Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout189-036 • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate El Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 189-036 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21933-00-00 7. Property Designation(Lease Number): ADL 0028320 8. Well Name and Number: PRUDHOE BAY UN LIS L5-36 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,LISBURNE OIL 11.Present Well Condition Summary: R I`/C G Total Depth: measured 12172 feet Plugs measured feet ECE r true vertical 8899 feet Junk measured_ feet MAY 0 4 2017 Effective Depth: measured 12161 feet Packer measured 11396 feet true vertical 8892 feet Packer true vertical 8346.96 feet OGC Casing: Length: Size: MD: TVD: Burst: 4 Collapse: Structural Conductor 78 20"91.5#H-40 43-121 43-121 1490 470 Surface 4915 10-3/4"45.5#J-55 40-4955 40-3992 3580 2090 Intermediate 11615 7-5/8"29.7#L-80 39-11653 39-8540 6890 4790 Production Liner 756 5-1/2"17#L-80 11420-12176 8365-8902 7740 6280 Perforation Depth: Measured depth: See Attachment feet { Salta MAY ' True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 2-7/8"6.5#L-80 36-11656 36-8542 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 2.875 Camco TRDP-1A SSSV 1924 1888 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 11 3131 863 20 644 Subsequent to operation: 292 12019 1180 2210 921 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 1 Exploratory 0 Development Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil I1 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Sauve,Mark A Contact Name: Sauve,Mark A Authorized Title: GPMA/LisbPE L� �A Contact Email: Mark.Sauve@bp.com Authorized Signature: Date: S// '7"_ Contact Phone: +1 907 564 4660 Form 10-404 Revised 04/2017/YA vrL 57/o//3 BDMS L4/ MAY - 5 2017 Submit Original Only • • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary May 4, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for L5-36, PTD # 189-036 for adding perforations. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 41 40 a> N l6 0] r` 1b M V 00 6) O) C) 10 O (O N- 00 000) O) 0) O) CO N M CO M N- LL) O M O O) (O d' r- CO LC) N O) (O V Cb o0 In O) (O N- V O co O — LC) 00 N 15. 6 (6461--: 6 = N Ln O r` O m O N M N N O ( N M LL) (O M . N ,rO O 6 m O r` O O O O r- •- r r_ . . . . . . N N r_ r_ co co co co co co �' O (O N- r` N- N- r` r- N co r- N- N- r- N- r- ti r- op co r` N- r` r` N- N co r` r` N co N- N- r- h 0om000000mo0m 0000CO0000mnoao 1p1baoco1pm 0000oo OD000000 > I- a O I- CO N N- co co Nt 00 O) CAM LC) (D (O r` 00 o0 CA D) O) O) o0 r— - M c- 00 co r- = co O M O CA (D - — CO (fl v- Lf) N O) CD 00 L() O) (D N Nt " M O " LO CO M M O O c`iLC) O0 . . . . . .OO 00 OcY c6 cd N N Oc6 6 M M M M M M O r` r` r` N- r` N- ti N N- r- r- N- r- r` r` N- r` r` r` r` r` N- N- N- N N- r- r- 0 0 co OO 00 00 OO CO 00 00 00 CO OO 00 00 OO 00 00 M OO 10 CO CO 00 00 OO CO o0 CO 00 OO I- a> 0 N CO 101010101010101010101010101010101010101010101010 1010101010 Ln Ln (Q r M Ln (D O (C) (D r- CO N M LC) (D N- OO N M O c- V' LD r` CO N- N N O O M ct (D M r-. O `W a 00 N- r- CO 00 00 OO 00 00 O O) O) O) O) O) O O — — �- �- .- r- N N O N M M M M O M M = M 0 = 00 00 OO CO CO CO00 CX) CO CO CO CO CO M O O) O) O) O) 0) O) O) O) O) - O) O) O) O) (A - D) O) a) J " S m12 as J Q } a Q o M L O � l(') lL') LD lD L() LC) 117 LC) L[) ll) Ll7 L[) L() L[) L() Ln Lf) In l!) 11) L(') L!) ll') ll) LI') lf) In l() L() � Ln C m Qm Ln (D O = Ln M r` 00 N M Ln M r` M N M O r V' Ln r- O - N N m O m ,rm M r` m r` N- CO 00 CO CO C70 CO 0) O) O) O) O) O) O O N N O N M M M M O M W o. — — 00 OO 00 00 OO 00 00 OO OO OO 00 OO OO COO O) O) O) 0) O) C3) CA O) O) — O) D) O) 6) D) — O) MO 0 L' IHD O 0 2 O _ 1.6 aa 43 O U a a a a a a a a a a a a a a a a a a a (1 a. a a. a a a a a a a a a a a r2aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa d QmmmmmmmmmmmmmmmmmmmmmmmmmQQ « « « a 0 0 ar a d m o) a) o) o) a) a) o) a) a) (n a) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) D) 0) 0) 0) O ~ 0000000000000000000000000 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N V O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) O) M 6) CDM CD M OD 00 00 00 CO CO OD CO 0 of E m Z 6666616101661661061011161116116 (01 (0 (0 (Y) M M C") C") (Y) M C) C") C') C") M C`') C) C") M C") C") C") C") C") M M C") C'") Cr) C") C") M C") M C'") M C") (13 US i i i i i i i i i 1 i i 1 i i LC) L[) Ll7 In LC) US In L[) Ln Ln LL) Ll7 L[) Ln Lt) Lr) LL) l!) lC) 11') Lt) l(') Lf) 11) 11') 11') L(') LC) In LD In L() In lC) J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J 440 (p M N OO t N (D OO O O M O . M I� OO N O N N O O 0 r V M O O M O O ti h V LO N C 0 V N- - . M � to O CO O O . . N 0 0 0 0 . f�- CO M CO O M O I— r_ Cp O) O) O) O) O) O) O M M M Nt �1 V t CO CO C— N- C— I- C— I- M I— r O I- I-- r 00 00 O0 00 00 00 m OD m 00 m 00 00 00 O0 00 00 m O0 Cb aD M 0 CO OO OO Cp Cp OO IXo Cb 0O 00 00 00 aD M OD O0 00 OO OO OD Cb O0 (b OO OO OO OO OO O Cp Cp LO d- M M N 00 V N = M C70 W t� M N W N C9 = M M 0 0 O M I` 00 N O) LO M C M ti V N N LO CO M N N M O Lt) M O O M CCDC0 LO r C� 00 N LO N 0�0 V' CO Cb p 0 Cfl CO OO O = = NMN- M0 = M O M M O O - O O O O V LO (D O O O C4 N CT M O M CA O C3) O = = M M M M O Cfl f� I� N- r h ti M CO W Cb 00 M M M CO OD 00 CO CO CXR 00 M CO O M CO M Cb Cb Cb Cb Cb 00 00 OO CO M O a0 OD CO 00 CO CO 00 OO CO M OD CO M OO M CJO CO Cb M CO OO 00 00 LO 000000 000 00000 0000 00000 COLOLOC() LO O N- N M COCO p V 00 h N N N M O I� N f� OO O O ONO — v 0 M r. p O CO CO CO CO CO p OD CO CO p 0 0 0 p CO M CO CO p CO p r- C N N N CO O c- M M M O) M C) , O M O) Cy O O O O O N O O O O N Cy O O O O O N N = = `- N N N N N ,- N N N N = = N N N N N ,- N N N N N LOUD LO LO LO LO LO LO LO LU LL) LO LO LO LO LO LO LO LO LO LO LO LO LO LC) LO LC) LO LO LO L() O O L0 = N M V O ti O M LO M p V I,- Cb ,- N OM N M N N- OO M O m N V' Ln O C` M d- O) O aD O CO O CO CO 00 CO O p 0 0 0 = = p M M M M 00 p N N N N CA O ,- M O O O O O O M M O N O O O O O N O O O O O Cy O O O O O N N . . . . . . N N N N N N .- NN N N N N N N N N N N N N LL LL LL LL IL IL IL IL LL M M M M LL IL LL 11 LL LL LL IL IL LL LL M LL LL 11 LL LL LL LL LL LL LL IL 1L MMMMMMMMMMMMMMMMa. MaMMMMMMMMa. Ma. MDMO MO O Q ¢ Q Q Q Q Q Q Q m M M M Q Q Q Q Q Q Q Q Q Q Q 00 Q Q Q Q Q Q Q Q Q Q Q Q 0000 O . . . . . . r' 0000000000000000000000000000000000000 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N O O M O O M CM M M M M M M O CM M M M O CO M CO CO CO O CO M M M OO M M I� f� N N N N N N N N N \ <- = N N N N N N N N N N N \ N N N N N N N N N CN N N COM COM M COM M r r r r 00 OD 00 00 00 M M 0O0 00 CO M c- CO M 00 00 CO M 0O M M OOOO CO OMD 0000000000000000000000000000000000000 M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M IIIIIII 111111111 III LO LO lO Ln to LO LO l() LO LO LO LO LO LO l!') LO lO lO Lf') LO Ln Ln LO LO LO LO lO tf) LO L() lO lC) lO 11') Ln LO lO J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J • CO• O CO N CO CO CO CO O O O r— N— CO CO co co oo co co co co CO co co CO co CO V (0 a) N " CO CT) CO N CO CO CO O) O O 0 N— CO CO LU CO CO CO CO CO CO > CO CO CO CO CO CO 0 2 W O O O cn W W 0 0 0 W J J Y U O 0 LO LO LC) LU LC) O O W 0 0 W L W CO CA O N J J J d (n CO CO c Nr - ¢ ¢ < W 0 CV 0 0 0 J W W N N N NN J J ¢ ¢ ¢ O2 O O d W 0 II I Z 00 O H O 00 0 W ioe Z O Z LU LU CL <O t) C/) C/") c cUn ¢n LC) LC) LO LC) LO LO CO 6 O v— N CO CO M ct NI- .— • C N N N N LY Cn = - d J d LL LL LL LL LL LL QQQ ¢ ¢ Q I- 0 r o D O CD O 0 0 0 0 LU J J Z N N N N N N ZLU 1 1 ¢ 11 W r r— r— r— N- O W11 O JJ J V N LL N N N N N N Z CL J :7 U 111 Ow LU LL W 0o co co co CO co ¢ O J F J J D J LY CL CO O1' D1' W O W W ¢ ¢ m 0_ m cn LL LL ;n LL Cn 0_ tY (0 (0 CID COCOCO M M M M M M w a cn O w N CC LL L() Ln U) L6 LL) LC) CO CL CL U J O O w CL J J J J J J ¢ ¢ m CO LL. LL. Cn Ln Q 2' • 0 Packers and SSV's Attachment PRUDHOE BAY LIS L5-36 SW Name Type MD TVD Depscription L5-36 SSSV 1923.88 1887.87 2.875 Camco TRDP-1A SSSV L5-36 TBG PACKER 11395.67 8346.96 4-1/2" Baker DB Packer L5-36 PACKER 11838.12 8676.54 5-1/2" CTC EXT CSG Packer • • 6 0) II 0 \ 2 Lii to 0 7 z E f / z \ I _ . nom 5 o0 0 / $ 2 ? < cow / & Qf ® a_ 110 0 < 0 // % _ U H � / / Li m 2 LL 0 O Q w —qc o um .- a g )$ / © O e �� 2 0 / __I % / % � / _ � � �w Nor (Li / co / E / Z < < I O I U) / k \ a 0 0 0 k 2 o co * _1 O/ § E 3@ 0_ / / c[ 2 1- / < f /w m O / l m 0 - \ k ■ _ m O = ,- ,— m I R 01— < m _ - g a I _lob O W m G / \ / Co ± , 0 _i I (0 @ / / f 2 > \ / /_,/ / Lf \ / \ \ \ / z ± gal \ 2 ƒ 00 / z \ / zF- moH / 7 • w o 0 _ 0-/ < d \ 5 0/ 2 ° / \ \ - t O ' 8 b - . 0 a, ® _, ® \ _, ® \ O 2 a@9t7 0 - O0 O < $ a & 2 U)2 I S 0 0_ 2 0 o 7 @ R t ^ / / 3 7 ® �\ w _ R 6 9 >,• Ce \ > f E \ d \ / CO a \ E Ct CN 0 ƒ > . 0 < F- > -5 `,:71, ---- 0 @ r G 0 / \ � 2 � CI (1 / i / 2 / / / R -mm z o) / < A 2 ° # d < 2 12 7 I $ r- ƒ < \ w Z N- _ Z » 1 1 2 �� + Q < m O / / / / > O 0 $ a 2 > o 2 0 0 �� E / & C) om - � ICRI _ . < 06 O x / 2 ® \ G i \ ƒ L- 00 < $ O - O - O b W �� \ W �� O & \ 0 0 / / co Tai / OZ 0 / / 2222 _ifx \ 0 < 0 u) i / ƒ i 6 $ i k \ 0 ƒ rx 0 ƒ < / f i 0 L 0 ¥ » \ I- 9 / / / A 5 m f / / - # < 'TREE= 2-9/16"CNV WELLHEAD= FMC SAFETY NOTES: ACTUATOR= BAKER �� KB.ELEV= 59.0' BF.ELEV= NAI] [ KOP= 1300' 1922' —2-7/8"CAM TRDP1ATRSSSV,D=2.312" Max Angle= 54°@ 10400' LOCKED OPEN(04/10114) Datum MD= 12268' CHEMICAL INJECTION MANDRELS Datum TVD= 8900'SS ST MD tV D DEV TYPE VLV LATCH FORT DATE C L 1 2017 1970 29 KBMG-L DMY BK 0 08/21/12 GAS LIFT MANDRELS 10-3/4"CSG,45.5#,J-55,D=9.950" H 4953' (ST IVD IVC) DEV TYPE VLV LATCH FORT DATE 2 3056 2777 48 TE-TGPD DOME RK 16 09/25/12 L 3 6500 5067 45 TE-TGR) SO RK 20 09/25/12 4 8935 6762 49 TE TGPD OM1' TG 0 07/02/89 Minimum ID = 2.250" @ 11624' 5 10864 7958 48 TETGPD DMY TG 0 07/02/89 2-7/8" OTIS XN NIPPLE 6 11337 8303 41 TE-TGFO DMY RK 0 05/29/95 11395' H2-718"BKR LOC SEAL ASSY,ID=2.441" —I 11375'elm H7-5/8"X 2-7/8"BKR DB PKR,ID=3.250" I 11416' —{TOP OF BOT TEBACK SLV 11424' H 7-5/8"X 5-1/2"BOT LNR HGR I I I 11624' H2-7/8"OTIS XN NIP,D=2.250" I 2-7/8"TBG-PC,6.5#,L-80,.0058 bpf,ID=2.441" —I 11635' / \ 11636' H2-718"SHEAR SUB/TT,D=2.441" 7-5/8"CSG,29.7#,L-80,D=6.875" —1 11650' A 11633' —3 ELMD TT LOG IXJAVALABLE PERFORATION SUMMARY REF LOG:CM..(POROSITY)DA ON 06/27/89 ip �_' 11835' —I 5-1/2"CTC EXT CSG PKR ANGLE AT TOP PERF:43'@ 11790' I� ' Note:Refer to Roduction 08 for historical perf data SIZE( SPF l INTERVAL 1 Opn/Sqz I DATE �1 PAGE 2 FOR PERFORATION DATA I I I I PBTD H 12161' 5-1/2"LNR,17#,L-80,0.0232 bpf,ID=4.892" — 12172' 4.4.4.4.4.4.4.4 DATE REV BY COMMENTS DATE REV BY COMMENTS--__. LISBURNE UNIT 07/03/89 ORIGNAL COMPLETION 09/20/11 JCM PJC RE PERFS(08/27-29/11) WELL: L5-36 01/09/01 SIS-CS CONVERTED TO CANVAS 08/27/12 MSS/IVO CN&GLV C/O(08/21/12) PERINT No: 189-0360 03/02/01 SIS-LG FINAL 10/01/12 LEC/JMD GLV C/O(09/25/12) API No. 50-029-21933-00 12/31/01 CH/TP CORRECTIONS 03/23/14 GJF/PJC TRSSSV CORRECTION SEC 1,T11N,R15E 2387'FSL&37'FM. 03/03/07 RL DATUM MD 04/14/14 JMG/PJC TRSSSV LOCKED OPEN(4/10/14) 02/03/09 ?!SV CORRECTIONS(GLV/ II&14 04/12/17 MS/JMD ADPERFS(04/04/17) BP Exploration(Alaska) ._ • • L5-36 1 lir. i n PERFORATION SUMMARY REF LOG:CNL(POROSITY)DA ON 06/27/89 ANGLE AT TOP PERF:43"@ 11790' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE 2" 6 11790-11836 0 04/04/17 2-1/8" 1 11876, 11881,11886, 11888 0 07/09/89 2-1/8" 1 11893,11896, 11898 0 07/09/89 l 2-1/8" 1 11903, 11911,11915, 11918, 0 07/09/89 2-1/8" 1 11922,11930, 11934,11937 0 07/09/89 2-1/8" 1 11940,11962,11964, 11967, 0 07/09/89 2-1/8" 1 11981,11984, 11986 0 07/09/89 2-1/8" 1 12004, 12008, 12012, 12033, 0 07/09/89 2-1/8" 1 12037,12072, 12078, 12080, 0 07/09/89 ' ' 2-1/8" 1 12125, 12127,12138, 12140,12142 0 07/09/89 2-1/8" 4 11875- 11942 0 07/09/96 2-1/8" 4 11927-11937 C 07/09/96 2" 4 11927-11937 0 08/29/11 A L 2" 4 11953-11968 0 08/29/11 2-1/8" 4 11953-11968 C 07/09/96 2" 4 12004-12024 0 08/29/11 2-1/8" 4 12004-12024 C 07/08/96 2" 4 12030-12040 0 08/28/11 2-1/8" 4 12030-12040 C 07/08/96 2" 4 12072-12082 0 08/28/11 2-1/8" 4 12072-12082 C 07/08/96 ��pp 2" 4 12090- 12110 0 08/28/11 ID O. 2-1/8" 4 12090- 12110 C 07/08/96 ' 2" 4 12124- 12144 0 08/27/11 2-1/8" 4 12124-12144 C 07/08/96 ' I I I 11111/111e 444444e 6/ 1 DATE REV BY CONIVB'TTS DATE REV BY COMIvB'TTS LISBURNE INT 07/03/89 ORIGNAL COM1FIEIION 09/20/11 JCM'PJC RE PERFS(08/27-29/11) WELL: L5-36 01/09/01 SIS-CS CONVERTED TO CANVAS 08/27/12 M1SS/JMD CN&GLV C/O(08/21/12) PERMIT No: 189-0360 03/02/01 SIS-LG FNAL 10/01/12 LEC/JM) GLV C/O(09/25/12) AR No: 50-029-21933-00 12/31/01 a-YTP CORRECTIONS 03/23/14 GJF/PJC TRSSSV CORRECTION SEC 1,T11 N,R15E 2387'FSL&37'RAIL 03/03/07 RL. DATUM MD 04/14/14 JMG/PJC TRSSSV LOCKED OPEN(4/10/14) 02/03/09 ?/SV CORRECTIONS(GLV!TREE) 04/12/17 MS/JA/E) ADF FS(04/04/17) BP Exploration(Alaska) by Date 20-MAY-2015 Transmittal Number: 93426 t. BPXA WELL DATA TRANSMITTAL RECEIVED Enclosed are the materials listed below. MAY 2 0 2015 (BPXA LOG DATA) AOGCC If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing OPEN HOLE Digital Log Data: 04-21, 04-22, 04-33, C-01, C-31, L1-09, L2-03, L3-15, L3-31, L4-30, L5-01, L5-15, L5-16A, L5-16AL1, L5-16AL2, L5-31, L5-33, L5-36 04-21 185-212 25ply 04-33 185-233 025445, 04-33 186-035 ,25 114(p' Please Sign and Return ne copy of this transmittal to; C-01 172-030 .25 4 i• C-31 188-006 25-7q$ gancpdc@bp.comN L1-09 185-001 254149. L2-03 185-247 )5 7.50. Doug Dortch L3-15 185-266 ,75-4-51 Petrotechnical Data Center L3-31 186-034 )5 1'452 14-30 188-101 25-753. L5-01 189-009 251-EM Attn: State of Alaska - AOGCC L5-15 188-109 ;25I-55 Attn: Makana Bender L5-16A 206-083 25-4 5G 333 W. 7th Ave, Suite 100 L5-16A L1 206-084 25 57• Anchorage, Alaska 99501 L5-16A L2 206-085 2545g. �cgNaEo MAY 2 72015 L5-31 190-130 25-1Sq L5-33 189-047 251f00• -4L5-36 189-036 Z5�(o Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage,AK 99519-6612 . STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISSIO REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate 151 Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development b Exploratory ❑ • 189 -0360 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 -6612 . 50- 029 - 21933 -00 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO- 028320 • • L5 -36 10. Field /Pool(s): e PRUDHOE BAY FIELD / LISBURNE OIL POOL 11. Present Well Condition Summary: Total Depth measured 12172 feet Plugs (measured) None feet true vertical 8899.29 feet Junk (measured) None feet Effective Depth measured 12161 feet Packer (measured) 11375 11835 feet true vertical 8892.43 feet (true vertical) 8331 8674 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 30 - 110 30 - 110 Surface 4924' 10 -3/4" 45.5# J -55 29 - 4953 29 - 3991 3580 2090 Production 11622' 7 -5/8" 29.7# L -80 28 - 11650 28 - 8538 6890 4790 Liner 756' 5 -1/2" 17# L -80 11416 - 12172 8362 - 8899 7740 6280 Liner Liner t 1 Perforation depth: Measured depth: SEE ATTACHED - a ,,"..; c 3 f , f .i` S ',....9 � I y True Vertical depth: _ _ - Tubing: (size, grade, measured and true vertical depth) 2 -7/8" 6.5# L -80 27 - 11635 27 - 8526 Packers and SSSV (type, measured and true vertical depth) 2 -7/8" Baker DB Packer 11375 8331 5 -1/2" CTC EXT CSG Packer 11835 8674 RECENED SEP 2 3 2n 12. Stimulation or cement squeeze summary: Intervals treated (measured): Aiska Oil & Gas Cons. Commission Treatment descriptions including volumes used and final pressure: Anchorage 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 381 15,104 8 609 Subsequent to operation: 419 14,753 42 545 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development ISI • Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil . 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG❑ GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Na oe La AIL i Title Petrotechnical Data Technologist Signat 31111V Phone 564 -4091 Date 9/23/2011 _. _ Form 10-404 Revised 10/2010 tpMS SEP 26 20 ( c •2C it Submit Original Only L5 -36 189 -036 PERF ATTACHMENT Sw Name Operation Date Pelf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base L5 -36 7/9/89 PER 11,875.5 11,876.5 8,703.37 8,704.08 L5 -36 7/9/89 PER 11,983.5 11,984.5 8,778.23 8,778.9 L5 -36 7/9/89 PER 11,985.5 11,986.5 8,779.58 8,780.25 L5 -36 7/9/89 PER 12,003.5 12,004.5 8,791.61 8,792.28 L5 -36 7/9/89 PER 12,007.5 12,008.5 8,794.27 8,794.93 L5 -36 7/9/89 PER 12,011.5 12,012.5 8,796.92 8,797.58 L5 -36 7/9/89 PER 12,036.5 12,037.5 8,813.37 8,814.03 L5 -36 7/9/89 PER 11,980.5 11,981.5 8,776.21 8,776.88 L5 -36 7/9/89 PER 12,071.5 12,072.5 8,836.03 8,836.67 L5 -36 7/9/89 PER 12,079.5 12,080.5 8,841.15 8,841.79 L5 -36 7/9/89 PER 12,124.5 12,125.5 8,869.58 8,870.21 L5 -36 7/9/89 PER 12,126.5 12,127.5 8,870.84 8,871.46 • L5 -36 7/9/89 PER 12,137.5 12,138.5 8,877.74 8,878.36 L5 -36 7/9/89 PER 12,139.5 12,140.5 8,878.99 8,879.62 L5 -36 7/9/89 PER 12,141.5 12,142.5 8,880.24 8,880.87 L5 -36 7/9/89 PER 12,077.5 12,078.5 8,839.87 8,840.51 L5 -36 7/9/89 PER 11,966.5 11,967.5 8,766.74 8,767.42 L5 -36 7/9/89 PER 12,032.5 12,033.5 8,810.76 8,811.41 L5 -36 7/9/89 PER 11,961.5 11,962.5 8,763.33 8,764.02 L5 -36 7/9/89 PER 11,963.5 11,964.5 8,764.7 8,765.38 L5 -36 7/9/89 PER 11,885.5 11,886.5 8,710.48 8,711.19 L5 -36 7/9/89 PER 11,887.5 11,888.5 8,711.89 8,712.6 L5 -36 7/9/89 PER 11,892.5 11,893.5 8,715.43 8,716.14 L5 -36 7/9/89 PER 11,895.5 11,896.5 8,717.55 8,718.26 L5 -36 7/9/89 PER 11,897.5 11,898.5 8,718.96 8,719.67 L5 -36 7/9/89 PER 11,902.5 11,903.5 8,722.48 8,723.18 L5 -36 7/9/89 PER 11,910.5 11,911.5 8,728.1 8,728.8 L5 -36 7/9/89 PER 11,880.5 11,881.5 8,706.93 8,707.64 III L5 -36 7/9/89 PER 11,917.5 11,918.5 8,732.99 8,733.69 L5 -36 7/9/89 PER 11,921.5 11,922.5 8,735.78 8,736.47 L5 -36 7/9/89 PER 11,929.5 11,930.5 8,741.34 8,742.03 L5 -36 7/9/89 PER 11,933.5 11,934.5 8,744.11 8,744.8 L5 -36 7/9/89 PER 11,936.5 11,937.5 8,746.18 8,746.87 L5 -36 7/9/89 PER 11,939.5 11,940.5 8,748.25 8,748.94 L5 -36 7/9/89 PER 11,914.5 11,915.5 8,730.89 8,731.59 L5 -36 7/8/96 APF 12,124. 12,144. 8,869.27 8,881.81 L5 -36 189 -036 PERF ATTACHMENT L5 -36 7/8/96 APF 12,072. 12,082. 8,836.35 8,842.75 L5 -36 7/8/96 APF 12,090. 12,110. 8,847.83 8,860.46 L5 -36 7/8/96 APF 12,004. 12,024. 8,791.94 8,805.18 L5 -36 7/8/96 APF 12,030. 12,040. 8,809.12 8,815.66 L5 -36 7/9/96 APF 11,875. 11,927. 8,703.02 8,739.6 L5 -36 7/9/96 APF 11,927. 11,937. 8,739.6 8,746.53 L5 -36 7/9/96 APF 11,937. 11,942. 8,746.53 8,749.98 L5 -36 12/15/08 BPS 11,600. 12,144. 8,500.32 8,881.81 L5 -36 1/19/09 BPP 11,600. 12,144. 8,500.32 8,881.81 L5 -36 8/27/11 APF 12,124. 12,144. 8,869.27 8,881.81 L5 -36 8/28/11 APF 12,072. 12,082. 8,836.35 8,842.75 L5 -36 8/28/11 APF 12,030. 12,040. 8,809.12 8,815.66 L5 -36 8/28/11 APF 12,090. 12,110. 8,847.83 8,860.46 . L5 -36 8/29/11 APF 11,953. 11,968. 8,757.53 8,767.76 L5 -36 8/29/11 APF 11,927. 11,942. 8,739.6 8,749.98 L5 -36 8/29/11 APF 12,004. 12,024. 8,791.94 8,805.18 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • . . ���� ����� ���_�� DESCRIPTION ��������� �������� ������ OF WORK �������� ������� ��u��v�����������z�u���u������ EVENT SUMMARY 7/24/2011 ***WSR CONTINUED FROM 7/23/2O11°°°(add perf) DRIFTED WITH 10' OF 2" DUMMY GUN, TEL AND SAMPLE BAILER. LOCATED TUBING TAIL @11.61O'8LK8/11633'ELyW(23'CORRECTION) TAGGED T7O@12.132'GLNK12155'ELM, (11'OF RAT H(JLE). SAMPLE BAILER VVAGEyWPTY ****LEFT SSV NORMALED UP TO PANEL AND LEFT WELL SHUT-IN) 027/2011 ***WELL SHUT-IN ON ARRIVAL*** ||N|T|ALT/N]35U/0/4UO SSV OPEN ON ARRIVAL RIH AND TAGGED TD AT 12154'. PERFORATED 12124�12144' WITH 2"HSO8 i 8PF6OOEC�F�EEPHASEOPJ2OO8HMXGUN � DEPTH ��{�F�F�E��TEOTOATLAS /CBLU]O DATED 1-JUNE-8S. ALL SHOTS FIRED, LAY DOWN UNIT FOR N|GHT�FlETUF�N|NK4DF{N|N{�TOF�ESUK�E . ' :PERFORATION JOB. ***CONTINUE NEXT DAY*** 8/27/2011.T7NO=25OO/2O/3B0 Temp= 8| Load tubing (pre E-Iine) Pumped 3 bbls meth, 110 bbls crude and 23 bbls diesel to load Tbg. Final WHPs Vac/20/380 :VVV.SV.GV=Ghut MV.IA,OA=Open | � | -- | i --- — 8/28/2U11|°**CONT|NUED FROM PREVIOUS DAY~** (Eline Adperf) :PERFORATED 12030'-12040' / 12072'-12082' / 12090'-12110' i .~ '(ALLPERFG DONE WITH 2"HGOOSPFOO DEGREE PHASED PJ2UU0GUNS) DEPTH CORRECTED TO ATLAS CBL LOG DATED 1-JUNE-89. CONFIRMED ALL ,SHOTS FIRED LAID EQUIPMENT DOWN FOR THE NIGHT & WILL RETURN IN MORNING TO FINISH PERFORATING 'WELL LEFTGHUT|N -- NOTIFIED DSO OF WELL STATUS ***CONTINUE 08/29/11 WSR*** 8/29/2011 ***CONTINUED FROM PREVtOUS DAY*** (Eline | / ' Adperf) RESUME PERFORATING OPERATIONS. LRS KILLED WELL AGAIN LAST NIGHT, INTIAL PRESSURES 300/0/350 PE��FC�R/A'ED|NTERVALG8D 11S37�11S42' / 11�53�11SO8' / 12O04�12O�4' � ~~ ,(ALL PERFS DONE W/ 2" HSD 6 SPF 60 DEGREE PHASED PU2000 GUNS) !DEPTH CORRECTED DATED 1-JUNE-89 ' NOTE: TRSSSV FLAPPER IS FUNCTIONING. SEE LOG FOR FULL DETAILS. HAND OVER WITH DSO PRIORTO DEPARTURE -- DSO TO POP WELL & PUT ;IN TEST 'F|NALT/K040O/O/35O 'JOB COMPLETE*** • • 8/29/2011 ° T /I /0= 1600/0/380 Load and Kill well for E -Line Pumped 3 bbl meth spear followed by '118 bbls crude down tbg t5o kill well FWHP= 300/0/380 (swab closed,wing closed swsv closed master open annulus valves open to gauges) 4 i FLUIDS PUMPED BBLS 6 METH 27 DIESEL 228 CRUDE 261 TOTAL TREE = 2- 9/16" CIW "WELLHEAD = FMC • SeY NOTES: CAT I SSSV H2S (PPM) 75 ACTUATOR = BAKER L5-36 KB. ELEV = 59.0' BF. ELEV = NA KOP = - 1300' Max Angle = 54 @ 10400' I 1922' H2 -7/8" CAM TRDP -1A TRSSSV, ID = 2.312" I Datum MD = 12268' • Datum TVD = 8900' SS CHEMICAL INJECTION MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE C 1 2017 1970 29 KBMG -L DMY BK -2 0 07/02/89 GAS LIFT MANDRELS Minimum ID = 2.205" @ 11624' ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 3056 2777 48 TE -TGPD DMY TG 0 07/02/89 2 -7/8" OTIS XN NIPPLE 3 6500 5067 45 1E-TGPD DMY TG 0 07/02/89 ' 4 8935 6762 49 TE -TGPD DMY TG 0 07/02/89 5 10864 7958 48 TE -TGPD DMY TG 0 07/02/89 6 11337 8303 41 TE -TGPD DMY RK 0 07/02/89 110 -3/4" CSG, 45.5 #, J -55, ID = 9.950" H 4953' Hi ■ 1 1)X. 1 11395' H2-7/8" BKR LOC SEAL ASSY, ID = 2.441" 1 'NI 1 11375'eImj - 17 - 5/8" X 2 -7/8" BKR DB PKR, ID = 3.250" 1 l ( 11416' I — I TOP OF SOT TIEBACK SLV 1 11424' 1 — I 7 -5/8" X 5 -1/2" BOT LNR HGR 1 I 11624' 1--12 -7/8" OTIS XN NIP, ID = 2.205" 1 12 -7/8" TBG -IPC, 6.5 #, L -80, .0058 bpf, ID = 2.441" 1-1 11635' I-- ■ I 11636' H2 -7/8" SHEAR SUB/TT, ID = 2.441" 1 7 -5 /8" CSG, 29.7 #, L -80, ID = 6.875" H 11650' I II • I 11633' I---I ELMD TT LOG UNAVAILABLE 1 PERFORATION SUMMARY REF LOG: CNL (POROSITY) DA ON 06/27/89 ANGLE AT TOP PERF: 42 @ 11875' E. I■4 1 11835' H5-1/2" CTC EXT CSG PKR I Note: Refer to Production DB for historical perf data II SIZE I SPF I INTERVAL I Opn /Sqz I DATE SEE PAGE 2 FOR PERFORATION DATA ' 11 11 1 II 1 PBTD 1-1 12161' 1 AVAVATAV+,AVAV4 1 5 -1/2" LNR, 17 #, L -80, 0.0232 bpf, ID = 4.892" H 12172' DATE REV BY COMMENTS DATE REV BY COMMENTS LISBURNE UNIT 07/03/89 ORIGINAL COMPLETION 02/03/09 ? /SV CORRECTIONS (GLV/TREE) WELL: L5 -36 01/09/01 SIS -CS CONVERTED TO CANVAS 09/20/11 JCM/ PJC RE -PERFS (08/27- 29 /11) PERMIT No: 189 -0360 03/02/01 SIS -LG FINAL API No: 50- 029 - 21933 -00 12/31/01 CH/TP CORRECTIONS SEC 1, T11N, R15E 2387' FSL & 37' FWL 03/03/07 RL DATUM MD BP Exploration (Alaska) • • BP Exploration (Alaska) Inc. -- Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 July 6, 2011 Mr. Tom Maunder 0 36' Alaska Oil and Gas Conservation Commission 333 West 7 Avenue Anchorage, Alaska 99501 � Subject: Corrosion Inhibitor Treatments of GPMA L5 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA L5 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Mehreen Vazir, at 659 -5102. Sincerely, Gerald Murphy BPXA, Well Integrity Coordinator . • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Lisburne 05 Date: 05/30/11 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date L5-01 1890090 500292190800 0.4 NA 0.4 na 1.7 5/23/2011 15-04 1861910 500292167900 Sealed conductor NA NA NA NA NA 15-05 1870690 500292174200 Sealed conductor NA NA NA NA NA 15-08 1870300 500292171100 Sealed conductor NA NA NA NA NA 15-09 1901240 500292208600 Sealed conductor NA NA NA NA NA 15-12 1870100 500292169400 Sealed conductor NA NA NA NA NA L5-13 1831840 500292105900 0.6 NA 0.6 NA 1.7 5/24/2011 15-15 1881090 500292186800 Sealed conductor NA NA NA NA NA 15-16 2060830 500292170001 Sealed conductor NA NA NA NA NA 15 -17 2042230 500292188901 0.1 NA 0.1 NA .85 5/30/2011 L5-18 1900830 500292206000 2.7 NA 2.7 NA 11.9 5/30/2011 15-19 1900680 500292205200 P&A 9/24 NA NA NA NA NA L5-21 1870570 500292173200 Sealed conductor NA NA NA NA NA L5-23 1900500 500292203900 Sealed conductor NA NA NA NA NA L5-24 1850660 500292132700 0.1 NA 0.1 NA .85 5/30/2011 L5-25 1881350 500292188600 Sealed conductor NA NA NA NA NA L5-26 1901100 500292207900 1 NA 1 NA 3.4 5/30/2011 L5 2060700 500292171701 Sealed conductor NA NA NA NA NA 15 1870450 500292172400 Sealed conductor NA NA NA NA NA L5-31 1901300 500292209100 0.8 NA 0.8 NA 3.4 5/28/2011 L5-32 1881020 500292186100 0.3 NA 0.3 NA .85 5/28/2011 15 -33 1890470 500292194300 0.3 NA 0.3 NA .85 5/28/2011 c ) L5-34 1980850 500292288300 0.3 NA 0.3 NA .85 5/28/2011 L5-36 1890360 500292193300 0.6 NA 0.6 NA 1.7 5/28/2011 04/18/11 Scb!berger NO. 5719 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambrel' Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job K Log Description Date BL Color CD 01 -16 BCRD -00092 PRODUCTION PROFILE (7 , — or) V 03/11/11 1 • • / - 1 14 -12 BBKA -00091 PRODUCTION PROFILE • ' 03/05/11 1 __ei 1 Z -02A BJOH -00013 INJECTION PROFILE a (Y ♦ Zir— 1 13-09 BDAD -00038 LDL fill( � ' 03/19/11 1 • 1 L5 -36 BJOH -00014 PRODUCTION PROFILE (5 (0 03/16/11 1 ♦ • / 1 1 L4 -15 BBSK -00059 PRODUCTION PROFILE 03116/11 1 _ / 03 -25A BG4H -00042 PRODUCTION PROFILE ) S '� 03/18/11 1 1 Z -112 BL65 -00021 MEM PROD PROFILE a 03/01111 1 1 F -35 BG4H -00037 RST j' — CY j 02/23/11 1 0 ( 1 J -17C BAUJ -00061 MCNL �j 1( 02/09/11 1 _p 1 III • • PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Sune 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 C. '„ -1 N . 1 '20'1` • I RECEIVED APR 19 2UH . o• ,r._ e .. n kidome ~ r ~;, , ~;: BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. ~~ If you have anv auectinnc nleacP enntart Tna T act„flto ar ron~~ctin nnni Date 12-16-2008 Transmittal Number:93026 - \~ J" Delivery Contents SW Name Date Contractor Run To De th Bottom De th Descri tion PRODUCTION PROFILE L3-23 09-08-2008 HALLIBURTON 1 10964 11476 WITH MAPS CD-ROM -PRODUCTION L3-23 09-08-2008 HALLIBURTON PROFILE WITH MAPS PRODUCTION PROFILE L1-09 10-20-2008 HALLIBURTON 1 11016 11869 WITH MAPS CD-ROM -PRODUCTION L1-09 10-20-2008 HALLIBURTON PROFILE WITH MAPS PRODUCTION PROFILE L5-36 09-12-2008 HALLIBURTON 1 11748 12120 WITH MAPS CD-ROM -PRODUCTION L5-36 09-12-2008 HALUBURTON PROFILE WITH MAPS PRODUCTION PROFILE L5-32 09-09-2008 HALLIBURTON 1 0 9615 WITH MAPS CD-ROM -PRODUCTION L5-32 09-09-2008 HALLIBURTON PROFILE WITH MAPS PRODUCTION PROFILE L5-24 12-05-2008 HALLIBURTON 1 10110 10640 WITH MAPS CD-ROM -PRODUCTION L5-24 12-05-2008 HALLIBURTON PROFILE WITH MAPS ,~ ~ , ;~ i /~_ Please -Sign and Return one copy of this transmittal Thank You, Joe Lastufka Petrotechnical Data Center 5 BPXA ~ 1.t~fir <~ ~~ 2~~wr~ Exxon ~a=~~~~.~~~ ' ~ ~ DNR AOGCC Analisa Clopton File Room Kristin Dirks Christine Mahnken Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 05/13/08 ~L~'p~~Gl"\74~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wau InL. e ~.7~~~~~ J~l~ ~ 2008 l~~s 3~ NO. 4702 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 1(10 Anchorage, AK 99501 MPS-11 12017492 CEMENT & CORROSION LOG 7(~~--(/'~ ~/a 04/22/08 v ivl 1y 1-21/K-25 12061694 PRODUCTION LOG ~D ~d~ ~ _~~~ 04/18/08 1 1 GNI-04 12057606 ~ STEP RATE INJECTIVfI r I t5 i U~ / ~3c/ 04/23/08 1 1 L-220 11975763 USIT 04/22/08 1 1 MPS-31 11962598 USIT C 05/03/08 1 1 X-17 12034894 USIT - ~ • Oho ~ ~ 05/03/08 1 1 04-47 11978458 MEM LDL ~9 L("t5 3 3 05/01/08 1 1 Y-07A 11966254 TEMP & PRESS LOG ap'~- - ~ 05/02/08 1 1 L5-36 11975768 PRODUCTION PROFILE WlFSI -p J 04/28/08 1 1 Z-112 40016350 OH MWb/LWD EDIT ~- 02/15/08 2 1 Z-112 PB 40016350 OH MWD/LWD EDIT p'~- a 02/11/08 2 1 Y-07A 11962781 CH ED17 PDC GR /SCMTI '~~ ~(~~ ~ ~~-( 02/03/08 1 L2-16 11975760 RST ~ l j "~J=~-•~- ~ ~-~~ 03/31/08 1 1 L2-33 11998999 RST ~ - 04/01/08 1 1 Li-14 11999000 RST ~ ~ 04/02/08 1 1 D-266 40016518 OH MWD/LWD EDIT - 5 02/21/08 1 1 DI CACC A!`Il IJ A\A/1 Cn/'~C nc n ~InT nv e.l~wl lwlw ww.w ww-..w.....w ~..~ ~~~.. -. _.. __ ------•----~~••~~~.. . .... v.v......w .+.~V IIV1 VIllYIIYV VIYG VVr\ GNlin 1V. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 '' Date Delivered: , ~„, ;~"j @ I a 1 J,.. Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 ,' Anchorage, AK 99503-2838 ~ ATTN: Beth Received by: ~ `~ • ~~ ON OR BEFOI STATE OF.ALASKA ALAS~ AND GAS CONSERVATION COMMISC_~I REPOR F SUNDRy WELL OPERATIONS · Operations performed: Operation shutdown __ Stimulate ~ Plugging __ Pull tubing __ Alter casing __ Repairwell ~ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage AK 99510 4. Location of well at surface 2889' FNL, 5241' FEL, Sec. 1, T11N, R15E At top of production interval 1054' FNL, 1494' FEL, Sec. 35, T12N, R15E At effective depth 715' FNL, 1523' FEL, Sec. 35, T12N, R15E At total depth 704' FNL, 1515' FEL, Sec. 35, T12N, R15E Perforate _ 12. Present well condition summary Total Depth: measured: 12172 feet true vertical: 8899 feet Effective Depth: measured: 12161 feet true vertical: 8893 feet Casing Length Size Cemented Conductor 80' 20" 2150# Poleset Surface 4953' 10 1650 sx AS III & 350 sx Class G Intermediate 11650' 7 5/8" 507 xs Class G Liner 756' 5 1/2" 165 SX SS II Other __ 3. Datum elevation (DF or KB) RKB 59 feet 7. Unit or Property name LISBURNE UNIT 8. Well number L5-36 9. Permit n_umber/approval number 10. APl number 500292193300 11. Field/Pool Lisburne Pool 5. Type of Well: Development _~. Exploratory ~ Stratigraphic ~ Service ~ Plugs (measured) Junk (measured) None. None. Measured depth Trueverti~ldepth 110' 110' 4953' 3991' 11650' 8538' 12172' 8899' Perforation depth: measured 11875-11927', 11927-11937', 11937-11942', 11953-11968', 12004-12024', 12030-12040', true vertical 8644-8680', 8680-8687', 8687-8690', 8698-8708', 8732-8746', 8750-8756', Tubing (size, grade, and measured depth) 2 7/8 in. 6.5# L-80 @ 0-11634' MD Packers and SSSV (type and measured depth) 3 1/4 X 7 5/8 PKR @ 11375' MD, 2 1/3 x3 1/2 TRSSSV @ 1922' MD Please mferto a~ached. 13. Stimulation or cement squeeze summary Intervals' treated (measured) Treatment description including volumes used and final pressure , R E,1VED ORI$1NAL Representative Daily Avera.qe Production or Inlection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation 580 13000 Subsequent to operation 600 13000 4 4 Status of well classification as: Suspended Date 15. Attachments 116. Copies of Logs and Surveys run __ I Daily Report of/Well Operations ~ Oil ~x Gas 17. I hereby c~/~,~in~s true and correct to the best of my knowledge. $igned /I/I /fl/I/! " / ~ "'-'--- Title Tubing Pressure 500 500 Service Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE L5-36 DESCRIPTION OF WORK COMPLETED ACID STIMULATION TREATMENT Date Event Summary 01-18-1997 Performed CT Acid Stimulation job. Pressure tested pumps and lines to 4000psi, then pumped the following fluids schedule: a) 63 bbls Crude at 3 bpm, followed by b) 285 bbls 12% HCl/10% DAD Acid at 2 bpm with 286 bbls Crude at 1.5 bpm, followed by c) 270 bbls Seawater at 5 bpm, followed by d) 60 bbls Crude, followed by e) 10 bbls Methanol Water, followed by f) Shutdown. Well: L5-36 TRSSSV-- PKR -- NIP -- Perf -- Perf - Perf Perf Perf Per/ Perf -- Perf - Perf - Perf - GPMA WEB Date: 515/99 APl: 500292193300 ssSV Type: CAT I - SSSV Annular Fluid: LIFT GAS Reference CNL Log: (POROSITY) DA Last Tag: 12172 Last Tag Date: Well Type: PROD Orig Compltn: Last W/O: Ref Log Date: 6/27/89 TD: 12172 ftKB Max Hole 54 deg ~ 10400 Angle (~ TS: deg ~ Angle (~ TD: 51 deg ~ 12172 Rev Reason: Last Update: 5/19/98 Angle: Date Note 7/3/89 Minimum ID: 2.205" OTIS XN NIPPLE ~ 11622' ELMD EXTERNAL CASING PACKER FROM 11842-11876 ELMD Date Note 713/89 Well Status: ACTIVE 713/89 Tubing Hanger: FMC SLIMHOLE ~ 35' MD Last Tag Depth @ 12172 Top Of[luid Depth ~ 11691 ........................!~~ ~:~ ~~. ................ ~:~;~.-.:.~ .......... ~. · ~ -.~ ~:~: ................ ~ ............. ~ ................ Depth 'I'VD Type DeecHption ID 1922 1886 TRSSSV 2-7/8" CAMCO TRDP-1A SSSV, ID=2,312" 2.312 11375 8331 PKR 2-7/8" X 7-5/8" BAKER DB PACKER, ID=3,25" 3.250 11622 8517 NIP 2-7/8" OTIS XN NIPPLE, ID=2.205" (ELMD) 2.205 11634 8526 TT 2-7/8" SHEAR SUB/TT~ ID=2.441" (11633' ELM~ 2.441 Size Weight Grade Top Btm Feet DeecHptlon 10.750 45.50 J-55 0 4953 4953 SUR. CASING 7.625 29.00 L-80 0 11650 11650 PROD. CASING 5.500 17.00 L-80 11416 12172 756 LINER Size Weight Grade Top Btm Feet Description 2.875 6.50 L-80 0 11634 11634 TUBING-IPC Stn MD TVD Man Man VMfr VType VOD Latch Port TRO Date VIv Mfr Type Run Comment 1 2016 1969-KBMG-L CA E 1.0 BK-2 0.000 0 ClM Stn MD TVD Man Man VMfr VType VOD Latch Port TRO Date VIv Mfr Type Run Comment 1 3055 2777rE-TGPE TE D-14R 1.5 TG 0.000 0 GLM 2 6500 5066rE-TGPE CA RD 1.5 TG 0.000 0 5/29/95 GLM 3 8935 6762rE-TGPE TE D-14R 1.5 TG 0.000 0 GLM 4 10863 7958rE-TGPr' TE D-14R 1.5 TG 0.000 0 GLM 5 11336 83021'E-TGPE CA RD 1.5 RK 0.000 0 5/29~95 GLM Interval TVD Zone Status Feet SPF Date Type Comment 11875 - 8703 - 8739 52 4 7/8/96 APERF ADDPERFS 11927 11927- 8739- 8746 11937 11937- 8746- 8750 11942 11942- 8750-8757 11953 11953- 8757- 8767 11968 11968- 8767- 8792 12004 12004- 8792-8805 12024 12024- 8805-8809 12030 12030- 8809-8815 12040 12040- 8815-8836 12072 12072- 8836- 8842 12082 12090- 8848- 8860 12110 12124- 8869-8882 12144 10 8 718/96 APERF ADDPERFS 5 4 718/96 APERF ADDPERFS C 11 0 Sqz SELECTIVE SHOTS (30) 15 4 7/8~96 APERF ADDPERFS C 36 0 Sqz SELECTIVE SHOTS (30) 20 4 7~8/96 APERF ADDPERFS C 6 0 Sqz SELECTIVE SHOTS (30) 10 4 7~8~96 APERF ADDPERFS C 32 0 Sqz SELECTIVE SHOTS (30) 10 4 7~8~96 APERF ADDPERFS 20 4 718/96 APERF ADDPERFS 20 4 7~8~96 APERF ADDPERFS STATE OF A~SKA ALASK~ AND GAS CONSERVATION COMMIS REPORT F SUNDRY WELL OPERATIONS Operations performed: Operation shutdown __ Stimulate __ Plugging Pull tubing m Alter casing _ Repair well __ Perforate _~ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 2889' FNL, 5241' FEL, Sec. 1, T11N, R15E At top of production interval 1054' FNL, 1494' FEL, Sec. 35, T12N, R15E At effective depth 715' FNL, 1523' FEL, Sec. 35, T12N, R15E At total depth 704' FNL, 1515' FEL, Sec. 35, T12N, R15E 5. Type of Well: Development Exploratory Stratigraphic Service Datum elevation (DF or KB) RKB 59 feet 7. Unit or Property name LISBURNE UNIT 8. Well number L5-36 9. Perj~Jt~umber/approval number ~'~ ~36 / 10. APl nOmber 500292193300 1. Field/Pool Lisburne Pool 12. Present well condition summary Total Depth: measured: 12172 feet true vertical: 8899 feet Effective Depth: measured: 12161 feet true vertical: 8893 feet Casing Length Size Cemented Conductor 80' 20" 2150# Poleset Surface 4953' 10 1650 sx AS III & 350 sx Class G Intermediate 11650' 7 5/8" 507 xs Class G Liner 756' 5 1/2" 165 sx SS II Plugs (measured) Junk (measured) None. None. Measured depth 110' 4953' 11650' 12172' True vertical depth 110' 3991' 8538' 8899' Perforation depth: measured 11875-11927',11927-11937',11937-11942',11953-11968',12004-12024',12030-12040', truevertical 8644-8680',8680-8687',8687-8690',8698-8708',8732-8746',8750-8756',8777-8783', Tubing (size, grade, and measured depth) 2 7/8 in. 6.5# L-80 @ 0-11634' MD Packers and SSSV (type and measured depth) 3 1/4 X 7 5/8 PKR @ 11375' MD, 2 1/3x3 1/2 TRSSSV @ 1922' MD 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED Naska 011 & Gas Cons. Commt~ion ORIGINAL 14. Representative Daily Avera.qe Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation 670 13000 4 Subsequent to operation 670 13000 4 15. Attachments J16. Copies of Logs and Surveys run m I Daily Report of Well Operations .~ Oil ~ Gas 17., hereby certify./tl//af/~~s true and correct to the best of my knowledge. Signed ///~f//,/f./y/~ ~ '~ --' Title S/?. ~J'G ~</¢~. Tubing Pressure 550 550 Status of well classification as: Suspended __Service Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE L5-36 DESCRIPTION OF WORK COMPLETED ADDED PERFORATIONS Date Event Summary 07-08-1996 RIH w/2 1/8" EJ III guns and added perforations at: 11875' 11927' 11937' 11953' 12004' 12030' 12072' 12090' 12124' - 11927' MD @ 4SPF - 11937' MD @ 8 SPF - 11942' MD @ 4 SPF - 11968' MD @ 4 SPF - 12024' MD @ 4 SPF - 12040' MD @ 4 SPF - 12082' MD @ 4 SPF - 12110' MD @ 4 SPF - 12144' MD @ 4 SPF All shots at 0 (zero) deg phasing and 0 (zero) deg orientation. Well: L5-36 GPMA WEB Date: $15199 TRSSSV-- PKR -- NIP -- Perf -- Perf - Per[ Per[ Per[ Per[ -- Per[ - Per[ - Perf -- APl: 500292193300 SSSV Type: CAT I - SSSV Annular Fluid: LIFT GAS Reference CNL Log: (POROSITY) DA Last Tag: 12172 Last Tag Date: Well Type: PROD Orig Compltn: Last W/O: Ref Log Date: 6127/89 TD: 12172 ftKB Max Hole 54 deg (~ 10400 Angle ~ TS: deg @ Angle ~ TD: 51 deg @ 12172 Rev Reason: Last Update: 5/19/98 Date Note 7~3/89 Minimum ID: 2.205" OTIS XN NIPPLE (~ 11622' ELMD EXTERNAL CASING PACKER FROM 11842-11876 ELMD ~i~'~:?!~:' i~: :.~ ~ ~i' : ~ ; i:I Date Note 7/3/89 Well Status: ACTIVE 7/3/89 Tubing Hanger: FMC SLIMHOLE @ 35' MD Last Tag Depth @ 12172 To Of Fluid Depth ~ 11691 Depth TVD Type Description 1922 1886 TRSSSV 2-7/8" CAMCO TRDP-1A SSSV, ID=2.312" 11375 8331 PKR 2-7~8" X 7-5~8" BAKER DB PACKER, ID=3.25" 11622 8517 NIP 2-7~8" OTIS XN NIPPLE, ID=2.205" (ELMD) 11634 8526 TT 2-7/8" SHEAR SUB/TT ID--2.441" 11633' ELMD Size Weight Grade Top Btm Feet Description 10.750 45.50 J-55 0 4953 4953 SUR. CASING 7.625 29.00 L-80 0 11650 11650 PROD. CASING 5.500 17.00 L-80 11416 12172 756 LINER ID 2.312 3.250 2.205 2.441 Weight Grade Top Btm Feet Description 2.875 6.50 L-80 0 11634 11634 TUBING-IPC Stn MD TVD Man Man VMfr VType VOD Latch Port TRO Date Vlv Mfr Type Run Comment 1 2016 1969-KBMG-L CA E 1,0 BK-2 0.000 0 CIM Stn MD TVD Man Man VMfr VType Mfr Type 1 3055 2777rE-TGPE TE D-14R 2 6500 5066 rE-TGPE CA RD 3 8935 67621'E-TGPE TE D-14R 4 10863 7958rE-TGPE TE D-14R 5 11336 8302 I'E-TGPE CA RD V OD Latch Port TRO Date Vlv Run Comment 1.5 TG 0.000 0 GLM 1.5 TG 0.000 0 5~29/95 GLM 1.5 TG 0.000 0 GLM 1.5 TG 0.000 0 GLM 1.5 RK 0.000 0 5~29/95 GLM I Interval TVD 11875- 8703-8739 11927 11927- 8739- 8746 11937 11937- 8746- 8750 11942 11942- 8750- 8757 11953 11953- 8757-8767 11968 11968- 8767-8792 12004 12004- 8792-8805 12024 12024- 8805-8809 12030 12030- 8809-8815 12040 12040- 8815-8836 12072 12072- 8836-8842 12082 12090- 8848-8860 12110 12124- 8869-8882 12144 Zone Status FeetSPF Date Type Comment 52 4 7~8~96 APERF ADDPERFS 10 8 7~8~96 APERF ADDPERFS 5 4 7/8~96 APERF ADDPERFS C 11 0 Sqz SELECTIVE SHOTS (30) 15 4 7~8~96 APERF ADDPERFS C 36 0 Sqz SELECTIVE SHOTS (30) 20 4 7/8/96 APERF ADDPERFS C 6 0 Sqz SELECTIVE SHOTS (30) 10 4 718196 APERF ADDPERFS C 32 0 Sqz SELECTIVE SHOTS (30) 10 4 7~8~96 APERF ADDPERFS 20 4 718196 APERF ADDPERFS 20 4 718196 APERF ADDPERFS TYpe of Request: 2. Name of Operator ..... ~ STATE OF A~KA COMM~~ ~ OIL AND GAS ~SERVATION REPORT OF SUNDRY WELL OPERATIONS ARCO Alaska, Inc .... 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at SurfaCe ' 2387' FSL, 37' FWL, Sec. 1, T11N, R15E, UM At top of productive Interval 1054' FNL, 1494' FEL, Sec. 35, T12N, R15E, UM At effective depth 715' FNL, 1523' FEL, Sec. 35, T12N, R15E, UM At total depth 715' FNLr 1524' FELl Sec. 35~ T12N~ R15Er UM '12. Present well condition summary Total Depth: measured 1 21 7 2' feet true vertical 8 8 9 9' feet Operation Shutdown Stimulate X Pull tubing Alter casing Repair well ,5. Type of Well: Development Exploratory _ Stratigraphic -- Service ORIGI. L feet ii Plugging Perforate _ Pull tubing O t h e r 6. Datum elevation (DF or KB) RKB 56' 7. Unit or Property name PRUDHOE/LISBURNE UNIT 8, Well number L5-36 9. Permit number/appro, val number i0. API number 50-029-21933-00 11. Field/Pool LISBURNE OIL POOL Plugs (measured) 4973 (KOP)-8607' w/1157 sx Cl G Cement Effective depth: measured 1 21 6 1 ' feet true vertical 8893' feet Junk (measured) Casing Length Size Structural Conductor 8 0' 2 0" Surface 491 4' 10- 3/4" Intermediate Production 1 1 61 5' 7 -5/8" Liner 7 5 6' 5- 1/2" Perforation depth: measured 11876-12142' true vertical 8644-8822' Tubing (size, grade, and measured depth) 2-7/8" L-80, tbg w/tail @ 11634' WLM Packers and SSSV (type and measured depth) Cemented Measured depth True vertical depth 2150 lb. Poleset 1 1 0' 1650 sx AS III & 4953' 350 sx Class G-Top Job w/118 sx ASI 507 sx Class G 11 6 50' 165 sx SS II 1 1416-12172' squeezed lap w/100 sx RFC 8, 100 sx 110' 3991' 8538' 8368-8899 ECEIVED JUN - 8 1992 Alaska Oil & Gas Cons. Commisstor /~chorag8 External casing pkr at 11835' md, DB Pkr @ 11375' md, & camco TRDP SSSV @ 1922' md Stimulation or cement squeeze summarY Intervals treated (measured) Wahoo 4,3 Treatment description including volumes used and final pressure please refer !o the attached Re0resentative Dally AveraQe prOdUCtion Or Iniectlon Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 3O5 4677 1 536 Subsequent to operation 2095 6341 7 59O 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run m Water Injector _ Dally Report of Well Operations X Oil ~ Gas , Suspended "17. I herebY Certify that the foregoing Is true and cOrrect to the best of my knowledge. Service Form 10-404 Rev 05/17/89 Title Lisburne Operations Engineering Aide Date SUBMIT IN DUPLICATE Date 7/13-15/91: Lisburne Well L5-36 Stimulation Procedure Event Rigged up BJ Services. Pressure tested lines - ok. Matrix addized Wahoo 3 and 4 perforations from 11,876' to 12,142' MD with the following fluids: 1,458 BBL Emulsified Acid 852 BBL Crude Return well to production. RECEIVED JUN - 8 1992 Alaska 0il & Gas Cons. CommisSiOn Anchorage .® ARCO ALASKA INC. LISBURNE ENGINEERING ' ~DATE: FROM: September 12, 1991 · Laura S. Lahrson ENCLOSED IS THE FOLLOWING DATA FOR LISBURNE: Log: Well /L5o31 .- ,~,~IZ-17 ~'~'~5-17 ,/' ~32 Type Run Perforating Record 1 Perforating Record 1 Production Profile 1 Jewelry Log 1 Production profile 1 Dual Propagation Resistivity-GR-MD 1 Dual Propagation Resistivity-GR-TVD 1 Tape: 5,.,~~ Well L4-36 · Report Well ~-32 Type LIS Tape DPR-RWD Data (with report) Type Final Well Report RUn Run Date/_ / Company 8/9/91 q/~)/q{ Schlumberger 8 / 19/91 Schlumberger 8/7/91 Camco ~ 8/8/91 Camco 8/8/91 Camco 8/7-19/91 Teleco 8/7-19/91 Teleco Run Date 7/23/91 8/2s/9 Date 9/4/91 Company Atlas Teleco Company Teleco SIGN AND RETURN TO: LAURA S. LAHRSON; ATO 409 ARCO ALASKA, INC. P.O. Box 100360 ANCHORAGE, ALASKA 99510-0360 RECEIVED BY: Exxon BPX AC)GCC D&M TRANSMITTAL # 649 LAQ STATE OF ALASKA ~0 A OIL AND GAS CONSERVATION COMMISSI APPLICATION FOR SUNDRY APPROVALS ' 1. '1 ype OT Hequesc Abandon' SUspend operatiOn Shutdown Re-enter suspended well .. ' Alter casing ,. Repair well Plugging Time extensi~..._. Stimulate..~_ Change approved program Pull tubing Variance Per~orate..._. Other.. Well: 6. Datum elevation (DF or KB) 2. Name of Operator 5. Type"'°f-velopment~uu ARCO ALASKA INC. RKB 56' feet ..... Exploratory . ' ' ' 3. Address Stratigraphic... 7. Unit or Property name P.O. BOX 100360 ANCH. AK 99510 Service Prudhoe/Lisbume Unit 4. Location of well at surface 8. Well number 2387' FSL, 37' FWL, Sec. 1, T11 N, R15E,UM L5-36 At top of productive interval 9. Permit number 1054' FNL, 1494' FEL, Sec. 35, T12N, R15E, UM 88-36 At effective depth 10, APl number 715' FNL, 1523' FEL, Sec. 35, T12N, R15E, UM 50-029-21933 At total depth 11. Reid/Pool 707' FNL, 1524' FEL, Sec. 35, T12N, R15E, UM LISBURNE OIL POOL 12. Pre. sent well condition summa.ry i oral aepth: measurea 12172' feet Plugs (measured) 4973' (KOP) - 8607 w/1157 sx CIG cement true vertical 8899' feet Effective depth: measured 12161' feet Junk (measured) NONE true vertical 8893' feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 80' 20" 2150 lb. Poleset 110' 11 O' Surface 4914' 10-3/4" 1650 sx AS III & 4953' 3991' Intermediate 350 sx Class G-Top Job w/118 sx ASI Production 11615' 7-5/8" 507 sx Class G 11650' .~ 8538' Liner 756' 5-1/2" 165exes I, 11416'-12172' squeezed lap w/100 sx RFC & 100 sx G PerforatiOn depth: Measured Depth 11876'-12142' True Vertical Depth 8644'-8822' - '1991 Tubing (size, grade, and measured depth) 2-7/8" L-S0, tbg w/tail @ 11634' WLU AIEISl{a.Oii & Gas Cons. Commis', Packers and SSSV (type and measured depth) External casing pkr at 11835' md, DB Pkr @ 11375' md, & Camco TRDP SSSV @ 1922' md 13. Attachment's 'Description s~mmary of Proposal--}[ Detailed operati°nl~ program BOP sketch..___ 14. Estimated date fc;r comm'enci'ilg' operatiOn ' ' 15. Status of well classifi~ltion as: Ju, !y ,11,199! ...... .. 16. If proposal was verbally approved Oil_~... Gas Suspended . Service Name of approver Date approved 17. I'l~ereby certify that the fo;e~l°ing is' true and COrreCt to the best of my knowledge. Sioned~'~' ~_~ Z~ . T.E. Krawietz Title: Sr. Operation E ~n~jr, AT0 484 Date 7- _t.~' ~- ,~'/ , ,,,~, ,, FOR COMMISSION USE ON, LY Condition~ of approval:' Notify commission so representative my witness Plug integrity _ BOP Test Location clearance ...... Mechanical Integrity Test... SUbsequent form requir~'~ Approved by order of the Commission ,~.Rr~_r!~lj' Commissioner Date'"'~ Form 10-403 Rev 06/15/88 __ IN~L~.,61~;~"~.~- ;~ SUBMIT IN' ~'RIPLICATI= Lisburne Well L5-36 Stimulation Procedure . , . , Pull gas lift valves and install dummy GLV's. RU stimulation company. Well control provided by surface chokes and production valves. Matrix Acidize Wahoo 3 and 4 at maximuTM treating pressure of 4,500 psi with the following stimulation fluids: 1500 bbls 30:70 crude/10% HCL emulsified add. · 450 bbls crude. Release service company and open well to flow. Static BHP = 4,179 psig at 8,600' ss. R EIVEI) JUL - $'t°o~J1 011 & Sas Con~, gom~ssion :Anohorage ~," ' ~ STATE OF ALASKA · - . A-LASK~IL AND GAS cONSERVATION C~'MISSION, 0 [{ I G ~ N WELL COMPLETION,OR-REC.O. MPLETION ,REPORT AND -LOG Classification of Service Well I Status of Well OIL.,~ GAS [] SUSPENDED [] ABANDONED [] SERVICE I-'1 . 2. Name of Operator 7. Perrr~i~..l~u~rn'ber' ARCO Alaska, Inc. w 3. Address 8. APl Number P.0. Box 100360, Anchorage, AK 99510-0360 50- 029-21933 ,, 4. Location of well at surface i: ......... 9. Unit or Lease Name ' 2387' FSL, 37' FWL, Sec. 1, TllN, R15E, UN ; LOC'A~Ii Prudhoe Bay Untt/Ltsburne At Top Producing Interval VEJ~II~I~J;) ;~ "10. Welt Number 105/+' FNL, lb,9~' FEL, 5ec.35, T12N, R15E, UN S~rf~ L5-36 At Total Depth H~ ~__, ' 11. Field and Pool -- 707' FNL, 152~' FEL, $ec.35, T12N, R15E, LIN Prudhoe Bay Field , 5. Elevation in feet (indicate KB, DF, etc.) [ 6. Lease Designation and Serial No. Li sburne 0i l Pool RKB 56'I ADL 28320 12. Date Spudded03/28/89 13. Date T.D. Reached05/20/89 14' Date C°mp" Susp' °r Aband' ! 15' Water Depth' if °ffsh°re 116' N°' °f c°mPleti°ns07'/10/89* N/A feet MS L 1 17. TotaIDepth(MD+TVD) 18.pIugBackDepth(MD+TVD) l'.OirectionalSu've¥ I 20. Depth where SSSV ,et 121.Thickness of Permafrost 12172'MD/8899'TV[ 12161'MD/8893'TVD YES ~[] NO I-I 1923' feet MD 1900' (approx.) 22. Type Electric or Other Logs Run Temp loq~ Depth determination lo.g~ ._CNSL, CNL/GR. C~R/CCL/CBL. Gyro .. 23. CASING, LINER AND CEMENTING RECORD , SETTING DEPTH MD' · CASING SIZE WT. PER FT. GRADE !TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ,, 20" 9l. 5# ~1-40 Surf . 'i10' 30" .. 2150# · l(~-.~J/~" /~.5# .I-C~c~ S~rf. /~c~c~, lt-'l/~' l~,r~t3 ~v A_~, III X. lr~t .v ~1~.~ 24. Perforations open to Production {=D+TVD of Top and Bottom and 25. ~ ............ TUBI~I~ R~rC0~D interval, size and number) SIZE DEPTH SET {MD) PACKER SET {MD) See attached '2'7/8' 11636' 11835~ 11375' (WLH).. 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD')' AMOUNT & KIND OF MATERIAL USED ,, Plug @ ~973' (KOP)-;t607' 1'157 sx C]ass 'EZsv (~: 1~2'161~, plug! @ 9000' 500 sx Class G "1i510'-~11'518' (ori~ hole) 750 sx Class 11550'-11750' (lost circ) 2050 sx Class ,,, 27. N/A pRODUcTION TEST' See at~:ached well work log (7/10/89) for Acid Date First Production I Method of Operation (Flowing, gas lift, etc.) Date of Test HOurs Tested PRODUCTION FOR oIL-BBL GAS-MCF WATER~BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I~ I Flow Tubing casing Pressure CALCULATED _~' OIL-BBL GAS-MCF WATER-BBL 0IL (~'RAVITY-API~o~ "' Press. 24-HOUR RATEI~ 28. CORE DATA Brief description of lithology porosity fractUres apparent dips and presence Of oil gas or water. Submit core chips. ~'~,,_ .... ~ ,one ' · - -7 '~'/.~ -- · NOTE: Drilled RR 5/28/89. Tubing run 7/3/89. Perforated wel~ 7/9/89. Ac'Id job/'7/10/89. 081/WC6 ~s G fo. Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS ...... ,, , , NAME .., Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. , Top Wahoo Zone 6 '1'1690' 8567' Top Wahoo Zone 5 1'1743' 8607' Top Wahoo Zone 4 1'1854' 8688' Top Wahoo Zone 3 '12'1 'I 6' 8864' , ,, 1 le] ir ISwTo rOkF ATT/kCHMENT~S Logs(dated 77'10/89 & 7/9/89) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ (~~ Drilling Analyst Signed ~ ~f~/'~lA~,.~/ ~, . .. Title Date ~-~' ?0 ---- /I ...... ,' ...... INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the I~roducing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Item Well Completion or Recompletion Report and log L5-36 (continued) 24: Perforations M D TVD 11878 87O5 11883 8708 11888 8712 11890 8714 11895 8718 11898 8720 11900 8721 11905 8725 11913 8730 11917 8732 11920 8735 11924 8738 11932 8743 11 936 8745 11 939 8749 11942 8751 11963 8765 11965 8766 11968 8768 11982 8778 11985 8780 11987 8781 12005 8794 12009 8795 12013 8799 12034 8812 12038 8815 12073 8837 12079 8841 12081 8842 12126 8870 12128 8872 12134 8876 12141 8880 12143 8881 WELL WORK LOG Well # L5-36 Date: 7/9/89 Work performed: PI~RFORATE WAHOO 3 & 4 Cost: Time Summary O83O O94O 1030 1036 1130 1152 1202 1206 1206 1207 1208 1300 1328 1416 1425 1430 1518 1545 1635 1639 1644 1755 1900 SWS MIRU PT BOPS to 3500 PSI; OK. PT Lub to 3500 PSI RIH w/ 2-1/8" hyperdome w/ 11 shots At 11960, PUH to tie in to short jts. RIH to tag btm. Tag & PUH Complete tie in, log from PBTD to 11600. RIH to perf depth Park @ 12121 (top shot 18' from CCL). Shoot 12134, 41,43 Park @ 12111.5 (top shot 14.5' from CCL). Shoot 12126, 128 Park @ 12068 (top shot 11' from CCL). Shoot 12079, 81 Park @ 12064 (top shot 9' from CCL). Shoot 12073 Park @ 12031 (top shot 7' from CCL). Shoot 12013, 34, 38. PUH logging collars I:C(3-1. Out of hole. All shots fired. PT to 3500 RIH w/ 2-1/8" hyperdome At 12100, log up for tie in Tie in complete, prep to perf Shoot 11924,32,36,39,42,63,65,68,82,85,87,12005,09. PUH to log collars Out of hole. All shots fired RIH w/ 2-1/8" hyperdome At 12100, log up for tie in Tie in complete, prep to perf Shoot 11878,83,88,90,95,98,11900,05,13,17,20. PUH to log collars. POOH Out of hole. All shots fired Rig down DRILLING SUPERINTENDENT WELL WORK LOG Well # L5-36 Work performed: BALL OUT ACID JOB Cost: 1 9746.68(B,I)/4200,00(diesel) Date: 7/10/89 Time Summary - 07OO O9OO 0927 O943 0940 1001 1007 1012 1017 1030 1045 1053 1115 MIRU. BJ 7-5/8" brought up to 2400 psig PT hardline to 5500 psig; OK. Safety meeting. Begin pumping acid 15 bbl of acid away, begin to drop balls, WHP=2610, Rate=5.7 bpm 50 bbl of acid away, switch to diesel w/EGMBE. WHP=2900, Rate=5.7 bpm 23 bbls of diesel away. Shut down to surge balls. WHP=4443 psig Restart w/ strait diesel. WHP=2400 Shut down. Surge well three times. Restart. WHP=2341 Shut down. 50 bbl diesel away. Surge balls. Restart @ 5.5 bpm Shut down. A total of 105 bbls diesel away Rig down BJ DRILLING SUPERINTENDENT UB.$URFACE DIRECTIONAL [~] UIDANCE [~ONTINUOU$ [~OOL R'E elVEfi Alaska Oil & Gas Conll, Com~ Company ARC,O, ALASKA, ZN.C ............ I I I I II I i i i IIIII I I Well Name LISB,URNE ,L5-36(2387' ,,F,S,L~,37',,F,W,L.SEC .1,T1]N,R.1.SE) _ Field/Lo~atlon, "RUDHOE BAY/L I SBU,RNE PO~,~. ~ NORTlt ~ SLOPE.ALASKA Jo~ Reference No. 73367 9-JUN-89 Lo.~gg..fl~[~ Computed PORTER 'KOHRZNG SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. LISBURNE L5-36 PRUDHOE 8AY/LISBURNE POOL NORTH SLOPEr ALASKA SURVEY OATE: 09-JUN-89 ENGINEER: PORTER METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH Z2 OEG Z5 MIN WEST ARCO ALASKA, INC. LZSBURNE L5-36 PRUDHOE 8AY/LISBURNE POOL NORTH SLOPE, ALASKA COMPUTATION D~TE: 17-JUN-89 PAGE 1 DATE QF SURVEY: 09-JUN-B9 KELLY BUSHING ELEVATION: 59.00 FT ENGINEER: PORTER INTERPOLATED LISTING BY MEASURED DEPTH FROM KB TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMU'TH DEPTH OE'PTH DEPTH OEG MIN DEG MIN ~KB ~KB ~MSL 0.00 0.00 -59.00 100.00 100.00 41.00 200.00 200.00 141.00 300.00 300.00 241.00 400.00 400.00 341.00 500.00 500.00 441.00 600.00 599.99 540.99 700.00 699.99 640.99 800.00 799.98 740.98 900.00 899.98 340.98 0 0 N 0 0 E 0 10 N 74 45 W 0 7 N 59 40 W 0 13 N 80 42 E 0 18 S 20 18 E 0 22 S 75 37 E 0 26 S 63 12 E 0 43 S 51 6 6 0 41 S 76 17 E 0 29 N 64 13 E 1000.00 999.97 940.97 I 7 1100.00 1099.88 1040.88 3 54 1200.00 1199.37 1140.37 7 11 1300.00 12'78.17 1239.17 10 23 1400.00 1396.08 1337.08 12 45 1500.00 1493.10 1434.10 15 18 1600.00 1588.98 1529.98 17 33 1700.00 1683.48 1624.48 20 52 1800.00 1775.92 1716.92 23 49 1900.00 1866.45 1807.45 26 19 2000.00 1935.09 1896.09 28 42 2100.00 2041.84 1982.84 30 59 22,00.00 2127.36 2068.36 30 54 2300.00 2213.31 2154.31 30 43 2400.00 2298.76 2239.76 32 22 2500.00 2381.49 2322.49 36 6 2600.00 2460.00 2401.00 40 23 2700.00 2533.76 2474.76 44 42 2800.00 2602.84 254~.84 47 5 2900.00 2671.29 2612.29 46 28 3000.00 2739.52 2680.52 47.41 3100.00 2807.29 2748.29 47 26 3200.00 2872.59 2813.59 50 55 3300.00 2935.23 2875.23 51 14 3400.00 2998.14 2939.14 50 52 3500.00 3061.19 3002.19 51 3 3600.00 3123.98 3064.98 51 5 3700.00 3187.11 3128.11 50 38 3900.00 3314.55 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTUR~ SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG MIN 0.00 0.00 0.00 N 0.00 E 0.02 0.00 0.02 S 0.17 W 0.19 0.00 0.11 N 0.42 W 0.28 0.33 0.20 N 0.38 W -0.05 0.24 0.06 S 0.00 W -0.29 0.74 0.22 S 0.37 E -0.92 1.60 0.74 S 0.91 E -1.63 0.40 1.25 S 1.92 E -2.28 · 0.49 1.69 S ' 2.95 E -2.67 0.83 1.90 S 3.85 E N 23 5 E -2.03 N 3 24 E 1.54 N 2 57 W 11.32 N 9 40 W 26.59 N 13 20 W 46.90 N 12 8 W 71.08 N 10 42 W 99.45 N 10 26 W 132.09 N 11 15 W 170.19 N 9 55 W 212.64 N 8 42 W 258.84 N 10 35 W 308.51 N 11 5 W 360.32 N 10 55 W 411.43 N 10 51 W 463.35 N 9 59 W 519.46 N 12 20 W 581.32 N 16 7 W 648.75 N 17 59 W 720.74 N 17 21 W 793.31 N 15 36 W 866.20 N 14 16 W 939.66 N 15 32 W 1015.29 q 16 0 W 1093.09 N 15 49 W 1170.66 N 17 19 W 1248.07 N 17 21 W 1325.57 N 16 59 W 1402.85 N 16 41 W 1479.85 N 16 21W 1556.52 0,00 N 0 0 E 0.17 S 84 25 W 0.43 N 75 37 W 0.43 N 62 0 W 0.06 S 2 46 W 0.43 S 59 15 1.17 S 50 39 2.29 S 56 55 3.40 S 60 14 E 4.29 S 63 43 E 2.05 1.03 S 4.99 2.77 N 3.25 12.75 N 3.03 27.99 N 2.05 47.84 N 2.73 71.42 N 2.29 99.23 N 3.80 131.36 N 2.54 168.76 N 2.58 210.49 N 4.80 E 4.91 S 77 53 E 5.49 E 6.15 N 63 14 E 5.37 E 13.83 N 22 51 E 3.61 E 29.22 N T 20 E 0.70 W 47.84 N 0 50 W 6.06 W 71.67 N 4 50 W 11.68 W 99.91 N 6 42 W 17.56 W 132.52 N 7 36 W 24.85 W 170.58 N 8 22 W 32.70 W 213.02 N B 49 W 1.73 2.'41 0.88 0.28 3.29 4.13 4.86 5.52 0.50 1.11 256.17 N 40.08 W 259.29 N 8 53 W 305.22 N 48.25 W 309.01 N 8 58 W 356.09 N 58.16 W 360.81 N 9 16 W 406.26 N 67.95 W 411.90 N 9 29 W 457.26 N 77.77 W 463.82 N 9 39 W 512.46 N 87.98 W 519.96 N 9 4,~ W 573.23 N 99.64 W 581.83 N 9 51 638.63 N 116.25 W 649.12 N 10 18 707.59 N 137.93 W 720.91 N 11 I W 777.02 N 160.15 W 793.36 N 11 38 W 1.91 2.35 1.83 0.69 0.35 1.15 0.56 0.46 0.33 0.80 847.07 N 181.02 W 866.20 N 12 3 W 918.19 N 199.73 W 939.66 N 12 16 W 991.38 N 219.07 W 1015.30 N 12 27 W 1066.36 N 240.40 W 1093.12 N 12 42 W 1141.10 N 261.74 W 1170.74 N 12 55 W 1215.55 N 283.68 W 1248.22 N 13 8 W 1289.80 N 307.03 W 1325.84 N 13 23 W 1363.90 N 329.93 W 1403.24 N 13 35 W 1437.84 N 352.29 W 1480.37 N 13 46 W 1511.54 N 374.18 W 1557.17 N 13 54 W JUL 2 i 1909 Oil & Gas Co.~. Pi ZZ 9T N 9'i'9'.90£ iq Z9'SSL N 8Z'696Z /4 9Z .gT N OZ'TL6Z Fl Z6'Og'L N .9£'LLgZ iq TE 'gT N OT'868Z Pt Z9°9ZL N £S"S08Z Pi 9£ .gT N 80'SZBZ Pt Sg'ZTI. N LL'£ELZ iq 0'9 9T N 89'£5LZ H ZL'L69 N T9'E99Z fl £9 9T N 96'Z89Z' Pi i6'T89 H E8'96c;Z iq 99 9T N OT'ET9Z iq 90°S99 N !;O'LZSZ iq 9'9 .gT N 06'£9c;Z iq Z'Z°£9'9 N 6T'O99Z Pi Z9 9T N 96'£LgZ Fl 9Z'°SZ9 N 9L°Z6£Z ~1 09 9T N ZT'OOgZ Fl 88°L09 N £8°TZ£Z TZ'T 9L'O LS'O L9'O S6'0 EL'O 9'E'O 9Z'T SZ'O 9Z'O 09''0 T9'O 6E'O TT°O LB'O 90'0 SS'O Z6'O SL'T 99'0 06'0 99'0 90'Z 96'0 TL'O ZO'T TG'O TS '£ LL'9 TL'O 99° 0 L£'T fg'T L9'O 99°0 6T'O £9''0 TL'O S9'0 60'£L9'9 fl 6 6 N ZT'T099 iq LS 6 N Lg''6Z£9_ R OZ OT N £9''S8T9' fl 9T IT N 9T'ETTg' R 9Z 6 N 68'09'09' Pi [ 6 N L8°896[ Pi 6S 8 N S6'968~ Pi Tg' 6 N 99'SZ$£ fl TT OT N T£'9'SL£ fl Z£ OT N 86'£89£ fi £ IT N 6£'£T9£ fl ~Z TI N 98'Z9S£ K 8£ TI N TZ'ZLg£ Pi S9' TT N SE°I09£ H 6S TI N £S'0£E£ Pi 9 ZT N £9''6SZ£ Pi 85 TI N OL'ZBT£ H 9E TI N Z9'STT£ Pt 8E TI N 99''Z9'0£ Pt 9£ TI N £0'696Z Pi AZ TI N ZS'S68Z R 9 TI N 69'ZZSZ Pi SZ TT N O0'TSZZ R 9I ZT N 9'9''089Z iq ~Z £9'OTgZ Pi T£ 9T N 86°L6[Z ~ 9 9T N SE'OZ£Z Pi S BT N Zg'ZgZZ iq B BI N B/'99TZ Fl ZS LT N TE'LBOZ fi 9 ST N 89'OTOZ ~ TS 9T N 19'.gE6T Pt ~S 9T N ET'6SST Fl ~S 9I N 99''$0£I ~ 19' [IN 89'ZEgT R If ST N HZRHIZV 'ISIO ISgFi/1SVg HZROS/XIaON AII~gA3S NOI/33S ganiaVdgO 'ZlaOH S~IVNIO~OO3 avqngNv13ga 9~q90o q~DII~gA NI~ 930 NIH 530 Hid30 HidgQ HidgO Vgs-grIs CO..LNO3) g~ idOad HldgO 03aRSV~H AG 5NIlSI'I Og/VqOdaglNT 'aBL~Od :~]3NZgNg 68-N~r-60 :AgAa~S dO giro Z g~Vd 68-Nnr-LT ,:~/VO NOl/VlfldH~3 qCOd gN~nGsiq/Avg ]OHORad '3NI ~V~SV~V 03a¥ ARCO ALASKA~ ZNC. LISBURNE L5-36 PRUOHOE BAY/LISBURNE POOL NORTH SLOPE~ ALASKA COMPUTATIDN DATE: 1T-JUN-89 PAGE 3 DATE OF SURVEY: 09-JUN-89 KELLY BUSHING ELEVATION: 59.00 FT ENGINEER: PORTER INTERPOLATED LISTINS 8Y MEASURED DEPTH FROM KB CCONT'D) TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN OEG MIN ~KB @KB ~MSL 8000.00 6113.95 6054.95 46 3 8100.00 6182.82 6123.82 46 48 8200.00 6251.80 6192.80 '45 56 8300.00 6321.88 6262.88 45 3 8400.00 6392.79 6333.79 44 36 8500.00 6464.14 6405.14 44'26 8600.00 6535,42 6476.42 44 52 8700.00 6605.41 6546.41 46 33 8800..00 6672.88 6613.88 48 19 8900.00 6738.98 6679.98 48 49 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTUR~ SECTION SEVERITY NORTH/SOUTH EAST/~EST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN N 9 23 W 4544.79 N 10 22 W 4617.25 N 9 56 W 4689.59 N 9 20 W 4760.85 N 7 56 W 4831.23 N 6 29 W 4901.02 N 5 4 5 W 4970 N 9 23 W 5041.84 N 13 42 W 5115.63 N 14 26 W 5190.62 1.26 0.65 0.69 0.89 0.99 0.89 1.29 5.71 1 0.91 4425.91 N 1035.22 W 4545.37 N 13 9 W 4497.30 N 1047.90 W 4617.77 N 13 6 4568.55 N 1060.69 W 4690.07 N 13 4 W 4638.88 N 1072.66 W 4761.28 N 13 I W 4708.58 N '1083.33 W 4831.59 N .12 57 W 4778.09 N 1092.12 W 4901.31 N 12 52 4847.8'4 N 1099.46 W 4970.95 N 12 46 4918.70 ,N 1108.20 W 5042,,00 N 12 41 4990.85 N 1123.63 W 5115.78 N 12 41 W 5063.61 N 1141.96 W 5190.78 N 12 42 W 9000.00 6804.41 6745.41 49 29 9100.00 6868.86 6809.86 50 9 9200.00 6932.30 6873.30 51 2 9300.00 6994.89 6935.89 51 32 9400.00 7057.95 6998.95 50 28' 9500.00 7121.27 7062.27 51 1 9600.00 7183.95 7124.95 51 17 9700.00 7246.41 7187.41 51 27 9800.00 7308.45 7249.45 51 50 9900.00 7369.99 7310.99 52 4 10000.00 7431.36 7372..~6 52 15 10100.00 7492.19 7433.19 52 49 10200~00 7552.30 7493.30 53 12 10300.00 7611.87 7552.87 53 32 1.0400.00 7671.15 7612.15 53 43 10500.00 7730.75' 7671.75 53 10600.00 7791.09 7732.09 52 55 10700.00 7852.00 7793.00 51 38 10800.00 7915.46 7856.¢6 49 27 10900.00 7982.05 7923.05 47 5 N 14 37 W 5266.18 N 14 41 W 5342.58 N 14 54 W 5419.80 N 15 16 W 5497.69 N 13 32' W. 5575.23 N 13 I W 5652.62 N 13 3 W 5730.53 N 13 21 W 5808.62 N 13 36 W 5887.02 N 12 42 W 5965.83 11 56 W 6044.78, 11 59 W 6124.15 12 34 W 6204.07 12 31 W 6284.38 11. 29 W 6364.92 10 24 W 6445.20 10 18 W 6524.90 10 6 W 6604.15 9 17 W 6681.35 8 8 W 6755.80 1.54 1.89 0.62 0.53 1.35 0.69 0.44 0 0.32 1.75 0.23 0.58 0.38 0.70 0.74 1.41 0.62 1.72 3.56 2.84 5136.81 N 1160.98 W 5266.37 N 12 44 W 5210.78 N 1180.31 W 5342.79 N 12 45 W 5285.53 N 1200.01 ~ 5420.04 N 12 47 W 5360.82 N 1220.36 W 5497.97 N 12 49 ~ 5435.93 N 1239.89 W 5575.54 N 12 50 W 5511.28 N 1257.57 W 5652.94 N 12 51 W 5567.1,9 N 1275.10 W 5730.85 N 12 51 W 5663.24 N 1292.91 ~ 5808.95 N 12 51 ~ 5739o49 N 1311.23 H 5887.37 N 12 52 W 5816.18 N 1329.44 W 5966.19 N 12 52 W 5893.37 N 1346.05 W 6045.13 N 12 51 W 5971.01 N 1362.49 W 6124.49 N 12 51 W 6049.11 N 1379.¢8 W 6204.41 N 12 50 W 61'27.4.8 N 1397.05 ~ 6284.72 N 12 50 W 6206.26 N 1413.75 W 6365.25 N 12 49 W 6285.07 N 1429.16 W 6445.51 N 12 48 W 6363.54 N 1443.38 W 6525.18 N 12 ~6 6441.58 N 1457.4.4 W 6604.40 N 12 44 6517.74. N 1470.53 kl 6681.57 N 12 ~2 W 6591.4.7 N 1481.84 W 6755.98 N 12 40 W , 11000.00 8052.31 7993.31 43 23 11100.00 8126.08 8067.08 42 9 11200.00 8200.29 8141.29 41 58 .11300.00 8274.94 8215.94 41 23 11400.00 8350.30 8291.30 40 54 11500.00 8425.75 8366.75 41 22 11600.00 8500.49 8441.49 41 4*7 11700.00 8574.92 8515.92 41 56 11800.00 86~9.01 8590.01 42 41 11900.00 6721.04 8662.04 ~5 13 N 6 9 W 6826.65 N 5 39 W 6893.73 N 5 34 W 6960.31 N 5 30 W 7026.39 N 4 58 W 7091.64 N 4 31 W 7156.70 N 4 29 W 7222.54 N 3 31 W 7288.63 N 4 33 W 7355.17 N 4 43 W 7423.91 4.09 0.25 0.22 0.60 0.28 1.00 0.54 2.45 2.06 3.45 6662.03 N 1490.76 W 6826.79 N 12 36 W 6729.19 N 1497.60 W 6893.82 N 12 32 W 6795.90 N 1504.16 W 6960.37 N 12 28 W 6862.12 N 1510.57 W 7026.42 N 12 24 W 6927.58 N 1516.62 W 7091.65 N 12 ZO W 6992.99 N 1522.03 W 7156.70 N 12 16 W 7059.22 N 1527.24 ~ 7222.54 N 12 12 W 7125.84. N 1531.91 W 7288.66 N 12 7.W 7192.79 N 1537.15 W 7355.21 N 12 3 W 7261.92 N .1542.74 ~ 7423.98 N 11 59 W ARCO ALASKA9 INC. LISBURNE L5-36 PRUDHOE 8AY/LISBURNE POOL NORTH SLOPE ~ ALASKA COMPUTATION DATE: 17-JUN-89 PAGE 4 DATE OF SURVEY= 09-JUN-89 KELLY BUSHING ELEVATION= 59.00 FT ENGINEER: PORTER. INTERPOLATED LISTING BY MEASURED DEPTH FROM KB (CONTmD) TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVER[TY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG HIN FEET OEG/[O0 FEET FEET FEET DEG ~KB ~KB @MSL 12000°00 8789.50 $730.50 48 11 N 4 58 N 7496.18 2.73 7334.53 N 1548.93 N 7496°30 N 11 55 12100.00 8854.42 8795.42 SO 53 N 5 22 N 7571.67 3.33 7410.26 N 1555.90 N 7571.8~ N 11 51 12172.00 8899.35 8840.35 5J 29 N 5 23 N 7627.53 0.00 7¢66.28 N 1561o18 N ?627°75 N 11 ARCO ALASKA~ INC. LISBURNE L5-36 PRUDHOE BAY/LISBURNE POOL NORTH SLOPEr ALASKA COMPUTATION DATE: 17-JUN-89 PAGE 5 DATE OF SURVEY: 09-JUN-89 KELLY BUSHING ELEVATION: 59.00 FT ENGINEER: PORTER INTERPOLATED LISTING BY MEASURED DEPTH FROM KB C1000' INTERVALS) TRUE SUB-SE* COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN aKB ~K8 gMSL 0.00 0.00 -59.00 0 0 1000.00 999.97 940'97 I 7 2000.00 1955.09 1896.09 ~28 42 3000.00 2739.52 2680.52 47 41 4000.00 3379.14 3'320.t4 49 34 5000.00 4020.28 3961.28 49 45 6'0.00.00 4715.77 4656.77 46 20 7000.00 5419-80 5360.80 45 17 8000.00 6113.95 6054.95 46 3 9000.00 6804.41 6745.61 49 29 VERTICAL DOGLEG D~G MIN RECTANGULAR. COORDINATES HORIZ. DEPARTUR~ SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET DEG MIN 10000.00 7431.36 7372.36 52 15 11000.00 ~052.31 7993.31 43 23 12000.00 8789.50 8730.50 48 11 ,12172.00 8899.35 8840.35 51 29 N 0 0 E 0.00 N 23 5 E -2.03 N 8 42 W 258.84 N 15 34 W 866.20 N 15 57 W 1632.68 N 16 6 W 2397.98 N 11 38 W 3115.62 N 10 11 W 3825.66 N 9 23 W 4546.79 N 14 3'7 W 5266.18 N 11 56 W 6044.78 N 6 9 W 6826.65 N 4 58 W 7496.18 N 5 23 W 7627.53 0.00 2.05 1.73 1.91 0.45 4.77 1.75 0.25 1.26 1 0.00 N 0.00 E 0.00 N 0 0 E 1.03 S 4.80 E 4.91 S 77 53 E 256.17 N 40.08 W 259.29 N 8 53 W 847.07 N 181.02 W 866.20 N 12 3 W 15'84.87 N 395.41 W 1633.45 N. 16 0 W 2321.87 N 607.88 W 2400.12 N 14 40 3020.95 N 770.35 'W 3117.62 N 14 18 3716.80 N 911.91 W 3827.03 N 13 47 6425.91 N 1035,22 W 654,5.37 N 13 9 W 5136.81 N 1160'98 W 5266.37 N 12 44 W 0.23 5893.37 N 1346.05 W 6045.13 N 12 51 W 4.09 6662.03 N 1490.76 W 6826.79 N 12 36 W 2.73 7334.53 N 1568.93 W 7696.30 N 11 55 W 0.00 7466.28 N 1561.18 W 7627.75 N 11 48 W ARCO ALASKA, INC. LISBURNE L5-36 PRUDHOE BAY/LISBURNE POOL NORTH SLOPE, ALASKA COMPUTATION DATE: 17-JUN-89 PAGE 6 DATE OF SURVEY: 09-JUN-89 KELLY BUSHING ELEVATION: 59.00 FT ENGINEER: PORTER INTERPOLATED LISTING BY TRUE VERTICAL DEPTH FROM MEAN SEA LEVEL TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH OEPTH DEG HIN DEG aKB aK'B gMSL 0.00 0.00 -59.00 59.00 59.00 0.00 159'00 159.00 100.00 259.00 259.00 ZO0.O0 3.59.00 359.00 300.00 4'59.00 459.00 400.00 559.00 559.00 500.00 659.01 659.00 600.00 759.02 759.00 700.00 859.02 859.00 800.00 0 0 N 0 0 E' 0 15 S 66 17 W 0 9 N 59 9 W 0 3 N 29 15 E 0 18 S 45 56 E 0 15 S 89 46 E 0 27 S 34 41 E 0 41 S 63 9 E 038 S 77 16 E 027 S 72 55 E 959.03 959.00 900.00 0 46 1059.06 1059.00 1000.0.0 2 18 1159.36 1159.00 1100.00 6 6 1260.25 1259.00 1200.00 9 8 1362.03 1359.00 1300.00 12 4 1464.72 1459.00 1400.00 14 20 1568.60 1559.00 1500.00 16 54 1673.88 1659.00 1600.00 19 52 1781.54 1759.00 1700.00 23 19 1891,,70 1859.00 1800.00 26 7 2004.46 1959.00 1900.00 28 46 2120.04 2059.00 2000.00 31 19 2236.83 2159.00 2100.00 30 41 2353.23 2259.00 2200.00 31 9 2472.36 2359.00 2300.00 35 0 2598.68 2459.00 2400.00 40 19 2735.99 2559.00 2500.00 46 8 2882.14 2659..00 2600. O0 46 33 3028.87 2759.00 2700.00 47 28 3178.59 2859.00 2aO0.O0 50 22 3337.87 2959.00 2900.00 51 2 3496.51 3059.00 3000.00 51 2 3655.61 3159.'00 3100.00 50 49 3813.17 3259.00 3200.00 50 24, 3968.91 3359.00 3300.00 4,9 4,0 4122.57 3459.00 34,00. O0 49 1 4274.81 3559.00 3500.00 4,8 58 4427.71 3659.00 3600. O0 4,9 26 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG N 50 17 E N 10 10 E N 0 50 W N 7 10 W N 12 55 W N 12 39 W N 11 11 W N 10 15 W N 11 1B'W N 10 3 W 0.00 0.00 0.00 N 0.00 E -0.01 0.88 0.02 S 0.04, W 0.13' 0.00 0.06 N 0.33 W 0.26 0.05 0'.16 N 0.47 W 0.16 0.49 0.14, N 0.11 W -0.23 0.48 0.20 S 0.14 E -0.65 0.00 0.52 $ 0.70 E -1.26 0.53 0.96 S 1.50 E -2.08 0.69 1.60 S 2.4,7 E -2.65 0.96 1.94, S 3.55 E -2.44, 0.88 1.54, S -0.52 2.94, 0.61 N 6.72 1.52 8.08 N 19.83 3.37 21.29 N 38.72 2.80 39.88 N 62.04, 2.74, 62.59 N 90.14 1.96 90.09 N 123.01 3.92 122.41 N 162.82 2.81 161.54 N 208.98 2.46 206.88 N N 8 41 W 260.98 N 10 59 W 318.86 N 11 4, W 379.17 N 10 54, W 4,38.74 N 10 15 W 503.4,1 N 12 17 W 580.4,7 N 17 21 W 674,.33 hi 17 32 W 780.41 N 14 59 W 887.48 N 15 11 W 998.77 N 15 58 W 1122.51 N 17 17 W 1245.37 N 17 9 W 1368.61 N 16 38 W 1489.96 N 16 4, W 1609.05 N 15 34, W 1725.49 N 14, 55 W 1840.14 N 14, 52 W 1955.67 4582.74 3759.00 3700.00 50 14, N 14 49 W 2074,.02 4'741.68 3859.00 3800.00 51 15' N 18 8 W 2197.15 0.00 N 0 0 E 0.05 S 62 39 W 0.33 N 79 57 W 0.50 N 70 45 W 0.18 N 38 4,2 W 0.25 S 34 15 0.87 S 53 32 1.78 S 57 17 E 2.94, S 57 10 E 4,.05 S 61 24, E 4.4,2 E 4.68 S 70 4,5 E 5.26 E 5.29 N 83 23 E 5.53.E 9.79 N 34 22 E 4.61 E' 21.79 N 12 12 E 1.17 E 39.89 N I 4,0 E 4.12 W 62.73 N 3 4,5 W 9.91 W 90.63 N 6 16 W 15.93 W 123.45 N 7 24 W 23.41 W 163.22 N 8 14, W 32.06 W 209.35 N 8 48 W 1.70 1.15 0.4,2 1.87 3.89 4.87 3.81 1.20 2.28 3.58 258.28 N 4,0.40 W 261.42 N 8 53 W 315.40 N 50.18 W 319.36 N 9 2 W 374.59 N 61.79 W 379.65 N 9 21 W 433.08 N 73.12 W 439.21 N 9 34 W 496.65 N 85.15 W 503.90 N 9 4,3 W 572.40 N 99.46 W 580.98 N 9 51 W 663.19 N 123.67 W 674.62 N 10 33 W 764.66 N 156.27 W 780.4,7 N 11 33 W 867.64, N 186.64 W 887.4,8 N 12 8 W 975.43 N 214.69 W 998.77 N 12 24 W 0.39 1.30 0.71 0.30 0.38 0.75 0.33 0.52 0 0.38 1094.70 N 24,8.52 W 1122.56 N 12 ~.7 W 1212.97 N 282.87 W 124,5.51 N 13 7 W 1331.05 N 319.85 W 1368.94, N 13 30 W 144,7.56 N 355.20 W 1490.50 N 13 4,7 W 1562.10 N 388.88 W 1609.78 N 13 58 W 1674.35 N 420.70 W 1726.40 N 14, 6 W 1785.16 N 450.67 W 1841.17 N 14, 10 W 1896.94 N 480.39 W 1956.82 N 14 12 W 2011.66 N 510.73 W 2075.28 N 14 14 W 2129.72 N 546.31 W 2198.68 N 14, 23 W ARCO ALASKAp INC. LISBURNE L5-36 PRUDHOE BAY/LISBURNE POOL · NORTH S.LOPE, ALASKA COMPUTATION DATE: 17-JUN-a9 PAGE 7 OATE OF SURVEY: 09-JUN-89 KELLY BUSHING ELEVATION: 59.00 FT ENGINEER: PORTER INTERPOLATED LISTING BY TRUE VERTICAL DEPTH FROM MEAN SEA LEVEL (CONTeD) T~UE SU~-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED.VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/biEST DIST. AZIMUTH DEPTH D~'PTH DEPTH DEG MIN DEG HIN FEET DEG/IO0 FEET FEET FEET DEG MIN @KB @KB @MSL 4902024, 3959.00 3900.00 51 48 5058.40 ¢059.00 4000.00 47 5 5199.84, 4159.00 4100.00 43 51 5338.54, 4259.00 4200.00 44 16 5479010 4359.00 4300.00 45 9 5622.69 4459.00 4400.00 46 54 5769059 4559.00 4500.00 47 2 5916.83 4659.00 4600.00 47 23 6062.35 4759.00 4700.00 46 4 6206.05 4859.00 4800.00 45 27 6348.09 4959000 4900.00 45 4 6489.77 5059.00 5000.00 45 0 6631.05 5159.00 510.0.00 44 52 6772.19 5259.00 5200.00 44 51 6913066 5359000 5300.00 45 10 7055.83 5459°00 5400.00 45 32 7199063 5559.00 5500.00 46 10 7344.15 5659.00 560'0000 46 25 7489002 5759.00 5700.00 46 19 7633.42 5859.00 5800.00 45 59 7777002 5959.00 5900.00 45 47 7921.11 ' 6059.00 6000000 45 58 8065025 6159000 6100.00 46 38 8210034 6259.00 6200.00 45 52 8352044 6359.00 6300.00 44 50 8492081 645g.00 6400.00 44 27 8633039 6559000 6500000 45 16 8779019 6659 o00 6600.00 4,8 5 8930.46 6759000 6700.00 49 1 9084064, 6859000 6200.00 50 1 9262053 6959.00 6900.00 51 11 9401.65 7059.00 7000.00 50 29 9560.13 7159.00 7100.00 51 13 9720.23 7259.00 7200.00 51 31 9882012 7359000 7300000 52 6 10045.26 7459.00 7400.00 52 29 10211019 7559.00 7500.00 53 14 10379.46 7659.00 7500.00 53 45 10546085 7759.00 7700000 52 50 10711020 7859.00 7~00.00 51 25 N 1~ 5 14 2322.10 N 16 3 W 2441.58 N 15 26 ~ 2541.,39 N 14 7 W 2637.41 N 12 29 ~ 2736,16 N 11 12 bi 2839019 N 11 20 ~ 2946.'78 N 11 34 ~ 3054.84 N 11 35 ~ 3160055 N 11 59 ~ 3263.74 N t! 10" 3664.35 '40 , 6 , N 10 4 ~ 4384.64 N 9 4 14 4488.27 N 10 22 14 4591.95 N 9 52 14 4697.01 N 8 41 14 4797083 N 6 35 14 4896.01 N 6 11 14 4994.23 N 13 20 14 5100.12 N 14 32 bi 5213.57 N 14 39 bi 5330.81 N 15 6 14 5452.86 N 13 31 14 5576.51 N 12 59 14 5699.44 N 13 26 14 5824.45 N 13 5 ~ 5951.72 N 11 56 g 6080.62 N 12 37 g 6213.03 N 11 37 14 6348.35 N 10 12 ~ 6482055 N 10 2 14 6612.89 0.70 3'.89 0.91 1.62 1.64 1.36 0.46 0.66 0.92 0.51 0.46 0.19 0.46 0.67 0.25 0.68 0.34 0.58 1.30 0.99 0.54 1.38 0.85 O.T9 1.23 0.88 2.20 1.93 0.89 1043 0 1.28 0.29 0.43 1.59 0.95 0.35 O.T1 0.24 lo96 Z249.10 N 585.40 ~ 2324.04 N 14 35 ~ 2363.87 N 619.95 ~1 2443.81 N 14 41 N 2460.08 N 647.19 ~ 2543.79 N 14 44 14 2553.02 N 671.70 ~ 2639.91 N 14 44 ~ 2649.11 N 694.54 ~ Z738.64 N 14 41 ~i 2749.95 N 715.69 id 2841.56 N 14 35 Z855.52 N 736.52 ~/ 2948.98 N 14 27 2961.42 N 758.11 bi 3056.92 N 14 21 3064.96 N 779.40 id 3162.51 N 14 16 bi 3166.01 N 800.35 ~d 3265-61 N 14 11 ~ 3264.65 N 821.44' bi 3366.4.1 N 1~ 7 W 3362.85 N 842.22 W 3466.71 N 14 3 W 3460.58 N 862.44 bi 3566.42 N 13 59 bi 3558.21 N 8:~2.09 bi 3665.91 N 13 55 g 3656.50 N 900.90 ~ 3765.85 N 13 50 ~i 3755.94 N 918.90 bi 3866.71 N 13 44 bi 3857.88 N 935.85 ~ 3969.76 N 13 38 bi 3960.93 N 952.18 ~ 4073.77 N 13 31 bi 4064.18 N 970015 14 4178.37 N 13 25 bi '4166.36 N 990.43 g 4282.46 N 13 22 g 426T.T3 N 1008.98 14 4385038 N 13 18 bi 4370o02' N 1026.22 id 4488°90 N 13 12 bi 4472.41 N 1043.34 bi 4592.50 N 13 7 bi 4575.87 N 1061097 14 4697.49 N 13 3 bi 4675.46 N 1078.47 14 4798.23 N 12 59 bi 4773009 N 1091.5.5 bi 4896.31 N 1Z 52 ~1 4871.35 N 1101.91 14 4994.42 N 12 44 ,975.77 N 1120.02 bi 5100027 N 12 41 5085.85 N 1147.71 id 5213.74 N 12 43 bi 5199.39 N 1177.33 bi 5331.02 N 1Z 45 ~ 5317.50 N 1208.58 i~ 5453.12 N 12 48 bi 543T.17 N 1240.19 bi 5576.81 N 12 50 N 5556.90 N 1268.10 bi 5699.76 N 12 51 bi 5678.64 N 1296.58 bi 5824.78 N 12 51 bi 5802.43 N 1326030 ~l 5952008 N 12 52 bi 5928043 N 1353047 bi 6080096 N 12 51 bi 6057085 N 1381.43 ~ 6213037 N 12 50 bi 6190003 N 1410043 id 6348069 N 12 50 ~ 6321.84 N 1435.83 bi 6482.85 N 12 47 bi 6450.20 N 1458096 bi 6613.14 N 1g 44 bi ARCO ALASKA, INc. LISBURNE L5-36 PRUDHOE BAY/LISBURNE POOL NORTH SLOPEr ALASKA COMPUTATION DATE: 17-JUN-89 PAGE 8 DATE OF SURVEY: 09-JUN-89 KELLY BUSHING ELEVATION: 59.00 FT ENGINEER: PORTER , INTERPOLATED LISTYNG BY TRUE VERTICAL DEPTH FROM MEAN SEA LEVEL CCONT'D) TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERT]CAL OEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/14EST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN @KB -~K8 aMSL 10865.88 7959.00 7900.00 47 55 11009.18 8059.00 8OO0.O0 43 3 11146.41 8159.00 8100.00 42 7 11278.73 8259.00 8200. O0 41 31 11'411.51 8359.00 8300.00 40 52 11564.38 8459.00 8600.00 41 37 11678.58 8559.00 8500.00 62 3 11813.63 8659.00 8600.00 42 58 11954.78 8759.00 8'700.00 46 57 '12107.. 28 8859.00 8800.00 51 6 12172. O0 8899.35 8840.35 51 29 DEG MIN FEET N 8 33 14 6730.71 N 6 I 14 6832.91 N 5 37 14 6923.34 N 5 30 W 7012.41 N 4 55 W 7099.11 N 4 30 W 7185.84 N 3 36 W 7274.46 N 4 31 W 7364.35 N 4 54 W 7663.07 N 5 2?. 14 7577.28 N 5 23 W 7627.53 DEG/IO0 FEET FEET FEET DEG HIN 2.35 3.37 0.53 0.58 0.21 1.00 2.18 2.59 2.81 2.60 0.00 6566.58 N 1678.19 W 67.30.90 N 12 41 W 6668.29 N 1491.43 W 6833.04 N 12 36 W 6758.85 N 1500.53 W 6923.41 N 12 31 W 6868.11 N 1509.22 W 7012.45 N 12 25 6935.08 N 1517.27 W 7099.12 N 12 ZO W 7022.29 N 1526.34 W 7185.86 N 12. 14 7111.56 N 1531.02 W 7274.47 N 12 8 7202.03 N 1537.88 W 7364.39 N 12 3 W 7301.27 N 1546.05 W 7663.17 N 11 57 W 7415.89 N 1556.6.3 W 7577.46 N 11 51 W 7466.28 N 1561.18 W 7627.75 N 11 68 W ARco ALASKAt INC. LISBURNE L5-36 PRUOHOE BAY/LISBURNE POOL NORTH SLOPEr ALASKA ~ARKER TOP WAHOO ZONE TOP WAHOO ZONE TOP WAHOO ZONE TOP WAHOO ZONE GCT LAST READING PSTD TD COMPUTATION DATE: 17-JUN-89 PAGE g DATE OF SURVEY: 09-JUN-89 KELLY BUSHING ELEVATION: 59.00 FT ENGINEER: PORTER INTERPOLATED LISTING BY CHOSEN HORIZONS SURFACE LOCATION = 2387e FSL & 37e FWLt SEClt TllN~ RISE MEASURED DEPTH BELON KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/~EST 11690.00 8567.48 8508.48 11743.00 8606.92 8547.92 11854.00 8688.29 8629.29 12116°00 8864.47 ~80S.47 12120.10 8867.03 8808.03 12161.00 8892.50 8833.50 12172.00 8899.35 8840.35 7119.17 N 7154.49 N 7229.72 N 7'~21.66 N 7425.85 N 7~57°71 N 7466.28 N 1531.4~9 W 1533.96 W 1540.09 155 7.07 I,I 1557.37 W 1560.37 W 1561.18 W ARCO ALASKAt INC. LISBURNE L5-36 PRUDHOE BAY/LISBURNE POOL NORTH SLOPE~ ALASKA COMPUTATION DATE: 17-JUN'~89 PAGE 10 DATE OF SURVEY: 09-JUN-89 KELLY BUSHING ELEVATION: 59.00 FT ENGINEER: PORTER MARKER TOP WAHOO ZONE 6 TOP WAHOO ZONE 5 TOP WAHOO ZONE 4 TOP WAHOO ZONE 3 PBTD TD STRATIGRAPHIC SUMMARY ************ SURFACE LOCATIQN -- 2387' FSL & 37m FWL~ SECl~ TllN~ R15E MEASURED OEPTH TVD BELOW KB FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 11690.00 8567.48 8508.48 7119.17 N 11743.00 8606.92 8547.92 715~.49 N 11854.00 8688.29 8629.29 7Z29.72 N 12116.00 8864.47 8805.47 7422.66 N 12161.00 889Zo50 8833.50 7457-71 N 12172.00 8899.3S 8840.35 7466.28 N 1531.49 W 1533.96 W 1540.09 W 1557.07 W 1560.37 k 1561.18 W FINAL WELL LOCATION AT TO: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 1217Z.O0 .8899.35 8840.35 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 7627.75 N 11 48 W SCHLUMBERGER O I REC T I ONAL SUR ¥ E Y COMPANY ARCO ALASKA, INC. WELL L I SBURNE LS-36 FIELO PRUOHOE 8AY/LISSURNE COUNTRY USA RUN ONE DATE LOOOEO 09 - dUN - 89 REFERENCE 93369. POOL 'WE[L? -.LISBURNE {23'87.' FSL, 37' FWL , C' 1, TliN, R15E) HORIZONTAL PROJECTION SCALE: = 1/2000 IN/FT 10000 4000 -2OOO -4OO0 -2OO0 0 2OOO 40OO .liiOO0 WELL':. LISBURNE L5-36 (2387' F,~L, 37 FWL, SE TllN, R15E) VERTICAL PROJECTION -4000 -2000 0 0 2000 4000 GO00 PROJECTION ON VERTICRL PLRNE ;)48. - 168. SCRLED IN VERTICAL 8000 10000 12000 ;)48. HORIZ SCALE = 1/2000 IN/FT Ill II OIL AND GAS CONSERVATION COMMISSION REPORT OFSU.NDI WELL OPE TION$ 1. Operations performed: Operation shutdown __ Stimulate __ Plugging __ Perforate __ Pull tubing __ Alter casing __ Repair well __ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of Well at surface 2387' FSL, 37' FWL, Sec. 1, T11N, R15E, UN At top of productive interval 1054' FNL, 1494' FEL, 5ec.35, T12N, R15E, UM At effective depth 715' FNL, 1523' FEL, 5ec.35, 'T12N, R15E, UN At total depth 707' FNL, 1524' FEL, $ec.35, T12N~ R15E, UN 12. Present. well condition sUmmary Total depth: measured true vertical Effec.tive depth: measured true vertical 12172'MD 8899'TVD 12161'MD 8893'TVD 5. Type of Well: Development Exploratory Stratigraphic Service Other ,"' 6. Datum elevati'on (DF ~)r KB) RKB 56' Casing Length Size Structural Conductor Surface 80 ' 20" 4914 ' 10-3/M' Intermediate Production 11615 ' 7-5/8" Liner 756 ' 5-1/2" Perforation depth: measured None true vertical None Compl e~'~4 / 7. Unit or Property name Prudhoe B~y Vnit/Lisburne 8. Well number L5-36 9. Permit number/approval number 89-36/9-552 Tubing (size. grade, and measured depth) 10. APl number 50-- 029-21~33 11. Field/Pool Li sburne 0il Pool feet feet Plugs(measUred)Plug.~ 4973' (KOP)-8607' w/1157 sx Class G feet' EZSV @ 12161' plug ~ 9000' w/500 sx Class G None feet Junk (measured) feet Cemented Measured depth True vertical depth 2150# Pol eset 110 'MD 110 ' TVD 1650 sx AS III & 4953'MD 3991'TVD 350 sx Class G - Top job w/118 sx AS I 507 sx Class G 11650'MD 8538'TVD 165 S$ II 11416'-12172'MD 8368'-8899'TVD sqz liner ]ap w/lO0 sx RFC & 100 sx Class G 2-7/8", L-80, tbg w/tail ~ 11636' Packers and SSSV (type and measured depth) csg packer @ 11835', Baker 'DB' pkr ~ 11375' (WLH), CAMCO 'TRDP:'-IA-SSA' S$SV ~ 1~2~I.~ ~'~,' ~'~'1 r- External 13. Stimulation or cement squeeZe summary ' ~' ~'' ~ I~ V C 14. Service Intervals treated (measured) 11510'-11518' (original hole); 11550'-11750' (sqz due to lost circ) Treatment description including volumes used and final pressure Representative Daily Average Production or Injection Data N/A OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation Subsequent to operation 15. Attachments 116. Status of Well classification as: Copies of Logs and Surveys run ,," i Daily Report of Well Operations ..~, Oil ~ Gas __ Suspended 17. I hereby certify that the foregoing is true and correct tothe best of my knowledge. Tubing Pressure Signed ~~t~ Title Drillinq Aridly§l; Form 10-404 Rev 06/1,~8~ * Completion We1-1 History (DAN) SW04/045 ~issJon Date '7-1 SUBMIT IN DUPLICATE ARCO Oil and Gas Company Well Hi.tory- Initial Report - Dally Instructions: Prepare and submit the "Initial ReimS' on the first Wednesday after a well Is spudded or workover operations ere Iterted. Daily work pdor to spudding should be summarized on the form giving inclusive date8 only. District ICounty, parish or borough I Field .............. ILease or'~L~l~ ........ Auth. or W,O, ITItla ...... I Stat~w T..!-3=. ~Va. no. Operator Spudd,d or ~%'P, oun? Date and dep'fl~-~-?? Complete record for each day re~ed as of 8:~ a,m. 0?/02/89 ( 6' TD:12172 PB:12166 SUPV: RJB/JER RUNNING 2-7/8# COMP 5-1/2"e12172' MW: 9.4 NACL MIRU AUDI 4. ACCEPT RIG e 0800 HRS, 7/1/89. ND TR~E. NU BOPS. TEST SAME. RU W-LINE. W/ 6.'75 JB/GR. TAGGED ICE AT 300'. PU 3-1/2 DP AND HASH TO 816'. RIH #/ JB/GR TO 11423'. STUCK AT 6470 WHIL~ POOH. PULL FREE. MU BAKER 7-5/8' DB PKlt. RIN ON H-LINE TO 11375. R/D W-LINE. MU LOCATOR/SEALASSY & RIH W/ 2-7/8# COMPLETION. DAILY:S90,900 CUM~$5,997,105 ETD:S5,997,105 RECEiVBD JUL 2 t ]989 Oil & Gas Cons. Commlssffon Anchorage The above la correct Signatu r~.,:~ ~..~~ ~'f or orm prepl~ratlon and distribution, aec Procedures Manual, ~ectlon 10, Drilling, Pages 86 and 87. I~it'' L)riliing ~ AR3B-459-1-D INumber all dally wall history forms conleoutlvely es they em prepared for each well. iPage no. ARCO (~1 and Gas Company Dally Well History-Final Report Instructions: Prepare and submit the "Final Rapo~t" on the first Wednesday after allowable has been assigned or well le Plugged Abandoned, or 80 d. "Final Report" should be submitted also when operations are suspended for an Indefinite or appreciable length of time. On workoverl when an official test le not required upon completion, report completion and representative test data in blocks provided. The "Final Rel~ell" form may be used for reporting the entire operation if space is available. I Account!ng coat center oode District IC0unty or Parl.h IStats Field T.T ctPrlD~. Auth. or W.O. n~.- ~T=q8aq ILease or Unit '--' [ Well no. Title j~T,_' Operator Spudded or W.O. begun Date and depth as of 8:00 a.m. Old TD Released rig APT: ~(t-t'lgq-'21 IA'R'c°' w'-I' ........ leo,tiT°tel number of wells (active or Inactive) on thiS]center prior to plugging and 40_ O_nOn_ labandonment of this well IDate IH°ur IPrIor 't'tu' 'f . w.O. n'~/n~_/_~a Complete record for each day reported _ __- _ Classifications (oil, gas, etc.) Producing method 07/03/89 TD:12172 PB:12166 SUPV:RJB/JE~ RELEASED RIG ~ 0200 5-1/2"~12172' MW: 8.5 FSWL RIH W/ 2-7/8" COMPLETION. SPACE OOT. TEST CNTL LINES. DISP WELL TO 8.5 SW. FREEZE PEOT TO 2000'. LAND T~. SOS W/ 2000 PSI. TEST TBG TO 3500 PSI F/ 30 MIN. TEST CSG TO 3500 F/ 30 MIN. ND BOP. NU TR~E. TEST SAME. SET EPV. SECURE WELL. RDMO. RELEASE RIG e 0200 HRS 7/3/89. (CAMCO 'TRDP-1A-SSA' SSSV % 1923', BAKER 'DB' PKR ~ 11375'(WLM) & TT @ 11636'.) DAILY:S169,800 CUM:$6,166,905 ETD:S6,166,905 New TD Date IPB Depth Kind of rig IType completion (single, dual, etc.) Official reservoir name(s) Potential test data Well no. Date Reservoir Producing interval OII or gelTelt time Production O on reit .....(~ee per day Pump size. SPM X length Choke size T.P. C.P. Water % GeE Gravity Allowable Effective date corrected , , The above is correct For form preparation and distribution, see Procedures Manual; Section 10, Drilling, Pages86 and 87. AR3B-459-3-C INumber all dally well hletol./ forms consecutively as they are prepared for each well. j Page no. DlvlliOn of AtlantloRIohflMdCompany ARCO ALASKA INC. LISBURNE ENGINEERING DATE: 7-18-89 FROM: TINA KINCAID ENCLOSED IS THE FOLLOWING DATA FOR LISBURNE: .,FINAL FoR'L2-16 :~ INJECTION TEMP PROFILE RUN 1 5-27-89 CAMCO FINAL FOR L2-24 INJECTIbN TEMP PROFILE FINAL FOR L2:32 INJECTION TEMP PROFILE FINAL FOR L3-28 PHYSICAL FORMATION RUN 1 5-26-89 CAMCO RUN 1 5-27-89 CAMCO RUN 1 7-5-89 SCH FINAL FOR L4-3 COLLAR LOG RUN 1 6-10-89 DA FINAL FOR L5-1 COLLAR LOG PFC RUN 1 6-30-89 DA RUN 1 7-5-89 DA FINAL FOR L5-33 PRODUCTION PACKER. COLLAR LOG GAMMA RAY RESISTIVITY PHYSICAL FORMATION LOG PRODUCTION PACKER RUN 1 7-3-89 DA RUN 1 7-3-89 DA RUN1 6-11-89 SCH RUN 1 6-23-89 SCH RUN 1 7-1-89 DA 7 SIGN AND RETURN TO: RECEIVED BY: EXXON STANDARD TINA KINGAID ARCO ALASKA, INC. 700 G STREET; ATO 409 ANCHOR. AGE, ALASKA 9951 :JUt TRANSMITTAL # 618 ' ARCO ALASKA LISBURNE ENGINEERING DATE: 6-3t'-89 FROM: TINA KINCAID ENCLOSED IS THE FOLLOWING DATA FOR LISBURNE: CASED HOLE LOGS FINAL FOR L1-28 ~COLLAR LOG ~ COLLAR LOG FINAL FOR L5-21 ~ COLLAR LOG FINAL FOR L5-25 ~'--PROD PROFILE ~ SPECTRALOG ~".-NEUTRON GAMMA RAY ,.,GAMMA RAY ACOUSTIC CEMENT BOND LOG .. RUN I 6/2/89 RUN I 6/14/89 RUN I 5/26/89 DRESSER ATLAS DRESSER ATLAS DRESSER ATLAS RUN I 6/1/89 CAMCO RUN '1 5/26/89 RUN I 5/26/89 RUN I 6/2/89 RUN I 6/1/89 DRESSER ATLAS DRESSER ATLAS DRESSER ATLAS DRESSER ATLAS OPEN HOLE LOGS FINAL FOR L5-33 ~ DUAL LATEROLOG ~'~ NATURAL GAMMA 'RAY SPECTRA LOG ~CNL - POROSITY ~'~,JCNL - RAW DATA RUN I 6/18/89 RUN I 6/18/89 RUN I 6/18/89 RUN I 6/18/89 SCHLUMBERGER SCHLUMBERGER SCHLUMBERGER SCHLUMBERGER ED Alaska 0ii & Gas Cons. (.;ommission Anchorage ~ STATE OF ALASKA ~ A L~$KA OIL AN D G^$ CONSERVATION COM M I~'~ I ON APPLICATION FOR SUNDRY APPROVALS , 1. Type of Request: Abandon __ Suspend __ Alter casing __ Repair well Change approved program __ 2. Name of Operator ARCO Alaska, Inc. 3. Address P,O, Box 1003,60 Anchor`age, AK 99510-03,60 4. Location of well at surface Operation shutdown ~ Re-enter suspended well __ Plugging __ Time extension __ Stimulate __ Puli tubing __ Variance __ Perforate __ Other 5. Type of Well: Development Exploratory Stratigraphic Service 2387' FSL, 37' FWL, Sec. 1, TllN, R15E, UM At top of productive interval 800' FNL, 1560' FEL, Sec.35, T12N, R15E, LIN (approx) At effective depth 669' FNL, 1370' FEL, Sec.3,5, T12N, R15E, UN (approx) At total depth 661' FNL, 1370' FEL, Sec.35, T12N, R15E, UN (approx) 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12172' ND feet 8887 ' TVD feet 12161 ' ND 8879 ' TVD feet feet Casing Length Size Structural 80 ' 20" Conductor /+91/+ ' 10-3//+" Surface Intermediate 11615 ' 7-5/8" Production 756' 5-1/2" Liner Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) None Packers and SSSV (type and measuJ:ed, depth) ~.xt;erna~ csg packer` L~ 1183,5' Plugs (measured) Junk (measured) 13. Attachments Description summary of proposal __ W~I I 1-14 14. E~t~rnatecJ ~1~t~-(~ for commencing operation Sepl;ember 1989 6. Datum elevation (DF or KB) RKB 56' 7. Unit or Property name Pr,udhoe Bay Unit;/Lisburne Date approved 8. Well number L5-36 9. Permit number 89-36 10. APl number 50--029-21933 11. Field/Pool Lisbur,ne 0'11 Pool 16. If proposal was verbally approved Name of approver Plug ~/+973'-1157 sx Class G EZSV ~ 12161 ' None Cemented Measured depth True vertical depth feet SUBMIT IN TRIPLICATE Service Form 10-403 Rev 06/15/88 17. i hereby certify, thaJ, the-fpregping is true and correct to the best of my knowledge. Signed /. ~, ~~~~.~~' Title D~,..~,.,,, ~ ~ n.,~ ~ ~ ,.-ng FOR COMMI$SIONUSE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- ORIGINAL SIGNED BY LONNIE C. SMiTH Approved by order of the°~o~Al~on Commissioner Oil ~'' Gas __ Date RECEIVED JUN 2 ]989 Naaka 011 & Gas Cons. Commission Anohorage Detailed operations program __ BOP sketch __ 15. Status of well classification as: Suspended__ JApproval No. ~..~.~~, Approved Copy 2150 #Poleset; 110*ND 110'TVD 1650 sx AS I II & /+953't4D 3991'TVD 350 sx Class G - Top .job w/118 sx AS I 507 sx Class G 11650'MD 8527'TVD 165 $5 II 11/+16'-12172'MD ' 8352 ~-8887 See liner' lap w/lO0 sx RFC & 100 sx Class G ARCO Oil andGas Company O' Well History - Initial Report - Dally Inetruotiona: Prepare end submit the "!~#hd II~~ on-the-first Wednesday tffol I well Is spudded or workover Ol~retiona ,re etartld. Daily w~rk prior to ePudd, .~.~.....?~:b~ ~um~Idzed on the form giving Inclusive dMea only. Field ~-~.G ;,~., ,..... ILS--. o ~' ;~';~' ~ Will no. I Title I Operator Spudded or ~l~..'~'b~g .... IDet. Date end dep~l~ v~ Complete record for each day reported as of 8:00 a.m. b,v &v&, -.~ 03/25/89 ( TO: 0'( SUPV:IIMP 03/26/89 ( TO: 0'( SUPV:HMP 03/2?/89 ( TO: 0'( SUPV:HMP 03/28/89 ( TO: 0'( SUPV:HMP 03/29/89 ( TO: 931' ( SUPV: ~.v]P 03/30/89( TI): 2117'( 1 SUPV: DBJ/~R 04/0~/89 ( ~: 4980' ( SUPV: DB~/~R 04/02/89 ( ?D: 4980' ( SU~V: DB~/~R IHour .. _ .. ARCO W.I. ) PREPARING TO MOVE MI~: 0.0 VIS: 0) RIGGING DO~N, PREPARING TO MOVE TO L5-36 ) O) .) . O) ) O) 31) ) 86) 00) 63) DAILY:S50,000 CUM:S50,000 PREPARING TO MOVE RD, PREP TO MOVE RIG TO L5-36. DAILY:$50,000 CUM:S100,000 ETD:SS0,000 EFC:$2,723,000 MW: 0.0 VIS: MOVE SUB, LD DERRICK. ETD:S100,000 MW: 0.0 ViS: MOVE RIG, RU RIG. 50% RIGGED UP. DAILY:S76,900 CUM:$176,900 gTD:$17$,900 gFC:$2,723,000 RIGGING UP MW: 0.0 VIS: SPOT PIT COMPLEX, CONTINUE RIGGING UP. EST. 90% RU, FILLING PITS N/WATER. DAILY:S30,'900 CUM:$207,800 STD:$207,800 EFC:$2,723,000 DRILLING MW: 8.9 VI8:250 FX~ RU'FLOOR. NO DXVERTER, TEST SAME. MiX SPUD MUD. SPUD'S~130 HRS, 3/28/89. DRLD F/110'-931'. DAIL~,O60 CUM:$277,860 PREP TO POOH- DRLD TO 99~'. CBU, TFNB NO. 2. TO POOH. DAILY:S43,170 COH:$321,030 DRILLING ETD:S277,860 EFC:$2,723,000 MW: 9.4 VIS:250 DRLD TO 2117'. CSU, PREP ETD:S321,030 EFC:$2,723,000 MW: 9.6 VIS:200 POOH, LD BENT SUB AND MOTOR, PU STEERABLE MOTOR. RIH, DRLD TO 3617'. DAILY:S59,276 CUM:$380,306 ETD:$380,306 EFC:$2,723,000 POOH TO RUN CASING MW: 9.8 VIS:Il0 DRLD TO 4150', TFNB NO. 4. DRLD TO 4980', CBU. POOH TO RUN 10-3/4# CSG~ DAILY:S62,509 CUM:$442,815 ETD:S442,815 ~FC:$2,723,000 NU BOPS 10-3/4"~ 4953' MW: 9.9 VIS: 65 FIN POOH, RU CSG CREW. RUN 127 JTS. 10-3/4" 45.5% J-55 BTC CSG TO 4953'. RU DOWELL, MIX AND PUMP 1GS0'..SX ASZII FOLLOWED BY 350 SX CLASS #G'. CIP AT 1945 }IRS 4/1/89. ND DIVERTER, PERFORM TOP JOB. INSTALL WELLHEAD, NU BOPS. DAILY:S296,833 CUM:$739,648 ETD:S739,648 EFC:$2,723,000 For form I~reparatlon and distribution, see Procedures Manual, ~ectlon 10, Drilling. Pages 86 and 87. AR3B-459-1-D I Number III dilly will hlstmy formi oonleouflvely they m'e prepared for eloh well. iPege no. ARCO Oil and Gas Company ',~," Dally Well History--Interim Instructions: This form is used during drilllhg or workover operations. If testing, corln.g,.or_pe~or.atlng.~ s.h.ow formation name. In d.e. lo~ib.l~ w. ork performed. Number all drill stem tests sequentially. Attach description of all cores. Work perle.trane Dy I.'ro~.u01ng Beetle?. W. lll be reppfleo on "lltllrlm snoots until final completion. Report official or representative test on "Final" form. 1) Submit "lntnrlnt" sheets when ~led out out not lell fraqusntly than avery 30 days, or (2) on Wednesday o! the week in which oil string is ant. Submit weekly for workovem and following salting of oll string until completion. ARCO ALASKA INC. ~ NORTH SLOPE Field ILeaSe or unit. ' I LISBURNE ~ L5-36 Date and depth Complete record for each day while drilling or workovnr in prograal as of 8:00 a.m. 04/03/89 (10) TD: 5809' ( 829) SUPV: DBJ/JER 04/04/89 (11) TD: 6825' (1316) SUPV: DBJ/JER 04/05/89 ( TD: 7507' ( 582) SUPV: DBJ/JE 04/06/89 ( TD: 8560' ( )53) SUPV: HMP 04/07/89 ( ) TD: 9126' ( ,66) SUPV: }iMP 04/08/89 (5) TD: 9917' ( 791) SUPV: HMP 04/09/89 (6) TD: 11264' ( 347) SUPV: HMP 04/10/89 (7) TD: 11429' ( 165) SUPV: 04/11/89 ( TD: 11850' ( 421) SUPV: HMP Well no. DOYON 9 DRILLING 10-3/4"g 4953' MW: 9.0 VIS: 39 FIN NO BOPE. PU BHA, RIH, TAG CMT AT 4842'. TEST CSG TO 2500 PSI FOR 30 MIN. DRLD CMT AND FLOAT EQUIP, AND 10' OF NEW HOLE. RUN LOT TO 13.2 PPG EMW. DRLD TO 5809'. DAILY:S57,490 CUM:$797,138 ~TD:$797,138 EFC:$2,723,000 DRILLING 10-3/4"g 4953' MW: 9.5 VIS: 41 DRLD TO 6249'. CBO, TFNB NO. 6, CHANGE BHA. RIH, REAM TIGHT HOLE. FIH, DRLD TO PD. DAILY:S56,541 CUM:$853,679 ETD:S853,679 EFC=$2,723,000 PULL WEAR RING 10-3/4"% 4953' MW: 9.5 VIS: 37 DRLD TO 6836', TFNB, DRLD TO 7507'. TRIP TO CHANGE BHA. PULL WEAR RING. DAILY:S64,840 CUM:$918,519 ETD:S918,519 EFC152,723,000 DRILLING 10-3/4"~ 4953' MW: 9.6 VIS: 39 COULD NOT REMOVE WEAR BUSHING. PO SPEAR, SPEAR SAME, PULL W/300,0009. WASH OUT STACK. RIH W/NEW BIT. DRLD TO 8560'. DAILY:S55,398 CUM:$973,917 ETD:S973,917 EFC:$2,723,000 DRILLING 10-3/4"~ 4953' MW: 9.6 VIS: 39 DRLD TO 8773', TFNB NO. 9. CHANGE OUT DYNA-DRILL. TIH, DRLD TO 9126'. DAILY:S58,172 CUM:$1,032,089 ETD:S1,032,089 EFC:$2,723,000 INSTALL NEW WEAR BUSHING 10-3/4"~ 4953' MW: 9.6 VIS: 41 DRLD TO 9917'. DROP SURVEY, TFNB NO. 10. PULL WEAR BUSHING. DAILY:$56,682 CUM:$1,088,771 ETD:S1,088,771EFC:$2,72~,000 DRILLING 10-3/4"g 4953' MW: 9.7 VIS: 42 TRIP IN HOLE WITH NEW BIT. DRLD TO 11264'. DAILY:S55,765 CUM:$1,144,536 ETD:S1,144,536 EFC:$2,723,000 DRILLING 10-3/4"~ 4953' MW: 9.8 ViS: 42 DRLD TO 11330', SURVEY, POOH. LD BHA, PU ROTARY ASSY. RIH, DRLD TO 11429'. DAILY:S57,136 CUM:$1,201,672 ETD:S1,201,672 EFC152,723,000 ff~KILL DOWN ANNULUS 10-3/4"~ 4953' MW: 9.8 VIS: 42 DRLD TO 11850', DRLD DRLG BREAK, LOST COMPLETE RETURNS. STUCK DP, JAR ON SAME. PULL FREE, WELL FLOWING. SWI, HAD 1600 PSI ON BACKSIDE, PRESSURE INCREASING. PUMP 9.2 PPG W/LCM DOWN BACKSIDE. PRESSURE DROPPED TO 1300 PSI. DAILY:S50,000 CUM:$1,251,672 ETD:S1,251,672 EFCt$2,723,000 The above is correct For form prel~aration and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 '~' AR3B-459-2-B INumber all daily well htalo~y forms as they are prepared for each well. consecutively JPage no. © ARCO Oil and Gas Company Dally Well Hi.tory--lnterim Instructions: This form is used during drilling or workover operations. If teetlng, coring, or_Perforating_, IhoW formation name In d.e. lcrlb, lnj~ work performad. Number all drill stem tests sequentially. Attach description of all coreS. Work perfo.rmad by I, rOduclng ~ectlon will be reported on 'lltllrlrn Iheetl until final completion Report officia or representative test on "Flail" form 1) Subm t "lnterlrI" sheets when ~led out but not all frequent y then every 30 deyl, or (2) on Wednesday of the week in which oil string is eat. Submit weekly for workoverl end following letting of oll etrlng Until completion, District Field LISBURNE Date and depth as of 8:00 a.m. ICounty or Parlbh zli~CO ALASKA INC. I NORTH SLOPE IL. es or Unit L$-36 Complete record for each day while drilling or workover in progrele 04/12/89 ( TD:11850'( SUPV:HMP 04/13/89 ( TD:11849'( SUPV:HMP 04/14/89 ( TD:11849'( SUPV:HMP 04/15/89 TD: 9100'( SUPV:HMP/JP 04/16/89 ( TD= 8600'( SUPV:HMP/JP 8titL DOYON 9 L) O) o) ~) o) KILL DOWN ANNULUS 10-3/4"9 4953' MN= 0.0 VIS= CONTINUE PUMPING DOWN ANNULUS. POMP 250 SI8 OF CMT DOWN DRILL PIPE W/ NO RESPONSE. PUMP 500 SIS OF CMT DOWN DRILL PIPE, REDUCE LOSSES. RIGGING UP TO LUBRICATE FLUID INTO BACK SIDE. DAILY=SO CUM:$1,251,672 ETD=SO EFC=83,974,672 MONITOR WELL 10-3/4"6 4953' MN= 9.2 VIS: 42 CONT MONITOR WELL. (8XDPP 150 PSI, SlOP 1200 PSI). CYCLIC LUBRICATION OF ANN. 8ICP WENT F/ 1190 PSI TO 75 PSI AFTER 17 CYCLES. MONITOR WELL. ATTEMPT TO CIRC. 8IDPP 210 PSI, SICP 160 PSI. CHOKE CLOSED. BEGIN PUMPING AT 1/2 BPM. PUMP 8-1/2 BBL AWAY. NEVER SAW CSG PRESS INCREASE. CHOKE NEVER OPENED. SHUT DOWN. SIDPP 250 PSI, SICP 160 PSI. MONITOR WELL. ATTEMPT TO CIRC AGAIN. OPEN CHOKE WIDE OPEN. CSG PRESS GOES TO 0 PSI. BEGIN PUMP AT 1/2 BPM. PUMP 4 BBL AWAY. 3-1/2 BBLRETURNS. 8IDPP 250 PSI. SICP 30 PSi. ATTEMPT TO CIRC 20 BBL SAME METHOD AS ABOVE. PUMP 8 EEL AWAY. NO RETURNS. SHUT DOWN. SIDPP 250 PSI. SICP 0 PSI. MONITOR WELL. 05=30 HRS SIDPP 175 PSI, SICP 85 PSI. DAILY:S224,015 CUM=$1,475,687 ETD=$1,475,$87 EFO=$2,723,000 LOADING CHARGES 10-3/4"9 4953' MN= 9.2 ViS: 36 CONT MONITOR WELL. MIX CMT. PERFOP. M CEMENT SQZ t 3 W/500 8X G. CIP AT 17=30 HRS, 04/13/89. MONITOR WELL WHILE WOC. SIDPP 210 PSI, SICP 170 PSI. RO SOS. LOG W/ TEMPEI~ATURE LOG. RD TEMPERATURE LOG. RU DEPTH DETERMINATION LOG. RIH W/ LOG TO TOO AT 11,478'. PRESS TEST DP PERF8. OK. RD 8WS LUBRICATOR AND RU FOR BIGGER WL. LOAD CHARGES FOR SEVERING TOOL. DAILY=S52,300 CUM=$1,527,987 ETD=SI,S27,987 EFC=$2,723,000 BLEEDING PRESSURE F/CSG 10-3/4"9 4953' MN: 9.2 VIS: 38 RIH W/ JET CUTTER, CUT PIPE AT 8607'. BEGIN CIRC ON CHOKE, CIRC DRY GAS AND GAS CUT MUD OUT. MUD TEMPERATURE OUT, 32 DEG. CONTINUE TO CIRCULATE. DAILY:S49,900 CUM:$1,577,887 ETD=S1,577,887 EFC=$2,723,000 WOO 10-3/4"6 4953' MN: 9.2 VIS: 40 CONTINUE TO CIRC DOWN DP AT 1.5 BPM AND 200 PSI BACKPRESSURE. HAVING SLUGS OF DRY GAS INTERMITTENTLY. CASING PRESSURE DECREASED, COULD NOT CIRCULATE. LOAD BACKSIDE WITH MUD, PRESSURE DROPPED TO 0 PSI.. MIX AND PUMP 532 SX OF CLASS 'G' CMT, SPOT PLUG FROM 8600 TO 7000'. WOC. DAILY:SS39,617 CUM:$2,117,504 ETD:S2,117,504 EFC:$2,723,000 IWell no. The above is correct ~ . . Signatuce .' ~\ \, ~ For form pr~lT)aration and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 . AR3B-459-2-B Drilling Supt. JUN 2 19 g Alaska Oil & Gas Co~e. CommlssloTt Anchorage iNu.ber e. da.~ we. hi.tory forme they are prepared for each well. consecutively ARCO Oil and Gas Company Dally Well History--Interim Instructions: This form is used during drillir~g or workover operations, If testing, coring, or perforating_, show formltion name In desorlb, lnR work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Produolng ~otlolt will be reported on "lltllrlnt sheets untl final completion. Report official or representative test on "Final" form. 1) Submit "latetlat" sheets when filled out but riot lc# frequently than avery 30 d&ye, or (2) on Wednesday of the week in which oil string ia scl Submit weekly for workovere and following letting of oll String until completl0n. District ICou.ty or Parish I Stet~ A~CO ALASKA INC. I NORTH SLOPE Field ILease or Unit LISBURNE I L5-36 Complete record for each day while drilling or workovor in progre81 DOYEN 9 Date and depth as of 8:00 a.m. 04/17/89 (21) TD: 4866' ( SUPV: HMP / JP 04/18/89 (23) TD: 4866'( SUPV:DBJ/JCP 04/19/89 ( TD: 5095'( SUPV:DBJ/JC 04/20/89 ( TD: 4900'( SUPV:HMP 04/21/89 ( TD: 5783'( SUPV:HMP 04/22/89 ( TD: 7189'( SUPV:HMP 0) 6) 229) 7) 0) 8) 883) 406) PULLING WEAR BUSHING 10-3/4"0 4953' M~: 9.2 VIS: 42 PRESSURE TEST CMT PLUG TO 1300 PSI, O.K. RIH N/JET CUTTER AND CUT DP AT 5497'. ATTEMPT TO CIRC, NO SUCCESS. WORK PIPE, UNABLE TO WORK FREE. MO STRING SHOT, BACK-OFF AT 4866'. CIRC LARGE AMOUNT OF SAND AND LCM. POOH. MO SPFJLR TO PULL WEARBUSHING. DAILY:S52,201 CUM:$2,169,705 ETD:$2,169,705 EFC=$2,723,000 JAR ON STUCK PIPE 10-3/4"S 4953' MW= 9.2 VIS= 44 MO SPEAR, PULL WEAR BUSHING. RIH W/BIT TO TOt AT 4866', CBU, WASH SAND AND LCM. POOH. PU WASH PIPE AND FIBHING ASSY, RIH. we F/4866'-5061'. POOH. PU SCReW-IN ASSY, RIH. SCREW INTO FISH, JAR ON SAME, NO MOVEMENT. DAILY:S753,033 CUM=$2,922,738 ETD=$2,922,738 EFC;$2,723,000 WOC 10-3/4"9 4953' MW= 9.2 ViS= 46 CeNT JARR AND WORK FISH. RU GEARHART. COUD NOT RUN FREE POINT THRU DC. POOH AND ADD WEIGHT BAR. RERUN FREEPOINT. SAME RESULTS. POOH. MO 1-11/16' SINKER BAR AND RIH TO 5200' - OK. POOH. MU BACK OFF TOOL AND TIH. POSITION SHOT AT 5102'. FIRED SHOT - NO INDICATION OF BACK OFF. WORK TORQUE DOWN. PULL 2 STNDS, CIRC AND COND MOD. POOH. RECV'D 7 JTS DP, BUMPER SUB, OIL JARS , GUIDE AND SCREW IN SUB. LD TRI-STATE TOOLS. MO CLEAN OUT RUN BHA. TIH TO 4860'. WASH AND ~ TO 5095'. CIRC AND COND MOD. POOH. PU 3-1/2" MULE SHOE AND TIH TO 5095'. CIRC AND COND MOD. BATCH MIX CMT. SPOT BALANCED PLUG. CMT W/ 625 SXS OF CLASS "G# CMT AT 17.0 PPG, F/5095'-4053'. CIP AT 04=40 HRS, 04/19/89. DAILY:S133,450 COM:$3,056,188 ETD=$3,056,188 EPC:$2,723,000 TESTING CSG 10-3/4"0 4953' MW: 9.2 VIS: 44 WOC, PU BIT, RIH. DP/d) CMT TO 4900', CBU. TEST CSG TO 2000 PSI, BLED OFF TO 1675 PSI IN 30 MIN. POOH, PU RTTS. RIH, ESTABLISH THAT CMT PLUG IS LEAKING. DAILY:S54,098 CUM:$3,110,286 ETD=$3,110,286 EFC=$2,723,000 DRILLING 10-3/4"0 4953' MW= 9.4 VIS= 50 TEST BELOW RTTS, LEAKING, TEST ABOVE TO 2000 PSI, O.K. POOH, PU BIT, RIH. DRLD CMT TO 4973', PRESSUR~ TEST SHOE. LEAKED OFF AT 11.8 PPG EMW. POOH. PU KICK-OFF ASSY, RIH. KICKED OFF AT 4973', DRLD TO 5783'. DAILY:S56,770 CUM=$3,167,056 ETD:$3,167,056 EFC:$2,723,000 DRILLING 10-3/4"9 4953' MW: 9.4 VIS: 41 DRLD TO 6065'. POOH, LD DYNA-DRILL. RIH, DRLD TO 7189'. DAILY:S54,013 CUM:$3,221,069 ETD:$3,221,069 EFC:$2,723,000 IWell no. The above is correct For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 Drilling Supt. AR3B~459-2-B INumber all dally woll history forms 88 they are prepared for each well. consecutively Page no. ARCO Oil and Gas Company Dally Well History--Interim Instructionu: This form is used during driliihg or workover operations. If testing, coring, or peHoratlng, show formation name In describing work performed. Number ali drill stem tests sequent ally. Attach description of all cores. Work performed by Producing Section will be reported on "ln#rl,l' sheets until final completion. Report official or representative test on "FInM" form. 1) Submit -Interim" ~heetu when fll ed out but not lam frequent y then every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovore end following setting of oil utring until completion. lCounty or Perish ~Stete District I NORTH SLOPE I AK ARCO ALASKA INC. I Field ILease or Unit LISBURNE I L5-36 ! Complete record for each day while drilling or workover in progrese DOYON 9 Date and depth au of 8:00 a.m. 04/23/89 ( TD: 8106' ( SUPV: HMP 04/24/89 ( TD: 8666'( SUPV:HMP 04/25/89 ( TD: 9238'( SUPV:HMP 04/26/89 ( TD: 9564'( SUPV:HMP 04/27/89 ( TD=10051'( SUPV:HMP 04/28/89 ( TD:10434' ( SUPV:DBJ 04/29/89 ( TD:10639'( SUPV:DBJ 04/30/89 ( TD:11032'( SUPV:DBJ 05/01/89 ( TD:l1350'( SUPV:DBJ ~0) 917) ~1) 560) ~2) 572) ;3) 326) ~4) 487) 383) 16) 205) ~7) 393) 8) 318) DRILLING 10-3/4"e 4953' MW= 9.5 VIS: 38 POOH, RECOVER SURVEY, CHANGE BHA, PO DYNA-DRILL. RIH, DRLD TO 8106'. DAILY:S59,170 CUM:$3,280,239 ETD:S3,235,239 EFC:$2,768,000 DRILLING 10-3/4"e 4953' MW: 9.7 VIS: 39 DRLD TO 8573', POOH. PULL ~AR BUSHING, CHANGE OUT DYNA-DRILL. RIH, DRLD TO 8666'. DAILY:S58,309 CUM:$3,338,548 ETD=S3,338,548 EFC:$2,723,000 TESTING BOPE 10-3/4#~ 4953' MW: 9.7 VIS: 45 DRLD TO 9238'. MWD TOOL QUIT WORKING, POOH, LD MND TOOL. PULL WEAR BUSHING, TEST BOPE. DAILY:S52,038 CUM:$3,390,586 ETD:S3,390,586 EFC:$2,723,000 RIH 10-3/4"% 4953' MW: 9.6 ViS: 40 FIN TSTG BOPE. RIH, TST MWD. DRLD TO 9564'. DROP SURVEY, POOH, PU PDC BIT. TIH. DAILY:S61,369 CUM:$3,451,955 ETD:S3,451,955 EFC:$2,723,000 POOH 10-3/4"% 4953' MW: 9.8 ViS= 41 CIRC AND WORK THRU SHOE. FIN TIH. DRLD F/ 9564' TO 9799'. CBU. SURVEY. POOH. CHNG BHA. HIH. DRLD TO 10051'. LOST 300 PSI POMP PRESS. CHECK SURF EQUIP. POOH LOOKING FOR WASHOUT. DAILY:S52,534 CUM=$3,504,489 ETD:S3,504,489 EFC;$2,723,000 DRILLING 10-3/4#% 4953' MW: 9.8 ViS: 39 POOH LOOKING F/WASHOUT, FOUND WASHOUT IN MWD TOOL. W/NEWMWD, DRLD TO 10534'. DAILY:S51,925 CUM:$3,556,414 ETD:S3,556,414 EFC=$2,723,000 TRIP IN HOLE 10-3/4"% 4953' MW: 9.9 VIS: 44 DRLD TO 10639', ROP SLONED. DROP SURVEY, POOH. PU NEW M~D TOOL, RIH. DAILY:S53,376 CUM:$3,609,790 ETD:S3,609,790 EFC:$2,723,000 POOH F/BHACHANGE 10-3/4"% 4953' MW:10.0 VIS: 41 RIH, REAM 300' TO BTM. DRLD TO 11032'. LOST GR FUNCTION ON MWD, POOH. DAILY:S62,153 CUM:$3,671,943 ETD:S3,671,943 EFC:$2,723,000 SPEAR/PULL ~EAR BUSHING 10-3/4#% 4953' MW:10.2 ViS: 42 TIH, DRLD TO 11350', MWD TOOL FAILED. POOH. PULL WEAR BUSHING, PREP TO SERVICE HELLHEAD. DAILY:S55,100 CUM:$3,727,043 ETD:S3,727,043 EFC:$2,723,000 IWell no. The above is correct For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-B RECEIVED UUN 2 1989. Alaska 0il & ~as Cons. Commlm~ion INumber all dally well history forms IPage au they are prepared for each well. consecutively no. ARCO Oil and Gas Company Dally Wall History--Interim Inetruotione: This form is used during drilllhg or workover operations. If testing coring, or._perfor.~tlng.~ show fo.~..m.atlon name. in d?.l~.rib, ln~ W. ork performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing ~eotlon Will De roportei] on "lltt~l'lltt sneetl until final completion. Report official or representative test on ,Final" form. 1) Submit "Interim" sheets when filled out but not lets frequently then every 30 deyl, or (2) on Wednesday of the week in which oil string ia set. Submit weekly for workovers and following ~ettlng of 011 string until completion, District lCounty or Perish 18teteAK ARCO ALASKA INC. I NORTH SLOPE I Field ILease or Unit LISBURNE ] L5-36 i Complete record for each day while drilling or workover In progrese DOYON 9 Date and depm as of'8:00 a.m. 05/02/89 ( TD:11667'( SUPV:DBJ 05/03/89 ( TD:11667' ( SUPV:DBJ 05/04/89 ( TD:11667' ( SUPV:GWC 05/05/89 ( TD:11711' ( SUPV:GWC 05/06/89 ( TD:11727' ( SUPV:GWC 05/07/89 ( TD:11727'( SUPV:GWC no. 9) 317) o) o) 1) o) 2) 44) 3) 16) 4) O) CBU, PREP TO SHORT TRIP 10-3/4"% 4953' MW:10.2 VIS: 42 PULL WEAR BUSHING, RUNNY DUb~iY HANGER, TEST SAME, OK. TEST BOPS. RIH, REAM TO BOTTOM. DltLD TO 11667', CBU, PREPARE TO SHORT TRIP. DAILY:S52,700 CUM:$3,779,743 ETD=S3,779,743 EFC:$2,723,000 LD LANDING JOINT 7-5/8"011650' MW:10.2 VIS: 46 SHORT TRIP, CBU, POOH TO RUN CSG. INSTALL 7-5/8" RAM~, RU CSG CREW. RAN 267 JTS. 7-5/$# 29.7% L-80 BTC/MOD CSG TO 11650'. MIX AND PUMP 507 SX OF CLASS 'G' + ADDITIVES. DISPLACE W/FULL RETURNS. DID NOT BUMP PLUG. LD LNDG JT. DAILY:S52,613 CUM:$3,832,356 ETD:$3,832,356 EFC:$2,723,000 PICKING UP 3-1/2" DP 7-5/8"011650' MW: 8.6 VIS: LD HWDP & 5" DP. TEST BOPS. PU BHA, STRAP SAME. PU 3-1/2" DP & RIH. DAILY:S226,547 CUM:$4,058,903 ETD:$4,058,903 EFC:$2,723,000 CIRCa COND MUD 7-5/8"011650' MW: 9.5 VIS: 39 FIN PU 3-1/2" DP, RIH. DRLD CMT, FC, 13' OF NEW HOLE. RUN LOT TO 12.8 PPG EM~. DRLD TO 11711', HIT BREAK. CHECK FLOW, WELL FLOWING. SIDDP - 200 PSI. SICP - 300 PSI. WT UP TO 9.5 PPG, CIRC ON CHORE. WELL DEAD. CONTINUE TO CIEC ON CHOKE TO DECREASE GAS. C&C MUD. DAILY:S54,911 CUM:$4,113,814 ETD:S4,113,814 EFC=$2,723,000 ClRC 7-5/8"011650' MW: 9.4 VIS= 38 ClRC AND COND MUD. DRLD TO 11,727'. LOST CIRC. PUMP LCM. POOH 5 STDS TO CSG SHOE. CIRC LCM AND BUILD MUD VOLUME. SHUT RAMS AND PUMP 13 BBLS DOWN BACKSIDE. HOLD PRESS. CIRC. OBSERVE WELL. CIRC - PARTIAL RETURNS. GAS RETURNS. SHUT W~LL IN. CSG PRESS CLIMBED TO 2650 PSI. LUBRICATE DOWN BACK- SIDE. DAILY:S74,097 CUM:$4,187,911 ETD:S4,127,911EFC~$2,723,000 LUBRICATE DOWN BACKSIDE 7-5/8#011650' MW: 9.4 VIS: 39 LUBRICATE BACKSIDE W/ TOTAL OF 150 EELS. SICP - 2700 PSI. SIDPP - 0. RU BJ TO SQUEEZE CMT. POMP 45 BBLS (250 SXS) AT 15.8 PPG CLASS 'G# CMT. CIP AT 12:35 }IRS, 05/06/89. WOC. SICP - 2700 PSI. SIDPP - 0. OBSERVE WELL. PUM~ DOWN DP AT 1/2 BPM WHILE VENTING DRY GAS. LUBRICATE MUD IN ANNULUS. PRESS RESPONCE INDICATES OBSTRUCTION (ICE) NEAR WELLHEAD OR IN ANNULUS. RU HOT OIL UNIT AND PREP TO LUBRICATE DOWN 3-1/2# X 7-5/8" ANNULUS. DAILY:S43,053 CUM:$4,230,964 ETD:$4,230,964 EFC=$2,723,000 The above ia correct For for~ pre~)aration and diStribUtion see Procedures Manual Section 10, Drilling, Pages 86 and 87 Orilllna B.~t. e AR3B-459-2-B I Number ell prepared for each well. las they are dally well history forml consecutively Page no, ARCO Oil and Gas company 4) Dally Well History--Interim Instzuctionl: This form is used during dri Iin'g Or workover operations. If tearing, coring, or_Pi~.,or.atlng~ ah_ow fo.r..m.atlon name. n d.e.-_,~rib, ln~ w. ork performed: tiall Attach description of all cores Work performed by ereauclng ~eetlon Will Da repollaa on 'lnllflnt inlatt until flnll Number all drill stem tests sequen Y' * - ,, ,, ', " "has s when filled out hut not lau frequently than avery 30 day8 or (2) completion. Report official or representative te~t on Final form. 1) Submit Inlerim s..__t_ ' on Wednesday of the week in which oil string is set. ~ubmlt Weekly for workovere and following ~ettlng of oll ttrtnfi until completion. ARCO ALASKA INC. NORTH SLOPE District IOounty or Pariah LISBURNE I Field ILease or Unit I DOYON 9 Date and depth Complete record for each day while drilling or workover in progre~l as of 8:00 a.m. 05/08/89 (45) TD: 11727' ( 0) SUPV: GWC 05/09/89 (i6) TD: 11727' ( 0) SUPV: GWC/H} P 05/10/89 ( 17) TD: 11727' ( 0) SUPV: GWC/HM 05/11/89 (8) TD: 11739' ( 12} SUPV: DJ 05/12/89 (9) TD: 11759' ( 20) SUPV.' DBJ 05/13/89 ( 0} TD.' 11774' ( 15) SUPV: DBJ The above is ~;oig~ct f.~ For form pre;)aration and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 ATTEMPT TO LUBRICATE GA~ F/ ANNULUS. P~MPED 7 CYCLES OF 15 BBLS EACH. CSG PRESS DROPPING. PUMP DOWN DP TAKING RETURNS. SHUT IN NELLAND OBSERVE. SICP - 450 PSI, SIDPP" 0. RESUME CIRC THRU CHOK~. SHUT IN WELL. SICP INCI~ED TO 2050, SIDPP - 100. RES~ ¢IRC AT 20 SPM. DAILY:S61,029 CUM=$4,291,993 ~TD=$4,291,993 REPAIRING DEGASSER 7-5/8"%11650' MW= 9.5 VIS= 38 CIRC THROUGH CHOKE ~ 2 BPM HOLDING CONSTANT DRILL PIPE PRESSURE. SHUT DOWN ~ 200 BEL~ TO PUMP COT TANK. SICP REDUCED F/ 2050 TO 1475 PSI. RESUM~ CIRC ON.CHOKE % 2 BPM. SHUT DOWN ~'~00 BBLS TOTAL PUMPED TO P~JP OUT TANK. SCIP - 400 PSI. RESUME CIRC ON CHOKE ~ 2 BPM. SHUT DOWN ~ 930 BBLS TOTAL PUMPED. SICP - 150 PSI. SHUT IN & MONITOR WELL, SIDP FELL F/ 150 TO 0 PSI, BLED OFF CSG PRESS F/ 150 TO 0 PSI ~ 1630 HRS. REPAIR DEGASSER SICP-92, SIDP-0 ~ 0600. DAILY:S46,936 CUM=$4,338,929 ETD=$4,335,929 EFC=$2,723,000 CIRC & MONITOR WELL 7-5/8"~11650' MW= 9.5 VIS= 36 REMOVE OLD GAS BUSTER, INSTALL NEW ONE. CIRC THRU CHOKE WHILE MONITORING WELL. CIRC AT 3 BPM AT 950 PSI. DAILY:S43,900 COM:$4,382,829 ETD=$4,352,929 EFC=$2,723,000 WOC 7-5/8"~11650' MW: 0.0 VIS= MONITOR WELL. WELL DEAD. CBU. RAISE MW TO 9.6 PPG. POOH. CHNG BHA. TEST BOP'S. INSTALL NR. RIH. CIRC AND REDUCE MW TO 9.5 PPG. REAM F/ 11413' TO 11711'. TORQUED UP. CONT REAM TO 11727'. LOST RETURNS. DRLD F! 11727' TO 11739'. NO RETURNS. POOH TO 11600'. REGAINED RETURNS. CALCULATE LOSS RATE OF 200 BBL/HR. MIX CMT. PUMP 250 SIS CLASS #G# CMT AT 15.8 PPG. CIP AT 03:30 HRS 05/11/89. MONITOR WELL. WOO. DAILY:S53,124 CUM=$4,435,953 ETD=$4,435,953 EFC=$2,723,000 CIRCULATE W/PARTIAL RTRNS 7-$/8"911650' MW: 9.5 ViS: 44 MIX AND SPOT .250 SX CMT ON BTM, WOO. LOSS RATE 150 BBL/HR. MIX AND SPOT 250 SX CMT PLUG, WOO. LOSS RATE 100 ESL/HR. DRLD TO 11759', FORMATION FIRMED UP AT 11756'. SPOT 64 BBLS OF 50 PPB LCM, LET HOLE H~AL. NO LOSS OR GAIN. MIX AND SPOT 250 SX CMT, WOC. CIRC~TLATE W/$$% RETURNS AT 4 BPM. DAILY:S125,360 CUM=$4,561,313 ETD=~4,$61,313 EFC=$2,723,000 TIH TO SPOT CMT PLUG 7-5/8"$11650' MW= 9.5 VIS= 39 DRILL CMT TO 11759', LOST RETURNS. DRLD TO 11774, SHORT TRIP, SPOT 92 BBL OF 60 PPB LCM PILL. PULL 35 STDS, CBU TWICE. MAX GAS 4194 UNITS. FIN POOH. PU 3-1/2" DP, RIH OPEN-ENDED TO SPOT CMT PLUG. DAILY:S55,972 CUM:$4,617,285 ETD='$4,617,255 EFC=$2r723~0O0 IWall no. AR3B-459-2'B INumber ail dally well history form; consecutively aa they are prepared for each well. IPage no. ARCO Oil and Gas Company Dally Well History--Interim rm i used durin drlllln or workover operations If testing coring orperforating show formation name In dsecrlblng work performed. Instructiona: This fo s g g - , , ,, ,, Number all drill stem testa sequentially. Attach de$cr psion of ell cores. Work performed by Prod. ucln.~..$?ctlon will .be. rep?ted o~ laterlm ahaetl until final completion. Report official or representative teat on "Final" form. 1} Submit "lnterl111" ahaete wlten nlleO out but hot lese frequently then every 30 daya, or on Wednesday of the week in which oll string ia set. Submit weekly for workovera and following setting of oll string until completion. District Field A~CO ALASKA INC. LISBURNE County or Pariah IState NORTH SLOPE Lease or Unit L5-36 Date and depth as of 8:00 a.m. 05/14/89 ( TD:11774'( SUPV:DBJ 05/15/89 ( TD:11774'( SUPV:DBJ 05/16/89 ( TD:11774'( SUPV:DBJ 05/17/89 ( TD:11791'( SUPV:DBJ 05/18/89 TD: 11950' SUPV: HMP 05/19/89 ( TD:11988'( SUPV:HMP/TE: 05/20/89 ( TD:12146'( SUPV:HMP/T~ Complete record for each day while drilling or wor~ver In progresl DOYON 9 51) ~2) 0) o) ~4) 17) ~5) 159) ;) 38) 7) 158) DRILLING CMT 7-5/8"g11650' M~: 9.5 VIS: 40 RIH OPEN-ENDED. MIX AND SPOT BALANCED CMT PLOG OF 250 8X G. PULL 20 STDS, CBU. POOH, PO BIT, RIH. WASH AND REAM F/10464' TO 11063'. CBO. WASH AND REAM TO 11465', TAG HA~D CMT. DRILLING MEDIUM HARD CMT TO 11537'. DAILY:S83,570 CUM:$4,700,855 ETD:S4,700,855 EF¢:$2,723,000 RIH TO SET BALANCED PLUG 7-5/8"g11650' MW: 9.5 VIS: 38 DRLD CMT F/11537' - 11625'. REPLACE KELLY. DRLD CMT W/FULL RETURNS TO 11697'. BIT APPEARED TO SIDETRACK AND DRILL NEW HOLE. DRLD LISBURNE TO 11738', LOST RETURNS. MIX AND SPOT 230 SX CMT PLUG. OBSERVE NELL, NELL STATIC. POOH, SET BACK BHA, RIH W/OPEN-ENDED DP. DAILY:S74,016 CUM:$4,774,871 ETD:S4,774,871 EFC:$2,723,000 WASH & REAM 7-5/8"~11650' MW: 9.5 ViS: 39 STAGE IN HOLE W/OPEN-ENDED PIPE. MIX AND PUMP 300 SK BALANCED CMT PLUG ON BTM. PULL 13 STD8, CBO. POOB, PO BIT, BHA, RIH. WASH AND REAM TO BOTTOM. DAILY:S97,576 CUM:$4,872,447 ETD:S4,872,447 SPOT LCM PILL 7-$/8"~11650' MW: 9.4 VIS: 40 WASH & REAM TO 11210', TAG CMT AT 11210'. DRLD FIRM CMT TO 11620'. .CBU, CONDITION MUD TO 9.4 PPG. DRLD CMT TO 11741', LOST PARTIAL RETURNS. DRLD FORMATION TO 11791', LOST COMPLETE RETURNS. SPOT 75 PPB LCM PILL ON BOTTOM, PULL 20 STANDS, LET HOLE HEAL. RIH, BRK CIRC, W/10-40% RETURNS.. SPOT 30 BBLS OF 75 PPB LCM PILL ON BTM, LET BOLE HEAL. DAILY:S78,836 CUM:$4,951,283 ETD:S4,951,283 POOH TO UNPLUG BIT 7-5/8"811650' MW= 9.4 VIS: 40 SPOT LCM PILL AT 11650'. DRLD TO 11950' W/PARTIAL TO NO RETURNS. SPOT LCM PILL, MONITOR MUD LOSSES. LOSS RATE 6-11 BPH. POOH TO UNPLUG BIT. DAILY:S86,741 CUM:$5,038,024 ETD=S5,038,024 EFC=$2,723,000 DRILLING 7-5/8"~11650' MW: 9.3 VIS: 38 POOH, UNPLUG BWDP AND DCS OF LCM. RIH, BRKCIRC AT 4081', 8051', AND 10016'. REAMED FROM 11715' TO 11950' W/40-60% RETURNS. DRLD TO 11988' W/25% RETURNS. DAILY:S56,344 CUM:$5,094,368 ETD:$5,094,368 EFC:$2,723,000 DRILLING 7-5/8"e11650' MW: 9.3 VIS: 40 DRLD TO 12045', SHORT TRIP TO SHOE, NO HOLE PROBLEM~. 511 UNITS OF GAS MAX. DRILL TO 12146'. DAILY:S74,771 CUM:$5,169,139 ETD:S5,169,139 EFCI$7,832,139 IWell no. The above is correct ~ For form~prep~ration a~d distribution see Procedurea Manual Section 10, Drilling. Pages 86 and 87 AR3B-459-2-B Number all dally well hiatory forms consecullvely aa .they are prepared for each well. IPage no. ARCO Oil and Gas Company Dally Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or_pel~.orotlng_, show formotlon nome In ds. lc. rib. In~ work performed, Number all drill stem tests sequentlalty. Attach description of ell come. Work performed by Proouolng ~eoflon will be reported on "llll~rl#t sheets until finnl completion. Report official or representet ye test on "Final" form, 1) Submit "Interim" shes. ts when filled .out but not lam freSuontly than every 30 doyl or (2) on Wednesday of the week in which oil string- ia set, Submit weekly for workover~ and fei owing sets ng o! Oll Itrmg until completion. District ~County or Perish 18toto$~l~ ARCO ALASKA INC. I NORTH 8LOPE I Field ILease or unit LISBURNE I L5-36 Date and depth as of 8:00 a.m. 05/21/89 ( TD:12172'( SUPV:HMP/TE: 05/22/89 ( TD:12172'( SUPV:HMP/TE 05/23/89 ( TD:12172'( SUPV:HMP 05/24/89 ( TD:12172 PB: SUPV:HMP 05/25/89 ( TD:12172 PB:11416 SUPV:HMP 05/26/89 ( TD:12172 PB:11416 SUPV:DBJ/JE 05/27/89 ( TD:12172 PB:12166 SUPV:DBJ/JE Complete record ~r each day while drilling or workover In p~gmlo DOYEN 9 Well no. ,8) 26) ;1) 7-5/8"%11650' MW: 9.4 ViS: 43 DRLD TO 12172', SHORT TRIP, RAISE MW. CXRC AND CONDITION HOLE TO RUN CASING. POOH. DAILY:S61,127 CUM:$5,230,266 ETD:S5,230,266 EFC:$2,723,000 9) O) RXH W/LNR 7-5/8"911650' MW: 9.5 VIS: 50 FIN POOH, CHANGED TOP RAMS TO 7", ~ELL STARTED FLOWING. RXH W/DP TO 4024'. CBU. RIH W/NO RETURNS TO 11070', CSU W/709 RETURNS. MUD CUT TO 8 PPG. SPOT LCM PILL. RIH TO 12172', NO TIGHT SPOTS. POOH, LOSING MUD AT 1/2 BPM. MU LINER AND RIH. DAILY:S98,091 CUM:$5,328,357 ETD:S5,328,357 EFC:$2,723,000 o) o) RIH W/BIT & SCRAPER 5-1/2"912172' MW: 9.4 VIS: 46 RIH W/5-1/2" LINER, BRKCXRCULATION AT 4050' AND 10050'. PUMP SPACER FOLLOWED BY 165 SX SS II CMT MIXED AT 14.8 PPG. BUMP PLUG, SET LINER, INFLAT~ ECP. POOH TO 8958', MONITOR WELL. POOH, LD EXCESS 3-1/2# DP, RIH. DAILY:S154,556 CUM:$5,482,913 ETD:S5,482,913 EFC:$8,145,913 ;2) RIH 5-1/2"912172' MW: 9.4 ~BM RIH TO TOP LNR AT 10416'. CBU. TEST LNR LAP. INJ RATE OF 2 BPM AT 675 PSI. POOH. MU SQUEEZE PER. RIH TO 11079'. SET PER. RU DOWELL. SQUEEZE LNR W/ 100 SIS RFC CMT AT 14.2 PPG & 100 SIS CLASS #G# CMT AT 15.8 PPG. CIP AT 19:30 HRS, 05/23/89. RELEASE PACKER. POOH SLONLY. LD SQUEEZE PER. MU BHA AND RIH W/ BIT AND SCRAPER. DAILY:S66,380 CUM:$5,549,293 ETD:S5,549,293 EFC:$2,723,000 ,3) DRXLLXNG CMT 5-1/2"912172' MW: 9.4 FXH #/6-3/4" BIT, DRLD CMT TO TOL AT 11416'. CBU, TEST LINER LAP TO 2900 PSI. O.K. POOH. TEST BOPE.. PU 4-3/4 BIT AND BHAAND RIH. DRLD CMT FROM TOL AT 11416'. DAILY:$161,780 CUM:$5,711,073 ETD:S5,711,073 EFC:$2,723,000 The above is correct Signstu[e ~ ~, ~'~ For form'~repar~tion and ~is{ri~ution ~e Procedures Manual Section 10, Drilling, Pages 86 and 87 DRLG CMT 5-1/2"912172' MW: 9.4 ~ WASH AND REAM TO TOL AT 11416' AND BELOW TO 11465'. PLUGGED BIT, COULD NOT CIRCULATE. POOH, LD BTM 24 JTS OF DP. PU NEW BIT, BHA.. RIH. WASH AND REaM RATTY CMT F/11390' TO 11730'. DRLD HARD CMT F/11730' TO 12006'. DAILY:S42,948 CUM:$5,754,021 ETD:SS,754,021 EFC:$2,723,000 RXH W/BRIDGE PLUG 5-1/2"912172' MW: 9.4 WEN DRLD HARD CMT TO 12102'. TEST CASING TO 2200 PSI FOR 30 MIN. O.K. DRLD CMT TO 12166', CBU, POOH. RU ATLAS, LOG 2 PASSES FROM PBD TO TOP OF LXSBURNE. LGG 1 PANS FOR STATE TO 10-3/4# SHOE. MAKE GAUGE RING AND JUNK BASKET RUN. RUN EZSV BRIDGE pLUG TO BOTTOM. DAILY:S52.569 CUM:SS.8OG. SOO RTD~S.~O~.~O~ ~_T~_~ AR3B-459-2-B INumbor all dolly well history forms consecutively au they ere prepomd for each well. IPage no. ARCO Oil and Gas Company Dally Well History--Interim Instructions: This form is.used during drilling or workover operations. If testing, coring, or per/orating, show formation name In descrlbinJ~ work performed, Number all drill stem tests sequentially. Attach description of all cores. Work perJormed by Producing Sectloh will be reported on "Interim sheets until final completion. Report official or representative test on "PInar' form. 1) Submit "Interim" sheet8 when filled Out but not lose frequently then avery 30 days, or (2) on Wednesday of the week in which oil string ia set, Submit weekly for workovers and following setting of oll string until completion, District I I Complete record f~8~while drilling or workover In prog~M Date and depth aa of 8:00 a.m. TD: 12172 ~B:12166 · SO~v: D9~/~: WLIH W/EZSV. SET SAME AT 12161'. MO BIT AND CSG SCRAPER. RIH TO PBD. PUMP HI-VIS SWEEP AND DISPLACE W~LL WITH 9.4 PPG NACL. POOH, LD 3-1/2" DP AND BHA. TEST CSG TO 2500 PSI FOR 30 MIN. RIH TO 400', DISPLACE TOP 400' OF ~LL WITH DIESEL. POOH, PULL WEAR RING. INSTALL DOi~4Y HANGER W/BPV. CHANGE OUT TOP SET OF RAMS TO 5", ND BOP STACK. DAILY:S108,305 CUM:$5'914,895 ETD:$5,914,895 IWell no. The above is correct ~,~ , For form'~repar~tion an(] distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-B INumber all daily wall history forms consecutively as they ere prepared for each well. Page no. ARCO Oil and Gas.Company Dally Well History-Final Report Inelruetione: Prepare and submit the "F~ .~* Rlll~rl~' o. lz ll~e first Wednesday after allowable hll been Sleighed or well II Plugged Abandoned or acid. "Final Reporl" should be submltt;d altO~.wlterroperMIoni*, suspended for an Indefinite or appreciable length of time. On workovere when an official teat Ii not required upon completion, report completion end repre~enteUVe teat data In blocks provided. The "Pla&l Relm~l" form may be ulad for reporting the entire operation if space is available~. District Field Auth. or W,O, no. ICounty or Pariah Lease or 'Unl't [~O~'.l.'~l ~.t;~- IAccounting State ooat oenter oode ~I~ I Well no, I t,5-36 Operator Spudded or W.O. begun SPU]~ [:)ate and depth as of 8:00 a,m. 05/29/89 TD:12172 PB:12166 SUPV:DBJ/, IA.R.Co. W.I. ~i;~&'U:~9-rl~l;.l~mber of welll (active or Inactive) on this, Ioo,t center prior to plugging end I .... labandonment of this well :::::::_ I- "'"°' IDate '1 Prior ltltUl 21:30 Complete record for each day reported RIG RELEASED 5-1/2"912172, MW: 9.4 WBM FINISH ND HOPE, INSTALL TBG HEAD, TEST 8AM~. NU DRY HOLE TREE, TEST. CLEAN PITS, FREEZE PROTECT L5-36 ANNULUS. RELF. ASH RIG AT 1200 HR$ $/28/89. DAILY:S51,310 CUM:$5,966,205 ETD:$5, g66,205 EFC:$2,723,000 66) Old TD I New TD I PB Depth I I Released rig loire IKInd of rig Classifications (o11. gas, etc.) Type completion (single, dual, etc.) Producing method Official relewolr name(a) Potential test data Well no. Date Reservoir Producing Interval OII or gelTelt time Production 011 on reit Oas per day Pump size, SPM X length Choke size T.P. C.P. Water % QOR Gravity Allowable Effective date corrected The above is correct ~i"gnet"re x ' ~ ~X,_% ,Oa~e X ITM AR3B-459-3-C INumber iii dilly well hlltory forml aa they ere prepared for each well. oonlecutlvely iPege no. Olvlllofl of AtllnUdlloldlddCompiny ARCO ALASKA LISBURNE ENGINEERING DATE: 5-31-89 FROM: TINA KINCAID ENCLOSED IS THE FOLLOWING DATA FOR LISBURNE: FINAL FOR L2-24 COLLAR LOG DIFF TEMPERATURE LOG GAMMA RAY PERFORATING RECORD RUN I 4/30/89 RUN I 4/30/89 RUN I 5/10/89 'RUN I 5/12/89 FINAL FOR L3-24 PROD PROFILE LOG DRESSER ATLAS DRESSER ATLAS DRESSER ATLAS SCHLUMBERGER FINAL FOR L4-18 RUN I 4/20/89 CAMCO 5/12/89 4/25/89 4/26/89 PROD PROFILE LOG RUN 1 PHYSICAL FORMATION LOG GAMMA RAY RESISTIVITY LOG CAMCO SCHLUMBERGER 'SCHLUMBERGER SIGN AND RETURN TO: TINA KINCAID ARCO ALASKA, INC. 700 G STREET; ATO 409 .~ J~ r.' ,,," ~,N,C~AGE,.~SKA 9951 0 RECEIVE~J - ~ ~ / klaS~m0il& ~ Anchorage P~NO STANDARD D&M · STATE OF ALASKA CENTRAL FILES TRANSMITTAL # 615 MEMORA.N.. . State of Alaska ALAS~ OIL AND GAS CONSERVATION ~ISSION Lonni e C. DATE: Ap. ri 1 18, 1989 TO: ~ission.~' ~ F~LE NO: D. HRB. 026 THRU: FROM: Mi chae 1 T. Minder ~~.~. Sr. Pet rO I e~ Engi nee r pH:rold R. Hawkins tl~o leum Inspector TELEPHONE NO: SUBJECT: We I 1 Kiek Cont ro I & P lug Settir~ P.e~:~ "~. 89-36 Lt~ Oil Pool ~_s_~Y.,-_.~ri!. !_1. ,_. !989.__,. i left Anchorage at 7:15 asa by AlaSka Alrliit~s-to :~Udhoe-,' Arriving at $:45 am. I met Doug A~os and he told me the water pump was going out on the pick-up. I took the pick-up over j to Naehoes Garage, Pi ek-up was repaired by $: 30 pm. I went. directly to Doyan Rig 9 on well L$-35, where there wa8~ kick. l-~rrived on location at 4:3~ pm.. Information was taken fr~ .the /~$, up to when I arrived at 4:30 pm. The following were t~':step$ t'a~en to seCUre the well in a kill mode. ~,_...~i!..!~., !989, .Lost ?ire!Elation .and .~t stuck at 11,849, l~St~-all ~etu~$', j-ironed on pipe ~hile fillin[-hoie on backside., lost $9~ bbls of 9.8 mud, partial returns at 6:30 / Ptl)e was freed and started flow (O Tubing) shut well ISIP SIDPP circulation was performed thru choke 9.6 M~ 309 PM w 3{){1 PSI ~P + 9-0 PSI CP Gas at surface 4:45 pm, well was shut in. 9(10 SICP + ~ SIDPP vented gas out diverter and shut well back in for 30 mtn, observed increase SIDPP up to 1~?$ PSI, continued t'o circulate at SPi~ while ventinE gas out choke line. 1~ midnight. ~esd.ay,_ .Ap~i. 1 . I.!,_ _.!989,.. vent ed gas through choke, pumped down D.P. at 30-bbl~/mfn at"' 175 'PSI. Shut well in at 4'700 stkS, casing press. 2650 PSI. Rig up to pump down annulas. 1:15 am observed gas bubbles in cellar, pressure was vented off through choke from casing and was drawned down to ~000 PSI, oil/~dd ca_me to surface. 1:30 am all hands were evacuated from ri~/ power was shut off to sub, pits, 2:SO ara p~d down armulas at well head, power was put back on to rig, Pump-was started L(~ down annulas (initial press 2150, max 2450.) 10:00 am continued pumping down open hole annulas through 5.5 i D,P. at $ bb!./-min at I0~0 PSI Casin~ and 0 PSI on DP, arrived on location .about 4..80 pm, at ?~,~1 pm guns wore run in to preforate DP at I1,$'10-ii,$"18 Fad/(8 ft at 4 shottl per foot). Mud on location pits 90 bbl.s 9,2 w/L C Id - pits 490'b bls 9,~ olean mud gOO bb'Is f~om bar~)t-d wi L C M ~othe~ ~0 bbls of 9.~ ele~ (on way). ~ d~ ~u!as at ~ bblil/mtn, iaj~ti0n .~-atm at ~9 spm at 5 bbls easi~ 4~0 ~I, ~ut ~, .~ to d~i!t Pipe and bled to se~o psi. .................... 8~45--':"~----~'ll'~'wa:~'~"'ah/ut--~ in', a t:a~t'ed" "3-O m'f~'~'~e~-~e'-'~'e~'ek~ 'Not JnJ~ti.n~ Jn either ~las or d~tll ~Jpe. 9JJl ~ p~t~ J60 ~le ~f L C M'd~ ~ d~ill pipe at 1 B~ folle~ by e~nt,(J59 sacks w.t,/lS,S class 'G'), wait $ hou~$ fo~ e-~ent to .,_..~A~.ri.!~_._!~.~...~__{.SS~9..,: 512:00, am approximately ~L00 sacks 100 bbls '~!.'~S '~:-~' 'IS'~8' 'p/~d-'~~ . . dF! 11 piP~ I. S houF8 p~ tim, through PK~$ tnto..~nulas. Castn~ PSI 14S0 PSi, ftni~ed ~nttnf DPP $75 ~'I fi~l DPP 6-00 ~I, a~ula8 ~eFeao~ 1400 PSI at the e~. ~is was dtopl, ae~d at 3~06 m with S bblo wateF ~d 196 bblo 9.2 md. Initial SI DPP - 0 Qasi~ 1410 PSl/0S,mJn 200 ~I on DP 18~0 on annulao at O~O0 m, ~tend.ed pFooe~try to-p~ 16 bbll 9~ bbl8 ~d thFough P~ and baQk ~ 10 8/4'~asing fo:~ each test. ~e bubbles of gao tn QellaF have ol~d down oonoJ~FablY at this ~lnt. Initial [~. 9,t ~1 I$IP { 10 Iii bbls bbI8 bbts Poet SI ISiP IS Bled I8IP 18 Min To Min SIP 1. 1190 1100 ~. 1195 115'0 {.- lX2ii- 1150 1078 4. 1025 1060 !008 S. 1000 10t:O 1010 0. O00 9X0 040 ?. 800 830~' 800 8, ?40 ?60 YOO X~.350 4.00 460 1 t00 1~00 I000 O00 8!0 lOmii XleS 1080 1100 1128 1!50 ll?$ 10~0 1100 112ii 110~ 1100 000 900 lO,ii 10?0 1100 1000 000 1000 1088 1080 000 800 026 1000 1000 800 ..800 mS0 800 890 710 ?40 ?40 8-26 860 8.40 840 ilS0 8ii0 660 440 460 440 (ii IEB~ ii0{ St'~okes) 13,250 310 - - 310 O00 Slii 318 14. -~.15 300 - - 300 200 180 180 100 1~ , t80 300 - - O00 ~eO 14S t48 18.145 310 - - 800 ~20 110 128 180 IY, 126 400 - - 380 380 ~S ~S 1~0 18. Y5 850 - - ...... April 1~, 198.0 LUbFieate test finished at 10:80 pm, ~Urq~]~,...~il 13,~ !~8:~, Disouseton between Bi, it B~own, Kirk White, ~i-i='i"~:'-l~'~t~:~~-~;--'H~5~="Pete~$on, oireulatt~ th~ou~ ~S and baek ~ a~ulas with 0,~ md e~ld ~t be porfo~, In the discussion it ~s-decided to do ~et~r o~nt Job t~oufh the oxiotlnf P~ in the 6' hea~ wall to open hole annulas. C~_nt ingeney p I ~, dFi I I pipe semen:ti ng t brough PIlRFB i n S" D.P. int o ~-~ hole ~qnulas. ~is ~II be third emnt Job ~rfomd. Injeotion rate ~ls mina 960 lbs'. 4.~5 (~dit.ionS 0.~6 ~ DIAS) Ina DP - {SO PSI iSIOY 30 PSI. ~e ~~t I6.8 p~ o~eat p~ed th?ough P~8 to open ~le a~ula8 wee ~00 ks. ~si~ presages afte~ e~ntinw (X0 mine lapsed) SIDPP 180 ! $iCP ~30 FSi. ~ere was ~00' eal.~lated omnt in drill pipe ~ve P~$ at Il.SiX,. btimted o~nt tn d~ill pipe 11,300' s~eese~no 3 finished at -There was a t~tu~-e survey pe~fomed, rigging up and survey took f?om~O~00 pm until about-11~3~ pm. The mui-vey ahowed that the top of the oement pt~ t~tstde §-" DP was at 0100' ~!~Y~,~_.~_~_i'_!_~.~,_.__.~9~. A depth detez~ntnation lo~ was perfox~ned and ~-h~'-b~-~t'~i~--'t~'-~f-~.~ement instdm S~ DP at 11,4~8~ (~* able pelfs. Inside S' ~), ~e d~Pth detemination bar was pulled ~ into lubri- ~ato~ ~ wire line ~s were ~losed, a presm~e test inside ~ d~ill minvtes, At 6~30 ~ 6~ DP was ~hot off at ~07' el ~eUl at i on of 9.2 ppg md th~e~h DP are~~ and up ~nulam was att~t~, gas kept building up, At 10~l~ m Wally We~thinwton, ~nry Pete~son, and I conversed with B~Jt Br~ at ~oho~awe, abo~t Was prelim. It was decided to do a~the~ l~rieatlon ~ of tests to t~2 and stabilise the gas, to a lower point, Sl d~ill pipe was TS0 PSI and easing 9ICP was 939 PS!, ~e lub~ioatl~ tests were.~ not t~ be pe~fomed until t~e blow ~ line f~ ~ke ~tfold was ohanwed. Wail~ o~de~ed opposite dtFeetion8 th~ is ~w flowinK, because the wind eh~red and fas was bl~In~ bask to Fi~. 9.4 ~ was oFdeFed on location. Talk With Brit B~ was ove~ 10~42 m. ~bFleati~ teats weFe started at I0=45 m, ~e:~e were i0 lubFteatt~ teat F~o, ~on teats started the eastn~ $I~ was 8~0 ~I, the S. IDPP was 7!0 PSI, ~ test pereeeded thresh 10 runs the Si~ was d~n to T0 PSI, the SIDPP was 75 psi. At 6=00 ~ ~I left well shut in to see If It was st~bili=ed. 8=00 ~, eiFeulatton th~~ 5e dFtll pipe into annulao wa8 attired with 9,2 lb ~d. ~at~r~.~ ~'t!.' t.$~ 19'89, Circulation attempt was not successful ~:f~t~-~l~§-O;":~-i"~'~d~='5~~d, circulation at t~t was stopped about 11~30 m. A b~ld~ in ~uias w~ p~obablm. A dmteminatton stretch point was perfo~d to satiate ~e a brl~ mi~t be. this was perfo~d, a~..~/~-b~t~ was estimated e.lose to 19 S/4 shoe. At ~ ~lw~in~ Up fo~ ru~in~ a f~e point test indieato~ was being pe~fo~ed, t~ f~ee point test was e~lmted at ~'tO0 ~. indicated pipe was stuck ~d bri~ In the ~nulas at shoe of X0 3/4 at 4~S~'. Shoe ts at 4~3'. ~in~ e~nt started at 10t39 ~ and was e~leted a~t' ltzl6'~, d~n 'the"-~' d~i'll pipe '~t*nto the OPen hole annu. ias. whale.pipe was. cut off at B69~*.., .With 60.9 masks ~lams oe~nt with 9,~5~ Dt3S l~,$ ~, there was estimted to be Z0 e~nted above 880~' up to ~500' inside 6~ d~ill pipe and a~roxi~tely the see heist in the open hole a~ulas. .... ~!F~.:~_~.~1:~9_8_~_,~ I witnessed a pFessuFO test of the oement pl:~:':'i~!'~--Sw-~"d~Xll~p~pe to XSO0 ~1 ro~' ~S ~n, the~e was no leak off. ~.-.test was penford S~3'O m. I left the l~atlon at OtO0 sunnazy, i witnessed all phases ~ kllli~tS~ and pluswinf st the ~SSO-,o~~sy. ~ll xe, ~080. Z reit that the well was seou~ed that potat. ~en the last e~at J~ I witnessed ~s o~!eted on ~Fil I~* 18~ ~dpFemm~ test of tb dFtll pipe was peFfomd on ~Fll X6, 1~* ~e~e t8 q~lt a bit of woFk left before well t8 safe drilit-~, ~e pl~s ~ ~la8, plus t~ ~eh oboe-led 10 ~te8 of' ~asmi~a~inw to t~ s~faoe ~taide lO 8/4* oasinf and Con. erst in t~ eella~', w~n-I left-- At t aehmen t 7 PATe:_ ,¢/I/ IrCP. . _ .' Ac~,,.jAD L5,36 KILL PROCEDURE 1. MIRU Schlumberger, Rig up manifold to pump down drillptpe. Rig up two TIW valves, pump in sub and wireline BOPE'$ with blind rams. Screw TIW valve on drillpipe and position pump' in sub between wireline BOPE's and TIW valves. 2. Have two cement trucks rigged up on annulus a minimum of 100' from L5-36 so that cement personnel, trucks and manifold are a safe operating distance from well, if well was to completely broach to surface. Continue pumping down. backside at 3 bpm with rig pumps. 3. Pump 300 bbls of clean 9.2 ppg mud to clear drillpipe. Stop and notify office if it appears that drillpipe is packing off, Perforate B' of bottom joint of HEVI weight {Joint above collars) with 4 spf total of 32 holes while pumping at 1/4 bbl/min down drill pipe, POOH. Close blind rams on wtreline BOPE's to isolate lubricator. Keep lubricator rigged up. 4. Stop pumping down backside, monitor and record pressure for 30 minutes to obtain a baseline comparison. Resume pumping down backside. If pressure increases above 1700 psi on casing, resume pumping immediately, otherwise resume pumping after 30 minutes. 5. Mix and pump 250 sx Class "G" down drillptpe. Follow cement with drtllpipe volume plus 5 bbls of 9.2 ppg mud to over displace cement out of bit by 5 bbls. Continue pumping down backside at 3 bpm until cement reaches bit. When cement reaches bit, stop .pumping down backside. Monitor casing pressure. If pressure increases above 1700 psi, resume pumping. If both annulus and drillpipe pressure increase after resuming pumping, in other words if cement starts working and casing pressure increases above 2000 psi while pumping down annulus, put well on choke and f. lntsh disp. lacement..down drillplpe, Maintain casing pressure below 2000 psi-. 6. WOC for 3 hours. Monitor and record drillpipe and csg pressure. Contact office. Plan on pumping 3-5 cement plugs, If casing pressure increases above 1700 psi, resume pumping down annulus at 3 bpm. Concur: Area Dril 1 i rig Eng'i'n'~;1~ Concur': S'~'perilntendent~ Concur: Regi ona~~i' i.~ee-r 031/RBO Approve Drill lng Manager ...... ARCO Alaska, Inc. v AFENo. ~-0~ IRpt'NO° 17 Last casing Date lShoe Test Daily Drilling JEs{. cost to date I ~oO lDrl, Waler r DRILLING ANrR~:yP DATA Depth i wt. PU ' .180. Avg~ K~t Max. _ Drag. ~O lDrag. J'~¢ K~ Trq ' I Trq Ope'atio,~ iRot Hfs on Jars MUD DATA Mud type 2L~ u,j L-///'~/~' MBT ~),. ~,.. ,~'"' We,ght ~, ~ + ppg pH V~scosity Z~ ~. sec ¢)~' .y~ ]Bariteo/ ~. 0 s,tcement ~ 2-/ 5- i1' 5' Pm i' $ Pf ° '7 AP, W.L q' ~ cc I Chlorides f I 00 ppm HTHP 100 psi ~ cc I Oil -- O/o I HTHP 500 psi ~ cc j OWR ~ I so,,ds 7 - Sand ° 02~. °/o ILGS I I Hole VoL ~ g .?.. bbl J Pit. vol. ..~-~_~ bbl I Da,ly Mud S ~770 I Total Muds Bit No. Size Mak9 Type Serial No. 1'5'Z { Progre;s~ .~- Depth Out Footage Hours WOB R.PM BIT DATA 1o P~ pp IZ Iq/3 12/Z~" hrs. ZS--! '2.10 rpm hrs. / K# Cond (TBG) JetslTFA ' ~"~' 2-13 l-lZ Acc,dems? BIT COST Who? 0 SURV. NO. r'~DT~ ANGLE DIRECTION T.V.D. Van. Sec. · . North./South East/West Dog Leg Depth Mud Wt. Formation Backgroun~gas C~nn. gas / Trip gas / t rpm I Est. pore press. / / ROPlShale sx I Fuel MUD LOG DATA PPg "u Pump No. Liner Size SPM (1) Press· (1) SPM (2) Press. (2) gm/cc PPg fph I Slow P.S, , ROPISand fph ~ ~ psi 1 ~ in. ~' in. I "~ spin ~"'~ spin ~/~--O psi psi · ..------spm' ~ spm psi psi 7_ O spm ~,O spin Signed TIME I HOURS ! I ,1...,, ti' OPS FR 0600 -- 0600 psi ARCO Alaska, Inc. Daily Drilling Well k ~ '" ~) ~ Last casing IL~./~ '~ 4 ~3' [Shoe Test.~,~,~ I Da~s~n7' ' sr~/est. Contractor ~ Dopth~ ', J Pr. re,~ Operation at 0600 , ~ Daily cos~ I ~OU.. O0,t MUD DATA BIT DATA MUD LOG DATA DRILLING AND PUMP DATA Rot. K~ Mud type. MBT Bit No, Depth Depth Wt. P,U. K~ S.O. K~ Weight ppg pH Size Mud Wt. ppg Wt. Wt. Avg. K~ Max. K~ Viscosity sec Pm Make Formation Drag. Drag. Trq. fi.lb. Trq. fi.lb. PV / YP / Pf Type Background gaa u Btm. Off. Gels / Mf Serial No. Conn. gas u Pump No. · 1 2 APl W.L. cc Chlorides ppm Depth Out Trip gas u Liner ~ize in. in. HTHP 100 psi cc Oil % F~tage ff. ff. M~BGG u 8PM (1) spm spm HTHP 500 psi cc OWR Hours hrS. hrs. DC Ex~nent Press. (1) psi ps~ Solids % ES WOB / K~ / K~ Shale density gmlec 8PM (2) spm spin Sand % LGS RPM rpm rpm Est. ~re pre~. ppg Press. (2) psi psi Hole Vol. bbl Pit. vol. bbl Cond ~BG) / / / / ROPIShale fph , Slow P.8. spm spin . Daily Mud $ Total Mud $ Jets/TFA ROPIS~d fph Slow P.P. psi pm Accidents? BIT COST Sign~ Who? SURV. NO, DEPTH (MD) ANGLE DIRECTION T.V.D. VeR. Sec. No~h / South East / West Dog Leg TIME HOURS OPS FR ~-- ~ APR-OJ-'8985:5~ trip Tank Pit Cause Flow Honitor Cas Detectors .BOP£ Stack Annular Preventer. ..... Pipe Ra~.s ........ ~lind Rams 'Choke Line Valves .gL,] u_~.L! .... ~~__ .... _ ............ . .... ~ ....... _. Representative Test Pressure .. -__ ·. __~o.., i'' Full Charge P:ecsure._.~~_ . Psis · Pressule After Closure~~)___. psiS. M,. C.R. Valve. L_L Kill Line Valves__~Z_4 Check Valve____ Ii .... Test Results: Failure's ._ ~o. flanges .... ~.~_.. ....... Pump incr. tics. pres. 200 puig min~_Z_~ec Full Charge PTessure Attained: / min.~_sec _ mo9 __ · ........ Controls: Master .,~ Remote _~i!, Blinds switch cover __ ;:~O' ana Floor ~.are~y V.n!~e!~ ' . U~per Kelly, ,.[, Test Press.re~ Lo.er Kelly ,, ] ,,, Test Pressur~ 'Sail type ..... ! ~..~est Press.re~ Inside BO~ I Test Pressure--S_ Choke Manifold Test P~'essur~_~ddO ..... Adjustable Chokes: :-.- ...... ~:: , ~e~ ........... Rvdrauic __,crated choke ~__c ..... _' . Test Time --~%.,-_hrs .... Repair or Replacement of failed equipmint to. be ~.ade within Co~nission office notified. · and Inspector/ Hatch 21, 1989 Teleaopy, (907) 276-7~2 Pradhoe. hy/Lisb~e L5~-36 Permit Ne, 89-36 Su~, Lee, 2387'~SL, 37'~, See. 1, TllN, ~lSE, Z~le Lee. $70-'~, t653'F~, See, 35, Dear ~. ~see~ew, ~elose~ ia ~he ap~_.roved application for permit to drill the above ~efe~enc~ veil. ~ ~e~lt to ~i!l ~ mee ~t yo~ £rom obeatninf additional ~e~8 .re~!~e~ by ~ ~r~ o~her ~e~u~al asperse, and ~es ne~ ~~~e ~~~ns ~Ii~ ~er.a~ono ~c~l all ocher ~qut~ed pe~c~ ~e~ci~o ara a. td us ~n s~du!~$ ~eld ~zk, please ~a pr~or co ~~ t~CallaC~ o~ Ch bl~uc prevention ~-~p~c so, ch~ a repFesencaC~ of Ch ~as~on my be p~esenC Co w~cneso teoC.i~ o~ ~e ~~t ~fore che surface ~s~ng $~e ~s '~!lied, 'bEe a d~ver~er oyo~ is weber'ed, p~e~se-a~:~ ~c~y ~h~s off:~ee 2~ ~rs pr~or co c~cinS esters orx~nA ~e~ow ~he shoe of the eond~cor p~pe. Atas~ Oil ~d Gao ~ae~aCion Co~ael~ BY ORDER~ OF THE COHi~SS~ON ~osure Depa~_emenc o£ F~sh & C~ne, Habitat Section w/o encl. Department e~ Env~ronmen~l Conservation w/o oriel. Q STATE OF ALASKA ~ ALASKA AND GAS CONSERVATION C ISSION PERMIT TO DRILL 2O AAC 25.OO5 I la. Type of work Drill [] Redrill i-II lb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil Re-Entry [] Deepen[]1 Service [] Developement Gas [] Single Zone IG Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. Pad 20' RKB 56 feet ~rudhoe Ba;y Field 3. Address 6. Property Designation ~isburne 0il Pool P.0. Box 100360, Anchorage, AK 99510-0360 ADL 28320 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) Prudhoe Bay/Lisburne St;al:ewi de 2387'FSL, 37'FWL, Sec. 1, T11N, R15Es UN At top of productive interval 8. Well nurpber Number 800'FNL, 1560'FEL, Sec.35s T12N~ R15E, UN L5-36 . No. U-630610 At total depth 9. Approximate spud date Amount 370'FNL, 1653'FEL, Sec.35, T12N, R15E, UN 03/28/89 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line From L5-32 1 2520 'ND 2893' ~ surface feet 119' @ Surface feet 2560 9022'TVD feet , 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 1000'feet Maximum hole angle49 0 aaximumsurface 3372 pslg At total depth (TVD) 4490 pslg 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91,5# H-40 Weld 80' 35' 3,5' 115' 115' 2nnne 13-1/2" 10-3/4" 45.5# J-55 BTC 4854' 34' 34' 4888 4000' 1500 sx AS III & 350 sx G + 9-7/8" 7-5/8" 29.7# L-80 3TC MOD 5614' 33' 33' 5647 4500' 300 sx Class G w/ 9-7/8" 7-5/8" 29.7# L-80 BTC 6873' 5647' 4500' 12520 9022' Additives , 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural SCu°rl;;;tOr Intermediate Production MAR 2 u Liner J~aS~ DJ!& Gas C0n~ Perforation depth: measured ~'~i,'~lC~Oi.agl~ ' true vertical 20. Attachments Filing fee [] Property plat [] BOP SketCh i~r Diverter Sketch i~ Drilling program [~ Drilling fluid program ~ Time vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements [] 21. I hereby certify that the foregoing is true and correct to the best of my knowledgel4illJ,~ Signed /o Title Regional Drilling Engineer Date / Commission Use Only (MDD) PD3/070 Permit_Number I APl number I Approval date I See cover letter ~'~.~'~/'~'~ I 50-O.z. 9-.2-_/~ ,.~3 I 03/21/80 l for other requirements Conditions °~a~"~roval Sample. s required [] Yes~ No Mud log required [] Yes ~'No Hydrogen sulfide measures '~ii~'Yes [] No Direcfron-aJ survey required ~'Yes [] NO Required workin~l,.l~res~re f~OP,[~ []2M; ~ [] 3M; ~ 5M; [] 10M; Other: //.~//~~~~~~,....~., by order of ,/ Approved bL..Z ,~, ( ~./~~~~,~ Commissioner the commission D_ ate~.~f'. _/.e~' Fnrm 1~-~B1Rnv 124-RR icate LISBURNE L5-36 PRELIMINARY WELL PLAN DRILLING PROCEDURE 1) MIRU Doyon 9. 2) Drill 13-1/2" hole to IO00'MD/TVD. Kickoff and build angle at 2.5°/100'MD to 48.8° in a N 12° 15' W direction. Maintain hole angle and direction to 10-3/4" casing point at 4888'MD/4000'TVD. 3) Run and cement 10-3/4" casing to surface. 4) Drill 9-7/8" hole to TD of 12520'MD/9022'TVD. 5) Run open hole logs. 6) Run and cement 7-5/8". Displace cement w/completion brine. 7) RIH w/drillpipe to 400' and displace top of casing to diesel cap. 8) Install dummy hanger and master valve. Release drilling rig. 9) Run cased hole logs. 10) MIRU completion rig. 11) Run 2-7/8" single completion string. 12) Release completion rig. 13) Perforate and stimulate. NOTE: a) Excess non-hazardous fluids developed from well operations and ~s~necessal~y ~i~in~lUs of. ~n~... . · The annulus will' be left with a non-freezing fluid durin§~a~y extended interruption in the disposal process. The annulus will be sealed w/250 sx of cement followed by Arctic pack upon the completion of the fluid disposal process. b) The drilling fluid program and fluid surface system will conform to the regulations set forth in 20AAC25.033. c) Maximum surface pressure is based upon BHP of 4490 psi at 9020'TVD, less an oil column to 8409'TVD, less a gas column to surface. d) Well within 200' of the L5-36 is: L5-32 119' away at surface e) No potential hazardous levels of H2S are anticipated in this well. 070/PD3 .......................... I ' · · 1 I I I I I I ..... I RKI~ ~]~VA~r~O~ 56' D.~,~ ~ ~" C~ ~ 15 ~115 .... 120 L5-35 S~: ~8 7' FSL & 37'  '~o S~: ~ T:.~ R~SE ~ ~o~ ~: 8~' ~ & 1560' ~.s S~: 35 q'l~ R15E ~ ~o N 12 15' ~ 2~ ~ ,, ~ 4zs ~C ~~ ~=2953 D~=783 4~ A~GE ~O~ = 48.8 6~0 ~AR 2 0 t~ ~ Oil l Gas ~n~ ~ intuition K-10 ~76~ ~1~1 D~ K-5 ~7~ ~10821 80~ ~n, 3 ~8956 ~1~19 D~7~8 1~ ............................................................... 11~ ~RTIC~ SE~ION © ARCO ALASKA, INC. L5-36 N 12 15' W E - W COORDINATES -5000 -4000 -3000 -2000 -1000 0 1000 1000 3000 -~)00 -~ 300 -3~)00 -2)00 -1}00 ) 1,)00 21~00 31 8001 8OOO 7001 7OOO 600~ 6OOO 500t ~000 400t 4OOO 30(0 3000 1000 0 -lOO -300 ~CO ALASKA, INC~Q ~" L5-36 E - W COORDINAT~ -400 -300 -200 -100 0 100 200 300 1.5-28 / 9~ Il /' ~ 2315 400 ~ 400 L5-32 200 '~1:i~69 ' 200  3515 1~ ~9 ~ ' ~nn 100 L5-29 o~ ~,- /.~ o ~ -3~ -~ -1~ 0 1~ ~ 3~ E - W COORD~A~ L5-36 MUD PROGRAM P1 as Density Visc. Depth (TVD) #/gal (CP) Yi el d Point Initial IOM #/1 O0 ft2 Gel Gel FL CC/~OH ~ ~ pH and Oil Solids Type of Mud Surf 8.8 Funnel to to 160- 10-3/4" 9.2 250 Csg Point 40-60 30+ 50+ NC 0 8 Gel-Benex Spud Mud Operate all solids removal equipment to maintain PV as low as possible. cement contami nati on. 10-3/4" ..... SET 13-3/8" CAS I NG~ Csg Shoe 8.8 Minimum 6 2 5 15 to to Possi bl e to to to to K-lO 9.2 12 5 10 2.5 Pretreat with Btcarb or soda ash for 3.5 Low Sol ids to Non-dispersed 6.5 Seawater Operate all solids removal equipment to maintain weight as low as possible. K-10 9.2 10 6 2 5 4 0 4 to to to to to to to to to 7-5/8"Csg. Pt. 9.8 15 10 4 8 8 5 8 Low Solids Non-dispersed Low Lime .25 to .50 ppb excess lime w/30,O00 ppm Cl through Lisburne. To control potential shale problems in K-10 to K-2 interval, increase mud weight only as required. DO NOT weight up prematurely. Expect some possible gas cutting below the top of the K-lO shale. Use degasser as necessary. If torque or drag becomes excessive, treat system with crude oil as required. control equipment, maintain finest shaker screens possible. --SET 7-5/8" CASING Maximize use of all solids lon daily service company mud report, log hours that desilter, desander, and degasser are run; and the number of cones in operation and size of shaker screens being used. Report volumes injected or dumped to reserve and water used. 2This mud plan is a guideline only. These exact mud properties, including mud weight, need not be maintained if rig supervisory personnel feel hole conditions warrant otherwise. Any radical changes should be discussed with Anchorage before implementation. 02-22-89 O1 6/MDD TYPICAL MUD PIT SCHEMATIC 32 32 . BBLS BLS _ TRIP TANKS SANDTRAP (30 BBLS) ODEGA88ER (8:3 BBLS) DESILTER (07 BBL8) (97 BBLS) PILL PIT (~S 8BLS) DESANDER (36 BBLS) SUCTION PIT (448 BBLS) MIX PIT (122 BBLS) DRAWING IS NOT TO SCALE NOTE: SYSTEM IS EQUIPPED WITH A DRILLING FLUID PIT LEVEL INDICATOR WITH BOTH VISUAL AND AUDIO WARNING DEVICES AND A FLUID FLOW SENSOR LOCATED IN THE IMMEDIATE AREA OF THE DRILLER'S CONSOLE. JQ 7/24/87 SURFACE HOLE DIVERTER SYSTEM SCHEMATIC ARCO ALASKA, INC. FILL-UP LINE ,, I' 2000 PSI DIVERTER RISER ,,,, I FLOWLINE 10" BALL VALVE 10" BALL VALVE CONDUCTOR NOTE: ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND VENT LINE. THE SECOND VENT LINE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS A~A 5 10" VENT LINES m mm mmm ,mm mm mm m m WELL ' m ' I I" I r' i I i ! I RIG MODULES NOTE: 100' FROM ANY IGNITION SOURCE ALL TURNS 90 DEGREE TARGET TEES mm mm mm mm m ~m m mm mm mm m mm mm mm mm mmm m mmm mm m mm m m m m m m m m m m m m m m m m m m m m m m RESERVE PIT JO 7/27/87 1:3-5/8" PSI BOP STACK' IA( RAI"I ACCUMUI. ATOR,,CAPAt;: ITY TEST J · 'j ANNULAR '] i BLINDRAHS j DRILLING SPOOL PI PE RAMS DRLG SPOOL CSG SPOOL 10-$/4' STARTING HEAD ALL BOP EQUIPMENT 5000 PSI RATED 13. 14. 15. 16. 17. 18. 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSi DOWNSTREAM OF THE REGULATOR. :5. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TiME AND PRESSURE REPIAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME'AND 1200 PSI REMAINING PRESSURE. !:~-5/~, BOP STACK TEST 1. FILL BOP STACK AND I'iANIFOLD WITH A NON-FREEZING LIQUID. 2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED. HARK RUNNING ,JOINT WITH PREDETERHINED PLUG SEATING DEPTH. RUN TEST PLUG ON DRILL PIPE AND SEAT IN WELLHEAD. RUN IN LOCK DOWN SCREWS. 3. CLOSE ANNULAR PREVENTER AND UPSTREAI'I VALVES. 4. FUNCTIONALLY TEST CHOKES. 5. IN EACH OF THE FOLLOWING TESTS, FIRST HOLD A 250 PSI LOW PRESSURE TEST FOR k HINIHUH OF :5 HINUTES, THEN TEST AT THE HIGH PRESSURE. 6. INCREASE PRESSURE T AND HOLD FOR A HINIMUM OF :5 MINUTES. BLEED PRESSURE TO ZERO., 7. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR AT LEAST :5 MINUTES. BLEED PRESSURE TO ZERO. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES AND OPEN CHOKES. INCREASE PRESSURE TO AND HOLD FOR AT LEAST :5 MINUTES. BLEED PRESSURE TO ZERO. 9. OPEN TOP SET OF PIPE RAMS THEN CLOSE BOTTOM SET OF PIPE RAHS. INCREASE PRESSURE TO 5000 PSI BELOW THE BOTTOM SET OF PI PE RAMS AND HOLD FOR AT LEAST :5 PII NUTES. 10. TEST REMAINING UNTESTED MANIFOLD VALVES (IF ANY) WITH 5000 PSI UPSTREAPI OF VALVE AND ZERO PRESSURE DOWN- STREAM. 11. BLEED PRESSURE TO ZERO. OPEN BOTTOM SET OF PIPE RAMS. 12. BACK OFF RUNNING dOI NT AND PULL OUT OF HOLE. CLOSE BLI ND RAHS AND TEST TO 5000 PSi FOR AT LEAST $ MINUTES. BLEED PRESSURE OFF ALL EQUIPMENT. OPEN BLIND RAMS. MAKE SURE PIANIFOLD AND LINES ARE FULL OF NON-FREEZING LIQUID AND ALL VALVES ARE SET IN DRILLING POSITION. TEST STANDPIPE VALVES TO 5000 PSI. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI. CHECK OPERATION OF DEGASSER. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. PERFORM COMPLETE DOPE TEST ONCE A WEEK AND FUNC- TIONALLY OPERATE DOPE DALLY. ARCO Alaska, Inc. ~:~,!i j Post Office B~ 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 6, 1988 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT: Conductor As-Built Location Plat (Wells 17, 25, 32, 33, 36) Dear Mr. Chatterton' Enclosed is an as-built location any questions, please call me at Sincerely, Gruber Associate Engineer JG'hf plat for the 263-4944. Enclosure subject wel 1 s. If you have RECEIVED Oil & C33 Certs. Commiss~,o~ Anchora~a GRU13/1.2 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany  sec. ~ sec. t 'Q I ~' VICINITY MAP i 340 ~ LOCATED WITHIN PROTRACTED SECs. I ~ E ~ ~ II N., R. 15 E., U. M. 031 . LS. 17 Y=5 974950,40 LAT.= 70°20'03.099" eZ9 30° ~ X= 7172~1.S6 LONG.~148014'13.914 027 28~. ~, 1823' ~S.L. 155'EE.L. EL.= ~.1 25 260 e23 ~0 L5.25 Y=5 975190.51 LAT.: 70°20'05,459'' ~ , .2~ ~o ~ x= ~~.~ LON~.= ~.e~.'~3.7OS'' 019 e2( 2063' F.S.L. 148' [E.L. EL= 19.8 ~ L5.32 Y= 5 975 400.34 LAT. = 70°20'07.4~" , .,LEGEND~ i~ ~ el~~ X= 717 446.51 LONG. · 148°14'08.4~0' ~ ~9 I °D 2268 KS.L. 33' KW.L. EL= 19.8 I EXISTING WELLS o7 18~ o PLAN WELLS ~5 °6 L5-33 Y=5 975 4~0.37 LAT.= 700~0'07.818" ~ ASBUILT WELLS 03 ~4 X= 717 271.~8 LONG.-- 148°14'13.507'' , 2303' ES.L. 141' EE.L, EL~19.7 X= 717 446.61 LONG. = 148014 '08.31~ " I ~ R387'FS.L. 37' KW.L, ~= 19.9 I HERE~ ~IFY THAT t LICENSED TO PRACTICE LAND SURVEYING IN ~E STATE ~ ~. g~s~s OF~OCAT;ON ~S LS~O~T, ~ CSSOUTH ~ASKA, AND T~T THIS PLAT D;~CC S~TE ~ONU~E~TS. REPRESENTS AN A~LT SURV~ ~. Acc COOrDiNATES SHOWN ~RE A.S.R ZONE MADE BY_~ ME~ OR UNDER MY ~~~XX~ ~ ~s ~PE~I~ION, AND T~T A~ ~c OF A~~ OF ELEVATION. IS ARCO DATUM (MLLW) DIME~'IONS AND OTHER ~TAI~ ~,~%''"~" D F :_ ~ ~,' ~, -t~ ~ . ~ ~ ARCO Alaska~ .Inc. ~ ~~ ~*' H DRILL SITE L5 ~ O~T I ~,~ ~;~:~*} ~'".~ ..... '_'..~. ...... :~ CONDUCTORS ~'~ ~ ~'~" ~:~'~: '~.~ · DEANCI~;Mt~L' ' .- ~*~ ' ~ f,~ '. No LS~3 . ~ ASBUILT LOCATIONS -';~ ~; L~ C~'~ C~~'*~':~ ~ ' ' ..' ~ , ' . ~ ~..~r/SS;ON 0,88 ~9-5-88 ~ ORJG,NAL '1~/[~ [~r.'by B,' ,Ckby ~ ,Shim, of, Rev. ~ ByI ID°re DeScdPti°nI Appv'd. Dwg. No. NSDP-O~-CEA'4100-O09 ,,,, ,,~ ,, , ,, ,, , CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE (3) Admin (I0 and 13) 12. 13. (4) casg ~'<.f~.f~. ~-~--s? (14 thru 22) (5) Bop_.E, ~~. '~-,~-A~ ~ (23 thru 28) Lease & Well No. Company Is the permit fee attached .......................................... 2. Is well to be located in a defined pool ............................. 3. Is w~l located proper distance from property line .................. 4. Isw~.~.~., located proper distance from other wells ................ "... 5. Is su-~i~ient undedicated acreage available in this pool ............ 6. Is well to be deviated and is wellbore plat included ................ ?. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ....................... YES NO - 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number ......................... Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of; drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings .. Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst. Is this well to be kicked off from an existing Wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed e · · e e® · · e · · ee eee· · · · · · ee e~e · Is a diverter system required ....................................... ~ , Is the drilling fluid program schematic and list of equipment adequate ~4~ .. Are necessary diagrams and descriptions of diverter and BOPE attached. ~ ............. Does BOPE have sufficient pressure rating - Test to A'~o~ psig .. ~ ..... Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. . (6) OTHER 29~~th~ Geology~ Engineering: DWJ ~ LCS '-/d~4];FJA-~ rev: 01/30/89 For exploratory and Stratigraphic wells: 29 ~re data 'presented potential overpressure zones? · ? on e e · · e e · · · · · ee · · · · 30. ~Are ?seismic analysis data presented on shallow gas zones ............ 31. If an offshore loc., are survey results of seabed conditions presented / 32. Additional requirements ............................................. ~ Additional Remarks: ' iNiTiAL ' GEO. ' UNiT .... ON/OFF .... POOL CLASS STATUS AREA NO. SHORE Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the roadability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIXl .. ., No special'effort has been made to chronologically ;.: organ~e this category of information. COMPANY NAME : ARCO:i ALASKA, INC. 1dELL NAME : L]:SBURNE L5-36 FI:ELD NAIqE : PRUDROE BAY/L]:SBURNE POOL BOROUGH : NORT'N SLOPE STATE : ALASKA . AP:]: NUMBER : 50-029-21933 REFERENCE NO : 73367 RECEIVED JUN 2 6 ]989 Alaska 0ii & Gas Cons. Commissioj1 Anchorage IS TAPE VERIFICATION LISTING CHLUMBERGER' ALASKA COMPUTING CENTER 1T-JUN-1989 '12:48 PAGE: · ~ RE.EL HEADER SERVICE NAME : GCT DATE : 89/'06/17 ORIGIN : FLIC REEL NAME : 73367 CONTINUATION # : PREVIOUS REEL : COMMENT : GCT~ ARCO LS-369 PRUDHOE BAY/LISSURNE POOL9 API ~50-029-21933 · ~ TAPE HEADER SERVICE NAME : GCT DATE : 89/06/1T ORIGIN : FLIC TAPE NAME : 73367 CONTINUATION # : 1 PREVIOUS TAPE COMMENT : GCT, ARCO L5.-36~ PRUDHOE BAY/LISBURNE POOL~ API ~50-029-Z1933 · ~:~ FILE HEADER FILE 'NAME : GCT o001 SERVICE : FLIC VERSION : OATE : 89/06/17 MAX AEC SIZE :: 1096 FILE TYPE : LO LAST FILE : SCHLUMBERGER WELL SERVICES COMPANY NAME: ARCO ALASKAt INC. NELL: LISBURNE L5-36 FIELO: PRUDHOE BAY/LISBURNE POOL BOROUGH: NORTH SLOPE STATE: ALASKA API NUMBER: 50-029-21933 LOCATION: 2387t FSL ~ 3Tt FgL SECTION: 1 TOgNSHIP: 11N RANGE: 15E PERMANENT DATUM: MSL ELEVATION: 0 [S TAPE VERIFICATION LISTING ;HLUMBERGER ALASKA COMPUTING CENTER 1T-JUN-1989 1Z:~8 LOG MEASURED FROM RKB 59 ABOVE PERMANENT DATUM ELEVATIONS KB.' 59 DF.' 58 GL: 2.0 DATE LOGGED: RUN NUMBER: TO DRILLER: 09-JUN-89 ONE 1217Z CASING CASING 7 5/8" 29.7 LB @ DRILLER DEPTH OF 0 TO 11650 5 1/2" 17 LB g DRILLER DEPTH OF 11416 TO 12172 TYPE FLUID IN HOLE: BRINE MATER DENSITY: 9.4 TIME LOGGER ON BOTTOM: 15:15 09-JUN LOGGING DISTRICT: PRUDHOE BAY LOGGING ENGINEER: PORTER WITNESS: JACKSON TOOL NUMBERS: TCC-B 281 GCPC-B 735 GCIO-A 14 · GDM 715 GCAO-A 7251 GCEC-A 713 TCM-AB 95 FIELD REHA'RKS: WELL HEAD LATITUDE = 70°352 DEGREES TARGET AZIMUTH = 3~8o066 OEGREES MEAN WELL AZIMUTH FROM SPERRY GYRO = 348°683 OEGREES SCHLUMBERGER MEAN WELL AZIMUTH = 348.155' OEGREES DATE JOB STARTED: 1&-JUN-89 &'OB REFERENCE NO: 73367 LOP/RNA: J. KOHRING PAGE: COMPUTING CENTER REMARKS: CLIE~NT SUPPLIED AZIMUTH OF 347.75 USED IN COMPUTATION. THIS LIBRARY' TAPE ALSO INCLUOES EXTRAPOLATEO VALUES OF GCT DATA FROM GCT LAST REAOING (11120ole) TO DRILLEReS OEPTM (I'ZITZe)o TABLE TYPE : CONS TUNI VALU OEFI CN ARCO ALASKA~ INC. COMPANY NAME FN PRUDHOE BAY/LZSBURNE POOL FIELD NAME WN LISBURNE LS-36 WELL NAME NAT! USA NATION STAT ALASKA STATE OR PROVINCE COUN NORTH SCOPE COUNTY SECT I SECTION IS TAPE ¥'ERIFICATION LISTING CHLU#BERGER ALASKA. COMPUTING CENTER 17-JUN-1989 12:48 PAGE: 3 TUNI VALU DEFI TOWN RANG FL ENGI SON APIN APIN 11N 15E 2387~ FSL F. 37t FWL PORTER 364054 50-029-21933 50-029-21933 TOWNSHIP RANGE FIELD LOCATION ENGINEER'S NAME SERVICE ORDER NUMBER API SERIAL NUMBER API SERIAL NUMBER TABLE TYPE : CURV OEFI DEPT DEPTH CHANNEL NAME GDEP GYRO DEPTH VOEP TRUE VERTICAL OEPTH AS CHANNEL HLAZ OEVIATION AZIMUTH DEVI DEVIATION NSDR NORTH SOUTH DRIFT EWDR EAST WEST DRIFT COMPONENT CWEL CURVATURE OF THE NELL DATA FORMAT SPECIFICATION RECORD SET TYPE - 64. EB ** TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 34 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 [S TAPE VERIFICATION LISTING :HLUMBERGER ALASKA COMPUTING CENTER 17- JUN-1989 12:4.8 PAGE: ~ S:ET TYPE - CHAN f~ NAME SERV UNIT SERVICE AP/ AP! API AP! ID ORDER ~ LOG TYPE CLASS MOD FILE NUMB NUMB SIZE REPR NUMB SAMP ELEM CODE PROCESS (HEX) DEP'T FT 364*054 O0 000 O0 0 GDEP GCT FT 364*054 99 000 O0 0 VDEP GCT FT 364*054 99 000 O0 0 HLAZ GCT DEG 364054 99 000 O0 0 DEV! GCT DEG 364054 99 620 11 0 NSDR GCT FT 364*054 99 620 11 0 EWDR GCT FT 364*054, 99 620 11 0 CI, IEL GCT D/HF 364,054 99 000 O0 0 I I I 4* 68 0000000000 I I I 4* 68 0000000000 1. I I 4* 68' 0000000000 I I I 4* 68 O0000000OO I I I 4* 68 0000000000 I I I 4* 68 0000000000 I I I 4 68 0000000000 I I I 4* 68 0000000'000 *:~ DATA ~: DEPT. 65535.500 GDEP.GCT OEVI.GCT 0.000 NSOR.GCT DEPT.. 65500.000 GDEP.GCT OEVI.GCT 0.725 NSDR.GCT DEPT. 65400.000 GDEP.GCT DEVI.GCT 51.373 NSDR.GCT DEPT. 65300.000 GDEP.GCT DEVI.GCT 53.597 NSDR.GCT DEPT. 65251.000 GDEP.GCT DEVI.GCT 51.483 NSDR.GCT END OF DATA 50.000 0.000 679.350 -1.093 4*684*.54*8 2087.306 10340.645 6159.421 12172.000 7666.279 VDEP.GCT 42.000 HLAZ.GCT E~R.GCT 0o000 CgEL.GCT 679'339 HLAZ.GCT 1.713 CWEL.GCT VI GCT 3823.301 HLAZ.GCT GCT -532.527 CWEL.GCT VD~P'GCT 7636.016 HLAZ.GCT E~DR.GCT -14.04.. 031 CMEL,.GCT VDEPoGCT 8899.350 HLAZ.GCT E#DRoGCT -1561.180 CI, IELoGCT O. 000 0.000 125.691 '0.000 342.335 1.902 34*7.954 1.460 356.617 0.000 ~'~ FILE TRAILER ~t~ FILE NAME : GCT .001 SERVICE : FLIC VERSION : O01AOZ DATE : 89/06/17 MAX REC SIZE : 1096 FILE TYPE : LO LAST FILE : TAPE VERIFICATION LISTING CHLUMBERGER ALASKA COMPUTING CENTER !T-JUN-!989 1,?.: 48 PAGE: **** TAPE TRAILER SERVICE NAME : GCT DATE : 89/06/17 ORIGIN : FLIC TAPE NAME : 73367 CONTINUATION # :, ! PREVIOUS TAPE : COMMENT : GCT~ ARCO L5-36, PRUOHOE BAY/LISBURNE POOL, API #50-029-2!933 **** REEL TRAILER SERVICE NAME :' GCT DATE : 89/06/17 ORIGIN : FLZC REEL NAME : 73367 CONTINUATION # : PREVIOUS REEL COMMENT : GCT9 ARCO L5-36~ PRUDHDE BAY/LISBURNE POOL, API #50-029-2!933 PROGRAM: LISCAN REi¥ISION: 5.1 PART NUMBER: W5790-PE32 Sta~t of e~ecution: ~ed 7 JUN 89 3:07~ **** REEL HEADER **** LIS 89/26/05 ATLAS 01 'LIS CUSTOMER FORMAT TAPE:' **** TAPE HEADER **** LIS 89/26/05 3847 01 "CASED HOLE CN/MS AND SPECTRALOG AT'121'87-11616'~,CN-GR TO CSG AT 11700-4892-'. FILE # 1 MAIN .001 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC MN : L5-36 FN : LIiSBURNE COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 13 CURVES : NAME I GR CODE SAMPLE# UNIT 68 1 API BYTES 4 4 5 6 7 8 9 10 11 1~2 13 CSSN 68 1 LSN 68 1 CLSN 68 1 CN 68 1 CNC 68 1 TH 68 1 U 68 1 K 68 1 ~KTH 68 1 * DATA RECORD DEPTH CSSN TH 12187.000 100.0000 0.0000000 12137.000 364,9927 0.1827014E-01 12087.000 494,5220 0.5276666 12037,000 304.3347 0.6828078 (TYPE# GR LSN U 0.0000000 0.0000000 0.0000000 19.25224 187.6089 1. 400731 ', 20.68576 332.8264 1.968202 29. 25124 129.9994 0.8504349 eTS '~ CTS 4 CTS 4 CTS 4 PCT 4 PCT 4 PPM 4 PPM 4 PCT 4 API 4 1014 BYTES * TTEN CLSN 3000.000 0.0000000 0.0000000 4549.488 46.90222 0. 9689844E-01 4581.820 83.20663 0.4582651E-01 4568.844 32,49985 0.4941978 SPD CN KTH 0.0000000 -15.00000 0.0000000 10.99890 11.39055 5.391880 9.040701 6,142011 1.089908 9,999001 16.04243 23.10138 SSN CNC 100.0000 -15.00000 364.9927 11.39055 494.5220 6.142011 $04,3347 16.04243 11987.000 404.67,99 I .147304 28.36418 216.5310 I .815108 4549.348 54.13275 0. 9369439E-01 9.999001 10.49938 7.893956 404.6799 10.49938 11937.000 273,4531 0.1845595 11887.000 304,4971 0..3920341 11-837.000 335,9082 O. 9227973E-01~ 11787.000 412.7576 0.0000000 11737.000 139.0615 1.504036 11687.000 168,3500 4.849020 1 7. 8923.6 102.1918 0.9103330 19,56836 137.6542 I .143291 15.37268 155.9142 I .020698 15.22744 250.2765 0.8007885 25.66301 29.63651 I · 923096 175.2877 37.63280 8.108017 4580.453 25.54796 0,1760710 4539.520 34.41356 0.1129071 4592.816 38.97856 0.9089899E-01 4588. 039 62.56914 0.6569678E-01 4519.895 7.409125 0.1252519 4450.023 9.408201 ! .113040 9.999001 20.01196 9.893570 10.55700 14.51920~ 7.928909 9.999001 13.84053 4.420804 10.40520 7.974539 0.0000000 9.999001 48.76740 9.260715 10.03470 44.60695 86.40405 273.4531 20.01196 304.4971 14.51920 335.9082 13.84053 412.7576 7.974539 1 39. 0615 48.76740 168.3500 44.60695 6'652194 2.276301 TOTAL DATA RECORDS STARTING TAPE DEPTH **** FILE TRAILER **** O. 51'60352 : 64 = 12187.00 ENDING TAPE 48 · 5'46'1 6 DEPTH = 11619.00 FILE # 2 REPEAT.O02 1024 FILE HEADER **** * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 13 CURVES : NAME COD I GR 68 2 TTEN 68 3 SPD 68 4 SSN 68 5 CSSN 68 6 LSN 68 7 CLSN 68 8 CN 68 9 CNC 68 0 TH 68 I U 68 2 K 68 3 KTH 68 E SA, MP 1 1 1 1 1 1 1 1 1 1 1 1 1 LE# UNIT BYTES API 4 LB 4 F/MM 4 CTS 4 CTS 4 CTS 4 CTS 4 PCT 4 PCT 4 PPM 4 PPM. 4 PCT 4 API 4 * DATA RECORD DEPTH CSSN TH 12184.000 100.0000 0.0000000 12134.000 422.2390 I .218836 12084.000 529.0508 0.0000000 12034.000 O . 2 3 O. (TYPE# O) 1014 BYTES * GR LSN U 0000000 0000000 0000000 39.74223 229.8472 I .495033 0.73973 61.0100 4423770 8.95883 TTEN CLSN 3000.000 0.0000000 0.0000000 4550.980 57.46181 0.585560~ 4608.055 90.25253 0.3940726. 4599.160 SPD CN KTH 0.0000000 -15.00000 0.0000000 8.108400 10.12979 28.66795 9.763201 5.917284 17.55048 10.99890 SSN CNC 100.0000 -15.00000 422.2390 10.12979 529.0508 5.917284 270.9839 11984.000 21.17848 229.3244 69.93240 0.0000000 1.153996 11934.000 16.16736 230.5889 80.19481 '0.0000000 0.6878492 11884.000 14.53349 339.6257 176.9888 0.0000000 0.381731? 4623.891 10.99890 17.4831'1 27.29971 0.2164437 11.36755 4595.547 10.99890 20.04871 22.391 80 0.2018912 10.42035 4574.316 10.99890 44.24719 11 .08063 0.1889683 10.95211 11834. 000 24. 14742 4572. 980 10. 23480 230. 6858 71 · 04941 17.76234 26. 89891 I .055333 I .467609 O. 9700567E-01 8.257738 11784.000 11.80717 4590.4161 9.999001 505.4932 376.6162 94.15405 4.576401 0.0000000 0.6778921 0.9146774E-01 4.428955 11734.000 20.13731 163.2558 41.59200 0.0000000 I .687214 11684.000 177.0358 164.1098 37.81281 6.233527 10.37638 11634.000 107.8210 1 39. 9581 26. 69101 10.88932 3.856465 4523.398 9.999001 10.39800 35.83527 0.1249804 6.321942 4576.887 9.999001 9.453199 42.28003 0.9143631 70.96242 4513.453 9.999001 6.6172750 61.75539 0.6583865 66.98656 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 64 12184.00 ENDING TAPE DEPTH = FILE # 3 **** FILE HEADER **** CN-CSG.O03 1024 229.3244 27.29971 230.5889 22.39180 339.6257 11.08063 230.6858 26.89891 505.4932 4.576401 163.2558 35.83527 164.1098 42.28003 139.9581 61.75539 11616.00 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH ~NIT : FT CURVES : NAME CODE I GR 68 2 TTEN 68 3 SPD 68 4 SS'N 68 5 CSSN 68 SAiMPLE# UNIT I API I LB I F/MM I CTS I CTS BYTES ' 4 4 4 4 4 8 CN 68 I PCT 4 9 CNC 68 1 PCT' 4 * D~TA DEPTH CSSN RECORD (TYPE# GR L SN 1006 BYTES * TTEN CLSN SPD CN SSN CNC 11700.000 224.0058 11650.000 135.8914 11600.000 125.5451 11 550. 000 131.6233 0.0000000 70.49670 140.8907 28.66530 111,0310 21. 06830 74.31764 20.91071 4453.934 17.62418 4479.938 7.166326 4546.797 5.267076 4512.539 5.227675 28.87050 28.24284 28.99710 49.64578 29.65201 75.61255 29.34210 81.91536 224.0058 32.24284 135.8914 53.64578 125.5451 79.61255 131.6233 85.91536 11500.000 121.8070 11450.000 131.6314 11400.000 143.5506 11350.000 156.3708 11300.000 159.1730 85.81541 19.99290 74.94389 22.54410 96.00121 30.43431 92.07616 36.57591 115.4350 36. 21870 4478.617 4.998226 4460.852 5.636024 446;1.711 -7.608576 4402.781 9.143976 4405.832 9.054676 28.99710 83.14697 28.99710 82.46234 28.99710 51.61090 28.9971 0 40.32184 29.99701 43.99939 121.8070 87.14697 131.6314 86.46234 143.5506 55.61090 156.3708 44.32184 159.1730 47.99939 11250.000 144.4234 11200.000 153.8867 11150.000 160.0618 111~00. 000 151.0428 98.89273 29.67110 105.3594 33.26210 89.16560 38.t3791 101.7529 34.11011 4390.105 7.417775 4372.777 8.315525 4340.203 9.534475 4344'844 8.527525 29.99701 53.14717 29.99701 50.09248 29.99701 39.43916 29.99701 47.04877 144.4234 57.14717 153.8867 54.09248 160.0618 43.~+3916 151.0428 51.04,877 11000.000 172.2935 10950.000 176.8772 10900.000 177.5117 10850.000 166.5167 10800,000 146.3156 10750.000 170.8105 10700.000 159.0372 10650.000 149.2446 10600.000 152.7055 10550.000 149.2238 10500.000 142,9953 10450.000 159.8619 10400.000 I 36 · 431 0 10350.000 175.5165 10300,000 168.1572 10250.000 165.2840 76.36024 38.40601 83,73853 46.07741 75.57867 43,96420 '70. 80609 39, 71 870 74.25703 31. 88071 66.20349 41.0283t 73.37860 37,57260 75.77521 36.81970 81.56808 36,77180 57.82430 35,34830 70.46402 30,26700 67.13344 36.74901 70.23970 28,23759 60.48698 42.59.052 55.84613 43.46170 65,92578 38,08551 4284.785 9.601500 4240.410 11.51935 4219.563 10. 99105 4177.195 9.929676 4153.367 7.970176 4157.586 10.25707 4124'.801 9.393150 4100.152 9.204926 4077..633 9.192949 4075.048 8.837074 4036.070 7.566751 4009.782 9.187250 4009.689 7.059401 3977.768 10.64762 3974.388 10.86543 3968.740 9,521376 29.88780 42.84982 29.23289 37.80103 29,23289 36.33250 29.99701 39.56194 29.99701 42.47050 29,88780 37.47543 30.65190 39.06509 29.99701 37.72206 30.23280 40.00447 29.99701 44.25929 29.99701 50.28944 29.99701 42.05289 35.99640 47.17834 35.99640 40.19801 34.88731 35.42610 32.88750 41.87495 172.2935 46.84982 176.8772 41.80101 177.5117 40.33250 166.5167 43.56194 146.3156 46.47052 170.8105 41.47543 159,0372 43.06509 149.2446 41.72206 152.7055 44.00447 149.2238 48.25929 142.9953 54.28944 159.8619 46.05289 136.4310 51.17834 175.5165 44.1 9801 168.1572 39.42610 165.2840 45.87497 10200.000 162.7596 10150.000 155.5925 10100.000 159.7029 10050.000 159.0338 10000.000 1 52. 6802 9950.000 I 58. 5797 9900.O00 154.7193 9850.000 151.7345 9800.000 151.0046 9750.000 158.4661 9700.000 149.5338 9650,000 143.3824 9600.000 157.5233 9550.000 154.4214 9500.000 156.4485 9450.000 161.4561 56.57396 34.93822 61.05716 33.66650 68.88721 36.35110 65.60962 38.22501 62.2?339 34.57269 58.86060 39.79230 64.63644 34.71851 68.23019 33.46201 75.70787 37.74910 73.59280 34.48050 67.13695 36.56371 60.42809 33.33051 50.02803 38.96861 63.75754 38.36790 49.61859 40.69960 54.17227 39.18221 3930.390 8.7'34550 3916.204 8.416624 3903.652 9.087774 3888.735 9.556250 3872.657 8.643175 3964.337 9.948076 3904.543 8.679625 3880.752 8.365501 3876.996 9.437275 3853.384 8.620125 3817.924 9.140924 3800.341 8.332624 3803.1 73 9.742149 3756.426 9.591974 3757.046 10.17490 3734.737 9.795551 31.99680 45.33875 30.99690 47.05989 29.99701 44.07915 30.10620 40.44398 29.99701 43.03200 56.99429 39.22606 59.64900 45.22955 57.99420 42.66936 58.88490 42.39810 58.75832 44.05075 58.99411 42.78166 57.99420 39.92860 58.64911 39.49132 57.99420 36.98376 58.88490 37.50955 57.99420 37.10962 162.7596 49.33875 155.5925 51.05989 159.7029 48.07915 159.0338 44.44398 152.6802 47.03200 158.5797 43.22606 154.7193 49.22955 151.7345 46.66936 151.0046 46.39812 158.4661 48.05075 149.5338 46.78166 143.3824 43.92860 157.5233 43.49132 154.4214 40.983?8 156.4485 41.50955 161.4561 41.10962 9350. 000 56. 46883 3689. 750 59. 99400 I 52.1161 I 52.1161 39. 67880 9.91 9699 38. 581 33 42. 581 33 9300. 000 59.71 236 3647. 097 59 · 99400 1 38 · 5098 138. 5098 30. 347:70 7. 586 926 43. 06891 47. 06891 9250.000 44.94057 3610.432 59.99400 149.7735 149.7735 34.24890 8.562225 40.76308 44.76309 9200.000 46. 97412 3633. 565 59. 99400 139.3672 I 39. 3672 30. 87511 7.718776 45. 87660 49. 87662 91 50. 000 63.08?60 3606. 189 5 9. 88480 I 41 · 4099 I 41. 4099 29. 32491 ?. 3312.24 46. 25735 50. 25735 9100. 000 49.47.668 3581 · 330 59. 88480 148. 411 8 I 48.4118 39.41 501 9.853750 36.77583 40,77583 9050.000 43. 92104 3583.928 59.33911 194.0326 '194.0326 52.81070 13. 20267 31 · 91628 35. 91628 9000. 000 60. 18723 3566.493 5 9. 99400 I 52. 181 4 I 52'. 1814 36. 52071 9.1301 75 40.46263 44. 46263 8950. 000 43.82216 3540. 908 59. 88480 169.1 858 169,1 858 44. 16460 I I · 0411 5 35.1 5572 39.1 5570 8900.000 66,75 647 3524. 269 58.99411 165. 3559 165. 3559 37. 59972 9. 399925 43. 000?6 47. 00076 8850.000 35.35574 3502.858 57.99420 182.2902 182.2902 44.84560 11.21140 ' 38.85675 42.85675 8800.000 39.12265' 3497,351 57.99420 179.1639 179.1639 47.89799 11.97450 33.82442 37.82443 8750.000 53.56726 3435.801 57.64920 156.1699 156.1699 38.33730 9.584324 38.55170 42.55170 8700,000 32.05070 3473.200 64.22940 182.8910 182.8910 48.06561 12.01640 35.71179 39.71179 8650.000 33.38768 3395.510 57.88501 165.4947 165.4947 36.23071 9.057674 42.83162 46.83162 8600. 000 69. 24594 3410. 339 -56. 99429 I 37.21 06 137.2106 31 . 04190 7. 760475 50. 271 62 54. 27162 8550.000 157.4255 8500.000 139.7029 8450.000 136.3058 84OO.OOO 138.0609 8350.000 139.6841 8300,000 151.6620 8250.000 150.1402 8200.000 133.9085 8150,000 1~1 ?. 7440 8100.000 135.0474 8050.000 142.2876 8000.000 135.5311 7950,'000 139.0121 7900.000 163.1491 7850.000 159.6378 7800.000 167.3547 63.88651 28.78700 46.200?'0 27.77361 67.39369 26.61670 55.04222 27.14230 60.00940 30.56322 63.08424 29.84241 57.64964 36. 20340 60,84070 25.91660 61.95132 25.88200 64,30765 26.79021 63.20847 29.57990 58.90208 29.16541 68.60638 28.13370 25.93776 37.67331 40.60324 36.83990 42.59312 38.96980 3407.726 7.196751 3398.663 6.943400 3362.829 6. 6541 75 3352.433 6.785576 3335.451 7.640800 3298.491 7.460601 3277.007 9.050850 3242.696 6.479151 3218.895 6.470501 3223.974 6.697551 3178.665 7.394976 3181,670 ?.291350 3162.994 7.033425 3134.728 9.418325 3120.255 9.2099?4 3104.095 9.742451 60.22980 57.65999 60.22980 52.01405 60.22980 57.04570 59.99400 59.06836 60.22980 49.61066 59.99400 53.95570 59.99400 44.70093 59.99400 52.01161 59.99400 51.29710 59.99400 57.90012 60.10320 48.49518 61.10310 50.03836 59.10330 52.12814 58.99411 41.81285 59.22990 42.45044 59.88480 45.66092 157.4255 61.65999 139.7029 56.01405 136.3058 61.04570 138.0609 63.06836 139.6841 53.61066 151.6620 57.95570 150.1402 48.70093 133.9085 56.01161 117.7440 55.29710 135.0474 61.90012 142.2876 52.49518 135.5311 54.03836 139.0121' 56.12814 163.1491 45.81285 159.6378 46.45044 167.3547 49.66093 7700.000 140.8300 7650.0O0 135.2320 7600.000 137.3827 7550.000 155.2297 7500.000 136.8970 7450.000 156.5724 7400.000 169.7251 7350.000 149.0277 7300.000 130.3259 7250.000 159.8197 7200.000 1.81.3054 7150.000 163.0572 7100.000 159.9001 7050.000 I 48.0755 7000.000 136.4026 6950.000 143.0119 53.76413 27.69211 60.38582 30.15891 66.08522 27.54410 37.95442 36.84801 44'18318 30.89430 50.41800 36.1961.1 46.08638 38.51971 52.18600 32.89211 73.48213 26.77769 50.37715 36.88789 43.06136 41.41760 36.10239 38.15121 21.35460 37.85960 49.00351 32.45401 56.02637 29.86440 50.11584 28.87370 3084.027 6.923025 3022.647 7.539725 3012.937 6.886025 2969.232 9.212000 2945.991 7.723576 2937.701 9.049025 2917.590 9.629925' 2900.095 8.223026 2872.503 6.694426 2859.574 9.221975 2857.749 1"0.35440 2856.888 9.537800 2794.561 9.464901 2796.689 8..113501 2754.109 7.46'6101 2742.624 7.218426 58.99411 51.57265 58.99411 49.56647 58.99411 61.97731 59.22990 41.54456 59.22990 44.88985 59.75819 43.35916 59.10330 48.25769 58.99411 49.07216 59.64900 57.24925'~ 60.99391 40.74831 60.75810 45.56709 60.88470 42.33597 60.99391 40.80176 60.33900 45.35765 60.88470 50.37381 60.75810 52.97186 140.8300 55.57265 135.2320 53.56647 137.3827 65.97731 1~55.2297 45.54454 136.8970 48.88985 156.5724 47.35916 169.7251 52.25769 149.0277 53.07216 130.3259 61.24925 159.8197 44.74832 181.3054 49.56709 163.0572 4'6.335 97 159.9001 44.80176 148.0755 49.35765 136.4026 54.37381 143.0119 56.97186 69OO.OO0 163.2049 6850.00O 143.4533 6800.000 150.4366 6750.000 101.2772 6700.000 129.6520 6650.000 138.9766 6600.000 135.6977 6550.000 1'~58.1,365 6500.000 1.47. 9804 6450.000 1.38.7260 6400.000 154.8675 6350.000 137.8052 6300.000 131.9174 6250.000 143.4021 6200.000 146.0741 6150.000 148.2520 42.53009 38.88170 58.89354 31.49321 33.20105 34.31841 47.40395 17.26720 61.15309 28.97281 54.78212 31.00160 64.12578 28.53120 51.19479 38.97131 63.44057 28.36259 52.60226 29.73160 65.08987 31.39070 59.41594 31.46001 55.45914 28.69211 56.08632 29.52271 39.55193 28.59590 30.93216 34.92850 2730.736 9.720427 2707.956 7.873301 2703.733 8.579599 2682.962 4.316800 2665..355 7.243201 2641..092 7.750401 2621.895 7.132801 2601.784 9.742825 2557.872 7.090651 2555.512 7.432901 2540.772 7.847675 2518.655 7.865001 2504.234 7.173025 2472.454 7.380676 2450.812 7.148976 2446.756 8.732124 60.99391 41.79660 60.99391 51.46413 60.99391 47.84760 60.88470 79.82022 60.88470 50.53830 60.99391 45.94768 60.99391 53.34392 61.30382 42.34454 61.99380 60.89926 62.64870 46.26332 62.22961 55.66759 61.99380 52.47191 62.22961 58.13345 61.99380 49.13274 62.22961 51.67966 62.64870 43.67943 163.2049 45.79660 143.4833 55.46413 150.4366 51.84760 101.2772 83.82022 129.6520 54.53830 138.9766 49.94768 135.6977 57.34392 158.1365 46.34453 147.9804 64.89926 138.7260 50.26334 1 54.8675 59.66759 137.8052 56.47191 131.9174 62.13345 143.4021 53.13274 146.0741 55.67966 148.2520 47.67943 6050.000 135.0~04 6000.000 125.3158 5950.000 138.1945 5900.000 14.8.7913 5850.000 1~50. 7317 5800.000 169.2906 5750.000 166-8659 5700. 000 .139.9457 5650.000 .160.0243 ,_ 5600.000 142.3052 5550.000 141.6896 5500.000 138.7452 5450.000 134.38.21 5400.0'00 142.4280 5350.000 141.9289 5300.000 138.6319 74'61620 25.52391 60.00574 26.88570 59.66'864 27.09410 45.68408 28.85020 33.42819 36.60130 50.51210 43.39520 39.69807 43.17731 54.051'18 31.55220 34.79041 39.07751 63.16699 30.34850 30.3'2698 30.33490 53.46964 30.63071 60.12067 25.98090 68.34869 30.22321 44.42963 30.48291 38.41243 31..92731 2418.292 6.380976 2373.852 6.721426 2366.945 6.773525 2346.769 7.212551 2330.102 9 . 1~50326 2303. 725 10.84880 2267.102 10.79432 2253.465 7.888049 2239.134 9.769375 2236.713 7.587127 2208.919 7.583726 2201.645 7.657676 2168.849 6.495225 2165.317 ?.555800 2148.969 7.620726 2124.936 7,981825 62.10301 61.13972 62.33881 63.14026 57.23010 59.91978 57.75841 51.34117 57.23010 41.12363 57.10350 34.52440 58.75832 36.06580 58.33920 47.68683 58.23001 41.63367 58.75832 49.47900 58.99411 47.03514 58.88490 56.50877 58.23001 58.9.3080 58.10341 44.68782 58.99411 48.00752 58.88490 42.79582 135.0204 65.13972 125.3158 67.14026 138.1945 63.91978 148.7913 55.34117 150.7317 45.12363 169.2906 38.52440 166.8659 40.06580 139.9457 51.68683 160.0243 45.63367 142.3052 53.47900 141.6896 51.03514 138.7452 60.50876 134.3821 62.93080 142.4280 48.68782 141.9289 52.00752 138.6319 46.79582 5250. 000 72~0334'5 21~18~246 58. 23001 135. 3181 1,35.3181 26. 07341 6.518351 59. 60391 63. 60391 5200.000 47- 23822 2107. 298 58.75832 1 35. 8786 I 35.8?86 33. 25351 8.313375 44. 51256 48.51256 5150. 000 5?.95424 2084. 231 58.,88490 124.0101 124.0101 25. 95010 6.48?526 51.31992 55.31 992 5100.000 56.31400 2056. 362 58.64911 120. 1784 I 20. 1784 26' 57251 6.643125 49.17619 53. 1761 9 5050.000 50. 64862 2031 . 135 58. 10341 I 24. 2263 124. 2263 24. 85851' 6. 214625 52. 64868 56.64868 5000. 000 56. 32768 1: 979. 175 5 9. 99400 1 29. 4377 129.4377 28.84981 7.21 2451 47.47630 51 .4?630 4950.000 36.01 085 1955.992 59.99400 136. 4726 136.4726 25. 54930 6.38?325 62.69469 66.69469 4900.000 100.0000 31.18758 0.0000000 1000.000 0.0000000 0.0000000 -4383.000 100.0000 -4374.563 TOTAL DATA RECORDS : STARTING TAPE DEPTH= **** FILE TRA~ILER **** 545 11700.00 ENDING TAPE DEPTH = 4892.00 **** TAPE TRAILER **** LIS 89/26/05 3847 01 TOTAL RECORDS IN THIS LOGICAL TAPE : 686 **.** REEL TRAILER **** LIS' 89/26105 ATL/~S 01 TOTAL RECORDS IN THIS LOGICAL REEL : 687 TOTAL RECORDS IN THIS PHYSICAL REEL: 687 Elapsed exe'~c'u~£on time" = 2 rein'ut'es? 42.0 s-econd~s. S¥S. TEM RET~:RN CODE = 0