Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-195
Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 06/01/2023 Mr. Mel Rixse Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 6/1/2023. Dear Mr. Rixse, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 6/1/2023. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Hilcorp North Slope LLC.Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-offReport of Sundry Operations (10-404)06/01/2023Well NamePTD #API #Initial top of cement (ft)Vol. of cement pumped (gal)Final top of cement (ft)Cement top off date Corrosion inhibitor (gal)Corrosion inhibitor/ sealant dateL-2072210815002923702003.371.31/23/2023123/1/2023L-2312230105002923746003.003.0-393/27/2023M-111810575002920589002.602.6-105/29/2023M-311920325002922256001.501.5-165/29/2023M-331941165002922504001.301.3-145/29/2023N-171830095002920898001.201.2-115/30/2023N-18A2081755002920906010.500.5-65/30/2023N-21A1961965002921342011.001.0-85/30/2023N-272071045002923365000.500.5-45/30/2023N-292141105002923521002.302.3-245/30/2023N-31215175500292356000-0--205/30/2023V-2342220045002923707006.3210.91/23/2023243/1/2023W-2412221545002923741002.502.5-263/1/2023Z-121891025002921977000.700.7-45/23/2023Z-34212061500292346900-0--155/27/2023Z-402111735002923462000.700.7-65/27/2023Z-46A2052035002923280010.500.5-35/23/2023Z-502120015002923463000.500.5-35/27/2023Z-662121955002923482000.700.7-85/27/2023Z-116211124500292345500-0--175/27/2023Z-210204181500292322600-0--125/27/2023Z-2292221045002923726003.8361.23/5/2023363/27/20230.700.7-5/27/2023Z-662121955002923482008 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by directinspection of the file. al a - I Well History File Identifier Organizing (done) Two-sided ❑ Rescan Needed RESCAN: OVERSIZED: NOTES: Color Items: ❑ Maps: Grayscale Items: gs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Maria Date: 1415". /s/ 6/1 e Project Proofing BY: Ai= Date: 1 /3)15' isl Scanning Preparation x 30 = q 0 + a3 = TOTAL PAGES IP (Count does not include cover sheet) BY: at Date: ` 13 f /s/ Production Scanning Stage 1 Page Count from Scanned File: ) I I+ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Date: 1// 3) i 5- /s/ r14 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: 10 NO TOTAL PAGES: 2� Digital version appended by: Meredith Michal ME Date: 0) t /!s— isi Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: 13 7 Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc .1- 0 ' O O N 9 I I 0 0 OZ N M M N N O O 1 Z t L .c L y r Y o - w o ( > •g•r •g cv Q v vZ co a x vi w 0 O1 0 102 5 N N O Cr >. T C C J m .P- • w T N• 5 ca U a) N a) a) OOOOa7 d y a) in CO CO CL CZ N () ) >+ ›• N in 1 0 o a • a ao o0- cn v)0- To To 2 2 2cOv O [— Z c a) J O O 3 O O� it w fn co 0 m ca >� 5.°� F. 1 T 4? N co co 0 fo V (o a) (n-p (n co u) a. c c Q a) :4 N •- '00 Q c c U m w >a >o > d >o Q Q it it m iii a o a� O 2 I� -N co co 0) O 2 co 0) co 2 co co co co W co U co .0 c0 a�0 '4 c4_1 c4 c4 c c4 v (4 `4 c4 C4 0 a) Z c4 a� co v Si `) 0 CL 0 Z, N N y N a) Na, N a) N N N N M 0 N N-op U Q' Q o C j N o 6 N 0 N 0 0 N 0 N N N N 0 a) N p N O ? o m a 0 aa) LL ii g ii a2i ii 2 ii y ii ii Li. u_ cc 0 it E. is= aa)) C) a E c.)g c� c)-O c) c�-o c� c) v a- c)w u 0 EX E E E 'E a) 'E c a) 'c c 'c 'c 'c O c. c N w 0) O L o 0 o o v o Q) o-C:3 o O O O O O O O CO I— J U C U Z U U V UQ U V IT. O U U U U Q Ti.„,u) UN Ur J ca a) a) a) a) a a) a) a) N a) 4) a a) _w a) a) N N v Le > N Q Eo 2 W co W w fY W 1- W Ce w f- w w w W N 2 w CZ W,- W O Z w m •• 0" 0- r ,e is ... •.-- a A& 0 O V 1 C y;M M M M _M M M _M M_ M _M _M M_ M_ ^ li Y > O O O O O O O O O O O O O O ca •O N N N N N N N N N N N N N N LU 01n o 0 0 0 0 0 0 0 0 0 in .- .-- CB' .�-- o m y N co co co co co co co co co co Ce Jd U coIX cl') to to Cr) c!) Cr) to to i0 W o 0 X c LU w = I 2 21 a C) CO 0 V) 0 C.)10 Z c- / � W o co Q la O CO M O no I. 7 la M co N _I e 0 o � I /—0 • O N li N � W l 0 N 0 N O N a dZ co E a w V U m 0 C 4. o > c oJ — Lu I CZ ZI Q CO I Z ! a a `° _ H I w O O II E J 2; C m >- (o9 4) CO QN . O O m f`') p J fn 1 O cu O 0 ' co m C w Q CC o CL o il H ofce Q c Ci a) Z lQ , Z 0 c 0 T c E . 2 co co 40 Z = 2 co co co co co CO ca CO CO ca N CO CO CO a) 0) c m m co co co co co m i6 a- -0 Ti a- m 3 co C E O 0 0 0 0 0 0 0 0 0 0 m 0 0 0 a) Ao CC Z u Tiv. w° w w :° co co .- w co _ :° :° :° y N 'p) '0) p) 'p) 'o) p) a) 'm 'p) 'o) O 'O) p) p) 0 0 z C ` 00 00 0 0 0 0 0 0 0 _J 0 0 0 b O J o 0 co ja CD CCDD CO CO CDDcD co CCD CD CD cO cD cO o 0 O a) 1N Q Z L C d A E M M M C') M v.) M M M M f07 el N M N 2 0 0 O w O Z NNN N N N N N N N N N N N r U < E_ E u- € E . ocow QLi. 0 c G 01Q U '••' w z d1 0) 2 1O 0 00 0 0 0 0 0 0 0 0 0 0 0 a y e 0 O l u) 1- o. =y - a00 00 0 0 0 0 0 0 0 0 0 0 0 CL 2 I L < 3 0 cu;w W W W W W W W W W LU LU w w o p > O NC X co - 0 0 0 _U _ .p N )O LO v y w w p 2• 2 2 . 5 ' N co Z w w > T >. ,C C J Z O L t L L X N miu5 MI c �� -> o o O v v v o a Q ma cDN N 2 2 a a m CO— 0 c c c D X p c4 Q ccj ,,w .y .N > > i. T a co 5 2 N N CO CO >. >. •c ••c -) N N a a 4 '!1cca CL ELa m m 2 2 `4 u c.) C.)cp u 2 2 a aD (9 DIw D2 me Z J Z a z J u ii cn co N aN 2) a2) aa)i-o a) a2)v co co (1) y ._ Cl.c a.o Z O o o O-op a co CO c j E z z Z o Z Z 0• LI- ii uo u) D E'7- E c F. �g a) >2 Q Q ii LL } co y O N p 0 -. OJ a s m m } �� �.o 'O 1- < N 16 <o= co-p to a) (o•p fo a) C c < o N 7 a mcs am i , 5 >cl- 5 > a 5 L.T. LE m it i oa ai a a a a a CD 2 a co v co Co Co (.0 'ca cD= Co 0) Co 2 co O) co 2 co co co Co W - I c4 o c0'o cD O c4 `4 `4 '4 0 a)0 co w cD o cD O co cD (D N y N-Oo N 8 N N N N 2 u) 2, N ca. N 0 N ate) N 0 N ate) N N N N 02 co o co al U pi NCC N O N rt N N N N Oj W O N EO N 0 N 0 N-O N, N a) a) a) Oj o DO 0=O ? LL it N it LL LL LL LL 0 LL 0 LL LL LL it it LL LL LL 0 co 0 co . N c2 a u a u c) o o c) a c.) 2= c.)v c)a u-o 0 a cv v c) c) a w 0 1 9 1 • o i'c 0 'c 0 'c 0 'c 'c 'c 'c o a •c c N c a) 'c c a) 'c c 'c 'c 'c O a C.- 'c v N O O 2 O O O O O L WQ O 8 O O a O 2 O-2 o 2 O O O O m WQ O N L.°N I— Q co i�L L i-,L u u i� Q i�-2 i� c it 8 i�p t 8 i�p i� u i� S Q u 1.t J a) U 1" N 0 a) a) N a) N_ W N 4) a) 6 a) o a)>> a) o a) a) a) N a) N W d 5, a7 Q E. W E W e %c W W W W N 2 L.u, W 0 W a' W F- W a W W W W W N 2 WW 0 Z y .r I A r .f i A I ♦ �y • O O M M M M M CO M / M M M M M M M M M M , CL P p 0 0 0 o 0 0 0 / 0 0 0 0 0 o 0 0 0 0 0 - W N N N NNNN N N N N N N N N N N N N LO LO LO LO En Lo Lo NI- Ce 0 !00 00 00 00 OD CO 00 00 00 00 00 00 CZ 00 00 a0 CZ M M a W W V m of Z 8 — I Q Yco j O COco O CO M J a) ' 0. Via ' CL O co n co C P O o n O rn rn N o. o N cr.) co O Ts V � U o J I N co Q toa E.' N I- E M Z 0 W m COCV ♦p O a) ' �n D p C• 47, L a) < c a Zo o O U N co E c m a7U z u) co = N a) co co co a) a) N CO CO co ca cc co ca a) CO N N ca ca a) fa laCO N a) a) CO v co ca ca co ca co co a) CO CO V a) ca 3 co I0 0 0 0 0 0 0 c3 0 0 0 0 0 0 0 0 0 0 2 0 0 o) m m m m m m m 2 co COCOco m CO co m co m 2 CO m co w w .. .. .. w . _6) Dorn o) rn o) a a rn o) Dorn rn a o) _rn 5) 5) 5) 6) 0) _o) o) G 0 0 0 0 0 0 0 0 J 0 0 0 0 0 0 0 0 0 0 J 0 0 O O_ _O O o O co O , ,- .- N N N N N N N N N CO" N N N co" N N N N N Co co N CO CO CO CO CO CO CO CO CO co co co co co co co co co co N N (N N N N N N N N N N N N N N N N N N N N '- m D OU yp 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u y 0 0 0 0 0000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d W W W W W LU W J W W W W W W W LU LU 111 J 111 W o ,. o o 4 N � 5 0) . S , S . 5 , S . S , S . S . S N I C) • C) C) U) C Cl) C) Cl) C) cocococ) Cl) 7) UM coCCD• o I� 15 v a N e ZCQ (9ap (9QQ (9QQQ Q QQ °(9Ui v; y ( mn (9n9 N9No0 N N a N -1 N N aN aN aN N N N N N ci N HD I< O' CO I ._ I _ I _ I _ I ._ I ._ I I ._ o p = m 0 m a) c -p C c o N m o m o m o m o m o m m CO o 01 as a»= m a �"= �� a ma_ ma_ ma_ a s a s a s a s 0- 2 p 7 � " I H c c c c c c c c F. y o ui a cn cn cn Z o o o o o o y o o Z E ❑ E .0 E ) E i) E %) E u E i) E t E i) m mo m 7 m 7 m 7 m 7 co 7 m 7 m 7 m 7 c = c a mg (0 c o c v c v c v c -o c v c v c v Q m o m w cQ Q m o m o m o m o a) o d o d o m 2 iia it-0 N1w N1w N1- m ii: a it a ii a ii: air. a u m ii mit a 1 _ o DE m ° D o W c‘iI _ I _ I _ I - I - I _ I I N c N a MM MM MM O N co O) co N co N M N M N M N M O) M J U) 3 N I a c a c a c 2 V) o N N U) (0 U) CO Cr) N U) v U) n CO V o m o m a o 0 o p co 0 m o m O m O co ,- co - co ,- co N mo mo p m c m c m c m c m c m c m c m c Z 00 00 Em LL = LL = w 0 0 ❑ 0 ❑ 0 ❑ 0 ❑ 0 ❑ 0 0 0 ❑ o Y 22 U U U▪ m U VIU V1V O .V O .V O aV l .0 C« U U m m m .V .115 I0a a a Sw 0.) ocn ocn (r) ioion o n N ;goo0 oIoIo1capo I I Io Io I I I 1 Q !uN N .cr . 15<1 Q v <* t � v <7" v � v Ni- v � v � v� U ) m ° m WO WO O NW 20 0m_ 02o 02 _ 02 7 m_ m0 22.1,- cc Q t ;W-, W 7 WN WN WN N2 W-)N W )N W-)N W-)N W-,N W-)N W-1N W-)N O Z a t" I V • I - 4 I V ` •r Nr v. O O O O / O O O O O O O O W N N N N NO N Nnr N N N N N N Ce 0 J co M M co r) co co co co co ch co co a W w 0 m o Z o v a) Ono n co v N 03 COr. o m co C rnO O O O O O O O O O G o m a) rn O N p. eo E V , U c co JM Q CDct c) H N Z c Z o N COco CO M n Lu O a) CO = m • CD Q a ......) Q C a ZE w d U c E m Z i _ m m m m m y m m m m m m m m m m m m m m -o m m m m m m m m • c ;❑ ❑ p ❑ ❑ ami p ❑ ❑ ❑ ❑ p ❑ ❑ a) m m m m m 2 m m m m m m m m ❑ ❑ O ❑ ❑ ❑ _1 ❑ ❑ ❑ ❑ p p ❑ ❑ o co co �pco g) ami co �i ori of co N �co co co co ch co M co co co co co co co N N N N N N N N N N N N N N N co I ❑ a0 O c C U U U U U U U U U U U U U U U p ❑ ❑ ❑ ❑ p o ❑ ❑ p ❑ ❑ ❑ p ❑ Q a 2 W w W W W -J w W W W w W W W o 9o U) U) Cl) I N J ® ® 1 N ✓ Z (I N �1 < CC01 D d Q. } } l .. M N < Q < -- "� , `4 , `Q D a) N T o) U N a) N a> N a� a) 0 9 5 01 .o O1 0 O1 o w 3 - > b N d n- d CL d CL N a c0 N 0 N C 7 ai o ai o ai o ?U ?(6 co N o c _ • m < ! F- p E .0 E t E t 7"1- ch d M a a o Z' zIc ' 12I2 I2 Ud Q • co -0 co v0NOOm o d O d o aa) a) I LL a. it ct "r 1 1NIao NI NI NI DO : o mOo o J J N M O coM - M E .- m CCL QO d 1 5 I O N CO N CO CO • O O O Z .- 1 co c f0 C N C N U Q1 U 2_ U W O 0 O 0 o LL o it'=O LL c � N V O U O .V A V O .V O .V O a) Z Z c c c oa oa oa E bb 1� y I 12I I I I E i } } } u)_ v-92 c p c V t c o 'p c) V O m Ce Q c W-)N W n N W -)N W N W N W0.1 U O O z t T f® 0 •O CL O U v v v v 0 v ay co 0 0 0 0 0 o Eve °) 0 LU g v 0.1 v CV v CNI CV CN v v v ea 3 rn Z b ui o IX/y O CO M M CO Cl) M N co 0. LL E W W • N CO II V 0. m 0 d Jco Z dCL ui .2. Un QN- cv 0 0 O N (0Sc0 J O cf W o v E w J 0 c 2 0 0 CL Co 0 a o Cl) I O N a CSN o C c w V > 0 i E Q m o o O co U w E II N o € 1 Z M I _ N _p N co O co C Z' O y O Ca CS a N .. a) E m M C O ~ A = co I D c c O 0 I Q RI a o l C• .0 a Q Z a o ° E T 0Ell 0 E 0 o 2 0 co z11 I 07 co �0 co O LO M 3 co O 0 0 0 0 0 c N O co I O I O CO COCO TO CO 0 Z (/^�-v Cr) co •O) O) an O) _O O) c0 } v l N C 0 0 0 0 0 0 0 € 0 ] Co CO 1 cl 8 V C >ii, V► CO CLQ I FA U el w E a 0 r (N co N N N cco co N N W w O N N a O LY O C H it = iii i E E z aa) y 1 W c CD ' N CO 1 0 w H ... 10 0 ?i c M O y Q o o a o co r I U U 0 0 U U U o J a) •°' i E - o a 0 � � a � H 8 0 0 0 0 0 0 0 J tL o 2 ao) I O o E) m I 0 � ,w w w w w w 3 z 0 a 0 0 0 , O o 0 O N csi co N CO O , N c el N Z CO el U N c; N 5 i Z b o I Fs- o o I z a a J U O Qz m 0o � i•-• J 'z' • CI a E N 0 O U CL P w o Ce a UJ w J o O. m Q Z 8 a Y N J a m C O u)G O a) O Na CD E ✓ U o Q L a. m r N M 5— • o 2 N W Q N 01 ''=A0 a.) V+ I Q 0 Q ccO I— a) • a) Q o a Z E ►- Q d 0 1_ E fa z m ao 3 c �1 w 11 0 0 c N 3 N I d j a) coco • cn I•l V ✓ r Cto U d I E E a E E 0 o i o 2.St 3Q, WELL LOG TRANSMITTAL DATA LOGGED VZiq/2o1y K BENDER To: Alaska Oil and Gas Conservation Comm. November 26, 2014 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 r RE: Production Profile: Z-66 Run Date: 1/30/2014 A 014 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline&Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 Z-66 Digital Log file, Interpretation Report 1 CD Rom 50-029-23482-00 Production Profile (Field Print) 1 Color Log 50-029-23482-00 Production Profile Report (Interpretation Report) 1 Report 50-029-23482-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: • Halliburton Wireline&Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS ANC@halliburton.corn Date: Signed: (4tiza-ftek-il) 6-41446t 2_.V2-4) WELL LOG 114STRANSMITTAL PROACTIVE DINSERVICES, INC. DATA LOGGED Aq� 3iy /2014 M K BENDER To: AOGCC Makana Bender RECEIVED 333 W. 7th Ave Suite 100 Anchorage,Alaska 99501 MAR 0 4 2014 [907) 793-1225 AOGCC RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Sarah Gunkel LR2 - 1 900 Benson Blvd. Anchorage,AK 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage,AK 99518 Fax: (907) 245-8952 1) Production Profile-MAPS 31-Jan-14 Z-66 BL/ CO 50-029-23482-00 2) Signed : Date : -S/44/,4‘ Print Name: -Z31 'b . PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGEOMEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D\Archives\MasterTemplateFtles\Templates\Distnbunon\Transm ttalSheets\BP_Transmit docx 2\2-- kc) 5 DATAOGGED 2:6°1.•�ViM2013 .M K BENDER Schiumberger RECEIVED Drilling & Measurements AUG 1 5 2013 MWD/LWD Log Product Delivery AOGCC Customer BP Exploration Alaska Inc Dispatched To: Makana Bender Well No Z-66 Date Dispatched: 14-Aug-13 Installation/Rig DOYON 25 Dispatched By: STEPHANIE PACILLO Data Survey No Of Prints No of CDs Z-66 Log 1 1 2 in MD 1 2 in TVD 1 5 in MD 1 5inTVD 1 Received By: Please sign and return one copyto: Drilling&Measurements 2525 Gambell Street,Suite 400 Anchorage,Alaska 99503 hecheto@slb.com Hector Echeto Fax 907-561-8317 TRANSMITTAL#:6401 DA `A LOGGED - ! /1,0/2013 M K BENDER 2?620 Schiumberger RECEIVED AUG 15 Drilling & Measurements MWD/LWD Log Product Delivery AA OGCC Customer BP Exploration Alaska Inc Dispatched To: Makana Bender Well No Z-66 PB1 Date Dispatched: 14-Aug-13 Installation/Rig DOYON 25 Dispatched By: STEPHANIE PACILLO Data Survey No Of Prints No of CDs Z-66 PB1 Log 1 1 2 in MD 1 2 In TVD 1 5inMD 1 5 In TVD 1 Received By: rn Please sign and return one copyto: Drilling&Measurements 2525 Gambell Street,Suite 400 Anchorage,Alaska 99503 hecheto@slb.com Hector Echeto Fax 907-561-8317 TRANSMITTAL#:6401 U_n, a- N OGrnrnrn O i U4 4OO4W iNpd OrNa d0MNEr7 NW2 NmpWh OWWr 7W22 0 en 0 MhM NNNN0)On Eigp VNQ.O ENN NOn NNNM OWNN Nt. Q QQN00) WWW0) rnrnrnrn rnrnrnrnrn rnrnrnrnm rnrnrnrnrn rnrnrnrnrnrn0rn0rn „, m..,m0rnmrn Rd N eg2M4 M244M 4224e e4422 24224 42442 4MM44 QeQe a V ""nM ^NNNN80000 03464 MN204 nOaNn HNrDO ONaN ems A14V NaWnWpOppI REM r3rRa OWErWUPI: ":=813 FiRO N -C- q Wda NNu NNZZV n0O0 NoO )0(rG N(2rC 0 00NNmOn3 UJ ( ^4 J nrynn,n nnnrn ,,,rr rnrnr nrrrr rrrnn nnnnr rr,n NNN NqqggNNN2N NNNNN NNNNN NNNNN NNNNN NNNN O 00000 OOOOO OOCOO OOOGO OGOOO OOOOC CGCGC OGOC rrrrr ,AAAA rrrrr rrrrrrrrrr ,AAAA AAAA, AAAA Ci 0 m LIJ -tCWN.84V NVOOE NNWIrE 444V2 MgA0. NVO344 VNOA8 4v�A 01NW0W 8 22§8 S414E ;LISA .',,, gtmWct M5W NNNrnrnrnrnrn rnrnrnrnrn rnrnrnrnrn rnrnrnrnN rnrnrn WWrn rnrnrnrn 220NN 222MM NNNNN NNNNN NNNNN NNNNN NNNNN NNNN CN���Om 24128 820'1132 8XO-528 4OEEf7 Nm�m< V8282 Vr3N1W00 Mr2iiMmg Em m valii Z NNENN EM MNN NNN NNNNN NNE NNNN J ONV WVV2o (OQN EE 4r2:2713 OEQQh rhOIrO mmO N .ZOOON OM,-OO ONNMN NI-OO1- 0M0MA- NN00, NI-•-N,- ONO°=c888:1',9 ppONpp) 88:2 t34,944 :14;271 22P.2 asE,FN rnOmN 66666 6"" t4N0nQo7N2VN7rN NMmqN(ONfj 00000 0) pp ONOQV 8844'7- E }0 ) 222VN r0VrO 00N.0Z0007 NNa YYNA w.: 20OMgv:, , gWOOC MWNAW . . . . . . . . . . . . . . . , c? NN T J O N OD Q �CC CO CO M d fdJpW0M r0000 mNENn hOEEfrD 020NNMNEON WNNtrN Nbrl�WNCOO VtOiNLyNrNg 9C '6"“=”- "—ON0) NpNA O50pQ WpN NNEaeVNOY EOAA O li:40•111,111,---millil EoC0eM' m N EmO2620d$ n Q MECONmNrrWLLmHGNGBOppSNn 8E8rnm QNmNm n420r 200 00 282P.88Nm ANmO40000. c61-:66OC t 7Gr-aa T1:4ff., OO,,,,N NMrnWO44ClN NaN 0Y ‘-NM ONWrW MN-W.4.0WrnONQ WNWW r NN .MMM; reNNrnM rrN- Z t ` .. r s E2 c d O O m 5 f m^$ D 21OOWC rnICZCD L VOOddcdLL drn w=O ON rWNN,rn s12. WN2M 4t" $ 0M1-N NWEMW R0'01,51 N o 0 211 gfp]rn8 V > O N- N .4.4vv N2E$ 0 234Ne ( NMqNAA .-NWS I. duUldGiCiCceV d O 7 >Eu>> AAor.' O N>>. ioofOfUgJ N 7X00pp0 NMN0 NNNp 0280a0VA �MAeN r00mI�NN ` Q fOgH MVMN MEI NVh0E M0)8&0 W0n-1 AN000 "3E v NNN NNNN 3C N00W- NpqQ� NlrOr)iAW ENMOM � ry2 WWV N W8:- Nom1pWpE p001.2 NNN,R VYr2W,E zey, O N mLLn2200o OppnMV ENmON AMNWNO2Nn� W"nNO R427..8 'V''888P0C WOOW ' 8EyRN NNN ♦NN oNNN pNNNN NmmNNNe E N NN M ° �oE o0� 7Aw yNa 8MNO C0pp0W0 .rWMr ppOMr0 WWNQN 8yVWr-aV MWQ � e 0W p00'} 0 0WO0N fMW0000O102 0N00 N2.pW!- 0O00 '(G(G 0CNN NN1rNMMN-M22 M?OdNAmR ZoF 2 5W M ap OWIZI 00NN0ZZa X02000 NSS23 Ve433 p8VS2 84.A24. QAOnN NW02,3EEN2 OM2N (0)% O NNOO 0r2W ppWNN 0E o NNN0N NNNN w o C y W- EN0> d .. i,3-, Ft 0 M W . Ga—vGLL it: i! .02270o A C O t C 9 t d a d N 9 a W E d m g_m 7 O 0) d 0§ > >O $ O O 0 C O F K d'C)ILN3m�NNHUJJU U' U d'� F Ln r E 2 pp5N V ing 222" 0 2 0 2 2'W W 2420 42O pOyy; Er ppr 02 !HOO2 M k EpO Cr 12Rn0EEREE EN0p � NSV.2y41NNggggE D 000 0000 OOONO NOOO OOOOO OOO OO NN NtODa J NNNNN NNNNN NNNNN NNNNN aN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0 4 4 4 0 01 4 0 4 4 4 4 4 4 4 4 4 4 0 0 4 4 4 4 4 4 0 4 4 4 4 4 4 4 4 4 4 4 4 0 0 01 0 4 0 01 4 4 4 4 4 4 4 4 4 4 4 4 of 4 a 44444 44444 44444 44444 44444 44444 44444 44444 44444 44444 44444 4444 ii o I IPJ y4 HPJ m200O2E2 PJJ HPJ mgO � S7p2^ a 2"2 "2" NPJ 0p000 0 40020 00N abNNb NiVO 4444 NN NoNNN N2222 22222 22222 22222 22222 2 mNM ✓ nnnnn nnnnn 44444 rrrrn 44444 44444 nnnnn 66666 66666 AAAA 44444 AAAA 2yy77.4p�O r nN yy 0yy ra 4 N1 n0 MN 0 N44M'44 rav N0 20 0 24044C00 (00 '.,‘17NM 7Ma40 ,�100/, v2 .04P,2t.14g2 482g2 0pg2 §2S8am2104 4g4Sp244g4 742g2 2244 W 0 gQ0010442 2222A AWDyM42222 ,4444 4,444 4444 42E22 24442 2222 N .N0M0 NNNNN ONNNN 002200400ESEMN NNNNN NNNNN NNNNN 0O020N01J0 M 02 ST Peg 3.2 g,yy 4 A S 444 4842,7 2A 4a ta2.4gp 4,44,%2 4000 4240 402000 pT 4324144 4'8244 4.224 OMD 8242 Cn 04 fNfppN 10 j� 21004 NNNNN `000 W M W r,2D2 C V t")t`') Npq {Np Tp W r(t00 q IN00Ny 2147400 mn2 V • N .222 M OD M N 028222 22222 44444 44444 44444 ED M END 2 t0 22 22 22022 ND2 M OD22 ��� � 2 8222 22222 22222 2222 22222 22222 2222 22222 2222 (0 yN mil N N0 N 0{0y 100 MEM 0 0110000 0 00000 000 00 14a0010010 010000 004 01010 0010 N 0 0401010 0 000 0 J 1O '0NEDN 0.02001 p9,9 ty,.., 4 i0 400 a4 00NMM Or W�� 2 W 000 00220 V 01D H0JMM 200214 O O G� r �O O O O M� 1440 4 1NN`2 0 2 0 0 4 f0C HRH M If) 4 OD a tV fD a lh th A .1 O p N 4(2y�Ty�t Op�UJ OD 1pN0 O�1�ry0p 1 Ap t{tNp07 V 10 r O 4 h 1n C 4 4 ED try 4 W 1N{05 Y I ^ ^i O E O 6 N N N M t4� M p V V E 2 fe0 r n T T 01 N N N NNN N R N R N N N N N '"1"1“1"?OCO?M M t 7 P'J t7 t7 t? =CN 40Gn rTn8“; O7 SL1 g14.7 ;t1-2,7,F0 °2 2N 02420040Nt 44t�J Pl.til 1, Q Ot? l • g4 01-TD W;;Mg NOypN aNTpt 0qq qN NNN N , T,M v ar 1A AI 00 CM 2424S8 NM00 42444 284X2 24444 0002 N 24484 etz2T02442:: 44242 444 O 443A "All OO N0p40aO0 0. .WN 0pN NpppcENtp402NOV _ 4M7 ` NNNN ONN NN (4 a AW O 1 1 1N0 p1 t a O CN A0224 N444 44244 2442 N432:2 g.2400 44224 24'.224 • 04424 A344 0004 p 4002 NM“a 4O222r “ 4N0NN HEAR N244 NAm4W 2000M ' NNN 3 C 2 2 44 2y 4 44y V F14 40a M0 000�O 22444TN0004atttppp2 OnA42 025 2 0mNOMM rOAT,;2 ,2Az mm 5 Wir0 040tM 4404001 &°022048O001p00 00n4 g5CN" vv W`R 4 O 4 00 2 p V 40 S. OO (tyV 10 aa 22 pG pp po {{pp�p p 2 pp{�y O V a p c* ",2.. 420(0 Z?Pi VM2.4 4 r 8ggg ON 140010 0�N� Mil D� k2. 120 002 pep2$ 0p��p4n4� INN4ON O .74000Mi M4N00 N HI MEI NNNMl7 MMn1M M Mil 12.J th t+f iM V 4Ipy!p 44244 4 eNN140 Mil Mil i0 0NM p2 . O^�-N t 7 0 l O r � 10 0 0 0 010 0 2 f D ft3i f D 2 14101 O1�0 pn1 tO 140 N;G2Dl;1t001 tt+NOJ my W r,2 '61484.” rN20 Va0 P4'" OD C4Dr2a8 '1,312 124 PIP 041 t2p 014 PD'I0 V M!OQDJ<�CO c“S Wre 22 4v22 1p 014001 N 0,NM0,A 0,Nt+J 0,4 0400,NNrcl;N Nt01 th t2�fg 4g4A tLA MM04)t4+J2 0Oe e4 Y Oe Oe 4 O0N ON 4002 04422 t0004t20 Av 0 0 0 48 2 4 2 A 27424 00422 N O 2 6-A4,71 8 8 n24442 4442 4222 0 $4.742 2 g 2 4 2 24'6'44 4'6VO 0 2 2 0 2 20442 22222 22022 NN22 44422 222Ab 040ypNpNNpyNNNE N NNNNN NNNNN NNNNN NNN NNNN NNNNN NNNN NN NNNN NVN NN NNNN C '.2NeTN 24242 24:1-22 24,244 2N4 28Tm4 2444 2242V 44242 4244e 2, 4g2 4`'p 0,7 TN2N 4 44;44 e4;e4 0;44; 4,)444 t.,A1MO4 08a42 NNNN N N NNN N N NNNN NNNN N NNNN 02N:I..1 28424 4g2.12 s.320 00 4-004 T R A'a SS802 0 N 44 2O2 �7 F2g 4,1,42g 4494 qp48 S'4442 8EI svJOA m. 44 0p 22 N NN444 422g4 2A2 24 424;4 44<Qv eeepg NA 418c 430 84z2,4 Arin"A 00 00 CD Nm U 8 0 u 0 U, JC MNe NNvNONvNNvNNaMM vytNNv7 NNvVNNvryVNNvYMMe • N� ' o p M2.;.1 SWAO NNO_ 1 OWEERriORF. Mil ,EH OE WIlW;M Q 2O ,ms WN0N NN Nv • NNN ° 1114 0. NN HIM Vr 7 .7as a as as v s 7 eCa�7 2 a. q N om aas th cpm EDmv m m mth orVV n EWE a� W mp mna(mpr Vi Qpnpn MDR mf(��j re.- RRpp n M 9 W W O2FyE' th a mtyhNm mOm�m N H, EpE E ppf m'r lh ' Mn rm$V O MfWOA Nm 11 MN lAn gJ' N rNOOS 20'34'02. 22Ej yA pN M(Ny�Nr NtpNO SN NN m ANN mm S ANNA.S Omm W n m mm M inn (h tDNmm N ggN2N ggg. O m W ggN N40{m W NAAm rp aAA ymm Np yy aq Og yq pm pg I MMg. W th W NN gMfgg m m m m m m m m m m m m m m m m m m m m m m N Ol N N N N N N OI. .N N N N N N N N M N N N N N N N N M N N N N N N N N N N M N N N N M N N N N M N N N N M N f V l V ttt VVV 0 0'0'00'0'00 10'00000000 00000 00000 0000AI 00000 10.000E 00000 00000 00000 0000'0 '00000 EA m�fAmhh Cs/ CmN ppNNM NNMNN 22248 222N2 84442NrOrOaitlimEm 52r24. 28m42 84288 OOOWN " . .- ga!ggg QAggINMMMMa 3 NNN SOSNN MMMMNV,2222222 2.223 0M0MO 0OsOT NOM NNNN m mmWM Lids mmmmmmmmmmmWmWpOmmmmm mWmmm mmmmm CoS 2205 OIpONN A8842 DVWpN NOAaW OpNFr 2244-N ra422 22P42 422 2144oMN5 ?C‘; On " OVNmmOM OOOOWWVM WMMVOW" OWng h m. hNN5,4E5 AAA W mWnnn m mmmmm mmmmm `VENN'S mmmm RMS., mmmmm Wmmmm mmmmm mf � O� mmmm mmm o "4,122E 04y2m NVNMa ANrVh M pm 45022 2IM0FNNO2m0 OfMpM WpmVpONQR' :=NOC 06 066 CNG " "'OEC ,Mei44 CUI eh' c11-1 N GR IN NOI R V FINN 'OItC(h Oi Ql�pmp Ole gi z.7 atG pm OjapOpi �y�mm n� OONN^ <OfNMNpyO1 f��y a�tE0pp�1mO0 NY>tG�t�ph t+l Al+fFOf V W N m W to r m W N m O m rp m O m m 2 I h 0 e m r°D a N M I() O N Wv m 10 m N N t O t O f O f 0 f O n r`�j A A n n e m <V V mm mmmrA rmm2m 200 lh {h!{hh O T Pjt7TTT TTTTT Ojl TTT '?44$Y g444q 44Y4Y 44444 444 4 44444 44444 44444 4444 2=27 G2033,"Zg 4E0T m O004 2;71M1 h g°00OANMOMONrtpp Eehh M7044. 704a v8Vj VAA 44 AA MEI 0m0 OO tmOp p�O NN IGNIOO EEGAIOpO ON eyNt0�Otn0I tyA0O, cc E e "P222"M" 8821 WEpNM mNts22 N W GEE g1,9126"8 ggp;O.1,78V N V W 22E822N 328SN t88E M nh Mh 466WWa .. 44 Se 4 yytgSSo5 A AA2m2 222 20044444'44 qve S 444t.tvWW4 &&ev< sy y� 0 13 "-A'8 EmC n a No MED'o0 00 .2OD�N 38E8°. Im1,Np O 2 NNDp NG OOC&S W4004 E 4QQ m N %2$38 2$O8248.% aN842 25108 4AA4i; 1.122°_i2 rOpp2014 5ygi. NNNhN O 422202 WWm mOeea vvaav 4444$ 44am 444e4D 'A04pae 47QE .45E60 C CO p p p Ep Ep m {.j�p Q pp Ep Ep m IJ ECG 'A W gE N OAE PJtOha P-3.3D;G g 122 EDN�tpO�7p S�a(a g!MO Ep AS,=6!,c lL4 X4.11 r m 2011 O(pop BS y4IN(OpOIh M m Q 0j 10 EaO tipp am fO EppD W4g1h 0 N N N N N" N N N N" N N N N M N N N N ,7,;8884 N N Not :1-'4444 N N N N N N N N M N N N N 8 W E^�� ..... OO aO0 Onj ON C�tmmm0 <N V"W EN("N 4241Mg:=448 :=O<O Nm0630822E4 pyp AAD W NympNEp2 80224 W:2.a f:A • O y rm OEDNM vmmr gmS2 ; MMA&12222,7 AIpNON8W0Ep8gmOSNin inaaAn1m�N N {tpOE mmmmm 0'282 ....ft WmmWm mmmmm mmmmm mmmmm mmmmm mmmmm 2222 s.N 2"22.1 rn'ao' Eg1244 NE';3Om 225,7'86- 25, m^ g2224o 84Nrzzi2 mma;sM • O NmMMM N0002 OglAz.1ggggg gg gMAgAAgE Vgi@8 e3 uPNA i aOmmtAM 721 2 S.4f2 A,*2A2,85,*2A2,85, mNmOg 022 2 2 ENSU% AmD2020 ym NUNaWN E��myju�EEp�p�M��Wyj rIE��Oy o�EyyDj de OIO ED W ED EO O m W mem a ..-o. Nmm W ma m AmW N m W ONO N WNmA m N N V W M 0,0°0 NO0m ^m ODIm S. r 1w N S V m m m N a N a m m N N Ol W` NAnm7 N 44."."44 NN Nmpm ° { NNryNNN .N2 { MN NNE MNN (VNN MNNN MNNN MNNNN MNNN NNNM NN MNNNN O C- N 8822g1 2242 N V8S8 EOOnM 2A002 208W; OWEm W MEAOf�+j^V OmIOIAhNO NOEO90� OE v>�O MNNNN MNNNN MNNNN MNNNN NNNNEy NNNtNhM MepM' NNmAr rrAAr O%mNm m Oi m ONi OOi m E m m f OOAi V NMpM 2%"""72 HtEENAG m44285 vy2Sj�8BIO, ESpNA22�,% 48'.325 m V NOED l�m�`83EOWD ,1234 W t8 OmjAMEmO, So NpAj N AA,W W Nth W W MMAW W W0 OE MMM OE Wag OENOmj Omi Omni SSSOO OOOOE 02080 00000 0000 00 0 p AAAnm WWWWW C'J 8 O 05 - E � ✓ k p U) NNN N N N 2O MN N VN NrN N N N N N N N N MN MNN N N N OOON o I nAS2200NppNOAA 824R4 84N4NN44e2Om24aaWNpSVyaa a; 4'',;3 M oW104 NM ONNM8 4NMdd MNW4N ; n, d 2;WW 444 44444 W�8V2 4rOOS §4442 FipN NNN N NnNrNOOO _ NNN NNN2M3OnN NNNNN NNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN am N N N N d 44444 141W1 44440 444d4 44444 d4dO4 04444 111W1 44444 W4ddd 40444 d44d d f!..3 N W C D 1nqw4N4 1m iyN rM M M O EN NLL N ninO' H W NR IN 40 `C -mm m"mm- D mOYI . D MOl OOI OdN y O1 W4Dn .WWWN 0004 rr4OO OMMNN 00R OdWWNRCRnDyMiDDOR J N 22222 22p122 p1,1,1211NNNNNNNN NOO OOOOO OOOOO OOOONNNNNNNNN NNNN NNNN NNNNN NNNNN NN NNNNN NNNNN NNNNN N N Nr 0 ANNNA ApNNN NNNNN NN.NAA AAANN. NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN AAAA Go NOON 3COG8CO>4OO2NpO. ryyD p pp A4p OIOON pp NN A y 31pO (9((m��2�22 VtRO 142282 41O(12821;24R ;pVRrO22' Rpp AR 4Npp O3OO 8VN VR4 N 1M AOVd 32:=-2R 2:=Or 2nMm 1NNM 2121NNMm" "8" "PA NNNN NMA ii"O4pOO :17"Ig UyRpM11 W OOWWO 2O2 22 2202 O OOOOO OOOOO OOpO OOO OWWON 22220NNN22 22200 aOONO4OD S OOOOO OOOOO OOOOO OOOOO OOOOO OOOOO 00OOO OOOOO OOOOO OOOOO mom.. OOOO CNq 22RR1 21;014442A42E28N NN;NaRg4EN ;2242 22V8 NOrrN 4'4222AN4InpOMM; LRUOrV M1:" gPLnNT OnNNNOOLOAO OONnA W iiAm LOT 222 OOT ' pRM 0§§�j RWNA ommaf o Oo .mmmONNiRfNNN NN 74:42OyyTpp NndNN M,MNN ON0OM 2NpO a Mn44 O O41(f 0 MOWN. (0001 Md 0r N IOMM,-O 0Oe-O V N �-r O N O C X M N 1 n W 884.;4 8:2.48,T, M2W02 N N C O N N t.21 10 V r A N d V 4 4 ;$614,s2 NO44$ 32.8:1'2 4 4 iG tOp 4 4411 O 00M N N N N G M O pC C O C N M W MO 4 M 'n1?R M '7g" 4 44444 44444 44444444 44444 44444 44MM4 MNNNN 4Y44O 440 t h N 2 N MRSVS N Ar 282 2f832O V IO3R;44 24N2N 4 V OON Od V A. 0 Of OON.� . . 441RA 44g2; 2282 WaWO . VddY Nmsg.; paN %N ND. WRpN NryNNh . OAN ANWNW pposhOti2Mppa 7 77777 N �C0 <p pp � =mA 4484283V'AN 24: 04 4N2d4 RWRRA R4N42 aaA�10 N.1.4 ::4.42; ONMNN 423AR SE42 J psryoo gm6-09 88822 . 0NO8fi O0ON OOO OOwOO OOOOO OONOOOO 000p0 aada a a. a C 4yO_O NCn(8 ,S4 4 A(ANDnaa yyn ODM 24222 4222 0.NOmN 4;244 MN Oyy U VR2N ptO 4A Np 21O( OnNy 0 R;;82 na ANOV N00nWNM rn0oi4 opNaiRO0OP800 � 0( pn Ova_ N OOpAr rOOYmWOOOd O0OO OOOOM 'yyyO OOOOO A frOOO mrnn aQ oi roi g pCP MA48 V pp OYMA2 8;822 8rO1NONCr IgOOU Mpp OrN 28$8 Wp842,44HOonn02244 ;28R $ Fm O4 P-000 MppnFAlt mO 2 gCO NM24; Npp Nrrpr44228 ;VNVV r482d 8A4.22 4N48n 888na 11222 2AV88 SRA; "i" M " "Mr' MMV g4cg1 21141 2V4 4 4 4 4 2=g; '45°..!4.$ r04 V d ;81g8 04D42 m W E,8:224 2MC2D I0M W f0(4701 r V.raSUO0 N4 Nt20O 03.!=,421 N2212 OW tEN O Hifi igggi gi g giggi Igglg gigig giggi iggig ggigg g M 8""24 NNN IMff 0 ;224' OOO M V O M 4 ;42R2 2043R8;V43 r 704 N 34232 43 M V N V 2NN 288 8822 F. 0 Nr1nnr 0O11pMfNNO2<VV ,OOdO0lNpNNNNNNN2NNNNNNNNN,R; NNNO E 11 O O t D C A 2Mt0001 OOMN V ONMYN Nn1A24O OfN22GQG a2f1MOOI gOOdpp CCCppD Upp f0 rON r0'Cop OCOD p2p V M V 1MO W fnOOR1N1200 N OOO4 R4 m Wm WCRD NWO2M NODOCOCODOOO 040 n"g ""W W 2201 W Op 000DO1W 2 F;g0O CRDR401 W W WMO W W WC4D W W W 11W2 leg n1Wp+ P,SP, nW 4nOO10 NMCOOp CWp V ON W NH dR2SWa 2mp 82 CQ�.704 Op4,71101 a2O OpQON�O aA no0 p2�p 4�yh Xgp(^;24 OOD ppU npml 33288 g4p11000� gsm; N MCI C'I, O q 4fO 5"..1-t=r f�tO CO(OR4 4. 00 O'4 C N 4 VA: 7 d 21042(0 1i'401 p8p0ppi N1t+l O " NN NNNNN NNNNN NNNNN NNNSR MMM 0 c'J U_ I f � m C V ❑ to I) a M lc \ � g ,e |? rigP 2§ r. NNNNNN222 vs- I !,*m***** ! --NNNNNNN NN •- iip ©;§0§0;; �§k J 2 3!!§!§!!2 }® f )()�(§((2 § ,&2-22 % )\® g'P|g§§ ƒ2|22§ �k § g° a Or A } 2 CD >� j�\§§§§§§§§ \ ! ƒ §E HAAAAAAA a a a a aa!!J § I_ / 7s e. k ` § ! fc ) ®(@®8888 zza a | « ■ ;g'-2g0f / m;!@�@kR; }\ 2 ° 1E8850K¥q qm@, 10� 2 ■ „Oo, ( mmmom k, ;£ }'1' 9 cci { } : \ 12 IL § . .. '2 U, 0 7yW8 2228'4 WC2P22;'1 n M N NsCMNW N N00WM OW WNW MW W U O 000m NpWtyW0) a Op }} aNN VOOi.- MM ) ON = O OONWW ONWOr WWW "'s NN2pO 0N0) n ONrO (0 ILI CO m MryMMM MMMMM (000(0(0 WnWOw NMaW 000aM M0) 0S0w0)0m 0)000)0 0)000)0 0)0)0)0)0) 000 0000MO000 d 66666 66666 66666 66666 66666 66666 000mo666o�� p a.) a, aaaaaaaaaaaaaa ,dadaaaaaaaa am-.4-4- a r n n n w m M W'rte • M7NNAM WNMNN WWWWW .pawnM rOMW— NM a0) Wdn,-n dW® p5 s 30aw d nMNK° MMNMA I'aW WNNW2°''21:: WVar0 ONN3 nrnAA WWO00 Wd0)W Ma-N; OmWnW MNOwr go.-m2 0)OWrA_ WWWWW cocoon ...am. daMM MNNNN NNN.-.- O C 0 3 6-, 8 m mrrrn rArrm rrrnr AAm wrn wrrrrm fmm- NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNN OA0, AOOA^ OAAnnOOnOn 00,0^ ^0000 6O000 00^A ONQ N N F M C W W EOro.°2 N°2288 2221:-.8 Kg4V2 MTNNan NjM W W �NOrm Q✓a.A lEo., W N prMrm m(8o W NaMNO) N.rNN Nn0')ANN AMma R•qCW W W W W mm WW�Wp�Wp WW V aWNWN mW rnr 14- .1 'pip W W W MMM NN�7- W W pWj rn m rn rn W W W W W m m m m w m m m W W W m w 0) mmmwm mmmwm ommoo mmmwm 00000) wwmwm moSNE mmmm W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W chi^�00 Mm�.mM 0)..m. ommwm • mrn moi- mmr—wv ,,mmimm enom cs L o t.:.--64t6 m N m m N O):0 0 a N r V W'- O N n n n nLComom moor. mW00 om . m0) T22 Wmmmmwmmm0 Dmm mmm wommmWWmmmw mwm 0 m m pp 2 W W W W W W W W W W W W W W W W W W W Z W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W mm... W W W W ..mmm momNmW m NNNNN mmwm Nmm mmmNmm w,8WWW Wmommmwf . jj(NO2 'OO 0)NNrOmaWOar0aN0g0 a ‘P.,: 0? 7O Oa aThO ) 000) OD O 000N Om,- ONNMNW,-0.1.,- WWsl- M.- NNWO'- U•-•-N,- ON 00 • CD >C0p09N 0ONMC NMMOS 248'48 aN V O < �O M 88W) 2 V?w.S0N p DN C OOOO OON .-aWNNTO(NmWaaNpCCMMagM . 777c? q9 - 0 '1"1" T yu � gmr p z 0o 000 n NOtWOn ONO V� D)ON0 a) (0NN0) 22Mp aa) AO ar 0 m0N O O O O '110A W O m n W W W N W O m m m 0(b m W N W M n 0 m W r W Y N • Q N /1.9w, V N M dad W W W n r W m m 0 0 C Si ' . . t t t . t . . t . , . t . N N N ;7'r7"7. co j W (5, J t W n m •= • • O 1'C$$o�a roNwN1T Nmro0m m"u30) 22,802 0NN�M N)rpn,C0 v)aon 28 • O O N q Op00.- NOt00iO (V OmON (OmG01O N�00(f� mtON00 MrMN W Ntr00a (O U v 0 A a A = g V O ,-NM a W W n W w,-M'^ ,W m m N W O •W • M a N O a (.1 N N N M M M d d W W W WO,, ^I 7 F==e r N p' r • E 0 0 . N M M 2 0 D o m Q wiNao.e.-c a[O)N N.-Irp m c m F O N s p p pp Op pWp d �Op ONr MOONON V NOWDOWi1WO MW W W r WWWW0 . wM7 hcl N2q,8N NNyNO Q t Gp00� maoN.NM Vm0-o 0NOUN 22g'-'42 2282° n(0Na)) aaaC 1 O ,1-r'1- .-,-NNN NMMMd ,W W W W W rnr L Z � O) y • O C H O (� 7 C 2 N d N =' y A • D 0 E N O • •W• m • 0) • 0 • Q] G W 2 •t 5 y 0 Z% U p N r 2:222S W 2 r 0) N 3 w N W r W W M A W N U 20872:= O o M n V W N 2 w W n W O U < < • • C IL U Q O O m• W C0000M W NNW W 0)[O W 0) W ONIhN OMm0 W w W U)O W(Or N<OMN m U W m O L C O m y 6D 0) ` e•K Co Ocicic Nr�W N Ntd+)V dW a )M()N(NOyN IAds0)W n',7,-"f N0 W N O W t W L J Y O • • C O O C • •!3 d W W W W W a M N i?v)[f f N d W .O M.0) R q u 2 0 0 C p 0 _ t U Um 0 0 Km 2 _ cU O j ; W N°>1y W p i W ' A 0 9 0 0 (d W> > rr WfFF2 Of zt,,J p p {p W y `� Cp SjpOOWi. �MMQP') NNNMarD ON W Nm ONi tDO�r �nwi,naN ;nim ���� 0 f OmOWO�N ormmMr tW+).-4(iiN hcf0(Wo 0)y°W 00) ISN W m �•i06(06 W 000 C O M a N W n 2 2 m m O N N M a M d d W W r n W m m 0 0'' NM ' 0(0(04 N N N N L VJ H O O O O W W r r W .-,OV, A O a r r d W W,- N d W W M W O M,-W r A y N,- W,,--W OCO yC7N7WW ONNMN d,-,-Nn m.-,..moo WWmOW ONoM - WdWN nWWd G O ,-rani .-OWnNOWmNac4A 22�00)ANO* W2, O NOVON F ) NMmW yOOOnnW N N NNNN d LL • W W N m W m M O D 20p, W M M O( n 7 N M mOp n 7 W7 r N,- N< p,—mM Md,WW p NI.-MW O •Nm M 1MO OWO O ▪ C M W m W 0080 OO000N N N c16,-.- M M V W 0)W W top°t0pt00w t00 W W W0tW0 tW0NNN NN'-(0 E O 0)N,- ,-,-,-NN N NNN N N NNN N N NNN N N NNN N N NNN N N N N N a 4 m m�3 caW W ••"Oj p �d{ p� {(pp aa 0 0• 7 w Wm W O Om0NOOi. 7000)000ri MmaNs MaaaN NO�a W O V tWO1W, V MmWN ODnaY O C T W 8 E229'- 2 .9 0 C 0 00.- N0N0)O )ON-00' 10(00(0)0 M66o, a W.-.-N 00N.00) 0(000 .-e-,-NN N N M M M M MMM M M a a a N g m N Wa N R W 0 2 N O •N N '° a N-O L M L O O) M r'0) m 2 W V a M W NO m pg N9 r m W m 2 m d N N N 0)N M M Z Z z O O • 40400 Op y O p tp tp m O NNm yWNyO) W°V Nd MOa000O O V Ata an oynm N m<Mm mtNp yN W OMW•-N MMaIOW ,WWM)M O1-1-NN MMaVN W,WoM 00�,-(N MMdW E d N N N N N N N 0 O • o fG W m < CO • CO W C w Y Wi . .e gN C__W ..z ;'2,'" W • Z 9 0 LL IE sa a m $ m •O�J0 V • z 0 G Lm•T9�if:1N E W C Y p • 8 0)m 2 Y 0 3 > >O ° 0 0 rc O O d 'C a LL'U 1LL 10 3 m N N F U J J U U' U K F Q In 82',;28 p a p 0 p N 00 V MN NNlMO NN m O22D'0Vl+, CC<a8 p22P O T�2�Npp2 28282 OS M rk E,§2 t00 FIEa1 y h hl�OOtnO N r g O N a n mNnnm N8MM W mNINOOM lWOoiNOIO NNmOO,o OiW MWm W gM W l00 N W NNDOM M 0 W,.aa- NNOMM NOnl00 0 N Nor../NQNA N t O a yy m d n m V M O o 0 O d n N N N N NOD M M W TOO TWO lop N O H O W O N O O O N N N N MMM V n n O l h t 0 .N N n O M m �o 000 0000W $10 �'IQi�W W W W Wr rn W m m J w��wm r,m000 00000 00000 d v. NNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNN N a aaaaa44444 aaaaa44444 aaaaa44444 44444 4441.4 44444 aaaaa4444.1. aaaa M a. , . I , „ I „ , I , , , . , III II „ I IIIII , I , , , , , , , I II , . 0 m M U f N W p p M N M W VOVNp np 0 D�M m O{p O W�tQ M i O W W N W W n e- W W m r W VMV1-0 0 Ol t O M N�Mp y VNVOM dp M W,D W I A 1 n OWN, N o NN�820 '4'2712f ORi71Mf OOOoON,ODP rzIz 282 d ANmO mr8aN M Om1Nr t00 '4;1°,282 NNmmOI OOnN S NOOinM O87N N _• r n t O f O N M M N,- C 0 „,,„ „„, AAmoml$ t....lmo totmommlo WWWWW WWWWW WWWWM WWWWN ...win NN.�� ....MNM m wmRrnmm mWrnmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmm N NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNN N A C COO O 66666 O O A O O 66666 OOOOO 66666 OOOOO 66666 A A O O O 66666 00000 6666 0 N M CWWaa&CNN e� 0NONty VMNp WN0nU)NAN0N 7RaaNNNOMC0M0NWWNW NN0 1 O mmN mO NDtW OOOiNO MN � 1,6 nNOMN 20PMm28OPO00m0OOOm n0NMn 8NNOLSAc1W8O2dAMN NN mON1.p2S;--PS WW;2'D ' 0M NN0r0 mNP MWNWii"AKOo p22mm MrnOW ooWW W 0)0300)0) mmmm mmm mm10Nmm NmR10ma, momm mmm NNmmmmmmmm1om mmom0 )00)0 ammmmmmN ....WI N.M.. WWWWW Mtn... IOWWW WWOWW ..... NOMWW WM... W O N W W W W W W W ....LW WWmW C m 0-20 d0000maNVNOnN"2W;-, N4AMN00amN "-ONmM RIM; '000N rNNN1. MIS ▪, 0000 N2 ypO 2 pp WMMOMN WWW pONN0V 2220NNO COMMWWWmppp 2222 2 2 222R OWW pnpO5 RoRORD WW22M 82E22 22222 0002 z 0 M2uooWWWWW 0)3010301 WWWWWoommo ONWWWWWWWWWWWWW WWWWW W30WWW WWNW ooNmWWNW0000o,moo000moommom000mN000mooMNmooo olN oo oooo oinlmo000 J VvNaNrmsNNNM . NN,VMN,-OM y.- �.- MmreVVMWarNNlM W0. MOW. o . rVmOm.. W 'NmWnNWgrO, O = CVO� 0.-000 6600 �—.-O NC,-NO CC.-CC GNomo N—Co 000.-c- CCC.-C OOON,- c-c-,-,- N ON W W MN W W MIDI-m V Try ND Omm W nn W 0 'N V N•- V.0,-0 N N N N d M M O W NMN W 2 N O v W W Om ' 'Wm0 WWNWW WWNW NW NWOWm MW WMoW WOOnm M'WMn WWWn NmMWM 'Mnm W IN NrNc-c- 6666n Ol N to C7 0)H thNN rN6Ny 66664 6N6NmN a Nr AN V NO)N INN N.-I6�NO W NMCNW 00020) 0)'01 NNIWN WIOWN WI 0 mW WV WOVW) ON-NN-C) wmO,N,O OONW00) NNQV N; n T T c,m 000•-v N N N M M M Q 'W W n n W W m 0 0 N M M' 'W yy yy {p VV N N N N NNN N '1"1”yN N '1" l NN N N N N N t�) M ND th lh M T th 2"N V OOtOA r mmrtMOM O W W mIO MN.-NN O N d N0 00 PNM)W 00 NMmON IN3 000 00)0000 N-o00Nmn O V N-0 W MAMN m- N NNNNn NMMNN 466.-4 aNNN N;W mw NN W 0 66464 .PN W 0)M M n Rr-N ( MdOWb t. 666,-m mM0MyV mmW $ NNMMO NNDO N NNNNNCl”? NNNNNN NNNNNN? hThTMThTTTTTTMhT q q ///// vq/IO ID T N W Km WOWW 8c7,2.1"4 nmWNM 04,0 W 0 WN'N m '528,71S M85',,%' OO,,%' Wmmm22';','A; Mm mONNONO AVaa M N p ONN- 0) mWNNROAMyyNmMMWMNNOAG °EOOOCNny N OrNmo OLNM CD O P N2pIm ,13 NW'-'M m '° � $20d mAM' 283 8 0) 020 �� N ooAONNMM � av 0 NOS.!. NNNNN NNNNN T N NNN N N N N M M M MMM M M M M M Q a vv VV C ' '0)M a V2 am N n'MOn 8^22NRO IWn ON,v NlMO Nm S82' 'mRR,0tm0 W P OOIm. W M'NM I(f N'-''' WMNN',1W0 NDN' N N M a r N -WM WNSNoMMAVm0NNWmmNOOMv RNMNOOMW. O ��NN N - V0MNmOMVOO VWN,- 00.MRWwNWOdNW NNNNMM- O W 0 N NMM" 'WWOW WnnWm mNNNNNNNNOtDm NNNNNN NNNNN NNppM MMMMMaa C D >. <O yy pp y p 0] W.-W NIONODon O-MV(NOON, NMm MN bOO,-O )WOMvMO MONNW WV,W. OMwVM MOWWM mNVMM ,666.-6 a NmW WM..- o W r N:6666 6OWNO 6666N: M,,m W' m W N m 6.;N:66 'O'W n W N m d Ol 6N:.,46 C o m W O N O.-m W m d 0 • m O N'W m O N M IO n 0,-04 W r m m O tt"h) pp W 0)N'I�m N W n m� M W�p m mm N d YI�p 0,-NV W N M O 0 N - NNNNN Mt7N� TT T114/ I/q TT I in i4(13 §�, n NQNQN0 1.Q tT !AW$ T$ 00000 .-,-,-,- NN NNNN 77 pp pp p p a I�M 7 W N W; W NN W V "W N)W N O N)o0 OOONNN 1000 W t0O CNmMC W W..-M M O 0 0 0 W N 0O00N V W 0000 grm4 pp,,.r .a. tai t0) .pp. . . . . . . . {M{M .Oay,. .y. . . . . . a. mm .. . ..,,-.6 O V3Nl6660.NO�vMN NO)p IM0)0 W N W 030 Or..-NM VO''V 000 W N NNIf)I�O CO N-W 0000 WWW. NMV N NNNNN NNNNN N N N M M M M M M M M th M M M MMM M 'fel-el-el-et • m.-N ONrWIml1 N.-MAM INOrNNDIN,- 01,...0WNW. NNNpDO.-O V NVDPIOOO O,-MN0 NN MNm O NN�y W O NMI M MOW W N VIN W W M NOi ccOcci VM OmM W M WM1�N0 6,:c66 n, od v0,W MM<v NND IO NON N W V.-MN. 1+1 pO pQ Mr lWp V th NO 0MWM N,-mMr l04 cmoc ~ N NNNNN NNNNN NNNNN N l3h M t O t h M N+,M t h M NNNNN fm',1.V V Nd a d V V V V V V M N .....0 ...WO RRC000)0 M00a RW 0) Mm 0 W Op00NM IO NP W W NOM M..-.. 0 V M NMMN.-WN O6SD N )0W hD0 NmMAN,. O 'OOO 30IOrNN No it W MM0)WM NMMMM WNM0 NocN)NMNWmmm0mm30mm mNVa6vWWM WWWm m66 omWW uuoWmmnv Ey N NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN N N N N Q pp .000. n V N W 0)n W r W nm mnnm W W m W 300 W IMON W OR)O thlmh�m`- ' tO' �M V W V M�NMm ar°.0N .NMIO O O N'm N M N O W O .0:!'-...?W W NON 0 Mu...C V ??V?? OOVVC? N0N ; NNNOV OCCO; OmNO ANNINN NNNCI' VdM'M M'M'M NNSV ✓ ""' ' Mdd" 'el''' MMM'' d"d' '2222 NNNNN NNNNN NNNNN NNNNN NNNN O _,- (OM N V 0 V m010v0.-NM MMOW NONNrN. W O-V C V NMV N NNV NN 0) 0NoO .00OWONmW O00NM N WNS0 6 10066 M N NN0MMyNN .-400mWWPrWpyOMNN0MONORNWNN.n MMWNm W ,'o Wm VmV aM0 WW MWM OWWAOW W WWnmm 00NMMoM MMmmO,-N M'WWW nWm0,- N + yW3 nW00,- NWdWW Wrmm0 NNh' N NNNNN NMMMM MMM MmeIMM"' ""' "'WW NNNWW ...WW WOWW WWWWN nrr 0 CD Ny U re "• O ChE ZoC e o U a Q ir • N (M �M 0 9 W nN8a M O)Erap 6-'8,°228 OnNO N M0N' OnN N0) NA :=224m 2218 t=„9,7,212 2Vp�QWNNN W O MNo m OyyNNMNWMVnW.,,. O}}MVvVN0M MW OyW.A .W.4. DN WN AWWvN ONNOV V. NNNO NO Ovvv0 00.0.v wNW + OrnNCWMMW0OO'v NNNNy.OVOV . . O W,, , Apy. pWMOMM .D OO OrM m W.. j . NN .... O , G.. G OD Mm. ... a NNNNNJ N NNNMN NNNMN NNNMN N NNNN NNN.NN NNNMN NNNMN N NN a rn 66666 OO00066O6O66OOOOiA0iOOi OOOOOOOOOOO000O000OA 60066 OOWOa O0 .O 444444 44444 44444 4444444444444.44 44444 44444 44444 4444444444 .... 2 a N A 0 0 M W W p•M M rn M W 4 W p W O M o A y A ID. 4 W Vv... W A 4 W n WW.,, N O M Y)N Q W n 4 v 0 4 W. N 4 W W 4OV.a,0q) A0t 0-4 W M NO)yv M00) M d 0 .0 A W t 0 W 0,..N W O v A W A M W W ,Av..p t 0 0y v W N O N N N W �N,pp �A,_pp�N,pp�O,pp�8,pS NoN OW.,. ...v v M MNN()W W 0�0O V W WWW W W aaaA�na}am ..O V a N NyNy VOVa OO..M ...OWN MM o0 M J . .rn... 2222,2 ..... ..... 2 2 2 1,. 18111 0)0 W rn W ..... ..... 12222 2 2 2 2. ..2. N N N N M N N N N M N N N N M N N N N M N N N N M NN N N M N N N N M N N N N M N N N N M N N N N M N N N N M N N N N N O O 0 0 0 o c 66666 c o 0 0 0 66666 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66666 0 0 o c c G G C G G d a C o N A A A n A n n Ann A .nnn n n nnn n n n.n. ...A A -1,-,,, A.A.. n n n n n n n n n n .A..A ..A. ,n N '' M vMNMW NmMONV0 NMN^pp OMMN4 mNAV2V . MNWO,Ov ...MN VIMq OOTNCWO. ...WN ODW av.-4 . mOoOm Nraa 0ONN OWN ^mWNvWW. oi ^220W2WWVovWDWWVMyONNa . 2Vgv MWvOOpg4. OW 0, Vv9 NO , . 02404NOO WV Y,OW daWW NW 2222. pppppp0. ..... WWWn ..WWWWWWWUWWWWdWVVWaM M2MMN NNNN 0 010WW WWWW. WWWW. WWWWO00.W. nW W0000 W0000 0000 0 M. MM... 2222. MM... 02222 .m... MM... MOMOM 0... W NWWWW 000NW .WWWW .WWWW WWWN. WWWWW WWWWW 0W0WW WWWWW 00000 W0000 WWNW CO2WO2OmNNyOOW7WnON4. OOr7, VNOAm0OrvMaNMA. p7VMON• ... TOWDNOOOm W. MW M.A.. 0 0 MWOW YN2WA2' NOn0W0ONOWNN 'pndU) 822n8ON122NNOWWONM ^NONC NN2'' 2"w' -c"-A2 NNN NzzM OO ) OO2Orn .. .. . WW, WW. M WNoy ^ 20 W .y .yVMM2p WWWW. WW8W. . WWO WWWW. A..nn AAnAn nnn ^^A ^ rnn22Z . . 0 . .0 . WW . W . W WWWWW .WWW WWWW. .. ... . ..... ... . . . 2 22..m ...2. . ... . ... .m... . 22. 2222. ... 2 WWWWNWWWWWWWW8W 8WWNW WWWW2 WWWWW 8.WWW WWWWW WWWWW nWWnnWNWWW WWW. W VWM..WW rn0^ 2400. NMVArrv2V24W WNVv0Nm20Vv. W 01WV0OnNvY .. o0000Wv . n. 0O..N D0om W0 , C'1- .NO.-O 00000 ONN.- ONONNNW'a. 0,-1- Oiaoa aioioiM 4aada 724 ossma' 0O2Vrv20vN2NMNnMOWNOvv0N2mvV2NrN0Nrrr0NAVN2vN2 M0t2OO ) O . , . NOYO0v0D0 0 AD r0WC N 0r Moi 4.i I,<<M NN ,p Oi O.2p.- 82848 CJ Oi 8 a�2D2-A 06.�a r 822,7�f ,7.-O 06.6 .-6666 as r Oi . W N2 8th A NN MNtO OM AOM WO M W.NM N4 W A W ONM W A N0p W W 0M W n. Ma,pp8 ONNM4 4W W W 4 4 W W W W W n A n W W.. .0 0 0 .-.-.-Not M NNNN ..... M a a a d ..... W. T W A A n A n n A n n "T ")TTT ")'7TTT '7")TTT T//// /M I. I/III. YYYYY /I/I/ YYYVY YYYY4 ///// VVYY 202 882r2 4112.7 ppSg2 ) 2Y, 22 O W 2 4222212;2 12;2 mND OOimx R.'2, 8 O 822 8 2,c1'22.3 222.3O',;2 M0WA200OONaaMNNOro2MNMar00O.NMMNWONnNOWOgnmNEO MNE00E0.W8W ,9,nYtq ,q,quj nNrnW TTTQ.. 0mT.0 00000 0000- NNNN. MMM44 442. 0 7A.,0 QD N QD yE,O yvyn Ny O)v O)M,,OOOMN ,m0romm 8N,n088 0,0.-N,0O), NMOM,. N W 00 ON,n82 8;2.. W,WO,4.M .0... N,O p8,MO pN rO WW 2„09 m,omm N p n W NA� NO6i20,2 ,m aviiiiN ,pm ,W00 MAONU4) M,mOMOWi.d- MNAOM)td V,AOO ,4 rON V^ ON,O^O R.128 4N4M0 co aa .,p 8,p8,p W TNN? OO��N NNMM,r) MMMM2 aaaain NMN W W W W nnn 2 W 2232 Mg..N :SOSO O V Od9 mmol MM Mf2Cmmm MMMMa 44444 44444 aaaaa aaaaa aaaaa aaaaa d 4d 4 o Q yy {pp a a _�'^ 00,,+)N00) W W 4,00 V .V.V. v0.v. NON)MM W .NOaN rNNNOOD O V OON. W V W n V ^NON,Wn 8...0 Wv OOAD Q 06 {WWO.� pp Haoiroi(p m A W W t,OO CO OM000CCC A,..0 0000. W NN N ON MN n V 4 V V... ....0 O00 N,0-n 0.0008 ppA O yNy 200000 M,NO W,Wy N NNN W W.. .0 0 0 0 N N N.M. M MM... MMMMM M M a 4 d 00 a a d no a d q a 4 a a 4 on 4 a d a V a a 4 4 4 a a 4 4 W,n W IO W WNW W 0.00 C D T l0 M vAoo4.a Nnppyy 2�..2y000.7W0ANNO8MVv2E MWNWyyONNiMN1.0ppp.-cpma 4WOMmiCO MMO O0.00 2 D0m , 800 , W m.-comm Ot7C7A OD o .(.43s,..: 0NpppNyOnee4. 0WWN mNOOOAWNOxnANrNNO LNMMM4a 44444 WW WNn4 v4 9, MN N m0 'O VNO. N MNNNN MNNNN MNNNN NNNMN NNNMN MNNNN MNNNN MNNNN Nvvv OW000 rn.. „ „ ' , „ „ ' , ' „ „ „ „ 2 yy aa aa p a • W O WNW a ON,WOv8 V M V 8y2p O2 V 00 NE4On)O OONN^ 0222nD,W ,...W M 8N W,MO V 88822 282,202 Y•-W V f• d n N0N .M.�a MN 00)23 W 0 NO0 O 0)01))4 0.02 W v V,OWO N 4.2 W 0 mmp W NMM ea�y04.W yA yy 10022 22.t2+) N 0n22hW .-oar... 4W.W^^ .. N M29 4.. W W W WA nnn.W 0..W. . ... O)Of OI Of O) O).... 2222 W ..... n A.n A A n.A^ A A W W W OD W W W W W W W W W W W W W W W W W W ..... W W W W W W W W W W W W W W O W 88288 O8N 0 7 NM V VWn0m .- nnWM... MW m0pVWn.2NOW2888 M2N 28888 MO... O O2WM2NN oar.- 02 0MWNN4.G ( NOiG2Wy0WY , OrN mmmNNNNQ0N2mmW842 ^220ENMm m0WNmmmMn2m, . ▪ VW0n. mO4N ( 2pE 0n08DCD . 0000 ,A.. AAAAA nN- 0 WWWW. WWWWW WWWWW WWWWW WWWW WDW 0WWW • NN2888m2V gr.-mot MMO N2ON.,. NN22M.O.. N V mN282 W m W r ^2N8 ...Mg N N 1 , ,0MW M,0n04 DW OOO2AW O4 W4h .m.o .' 4. 44. 0244mW WWWMmmMWWNNNO1D aN . saga.- WWvioi 4 44 4244 44.1.44 4M mmMMMMMMM . . WWE N MNNNN MNNNN MNNNN NNNMN MNNNN NNNMN NNNMN MNNNN MNNNN MNNNN NNvv Q p pp p O- N 00 W W N "244.2 NO6O002 2OO,Ay229 8n 000 0232202 V O22n 8222 A OIC 42 84';',88 N,0p,9O2 W'Y r 4 pp020 C N mg NNNMN MNNNN MNNNN MNNNN NNNMM MN2NN ,nn W,MO,n02 A2^^^ 2 W 002) Mo... o0.0 le?, 88242 28:-";:g 0A ON N 44221 22822 423,0.2463 481752Z; 24842 ,Q2882 208,1802 pNp N2,Mp Op, 4O T2 W NAv.O 4;.-rNA NtGr•N rfV A,V n aW2WnO2p G2G00)O2O2)0 00023 2NNNM 0M0,n+)Or Nm8NN tOMN^OODD 2222 W�^n$ EmoS E WHEW mW 2224 ,0 �i .�i... rnrnrnrnrn o000o O0000 ..... 0000. ....0 000$) o ,G Co ,O N N 0 E 0 O1 E c E 0 0 L 0 k • In 'yyyp aa pp VV yy¢A��Vp p�pp p� �Vp 0 • OAD 4.A.,.. ,ONDOOOM OONAA'. ODDAM00 N NOI fO N 'NAA V A.... Oi Of.O.. OaNDaODa.. .00000 aD0 .7t.Y A. aMDAON M 0 0 AAAA W ONO460NAM MMNNA OOm OA p IOMN A 6AA.M 6A4OMA.A.. OANOl MATAN .OIMfD OaNdD C 6 66666 6660)0) 66666 66AAA W Aln W lD A AA,, h AAA A NM MN Naa 4M MMN NN NA000, W AA, 0 O N N N N N N N N N N N N N N N N N N N N N N N NN N N N N N N N N N N N N N N N N N N N N N N N N N N N N 6,(6.1.- N N N N N N a J N N NNN N N NNN N N NNN N N NNN N N N N N 6 66666 66666 66666 66666 66666 6666 W 66666 66666 66666 66666 66666 6666 a4.aa4.4. .44-4.4-4. aaaaa 4444.4 aaaaa .4.4.44o aa44a aaaaa 4aa4a aaaaa aaaaa .4444 2 , , , , , , 1111 11111 , , , , , , , , , , " " ' , , , , , 11111 11 , 1 , . . . 1 . " ' " , , , , 0 O A N6A If)aa N,y(00)W Np NM LO NLI)0 N N M OA IO N (OD u)4.' N(s0�LI)N A (A IO M O COON.. ON0 a 10)•-0t�M 6606 N O M 6,a A 4O M'�A6i AO) A7OAA66 HM PEW ,MOON g""tNOMN °r map O)m ''''''`".8 W m' NM MONA ,�+ N MM W AOM) ONM�M(1. gV LO,NMN AOONOD 0N0NO0�[) V MMNN A;OOE 6 W MAN NMMNN AM W V MOAN M N N NNNN NNNN N 3i W.A.AAAOO 000 6 66666 tO 6 66666 66666 66666 66666 666$$ $818)66 666$$ $$$$A AAAAA Ommmm mWWW WWW$'D N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N N N N N O C 0 0 0 0 O O O C C C CCC C 66666 G CCC C 00666 O G G G C G GCC O 06666 O O G C C C C G G O 6666 A AAAAA AAAA!, AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAA, AAAAA AAAAA AAAA M N M co M 4OA M, AO6NCD MOMaO OANIOM 0..N.. 00A0A 4.D A ANAA MoD,N N IOAa A4O .N AaA V 8 8 M�NOO C M 4044 AA ANA ON �Np AGOMIO N.MA7 N.... .aONa A MA6MA AAA M a NAAIOO Nap6p Og,.:6-:.6 D OD OD 1� ▪ 4.6 060106,00 a0�NA W0')OOA 01.V hf60 W`Bi ANA tO OD ON V t6O W AM0 AA A'MM'O m .a-M'.Om'a0 m�W AM 81.001 W ALOMDN N N N M M a 4. IO A A A 'y t� a y e�a (p p G W M MMMMM 00000 NIOINONINO bNhN10 NNIOMINO 0 OONM. M40O0IMO )MOM MIO IO IAOIAOI(A)IAOIAO 460NISO'O'O OOOA t..O'O tOfMOmf00 N m160mmm m16016O160m mm160mm mmhbl6i) N.NN pN ISO160NmI6O IN460mmN NNNNN NhNu6)v6) 160160160 160160 I60N NNN m46Om460 C A O1'OMN. ONO.-NNN 0atMOnN 6166 0 W OON NOOth NN N4OO V NN MIM.-TM a 0000;160 mO A0N 00 0,MO (00)N-N AANO W NNO • N N NNA A A 00000) 0.2 p2CCOM D MA N A. �Np�Np�Op 16I00 V �Oyyf a,VaA N� aO{N IrMj MM N NNNN MM)01040 O pO 60A)m 6QMp.ODA m tMD NIMOM 0 A AAAAA ANNA. 0010 f00 000 A0 t08W 20 1010040 010000 00 1000 0 100000 00000 M 00IO M 0000 Z M M MMM M M MMM M M MMM M M MMM M M MMM M M MMM M M MMM M M MMM M M MMM M M MMM M M MMM M 'M M M ISO mNMN16O 460 W 160160160 NaNN1a60m NMN1601SO 16()m4p60460m mNNN46O 160160.160160 .160160.. mY6)aa46O1p60 0mm160OOpO mmNmISO 160160.. N A 6MN06 MMONOI ntOre+JO'0 NNMAO A 0mA. AAA,.40A400N'0 Lo,..A 4000'000),4.D NODNM, Om W OADt'') AM00 J CIO 4O N O.. In Q C7 �h4N6 ei Moir: ON01AM 4th IAtOO6 4AOO6om 4AIAMIAIA 'Ncdoco MOOOAN 4AMM.-G OO.-IN4 NAAAA GANG =t4+) mN Or ro NMVba X6(00) NN3 26'683t O,N) NN WN 0AV NNA 'is-J°4-'4°2 460VA 22"22 0N0N00A").OO N V ' ANOW O4ANhN, Nn66 NOOON(0N4 .-n.06 0NNGr:M64 0060M060 NN6mNN(O , 0 M 0044' MNNAO O6 AA AM.4MN I6 A MAMA. MOWMM 9D0OO7O DD70 A AAAAA AAAAA A0 OA AAAAA ...W. naa4 .4.4MMM 'NNNN IO 6666 OA MM aMY YYYYY YYYYY //III IIIA YYYYY YY4II YYYYY YYRYY III " ?ST T'? '? ooMM � NAMANA7'0WpaaAAOaMNN4-71. OO0 . O..A IMOMD O0 o .- omCDOIO. M.O. MacrOcd M4ONM6666r: 6,60.- r,r6 P AAMAA 6M60M 8MgMM aaaa M 8SeG 8A <AMDCNDWAMmm OOOOO RA aa4M ANN NNNNNNNNNNN NNNNNC NNNNN '1" N"NN ' ? i � j iMhTM MhMM ao O0pp O0pp Op pp p AV 1E Egg., 0690063 Tf00 0430.-010 Ol a V 8G 6000 V 28NNCP A t�O--DO W400 06.00 Np.2pOMD O pA O�mpaam.- OPS MNN r4.SG IN 04006)x0 �N 0 op AOND OMD OM)O OAN NM a a NONOOMO AA04D OAD. 00)m BiW W OD AAA. r:6666 .-.porn W 00000 O0)On)T00)T O6666 44r:doi M)O)SroOMD 04DONDONDOD -f a 10 00000 00000 00000 00000 0)0000 00000 00000 OO M I O M M M M I O I O (0(0(0(0(0 4 4 a 4 a 4444 ^I 0 Q y a Q N OAA ON AM.-NA M CJOCDtcl W 7OMDMM NOLOm ONO. AA 70646 ''2160 A'Om N N 602ND AmnN W 4.NCNDmN h W ONDM < �U) IA0)GM V ...AN a0000- NN W,A 0-NlO W AO NNO IA00NM ON-0 N M4A'OA N MON., ttyy.M C N000N Q 4,m 4.A OMAOM t06N1O6 N4O.00MA, O'er�N NN mt'h 060) ma a W 22S$8 OAO OAO OAO W m m NAOA WNAA 0 0000 a a.4M4010'0'0 AA A A CD CD W 66600 10 000.. ..... 0.... 40 4O 40 OO OO f0 OD f0 OO OD OO'O f0 f0 OD OO'O OO C D T (0 p p 0 p 0 p 0l a M W=N MA N.,-NGO0 N I0A 000NN ON A(N OND.N 4.r .44,4.-6 N 00460 NN O N N OM),0160 T� N OlOO N INO MM r prp gOOND'W'+l GADO 64MOO N N M M IO C r 40 Ott 66666 Q 4.a0 4O C AIA ,,1A a M • •-Oi IA N a N O OV(V M OV fV m O l6+) 88443 AO ANN V'V t'h f'O 0'1 N 10 O N 00 A N 6666 M m m L WOa�D ODF OQ 411'N NO' mm'7070 NNi l7 W"N-4. ,OMA 6 NNNMM M M.4 a 40 A AAAA A 000 N 8; OD ee��yy y ' a 2 ,Y,'p) Nm,W(6 W A NNN W MANN VAy MN...N0 NNNOI A0)00 00'00 AN00A M.NA. MOi N00 m 0(000 ONn6)0 M MtN+)17tM0)M tM7M0' m m tvini N+)'N')t'+)t'+)t+f tMcomm V g4. ga4. asggaom m 0140400 6'67666 MOA9tAhMta+l MMMMM 0) MM 41x0 W AA W 6 66 666 6 6666 66666 66666 040) O) 040)O)N 6 660)N 666 66 66666 66666 666 o 6 6666 A 0 AAA A A AAA A A AAA A A AMA A A AAA A A AAA A A AAA A W AAA A A AAA A A AAA A A AAA W voodoo 0�O 00A 0 7-0 ANION 7N N m 0400W NMN (pp'NN! N i:iilAC N W W V NMWO NN0 N00 COOO NO ) .AO . ) O0M. 0 6A0O . W4. � 0a4.y�(4. NNa ��02 0OWV0PA : DAAAAA D. .. , W W WWWWA AAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA . 3 A6 �m NN '0O'WAMao'AO.-TNN060 . O4. ANV0. aNA'aN00NNWW2 mOma N0OMnO D 000NAAw .OA 00OM OY00 ▪ A N.-‘,.-6 A66666 AAW W 46. 66 ' 0MMN a a Y464%466 M NN NN N6664-6 NNNN N AAA OOm A0001O ItolocN NNN NNNNN NNN N N N E 4 • V CO 6A.4.4 66 . N MMA40 06.10. AO4ONA ,N...NAA. OA.A7 M O66a . AM ANA66AA A 6AIOO A .1O • C A m M o 4 m O 10a M N O N N a N N A MA O 6 N 6 A a T 6 M M 6 M.4 A M A A O N A V 4o6.-v4 .-6'0 6 A 6 N IO a NAA A m Wm . . .WW W AWW ...QA MO.WW mm. mmm m,W . .M...W. mom. m ,... DO . m...m mmmm . 2� 6W 0NW WrMNS00' ONNO0040A. 0NMOO ...NA O V NMNMNOWA,.. ONAWA W 00 0) 0OIO ) . 0 D.. 10OAN + NN. OND 00pA0 . . . N N y G0 .- ANNN , (0(0AAAWm ) MNMNWSNW MM00, A .MM0000 OAW 00OAAN N ., O . AAAN NN NNNNN NNNNN NNNNN NNNNN 'MMM O A OD CD 6 N U_ a 0 € c E c Co O t 4r Lo 2 ca { 0 2 0- tn 01 cqr. El Csl Csl w 0 z t %2:,f ;G N!%22 2 !!*2N2222 .4 '4%` CO »§\ S. ;;2;0§; �k§ 52 k )¢(I-(k¢(7 9 S ),_;z z #� CD , 22-2�(� $ } `®§§7§° AFF § f�§„��4�.- i 7 78 S 2 % ) z k § D 2 • § 06• ,o )C , 67I! 2. / 2@2@2222 )III II-CO Cr § !. Ln 0 j ILI, csi § § g0 ��_���00 Eg ) \ ■ §;"')§(\\( Z 10 \ ~�� ` \{ cc;nia - ! | ..,,,2§!!§§ § U. °0 01 01,k0000) ( v, ■• fB to g 70 # / i S 1-. /\ °ri / ( EE ' \ .. 6 • 1\i Lj i Schiumberger Drilling&Measurements MWD/LWD Log Product Delivery )53 0 I^,k Customer BPXA Dispatched To: Christine Shartzer(AOGCC) Well No Z-66 Date Dispatched: 26-Mar-13 Installation/Rig Doyon 25 Dispatched By: Elena Greblova Data No Of Prints No of CDs 1 Surveys 2 Perform Letter 1 Logs: VISION Service MD 2in 9609 to 15778 1 PDF included VISION Service TVD 2in 9609 to 15778 1 PDF included LAS Digital Data Please sign and return to: Analisa Steger Received By: , � BP Exploration(Alaska)Inc. C �_, Petrotechmcal Data Center(1..R2-1) 900 E.Benson Blvd. Anchorage,Alaska 99508 Fax:907-564-4005 e-mail address.analisa.steger@bp.com LWD Log Delivery V1.0,01/22/2010 VAY,` HPJ HH HPJ JH4 N Vr- r m 2 !nmmm Ym ON pa Yw^. J Wr8AT 8pa0aT 44848 84848 WmOeAe 3;8e88 82488 a vv Ii!!!! A N2 0 2 !!!!! mi ^ !! !! $ !!! ! 22mmN `4772 CV NrN NN 000 1�l�1�l�N rrr 108 ma08 VVa811;44a12O BO c N c%N tp2 t0 tOtmONO Min ODII�a r RMI N NAS WM w w �rnmm �m mmrnm EMI mrnap n2 N y01 N N N N N N N N N N N N N N N x(01 E0 N N N tI N N Y01 O t00 N N N N N N tc2cO'F21::-.1:812 F21::-.1:812 A F,g2mmlmmA2 18A'<;,22 2 0 8'.1-,8P.0 o8'.1-,8P.0 0 Mo1mo2 88814 .2gO82MA 1$ 80 NOnFN 2MOMMmN M80 z 1111 FAME NNIMil NNON NNN NNNl 2 QOOOn (•1�2N2 N �^m °7T,. 288OIm W O� 12p2880 J O N Y m Y 10 Q N tOp ONI N M N e 2 e 2 N m 0 G�Z p O O N O t7 X 0 0 O N N th N N O N n CS r �N m N M O CD CA C000,L'N 18::,7481! 222 212 212 3202 O 248A2 22 Naa 8N212 O 06 O O O C t 0 C i O N N 0m Ngl 422'422 NNNN ON R e 2 ONOmN 7 7 8 F, O MI 2c8838`84' O O O N m Y O N m 0 ",;', E,1812 m N 22'42; O I O I 8.'28E2 O I O m N y z X0000 Y n NNm OO e ?W e eOD 211-,c,2138 m 0112 St O�II _ d O0o9.- N2mL v�N tp0 88711-2 8121:',82 Nf0 aN n nn rO2 d CD ^ 1 OD CO g% l''' y n m M z C .00 00YN m 200 O1-at Nm mn Nm 122 mn Nm- m • y 0 > > N 0 0 Y N m N n N m m m m N dp n 2 N N ?2 n N aD M O O N n Z 2 0 y O O w 0000 Nmmm N N O N ON2 '7:2:271mn802018 N O m m 2 �(nI n p N V m CI 4,O U 0 �p�p ,t . N 0. , U N' YNaONN NNt7A 2c.,8,Y'ItYO 0f E o g ,o o o a 2 m o t '9 G N a Om1 N N- m(L(0 F O N o 2c,983 000n 822;2 082001 t28 n N2cO4yN 2,21380 2,V486' 088012 0 d Y 0 0 0 0- "';--192 ';7,8,z2 801 t f Y 2 2^2 N N N Omi q V n O N N N l7 O N Y Y Y N t O O ,r z o b •e C H a G Z G g e O y f V 15 E: .. min f Q23 c . ce °'E=wl s'41. ° ?, o y 7 V O_ O • • C C IL 8 j� V p O W +0 0 0 O O Y ONO Q O D N O t.1.0-0 N LO a 100 O N Ot N N mm.-mm e t r r 0 020 T J r•Z : : Y y 6 0 Y p�V ; 0 0 0 0 0 ';'-g O t�l n� n N N M O O r 2 W 0�2`V i rO- N N 0 t N 10 m m -;-.7.7.,21 ,1 2 1 A W y ,1A y§y i�I ` g ' N N N v1 1No n e • O U o N u u u C K. 'a l c o c 0 V U U t (7 > . . .>2 . . . . . . . 0= 0.. a m»F 01-H 202 z01-J p pp '8,12:22 p tp a Y o X O g O o T 8 113 2 0 HI N N N A m O N 2�O N I N QNi N 2 N ON1 N 2711:8a Q F O,',t2 82q21'6 P§18&Ni2 87:1-82 RMA8a N1mOIN n ,-1-,2g6-, 3 N M M N 12 0002 mnrm ;.t oer n e P312 me O Nn m 0 N W N N'Y' N�122 ONNt7N a Nr 81� 001 On 2� 2�aNm ll2pp OmON N F ,';'n-4 N N N e n 'n I�a D b I O O 2 1 8 Man N 120 10 r O N r N L ^ 8 020 2 N O _ 002 corn 08122802 14.'12M22 000000 Na�pn yOln- pO28020 {ryp�Oap0120 U O N:t00 1-- 0,280 226-88 NN NN N N N tN�1N NNNNN NNNNN N 01 NN N 0 y2 2 N N N N 0 Q C N O _vc a wj O OGOA 0 Od1o_g . N . �mn11 O NN , 2O 2 8882 2pp80,2 N<O 30022 NNMM AOA o NOON on0N 'mmONNNN N01N0N Nt7N22 TN m Nu1mi_ cc tai Qit E. 7 (a N m m Z N n;m e 3 of,Q ,0,,F4-allo�N^m u 3maNNN 1RN�L<ZZ Zoo a N 2=82888 8282g OGO N<N 00 28,T m 2W.7132 aa 120' r0 O HRH pn2 NO O N 2rtp0 aT O2n AO1122 T EWCi, 2 g':1 HIE?, R 00 E • �N t7 t7 a N m 2 2 01 01 O�-'-N N N nl N a ��00 N N Q ow.; . (0 g4" u W g m Y C o (O 323-2 ; f 8 0 E 29.1_- O(� o `.t a 41:0 .38° . n o 0 g ; i ItEE3,1 5 y 5 • i f� 12 6y > >0 0 0 0 5 L O H r C U IL N i m`N N f U J J U U' I U O: 2 0 N. \ 0 2 |` § ra tR 2f !!! ! 2§2 2 JNN £ f �\\ Co §\2 Ael s � t6 § k® �E000 . t§\ A { E ;asks r �® /// )E U` ! q @2 2 . „ dm Ec 2- oor \\ m () . |£ i; a') ) { \ | ! I • Q0) / 1 . �,.. . Drilling&Measurements ',i 2525 Gambell Street.Suite 400 0 212 Anchorage AK 99503 Schlumberger Tel(907)273-1700 Fax(907)561-8317 Date: May 23,2013 Well Name: Z-66 Company: BP Exploration(Alaska),Inc. API Number: 50-029-23482-00-00 AFE Number: X3-011MR-C:DRILL Location: X=599,860.96US Feet;Y=5,959,100.11US Feet Field: Prudhoe Bay Rig: Doyon 25 Drilling and Measurements Field Support: Operations Manager, Ankur Prakash Field Service Manager, Hector Echeto Drilling and Measurements Field Crew: Cell Managers, Carlos Ilizaliturri Elena Greblova Cell Engineer, Mahmoud Farrag Eric Pennington SERVICES PROVIDED Z-66 Services Services Dates Depth Intervals Directional Survey Service 26-Feb-13 to 15-Mar-13 313 feet to 13386 feet TeleScope*Direction&Inclination 26-Feb-13 to 09-Mar-13 313 feet to 9863 feet VISION*(Resistivity,Gamma Ray) 26-Feb-13 to 09-Mar-13 313 feet to 9863 feet IMPulse*Direction&Inclination 11-Mar-13 to 20-Mar-13 9863 feet to 13386 feet VISION*(Neutron,Density Azimuthal) 05-Mar-13 to 20-Mar-13 3611 feet to 13386 feet OPERATING STATISTICS Total MWD Pumping Time: 271.4 hours Total LWD Pumping Time: 271.4 hours Total MWD Time Below Rotary: 402 hours Total LWD Time Below Rotary: 402 hours Total MWD Depth Interval: 13073 feet Total LWD Depth Interval: 13073feet Total MWD Runs: 5 Total LWD Runs: STotal JOB PERFORMANCE Directional Z-66 The final MWD survey point was located at 13332.03 feet with an inclination of 82.85 degrees and an azimuth of 126.68 degrees. This direction and inclination was projected from the final survey point to TD, which resulted in the following bottom-hole location. Measured Depth: 13386 feet True Vertical Depth: 8988.13 feet 1 I A. Formation Evaluation Schlumberger 12-1/4 inch Surface Section: The 12.25"surface hole section of the well was drilled from 313 feet to 3611 feet MD in two runs.On the first run the well was drilled from 313 feet to 2076 feet MD.The BHA was pulled out to change the motor bend.On second run a side track was drilled from 1260 feet after hole was lost. A motor was used for directional control during the runs.Resistivity and Gamma Ray data were supplied in real-time and from memory once the tools were retrieved. The final measured bottom-hole temperature was 71.6 degrees Fahrenheit. 8-3/4 inch Intermediate Section: The intermediate hole section of the well was drilled from 3611 feet to 9863 feet MD in one run. A motor was used for directional control during the run. Resistivity, Gamma Ray, Azimuthal Density,Neutron and APWD data were supplied in real-time and from memory once the tools were retrieved. The final measured bottom-hole temperature was 98.6 degrees Fahrenheit. 6-1/8 inch Production Section The production lateral section of the well was drilled from 9863 feet to 13386 feet MD in two runs. A motor was used for directional control during the runs.. Directional Resistivity, Gamma Ray, Azimuthal Density, and Neutron data were supplied in real-time and from memory once the tools were retrieved. The final measured bottom-hole temperature was 193.6 degrees Fahrenheit. Innovation Implementing compressed ORION data points in our Real-Time frames when high tier formation evaluation services are requested or high ROPs are anticipated is recommended. ORION data compression techniques will provide excellent data density for all evaluation needs allowing more data channels to be sent uphole and greater log detail to catch fine geological features. Schlumberger Oilfield Services — Drilling & Measurements appreciates the opportunity to provide BP Exploration(Alaska)with MWD and LWD services. Sincerely, Elena Greblova MWD/LWD Engineer Schlumberger Drilling&Measurements 2 In 8 Q o e0ppmWM� 0ypOm' pOOWp^0ee22.: WnnNWQ86g m2-"N G . ONsO M;g7ppOpO22. e.. Omm 1940 ppothOo . 0g,0 WWW 00W0W WWWWW WW00W smm 0tho OOgm O!Oj0Ol W OlNA W W ttttt W tt010 tt010)Ol T4AAA ttttt W tt0) QVeee QQ4a4 444aa aaaaa 4444a 44444 eaeoe 4444 0. a aR WOR N Q p mn n W0 N n N O Ny O mmmm Ni 3 WanrWtt-U3ErMF,..MFEMMg, wmO OOOO ( P NNNNN 84888 NNNNN 88888 NNNNN 88888 NNNNN 8888 O O G O O C O G C G G CCC O O O G C G 0 0 0 0 0 C C C O O O OCG C C G C G N u5 •`,/J\ LC mOp V 2 m 8°26;82 8°26;82 p,2 8 21 8 g 4.1.-38V2 W 8 V 2 8m88R2,7. 8V8;37; 12'42178 N 0 12'42178 p 0 0::n Olp W0WWiA,OOO 0:4MgiLA,FH 1 NN rWO w mmmm ..Wmmmmmomm ..mmmm ...ammo ..mmmm pmmmm mmmm 1 NNNNN ,7NMM MNMM NNNNNN NNNNN 22888oo08 NNNN (1. C =mOO 8W188 82t0pa8V88 “,-,28,7 r2P24 t28888 4.,10O pppppmmWWWO1WVg" mgm gAMMNAN "Ag" E“iE 5r� 7ApAW2 88880AWW88 Nmm 0mm om2W 2N§RW .2DW NimWA NN0NN NNNNN NNN NNN NNW0W WWWNN NOW 88 41 X288 gG ._0 , COON OO.-OO ONNlN N.-Oa 646., NNNO. Wv- N, O N OO L Ca g 'ppppO g N 8:=7.1811 8 8 8 O 0 %4843 4p4y e m�c Fl pp 8 8 on 2 442:28 4msm 88WN 00000 OONNp .7V ,NNNr .-NNWpy l• I122 mO O NN ?q piN NN01 - 2=88884 gN8C2On O 04 r 228q.7 ONO78W nN W 288 4� n OQ g W m0�V 2 m CCOQ WNM VOn, q NOVOeNpprN W W NN N NNNN w+ c 10 N J J 1D 22 o O 1pCD 2 N W W 0 8 W C N E=880 o y 882&R 2822 t3 2:2844 22422 88888 OWD(Np l Np�n 1 UO pNp N n 1,W '.7.14!O K N U t0 t0 W N C N L .O O OOOO.- fV iCONIWh O�[1Nr 0ND OIC COIOO 'W gm I(WlN ml+lm OOIA NN INO WNNr CD nN�� _°88O g p Upp Zp° l e° rN ° N U ' N l O: r O O W m m O 2 m Z 88 = 0 'C C O g 7 N 8 z..0 0 8 1,9= Q m r O a W s N-N g 2 m F O N>i d O=O O 4 N N 888F,2 O8020 0 N 0 W.z 84:2.44 N2C9WW W 2 2 W W ,7 0 0 O Na 1 0000.- NCG�NW4..74.,z3a �a6. gp ^QNNmmr ,4NTNnrNmmr - 0NN CNNQ ,722W Wnnn C L } L O s O o 1.2:C C O ` ~ C 5 La E y 5N c 7 A ›, d EUea yo o = o °45'17.- m cc ....•2 'T.a rnN2d7V UCCONOELLOQW Uy08 W= N9n nWWN Ny0N1 NNM NWN WOCr0NN n1 0 a V J OC aCd rV j OOC4- NNrrN 83044 22832 24W84 ,7,7'7; , 4 R842 D NN f f og • Nd E W 2 6/i C.. C-C f U U U d O > !.EO D d O1 357, 5 C m o d (• A N>>1 `2 H Ff Ni Og Z 6FJ N j 86881.2,m Wr X11941'9 NNyNNC10 87428'0; 8t4OOrr r2P;8 InON,8l7 8(01p82 d o ~ 0822 2 Om W 2n 80(088 3.1t.:28 W N8J4 mJ...-.1-.0WMAm OOO mNN 09 N W N 4 N W 1 0 0 W W O v-v-N N l9 N N N '4_01.N N L 3 0 m �pp (y a 1p p W H -.2. 10 OON N,mpN 4.t rNn A.1n 8N 218822 ONIY2�W71 pt4 L;t;, Ot8 K, {n W 44 N F *gig' Nf9tW94N t40rCNO 00�g V:2:2:2:1 Riggcjg Q Nt lg '41P 'p OOrN y 7- N N N N N LL I, N N 2 yD.22 ae p p lr��p Ep {p fp 010 O m O `' OOrflphVr y8O��8 C' 22p R.2888 prp NPI Om1y1 �81p�t(8p{8{p1“: 2:2.2 NON�m r4O{rpp{i2y� NmO�g2 O C N 6G p COmtON W 80;80 OOOg. NNNl7N NNNNN .........“M W N W NNNN NNNN N,,, ,s;-6 .-m E N N N N NNN N N NNN N N M W a 4 m LL < m N 'y3 u�i '-w ri tp . ..7.2 Q C N N r„ V 00 to 00 7--.L3828 W O W 0 84442 23r43 84222E 48128 Sg40 19 D o N O C 0 0 0 m N W 4!� pp pppp `O W 8 Q W N- 0000,- V NIGH MriMGsi ui Mmicom CGMotz; gt ggt M8M19m CW'l V K V N�� q W m N` �7' L7 N N N N W W 9 Nommp' M ¢'g° A 1 2 C 1 N O m N O 0 4 W d $j 0 Z n N n �m 0.N N N 1X N�tmi Z Z Z C p o �p p (p V� cp 1O m i88O�8�t188 8N pp88 p8p1 Nn{OppNN 88?ym-!22 SWP24 24 ONO24 2g22 1yntypp N N{tg{tpp(pppO����l�{{{lgpppO Ot Qggg .. E O 019 CO N 1.1194,7110 ,COO CD MM 0v-^NN mMQ Ob W,C0 8.NNN 2.V4 o co W ! N 51,3 ;19, N w N E d e¢r D 5a m .2 Q0 - "c 2Ji7 V o Z p y 9 • V O Q t Q C 8 O E 0 g.u y o =� Y u u 2 v E w a 03 > > 0 $ 00¢ o �� C 2 U IL(// 8 7 2 W f U J J U U' U [L 3 f CI 1 Y U, 4�Jp2rN0 EV r MmRE1 pp N 0 myM E N2 n 22 22 22 0 HIRE NRE m2 yN,2N EMIR MMMO RN En mYNiU �EO§bEi N2Nmm mNON 204p2E OEmO 22822 ,222A4 } AOrN4 ra g C ' "i" igEIE 000 O00 MEI EWE ENNN a ; 44444 44444 44444 p44 44444 44444 44444 04444 44444 44444 44444 4400 0N p, a .m.(ppp oO N(N']m0 TN NOai WEE r Hi:fl �Mth H _N nV(Op r N g.O N FNam^p mmmN O'f NN V Ot�'I ^m amyN pNlhpN�1� p�pS��pp�Om0 rp1Of mNm� m1�Op�f�p0�E�pmp� tm0 r0 m� tr�dr m mN��mMpp' NNEI v fmON�OtO r0N NNN N NNN N N NNN N N NNN N N NNN N N NNNN N NN�1 N N NNN N N N NNN`� mm 22222 mmmmmoono PPP-Pg Oo10gRP g10O000 ol0`0l00 ��oro oo ro lO��o�i0�Ooo OO000 l0\0010\' CpV NO�? 2371:22 y2yO2Efr�Nl2G N a NtS y()r 0�Ar N�rnNN�Ef�N N2NE2N V rOmM 7^�NZM 0n r02D E n NIr() :22844 E 2 O 4 N p 2 ppp�O� ;2m2Om4O8m2 2 222t-.2 NmON 112h2r11Nm MiEWimmmp MEE71 NUEO Mil 2 p EEEN m mmmmm mmm4m mm2m2 mmmmm mmmmm mmr m222 48822 2222 4y137;N24V00m1r72gp, N ;'?.EI!!! H,FP rNN22!EO i EE p008 0 $ rrrnn nrr Ella 2222E 2 222mm 2N242 22mm2 22222 Nn222 Nmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmm y§O 0%7eOONN MNN 20O ONM em OOEmM 0QQV! 3 gNO 422'62 2222w, 2i 22222w, :222F,2 2, 2. F,2, 72222 2222 2,%;322 8020A� 2� :=VN <7.22G2 m00N mOOrA 8422.e. 022. 2222:2 :2l7 217 gC1 222c7 417 mM E17 2 W m M2H NMMmEOAEr REM HERE 2MM0 0N0m 22E0 REN NEER 2=N 42122P2,7 82323 28m '4'=8p2 n2282 1�1 NM222 2Anm2 44222 22i�2r 21-222 N;22 O-Mmr ONm2 Q OQ'H m0E0rr2^pl rpf sE mNNNg, 8z 1NO10pp OOp� 20N � N .2271 NNN NNN NNNN 1N4NN mNto N N N M r t.�f.j l�1 2 17 r MMM M t�1 l7 t?t 7 l h .//'" a e e a a q a a u> to 1� m2 p1 p1 IO 1p Op (N� 1 XNpp 4282 100 NEN O N rNn{�WO ON� 1722X2 (O(80680 ppOl NO mN 17 NOOOI, EIrOm EImO 22 N17 (87021672 NNON O P-19! W M O " O O O�� N N M M M 0 p a V L1 4002 6 6 0 O f Ap M O N N M M V y N M E1 I 14244 CQ�C O Q Inn C O�N M il 0(1147126 1 NNN NNNNN MI NNNNN NNNMM 8222187 M17 171+1 OaNf o c N A 2 2 m Orf 180 r 4 081 N .V N O Ir` 8282t; O r O mmr 42NOM 22 0 0 4 m m m m m nm n 4 4 M 2R:=22 RNN3 N Mm 0 I�1+101N r JQ p02 44m40 Q2 '28 pO2 W200 2"22 N2'3`72 443232 2"32 O0NNN NAnnn 222 MMMMM 22pA C T N pp y a p 8.2 N10p EDOn ,824201 nEA2N V100VE Nt�7�m0 21 n180 24n02 016104% 22222 2A4E2 n42m2 n227, N 7 m 62422 221272A 2E24r6D nm2EA m2:242 2N48F2 A8,1-"2:1' 222,122MN2E M NOIPO 124 W SONQ 10p'00f00 m�('y(ay L • N NNN N MMM m M g 0 0 V. V e O 4 m m m m m m �n� Ort m m 0. M m m m m m 000 O O 0���� A N N N N N N a r r r r r r r r , • , r r r r 2 gA 4.'s222 p N 22 4 28224 22212 A84NN A N A 2 N° 42228 2228 2z;428 z;4ME O 247;24 47;N4 43022 n 2,.22 20nNNApp ;o124M08M MN2 2 2 N0E EMM CMAMM 22222 00000 4O44m 224 mMmNyy�g008� 22 gcn E2n22 .2222 1Npn22:2° 22!42102 A22,12 A22E,1 E 4 AP2M 2 2'4221 '4221 nP.7222 2 N 2 2r 22 16 o 42,742 2'4 ;4222 21rp 4mOeO2yy11NeA O m 878,42 M2228 2M4p00p087_ mrrgAEONN?2v2 E88R28MNE2NMMMN0 22242 22222 222 2 m 222AM M% M 4000 40000 204 Nmmmm m434 p022 pm M V88?< 2218mN0;n0a "822'82 28g28g3;;;; ONAAn gram E8220 2P,74'43 2;222 rO 3288, NONN NNNNN NNNN2 Nmm NNNN ELME NNNNN HRH NN2MNNE NNNNO EN NN N N N N i Q "W83 mr 462 266212 2NONn 202280 10NOrf OrfO 8P,M2 <n�4M 484W4 M7ME V1rp00r 2828 NO2N MNOmO 2m�O p 44;44 4;;4 a0 2;44; O p 0 0 0 2224; 4444; 4 2 2 187 N N NNN N N NNN N N NNN N 2A2,12 N N N N 2m21mor4 0 0 21 06;48282 ;2,7.6'2 87000 853262 nn220G8A ArN4DM -742M,3 4NNON V NN 7N N22222 4% 04224 42A2A 2 22234 22 2 :2:222222222 OMm NNNNN 282n 222,2 224;4 4444 444,m 22422 tii22im2mmm mnm2. r r r r 1D (V N 0 0 Cf E m _ .- v N ER y 0O(pO S p M tpa E m m EEA y ANDN 0 O ONOzD EEmE GEsn EOAa R m E n�NyM�NyE y E N 8 n N 8 JN ,7,;;<7.<7„q N0NNA NNNNN NNNN NNNNN NN NN NNNN N NN NNNN NNNNN NNNN a0 a QaQQa QeaQa eaQaa aaeae <vcvQ aeeaa tette eQQae eeeea eoeea active tete OpNOppp n O m M *611U,3 Y) R 1OM�p{m�}M N e PEW m M O p n y n N n a a I n HERR m n V m m m O np n N O M N N O y 1,n O� PIP 1,n ONOmP *611U,3 iCOM yn ngnc'i`fin N tlpph S�lmmmAggqp EOmptOt0 HE V N ONTOaami fn00�0] apn}MSNN clad ONNO 008 88808 (ONNI/!� NHHNN mN `0 �m��� nn V V V V V Mj�j W W A 1,N W AA mOMi CIEsOMMi EAE% C,J 2 ID CO mm 3 33333 EMI �< E 82828 22822 88888 mmeee 8mee 8mm 2828 N N N N N N N N N N N N N N N N N N N N N N N N N Cy N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N lo' 00000010' 000100 gOOlo'n000 10'00000 0000o OOOOno n00n0 00000 00000 00000 000010' 10'10'0^ ONN 0EV1DVNr 20V E8M0M2 OMNM A ION 0 0 vNOIOn2 :t 2. ^ ^ M EO�OONem 2Ni mEO N Nc2 N"" ^M " 0NOEA2"2^ "222 g27-1E NN"g Q2" RU2p "2" O2" 22 p222N2GG O0222 22222 ;1,2222NNNN 2241 .1413233033303N3GGGN GGN N 38282 88228 22222 8322e 22222 8ee28 8 8 22 82828 82888 83888 8E828 8883 C E 222000 20828 33242 G:2232 mONem8sno.n p24ON OnimON48,%2 MmV MmNN RANEE 02r2 -OONO0000W AAOe1 0%8RE Ng2N3V EARA Z 22E2E EEEEE NENEE 2EiiE NEEEE E2mmN R22RR 2N2N2 120NNNNNNN 22nN 03Nm NYD0Y NNY0m NN0N0 mNmNN ONNNN 0NNNN NNNmN NNN80 CN41 ."?! 451q. 4 2412 000mom 02W O,_ 00000 ONONN Nm'^ ^O^^ .7MOOM MMNM ^COMOm AMMO( OLNM W ZN t+O COOOme ?r� ! nN N41N E02MEN n 222:S pcm n%20+ N�tO20AO NV O N1, 88281 22841 n�041 0n2 22 22,21,2 28288 2.§444 84"444. 4444" o "444 4- A"vy" r0n2n �030�0N0 Ogg00 4404 g ZA G23.18 041418:2 S42241 2On22 482E1e 2410030 E MN.00 8828 8100080to 88G243:1'822BNt0Om� N 141:f 4 2 C 4 g 0 n r n�m $0:10c4 2 8 0 01 A O r A 02i S 8 0 0 2 0 0 0 0 0 iE "5";" N NNN C O Cp pp Cp Cy pm f0 1 XO .pnN 01'e 412(001,N CNp NNCh t02tppi NC00 NCO 88GR Np 88°2{06::p8 ON I[Ev 34228, n 8228 N 222D MO, .'=888.53 W N lh M = ROM� 2 W Mn N E�41 OMIO 00��8 NN MN INl� fN7MMM' pMp N a a N NEECOO COM O N 1mO1mO0no NO COO W O ONOE (O 41 41 MMM M M M 1,1,A M MMM a 0 0 0 0 0 O O 0 0 e Q e e O 0 0 0 0 Q a Q a lag a c v e v V O V V d O V V O N N N N N 0 Q NNMM INO�OOnD a QZ27.:322 E2�00 2V8:m F.OamN NAN2S ANpyN NNNO242',7.8 0022N 2223 NmO00 NN0Eg 2Og40 , 20o21H"cup "M022nON 822224122N2N M MMMOM MnMMMA 2200O00000OOOOepQUO 03mm0 04444 D0000 2EE 341iNN 2222 3Q0 WN�ZniND teim82 410 81,1,041 r21;i GX 2223.1 2388X21X217.2.7 MQ. 2 2282�ttopp 2N412GG 8G42.9 S7-823 4282 mtm cae0 NNEENOia NNQ QaeVV AM2 'pNTO 411,V EENE N � • • • • i. p8 d eZV N ONCN. 41 cok.3EN2< s3�01 C7 2d FO On2EM .°28%.. 0 228AW 2NNM2 02P8S 04122441NON O1,n22 EWNMA OmVV4. 72282 MMMM 2 22,%08 R.7.R8P glennnm2 224122 2mmc% 881,22 22%22 8228% 2%828 %8882 AAAA Nm 2'4.883 Mm3337 N N QN mO%M410 m �3MmOm 88'4.48 2 t 3 n M 22228 mQOM2 28182 NOM33 Q OOOG N3 ggg m 41 m88888 OOE00 nVN00088mmmm22.25OS2 1,1,1,1,% 222D 00SO2 22222 %nMmOm1,m2nM m 88.184 23GOm A(O R MNR Mw, N' Nm82Q NN022 041g41g 0N 2 nN m8E0 2:2222. :N 2N 2N 0 81428 4102E 21181_ 1, 00022 2 'ggNNN2ANNNN NNNCO CGNCGV- OMm30 m2M'EN NN<VV ONNQ< O<NMN NNNN NNNNN NNNNN NNN NNNNN NNNNN N 8822R1 208 N<8 N 1,0118 28'4,1'2 2g26-2 5'1822'4 N NNNN N ODOD 2'4 22222 r On V 24288 48R2:: 8t2,1,tQ N , NNNNN NNNN 7NNN2 AO20pnAAAA 20241M 0AAAA 220 0 iiZ1, 8824E E24 N 28.2NIH 442(00.2 EEMO0p 2.n�m OEp ONOO 0802 82C0p332 nNmCCCnp0p2 221'-412 0800 O 41,228 '00001 22mr n2Yni2Q 42228 Oq'q21�`$`�33 NCO2NN 288Vm� On%0y"3g Na4103N 22822 OCGNCV n nnnnOm '82832 N2mWm% Sm2mQ2 8`22'821 8�i288 08888 G8888 88333 08888 8000 8888 6 10 6 N 0 U O d Of E � 8 0 U, 9vn HMH EFMNmm 0n FWaim QH VI nMM m U OD MMME V NNN mN 101<1 0N p0N 1 X WHaWm NMg WENWiMWa RMmmnM. R2ME MMMbN QOM M NEOW 832g N NN N mNNNN NNNNN NNNN NNN NN M MMMMM veetT eveTT TTMmM vveTT TmTmT TTMMM TTMMT TTTTT TTTTT TTTMT mmmmN oafO a NN MN WN NmN N W n MI R F aM M O41 "11% mmn m MGO Om !MEI WOpO P P M 2OM2dM n Mn 3 rOOmm ng NN MMNN g2mnN 107,7 M mMM mMMN NMmmm NNm EF E NNNN NENN NN mNN 2222 0 0,0000 00000 00^00 00000 00000 ^00,00 '000,0000:0000 nnggg ggggg 000000000 N C NmN 4"" N "2 "rN n 2 y2p NmNmN27pp14 cc“):p 2p 22 ,°!2U-Y.14. amNQ N rO<n np 0 r N yy W 2rd 2NN 2 7= 1 ENMM6MT dOTMT 82802N2422 N2:224 32224 22r222: 2212123 N mN goimv2 mNN 2mMMM 2Me2a ee222 22222 � mw. . N 22NNN 22222 2N2N2 NNNNN Nmmm 2222 22222 22222 22222 NNNNN NNNNN 0Nm 2222 N2N2 2N2 NN NN N N ""d NNNmNM!N, MOnN 52N;I prpL"N NNEV 'm020 mNdWW 8M7.2 mN10Np2ft4iN ?,4327, NNNNN cg§ N2. = nN MrNN nNnN NNN Nmmm mm m22 ymmNm mmm mmm 2NN2 N NmN NMmNH NNNNN N NNN NNNNN N NNNN (9222 N N NNNN �pN N NN NNNNN �p a}N aN N NNN aN NNN �p NpN N NON 2 N 2 0 N m n t3 n A 2 N 2 M N 2 '42,3g, N c7,7,;H N d.7N N f O N V ENO m 2 N 8 g 2 o N N N M O O N 2 0 N W N O O c13. n d N In M ci N I� C NCM M v M r T M to T tL N T N N M n 6 . tL tG M M v T r N to c M C E"T2nMr MWNn dNNn 2Ndn Mrdn d2Mn N N M O N r d N 2 N N N N NON N Nn Wd M O M M n d M OaYYmY O M MTV; S T MT mM�WNd M,7NNN OOm OCO mM WrOnmNd N OV gm q YYgYd II/// ///// /I/II Y177 2E8 2P2.1.2 P71222 gpagr2gIe8'42 :=VVmN mmNr V1,V0N m Mp'dgNNrorHNVr0 mggmDgggg209 eMEd0NVmd0NVOrmWmgNi2mV2gnAnnNmAOOdN m "" "°""NN mNNNN NNNNN NNNNN NNNNN rNNNN NNNNN 88800phhNM 444c$NdmT co Ali ppaa 1106 pp N� �V MNanO m(OO Ag;" g'4 " mN'"'12!“; t9mNnl0 rd Na 10 W n r 00 N r 2ON r V r m2 11�6 MN N Oto CDN NT O ^J �v pmm N TNtNGMNTNtNp N T NT V T 0rT OO NUINMTC 0 " Og g OOT T §E111 TN vVvv QV v vMvV Na VD M; NNN NNNNNNNNNNNNN NNOO ❑ Q a °=V R p pp<V8SR Onix 7z , NA 8mN mrNmN fNDdNOEOO 21700 N r W 200 em tMONP19N N NmOENO r td0 r NN V NmNtON r,104N Q W`N 1,:6664MO 666.,N 2 N2m NN2 m�V nm Ng08m AN0NN Nnr0NpnOm .p8g2.p0g gggg2 NsvA N NNNy2RHE NNNN 92210013,7,7222f0222 bpSyN NNNNNN O C D t6 2E8 21: "2 V NN0n 2 2.7,222 RPi n3 2282 "NOON 22 2 P N mN022m :1187,4!2 02.W v mV pBH OtNN 7 .!° N mmgg0 d^rQr *NNnrrrr c, 2o TT^rr TTTTT TT/ q TTTT N77 mp mmmO� "t7 r r 2 o e N 42n27: Nm NN N N n 7,5 ' N NW m :=V2'44' r2 r V n V2 2 V 8r7:422 m N O O 1° 2 N M P 21222 2 2 V OV ON 222:: g—g NMgVQ N^Mg MMaMMMMMMg MMN2d VVdVO #VvamNNaaam;NNN MMMMMMMM p2,02 2Mm22m 22222 22222 22222 222222 22222 22222 22222 222222 22222 2%222 2222 SUS "L4.27; PmrrO {dp�tNp00RtN0 OnD yrN�aD OOrOOp t7 tWOMOymp l�f 2tO fn�lNN r p!'“,!m OQNp V NmN a U=Nm NNlN00Mi W 2rN0 III O2 2(2222 2222 p2p 02 p2 O2 pp OND 2OO2D22 O2O 02DO444 .D OO O.O 02D. 2d 02Dmm mm OD OgD OgD OgD W2 ram OWD OWD OWD OWD W aWDN 202 W EWO NN 2 2 10 2 2 2 2 2 2 2 2 2 2 2 2 2 2.222 m m m m V=14 2rrM V NNNtM60 Ad000� 3yy'4022 OrmNEND ymN VON 2Nrrt0 na601�N N v 2�N rNrNr NNOt000 NN22 P n r r r0 Or Or222 tta22t20t20 1202(262 22442 d V VON 22288 NN NNN N NNNN NNNNN NNNNN NNNN v tm0;120.V m O V bN W ONNON NrNAO mNA -7 AAmO�A 1,9 V muni(D hON2Q O000Art !-W1OA 1nD,W 220 N�ENO,OND. 2 mmmmm mmmmm 0022222 noanoOnDm2 mmmmm mmmmm 2222, 82;22 mmmmm mmmmm 2 218 mmmm 2 CM P22122 Ori02n20 2N2, 28222 m2280 21NOOmm 2t2N;718 t27 Oc'3z; 2Onn V,n u;-„ r0m O Mvr0 '2222 AN2mN MCMrQP 0M2 22 �trNN M222m0 m22NM0pp 0 NMMM NNW NNN NN NNNNN N8N NNNMM tMMM 0 <0 CV V_ E � 8 6 N O N w 2 3 J 2 v N � M A M 3 N N N 2N C .17;2 W 20 :ER O 2 `-'3Y 08 N 22 0 0 > as om)omm y m�mm�ommmm IV f4I IJNNNNIJN W mmmMiorom o0(0 NNNN NIV O NOu NIJ 8o 0E C C Oi 00 N 00 W N� > ! p H l 8 o1¢_L LLQLLQ ISLE♦z E X >. O D O +8'78 O m > 0 3 i Z i Z U 0 0 Q 2= 0 0= Np8p888 0E oim'ainrenev dN C$N r A� U1 m W L N_N 2 00 �!1 O N N d N N 0 N'N to y�csiNNrr r L ] y ^"aC aC tG eC d tG O 7 S d L 222222222 000000000 C O E IL X 3 N C O X p 69w h fX 0C ',Erg � r J ! f giUN(O(ppm O(O§ Et O O`-'ON W 0)�DON OO Opo > LL OI�N NOGG. O N' 0 O N N N r O N O D M.-0)0)00 0 0 0) 0— .-000000 j 0 2 O)NA AO LL J 0 •r.,(2 U N0( C d r ^yo2 • z m g � a 1 C o ; N o E w V Ern 0 o O Ettc 0 00 RECEIVED A STATE OF ALASKA APR 2 2 2013 , ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO6°GCC la. Well Status: . ®Oil 0 Gas 0 SPLUG 0 Other ❑Abandoned 0 Suspended 1 b. Well Class 20AAC 25 105 2OAAC 25 110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One• .®Development 0 Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. - 3/25/2013 • 212-195 • 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 2/26/2013 • 50-029-23482-00-00 • 4a. Location of Well(Governmental Section): 7.Date T.D. Reached: 14. Well Name and Number: Surface: 3/18/2013 •qig i Ai>(f'Z•f (4 PBU Z-66 ' 4295'FSL,2817' FEL, Sec. 19,T11 N, R12E, UM• 8. KB(ft above MSL): ,..pertri, 15.Field/Pool(s) Top of Productive Horizon: 3222' FSL,2190' FEL, Sec.24,T11 N, R11 E, UM GL(ft above MSL). 56.2' . Prudhoe Bay/Prudhoe Bay Total Depth: 9. Plug Back Depth(MD+TVD) 764' FSL, 1143' FEL, Sec. 24,T11 N, R11 E, UM 13260' • 8973' • 4b Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16 Property Designation: r Surface: x- 599861 • y- 5959100 - Zone- ASP4 13386' • 8988' • ADL 028262&028245 TPI: x- 595548 y- 5957971 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 596627 y- 5955527 Zone- ASP4 None 18. Directional Surve : 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): Y ®Yes 0 No (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1806' 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, MWD/GR/RES/NEU/DEN, MWD/GR/RES/NEU/DEN N/A 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE Top BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 40' 108' 40' 108' , 42" 260 sx Arctic Set(Approx.) 9-5/8" 40# L-80 40' 3601' 40' 3127' _ 12-1/4" 2189 sx LiteCrete,422 sx Class'G' 7" 26# L-80 38' 9859' 38' 8595' _ 8-3/4" 528 sx Lite Crete,202 sx Class'G' 4-1/2" 12.6# 13Cr80 9682' 13384' 8433' 8988' 6-1/8" Uncemented Slotted Liner,Swell Packers 24 Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) 4-1/2"Sliding Sleeves w/Swell Packers 4-1/2", 12.6#, 13Cr85 9688' 9565'/8326' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. • 10126' 8809' 13100' 8954' WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No • 10326' 8904' 10646' 8943' COMPLETION i DEPTH INTERVAL(MD AMOUNT AND KIND OF MATERIAL USED 11112' 8936' 11295' 8933' i BlafQ 2375' Freeze Protect w/74 Bbls Diesel 11607' 8942' VW) I 11832' 8942' 12394' 8936' 12697' 8930' 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No• Sidewall Core(s)Acquired? 0 Yes IS No • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBDMS APR 2 5 2013) IT Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit Original Only i(Ir i)�/ , 4( qt7(/, c z ,/ 6 29. GEOLOGIC MARKERS(List all formations and m- ' -.rs encounter 30. FORMATION TESTS NAMETVDTVD Well Tested? L s ®No _ Permafrost Top 40' 40' If yes,list intervals and formations tested,briefly summarizing test Permafrost Base 1922' 1846' results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Ungu 3649' 3163' None Schrader Bluff N 5405' 4553' Schrader Bluff 0 5603' 4732' Base of Schrader Bluff 5994' 5085' HRZ 7530' 6489' Kalubik 7576' 6531' Kuparuk C 7640' 6590' LCU/Kuparuk B 7690' 6635' Kuparuk A 7717' 6659' Miluveach 7771' 6708' Kingak 8497' 7355' Sag River 9861' 8597' Shublik 9891' 8625' Eileen 10021' 8735' Ivishak/Zone 4 10071' 8772' Ivishak/Zone 3 13300' 8977' Formation at Total Depth: Ivishak/Zone 3 • 13300' 8977' 31.List of Attachment: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Zach Browning;564-4664 Email: Zachary.Browning@bp.com Title: Drilling Technologist Printed Name: •- .-stufk Signature: j - Phone 564-4091 Date: At'/I Gfi5 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only -7F11 E ` 4-1116' CNV WELLFEAD= FMD ACTUATOR= 6 6 SAFE /TES_ WELL ANGLE>70°@ 10313 *** ELECTRIC CHROME TBG&LNR*** NTFAL KB.ELEV= 96.01' / NT1 ' AL.BF.ELEV= 56.2 KOP= 300' Max Angle= 96°@ 10660' , 1995' 14-1/2'HES X NP,ID=3.813" Datum M:),= 10301 20"CONDUCTOR,94#,H-40,D=19.124" H '-108GAS LIFT MANDRELS 9-5/8'CSG,40#,L-80 BTC,D=8.835" 3601' ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 3839 3308 38 KBG DCK BEK - 03/22/13 6 5442 4587 26 KBG DMY BK 0 03/22/13 5 6388 5445 24 KBG DMY BK 0 03/22/13 4 7085 6082 24 KBG DMY BK 0 03/22/13 Minimum ID = 3.813" @ 1995' 3 7782 6718 26 KBG DMY BK 0 03/22/13 4-1/2" HES X NIPPLE 2 8810 7633 26 KBG DMY BK 0 03/22/13 1 9466 8234 23 KBG DMY BK 0 03/22/13 I 9602' H4-1/2'HES X NP,13=3.813' 9531' -14-1/2"SGM NDPG SINGLE DROP SAPPHIRE GAUGE,D=3.864" 11 9565' _17"X 4-1/2"HES TNT PKR 13=3.856" 9600' H 4-1Q"HES X NP,ID=3.813" 111 • 9676' -4-1/2"HES X NP,D=3.813' 9682' -17'X 5"BKR HRD-E ZX PN LIP,D=4.32' 4-1/2'TBG, 12.6#,13CR-85 VAM TOP, -{ 9687' CI 9688' -14-1/2"WLEG,D=4.00 .0152 bpf,ID-3.958" --I\ ELM)TT NOT LOGGED \ 9703' -17'X 5'BKR FLEX-LOCK HGR D=4.36" 7"CSG,26#,L-80 VAM TOP HC, .0383 bpf, -H 9859' • 9712' H5'X 4-1/2'XO BUSHING,D=3.870' ID=6.276(BTM 2 JOINTS=L-80 BTC) •• HES OBM SWELL PACKBtS in No I HES XXD SLD SLV,ID=3.813" ' NO SIZE TOP DE'TH MND .7.1 .7. NO DEPTH OIC DATE 7 4-1/2" 10038 3958" _ 10 10126 C 03/21/13 6 4-1/2" 10261 3.958" �-� 9 10326 C 03/21/13 5 4-1/2' 10420 3.958" .-.1111..:. 8 10646 C 03/21/13 4 4-1/2" 10861 3.958" AMA 7 11112 C 03/21/13 3 4-1/2" 11467 3.958" 6 11295 C 03/21/13 2 4-1/2' 12124 3.958' IIIII 5 11607 C 03/21/13 1 4-1/2' 12910 3.958" mumau 4 11832 C 03/21/13 MIMI 3 12394 C 03121/13 _, 2 12697 C 03/21/13 II 1 13100 C 03/21/13 PBTD:4-1/2"BKR ISOLATION VALVE,D=1.250' 13260' m No• O=OPEN C=CLOSED .-- 13238' H4-1/2"BKR SHFT TOOL V ERFICATION SUB,D=3.920' 4-1/2"LNR, 12.6#.13CR-80 HYD 521. H 13263' amm• .0152 bpf,ID=3.958' 13260' H4-1/2"BKR ISOLATION VALVE,D=1.250' 3-1/2"LNR 9.2#,13CR-85 VAM TOP, ---I 13362' 13263'1H4-1/2"X 3-1/2"XO,ID=2.960" .0087 bpf,D=2992' 13274' -3-1/2'HES OBM SWELL PKR,D=2.992' 4-112'LNR, 12.6#,L-80 BT,.0152 bpf,ID=3.958" - 13384' 13362' H3-1/2'X 4-1/2'XO,D=2.992" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/25/13 D-14 INT1AL COMPLETION WELL: Z-66 03/28/13 PJC DRLG HO CORRECTONS PERMIT No:'2121950 03/31/13 RP/PJC ADD ACTUATOR API No: 50-029-23482-00 04/08/13 ZI-B/PJC FINAL APROVAL ODE SEC. 19,T11N,R12E,985'FN.&2137'FWL 04/15/13 JNUJMD PBTD CORRECTION BP Exploration(Alaska) BP AMERICA LOT / FIT Summary Well Name: Z-66 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 03/05/13 FIT 3,601.00 3,126.00 9.00 860.00 2,321.51 14.30 03/12/13 FIT 8,883.00 7,699.49 8.80 1,650.00 5,169.77 12.93 Page 1 of 1 North America-ALASKA-BP Page 1 of 22 Operation Summary Report Common Well Name Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011 MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor.DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code , NPT NPT Depth Phase Description of Operations (hr) (usft) 2/20/2013 18:00 - 00:00 6.00 MOB P PRE PREPARE TO ROMO Z-61 TO WELL Z-68, 2/21/2013 19:30 - 00:00 4.50 MOB P PRE POSITION SUB ON MATS -UNHOOK SOW AND CATS -REMOVE JEEP FROM SUB CRAB SUB OVER WELL AND SPOT -POSITION MATS FOR PIPE SHED -MOVE PIPE SHED F/Z-61 TO Z-66 AND SET. 00:00 - 06:00 6.00 MOB P RUNCMP WALK POWER,PUMP,AND PUMP COMPLEXES OUT -LOWER CATTLE SHUTE AND HATCH INTO PIPE SHED -PREP AND SKID FLOOR 06:00 - 08:00 2.00 MOB P RUNCMP LOWER DERRICK 08:00 - 12:00 4.00 MOB P RUNCMP UNPIN PIPESHED AND WALK 20',LATCH TO TRUCK AND REPOSITION W/SAME 12:00 - 16:30 4.50 MOB P RUNCMP INSTALL JEEP ON SUB AND MOVE SUB F/Z-61 TO Z-66.UNABLE TO PULL SUB ONTO MATS. 16:30 - 19:30 3.00 MOB N WAIT -0.90 PRE WAIT ON PEAK CAT.R/U TWO CATS TO PULL SUB ONTO MATS. 2/22/2013 00:00 - 07:30 7.50 MOB P PRE CONTINUE TO MOVE IN AND SPOT REMANING MODULES ON Z-66 07:30 - 10:00 2.50 MOB. P PRE RAISE DERRICK AND SKID FLOOR 10:00 - 12:00 2.00 MOB P PRE WALK PITS,PUMP,AND PIPE SHED MODULES INTO PLACE 12:00 - 18:00 6.00 MOB P PRE MOVE MOTOR MODULE INTO PLACE-RAISE CATTLE SHUTE-TEST ESD ON GENERATORS 18:00 - 21:00 3.00 MOB P PRE MAKE UP INTERCONNECTS -RU ALL STAIRWAYS,LANDINGS,POWER CABLES,STEAM ETC 21:00 - 00:00 ' 3.00 MOB N RREP -0.90 PRE UNABLE TO SCOPE UP DERRICK TROUBLESHOOT ELECTRICAL PROBLEM ON AMPHION DRAWWORKS CONTROLS 2/23/2013 00:00 - 02:00 I 2.00 MOB N RREP -0.90 PRE UNABLE TO SCOPE UP DERRICK TROUBLESHOOT ELECTRICAL PROBLEM ON AMPHION DRAVWVORKS CONTROLS. 102:00 - 15:00 13.00 RIGU P PRE NU RISER AND BOPE. 15:00 - 00:00 9.00 RIGU N RREP -0.90 PRE UNABLE TO SCOPE UP DERRICK TROUBLESHOOT ELECTRICAL PROBLEM ON AMPHION DRAWWWORKS CONTROLS. -HELD Z-66 PRE-SPUD MTG WITH CREW 2/24/2013 00:00 - 01:00 1.00 RIGU P PRE HELD Z-66 PRE-SPUD MTG WITH CREW 01:00 - 02:30 1.50 RIGU N RREP -0.90 PRE GENERAL HOUSEKEEPING. 02:30 - 03:00 0.50 RIGU P PRE HOLD RIG EVACUATION DRILL -CONDUCT AAR W/CREW 03:00 - 00:00 21.00 RIGU N RREP -0.90 PRE UNABLE TO SCOPE UP DERRICK TROUBLESHOOT ELECTRICAL PROBLEM ON AMPHION DRAWINORKS CONTROLS. -SIMOPS: -CLEAN TANK ROOM -REPLUMB JET LINES -COMPLETE PM'S -INSPECT MUD PUMPS -REPLACE HYDRAULIC GEAR BOX ON JIB CRANE Printed 4/8/2013 11:07:06AM North America-ALASKA-BP Page 2 of 22 Operation Summary Report `' `n ' Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 1 End Date: X3-011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PBZ Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To 1 Hrs 1 Task Code 1 NPT NPT Depth I Phase 1 Description of Operations (hr) I (usft) - 2/25/2013 00:00 - 10:00 10.00 1 RIGU N RREP -0.90 PRE I UNABLE TO SCOPE UP DERRICK.CONTINUE TROUBLESHOOT ELECTRICAL PROBLEM ON AMPHION DRAWWORKS CONTROLS '-ENERGIZE KOOMEY UNIT -CHECK FOR LEAKS,VERIFY KNIFE VALVE OPERATION -TEST GAS ALARMS GENERAL HOUSEKEEPING AND MAINTENANCE 10:00 - 12:00 2.00 RIGU N RREP -0.90 PRE UNABLE TO SCOPE UP DERRICK.CONTINUE TROUBLESHOOT ELECTRICAL PROBLEM ON AMPHION DRAWWORKS CONTROLS -PERFORM ACCUMULATOR DRAWDOWN TEST,BEFORE 3,050'PSI/AFTER 2,150 PSI 10 SEC FOR 200 PSI BUILD W/2 ELEC PUMP, 46 SEC FOR FULL PRESSURE BUILD WITH 2 ELEC AND 2 AIR PUMPS. FUNCTION TESTANNULAR(ANN CLOSE=35 'SEC,KNIFE VALVE OPEN=13 SEC) -WITNESS WAIVED BYAOGCC REP JEFF JONES. 12:00 - 17:00 5.00 RIGU N RREP -0.90 PRE UNABLE TO SCOPE UP DERRICK.CONTINUE TROUBLESHOOT ELECTRICAL PROBLEM ON AMPHION DRAVWVORKS CONTROLS 1-CONT GENERAL HOUSEKEEPING AND RIG MANITENANCE 17:00 - 00:00 7.00 RIGU P PRE ;RIG ACCEPTED @ 20:30 HR$ -DRAWWORKS OPERATIONAL,BRIDAL UP AND SCOPE UP DERRICK RU KELLY HOSE AND PLUG IN DERRICK LIGHTS CUT/SLIP 105'DRLG LINE,RECALIBRATE BLOCK HEIGHT 2/26/2013 00:00 - 01:00 1.00 RIGU P PRE PJSM,C/O PS-21 SLIP INSERTS 01:00 - 04:30 3.50 RIGU P PRE I PU/MU AND STAND BACK 5 STDS 4"HWDP,5" i JAR STD IN DERRICK 04:30 - 06:30 2.00 RIGU P PRE PU/MU MUD MOTOR,12 1/4' BIT AND ORIENT UBHO W/MOTOR -FILL STACK VERIFY "NO LEAKS". 08:30 - 07:30 1.00 RIGU P PRE RIG UP GYRO DATA 07:30 - 08:00 0.50 RIGU P PRE TEST MUD LINES 3,500 PSI,OK -VERIFY OPERATION OF CUTTINGS TANK DRAIN LINE AND JETS. 08:00 - 09:00 1.00 DRILL P SURF I RIH W/BIT TAG @ 110'MD, DRILL 12 1/4"SURFACE HOLE F/110'TO 127' SMD 1-8.6 PPG DRIL-PLEX MUD -450 GPM,300 PSI, -40 RPM,1-5 KTQ 09:00 - 11:00 2.00 DRILL N DPRB 127.00 SURF -RUN GYRO,TOOL STUCK IN UBHO,DISCUSS OPTIONS,PULL TOOL FREE -POOH W/GYRO TOOL,C/O STINGER AND CENTRALIZER RIH W/GYRO,NEW STINGER,NEW CENTRALIZER.NO PROBLEM Printed 4/8/2013 11:07:06AM Pa a 30 22 . o Fh tnenca ati<A-BP Page Operation Summary Report Common Wet Name.2-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code . NPT j NPT Depth Phase Description of Operations (hr) i I (usft) 11:00 - 12:00 1.00 DRILL P SURF DRILL 12 1/4"SURFACE HOLE F 127'TO 200' MD -450 GPM,400 PSI,ON/350 PSI OFF -8.6 PPG MUD WT -40 RPM,1-2 K TQ -5K WOB -P/U 44K,S/0 53K,ROT 45K -ART=1.52,ADT=1.52,TOT BIT HRS=1.52 12:00 - 18:00 6.00 DRILL P SURF DRILL 12 1/4"SURFACE HOLE F/200'TO 313' MD(312'TVD) 450 GPM,450 PSI ON/375 PSI OFF -8.6 PPG MUD WT I-40 RPM,1-2 KTQ -5/8KWOB -P/U 45K,S/0 45K,ROT 45K -AST=2.12,TOT BIT HRS=3.64 DRILLING WITH DOUBLES FROM PIPE SHED. 18:00 - 19:00 1.00 DRILL P SURF POOH WITH BHA#1.STD BACK 4"HWDP,LD XO AND UBHO -MONITOR DISP VIA TT 19:00 - 22:00 3.00 DRILL P SURF MU BHA#2 AS PER SLB DD,ORIENT UBHO, — — RIH W/BHA#2 22:00 - 00:00 2.00 DRILL SURF DRILL 12 1/4"SURFACE HOLE F/ 313'MD TO 376'MD(375'TVD) -500 GPM,840 PSI ON/770 PSI OFF 8.6 PPG MUD WT -40 RPM,2-3 KTQ ON BTM, 1K TQ OFF BTM -10K WOB -P/U 56K,S/O 77K,ROT 60K -AS=.32,ART=.55 ,ADT=.87,TOT BIT HRS =4.51 -TOT JAR HRS=.87 MWD INDICATING CLEAN SURVEYS FROM 307'MD. PLAN IS TO KEEP GYRODATA RIGGED UP UNTIL PAST POSSIBLE AREA OF MAGNETIC INTERFERENCE FROM 900'MD TO +1400'MD. 2/27/2013 00:00 - 13:00 13.00 DRILL P SURF DRILL 12 1/4"SURFACE HOLE F/376'MD TO 1260'MD(1244'TVD) -550 GPM, 1390 PSI ON/1240 PSI OFF -8.9PPG MUD WT -40 RPM,7 KTQ ON/2K TQ OFF -32K WOB -P/U 45K,S/O 45K,ROT 45K -AST=3.8,ART=2.41,ADT=6.21,TOT BIT FIRS=10.72 JAR HRS=6.9 GYRO SURVEYS EVERY 63'. DRILLING WITH DOUBLES FROM PIPE SHED CURRENTLY OBTAINING CLEAN MWD 1 'SURVEYS. GYRODATA REMAINS RIGGED UP AND READY TO RUN IN ANTICIPATION OF POSSIBLE AREA OF INCREASED MAGNETIC INTERFERENCE FROM-900'MD.TO+1400' II MD. WHEN PAST+1400'MD.,PLAN IS TO OBTAIN AS YET UNDETERMINED NUMBER OF CLEAN MWD SURVEYS AND THEN RELEASE 1 GYRODATA SERVICES. Printed 4/8/2013 11:07:06AM • North America-ALASKA-BP Page 4 of 22 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011MR-C:DRILL(9,245,086.00) Project Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Tme:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UVN: Active datum:Z-66 actual©96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 00:00 11.00 DRILL P SURF DRILL 12 1/4"SURFACE HOLE F/1127'MD TO 1,260'MD(1244'TVD) -550 GPM, 1640 PSI ON/1440 PSI OFF -8.9PPG MUD WT -40 RPM,6 K TQ ON/2K TQ OFF -32K WOB l i -P/U 92K,S/0 92K,ROT 90K -AST=2.93,ART=2.69,ADT=5.62,TOT BIT HRS=16.32 -JAR HRS=13.1 GYRO SURVEYS EVERY 63'. DRILLING WITH DOUBLES FROM PIPE SHED CURRENTLY OBTAINING CLEAN MWD SURVEYS. GYRODATA REMAINS RIGGED UP AND READY TO RUN IN ANTICIPATION OF POSSIBLE AREA OF INCREASED MAGNETIC INTERFERENCE FROM-900'MD.TO+1400' MD. WHEN PAST+1400'MD.PLAN IS TO OBTAIN AS YET UNDETERMINED NUMBER OF CLEAN MWD SURVEYS, -RIG DOWN AND RELEASE GYRODATA • SERVICES la 16:30 HRS,1380'MD AFTER OBTAINING VERIFIABLE CLEAN SURVEY 2/28/2013 00:00 - 03:00 3.00 DRILL P SURF "DRILL 121/4"SURFACE HOLE F/ 1840'MD TO 2076 MD(1977'TVD) -550 GPM, 1640 PSI ON /1440 PSI OFF -8.9PPG MUD WT -40 RPM,6 KTQON/2KTQOFF -32KWOB-P/U92K, S/0 92K,ROT 90K -AST=0.57 ,ART=0.69, ADT=1.26 ,TOT BIT HRS=17.58-JAR HRS= 14.36 03:00 - 04:00 1.00 DRILL P SURF CIRCULATE BOTTOMS UP -ROTATE AND RECIPROCATE PIPE DURING 1ST BTMS UP - HOLD MOTOR TO HIGH SIDE -RECIPROCATE PIPE FOR REMANING 2X BTMS UP. 04:00 - 06:00 2.00 DRILL P ; SURF POOH ON ELEVATORS F/2076'MD TO 900'MD -FLOW CHECK WELL 06:00 - 11:30 5.50 DRILL P SURF RACK BACK BHA#2-RACK BACK 4"HWDP AND 5"HWDP JARS AND COLLARS -LD UBHO -PU NEW VM-3 HUGHES INSERT BIT- ADJUST MOTOR BEND TO 1.5' BIT GRADE:02-04-WT-A-E-3/8-SS-BHA 11:30 - 12:30 1.00 DRILL P SURF SERVICE AND INSPECT TOP DRIVE 12:30 - 13:30 1.00 DRILL P SURF RIH W/BHA#3 TO 840'ON ELEVATORS 13:30 - 14:00 0.50 DRILL P SURF PERFORM MWD SHALLOW HOLE TEST-500 GPM,990 PSI(GOOD DETECTION) 14:00 - 17:00 3.00 DRILL P SURF RIH TO TIGHT SPOT AT 1,260'MD -UNABLE TO MOVE DOWN WITHOUT PUMPS AND ROTATION -NOTIFY 04040DE,WTL, SUPERINTEDENT AND DISCUSS PLAN FORWARD 17:00 - 19:00 2.00 DRILL N DPRB 1,408.00 SURF ORIENT TOOL FACE PER TOWN DISCUSSION AND BEGIN SIDE TRACK NEW 12-1/4"HOLE FROM 1,260'MD TO 1,408'MD,1,385'TVD - 550 GPM,1,475 PSI ON/1,310 PSI OFF- 10-30K WOB-P/U 82K,S/0 82K ROT 90K-AST =0.57 ,ART=0.69,ADT=1.26 ,TOT BIT HRS =17.58 Printed 4/8/2013 11:07:06AM • • North America-ALASKA-BP Page 5 of 22 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011 MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 20:30 1.50 DRILL N DPRB 1,126.00 SURF POOH ON ELEVATORS FROM 1,408'MD TO 1,126'MD-WIPED THROUGH AREA AT 2160' 2X,NO OVER PULL OR SLACK OFF SEEN -TIGHT SPOT AT 1,160'MD(15K OVERPULL)- WORKED THROUGH TIGHT SPOT,WIPED 1X- RIH TO BOTTOM AT 1,408' MD,NO PROBLEMS SEEN AT 2160'MD ON RIH- OBTAIN SURVEY AT 1408' 20:30 - 00:00 3.50 DRILL N DPRB 1,696.00 SURF OBTAIN SURVEY AT 1408-CONT DRILL SIDE TRACK 12 1/4"HOLE F/ 1,408'MD TO 1,696' MD(1,651'TVD)-550 GPM,1530 PSI ON/1400 PSI OFF-9.2 PPG MUD WT-40 RPM,4K-5K TO ON/2.5K TQ OFF-23K WOB-P/U 90K, S/O 89K,ROT 89K-AST=2.75 ,ART=0.54, 1 ADT=3.29 ,TOT BIT HRS=3.29-JAR HRS= 18.0 3/1/2013 00:00 - 05:00 5.00 DRILL N DPRB 2,076.00 SURF DRILL 12-1/4"SURFACE HOLE F/ 1696'MD TO f 2,076'MD(1,968'ND) -550 GPM, 2740 PSI ON/2540 PSI OFF -9.2 PPG MUD WT -40 RPM,5K TO ON/3K TQ OFF - 20/30K WOB -P/U 88K,S/O 90K,ROT 89K AST=2.33 ,ART= 2.50,ADT=4.83,TOT BIT HRS=8.12 -JAR HRS=23.2 _ ✓ 05:00 - 12:00 7.00 DRILL P SURF DRILL 12-1/4"SURFACE HOLE F/2,076'MD TO 2,713 MD (2,457 TVD) -700 GPM, 2740 PSI ON/2540 PSI OFF -9.2PPG MUD WT -40 RPM,6K TQ ON/2K TQ OFF - 32K WOB -P/U 92K,S/O 92K,ROT 90K -AST=0.57 ,ART=0.69,ADT=1.26 ,TOT BIT HRS=17.58 -JAR HRS=14.36 ENCOUNTERED HYDRATES AT 2,643'MD -CARRIED EXCESS CUTTINGS TO SURFACE -FLOWLINE BEGIN TO PACKOFF -CLEAR FLOW LINE -GAS CUT=8.3 PPG ON MUD BALANCE (UNPRESSURIZED) 12:00 - 23:00 11.00 DRILL P SURF DRILL 12-1/4"SURFACE HOLE F/2,713'MD TO 3,611'MD (3,134 ND) -750 GPM, 2740 PSI ON/2540 PSI OFF -9.3 PPG MUD WT -80 RPM,6K TO ON/5K TQ OFF - 20K WOB -P/U 117K,S/0 99K,ROT 105K -AST=0..42 ,ART=3.66,ADT=1..08,TOT BIT HRS=12.2 -JAR HRS=27.28 ENCOUNTERED HYDRATES AT 3,440'MD -CIRCULATED OUT WITH NO GAS CUT, OBSERVED EXCESS CUTTINGS 23:00 - 00:00 1.00 DRILL P SURF CBU 3X W/RECIPROCATION AND ROTATION F/3,611'MD T/3,526'MD -750 GPM,3100 PSI -80 RPM,4K-5K TO Printed 4/8/2013 11:07:06AM North America-ALASKA-BP Page 6 of 22 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay t Site:PB Z Pad Rig Name/No.:DOYON 25 1 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UW: Active datum:Z-66 actual©96.10usft(above Mean Sea Level) Date From-To Hrs I Task 1 Code I NPT NPT Depth ' Phase j Description of Operations (hr) (usft) 3/2/2013 00:00 - 00:30 0.50 DRILL P SURF CONT TO 3X CBU W/RECIPROCATION AND ROTATION F/3,611'MD T/3,526'MD -750 GPM,3100 PSI -80 RPM,4K-5K TQ 00:30 - 01:00 0.50 DRILL P I i SURF FLOW CHECK WELL(STATIC) 01:00 - 03:00 2.00 DRILL P SURF POOH ON ELEVATORS F/3,611'MD T/1,220' .MD -PULLED 40'ABOVE SIDETRACK DEPTH- - NO TIGHT SPOTS OBSERVED 03:00 - 04:00 1.00 DRILL P SURF RIH ON ELEVATORS F/1,220'MD T/3,611'MD -NO TROUBLE SPOTS ENCOUNTERED. 04:00 - 05:30 1.50 DRILL P SURF CBU WHILE ROTATING AND RECIPROCATING F/3,611'MD T/3,526'MD -750 GPM,3100 PSI -80 RPM,4K TQ 05:30 - 06:00 0.50 DRILL P SURF MONITOR WELL(STATIC) 06:00 - 08:30 I 2.50 DRILL P SURF POOH ON ELEVATORS F/3,594'MD T/283 08:30 - 10:30 ' 2.00 DRILL P SURF L/D BHA BHA#3 PER SLB DD 10:30 - 11:30 1.00 DRILL P SURF LD STAB,XO'S,BIT AND CLEAR AND CLEAN RIG FLOOR, 11:30 - 15:00 3.50 CASING P SURF RU TO RUN 9 5/8"CASING,C/O BAILS,PU BAIL EXTENSIONS, -PU FLUTED HGR AND PERFORM DUMMY RUN AND MARK,LD SAME. 15:00 - 22:00 7.00 CASING P SURF HELD AAR AND PJSM ON 9 5/8"CASING RUN AND VOLANT TOOL OPERATION -RUN 9 5/8"40#L-80 SURFACE CASING -MU SHOE TRACK AND CHECK FLOAT EQUIPMENT,OK -RUN CASING TO 2138'(53 JTS RAN)FILL PIPE EVERY JT, -BREAK CIRC AND WASH DOWN EVERY 10TH JT STAGING FROM 3 TO 5 BPM. I-C/O JT#27 AND COLLAR ON JT#26 DUE TO GALLED THREAD.NO CHANGE TO PIPE TALLY LENGTH. 22:00 - 22:30 0.50 CASING P SURF SERVICE PS-21 SLIPS, -CIRC AT 2 BPM 22:30 - 00:00 1.50 CASING I N I RREP ' 2,138.00 SURF PS-21 SLIPS NOT FUNCTIONING, BROKE FITTING,REMOVE FROM ROTARY TABLE TO REPAIR. -CIRCULATE AT 2 BPM,AND RECIPROCATE PIPE SLOWLY W/10'STROKE 3/3/2013 00:00 - 01:30 1.50 CEMT N RREP SURF CHANGE OUT SLIPS 01:30 - 05:30 4.00 CASING P SURF CONT RIH W/9-5/8",40#,L-80,BTC,CASING F/ 2135'MD TO 3560 MD.FILL PIPE EVERY 5 JTS, CIRC EVERY 10 JTS. MU HANGER -WASH DOWN AND LAND ON DEPTH©3601' MD 05:30 - 08:30 3.00 CASING P I SURF CIRC/COND MUD WHILE RECIPROCATE PIPE F/3601'MD TO 3585'MD, -STAGE PUMPS UP TO 7 BPM,200 PSI Printed 4/8/2013 11:07:06AM • 41) # � � . North America-ALASKA-BP s � Page ,-' Pas e7o' f 22 ' Aa rz . # �. " l• �z4> re '',f,,'•,‘.:', A1,.> � � � ,'"w.. FYV�3 0 � e���e - v, ,, Operation Summary Report , Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011MR-C:DRILL(9,245,086.00) I (— Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) i 08:30 - 14:30 1 6.00 CASING P SURF RU CEMENT LINE AND PJSM CEMENT 9-5/8"SURFACE CASING AS -_ FOLLOWS: -PJSM FOR 9-5/8"CEMENTING WITH II I SCHLUMBERGER AND CH2MHILL I-LINE UP TO SCHLUMBERGER CEMENTERS. I I . -PUMP 05-BBLS OF WATER,TEST LINES TO 300/3500 PSI,OK. -PUMP 100 BBLS OF 10.0-PPG MUDPUSH II. I- DROP BOTTOM PLUG �-PUMP 737-BBLS(2189 SX)11.0-PPG LEAD CITECRETE CEMENT.YIELD 1.89 CUFT/SK PUMP 87-BBLS(422 SX)15.8-PPG CLASS"G" II TAIL CEMENT.YIELD 1.16 CUFT/SK I-DROP TOP PLUG.KICK OUT PLUG WITH 10-BBLS OF WATER. -SWITCH OVER TO RIG PUMPS FOR DISPLACEMENT -DISPLACE WITH 9.4 PPG DRILPLEX MUD II-PUMP AT 8 BPM,WITH 420 PSI -SIDEWALK CEMENT BACK TO SURFACE @ I 11400 STKS DISPLACED SIDEWALK CEMENT BACK TO SURFACE 112 BBLS -TOTAL CEMENT BACK TO SURFACE 125 BBLS SHUT DOWN DUE TO JOES BOX AND FLOWLINE PLUGGED BY CUTTINGS AND ' I CONTAMINATED MUD JET AND CLEAR SAME -STAGE PUMPS UP TO 6 BPM,640 PSI PUMP MAX ALLOWABLE STKS 2582(DISP+ 1/2 SHOE TRACK), DID NOT BUMP PLUG I -SHUT DOWN,BLEED PRESSURE,_CHECK I I FLOATS,OK _ I -CIP @ 14:30 HRS i 14:30 - 00:00 9.50DIVRTR 1 P SURF RIG DOWN 9 5/8"CASING RUNNING TOOLS& DIVERTER SYSTEM DRAIN&RINSE STACK,WASH ALL SURFACE EQUIPMENT EXCESSIVE CEMENT IN FLOWLINE AND DRIP PAN TO CLEAN OUT I-RIG DOWN CEMENT HEAD,CEMENT LINES, 1350-TON ELEVATORS. CLEAR FLOOR OF CASING EQUIP. -PULL LANDING JOINT RINSE JOE'S BOX AND PULL OUT OF OPERATING POSITION. -PULL LOW PRESSURE RISER. FUNCTION,RINSE,AND NIPPLE DOWN 21-1/4"ANNULAR DIVERTER PULL SURFACE RISER&SEND OUT THE BEAVER SLIDE. 1-R/D DIVERTER LINE AND KNIFE VALVE. -CLEAN MUD PITS,TROUGH AND FLOW LINE. GAVE AOGCC 24 HOUR NOTIFICATION OF . I UPCOMING BOP TEST AT 16:30 HRS 3/4/2013 I 00:00 - 09:00 9.00 BOPSUR P SURF NU BOPE -:-NU CASING HEAD,,TUBING SPOOL,HIGH PSI i !RISER,AND BOP STACK _ Printed 4/8/2013 11:07:06AM i North America-ALASKA-BP Page B of 22," Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date X3-011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM r Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth , Phase Description of Operations (hr) __ (usft) 09:00 - 16:00 7.00 BOPSUR P SURF TEST BOPE PER BP/AOGCC/DDI REQUIREMENTS TO 250-PSI LOW/3500-PSI HI. TESTED 2-7/8"X 5-1/2"UPPER VBR'S AND LOCKS,2-7/8"X 5-1/2"LOWER VBR'S AND LOCKS WITH 4" TEST JT.TESTED BLIND SHEAR RAMS 250-PSI LOW/3500-PSI HI,2 EA.OF 4-1/2"IF FOSV'S, 1 EA.OF 4"DART VALVE&FOSV.TESTED CHOKE MANIFOLD VALVES 1-15,CHOKE AND KILL MANUAL& HCR VALVES,4"KILL LINE VALVE&UPPER AND LOWER TOP DRIVE IBOP'S. TESTED MANUALAND SUPER CHOKES TO 250-PSI LOW/3500-PSI FOR 5 CHARTED MINUTES EACH TEST. TESTED ANNULAR PREVENTER WITH 4" TEST JT.250-PSI LOW/3500-PSI HI. CHARTED ALL HI AND LO TESTS FOR 5-MINUTES EACH. "FIRST 5"FOSV PT(FAILED),PICKED UP SPARE PT(PASS) - CLOSING TIMES: -BLIND/SHEARS=17 SEC UPPER VBR'S=15 SEC LOWER VBR'S=15 SEC 'ANNULAR=24 SEC HCR KILL=2 SEC HCR CHOKE=2 SEC PERFORMED ACCUMULATOR DRAWDOWN TEST: -ACCUMULATOR PSI=3050,MANIFOLD PSI= 1550 -ACCUMULATOR PSI AFTER FUNCTIONING BOPE=1700-PSI -RECOVERY TO FULL SYSTEM PRESSURE= 2-MINUTES 54-SECONDS. -6 NITROGEN BOTTLES AVERAGE PRESSURE=2050-PSI REFERENCED DDI BOP TESTING SOP FOR ALL TESTING. BOPE TEST WITNESSED BY AOGCC-CHUCK SHEVE,DOYON i TOOLPUSHER-SAM DYE,AND BP WSL-MIKE HEFLEY 16:00 - 16:30 0.50 BOPSUR P SURF INSTALL 9"WEAR BUSHING 16:30 17:00 0.50 BOPSUR P SURF SERVICE TOP DRIVE 17:00 - 17:30 0.50 BOPSUR N RREP SURF C/O VALVE BLOCK ON TOP DRIVE 17:30 - 00:00 6.50 BOPSUR P SURF SINGLE IN W/ MULESHOE AND 4"DP AND STAND BACK 3/5/2013 00:00 - 02:00 2.00 CEMT P SURF RIH W/4"DP.POH STAND BACK. 02:00 - 04:00 2.00 CEMT P SURF PRESSURE TEST 9-5/8"CASING ✓ -250 PSI/3,500 PSI FOR 5/30 MIN CHARTED (PASS) 04:00 - 08:00 4.00 CEMT P SURF MU BHA#4 PER SLB DD LOAD SOURCE PER MWD 08:00 - 08:30 0.50 CEMT P SURF i SHALLOW HOLE TEST AT 684'MD(GOOD) 08:30 - 10:00 1.50 CEMT P SURF I SERVICE TOP DRIVE Printed 4/8/2013 11:07:06AM Page 9 of 22 North America-ALASKA-BP Operation Summary Report Common Well Name Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011 MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM 1 Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UW: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 12:00 2.00 CEMT P SURF RIH F/684'MD T/3,463'MD -TAGGED TOP CEMENT PLUG AT 3,463'MD 12:00 - 14:30 2.50 CEMT P i SURF CONT RIH F/3,463'MD TO 3,479'MD -200 GPM,980 PSI 4 -SLACKED OFF WITHOUT ROTATION 14:30 - 15:00 0.50 CEMT P SURF i WASH AND DRILL F/3,479'MD TO 3,591'MD TAGGED FC ON DEPTH AT 3,515', -450 GPM,2170 PSI,2K WOB -40 RPM,7-8K TO 15:00 - 15:30 0.50 CEMT P SURF DISPLACE WELL TO NEW 9.0 PPG LSND MUD -450 GPM,1230 PSI -40 RPM, 15:30 - 16:30 1.00 DRILL i P I SURF DRILL OUT REMAINING SHOE TRACK AND 20' OF NEW FORMATION FROM 3,591'TO 3.631' -450 GPM,2170 PSI -40 RPM,7-8K TQ -TAGGED FLOAT COLLAR AND CASING SHOE I ON DEPTH SPR'S AT 3,601'MD(3127'ND),TIME 15:30, MW 9.0 PPG #1 MP-20/30 SPM=200/250 PSI #2 MP-20/30 SPM=200/250 PSI 16:30 - 17:30 1.00 DRILL P SURF CBU 2X -470 GPM,1230 PSI -RU FOR LOT 17 30 - 18.30 1.00 DRILL P SURF PJSM FOR LOT OPERATIONS PULL UP INTO THE 9-5/8"SHOE AND, PERFORM FIT PERFORM FIT TO 14.3 EMW -ODE APPROVAL TO CONTINUE OPERATIONS WITH A GREATER THAN 50 BBL KICK TOLERANCE MONITOR WELL FOR 10 MIN-WELL STATIC _ I -MW IN-9.0 PPG,MW OUT-9.0 PPG 18.30 - 19:30 1.00 DRILL P INTI DRILL 8.75"INTERMEDIATE HOLE F/3,631'MD T/3,775'MD 19:30 - 21:00 . 1.50 DRILL N DFAL 3,775.00 INTI RESISTIVITY TOOL LOCKED UP. -TROUBLE SHOOT PROBLEM,AND ABLE TO UNLOCK TOOL -PULL BACK TO SHOE, -MAD PASS T/3,775'MD 21 00 - 00:00 3.00 DRILL P INTI DRILL 8.75"INTERMEDIATE HOLE F/3,775'MD T/4,107'MD 3,515'ND -582 GPM,1940 PSI ON/1740 PSI OFF -MW 9.0 IN/9.0 OUT -ECD 9.7 PPG(CALC ECD 9.48 PPG) -80 RPM,6K TQ ON/5K TQ OFF -4-6K WOB -AST=0.47 HRS,ART=1.52,ADT=1.99 HRS, TOTAL BIT HRS -P/U=123K,5/0=105K,ROT=110K 3/6/2013 00:00 - 12:00 12.00 DRILL P INTI DRILL 8.75"INTERMEDIATE HOLE F/4,107'MD T/5,626'MD (4,752'TVD) -580 GPM,2580 PSI ON/2360 PSI OFF -MW 9.3 IN/9.4 OUT ECD 9.7 PPG(CALC ECD 9.76 PPG) -100 RPM,9K TQ ON/8K TQ OFF -8K WOB • L-1 P/U=153K,S/O=121K,ROT=149K Printed 4/8/2013 11.07:06AM North America-ALASKA-BP Page 10 of 22 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date. I X3 011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay I Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs . Task , Code NPT NPT Depth ' Phase Description of Operations (hr) (usft) 12:00 - 00:00 : 12.00 DRILL P INTI 1DRILL 8.75"INTERMEDIATE HOLE F/5,627'MD T/6,860'MD /' -580 GPM,3522 PSI ON/3,180 PSI OFF -MW 10.2IN/10.1+OUT -ECD 11.4 PPG(CALC ECD 10.7 PPG) -100 RPM,11K TQ ON/10K TQ OFF -15K WOB -AST=1.01 HRS,ART=5.56,ADT=6.57 HRS, TOTAL BIT HRS=14.97 -P/U=174K,S/O=130K,ROT=149K 3/7/2013 00:00 - 03:30 ' 3.50 DRILL P INTI I DRILL 8.75"INTERMEDIATE HOLE F/6,910'MD V J TO 7,015'MD -580 GPM,3522 PSI ON/3,180 PSI OFF -MW 10.2 IN/10.1+OUT 03:30 - 04:30 1.00 DRILL N RREP 7,015.00 INTI STALLED MUD MOTOR WHILE MAKING A SLIDE -#1 PUMP PRESSURE RELIEF VALVE WAS TRIGGERED -HAD TO C/O PRV -RESUMED OPERATIONS.OBSERVED -500 PSI DROP IN PUMP PRESSURE -INSPECTED #1 PUMP&FOUND A DISCHARGE VALVE&SEAT WASHED OUT, CIO VALVE AND SEAT 04:30 - 12:00 7.50 DRILL P INTI CONT DRILLING 8.75"INTERMEDIATE F/7,015' ✓ T/7,525'MD(6,484'TVD) -550 GPM,3530 PSI ON/3260 PSI OFF _.. -MW 10.2 IN/ 10.2 OUT -ECD 11.23 PPG(CALC ECD 10.7 PPG) -100 RPM,12K TQ ON/11K TQ OFF 18K WOB -P/U=198K,S/O=136K,ROT=147K 12:00 - 00:00 12.00 DRILL P INTI DRILL 8.75"INTERMEDIATE HOLE F/7,525'MD T/8,285'MD (7,168'TVD) V' -550 GPM,3750 PSI ON/3467 PSI OFF -MW 10.4 IN/10.4 OUT -ECD 11.3 PPG(CALC ECD 10.9 PPG) -80 RPM,11K TQ ON/8K TQ OFF -15K WOB -AST=2.52 HRS,ART=4.64,ADT=7.16 HRS, TOTAL BIT HRS=29.04 -P/U=174K,S/O=146K,ROT=160K 3/8/2013 00:00 - 12:00 12.00 DRILL P INTI CONT DRILLING 8.75"INTERMEDIATE F/8,285' MD T/9,235'MD(8,021'TVD) -530 GPM,3,760 PSI ON/3340 PSI OFF -MW 10.5 IN/ 10.4+OUT -ECD 11.43 PPG(CALC ECD 10.81 PPG) -80 RPM,10K TQ ON/8K TQ OFF -16K WOB P/U=210K,S/O=153K,ROT=172K 12:00 - 21:30 9.50 DRILL P INTI CONT DRILLING 8.75"INTERMEDIATE F/9,235' MD TO (TD)AT 9,863'MD(8,597'TVD) -TSAG AT 9,853'MD,DRILL ADDITIONAL 10' -505 GPM,3,700 PSI ON/3,310 PSI OFF -MW 10.51N/ 10.4+OUT -ECD 11.43 PPG(CALC ECD 10.81 PPG) -80 RPM,10KTQ ON/8KTQ OFF 16K WOB -P/U=234K,S/O=160K,ROT=188K -AST=2.67 HRS,ART=12.72,ADT=15.39 HRS,TOTAL BIT HRS=44.43 Printed 4/8/2013 11:07:06AM North America-ALASKA-BP Page 11 of 22 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011 MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:OOAM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual©96.10usft(above Mean Sea Level) Date From-To Hrs Task Code l NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 00:00 2.50 DRILL INTI CIRCULATE HOLE CLEAN -ROTATING AND RECIPROCATING F!9,859' MD T/9,805'MD j I -500 GPM,3250 PSI,TOTAL 3 X BU -PUMP 30 BBLS HI-VIS SWEEP 3/9/2013 00:00 - 01.00 1.00 DRILL P INTI CONT 3X CBU WHILE ROTATING AND RECIPROCATING F/9,859'MD T/9,805'MD -505 GPM,3250 PSI,80 RPM -TOTAL LOSS DURING CIRCULATION 12 BBLS 01:00 - 01:30 0.50 DRILL INTI 10 MIN FLOW CHECK BEFORE PULLING OFF BOTTOM. -STATIC LOSS RATE AT-8 BPH PUW-238K,SOW-156K,ROT-188K SPR'S AT 9,859'MD(7,227'TVD),TIME 1:15, MW 10.4 PPG #1 MP-20/30 SPM=340/460 PSI #2 MP-20/30 SPM=340/460 PSI 01:30 - 03:00 1.50 DRILL P INTI 'PUMP OUT OF THE HOLE FROM 9,859'MD TO 8,475' -84 GPM,400 PSI -P/U-238K,S/O-156K -PULL ON ELEVATORS FROM 8,475'TO 6,950' 03:00 - 04:30 1.50 DRILL P INTI POOH ON ELEVATORS F/8,475'MDT/6,958' MD 04:30 - 06:00 1.50 DRILL P INTI TIH ON ELEVATORS F/6,958'MD T/9,863'MD 06:00 - 10:00 4.00 DRILL P INTI CIRCULATE WHILE ROTATING AND RECIPROCATING -525 GPM,3350 PSI -100 RPM,15K TQ -PUMPED 4.5X BU UNTIL 9.3 PPG MUD IN AND 9.3 PPG MW OUT _ 10:00 - 11:30 1.50 DRILL P INTI MONITOR WELL -STATIC LOSS RATE:-6 BPH 1-PUMP OUT F/9,863'MD T/8,475'MD 1-80 GPM,410 PSI 11:30 - 12:00 0.50 DRILL P I INTI POOH ON ELEVATORS F/8,475'MD T/7,900' MD _ -NO TIGHT SPOTS OBSERVED WHILE POOH 12:00 - 14:00 2.00 EVAL P INTI MAD PASS PER ODE DISCUSSION AT 350 FT/MIN F/7,900'MDT/7,640'MD -500 GPM,2870 PSI -40 RPM,10K TQ -P/U WT=230K,S/O WT=125K 14:00 - 16:30 2.50 DRILL P INTI POOH ON ELEVATORS F/7,460'MD T/3,533' MD 16:30 - 17:00 0.50 DRILL P INTI ROTATE AND RECIPROCATE F/3,533'MDT/ 3,485'MD -570 GPM,2310 PSI -100 RPM 17:00 - 17:30 0.50 DRILL P INTI PUMP 20 BBL DRY JOB 17:30 - 19:30 2.00 DRILL P INTI POOH ON ELEVATORS F!3,485'MDT/684'MD 19:30 - 23:00 , 3.50 DRILL P INTI LID 5"HWDPAND BHA#4 PER SLB DD -STAND BACK 5"HWDP PJSM FOR REMOVAL OF RADIOACTIVE SOURCE -REMOVE SOURCE PER SLB MWD PROCEDURES. Printed 4/8/2013 11:07:06AM • North Amenca-ALASKA-BP Page 12 of 22 49 „ Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: 1X3-0111\AR-C:DRILL(9,245,086.00) Project:Prudhoe Bay I Site:PB Z Pad Rig Name/No.:DOYON 25 ' Spud Date/Time:2/26/2013 8:00:OOAM Rig Release:3/25/2013 Rig Contractor.DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL P INTI DRAIN STACK,PULL WEAR BUSHING, -INSTALL TEST PLUG,CLEAN AND CLEAR RIG FLOOR TOTAL LOSSES FOR THE DAY 33 BBLS 3/10/2013 00:00 - 01:00 1.00 BOPSUR P INTI I C/O UPPER VBR'S FROM 2-7/8"X 5-1/2" TO 7" CASING RAMS 01:00 - 03:00 1.00 BOPSUR P INTI 'PU 7"TEST JOINT,RU TEST EQUIPMENT TEST RAMS TO 250 LOW/3500 HIGH FOR 5/5 CHARTED MIN EACH(PASS) -UPLOAD TEST CHART TO OPENWELLS 03:00 - 04:00 2.00 CASING P INTI RU TO RUN 7",26#,L-80,VTHC CASING -C/O TOP DRIVE PIPE HANDLER DIES TO 6-5/8" 1-MU DOYON VOLANT CRT 04:00 - 05:30 1.50 CASING P INTI MU SHOE TRACK -BAKERLOCK CONNECTION UP TO LANDING COLLAR -CHECK FLOATS(GOOD) 05:30 - 12:00 6.50 CASING P INTI RUN 7",26#,L-80,VTHC CASING T/3,314'MD -FILL AND CIRCULATE EVERY 10TH JOINT 12:00 - 13:00 1.00 CASING P INTI RUN 7",26#,L-80,VTHC CASING F/3,314'MD T/3,558'MD RECALIBRATE HOOKLOAD BEFORE ENTERING OH -STAGE PUMP UP TO 7 BPM,660 PSI -CIRCULATE 2X BU -P/U WT=142K, S/O WT=118K 13:00 - 15:30 2.50 CASING P INTI RIH W/ 7",26#,L-80,VTHC CASING F/3,558' MD T/4,968'MD 15:30 1600 0.50 CASING P INTI CBU RECIPROCATING PIPE F/4,968'MDT/ 4,944'MD -5 BPM,500 PSI -P/U WT=142K,S/O Wr=118K 16:00 - 00:00 8.00 CASING P INTI RIH W/ 7",26#,L-80,VTHC CASING F/4,968' ✓ MD T MD T/8,658'MD -CONT TO FILL EVERY 10TH JOINT _ 3/11/2013 00:00 - 02:30 2.50 CASING P INTI RIH WITH 7",26#,L-80,VTHC CASING F/8,658' MD TO 9,858'MD. 02:30 - 03:00 0.50 CASING P INTI MU AND TAG CASING HANGER ON DEPTH. 03:00 - 05:00 2.00 CASING P INTI CONDITION 10.4 LSND MUD WHILE RECIPROCATING CASING -NO LOSSES OBSERVED WHILE 1 CIRCULATING -STAGED UP TO 7 BPM,900 PSI 05:00 - 07:00 ( 2.00 CASING N CEMT INTI WAIT ON SLB TO MIX RETARDER FOR LEAD MIX WATER. Printed 4/8/2013 11:07:06AM O • North America-ALASKA-BP Page 13 of 22 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date 1 From-To T Hrs Task Code , NPT i NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 13:30 6.50 CASING P INTI 'INTERMEDIATE CEMENT JOB AS FOLLOWS: PSI TEST CEMENT LINES TO 250/4500 FOR 5 CHARTED MINUTES-GOOD -PUMP 30 BBLS OF 11 PPG MUD PUSH @ 6 BPM,1200 PSI. -LAUNCH BOTTOM PLUG AND CHASE W/ 165.5 BBLS OF 11.5 PPG,1.76 FT3/SK, LITE CRETE+GASBLOK @ 5.5 BPM,720 PSI. - P 42 BBLS OF 15.8 PPG,1.17 FT3/$K, CLASS G+GASBLOK @ 5 BPM,600 PSI. -LAUNCH TOP PLUG. -DISPLACE WITH 374 BBLS OF 10.4 PPG LSND MUD @ 7 BPM,400 PSI. -DID NOT BUMP PLUG ON STROKES. -PUMPED ADDITIONAL 1.65 BBLS(HALF SHOE TRACK VOLUME). -SHUT DOWN PUMPS. -FLOATS-HOLDING-CIP @ 13:00 HRS. -CMT WILL ACHIEVE 500 PSI COMPRESSIVE I STRENGTH @ 23:38 HRS. I I LOST 8 BBLS OVER ENTIRE CEMENT JOB. 13:30 - 15:30 2.00 CASING P I INTI R/D CEMENTING EQUIPMENT. i -B/D CEMENTING LINES. -B/D SLB CEMENTING LINES. I -R/D CEMENTING LINES. -UD VOLANT CRT. I-UD LANDING JOINT. -CLEAN CEMENT MANIFOLD VALVES. 15:30 - 16:00 0.50 CASING P I INTI CLEAN AND CLEAR RIG FLOOR. 16:00 - 17:30 1.50 CASING P I INTI INSTALL PACKOFF AND TEST. 250 LOW/5000 HIGH FOR 15/30 CHARTED 'MINUTES EACH(PASS) -UPLOAD CHART TO OPENWELLS 17:30 - 19:00 1.50 BOPSUR P INTI C/O UPPER RAMS T/2-7/8"X 5-1/2"VBR'S 1-TEST FOLLOWING: -4"TEST JOINT: -3-1/2"IF DART VALVE -3-1/2"IF FOSV -2-7/8"X 5-1/2"VBR'S I '"TEST ALL TO 250 PSI LOW/3500 PSI HIGH FOR 5/5 CHARTED MIN EACH(PASS) 19:00 - 21:00 2.00 BOPSUR P INTI R/U INJECTION LINES FROM MANIFOLD TO CELLAR FOR FREEZE PROTECTING OA ' -PT LINES TO 250 PSI LOW/3500 PSI HIGH FOR 5/5 CHARTED MIN(GOOD) I INJECT DOWN THE OA: -1 BPM WITH BREAK OVER AT 1145 PSI,FCP =1280 PSI. -PUMPED TOTAL OF 67 BBLS. 21:00 - 00:00 3.00 CASING P INTI MU BHA#5 PER SLB DD: -6-1/8"INSERT BIT. -1.5"-BEND MOTOR. -D&I/GR/ADN/RES/NEU/DEN. -INSTALL SOURCE PER SLB MWD. -5"HWDP AS NECESSARY. I Printed 4/8/2013 11:07:06AM • Page 14 of 22�I North America-ALASKA-BP Operation Summary Report ' Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011 MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/12/2013 00:00 - 03:00 3.00 CEMT P INTI M/U&RIH WITH PRODUCTION 6-1/8" DRILLING BHA#5 PER SLB DD TO 327' I-6-1/8"HC VM-R18DVHX INSERT BIT,1.50° MOTOR, -IMPULSE -ADN475 -C/O PS-21 SLIP INSERTS TO 4" 03:00 - 03:30 0.50 CEMT P INTI RIH WITH BHA#5 ON 4"DP DOUBLES FROM THE PIPE SHED F/327'MD TO 1,625'MD -MONITOR DISLACEMENT FROM PITS 2-3 03:30 - 04:00 0.50 CEMT P INTI PERFORM MWD SHALLOW HOLE TEST (GOOD) -240 GPM,1410 PSI -BLOW DOWN THE TOP DRIVE 04:00 - 06:00 2.00 CEMT P INTI CONT RIH WITH BHA#5'ON 4"DP DOUBLES FROM THE PIPE SHED F/1625'MD TO 4,412' 06:00 - 08:00 2.00 CEMT P INTI TIH WITH BHA ON 4"DP STANDS FROM THE DERRICK -TIH F/4,412'MD TO 7,933'MD,FILLING PIPE -MONITOR DISLACEMENT FROM PITS 2-3 -FILLING PIPE EVERY 20 STANDS 08:00 - 12:30 4.50 CEMT P INTI RU AND TEST VT HC 7"CSG TO 250PSI LOW FOR 5 CHARTED MINUTES AND 3500 PSI HIGH FOR 30 CHARTED MINUTES-TEST DID NOT MEET STABILIZATION CRITERIA FROM AK DWOP 10-45 SEC 5C -RETEST CASING TO SAME PRESSURES AND SEND PRESSURE TEST RESULTS TO TOWN SECOND TEST-GOOD 12:30 - 14:30 2.00 CEMT P INTI PJSM FOR SLIP AND CUT DRILL LINE -SLIP AND CUT 141'OF DRILL LINE 14:30 - 16:30 2.00 CEMT • P INTI TIH WITH BHA ON 4"DP STANDS FROM THE DERRICK -TIH FROM 7,933'MD TO TO 9,637'MD -PUW-255K,SOW-107K -WASH DOWN F/9,637'MD TO 9,770'MD -105 GPM,1200 PSI,30 RPM,14K TQ, -TAG TOP CMT PLUG AT 9,770' 16:30 - 17:30 1.00 DRILL P INTI DRILL OUT SHOE TRACK F/9,770'MD T,O 9,848'MD(10'FROM THE SHOE) -230 GPM,2325 PSI,40 RPM,14 K TQ, WOB-3K -PUW-255 K,SOW-119K 17:30 - 19:00 1.50 DRILL P INTI DISPLACE WELL TO 8.8 PPG POWER-PRO -230 GPM,1793 PSI -60 RPM, ROTATE AND RECIPROCATE F/9,827'TO 9,848' SPR'S:9,846'MD(8583'TVD)-TIME=19:00, MW=8.8 PPG #1 MP-20/30 SPM=400/540 PSI _ #2 MP-20/30 SPM=440/560 19:00 20:00 1.00 DRILL P INTI DRILL SHOE TRACKAND 20'OF NEW FORMATION TO 9,883'MD -230 GPM,1330 PSI -40 RPM,51(TQ -3KWOB P/U 189K,S/O 158K Printed 4/8/2013 11:07:06AM • North America-ALASKA-BP Page 15 of 22 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: i X3-011 MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) -- t) 0:00 - 21:00 1.00 DRILL P INTI CIRCULATE BOTTOMS UP -250 GPM,1382 PSI -60 RPM,6K TQ MONITOR WELL FOR 10 MIN—STATIC 21:00 - 23:00 2.00 DRILL P INTI PULL BACK INTO SHOE&PERFORM FIT TO. 412.5 PPG EMW SURFACE PRESSURE TO 1660 PSI WITH !SHOE TVD @ 8,594' MW8.81N/8.8OUT 12.0 BBLS PUMPED,1.5 BBLS RETURNED -12.5 PPG FIT GIVES US AN INFINITE KICK }TOLERANCE SENT RESUrtS TO TOWN ODE AND FOR ,APPROVAL, 1-AUTHORIZATION TO PROCEED RECEIVED i 1 FROM ODE WITH GREATER THAN 50 BBL KICK TOLERANCE -CLEAN OUT SHAKER BELLY'S WHILE WAITING FOR APPROVAL FROM ODE / 23:00 - 00:00 1.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 9,883' MD TO 9,903"MD(8,636'TVD) 242 GPM,1,650 PSI ON/1,380 PSI OFF i WOB=18-22K I-mw=8.8 PPG IN/8.8 PPG OUT -P/U=190K,S/O=160K,ROT= AST=1.22 HRS,ART=0.00 HRS,ADT=1.22 HRS TOTAL BIT HRS=1.22,TOTAL JAR HRS=1.22 TOTAL LOSSES FOR LAST 24 HRS=0 BBLS 3/13/2013 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE SECTION .� FROM 9,903"MD TO 10,146'MD 8,822'TVD -251 GPM,1,706 PSI ON/1,520 PSI OFF WOB=15-25K,40 RPM,7K TQ -MW=8.8PPG IN/8.BPPG OUT ;-P/U=193K,S/O=163K,ROT=165K AST=5.88 HRS,ART=0.92 HRS,ADT=6.8 HRS TOTAL BIT HRS=8.02,TOTAL JAR HRS=8.02 SPR'S:10,139'MD(8,822'TVD)-TIME=11:50, MW=8.8 PPG #1 MP-20/30 SPM=520/640 PSI #2 MP-20/30 SPM=460/560 Printed 4/8/2013 11:07:06AM North America-ALASKA-BP Page 16 of 22 Operation Summary Report Common Well Name.Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011 MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 ; Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual(g)96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE SECTION FROM 10,146'MD TO 10,552'MD,8,956'TVD -251 GPM,1,806 PSI ON/1,528 PSI OFF WOB=15-25K,40 RPM,7K TQ -MW=8.8PPGIN/8.8PPGOUT -P/U=193K,S/O=155K,ROT=165K AST=2.23 HRS,ART=4.79 HRS,ADT=7.02 HRS TOTAL BIT HRS=15,TOTAL JAR HRS=15 !TOTAL LOSSES FOR LAST 24 HRS=0 SPR'S:10,485'MD(8,944'TVD)-TIME=22:30, MW=8.8 PPG #1 MP-20/30 SPM=480/620 PSI #2 MP-20/30 SPM=440/560 3/14/2013 00:00 - 11:30 11.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE SECTION FROM 10,552'MD,TO 10,867'MD,8,931'TVD -251 GPM,1,770 PSI ON/1,600 PSI OFF -WOB=15-25K,40 RPM,8-9 K TO MW=8.8PPG IN/8.8PPG OUT -P/U=195K,5/0=155K,ROT=165K AST=4.34 HRS,ART=1.22 HRS,ADT=5.56 HRS TOTAL BIT HRS=20.56,TOTAL JAR HRS= 20.6 � I SPR'S:10,855'MD(8,931'TVD)-TIME=11:45, MW=8.8PPG IC MP-20/30 SPM=460/580 PSI #2 MP-20/30 SPM=440/600 11:30 - 12:30 1.00 DRILL P i PROD1 CIRCULATE BOTTOMS UP,ROT AND RECIPROCATE F/10,867'TO 10,772' -250 GPM,1570 PSI,40 RPM 12:30 - 20:30 8.00 DRILL P PROD1 MONITOR WELL FOR 10 MIN-WELL STATIC -BLOW DOWN TOP DRIVE I-POOH ON ELEVATORS F/10,867'MD TO 422' -MONITORING WELL VIA THE TRIP TANK, MAINTAIN ACCURATE TRIP SHEET -PUW-195K,SOW-155K,ROT 165K 20:30 - 21:30 1.00 DRILL P PROD1 MONITOR WELL PRIOR TO PULLING BHA THROUGH THE STACK -WELL STATIC. -POOH F/422'TO 202' -C/O PS21 SLIP INSERTS,LD BHA#5 PER SLB(DD)REP 21:30 - 22:00 0.50 DRILL P PROD1 PJSM FOR PULLING THE RADIOACTIVE SOURCE FROM THE BHA -PULL- SOURCE PER SLB PROCEDURE. --_---SSSS-- 22:00 - 23:30 1.50 DRILL P PROD1 FINISH LAYING DOWN 6-1/8"PRODUCTION BHA#5 - F/94 TO SURFACE - BIT GRADE:2-8-LT-G-E-6-RG-PR 23:30 - 00:00 0.50 DRILL P PROD1 CLEAN&CLEAR RIG FLOOR !-RIG UP FOR BOPE TESTING Printed 4/8/2013 11:07:06AM North America-ALASKA-BP Page 17 of 22 4,0+r, e Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/15/2013 00:00 - 06:00 6.00 BOPSUR P PROD1 TEST BOPE PER BP/AOGCC/DDI 1 REQUIREMENTS TO 250-PSI LOW/3500-PSI HI. �U� TESTED 2-7/8"X 5-1/2"UPPER VBR'S,2-7/8"X 5-1/2"LOWER VBR'S WITH 4" TEST JT. TESTED BLIND SHEAR RAMS 250-PSI LOW/ 3500-PSI HI,2 EA.OF 4-1/2"IF FOSVS, 1 EA. OF 4"DART VALVE&FOSV.TESTED CHOKE MANIFOLD VALVES 1-15,CHOKE AND KILL MANUAL&HCR VALVES,4"KILL LINE VALVE& UPPER AND LOWER TOP DRIVE IBOP'S. TESTED MANUAL AND SUPER CHOKES TO 250-PSI LOW/3500-PSI FOR 5 CHARTED MINUTES EACH TEST. TESTED ANNULAR PREVENTER WITH 4" TEST JT.250-PSI LOW/ 3500-PSI HI. CHARTED ALL HI AND LO TESTS FOR 5-MINUTES EACH.. **UPPER IBOP (FAILED),C/0&RE TEST '(PASS) CLOSING TIMES: 'BLIND/SHEARS=18 SEC UPPER VBR'S=18 SEC !LOWER VBR'S=16 SEC ANNULAR=22 SEC HCR KILL=3 SEC HCR CHOKE=3 SEC PERFORMED ACCUMULATOR DRAW DOWN TEST: -ACCUMULATOR PSI=3000,MANIFOLD PSI= 1500 -ACCUMULATOR PSI AFTER FUNCTIONING BOPE=1600-PSI -RECOVERY TO FULL SYSTEM PRESSURE= 2-MINUTES 18-SECONDS. -6 NITROGEN BOTTLES AVERAGE PRESSURE=2000-PSI REFERENCED DDI BOP TESTING SOP FOR ALL TESTING. BOPE TEST WITNESSED BY i AOGCC-DOYON TOUR PUSHER-ROY FRITZ, AND BP WSL-ANTHONY KNOWLES JEFF JONES W/AOGCC WAIVED WITNESS. 06:00 - 07:30 1.50 BOPSUR P PROD1 RIG DOWN TEST EQPT,BLOW DOWN LINES& CHOKE MANIFOLD -PULL TEST PLUG&SET WEAR BUSHING _------------------- 07:30 - 08:00 0.50 BOPSUR P PROD1 PJSM FOR TOP DRIVE SERVICE LOCK OUT AND TAG OUT&SERVICE TOP DRIVE 08:00 - 12:30 4.50 BOPSUR N PROD1 PJSM FOR CHANGING OUT UPPER IBOP ON TOP DRIVE -CHANGE OUT UPPER IBOP -RE-TEST NEW IBOP-250 PSI LOW,3500 PSI LHIGH FOR 5 CHARTED MIN-(PASSED) Printed 4/8/2013 11:07:06AM "" North America-ALAKA-BP Page 18 of 22 Operation Summary Report Common Well Name.Z-66 AFE No Event Type:DRL-ONSHORE(DON) I Start Date:2/20/2013 I End Date: IX3-011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay I Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 16:00 3.50 DRILL P PROD1 PJSM FOR PICKING UP BHA#6 PU/MU&RIH WITH 6-1/8"PRODUCTION BHA #6-PER SLB DD REBUILT 6-1/8"HYCALOG PDC BIT, 4.75" I MOTOR W/1.5 DEG BEND, IMPULSE AND ADN 475-RIH TO 95' PJSM WITH SLB AND RIG CREW FOR LOADING THE SOURCE -LOAD SOURCE PER SLB PROCEDURE i-CONTINUE RIH F/95'TO 1,700'FOR SHALLOW HOLE TEST FOR MWD TOOLS- GOOD TEST -249.5 GPM,1100 PSI 16:00 - 22:00 6.00 DRILL P PROD1 TIH WITH 6-1/8"PRODUCTION BHA#6 F/1700' TO 10,775'MD TIH ON 4"DP FROM THE DERRICK. WASH AND REAM LAST STAND TO BOTTOM. -250 GPM,40 RPM,1570 PSI 22:00 - 00:00 2.00 DRILL P PROD1 IDRILL 6-1/8"PRODUCTION HOLE F/10,867' V' MD,8,931'TVD TO 10,939'MD 8,930'TVD -251 GPM,1,705 PSI ON/1,560 PSI OFF -WOB=15K,40 RPM,8 K TQ ON/7 K TQ OFF -MW=8.8 PPG IN/8.8 PPG OUT P/U=199K,S/O=149K,ROT=175K AST=.68 HRS,ART=.34 HRS,ADT=1.02 HRS TOTAL BIT HRS=1.02,TOTAL JAR HRS=1.02 SPR'S:10,871'MD(8,931'TVD)-TIME=22:30, MW=8.8 PPG #1 MP-20/30 SPM=420/540 PSI #2 MP-20/30 SPM=380/520 3/16/2013 00:00 - 12:00 12.00 DRILL PROD1 DRILL 6-1/8"PRODUCTION HOLE F/10,939'MD V , 8,930'TVD TO 11,537'MD,8,939'TVD 251 GPM,1,750 PSI ON/1,350 PSI OFF -WOB=3-15K,60-80 RPM,9 K TQ ON/8 K TQ OFF MW=8.8 PPG IN/8.8 PPG OUT -P/U=197K,S/O=153K,ROT=177K AST=1.48 HRS,ART=3.42 HRS,ADT=4.90 HRS TOTAL BIT HRS=5.92,TOTAL JAR HRS=26.5 SPR'S:11,347'MD(8,931'TVD)-TIME=08:00, MW=8.8PPG #1 MP-20/30 SPM=440/580 PSI #2 MP-20/30 SPM=420/560 Printed 4/8/2013 11:07:06AM • North America-ALASKA-BP ' " Page 19 of 22 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011 MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay 1 Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) — (usft) 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE F/ 11,537'MD ✓' ,8,939'TVD TO 11,912'MD,8,939 TVD 251 GPM,1,750 PSI ON/1,350 PSI OFF -WOB=3-15K,60-80 RPM,9 K TO ON/8 K TQ OFF -MW=8.8 PPG IN/8.8 PPG OUT -P/U=201K,S/O=146K,ROT=174K AST=4.50 HRS,ART=1.61 HRS,ADT=11.01 HRS I TOTAL BIT HRS=12.03,TOTAL JAR HRS= 32.6 SPR'S:11,726'MD(8,945'TVD)-TIME=18:00, MW=8.8PPG #1 MP-20/30 SPM=460/620 PSI #2 MP-20/30 SPM=400/600 3/17/2013 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE F/11,912'MD 8,930'TVD TO 12,245'MD 8,937'TVD -251 GPM,1,950 PSI ON/1,800 PSI OFF -WOB=15-30K,60-80 RPM,10 K TQ ON/9 K TQ OFF -MW=8.8 PPG IN/8.8 PPG OUT AST=2.53 HRS,ART=2.36 HRS,ADT=4.89 IHRS TOTAL BIT HRS=17.0,TOTAL JAR HRS=37.6 I I i SPR'S:12,201'MD(8,933'TVD)-TIME=10:50, MW=8.8PPG #1 MP-20/30 SPM=520/640 PSI #2 MP-20/30 SPM=480/660 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE F/12245'MD 8,937'TVD TO 12,996'MD,8,942'TVD 251 GPM,1,985 PSI ON/1,792 PSI OFF V WOB=15-30K,60-80 RPM,10 K TQ ON/9 K TQ OFF -MW=8.8 PPG IN/8.8 PPG OUT I i AST=1.02 HRS,ART=5.22 HRS,ADT=6.26 HRS TOTAL BIT HRS=23.26,TOTAL JAR HRS= 43.4 SPR'S:12,676'MD(8,929'TVD)-TIME=19:00, MW=8.8 PPG #1 MP-20/30 SPM=500/680 PSI #2 MP-20/30 SPM=520/670 Printed 4/8/2013 11:07:06AM e North America-ALASKA-BP Page 20 of 22 Operation Summary Report Common Wet Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) 1 Start Date:2/20/2013 I End Date: !X3-011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM I Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. j UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date I From-To ' Hrs Task Code ' NPT NPT Depth Phase Description of Operations (hr) (usft) _ 3/18/2013 00:00 - 08:00 8.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE F/12,996' MD,8,942'TVD � TD WELL @ 7:50 AM,13,386'MD,8,988 TVD 1-251 GPM,1,985 PSI ON/1,792 PSI OFF -WOB=15-30K,60-80 RPM,10 K TQ ON/9 K TQ OFF -MW=8.8 PPG IN/8.8 PPG OUT AST=0.49 HRS,ART=3.10 HRS,ADT=3.49 IFIRS TOTAL BIT HRS=26.58,TOTAL JAR HRS= 47.5 SPR'S:13,152'MD(8,958'TVD)-TIME=03:15, MW=8.8 PPG #1 MP-20/30 SPM=600/780 PSI #2 MP-20/30 SPM=640/780 PSI 08:00 - 11:00 3.00 DRILL P PROD1 1-CIRC 30 BBL HIGH VIS SWEEP T/SURFACE WHILE ROT&RECIP F/13,385'MD T/13,335' I MD @ 250 GPM,1630 PSI,21%F/O,80 RPM, 8-9K TQ. -OBTAIN SPR'S 13,386'MD(8,988'TVD)-TIME -=09:45,MW=8.8 PPG #1 MP-20/30 SPM=450/610 PSI #2 MP-20/30 SPM=470/610 PSI -CIRC ADDITIONAL 1.5 B/U WHILE ROT& RECIP F/13,342'MDT/13.40 MD @ 120 RPM, 9-10K TQ.,ALL OTHER PARAMETERS SAME - 00:00 13.00 EVAL P PROD1 (SLIGHT DROP 11:00 ,-MONITOR WELL FOR 10 MIN I IN LEVEL) -BROOH F/13,240'MD T/12,332'MD @ 60 RPM,250 GPM,1510 PSI,21%F/O,6-8K TQ, UP WT=202K,DOWN WT=147K -MAD PASS F/12,232'MD T/11,654'MD @ 250 GPM,1500 PSI,21%F/O,60 RPM,8K TQ -BROOH F/11,654'MD T/10,933'MD @ 60 RPM,250 GPM,1450 PSI,21%F/O,8K TQ -MAD PASS Ff 10,933'MD T/9,904'MD @ 250 !GPM,1500 PSI,21%F/O,60 RPM,8K TQ- 3/19/2013 00:00 - 01:00 1.00 DRILL P PROD1 -COMPLETE MAD PASS OPERATIONS -CIRCULATE BOTTOMS UP INSIDE THE SHOE -250 GPM,1440 PSI,40 RPM 01:00 - 01:30 0.50 DRILL P PROD1 RIG SERVICE -GREASE TOP DRIVE 01:30 - 05:00 3.50 DRILL P PROD1 TIH ON ELEVATORS FROM 7"SHOE TO(TD) ,AT 13,345'MD -MONITOR TRIP VIA THE TRIP TANK 1-TIGHT @ 11,995'MD Printed 4/8/2013 11:07:06AM • North America-ALASKA-BP : z 'k r Page 21 of 2'2 Operation Summary Report - . .. Commcn Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date X3-011 MR-C.DRILL(9,245,086.00) Project Prudhoe Bay I Site.PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8.00:00AM Rig Release:3/25/2013 Rig Contractor.DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 08:30 3.50 DRILL P PROD1 WASH F/13,345'MD TO 13,386 MD(8988'TVD) -ROTATE AND RECIPROCATE -CBU 1.5X j- 250 GPM,1530 PSI, -60 RPM,7-9 TQ RACK BACK STD#138 AND CONTINUE TO ROTATE AND RECIPROCATE 13,345'MD TO 13,250'MD WITH SAME PARAMETERS. -CBU 3X -OBTAIN SCR @ 13,247'MD,8971'ND -MP#1 20/30 SPM 420/580 PSI -MP#2 20/30 SPM 420/560 PSI _ -MONTIOR WELL,STATIC. 08:30 - 12:00 3.50 DRILL P PROD1 POOH ON ELEVATORS F/13,345'MD TO 9832' MD -MONITOR HOLE FILL VIA TRIP TANK -TIGHT SPOT F/11,810'MD TO 11,790'MD, PULL 25K OVER, WIPED 4X 12:00 - 14:00 2.00 DRILL P PROD1 DROP 1.76"OD BALL TO OPEN"WELL COMMANDER"CIRC SUB -OPEN WITH 2700 PSI -CBU 1.5X W/400 GPM,1050 PSI -RECIPROCATE PIPE F/9832'MD TO 9730'MD -PU WT 186K,SO WT 161 K -TOTAL STKS PUMPED 2920 -DROP 1.76"OD BALL AND CLOSE CIRC SUB W/3339 PSI 14:00 - 16:00 2.00 DRILL P PROD1 RIH F/9832'MD TO 12,110'MD -TAKING WT @ 11,675'MD 30K,@ 11,790'MD 15K,@11,856'MD25K,@11,875'MD30K 16:00 - 18:30 2.50 DRILL P PROD1 BACK REAM F/12,015'MD TO 11,630'MD -250 GPM, 1550 PSI -40/80 RPM,6-7 TO -PU WT 200K,SO-150K,ROT-167K 18:30 - 21:30 3.00 DRILL P PROD1 RIH ON ELEVATORS F/11,630'MD TO 11,945' MD !- TAKING WEIGHT @ 11,655'MD 30K,a '11,790'MD35K,@11,813'MD35K,@11,856'- -MD 20K,@ 11,945'MD 35K. -ATTEMPT TO WORK THROUGH 11,945'MD W/125/150 GPM,600/760 PSI,NO GO. 21:30 - 22:30 1.00 DRILL P PROD1 INCREASE TO 250 GPM,1500 PSI,ROTATE AND RECIPROCATE SUCCESSFULLY THROUGH OBSTRUCTION F/11,938'MD TO 11,980', -40 RPM -il -PU-200K,SO-150K,ROT-170K 22:30 - 23:30 1.00 DRILL P PROD1 RIH F/11,917'MD TO 13,345'MD 23:30 - 00:00 0.50 DRILL P PROD1 MU TDS AND WASH F/13,345'MD TO 13,386' MD -250 GPM,1575 PSI -40/100 RPM -7-8K TQ 3/20/2013 00:00 - 02:30 I 2.50 DRILL P PROD1 ROTATE AND RECIPROCATE F/13,386'MD TO 13,340'MD WHILE CBU -MONTIOR WELL,STATIC 02:30 - 06:30 4.00 DRILL P PROD1 POOH TO PU/RUN 4.5 PRODUCTION LINER F/ 13,340'MD TO 9832'MD -PULLED 20K OVER @ 11,950', DRY WIPED 3X,OK. Printed 4/8/2013 11:07:06AM sl4orth America-ALASKA BP, r r Page 22 of 22 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/20/2013 End Date: X3-011MR-C:DRILL(9,245,086.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI. Active datum:Z-66 actual©96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 06:30 - 08:30 1 2.00 DRILL P PROD1 DROP 1.76"OD BALL AND OPEN WELL COMMANDER CIRC SUB,SHIFT OPEN W/ 2500 PSI -ROT/RECIP 9832'MD TO 9737'MD WHILE CBU 2X DROP BALL AND CLOSE W/3000 PSI MONTIOR WELL 10 MIN,STATIC -PUMP DRY JOB 08:30 - 14:30 6.00 DRILL P PROD1 POOH F/9832'MD TO 427'MD 14:30 - 18:00 3.50 DRILL P PROD1 C/O SLIPS -LD BHA EQUIPT -PJSM ON NUCLEAR SOURCE HANDLING, SLB MWD REMOVE SAME. -CONT LD BHA#6 -BIT GRADE 8-8-RO-A-X-1/8-TD Printed 4/8/2013 11:07:06AM North America-ALASKA-BP Page 1 of 4 Operation Summary Report Common Well Name:Z-66 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/20/2013 End Date:3/25/2013 X3-011 MR-C:DRILL(3,384,760.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8 00 00A Rig Release:3/25/2013 Rig Contractor.DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations 11 (hr) (usft) 3/20/2013 18:00 - 21:00 3.00 CASING P RUNPRD CLEAN/CLEAR RIG FLOOR RU TO RUN 4.5"12.6#13 CR-85 HYDRIL 521 LINER AND ASSOCIATED PRODUCTION _ EQUIPMENT 21:00 - 00:00 3.00 CASING P RUNPRD PJSM, PU SHOE TRACK,FILL AND CHECK FLOAT EQUIPMENT,OK RIH W/4.5"12.6#13 CR-85 HYDRIL 521 LINER,PU PUPS AND SWELL PACKERS F/0' TO 667'(11 OF 73JTS,) 3/21/2013 00:00 - 06:00 6.00 CASING P RUNPRD RIH W/4.5" 12.6#13 CR-85 HYDRIL 521 LINER 'AND PRODUCTION EQUIPMENTS F/667'MD I TO 366V MD 06:00 - 07:30 1.50 CASING P RUNPRD I C/O ELEVATORS,PU/MU BAKER FLEX LOCK III ZXP LINER HANGER -DRAIN STACK AND FILL PBR WITH PALL MIX -CIRC 2X LINER VOLUMES 07:30 - 12:30 5.00 CASING P RUNPRD PU 12 JTS OF 4"HWDP FROM SHED TO 4081' MD -RIH W/1 STD 4"HWDP AND 4"DP TO 9790' MD,FILL EVERY 1000' -MONITOR FLUID VIA PIT 2 12:30 - 13:30 1.00 CASING P RUNPRDCIRC LINER AT 9790', �-STAGE UP PUMPS TO 3.8 BPM,FCP 580 PSI, 1N0 LOSSES I I-PU WT 165,SO 146 K 13:30 - 16:30 3.00 CASING P RUNPRD CONT RIH W/4.5"LINER ON 4"DP F/9790'MD TO 13,384'MD -PU WT 210K,SO 146K 16:30 - 20:00 3.50 CASING P RUNPRD CIRC 4.5"LINER ON BOTTOM, -STAGE PUMPS UP TO 3.7 BPM, REDUCE RATE TO 2.5 BPM LOSSES DURING RIH AND CIRC 7 BBLS 1120:00 - 23:30 3.50 CASING P RUNPRD PJSM FOR PUMPING SPACERS PER MI PUMPING SCHEDULE. -DISCUSSED MI PROCEDURE AND ROLES AND RESPONSIBILITIES FOR THIRD PARTIES AND DDI PUMPED OBM SPACER PER MI SCHEDULE PUMP 150 BBLS OF 8.6 PPG NACL W/2%KCL, AT 2.5 BPM, ICP 660 PSI -25 BBLS OF LVT BASE OIL -50 BBLS OF 9.6 PPG RHELIANT -127 BBLS OF 8.8 PPG RHELIANT OBM -25 BBL HIGH VIS RHELIANT I i I -BREAK PIPE AND DROP 1.75"NEUTRAL WEIGHT BALL AND PUMP REMAINDER OF HIGH VIS RHELIANT OPM,10 BBLS CHASE WITH 8.8 PPG MOBM TO SEAT BALL IN WELLBORE ISOLATION VALVE -2 BPM,990 PSI.BALLON SEAT WITH 143 BBLS PUMPED. 4 BBL EARLY. TOATL FLUID LOSS DURING OBM CIRCULATION-2 BBLS Printed 4/8/2013 11.07.52AM NorthP.tnenca-ALASKA BP _ P,age2 of4 .-yxa .0 f s". '" ''' w it . v� .;P'`fL 'rt''fin fl i �y4.;k ,.z�, �' efamon uintnate �# w y � h _.. ._ .. ,..r. �. -,,,-,',;-- Common ,i .� m -� __� _._- e�� _ tx�'�c, .. Vis, . . .,, - - Common Well Name:Z-66 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/20/2013 End Date:3/25/2013 X3-011MR-C:DRILL(3,384,760.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs • Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 CASING P 1 ' RUNPRDSET LINER TOP HANGER AND PACKER -PRESSURE UP TO 3000 PSI TO SET HANGER SLIPS I-BLEED PSI,SLACK OFF TO 60 K TO VERIFY HANGER SET -PRESSURE UP TO 3800 PSI TO TO RELEASE HRD RUNNING TO PU TO 220 K I-- HRD-E TOOL DID NOT RELEASE PRESSURE BACK UP TO 4200 PSI TO RELEASE HRD SETTING TOOL 1-PU TO 198K,CONFIRM RELEASE FROM HANGER -PU 5'1 OFFTO 60KRELEASE,LINERDOG TOP PACKERON SET AT 25K.GOOD SURFACE INDICATION WT INDICATOR -P UAND THEN SLACK OFF 60K ROTATING 20 RPM ON PACKER TO CONFIRM SET 3/22/2013 00:00 - 02:30 2.50 CASING ' P RUNPRD j RU TO TEST 4 1/2"TBG BY 7"CASING LIFER TOP PACKER -250 PSI LOW FOR 5 CHARTED MIN -3500 PSI HIGH FOR 30 CHARTED MIN. -PRESSURE BLED DOWN 87 PSI IN THE FIRST 15 MIN,62 PSI IN THE SECOND 15, -FAILED TEST REPORT TO ODE -PUMP PRESSURBACK 00 RE - E BLEDUPTO DOWN3550FOR PSI INTEST THE FIRST 15 MIN,37 PSI IN THE SECOND 15 -FAILED RETEST 02:30 - 03:30 1.00 CASING P RUNPRD ROTATE AT 20 RPM'S,5 TQ,&SET 60 K ON PACKER TO CONFIRM SET OF LINER TOP PACKER 03:30 - 04:30 1.00 CASING P ' RUNPRD PU TO HAVE RUNNING TOOL ABOVE RS BUSHING AND LINER TOP RU AND TEST 4-1/2"TBG BY 7"CASING LINER TOP PACKER -250 PSI LOW FOR 5 CHARTED MIN 3500 PSI HIGH FOR 30 CHARTED MIN. PRESSURE BLED DOWN 56 PSI IN THE FIRST 15 MIN,12 PSI IN THE SECOND 15, -SUCCESSFUL TEST -hD TEST EQUIPMENT 04:30 - 06:30 2.00 CASING P RUNPRD DISP WELL TO 8.8 BRINE PUMP 50 BBL VISCOSIFIED 8.8 BRINE( 2.5#/BBL FLOZAN,5%DEEP CLEAN)&50 BBLS OF 8.8 BRINE(10%DEEP CLEAN) -380 GPM,1400 PSI i-PU-191 K,SO-158K, -CLEAN OUT UNDER SHAKERS -PUMP 355 BBLS 8.8 BRINE @ 9 BPM,1800 PSI ICP/1390 PSI FCP MONITOR WELL F/10 MIN(STATIC) 06:30 - 09:00 2.50 CASING P RUNPRD SLIP&CUT EDRILL LINE(12 WRAPS-94') 09:00 - 13:30 4.50 CASING P RUNPRD POOH UD DOUBLES F/9,866'T/3,180'MD 13:30 - 15:30 2.00 CASING P RUNPRD RIH W/STD'S 4"DP F/DERRICK F/3,180'T/ 7,400'MD 15:30 - 23:00 7.50 CASING P RUNPRD POOH UD SINGLES F/7,400'MD T/SURFACE Printed 4/8/2013 11:07:52AM Common Well Name:Z-66 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/20/2013 End Date:3/25/2013 1X3-011 MR-C:DRILL(3,384,760.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time:2/26/2013 8:00:00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual @96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 23:30 0.50 CASING P RUNPRD UD PACKER RUNNING TOOL T/PIPE SHED INSPECTED BY WSLAND BAKER REP ON SURFACE TO CONFIRM DOG SET SHEARED 23:30 - 00:00 0.50 RUNCOM P RUNCMP C/O SLIP INSERTS T/4-1/2",MOBILIZE CSG RUNNING EQUIP.T/RIG FLOOR,DRAIN STACK 3/23/2013 00:00 - 01:30 1.50 RUNCOM P RUNCMP CO ELEVATORS PULL SLIP INSERTS,PULL WEAR BUSHING,AND LD SAME 01:30 - 02:30 1.00 RUNCOM P RUNCMP C/O ELEVATORS,MAKE DUMMY RUN WITH TBG HANGER AND MARK, LD SAME. 02:30 - 03:00 0.50 RUNCOM P RUNCMP PJSM W/HALLIBURTON,SLB,DDI ON RUNNING COMPLETION 03:00 - 03:30 0.50 RUNCOM P j RUNCMP PU SLB I-WIRE SPOOLER,TOOLS,CLAMPS TO RIG FLOOR 03:30 - 23:00 19.50 RUNCOM P RUNCMP P _PU AND RIH W/4.5"12.6#13-CR80 VAM TO COMPLETION AS PER TALLY F/SURFACE TO 9682'MD(TAG ON DEPTH) -TEST"I-WIRE"EVERY 25 JTS -PU=151 K,SO=125K 23:00 - 00:00 1.00 RUNCOM P RUNCMP SPACE OUT W/PUP JTS,PU/MU HANGER, DRAIN STACK, 3/24/2013 00:00 - 01:00 1.00 RUNCOM P RUNCMP LAND HANGER,-RUN IN LOCK DOWN SCREWS -RU CIRC LINE AND TEST TO 4,000 PSI,OK 01:00 - 03:00 2.00 RUNCOM P RUNCMP PJSM,REVERSE CIRC 150 BBLS 80° 9.4 PPG BRINE @ 4 BPM/500 PSI FOLLOWED BY -106 BBLS 80° 9.4 PPG BRINE TREATED W/ CORROSION INHIBITOR FOLLOWED BY -76 BBLS 80°9.4 PPG BRINE -PUMP 5 BBLS DOWN TUBING TO CLEAN RHC-M PLUG PROFILE IN LOWER X NIPPLE. 03:00 - 06:00 3.00 RUNCOM P RUNCMP DROP BALL ROD TO RHC-M AND TEST TBG TO 250 PSI LOW/3500 HIGH AND CHART. —FIRST TEST FAIL CRITERIA, -PUMP BACK UP AND RETEST, FAILED CRITERIA -BLEED BACK PRESSURE TO ZERO AND RETEST 250 PSI LOW/3500 HIGH AND CHART, SUCCESSFUL TEST. 06:00 - 07:00 1.00 RUNCOM P RUNCMP TEST 4 1/2"X 7"ANNULUS AND PACKER,250 PSI LOW/3500 PSI HIGH AND CHART, SUCCESSFUL TEST 1-WO APPROVAL FROM TL. 07:00 - 07:30 0.50 RUNCOM P RUNCMP j BLEED OFF TBG PRESSURE AND SHEAR DCR VALVE. CONFIRM BBLS PUMPED TO BBLS BLED BACK,OK. -PUMP RATE DOWN TBG 3BPM @ 1150 PSI, DOWN ANNULUS 3BPM @ 1100 PSI. 07:30 - 10:00 2.50 RUNCOM , P RUNCMP PULL LANDING JT, -DRY ROD IN TWC -INSTALL LANDING JT -CHART TEST BELOW TWC 250 PSI 5 MIN LOW/30 MIN 3500 PSI HIGH,OK. -CHART TEST ABOVE TWC 250 PSI 5 MIN LOW/30 MIN 3500 PSI HIGH,OK. 10:00 - 15:00 5.00 RUNCOM P ' ' RUNCMP NIPPLE DOWN BOP -DSA,SPACER SPOOL -SKID BOP -PULL RISER. Printed 4/8/2013 11:07:52AM • forth menc2-7AU 4-1113- Pale Operation Summary Report Common Well Name:Z-66 AFE No Event Type.COM-ONSHORE(CON) Start Date 3/20/2013 End Date 3/25/2013 X3-011 MR-C:DRILL(3,384,760.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 25 Spud Date/Time-2/26/2013 8.00.00AM Rig Release:3/25/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Z-66 actual©96.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 20:30 5.50 RUNCOM P RUNCMP PU/INSTALL XMAS TREE -FMC REP TEST VOID 250 PSI LOW 5 MIN, 5000 PSI HIGH 30 MIN,OK i-INSTALL LUBRICATOR AND CHART TEST 250 PSI LOW/3500 HIGH 5 MIN -REMOVETWC 20:30 - 00:00 3.50 RUNCOM P RUNCMP RU TO FREEZE PROTECT -PJSM,CHART TEST LINES AND INNER ANNULUS VALVES 250 PSI LOW/3500 PSI HIGH -REVERSE 74 BBL 80°DIESEL,1.5 BPM/2000 PSI. -STOP PUMPING AND ALLOW TO U-TUBE 3/25/2013 00:00 - 01:00 1.00 RUNCOM P RUNCMP ALLOW DIESEL TO U-TUBE -RD TBG CIRC LINES IN SUB 01:00 - 04:30 3.50 RUNCOM P RUNCMP INSTALL BPV,TEST BPV,INNER OA VALVE ✓ _ 250 PSI LOW/3500 PSI OK 04:30 - 06:00 1.50 RIGD P RUNCMP RIG DOWN TEST LINES, RELEASE RIG 06:00 HRS Printed 4/8/2013 11:07:52AM N O i 17MN14 sagassoaa. E i-rnlm o-n.EyA !!! EAo WW, ' o�i 3gco mmm Wammm WOiSWrm 'Wmmm WON.ONEOf. . . ....W Oita... ... W ...W. .. ..... a 4:.L69-66 ^:lA.l< Wt•)O t,I tND nip ASN O.m.Vp INO.t7 BWaD'A p1'1ON ch V a a^m^ m�yypNp���Oa O [y6(+�yS O.ON f��y m}lP O.IOA A 9 r Ap np1Sp� AMA WWn •Rials aaq i)L'i ` FAA w A YAFAA p" J N ry N l�N N N ry N N N N N N N 1m.1 N N N N N N N N N N N N N ri N No N N N N G O O AO r C O R R R n^0 0^ O O R R R O O O C A A o 0 0 0 AO A OA A A 0 N .pp pp yy pp mmt7 pp� CEA aoRI r NmSS S NRR yMw O NtON V2a ;R W A 0 nnm�ap; t;7t,pt;7,-4".=4R L`¢'OS mmm8 N aaNN W C�iaA A REEK r ra n1701WOt�1 p1 �I& l RNNR .RNgI IRR�g �8R8e EtIE EIEAA pq�. .. ... mh p .{� OO �l.p.. . .... .....rypp N C=�.~.00S N W mSR WSS17h 1pMS^IOON Od8e0 NmOIENOSt•f INN 0 ESSoo IMI ottV7 pN ro^N Qi i0 aDN Mil Tafl'NO O.O.vWf.��YYff O.YOY1.1�OONI ECM.00.0O1 W Iy�N mEWO Ifmibl�Oi�O S TW�OO.m.00l m W�OWODm EWOD ll W W EWE O OO EC W W E.W WEE EE.EE E EEEE. hEEEE hiOmN N Hh tOE mNM NN .ON N N 2i48ryo� wgErr..i' ee omm $6EE$ !,MIF, E�vt :ilt" O COON 017 a-OC OtV Nt7N h�O m A !,MIF.- ��N C ,1!”! 02 Wx88312N pC o1.1p A N7pp mmr ae pVp RqR NWNfpmW mmm Ma,Y1 N:=O NF. OCGQoOry" D Nt4 ; NryN OI2OS ;Vagg . ‘ 'S".." n OD JCER mz.,p 8p 8V ANNffi� gasmh $$h$< O$:.m R;;VPpp p IE'p O W � ''.'="0- V-va qAmn NOO1 W7OA2 ArrNm 03d !� m f0 C2 -2r mm y.O .00 1y� m tpp y 0 0 C Y O R ;CBSg V f mR.WON A Nt72V6 W h V l7 m V G2V°2 Yf•I 222 t7S\NI'= d . SmHB E� N +'O oCOo. NEd.'N8 4"" mFtFg4 FEsEEg vEAVi AN N .-el m m. tna ZE . . �' Ki iJ NNNt7 ETi �'i tns � co E Z.00 OOE7g.Mo digg _ 4.4 mNox*SRgn21m1-0 _ppppaa Ep pp O pWW p 1pp o O,EOOON Ems OtIng�N R Nm W NN pPr 8 V N WOT pRpsSt�2 EWp7�Xt748S EG2g2,2E 0- 1 1 ` OCOOe- t7 tG Na "g a 8 43 BAO.NN REHR REM,' N t _ _ Z a n O G °r `o Y' c aha X 5 5 "n i ce E6Q E a E Cp o in v t[ a g r c p tp Ep p�rp .O p y� W y c ✓ U p Op° V W=1 '.5 p C 0 y KOSOO,e OONIO' SSR : 12MR<N 24;1:= Oy N{.N�t;i1R1 (2R:2�g PMOON 10 M • 9 ; U O .0 W 4 Q 40 e..N Eptyy tt7 O;1N1 ONYf A O ttVV tmmt�7 {{pp m D p Z m 0 O p C E : g (� VtO0W . g6p--O N fn,mh W.Y W W p N •C � 4 O C O VZ 3 Im oliCllfli , 2 d PE8pp8pq 1.°411,74A GNNOO� SNBV-O NIpNN WRPiC71 S::1:8°4 G ' 0g2. SREEo EmmmE BEr:RE AERIE nEm HEE 7 A m m M... E M EORFigs ONNl7N V�F-Nn W ^OONI r4227: mFNE6; S S W g lA...�W,=2.. ND�G C(y. ootO v��OO nt7yy�OO Yf ay op +p tmWp O1OAO.Ol t7 F.(0 7 WNL$ 't,PE.5 S MEEE W OS 17 REM E O Y2AA Ito EEEmo to N I �8p 4 yy R§ F.88f2AT A 1p.O NON W m Mty8tp AtOTPMN N17 mnSS U W O Nt70N A MS 0t1V70.pD um 17 A NA Ont?ED QED I�p N C G 1.. OCNN W tr W W n NNNNN NNN[N..N NNNNN HERE RAM p Q O N N N• � 0 q q• Q V_- W S O 9 =24. E A P2 C88oty$ 7tr.Va gRoZ. .%TtMe aSNM2 tm.E"yy'*gA mmo%'NIZ o N O N RCgeO GCOO� 1VVm' VDr WO' rrm�r NNNNN NNNNN q g yy S A yl .h OO M) N t'•1 N l7 Ri ap0N .A z+. Q f-g. 17 218 ammm !q:A � E m O.a `9ayp 1f - N N N o N LLo a 2 Z Z O o p O p p gm ++ M8.°15 a p� y� p 2 xa 88 RNPmOCE Nr Oat9i S NN O^SS SaA�n70 8 NN1=8 'gnN -E pp AE REE tEA mNar: m'11'.t^.i8 IEEn OI E E Nm�N .7Md am tAD nmm W OI O� N N ARM N mtOA O am WSN O ppp r !n • _ - LIg p� O J j O O Z 8 o m 5 u l`m _ r E 0m.`.- b aa o S O 0 9 0 (W- t 1'U LL W 3 mQ W�f-UJ JU(7 U K� 0 cv 15 r I & k \ ;\ F. / t( § w42 Eg S \\\ . 2 E -■m [ } q; W) 7 \} 2 2E ` d2IET 0_ U) \ 2 1 / ± -® -./., § \ :4,'':4,' ( k 3 » , - � ! r tii« !!°m° - > } �„ m2 o / (@ i co ( - � 2k ; "•..7i.2 2/72 1- ®f$ 2 f- ::: k )d >-5 }k > /�k§ƒ . 2 ! E ]0Eme ! : ! ch z§ ` ) u., o !; ;z 50 8 it co ` i - ! /` o / } 0 PREF y� n �p�ppppp _o arsoaF a REF m.ON83N n 83' m�A l7 P..21N HEW.gvz Nf7 CA0" S mmmmM Mmmo m4mmmo rno APtmO, wmb�ERRgbg DONfmibMg a*448881 `88�`e,88 a J 44'444 TW444 44444 .74444 44444 44444 44444 W444 2 y g4� p o 4v44fa N1A7a FRI" RAS. `a.I4m_a_o .A+o.H 33§ .j nig.' in yNkA pCCCA� bmNa Zbon fD q6p m gEmsQI 8N'4 A '4' - 88p0�pA�p� pp�1hO1 pFp�TpE^ apmez ^Arm,m ,, O i Ol O 1 N N N N 1 V 4 y MFA N O O O N N N NNN N N NNN N q1 N N N 8 N N N 1 V O N N 1'!N .`{N N I`� 000gP o^no^ 0000^ P.PReP ^oPon POPOO ^^000 'o_oQ� N .O ' CNOmeYYv AmS 08 NmmSpp NANgh MQmmNe- NN8ZE TNer-p T4�A =moo. ge-e- c.4' ,MnO {pp083nn.-... m� . .pgcNAiO4s sgsgss0m - N :MI88W tmEg ttE Egss 88884 .N tt88808h N. NmNNNNN t NDb CV. 78 8;;1mmGp 088A1 SAO-188 4000.E nEPf4 r88om 0n31 o - gMnN me-Nmm Aour AIm. 83H017M Oh.zmNAn - MIR2R Willi' MsmmgmEmlm mpg z 2Ogy0nO. N sags mar, . N ...00 .nNN. NNNto YY83NN v . oYf.. ..Y .. . N. N^a8N4� 284 (ON0m MeV:IS 88;38 e.28 8NN0 Q888 05 OOON OM.-00 ONNMN N,OVe N47eNNNO, 0.-.-Ne- 5NOO L CDpp ppyy pp ee .0D83m {pp pp y 7 p m p CO ;E88S N OONt7 A 481700 C00 N 40 n m y0�47 sOf7AED y Y se W 5288 WOOOgO oO.y"j, vmrg 4'e- g714NVls N BA A4 9Nm 8�4R^ O D 4^ p YT .1112 EE 2E88884 nryn8♦P "43.AVo4rf gsmm,1y gsg--AT "�24".'2 .N.841N.8 5.8 0 1 0000.- 'TVNA fYNmr WW:mN 17d 444 28PP2 aSW O MICAm • . • . . • . ,NNN H1VNN CM G J r .- ��� r ----- �� n4' CM ▪p ow pp p q p p1 ..pp vv11 y,Df ..pp pp�� f1�� .p I<�pNn1 W iR O O mz = a J e8g$.N-O (ORIOIYn "flf mmN OlN4O1 N mNNO,OO 2NN1�N L. ,174A A ; �f`Sm$B E= 1eN a o4iooe- Nad vi H..,R 222" `8i�144a m88r ELM Ymf Sinai�mm �ay6 lnprm U O b q q . � N NNFf 1717 OOIfI INON fD lO�h U E .rte 1,' ®2Z• n E Zogrp 11n 2 fig( Q iL V.O O:0,N N O"Af m a,m H O N�v pp pp r�OO YY11 mm yf I(� yyf1 pp op Ip P:183:1, i 4«00ONn OmNE"mf fN8301N r."�mmA 474830 V Nf7 V r8 ell8h Yuri {{��l .3�p Q L ` O O O O e- 47 t 0^N I p M e-p y '4 o p .-v f ERRE! 4 4 N N A "AT Sf O l7 QN40Am Ole-ll4N m01NM N Y NNhINO ER FF= O •�.I L L g O Q 1E7.'6 _'ogen,- 12 c p r C m reg C U o W C m.L 6 C m C Z 4 V 888 n ANty S 0144. V X017 N e' 0.-17. r mgs W , ..mo m 0 O C O� "t.1- 9:2 COOO�t7 m e-N Yf 10 N�.-,(f EO nON t7N m170!r•N �Nr•O� N40M ly O .J V 0 i 0 T i O.O 0 O p1�v ; O O O N A V.;41 p�4 .f m 17 6'I Of m AK.--g Oi e s O m m m ✓ N � m Y QNlf 004 N Nf040N IO 1083.4 l7"�"rn N N 4�0 � N M" O e 6 t G O A o • ` ii m :T.I1,16z �me,u0 a O Z 2 83 sco w ou ori'v8 M > m> 1 1 g 4 m o i S DB 0 j aQ pp pp pp OVlnl1M1nv Q M N N NXa62 ma 8 83 8P "p PdA0 hAMNSL S h0 !- 083N p4. WWW O m ;KM VAmV inn- NNNN c 60 ' yEFR4o 83 8W nppN ;E'-$274 CA.1A8Z 23 m Om 8P Nt7 .4-38;47PGm p N � mai "2" O ^ gmm7- . NO � oo�7- vggv. -.t,.2--- ''2g7-V. I.tom. ':1,4 +n R •• p pp {{VV 11 fO y1 pmp mm ppff pp �Pl 4p ON ` 88A47� 0.17110. D'IMN Ot70Ar 8341`.4 NdhR8 OQ%-- g6-Pe C O- ''2,1F. I0 Mfio a InI,yp 4ry4rypp�j REM nN O OOOi IR 4'p N ;;;A:--g E 4'O'4�N FREER .NNN N 4444 NNN N1Nv IV NN1mV N N NN N 2 - w a a m al? mo. W 9 3 m 4N4 "fi NNC4 C Jpp pp qq N pp O�OAipp 4 A 0 84'44 44083aPs N 8832g.' Op W mm SV a NON o O1 - -00e• N0m w".9V '(-83-10 8300er. NN778 88A782 8400 §W• laNNS� f`'9'4,s. ..,Q�j• 1 ���``$$11``yyyy IIpp A N A O! i m N NNN N 47 2 2 Z O o G ipp pp 0 p p N NCNyy Nf01A m 8MS8 A 2:7 ;rOr0N83p07pN O)N:O Op83N omm Fagg .4RlEREM EZWIppO4NOma0 .NNNNNNV 0 sEY . Krey f' `Cp W O i° om .• co G O.R J 2 >C" L la ° C.c g IZ ”28moa e O Qr 3 L �!ar� ; L ii.1Na E wQ .0 CUalDm a1�1- x049 u 1. � O ii pW SON hd PiP: M hIP; wHP NON p mNAwNOpom,1aMa444A PA WO ONOw=Wddd d OddwW vWWWw oNaN' ••_VV G Oy g1.O51Fq N F.Nms m�in ON NyLM m i SOp Mi 0 DmO i MEM M Nm m OOOCO y00�S8,8A0 nmanr- Ntsmdg 44ggg N NN NN NNNgaNNw NNNNN iNNaW tNNraNwWNw NNENM NnNat NNNNw NNwN Mo O 0 00000 RRRRP 00000 Oc000 00000 nennn 00000 Pnnon RRRRP RRRRR 00000 PPR?. n r n n n n n n r r A n n n A A `rq g% Pii Dlii liW NN m N V DPi P Oh] N Dlii DPi Mlii TSF itIAnm S MEM Haw r-mtrSO.St�S Vtp m ,�S O NA .p N d mr- MV--rag N W W W n pmwM .D 0S r mNM f 0 OM OttOO w Cmw .- mN1O mtOOhN Sm 00� Y SAmM mr r-m M Amdmm mmM NmmM,7 OOpA f n hmN40 O�t'IAm tC EoO R ra•a � OainN NNUS Nm gm,' mmoN am am^NEmSm N24 m4 Vm NhMm Nmn[=1 thDON m mgSMnNmm M NNiNgm mARW S. GREW Rmg 0m 22 00o0m 22222 clop' Nmm m NmSm 2m2E2 22222 Z a gANSa RRNaapa aNNa Naga aaaa gsaa NNaaa N *aa gaTNS VANS N 0..mm mmmO, m0. 0 YONON On0aOSN NO'mT TNAVO NyGN O4.8r-C NmOM.v V '4228SnN8S mId2fM YGpOW ,ONO • CrO0 Nr-O0 00.-NO 0O,OC ONMNM M. 000 OOO,, G2OrO OOOMs N r r- O.Na0a 2E82;3 t.ehmN W 7gn VaN hNmbOmOOA27:T17 m28.82 S,O.ON W 8422R ppNMNm 8SS8S WARE ARE n ^p7mHOOM � NNNAR p044 ,G+MAP, gaps gavgV ggMMM mOYMIRfO �8N00 W' NNSNN INNgf4CMOO'f =CN fmag nE V,22 ONQ W G n4 m,=2 V EuS 00a 47,430A OAOE dXE SP! 1p W,022g N t.12 7.1 NNNNN NNNN mV *"AR oOCMVt r $NIY4y m w p�ae�mm pp�S 1� ttpp0S {{yy fp d V Nm ;EV 2%?*g h tOONNUXS V rcnmN l7ARmM 2%.7.NO u2SOPIN ,.Stmt/OR0 RS*88 284,4A; (�IOOp,r+ST NNONO ::::: :::: :::: m ::: r:::: " AUrNTN EV VW ST mr,ESP 41;it2NM NA 7 trvON ,XONt?m0 AmN O < M rq M+SS o��,0•.N XiMUM . ,v uj� PisH Ennty t°NVD cyi�a,X .113 Acry mNamrn a,Si ONOa aac'oN vwi OaNy tt'��i��y�i Oy m W MO f f YSN ry NNNNN N N N N N NN MM �NS C'SNSS C C T ;OE RI2SR ROV 28 n Nvb2 MOS V 2,7,:=88 ppmNr S 24A mmNSSO mSEISE SATAN NYAN f dNa!mm REm N (D m0 m � S R,V�2NmN 8"8",1 "tl�V 8C�I"d RNmn9 R w O < G2:2"' 2:2 NYWtp aS d n a 0�0g87-al p -.'l D A,O.e WN NNWN NNP4944w.m.-, NOOSOO gEA learmmAu�1RiS ro�O�O+,trmtVV.a n,Syrnmry g,wv �'c,rgEm Stmp`�4°2 ng,'ed,.8T Vm`t�i`8+,tap mdg Oampafmgg W.V2N� urvioa nt= GagEg ,Eiuzga F N MU IMA A W mm 0+�p0y 0a� IMO O tm ii00u'i�,pk Mil OmO A1'OrD,O! m um�t04 m�iO�N 15R UV11 �Om�W p N Ai pm N N NNN N NNNNN NNN,7 l� ch,A.1 M,7M t7 t'Y t7 t7 f.l N1,�),7 WM <Yd V d Y d d d d d d,nNh �N NN mt0 ,01NO,O tO ymkN 0On>SpApff m,N,O0 V'V EOnppawrl ,NOR mA W pp; m0�0 OOANO O�m p2w mAA2Na OAam NO OAS12S f O maOMD tg Oin W 7 RW4N N m W tEp OMD tnn ONI OS ppo; tdtVV P OMO�(��(ff Nm tIgrm vAo1�N ,�AaPn Npmp t�00 RAW R482f2 gseM N N NN NNNNN NN NNN MMt�i aS t7MMMM SASS% a f dd v 4444 Y OOUOSS YSN.SN Ar;SEA mmmm y S84rm EASSN a NN Oq,00m NNt7 SS V,;8An RSSS,O RO Ma0 ER;WA M NN 882 m n 04 r gEMS R8 �8 X888 88M8, � N88 NNS 1 ENN$i 'MEM MET: HERR EMeAA erREN QSVX E N N N N NNN N N N N N N N N N N N N mNOpp�� Etp VZ p� EREuf m wNn W a rr EOpAR m �0,X- EA OSN „SNONO m Oa ON W OmmO NrywwO M aM Q A{wO QIP OCmi>ODO l7 �CS OS O�tXOOA V NN h OY;YO OO<00 8;44; OOpp?; OOOOr- WEA pp m NNNNN 74A87.2 Mdt'i NNNN d d d O V d d i d« �lhMd d dd dd d Mt�IMM NNNNN NNNNN R EN .1 88224 82andWTO1.OS 082N C SSSSN OA00X8886-& RR E0 X w;m IN V A tiNW S d Z NN N N NNA A M NNNro0amTVgg goog202mz0WomMOONgmN NNNm NpppeM MtSt/VA ARM, AMpdd dyfis dmON nnmnm Nnmmp, seams bNmNO .r,•n0 8 CO Nm O S 0 V d O lc§ ' n,qw aaH, u F nHip aNin'o $ ta 3ug.i mpiM m ^U w "9S -o" UNNm erl:Y< 4 8-m0 yNIbm mmYiigmmmaa pioA NEN Ei-EryR JW NNNNpN NyN NNNryN NNN`! NNANNryNNNN NNNNN NNN a T 2222T Y2242 22.222 224T2 2222! 444T2 2:242 T4T22 22422 42222 2242 242T mN a2 r rr „ r r 11 . 11 . 3111 rr 111 . 1 31 . 13 1 . 111 rr a ee {Ny pp O1 awn o O ♦ row.;p m m o 4L-w, a�O W OryM A MI OO Ma7iMV paned awO,n itp7N�py RnS W�2 §enNd N Sp o w.; OOO,Nm bmO7N OY 3 N A N 'O, A.I in 0f ��t'rI a(.r l7 lhNN ,O•D r. E W mnnbm ,fSef tlf 2Yys M gag,RS pq R2 II 2 cl ODr p2n "HS Nq r� 1�gg VOVa pp w p�Vw qq $lai.p ♦Y Opp ♦fe1plmppff `�Naa Fa.8p1 N 104y HN 2N NNNN N-2N N NO.40a NNNN RA O�OrNOIw N W.0101 NNNNN NNNNN NNNN tttVVV ttVV ffNVV N N NNN N O O O O C p O O C O O O O O C C O C P 01 A C O O C C C O O^ C OCC C G COC C O O O O C G OCC O O OCC C C C C O ArrA1, Arnrn nAnr rrr n�Qn rn hnnnn nrrrr nnnnA rhhh ,71 m 2NV• b 2NObfRA NS2Vmbm AmNaob %R2TP, o2ARI a gbrNmt0bg rynag!c pd RR g1rf�•1 N.H MOY,f m 2bwN VSw r(f F,Rbp2wa2blf)m^w m 882,E II W Abh 1 1 81N 221H Hill bNiv2 WI INNw N41 m.. bvbbWYm Nbmb 2W2 22g2g 2222A NW8QW mISA% 22ASg EIPR 02O1A 00228 2nA22 IPp %GATT 2522 EOTp 2"" " ARFN 212" 22"2 '•=g1 AEr�2gP mmhnHA mnIwmnFntin nlnnnGG phOCM whh.n2rntnc eAR L t' 22122% ` mWmn 2 mNwEEEEE EEEam 2N2nP T2NN2 EEb8m 22EE2 4EEEE NmbEE mNEbE EE7b,bE EE2 E NCV G2F,Tmm WVO20 20W2 2 P!."--TV-2 211712T mmi02N ppN9 2 Nmm O”IqA 204m O17Nm - -C , -O 000 NON,. NW: ^ ^20 'M MO" 7 ^' G e-fMYd OnMp ' CG *538E4 538EC eAnsA.O TRm8 2 8 4nInMG OD N4 m waRyl M Nm O217 0 0O,wO m.w O Q ,n CO N N W nm h�N 2VPiNb aT 2 OO 222:S2 G2212 88N mVwW ON2nw Mmep0 V 02 • AsA � W?n� �AX22NNNNN 4YM4M 4m949 Y� 44 9wWT4 4444r 'f4T4 Z rN d A O 017170 N Q. 201 2A n 2m OOM+Na r . rNt!t 16101201Or r10^gg OWAAS :::: :!:: ::::r ::::: :::: w�^ "YR ��mmm m :::::O 2^bOW d2OnMW 2wpNA ONnb N n Q 2 A 0 NgMNN 2fO1WO 1pprR N1;Firy ;R2W4 NN G tO RSATR gAWb8 E m8 Iasi, aNsCli j 6 6AAAp22 222 2.MM2 .fm OQ<0 bbfYm Q`mYf 220m Q a p 22t2.2 (V 1y �y p Y pp�p p rO C i•n 277-ARS {1rl d rf2§i22 wwiQNmO m ��1y7SO�myh 3RMMEM� M1A roan pN rON<1V,W OY 080 1W O W 12,0 ,T V ONN 220mgI% 1,20.1 R W 0 MtiN i0V 2ppla 2N SHR Vw AAy^ I�.8217 uYRON V2 R8222 TTRSpN MN. �p1p 17221..1 b �(�V M 1�f 0 A �9 {2 t2�Qgp An 2 0S ANNN 17170 Vp V Nr0(l OHrO0 wt0 :41 O V 000 O. b N 129hNN t7 t7�171717 MMAAM AMOY`Y Yf f f f dY Q! $$ 100 f0Q Q mf ae mnmul"iw C R UW E�.2 T npp YY mm N W Ipp m OWrfmg wm0yy I 0y AN0 N2 rQr AO R S 22223 mmNm0 20D0g ANC ON 2;223 2282 mL8 g EEM ry0N00 FIRM WU_E hbNC< Nm Nm pwmm 2-M6RH EiW7 r • r . r r . r r • • . • . , • • r r r , r r , r r r • r • • • . r r r r , • r r r • r r r r , . • r • r ff9 a SC0T4 sammy AgVOO SWAT O8822 22222 2g2,22C STIyn �pTS2 4I24 s'2'22m N§A2TNAAw4N VI2 1 YIbW2 oNMMQggaiyWaMMa Ohls 22Z2 2. Qm ggg. aha 2222 2.m.. .2222 2222 2a2 A W N06 2:283 MN2Y C 2 0 M m w NlDO 22222 m 0pll��A 22222 20bM 07.22 28,1%2 wY M b w O lh U� 2-a0w 2hp51,;,10 22M 0 220 m ^mm VRRA: N NiS . 2 . E22mn mm2Ag 2022 222%2 ODmm22222 22m.. 2222 22m2 I rg N n n vel $2A21 g67-=2 C w'm ON 0 N 1,5 2 NN0217 hbE0102 TsrN hm Ve w A$ N.0M2 vM12012 H N .- �Nl tV 1R ppp 1V RlaO NNN<e" EpEppp c'f�. mm{p 1ryy N N N N tm�l N N N ry N N N N ry 1Qv N N NNN N N NNN ry N NNN M N NNN N N NNN N N NNN N N N 00222 262V2 2%2I2 01Nm 828RA 2 AOOmm 288W; 22222 AORC0 20h 10n 0 NOA.O= Ot2N1O 222 0 N1CN0NwNNNNN NWp2OM1,42mm2, OmO+V02m22mppppp0 get; ma T 109 22I.tN vblA m h g f�1p42D�2s 22225 21Op'`1�A TA2 :822m P2822 n N W rdlf2 n Hill vT rf0012 %%PA% T OAR V W^ {ph1p�llll1 lfa1� yOH .EDW Mil Mil 00101242 11Op�f00 00000 00000 00000 {pop 0f0V 1)01 m0 Or�O mO^1 Ib. Nl�nl�W EO W mED ED ED W f AjMw 0O` t0 ITA E000m0 O t� OC � CO N d E 0 E 0 1 c � n 0 U, 0 O m "222 �C° W 82 "221 2212 pM2 114 m Will ml N N n^4 M d ° E A m g00 m :Mak m a n OO O Mm m 4y4a NmOMll^ -A'4 A. nMYPA.M22.2 = OOC ms 2zm,4m2222 WWgNW mah 282m mn . VigNNN8Wmg41 1 " AY282 41E2 g NNNNN NNNNN �� gN gggNN NNNNN NNNNN NNNNN NNNNN ggNN N n NgggN NNNN am 4 44444 44444 :44'4 Y422N "444 '4<l 4 44444 T 4 4 4 2 24444 44444 4 4 W eaae a 4. ;;,1 2dd 22AmEm 21:422 yyOPY' Ogi�ff N VpHUh NmmB� mnNmMtQfN E f"? ry Ap PIP RW r11 Va EnR HPJ !J;h $hH HP] TTmryOW mm 2pp ppEX m NNNN NNNNN NNNNN NNNN NNNNNO CC C C O^C C O CPP n C O P n P C CCC^ 0^0 0 y YN) MW 22 ZE'4.1 nomi pn83E ry8,g,SVrSSE2 mooem em2 M2gEe NffiES o r2VE S mn w4i`D P AmM N8844 322Pr 2888P 4842m Ram YmQ22288 vpvim4..mpaigm st s Ngmm2.WNNNNfg2121218'22 "222 2ggY22222 120222W .mm.222222 2.0.2 2.... 22mm2 YNmm mm... 222PnW F06" MMr7aO NNNNm 2244 2pnM M EO 8A N 4ON OO NN4NN °YS4bOMMOO 82PP m 8P888 7.8422 2824 'RS N4 rmNmm ss NMh-- 2' N42 OnnmalgN 52222 NSP" 72842 MgNN rn r002222 sFgEE mryoss gasat EMEss a NE-WO22222 2222 W 20022NMge, o.wm upOmE0O 2 .o mmm2m mm2 2N22m 22222 2.2mm 22222 2.222 22.2. WNmmo222 j m 822822 Mmmm2 nIP78 g8AP . PSAV oGv4M TP2AM 4gV oA giGAA. 822e8 rioo 08r nONn ( �( NA O OYM OtlrCm YmCm2 nOmnN OOrm0 ONO W mA W A2PA 2841.34 mY o?449 28�Yi.4 0V 4M N 82832 Q82 'R292R „NOnte NRO52W 4.284P NOP22 0M0r V 8 O PA2W rn Nd NO 2N44^ MNNmO 22Egt mEnN 'Amfd pAWAZ MOM ON8NO Np2ON NAM2M NM2 80 Mn0 AAY44 nm999 999m Ymmmm m4444 4;44M NNNNN 222mW ?'?S,tm'. d9 , zmN nnms P722v$3armmm%A8422 4NNg ;44P2 PNS4P8$mNgn 448PP NVOmm 8222 222 8AiI 1-PPR.2 21.NYFrigmi22vMION V2.4plW2m M12O'42IPONNNN rNgN NNNN N NNNNN NN"*' pp8p ;AMM8 A }AP fD 1m4 4R4,88 AV.:22_ 24P�p 2nNrn 2p m2 44242 Nrm a miner m dm Mm m�D NOd d 28RPA A�tp7 .-V,Nd m d2,1��OOOG pap0I0N AO�r� 012222 O 22(72 NQ?r O yy5 N 8''' 82 : ::: n^ W 2 2P-r Mm Nd 4'22 '988g1m m2 O N EP" 2 : :: m rtOimmmN mm�rnWO� x.nmm mmmmm 24(222 mmmmm o. OS Oe2d.ra `w T5 4 4 ,0f% 42A M W PNmtrf mmNAmpmOHtd7OmnO N x0 pa n 22202 820m2 NNm82 O Nmmm P28A Q .'.GM Igg$1,r 2Ar0 p2-ng ^NgNN 2422 P4P20max mMnnm pas O 11222 opN244 44222 mmlpO01'2 22.O8. Nddmm2222244422 AnPAA pp YI Wm? mnryar° 222P2 27,822 St:mr'.o4 Oa�S0R4n 8i oo�n 888POi 22 v212P 48P44 mMi�r 222m2 r254 0 VV822aEgp4P4613P < ' A41Aoa u M waAgggE:o2m2 '72m o 44N^ mmorr 1' ' 2 3a N222A yPNNN PV7poV 4422SAVN24 P4224 8r488 8N42P yNMPm dTR8 28000 8,8r F eMNdMM M7A8N 8282A MMm80 4'1" O8 88444 848 N288 A 2 21 22 22202 2222 2 2222E sfWm miffs 2E222 2E222 12222 22222 Emmmm m4m2 � �p {p 2 2PYI m.- PN2'm y 2N m2 O.OM EgSES 2m%rM02 h AONi fO NYNmb 427-41S r2nbM2E 2t2NO 22+ V m0 d dNOMINO 4�mAm O W mil V Yf O (7 Mil lh0 C2lMmt4"12 Hill M�mm2 �p mm W 2 aaC�Vnp YJ QmMy NelO Ott Oi t2+f0 ii Vmy t7 t7�t�1 t�1M At+1 40Y0 IPA P 2 mmmmm :mmmm 22222 mm d mm ; maD�23 mm22i cim W W iiiim02 mmmmm mmam02l mmmm m pW�Im2mm �I�p 11A0 {{��(� yyII p {{ppQQ♦♦ 3• t8•l 2:2 84 241,120 ;828 V (.(4288 O V 8R2 W A4A8 r m2d PROP N I4RINrl mN V,MO V NN220 N 4122 f n AA222 ObmbO 32P22 22244 44448 MM8NN NN V RA V RVR N NNNNN NNNNN 'AMR -° P E rA37,m OOhM W ONN 4 N NA SSE E N2m O Odr 2N2m gEt,P PONE4 4.200122 022W8CI 401 f4VrvN0 gt=SS E 8282E mmmm. 82222 888442 42m28 ;44618; 222R; mmmmm 22R;; rnBJmmm 28232 8822 208 P8228 P28 2824d 84222 38224 284201 HMN R8 4ON a O n Pd 28 Ag;84 884P2 2288 u'1 ppI gp dd �8��rp1 AMA 0mi A rthO tm�I m�4�pp 0C O ygy thmA 44m88 sa gis.a NgYI �$Q V4 EP 4P �jI E 822 2'70)401 VV 2 t" O OJO�Oo ^VV'N `t7^N' 00Nm P m iO4M P ^mVmE O12EN N "'NNN N NN N NAM°, NNO W W m GG �� NMS �I�I�� 8 0 E� C V o { / 2 o -Sc - / 2 CO Ug FriT` \ jk§!27222 ® ! ((22\22/2 ! m! 2£ f\} { \}/)fE)8}2 �'43(\ ( ; >33z 222 / , mm- -m ` k ,11 \ w ` °§!#§\$ E I !L ; 2 co fg f\ \ ® \ 2 _�_�� > 11)1‘2 hCt ƒ� 13 tk}\) I— $3!3!!!I/ 2 - _ ;;:»;7:7! k} ` kk &\/ _? s = CO ! }/kk \ g, E )Sema !` ) §`§E'i $/§ .4E ` § mf_.....§ | ,z; i ) k ) 2 \ ƒ`■q¥R##4§q °k§))\§\) ( ,4� \ s£ s }k� 9 cd/ < ) / L 0 \ 2\ aio 0 ` � ' � • •: � .. 7 .4,,~�� Schiumberger�� u� ���� � �~ c�~� � �^ Drilling&Measurements MWD/LWD Log Product Delivery Customer BP Exploration(Alaska)Inc. Dispatched To: Christine Shantzer(AOGCC) Well No Z-66 Date Dispatched: 25-Mar-13 Installation/Rig Doyon25 Dispatched By: E.Greblova Data No Of Prints No of CDs Surveys 2 1 Please sign and return to: Analisa Steger Received By: BP Exploration(Alaskal Inc. potrnmnom,mData Center<LR2-U 900 E Benson Blvd. Anchorage,Alaska 9950 Fax:907-564-4005 e-mail address:analisa.steger©bp corn LVVDLog Delivery V1.0,O1/2Y2O1O N N O ! !PU) ! PJ q 1G0m000m m0mmm 2N222 N22 NNNN J d p4 W d a ttt4 tdtod tt Ott ttttt .1.1444' dW44d L C� ,00 Mil WIO d1apr0�mNy fl!J 11 JPJ 2C')NOblr02n0� 2iH2N1171h 2 2 W N�11^111 11 11111 11111 m 1111N N N N N N N N N N N N N N N N N N N N O G p C C C o CCG G C CCC C C CCC C C O G C C C CCC C C CCC C N nnnnr nrnnn rnrnn rnnnn nrnnn nnrnn nnnnn N C Vm.ngmm Mm18E NN2n O Nm544 dMOminO NrE2m =N0:1-2 O" mmm mm2mN NOQ1N 0mN1r 100f002�N Rfig )r Nm272Dm � wW hill ����� MIME LOB 1111 ����� ����� U) 0))NN NN U))Nb N NNN2 210 NN2 NMN N2 22222 22222 A__, O CD C ';: 02 mO)Yf mM N.218X 6-,02 <18 n 0 N,-,gI q..84.34. HPJ rNMn$g:&, 82F,Eg RREPEEmEEOmHIRE fAmEse; mggggg gmt o :3ceeN Coimeo CNNo)N ui� ION t Noi . .1. 6 goi2228 o Clap p p p a pp OOOON 00N0r N220m 14R2N NOE(Np02) 2tm+)pMait02 N.tO)Nya C COOO OON ui aCM . '7d mNM /N r, AONd2 0NNNN gMto+ C)v CO EE 2 -8885,".5 nNN2 n 5=5:5:2 WONMd Om001 P1V28 p ap 8 W 2 O 66667q"ryVVNmr g0' N N20aEmrr r22 _ m N q • i • • • • • • • • • • • r a_ w� j 2 I _. m 71 .W 8p WW C (OO r=883:24 22100&P 2250/8210 2WO2 Cd r2 i(N)NONO OpV.�Oa. Y2nNaVg l•')Opd mcicsicticsi ONE m U t L W W N C gig L a p 0000- N<CICN2 02211 O) it�t0•)O g8 W NN NNNMaO 21d0 V E$6-12==. m . r N o. W v N E?Q m8gm:szo,bo vx. N N_ 622g2.22121-02; o 2=828,N 0 N 0 s m m 0 2 0 0 2 0 m 0 M 0 d p r g4.12.:28 0 2.m m Q O n m N 0 m 70e05-4 2 n N m d N O N 20 O M N O O m m O a N N N MIC t L Q O 0 Z AO L W g6 Y. o L c C _ 10a M U Q E rn> > 0 012 o e g t d p a OO�� y 'D c yr V O 0 y'.0-.C IL U Q W C d 0 W W•n8�8 <Q2o a 02 N 2d p2ppp N C0d2 OIH 2l�Cl 2Nd m{p2p n p{n�p 10 fp0p 2 0 U).155 W O OIO 0 0 d j E V U) 00909 OON N. N NN1 d 2NOr 20 0�22r gj N NN2 lN•)f71dd m U W W U i+242 5 0 0 ' 0 d m WT_U U Q 0 C C T. C C C L O V V t c o o a m.. W 0- rn C v a u 2'>>f i-o 2 H f f 0 2 z o l-3 p p pp pp {p 'AIM:, �y ((pp AA ppp� a w m j t0�Oas o01U)m Ipg N2aNp NO0O 66 .Nm�O 2'ANpyO�mpO�, 0N0AN Oapm) 0^n4 i 0 ~ O "2 N 8 2 U N 1 I E m N W O N N N N g O V H 100 N I 1 1 0 1 Em0 O)W 3 N //— pp 2p p I0 m E M N=a ry f0 mE ONN2QN, d.taN� 1sa 102 aOIgO W 2gN00� 800122 2 W �> T'97"".1- 'O Amn f� 002002 W w0O'ccSuir:2 (6g,;010, O-g gt.3 ,..200200 2002,.. n N M M m 10 m r r m m N LL N W n m n .;:.= S 82Pgam22og na22g gMgioamrgmn g.T.04g,% onv 000NH Igg6i8NNN2NNNpN pNpNNNNN'O E .-.-... NNN NNNN NNNN NN O 0) gaits ~ Q Q gU2 0 g) WO aaw o .. ; .• y pp ( p 2 pp qpp� [7 Q C _,%15_. C ��ON00) Nmm'O)1 2a0N 2<)ON0 0OAIN•).2M0. nn2r W N O)O) �nyN G p �V,241 g ,9,7 “y _ OCOO,- NQII WW m,00' 'mmr. NNNNN NNNNN NMMt'�b) O 5 W m g c';--.7c,.8. - 2 W 2 pp 2 S m N Q'o e Q uwm m am u)n N d A 2 91aCNn0nE 0 2mNNQiOZZOC N g 82888 22224 202W N 2 41 NN p�11 228; O WN210 02028 0r8022 2 - N8 mS8N MM01 AO222 VNN y2 2OOr00 02E gltigfff N 0 0 y Q __ d Y N to p f J O . m c la ei y E ... ..01.2-.0° . ¢«v_ o a r 0_229 . r .0 C 2 t >a<.—co:iE ga E r ca : Z �r Wo 10(0,3 E wa 2 V li N 3 N0 Q N N f U J J V(7 8 'Fc3 U) 6 3 0 2 co EN2§ f kkk . m ni ƒ EFo ( (k§ % o a £ % co -;|; V.2 1:1- - ;o, 222es § in in x CCI 2 � k\k Ii k "8� g 0 Tl ° i! \ co k ) to 0 E - oa a RECT""3".: D t!lAIM 41111; SChIUMberger0(‘) )N 1 (215 AOGCC Drilling&Measurements MWD/LWD Log Product Delivery Customer BP Exploration(Alaska)Inc. Dispatched To: Christine Shartzer Well No Z-66PB1 Date Dispatched: 25-Mar-13 Installation/Rig Doyon25 Dispatched By: E.Greblova Data No Of Prints No of CDs Surveys 2 1 aa Received By: ' JAHN Please sign and return to: Hector Echeto Drilling&Measurements DSM 2525 Gambell Street,Suite 400 Anchorage,Alaska 99501 hecheto(&.slb corn Fax:907-561-8317 LWD Log Delivery V1.0,01/22/2010 Hunt, Jennifer L (DOA) From: Lastufka, Joseph N [Joseph.Lastufka@bp.com] Sent: Monday, May 06, 2013 2:34 PM To: Hunt, Jennifer L (DOA) Cc: Ramos, Tania ((Udelhoven Oilfield System Services (UOSS)) Subject: PBU Z-66/ PTD#212-195 Hi Jennifer, Please reference the following well: Well Name: PBU Z-66 Permit#: 212-195 API #: 50-029-23482-00-00 Jw Date of Test: 5/04/2013 Type of Test: IPT (Initial Production Test) Choke Size: 120 Choke Unit. 64ths Production Method: Flowing Duration (Hours Tested): 4 Top Reference (Top Perf MD): 10126' Bottom Reference (Bottom Perf MD): 12697' Tubing Flowing (Pressure). 400 Casing Pressure: 1540 Total Test (Rate f/O, W, G): 550/ 11 / 1752 24-Hour Rate (0, W, G): 3299/63/ 10511 Gravity (Oil, API): 26.3 GOR (Gas-Oil Ratio): 3186 This well began Production on Method of Operations on this date: May 1, 2013 RBDMS MAY - 7 2013 \ OF T I 7 s7 THE STATE Alaska Oil and Gas f�. --�_����M °fALASKA . . - == C©rise> Vati011 s�dn wh GOVERNOR SEAN PARNELL 333 West Seventh Avenue OFD Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 Ken Allen Engineering Team Leader BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z-66 BP Exploration(Alaska), Inc. Permit No: 212-195 Surface Location: 4295' FSL, 2817' FEL, SEC. 19, Ti 1N, R12E, UM Bottomhole Location: 685' FSL, 971' FEL, SEC. 24, T11N, R11E, UM Dear Mr. Allen: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner A__t6 DATED this day of January, 2013. cc: Department of Fish& Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED ALA OIL AND GAS CONSERVATION COMA ,ON �� 9 2012 PERMIT TO DRILL 20 AAC 25.005 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil + 0 Service-Winj ®Single Zone - 1 c.Specs 'Vw s rsed for: 0 Drill. 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates 0 Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5.Bond 0 Blanket 0 Single Well A 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193. PBU Z-66- 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD • 13594' TVD 9013'. Prudhoe Bay/Prudhoe Bay. 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number). Surface. ADL 028262&028245' 4295' FSL,2817'FEL, Sec 19,T11N, R12E, UM Top of Productive Horizon 8.Land Use Permit: 13.Approximate Spud Date: 3242' FSL,2176' FEL, Sec.24,T11N, R11 E, UM February 24,2013• Total Depth 9.Acres in Property: pv-8 14 Distance to Nearest Property: 685'FSL, 971' FEL, Sec.24,T11N, R11 E, UM 2660— /V-II i� I 2650' 4b Location of Well(State Base Plane Coordinates-NAD 27). 10.KB Elevation above MSL: • 103.15' feet 15.Distance to Nearest Well Open Surface: x 599861 y-5959100 Zone- ASP4 GL Elevation above MSL: . 56.2' feet to Same Pool: 180' 16.Deviated Wells: Kickoff Depth. • 300' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25 035) 1..b II2o` Maximum Hole Angle: • 97 degrees Downhole: 3895- 3$Sb Surface: 369 29S-9 101 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD 70,A0_ dItY-r) TVD (including stage data) 42" 20" 94# H-40 108' Surface 108' Surface 108' 260 sx Arctic Set(Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-M 3599' ,Surface 3599' Surface 3128' 1346 sx DeepCrete,408 sx Class'G' 8-3/4" 7" 26# L-80 VamTop 9872' Surface 9872' Surface_ 8613' 489 sx Lite Crete, 184 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr80 , Hydril 3872' 9722' 13594', 8478' _ 9013' Uncemented Slotted Liner,Swell Packers 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft). Effective Depth ND(ft): Junk(measured) Casing Length Size Cement Volume MD ND Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth ND(ft): 20.Attachments: '0 Property Plat 0 BOP Sketch • 0 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval. Commission Representative. Date 22. I hereby certify that the foregoing is true and correct: Contact Zach Browning;564-4664 Printed Name Ken Allen Title Engineering Team Leader Email Zachary.Browning@bp.rom Si•nature Z,,..d 4 Phone 564-4366 Date /� // /2_ Commission Use Only Permit To Drill API Number Permit Appro I See cover letter for Number: Z( 9 5 50- O Z9- Q3�/$'•� - OO-00 I( � other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas Id 41- j� contained shales: Other: 35a�/�S� `J 6 �C� ~ /� Samples Req'd ❑Yes I'No Mud Log Req'd: 0 Yes [f-No pa aTj� f`y,.s,,,,e � O -- /000 H2S Measures: Elf Yes 0 No Directional Survey Req'd: E 'Yes 0 No ,L&-L ZO AAC zs33 E3cing exception req'd: 0 Yes 'No inclination-only svy Req'd. 0 Yes lallo i APPROVED BY APPROVED BY ilf COMMISSIONER THE COMMISSION Date /14 -7./.......•> Form 10-400eR. 10p12J I termit is valid for 24 months from the date of approval(20 C 25.005(g)) Submit Form and Attachments In Duplic 0, ' To: Alaska Oil & Gas Conservation Commission From: Zachary H. Browning, ODE Date: December 18, 2012 Re: Z-66 Permit to Drill The planned Z-66 well is currently scheduled to be drilled by Doyon 25 in February 2013. The grassroots well is a horizontal Ivishak producer. This well will be drilled by Doyon 25 using their 5000 psi four presenter BOP stack (3 rams and an annular). The BOP rams will be tested to 3500 psi and the annular will be tested to 3500 psi. A detailed operations summary is included with the permit application. Below is a brief summary of planned drilling operations: 1. Move in Doyon 25 and function test diverter. 2. Drill 12-1/4" surface hole to 3599 ft MD. 3. Run 9-5/8" surface casing and cement to surface. 4. Nipple up BOPE and test. 5. Pressure test surface casing. Drill out the shoe and perform LOT. 6. Drill 8-3/4" intermediate hole to top of the resen.oir at 9872 ft MD. 7. Run 7" casing and cement to 650 ft TVD above NA and pressure test. 8. Drill out of intermediate shoe and perform FIT. 9. Drill 6-1/8" horizontal production hole through Zone 4 of the Ivishak to TD at 13,594 ft MD. 10. Run a 4-1/2" cementless swell packer/sliding sleeve production liner. 11. Run 4-1/2" completion tubing. Sting into liner tieback sleeve and set production packer. 12. Pressure test the tubing and the inner annulus. 13. Rig down and move off the well. In addition to a planned well summary, a directional plan and proposed completion diagram is attached to the permit application. If there are any questions concerning information on Z-66, please do not hesitate to use the contact information below. Zachary Browning Office: 907-564-4664 Cell: 208-301-2214 Email: Zachary.Browninga@bo.com Z-66 PTD Page 1 12/18/2012 Planned Well Summary Well r Z-66 Well Producer Objecet tive Nishak• Current Status Grass Roots Well -Conductor Currently Installed Estimated Start Date: 02/24/2013 Time to Complete: 36.5 Days Surface Northing Easting Offsets TRS Location 5959100 599861 985' FNL/2816' FEL 11N 12E sec 19 Northing Easting TVDss Offsets TRS Tgt 1 5958044 595640 -8505' 1986' FNL/2097' FEL 11N 11E sec 24 TSGR Tgt 2 5957992 595562 -8675' 2037' FNL/2176' FEL 11N 11E sec 24 TSAD Productio 5957253 595135 -8810' 2771' FNL/2613' FEL 11N 11E sec24 n Tgt 3 BHL 5955450 596800 -8810' 685' FSL /971' FEL 11N 11E sec 24 Planned KOP: -300' MD/196.9' TVDss Planned ' 13594' MD/8910' TVDss TD: Rig: I Doyon 25 GL-RT: 47.0' RTE (ref MSL): 103.2'- Directional — Schlumberger P18 KOP: 300' MD Maximum Hole Angle: —39.63° in the 8-3/4" intermediate section 96.96° in the 6-1/8" production section Close Approach Wells: Z-66 well plan fails Major Risk Anti-collision with the exploration well Highland State#1. This well is abandoned with cement and has been Minor Risked to pass 1:200 rule Survey Program: Surface' to —1400' MD = GYD-GC-SS (single shot gyro) —1400' MD to TD = MWD+IFR+MS Nearest Property Line: 2650' - PBU boundary Nearest Well within Pool: —180' -from Z-33A a Z-66 PTD Page 2 12/18/2012 Formation Tops & Pore Pressure Estimate (SOR) Estimated Depth Fluid Most Likely Formation Formation Top Uncertainty Type Pore Pressure (TVDss) (+/-TVD ft) (for sands) (EMW ppg) G1 255 ± 20 No 8.40 SV6 1020 ± 20 No 8.40 EOCU 1590 ±20 No 8.40 SV5 1665 ± 20 No 8.40 BPRF 1850 ± 20 No 8.60 Hydrates _ _ _SV4 1785 ± 30 below BPRF 8.60 SV3 2255 ± 30 Hydrates 8.60 SV2 2455 ± 30 Hydrates 8.60 SV1 2750 ± 30 Hydrates 8.60 9 5/8"surf csg 3025 ± 30 Wet 8.60 UG4 3065 ± 30 Wet 8.70 UG4A 3110 ± 30 Wet 8.70 UG3 3445 ± 30 Wet 8.70 UG1 3855 ± 30 Wet 8.70 UG_Ma 4165 ± 30 Wet 8.70 UG_Mb1 4215 ± 30 Wet 8.70 UG_Mb2 4275 ± 30 Wet 8.70 UG_Mc 4370 ± 30 Heavy oil 8.70 SB_Na _ 4445 ± 30 Wet 8.70 SB_Nb 4475 ± 30 Oil 8.70 SB_Nc 4500 ± 30 Wet 8.70 SB_Ne 4515 ± 30 Wet 8.70 _ SB_OA 4640 ± 30 Oil 8.70 SB OBa 4705 ± 30 Oil 8.70 SB_OBb_ 4735 ± 30 Wet 8.70 SB_OBc 4785 ± 30 Wet 8.70 SB_OBd 4835 ± 30 Wet 8.70 SB_OBe 4905 ± 30 Wet 8.70 SB_OBf 4960 ± 30 Wet 8.70 SB_OBf_Base 5010 ± 30 No 8.70 CM2 5345 ± 30 No 8.70 Top 5900 ± 30 Poss O&GCM Overpressure 9.50 CM1 5940 ± 30 Poss O&GCM 10.00 TLBK 6230 ± 30 Poss O&GCM 10.00 Fault#1 Highland Fault 6530 ± 150 MD 10.00 THRZ Faulted ± 30 Poss O&GCM 10.00 TKLB Faulted ± 30 Poss O&GCM 10.00 TKC4** Faulted ± 30 Oil Possible * 10.00 TKB/ LCU** Faulted ± 30 Oil Possible * 10.00 TKA4** Faulted ± 30 Oil Possible * 10.00 TMLV** 6630 ± 30 Poss O&GCM 10.00 TKNG 7270 _ ± 30 Poss O&GCM 10.00 TJG 7300 ± 30 Poss O&GCM 10.00 TJF 7620 ± 30 Poss O&GCM 10.00 " Z-66 PTD Page 3 12/18/2012 TJE 7860 ± 30 Poss O&GCM 10.00 TJD 8085 ± 30 Poss O&GCM _ 10.00 TJC 8260 ± 30 Poss O&GCM _ 10.00 TJB 8365 ± 30 Poss O&GCM _ 10.20 TJA 8420 ± 30 Poss O&GCM 10.20 TSGR 8505 ± 30Yes Gas 8.53 7" intermed csg 8510 ± 30 Yes Gas 8.53 TSHU 8530 ± 30 Yes Gas 8.51 TEIL 8630 ± 30 Yes Gas 8.44 TSAD(46P) 8675 ± 30 Gas or Inj. Water 8.40 45N 8700 ± 30 Gas or Inj. Water 8.39 44N 8730 ± 30 Gas or Inj. Water 8.36 43N 8750 ± 30 Gas or Inj. Water 8.35 PGOC 8762 ± 30 Gas or Inj. Water 8.34 Yes Oil/Gas or inj 42N 8780 ± 30 wtr 8.31 41N 8810 ± 30 Yes Oil/Gas 8.31 41P 8825 ± 30 Yes Oil/Gas 8.31 Invert(41P1 8850 ± 30 Yes Oil/Gas 8.31 Revert(41P) 8810 ± 30 Yes Oil/Gas 8.31 Invert 2 (41P) 8850 ± 30 Yes Oil/Gas _ 8.31 Revert 2 (41P) 8840 ± 30 Yes Oil/Gas 8.31 31N Revert2 8880 ±30 Yes Oil/Gas 8.30 POWC 8885 ± 30 water 8.31 TD 8910 ± 30 water 8.31 Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD/ TVDss MD/TVDss 42" 20" 94 H-40 - _ 1530 520 108' Surface 108'/4.85' ' 12-1/4" 9-5/8" 40# L-80 BTC-M 5750 3090 3599' Surface 3599'/3025' 8-3/4" 7" 26# L-80 VamTop 7,240 5,410 9872' _ Surface 9872'/8510' 6-1/8" 4 1/2" 12.6# 13Cr-80 Hydril 8,430 7,500 3872' 9722/8375 13,594'/8910' 521 (-150' lap) 9727'/8379.7' Tubing 4 %" 12.6# 13Cr-80 VamTop 8,430 7,500 9727' Surface (-5' into liner TBS) v Z-66 PTD Page 4 12/18/2012 Mud Program Surface Hole Mud Properties: Drillplex AR 12-1/4" Hole Section Density LSYP YP API FL Chlorides Funnel Depth Interval Viscosity 2x3-6 rpm Ib/100 ft2 m1/30min mg/I ppg sec/qt 0'-3599' MD To Section TD 8.8- 9.4w 30-50 45-80 NC <1000 10.8 60-120 Intermediate Mud Properties: LSND 8-3/4" hole section Depth Interval Density PV YP API FL HTHP FL MBT (PPg) pH 3599'-6492' MD To -500' above 9.0 - 9.5 ` 10 - 18 18 -28 <6 NC <18 9 - 10 Overpressure _ 6492'-9872' MD y 10.2 - 10.410 -22 18 -28 <6 NC <18 9 - 10 To Section TD Production Mud Properties: Water Based Polymer Fluid (PowerPro) 6-1/8" hole section Low Shear PV YP Depth Interval D(ppgjy (cp) (Ib/100ft2) API FL Rate MBT pH Viscosity 9872'-TD MD 8.8-8.9 " <12 10-20 >10 >15000 <4 8 - 9.5 Logging Program 12-1/4"Surface: Sample Catchers - not required for surface hole Drilling: Dir/GR/Res Open Hole: None Cased Hole: None 8'/4" Intermediate: Sample Catchers -as required by Geology Drilling: Dir/GR/Res/Neu/Den Open Hole: None Cased Hole: None 6-1/8" Production: Sample Catchers -as required by Geology Drilling: Dir/GR/Res/Neu/Den Open Hole: None Cased Hole: None Z-66 PTD Page 5 12/18/2012 Cement Program Casing Size 9-5/8" 40#, L-80 Surface Casing Lead: Open hole volume + 250% excess through permafrost and 40% excess below permafrost. Basis: Port collar used if hole conditions dictate Lead TOC: Surface Tail: Open hole volume + 40% excess + 80 ft shoe track Tail TOC: -1000 ft MD above casing shoe Total Cement Lead 445.8 bbls, 2503 cuft, 1346 sks of 11.0 ppg DeepCRETE, Yiels1.86 ft3/sk Volume: Tail 84.2 bbls, 472.7 cuft, 407.5 sks of 15.8 ppg Class G, Yield: 1.16 ft3/sk Casing Size 7" 26#, L-80 Intermediate Casing Lead: Open hole volume + 40% excess Basis: Lead TOC: 650 ft TVD above NA, -1000 ft MD below surface shoe Tail: Open hole volume+ 40% excess + 80 ft shoe track Tail TOC: -1000 ft MD above casing shoe Total Cement Lead 160.2 bbls, 899.5 cuft, 488.9 sks of 11.0 ppg LiteCRETE, Yield: 1.84 ft3/sk Volume: Tail 40.56 bbls, 212.8 cuft, 183.5 sks of 15.8 ppg Class G, Yield: 1.16 ft3/sk Casing Size 4.5" 12.6#, 13Cr-80 Production Liner Basis: NA-Swell packer/ sliding sleeve completion Surface and Anti-Collision Issues Surface Shut-in Wells: There are no wells requiring shut-in due to sub-surface anti-collision or well house removal to move Doyon 25 over the Z-66 conductor slot. Hydrogen Sulfide • Z-Pad is considered an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level Z-20 18 ppm 2/8/2012 #2 Closest SHL Well H2S Level Z-46 20 ppm 6/20/2012 #1 Closest BHL Well H2S Level Z-06A 6 ppm 6/21/2012 #2 Closest BHL Well H2S Level Z-67 80 ppm 5/5/2012 Max. Recorded H2S on Pad/Facility Z-100 120 ppm 2/7/2010 Other Relevant H2S Data H2S Levels of 0-120 ppm have been recorded at Z-pad Z-66 PTD Page 6 12/18/2012 Faults Formation Where Encounter Fault MD Intersect TVDss Throw Direction Uncertainty Lost Circ Intersect and Magnitude Potential Fault#1 Highland State Fault 7,684.0 6,530.0 SW 400 ft. +/-100 ft. MD Low (uphole penetration) Fault#2 (Ivishak) 12,500.0 8,842.0 West 10-20 ft. +/-100 ft. MD Low Fault#3 (not penetrated) n/a n/a SW 10-20 ft. +/-100 ft. Low Fault#4 (not penetrated) n/a n/a North 10-20 ft. +/-100 ft. Low Fault#5 (not penetrated - Highland State Fault south of n/a n/a SW 400 ft. +/-100 ft. Low Ivishak target polygon) Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at e DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal/ Contact the GPB Environmental Advisors (659-5893)f/guidance. Well Control The 12-1/4" surface hole will be drilled with a diverter. The 8-3/4" intermediate and 6-1/8" production hole will be drilled with well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3500 psi. BOP test frequency for Z-66 will be 14 days with function test every 7 days. Except in the event of a significant operational issues that may affect well integrity or pose safety concerns, an extension to the 14 — day BOP test period should not be requested. Intermediate Interval Maximum anticipated BHP 3772ipsi at the TSGR at 8505' TVDss (8.53 ppg EMW) Maximum surface pressure 2921 psi (.10 psi/ft gas gradient to surface) 25 bbls with 13.1 ppg frac gradient Kick tolerance Assumes 10.0 ppg pore pressure in the Kuparuk + 0.5 ppg kick intensity and 10.2 ppg MW. Planned BOP test pressure Rams test to 3500 psi/250 psi. Annular test to 3500 psi/250 psi 7" Casing 3500 psi surface pressure Integrity Test—8-3/4" hole LOT after drilling 20'-50' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7"casing string. Z-66 PTD Page 7 12/18/2012 Production Interval L Maximum anticipated BHP 3850 psi 9 TD at 8910' TVDss (8.31 ppg EMW) Maximum surface pressure 2959 psi (.10 psi/ft gas gradient to surface) Infinite with >9.4 ppg frac gradient Kick tolerance Assumes an 8.53 ppg max pore pressure in the Sag/Ivishak + 0.5 ppg kick intensity and 8.8 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 3,500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20'-50' of new hole, target 12.5 ppg FIT 4-1/2" Liner Top Packer 3500 psi surface pressure Planned completion fluids 9.4 ppg Brine/6.8 ppg Diesel Variance Request To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line (<1000'). Procedures/Safeguards with paddle removed: • Fluid levels will be monitored in the pits for both gains and losses while drilling. Alarms will be set to indicate if gain or loss of more than 5 bbls has occurred. • The well will be monitored for flow when the pumps are off at each connection. • Over 50 surface holes have been drilled on Z-pad, including the recent Z-34 and Z-69 wells in 2012, providing a high level of confidence in the ability to drill surface hole on the pad without incident. • The planned 8.8- 9.4 ppg fluid will provide over balance to formation fluid. Z-66 PTD Page 8 12/18/2012 Z-66 General Operational Summary Proposed Drilling Rig Operations: 1. MIRU Doyon 25. Aib* l �iti 3 2. NU diserter spool & riser. Function test the diverter. 3. Take on Drillplex Spud Mud in the pits and stand back enough 4' drill pipe in the derrick to TD the surface interval. 4. MU 12-%" drilling assembly with DIR/GR/RES on bent housing motor. Spud and directionally drill surface hole to the base of the permafrost. A gyro will be needed for the first 1,400'. Perform wiper trip at the base of the permafrost. 5. Drill the remainder of the surface hole to the planned surface hole TD in lower SV1, —40' TVD above the UG4. 6. Circulate bottoms up until hole is clean and POH racking back 4" pipe. If pumping out of the hole is required, trip back to TD and make final trip out on elevators. Lay down BHA. 7. Run and cement the 9-%", 40#, BTC-Mod, L-80 casing with torque rings, displacing cement with mud. Bump plug and hold pressure for 5 minutes. A TAM Port collar is optional for poor hole conditions. 8. ND diserter spool and NU and test casing/tubing head. NU the BOPE configured from top to bottom with annular presenter, 2-7/8" x 5-1/2" VBR, blind/shear, mud cross, and 2-7/8" x 5-1/2"VBR. Test rams and annular @ 250-psi low/ 3500-psi high. 9. Pressure test the 9-%" casing to 250 psi low/ 3500 psi high for 5 minutes low/ 30 minutes high once 500 psi compressive strength has been achieved. G -A130^� 10. MU 8-%"drilling BHA with PDC bit, bent housing motor and DIR/GR/RES/NEU/DEN/PWD and RIH to float collar picking up 4" drill pipe as required to TD the intermediate hole. 11. Drill to within 10' of shoe track and displace well to 9.0 ppg LSND drilling fluid. 12. Drill new formation to 20' below 9-%" shoe and perform LOT. Target a minimum 13.1 ppg EMW for 25 bbl kick tolerance. 13. Drill 8-3/4" intermediate interval to section TD in TSGR at —9872 MD. Weight up drilling fluid using spike fluid maintaining the following density ranges: • 3599 ft MD-6492 ft MD:9.0- 9.5 ppg • 6492 ft MD- 9872 ft MD: 10.2 - 10.4 ppg 14. At TSGR, CBU until hole is clean (minimum 2x) and condition mud as necessary to run 7" casing. 15. Pump out to top Kingak, POH while rolling pump at 2 BPM to TKNG. Once at TKNG, POH on elevators only (if backreaming to get out of open hole is necessary, trip back to TD and POH on elevators final trip out). • MAD pass Kuparuk and Schrader formations as required for NEU/DEN data. 16. Change upper VBR casing rams to 7" casing rams and test to 250 psi low/ 3500 psi high. Z-66 PTD Page 9 12/18/2012 17. RU and run 7", 26#, L-80, VAM TOP casing to TD. Cement the 7" casing to —650' ND above the top of Na. 18. Pressure test the 7" casing to 250 psi low/ 3,500 psi high for 5 minutes low/ 30 minutes high when the plug bumps. 19. Immediately following pressure test, confirm that the OA is open by pumping —5 bbls of drilling fluid down to ensure annulus remains open for freeze protection. Continue to pump 1-2 bbls of drilling fluid down the OA every hour until the lead cement reaches 500 psi compressive strength. 20. Install the 7" casing pack-off through the stack and test to 250 psi low/ 5000 psi high for 5 minutes. 21. Change upper 7"cas,ing rams o VBR casing rams and test to 250 psi low/ 3500 psi high. 22. Freeze-protect the 9-%"x 7" annulus with dead crude, once the lead cement has reached 500 psi compressive strength. 23. MU 6-%" drilling BHA with Insert bit, bent housing motor, and DIR/GR/RES/NEU/DEN. RIH to the landing collar and begin drilling out shoe track. 24. Displace the well to 8.8—8.9 ppg Power-Pro SF fluid prior to fully drilling out shoe track. 25. Drill 20' of new formation and perform the planned FIT to 12.5 ppg. 26. Drill 6-1/8" hole though build and turn and continue per directional plan until ROP slows. Circulate bottoms up and POH on elevators for bit trip. 27. Stand back drilling BHA, change out insert bit with PDC bit. RIH with bent housing motor, and DIR/GR/RES/NEU/DEN and continue drilling to TD—13594' MD. Geo steer as required by onsite geologist. 28. Circulate bottom ups and condition the hole as necessary. Backream to the 7" shoe, MAD passing as required. 29. Trip in hole to TD and circulate/ condition the hole as necessary until shakers clean up. POH on elevators. 30. MU and run 4-W 12.6# 13CR Hydril 521 sliding sleeve/ swell packer liner to TD. 31. Displace water based mud with 8.8 ppg Rheliant mineral oil based mud. Drop a ball behind the required OBM volume and displace with additional OBM to land the ball on the ball seat in the toe of the well. 32. When the ball lands, set liner hanger and liner top packer. Prior to pulling the running tool, perform a pressure test on the liner top packer by testing the 7"casing x drill pipe annulus to 250 psi low/ 3500psi high for 5 min low/30 min high. 33. Pull liner running tool above liner top. Displace well to clean 8.8 ppg Brine. 34. POH, LID the liner running tool. 35. R/U and run a 4-W, 12.6#, 13CR, VAMTOP tubing completion with GLMS. Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. 36. Make up tubing hanger per FMC Rep. Land the tubing hanger, and run in lock down screws. - Z-66 PTD Page 10 12/18/2012 37. Displace tubing and IA to 9.4 ppg brine. 38. Reverse circulate filtered 9.4 ppg brine and corrosion inhibitor into the tubing x casing annulus. 39. Drop ball/rod and set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 40. Shear the DCK valve. 41. Install TWO and test from above to 250 psi low/ 3500 psi high for 5 minutes each and from below to 250 psi low/ 3500 psi high for 5 minutes low/ 30 minutes high. 42. Nipple down the BOPE. Nipple up the adaptor flange and double master valves and test to 5,000 psi with diesel. 43. RU DSM lubricator and pressure test. Pull TWC. 44. RU circulating lines. Freeze protect the well to —100' MD below the base of permafrost and allow diesel to U-tube reaching equilibrium. 45. Install a BPV. 46. Secure the well. Rig down and Move Off. Planned Post-Rig Operations: Slickline : 1. Pull BPV, Pull Ball, Rod and RHC Plug with slickline. • 2. Pull shear valve and dummies, install GLVs. 3. Open sliding sleeves as required by NWD PE. Flow back and clean up the well. • 4. Close sleeves as needed to attain desired initial arrangement for production. 5. Install flow lines and well house. Z-66 PTD Page 11 12/18/2012 Z-66 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: A. Surface Hole: No overpressure is expected in the surface hole and hydrates hake been a minimal concern on the pad. No free gas is present on this side of the Highland State Fault. B Intermediate Hole: Expect up to 10.0 ppg overpressure in the Colville starting at —5441 ft TVDss, —6492 ft MD (includes 500' MD safety factor). Mud weight must be increased to a minimum of 10.2 ppg prior to drilling the Colville overpressure. If the drilled path comes in lower than planned crossing the HSF through the Kuparuk there is a higher risk that there will be overpressure due to the Z-102 injector. The Z-102 well will be shut in prior to drilling to minimize this risk. C. Production Hole: The highest anticipated pore pressure in the production hole will be encountered in the Sag River at 8.53 ppg. The interval will be drilled with a minimum of 8.8 ppg drilling fluid to provide adequate trip margin. Higher pore pressures may exist in the Shublik, but this is a non-permeable formation and is considered an unlikely risk for flow. However gas breakout at surface and gas cut mud have been encountered in the Shublik on both Z-69 and Z-34. Neither well required the drilling fluid to be weighted up to kill the well. Any well flow must be shut-in and discussed per RAPID prior to proceeding. II. Lost Circulation/Breathing A. Surface Hole: Lost circulation is considered a minimal risk if mud properties remain in specification. B. Intermediate Hole: Breathing and/or lost circulation is a possibility due to the Highland State Fault crossing. The Z-67 wellbore crossed the HSF in a very similar position without problems. Breathing is also common in the Colville. The wellbore has been designed with a maximum mud weight of 10.4 ppg• for over balance and wellbore stability.10.4 ppg has historically been considered low enough to help prevent losses and breathing, however, ECD must be carefully managed to further reduce the risk. C. Production Hole: There is one minor fault crossing planned in the production hole, however lost circulation risk is considered moderate due to the proximity with the HSF (350 ft standoff). There are also possible unmapped faults/fractures due to drilling under the HSF shadow. Additionally, be prepared for losses/breathing in the Shublik if fractures exist in the area. This has been an occasional problem across Prudhoe. Z-66 has an increased risk for breathing than most Z-pad wells due to its higher MW. Ill. Kick Tolerance/Integrity Testing A. The 9-5/8" surface casing will be cemented to surface. The 7" intermediate casing will be cemented to —1000' MD below the 9-5/8" casing shoe. The 6-1/8" liner will not be cemented as this is a swell packer / sliding sleeve completion. All casing will be pressure tested to 3500 psi. B. With the planned mud weights, the kick tolerance for the intermediate section is 25 bbls with a 13.1 ppg leak-off, and the production section is infinite with a 9.4 ppg leak-off. If planned LOT/FIT values are not achieved, do not drill ahead without risk assessment and proper authorization. All kick tolerances are calculated based on a 0.5 ppg kick intensity over likely pore pressure. Test Point Test Depth Test type 61W(Ib/gal) 9-%"Shoe 20'-50'from the 9-5/8"Shoe LOT 13.1 ppg minimum(25 bbls) 14.3 ppg target(50 bbls) 7"shoe 20'-50'from the 7"shoe FIT 9.4 ppg minimum(infinite) 12.5 ppg target(infinite) Z-66 PTD Page 12 12/18/2012 IV. Hydrogen Sulfide A. Z-Pad is considered an H2S site; refer to the ADW "Hydrogen Sulfide" SOP for the appropriate operational guidelines. The max recorded H2S readings on the pad were 120 ppm in Z-100 March 2010, Z-20 (closest well at surface) recorded 20 ppm in March 2011. V. Faults Formation Where Encounter TVDss Throw Lost Circ Fault MD Intersect Intersect Direction Uncertainty Potential and Magnitude Fault#1 -Highland State Faun (uphole penetration) 7,677.0 6,530.0 SW 400 ft. +/-100 ft. MD Low Fault#2 (Ivishak) 12,500.0 8,840.0 West 10-20 ft. +/-100 ft. MD Low Fault#3 (not penetrated) n/a n/a SW 10-20 ft. +/-100 ft. Low Fault#4(not penetrated) n/a n/a North 10-20 ft. +/-100 ft. Low Fault#5(not penetrated-Highland State Fault south of Ivishak target n/a n/a SW 400 ft. +/-100 ft. Low polygon) VI. Anti-Collision Issues A. The Z-66 planned well path fails major risk anti-collision with Highland State1 exploratory well in the intermediate and production intervals. The Highland State #1 well is P&A'd with a cement plug in the production hole. It has been minor risked at 1:200 to pass anti-collision. In the unlikely event that Z-66 hits the abandoned Highland State#1 wellbore there is no risk to safety or the environment CONSULT THE Z-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. Z-66 PTD Page 13 12/18/2012 M 0 O)^ mm n� O,-ON N n 0 V•-N MM ONM MoN W o O ma Moo Nm,,o M C? MM m OM ON N W O M 0 M m0 MOO V V N-m V hm M c V 0M Oo)eref V f0 Y)C MM toONg 1N-01(]ma M N o5�ci0 NVOCN-ON 0 0N- m CMON M, � npeto0 d W y W OO m 0 0 ...... 0 0 o 0 0 0 0 0 0 0 0,000.. DC 0 W M 0050001 M M M M M C 0)0),)00 W m W m O) O)0mmmmm mmCOmm mmmmm mmmmm mmmmm Mt.m000 mmmmm mmmmm n V m Ns- 16= ,6.- O)^ r-M0.- nm V m 0 n.-CAC 0 0N00m 00C') mn M.-t- C')CCC W N O c 0 Nm 00,-,-0 0N00M0 V OM OmNO0 NM M,LO V N )`)M0,0 N L O 00 ojOm 6NCD)- 000y0- 6666,- 606C.-^ o.1666.-: 6NC")v)N m L+.p00 Cp 00 00nm M 00o0 0nm V M Cl NN N .-0000 N- O V NN O 0000 00000 p00 00000 000)00 0W00 pcocopp0000 00000 00000 mmmmm 00000 00000 00000 Z 'Um m1)mm mmmmm U) )m mm mmmmm mmmmm a- ) o0 00000 00000 00000 NpNU� NUNNU ) NUUCUUmm mmmmm mm ) ; UU q K 0000 V V N 0M M V n00 U)O V n 0 ' 0 N m C O n-M m V V N M c 90 O O o 0 m m O M n 0 N N N N M m n N-0 0 ,-,,-,-N N M 1+)V V m n N-,),) O �C 00000 ,-NNN0 616666 66664 C'U'U'U Cer'Vat sr.*ate''U le C y ,,000OOONNg 0 OOp ON NmmNN S88,92 S2,9,98 OOOOO p NNN66 66006 66666 66660i 66666 00000 L CD MI EE y -- .0.0- O--- Fa w==2;; V momm ==8MN m' rn== ____ 00 NNNNN NNN 0 6 6 OVOmM : m V M C m V V V M M N N NNN N N N :15_ ? ' , t L J 2 J CO N Oco m 2iW y 8 >28 > C co z 0 0 O^p0)r) Oml M N n m V n V m m M M n m e M M C p .m.-MN M O m O m Cl. _ 0 0n m O nO?. COm mmn MCO0 N Nepp}N'N o)N o)N N • • U~O n 22 E C N.- W 0 0 0 0 7 tV Chi Y e�K.71(0 COON 0 V fil N- 0 O p O M C(j cnO Ctj o)N h CO E° O .o N n N-c e o C 7 N NO,„.-N M Y V 4 11' n O).�V V N E O 0 C0 m N M N N W U 0 N 0.- CD :- N° 006001,-02,1, .- D0(oXm N N 0 R' m N.- m N-,m) 0 N> C W^ 00 mN M 00 V m 0 Om NMN mm OMM OmOM y 0m00, mm.m N Z.- 00N0 N NMN-00 00 UON- mm N N met V 000 �m NO V M.I.-pN u. O O 0000 tC CP.-N V W C?66661-: m o0C ,-N O N(CO CCONNNN 000002 NN NN N //W� = Z ' 0 `� O O �)�1 - 21- .2 = 1- N t C .- C i 0 -61-10 CD U 141.0 ',7,C f d )' luf (D rzi W ° OO CU EO. mW 'oum Nd> O ✓ C E , yONCC _x u ¢ j. _ u W OO NN O 0 ou O- mm Nn 0 0,00N nOMN M NOvrNn. nNF aOOmN NMnN OhM0 MVNVO NNN 0mOC G WCCOUy_ 0.0U ` OfOCn 00006 0 66D.6 N6n6N C ' N6 MpMro OC()e0 W J 22 ❑ 0❑ G > NVm mmmO VNOVMNotMMOoOVMnWm^M d MM ?VV wnmP V / NNN Um ! U � UC8p S muuKKaP2cLVUm N to m tEE.. 1 .� rn� arp« A d m d A o , m a 0 0 0 fA a y » FN � FF 'LO '22f7FJ O. O ❑.- 00,MM m V COON O 00,-(M')N O�NMCND 6.,-MN,- N��OCpp N-) mmmmm = �.... 0000 mm O)O)6N 66 N7 om0 0,0-(0167 Oma -MCN-, �00N. 00006600 C[6 N(N-0 0 Q O C O 0 0 66666 0 L O 666m- mmnN-0 00 -,-�..tr �^�,-' ,-qN-Op ... NN NM M0 m O > t 00 m Cm p V,- n0MN m O npm V Mm Vnm n ,-0000 V 0 0 0 0 n 0m 0 o ooooo m Nomm OVmom 2d TOmh0mOWNV00N0WD'UVV0OmM00NOhMON ) ^L O Oo 000 ) ppNO t0O , O , ,-NNM Vmmnm 00000 NMV mmm nn,mm NVn00 00 m ..... ..... , NNNM M (0 C= 4D.. 0O0,- n N CQ' ,= M pp.. 0 0 0 5 0 0 0 0 0 MN mm V V Myy O 0 nO N , N01= ONS ` . ND0V ,-a.- 0M N •-,,,,., �np��� ?: 2t_-0 0 0 0 0 66666 N-^n n N 66,-66 O) 6 16.- N y)m m Cp (p CO CC)Cp CC) \JV 0 F' 00000 0000•- N NN NM V V mm m OCXjmm(O M.000 0(Om COm C (p�p� m • CO EE NNNNN NNNNN NNNNN 00000 NNNNN NNNNN NNNNN N VV V.M.V ON-) OC,-6 ¢ NN o ,.O 6a3W� . m=OQ.0U1Q ON `O- e 2 V^ OON-OO OOOOm ,-mmmN M,-nmN mmmmn OMn MM MMMMMNC0n NMc .. 00,00 OOOnm 00o016 mMN ?m NNNOM NoMmm mmmmm 0TmU OmNYOO OOO,-N 400,-N VVVVm 6,-4n0 mN, 60p666 66666 NNNM , o, MMMMM MMMMM WmqXX ` Nm 7x N- NM E 20NN �ELE . NV0 ;w m¢ c c N m > ❑N 0 ro rn Z m O NO.0 N N Z N Z Z Z r--0/0 0= 00w00 00000 00.00 00000 0,,00., Oat00n ON-O)V N- m 00400 00000 00,00 00000 E O OO eOCO0p 66666 mmm 001000 00000 0NNN0 00000 6N6o0 06060 6 ).:66 ' Om00 00000 00'00 00000 Ni0n0 OC6OMn pmV00 d MMVm mnm00 r-04 MVmmn nNNMm 0 OOp mONmO NNN N N M M M O w O) p O K co y O O u * u N c w c T> m _ E c w ° (o .. all 2 >r. N • m U L 0 W E .di7UO U ao ti. UE° � m ✓• . o t ooD 7m G m 000N-p o m _ - oa > o00oere , Uim , ¢ mNHUJJUU wE oi E W 0 c - v 0 xmcCm 00 hn o MM 132 00 2 n• M cm• U 0 L=1n VMUm 02U 0 L8 U Uc.0V •C Ill U.1 V iMN.� Om » 0) WO 0)co co a 0 M 0 N a 8e NNNOa gqorV a)p N.al0 an%NMN OM oo0NN 0 %c0 400 O N O0NN N-NCMN 0Nu4 W V(00106 0000 000oN M NN 0N-V00 % WV0MUO DTMO MNs- OO00, ol o0. OS UONi 0 N 060 mnOaNV ) O W 0000 00V%Y VM7C)N CNM0NN,, ;.: ;7.O0 NNN ^O ootOav -_,- Oa)^COO 4 OMOOit .0 m 0mAo0orrrr ^ 00Wb0OOO1m 0commmmOOaWOaaa0T 0)p0 O0oOi ) 0o000 0000 < ohha, o ahah, )hh<oa) hohaU h N o00 ha,aoh to N N aN a,h UI C) 0 a0LOaoah nnnnC) hao hh l0 r V OO _N 0g TN NCOO 0a00MM NOM00 010 0r ^ 0 GDT 0p CrrO,0 000µl0 0µ0 0 0 .0(ONq 0N10^(0 MNMrN O C= (O0 N0 0(O NCS ONN,N O(O aOON M N010 TM(ON COLO'-.MV V 00 0 CO a0 00% TTN 0 001,100 N LL"C 000N00 0 V 0µQ V 0MMN NNNNN Co U) 000 00000)6 100 -p0 0))00 0 pN CmOOCCOaanrN. -1Nn0000 Q ,NNN In O 000000 00 00000 66666 0000�00D C0 0 (000 00 00000 00020 020 0 a) 00(000 OD.".1.3L0 s a)a)0 a a)y 0O ` Z 00000000 000000 0000000 00 a)Of 0 0 001 000 0 0000 0q p0p� 0 0 0 00 aA 0 0 o 0 010000 0 p�q 00 00 000 000010 1010000 00101010 U)a101oa0 U) 0 000 U)U)lo 10U') a a 010ao Loom la 0 U)aoaU)a if a)a,a0U) ao Ull01oa0 )a % a)NN 00000 0(000 00000 N NNMMM 1000 N MCU) CO CO O NNN ..4.000N-N. Nrr0U C d 0 0 0 '-,-'-NO4 N N N N N N N N M M 0 M COMM NMMNN M M 0 T V. p T T T V 00000 a 110 10 1 G)l 0 1 0 0 10 10 CO 6 oUjhn° Inaaaa, u),a0, al)hhu,a, U) <o a a, hhhhh UIUOa)a6 aohh h a6 NNhha U)U)U)aa)h U)aoa)uja6 .4 .. 80 ❑ J V 8 8 p o N 82828 p Q p S a) aO O N O o O 888 OOOpO 88822 S O O O O 0 0 0 0 0 88888 pppp8 ❑ o CODON NNNNN NNNNN NNNN NO N 66N NN C C 0 0 0 0 0 Oo N N NOO O O N N 0 0 0 00066 C O C Co U n corn /J JJ J JJ JJ JJlp JJ-J JJ,IJU) (O J (00)0 (0(0)04)4) co-r.: J (O(OO 0 J J(0(0(0(0 (n6)OO)4) O)f/)(O V)J � -- 222_s- NN OU) a� Tim ao0No2 2 C)) =22 22222 2mmu,8 =22 2 VI N=222 22222 2=220 600(0 (oM NO? 10 NaVOO 0666'0 0000 (() r a70a7 6 N A r� r'1-rr 0(000 (0(000 i- 030(.0 r N (p W T(O U)0N 000 aar mwmm, Co OM0)r C V 0,-1, No100 U) T 001-0 010e- o N r Oro T NT NOT NN0 V 0 N d CNOMV 0NO0 01 NM0 oo00 - 0 0 OOON0000TNaOO N0M o. OtnoaO000C000O'JW O pa1CMCOMV0 W. vON.,-,I0 ?rR ( 000000ON1NmN0VOr0NNMMMCV0j [ CO00000 WO)'-'- NV ) ) N NNNNN N NNNNN NNNN NNNN N NNNNN NNNNN Na?Ma? ?MM ti ?MMaTTCNO (D N c W 0 0O V M^0'O aD0N0r agNr V O o 0'GO a0 TN0^ *0)000 V O.N Is 0 aV Tt� f0T1� 0)ON N a0 Z (O aD OOM r V O 03 00(,0 0O a0. 0 o 0.,-(, 0300 C 0?faQ QO 10a�ff (�N00Q GD ;fyQ�drDC M O1GD Oa0 U] OION M O �dp 00000 4c60,:4 NN N 00Uj ra)06 a7 00 TO 0(70)17K cimp$ YOIO CO 6 `7 W G0Da0)n a`0)OM)aO4OWN. 0O rW N > NN ta0')Oj' 'a7MMM MCMI]T M 9 799.. N (0? 10+11 MOO9 999 ar79 v y 7? y1-9 U? (03(00. 000)0CC 9,- ,9.0 O0 1 . ' ' U w (6 N c W ai- 0,,,,,t.- V v0)OU 01,0000 Oaa?0p0f N C0) V IO a0D tO W 0 to N C ,-aIN0.0 0(OD.NN)GN W00,- 00 a 5. N O)O)aa,N- 000x0000 .-N0µ10 - > (030(0)UDO N(j(00N00 041000 aaa o o o' N 0 lq 100 NO 00�N U))^ 00((,(000.- NON 0 !0 a)'NC 0 a0)00)^00 04000 N < Na)0 0 C-N NN aO 0000030 (00000 0 0 000 00000 M CNM0 000 0 0 0000 N MTµ % 000 N N N N NNNNN NNNNN NNNNN 00000 NNNNN 0 0 0,7 vsv v aV•)4 O.N-0D .-n.-N.- .-.-vsn 0 v. v- '1 vIs .-.Cad. .-00.—U) (0 vs 0r v CONC0 a0 vvs,-0i 0i06ary.....0 0,-v vpN M 0000 V O gi 0600^ ^O^n 000 aD00V 0 (0000 00650 ap60 06666 7060 0i066 n 0 a0`( MRN 00O V 0i 006<66 22,12w E CNj to of 00 C0 V O0v 0 V 0,t10 et .%2Z-.A$0 v o vvm. vv a)1n v) 1aµ)a)00(o 0aO0 Co n N r r a-r N0000 00000 m 0 a) 0 L W 888°-!;-, 8p 0 0 0 8p 0 0 0 M O O O O O a o O O 8 O 0 0 0 0 0 8248P! M a 0 O N 0 0 0 O (1 0 0 0 0 0 0 0 0 a o 0 0 0 C 0 000.N 000 or 8080 O 0 0 040 0 o 00 h- {Opp O 0 0 0 0 0 0 o 0• 0 a; ?0 0 O N (vo,(0,0 0 0 0 0 0 0 0 o 0 000 0060 n 0 .0 0 h: a M CT)a•°°)c0 "4.7-vva c4!4'4-04- 4'%0'444 V 4 `P 00 1,0000 000ary O a,0ha 006 CO r m- - N00 N NN)(NN0 N0000 000000 !C Y)a0 a0a0 v.--N.... 0 a-0 T 0 •-OCAp 0 00 U^' '^"' oomo a0 COaOao 0 Q r 0000 00000 08000 NNNN N O(.N N M(� T ,-0(O f+l O O O p ,--r-.3)0 N00 N NJ (0 0.000 00000 O p o w 666(066 a6,06O(6o (CO(MOtp(NO(NO 0,00(0360 (0 w 600(0(0 (wz Sao 0 aOcw 0a ovv a 0 00(0.)001 ciclo NO a0`1GMD COi O a+0) yE NNNNN NNNNN NNNNN NNNNN N N N N N NNNNN NNNNN NNNNN N N N N N NNNNN NNNNN Q m e 22224 2224 0'40 0 22^82 H,Op X12"-8X12"-88 0 0 O O 222 2a 00000 22228 2CC0.N 022 O N m0 $o$ 22222 2222 08028 Oj0O)00 h U)NMN M0oiNN, 65 N V T V NC. 0 <6 0i a7 NN a7 NN :Ti V N V Ti Ti n NNNMMMMo y ` a7NNNN NNCVN N N NNN NNNNN NNNNN NNN N NNNNN NNNNNNN OF 000)N00 SvSN.0 0SMO V ONO)O M 0 M r)N 00,-NM0a:N0N0 v-ONN s- 0 00 N-Na0,ri 0N.0000 0.0,O co V 0008 U)10010a0 0(010�<0 U)U)U)1010 n 8 0 a U) a)s a a CO (0001.0 N-N.r r 0 "-00 a0 O)00p,0,01 a) 000 O)0 1sys(000 N NM % TTT 10 CO CON- 0.000 M 000 000 r M Tao a0. CO C.r 000000 (.)µµV V O O N (O U N O a) M S o w o m (� 0 1- o EIT;-1 $ O m l0 2 ¢o Z m sz an z t c 5 2 C an E ¢ N (.) 00U m N U 0y W 1 c-j 00 0~ y � co E CM N v �Q v (Da 01 m0 N (0 CJ y 62OLL W0007¢ �f6U2 __ V »jct7 2 222 W ONCUWOO 00000 UU N w�2�)°-U WI--1�-1'- ��ti�� F�-N FA-U M 0 M C NTmNv0mn )W) MOM, 0 •-10.- m610000o wDaI) m7mN u00 106 m667 ( 0 Cloo -m4 (0 b0^ ? 8.- 0pW 'NNNOV806M806W W co 0 a C 080a No,OO((0 8yq)r 0Y 040 WO00 8' m W .0 � ! pWNM8OLLt8881010Q060006UU10 U ( Ww 0M 14666 6) 61 60141414 0614 000000 2 6hto10 m6Om06141414WW 106 WWWWW WWWWW OWWWWW 0 Q 614) e01010Iu )14WW1010106 00000 00000 60000 0 r. V 6 p 8pp N 0- el') e80ON)o V m 10 oM)^N;,_ a0ar10 r0)0N .vm6o, 04 W 660 8(0))1(00000)) 1001880664 .800. O N C C 00 of -,W 0)0)00)W 0 060600616. ne^O)I W 86+)MMNg c';88,73 N 82101200 280060m)MO) 6 10 2 (0 1]1014) 101014^)1014^) 41111)108 I[10110 10810111) NI(WWW 8641606 1810 NO10II 0 6140)03146)6 "Lo.,,.,„1 610116)1010 10101010 110 10160 10 4 00000 8 10101010 10 8 10101010 10 MN10m0 ON?Om WON O 80.-10 W NNP)' 8010.-8010 0008 V 6 .0.- MM 0 6mmm 80 N.r.r.e.1. n6mW W 000.0 0.-,-� .- NNN NMMMM 170000. a O C 111 u)u)u)O 03(010 I) .i611 0 u) )O 066 680806 b 6806680 80808066 80680101080 80 U Of r BE ❑ CO 66660p6p6 000000106 p p p 0 00000000 00 0001V 6666 66140060ooo 0 O Do N'^^0) ^,cmN^ NN" "NN (1DON0660 00000 0000 V V Ool ' LL e _1,,,,I J J JJJ JJ JJJ _1_1_1_1 8J(Od'Q'z (OJJJJ JJJ J6 Bo JJJJ(/) 000 ~ 108`^')tm70mi 060, 10)) O00 0011084))0 o 0O00)).0), N=mmum) =-8,.86'0,- 06.8..- =V. ,-•-(0m e- 000 014)40 44408'1 0)M 0)MN NNNM 6 O)Oj^ N.-.- 0066 6444 ' Odd m 0000 6 t•n N0 6 0 0 6 10 6 6666 x 0 m m 6101010 80 l7 Q p p m C N^^N-n WO V 010 ^.80068 O M,-0) .OND10�g 860,114 106 000 W'5))8 a 0)800 W V d 60;Pje•0 104r�6O 4804.-W 0011)1 00)01)6o M 0 NO 004806 01.8660 m 6 6 10 e`M M 10N-000 0 m V 0 610 6 8 6 6 610 0 0 6 6.- 8p 0 W M 6 N M N.-00 8 O 6 NNM00 MMMWV V V 6 WWTT TTTNN 8`r W6 0 M 01666,8 ggqvq ggql7q v'TyTq ITII gYYY? 44171 vv$vv 1?'?'?'71?'? ?) Co N C 10 to p m6.-66 0)1Om0')N mMo0NN 0MI.O OO W m 60 W Or. 0 MM00 ',Wt.-WOW 0 000 2 .}e-M 668800) 100.8 BNyN NN ID W 0r.MNO 806866 1010 W 668 ' 001mO1100 V 1 100p .-NO 00000 00,-0, w-6T NN NM N m ONN-N. 0NNNN N NNNN N t08o(0000,jcn87 M m�8� U 666 co 2101010 80 N C Lo o M N N O W 00.-T.-r.- 0 p W v 6 WW.-0 6 n O 0 e. 0 6 O N 6 M M 6 6 0 6 8 0 0 0 N d W K WNOOT mf,..-ON 6mm4m Mo OO �-r 887 m 6660.- V r 8761 m N W rro r CO ri 800;8 N0080o NM6 W 0 N0j 46 4.-6 00 N or 6.- 0.- 8N- P) Q "100380 3300080 NNNO0 00.-N Mc�IM. 11006 TOMO,- omggrr r M M M87M 870)M MM oto MM M000 0 V V V.} 0000 00000 v 00000 V d I Q 0 Qv tp C 7.6-.6-T6 ..t7.6-0.- 6m666 6644 N000 0 V Mt7... 00)100r: 66666 .010 -'.600 N 1.66ON .- .. a�a� oi 14 N N W M V MC NN-Nm0 0,0,06006 0,00,00 0A 0 00006 00000 00000 x00000 • 0 0030,00 0,0303003 0,0000 0000 003000, 00000 00000 m 6 6 6 6 m 0 W CD O 0 L v (A- 00000 00000 0).8�N O-68060 0.0 00 0).00 100..nvinNd ‘-6604601 00001-0 00))' 0000. 0 a ❑ 800)16.00 00)86 880 6 000 ).6 Nmm 00000 m 0800000 cDm a0080OMO106 m 610 m m 0000 00 mm O) > 8,0 m n n N.N.N.N-N MW m ~ 0030,100 0,0,0,0 m m 6 m W 1 00300 0001003 0030003 00000 6 6 6 6 6 6 6 2 M W _ 6 Nm Wpm y OV8M0 m�06 � 10W0 0 (58W1M08 .006 mNVN. O?NO ? 7..Iw 0 I- 8�600 ) 0) 0040 ' s-OWr660O 06086pmNNNs-.---w 7 ))1 ) 800)0 4 )) N 0 0 0VV NNNN N '. E NN,,,,,,,,, NNN0`)N NNNNN NNN.- I- W W •y W N H LLJ 0 r W N M m 0)m 1. 0311)..0)* 0.-8 6 0 0 0 0 1. 1008000 000)0)0) r.-o r M 0)0)01000) M 6w-1 �:..- p0I001N 1`me•Ne• N0m00 0�1`' 66666 Mp nn660 87MN.-0 OWp 666n- NN p0W0N Cl r W MM0)08.0 V64106 10 68.000) W W W0)i W W 606000) 6668,-6 6 6 moW WW 6660/00/0 W NO,- Vr 8O 0 J 0 IL 8O 0 M V W W 0 NNW p C 0 M 8 O 2 C omrrOo 0..0)otmy 6000;OW 08088 o0mom 01000 oo00N-- 0w00CIW0WP WKWPM 664,0V 6666 6466,i .-66O6 66666 ,000 6 666 N -0 W= 00000 00000 00066 00 00 00000 00000 804 V 600 00000 000 W W 6W 0)0)0)0)0)0) 06) Q tt/n)�m 6 0 6 N C m t 80 17. r0 0 M o V 6 Q 0 d ? 6 2110 a t' 6 2 g� Z m E 0 (0 N 0 I- 0a i- 0 a I-Qp 0 1p C 0 1--IF-v vaa 1 1 (1) 0 W 0 N 800 N W U ON W P 0 00 a 00 o co sr o , , j ) K k ' \ § g il 3 | o � ! = ). -! § _ CD „ • ate !! MS \ § = ,! �� , 4 11)11;ii- § CA N. }( L' c‘i( �. . § ) ° ,. ° ) _ � 22 « }j§ a 6 2 g" ! } _ 0 e sr P"' . ! > % E k )§; ® A 2 ° D !§• » ' I. / )|| , ( 03 e/. \ : \ o - � \ _ ] } ,\ \ : § 4 M F,r ' ` a ~ ' O. )z\ ; 5IA I § \ §4! o ( ! - � 5 ; ..-4...n.,7,... 88 £ �1 --1•£ wo • 3 ; f ., 2 VN - § !,� ` C, § iye / \.....IT C 7 ' ° . ° §\ $ ���� § 9 CO a1 ai';3 $ §® , a lCD t, = N § CD 20 ! , § . in i |. • o C CD sr ) «< N U00E4=mnS S >>> . —a _ -._---4-- - LO—N � asi- -- 0 O I LI—=I 4 �o i r - In • , s \ 1 I o I rn \ Ii c In - - 0 in - 0 - —0 a I - a� O a I °' I D CI - a) 2 CNl'---' c r 1 i / I Lel � In —o 0 it J m N c —o a N L a) 03. CD 0 00 >Nt ::,-ONCCC u-i — L7mC DN N U a)— 4) C c a W 1 1 1 1 1 1 1 1 1 1 i 1 1 l 1111111111111711M . 1 l ! „ I 1177TIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0 In 0 In 0 In 0 In o In 0 In 0 In 0 In 0 N- h- CO CO In In V C) C) N N (u VII 00 uogeiedag ailuaj o;allue BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan Iv'Z-66(SC)v6 Project: Prudhoe Bay TVD Reference: Z-66 plan P273 @ 103.15ft(Parker 273) Reference Site: PB Z Pad MD Reference: Z-66 plan P273 @ 103.15ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: Plan lvi Z-66(SC)v6 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-66 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#18 Z-66 v6 Offset TVD Reference: Offset Datum Reference Plan#18 Z-66 v6 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 5.00ft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,554.69ft Error Surface: Elliptical Conic , Survey Tool Program Date 11/15/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 46.95 1,200.00 Plan#18 Z-66 v6(Plan Z-66) GYD-GC-SS Gyrodata gyro single shots 1,200.00 2,700.00 Plan#18 Z-66 v6(Plan Z-66) MWD MWD-Standard 1,200.00 3,599.00 Plan#18 Z-66 v6(Plan Z-66) MWD+IFR+MS MWD+IFR+Multi Station 3,599.00 5,100.00 Plan#18 Z-66 v6(Plan Z-66) MWD MWD-Standard 3,599.00 9,872.00 Plan#18 Z-66 v6(Plan Z-66) MWD+IFR+MS MWD+ IFR+Multi Station 9,872.00 11,370.00 Plan#18 Z-66 v6(Plan Z-66) MWD MWD-Standard 9,872.00 13,593.89 Plan#18 Z-66 v6(Plan Z-66) MWD+IFR+MS MWD+IFR+Multi Station 11/15/2012 9:32:33AM Page 2 of 5 COMPASS 2003.16 Build 73 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan Ivi Z-66(SC)v6 Project: Prudhoe Bay ND Reference: Z-66 plan P273 @ 103.15ft(Parker 273) Reference Site: PB Z Pad MD Reference: Z-66 plan P273 @ 103.15ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: Plan Ivi Z-66(SC)v6 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-66 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#18 Z-66 v6 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) EX HIGHLANDST HIGHLANDST-HIGHLANDST-HIGHLANDST 12,467.22 9,140.00 1,063.18 13,367.60 -11,987.93 FAIL-Major Risk PB Z Pad Plan Ivi Z-51 (NA)v6-Plan Ivi Z-Z51-Plan#2 Z-t 320.16 300.00 143.55 5.21 138.34 Pass-Major Risk Plan Ivi Z-55(SB)v6-Plan Z-55-Plan#4 Z-55 vE 584.82 570.00 15.39 10.56 4.84 Pass-Major Risk Plan Ivi Z-57(ND)v6-Plan Z-57-Plan#4 Z-57 vt 408.01 390.00 142.58 7.39 135.18 Pass-Major Risk Plan Ivi Z-61 (NF)v6-Plan Z-61 -Plan#12d Z-61 359.84 355.00 155.45 6.68 148.77 Pass-Major Risk Plan Ivi Z-62(NC)v6-Plan Z-62-Plan#2 Z-62 vt 510.55 495.00 125.79 8.35 117.56 Pass-Major Risk Plan Ivi Z-71 (SL)v6-Plan Z-71 -Plan#5 Z-71 515.36 505.00 165.82 9.42 156.39 Pass-Major Risk Plan Kup Z-114(27+45)v6-Plan Z-114-Plan#1 2,597.44 2,370.00 307.55 70.50 239.41 Pass-Major Risk Plan Sch Z-202(NB)v6-Plan Z-202-Plan#2 Z4 295.65 275.00 140.80 5.33 135.47 Pass-Major Risk Plan Sch Z-211 (SJ)v6-Plan Z-211-Plan#5 Z-2 528.53 510.00 135.66 9.63 126.04 Pass-Major Risk Plan Sch Z-213(NL)v6-Plan Z-213-Plan#3 Z-2 358.71 340.00 221.83 6.47 215.37 Pass-Major Risk Plan Sch Z-214(SK)v6-Plan Z-214-Plan#2 Z-'; 389.86 370.00 149.78 7.05 142.73 Pass-Major Risk Plan Sch Z-215(SH)v6-Plan Z-215-Plan#2 Z-'; 395.14 375.00 89.78 7.14 82.64 Pass-Major Risk Plan Sch Z-216(NI)v6-Plan Z-216-Plan#2 Z-2 354.01 335.00 189.05 6.38 182.67 Pass-Major Risk Plan Sch Z-218(NE)v6-Plan Z-218-Plan#2 Z 402.96 385.00 150.04 7.30 142.75 Pass-Major Risk Z-01-Z-01 -Z-01 2,354.54 2,165.00 207.59 57.74 151.59 Pass-Major Risk Z-01-Z-01A-Z-01A 2,354.54 2,165.00 207.59 57.90 151.44 Pass-Major Risk Z-01-Z-01 APB1 -Z-01 APB1 2,354.54 2,165.00 207.59 57.90 151.44 Pass-Major Risk Z-01-Z-01APB2-Z-01APB2 13,592.74 12,010.00 305.10 181.63 128.83 Pass-Major Risk Z-01-Z-01 B-Z-01 B 2,354.54 2,165.00 207.59 57.74 151.59 Pass-Major Risk Z-02-Plan Z-02B-Plan#3 2,400.98 2,190.00 214.52 62.08 154.23 Pass-Major Risk Z-02-Z-02-Z-02 2,401.71 2,200.00 214.55 61.96 154.38 Pass-Major Risk Z-02-Z-02A-Z-02A 2,403.65 2,195.00 214.62 62.06 154.39 Pass-Major Risk Z-02-Z-02BXX-Z-02BXX 2,401.71 2,200.00 214.55 62.12 154.23 Pass-Major Risk Z-03-Z-03-Z-03 2,467.22 2,250.00 138.90 62.35 78.83 Pass-Major Risk Z-03-Z-03A-Z-03A 2,467.22 2,250.00 138.90 62.35 78.83 Pass-Major Risk Z-04-Z-04-Z-04 2,520.88 2,295.00 219.23 63.57 157.73 Pass-Major Risk Z-04-Z-04A-Z-04A 2,520.13 2,285.00 219.21 63.53 157.73 Pass-Major Risk Z-05-Plan#3 Z-05APB1 -Plan#3 2,562.42 2,325.00 221.37 67.21 156.31 Pass-Major Risk Z-05-Plan#4 Z-05A-Plan#4 2,562.42 2,325.00 221.37 67.21 156.31 Pass-Major Risk Z-05-Z-05-Z-05 2,562.42 2,325.00 221.37 67.21 156.31 Pass-Major Risk Z-06-Z-06-Z-06 2,628.50 2,375.00 228.75 68.31 162.71 Pass-Major Risk Z-06-Z-06A-Z-06A 2,627.15 2,370.00 228.71 68.25 162.72 Pass-Major Risk Z-07-Z-07-Z-07 2,697.91 2,320.00 367.21 81.67 293.69 Pass-Major Risk Z-07-Z-07A-Z-07A 2,700.95 2,320.00 367.16 81.60 293.61 Pass-Major Risk Z-07-Z-07B-Plan 7 2,700.95 2,320.00 367.16 81.60 293.61 Pass-Major Risk Z-08-Z-08-Z-08 2,700.08 2,405.00 214.47 76.32 140.55 Pass-Major Risk Z-08-Z-08A-Z-08A 2,702.46 2,405.00 214.16 75.81 140.66 Pass-Major Risk Z-09-Z-09-Z-09 2,869.21 2,565.00 213.31 54.17 159.36 Pass-Major Risk Z-09-Z-09A-Z-09A 2,868.04 2,555.00 213.28 54.12 159.37 Pass-Major Risk Z-102-Z-102Z-102-Z-102-Z-102 7,364.55 8,725.00 717.45 365.57 390.10 Pass-Major Risk Z-103-Z-103-Z-103 2,111.55 2,035.00 163.79 47.53 117.69 Pass-Major Risk Z-103-Z-103PB1 -Z-103PB1 2,111.55 2,035.00 163.79 47.53 117.69 Pass-Major Risk Z-103-Z-103PB2-Z-103PB2 2,111.55 2,035.00 163.79 47.53 117.69 Pass-Major Risk Z-108-Plan Z-108A v5-Plan#2 Z-108A 2,349.99 2,105.00 422.35 58.34 370.31 Pass-Major Risk Z-108-Plan Z-108APB1 v5-Plan#2 Z-108APB1 2,349.99 2,105.00 422.35 58.26 370.21 Pass-Major Risk Z-108-Z-108Z-108-Z-108-Z-108 2,349.99 2,105.00 422.35 58.35 370.32 Pass-Major Risk Z-11-Z-11-Z-11 1,928.23 1,835.00 182.52 39.99 143.45 Pass-Major Risk Z-11-Z-11A-Z-11A 1,928.23 1,835.00 182.52 39.99 143.45 Pass-Major Risk Z-112-Z-112Z-112-Z-112-Z-112 2,351.08 2,150.00 278.39 60.62 221.67 Pass-Major Risk Z-112-Z-112PB1 -Z-112PB1 2,351.08 2,150.00 278.39 60.62 221.67 Pass-Major Risk 11/15/2012 9:32:33AM Page 3 of 5 COMPASS 2003.16 Build 73 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan lvi Z-66(SC)v6 Project: Prudhoe Bay TVD Reference: Z-66 plan P273 @ 103.15ft(Parker 273) Reference Site: PB Z Pad MD Reference: Z-66 plan P273 @ 103.15ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: Plan lvi Z-66(SC)v6 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-66 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#18 Z-66 v6 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB Z Pad Z-112-Z-112PB2-Z-112PB2 2,351.08 2,150.00 278.39 60.62 221.67 Pass-Major Risk Z-113-Z-113-Z-113 414.50 405.00 170.39 6.83 163.56 Pass-Major Risk Z-113-Z-113PB1 -Z-113PB1 414.50 405.00 170.39 6.99 163.41 Pass-Major Risk Z-115-Z-115-Z-115 337.13 325.00 162.55 5.51 157.06 Pass-Major Risk Z-12-Z-12-Z-12 1,863.53 1,780.00 188.92 38.43 151.24 Pass-Major Risk Z-13-Z-13-Z-13 1,793.43 1,720.00 178.79 33.87 145.52 Pass-Major Risk Z-13-Z-13A-Z-13A 1,796.97 1,715.00 178.87 33.98 145.52 Pass-Major Risk Z-13-Z-13APB1 -Z-13APB1 1,796.97 1,715.00 178.87 33.98 145.52 Pass-Major Risk Z-14-Z-14-Z-14 1,726.46 1,665.00 164.08 33.87 130.75 Pass-Major Risk Z-14-Z-14A-Z-14A 1,726.46 1,665.00 164.08 33.87 130.75 Pass-Major Risk Z-14-Z-14B-Z-14B 1,726.02 1,655.00 164.07 33.85 130.75 Pass-Major Risk Z-15-Z-15-Z-15 1,547.51 1,500.00 175.87 27.69 148.39 Pass-Major Risk Z-16-Z-16-Z-16 1,464.21 1,435.00 58.27 33.75 25.44 Pass-Major Risk Z-16-Z-16A-Z-16A 1,464.21 1,435.00 58.27 33.75 25.44 Pass-Major Risk Z-17-Z-17-Z-17 1,479.00 1,445.00 136.28 25.49 110.99 Pass-Major Risk Z-18-Z-18-Z-18 1,317.81 1,310.00 38.94 27.76 11.53 Pass-Major Risk Z-19-Z-19-Z-19 724.95 710.00 103.29 17.26 86.04 Pass-Major Risk Z-19-Z-19A-Z-19A 724.32 705.00 103.27 17.24 86.04 Pass-Major Risk Z-20-Z-20-Z-20 822.20 810.00 70.10 14.21 55.88 Pass-Major Risk Z-33-Z-33A-Z-33A 13,375.30 11,440.00 179.04 153.36 48.76 Pass-Major Risk Z-34-Z-34-Z-34 587.13 585.00 257.31 9.63 247.68 Pass-Major Risk Z-35-Z-35-Z-35 2,931.63 2,575.00 262.09 54.52 207.57 Pass-Major Risk Z-35-Z-35PB1-Z-35PB1 2,931.63 2,575.00 262.09 54.52 207.57 Pass-Major Risk Z-38-Z-38-Z-38 3,359.27 2,915.00 321.73 69.26 252.62 Pass-Major Risk Z-38-Z-38PB1-Z-38PB1 3,359.27 2,915.00 321.73 69.26 252.62 Pass-Major Risk Z-39-Z-39-Z-39 2,034.38 1,920.00 93.97 42.13 53.67 Pass-Major Risk Z-39-Z-39A-Z-39A 2,034.38 1,920.00 93.97 42.13 53.67 Pass-Major Risk Z-40-Z-40-Z-40 621.05 610.00 117.35 10.83 106.53 Pass-Major Risk Z-46-Z-46-Z-46 773.30 750.00 115.25 13.47 101.91 Pass-Major Risk Z-46-Z-46A-Z-46A 773.30 750.00 115.25 13.47 101.91 Pass-Major Risk Z-50-Z-50-Z-50 777.53 765.00 38.60 12.76 25.87 Pass-Major Risk Z-65-Z-65-Z-65 617.10 605.00 40.10 9.47 30.71 Pass-Major Risk Z-65-Z-65PB1-Z-65PB1 617.10 605.00 40.10 9.47 30.71 Pass-Major Risk Z-67-Z-67-Z-67 3,535.71 3,085.00 318.58 76.02 258.95 Pass-Major Risk Z-69-Z-69-Plan#14 Z-69 417.57 415.00 200.14 7.61 192.53 Pass-Major Risk Z-69-Z-69-Z-69 413.49 410.00 199.61 6.56 193.04 Pass-Major Risk 11/15/2012 9:32:33AM Page 4 of 5 COMPASS 2003.16 Build 73 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan Ivi Z-66(SC)v6 Project: Prudhoe Bay TVD Reference: Z-66 plan P273 @ 103.15ft(Parker 273) Reference Site: PB Z Pad MD Reference: Z-66 plan P273 @ 103.15ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: Plan Iv'Z-66(SC)v6 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-66 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#18 Z-66 v6 Offset TVD Reference: Offset Datum Reference Plan#18 Z-66 v6 Filter type: NO GLOBAL FILTER: Using user defined selection&filtering criteria Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 5,000.00 to 13,593.89ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 3,000.00ft Error Surface: Elliptical Conic Survey Tool Program Date 11/15/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 46.95 1,200.00 Plan#18 Z-66 v6(Plan Z-66) GYD-GC-SS Gyrodata gyro single shots 1,200.00 2,700.00 Plan#18 Z-66 v6(Plan Z-66) MWD MWD-Standard 1,200.00 3,599.00 Plan#18 Z-66 v6(Plan Z-66) MWD+IFR+MS MWD+ IFR+Multi Station 3,599.00 5,100.00 Plan#18 Z-66 v6(Plan Z-66) MWD MWD-Standard 3,599.00 9,872.00 Plan#18 Z-66 v6(Plan Z-66) MWD+IFR+MS MWD+ IFR+Multi Station 9,872.00 11,370.00 Plan#18 Z-66 v6(Plan Z-66) MWD MWD-Standard 9,872.00 13,593.89 Plan#18 Z-66 v6(Plan Z-66) MWD+IFR+MS MWD+ IFR+ Multi Station Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) EX HIGHLANDST HIGHLANDST-HIGHLANDST-HIGHLANDST 12,470.29 8,900.00 1,038.45 79.91 1,037.69 Pass-Minor 1/200 11/15/2012 9:40:22AM Page 2 of 9 COMPASS 2003.16 Build 73 Project: Prudhoe Bay Site: PB Z Pad Well: Plan lvi Z-66 (SC)v6 Wellbore: Plan Z-66 From Colour To MD Design: Plan #18 Z-66 v6 1° 47 500 h ,� 500 1000 1000 1500 From Surface to 1500'md i 1500 2000 Scan interval 25 ft �-. 2000 5000 Scale 1 : 30 0, All wells pass major risk ti� by 5000 7000 0 oti \t' 7000 9000 \` ,4410�A 4' 9000 14000 \ 0 e. 1_ /' 330 /�'' 11852\, ---.7,- - '�� 30 % ; 1160 �� ` % � 113 rI w�kIr.it ' ''�r- IIgo �:4/44�� j t" ilbrAi oti & i1T1i ,6 70,3V5' �.�Y* i 41._; tit ► iii sT i -- �V,"--i�! 4� 300 + . ,IV 1 ' r,'�, 1 10 882 a '`•t4,4! 1 24 07 60 �� 11 r.i 10 721( 1 2 '9,1'• 31 .1.8 X12+11 X93.5 1 ' ` t:0V-�'O.. �iijp11"_- h 5$ it:0V— % AI��'�,� 886 / ;i 0 _ >= =�° /�f �i51. `�,��►_. ,a2 ---S„ J tokok -W fir r el i/iiirdp,..,1„ ,;10,,,,........ ,,kyll .0.,.../ v' '�// 1 ���•r��4b �� �•.� y,A ii41 Go,� I�_ ?011itiSliiir 4* �i:.L*✓ /-,. ;‘01111k.-IgiNnt111/1p er,,...11. , I . .p toi &I.,* i r 616 ,.. ......,._., ♦�. ,+ ri + 1.40 9� 4.15 \- • �� p'' ti ,j;0,-_ 270 ` I I.:f+► I .t 90 .295 �\` S" \ Ni318 �1 - V / 2 1365 1 21 ` ' 1 1388 14404 I40 Q 240 \\ \ �11,4 r ti� 120 1►t tiO 5<J"`1 Ilk 80,------ 210 150 100 180 Travelling Cylinder Azimuth (TFO+AZI)[O]vs Centre to Centre Separation [30 ft/in] Project: Prudhoe Bay Site: PB Z Pad Well: Plan Ivi Z-66 (SC)v6 Wellbore: Plan Z-66 From Colour To MD Design: Plan #18 Z-66 v6 47 500 500 — 1000 1000 1500 From 1400'md to 3600'md (9-5/8") 1500 __ 2000 Scan interval 25 ft 2000 5000 Scale 1 : 50 All wells pass major risk 42 5000 7000 ,:' �v — o ,^ 7000 - — 9000 �• C74 ' 4` ,, :' A' 9000 — 14000 L r 330i » - ♦?, wei Vi • .>- �j ,;,�'° g r.} ";,•,_°1A70 4 • • & fif+ , • ..; , ,1 `� *i4 '.± mo . q ' ti si > � 1.r ASO yi li ��� l r�1j�.=r''�II► ► i/11 440490d, ' AVo ms'sAU i��wippi�,y' -119 :A-199-AL �+: opikortitymtif �,300 i- .-��..;+1.��,.�.i�e��N�„ =1 -,,, .' ►l►A ,, '„i► 7 ` s )1,10i -Alp vyi-----aiv-lbza.AhmwaweAwowsvriaip• - . 6,,,f, 4 g 1 4 .40.4.4 ,,,,,,„ ...._,_-.........,:,., 11111401WNWAAIVIIVAti- ,- Ara' 413\x33 , ++� 1452 14 + 270 \ ] , j / 151 1525 15ti...4\'''° ,/ � -\ \ 1143 \ ov �1 - 'ilik-\\--- -- _ _ ��1 A! , • ,..tf,..f osk,- - __•,_ : ,,,iii,,,,,„ 240 ” ', `' ....„ 120 • filit10ik. 4,..,fil 150 \` 210 150 180 Travelling Cylinder Azimuth (TFO+AZI)[0] vs Centre to Centre Separation [50 ft/in] Project: Prudhoe Bay Site: PB Z Pad Well: Plan Wellbore: Plan Zlvi 66Z-66 (SC)v6 From Colour To MD Design: Plan #18 Z-66 v6 47 500 500 1000 _ 1000 1500 From 3600'md (9-518") to 9900'md (7") 1500 2000 Scan interval 25 ft m0 5000 Scale 1 : 100 e Hiland State fails major risk �0 5000 7000 passes risk 1:200 rule 0 /,b� 7000 9000 ,^N' / l9000 14000 ::„.$11:i04010Eroi 1�/��NOIVfttt'U/'1 94'1 ,�d1`;►S _ 330 ::�•• �s% Project: Prudhoe Bay Site: PBZ Pad From Colour To MD Well: Plan lvi Z-66(SC)v6 Wellbore: Plan Z-66 Design: Plan #18 Z-66 v6 47 500 500 1000 1000 1500 1500 2000 From 9800'md (7")to TD 2000 5000 Scan interval 25 ft 5000 7000 Scale 1 : 100 Hiland State fails major risk 7000 --- 9000 passes risk 1:200 ruleo 9000 11500 11500 13000 330 13000 13600 330 / 30 ^� 0 27 4/ V 4 Aid //� I Nli 1 :5 , " ,:,i� 300 11‘ 60 14"ill 10,'011•111 lippli4 3330 •440/111PRIVW4A\ ‘,c, 41111111m04&,4* iiiiheins- .A A .. ,A,,.. , , ,,A i,„gme.„„t,4.,t ',1 ,,270 iiiiiiiinc* holo po ` `;tt. Ail - " 44 i. 1(1111111111416. 11 Nue Rost4.4.411,,•imale iirsiitossilqiure 240 �/ 'ilik4iii.,viss", Iiiis.%dri-ti r� 120 ialliniatik0111111041/ iL 3230 NV/ • 1 210 , 1N 180 Travelling Cylinder Azimuth (TFO+AZI)[O]vs Centre to Centre Separation [100 ft/in] , i 17' W - % , c c 0 o0 0 O eg i I:r1 2 ,T• ". 2 g _. i' [I 01 eg og z • % ;33 9 5 -;2' .= t..• ..-,-,. I ,•-r' 1: I ! ft 0 i IOI 1 1:111.11,..k i to 10 s. ,11- , "111... I 111 1116—Irciir = L ' N 0H og ,..4, oH oi .01 01 oH .11 e •., I ik•' . 1 110 ! , •4.., ,--ip • .4 NI. 1 C fib:--'- . _ )1 '1f,'• i '1111 4 L el ,.,1 Ilkell111111=1111111.- H ,,,. . 4 , >__ im..____ _ _41 vl -0 ,..----- --, 4, tili ,' • aifIIIIIIIIMIIIIIIIIIIiw ; . :411.1 ,:il .. (0 1 i - I 'd a all IMMIIIIP.' 11W. k..... IIII I 4 1 l'-i--ic---r- 4 Ai -. •;', ': ' we ..." . . ! • '7-.:. •-i LA ' , i! • :. MIN 1 111t... , ,,..miI .... , i i 7 ,• a? •• 7' 1.a, :., .. II '—Pi ' ' C)1 I HI 71 . !. I. 1, ill .. III :—•-• 1111 1 i I III I I ., ..... 'I II 71416\ 7,••••••,..—,..— 1.1111111 ; r-.....____ ---- -7.-_ • . ....",7:-. \144V yr . 1-1 A, -, I o 1 I • — c'...- . J,-- — : I I i ir— ,.,. :F_••• - i •`:-.' ----1 1, ........ 0 ..„._ J / III I \II./ 1 III III I 11 1 .... '—' (:) 111 ,.› wur I -.., E.• :'.. , '.T.' , 2 :] r rraCitrf d. ,... t C. 01 N - GRID C�) > Ii,- I N• T` -' i). SPINE RD 9 ■ ■ 33 ` '• l ��, a ■ ■ 32 ,.tit ( 4 `'._.\:4,v I' t � r 7 ■ ■ 31 +I C W-PAO' 6 ■ ■ 30 ��( 115 ■ ■• 29 Z-PAD 1I11; � t� , 108 • ■ 210i I.4 Ai 4 ■ ■ 28■ 1021 ��� 3 ■ ■ 27 THIS PROJECT N . r 1(;.- • 116i ) IQ2 ■ ■ 104i 1' %./....J.,1 ^ V c. I! II ■ 1141 1 5 31 il 1 ■ U SPARE-A • P-504A ® .. ■ P-5040 .1:1 1 t:1 , k4 .f2JV nO - VICINITY MAP El NTS ■ 21 ■ 22 39 ■ 11 ■ ■ 23 12 ■ ■ 24 13 ■ II 14 • ■ 26 OWIllq� 15 • i SLOT �`•�,r OF 4. ,Ia 16 ■ ■ SLOT 4 P�.• •. ,,..;.4' ♦ VII 17 ■ ■ 101 •'`Gj�.` 1-1•4"- ...I ,iii SURVEYOR'S CERTIFICATE. 18 ■ • I� s*• S I HEREBY CERTIFY THAT I AM • 46 • :.. PROPERLY REGISTERED AND LICENSED 19 • Z-PAD 00 TO PRACTICE LAND SURVEYING IN ki THE STATE OF ALASKA AND THAT 29 ■ 4••1• THIS AS-BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT ' S0 „WM Ichard F, Allison oSUPERVISIONANDTHATALL51i • .a DIMENSIONS AND OTHER DETAILS ARE 68 202 % • 641$ . .4- CORRECT AS OF JULY 02, 2011. III SD 70 B18i gift ESSIG � %), SG 2155 - 113 '<<��«� ��0�`,`� 2161 i 21411 t N69K SL 2 3i I n LEGEND 10055 - 21071 • AS-BUILT CONDUCTOR 68 412i 11 EXISTING WELL CONDUCTOR NOTES: 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, HAD 27. 2. HORIZONTAL CONTROL IS BASED ON Z PAD CONTROL MONUMENTS MON 2 AND MON 3. 3. VERTICAL CONTROL IS BASED ON Z PAD MONUMENTATION. 4. ELEVATIONS ARE BPX MEAN SEA LEVEL (M.S.L) DATUM. 5. GEODETIC DATUM IS NAD27. 6. PAD AVERAGE SCALE FACTOR IS 0.999911213. 7. DATES OF SURVEY: JUNE 28-30, JULY 1-2, 2011. 8. REFERENCE FIELD BOOKS: NS11-44 PGS. 1-75; NS11-46 PGS. 1-9. ' AS-BUILT WELL CONDUCTORS: - 34i, 40, 42, 50, 511, 55, 57, 61, 62, 65, 66, 68, 69, 70, 105, 113, 115, 201, 202, 203. 2111, 212, 2131, 214i, 215i, 216i, 2171, 2181, SD, SG, SL, NK F. Robert. CRAM BARNHART hit4. NEC• p x• r JAC08S ."f 7/1/11 b„,A rofto%AM: ISSUE. vRen NM z/ WOA Z-PAD U IJba o WRD PAD EXPANSION seux w 7/1/1116A4D RR 9V01 aAUa1 1111A; ,• . AS-BUILT WELL CONDUCTORS 1 DF 3 OM KR RIK•010 UleNO. DATE REVISION DT Cwc AM.Aau MY LOCATED WITHIN PROTRACTED SEC. 19, T. 11 N., R. 12 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS Y= 5,959,100.13 N= 1,179.09 70'17'51.597" 70.2976658' 4,292' FSL 341 X= 600,125.84 E= 1,870.12 149'11'20.998" 149.1891661° 56.1' 2,552' FEL Y= 5,959,100.17 N= 1324.00 70'17'51.616" 70.2976711° 4,294' FSL 40 X= 599,980.94 E= 1870.16 149'11'25.221" 149.1903392' 56.0' 2,697' FEL Y=5,959,239.95 N= 1,126.45 70'17'52.965" 70.2980458' 4,431' FSL 42 X= 600,178.47 E= 2,009.96 149'11'19.409" 149.1887247' 56'0' 2,497' FEL, Y= 5,959,100.19 N= 1,473.93 70'17'51.636" 70.2976767' 4,296' FSL 50 X= 599,831.02 E= 1,870.18 149'11'29.591" 149.1915531' 56'2' 2,847' FEL Y=5,959,240.04 N= 1,466.46 70'17'53.011" 70.2980586' 4,435' FSL 511 X= 599,838.49 E= 2,010.05 149'11'29.319" 149.1914775' 55'9 2,837' FEL Y= 5,959,100.12 N= 1,458.95 7017'51.634" 70.2976761' 4,295' FSL 55 X= 599,846.00 E= 1,870.11 149'11'29.155" 149.1914319' 56.1' 2,832' FEL Y=5,959,240.04 N= 1,421.49 70'17'53.005" 70.2980569' 4,435' FSL 57 X= 599,883.46 E= 2,010.05 149'11'28.009" 149.1911136' 55'9 2,792' FEL Y=5,959,239.97 N= 1,376.44 70'17'52.998" 70.2980550' FSL 61 X= 599,928.50 E= 2,009.98 149'11'26.695" 149.1907486' 55.9' 2,747' FEL Y=5,959,239.94 N= 1,436.45 70'17'53.006" 70.2980572' `4,435' FSL 62 X= 599,868.50 E= 2,009.95 14911'28.445" 149.1912347' 56.0' 2,807' FEL Y= 5,959,100.15 N= 1,398.94 70'17'51.626" 70.2976739' 4,295' FSL 55 X= 599,906.01 E= 1,870.14- 149'11'27.405" 149.1909458' 56.1' 2,772' FEL Y= 5,959,100.11 N= 1,443.99 70'17'51.632" 70.2976756' 4,295' FSL 66 X= 599,860.96 E= 1,870.11 149'11'28.719" 149.1913108' 56.2' 2,817' FEL Y=5,959,100.23 N= 1,134.00 7017'51.592" 70.2976644' 4,291' FSL 68 X= 600,170.92 E= 1,870.22 149'11'19.683" 149.1888008' 55.9' 2,507' FEL Y=5,959,239.94 N= 1,301.49 70'17'52.988" 70.2980522' 4,433' FSL 69 X= 600,003.45 E= 2,009.95 149'11'24.511" 149.1901419' 56.1' 2,672' FEL Y= 5,959,100.10 N= 1,384.02 70'17'51.624" 70.2976733' 4,294' FSL 70 X= 599,920.93 E= 1,870.09 149'11'26.971" 149.1908253' 56.2' 2,757' FEL Y=5,959,100.05 N= 1,163.88 70'17'51.594" 70.2976650' 4,291' FSL 105 X= 600,141.04 E= 1,870.04 149'11'20.554" 149.1890428° I 559'' 2,537' FEL Y=5,959,239.90 N= 1,346.45 70'17'52.994" 70.2980539° 4,434' FSL 113 X= 599,958.49 E= 2,009.91 149'11'25.821" 149.1905058' 56.0' 2,717' FEL Y=5,959,240.03 N= 1,361.38 70'17'52.997" 70.2980547' 4,434' FSL 115 X= 599.943.56 E= 2,010.04 149'11'26.256" 149.1906267' 55'9 2,732' FEL NOTES: 1. ALASKA STATE PLANE COORDINATES ARE NAD27, ZONE 4. 2. HORIZONTAL CONTROL IS BASED ON Z PAD CONTROL MONUMENTS MON 2 AND MON 3. 3. VERTICAL CONTROL IS BASED ON Z PAD MONUMENTATION. 4. ELEVATIONS ARE BPX MEAN SEA LEVEL (M.S.L.) DATUM. 5. PAD AVERAGE SCALE FACTOR IS 0.999911213. AS—BUILT WELL CONDUCTORS: 34i, 40. 42, 50, 511, 55, 57, 61, 62, 65, 66. 68. 69, 70, 105. 113, 115, 201, 202, 203, 2111, 2121, 2131. 2141, 2151, 2161, 2171, 2181. SD, SG, SL, NK F. Robert upAavl BARNHART CHE,z:E)JACOBS b F � G0. yt: 1 7/1/11 p FRB11 WOZ 21 WOA Z PAD SHEET: aSSOC. JOS N�. - WRD PAD EXPANSION et 7/1/11 ISSUE:LW INFc DATION TFB JJ • = 20@. AS—BUILT WELL CONDUCTORS 2 of 3 MI Mt RPM.,4W 1NO DATE REVISION LOCATED WITHIN PROTRACTED SEC. 19, T. 11 N., R. 12 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC GRAVEL SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) PAD ELEV. OFFSETS Y=5,959,240.18 N= 1,171.46 70'17'52.973" 70.2980481' 4,432' FSL 201 X= 600,133.47 E= 2,010.19 149'11'20.721" 149.1890892' 56.6' 2,542' FEL Y=5,959,239.94 N= 1,451.46 70'17'53.008" 70.2980578' 4,435' FSL 202 X= 599,853.49 E= 2,009.95 149'11'28.882" 149.1913561' 55'9 2,822' FEL Y=5,959,100.03 N= 1,148.96 70'17'51.592" 70.2976644' 4,291' FSL 203 X= 600,155.96 E= 1,870.02 149'11'20.119" 149.1889219' 56'0' 2,522' FEL Y=5,959,100.23 N= 1,308.95 70'17'51.615" 70.2976708' S5 9' 4,293' FSL 211iX= 599,995.99 E= 1,870.22 149'11'24.783" 149.1902175' 2,682' FEL. Y= 5,959,240.11 N= 1,141.47 7017'52.969" 70.2980469' 56.4' 4,431' FSL 212i X= 600,163.45 E= 2,010.12 149'11'19.847" 149.1888464' 2,512' FEL Y=5,959,240.04 N= 1,271.44 70'17'52.985" 70.2980514' ' 4,433' FSL 213i X= 600,033.50 E= 2,010.05 149'11'23.635" 149.1898986' 56.12,642' FEL Y=5,959,100.25 N= 1,293.88 70'17'51.613" 70.2976703' 56 2' 4,293' FSL 214i X= 600,011.06 E= 1,870.24 149'11'24.343" 149.1900953' 2,667' FEL Y=5,959,100.14 N= 1,354.05 70'17'51.620" 70.2976722' 4,294' FSL 2151 X= 599,950.89 E= 1,870.13 149'11'26.097" 149.1905825' 56.2' 2,727' FEL Y=5,959,240.09 N= 1,316.42 70'17'52.992" 70.2980533' 4,433' FSL 2161 X= 599,988.52 E= 2,010.10 149'11'24.946" 149.1902628' 56.0' 2,687' FEL Y=5,959,239.98 N= 1,156.36 70'17'52.970" 70.2980472' 4,431' FSL 217i X= 600,148.56 E= 2,009.99 149°11'20.281" 149.1889669' 56.2' 2,527' FEL Y=5,959,239.98 N= 1,391.46 70'17'53.000" 70.2980556' . 4,434' FSL 2181 X= 599,913.48 E= 2,009.99 149'11'27.133" 149.1908703' S592,762' FEL Y= 5,959,100.11 N= 1,429.03 70'17'51.630" 70.2976750' 4,295' FSL SD X= 599,875.92 E= 1,870.10 149'11'28.283" 149.1911897' 56.4' 2,802' FEL Y=5,959,100.09 N= 1,369.02 7017'51.621" 70.2976725' 4,294' FSL SG X= 599,935.92 E= 1,870.08 149'11'26.533" 149.1907036' 56'2 2,742' FEL Y= 5,959,100.01 N= 1,279.00 70'17'51.609" 70.2976692' 4,293' FSL SL X= 600,025.94 E= 1,870.00 149'11'23.910" 149.1899750' 56.3' 2,652' FEL Y=5,959,239.85 N= 1,286.54 70'17'52.985" 70.2980514' 4,433' FSL NK X= 600,018.40 E= 2,009.86 149'11'24.075" 149.1900208' 56'0 2,657' FEL NOTES: 1. ALASKA STATE PLANE COORDINATES ARE NAD27, ZONE 4. 2. HORIZONTAL CONTROL IS BASED ON Z PAD CONTROL MONUMENTS MON 2 AND MON 3. 3. VERTICAL CONTROL IS BASED ON Z PAO MONUMENTATION. 4. ELEVATIONS ARE BPX MEAN SEA LEVEL (M.S.L.) DATUM. 5. PAD AVERAGE SCALE FACTOR IS 0.999911213. 6. ALPHA NAME DESIGNATIONS REFER TO BPX DRILLING SURFACE SLOT NAME AS—BUILT WELL CONDUCTORS. 34i, 40, 42, 50. 51i, 55. 57. 61. 62, 65. 66, 68, 69. 70. 105. 113. 115, 201, 202, 203. 2111, 212i, 2131, 214i, 215i, 2161. 217i, 2181, SD, SG, SL, NK F. Robert 01A11N• BARNHART , c.o. Øbp JACOBS „reoI k: "'7 1/11 +; DRAMNG SHEET: _gPp p FRB11 WQZ 21 WOA Z—PAD 'I��SSOC. �E WRD PAD EXPANSION so 7/1/1 ISSUED FOR INFORMATION 1F8 i) ae.me„o wo swwxa NO OF 3 M wn. ,,,E r - zea AS—BUILT WELL CONDUCTORS NO. DAZE REVISION BY CHB AwwaAx MAMA wen ....7. ..... .9 1.1.1. ,..... -,...... ---.......-2..,/ 10. -NI) er _.,1 ,L. gen?, 1 v II I I 0 Sid , FI t. 1 -0-- I __ai'! , I CA . . .---q, IT\. .......,—.—) H I _ 1 n , - E • in . I H 611"U E 4 211 , I V613 r i . e„ t , . • -- t w .r1 II . > vl 3 di. . . -1/4 - lea '.• ,I Lc.. I 9 al i 101 • •,,,c, ' k.C) I S L91-08.- .., — __ .1, :,,fo,. , ks-.) ISLOT ' • _ ::.:. •, ----‘) 4.SI OT 1 ' .• •a N I 20 • . \ 2 5 a III 12 ...? L. N ei 24 . 0 , ‘ — 2 3 • , I 1 . •30 --T 1.-..j2 , -...,, 22 • • 4-, 2 • 7; J "" "ry_11111— , ass . .1, •_____,.., 60 to ...../,..- P 50,1 B 0 Er. 03 1:6•.1 1°3/11: r:2 In 2 _ - ---1 _ - 27 '.1 1(14 1 an an ". a 3 I - ii. 1 Rt a.) I 11 0211 08 78 • 1 .c>45 ' c A 4-) I I I' 1-. ' I I • i •.0 ,, 'Cl.) I 1 • 7 1 _/ i :41 • :: -.> L _ -- 32 • i Ci 1.'r 1 33 . 1 1 r- 1 411 35 I I 4 I ! L' ' 37 ----- ----\ sk.N. 1 0 1,1 il I.,._ .., ! t a 38 4 ie; I z.) el • ‘__ ,, ... ..." .... - I . . 47)......-- I I _.-- kw , .. . .I ..... I .. • ,_ .1-- ' ....0.°11e7-----..------ -N-; iii .....-- ....,...,.......----,- Z —IP. • ..--- 4 mi .....%.--' nor .171ili . ... -.....a ff f f-L..../c).r-im I I mu a mug 11 4 1/16-5000 CR-30) `+;— i MONITOR PORT TEST PORT •F ,/ —- 10 LOCKDOWN SCREWS r j'3,. _ .— / ate=- SCSSV EXIT .r.:,..3,. 5 ; r•-.._11-5000 (R-54) i iv Ofd Via. , . �' ilk _ __ R&,.; ,!)k. iiI. P C. . r r I 1 . 2 1/.6-5000 A101) 120 Gv 2 1/16-5000 MOD 120 GV S $ r © TEST PORT '` i - • 10 LOCKDOWN SCREWS 1. • • . ',-: � it-5000 CR-54) 0 t iE 1 f ) O ,,[Fa; j I7 - + t dim: ,. • 'OP 6..,...:I: I , .: — _! . ^1 , 1 2 V16 5000 MOO 120 Cy ® u / TEST PORT 1 L® 2 v 11-111k 1 m lry. sr _ f ' L, � f TEST PORT •I ti • -----20.OD CASING I 9kir 00CASING 7 OD CASING 4 %2 OD TUBING 0 0 3P C KPLOO GG3lQ `t 9CDN1 CAL G°QeXn. ➢ OHO . 1CX) QD11-77G a°, -SLD IM1V 'LMOLE PReD�©mme © U JJE©T© rRi PROPOSAL �OF�498612-5037 0 REFc00120M1074013 00000141028404(C j PR:vATE AM) CONFtOEN`1A: ux E s o:�fR..Sc Ammo AE.IStoNs lloEscAw*ia Thai .,t. l �M.....i...t.�.... I. NOT SCALE Mi:OR..• TOI.A•CE N ara. r.e•w•r.n.r.,-----1...:,, ULTRA-SL MHOLE �..,ee s N11�0.6...N0.••..ft .........• an DI1WA,•C .IEES 0.IROES 1 .x—_.OJO ppss ten.wN....•e.e�Ls.e.m.. s.ew,c v.w mcEs.o.s N.xN.w � PRODUCERS OR INJEC-0R5 I ""`O�2 os-20-0:141 O IYIO.••"•"'"a.•�••...ICs ..WOE COWS ICON .070 NAx.... I Xx--Ai3 1 A.u..•:.i.R. w.•vowN.+ nalt•OS To comm.n no.so..-z: 1 .xxx—•.005 1 WELLHEAD SYSTEM YAM= 07.20-0:1 0 1 ..•..e...Nv....../.m.s•"..` -I•EAEO TgEAOS TO C0✓aN.TO•NI C.1 - I I-5000 X 4 `./16-5000 4Ji.ra. ' r10.O.1..i M:::=7.•iOlo'.'0- T.ORAnNCS IN TNWO..RE PROJC0.ONS INCE-C X' 1 LEQJ.0 07-`•-•i$.....4 y..dp M•p.A .pI•ftom �.W ALL"..OE...T.0LE5.v7T ST..00LE c5 �': ...+0.E0.. 1 A•.N Q.fY...1.4•..l..OI. zs� , 1 20 X „/8 X 7 X ./z OD120M1080698 j .M/K+w O..>•NM9.Mh...r.t..�NA1 I CON.ON iFATEIC.NE '�M$N- LEaWC .01.20.02, Note: Dimensional information reflected on this drawing are estimated measurements only. 28.63" Est. 1 v Oo ono 4-1/16" 5,000# Q p 0 CD to ISU c O 93.38" O Est. (;-1- 4-1/16" 5,000# O 50.75" Est. ,00.2% 4-1/16" 5,000{ rrn BP Alaska SK-011583-03 a CAMERON Neme:Jeanette 4-1-05 # J-6816-3 agile: NorkinN Preeeurc: TREE= 4-1/16" WELLI-EAD= FMC ACTUATOR= Bectric Z- Proposed I" =n NOTES: ***CHROME TBG`** — KB.B_EV= 470' BF.B_EV= 562'0 ' KOP= 300' MaxAngle_ @09 — ax - 97 10900' 20"CONDUCTOR 108' , .- =---1 TBD —9-5/8"TAM PORT COLLAR Datum MD= 10260' I 2000' —4-112"HES X NP,ID=3.813" Datum TV Dss= 8800' -518",404, L-80,BTC-M,ID=8_835" —I 3599' Al 11 4598' TOC-650'TV D above Sb_Na -1000'MD below surface shoe GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE Minimum ID =3.813" 7 TBD 3295 42 KBG-2 DUM RK 1" 4-1/2" X Nipple @ 9608' MD 6 TBD 4603 42 KBG-2 DUM RK 1' 5 TBD 5451 39 KBG-2 DCK2 RK 1" 4 TBD 6092 12 KBG-2 DUM RK 1" 3 TBD 6735 12 KBG-2 DUM RK 1" L 2 TBD 7646 16 KBG-2 DUM RK 1" 1 TBD 8278 2 KBG-2 DUM RK 1 1" I 9547' —14-1/2"HES X NP,D=3-813" 4-1/2"NDPG SINGLE-SENSOR SUB,ID=x.xxx" — 9575' 9607' 7•X 4-1/2'HES TNT PKR I! ><- D=3.870" 9641' 1-14-112'HES X NIP,ID=3.813" 1-1/2'TBG, 12.6#,13-Cr,VT,.0152 bpf,D=3.958" — 9727' 9714' H4-112"HES X NIP,ID=3.813" 9722' 17°X 5'BKR ZXP PKR&Flexlock HGR w/ILBACK SLV,D=4.4" ,----------LIII 7"CSG,26#,L-80,VT HC,.0383 bpf,D=6.276" H 9872' I I 9727' W LE G 11017-14.1 '5Zi I I 8ea: 4-1/2"HES OBM Sw ell Packers @ ►Mi TBD,TBD,TBD',TBD I I ..] TBD,TBD",TBD,&TBD I I 8ea: 4-1/2"HES Sliding Sleeve @ I I TBEY,TBD,TBD',TBD, TBD,TBD,TBD,&TBD I I I I 13509' —1X0 4-1/2"Hydri 521 x 4-1/2"VTI I I 13619' 1BHI Locator Sub 0=3.91"VT I 4-1/2"CEP(Post Rig) H 13523' 3-1/2"HES OBMAnchor Swe®packer VT I--I 13538' 13527' —I XO 4-112'VT x 3-1/2"VT XO 3-1/2"VT box x 4-1/2"IBT pin 1—I 13672' 0 0 13582' —14-1/2'Float Colar BT I 3-1/2"LNR,12.6#,13085 Hydri 521,D=2.992'—I 13594' 1111111111 13593' -J4-1/2"Float Shoe ST 08/221111 KEH Proposed Completion WELL: Z-66 11/05/12 ZHB New Z-66 schematic FERMI!'No: 11/14/12 ZHB Update to depths API No: SECXXTWA'XXN RGEXXE FSL XXXX'FEL XXXX' BP Exploration(Alaska) Bettis, Patricia K (DOA) From: Browning, Zachary H [Zachary.Browning@bp.com] Sent: Monday, December 31, 2012 2:02 PM To: Bettis, Patricia K(DOA) Subject: Z-66 Anticipated pressures Patricia, The correct values for the Z-66 anticipated pressures are as follows: For the Intermediate Interval: Maximum anticipated BHP 3772 psi at the TSGR at 8505'TVDss (8.53 ppg EMW) Maximum surface pressure 2921 psi (.10 psi/ft gas gradient to surface) For the Production Interval Maximum anticipated BHP 3850 psi @ TD at 8910' TVDss (8.31 ppg EMW) Maximum surface pressure 2959 psi (.10 psi/ft gas gradient to surface) Thanks, Zach Browning Rotary Drilling Engineer BP Exploration (Alaska), Inc. W:(907)564-4664 C:(208)301-2214 Zachary.Browning@bp.com 1 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME Palk 2- (ec PTD# l 9./ qS ? Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: ?Ru1/4(.1 POOL: ?r,kc.iho/-_ cs,i ?r ,J Lo, 0,1 Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 F -a E c) 0) o E O 0 N N v Cl) 6 o) a o o m n E c o N c Q T_ aiO co oi O W 'o U O N 00 7 C co C _c E (0 O O) c a) .0 3 n 03 > O _ 2 m n __ o -o o > co > L L > W a W v7 _ c 06 Ui CI O ° o T ) Y oL. 0 .N 0 `o O X '00 co a a Co a m ° n a) 0 C) 0) 0 _ a a) o o -p c "- a m a _c x- w s Co w p a) a = 3 c 3 N N co @ N N c v r = C..) c 0 p v g o rn c o• -o O c co C n OU 0 c p Co _, O a To co (o D 0T C Co 0 a) > cNI . ,- — E ND V ( a ` o aO ' N • aUUW NNN u) 6Na Oo3 co ON O O Op 0 0) Oa N co CL z O CO > o — C C a) O a M N n L J i O C N O a) W O_ (6 (n CV (0 m T. co on J N ]. Od co '• C co -° N O > Q Co oo (oi 0 Co O o iN a m = c m C O O (0 C O� '� a) N y0 .0 OT W O U) N O W ° p a c -o3 _0 Nc 0 a) ° a a m o c o o 0 05 C O +- = 3 n m E -o c m an) aco ci ac6i N E o a) a) n 0 3 - 3 ° m .4 0 a �' U Q) p L p a) O �) a) N -O N fn = a) U F m s c N 3 Q n > E o 3 m � a a Co ' CV C a - (,i - = WW co 0 _c w - a 0 o u) rn = .° m 0 0 cn Q 0- a) Co 3 Q 0 a) 'n >' .c x (n n iE a) Z 3 Q N m T O N O • 0 co 3 Co U Co N g>, Co co c ° E 0 N (O CC w Coco (o 7 ` `Co a) c � • y -0 .0 N N 2 a) a (6 a0 CO a). n "O w 7 E = N T ._ N n ac O N d (0 a) Z (NO N a 0L M C OU O CO a O p N N a) Q J D D Co C X a) n (n N w Q a Cr a 0 L N z o i'- co E a s w 0 2 2 N W D co a o 0 0 w Co J a 00 M < < aa)) coNN) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) < < < aa)) < CO O aa)) aa)) N) < aN) o0)) aa)) aa)) aa)) a0) a) < o aa)) < < < •`I ` Q zz > >- >- r >- >- } >- } r >- >- zzz >- z } z >- >- rz >- >- >- >- >- >- >- >- z z >- z z z T J F Cl) co O co LL T 0 CH U Ta Ilk i co C�0 o =\U,D ' -5 , T 0. n C a C L OO (n *k ° c = % 0 m- -`00 3 3 ° co O a) co U) U i _ 0 C N Z 0 > (6 O O ° a) -,- T.) > n o Lu N @ a) 0 U n O O U) x. O `�- 7 0 •C• C N co O C. V 7 Q a p N cn O. C cr O O) �, O co N N (0 D a j C - O N "' N _O 't C E _ U) a CO C O E N 2 O O O C > C >0 y0 O O C N > a) < MO co 3 'c O 03 3 = -Op a > 3 p N n N .o O n d O 0 'O 0 co Q - a`) 0 a) is T 0 -0 o 06 E a) m co O 0 _ o co U �O = L 0) U Z fn CO 7 3 2 (n C C) .0 C rn a 0- O LO 3 Q U) N a)' N o) W - •_ 'O 0 C 0 0 a) C N 0 a D O C 0 m 0 ° o) a) a .0 C C 2 C p .. a) N ' CO > U > 'p n O U N O O O)a) Q CO E E — "O C C E @ N O C C (n 'U F .. C O o(f C Q' C a) .,_ ,_ N N n C O • Y Q o o a` -o@ E n o 0 0 ° °) 0 U nco a o - o a ° a •3 ° > m Y m'N D Q o o Cl) a) o o ° p Co • Y o o Cl) m o ° Co m io Q m o 0) o Cl) u -Jcr ° U U a) > o 0 o c Cl) m = m o Z o E 3 3 a) o 0 .0 (0 3 'a Cl) E a Q E C C 0 0 a5 N d 0_ Co L t - Co Ca 'CO N N - .07 C. Co 030, Co U) U N O` N 0 ° 3 0 ac) (0 N o W 0 o z a s C U) ° 'Co 2 -o C 3 3 > E a) . 8 ( r 0 0 a s coo ,-N o_ .- .- co Q Co ° 3 o .0 Z 0 00 O C p C '— -° -° > o a) p_ "o "o p (0 E o p a) O O 0 o' o N 'D a) (6 O n c -o n cn O a) 11 F p -o a m o a`) a`) o -0 i) o > > a c 0 0 , a) o E a) E r o a) ,� c 06 Q U L n a) n n O N n rn N n L V a) a - '3 — N c) -p CC52 E O) 0 N . r7 CO0 C L 0 as ° o O °' ° n rn rn rn a 0 co Cocom o rn 3 o m o U E m 3 m m m c c CD 0 0 U) m cn o aa) .o 13 =_ c u) a .N o n LL• O 0,m Co .0 C 0 "O 0 U — C Co .0 .0 .0 0 1E 0 in ' a) a) > O) co a) ° a .— N - U ° .0 C Co C E a C E .) a) a) a) co -0 0 .0 C C - a) U Co 'O P O N 3 ._ O coC p Cl) Co CCI) C C X > 0 3 o io io a) Co Co E Co 3 0 `o U (o ca U a) a) = Cl) 0 0 m = (� Co 0 Co c H w c c () 0 0 c `o `o ° ° U m ° U a) o o - (o `o m °) v n E a) 'c 0 0 0 a p ... 0 a) m .. .. o 0 0 0 .3 0 0 r a) 3 (o a a) U CO Qi J CO C .5 N .E- 0 0 0 2 '� a) a) E E c- 0 3 a - F F F 7 a5) '- as) (> a a o ._ L c_, E co co m c o T ° Q) of c 0 a) a) 0 0 n n Cl)` Cl)` Co a) - m 0 0 2 2 2 co -o Co -0 ' = 0 0 _c ° 0 a) 'Cr) Co Cl) a) o 0 0 c z a J D co 0 0 a a 0 Q a` 0 co 0 0 0 0 Q Q o co co 0 Lo 2 a 0 (0 (0 0 W n N- O N M Co (() CO CO 0) O N M V (() (O N 00 0) O N M V (C) (O I- 00 O) .= EO r r r N M V l0 (0 I� CO 0) '— r .— N N N N N N N N N N M M M M M M M M M M F. co co co C a) 2 O C Co ON Co ON ca N U O {�. O C cN- O 0 .a N y a) E I- o a s W a COa 0 Q Q Q s Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. BP Exploration Alaska Inc Well: Z-66 Field: Prudhoe Bay North Slope, Alaska, USA Report Production Array Log Analysis Prepared For : BP Exploration Alaska Inc Logging Date : 01/31/2014 Report Date : 02/07/2014 Submitted by: Waqar Khan Phone: +1(281)575-5051 10200 Bellaire Blvd, Houston, Texas-77072 Email: waqar.khan2@halliburton.com HALLIBURTON DOES NOT GUARANTEE THE ACCURACY OF ANY INTERPRETA TION OF THE LOG DATA, CONVERSION OF LOG DATA TO PHYSICAL ROCK PARAMETERS OR RECOMMENDATIONS WHICH MAY BE GIVEN BY HALLIBURTON PERSONNEL OF WHICH APPEAR ON THE LOG OR IN ANY OTHER FORM. ANY USER OF SUCH DATA, INTERPRETATIONS, CONVERSIONS OF RECOMMENDATIONS AGREES THAT HALLIBURTON IS NOT RESPONSIBLE EXCEPT WHERE DUE TO GROSS NEGLIGENCE OR WILLFUL MISCONDUCT, FOR ANY LOSS, DAMAGES, OR EXPENSES RESULTING FROM THE USE THEREOF BP Exploration Alaska Production Array Log Analysis 1 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY ......................................................................................................................... 2 2.0 BACKGROUND AND OBJECTIVES ...................................................................................................... 3 3.0 WELL INFORMATION AND DATA QUALITY ASSESSMENT .......................................................... 4 4.0 PRODUCTION LOG PROCESSING........................................................................................................ 7 4.1 FLOWING SURVEY ................................................................................................................................. 9 BP Exploration Alaska Production Array Log Analysis 2 1.0 EXECUTIVE SUMMARY Production logging was done in Well Z-66 on January 31st, 2014 using PDS in flowing conditions with the objective to estimate the production profile. As the well is deviated, Resistance Array Tool (RAT) and Spinner Array Tool (SAT) were included in the tool string to accurately estimate the holdup and phase velocities as there can be segregated flow of the three phases due to well deviation. Initially Halliburton had logged the interval but owing to memory sub failure, data wasn’t able to be retrieved. It was decided to re -run the Z-66 PLT with a PDS MAPS toolstring. The flowing PL analysis showed the bottom two sleeves (12697’ – 12701’ and 13100’ – 13104’) contributing 50% of the oil production. The bottom sleeve (13100’ – 13104’) is also the main contributor to the water production, 37%. The reported surface production rates February 1st, 2014 were The estimated flow rates at surface condition while flowing from each of the perforations and the production profile is given in the table below: Perforations Oil Rate Water rate From , ft To , ft STB/D % STB/D % 10325.5 10330.5 0 0.00 125 4.43 10646 10651 52.4 10.52 78.1 2.77 11111 11116.5 28.4 5.70 114 4.04 11295 11299.5 64.4 12.92 523 18.54 11606 11612 45.1 9.05 0 0.00 11831.5 11837 60 12.04 60.4 2.14 12393 12398.5 0 0.00 627 22.22 12696.5 12701.5 123 24.68 259 9.18 13100 13104.5 125 25.09 1035 36.68 Total 498.3 2821.5 BP Exploration Alaska Production Array Log Analysis 3 2.0 BACKGROUND AND OBJECTIVES The objective for running the PL was to identity if it’s possible to shut off sleeves to reduce water cut. BP Exploration Alaska Production Array Log Analysis 4 3.0 WELL INFORMATION AND DATA QUALITY ASSESSMENT Well Z-66 is completed with a sliding sleeve having an ID of 3.813” across the logged interval. The wellbore schematic is presented in the Figure 1. The tool string diagram used for the PL logged is presented in Figure 2. The tool string consisted of the following production logging sensors: Gamma Ray - Casing Collar Locator – Pressure - Resistance Array Tool - Spinner Array Tool – Radioactive Density – Capacitance Water Holdup – Temperature – Caged Fullbore Spinner. The data quality is summarized below TOOL USAGE LOG DESCRIPTION LOG QUALITY REMARKS WELL BORE PARAMETERS QP Well bore pressure Good Down 30 pass has a wavy pr. response TEMP Well bore temperature Good FLUID TYPE FDR Radioactive density tool uses radioactive source and detector to measure density and is a center sample device Good Down 30 pass spikes inconsistently as compared to the other passes CWH Uses capacitance to measure the differences between hydrocarbons and water Good RAT Resistivity Array Tool Good FLUID VELOCITY CFB Caged Fullbore Spinner Good SAT Spinner Array Tool Good . BP Exploration Alaska Production Array Log Analysis 5 Figure 1: Wellbore Schematic BP Exploration Alaska Production Array Log Analysis 6 Figure 2: PL Toolstring BP Exploration Alaska Production Array Log Analysis 7 4.0 PRODUCTION LOG PROCESSING The production log data from the flowing were processed using the PLATO software. The software uses a global probabilistic method for the production log analysis. In this method, known as the Maximum Likelihood method, a well flow model is compared to all available data and improved, by optimization, until the best possible match with the data is obtained. By using this method the result is the most likely interpretation. A comparison between the model and the data is shown in this report and allows the analyst or the reader to determine validity of the answer obtained. Potential sources of discrepancies include tool measurement errors, conflicts between the parameters or conditions that make the underlying empirical models (such as flow regimes) less applicable. The flow regimes were determined, directly from the flow rates and holdups, according to the Taitel- Dukler analytic model. The profile factors, to calculate the true fluid velocity from the apparent velocity, were based on the Reynolds numbers. Solution gas in oil was derived from the correlations (Vasquez-Beggs or Øistein- Glaso). The analysis was performed in six steps: The data preparation to filter the data, compute gradients and error estimates. The calibration of the array tools and full-bore flow meter. The computation of the layered holdup and layered flow -rates. The profile determination to identify the potential producing and/or injecting zones. The computation of the flow rates by global optimization. The computation of surface productions and reporting. BP Exploration Alaska Production Array Log Analysis 8 The water density and viscosity were calculated using a salinity of 20000 ppm. The Craft & Hawkins correlation was used. The oil density and viscosity were calculated using an oil gravity of 27.1 API. The Vasquez & Beggs correlation was used to calculate the solution gas. Viscosity was calculated using the Beggs & Robinson correlation. The Pc and Tc parameters were calculated using the Brown et al. correlation. The gas viscosity was calculated using the Lee Gonzales Eakin correlation. Utilizing the above fluid information, measured down hole oil density, temperature & pressure, the following fluid properties were calculated at well conditions: feet Twf Pwf Bwater water water Boil oil oil °F psi UNITY g/cc cP UNITY g/cc cP 10026.00 230 2562 1.04 .984 .289 1.07 .836 4.21 10377.00 230 2645 1.04 .984 .289 1.07 .836 4.21 10728.00 229 2633 1.04 .984 .290 1.07 .836 4.22 11078.50 229 2625 1.04 .984 .290 1.07 .836 4.22 11429.50 229 2654 1.04 .985 .290 1.07 .836 4.23 11780.50 229 2650 1.04 .985 .291 1.07 .836 4.23 12131.50 228 2638 1.04 .985 .291 1.07 .836 4.24 12482.00 228 2638 1.04 .985 .292 1.07 .836 4.25 12833.00 227 2666 1.04 .986 .294 1.07 .837 4.27 13184.00 225 2644 1.04 .986 .296 1.07 .837 4.30 Tool information The following capacitance tool characteristics were used HydroWater Hz 28626 (Downhole Measurement) HydroHyd Hz 31120 (Surface Estimation) BP Exploration Alaska Production Array Log Analysis 9 4.1 FLOWING SURVEY The raw data from the flowing surve y are presented in the Figures 3 to 8. Figure 3 has the data from conventional production logging sensors. Figure 4 has the same data that was presented in Figure 3 with the addition of the station measurements. To generate this plot, Emeraude software was used which allows overlay of the station measurements and the logging passes in the same track. Plato can only plot the st ation measurement against time. Because the DOWN 30 pass shows an inconsistent response compared to the other passes, it hasn’t been used in the interpretation. The response from the Resistance Array Tool is presented in Figure 5. In this well, RAT was run with only 6 sensors and hence only the sensors 1, 3, 5, 7, 9 and 11 are active. The remaining sensors are reading some default values. Only the active sensors were used in the interpretation. Figure 6 shows only the active RAT sensors along with the station measurements. The response from the Spinner Array Tool is presented in Figure 7. Both the full-bore and array spinners show good response across the logged interval. Figure 8 shows the station measurements. From the spinner response, the velocity profile was estimated u sing the slopes calculated from the spinner calibration (Figures 9 and 10). The calibrated RAT response is presented in Figure 11. The estimated SAT velocities and the RAT holdups are used to calculate the flow profile presented in the Figure 12. The final flow profile, after the global optimization, along with the comparison of the measured and theoretical tool values are presented in Figure 13. The production rates at surface conditions estimated from the production log ana lysis are presented in Figure 14 and are summarized in the table below: feet Profile Qp-Water-STP Qp-Oil-STP BFPD BFPD 10325.50 10330.50 Produce 125 0 10646.00 10651.00 Produce 78.1 52.4 11111.00 11116.50 Produce 114 28.4 11295.00 11299.50 Produce 523 64.4 11606.00 11612.00 Produce 0 45.1 11831.50 11837.00 Produce 60.4 60.0 12393.00 12398.50 Produce 627 0 12696.50 12701.50 Produce 259 123 13100.00 13104.50 Produce 1035 125 BP Exploration Alaska Production Array Log Analysis 10 Raw Data - The figure below summarizes the input data recorded at the well site. - Each pass is shown with a fixed predefined color. Figure 3: Input data from the conventional production logging sensors BP Exploration Alaska Production Array Log Analysis 11 Figure 4: Input data from the conventional production logging sensors along with the station measurements. BP Exploration Alaska Production Array Log Analysis 12 The figure below shows the RAT input data. The first track shows the RAT rotation curves for each pass. The next tracks show the RAT data: A curve for each pass for each of the 12 probes. In this well, RAT was run with only 6 sensors and hence only the sensors 1, 3, 5, 7, 9 and 11 are active. The remaining sensors are reading some default values and were not used in the interpretation. Figure 5: Input data from the Resistance Array Tool (RAT) BP Exploration Alaska Production Array Log Analysis 13 Figure 6: Input data from the Resistance Array Tool (RAT) showing just the active sensors along with station measurements BP Exploration Alaska Production Array Log Analysis 14 The figure below shows the SAT input data. The first track shows the SAT rotation curves for each pass. The next track shows the line speed for each pass. The remaining tracks show the array spinner data: A curve for each pass for each of the 6 array spinners, and fullbore spinner. Figure 7: Input data from the Spinner Array Tool (SAT) and conventional spinners BP Exploration Alaska Production Array Log Analysis 15 Figure 8: Input data from the Spinner Array Tool (SAT) and conventional spinners along with the station measurements. BP Exploration Alaska Production Array Log Analysis 16 Depth Matching No depth matching was required for this well. Pre- Processing Figure 8b: DOWN 30 pass has been excluded from data averaging. BP Exploration Alaska Production Array Log Analysis 17 Calibration of Spinner Array Data Shown on the image below from left to right: Track 1: Incoherence between the theoretical and measured Array Tool responses. Track 2: Line-speed for each pass. Track 3: 'Unwrapped' rotation curve for each pass. Track 4: Normalized layered velocity profile. This profile is optimized by comparing the measured and theoretical SAT response for each pass of each spinner. Tracks 5-10: Measured and theoretical SAT responses for each spinner. Track 11: Measured and theoretical responses for the full-bore spinner. Below are the results from the calibration of the SAT data. The determination of this calibration is a layered velocity profile. Figure 9: Velocity profile from SAT data (Displaying only DOWN 20 pass data) BP Exploration Alaska Production Array Log Analysis 18 The image below displays cross plots for each SAT spinner and the Inline spinner. The estimated slopes are used for converting the spinner response to flow velocities. Figure 10: Spinner cross plot BP Exploration Alaska Production Array Log Analysis 19 Calibration of Resistance Array Data Shown on the image below from left to right: Track 1: Incoherence between the theoretical and the measured RAT responses. Track 2: 'Unwrapped' rotation curve for each pass. Track 3: Normalized layered RAT profile. This profile is optimized by comparing the measured and theoretical RAT response for each pass for each probe. Tracks 4-9: Measured and theoretical RAT responses for each probe. Below are the results from the calibration of the RAT data. The determination of this calibration is a layered resistivity profile. To obtain this profile, calibrations for water/ hydrocarbon were entered for each probe. Figure 11: Calibrated RAT response. BP Exploration Alaska Production Array Log Analysis 20 Holdup and Velocity Profile: Shown on the image below from left to right: Track 3: Layered velocity profile. Track 4: Layered water holdup profile. Track 5: Layered oil holdup profile. Track 6: Layered gas holdup profile Track 7: Total holdup. Track 8: Cumulative flow rates Track 9: Density of fluid Track 10: Apparent Velocity from Fullbore Spinner Figure 12: Holdup and velocity profile BP Exploration Alaska Production Array Log Analysis 21 Flow Profile The quantitative production rates were determined by comparing the well flow model with all available data. The figure below is provided to verify the agreement of the flow model with the data. In this figure the data is represented by the blue curves, whi le the calculated tool values are shown in red. The uncertainty interval is represented as a gray band around the data. The uncertainty interval corresponds to one standard deviation. The small fluctuations around the data are to be expected, since the to ols have intrinsic errors. Large sustained discrepancies indicate problems with the data, conflicts between parameters or conditions that make the underlying empirical models less applicable. To the right of the figure the flow regimes are shown. Within the transition zones several regimes can exists intermittently. Figure 13: Flow profile at reservoir conditions BP Exploration Alaska Production Array Log Analysis 22 The production rates at surface conditions are presented in the figure below: Figure 14: Flow profile at surface conditions (Gas displayed is gas in solution)