Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-0097. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 18-02C Mill CIBP, Patch Perforations Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-009 50-029-20762-03-00 13805 Conductor Surface Intermediate Liner Liner 8616 80 2584 2855 7562 3872 11800 20" 13-3/8" 9-5/8" 7" 4-1/2" 8690 47 - 127 46 - 2630 44 - 2899 2684 - 10246 9928 - 13800 47 - 127 46 - 2630 44 - 2899 2684 - 8228 7969 - 8616 ~13708 (2) 470 2670 4760 5410 7500 none 1490 5380 6870 7240 8430 10292 - 13250 4-1/2" 12.6# 13Cr80 42 - 9936 8265 - 8665 Structural 4-1/2" HES TNT Perm 7874 9812 7874 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0034632 , 0028307, 0028331 42 - 7975 293 565 44727 7567 977 5976 0 0 1060 298 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV 9812 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:57 pm, May 03, 2024 Digitally signed by Eric Dickerman (4002) DN: cn=Eric Dickerman (4002) Date: 2024.05.03 11:13:24 - 08'00' Eric Dickerman (4002) RBDMS JSB 051424 WCB 7-29-2024 DSR-5/6/24 ACTIVITYDATE SUMMARY 2/13/2024 CTU #9: 1.75" CT 0.156 wall. Job Scope: Mill 4.5 CIBP Mobilize & MIRU CTU 9. MU YJ 5 blade junk mill milling BHA. Bleed down IA. Secure Well for night. ...Continue on WSR 2-14-24.... 2/14/2024 CTU #9: 1.75" CT 0.156 wall. Job Scope: Mill 4.5 CIBP RIH w/YJ 2-7/8" milling BHA w/3.7" 5 blade junk mill. Mill plug @11760' CTM, loss in plug integrity after 1.5hrs milling but plug would not push south after additional 4 hrs milling. POOH to inspect mill and BHA. Decide to replace motor and PU VBS, 3.700". Secure location @ 1800. ***Continue WSR to 2/15/2024***. 2/15/2024 CTU #9: 1.75" CT 0.156 wall. Job Scope: Mill 4.5 CIBP RIH w/YJ 2-7/8" milling BHA w/3.700" Venturi Burn Shoe. Dry tag plug @ 11,776CTM. Plug started pushing south after 1 min of milling. Push plug down to 13708' CTM. POOH. Pump 5/8" circ sub ball, lay in diesel from 10,750'. L/D YJ milling BHA. 5/8" Ball Recovered. RDMO ***Job Completed*** 3/4/2024 *** WELL FLOWING ON ARRIVAL *** RIH WIH 20' X 3.70 WHIPSTOCK DMY DRIFT, CLEAN RUN TO 10,350' SLM, POOH *** WELL S/I ON DEPARTURE, DSO NOTIFIED *** 3/25/2024 T/I/O = 950/740/20. Temp = 106°. Bleed IAP (eval TxIA). No AL. IA FL @ 3780' (sta # 4 dome). Bled IAP slowly to 200 psi in 1.5 hrs. OAP decreased 10 psi. Monitored for 30 min. WHPs & IA FL unchanged. Final WHPs = 950/200/10. SV = C. WV, SSV, MV = O. IA, OA = OTG. 23:00 4/4/2024 *** WELL FLOWING ON ARRIVAL *** (SET PATCH) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH RIH CH/CCL/BAKER #10 SETTING TOOL/3.68'' NS ONE TRIP PATCH WITH BAKER SLIDING SLEEVE TO SET AT 10284.3' MD CCL TO MID ELEMENT = 11' ,CCL STOP DEPTH 10273.3' MD, BOTTOM ELEMENT SET AT 10302' TOP OF PATCH AT 10281', BOTTOM OF PATCH AT 10307', MIN ID = 2.31", SLIDING SLEEVE CLOSED CCL CORRELATE TO HES PERFORATING RECORD DATED 18-JUN-22 JOB COMPLETE RDMO YELLOWJACKET ELINE ***WELL S/I ON DEPARTURE*** 4/6/2024 ***WELL S/I ON ARRIVAL*** RAN 3.75" SWAGE TO XN @ 9,918' MD (fluid level 4,700') LRS LOADED TBG w/ 70 bbls CRUDE SHIFTED 2-7/8" CMD OPEN IN STRADDLE PATCH @ 10,281' MD SET 2-7/8" ORIFICE INSERT w/ 2 x 0.188" PORTS IN X-NIP IN CMD RAN 2-7/8" CHECK SET & CONFIRMED SET ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU 18-02C Dry tag plug @gygg@ 11,776CTM. Plug started pushing south after 1 min of milling. Push plug down tog 13708' CTM. POOH TOP OF PATCH AT 10281', BOTTOM OF PATCH AT 10307', Daily Report of Well Operations PBU 18-02C 4/6/2024 T/I/O = 1328/392/0 (PROFILE MODIFICATION) Assist Slickline Pumped 2 bbls of 60/40 & 58 bbls of crude down flowline for a freeze protect. Pumped 70 bbls of crude down TBG to load for S/L. Pumped 0.7 bbls fo crude down TBG while S/L moved sleeve. DSO notified upon departure. FWHP = 828/398/0 Milled CIBP fish and patch are correctly shown on the new WBS, below. -WCB David Douglas Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 09/02/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20220902 Well API #PTD #Log Date Log Company Log Type Notes AOGCC Eset # END 3-11 50029218480000 188087 8/1/2022 Halliburton CALIPER + Report KALOTSA 4 50133206650000 217063 7/18/2022 Halliburton PPROF + Processing KBU 22-06Y 50133206500000 215044 7/14/2022 Halliburton PPROF + Processing KTU 24-06H 50133204900000 199073 7/21/2022 Halliburton PPROF + Processing KU 24-05B 50133206830000 219072 7/20/2022 Halliburton PPROF + Processing MPU C-24A 50029230200100 209134 7/28/2022 Halliburton COIL FLAG MPU I-17 50029232120000 204098 7/19/2022 Halliburton FREEPOINT NS-10 50029229850000 200182 7/23/2022 Halliburton CALIPER + Report NS-32 50029231790000 203158 7/24/2022 Halliburton CALIPER + Report PBU 18-02C 50029207620300 213009 7/14/2022 Halliburton CAST/CBL PBU C-10B 50029203710200 211092 7/15/2022 Halliburton PPROF + Processing PBU L5-03 50029236230000 219033 7/25/2022 Halliburton PPROF + Processing Please include current contact information if different from above. T36973 T36974 T36975 T36976 T36977 T36978 T36979 T36980 T36981 T36982 T36983 T36984 PBU 18-02C 50029207620300 213009 7/14/2022 Halliburton CAST/CBL Kayla Junke Digitally signed by Kayla Junke Date: 2022.09.07 11:00:16 -08'00' David Douglas Hilcorp North Slope Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt and return one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 02/23/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL (23-FEB-2022) Folder Contents: Log Print Files, Reports and Digital Data Files: Well API #PTD #Log Company Log Date Log Type Notes: PBU L-207 50029237020000 221081 HALLIBURTON 1/12/2022 PPROF INCLUDES ANALYSIS PBU 04-51 50029235970000 218018 BAKER 11//24/2021 RPM INCLUDES ANALYSIS PBU 09-38 50029219190000 189021 BAKER 12/1/2021 RPM INCLUDES ANALYSIS PBU 09-39 50029221330000 191012 BAKER 12/6/2021 RPM INCLUDES ANALYSIS PBU 18-02C 50029207620300 213009 BAKER 11/25/2021 RPM INCLUDES ANALYSIS PBU 18-03C 50029207760300 211066 BAKER 11/26/2021 RPM INCLUDES ANALYSIS PBU 18-05A 50029215830100 202219 BAKER 12/8/2021 RPM INCLUDES ANALYSIS PBU Z-32C 50029219240300 213127 BAKER 12/10/2021 RPM INCLUDES ANALYSIS Please include current contact information if different from above. 213-009 T36371 PBU 18-02C 50029207620300 213009 BAKER 11/25/2021 RPM INCLUDES ANALYSIS Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.02.25 08:36:20 -09'00' Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:213-009 6.50-029-20762-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13805 11800 8690 9812 12320 11800 7874 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 47 - 127 47 - 127 1490 470 Surface 2584 13-3/8" 46 - 2630 46 - 2630 5380 2670 Intermediate 2855 9-5/8" 44 - 2899 44 - 2899 6870 4760 Liner 7562 7" 2684 - 10246 2684 - 8228 7240 5410 Perforation Depth: Measured depth: 11070 - 13250 feet True vertical depth:8698 - 8665 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 42 - 9936 42 - 7975 9812 7874Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Perm Liner 3872 4-1/2" 9928 - 13800 7969 - 8616 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 47704950263 10103396 0 11416 144 287 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Dave Bjork David.Bjork@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907) 564 - 4672 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8616 Sundry Number or N/A if C.O. Exempt: 321-121 No SSSV Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0034632, ADL 0028307, ADL 0028321 PBU 18-02C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 9:59 am, Jul 06, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.07.06 08:04:08 -08'00' Bo York SFD 7/6/2021RBDMS HEW 7/8/2021 DSR-7/6/21MGR30JUL2021 ACTIVITYDATE SUMMARY 6/8/2021 CTU #9, 1.75" Coil - 33.6bbl, Job Objective: Set CIBP, Extended AddPerf MIRU CTU. Make up 3.50" JSN drift and 2.88" GR/CCL carrier, RIH. Load well with 1% KCl w/ SafeLube. Drift to 12300' and log up to 10800, painting Red tie-in flag at 11750'. POOH keeping hole full. Good data on log. Set 4-1/2" Alpha Oil Tools CIBP at 11,800. Currently POOH keeping hole full. ...Job in Progress... 6/9/2021 T/I/O=0/430/0. Temp = SI. PPPOT-T (PASS), eval TxIA com. PPPOT-T: Stung into test port (1000 psi), Bled void to 0 psi. Pressured void to 5000 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. SLB coil in control of well upon departure. 19:45 6/9/2021 CTU #9, 1.75" CT - 33.6bbl, Job Objective: CIBP, Extended Addperf Currently POOH after setting CIBP. Deploy HES 2-3/4" perforating BHA. Tie in at CIBP and perforate: 11230-11265 & 11295-11400 with HES 2.75" 6SPF Millennium. POOH and kill well. After bullhead, well still has gas breaking out and migrating up. RBIH to kill well from bottom. Confirm no flow. Begin undeploying perforating BHA. ...In Progress... 6/10/2021 CTU #9, 1.75" CT - 33.5bbl, Job Objective: Extended Addperf Finish undeploying the perforating BHA. Freeze protect well with 38bbl diesel. RDMO. ***Job Complete. Well shut in on departure.*** Daily Report of Well Operations PBU 18-02C Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:213-009 6.API Number:50-029-20762-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 034632 Property Designation (Lease Number):10. 8. PBU 18-02c 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations 5 Fracture Stimulate …Repair Well … Operations shutdown … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 13805 Effective Depth MD: 13Cr80 11. Commission Representative: 15. Suspended … Contact Name: Dave Bjork Contact Email: David.Bjork@hilcorp.com Authorized Name: Bo York Authorized Title:Operations Manager Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing …… Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Installed Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8616 Effective Depth TVD:Plugs (MD):Junk (MD): ……Other Stimulate Re-enter Susp Well Suspend …… ……Plug for Redrill 55Perforate ……Perforate New Pool 9812 / 7874 No SSSV Installed Date: Liner 3872 4-1/2"9928 - 13800 7969 - 8616 8430 7500 Well Status after proposed work: 16. Verbal Approval: … … …Change Approved Program 46 - 2630 46 - 2630 14. Estimated Date for Commencing Operations: BOP Sketch 47 - 127 Structural 6870 Proposal Summary 13. Well Class after proposed work: 4-1/2" HES TNT Perm 11070 - 13250 8698 - 8665 4-1/2" 12.6# 13Cr80 42 - 9936 Liner 12320 8676 none 12320 47 - 127 470 13-3/8" 9-5/8" Contact Phone:(907)564-4672 Date: 4760 80 149020"Conductor 2670 …GINJ 5 Post Initial Injection MIT Req'd? Yes No … 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Surface 2584 5380 Intermediate 2855 44 - 2899 44 - 2899 7562 7"2684 - 10246 2684 - 8228 7240 5410 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … 2470 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. CTU extended perforating 4-5-2021 3-10-2021 By Samantha Carlisle at 1:26 pm, Mar 10, 2021 321-121 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.03.10 12:31:05 -09'00' Bo York 10-404 0 DLB03/10/2021 2470 ; ADL0028307; ADL0028321 DLB MGR11MAR21 DSR-3/10/21 XYes…on Required? Comm 3/11/21 dts 3/11/2021 RBDMS HEW 3/12/2021 Add Perf Procedure 18-02c PTD: 2130090 Well Name: 18-02c Add Perf API Number: 50-029-20762-03 Current Status: Shut in Rig: CTU Estimated Start Date: Estimated Duration: 2 days Regulatory Contact: Carrie Janowski Permit to Drill Number: 2140520 First Call Engineer: David Bjork (907) 440-0331 (c) Second Call Engineer: AFE Number: IOR 40 Current Bottom Hole Pressure: 3,343 psi @ 8,800’ TVD 7.4 PPGE | Maximum Expected BHP: 3350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure: 2470psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP: 510 psi (Taken on 11/25/2019 DHD) Min ID: 3.725” ID – XN profile @ 9,918’MD Max Angle: 98 Deg @ 13,519’ Reference Log: PDS GR-CCL - Log Dated 18-Aug-2015 Brief Well Summary: 02-09c is rotary sidetrack completed in Z1A in Sept 2013. Objective: The objective of this procedure is to isolate the water production from the toe perfs and shoot the remaining 140ft of Z1A marginal rock quality between existing perfs. Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perfs guns. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. Bullhead 170 bbls of KWF, 8.4 ppg 1% KCl or 8.5 ppg down the tubing to the formation. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 170 bbls b. 4-1/2” Tubing - 11070’ X .0152bpf = 168 bbls 3. MU and RIH with logging tools and drift BHA to resemble 2” dmy gun. Run past 11800’ctmd and log OOH. 4. POOH and confirm good data. 5. Set CIBP at 11,800ft MD. 6. Freeze protect tubing as needed. 7. At surface, prepare for deployment of TCP guns. 8. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/ KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 4-5-2021 -00 * DLB Tools deployed with PCE. Add Perf Procedure 18-02c PTD: 2130090 9. Pickup safety joint and TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 10. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per schedule below. 18-02c Addperf Schedule *HES 2” maxforce guns were used to estimate for this job. If unavailable, use another vendor as needed. Perf Interval Perf Interval Perf Length Gun Length Weight of Gun (lbs) 11230-11265 11295-11400 140 170 952lbs (5.6ppf) 11. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. POOH. a. Note any tubing pressure change in WSR. 12. POOH. Stop at surface to reconfirm well dead and hole full. 13. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 14. RDMO CTU. 15. RTP or FP well. Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Mini Log 7. Tie In Log/Perf Sheet Make up lubricator. See not above regarding kill methods if pressure observed at surface after perforating. Standing orders flow chart included with this sundry request. * Add Perf Procedure 18-02c PTD: 2130090 Current Wellbore Schematic Add Perf Procedure 18-02c PTD: 2130090 Proposed Schematic CIBP 11,800 Add Perf Procedure 18-02c PTD: 2130090 Coiled Tubing BOPs Add Perf Procedure 18-02c PTD: 2130090 Equipment Layout Diagram Add Perf Procedure 18-02c PTD: 2130090 Standing Orders for Open Hole Well Control during Perf Gun Deployment Add Perf Procedure 18-02c PTD: 2130090 18-02c Producer PE Comments Add Perf Procedure 18-02c PTD: 2130090 18-02c Tie-In Log Add Perf Procedure 18-02c PTD: 2130090 Add Perf Procedure 18-02c PTD: 2130090 Add Perf Procedure 18-02c PTD: 2130090 0— � • . a n F- > �' OO a N (4 O 1 11:( i a L a-+ Wrw oA oH t N 0 O CV ONz 0 I- ;° o o E v O00 � ZEC' ,— — ,— N ,— — 4" N CO ✓ O vi a O za C C 4- O H Y U 0.: a C >, ✓ I� <4 _Y F.. 0 ro O -p a = u O: O ? < Q W. u C ❑ J r- N N N N p 6 CO Q r ` E Y L "a ° to Q O c a a to as to a -o `, �, -i M LL U. 22 E Ea + C S L c N H.. O) N 0 00 O 06 OC fC a a 0 Z Q.` M N N N NCI ,- to u ° U Z Q a > " \O a a c z O C � i- (cc iYo N -p ( 0 4' W 0 cn ❑ ❑ ❑ ❑ ❑ ❑ 0 C w p 0 a W W W W W W W W W ., ai' U "�' F.: LL LL LL LL LL LL LL LL LL o Q J J J J J J J J Ja > C CD t4.) ►- Q Q Q Q Q Q Q Q Q v `n .L = < Z Z Z Z Z Z Z Z Z a L a ° a 0-) �. LL LL LL LL LL LL LL LL LL CC > _.....,..,. > O , y a Q vU E a a u a V c0444 4 > 1_ > ul) a Z O V ca > tO Qa a Ca CO _ = U: M yR H I- i_ > CO LIJ L. o in cc Z ii. > U U % Gi G aWo O -a ~ U O 0O W -i aa)) 'b 0 G 4.4 mcn2aa � m m3 a) 44) 2 U a. m = a s E v v U 00 to > 0 ,.V WU > c' 0 4-4 0 b m 'S d 1 (a3 Ix W ° >, > i 6:1 ,�L "j U F�.. O O J O O '''' CI:h ---zi to 00 R EEEE i*t: W: 41 W Q Q Q Q Q Q >-} 5 m CO CO CO m CO F- Y c:CZWILIWW111 WZD Z .20000005 ® ❑ 2 2 S 2 2 m E Q -IO ❑ ❑ ❑ ❑ ❑ ❑ a - e W M O M > O = Z �/1 vrececcwecce — a a a a a a o c c V 7o co cc x n p O M 'R W 44 N 00 N N tf) N N in 01 LU co V 0 0 0 0 2 t"' 0 0 0 O N 0 0 0 0 0 0 0 0 £ ° c o 0 0 0 0 0 0 0 CL. 0U ❑ N ❑ SM Q N N O 0, a) N a LU Qazr >cc p Y O U+ . Y Y c5 t00000100 Doc) 00 CC M vi 0. m O r O u M O O O O O N 111111 . 11 4,al C O O O O O O O O O Q N N . 00 0 N M CO44 l co t0 (0 lC CO 0 00 (O (0 4.4 �j Im 00 N Cr N M M M (O M ,- 0 M M N ,- N N "c i-3 NNNNNN NNN IAC �. l'A /A N do O O do ch Q) C O O NNNNNN NNN .)1Q1 0 0 0 0 0 0 0 0 0 C c. 4� C t() Uto to) in (f) Nin In Q -0 m co cE til Iiin S cv y LU .) 01 E a Oa O lI) V 44 0 a' AZt 1- `d � l ' O Q U N O O03 N a C N a) E _ ++ oo 0 Z ry M 0 t0 O N '- N ,- a+ E a u cc !R+ ^ N Ct a Q N �., J co IV > r a Y E Z a) 'O u Zt... CI. n7 al @ a 0 CO3 O. a . I- a` a CO STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 6-C (A kP 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number:. 213-009 'VD---' 3. Address: P.O.Box 196612 Anchorage, Development l Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: • 50-029-20762-03-00 7. Pro'perty Designat V.ea 0r;1m.�ai ADL 0034632^^�00 2.1 8. Well Name and Number: , PBU 18-02C Nirr 9. Logs( /(List logs and submit electronic 3and printed data per 20AAC25.071):710. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: , '-2 . , Total Depth: measured • 13805 feet Plugs measured 12320 feet true vertical , 8616 feet Junkc ':'1' measured feet r~ Effective Depth: measured 12320 feet Packer measured 9941 feet true vertical 8676 feet Packer true vertical 7979 feet >6 i :_ , Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 47-127 47-127 1490 470 Surface 2584 13-3/8"72#L-80 46-2630 46-2630 4930 2670 Intermediate Production 2855 9-5/8"47#L-80 44-2899 44-2899 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 11070 11230 feet 11400-11670 feet 11910-12240 feet 12550-13250 feet True vertical depth: 8698-8694 feet 8691-8691 feet 8685-8678 feet 8666-8665 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 42-9937 42-7976 Packers and SSSV(type,measured and 5"Baker ZXP Top Packer 9941 7979 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: CON DE(.1 , 4 203 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 1345 45842 50 1140 1263 Subsequent to operation: 1285 37380 50 1500 1260 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development F 1 . Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL ❑ - Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Z(1, 2. Com✓ Phone +1 907 564 4424 Date cl//4)/5 Form 10-404 Revised 5/2015 V rL 41`15//5 il //5- RBDMS VP 15 2015 Submit Original Only • • Q 0 0 0 0 0 0 cO l- ON- r00 v LO In 0 N `Zr U) N- N- C.) o 0 o D o 0 i C) co I— t M M V' CA 00 N V V CO V 0 I� CO CO O 0) CO CD CD CO 0' N- C O 00 N CO 0) N N CO CO N- O H LO 0 f� O CO N V V CD N 0) v I. OM 0) NI- O CJ (0C)co L N N C) V a 4-,• U N Q O r- CO Nt co N N _ 'Cr V NI- N 0 O O LL co 00co U U = J J CO co N J *k *k • Nto N- N �$ CO CO 00 N N N- O r NN COV L_ O 0�0 t.x) (NO (NI C) C 00 to 00 Lf) 00 00 J N N N- co C1) Z • O .y• OVO Q OuO (YEtZ Z c O w w m ODfxZZD OU) aJJi- . . . . . . _ . • . • k q co e . ± 0 \ ? / u) Io 77 - \ E o CD- 0 U_5 k $ � / O , \ .\ _ G 2 i \ co \ O o I o o }7 \ D I 3 .(13 a 0 � o0 » o * 9 _A CO co <IP fX 0 ? .c E \ � 7 a) f / [ \ - � � i2 � k 7 09 .7f CO2k ± cm w _ � \ o- p\ G ' U o w E ƒ & O p � / E \ _ / R O. a) IDr 010_ \ co ± o cl , . % ® � k2 - $ / r k \ \ a) $ 0 O - : I- m > f o a H /DD / Ro$ 0k / / / 2 � P / / ( $ \ \ % » , & oe » = 6 ® .c @ w / § / E $ 0 \ a / \ / \ aiROE 2 > Ut_ 32 / 2E - D c 1 \ J .% 2 7 © H - - O - R .c 2 ID .o 0 0 2 » I ; 0 0 ± m % \ 7 Lu I- < in in I- d / t 5 c $ co (1) 0 < IF 32i= CNV WIEU_HEAD= MCEVOY' SATY NOTES: WELL ANGLE>700 @ 10944. 'ACTUATOR= BAKER C 1 El-C)2 C ... PREVIOUS WELLBORES NOT SHOWN OKB.B_EV= 46. 4-1/2-CHROME TBG 8. LNR. _ E3F.E3.E1/= Kap= 3100' Max-Kritile= 98"a::, 13519' 20.CCiNCUCT°R. — -8° j 1 I • i 2013' 1—4-1/2"FES X NAP,ID=3.813' lia-bsn NO= N/A 91.5#H-40. Datum TVD= 8800'SS ID=19-124" 13-3/8"CSG,72#,LBO BT&C,13=12.34r — 2614' GAS UFT MA NCRB_S ST fiC/ TVD DEV TY PE VLV LATCH PORT DATE ' 9-5/8.X 7"HES VERSA FLEX LTP w/LNR HGR, '— 2684 - ILI i 4 3780 3767 19 KGB2 DMY BK 0 05/05/14 0=5.890 3 6836 5837 52 KGB2 DMY BK 0 05/05/14 2 8730 7015 47 KGB2 MY BK 0 09/21/13 9-5/8"CSG,47#,L-80,ID=8.681" — -2899 1 9711 7792 35 KGB2 DMY BK 0 09/21/13 9-5/8'WHIPSTOCK(08/03/13) — 2899' 9-5J8"MILLOUT VVINDOW(18-02C) 2899'-2916' 7 , Minimum ID = 3.725" © 9917' 4-1/2" HES XN NIPPLE .7X X 7"LM,26#,L-80 HYD 563 XO L-80 VAM TOP FiC —1 5209' I I 9783' X 9812' —7"X 4-1/2"TNT PKR,ID=3.856' I I 9846' —4-1/2'ICS X NIP,0=1813" I I 9918' —4-1/2'FES XN 11P,D=1725' TOP OF 4-1/2"LINFt I— 9928' 9928' —7'X 5"HRD-E ZXP LTP w/TIEBACK SLV, I:I=5.25' 4-1/2'TBG, 12.6#,i3cR-85 VAM TOP, — 9936' / N .0152 bpf,0=3.958' p.:4 9936' 1_41/2 VVLEG,ID=3.958' TCC — 9951' "'''' ------- 9951' —7"X 5'BKR FLEXLOCK LNR HGR,0=4.320" • • 41., 7"LNR,26#,L-80 V AM TOPHC, — 10246' IF 9961' —5"X 4-1/2"X0,ID=1920" • .0383 bpf,13 6..276" • ..,,, • • F x'I PERFORATION SUMMARY • REF LOG:PER TAGGIVG ON FLOAT COLLAR @ 13714' • :.'1(,.. 1127r —RA TAG-RJP D(SET MID JONT) ANGLE AT TOP PERF: SC@ 11070' * X' (MID EL EM: 11276) Note:Refer to Production C13 for historical pert data • .i. SIZE SW INTERVAL OpNSqz SI-OT SQZ • . 11281' —RA TAG-RP C(SET MD JONI") ' 2-7/8" 6 11070- 11230 0 09/23/13 • (MID B_EM ENT @ 11286) 2-7/8' 6 11400- 11670 0 09/23/13 -.0.- do, 12320' —4-1/2'VVFD VVRP(08119/15) 2-7/8" 6 11910- 12240 0 09/23/13 : • 2-7/8' 6 12550- 13250 C 09/23/13 12783' -RA TAG-RP B(SET mu Jorro ,1,- • MID ELBA ENT @ 12787' • . : • • 12793' —RA TAG-RPA(SET MCI JONT) MID 13714' .1 MID ELEMENT @ 12797' • to fe ev efr 1 4-1/2"LNR, 12.64,13-CR VA M TOP, 13800' v e ) .0152 bpf,t)=3.958" . . DATE REV BY C0k9AgNITS DATE REV BY CONVENTS FRUCHDE BAY (NT 08/04/82 MI 176 IMTIAL COMPLETION 10/10/13 TK/JMD FINAL ODE APPROVAL WELL 18-02C 04/10/95 ICES SIDETRACK(18-02A) 10/11/13 DJS/JIAD GLV 00(10/05/13) PERMT No. 2130090 09/18/03 AS/WLP RENAME 18-025 TO 18-02A 05/08/14 TBD/JM) GLV C/O(05/05/14) AR Isio: 50-029-20762-03 08/19/09 NORDIC 1 CTD SIDETRACK(18-02B) 09/01/15 BLS/JMY SET WRP(08/19/15) SEC 24,T11N,R14E, 1300'FM_&131'Fa 09/27/13 PKR 272 SIDETRACK(18-02C) 10/10/13 PJC/JM) DRG DRAFT CORRECTIONS BP Exploration(Alaska)