Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout212-1907. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 06-24B Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-190 50-029-20822-02-00 12578 Surface Intermediate Liner Liner Liner 8923 2461 8106 1207 461 3189 10750 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 9030 33 - 2494 31 - 8137 7965 - 9172 9017 - 9478 9398 - 12573 33 - 2493 31 - 7678 7515 - 8549 8418 - 8797 8735 - 8925 12416 , unknown 2670 4760 7020 7500 10530 / 11160 107520 , 11330 , 12416 5380 6870 8160 8430 10160 / 10570 10388 - 12462 4-1/2" 12.6# 13Cr80 / L-80 29 - 9019 9024 - 8977 Conductor 79 20" 33 - 112 33 - 112 1490 470 4-1/2" Baker S-3 (2) 8297 , 8374 8850 , 8964 8297 , 8374 Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com (907) 564-5280 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 29 - 8354 299 698 29516 10629 252 1245 0 0 885 376 324-356 13b. Pools active after work:PRUDHOE OIL No SSSV 8850 , 8964 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:57 pm, Sep 27, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.09.26 15:18:59 - 08'00' Bo York (1248) RBDMS JSB 100324 DSR-9/27/24WCB 10-3-2024 ACTIVITYDATE SUMMARY 8/31/2024 CTU #1 - 1.50" Coil Job Objective: Drift/log, CIBP, 284' ExtAdperf Travel to locatoin, MIRU CTU, BOP test. Make up drift/log BHA with 2.2" GR/CCL carrier and 2.25" DJN. RIH and load well with 1% KCl w/ SafeLube. ....Job Continued on WSR 9-1-24.... 9/1/2024 LRS CTU #1 - 1.50" Coil ***Cont. from WSR 8-31-24*** Job Objective: Set CIBP, Extended AddPerf Continue RIH with Drift/log BHA. Tag in perfs at 11126' CTMD. Log up to 9300' painting tie-in flag at 10700'. POOH maintaining hole fill. Make up NS 2-7/8" CIBP and RIH. Correct depth at flag. Set CIBP at 10,750'. POOH maintaining hole fill. Perform no flow test L/D NS setting tool. Perform kick while tripping drill. M/U 284' of HES 2" Geo Razor guns. RIH, correct off CIBP and perforate 10,388'-10672'. POOH maintaining hole fill. L/D spent guns. Blow down reel in prepation for pipe swap. Rig down CTU. ...Continued on WSR 9-2-24... 9/2/2024 LRS CTU #1 - 1.50" Blue Coil ***Cont. from WSR 9-1-24*** Job Objective: Set CIBP, Extended AddPerf Complete Rig down of CTU. Travel to LRS Yard. ***Job Complete*** Daily Report of Well Operations PBU 06-24B CIBP and adperfs are correctly shown on WBS, below. -WCB g perforate 10,388'-10672'. POOH g Set CIBP at 10,750'. 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 06-24B Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-190 50-029-20822-02-00 ADL 0028311 12578 Surface Intermediate Liner Liner Liner 8923 2461 8106 1207 461 3189 11330 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 9036 33 - 2494 31 - 8137 7965 - 9172 9017 - 9478 9398 - 12573 3350 33 - 2493 31 - 7678 7515 - 8549 8418 - 8797 8735 - 8925 12416 , unknown 2670 4760 7020 7500 10530 / 11160 11330 , 12416 5380 6870 8160 8430 10160 / 10570 10955 - 12462 4-1/2" 12.6# 13Cr80 / L-80 29 - 90199032 - 8977 Conductor 79 20" 33 - 112 33 - 112 1490 470 4-1/2" Baker S-3 (2) No SSSV 8850 , 8964 8297 , 8374 Date: Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com (907) 564-5280 PRUDHOE BAY 7-20-2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 3:24 pm, Jun 19, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.06.19 14:50:43 - 08'00' Bo York (1248) 324-356 MGR06AUG24 Perforate DSR-6/21/24 10-404 SFD 6/25/2024*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.08.08 09:15:49 -08'00'08/08/24 RBDMS JSB 081324 06-24B EAP PTD:212-190 API: 500292082202 Well Name:06-24B API Number:500292082202 Current Status:Operable producer Rig:Coil Estimated Start Date:7/20/24 Estimated Duration:1.5 days Regulatory Contact:Carrie Janowski 564-5179 Permit to Drill Number 212-190 First Call Engineer:Jerry Lau (907) 564-5280 (O)(907) 360-6233 (M) Second Call Engineer:Dave Bjork (907) 564-4672 (O)(907) 440-0331 (M) Current Bottom Hole Pressure:3,251 psi @ 8,800’ TVD 7.3 PPGE | 9/09/16 offset well 06-01C Max. Expected BHP:3,350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure:2,470 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2,450 psi (Taken on 4/12/23) Min ID 2.31” ID @ 9382’ LTP Max Angle:91° Deg @ 10,663’ MD Tie In Log:SLB MCNL 03/03/2013 Brief Well Summary: 06-24B was a CTD sidetrack in March 2013 as a 2B lateral. The original perfs produced until 2015 when a plug was set for GSO of the toe perfs. Production again went HGOR in late 2019. Subsequently, a plug was set to isolate all existing perfs and add 186’ perfs up hole. A 2023 Plug mill was performed in conjunction with a toe oil lens add perf – production was competitive for 6+ months before becoming MGOR. In March 2024, all perfs were isolated with a plug, then 295’ of Z2B perfs were added. The LTP was changed out to suppress gas rates in April 2024. The well became HGOR in late May 2024. Now we look to move up hole. Objective: CT Set CIBP to isolate all existing perfs, add 284’ of Z2B perforations using the open hole deployment system. Procedure: Coiled Tubing Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 2. Load well with 1% KCL/SW down TBG. Max tubing pressure 2500 psi. This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS. add 284’ of Z2B perforations 06-24B EAP PTD:212-190 API: 500292082202 a. Wellbore volume to top perf = 155 bbls i. 4-1/2” Tubing – 9382’ X 0.0152 bpf = 143 bbls ii. 3-1/4” Liner – 1115’ X 0.0079 = 9 bbls iii. 2-7/8” Liner – 458’ X 0.0058 = 3 bbls b. 13Cr80 TBG from surface to TBG stub at 8931’ MD 3. MU and RIH with logging tools and drift BHA: 2” dmy gun & nozzle. 4. Flag pipe as appropriate per WSS for adperf/CIBP runs. 5. POOH and freeze protect tubing as needed. 6. Confirm good log data. 7. RIH w/ 2-7/8” CIBP, set @ 10,750’. 8. At surface, prepare for deployment of TCP guns. 9. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 10.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 11.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Only 1 run, which will be 295’ of loaded guns (no blanks). Perf Schedule Use 2” Maxforce guns or similar Perf Interval (RUN 1) Perf Length Gun Length Weight of Gun (lbs) 5.6 lbs/ft 10388 - 10672 284’284’1590 12. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 13. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 14. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 15. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 16. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 17. RDMO CTU. 18. RTP or FP well. Make up PCE. - mgr 06-24B EAP PTD:212-190 API: 500292082202 Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. Coil Tubing BOPE Schematic 4. Standing Orders for Open Hole Well Control during Perf Gun Deployment 5. Equipment Layout Diagram 6. Tie In Log 7. Sundry Change Form 06-24B EAP PTD:212-190 API: 500292082202 Current Wellbore Schematic 06-24B EAP PTD:212-190 API: 500292082202 Proposed Wellbore Schematic 06-24B EAP PTD:212-190 API: 500292082202 Coiled Tubing BOPs 06-24B EAP PTD:212-190 API: 500292082202 Standing Orders for Open Hole Well Control during Perf Gun Deployment 06-24B EAP PTD:212-190 API: 500292082202 Equipment Layout Diagram 06-24B EAP PTD:212-190 API: 500292082202 Tie In:SLB MCNL 03/03/2013 06-24B EAP PTD:212-190 API: 500292082202 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Operations Manager Date Operations Engineer Date 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 06-24B Extended Perforating , Set LTP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-190 50-029-20822-02-00 12578 Surface Intermediate Liner Liner Liner 8923 2461 8106 1207 461 3189 11330 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 9036 33 - 2494 31 - 8137 7965 - 9172 9017 - 9478 9398 - 12573 33 - 2493 31 - 7678 7515 - 8549 8418 - 8797 8735 - 8925 12416 , unknown 2670 4760 7020 7500 10530 / 11160 11330 , 12416 5380 6870 8160 8430 10160 / 10570 10955 - 12462 4-1/2" 12.6# 13Cr80 / L-80 29 - 9019 9032 - 8977 Conductor 79 20" 33 - 112 33 - 112 1490 470 4-1/2" Baker S-3 , 8850 , 8297 No SSSSV 8850 , 8964 8297 , 8374 Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com (907) 564-5280 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 29 - 8420 422 42361 172 0 0 985 324-080 13b. Pools active after work:PRUDHOE OIL 4-1/2" Baker S-3 , 8964 , 8374 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations 860 24392 488 820 By Grace Christianson at 8:16 am, Apr 24, 2024 Digitally signed by Eric Dickerman (4002) DN: cn=Eric Dickerman (4002) Date: 2024.04.23 12:46:15 - 08'00' Eric Dickerman (4002) RBDMS JSB 051225 WCB 7-16-2024 DSR-4/29/24 ACTIVITYDATE SUMMARY 3/20/2024 SLB CTU #9 / 1.75" CT - .156" WT / Scope: Set Plug, Ext. Adperf MIRU. Can't raise mast @ 1330. Continue MIRU other items. Raise the mast 18:00. Continue with BOP test. Complete BOP test, Pass. ***Job continued 3/21/24*** 3/21/2024 SLB CTU #9 / 1.75" CT - .156" WT / Scope: Set Plug, Ext. Adperf ***Job continued from 3/20/24*** MU NS MHA and HES memory gamma/CCL tool with 2.25" DJN. Depth Correction +27'. OE Agrees. Set NS CIBP @ 11330'. Circulate in KWF above Plug. Attempt PT on Plug, can't build Pressure above 200 psi. POOH keeping the hole full with KCL. Pump ***Job continued 3/22/24*** 3/22/2024 SLB CTU #9 / 1.75" CT - .156" WT / Scope: Set Plug, Ext. Adperf ***Job continued from 3/21/24*** MU NS MHA and swivel. PT to 3500 psi. Standby for Fire and Gas techs to Get H2S / LeL alarms dialed in. Alarms operating correctly. SB for Guns and Crane from LRS Unit 1 until 1330. Kill well with 230 bbls 1% KCL. 4.5 bbl/min @ 1725 psi. PJSM, KWT Drill with Crew for Safety Joint Deployment. PU 2" HES MaxF Guns, 6 SPF, 60* Phasing, 295'. RIH and tag CIBP at 11,330', correlate to bottom shot. PUH and shoot 10,955-11,250'. POOH keeping the hole full. ***Job Continued 2/23/24*** 3/23/2024 SLB CTU #9 / 1.75" CT - .156" WT / Scope: Set Plug, Ext. Adperf ***Job continued from 3/22/24*** Finished POOH with perf gun. All shots fired. FP the well with 4 bbls 60/40 meth and 37 bbls diesel. RDMO SLB discounted $7530 for Q-03 cleanup. ***Job Complete*** 3/31/2024 ***WELL FLOWING ON ARRIVAL*** (Caliper) POLLARD #60 STBY FOR SNOW REMOVAL ***CONTINUE ON 4/1/24 WSR*** 4/1/2024 ***CONTINUED FROM 3/31/24 WSR*** (Caliper) RAN 2.24" CENT, 10' x 2.16" DUMMY GUN & 1.75" SAMPLE BAILER TO DEVIATION AT 9,706' SLM LOGGED HES 24 ARM CALIPER f/ 9711' SLM - SURFACE T-BIRD LOADED TBG W/ 225 BBLS CRUDE SET 2-7/8" XX-PLUG AT 9,399' MD ***CONTINUE ON 4/2/24 WSR*** 4/1/2024 T/I/O = 2453/1013/0 Temp = SI (Assist SL with Load & Test) FP FL with 5 BLBS 60/40 and 85 BLS Crude, Load TBG with 225 BBLS Crude, JOB CONTINUES ON 04- 02-24 Daily Report of Well Operations PBU 06-24B yg Set NS CIBP @ 11330'. g shoot 10,955-11,250'. Daily Report of Well Operations PBU 06-24B 4/2/2024 ***CONTINUED FROM 4/1/24 WSR*** (Caliper) T-BIRD ATTEMPTED MIT-T TO 2500 psi (TBG pressure suddenly dropped off from 750 to150 psi after pumping 27 bbls) SET 45 KB LTTP AT 9,382' MD (T-bird attempted pressure test, unable to get up to pressure) RAN 4-1/2" D&D HOLE FINDER TO TOP OF LTTP AT 9,382' MD (pressure holding) PULLED 45KB LTTP @ 9382' MD PULLED 2.31" XX PLUG @ 9399' MD PULLED 45KB LTP @ 9382' MD (missing element on pkr, everything else looks good) DRIFTED TBG TO DEPLOYMENT SLEEVE @ 9398' MD w/ 4-1/2" BRUSH & 3.70" 3 PRONG WIRE GRAB (no recovery) ***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED*** 4/2/2024 JOB CONTINUES FROM 04-01-24 Assist SL with testing, Pumped 46 BBLS DSL for testing Pollard SL in control of well upon TFS departure FWHPS = 200/980/0 4/9/2024 T/I/O=2450/943/0 Temp= SI (Assist Slickline) Pumped 3 bbls of 60/40 followed by 226 bbls of crude to load TBG for slickline while they brush. Well left in in control of slickline upon departure 4/9/2024 *** WELL S/I ON ARRIVAL *** WELL CONTROL DRILL ( O-RING BLOW OUT WHILE IN HOLE) BRUSH DOWN TO LTP @ 9,382' MD (LOAD TUBING 225-BBL OF CRUDE) RAN LTP DRIFT DOWN TO LTP 9,382 MD *** CONTINUE WSR ONTO 4/10/24 *** 4/10/2024 *** CONTINUED WSR FROM 4/9/24 *** SET 45 FLOWGARD LTP 9CHR W/ 2.31" X-NIPPLE (27' TO X-NIPPLE (OAL-28' 9"') MINIMUM ID = 2.31" IN LTP 9,382' MD, FAILED MIT-T SET 45 KB LTTP @ 9,343' SLM, MIT-T, GOOD TEST. EQ AND PULL 2.31" XX SET PX-PLUG AND PRONG @ 9,372' SLM, MIT-T (PASS) PULL PRONG, PX-PLUG @ 9,372' SLM *** WELL S/I ON DEPARTURE *** 4/10/2024 T/I/O=588/950/0 (Assist slickline/MIT-T) Pumped 142 bbls of crude down the TBG to attempt to pressure up to 2500 psi, Unable to achieve test pressure. Pumped 2 bbls of crude to test plug above LTP to 2500 psi. ***MIT-T PASSED*** Pumped 2.5 bbls of crude down the TBG to MIT-T MAP @ 2500 psi. Reached test pressure at 2504 psi. Fiirst 15 minutes TBG lost 104 psi. Second 15 minutes TBG lost 34 psi. ***MIT-T PASSED***. Bled back 1.5 bbls of crude of TBG for slickline to pull plug. Well left in control of slickline upon departure g) SET 45 KB LTTP AT 9,382' MD (T-bird attempted pressure test, unable to get up to pressure)) RAN 4-1/2" D&D HOLE FINDER TO TOP OF LTTP AT 9,382' MD (pressure holding) PULLED 45KB LTTP @ 9382' MD@ PULLED 2.31" XX PLUG @ 9399' MD@ PULLED 45KB LTP @ 9382' MD (missing element on pkr, everything else looks good) () BRUSH DOWN TO LTP @ 9,382' MD (LOAD TUBING 225-BBL OF CRUDE)@( RAN LTP DRIFT DOWN TO LTP 9,382 MD SET 45 FLOWGARD LTP 9CHR W/ 2.31" X-NIPPLE (27' TO X-NIPPLE (OAL-28'( 9"') MINIMUM ID = 2.31" IN LTP 9,382' MD, FAILED MIT-T) SET 45 KB LTTP @ 9,343' SLM, MIT-T, GOOD TEST.@ EQ AND PULL 2.31" XX SET PX-PLUG AND PRONG @ 9,372' SLM, MIT-T (PASS)@ PULL PRONG, PX-PLUG @ 9,372' SL 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 06-24B Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-190 50-029-20822-02-00 ADL 0028311 12578 Surface Intermediate Liner Liner Liner 8923 2461 8106 1207 461 3189 12416 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 8996 33 - 2494 31 - 8137 7965 - 9172 9017 - 9478 9398 - 12573 2470 33 - 2493 31 - 7678 7515 - 8549 8418 - 8797 8735 - 8925 12416 , unknown 2670 4760 7020 7500 10530 / 11160 12416 5380 6870 8160 8430 10160 / 10570 11454 - 12462 4-1/2" 12.6# 13Cr80 / L-80 29 - 90199036 - 8977 Conductor 79 20" 33 - 112 33 - 112 1490 470 4-1/2" Baker S-3 (2) 8850 8297 No SSSSV 8850 , 8964 8297 , 8374 Date: Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com 907-564-5280 PRUDHOE BAY 3-15-2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov 324-080 By Kayla Junke at 3:28 pm, Feb 14, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.02.12 14:55:11 - 09'00' Bo York (1248) Extended Perforatingg SFD 2/15/2024MGR01MAR24 10-404 Perforate DSR-2/14/24*&: Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.03.04 10:40:25 -09'00'03/04/24 RBDMS JSB 030524 06-24B PTD:212-190 API: 500292082202 Well Name:06-24B API Number:500292082202 Current Status:Cycle Well, Operable Rig:Coil Estimated Start Date:3/15/24 Estimated Duration:1.5 days Regulatory Contact:Carrie Janowski 564-5179 Permit to Drill Number 212-190 First Call Engineer:Jerry Lau (907) 564-5280 (O)(907) 360-6233 (M) Second Call Engineer:Dave Bjork (907) 564-4672 (O)(907) 440-0331 (M) Current Bottom Hole Pressure:3,251 psi @ 8,800’ TVD 7.3 PPGE | 9/09/16 offset well 06-01C Max. Expected BHP:3,350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure:2,470 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2,450 psi (Taken on 4/12/23) Min ID 2.37” ID @ 9384 45 KB LTP Max Angle:118° Deg @ 12503’ MD Tie In Log:SLB MCNL 03/03/2013 Brief Well Summary: 06-24B was a CTD sidetrack in March 2013 as a 2B lateral. The original perfs produced until 2015 when a plug was set for GSO of the toe perfs. Production again went HGOR in late 2019. Subsequently, a plug was set to isolate all existing perfs and add 186’ perfs up hole. An increasing GOR trend indicated a potential leaky LTP in 2021 and a PPROF was run for confirmation. Subsequently, the LTP was reset and a plug was set to shut off gas. A 2023 Plug mill was performed in conjunction with a toe oil lens add perf – production was competitive for 6+ months, but now the well is near marginal GOR. Only 1/3 rd of the lateral has been played out. The plan forward is to move uphole. Objective: CT Set CIBP to isolate all existing perfs, add 295’ of Z2B perforations using the open hole deployment system. Procedure: Coiled Tubing Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 2. Load well with 1% KCL/SW down TBG. Max tubing pressure 2500 psi. This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS. 06-24B PTD:212-190 API: 500292082202 a. Wellbore volume to top perf = 158 bbls i. 4-1/2” Tubing – 9382’ X 0.0152 bpf = 143 bbls ii. 3-1/4” Liner – 1115’ X 0.0079 = 9 bbls iii. 2-7/8” Liner – 957’ X 0.0058 = 6 bbls b. 13Cr80 TBG from surface to TBG stub at 8931’ MD 3. MU and RIH with logging tools and drift BHA: 2” dmy gun & nozzle. 4. Flag pipe as appropriate per WSS for adperf/CIBP runs. 5. POOH and freeze protect tubing as needed. 6. Confirm good log data. 7. RIH w/ 2-7/8” CIBP, set @ 11,325’. a.Consider nose cone on CIBP to for LNR entry 8. At surface, prepare for deployment of TCP guns. 9. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 10.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 11.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Only 1 run, which will be 295’ of loaded guns (no blanks). Perf Schedule Use 2” Maxforce guns or similar Perf Interval (RUN 1) Perf Length Gun Length Weight of Gun (lbs) 5.6 lbs/ft 10955 - 11250 295’295’1652 12. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 13. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 14. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 15. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 16. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 17. RDMO CTU. 18. RTP or FP well. Make up PCE. - mgr 06-24B PTD:212-190 API: 500292082202 Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. Coil Tubing BOPE Schematic 4. Standing Orders for Open Hole Well Control during Perf Gun Deployment 5. Equipment Layout Diagram 6. Tie In Log 7. Sundry Change Form 06-24B PTD:212-190 API: 500292082202 Current Wellbore Schematic 06-24B PTD:212-190 API: 500292082202 Proposed Wellbore Schematic 06-24B PTD:212-190 API: 500292082202 Coiled Tubing BOPs 06-24B PTD:212-190 API: 500292082202 Standing Orders for Open Hole Well Control during Perf Gun Deployment 06-24B PTD:212-190 API: 500292082202 Equipment Layout Diagram 06-24B PTD:212-190 API: 500292082202 Tie In:SLB MCNL 03/03/2013 06-24B PTD:212-190 API: 500292082202 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Operations Manager Date Operations Engineer Date 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 06-24B Replace Liner Top Packer Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-190 50-029-20822-02-00 12578 Surface Intermediate Liner Liner Liner 8923 2461 8106 1207 461 3189 11800 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 9034 33 - 2494 31 - 8137 7965 - 9172 9017 - 9478 9398 - 12573 33 - 2493 31 - 7678 7515 - 8549 8418 - 8797 8735 - 8925 Unknown 2670 4760 7020 7500 10530 / 11160 11800 , 12416 5380 6870 8160 8430 10160 / 10570 11454 - 12462 4-1/2" 12.6# 13Cr80 / L-80 29 - 9019 9036 - 8977 Conductor 79 20" 33 - 112 33 - 112 1490 470 8850, 8280 Bo York Operations Manager Ryan Thompson Ryan.Thompson@hilcorp.com (907)564-5280 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final 13.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 4-1/2" Baker S3 Packer 29 - 8420 8964, 8374 N/A N/A 395 440 45953 19003 219 362 524 505 1000 413 N/A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2021 Submit Within 30 days or Operations Sr Res Eng: 4-1/2" Baker S3 Packer No SSSV Installed 8850, 8964 8280, 8374 By Meredith Guhl at 11:18 am, Dec 10, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.12.10 10:14:25 -09'00' Bo York SFD 12/15/2021 RBDMS HEW 12/13/2021 MGR18JAN2022 DSR-12/10/21 ACTIVITY DATE SUMMARY 10/22/2021 CTU 9 1.75" CT Job Objective: PPROF and set CIBP, Contingent Caliper Well flowing on arrival. MIRU. Perform weekly BOP test. Develop leak on BOP hydraulic hose on pipe ram open connection - leaking BOP test fluid (diesel). Develop air leak going to ops cab, under unit - unable to fix in field. Rig down unit & head to shop. ***Job in Progress*** 10/23/2021 CTU 9 1.75" CT Job Objective: PPROF and set CIBP, Contingent Caliper Swap out BOPs and repair air line at the shop. MIRU on 06-24. Perform weekly BOP test. RIH w/ 2.25" drift BHA to 11458ft. POH for logging tools. ***Job in Progress*** 10/24/2021 CTU 9 1.75" CT Job Objective: PPROF and set CIBP, Contingent Caliper RIH w/ HES logging BHA. Make dynamic passes at 80/60/30 as well as stop counts in 200' incriments from top of liner to 10450. Complete PPROF and drop down to 11400 and log up to 8700'. Flag pipe at 11300. Do one additional stop count at 9200'. POOH. Trim 100' of pipe and make up 2.300" diamond parabolic milling assembly. Log shows a +32' correction, making corrected EOP at flag = 11,224.23' after trim. RIH to 12000ft w/ no issues. POH. MU & RIH w/ CIBP. ***Job in Progress*** 10/25/2021 CTU 9 1.75" CT Job Objective: PPROF and set CIBP, Contingent Caliper Continue to RIH w/ TB CIBP. Set 2-7/8" CIBP ME at 11800'. POH. LD tools, recover ball. RDMO. ***Job Complete*** 11/27/2021 ***WELL S/I ON ARRIVAL*** (Pprof) RIG UP POLLARD #60 TO PULL & SET NEW LINER TOP PACKER. INNER SEAL ON WIRELINE VALVE SEAPING DURING PRESSURE TEST. LAY DOWN & TRAVEL TO SHOP TO RE-DRESS WIRELINE VALVE & TEST. ***WELL S/I & SECURED, CONTINUED ON 11/28/21 WSR*** 11/28/2021 ***CONTINUED FROM 11/27/21 WSR*** (Pprof) DRIFT TO LINER TOP PACKER AT 9,384' MD W/ 3.80" SWAGE (Clear ring from fish neck). PULL BAKER 45KB LTP (Missing bottom 5.53' & 2-1/4 Elements) FROM 9,365' SLM / 9,384' MD. ***LDFN, WELL S/I & SECURED, CONTINUED ON 11/29/21 WSR*** Daily Report of Well Operations PBU 06-24B Daily Report of Well Operations PBU 06-24B 11/29/2021 ***CONTINUED FROM 11/29/21 WSR*** (Pprof) DRIFT TO 9,373' SLM W/ 3.50" - 3 PRONG WIRE GRAB (No recovery). DRIFT TO 9,373' SLM W/ 4-1/2" BRUSH, 3.50" WIRE GRAB (No recovery). RAN 3.80" SWAGE, 3.50" L.I.B. TO 9,373' SLM (Impression of seal assembly). FISH 1-1/8" OF STL THREADS FROM 9,373' SLM W/ WFD RELEASABLE SPEAR. FISH 2-7/8" x 48" PIECE OF SEAL ASSEMBLY FROM 9,373' SLM W/ WFD RELEASABLE SPEAR. BOTTOM OF 2-7/8" SPLIT IN MULTIPLE SPOTS (Bottom 1.53' of seal assembly still missing). ***LDFN, WELL S/I & SECURED, CONTINUED ON 11/30/21 WSR*** 11/30/2021 ***CONTINUED FROM 11/30/21 WSR*** (Pprof) PLANT 3-1/2" x 2-7/8" RELEASABLE SPEAR IN REMAINING SEAL ASSEMBLY AT 9,378' SLM. FISH REMAINING 1.53' OF SEAL ASSEMBLY (Flow cut & pitted) FROM 9,378' SLM. ***LDFN, WELL S/I & SECURED, CONTINUED ON 12/1/21 WSR*** 12/1/2021 Assist Slickline by pumping 3 BBLS 60/40 followed by 225 BBLS Crude to Load well Slickline still on well upon departure 12/1/2021 ***CONTINUED FROM 11/30/21 WSR*** (Pprof) BRUSH SEAL BORE IN DEPLOYMENT SLEEVE W/ 4-1/2" BRUSH, 3.80" SWAGE. THUNDERBIRD LOADED TUBING W/ 225 BBLS OF CRUDE. RAN DUMMY 45KB LINER TOP PACKER W/ PTSA TO 9398' MD (tt marks indicate full insertion into polish bore) ATTEMPT TO SET 45KB LTP w/ PTSA (2.31" XX PLUG INSTALLED) IN DEPLOYMENT SLEEVE @ 9398' MD (after 2 dpu cyclyes, sheared off bait sub leaving dpu & ltp downhole, 26.75' oal lih) ***IN PROGRESS, JOB CONT. ON 12/2/21*** 12/2/2021 T/I/O= 700/450/0 (Assist Slickline) Pumped 4 bbls of 60/40 methanol followed by 14.6 bbls of 50* crude to achieve test pressure. Pressure test tubing to 2675 psi PASSED. Bled back ~9 bbls. FWHP=1050/450/0 Tag hung MV. IA/OA=OTG. Slickline in control of well upon departure. 12/2/2021 ***JOB CONT. FROM 12/1/21*** Pprof PULLED HES DPU FREE f/ LTP SET @ 9382' MD **LTP LIH IS 16.74' OAL** T-BIRD PRESSURE TESTED LTP TO 2500 PSI **PASS** (18.6 bbls crude pumped to achieve test pressure) PULLED 2.31" XX PLUG f/ LTP @ 9382' MD ***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED OF STATUS*** Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 11/10/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU 06-24B (PTD 212-190) PPROF 10/24/2021 Please include current contact information if different from above. Received By: 11/12/2021 37' (6HW By Abby Bell at 9:25 am, Nov 12, 2021 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 06-24B Milled CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-190 50-029-20822-02-00 12578 Surface Intermediate Liner Liner Liner 8923 2461 8106 1207 461 3189 12416 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 8996 33 - 2494 31 - 8137 7965 - 9172 9017 - 9478 9398 - 12573 33 - 2493 31 - 7678 7515 - 8549 8418 - 8797 8735 - 8925 12416 , unknown 2670 4760 7020 7500 10530 / 11160 12416 5380 6870 8160 8430 10160 / 10570 11454 - 12462 4-1/2" 12.6# 13Cr80 / L-80 29 - 9019 9036 - 8977 Conductor 79 20" 33 - 112 33 - 112 1490 470 4-1/2" Baker S-3 , 8850 , 8297 No SSSV 8850 , 8964 8297 , 8374 Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com 907.564.5280 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 29 - 8420 343 495 21648 16412 3 495 0 0 806 822 N/A 13b. Pools active after work:PRUDHOE OIL 4-1/2" Baker S-3 , 8964 , 8374 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:44 pm, Jun 29, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.06.29 12:56:56 -08'00' RBDMS JSB 072723 DSR-6/29/23WCB 1-10-2024 ACTIVITYDATE SUMMARY 6/2/2023 CTU #6 1.75" 0.156". Job Scope: Mill CIBP, Log, Perf MIRU. Weekly BOP test. MU YJ 1.69" milling assembly w/ 2.28" venturi/burnshoe. RIH. Tag CIBP at 11764' CTM. Mill and push down to lower CIBP at 12399' CTM. POH. ***Job In Progress*** 6/3/2023 CTU #6 1.75" 0.156". Job Scope: Mill CIBP, Log, Perf POH. LD 1.69" milling assembly w/ 2.28" Venturi burn shoe. Recovered CIBP parts in Venturi. MU GR/CCL logging toolstring (2.20" carrier) w/ 2.25" DJN. RIH. Btm Stop E: 12,390' M: 12,397' Hes Box: 12,390.04'. Flag Red w/ White stars E: 12,340' M: 12,347' HES Box: 12,340.14'. Top Stop E: 8899.4' M: 8898' HES Box: 8899.46'. POOH. BD HES Mem Tools. Data NOT GOOD - tool shut off at 7 am this morning. MU HES Mem Tools w/ 2.25" DJN. RIH. Make same logging stops as above. POOH. Good Data (+12' correction; confirmed with OE). Begin MU Perf Gun #1. ***Job In Progress*** 6/4/2023 CTU #6 1.75" 0.156". Job Scope: Mill CIBP, Log, Perf MU Perf Gun #1: 13' of HES 2" MaxForce perf guns. RIH. Correct depth at flag. RIH to shot depth. Perforate 12365' - 12378'. POH. Shots Fired. BD Spent guns & firing head (1/2" ball recovered). PT MHA. MU Perf Gun #2: 18' HES 2" MaxForce perf guns. RIH to flag and correct depth to top shot 12,349.4' md. PUH to top shot 12,338'. Load and launch 1/2" ball. Ball on seat @ 30.5 bbls and fired @ 3000 psi. Perforate 12338' - 12356. POOH. BD Spent perf guns & MHA. RDMO CTU 6. ***Job Complete*** Daily Report of Well Operations PBU 06-24B gy MU GR/CCL logging toolstring (2.20" carrier) w/ 2.25" DJN. RIH. Btm Stopgg g g ( ) E: 12,390' M: 12,397' Hes Box: 12,390.04'. Flag Red w/ White stars E: 12,340'g M: 12,347' HES Box: 12,340.14'. Top Stop E: 8899.4' M: 8898' HES Box: 8899.46'. POOH. BD HES Mem Tools. Data NOT GOOD - tool shut off at 7 am this morning. MU HES Mem Tools w/ 2.25" DJN. RIH. Make same logging stops asg above. POOH. g MU Perf Gun #1: 13' of HES 2" MaxForce perf guns. RIH. Correct depth at flag. RIH to shot depth. Perforate 12365' - 12378'. POH. g MU YJ 1.69" milling assembly w/ 2.28" venturi/burnshoe.ygy RIH. Tag CIBP at 11764' CTM. Mill and push down to lower CIBP at 12399' CTM. The milled CIBP fish and the adperfs are correctly shown on the new WBS, below. -WCB g MU Perf Gun #2: 18' HES 2" MaxForce perf() guns. RIH to flag and correct depth to top shot 12,349.4' md. PUH to top shotgg 12,338'. Load and launch 1/2" ball. Ball on seat @ 30.5 bbls and fired @ 3000 psi. Perforate 12338' - 12356. a, STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed °+ r y to , Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Changed p ed Gem ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 212-190 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20822-02-00 7 Property Designation (Lease Number): ADL 028311 8. Weil Name and Number: PBU 06-24B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 12578 feet Plugs measured 12416 feet true vertical 8923 feet Junk measured 12500 feet Effective Depth: measured 12416 feet Packer measured 8850, 8964 feet true vertical 8996 feet Packer true vertical 8279, 8374 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 79 20" 33-112 33-112 1490 470 Surface 2461 13-3/8" 33-2494 33-2493 5380 2670 Intermediate 8106 9-5/B" 31 -8137 31 -7678 6870 4760 Liner 1207 7' 7965-9172 7515-8549 8160 7020 Liner 461 4-1/2" 9017-9478 8418-8797 8430 7500 Liner 3189 3-112" x 3-1/4" x 2-7/8" 9384-12573 8723-8925 10160 / 10570 10530/11160 Perforation Depth: Measured depth: 11454 - 12462 feet True vertical depth: 9036-8977 feet Tubing (size, grade, measured and true vertical depth) 4-1/7' 12.6#, 13Cr80 / L-80 29-9019 29-8420 4-1/2" Baker S-3 Packer 8850 8279 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Packer 8964 8374 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 192 15887 99 0 917 Subsequent to operation: 926 20100 133 0 1159 14.Attachments: (requlred per20 MC 25.070.25071,&25.293) 15. Well Class afterwork: Daily Report of Well Operations RI Exploratory ❑ Development p Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and corect to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Thompson, Ryan Contact Name: Thompson, Ryan Authorized Title: Petroleum Engineer Contact Email: RYAN.THOMPSON@bp.com Authorized Signature: // Date: I O I ZO Zo Contact Phone: +1 907 564 4535 Form 10-004 Revised 04/2017 g10%7',V 1lgDMS�'"'JAN 1 31020 Submit Original Only Daily Report of Well Operations PBU 06-24B ACTT V ITV nATF c1 mnnn n ov ****WELL FLOWING UPON ARRIVAL**** (Perforating) DRIFTED W/ 22.42'x 2" DUMMY GUNS TO DEVIATION @ 9,725' SLM 12/7/2019 ***WELL LEFT SHUT IN, DSO NOTIFIED*** CTU #8 - 1.75" coil, 0.156" wt Job Objective: Add perfs MIRU. Load well with 1% slick KCI w/ safelube. RIH w/ HES memory GR/CCL logging BHA. Drift to CIBP at 12416' CTMD. Log up from compression to 10400', painting a red tie-in flag at 12350'. POOH. 12/13/2019 ...continued on WSR 12-14-19... CTU #8 - 1.75" Coil, 0.156" wt ***Continued from WSR 12-13-19*** Job Objective: Add Perfs Freeze Protect Flowline. Make up Perf Gun BHA #1 with 31'x 2.0" Powerjet Omega Perf guns, 6 spf. RIH. Perforate 11,609'- 11,640'. POOH. Shots fired and ball recovered. MU & RIH w/ gun #2. Perforate 11,578' - 11,609' Shots fired. Trim coil, change pack offs. Make up Perf Gun BHA #3 With 31' x 2.0" Powerjet Omega Pert guns , 6 spf. RIH. 12/14/2019 ...Continued on WSR 12-15-19... CTU #8 - 1.75" Coil, 0.156" wt. ***Continued from WSR 12-14-19*** Job Objective: Add Perfs Tag CIBP and Tie-in. Perforate 11547-11578. POOH. Make up Perf Gun BHA #4 with 31'x 2.0" Powerjet Omega Perf guns , 6 spf. RIH. Tag CIBP and correct to bottom shot. Perforate 11,516'- 11,547'. POOH. Shots fired and ball recovered. Make up Perf Gun BHA #5 with 31'x 2.0" Powerjet Omega Perf guns , 6 spf. RIH. Tag CIBP and correct to bottom shot. Perforate 11,485' - 11,516'. POOH. Shots fired and ball recovered. Make up Perf Gun BHA #6 with 31'x 2.0" Powerjet Omega Perf guns , 6 spf. RIH. Tag CIBP and correct to bottom shot. Perforate 11454 - 11485. POOH. 12/15/2019 ...Continued on WSR 12-16-19.... CTU #8 -1.75" Coil, 0.156" wt ***Continued from WSR 12-15-19*** Job Objective: Add Perfs POOH and FP well. All shots fired. Blow down coil with N2. RDMO CTU. 12/16/2019 ***Job Complete*** DATE REV BY COMMENTS DATE REV BY COMMENTS 11105/82 OWAN 3 1NInAL COMPLETION 05/13/15 MSS/JMD SET CBP (05/06105) 07/18/00 WES SIDETRACK (06-24A) 12118/19 BG/JMD ADPERFS(12/15/19) 03/16/06 IORDIC2 RWO 0110920 DD/JMD MISC. CORRECTIONS O3MBM3 IORDIC2 CTD SIDETRACK(0624B) 1029/14 DJS/JMD GLV C/O (10/23/14) 03/13/15 SG/ PJC SFIY NOTE/ MN D, ETC UPDATES PRUDHOE BAY UNIT WELL: 06-248 PERMIT No:'2121900 API No: 50-029-20822-02 SEC 2, T10N, R14E, 819' FSL & 1035' BP Exploretion (Alaska) STATE OF ALASKA _SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon ❑ Plug Perforations Q Fracture Stimulate ❑ Pull TubmL Operations shutdown ❑ Performed Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casm[ 1 j Change Approved Program ❑ Plug for Rednll ❑'erforate New Pool ❑ Repair Well n Re-enter Susp Well n Other /3f r 2 Operator 4.Well Class Before Work 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Development ❑✓ Exploratory ❑ 212-190-0 3 Address P 0 Box 196612 Stratigraphic ❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-20822-02-00 7 Property Designation(Lease Number). 8 Well Name and Number ADL0028311 PBU 06-24B 9 Logs(List logs and submit electronic and pnnted data per 20AAC25 071) 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 12578 feet Plugs measured 12416 feet RECEIVED true vertical 8922 9 feet Junk measured 12500 feet JUN © e 2 015 Effective Depth measured 12416 feet Packer measured See Attachment feet true vertical 8996 45 feet true vertical See Attachment feet AOG CC Casing Length Size MD TVD Burst Collapse V Structural None None None None None None Conductor 79 20"91 5#H-40 30-109 30-109 1490 470 Surface 2468 13-3/8"72#L-80 29-2497 29-2496 92 4930 2670 Intermediate None None None None None None Production 8110 9-5/8"47#L-80 27-8137 27-7677 63 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11840-11930 feet 12010-12160 feet 12450-12462 feet True Vertical depth 9035 24-9035 33 feet 9034 94-9036 55 feet 8982 26-8976.92 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary f i Intervals treated(measured) r f�,1 C i �G I- Treatment descriptions including volumes used and final pressure S�"�N�EQ 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation. 692 36657 86 0 1011 Subsequent to operation 862 14519 13 0 819 14 Attachments(required per 20 AAC 25 070 25 071,&25 263) '15.Well Class after work: Daily Report of Well Operations ❑ Exploratory❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16 Well Status after work Oil [J Gas ❑ WDSPL Li Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Nita Summerhays Email Nita.Summerha s• b• corn Pnnted Name Nita Summerhays Title Data Manager Signat - '/� Phone 564-4035 Date 6/3/2015 ✓rL &7i j//5 —� RBDM JUN — 5 1015 Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0028311 ACTIVITYDATE SUMMARY CTU#8 w/ 1.5" Coil. Job objective: Drift/Set CIBP MIRU. FP flowline with 75 bbls of 50/50 methanol per request from DSO. RIH with 2.20" PDS Logging Carrier w/GR/CCL &2.25" DJN. Perform memory GR/CCL log from 12528' - 11400' CTM @ 40 fpm. Stop @ 12400' CTM and paint white flag. Download data (+)4' correction. MU & RIH with WFT 2-7/8" CIBP (OD= 2.20"). 5/5/2015 ***Continue on WSR 05/06/15*** CTU#8 w/ 1.5" Coil. Job objective: Drift/Set CIBP Set WFT 2-7/8" CIBP at 12,416' ctm. Set 2k down to confirm plug set. POOH. Cut 100' of pipe (CR management) RDMOL and head to SLB yard for Planned Maintenance. 5/6/2015 ***Job complete*** FLUIDS PUMPED BBLS 125 METH 42 50/50 METH 146 1% KCL W/SAFELUBE 313 TOTAL m NQ O o o O C o 0 0 o 0 O cD CON (O CO co N O O U y 0 0 0 0 0 0 0 0 0 0 0 i 0 CO CO O N ~ N- M CO CO 7 V ( o COD 6) N- V V CO co CO CO V CO CO N CO N- N d' CO N CO .- O CO .- CD N CO O) O) CO C) O) N N co CI) N CD N- Ch 0) 0) N- N N N-- 1.0 1.0 N- N- O O) CO 'Cr CO ":1- CO CO CO O) CO N- N 00 CO H CO CO N- N- N C7 O 0 ; cor ON N C V V C!) V O Ch co N- CO CO CO O) r CO a) N CO N r� O O V V O t N O) A CA O CO) CO N CO O) CI QV"" LC) O (N ~ O M0 CO r (A N- O LO r— CO CO CO (7) C 'Cr 0 N N N N 0) N = .Q o O co 0 0 0 0 0 0 Cb 000 Q O J oo ao CO CO Cb O () , J J J J , _ N CO CO CO Lo . Lc) h. Nigt * N_ •(n • c O CO CO _ CD O N N V CO O N U N � � ; Cn "' � NN N '' M M N O r ' +-' � O CO CO N- O C N O V O O V N O) co N N CO N CO J E C)0 0 a H H W 0 U U OO CCr_tLt Q . Z Z Z Z W W W W W 0 rym m m p z z z z z j D D D U J J J J J O U) H H Packers and SSV's Attachment ADL0028311 SW Name Type MD TVD Depscription 06-24B PACKER 7965 7514.38 7" Baker ZXP Top Packer 06-24B PACKER 8857 8285.38 4-1/2" Baker S-3 Packer 06-24B PACKER 8964 8373.9 4-1/2" Baker S-3 Packer 06-24B PACKER 9017 8418.13 4-1/2" Baker ZXP Packer TiS: 5-1/8'FMC120 WELLHEAD FMC 06-24 B _NOTES: DOGLB:33.1'@Y1000 0ANG4 1/ 27 MAX CHROME TBG' ACTUATOR BAKER C OKB.aEV= 74' J �1= BF.ELEV / 26' -5-1l2'X 4-1/2"XO,D=3.958" IMP' 2997' 20'CONDUCTOR, - 9 ' ' 2184' -4-12'FES X NP,D=3.813' Max Angle= 118'@ 12503' # Datum M _ D= 9582' ' Datum TVD= 8800'SS D GAS LFT MANDRELS ST M) TVD1 DEV TYPE VLV LATCH PORT LATE 13-38'CSG,72#,L-80,D=12.347' H 2496' 4 3447 3425 22 MAG DOBE RK 16 10/23/14 y 3 6104 5821 27 WAS SO RK 20 10/23/14 9-5/8'X 7'BKR ZXP LNR TOP PKR, - 7965' 2 7766 7328 21 MAG DMY RK 0 03/14/06 w/FLEX LOCK HMC HGRD=6.313' 1 8762 8279 14 KGB-2 DAY BK 0 03/14/06 9-5/8"CSG,47#,L-80 BT&C,D=8.681' - -8137 MLLOUT WNDOW (06-24A) 8137'-8155' Minimum ID = 2.37" @ 9384' I 1----1 8829' H4-12"FES x rte,D=3.813" 4-112" KB LNR TOP PKR S X 8850' -7'X 4-1/2"BKR S3 PKR D=3.870' ' 8872' - 4-12"HES X NP,D=3.813" 4-1/2"TBG,12.6#,13CR80 VAM TOP, - 8931' 1 -- 1 .0152 bpf,D=3.958' 8940' -r X 4-1/2"UNIQUE OVERSHOT 4-1/2"TBG STUB(03/03/06) H 8932' 8964' -T X 4-112'BKR S-3 PKR D=3.875" ' , 8997' -412'FES XN NP,MLLE)TO 3.80'(01/20/13) TOP OF 4-1/2"LNR - 901r 901 T -T X 5'BKR ZXP LNR PKR 0=5.250' 412'TBG, 12.64,L-80 NSCT.0152 bpf,D=3.958" - 9019' 9019' - 4-12"WLEG,D=3.958' \ 9020' -RAD Ti'LOGGED ON 09/14/00 9031' -TX5"HNC LNR HGR,ID=4.375' T LNR 264,L-80 BTC-M,.0371 bpf,D=6.184' - 9172' 9038' -5'X41/2'XO,D=3.937" 9384' -4-1/2'KB LIP,D=2.37'(03/21/13) 9398' -3.70'DEPLOY SLV,D=3.00" 9420' -13-12'HES X NP,D=2.813' 3-12'LNR,9.3#,L-80 STL,.0087 bpf,D=2.992' - 9452' 4-12'LNR,12.64,L-80,.0152 bpf,D=3.953' - -9478 9452' H3-12'X3-1/16'XO,D=2.786' 412"BKR VVFPSTOCK(0120/13) - 9478' MLLOUT WNDOW (06-248) 9478'-9487' PERFORATION SUMMARY REF LOG:MWD(GR/RES/ROP)ON 03/06/13 ANGLE AT TOP PERF: 8T @ 11840' Note:Refer to Production DB for historical perf data /. -1 1049T -3.1/16'X 2-7/8'XO,D=2.377' SIZE SPF NTBRVAL Opn/Sgz SHOT SQZ 2' 6 11840- 11930 0 03/06/13 2" 6 12010-12160 0 03/06/13 I 2' 6 12450-12462 C 03/06/13 12416'CTIAD -2-7/8'VVFT CEP(05/06!15) / ? -I RSH-3/8"STEEL BALL(MAR 2013 RIG) 3-3/4"LNR;6.64,L-80 TC11,.0079 bpf,D=2.850 -I1049T ' 12531' H PBTD 2-7/8'LNR,6.54,L-80 STL, .0058 bpf,D=2.441' - 12573' '�'� NR DATE REV BY COM ENTS CATE REV BY COM ENTS FRUCHOE BAY UNIT 11/05/82 i)WAN 3 INTIAL COMPLETION 05/13/15 MSS/JMCI SET CBP(05/06/15) WCL: 06-24B 07/18100 WES SIDETRACK(06-24A) PBRF4TNo: 2121900 03/16106 NORDIC2 RWO AR No: 50-029-20822-02 03/08113 NORDIC2 CTD SIDETRACK(06-248) SEC 2,T1ON,R14E,818'FSL 8 1034'FEL 1029/14 CJS/JM)GLV CIO(10/23/14) 03/13/15 SG/PJC SF-TY NOTE/MN I),ETC UPDATES _ BP Exploration(Alaska) co I' LL J J J JI JI N N 9 II9I I O W_ W_ W_ c N �I LT_LLI LIII LLI Z Z N 0 O W CO Z c J J a I- z z z �I LLI e° N Z Z Z o) U 2 m 0 LL L_ LL CO o) d 9 �>I c c y 0I 0I 0I j �j If) 2 2 OO �o 0 7 007 I I I I I C >. — y co M co co M O Z O Z LE-jp 0 0 O O O Z = y vi a)i c w m m N m m co CO E LL Q w m m 0 - I w w w ww C N C - C + LL J o) O) O) O) O N O ,- r _-z ,— r J u p m m a LL a .� d Z m N1 co NI > 01 0 NI m N1 E d EZ 8 Ez — mLLrnn 0a) o , 00 Oo 00 00 O C Isl a- d p t = O t - f0 103 �' C' N W Q' E ce E U p o c ":' 'o OZ` a U 0- a) I a) I w I a) I Oi 10 QZ o E d a) os U oZ o �3°0 �(7 E �C� E �C�w ce DC7= cLLiC�= .N=. I w E,o o E + E 3 .E TIMI .c�I m .E ,I O .c�I a •E.-ml 5.-1ml N ,I O) OIL -0 O0 J O0 J Om '- Om - Om- Om - Omd 2m0 < cn o U c c �U 2 20 Z -aN Qam -am Dam m, -aJ J ..c" j', m •m 0W 0 0� 0 dam 2a 1 dm I IR .a. I �aW a)mW Q E i2 2() 2() WNW W N O W ND W ND W NLL W NLL d p O0 = _M co co co M _M M M_ _) co_ co_ _M CL U Y j 0 O O O O O O O O O O O COLU g •0'N N N N N N N N N N N N O f 0 y N N N N CeJ N re M M LO In U) LO CO CO -6 (O (O CO a X c c c c c c CD U W J S = o_ 0. a CL p 0 0 0 0 0 0 0 0 Zao COM CO v o 0. v Co Q f0 = �JLo r r r r r r J a mI 0 CL o h. M 0 c z� i/ 't o o a) a C 0 O i'' J co co CO c p m ,� (U 1. to 0o co o) O N o 0 r UCO 0 1 N C o J CO CC z° a) et Qc0 1 N T 0. I- O 016 Z 0 0 0 O O M _ J 0 0 /N (I) 0 COCr ILI 073 Ca M W J fn N N °? I Cl) r0 0 v� O D vi < re ct 0 Q EII / ZI -i 0 CI E U /� m m Z Cl)= co g CO (0 m m CO w 0 c c N N CO Co 15 N N !C N N °) è E o 0 0 0 0 0 0 0 0 0 0 0 / co Z u Z ZZ Z m m m m m CD N N a0) a0) 5)) a0) O) O) 'Orn O) 0) 0) 0) 0 O u) v) co v) 0 0 O 0 0 0 o 0 Z 0 .. 0 _ _ O 0 J 0 M M )n LO LO LO )n )n c7i 1— N c Zcc g 0 r W 0 Z N N CV N N N N N N N N O RI O € aE ` 03 LLZ •` w ce2 y U OrLL O W LL 0 ce Z W J 0 0 U U 0 0 0 0 0 U E 5 a 8 d I'I ct H 3 JisH%W cJ_ -_W J W W W 0 "' W W I ¢ a9 N N JI CO ml ml ml W W W csl O W 0 0 0 - LL LL ,6- CV Ncsl N O Z U' CO W W W JI j j C7 ., LI CO N 0 N Z (I O co WI WI WI WI Z Z Z O 7 01 0 CO H N 5 0 N (n Z_ Z_ Z_ �I �I �I N T 4 cD d WI til LI Cl) O (!) p c Z (0N 6 OU 2I 2I 2I �I �I �I j m >_ E 0 W Q 1 col M M M M _M } a y J O O O O O O Q Q rn CO LL W m m m m m m CO W -LL W W W W W W W J 0 w I1 C) ()JI 0p, us us us 0p, co 02 � ce— 0 c Q N N N N N N 0 0 0 Lt If; w �_Ea) �_ O) 0) �_ W _� 0) E �_ 0) 0 w w02 a (n IN aa' Ww m U- aa' E WCC E U- a(n c co 0 !cocaw o 0- (0 I 0 IE .2 I 0 11:7) v I rn 2 I v cc N E � I O W E 1 cc ace clr Ext.) cixo ccco- p W E Cl) 10 12230 090 o-Jcp —0 E 20 E 20— °0= ,2C7= °C7= 090 E LL I I Cr) I Cr) I13 I I I J N 112�W W 12��I y� c? ym �? �m� 0- A2,r 12mml ymml �w 0 Ce Q N IWNLL NI WNO WN I WN I W NI WNO W NO WNO NI O ` �',M M M M M M M M p, x 0. P 0 0 0 0 0 0 0 o E (n E W N N N N N N N N co 7 N. N. N. N. r n O Z .- '' r r r r r r Ce0 (-8 (O (O (O c0 (O (O (O a w W J d U m o Z o co cc QyO N 0 ° 7 J . 2 _ 0 • u) ` C M p N-p I V) C O .� o rn O N p. • N E pp o J m N o Q N d a 0 0 L_ Z _M I'I _ Cl) to O Q N .2.., C CO m h. Mi w m CO I • Ta .� M o Q CC a) Q o d CI 13 0 HN E `o `m 0 m z 0) 0) m m CO m m CO CO m 'm M 0 0 0 0 0 0 CO 0 E rn o I co co co co co co m I o .. .. .. • m m m m a m m m o) (3) C) 0 0 ° o 0 0 0 0 0 0 _1 E O Lo 14) UD OD co co co co co N N N N N N N N N N N w N N N N N N N N N N N co W a y ce E E z •: co in Z O D h o y Q U Y �U U U 0 U U U 0 C10 U • 0 'O o 0 0 0 0 0 0 0 o y Z a 1w _J W w w w w w w —I 1 I rn co 0 G O N N /V ZA N N O c Z } } } m N O' 0 y N 9 Cl) Cl). d ON c . C N co O Qcn _ Z a O O II -1 t L E. O a `� �% P.Q N 2 `o 0 & U O J _ z o 11+1 Q Q Y j Z / Z T2' 3} } } r / aci f 0 i 0 ce Q N 0 a' t i O Zo u m III OU rn 115 O I W go o J d it E LU X a' N ul CI ,, _N I cm _J 7 Oa V O. O c EJ Z N ?: co O N NQ I: O O J a c I m v E I ,O in 2 U 0 IOm '. co) c II 1I I O ag o I �, ON a , N U /G c w co a' o J CO } }i E rn NQ o/o E oU a F"' co °o m 1 C o m Z I G Q aNi Co 11 E11 CCI m M o E 1 1 �Ns w w Ni0 c o, CO «' o m d ca g e 0 11 Ul lhq Q c a ° O 1 ` Z o N N .- 0 E U o 2 a z H h a' CO N ¢ N N N Z IIlli . CO _ p co -c-o- N if } NO O `-}Q' Q. 9N o 0 3 N c CO d a Cl) _n 2 :i y . W isct ` H m U O a' c I m 0 u, c Z Cl)c0 « I.) o 0 o Q o O «� c 1 c U wa E a E 0. o Ea' o o oa' O 2 a' 0 a' 0 0 a 0 . 0 0 C 0 H U 4 �., d a j/ ys Ma BAKER PRINT DISTRIBUTION LISTN 10 2u13 HUGHES AOGCC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) 2` 2- `9 0 WELL NAME tP Cp -24 a? _1 RUN NUMBER 2-229 (mandatory) FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 6/5/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FINAL (digital ' I/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #OI-THIN 15 #OF COPIES #OF COPIES 1 BP Exploration(Alaska)Inc. I 3 I 1 I I I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I I 1 I 1 I Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska I 1 1 1 I I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 -- — — 4 State of Alaska-AOGCC I 1 I 1 1 I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I I 1 I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 J TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 ROS tic" r' 8 ,easD rim �- �. BAKER PRINT DISTRIBUTION LISTm 10 Zch3 HUGHES AC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME D �O—2 ��1 RUN NUMBER l 2 '9 0 (mandatory) 2,2_7e4 5 FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 6/5/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FIELD FINAL (digitalCD / ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #Ur NI-tIN I S #OF COPIES #OF COPIES " U 1 BP Exploration(Alaska)Inc. 1 3 1 I I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I I 1 I I Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska I 1 1 1 I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I 1 I 1 I I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I I 1 I I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 Z\2-\ 3 R:. 2-2G4 vim'' c-' '�' .moi O U 2 r . _ o O O t �" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO 0 0 0 0 0 0 , �py U U U U U U U U U U U U U U U U U U U U U U 'A li 0 tr1 r P r . . . . . r' r . . . . . . . . . . . . b O O �a o ti `. n a- 6 (d 1t c;. z O 4J • Q �" a .1 o. N z) O.-� W M U) v2 (.`z z `.. OD ( c PI C3 v cc 2 \ `n l7 rn J CO Ln YQ '-+ 0 N in 4••• ,- N N O O M M M M M 7 N 05 RS• O M �� O W d 0 0 0 0 0 0 0 0 0 N N N Q (C eC Q Q N a O i./ ((1 (d L`' ..,-; (-81g202 Z Z Z Z Z Z Z z LL rL LL LL Q 2L g 1 Q - U1 C'-: N O M M CO 6 CO 6 tt0 00 oD 6 N r x D. 5 Q cn J O ---.-- T?'-"Ill - \ co V m N Z -J M M LL ZO co 0 Z O Z Z i- fx J ~ a Q < J 0 a a Q 0 a ` J Q N Q N co U V) co V) ?r F- 0 co U H U) Q H U U J J J O Q' E' 22 W U Z N (n U' J i- I' m H 2 Z F- Z Z Z 2 O N O > Z O Q O Z g CCJ U) O u) O O CO O O O W U M co J 2 (A L W 2 LL S 2 0 co 0 N co 0 L 2 2 2 H- -: M O .i D rc 2 o X X X M N • Z Q X X X X X X X X • Q O H h- ') X X X X X X X X X X X 0 un i !: iB 4 j. c, ,_ N O O O O O O O O 0 N N. 0 0 CNI 01 et 0 00 M h n M O y - w C O O C o O O O O o O O O O O O O `1"0 c O O O T CS 0 O O o O O O o O O o O O o O o O O O O Q Cipo o o 4k o c' o 0 0 0 0 0 0 0 0 0 0 0 0 o 00 N w Z CC CO (n (D CO Co CO Co (D (n -) (A (n W X 0 X --) - N M N U X X X X X X X X >- > N m m N (A Q U U N W p . o ^ ,' U U U m m m m m m m m m [n co U OO OO U U fa OO U c 0 O Ca V) ch N m Q1 Ol (4 • MI N o CD c c Y a 6 d = Q Q1 , Lu U o 0 0 o a o 0 0 0 0 ("> 00 c0 OG co o Q G1 cu cu ':;2 N c N M M M M M M M M M M 41 M M a. N N M M N J N a) .n, c = Lu Z il° in (0 c0 w _ Q CV '7 eg g ci g tt g g st g N O O t0 co Ln Ln u f0 4- '-- Z O > N > 0 0 0 0 0 0 0 0 0 0 O o r- - N 0 m O Q 0 v � N u p� M CO O U H D U § N Q 17� ___. x a CO al < McMains, Stephen E (DOA) From: Lastufka, Joseph N [Joseph.Lastufka@bp.com] Sent: Wednesday, April 24, 2013 8:36 AM To: Hunt, Jennifer L (DOT) Cc: McMains, Stephen E (DOA) Subject: PBU 06-24B/ PTD#212-190 app Hi Jennifer, 1, Hi Please reference the following well: Well Name: PBU 06-24B Permit#: 212-190 API #: 50-029-20822-02-00 Date of Test: 4/21/13 Type of Test: IPT (Initial Production Test) Choke Size: 70 Choke Unit: Production Method: Gas Lifted Duration (Hours Tested): 12 Top Reference (Top Perf MD): 11840' Bottom Reference (Bottom Perf MD). 12462' Tubing Flowing (Pressure): 806 Casing Pressure: 1220 Total Test (Rate f/O, W, G): 1050/0/9547 24-Hour Rate (0, W, G): 2100/0/ 19093 Gravity (Oil, API): Not Available GOR (Gas-Oil Ratio): 9093 This well began Production on RBDMS APR 2 4 2013 Aefric- Method of Operations on this date: 4/17/2013 1 RECFRIFD STATE OF ALASKA Ar:',', . 2;;;y ALASKA OIL AND GAS CONSERVATION COMMISSION p WELL COMPLETION OR RECOMPLETION REPORT AND LOG°OCCC la Well Status: 0 Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1 b. Well Class 20AAC 25105 20AAC 25110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Development ❑Service 2. Operator Name: 5. Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 3/7/2013 212-190 3. Address. 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 2/13/2013 50-029-20822-02-00 4a. Location of Well(Governmental Section). 7.Date T.D.Reached: 14. Well Name and Number: Surface. 2/27/2013 PBU 06-24B 819' FSL, 1035' FEL, Sec.02,T1ON, R14E, UM 8. KB(ft above MSL): 71 15.Field/Pool(s) Top of Productive Horizon: 2953' FSL, 3114' FEL, Sec.02,T1ON, R14E, UM GL(ft above MSL)' 37.12' Prudhoe Bay/Prudhoe Bay Total Depth' 9.Plug Back Depth(MD+TVD) 2006' FSL, 1110' FEL, Sec.02,T1ON, R14E, UM 12531' 8945' 4b. Location of Well(State Base Plane Coordinates,NAD; 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 685942 y- 5941416 Zone- ASP4 12578' 8923' ADL 028311 TPI: x- 683808 y- 5943499 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit. Total Depth:x- 685835 y- 5942601 Zone- ASP4 None 18. Directional Survey: ®Yes 0 No 19 Water depth,if offshore: 20. Thickness of Permafrost(TVD). (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21 Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/Induction RES/DEN/NEU, GR/CCL/MCNL 9478' 8797' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE ToP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 79' Surface 79' 30" 1930#Poleset 13-3/8" 72# L-80 Surface 2496' Surface 2496' 17-1/2" 2200 sx Fondu,400 sx Permafrost'C' 9-5/8" 47# L-80 Surface 8137' Surface 7678' 12-1/4" 500 sx Class'G', 300 sx PF'C' 7" 26# L-80 7965' 9172' 7514' 8549' 8-1/2" 237 sx Class'G' 4-1/2" 12.6# L-80 9017' 9478' 8418' 8797' 6-1/8" 135 sx Class'G' 3-1/2"x3-1/4"x2-7/8" 9 3#/6 6#/6 5N L-80 9384' 12573' 8723' 8925' 3-3/4" 155 sx Class'G' 24. Open to production or injection? IS Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ (MD+TVD of Top&Bottom;Perforation Size and Number)' TVD) 2"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr80/L-80 9019' 8850'/8280' 8964'/8374' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11840'-11930' 9035'-9035' ;L; !'i 4, 1 WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes 0 No 12010'-12160' 9035'-9037' 12450' 12462' 8982'-9877' iiii DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED �; ; '412500' Freeze Protect w/38 Bbls of Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc I Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE' GAS-OIL RATIO: Test Period •4 Flow Tubing Casing Press. Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes is No Sidewall Core(s)Acquired? 0 Yes 0 No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBDMS APR 0 2 2013dif' wl Form 10-407 Revised 10/2012 17br 5/`1 h_3 CONTINUED IFEF9E Submit Original Only 29. GEOLOGIC MARKERS(List all formations and. ers encounter 30. FORMATION TESTS NAME MD TVD Well Tested' 0 Yes IS No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. CGL/Zone 3 9524' 8832' None Base of CGL/Zone 2C 9642' 8901' 23SB/Zone 2B 9907' 8968' 22TS 10273' 9017' 22TS/23SB Zone 2B(Invert) 10955' 9032' 23SB Zone 2B/Base of CGL Zone 12439' 8987' 2C(Invert) Formation at Total Depth: Base of CGL/Zone 2C(From Base) 12439' 8987' 31.List of Attachment: Summary of Daily Drilling Reports,Summary of Post-Rig Work,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Email. Bradley.Gorham@bp.com Contact: Br-. Gorham,564649 Title: Drilling Technologist Printed Name: .- -tufka' Signature: Jt\ Phone 564-4091 Date: II/1 /13 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25 071. Form 10-407 Revised 10/2012 Submit Original Only TREE= 5-1/8"FMC120 WELLHEAD= FMC 06-24 B SAF, TOTES:***4-1/2"CHROME TBG*** ACTUATOR= BAKER C INEIIAL KB.ELE 71' I " I 26` —15-1/2"X 4-1/2"XO,ID=3.958" BF.ELEV KOP= 2997' ' 2184' —I4-112"HES X NIP,0=3.813" Max Angle= 410©9777' Datum I1J= 9375' GAS LFT MANDRELS Datum TV D= 8800'SS i k ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3447 3425 22 MMG DOME RK 16 03/21/13 13-318"CSG,72#,L-80,ID=12.347" H 2496' 3 6104 5821 27 PvtA) SO RK 20 03/21/13 11 2 7766 7328 21 MD DMY RK 0 03/14/06 9-5/8^X 7^BKR ZXP LNR TOP PKR, H 7965' 1 8762 8279 14 KGB-2 DMY BK 0 03/14/06 w/FLEX LOCK HMC HGR,D=6.313" 9-5/8"CSG,47#,L-80 BT&C,ID=8.681" —I -8137 MILLOUT WINDOW (06-24A) 8137'-8155' ' 8829' —4-1/2"HES XNP,D=3.813' .1 X 8850' —17"X 4-1/2"BKR S3 FKR,ID=3.870" ' 8872' —14-1/2"HES X NP,D=3.813" 4-1/2"TBG,12.6#,13CR80 VAM TOP, H 8931' .0152 bpf,13=3.958" 1— 8940' -17"X 4-1/2"UNIQUE OVERSHOT 4-1/2"TBG STUB(03/03/06) H 8932' 2 8964' —I7"X 4-1/2"BKR S-3 FKR,D=3.875" iii TOP OF 4-1/2"LNR —I 9017' 8997' —14-1/2"HES XN NIP,MLLED TO 3.80"(01/20/13) , 9017' 7"X 5"BKR ZXP LNR PKR ID=5.250" 4-1/2"TBG, 12.6#, L-80 NSCT.0152 bpf,ID=3.958" — 9019' 'I \ 90199020'' J—I-{4l3-iMDll^TT WLEGLOG,GED=39NON 09/14/00 9031' --17"X5"HMC LNR HGR,ID=4.375" 1 7"LNR,26#,L-80 BTC-M,.0371 bpf,ID=6.184" l 9172' , 9038' H 5"X4-1/2"XO,D=3.937" 9384' —I4-1/2"KB LW,ID=2.37'(03/21/13) 9398' —13.70"DEFLOY SLV,D=3.00" 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf, ID=2.992' —I 9452' 9420' --I3-1/2"HES X NP,D=2.813" 4-1/2"LNR, 12.6#,L-80,.0152 bpf,ID=3.953" —I "°9478 9452' —I3-1/2"X 3-1/16"XO,D=2.786" 4-1/2"BKR WI( TOCK(01/20/13) —I 9478' FERFORA TON SUMMARY MILLOUT WINDOW (06-24B) 9478'-9487' REF LOG_MWD(GR/RES/ROP)ON 03/06/13 ANGLEATTOP FERE: 88°@ 11840' Note:Refer to Production DB for historical perf data l SIZE SPF 1 INTERVAL Opn/Sqz SI-OT SQZ 2" 6 11840-11930 0 03/06/13 10497' H3-1/16'x2-7/8'XO,ID=2.377" 2" 6 12010-12160 0 03/06/13 / lik 2" 6 12450-12462 0 03/06/13 ? —I FISH 3/8"STEEL BALL(MAR 2013 RIG) 313/4"LNR,6.6#,L-80 TC11,.0079 bpf,ID=2.850 —I 10497' PBTD — 12531' 2-7/8"LNR 6.5#,L-80 STL, .0058 bpf,D=2.441' —I 12573" A DATE REV BY COMMENTS DATE REV BY COMETS PRUDFDE BAY UNIT 11/05/82 ROWAN 3:IMTIAL COMPLETION 03/26/13 RKT/PJC SET LTP&CIO GLVS(03/21/13) WEAL: 06-24B 07/18/00 N7ES SIDETRACK(06-24A) FERMT No:'2121900 03/16/06 NORDIC2 RWO AR No: 50-029-20822-02 03108/13 NOROIC2 CTD SIDETRACK(06-24B) SEC 2,T10N,R14F 818'FSL&1034'FEL 03/08/13 PJC DRLG DRAFT CORRECTIONS 03/20/13 BMG/PJC MAL DRLG CORRECTONS BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) ' Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) Project Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM I Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations : (hr) — (usft) I —__ — -- 2/11/2013 09:30 - 14:00 I 4.50 MOB P PRE BEGIN RON EVENT AT 0930 ON 02/11/13. RELEASE RIG FROM 06-22B AT 0930. I PJSM THEN JACK UP RIG,MOVE OFF WELL i ;06-22B. SPOT RIG DOWN THE PAD. CLEAN UP MATS AROUND 06-22,MOVE THEM 'TO 06-24 AND SPOT MATS. 14:00 - 16:00 2.00 MOB P PRE !MOVE RIG OVER WELL 06-24 AND SET I DOWN. ACCEPT RIG AT 14:00. START RIGGING UP. 16:00 - 20:00 4.00 BOPSUR P PRE LEAK TIGHT TEST ON SWAB IS GOOD,TO REMOVE TREE CAP. REMOVE TREE CAP,INSTALL BOPS. 20:00 - 21:30 1.50 BOPSUR P PRE PJSM GREASE VAVLES,FILL STACK SHELL TEST BOPE 21:30 - 00:00 I 2.50 BOPSUR P PRE I START BOPE TEST 'TEST WITNESS WAIVED BYAOGCC. 2/12/2013 00:00 - 03:00 3.00 BOPSUR P j PRE CONTINUE TESTING BOPE TO 250/3500 PSI FOR 5 CHARTED MIN TEST CHOKE VALVES,CHOKE AND KILL HCR, [INSIDE MANUAL VALVES ON CHOKE AND KILL j j !LINE,BOP RAMS AND ANNULAR PREVENTER. TEST 2 TIW VALVES FUNCTION BOPE FROM BOTH REMOTE I I PANELS TEST IS WITNESSED BY TOOLPUSHER AND ii I I !WSL. -SEE ATTACHED CHARTS AND TEST REPORT 03:00 - 03:30 0.50 I BOPSUR P PRE I RIG EVAC/H2S DRILL WITH CREW FOLLOWED --- BY AAR 03:30 - 04:30 1.00 BOPSUR P PRE I FILL PITS,FILL COIL. ___ 04:30 - 06:00 1.50 BOPSUR P • PRE I INNER REEL VALVE/PACK-OFF TEST TO { 1250/3500 FOR 5 CHARTED MIN 06:00 - 08:30 2.50 BOPSUR P PRE PREP TO PUMP SLACK BACKWARDS AND CUT CT. PUMP CABLE SLACK BACK INTO REEL AND CUT 270 FT OF CT. INSTALL CT CONNECTOR AND PULL TEST, PRESSURE TEST. INSTALL SWIZZLE STICK TO CATCH CABLE. !PUMP SLACK FORWARD UNTIL IT IS SEEN AT �END OF CT. 08:30 - 08:45 0.25 BOPSUR P PRE RIG EVAC DRILL AND AAR. 08:45 - 10:30 1.75 STWHIP P WEXIT INSTALL BHI CABLE HEAD. ---_ 10:30 - 11:00 0.50 , STWHIP i P WEXIT PRESSURE TEST NIGHT CAP THEN OPEN WELL UP TO MONITOR. MONITOR FOR 30 MIN,STATIC. _ PJSM FOR M/U BHA#1. 11:00 11:30 0.50 ; STWHIP-7 P WEXIT GET ON WELL,CLOSE SWAB. _ PUMP 1 REEL VOLUME FORWARD AT 3 BPM. 11:30 - 12:20 0.83 STWHIP —P WEXIT MU WINDOW MILLING BHA WITH 2 JOINTS OF 2-3/8"PH6. 12:20 - 14:10 1.83 1 STWHIP I P WEXIT TEST QTS TO 250/3500 PSI.GOOD. I j RIH WITH MILLING BHA Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 2 of 18 Operation Summary Report Common Well Name.06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) - i Project Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©74.00usft(above Mean Sea Level) Date From-To ( )Hrs Task Code NPT NPT Depth Phase Description of Operations hr (usft) _ 14:10 15:10 1.00 STWHIP P WEXIT I TIE-IN AT 9270'WITH(-24)'CORRECTION, FLOW CHECK,NO FLOW GET SPRS AT 9450' j PUMP 1:0.5 BPM=820 PSI,1.0 BPM=1018 PSI,2.5 BPM=1996 PSI PUMP 2:0.5 BPM=850 PSI,1.0 BPM=1033 i I PSI,2.5 BPM=2010 PSI 15:10 - 16:20 1.17 STWHIP i P ; WEXIT 'TAG WHIPSTOCK AT 9478' FS AT 2140 PSI AT 2.64 BPM. 'PVT=353 BBLS I ERRATIC RETURNS,PULL UP AND CIRC BOTTOMS UP. SMALL AMOUT OF GAS IN RETURNS,CIRC ;THROUGH THE MGS. AFTER BOTTOMS UP,FLOW CHECK,NO FLOW 16:20 00:00 7.67 STWHIP P • WEXIT ,1620 TAG WHIPSTOCK AT AND MILL WINDOW 1 FROM 9477.5'WITH 2K#DHWOB. i TIME MILL AT 1 FPH PUMPING 2.65 BPM ' i IN/OUT AT 2180-2230 PSI,1.2-1.5K#DHWOB, 9.47 ECD WITH 8.5 PPG POWER PRO PVT 355 BBLS,IA 300 PSI,OA 370 PSI KICK WHILE DRILLING DRILL W/AAR I MILL TO 9484.4'AT 1 FPH. 2/13/2013 00:00 - 02:10 I 2.17 I STWHIP P WEXIT i TIME MILL WINDOW FROM 9484.4'TO 9486.5' AT 1 FPH. - 2.64 BPM IN/OUT,2300 PSI,1.8K#DHWOB 02:10 - 02:50 0.67 STWHIP P WEXIT TIME MILL1 FT OF FORMATION TO 9487.5'. 2.64 BPM IN/OUT,2300 PSI,1.8K#DHWOB 02:50 - 06:00 3.17 STWHIP P WEXIT ;DRILL FORMATION AT 2-5 FPH i 2.62 BPM IN/OUT,2330 PSI,2K#DHWOB I CONFIRM SOME FORMATION CUTTINGS IN SAMPLE. DRILL TO 9498'FOR 10'OF RATHOLE BELOW WINDOW. 07:45 1.75 STWHIP P WEXIT 06:00 ',REAM WINDOW WITH THREE UP AND DOWN IPASSES. _ DRY DRIFT. WINDOW SMOOTH. 07:45 - 10:00 2.25 STWHIP PI WEXIT i OPEN EDC. CIRCULATE OUT OF HOLE. -H-_ __ __ HOLD PJSM NEAR SURFACE. i 10:00 - 11:30 1.50 STWHIP P WEXIT ;TAG UP. FLOW CHECK. GET OFF WELL. i UNSTAB COIL. • PULL AND LD MILLING BHA. MILL GAUGES. 3.8"GO,3.79"NO GO FOR I STRING REAMER AND WINDOW MILL. I CLEAN HIGH PRESSURE FILTERS IN REEL 'HOUSE. 11:30 - 13:00 1.50 DRILL I P I PROD1 MU BUILD DRILLING BHA. 2.0 DEGAKO WITH HYCALOG RE-BUILD SR42311M-C3 4.25"BIT j I (WITH NOSE BUTTONS). •STAB COIL. TEST TOOLS. GET ON WELL. PRESS TEST QTS. PASSED. 13:00 - 14:00 1.00 DRILL P PROD1 RUN IN HOLE. I RECORD SPRS ABOVE WINDOW. 14:00 - 14:15 0.25 DRILL P PROD1 •LOG GR TIE IN. SUBTRACT 25'. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 3 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 I End Date:2/28/2013 X3-01300:(3,525,534.00) _ I _ I Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 ; Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To 1 Hrs Task Code 1 NPT NPT Depth Phase Description of Operations I (usft) 14:15 - 17:30 i 3.25 DRILL P 1 PROD1 DRILL AHEAD FROM 9498'. I 2100 PSI FS AT 2.71 BPM IN/OUT. 100-200 PSI MTR WORK. DHWOB:1.0-1.5K# 'MW IN/OUT:8.56/8.61 PPG. BHP/ECD/TVD:4291 PSI/9.47 PPG/8740' IA/OA/PVT:387 PSI/89 PSI/364 BBLS. DRILL AHEAD TO 9580'. 17:30 - 20 00 2.50 DRILL P PROD1 DRILL FROM 9580' 2300 PSI W/200 PSI MOTOR WORK AT 1.3K# DHWOB 2.67 BPM IN/OUT OF 8.56 PPG MUD W/9.5 PPG ECD 20.00 - 21.45 1.75 DRILL P PROD1 ROP INCREASE TO 80-100 FPH FROM 9675'. 2.68 BPM IN/OUT @ 2730 PSI,630 PSI MW DRILL TO 9750'. r 21:45 00:00 2.25 DRILL P PROD1 I WIPER TRIP TO TIE-IN LOG FROM 9150',LOG WHIPSTOCK. I RA TAG AT 9487',WINDOW CONFIRMED FROM 9478'TO 9487'. 2/14/2013 100:00 - 02:00 2.00 1 DRILL `P i PROD1 1DRILL FROM 9750' 2.67 BPM IN/OUT AT 2400 PSI j I I i ROP 80 FPM,1.6K#DHWOB -_ I PVT=511 BBLS,IAP 665 PSI,OAP 400 PSI. 02:00 - 02:15 0.25 DRILL P i , PROD1 'BHA WIPER AT 9900' 02:15 - 06:00 3.75 DRILL N RREP 9,921.00 PROD1 DRILL TO 9920'.PROBLEM WITH MUD PUMP '#2.PULL UP TO ABOVE WINDOW AND CIRCULATE WITH PUMP#1. INVESTIGATION UNDERWAY.TRACTION# 4353320 06:00 - 06:30 0.50 DRILL N RREP 9,921.00 PROD1 CREW CHANGE. DISCUSS OPERATIONS AND i ( EQUIPMENT STATUS. MAKE RIG CHECKS I AND ROUNDS. I CONTINUE TO CIRCULATE IN CASING. INVESTIGATE TRACTION MOTOR PROBLEM ON PUMP#2. 06:30 - 10:00 3.50 DRILL N T RREP 9,921.00 PROD1 I DISASSEMBLE TACTION MOTOR ON PUMP#2. SOURCE REPLACEMENT PARTS FOR ' I REPAIRS. HAVE REPLACEMENT TRACTION MOTOR TRANSPORTED TO RIG WELDING SHOP. _ CONTINUE TO CIRCULATE INSIDE CASING. 10:00 - 14:00 4.00 DRILL N RREP 9,921.00 PROD1 HOLD PJSM WITH RIG TEAM. DISCUSS PROCEDURE FOR REMOVAL OF I I TRACTION MOTOR. DISCUSS ECD,SSV ISSUES. ALSO DISCUSS USE OF LOADER TO HANDLE MOTOR AND PUMP ROOM WALL I ( I I PANEL. I REMOVE WALL PANEL. LIFT TRACTION I MOTOR AND PLACE IN WELDING SHOP. JCALL FOR SLB PUMP UNIT. 14:00 - 15:15 1.25 DRILL N RREP 9,921.00 PROD1 I WAIT ON SERVICE HAND FROM ANCHORAGE. WIT ON SLB PUMP UNIT. ----------- --- - -- --- ---------------- 15:15 - 16:30 1.25 DRILL N RREP 9,921.00 PROEM SPOT AND RIG UP SLB PUMP UNIT. I ! HOLD PJSM TO DISCUSS PUMPING ICONTINGENCY. III RU SLB PUMP UNIT. SUPPLY FROM RIG PITS. HARDLINE TO RIG CEMENT LINE. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 4 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time: 10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth I Phase I Description of Operations (hr) _ (usft) 16:30 - 19:30 3.00 DRILL N SFAL 9,921.00 PROD1 RUN IN HOLE. AT 9478'SLB POWER PACK I TRACTION MOTOR PROBLEM NOTED. CALL FOR SLB MECHANICS TO TROUBLE SHOOT. 19:30 - 21:00 1.50 1 DRILL ! N SFAL ! 9,921.00 PROD1 ,DETEMINE POWERPACK ISSUES HAS TO DO I WITH THE COUPLING ON THE GEAR BOX. PREP POWERPACK FOR REPAIR.TRACTION #:4354057 ON-GOING WORK ON TRACTION MOTOR FOR MUD PUMP#2 CONTINUE CIRCULATING WITH MUD PUMP#1 21:00 3.00 DRILL AT 0.5 BPM AND 900 PSI. 00:00 N SFAL 9,921.00 PROD1 PJSM,SHUT TOP SET OF 2-3/8"PIPE/SLIP I RAMS TO HOLD PIPE. PREP POWERPACK TO REMOVE FROM RIG i !FOR REPAIR. j I I CRANE ON LOCATION AT 2200,SPOT AND I REVIEW LIFT PLAN WITH BP HSE. 'CONTINUE CIRCULATING WITH MUD PUMP#1 i i AT 0.5 BPM AND 900 PSI. AT 23:00 STOP WORK ON MUD PUMP#2 TRACTION MOTOR FOR THE NIGHT. 2/15/2013 00:00 - 02:30 2.50 ! DRILL � N SFAL I 9,920.00 PROD1 CONTINUE TO PREP POWER PACK TO l REMOVE FROM RIG,DISCONNECT HOSES AND WIRING. 02:30 - 03:00 0.50 DRILL N SFAL 9,920.00 PROD1 PJSM FOR LIFTING OPERATIONS WITH RIG CREW,SLB MECHANIC,CH2MHILL BED TRUCK DRIVER,CRANE OPERATOR AND TRUCK PUSHER,BP HSE,TP,WSLAND SCS. 03:00 - 06:00 3.00 DRILL N SFAL 9,920.00 PROD1 MAKE PICK OF POWER PACK ROOF AND SET ION GROUND. i LIFT POWER PACK AND LOWER TO FLAT BED TRUCK,SECURE AND SEND TO SLB SHOP I FOR REPAIR. CONTINUE CIRCULATING COIL AT 9478'AT 0.5 BPM. — -- — --- ------ 06:00 - 06:30 0.50 DRILL N SFAL IF' 9,921.00 PROD1 !CREW CHANGE. DISCUSS RIG REPAIR PROJECTS AND CURRENT OPS. MAKE EQUIPMENT CHECKS AND ROUNDS. PLAN PROCEDURE TO INSTALL PUMP#2 TRACTION MOTOR. f 'CONTINUE TO CIRCULATE WITH PUMP#1. '890 PSI AT 0.54 BPM IN/OUT IA/OA/PVT:94 PSI/621351/457 BBLS. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 5 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: ---------- Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) — —� (usft) ` 06:30 - 18:00 11.50 DRILL N SFAL 9,921.00 PROD1 HOLD DETAILED PJSM. REMOVE PUMP ROOM WALL WITH LOADER. PLACE AND ALIGN TRACTION MOTOR ON PUMP SKID. , RE-INSTALL PUMP ROOM WALL. INSTALL MISC WALL HANGINGS. SPLICE EXTENSION OF MOTOR POWER CABLES. MU ACCESSORIES ON TRACTION MOTOR. SLB- CONTINUE POWER PACK REPAIRS IN DEADHORSE. REMOVE AND DISASSEMBLE GEAR BOX. ROUND UP COMPONENTS TO REBUILD COUPLING BETWEEN TRACTION MOTOR AND I P14 PUMP. , REBUILD SAME. I 'CONTINUE TO CIRCULATE WELL THROUGH COIL. 901 PSI @ 0.57 BPM. PVT:456 BBLS. 18:00 - 22:30 4.50 DRILL I N SFAL 9,921.00 i PROD1 CONNECT ELECTRICAL WIRING ON MUD I PUMP#2.REVIEW TETING PROCEDURE FOR i ' !MUD PUMP. I I CONTINUE REPAIR WORK ON POWERPACK !AT SLB SHOP. CIRCULATE COIL AT 9478'WITH 0.5 BPM AT 900 PSI. 22:30 - 00:00 1.50 DRILL N 1 SFAL 9,921.00 PROD1 I PJSM,BRING MUD PUMP#2 ONLINE SLOWLY INCREASING RATE TO DRILLING RATE OF 2.65 BPM AT 1900 PSI.RECORD MOTOR TEMPERATURES ACCORDING TO PROCEDURE. ONGOING POWERPACK REPAIR. 2/16/2013 00:00 04.00 4.00 DRILLN SFAL : 9,920.00 '', PROD1 TEST MUD PUMP#2 CIRCULATING DOWN COIL AT DRILLING RATE.INCREASE RATE TO 3 BPM,CONFIRM PUMP OPERATING I PROPERLY.CIRCULATE AT 2.5 BPM AT 1785 PSI. j POWERPACK REPAIR WORK AT SLB SHOP. 04:00 - 06:00 2.00 DRILL N SFAL 9,920.00 PROD1 -REPAIRED POWERPACK BACK TO RIG.SPOT CRANE FOR LIFT. 06:00 - 07:30 1.50 DRILL N SFAL 9,921.00 PROD1 CREW CHANGE. DISCUSS CURRENT OPS AND RIG STATUS. WAIT ON SLT MTG CHANGEOUT. WAIT ON CH2MHILL CRANE CREW CHANGE OUT CONDUCT PJSM FOR LIFT WITH CREWS, ;LEADERSHIP,ADW HSE ADVISOR. _ 07:30 - 09:00 1.50 I DRILL N SFAL 9,921.00 PROD1 W LIFT AND SPOT POWERPACK ON RIG. j I LIFT AND SECURE ROOF ON PP ENCLOSURE. ' I RIG DOWN CRANE. 09:00 - 14:00 5.00 DRILL N 1SFAL t 9,921 00 PROD1 HOLD PJSM WITH SLB MECHANICS. BEGIN HOOK UP OF ELECTRICAL AND FLUID 'SYSTEMS TO POWER PACK. MAKE ELECTRICAL AND PRESSURE CHECKS. !ACTIVATE POWERPACK. TEST PULL IN AND I OUT OF HOLE. :ADJUST AS REQUIRED. SLB MECHANICS I SIGN OF ON SYSTEM Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 6 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To 1 Hrs Task Code NPT NPT Depth Phase I Description of Operations 14:00 - 14:30 0.50 DRILL P i T PROD1 i LOG GR TIE IN FROM 9520'. ADD 1' I CORRECTION. SPR'S:#1 1000 PSI/1498 PSI 0.5/1.0 BPM I I ! #2: 1025 PSI/1483 PSI 0.5/1.0 BPM !AT 9850'. II RUN IN HOLE. 14:30 - 17:00 I 2.50 DRILL I P PROD1 :DRILL AHEAD FROM 9921'. 2460 PSI FS AT 2.76 BPM IN/OUT. 200-300 PSI I MTR WORK. DHWOB:2-3K# 1 � 1 MW IN/OUT:8.63/8.74 PPG. PVT:452 BBLS. I IA/OA:417 PSI/172 PSI. BHP/ECD/TVD:4505 j PSI/9.72 PPG/8918'. ! _ DRILL AHEAD TO 10108'. C 17:00 - 19:30 I 2.50 DRILL P PROD1 WIPER TRIP TO WINDOW. PVT:449 BBLS. 19:30 - 20:00 j 0.50 ( DRILL P PROD1 P4SM FOR BHA 1I FLOW CHECK WELL,GOOD. I I I PICK UP INJECTOR 120:00 - 20:45 0.75 DRILL P PROD1 BLOWDOWN AND LAY DOWN BHA#2 I BIT RATED 1-1. 120:45 - 22:15 1.50 j DRILL P PROD1 TEST BAKER CHECKS TO 250/3500 PSI FOR 5 ' i ,CHARTED MIN 1 j PICK UP LATERAL BHA#3 WITH REBUILD HYC 1 13.75"X 4.25"BIT. I ! I GET ON WELL.PRESSURE TEST QTS TO ! iI 250/3500 PSI. 22 15 - 00:00 1.75 DRILL P ; PROD1 RIH WITH LATERAL BHA. 2/17/2013 100:00 - 00:20 1 0.33 DRILL P . PROD1 TIE-IN AT WINDOW WITH(-22)'CORRECTION. 00:20 - 00:50 I 0.50 DRILL P PROD1 j RIH TO DRILLING DEPTH. I I GET SPRS AT 10115' PUMP 1:0.5 BPM=1000 PSI,1.0 BPM=1215 PSI,2.5 BPM=2186 PSI PUMP 2:0.5 BPM=998 PSI,1.0 BPM=1200 1_-_ _ I PSI,2.5 BPM=2146 PSI 00:50 - 03:30 1 2.67 DRILL I P PROD1 1 DRILL AHEAD FROM 10,115'PUMPING 2.6 BPM I IN/OUT AT 2340 PSI,3.3K#DHWOB AT 40-50 FPH ROP.9.66 PPG ECD WITH 8.6 PPG j POWERVIS 'PVT 480 BBLS,IAP 600 PSI,OA 360 PSI 03:30 - 06:00 2.50 DRILL P PROD1 ROP SLOWS TO 17 FPH AT 10180'.PUMPING 2.6 BPM IN/OUT AT 2400 PSI. ' ROP INCREASE TO 40-50 FPH AT 10200'. • AIMING FOR 5 FEET DEEPER THAN PLAN PER GEO. PVT 477 BBLS,IAP 650 PSI,OA 371 PSI I 06 00 - 06 30 0.50 DRILL P PROD1 'CREW CHANGE. DISCUSS CURRENT OPS. :MAKE CHECKS AND ROUNDS. MEET WTIH SLB SLICKLINERS TO DISCUSS SIMOPS ON 6-228. :RECORD SPRS AT 10,250': !PUMP 1:0.5/1.5 BPM 1050/1490 PSI PUMP 2:0.5/1.5 BPM 1025/1550 PSI CONTINUE TO DRILL AHEAD. 06:30 - 06:45 0.25 DRILL P j ' PROD1 I DRILL AHEAD TO 10,300' 11 II 12358 PSI FS AT 2.71 BPM IN/OUT. IA/OA:719 PSI/448 PSI. DRILL TO 10,300'. Printed 4/1/2013 2•24•26PM North America-ALASKA-BP Page 7 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) i Project:Prudhoe Bay I Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor NORDIC CALISTA UW: Active datum:Kelly Bushing/Rotary Table @74.0ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) ! .-- I (ate) 06:45 - 07:30 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW PVT:472 BBLS. 2366 PSI AT 2.71 BPM IN. 07:30 - 15:00 7.50 DRILL P PROD1 DRILL AHEAD FROM 10,300'. • 2442 PSI FS AT 2.72 BPM IN/OUT. 2-3K# I DHWOB. j SOFT SAND. HIGH ROP. MAKE 200'WIPER TRIPS AS NEEDED. I DRILL AHEAD TO 10,700'. 15:00 - 16:301.50 DRILL P PROD1 ,WIPER TRIP FROM 10,700' 12047 PSI AT 2.26 BPM IN. ' LOG GR TIE IN.NO CORRECTION. ' BEGIN MUD SWAP PROCESS._ - - 16:30 - 18:30 r 2.00 1 DRILL P PROD1 !DRILL AHEAD FROM 10,700'. 2476 PSI AT 2.74 BPM IN/OUT. I DHWOB:3.5-4.5K# 400-600 PSI MTR WORK 'CONTINUE MUD SWAP. 18:30 - 21:30 3.00 DRILL P PROD1 DRILL TO 10,925' 3090 PSI AT 2.7 BPM IN/OUT,9.67 PPG ECD 2.8-4.OK#DHWOB WITH 30-40 FPH ROP PVT 313 BBLS,IAP 290 PSI,OAP 315 PSI 21:30 - 23:30 2.00 DRILL P PROD1 WIPER TRIP TO WINDOW , 'RIH SHUT DOWN PUMP TO GET THROUGH SHALE AT 10,633'. j 'GET SPRS AT 10925' PUMP 1:0.5 BPM=1351 PSI,1.0 BPM=1545 PSI,2.5 BPM=2552 PSI PUMP 2:0.5 BPM=1304 PSI,1.0 BPM=1553 +PSI,2.5 BPM=2535 PSI 23:30 - 00:00 I 0.50 DRILL P PROD1 DRILL AHEAD FROM 10,925 TO 10950' 2940 PSI AT 2.7 BPM IN/OUT,9.67 PPG ECD '2.4-4.OK#DHWOB WITH 65-80 FPH ROP PVT 301 BBLS,IAP 327 PSI,OAP 331 PSI 2/18/2013 00:00 - 03:00 3.00 DRILL P PROD1 DRILL FROM 10,950'TO 11025'. BHA WIPER AT 11025 DRILL AT 2.7 BPM IN/OUT AT 2940 PSI WITH • '2-3K#DHWOB. ' ROP 50-70 FPM. i DRILL TO 11150'. 'LOSSES 3 BPH WHILE DRILLING. 03:00 - 05:00 2.00 DRILL P PROD1 WIPER TRIP TO WINDOW I TIE-IN AT RA TAG WITH(+1)'CORRECTION. • LOWER PUMP RATE TO 1.3 TO GET TH UGH 105:00 - 06:00 1.00 DRILL , P + PRODI DRIRLOL AHEAD ATE,150'633'. • 2.67 BPM IN/OUT AT 2920 PSI 9.67 PPG ECD,3.3-4.4K#DHWOB PVT 436 BBLS AFTER TAKING ON 150 BBLS I MORE MUD I IAP 420 PSI,OAP 428 PSI. 06:00 - 06:30 0.50 DRILL P ' PROD1 :CREW CHANGE. DISCUSS OPERATIONS AND RIG STATUS. MAKE EQUIPMENT CHECKS I !AND OUTSIDE ROUNDS. 1 CONTINUE TO DRILL AHEAD. ' 06:30 - 10:30 I 4.00 DRILL P PROD1 1 DRILLAHEAD FROM 11,234. ' '2960 PSI FS AT 2.67 BPM IN/OUT. 300-450 PSI • MTR WORK. DHWOB:3.5-4.5K# MW IN/OUT:8.64/8.70 PPG. BHP/ECD/TVD: 4733 PSI/9.67 PPG/8966'. IA/OA/PVT:424 PSI/438 PSI/424 BBLS Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 8 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 • End Date:2/28/2013 X3-01300:(3,525,534.00) • Project:Prudhoe Bay ' Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor.NORDIC CALISTA 1 UW: Active datum:Kelly Bushing/Rotary Table©74.O0usft(above Mean Sea Level) Date From-To Hrs • Task • Code NPT NPT Depth 1 Phase I Description of Operations •__ (hr) --— -1- l (usft) t 10:30 - 12:30 2.00 DRILL P PROD1 WIPER TRIP TO WINDOW. i 1 PVT:398 BBLS. I SHALE BOBBLES AT 10,166',10,275',10,634'. 1 NONE REQUIRED HAVING TO PICK UP. LOG GR TIE IN ADD 2'CORRECTION. I HOLD KICK WHILE TRIPPING DRILL. GOOD • I RESPONSE TO SIMULATED PIT GAIN. ALL NOTIFICATIONS MADE. HOLD AAR IN OPS !CAB TO REVIEW. — 12:30 - 15:30 3.00 DRILL P PROD1 I DRILL AHEAD FROM 11,352'. • 12966 PSI AT 2.71 BPM IN/OUT. I !VERY SLOW DRILL OFF. 150 PSI MTR WORK 'MAX. 'GEO REPORTS SOFT MUSHY SHALE. 15:30 - 16:30 1.00 DRILL P PROD1 PJSM FOR TRIP OUT. I POOH FOR BIT/BHA CHECK. I_ PVT:380 BBLS. 16:30 - 18:15 1 1.75 DRILL P I PROD1 FLOWCHECKAT WINDOW. j OPEN EDC. I CIRCULATE OUT OF HOLE. 118:15 - 19:00 0.75 DRILL P PROD1 PJSM FOR BHA. [FLOW CHECK AT SURFACE,NO FLOW. j CLOSE EDC,POWER DOWN TOOL. LAY DOWN DRILLING BHA,BIT RATED 2-1 ' ! j WITH SEVERAL CHIPPED CUTTERS ON THE -- j NOSE. __ ____ 19:00 - 19:30 0.50 DRILL P PROD1 FUNCTION TEST BOPE FROM DRILLERS REMOTE PANEL.ALL EQUIPMENT • • FUNCTIONED PROPERLY. 19:30 - 20:30 1.00 DRILL P ! PROD1 PICK UP BHA#4 WITH REBUILD HYC 3.75°X I ! 4.25"AND SAME MOTOR.INSTALL AND j CALIBRATE UTIM. GET ON WELL,PRESSURE TEST QTS TO I 250/3500 PSI. 20:30 - 00:00 3.50 i DRILL P PROD1 RIH WITH BHA#4,TIE IN WITH-18 CORRECTION 2/19/2013 00:00 - 03:00 3.00 DRILL P PROD1 1 DRILL AHEAD FROM 11,358'. I FREESPIN 3000 PSI,2.7 BPM IN/OUT I ROP 2-7 FPH WITH 2-3K#DHWOB. IAP 530 PSI,OAP 220 PSI,PVT 360 BBLS I NO LOSSES. DRILL TO 11385'. 03:00 - 07:00 4.00 DRILL P + PROD1 !DRILL AHEAD WITH SLOW ROP AT 11,385'. i INCREASE ANGLE TO COME UP OUT OF t1 SHALE. _ 12.62 BPM IN/OUT,3100 PSI,2.5K#DHWOB. 07:00 - 07:30 0.50 DRILL P PROD1 ;CREW CHANGE. DISCUSS OPERATIONS AND !RIG STATUS. • ___ ' _ CONTINUE TO DRILL AHEAD FROM 11,450'. 07:30 - 14:00 6.50 ( DRILL P PROD1 DRILL AHEAD FROM 11,450'. ,3000 PSI FS AT 2.76 BPM IN/OUT. 300-400 PSI j 'MTR WORK. DHWOB:4.5K#. I i I MW IN/OUT:8.89/8.72 PPG. IA/OA/PVT:735 PSI/404 PSI/350 BBLS. !BHP/ECD/TVD:4838 PSI/10.41 PPG/8982'. DRILL WITH HS TOOLFACE TO CONTINUE I I BUILD. ;DRILL AHEAD TO DETERMINE WHERE WE ' 1 I I ARE. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 9 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 IX3-01300:(3,525,534.00) Project Prudhoe Bay i Site:PB DS 06 I Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTAI UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) i (usft) •14:00 - 16:00 2.00 DRILL - P PROD1 MAKE 500'WIPER TO WINDOW. 2935 PSI FS AT 2.64 BPM IN. PVT:430 BBLS. ' •FLOW CHECK. HOLD PJSM. — - . --- 16:00 - 17:30 1.50 DRILL P PROD1 OPEN EDC. CIRCULATE OUT OF HOLE. 17:30 - 18:00 I 0.50 DRILL P PROD1 AT SURFACE. FLOW CHECK. PJSM. GET - !OFF WELL. UNSTAB COIL. _ I LD DRILLING BHA AND TOOLS. 18:00 - 19:30 1.50 STWHIP C 11,584.00 P• ROD1 HOLD PJSM.W/BTT HAND. BRING !ALUMINUM BILLET BHA TO RIG FLOOR. _ CLEAN AND CLEAR RIG FLOOR. 19:30 - 21:00 1.50 STWHIP C 11,584.00 ' P• ROD1 1 HOLD PJSM AND M/U BTT ALUMINUM BILLET I BHA.P/T QTS. 21:00 - 23:30 2.50 STWHIP - C 11,584.00 PROD1 HOLD PJSM AND RIH W/BTT ALUMINUM BILLET BHA TO 8909'MD. LOST COMMUNICATION W/MWD TOOLS. 23:30 - 00:00 0.50 STWHIP !.- X DFAL 11,584.00 PROD1 HOLD PJSM AND START TO POOH W/BTT j ;ALUMINUM BILLET BHA TO TROUBLESHOOT COMMUNICATION FAILURE. 2/20/2013 00:00 - 01:30 1.50 I STWHIP X DFAL 11,584.00 PROD1 WASH OUT OF HOLE W/BTT ALUMINUM BILLET BHA Fl 8909'TO 74'. !PUMP RATE:48 SPM,1.6 BPM j MICRO MOTION OUT:1.2 BPM — _ I r-. !PUMP PRESSURE:1600 PSI 01:30 - 02:00 1 0.50 STWHIP X DFAL • 11,584.00 PROD1 IUD BTT ALUMINUM BILLET BHA F/74'TO i ISURFACE. 02:00 - 02:30 0.50 STWHIP P 11,584.00 I PROD1 PERFORM COIL MANAGEMENT.CUT 50'OF _SLB COIL. 02:30 - 05:00 i 2.50 STWHIP P 11,584.00 PROD1 REHEAD SLB COIL CONNECTOR AND BAKER REAL TIME CONNECTION HEAD. PULL/ PRESSURE TEST SAME-OK. 05:00 - 06:00 1.00 STWHIP P 11,584.00 PROD1 HOLD PJSM AND M/U BTT ALUMINUM BILLET BHA F/SURFACE TO 74'. PRESSURE TEST QTS. 06:00 - 06:30 0.50 STWHIP X DFAL 11,584.00 PROD1 'CREW CHANGE. DISCUSS CURRENT AND PAST OPERATIONS. MAKE ALL EQUIPMENT CHECKS. i PJSM TO CONTINUE OPS. GET ON WELL. PT QTS SUB. PASSED. 06:30 - 10:00 ! 3.50 ' STWHIP ! X . DFAL 11,584.00 PROD1 ,RUN IN HOLE. MAXRUNNING SPEED:70 FPM. 10:00 - 10:30 I 0.50 STWHIP C PROD1 LOG GR TIE IN FROM 9250'. 10:30 - 12:00 1.50 STWHIP C PROD1 CLOSE EDC. RUN IN OPEN HOLE. 35K#UP,18K#DN WT. j I UNABLE TO GET PAST SILTY SHALE AT 10170' • ;I WORK PIPE SEVERAL TIMES. SET DOWN 1 MAX AND THEN SOME AS PER BTT REP. _ _ —_ ! I NO PROGRESS. 12:00 - 13:30 1.50 STWHIP C i PROD1 I PULL OUT OF HOLE SLOWLY. WAIT ON NEW BILLET SETTING DEPTH FROM TOWN. 13:30 - 14:00 i 0.50 i STWHIP ; X DPRB 11,050.00 i PROD1 RIH. SET BILLET TOP AT 10050'. 1 !PRESS COIL. TOOLACTIVATED/SETAT 3400 l PSI. SET DN 2K# j I PU. OFF BILLET. ! BILLET SET 20 DEG RHS ORIENTATION. — — -- 14:00 - 16:00 2.00 I STWHIP X DPRB , 11,050.00 PROD1 HOLD PJSM.FLOW CHECK AT WINDOW. CIRCULATE OUT OF HOLE. Printed 4/1/2013 2:24-26PM North America-ALASKA-BP Page 10 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:2/11/2013 End Date:2/28/2013 IX3-01300:(3,525,534.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 ' Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor.NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT , NPT Depth Phase Description of Operations (hr) (usft) 1 16:00 - 16:30 ' 0.50 STWHIP X DPRB 11,050.00 I PROD1 AT SURFACE.HOLD PJSM. FLOW CHECK. I I I I I GET OFF WELL. UNSTAB COIL. LD BHA _ • !TOOLS. 16:30 - 17:30 1.00 1 STWHIP X DPRB 11,050.00 PROD1 I HOLD PJSM. M/U BHA#7(BILLET I j SIDETRACK BHA). __ _ GET ON WELL. P/T QTS SUB-GOOD. — 117:30 - 20:15 2.75 STWHIP X DPRB 11,050.00 PROD1 I HOLD PJSM AND RIH W/BHA#7 TAG BILLET _.-_—_— I ,_�AT 10,052'MD. 20:15 - 22:15 2.00 STWHIP X DPRB 11,050.00 PROD1 START TIME DRILLING BILLET F/10,052'MD AT -1FT/HR TO 10,054'MD. I PUMP RATE:2.46/2.44 BBL/MIN PUMP PRESSUE:2935 PSI ECD:10.16 1 I I WOB:5KLBS MW IN/OUT:8.71 PPG/8.75 PPG i PVT:421 BBL APPROXIMATELY 85%ALUMINUM IN CUTTINGS ON SHAKERS. 22:15 - 00:00 1.75 STWHIP X DPRB 11.050.00 PROD1 I CONTINUE TO DIRECTIONAL DRILL SIDE TRACK F/10,054'MD TO 10,085'MD. I AVERAGE ROP:17.71 FT/HR I PUMP RATE:2.64/2.62 BBLIMIN PUMP PRESSURE:2975 PSI ECD:10.19 WOB:1-2 KLBS I i •MW IN/OUT:8.71 PPG/8.76 PPG II PVT:421 BBL I APPROXIATELY 20%ALUMINUM IN CUTTINGS ON SHAKERS. • 2/21/2013 00:00 - 03:30 3.50 DRILL X DPRB 11,050.00 PROD1 I CONTINUE TO DIRECTIONAL DRILL SIDE I TRACK F/10,085'MD TO 10,216'MD. AVERAGE ROP:37.42 FT/HR j PUMP RATE:2.64/2.62 BBL/MIN 1 1 PUMP PRESSURE:3150 PSI ECD:10.19 I WOB:1-2 KLBS ! MW IN/OUT:8.71 PPG/8.76 PPG I PVT:421 BBL I APPROXIATELY 1%ALUMINUM IN CUTTINGS ON SHAKERS. PERFORM MUD SWAP WITH 580 BBLS NEW _ • ____ W __POERVIS MUD 03:30 - 06:00 2.50 I DRILL X T DPRB 11,050.00 I PROD1 !DRILLED TO 10,216'MD PER PLAN.POOH TO I LD KICK OFF ASSEMBLY&PU LATERAL ASSEMBLY. i FLOW CHECK-WELL STATIC. j !POOH F/10,216'-80'MD. j I 1 FLOW CHECK-WELL STATIC. LD LATERAL BHA#7. 06:00 - 06:30 0.50 DRILL X DPRB 11,050.00 PROD1 CREW CHANGE. DISCUSS OPERATIONS. MAKE EQUIPMENT CHECKS AND ROUNDS. HOLD PJSM TO CONTINUE BHA CHANGE. _ 06:30 - 07:00 0.50 DRILL X j DPRB 11,050.00 ! PROD1 I CONTINUE TO MU LATERAL BHA W/1.2 AKO AND RERUN HYCALOG BICENTER BIT. j STAB COIL. TEST TOOLS. GET ON WELL. PRESS TEST QTS:PASSED. 07:00 - 09:00 2.00 DRILL X DPRB 11,050.00 PROD1 RUN IN HOLE. EDC OPEN. CIRC AT MIN RATE. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 11 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor.NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date IFrom-To Hrs Task Code ! NPT 1 NPT Depth 1 Phase Description of Operations ---- (hr) T (usft) 109:00 - 09:30 0.50 i DRILLX ! DPRB 11,050.00 PROD1 LOG GR TIE IN. SUBTRACT 17'CORRECTION. I WIPER IN HOLE. PASS BILLET AT MIN RATE W/2OR TF. j RECORD SPR'S AT 10150'. I#1 0.5/1.0 BPM 1320/1540 PSI #2 0.5/1.0 BPM 1310/1530 PSI. 09'30 - 13 30 4.00 DRILL X DPRB 11,050.00 PROD1 DRILL AHEAD FROM 10,216'. 2920 PSI FS AT 2.69 BPM IN/OUT. 200-350 PSI MTR WORK. DHWOB:2.83 K# MW IN/OUT:8.59/8.65 PPG. BHP/ECD/TVD: 4611 PSI/9.93 PPG/8943'. -_. ,IA/OA:4/67 PSI. PVT:392 BBLS 13.30 - 14:30 1.00 DRILL i X DPRB 11,050.00 PROD1 WIPER TRIP TO WINDOW. HOLE SMOOTH.2750 PSI AT 2.68 BPM IN.PVT: j : �- 391 BBLS 14:30 - 16:30 2.00 DRILL 1 X � DPRB 11,050 00 PROD1 DRILL AHEAD FROM 10,400'. 2890 PSI FS AT 2.69 BPM IN/OUT. PVT:390 BBLS. DRILL TO 10,600' 16:30 - 17:30 1.00 DRILL X , DPRB ; 11,050.00 . PROD1 WIPER TRIP TO WINDOW. 2680 PSI AT 2.70 BPM. PVT:393 BBLS. HOLE • ' SMOOTH. _ _ 1730 - 21:30 i 4.00 DRILL X DPRB 11,050.00 PROD1 CONTINUE TO DIRECTIONAL DRILL SIDE TRACK F/10,600'MD TO 10,800'MD. AVERAGE ROP:50 FT/HR I PUMP RATE:2.7/2.66 BBL/MINI I !PUMP PRESSURE:3220 PSI ECD:10.17 i WOB:3-4 KLBS MW IN/OUT:8.67PPG/8.73 PPG 1 PVT:365 BBL 21:30 - 23:30 2.00 ' DRILL X DPRB 11,050.00 PROD1 PJSM,WIPER TRIP TO WINDOW,TIE IN+6.5 CORRECTION_ L - i I 23:30 - 00:00 0.50 DRILL X DPRB 11,050.00 PROD1 DRILL AHEAD F/10,800'MD TO 10,823'MD. AVERAGE ROP:46 FT/HR !PUMP RATE:2.7/2.66 BBL/MIN 'PUMP PRESSURE:3220 PSI ECD:10.17 I WOB:3-4 KLBS MW IN/OUT:8.67PPG/8.73 PPG PVT:365 BBL 2/22/2013 00:00 - 04:30 4.50 DRILL X DPRB 11,050.00 PROD1 DRILL AHEAD F/10,823'MD TO 11,005'MD. AVERAGE ROP:40.44 FT/HR PUMP RATE:2.7/2.66 BBL/MIN PUMP PRESSURE:3220 PSI ECD:10.17 WOB:3-4 KLBS I MW IN/OUT:8.67PPG/8.73 PPG PVT:365 BBL 04:30 - 06:00 1 1.50 DRILL X DPRB 11,050.00 PROD1 PERFORM WIPER TRIP F/11005'-10,160'MD. 06:00 - 06:30 0.50 DRILL X DPRB 11,050.00 PROD1 CREW CHANGE. DISCUSS RIG OPS AND STATUS. MAKE EQUIPMENT CHECKS AND 1 OUTSIDE ROUNDS. L - CONTINUE WIPER TRIP BACK TO BTM. 1 06:30 - 07:00 I 0.50 DRILL X DPRB 1 11,050.00 PROD1 DRILL AHEAD FROM 11,005'. 1 2840 PSI FS AT 2.67 BPM IN/OUT. 200-450 PSI ! I ; MTR WORK. DHWOB:2.85K# I MW IN/OUT:8.69/8.73 PPG. PVT:352 BBLS. ' IA/OA:109/183 PSI. BHP/ECD/TVD:4746 PSI/10.22 PPG/8961'. 07:00 - 10:15 3.25 DRILL C PROD1 DRILL AHEAD PAST PLANNED BILLET SETTING DEPTH OF 11,050'. DRILL AHEAD TO 11,200'. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 12 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 1X3-01300:(3,525,534.00) -_ Project:Prudhoe Bay Site:PB DS 06 ; Rig Name/No.:NORDIC 2 Spud Date/me:10/22/1982 12:00:00AM 1Rig Release:3/7/2013 _J- Rig Rig Contractor:NORDIC CALISTA j UWI: Active datum:Kelly Bushing/Rotary Table�j74.00usft(above Mean Sea Level) Date • From-To 1 Hrs 1 Task 1 Code , NPT NPT Depth Phase I Description of Operations - (hr) ! i (usft) I j 10:15 11:15 1.00 DRILL C PROD1 1 WIPER TRIP TO WINDOW. 2550 PSI FS AT 2.70 BPM. PVT:385 BBLS. 11:15 - 11:45 0.50 DRILL C ! PROD1 I LOG GR TIE IN FROM 9350'. i _ _ ADD 4'CORRECTION. 111:45 - 12:30 0.75 DRILL C PROD1 WIPER BACK TO BTM AT 2.0 BPM. 30 FPM. HOLE SMOOTH. 12:30 - 15:00 2.50 DRILL C PROD1 DRILL AHEAD FROM 11,200'TO 11,350'. 1 12650 PSI FS AT 2.75 BPM IN/OUT. VERY SLOW ROP. GEO REORTS HIGH%OF 1 1 CHERT IN SAMPLES. PLAN TO SWAP MUD. VAC TRUCKS ON THE WAY. 15:00 - 17:00 2.00 DRILL C PROD1 DRILL AHEAD FROM 11,350'. 2750 PSI FS AT 2.74 BPM IN/OUT. BEGIN NEW MUD DOWN COIL. ROP MODERATE BUT WEIGHT TRANSFER IS I STILL DIFFICULT DESPITE NEW MUD. -- 1 i 1 DRILL AHEAD TO 11,426'. 117:00 - 18:00 1 1.00 DRILL i C PROD1 i WIPER TRIP TO 10,160'. 2552 PSI AT 2.75 BPM IN. 18:00 - 20:30 2.50 I DRILL ! C : � PROD1 1 DRILLAHEAD FROM 11,426'TO 11,451'MD. j I PERFORM BHA WIPER,ROP DROPPING OFF 1 1I j G RAPIDLY. INCREASE WOB WITH NO INCREASE IN 'MOTOR WORK NOT SEEING GOOD WEIGHT TRANSFER TO BIT,POOH. 20:30 - 23:30 I 3.00 DRILL C PROW PJSM,POOH F/11,451'-80'MD. i FLOWCHECKAT WINDOWAND AT SURFACE. 23:30 - 00:00 0.50 DRILL C PROD1 1 LD BHA#8,CHANGE OUT DIRECTIONAL 1i MOTOR&BIT. 2/23/2013 00:00 - 01:30 1.50 DRILL C PROD1 CHANGE OUT DIRECTIONAL TOOLS. LD BIT,MOTOR AND MWD TOOLS. f 1 PU NEW HYCALOG BIT,DIR MOTOR AND RE-RUN SAME MWD TOOLS. GET ONTO WELL WITH INJECTOR,TEST QTS -GOOD. 01:30 - 05:00 1 3.50 DRILL C I PROD1 RIH F/90'-9850'MD.LOG TIE-IN WITH(-20.5') CORRECTION. : ;CONT RIH TO 11451'MD.FAN BOTTOM WITH 1 NEW BIT WITH 0-1 WOB. 1 SLOWLY INCREASE WOB WHILE BREAKING 1 i - 1I NEW____BIT. 05:00 - 06:00 1.00 ! DRILL C PROD1 i _r__ 05:00 F/11,451'MD TO 11,500'MD. 1 AVERAGE ROP:49 FT/HR j ;PUMP RATE:2.57/2.57 BBL/MIN 1 ! !PUMP PRESSURE:3003 PSI ECD:10.30 1 j WOB:2-3 KLBS 1 1 MW IN/OUT:8.57PPG/8.65 PPG __ � _ _ :PVT:328 BBL 06:00 - 06:50 0.83 DRILL C PROD1 'DRILL AHEAD F/11,500'MD TO 11,514'MD. I AVERAGE ROP:16.86 FT/HR 1 PUMP RATE:2.57/2.57 BBL/MIN 1 PUMP PRESSURE:3003 PSI ECD:10.30 WOB:2-3 KLBS I MW IN/OUT:8.57PPG/8.65 PPG 1 I 1 - PVT:324 BBL - Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 13 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) I I Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM I Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA !UWI:_ Active datum:Kelly Bushing/Rotary Table©74.00usft(above Mean Sea Level) Date From-To Hrs Task : Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 06:50 - 08:00 1.17 I DRILL X DPRB 11,514.00 PROD1 DRILLING AHEAD©11,515'MD WHEN MOTOR TORQUES UP AND STALLS OUT. I PU OFF BOTTOM,WIPE BACK 10-15'TO I j CLEAR CUTTINGS FROM HOLE. I SLACK OFF TO 11,541'MD,STALL IN OPEN HOLE. I ATTEMPT TO PU,UNABLE TO MOVE. . j ; REDUCED PUMP RATES,ATTEMPT TO WORK PIPE FREE,CALL FOR MINERAL OIL. 1 FINISH CIRCULATING BTMS UP. RELAX HOLE FOR 15 MINUTES. PULL FREE AT 55K#UP WT. 08:00 - 08:30 , 0.50 DRILL C PROD1WIPER TRIP TO 11,300'. PVT:320 BBLS. _ 13230 PSI AT 2.72 BPM. 08:30 - 11:30 3.00 I DRILL P PROD1 DRILL AHEAD FROM 11,515. 3220 PSI AT 2.71 BPM IN/OUT. 200-350 PSI MTR WORK. DHWOB:1.72K# MW IN/OUT: 8.62/8.62 PPG. IA/OA:23/84 PSI. PVT:316BBLS. BHP/ECD/TVD:4633 PSI/10.30 PPG/8964'. 11:30 - 13:30 2.00 DRILL P PRODIWIPER TRIP TO 10160'. 13170 PSI FS AT 2.61 BPM IN. PVT:290 BBLS. ; y HOLE SMOOTH. 13:30 - 14:45 1.25 !! DRILL P PROD1 ,DRILL AHEAD FROM 11,649'. _,_ _ i - I BECOME BIT/DIFF STUCK AT 11,694'. 14:45 15:15 I _ _ 0.50 DRILL N I DPRB 11,695.00 PROD1 I RELAX HOLE. PULL 4 TIMES TO 62K#. ! DHWOB SHOWS-6K#. ( POP FREE. WIPER TO 11496'. 15.15 - 18:00 ! 2.75 I DRILL j P PRODI �DRILL AHEAD FROM 11,649'. 3050 PSI AT 2.71 BPM IN/OUT. 200-250 PSI I MTR WORK. DHWOB:2.3K#. 18:00 - 20:00 2.00 DRILL P j PROD1 DRILL AHEAD FROM 11,850. :3535 PSI AT 2.71/2.65 BPM IN/OUT. 200-350 PSI MTR WORK. DHWOB:4-5K# MW IN/OUT: 8.67/8.72 PPG. I IA/OA:186/215 PSI. PVT:255 BBLS. !BHP/ECD/TVD:4740 PSI/10.30 PPG/8964'. • SAMPLE(rD 11,800'SHOWS 40%CHERT. ROP BEGINNING TO TAPER OFF. 20:00 - 21:15 1.25 DRILL I P 1 PROD1 DRILL F/11,850'-11,884'MD. - 14- 21:15 - 00:00 2.75 DRILL ! P I PROD1 WIPER TRIP F/11,884'-9,525'MD. TIE-IN W/(+11)CORRECTION. - x RIH TO BOTTOM DRILL PER PLAN. 2/24/2013 00:00 - 01:00 I 1.00 DRILL P I PROD1 ~PERFORM WIPER TRIP TO 9525'MD. I SMOOTH PICK-UP THRU LATERAL SECTION. I SMOOTH SLACK OFF BACK TO BOTTOM. I _ _ !NO TIGHT SPOTS ENCOUNTERED. 01:00 - 06:00 • 5.00 DRILL . P I PROD1 I DRILL AHEAD FROM 11,885. 13415 PSI AT 2.52/2.47 BPM IN/OUT. 200-350 I PSI MTR WORK. DHWOB:3-5K# I ; '!MW IN/OUT: 8.69/8.73 PPG. IA/OA:235/275 PSI. PVT:219 BBLS. I I BHP/ECD/TVD:4767 PSI/10.30 PPG/8964'. 06:00 06:30 0.50 DRILL r p - SAMPLE 11,950'SHOWS 25%CHERT. - - - - - PROD1 CREW CHANGE. CREWS DISCUSS JOURNEY 1 1 MANAGEMNT PLAN. DISCUSS CURRENT OPS. MAKE EQUIPMENT CHECKS. CONTINUE TO DRILL AHEAD. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 14 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) , Start Date:2/11/2013 I End Date:2/28/2013 1X3 -01300:(3,525,534.00) Project:Prudhoe Bay ' Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor.NORDIC CALISTA •L UWI: Active datum:Kelly Bushing/Rotary Table©74.00usft(above Mean Sea Level) Date From-To I Hrs Task Code • NPT ; NPT Depth Phase Description of Operations I (hr) ' (usft) _ _ 06:30 - 07:45 1 1.25 DRILL P PROD1 I DRILL AHEAD FROM 12,000'. 3410 PSI FS AT 2.59 BPM IN/OUT. 200 PSI MTR WORK. DHWOB:4-5K#. MW IN/OUT:8.70/8.72 PPG. PVT:214 BBLS PLUS 130 BBLS RESERVE. BHP/ECD/TVD:4806 PSI/10.3 PPG/8964'. I IA/OA:292/303 PSI. -.._- - - 1 __ DRILL AHEAD TO 12,001' 1.25 DRILL P PROD1 07:45 - 09:00 WT TRANSFER GOOD. ROP SLOW FOR SAND EVEN IN CHERT. WIPER TO WINDOW.HOLE SMOOTH. 09:00 - 11:00 2.00 DRILL P PROD1 FLOW CHECK.OPEN EDC. CIRCULATE OUT --- 1 �FHOLE. 11:00 - 12:00 1.00 DRILL 1 P PROD1 I AT SURFACE. FLOW CHECK. PJSM. TEST • AGITATOR. FUNCTIONAL BUT MAYBE WEAK. GET OFF WELL. UNSTAB COIL. I I BREAK DOWN BHA AND INSPECT SAME. MOTOR GOOD. BIT WORN AND BALLED UP. I — j GRADED 8-3. • 112:00 - 13:00 1.00 BOPSUR P ! PROD1 WEEKLY FUNCTION OF BOPS. I I REPLACE AND TEST COIL PACKOFF TO 250 1AND 3600 PSI. PASSED. 1 I 1 PT COIL CONNETOR TO CHECK FOR LEAKS. 13:00 - 14:00 1.00 DRILL P ! PROD1 ;PJSM. MU LATERAL DRILLING BHA W/1.2 1 DEG MTR W/HYC BICENTER. REPLACE !AGITATOR. ;STAB COIL. TEST TOOLS. GET ON WELL. PT _ 1QTS SUB. PASSED. '14:00 - 15:30 1.50 DRILL P 1 PROD1 RUN IN HOLE. — PREP PITS FOR MUD SYSTEM SWAP. 115:30 - 15:45 0.25 DRILL P 1 - PROD1 ,LOG GR TIE IN FROM 9250'. SUBTRACT 24' 1 'CORRECTION. CLOSE EDC. 15:45 - 17:15 I 1.50 DRILL P 1 ,• • PROD1 i RUN IN HOLE. •2567 PSI AT 1.96 BPM 17:15 - 18:30 i 1.25 DRILL P 1 • PROD1 DRILL AHEAD TO 12,012'. STALL. PU AND OVER PULL TO 51K#. ,• I MAKE 500'WIPER WHILE NEW MUD COMES AROUND. 18:30 - 21:30 3.00 DRILL P PROD1 DRILL4 1/8"HOLE F/12012'TO 12167'MD. WOB:1.5-3.0 KLBS PUMP PRESSURE: I I 2900-3100 PSI. PUMP RATE:2.71 BBL/MIN. FLOW OUT:2.70 BBL/MIN.MW IN/OUT: 8.58/8.65 PPG. GAMMA:22.5 API. 21.30 - 00:00 2.50 DRILL N DPRB 12.167.00 PROD1 UNABLE TO MOVE PIPE ON BOTTOM AT •12167'MD. CIRCULATE BOTTOMS UP THEN I RELAX WELLBORE F/5 MIN,ATTEMPT TO 1 PULL FREE-NO LUCK. RELAX WELLBORE F/ • 10 MIN,ATTEMPT TO PULL FREE-NO LUCK. RELAX WELLBORE F/15 MIN,ATTEMPT TO I PULL FREE-NO LUCK. PULL MAX 75K LBS. RELAX WELL BORE F/20 MIN ATTEMPT TO !PULL FREE-NO LUCK. 2/25/2013 00:00 - 01:00 1.00 DRILL N DPRB 12,167.00 !i' PROD1 !CONTINUE TO WORK TIGHT HOLE AT 12167'. ATTEMPT TO RELAX WELL AND PULL FREE 1 W/NO LUCK. MAX PULL 8OKLBS. STRING IS FREE AT BIT,ABLE TO FUNCTION HOT TO CHANGE TOOLFACE ORIENTATION. WAIT • FOR MINERAL OIL. Printed 4/1/2013 2:24:26PM ' North America-ALASKA-BP Page 15 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 1X3-01300:(3,525,534.00) -i • Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations -- (hr) (usft) 01:00 - 02:00 1.00 DRILL N DPRB 12,167.00 PROD1 HOLD PSJM TO SPOT MINERAL OIL AROUND BHA. PUMP 20 BBL OF MINERAL OIL AND CHASE W/52 BBL OF NEW MUD TO DISPLACE OIL FROM COIL. RELAX WELL F/ 20MIN AFTER SPOTTING MINERAL OIL. PULL FREE W/45 KLBS. 02:00 - 06:00 4.00 DRILL N DPRB 12,167.00 PROD1 WIPER TRIP TO WINDOW. LOG TIE IN +12' CORRECTION. PUMP RATE:2.65 BBL/MIN. PUMP PRESSURE:2800 PSI. MW IN/OUT: 8.58 PPG/8.6 PPG. FLOW OUT:2.45 BBL/MIN. ECD:10.30 PPG. IA/OA:67PSI/111PSI. 06:00 - 06:15I I 0.25 DRILL N DPRB 12,176.00 PROD1 CREW CHANGE. DISCUSS OPERATIONS AND RIG/EQUIPMENT STATUS. MAKE ALL CHECKS AND ROUNDS. COMPLETE WIPER. DRILL AHEAD TO 12,176'. BECOME STUCK ON BOTTOM. 06:15 - 07:30 1.25 DRILL N DPRB 12,176.00 PROD1 RELAX HOLE. PULL 60-72K#FOR SEVERAL 1 CYCLES. PUMP 10 BBLS MINERAL OIL. HOLD 55K#UP I I ii WT. POPPED FREE. :07:30 - 08:00 0.50 DRILL ; N DPRB 12,176.00 PROD1 WIPER TRIP TO 11,676'. j - BOP TEST WITNESS WAIVED BY JEFF JONES,AOGCC. 08:00 - 11:00 3.00 DRILL P i PROD1 DRILL AHEAD FROM 12,176'. 2900 PSI FS AT 2.71 BPM IN/OUT. 200-350 PSI •MTR WORK. DHWOB:2.5-4.0K# MW IN/OUT:8.56/8.63 PPG. PVT:277 BBLS. IA/OA: 82/145 PSI. 1 BHP/ECD/TVD:4473 PSI/9.88 PPG/8963'. i DRILL TO 12,263'. I BECOME STUCK. T 11:00 - 12:00 1.00 DRILL . N DPRB I 12,263.00 PROD1 I WORK PIPE TO 72K#AFTER RELAXING HOLE. ,PUMP 7 BBLS MIN OIL. PULL FRE AFTER SOAKING FOR 15 MINUTES. 12:00 - 13:45 1.75 DRILL 1 P PROD1 WIPER TRIP TO WINDOW. _ _ _- , 'HOLE SMOOTH. 13:45 - 14:00 0.25 DRILL P PROD1 LOG GR TIE IN. ADD 5'CORRECTION. 14:00 - 15:15 1.25 DRILL P PROD1 tRUN IN HOLE. I HOLE SMOOTH. _ 15:15 - 17:30 2.25 DRILL P PROD1 DRILL AHEAD FROM 12,263'. ' 2950 PSI AT 2.71 BPM IN/OUT. 150-300 PSI MTR WORK. DHWOB:2.0-3.5K# diFFICULT DRILLING DUE TO WEIGHT TRANSFER. CONTINUE MAKE FOOTAGE,A FEW FEET AT A TIME. STACKING A LOT OF SURFACE COIL WEIGHT, - ! _ BUT CONTINUES TO DRILL OFF. 17:30 - 18:00 0.50 j DRILL P PROD1 UNABLE TO GET MUCH MTR WORK EVEN WHEN HITTING BTM HARD. •POOH TO CHECK/REPLACE BIT. 118:00 - 19:15 1.25 DRILL P PROD1 'CONTINUE TO POOH TO CHECK/REPLACE BIT. PUMP OUT TO WINDOW-9460'. PUMP RATE:2.70 BBL/MIN,SPP:3170 PSI, FLOW OUT:2.51BBL/MIN,MW IN/OUT:8.62 l i _ PPG/8.68PPG. _ 19:15 - 19:30 0.25 j DRILL I P PROD1 'FLOW CHECK WELL-WELL STATIC.OPEN L.. I JI EDC. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 16 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UW: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To I Hrs Task ! Code NPT I NPT Depth Phase Description of Operations _ (hr) i _ ! I _ (usft) 19:30 - 21:00 1.50 DRILL ; P PROD1 1CONTINUE TO PUMP OUT OF HOLE F/9460' I TO 80'AT 90 FPM. PUMP IN:2.90 BPM,SPP: 3400 PSI,FLOW OUT:2.32 BPM,MW IN/OUT: 8.60PPG/8.61 PPG,ECD:10.3PPG 21:00 - 22:00 1.00 DRILL P PROD1 HOLD PJSM AND L/D BHA#10 F/80'. 22:00 - 00:00 2.00 DRILL P PROD1 HOLD PJSM FOR COIL MANAGEMENT. CUT 100'OF COIL. INSTALL COIL CONNECTOR AND PULL TEST SAME. 2/26/2013 00:00 - 01:00 1.00 DRILL P PROD1 COMPLETE COIL MANAGEMENT CUTTING COI. REHEAD AND PULL TEST COIL :CONNECTOR. 01:00 - 02:00 1.00 DRILL P PROD1 I CLOSE MASTER AND SWAB VALVES. LEAK TIGHT TEST OF SWAB. 02:00 - 05:00 3.00 DRILL 11 P , PROD1 LOCKOUT/TAG OUT ACCUMULATOR OPEN UP BOPE RAM DOORS AND INSPECT ELEMENTS. _ 05:00 - 07:00 2.00 DRILL 1. P • PROD1 1PRESSURE TEST ALL BOP EQUIPMENT AS --- ! ---- I PER PROCEDURE. 07:00 - 07:30 , 0.50 DRILL P PROD1 CREW CHANGE. DISCUSS BOP EST AND RIG/EQUIPMENT STATUS. - 'CONTINUE TO TEST BOPS. 07:30 - 14:00 6.50 DRILL P PROD1 j CONTINUE TO TEST BOPS AS PER PERMIT ITO DRILL,AOGCC REGS,AND WELLPLAN REQUIREMENTS. i 14:00 - 20:00 7 6.00 T DRILL N DPRB j 12,300.00 '', PROD1 OPEN SV,SSVAND MASTER-454 PSI 'WELLHEAD PRESSURE,SHUT BACK IN AND j WAIT ON ORDERS,BLEED WELL TO 350 PSI, SHUT IN AND MONITOR WELL I NOTE:BLED F/432-360 PSI.AFTER 5 MINS ! CLIMBS BACK TO 377 PSI.BLEED AGAIN TO j 330 PSI.AFTER 5 MINS CLIMBS BACK TO 359 PSI.CONTINUE TO MONITOR PRESSURE,NO 'MORE BLEEDS. 20:00 21:00 1.00 DRILL N DPRB 12,300.00 PROD1 1PJSM,SHUT MASTER AND SWAB,OPEN BLINDS AND BLEED OFF PRESSURE 21:00 - 21:30 0.50 DRILL N W DPRB ' 12,300.00 PROD1 PU INJECTOR STAB ON WELL AND TEST QTS. PUMPING DOWN THE CT TO PREVENT FREEZING THE CT WHILE PUMPING DOWN THE KILL LINE AT THE SAME TIME. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 17 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM 1 Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA ;UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (usft) 21:30 - 23:00 1.50 DRILL N DPRB 12,300.00 PROD1 RECEIVED OPERATIONS CHANGE NOTE#3. WELLHEAD PSI INCREASED F/454-710. PERFORM BULLHEAD KILL PER PROCEDURES 5BPM,PART DOWN THE CT ' AND PART DOWN THE KILL LINE. TIME: WHP: CIRC PSI: BBLS PUMPED: RATES:CT/KILL 21:30 568 2373 10 • 2/3BPM 21:40 1290 2941 36 I2/3BPM ,21:50 2080 3600 78 2/3BPM ' 22:00 1849 3384 128 ,2/3BPM 22:10 1732 3267 183 2/3BPM 22:20 1619 3153 235 !2/3BPM 22:30 1099 2630 285 2/3BPM 1 BULLHEAD 285 BBLS,SHUT DOWN AND _ —_ _LMONITOR FOR 30 MIN. 23:00 - 23:30 0.50 DRILL N DPRB 12,300.00 PROD1 '•:FLOW CHECK WELL-ON VAC 23:30 - 00:00 0.50 DRILL N DPRB ! 12,300.00 PROD1 FILL HOLE AFTER FLOW CHECK-12 BBLS RE-HEAD WITH BAKER. 2/27/2013 00:00 - 01:30 1.50 DRILL P 1 I PROD1 RE-HEAD COIL CONNECTOR WITH BAKER. _1 — -'- _ _ WELL TAKING FLUID.3-5 BBLS/15 MINS. -- 01 30 - 02:00 0.50 j DRILL P PROD1 :PRESSURE TEST BLIND RAMS-GOOD 02:00 - 02:30 0.50 . DRILL P PROD1 HELD PJSM TO MU BHA#12. MU BHA#12,GET INJECTOR ONTO WELL. I ! TEST QTS-GOOD. 02:30 - 06:00 3.50 DRILL P PROD1 RIH WITH LATERAL BHA#12 F/90'-9,450'MD. LOG TIE-IN WITH(-24')CORRECTION. RIH F/9,450'-11,500'MD. TAKING LOSSES WHILE RIH(-25)VS — _ CALCULATED. 06:00 - 08:30 2.50 DRILL : P : PROD1 CIRC BOTTOMS UP THROUGH MGS UNTIL CLEAN MUD COMING BACK,OUT DENSITY FLUCTUATING. 08:30 - 08:50 0.33 DRILL P , PROD1 I CLEAN MUD COMING BACK. RIH TO BOTTOM AND DRILL. DRILL FROM 12300 FTAT OL ORIENTATION. j 'S • LOW,ERRATIC ROP STACKING A LOT OF _�__,_._ SURFACE WT TO DRILL. — 08 50 - 09:40 0.83 DRILL P t - PROD1 I PVT=308 BBLS. IN/OUT=2.46/2.36 BPM, 8.63/8.63 PPG. 09 40 - 10:00 0.33 DRILL N DPRB I 12,327.00 PROD1 DRILL TO 12327 FT AND PICKUP. 10K ' OVERPULL OFF BOTTOM. CONTINUE PICKING UP,PULLING 60K AT 12300 FT WITH MOTOR STALL. CYCLE PIPE SEVERAL TIMES HERE,CAN'T GO UP OR DOWN. SHUT DOWN PUMP TO RELAX HOLE. ABLE TO TURN ORIENTER FREELY. I Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 18 of 18 Operation Summary Report Common Well Name:06-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/11/2013 End Date:2/28/2013 X3-01300:(3,525,534.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor.NORDIC CALISTA UWI. Active datum:Kelly Bushing/Rotary Table n74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 10:30 I 0.50 DRILL N I DPRB ; 12,327.00 I PROD1 CYCLE PIPE HERE 60K,65K,70K,PUSH DOWN EACH TIME AND POP FREE GOING DOWN. ' I PULL 200 FT WIPER. • . 1 DIFFICULTY PASSING SHALE AT 12280 FT. STACK WT AND OVERPULLS PICKING UP. PASS THROUGH AT REDUCED RATE. 10:30 - 12:30 2.00 DRILL P PROD1 DRILL FROM 12323 FT,CONTINUE LOW ROP WITH WEIGHT STACKING. I ' ,PVT=299BBLS. HOLD OL TF FOR NOW TO CONTINUE BUILDING ANGLE. 12:30 - 13:50 1.33 C DRILL P PROD1 ,CONTINUE DRILLING PAST 12420 FT. CONTINUE DRILLING 15R TF,INCLINATION I I NOW 111 DEG NEAR BIT. TRYING TO DRILL 1 UP THROUGH FINAL SHALE ZONE TO TD I WELL. .PVT=291 BBLS. IN/OUT=2.51/2.47BPM, 8.64/8.68 PPG. ECD=10.01 PPG. DRILL TO 12459 FT. 13:50 - 14:50 1.00 DRILL P PROD1 ,PULL 1000 FT WIPER TO TRY AND IMPROVE WT TRANSFER. DRILLING WITH-12K STRING WT- IOVERPULL TO 60K AT 12230 FT WITH MOTOR WORK. TENSION SEEN ON DWOB. TRY TO I RUN BACK IN HOLE,CAN'T GO UP OR DOWN. i CYCLE PIPE AND PUMP SEVERAL TIMES ,HERE,POP FREE PULLING UP WITH NO I PUMP. CONTINUE WIPER TRIP TO 11400 FT. 14:50 - 16.40 1.83 DRILL P PROD1 I DRILL FROM 12460 FT WITH-14K STRING I WEIGHT. INC IS 116 DEG. CONTINUE HOLDING 75R TF TO HOLD ANGLE. I PVT=281 BBS,ECD=10.01 PPG. 16:40 - 18:00 1.33 DRILL P PROD1 DRILL PAST 12530 FT WITH SLOW ROP. RECEIVE WORD FROM GEO THAT 12575 WILL BE TD. 18:00 - 23:00 5 00 DRILL P PROD1 DRILLED TO 12,578'TOTAL MEASURED DEPTH. 1 i PERFORM WIPER TRIP F/12,575'-9,525'MD. I LOGGED TIE-IN WITH(+7')CORRECTION. TIGHT SPOTS ENCOUNTERED F/10,730'- 11,035'MD. SET DOWN 10K PU AND WORK THRU ----.-__._ I INTERVAL 2-3 TIMES. 23:00 - 00:00 1.00 DRILL P T PROD1 LAY IN LINER PILL WITH BEADS. 1 POOH F/12,575'-10,847'MD. 2/28/2013 00:00 - 01:30 1.50 DRILL P PROD1 i POOH F/10,847'-5,500'MD. 01 30 - 04:00 2.50 DRILL N HMAN 9,600.00 PROD1 I WHILE POOH NOTICED THAT THE LINER CCL . HAD NOT BEEN LOGGED. • I RIH F/5,500'-9,600'MD.TIE-IN WITH(+7.5) • CORRECTION. MADE CCL LOGGING PASS F/9,600-9,200' IMD. POOH F/9,200'-5,500'MD. ;04:00 - 06:00 2.00 DRILL P I PROD1 I POOH F/5,500'-90'MD. LD LATERAL BHA#12. PREPARE FOR SLACK MANAGEMENT. Printed 4/1/2013 2:24:26PM North America-ALASKA-BP Page 1 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 End Date:3/7/2013 X3-01300:(1,321,359.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/28/2013 06:00 - 07:00 1.00 CASING P RUNPRD PREP RIG FLOOR FOR PUMPING OUT SLACK CREW CHANGE. REMOVE BHI CABLE HEAD AND SLB CT CONNECTOR. 07:00 - 07:30 0.50 CASING P RUNPRD PUMP 203 FT OF CABLE SLACK OUT,LEAVES ABOUT 67 FT AS PER SLB RECORDS.TRIM CABLE. 07:30 - 08:30 1.00 CASING P RUNPRD INSTALL BTT CT CONNECTOR.PULL TEST TO 38K,PRESSURE TEST TO 250/3500 PSI, GOOD. 08:30 - 09:20 0.83 CASING P RUNPRD M/U INJECTOR TO WELL,CLOSE SWAB VALVE.PUT 10 BBLS WATER IN REEL TO AID IN HEARING BALL ROLL.INSERT 3/4"DRIFT BALL AND PUMP IT AROUND. 09:20 - 10:30 1.17 CASING P RUNPRD RECOVER 3/4"BALL.OPEN SWAB AND FILL WELL WITH 2.7 BBLS.PREP RIG FLOOR TO RUN LINER. MAKE UP DRIFT FOR 2-7/8" LINER CONNECTIONS. SET INJECTOR ON LEGS. RIG UP FARR TONGS. CLEAR EXCESS EQUIPMENT AND TOOLS OFF RIG FLOOR. CHECK TORQUE ON SAFETY JOINT AND LIFT NUBBIN CONNECTIONS. 10:30 - 10:45 0.25 CASING P RUNPRD PJSM WITH ALL CREWS FOR M/U LINER. 10:45 - 15:00 4.25 CASING P RUNPRD M/U LINER AS PER LINER SUMMARY. DRIFT FIRST 5 CONNECTIONS INCLUDING STAGE COLLAR.HOLD KICK WHILE TRIPPING DRILL AFTER FIRST 3 JOINTS ARE RAN. 15:00 - 18:00 3.00 CASING P RUNPRD FINISHED 2-7/8"LINER,MAKE UP XO THEN 3.25"LINER. DRIFT FIRST 5 CONNECTIONS OF 3.25"LINER. CONTINUE TO MAKE UP AND RIH W/34 X JOINTS OF 3.25"6.6#L-80 LINER. M/U 3.5"ST-L BOX X 3.25"TC-II PIN X/O. i FINISH MAKING UP 3 1/2" LINER ASSEMBLY. 18:00 - 22:30 4.50 CASING P RUNPRD HOLD PJSM GET ON WELL MAKE UP INJECTOR AND TEST QTS-GOOD. RIH W/ LINER ASSEMBLY ON COIL TUBING F/3300'- 9433'MD.RECORD PU-40K SO-20K.MAKE (-30)DEPTH CORRECTION AT FIRST FLAG. CONT.RIH F/9403'-10,700'MD. 22:30 - 23:30 1.00 CASING N DPRB 12,379.00 RUNPRD WORK THROUGH TIGHT INTERVALS F/10700' TO 12379'.PU-50K SO--15K UNABLE TO GET DOWN PAST 12379'AFTER 1 HOUR. DECISION MADE TO SPOT 20 BBL OF MINERAL OIL. 23:30 - 00:00 0.50 CASING N DPRB 12,379.00 RUNPRD BEGIN TO PUMP 2OBBL OF MINERAL OIL AT 12379'MD. PUMP RATE:0.56 BPM,SPP:1720 PSI,FLOW OUT:0.54 BPM,MW IN/OUT 8.61 PPG/ 8.78PPG. Printed 4/1/2013 2:27:51PM North America-ALASKA-BP Page 2 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 End Date:3/7/2013 X3-01300:(1,321,359.00) —1_ Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:OOAM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 3/1/2013 00:00 - 02:30 2.50 CASING N DPRB 12,379.00 RUNPRD CIRCULATE 20 BBLS MINERAL OIL.SPOT 10 BBLS OUTSIDE LINER. ATTEMPT TO WORK LINER PAST 12,379'MD. PU-50K SO--15K NO PROGRESS MADE WHILE ATTEMPTING TO GET PAST THIS TIGHT INTERVAL. FINAL FLAG CAN BE SEEN WITH 4 WRAPS 'REMAINING BEFORE IT WAS REACHED. NOTIFIED ODE OF SITUATION:DECISION MADE TO POOH FOR A CLEAN OUT RUN. 02:30 - 06:20 3.83 CASING N DPRB 12,379.00 RUNPRD !POOH F/12,379'-5,000'MD. MM IN/MM OUT-0.58/0.41 MW-8.6/8.7,PU-42-48K LOSS RATE 2-3 BPH(LOSS 25 BBLS/10 HRS). 06:20 - 06:30 0.17 CASING N DPRB 12,379.00 RUNPRD CONTINUE POOH WITH LINER. TRIP SHEET IS-4 BBLS TO THIS POINT. 06:30 - 07:30 1.00 CASING N DPRB 12,379.00 RUNPRD TAG STRIPPER,FLOW CHECK WELL. PJSM FOR LAYING DOWN LINER. 15 MIN FLOW CHECK IS GOOD. AFTER 15 MIN,TAKES 1.1 BBLS TO FILL WELL. 07:30 - 09:25 1.92 CASING N DPRB 12,379.00 RUNPRD PULL 1ST JOINT OF PH6 OUT. GETTING USED MINERAL OIL BACK THAT IS SWAPPING OUT WITH THE MUD. .OBSERVE MINERAL OIL CAP INSIDE RISER. MAKE UP INJECTOR BACK ONTO WELL,CIRC MINERAL OIL OUT. 10 MIN FLOW CHECK IS GOOD. FILL WELL WITH 0.9 BBLS. 109:25 - 10:30 1.08 CASING N DPRB 12,379.00 RUNPRD POP OFF WITH INJECTOR. UD REMAINING 3 JTS OF PH6 AND SELRT TOOL. 10:30 - 15:50 5.33 CASING N DPRB 12,379.00 RUNPRD OFFLOAD SELRT TOOL FROM RIG TO GO TO BTT DEADHORSE FOR REDRESS. CONTINUE UD ALL 3-3/16"LINER. CHECK FLUID LEVEL IN WELL EVERY 30 MIN, FILL IF NECESSARY. 15:50 - 18:00 • 2.17 CASING N ' DPRB 12,379.00 i RUNPRD I FINISH UD LAST 2 JTS OF 2-7/8". FILL WELL WITH 3 BBLS. WELL TOOK 12 BBLS IN EXCESS OF METAL DISPLACEMENT WHILE PULLING LINER OUT. PJSM FOR PUMPING SLACK. 18:00 - 18:30 0.50 CASING N DPRB 12,379.00 RUNPRD PJSM WITH CREW FOR CUTTING COIL. 18:30 - 22:30 4.00 CASING N DPRB 12,379.00 RUNPRD CUT 250'OF COIL,PERFORM SLACK MANAGEMENT. MU SLB COIL CONNECTOR,PUMP SLACK •FORWARD. TEST LUBRICATOR,HEAD-UP WITH BHI. 22:30 - 00:00 1.50 CASING N DPRB 12,379.00 RUNPRD PJSM WITH CREW FOR MU BHA#14. MU BIT,MOTOR,AGITATOR 8,MWD TOOLS. GET INJECTOR ON WELL,TEST QTS-GOOD. Printed 4/1/2013 2:27:51PM North America-ALASKA-BP Page 3 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 End Date:3/7/2013 X3-01300:(1,321,359.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/2/2013 00:00 05:00 5.00 CASING N DPRB 12,379.00 RUNPRD RIH F/79'-9500'MD.TIE IN(-24') CORRECTION. BEGIN WASHING SLOWLY TO BOTTOM ENCOUNTERED LEDGES AT THE FOLLOWING DEPTHS.10903',12339', 12360',12379',&12445'MD. WORK THROUGH LEDGES WITH LITTLE TO NO MOTOR WORK. WIPE THROUGH LEDGE AREA'S 2-3 TIMES F/ 12080'-12579'MD. PUMPED 40 BBLS HIGH-VIS SWEEP DURING WIPER TRIP. 05:00 - 06:40 1.67 CASING N DPRB 12,379.00 ' RUNPRD POOH F/12579'-10700'MD LAYING IN LINER PILL WITH BEADS. 'WASH F/10700'-11100'MD CLEANING UP SHALE INTERVAL. 06:40 - 07:20 0.67 CASING N DPRB 12,379.00 RUNPRD CONTINUE POOH PAST BILLET. 10K OVERPULL JUST ABOVE BILLET. ABLE TO RUN DOWN AND WASH BACK UP THROUGH TIGHT SPOT. CONTINUE POOH. PASS THROUGH WINDOW WITH MIN PUMP RATE,SEE 10K OVERPULL JUST ABOVE WINDOW. GO BACK TO FULL RATE AND WASH DOWN TO JUST ABOVE WINDOW. 07:20 - 08:40 1.33 CASING N DPRB 12,379.00 RUNPRD CONTINUE POOH. FLAG PIPE AT 9100 FT EOP(WHITE),AND 6100 FT EOP(RED). 08:40 - 09:30 0.83 CASING N DPRB 12,379.00 RUNPRD PJSM WHILE PULL OUT AT 2000 FT FOR UD BHA. TRIP SHEET IS-14 BBLS TO THIS POINT. PERFORM JOG AT SURFACE THEN TAG STRIPPER,FLOW CHECK WELL. FLOW CHECK IS GOOD. 09:30 - 10:20 0.83 CASING N DPRB 12,379.00 RUNPRD UD BHA#14. FILL WELL WITH 1.5 BBLS. 110:20 - 11:00 0.67 CASING N DPRB 12,379.00 RUNPRD REMOVE BHI CABLE HEAD AND CT CONNECTOR. MOVE INJECTOR TO CIRC HOLE AND PUMP SLACK OUT OF REEL. PUMP 233 OF SLACK OUT,LEAVES 17 FT OF SLACK IN REEL ACCORDING TO SLB RECORDS. 11:00 - 11:50 0.83 CASING N DPRB 12,379.00 RUNPRD INSTALLBTTCONNECTOR. PULL TEST TO 35K,PRESSURE TEST TO 250/3500 PSI, GOOD. 11:50 - 12:30 0.67 CASING N DPRB 12,379.00 RUNPRD LINE UP REEL TO LAUNCH 3/4"BALL. LAUNCH 3/4"BALL AND CIRC IT AROUND. RECOVER IT ON THE OTHER END. 12:30 - 12:45 0.25 CASING N DPRB 12,379.00 RUNPRD PJSM FOR MAKING UP LINER. 12:45 - 13:20 0.58 CASING N DPRB 12,379.00 RUNPRD PREP RIG FLOOR FOR M/U LINER. SET INJECTOR ON LEGS. MAKE UP DRIFT WITH 1 STAND 1.25 CSH. • 13:20 - 18:00 4.67 CASING N DPRB 12,379.00 RUNPRD MAKE UP 2-7/8 x 3.25 x 3-1/2 LINER. F/0'-2850'MD.FILL LINER EVERY 20 JTS. 18:00 - 18:30 0.50 CASING N DPRB 12,379.00 RUNPRD CREW CHANGE,INSPECT TOOLS& EQUIPMENT. PJSM WITH RIG CREW FOR RUNNING LINER. Printed 4/1/2013 2:27:51PM North America-ALASKA-BP Page 4 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 End Date:3/7/2013 X3-01300:(1,321,359.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 21:00 2.50 CASING N DPRB 12,379.00 RUNPRD MU 3-1/4"X 3-1/2"LINER AND RUN IN HOLE. MU BHA,RIH F/2850'-3168'MD. GET ON WELL WITH INJECTOR,TEST QTS- GOOD. 21:00 - 00:00 3.00 CASING N DPRB 12,379.00 RUNPRD RIH WITH PROD LINER F/3168'-10,700'MD. 3/3/2013 00:00 - 04:30 4.50 CASING P RUNPRD RIH F/10,700'MD-11,300'MD.DRAG INCREASING,PUMPED 30 BBLS MINERAL OIL. CONTINUE TO WORK LEDGE AREAS DOWN F/ 11,300'-12,568'.CIRCULATE 30 MINS, PU 10'TO CONFIRM BOTTOM,LOST 7'OF HOLE.NO MORE ATTEMPTS MADE TO CONFIRM BOTTOM. 04:30 - 06:20 1.83 CASING P RUNPRD PREPARE TO RELEASE FROM LINER PER PROCEDURES. DROP 5/8"BALL,PUMP DOWN,PRESSURE UP TO 3300 PSI. PU 6'CONFIRMED RELEASE FROM SELRT. PU WEIGHT DROPPED F/45K-35K. CIRCULATE&PREPARE TO DISPLACE WELL TO KCL. 06:20 - 09:30 3.17 CEMT P RUNPRD START SWAP WELL TO KCL. HAVE TO COMPLETE FLUID SWAP BEFORE SPOTTING SLB CEMENT UNITS DUE TO VERY LIMITED SPACE ON DRILLER'S SIDE. 09:30 - 10:00 0.50 CEMT P RUNPRD AFTER KCL ALL THE WAY AROUND,PUMP PRESSURE AT 1.5 BPM IS 760 PSI. LOSING 3-4 BBUHR WITH KCL ALL THE WAY AROUND. PVT=346 BBLS. FILL PITS WITH REMAINING KCL WATER. 10:00 - 12:30 2.50 CEMT P RUNPRD EMPTY REMAINING VAC TRUCK AND SPOT CONTAM TRUCK IN AHEAD OF SLB CEMENT UNITS. SPOT SLB CEMENT UNITS AND RIG UP. 12:30 - 13:20 0.83 CEMT P RUNPRD READY TO PT CEMENT LINES WITH WATER. BLOWAIR DOWN TO VERIFY LINES ARE CLEAR. LINES ARE CLEAR,SEND 10 BBLS KCL WATER TO CEMENT VAN FOR PRIME UP AND PT. WHEN PUMP IS SHUT DOWN,WEIGHT GOES FROM-10K TO 21K. RIH ANOTHER 8 FT DOWN TO 12569 FT TO GET-10K WT AGAIN. AFTER CEMENTERS HAVE 10 BBLS,PUMP FROM RIG DOWN CT TO WARM THE LINES. SHUT IN RIG,PUMP FROM CEMENT VAN DOWN CT. PRESSURE TEST CEMENT LINE UP TO BLOCK VALVE ON FLOOR OF REEL HOUSE. PT TO 300/6000 PSI,GOOD. USE RIG AIR TO BLOW BACK LINES TO CEMENT VAN. 13:20 - 13:40 0.33 CEMT P RUNPRD PJSM WITH ALL CREWS FOR BATCHING UP AND PUMPING CEMENT. 13:40 - 14:20 0.67 CEMT P RUNPRD START BATCH UP CEMENT. Printed 4/1/2013 2:27:51PM North America-ALASKA-BP Page 5 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 End Date:3/7/2013 X3-01300:(1,321,359.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:20 - 14:45 0.42 CEMT P RUNPRD CEMENT IS UP TO WEIGHT. SHUT DOWN RIG PUMP. USE SLB PUMP TO PUT 31.6 BBLS 15.8# CLASS G CEMENT INTO REEL. AFTER PUTTING CEMENT IN REEL,SHUT DOWN AND CLEAN UP LINE GOING BACK TO SLB CEMENT UNIT. 14:45 - 15:10 0.42 CEMT P RUNPRD USE RIG PUMP TO DISPLACE CEMENT WITH 100 BBLS POWER PRO. SLOW DOWN DOSPLACEMENT WHEN LEADING EDGE OF CEMENT IS AT SELRT. 15:10 - 15:50 0.67 CEMT P RUNPRD ZERO OUT MM WHEN CMENET IS AT SHOE. STOP PUMPING WITH 2 BBLS CEMENT LEFT ABOVE SELRT. PICK UP CT WEIGHT+13 FT. STACK 10K BACK DOWN,NOW 10 FT HIGHER. PUMP SLOWLY AND PUSH PEE WEE DART INTO LWP. PICK UP 1 FT AND SIDE EXHAUST 5 BBLS. STACK 10K BACK DOWN,LAUNCH LWP WITH 3700 PSI. BUMP PLUG AT 20.5 BBLS(CALCULATED 20.3 BBLS). HOLD 1000 PSI OVER CIRC PRESSURE,THEN OPEN BAKER CHOKE AND CHECK FLOATS,FLOATS HOLDING. PRESSURE UP TO 700 PSI,UNSTING FROM DEPLOYMENT SLEEVE. CIRC 5 BBLS HERE AT LOW RATE. 15:50 - 18:00 2.17 CEMT P RUNPRD POOH,PUMP CT VOIDAGE+0.5 BPM. ALL PARAMETERS OF CEMENT JOB WERE NORMAL. PUMPED 31.6 BBLS CEMENT,GOT 27.3 BBLS BEHIND PIPE. 18:00 - 19:00 1.00 CEMT P RUNPRD CHANGE OUT WITH CREW,CONDUCT WALK AROUND INSPECT EQUIPMENT FLOW CHECK WELL-STATIC. 19:00 - 20:30 1.50 CEMT P RUNPRD PJSM WITH CREW FOR LD BHA,LD PH6, SELRT AND ATTEMPT TO REMOVE 5/8"BALL. 5/8"BALL COULD NOT BE RECOVERED, VISUALLY VERIFIED THAT 5/8"BALL WAS STUCK INSIDE OF TOOL. 20:30 - 22:00 1.50 EVAL P RUNPRD INSTALL SLIM CONNECTOR. PULL/PRESSURE TEST CONNECTOR GOOD. 22:00 - 23:00 1.00 EVAL P RUNPRD PJSM W/SLB MEMORY LOGGERS AND CREW. MU SLB MEMORY LOGGING TOOLS. 23:00 - 00:00 1.00 EVAL P RUNPRD MAKE UP BHA#16 RIH F/75'-450'MD. 3/4/2013 00:00 - 01:30 1.50 EVAL P OTHCMP RIH WITH BHA#16 F/450'-2376'MD. GET ON WELL,TEST QTS-GOOD. • • 01:30 - 03:00 1.50 EVAL P OTHCMP RIH WITH CLEAN OUT/LOGGING BHA F/2376'-8500'MD. 03:00 - 07:30 4.50 EVAL P OTHCMP CEMENT COMPRESSIVE STRENGTH 950 PSI. BEGIN LOGGING F/8500'-12,552'PBTD (UNCORRECTED). MM IN/OUT-1.31/1.48 CIRC PSI-2050 MW IN/OUT-8.84/8.61 PVT-452 07:30 - 08:30 1.00 EVAL P OTHCMP TAG STRIPPER AND FLOW CHECK WELL, GOOD. REMOVE INJECTOR AND L/D 2 JTS 2.06 CSH. Printed 4/1/2013 2:27:51PM North America-ALASKA-BP Page 6 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 End Date:3/7/2013 X3-01300:(1,321,359.00) Project:Prudhoe Bay I Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 09:30 1.00 EVAL P OTHCMP PUMP 3/8 BALL DOWN TO OPEN CIRC SUB. START STANDING BACK 1.25 CSH STANDS. 09:30 - 10:30 1.00 EVAL P OTHCMP CONTINUE PULLING CSH STANDS OUT. 10:30 - 11:00 0.50 EVAL P OTHCMP PULL UP TO MARKER JOINT AND HOLD PJSM 'WITH MEM LOGGER FOR HANDLING SOURCE. PULL UP TO SOURCE AND REMOVE FROM CARRIER. 11:00 - 11:30 0.50 EVAL P OTHCMP INSPECT CIRC SUB WITH 3/8 BALL SEAT, BALL IS NOT RECOVERED. ;CIRC PORTS ON THE SIDE OF THE TOOL THAT OPENED UP WHEN THE CIRC SUB WAS OPENED ARE LARGE ENOUGH TO LET A 3/8 BALL OUT. BALL IS LIKELY IN THE WELL. - 11:30 - 12:00 0.50 EVAL P OTHCMP OFFLOAD MCNL TOOLS FROM THE RIG AND DOWNLOAD DATA. 12:00 - 13:20 1.33 EVAL P OTHCMP JET STACK WITH SWIZZLE STICK. 13:20 - 14:20 1.00 EVAL P OTHCMP PRESSURE TEST TREE CAP,PREP FOR LINER LAP TEST. LOW PRESSURE TEST PASSES. FAIL HIGH PRESSURE TEST,INJECTING AT 0.3 BPM, 1200 PSI. 14:20 - 14:50 0.50 EVAL P OTHCMP PJSM THEN LOAD SOURCE ONTO RIG FLOOR. 14:50 - 17:00 2.17 EVAL C OTHCMP PJSM THEN M/U BHA#17-SECOND LOGGING BHA. 17:00 - 18:00 1.00 EVAL C OTHCMP HOLD KICK WHILE TRIPPING DRILL. M/U SAFETY JOINT,RIH AND CLOSE SAFETY VALVE. HOLD AAR TO DISCUSS DRILL. 18:00 - 19:30 1.50 EVAL C OTHCMP COMPLETE M/U SECOND LOGGING BHA TO 2365'. GET ON WELL. TEST QTS-GOOD. 119:30 - 20:50 1.33 EVAL C OTHCMP RIH W/BHA#17 F/2,365'TO 8,860'. PUMP RATE:0.5 BPM SPP:200 PSI MW IN/OUT:8.48/8.57 PPG 20:50 - 21:00 0.17 EVAL C OTHCMP CTS OPERATOR OBSERVED 5BBL GAIN OVER CALCULATED DISPLACEMENT. STOP AND FLOWCHECK WELL. WELL STATIC. NO FLOW OBSERVED. IT WAS DISCOVERED THAT THE RIG CREW WAS ADDING CHEMICAL AND MOVED SOME MUD. 21:00 - 21:45 0.75 EVAL C OTHCMP CONTINUE TO RIH F/8,860'TO 11,800'. PUMP RATE:0.5 BPM SPP:290 PSI MW IN/OUT:8.48/8.57 PPG 21:45 - 22:45 1.00 EVAL C OTHCMP LOG DOWN F/11,800'TO TD AT 12,552',AT 17 FPM AS PER SLB LOGGING REP. PUMP RATE:1.5 BPM SPP:2000 PSI MW IN/OUT:8.51/8.57 PPG 22:45 - 23:10 0.42 EVAL C OTHCMP LOG UP F/12,552'TO 12,100'AT 17 FPM. PUMP RATE:0.3 BPM SPP:330 PSI MW IN/OUT:8.42/8.51 PPG -LAY IN PERF PILL WHILE LOGGING UP. 23:10 - 23:15 0.08 EVAL C OTHCMP STOP AT 12,100'AND PAINT FLAG ON CT FOR DEPTH CORRECTION. Printed 4/1/2013 2:27:51PM North America-ALASKA-BP Page 7 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 End Date:3/7/2013 X3-01300:(1,321,359.00) Project:Prudhoe Bay Site:PB DS 06 • Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 23:15 - 23:30 0.25 EVAL C OTHCMP CONTINUE LOGGING UP F/12,100'TO 11,800'. PUMP RATE:0.3 BPM SPP:330 PSI MW IN/OUT:8.42/8.51 PPG 23:30 - 00:00 0.50 EVAL C OTHCMP POOH W/BHA#17 F/11,800'TO 10,465'AT REPORT TIME. PUMP RATE:0.6 BPM SPP:380 PSI MW IN/OUT:8.42/8.51 PPG 3/5/2013 00:00 01:30 1.50 EVAL C OTHCMP I CONTINUE TO POOH WITH LOGGING BHA#17 FROM 10,465'TO 2,365'. PUMP RATE:0.6 BPM SPP:380 PSI MW IN/OUT:8,42/8.51 PPG •01:30 - 03:30 2.00 • EVAL C ' OTHCMP CONTINUE TO POOH WITH LOGGING BHA#17 I FROM 2,365'TO LOGGING CARRIER AT 23.93' RACK BACK STANDS OF 1 1/4"CHS. HOLD PJSM AND REMOVE SOURCE FROM LOGGING CARRIER. LAY DOWN LOGGING CARRIER. 03:30 - 05:00 1.50 EVAL _C OTHCMP DOWNLOAD AND EVALUATE LOGGING DATA !TO DETERMINE PERFORATION INTERVALS. -CUT 10'OF COIL AND REPLACE BTT CONNECTOR DUE TO DAMAGE FROM BALL THAT WAS LEFT IN HOLE ON PREVIOUS CLEANOUT/LOGGING RUN. 05:00 - 06:00 1.00 EVAL-- C OTHCMP FUNCTION TEST BOPE.CLEAN RIG FLOOR. STANDBY FOR ORDERS. KEEP WELL FULL,TAKING<1 BBLS/HR. 06:00 - 08:30 2.50 EVAL X HMAN 10,500.00 OTHCMP DISCUSS FISHING OPTIONS WITH CTD SUPERINTENDENT AND WITH ANCHORAGE ODE. DECIDE TO RUN A VENTURI BASKET TO TRY AND RETRIEVE THE 3/8"BALL. 08:30 - 10:30 2.00 EVAL X HMAN 10,500.00 OTHCMP FINALIZE FISHING BHA WITH BTT. 10:30 - 12:00 1.50 EVAL X HMAN 10,500.00 OTHCMP BTT REP ARRIVES,LOAD TOOLS ONTO RIG. START M/U FISHING BHA WITH VENTURI BASKET AND INDEXING TOOL. 12:00 - 14:00 2.00 EVAL X HMAN 10,500.00 OTHCMP MU 108 JOINTS OF CSH FROM DERRICK. 14:00 - 16:00 2.00 EVAL X HMAN 10,500.00 OTHCMP RIH WITH FISHING BHA. PUMPING 0.3 BPM AT 900 PSI. 16:00 - 19:00 3.00 EVAL X HMAN 10,500.00 OTHCMP I GET PICKUP WEIGHT AT 9300'OF 33.5K#. RUN IN LINER AT 20 FPM PUMPING 1.3 BPM AT 3100 PSI 19:00 - 21:30 2.50 EVAL X HMAN 10,500.00 OTHCMP BRING PUMPS UP TO 1.3 BPM WITH 3290 PSI. VENTURI UP FROM 12,500'MD TO 9,300'MD. 21:30 - 22:30 1.00 EVAL X HMAN 10,500.00 OTHCMP LINE UP AND PUMP ACROSS TOP.POOH TO BHA.SHUT DOWN AND FLOW CHECK- STATIC.MUD WEIGHT IN AND OUT 8.4 PPG. 22:30 - 00:00 1.50 EVAL X HMAN 10,500.00 OTHCMP BREAK AND SET BACK INJECTOR OVER BUNGHOLE.CIRCULATE THROUGH COIL DOWN BUNGHOLE.PULL CSH AND STAND BACK. 3/6/2013 00:00 - 01:00 1.00 EVAL X HMAN 10,500.00 OTHCMP !PRE JOB SAFETY MEETING.PULL AND STAND !BACK CSH PIPE.BREAK AND AND LAY DOWN !VENTURI,REVERSE CIRCULATING JUNK !BASKET.RECOVERED VARIOUS MUSH BUT DID NOT RECOVER 3/8"BALL.CLEAR FLOOR. Printed 4/1/2013 2:27:51PM North America-ALASKA-BP Page 8 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 End Date:3/7/2013 X3-01300:(1,321,359.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) •01:00 01:30 0.50 EVAL X DFAL 10,500.00 OTHCMP HOLD PRE JOB SAFETY MEETING FOR PICKING UP MEMORY LOGGING TOOLS AND SOURCE AND CSH PIPE. 01:30 - 03:00 1.50 EVAL X DFAL 10,500.00 OTHCMP PICK UP MEMORY LOGGING ASSEMBLY,BHA #19 AND RUN IN HOLE.MAKE UP 2 JOINTS PH6,108 JOINTS CSH AND LOGGING CARRIER TO 3,502'MD. 03:00 - 03:30 0.50 EVAL X DFAL 10,500.00 OTHCMP STAB AND MAKE UP INJECTOR. 03:30 - 04:00 0.50 EVAL X DFAL 10,500.00 OTHCMP TEST QUICK TEST SUB TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH- PASS. 04:00 - 06:00 2.00 EVAL X DFAL 10,500.00 OTHCMP RUN IN HOLE WITH MEMORY LOGGING ASSEMBLY FROM 3,500'MD.RUN AT 60 FOOT PER MINUTE,PUMPING AT 0.5 BPM WITH 300 PSI.DOWN WEIGHT 2.5K.MUD WEIGHT IN AND OUT 8.4 PPG.AT 10,400'MD RUNNING AT 80 FPM PUMPING AT 0.75 BPM WITH 650 PSI. DOWN WEIGHT 19K 06:00 - 06:45 0.75 EVAL X DFAL 10,500.00 OTHCMP LOG DOWN FROM 11,800'AT 1000 FPH TO PBTD OF 12,553'UNCORRECTED. 06:45 - 07:40 0.92 EVAL X DFAL 10,500.00 OTHCMP LOG UP AT 1000 FPH FROM PBTD TO 11,800'. PAINT FLAG AT 8600'EOP.LAY IN 27 BBL PERF PILL. 07:40 - 09:30 1.83 EVAL X DFAL 10,500.00 OTHCMP POH FROM 11,800'PUMPING 1.2 BPM AT 1070 PSI. 09:30 - 09:55 0.42 EVAL X DFAL 10,500.00 OTHCMP TAG UP AT SURFACE,PJSM AND FLOW CHECK WELL.NO FLOW. 09:55 - 12:15 2.33 EVAL X DFAL 10,500.00 OTHCMP STAND BACK INJECTOR,LAY DOWN 2 JOINTS OF 2-1/16"CSH.STAND BACK 1-1/4°CSH.FILL HOLE BEFORE MARKER PUP,3.5 BBLS TO FILL. 12:15 - 13:15 1.00 EVAL X DFAL 10,500.00 OTHCMP PJSM FOR HANDLING LOGGING TOOL. STAND BACK 6 STANDS OF CSH.CLEAR FLOOR AND CELLAR. LAY DOWN LOGGING TOOL.OFF LOAD FROM RIG FOR DATA COLLECTION. 13:15 - 15:45 2.50 EVAL P OTHCMP PJSM,SLIP AND CUT 50'DRILLING LINE. EVALUATE LOG DATAAND FINALIZE PERF INTERVAL. 15:45 - 17:30 1.75 PERFOB P OTHCMP LOAD PERF GUNS TO PIPE SHED. RIG UP FLOOR FOR PERFORATING. 17:30 - 19:00 1.50 PERFOB P OTHCMP PRE JOB SAFETY MEETING.PICKUP AND RUN IN HOLE WITH 16 BLANK GUN PUNCHERS,4 PARTIALLY LOADED GUNS AND 10 FULLY LOADED GUNS TO 648'. 19:00 20:30 1.50 PERFOB P OTHCMP PICK UP BHA INCLUDING FIRING HEAD,10 JOINTS 1-1/4"CSH,MARKER PUP,80 JOINTS 1-1/4"CSH AND 2 JOINTS PH6 TO 3,557'. 20:30 - 20:45 0.25 PERFOB P OTHCMP PICKUP AND STAB INJECTOR.TEST QUICK TEST SUB TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH-PASS. 20:45 - 23:30 2.75 PERFOB P OTHCMP RUN IN HOLE TO FLAG AT 12,155.2'MD AND CORRECT MINUS 17.64'TO 12,137.56'MD. VERIFY WITH MANUAL MARKER WITH A MINUS 16.05.RUN IN HOLE TO BOTTOM AT 12,530'.UP WEIGHT 38.5K,DOWN WEIGHT 19.5K PULL UP STRING WEIGHT AND RESET DEPTH TO 12,530.6'MD.PULL UP BELOW SET DEPTH. Printed 4/1/2013 2:27:51PM North America-ALASKA-BP Page 9 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 End Date:3/7/2013 X3-01300:(1,321,359.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI. Active datum:Kelly Bushing/Rotary Table @74.Oousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 23:45 0.25 PERFOB P OTHCMP SET PUMP PARAMETERS FOR LOWAND HIGH AND INITIATE PUMP SEQUENCE. PERFORM FIRE SEQUENCE PER TCP SPECIALISTS.BRING UP GUNS ON DEPTH FOR FIRE AT 12,463.3'MD. GUNS FIRED AT 23:42 HOURS. 23:45 - 00:00 0.25 PERFOB P OTHCMP STARTUP HOLE AT 23 FPM WITH 39K UP WEIGHT.PUMP AT 1.5 BPM WITH 1800 PSI. OUT MM 0.0.WELL TOOK 3 BBL INITIAL DRINK.START VOLUME 444 BBLS.BRING UP BACK PRESSURE TO 300 PSI.AT 00:00 HOURS DEPTH AT 12,040.PULLING AT 25 FPM WITH 37.5K UP WEIGHT.PUMP IN AT 1.6 BPM WITH 2500 PSI AND 300 BACK WELLHEAD PRESSURE.OUT MM AT 1.36.VOLUME AT 435 BBLS. 3/7/2013 00:00 - 02:00 2.00 PERFOB P OTHCMP PULL OUT OF HOLE WITH PERFORATING ASSEMBLY.AT 01:00 HOURS DEPTH 8,750'MD PULLING AT 95 FPM WITH 27K UP WEIGHT. PUMP AT 1.6 BPM WITH 2300 PSI AND 300 PSI BACK PRESSURE,OUT MM 1.0 BPM.VOLUME 411 BBLS.FLUID IN AND OUT 8.5 PPG.IA-17 PSI,OA-67 PSI.PULL UP TO BHAAT 3,557' MD. 02:00 - 03:00 1.00 PERFOB P OTHCMP SHUT DOWN AND FLOW CHECK WELL AT BHA -STATIC.SERVICE RIG AND PREP TO PULL CSH PIPE. 03:00 - 04:00 1.00 PERFOB P OTHCMP STAND BACK 1-1/4"CSH DRILL PIPE FROM 3,556'MD TO 700'MD AT PERFORATING GUNS. 04:00 - 06:30 2.50 PERFOB P OTHCMP PRE JOB SAFETY MEETING FOR LAYING DOWN GUNS.LAID DOWN GUNS WATCHING FOR TRAPPED PRESSURE AND SHARP SCALLOPS. • 06:30 - 07:30 1.00 WHSUR P POST OFF LOAD PERF GUNS FROM PIPE SHED. RIG UP LITTLE RED FOR FREEZE PROTECT. MU FP BHA WITH NOZZLE,BPV AND STINGER. 07:30 - 09:15 1.75 WHSUR P POST GET ON WELL. PRESSURE TEST QTS TO 250/3500 PSI. PRESSURE TEST FP LINE TO 250/3500 PSI. RIH WITH FP BHA TO 2500' LOU GRIMALDI WITH AOGCC WAIVED WITNESS OF INITIAL BOP TEST ON WELL 06-08B FOR 3/8/2013 BUT REQUESTED AND UPDATE TOMORROW ON 3/8/2013. 09:15 - 10:30 1.25 WHSUR P POST PUMP 40 BBLS OF 80 DEG DIESEL INTO COIL. LAY IN AT 1 FOR 1 WITH 2 BBLS AHEAD 10:30 - 11:30 1.00 WHSUR P POST RIG DOWN LITTLE RED SERVICES. GET OFF WELL,LAY DOWN FP BHA. BLOW BACK COIL WITH AIR. 11:30 - 11:50 0.33 WHSUR P POST FILL WELL WITH MEOH PJSM WITH GREASE CREWAND VALVE CREW. • 11:50 - 12:10 0.33 WHSUR P POST GREASE AND CYCLE TREE VALVES 12:10 - 13:00 0.83 WHSUR P POST CONFIRM WELL TAKING FLUID FILL WELL WITH McOH SET 5-1/8"ISA BPV WITH T-BAR Printed 4/1/2013 2:27:51PM North America-ALASKA-BP Page 10 of 10 Operation Summary Report Common Well Name:06-24 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/28/2013 ' End Date:3/7/2013 X3-01300:(1,321,359.00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.:NORDIC 2 Spud Date/Time:10/22/1982 12:00:00AM Rig Release:3/7/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @74.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 13:45 0.75 WHSUR P POST LEAK TIGHT TEST OF SWAB • 14:00 - 17:00 3.00 RIGD P POST OPEN UP BOPE RAM DOORS AND INSPECT CHANGE OUT BLADE SEAL AND TOP SEAL OF B/S RAMS CLEAN PITS 17:00 - 20:30 3.50 RIGD P POST PJSM.ND BOPE.RIG DOWN LUBRICATOR. INSTALL TREE CAP. 20:30 - 22:00 1.50 RIGD P POST PRE JOB SAFETY MEETING.TEST TREE CAP TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH-PASS.PREP TO RIG DOWN MOVE OFF. RIG RELEASE AT 22:00 HOURS. Printed 4/1/2013 2:27:51PM 06-24B, Well History (Post Rig Sidetrack) Date Summary 03/07/13 T/I/O= 0/0/0; Conduct PJSM; Well static, WSL approval to set BPV with Dry-rod; Set 5-1/8" FMC"ISA" BPV#538 through stack, RKB=28', tagged at 28'. 03/09/13 T/I/O= SSV/7/2. Temp= SI. WHPs(Check leaking LDS&glaciation). No well house, No flowline. Swab scafold and ladder removed. No visible sign of leaking LDS and no glaciation at this time. SV,WV=?. SSV, MV=C. IA, OA= OTG. 16:15. 03/10/13 T/I/O=Vac/0/0; Conduct PJSM; Start barriers list, barriers=MV&SSV, verified by independently performing LTT on both; Replace companion flange on FC with tapped flange and jewelry; Torque all tree flanges to API specs using truck and equipment#32-022; NO MOVEMENT on flange studs; Rig up lubricator with pulling tool to tree cap flange and test to 300 and 3500 psi for 5 min. LTT passed; Open barriers and pull 5-1/8" FMC"ISA" BPV#538 through tree for Nordic 2 Post-CTD torque and test, 1-2'ext used, tagged at 90": S/I barriers and R/U FMC TTP#526 to lubricator; Retest lubricator as earlier stated; Set TTP, S/I barriers and c/o setting tool for pulling tool; Install lubricator and shell test tree to 300 and 5000 psi for 5 min. LTT passed and charted; Pull TTP and S/I barriers; RDMO; Install tree cap with new o- ring. 03/19/13 T/I/O=Vac/20/0+. Temp= SI. T FL(Slickline call in). No AL. TFL @ 636'(10 bbls). SV,WV, SSV= C. MV=O. IA, OA= OTG. NOVP. 08:40. 03/20/13 DRIFTED TO DEPLOYMENT SLEEVE@ 9378' SLM(9398' MD)W/10' DUMMY WHIP, 3.50" LIB IMPRESSION OF TOP OF DEPLOYMENT SLEEVE&SANDY LIKE MATERIAL BRUSHED DEPLOYMENT 03/21/13 Pumped 69 bbls crude to assist SL in Plug set. MITT 3000 psi""*PASSED*** 15 min loss of 6 psi, 30 min loss of 2 psi, for total loss of 8 psi. See log for details. Bleed TBG pressure to 100 psi for SL. SL on well upon departure CV OTG FWHP=100/20/0. 03/21/13 SET BKR 45 KB LTP @ 9370'SLM/9384' MD. SET 4-1/2" LTTP @ 9367'SLM. LRS PREFORMED PASSING MIT-T TO 3000psi. PULLED STA.#3 RK-DGLV @ 6,087' SLM (6,104' MD). PULLED STA.#4 RK-DGLV @ 3,430' SLM (3,447' MD). SET STA.#4 RK-LGLV(16/64" ports, 1,500#tro.) @ 3,447'MD. SET STA.#3 RK-S/O 20/64) @ 6104'MD. PULLED LTTP @ 9364'SLM,ALL CLEAR RDMO. Page 1 of 1 FA id BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-24 -Slot 24 06-24BPB1 Survey: MWD Survey Report - Geographic 28 February, 2013 Qbp NMI BAKER HUOMS Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-24-Slot 24 Project: Prudhoe Bay TVD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors- Site: PB DS 06 MD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Well: 06-24 North Reference: True Wellbore: 06-24BPB1 Survey Calculation Method: Minimum Curvature Design: 06-24BPB1 Database: EDM R5K-Alaska PROD-ANCP 1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 06,TR-10-14 Site Position: Northing: 5,941,880.59 usft Latitude: 70'14'46.529 N !From: Map Easting: 684,674.88 usft Longitude: 148"30'29.22 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.40° Well 06-24 API No.500292082200 Well Position +N1S 0.00 usft Northing: 5,941,415.88 usft Latitude: 70"14'41.653 N +EI-W 0.00 usft Easting: 685,942.02 usft Longitude: 148"29'52.72 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 37.00 usft Wellbore 06-24BPB1 API no. 500292082270 Magnetics Model Name Sample Date Declination Dip Angle Field Strength Cl (°) (nT) BGGM2012 2/10/2013 20.64 81.01 57,630 Design 06-24BPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,405.80 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (1 34.00 0.00 0.00 342.02 Survey Program Date: 2/28/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 97.00 8,097.00 1 :Camera based gyro multisho(06-24) CB-GYRO-MS Camera based gyro multishot 8,141.00 9,405.80 MWD Final 6-24a(06-24A) MWD MWD-Standard 9,478.00 11,584.00 MWD(06-24BPB1) MWD MWD-Standard 2/28/2013 4:04:17PM Page 2 COMPASS 5000.1 Build 61 NMI BAKER FIUGHES Survey Report-Geographic 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-24-Slot 24 Project: Prudhoe Bay TVD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Site: PB DS 06 MD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Well: 06-24 North Reference: True Wellbore: 06-24BPB1 Survey Calculation Method: Minimum Curvature Design: 06-24BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,405.80 37.52 308.50 8,740.84 2,006.46 -1,977.23 5,943,372.83 683,916.02 70°15 1.384 N 148°30'50.23 W TIP 9,478.00 39.52 307.86 8,797.33 2,034.25 -2,012.58 5,943,399.73 683,880.00 70°15 1.657 N 148°30'51.25 W' 1 KOP 9,500.60 39.85 311.00 8,814.72 2,043.41 -2,023.72 5,943,408.62 683,868.63 70°15'1.747 N 148°30'51.58 W 9,530.47 43.80 319.50 8,836.99 2,057.57 -2,037.67 5,943,422.43 683,854.33 70°15 1.886 N 148°30'51.98 W 9,560.16 49.46 325.00 8,857.38 2,074.64 -2,050.83 5,943,439.17 683,840.76 70°15'2.054 N 148°30'52.37 W 9,590.28 54.62 331.00 8,875.91 2,094.78 -2,063.37 5,943,458.99 683,827.73 70°15'2.252 N 148°30'52.73 W 9,620.39 61.36 335.00 8,891.87 2,117.52 -2,074.92 5,943,481.45 683,815.62 70'15 2.476 N 148°30'53.07 W 9,650.51 68.51 338.00 8,904.62 2,142.53 -2,085.77 5,943,506.18 683,804.16 70°15 2.722 N 148°30'53.38 W I 9,680.62 73.49 343.98 8,914.43 2,169.43 -2,095.01 5,943,532.84 683,794.25 70°15 2.986 N 148°30'53.65 W 9,710.65 76.66 350.09 8,922.17 2,197.70 -2,101.51 5,943,560.93 683,787.06 70°15'3.264 N 148°30'53.84 W 9,740.45 80.37 355.58 8,928.11 2,226.66 -2,105.14 5,943,589.79 683,782.72 70°15'3.549 N 148°30'53.95 W 9,770.57 79.96 2.19 8,933.26 2,256.31 -2,105.72 5,943,619.42 683,781.41 70°15'3.841 N 148°30'53.96 W 9,800.47 77.73 9.34 8,939.05 2,285.47 -2,102.78 5,943,648.65 683,783.63 70°15'4.128 N 148°30'53.88 W 9,830.51 74.73 14.91 8,946.20 2,313.99 -2,096.66 5,943,677.30 683,789.04 70°15'4.408 N 148°30'53.70 W 9,861.09 73.01 21.15 8,954.71 2,341.91 -2,087.58 5,943,705.43 683,797.43 70°15'4.683 N 148°30'53.44 W 9,891.15 73.87 27.72 8,963.28 2,368.12 -2,075.67 5,943,731.93 683,808.69 70°15'4.940 N 148°30'53.09 W 9,920.43 72.02 32.74 8,971.88 2,392.30 -2,061.59 5,943,756.45 683,822.17 70°15'5.178 N 148°30'52.68 W 9,950.52 78.46 36.79 8,979.54 2,416.17 -2,045.00 5,943,780.72 683,838.17 70°15'5.413 N 148°30'52.20 W 9,980.55 80.78 42.35 8,984.95 2,438.93 -2,026.18 5,943,803.93 683,856.41 70°15'5.637 N 148°30'51.65 W 10,010.67 80.98 49.38 8,989.73 2,459.62 -2,004.85 5,943,825.15 683,877.22 70°15'5.841 N 148°30'51.03 W 10,040.56 82.25 56.36 8,994.10 2,477.46 -1,981.29 5,943,843.56 683,900.33 70°15'6.016 N 148°30'50.35 W 10,069.84 82.03 62.49 8,998.11 2,492.21 -1,956.33 5,943,858.92 683,924.92 70°15'6.161 N 148°30'49.62 W 10,101.09 85.60 70.10 9,001.48 2,504.68 -1,927.91 5,943,872.08 683,953.03 70°15'6.284 N 148°30'48.79 W, 10,130.21 82.88 72.84 9,004.40 2,513.89 -1,900.44 5,943,881.97 683,980.25 70°15'6.375 N 148°30'48.00 W' 10,161.07 82.79 75.38 9,008.25 2,522.27 -1,871.00 5,943,891.07 684,009.48 70°15'6.457 N 148°30'47.14 W 10,190.48 82.46 77.77 9,012.03 2,529.04 -1,842.63 5,943,898.54 684,037.67 70°15'6.524 N 148°30'46.31 W 10,220.25 81.90 81.20 9,016.08 2,534.42 -1,813.64 5,943,904.64 684,066.52 70°15'6.577 N 148°30'45.47 W 10,250.81 83.14 83.44 9,020.06 2,538.47 -1,783.61 5,943,909.42 684,096.44 70°15'6.617 N 148°30'44.60 W', 10,280.73 84.99 85.87 9,023.15 2,541.24 -1,753.98 5,943,912.92 684,125.99 70°15'6.644 N 148°30'43.74 WI 10,310.57 87.67 91.65 9,025.06 2,541.88 -1,724.23 5,943,914.30 684,155.72 70°15'6.650 N 148°30'42.87 W 10,340.78 90.43 97.44 9,025.56 2,539.49 -1,694.13 5,943,912.65 684,185.86 70°15'6.627 N 148°30'42.00 W', 10,370.67 89.26 101.71 9,025.64 2,534.52 -1,664.67 5,943,908.41 684,215.44 70°15'6.578 N 148°30'41.14 W 10,400.79 88.37 105.08 9,026.27 2,527.54 -1,635.38 5,943,902.16 684,244.89 70°15'6.509 N 148°30'40.29 W 10,430.75 87,54 109.10 9,027.34 2,518.75 -1,606.76 5,943,894.07 684,273.71 70°15'6.423 N 148°30'39.45 W 10,460.71 88.65 112.18 9,028.33 2,508.19 -1,578.75 5,943,884.21 684,301.98 70°15'6.319 N 148°30'38.64 W 10,490.60 90.15 115.86 9,028.65 2,496.03 -1,551.45 5,943,872.73 684,329.56 70°15'6.200 N 148°30'37.85 W 10,520.41 89.20 120.63 9,028.81 2,481.93 -1,525.20 5,943,859.28 684,356.15 70°15'6.061 N 148°30'37.08 W 10,550.58 89.48 125.05 9,029.16 2,465.57 -1,499.86 5,943,843.55 684,381.89 70°15'5.900 N 148°30'36.34 W 10,581.12 90.12 128.73 9,029.27 2,447.24 -1,475.44 5,943,825.83 684,406.75 70°15'5.720 N 148°30'35.63 W 10,610.59 89.36 133.31 9,029.40 2,427.91 -1,453.21 5,943,807.05 684,429.45 70°15'5.530 N 148°30'34.99 W 10,640.48 89.48 134.12 9,029.71 2,407.25 -1,431.61 5,943,786.94 684,451.55 70°15'5.327 N 148°30'34.36 W 10,670.64 91.57 136.62 9,029.43 2,385.79 -1,410.42 5,943,766.01 684,473.26 70°15'5.116 N 148°30'33.74 W 10,700.11 90.52 134.55 9,028.89 2,364.75 -1,389.80 5,943,745.48 684,494.39 70°15'4.909 N 148°30'33.14 W 10,730.57 93.81 133.54 9,027.74 2,343.59 -1,367.93 5,943,724.87 684,516.78 70°15'4.701 N 148°30'32.51 W 10,760.27 92.61 133.35 9,026.08 2,323.20 -1,346.40 5,943,705.01 684,538.80 70°15'4.500 N 148°30'31.88 W 10,790.15 89.42 131.85 9,025.55 2,302.98 -1,324.41 5,943,685.35 684,561.28 70°15'4.301 N 148°30'31.24 W 10,820.12 87.42 130.52 9,026.38 2,283.25 -1,301.87 5,943,666.18 684,584.30 70°15'4.107 N 148°30'30.59 W 10,851.79 88.83 129.65 9,027.41 2,262.87 -1,277.65 5,943,646.41 684,609.01 70°15'3.907 N 148°30'29.88 W 10,880.11 88.37 127.51 9,028.10 2,245.22 -1,255.52 5,943,629.30 684,631.57 70°15'3.733 N 148°30'29.24 W 10,910.43 93.44 128.76 9,027.62 2,226.50 -1,231.68 5,943,611.19 684,655.86 70°15'3.549 N 148°30'28.54 W 10,940.39 89.82 129.21 9,026.77 2,207.66 -1,208.41 5,943,592.93 684,679.59 70°15'3.364 N 148°30'27.87 W 10,970.55 88.01 126.68 9,027.34 2,189.12 -1,184.63 5,943,574.98 684,703.82 70°15'3.182 N 148°30'27.18 W 11,000.67 86.25 123.53 9,028.85 2,171.83 -1,160.02 5,943,558.30 684,728.84 70°15'3.012 N 148°30'26.46 W 2/28/2013 4:04:17PM Page 3 COMPASS 5000.1 Build 61 MitIII BAKER MRIMES Survey Report-Geographic 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-24-Slot 24 Project: Prudhoe Bay TVD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Site: PB DS 06 MD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Well: 06-24 North Reference: True Wellbore: 06-24BPB1 Survey Calculation Method: Minimum Curvature Design: 06-24BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,030.55 86.71 122.16 9,030.69 2,155.65 -1,134.97 5,943,542.75 684,754.29 70°15 2.853 N 148°30'25.73 W' 11,060.41 87.18 119.98 9,032.28 2,140.27 -1,109.43 5,943,528.00 684,780.20 70°15'2.701 N 148°30'24.99 W' 11,090.19 89.08 117.27 9,033.25 2,126.01 -1,083.31 5,943,514.39 684,806.66 70°15'2.561 N 148°30'24.23 W 11,120.73 88.86 114.65 9,033.80 2,112.64 -1,055.85 5,943,501.70 684,834.43 70°15 2.430 N 148°30'23.43 W 11,150.29 86.29 115.91 9,035.05 2,100.03 -1,029.15 5,943,489.76 684,861.44 70°15 2.306 N 148°30'22.65 W 11,180.16 82.65 117.90 9,037.93 2,086.58 -1,002.64 5,943,476.97 684,888.27 70°15 2.174 N 148°30'21.88 W 11,210.23 80.05 117.39 9,042.45 2,072.79 -976.31 5,943,463.83 684,914.93 70°15'2.038 N 148°30'21.12 W 11,241.03 84.23 116.20 9,046.66 2,059.04 -949.08 5,943,450.76 684,942.49 70°15'1.903 N 148 30'20.32 W 11,270.18 86.35 114.44 9,049.06 2,046.62 -922.83 5,943,438.99 684,969.04 70°15 1.781 N 148°30'19.56 W 11,299.99 87.67 113.75 9,050.61 2,034.47 -895.65 5,943,427.51 684,996.51 70°15'1.661 N 148°30'18.77 W 11,330.16 87.05 111.08 9,052.00 2,022.97 -867.79 5,943,416.71 685,024.64 70°15'1.548 N 148°30'17.96 W 11,360.18 88.65 108.79 9,053.13 2,012.75 -839.59 5,943,407.18 685,053.08 70°15 1.448 N 148°30'17.14 W 11,390.20 90.31 107.31 9,053.40 2,003.45 -811.05 5,943,398.59 685,081.84 70°15'1.356 N 148°30'16.31 W 11,415.39 92.18 106.35 9,052.85 1,996.16 -786.95 5,943,391.89 685,106.11 70°15'1.285 N 148°30'15.61 W 11,440.53 94.52 106.60 9,051.38 1,989.04 -762.89 5,943,385.37 685,130.35 70°15'1.215 N 148°30'14.91 W 11,470.19 94.27 109.10 9,049.11 1,979.97 -734.74 5,943,377.01 685,158.71 70°15'1.125 N 148°30'14.09 W 11,500.31 96.40 110.75 9,046.31 1,969.76 -706.55 5,943,367.49 685,187.14 70°15'1.025 N 148°30'13.27 W 11,530.20 99.62 111.60 9,042.14 1,959.07 -678.95 5,943,357.48 685,214.99 70°15'0.920 N 148'30'12.47 W 11,584.00 99.62 111.60 9,033.15 1,939.54 -629.63 5,943,339.18 685,264.77 70°15'0.728 N 148"30'11.03 W TD 2/28/2013 4:04:17PM Page 4 COMPASS 5000.1 Build 61 VI it 11 BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-24 - Slot 24 06-24B Survey: MWD Survey Report - Geographic 28 February, 2013 Qbp BAK'RR• OMS Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-24-Slot 24 Project: Prudhoe Bay TVD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Site: PB DS 06 MD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Well: 06-24 North Reference: True Wellbore: 06-24B Survey Calculation Method: Minimum Curvature Design: 06-24B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor I Site PB DS 06,TR-10-14 Site Position: Northing: 5,941,880.59 usft Latitude: 70°14'46.529 N From: Map Easting: 684,674.88 usft Longitude: 148°30'29.22 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.40° Well 06-24 API No.500292082200 Well Position +N/-S 0.00 usft Northing: 5,941,415.88 usft Latitude: 70°14'41.653 N +E/-W 0.00 usft Easting: 685,942.02 usft Longitude: 148°29'52.72 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 37.00 usft I Wellbore 06-24B API no. 500292082202 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1 O (nT) BGGM2012 2/10/2013 20.64 81.01 57,630 Design 06-24B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,040.56 Vertical Section: Depth From(TVD) +NI-S +E/-W Direction (usft) (usft) (usft) (°) 34.00 0.00 0.00 356.27 Survey Program Date: 2/28/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 97.00 8,097.00 1:Camera based gyro multisho(06-24) CB-GYRO-MS Camera based gyro multishot 8,141.00 9,405.80 MWD Final 6-24a(06-24A) MWD MWD-Standard 9,478.00 10,040.56 MWD(06-24BPB1) MWD MWD-Standard 10,053.30 12,578.00 MWD(06-248) MWD MWD-Standard 2/28/2013 3:54:47PM Page 2 COMPASS 5000.1 Build 61 Milli BAIQR HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-24-Slot 24 Project: Prudhoe Bay TVD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Site: PB DS 06 MD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Well: 06-24 North Reference: True Wellbore: 06-24B Survey Calculation Method: Minimum Curvature Design: 06-24B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,040.56 82.25 56.36 8,994.10 2,477.46 -1,981.29 5,943,843.56 683,900.33 70°15'6.016 N 148°30'50.35 W 10,053.30 82.14 59.03 8,995.83 2,484.20 -1,970.62 5,943,850.56 683,910.83 70°15'6.082 N 148°30'50.04 W KOP 10,069.87 87.60 59.50 8,997.31 2,492.64 -1,956.44 5,943,859.34 683,924.80 70°15'6.165 N 148°30'49.62 W 10,099.95 87.67 55.22 8,998.55 2,508.84 -1,931.14 5,943,876.17 683,949.69 70°15'6.325 N 148°30'48.89 W 10,129.69 84.37 61.90 9,000.62 2,524.31 -1,905.85 5,943,892.25 683,974.59 70°15'6.477 N 148°30'48.15 W 10,165.32 82.98 70.70 9,004.55 2,538.53 -1,873.46 5,943,907.27 684,006.62 70°15'6.617 N 148°30'47.21 W 10,185.70 81.16 75.44 9,007.36 2,544.41 -1,854.16 5,943,913.62 684,025.77 70°15'6.675 N 148°30'46.65 W 10,216.40 81.99 83.44 9,011.87 2,549.97 -1,824.33 5,943,919.91 684,055.45 70°15'6.730 N 148°30'45.78 W 10,240.37 85.27 89.22 9,014.53 2,551.49 -1,800.57 5,943,922.02 684,079.17 70°15'6.745 N 148°30'45.09 W 10,270.52 85.15 95.46 9,017.05 2,550.26 -1,770.56 5,943,921.53 684,109.19 70°15'6.733 N 148°30'44.22 W 10,300.44 85.09 101.45 9,019.60 2,545.88 -1,741.09 5,943,917.88 684,138.76 70°15'6.690 N 148°30'43.36 W 10,330.36 86.10 98.81 9,021.90 2,540.64 -1,711.72 5,943,913.36 684,168.25 70°15'6.638 N 148°30'42.51 W 10,360.33 88.53 97.08 9,023.30 2,536.50 -1,682.08 5,943,909.96 684,197.98 70°15'6.597 N 148°30'41.64 W 10,380.47 88.87 95.61 9,023.76 2,534.27 -1,662.07 5,943,908.23 684,218.04 70°15 6.576 N 148°30'41.06 W 10,400.48 87.94 93.55 9,024.31 2,532.68 -1,642.13 5,943,907.12 684,238.01 70°15'6.560 N 148°30'40.48 W I 10,430.43 87.14 98.33 9,025.60 2,529.58 -1,612.38 5,943,904.76 684,267.83 70°15 6.530 N 148°30'39.62 W 10,460.63 87.45 105.51 9,027.03 2,523.35 -1,582.88 5,943,899.27 684,297.47 70°15 6.468 N 148°30'38.76 W 10,490.73 87.33 111.36 9,028.40 2,513.85 -1,554.37 5,943,890.47 684,326.21 70°15 6.375 N 148°30'37.93 W 10,520.72 88.92 118.58 9,029.38 2,501.20 -1,527.21 5,943,878.50 684,353.66 70°15'6.251 N 148°30'37.14 W 10,550.44 90.92 125.62 9,029.42 2,485.42 -1,502.05 5,943,863.34 684,379.20 70°15'6.095 N 148°30'36.41 W 10,577.98 90.18 132.04 9,029.16 2,468.16 -1,480.61 5,943,846.62 684,401.06 70°15'5.926 N 148°30'35.78 W 10,600.17 89.94 136.38 9,029.13 2,452.70 -1,464.71 5,943,831.55 684,417.34 70°15 5.774 N 148°30'35.32 W 10,630.11 89.23 133.04 9,029.35 2,431.64 -1,443.44 5,943,811.02 684,439.12 70°15'5.567 N 148°30'34.70 W 10,663.19 91.08 127.69 9,029.26 2,410.22 -1,418.24 5,943,790.23 684,464.84 70°15 5.356 N 148°30'33.97 W 10,690.25 89.91 124.50 9,029.03 2,394.28 -1,396.38 5,943,774.84 684,487.08 70°15'5.199 N 148°30'33.33 W 10,720.27 87.94 122.39 9,029.59 2,377.74 -1,371.34 5,943,758.92 684,512.52 70°15'5.037 N 148°30'32.61 W 10,751.05 88.99 127.99 9,030.42 2,360.02 -1,346.20 5,943,741.82 684,538.09 70°15'4.862 N 148°30'31.88 W 10,780.09 89.14 133.18 9,030.89 2,341.13 -1,324.16 5,943,723.49 684,560.59 70°15'4.677 N 148°30'31.23 W 10,811.17 86.93 138.08 9,031.96 2,318.94 -1,302.45 5,943,701.84 684,582.84 70°15'4.458 N 148°30'30.60 W 10,840.13 88.28 138.27 9,033.17 2,297.38 -1,283.15 5,943,680.76 684,602.66 70°15 4.246 N 148°30'30.04 W 10,873.70 89.69 133.84 9,033.76 2,273.22 -1,259.87 5,943,657.19 684,626.54 70°15'4.009 N 148°30'29.36 W 10,900.19 92.30 133.72 9,033.30 2,254.89 -1,240.74 5,943,639.34 684,646.10 70°15 3.829 N 148°30'28.81 W 10,933.33 91.16 130.91 9,032.30 2,232.59 -1,216.25 5,943,617.66 684,671.14 70°15'3.609 N 148°30'28.10 W 10,960.47 88.74 128.05 9,032.33 2,215.34 -1,195.31 5,943,600.93 684,692.50 70°15'3.440 N 148°30'27.49 W 10,990.74 89.39 127.62 9,032.82 2,196.78 -1,171.40 5,943,582.96 684,716.85 70°15'3.257 N 148°30'26.79 W 11,020.65 88.50 124.89 9,033.37 2,179.09 -1,147.29 5,943,565.88 684,741.39 70°15 3.083 N 148°30'26.09 W 11,053.32 87.33 120.76 9,034.56 2,161.40 -1,119.86 5,943,548.86 684,769.25 70°15'2.909 N 148°30'25.29 W 11,080.37 87.42 116.25 9,035.80 2,148.51 -1,096.12 5,943,536.56 684,793.29 70°15'2.783 N 148°30'24.60 W 11,110.29 87.67 112.00 9,037.08 2,136.29 -1,068.85 5,943,525.02 684,820.86 70°15'2.662 N 148°30'23.81 W 11,140.42 90.46 107.84 9,037.57 2,126.03 -1,040.53 5,943,515.47 684,849.42 70°15'2.562 N 148/30'22.98 W 11,172.61 90.43 104.44 9,037.32 2,117.08 -1,009.62 5,943,507.29 684,880.54 70°15'2.474 N 148/30'22.08 W 11,200.19 88.56 99.27 9,037.57 2,111.42 -982.64 5,943,502.29 684,907.65 78/15'2.418 N 148"30'21.30 W 11,230.67 89.63 103.35 9,038.05 2,105.45 -952.76 5,943,497.05 684,937.67 70°15'2.359 N 148°30'20.43 W 11,261.87 90.89 109.40 9,037.91 2,096.65 -922.84 5,943,489.00 684,967.79 70°15'2.273 N 148°30'19.56 W 11,290.49 91.50 114.91 9,037.31 2,085.87 -896.35 5,943,478.87 684,994.54 70°15'2.167 N 148°30'18.79 W', 11,320.11 91.60 121.05 9,036.51 2,071.98 -870.21 5,943,465.64 685,021.01 70°15'2.030 N 148°30'18.03 W 11,350.21 91.66 126.68 9,035.65 2,055.22 -845.24 5,943,449.50 685,046.39 70°15'1.865 N 148°30'17.30 W 11,380.65 90.89 124.87 9,034.97 2,037.43 -820.55 5,943,432.33 685,071.51 70°15 1.691 N 148°30'16.59 W 11,409.81 90.80 119.68 9,034.54 2,021.87 -795.91 5,943,417.38 685,096.52 70°15'1.537 N 148°30'15.87 W 11,442.24 85.73 113.78 9,035.52 2,007.30 -766.98 5,943,403.53 685,125.80 70°15'1.394 N 148°30'15.03 W 11,469.89 84.99 108.99 9,037.76 1,997.25 -741.33 5,943,394.12 685,151.69 70°15 1.295 N 148°30'14.28 W 11,489.90 86.19 107.84 9,039.30 1,990.95 -722.40 5,943,388.28 685,170.77 70'15'1.233 N 148°30'13.73 W 11,509.81 88.96 106.85 9,040.14 1,985.02 -703.41 5,943,382.82 685,189.90 70°15'1.175 N 148°30'13.18 W 11,540.07 93.01 109.25 9,039.62 1,975.65 -674.65 5,943,374.17 685,218.88 70°15'1.083 N 148/30'12.34 W 2/28/2013 3.54:47PM Page 3 COMPASS 5000.1 Build 61 HIM BAKES HUGHES Survey Report-Geographic 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-24-Slot 24 Project: Prudhoe Bay TVD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Site: PB DS 06 MD Reference: newrig:Nabors 7ES 71.0 @ 71.00usft(newrig:Nabors' Well: 06-24 North Reference: True Wellbore: 06-24B Survey Calculation Method: Minimum Curvature Design: 06-24B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,569.50 94.97 114.18 9,037.57 1,964.79 -647.39 5,943,363.98 685,246.40 70°15 0.976 N 148°30'11.55 W 11,609.46 93.56 120.10 9,034.60 1,946.62 -611.94 5,943,346.69 685,282.28 70°15'0.798 N 148°30'10.52 W 11,629.72 91.66 123.03 9,033.68 1,936.03 -594.70 5,943,336.53 685,299.78 70°15 0.693 N 148°30'10.02 W 11,659.73 90.92 126.83 9,033.00 1,918.85 -570.11 5,943,319.97 685,324.78 70°15'0.524 N 148°30'9.30 W 11,690.20 88.65 130.51 9,033.12 1,899.82 -546.32 5,943,301.53 685,349.03 70°15'0.337 N 148°30'8.61 W 11,719.90 89.91 134.32 9,033.49 1,879.79 -524.40 5,943,282.05 685,371.43 70°15'0.140 N 148°30'7.97 W 11,749.68 90.31 138.89 9,033.43 1,858.16 -503.95 5,943,260.93 685,392.41 70°14'59.928 N 148°30'7.38 W 11,779.65 88.53 142.99 9,033.74 1,834.89 -485.07 5,943,238.14 685,411.86 70°14'59.699 N 148°30'6.83 W 11,809.68 89.17 145.30 9,034.34 1,810.56 -467.49 5,943,214.25 685,430.04 70°14'59.460 N 148°30'6.32 W 11,840.13 87.42 148.34 9,035.24 1,785.09 -450.83 5,943,189.20 685,447.32 70°14'59.209 N 148°30'5.83 W 11,870.18 90.31 148.02 9,035.84 1,759.57 -434.99 5,943,164.07 685,463.78 70°14'58.958 N 148°30'5.37 W 11,900.20 90.37 144.30 9,035.66 1,734.64 -418.28 5,943,139.56 685,481.10 70°14'58.713 N 148°30'4.89 W 11,930.30 90.92 141.03 9,035.32 1,710.71 -400.03 5,943,116.10 685,499.94 70°14'58.477 N 148°30'4.36 W 11,968.97 90.15 136.08 9,034.96 1,681.73 -374.44 5,943,087.76 685,526.23 70°14'58.193 N 148°30'3.61 W 12,000.29 89.91 133.60 9,034.94 1,659.65 -352.23 5,943,066.23 685,548.97 70°14'57.975 N 148°30'2.97 W 12,035.51 90.89 129.35 9,034.70 1,636.33 -325.85 5,943,043.57 685,575.92 70°14'57.746 N 148°30'2.20 W 12,060.43 88.83 130.53 9,034.76 1,620.33 -306.75 5,943,028.05 685,595.41 70°14'57.589 N 148°30'1.64 W 12,090.49 87.23 134.63 9,035.79 1,600.01 -284.63 5,943,008.29 685,618.02 70°14'57.389 N 148°30'1.00 W 12,120.36 88.99 138.40 9,036.78 1,578.35 -264.09 5,942,987.14 685,639.09 70°14'57.176 N 148°30'0.40 W 12,150.99 91.04 143.57 9,036.77 1,554.56 -244.82 5,942,963.84 685,658.94 70°14'56.942 N 148°29'59.84 W 12,175.63 93.01 148.39 9,035.90 1,534.16 -231.04 5,942,943.78 685,673.21 70°14'56.741 N 148°29'59.44 W 12,200.27 92.80 150.28 9,034.65 1,513.00 -218.49 5,942,922.93 685,686.28 70°14'56.533 N 148°29'59.08 W 12,230.53 91.93 152.63 9,033.40 1,486.44 -204.05 5,942,896.74 685,701.38 70°14'56.272 N 148°29'58.66 W 12,261.66 94.30 153.40 9,031.71 1,458.74 -189.94 5,942,869.40 685,716.16 70°14'55.999 N 1481 29'58.25 W 12,293.77 97.63 155.88 9,028.37 1,429.89 -176.27 5,942,840.90 685,730.54 70°14'55.716 N 148°29'57.85 W 12,321.50 100.57 155.21 9,023.99 1,404.97 -164.93 5,942,816.27 685,742.49 70°14'55.471 N 148°29'57.52 W 12,349.68 104.54 154.74 9,017.86 1,380.05 -153.30 5,942,791.64 685,754.73 70°14'55.226 N 148°29'57.18 W 12,382.62 108.97 154.74 9,008.37 1,351.53 -139.85 5,942,763.47 685,768.88 70°14'54.945 N 148°29'56.79 W 12,412.22 112.44 154.38 8,997.91 1,326.53 -127.95 5,942,738.77 685,781.39 70°14'54.699 N 148°29'56.44 W 12,440.77 115.61 155.61 8,986.28 1,302.90 -116.93 5,942,715.42 685,792.99 70°14'54.467 N 148°29'56.12 W 12,472.94 117.33 157.90 8,971.94 1,276.45 -105.56 5,942,689.26 685,805.01 70°14'54.207 N 148°29'55.79 W 12,503.00 118.09 161.37 8,957.96 1,251.51 -96.30 5,942,664.55 685,814.88 70°14'53.961 N 148°29'55.52 W 12,519.84 117.84 163.83 8,950.06 1,237.31 -91.85 5,942,650.48 685,819.68 70°14'53.822 N 1481 29'55.39 W 12,578.00 117.84 163.83 8,922.90 1,187.92 -77.53 5,942,601.45 685,835.21 70°14'53.336 N 1481 29'54.98 W TD-2 7/8" 2/28/2013 3:54:47PM Page 4 COMPASS 5000.1 Build 61 Letter of Transmittal , LA- I BAKER Date: March 4, 2013 HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): 14-02CL1 L5 01-17C o2- I a l c g� 05-35AL2PB1, 05-35B aZ 1 3 " 0 18- 07-29E 1 3 — ) ! P-17L1 (c 06-02B � 06-22BPB1, 06-22'B .06-24BPB 1, 06-24B (9 i Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: / to of Alaska AOGCC DATE: hc' O6-748 P Z1ZI Oo Regg, James B (DOA) From: Sarber, Greg J [SarberJG@BP.com] Sent: Wednesday, February 27, 2013 1:08 PM �e'"l 2714 13 To: DOA AOGCC Prudhoe Bay Cc: Daniel, Ryan; Kilfoyle, Jeffery A; McMullen, John C; Burnett, Richard D; Rossberg, R Steven; Sheffrey, Tom (Fircroft) Subject: Notification of BOP Usage- Nordic 2 2-26-2013 Attachments: Nordic 2.2013-2-26.BOPE Usage Report to AOGCC.doc All, Yesterday Nordic 2 concluded a BOP test and attempted to resume drilling operations on well DS 06-24 in the Prudhoe Bay Unit. Upon opening the well back up, 440 psi pressure was observed on the well. A successful bullhead well kill was performed. After checking for flow and confirming the well was dead, the rig resumed normal operations. Attached is the completed BOP usage reporting form for your consideration. Please contact me if any additional information should be required. Sincerely, Greg Greg Sarber Operations Superintendent RWO/CTD +1 (907)659-5329(Office-slope) +1 (907)242-8000(Cell Phone) Harmony 2157 Alternate. Dave Newlon Blow Out Preventer Equipment ( BOPE ) Usage Report to the AOGCC The purpose of this document is to ensure timely reporting to the AOGCC of any BOPE use to prevent the flow of fluids from a well. Field Superintendent Name: Greg Sarber Wellsite Leader Name: Tom Kavanagh Contact Number: 659-5329 Contact Number: 659-4393 Traction Number: 2013-IR-4363169 Well Location/Name & Rig Name: Nordic 2 rig, Well 06-24B Permit To Drill (PTD) Number: 2121900 Date and Time of Incident: 2013-02-26 15:00 Original Scope of Work: Pressure testing BOPs Operational Description Leading up to Well Control Event: While drilling the lateral section of the well a bi-weekly BOP test was due. The well was shut in for 13 hrs for the BOP test. Following the test the well was checked and 400 psi Pressure was observed on the well. BOPE Used and Reason: The well was lined up as per the standing orders to the choke. The Blind rams and Choke valve#13. ✓ Is a BOPE Test Required after use ( Yes / No): If no, why? Yes, these were re-tested prior to resuming operations 24 hour notice required to NS AOGCC Inspectors prior to testing BOPE components. Plan Forward: A Bullhead kill was performed and the well successfully killed. Additional Comments: Email to AOGCC North Slope Inspectors within 24 hours of the incident: doa.aogcc.prudhoe.bay@alaska_gpv_ Email CC List Well Integrity Team Leader: Ryan Daniel HSE Advisor: Jeff Kilfoyle Engineering Team Leader: Ken Allen, John Egbejimba, John McMullen, Dave Reem Wells Operations Manager: Steve Rossberg Wells Intervention Manager: Doug Cismoski Organizational Capability Tom Sheffrey BOPE Usage Report for AOGCC Rev 1 September 1, 2010 w \,71 jys' THE STATE Alaska Oil and Gas 1- ' - '1' °fALASKA Conservation Commission ~ *, GOVERNOR SEAN PARNELL 333 West Seventh Avenue 0p ip+- Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 06-24B BP Exploration (Alaska), Inc. Permit No: 212-190 Surface Location: 817' FSL, 1033' FEL, SEC. 02, T1ON, R14E, UM Bottomhole Location: 1953' FSL, 1216' FEL, SEC. 02, T1ON, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED thisday of December, 2012. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED ALA OIL AND GAS CONSERVATION COMA ON DEC 13 2012 PERMIT TO DRILL 20 AAC 25.005 ,AOGGC 1 a.Type of work. 1 b.Proposed Well Class: ®Development Oil , 0 Service-Win] ®Single Zone - 1 c.Specify if well is proposed for: 0 Drill • 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates 0 Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5. Bond ®Blanket 0 Single Well • 11.Well Name and Number BP Exploration(Alaska) Inc. Bond No 6194193 • PBU 06-24B • 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12500' • TVD 8913'ss ° Prudhoe Bay/Prudhoe Bay . 4a.Location of Well(Governmental Section). p ,y 7.Property Designation(Lease Number): Surface: iD A' .i- ADL 028311 • 817'FSL, 1033' FEL, Sec.02,Tj.6J R14E, UM • Top of Productive Horizon: Day �) 'v 8. Land Use Permit. 13.Approximate Spud Date: 2903' FSL,3111' FEL, Sec. 02,TyN, R14E, UM _ February 5,2013 Total Depth to j1,7)12.- '1' 'v 9 Acres in Property: 14.Distance to Nearest Property. 1953' FSL, 1216' FEL, Sec. 02,Ty'N, R14E, UM 2560 23290' _ 4b Location of Well(State Base Plane Coordinates-NAD 27). 10.KB Elevation above MSL 71' - feet 15.Distance to Nearest Well Open Surface. x 685943 • y-5941415 • Zone- ASP4 GL Elevation above MSL: 37.12' •feet to Same Pool: 500' ' 16.Deviated Wells. Kickoff Depth' 9475' . feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 113 • degrees Downhole: 3257 • Surface. 2377 • 18 Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f or sacks Hole ( Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4-1/4" 3-1/4"x 2-7/8" 6.6#/6.4# L-80 TC-ii/STL 3095' 9405' 8669'ss 12500' 8913'ss 165 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft). Effective Depth TVD(ft). Junk(measured) 9970' 9176' 9878' 9883' 9110' None Casing Length Size Cement Volume MD TVD Conductor/Structural 79' 20" 1930#Poleset 79' 79' Surface 2496' 13-3/8" 2200 sx Fondu,400 sx Permafrost'C' 2496' 2496' Intermediate 8137' 9-5/8" 500 sx Class'G',300 sx Permafrost'C' 8137' 7678' Production Liner 1207' 7" 237 sx Class'G' 7965'-9172' 7514'-8549' Liner 953' 4-1/2" 135 sx Class'G' 9017'-9970' 8418'-9176' Perforation Depth MD(ft): 9740'-9850' Perforation Depth TVD(ft). 9001'-9084' 20 Attachments: 0 Property Plat 0 BOP Sketch 0 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ®Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval' Commission Representative' Date 22. I hereby certify that the foregoing is true and correct: Contact Troy Jakabosky,564-4868 Printed Name John McMullen Title Engineering Team Leader Email Troy Jakabosky@bp.com Fe,re_ ,f OH/t/ Mc/A Utl-w Signature _/Z., - MA 7i /lo SS Phone 564-4711 Date (Z- / 3 / Z Commission Use Only Permit To Drill _., API Number Permit A p oval D te: See cover letter for Number: 2 i a / (_.) 50-029-20822-02-00 (�t?��IZ other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas L3 contained shales: Other Samples Req'd ❑Yes E7 No Mud Log Req'd. ❑Yes re No 8 0 P -t-t-5 f Iv 35 0 p S / H2S Measures' E r Yes ❑❑/No Directional Survey Req'd- Yes 0 No Spacing exception req'd: 0 Yes LJ+• No inclination-only svy Req'd 0 Yes 12/No APPROVED BY APPlin:: (� / COMMISSIONER THE COMMISSION Date / /2&// . ^ �, - �, Form "s-d 1 1/ 1 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit Form and At�chments In Duplicate V -FI2-/I 9/r /% ';__ To: Alaska Oil & Gas Conservation Commission From: Troy Jakabosky bp CTD Engineer 0 Date: December 13, 2012 Re: 06-24B Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well 06-24A. CTD Drill and Complete 06-24B program: Rig Start Date: February 5th, 2013 Pre-Rig Work: (scheduled to begin Jan 1st, 2013) 1. 0 MIT IA (passed 3000 PSI) 9\6\2012 2. 0 MIT OA(passed 2000 PSI) 9\6\2012 3. W AC - LDS, AC PPPOT-T(passed 5000 psi) 9\13\12 4. V PT MV, SV, WV. 5. S Whipstock drift to 9525. . 6. E Mill XN to 3.80 at 8997' 7. F Load and Kill. 8. E Set retrievable 4-1/2 KB Packer Whipstock at 9475, 51° ROHS. 9. F Test packer to 2400 psi. 10. 0 Bleed wellhead, production, flow, and GL lines down to zero and blind flange. P 1/1"" 11. A- 11. O Remove wellhouse, level pad. 3 1 2 " 9 Rig Work: (scheduled to begin February 5th, 2013) 1. MIRU and test BOPS to 250 psi low and 3,500 psi high. 2. Mill 3.80" window at 9,475' and 10' of rathole in Z4. Swap the well to PowerVis._ `3. Drill Build: 4.25" OH, 674' (22 deg/100 planned) with resistivity. 4. Drill Lateral: 4.25" OH, 2351' (12 deg/100 planned) with resistivity. 5. Run Triple Combo Open Hole Logs . 6. Run 3-1/4" x 2-7/8" L-80 liner leaving TOL at 9,405' MD. 7. Pump primary cement leaving TOC at 9,405' MD, 34 bbls of 15.8 ppg liner cement planned. 8. Perform liner cleanout with mill, motor and MCNUGR/CCL log. 9. Test liner lap to 2,400 psi. p u ) 10. Perforate liner per asset instructions (-200'). 11. Freeze protect well to 2500' TVD c2-12 -11° 12. Set BPV, RDMO. Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Set generic GLV's with SL. 3. Set liner top packer if needed with slickline & test to 2,400psi. , Mud Program: • • Milling/drilling;. 8.6 pg PowerVis for milling window and drilling (678 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" From 9,475' MD to 10,149' MD Liner Program: • 3-1/4", 6.6 lb/ft, L-80, TC-II Solid liner 9,405' MD — 10,149' MD. • 2-7/8", 6.4 lb/ft, L-80, STL Solid liner 10,149' MD — 12,500' MD. • • A minimum of 34 bbls of 15.8 ppg cement will be used for liner cementing.(TOC 9,405' MD) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. . • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 112.93°, inclination at kick off point is 40.59°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—23,290'. . • Distance to nearest well within pool— 500'. Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • • Triple Combo Open Hole Logging: Gamma Ray, Induction Resistivity, Density, Neutron. • • Cased hole GR/CCL/MCNL logs will be run. Perforating: • SWS 2", 6 spf, pert guns, 1-1/4" CSH work string, & 2-3/8" PH6 • The primary barrier for this operation: a minimum EMW of 8.4 ppg. . • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • 06-23B PB1 center to center distance: 272ft. status— plugged back • Hazards • DS-6 is a H2S pad. Well 06-14B had 300 ppm H2S on 5/12/2022. • • Most recent H2S level on 06-24A is 10 ppm recorded on 1/25/2012. ' • The lost circulation risk in the 06-24B is considered to be medium. Reservoir Pressure • The reservoir pressure on 06-24B is expected to be 3,257 psi at 8,800' TVDSS. (7.11 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,377 psi. • • An EMW of 8.4 ppg for this well will provide 586 • • psi over-balance to the reservoir. Troy Jakabosky CC: Well File CTD Engineer Sondra Stewman/Joe Lastufka 907-564-4868 S M 56 �1 �y mLL t. 0 Ca 1 co 0 0 J iA+i C a L N r � Q N = N m a E W O 13 aLCI gi maca c0 ; Z :mg a CO O m= z • a al z 1 Z — a Z � Mal 0 , m co N o CD n 0OCV €. CO c m y 10 E CO N O) M ,c 0 O N p. N 0 r M Cl) O 0 °O O ,- ¢ ! a oo „r N «;i g OU a v n ° 1 C fn 2 O 0 N �• N ..7.. a N CO O N y m U N N C) O Z > N •V dK J .0 7 Q Jcc .) a m m U — o 4) N > CO (n •• 7 ,- C!)> 00) d J VOC � c m O) COj N a - us N d 2 C Q co c .0 C MT c C H W 0 u,2 0 D os = c 7 °a O Il O d > J J 0 4; V 7 O ; C G « '�C) D) C 13 d J J L ^ k" c 0 y u c 3 a a y c o c c `m 0 m m coo. 0 0.- �U 0 E L L .0 C``+'i o O o re m a. R y v_ �, O —up �' t e3 0 in coo 0 0) C)" o M .oi > 0 a 15 U) o n o = = x G CD O CO N CO O i o DaCI) CO O N aO Q 1M. • 0 d Cta U) CO 0) `a _. a) Q° c o. ' t• Ea ,: c 0 O L Q O. Um W • ..a. > H . N CO c 31 L c re 10 "0C N CO a go o O R L C L 2 W N t 0 a) C a s; 2 o W 3 .fi 9 � G Z o Z a aM m W A N O 0p N I c d �`± ei I- 0 D 7 a N m ... aN� E. E ou o N o a m mZ xO o o = = LM ( v C. > f-Z o O O N O O O o @ O I- O E O O O N Q m O m o -- m N x. J o d0 a 0 O m E Q t C¢ O Cl) Cl N 43 Z C a N N 2 0 (0( 0 7d11 c a m aa oN N d a. o o d ) co m cD m 0m y tL � vmr COQm 2W O -C' m N N c D Z Q �r + + C Z a a o o a a ■ r of N kr W •• o ° ,.°E x ��=M Ed - p p a m w c .. N m c N C W c 2 O O CO tg 0 C ), 0 O O O O O O m C 2 C 11 41 14 a m , .0 01 d co O N n. E = _ a d C O) Ci O m [�" o w w d d m Ti.` Cal O N r .0.. O m 0) d C m A m 7 N m co Z Oai • • CO O O O O NVCD _0 ' OO CO LO LO N.. O O O O O O O O N CO CO r 0 CO O i O O Lo LO sr LO to 1- 0)- co coNCO CO OO 0 w al a F C') O O = N O Cl) o n N sr n CO O sr N CD O CD N u) CO C) .- N- o) O LO CO LO O CO N- CO LO O Q N. V I n O N LO u) O N N M O u) O) r n Q V N 0 LO CD CO 0 LO 0 N U) 0) CO Tr CO I ft O CO CO O O) 0) C) O O O O 0 O m N N N N N N N M COc'L) C'7 C) C') V) (.) l' TN.--. v > ":1- (J) C) o N LI a- ....> ` CO 0 CO J 9 Q 0 CMO 0 0 CD CD CD 0 CD 0 0 0 0 0 Nf0 CO U $ O N C) N N N N N N N N N N N y 2 E LD N N N N N N N N N N N O Er) LA p C)O O OI ❑ 2 c F w C) N CO N- 0 N- CO LO N N O LO 00 LO CD {„) .a 0 L1) M CO O N Nr 0 0) CO C) CO LO C) C O O co N6 CO N W n LO N E .c - 00 r CD Nr N O) 0) Co 0) N 0) CO CO O CO co co co co M n n n n c0 m C) w CC = M M M M M M CO M M M M ri M M 12 G •y . U) 00 co oo co co co co O co M O oo oo C co O o co CO CO CO CO CO CD CO CD CD CO CO a) •• o w ID c G1 C) N O v fl'-'i yfl'-' p o_) c • O ` ` p m w CO 0 N N- co CO u7 CD O) j O CO LO CO O r C) N - O LO n o w w w V N E N UO CO CO f0 CO CO OO a n n n d'70 t d 2 C CC')N- COomC V v < v Lc) LO LO (D re CO CO O ❑ ' C >' M M M CcM CcM ccM M M M M M p ❑ O 3 CC O)'2 -2 *- =' C of V Nr - Nr ..) F- 2 2 (/) ❑ 'O co m p 0) rn m 0) 0) Q) LA rn rn rn rn rn 0) m C N C 'p Z l0 lO LO u) u7 LO LO LO LO Lf) u') U) LO LO = 0 coCa CC O I co co ❑- M n n LO co (0 '- CO) 0 u7 O CO N Et N E aNn> >0 O 0 LO CD m M LO C)LO 0) O O m > > n r M O) UO LO O) sr O CO a ❑ U 2 2 N- N N co m O D1 C) LD CONr O O O O O O O O O O O O O 0) O • I C L N N N N N N N N N N N7 L O I {SY O 0 co CD N- COO) CD m N. M r N At 0) 0- 1 2 sr O N N n 0 (0 0) n O LO CD [7 Ca C) CD M M N N V V' N- O M N C7 E O o co v v N- o m CO N 00 N- v CD a) co C O O O O O ' N N CO ir At I CO Z Q Q N•••• N N N N N N N N N N N N N N a. o Z 1 H U 2 2 V' co - n N 1- CO CO 00 LL) LO O N _ N M 0 co CO r` N- 01 n CD N CD MNt I 0 0 0 M M CO M N N 0o O CO O O N CO Nr O 0 a- sr LO CO n CD N N CO 1` n 1` 1` CO Co O O CO CO Cr) m m . 0 > m ao ao ao co CO ao ao 0 cc cco ao co ,--e n O N >+O 0 03 M M N- CD LO CO V CD CO n N 0 o)0 LO O O M n V LO OO 1` N M O CO (p r O MN O co n - At CO N- o C) Tr O O a- N M CO Nr u) u) a- M Ln CO I d C N CO M M CO M CO CO CO CO CO CO d • .p (O N '",L v m N C6 1 CD a C) C O O C) E i: N C) CC o N- V) CO CV U D. CO _ Cl) .- M d CNv 0) O 00 0) co v v co CO CO CD Q C) v LO N 1` CO t` LO O N O a) 0 0 0 N- o) o of Lo O n Lo Lo U) ' Co CO O CO O CO CO a At V LO LO CO n n n n Co O co • m ❑ r` Ll] o J ❑ O) O O U �••• � m O O O v_u7 C ?„� ❑ Q (CO m F- aorn � o 0 CO n o ' ' N N C E O N Z d co 0 0 a al 0 0 0 a_ O O O a0 T O O 0 ❑ 0 0 0 0 0 0 0 0 O O Nr N n UD O O a O co O O O O O O O O N N N •* W a m sr o � o n rn o 0 Lri U) 0 `D N. o Lci C') 0 0 0 v o MegZ o E a- v_ 3 v_ v_ y v_ „ LO LD CO m Co N- r` w CO O O ,6 '0- ENO ui F o °O 0) U) ❑ rn a m O o = of of o) o rn 0 c 0) C o o c tig 0 c . O c T LL d F Y W v N CO n w r m 4Z F o °f d 0 ami Cv o Z Ua ink ❑ U) a N • . CO 'et N 0 N. 0 CO 0 V 0) 0 At CO N. 0 CO CO 0 M CO 0) CO Q M r n 0 (O O r 0 N CO 0 0 0 O) O W r O 0) (O 0 a m CO t M O) CO a) CO ui U) U) N N N O a) a) CO V 4 4 Q Z co co co a) 0) v Cr 0) CO CO o) o) o) o) 0) CO CO o) rn o) rn m mvim. co L LL r) N F p _ O = N O (i) O LO CO CO CO N CD C- CO CO CO CO CO CO N CO a) CO M a) co (O co co. O) O N CO Cn 03 a- N- 00 O CO CO CO O Q V' O CO CO CO N- CO M O M r CO CO O 4 N (O a) O CO a �` N N r M 0 CO N CO M CO M CO r n N r W CO �/ _ 0O O O O O a0 W N- CO o CO M N N N- O a) a) 0 O u) r M M M Ch N N N N N (" N N N N N N N N N (_) r U ; tt C/) m O N W d r O U ` N 0 U) N O 2 Z O O O O O O O O co O O O O O O O O O O O co C J O 3 Q O O O O O O O 0 0 0 O 0 0 0 O O O O O O O V" m CO U , N N N N N N N N N N N N N N N N N N N N N N m Z (O O) 7 O0 CD 0)E m N a) .C p O 2 c H 2 w m C. sr (O cr M cr 0 MCO 0 0 CO CO CO CO U .a O O O f0 O M N- (O (O M O cr U) CO 0) O (O CO 00 O) C O N O a) O) N CO CD N- O 0 CO 4 a) N CO W `7 t CO co 4 CO M N- N r (O 0) M 0 0 CO N (C) 7 CO M O a) co N N M CO V CO CO co ao O O) O w N = M V' sf (C) (O CO m E N r co co co co co CO co co co CO CO CO CO CO CO CO CO CO CO CO CO Q' C as co co co CO CD CO CD CD CD CO CO CO CO CO CO CD CO CO CO CO CO m o W is a) O U a U U ` 7 O C m U O 0 V n ' CO N CO N r CO CO a) (D CO M M M CO E ` - m .� COm � M N O) ao Cn CO(D h N. � (D Cr� (O � COa0 V COM O O w m m 0 y) O M N CO CO M r CO 06 4 O CO O u) a) CO V m D: a) m O ccoo coo codcco co co co c0 ND N CO 0 CDD COO (i (n CO v COOCOQ) COam K To p ('a1g t ri ri c• ri ri ri ri ri ri of ri of of of ri (" ri ri ri ri ri J I- r2 Z (/) p O a) O) a) a7 CO COo cr Cr Cr Q) Q) CO cr cr Cr Cr Q) CO CO Q) 0) 0) 0) a) O Q) 0) 2 CO CO CO CO (17 (n CO Cn Cl) CO CA CO CO CO (f) (f) CO (n (n (n Cl) 0 d a) N. N0) 'a' I.- h O 0 CO m 0 N 0 CO CO M co N.o CO Et CO co co M r r 07 r M M N N CO O) O O O O) CO CO O O r • N N m r CO N O r r CO CI O O 4 a1 O) O) CO V- 0 CO 0 N CO CO r CO r CO 0 CO M u) CO CO 0 CONr (O CD COu) (O cr M CO N O O 0) a) 00 r r IiiIF ( ( ( r r, „ , , .i . 7 7 . . . 7 7 r r r r r r r r r r r r r I- 0 U _ _ _ N CO 0 U a) N V N. O 0 0 M U W 0 CO r CO a Q) N. Q) CO O CO O M O) I� O O 0 N ID O o CD [I- CO m O N CO a) n CO a) M CO V CO a) CO N CO OO • N co O O a) co r CO CO CO CO CO N CO CO 0 CO CO a)a) 0 CO cr Nr cr M CO M N N N 0 00 O 0) CO CO- N N N N N N N N N N N N N N N N N N N a- a- a 2 O a CO co .ct CO M N 0 0 CO o 0 a) CO cr CO CO 0 0) N a0 N N CO CD CO N CO 0) CO 00 M 0 (D CO O) CO 4 O) a) CO CO CC) CC) CO CO CO r CO a) CC) CO N M ch sr v CO in a a a a v v v v v a a (n (n (n y a) a) a) a) a) o) rn CD a) CO CO CO a) CO CO CO CD CO CO CO CO Cl) CO CO co CO COco CO CO CO CO COCO CO co CO CO CO CO CO CO CO O CO v- 0 co CO co co co N. co a) O N N 0 CO n O) O O O M CO M CO T N CO CO CD CO 0) a) M r r r M M CO N r M n N N 0 CO O CO CO CO r a) CO O O CO CO N... CO a) a) O O N M M 0 0 N M M 0 0 Q J M N- M CD M N M M O CO n R N 0 N CO CO 0 0 CO CO Q 0 I- CO N. 00 CO r- N O cr N CO V' cr Cr Cr ch O O O O 4 CO CO CO .4 CO N N .- O O a) a) W O a) a) a) CO N N as co co CO co CO co a) a) a) W a) co CO CO CO CO CO CO CO CO CO U T co m O C o Q 0 Co co n '0 0 QN N C 0 Z 0 0 0 0 d0 0 0 0 0 0 0 0 0 0 0 0 0 0 N. a >' 0 O N O N 0 N O O N 0 O O N O O N 0 0 0 N S N N W > 0 0 CO O M 0 M 0 0 M O 0 M 0 0 M 0 0 0 ri c} 0 0 CO o (n 0 u) 0 0 CO 0 0 0 0 0 0 (D 0 0 0 0 '5- 11.og I 7 s- N N M CO v v (n CO CD I� CO CO O ON Cr) v v l hWt9 C N a p O O O o O O o O O O O N O O O O — `— a `— N 0 gla [- a o« m m m m Z r) U a 3 p a N M 0 N O 0 0 O N N. 0 N O 0 c0 N. .. O NJ: CO N O r O O N CO O C) N 0 CO a R O 0) O O O6 O O O O CO CD M C) 03 _.0 Z D1 O O O CD CO 0) 0) 0) 0) N N. N C) C) a) .-. (p R o lL M N I- O ,_,c co V N 0 CO 0 CO MN 0) u) CO N. CO st CD C0 N CO d co Co co — O CO CO CO '- CO CO O NY N O Q st N O r NI: n O s— N sf (O O st N O &�p)� N O O O O O W N O) CO CO V I 0 O) co r r co C() O C) N N O O 0) 0 (nom . . . . 7 7 0 N. ▪ 5 " ✓ (1) a) o N W j (i I > ` CO 0 u) a 7 Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NY ca R 0 , N N N N N N N N N N N N N N N (i a) Z r- — T T T T O C a7 C • C O a) ca 3 m .c g --I 0 M C H M wW -- a) N O N. 0 N CO 03 O CO O N N. 0) 0) O .a 0 O u) O N. N r NI: 0 sY N C p 0) M 4 O 4 T (O O co N co 0) 0) t N O CO CO O CO N. N. M CO CO CO a) iii O N C) co C) sr CO to (D CO CD N. h N- 6 N n (f7 u) tri l0 CO (f) tri (n l0 lO (O (f) UC) c .y = ao ao ao ao co co O co co co co co co co co C R .... co co co co co co co co O CO CO CO CO CO CO d o w R a) r 'O 0 y • C O C a ` LI CO M 0) 0 CO 0 O CO CO sF 0 CO 0 NR W N r 0 CO O N N C) O O r N r o w a) a 0 N C) O O r p) p) N O O6 CO Co O O u) 0 a) X A R O N N. 0 0) N O N. O N M CO CD NI' vat N Q' t y a C M N N a- e- 0 0 0 0) 0) O N (D (O CO o Cl ,-, t « :E C) C) C) C) C) C) C) C) N N N N 0. N N p > o 7 Rr v v v v sr sF v v v v < 'Cl V' V' .4'J F- Z U) O O m D7 O D) C) d) co coT OI O O (A 0) 0) Z Ili CO u) tri U) ui ui (n (n CO u7 O UCi C!i (n 0 0. CD CO (NA 0) N O N. N. O O N CO 0) N O CD O N O O O 0) (D 03 CO (1,1 CO N N CO O C) M )1) 4 M CO 4 C) N N co O T sF O CO 0 M N C) N N. N. O C (0 u, , CO sr c) (') N N N O 0 0 _ 0) st O M 0) N. 03 CO 0 T sr N N O a V co co co N. O CD O N 0) O N CO CO CO 0) N CO 4 C) CO O O O CO n sf 0) st Q) N CO 0 0) N O CO 03 0 N N CO N CO 0 CD O r N r CO (O CO CO CO ' co N N CD Cl)—' r .- .- .- r Cl. z -- CO NI- o st M CO N. CO N. O 0) N C) C70) NI. O 0 O NI- O N. CO r CC) st .1; Lo . . CO O O M N Ni Q) 0) (O O co co N Cl) co ON. N. Cr) N. n N. CD (D (0 CO CO _ Q) 0) 0) 0) 0CO 0) 0) 01 0) 0) d1 0) 0) 0) �EO O O O O co O O O O co' O O O O co sY N CO N. 0) 0) 0) O N. V' N N O O O st 0) CO CD O O CO CO O C) O O N N O N O O O N N st 0) N O co sr sr CO N N C) CO CO CO r r O 0) ‘- 0- 03 Q 0) Q _ _ J O N N 0) m O O O O O C) Q CO O O NT N. r r r COCO N CO O D) N: r N r 0 O O O O O C) O n M Ni R O O O co co 0) 0) 0) 0) 0) 0) 0) 0) O 1- U T a- a- .7 R L) EmCO at Q r cn m L -o N N C o 2 m CO O N d Z 0_ 0 _0 0 0_ O O O O _O O O O O 0 O N. T 0 0 0 N 0 N 0 0 O N 0 0 N O O 1111 1N W > 0 0 0 C) 0 00 0 0 6 cc; o M c o 4 0 0 0 0 0 co 0 0 0 0 o st o oN- II r 1IN= o u) CD N N 0 0 01 o N c) c) sr 0 So NI- 1W0 _ Cn CI fD r r r ao r r r O N r n C .. 'O % r .-- r N eN- �_' � R O C a) O. V 03 C (0 m F C 0« a) a) a0i N • CO Z U o mei 0 0. N • N. ^ V a Z 1 m 0f N CO ' co r Co cci CO 0 ii) N co CO 3 co LUo cO co O C a) O co b (A b b 0 L M Cl N CO M N Co O Co Cov vJvo 0) N- v a co os z z z z z co r N CD N M n N CO LL) O CO CO O N r O C. N CO cc; cri N W CO S2 LO LO LO r d in in in • CD 0-1 .o o Q J o O o U 0 0 o r` r- '1' N cp Z Co ? CO U)- y 3 7 C Q O O O 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 O 2 2 F W CO sn O O 6 O O O 6 CO Co N r Co O Co N V N M CO M r N- M CO r CO co M N (sr CO V N CO co M ,- CO O co V U) LL) O N M N O r N N O N CO CD CA CO M CO Co) o u5 LL) V V LL) L LU 1 LU L V V V U) in Cn in LU Cn V sr- ii C Co Co CO Co CC Co Co Co O Co Co Co CO Co Co Co Cb Co Co Co 00 • Co Co CO Co CO CD CO CD CD CD CO Co CO CO CO CO CO CO CO CO CO C CO d L W w d c) E re c m R a, ° o o O 000000 O o 000000000 O c ai U La co 0 o D co co O o O o 0 0 co 0 0 0 0 0 co 0 co 0 o = u) Co O O O O LU o o U) N N CO CO CO V O LL) O LL) Cn Z C U d O co LL) so CO CO CO VCO CON N N O Co Co O d ` C) V O M .,- O O O r M r co )n o O r NCO NT LL) CO LL) C CO O w d N U c c5 N ri V V si V V V V V V V V V V V R TX 4- r m 0) rn rn rn rn a) CD rn C) 0) CO CD CD rn CO 0 0 0) D) rn rn .:. o LL) LU LL) LL) LL) u) u) u) LL) LL) LU LL) LL) CCi U) U) Cfi u U) CC) LL) p ❑ ❑ 0 3 La Z J 1- E Z Cn ❑ 0 0 a) w N _ T--. r N- O h 0 N- N N LO CO CO Cl CO O O a) N N M M V N V N V Co CO It) O) CD O 1� N N Cl CD N- h Co CO CO r M CA Cr) N CO CO N- N CO Co C_ _ N CO M M CD t� Co Co V V N V r M N r N- N r • ., CO 1 co_ M OD u� u1 T CO CO CD CO CO N N u? O Cn 3LL I— + .w . , .- i s co co 0 N N („� In N-r-: N- r O ,n1...: V N LO V CO LL) CA r N N LL)O LO ,- CO O CO . O CO O CO CA CO IX) M CA V 0) a O N L-- L- CO O r) O CO V r.- r N- CO n) V M CA in Co CO m ut 6 v Co ' Co Co CO Co CO O , O LL) N. Co N O Ca Co o Z rn Co Z CO (O 0 CO m n Z M m - o o L - M V O, + CO N Co CV CV _ _ _ 1- N N N CO ✓ V CO co O co O O N N O O O a 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 O O O O> 0 0 C. 0 0 0 O O> 00000. 000C/ O Cc; Cc) o f o 0 0 0 0O ri o f o 0 0 0 0 0 0 0 o ri LO N- LL) a rn v a) v a) a) F- Co m co at) oi aD CO CD CO CD O 0 O 0 co o O= O O= co o O o0 0 00 O 0 0 00 0 o • o c°— v v rn rn r N N V C') O O O p O O� O O O O p O O p O I 1 5 1 o 0 0r- o o� o g L T T E O 0 CD (U d U (U U d ,L Cn co r N N CD d .) N .c -c N sr N C U U O U En U o 2 m (o Cfl if; O- N CO u w N Z o_ d 0 O d 07 E) O)i u) DC u) 01 a S IA .R, N Mco @ y N M V Cn co LO C y ,- N M V LL) CO N- CO O) .0., N CT W d N N N - Cn C C C C C C C N O N C C C C C C C C C C N '1- Mom E Ind a.0 a,E " E mo '0 0 0 0 0 0,L TE m'o '0 0 0 0 0 0 0 0 0E v �W� c CO .= 12' Ca =.0 m =.0 m =],0_ 0 0 d 0 0 CO C c O C Td d o_ d o- d n_ o- o- m C C bi' d m r A E F m o F N O W Ca 0 I- 08-8. a. CC 0 F O 11,'_' d _ a C) �L N Co 0_a- Co ad Co 0_0- Co 4d Co-8.0- Co ad O E ii u� v ' ' v v v v ' ' v [.... oN m y CO1a N N N N N N C7 Z 0 0 (n 3 ❑ F I- Co CO Co Co Co Co N co 1:3, z / c ''S 07 oOD N ;o- CO coin co :::::'„,0:: :::::, oi V N s iU s O rn CO '","'.,,,f"-3,•..3,r #. t U n CO N W 2o u) in ..,.00 0%0, STi) m U 4 > Z ✓ as z U N- N N (U CCOW '' E • - m a) 2 0 0 0 0 Tu a) -- ` C ❑ 0 o 0 0 2 C F- 2 W V W CO O co co M N Ln CO O nO x�' -• .s. a0 a0 [0 y, C O L ! .• 2 Aga C MEI O CO 7. inN R •• D 0 0 O O C 7d U ) O O O O • • 'Q tli V0 c 00co_ CO CO M ' MMC)Od4V d Nv 0) 0) vU d O > 60) C) C) 0 mta). ri 43 ui W o � O• ❑ O 7 03 O an0 I� N Q IPw O O) O) CO I- M CO O C O) 0) O U) J N co O O 0 , b I- W O O O O O 'O CO C) N O U COv N - N1 U) ❑ O d. CO 4 C>0 44 C ❑ N 1n m N N ^ a) O N CV N. v N.Z N- CO E 0 c Q) La E a- @ co N- 0 a 0 c c O ,- N co V to CO n co O) 0 0. M 0 H Y w � u) co N- W caI- O o O O MN O O n N. M M N 0MN W m ON n O N W 0 O> 0 0 I` 0) Q) 4 O r N CO C- U) 4 CO N C• O~ O O n N a I O 0) V- V" In CO n CD U) 0) N I- O M 0) O O O O 0 0 C) N CD CO co O) r- If) CICN T cn d W N N N N N N CO a n ❑ Oo U CO r 0 CO IN CO I- O) CO V' N n 0 0) In 0 O) 0 N V' O 4 O ,- N .- O O CD Q) CO ,- C 0) CD CD ,- CO CD 0) 1'- OO OD O Cu) CO M N 4 O 4 N O) CO CO CO O CC) M O 4 4 O CO O CO h -. CD N CO O CO CO O) CD 0) CO O CO M O O 0 a0 J O O O O N- N In n V V M N O O C� CO LC3. N U) N- Z 5 N N cV cV N N N N N N N N N CV r ++ N is m m o In O O N N. M h IN M CO N CO CD 0 0 O LO LC") Q) M O O d) 0) CO O co c0 IN 0) CO VI. O) ,- N CO O] M Cf) CO If) V O g O O O CO CO V .0 O) 4 O) CO M N 4 O) CO u7 CO CO O N 0) M N CD N M aD ' CO N V V CO V' V' Cn IN r CO O Q CT 'L d$ CO C- N h aO CO CO 0) 0) a) C) 0) 0) 0) 0) C) 0) 0) 0) W ski.... ) ❑ CC) CO CO CD CC) CO CO CO CC) O CO CC) O CO CC) CD CD CO CO Cb ca U T d O O c CC C O O E Q p 0 co C U N. c) -07 CO O O o 0 c) O N N N N N N N N N N N N O L - ❑ , V r U O] CA N 7 in in in in CO CO CO Q) 00 M M M M M M M a0 W M O -t 7 N N C G^ O n a) CO N. M V U) CO Cn CO 0 CO 0 0 CD ' 'U 0 O m CO CO CO C CO '.� co 4 4 4 CO CD CO IN O N M CO 0) .- Tr t- co co CO Z a a o o a 21 co d ❑ O) 0) 0) Q) T QI 0) 0 0 0 0 0 0 N N CN- C Cl. ■ - Cl. O 2 N W y. N!n C C_ C_ ) V 110.01Z a'E " E o o o D v �W. c .. `i m cc m caa a c Mi I-10 O u_ (0 O C cv 0Ix c- U .. a o) co Qa co ?-u-, Q 0 Z 0 12. U) 5 5 0 co co a CCI • ht N 8 W ) - < Y All S W % m ., o0 8 - M z A g 0 - I 8 \ _ , / 8 ■. 8 i E o a ;,:. E - L y NSU _1i— o go p _ y N Q O o tb m _ ,,o p r = o o o == 8 d 8 8282 `� _ o K .�H m " N ry - = m m (II!/j OSI)(+)yuoLU(-)4nno _ g E 0 O 71 1\'' U if a CJI 33g. 44o o 8 8 E i s • UI N 2 5 0 a RR'N, ��RRRR� 8 mm °� e, 18 888$$c28888888s$ss aao om 01 vZ N22$88888888888888888 0p 888888888888888883aq QN = — ..a a A - r g. E °I- R96Xi�io8 7:,,,VSSim$S�Mq -BarRRR" -w" w L,(' 1 0 r gi . ,.. 4\ ,... . =1 3E2 wm 3 d _ -R" msea�ry$$s-osnwa ° o mm IV ►A4r .TSM24WMESSAMRRRASn3MV= t ' § zil avm,mmmvg4,22 5o o ID 0 0 w`" 2 $$$$$$ryrryryry NNNnNryry$ o. o o ��Im� S - 8 * 8 a a ! m �� Ne,<�.,m�mm ^Nn,ev,m�mm� 2 m (u?/i 0L)incl.(' ie il-A an1Z h W k�MMi 0 MWb moo ■ M w W ��.E.E.., ,N /Q O z - N .. • - �= ■ 8 i P7., MEN II _, 1 i 1.11.11=ffi __ •ra) EMS • , 1 1 111111111.Mir ' i _ IN -- 1111 -§ E i7 ISR R - Ill ■�■, E MO g ga �W ■ ■■ ■1 Uhl - um igloos •�■ 8 zo, a a i■ii■■�iAMN to N N I/I_■■-I �P__ 8 1 ___ �. c Ko U a : N� o EN=FIANN ■WAN • —/I■■ a ■ • - g /!:! o IIE ■ ■ __g /11111111-`:'. IMO IIIIII i In ■■-■ ■ _I 12"mr ■■_■ U m� ,l da000 e rine as a _ .- ��8 ■-■■-■ ', 5 n o. 2 -. 006 •_••__M I■ S N ■_■ /■_■r _8 ■ ps_■— A e ! sin __ is !EmilIVATallIn __ a $ N s 1 R ss I § s § a & s s _ o s i a a 0 g (ui/a3 00I) (+)4uoN/(-)q2nos 0 W r E • YY eco— Imw ll N� ry m ry QQOD a ^foxntSo�Ji$�i8.m$n o-oq�r.ia,� rCC31gg > _ > N >o _ > �� N C N N " C (7 N N N -T N i1$$$$$$$FM$$$$$$$$$$$ Ery ro m m o c;+ (o m — ro N m N k�,mm"mmmmm9' oimtn� .. O a o (0 0 a 0 0 0 a 0 O 0 �e mXmAmry e _ o - o 9k o8N $$$$$oNrvnrvrvrvNrvrvNry g N tV N N N N co N N m (V N N t rg2mpry m rvm' (o m (o D o m (n (o (b m o Raa,.=$$$°d=°'R-1RgimaRm p " `a_' o 0 0 0 0 0 0 0 0 0 0 0 �m" W $*rv$.. firo' rE > s WLL� N N N N N N N N N N N N N C •z _Q R+Y �31A,�� n -m a I d ro CO m ro 2 (O CO (o (o CO CO CO CO f0 yy �? z 0 0 0 0 0 0 0 0 0 0 0 0 0 a j Ili CC + 1 i 4 / 4 / 4 1 1 / 1 i 1 1 G 3 � -$pq *m �g7:F $ R«gi8p N > some aWo > m > $ w 0 o . mmlgr811&8888881 &R M LLo N v > > N 0 > < > v v > < > m N N 0 _ C M O 0 0 O O c2 O O N $$o"v��hlrS$ nNN'nnnem%a�� t. ;74 o 6 6 o m a 6 o co o o o '' 2 �u AR,Ip Vig8:! t14�i8VR2naQ O O Q Q O Q ' Q Q O Q O �8 V N N N N M. co C V V h O LI N O O g 0 C? 2 O g 0 0 N g "�t8Wo °'M o (� m (o o cb 0 m (v 0 m (o 76 is YhS�fmR,�$8m� ¢ ii fm:wa �� ^nR8�9i6�I8%&�&88mm8&^m 0 0 0 0 0 0 0 0 000 . 0 0 E 4 2 a N N N N coM V V V a a ti'A' ry •g q q q 9 0 0 0 0 0 N jaFh l3 sS $ $$$ryry ���"�ryryr N O 0 0 o m W 0 0 0 0 0 0 W OOOO OOOO OOOOO Oi,inr a § m$ oog8"Qnrvn$ i 4 t 4 4 4 4 1 4 a i 1 v 4 u %e 'z? 8 8 8 0 0 i \p0 SA. E coC v2 u z !iITs g o � m 0 is z inl 0 O A lV 42 Zc - — 0 N Q on C - 4110 0 - O cO ON 0SNo O O �, - - O (0 co O Uc0 to ' X T � N m g�, RI a s vo(moo 6i,-1 �6 as -a `' yEy .. ng,.-:: 1 Q oN3 3a y�..- a w a - N c m N C /. - N - i N N ! E ii • 6 BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-24 06-24B Plan 7 Travelling Cylinder Report 04 December, 2012 • • vii BAKER HUGHES Travelling Cylinder Report 0 bP INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-24-Slot 24 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 06 MD Reference: newrig:Nabors 7ES 71.0 @ 71.00ft(newrig:Nabors 7E Site Error: 0.00ft North Reference: True Reference Well: 06-24 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 06-24B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 7 Offset TVD Reference: Offset Datum Reference Plan 7 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refers Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 9,405.80 to 12,500.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,446.60ft Error Surface: Elliptical Conic Survey Tool Program Date 12/3/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 97.00 8,097.00 1 :Camera based gyro multisho(06-24) CB-GYRO-MS Camera based gyro multishot 8,141.00 9,405.80 MWD Final 6-24a(06-24A) MWD MWD-Standard 9,405.80 12,500.00 Plan 7(06-24B) MWD MWD-Standard 9,172.00 8,478.02 7" 7.000 8.500 12,500.00 8,912.53 2 7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 02 02-24-02-24A-02-24A 10,500.00 11,442.00 896.03 333.29 562.30 Pass-Major Risk PB DS 06 06-01 -06-01 -06-01 11,583.91 9,325.00 1,125.39 506.27 650.66 Pass-Major Risk 06-02-06-02-06-02 10,025.00 9,850.00 898.40 144.04 757.64 Pass-Major Risk 06-02-06-02A-06-02A 10,025.00 9,850.00 898.40 144.04 757.64 Pass-Major Risk 06-02-06-02APB1 -06-02APB1 10,025.00 9,850.00 898.40 144.04 757.64 Pass-Major Risk 06-02-06-02B-Plan 5 10,025.00 9,850.00 898.40 144.02 757.66 Pass-Major Risk 06-03-06-03-06-03 Out of range 06-03-06-03A-06-03A Out of range 06-19-06-19A-06-19A 12,125.00 11,000.00 940.47 333.81 620.40 Pass-Major Risk 06-21 -06-21 B-06-21 B 9,525.00 11,200.00 686.01 434.57 258.18 Pass-Major Risk 06-22-06-22-06-22 Out of range 06-22-06-22A-06-22A Out of range 06-22-06-22B-Plan 5 Out of range 06-23-06-23-06-23 12,250.00 9,100.00 1,290.39 493.89 835.03 Pass-Major Risk 06-23-06-23A-06-23A 12,250.00 9,100.00 1,290.39 493.89 835.03 Pass-Major Risk 06-23-06-23B-06-23B 12,025.00 10,353.00 531.76 441.61 102.94 Pass-Major Risk 06-23-06-23BPB1 -06-23BPB1 11,981.70 10,606.00 271.95 424.67 -140.85 FAIL-Major Risk 06-23-06-23C-06-23C 12,209.87 9,375.00 1,291.49 492.48 820.41 Pass-Major Risk 06-24-06-24-06-24 9,405.80 9,525.00 449.83 80.64 379.73 Pass-Major Risk 06-24-06-24A-06-24A 9,475.00 9,475.00 0.00 1.60 -1.55 FAIL-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 12/4/2012 9:33:42AM Page 2 of 29 COMPASS 2003.16 Build 73 TREE= ' 5-1/8"FMC GEN 3 SAFET `ES: *'4-1f2"CHROME TSG"'* V�+ELLHEAD= FMC ACTUATOR= AXELSON 06-24A KB. ELEV= 71' BF.ELEV= ] \ KOP- 2997' 26' --15-1/2"X 4-112"XO,D=3.958" Max Angle= 41°@ 9777' Datum MD- 9573' Datum TVD= 8800'SS I I 2184' —I4-112"HES X NIP,ID=3.813" 13-3/8"CSG,72#,L-80,ID=12.347" H 2496' , GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE 4 3447 3425 22 T RK 0 09/09/12 y 3 UN 3 6104 5821 27 t 3 DMY RK 0 09/09/12 2 7766 7328 21 Mv13 DMY RK 0 03/14/06 1 8762 8207 35 KGB-2 MY BK 0 03114(06 TOP OF 7"CSG —{ 7965' _ MLLOUT WINDOW (06-24A) 8137'-8155' 8829' --I4-112"HES X NIP,ID=3.813" Minimum ID = 3.725" @ 8997' -1l2.� HES XN NIPPLE 8850' —I7"X4-1/2"BKR S3 PKR,D=3.870" 48872' —14-1/2"HES X NIP,10=3.813" 8930' —TBG STUB(03/03/06-)1 \� `., 8940' --17"X 4-1/2"UNIQUE OVERSHOT IBP H 8160' 44, I% 8964' 7"X 4-1/2"BKR S-3 PKR ID=3.875" IN ' 8997' —14-1/2"HES XN NIP,ID=3.725" Iiii 9018' --I4-112"WLEG,ID=3.558" 4, 9020' —ELMD TT LOGGED 9-518"CSG,47#,L-80,ID=8.681" — 9032' A l 09/14/00 To, 9017' 7"X4-1/2"BKRZXP LNR PKR,ID=5.250" 4-1/2"TBG,12.6#,13CR80 VAM TOP,.0152 bpf, ID=3.958" --1 8931' It, 4-1/2"TBG, 12.6#,L-80 NSCT.0152 bpf,ID=3.958" H 9019' TOP OF4-1/2"LNR H 9017' ` I 7"LNR,29#,L-80,.0371 bpf, ID=6.184" —{ 91721 • PERFORATION SUMMARY ` REF LOG:JEWELRY LOG ON 07/25/00 i ` ANGLE AT TOP PERF: 41*@ 9740' 4; Note:Refer to Rod uction DB for historical perf data �\�,\, SIZE SPF INTERVAL Opn/Sqz DATE MILLED FASDRILL&FUSHED TO BTM(3/25/06) — 9878' X4%,104 1, 2-7/8" 6 9740-9746 0 02/06/04 �,,�►� N. 2-718" 6 9760-9788 0 02/18111 PBTD H 9883' 4 9762-9770 0 09/21/01 /2-7/8" 2-11/8" 4 9778-9788 0 08/08/00 2-7/8" 4 9778-9788 0 09/21/01 4-1/2"LNR,12.6#,L-80,.0152 bpf,ID=3.953" —{ 9970' 2-118" 4 9832-9850 0 08/08/00 1 .. DATE REV BY COMMENTS DATE REV BY CONIvlENTS PRUDHOE BAY UNIT 11/05/82 ORIGINAL COMPLETION 04/05/07 DAV/PAG XO CORRECTION WELL 06-24A 07/18/00 SIDETRACK(06-24A) 04/07/07 DAV/PAG SAFETY NOTE CORRECTION PEROT No:r2000960 03/16/06 NORDIC2 RWO 02/28/11 SRDVPJC RE PERF(02/18/11) API No: 50-029-20822-01 03/19/06 KEY/TLH DRLG DRAFT CORRECTIONS 09/08/12 MBA/PJC GLV GO(09/06/12) SEC 2,T1ON,R14E,2718.36'FEL&2566.36'FNL 03/25/06 CJA/PJC MLL FASDRILL&PUSH BTM 12/13/12 JMD 4-1/2"LNR DEPTH CORRECTIONS 03/27/06 JRP/PJC GLV C/O BP Exploration(Alaska) - TREE= ' FMC GEN 3 WELLHEAD= PING 0 SAFE' TES:` *4-112"CHROME TBG*** ACTUATOR= AXELSON KB.env= 71' Proposed CTD Stieback BF.8LEV= __ t KQP= ---------2997' I Max Angle- 41 @ 9777' 26' 5-1/2"X 4-1/2"XO,D=3.958" Datum MD= 9573' Datum TVD= 8800'SS I 1 2184' H4-1/2"HES X NIP,ID=3.813" 13-3/8"CSG,72#,L-80,ID=12.347" H 2496' , GAS LET MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1-1 4 3447 3425 22 MMG DOME RK 16 03/27/06 3 6104 5821 27 MMG SO RK 20 03/27/06 2 7766 73MMGW (06-24A)DMY 8137'RK-8155° 0 03/14/06 1 1 8762 8207 35 KGB-2 DMY BK 0 03/14/06 TOP OF 7"CSG — 7'965' MILLOUT28 WIPDO $829' —4-121/2"HES X NIP,ID=3.813" Minimum ID = 3.725" © 8997' 4-1/2" HES XN NIPPLE 8850' —17"X4-1/2"BKR PKR,D=3.870" 8872' H4-1/2"HES X NP,D=3.813" 8930' HTBG STUB(03/03/06) ii 8940' H 7"X 4-1/2"UNIQUE OVERSHOT N1 8964' H7"X 4-1/2"BKR S-3 PKR,D=3.875" IBPH 8160' J C: 8997' —14-112"HES XN NIP,D=3.725" 9018' —14-1/2"VVI_CG,D=3.958" ;: 9020' —ELMD TT LOGGED I I 09/14/009-5/8"CSG,47#,L-80,D=8.681" — 9032' 1901r —7"X4-1/2"BKRZXP LNR PKR,D=5.250" 4-1/2"TBG,12.6#,13CR80 VAM TOP,.0152 bpf,D=3.958" —I 8931' 1 led` ►+ 4-1/2"TBG, 12.6#,L-80 NSCT.0152 bpf,D=3.958" —I 9019' TOP OF4-1/2"LNR -� 9019' 14 2"whstr�ck @ 9,475' 40° Lac ‹..' 1"R0 H S PERFORATION SUMMARY 7"LNR,29#,L-80,.0371 bpf,D=6.184" --I 9172' REF LOp:JEWELRY LOG ON 07/25/00 ANGLE ATTOP PERF: 41 @ 9740' lop of3 12"lnet-and cement@ --9,405' 114b Note:Refer to'Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE / �� 2-7/8" 6 9740-9746 0 02/06/04 �41�\�%, 2-7/8" 6 9760-9788 0 02/18/11 '\fit\��\ii: 2-7/8" 4 9762-9770 0 09/21/01 3-1/4"x2-7/8"X0 @ -10,150' x;;;;11. o. 2-1/8" 4 9778-9788 0 08/08/00 \- 2-7/8" 4 9778-9788 0 09/21/01 3-1/2"x 3 1/4"XC 2-1/8" 4 9832-9850 0 08/08/00 MILLED FASDRLL&PUSHED TO BTM(3/25/06) — 9878' 1655/ PBTD --L 9984- 14-1/2"LNR, 12.6#,L-80, .0152 bpf,D=3.953" —I 9970' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/05/82 ORIGINAL COMPLETION 04/05/07 DAV/PAG XO CORRECTION _ WELL: 06-24A 07/18/00 SIDETRACK(06-24A) 04/07/07 DAV/PAG SAFETY NOTE CORRECTION PERMT No: 2000960 03/16/06 NORDIC2 RWO 02/28/11 SRD✓PJC RE PERF(02/18/11) AR Nb: 50-029-20822-01 03/19/06 KEYITLH DRLG DRAFT CORRECTIONS SEC 2,T1 ON,R14E,2718.36'FEL&2566.36'FM__ 03/25/06 C,JA/PJC MLL FASDRILL&PUSH BTM 03/27/06 JRR/PJC GLV 00 BP Exploration(Alaska) a. r a II .1.: d 22 Ij 9 ° 9 1116:1 °U° III 2 i t8 w n Yfl II O U �•� g ` Id■ —e go s � 3, F P Ja ® - - "7" 1 " ,1o i 9 tuiJ °amga c3 2 2 Q re U r 0° Cv Q g5 HV o4 ° O a 1 U Ili p IIT I � �. J 1 \ 1111 III Z T. 1 "' ® 1111 0 III 3 1 c° I I (i Q � 1 v a "'►• > I Jv Z owMiiii,♦ Ie O ' > n ' �I1 J V O I11 ` 8 Eo U Ill I W LL U U • W ; Q �, FII rF • I11rsL 11 = 111 u LLI ,L I II E -10 E r W p I11 9 a p W 'ii � 9 • 01:40) Ili U (^^ Ce 1 Li .___.__ al r II� -ow fn m> 0I _ 1 v3 1 ZI O tl 1 � ^ S I Iea 21 Z 8 i v Z *C am 1 � 1 111 r 8 I I� I d �] 1■L' Q o u I a` ® 111 1.1 II o , Y 1 3 I I ] � a I 1 ■ o I ;.. ■.. ■ iil ~ I 11, Z f 11=111 Z OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME j l /( C/(r� Z ‘lz PTD# .2- 1 Z- ri Development Service Exploratory Stratigraphic Test Non-Conventional Well �^' FIELD: rr--7.7“..kettA)--e- POOL: ri----tx,(1/4-,0-e— CQ, l Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 To It 0) o a) o- 0 0 a) 0 `o m ID c • Q c)m m a c 0 O 0 o o as Q w• N co a O p L co c p aO a) 0 3 N U m O O O O L = a U .0 0 0_ ° 0 0 0 N 0 -6 — L Lr) a) a) , 3 (� c1 aoi a`) 3 w H .32rn g 0- oco C 115 N C a) m 0 o L C Q .Y > c H c N CO U N N p O N 3 U o 4 oQ co O a W Q H O sc U > 1E- 2 �"' co O 0)E a Z O o — m a 3 0_ M.. a o) CL C N _ > J (Cll 36 N I- .0 CO N cn I r co = C (V a O (O M a N E Q (O CO Ili L -O V O 0 co O 0 0 0 N m C N -o W 0 y a) N D co C O) C V) p E 3 , C 0 M 0 oo m E c a) co 0 0 w 0 N co p 0 CO Q a 0 3 N 112 N Q 0 Ci) o 0 a = c D a) o a H 0 m > Q H 0- o '5 cn a a co J a N a s m w a N Eo ami I '0 — v 0 a a N Q Q 1) L 0) 0) N X .Q >' a 0. aN) a) O a) C CO @ to N N a) N coC ) N N N OUE a) a) O `0 0 0 0 D 0 M m 0 -0 a a) C9 3 = p 0 0 0 .� M m M _ ° N a) 3 a) 3 z O p v 0 0 o 0 x m Z E a) a E co o a) p - n co c t t ao ao L 13 'X X N 0 0 E w w CC O w o cn - 0 o as a N U Q 0_ el U CO U) CD N CC CO a 2 2 I 0 W o_ a > ... w ( a Q < < aa)) a a)) a a)) a) a) a a)) a) a) a) a) a a)) a) < < < < < < < a) a) aa)) a) aa)) < c) a) aa)) a)) a) a) < 0 (D < < < n► a) Z Z >- >- >- >- >- >- >- >- >- >- >- >- Z z z Z Z z Z >- >- >- >- >- Z >- >- >- >- >- >- Z z >- z z z Al H m "� cn U- is _ 0 -` 0 v U cn o To c — • 0 a) E E 3 — E o O 0 O '` c co It O o.5 ...._0_ ›... (,) _ w. _`..b C L O LS() it 0 c N >. 0 v -00� 3 E 3 O O O M C 0 0 _ U C 0 — E `° J C as a N E p o _... 0 0o Q a) a)0 O u) m `O O O O N Q 0 N a @ 'E O o 0 Q (0 0 LL co x C 0 a) 0 ? O O T C O C C. .o N !n. N co < 0 O- L a cn v) C a) o) V' a) n ihill 06 0 , m a0) o w ami t Q >,OJ c O. V) 0 7 CO L C N a) C > N o 3 o N o a a - 3o a -o 0 CO Z o = L 0) 0 in cp 7 3 p ac co us c N 5 '� o ,c j < co C./) a.)a) 0 0) W — a o C a O a) C a3 0 a D O C a1 m, 0 O 0) 0 �' L C C 0. C. O' .. 0 C L0 CO > U > a Q a) n C o o rn o O= Y o o a` .S 0 m - 3 0 N ~ .. 0 a o� c o °) w rn aQi w o n c 0 p U Q a) w e a 0 a) �' N o 0 0 0 °c) U n o a 3 > Y o 'y Q o —°0 0 0 > o ° a a) @ CO o 0 0 0 CO 0 E c .@ 0 Q m - N o o) 0 0 c N a' J E Q 0 0 0 .0 _0 o o a) c o a Z o ,., E 3 a) o a) _c m 3 ,=.. a) E a Q E C C a �0 m m co a a :? L L -moo as c0 -0 ate) a) 2 E c 0 ca co as .N r a) o to o Q 3 0 .c o > 3 c)E o Z o 0 o cn — 0 3 3 a) „,ca a) .. -o w 'v 2 3 a) O O a 0 0 Q °) 0 0 3 w C a) o w o a s c 0 a > '> U o o v 0 0 a n 2, 0 0 -,C) Z 0 ao O c O C • o > O 0 n "'0 a o `a) o O O o O c 0 o cn a a) o rn c a Q n 0 0 a m a) m 0 0 o E O E L o 0 C H O 0 Q 0 a a) a) 0 �_ ° 0 0 a c Q o 0 a) Y a 0 ,- a) -o mo) o (n w. 3 c o -- o V Q L Q Q Q Q cn w Q a CL N U 0 E a) O O 0 — Q N N N .- 'E o) O- a) CO CO @ o) a) O 0 0) E C U 3 I p U) p CO L @ (-7,-.)- CO a3 ,_ C o) 7 7 N a) 0 L O 0 a 4-,.., C a 'Cn Q O O m �° c a a a 0 u)CD s 2 as Os CD >, w o a L (I) n c 0 0 > rn c L a) 8- o N 0 0 > c E w a C 0 E a) a) a) a) CO o co C C -.. a) 3 0 c°0 m o 0 a) - - 3 00 0i c o c0) m c o) m f" W C w C 3 O U U o o U UE 0 d) , 0 a) o o — a f0 -o co „ N a E — C E 0 U a) 'OUO C CO a o -- 0 0 0 0 0 .� 5 m m 0- 0 0 a o > > 3 0) 6 a) a 0 c) w w i Y I .mc -- Q E Q 0 ai Y > o 0 'E a) a) a) c -0 00 0. a`) a`) no 0 3 o c al 2 2 2 m -00 a) -00 `o E O O .� O 0 a0) a) co Ecoa) a) o a) 0 z a J D 5 5 5 cn . 0 0 a a U 5 Q a 00) C.) 000 < ' Q o CO CO U 5 — 2 a 0 v) CO U a I Q O N M V co o N O) O N M V CO O r 00 C)) O N M A l0 O h 00 O) 2 E N co V co O r CO O) r- N N N N N N N N N N M M M M M M M M M M U N N N i. O O O a) 2 O c N d N a) N U O OILI m O W +„# '- Q 0 c `O W O Q o 0 W. H "8 Q (/) C > (I) < (/)