Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-018 STATE OF ALASKA RECEIVED 0LASKA OIL AND GAS CONSERVATION COMMIS. REPORT OF SUNDRY WELL OPERATIONS NOV 0 6 2017 1. Operations Performed Abandon 0 Plug Perforations E Fracture Stimulate 0 Pull Tubing 0 Opera s shutdw0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Chang% o m 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Set CIBP Id 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 213-018 3. Address: P.O.Box 196612 Anchorage, Development Id Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22172-02-00 • 7. Property Designation(Lease Number): ADL 0028326 8. Well Name and Number: PBU 05-35B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12259 feet Plugs measured 11590 feet true vertical 8920 feet Junk measured feet Effective Depth: measured 11590 feet Packer measured 9402 feet true vertical 8927 feet Packer true vertical 8119 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20"91.5#H-40 32-110 32-110 1490 470 Surface 3831 9-5/8"36#J-55 31 -3862 31-3761 3520 2020 Intermediate 9637 7"26#L-80 29-9666 29-8327 7240 5410 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10870-11100 feet 11270-11330 feet 11790-12230 feet True vertical depth: 8927-8926 feet feet 8927-8925 feet 8921-8920 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 27-9521 27-8211 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED JAN 0 3 z U1 13. Representative Daily Average Production or Injection Data I Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 550 45742 0 520 1000 Subsequent to operation: 426 11194 0 1040 887 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development Z Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Id Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Oestgaard,Finn Contact Name: Oestgaard,Finn Authorized Title: Production sneer Challe r Contact Email: Finn.Oestgaard@bp.com Authorized Signature: 4 - Date: 4/l (7 Contact Phone: +1 907 564 5026 VII, i 2 /1-1/ :-�ti V°f Form 10-404 Revised 04/2017 1,...27*1,...27* uS [,� - 7 2617 Submit Original Only • • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary November 1, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Cast Iron Bridge Plug in Well 05-35B, PTD # 213-018. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • Q(=, 0 o O o 0 Ry r N O N U (4 0)0N CD QS N COOCO 7 �t CO N V CO m C) CO P co P 00 OLO N LU O r- CO N 00 CO N N CO CO CO 0) 0) N CO 00 CO CO CO CO CO H CO CO N Cf) N - o) O CO CO N CO C) N N N- 00 0) N 00 Cb 00 CO CO 1- 0) Cf) O N CO CO N O CO r O 6 V V O N N co 0) O O �- N 0) r U p 03 _, 2 I I II , i I I 4.0 Ln CO N- 0) M N rny_ rNor co co N CO NO N c a m a LU O O O CO CO 00 OD O J I J -) 00 J J J N N J N N • (n r C) c r (A CO CO UPO\O N N N 00 CV O CO I� ti N O) co co N d• t _ Cr)CO CO ) 7 O N 0 V 0) a) co co O N _.! W U W W U 0 w c c c Z Z Q W W W W W m 0 D H Z Z Z Z_ J U Cn Z J J J • • Packers and SSV's Attachment PBU 05-35B SW Name Type MD TVD Depscription 05-35B TBG PACKER 9402.11 8118.54 4-1/2" Baker S-3 Perm Packer 05-35B PACKER 9522.11 8212.13 5" Baker ZXP Top Packer • • m \ \ - / % o/ a \ $ \ ° \ E ®/ / \ \N @ o f / @ o ,- ® o _/ p/ \ \ % o01 E _ & m .g \ a _0 $ 6 0 7& f a mg00 = 4 7 ° § _ \ a) Roo _ aI o \\ \ \ _ / m = % 0 •- Q)O / 1 0- CT) o £ \ R = » 0 0aO2e0@ $ a 2a_ _ H ^ E 2 c o j % » o x ° y g ± a f m C § ® 0 8 E IP• < / / \ \ /_ 3 0 f G E_ e w » ¥ O - \ \ \ m \ / e CI* > & ) a 2 \ n e 0 & o \ I- O CO / ƒ » 0 ©_027 / » \ u \ 0 LO 0 \ / e = eco- + 2 0 2 Ra 0N - P_c / 0 LU + & U) /in § [ p 2 � � rbc -LL / \ \ a - 06 - \ - k D t I_ § Ce b I \ \ \ ƒ E ƒ 5 �_ o > 0 -Ci) b \ Eof \ \ \0 a) k m ® s \ $ / / 0 � ° 5 / a O n n o b & m N e / � \ - § .759 2af & 2 \ \ § _ o w E © 2 § . c - / g 2 u _ / c = H. 0 \ C / _ ± / -0 / » / ° / \ = c CO o R g _ \ * k a E = .2 ® ^ % E \ # O < 0 2 k 0 e ° ? / ® j E > f It 2 0 E o 2 H o o # 0 . / _ ƒ ) \ E o / \ 0 : / \ ) \ O / O > e = o # 4- m O O i O m E t \ \ L \ » » H \ \ / cp / 2 ~ to `3) (') \ \ / < TREE= CNV 10516_ S lIFA05-35B SAF NOTES:4-1/2"CHROME TBG L INITIAL@ AND" WELLBORFS ACTUATOR= BAKER C T KB.ELEV= 72' I I NOT SHOWN'"' NT BF.ELEV= / KOP= 2800' Max Angle= 93°@ 10671' 20"CONDUCTOR —1 110' ' I 2204' 1—4-1/2'HES X NP,D=3.813" Datum MD= 10429' 94.5#,H-40, Datum TVD= 8800'SS D=19.124" GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 9-5/8"WI PSTOCK(08/29/08) — 3861' En 2 3775 3690 35 KGB2 DOME BK 16 03/13/13 19-5/8"CSG,36#,J-55 BTC,D=8.921" —I -3875 < 1 6401 5739 42 KGB2 SO BK 20 03/13/13 MLLOUT WINDOW(05-35A) 3861'-3875' x 7"CSG,26#,L-80 TCII XO L-80 BTC-M —1 4212' ' - I .9371' —I—4-1/2"IES X NP,D=3.813" Minimum ID = 2.37"@ 10269' 45 KB LINER TOP PACKER Z X 9402' I—7"X 4-1/2"BKR S-3 Ft(R D=3.870" ii---I 9435' I—4-1/2"FES X NP,D=3.813" NOTE POSSIBLE DAMAGE I 1---19508' H4-1/2"IfN s XN P,MILLED TO 3.80"(02/20/11) TO LNR TOP/WL EG POST CTD M.(07'2011) / 9510' —7"X 5"l-f2 ZXP LTP w/TIEBACK SLV,D=4.460" 4-1/2"TBG, 12.6#,13CR-80 VAM TOP — 9520' \ 9520' I--4.112'WLEG,D=3.958" 0152 bpf,ID=3.958" i P 9533• —H7"X 5"BKR FMC LNR HGF D=4.450" • 9542' -- 5"X 4-1/2"XO,D=3.930' 7"CSG, 26#,L-80 BTC-M,.0383 bpf,D=6.276" —I 9676' ' , 10269' 1—45 KB LTP,ID=2.37"(06/26/13) 5.1r---------' TOP OF LNR -I 10278' A 10278' —3.70"DEPLOY SLV,D=3.00' —I 10290' I—3-1/2"PUP JOINT,ID=2.995 3-1/2"LNR 9.3#,L-80 STL, .0087 bpf,D=2.995" H 10426' [ 10426' r13-1/2"X0 TO 3-3/16",ID 2.78_1 4-12"LNR 12.6#,L-80 BT-M,.0152 bpf,D=3.958' -I -10800 4-1/2"MONOBORE WHIPSTOCK(02/03/13) -I 10485' , MILLOUT WINDOW(05-358) 10485'- 10494' L3-1/4"LNR 6.6#,L-80 TCI,.0079 bpf,D=2.850" —I 11008' `\ PERFORATION SUM VARY L 11008' —3-3/16'X 2-7/8', =2.377" D REF LOG:S.M ADEM LEE GR/CCL ON 02/10/13 ANGLE AT TOP OF PERF: 90"@ 10870' Note:Refer to Production DB for historical per data SIZE SIZE INTERVAL Opn/Sqz Shot SOZ 11590'CTM —2-7/8"CEP(07/17/17) 2" 6 10870- 11100 0 02/12/13 2" 6 11270- 11330 0 02/12/13 2" 6 11790- 12230 C 02/12/13 I PBTD - 12240' 2-7/8"LNR 6.4#, L-80 STL.0058 bpf,D J {=2.441" -I 12255' --max DATE REV BY COMMENTS DATE REV BY CIDIAMENTS P RUDHOE BAY Lt'IT 07119/91 E91 N2E5 IMTIAL COMPLETION 06/28/13 TJWJMD SET 45 KB LIP(06/26/13) WELL: 05-35B 09114108 NIES SIDETRACK(05-35A) 10/13/13 AB/PJC FNAL ODE AIW)VAL PERMIT NO: 2121940 07/18/11 NORDIC 2 CTD MULT1-LAT(05-35AL1) 07/18/17 AB/JMD SET Ci3P(07/17/17) API No: 50-029-22172-02 02/14/13 NORDIC 1 CTD SIDETRACK(05-358) SEC 32,T11 N,R15E,2323 FM.&124'Mk 02/15/13 PJC DRG HO CORRECTIONS - _ _ 03/22/13 LEC/JM) GLV GO(03/13/13) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. cQ13 - 01 8" weu History File Identifier Organizing (done) ❑ Two-sided III 1 III Iliii ❑ Rescan Needed III 1111111111 111111 RES N DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: reyscale Items: ❑ Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: • BY: diallki Date: ca ,a7// /s/ Project Proofing II ( BY: OM Date: a /s/ 1 Scanning Preparation i.Z x 30 = 110 0 + 3 = TOTAL PAGES 6 3 (Count does not include cover sheet) BY: Maria Date: 0.1, 7/Iii. /s/ Production Scanning 11 IIIIIIIIIIIIIIII Stage 1 Page Count from Scanned File: (7 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: I7YES NO BY: Date:a'a7 ` L. . /s, IA F Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: Is/ Scanning is complete at this point unless rescanning is required. 1111111111111111111 ReScanned 111111111111111H BY: Maria Date: /s/ Comments about this file: Quality Checked Hill III III III 0 r M N N el N ! CO OI OI 01 W_ W_ W_ N Ili LL J J J LLI El El N CO N Z C W 01 E (L ii Q Q Q = N W W I j I Z Z Z w O_ co J I- 75 Q Q Q ti (i (i Q 9 > }I co o . O CO Z Z Z v)I co v)I m 0 f° E a a I� E LL co u) co -o O- w a) °� 01 01 01 0 0 0 c Z Z > o o E 01 MI MI MI I I I ET. �_ j ,a`; c y o 0 0 0 0 0 Q N y O O W N N N N N N C 03 + LL W W W W W W O r N C I co LL u_ LL (i J ` o CO a 5 @ �< 00 00 00 00 0o,a 00 V Oi O O C 0 0 U N (_.Z _N 01 N 01 N 01 N y1 _N N1 E _N 01 Z a) a a a^ 0 0u1a u-0 Li- LLcc LL IY E LLC E LLCC4- (0 d E a) a) 0 0 o0- O I c? I E 0 1 0 I 0 1 rn 0 I-0 3 w E o o E Z` 'E _ 'cC cc c� cCL co 'cCe O 'c<Y Q- M m o V c c CD O o 2 Jiml P 01 E E 01 E E 01v 2 01= P 01S 2 OI= J (4 J 'm m 0(0j a) Nm� Nm V Nm o Nm o' N�ml Nmml Nmml ce a EO 2 2 20 2 WMO WM= WM2 well WMO WMO WMO O 2 O 0 C 'am M M M M M M M M co M Y > 0 0 0 0 O O 0 0 0 O O W g CO ISNNN NN N N N N N N to to Lo Lo Lo Et d M M M CO aD CO W W W CO CO li X rr C C C C W W J 2 S a a) O m 000 0 0 0 Z 8 0 O LC) LO CD Q _ .2 CL N N N N N a) c Ca N J a) it CL m 0 m C ': ZI C t N O O . C r. o a� N 0 M M CO G C y Cl) 0) 0) 0) O N E a)tC E a. ✓ N C o J N 7 o -- Ce Z a Q C? O II co'Es 75 75 J L 0 0 /�/� CD TS W W (� 0 J U) N N O a) 0 o rj a cI d 0 i w cc a) o a ZI IY Q Z_ o /O Q d 0 o) D (1) aTi 0 E J CO g > > Z g ' m as as m as m as o c c O c Elc c g 0 0 0 0 co CO 0 � N O E o o a) m rn rn rn rn rn a a rn O O 0 0 0 0 in 0 0 in 0 0 0 2 O .m co 10 J a v v (o (o o (o m o o P .. o (n LOU) 10 U) U) U) U) to CO co M a Z L C d a a N N M M M Co M M M N 12 O 0 r Ti o z N N N N N N N N N 0 I o Ca �+Ce a) z o o '�LL ', � rn� o /N W 10 y c 0 o Q 0 ce 1 Z W C 2 0 0 0 0 0 0 0 0 U E 5 a 0 J `y 0 W a c. =y Ena c. 0 a o 0 0 0 0 0 0 a 0 a re 0 I- Joy w J J W w w w w w w o o o N I N Z/Z O N Z JO w OJ > > >CI • a, 0 so a co O O 0 N O fa O C _ C 0 CO I Z �' a Z a o 11 z iD > D t o (3 11 a i>- 0 u) > 0 a ill Q m CO CO m N N QO W M LO LO M W U U J kk \ J O 0 0 O '1 U 0 0 O 6 0 y ? co I cc U ° a IX d Z /Z cn k-O 0 0 00 O E , >- - >- I R N J •M W a) a) M W U «�/ °j O • ici Ce < C IN2 W W N2 O N O V M M a y a co I O O EN 'UO O I I W N (/) Z - O I LI a it E W IX p� N a) (c) CO p E ° E 1 Z m 0 ui U Ce Q 6. N 0 Op- C IC O O • Ja) = i v E w 1 . CL 0 N , c 0 0 el .G o O to co N a E /Z c w J 03 > > > E N N In Q M / O / O c0 v> tii U a o a E • M _ N _o I N 10 = I I c 11 M +' C N E LY CO N C O E II W 2 o :` (n O cu V/ Q a N C C p o 'CZ cc c Q o •L 0 1 E Z E m IN-711 0 15 U fca c b a t6 U U d 1 N as N c+) co j N 0 0 f0 C Q I'I N �,,I • = o «o I O Z H I' !11 • O :t. p) 'p) O I Ca o J 0 0 J E 0 / > , N 0 W o I 1 a3 o I CD co co C ' co 0 M M M M M W E a O a) N N N N N W O t t N N a a7 re O C S6 > CC •� IN la O Q „ N U 0 w C a) EN in z P C I z C co O 1/1 V O a7 Q O CO Q O D i+ C C U E U U 0 I O a v' O a Ci a 1. E I E 8 d 0 ' 0 0 0 0 l y LL o 2 a) 1 0 o a> d I I 0 0 Q a m W W 3 ? 0 a 0 O 0 w' o I', O O "/ata/2013D �' �F ". r. F.. r:7 t , ��:;n �- M K BENDER NZ`ll PRINT DISTRIBUTION LISt° 5 2°13 BAKER HUGHES O C COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME 20 WELLS RUN NUMBER 2.' '' o Or (mandatory) '2— FIELD Prudhoe Bay BH SALESMAN Jesse Salyer (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 7/30/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration (Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FINAL (dig'DI/ ADDRESS(FEDEXWILL NOT DELIVER TO P.O.BOX) OGS LOGS image) FILM PERSON ATTENTION LFIELD PRINTS #01- I'RIN I S #OF COPIES #OF COPIES 4 4 . . 4 4 1 BP Exploration(Alaska)Inc. I 3 Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I I I 1 I I I Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska 1 1 1 I 1 I I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I I 1 1 1 1 I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I f I 1 I I I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: #REF! #REF! #REF! #REF! #REF! #REF! RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION JUL 19 2013 REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U AOGCC Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time ExtensionD Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development Q • Exploratory ❑ 213-018-0 • 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-22172-02-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028326 PBU 05-35B 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured 12259 feet • Plugs measured None feet true vertical 8920.15 feet Junk measured None feet Effective Depth measured 12240 feet Packer measured See Attachment feet true vertical 8920.11 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 88 20"94#H-40 27-115 27-115 1530 520 Surface 3832 9-5/8"36#J-55 29-3861 29-3760.06 3520 2020 Intermediate None None None None None None Production 9650 7"26#L-80 26-9676 26-8334.58 7240 5410 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10870-11100 feet 11270-11330 feet 11790-12230 feet True Vertical depth 8926.55-8926.18 feet 8926.81 -8925.49 feet 8921.09-8920.09 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 26-9520 26-8210.48 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 883 35638 0 0 1016 Subsequent to operation: 885 31898 0 0 1110 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil 0 , Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCJ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerha s• BP.com Printed Name Nita Summerha . Title Petrotechnical Data Technician Sign- ‘42; / �j - Phone 564-4035 Date 7/19/2013 bV 1/F aRBr MS JUL 2 3 2093 13> )13 1 Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0028326 T/I/0=2430/1230/0 SI Assist SL with Load and Test Pumped 2 bbls meth followed by 6/26/2013 155 bbls crude down TBG to load. SL set LTP. ***Job continued on 6-27-13 WSR*** ***WELL FLOWING ON ARRIVAL*** (profile-mod) DRIFTED W/2.45" CENT, S.BAILER TO DEVIATION © 10,584' SLM (no sample) DRIFTED W/ 10' x 3.70" DMY WHIPSTOCK, 3.50" LIB & TAGGED TOP OF 3.70" DEP SLEEVE @ 10,276'SLM (10,278' MD) OBTAINED CLEAN IMPRESSION OF TOP OF DEP SLEEVE LRS HAS PUMPED 155 BBLS OF CRUDE DOWN TBG 6/26/2013 ***CONT ON 06/27/13 WSR*** ***Job continued from 6-26-13 WSR*** MITT 1500 psi ***PASSED*** Pumped 3.1 bbls crude down TBG to achieve test pressure of 1500 psi. 15 min loss of 92 psi, 30 min loss of 43 psi, for a total loss of 135 psi in 30 min. SL pulled plug and equalized TBG 6/27/2013 pressure. SL on well upon departure. CVs OTG FWHP=150/1200/0 ***CONT FROM 06/26/13 WSR***(profile-mod) SET 45 KB LINER TOP PACKER © 10,282' SLM (10,278' MD) SET LTTP (packing od 2.81") INSIDE LTP @ 10,268' SLM (10,278' MD) LRS PERFORMS PASSING MIT-T TO 1500 psi RAN PDS 24-ARM CALIPER FROM 10,450' SLM TO 10,000' SLM (bad data) RAN PDS 24-ARM CALIPER FROM 10,450' SLM TO 9350' SLM (good data) 6/27/2013 ***WELL S/I ON DEPARTURE, DSO NOTIFIED*** FLUIDS PUMPED BBLS 2 METH 161.1 CRUDE 1 DIESEL 164.1 TOTAL • QOOM (0000 O N O H O N V r+ O O O O O O O M M O O N C') m O O N- C co � r CO co CO CO M CO M O cr 10 CO O O O O CO N N M CO co co CA co M N CO CO CO CO CO M CO N CO I- M N CO M N co co N co N co N CO 0) CO CO O CO L O CO N O CC) CO O •- Cr O N M CO N Lo S O O N N r r r r V N Q M O N O co N N N O O N N N = 0 r H 9 0 coa • 0 0 O 0 J 00 CO 0' L J d � *k *k *tJ *kCp N N CO [t CO • /R♦S N � " OiCOCOCOMc`i V - CV QO CV - • M N a) 4' ccou) � N0O0 � O O '- O) M O) CD J Z W .0 0 C) UC� vZwwwwo CL OZZZZck D U -.J J J J d C/) Packers and SSV's Attachment ADL0028326 SW Name Type MD TVD Depscription 05-35B PACKER 9402 8055.6 4-1/2" Baker S-3 Perm Packer 05-35B PACKER 9510 8139.78 5" Baker ZXP Top Packer TREE= CNV VVELLHEAD- FMC 05-35B SAFE?Y NOTES: WELL ANGLE>TO°@ 10516"` ACTUATOR BAKER C P.1 C DRAFT 4112"CHROME TBG"' INITIAL AND"A"VYl3LSORES IN[T KB.ELEV= 72' NOT SHOWN"" BF.ELEV= KOP= 2800' 20'CONDUCTOR, -j 110' l 2204' —4-1/2"FES X NP, I ,D=3.813" Max Angle= 93°@ 10671' I I 94.5#,H-40, Datum ND= 10429' GAS LIFT MAPDRELS Datum TV D= 8800'SS D=19.124" ST ND TVt7 DEV TYPE VLV LATCH PORT DATE 9-5/8"WHIPSTOCK(08/29/08) H 3861' J 2 3775 3690 35 KGB2 DOVE BK 16 03/13/13 1 6401 5739 42 KGB2 SO BK 20 03/13/13 9-5/8"CSG,36#,J-55 BTC,D=8.921" H —3875 MLLOUT WM)OW(05-35A) 3861'-3875' x 7"CSG,26#,L-80 TCI XO L-80 BTC-M —I 4212' ' 9371' F.4-1/2"HES X NP,D=3.813" Minimum ID= 2.37"@ 10269' 45 KB LINER TOP PACKER I 9402' --IT'X41/2"BKR S-3R<R,D=3.870' ' 9435' H 4-1/2"HES X NP,D=3.813" NOTE POSSIBLE DAMAGE I I 9508' H4-1/T I-ES XN NP,MILLED TO 3.80"(02/20/11)I TO MR TOP/VVLEG POST CID M-(07/2011) 9510' Hr X 5'HR ZXP LTP w 1TEI3ACK SLV,D=4.460' 4-1/2"TBG, 12.6#,13CR.80 VAM TOP, H 9520' I 9520' f_4-1/2"WLEG,D=3.958" 0152 bpf,D=3.958" 9533' —17"X 5"BKR FMC LI+Ft HGR D=4.450° I 9542' —I5"X 4-1/2"XO,ID=3.930" 7"CSG, 26#,L-80 BTC-M.0383 bpf,D=6.276' H 9676' I--4 10269' —I45 KB LTP,D=2.37"(06/26113) TOP OF LNR H 10278` �1 10278' H3.70"DEPLOY SLV,D=3.00" I —I 10290' —13-1/2"PUP JOINT,D=2.995 I 3-1/2"LNR 9.3#,L-80 STL,.00$7 bpf,D=2.995" H 10426' I- 10426' ---13-1/2"XO TO 3-3/16",D=2.78" I 141/2'LW,12.6#,L-80 BT-M,.0152 bpf,D=3.958' H —10800 I 4-1/2"MONOBORE WHIPSTOCK(02/03/13) —I 10485` MLLOUT WNDOW(05-358) 10485'-10494' 13-1/4'LNP,6.6#,L-80 TCI,.0079 bpf,D=2.850" H 11008' \� 11008' I—3-3/16'X 2-7/8",D=2.377" PERFORATION S1U iARY REF LOG:SLM MEM LEE GR1 CCL ON 02/10013 ANGLE AT TOP OF PI32F: 90°@ 10870 Note:Refer to Production DB for historic al per data SIZE SCE INTERVAL Opn/Sqz Shot SO)7 2" 6 10870-11100 0 02/12/13 2" 6 11270-11330 0 02/12/13 2" 6 11790-12230 0 02/12/13 PBTD —i 12240' 2-7/8"LNR 6.4#,L-80 STL.0058 bpf,D=2.441" H 12255' DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY UNIT 07/19/91 D9!N2ES INITIAL COMPLETION 03/22/13 LEC/JMD GLV C1O(03/13/13) WELL: 05-35B 09114!08 N7ES SIDETRACK(05-35A) 06/28/13 TJWJMD SET 45 KB LTP(06/26/13) PERMIT NO: 2121940 07/18/11 NORDIC 2 CTD M ULTI-LAT(05-35AL1) AR No: 50-029-22172-02 02/14/13 NORDIC 1 CTD SIDETRACK(05-35B) SEC 32,T11N,R15E,2323 FN..8 124'FWL 02/15/13 PJC DRL.G HO CONS BP Exploration(Alaska) McMains, Stephen E (DOA) From: Lastufka, Joseph N [Joseph.Lastufka @bp.com] Sent: Wednesday, March 27, 2013 8:37 AM To: McMains, Stephen E (DOA) Cc: Ramos, Tania ((Udelhoven Oilfield System Services (UOSS)) Subject: PBU 05-35B/PTD#213-018 Hi Steve, Please reference the following well: Well Name: PBU 05-35B Permit#: 213-018 API #: 50-029-22172-02-00 Date of Test: 3/18/2013 Type of Test: IPT (Initial Production Test) Choke Size: 128 Choke Unit: 64ths Production Method: Flowing Duration (Hours Tested): 8 Top Reference (Top Perf MD): 10870' Bottom Reference (Bottom Perf MD): 12230' Tubing Flowing (Pressure): 990 Casing Pressure: 1060 Total Test(Rate f/0, W, G): 679/4/ 10138 24-Hour Rate (0, W, G): 2036/ 12/30415 Gravity (Oil, API): 30.4 GOR (Gas-Oil Ratio): 14939 This well began Production on Method of Operations on this date: 3/17/2013 F RBL)MS MAR 2'7 2013 CI HLULiVLii MAR 12 2013 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ®Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended lb. Well Class 20AAC 25.105 20AAC 25.110 ❑Exploratory ❑Stratigraphic ❑GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ®Development ❑Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 2/13/2013 213-018 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 2/4/2013 50-029-22172-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 2/8/2013 PBU 05-35B 2323'FNL, 124' FWL, Sec.32,T11 N, R15E, UM 8. KB(ft above MSL): 62 85' 15.Field/Pool(s) Top of Productive Horizon: 1202'FNL,4321' FEL, Sec.31,T11 N, R15E, UM GL(ft above MSL): 34.2' Prudhoe Bay/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD) 380' FNL,673'FEL, Sec. 36 T11 N, R14E, UM 12240' 8920' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 697190 y- 5949122 Zone- ASP4 12259' 8920' ADL 028326&028308 TPI: x- 692713 y- 5950128 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 691342 y- 5950915 Zone- ASP4 None 18. Directional Surve : 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): Y ®Yes ❑No N/A ft MSL 1900' (Approx.) (Submit electronic and printed information per 20 AAC 25.050) ( PP ) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/MCNL 10485' 8885' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 20" 94.5# H-40 Surface 115' Surface 115' 30" 11 cu yds Coldset 9-5/8" 36# J-55 Surface 3861' Surface 3760' 12-1/4" 1141 sx CS III,300 sx'G';Top Job: 195 sx CS II 7" 26# L-80 Surface 9676' Surface 8335' 8-1/2" 218 sx LiteCrete, 168 sx Class'G' 4-1/2" 12.6# L-80 9510' 10485' 8203' 8885' 6-1/8" 423 sx Class'G' 3-1/2"x 3-1/4" 9.3#/6.6# L-80 10278' 12255' 8786' 8920' 4-1/4" 113 sx Class'G' x 2-7/8" /6.4# 24. Open to production or injection? ®Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ( ) ( ) 2"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr80 9520' 9402'/8118' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. I 10870'-11100' 8927'-8926' -° ° , ` 11270'-11330' 8927-8925' ! e. - WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No 11790'-12230' 8921'-8920' r' DEPTH INTERVAL(MD AMOUNT AND KIND OF MATERIAL USED ilt ) "I 2500' Freeze Protect w/54 Bbls of Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ®No Sidewall Core(s)Acquired? ❑Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RRDMS MAR 14 Z013 Form 10-407 Revised 10/2012 vLf 511/0 CONTINUED ON REVERS ,,� Submit Original Only 6 29. GEOLOGIC MARKERS(List all formations an kers encounter 30. FORMATION TESTS NAME MD TVD Well Tested? ,J Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Zone 1B 10500' 8891' None TDF/Zone 1A 10610' 8919' Formation at Total Depth: TDF/Zone 1A 10610' 8919' 31.List of Attachment: Summary of Daily Drilling Reports,Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Email: David.Johnston2 @bp.com D id Johnston,564-5985 Printed Name: Title: Drilling Technologist Joe stufk Signature. Phone 564-4091 Date:?J/!//, 240 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= CI V _ V11f3 LHEAD= FMC 05-35B SAFETY/ " HROME TBG""'AIMTILAL AND"A""A1 WELLBORES ACTUATOR= BAKER PJC DRAFT /` f NOT SHOWN'** KB.env= 72'BF.ELEV KOP= 2800' 20"CONDUCTOR 110' Max Angle= 93°@ 106711'' 2204' }-4-1/2"HE'S X NP,D=3.813" Datum MU= 10429' 94.5#,H-40, D=19.124" GAS LIFT MANDRELS Datum D= 8800 SS ST MD DEV TYPE VLV LATCH FORT DATE 9-5/8"WHIPSTOCK(08/29/08) — 3861' 2 3775 3690 35 KGB2 DMY BK 0 12/30/12 1 6401 5739 42 KGB2 DMY BK 0 12/30/12 9-5/8"CSG,36#,J-55 BTC,D=8.921" l--{ ^3875 'K. MLLOUT WINDOW(05-35A) 3861'-3875' 7"CSG,264t,L-80 TOT XO L-80 BTC-M — 4212' 9371' --4-1/2"FES X NP,13=3.813" Minimum ID= 2.377"@ 11008' 3-3/16"X 2-7/8"XO ► 0 9402' ---17"X 4-1/2"BKR S-3 PKR,D=3.870" 9435' }—4-1/2"I-ES X NP,D=3.813" 9508' —14-1/2"FES XN NP,MILLED TO 3.80"(02/20/11) NOTE POSSIBLE DAMAGE TO LNR TOP/WLEG POST CTD ML(07/2011) J 9510' —7"X 5"FR ZXP LTP w/TESACK SLV,D=4.460" 41/2"TBG, 12.6#,13CR 80 VAM TOP, — 9520' �' "— 9520' }—41/2"WLEG,ID=3.958"- 0152 bpf,ID=3.958" 9533' }--7"X 5"BKR FMC LNR HGR,D=4.450" 9542' —5"X 4-1/2"XO,D=3.930" 7"CSG, 26#,L-80 BTC-M,.0383 bpf,D=6.276" H I 9676' HA TOP OF LNR 1--) 10278' 10278' —3.70"DEPLOY SLV,D=3.00" 10290' I—3-1/2"RJP JOINT,D=2.995 3-1/2"LNR 9.3#,L-80 STL,.0087 bpf,D=2.995" H 10426' 10426' }--3-1/7 XO TO 3-3/16",13=2.78" 4-1/2"LNR,12.6#,L-80 IBT-M.0152 bpf,D=3.958" —1 -.10800 4-1/2"MONOBORE WHPSTOCK(02/03/13) H 10485' 1 MLLOUT WINDOW(05.3513) 10485'- 10494' 3-1/4"LNR,6.6#,L-80 TCl,.0079 bpf,D=2.850" H 11008' \ 11008' }—3-3/16"X 2-7/8",D=2.377" PERFORATION SUMMARY REF LOG "?'>>> ANGLE AT TOP OF PERF: 90 10870°@ ' I Note:Refer to Production DB for historical per data I SIZE SIZE INTERVAL Opn/Sqz Shot SOZ 2" 6 10870-11100 0 02/12/13 2" 6 11270-11330 0 02/12/13 I 2" 6 11790-12230 0 02/12/13 PBTD H 12240' 2-7/8"LNR,6.414,L-80 STL.0058 bpf,D=2.441" — 12255' `dot DATE REV BY COMMENTS DATE REV BY COM ENTS PRLCHOE BAY L.NT 07/19/91 1)9/N2E5 INTIAL COMPLETION WELL: 05-35B 09/14/08 N7ES SIDETRACK(05-35A) PERMIT NO: 2121940 07/18/11 NORDIC 2 CTD MULTI-LAT(05-35AL1) AR No: 50-029-22172-02 02/14/13 NORDIC 1 CTD SIDETRACK(05-35B) SEC 32,T11 N,R15E,2323 FNL&124'FWL 02/15/13 PJC DRLG HO CORRECTIONS BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 15,, Operation S'ummary Report Common Well Name:05-35 AFE No Event Type RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316 00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UINI:500292217200 Active datum:05-35©72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/2/2013 14:15 - 14:30 0.25 DRILL N DPRB 12,257.0 PROD1 HOLD PJSM TO MU THE WS BHA(BHA ) 1430 - 15:40 1.17 DRILL N DPRB 12,257.0 PROD1 MU THE WS BHA RIH WITH WS BHA 15:40 - 17:05 1.42 DRILL N DFAL 2,700.0 PROD1 LOST COMMS TO MIND,POOH HOLD PJSM TO LD BHAAND TROUBLE SHOOT ELINE 17:05 - 17:10 0.08 DRILL N DFAL 2,700.0 PROD1 FLOW CHECK WELL 17:10 - 17:30 0.33 DRILL N DFAL 2,700.0 PROD1 GOOD NO FLOW,TAG UP,REMOVE INJECTOR AND TEST THE UQC,UQC LOOKS OK,TEST UPPER SECTION OF MWD 17:30 - 19:30 2.00 DRILL N DFAL 2,700.0 PROD1 MIND-TOOLING APPEARS TO HAVE AN INTERMITTENT SHORT.REPLACE MWD TOOLSTRING,ALL TESTS GOOD. 19:30 - 20:00 0.50 DRILL N DPRB 12,257.0 PROD1 MU BHA#7 COMPLETE WITH 4.5"KB PACKER WHIPSTOCK AND 10#J HYDRAULIC SETTING TOOL. = 20:00 - 20:30 0.50 DRILL N DPRB 12,257.0 PROD1 STAB ON INJECTOR.PRESSURE-TEST QTS TO 300PSI/5,MINS AND 4,000PSI/5 MINS. ACHIEVE GOOD TEST. 20:30 - 22:30 2.00 DRILL N DPRB 12,257.0 PROD1- COMMENCE RIH WITH BHA#7. MEANWHILE CONTINUE RKING DIRECTIONAL PLAN. 22:30 - 23:20 0.83 DRILL N DPRB 12,257.0 PROD1 LOG FOR TIE-IN AND APPLY DEPTH CORRECTION OF-14'. 23:20 - 23:40 0.33 DRILL N DPRB 12,257.0 PROD1 CONTINUE RIH. 23:40 - 00.00 0.33 DRILL N DPRB 12,257.0 PROD1 PERFORM CCL-LOG FROM 10,350'-10,600' AND PICK UP TO WHIPSTOCK SETTING DEPTH. 2/3/2013 00:00 - 0020 0.33 DRILL N DPRB 12,257.0 PROD1 ANALYSE CCL-DATAVVHILE PICKING UP TO WHIPSTOCK SETTING DEPTH: NOTICE 4.5"TUBING COLLAR AT 10,504'.IF THE WHIPSTOCK WAS SETAS PER OPERATIONAL CHANGE NOTE(OCN)WITH TOP OF WHIPSTOCK(TOWS)AT 10,495', THEN THE BOWS WOULD BE AT 10,510.7'. THIS WOULD PLACE THE PACKER-ELEMENT AT 10,506'-TOO CLOSE TO THE COLLAR. THUS DECIDE TO PLACE TOWS 10'HIGHER AT 10,485'.THAT WAY THE BOWS WILL BE AT 10,500.7'.THIS WILL GIVE 3.3'DISTANCE TO THE COLLAR.DISCUSS AND AGREE THIS CHANGE WITH ODE,GEO AND DD. 00:20 - 00:40 0.33 DRILL N DPRB 12,257.0 PROD1 PICK UP VVHIPSTOCK TO PLACE TOWS- 10,485'AND BOW-10,500.7'.ORIENT TRAY TO 340DEG TOOLFACE(I.E.20DEG LOHS). BRING PUMPS ONLINE AND SHEAR WHIPSTOCK AT 2,800PSI. SLACK OFF 3K LBS COIELD TUBING WEIGHT TO CONFIRM THAT WHIPSTOCK IS PROPERLY SET.OBSERVE NO ISSUES. 00:40 - 02:45 2.08 DRILL N DPRB 12,257.0 PROD1 POOH VVITH INFIIPSTOCK RUNNING TOOL. 02:45 - 03:00 0.25 DRILL N DPRB 12,257.0 PROD1 PULL TO 200'AND FLOVVCHECK VVELL FOR 5 MINS. 03:00 - 03:30 0.50 DRILL N DPRB 12,257.0 PROD1 UNSTAB INJECTOR AND LD BHA#7. Printed 3/4/2013 1:09:23PM 1111 North America-ALASKA-BP Pa.e 2 of 15 Operation Summary Report Common Well Name:05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project: Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time.6/1/1991 12:00:00AM Rig Release Rig Contractor NORDIC CALISTA UVVI 500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 03:50 0.33 DRILL N DPRB 12,257.0 PROD1 FUNCTION-TEST BOPE FROM DRILLER'S SIDE.ALL UPPER COMBI,VBRS,LOWER COMBI AND HCR FUNCTION&CLOSE WITHIN <5SEC. CHANGE-OUT PACK-OFFS ON INJECTOR. 03:50 - 04:40 0.83 DRILL N DPRB 12,257.0 PROD1 HOLD PJSM.CUT OFF CTC FOLLOWED BY 100'COIL FOR CHROME MANAGEMENT CHANGED OUT PACK-OFF'S ON INJECTOR. 04:40 - 05-20 0.67 DRILL N DPRB 12,257.0 PROD1 MU COILED TUBING CONNECTOR AND PULL-TEST TO 38K LBS;ALL GOOD. BOOT E-LINE CABLE AND CLOSE SWAB VALVE. 05:20 - 05:50 0.50 DRILL N DPRB 12,257.0 PROD1 INSTALL 5FT-STINGER AND PRESSURE-TEST COILED TUBING CONNECTOR. 05:50 - 07:15 1.42 DRILL N DPRB 12,257.0 PROD1 HEAD UP BHI AND MEG ELINE CABLE PT UQC 07:15 - 07.50 058 DRILL N SFAL 12,257.0 PROD1 STAB INJECTOR ON THE WELL,CIRC TO WARM COIL AND ENSURE THE WELL IS FULL. CLOSE THE SWAB TO PT THE PACK-OFFS, QTS AND BHI CHECK VALVES GOOD LOW PT,HIGH NOT DOING SO WELL. LINE UP TO WARM COIL AND RETEST 07:50 - 08:10 0.33 DRILL N SFAL 12,257.0 PROD1 RETEST PACK-OFFS,QTS AND BHI CV'S 08:10 - 08:45 0.58 DRILL N SEAL 12,257.0 PROD1 STILL NOTABLE TO GETA HIGH PT,BLEED OFF AND CIRC DOWN COIL TO TEST THE PACK-OFFS AND QTS,SUSPECT THE CVS ARE LEAKING.IF WE GET A GOOD PACK OFF AND QTS TEST THEN PU THE INJECTOR AND TEST THE BHI CVS INDEPENDENTLY LOOKS LIKE EVERYTHING IS HOLDING, BLEED OFF CT PRESSURE TO FINISH HIGH PT ON CHECK VALVES PRESSURE ALMOST STABILIZED BUT WE NEED TO PUMP TO WARM THE COIL 08:45 - 09:00 0.25 DRILL N SFAL 12,257.0 PROD1 FOUND A SMALL LEAK AT THE FLANGE ABOVE THE SWAB.THE SPOTTER IN THE CELLAR NOTICED IT AFTER WALIKNG AROUND IN THE CELLAR.CALLED CTD SUPT AND DISCUSSED FINDING WITH HIM AND THE DRILLING HSE ADVISOR.WE ARE GOING TO CHECKALL FLANGE BOLTS AND PERFORM A FULL BODY TEST 09:00 - 09:50 0.83 DRILL N SFAL 12,257.0 PROD1 RETEST PACK-OFFS,QTS,BHI CV'S AND FULL BODY TEST WE HAVE TRIED PUMPING FROM THE TEST PUMP AND COIL TO EQUALIZE THE PRESSURE AND WE ARE STILL NOTABLE TO GET A HIGH TEST BLEED OFF AND REMOVE INJECTOR FROM THE WELL TO TEST THE Bill CVS WITH THE TEST PUMP INSTALL THE NIGHT CAP AND TEST THE STACK 09:50 - 10:35 0.75 DRILL N SFAL 12,257.0 PROD1 PT THE BHI CVS,FAILED HIGH PT.R&R CHECK VALVES 10:35 - 11:05 0.50 DRILL N SFAL 12,257.0 PROD1 RETEST CHECK VALVES,FAILED,PULL AND INSTALL ANOTHER SET Printed 3/4/2013 1:09 23PM • North America-ALASKA-BP Page 3 of 15 Operation Summary Report Common Well Name:05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date: 2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project: Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:05 - 12:15 1.17 DRILL N SFAL 1 12,257.0 PROD1 PT THE BHI CV'S AND THEY FAILED INSTALL NIGHT CAP AND TEST STACK WHILE BHI TROUBLESHOOTS THEIR CVS GOOD LOW&HIGH TEST ON STACK WO BHI TECHS TO FIGURE OUT THE SEAL ON THE FLAPPER VALVES 12:15 - 12:45 0.50 DRILL N SFAL 12,257.0 PROD1 INSTALL 5TH SET OF BHI CVSAND TEST 12:45 - 13:00 0.25 DRILL N DPRB 12,257.0 PROD1 BHI CV TEST PASSED,REMOVE TEST EQUIPMENT AND STAB INJECTOR ON THE WELL TO TEST THE PACK-OFF AND QTS 13:00 - 13:25 0.42 DRILL N DPRB 12,257.0 PROD1 TEST PACK-OFF AND QTS 13:25 - 13:30 0.08 DRILL N DPRB 12,257.0 PROD1 GOOD PT,BLEED OFF AND CIRC TO WARM COIL LINE UP TO OPEN WELLAGAINSTA CLOSED CHOKE OPEN MASTER&SWAB VALVES 13:30 - 13:50 0.33 DRILL N DPRB 12,257.0 PROD1 NO PRESSURE ON WELL OPEN CHOKE AND PUMP TO ENSURE WELL IS FULL WELL IS FULL,SHUT DOWN TO MONITOR WELL FOR FLOW AND HOLD PJSM TO MU THE MILLING BHA GOOD NO FLOW 13:50 - 14:15 0.42 DRILL N DPRB 12,257.0 PROD1 REMOVE INJECTOR AND MU THE MILLING BHA 14:15 - 14:45 0.50 DRILL N DPRB 12,257.0 PROD1 PU THE INJECTOR AND MU TO THE BHA,PT THE QTS 14:45 - 16:20 1.58 DRILL N DPRB 12,257.0 PROD1 RIH WITH BHA#8 TO MILL THE WINDOW 16:20 - 16:40 0.33 DRILL N DPRB 12,257.0 PROD1 KWTDRILL***** CTS DRILLED CALLED OUT THAT HE IS SEENINGAN INCREASE IN OUT FLOW, STOPPED RIH AND SHUT DOWN HIS PUMP. THE NORDIC DRILLER STRAPPED THE PITS AND CONFIRMED A 5 BBL GAIN IN THE PITS AND THE WELL WAS SIMULATED TO BE SHUT IN AS PER THE DRILLERS STANDING ORDERS AND MONITORED FOR PRESSURE. SIMULATED NOTIFICATIONS WERE MADE TO THE DRLG SUPT,NORDIC SUPT&TOOL PUSHER.THE DRILLER CALLED OUT AND SAID HE IS SHOWING 150 PSI WELLHEAD PRESSURE THAT HAS STABILIZED AND I MADE NOTIFICATION TO THE DRLG SUPT WHO THEN GOT PERMISSION FROM THE WTL FOR US TO OPEN UP TO THE WELLAND START TAKING RETURNS THROUGH THE MGS USING THE DRILLERS METHOD TO CIRCULATE OUT THE KICK. 16:40 - 18:25 1.75 DRILL N DPRB 12,257.0 PROD1 LOG LONG 200'TIE IN 18:25 - 18:45 0.33 DRILL N DPRB 12,257.0 PROD1 CORRECT DEPTH-14'AND RIH TO TAG PINCH POINT 18:45 - 19:00 0.25 DRILL N DPRB 12,257.0 PROD1 TAG UP AT 10,486'. PU AND SLOWLY RIH AT 1 F/MIN.FREE SPIN-2,800PSI. Printed 3/4/2013 1:09:23PM • - .. •� .v.. .���-��. �;�%� North America-ALASKA- BP Operation Summary Report Common Well Name:05-35 AFE No • Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project: Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 19:45 0.75 DRILL N DPRB 12,257.0 PROD1 SEE FIRST MOTORWORKAGAIN AT 10,486'- START TIME-MILLING THE WINDOW AT 1FT/MIN. 19:13HRS / 10,806.50' / MM-IN-2.53 BPM / MM-OUT-2.54 BPM / CIRC P-2,981 PSI / DIFF P-543PSI. 19:45 - 00:00 4.25 DRILL N DPRB 12,257.0 PROD1 HAVE MILLED 1ST FOOT.STOP TIME-MILLING AND SLOWLY"LEAN"ON MILL TO INCREASE WOB. 20:30HRS / 10,488.0' / MM-IN-2.50 BPM / MM-OUT-2.53 BPM / CIRC P-2,996 PSI / DIFF P-593 PSI / WOB-2.35 K LBS 22:37 10,489.0' 2.49 2.50 2,950 614 2.63 00:00 10,489.6' 2.51 2.53 2,988 640 3.32 2/4/2013 00:00 - 01:30 1.50 DRILL N DPRB 12,257.0 PROD1 00:30HRS / 10,490.0' / MM-IN-2.48 BPM / MM-OUT-2.46 BPM / CIRC P-2,944 PSI / DIFF P-640 PSI / WOB-3.17 K LBS 01:30 10,492.0' 2.53 2.50 2,970 632 3.11 01:30 - 03:45 2.25 DRILL N DPRB 12,257.0 PROD1 AFTER 6'OF MILLING GO BACK TO TIME-MILLING TO ENSURE A CLEAN WINDOW IS CUT W/OUT EARLY EXIT OR LEDGES. 02:00 10,492.4' 2.52 2.51 2,904 2.50 02:30 10,493.1' 2.51 2.52 2,900 581 3.30 03:00 10,493.9' 2.49 2.50 3,043 748 3.80 AT 10,494.1'NOTICE THAT WOB AND MOTORWORK DROP SLIGHTLY,INDICATING THAT THE MILL HAS POPPED OUT OF THE WINDOW. 03:30 10,494.3' 2.48 2.48 2,970 667 2.70 03:45 - 04:15 0.50 DRILL N DPRB 12,257.0 PROD1 FOLLOWING 10,494.5 SEE AN INCREASE IN WOBAND MOTORWORK AGAIN,INDICATING THAT THE STRING MILL IS PASSING THROUGH THE WINDOW. 03:00 10,494.6' 2.51 2.50 3,069 738 3.24 04:15 - 05:00 0.75 DRILL N DPRB 12,257.0 PROD1 TIME MILL TO 10,495.8'. 05:00 10,494.8' 2.7 2.5 3,029 702 3.22 05:00 - 06:00 1.00 DRILL N DPRB 12,257.0 PROD1 STOP TIME-MILLING AND START DRILLING 2OFT RATHOLE. 06:00 - 08:40 2.67 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING RAT HOLE FREE SPIN=2800 PSI CIRC PSI=3018 PSI IN RATE=2.50 BPM OUT RATE=2.48 BPM ROP=6 FPH WOB=5.09K Printed 3/4/2013 1:09:23PM North America-ALASKA-BP page 5 of 1 ' Operation Summary Report Common Well Name:05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316 00) Project Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: • Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08-40 - 10:10 1.50 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING RAT HOLE FREE SPIN=2800 PSI CIRC PSI=3062 PSI IN RATE=2.51 BPM OUT RATE=2.49 BPM ROP=4 FPH VVOB=4.6K PUMP 20 BBL HI VIS PILL 10:10 - 10:20 0.17 DRILL N DPRB 12,257.0 PROD1 PILLAT THE MILL PU THROUGH VVINDOW 10:20 - 11:00 0.67 DRILL N DPRB 12,257.0 PROD1 PILL IS GONE,RIH TO FINISH RAT HOLE 11:00 - 12:40 1.67 DRILL N DPRB 12,257.0 PROD1 RAT HOLE DRILLED,PU TO DRESS VVINDOW HI-VIS PILL DID NOT BRING UP ANY MORE THAN NORMAL CUTTING OR METAL FREE SPIN=2670 PSI PASS COMING UP IN THE OH HAD A 300PSI INCREASE IN MOTOR WORK BUT THE WINDOW WAS CLEAN PASS GOING DOWN IS CLEAN PASS COMING UP HAD A LITTLE 1NORK MAKE ANOTHER PASS DOWN AND UP WINDOW LOOKS CLEAN,DRY DRIFT IN BOTH DIRECTIONS;VVINDOW IS CLEAN.PUH TO FLOW CHECK THE WELL 12:40 - 12:50 0.17 DRILL N DPRB 12,257.0 PROD1 FLOWCHECK WELL 12:50 - 14:00 1.17 DRILL N DPRB 12,257.0 PROD1 .GOOD NO FLOW,POOH FOR DRILLING BHA -PVT=301 BBLS 14:00 - 14:35 0.58 DRILL N DPRB 12,257.0 PROD1 PJSM TO LD&MU BHA'S 14:35 - 14:45 0.17 DRILL N DPRB 12,257.0 PROD1 JOG IN HOLE 200'THEN FLOW CHWCK WELL BEFOPRE TAG UP 14:45 - 14:50 0.08 DRILL N DPRB 12,257.0 PROD1 FLOW CHECK WELL 14:50 - 15:00 017 DRILL N DPRB 12,257.0 PROD1 GOOD NO FLOW CHECK,TAG UP AND REMOVE INJECTOR 15:00 - 15:20 0.33 DRILL N DPRB 12,257.0 PROD1 PULL BHA MWD COULD NOT BE BLOWN DOWN,MOTOR IS TO TIGHT,STBK MWD AND LD PH6 AND MOTOR 15:20 - 15:30 0.17 DRILL N DPRB 12,257.0 PROD1 BHA PULLED,WINDOW MILL GAUGED 3.80 GO 3.79 NO GO,COULD NOT GET THE GAUGE ON THE STRING MILL BTT HAND WILL BREAK THE MILLS OFF THE MOTORAT THE SHOP AND GAUGE THE STRING MILL RERUN MWD AND BLOW DOWN 15:30 - 16:00 0.50 DRILL N DPRB 12,257.0 PROD1 MU DRILLING BHA 16:00 - 16:25 0.42 DRILL N DPRB 12,257.0 PROD1 STAB INJECTOR ON VVELLAND PT THE QTS. RIH 16:25 - 18:15 1.83 DRILL N DPRB 12,257.0 PROD1 TIE IN.APPLY-15.5'DEPTH CORRECTION. 18:15 - 19:15 1.00 DRILL N DPRB 12,257.0 PROD1 CONTINUE RIH JUST BEFORE TAGGING BOTTOM,TAKE SLOW PUMP RATES. PUMP#1: PUMP#2: 3.07 BPM-3,100 PSI-129 SPM 37 BPM -3,075 PSI-127 SPM 1.53 BPM-1,830 PSI-64 SPM 154 BPM-1,950 PSI-64 SPM 0.5 BPM-1,290 PSI-21 SPM 052 BPM-1,385 PSI-22 SPM Printed 3/4/2013 1.09:23PM North America-ALASKA-BP Pa e 6 of 1 ' try Operation Summary Report n yf � s y Common Well Name 05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date 2/8/2013 X3-0133Y-C:DRILL(2,110,316 00) Project Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum'05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:15 - 22:00 2.75 DRILL N DPRB 12,257.0 PROD1 TAG UP AT 10,515'AND COMMENCE DRILLING AHEAD OUT OF RATHOLE INTO Z2A WITH GAMMA RAY SHOWING CLEAN SANDS WITH <30API.IDENTIFY TOP OF Z1 BAT 10,520'MD/ 8,835'TVD. ROP=14-20 FPH,WOB=0.6-1.7KLBS, CIRC PRESSURE=3,500-3,550 PSI @ 3.20BPM(3,450 PSI FREESPIN). MM IN=3.15 BPM / MM OUT=3.20 BPM MW IN=9.45 PPG / MW OUT=9.42 PPG / ECD=10.98 PPG PVT=296 BBLS / IA=443 PSI / OA=345 PSI 22:00 - 00:00 2.00 DRILL N DPRB 12,257.0 PROD1 DRILLING AHEAD BUT HAVE NOTICEDAFEW OF STALLS AS SOON AS COILED TUBING DRILLER TRIES TO APPLY MORE WOB. SLOWLY DRILL AHEAD,KEEPING WOB BELOW<2.0 K LBS. 2/5/2013 00:00 - 00:45 0.75 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD FROM 10,570'. 00:45 - 01:00 0.25 DRILL N DPRB ' 12,257.0 PROD1 APPEAR TO BE TEMPORARILY DIFFERENTIALLY STUCK.GET LOOSE BY PULLING TO MAX PUW ON COIL.ONCE BACK TO BOTTOM,NOTICE A 9'DISCREPANCY TO .PREVIOUS DRILLING DEPTH.PICK-UP,TIE IN TO RA-TAG AND APPLY A+9'DEPTH CORRECTION. 01:00 - 02:30 1.50 DRILL N DPRB 12,257.0 PROD1 DRILL AHEAD IN MOSTLY<40 API-SANDS WITH FEW GR-SPIKES. ROP=<20 FPH,WOB=1.0-2.5 K LBS,CIRC PRESSURE=3,500-3,600 PSI MM IN=3.35 BPM / MM OUT=3.39 BPM MW IN=9.46 PPG / MW OUT=9.42 PPG / ECD=10.99 PPG PVT=287 BBLS / IA=460 PSI / OA=360 PSI 02:30 - 03:35 1.08 DRILL N DPRB 12,257.0 PROD1 ABLE TO APPLY SLIGHTLY HIGHER WOB BETWEEN 3.5-3.8 K LBS WITHOUT STALLING (HAVE HAD 7 STALLS SO FAR),HOWEVER STILL DRILLING AT-15 FT/HR.ALSO SEE PLENTY OF"RED"XY-VIBRATION. 03:35 - 04:00 0.42 DRILL N DPRB 12,257.0 PROD1 PERFORM 100'BHA-WIPER 04:00 - 06:20 2.33 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD WITH LOW ROP =<20 FPH,LOW WOB=<1.5 K LBS AND CIRC PRESSURE=<3,000 PSI.STILL HAVING ISSUES TO INCREASE WOBAND ROP WITHOUT STALLING THE BIT. FURTHERMORE,WHEN DRILLING AT LOW WOBAND ROP,COIL IS STACKING WEIGHT REGULARLY. MM IN=2.60 BPM / MM OUT=2.62 BPM MW IN=9.44 PPG / MW OUT=9.42 PPG / ECD=10.89 PPG PVT=287 BBLS (NO LOSSES). IA=443 PSI / OA=377 PSI 06:20 - 07:05 0.75 DRILL N DPRB 12,257.0 PROD1 OBTAIN SPR'S,UPDATE KILL SHEET CONTINUE DRILLING AHEAD FREE SPIN AT 2.92 BPM =3065 PSI ROP=20 FPH WOB=1.0-2.0 K LBS CIRC PRESSURE=3250 PSI MM IN=2.90 BPM/MM OUT=2.93 BPM MW IN=9.46 PPG/MW OUT=9.43 PPG ECD=10.91 PPG PVT=286 BBLS IA=447 PSI OA=382 PSI Printed 3/4/2013 1:09 23PM • North America-ALASKA-BP Page 7 ofd` • Operation Summary Report Common Well Name:05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project Prudhoe Bay Site PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time 6/1/1991 12 00 OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:05 - 07:50 0.75 DRILL N DPRB 12,257.0 PROD1 VERY SLOW ROP AND EASY TO STALL.FREE SPINAT2.9 BPM=3065 PSI,STALLS ARE 4400+PSI.TRY INCREASING PUMP RATE TO 3.4 BPM,NIGHT SHIFT TRIED HIGHER FLOW RATES AND EXPERIENCED HEAVY VIBRATION.HIGHER RATE IS WORKING,ROP IS IMPROVING. 07:50 - 08:30 0.67 DRILL N DPRB 12,257.0 PROD1 PU TO GIVE DD TIME TO LOOK AT THE 2 GOOD SURVEYS WE HAVE. 08:30 - 09:50 1.33 DRILL N DPRB 12,257.0 PROD1 . CONTINUE DRILLING. 09:50 - 11:00 1.17 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD,ABLE TO MAKE BETTER FOOTAGE BUT STILL HAVING A STALL NOWAND THEN FREE SPIN AT 2.92 BPM =3535 PSI ROP=40 FPH WDB=1.5-3.5 K LBS CIRC PRESSURE=3780 PSI' MM IN=3.35 BPM/MM OUT=3.39 BPM MW IN=9.47 PPG/MW OUT=9.46 PPG ECD=11.01 PPG PVT=285 BBLS IA=550 PSI OA=435 PSI 11:00 - 12:05 1.08 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD FREE SPIN AT 3.35 BPM =3535 PSI ROP=60 FPH WOB=2.5-6.0 K LBS CIRC PRESSURE=3956 PSI MM IN=3.38 BPM/MM OUT=3.36 BPM MW IN=9.48 PPG/MW OUT=9.47 PPG ECD=11.13 PPG PVT=284 BBLS IA=624 PSI OA=503 PSI 12:05 - 12:50 0.75 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD FREE SPIN AT 3.35 BPM =3535 PSI ROP=50 FPH VVOB=4.5 K LBS CIRC PRESSURE=4072 PSI MM IN=3.39 BPM/MM OUT=3.39 BPM MW IN=9.50 PPG/MW OUT=9.45 PPG ECD=11.08 PPG PVT=282 BBLS IA=677 PSI OA=530 PSI BHA WIPER IS CLEAN 12:50 - 14:00 1.17 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD FREE SPIN AT 3.35 BPM =3535 PSI ROP=80 FPH WOB=2.66 K LBS CIRC PRESSURE=3882 PSI MM IN=3.35 BPM/MM OUT=3.35 BPM MW IN=9.48 PPG/MW OUT=9.47 PPG ECD=11.11 PPG PVT=282 BBLS IA=714 PSI OA=551 PSI 14:00 - 14:30 0.50 DRILL N DPRB 12,257.0 PROD1 WIPER TO WINDOW,STAKING A LITTLE WT& PU'S ARE GETTING STICKY PVT=282 OVER PULL AT 10825'IN THE MIDDLE OFA HOT SHALE. 14:30 - 15:25 0.92 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD FREE SPIN AT 3.35 BPM =3535 PSI ROP=90 FPH WDB=2.96 K LBS CIRC PRESSURE=3933 PSI MM IN=3.45 BPM/MM OUT=3.45 BPM MW IN=9.50 PPG/MW OUT=9.48 PPG ECD=11.11 PPG PVT=281 BBLS IA=771 PSI OA=593 PSI Printed 3/4/2013 1 09:23PM • • North America-ALASKA-BP Page 8 of 1 Operation Summary Report Common Well Name 05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project: Prudhoe Bay Site PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35©72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:25 - 15:40 0.25 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD FREE SPIN AT 3.35 BPM =3535 PSI ROP=95 FPH WOB=3.01 K LBS CIRC PRESSURE=4043 PSI MM IN=3.45 BPM/MM OUT=3.46 BPM MW IN=9.50 PPG/MW OUT=9.47 PPG ECD=11.15 PPG PVT=281 BBLS IA=796 PSI OA=612 PSI 15:40 - 16:15 0.58 DRILL N DPRB 12,257.0 PROD1 IA&OA=808 PSI&616 PSI,BLEED IA&OA EACH DOWN TO 200 PSI. 16:15 - 16:50 0.58 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD FREE SPIN AT 3.35 BPM =3535 PSI ROP=95 FPH WOB=5.75 K LBS CIRC PRESSURE=4072 PSI MM IN=3.44 BPM/MM OUT=3.45 BPM MW IN=9.50 PPG/MW OUT=9.49PPG ECD=11.18 PPG PVT=280 BBLS IA=275 PSI OA=612 PSI 16:50 - 17:45 0.92 DRILL N DPRB 11,037.0 PROD1 DIFFERENTIALLY STUCK 18:00 CALLED DRLG SUPT,ODE AND FOR MINERAL OIL 17:45 - 17:55 0.17 DRILL N DPRB 11,037.0 PROD1 BOTTOMS UP,SHUT DOWN PUMP TO RELAX COIL. 17:55 - 18:45 0.83 DRILL N DPRB 11,037.0 PROD1 RELAXED COIL FOR 10 MIN AND PULLED FREE AT 92K,POOH TO TIE IN PVT=281 BBLS.PULL AT 34 FEET PER MINUTE WITH NO OVER PULLS.PUMPAT4.3 BPM WITH 3530 PSI.MUD WEIGHT IN AND OUT 9.5 PPG. PERFORM TIE-IN LOG WITH PLUS 5 FOOT CORRECTION. 18:45 - 20:00 1.25 DRILL N DPRB 12,257.0 PROD1 OPEN EDC AND LOG CCL DOWN FROM 10,100'MD TO WINDOWAT 10,485'MD FOR LINER TOP LOCATION.RIH HOLE TO BOTTOM WITH NO PROBLEMS.RUN AT 34 FEET PER MINUTE.PUMP AT 1 BPM WITH 1500 PSI AND 3.6 BPM WITH 3640 PSI.MUD WEIGHT IN AND OUT 9.5 PPG.UP WEIGHT 39K,DOWN 13K. 20:00 - 21:00 1.00 DRILL N DPRB 12,257.0 PROD1 DIRECTIONAL DRILL AHEAD TO 11,092'MD. PUMP AT 3.65 BPM WITH 3900 PSI,FREE SPIN 3640 PSI.IN RATE 3.3 BPM OUT RATE 3.4 BPM.ROP 40-63 FEET PER HOUR.WEIGHT ON BIT 5.4KAND ECD 11.14 PPG.MUD WEIGHT IN AND OUT 9.5 PPG.VOLUME 280 BBLS. 21:00 - 22:00 1.00 DRILL N DPRB 12,257.0 PROD1 DIRECTIONAL DRILL AHEAD TO 11,160'MD. PUMP AT 3.6 BPM WITH 3800 PSI,FREE SPIN 3600 PSI.IN RATE 3.6 BPM OUT RATE 3.4 BPM.ROP 70 FEET PER HOUR.WEIGHT ON BIT 2.5K WITH 10K DOWN VVEIGHTAND ECD 11.19 PPG.MUD WEIGHT IN AND OUT 9.5 PPG. VOLUME 280 BBLS.OA=450 PSI, IA=300 PSI. 22:00 - 23:15 1.25 DRILL N DPRB 12,257.0 PROD1 DIRECTIONAL DRILL AHEAD TO 11,200'MD. PUMP AT 3.6 BPM WITH 3850 PSI,FREE SPIN 3630 PSI. IN RATE 3.3 BPM OUT RATE 3.3 BPM.ROP 30-60 FEET PER HOUR.WEIGHT ON BIT 4.2K WITH 9K DOWN WEIGHT AND ECD 11.17 PPG.MUD WEIGHT IN AND OUT 9.5 PPG.VOLUME 280 BBLS.OA=490 PSI, IA= 345 PSI. Printed 3/4/2013 1:09:23PM I • 1 • North America ALASKA BP ?a•. s , Operation Summary Report Common Well Name 05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project. Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release. Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:15 - 00:00 0.75 DRILL N DPRB 12,257.0 PROD1 PERFORM WIPER TO WINDOW. PULL AT 14 FPM WITH 40K UP WEIGHT,12K DOWN WEIGHT.PUMP AT 3.1 BPM WITH 3140 PSI. MUD WEIGHT IN AND OUT 9.5 PPG.NO PROBLEMS.PIT VOLUMEAT MIDNIGHT 275 BBLS. 2/6/2013 00:00 - 00:30 0.50 DRILL N DPRB 12,257.0 PROD1 PERFORM WIPER FROM 11,200'MD TO WINDOWAT 10,494'MD. PULL AT 14 FPM WITH 40K UP WEIGHT, 12K DOWN WEIGHT. PUMPAT3.1 BPM WITH 3140 PSI.MUD WEIGHT IN AND OUT 9.5 PPG.NO PROBLEMS. PIT VOLUME AT MIDNIGHT 275 BBLS. 00:30 - 02:00 1.50 DRILL N DPRB 12,257.0 PROD1 DIRECTIONAL DRILL AHEAD TO 11,234'MD. PUMPAT3.4 BPM WITH 3630 PSI,FREE SPIN 3450 PSI.IN RATE 3.3 BPM OUT RATE 3.3 BPM.ROP 30 FEET PER HOUR.WEIGHT ON BIT 4.5K WITH 8K DOWN WEIGHT AND ECD 11.13 PPG.MUD WEIGHT IN AND OUT 9.5 PPG. VOLUME 277 BBLS.OA=490 PSI, IA=345 PSI. 02:00 - 03:00 1.00 DRILL N DPRB 12,257.0 PROD1 DIRECTIONAL DRILL AHEAD TO 11,272'MD. PUMPAT3.5 BPM WITH 4100 PSI,FREE SPIN 3400 PSI.IN RATE 3.15 BPM OUT RATE 3.2 BPM.ROP 56 FEET PER HOUR.WEIGHT ON BIT 6.98K WITH 37k UP WEIGHT, -5300K DOWN WEIGHT AND ECD 11.14 PPG.MUD WEIGHT IN AND OUT 9.5 PPG.VOLUME 274 BBLS.OA=535 PSI, IA=400 PSI. 03:00 - 04:15 1.25 DRILL N DPRB 12,257.0 PROD1 DIRECTIONAL DRILL AHEAD TO 11,351'MD. PUMP AT 3.4 BPM WITH 3850 PSI,FREE SPIN 3400 PSI.IN RATE 3.10 BPM OUT RATE 3.2 BPM.ROP 110 FEET PER HOUR.WEIGHT ON BIT 2.4K WITH 40K UP WEIGHT, 7.5K DOWN VVEIGHTAND ECD 11.24 PPG.MUD WEIGHT IN AND OUT 9.5 PPG.VOLUME 274 BBLS.OA= 550 PSI, IA=430 PSI. 04.15 - 05:30 1.25 DRILL N DPRB 12,257.0 PROD1 PERFORM WIPER FROM 11,351'MD TO WINDOWAT 10,494'MD.PULLAT21 FPM WITH 40K UP WEIGHT, 12K DOWN WEIGHT. PUMPAT3.45 BPM WITH 3500 PSI.MUD WEIGHT IN AND OUT 9.5 PPG.NO PROBLEMS, RE-WIPE 11,250'MD WHERE ORIENTATION WAS CHANGED,CLEAR.PIT VOLUME AT 274 BBLS. 05:30 - 06:40 1.17 DRILL N DPRB 12,257.0 PROD1 DIRECTIONAL DRILL IN LATERAL SECTION. OBTAIN SPR'S AND CONTINUE DRILLING 06:40 - 08:25 1.75 DRILL N DPRB 12,257.0 PROD1 SLOW ROP DRILLING IN ASHALE,MUD SOLIDS ARE AT 0.9%.NO PROBLEMS GETTING WT TO THE BIT OR SLIDE. GEO SAYS WE GOT UP INTO THE 13N SHALE AND WILL TAKE AWHILE TO GET OUT OF IT CONTINUE SLOW DRILLING Printed 3/4/2013 1 09:23PM • • North America-ALASKA-BP Page 10 of 15 Operation Summary Report Common Well Name 05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project: Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:OOAM Rig Release: Rig Contractor NORDIC CALISTA UVN:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:25 - 14:00 5.58 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING AHEAD FREE SPIN AT 3.07 BPM =3450 PSI ROP=6 FPH WOB=5.0-7.5 K LBS CIRC PRESSURE=4178 PSI MM IN=3.10 BPM/MM OUT=3.12 BPM MW IN=9.54 PPG/MW OUT=9.50 PPG ECD=11.25 PPG PVT=266 BBLS IA=480 PSI OA=586 PSI SAMPLE FROM 10400'HASA LOT OF CLAY IN IT WHICH EXPLAINS THE SOW ROP.TRY PICKING UP AND PUTTING THE BIT JUST OFF BOTTOM TO TRYAND CLEAR THE BIT IF ITS BALLED UP MUD PLANT IS BACKED UP AND WE ARE IN LINE 14:00 - 14:30 0.50 DRILL N DPRB 12,257.0 PROD1 SLOW ROP DROPPING ANGLE TO GET OUT OF THIS CLAY/SHALE PU 100'TO CHECK WELL BEHIND US,PU IS CLEAN RIH TO TRY DRILLING AGAIN 2ND MUD TRUCK JUST LEFT THE MI PLANT 14:30 - 14:50 0.33 DRILL N DPRB 12,257.0 PROD1 START NEW MUD DOWN HOLE 14:50 - 15:05 0.25 DRILL N DPRB 12,257.0 PROD1 NEW MUD AT THE BIT,PUMP 5 BBLS THEN PU 200'THEN TRY DRILLING AGAIN 15:05 - 15:30 0.42 DRILL N DPRB 12,257.0 PROD1 BACK ON BOTTOM NOT SEEING MUCH IMPROVEMENT IN DRILLING 15:30 - 15:40 0.17 DRILL N DPRB 12,257.0 PROD1 FLOW CHECK WELL&POOH TO CHECK BIT 15:40 - 16:20 0.67 DRILL N DPRB 12,257.0 PROD1 GOOD NO FLOW CHECK POOH TO VVINDOW 16:20 - 16:30 0.17 DRILL N DPRB 12,257.0 PROD1 STOP ABOVE VMNDOWANDFLOVVCHECK WELL 16:30 - 19:30 3.00 DRILL N DPRB 12,257.0 PROD1 GOOD NO FLOW CHECK,POOH PVT=187 BBLS.FLOW CHECK AT 200'FOR BHA- STATIC. 19:30 - 20:00 0.50 DRILL N DPRB 12,257.0 PROD1 LAY DOWN BHA WITH 3.125 ULTRA XL MOTOR.BREAK OUT BIT WITH A GRADE OF 1-1-PN-N-X-1-ER-PR. 20:00 - 21:00 1.00 DRILL N DPRB 12,257.0 PROD1 MAKE UP NEW HUGHES DOUBLE SLICK 4.125"BIT WITH A 2.785 XTREME MOTOR SET TO 1.21°AKO.SWAP POSITION OF DGS WITH USMPR FOR CLOSER TO BIT DATA.SCRIBE TOOLFACE. 21:00 - 21:30 0.50 DRILL N DPRB 12,257.0 PROD1 STAB INJECTOR AND TEST QUICK TEST SUB TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH-PASS. 21:30 - 23:30 2.00 DRILL N DPRB 12,257.0 PROD1 RIH TO 3000'AT 90 FOOT PER MINUTE PUMPING AT 0.25 BPM WITH 1050 PSI.MUD WEIGHT IN AND OUT 9.4 PPG.DOWN WEIGHT 2K.VOLUME 264 BBLS.RIH TO 6500'AT 87 FPM.DOWN WEIGHT 8K.PUMP AT 0.25 BPM WITH 1200 PSI.MUD WEIGHT 9.4 PPG IN AND OUT.PIT VOLUME 281 BBLS. RIH TO 10,500'. 23:30 - 00:00 0.50 DRILL N DPRB 12,257.0 PROD1 LOG TIE-IN AT 10,500'AT 100 FPH.PUMP AT 0.25 BPM WITH 1300 PSI.DOWN WEIGHT 17K. IA=0 PSI,OA=40 PSI.CORRECTION OF MINUS 14 FEET. 2/7/2013 00:00 - 01:00 1.00 DRILL N DPRB 12,257.0 PROD1 RUN IN HOLE TO 11,428'MDAT32 FPM.PUMP AT 2.4 BPM WITH 2670 PSI. DOWN WEIGHT 15K.MUD WEIGHT IN AND OUT 9.4 PPG. Printed 3/4/2013 1:09:23PM • North America-ALASKA-BP Operation Summary Report Common Well Name 05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project Prudhoe Bay Site:PB OS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 02:30 1.50 DRILL N DPRB 12,257.0 PROD1 DIRECTIONALLY DRILLAHEAD TO 11,494'MD AT 30-60 FOOT PER HOUR.PUMP AT 3.0 BPM WITH 3550 PSI AND FREE SPIN OF 3080 PSI. DOWN WEIGHT 9K WITH WEIGHT ON BIT 3.25K.MUD WEIGHT IN AND OUT 9.4 PPG WITH AND ECD OF 11.11 PPG.IN RATE AT 2.63 BPM,OUT RATE AT 2.5 BPM. 02:30 - 03:00 0.50 DRILL N DPRB 12,257.0 PROD1 PULL UP TO 11,405'MD.MAD PASS DOWN TO 11,435'MD AT 300 FOOT PER HOUR.PUMP AT MINIMAL RATE SO AS NOT TO TURN BIT. 03:00 - 05:00 2.00 DRILL N DPRB 12,257.0 PROD1 DIRECTIONALLY DRILLAHEAD TO 11,600'MD AT 30-75 FOOT PER HOUR.PUMP AT 3.0 BPM WITH 3590 PSI AND FREE SPIN OF 3080 PSI. DOWN WEIGHT 4K WITH WEIGHT ON BIT 4.8K.MUD WEIGHT IN AND OUT 9.4 PPG WITH AND ECD OF 11.15 PPG.IN RATE AT 2.7 BPM, OUT RATE AT 2.75 BPM. 05:00 - 06:40 1.67 DRILL N DPRB 12,257.0 PROD1 PERFORM WIPER FROM 11,600'MD TO WNDOWAT 10,485'MD. UP WEIGHT 38K, DOWN WEIGHT 13K.PUMP AT 2.87 WITH 3170 PSI.MUD WEIGHT IN AND OUT 9.4 PPG.PIT VOLUME 326 BBLS. HOLD KICK WHILE DRILLING DRILL.ONE CREW MEMBER NEW TO THIS DRILLERS CREW SO WE WALKED CREW MEMBERS THROUGH PROCESS OF SHUTTING IN,VERIFY ACCUMULATOR,GO THROUGH LINE UP,WALKED THROUGH SHUT DOWN OF EQUIPMENT,EQUALIZE PRESSURE,NOTE PIT VOLUMES AND FLUID NEEDS.OPEN UP AND MONITOR.APPOINT SCRIBE AND MAKE NOTIFICATIONS. 06:40 - 06:50 0.17 DRILL N DPRB 12,257.0 PROD1 OBTAIN SPR'SAND UPDATE KILL SHEET 06:50 - 08:30 1.67 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING FREE SPIN AT 2.70 BPM =3122 PSI ROP=80 FPH WOB=3.5-5.0 K LBS CIRC PRESSURE=3735 PSI MM IN=2.76 BPM/MM OUT=2.76 BPM MW IN=9.45 PPG/MW OUT=9.42 PPG ECD=11.23 PPG PVT=321 BBLS IA=140 PSI OA=273 PSI 08:30 - 08:50 0.33 DRILL N DPRB 12,257.0 PROD1 OUT MM PACKING OFF,LOOKS LIKE CLAY BALLS 08:50 - 09:50 1.00 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING FREE SPIN AT 2.70 BPM =3122 PSI ROP=80 FPH WOB=4.69 K LBS CIRC PRESSURE=3720 PSI MM IN=281 BPM/MM OUT=2.84 BPM MW IN=9.44 PPG/MW OUT=9.41 PPG ECD=11.32 PPG PVT=320 BBLS IA=140 PSI OA=273 PSI 09:50 - 11:20 1.50 DRILL N DPRB 12,257.0 PROD1 WIPER TO WINDOW PULLED HEAVY AT 11705'RIH AND POPPED FREE,PULL BACK THROUGH OK STILL GETTING A LOT OF CLAY BALLS ACROSS THE SHAKER Printed 3/4/2013 1:09:23PM North America-ALASKA-BP P e 2 ofnt Operation Summary Repo Common Well Name:05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:20 12:00 0.67 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING FREE SPIN AT 2.70 BPM =3122 PSI ROP=90 FPH WOB=1.62 KLBS CIRC PRESSURE=3664 PSI MM IN=2.60 BPM/MM OUT=2.54 BPM MW IN=9.45 PPG/MW OUT=9.41 PPG ECD=11.33 PPG PVT=313 BBLS LOST 7 BBLS DURING WIPER IA=361 PSI OA=457 PSI 12:00 - 13:40 1.67 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING FREE SPIN AT 2.70 BPM =3122 PSI ROP=90 FPH WOB=1.62 K LBS CIRC PRESSURE=3664 PSI MM IN=2.60 BPM/MM OUT=2.54 BPM MW IN=9.45 PPG/MW OUT=9.41 PPG ECD=11.33 PPG PVT=313 BBLS LOST 7 BBLS DURING WIPER IA=361 PSI OA=457 PSI CLAY BALLS HAVE CLEANED UP NOW THAT WE ARE IN Z1B 13:40 - 14:35 0.92 DRILL N DPRB 12,257.0 PROD1 WIPER TO WINDOW PVT=308 BBLS PULLED HEAVY AT 11709'RIH AND POPPED FREE,PULL BACK THROUGH WITH SMALL OVER PULLS 14:35 - 14:50 0.25 DRILL N DPRB 12,257.0 PROD1 LOG TIE IN 14:50 - 15:40 0.83 DRILL N DPRB 12,257.0 PROD1 CORRECT DEPTH+8.5'AND RIH 15:40 - 16:15 0.58 DRILL N DPRB 12,257.0 PROD1 BACK ON BOTTOM DRILLING FREE SPIN AT 2.70 BPM =3250 PSI ROP=135 FPH WOB=2.01 K LBS CIRC PRESSURE=3523 PSI MM IN=2.50 BPM/MM OUT=2.47 BPM MW IN=9.48 PPG/MW OUT=9.45 PPG ECD=11.25 PPG PVT=308 BBLS LOST 0 BBLS DURING WIPER IA=382 PSI OA=479 PSI 16:15 - 17:30 1.25 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING FREE SPIN AT 2.70 BPM =3250 PSI ROP=90 FPH WOB=1.51 K LBS CIRC PRESSURE=3398 PSI MM IN=2.50 BPM/MM OUT=2.47 BPM MW IN=9.48 PPG/MW OUT=9.45 PPG ECD=11.30 PPG PVT=307 BBLS IA=398 PSI OA=492 PSI 17:30 - 18:30 1.00 DRILL N DPRB 12,257.0 PROD1 CONTINUE DRILLING FREE SPIN AT 2.70 BPM =3250 PSI ROP=120 FPH WOB=1.51 K LBS CIRC PRESSURE=3398 PSI MM IN=2.50 BPM/MM OUT=2.47 BPM MW IN=9.48 PPG/MW OUT=9.45 PPG ECD=11.30 PPG PVT=306 BBLS IA=398 PSI OA=492 PSI Printed 3/4/2013 1:09:23PM • North America-ALASKA-BP Page 13 of 1 ; :*1 Operation Summary Report Common Well Name:05-35 AFE No Event Type RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project Prudhoe Bay Site PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA U1NI:500292217200 Active datum:05-35©72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 20:45 2.25 DRILL N DPRB 12,257.0 PROD1 PERFORM WIPER FROM 12,050'MD TO VVINDOWAT 10,500'MD. PULL AT 20-30 FPM WITH 39 UP WEIGHT.PUMP AT 2.35 BPM WITH 2740 PSI.MUD WEIGHT IN AND OUT 9.5 PPG.PIT VOLUME 301 BBLS. IA 390 PSI,OA 500 PSI. RUN BACK IN HOLE AT 33 FPM WITH 12K DOWN WEIGHT.PUMP AT 2.78 BPM WITH 3150 PSI SLOW PUMPS DOWN TO 1.6 BPM WITH 2160 PSI THROUGH SHALES AT 11,150' MD TO 11,250'MDAND 11,350'MD TO 11,750' MD. 20:45 - 23:00 2.25 DRILL N DPRB 12,257.0 PROD1 DIRECTIONALLY DRILL AHEAD TO 12,205'MD AT 50-120 FOOT PER HOUR.PUMP AT 3.0 BPM WITH 3620 PSI AND FREE SPIN OF 3000 PSI. DOWN WEIGHT 11K WITH WEIGHT ON BIT 1.4K.MUD WEIGHT IN AND OUT 9.5 PPG WITH AND ECD OF 11.32 PPG.IN RATE AT 2.7 BPM, OUT RATE AT 2.74 BPM.IA=410 PSI,OA=500 PSI. 23:00 - 00:00 1.00 DRILL N DPRB 12,257.0 PROD1 PERFORM WIPER FROM 12,205'MD TO WINDOWAT 10,500'MD. PULL AT 20-30 FPM WITH 41 UP WEIGHT.PUMP AT 2.6 BPM WITH 2970 PSI.MUD WEIGHT IN AND OUT 9.5 PPG. PIT VOLUME 298 BBLS. IA 390 PSI,OA 500 PSI. RUN BACK IN HOLE AT 33 FPM WITH 12K DOWN WEIGHT.PUMP AT 2.78 BPM WITH 3150 PSI.SLOW PUMPS DOWN TO 1.6 BPM WITH 2160 PSI THROUGH SHALES AT 11,150' MD TO 11,250'MD AND 11,350'MD TO 11,750' MD. 2/8/2013 00:00 - 01:00 1.00 DRILL N DPRB 12,257.0 PROD1 PERFORM WIPER FROM 12,205'MD TO WINDOWAT 10,500'MD. PULL AT 20-30 FPM WITH 41 UP WEIGHT.PUMP AT 2.6 BPM VVITH 2970 PSI.MUD WEIGHT IN AND OUT 9.5 PPG. PIT VOLUME 298 BBLS.IA 390 PSI,OA 500 PSI. RUN BACK IN HOLE AT 33 FPM WITH 12K DOWN WEIGHT.PUMP AT 2.78 BPM WITH 3150 PSI.SLOW PUMPS DOWN TO 1.6 BPM WITH 2160 PSI THROUGH SHALES AT 11,150' MD TO 11,250'MD AND 11,350'MD TO 11,750' MD. 01:00 - 02:00 1.00 DRILL N DPRB 12,257.0 PROD1 DIRECTIONALLY DRILL AHEAD TO 12,250'MD AT 50-120 FOOT PER HOUR.PUMP AT 2.8 BPM WITH 3955 PSI AND FREE SPIN OF 3150 PSI DOWN WEIGHT 4K WITH WEIGHT ON BIT 2.8K.MUD WEIGHT IN AND OUT 9.5 PPG WITH AND ECD OF 11.43 PPG.IN RATE AT 2.6 BPM, OUT RATE AT 2.55 BPM.IA=360 PSI,OA=450 PSI ORIENTER FAILED ON HOT DECISION FROM TOWN TO CALL TD EARLY DUE TO HOT TOOL FAILURE.REACHED TD OF PREVIOUS VVELLBORE AT 12,250'MD,ENDING NPT FOR HOLE INSTABILITY. 02:00 - 03:00 1.00 DRILL P PROD1 PERFORM WIPER FROM 12,250'MD TO WINDOWAT 10,500'MD. PULL AT 20-30 FPM WITH 39K UP WEIGHT.PUMP AT 2.0 BPM WITH 2450 PSI.MUD WEIGHT IN AND OUT 9.5 PPG NO PROBLEMS ON UP WIPE IA 320 PSI, OA 430 PSI. 03:00 - 03:30 0.50 DRILL P PROD1 LOG TIE IN AT 10,500'MD.CORRECTION OF PLUS 10 FEET. Printed 3/4/2013 1:09:23PM North America-ALASKA-BP Page 14 of Operation Summary Report Common Well Name 05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project: Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UVVI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:30 1.00 DRILL P PROD1 WIPE BACK TO BOTTOM AT 33 FPM.PUMP AT 1.75 BPM WITH 3225 PSI. DOWN WEIGHT 13K. IN 1.61 BPM,OUT 1.78 BPM.MUD WEIGHT IN AND OUT 9.5 PPG.IA=230 PSI,OA=370 PSI. NO PROBLEMS OBSERVED.CORRECTED TD IS 12,259'MD. 04:30 - 05:30 1.00 DRILL P PROD1 WIPER TRIP FROM 12,259'MD TO 11,850'MD. NO PROBLEMS UP OR DOWN.UP WEIGHT 39K,DOWN 12K.START LINER RUNNING PILL, 20 BBLS. 05:30 - 06:35 1.08 DRILL P PROD1 FLOW CHECK WELL-STATIC.POOH.LAY IN LINER RUNNING PILL.PULLAT28 FPM PUMPING AT.35 BPM WITH 1320 PSI. UP WEIGHT 45K.MUD WEIGHT IN AND OUT 9.5 PPG. 06:35 - 06:40 0.08 DRILL P PROD1 ABOVE THE WINDOW,SHUT DOWN PUMP TO FLOW CHECK WELL 06:40 - 08:10 1.50 DRILL P PROD1 GOOD NO FLOW,POOH STOPPING AT 9900' EOP(9978.8'BIT)AND 8100'EOP(8178.8'BIT) DEPTHS FOR LINER FLAGS 08:10 - 08:40 0.50 DRILL P PROD1 *****KICK WHILE TRIPPING DRILL***** NORDIC DRILLER SIMULATED AN INCREASE IN OUT FLOW WHILE TRIPPING OOH.HE ASKED THE CTS OPERATOR TO STOP POOH AND SHUT DOWN THE PUMP.HE THEN SAID THAT THE WELL WAS CONTINUING TO FLOW AND SHUT THE WELL IN AS PER THE DRILLERS STANDING ORDERS.VITH A 5 BBL GAIN IN THE PITS WE SIMULATED MAKING CALLS TO THE BP DRLG SUPT AND NORDIC SUPT WHILE WE WERE MONITORING THE WELL FOR PRESSURE.THE CREW CALLED IN FROM THEIR POSITIONS AT THE KOOMEY, SHAKER AND CELLAR.THE DRILLER THEN SAID THE WELL HAD STABILIZED WITH-50 PSI ON THE WELLHEAD.I MADE ANOTHER CALL TO THE DRLG SUPT WHO MADE A CALL TO THE WTL WHO GAVE US PERMISSION TO OPEN THE WELL THE WELL WAS OPENED TOACLOSED CHOKE THEN CRACKED OPEN TO START OUR FIRST CIRCULATION OF THE DRILLERS METHOD THROUGH THE MGS.WE SIMULATED GETTING GAS BACKAT SURFACE BHP WAS MAINTAINED BY KEEPING COIL PRESSURE CONSTANT.ONCE BOTTOMS UP WAS ACHIEVED WE CIRCULATED ANOTHER 30 BBLS TO ENSURE THE RETURNS WERE CLEAN THEN SHUT DOWN AND GOT A GOOD NO FLOW CHECK. 08:40 - 08:55 0.25 DRILL P PROD1 PJSM TO LD DRILLING BHA,PUMP SLACK OUT AND CUT COIL 08:55 - 09:05 0.17 DRILL P PROD1 FLOW CHECK WELL 09:05 - 10:00 0.92 DRILL P PROD1 GOOD NO FLOW,TAG UP,REMOVE INJECTOR AND LD THE DRILLING BHA 10:00 - 10:30 0.50 DRILL P PROD1 BHA OOH BIT GRADE=1-1 CT/2 PILOT MILL CUTTERS SHOWING SOME WEAR AND 2 CHIPPED BUTTONS ON THE WING REMOVE THE BI-II UQC RUN 2 JTS OF PH6 IN THE WELL AND MU TO THE CTC AND PUMP THE ELINE SLACK OUT Printed 3/4/2013 1:09:23PM North America-ALASKA-BP Pa•e 160 Operation Summary Report Common Well Name:05-35 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date.2/2/2013 End Date:2/8/2013 X3-0133Y-C:DRILL(2,110,316.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72 Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:30 - 12:20 1.83 DRILL P PROD1 PUMP SLACK OUT 10:40 PU INJECTOR AND CHECK SLACK. PUMPED OUT 126' 11:15 WE STILL HAVE—210'OF SLACK STILL IN THE COIL 1145 STAB BACK ON AND PUMP 50 BBLS OF FRESH WATER TO SEE IF WE CAN GET ANYMORE 12:10 NOTABLE TO GET ANYMORE SLACK OUT OF THE REEL,WE WILL MAKE IT UP WITH PH6 TUBING 12:20 - 13:00 0.67 DRILL P PROD1 RU CUTTER AND CUT 100'OF PIPE FOR CHROME MANAGEMENT 13:00 - 13:30 0.50 DRILL P PROD1 MU BTTCTC 13:15 PULL TEST CTC TO 40K 13:30 - 13:50 0.33 DRILL P PROD1 STAB ON AND PT THE QTS 13:50 - 14:10 0.33 DRILL P PROD1 GOOD LOW&HIGH PT,BLEED OFF AND OPEN WELL TOA CLOSED CHOKE,NO PRESSURE,OPEN CHOKE,NO FLOW.PU INJECTOR AND SET ON LEGS • Printed 3/4/2013 1:09:23PM North America-ALASKA-BP Page 1 of 10 Operation Summary Report Common Well Name:05-35 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date:2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/8/2013 14:10 - 14:50 0.67 CASING P PROD1 RU FARR TONGS AND PREP FLOOR TO RUN LINER WALK THROUGH LINER WITH BTT HAND& DRILLER 14:50 - 15:10 0.33 CASING P PROD1 PJSM TO MU LINER 15:10 - 15:30 0.33 CASING P PROD1 MU LINER AS PER AMENDED PLAN FORWARD -AND LINER SUMMARY 15:30 - 16:10 0.67 CASING P PROD1 JT#3 WILL NOT DRIFT,PULL AND CHECK PIN CONNECTION.DRIFT IS TIGHT,LD JT#3,2 AND 1.I FORGOT TO PUMP 3/4"DRIFT BALL 16:10 - 16:40 0.50 CASING P PROD1 PU THE INJECTOR TO PUMP 3/4"DRIFT BALL 16:40 - 19:15 2.58 CASING P PROD1 STABBED ON,LOAD AND LAUNCH 3/4"DRIFT BALL.BREAK OFF INJECTOR AND RETRIEVE BALL. 19:15 - 20:00 0.75 CASING P PROD1 PRE JOB-SAFETY MEETING. RIG UP TO RUN LINER AND PREP FLOOR. 20:00 - 00:00 4.00 CASING P PROD1 RUN PRODUCTION LINER TO 1,973'. -PICK UP AND RUN IN WITH FLOAT EQUIPMENT INCLUDING GUIDE SHOE,FLOAT COLLAR TIMES 2,LATCH COLLAR AND STAGE -COLLAR. ..•RUN 39 JOINTS 2-7/8",6.4#,L-80,STL LINER WITH CEMENTRALIZERS. -CROSSOVER AND RUN 19 JOINTS 3-1/4", 6.6#,L-80,STL LINER WITH if CEMENTRALIZERS BY 3-3/16"TCII COUPLINGS. -CROSSOVER AND RUN 4 JOINTS 3-1/2",9.3#, L-80,STL LINER WITH OUT CEMENTRALIZERS. -BTT GEN 2 DEPLOYMENT SLEEVE WITH 4" GS PROFILE. -6 JOINTS 2-3/8"PH6 2/9/2013 00:00 - 01:00 1.00 CASING N SFAL PROD1 MOBILIZE 2 JOINTS OF PH6 FROM NORDIC 2 FOR LINER RUNNING.ONE JOINT HAS BAD THREADS AND THE 2 EXTRA JOINTS ARE BAD AS WELL.CREW HAD MEAL BREAK THEN READIED FLOOR FOR CONTINUATION OF LINER RUNNING. 01:00 - 01:30 0.50 CASING P PROD1 RUN PRODUCTION LINER TO 1,973'. -FINISH RUNNING LAST JOINT OF PH6 -BOT COIL CONNECTOR 01:30 - 02:45 1.25 CASING P PROD1 STAB AND MAKE UP INJECTOR.TEST QUICK TEST SUB TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH-PASS. 02:45 - 04:30 1.75 CASING P PROD1 RIH WITH LINER ON COIL TO 8,000'MD AND STOP AT FLAG.RUN AT 70 FPM PUMPING AT 0.30 BPM WITH 1045 PSI.DOWN WEIGHT 2K. AT 7,500'MD RUNNING AT 87 FPM PUMPING AT 0.25 BPM WITH 1540 PSI.DOWN WEIGHT 9.6K.PIT VOLUME 275 BBLS.MUD WEIGHT IN AND OUT 9.5 PPG.IA=0 PSI,OA=40 PSI. ADJUST DEPTH TO 10,206.6'AMINUS 17 FOOT CORRECTION.MANUAL COUNTER READS 8,017'AT FLAG.UP WEIGHT 42K, DOWN WEIGHT 14K. Printed 3/4/2013 1:09:59PM North America-ALASKA-BP PaRe2•f 1 tr Operation Summary Report Common Well Name:05-35 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date:2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project: Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/me:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum 05-35 @72.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 06:00 1.50 CASING P PROD1 RUN IN HOLE WITH LINER.RUNNING AT 31 FPM WITH 13K DOWN WEIGHT,UP WEIGHT 42K.PUMP AT 0.20 BPM WITH 1534 PSI.MUD WEIGHT IN AND OUT 9.5 PPG.AT 11,950'MD RUNNING AT 42 FPM WITH 8.5K DOWN. PUMPING AT 0.22 BPM WITH 1520 PSI. BOTTOM FLAG WAS MINUS 1 FOOT. 06:00 - 06:30 0.50 CASING P PROD1 TAG TD FEWTIMESAT SAME DEPTH,LINER IS ON BOTTOM WAIT FOR CREWS TO CHANGE OUT 06:30 - 06:40 0.17 CASING P PROD1 CREWS CHANGED OUT,PU TO VERIFY LINER IS ON BOTTOM.GOOD SOLID TAGS REEL IS ALREADY IN THE BALL DROP POSITION LOAD 5/8"BALL TO RELEASE FROM LINER 06:40 - 07:20 0.67 CASING P PROD1 BALL LAUNCHED 40 BBLS AWAY,REDUCE PUMP RATE(70%OF CT VOLUME) *****06:45 NOTIFIED STATE OF UPCOMING BOP TEST`**** 07:20 - 07:30 0.17 CASING P PROD1 BALL ON SEATAT47 BBLS PRESSURE UP TO 4300 PSI AND SELRT SHEARED,SHUT DOWN PUMP AND PU TO VERIFY WE ARE RELEASED PU WT=40KAT 10241',PU TO 10239'CLEAN, WE ARE RELEASED FROM THE LINER,RIH AND SET 15K DOWN 07:30 - 09:25 1.92 CASING P PROD1 DISPLACE WELL TO KCL *****08:10 BOP TEST WITNESS WAIVED BY CHUCK SCHEVE***** 09:25 - 10:10 0.75 CASING P PROD1 KCLBACKATSTARTKEEPINGRETURNS, PITS ARE ALMOST READY TO STAR THE CMT JOB 10:10 10:35 0.42 CASING P PROD1 PITS ARE READY TO GO,HOLD PJSM WITH ALL PERSONNEL TO PUMP CMT 10:35 11:10 0.58 CASING P PROD1 CHECK CMT LINE TO ENSURE ITS CLEAR SEND KCL TO CMT PUMP TRUCK 11:10 - 11:45 0.58 CASING P PROD1 LINEUP CMT PUMP DOWN THE COIL TO PUMP 3 BBLS PT CMT LINE TO 250 LOW AS PER WELL PLAN.HAVING TROUBLE GETTING A LOW TEST 11:45 - 12:15 0.50 CASING P PROD1 CANT GET A LOW TEST,MIGHT BE THERMAL COOLING,BLOW BACK LINEAND USE MINERAL OIL 12:15 - 12:20 0.08 CASING P PROD1 CMT PUMP ONLINE WITH MINERAL OIL TO FLUID PACK LINE 12:20 - 13:45 1.42 CASING P PROD1 PT CMT LINE TO 250 LOW PRESSURE STILL DROPPING OFF BELOW TEST CRITERIA STANDARDS LOOKS LIKE THERMAL COOLING 13:45 - 13:55 0.17 CASING P PROD1 GOOD LOW PT,PRESSURE UP TO>6000 psi 13:55 - 14:35 0.67 CASING P PROD1 GOOD HIGH PT,RD LVT AND BATCH CMT Printed 3/4/2013 1 09 59PM • North America-ALASKA-BP Page 3 of 10`9 Operation Summary Report Common Well Name:05-35 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date:2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:35 - 16:30 1.92 CASING P PROD1 14:30 CMT TO WEIGHT (941 PSI @ 1.5 BPM) LOSS RATE=0.0 BPM 14:30 SWAP COIL PUMP TO BIO 14:35 SHUT DOWN RIG PUMP AND LINE UP CMT PUMP DOWN THE COIL 14:40 ON LINE WITH CMT PUMP WITH 10 BBLS OF KCL TO PUMP LVT OUT 14:45 ON LINE WITH CMT,ZERO IN MM AT 14.0 PPG DENSITY 14:58 SHUT DOWN PUMP 23.5 BBLS AWAY. LINE UP TO GIVE BIO TO CMT TRUCK 15:00 ONLINE WITH RIG PUMP TO DISPLACE CMT 1MTH BIOZAN 15:08 CAUGHT CMTAT 26.5 BBLS AWAY 15:23 54.7 BBLS AWAY REDUCE RATE TO 1.5 BPM AS TO NOT SLAM SELRT WITH CMT 15:26 INCREASE RATE TO 2.0 BPM TO KEEP UP WITH CMT 15:33 70.3 BBLS AWAY CMT AT THE SHOE, ZERO OUT MM AND TAKE RETURNS TO PIT#2 15:37 78.7 BBLS SHUT DOWN THE PUMP TO LAUNCH PEE WEE DART AND SIDE EXHAUST 15:38 PU TO UP WT+13' (OUT MM AT 8.5 BBLS 1:1)NO LOSSES 15:40 STOP AT 12227',RIH SET BACK DOWN TO 12240'TO PUMP PEE WEE DART ON SEAT VOL= 15:41 PEE WEE DART ON SEAT (IN MM AT 78.8 BBLS OUT MM AT 8.7 BBLS) 15:42 PU TO PRESSURE DROP ON COIL AND SIDE EXHAUST 2 BBLS OF CMTAND 3 BBLS OF BIOZAN 15:53 5 BBLS PUMPED,OPEN BAKER CHOKE AND STACK WT BACK DOWN 15:54 RESET PUMP TRIPS BACKTO4500 PSI 15:59 ZERO IN MM AND PRESSURE UP TO SHEARLWP 16:01 LWP SHEARED AT 4300 PSI,DISPLACE LWPAT2.0BPM 16:04 RETURNS ARE STILL 1:1 16:06 12.1 BBLS AWAY REDUCE RATE TO BUMP PLUG 16:08 PLUG BUMPED AT 13.1 BBLS OUT MM AT 26.8 BBLS&HOLD TO VERIFY PLUG IS SET 16:09 SHUT DOWN ALL CHARGE PUMPS(27.4 BBLS GAIN IN PIT-5 BBLS=22.4 BBLS) 16:10 BLEED OFF COIL PRESSURE TO CHECK FLOATS 16:15 GOOD NO FLOW ON THE FLOATS, CLOSE THE BAKER CHOKE AND PRESSURE UP TO 700 PSI 16:15 PU TO PRESSURE DROP AND PUMP 5 BBLS OF BIOZAN AT 0.5 BPM •CMT NUMBERS 23.5 BBLS PUMPED-2 BBLS FOR SIDE EXHAUST=21.5 BBLS MAX BEHIND PIPE 8.5 BBLS BEFORE SIDE EXHAUST 12.4 BBLS AFTER SIDE EXHAUST 20.9 BBLS OF CMT BEHIND PIPE BASED ON OUT MM Printed 3/4/2013 1:09:59PM • North America-ALASKA-BPxti Page a of 10 Operation Summary Report Common Well Name.05-35 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date:2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 18:30 2.00 CASING P PROD1 5 BBLS CONTAMINATION OUT,POOH MAINTAINING 0.5 BPM RETURNS. 18:30 - 19:00 0.50 CASING P PROD1 STOP AT BHA BELOW BOP AND FLOW CHECK WELL-STATIC.PREP FLOOR FOR LAYING DOWN BHA.HOLD PJSM. 19:00 - 20:00 1.00 CASING P PROD1 LAY DOWN LINER RUNNING TOOLS AND BHA TOOLS OK ON INSPECTION.ONLY 6'OF ELINE,WILL RUN SAME 7 JOINTS OF PH6 TO -AVOID PROBLEMS ON CLEAN OUT RUN. 20:00 - 00:00 4.00 EVAL P PROD1 HOLD PRE JOB SAFETY MEETING WITH LOGGING CREWAND RIG CREW.MAKE UP CLEAN OUT LOGGING RUN BHA.KNOCK OUT SCALE ON EACH STAND AND CIRCULATE OUT SCALE EVERY 11 STANDS. RUN IN TO 1,500'MD. 2/10/2013 00:00 - 02:00 2.00 EVAL P OTHCMP MAKE UP CLEAN OUT LOGGING RUN BHA. KNOCK OUT SCALE ON EACH STAND AND CIRCULATE OUT SCALE EVERY 11 STANDS. RUN IN TO 2,457'MD. 02:00 - 02:30 0.50 EVAL P OTHCMP STAB INJECTOR AND MAKE UP TO BHA. MAKE UP QUICK TEST SUB AND TEST TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH-PASS. 02:30 - 04:30 2.00 EVAL P OTHCMP RIH WITH CLEAN OUT,LOGGING ASSEMBLY TO 9,300'MD. RUN AT 55 FPM WITH 1K DOWN. PUMP AT 0.25 BPM WITH 245 PSI.MUD WEIGHT IN 9.1 PPG,OUT 8.9 PPG.AT 7,000' MD RUNNING AT 70 FPM WITH 9K DOWN WEIGHT.PUMP AT 0.2 BPM WITH 280 PSI. 04:30 - 06:00 1.50 EVAL P OTHCMP STOPAT9,300'MD ABOVE FIRST X NIPPLE IN COMPLETION TUBING AT 9,371'MD.LOG DOWN AT 40 FPM WITH 12K DOWN WEIGHT. STRINGER AT 10,487'MD.CLEAN UP WITH NO PROBLEMS.PULL UP TO 10,450'MD AND CONTINUE LOGGING.RUN IN AT 40 FPM PUMPING AT 1.3 BPM INSIDE LINER WITH 1750 PSI AND 14K DOWN.TAG UP AT 12,245' MD WITH 4K DOWN.PULL UP 50'WITH 46K UP WEIGHTAND GO BACK DOWN FORA SECOND CONFIRMATION TAG AT 12,245'MD. 06:00 - 07:00 1.00 EVAL P OTHCMP START PERFORATION PILL DOWN COIL WHILE SLOWLING PULLING UP HOLE AT4 FPM PUMPING AT 1.55 BPM WITH 2000 PSI. WORK DOWN TO TAG UP ON BOTTOM AS PERF PILL EXITS BHA.CHASING PERF PILL 1%EXTRA SLICK KCL WITH 0.6%SAFE LUBE. PUMP 17 BBLS OF PERF PILL TAKING TOP OF PERF 283'INTO 4-1/4"TUBING. 07:00 - 07:25 0.42 EVAL P OTHCMP PERF PILL AT MILL,PU TO START LOG PASS UP 07:25 - 07:45 0.33 EVAL P OTHCMP STOP AT 10157'TO PAINTAN EOP FLAG FOR THE PERF RUN.WHITE EOP FLAG=7700' 07:45 - 07:55 0.17 EVAL P OTHCMP 9300'STOP LOGGING AND FLOW CHECK WELL 07:55 - 09:00 1.08 EVAL P OTHCMP GOOD NO FLOW CHECK,POOH at 90% DISPLACING 9.5 PPG KCL OUT WITH 8.5 PPG KCL 09:00 - 09:30 0.50 EVAL P OTHCMP PJSM TO STAND BACK CSH&LD LOGGING AND CLEAN OUT BHA 09:30 - 09:40 0.17 EVAL P OTHCMP FLOW CHECK WELL Printed 3/4/2013 1:09:59PM • • North America-ALASKA-BPS` Operation Summary Report Common Well Name:05-35 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date:2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35©72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:40 - 11:30 1.83 EVAL P OTHCMP GOOD NO FLOW,TAG UP,REMOVE INJECTOR AND LD THE PH6 11:30 - 12:45 1.25 EVAL P OTHCMP WET STRING LOAD 1/2"BALL TO OPEN CIRC SUB,CIRC SUB SHEARED AT 2300 PSI,STAND BACK CSH 12:45 - 13.05 0.33 EVAL P OTHCMP PJSM WITH MEM LOGGER TO LD LOGGING CARRIER 13:05 - 13:45 0.67 EVAL P OTHCMP LD CARRIER, 1 STAND,MOTOR AND MILL 13:45 - 14:25 0.67 EVAL P OTHCMP STAB INJECTOR ON WELL TO JET STACK PRIOR TO OPENING FOR INSPECTION 14:25 - 14:35 0.17 EVAL P OTHCMP REMOVE INJECTOR AND SET ON LEGS 14:35 - 15.00 0.42 EVAL P OTHCMP CMT UCA IS AT 2009 PSI AT 14:13 THIS AFTERNOON TEST LINER LAP AS PER PLAN FORWARD 15:00 - 15:55 0.92 EVAL P OTHCMP START LAP TEST VOL START AT 194.0 BBLS GOOD LOW PT 253 PSI HELD LIKEA ROCK BRING IT UP TO HIGH 15:55 - 16:10 0.25 EVAL P OTHCMP HIGH TEST START PRESSURE IS 2424 PSI AFTER FIRST 15 MIN WE LOST 22 PSI WE CAN ONLY LOOSE 11 PSI IN HT 2ND 15 MIN LOST 7 PSI IN THE SECOND 15 MIN FOR A PASSING LAP TEST TOTAL PRESSURE LOSS WAS 29 PSI IN 30 MIN NOTIFIED WTLAND DRLG SUPT AND WE HAVE PERMISSION TO CONTINUE OUR OPERATIONS 16:10 - 16:50 0.67 EVAL P OTHCMP RU TO PERFORM LEAK TIGHT TESTAS PER THE WELLPLAN TO TEST OUR BARRIERS FOR BREAKING CONTAINMENT 16:50 - 22:30 5.67 EVAL P OTHCMP GOOD LEAK TIGHT TEST,CLOSE SSV AND MONITOR WING FOR FLOW FROM RESERVOIR/MASTER GOOD NO FLOW FROM RESERVOIR,RU IA SENSOR TO MONITOR CAVITY PRESSURE WHILE INSPECTING RAMS DRAIN STACK THEN START OPENING DOORS INSPECT RAMS-NO FINDINGS Printed 3/4/2013 1:09:59PM • North America-ALASKA-BP Pa e 6 of 10 Operation Summary Report Common Well Name:05-35 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date:2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 BOPSUR P OTHCMP HOLD PJSM.TEST BOP AND ANNULAR PREVENTER TO 250 PSI LOWAND 3500 PSI HIGH AS PER AOGCC AND BP REQUIREMENTS.TEST WITNESS WAIVED BY CHUCK SCHEVE WTH AOGCC.TEST WITNESSED BY TOURPUSHER AND WSL. TEST UPPER AND LOWER 2-3/8"COMBIS AND -2-3/8"X 3-1/2"VBR'S WTH 2-3/8"TEST JOINT. ALL RAMS CLOSED WITHIN 2 SECONDS AND THE ANNULAR PREVENTER CLOSED IN 4 SECONDS.TESTED KILL AND CHOKE HCR, CHOKE MANIFOLD AND HYDRAULIC CHOKE. TESTED ALL VISUAL AND AUDIBLE ALARMS. PERFORMED DRAWDOWN TEST ON ACCUMULATOR.STARTING PRESSURE 3100 PSI,FINAL PRESSURE AFTER FUNCTION 2200 PSI. -200 PSI IN 23 SECONDS -FULL RECOVERY IN 87 SECONDS -3 NITROGEN BOTTLES WITH AN AVERAGE OF 1900 PSI. 2/11/2013 00:00 - 05:30 5.50 BOPSUR P OTHCMP HOLD PJSM.TEST BOP AND ANNULAR PREVENTER TO 250 PSI LOWAND 3500 PSI HIGH AS PER AOGCC AND BP REQUIREMENTS.TEST WITNESS WAIVED BY CHUCK SCHEVE WITH AOGCC.TEST WITNESSED BY TOURPUSHER AND WSL. TEST UPPER AND LOWER 2-3/8"COMBIS AND 2-3/8"X 3-1/2"VBR'S WITH 2-3/8"TEST JOINT. ALL RAMS CLOSED WITHIN 2 SECONDS AND THE ANNULAR PREVENTER CLOSED IN 4 SECONDS.TESTED KILL AND CHOKE HCR, CHOKE MANIFOLD AND HYDRAULIC CHOKE. TESTED ALL VISUAL AND AUDIBLE ALARMS. PERFORMED DRAWDOWN TEST ON ACCUMULATOR.STARTING PRESSURE 3100 PSI,FINAL PRESSURE AFTER FUNCTION 2200 PSI. -200 PSI IN 23 SECONDS -FULL RECOVERY IN 87 SECONDS -3 NITROGEN BOTTLES WITH AN AVERAGE OF 1900 PSI. 05:30 - 06:30 1.00 BOPSUR P OTHCMP RIG DOWN BOP TEST EQUIPMENT.CLEAR AND CLEAN FLOOR.VERIFY NO PRESSURE ON WELL,OPEN UP WELL TO CLOSED CHOKE.NO PRESSURE ON CHOKE.OPEN CHOKE,CIRCULATED THROUGH COIL, RETURNS IMMEDIATELY.CIRCULATE TO CHANGE OVER FLUID IN COIL WHILE RIGGING UP TO POP INJECTOR.SHUT DOWN,SET BACK INJECTOR. 06:30 - 09:00 2.50 PERFOB P OTHCMP RED WINCH CABLE NEEDS TO BE CHANGED OUT 09:00 - 09:20 0.33 PERFOB P OTHCMP PJSM TO RUN 1"CSH STRING IN WELLAND LAY DOWN TO SEND BACK TO BAKER 09:20 - 09:45 0.42 PERFOB N DPRB OTHCMP MU CSH STRING 09:45 - 10:00 0.25 PERFOB N DPRB OTHCMP 1ST STAND IN THE HOLE IS TAGGING UP-30' IN THE HOLE,NOZZLE HAS SLUSH ON IT Printed 3/4/2013 1:09:59PM • North America-ALASKA-BP 'aee 7 of 1,1 Operation Summary Report - ..„ Common'.Nell Name:05-35 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date 2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 • Active datum:05-35 @72.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 10:30 0.50 PERFOB N DPRB OTHCMP PU INJECTOR TO JET ICE PLUG NOTIFY DRLG SUPT WITH PLAN FORWARD TO JET ICE PLUG TAKING RETURNS THROUGH THE CHOKE holding—200 PSI 10:30 - 11:45 1.25 PERFOB N DPRB OTHCMP RIH CIRC AT MAX RATE HOLDING 150-200 PSI ON THE CHOKE AT 35'WE SAWA DROP IN WHP AND OUT - RATE AS WELL.LOOKS LIKE WE MADE IT THOUGH THE ICE PLUG BUT WE ARE GOING TO RIH TO 2500'TO ENSURE THE WELL IS CLEAR AND WARMED UP 11:45 - 11:50 0.08 PERFOB N DPRB PERFOB N DPRB OTHCMP FLOW CHECK VVELL 11:50 - 12:05 0.25 OTHCMP GOOD NO FLOW,REMOVE INJECTOR AND LD .NOZZLE BHA 12:05 - 12:15 0.17 PERFOB N DPRB OTHCMP SET INJECTOR ON ITS LEGS 12:15 - 13:45 1.50 PERFOB P OTHCMP MU 1"CSH STRING 13:45 - 14:45 1.00 PERFOB P OTHCMP ALL 1"CSH RAN,.MU HEAD PIN AND CIRC FRESH WATER AROUND TO WASH THE KCL OFF 14:45 - 15:20 0.58 PERFOB P OTHCMP START PUMPING WATER 15:20 - 19:00 3.67 PERFOB P OTHCMP SHUT DOVVN PUMP AND RD THE HEAD PIN. .PULL OUT OF HOLE AND LAY DOWN CS HYDRIL. 19:00 - 21:00 2.00 PERFOB P OTHCMP PICK UP PERFORATING TOOLS.LAY DOWN 1 PERF GUN RIG UP TO MAKE UP AND RIH WITH PERORATION ASSEMBLY. 21:00 - 23:00 2.00 PERFOB P OTHCMP MAKE UP 65 PERF GUNS AND RIH VVITH A TOTAL PERF ASSEMBLY OF 1,394.02'. 23:00 - 00:00 1.00 PERFOB P OTHCMP MAKE UP BHA#14 PERFORATING RUNNING ASSEMBLY WITH E-FIRING HEAD TO 2,219.02'. HOLD KICK WHILE TRIPPING DRILL. 2/12/2013 00:00 - 01:00 1.00 PERFOB P OTHCMP STAB INJECTOR.MAKE UP QUICK TEST SUB. TEST TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH-PASS. 01.00 - 02:30 1.50 PERFOB P OTHCMP RUN IN HOLE VVITH PERF ASSEMBLYAT 73 FPM PUMPING AT 0.36 BPM WITH 80 PSI. DOWN WEIGHT 1.5K MUD WEIGHT IN AND OUT 8.4 PPG.PIT VOLUME 289 BBLS.IN RATE 0.35 BPM,OUT RATE 0.9 BPM.AT 7,500'MD RUNNING AT 90 FPM,PUMPING AT 0.35 BPM, OUT RATE 0.8 BPM WITH 110 PSI.DOWN WEIGHT 12K VOLUME 315 BBLS.STOP AT FLAG DEPTH OF 7,700 MD AND ADD BHA OF 2,219.02'MD FORA DEPTH OF 9,919.02 MD. BIT DEPTH AT FLAG 9,924.54'MD. CORRECTION OF MINUS 5.52'MADE AND VERIFIED BY CTS AND TCP SPECIALISTS. 02 30 - 04:00 1.50 PERFOB P OTHCMP RUN IN HOLE VVITH PERF ASSEMBLYAT 77 FPM WITH 17K DOWN.PUMP AT 0.35 BPM WITH 120 PSI.MUD WEIGHT IN AND OUT 8.4 PPG.PIT VOLUME 328 BBLS.STOP AT TOP OF LINER AT 10,240'MD AND OBTAIN PARAMETERS.UP WEIGHT 40K,DOWN WEIGHT 18K.RIH IN HOLE WITH PUMPS OFF SO AS NOT TO DISPLACE PERF PILL LEFT IN HOLE.OUT MM RATE 0 29 AT 50 FPM Printed 3/4/2013 1 09 59PM North America ALASKA BP • Page 8 of 10 I • Operation Summary Report Common Well Name:05-35 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date:2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 06:15 2.25 PERFOB N HMAN OTHCMP RIH TO PBTD OF 12,240,MD TAG UP EARLYAT 12,175 MD.ATTEMPT TO PASS BY AND TAG UP 2 MORE TIMES.PULL UP HOLE SLOWLY WHILE CHECKING NUMBERS.FOUND A DISCREPANCY ON THE TALLY WITH THE NUMBERS SHOWING 62.59'OF CS HYDRIL WAS LEFT OUT OF THE TALLY LENGTH. VERIFIED NUMBERS IN THE TALLY,NUMBER OF THREAD PROTECTORS AND NUMBERS RUN BY RIG CREW,ALL SHOWING WE ARE TAGGING UP ON BOTTOM.WE WERE FAR ENOUGH UP HOLE THAT WE PULLED BACK TO FLAG MARKER AND RESET DEPTH TO ACTUAL BHA LENGTH.CORRECTION WAS PLUS 65.23'.RIH AT 27 FPM WITH 18K DOWN WEIGHT.SHUT DOWN PUMPS AT LINER TOP OF 10,278'MD.UP WEIGHT 40K. 06:15 - 06:20 0.08 PERFOB P OTHCMP TAG PBTD 12241',PU TO RETAG UP 43K,TAG SAME DEPTH,PU TO 43K AND STOP TO CORRECT DEPTH TO PBTD OF 12239.5' 06:20 - 06:30 0.17 PERFOB P OTHCMP PU TO 12234'(4'BELOW BOTTOM SHOT DEPTH)AND PRACTICE PUMP SEQUENCE 06:30 - 06:40 0.17 PERFOB P OTHCMP START PUMP SEQUENCE TO FIRE GUNS 06:40 - 07:45 1.08 PERFOB P OTHCMP GUNS FIRED ON DEPTH,CLOSE CHOKE UNTIL VVHP IS OBSERVED WHP IS CLIMBING AFTER PUMPING 3 BBLS OPEN CHOKE AND MAINTAIN POSITIVE OUT FLOW WHILE MAINTAINING—150 PSI 07:45 - 07:55 0.17 PERFOB P OTHCMP ABOVE TOL,FLOW CHECK WELL 07:55 - 09:30 1.58 PERFOB P OTHCMP GOOD NO FLOW,POOH 09:30 - 09:40 0.17 PERFOB P OTHCMP AT SURFACE,FLOW CHECK WELL 09:40 - 10:30 0.83 PERFOB P OTHCMP GOOD NO FLOW,TAG UP,REMOVE INJECTOR,LD PH6 TUBING AND STBK CSH 10:30 - 11:00 0.50 PERFOB P OTHCMP STOP AT MARKER JOINT,TCP ENGINEER ON THE FLOOR,CONTINUE PULLING CSH 11:00 - 11:20 0.33 PERFOB P OTHCMP PJSM WITH TCP ENGINEER TO LD SPENT GUNS 11:20 - 15:00 3.67 PERFOB P OTHCMP RU FARR TONGS TO BO PERF GUNS,LD SPENT GUNS. ALL SHOTS FIRED. 15:00 - 17:00 2.00 PERFOB P OTHCMP RD HANDLING EQUIPMENT&LOAD OUT SPENT GUNS. LRS HEATING DIESEL TO 80-DEG. 17:00 - 17:30 0.50 WHSUR P OTHCMP MU FREEZE PROTECTION NOZZLE BHAW/ DBPV. STAB ON WELL&TEST QTS TO 250-PSI/ 3500-PSI FOR 5-MIN PER TEST. GOOD TESTS. 17:30 - 18:30 1.00 WHSUR P OTHCMP RIH WITH NOZZLE BHA. CIRCULATE BOTTOMS UP AT 2500'WHILE CREW CONDUCTS CHANGEOUT AND WALKAROUND. Printed 3/4/2013 1:09:59PM • North America-ALASKA BP P 9 of 1!.; Operation Summary Report Common Well Name 05-35 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date:2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project Prudhoe Bay Site:PB DS 05 Rig Name/No.:NORDIC 1 Spud Date/Time:6/1/1991 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 20:00 1.50 WHSUR P OTHCMP PJSM ON RIGGING UP AND FREEZE PROTECTING WITH LITTLE RED HOT OIL SERVICE. RIG UP LITTLE RED TO RIG. PUMP 54 BBLS DIESEL FREEZE PROTECT. PULL UP HOLE WITH DIESEL ABOVE NOZZLE ASSEMBLY TO FREEZE PROTECT ONE-TO-ONEAS THE BHA IS PULLED TO SURFACE. DIESEL TO SURFACE,DIVERT RETURNS,DOWN ON PUMPS AND FLOW CHECK. ALL GOOD. 20:00 - 22:00 2.00 DHB P POST PULL BHA TO SURFACE. POP OFF AND LD BHA. STAND BACK INJECTOR. GREASE TREE VALVES AND CYCLE. INSTALL BACK PRESSURE VALVE. SHUT IN MASTER,SWAB, AND SURFACE SAFETY VALVES. CONDUCT LEAK TIGHT TEST. ALL GOOD. CONTINUE TO MONITOR WELL BETWEEN SWAB AND SSV. 22:00 - 00:00 2.00 RIGD P POST PJSM WITH NITROGEN CREW. RIG UP NITROGEN UNIT TO RIG. PRESSURE TEST LINES TO 250/3500 PSI. PUMP FRESH WATER FOLLOWED BY CORROSION INHIBITOR PICKLING PILLAND THEN METHANOL SPEAR. 2/13/2013 00:00 - 01:00 1.00 RIGD P POST BLOW DOWN REEL WITH NITROGEN. VERIFY GOOD BLOWDOWN. RIG DOWN NITROGEN UNIT. STAGING EQUIPMENT FOR RIG MOVE. PLACE HEATERS ON MOVING SYSTEM. 01:00 - 04:00 3.00 RIGD P POST PREP COIL AND REEL TO PULLACROSS. INSTALL GRAPPLE TO COIL,PULL TEST GRAPPLE. PULL COIL BACK TO REEL HOUSE AND SECURE WITH SHIPPING BAR. BREAK OUT INNER REEL IRON AND PREPARE TO LOWER REEL DOWN. INSPECT BRIDGE CRANE. 04:00 - 06:00 2.00 RIGD P POST PJSM WITH CREW,CH2MHILL DRIVERS,SITE CONTROL ON EXCHANGING REELS. EMPHASIS ON COMMUNICATION, PERSONNEL PLACEMENT,SPOTTERS. POSITION TRUCKS,LOWER AND SECURE 2-3/8"REEL. INSPECT,LUBRICATE DRIVE PINS. POSITION REEL UNDER DOOR,PICK REEL AND SECURE TO HYDRAULIC DRIVE PINS. SIMOPS:MOVING TRAILERS FROM DS 5 TO DS 7. 06:00 - 10:00 4.00 RIGD P POST OPEN BOPE DOORS&INSPECT BOPE. CHANGE OUT RAMS FOR 2"COIL. SIMOPS=INSTALL INNER REEL IRON IN 2" REEL. -NOTIFY AOGCC VIA STATE WEBSITE PAGE WITH THE 24-HOUR NOTIFICATION FOR THE UPCOMING BOP TEST AT 0710 HOURS 10:00 - 11:30 1.50 RIGD P POST RD GOOSENECK&CHANGE OUT ROLLERS FOR 2". REINSTALL GOOSENECK. SIMOPS-EMPTY&CLEAN PITS. 11:30 12:30 1.00 RIGD P ■- POST CHANGE OUT BRASS IN PACKOFF. DRESS FOR 2"COIL. SIMOPS-MOVE SAT CAMP TO DS 7. Printed 3/4/2013 1:09:59PM North America-ALASKA-BP Operation Summary Report Common Well Name:05-35 a �3 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/8/2013 End Date:2/13/2013 X3-0133Y-C:DRILL(1,350,695.00) Project:Prudhoe Bay Site:PB DS 05 Rig Name/No NORDIC 1 Spud DateTme:6/1/1991 12:00:00AM Rig Release. Rig Contractor:NORDIC CALISTA UWI:500292217200 Active datum:05-35 @72.Oft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) — 12:30 - 17:30 5.00 BOPSUR P POST VAC OUT&RD"HOT TUB". ND BOP STACK. BARRIERS FOR ND ARE DUAL LEAK TIGHT TESTED TREE VALVES PER WELL PROGRAM CRITERIA. SIMOPS-SET INJECTOR BACK ON LEGS& CHANGE OUT GRIPPER BLOCKS TO 2". 17:30 - 18:00 0.50 BOPSUR P POST INSTALL TREE CAP AND PRESSURE TEST ACCORDING TO CRITERIA OUTLINED IN WELL PLAN. GOOD TEST. RIG RELEASE AT 1800 HOURS. OPEN VALVES,PUMP METHANOL TO FILL TREE AND PAST BACK PRESSURE VALVE.NO PRESSURE FROM WELL WITH VALVES OPEN. CLOSE VALVES ONCE TREE FILLED WITH METHANOL. CONTINUE WITH OPERATIONS TO MOVE RIG. FIELD SUPERINTENDENT ON SITE,DRILLER AND TOURPUSHER CONDUCTING ROUTE DRIVE. _ Printed 3/4/2013 1:09:59PM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 05 05-35 500292217200 05-35B Survey: MWD Survey Report - Geographic 14 February, 2013 Qbp IM id I BAKER HUGHES Survey Report-Geographic 0 by 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 05-35 Project: Prudhoe Bay TVD Reference: 05-35A @ 62.85usft(Nabors 7ES) Site: PB DS 05 MD Reference: 05-35A©62.85usft(Nabors 7ES) Well: 05-35 North Reference: True Wellbore: 05-35B Survey Calculation Method: Minimum Curvature Design: 05-35B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 05,TR-11-15 Site Position: Northing: 5,947,204.70 usft Latitude: 70°15'35.696 N From: Map Easting: 697,428.91 usft Longitude: 148°24'14.42 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.50° Well 05-35 API No.500292217200 Well Position +N/-S 0.00 usft Northing: 5,949,121.63 usft Latitude: 70°15'54.605 N +El-W 0.00 usft Easting: 697,189.82 usft Longitude: 148°24'19.92 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 34.20 usft Wellbore 05-35B API no. 500292217202 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2012 1/21/2013 20.72 81.03 57,635 Design 05-35B Audit Notes: 1 Version: Phase: ACTUAL Tie On Depth: 10,462.58 Vertical Section: Depth From(TVD) +N/-S +El-W Direction (usft) (usft) (usft) (°) 28.65 0.00 0.00 288.53 Survey Program Date: 2/8/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 90.85 3,790.85 1 :Schlumberger GCT multishot(05-35) GCT-MS Schlumberger GCT multishot 3,861.00 4,012.64 05-35A Srvy 1 Inc+Trend(05-35A) INC+TREND Inclinometer+known azi trend 4,108.98 9,617.29 05-35A Srvy 2 MVVD+IFR+MS(05-35A) MWD+IFR+MS MWD+IFR+Multi Station 9,699.32 10,462.58 05-35A Srvy 3 MWD+IFR+MS(05-35A) MWD+IFR+MS MWD+IFR+Multi Station 10,485.00 12,259.00 MWD(05-35B) MWD MWD-Standard 2/14/2013 4:03:52PM Page 2 COMPASS 5000.1 Build 61 NMI BAKER HUGHES Survey Report-Geographic : bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 05-35 Project: Prudhoe Bay TVD Reference: 05-35A @ 62.85usft(Nabors 7ES) Site: PB DS 05 MD Reference: 05-35A @ 62.85usft(Nabors 7ES) Well: 05-35 North Reference: True Wellbore: 05-35B Survey Calculation Method: Minimum Curvature Design: 05-35B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,462.58 66.17 330.27 8,876.62 1,002.44 -4,375.68 5,950,009.07 692,789.63 70°16'4.452 N 148°26'27.28 W 10,485.00 68.07 331.13 8,885.34 1,020.45 -4,385.79 5,950,026.81 692,779.05 70°16'4.629 N 148°26'27.58 W 10,516.06 70.20 329.45 8,896.40 1,045.66 -4,400.18 5,950,051.62 692,764.01 70°16'4.877 N 148°26'28.00 W 10,549.00 75.71 327.73 8,906.05 1,072.52 -4,416.59 5,950,078.05 692,746.90 70°16'5.141 N 148°26'28.47 W 10,579.94 78.11 326.16 8,913.06 1,097.77 -4,433.03 5,950,102.86 692,729.81 70°16'5.389 N 148°26'28.95 W 10,610.26 80.29 324.67 8,918.74 1,122.29 -4,449.93 5,950,126.92 692,712.27 70°16'5.630 N 148°26'29.45 W 10,640.86 83.95 321.32 8,922.94 1,146.49 -4,468.17 5,950,150.63 692,693.40 70°16'5.868 N 148°26'29.98 W 10,671.72 87.88 319.33 8,925.14 1,170.17 -4,487.82 5,950,173.79 692,673.14 70°16'6.101 N 148°26'30.55 W 10,701.77 90.06 316.60 8,925.68 1,192.48 -4,507.93 5,950,195.57 692,652.45 70°16'6.320 N 148°26'31.14 W 10,729.34 90.52 313.55 8,925.54 1,212.00 -4,527.40 5,950,214.57 692,632.48 70°16'6.512 N 148°26'31.70 W 10,759.26 89.48 309.77 8,925.54 1,231.88 4,549.75 5,950,233.86 692,609.62 70°16'6.707 N 148°26'32.35 W 10,789.28 89.69 305.28 8,925.75 1,250.17 -4,573.55 5,950,251.51 692,585.35 70°16'6.887 N 148°26'33.05 W 10,819.28 88.96 301.20 8,926.11 1,266.60 -4,598.64 5,950,267.29 692,559.84 70°16'7.049 N 148°26'33.78 W 10,849.34 89.57 296.88 8,926.49 1,281.19 -4,624.91 5,950,281.18 692,533.20 70°16'7.192 N 148°26'34.54 W 10,879.40 90.37 293.04 8,926.51 1,293.87 -4,652.16 5,950,293.14 692,505.63 70°16'7.316 N 148°26'35.34 W 10,909.65 90.74 288.62 8,926.22 1,304.63 -4,680.42 5,950,303.15 692,477.10 70°16'7.422 N 148°26'36.16 W 10,939.43 90.25 290.08 8,925.96 1,314.49 -4,708.52 5,950,312.28 692,448.75 70°16'7.519 N 148°26'36.98 W 10,969.47 90.03 294.23 8,925.89 1,325.82 -4,736.33 5,950,322.87 692,420.65 70°16'7.630 N 148°26'37.79 W 10,999.48 91.23 298.78 8,925.56 1,339.21 -4,763.18 5,950,335.55 692,393.47 70°16'7.762 N 148°26'38.57 W 11,030.45 90.34 303.51 8,925.13 1,355.22 -4,789.67 5,950,350.86 692,366.56 70°16'7.919 N 148°26'39.34 W 11,060.44 89.08 307.30 8,925.28 1,372.59 -4,814.11 5,950,367.59 692,341.68 70°16'8.090 N 148°26'40.05 W 11,090.30 88.44 311.86 8,925.93 1,391.61 -4,837.12 5,950,385.99 692,318.19 70°16'8.276 N 148°26'40.72 W 11,120.09 88.71 315.27 8,926.67 1,412.13 -4,858.69 5,950,405.94 692,296.08 70°16'8.478 N 148°26'41.35 W 11,150.10 90.18 319.95 8,926.96 1,434.29 -4,878.92 5,950,427.56 692,275.28 70°16'8.696 N 148°26'41.94 W 11,180.10 91.13 323.33 8,926.62 1,457.80 -4,897.53 5,950,450.58 692,256.06 70°16'8.927 N 148°26'42.48 W 11,210.28 88.16 326.81 8,926.81 1,482.54 -4,914.81 5,950,474.85 692,238.15 70°16'9.170 N 148°26'42.98 W 11,240.20 90.12 329.07 8,927.25 1,507.89 -4,930.68 5,950,499.78 692,221.61 70°16'9.419 N 148°26'43.45 W 11,275.77 91.87 325.88 8,926.64 1,537.87 -4,949.80 5,950,529.25 692,201.71 70°16'9.714 N 148°26'44.00 W 11,304.48 91.41 322.48 8,925.81 1,561.14 -4,966.60 5,950,552.07 692,184.32 70°16'9.943 N 148°26'44.49 W 11,335.08 89.75 318.15 8,925.50 1,584.68 -4,986.13 5,950,575.09 692,164.18 70°16'10.174 N 148°26'45.06 W 11,364.90 91.72 314.28 8,925.12 1,606.20 -5,006.76 5,950,596.06 692,142.99 70°16'10.386 N 148°26'45.66 W 11,403.73 91.13 311.33 8,924.16 1,632.58 -5,035.23 5,950,621.68 692,113.84 70°16'10.645 N 148°26'46.49 W 11,430.69 88.83 308.32 8,924.17 1,649.84 -5,055.93 5,950,638.39 692,092.69 70°16'10.815 N 148°26'47.10 W 11,461.14 89.54 303.82 8,924.60 1,667.76 -5,080.54 5,950,655.66 692,067.63 70°16'10.991 N 148°26'47.81 W 11,490.85 89.17 299.58 8,924.93 1,683.37 -5,105.81 5,950,670.60 692,041.96 70°16'11.144 N 148°26'48.55 W 11,520.85 88.59 295.21 8,925.52 1,697.17 -5,132.43 5,950,683.70 692,014.98 70°16'11.280 N 148°26'49.32 W 11,550.87 88.16 290.11 8,926.37 1,708.72 -5,160.12 5,950,694.52 691,987.01 70°16'11.393 N 148°26'50.13 W 11,580.75 88.59 285.82 8,927.22 1,717.93 -5,188.52 5,950,702.99 691,958.38 70°16'11.484 N 148°26'50.96 W 11,611.03 90.12 281.63 8,927.56 1,725.11 -5,217.93 5,950,709.39 691,928.79 70°16'11.554 N 148°26'51.81 W 11,640.73 91.81 278.35 8,927.06 1,730.27 -5,247.17 5,950,713.78 691,899.43 70°16'11.604 N 148°26'52.66 W 11,670.67 92.70 274.47 8,925.88 1,733.61 -5,276.89 5,950,716.34 691,869.63 70°16'11.637 N 148°26'53.53 W 11,700.83 92.58 269.27 8,924.49 1,734.59 -5,306.99 5,950,716.53 691,839.51 70°16'11.647 N 148°26'54.41 W 11,731.11 93.01 265.05 8,923.01 1,733.09 -5,337.19 5,950,714.24 691,809.37 70°16'11.632 N 148°26'55.28 W 11,760.61 91.72 266.42 8,921.80 1,730.90 -5,366.58 5,950,711.28 691,780.04 70°16'11.610 N 148°26'56.14 W 11,790.96 91.01 270.57 8,921.07 1,730.10 -5,396.91 5,950,709.69 691,749.75 70°16'11.602 N 148°26'57.02 W 11,818.21 90.31 274.90 8,920.76 1,731.40 -5,424.12 5,950,710.28 691,722.52 70°16'11.614 N 148°26'57.82 W 11,849.37 89.82 279.12 8,920.72 1,735.20 -5,455.04 5,950,713.27 691,691.51 70°16'11.652 N 148°26'58.72 W 11,879.45 90.18 283.55 8,920.72 1,741.11 -5,484.52 5,950,718.40 691,661.88 70°16'11.709 N 148°26'59.57 W 11,909.23 90.21 287.78 8,920.62 1,749.15 -5,513.19 5,950,725.69 691,633.02 70°16'11.788 N 148°27'0.41 W 11,940.70 89.08 292.33 8,920.82 1,759.94 -5,542.74 5,950,735.70 691,603.19 70°16'11.894 N 148°27'1.27 W 11,970.60 89.60 296.62 8,921.16 1,772.33 -5,569.95 5,950,747.37 691,575.67 70°16'12.016 N 148°27'2.06 W 12,002.13 90.00 301.22 8,921.27 1,787.57 -5,597.54 5,950,761.88 691,547.69 70°16'12.166 N 148°27'2.86 W 12,030.11 89.88 305.27 8,921.30 1,802.90 -5,620.94 5,950,776.60 691,523.91 70°16'12.316 N 148°27'3.55 W 12,061.77 89.75 309.99 8,921.40 1,822.23 -5,646.00 5,950,795.26 691,498.34 70°16'12.506 N 148°27'4.28 W 12,091.92 90.49 312.29 8,921.34 1,842.06 -5,668.71 5,950,814.49 691,475.13 70°16'12.701 N 148°27'4.94 W 2/14/2013 4:03.52PM Page 3 COMPASS 5000.1 Build 61 MA BAKER 'A RHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 05-35 Project: Prudhoe Bay TVD Reference: 05-35A @ 62.85usft(Nabors 7ES) Site: PB DS 05 MD Reference: 05-35A @ 62.85usft(Nabors 7ES) Well: 05-35 North Reference: True Wellbore: 05-35B Survey Calculation Method: Minimum Curvature Design: 05-35B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (^) (^) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 12,122.31 90.28 314.13 8,921.14 1,862.87 -5,690.85 5,950,834.71 691,452.44 70°16'12.905 N 148°27'5.58 W 12,151.32 90.86 310.66 8,920.85 1,882.43 -5,712.27 5,950,853.69 691,430.52 70°16'13.098 N 148°27'6.21 W 12,179.75 91.04 306.76 8,920.38 1,900.20 -5,734.45 5,950,870.88 691,407.89 70°16'13.272 N 148°27'6.85 W 12,209.55 90.09 302.98 8,920.08 1,917.23 -5,758.90 5,950,887.27 691,383.01 70°16'13.440 N 148°27'7.56 W 12,228.87 89.88 302.41 8,920.09 1,927.67 -5,775.15 5,950,897.27 691,366.48 70°16'13.542 N 148°27'8.04 W 12,259.00 89.88 302.41 8,920.15 1,943.82 -5,800.59 5,950,912.75 691,340.63 70°16'13.701 N 148°27'8.78 W 2/14/2013 4::03:52PM Page 4 COMPASS 5000.1 Build 61 Letter of Transmittal )t 91.3-� 1 BAKER Date: March 4, 2013 HUGHES a ? .J To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7`h Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): 14-02CL1 " 1S 01-17C 05-35AL2PB 1.05-35 : off. 13 " IT 07-29E — P-17L1 2.i \ ( • 06-02B — ( / .40 c.2 06-22BPB1, 06-22B is cp 06-24BPB 1, 06-24B A 90 Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge recei t of this data. receipt I / J RECEIVED BY: IP\ h .ijrj4 A/ '11441.Pte of Alaska AOGCC DATE: ww\��\�j���s THE STATE Alaska Oil and Gas � °fALAS ;A _ -_�,; Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue OF **P Anchorage, Alaska 99501-3572 ALAS Main: 907.279.1433 Fax: 907.276.7542 John McMullen Engineering Team Leader BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 05-35B BP Exploration(Alaska), Inc. Permit No: 213-018 Surface Location: 2323' FNL, 124' FWL, SEC. 32, T11N, R15E,UM Bottomhole Location: 95' FSL, 1552' FEL, SEC. 25, T11N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy '. Foerster Chair DATED this Lday of February, 2013. RECEIVED s STATE OF ALASKA ALA. OIL AND GAS CONSERVATION COME. ON FEB 0 5 2013 PERMIT TO DRILL 20 AAC 25.005 AOGCC 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil ❑Service-Winj ®Single Zone • 1 c.Specify if well is proposed for: ❑Drill ❑Lateral ❑Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone ❑Coalbed Gas ❑Gas Hydrates ®Redrill JO Reentry ❑Exploratory ❑Service-WAG ❑Service-Disp ❑Geothermal ❑Shale Gas 2.Operator Name: 5.Bond ®Blanket ❑Single Well 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193 • PBU 05-35B 3. Address 6.Proposed Depth: 12. Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 13235' • TVD 8864'ss ' Prudhoe Bay/Prudhoe Bay - 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028326•&028308 - 2323'FNL, 124'FWL, Sec. 32,T11 N, R15E, UM - Top of Productive Horizon: / 8.Land Use Permit: 13.Approximate Spud Date: 1157'FNL,673' FWL, Sec. 31,T11 N, R15E, UM February 4,2013 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 95' FSL, 1552'FEL,Sec.25 T11 N, R14E, UM 5051 32578' - 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 62.85' feet 15.Distance to Nearest Well Open Surface: x 697190 • y-5949122 • Zone- ASP4 GL Elevation above MSL: 34.2' feet to Same Pool: 355' - 16.Deviated Wells: Kickoff Depth: 10485' feet • 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3276 Surface: 2396 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 4-1/4" 3-1/2"x 3-1/4" 9.3#/6.6# L-80 STL/TC-II 2950' 10285' 8790'ss 13235' 8864'ss 150 sx Class'G' x 2-7/8" /6.5# /STL 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) 13000' 8894' None 12911' 8988' None Casing Length Size Cement Volume MD ND Conductor/Structural , 115' 20" 11 cu yds Coldset 115' • , 115' . Surface 3861' 9-5/8" 1141 sx CS III,300 sx'G';Top Job: 195 sx CS II 3861' 3760' Intermediate 9676' 7" 218 sx LiteCrete, 168 sx Class'G' 9676' 8335' Production Liner 3489' 4-1/2" 423 sx Class'G' 9510'- 12999' 8203'-8894' Perforation Depth MD(ft): 11290'- 12910' Perforation Depth ND(ft): 8938'-8898' 20.Attachments: ❑Property Plat ®BOP Sketch ®Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis ®Diverter Sketch ❑Seabed Report ®Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Guy Schwartz 2-/OS Date 22. I hereby certify that the foregoing is true and correct: Contact David Johnston,564-5985 Printed Name J n e Title Engineering Team Leader Email David.Johnston2 @bp.com Signature � Phone 564-4711 Date ?AA- Commission Use Only Permit To Drill ,-,/ , API Number: Permit Approv Date See cover letter for Number: .Z/_S C-! `` 50-029-22172-02-00 '2, 19 other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas [Jf Other: j contained shales: 0, f.7-5 f t o .3 5 O L) psi.i. Samples Req'd ❑Yes 6 No Mud Log Req'd: ❑�'es "No H2S Measures: [J'Yes �❑,�No Directional Survey Req'd: ❑'Yes ❑�o Spacing exception req'd: ❑Yes L/No inclination-only svy Req'd: ❑Yes I_J✓ No APPROVED BY APPROVED BY Z_Z5-- /, MISSIONER THE COMMISSION Date For 6 Fe i 1 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submi orm an Attachments In Duplicate v �„ v�F z Paz �i3 orm A?7_1 t1 To: Alaska Oil & Gas Conservation Commission From: David Johnston by CTD Engineer Date: February 4, 2013 Re: 05-35B Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack 05-35B from well 05-35A. The Nordic rig 1 was executing approved drilling program and permit to drill for 05-35AL2 when wellbore stability problems at the window forced a decision to plug back and start over. 05-35A was completed in September 2008. The A bore came on at marginal rates with minimal WC, and minimal gas. The well stayed around these production values until July-2011 when a slotted liner lateral was added to the 05-35A in an attempt to make it a more economical well to produce. The well had a few flush tests then settled out right back at the prior rates of 05-35A. the L1 lateral was drilled in very low net to gross sand, and the production trends agree with this. Rig Work: (Began on January 26, 2013) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Bull head kill the well with 1% 8.4 ppg KCI. 3. Set 4-'/2" TT flow through packer whipstock at -10,800' MD. (Below the new gas contact point). 4. Mill 3.80" window at 10,800' and 10' of rat hole. Swap the well to PowerVis. p4 ,4 5. Drill Build/Lateral: 4.25" OH, lost lateral and is now PB1 This lateral was lost due to well bore stability at the window. • 6. Run and set 45 KB Packer whipstock at 10,485' MD ' � a_ 7. Drill Build/Lateral: 4.25" OH, 2,750' (12 deg/100 planned) with resistivity to a TD of 13,235' • 8. Run 3-1/2" X 3-1/4" X 2-7/8" L-80 Cemented liner leaving TOL at -10,285' MD. 6. Pump primary cement leaving TOC at 10,285' MD, 31 bbls of 15.8 ppg liner cmt planned. . 7. Perform liner cleanout with mill, motor and MCNUGR/CCL log. 8. Test liner lap to 2,400 psi. iv L w P11) 9. Perforate liner per asset instructions (-1,000'). 3 , ( S 10. Freeze protect well to 2500' TVD 11.Set BPV, RDMO. Post-Rig Work: 1. Re-install wellhouse, flow line and pull BPV 2. Set liner top packer if needed with slickline & test to 2,400 psi 3. Set Gas lift valves 4. Test separator. Mud Program: • Well kill: 8.4 p g brine. • Milling/drillin : 8.5pg PowerVis for milling window and drilling (613 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 m go to GNI. Hole Size: 4.25" From 10,810' MD to 13,385' MD Liner Program: • 3-1/2", 9.3 lb/ft, L-80, STL liner 10,285' MD— 10,485' MD. • 3-1/4", 6.6 lb/ft, L-80, TC-II Solid liner 10,485' MD — 11,200' MD. • 2-7/8", 6.5 lb/ft, L-80, STL Solid liner 11,200' MD — 13,235' MD. • A minimum of 31 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 10,610' MD) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 90° . • Inclination at kick off point is 68° • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. . • Distance to nearest property— 32,578'. - • Distance to nearest well within pool — 355' from 05-36A. Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/MCNL logs will be run. Perforating: 9 • SWS 2", 6 spf, pert guns, 1-1/4" CSH work string, & 2-3/8" PH6 • The primary barrier for this operation: a minimum EMW of 8.4 ppg. . • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • 05-36 438' ctr— ctr distance) Fails at 11,169' MD. Status: Producer. • 05-36A 303' (ctr— ctr distance) Fails at 12,825' MD. Status: Producer • 05-36APB1 212' (ctr—ctr distance) Fails at 11,975' MD. Status: Plugged and abandoned. Hazards • Drill Site 5 is not considered an H2S pad. • Most recent H2S level on 05-35A is 22 ppm recorded on 1/21/2012. • The lost circulation risk in 05-35AL2 is considered to be low with no fault crossing p lanned. Reservoir Pressure • The reservoir pressure on 05-35AL2 is expected to be 3,276 psi at 8,800' TVDSS. (7.16 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,396 psi. • An EMW of 4 ppg for this well will provide 567 psi over-balance to the reservoir. David E Johnston CC: Well File CTD Engineer Joe Lastufka TREE= CNV V'JELHEAD= FMC 05-35B AClUATOR= BAKER C 4-1/2".... OM E TBG*** ORIG WELL NOT SHOWN KB.REV= 72 RLI AW W4IIPCT(Y I( i 'P. I'*** Proposed Cemented CTD sidetrack BF.ELEV= I LI/KOP= 2800' Max Angle= 95°@ 11029' Datum MD= 10429' Datum TVD= 8800'SS 2204' I—4-1/2"HES X NP,ID=3.813" 20"CONDUCTOR,94.5#,1+40,ID=19.124" 110' 4-1/2"TBG,13.5#,13CR-80 VAM TOP, H 72' .0150 bpf,D=3.920" GAS LIFT MANDRELS l ST MD TVD DEV TYPE VLV LATCH PORT DATE 9-5/8"WHIPSTOCK(08/29/08) —1 3861' 2 3775 3690 35 KGB2 DOME BK 16 07/29/11 9-5/8"CSG,36#,J-55 BTC,ID=8.921" H -'3875 \ 1 6401 5739 42 KGB2 SO BK 20 07/29/11 MILLOUT WINDOW(05-35A) 3861'-3875' 7"CSG,26#,L-80 TCII XO L-80 BTGM H 4212' PERFORATION SUMMARY REF LOG: Minimum ID= 3.80"@ 9508' ANGLE AT TOPPERF:N/A 4-1/2" HES XN NIPPLE(MILLED 02/20/11) Note:Refer to Production DB for historical perf data SEE SPF I'ITERVAL Opn/Sqz DATE 9371' 1-4-1/2"HES X NIP,D=3.813" 05-35A 2-7/8" 6 11290-11430 0 09/12/08 2-7/8" 6 11630-11890 0 09/12/08 2-7/8" 6 11990-12910 0 09/12/08 ► ► 9402' H7"X 4-1/2"BKR S-3 PKR,D=3.870" 05-35AL1 9435' I—4-1/2"HES X NIP,D=3.813" 2-7/8" SLID 11252-13169 SLOT 07/13/11 9508' I--4-1/2"HES XN NP,MILLED TO 3.80"(02/20/11) N O T E P O S S 1B L E D A M A G E T O L N R T O P 1 W L E P O S T C T D ML ( 0 7 1 2 0 1 1 1 9510' HIT'X 5"HR ZXP LIP w/TIEBACK SLV,ID=4.460" 4-1/2"TBG,12.6#,13CR-80 VAM TOP, H 9520' i 9520' —4-1/2"WLEG,D=3.958" .0152 bpf,ID=3.958" 9533' I—7"X 5"BKR HNC LNR HGR,ID=4.450" 9542' -5"X 4-1/2"XO,ID=3.930" 7"CSG, 26#,L-80 BTC-M,.0383 bpf,ID=6.276" H 9676' I , ) , 10,285'-Top of 3-1/2"liner and Top of cement 10,485'-Top of 4-1/2" KB Packer whipstock f , .:14 10 800'-Too of 4-1/2" whipstock 4-1/4"open hole TD at 13,235 MD � / 11250' I—3.70"DEPLOY SLV,D=2.950"' w ) , 2-7/8"solid liner at 13,235 MD' r 11251' F-3-1/T X 2-7/8"XO,ID=2.370 �1 . ------------- j " MLLOUT WNDOW(06-36AL1) 11222'-11234' 05-35 AL2 PB1 I `` `\ r;4.;:;4.; PBTD H 13170' PBTD H 12911' 4-1/2"LNR,12.6#,L-80 IBT-M,.0152 bpf,ID=3.958" H 12999' 1 2-7/8"LNR,6.16#,L-80 STL,.0.58 bpf,ID=2.441" H 13190' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/19/91 ORIGINAL COMPLETION 08/12/11 AK/PJC FINAL DRLG CORRECTIONS WELL: 05-35A/L1 09/14/08 N7ES ORIGINAL COMPLETION PERMIT No: 2081340/2110080 07/18/11 NORDIC 2 CTD MULTI-LAT(05-35AL1) API No: 50-029-22172-0,(60) 07/26/11 PJC DRLG DRAFT CORRECTIONS SEC 32,T11 N,R15E,2323 FNL&124'FWL 08/08/11 RCT/PJC GLV C/O(07/29/11) BP Exploration(Alaska) TREE_ 05 35A -� Y11�LtEAD= FMC � SAFE )TES: WELL ANGLE>70°@ 10511 *" ACTUATOR= BAKER C 4-112° CHROME TBG"' ORIG WELL NOT SHOWN I .ELEV= 72' L1 BELOW WHPSTOCK @ 3861"" BF. ELEV= KOP= 2800' Max Angie= 95°@ 11029' Datum MD= 10429' Datum ND= 8800'SS I 2204' —I4-1/2"HES X NP,D=3.813" 4-1/2"TBG,13.5#,13CR-80 VA TOP, H 72' .0150 bpf,ID=3.920" 120"CONDUCTOR,94.5#,H-40,D=19.124" 110' GAS UFT MANDRELS 9-5/8"W-FSTOCK(08/29/08) —} 3861' I. , ST MD ND DEV TYPE VLV LATCH TORT DATE 1 1 9-5/8"CSG,36#,J-55 BTC,D=8.9T1'7-1-1 •-3875 �— 2 3775 3690 35 KGB2 DOME BK 16 11/16/12 1 6401 5739 42 KGB2 SO BK 20 11/16/12 Minimum ID= 3.80"@ 9508' MLLOUT WINDOW(05-35A) 3861'-3875' 4-1/2" HES XN NIPPLE(MILLED 02/20/11) . • 9371' }—4-1/2"I-ES X NP,D=3.813" 2 ►, 9402' —17"X 4-1/2"BKR S-3 RKR D=3.870" • 9435' }—4-1/2"I-ES X NP,D=3.813" 7"CSG,26#,L-80 TC!XO L-80 BTGM — 4212' 9508' —}41/2"HES XN NP,MILLED TO 3.80"(02/20/11 NOTE FOSS:LE DAMAGE TO LNR TOP; 07'2 9510' —7"X 5"FR ZXP Li?w TIEBACK SLV,D=4.460" 0772 ML POST CTD r, 011 -41/2"TBG, 12.6#,13CR-80 VAM TOP, — 9520' '' 9520' }—4-1/2"WLEG,D=3.958" .0152 bpf,ID=3.958" 9533' —47"7"X 5"BKR HMC LNR HGR,D=4.450" } 9542' —5'X 4-1/2"XO,ID=3.930" 7"CSG, 26#,L-80 BTC-M,.0383 bpf,ID=6.276" — 9676' 1--4 ■ MLLOUT WPDOW(05-35AL1) 11222'- 11234' PERFORATION SI JVLAARY REF LOG: 11250' —3.70"DEPLOY SLV,ID=2.950" ANGLE AT TOP PERF: WA Note:Refer to Production DB for historical perf data 11251' H 3 1/2"X 2-7/8"XO,D=2.370 ` SIZE SFF INTERVAL Opn/Sqz DATE / 05-35A \ 2-7/8" 6 11290-11430_ 0 09/12/08 I 2-7/8" 6 11630-11890 0 09/12/08 \ 2-7/8" 6 11990-12910 0 09/12/08 I -. 05-35AL1 2-7/8" SLID 11252-13169 SLOT 07/13/11 �i i a M ail I N. — ■■- 7 ■ ■ g �■__■iii mow, ; ■ III ■ • ■■�_►, . ■ ■ r 8 ■ ■ X ■ ■ LI ■■■■ ■ t 1 ■■MU m ■ III • ■■0�5 / ° 1..02m lk?° 111 ■ 8 WI R■ ■ I____....111I' J, , . I � � ao g 8 s _ 8 a S o e o - § F o E o c 0 3 F - " (maim 0-CI)c oN/Oq1nuS -L- - g o en vs O a ‹.° , F$ge mime°. °P -I a 8 T O N h V O N m 0 I 0 tog3. s 8 8 8 8 g 8 8 8 8 8 8 8 8 8 g v ' S=.oS888S88S...... ° oea�r««..�««err«r«« __ 111 � _ _ `�& m" WR8,,...,g.g.g.,rn V E �E��Immm mmmmmmm PRIM i Q. N 88m f - %g8888 00008888 ■E m ,< 2', T4B888R2R2882222 (> - c' il =P:2n r�� _ a (ui/usn SL)tlldaQ lempan mu 1 il W mite az 0 v m H Z huh °$ ■.■■■11■■■■■NEE■ ■����� 4 el T lir 1._ -rF . .W74 g Flirt ,., , i -6`m i i T N il01111u__Hill, i Hill / ri g' tD ■■11■■■M■■V/II■■MIIM `°-, §N ■■M■■■■ /IM■■ ■■ i/ i • m ►/■� ® 91" M■■= r3 eg "k" ®■■ 1■� a o• ° �1\ 1 g9! • ANEW v z w =. K _. k � I 1111 m c J a N 0 a No I 1111' -Birr - r nry N N a g O ' [�] ge N C O WI] H I / ■ _ _ 988 —__ MK —'� NSW `■■■■■r a , Ansi ililli N ■M■■i�■ ■ri■M■ I ■\\■■1 11 / I1111 ■■■■M■■I■ iMEMM,U■■ r o , ,■■ ■ ,MM o 0 c rkgg25 11111 quirk AIP e 1111■■■ i item.... g inoni UMW 8 1111■■ ° , iI■lliall■r■■■■■ a. 11111111 ��■■M1�\■■■■■■■ c\ 0 n ry T h Y Y P.fA (uojsn 59)(+)111101• (-)glnoS m s • i 1H 1ril�is-�_ -�a�� � s a s QUeiaTAMMI ss ss s ssi s ss ss ssss'ssse� ss s s _ 8888888. 8.88 8 8 8 0 ;scs3A_;sim,s'ai%sies3gsi$,y� .s s}s3 gm o oo$0000$oo$oo$o N dg�d&d�q d+ydd�gd9�g9&�dd�dddg�.��a�'.�+4d�d�'d �� 9: " PMEa03E20gE8 f RM xA %1:: 3Ait :„z a smm.,s h ease&��aa��8a��aa�gaAa� �3aaaa�a9aaaa g , 8 g8 g 88888 88"88888 2 1!41!Iasi"eaais A as aa -i !!ip-iW 3,!ii!!!s ! !E a ) .3z m I8988r-R 88E . ss s S 110 r ` gf ww o 51 sssss ss s F _ >;11s $ _s ° N 02' gg' s s. CC s s awk d s s s sAaB N 'W o z Z49mN ry i LIRp t=m , f RA®sm 4 i ffi E2 7 8m_ a iSI lilt,aa 4 OggZa&a2 ggiit:AH " gm '- m ° /ii+ It aff#//11/t1+N 1##a#4#e1/11!##t f /.f! 0 2 m Z"VIIM23'2'2'" F O -- i.s.2m21212iiim '3m i xnn=n"8S-P3888888$e� 3 Arg I - e s=7=gg8888888888888 4 p ail FQ $SSR8888888888888 0 E .x 2m,"g. €p 2R°'F-&°$'A'ly'yN�N�5e T+7i�e8888 1 11 E,N W Ra 0 " rvn4�mm,mmo�rvnaV+mr ho .mo 0 O o O O N 0 O 0 0 0 e— O J Q N O U " 0 N O \ O ,+J O v o' 1 11111111111 --- O / j — — — 74 46. --- .4111111111111111111111%iiii . co rt 4re,N4117---.. ..W1101 ' 111\ c W 5 c O ,.111 Nri rifirifrw . c o - IF L.2 11 . dilh LW m,T 4 tQ o 'a 07 LLdo g l- O o d L � Ey 7 O / 0 N O N N N /� N I � North America - ALASKA - BP Prudhoe Bay PB DS 05 05-35 500292217200 05-35B Plan 8 Travelling Cylinder Report 03 February, 2013 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 05-35 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB DS 05 MD Reference: 05-35A @ 62.85usft(Nabors 7ES) Site Error: 0.00 usft North Reference: True Reference Well: 05-35 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 05-35B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 8 Offset TVD Reference: Offset Datum Reference Plan 8 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,462.58 to 13,235.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,520.64 usft Error Surface: Elliptical Conic Survey Tool Program Date 2/3/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 90.85 3,790.85 1 :Schlumberger GCT mullishot(05-35) GCT-MS Schlumberger GCT multishot 3,861.00 4,012.64 05-35A Srvy 1 Inc+Trend(05-35A) INC+TREND Inclinometer+known azi trend 4,108.98 9,617.29 05-35A Srvy 2 MWD+IFR+MS(05-35A) MWD+IFR+MS MWD+IFR+Multi Station 9,699.32 10,462.58 05-35A Srvy 3 MWD+IFR+MS(05-35A) MWD+IFR+MS MWD+IFR+Multi Station 10,462.58 13,235.00 Plan 8(05-35B) MWD MWD-Standard Casing Points I Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 3,861.00 3,697.21 9 5/8" 9.625 12.250 9,666.85 8,264.37 INTERMEDIATE CASING 1 7.000 8.500 13,235.00 8,863.51 2 7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) • PB DS 02 02-02-02-02-02-02 Out of range 02-02-02-02A-02-02A Out of range 02-02-02-02APB1-02-02APB1 Out of range 02-13-02-13-02-13 12,875.00 9,750.00 1,244.20 338.81 905.25 Pass-Major Risk 02-13-02-13A-02-13A 12,015.24 10,350.00 1,194.79 315.37 879.43 Pass-Major Risk 02-13-02-13B-02-13B 12,975.00 9,725.00 1,180.22 338.50 841.85 Pass-Major Risk 02-29A-02-29A-02-29A 12,150.00 9,575.00 499.29 312.11 200.36 Pass-Major Risk 02-29A-02-29B-02-29B 12,150.00 9,475.00 507.72 312.99 217.21 Pass-Major Risk 02-29A-02-29B-Plan#11 12,150.00 9,500.00 509.80 313.00 216.32 Pass-Major Risk 02-29A-02-29C-02-29C 12,215.97 9,600.00 506.39 323.61 196.64 Pass-Major Risk 02-29A-02-29C-Plan#17 12,215.97 9,600.00 506.39 323.29 196.94 Pass-Major Risk 02-29A-02-29CPB1-02-29CPB1 12,215.97 9,600.00 506.39 323.61 196.64 Pass-Major Risk 02-31-02-31-02-31 13,200.00 9,450.00 521.13 342.40 184.28 Pass-Major Risk 02-31-02-31-DEAP defin 13,200.00 9,450.00 521.13 342.39 184.28 Pass-Major Risk 02-31-02-31A-02-31A 13,235.00 9,300.00 478.89 311.99 171.47 Pass-Major Risk 02-31-02-31 APB1-02-31 APB1 13,235.00 9,300.00 534.69 311.79 223.51 Pass-Major Risk 02-34-02-34A-02-34A Out of range 02-39-02-39-02-39 Out of range 02-39-02-39L1-02-39L1 Out of range 02-39-02-39L1 PB1-02-39L1 PB1 Out of range 02-39-02-39L1PB2-02-39L1PB2 Out of range 02-39-Plan 5,02-39A-02-39 Out of range 02-39-Plan 5,02-39A-Plan#5 Out of range CC-Min centre to center distance or covergent point,SF-mm separation factor,ES-min ellipse separation 2/3/2013 6:32:38PM Page 2 COMPASS 5000.1 Build 61 19 Pl!n8 L 0009 SSdd1/1100 E abed INd9C:ZE:9 ELOZ//Z uogeiedas asdilla ufw-S3'u0loe;uogeJedas ufw-jS'lu!0d luabuano0 uo aoueaslp laluao 01 841180 WV'00 9s!d1ofery-seed 81'006 95'800 E0'9901 199'5 20'618'9- 00'010'1 20•041- 8911 41'61 *819916 00'004'6 14'E98'6 00'006'01 4.!81.1.141-...d 64006 11r600 91'010'1 199'9 49•688'9- L0'910'1 00'641- 9911 1111 0010911 00'914'6 19'09811 00'006'01 991.8 iofeyy-ssed 061096 0Y600 94'4181 199'9 101006'9- 99'610'1 40141- 0911 4111 0901918 00'091'6 15'098'8 00'006'01 4.%101e1A1-ssed 89•016 01e6E0 90'190'1 189'9 99L099- 89'000'1 Z0'001- 08111 10161 09'111'8 00'009'6 19'098'9 44'069'01 9•1.211ofery-ssed 06'016 10'600 81'810'1 189'9 91/*1080- 94'100'1 19'941- £9111 L0'61 90'011'8 00'909'6 10'099'8 09'18811 11.!21 lofery-ssed 99'806 10'6E0 66'980'1 199'4 10'1194- 19n00'1 66161- 9801 96111 06'061•8 00'099'6 54•0990 691,88'21 Is%Jofery-ssed 10'906 00'600 0E'4K1 0051E 94'991'9- L9'900.1 0E09 £0'61 88'91 19'806'8 00'008'6 54•098'8 00•419'01 11s9:1l01e19-ssed 14'906 06100 95'990'1 0090 41'991'9- 90100'1 9E311- 00'61 89181 5890611 00'4116 10'098'9 00118'01 AS'03'00'9•!21 lu(ery-ssed 0'406 18'900 089981 005'0 56•911'9- 40010'1 101091- 1601 99111 00'088'8 00'0516 19'E98'9 00'918'01 99!8'OM-ssed 89'906 11000 90'440'1 004E 90'1819- 10'910'1 10'291- 16'91 9901 68'099'8 00'4016 15'098'8 00'018'01 9s!8loF 11-ssed 04'906 191800 EL'110.1 0091E L1'L6L'9- 10110'1 £0'195- 06'81 88'81 £8808'9 00'001'6 19'09618 00'91811 11s!84e11-ssed 41106 E6'900 99'990'1 0091E LC L08.9- 1£'100'1 81'091- 88'81 88111 99'9148 00'919'6 19•09811 00'916'01 M.!%mlery-ssed 69'106 801600 6E010'1 009'0 11'911'9- 09•000'1 41'191- 80'61 9081 99'1961 00'908'6 19'0980 01'498'01 Ms18lole91-ssed 08'606 1180E 10111/8' 0091E 10'901'9- 1,0300'1 41'691- EV61 01'91 10'416'8 00'008'6 19'0908 10'198'01 98!8 lolery-ssed 061616 0Y100 989981 0041E *190119- £9'066 69'015- 40'61 09111 01'0••6 00'926'6 ITEM'S 00'098'01 4s9 lofepl-ssed 90•956 60'100 90'000'5 009'0 19•951'9- 98166 99711- 22'65 09111 94'610'6 00•006'6 19'098'9 00'098'01 99!9101091-ssed 0'016 42100 60'0981 00410 9*9ZL'9- 0'866 24311- 91'61 0901 40 L66'9 00'918'6 14'098'9 00'008'01 ,1.1i11,4.141-...d 49746 I9'00E 99'6981 0051E £9119'9- 61'896 06'691- 10'61 91*1 00'1116 09-•00001 19'09811 00'054'01 96!9 1610 91-000d 41046 09100E £0'848• 00410 00189'9- 00'186 68'94 L- 80'61 91Y1 901890'6 00•916'6 14'099'9 00'09101 99!8161091-ssed 01'906 9100 00'198) 009'0 10'169'9- 081666 48'14 t- 0161 9141 49'490'6 00'056'6 14'099'0 09-05101 lose) 1usn) 400 (u1.) (9•n) (LSn) I,) (090 (o•n) to.n) tosn) )use) !o.n) 901.30!000 009019!❑ 011100 OPS 0106 M-13+ S-/N+ glnway 91190 USda0 gida0 gld00 6u!weM a!gelno!!y co ON of 8µ9a0 -0u!se3 01000 a0oq!!aM 10980 +7oe1!o01 17900 esualayaa !e0glan palnse791 !ea!Nan p0lnsea91 s!xy,05sw!0000 18980 ao alalso Ilse 00'0 .10113!!OM 50980 0)s!8_seen:0866!994 aim SV )A0-93-0056'SWO-J0-OAO-90 I .00e1600d 6anms Ilse 00'0 .10118 09 0 10990 E1-Z0-El-L0-C1-ZO -ZOSO8d u6!saa13%10 00Z/1 JOu!lN-ssed L9'L0Z 91'1E Z4'Z a 00'09E'11 00'9L6'11 18dV9C-90-18dV9E-90-9E-90 00V1 u0u!lgl-ssed 99'96Z £6"0£ 90'909 00'901Z1 00'9Z8'Z 1 V99-90-V9E-90-9E-90 00Z/1 mum-ssed 6L'EE4 MK 99•99* 00'9L4'01 16'991'11 9E-90-9E-90-9S-90 SM02l2l30N-IIVd 19'0- ZE'0 00'0 00'9L4'01 00'9L*'0 L LOdZ1V9E-90-18dZ1V9S50-SE-SO SLIOaa30N-IIVd 1410- ZC"0 00'0 00"914'01 00'9L4'OI I1VSE-90-11V99-90-9E-90 SLIOLRI3ON-IIVd 99'0- 14"0 00'0 00"91401 00'91*'01 V9E-90-VSE-90-SC-SO 'Is!a 90100-ssed ZE'099 41'88Z 90'4£6 00'099'01 191££8101 9E-90-SE-SO-SE-SO 861.12J;0 lnO V 1E-90-V 1E-90-15-90 a6ueu;o ln0 1E-90-1E-90-1E-90 a6ueu;o Lno V9Z-90-V9Z-90-9Z-S0 a6ueu 101n0 9Z-90-9Z-90-9Z-90 a6ueu;o ln0 8CZ-g0-8CZ-90-EZ50 86901;o Ln0 S ueld-091-90-9150 06ueu10l110 891-90-891-90-91-90 a6ueu;o 100 V91-90-V91-SO-9150 a6ueu;olnO 91-90-91-90-91-90 86118J ln0 18d891-90-19d891-90-91-90 a6ueu;o ln0 891-90-891-90-91-90 a6ueu;0100 V91-90-V91-90-91-90 a6ueu;0100 9150-9150-9150 abueuJoln0 V41-90-VPL-90-*150 )isiN JO1eyy-ssed LE79Z 4L'8EZ 16.LL4 00009'01 1.4'6L4'01. V11-90-V11-90-11-90 90 SO 8d (Ilse) (Ilse) (use) (Ilse) u6!se0-alogllaM-IIaM la%10 veld W01; (usn) azuels!0 g1da0 q da0 aweN ells 6uluueM U0!ie!na0 809019!0 °hues p8inseeyy paunseayy a!gemo!!v o0-oN 00 ailua0 13s10 aouelalaa fuewwng wnle0 190110 :80981.8188 0n.1.18910 9 9011 :u6!sa0 a3uaua;aa LdONV-008d ellselV-)icu IN03 :asegele0 699-90 a1.090aM a3uaJa;a8 ew6is 00'1 le 01.2 010118 lndlnp llsn 00'0 :10,13 IIaM aunlenln0 wnw!u!0J :poglayy uo!leln3le0/Laving SE-gO IIaM a0uaiela8 3111 :aauaialaa IIi°N (lsn 00'0 :10113 ems (93L=geN)9sf99'Z9©V99-90 :a3ualalarl GIN SO SO Eld :al!S e3ualala8 lanai ea5 ueayy :a3uauala8 001 lle8 eogpwd :78101.1 99-90 IIaM taouala;aa aleu!puo-o0 le 301 d8-V)ISV1V-e011awV 1luON aluedwo0 ;Jodaa lapimA3 6wpanCJi d8 • — 11 6 C W ,,- ., 1 1 1' 1 1'1 .12 0 y LLa ....... I- �� a 111 = 9 0 I ii Y y Ii o i o 044 g x I 11 • g■ • 1 11 �� 11 ii ? • ■ o co sp U 2 C z Uf f U m°a U U' �` I Y • Q .0 ha 1 I2`ns = 1 1 ^ III'. III T Q . IIII III 2 . 1 U a° zJ ( II 1 Z 1 i n. › 01111 < 1r : 1 J 0 e E 0 111 0 U U re t2 ® 111 I ' ■ _ I--IC1= 1a uI � t _ II a S W I S II E E 3 0 L1.1 111 It m U11 m 0 I- I 1II • • t a " I - v v III 1 _ H 1 1 le .., I III III alla I : il II n u p I u A 1 it. I I 1i I U ` 11 I o 1 I w 11 11 d 1 jj II Q 1 11 II 111 (0) — 1 ° 111-11111I Y TRANSMITTAL LETTER CHECKLIST WELL NAME ( 4 ( s -:6 PTD# ' / ) f C1 1. Development Service Exploratory Stratigraphic Test Non- onventional Well FIELD: r a Ct"s- - POOL: ,---,.<__ A__e____ r--)1 __________, Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well . SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals _ through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for(name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 I co To aa)) a U) () a) 0 O N L , 7 N C a) L co .0 C cn O >., n 41 O co a0 ✓ c a a v > W cn m ca p O w ao co c c 0O 0 cci II 3 2 O N M N "@O _ 0` N d J O U N Q a 7 Q ) 0 @ (O O" d CT rj n @ M CO(O C C _o U ° o - w 3 0 v co f E 3 p vi a0 ots .� co @ '@O 3 — co W N >a) .c ao co C N o (0 'O O cs4 C 7 p > N m 0 0 a "0 (0 ~ N > 7 (() J V N @ M > U) Co < M i _c @ Y In O .N N .- a) 0 c J U7 .t a) O ° O CO n @ W, a•F- 0 a) O a) > Ul 0 — O a) co (6 0 O n O p_ U) (� 4 �. Z i d C , .O n E y n co n �.. D a) c °. N co N N @ >- — o 0 Lo @ @ 3 0 I� I n c Q O — 0 co -p 0 O a) 0 (,N, (0 N ca m o W t C co o a) a) , a) N co `) O CL c a W Q O CO @ CO D C U) co U) 1° a) 7 m 7 c co co 2 0 a) ° a a0i c aa)) 3 co a 2 a v) D• W a CC FL- p m 'E T N Q M .c °- = 'C �- @ n o Q. a) - N �; v E 3 a = .o _ a 2 0 m 3 a cp) m .1- 3 n o m -0 Cl) a 5 N °) O O U W @ co N N U) c 0 M U CA U) N OU E a) o O a .c `o U 0 o) - co c-, >, a) M @ a) -p @ O U a) a) C O Ul n N a) 3 a) 3 0 Q 7 U U 'y @ Z' E E. = co.) o 'C D co C -C 't co cc)'t co n L _C X X ( U) 0 n co O A O2 @ O N (n X n w U) a 0 0 O co cn I- co r it co a 2 2 I 0 W n a > W a < < UN) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) < Q < < < < < aa)) CO aa)) aa)) a0) < aa)) aa)) U)) aa)) aa. a < 0 aa. < < < p_ Z Z >- >- >- >- >- >- >- >- >- >- >- >- z z z z z z Z >- >- >- >- >- Z >- >- >- >- >- >- z Z >- Z, Z Z a) N LL f6 @ _ >, 0 U us o c (_v o a) :a E 3 - E a) O 0 Iii � E O N "O @ O co N cn co n U L.L N n O j c > c LL t n CO a) a> i as oo0 i i co-o _ o 0@ _ c E v o@ w o 7 t c E ur `° >, E o O 7 a) C @ N C U) O 7 O C N @ C > N N M 3 .. o _ @ 0 a) O` U N N m C o — 3 a. "O 2° C a) 7 a) ci N >, w -°- n 0 -3p —O o 0,5 E a_°) (6 °" M '°O O w 7 '.. m 0 = L U) ` > (0 @ 7 3 N v) c co L C co 5 - 9 3 Q co N a N p) W — 0 0 C -o O N C @ N 4 O ` a) m 0 0 CA N a L c C N C p 0 c i E E = -0 C c E m 00� o C 0 .>_ H a o '- us aa)) fY C t a) n N r n °) 2 Y Ln o o -a 7 :o o 0 o m c o o m 5 U 'n °• m 0 o •ai ■fl 0 a .3 0 > N N >, a) vo) � < o Q °o a) a) 'E E >, o > > ° -0 @ Y 0 0 0 a) @ 0 @ Q m w o 0) 0 a)) c v CC J E n 0 0 m .c 9 0 0 a) C - n Z o E 3 o a) L m 3 a) a Q E 0 c v@@ _.5 co 0 L .° @@ -70 CD@ 0 c C a) N M m 0 �, CD O v) on a 3 0 •� o T 3 E o Z c o y ( - n n •m _3 _3 a°i c a) 0 °) 3 m ° co a) w. a °) �, m 0 3 r p ° W( o O ° o c a a > .Q a a o@ 0 > @ o o c° o v o °o a) n ° o rn c ,, o o Z 0 a p 0 @ a) @ �° 0 0 a) E o a) `o ' co E a) @ E o a) ° y c • H N O. 4p 0 0 _ 7 7 0_ _C V () n o a) Q — a @ N -p @ E @ O (n 7 c O O -0 1Y cn 0 0 E@ o o@ o m n u) co L c °- c n c c m cp_co s@ _o 5 o a)>-• c _ 3 = a w ° u) o_ n N O 0) N @ C n n N 3 >, @ a) a) a) C -O L- c CT CT m C Y @ 7 n 7 0 a) U) >, «. a) f.L J @ 1) C "O "O "O 0 •- C (U6 L L L -0 L a) N 'U) a) a) > .CA @ L )) a V) U O U 9 C 0 12 E O C E .) 0 Q) CD @ -' O L c c --' N 0 @ -0 -0 o to _ 3 'O p cn c 00 0 CO c a) c p @ H w U w 7 3 m@@ o a ca E m 3 a7 0 U @ @ _ _ o m — C @ O c C U U U 0 O 0 w U a) O O @ 20 @ 0- N 'c o a (A d o N a) 0 O O .0 .@ @@ a O a) p- o 0 > > 3 OC) a N O N C) W W a) Y N -co ° E a) (.1 .6 r^ J m c E cn c3 - - - o o a) E E c - 3 c 't I- f- f- 'N g a) > - fl d p n E co cn CO e @ -J 0 0 2 'c a) a) a) 7 -0 0- 0- 'a5 a) @ a) - 2 o 7 2 2 2 @ -p @ -o - E 0 0 L ° a) a) @ m a), 0 p V m z a J CO w O O a n U Q a U cn U U U U Q Q o m m U �' a o co co O, I O f� _ O N M V (0 (0 W 0) O N M V to (O f- CO CA O N M V (0 (O N- co C) N N CO V (0 CO r CO C)) •- N N N N N N N N N N M M M M M M M C) M M V U 1— M M _M y O c O w O O U C (� C. co N f6 N f6 (\f O ( J CO O 0 co D N p y W ° is (:) c N N ' J N N m o) O O o f a 0 C a > 0 Cl) Q U ill d Q Q W Q Q