB P PRE SPOT SAT CAMP AND EQUIPMENT,PREP CELLAR AND OUTSIDE OF RIG. 04:30 - 05:00 0.50 MOB P PRE LEAK TIGHT TEST ON TREE. CONFIRM TWO BARRIERS BEFORE BREAKING CONTAINMENT. 05:00 - 09:00 4.00 BOPSUR P PRE NIPPLE UP BOP.GREASE AND SERVICE ALL VALVES ON THE MUD MANIFOLD, MUD CROSS AND BOP. 09:00 - 09:30 0.50 BOPSUR P PRE CONDUCT COMPLEX EVAC DRILL. UNCONTROLLED RELEASE.AAR. HOLD PRE SPUD MEETING WITH ALL HANDS. 09:30 - 11:30 2.00 BOPSUR P PRE SERVICE VALVES AND PREP FOR BOP TEST. FLOOD BOP AND PERFORM SHELL TEST. SHUT IN WELL DS 02-11AAND THE WELL IS LOCKED OUT/TAGGED OUT. 11:30 - 16:30 5.00 BOPSUR P PRE PRESSURE TEST BOPE PER ADWOP AND AOGCC REGULATIONS TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH.- PRESSURE TEST ANNULAR PREVENTER WITH 2"TEST JOINT-FUNCTION TEST KOOMEY ACCUMULATOR UNIT PER BP WELL CONTROL MANUAL AND NORDIC PROCEDURE. -TEST AND CALIBRATE GAS ALARMS. -FUNCTION ALL COMPONENTS FROM BOTH REMOTE STATIONS. -TEST WITNESSED BY AOGCC INSPECTOR LOU GRIMALDI. -SEE ATTACHED DOCUMENTATION REPORT AND CHARTS. 16:30 - 19:00 2.50 DRILL P WEXIT PU INJECTOR,DRESS E-LINE AND COIL,FILL COIL WITH H2O 19:00 - 19:30 0.50 DRILL P WEXIT PT INNER REEL VALVE AND PACKOFF-PASSED 19:30 - 21:30 2.00 DRILL P WEXIT PJSM,CUT 100'COIL,CUT 80'E-LINE,BOOT WIRE 21:30 - 22:00 0.50 DRILL P WEXIT EVAC DRILL WITH H2S AND MAN DOWN,AAR 22:00 - 23:00 1.00 DRILL P WEXIT PUMP SLACK BACK,MU COIL CONNECTOR, PULL TEST AND PT,PUMP SLACK FORWARD 23:00 - 00:00 1.00 DRILL P WEXIT REHEAD WITH BAKER Printed 2/25/2013 11:07:32AM North America-ALASKA-BP Page 2 of 12 Operation Summary Report Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/lime:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor.NORDIC CALISTA UWI:/Lat:070°14'39.352"2 Long: 0148°29'51.297"W Active datum orig rkb=74©74.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/27/2013 00:00 - 02:00 2.00 DRILL P WEXIT PRESSURE TEST COIL CONNECTION,CHECK VALVES&LUBRICATOR. 02:00 - 02:30 0.50 DRILL P WEXIT HELD PJSM TO PU BHA. CIRCULATE KCL INTO COIL. _ 02:30 - 03:30 1.00 DRILL P WEXIT MAKE UP MILLING BHA#1: -HCC DSM WINDOW MILL -2 1/8"X-TREME MOTOR -MWD TOOL PACKAGE WEAR SUB -CHECK VALVES COIL CONNECTOR 03:30 - 04:00 0.50 DRILL P WEXIT PRESSURE TEST QTS-250 LOW-3500 HIGH. GOOD. 04:00 - 09:00 5.00 DRILL N RREP 9,650.0 WEXIT TIGER TANK LINE FROZEN,REMOVED ICE PLUG WITH STEAM LINE. 09:00 - 09:45 0.75 DRILL P WEXIT RIH TO 2500'AT 85 FPM.PUMP KCL AT.5 BPM WITH 330 PSI.RETURNS TO TIGER TANK. 09:45 - 10:00 0.25 DRILL P WEXIT CIRCULATE OUT FREEZE PROTECT 10:00 - 11:00 1.00 DRILL P WEXIT RIH TO 9430'AT 90 FPM.PUMP.45 BPM,WITH 300 PSI.DISPLACE WELL TO 8.5 PPG POWERPRO.TAKE RETURNS TO TIGER TANK. 11:00 - 12:00 1.00 DRILL P WEXIT RUN TIE-IN LOG FROM 9430'TO 9607'WITH ORIGINAL LOG.TOP OF HRZ FORMATION.-36' CORRECTION. - 12:00 - 12:30 0.50 DRILL P WEXIT RIH SLOWLY.TAG CEMENT AT 9637'. ESTABLISH PARAMETERS AND FREE SPIN AT 1.5 BPM WITH 3375 PSI. 12:30 - 15:00 2.50 DRILL P WEXIT MILL CEMENT STRINGER TO 9648'.MILL HARD CEMENT FROM 9648'TP SWN NIPPLE AT 9672'.NOTED SLIGHT MOTOR WORK WHILE MILLING NIPPLE PROFILE.MILL CEMENT TO 9683'.NOTED CEMENT OVER SHAKERS. 15:00 - 15:15 0.25 DRILL P WEXIT PASS MILL THROUGH'SWN'NIPPLE.DRY DRIFT NIPPLE WITH NO PROBLEM.OPEN EDC.CIRCULATE. 15:15 - 17:30 2.25 DRILL P WEXIT POH.PUMP AT 1.9 BPM WITH 3270 PSI,FLOW CHECK 17:30 - 18:00 0.50 DRILL P WEXIT STAND BACK INJECTOR 18:00 - 19:00 1.00 DRILL P WEXIT LD BHA#1,PJSM,PU BHA#2 19:00 - 22:00 3.00 DRILL P WEXIT PU INJECTOR MAKE UP AND RIH,TIE IN AT 9500'WITH CORRECTION OF-36' 22:00 - 00:00 2.00 DRILL P WEXIT TAG CEMENT AT 9638 AND MILL FROM 9683' TO 9710, 3200PSI AT 1.42BPM 1/28/2013 00:00 - 06:00 6.00 DRILL P WEXIT DRILL 2.80"CEMENT PILOT HOLE F/9710'- 1 9785'MD. WOB-1-2K,PP-3200-3275,FREE SPIN-3200, FLOW IN/OUT-1.42/1.43, OA/IA-99/-105,ECD-10.54,MW IN/OUT-8.69/ 8.68 PPG ROP 10-15 FPH AND APPEARS TO BE SOLID/ FIRM. Printed 2/25/2013 11:07:32AM North America-ALASKA-BP Page 3 of 12 Operation Summary Report Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud DateRme:9/15/1982 12:00:OOAM Rig Release:2/11/2013 RigContractor NORDIC CALISTA O C C STA UWI:/Lat:070°14'39.352"2 Long: 0148°29'51.297"W Active datum:orig rkb=74©74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 12:00 6.00 DRILL P WEXIT DRILL 2.80"CEMENT PILOT HOLE F/9785'- 9872'MD. WOB-1-2K,PP-3354-3375,FREE SPIN-3200, FLOW IN/OUT-1.48 I 1.50, OA/IA-99/-105,ECD-10.58,MW IN/OUT-8.69/ 8.68 PPG ROP 10-15 FPH AND APPEARS TO BE SOLID/ FIRM. 12:00 - 00:00 12.00 DRILL P WEXIT DRILL 2.80"CEMENT PILOT HOLE F/9872'- 10,052'MD. WOB-1-2K,PP-3200-3395,FREE SPIN-3200, FLOW IN/OUT-1.52/1.53, OA/IA-99/-105,ECD-10.63,MW IN/OUT-8.69/ 8.68 PPG ROP 10-50 FPH AND APPEARS TO BE SOFT F/ 10,000'-10,052'MD. 1/29/2013 00:00 - 06:00 6.00 DRILL P WEXIT DRILL 2.80"CEMENT PILOT HOLE F/10,052'- 10,155'MD. WOB-1-2K,PP-3200-3395,FREE SPIN-3200, FLOW IN/OUT-1.52/1.52, OMA-90/-148,ECD-10.63,MW IN/OUT-8.71/ 8.71 PPG ROP 10-15 FPH AND APPEARS TO BE HARD/ FIRM F/10,052'-10,150'MD. 06:00 - 09.00 3.00 DRILL P .WEXIT DRILL 2.80"CEMENT PILOT HOLE F/10,155'- 10,200'MD. WOB-1-2K,PP-3391-3395,FREE SPIN-3200, FLOW IN/OUT-1.49/1.52, OA/IA-90/-154,ECD-10.67,MW IN/OUT-8.71/ 8.71 PPG ROP 10-15 FPH CEMENT IS HARD AND FIRM. 09:00 - 10:00 1.00 DRILL P WEXIT WIPER TRIP TO TOP OF THE CEMENT.NO PROBLEMS WITH TRIP. 10:00 - 12:00 2.00 DRILL P WEXIT DRILL 2.80"CEMENT PILOT HOLE F/10,200'- 10,x0'MD. WOB-1-2K,PP-3391-3395,FREE SPIN-3200, FLOW IN/OUT-1.49/1.52, OA/IA-90/-154,ECD-10.67,MW IN/OUT-8.71/ 8.71 PPG ROP 10-15 FPH CEMENT IS HARD AND FIRM. 12:00 - 20:00 8.00 DRILL P WEXIT DRILL CEMENT PILOT HOLE FROM 10,214'TO 10,295' WOB-1-2K,PP-3391-3395,FREE SPIN-3200, FLOW IN/OUT-1.49/1.52, OA/IA-90/-154,ECD-10.67,MW IN/OUT-8.71/ 8.71 PPG ROP 10-15 FPH CEMENT IS HARD AND FIRM. _ 20:00 - 23:30 3.50 DRILL P WEXIT REAM TOP OF CEMENT F/9,683'-9,705'MD i 45R REAM TOP OF CEMENT F/9,685'-9,710'MD 45L TIE IN AT 9,650'MD CORRECTION OF+2 23:30 - 00:00 0.50 DRILL P WEXIT FLOW CHECK,PJSM,POOH FROM 10,295'TO 5,050'MD. 1/30/2013 00:00 - 00:30 0.50 DRILL P WEXIT POOH F/5,050'-59'MD. 00:30 - 01:30 1.00 DRILL P WEXIT FLOW CHECK,GET OFF WEL,LD MILLING BHA. DIAMOND MILL IN GAUGE-2.79 NO GO/2.80 GO. Printed 2/25/2013 11:07:32AM North America-ALASKA-BP Page 4 of 12 Operation Summary Report Common Well Name:06-22 AFE No --- Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Dateflime:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°14'39.352"2 Long: 0148'29'51.297"W Active datum:orig rkb=74 @74.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:30 - 02:30 1.00 DRILL P WEXIT PJSM WITH CREW PU CALIPER BHA. MU PDS LOGGING TOOLS,DUMMY WHIPSTOCK&MWD TOOLS. START TIME FOR MEMORY TOOLS: ON BOTTOM BEFORE- 07:29 AM OPEN CALIPER AT -07:32 AM BEGIN LOGGING RUN-07:38 AM CLOSE CALIPER AT -08:35 AM POOH WITH TOOLS -08:41 AM 02:30 - 03:00 0.50 DRILL P WEXIT PICK UP INJECTOR AND GET ONTO WELL. PRESSURE TEST QTS-GOOD. 03:00 - 07:35 4.58 DRILL P WEXIT RIH WITH CALIPER LOGGING TOOLS F/85'- 10,150'MD. LOG TIE IN.MAKE-24.5'DEPTH CORRECTION. RUN INTO 10280 FT AND PARK,WAIT FOR ARMS TO OPEN. 07:35 - 08:35 1.00 DRILL P WEXIT LOG UP FROM 10280 FT UNTIL 08:35. 08:35 - 08:45 0.17 DRILL P WEXIT STOP AT 8060 FT,ALLOW CALIPER ARMS TO RETRACT. FLOW CHECK WELL,GOOD. 08:45 - 09:50 1.08 DRILL P WEXIT POOH. 09:50 - 10:20 0.50 DRILL P WEXIT PJSM AT 2000 FT FOR L/D LOGGING TOOLS. TRIP SHEET IS-2 BBLS FOR THE TRIP. 10:20 - 11:30 1.17 DRILL. P WEXIT TAG STRIPPER,FLOW CHECK WELL. L/D LOGGING TOOLS AND DRIFT,ALL TOOLS RECOVERED. 11:30 - 14:30 3.00 DRILL N HMAN WEXIT WAIT ON BTT PERSONNEL TO PICKUP WHIPSTOCK,CREW CHANGE DAY FOR THEM. 14:30 - 14:50 0.33 DRILL P WEXIT DATA SHOWS PILOT HOLE WASHOUT AT 10245.5 FT,RIGHT AT PLANNED WHIPSTOCK SETTING DEPTH. DISCUSS WITH CTD SUPT AND ODE MOVING WHIPSTOCK DOWN 10 FT. ASSEMBLE WHIPSTOCK ON THE CATWALK. 14:50 - 16:00 1.17 DRILL P WEXIT PICK UP BHA#4,WHIPSTOCK. BHA OAL=68.31 FT. PRESSURE TEST QTS,GOOD. 16:00 - 21:00 5.00 DRILL P WEXIT RIH BHA#4. PUMP 0.27 BPM/1060 PSI THROUGH OPEN EDC. SET PUMP TRIP AT 1500 PSI WHILE RIH., TIE IN AT 10,010'W CORRECTION OF-37.3', RIH SET WHIPSTOCK AT 10,263'(SET AT 4150 PSI) _ 21:00 - 23:00 2.00 DRILL P WEXIT POOH,PJSM,LD BHA, 23:00 - 00:00 1.00 DRILL P WEXIT CHANGE OUT PACKOFFS,PU INJECTOR AND STAB ON WELL, TEST PACKOFFS-PASSED 1/31/2013 00:00 - 01:30 1.50 STWFIIP P WEXIT MAKE UP BHA#5-2.80"WINDOW MILL, STRING REAMER,2.375"MOTOR,2 JTS 2.06 CSH,2.375"COILTRAK.CONFIRM MILL IS 2.80 GO,2.79 NO-GO.BHA OAL=123.09 FT. STAB INJECTOR,TEST QTS,GOOD. Printed 2/25/2013 11:07:32AM North America-ALASKA-BP Page 5 of 12 Operation Summary Report Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor.NORDIC CALISTA - UWI:/Lat:070°14'39.352"2 Long: 0148°29'51.297"W Active datum:orig rkb=74©74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (ft) 01:30 - 05:00 3.50 STWHIP P WEXIT RIH WITH BHA#5. START LOGGING GR FROM 10,070 FT.TIE-IN (-36.5)'CORRECTION. DRY TAG WHIPSTOCK AT 10257'MD. 05:00 - 08:40 3.67 STMILL P WEXIT TIME MILLING WINDOW AT 1 FPH AT 3425 PSI AND 1.5 BPM OF 8.7 PPG POWERPRO FROM 10,256'TO 10,257'.FS 3325 PSI,DHWOB:.5- 1.0 K LBS,10.71 PPG ECD,IA-80 OA-108. 08:40 - 09:30 0.83 STMILL P WEXIT MILL WINDOWAT 10259.40 FT. DWOB= 2.65K,CIRC PRESSURE=3520 PSI. PVT=391 BELS. 09:30 - 10:30 1.00 STMILL P WEXIT MILL WINDOWAT 10259.70 FT. DWOB= 2.54K,CIRC PRESSURE=3490 PSI. 10:30 - 11:20 0.83 STMILL P WEXIT MILL WINDOWAT 10260.40 FT. DWOB= 2.44K,CIRC PRESSURE=3470 PSI. 11:20 - 12:20 1.00 STMILL P WEXIT MILL WINDOW AT 10260.90 FT. DWOB= 2.46K,CIRC PRESSURE=3470 PSI. 12:20 - 13:00 0.67 STMILL P WEXIT MILL WINDOW AT 10261.40 FT. DWOB= 2.60K,CIRC PRESSURE=3440 PSI. 13:00 - 14:10 1.17 STMILL P WEXIT MILL WINDOWAT 10261.50 FT. DWOB= 2.37K,CIRC PRESSURE=3480 PSI. 14:10 - 15:10 1.00 STMILL P WEXIT MILL WINDOW AT 10262.00 FT. DWOB= 2.45K,CIRC PRESSURE=3500 PSI. 15:10 - 23:30 8.33 STMILL P WEXIT MILL WINDOW FROM 10262.40 FT.TO 10274.0 FT. DWOB=2.29K,CIRC PRESSURE=3520 PSI. DRY DRIFT WINDOW PASSED THROUGH WITH NO PROBLEM 23:30 - 00:00 0.50 STMILL P WEXIT FLOW CHECK,PJSM,POOH 2/1/2013 00:00 - 02:30 2.50 STMILL P WEXIT POOH F/10,274'-123'MD. 02:30 - 03:00 0.50 STMILL P WEXIT LD WINDOW MILL BHA#5. GAUGE MILL&STRING REAMER-2.80 NO GO /2.81 GO. 03:00 - 07:30 4.50 DRILL P PROD1 PERFORM COIL MANAGEMENT. CUT 100'OF COIL/100'OF E-LINE. RE-HEAD WITH SLB/BAKER COIL CONNECTIONS. PRESSURE/FUNCTION TEST COIL CONNECTION. FUNCTION TEST BOPS. CREW CHANGE. 07:30 - 08:30 1.00 DRILL P PROD1 PRESSURE TEST CT RISER SECTION THAT WAS BROKE APART TO USE THE HYDRAULIC CT CUTTER. 08:30 - 10:30 2.00 DRILL P PROD? PICK UP BHA#6-DRILLING ASSEMBLY 1MTH 1.8 DEG AKO. PRESSURE TEST QTS AND RIH. PUMP 0.60 BPM/1450 PSI THROUG OPEN EDC. 10:30 - 11:10 0.67 DRILL P PROW LOG TIE-IN FROM 10025 FT. CORRECT-39 FT. 11:10 - 11:30 0.33 DRILL P PROD1 PASS THROUGH WINDOW AND CLOSE EDC. BRING PUMP UP TO 1.60 BPM/3600 PSI OFF BOTTOM. EASE DOWN TO BOTTOM AND START DRILLING. FIND BOTTOM AT 10274.0 FT. Printed 2/25/2013 11:07:32AM North America-ALASKA-BP Page 6 of 12 Operation Summary Report Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°14'39.352"2 Long: 0148°29'51.297"W Active datum:orig rkb=74 @74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 12:30 1.00 DRILL P PROD1 START DRILLING SLOWLY FROM 10274.0 FT. SEVERAL STALLS GETTING STARTED. 12:30 - 12:35 0.08 DRILL P PROD1 PVT 157 BBLS. START SWAP TO NEW MUD. INOA=90/134 PSI. DHWOB=400 LBS. STRING WEIGHT=11890 LBS.DEPTH=10276'. ROP=5 FPH. FREE SPIN=3580 psi. ON BOTTOM @ -3650 PSI. 12:35 - 14:20 1.75 DRILL P PROW PICK UP IS CLEAN @ 26 KLBS. FREE SPIN 3560 PSI @ 1.58 BPM.GETTING MAGNETIC INTERFERENCE ON TOOLFACE. PICK UP TO GET CORRECT ORIENTATION. TAG BOTTOM AND CONTINUE SLOW DRILLING. 14:20 - 18:00 3.67 DRILL P PROD1 DRILL PAST 1Q286 FT AT 10 FT/HR. HOLD 15L TF FOR NOW TO BUILD ANGLE FROM PARENT WELL. 18:00 - 00:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 3.25"BUILD SECTION F/ 10,300'-10,330'MD. WOB-1-2K,PP-3300-3395,FREE SPIN-3200, FLOW IN/OUT-1.49/1.49, OA/IA-54/-144,ECD-10.68,MW IN/OUT-8.65/ 8.65 PPG 2/2/2013 00:00 - 07:00 7.00 DRILL P PROD1 DIRECTIONAL DRILL 3.25"BUILD SECTION F/ 10,330'-10,395'MD. WOB-1-2K,PP-3300-3395,FREE SPIN-3200, FLOW IN/OUT-1.49/1.49, OA/IA-84/-144,ECD-10.68,MW IN/OUT-8.65/ 8.65 PPG 07:00 - 08:10 1.17 DRILL P PROD1 CONTINUE DRILLING PAST 10400 FT. HOLD 45L TOOLFACE FOR NOW TO CONTINUE TO BUILD ANGLE. ROP IS 20-30 FT/HR WITH 2.5K DWOB. 1.52/1.51 BPM @ 3400 PSI. 8.67/8.68 PPG IN /OUT. PVT=459 BBLS. DRILL TO 10435 FT. 08:10 - 08:30 0.33 DRILL P PROD1 PICK UP AND GET SLOW PUMP PRESSURES. PULL 100 FT WIPER. 08:30 - 06:55 0.42 DRILL P PROD1 DRILL TO 10440 FT. ROP IS SUSTAINED AROUND 12 FT/HR. REQUIRING DWOB AROUND 2.5K TO ACHIEVE THAT. 08:55 - 09:10 0.25 DRILL P PROD1 POOH FOR BIT CHANGE. PULL THROUGH WINDOWAND OPEN EDC. 09:10 - 09:35 0.42 DRILL P PROD1 LOG LONG TIE-IN FROM 10040 FT TO TIE-IN RA MARKER. CORRECT+2 FT. RUN DOWN AND LOG RA MARKER IN WHIPSTOCK,FIND IT AT 10262.0 FT. CONFIRM WINDOW INTERVAL FROM 10,256 TO RA TAG AT 10,262'. 09:35 - 11:20 1.75 DRILL P PROD1 PICK UP ABOVE WINDOW AND FLOWCHECK WELL. FLOWCHECK IS GOOD. POOH,PUMP 1.9 BPM/3500 PSI WHILE POOH. LOG CCL ACROSS LINER TOP AREA WHILE POOH. 11:20 - 12:00 0.67 DRILL P PROD1 CONDUCT PJSM WHILE POOH AT 2000 FT. TRIP SHEET IS-2 BBLS TO THIS POINT. PERFORM JOG AT SURFACE THEN CLOSE EDC,FLOWCHECK WELL. FLOWCHECK IS GOOD,TAG STRIPPER. Printed 2/25/2013 11:07:32AM • North America-ALASKA-BP Page 7 of 12 Operation Summary Report - Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Tme:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:0701 4'39.352"2 Long: 0148"29'51.297"W Active datum:orig rkb=74 @74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 12:00 - 12:40 0.67 DRILL P PROD1 OPEN CT RISER AND STAND BACK INJECTOR. LIFT BHA OUT AND CHANGE BITS. BIT IS 5-2, ONE MISSING CUTTER ON NOSE. CHECK MOTOR,STILL GOOD. MAKE UP BHA#7,BUILD ASSEMBLY WITH 1.8 DEG AKO AND NEW HCC 2.74 X 3.25 BI-CENTER. 12:40 - 15:00 2.33 DRILL P PROD1 PRESSURE TEST QTS,RIH. 15:00 - 15:40 0.67 DRILL P PROD1 LOG GR FROM 10050 FT. CORRECT-40 FT. PASS BIT THROUGH WINDOW AND CLOSE EDC. 15:40 - 18:00 2.33 DRILL P PROD1 DRILL FROM 10442 FT. HOLD 15L TF FOR NOW TO CONTINUE BUILDING ANGLE. INITIAL ROP IS 30 FT/HR WITH 1.1K DWOB. 1.66/1.67 BPM @ 3450 PSI FREE SPIN. 18:00 - 21:30 3.50 DRILL P PROD1 DIRECTIONAL DRILL 3.25"BUILD SECTION F/ 10,535'-10,636'MD. WOB-1-2K,PP-3300-3395,FREE SPIN-3200, FLOW IN/OUT-1.49/1.49, OMA-84/-164,ECD-10.68,MW IN/OUT-8.65/ 8.65 PPG 21:30 - 00:00 2.50 DRILL P ' PROD1 POOH F/10,636'-10,274'MD. POOH TO 9,650'MD.CLOSE EDC,FLOW CHECK,GOOD. POOH F/9,650'-62'MD.FLOW CHECK,GOOD. 2/3/2013 00:00 - 01:30 1.50 DRILL P PROD1 GET OFF OF WELL.LD BUILD BHA#7. PU LATERAL BHA#8.(BIT,MOTOR,COILTRAK) GET ON WELL,TEST QTS-GOOD. 01:30 - 05:00 3.50 DRILL P PROD1 RIH F/62'-9,650'MD. LOG RA TAG,TIE IN WITH-38 DEPTH CORRECTION. RIH TO BOTTOM. 05:00 - 06:30 1.50 DRILL P PROD1 DIRECTIONAL DRILL 3.25"LATERAL SECTION F/10,636'-10,660'MD. WOB-1-2K,PP-3300-3395,FREE SPIN-3200, FLOW IN/OUT-1.49/1.49, OA IA-84/-164,ECD-10.68,MW IN/OUT-8.65/ 8.65 PPG 06:30 - 09:30 3.00 DRILL P PROD1 CONTINUE DRILLING PAST 10660 FT. CONTINUED SLOW DRILLING,LAST SAMPLE AT 10630 FT SHOWED 70%CHERT. PVT=449 BBLS. ROP IS AROUND 20 FT/HR WITH 1.5K DWOB. FREQUENT STALLS AROUND 10690 FT. 1.60/1.61 BPM @ 3400 PSI FREE SPIN. DRILL TO 10800 FT. 09:30 - 11:40 2.17 DRILL P PROD1 WIPER TRIP AND MAD PASS TO WINDOW. CLEAN PASS UP AND DOWN. 11:40 - 13:00 1.33 DRILL P PROD1 CONTINUE DRILLING FROM 10800 FT. ROP IS AROUND 100 FT/HR,SLOWLY DECLINING TO 50 FT/HR BY 10885 FT. 1.73/1.74 BPM 2 3500 PSI FREE SPIN. CONTINUE HOLDING 92 DEG INC FOR NOW TO GAIN ND. 8.69/8.73 PPG IN/OUT. PVT=444 BBLS. IA/ OA=95/199 PSI. ECD=10.88 PPG. ROP CONTINUES AROUND 50 FT/HR PAST 10930 FT. Printed 2/25/2013 11 07 32AM North America-ALASKA-BP Page 8 of 12 Operation Summary Report Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/me:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°14'39.352"2 Long: 0148°29'51.297"W Active datum:orig rkb=74 t 74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 13:40 0.67 DRILL P PROD1 DRILL PAST 10910 FT AT 70-80 FT/HR. GIVE SLB CEMENT SUPERVISOR BHCT=152 DEG TO START PILOT TESTS. CONTINUE HOLDING 92 DEG INC FOR NOW AS PER GEO,NEED TO GAIN ABOUT 3 FT TVD. 1,74/1.74 BPM t 3500 PSI FREE SPIN. 13:40 - 15:20 1.67 DRILL P PROD1 AFTER STALL AT 10938 FT,PICK UP AND GET SLOW PUMP PRESSURES. PUMP#1 0.5 BPM=1890 PSI,1.0 BPM=2465 PSI. PUMP#2 0.5 BPM=1895 PSI,1.0 BPM=2472 PSI. CONTINUE DRILLING FROM 10940 FT. DRILL TO 11024 FT. 15:20 - 18:00 2.67 DRILL P PROD1 SEVERAL STALLS AT 11024 FT,PULL BHA WIPER HERE. CONTINUE DRILLING WITH SLOWER, INCONSISTENT ROP. PVT=439 BBLS. 1.72/1.72 BPM©3500 PSI FREE SPIN. 18:00 - 22:30 4.50 DRILL P PROD1 DIRECTIONAL DRILL 3.25"LATERAL SECTION F/11,106'-11,170'MD. WOB-2-3K,PP-3500-3650,FREE SPIN-3500, FLOW IN/OUT-1.54/1.54, OMA-103/-225,ECD-10.89,MW IN/OUT- 8.71/8.72 PPG AVG ROP 15 FPH,SAMPLES SHOW 20% CHERT. DECREASING ROP,POOH TO CHANGE BIT. PVT-387 22:30 - 00:00 1.50 DRILL P PROD1 POOH F/11170'-10255'MD.OPEN EDC. PUMP MAX RATE WHILE POOH 1.78 BPM. PULL @ 25 FPM WHILE IN CEMENT PILOT HOLE TO 9650'MD. 2/4/2013 00:00 - 01:30 1.50 DRILL P PROD1 PULL @ 100 FPM WHILE IN 3-1/2"TUBING TO 62'MD. RIH TO 250'MD.CLOSE EDC. FLOW CHECK.POWER DOWN MWD TOOLS. POOH,TAG UP,STAND INJECTOR BACK. 01:30 - 02:30 1.00 DRILL P PROD1 BLOW DOWN DIRECTIONAL TOOLS. LD HYCALOG BIT SER#A158044.(GRADE 5-2 W/RINGING OUT ON NOSE ROW). MU HYCALOG BIT SER#A158045(NEW BIT). INSPECT MOTOR&MWD-GOOD.RE-RUN IN BHA#9, PU INJECTOR,TEST QTS-GOOD. 02:30 - 08:40 6.17 DRILL P PROD1 RIH WITH BHA#9 F/62'-9650'MD.PUMP RATE MIN-0.45/0.79 BPM.PVT-388 RIH©90'FPM WHILE IN 3-1IT'TUBING TO 9650'MD. RIH la 25'FPM WHILE IN CEMENT PILOT HOLE TO 10,255'MD. LOG TIE IN W/-37.5'DEPTH CORRECTION. RIH©25'FPM TO BOTTOM. Printed 2/25/2013 11:07:32AM North America-ALASKA-BP Page 9 of 12 Operation Summary Report Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070`14'39.352"2 Long: 0148'29'51.297"W Active datum:orig rkb=74©74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Desaiption of Operations (hr) (ft) 08:40 - 10:10 1.50 DRILL P PROD1 CONTINUE DRILLING PAST 11194 FT AT 13 FT/HR WITH 1.2K DWOB. STALLS IF PUSHED HARDER THAN THIS. 1.62/1.63 BPM @ 3420 PSI FREE SPIN. PVT= 425 BBLS. 8.72/8.73 PPG IN/OUT WITH 10.85 PPG ECD. 10:10 - 12:30 2.33 DRILL P PROW --CONTINUE DRILLING PAST 11205 FT. ROP IS 10-15 FT/HR WITH 1.2K DWOB. HOLD 15L TOOLFACE FOR NOW TO GAIN ND AND TRY TO DRILL OUT OF HARD ZONE. PVT=423 BELS. 12:30 - 14:00 1.50 DRILL P PROD1 DRILL PAST 11232 WITH CONTINUED LOW ROP,AROUND 10-15 FT/HR. APPEAR TO BE DRILLING A MASSIVE SHALE,LIKELY 22N. PVT=421 BBLS. 1.71/1.72 BPM @ 3600 PSI FREE SPIN. CONTINUE PUSHING UP TO REGAIN ZONE 2 SAND. 14:00 - 17:00 3.00 DRILL P PROD1 AFTER 11240 ROP PICKS UP TO AROUND 30 FT/HR FOR A SHORT TIME. 17:00 - 18:00 1.00 DRILL P PROD1 CONTINUE DRILLING PAST 11280 FT,STILL IN WHAT APPEARS TO BE A LONG SHALE INTERVAL. ROP IS 10-15 FT/HR WITH 2K DWOB. 18:00 - 21:00 3.00 DRILL P PROD1 CONTINUE DRILLING PAST 11330'MD AT 10-15 FPH.STILL DRILLING IN SHALE INTERVAL. HAVE SEEN INCREASES IN ROP 15-25 FPH. BIT IS STILL ABLE TO DRILL GOOD ROP WHEN NOT IN SHALE. BPM-1.5/1.5 WOB-1-2 PP-3550-3600 ECD- 10.87 PVT-425. 21:00 - 23:30 2.50 DRILL P PROD1 CONTINUED DRILLING TO 11357'MD AT 10-15 FPH.STILL DRILLING IN LONG 22N SHALE INTERVAL.DRILLING UP IN FORMATION F/ 11180'-11357'MD ATTEMPTING TO FIND THE TOP OF THE UP THRUST.ND DECREASED F/ 8981'-9875'.DECISION MADE BY ENGINEERING TEAM TO POOH AND SET AN OPEN HOLE ALUMINUM BILLET @ 10690'MD. 23:30 - 00:00 0.50 DRILL P PROD1 POOH F/11357'-10255'MD.OPEN EDC. PUMP MAX RATE WHILE POOH 1.78 BPM. PULL @ 25 FPM WHILE IN CEMENT PILOT HOLE TO 9650'MD. 2/5/2013 00:00 - 03:00 3.00 DRILL P PROD1 PULL @ 100 FPM WHILE IN 3-1/2"TUBING TO 62'MD. RIH TO 250'MD.CLOSE EDC. FLOW CHECK.POWER DOWN MWD TOOLS. POOH,TAG UP,STAND INJECTOR BACK. 03:00 - 04:00 1.00 DRILL C PROD? LD BIT,MOTOR 8 MWD TOOLS.BIT GRADE 1-1 WITH BROKEN TEETH ON MIDDLE ROW. PU ALUMINUM BILLET AND MWD TOOL. SCRIBED HIGH SIDE OF BILLET. PU INJECTOR,TEST QTS-GOOD. 04:00 - 07:00 3.00 DRILL C PROD1 RIH WITH BILLET ASSEMBLY F/70'-9650'MD. 07:00 - 08:00 1.00 DRILL N WAIT PROD1 CIRCULATE ABOVE PILOT HOLE,WAIT ON DIRECTIONAL WORK TO BE FINALIZED TO ASCERTAIN SETTING DEPTH AND ORIENTATION. 08:00 - 08:20 0.33 DRILL C PROD1 TIE-IN AT 10020 FT,CORRECT-37.5 FT. Printed 2/25/2013 11:07:32AM North America-ALASKA-BP Page 10 of 12 Operation Summary Report Common Well Name:06-22 AFE No • Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Daterfine:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°14'39.352'2 Long: 0148°29'51.297"W Active datum'orig rkb=74(4174.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:20 - 08:40 0.33 DRILL C PROD1 STOP ABOVE WINDOW,CLOSE EDC. RIH TO BILLET SETTING DEPTH. STOP AT 10711.7 FT,WHICH PLACES TOP OF BILLET AT 10700 FT. ORIENT TOP SLIP OL FOR A 55L KICKOFF. PRESSURE UP TO 4200 PSI,SHEAR OFF SETTING TOOL. STACK 3K DWOB TO VERIFY SET,GOOD. _ 08:40 - 10:30 1.83 DRILL C PROO1 POOH,PUMP 1.2 BPM((t 2650 PSI. 10:30 - 11:00 0.50 DRILL C PROD1 AT 2000 FT FROM SURFACE,PJSM FOR CHANGE OUT BHA. TRIP SHEET IS-3 BBLS TO THIS POINT. 11:00 - 11:20 0.33 DRILL C PROD1 TAG STRIPPER AND FLOW CHECK WELL, GOOD. L/D BILLET SETTING TOOL. 11:20 - 11:40 0.33 DRILL C PROD1 HI-LEVEL H2S WITH RIG EVAC EXERCISE. ALL PERSONNELARE ACCOUNTED FOR IN UNDER 2 MIN. CONDUCT AAR IN THE OFFICE TRAILER. 11:40 - 14:30 2.83 DRILL C PROD1 RIG UP HYDRAULIC CT CUTTER AND CUT 100 FT OF CT OFF FOR CHROME MANAGEMENT. INSTALL CT CONNECTOR AND PULL TEST TO 35K,GOOD. INSTALL BHI CABLE HEAD AND PRESSURE TEST 250/3500 PSI,GOOD. 14:30 - 15:00 0.50 DRILL C PROD1 PRESSURE TEST CT RISER CONNECTION THAT WAS TAKEN APART EARLIER TO CUT CT. PT IS GOOD. 15:00 - 15:55 0.92 DRILL C PROD1 MAKE UP BHA#11,REBUILT HYC 2.7 X 3 11 BICENTER,1.1 DEG XTREME,2.375 COILTRAK WITH RESISTIVITY. BHA OAL=69.63 FT. PRESSURE TEST QTS SUB,GOOD. 15:55 - 18:35 2.67 DRILL C PROD1 RIH BHA#11. PUMP 0.37 BPM/1070 PSI THROUGH OPEN EDC. TAG BILLET AT 10,700'. 18:35 - 21:30 2.92 DRILL C PROD1 10,700'START TIME MILLING BILLET AT 1 FT/HR WITH 3360 PSI AT 1.5 BPM IN/OUT.MILL TO 10702'WITH 1 STALL AT 10,701', OTHERWISE MINIMAL WOB AND MOTORWORK.SEE ALUMINUM ACROSS SHAKERS. 21'30 - 23:00 1.50 DRILL C PROD1 CONTINUE MILLING BILLET MAINTAINING WOB OF 500 LBS.FREESPIN 3360 PSI AT 1.57 BPM.ROP—2 FPH IN/OUT.200 PSI MOTORWORK. 23:00 - 00:00 1.00 DRILL C PROD1 DRILL FROM 10,710'AT ROP OF 30 FPH,1.4K# WOB AT 1.57 BPM IN/OUT AT 3840 PSI. 2/6/2013 00:00 - 02:00 2.00 DRILL C PROD1 DRILL AHEAD FROM 10732'AT 30-40 FPH,1.57 BPM IN/OUT AT 3590 PSI WITH 1.7K#WOB, 10.83 PPG ECD DRILL TO 10810' 02:00 - 03:30 1.50 DRILL C PROD1 DRILL WITH SLOWER ROP OF—25 FPM.ROP INCREASE TO 80 FPH AT 10,825'.START CLEANING PITS FOR MUD SWAP. Printed 2/25/2013 11:07.32AM North America-ALASKA-BP Page 11 of 12 Operation Summary Report Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°14'39.352"2 Long: 0148°29'51.297"W Active datum:orig rkb=74©74.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:00 0.50 DRILL C PROD1 BHA WIPERAT 10850'. GET SPRS AT 10850' PUMP 1:0.5 BPM=1868 PSI,1.0 BPM=2340 PSI,1.6 BPM=3183 PSI PUMP 2:0.5 BPM=1827 PSI,1.0 BPM=2325 PSI,1.6 BPM=3153 PSI 04:00 - 08:30 4.50 DRILL C PROD1 -DRILL AHEAD FROM 10,850'AT 90 FPH,START NEW MUD DOWN COIL AT 1.6 BPM IN/OUT AT 3520 PSI.1.2K#DHWOB.COME UP 3'ND PER GEO AND THEN MAINTAIN 90 DEGREES. 08:30 - 10:20 1.83 DRILL C PROD1 CONTINUE DRILLING PAST 11104 FT. ROP IS 30-40 FT/HR WITH 2.6K DWOB. 1.63/1.62BPM©3300 PSI FREE SPIN. ECD=10.80 PPG,PVT=371 BBLS. DRILL TO TD OF 11170 FT. TD IS CALLED AT THIS DEPTH TO FINISH THE WELL BEFORE DRILLING INTO THE 22N SHALE. 10:20 - 11:40 1.33 DRILL C PROD1 WIPER TRIP BACK TO WINDOW. PULL PAST BILLET AT 0.3 BPM,60L TF. SLIGHT 4K OVERPULL AT 10700 FT. LOG GR TIE-IN FROM 10275 FT,CORRECT +1.5 FT. RUN BACK PAST BILLET,SLIGHT WEIGHT SET DOWN AT 10707 FT AT 60L,NO PUMP. TAG BOTTOM AT 11170 FT,OFFICIAL TD. 11:40 - 12:50 1.17 DRILL C PROD1 START LINER PILL WITH BEADS DOWN THE CT. LAY IN LINER PILL WITH BEADS FROM TD TO WINDOW. SEE SLIGHT 4K OVERPULL AGAIN AT TOP BILLET,10700 FT. 12:50 - 14:50 2.00 DRILL C PROD1 STOP AT 10274 FT AND OPEN EDC. PULL THROUGH WINDOW THEN SWAP WELL TO 1%KCL AT MAX RATE. CONTINUE PICK UP HOLE WHILE SWAPPING WELL OVER. 14:50 - 17:00 2.17 DRILL C PROD1 STOP AT 10170 FT AND FLOW CHECK WELL, GOOD. POOH. 17:00 - 18:00 1.00 DRILL C PROD1 STOP AT 200 FT AND FLOW CHECK WELL, GOOD. TAG STRIPPER,L/D BHA. BIT IS 5-3,WITH 3 MISSING CUTTERS. 18:00 - 18:35 0.58 DRILL C PROD1 REMOVE BHI CABLE HEAD. INSTALL NOZZLE AND GET BACK ON WELL, PREP TO PURGE REEL. 18:35 - 20:30 1.92 DRILL C PROD1 PRESSURE TEST LINE FOR NITROGEN BLOWDOWN,250/3500 PSI.GOOD TEST AFTER 5 ATTEMPTS FOR HIGH TEST. 20:30 - 21:20 0.83 DRILL C PROD1 STAB INJECTOR,CIRCULATE COIL TO FRESHWATER AND INHIBITED WATER FOLLOWED BY MEOH.SWAB VALVE IS SHUT. 21:20 - 21:45 0.42 DRILL C PROD1 PJSM FOR NITROGEN BLOWDOWN 21:45 - 22:10 0.42 DRILL C PROD1 BRING NITROGEN ONLINE AND DISPLACE FLUID FROM COIL AT 1800 SCF/MIN. 22:10 - 22:30 0.33 DRILL C PROD1 SHUT DOWN NITROGEN.RIG DOWN UNIT. BLOW DOWN LINE TO TIGER TANK. 22:30 - 22:45 0.25 DRILL C PROD1 PJSM FOR PULLING BACK COIL Printed 2/25/2013 11:07:32AM North America-ALASKA-BP Page 12 of 12 Operation Summary Report Common Well Name:06-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/25/2013 End Date:2/6/2013 X3-012GW-C:DRILL(2,399,973.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud DateTme:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070"14'39.352"2 Long: 0148'29'51.297"W Active datum:orig rkb=74 @74.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:45 - 00:00 1.25 DRILL C PROD1 PICK UP INJECTOR,CUT OFF COIL CONNECTOR,INSTALL GRAPPLE AND PULL TEST.PULL COIL ACROSS TOP,INSTALL SHIPPING BAR. Printed 2/25/2013 11:07:32AM North America-ALASKA-BP Page 1 of 6 Operation Summary Report Common Well Name:06-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/7/2013 End Date:2/11/2013 X3-012GW-C:DRILL(1,570,234.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat 070°14'39.352"2 Long: 0148°29'51.297"W Active datum:orig rkb=74©74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/7/2013 00:00 - 01:30 1.50 CASING P RUNPRD SECURE COIL TO REEL,REMOVE REEL HARDLINE,POSITION EMPTY TRAILOR. 01:30 - 01:45 0.25 CASING P RUNPRD PJSM FOR LOWERING REEL WITH CH2MHILL, SLB AND RIG CREW. 01:45 - 03:30 1.75 CASING P RUNPRD LOWER 2"E-COIL AND SECURE TO TRUCK. RAISE 2"E-FREE REEL INTO REEL HOUSE. 03:30 - 06:30 3.00 CASING P RUNPRD INSTALL REEL IN REEL HOUSE WITH HARDLINE,PREP TO PULL COILACROSS. _ 06:30 - 06:50 0.33 CASING P RUNPRD •FILL WELL WITH 7 BBLS. AFTER FILLING SHUT DOWN PUMP AND MONITOR WELL,FLOWING BACK SLIGHTLY. 06:50 - 07:30 0.67 CASING P RUNPRD SHUT IN WELLAT HAND CHOKE AND •MONITOR PRESSURE,SHOWING 15-20 PSI. CHECK NEEDLE VALVE ON NIGHT CAP, SHOW 0 LEL. MAKE NOTIFICATION TO CTD SUPT OF WELL SHUT IN. - 07:30 - 08:00 0.50 CASING P RUNPRD LINE UP WELL THROUGH MGS AND OPEN IT, NO FLOW SEEN. OPEN NEEDLE VALVE ON NIGHT CAP,NO PRESSURE. -REMOVE NIGHT CAP AND FILL WELL WITH 1.3 BBLS. MONITOR FLUID LEVEL FOR 30 MIN,STATIC, NO BUBBLING. MEANWHILE CONTINUE PREP TO RUN LINER. INSTALL CT CONNECTOR,PULL TEST TO 36K. 08:00 - 09:00 1.00 CASING P RUNPRD FILL REEL WITH MEOH THEN 1%LUBED KCL FROM THE PITS. 09:00 - 10:00 1.00 CASING P RUNPRD MAKE UP DART CATCHER TO END OF CT, GET ON WELL. PJSM THEN PRESSURE TEST INNER REEL VALVE AND CT STRIPPER TO 250/3500 PSI, GOOD. 10:00 - 11:00 1.00 CASING P RUNPRD PUMP A DARTAROUND TO VERIFY REEL VOLUME. DART LANDS AT 42.9 BBLS. 11:00 - 12:00 1.00 CASING P RUNPRD PREP RIG FLOOR TO RUN LINER. RIG UP FARRS,RIG UP ELEVATORS. SET INJECTOR ON LEGS. RIG UP DRIFT JOINT. PJSM FOR RUNNING LINER. 12:00 - 16:40 4.67 CASING P RUNPRD RUN LINER AS PER LINER SUMMARY. TOTAL OF 53 JTS. DRIFT EVERY CONNECTION WITH A 1.88"DRIFT. FILL LINER WITH 1%KCL FROM PITS AFTER 18 AND 36 JTS. 16:40 - 17:10 0.50 CASING P RUNPRD PICK UP INJECTOR,PRESSURE TEST CT CONNECTOR TO 250/3500 PSI,GOOD. 17:10 - 20:00 2.83 CASING P RUNPRD MAKE UP CT RISER. PRESSURE TEST QTS TO 250/3500 PSI,GOOD. •RIH. PUMP 0.90 BPM/760 PSI. PUWAT 11,000'27K LBS LAND LINER AT 11,210'UNCORRECTED WITH 10K,CORRECT TO TD OF 11,170'. Printed 2/25/2013 11:08:42AM North America-ALASKA-BP Page 2 of 6 Operation Summary Report Common Well Name:06-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/7/2013 End Date:2/11/2013 X3-012GW-C:DRILL(1,570,234.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°14'39.352"2 Long: 0148°29'S1.297"W Active datum:orig rkb=74©74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 21:00 1.00 CASING P RUNPRD CIRC 5/8"BALL AT 1 BPM,LAND ON SEAT AT 36.6 BBLS PUMPED,SHEAR AT 2250 PSI. PICK UP TO CONFIRM LINER IS RELEASED WITH 23K LBS PUW 21:00 - 22:00 1.00 CASING P RUNPRD SEND WATER TO CEMENTERS,STAGE VAC TRUCKS,SLB RIG CHANGEOUT 22:00 - 22:40 0.67 CASING P RUNPRD PJSM FOR CEMENT JOB 22:40 - 00:00 1.33 CASING P RUNPRD PRESSURE TEST CEMENT LINE TO 250/6000 PSI. 2/8/2013 00:00 - 02:00 2.00 CASING P RUNPRD BATCH UP 10 BBLS OF CEMENT TO PUMP 3.2 BBLS.CEMENT AT 15.8 PPG AT 00:18 FOR BATCH UPTIME. PUMP 10 BBLS OF KCL WITH NO LUBES AS SPACER FOLLOWED BY 3.4 BBLS 15.8 PPG CEMENT.ZERO MICROMOTION AT LEAD OF CEMENT. PUMP AT 1.5 BPM AT 1700 PSI.ISOLATE CEMENTERS,LOAD PEE-WEE DART IN COIL, LAUNCH DART WITH 400 PSI,START RIG DISPLACEMENT WITH 8.5 PPG POWERPRO. DISPLACE AT 1.9 BPM AND 2930 PSI.SLOW DISPLACEMENT TO 1 BPM AS CEMENT ENTERS LINER.PEE-WEE DART LANDS IN LWP AT 46.9 BBLS,SHEARS AT 3700 PSI, ZERO OUT MICRO-MOTION WITH CEMENT AT SHOE,LWP LAND AT 53.8 BBLS,3.4 BBLS CEMENT BEHIND LINER.PRESSURE UP TO 3400 PSI TO CONFIRM LAND,HOLD PRESSURE FOR 4 MIN.SLOWLY BLEED PRESSURE OFF OF COIL,FLOATS HOLDING, PRESSURE UP TO 400 PSI AND PULL OUT OF DEPLOYMENT SLEEVE.PUW 23K LBS.CIRC 1 BBL OF POWERPRO. 02:00 - 04:00 2.00 CASING P RUNPRD POH WITH LINER RUNNING/CEMENTING BHA FROM 9498'.PUMPING 0.75 BPM AT 1040 PSI. 04:00 - 04:15 0.25 CASING P RUNPRD FLOWCHECKAT SURFACE,PJSM FOR BHA. 04:15 - 04:40 0.42 CASING P RUNPRD STAND BACK INJECTOR,LAY DOWN LINER RUNNING BHA. RECOVER 5/8"BALL. 04:40 - 05:15 0.58 CASING P • RUNPRD FUNCTION TEST BOPE 05:15 - 06:00 0.75 EVAL P OTHCMP PREP TO PICK UP CSH FOR CLEANOUT RUN, MAKE UP SAFETY JOINT 06:00 - 10:00 4.00 EVAL P OTHCMP PJSM THEN START M/U CLEANOUT ASSEMBLY. M/U 1.75 MILL,MOTOR,1/2 CIRC SUB,5/8 DISCONNECT,60 JTS 1"CSH,3/4 DISCONNECT,DBPV. 10:00 - 12:30 2.50 EVAL P OTHCMP MAKE UP CT RISER AND TEST QTS TO 250/ 3500 PSI,GOOD. RIH WITH BHA#12. 12:30 - 14:10 1.67 EVAL P OTHCMP WAIT AT 9000 FT JUST ABOVE LINER TOP FOR CEMENT TO REACH 500 PSI COMPRESSIVE STRENGTH. Printed 2/25/2013 11:08 42AM North America-ALASKA-BP Page 3 of 6 Operation Summary Report Common Well Name:06-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/7/2013 End Date:2/11/2013 X3-012GW-C:DRILL(1,570,234.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:9/15/1982 12:00:OOAM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°14'39.352"2 Long: 0148°29'51.297"W Active datum:orig rkb=74©74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:10 - 15:25 1.25 EVAL P OTHCMP CEMENT IS AT 500 PSI COMPRESSIVE STRENGTH. INCREASE RATE TO 1.19 BPM,RIH. WEIGHT CHECK JUST ABOVE LINER TOP IS 21K. NOTHING SEEN GOING IN LINER. PUMP CONTINUE PUMP MAX RATE OF 1.19 BPM,CLEANOUT TO PBTD AT 25-30 FT/MIN. 15:25 - 15:30 0.08 EVAL P OTHCMP REDUCE PUMP RATE AND SLOW DOWN TO 10 FT/MIN TAG WIPER PLUG. FIND PBTD AT 11,194 FT UNCORRECTED. PICK UP IS,CLEAN,TAG AGAIN,SAME SPOT. 15:30 - 18:15 2.75 EVAL P OTHCMP POOH. CONTINUE PUMPING FULL RATE OOH. NO SIGN OF ANY CEMENT RETURNS. 18:15 - 18:30 0.25 EVAL P 'OTHCMP FLOWCHECKAT SURFACE,PJSM FOR BHA. 18:30 - 20:30 2.00 EVAL P . OTHCMP STAND BACK INJECTOR,STAND BACK 30 STANDS OF CSH IN DERRICK LAY DOWN MOTOR AND MILL. 20:30 - 21:00 0.50 EVAL P OTHCMP CLOSE MASTER AND SWAB VALVES. LEAK TIGHT TEST OF SWAB. 21:00 - 00:00 3.00 EVAL P OTHCMP LOCKOUT/TAG OUT ACCUMULATOR OPEN UP BOPE RAM DOORS AND INSPECT ELEMENTS REPLACE TOP AND BLADE SEAL ON BLIND/SHEAR RAMS. 2/9/2013 00:00 - 06:00 6.00 BOPSUR P OTHCMP PRESSURE TEST BOPE PER ADWOP AND AOGCC REGULATIONS TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH.- PRESSURE TEST ANNULAR PREVENTER WITH 2"TEST JOINT-FUNCTION TEST KOOMEY ACCUMULATOR UNIT PER BP WELL CONTROL MANUAL AND NORDIC PROCEDURE. -TEST AND CALIBRATE GAS ALARMS. -FUNCTION ALL COMPONENTS FROM BOTH REMOTE STATIONS. -TEST WITNESS WAIVED BY AOGCC INSPECTOR CHUCK CHEIVE. -SEE ATTACHED DOCUMENTATION REPORT AND CHARTS. 06:00 - 07:00 1.00 BOPSUR P OTHCMP CLEAR RIG FLOOR. PREP TO RUN CSH AND MEMORY LOGS. 07:00 - 07:20 0.33 EVAL P OTHCMP PJSM WITH ALL CREWS FOR MAKING UP LOGGING BHA. 07:20 - 09:20 2.00 EVAL P OTHCMP MAKE UP LOGGING BHA WITH MCNL,1/2" CIRC SUB,5/8"DISCONNECT,30 STDS 1" CSG,3/4"DISCONNECT,DBPV. BHA OAL=1891.89 FT. 09:20 - 11:00 1.67 EVAL P OTHCMP MAKE UP CT SWIVELAND CT RISER. PRESSURE TEST QTS CONNECTION. RIH. STOP AT 2900 FT AND 9000 FT TO GET DEPTHS CORRELATED. 11:00 - 12:20 1.33 EVAL P OTHCMP LOG FROM 9000 FT DOWNWARDS AT 30 FT/MIN. TIME PERF PILL TO ARRIVE WHEN LOGGING TOOL IS AT TD. Printed 2/25/2013 11:08:42AM North America-ALASKA-BP Page 4 of d, Operation Summary Report Common Well Name:06-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/7/2013 End Date:2/11/2013 X3-012GW-C:DRILL(1,570,234.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time.9/15/1982 12:00:OOAM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UW:/Lat.070°14'39.352"2 Long: 0148°29'51.297"W Active datum:orig rkb=74 @74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:20 - 13:00 0.67 EVAL P OTHCMP TAG BOTTOM LIGHTLY AT 11193.5 FT, UNCORRECTED. CONSISTENT WITH YESTERDAY'S UNCORRECTED TAG OF 11194 FT. POOH LOGGING UPAT60 FT/MIN. LAY IN PERF PILL. STOP AT 8900 FT EOP AND FLAG PIPE FOR PERF RUN. CONTINUE LOGGING UPAT60 FT/MIN. 13:00 - 14:40 1.67 EVAL P OTHCMP STOP AT 9000 FT,DONE LOGGING HERE. TRIP SHEET IS-1 BBLS TO THIS POINT. FLOW CHECK HERE IS GOOD. CONTINUE POOH. CONDUCT PJSM WHILE POOH. TRIP SHEET IS-2 BBLS TO THIS POINT. LOAD PERF GUNS INTO PIPE SHED WHILE POOH. 14:40 - 16:50 2.17 EVAL P OTHCMP TAG STRIPPER. FLOW CHECK WELL IS GOOD. OPEN CT RISER,STAND BACK INJECTOR. STAND BACK 25 STANDS 1"CSH THEN CONDUCT PJSM WITH SLB MEM LOGGER FOR PULLING SOURCE. 16:50 - 17:20 0.50 EVAL P OTHCMP CLEAR RIG FLOOR,PREP FOR LINER LAP TEST. 17:20 - 18:00 0.67 EVAL P OTHCMP LINER LAP/INJECTIVITY TEST LOW PRESSURE TEST 250 PSI IS GOOD. GO TO 2400 PSI WITH 1.7 BBLS,BLEEDS BACK TO 2000 IN 10 SEC. PUMP AGAIN,INJECTIVITY IS 0.25 BPM @ 2380 PSI. SHUT DOWN AFTER 1 MORE BBL.PRESSURE BLEEDS OFF AGAIN. LINER LAP TEST FAILS. 18:00 - 18:30 0.50 PERFOB P OTHCMP CHANGEOUTAND PRE-TOUR CHECKS AND WALK AROUNDS 18:30 - 19:30 1.00 PERFOB P OTHCMP PREP FOR PERFORATING,LOAD GUNS AND EQUIPMENT TO RIG FLOOR 19:30 - 20:00 0.50 PERFOB P OTHCMP PJSM FOR PERFORATING 20:00 - 22:00 2.00 PERFOB P OTHCMP MU 12 PERF GUNS,1.56"6 SPF 1606PJ MU 29 STANDS OF 1"CSH 22:00 - 23:30 1.50 PERFOB P OTHCMP GET ON WELL PRESSURE TEST QTS TO 250/3500 PSI RIH WITH PERF GUNS 23:30 - 00:00 0.50 PERFOB P OTHCMP AT FLAG CORRECT TO 10,959'FROM MEMORY LOGGING RUN(-33'CORRECTION). TAG TD AT 11,160'. 2/10/2013 00:00 - 00:45 0.75 PERFOB P OTHCMP PJSM FOR PERFORATING. ARM E-FIRE HEAD. SHOOT PERFORATIONS FROM 10,900'-11,155'. CONFIRM GUNS FIRED WITH SHOT INDICATOR AND LOST RETURNS. 00:45 - 01:45 1.00 PERFOB P OTHCMP POH AT 28 FPM HOLDING 200 PSI BACK PRESSURE AT CHOKE. PUMP 0.8 BPM AT 1970 PSI. 01:45 - 03:10 1.42 PERFOB P OTHCMP FLOW CHECK ABOVE LINER,NO FLOW. POH AND TAG UP. 03:10 - 03:30 0.33 PERFOB P OTHCMP FLOW CHECK,PJSM FOR BHA. _ STAND BACK INJECTOR 03:30 - 05:30 2.00 PERFOB P OTHCMP LAY DOWN 29 STANDS 1"CSH Printed 2/25/2013 11:08:42AM mow North America-ALASKA-BP Page 5 of 6 Operation Summary Report ' Common Well Name:06-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/7/2013 End Date 2/11/2013 X3-012GW-C:DRILL(1,570,234.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°14'39.352"2 Long: 0148°29'51.297"W AZ:tiae datum:orig rkb=74 @74.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:30 - 06:00 0.50 PERFOB P OTHCMP PJSM FOR HANDLING PERF GUNS LAY DOWN E-FIRE HEAD,12 PERF GUNS CONFIRM ALL SHOTS FIRED. 06:00 - 06 30 0.50 PERFOB P OTHCMP CONTINUE UD PERF GUNS. ALL SHOTS FIRED. 06:30 - 07:20 0.83 PERFOB P OTHCMP OFFLOAD PERF GUN RUNNING EQUIPMENT. CLEAR RIG FLOOR,PREP TO RUN REMAINING 1"CSH OUT OF DERRICK. 07:20 - 08:30 1.17 PERFOB P OTHCMP PJSM FOR MAKING UP 1"CSH. MAKE UP 1"CSH STANDS THEN UD SINGLES TO OFFLOAD LATER. 08:30 - 10:30 2.00 PERFOB P OTHCMP ALL STANDS IN THE WELL,START UD SINGLES. • CONDUCT KICK WHILE TRIPPING DRILL WHILE UD SINGLES,ALSO LRS RIGS UP AND PT THEIR LINES, 10:30 - 10:40 0.17 PERFOB P OTHCMP ALL CSH LAID DOWN. CLEAR RIG FLOOR,PREP TO RUN NOZZLE FOR FREEZE PROTECT. 10:40 - 11:20 0.67 WHSUR _.P POST SPOT VAC TRUCK TO TAKE RETURNS FROM PITS. TAKE 100 BBLS OFF RIG FOR DIESEL DISPLACEMENT. 11:20 - 13:40 2.33 WHSUR P POST PJSM WITH LRS FOR PUMPING DIESEL. M/U NOZZLE AND DBPV FOR FREEZE PROTECT WELL. PRESSURE TEST QTS CONNECTION. RIH,LRS PUT 25 BBLS DIESEL IN WHILE RIH. FP FROM 2500 FT WITH DIESEL. TAG STRIPPER. CLOSE SWAB. OPEN CT RISER,REMOVE DBPV. 13:40 - 14:50 1.17 WHSUR P POST GET BACK ON WELL,CIRCULATE UNTIL N2 GETS RIGGED UP AND PT. 14:50 - 16:40 1.83 WHSUR P POST PT IS GOOD. PJSM THEN START PURGE OF REEL. ALLOW IT TO BLEED OFF. 16:40 - 17:15 0.58 WHSUR P POST PJSM FOR T-BAR IN BPV. MONITOR WELL FOR 10 MIN,STATIC. SET BPV WITH T-BAR. 17:15 - 20:00 2.75 WHSUR P POST PREP TO PULL CT ACROSS. INSTALL AND PULL TEST GRAPPLE PULL COILACROSS TOP AND SECURE TO REEL 20:00 - 21:45 1.75 WHSUR P POST LOWER 2"E-FREE REEL PICK UP 2-3/8"AND INSTALL IN REEL HOUSE. 21:45 - 23:30 1.75 WHSUR P POST SET DOWN INJECTOR,CHANGE PACK-OFF AND BRASS LOWER GOOSENECK 23:30 - 00:00 0.50 WHSUR P POST LEAK TIGHT TEST OF SWAB VALVE. 2/11/2013 00:00 - 03:00 3.00 WHSUR P POST CHANGE GRIPPER BLOCKS,STUFFING BOX, GOOSE NECK ROLLERS. CHANGE RAMS FROM 2"TO 2-3/8"ON BOPE. INSTALL GOOSENECK. 03:00 - 05:00 2.00 WHSUR P POST PJSM INSTALL AND PULL TEST GRAPPLE. PULL COILACROSS AND STAB PIPE.SET INJECTOR ON LEGS. 05:00 - 07:00 2.00 BOPSUR P POST PJSM ND BOPE Printed 2/25/2013 11:08:42AM North America-ALASKA-BP Page 6 OO Operation Summary Report Common Well Name.06-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/7/2013 End Date:2/11/2013 X3-012GW-C:DRILL(1,570,234.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:9/15/1982 12:00:00AM Rig Release:2/11/2013 Rig Contractor:NORDIC CALISTA UW:/Lat:070°14'39.3522 Long: 0148°29'51.297"W Active datum:orig rkb=74 @74.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 09:30 2.50 BOPSUR P POST NU AND TEST TREE CAP TO 250/3500 PSI. **RELEASE RIG AT 09:30 02/11/13.CONTINUE ON RON EVENT FOR 06-24B.** Printed 2/25/2013 11:08:42AM 06-22B, Well History (Post Rig Sidetrack) Date Summary 02/16/13 T/I/O=Vac/0/0 Conducted PJSM. Barriers= Swab, SSV, & BPV. Start barriers list. Ensured all tree valves were open to tree cap. With 0 psi. on tree,torqued all flanges to specs. Performed LTI on BPV& SSV..Pass. Removed comp. side untapped blind and replaced with tapped blind and chem. inj.jewelry. Torqued to specs. Performed LTI on Swab&SSV..pass. Removed tree cap, attached lubricator, PT'd against top side of Swab 250/Iow..3500/high..pass. PULLED 4"CIW"H" BPV#151 thru tree using 1-1' ext. Tagged @ 112". Shut barriers, C/O tools on lubricator, attached lubricator, PT'd against Swab&SSV 250/Iow..3500/high.. Pass. Set 4"CIW"H"TWC w/same equipment. Shut barriers, removed lubricator 0/0 tools, attached lubricator. Shell tested tree against TWC 250/low.. 5000/high. Pass (see chart in TRP folder) Pulled TWC. Removed lubricator, installed tree cap w/new 0-ring. 02/17/13 DRIFTED W/1.84"CENT, S.BAILER TO DEVIATION @ 10,596' SLM. RECOVERED 1 TABLESPOON OF METAL SHAVINGS. DRIFTED W/2.80" BARBELL W/2.75" LIB TO TOP OF 2-3/8" LNR @ 9500' SLM (9499' MD). RECOVERED IMPRESSION OF 2.70" DEPLOYMENT SLV&METAL SHAVINGS. SET BKR 35 KB LTP IN 2-3/8" LNR TOP @ 9500'SLM (9499' MD). SET 3-1/2" LTTP IN KB LTP @ 9489' SLM. PERFORM PASSING MIT-T TO 2000 psi W/TRI-PLEX. Page 1 of 1 Valli. BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-22 / Lat: 070°14'39.352"2 Long: 0148°29'51.297"W 06-22BPB1 Survey: MWD Survey Report - Geographic 14 February, 2013 Willi BAKER 0HUUGIES Survey Report-Geographic bp 1VTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-22 Project: Prudhoe Bay TVD Reference: 33:22 4/30/1993 00:00 @ 63.00usft(generic drilling rig Site: PB DS 06 MD Reference: 33:22 4/30/1993 00:00 @ 63.00usft(generic drilling rig Well: 06-22 North Reference: True Wellbore: 06-22BPB1 Survey Calculation Method: Minimum Curvature Design: 06-22BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 06,TR-10-14 Site Position: Northing: 5,941,880.59 usft Latitude: 70°14'46.529 N From: Map Easting: 684,674.88 usft Longitude: 148°30'29.22 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.40 ° Well 06-22 API No. 500292080600 Well Position +N/-S 0.00 usft Northing: 5,941,182.36 usft Latitude: 70°14'39.343 N +E/-W 0.00 usft Easting: 685,997.66 usft Longitude: 148°29'51.27 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 37.00 usft Wellbore 06-22BPB1 API no. 500292080670 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2012 1/25/2013 20.67 81 01 57,630 Design 06-22BPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10.100.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (') 26.00 0.00 0 00 63.24 Survey Program Date: 2/6/2013 From To ' (usft) (usft) Survey(Wellbore) Tool Name Description 89.00 9,289.00 1 :Camera based gyro multisho(06-22) CB-GYRO-MS Camera based gyro multishot 9,748.60 9,914.30 2:MWD-Standard(06-22A) MWD MWD-Standard 10,100.00 10,100.00 [Blind]-Telco(06-22A) BLIND Blind drilling 10,256.70 11,357.00 MWD(06-22BPB1) MWD MWD-Standard 2/14/2013 3:42:17PM Page 2 COMPASS 5000.1 Build 61 BKErR� Hl I 5 Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-22 Project: Prudhoe Bay TVD Reference: 33:22 4/30/1993 00:00 @ 63.00usft(generic drilling rig Site: PB DS 06 MD Reference: 33:22 4/30/1993 00:00 @ 63.00usft(generic drilling rig Well: 06-22 North Reference: True Wellbore: 06-22BPB1 Survey Calculation Method: Minimum Curvature Design: 06-22BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (0) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude sn 10,100.00 15.92 91.41 8,677.57 1,798.36 3,717.74 5,943,071.80 689,669.66 70°14'57.021 N 148°28'3.16 W' 10,256.70 15.92 91.41 8,828.26 1,797.30 3,760.70 5,943,071.80 689,712.64 70°14'57.010 N 148°28'1.91 W 10,274.13 17.56 86.20 8,844.96 1,797.42 3,765.72 5,943,072.04 689,717.65 70°14'57.011 N 148°28'1.76 W 10,300.99 22.71 80.61 8,870.17 1,798.53 3,774.88 5,943,073.38 689,726.79 70°14'57.022 N 148°28'1.49 W 10,330.00 28.16 76.51 8,896.36 1,801.04 3,787.08 5,943,076.20 689,738.91 70°14'57.047 N 148°28'1.14 W 10,360.18 34.88 70.68 8,922.08 1,805.57 3,802.17 5,943,081.09 689,753.88 70°14'57.091 N 148°28'0.70 W 10,390.29 39.73 64.94 8,946.03 1,812.50 3,819.02 5,943,088.43 689,770.56 70°14'57.160 N 148°28'0.21 W 10,424.73 46.54 53.33 8,971.18 1,824.66 3,839.07 5,943,101.08 689,790.31 70°14'57.279 N 148°27'59.63 W 10,450.31 51.93 49.97 8,987.88 1,836.69 3,854.24 5,943,113.49 689,805.17 70°14'57.397 N 148°27'59.19 W 10,480.24 58.45 47.00 9,004.96 1,852.98 3,872.61 5,943,130.23 689,823.14 70°14'57.557 N 148°27'58.65 W 10,510.31 64.62 44.49 9,019.29 1,871.43 3,891.52 5,943,149.14 689,841.58 70°14'57.739 N 148°27'58.10 W 10,540.30 70.26 41.44 9,030.79 1,891.70 3,910.38 5,943,169.86 689,859.93 70°14'57.938 N 148°27'57.55 W 10,570.37 76.89 38.24 9,039.29 1,913.84 3,928.83 5,943,192.45 689,877.83 70°14'58.156 N 148°27'57.02 W 10,600.28 83.51 35.56 9,044.38 1,937.40 3,946.51 5,943,216.43 689,894.92 70°14'58.387 N 148°27'56.50 W 10,630.24 89.82 33.86 9,046.12 1,961.97 3,963.53 5,943,241.42 689,911.33 70°14'58.629 N 148°27'56.01 W 10,666.79 89.91 37.74 9,046.21 1,991.61 3,984.91 5,943,271.57 689,931.97 70°14'58.920 N 148°27'55.38 W 10,690.21 90.83 40.23 9,046.06 2,009.81 3,999.64 5,943,290.13 689,946.25 70°14'59.099 N 148°27'54.96 W 10,720.39 88.99 42.88 9,046.11 2,032.39 4,019.66 5,943,313.20 689,965.70 70°14'59.321 N 148°27'54.37 W 10,750.55 88.31 46.60 9,046.82 2,053.81 4,040.88 5,943,335.13 689,986.38 70°14'59.532 N 148°27'53.76 W 10,779.79 88.19 50.54 9,047.71 2,073.14 4,062.79 5,943,355.00 690,007.81 70°14'59.722 N 148°27'53.12 W 10,815.41 90.03 53.79 9,048.26 2,094.98 4,090.91 5,943,377.53 690,035.38 70°14'59.936 N 148°27'52.30 W 10,840.41 91.44 57.38 9,047.94 2,109.11 4,111.53 5,943,392.16 690,055.64 70°15'0.075 N 148°27'51.70 W 10,870.37 91.78 59.40 9,047.10 2,124.81 4,137.03 5,943,408.48 690,080.75 70°15'0.229 N 148°27'50.96 W 10,901.47 92.61 62.41 9,045.91 2,139.92 4,164.18 5,943,424.25 690,107.52 70°15'0.378 N 148°27'50.17 W 10,930.57 90.77 65.31 9,045.05 2,152.73 4,190.29 5,943,437.70 690,133.30 70°15'0.504 N 148°27'49.41 W 10,963.33 87.69 67.40 9,045.49 2,165.86 4,220.29 5,943,451.57 690,162.97 70°15'0.633 N 148°27'48.54 W 10,989.21 89.82 69.82 9,046.05 2,175.30 4,244.38 5,943,461.60 690,186.82 70°15'0.725 N 148°27'47.84 W 11,021.13 90.00 74.04 9,046.10 2,185.20 4,274.72 5,943,472.24 690,216.90 70°15'0.823 N 148°27'46.95 W 11,050.16 90.83 76.80 9,045.89 2,192.51 4,302.81 5,943,480.24 690,244.80 70°15'0.894 N 148°27'46.14 W 11,080.06 92.33 75.02 9,045.07 2,199.78 4,331.80 5,943,488.23 690,273.60 70°15'0.966 N 148°27'45.29 W 11,109.98 91.50 72.52 9,044.07 2,208.14 4,360.51 5,943,497.29 690,302.09 70°15'1.048 N 148°27'44.46 W 11,141.42 88.62 70.78 9,044.04 2,218.03 4,390.35 5,943,507.92 690,331.67 70°15'1.145 N 148°27'43.59 W 11,169.98 91.53 68.08 9,044.00 2,228.07 4,417.08 5,943,518.61 690,358.15 70°15'1.243 N 148°27'42.81 W 11,199.96 90.21 65.90 9,043.54 2,239.78 4,444.67 5,943,531.00 690,385.44 70°15'1.359 N 148°27'42.01 W 11,230.16 93.13 64.93 9,042.66 2,252.34 4,472.12 5,943,544.23 690,412.56 70°15'1.482 N 148°27'41.21 W 11,260.32 90.83 62.36 9,041.62 2,265.72 4,499.12 5,943,558.27 690,439.23 70°15'1.613 N 148°27'40.43 W 11,290.22 92.58 62.20 9,040.73 2,279.62 4,525.58 5,943,572.82 690,465.33 70°15'1.750 N 148°27'39.66 W 11,320.20 95.44 61.38 9,038.64 2,293.76 4,551.93 5,943,587.60 690,491.33 70°15'1.889 N 148°27'38.89 W 11,357.00 95.44 61.38 9,035.15 2,311.30 4,584.09 5,943,605.94 690,523.04 70°15'2.061 N 148°27'37.95 W 2/14/2013 3:42:17PM Page 3 COMPASS 5000.1 Build 61 Frani BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-22 / Lat: 070°14'39.352"2 Long: 0148°29'51.297"W 06-22B Survey: MWD Survey Report - Geographic 15 February, 2013 • bp BAKER HUGIES Survey Report-Geographic by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-22 Project: Prudhoe Bay TVD Reference: 33:22 4/30/1993 00:00 @ 63.O0usft(generic drilling rig Site: PB DS 06 MD Reference: 33:22 4/30/1993 00:00 @ 63.O0usft(generic drilling rig Well: 06-22 North Reference: True Wellbore: 06-22B Survey Calculation Method: Minimum Curvature Design: 06-22B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 06,TR-10-14 Site Position: Northing: 5,941,880.59 usft Latitude: 70°14'46.529 N From: Map Easting: 684,674.88 usft Longitude: 148°30'29.22 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.40° Well 06-22 API No. 500292080600 Well Position +N/-S 0.00 usft Northing: 5,941,182.36 usft Latitude: 70°14'39.343 N +E/-W 0.00 usft Easting: 685,997.66 usft Longitude: 148°29'51.27 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 37.00 usft Wellbore 06-22B API no. 500292080602 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2012 1/25/2013 20.67 81.01 57,630 Design 06-22B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,690.21 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 26 00 0.00 0.00 63.39 L Survey Program Date: 2/8/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 89.00 9,289.00 1 :Camera based gyro multisho(06-22) C8-GYRO-MS Camera based gyro multishot 9,748.60 9,914.30 2:MWD-Standard(06-22A) MWD MWD-Standard 10,100.00 10,100.00 [Blind]-Telco(06-22A) BLIND Blind drilling 10,256.70 10,690.21 MWD(06-22BPB1) MWD MVVD-Standard 10,700.00 11,170.00 MWD(06-22B) MWD MWD-Standard 2/15/2013 4:39:22PM Page 2 COMPASS 5000.1 Build 61 Mild ,�� BHUGHES Survey Report-Geographic �'sa' bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-22 Project: Prudhoe Bay ND Reference: 33:22 4/30/1993 00:00 @ 63.00usft(generic drilling rig Site: PB DS 06 MD Reference: 33:22 4/30/1993 00:00©63.00usft(generic drilling rig Well: 06-22 North Reference: True Wellbore: 06-22B Survey Calculation Method: Minimum Curvature Design: 06-22B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,690.21 90.83 40.23 9,046.06 2,009.81 3,999.64 5,943,290.13 689,946.25 70°14'59.099 N 148°27'54.96 W 10,700.00 90.23 41.09 9,045.97 2,017.24 4,006.02 5,943,297.71 689,952.44 70°14'59.172 N 148°27'54.77 W 10,720.24 93.68 38.80 9,045.28 2,032.74 4,019.00 5,943,313.53 689,965.04 70°14'59.325 N 148°27'54.39 W 10,750.37 92.91 34.57 9,043.54 2,056.86 4,036.97 5,943,338.08 689,982.40 70°14'59.562 N 148°27'53.87 W 10,780.58 91.10 39.56 9,042.49 2,080.94 4,055.16 5,943,362.61 689,999.99 70°14'59.798 N 148°27'53.34 W 10,811.11 90.18 44.31 9,042.15 2,103.65 4,075.56 5,943,385.81 690,019.82 70°15'0.022 N 148°27'52.75 W 10,843.38 89.57 48.49 9,042.22 2,125.89 4,098.92 5,943,408.62 690,042.63 70°15'0.240 N 148°27'52.07 W 10,870.65 89.78 53.25 9,042.37 2,143.10 4,120.07 5,943,426.34 690,063.34 70°15'0.409 N 148°27'51.45 W 10,900.51 90.31 60.36 9,042.35 2,159.44 4,145.04 5,943,443.29 690,087.90 70°15'0.570 N 148°27'50.72 W 10,930.61 90.18 66.63 9,042.22 2,172.86 4,171.96 5,943,457.38 690,114.48 70°15'0.702 N 148°27'49.94 W 10,960.73 88.93 72.92 9,042.45 2,183.27 4,200.21 5,943,468.48 690,142.46 70°15 0.804 N 148°27'49.12 W 10,989.07 91.44 79.08 9,042.36 2,190.12 4,227.69 5,943,476.00 690,169.76 70°15'0.871 N 148°27'48.32 W 11,020.39 91.81 84.30 9,041.47 2,194.64 4,258.66 5,943,481.29 690,200.61 70°15'0.916 N 148°27'47.42 W 11,050.24 90.43 91.39 9,040.89 2,195.77 4,288.46 5,943,483.15 690,230.37 70°15'0.927 N 148°27'46.55 W 11,080.26 92.21 88.39 9,040.20 2,195.82 4,318.47 5,943,483.94 690,260.37 70°15'0.927 N 148°27'45.68 W 11,110.28 90.03 83.83 9,039.61 2,197.86 4,348.41 5,943,486.72 690,290.24 70°15'0.947 N 148°27'44.81 W 11,130.29 90.37 79.61 9,039.54 2,200.74 4,368.20 5,943,490.09 690,309.96 70°15'0.975 N 148°27'44.23 W 11,170.00 90.37 79.61 9,039.28 2,207.90 4,407.26 5,943,498.21 690,348.83 70°15 1.045 N 148°27'43.10 W Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 68.00 68.00 20" 20.000 26.000 2,508.00 2,508.00 13 3/8" 13.375 17.500 11,170.00 9,039.28 23/8" 2.375 3.000 11,157.35 9,039.36 LINER 1 2.375 3.000 Survey Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) , (usft) (usft) (usft) Comment 10,690.21 9,046.06 2,009.81 3,999.64 TIP 10,700.00 9,045.97 2,017.24 4,006.02 KOP 11,170.00 9,039.28 2,207.90 4,407.26 TD Checked By: Approved By: Date: 2/15/2013 4:39:22PM Page 3 COMPASS 5000.1 Build 61 w\l�j cs7 THE STATE Alaska Oil and Gas ti. �� 0fl`�L1`�1S� Conservation Commission -.9 GOVERNOR SEAN PARNELL 333 West Seventh Avenue O,. Q. Anchorage, Alaska 99501-3572 4LASY� Main: 907.279.1433 Fax: 907.276.7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 06-22B BP Exploration (Alaska), Inc. Permit No: 212-186 Surface Location: 584' FSL, 985' FEL, SEC. 02, T1ON, R14E, UM Bottomhole Location: 2957' FSL, 3660' FWL, SEC. 01, T1ON, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 41/ Daniel T. Seamount, Jr. Commissioner DATED this day of December, 2012. cc: Department of Fish 85 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATEOFALASKA RECEIVED ALA OIL AND GAS CONSERVATION COMA ,ON DEC 13 2012 PERMIT TO DRILL 20 AAC 25.005 n OGCC 1 a.Type of work. 1 b.Proposed Well Class: 0 Development Oil ' 0 Service-Winj 0 Single Zone . 1c Specify if well is proposed for: 0 Drill • 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates 0 Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name. 5.Bond 0 Blanket 0 Single Well 11.Well Name and Number: BP Exploration (Alaska)Inc. Bond No 6194193 ' • PBU 06-2213- 3. Address 6.Proposed Depth: 12 Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 11428'• . TVD 8986'ss• Prudhoe Bay/Prudhoe Bay . 4a.Location of Well(Governmental Section) 7.Property Designation(Lease Number): Surface. ADL 028311 • 584' FSL,985'FEL, Sec.02,T1ON, R14E, UM Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 2382' FSL,2725' FWL, Sec.01,T1ON, R14E, UM January 15,2013• Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 2957' FSL,3660' FWL, Sec.01,T1ON, R14E, UM 2560 . 43276' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: • 63' feet 15.Distance to Nearest Well Open Surface: x 685998 '• y-5941182 '• Zone- ASP4 GL Elevation above MSL: 37' feet to Same Pool: 600' 16.Deviated Wells. Kickoff Depth. -10245' feet • 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: - 92 degrees Downhole: 3249 • ' Surface. 2369• • 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# 13Cr80 STL 1918' 9510' 8050'ss 11428' 8986'ss 34 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured)* Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) 10681' • 9237' None • 10600' 9159' Unknown Casing Length Size Cement Volume MD ND Conductor/Structural 79' 20" 1910#Poleset 79' 79' Surface 2519' 13-3/8" 2200 sx Fondu,400 sx Permafrost'C' 2519' 2519' Intermediate 9297' 9-5/8" 500 sx Class'G', 300 sx Permafrost'C' 9297' 7915' Production Liner 3173' 7" 358 cu ft Class'G' 7508'- 10681' 6519'-9237' Scab Liner 5162' 7" 779 sx Class'G' 2348'-7510' 2348'-6521' Perforation Depth MD(ft): ' 10451'- 10502' Perforation Depth ND(ft): 9016'-9065' 20.Attachments. 0 Property Plat•®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report •®Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct. Contact Ron Phillips,564-5913 Printed Name John McMullen Title Engineering Team Leader Email Ron.Phdlips@bp.com fol TOtr.i, Mcfu-,NJ- Sig nature / -t ` /44.4 P- S Phone 564-4711 Date 1 2 - /7 - / 3- , Commission Use Only Permit To Drill API Number: Permit prov I a See cover letter for Number: ,1Q,113(,2 ' 50-029-20806-02-00 I "12011'7' other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas [/ contained shales: Samples Req'd ❑ es 121/No Mud Log Req'd: 0 Yes E Other. No 3(J J- 71-,-3ffo g 5-6 6 ip 5 1 � H25 Measures: es 0 No Directional Survey Req'd: 'Yes ❑ io Spacing exception req'd 0 Yes E "No inclination-only svy Req'd: 0 Yes No APPROVED BY i// ACOROVED N )� � . COMMISSIONER THE COMMISSION Date Form 10-60Ri e�Op s •• permit is valid for 24 months from the date of approval(20 AAC 25.005(g))` t and,Attachments In Duplicate c.�� VV V�1= l Zll 9l l �° �s t\ti To: Alaska Oil & Gas Conservation Commission From: Ron Phillips 0 by CTD Engineer Date: December 11, 2012 Re: 06-22B Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well 06-22B. CTD Drill and Complete 06-22B program: Rig Start Date: January 15, 2013 Pre-Rig Work: (scheduled to begin December 21st, 2012) 1. F MIT- IA to 3,000 psi, MIT-OA to 2,000 psi) 2. W Cycle LDS; PPPOT- T to 5,000 psi 3. C Set 48 bbl, 17 ppg cement plug in the 7" casing. Clean out down to 9,650'. 4. V PT MV, SV, WV. 5. S Drift tubing down to 9,650' with 2.75" centralizer. 6. F MIT-T to 2500 psi. (Wait 24 hours on compressive strength of cement.) Bleed wellhead pressures down to zero. 7. 0 Bleed production flow lines and gas lines down to zero and blind flange. 8. 0 Remove wellhouse, level pad. Rig Work: (scheduled to begin on January 15, 2013) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. P/I 4 2. Drill 2.75"pilot hole from top of cement at 9,650' down to 10,295' (50' Rat hole). 3 !2 - 47-8 3. Calliper Pilot hole using PDC logging conveyed on coil. 4. Run dummy whipstock drift. 5. Run and set 2-5/8" OH anchor whipstock at 10,245' (Top of Whipstock) • 6. Mill 2.74" window atl0,245' and 10' of rathole. 7. Drill Build: 3" OH, 391' (23 deg/100 planned) 8. Drill Lateral: 3" OH, 792' (12 deg/100 planned) with resistivity 9. Run 2-3/8" 13CR-80 liner leaving TOL at 9,510' MD 10. Pump primary cement leaving TOC at 9,650' MD, 6.6 bbls of 15.8 ppg liner cmt planned. 11. Make a liner cleanout run. 12. MCNL/GR/CCL log. 13. Test liner lap to 2,400 psi A r D 14. Perforate liner per asset instructions (-200') 2 12 "18 15. Freeze protect well, set BPV, RDMO Post-Rig Work: 1. Set 3-'/2" liner top packer, and test to 2,400 psi (if fails liner lap test) 2. Re-install wellhouse and FL's. 3. Generic GLV's Mud Program: • Milling/drilling: 8.6 ppg Geo Vis for milling window and drilling ( 686 psi over-balance ). Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. ' • All Class I wastes will go to Pad 3 for disposal. Hole size: 3" Liner Program: • 2-3/8", 4.7#, 13CR-80, STL Solid Liner 9,510' MD — 11,428' MD • A minimum of 7 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 9,650' MD) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 92°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line —43,276'. • Distance to nearest well within pool — 600'. Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/MCNL logs will be run. Perforating: • SWS 1 .56", 6 spf, perf guns, 1 " CSH work string, & 2-1/16" CSH • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • The 02-11A well bore is 613' away CTR-CTR at 11,256' MD Hazards • The maximum recorded H2S level on DS 6 was 300 ppm on well 06-14B on 5/12/2011.• Reservoir Pressure • The reservoir pressure on 06-22B is expected to be 3,249 psi at 8,800' TVDSS. (7.1 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,369 psi. - • An EMW of 8.4 ppg for this well will provide 595 psi over-balance to the reservoir. Ron Phillips CC: Well File CTD Engineer Sondra Stewman /Joseph Lastufka TREE= CIW WELLHEAD= FMC SAFE )TES: ***CHROME TBG&NIPPLES*** ACTUATOR= BAKER C 06-22A KB.ELEV= 63.0' BF.ELEV= I KOP= 2900' I II 2117' —13-1/2"HES X NIP, ID=2.813" Max Angle= 48°@ 6800' Datum MD= 10355' TOP OF 7"LNR -I 2348' 2348' _—19-5/8"X 7"BKR C-2 ZXP LTP, ID=6.290" Datum TVD= 8800'SS • 1-, 4 2365' 19-5/8"X 7"BKR FLEXLOCK LNR HGR, ID=6.350" I t ♦ . ♦ GAS LIFT MANDRELS 13-3/8"CSG,72#,L-80,ID=12.347" — 2519' 1 ST MD _ TVD DEV TYPE VLV LATCH PORT DATE t r ♦ 3 3230 3217 19 MMG DMY RK 0 11/21/11 . ♦ 2 5583 5116 38 MMG DMY RK 0 11/21/11 4 ♦ 1 7302 6377 46 MMG DMY RK 0 05/12/08 Minimum ID = 2.75" @ 9669' t ♦ 7372' —I 3-1/2"HES X NIP,ID=2.813" 3-1/2" PARKER SWN NIPPLE t ♦ 7392' —3-1/2"X 4-1/2"XO, ID=2.960" . ♦ ♦ 7397' —7"X 4-1/2"BKR PREMIER PKR,ID=3.875" I ill 11i♦ ♦ 7407' -I4-1/2"X 3-1/2"XO,ID=2.970" 7"LNR,26#,L-80 BTC-M, —I 7491' 0383 bpf,ID=6.276" 44 ' ' 7439' —13-1/2"HES X NIP,ID=2.813" 4 • (I 7"BOWEN CSG PATCH w/SEALS —1 7506' I— • •. 9087' -jTIW TYPE LG SEAL ASSY, ID=6.200" 7"LNR,29#,L-80, .0371 bpf,ID=6.184" —I 9087 9118' _ 9-5/8"X 7"TIW LTP w/TNV LNR HGR& TIEBACK SLV, ID=6.18" I TOP OF 7"LNR —1 9126' MILLOUT WINDOW(06-22A) 9297'-9347' 9-5/8"CSG,47#,L-80,ID=8.681" — 9297' A 9466' I—3-1/2"X 4-1/2"XO, ID=2.960" \ 4\ 9471' H7-1/2"117h/2"X41/2"BKR PREMIER PKR, ID=3.875" PERFORATION SUMMARY � 9483' H4-1/2"X 3-1/2"XO,ID=2.960" REF LOG:BHCS ON 05/03/93 ` N ANGLE AT TOP PERF:91°@ 10451' 9514' H3-1/2"HES X NIP, ID=2.813" Note:Refer to Production DB for historical perf data 9581' �7-1/2 X 3--11//2,','UNIQUE OVERSHOT SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8" 4 10451 -10461 0 07/04/94 9591' —3-1/2"PARKER SWS NIP, ID=2.813" 2-1/8" 4 10461 -10466 0 05/14/94 , 2-1/8" 4 10466-10474 0 04/27/94 9615' 7"X 32BKR SABL-3 PKR, ID=3.87" I lk 2-1/8" 6 10474- 10482 0 03/03/94 1. 9652' I—3-1/2"PARKER SWS NIP,ID=2.813" I 2-1/8" 4 10482- 10502- 0 11/16/93 44,, 11P- 9669' —3-1/2"PARKER SWN NIP, Nt ID=2.75" 3-1/2"TBG,9.2#,13CR-80 VAM TOP,.0087 bpf,ID=2.992" — 9566' ? FISH-HES BB 3-1/2"TBG STUB(05/06/08) —1 9569' PLUG ELEMENT (06/16/08) 3-1/2"TBG-IPC,9.3#,L-80 TDS,.0087 bpf,ID=2.992" —I 9681' I- 4 9681' I 3-1/2"WLEG 7"MKR JOINT —1 10266' I 4i� ID=2.992" �00%i* PBTD 10600' I - ';0•►► 9685' —;MD TT LOGGED \► 03/19/97 7"LNR,29#,L-80 NSCC, .0371 bpf,ID=6.184" - I 10681' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 09/30/82 ORIGINAL COMPLETION WELL: 06-22A 11/05/93 D16 RWO PERMIT No: 1930570 05/13/08 D16 RWO API No: 50-029-20806-01 04/30/09 AW/JMD DRLG DRAFT CORRECTIONS SEC 2,T10N,R14E,584'FSL&985 FEL 11/25/11 JLJ/JMD GLV C/O(11/16/11) 11/28/11 JLJ/JMD GLV C/O(11/21/11) BP Exploration(Alaska) ELLFEAD_ � V 06-22B 6_22B ( S OTES: ***CHROME TBG&MPPLES*** ACTUATOR= BAKER C KB.ELEV= 63.0' Pre-rig CTD Sidetrack BF.ELEV= I 1 KOP= 2900' , ' 2117' —13-1/2"HESX NP,D=2-813" Max Angle= 48°@ 6800' Datum MD= 10355' TOP OF 7"LNR H 2348' „, 2348' H9-5/8”X 7"BKR C-2 ZXP LIP,ID=6.290" Datum TVD= 8800'SS 11 2365' H9-5/8"X 7"BKR FLEXLOCK LNR HGR,ID=6.350" ��� GAS LFT MANDRELS ��� ST MD ND DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80,ID=12.347" H 2519' • ;�� 3 3230 3217 19 MMG DMY RK 0 11/21/11 4 1 �P 2 5583 5116 38 MMG DMY RK 0 11/21/11 • 0 1 7302 6377 46 MMG DMY RK 0 05/12/08 Minimum ID = 2.75" @ 9669' ��� 7372' —3-112"HES X NIP,ID=2.813" 3-1/2" PARKER SWN NIPPLE C4 7392' H3-1/2"X 4-1/2"XO,ID=2.960" 1 0 4 ‘A . 7397' —I7"X 4-1/2"BKR PREMIER PKR,ID=3.875" �i 7"LNR,26#,L-80 BTC-M, H 7491' ►• 7407' —I4-1/2"X 3-1/2"XO,ID=2.970" .0383 bpf,D=6.276" •" ,.l \ • 6 7439' H3-1/2"HES X NIP,ID=2.813" 7"BOWEN CSG PATCH w/SEALS H 7506' I ovj ivi 9087' HTIW TYPE LG SEAL ASSY,ID=6.200" iJ 7"LNR,29#,L-80,.0371 bpf,ID=6.184" H 9087' . 1.' ' �'� 9118' -5/8"X 7'TM/LTP w/TM✓LNR HGR& .119TEBACKSLV,D=6.18" •.4 .4. • 9466' —13-1/2'X 4-1/2'XO,ID=T 4/€=€'t`" MLLOUT WPIDOW(06-22A) 9297'-9347' ' 1 9471' —17-1/2"X 4-1/2"BKR PREMIER PKR,ID=3.875' TOP OF 7"LNR H 9126' •1 a 9483' H4-1/2"X 3-1/2"xo,ID=2 St'W.' r4 iv9-5/8"CSG 47#,L-80,D=8.681" H 9297• —J 9514' 3-112"HES X NIP,ID=2.813' 3-1/2"TBG,9.2#, 13-CR-80 VAM TOP.0087 9566' PERFORATION SUMMARY bpf,ID=2.992" REF LOG:BHCS ON 05/03/93 \% ANGLE AT TOP PERF:91°@ 10451' Note:Refer to Production DB for historical perf data ` 3-1/2"TBG STUB(05/06/08) H 9569' SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8' 4 10451-10461 O 07/04/94 2-1/e• 4 10461 -10466 O 05/14/94 9581' —I7-1/2"X 3-1/2"UNIQUE OVERSHOT 2-1/8' 4 10466-10474 0 04/27/94 Sk 2-1/8' 6 10474-10482 O 03/03/94 9591' H3-112"PA RKER SWS NIP,ID=2.813" 2-1/8' 4 10482-10502 O 11/16/93 • 9615' —17"X 3-1/2"BKR SABL-3 R�D=3.87" , \p- 9652' H 3-1/2"PARKER SWS NP,D=2.813" 1 \j 9669' -]3-1/2"PARKER SWN NP, D=2.75' "P. 9681' u*,; -' 3-1/2"TBG IPC,9.3#,L-80 a;*r OyTDS,_0087 bpf,I12.992" Top of cement pilot hole at 9,650' 4 4e ; 74r .111,` �1\1\10i► 7"LNR,29#,L-80 NSCC,.0371 bpf,ID=6-184' H 10681' DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDFIDE BAY INT 09/30/82 ORIGINAL COMPLETION 7/16/2012 JCL CTD Sidetrack WELL: 06-22A 11/05/93 D16 RWO PERMIT No:'1930570 05/13/08 D16 RWO API No: 50-029-20806-01 04/30/09 AW/A13 DRLG DRAFT CORRECTIONS SEC 2,T1ON,R14E,584'FSL&985 FEL 11/25/11 JLJ/JMD GLV C/O(11/16/11) 11/28/11 JLJ/JMD GLV CIO(11/21/11) BP Exploration(Alaska) 'TREE= CNV O 6_2 2 B SAFE- 1TES: ***CHROME TBG&NIPPLES*** WaFM • LFEAD= C ACTUATOR= BAKER C KB.ELEV= 63.0' Proposed CTD Sidetrack BF.aEV= ----- I' - KOP= 2900' ' I 211T —13-1/2"HES X NP,D=2-813" Max Angle= 48"@ 6800' Datum MD=— 10355' TOP OF 7"LNR — 2348' 2348' —19-5/8"X 7"BKR G2 ZXP LIP,ID=6.290" Datum TVD=—8800'SS ♦ or 2365' H9-5/8"X 7"BKR FLEXLOCK LNR HGR,ID=6.350" A . ,• GAS LFT MANDRELS ' ,• ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80,ID=12.347" H 2519' ' .• _ 3 3230 3217 19 MMG DMY RK 0 11/21/11 lj , 4 0. 2 5583 5116 38 MMG DMY RK 0 11/21/11 wA 1 7302 6377 46 MMG DMY RK 0 05/12/08 Minimum ID = 2.75" @ 9669' �' 7572' -I3-1/2"HES X NIP,ID=2.813" 3-1/2" PARKER SWN NIPPLE ; I 7392' H3-1/2'X 4-1/2"XO,ID=2.960' 1 ,•7397' H7"X 4-1/2'BKR PREMIER PKR,ID=3.875' 7'LNR,26#,L-80 BTC-M, —I 7491' . OA 7407' -14-1/2'X 3-1/2'XO,ID=2.970" .0383 bpf,ID=6.276' ',-' "I .• to 7439' --I3-1/2'HES X NIP,ID=2.813" 7"BOWEN CSG PATCH w/SEA LS H 7506' .' w' 9087'—1H TIW TY PE LG SEAL ASSY,ID=6.200' 7'LNR,29#,L-80, .0371 bpf,ID=6.184' H 9087' I , �� 9118' 9-5/8'X 7"TNV LTP w/TM✓LNR HGR& .e. TEBACK SLV,D=6.18' A. ii — 9466' H3-1/2"X 4-1/2"XO,ID=7 960' MLLOUT WINDOW(06-22A) 9297'-9347' 9471' —17-1/2"X 4-1/2'BKR PREMIER PKR,ID=3.875" I TOP OF 7"LNR H 9126' C9483' H4-1/2"X 3-1/2'XO,ID=2 H611" 9-5/8"CSG,47#,L-80,13=8-681" H 9297' A I 9514' 3-1/2'HES X NIP,ID=2.813' ------- .. -- PERFORATION SUMMARY \ 3-1/2"TBG,9.2#, 13-CR-80 VAM TOP.0087 N 9566' REF LOG:BHCS ON 05/03/93 \� bpf, ID=2.992" ANGLEATTOPPERF:91°@ 10451' Note:Refer to Production DB for historical perf data ` 3-1/2'TBG STUB(05/06/08) -H 9569' SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8' 4 10451 - 10461 0 07/04/94 2-1/8' 4 10461 - 10466 0 05114/94 9581' —17-1/2'X 3-1/2'UNIQUE OVERSHOT 2-1/8' 4 10466- 10474 0 04/27/94 2-1/8• 6 10474- 10482 0 03/03/94 At 9591' H3-1/2'PARKER SWS NIP,ID=2.813' 2-1/8' 4 10482-10502 0 11/16/93 Top of 2-3/8"chrome liner 9,510' Sil, 9615' H7"X 3-1/2"BKR SABL-3 PKR,D=3.87" 11� 9652' H3-1/2"PARKER SWS NP,D=2.813" \i 9669' —3-1/2"PARKER SWN NP, D=2.75" 9681' -,' 13-112"TBG IPC,9-3#,L-80 Top of liner cement 9,650' I 1 TDS,-0087 bpf,I2.992' Top of cement pilot hole at 9,650 3-1/2"Mono-bore Whipstock at 10,245' 44°,*' "• 1i 2-3/8"chrome liner with TD 16° ;,�► at 11,428' 7"LNR,29#, L-80 NSCC,.0371 bpf,ID=6.184' H 10681' DATE REV BY COMMENTS DATE REV BY COMuUJTS FRUDHOE BAY UNIT 09/30/82 ORIGINAL COMPLETION 7/16/2012 JCL CTD Sidetrack WELL: 06-22A 11/05/93 D16 MVO PERMIT No: 1930570 05/13/08 D16 R VO API No: 50-029-20806-01 04/30/09 AW/JND DRLG DRAFT CORRECTIONS SEC 2,T1 ON,R14E,584'FSL&985 FEL 11/25/11 JLJ/JMD GLV GO(11/16/11) 11/28/11 JLJ/JM) GLV GO(11/21/11) BP Exploration(Alaska) • a a. co 1 0 J cp Q � c •_ V _ Q o �, o _ co co V N It s v) W N m a W O � mmm `Hi; Z aaoo a m m = H 0-0Z Q • a //�� z m' 1.1 a Z MN = a 0 O s} o sr O Co 0 -ci-) co 0 C N vom NM N r) (7.) O V O)N xy �• OONV O OCV M — c' 0 CV 2 c o V"; 0 o —, +),„ U o eL co o 2 0 c a) m(Tu 01To' ° ' Zz > 0 9 a o • o UQ J v •• N f0 M f0 0 j N a) sr E m o co N 0 CO> 0d J O @ N a) E 2 C 0) 0) V a) 7 .°01 c co C C c15 co ❑ a) N N d 7 •� s7.. s. s 2 m H 2 W 2> > P2 = c o J J 0 a) a) 7 0 d C _ c D �a t — • JJ (7 C C o c o • H cd R c a E c 3 7 •i a) c CO ® o 0 a) R O o w o a) 0 uo) � a o 0 U � y .C >, )o E C - lC t S W LO W O 0 o O UM • >M 0 0 7 CO I) O V' O O E "" (Oo CO CO CO CO No v co Co O M OOo MM a0 Q tri '. 0 a) 00Et o 0) CO c .-. O) ci Q .- c ar G 4__ so I- E o s - o O O _ U isd W " o d 3 > o I- + cv CO ii) .. a w rn a) c ca mo E .g. m C 01 41 C N 4. W •p •L c L z o W W t a d • ..W •e z 73 9 o O z o z Q J a } N (n a) p W j toc` _ = C 0 O 0 ❑ ❑ g F- • 7 ! O. la .- CL N� E a E o v m ° E a oo m ZD a M m a x0 o a n a t • w Z CL 0 C) o 0. > I,-z 2 = N O O O a) Cl) m PO I— CV N0 O O 0 Q (.) CO00 O a) O O Q C CQ O U) m :: CO LO -0 CO a) 0 N N z U C. co 2 a c m7 m c) ca a a)N N a a o o Ti) m d coco o m°) a) m o E• mo CD -'e 2 E ❑ w -2 iri 0 2 co o C c Q Z a a 0 0 a r . C ii W a) NV 1IJOI= E v o c c ac m od ° to a 15 t= d QaDi •. a_ P 0 to as a a a c m ? ° o r• o O` C) 6) a) O` A d m O` 0 m C) 0 d R a) 0 m a) N. Z OQ. CO O a 202 j co co 3 3 a 3 a c < > > ^" N. O 0 0 O 0 0 0 M in Ca N O CO O = O O O O O r O M CO N W O N O ti 43 .rv. O O O O O 0 0) O O M M N (O C') O) O m :41) o 0 U V CO R CU co cO O O1 N Cn OO CC) a) r N O M M Is- 00CO C7o_ eaN r CO O M O CO M x- LO CO I� CO a M C I` CO 0O 4 O O t` N W n O O N CC) in CO I� N N N M a V a 0 0 0 .- 0 o N v v v v v v v v v v v v v v 0 0 o a > o a) O co 7 O. y7 0 Z Z o 0 0 O O o o o 0 0 0 0 0 0 J 7 < o o O o CO u) u7 Ca 010 CO 0 0 0 N co M 0 . ! O O O m N N N N N N N N N N N y 4 E m N N N N N N N CO CO N 7 '..W O a) Nh a) N O CO 0 CO a) M N 0) N N U .a CO N O CO C') CO CO M r 1- a) I` sr V C p a) CO 6 - V N M N N N O Cn w CO 0) 0 N M cocom Q) CO r r a) (O CO N 7- I. Is- N N CO a) W a) a) O 'a) 2 ,. _ ai 0) o) aS 0) 6) ai ai ai 6) ai ai ai o d •" Ca co co CO co co co co CO co co CO co a) C �- (O co CO CO CO CD CO CO CO CO 0 CO CO (0 a) O W is a •- • q co O C O i ` O V O 0 0 0 M 0 N M M M CO .� R 7 V h Cf) a-- 0 h 0 0 a0 p w d a7 U y E O O O O M u) N a O) 00 Cn Ca CO O d A R ZT N N r N r N Qf 0 a) CO CO N • re t y ,p C C O O O O O O O ' 1- x- N N N M 113, M M M M M M M M M M M co M M -.7, • 0 0 0 >,a o v a v v v v v v v v v v v v - 2 2 CO 0 v R `R a Cr) CO rn CD 01 0) CI) 0) Cf) CD CT) CD ) a) C N LS 17 C C z Cn CC) CC) CC) CO Cf) u) In CO u7 CO C() CO CC) -C OR m 0 n • a m u) v) Lo Cb C 0 u) CO 4 CC) N a) 0 M N 0 0> 0 M h a) sr a) V 0 N CO M 0 N Et 0 a) R > > 4 h N CO M M 'a N 6 0 In CO N co N M CO CO Cr) ' CO C f� N N f` t` ao aD 0 a) 0) O O C') M M M C') C') C) C') C') C) M H 0 U (I) CO a) CO 'a co a) N N N a a) N a) 0o co d• C10 N CO N 0 N N Cl CO a) 0 (p to CO (O (a O) ([') N a1 Cb M N N E 0 d) O) d) W a) 0 - N CO CO N N la a) CO Q' t` N. t` r t` r co co 00 a) a) 0) a) O co 2 >- N N a o m > > 2 0 2 2 N I co CO 'a co I� M 0 N- CC) CO a) N co a) N M 0 of O N (O co. O N- 0 Cp 4 O 4 M (O a) O N CM O O O) 0 (C) N O .- a) 0 C() 00 CO 00 CO I"- Cl) CO Is- N N 00 00 00 0) 0) 0) 0) O) 0) CA 0 o $ co- 00 03 0 0o co- W W 00 0o ao W 0 w � a > — 7N CO O O >..... N co co N co co O N u) O 0)1 V 7 . CO CD 0) 0) N U) 0 M CO CO O r".: O n - co 0 O N O N C a) a) a) a) co N Cf) 7 in In CO u) Cr) 'a . (a co m _ CO • R (' N Ni O *E) (o O N 0 co In 0 Z 02 o J F. •• N N N N M CA ' CO a) N 0 CO 00 N Q CO .- N 0 a) a) a) I� CO IN CO N CO O .- C/) 0 0 Ca G) 0 co co CU) CC L0 N 4 N O M 4 N N N 6) a T R 0 0 0 N N N co Ni- ' CO co a) 0 a) a) co QO 0 O .R 0 a0 O N v ON m C 0O . N -41 EOO F OOO to CO Ca 0 d LOcsilo 132NNC O ZZ a a o o a. Of o0 0 a) w Q O 0 0 0 �, O O O 0 0 0 0 0 o O o r-- ,,,i 0 O O c). O o O O ca co O O O O O N 0 0 0 CV Ill W d m oo ` o o O n ,0 0 Cri 0o CCi 0 o C0 w o 0 o (� Iomed= O E N 7 0 N N a N M M v v_ o (O 0 O O CO ai pie c ` p m e U) ❑ o fLo o Oo Co 0 0 0 0 0 o co 0 0 = d ay a a) aTi LL m — p�Y � W a .- ii,1- W r,.. 1- No OS F o .o:3 1,1" ma) a `R Z 0arn0 u) a • Cr, u O v ow O r CD O I- N N. - o m o m 0 rn a0 O CT) CO a 0 o CO o CO CO o of of 3 o a) coao co co 0 CO CO 0 CO CO CO a a) U O'C Mo, CO 0 W 1.1- "" C`7 C h O 0 O 01 N CK Ci) a) O CD CD CD CD O m m N V in M0_ Ca CD O V a) O N W CO Q MV M 4 4 M 4 M N I` 0 a O a pN O CO I-- O O O W W CD CD Z V1 = 0 Ca CO I,- r 00 CO T O O 7 N O a)in r 4 a a a O O O O 0 00 c 'a > 0 N O co 7 0 Ty r) co Z 0 0 0 0 0 0 0 0 0 0 0 J 0p 7 < 0 0 O O O 0 O Co O O 0 N as CO 0 N (N (N (N (N CV CV (N (N CV N N V. E tD CO CO N 7 7 0)C — caN C (NI a) C_ 2 J O Q) a) N O N V N 7 O N CO 0 C) .� M a) Nr O N. O N N N C O O N CO 7 CO r a) N O L w O 0 .- N NN N M sf O O II = O O O O O O O O O O a) a) a) a) a) a) a) a) a) 6) a) W W C "" O CD CD CD CD CD CD CD CD CO CD CO O O W d C of 0 as .0 O V d C C ,- V CO O N 7 U) CO CO V CO N O O 2 `7 11 [6 O co r O O O O O n O O 0 a) m 0 N CO 6 a W N O M N a) O N 0 "6 — w T Ca 01 M 07 O O 0 N N Cr) 0 O N = 0 C M CO a O O O LC) (D CD co r M M M M C') C) M M M M co O- ❑❑• ❑ c mNI- ._ v a v v a v m- a) v v v J F Z co ❑ O O O) O) O) a) O) O) O) a) 0) Z O O LL) O O O O O O O O 0 Q 4 CO nr CO O NO 7 CD 0 NCt m O W O N ,- c.) ,- M r CO O CO m O co CO O Q) N i (N CO N CO M ; ; ; M• NW 0) N IO oO OCd LoO n: cNi M CrCflNr O rrrN Cp CO.—. (Ni- N N N N N N N N N N a igZ O co co n Q) O CO a) t` r O 1 CO r 7 N O CO N r o a0 0 a) O N N M M 4 4 O O CO I` a0 co a0 00 a0 a0 a0 m a0 Cn (n a) m m a) a) m a1 a) O CD 0) " `c O CO CO CO CO 0o CO CA CO ao Wao -.a d I"nC �� x. a) I0 O N 0 CO CO 0 N N O fn 3 " n n O O O a0 a0 N CD CD ••• M CA m a0 O M O M O h 4 co O O O O CD CD O O d :.. COQ Y Ig CO 0 a CO 01 0) M M O CD Q o v v )n in O O O O) O) m Q1 O m 6 Q) O) a) a) co co co co oo co co co co co co co U T pp ▪ Co a) a] O C co 0 CV < 0 N L u) m 0 ❑ N N C 0 1 o COm CO CO @ CO Z Z 0 0 0 0 d A p OD Op O Op O O O V V . df 0 O O O O O O O O o O N W O O O O O Ca O O CO 0 W 0 N 0 O CD 0 0 N w p 3/6= CO CO a) 00 N N CO V' R MO E�� T ` co ❑ O o o '-- C r r `-- ❑ O 4= G y 12 01 C O m EO O « O O y (0 n Z Oa c/) O Q N. • • c n. N. mSI 4.5srN. C.) d N •i-O N N CD CO N O? N N N iIIIHN a)C 7 O) N O) O) CO M N ,Cr CV N IC) m •o O n O O n N CM N M M N O O J O N = Z Z Z Z Z 0 0 > CO 1.0 a) 0) N O N CO N N CD 41 st (n In O O '2 O` 'O CD CO CO n Co 7 a Ost sr sr 6 > 01 m CJ R CD 3 Z —I o Q 0 0 0 0 0 N 0 M V n IN n N N a) sr E O CO U) N 7 O C N - CO ., a) E 2 co 0 0 0 0 o o O ao 0 0 0 0 0 o co 0 0 0 0 0 0 0 >C a) co ` •C ❑ co O O N co N O O co CO CO CO st CO CO CO LO O s- n s- O O S. 2 CO I- 2 W st U) O (C M Cf) CO 4 4v in u) In st sf N (O C) N (7) (O a N 0 N IN IN N C!) N n M IN In IN M IN 0 In CD IN CD In 0 CD st s- Cl CO M s- M CO CO O O _ 0 IP CO CO LO CD 1.0CD LO C) CO sr- co CA '- U) r- O O st C) O O O O O O C 00 co aO O) CA 0) OO CA co CA CA CA CA C) CA 00 00 O) CA CA CD CD CO d CO CO CO CD CO CD CD CD CD CO CO CO CD CD CD CD CO CO CD CD CD CD CD C @ d t W 42 75 0 2 W c 0 a) y rn .6 0 0 0 0 o o rn o 0 0 0 0 o rn o 0 0 0 0 0 0 c CD v _R In In o o )D o 0 o 10 .6 1.0 O U) u) In 0 0 0 o 0 0 0 C) CD C O <f V N st O - (C sr ,- st O O O sr 0 O O st CO 'OL. C C) d C co (A CA n N n O sr co N M O CO Cl CO st CD 0 CD 0 CD n D ` C w V O CO r- CO CO a- CO CO In OD IC) O IN M n O CO CD O) L- IC) ' Cr) s- D - y V d C M N N M CV N M M sY O M co sr- sr st M M N ,-- sr st NI' st st sf st sr sr l _ 4,= CO CD O 0) CA O O O C D O Ca) CA O) O) CA CA O D) O O O) C) C) `,) ❑ re❑ .c 0) w Z O O In In ICD In IC) to In tri (C In In to In I() tri ui ICi tri 'xi U) In J o 1- 2 Z V) ❑ 0 ❑. a) Ct co In st IN N n st CI) M N 0 V n st 0 M CD IN 0 0 0 IN Cr) N CD CD CO O CO st N st - O C) O , N O CO M sr M CO IC) I0 CO M n n C) CO It) O CO CD Cb CO CD In Q) In N N N In st C 0 InI,- O Is 0 Cl 0 CD 10 CO 0 0 CD N NI' CD •I' N In M_ NI- ,— st oo st ,— NI- Cl_ CO O .- N 0 M_ CO CD n CD IN CD O) = _W .-W CO- IC) O) In M 4s-CuOO IO( O In CD W M sr- st sr- sr- sr- M F- + In In In co W coco w O n n n n O o O n O) N CO N CD Cl 0 n 0 N M st M N 0 IN CO st 00 st CO In O IN M In C) In CD O D) U')st n M .- O CA M CO CA n M O st CD n CD sr n co O O O CD O O O 0 OM O O O O 6O M O (C W CO s' In m 9 M Z O) co In O) In co (C M Z O) 0 CO 0 CO 0 CO Z CD (D O CD O CD Ca)M 0 N10 O CO I() CO IC) CD N N O s- n R O 'TN n O M CO CO N CO CO ) CT Z O r r r N z 0) N N M st M N CI) N cV N (+) cV N ,-Z co + (O 0 (O (C Q_ IN N W C) r- O r O CD a N ❑ a OCV 0) o.- 0 0 0 0 0 0 0 0 0! 0 0 0 0 0 0 0,- 0 0 0 0 0 0 0 0 O O0 0 0 0 0 0 st O 0 0 0 0 0 0 O O 0 0 0 0 0 0 O Co Co[ O co co oo ON co O) CO a, CO (O ON CO M CO CO O) CO N 2 co = a = x 0 O 2 O O 2 co O O o O o 0 O O 0 o= 0 0 0 0 0= O O co• M O co 0 0 O C D ❑ 0 NI: O O 0. • CO CO U) EL O m _ 0 m _o co = = Q CD N CD CO o Y0 co co O N O r- 0 N O N O C D g 00 0� 0 0o OCn d 00 O0o .60 (j0 O6i Q a) C >.. T T T T < 0 .o a a .0 0 T O. `a) m a) a) `m y0 ❑ c c c c c U m O U U U U L L 0 N m In a) a) a) U) N .0 1 ❑ N N C a7 En m En En FO 7 co co (D C) co r0 co Y6 ca Q Zaaooa a) Y CV CV a) .- N M sr 6 co M N a N . N M sr In CO a) r- N CO O co ' N C`) li 41i W d w N C C C C C C C a)N N C C C C C C C N C C C C C C C 1.1..L) p Mini= E w a) E o D o 3 E'E a E D D o D n E 'O 0 0 ) 5 E)E of Dile = . y Z c m LL c a a a a a F c.c (`�) = Ta a a a a a LL a a a a a ' C c co o m o m a CO o IO O = W n, 2 _ .o = a) ...r! .c cc) CO maO- mna CO TO. CO m E '-w 'w N I N N ' N N 0 0 N Z Ua u) � � a I- I- 0 co CD CO 0 .. N • M QI, c C. N O N V m U U) U) CD N (D 0 C O (O N O an M O O O C`) U) U) M No N. N O goN N N N M 0) ri d .- ,- a O N © => Z Z Z Z O o > N. (O (D a) O CO U) O) N O -p M r CD O O G) O O) cO N CO M _7 d in 10In sr > rn co U c � Z c C = < o o r- o N O M 0 N. N. r N CDV Eo co U) N 3 s- O C N O O O O O O O O O O O co O O O O O O N Cl) C O co o O U) d: 0 co N si O CO o O O o0 O O co 5 M I- W d st N. sr co M (O C 4 M st LC)CC o M ao C O O N. c0 N O) O O) O N. CD O st CO O O O M NU) M O O Q) U) (D M M W N CO CO O O O O O O O O O O O st O O O O O O O O O O O O 00 c0 c0 O O O O O O O CO U .. co co CO CO CO CO CO (D (D CO O O CO CO CO CO (O (D c �O `f .c w 2 d d ce C o .. � O O 0 0 0 0 0 0 0 0 O co 0 0 0 0 0 0 y p C co CD 0 CO O O O N N M O CO M U) O U) U) O U) U) U) O y ▪ U d c 3 O O O O M N O CV CV O N O st (D CV st N CO O E .-- M C U U) U) co sr N co co co ,- N co N O CD NI. CO 0 E ` c U M N N Nr CD r CO NI. N .- CD CO_ O r c0 O c0 = CO V d w U N sr sr sr sr sr sr sr sr sr � sr sr sr sr sr sr sr sr ❑ N Q' ce° L CD 00 U) �() U7 U7 U) U) U) U) O. U) U) U) tri U) U) U) U) L �!7 U O O r o I- 2Zco0 J CO N M = 0 C N y E Q I U o° a) ct O O O U) N (O 0 U) (D M sr U) N M N U) O CO M CO st (O O CO N U) (O N U) r CO O O r a) Ui r N CO CO v ri °i ri Ui Ui CO O ri 6 6 C C sr sr M N NI- CO U) U) st st O M N CO CO O N O a- a- at N (D (31 O c0 O (O M_ C) C) O N CO r) ❑ Ni dr. W NI: NI: st st st st M st sr" 'W ri ri NI, Ui st ri U) W in co co _Li N. N 0 N.N N N N M st O O N r) N N. O I- O U) N M N U) 0 0 O r O N c0 7 CO N st O CC)W N M N Is- 0 N O r CL n co in M in O M O U) r U)N O O O O N O O cc CO co O N. r M co NI- U) U) M N sr M Z U) CO co co U) O co Z O co sr M O CC M n O N U) U) CO U) U) CT N Z a-CD s- N N N N N a- a- N O s- N — co rn Z m a co g O O a- 40C1 O N o❑ 0 0 0 0 0 co co 0 O N O� 0 0 0 0 0 0 Z O 0 O j 0 0 0 0 0 0 0 0 O O I- 0 0 0 0 0 0 O O O 0 0 0 0 0 0 0 0 O❑ O O C C 0 0 0 . P-3 W co O 0o O 4 00 N. d 00 O O O 00 ✓ co (O 0 ❑ g• = 0 o O O O o 2 0 0 O= O O O Q O 0 Ern) O p 0 O 0 0 Q O O O O_ co U) co U) N d Ost f0 m f0 O IC CD O Q CD 10 0 r0 .0 CO Y gM gN g0 go r m. g W Q t j M O co O N C O ; CI Q .0 .0 .0 0 U T C) Cl) 0) U) O 0 0 C C C C '0 co E °� (0 0) u) m a) d t U) • N co 0 U U 0 3N a t -c ❑ N m in 01 O Cl)1 Cl)) y U -O N N c CO O O 2 CO (D (p 0 .CO :� .0. .0. 2 Q Z 0 d O O d w N N co V N N G y N co U) (o co �_ N # N N M d' U) (D N N 1111 46 W N.CO °Lo C c c c c c c c c 0)Ul .-. N c c c c c c c c N 1��= rn E Y T E 0.3 •a .a •5 .a .a .a .a rn E 5.E a).5 .a .a .a .a .a o !►\ >, m O Il d d 11 n. d CL n. m 0 0_ d a 0- d 0_ ° °) W� ` Fc•c ac > I- c•c Li- d c . Oa naD Oa coO �' d Q a a) co on mna CO c o in Li, £ O« _ _ .N N N (.1.i . , N u)co N U 7 r•- 0 aN � � O o CO CO 0 r\ • CO a m O CO 0 T.-CDcocoO N O N Oro co O Q C7 v a O N O • i O O O N O M 7 o_ > O O o J O 7 < N CO CO V , a3 N a) a Eco 0 (O (n CV 7 a- 0 C a� N 2 .� 2 2 c'7 F- W it; u C O eL d co 0) g re C d O OCjca C 'O C V ` 7 cc....- 0 C U _ U o p ` w o `7 omwreR T C Cr CD -0 u 0 0 r Z 2 0 0 0 0 0 00 0 o 7 co 0 0 0 0 0 0 0 0 J '2 Z to 0 O,^ o 0 o o 0 o o 0 O d a) IX J Q) 0 C (n JO >. 0 0 O m I— O O o) o o 0 U .J a) O N CO C N NY MI a) O) N _ a N. m O O >O O) 115 o a O c c o - 0 p_ a O H Y W a co W r- co co ,- F- O_ Q O N 0 (C) O 0 CO a s 0) a- N- CO C) s- O) O) 7 CO O O CO. N a- CO N r N a N O) r` 6 N O CO 00 COO) O N CO N O) a _ � r n r` CO O) O N CO a CO y W CO CO CO CO CO CO a a a a a a 10 t 0:1) C E 'a co O Z O 0 (O CO a a- r r N- CO N N 0 70 O CO CO a- CO N N O CA CO 0 0 C) (O O O 00 O O r` a N- C) O (O O (1) co O) a) C) N CO r O O 0 r` J n N r� CO co O) O ,- N CO CO CCI J o J Z 7 7 7 7 7 7 7 N N N N (V F- F- 0 O 0 H d + CO N N O m O F- N OY Q 0 0 0 0 0 0 0 O) 0 0 0 0 0 o O N- O a co N- 0 10 C) C) 0) 0) 0) (4) Ti t C) O) a N O Q) CO N CO a N O O Cl a- 0 n 0 J u a=' 0 0 W cc, O) r` O) co U L _ a a C) O) C) O O) N CO a (O i' O N- O CO CO r co co CD co Q m p co' C) Co ((i ao ao Co m C d CO ao rn rn CD rn rn CD CD rn > ) 0 ao ao (0 aD ao ao aD aD O (O (O Co co U T C co N m _ N- E• O O N- N- I- O r` 0 0 a 0 0 0 0 0 N- 0 0 0 0 0 0 ` _ O O O O O a 0 0 0 0 0 0 _C -C O N N O 7 C) � a C) CO O O 'C O O O O O (O O (O (O a0 3 O N N C y a.= a O co N O CO 7 G O a O CO O Cr) CO N O CO f6 16 0 co y $ N N CO a CO r CO m O N a Z Z d d O O d O O 0 0 0 0 0 0 W d 0 0 0 0 0 0 0 0 0 0 .- ,- ,- Q Ill IA O 2T N iii m N O ~Ct= c o rt of Ewe >, O C a) C ig Y QZ d a o• u _ a c) £ Q a) o Cal m H odm � aro Z 0o. in330 u- a 0 W 8N0 Pilau, 3glown t ,v, I CietD z . s .1' s a a .■ . F a n o S ' _ �o A + aq v m iF a ii IPP s IL 1., ■ o _ M■ ' o a - -- . _...- .. Ili a tV —1 hr N m oo ■ _, N - , _ -M O w - n`o� _ ■ � `1 c 0 -O n O v, n 8 n 8 "' a r m 0 8 0 N m 3 r r "� '�(ut�SL)(t)110J(-)u1noS r h a A CA--- -- — - O o P 1¢• ' 8 V it " ' g8 J.-25T w a,n �mm-- gp y y a 8 . 0 'n 83M;—.M;8848A m Tv el $o ,.; 1. 11888888888885 Vel, a - o g7IF 12,EE t ,....- = e,73.2m ; ; d aoo 1 ..� v0 X808888888888 taggc% Vm oo mRrR,' a Ey i _o a q o o 3t',63,V8'62r'888MV,=% ,,, e a . '3 y N , N N 5 o _— R' T esgim 8��'�8P'8 -, i � ffi m mmm k i c 0 88888"88888 o o 80Wg�ooWo�FBv I I m w m 1 1 E 1 N o " a m __ (um; Sb)t;;daci 1e"1-' A anii um IA W `M; m= om _ 03 Z cv 8 . `7 o N r r R ■ ■■■■■ F. g gy=m MUM. i 111111 E gi' ■■■ ■■ _ =is o AE ww ----$ _. o € ■ oN 1111111 , V , R J N O' ■■■■ g o gc w -� ■■■■■ ' a~ ■ ■■■■■ m `m VilL EMMEN ' q t-x 0.2 1 , 11111 - 1' e 1 I A ' , liriviii Il&iLY ,z i 1 E■■_ originalL bL l 6 I I ® �9 -1068 t mN M ■U \ 8800 0 amour ■■ '1° MEM�' N 3 a a a9r8 ■■ �n t.ECP ■■■■R 5a �_ ... _—___ II ■■■■55 ■ ■■■■■ ■■■■ • ■■■■■■ I • ■■■ ■ _: .....1111 �_�_ ■■■ 0 ...,, _a NE , • MIIIIIIIIIK 1 -rn * el A L:,`: A A A 2 2 5: F. A, A `2 ! g E el F E 5' 5 e § R 1 (uE/u OL) +)g11Ow-)q;nos g N MI �o 0 OnEWTM g m2 �3 888$$ x$$$ $$8 zg E,e Il g 3 3 D > F 3 mw N 2st - 1! c ...1%% wCN m ,_, ._,›> , s 3i 3533 f 5325 55 0.2 '' LIN! ,2,' riiiiLifilillidlEWillirnifflill g �w LIR o 37R8�^^ryryPW.$s8 j _ a3.-rR J !s e 2 2 1 2 a a 1 2 $2 21212222222222222222222 # ' o mmm-mamapA N ' ggoo 2sss2222222i2222222222.2 a222222222d2222222= yc a,w o cFY , , 4 , 1 + i 1 , , , f , 1 , 1 , f I , , 1 Y , , , , Y , , , 4 , Y , , + V M i 4 v a 2 AR'4414h'VN��'4 o ��s� s 3 n 0 cal m a N nmWo ggg f„ mamTSGP&I�RPS ry E zm ® €m .i"wm'�gomm<��$ a o �t�r6GG2A2�B 2 =ay$a �' y§ $ s$$$$$:$$8ag _$$$ $ ♦e m m g 0 O 0 0 -5 . ,..., _,------„_ Mill11111,1!!F S E c N 2� Os V rmC � � C N o^ m O 7 .Em. C \ a LLi O Lg Q AL of m o \ \\ cjc: W --p� J - \\v c (--_-__ _ m m N _ O Obi A (1.11.1. _�.'' K O M - O W O O r f] m m �1 � u H d 0:111!iiii!: • t N N v O o o 5. 2m ' j� C L N O N 3 R Q " Q)U�Ta a LLo \ c�J N (y F- Ro Xi N N BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-22 06-22B Plan 5 Travelling Cylinder Report 16 July, 2012 R4 laill BAKER 0 bp HUGHES Travelling Cylinder Report INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-22 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 06 MD Reference: 33:22 4/30/1993 00:00 @ 63.00ft(generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: 06-22 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 06-22B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 5 Offset TVD Reference: Offset Datum Reference Plan 5 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,100.00 to 11,428.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,340.20ft Error Surface: Elliptical Conic Survey Tool Program Date 7/16/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 89.00 9,289.00 1 :Camera based gyro multisho(06-22) CB-GYRO-MS Camera based gyro multishot 9,289.00 10,100.00 2:MWD-Standard(06-22A) MWD MWD-Standard 10,100.00 11,428.00 Plan 5(06-22B) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 11,428.00 8,986 09 2 3/8" 2.375 3.000 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 01 01-08-01-08A-01-08A 10,980.92 14,325.00 948.86 757.93 414.08 Pass-Major Risk PB DS 02 02-11A-02-11A-02-11A 11,255.94 12,300.00 612.66 788.84 -169.48 FAIL-Major Risk 02-21 -02-21B-02-21 B Out of range PB DS 06 06-03_DIMS-06-03-06-03 Out of range 06-03_DIMS-06-03A-06-03A Out of range 06-03A-06-03A-06-03A Out of range 06-05-06-05-06-05 Out of range 06-20-06-20-06-20 Out of range 06-20-06-20A-06-20A 10,384.62 11,393.00 1,147.16 1,093.05 68.79 Pass-Major Risk 06-20-06-20A-06-20A wp05 Out of range 06-22-06-22-06-22 10,107.30 10,125.00 86.61 55.94 30.95 Pass-Major Risk 06-22-06-22A-06-22A 10,250.00 10,250.00 0.02 1.78 -1.71 FAIL-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 7/16/2012 2:30:57PM Page 2 of 8 COMPASS 2003.16 Build 73 II * a; e s R /' E1 C r Q tl _ 8 =, a 11 9 u g 3 d ~ "ME e '08 w c y Y ° /V _ Q! -U I AI n v I ' — 1 a —1■ II I II : = vF Ym 0162 s Q c 1m o lir Ss — 1 , Q 9 2 11 21,, 1Qd I lit 6 .III eoI IJ I o Y I d _� > 11 . 11 LL I A I =o Z ^ °-� Ilik 111 1 I I II J Z I d2 80 O I '' > MN Il I. II.0 u E_ U U i ,3 •U 1 WLL Ili C re 3 ¢U •Irm I it II E EJ ♦ Iii v r W4. r 2 2 I nt �W lir I I t O U O 1_11!ali_- M �i ec li Fml°—'''; ii . < .... Q I v ✓ y I ' 0 1/ I re Z m 8 I 9z' in :: K¢ 1 d � ` Iii ou I to CB II S � * I '1 m E. �� eI (-0) u .. " I11 it�y,� III ~ i Z 1 11=11 �'G T OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME 6/-(1 06- 7_2 PTD# 2 ( 7 /g6_, Development Service Exploratory Stratigraphic Test Non-Conventional Well _ JL FIELD: POOL: ��'l Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 Ts N 0) o a) 0- (/) cn O p o N _ a) c • Q m 0 m C 0 O t CD (D o a cO > .c _c a ,r w co a Li p ad m E O a a) m 3 16 M N -C — "o O 0 0) O a N O - a U .5 a a -a _0 o_ �m a �_ 6 to CD c a) N a) > 0 w co m .. W m to g p N U > m >a -OC L) V) C H co > ,-- o RS 15 0 .O Nja3m O N a O ON V co OCOWN co N "O pa 3 .5 CD ` OC "o c co N 0 0 J in 0 = N a) 0 " 0 CO W H 0 U _a > C -0 o_ co O 0. o) "O 0 — m• 2 a) a) 0. D a C 3 0. N O. a) m N .0. N CO J Cll0 NIa. m N . m U 0 M U.. I CO C O N m O L 'o N 0 C N 0 a) a) = N m 0)0 0 W 0 U) a) N C 0) U) O' E '3 3 3 C OS = a a) oo m E N CO 0) 0 a (0 m -o a) N m p co CC F m a T U C Q .X Q m a = N Q. C d J a N _ a a) w , = v w n 6 E m T 'o w N a >- a) m — co co -o ate) .0_ >, a) — u) U) 0 Z Q` c m 3 N -5. c c 0 C V. m O. -o a 0 <0 N — N o W a' >-. N 'fn .N E a) ) N, (c0 U O) 7 N 0. 00. m 0 a) O p a o v co NCL) M a a) co m O a 2 a) a) c N m a N a) 3 a) -o Z a) p v co 0 3 U U _ CO Z r a E, E.. Z W a 0 .2 O. = 7. i0 co m 7. O a). 0 a N VJ,ca a s W O � W d) N E W a I a w a a > iiw a Q Q a) aa)) a) aa)) a) aa)) a) aa)) a) aa)) aa)) a) Q Q Q Q Q Q Q a) aN) a aa)) a) < aa)) a) aa)) m a) aa)) < o aa)) Q Q Q o_ z z >- >- >- >- >- >- >- >- >- >- >- >- Z Z Z Z Z Z z >- >- >- >- >- Z >- >- >- >- >- >- Z Z >- Z Z Z U) o m N N _. >, oN O N o (7, a)a3 10 c E 3 — E a) 0 0 C N "\� 00 a T 7 n' C L_ O a E o co 4t O c m _>' c0 (c) 0 a) M in _ 0 C C 5 O 0- p ° 0 -- > E N O W Q m 0 N tN CO 2 O O O. U) O O N > C O U a c 0 N N 7 v 3 .0 Q rj a) 0- _0 "O O CO cn c a) o) V a) m 0 •C' 0 -' U) 0 ca - O U 06 U N N N ca .N W 4_, O c pa a c - `o m N w 't c E N a > c E o m O 3 a) c. > C U) y0 3 O C N >� 1 0 co m 3 .c o- 3 0 Q > U N N fl o - n o O -g m N 3 co 7 W • •_ 'D 0 C 0 0 0 •c_ o m 0 0_ D O C a) m o 0 O a) a 'C c c N c. O O M = C c N H C O O a) IX C m •t �- N .0 a C C Q E E -o c c E O • > a 2 yi cn o o -O 3 O 'O c 3 O U }' ca a U C O a) N N >, O a Q a) w e -o U m N o o O m U 'o g ai a 3 ° > Y D Q o .0 0 a) a) c o - - ° o CO Y o o O m o m m m Q 'CO' 0 n ° o) o m .��-' a J E - " o a) .t .O 0 o a) C `) m - — m n Z o _ E S 3 a) 2 �) C m 3 m E a Q cc) N C N m 0 co O. 0_ 2 L -0 N m -o ate) N 2 N c N co co tp N U 0 `O N o N O N ._ N O W O o Z o Q o c N N _C,.:3 a) o m 3 3 > m m .. a '� 0 3 o N a 'Q 3 CO 3 o r Z 0 o 0 c O c '- 'O 'o 2 0_ "o 'o O a5 'E o O 0 O o c O" )O N •o N m O O) c "o a 0 3 a) -1=a, m 0 m O 0 a) a) o E a) E o CO c H OU d -o N N 0 3 3 �- V U a o a) a) -O a) CD -p m E o) O .cn :. 3 c O N O cb Q N .E N 0 m Oa Oa ) a) a U) U) a L -- 0 a m CO m m o) m O 0 `O) C U 3 N .O N O cn C L 'O U E m m m .0 7 7 cn CO O a) .D 2 c U) -o .N O a jL O . N C -O 0 'o U — C N .0 .0 I -0 L ate) !n m aa) N > o) as .0 a) N a .J N _° 0 O 00 .0 C N -CD E X C m E a) ) °) °: m 0 .0 c c " .3 m m m U) 3 0 N c o u m c a) c o as F W > w 3 3 m m m m m m E m cn 00 = a; _ , "O 02 1° — c U m N m U C N a o E N o 0 0 - aa)) a) a) E E c 3 n -300 ,Umt H H H g - g > = a a o U) 5 E m UE) m C as m Y m o a) ami 'c a) .) .) -o a s a) a) m a) — m 0 3 2 2 2 m a m -o `0 c O O L o N a) a) m a) a) o U czaJ2555cn � 00aa05Qa` 0cn0000Q4Q40mmO5 _ 2 a0cnco0 p a I N- O N M V LC) (D W 0) O N M A tO (0 r W O) O N M V' L2 (D 1,-,-; c0 6) E r r 0 � r N CO 'V' up O � coCA � � r <- � N N N N N N N N N N M M M M M M M M M M O _ _. C) N _ - - N ` O O O 0 5` O c w N a) N a) N U O 16 c6 m t6 O)U) coce O 0 p) 0 e- 0 — O (,) Q. N "r C r r 0 E .J N _ N 0) 0 C O W a E G u- C Q ; N 0 U > a a a W a LI a