Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-033CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:PB Wells Integrity To:Regg, James B (OGC) Cc:Wallace, Chris D (OGC); Oliver Sternicki; Torin Roschinger Subject:OPERABLE: Producer J-29 (PTD #2130330) TIFL Passed Date:Monday, May 13, 2024 5:48:44 AM Mr. Regg, Producer J-29 (PTD #2130330) passed TIFL on 05/12 post gas lift valve change out. The well is now classified as OPERABLE. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Monday, April 29, 2024 5:54 AM To: jim.regg <jim.regg@alaska.gov> Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Torin Roschinger <Torin.Roschinger@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: UNDER EVALUATION: Producer J-29 (PTD #2130330) IA over MOASP, failed TIFL Mr. Regg, Producer J-29 (PTD #2130330) was reported to have anomalous IA casing pressure above MOASP on 04/28/24 after the well was shut-in. A subsequent TIFL failed indicating a failure of a well barrier. The well is now classified as UNDER EVALUATION and is on the 28-day clock for diagnostics. Plan forward: 1. Slickline: Replace SO 2. DHD: TIFL 3. Well Integrity: Additional diagnostics as needed Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:PB Wells Integrity To:Regg, James B (OGC) Cc:Wallace, Chris D (OGC); Oliver Sternicki; Torin Roschinger; PB Wells Integrity Subject:UNDER EVALUATION: Producer J-29 (PTD #2130330) IA over MOASP, failed TIFL Date:Monday, April 29, 2024 5:55:13 AM Attachments:J-29.pdf Mr. Regg, Producer J-29 (PTD #2130330) was reported to have anomalous IA casing pressure above MOASP on 04/28/24 after the well was shut-in. A subsequent TIFL failed indicating a failure of a well barrier. The well is now classified as UNDER EVALUATION and is on the 28-day clock for diagnostics. Plan forward: 1. Slickline: Replace SO 2. DHD: TIFL 3. Well Integrity: Additional diagnostics as needed Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. PBU J-29 PTD 2130330 PBU J-29 (PTD 2130330) TIO Pressures 4/29/2024 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-29 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-033 50-029-23486-00-00 12485 Conductor Surface Intermediate Production Liner 8641 112 2585 10221 2388 10625 20" 9-5/8" 7" 4-1/2" 8878 41 - 153 40 - 2625 38 - 10259 10081 - 12469 41 - 153 40 - 2620 38 - 8576 8416 - 8648 None 520 3090 5410 7500 10625, 12028 1530 5750 7240 8430 10536 - 12157 4-1/2" 12.6# 13Cr85 36 - 10086 8812 - 8791 Structural 4-1/2" HES TNT Perm Packer 9964, 8310 9964 8310 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281 36 - 8420 N/A N/A 237 252 6079 17123 2704 2412 700 700 220 420 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 12:50 pm, Nov 29, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.11.28 17:03:28 -09'00' Torin Roschinger (4662) RBDMS JSB 120523 DSR=12/8/23WCB 3-14-2024 ACTIVITY DATE SUMMARY 11/22/2023 ***WELL S/I ON ARRIVAL*** (ADD PERF W/ 2.875'' GEO RAZOR GUN 6 spf 60DEG) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH RIH W/CH/ 2.75'' GAMMA RAY-CCL/10' OF 2.875'' GUN 6 spf 60 DEG PAHSE MAX OD 3.13'' AOL 23.5' TO ADD PERF'S INTERVAL 10536'-10546' ,CCL TO TOP SHOT 11.3' CCL STOP DEPTH 10524.7' MD LOG CORRELATE TO YJOS GAMMA RAY DTAED JULY-25-2023 JOB COMPLETE ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU J-29 ADD PERF'S INTERVAL 10536'-10546' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-29 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-033 50-029-23486-00-00 12485 Conductor Surface Intermediate Production Liner 8641 112 2585 10221 2388 10625 20" 9-5/8" 7" 4-1/2" 8878 41 - 153 40 - 2625 38 - 10259 10081 - 12469 41 - 153 40 - 2620 38 - 8576 8416 - 8648 None 520 3090 5410 7500 10625, 12028 1530 5750 7240 8430 10546 - 12157 4-1/2" 12.6# 13Cr85 36 - 10086 8820 - 8791 Structural 4-1/2" HES TNT Perm Packer 9964, 8310 9964 8310 Torin Roschinger Operations Manager Josh Stephens josh.stephens@hilcorp.com 907-777-8420 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281 36 - 8420 N/A N/A 221 301 4088 4555 12 1986 350 650 180 180 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:46 am, Sep 13, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.09.13 05:31:30 -08'00' Torin Roschinger (4662) DSR-9/15/23 RBDMS JSB 091423 ACTIVITY DATE SUMMARY 9/2/2023 ***WELL SHUT IN ON ARRIVAL*** PT PCE From 200LP - 3000HP RIH with 1 7/16" Cable head, 1 11/16" Weight Bar (2x) 2" Weight Bar, 1 11/16" GR/CCL, 2.75" Perf Gun (Max Lenth = 34' , Max OD = 2.75") Shooting Depth -= 10,566' - 10,576' , CCL Offset = 7.6' , CCL Stop Depth = 10,558.4' ***WELL LEFT SHUT IN*** Daily Report of Well Operations PBU J-29 Nolan Vlahovich Hilcorp Alaska, LLC Geo Tech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 06/20/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20230420 Well API #PTD #Log Date Log Company Log Type BCU 04RD 50133202390100 219011 5/16/2023 AK E-LINE Perf BCU 04RD 50133202390100 219011 5/17/2023 AK E-LINE Strip Guns NS-23 50029231460000 203050 4/25/2023 HALLIBURTON MFC PBU GNI-02A 50029228510100 206119 5/30/2023 READ Pressure Temperature Survey PBU GNI-03 50029228200000 197189 5/31/2023 READ Pressure Temperature Survey PBU J-29 50029234860000 213033 4/18/2023 BAKER SPN PBU A-06A 50029201180100 223015 4/6/2023 BAKER MRPM Please include current contact information if different from above. T37770 T37770 T37771 T37772 T37773 T37774 T37775 PBU J-29 50029234860000 213033 4/18/2023 BAKER SPN Kayla Junke Digitally signed by Kayla Junke Date: 2023.06.21 13:29:44 -08'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-29 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-033 50-029-23486-00-00 12485 Conductor Surface Intermediate Production Liner 8641 112 2585 10221 2388 10625 20" 9-5/8" 7" 4-1/2" 8878 41 - 153 40 - 2625 38 - 10259 10081 - 12469 41 - 153 40 - 2620 38 - 8576 8416 - 8648 None 520 3090 5410 7500 10625, 12028 1530 5750 7240 8430 10546 - 12157 4-1/2" 12.6# 13Cr85 36 - 10086 8820 - 8791 Structural 4-1/2" HES TNT Perm Packer 9964, 8310 9964 8310 Torin Roschinger Operations Manager Josh Stephens josh.stephens@hilcorp.com 907-777-8420 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281 36 - 8420 N/A N/A 66 859 3326 639 6103 24 1644 832 221 165 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:19 am, Aug 02, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.08.02 10:32:34 -08'00' Torin Roschinger (4662) RBDMS JSB 080323 DSR-8/4/23WCB 3-8-2024 ACTIVITY DATE SUMMARY 7/21/2023 ***WELL S/I ON ARRIVAL*** (Perforating) DRIFT TBG w/ 33' x 3.16" DMY GUNS & 3.70" CENT TO 10700' SLM (no issues) ***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED*** 7/25/2023 *** WELL SI ON ARRIVAL *** INTITAL T/I/O = 900/1000/250 OBJECTIVE: SET 3.5" CIBP AND PERFORATE 2-7/8" 6 SPF 60PHASE HSC RAZOR CHARGES CORRELATED TO SLB PERFORATION RECORD DATED 02-OCT-16 PLUG SET DEPTH 10625.0 FT, CCL OFFSET = 28.3 FT, CCL STOP = 10596.7 FT. 1985/1650 LINE WT, TAGGED. PERFORATION 10546-10556 FT, CCL - TOP SHOT = 9.0 FT, CCL STOP = 10537.0 FT. PRESSURE 700/600 PSI CONFIRMED ALL SHOTS FIRED FINAL T/I/O = 900/1000/250 *** WELL SI ON DEPARTURE, INFORM DSO TO POP *** Daily Report of Well Operations PBU J-29 PERFORATION 10546-10556 FT PLUG SET DEPTH 10625.0 FT Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:213-033 6.50-029-23486-00-00 PRUDHOE BAY, PRUDHOE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12485 12028 8849 9964 None 12028 8310 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 112 20" 41 - 153 41 - 153 1530 520 Surface 2585 9-5/8" 40 - 2625 40 - 2620 5750 3090 Intermediate 10221 7" 38 - 10259 38 - 8576 7240 5410 Production Perforation Depth: Measured depth: 10674 - 12157 feet True vertical depth:8911 - 8791 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr85 36 - 10086 36 - 8420 9964 8310Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Perm Packer Liner 2388 4-1/2" 10081 - 12469 8416 - 8648 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 1921516450181 61033326 1644 789 66 221 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Stechauner, Bernhard Bernhard.Stechauner@bp.com Authorized Name:Stechauner, Bernhard Authorized Title: Authorized Signature with Date:Contact Phone:+1 907 564 4594 Treatment descriptions including volumes used and final pressure: 13. GC2 Lead PE Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8641 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Pull EvoTrieve Plug Operations shutdown … Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 0028281 PBU J-29 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Bernhard Stechauner Digitally signed by Bernhard Stechauner Date: 2020.05.18 10:29:56 -08'00' By Samantha Carlisle at 1:48 pm, May 18, 2020 MGR18MAY20 DSR-5/18/2020 RBDMS HEW 5/20/2020 ACTIVITYDATE SUMMARY 4/16/2020 ***WELL S/I UPON ARRIVAL*** (profile mod) STANDBY DUE TO SIMOPS AS PER PAD OP ***CONT WSR ON 4/17/20*** 4/17/2020 ***CONT WSR FROM 4/16/20*** (profile modification) RAN 3.70" WRP DRIFT, XN LOCATOR, 3.50" LIB. TAG XN-NIPPLE @ 10,032' SLM (36' corr), TAG CLEAN TOP OF EVO @ 10,884' SLM RAN DUAL-SPARTEC GAUGES AS PER PROGRAM (good data) ATTEMPTED TO PULL 4 1/2" EVOTRIEVE FROM 10,920' MD (unable to latch) RAN 10' OF 2.25" PUMP BAILER TO EVOTRIEVE @ 10,920' MD (empty) SECOND ATTEMPT TO LATCH 4 1/2" EVOTRIEVE W/ SAME RESULTS RAN 10' x 2.25" PUMP BAILER, SNORKEL BOTTOM TO 4 1/2" EVO @ 10,884' SLM (metal marks, minimum returns) ***CONT WSR ON 4/18/20*** 4/18/2020 ***CONT WSR FROM 4/17/20*** (profile modification) ATTEMPTED TO PULL 4 1/2" EVO FROM 10,886' SLM (unable to latch) RAN BARBELLED 3.69" CENTS, 1.40" LIB TO EVO @ 10,886' SLM (impression of clean 2 3/8" f.neck) RAN 2.25" PUMP BAILER W/ SNORKEL BOTTOM TO EVOTRIEVE @ 10,920' MD (marks indicate we are stinging into 2 3/8" fishing neck) MULTIPLE RUNS TROUBLESHOOTING ISSUES LATCHING UP, LAST 1.70" LIB RUN INDICATES INSIDE OF FISHING NECK IS TORE UP RAN BAITED BARBELL 3.69" CENT, 2 3/8" SUPER GS, LATCHED EVO @ 10,886' SLM AND MOVED UPHOLE TO 10,250' SLM ***CONT WSR ON 4/19/20*** 4/19/2020 ***CONT WSR FROM 4/18/20*** (profile modification) PULLED 4 1/2" EVOTRIEVE FROM 10,064' SLM (flow cut) ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF STATUS*** Daily Report of Well Operations PBU J-29 RECEIV Z\3- 035 2-7-is o SSW NOV 11 2016 PRINT DISTRIBUTION LIST BAKER HUGHES A t1GCr Please sign and return one copy of this transmittal form to: COMPANY , t r-t4 ifation/Alaska Inc. BP Exploration(Alaska) Inc. Petrotechnical Data Center,LR2-1 DATA LOGGED WELL NAME J-29 900 E.Benson Blvd. \\ AG/201(v Anchorage,Alaska 99508 K BENDEP FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE RPM:PNC3D BHI DISTRICT Alaska --- LOG DATE July 11,2016 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares(c�bakerhughes.com TODAYS DATE November 4,2016 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY FIELD/ FINAL CD/DVD FINAL PRELIM LOGS (las,dlis,PDF,META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BO)) LOGS CGM,Final Surveys) (Compass) PERSON ATTENTION #OF PRINTS- #UI-I'KIN I S _ #OF COPIES #OF COPIES #OF COPIES v 1 4 U 4 1 BP North Slope. 0 0 0 0 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. 0 1 1 0 0 Attn:Ricky Elgarico ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska 0 1 1 I 1 I 0 0 Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 1 1 0 I 0 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** I 0 1 1 0 0 Attn:James Hyun f 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 ***Stamp"confidential"on all material deliver to DNR 6 BP Exploration(Alaska)Inc. 0 I 0 0 0 0 Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. MAY Anchorage,Alaska 99508 SCANNED 2 3 2017 Attn:David Itter TOTALS FOR THIS PAGE: 0 4 4 0 v TOTALS FOR ALL PAGES: 0 4 4 0 0 (1) • w co (NI t r I 1- y c0 ❑ > 3 u o a; E . r� N > a o L 3 a� o +� c wJw • n .0 T „ h �o� p 1 Y 4- v E a) ONW p - CO 4--, 0 w aa)) ao°' t..) o. a C C 0 c I--—.Y cd 4-, (0 ,C ate+ a Q Q J ❑ CO Q � Q ❑ Q co ID cO c� coo CO CO co 'J O 00- m • _ a a Q u) co Q O uj Q v) p p C c 2 • — N — — N "- O O + c N Z Q M N N u -O N 0 +J Q HO C i CC 4, u +' 0 0 _... COCO❑ ❑ ❑ ❑ ❑ ❑ C N N u' U J J J J J J J J J J tia C 47 U O W W W W W W W W W W ,r, N LL LL LL LL LL LL LL LL LL LL , a) a) CU -0 CJ J J J J J J J J J 0_ _o > .0 N U.. Q Q Q Q Q Q Q Q Q Q41 in C 4 "_ = C.- Z Z z Z Z Z Z Z Z Z U CO N 0 t • CU U.. Ll. U. LL LL L LL LLL LL C -0 C > t O .Q E t- E aJ a) U a) C i.-'. O d a a) C _O to w > V Na ,0 ... z G )-a. m a, Y u C c C O L „ _ _ _ X X X c m a o 0 RI r_ u m a) J a) I— t."; Q v a v c a V 10Kt ' LI)W > > > C LL C LL c E c4 C p a, 111 Wre a, O O O J O U fp U C. -I H H F a7 a m ❑ t!) a) 'a EPCS �. O G cc cc CL ce z a z z U A. a a a a rr col 0J Q a' n ) 0 O Ai 00 °� ° 4V 1.1 E — Ot, z O y ,� 0o w o i al p W • v a J J J J O J J J J O LtJ e0X as c - " 3333 � 3333 a) , O ,IrlrfA. L >_ >_, >- >- >- >- >_ >. >_ ` ig Z u, aaaaaaaaaa mmmmmmmmmm .\\.% < 0 0 0 0 0 0 0 0 0 0 - ❑ x x x x x x x x x x J ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ a) ® LL rt ccwwcrzwrxcert Ct. a a a a a a a a aI- o O p�� a G. est O a CO o <- N o 00 0 .. in X n O O N C N O O ,— 0 0 0 0 0 0 •CO CT 0 0 0 0 0 0 0 0 0 0 O Sti O O O OO O co O O co d Q la O Co u x x O N a O x x N Z Z a 0 (J Z ZY @ a1 w ❑ ❑ ❑ ❑ ❑ ❑ U ❑ ❑ ❑ > n G. HI0 z0 4 m o �A = Cr OO O O aO O O O a a a a a a a a a 00 N r O O M V, ch 4-1 To c Q N .a— O NI" O a a0 N CO a0 CO N N V' N M a d' M m N N N N N N N N N N N In C O1 0) O) 0) 0) 0) 0) O) 0) 0) O) C 0 000111 NNNNNNNNNN N O O co O O O O O O O A C aa a a a a a a a a y +'' a) OD c. 4 c U) N U) U) N N U) U) U) U) a -[ m CU CD w OM C Z a) - o c, u, Y Q W d' V) u Ips 9cu cc pyy �� Z �C4p! Q y Z co a !p N O O C N C = a Q O N J 0 3 ❑ m 6 CO p 4 O) E ro ro N Z a) -0 u _ 5 3 O c f0 u in o L '� [ Q co a) c a 0 VD a 4 It a a m . STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations Q Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5Cf V7 1�ol 'V 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 213-033/ f 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-23486-00-00 7. Property Designation(Lease Number): ADL 0028281 8. Well Name and Number: PBU d-Y9 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL RECE1VEr, 11.Present Well Condition Summary: 1 Total Depth: measured 12485 feet Plugs measured 10920/12028 feet DCI 1 7 2016 true vertical 8641 feet Junk measured feet Effective Depth: measured 10920 feet Packer measured 9963 feet AOGCC true vertical 9038 feet Packer true vertical 10091.09 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 112 20"94#H-40 40-152 40-152 1530 520 Surface 2584 9-5/8"40# - L 80 39-2624 39-2619 5750 3090 Intermediate 10221 7"26#L-80 38-10259 38 8576 7240 5410 Production Liner 2388 4-1/2"12.6#13Cr8 10080-12468 8415-8649 8430 7500 Perforation Depth: Measured depth: 10674-10684 feet 11890-11893 feet 11893-11898 feet 11898-11900 feet 12142-12157 feet True vertical depth: 8911 -8918 feet feet 8912-8911 feet 8911-8909 feet 8909-8908 feet 8798-8791 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr85 35-10085 35-8420 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): ®0ED miff R, i f Z' 7 991G4d !�! r �P u� , Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 434 23532 3426 1861 1028 Subsequent to operation: 64 3597 2931 1362 175 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature -- - Phone +1 907 564 4424 Date 10/17/16 Form 10-404 Revised 5/2015 17R r i cl 2-c, Jilo / 4 RBDMS L Original v OCT 1 0 2016 Submit Ori mal Only • 0 Packers and SSV's Attachment PBU J-29 SW Name Type MD TVD Depscription J-29 TBG PACKER 9963.16 8309.26 4-1/2" HES TNT Perm Packer J-29 PACKER 10091.09 8425.2 5" Baker ZXP Top Packer IP 40 a, w a) .c-sw a) a) 3 Ew z w . . o .0 II O n N - 7 Q c T 0 0 w O w a) §. J ❑ O Q - O Q Y I� z Y UJ (DE-0W o22 ao 4 ,� Q c m N M O o 5 (0 w W a. ..4 0 a� m N N O w .- w p V) Q-. U co JO O O 0 CO "O pCC •OM1 N CCV , I 0 Loo co co J O 0U * co3N 00 � y 000 dO � O Y amNQa & 0 � O ami E .-: w ❑ J I- R 7a ,- �_ a) 0 _ 22 N O C7 � m F- N ,� a) � cn rn J o 0 � O .. D 43 CO m O N a) c II to Ti C 2 ooq J N o Q-N. cs O N. < w w ❑ N _ � a o Y60 rnw c to 0 00 _ 0 -1 O > a) J (o I- @< o 0 � NW 2MOM2M Na W O2ZP) = W2 QN J (gyp � 0 "O • NlL , J ZZwr. ma mOV '- U) Wwv F- Z 0 _00 } � Om Z C m I o -O v W Q a) , J• r` . O J Q' P X p O u 2I- c°0o Qa - Edzp la w Q-m < �m II w 000OF- - N m * olio ❑ Wa o2 '0 o m �QJ U) 0m a www ° m iEo ono �= ooz � .. � otsli J ❑ ww0 EL 0 o ❑ ; a0 (n ° Loa na) ac) 00IN -4. m � ❑ 0000 * Eat co _ia NO E v� mctmm Q * co W mQQJ O m a 17,-; wc> � 2cem + - 00 a 03 0 : ~ ~ a) • -1 -1 o (Q') C� Uaco t o > wo * F- Q 3 m *- ^ cnQ U N Z -lo C 0) O - N 2 J * C @-V0 a : m 2 = 0 -2 "0 II > 0 O Z Z Q N o i o 0_coo a' mN am0Dw 4, 0 Q- � � j as 12 � g22UF' cu cp_ c� = mc0 � aa aQ a aaamU W Ea a) � � o OmH � cr° ap ❑ co a) o E� �QQoa Qaao co N ❑ 0 A amu- c Qpm a °� � cooww � rn c1 ° � ° 22O0NW O - I 12z �ev o _ � F- W c 0 > F- 0) a) N ,� a a o ❑ F- Q Q N O V I V a WIZ N N -aw, W W OEC QC') aQ � mZp o4- .Q QOa CLOD ((N01- ~ ❑ "- 27)2 , LL. mzow wmw < w Nr -0 ' z -12 QEF- ogOctZ -00 ,—(225e.,- v) _c >ZNa waaaWz 6 : 0XX mew ZOw ❑ O c a) rn . .§ . 0 II ceaa ❑ ~ 1- � �: UN ❑ ❑ a - ❑ F- OLL = m (A Z2 - 7581--. 1005-27-= ' OF- F- W Z 03 O a) J -- W22 °' QUF- FN WJ or- a) II � Oi- p `" mO 5 V w v- Q m M -1 1- Z Z 4 Q- j -875x " " to x N T.II V J J , w ' N _Z Q m ate . . 00 O . x wQ � - _ m - � ZUaoZZm0UUF- C/, � .00 -YOJJ Z - OOOOa0 > o Q < 0o< QcCa * * wcc * * M .Q- m : aN >4 ~ ❑ N- QOOW � 7' v• W * a' J .- d' CL J a I' r, m J : x co w _6 F- Q m I Z a' (V I- J J m Q r, W F- 0 co m (o (O (O C0 0 0 0CNI 0 0 0 5 CO co ti N- a) N 0 O O) a) cm Q • • • w II II m Z o 0 O II Lu 0 L" a 0UJ N O I- LL 2 0 ¢ Co.ui a z w a O 03 m 0 a o ocomLo U0 II 00000 < 0 Om W 0 N 0 0 0 N m O < O O NO NO �O Lu 0 0 OJ ¢ o 0 0 ¢ 1O 0 a ' ' ' ' w w 0 a 0 co 0 0b 0 � J o 0 0 o a � N c a o 0 0 v ---. c0 a -1 o 0 0 0 cc U 2 0 c� a u n 0 d' a _W T- T- T- % v Ct _ u 0 0 Z < p00 ¢cco QOON 2 � 2mmo � Nic� O I = W 0 � u_u_ ' wall wall a a w ° ix W 0000N ZONv) I- J a C - W p00J 0WZ7 z WWWW ? Zh it a 0 L LLJ J 000 -1 ap0N- J m 0000 -(0000 000 M O m Z Z Z , 9 c621-70 U W m U Z Z Z Z w LU m 0 O N cn X W W W 2 d 0 W J U Z W W W ~ J W � J N Co 0 c� * z C� OOa WO co - 000a «n--J zao N 75 C7 ZO a } >- ›- Ce a l- 0 -) o m _000 W HQ J * co a uj XO� * iopcmc�)• ? OW v .r- Ma J 000 OWO W mN W W ZZZI�icoN1- 0No 00 o t• aW U mCIO WoRI w cnmmm -1NHOu ' WD NI- 0. m 0 0000 UOmS0 . a U¢' < -4‹ c) OWQo 800' " 2E53a ZZZa mZoop ; oa z0UU0 � N � Oo 00 ¢O O N H a N 0 N — Z Z a M O J 43 _1 ¢ M LACI- dW W t wLLc0IOU- oa U- aaa10Li- 0 II > am 12 H 0 WoW NNN2 pcOQZODaoa � NNNZ00 W ¢ W -1 (/) ; ¢ « rn1- 1- 1- Ce aOWWO OWWU) 0I- 0 I ZW Zia. ¢ ¢ -1Cl WZZ � D _ QQQQWZZ WIZ vU) 0 " - w n fnmm � QwDI- - - " Z - �) cnc, COH - - � a0 -10 -� Z p � U) U U) J Cl) O m Z O F U U U U U H I O U W a U O O a 0 - = aaa = OaN � 00 _ � i� aaa < W00wco ! . ozzop -1 aaa � Oa c,, VDaaaac00010 r� Hw - WU m ¢ _ N � 0 ? ammQNO » » ¢ mmriw0oizWW m = 2 MOO z U W o W - O O Z O r- U) z M 0 CL CL u) m 00 - Z 0 z a l'-;1- H J = = W o W '011 p 0p ; + W N (NI N ¢ ! r § N M � ¢ s i a' a s r f- aF-' a CD to O O ON Z3 N N ,- N ch O O CD T- O T- • S N c � O E L 3 fl. a. (0I— O _ 5 ris c`.1 �- w � O m to O a. a as0 0 c N Co -c a 5 2 0 N co m � N TREE= 4-1/16'CNV . SAFETY NOTES:WELL ANGLE<70 WELLHEAD•- FMC 11"5M J _z 9 4-1/2"CHROME TBG&PROD LNR**�10944'"*' ACTUATOR= BAKER C NTIAL KB.H.E 77.07' 1 BF.BEV= 36.5' L 1 KOP= 2948' 510' -19-5/8"TAM FORT COLLAR,ID=8.835" Max Angle= 118°@11816' / Datum MD= 10623' Datum TVD= 8800'SS ' ' I 2013' H4-1/2"FES X NP,D=3.813" 20"CONDUCTOR,131.45#,X-56, D=?r -I -114 9-5/8"CSG,40#,L-80 BTC,D=8.835" H 2625' ' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3533 3514 19 KBG2 DOt E BK 16 08/02/15 Minimum ID =3.726" @ 10068' 4 5562 4990 56 KBG2 CMY BK 0 02/03/15 3 7714 6302 35 KBG2 SO BK 20 08/02115 4-1/2" HES XN NIPPLE 2 8828 7289 27 KBG2 LMY BK 0 08/10/13 1 9859 8214 24 KBG2 DIY BK 0 08/10/13 I 9935' H4-1/2-HES X NP,D=3.813" Z X 9964' H 7"X 4-1/2"HES TNT FKR,D=3.856" I I 9999' -14-1/2"HES X NP,D=3.813" I I 1 10068' H4-1/2"HES XN NP,D=3.725" TOP OF 4-1/2"LNR - 10081' 4-1/2"TBG,12.6#,13CR-85 VAM TOP, -f 10086' / 10081' -{7"X 5'BKR HRD E ZXP LTP,D=4..32" .0152 bpf,13=3.958" 10086' -14-12"WLEG,N)=3.958" 10103' 1-17"X 5"BKR FLEX-LOCK LNR HGR,D=4.32" 10113' -15"X4-1/2"XO,D=3.870" 7"CSG,26#,L-$0 VAM TOP HC, 10259' I • , 10118'J -Ia 1/2"PUPJOINT w/RA TAG i .0383 bp,D=6.276" PERFORATION SUMMARY UDO"'"0111 10920' 4-112'E VO L__. -J-{ _ TRE1/E PLUG(09/27/,6) ) REF LOG: ANGLE AT TOP PERF: 50°@ 10674' • ( 11396' �-�4-12"PUP DONT w t RA TAG Note:Refer to Production DB for historical pert data i SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 2" 6 10674-10684 0 10/03/16 2-7/8" 6 11890-11900 C 12/02113 2-7/8" 6 11893-11898 C 10/14/13 2-7/8" 6 12142-12157 C 06/17/14 1110-41111112028'CTM 4-112"WFD SPECIAL UCLEARANCE WFD(06/01/15) PBTD -{ 12394' I .'Y,YAVA.,. 4-1/2"LNR, 12.6#,13CR VAM TOP, - 12469' V��� . .� .0152 bpf,D=3.958" DATE REV BY COM0EYTS DATE REV BY COMMENTS PRUDHOE BAY MT 08/11/13 D-25 IMTIAL COMPLETION 09/28/16 CJWJMD SET EVOTREVE PLUG(0927/16) WELL J-29 12/10/13 RIvIYJMD ADPERF(12/02/13) 10/03/16 JUJMD ADPERFS(10103/16) PERIufT No:"2130330 06/18/14 RM-VJMD ADFERF(06/17/14) 10/13/16 BO/JMD COR FECTB)PERMT NUMBER AB No: 50-029-23486-00 02/05/15 SWC/JMC GLV C/O(02/03/15) SEC 9,TIN R13E,801'FNL&1951'FEL 06/01/15 FA/PJC SET SPECIAL CLEARANCE WRP 08/13/15 SJW/JMD GLV C/O(08/02115) BP Exploration(Alaska) te) MC•I v o v pLf) CO o ¢ m u Y LU C7 O Y - > M u LI al Z r 0 w X 00 a s co �� Lfl . Jam .. 0 O_ v, r, ID 0 N Nco ¢rY • z C y H T O at �c O a o CO c o _o 0 n c o > a Q LLl- N in N In in e- N in ,_ ,_ in In In c▪0 O_c uN L m l7 ! C C C T 7 7 >, T T 7 7 a'' aJ O y N to 0 Q. C C > > C co C C c0 co ccs C C , • t C C ro to N N N N r h N N In 4 EC T > C @ CU Q a1 Ou v O ✓ N > -C"-' 0 y 000000 000000000 co a▪ u.) C L Cr • - LLJ; J J J J J J J J J J J J J J J M11.111111111111.111111.111.111111.111.1} W 11.111.11/1 4-, 0 o ).: LL LL LL LL LL LL LL U. LL u.. LL. LL LL LL LL 7 0) E -O v, Q: J J J J J J J J J J J J J J J O c CrQ Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 0 ,. (0 Z 0) a Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z u v, ^ -a ` 0 O) , LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL a) C - u E 'Eli cc w co • ra U• v s O Y al > Y `) E a; ate, o 0 p at Z z v, - o0 V %. 0 O v tOOOOO O v a) .FE 47- ,,—. r 0 n. 0 0 0 0 0 O a g C r0 o '� cid V u1- 00000, ❑ O Z F H < v s u > m q` ) 0 0 0 0 0 O LL O Q' > > J O Js a' CO CO CO CO CO m J �' F d a U -9 a �i pp r H r !- F- H a !n �p U G m v' z z z z z Z O o 'n m a a - 0 y a2 W W W W W W U w W W w w W I v > PI U 'il 1 00000 0 Ct. a W V a) p_ 0 ri ( O0 � to o r - r r r r >- ).- >- p,. 0000000Ore" ..> — aJOOOOO OOOO i es J J J JJ asaoC z co cc 22 2 2 2 2 2 2 2 2 2 IL v W W W W W W W W W v) 2 2 2 ea 2 2 2 2 2 2 2 r ir et r r r r r r r r r r r Q Q Q Q a Q Q Q Q Q a Q Q Q Q E! mmmmmmmmmmmmmmm N ¢{ W W W W W W W W W W W W W W W Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 D0D0000D0 t_ n ,J ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ v Q' a' Q' Q' d' Q'1-440000D0 d' d' 2 Q' R' 2 Q' Q' 2' O. a a a a a a a a a a a a a a c III ' In .j //++ U) co M h ct IA cD COA* C) a) 03 cD Or X In 0 0 0 N. 0 O CO 00 CO N CO O 0 O O O 0 O O O <V 0 0 0 0 0 0 0 0 0 0 0 0 p 0 0 O I!) fi) ") W 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 _ C1 Ii tJ ❑ 2 ❑ 2 2 U S 6 2 ❑ N U N M •Ic O) 5 U co cn co co co co cn (n co U m � m - E Q CU U U U U U U U U U U U U U U U 6! fa on ill ' i_ x a o Ce p In o o O r- 0 0 0 0 m u t.09 O O 0 0 0 0 0 0 0 0 0 0 0 0 1- lD W N cD V c0 OO O O co O Oo a a}} O O In Nr Cr CO 0 In M M N In CO I? O M n In cD V V C) .- K) In In C) c- f9 - N. O r- N 0 0 M r- N Cl M N 0 0 ' > IN N N N N N N NO/ N N NC,/ N NN Fp . C) 0) C) C) Oa) C) C) C) C) C) C) C) C) C) E C p N N N N N N N N N N N N N N N N O 01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C v, O O O O O O O O O O O O O O O CD C In In In to In In co co In In In If) IA N N - CO _.. 03 C 4-4 C. 'n w = � g et in E u 5 E o �i a) 00 o rn ,• W Y g cr •� u a m ❑_ -ti v Tr 0 BD Iv) O M M M N N N V M O N E CO CC D ) J • a ..... N o 0 o m O a v) o z a) -0 Q t c o 8 y E F- a` a. Oop STATE OF ALASKA ' \LASKA OIL AND GAS CONSERVATION COMMI: A - REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Appr ved Program o Plug for Rednll 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other kirk'P \ ' 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 213-033 3 Address: P.O Box 196612 Anchorage, Development m Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6 API Number: 50-029-23486-00-00 7 Property Designation(Lease Number): ADL 0028281 8. Well Name and Number: PBU J-29 9. Logs(List logs and submit electronic and printed data per 20AAC25.071)• 10. Field/Pools: PRUDHOE BAY.PRUDHOE OIL 11 Present Well Condition Summary: RECEIVED Total Depth: measured 12485 feet Plugs measured 12028 feet true vertical 8641 feet Junk measured feet JUN 3 0 2015 Effective Depth: measured 12028 feet Packer measured See Attachment feet true vertical 8849 feet Packer true vertical See Attachment feet AO 0 C C Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 112 20"94#H-40 41 -153 41-153 1530 520 Surface 2584 9-5/8"40#L-80 41 -2625 41 -2620 5750 3090 Intermediate Production 10221 7"26#L-80 38-10259 38-8576 7240 5410 Liner 2388 4-1/2"12.6#13Cr8 10081 -12469 8416-8648 8430 7500 Perforation Depth: Measured depth: 11890-11893 feet 11893-11898 feet 11898-11900 feet 12142-12157 feet 8911-8909 feet 8909-8908 feet 8798-8791 feet True vertical depth: 8912-8911 feet See 4-1/2"12.6#1 36-10086 36-8420 Tubing(size,grade,measured and true vertical depth) Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNE® ; ' O,:) Treatment descriptions including volumes used and final pressure: - 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 834 40148 2184 0 1161 Subsequent to operation: 0 0 0 0 0 14.Attachments:(required per 20 AAC 25 070 25 071,a 25 283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development m Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O Exempt: Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature jjaet.Alp, C, Phone +1 907 564 4424 Date 6/30/15 Form 10-404 Revised 5/2015 v-TL W l / A Mr-- '`BDISI oriinal - 1 2015 Packers and SSV's Attachment 213-033 SW Name Type MD TVD Depscription J-29 PACKER 9963.54 8309.61 4-1/2" HES TNT Perm Packer J-29 PACKER 10080.93 8416.02 5" Baker ZXP Top Packer (N . 2 Fa - 0' KI_ % CDCICC -c 2 $� k OCG % 2 2 q = a &0_ / ca_ CD kk • (N ƒ / 7k a � fp @dc" co /_10- a 7 ° CI) ( . E A a- c » k a ® E RI < Y \ = 6 E a L. k / 2 � / � @ 2 / oa @ O \ 2 ( 70 � qI � = 2 � � � aw 3 � � E @ 2 c o c 4- el 2 ® - 2 t � � f o ° Q — m • re / � � k ƒ > 2N \ � ca 0 I- - + 0 ? D i-ƒ w 2 a) § U | 2 / > S E 2 % f o / @ $ a / E Q c C a) 1 — � pDc . E / @ \ cb » co B m o I » co � � / k �f = 2 � _ : > _ _ - n ° e = o % G b a 2 \ / I Q O M o ¥ m i to u \ in / / C2k > R Co 0 WELLHEAD= FMC 11"'5M1 J -2 9 (4-112" HR ME TBG&PN PROD UR*** 10944'*** ACTUATOR= BAKER C INTBF. EL KB.ELLE 77.07' I L I BF. ELEV= 36.5' KOP= 2948' 510' H9-5/8"TAM PORT COLLAR D=8.835" Max Angle= 118°@11816' Datum MD= 10623' / I Datum TVD= 8800'SS 1 2013' –14-1/2"FES X NP,D=3.813" 20"CONDUCTOR,131.45#,X-56, D=??" H –114 9-5/8"CSG,40#,L-80 BTC,D=8.835" –{ 2625' , GAS LFT MANDRI:LS ST M) ND DEV TYPE VLV LATCH FORT DATE '---0-- 5 3533 3514 19 KBG2 DOME BK 16 09/29/13 4 5562 4990 56 KBG2 DMY BK 0 02/03/15 Minimum ID = 3.726" @ 10068' 3 7714 6302 35 KBG2 DMY BK 0 08/10/13 4-1/2" HES XN NIPPLE 2 8828 7289 27 KBG2 DMY BK 0 08/10/13 1 9859 8214 24 KBG2 DMY 1 BK 0 08/10/13 I ' 9936' –14-1/2"HES X NP,D=3.813" Z 9964' –1 7"X 4-1/2"HES TNT PKR,D=3.856" I ' 9999' H4-1/2"HES X NP,D=3.813' I I 10068' –14-1/2"HES XN NP,D=3.725" TOP OF 4-1/2"LNR H 10081' 1 — 4-1/2'TBG, 12.6#,13CR-85 VAM TOP, 10086' / 10081' H 7"X 5'BKR HRD-E ZXP LTP,D=4..32" .0152 bpf,ID=3.958" 10086' –14-112"WLEG,13=3.958" 10103' –17"X 5"BKR FLEX-LOCK LNR HGR,D=4.32' 10113' H5"X4-112"XO,D=3.870" 7"CSG,26#,L-80 VAM TOP HC, —1 10259' , .0383 bp,D=6.276" I H 10118' –14-1r2"PUP JONT w/RA TAG PERFORATION S11JV RY REF LOG: ANGLE AT TOP PERF: 117°@ 11890' Note:Refer to Roduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 2-7/8" 6 11890-11900 0 12/02/13 = 11396' –{4-1/2"PUP JOINT w/RA TAG 2-7/8" 6 11893-11898 0 10/14/13 2-7/8" 6 12142-12157 C 06/17/14 01w–w1111112028'CTM –4-1/2"WFD SPECIAL CLEARANCE WFD(06/01/15) , U PSTD H 12394' OW 4-1/2"LW, 12.6#,13CR VAM TOP, 12469' A-A.A.ASAI • .0152bpf,83=3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/11/13 D-25 INTIAL COMPLETION 12/10/13 RfMWJMD ADPURF(12/02113) WE L: J-29 08/19/13 PJC DREG HO CORRECTIONS 06/18/14 F&YJMD ADPERF(06/17/14) PERMIT No:"20130330 08/24/13 JT/PJC BF,WELLHEAD LPDATE 02/05/15 SWCiJMC GLV C/O(02/03/15) API No: 50-029-23486-00 10/09/13 JLS/JMD GLV C/O(09/29/13) 06/01/15 FA/PJC SET SPECIAL CLEARANCE WRP SEC 9,T1 N,R13E,801'FNL&1951'FR. 10/13/13 JT/PJC FINAL ODE APFROVAL 10/21/13 JDMJMD PEWS(10/14/13) BP Exploration(Alaska) Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Thursday, February 05, 2015 8:59 AM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead;AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Wireline Operations Team Lead;AK, D&C Well Services Operations Team Lead;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr;AK, OPS Well Pad RJ; Cinelli, Steven;Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Well Integrity Coordinator;AK, OPS FF Well Ops Comp Rep;AK, D&C Projects Well Integrity Engineer; Regg,James B (DOA); Sternicki, Oliver R Subject: OPERABLE: Producer J-29 (PTD #2130330) TIFL Passed Attachments: image001 jpg; image002.png All, Producer 1-29 (PTD#2130330) passed a TIFL on 02/04/2015 after wireline work was completed. The passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. • Well status is Operable • A SSSV is not required Thank you, FEBsamet3 0 6LOVh Kevin Parks (Alternate Law rie Clover) BP Alaska-Well Integrity Coordinator G'11V Global Wells Organization Office: 907.659.5102 WIC Email:AKDCWeIlIntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Monday, January 26, 2015 8:28 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M IL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad RJ; Cinelli, Steven; 'chris.wallace@alaska.gov'; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R Subject: UNDER EVALUATION: Producer J-29 (PTD #2130330) IAP exceeded MOASP All, Producer J-29 (PTD#2130330) inner annulus pressure exceeded MOASP on January 23, 2015 with T/I/O= 2020/2270/260 psi.A subsequent TIFL failed, indicating a lack of competent barriers downhole.The well has been reclassified as Under Evaluation to facilitate diagnostics. Plan Forward: 1. Slickline: Change-out OGLV 2. DHD: Re-TIFL 3. WIE:Additional diagnostics as needed A copy of the wellbore schematic and TIO plot have been included for reference. Please call with any questions. Thank you, Laurie Climer (Alternate:Jack Disbrow) /BPP Alaska-Well Integrity Coordinator GWY G.o al Webs Y Organizaton WIC Office: 907.659.5102 WIC Email: AKDCWeIIIntegrityCoordinator@BP.com 2 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. 3 - Q 3 Well History File Identifier Organizing(done) ❑ Two-sided ❑ Rescan Needed RES AN: OVERSIZED: NOTES: Color Items: ❑ Maps: 'rayscale Items: logs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Date: / /c /s/ 19 Project Proofing BY: ECP Date: / dag 1st I, I Scanning Preparation 3 x 30 = 9 o 14- = TOTAL PAGES i d (Count does not include cover sheet) BY: Maria Date: ' fri/S /s/ Production Scanning C Stage 1 Page Count from Scanned File: I DJ (Count does include cover sheet) Page Count Matches Number in Scanning Pr paration: �ES NO BY: Date: //015 /s/ Stage 1 If NO in stage 1, page(s)discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Monday,January 26, 2015 8:28 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead;AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Wireline Operations Team Lead;AK, D&C Well Services Operations Team Lead;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr;AK, OPS Well Pad RJ; Cinelli, Steven;Wallace, Chris D (DOA); Regg,James B (DOA) Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R Subject: UNDER EVALUATION: Producer J-29 (PTD#2130330)IAP exceeded MOASP Attachments: image001 jpg;J-29 Wellbore Schematic.pdf;J-29 110 Plot 1-26-14.docx All, Producer J-29 (PTD#2130330) inner annulus pressure exceeded MOASP on January 23, 2015 with T/I/O= 2020/2270/260 psi.A subsequent TIFL failed, indicating a lack of competent barriers downhole.The well has been reclassified as Under Evaluation to facilitate diagnostics. Plan Forward: 1. Slickline: Change-out OGLV 2. DHD: Re-TIFL 3. WIE:Additional diagnostics as needed A copy of the wellbore schematic and TIO plot have been included for reference. Please call with any questions. Thank you, Laurie Climer (Alternate:Jack Disbrow) BP Alaska-Well Integrity Coordinator G'tAl GV)elWel Is V V Organaat:on WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com 1 • Producer J-29(PTD#2130330) TIO Plot 01/26/15 WP Jdf a. 3. W4 On • 11.1ll4 11%&4 111514 11,2214 112904 1211514 121114 12,2014 122'14 0101115 0121115 01211115 0194'15 TIS= 4-1/16"CM/ SAR DTES:WELL ANGLE<70"@ 10944"" WELLHEAD= FMC 11"5M ACTUATOR= BAKER C J _2 9 4-1/2"CHROME TBG& PROD LNR•'" INITAL BF EL KB.R F 735' I BF.ELEV= 36.6.5' KOP= 2948' 510' —(9-5/8'TAM IRT COLLAR ID=8.835" Max Angie= 118°@11816' Datum MD= 10623' Datum TVD= 8800'SS ' 2013' H4-1/2"HES XNP,D=3.813" 20"CONDUCTOR, 131.45#,X-56, ID=??" —114 9-5/8"CSG,40#,L-80 BTC,ID=8.835" --{ 2625' I GAS LIFT MANDRELS ST MD DEV TYPE VLV LATCH FORT DATE 5 3533 3514 19 KBG2 DOME BK 16 09/29/13 4 5562 4990 56 KBG2 SO BK 20 09/29/13 Minimum ID = 3.725" 10068' 3 7714 6302 35 KBG2 DMY BK 0 08/10/13 4-1/2" HES XN NIPPLE 2 8828 7289 27 KBG2 OMY BK 0 08/10/13 1 9859 8214 24 KBG2 DMY BK 0 08/10/13 9935' —{4-112"HES X NP,D=3.813" 9964' _(7"X 4-1/2"HES TNT PKR,ID=3.856" 9999' —14-1/2"I-ES X NP,D=3.813" 10068' H4-1/2"HES XN NIP,D=3.725' TOP OF 4-1/2"LNR —{ 10081' 1--- 4-112"TBG, 12.6#,13CR-85 VAM TOP, --{ 10086' / \ 10081' —17"X 5"BKR HRaE ZXP LTP,D=4..32" .0152 bpf,D=3.958" 10086' —{4-1/2"WLEG,ID=3.958" 10103' —17"X 5"BKR FLEX-LOCK LNR HGR,D=4.32" 10113' —15'X 4-1/2'XO,ID=3.870" 7"CSG,26#,L-80 VAM TOP HC, -( 10259' • .0383 bp,ID=6.276" PERFORATION SUMMARY = 10118' H4-1/2"RJPJOINT w/RA TAG REF LOG: ANGLE AT TOP FERE: 117°@ 11890' Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2-7/8" 6 11890-11900 0 12/02/13 11396' H4-1/2"PUP JOINT w/RA TAG 2-7/8" 6 11893-11898 0 10/14/13 2-7/8" 6 12142-12157 0 06/17/14 PBTD —{ 12394' 4-1/2"LNR, 12.6#,13CR VAM TOP, — 12469' I���1����� .0152 bpf,ID=3.958' '1 AvA A A• DATE REV BY COMMENTS . DATE REV BY COMMENTS PRt1DHOEBAY UNfT 08/11/13 D-25 IMTIAL COMPLETION 12/10/13 RMWJMD ADPERF(12/02/13) WELL: J-29 08/19/13 PJC DRLG I10 CORRECTIONS 06/18/14 RMFUJMD ADPERF(06/17/14) PERMIT No: 20130330 08/24/13 JT/PJC BF,WELLHEAD UPDATE API No: 50-029-23486-00 10/09/13 JLS/JMD GLV C/O(09/29/13) SEC 9,TIN,R13E,801'FNL&1951'FEL 10/13/13 JT/PJC FINAL ODE APPROVAL 10/21/13 JDMJMD PERES(10/14/13) BP Exploration(Alaska) STATE OF ALASKA ALAI DIL AND GAS CONSERVATION COMMIS: a REPOK f OF SUNDRY WELL OPERATIuNS 1 Operations Abandon U Repair Well❑ Plug Perforations LJ Perforate U Other LI Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work. 5 Permit to Drill Number Name: BP Exploration(Alaska),Inc Developmert0 Exploratory ❑ 213-033-0 i 3.Address P O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-23486-00-00 7.Property Designation(Lease Number). 8.Well Name and Number ADL0028281 PBU J-29 9.Logs(List logs and submit electronic and pnnted data per 20AAC25.071) 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary. Total Depth measured 12485 feet Plugs measured None t I V E D true vertical 8640.68 feet Junk measured None feet JUL. 29 2014 Effective Depth measured 12394 feet Packer measured See Attachment feet true vertical 8683.2 feet true vertical See Attachment feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 80 20"94#H-40 41-121 41-121 1530 520 Surface 2584 9-5/8"40#L-80 41-2625 41-2620 61 5750 3090 Intermediate None None None None None None Production 10221 7"26#L-80 38-10259 38-8576 22 7240 5410 Liner 2366 4-1/2"12 6#13Cr80 10103-12469 8435.91 -8648.18 8430 7500 Perforation depth Measured depth 11890-11893 feet 11893-11898 feet 11898-11900 feet 12142-12157 feet True Vertical depth 8912 43-8911.08 feet 8911 08-8908.85 feet 8908.85-8907 96 feet 8797.92-8791 21 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary: Intervals treated(measured) Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation. 487 16277 2706 880 971 Subsequent to operation: 829 43748 1700 0 1071 14 Attachments 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work. Oil Q Gas H WDSPL❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ H SUSP ❑ SPLUCC 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C O.Exempt N/A Contact Nita Summerhays Email Nita.Summerhaysabp.com Pnnted Name Nita Summ- a . Title Petrotechnical Data Engineer Signa. -����j �,,.„.„ _ _ _ . a���_ Phone 564-4035 Date 7/29/2014 — 1/1F. 7/y//- 1L}- RPr MS JUL 3 0 2016k ' Form 10-404 Revised 10/2012 A �` 'rX/ Submit Original Only Daily Report of Well Operations ADL0028281 w . . cope; in", ewe ry og, •• 'e s MIRU. RIH w/Drift/Jewelry Log BHA(GR/CCL in 2-7/8"carrier, 3.38"JSN). Tag PBTD at 12381' CTM. Log up at 45 fpm. Paint coil flag at 12006.8'. Log up to 9800'. POOH. Downloaded good log data. +14.5' correction to tie-in log. RIH w/ 15' of 2.88"2906 PJ Omega HMX Perf Gun. perforate 12142- 12157 interval. pooh. all shots fired, recovered ball. Well freeze protected with 38 bbls of 50/50 McOH. 6/17/2014 **job complete** Rig down continued on WSR 06-18-14 6/18/2014 plalirMaiffiTIVATRI C 0131 • FLUIDS PUMPED BBLS 247 I% SLICK KCL W/SAFELUBE 35 50/50 METH 282 TOTAL Q o 0 0 0 0 0 0 11- " S moo v o Ln Ln Ln 7, 14) r-- O OtiU Z o o 0 0 0 = o L C) M Ln N m C`') m = O I` O O) CO o0 (3,2N-C1 (.730 (1) (13 (1) O r- � a7 N O O O O N m m o666 N N N - O cC O O O O O W M CO N • l l l l l III H '-- N O) •- x- 11-j 4 C0 — O O O M M M M M M MM a) mco CD C CO O O COO CO CO N N N 0 0 0 L N O O co0 0 0 • CO• 2C.) Q N m = 00 � 0000 � COOCO (V O c M, rM M M CO M O I— 0 0 In �t It • Q �o O ao ao ao 000 1- M O M M M O i Q O CO N * 0* CDCOocc • in g N O) O _ N N N ✓ _ r- ct Eo � � � N N in N N N 000 Q?O C0 NIUIOIO C O M N O O O y cV N 0 0 0 r rx—r- 0 Z O (3)Hco .N w QOOCJ 0 J 0 Z Z Z Packers and SSV's Attachment ADL0028281 SW Name Type MD TVD Depscription J-29 PACKER 9964 8232.95 4-1/2" HES TNT Perm Packer J-29 PACKER 10081 8339.01 5" Baker ZXP Top Packer TREE= f. 4-1/16"CMV SAFET TES:W ELL ANGLE<70°@ 10944'*** AD= FMC 11"5M ACTUATOR= BAKER C J -29 _29 4-1/2" JME TBG&PROD LNR*** ACTUATOR MIAL KB.ELE 77.07' I BF.EEV= 36.5' KOP= 2948' 510' H9-5/8"TAM FORT COLLAR D=8.835" Max Angle= 118°©11816' Datum ASD= 10623' Datum TVD= MOO SS — NEM t ' 2013' —44-112"Fcs X Pp,D=3.813" 20"COhOUCTOR,131.45#,X-56, ID=rr 9-5/8"CSG,40#,L-80 BTC,D=8.835" —4 2625' ' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3533 3514 19 KBG2 DOME BK 16 09/29/13 4 5562 4990 56 KBG2 SO BK 20 09/29/13 Minimum ID = 3.725" @ 10068' 3 7714 6302 35 KBG2 DMY BK 0 08/10/13 4-1/2" HES XN NIPPLE 2 8828 7289 27 KBG2 DAY BK 0 08/10/13 1 9859 8214 24 KBG2 DMY BK 0 08/10/13 9935' H 4-1/2"HES X NP,D=3.813" 9964' Hi-X 4-1/2"HES TNT PCR,D=3.856' 9999' -74-1/2"FES X NP,D=3.813" 10068' —4-1/2"FES XN NF D=3.725" TOP OF 4-1/2"LNR H 10081' 1--- 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, —{ 10086' / 10081' -j7"X 5"BKR HRDEZXPLW,D=4._32" .0152 bpf,D=3.958' 10086' —14-1/2"INLEG,D=3.958' 10103' J—7"X 5"BKR FLEX-LOCK LNR FDR,D=4.32" 10113' —5X4-112'XO,D=3.870" 7"CSG,26#,L-80 VAM TOP HC, H 10259' .0383 bp,D=6.276" FBRFORATION SLMAARY = 10118' H4-1/2"PLR JONT w/RA TAG REF LOG: ANGLE AT TOP PERF: 117"@ 11890' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 2-7/8" 6 11890-11900 0 12/02/13 11396' —4-112"PUP JOINT w/RA TAG 2-7/8" 6 11893-11898 0 10/14/13 2-7/8' 6 12142-12157 0 06/17/14 PBTD —{ 12394' 1'1'1'1'1' 4-1/2'LNR,12.6#,13CR VAM TOP, — 12469' .1-11111111 .0152 bpf,D=3.958" DATE REV BY CO V$U'IrS DATE REV BY COMMENTS PRIDHOE BAY LtlT r 08/11/13 D-25 IMT1AL COMPLETION 12/10/13 F I-VJMD ADFBRF(12/02/13) WELL: J-29 08/19/13 PJC DRLG HO CORRECTIONS 06/18/14 RMWJMD ADPBRF(06/17/14) FERMI'No: 20130330 08/24/13 JT/PJC BF,VVELLFEAD UPDATE AR No: 50-029-23486-00 10/09/13 JLS/JMD GLV GO(09/29/13) SIC 9,T1 N,R13E 801'FNL 8 1951'FEL 10/13/13 JT/PJC FINAL ODE APPROVAL 10/21/13 JDMJM) PBRFS(10/14/13) BP Exploration(Alaska) RECEIVED STATE OF ALASKA NOV 12 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND L&GCC 1 a. Well Status: • ®Oil ❑Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1 b. Well Class 20AAC 25.105 20AAC 25.110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ ❑WAG ❑WDSPL 0 Other No.of Completions One • • ®Development 0 Service 2. Operator Name: 5. Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 10/14/2013• 213-033 • 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 7/18/2013' 50-029-23486-00-00 • 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 8/6/2013 PBU J-29 • 4479' FSL, 1951'FEL, Sec. 09,T11N, R13E, UM 8. KB(ft above MSL): 77 07 15. Field/Pool(s) Top of Productive Horizon: 1162' FSL,5134' FEL, Sec. 04,T11N, R13E, UM GL(ft above MSL): 37.6' • Prudhoe Bay/Prudhoe Bay. Total Depth: 9.Plug Back Depth(MD+TVD) 2791' FSL,5084' FEL, Sec. 04,T11N, R13E, UM '12394' 8683' • 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 642402 • y- 5970531 • Zone- ASP4 • •12485' ' 8641' ' ADL 028281 • TPI: x- 639177 y- 5972434 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 639192 y- 5974063 Zone- ASP4 None 18. Directional Surve Y ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD):(Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1975' 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, MWD/GR/RES, MWD/GR/RES/NEU/DEN N/A 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 131.45# X-56 Surface 114' Surface 114' Driven 9-5/8" 40# L-80 41' 2625' 41' 2621' 12-1/4" 1808 sx LiteCrete, 315 sx Class'G' 7" 26# L-80 38' 10259' 38' 8576' 8-3/4" 266 sx Class'G' 4-1/2" 12.6# 13Cr80 10081' 12469' 8416' 8648' 6-1/8" 293 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ (MD+TVD of Top&Bottom;Perforation Size and Number): ND) 2-7/8"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr85 10086' 9964'/8310' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11893'-11898' 8911'-8909' WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No - • DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 2200' Freeze Protect w/75 Bbls Diesel !°.x'14.1!3. 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production _ N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period ••' Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No • Sidewall Core(s)Acquired? 0 Yes ®No . If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBS,ME MAR 2 0 2J.- Form 10-407 Revised 10/2012 CONTINUED O RE ERE Submit Original Only USF 4/7z/14_ �, At.Z� ���� 29. GEOLOGIC MARKERS(List all formations anc Drs encounter 30. =ORMATION TESTS NAME MD ND Well Tested? U Yes ®No Permafrost Top 47' 47' If yes,list intervals and formations tested,briefly summarizing test results. Attach separate sheets to this form,if needed,and submit Permafrost Base 2026' 2022' detailed test information per 20 AAC 25.071. Ungu 4146' 4066' None • West Sak 6089' 5271' Colville Mudstone 6798' 5669' HRZ 8369' 6878' LCU/Kingak 8620' 7104' Sag River 10267' 8583' Shublik 10305' 8618' Sadlerochit/Zone 4 10401' 8702' CGL/Zone 3 10591' 8854' Base of CGL/Zone 2C 10714' 8936' 23SB/Zone 2B 10796' 8982' 22TS 10942' 9045' 21TS/Zone 2A(Invert) 11282' 9096' 22TS(From Base) 11637' 9026' 23SB/Zone 2B(From Base) 11743' 8980' Base of CGL/Zone 2C (From Base) 11881' 8916' CGL/Zone 3(From Base) 12000' 8862' Sadlerochit/Zone 4(From Base) 12181' 8780' Shublik(From Base) 12441' 8661' Formation at Total Depth: Shublik(From Base) 12441' 8661' • 31.List of Attachment: Summary of Daily Drilling Reports, LOT/FIT Summary,Well Schematic Diagram,Surveys,As-Built,Cement Reports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Jacob Thompson,564-5579 Email: Jacop.Thompson@bp.com Printed Name: Title: Drilling Technologist Joe Lastufk Signature: I 'hone 564-4091 Date: it 134 i3 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only Ild f = 4-1116"CNV SAFE )TES:WELL ANGLE<70°( 1Q944'*** WELLHEAD= FMC 11"5M ACTUATOR= BAKER C J -29 4-112"...'ROME TBG& P ROD LNR*** INTIAL KB.ELE 77.07' BF. = 3 KO = KOP= 294848' 510' H9-5/8"TAM FORT COLLAR,ID=8.835" Max Angle= 118'@11816' Datum MD= 10623' Datum TVD= 8800'SS 2013' 4-1/2"HES X NIP,D=3.813" 20^CONDUCTOR 131.45#,X-56, ID=??" —114 9-5/8"CSG,40#,L-80 BTC,ID=8.835" H 2625' GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3533 3514 19 KBG2 DOME BK 16 09/29/13 4 5562 4990 56 KBG2 SO BK 20 09/29/13 Minimum ID = 3.726" @ 10068' 3 7714 6302 35 KBG2 DMY BK 0 08/10/13 4-112" HES XN NIPPLE 2 8828 7289 27 KBG2 DMY BK 0 08/10/13 1 9859 8214 24 KBG2 DMY BK 0 08/10/13 ' 9935' —I4-112"HES X Ni',ID=3.813" 9964' —17"X 4-1/2"HES TNT PKR,ID=3.856" ' 9999' —I4-112"HES X NP,D=3.813" ' 10068' H4-112"HES XN NIP,ID=3.725" TOP OF 4-1/2"LNR —I 10081' 1-- 4-1/2" --4-1/2"TBG,12.6#,13CR-85 VAM TOP, H 10086' / �, 10081' H7"X5"BKR HRD-EZXPLTP,ID=4..32" .0152 bpf, ID=3.958" TN i 10086' 'H4-1/2"1M EG,ID=3.958" 10103" HT X 5"BKR FLEX-LOCK LNR HGR,ID=4.32" 10113` —15"X 4-1/2'XO,ID=3.870^ 7"CSG,26#,L-80 VA M TOP HC, —I 10259' .0383 bp,ID=6.276" PERFORATION SUMMARY 10118' H4-1/2"PUP JONTw/RA TAG REF LOG: ANGLE AT TOP PERF: 117°@ 11893' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 2-7/8 6 11893-11898 0 10/14/13 11396' H4-1/2"PUP JOINT w/RA TAG FBTD 12394' OW.1 4-1/2"LIN, 12.6#,13CR VAM TOP, -- 12469' �.�.�*�*�*; .0152 bpf,ID=3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/11/13 DQ25 INTIAL COMPLETION WELL: J-29 08/19/13 PJC DRLG HO CORRECTIONS PERMIT No:120130330 08/24/13 JT/PJC BF,WELLHEAD UPDATE All No: 50-029-23486-00 10/09/13 JLS/JMD GLV GO(09/29/13) SEC 9,T1 N,R13E,801'FNL&1951'FEL 10/13/13 JT/PJC FINAL ODE APPROVAL 10/21/13 JDMJMD PERFS(10/14/13) BP Exploration(Alaska) , T PAD S 32 as LEGEND NOTES: „ R PAD 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. T.10 + AS-BUILT CONDUCTOR 2. BASIS OF LOCATION IS J PAD MONUMENTS J-1. T.11 • EXISTING CONDUCTOR 3. BASIS OF ELEVATION IS J PAD PLANT MONUMENTS. 4. ELEVATIONS ARE BP MEAN SEA LEVEL DATUM. # LIGHT POLE 5. GEODETIC POSITIONS ARE NAD27. 5 4 ' 6. PAD MEAN SCALE FACTOR IS: 0.9999232 PROJECT 7. DATE OF SURVEY: MAY 30, 2013 8. REFERENCE FIELD BOOK: NS13-28 PGS. 31-36 RPAD AO% Hs so 4SOF q 1 =: N`PA8D CC2A 9 ,Q„ ( S_I Se �'r•°a„'iV ISI SURVEYOR'S CERTIFICATE * 1 01 *i 491H /\ °'°> O PAD� it ti PROPERLY REGISTERED AND LICENSED i� 11 -� ,p40ijjj''' TO PRACTICE LAND SURVEYING IN 17 GC2 2” "M ^' .� -= e• r/ THE STATE OF ALASKA AND THAT i-'� 'f I C -.-_..� THIS AS-BUILT REPRESENTS A SURVEY •°” i°'." s "«****',.7 MADE,BY ME OR UNDER MY DIRECT VICINITY MAP 50 li`�;(Rf hard F. Allison r SUPERVSION AND THAT ALL N.T.S. 0� f O� 8 a DIMENSIONS AND OTHER DETAILS ARE • 4.0 CORRECT AS OF MAY 30, 2013. ,if ESSIc littwANO CN2H' Ill .N r} ■10 Z 0■24 Com? ■19 a 5■ ■11 ■22 CA ■ CV •21 I 11 ■6 14 15 2 1625 2617 27 28 18 • ti ... . — N- 3u •7 1 112 X2■ ■13 2■ �T iiii •8 7J ■23 ■20 ■9 GRAPHIC SCALE V 0 150 300 600 l I ( IN FEET ) 1 inch =300 ft. _, J—PAD LOCATED WITHIN PROTRACTED SECTION 9, T. 11 N., R. 13 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES . COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV, OFFSETS Y= 5,970,531.14 N= 2279.94 70'19'37.300" 70.3270278' 4,479' FSL - J-29 • X= 642,401.71 E= 1295.04 148'50'42.459" 148.8451275' 37'6'• 1,951' FEL ORA VN:DK , 0 b'ellCHAM". 6 1b� - ESzw DeE: 6/1/2013 CRAVING: Fl2916 WOJ Ot �+�'T� �Jc NO: WOA J—PAD xA�: AS—BUILT CONDUCTOR LOCA11ON CO ,/2013IMOD FOR INFORMATION CA JZW 1 of 1 V/ NO DATE I REVISION EY CHK I 1• = 300WELL J-29 BP AMERICA LOT/ FIT Summary Well Name: J-29 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 07/24/13 LOT 2,625.00 2,620.69 9.20 710.00 1,962.49 14.42 07/30/13 FIT 10,286.00 8,587.32 8.50 900.00 4,691.81 10.52 Page 1 of 1 V 0 0 a Q c yw c L o ix o O O W O W O c N I- V J F V O (aV W o) W V m W W V is c a '�r- 0 O. 0 a W Q C Y) Z c - O U) O F U) U 1;�a1 d Q N O1 0 Z O z CO C r0') a) ci 0 - 0 0 CJ 0 I Q `n 'cu- a, O x x 1 C'' 0 moaN E E Q Q n o C 7 NQ .>,. u, >. c7) N \ a 0 a W U O O O N -f = a) N 5 a) a) 5 N O O > > 3 O O O N ire V N N N N 0, co a a N cal co rJ a) > ' N Z' W a) Z' N r C x CJ ^ C C V EV N O O W O O 2 O W O a) O o 10 m 0 N = L 1t co Z con 6co Q n a H Io. o� W o E4. ❑ 0o 0 o � (n Q U. X Z o >- 1 o m .. .m 2 W ao L m a I a a)C c ) X (c!) W a n °' E 0 7, - n ov n a c, a_r O U) 0 0 Q O ui O o - uu-J o Tr-, 0 Cl N T w > E a a a) NJ• a0 J E E ❑ a7t a) p 2 d 0 aO w U) d O " O .Oi m a) O .d > O > 0 I t m• N N O `Y-' a.' a) O a) O ri 0. C O) O C (h U) O U) O CO d w CC > o o c a w > a N w > RI LO °� 3 V in 8 c8) Z N v U Z n N N E 0 p N X X 2 > O N X x > > a) Q C) a) 0 N (o a) 0 O W W U) d OW W U) a > 3 c °� > n •.-. - :-1 0 4.r p 2 '8 'O N d co d E 3 7 Q 0 6d O ILL IL 0 Q a _J 0 E .a Q L 0 N Q d ^ O K C V V H Z :12rn Z M O U 0 u 0 1 0 0 m o) L m ----• rn 2 N ❑ N in d O) . d n a o ai O O O O a n Z E r ) CD 00 v O 00 E U) rn -, N N m a) 6 am aO co m E a E c u coaO a 0 0 N a) ` . Z > U n N rte. 2 U U) U) LU < OO a) > 77) N !z U E c c LU E E F N > > O N > >ai O l6 X . @� Ta C N l0 CA X_ 4c N Z LU U 5 H 0 C7 U S H 0 U' Q 0 Et Z U3 W Q o LU C7 0 - Q W z Z H m o LU Q < LU = . N a W U 0 LU o N rn o Z 0 a W 0 W 0 z 2 U LU LU U F- Et O ❑ 7 Q a w _. z o g Q o = C7 I w U -a U a 0 W g o m 0 O W z IX W c Q 0 0 0 0 O K _ �_ U) U) •• w 0 u) 0 r- U d co. m N a) O a' Z' Co- m 2 Z Eal 'Li N E m 0 Z w a, W z o m a) 00 d c •m E 0 U z o LU 0 a7 c H m ❑ 0 E tA ac) a) 0) ai ai ai o E E ac) -- -o E ai -o E c d >. `o .. U a > .m a) ami a) d a >� r > U E d y a) co E 0- N a) U) N E U H ` 0_ C C o E O Z I- N O > T Z HT N O > T o o ° > o E E a) m .� v Z' a -o Y a`) a m 'o Z' a -o x a`) a m co co a O a w O > ' U U a Cr Cr LL �) a' Y U) 0 2 0 it (n Cl_' r (n O 2 C) 0 0 0 v p r N L N N 0) a) 0) a) N c H CA a) O _ a) O a) CO LL 0" .... ` N LL LL (1)'-- a) 'eh E N °... M O_ 0- D d O O ce cc O C E E N O H o U r N rn W V m N- Q C v o UO F W v co Z c -o 6 Q Wo r t m 0 U U U U L o 100_ tT N O O O x 0)N U N n E m m m Q N Ca Q CL d �, 2 N a o e C7 n LL N p LL -0 U O O O O E a N.N 5 n O O O CO p U N (') O U 3 O O O O O N N Na N N c L E CA N E al E o_F c X_ C c U 0.1= F U O o)N E O C] W O EO t N E o .. C1 O C v o O C .. C a) Cp 13 :I 4 =W O O O 00 a) 0. LL co O O O Qfn Q x a) CD >- cd`) a,) 0 L O V ai L 0 V E c 2 LL E c m LL o 2 a`) = o m a`) 0 J f hp U0) E V) n a U ., 0. J O O } 12 HO CD M O O .C7.) ,-, O O M N L N LD CL I N 00 J O c N N a) E c N m 0) a E O d y n 0 ami 3.)) Ucoa - a U fa CO t' m a) d L• E o O O U 0 O N V CO w E o rn c a- m N > c a) c a m o a� E a 0 a) a) Q A U I= c a) x x 0 > a) N U m E C1 C co F v o W W C) a > 0 .C') . w a o '0 -o -a �S o a) N- LL LT. Q o LL O OEo co p 6 E p •C1) OO Q d J N y Q N 'y L V N Q a 2 0. a d 0- aTi O Z F LL o) O LL Z co O Q w O QCo) - V) m 0) o N 0 N V) 0) B- 0. O Y7 O '0 r co Cy O co) CO m ° E o d U m O O Cn LL Z E if cc; OC U E 6 d O E -o i Z a, LL LL r > a) La ga U U) U) LL' Q O N C CO _C m • i O E .2 a) a O E O (a N T O E C C F 70 co •-.8.-', 0 . U LL vO Y L v Aq i O N aC Z co F- O o 2QU § 0 O U >7H D CJ CO 0 co N C1-� LL W o W @ [1--� E L H a U S E LL a o - Z U _1 U a o I LL Q LL Q LL 2 • _ Q O CD O NO N O CUa N O N CO Y N O CO O Z o m cC 30 O Z a v F ce rn g - m LL W o O W 0 2 D 0 o LL Cj O rn O W O o d U VI V) o 0o CO co 0 U C1 LL CO Z N U n N N LL E m 0 z W Z L _ N W F 2)- a, o O} U O a a 0 N ai m o a F U E O E a CD ? a") E v -o N a) U) d E U W �[ .L.., Z F ccj) D > T c) Y v C a) C >' U N H CO N t- CD U p > O > L L. 0. -o Y a) a co R CO O CO L LL F 7 TO U -.F., a) . D O O F- U LL W U ti U d Y CI) 0 2 0 • 0 o O _Nt U O O O C1- m m a6 O C LL Q L .. O1Q m m s----o. 0 a v wo o o co - O - tri U o o o O Ess J 3 g5 D_ 1f1 1n l0 O O O "O 17 U E f- n n J N et 2 m Ol O_ WO O F O U U 0 c7 Z > 't a r' > a) U 0 °� U Ern en •. 0 CD CC 0a o m I- EN o - ei Q N -aLL o O aL ` v d ur T U a1 3 7 5 u O WN c6 Ncc,cri o NN J A"' N a' E m 2 m Ts N2 o Z Z Z z E a C K C U .-. LL F U 0 2 0 W O c O ` I C a) O O U d' a) '..C o Z cn -.=• o co co In LO .O U W O O r (O (O '�a) O_ LL co Z p u) Q X cc; Cl) n W a U n oa N a O a . o c -O o o cn o coc6 } v = EN (pcN O o a a co c Oaa) co M_ a3 M N Ti } E ' o O > LL = N N O r J N D CO E o N N CO a ap N c8 d d m o r r- isi m U > N G ,. o m co °s m Z' a� o ' a m 0 a c > > N a 3 a c, co a o N g in o N u) E CO w > a ai n > a t o co v n° V w cam) cvi Z m E > v m C m ' o w w in a m a m to U a. r- W 4 E E o 'O W rn c) NEL N LL m a >- Ec•-) (0 LU us N D `r- D_ OI (n 0 Z I- O H a } Z _M Q O a) O Q W O) O 2 N 0 N d O m 0 r • ui �g m 0 O u a a R Z E co OO U .N N F n d y ai ao 0_ cn a o m Z > o 0. �_ W OI '.0 ` N H o a fn ( n a < _ O Oas V 3 2 2 O N = U) a) N > cc E 2 C C O O O O O 0 C7 a) 0 C LeiO O O w - a) > u) O O N O NI OX d' N ' C N m Ja3 � U 2 5 Lo L4 4 H O 0 0 `� N 2 0 0 0 r E 0 0 0 us O_ C rnO. N E La ca c0 H r V > w d' - fn Q 0 d N W V 2 O O O O O to Cl t!] O Iii Z Z E O_n O (O a0 N W W o E a ° O Z Lu W O > a v O Z H UQ U m O Z W a a o T H ~ N O J V 0 O N W W } o a). Z U) mW O W a. E mm O Z y U U O- U J - E J IIIZ O a }O Q O_ 0- J Z Z CON Q0 d v - al 2 'o U Q W W W H J • a s o m a) ami a EC W W 'o oo c- ~ ) o n U) 0. O F U U I-- a) a) o = Zg5Z E 2 ul w > , a W W E Q m >> 9 Z' o -c Y 45 w m O a Cl- O > O D U .2 C o 3 L N J W Nu) W U a w U LL a } cn O C7 0 0 6 6 0 V 0 C a) o.a co O N N N a) N a t Z Z 0 O. a) ce O n csi j _M n °o )° O m N N a0 m1- ~ N Q: I Nus E a o a)d Z C m o m y t D Z M C O a W O J a) o. LL CO Q_ V) < X U W V 2 w U 3 J i Q Z 0 to - I M E v > } z o o (U n a -C 7 M N Z y > C N m 19 17O . o`o�pp CL 0:, N a)U CO a) a) c C ) r as y 2 O a) C Yo. a Q W Q_ > O. m H O O 6 � yy O a7 Q V . U j ? a a W a o a+ N. H c o aa. E E C v) aE) c V C O J Q. z F U O E U O N U E N d n H m jK C V @ d E E © 8) o <n L m' y p _c ♦♦ N < a) O O O D a) O � V 2 0 2 H —, 4= CC 2 O Z H Z M O v¢ o p 0) NN a) N a n z E m E '2: m o. m m m E -o F n z 6 Q_ o m > F13o N O) U o fn fn Q_' Q fn tI IT H O 2 Z 2 Q r C o ^ G cv V _ 7 a Z U aaTo U z o W Z Z Z ,2 Z C oo •E m aa)i i0 W a) Z J M M o c co C y 0 y s' N T Z " ca c O IE lo Z 0 a) J o IN J ()P_ O O O a.-10 0 -LO o a 0) d 3 • N 1 o d F U 'a o a) a7 = Z 'O-' a) 1E � � 2 m E c a Q . a oL. C Uo d W O D E m c o w o w ,- I F- U U 7 m U m H 2 4 • el 0 a) crC 0- w N C O LU W O O C N 2 F- N U) p o = o) W v 'Si a ca �j c a n c 2 O 2 a) W o L oU roU c CO Z a o c m Lri m U a co °° o O U U a V) N a) C >U a > > N. mco 0Ce uo o o ) O O 7oQ Na) -0 WO -0 wO O O O O O • In > O -O a UN -O a U O O O O ^ 2 aN NNyN N CO N O OM O O O O N N V N cisx a fli 2 a 2 ao - Eist 2 2 L J N W co > ' a) Z` ` N Z. N ca 2 W N N O 0 E a) C? c x c 0 ^ c x c g N F U N O W O• o 2 O W p O a) oo O ) Q .- O _ rOZ 00 O a 0 a wC HLu o 0 a) a w c) wO o cc U Q X 2H '@ 0 of } of a a) o d WCC -O c U1 Q' U) fr --, c a) m = � N mo a ` W aUO U d O a a CL O ›- J v o CO } < o o Q o co in U) O M H M IA C,) O co N N N O ZZC v m N J E E m aj @ O _d do . 1 a7 2r? Y Z` O O Z` N O to Q 0 2 C 3 C 0Up Ci. Oi O C o U) O U) O CO d w . > O o o. N o > n N ti > R N C C r7 U a) N Z' M U a) N c' Q d J m £ o o E O 0 N X X > 0 N X o > y _ o Q 0 O W W Ud o W W U) d > _ c a v F.."= oa n av o 7, ) N dm c 10 u. LL Q CC @ 5E a o E Q U J O Q L C) N Q d a) O Z o 0) o U a o O Z co U Q prn �a CC a U) a ^ n a N 0 N rn W 2 _ U) D Q _ ai U o o r) O O (aa R O E 0 Q V O U O R R O O N d Z g, C U) O— a0 0 6 � U) O� a0 -� ai -,13m a) rn co m E a E E d 0 O U) a) a Z > 0 m m rn U U) (n 2' Q O I ON U) a cc c cc E c H H Z 112 > 73 -' o > o Lu iv; w • ���o2 2 w 0 a) a ��� TOc N < U) U 5 F° o 0 U 5 F° 0 0 0 O O W W O Q m 17• a Z Q O u O Q U Z_ Y . W i O H H V a) V N Z m Q 0 o Y .0 o 0 N V LU LU 2 q UJ o Z w .. w d a Z ,- Z oCC v LU ow Fm co mOJH re UZ ) ) 6 0 6, E NNN T Z O CO a 1---'0 W W U 0 ZW Z NE ) EmU aa W O 0 d T E N UZ o >- Co)o! 0 Z .) (I)i aaaa) p E E mai o E Uai a E U c W a 0 F_ _ o- m £ ig iii ca a ) y Edc .. a ccO us TyO > �›••, Z FT w > as> O E > aai dZ Fw H 0 N F- N- ) N- N- C, CL E a) n .0 v Z' O a Y aa w $ , a a Y a) o 2 v coCON- Oo ° o oU d W U UU aca naia II < co 0 2 0 u. Y c 0 2 0 0 0 0 rm CO U O N L N O C O 5 W E N a) c N c )L Q L 2 O a) O Q m CD C LL Q a J n. O M a a _ J — E E O us a N 0 in 7 0O F H 2 c, o W v 5 co a d W ? o O v o o FF- a t oZ > maU,lrnN Eujv � a) c,a wa, o o a a E a o , M U) 0. T L Ni a a U a - >. r oN ~ U m > U M m^ o > v w f° 0 N CO N N NLr) P y E J a O c C U O O z a) XLL N E ❑ L N C ❑ ❑ W O F U o co) E o U c C a) O (D N 7 o cm _N r ❑ Z M u) ❑ 'Cr a 3O O C O) W a) ) a O Z O N '� (n Q X a) o m co E m u- N U a o O a) N °� a Ufa g , E a a CO n. 12 m . a N- F- CO o m } a) x - aa) E o I p o M a o).- M O C 0 .0CO - O - )f) Co M N N .0 4) o N > "O O 3 N J EcN .N ai LL = a O m O 2 a a E (\ ca co U a) CL m W (n d O V- 0„, _ - r CO ai c > m E gl �' t+ p CD o Z E o a m 0 Lci O c O 3 3 a N YY Q C o) p L C (n E N cn E M Cl) y w a > a a if (n > - r a p) p E c a, a) y J m .4 O E E (' N U c°)) Z -a' E > c n QN U ---- v C N X X > N m U C1 N F U . O W W 7) a C) y _ co f , a Co 0 o s h E 0, c E U N d r LL Ln rO aLL ;59aY ao X o -J N Oi O Q E O ',1-, O a @ L V < OOa N 7 5 a" a m Cl OZ F- a o O o Y Z CO U o O F- a 0 >. Q fa 7 Cl) 0 0 0 0 o aw a;N ❑ N O a _ m ❑ E: Lr) .13 HUo a-- v o U � ', "LL O ! a'D E ° W Ja (n 5 2 v 2 - Lo o aO U M FO ❑ O (7) W a' < O 0 °= E (n Z 2 ° M N v m a 3 F- D) O) p E O (i (n o m a) (, E c_ _ o U 0 c o D_ (v) LL v a) O O o O of y C O > Z' ... W > o E Lo o m E o y a) f6 C w m j NCD O a) .0 X a) a, ,O a`) o 0 5 0 F- O C) C" v _ 1 co m o o o E 1 a) aa)) °-- a o0 0) O m E r u_ . y M Q 5 a' a 7, 3 O) UJ - v v o H F - a) ate, ,� U) a Oz Z E a s u) N W E a 3 0 2 o > d v a O Z a v F U U ‘2. _ 0 a W g ❑ o O O w Z a s Z a CC r2 co co O a T F N OJ o W ❑ ❑ J) (D F— Z 0a) w >- O E m O Z H �- u)a. U) U E ❑ N O } _ -O- co o ce } O a a N O Q m - ❑ ❑ N- ai 2 -o Q a a a E v w ai ate) E 0 a a I- E o o T - - E a n ai co a a E U F- N Y v a m D > T O Z C a) C .. U 2 N N a) w - O 'ET > o F G Z °a ii L o m a 0 a w 0 LL �n a. y u) O 0 U CO 0 CO N CDa co 0 N O co 1),--- .2 ` a) N ✓ Z Z O )Z U) IY O n N co t O F t` Oa W N m 12 H a0 � n J N > • Q W " Ip E E o o ID N U a d z oru d F- C MI ‘.0 . a Z m c a 7 W O J ce )• n Q X Co 3 O O O )p M E ai >- z 0 o n n r 3 . O6> C N J O 0 rt, O CL ON N Um N N C O. y • ON C Q O O .° N tri H CC N CL OU C O vcn W 2 > N O U Q y 0 U ° N C) H ~ Nd) Q O > '0 d LL "6 'O 0 u)N i+ I. N C .o y E E C C w E C_ N m N • v = O ~ J a z ~ O o f .1 o p E a) G) '� �_ ° o m ill N Q c N L U N Q N O O O D 4) O -MD 0 2 I- -, w M I O Z )J Z CO }O Q o p o) N o N )n I mN ,-.i...,O E a z o O V) a N m m E v )2 a z ° r I a o m N r z > o «0 m L 1 u) u) Lr Q u) t C) t O C (n JI d, �, Q, O = m oN F O O_ O Il H O = z Q V C ..r) oC N ) O 7 Z Lj n. O m rn op z o a W z — Z z I I O N O C C >, I-- a' z ~ N Z Q, O J O) O O O C.) N J C co- l`') L y I-) (n 0 C O N E m• p Z 0 O J N l0 J O O zTr) .0°c E. Y a) 8 p a a p O v a o • 2 d a) N d J Oa a ° ° m .� m Z ° o •�� H U N lL E U l0 d C j d Q 3 (7 O C O O` > O > W N N N 'O d' U O- d IL U o. W 0 7 y E N m C O W O E N Co 0 01 a) W ^ _ a 0- .__1 O- n- O N c co _ a I O O W LU O 0 N om) o W = o @ 35 C o_ = — S 0 Q a) fa 2 N 15, CI H co H Z H O - - O (p a) o— COc- CoO W '.o CD ff 0 0 U U c� � 3 � 3 3 Y a' . m m m iCoM YNE E . Q Q ' V m 0 a 0 o 0N H _ ` I -0 U o 0 Li 0 Cn Q O -0 U 0 -0 -0 0 O O O O o M r") co 2 2 a) ° > a) a) > N 0 0 0 0 0 N- O N o h X 0 o O N O O co N R C E O cc?) O O 0 0 ii co Cs,J O 2' N 2' ur 2' N 2' Nn JO Fn 2 CN Ca) O_ C) °C m X .r-. C U m a) XE ❑ v ❑ O w o 0 0 w Coo U a) o_ O d - C) 17. OC aIO CCD ' C ❑ n o u'w o f O H H o O o. COw - m o 0 a m < x m .. 0 oLci ° ° ° o d w ,,,a 1 a C U cc to 3 _ L ^ _ _ PA o (j U g a u) o - - a Y o v o } a o o Q o v '.. U) O Co H d' N co CO M O N N N N 0 0 0 C m —1 E E ca NN > a O> aa. a) d a Si c ) It ❑ m m .o L".5 O E o a C 0 o V o V Q. 'C O) O C O O CO W L > O Co a rn N > n. (n u, > --O C C co N N u! E N O E 0 0 a) X X 0 > p N X X ' > N Q—I re E o m 0 ❑ W W cn a ❑ w w cn a a a ad > QN m a as > II cc o < //C�) m -J Q Q - d na) Q N 0 CC a `o ;,--)- O O' I ZU -° o Y o Zr c„) y0 IQ w 17; 131R ° "Si v) ) -- o) CI to a (n m 7 a N ' a O a o _CI iii o g o (gyp m O N O O U u7 (o O O O a Z E ) CO • N N O O N a) G) N a) 0) Co 0 V) Co (o Co 1 co a0 E -o E s a l ❑ a 7 a) a) 1 t Z > 0 U) N w U ibi cn ix .cc O QJ O N a) a a E c C LU E C H H d o .o -2 Z li N X O N C N N .3 a) a) C N Q Z Y (n Q v 2 t° o 0 E-5 H Cl) 0 O cn O O w ❑ a W m ❑ LY m Q J Z W Q ❑ O a cc ct W Q LU Z Z Y 0 W 0 azi CD Z Q a N a N W O U o Y O o OZ 2 U rn -o U L Ce H > ❑ ❑ a w W Z = w U' O CJ .. o W Q o o O IO a Z I O LLI U LQ Q o 7 o. o Q J (n a .. LU LO U) , U d .- N a) Co o, _ `1 (n m 1E Z ❑ m M LU W a) N > w (n U Z 6 ciIQ Z E Q 2 N 1� a w o ml 0 >. Y`a ° Z p Q } a m cn E Cl) U Q , m a U ❑ aa)) a) m 2 ai U) E E E a a a fl- o .. 0 a ° H .n w ai a-oi aoi a) y m .. ami -o >' m > E a n a cn E a . w ° Cl) ° E n H E n C C ° oC o Z H N D > >a. o Z H� w 0 > >a. O 0 C E o C -. E E ° is a -O Z' ° . co H a o .. co H N. CC) O r` CC) d 0 > 0 U a a`) -0 ul a -0 a) '0 CO V CO O CO 0) O a w O ❑ 0 t•_j U a cc a) LL a Y v) O 2 C7 u. o a Y (n O 2 - 0 0 Co ❑ ❑ O o co o O O o Y N 471 3 a� �° o. 0 0 o x w E ca N " Q LL Q an d N N O O 0O O E E0fl ' a7 J U O. O O co E E o O /N 0 3 _ N N N U O g m r- m = O C U o v a Q > 't a > ami chi to r m E U) m D � o- o U 0 o V O. d p 0o. p L lD N M oLL•cr LL U ` LL` � o. >+ co 0 2 m `^ U H o co ,N-. co In m 0 N R 7 a) N co_ N L_ N p _ Z Z N 2 w o E 0 E r C X C p LL M H U O OI N E 0 0 W p U c O 2 16 .. a c f0 N C O Z co to .. O co Q'3 w Oo t O CO .- o N N CC to Q X m ui U L d E m ° LL J O N N °� d ^ . m U - p- 11 EE LL .0 LLN 2 -o H LU O O >- m 2 a) a' V W • LL o M a O p MQ N N M N ^ a E al co > r N o 0 > 'O , o > O. LL = O O ', N 1- a) E C N m a) D' N ao -I p a. u) a E co as U in a) 0 a E'- d 0_ ao m .4. a, LL > 0 w E a l I a7 N Z. a) p m m Z. C 3 V a J n CO _o L cn o m CT) E a W 2' > o.0c _ o- 6 N > 0 7 r 0- N c_ E. J m a o a) E E "' y U cu ? ' E >_ d - <l cn N 0 U '-' M O W W 0 d 0 a m H U r n 9 M E C U o c O 'O M E rn o LL w 6 LL O 0- E x r-- -a- = Q O N N OO m d .t O) w r L U N Q -O p 0. a) o oz U LL O H e } o Z c•-, O} Q a) o O rn O rn m rn o DN O _� m o N if. o. O U N O O Z.HmE OOaD 0O ) N .Nd Z o- 8-0 o N j a UW u)_ E a m m -o 5 LL O CO E a o ai .cm m p U) u) C Q o CJ 4? E r 0 ? o ao m o. Y- 0 ur E _ a K orn o o D y • M m E c o 0 5 U C Oo O O LL d > O o E h a) . co co > O a= a7 n f0 O N N f6 C N m 7 V x Q' d o 52 H 0 0 "..i) v 2 co o 0 3 a o E 0 0 ELL o a) ui ui CU al 0. `- H > ua m E l' L H _ 0 QO � � LL u o a 2 Lu Q OI- a) ami o q o0Ca N O Z Z E a M aJ N Ili l!) W 00 E a O z 3 o w W > a' v j O Z 2 ,.. F- 0 0 a Q '� W U LL Z d 0 a) a 0 ? O W - U o H 2 M IN I J O U 0 0 al W QQ } o T Z O U E LL O J W N r N E m O °' coO. } E J Z o 0 } p c, p_ ULI-I J O Q d v U D co 7 d Q a n a E m E ai m E aa) li D H -D a .. p_ w i Cl' d ' W F- al E ) 2 HCO T N 0 > > o W S Z c 0 0 > o > L a Z' a -o x a) , w o U 0 Uj 6_-- i-- F- 3 " 2 = a w w 0 LL w v U. w a r co 0 2 0 co 0 CO• 0 M N CO 0 M O N La HI' a I''..�0 i z z N cev V ri CO M O F co N ~ N a) y a7 O a) M H o O. d Z c mco '.,r °''iZ M c_ o. 3 W o 1 J aeIIOn�¢ X I a It M E z z M N Ili = o d 5 Z 3 I o > N N N C a) 2 O ai m COCO ca cr) L CO N ai a Q a) .. d Q 2 N o C N u) O. W e > a .. N 0 O 5 CrO 2p N d) N U U Cr Q) H ~ O E., a a c Q r s O > n LL -o e. v En y a` :N g a c c w E c U C o ~ a° z ~ U o E a) 2 cm v E N G1 r a> c o T, d o cn m - 0 0 E ce En o L a1 N Q a) O O D a) O 0 1 0 U Z o) >- < O IIN N j) Ia d ,.. m ^,m m n a o H a z a) Q) ui r z > o .S rn 't r r•-• .S u) Cr C N -E-'” c a) o J a) O = m Od = _ O I L IL= O = z 2 Q rn C O O a7 - N p O N 3 O U d U 7 d �- Z O W Z Z Z U I W U` H o E c T U CC Z N Oo E a1 d 0 0 7 O) cam. 0 0 3 M '..N = J C CO M L N n O z a A C a N E 0 o z 0 a) J N Z 8c,,ra 8- 3 N T) v U a 13 a) o J C O' T O N O a, .-. O YO -O O U'~ N C ,:1_, O C E 00 N C 7. d a) a) N a V a d d O ti O U aiw O E m m c 0 w o A' H U U D o7 U 0] H S North America-ALASKA-BP Page 1 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor.DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/15/2013 00:00 - 08:00 6.00 RIGD P PRE PREP AND SCOPE DERRICK DOWN -SECURE DERRICK -PIN BLOCKS AND TOP DRIVE MOVE AND STAGE CASING SHED FOR TRUCKS 06:00 - 12:00 6.00 RIGD P PRE WALK OUT MOTOR SHED AND PIT COMPLEX -SKID FLOOR AND LOWER DERRICK • -UNPIN PIPE SHED AND WALK OUT AND TURN 90° 12:00 - 00:00 12.00 RIGD N WAIT PRE WAIT ON TRUCKS -SIMOPS, GENERAL RIG MAINTINANCE AND PREP FOR MOVE 7/16/2013 .00:00 - 08:00 ' 8.00 RIGD N WAIT PRE CONTINUE RIG DOWN OPERATIONS AND PREPARE FOR RIG MOVE. -WAIT ON TRUCKS 08:00 - 12:00 4.00 MOB P PRE MOVE CASING SHED TO J-29 12:00 - 00:00 12.00 MOB P PRE MOVE SUB,PITS,PIPESHED,PUMP MODULE. AND POWER MODULE TO J-29 AND SPOT 7/17/2013 •00:00 - 12:00 12.00 RIGU P PRE RIG UP ON J-29 -WALK MODULES INTO POSITION -RAISE DERRICK -HOOKUP ELECTRICAL INTERCONNECTS -RAISE CATTLE CHUTE --SWAP FROM COLD START TO RIG POWER -ENERGIZE AIR SYSTEM -AT 08:00 HRSAOGCC NOTIFIED BY EMAIL OF UPCOMING DIVERTER TEST 12:00 - 19:00 7.00 RIGU P PRE -REMOVE FLOW PADDLES -INSTALL GAI-TRONICS -PREP BOP DECK -UNPIN TDS -PJSM ON SCOPING DERRICK TOP SECTION 19:00 - 23:00 4.00 RIGU P PRE SCOPE UP DERRICK TOP SECTION -UNBRIDLE AND RIG DOWN BRIDLE LINES -SERVICE AND INSPECT TDS -INSTALL OUTSIDE DIVERTER LINE 23:00 - 00:00 1.00 RIGU P PRE CONT RIG UP -INSTALL KELLY HOSE -NU ANNULAR AND RISER 7/18/2013 00:00 - 03:30 3.50 RIGU P PRE ACCEPT RIG @ 00:01 HRS 07-18-2013. -CONT TIGHTEN ANNULAR PREVENTER AND RISER BOLTS. -SEAL JOES BOX. -START TAKING ON MUD. -HOOK UP ACCUMULATOR LINE AND ENERGIZE ACCUMULATOR UNIT. 03:30 - 04:00 0.50 RIGU P PRE -PRE-SPUD MEETING WITH RIG CREW AND 3RD PARTY REPS. -HELD RIG EVACUATION DRILL,RESPONSE TIME 4 MINUTES. 04:00 - 05:00 1.00 RIGU P PRE CONTINUE TO TAKE ON MUD. -SIMOPS: -CALIBRATE AMPHION AND TOTCO SYSTEMS. 05:00 - 07:30 2.50 BOPSUR P PRE -FUNCTION TEST DIVERTER. -SIMOPS: I-MOBILIZE BHA TO RIG FLOOR. Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 2 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 i Spud Date/me:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL©77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 08:30 1.00 BOPSUR P PRE PERFORM DIVERTER TEST AND KOOMEY DRAWDOWN. -ANNULAR CLOSED IN 38 SECONDS. -KNIFE VALVE FULLY OPEN IN 5 SECONDS. -200 PSI=12 SECONDS. -FULL SYSTEM PRESSURE=45 SECONDS. -TEST WITNESS WAIVED BYAOGCC REP JOHN CRISP. 08:30 - 10:00 1.50 RIGU P PRE MU 5 STANDS OF 4"HWDP. 10:00 - 10:30 0.50 BOPSUR P PRE FILL STACK CHECK FOR LEAKS. -FUNCTION TEST JET PUMPS AND LINES. 10:30 - 12:00 1.50 RIGU P PRE MU BHA#1 PER SLB DD. 12:00 - 13:00 1.00 RIGU P PRE PRESSURE TEST SURFACE LINES 3,500 PSI. 13:00 - 13:30 0.50 RIGU P PRE HOLD PRE-SPUD MEETING WITH RIG CREW AND 3RD PARTY REPS. -CONDUCT RIG'EVACUATION DRILL. ✓ 13:30 - 18:00 4.50 DRILL P SURF SPUD WELL AND DRILL T/410'MD. -450 GPM,345 PSI ON. 40 RPM,0.5K TO ON. PU=59K,SO=59K. -ART/ADT=2.65 HRS,TOTAL BIT HRS=2.65, TOTAL JAR HRS=0 HRS. -DYNAMIC LOSS RATE:100 BPH. '18:00 - 19:00 1.00 DRILL P SURF RUN GYRO SURVEY AT409'MD. STATIC LOSS RATE:0 BPH. 19:00 - 20:30 1.50 DRILL N SFAL SURF CUTTINGS TANK LINE PACKED OFF. RECIPROCATE PIPE WHILE CLEARING LINES. 20:30 - 22:00 1.50 DRILL P SURF POOH W/BHA#1 F/410'MD. -CLEAN AND CLEAR CUTTINGS TANK AND LINES. -L/D UBHO,STABILIZER,PU AND INSPECT BIT. -MONITOR WELL FOR 10 MIN(STATIC). 22:00 - 00:00 2.00 DRILL P SURF MU BHA#2 PER SLB DD. 7/19/2013 00:00 - 02:00 2.00 DRILL P SURF CONT TO MU BHA#2 PER SLB DD T/285'MD. 02:00 - 02:30 0.50 DRILL P SURF RIH W/4"HWDP F/285'T/410'MD. -MONITOR WELL VIA PIT 2 02:30 - 03:00 0.50 DRILL P SURF DRILL 12-1/4"SURFACE HOLE F/410'MD T/ 472'MD. -505 GPM,125 PSI ON/680 PSI OFF -MUD WEIGHT:9.2-PPG IN,9.2-PPG OUT -PU=87K,SO=87K,ROT=87K -60 RPM,8K TQ ON/1K TQ OFF -5K WOB -PU=75K,SO=72K 03:00 - 04:00 1.00 DRILL N SFAL 470.5 SURF CUTTINGS TANK AND JOES BOX PACKING OFF. -ROTATE AND RECIPROCATE WHILE CLEARING LINES F/471'MD T/465'MD. • -80 GPM,100 PSI -15 RPM,3-5K TQ Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 3 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UW: Active datum:J-29 ACTUAL©77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 05:00 1.00 DRILL - P SURF CONT.DRILLING 12-1/4"SURFACE HOLE SECTION F/472'MD T/535'MD -505 GPM,125 PSI ON/680 PSI OFF --MUD WEIGHT:9.2-PPG IN,9.2-PPG OUT -PU=87K,SO=87K,ROT=87K -60 RPM,8K TQ ON/1K TQ OFF -5K WOB -PU=75K,S0=72K 105:00 - 07:30 2.50 DRILL N I SEAL 445.0 SURF PUMP OUT OF THE HOLE F/535'MD T/445' MD -CUTTINGS TANK OFFLOAD LINE PLUGGED. , CLEARED LINE. -80 GPM,15 RPM -15 RPM,3-5K TQ 07:30 - 12:00 4.50 DRILL P SURF RIH FROM 445'MD AND CONT.DRILLING 12-1/4"SURFACE HOLE SECTION F/535'MD T/ 973'MD -550 GPM,1065 PSI ON/980 PSI OFF -MUD WEIGHT:9.2-PPG IN,9.2-PPG OUT -60 RPM,1-5K TQ ON/1K TQ OFF -5K WOB -PU=87K,SO=87K,ROT=87K -AST=.39 HRS,ART=1.77,ADT=2.16. -TOTAL BIT HRS=2.16,TOTAL JAR HRS=2.16 HRS. 12:00 - 19:00 7.00 DRILL P SURF CONT.DRILLING 12-1/4"SURFACE HOLE SECTION F/973'MD T/1,853'MD -550 GPM,1440 PSI ON/1300 PSI OFF -80 RPM,4-5K TQ ON/2K TQ OFF -25K WOB -PU=93K,SO=92K,ROT=92K 19:00 - 19:30 0.50 DRILL P 1,853.0 SURF CBU 1X 550 GPM,80 RPM 19:30 - 22:00 2.50 DRILL N SFAL 650.0 I SURF POOH F/1,853'MD T/650'MD TO REPAIR CUTTINGS TANK KNIFE VALVE -MONITOR WELL VIA TRIP TANK 22:00 - 23:00 1.00 DRILL I N SEAL 1,763.0 SURF I RIH F/650'MD T/1,763'MD. -PU=93K,SO=92K 23:00 - 23:30 0.50 DRILL P SURF ESTABLISH CIRCULATION WASH AND REAM DOWN F/1,763'MD T/1,853'MD -DRILL DOWN LAST STAND F/1,853'MD T/ 1,860'MD(1,855'TVD). -550 GPM,1440 PSI ON/1300 PSI OFF --PU=87K,SO=87K,ROT=87K -80 RPM,4-5K TQ ON/2K TQ OFF -25K WOB -AST=.75 HRS,ART=2.88,ADT=3.63. -TOTAL BIT HRS=5.79,TOTAL JAR HRS=5.8 HRS. 23:30 - 00:00 0.50 DRILL N RREP 1,860.0 SURF TROUBLE SHOOT TDS ELECTRICAL PROBLEM ON TDS BLOWER MOTOR. 7/20/2013 00:00 - 00:30 0.50 DRILL N RREP 1,860.0 SURF INSPECT TOP DRIVE ELECTRICAL FAILURE -CIRCULATE THROUGH HEAD PIN -60 GPM,200 PSI -MONITOR WELL FOR 10 MIN(STATIC) 00:30 - 03:00 2.50 DRILL N RREP 1,860.0 SURF POOH ON ELEVATORS F/1,860'MD T/192'MD W/BHA#2 TO REPAIR TOP DRIVE TRACTION MOTOR. 03:00 - 06:00 3.00 1 DRILL N RREP 1,860.0 I SURF I LD BHA#2 PER SLB DD. -CLEAN AND CLEAR RIG FLOOR I-BIT GRADE:1-2-CT-G-E-2-WT-RIG Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 4 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date. X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL©77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 20:30 14.50 DRILL N RREP 1,860.0 SURF REPAIR/REPLACE TDS TRACTION MOTOR -STATIC LOSS RATE:2 BPH -SIMOPS: -REMOVE PIPE SHED HEATER DUCTING -BUCK UP 4"DOUBLES 20:30 - 22:30 2.00 DRILL N RREP 1,860.0 SURF FUNCTION TEST TOP DRIVE(GOOD). 22:30 - 00:00 1.50 I DRILL N RREP 1,860.0 SURF MU BHA#3 PER SLB DDT/83'MD -PJSM -BIT,MOTOR,ARC,STABILZER,AND MWD. -RERAN BIT 7/21/2013 00:00 - 01:00 1.00 DRILL N RREP 1,860.0 SURF CONT TO MU BHA#3 PER SLB DD. i-SHALLOW HOLE TEST MWD TOOLS(GOOD) '01:00 - 03:00 2.00 DRILL N RREP 1,860.0 SURF RIH ON ELEVATORS 03:00 - 03:30 0.50 DRILL P SURF ESTABLISH CIRCULATION,WASH F/1,736'TO 1,860' NO FILL. 03:30 - 11:00 7.50 DRILL P SURF DRILL 121/4"SURFACE HOLE F/1,860'MD TO 2,635'MD(2,630'ND) -650 GPM,2120 PSI ON,2000 PSI OFF -80RPM,5K TQ ON/3K TQ OFF,12K WOB -P/U=106K,S/O=100K,ROT=103 K -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -AST=.63,ART=3.08,ADT=3.71 -TOTAL BIT HRS=9.5,TOTAL JAR HRS=9.5 HRS. 11:00 - 12:30 1.50 DRILL P SURF CBU 3X WHILE RECIPROCATING 90' STROKES. -650 GPM,2000 PSI. -60 RPM,2K TQ -MONITOR WELL FOR 10 MIN(STATIC) 12:30 - 14:00 1.50 DRILL P SURF POOH ON ELEVATORS -20K OVERPULL ENCOUNTERED AT 2,335' MD. -OVERPULL ENCOUNTERED AT 1,510'MD -DECISION TO RUN BACK TO BOTTOM. 14:00 - 14:30 0.50 DRILL P SURF RIH ON ELEVATORS F/1,510'MD T/2,013'MD -TAKING WEIGHT 14:30 - 16:00 1.50 DRILL P SURF WASH TO BOTTOM F/2,013 T/2,635'MD. -650 GPM,.1990 PSI ON j-80 RPM,2-3K TQ_ 16:00 - 16:30 0.50 DRILL P SURF CBU 2X. -650 GPM,1990 PSI -P/U=106K,S/O=100K -MONITOR WELL FOR 10 MIN(STATIC) 16:30 - 18:30 2.00 DRILL P SURF POOH ON ELEVATORS F/2,635'MDT/300'MD -NO TIGHT SPOTS ENCOUNTERED -WELL TAKING CALCULATED FILL. 18:30 - 21:30 3.00 DRILL P SURF UD BHA#3 PER SLB DD. -PJSM -BIT GRADE:2-3-CT-A-E-2-WT-TD 21:30 - 22:00 0.50 DRILL P SURF CLEAN AND CLEAR RIG FLOOR. 22:00 - 23:00 1.00 CASING P SURF PERFORM DUMMY RUN W/CASING HANGER. 23:00 - 00:00 1.00 CASING P SURF RU TO 9-5/8",40#,L-80,BTC CASING -RU VOLANT CRT -RU LONG BAILS.SLIP INSERTS,BAKER CEMENT SWIVEL. -MU 9-5/8"XO AND FOSV. 7/22/2013 00:00 - 00:30 0.50 CASING P SURF RU 9-5/8"SURFACE CASING RUNNING EQUIPMENT Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 5 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UW: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:30 - 01:00 0.50 CASING P SURF MU 9-5/8"SHOE TRACK T/86'MD -PJSM -BAKERLOK SHOE TRACK CHECK FLOATS(GOOD) 01:00 - 06:00 5.00 CASING P SURF 'RUN 9-5/8",40#,L-80, BTC SURFACE CASING T/2,077'MD BEST OF LIFE 2000 PIPE DOPE. -TQ CONNECTIONS TO 11K TQ RUN 3 CENTRALIZERS LOCKED DOWN ON SHOE JOINTS. -RUN 25 FREE FLOATING CENTRALIZERS 'ABOVE SHOE. BREAK CIRCULATION EVERY 10 JOINTS FILLING EVERY JOINT -PRECAUTIONARY CBU @ 1,246'W/5 BPM, 100 PSI -MUD WEIGHT:9.2 PPG IN/9.2 PPG OUT -CBU 1X AT 1,024'MD -5 BPM,100 PSI -CONT RUNNING 9-5/8'CASING TO 2,077'MD 06:00 - 06:30 0.50 CASING P SURF CBU 1X WHILE RECIPROCATING F/2,036'MD T/2,077'MD. -210 GPM,160 PSI -P/U WT=86K,S/O WT=81K WT 06:30 - 08:30 2.00 CASING P SURF MU TAM PORT COLLAR PER PESI REP -CONT RIH F/2,077'TO 2,580' 08:30 - 09:30 1.00 CASING P SURF MU FLUTED MANDREL HANGER AND LANDING JOINT BREAK CIRCULATION WASH DOWN CASING LAND CASING HANGER 09:30 - 13:00 3.50 CASING P SURF CIRCULATE AND CONDITION MUD STAGING PUMPS -420 GPM,245 PSI -FCP=160 PSI Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 6 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date. X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 17:30 4.50 CEMT P SURF CEMENT 9-5/8"SURFACE CASING AS FOLLOWS: PJSM W/WSL,SUPERINTENDENT,SLB,DDI, !AND CH2MHILL. H PRESSURE TEST SURFACE CEMENTING LINES TO 250 PSI LOW/4,000 PSI HIGH. (GOOD) -PUMP 100 BBLS OF 10 PPG MUDPUSH II • SPACER @ 5 BPM,155 PSI -RELEASE BOTTOM PLUG PUMP 615 BBLS OF 11 PPG LITECRETE LEAD CEMENT @ 5 BPM,(YIELD 1.91_ CU.FT/SK) -PUMP 65 BBLS OF 15.8 PPG CLASS G TAIL @ 5 BPM(YIELD 1.16 CU.FT/SK) -DROP TOP PLUG -KICK OUT TOP PLUG WITH 10 BBLS H2O PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.3 PPG DRILPLEX MUD PER SLB CADE. 1- DISPLACE WITH 183 BBLS OF 9.3 PPG DRILPLEX AT 10 BPM -CAUGHT UP TO PLUG IN 177.5 BBLS REDUCE RATE TO 6 BPM. -REDUCE RATE TO 2 BPM,600 PSI PRIOR TO PLUG BUMP -PLUG BUMPED ON STROKES -HOLD 500 PSI OVER PUMP PRESSURE T/ 1100 PSI. -CHECK FLOATS(FLOATS HELD) -TOTAL DISPLACEMENT VOLUME 183.7 BBLS 1825 STKS,ACTUAL PUMP EFFICIENCY= • 96%) -CEMENT IN PLACE @ 17:25 HRS -LOST 15 BBLS DURING CEMENT JOB AND DISPLACEMENT. -RECOVERED 366-BBLS.CEMENT TO SURFACE, 17:30 - 19:30 2.00 ' CASING P SURF RD CEMENTERS AND CASING RUNNING EQUIPMENT 19:30 - 00:00 4.50 CASING P SURF NIPPLE DOWN SURFACE ANNULAR,RISER AND DIVERTER TO REMOVE DIVERTER LINE. CLEAN OUT CEMENT MANIFOLD VALVES. 7/23/2013 00:00 - 06:00 6.00 CASING P SURF N/U BOPE -INSTALL DSA,SPACER SPOOL,RISER,BOP STACK -CONNECT CHOKE AND KILL LINES 06:00 - 07:30 1.50 CASING P SURF FINISH N/U OF BOPE AND R/U TEST EQUIPMENT INSTALL FLOW LINE AND HOLE FILL LINE, FLOW BOX AND SEAL,FLOW NIPPLE.ALL CONNECTIONS TORQUED. SET TEST PLUG. 07:30 - 11:30 4.00 CASING P SURF TEST BOPE TO 250 PSI LOW,3,500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 4"TEST JOINT -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WITNESSED WAIVED BY AOGCC REP • Printed 8/19/2013 10:32:26AM • North America-ALASKA-BP Page 7 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date 7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad _L_- - - Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL(§77.1ft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 14:00 2.50 CASING P SURF R/D TESTING EQUIPMENT,PULL TEST PLUG &SET 9-3/4"WEAR BUSHING -C/O SAVER SUB,REPLACE GRABBER DIES -CLEAN AND CLEAR RIG FLOOR 14:00 - 15:30 1.50 CASING P SURF PRESSURE TEST 9-5/8"40#,L-80 SURFACE CASING TO 250 LOW FOR 5 MIN/3,500 PSI FOR 30 MIN EACH -TEST APPROVED BY BP WTL JIM WILLINGHAM -R/D CASING TEST EQUIPMENT 15:30 - 00:00 8.50 CASING P SURF DRILL PIPE MANAGEMENT -PU SUFFICIENT 4"DP TO TD INTERMEDIATE HOLE SECTION. 7/24/2013 06:00 - 08:00 2.00 CASING P SURF CONT TIH F/960'MD TO 2,353'MD -SLIP&CUT DRILL LINE -CALIBRATE BLOCKS WITH SLB AND AMPHION 00:00 - 02:00 2.00 CASING P SURF DRILL PIPE MANAGEMENT -PU SUFFICIENT 4"DP TO TD INTERMEDIATE • HOLE SECTION. 02:00 - 04:00 2.00 CASING P SURF PJSM FOR PICKING UP BHA -PU BHA#4 PER SLB(DD)TO 664'MD ,- C/O SLIP INSERTS 04:00 - 06:00 2.00 CASING P - SURF P/U DOUBLES FROM PIPE SHED FROM 664' MDTO960'MD -MONITOR DISPLACEMENT VIA THE TRIP TANK -SHALLOW HOLE TEST AT 960'W/425 GPM, 1100 PSI-GOOD TEST 08:00 - 08:30 0.50 CASING P SURF SERVICE AND INSPECT TOP DRIVE 08:30 - 10:00 1.50 CASING P SURF CLEAN OUT CEMENT SHOE TRACK TO WITHIN 10'OF THE 9-5/8"SHOE TO 2,614' -TAG CEMENT STRINGER AT 2,525' -TAGGED FLOAT COLLAR ON DEPTH AT 2,535' -500 GPM,2050 PSI,34%FLOW OUT,40 RPM, 4 FT-KLBS TORQUE 10:00 - 11:30 1.50 CASING P SURF DISPLACE WELL TO 9.2 PPG LSND -TAKE SPR'S 0)2,607'MD,2,603'TVD, MW-9.2 PPG 11:30 - 12:30 1.00 CASING P SURF ,CLEAN OUT SHOE TRACK AND DRILL 20'OF NEW FORMATION TO 2,655' -496 GPM,1380 PSI ON 1340 PSI OFF -40 RPM,5 FT-KLBS TORQUE ON,4 FT-KLBS TORQUE OFF,5 KLBS WOB -PU 110 KLBS,SO 93 KLBS,ROT 94 KLBS 12:30 - 13:00 0.50 CASING P SURF MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:9.2 PPG IN,9.2 PPG OUT 13:00 - 14:30 1.50 DRILL P INTI PERFORM LOT AT 2,625'MD,2,620'TVD -MW9.2PPG -SUCCESSFUL LOT TO 14.42 PPG EMW(710 PSI), (>50 BBL KICK TOLERANCE) -PUMPED 4.8 BBLS TO REACH LOT,BLED BACK 4 BBLS -ONLY NEED ODE APPROVAL TO PROCEED, RECEIVED APPROVAL FROM WTL Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 8 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 1 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 00:00 9.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE F/2,655' MD TO 3,876'MD(3,871'TVD) -602 GPM,2325 PSI ON, -80 RPM,4-5 FT-KLBS TORQUE ON,4 FT-KLBS TORQUE OFF,4 KLBS WOB ECD 9.66 PPG -SURVEY EVERY 100 FT 1-ACTUAL ROTATING TIME=2.95 HRS ACTUAL SLIDE TIME=1.07 HRS -TOT BIT HRS=4.02 -TOTAL JAR HRS=13.6 -BACKREAM EVERY STAND PRIOR TO CONNECTIONS -MUD WEIGHT:9.2 PPG IN,9.2 PPG OUT -HI-VIS SWEEP EVERY 500' PUMPED 50 BBL SUPER SWEEP PILL AT 550 GPM,1800 PSI NO NOTICEABLE INCREASES IN CUTTINGS RETURNS • 7/25/2013 00:00 - 12:00 12.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE F/3,876' MD TO 5,681'MD 5,058 TVD -602 GPM,2785 PSI ON, -80 RPM,4-5 FT-KLBS TORQUE ON,8 FT-KLBS TORQUE OFF,8 KLBS WOB -ECD 9.66 PPG -SURVEY EVERY 100 FT -BACKREAM EVERY STAND PRIOR TO 1 CONNECTIONS MUD WEIGHT:9.2 PPG IN,9.2 PPG OUT -PUMPED 50 BBLS SUPER SWEEP-SAW NO NOTICEABLE INCREASE IN CUTTING RETURNS 12:00 - 00:00 12.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE F/5,681' MD TO 7,106'MD 5,849'TVD -602 GPM,3308 PSI ON,3004 PSI OFF -80 RPM,6-8 FT-KLBS TORQUE ON,5 FT-KLBS TORQUE OFF,8 KLBS WOB -ECD 9.76 PPG -SURVEY EVERY 100 FT -ACTUAL ROTATING TIME=8.42 HRS -ACTUAL SLIDE TIME=3.72 HRS -TOT BIT HRS=16.16 -TOTAL JAR HRS=25.8 -BACKREAM EVERY STAND PRIOR TO CONNECTIONS -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -PUMPED 50 BBLS SUPER SWEEP-SAW NO NOTICEABLE INCREASE IN CUTTING RETURNS 7/26/2013 00:00 - 09:30 9.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 7,106'MD TO 7,867'MD(6,431'TVD) -602 GPM,4080 PSI ON,3830 PSI OFF -120 RPM,BK TORQUE ON,6K TORQUE OFF, 10K WOB -PU=168K,SO=133K,ROT=145K -ECD 11.38 PPG -SURVEY EVERY 100 FT -BACKREAM EVERY STAND PRIOR TO CONNECTIONS -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT Printed 8/19/2013 10:32:26AM • • NorthAmerica-ALASKA-BP y ' �� �,. Page 9 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: 'X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30.00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:30 - 10:30 1.00 DRILL P INTI 1 CBU WHILE ROT&RECIP FROM 7,772'MD TO 7,867'MD -400 GPM,2000 PSI 4-80 RPM,5K TQ 10:30 - 19:00 8.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 7,867'MD TO 8,057'MD(6,595'TVD) 1-585 GPM,4030 PSI ON,3730 PSI OFF -120 RPM,9K TORQUE ON,6K TORQUE OFF, 10K WOB PU=169K,SO=134K,ROT=145K ECD 11.41 PPG SURVEY EVERY 100 FT -ACTUAL ROTATE TIME=2.59 HRS -ACTUAL SLIDE TIME=3.29 HRS -ACTUAL DRILLING TIME=5.88 HRS -BACKREAM EVERY STAND PRIOR TO CONNECTIONS -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT 19:00 - 20:00 1.00 DRILL P INTI CBU WHILE ROTATE&RECIPROCATE -380 GPM,1990 PSI,100 RPM,7K TQ -C/O#2 MUD PUMP PULSATION DAMPNER 20:00 - 00:00 4.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 8,057'MD TO 8,750'MD 7,221'TVD -525 GPM,3770 PSI ON,3560 PSI OFF -120 RPM,8-9K TORQUE ON,6K TORQUE OFF,10-15K WOB -PU=196K,SO=139K,ROT=162K -ECD 11.47 PPG -SURVEY EVERY 100 FT -ACTUAL ROTATE TIME=2.37 HRS -ACTUAL SLIDE TIME=3.39 HRS -ACTUAL DRILLING TIME=5.76 HRS -BACKREAM EVERY STAND PRIOR TO CONNECTIONS -MUD WEIGHT:10.4 PPG IN,10.4 PPG OUT 7/27/2013 00:00 - 12:00 12.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 8,750'MD TO 9,672'MD 8,045'TVD -539 GPM,4100 PSI ON,3810 PSI OFF -120 RPM,10K TORQUE ON,9K TORQUE OFF,10K WOB -PU=210K,SO=144K, ROT=176K -ECD 11.54 PPG -SURVEY EVERY 100 FT -BACKREAM EVERY STAND PRIOR TO CONNECTIONS -MUD WEIGHT:10.4 PPG IN,10.4 PPG OUT 12:00 - 00:00 12.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 9,672'MD TO(TD)@ 10,266'MD 8,582'TVD -500 GPM,3740 PSI ON,3525 PSI OFF -120 RPM,11K TORQUE ON,8 K TORQUE OFF, 9K WOB -PU=223K,SO=152 K,ROT=173 K -ECD 11.34 PPG -SURVEY EVERY 100 FT -ACTUAL ROTATE TIME=5.55 HRS -ACTUAL SLIDE TIME=2.04 HRS -ACTUAL DRILLING TIME=7.59 HRS -BACKREAM EVERY STAND PRIOR TO CONNECTIONS -MUD WEIGHT:10.4 PPG IN,10.4 PPG OUT TSAG PICKED BY GEOLOGY @ 10,256' Printed 8/19/2013 10:32:26AM • North America-ALASKA-BP Page 10 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase I Description of Operations 7/28/2013 23:00 - 00:00 1.00 DRILL P (ft) INTI PJSM FOR LAYING DOWN BHA LAYDOWN BHA AS DIRECTED BY SLB DD 00:00 - 03:00 3.00 DRILL P INTI ROTATE AND RECIPROCATE FROM 10,266 MD TO 10,172'MD -CBU X 3, 550 GPM,4075 PSI,120 RPM,11-12 FT-KLBS TORQUE -PUMP 40 BBL HIGH VIS SWEEP AT TD,NO SIGNIFICANT INCREASE IN RETURNS -1/4"KINGAK SHALE CUTTINGS&MINIMAL CLAY BALLS -CALCULATED ECD 11.08,ACTUAL ECD 11.18 SPR'S AT 10,266'MD(8,582'TVD),TIME 02:15, MW 10.4 PPG #1 MP-20/30 SPM=320/440 PSI #2 MP-20/30 SPM=310/420 PSI '03:00 - 03:30 0.50 I DRILL P INTI I 10 MIN FLOW CHECK BEFORE PULLING OFF I BOTTOM. -STATIC LOSS RATE LESS THAN 1 BPH PUW-226K,SOW-137K,ROT-180K 03:30 - 05:30 2.00 DRILL P INTI WIPER TRIP: -PUMP OUT OF THE HOLE @ 100 FT/MIN FROM 10,266'MD TO 8,439'MD -2 BPM,250 PSI -P/U=226K,S/O=152K,ROT WT=180K,10K TQ 05:30 - 08:00 2.50 DRILL P INTI POOH ON ELEVATORS FROM 8,439'MD TO 6,254'MD MONITOR DISP VIA TRIP TANK P/U=185K,S/O=135K 08:00 - 09:30 1.50 DRILL P INTI 10 MIN FLOW CHECK BEFORE RUNNING BACK TO BOTTOM -STATIC RIH ON ELEVATORS ON 4"DP F/DERRICK - FROM 6,254'MD TO 10,149'MD -MONITOR DISP VIA TRIP TANK -FILL PIPE AT 8,249'MD -WASH&REAM FROM 10,149'MD TO 10,266' MD(LAST STAND) -STAG PUMPS TO 400 GPM 09:30 - 11:30 2.00 DRILL P INTI CBU X2 WHILE ROT&RECIP FROM 10,173' MD TO 10,266'MD -530 GPM,4000 PSI 1-120 RPM,8-9KTQ -HIGH INCREASE OF CUTTINGS AT 4500 STROKES INTO BOTTOMS UP 11:30 - 13:00 1.50 DRILL P INTI ROT&RECIP FROM 10,054'MD TO 10,149'MD -551 GPM,3850 PSI 120 RPM,7K TQ 13:00 - 15:30 2.50 DRILL P INTI PUMP OF OUT HOLE FROM 10,054'MD TO 8,630'MD -85 GPM,450 PSI P/U=191K,S/O=137K 15:30 - 17:00 1.50 DRILL P INTI POOH ON ELEVATORS FROM 8,630'MD TO 16,250'MD -MONITOR HOLE FILL ON TRIP TANK -P/U=140K,S/O=118K •-NO TIGHT SPOTS ENCOUNTERED 17:00 - 17:30 0.50 DRILL P INTI ROTATE AND RECIPROCATE WHILE CBU: WITH GHOST REAMER AT THE SHOE -550 GPM,3053 PSI,100 RPM,3K TQ -PUW-140K,SOW-118K,ROT-126K Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 11 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-01360-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL©77.1ft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:30 - 20:00 2.50 DRILL P INTI POOH ON ELEVATORS FROM 6,250'MD TO 2,543'MD -MONITOR HOLE FILL ON TRIP TANK -P/U=94K,5/0=96K -NO TIGHT SPOTS ENCOUNTERED -LD THE GHOST REAMER-1/16"UNDER GUAGE 20:00 - 20:30 0.50 DRILL P INTI ROTATE AND RECIPROCATE WHILE CBU: -550 GPM,2078 PSI,100 RPM, -PUW-94K,SOW-96K,ROT-92K -SAWA SIGNIFICANT INCREASE IN CUTTINGS AND CLAY BALLS WITH BOTTOMS UP.SHAKERS CLEANED UP QUICKLY AFTER UNLOADING. 20:30 - 21:30 1.00 DRILL P INTI SLIP&CUT 72'OF DRILLING LINE -CALIBRATE BLOCK HEIGHT&AMPHION -MONITOR WELL-WELL STATIC 21:30 - 22:00 0.50 DRILL P INTI RIG SERVICE: _ -TD&BLOCKS 22:00 - 23:00 1.00 DRILL P INTI POOH ON ELEVATORS F/2,543'MD TO 740' -MONITOR TRIP VIA THE TRIP TANK -FLOW CHECK WELL PRIOR TO PULLING BHA WELL STATIC 7/29/2013 00:00 - 01:00 1.00 DRILL P INTI FINISH LAYING DOWN INTERMEDIATE DRILLING BHA - OUT OF THE HOLE AT 01:00 - BIT GRADE:2-3-CT-A-X-1-BT-TD, -GHOSTREAMER 1/16"UNDER GAUGE -IN LINE STAB-IN GAUGE 01:00 - 02:00 1.00 DRILL P INTI DRAIN STACK,PULL WEAR BUSHING, -INSTALL TEST PLUG,CLEAN AND CLEAR RIG FLOOR 02:00 - 03:00 1.00 BOPSUR P INTI C/O UPPER VBR'S FROM 2-7/8"X 5-1/2" TO 7" CASING RAMS RU TO RUN 7",26#,L-80,VTHC CASING -RU LONG BAILS AND EXTENSIONS, 03:00 - 04:00 1.00 BOPSUR P INTI PU 7"TEST JOINT,RU TEST EQUIPMENT -TEST RAMS TO 250 LOW/3500 HIGH FOR 5/5 CHARTED MIN EACH(PASS) -UPLOAD TEST CHART TO OPENWELLS 04:00 - 05:00 1.00 CASING P INTI MU&TORQUE DOYON VOLANT CRT-TOT LENGTH 11.4 P/U 7"FMC MANDREL AND PERFORM DUMMY RUN -REMOVE HANGER FROM LANDING JOINT AND LEAVE ON FLOOR 05:00 - 12:00 7.00 CASING P ' INTI PJSM TO RUN 7"CASING MU SHOE TRACK -BAKERLOCK CONNECTION UP TO LANDING COLLAR -CHECK FLOATS(GOOD) RUN 7",26#,L-80,VAMTOP HC CASING TO 2,580'MD -TORQUE CONNECTIONS TO 11,950 FT-LBS -FILL CASING EVERY 10 JOINTS -UD JOINTS#13&#14 Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 12 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 12:30 0.50 CASING P INTI CIRCULATE BOTTOMS UP PRIOR TO ENTERING OPEN HOLE -STAGE PUMPS UP FROM 126.0-GPM UP TO 294.0-GPM -MW IN=10.4-PPG,MW OUT=10.7 -CIRCULATE TO 10.4PPG IN,10.4-PPG OUT -ICP-250 PSI,FCP-547 12:30 - 17:00 4.50 CASING P INTI RIH W/7"26#VT HC INTERMEDIATE CASING F/2,580'MD TO 4,966' -FILL& BREAK CIRCULATION EVERY 10 JNTS, -MONITORING DISPLACEMENT VIA PITS 2-3 17:00 - 17:30 0.50 CASING P INTI CBU AT 4,966'MD 211 GPM,430 PSI -INITIAL MW OUT=10.9-PPG -CIRCULATE TO 10.4-PPG MW IN,10.4-PPG ,MW OUT 17:30 - 23:30 6.00 CASING P INTI RIH W/7"26#VT HC INTERMEDIATE CASING F/4,966'MD TO 8,240'MD -FILL& BREAK CIRCULATION EVERY 10 JNTS, -MONITORING DISPLACEMENT VIA PITS 2-3 23:30 - 00:00 0.50 CASING P INTI CBU AT 8,240'MD,ABOVE THE HRZ -211 GPM,650 PSI INITIAL MW OUT=10.9-PPG -CIRCULATE TO 10.4-PPG MW IN,10.4-PPG MW OUT 7/30/2013 00:00 - 05:00 5.00 CASING P INTI I RIH W/7"26#VT HC INTERMEDIATE CASING F/ 8,240'MD TO 10,259'MD -7"CASING SET AT 10,259 FT WITH FC AT 10,174 FT. -FILL& BREAK CIRCULATION EVERY 10 JNTS, -MONITORING DISPLACEMENT VIA PITS 2-3 -PU FMC FLUTED MANDREL HANGER& CIRCULATE DOWN AT 3 BPM -VERIFY HANGER LANDING BY TAG MARK FROM DUMMY RUN. 05.00 - 08:30 3.50 CASING P INTI CONDITION 10.4 LSND MUD WHILE RECIPROCATING CASING SOME LOSSES OBSERVED WHILE CIRCULATING -STAGE PUMP FROM 3.0-BPM AT 640 PSI TO 8.0-BPM AT 1085 PSI. -NOTED LOSSES OF 12 BPI-I. -SLOW PUMP TO 6 BPM AND LOSSES DROPPED TO 6 BPH Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 13 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:OOPM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 11:30 3.00 CEMT P INTI CEMENT 7"INTERMEDIATE CASING WTH SLB. -PRESSURE TEST LINES 250/4500 PSI FOR 5 CHARTED MINUTES. -PUMP 30 BBL OF 12.0 PPG MUD PUSH II AT 5 BPM. -RELEASE BOTTOM PLUG. -PUMP 55.4 BBL OF 15.8 PPG CLASS G TAIL CEMENT AT 5.0 BPM,30%EXCESS,1.17 FT3/SK. -DROP TOP PLUG. -DISPLACE WITH 10 BBL WATER AND SWAP TO RIG PUMP. -DISPLACE WITH 379.6 BBL 10.4 PPG LSND MUD AT 6.0 BPM. (3770 STROKES AT 0.1007 BPS). -REDUCE RATE TO 2.0 BPM AND 950 PSI. -BUMP PLUG AND INCREASE PRESSURE TO 1450 PSI AND HOLD 5 MINUTES. -CHECK FLOATS-OK. -TOTAL DISPLACEMENT=389.6 BBL -RECIPROCATE PIPE 2 FT,KEEPING SHOE IN SAG. -CIP AT 11:12 AM 7-30-13. .*TOC ESTIMATED AT 9310 FT VERIFIED WITH LIFT PRESSURE METHOD FOR TOC EVALUATION. 11:30 - 12:30 1.00 CEMT P INTI PRESSURE TEST 7"CASING. -250 PSI FOR 5 CHARTED MINUTES-OK. -3500 PSI FOR 30 CHARTED MINUTES-OK. 12:30 - 13:00 0.50 CEMT P INTI INJECT 10.4 PPG LSND DOWN OA. -ICP=445 PSI AT 0.5 BPM. !-BROKE OVER AT 4.0 BBL FOR 1.5 BBL. -FCP 433 PSI AT 0.5 BPM. 13:00 - 14:00 1.00 ' CEMT P INTI RIG DOWN CASING AND CEMENT EQUPMENT. -BLOW DOWN LINES. -CLEAN CEMENT VALVES ON MUD MANIFOLD. 14:00 - 15:00 1.00 WHSUR P INTI INSTALL 7"PACKOFF W/FMC. -TEST 250 PSI FOR 5 CHARTED MINUTES-OK. -TEST 5000 PSI FOR 30 CHARTED MINUTES-OK. • 15:00 - 15:30 0.50 WHSUR P INTI CLEAN AND CLEAR RIG FLOOR. 15:30 - 16:30 1.00 BOPSUR P INTI CHANGE OUT UPPER RAMS. -FROM 7"SOLID BODY. -TO 2-7/8"X 5-1/2"VBR. 16:30 - 17:00 0.50 BOPSUR P INTI TEST UPPER RAMS. -INSTALL TEST PLUG. 'I -TEST 250/3500 PSI FOR 5 CHARTED MINUTES-OK. 17:00 - 17:30 0.50 WHSUR P INTI INSTALL WEAR RING. -PULL TEST PLUG -INSTALL 7-1/16"ID WEAR RING. 17:30 - 18:00 0.50 CEMT P INTI INJECT DOWN OA. -PRESSURE TEST LINES TO 2000 PSI-OK. -INJECT 2.0 BBLS AT 0.5 BPM WITH FCP=200 PSI. Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 14 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs 1 Task Code NPT 1 NPT Depth 1 Phase I Description of Operations (hr) (ft) 18:00 - 21:00 3.00 DRILL P INTI PICK UP BHA#5. -6-1/8"INSERT BIT,4.75"PDM AT 1.5 DEG AND ADN LWD. -PJSM AND INSTALL TWO RA SOURCES. -PULSE TEST MWD. 'SIM OP: INJECT 1.0 BBL DOWN OAAT 0.5 BPM WITH FCP=200 PSI. 21:00 - 22:00 1.00 DRILL P INTI 'TIH WITH BHA FROM 475 TO 1330 FT. -PICK UP DOUBLES FROM PIPE SHED. 22:00 - 23:00 1.00 DRILL P • INTI KICK WHILE TRIPPING DRILL. -HELD WITH WELL CONTROL ASSESSOR. -CRT 1:35 -AAR. 23:00 - 00:00 1.00 DRILL P INTI PICKING UP DOUBLES FROM PIPE SHED, CONT. 1-FROM 1330 TO 1520 FT. 7/31/2013 00:00 - 00:30 0.50 DRILL P INTI RIG AND TOP DRIVE SERVICE. •00:30 - 06:00 5.50 DRILL P INTI TRIP IN HOLE WITH BHA#5. -6-1/8"INSERT BIT,4.75"PDM AT 1.5 DEG, ADN LWD. -RUN STANDS FROM DERRICK. -FROM 1520 TO 10,060 FT. •*SIM OP: INJECT 3.0 BBL LSND DOWN OAAT 1.0 BPM WITH BREAKOVER AT 650 PSI. *-FREEZE PROTECT OA WITH 62 BBL DIESEL AT 1.5 BPM WITH FCP=850 PSI. 06:00 - 07:00 1.00 DRILL P INTI WASH AND REAM CEMENT INSIDE 7"CASING. -FROM 10,068 TO 10,174 FT. -226 GPM AT 2140 PSI. -TAG TOP PLUG AT 10.174 FT. -DRILL PLUGS AND SHOE TRACK: 10,174 TO 10,245 FT WITH SHOE AT 10,259 FT. -40 RPM WITH 11K TORQUE AND 5K WOB. -PU 230K,SO 130K,ROT 155K W/8K TORQUE. 07:00 - 09:00 2.00 DRILL P INTI CHANGE OVER MUD SYSTEM FROM LSND TO POWER PRO. -CIRCULATE BOTTOMS UP WITH 2200 STROKES. -PUMP 57BBL STEEL LUBE PILL,25 BBL HIGH VISC SPACER AND 28 BBL WATER. 1-DISPLACE WELL WITH 8.5 PPG POWER PRO 1 MUD. -ICP: 248 GPM AT 2200 PSI. -80 RPM WITH 12K TORQUE. -FCP: 248GPM AT 1330 PSI. -DUMP STEEL LUBE TO CUTTINGS TANK. 09:00 - 10:00 1.00 DRILL P INTI DRILL REMAINDER OF SHOE TRACK. -FROM 10,245 TO 10,259 FT(CASING SHOE). -REAM: 10,259 TO 10,266 FT(TD OF 8-3/4" HOLE). -DRILL 20 FT OF NEW HOLE: 10,266 TO 10,286 IFT. Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 15 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:OOPM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL©77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 12:00 2.00 DRILL P PROD1 FORMATION INTEGRITY TEST TO 10.5 PPG • EMW. -CIRCULATE BOTTOMS UP WHILE RECIPROCATING PIPE. -RIG UP TEST EQUIPMENT. -MUD WEIGHT=8.5 PPG AND TVD=8576 FT. -CALCULATED PRESSURE=890 PSI. -CLOSE ANNULAR. -PRESSURE TO 905 PSI WITH 1.2 BBL. '-HOLD FOR 10 MINUTES WITH FINAL PRESSURE AT 870 PSI. -BLEED BACK 1.3 BBL. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE. -FROM 10.286 FT TO 10635 FT,8865 TVD. -249 GPM WITH 1480 PSI ON AND 1378 OFF. -50 RPM WITH 5K TORQUE ON AND 4K OFF. -PU 195K,SO 161K,ROT 171K -SURVEY EVERY 30 FT. -SLIDE HOURS: 5.0 -ROTATE HOURS: 3.79 HR -BIT HOURS: 8.79 -MW=8.6 IN/OUT 8/1/2013 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE. -FROM 10,635 TO 10,890 FT,9030 TVD. -249 GPM AT 1520 PSI ON AND 1390 PSI OFF. -50 RPM AT 5-7K TORQUE WITH 20K WOB. -PU 201 K,SO 157K,ROT 170K WITH 5K TORQUE. -SLIDE HOURS=3.93 !-ROTATE HOURS=1.04 -TOTAL DRILL HOURS TOUR: 4.97 -TOTAL BIT HOURS: 13.12 -25 BBL HI-VISC SWEEP AT 10,730 AND NUT PLUG SWEEP AT 10,820 FT. —BOTH PUMPED DUE TO LOW ROP AND ROP INCREASED AFTER EACH. -FLUID LOSS TO WELL FOR 12 HOURS=0. 112:00 - 00:00 12.00 DRILL P PROD1 DRILL6-1/8"PRODUCTION HOLE. -FROM 10,890 TO 11,184 FT,9106 TVD. -249 GPM AT 1560 ON AND 1480 OFF. -PU 200K,SO 160K,ROT 173 WITH 4K TORQUE. -SLIDE HOURS: 4.57 -ROTATE HOURS: 1.37 -TOTAL DRILL HOURS FOR TOUR: 5.94 -TOTAL DRILL HOURS FOR DAY: 10.91 -TOTAL BIT HOURS: 19.06 -30 BBL HI-VISC SWEEP AT 11,020 FT DUE TO WEIGHT STACKING DURING SLIDING. IMPROVED POST SWEEP. Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 16 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 1 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:OOPM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/2/2013 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6-1/Er PRODUCTION HOLE. -FROM 11,184 TO 11,648 FT. -249 GPM WITH 1625 PSI ON AND 1500 PSI OFF. -50 RPM WITH 4K TORQUE. -12 TO 15K WOB. -PU 196K,SO 147K,ROT 167K WITH 4K :TORQUE. -SLIDE HOURS: 3.98 ROTATE HOURS: 2.88 -DRILLING HOURS FOR TOUR: 6.86 -TOTAL BIT HOURS: 25.92 -PUMP HI-VISC SWEEP AT 11,385 FT DUE TO WEIGHT STACKING. IMPROVED POST SWEEP. —FINE SAND RETURNED TO SURFACE. -FLUID LOSS FOR TOUR: 0 BBL. 112:00 - 17:00 5.00 I DRILL P PROD1 DRILL6-1/8"PRODUCTION HOLE. -FROM 11,648 TO 11,770 FT. -249 GPM WITH 1625 PSI ON AND 1520 PSI OFF. -50 RPM WITH 5K TORQUE. 17K WOB. •-PU 196K,SO 147K,ROT 167K WITH 4K TORQUE. -SLIDE HOURS: 1.04 ROTATE HOURS: 2.58 -DRILLING HOURS FOR TOUR: 3.62 -DRILLING HOURS FOR DAY: 10.68 -TOTAL BIT HOURS: 29.21 17:00 - 19:30 2.50 DRILL P PROD1 CIRCULATE OUT FOR BIT TRIP. (BIT HOURS). -CIRCULATE 3 BOTTOMS UP,800 BBL. -RECIPROCATE: 11,683 TO 11,770 FT. -250 GPM AT 1537 PSI. -50 RPM WITH 4K TORQUE. -RACK BACK#119. -CIRCULATE AND RECIPROCATE: 11,558 TO 11,683 FT. -VERY LITTLE SAND RETURNING TO SURFACE AT END OF CIRCULATION. SURVEY AND SPR'S. -10 MINUTE FLOW CHECK-STATIC. 19:30 - 22:00 2.50 DRILL P PROD1 BACK REAM OUT OF HOLE TO 7"CASING SHOE. -60 FPM. -250 GPM AT 1500 PSI. -50 RPM WITH 4K TORQUE. -HOLE TAKING CALCULATED FILL. 22:00 - 23:30 1.50 DRILL P PROD1 CIRCULATE AT 7"CASING SHOE. -CIRCULATE 1 BOTTOMS UP,233 BBL. -RECIPROCATE: 10,163 TO 10,251 FT. -250 GPM AT 1387 PSI. -50 RPM. -PU 187K,SO 150K, ROT 160K WITH 3K TORQUE. -10 MINUTE FLOW CHECK-STATIC. -PUMP DRY JOB. • 23:30 - 00:00 0.50 DRILL P PROD1 TRIP OUT OF HOLE FROM 7"CASING SHOE ON ELEVATORS. -FROM 10,251 TO 8,643 FT. -200 FPM. -PU 167 AND SO 140K. Printed 8/19/2013 10:32:26AM NorthAmerica-ALASKA-BP Page 17 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL©77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/3/2013 00:00 - 04:00 4.00 DRILL P PROD1 TRIP OUT OF HOLE ON ELEVATORS,CONT. -FROM 8,643 TO BHA. -10 MINUTE FLOW CHECK-STATIC. • 104:00 - 06:00 2.00 DRILL P PROD1 HANDLE PRODUCTION DRILLING BHA#5. -PJSM AND REMOVE(2)RA SOURCES. -LAYDOWN MOTOR AND BREAK BIT. -CLEAN AND CLEAR RIG FLOOR. BIT#5 GRADE:3-5-WT-A-E-4-LT-HR. 06:00 - 07:00 1.00 WHSUR P PROD1 PULL WEAR RING. -DRAIN STACK. -PULL WEAR RING. -INSTALL TEST PLUG. 07:00 - 11:30 4.50 BOPSUR P PROD1 I TEST BOPE. -250/3500 PSI FOR 5 CHARTED MINUTES. '-ANNULAR WITH 2-7/8"TEST JOINT. -UPPER AND LOWER VBR WITH 2-7/8"AND I4-1/2"TEST JOINTS. -TEST CHOKES VALVES#1-15. -CHOKE AND KILL MANUAL VALVES AND HCR. -DART,FLOOR VALVES AND TOP DRIVE VAVLES. -ATTEMPT TO TEST TOP DRIVE IBOP AND FAIL. -ACCUMULATOR DRAWDOWN TEST. -ALL TESTS IN ACCORDANCE WITH ADWOP AND AOGCC SPECIFICATIONS. • *TEST WITNESS WAIVED BYAOGCC,BOB NOBLE. 11:30 - 13:00 1.50 WHSUR P PROD1 PULL TEST PLUG. -INSTALL WEAR RING WITH 7-1/16"ID. -BLOW DOWN KILL LINE. -RIG DOWN TEST EQUIPMENT. 13:00 - 17:30 4.50 BOPSUR N SFAL PROD1 I CHANGE OUT IBOP ON TOP DRIVE. -TEST 250/3500 PSI FOR 5 CHARTED MINUTES-OK. 17:30 - 18:00 0.50 DRILL P PROD1 RIG AND TOP DRIVE SERVICE. 118:00 - 21:30 3.50 DRILL P PROD1 PICKUP PRODUCTION HOLE DRILLING ASSEMBLY BHA#6. -PICK UP 4.75"7/8 3.8 STG PDM AND ADJUST FROM 1.5 TO 1.15 DEGREE. -PICK UP FRESH IMPULSE MWD AND ADN LWD TOOLS. -PJSM AND LOAD RA SOURCES. -RUN NON-MAGS AND HWDP WITH JARS. 21:30 - 00:00 2.50 DRILL P PROD1 TRIP IN HOLE WITH PRODUCTION HOLE DRILLING ASSEMBLY#2. -TRIP IN HOLE ON ELEVATORS FROM 475 TO 6,363 FT. -200 FPM. -SHALLOW TEST AT 950 FT-OK. -FILL PIPE EVERY 20 STANDS. "TOTAL MUD LOSS FOR 24 HOURS: 11 BBL. 8/4/2013 00:00 - 02:00 2.00 DRILL P PROD1 TRIP IN HOLE WITH PRODUCTION HOLE DRILLING ASSEMBLY#2,CONT. -FROM 6,363 TO 10,252 FT, 7"CASING SHOE. -200 FPM. -FILL PIPE EVERY 20 STANDS. { -PU 194KAND SO 154K. Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 18 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 04:30j 2.50 DRILL P PROD1 SLIP AND CUT DRILLING LINE. !-CUT 510 FT. -CALIBRATE TOTCO,AMPHION AND MWD BLOCK HEIGHT. *SIMOP: PUMP 50 BBL STEEL LUBE PILL AT 2.0 BPM AND 480 PSI. CHASE WITH 110 BBL I1 POWER PRO MUD. 04:30 - 06:00 1.50 DRILL P PROD1 TRIP IN HOLE WITH PRODUCTION HOLE DRILLING ASSEMBLY#2 INTO OPEN HOLE. -FROM 10,252 TO 11,775 FT. -75 FPM. -SAFETY REAM LAST STAND: 11,6980 TO I 11,775 FT. —249 GPM AT 1650 PSI,100 RPM WITH 6K TORQUE. -SLOW SPR. 06:00 - 12:00 6.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH BHA #6. • I -FROM 11,775 TO 12,028 FT. -249 GPM AT 1770 PSI ON AND 1580 OFF. -100 RPM WITH 6-7K TORQUE. -PU 200K,SO 144K,ROT 165K WITH 6K TORQUE. -SLIDE HOURS: 0.54. I 1-ROTATE HOURS: 4.04 -DRILLING HOURS FOR TOUR: 4.6 12:00 - 17:00 5.00 DRILL ' P PROD1 DRILL 6-1/8"PRODUCTOIN HOLE. -FROM 12,028 TO 12,116 FT. • -249 GPM AT 1745 PSI ON AND 1600 PSI OFF. -100 RPM WITH 5K TORQUE WITH 12-15K WOB. • -PU 200K,SO 141K ROT 161K -ENCOUNTER HARD STREAK WITH ROP SLOWING TO 3 FPH AT 12,115 FT. 17:00 - 18:30 1.50 DRILL P PROD1 CIRCULATE BOTTOMS UP FOR SAMPLE. -PUMP 30 BBL HI-VISC PILL WITH LUBES. -ROTATE 100 RPM WITH 5K TORUE. -RECIPROCATE: 12,115 TO 12,058 FT. -249 GPM AT 1570 PSI. -PU 200K,SO 141K,ROT 161. -SWEEP RETURNED SAND TO SURFACE AND • CLEANED UP. SAMPLES CONFIRMED BASE OF ZONE 3 CONGLOMERATES AND PYRITE. Printed 8/19/2013 10:32:26AM • North America-ALASKA-BP Page 19 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: IX3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 22:00 3.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE. -FROM 12,116 TO 12,125 FT. -249 GPM AT 2050 PSI ON AND 1600 OFF. -60 RPM WITH 4-5K TORQUE. -10K WOB. *ROP DECREASED TO O. DIFFERENTIAL PRESSURE TO 500 PSI WITH UP TO 17K WOB WITHOUT DRILLNG OFF. SURFACE TORQUE REMAINED AT 4-5K NO OVER PULL OFF BOTTOM. ATTEMPTS TO DRILL: DECREASED RPM ;FROM 100 TO 50. PULLED STAND HIGH AND REAMED TO BOTTOM. FANNED BOTTOM OF HOLE WITH DIFFERENTIAL PRESSURE I INCREASING TO 500 PSI WITH INCREASING WEIGHT ON BIT AND 1 FT FROM BOTTOM. REPEATED SEVERAL TIMES WITHOUT SUCCESS IN REACHING BOTTOM OR DRILLING OFF. *MADE NOTIFICATIONS TO ODE AND FIELD SUPERINTENDENT. -SLIDE HOURS: 2.24 -ROTATE HOURS:1.52 I-DRILLING HOURS FOR TOUR: 3.76. -ACTUAL BIT HOURS: 8.34. 22:00 - 00:00 2.00 DRILL P PROD1 I TRIP OUT OF HOLE WITH PRODUCTION DRILLING ASSEMBLY#2. *LOW ROP/DOWNHOLE TOOL TROUBLE. -TAKE SPR. -10 MINUTES FLOW CHECK-STATIC. -PU 200K AND SO 145K. -TRIP OUT OF HOLE ON ELEVATORS FROM 12,125 FT TO 10,163 FT,CASING SHOE. -60 FPM. -HOLE TAKING PROPER FILL. -HOLE SLICK. -10 MINUTE FLOW CHECK AT 7"CASING SHOE-STATIC. -PUMP DRY JOB. I *FLUID LOSS FOR DAY: 25 BBL. 8/5/2013 00:00 - 03:00 3.00 DRILL P PROD1 TRIP OUT OF HOLE WITH PRODUCTION DRILLING ASSEMBLY#2. *LOW ROP/DOWNHOLE TOOL FAILURE. -FROM 10,163 TO BHA. -200 FPM. -HOLE TAKING PROPER FILL. Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 20 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date. X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT • NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 05:30 2.50 DRILL N DFAL 330.0 PROD1 HANDLE BHA#6. -10 MINUTE FLOW CHECK AT BHA ONE STAND ABOVE BHA. -PJSM. -RACK BACK 1 STAND HWDP. -FIND DRILLING JARS PARTIALLY CLOSED. *NEED AN ADDITIONAL 2"OF TRAVEL IN JAR MANDREL TO SECURE WITH CLAMP. -PUMP AT 248 GPM IN ATTEMPT TO GET JARS TO RELAX WITHOUT SUCCESS. -RUN 1 STAND OF DP FOR SHEARABLES ACROSS STACK. -CONTACT FIELD SUPERINTENDENT AND SLB I JAR REP TO CONFIRM NO STORED ENERGY IN JARS. -PULL 1 STAND DP AND LAYDOWN 1 JOINT OF 1. HWDP. 1-LAYDOWN JARS. -PICK UP FRESH JARS. -PICK UP 1 JOINT OF HWDP. -RACK BACK JAR STAND. 05:30 - 07:30 2.00 DRILL P PROD1 'HANDLE BHA#6,CONT. -RACK BACK NON-MAGS. •-PJSM AND RECOVER RA SOURCES. -PULL TO BIT FOR INSPECTION. -HANDLE LWD AND MWD TOOLS PER SLB. • -ATTEMPT TO BREAK BIT WITHOUT SUCCESS DUE TO BIT BEING UNDERGAGE,3/4". -LAYDOWN BIT AND MOTOR. *BIT#6 GRADE: 5-6-WT-A-F-12-FC-PR 07:30 - 08:00 0.50 DRILL P PROD1 I CLEAN AND CLEAR RIG FLOOR. 08:00 - 09:00 1.00 DRILL P PROD1 DOWNLOAD MWD AND ADN TOOLS. -SIM OP: MOBILIZE FRESH MOTOR AND STAB 1 AND RIG SERVICE. 09:00 - 09:30 0.50 DRILL P PROD1 CHANGE GEAR OIL IN TOP DRIVE. 09.30 - 11:30 2.00 DRILL P PROD1 MAKE UP BHA#7(PRODUCTION HOLE DRILLING ASSEMBLY#3). -4.75"7/8 2.0 STG 0.33 PPG AT 1.5 DEG. -6-1/8"SMITH XR-20 BIT WITH 3X13. -MWD AND LWD. -NON-MAG FLEX DC. • -HWDP WITH JARS. • 11:30 - 18:00 6.50 DRILL P PROD1 TRIP IN HOLE WITH BHA#7. -FROM 350 TO 12,063 FT. -SHALLOW TEST MWD AT 1046 FTOK. -200 FPM. -HOLE SLICK. -PROPER DISPLACEMENT. 18:00 - 19:00 1.00 DRILL • P 1 PROD1 SAFETY REAM: 12,063 TO 12,125 FT. -TAKE SPR AT 12,063 FT. -PU 190K,SO 155K,ROT 160K • -250 GPM AT 1534 PSI. • • -50 RPM AT 5K TORQUE. -REAM:12,063 TO 12,115 FT AT 80 FPH. -REDUCED REAM RATE TO 40 FPH AT 12,015 FT. -WOB 3K WITH DP=0. -REAM: 12,115 TO 12,125 FT. *SAND BLINDED SCREENS AT BOTTOMS UP AND SCALPERS SHOWED WALL CAKE AND LARGER CUTTINGS. Printed 8/19/2013 10:32:26AM AmericaNorth -ALASKA-BP Pae21 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 00:00 5.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE. -FROM 12,125 TO 12,261 FT. -249 GPM AT 1625 PSI ON AND 1550 PSI OFF. -50 TO 75 RPM WITH 5-8K TORQUE. -10K WOB. -PU 190 K,SO 142K,ROT 160K WITH 5K TORQUE. *PUMP HI-VISC SWEEP AT 12,125 FT. DID NOT RETURN SAND OR CUTTINGS OVER NORMAL. SLIDE HOURS: 0.41 ROTATE HOURS: 3.34 TOTAL DRILLING HOURS FOR DAY: 3.75 TOTAL BIT HOURS: 3.75 *24 HOUR FLIUD LOSS=17 BBL. 8/6/2013 00:00 - 05:30 5.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE. -FROM 12,216'MD TO 12,485'FT.(8643'TVD) V -249 GPM WITH 1600 PSI ON, 1550 PSI OFF. -85 RPM WITH 8K TORQUE. -12K WOB. -PU 195K,SO 142K,ROT 160K . -SLIDE HOURS:0.29 -ROTATE HOURS: 4.21 DRILLING HOURS FOR TOUR: 4.5 -DRILLING HOURS FOR DAY: 4.5 -TOTAL BIT HOURS: 8.5 -TOTAL JAR HOURS-8.25 05:30 - 08:30 3.00 DRILL P PROD1 CIRCULATE BOTTOMS UP. -TO CONFIRM TD @ 12,485'MD/12,345'TVD IN SHUBLIK FORMATION.. -ROTATE AND RECIPROCATE WHILE CBU 3X -250 GPM,1520 PSI OBTAIN SPRS,QUAD SURVEY MONTIOR WELL,STATIC 08:30 - 10:30 2.00 DRILL P PROD1 MADD PASS-BROOH F/12,485'MD TO 11,870' MD I-250 GPM,1470 PSI -60 RPM, 5/6K TQ 10:30 - 11:00 ! 0.50 DRILL P PROD1 RIH F/11,870'MD TO TD @ 12,345'MD 11:00 - 12:00 1.00 DRILL P PROD1 CIRCULATE BOTTOMS UP -ROTATE AND RECIPROCATE F/12,485'MD TO 12,345'MD -250 GPM,1470 PSI -60 RPM,5/6K TQ -MONITOR WELL,STATIC 12:00 - 14:00 2.00 DRILL P PROD1 POOH ON ELEVATORS -F/12,485'MD TO 10,832'MD -PU=183K,SO=145 K -MONITOR WELL,STATIC 14:00 - 15:30 1.50 DRILL P PROD1 MADD PASS-BROOH F/10,832'MD TO 10,429' MD -250 GPM,1385 PSI -75 RPM,3/6 K TQ -PU=190K,SO=156K,ROT=170K 15:30 - 16:00 0.50 DRILL P PROD1 POOH ON ELEVATORS F/10,429'MD TO 10,254'MD Printed 8/19/2013 10.32:26AM North America-ALASKA-BP Page 22 of 22 Operation Summary Report Common Well Name:J-29 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/15/2013 End Date: X3-0136Q-C:DRILL(9,847,752.70) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UW: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 17:00 1.00 DRILL P PROD1 CIRCULATE BOTTOMS UP -ROTATE AND RECIPROCATE F/10,254'MD TO 10,160'MD -250 GPM,1360 PSI - 50 RPM,3/5K TQ -MONITOR WELL,STATIC PUMP DRY JOB 17:00 - 20:30 3.50 DRILL P PROD1 POOH ON ELEVATORS F/10,254'MD TO 475' MD MONTIOR WELL @ 570',STATIC 20:30 - 23:30 3.00 DRILL P PROD1 LD BHA#7 AS PER SLB DD -PJSM,REMOVE NUCLEAR SOURCE -CONT LD BHA#7 BIT#7 2-2-WT-A-E-1-RG-TD 23:30 - 00:00 0.50 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR Printed 8/19/2013 10:32:26AM North America-ALASKA-BP Page 1 of 5 Operation Summary Report Common Well Name:J-29 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/7/2013 End Date:8/11/2013 X3-0136Q-C:DRILL(2,475,343.44) Project:Prudhoe Bay • Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL t 77.1ft(above Mean Sea Level) Date From-To Hrs I Task Code NPT I NPT Depth Phase Description of Operations (ft) 8/7/2013 00:00 - 02:00 2.00 CASING P RUNPRD RIG UP FLOOR AND TOOLS TO RUN 4 1/2" PRODUCTION LINER 02:00 - 07:00 5.00 CASING P RUNPRD PSJM,MAKE UP SHOE TRACK, -CIRCULATE THROUGH SHOE AND CHECK FLOAT EQUIPMENT,OK -RIH W/4 1/2"PRODUCTION LINER 07:00 - 08:00 1.00 CASING P RUNPRD C/O ELEVATORS AND M/U LINER HANGER -MIX PAL MIX,INSTALL AND LET SET F/30 MIN WHILE CIRCULATE LINER -CIRCULATE LINER @ 6 BPM,230 PSI -R/D LINER RUNNING EQUIPMENT 08:00 - 14:00 6.00 CASING P RUNPRD RIH WITH 4.5'LINER ON 4"DP FROM 2,396'TO 10,183',FILLING PIPE EVERY 10 STANDS -STAGE UP PUMPS TO 3 BPM 450 PSI TO 8 BPM 1025 PSI -P/U 173K,S/O 147K 14:00 - 20:00 6.00 CASING P RUNPRD CONTINUE TO RIH FROM 10,183'TO 12,470'. TAG 15'HIGH WITH 30K DOWN -RECIPROCATE FROM 12,470'TO 12,445' WHILE STAGING PUMPS UP FROM 3 BPM 510 PSI TO 8 BPM 1360 PSI. -PUMPED TOTAL OF 3X BOTTOMS UP Printed 8/19/2013 10:32:53AM • North America-ALASKA-BP Page 2 of 5 Operation Summary Report Common Well Name:J-29 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/7/2013 End Date:8/11/2013 X3-0136Q-C:DRILL(2,475,343.44) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:OOPM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 20:00 - 23:00 3.00 CASING P RUNPRD CEMENT 4.5"PRODUCTION LINER AS, FOLLOWS: 1-FILL LINES WITH WATER AND PRESSURE TEST TO 250 LOW 4500 HIGH PSI FOR 5 MINUTES EACH PUMP 50 BBLS OF SEAWATER WITH 2%KCL @ 5 BPM,800 PSI PUMP 30 BBLS OF 10.0 PPG MUDPUSH II SPACER @ 5 BPM,640 PSI -PUMP 61 BBLS OF 15.8 PPG CLASS G TAIL @ 5 BPM,EXCESS VOLUME 40% (YIELD 1.17_ CU.FT/SK) -DROP DRILL PIPE WIPER DART -RECIPROCATED PIPE 25 FT AT SURFACE WHILE PUMPING CEMENT AT 5 BPM PU WT=180K,SO WT=121 K PERFORM DISPLACEMENT WITH RIG PUMPS 48 BBLS DISPLACED AT 5 BPM:ICP 400 PSI 19%RETURN FLOW -32 BBLS DISPLACED AT 8 BPM:ICP 500 PSI 20%RETURN FLOW -18 BBLS DISPLACED AT 6 BPM:ICP 1400 PSI 21%RETURN FLOW 2 BBLS DISPLACED AT 3 BPM:ICP 1035 PSI •-DISPLACEMENT FLUID:133.9 BBLS OF SEAWATER -LATCH UP CONFIRMED AT 99.8 BBLS DISPLACED,WIPER PLUG SHEAR @ 1350 PSI I-REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 1000 PSI -TOTAL DISPLACEMENT VOLUME 133.9 BBLS (MEASURED BY STROKES @ 96%PUMP EFFICIENCY) -RECIPROCATE PIPE 15 FT AT SURFACE DURING FINAL DISPLACEMENT,STOP RECIPROCATION 20 BBLS PRIOR TO CALCULATED LANDING OF PLUG -TOTAL LOSSES FROM CIRCULATION PRIOR TO CEMENT JOB AND INCLUDING CEMENT JOB AND DISPLACEMENT=25 BELS -INCREASE PRESSURE TO 3,000 PSI TO SET HANGER AFTER PLUG BUMP SET DOWN 60K TO CONFIRM HANGER SET -CHECK FLOATS-GOOD,CIP @ 21:20 HRS -PU TO EXPOSE DOG SUB AND SET DOWN ON LINER TOP 60K,75 RPM TO ENERGIZE ZXP LINER TOP PACKER -PU TO REMOVE RS PACK-OFF AND CIRCULATE EXCESS CEMENT OFF LINER TOP. - CIRCULATE 2X BU STAGE RATE UP TO 14 BPM,(CIRC 30 BBLS SEA WATER FOLLWED BY 30 BBL HI-VIS PILL AND CHASE WITH SEAWATER) -50 BBLS CEMENT CONTAMINATED MUD PUSH SEEN AT SURFACE ON BOTTOMS UP 23:00 - 00:00 1.00 CASING P RUNPRD PU CEMENT HAD AND BREAK -CLEAN AND CLEAR RIG FLOOR Printed 8/19/2013 10:32:53AM North America-ALASKA-BP Page 3 of 5 Operation Summary Report Common Well Name:J-29 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/7/2013 End Date:8/11/2013 X3-0136Q-C:DRILL(2,475,343.44) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL Q77.1ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/8/2013 00:00 - 09:30 9.50 CASING P RUNPRD MONITOR WELL,STATIC -POOH LAYING DOWN DRILL PIPE FROM 10,021'TO 4,273' -RIH WITH REMAINING STANDS FROM DERRICK FROM 4,273'TO 6,602' -POOH LAYING DOWN DRILL PIPE FROM 6,602'TO 49' LAID DOWN TOTAL OF 90 DOUBLES AND 207 SINGLES 09:30 - 10:00 0.50 CASING P RUNPRD CHANGE OUT SLIP INSERTS AND LAY DOWN LINER RUNNING TOOL AS PER BAKER 10:00 - 00:00 14.00 CASING C 12,485.0 RUNPRD WAIT ON CEMENT TO REACH ACCEPTABLE COMPRESSIVE STRENGTH TO TEST CASING SIMOPS: DRAIN DRAWWORKS OIL,CHANGE FILTER, AND REFILL OIL 1-INSPECT TOP DRIVE AND CHANGE OUT TOP DRIVE HYDRAULIC FILTER -CLEAN MUD PUMP DISCHARGE SCREENS -GREASE CROWN -RIG UP SURFACE EQUIPMENT AND 2"HIGH PRESSURE HOSES AND TEST SAME TO 5000 PSI ON CHART FOR 10 MINUTES -REMOVE WASHPIPE AND CHECK MAIN SHAFT AXIAL MOVEMENT AND ADJUST TO SPEC -GREASE TOP DRIVE PACKING BOX. -REINSTALL WASHPIPE AND TEST TO 3500 PSI -PULL WEARBUSHING,INSTALL TEST PLUG AND TEST CHOKE AND KILL HOSES TO 5000 PSI -CHANGE OUT ELEVATORS AND MAKE DUMMY RUN WITH TUBING HANGER -STAGE 4.5"TUBING IN PIPE SHED -CHANGE OUT PARTS OF ENERGY TRACK FRAME 8/9/2013 00:00 - 12:00 12.00 CASING C I 12,470.0 RUNPRD WAIT ON CEMENT TO REACH ACCEPTABLE COMPRESSIVE STRENGTH TO TEST CASING 'SIMOPS CHANGE OUT BAD SECTION OF ENERGY TRACK -FINISH STAGING TUBING IN PIPE SHED -RE PLUMB MUD SAMPLE LINES -REPLACE TEST PUMP ISOLATION VALVES -MEASURE C-SECTION HYDRAULIC LINES -CONSOLIDATE YARD FOR RIG MOVE Printed 8/19/2013 10:32:53AM North America-ALASKA-BP Page 4 of 5 Operation Summary Report Common Well Name:J-29 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/7/2013 End Date:8/11/2013 X3-0136Q-C:DRILL(2,475,343.44) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1 ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 00:00 12.00 CASING N CEMT 12,470.0 RUNPRD WAIT ON CEMENT TO REACH ACCEPTABLE COMPRESSIVE STRENGTH TO TEST CASING SIMOPS -CHANGE OUT BAD SECTIONS IN ENERGY TRACK. -FURTHER INSPECTION OF TRACK. -GRIND WELDS IN PUMP ROOM. -SERVICE SLIPS. !-GENERAL HOUSEKEEPING AND PAINTING. -PM ON MANUAL CHOKE. -INSPECT CROWN SHEAVES. -PM ON BLOCKS. -PM ON CHARGE PUMPS AND SHALE SHAKERS. -INSPECT AND AUDIT DEVICES ON LIFT REGISTER. -SLIP AND CUT 95 FT DRILLING LINE. 8/10/2013 00:00 - 06:00 6.00 CASING N CEMT 12,485.0 RUNPRD WAIT ON CEMENT TO REACH ACCEPTABLE COMPRESSIVE STRENGTH TO TEST CASING, CONT. SIM OPS -CALIBRATE AMPHION AND TOTCO SYSTEMS AFTER CUTTING LINE. -FINISH REPLACING ENERGY TRACK SECTIONS. -INSPECT AND AUDIT DEVICES ON LIFT REGISTER,CONT. -CHANGE OUT SHAKER FEEDER SEAL. -COMPLETE WORK ORDERS FOR PIT I ELEVATOR AND SHAKERS. 06:00 - 07:30 1.50 CASING P RUNPRD CHART TEST 7"CSG X 4/12"LINER AND LINER TOP -250 PSI LOW/5 MIN, 3500 PSI HIGH/30 MIN, ,GOOD PUMPED AND BLED BACK 6 BBLS 07:30 - 12:00 4.50 RUNCOM P RUNCMP RIG UP AND RUN 4 1/2"COMPLETION WITH GLM'S AS PER TALLY TO 2811' 12:00 - 20:00 8.00 RUNCOM P RUNCMP RUN 4 1/2"COMPLETION WITH GLM'S AS PER TALLY TO 2811'TO 9300' 20:00 - 21:00 1.00 RUNCOM P RUNCMP HELD D1 DRILL(KICK WHILE TRIPPING) FOLLOWED BY WITH ENTIRE CREW 21:00 - 23:00 2.00 RUNCOM P RUNCMP RUN 4 1/2"COMPLETION WITH GLM'S AS PER TALLY 9300'TO 10085' -233 TOTAL JTS, AND 1 10'PUP. -PU WT 142K,SO WT 125K 23:00 - 00:00 1.00 RUNCOM P RUNCMP LAND 4 1/2"TBG ON HANGER -FMC REP RUN IN LOCK DOWN SCREWS 8/11/2013 00:00 - 00:30 0.50 RUNCOM P RUNCMP RU AND TEST SURFACE LINES 00:30 - 02:30 2.00 RUNCOM P RUNCMP REVERSE CIRC 156 BBLS OF 100°BRINE, 82 BBLS OF CORROSION INHIBITED BRINE -FOLLOWED BY 108 BBLS OF 100°BRINE Printed 8/19/2013 10:32:53AM • North America-ALASKA-BP Page 5 of 5 Operation Summary Report Common Well Name:J-29 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/7/2013 End Date:8/11/2013 X3-0136Q-C:DRILL(2,475,343.44) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/18/2013 1:30:00PM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:J-29 ACTUAL @77.1ft(above Mean Sea Level) Date From-To Hrs Task j Code NPT NPT Depth Phase Description of Operations (hr) (ft). 02:30 - 04:30 2.00 P RUNCMP DROP BALL ROD -CHART TEST 4 1/2"TBG 250 PSI LOW 5 MIN /3500 PSI HIGH 30 MIN -SURFACE INDICATION OF PACKER SET @ 1900 PSI -BLEED TBG TO 2000 PSI AND SHUT IN -TEST 7"X 4 1/2"ANNULUS AND PACKER TO 250 PSI LOW 5 MIN/ 3500 PSI HIGH I-BOTH TESTS MET BP TEST CRITERIAAND I WERE APPROVED BY WIL,JIM WILLINGHAM 04:30 - 06:30 2.00 FLWCLN P RUNCMP BLEED TUBING PRESSURE TO SHEAR DCR VALVE -PUMP DOWN TUBING @ 3 BPM @ 1,130 PSI AND DOWN IAAT 3 BPM @ 1,200 PSI -RIG DOWN TUBING EQUIPMENT AND PULL LANDING JOINT -INSTALL TWC AND TEST BELOW AT 250 LOW FOR 5 MIN/3500 HIGH 30 MIN -TEST ABOVE TWC AT 250 LOW FOR 5 MIN/ 3500 HIGH FOR 5 MIN RIG DOWN TEST EQUIPMENT 06:30 - 10:30 4.00 BOPSUR P ' RUNCMP PULL PS21 SLIPS AND FLOW RISER -RIG DOWN FLOW LINE,HOLE FILL,JET LINE,DRAIN LINES,JOE'S BOX,CHOKE AND !KILL LINES -NIPPLE DOWN STACK AND RACK BACK THE SAME -REMOVE KELLY HOSE -NIPPLE DOWN HIGH PRESSURE RISER, DSA,SPACER SPOOL AND ADAPTER DSA AND LAY DOWN SAME 10:30 - 16:00 5.50 T WHSUR P WHDTRE PREP TREE ADAPTER FLANGE -NIPPLE UP DRY HOLE TREE AND ADAPTER FLANGE TEST INNER VALVE ON OA250 PSI LOW 5 1 MIN/3500 PSI HIGH 5 MIN -TEST DRY HOLE TREE 250 PSI LOW 5 MIN/ :3500 PSI HIGH 10 MIN -HOLD PJSM AND PICK UP LUBRICATOR AND TEST TO 250 PSI LOW 5 MIN/3500 PSI HIGH 5 MIN -LUBRICATE OUT TWC AND RIG DOWN LUBRICATOR 16:00 - 19:00 3.00 WHSUR P WHDTRE FREEZE PROTECT WELL WITH 75 BBL DIESEL @5 BPM -ALLOW FLUID TO U-TUBE 19:00 - 21:30 2.50 WHSUR P WHDTRE PICK UP LUBRICATOR AND TEST TO 250 PSI LOW 5 MIN/3500 PSI HIGH 5 MIN -INSTALL BPV AND TEST TO 250 PSI LOW 5 MIN/3500 PSI HIGH 30 MIN RIG DOWN LUBRICATOR AND LINES 21:30 - 23:30 2.00 WHSUR P WHDTRE RIG UP LUBRICATOR ON OA AND TEST SAME -LUBRICATE IN VR PLUG(NOTE:160 PSI ON OA) -TEST 250 PSI LOW 5 MIN/3500 PSI HIGH 5 MIN,OK -RIG DOWN LUBRICATOR. 23:30 - 00:00 0.50 WHSUR P WHDTRE INSTALL FLANGES AND GAUGES,CLEAN CELLAR AND SECURE WELL -RIG RELEASE FROM J-29 @ 24:00 HRS 08-11-2013 Printed 8/19/2013 10:32:53AM J-29, Well History (Post Rig Work) Date Summary 08/19/13 T/I/O=0/0/150; Conduct PJSM; Start barriers list=annulus valves verified by cycling and counting turns, 13 turns on model 120 confirmed; Remove jewelry flange and piggy-back valve on IA, re-install jewelry flange with new ring gasket and torque to API specs.Test to 2500 psi for 5 min. LTT passed; Remove jewelry flange from OA and install VR lubricator; Test to 250 and 3500 psi for 5 min. LTT passed; Open barrier and pull VR plug; S/I barrier and bleed pressure to 0; Remove VR lubricator and install jewelry flange with new ring gasket and torque to API specs; Test to 2500 psi for 5 min. LTT passed. 08/19/13 T/I/O= BPV/0/180. Conducted PJSM. Barriers= BPV, MV. Start barriers list. Performed independent LTT on BPV and MV(PASSED). Removed tree cap and dryhole tree. Installed new 4 1/16 CIW upper tree. Torqued MV to Upper Tree flange to API specs. (L7M 675 ft. lbs+25 deg.) R/U CIW lubicator with 4" BPV H style pulling tool and 1-1"ext.. Pt'd lubicator and upper tree using MV as barrier to 300 and 5000 psi. independently for 5 Min. (PASSED)Charted and Documented. Pulled 4" BPV plug#138 tagging at 114". Closed SSV,SV and bled pressure to 0 psi. R/D lubicator installed tree cap Pt'd to 500 psi. RDMO. IA, OA, MV=Open, SSV, MV, SV=Closed. 09/29/13 PULL BALL& ROD FROM 10056' SLM, 10068' MD. PULL ST#4 DCK VLV FROM 5549'SLM, 5562' MD. PULL ST#5 DGLV FROM 3510' SLM, 3533' MD. SET ST#5(BK&GENERIC 1" DOME, 16/64" PORTS, 1500#TRO) @ 3510' SLM, 3533' MD. SET ST#4(BK& GENERIC 1" ORIFICE, 20/64" PORTS) @ 5549'SLM, 5562' MD. 09/30/13 PULL EMPTY 4-1/2" RHC PLUG BODY(used as catcher) FROM 10056'SLM, 10068' MD. DRIFT 11'4", 3-3/8"OD DMY GUN, DEVIATE OUT @ 11114'SLM. 10/06/13 Ran GR/CCL/5' perf gun and sat down in liner @ 11548', unable to get past and tools came back with contaminated cement on them.Ran 3.60"venturi to 11542'ctm and venturi was full of contaminated cement. Decision was made to F/P well and RD. 10/12/13 MIRU, Function test BOPE, RIH w/Baker milling assembly: External CTC, DFCV, DAJ, Hyd Disconnect (3/4" Ball), Dual Circ sub(5/8"ball),2-7/8 Extreme Motor, 3.70"3-bladed junk mill OAL=25.33'. Dry tag obstruction at 11,533' CTM. Mill from 11,533'- 11,620', taking 20-50' bites and pumping PowerVis sweeps, chasing out to 10,600'. No motor work seen. Circulate sweeps to surface. Suspected cement might have been piled up in sump of well, and clear past that depth to TD. RIH to dry tag.Tagged at 11,620. Reciprocate pipe slowly while pumping at minimum rate,waiting on more fluids. 10/13/13 Dry tagged at 11618'ctm, Milled through to 12086'ctm. No motor work observed. Lost pump controls from cab. PJSM, Utilize pump throttle control from tractor cab. Circulate sweeps out while chasing to 9961'ctm. Rih and Dry tag TD at 12257'ctm. Call town engineer and discuss dry tag depth being approximately 360' below bottom of planned perf interval. Got OK to pump final sweep and POOH. Pump 20 bbl PowerVis sweep. POOH at 80 fpm, pumping 2 bpm. Slowed to 50 fpm at 7300'to ensure high angle hole section is clean. Lay in 23 bbl 60/40 methanol freeze protect while POOH. 10/14/13 Continue RIH and perforate 11893-11898'md w/2 7/8"2006 PJ OMEGA HMX guns. Pull jewelry log from 12310'md to 9800'md just above station#1. F/P well and notify pad op of well condition. Page 1 of 1 s, 0 �� �a (V MEI M�MN 1L 29i !OHM ai�y B8M�NtA MEI l r 14 atdo 8.- '8883� N^NN N !OHM �{{ypp IAMN�O dd Of h t7 t'! Mpp d yY��y� � 000 0000 00,0,0 0.A00 00Cm 0 ,,90 0 € mmaaa Eazam mmmmm asmmm mmaaa 00000 00000 <0000a. "°,' m ITV4V QV<VW :o<av aaea: "'" 0'00' 0000 a , . N , W ICFM: oEoE -1, 'P14PM7RP ?22VO ONfq.pi pANgOOON ONA^ nnO,ONN1, , n AAnVVV An ,- ^ , ANN,, J ryNMgM FMAPP gMgMg 88%g% 8P8Xg MgPMM gggg MAMM N ooR^n C^CCO CCooc oo^oo Io`CtoCIo Io`to^O^ 0000'8 ODOR 01. PMP'3.N: W hNNpp Nm V-OAA^ NO h2N V 0 0 V ryry38 8 8 87,822 Rt3yY e`OV222 08800 O000 ' A� NNN1. U Aed w NNNN NNNNN NNNNN NNNN NNNNN NNNNN NN NNN 33332 AdaydIyI0I 33333 Amda2311y23333 322E CNN2N2N12M2 M:130N OAe.N VISAS 0TN p-ANA NaYV �Rs80888 3088888888888_'ooss o8o8 00E88 888E8888 83 a 'IM awma Mn ° in m.'YM MVhPWImw MI JQ8nR2 0oo0 N0H8 pp00y0 ?00p2227•2 p , RAMS 08a0--e 000-- 0000- 00000 ? C00 000N, ,00 • 0000 80N00 4284%.- 2M0to0 ht 008 m0OGt17 p2p{RA I.MIAA-�tOpp I1Ip0p �AtpIPA1NA1S100 SANG w00.c90 409. ..' m;07-' ttNNNN 28888 to883A AAAA 0^OpmMM V24,'=2 0r M O0 02 a (O Oh M0 0 r V a e080 00000 d NVY�AN00 O t712 iA?10.-17 d2I��Op,�nE. Oa{tpOA p m 00'09 0 0 0 m A T.".282 M 0 0 Y h N h n 0 22P:0_ 0 0 0 0 ii O^ .0 S o0 N 0 g -i-.1- N Vl 2 Yl1� N , 0 2 • 0 'x8p000 A�A AV2M1 p,%2Am 2,T. Yf p000AAUMA pPA'S 0 Vnnsi MV o Cp000 C-0a' eoRM8MO<t�h 0mPmP O, ^ 0 O; VMM vv.;:,,- N NN.t U E CSZ N .GEHm a 2-0¢°n n n. 2 1 0,-0 2 3 220p 0,-8 02,^01ppN n V AAAMG OA 00100Oy N QN 0m00M %y PO OO 1a COC-- N"7-S TM888 agms DRAppOIOOC O V`0t0 tCaaA z t o y .. ct 1 3 I- 0 X e E i 2g f A S >, Ce 812.g > 5xYO `o 0 p A novo p p p p 0 M J.C W - C O LL a i C p C : W F4o8n NOM Ya V.'-100 00000 Ia0 ovmo O-AAt7 NNMN i7f....M ONvO, p ii 2I� 0 O 0i. (4-'00009 0000 Comam (Gomm.- ,YA1Cnon o ,n omrno.- ) ,amm ED L 0 J O • m$OrOoaoo a m2C > 4 NNM nye.M oonnO ODaa00 00000 0000 -O w CSm,`o Fw u .1 2 u.w` > `oU a m rglicces22!Ssge0-_ a y w»��c�a��gc�ac��J 0 h 9E8p8$p$I'8p1 p$plSpIRS :1�172AR .`“,'2$ 28t8. oA, PP,:8a SAP28 830080 O ~ OMOCf 01 V QNIO z I.MON .maaO ^'N$A V d NNtp AR - .NNNN NNNN co —> VV L n p A p p pp m 0'SA 2p83ty Mat; 00 tE 2P V RP R28'18, 8 n SA T,.V2 Aft A,d AOI Iq,,,,0 pp 0i at�0Vy1 �NWya 0m I�0 01N0 *A n Itpp �CyNOM, Ohs Imp �A VM ,I e F ?N N to iY0f10 Ev?gsse OO�N N n8Vw,2 IO hs O100YN IAdI 1ASA s V ak 2 S aN 0NA V 8pp 4 8 AA ONOIcMytA 00y 2,A 20Z R321::!= 3 2:: 0PO2Aai 2 V 2 R SP88 N CS F "clitiN Nen � MARpm �mm" NANNm NOMo mMrT m 2m40Eau, a em O 'ca3w g$3 r111;9S) n<2 „ -wR= 8822: vl`�it8in YP VMSV 22822;MR eq Amn2 88 `3 82°18 2:2 N,1-8;.R+ § O ap M 1,--F 00000 C C N M M M M M M O d d d d d ON... M w O N.- .-?,-0 0 0000 Iii71°'-' A a O M M 5Ny N iL �aa HHgN FWg',88 <0O. -,, is Nz z z o p pppppp tp Y1V AAV 11pp A NOSE AAAA V A00M a Na0`82 .'-Anti v ES!A n ONOO h Hs! =g OO8 C MmtDN mpII�Ap Nm tyMV h aiV A^mAN fNV�Oyi ni f> M1�AN IAG pi�ryryrypll,dC COCl 2 Y ht0n n20,010 O vNN A Zed-A,-t- 1`1.100-,- cio� rib O : OI r�- NNNN NN N p K fA a t0 0 • L( S C c > O'C Sm 5 • C L IL E MOo agi.x JC9si .”. O 0 8.3325 " > >t O O C S O Wk K V LTg 03 ti)M 1-UJ JU 0 U CY i j CY 8�h NN NN 1Nh0 lD OmAtO OA ^WA mN Dmmp T md0o0N.-m(•O- NpON�N�r"1 OO1N��f.BC(d7mAO c(0py01^pOAply� O mtryC OO{r pN1�VtO rIpO Ah ^ p ao0 9E2 h0Opmb2h Nra§ dm OOi5i1 'P8HERE OO 04 h MRNhO N I h 882mmDM mO iii ! 00400 4140T dO<aV 4:400 4e0e0 OOOOd CCOPO mmmmm4448O 00000 00400 0 0 0 0 Ica r • r i r • •ttVV• r •• i • • • � • •rp0 p� • rp� • � � � tV� � r • • • • � r r Cid r i O• • • r Nr C• Q� r � • r COr r � • r • i � � ?ca m"E4 """ AA n02 mt7NOh �tp7�1tp1?{ppNN m W OOIr^n NaOaDD CB chi t•f N A t+l F,E1 RR t_•O V OE E W IhN t�l OAi N ry -;;;"5i.d��00 �p CCpp 1A 228NN m N W'm pOH Yp��OAf mN d {y 220 0i M MMt7M MM- t•f 187 t7 A V A h A^mm ISA AA VTR R h11� 8 gO •-m gRg vogg2 m A pwp A n n A A A Ann n N w n IIII���" 8mm m m m C 0 t� g a� 1Y. MMRS MMMMM MMMMM MPMMR MMMMM MMMMM MM MM MMM M MMMMM 17Mh. %MMM M M R 0on0o 00oGG GCGOO Go0o0 00000 00000 00000 00000 00000 n0.o0o 0RR010 OGRE A n AAw nnwn nAAAA wwwwA nnAAw AwAnA n wAA ww n n C FOCCr;RI'2 mONf`mIA 0�0AN0mdOpm 8A�7!, 81z- A42V./8 8A b W NNN p p0 .,g 14 dOEUR'0 RNOR d0 *§W Ogm ;g0N R V ( ppN $N EMS' m1 22 2 ma$aa aiiSi 88888 8888m 88888 88888 hm�R2 hhgThmmhR Cm8 20082 HHI Pili: N2N Om1Ydl HH$ OOImH 8PJI pN,N {V'O h {221,n C+ h YG HrJ HH �2 bNthO ff�mp�Cpf fAOm[O�pm�OQp,] I�nh8N pahappp WOD mntmtDDm� pOp�i1 tpVVpC��N O O O O O O O8 0 0 O O O QQ 0 0 0 O O^O 0 0 0 U AAA wom. gssia um122 amf ml8mmmmolol mmmm NmAmv1h N2 �y pN� bvlmmmuf 8mm N1N.NN 11/%'? CNN--V PN8t70 ON<W O 4.P.'888 OA mN O OSA 00s odf102 V tG8.--am CIN Y,82, h n 2 C0 NO00 N 8822 O 00 00�.-'- Nc'iMNN NNI-NO NNNMM O NMN. NON Oe- GONG- G,-rON 00,-00 Or-NW. NNd d t7 menmen W€ene•11! 2"" nf t2�0 m0? O�N N n npo NaODn�i tOO�< (010011*2 mpOmp m�tvrOf1 a0,n 2�tppOptp11[m')8pm Ctm7pC d Cmi fef .mO'-CSmtf mryhD{t��pNO aztiD1Of VO pf 801. if MMMNN GCI t7� W NNNN N Cf y V REM OIO+Ohd MEI tO lm+m TO O thNV l'f M V v1t0 mA 00118 EE FAH O • . r � � � • i i � � • N NNN � N NNN N N N N th�M m=!? N N Nm m28F282 /.8g=7,8 M42W2 8g22 P 22,162 228/A 812247 mmrn' 82 2gti v1A ::::: O' WN NNt71m7? ::::: G ::::: .Qa1mld�yN�Y v>tmCCM UfNps 1�011mV::::: tvthvtvt7h Me•f�yY <Y000 VfNNN htDmtOrta X88.1-1 02208 t7�' neNwdh� nmmo h� h �pt� tpVpOOpf1a 1`pp•,,n 1100.- �'imamryn �morGGE-CINmMi!! NM1.1<d2NE08100�N10nh01 ::::: NmmE1� Aim�0 {pppffV � ��!!' � � .- NNNNNNN0C)aD❑,€: ?,:Am mmmd m and Am 22'2 m Nt7m `�1tyi �t'�f 28G 0mas n�1 mmmd nNtn�t`"o `r°$tdnn .�rA•IA�.+�m a3Ma"�3� m0 � p o(V�0 Y 0 Q N GGN!N X5 E �Auff 2 NOIEErGO 'R 1UNtpG� NODNR.0 O h tO 1808 1008100•e- NI•mS NN h N NNNN N01 O^~08 00t$�tVh�� ��� N N Nth e'1 C! iiEER h8 �N mT8 O�Nh tV e�t")� th Ml•f M m p1 p a �vf m p, p 1r tp p pp m W n t,",7=g2 P12 V O 88.;12 h W t0�� 42Cp eepp28 �D NNhn 21�M2N 802Pm'f d O8"; eCm�A mt7 OCNp pMpff ���00 WC11 vNvff w O 8 00000 4:244F. "N'tx ?0&l tOOtmO mm010vf A24.72 t2 - 2It'R22 Opm O N tp�l�yf VAVfg,754 TOO CN hY 00 m �hh vmj a L ..... NN N NNNN NN NtmvN RMMO {717 ctM0 h M d V ma 2 pp pp 22612 tp pp a C a%% NCNnN monmmm npN1M ."2241 /42-62 22',;8N ", NO 27:4,7CNN22v NN88 Nh " ".(4'48COP'''. 2NOm2 mjpAPiyNyN NN8mm 84ONmmmV2hmPiNO 0O0p 0m p1 ;Ct/ ppAiU ppOdd dOdd 00000 44,2.L7, 122h2 1.22. 2t;.22 NNN to f0om m'2 VNn.1- 170NN17 mNNi�N 001 mM OMV-2; NCCNAN 22&'00 �I�tp NfNV N00m' Ny2t?Nt7 mNEOhfT �N G1Chf m..7,9 N 2 hhO mCD�n t WAR •y-uG1 1001 tp�piA t0Y NO n inn n 2Si0 fN-� t7�y� O p�OOiOOf HER; uf f0 NO W mmNT (71my 18.1 NNNNN WA 17 t70I t0� t�i Oh!?d V d M d d d d V<u0] YO!,73lNtf, vhi 7,1 E1ff N m t0 N�( rid/ 85108 ! ttyy p {p {{pp pp N OTm0 22,%22 A2?Ohf r V,222'; "N.222 00/1008 &;222P. O2"2 "88."' A Ohf r NO BTmNN m211"N N GciNN r N n N EMU, NMtO tp8mm a ERM wA OAn N1A tri YI tD bNtG.NN tG MAR '^ N UEFA $�N k E HNNM°N° UM' NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN MARY NNNNN RARE 4`e m 'CM8Z28?r 80r 2O 22P-R8 2mR8 A100D `1"1,V=- 2228 1p0N 1N8N8N N W:m1 m OtAO1;222 220 00,-NO WOIN`W TNN4NpoMh7 N2888 8ouiNN8Nh23m88800f34, 7 pVMp 228 r0 m1A0N 8 P,g8 f r 00100 NM p?1�Np m�m r Cpfl OOM p< A(Or O V N1�N HOE tmf epO Yf Mt. IAS. m 2 V d N CNp T ImzOm Thum'18< ”,8tpd7f h �r�pA NN HOU 1t�fVfiN A{•p-000 Of 0.fp mCmnl yA(O IOb 1(f 0VJ(s]t7 t7N yNC00 NOf CI)� r VN tuhOf Nb mdp♦N1 C'1�O e7NN 0 h 0010 N N NNNN HMt7 PRi t7 t7M Of 00 V d d O V<Q O 87,127,0( r0NOEO Nm tt. thO tO rD mDs 10�n Pa n n rA A 0 (V N V 8 • U E E . c U d { aygg'�� 1qq yy�� RiIRRO grm egsRii 13 i�S �nmAf lrm� -s- mmi710.t Pi'oo0oe oS„o mS'.S',S.g ommsggl 2N�ImmO 2.22 12222 2..PR Nm 0 0.000 0000 oSIOo 00000 0 000 r r mmmn rmm r n n n Ar mmmmr rmnn J nm mEO aD aDW mCDmmm mCmm� moron am mmmm mmW maDm 0 m mm 1 amm1W QtCtGadmm 0e ad0WW2 00400 00000 0,004 000 x0000 d eav arae eco00 eve 0 W441.1 veeee vve a vv QQv 4c8 "V-1 m RE a 1%f "012.iP gym''7e ,8. u� orf(4eFIEFIv pHaUE Env': EMI �p m W�N� 'LEM 'C fj .�+ 3 2 r Rg§ W'O iD m FgSoN AP<HM t0 n n EDm 8200 W ^ Npp zsm a, AOONOmA �_NOf00 �QN' f7 H 8immm�If OAi O1 y 0O 17 f7� �Nm(On mAO� NRRtFi[hi i�f Mi'f Nl g tV{ylVRs 4,hNc �i ARRi C)`2 n1M7`v2P2 nnnnn mORR FIRM N U RARR18 `22222 0222 r 2 RSRSR M 17 MMMMM Mt717 n 00000 00000 00oo0” AH:n-g nooR2 000r00 00HH0 000cc 0o0og n.coo ` t0 b a Lm0 8.1"'.3 87382 NgaPS SPLPn Cm2WSR SNROA N8,87, 280" AVWA ,Z88'418QVmN02082 IggPmrMA W2NNSAbNMN2Z;22 ArnA^ gFAF FWAAF PP. gA AnFIA nFFimm222 2;,-22W MPRbCSOqpONCmmMmS OObME 0SMME OCRbMCSMbV mm OOCOR mRMN bMb22C CWT 88282 4G'NAm 88 2m 2 '88h '68'8" .4.-5S W. V.HPJ 822 4122; 2"0,H0g"."2 "."2 "828 88 OW8 hm 27," O"S8886 W8, RENMM EF0 NmN(M ARMN N'N 0.012 hRCW HProo=m Wm NWM NMh Cmm VIM 2HMIR VM '1122 22N23 OlNN O0S ,- CQQn7mm 22'282 2G22-r, OrOsF gOmpm HWMHH Npp<<er „2R0 mmVa pgmMNNd0 NorON O. vo= 120,0 ...0 m mcoo w, mm Prom Q tO EG Om mA C.GQ W ;m o m.o. P•18 :8 88H0 N BIHn Nn G P "2" "8;2 82rNHNSmr28"2,1 !!!7;:H mRhF7 N000 r 224 N rn MMS�ryryNNNMO 0SSmq VQWWpo8mmmm 2m2 ..2:5:5 0FFA sass In 1;f m 11x a 1.+1 A g 1`i 1V r;1N,f 1Nf 1'M1 P 1Nn P P .n M< 1n 12R 2228N 88.1aAOF I WA n1 NRM RHh0AQrm ::::: F N N N N n NNNN AmNNaa50riNn71<Gm rNnm ::::: M § :• OO OAMN NNNN1E8 Hpp0 O::fr 288 nWgr pp ::: ::::: :Rpp • 282 822" 888201 Qf mMC 'tpO" O"" NAOd2SRMAays^N221,5 AMA W M .mN W 0 7 i8 RAM < AE MMMoMMN8pN122 lrm mmm22 ne222 Ag220 fV O px:= 1881. rmn �,Bn2 "rIri g2 P"rQ AM g:=282 :=82 "4"8 "8" 8m ""71 8,1P:" 1Qt.g " ¢O • 4mS2g yp222g 0NHR° FWiam PA42,1Aom1.17,22 ASEr4 Rat% A AARtAPF,mOO O OQ OeQee Q OQO< SqaOo oveQ Oaese eN UWh W 8F2 M 000 mW A m y<p 0QrNif"OO 28882 A P 2oP 2 N FmRW 2 V g 2 O 7iSm 2 m 8 T8 2 V N 8 o y R A NN A mrryim1,a1z vm00-- 0osopN „0,20384N22A gRII rwcz a mn^" 20 , 131M5 um .0 N0N-Nr NNNN 2 0F-Km N atryrH m PNO wn a S$p, 0. aC p SA mnma 72< r3OF7 m1y V 0MSS S'•26711;', r 071 VNOMSmS N -8A ' '2"' A22'" 2 20r CNrA 8RS2O RpX §2282 R;,-2G2 0QWg O W gW21pOzO . FROa0S gIA22 mmNSm AWWW2 2.W22 m222 2 MQppp m WmH0 SEP: t:SN.r MRnm8 ON77N 007;Sp.Nm0 r A CO3 NNOr0 8"38 NN m� 272" Hr0h W OROf m t=2;7,7 ad ra' ""0, Xm ° 2"Ve 8022t; gm;e2 aIRZf � F oa^b0 nOM Fam ERHE muiySmmmbmomPmmWsroOHDDWH TOp p p 00N LNorH eNWiMami0 mNN rFe OmgWNM2M "vmmm "2" "2",% 0F Ot82 "8" M,v8�n Stri Slc ,W4n3 R ...m ..§m* 0§m§ j _ „0„ E %R. Nnn m -f v ICSM W O ^Nm ARt5,7P. 28422 Prr VHA PN m n n H n M no n mga s ;832Z; Am,0M m 22212 s m n M H HNNHH NQe1NR NNHmry AL282 X2,520 40022 ZAT10` 22nA rmmmm 2222 p: 88"8 "? W S:rWmnWWO mOf6122S mN Q 0S ONWnR L i m ; etrengm m W err W s S7,rM M0 AtnO^M m APIS S2V'R RAPTV 8822m 2 mT2s m 0&MNm,OmN7tesp02 NN�Asg, mm1ON P SA2m0a2 SO8A 28,2t AO„' 8223 50000 00000 000 0000O7 17 0 cc Ny 8 6 v O 0 C vmi .l IMbn2 mnim NnN2m N0 s . NNtrsgmSg.. S24 .,§22N ....-..-•00 OOOO OO O OW WWW Cl. J WWWWWWWWmWWWmmWmW bW W W WWW W 4 C C 4 4 44444 O 4 O V O S4 a yy yyyyxyyy yy5[ yyv� ��gg �p "`���.,, c7 J id Ada fin' AAeta AAiAN cb`3R A L o o ^0000 oo?oo p.^oco noAroP PP v` mm 4r� a p 6pp <O- 2F2 mm2 VWSS2 nOr^VA NP22S 28BP Oni i g. ..... t0..,,.g�. mmy�ryCryN�ON mOOp�m qm W...m gy CMg' m`�ibA`E &Erns A2s2M mE 2222 2.emmm `am 2FI 42228V 2l022P 88, 22824 VG L Stn woo t'mmn . m. N .1' . i 9 H�OPg alaso nifE g n E, 2mmmm wag i mm2 2mmmm m y mYl b b pp wag 1A 1ff p��Ny,lf,yOp{bp Y)m�Yppf b t8! p pb clr '8!n! !!' WE 20PCDtn NfbMN 80 O t0 EC IN NntD m�- bNf Nr N fV CC•- C ppi�pp,,qq�� ,^`` ... F �• 222222 S"VC pp - 'iiiiii tFg. 2 .7,1.' SS2F + S2W4SS Ap0.1�22i4 `2�8 .@ - jnryPy'Y;iR' 1 N 44422 N N N N N T rm rm N N N 2 2 S p 0 b g 27'7'7`7 *00 ,7 nnrsnn 7°e7"en 7`7 m =em «viA2SV 218Zh SZPISA XXnne xWW .2.2� . Sm mg&RA 2.A22 Mm <� \ tA 4. ,,1)2292 "2 e'$ VNVNiP.er2211 A2F2h, 8:zgA 21° i ' +pIlki o C ^p13a YS mpv;1' 2P2SA 2n ZZ• _ - Ni U CaCd OVP YQ<O 44444 tl..:i N U cp V pp��yy U OiaA Wfly:,,2W.n- 222,8,�y8 YVm�psd ts)PSpfSF nN 0 .228 52888 >00S Zj V Q ...b Nt7Mt7, aanY NN g 0 N EL-.-5 N N OMA,V V V ;,--N b YJ mbbbvi � 'iA bb b 2 ffi-omm b' fi \r ii,, % 03 , j W Q 24!W O Z2241; 2241; Wmb2m2 2222:: dM N: g-,2 !Y EOOO1Ob4 t Z F .0 C $ , \ ` O m hMOOMV NONN+- ggONA SA m2N ' m6� scmN NNNn rNnm 2NM 77x Hm r- ; i t a2_ O a tCV e ` o ;� J RFS mrr'm Q2,1224«2 ( OWW tit 5ab: 5 E c gR m a e5 L; I- ° rm $NbS84 egIsm mCo4o wmmwmm 5 ,o O b. cm_ \E$$$$ S22 2222E Vara/ 2i W.5. p 0 a 25 ;,- '=.' - N - m « ."b"' q Eso cm ' _am 'Ta „ 28.- aihmo to H2:2tiO. p0ICN2 NNOSvv 22471,2 S2 m O C d V "Ill A Q�V lM0 NCf D Hill II 2 W Q U V "Ill 2i mm mm11m mill II d d0000 Z- .;ommar mm rmb 2g 0 °=gggg42o Z 3Lo N•-m ovmmo b,mm, tibc8un mo U 0 m.�X ii33 $ r m nye.6 n,n �c 6+n.n r� Nr°i adti n ui m � r NE 2322 APAAA m2 o I 23m8v-§8 f.K N N o E.N- N W 2 LL' m g p m mm p�rpEE p pp d w W o G E0 bm;nm V C V Nm ANN 461242 sq.', OS a.o02n0§"aO mm C V 22444m CV Obi 2 0 0 0 44:=44 d N t�r .n. V LL O N m m N m A 'n "_mv LLT z A 18 I ReVV 3�<y<'Y°Jgpf .tf�W 222Vi'22 4411162 +001Q22 88 281' v V �d O•f u'i rim en00�8 ObmRN Om 5,f0 • r rr rr ,.-.-v-, .-,..-,,,1 NNNNN NN CO80 C0 O J BN ry w 8 O E O at',a 01 E C E C 22 ° mm Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator [AKDCWelllntegrityCoordinator@bp.com] Sent: Friday, October 18, 2013 10:03 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad RJ; Sinnok, Ralph; Rupert, C. Ryan; Wallace, Chris D (DOA); Regg, James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; Climer, Laurie A; Lastufka, Joseph N Subject: OPERABLE: Producer J-29 (PTD#2130330) New Well with passing MIT-T/IA Attachments: J-29 Wellbore Schematic.pdf All, Producer J-29 (PTD#2130330) is a new well which was perforated on October 14, 2013. The well passed both an MIT-IA and an MIT-Ton 08/11/2013, confirming two competent barriers in the wellbore.The well has been reclassified as Operable. A copy of the wellbore schematic has been included for reference. Please call with any questions. Thank you, Laurie Climer � litc�ni;r:. tic, i)r�hrur/ BP Alaska - Well Integrity Coordinator (MAl Get Waifs V r Y Organization WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com • 1 IIEE= 4-1/16"CNV SAF .TOTES:WELL ANGLE<70*@ 10944'*** WELL IAD= FMC11"5M ACTUATOR= BAKER -29 4-1/2"CHROME TBG BPROD LNR''* N11IAL KB.ELE 77.07' I , ., BF.ELEV 36.5' G 1 KOP= 2948' 510' —19-5/8*TAM PORT COLLAR,ID=8.835" Max Angle= 118°@11816' Datum MD= 10623' Datum TVD= 8800'SS __. , I 2013' H4-1/2"HES X NP,D=3.813" 20"CONDUCTOR,131.45#,X-56, ID=??" — —114 9-5/8"CSG,40#,L-80 BTC,ID=8.835" H 2625' , GAS LFT MANDRELS ST MD ND DEV TYPE VLV LATCH PDRT DATE 5 3533 3514 19 KBG2 DONE BK 16 09/29/13 4 5562 4990 56 KBG2 SO BK 20 09/29/13 Minimum ID = 3.725" 10068' 3 7714 6302 35 KBG2 ()MY BK 0 08/10/13 4-1/2" HES XN NIPPLE 2 8828 7289 27 KBG2 DMV BK 0 08/10/13 1 9859 8214 24 KBG2 DM' BK 0 08/10/13 I I 9935' —14-1/2"FES X NP,D=3.813" V 9964'i—7"X 4-1/2"FES TNT PKR,D=3.856" Il ' 9999' --4-1/2"FES X NP,D=3.813" I I I 10068' —14-1/2"FES XN NP,D=3.725" TOPOF4-1/2"LNR H 10081' 1- 4-1/2"TBG,12.6#,13CR-85 VAM TOP, --{ 10086' Q I \ L 10081' —17'X 5"BKR HRD E ZXP LTP ID=4 _32" 1 .0152 bpf,D=3.958" `� 10086' —{4-1/2"WLEG,ID=3.958" 10103' —17"X 5"BKR FLEX-LOCK LNR HGR,ID=4.32" 10113' --{5"X 4-1/2-XO,ID=3.870" 7"CSG,26#,L-80 VAM TOP HC, H 10259' ' • .0383 bp,ID=6.276' 111 1 10118' --14-1/2"PUP JOINT w/RA TAG PERFORATION SUMMARY REF LOG. ANGLE AT TOP F . @ ' Note:Refer to Production DB for historical perf data SFZE SPF INI I FWAL Opn/Sgz SHOT SQZ 111 11396' —I4-1/2"RIP JONT w/RA TAG PBTD —1 12394' ..A.A.�.A. 4-1/2"LNR, 12.6#,13CR VAM TOP, — 12469' 0 AgA .:. .0152 bpf,ID=3.958' DATE REV BY COMMENTS DATE REV BY COMuENTS PRUDHOE BAY UNIT 08/11/13 D-25 INTIAL COMPLETION WELL: J-29 08/19/13 PJC DRLG HD CORRECTIONS FERMT No:P0130330 08/24/13 JT/PJC BF,WELLI-EAD UPDATE AR No: 50-029-23486-00 10/09/13 JLS/JMD GLV C/O(09/29/13) SEC 9,TIN,R13E,801'FNL& 1951'FS 10/13/13 JT/PJC FINAL ODE APPROVAL PD Frnin.,r:nn/AImickmil DATA L .AGED /11/2013 e2N°."" � Oer3 M K BENDER vv z-'S23�S Schiumberger 511 4 ,; Drilling&Measurements MWD/LWD Log Product Delivery / � td g Customer BP Exploration(Alaska)Inc. Dispatched To: Makana Vender(AOGCC) Well No J-29 Date Dispatched: 15-Aug-13 Installation/Rig Doyon 25 Dispatched By: Elena Greblova Data No Of Prints No of CDs 1 Surveys 2 Logs: VISION Service MD 2in 370 to 12485 1 PDF included VISION Service TVD 2in 370 to 12485 1 PDF included VISION Service MD 5in 370 to 12485 1 PDF included VISION Service TVD 5in 370 to 12485 1 PDF included LAS Digital Data )1,2 6 Please sign and return to: Analisa Steger Received By: BP Exploration(Alaska)Inc. Petrotechnical Data Center(LR2-1) 900 E.Benson Blvd. Anchorage,Alaska 99508 Fax:907-564-4005 e-mail address:analisa.steger@bp.com LWD Log Delivery V1.0,01/22/2010 p g m n �A� c o c c��°fmT�?v PA ?Tim3 - -8.-,iiaa S d n' d x o Z m o Ckg T o a d m F n 3 m N ; z m N 1 m � r Of m j E A x o w p 0 � D O mw.- W O.2 W O AwtA00m1tN11 NtONNt00 mNlN0 ON+41OVt NtNOtNON S 000.!500 3 0 mIV ibW OppNG JwiOw V AN w+ ApOA41 MAGI V O A000 OGGNO +!! !+A m W A N+W !m m A+ 0 01 W m N +W m O A N 0 0 0 0 0 0 0 V p,O p)- Zp ZZ N to - T c�CJ2OSmNmOr 0 oj 8 D goN N Wm + pWp `N 0000 OO+++ +NAAN ...mm AAAAA AWtWW to0to00 000(o O Fo8 Cjo NwAN wl+OG !2+J2 W(JmOA A(WWmW WONJ Jm0NV WtWp0aN'NW aDW N 0m ao m*m oYa k ! > v 3 N0NoTi W WAWA!g NNNWA VAmmmONN mVWVN+WOo '- pOI 2l20 §00ONN AOmOL VVW .2`0+L NyWAN N+.2+0N0N00_ pNp! P W !.2 N NNN,, N OA1J m A+G>A �SC NN,1 as-4-10 7.P9'..o mNm O A00 V42-4,13 W to Si Oo Wo�1 (N� yc (� {mp !W O V A f. ..".-.P.qN++J N ",,,,,N:•, v `+W+A +01CN+ AO`l OtVl10 §NOmo(Vl1 W J W OJO mL+Ao +11.2`+0 22i,18933 {Q C') p m O�(p C N A A W P N!t00 W `J O V N $ W 2 01 t8:122 N.8 f 0 N Nw O D A t O tp 0 S o o *G J N ;43;35. 0 m N N m N N m N N D N I V+ t 0 N m o lO.Ao g214Ng AO V wi0 p+mmio A W A+w NC1m+ Ommt010f0 t t ONG3; iw //0� m + m W V m +N J N J W NNN O A O J A J +V m t0 m`m O V O y/ rgy�Z3o;-t-t3G1� «N c <D t01 ].0 01 Y Y N Y 0 Y 1D i as0 t1 0 00� 3 I 0 --)n m m i N A A__� v C0. D p• _p p_p ^ m n m m n o .► S §4JCOD 0,,000.201 N 64,1; W V 110!10 410004 +J W m§ Nb W 00 bOOOO N n Y 1C j O 09 A�G A y l '0' "N n O NA2 W w i0 V IJ ! W V iO+A pNANm ppOAmA W+Aro A OA W 002 T Am 0 Y D O T 'er Y tP 0 0! (D .g(1.312 O+L!! mNWNV VWm++ 010.20` AIOAWW +VNN WWV003�1 tZ� Nd �m TNw� mG> > O ry co � ` aN0.. Y=m3= a ~ 3 C 6 y d O !3 52> >•• S O J g 7 n . O - ttpp pppp o a tc Om m m 1111 ++ 11+002 S t gidN O UO tA00 W O W W m N+N W N --o o o S Q G V w0 BGG W Gl Ni0Nw0 i0 V yaOm ;-0-8;+ Om O m+IV Nqm W! iONAppO� tp m§N 01 W N+N +N W N N V!W+N +W !o m N m N m V m! W N A O O 3 O *O C P g V O J O O J O p O NS 6ZiO&1O+NOO-00 D xaozgtoo`o9io28- yo3 Q 0Y p 0 g N N 0 W tf 0 y'1'og 3 N t+�pNN W W N+O toOJ W 0`1 W V aNm0 01 t-tp O�m 2J W Om Nm W(+.100 o0AA000p0 0 n W y 3 O O tT O C f m R V O NPNmN .9:4,1-1.0g ii;6011G0lt VO1N.20 4`1 OVo0m� tm!rsl! Vt O W AO03 d -11 00la cc S z m Na .. (D r r N p p p p = §01014 V J Ot N> w0+,..la m N V 11U0 L N OA10.twl1 0 "3 001 NaWOO boo 00p0 g C ;;;; ;;:;; ;;;:a.; NOtNOW+ ;:a;;; ;:;:: mu�io4 NO;;; V mm W P OJOO� O o o o +O OPtJ+ +0.0 0 0 0000-. 0(00(0(0 +0 0 0 0 ++N O O +++O Z Q O OOotNOAb W tm0 O0`D W A' AOOm! '.403k �LW ONO O+W SAN .O W L7'2 0ND11J00Da N Jp tVE0J N EEN N N m NN N N NNN N EEEE NNNN N N NNNN EEEE TopRN ssppp ppa0pppp pppNa sass- 80000 0000 NO01 g saga0? ata NNINAO AasV` WmOV+- NNA+J WOP+ !'"'"42i. 05i4 VTt WvAm+ O2 +.22 NAmaO NOAAW W'&12AkVWV0004. 8ALL LAlAA APAAqLAAAA AgAAgAAAAA AAAAL LAAAA NNV N NNNN N N P;64! NNNN !!!n NNN N NN N Hill NN3 m NLN 00`+W tg8p20 +OVOm --N`JGV +VO2N Ot.NN! :10.1:02S2 co Zi J J-4-4 V V V-.4-4 V V V V V V V-.4-..1-4 J0 V V-4-.1 V V J J J -4.....4. V .4-4 J V V -45: 0000 00000 00000 00000 0000 00000 00000 00000 VAN N w w ww0w w W W w w W w www w w W W w W w w w W W P w W WN NPY wj N NVNNN NNNNN NNNNN NNNNN 11NNNN JNNN VN rr v\ m W +wPPtw4WW +ONwNNOm J-NWOO80822 NNNNN+ Nt� ... N .. p .N m0N0 NA0W0 NtAA L0Jp0 VLWWL aWwp+ N+JWn'S t.. C A A A A A AAA A m m m m m A AAA A ro m A A A A AAA A A AAA A A AAA A ��- tO i x't` m Oom pm pmmp pm pm pm p0pp mp ppp QP ppm.mpm pm m m 0000 pmm! mmmmm §!0lp PE" mp! 000000:Lm T AAAA tLt0peSpA A A AA A AA AAA tttpp1 A gN(Al1Nt11 pNcEN!AltA tAl1N tWEl�NN EEE EN s (Al _� ,,,,�@ s• +t O Lm ogi EWE,V W W P E tOtppD ttp, I M L KIN A V$ tlNi 1 0 V V t 41 v N N N N V Jam.p ' o< r +JtmO NONN W`0 N W 1100 8422r. N Vl.2m V V w+V !p W NI D �-+ LNm JA+ :, ,t °4 o o 5 3 n 'O 5 N 01 J J J q J ,C10,4OW NW0W 0W gJ V m W 21115 mWWW WWNN paJ AW W JN A W N+O AAA N Nw +p+w +pOJW TyVWN bRRtg JWVNV WOVVN aNNNA AWOTO ga!tRV WOWNJ OWVJN pNN 81 O N Ol ro 0 A R R O+W N N N N 1122,138;t W A A V 1 T O i V pOp 1 0) m J NNNggg" b N N 0 T T N b 8"w. W N+0 0 O tNi8;1J J2,V°4 AtWON+p+ Oitbp•NA W N W AIOR W R ViNN N2I RiVr3 2t22,1 N+tORR +NARY W O W N+ -- 83 W W W N N N N N N NW N N N N N N N N N HMS N N N N N N N N N N N N N HMS N N N N N N N N HIM N N N N N N p Nppp N N N N N N N ] P Ptbp NODI AA W N+tVO N NtO n NN ANN NNNNN Nm V V V H N NtO NNN NNNNN NNNNN +pNNNR 41 t!=.188 +IJTgs OO• Ib V +T 8Tzi W W+NA W 8J W W TTo W N+N J V W +T 4JpTAb V N W W TT N01 bAT a=A J m N b +W W t W�N J O W A J O V m b+ + N P J J W A b m W W V W O b N m b V N W A N W mNNw PAH J V V OOI 'PM W NN tcn O Mil V V aaOaI PIM W N +Aa w W MI6 W N+O IHR U NA W tD W OO W b ORON+ 'PM W N W N+ +++W N +pT WJO NI W W+ N W ARN +NO+ two V AI NONOtaO 41 g NON+ 22828 A WWN+N +AA O b W V T G AN W W N W N N N 22t4'4$ W A Vb O N VV J U gN T222 w W+W "222 222 N OTIS Om2Tt NR22NOOat R V RR RRA W W N++OO wJ0NA A W N+O RRtiRT OpVOg ANJNb WOWWN NN-J,732 WRW + NPOAJ NOONT R82'2.2 42iA22 SmA+J NJWVO S R NW S8.122 0+m W A O W N V pAp+W N W W V W NST W N T N W m pmp 2 R t> A T ZO R O 2 tW T W J R S R R N V R R R N b O J m J W N b W +W b O W J W A+ b J W N V b W J O A U O+ A A O N W N U W W +b W b W 220 2 5 MA O RRAWNN+OOi Wag iDTJN TA W 7OT OmV N O N m A '28888 89888 O (/! O IV T W N T W 2 V V V A 8 t+ '1 T A A m Rp 8 RO W V W V T N IV T N N P +W+T W N V T W ' N N W T V J T N +NN N Ab W N +O W W W +b00 b b W O)b +in W V 0 N W bJN ONNNJ +A+bN W NAO W PN W>W bN+NU W Ol C J w t N 5O WwV WPN N�W+OR W ONOAbRKW N N N N """"N NNNN +O O b W J m m N A W W N+O OWN" W N N +WNJ VW0J JTIV-12 28TtiJ TNaNW ONWbN 24ZfiR 42222 RTt!OO NWW WO1JAOE.12(4 NOOWN AwANN T2222 mVJ42 +N228 27. 42 t2R22 ANNRO W3O D EN 21128 1128 N N NW JN ON N NNNN ++ aNNNAO VONSJAANPN ONAJNJ m2020 O00+A Rp8.2 AOWOA W T W W+ 00+++ w p� W 8+W O ANOJ +W A W N R V tbON W N W+W N Otmp•Sp AN NN W tOON 2R4R W 1V822R pppp ARON t ti:S IJ +I W+=N+ ail t3 E N p N P AS) N W u,t atpp A J RRA W N a t0 pwpDD J N A W W w tMp NW W JON P N+ b W J W N N A 6.;;L N N N -+ O p p p p N W J J 00011 V W mN W JNJN W OJmN �N V m0 +NPOi W �O�pp+O O O O W W J W W JtON N V t�App N W V W O V O)OIN 01 JAPN tJOAP b0 t SAA A AOg.L W OiJ Atb00 TR W N0 m RNV A 22R-98 +ATON N tOi,W V A AJOOg OINTU J 823 • N N N N N N N N N N N w Nw O O b W W w m N N A ran. N N HUE O�A W N o mJ W+N Ab A W N U N s 2O• A W+ N N W W W W V A+A +W m m O W m VO A O N T m+ A O+W NJ b A+V N O w2 0 J 5 AO A AN b TJ+ T N W =1'4'488 A A A W J 8.2T W W W PAN N N m N+O O O+0 0N O++O +ONO O f+p ONO N O N W N P W W N N N O N+N N N N W W N +++0 0 s O O TR V N mRNPOif SSA V N2 m VIOIOi1N W W W 5 V Nb V NR W RN+N SRS,118 V POINJ ANN W A RT ON WW OA ` EEENO N N N bU U N N U U bp NU N U N N EEEN U N N N N N iJ 1NV b bWO bmW b b N N N bN b b U U N N N N N O ++OONOb 80000 2082 SOON OOW5O 99999999998x888 88888 8888E 88888 A+O+ NWWNb WwwOO WJOmJA 4bWmb '2AON bNA ANNmp bJm+J NOA}}- UOVbW 2= 9.728;.1 ATNN IVbV28 WV2A8VpWp NN 5O,W V28W NwT��O0V 11 N5N NNVAttDpp NT_T TOTA A A A NAT '128,"2,84 +AW T OQ4882 NN05 R Y WWWW WWWWW WWW AWWA PAAA> m>AAATAAAA AAAAA jANNNPPPPaNNNPP AAqAA ETORN JO>TJ WT�wW AWOJA 001W NbJO WwroONNWW?a NN'W WOOTImT +OV NNNT ORmNR A+NVO +Ab>N W pap W W 2 NNN+1N0 8. AO V N++W Wym A J J J J J J J J J J V V V J J J J J J V V J J J J J J V J J J V V V V V V V V V VO V V V V V VO V V J V V D 0000 0000 00000 00000 00000 00000 00000 0000 000 00000 00 0000 0 j ww w www w w www HMS MVS ww w ww wwwww VIM w w o �O ww MVI w www N N N p ND pNwp pNppp W NW N N m N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Mt*: N N N N N N N N N N N r grE ONaa W W NN +W W 2+0 two NN tVONNNN ZdaJJJJN NNN pVN� NP ottilAA A V J V V grgg [N� p W ± p1 W b+W N W 41H §E W O HMI I W JN W N W m wN+bR NNV01p1 OGdO TIMT,A mN V Vb NN W W W � tbO N W N N W Om1 W+ O 5' iT A N m N W b O W a N N PAN W OI ON1 W N tO .q J O N m b J J m b Oil V J b b m b W N W b V N N A N O b N+W W N W N O N a a a a a a a a a a as A A a a a a a a A A A AW pap a a a a a a a a a a a a a a a a a a a a AAAA A a a a a A A A A a a pppp pWD W W W W W pD W W t Wp W N W W W R m W pe W W Opppp W m T R RA 0000000101 �O)Oi Omi OWTTN TT{�TTR ROWlmpNR V ttttt W a OJ pp'o W AO•N+b b W WRR E J V 01 5 A A 01 01 01 Q i 0 t &VTR fNP + 0 0 b W W J J J R O I N A A A W am+ "g"NW W NOO NN tc`li NOTO tip J+A W V OIN01 .�NII W V+a W NpVo+y � ppG J+ N N m N T m W UEEE J R V P A W T A V N �m O tW�pp N pWI N N a O pbp T pWp OI N W ',131 OOINA v00 V N W W NJtWl1 NN V+t011 NN W 00N NwNaaa W NOOT V V�tNO(,J UbN m W W NA W A W O W V Nm W V3 6 A W NAT A O N b W N W W N W+ N A O+b N.:q � � S tC b A T a Of W NJ N N +++00 "8" pp§OWSO J O S"S O 2 A A W W N ER bT N A N+ w E J N NOWJN AWVNS wAO+S NJJNN ONJON WOwN bwOWW WWwNNWWWmW WWwWOQN WNW+�A WoVWAJNWbpJAVC WNWUA +O+VA WOANO par.,-e SNNNDC NNOWp O bJ W IAC W AS 0W AGON OS+SN v25 W W W% W W W J V V V m m m m U U U ODU DD A A A +S V OWC A N S S N Nn U DNi W N A W A S W S S W J V Nm V V V N N N SNA N o W W W V A+W m A W+W m TTOgg m A O W U2TW SgSST WVTWV TSOOA jAVWW J WN WVWUJ VmA+iD GWDcgAGW VJOa2 NIV+2A gqWWWm Ae +N m W b PUN O W W W W A +O+ V N ON W J m J V W m b U W O+O A b 0 O+V O A W O W W U W W W W m 3 W W N W W W 3 W W W J V OD m U U A W ++O++ +O++IUD UW o S 0 0 O O W O N W A W W W W N W W A w U U A A+N�S N PAN+ V J S+J W TUT ggfp2g V SSO W A tom Nt JG V AU (:-9,g(,JJ +02T W OTiC UlJ W'iv,1 JT+W T AAO+2 T W Ng W A e 2 W+O+ N A N U V O W W V+ W O m V U W+W U N V A J U A W V O O A W U V A N W A N N W b N V J W W W W A W N U U+ N...,q O O O O 5000 0 11511 WWNN WN+SV 11112 WSS2A N 1 5 11111 bASWN VeY W NO N 11211 A g AtiW W+NNW O9O+G QIAAAJ myy42W 9284N W JtVO U+W O O S+W 100 V W W N2O 81m1NSN+ 828g7.4. J?N 8888 00000 bp0 pp S O O N WS Sft�1 S S O mW m W V V V V o A S S VA N mO m m VV A V A Y 8 U AOWWNNNSAJ O+O+N WWo AWNAV NmW0 CC12NWN �UW VNWW JWN NSOA NWS0N JASWpAO +-TT S2SmS AVVtW +AOVONmSVV SANUS tWT StADINS V 0V N W SS INDNaJNA A'+� y• N N N N N N N N N N N WW ttpp p_p oo Cf W OJ W n n pqp N10 n WW N N AO 00D mW OmD IAO W V+��N GDS�J V J W SOO OSA�OD N W NNI+ b V mN V N oSQ U W N+ m W J m U APA O A�Up A J W W J U J O T m pp 8 S W As, OVDW>WOS V A W+V W NCOODt 2 S W W m A 010DNPttS v W m S N UNNSb W NN W S A W NA+ A ONAN mW JIWOO W ro2R w W C w D5\ NWV VN iCJJ UWJ O UU S m tAtpp AAA AWAl W 1111,1 A NUV A A W J J WS S 1 W A A A GA+WG AtJAN SUNtV WVppV WW +a SAN+ 2428N NJWSW J _OD D C N OO NttOppI SppOISW J SSS 1111:1 JJ JJ 11511 11111 11111 P1W1 W W>NS 45111 !E151 11111 + SNWNN JOSWW NSSNmNN+AO NNNNS bOANAW ooANOW 8t8 N W N OttV. S A3 a N li C N N N N N N N N N N N N N N N N N N N+ W RE 8 MA W W W N NN+++ OOOO W MAR ORW REH W NO REEH tIt tWJ I'nA OOSA I§F,RV V +S f mfJJ J tml CI ANN O 0 0 N O� O W S N S O 1 N O)N m A U V W W J N W N U J W W A A U m J CIA+V W W A�W J O l W U S N N+A W m S S m S IAC S W O S V W W N V W V N tAD 0W A S V W•AO 2,144S OV tSD W A N O N V S N NAW S+V S JAS W A N W W S O?W W W W W W W W lJ W W W W W W W W fJ W W W fJ W w w W W W bW W W W 2 W W W W NNNNWNffJJ NffJJ I!JV NffJJ IIVJ NNS W W NN +D UmAm �NmmW >WWWm WVWWW mSSSS WSOt SSNWA GgWSN A0OWV OWAUAAmWW J NWN�D V'GOCOTW UT 2a G JAPA0 24 WWW +IV WN+ OAm DCN JIV JNW UON TO 0 Jc a-11 m A W U O N + A O O W N OC+A N W A W N m 0 +J J U U W U O W W b+U U m W O S W A W+N W O J J W W O O V W O J.�Z W O N U W W+m W A m o J m .8... WWWWW V m m m m ..... O+A o+ ...-0 +O+00 "0-0. P A W N W W g 0 A A•C m W OO W +m A W N W gS m WO W 48g81:1 NTTUi.D W C+410 iOTSSS J W AA V V g T W�D mU ODO3r N N OC UW W W W++ U J V m m S S W N W W O W W J +O w+W W U W W W S2SSS O N +W N W+ W w+W W A N N m tp U U U U U U U U U U U U U U U U U U U U Elm U U U U U U U U U U U U U U U U U U U W W W W S SIG S S IG tG S W W W W J J W W W b W W W W IG iC S W W W W V J V W W W W W W W ^JC V V V V V V V V J J J V J V V V J J J J V J J J N J�D V V J J�D J V J V V J J J J J V J V V J J J V V J -L N N N NODNW N N N V N NNN N N N A> GNAC A WIp W N N N N N N +p O O pJ J m m A A W W N N N NO A NA10.CN A oo111D m W+IVO OUC +GOC JU W JDN ANO W J W W tC W A HRH A mA+J W EEE N W 1R W + 7 OC N m A A A U J O W J N W N U J W W A A U m V W-� OOWm TJ U WWo 2gW+2 W N mWTA+NTV =SSTS SO0 0> OWAN+ +V+OTO OV SOAWmNA m 20g EMm W W W W W W W m W W W W mamma m m m m m m m m oc W W W W W W m W W W W m m m m m W W W S W m W W W W w w w w w m SSW W W W W W W S W W W W S S S S S SSS S S SSW W W W W W W W W W W S SSS S W W W W W S W W W W W W W w^tD W U W W NNO W V 444J4 V NNN V 4-1-1.1S WSSSS J V J V V V JJJJ mmmmU T A NNUNOW N+ Nm+SO Jx q p p� Ip W OAS W pIV 1't TAA CD2 CCNAJ GNC W N W O 202 W W RMSSS b g-Ti W S W+ N OWf W A+N OA AAN +ANAA AES O N W W W A U W m+ OC AAA J a • 4448 JVV V V V V V V V V V J S44S4 J V V V VV J J J V S V V V V V J J V J 48484 44444 VVVJ VVVVV V V O S S N W W ww w N V N UMNW "1,1" (✓w W W WJN w W W?W W W wW W NW+OVmJ � 482 Sg2244 p0U00NNWmt"OWpWWWV +ANS N + W NWA mAPmW ONmAS WmWA N NNNWAJan: NNWWV NON SNNN SA W W OAD AW OAD.OAD OAD OAD W OAD OAD W: W AW OAD t W CAD W m W W OAD OAD W W AW AW OAD OAD OAD OAD OD W W W OAD W W OAD OAD W W OAD OAD OAD OAD AW OAD AW SD OAD W OAD W OAD OAD OAD TW HMI HMI WTTTW "5!1" T TTWTW aTTTT TWTTW WWWWW WWWWT V V V J J V V J V V V V V V V V V V V V V 33 V V V V V V V c4 V V_V V V V % v �f �V oV q • 0000 00000 00 0p 00000 W W OD OWD W tWO IWO tWO IWO IWD O++N W d DOi V V t00 N W m W N ANONDN OND ;IV A A W jN Gmb A 3 2 N�IVC N fpm1n W O N A N�tOVC tOC W W W m W S W W pp pp A C fG W UtADO AN W Nm mnWDU+ W MOMS OA W mA W Np+1 A W !all p�NNNA AiO�AO V W A V m ;00V S(nm J W m+W I W O W+W W O W W O N W O+UW O N m W J b+O O J ON m U W V W U A U OC A W W O W J W U O W W N W O m N W O+J N A U :N a U N O FC -63 1a s v0. O o o m m 6- o 3 � �o N _ p °i r m m m m m0 P N yy C• Ad A W N+-. ppbt.4U 22 O14o 001 WOW CO m m a N P ..p.0 m O m m 0 2R 0 W O O m N + ioM r p 0 88 2222.4 0mNAA 22222 V q+A A w 3 O n J A N m .. < m. N m mQ0N.p�1f D r0V O, • P• PNO TI A J74 V 7474 0,0, mmJmm 4.N0018 22713 8 W Se, OA N V mNO�a O m bA+Go+ io IJJm W t."3.71&&+ m�lAmN O o O r A 0 0 0 0 0 0 0..3 Y N N N m N m m A m J m+ N N m m+ m 3 a N m :L..m NN+OfaONm 0 Aal NO-iowa. o w wwww www 3 N m m 0 b a A 0 tn N N tO!.N N N N qq(0,.,1� mV V01 V Vmb+N w W Am 5,''.1.0,, to V MZ C.000000...0 N V NOl OI Oa V 0 am W 004.V W 0,40 N ppm V spp akN W+ a1,2 CM +0000 V P 0 m+ m WON m P m W O • S m n m• = C m a 3 ©©©E O m1. mmmsim 000, 00 mm mm mosso o , Z40 m J T O M 0 W Z.123122 A N 01 V 0m 48.9" T N PP !O b W V b N O1.W 01 PP A A Oo Q x j 0 N m W m A O 2 W O O t m N I V.t m Ol V N+O V 8g:g N g a C C • N A m A N W W N A J J+ N m J 01 m m J N m m N g51 2 m 4N1m S m d A 7 cT 0 aC. (0 o n MD.' pa mI74m mM mo EI 181b b oroDa. x 1. 7 NNNNNNN O V m m0A m mwmow J o+N+ m: A t y OO2W3 ; a ti aV•m•m• mV Nb1.00 0+aT2 NW:A WW m km+W NxO m +Gmr O VN C 0. 4 0 C O .. tr.. .... ONN ..... + OmmNm bqQ G NNl >OG ..... O- m ? mmmmmN 2 O .N Ow mt0l0 +NNw AWNANmON V G O w mmV0 � p e0 mo00lN0V amWNO m.8tt'S 'bmOA NV0W OR w • 0. YG C O 7 N N z F• a ..O.03 to 0 O R pp Ya. r W NN..T...mm ..... VJ WNNttAA ..... oNW 1. N AO OW2..22 papOIpp4N O ad 0J0 44Ca0o . 000r ., +V WWb tam . Nmmcom 740W + m D VqNWONAmA 40V _ P. 0 0 01 ... m + 1.W-4 M. O0. V0.1. 0.,0 L 0 D ° O mN L lSZ; Z A A J AA APV N .... A AAA A A P a A WWNN NN+++ OO O N JWm WW O ANmA 882 74m .NpmJ f O • • 49 'c mm yU++N JoWmA NNbJN JmANm m23 -DTpTGON zf1 ( • 0 �OyO�N N Ay N P O P WN gfE4g Nf N bJmJJ JO mV Amm N W AO� O.1 A{pp OO01NJ+N m' mm(NNP N ;,-111 , x b A V AA A tt;i Nm Nm1N0.m w+O�ppAN 'T.s Y W W W I.4444 4 W W W WZ./..Z44,W O tt OOowIO� c0 !G +mV m o1.>mlNp 1.000(A.1 V bm40mmmb m UA V ONA1+ tattoo o0a0 P+0 V t N?* N Nm m m m N N N Nm m N N m OP +p O+N N+N W 0. ,M0,-.10 m J m V m mO 0 pO 0NAN 0W+Om V1.OW NoWN+ m?r 0PN ..... 0 OON 0NNNNN N4J0 N N N N ..... m ammmmmmmmm mm74mm mmmmm hi mNW0 +NGOmmm OOmmN m W W W W mmmm+ 0.0.0.0.m ommmm E b0. bb0ON NNNN NNN nal N :13T JOAJNpm mWNAWAON wAJW+ W.N.tO m A o0 0o000 00000 00000 00000 o N w 1. .0ww i,W w' www wwwww i14,4,4,w w • ou40lulaA41 .�moo0wm0JA2t mNtW O0 � NA0O0 .EW-718 O S mmOmmJ .4pN 81. WTNN tOm 2 tt + 40NJ2 m_Os t . . . . . . . . . . . . . O w A m m A A A m W m m m m mmm m mmmm m m M m 00:40 . . Dorn aamaa a'EAttm aace setaao t r po Jo oJV JQs O pJp oo po oJJlmo�0� 24822 oJ ooJGOJo 74 to N N T82.4 V OO A m V V O1 W w A 0 w V N 40.0 W 0�0 0 A O b V m V A a A O A O g p O O p O C G 9 0 p a g 2O o m fi li kno n 3 m" m -n o.a j d a> > m S m m ; a w m lag o o g m _70 3 m n , n m O m o 0 4 z o m o O1 - ;":72h n `2 F o• X m O m W A m j N w . ry O O P ♦ NNN qm 3 5,18 WOJW WA8N S88S C2;NN ml+mtl1 NNmUO000.O 8+0S 313Q2W AA8+W ANZ12+ 00WmN +WmOA 18888 SSSV0O o+ z�OV NAyi -AWO 2vg mw0ONWD0G C pg,' ON P wm fO1dA O N , N 0000 OO+++ -.N.-Pm UUUUa AAAPAAW4WW WNOO 00000 NgWO a00 NOVO tWW880 tNmtN NW+O2 A8488 WONAV V00JJ AmW88a w0mw w om1*mytS y + N;s w 3 Nto IMAJNWWN w+NN NNNNN +Am+Jm0 NNN8WJ+N 1No0 J 1GOp sans 80;82 Attar JVWmW JeO+q NAW>+ N+J2B w8N88YA oNpg Co1Cw W J W p>>p�1 tyV� > N ppb N (q��p1>,1 J O A+WmA ;ODNN8 8'288A 2;MSS WW I; OJWill N+DpVNW N�J y< N 2 � 2VV p W zgtt288;."2 W S O w i0 8Om V W V N O Ow ;22:28 O:1112N N W W mOa N LO V) C A2Noas aJN ...8. aWPA O1++82888:1 80 W V JmmAcj N-..-.,,,OUNN WUNWU i8t288Nm8 WOJT+ JAOmw Nm82O m-8.0 O *G S W A G W 55428 P S zi24 8;828(p yy W A+w N mm Oe V 2S W S88%82 ^ WWW+ mWJNm +wJNJ WNwNO AOJAJ V WAmW mpOV O....O y Y/ ogOa 3Wm.gm O m n c C !D y m 6 10 S m U S C C 0^n z i C q N 'g m A p o .11.m. .m. .L7 w 6 N O�� s (D O N - 'm O l t'P 0'g 8 t•T Q pO O O O O O p O O O e e m W J J 8 m N w A A W N N++ 4 3 m ry O O �_ 00< ; j ± ^ Oci 3 8 J J W W m J 8 w W m W m W V+g O O U O w J W W e N e w 0 0 60000 m ; 3 0 0 9 + 0 m O 't W o N 8;82 OAU W W 8 V NN m W V m+A W N J U8 GOA W P +Aw A C W W 88 J m 2 j q D Ol T O m m > > A M p.0 ? may»OmYRk3 D a , c0mcm39 -0 C n4.. ' m8. ' ? 0 m a - z S oV2JppWJNNomw0ONwwWWWJwP WO OAm 001 t01 . w+waN ++000 iQ 8 ;iON 8WSw0 +NWN2 VVW2N n8:1a888,1S N8V4832y8836 C *op-1mo400,�Wi,JiA°+,* 2 m -M8 N �z mTp N m O m 8 0 8 0_S > mT8zgm w .28 `� 3 O *i'-','" i N N o A °::V. 00da 2 N +(+tpp NtNtpO W W N+O S2 WOD W OJD W+N OWDN mt2tpp V+OI V US8 Z..-0 000 popp . n o .F', i? g O m O D 2 L 8 W JO M.I Ntmn V A V 80 imp tAif ON 1VOten J012J0 W oNmN az::: OCAOASOx 5 i0 3; ?Z C r 0 v N t° 8' r u n m ? m tp _o_p_ p_ p_ {� m 888{p-9 -9'.48,82 22'468 2:1:188 A tA04Pi(D�8 OON U;8 N W W 000 60000 Opy C gas: +NAOJDtJi1 JOA W N tDO8;= 8SN W w m+mtwnm0 tmn+O$tt Stt 8853 N a + Q m m to ff,,JJ AAA> AANalOi 0W.lig NN20z17-gr-Z=., mm..,..- 001.66 06600 8 >888+;,'N mtOwW S88;8 8;z1;4 arm—T: JmSWSOJ288 32 a0-0.((�1 +0 0 0+ +N 0 0 0 0 0 0 0+ .....O011 -0-0- ++N O 0 +++o.o z O O W>rN0 OADtmO W A N OA W 8 t J O W NA W A020 O_W mAN 80CWO++ OND+JOi.N J N J N I p 0 VtNO V w N N J U U w w w w w w w J U 2 m w w U 8888 88888oppppawe. 088a vaaas 2Wra§8 :an: ::at,': UNVaamWJ+ WW pW OPNWt oAVN vaV88 a!!Its+ 08244 Nyy8TO NOAPBWt'mmta VWVti�O rcon TATA AAAAA ; 88 PAPAA APAAAAAAAA AAqPmm A8mpP NNN. .NNNNNNNNN NNNNN NNNNN NNNNNNNNNN NNNNN 1 Wn: D PAAww :art::ttpp NW N W Om ..... SL1828 0000000 22222Oa p NAOJ ONI OOtmir+tmn NBmAN +0-123; +tm0 V 2 V +V O VN O+NN W JmP V 530,1 0 J V J J JPJ J J VV V UP 0 00 0 O o 00 o• tonW 41 (nnnW W toNto J JJJ J JJJ J++NN +O1N0 W ON1 N4tj{W{pppp2O8pp .A 2.mNN NN VON ...%.W C N A S A i0 A OD OD N trap E-2‘4,1,1 J O N tAD A P twO V S O V A W W A W W N T+ N+V m^6 _ fY W A ■ 1% (D r • r r r r r i 1 i i r . . r • • • • r r r r r r r r r 7, A A AA A W t,A P PJ P W t m W W AW A A mA AANA A m m t m t W Am A A A A WA . � G u ApAppAAAA AppppEEEEE AApNN0ANN � " W0 + UN 1NltnUNmi R W imE AWWmm Wm Nm bNA 02W 8V8S+ NWWWW NNNN r D ppJm Pm+J0aw8 U+Nga WJ+W m!“.41 ONwU SN8V,6 0 NO4F'^:;�+ 4. i Itum 4. D b o 3 3 to w N O) O) O)O JJJJ "Z1,-d2! :16'J W W W W W A S 'aggro a O DrNW 0UJ A W N+ y JAAJ JNppApp WW O(Ap SON W AWJW OJOP WWwWJ VWWga NOAtwAOAWW 45's AOWJ WNN 5{toDp1fWT=N((ppOV��offf gWA W+W WpwVW WSJwWNA WN +N AWOTO gO+t9 WSWNV g.„. NU .a0 ONPOI vat W SD Oa W twitA AAN W OI wJOOOI1g9p SJtlwotwll gOWiNN�Wt�I1 W�N W btwl�NOtmt�.11 TNNb W AN W OI W N+00 T NAV J+b Nb AtWD N W++ mNNA W N W ATOI W SNNN N+N W N tp2+b N14IJDGWo01 W O W N+ 1°42c1,1; b. WJ OS TO T+V TNJ TWW NNb"OW "M"M" TTJv MM""" JJ V V + MM V JJ W-? Jv mJ22222 JJJ JJJJJ N2n1 ;TTOb OWAA WNbW JWWVW OWAWW WWWWW WJJJ mGSW O2OWW WOWPW OWWJW VWOWJ WWWW+ JWVVW WOJVV WwWAtVvSOWV • T192WA2Nm NO W Wp W OI ppG W W W W 444" WWW W �S WNtwo VWW W g w www SW AA A A ;A AAA A A AAA A j AVpWWW W W W W +GNCfWPN N wSOW% ;3AOOSN NWWW+ vPOPPP WO + +A+PT JpNNO SONW +OW OWAtJAW -"2-"202'2 AN+N+ 0UW,?NyO NVNNW W b W S S m V OOwwA P W Op N bW JW g W OW pbWW &TSNS WWAWg NNO�D+W WAOAV tJ00NT ,„„p".„ NNtAp VWNA WJW TW W SmT OSJSJ +tOONOWJWTOJWW WJO>W O+VDOO TN NO ▪ GwoNN W m +tVOTtAOT 93O • tO�It 7OO JIOWVi NW+NW PN IAAV ObJ yfW.J+VN) T+ W++WJW GOO AOo NAb+WW OW Op01 vW) +S JWW VV WlOJ tVN NW Nb WIVV w mo, A SW A NN ?„9???, NNNNV ++T+n WWVWg O+GAg b2N1V S GbT W N ••G C 7 .i' C NW + +OS+N N N NNN N N NNN N LIN N WATS WWJPAJ NNONA WWWAOVb�N J W W A W N SrwwW SNwwSJ:e.p91I J+m7.5,0 O ttpp D JN W OI �W WOOD OD W V Am V W V + NtW00 W N A4w1 ANGJD 00 W W W S V V V GWC +NNA NASJtO AmStWDN ATNtApO W� D CN W W O NJ W NWN :110] N NNN N++++ A W pp+ M E E JJ A 88=== '�ANW WwOgN WSm T P AAW+Wst W _RlO"! N t 0 W W A A PA W AA W E W A W W 1 Eln 942 N W J++ T N+O[n JPA N IV W b W .*+-gt A'm iA O ggOI G+A WO ktgN g C WNW OW V JN S n N G W V w A JV O+NG WN NW+V W x Z • N N NNN N tT NTT A W W N+1 O "L"V W W W P W N +0+0 10 V W 6 N aL W W N N N+ +O O W pWp W W V W p>� §W E W W W W W N A OI W W Wp W N V W W +A O+pI tl1 +S W W O A A W W A T N W W w T O A N(Wii pp W NW W N N W W A O W W N N A N W W W O T A W W +W W OA1 W N O W IOD O W W W A S°W J S O W V N S tp J W +SAO A O V A g V r N N A J O N S V W 7:122,1'8 O J A WW J W? w W W W W A A p N D WOII W W N+O PO-)OO N O+-p O +ONO O +O N O N O N W N P W NNN O N+N N N N W W N ;:::j7;22 0 O O AGWCJN WW;t P W N+V N+ WW JtwOSN W+C W O1 V W IWO V NN SAS+N twC1AST W JOC2;J V ..OIGDA NANINON W W W W a?to OWVjt WoW SJ WW W WV WW ID W WtpWtWp tOO WtJp pJ+W WA WpOII wW IND W WV WW GwD "AEA wNwW J f p b p w0 p p W W VW W W W W W W W W ftO f0o O0o wV SJ w jJVV VJJOOJJV NOSOOOOOOO OVOVO 9000 OOpopo Haag OOpppppppp pppgpp W+bV OVSJJ JAWG +7O+4tANTWA J iAA P$':!1:1“:WNNAp +ANmWAS+SV OV W O GWC S wW A N 10 A IAO N N tOli S ip W y Ip V A t>t N V W W+01 WWWW WW WW W W W NWttqpp W NWAW wJSANw W W W W W W W W W W EEE" WWW A A4 A A AAOJA AA AO PtpOAppA A NW A At�W A WN AOwbWPAH wAATJJWATA WOJWWW ApAAI NApAI pAAI pAAI CCJ W W w W GtJ GO IJ NfJ oGo A V V P+NP +IV W JG V)G GTP�C GGJ W A W wPGN W +AAO W gi:2 V W G++W P N N b A O O W W W W F N N b W S S W W W W V W V N O A+W J O +A N A N W W W O N N N+W W AAO J N++W+ W y O W 4848 OJJ 44844 VJVV VNW VNWNNVNJNNVNN oLAJ+V NV VNS 88484 VVVV 0NOi 0N+0NtO 0wOD JiWu iOlJ VwJwJ Vw NOmONNoNN00 NN 44444 T VVVVV O O OJJWT W W Milt',W O wNN NNNN NNNNN NNNN I WJJS ;.A+ 4EWwNOSJWJOJ .WOSSNWWW C• WO WWOW EE OWO NNWWW AWVOOSOW+ bOWA+ gNNW �^N g. • AW AO ANAtWO AWD AGDSoI AGpSpo1 A�pVwp1 qNApWA W WNW WIWiI AtWPO WW t5tN NAA+p AOAO_AtO ALAW PLAW AJAO1A01 Atw11 A AAA A AN PNWP(Wi1Ao PA W A A P APWANPP PW P NPAAAW AA AA O AW WAWJV Hill AAA apt a JW mil WWNVwWVT JNmwm Mil WJOWA mJTANJNWO WOO W wiW w,A D e 3 5 e 3 a O1 W NNN +++ON 88888 m82JJ 98888 8186 22 28882 88WNFOR 'S0JA+ N0+JU NWUNW 8TJWNNJWN OWJ W80 .OJT OW WW W W OW AW m W WW JA J WOW WNmUA +821.18 EE28 88 ;;IWOTWNB 0m8 y8 CODAOOTT OfW0282 Ax O 00180b JA(ppmNN V.01-ITT A+IU00pp�+ +J A W O W 6A +IWOJNA NOmJtNT NNENTA mANpO+V EN CCJJm ,NEN UNEE W m m ImTCWD t +NNNO W W W O A 2E281: W ON 8Jm J��8 N U 80+0 W N AN O O pA NO W W 6 0814N1180 W N O.n 3 W JJ W BUUA W ++0++ +0++8 801000 00DUO ON W W W W W W N W W A W W UUA A+N(UOb BRAN+ JJ an n l J 0Tmm 'DOT808J EEE W A 481 W TiJA JON6U OT W +O W O N V UN�1 T N - W T AO+V w W NT W >� 0+O+ A N U J O W W V+ O W J U W+ N J P J U A W V O O A m A N m W A U N W m N V V 6 8 W m A N N m+ N.. CM; b b b ffpp t1pp((pp ttpp W W W W W m W m 8 W W W W W W W W W W W Wag A mCyO W W m 8 V J J V pA VpA�1 fp Vfp1T11 J J J NN�NV1 V(V�m N W m W(p W(p�T 0000 OOO Sb8 PAM m <p�1 N D N J W W W m J m a J N J W+w A w W ANISID 0 W V 1+A 8 N V N W W ON! Ol NUN A LOUD g 8�O!O W V UNDO NO W AN ODA+Q+Cpo W MIR W N W UffOJJ UO W W�N !O (1� A+IO.1J N+NNm O V O+8 V tApAP J Np+�W +O JN A�W�� U�1N,100 180+CW0100 t W CONN O ONBN+ m NON J V?N S+1EmE,OSA NNm m VE00 00880 ET ET 88999 8VVJ V O000 vTET W N+OIJJNJNNA W W N+O Nm9 J8 W mmO 8N8A4 +08.0 >NVNm N80A N8888 W2N+ 1 bAmNO VNOWA2028+ 28TENWB++A 0+080 V02q8 N80JJ 064tmJ Npp 92 W moo mmJNA �3 D EVEN m mNW W EV'p08888O J JA .7.)74483'18A W 88888 J N 8V.7:888 W 888.8=== W + 88... 8 J W N .O A W. N+E 8mVpU ATEA. AJWWJ UJmO 800 =2+.N W8+JJ J8W8O OWbUpNWNVWNJ 0 88A+ NWA00JAN W 8A 18NAONAm 8JN0 W 88 n C J .Z' 5 UUU gppU�UUA AA AAm AAAAA AAA AA AA AAA AAAA AA w W W W N N+++O O1WO1w0�D CWo OWOJ4" OINNAA ` v N A N l0 GO A N U 7'N m W>V>V W m W W N m N+Ab ♦AV AAU AAA AAN+ b + 3;3!8 * U N m A b U+m N J W W U O m N m A A A CWD W J�J+ W O N A m N V W 04,2P0 m W W 0 O m U+J N W U N+ W m m U A O D OV NJ JD CA+W C Tit-1W2 m+W PV+ N 828 G E489-t. T+mm+ TEW+O m W W W Awm+T+ N JW O N N V AAA S :43o p p 0O • MAO: O O 1: IWO IWD tWp f0O IWO CWD CWD m w w j V V V J W V J J J N m m N I A V N N A Cmo W J W CWO A N IO J J 10 A m W O O tJO N J O W W N 1+ M N O W V UPN+ b A N 8pD m U W m m N 0 W O1 ' N tp N J� A m N W 0 N 8 W 8 +V A 8 U A W W .8888 $ O 8 T 8 N WU 8 0 2T N V V PU+ 8 A NJ W W U A+TO A W+J N A i N W N N N�1 N N N N_ N NNN+ '41:1 fp,J�W W N p1 888 Ip W W W m >p8m V JJJJ 8pp11 m m U Han A A W W NNN+ +O O W W J J J N A NN O 0 01 0+1 O W lwO lD W +1 H E 2I W W A N V 8 W J N COO Wi W W H a W J O A+J W m A+�D J 0 W m W N m NAA m .t.8%.8,1; tA0 O W O N J W'26 V W J N W 000 A W J W N N W W tJ0 m N W A N O N V iW0 N N W tp b J N V A 8 W A N W W 10 *-J23 W W W W L,66,4>& W W W W W W W 4 ,431,14 W W W W W TETT +NWON TETTE 998888WWeWTETTE O+NWbNNNpN pVOWV O W AW NWW NWN UW+WW W W W W W W 2'48E1 T 'VETE VN 8 O T 2 "1"-alt 'TU 4U m OW WW iW N T O NW I C ++C N A O J W O J J W O N U m 8+m m A m O J m 8 0 m m A m 8 b W 8 J W m m m U A U U O O+A O+ 000-.0 +0+00 N O+O N A A W N W W O NA;t*' mbOOT 8 0 m ;2E88'9 J+O+O NETUW WN+WO 'giro N U N U U U U U MEI U U U U U U U U U U 'WEE U U U U U U U N U U U U U U V J N J J J J J V J J J J�I J J J J V J J N N N N J�I J J J J V J V V J J V V J V J V J V V J V J V J J J J V N N N N N N N NNN N N NNN N N N N N �1 N N N O oZ (Co W JJ V 00p110 {T U AA AA W W tNtppNN NN ++ poOpo eJJmm UfllO W A OA W N+ OOOAiON +W O,fJO W +W NNOI AAAN V O W JNm NN J W W ANO1J OIA+J W WOIAP+W J N O m J U *24,'41,4 ♦ p� �ONN JAA+O 1wOJ AOOOD W +m m+tmpm A W m 00 +CWoOAN 0000 S W JJ W W 8.=.19T.9 8JM0 W NOWiOA O +Ne 8mm m 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 00000 8 8 8 8 8 8 8 8 0 8 0,0000, N N m 8 8 ELM m m m 00000 0,0000 m ID mEEE EEEEE 1WOIOOIEE 1001WOIW01p 101 EEE 1pN08N 80180 IO IO 8 bpN11010 IE SWT ttWnO tW0 tW0 tITp1(WTOIWOIW010 W IOIO1wON m TETT NNONN IVTIJTNIVTN NN t000 V211:10 NCVDN 100E V:1:10-01 U> N O TETTE OIAA>OUi 8N W N+ 28:120 oOPN W 82a'ts TATT V T UG W N V(DN(T ao NAiO W W U 8U V C W JG W U JpmT UioTUb Ay N b W +O+8 W A U W m+ 8 AAA� W tW0 N W O W W W N W N N e 8 e V W m +W+O N m W P+N O AAA N +A U R A b 00 AWN 0ANJ JN V187 84-6'44 JVVV 0 0 0 00880 JVVV VVV00 V OV V V V JWV JWJ JT Va JJyAJJA J J V J V E0 0Vw0Vw0 Jwm wJ N NNwWWW WW mimuw +NAN VtWWN 7:8402 Wp UO+A 880 EmwNm �WN88TVNpmpp ENE-18 mmJ+O NON HNAW JNW W8 WAm ABNJ mNANN Nara m+pNm 8 36ry W W A A A AAA A A OAOCAOCAOCAO A AAA A A AAA A A A A A A AAA A L AAA W W W W W W W 6 W m 0AD W W W W W W W m CAO W W m 8 m mmm m e m mmm m m mmm a W W m W m m mmm m l0 W W W . TW WWWmm TTTTT titin nitIn 08080 WmWmm aDTTTT TToe TTooTm aDT J J J J J 1p Jp J V J J V J J J J V J J J V V J J J J J J V V V V V V V V V V V V J V V V J V V V V V V J J V V p Vp V Vo • U U IAO O ME A E i as 2 2 0 8 8 8 8 8 8 8 8 8 8 W + J +N J t80 b + W 0 A W W 8 A A +N A 8 m m 8 8 2 8 8 8 8 8 8 8 pN 81 8 8 8 8 8 8 8 8 8 8 8 82228 00 01 O o O 28228 W W W W N N N N N V N W W W N N 08+8 FAH-8 NOl O+8 ON l tO V 2+001 ON8610 V m UA N W n W O E-Wig O 10 W N W§ NNANB O+JN A UUi�N a 0o V' o c c 5 4i 3 vm c m' a N 31 0 _ a 0 r 0 E.tl E Of Of O O %a N A 2 N N+N 2 O OV a ..... ...4".. It 02.,4% 2V 2 28 2 0 OOOBOO JUPO 8282 ,-J GO pCPWV OTNPP 2822% 2W+WA 3 n N A. N tp J n O y C N a ry 0a000C2V O .ZI mOti OC N ' c -4, N V W m wW V m m ....22 22222 2 71N oNwmo_o I 22 28+28 22VV2W 82w88 2,82+ 2.73 V m (n 111_.4 w N A 0 r M o ++ vJ wo1'�O122 w ..... 3 m Z N '"O1O O o 22 24424 28+ ...4.. a.-Jm,, m -1 O EJ NE mot V n 2-T, T Ca NzI 42,312T m J 2T 22�I 1, T+2 W 2 o 0 C A 0 0 0 0 0 0 0 0 +O V•W w V A V N+ O w 0 u o +A O o W 0 O n m a.c a C a ©©©©: a a y m © m N y Oo g 0o m 0o W m ro w 8 8 8 8 A N 2 V 0)028228 22 W V N ai+N 822322y 2000000 C 0' W O N CO W b N O�w W O N O U N O. O m % NA 22822 2224°. 22422 IVO22oC1 N=N T53Z y n m o F N O a m N a t. r. N C115m m m -w O O o CO3 a C. 0 °n°n°°° c nom moo Co�o.n 1:1 Inn J J W Co o b 0 Co O O O O O o N O O O 2 O O NNOI fnNNOI O a70i O A+ O W V W AN+ �O V d�O -i O n c*4 r O a a a a a a a ,T2'. 82288 8 AA2 2423:24Z1 O1 A at W 2 x 0 N E-' ,1 . 0 j g;-% t O' — N TJ m1O p 3 C G , 4 1 G Z ++ O (aI'61 G ::::: : m W 'a,”4.^4 NN 22222 NNNN m 7 y (p 2JWNV +V200,4—.. AWOO . S _y WN 2 ,. w 0 222822N% b 2322 28222 222 224- 02NxT m z 0 0 `tlO $ m El' a " E m Hf s n C .- NJ- AAAVVOO O mN 11N12 H1111111iI1111 N D G m W Q +O{ `NVO atWNVV ANWAA 2022O V2NbVN=_pAAA NNAAA :-2n14-E1 n W N A a w N o 12411 O A A 2 N N ip N u O r2 Z r2 Z { m u t0 OOP •G 28T:',9 w <n 2 28,1'4240.+ t-,--5 r+�+�+� � A y A ut +N V O ao O A �D A N W N T O p T A T A n a (O Z+Z+N H D a m N O N O N m .1 Nio N m t 0 w N W W N N N N N 89.3- mil A W N 0 2 2 N A W O O�p A N W im" +� W AOA O W N W V aD V N A O O x N 84222 A 2,:1 2 2 T,='4222 W 8 8 2 T.-i5 Q ,,,,.. www.. N W NW W W w w O w 22222 N A p O 2222222g. Nat !.',822 OmVO2 28'222 A+oJ W 222 .0 MM +N .'"MM V M M V ..go s8 28282 82R,'82 42400 8882i", Ol 3 O y WJw WW 55:H5 51555 a 2JNN WW Mn, OA2 C JO N Y 3 2ANO220 wN82+ Nw22 OoooW24+ Atl +m 13',1"M m m m m. m m m N m m o+ b CoN AJ NN N MW0 m OCa 20 �424O2 WWNN+ 2‘7'428,1' WAVY w=4 0) ? -,',J J o o o N ill q w w w w 2 11111 w1w1 wwwNw 11111 wwww w rON oO 002AO2bO0 NN NANo02 1 . . . 44-44 W Opo Opo pW W ro W ro pW W Opo W Opo Opo pN pT Opo Opo W t Opo Opo K il yO Hill A Mil A(D A O_ A OF rif ,§).* I//7:s� THE STATE Alaska nit and Gas " �'�, ofALASI�:A Col servation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue OFALAS�P Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 John Egbejimba Engineering Team Leader BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Pool, PBU J-29 BP Exploration (Alaska), Inc. Permit No: 213-033 Surface Location: 800' FNL, 1951' FEL, SEC. 09, T11N, R13E, UM Bottomhole Location: 2457' FNL, 246' FWL, SEC. 04, T11N, R13E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P Foerster Chair DATED this day of March, 2013. a t k rro� a V ti.6.01 STATE OF ALASKA ' ALA; SIL AND GAS CONSERVATION COMM. DN MAR 0 5 2013 PERMIT TO DRILL n�^+�e 20 AAC 25.005 /�0GCC 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil ❑Service-Winj ®Single Zone 1 c.Specify if well is proposed for: ®Drill • ❑Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ❑Redrill ❑Reentry ❑Exploratory ❑Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5.Bond ®Blanket ❑Single Well 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193 PBU J-29 • 3. Address 6.Proposed Depth: 12.Field I Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12349' ' TVD 8661' ' Prudhoe Bay/Prudhoe Bay . 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028281 • 800' FNL, 1951' FEL, Sec. 09,T11N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13.Approximate Spud Date: 814'FSL, 174'FWL, Sec.04,T11N, R13E, UM June 15,2013 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 2457'FNL,246'FWL, Sec.04,T11N, R13E, UM 2560 17050' . 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 86.45' feet 15.Distance to Nearest Well Open Surface: x 642402• y-5970532 • Zone- ASP4 GL Elevation above MSL: . feet to Same Pool: 740' 16.Deviated Wells: Kickoff Depth: 300' - feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 118 degrees Downhole: 3173 Surface: 2339 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 20" 94# H-40 80' Surface Surface 80' 80' 260 sx Arctic Set(Approx.) 12-1/4" 9-5/8" 40# L-80 BTC 2675' Surface Surface 2675' 2671' 730 sx DeepCrete,408 sx Class'G' 8-3/4" 7" 26# L-80 VamTop 10034' Surface Surface 10034' 8611' 335 sx Class'G', 182 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr80 VamTop 2549' 9800' 8399' 12349' 8661' 510 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured): Casing Length Size Cement Volume MD ND Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 20.Attachments: 0 Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot ❑Shallow Hazard Analysis ®Diverter Sketch ❑Seabed Report ®Drilling Fluid Program 1E120 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Zach Sayers,564-5790 Printed Name Egbe'imb. Title Engineering Team Leader Email Zach.Sayers@bp.com • % %../Signatur / Phone 564 5859 Date �/y/�3 Commission Use Only Permit To Drill API Number: �y Permit/lip rewal Dlt; See cover letter for Number: -3 50-021_"2 5 �t other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas li /" contained shales: Other: 3z �7 fps L 7/p6--09 y S L Samples Req'd 0 Yes ®No Mud Log Req'd: Oyes 0 No I' HA Measures: ["Yes 0No Directional Survey Req'd: W Yes CI yo Spacing exception req'd: 0 Yes Ly No inclination-only svy Req'd: 0 Yes ❑'No FtO /-7 4._Cid/C r-a/ v,--off IC"v., ' loo qtr C APPROVED BY APPROVED BY / ^n nn , , SSIONER THE COMMISSION Date -3 Fnrm 1.-d11'Fi�P�i:-. 1 / . ►/A 'This permit is valid for 24 months from the date of aonroval(20 AAC 25.005(a11 Submit Form and Attachments In Duolicate bp To: Alaska Oil &Gas Conservation Commission From: Zach Sayers, ODE Date: March 1, 2013 Re: J-29 Permit to Drill The J-29 well is scheduled to be drilled by Parker 272 in June 2013. The grassroots well is a horizontal • producer targeting the Ivishak Zones 2, 3, and 4. The planned well has three hole sections. Surface casing will be set in competent shale in the lower SV4 to isolate the permafrost and running gravels. The intermediate hole is planned as a casing string which top sets the Sag River formation. The production , interval will be completed with a 4-W, 12.6#solid liner will be run and fully cemented, then perforated. The maximum anticipated surface pressure from the lvishak/Sag with a full column of gas from TD to surface is —2,372 psi (assumes 7.0 ppg as pore pressure). This well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 3,500 psi. In addition to a planned well summary, a directional plan and proposed completion diagram is attached to the permit application. If there are any questions concerning information on J-29, please do not hesitate to use the contact information below. Zach Sayers Office: 907-564-5790 Cell: 907-575-5189 Email: Zach.Sayersa,bp.com Attachments: Well Schematic Directional Plan BOPE Equipment Schematics J-29 PTD Page 1 3/1/2013 t , Planned Well Summary et Well J-29 • Well Oil Producer Object ve Ivishak Current Status Grass Roots Well - Estimated Start Date: 06/15/2013 Time to Complete: 35 Days Surface Northing Easting Offsets TRS Location 5,970,532 ' 642,402 800' FNL / 1,951' FEL - 11N 13E sec 9 • Northing Easting TVDss Offsets TRS Tgt 5,972,086 639,213 -8,524' 814' FSL / 174' FWL 11N 13E sec 4 TSAD BHL . 5,974,096 639,243 -8575' 2,457' FNL /246' FWL 11N 13E sec 4 Planned KOP: 300' MD/214' TVDss Planned TD: 12,349' MD / 8,575' TVDss Rig: Parker 272 . FBF-RT: 39.5 RTE (ref MSL): 86.45 Directional — Baker P7 KOP: 300' MD • Maximum Hole Angle: -48° in the 8-3/4" intermediate section -118° in the 6-1/8" production section Close Approach Wells: J-08, J-26 Survey Program: Surface to -700 ft MD = GYD-GC-SS (single shot gyro) -700 ft MD to TD = MWD+IFR+MS Nearest Property Line: 17,050 ft . Nearest Well within Pool: -740 ft J-29 PTD Page 2 3/1/2013 Formation Tops & Pore Pressure Estimate (SOR) Estimated Minimum Most Likely Maximum Depth Fluid Formation Formation Top Pore Pressure Pore Pressure Pore Pressure Uncertainty Type (Ai-) (TVDss) (EMW ppg) (EMW ppg) (EMW ppg) (+/-TVD ft) (for sands) G1 481 8.4 8.4 8.5 ±30 8'•(- SV6 1,780 8.4 8.4 8.5 ±30 BPRF 1,954 8.4 8.4 8.5 ±30 EOCU 2,328 8.4 C8.4 8.5 ±30 SV5 2,410 8.4 8.4 8.5 ±30 q " li SV4 2,605 8.4 8.4 8.5 ±30 q SV3 3,070 8.4 8.4 8.5 ±30 < SV2 3,220 8.4 8.4 8.5 ±30 SV1 3,603 8.4 9.0 9.6 ±30 UG4 3,980 8.4 9.0 9.6 ±40 UG4A 4,022 8.4 9.0 9.6 ±40 UG3 4,230 8.4 9.0 9.6 ±40 UG1 4,684 8.4 9.0 9.6 ±40 WS2 5,220 8.4 8.7 9.0 ±40 WS1 5,390 8.4 8.7 9.0 ±40 CM3 5,585 8.7 9.3 9.8 ±50 CM2 6,325 9.3 9.8 / 10.3 ±50 CM1 6,700 9.3 9.8 10.3 ±50 THRZ 6,835 9.5 9.8 10.0 ±50 /CP.p LCU 7,050 9.6 9.8 10.0 ±50 /d / TKNG 7,050 9.6 9.8 10.0 ±50 j TJH 9.6 9.8 10.0 ±50 TJG 7,245 9.6 9.8 10.0 ±50 TJF 7,605 9.6 9.8 10.0 ±50 TJE 7,760 9.6 9.8 10.0 ±50 TJD 7,970 9.6 9.9 10.1 ±50 TJC 8,220 9.6 9.9 10.2 ±50 TJB 8,350 9.6 10.1 10.5 ±50 TJA 8,440 9.6 10.1 I 10.5 ±50 /0'.5 TSGR 8,524 6.3 7.2 / 8.2 ±50 Gas g. r TSHU 8,561 6.3 7.1 9.9 ±50 > TSAD 8,638 6.3 7.1 8.1 ±50 Gas 45SB 8,653 6.3 7.0 8.1 ±50 Gas 42SB 8,728 6.3 7.0 8.1 ±50 Gas/Oil TCGL 8,800 6.3 7.0 8.1 ±50 Oil _ BCGL 8,871 6.3 7.0 8.1 ±50 Oil/Water 23SB 8,918 6.3 7.0 8.1 ±50 Oil/Water 22TS 8,984 6.3 7.0 8.1 ±50 Oil Water Inverted Section 21TS 8,975 22TS 8,922 ±50 23SB 8,862 ±50 BCGL 8,818 ±50 TCGL 8,742 ±50 42SB 8,675 ±50 45SB 8,597 ±50 TSAD 8,579 ±50 G�SSP? RR n / ►3 J-29 PTD Page 3 3/1/2013 3 i. Casing/Tubing Program Hole Casing/ Wt/Ft Grade Conn Length Top(ft) Bottom (ft) Size Tbg O.D. (ft) MD/TVDss MD/TVDss - 20" 94# H-40 - 80 Surface 80/16 12-1/4" 9-5/8" 40# L-80 BTC 2,675 2,675/2,585 Surface/-39.5 8-3/4" 7" 26# L-80 VamTop 10,034 Surface/-39.5 10,034/8,525 6-1/8" 4 %2" 12.6# 13Cr-80 VamTop 2,549 9,800/8,312 12,349/8,575 Tubing 4 %2" 12.6# 13Cr-80 VamTop 9,800 Surface 9,800/8,312 Mud Program Surface Hole Mud Properties: Drilplex Spud Mud 12-1/4" Hole Section Density PV YP API FL Chlorides Funnel Depth IntervalpH Viscosity ppg (cp) lb/100 ft2 m1/30min mg/I sec/qt 0'—Section TD • 8.6-9.4 30-50 40-80 10 <1000 10.8 60-120 Intermediate Mud Properties: LSND 8-3/4" hole section Depth Interval Density PV YP API FL HTHP FL MBT pH 1 (ppg) 2,675'—8,166' 9.8— 10.0 12 - 18 20 -28 <6 NC <18 9 - 10 8166' -TD 10.1-10.3 12-22 20-28 <4 <10 <20 9 - 10 Production Mud Properties: Water Based Polymer Fluid 6-1/8" hole section Low Shear ity PV YP Depth Interval Dens s (cp) (Ibl OOft2) API FL Rate MBT pH Viscosity 10,034' -TD 8.5-8.7 <12 10-20 >10 >15000 <4 8-9.5 Logging in Program g 12'/."Surface: Sample Catchers- not required for surface hole Drilling: , Dir/GR/Res Open Hole: None Cased Hole: None 8'/4" Intermediate: Sample Catchers—as required by Geology Drilling: Dir/GR/Res Open Hole: None Cased Hole: None 6-Ya" Production: Sample Catchers—as required by Geology Drilling: Dir/GR/Res/Neu/Den . Open Hole: None Cased Hole: None J-29 PTD Page 4 3/1/2013 Cement Program Casing Size 9-5/8"40#, L-80 Surface Casing Lead: Open hole volume+ 350%excess above BPRF, 40%excess below BPRF. Port collar Basis: used if hole conditions dictate Lead TOC: Surface Tail: Open hole volume+40% excess+ 80 ft shoe track Tail TOC: 1,000 ft MD above casing shoe Total Cement Lead 470.8 bbls, 2,644 cuft, 730 sks of 11.0 ppg DeepCRETE, Yield: 3.62 ft3/sk Volume: Tail 84.2 bbls, 473 cuft, 408 sks of 15.8 ppg Class G, Yield: 1.16 ft3/sk Casing Size 7" 26#, L-80 Intermediate Casing Basis: Lead: Open hole volume+ 30% excess Lead TOC: 1,000' MD below 9-%"casing shoe Tail: Open hole volume + 30%excess+ 80 ft shoe track Tail TOC: 1,000' MD above casing shoe Total Cement Lead 183.5 bbls, 1,031 cuft, 335 sks of 11.5 ppg Class G, Yield: 3.08 ft3/sk Volume: Tail 37.9 bbls, 213 cuft, 182 sks of 15.8 ppg Class G, Yield: 1.17 ft3/sk Casing Size 4.5" 12.6#, 13Cr-80 Production Liner Basis: Lead: Open hole volume+40%excess Lead TOC: TOL Total Cement Lead 106.4 bbls, 598 cuft, 510 sks of 15.8 ppg Class G, Yield: 1.17 ft3/sk Volume: Surface and Anti-Collision Issues Surface Shut-in Wells: The shut in and LOTO of R-13i is required prior to MIRU. J-08 will be required to be shut-in, and J-26 is already shut in for integrity reasons. Hydrogen Sulfide J-Pad is considered an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level J-25A 12 ppm 1/21/2012 #2 Closest SHL Well H2S Level J-16B 12 ppm 1/17/2012 #1 Closest BHL Well H2S Level J-28 18 ppm 1/10/2012 #2 Closest BHL Well H2S Level J-08 10 ppm 2/12/2012 Max. Recorded H2S on Pad/Facility J-28 100 ppm 5/1/2011 Faults Formation Where Encounter Fault MD Intersect TVDss Intersect Est.Throw Throw Direction Uncertainty Ivishak Zone 2A 10,900' 9012' 40-45'down to S 100ft Medium • J-29 PTD Page 5 3/1/2013 Drilling Waste Disposal • • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject , at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for • injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal/Contact the GPB Environmental Advisors (659-5893)for guidance. Well Control The 12-%4" surface hole will be drilled with a diverter. The 8-3/4" and the 6-W hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP test frequency for J-29 will be 14 days with function test every 7 days. Except in the event of a significant operational issue that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. 8-3/4" Intermediate Interval Maximum anticipated BHP 3,173 psi at @ TSGR at 8,524' TVDss (7.2 ppg EMW) - Maximum surface pressure 2,339 psi (.10 psi/ft gas gradient to surface) 25 bbls with a passing LOT at shoe Kick tolerance Assumes a 0.5 ppg kick intensity over the anticipated 7.59 ppg pore pressure at interval TD with a 10.1 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi Annular test to 3,500 psi/250 psi Integrity Test—8-3/4" hole LOT after drilling 20'-50' of new formation below previous shoe 7" Casing The upper VBRs will be changed to 7" rams to accommodate the 7" casing. 6-1/8" Production Interval Maximum anticipated BHP 3,270 psi @ Ivshak at 8,984 TVDss(7.0 ppg EMW) • Maximum surface pressure 2,372 psi (.10 psi/ft gas gradient to surface) ✓ Infinite with >9.0 ppg frac gradient Kick tolerance Assumes a 0.5 ppg kick intensity over the anticipated 7.2 ppg pore pressure in the Sag/Ivishak with an 8.5 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi Annular test to 3,500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20'-50' of new hole, target>10 ppg FIT 4-1/2" Liner Top Packer 3,500 psi surface pressure Test Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel Variance Request To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line (<1,000 ft). Procedures/Safeguards with paddle removed: • Fluid levels will be monitored in the pits for both gains and losses while drilling. Alarms will be set to indicate if gain or loss of more than 5 bbls has occurred. • The well will be monitored for flow when the pumps are off at each connection. • The planned 8.6-9.4 ppg fluid will provide over balance to formation fluid. J-29 PTD Page 6 3/1/2013 J-29 OPERATIONS SUMMARY Pre-Rig Work: 1. Set a 20" conductor. Weld an FMC landing ring for a Gen 5 well head 2. If necessary, level the pad and prepare location for rig move. 3. Remove well houses as necessary. 4. LOTO R-13i prior to MIRU of Parker 272. Rig Operations: 1. MIRU. NU diverter spool & riser and function test. PU 4" drill pipe as required and stand back in derrick. Take on 8.6 ppg DrilPlex Drilling fluid 2. RU Gyro. MU 12-%" drilling assembly with MWD/GR/Res. Spud and directionally drill surface hole to base of permafrost, perform short trip to surface. RIH drill to TD and perform short trip to base of permafrost. RIH to TD and CBU or until hole is clean, then POOH and lay down BHA. 3. Run and cement the 9-%", 40#, BTC, L-80 casing to surface, displacing cement with mud. Pressure test the 9-%"casing to 3,500 psi for 5 minutes. PU 4" drill pipe as needed. 4. ND diverter spool and NU and test casing/tubing head. NU BOPE (Configured from top to bottom: annular preventer, 2-7/8"x 5-1/2"VBR, blind/shear, mud cross, 2'/"x 5-1/2"VBR). Test rams @ 3,500 psi/250 psi, and annular to 3500 psi/250psi. 5. MU 83/"drilling BHA with MWD/GR/RES with well commander and RIH to float collar. Pressure test the 9-%" casing to 3,500 psi for 30 minutes. 6. Drill shoe track and displace well to 10.0 ppg LSND drilling fluid. Drill new formation to 20-50' below 9-%"shoe and perform LOT. -" 7. Drill ahead to+/-200' and above the CM1 Base, weight up mud to 10.2 ppg. Ensure mud is at weight before drilling into top of HRZ and Kingak. 8. Continue drilling to TD at the Top SAG. At TD, CBU, and condition hole as necessary to run 7" casing. 9. Change to 7"casing rams and test to 3,500 psi high and 250 psi low. 10. RU and run 7" 26# L-80 VAM TOP HC casing to TD and Cement in place as per well plan. Pressure test the 7" casing to 3,500 psi for 30 minutes. Change out upper rams to 2-7/8"x 5-1/2"VBR and test 11. PU 6-%e"drilling BHA assembly with MWD/GR/Resistivity/Density/Neutron with well commander and • RIH to the landing collar. Drill out shoe track to the top of the shoe. Displace the well to 8.6 ppg • reservoir drilling fluid. 12. Drill out shoe and 20'-50' of new formation and perform the planned FIT. Drill build and lateral hole section. MAD pass as necessary, RIH to TD, POOH on elevators. 13. Run and cement a 4-%" solid liner throughout the 6.125"wellbore and back into the 7"casing. 14. Set liner hanger and liner top packer and displace well to clean seawater above the liner top. POOH, LID the liner running tool. Pressure test casing and liner to 3,500 psi for 30 minutes. 15. RIH with DPC perf guns. Perf intervals +/- 150'to be determined from LWD logs. Plan to perforate overbalance. POOH, LD DP and perf guns. 16. R/U and run a 4-'/", 12.6#, 13CR, VAMTOP tubing completion with GLMS. Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. Make up tubing hanger per FMC Rep. Land the tubing hanger. 17. Reverse circulate filtered seawater and corrosion inhibitor into the tubing x casing annulus. Drop ball/rod and set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 18. Install TWC and test. Nipple down the BOPE. Nipple up the adapter flange and double master and test to 5,000 psi with diesel. Pull TWC with lubricator. 19. Freeze protect the well to-2,200' TVD and allow diesel to U-tube reaching equilibrium. 20. Install a BPV and test from below. 21. Secure the well. Rig down and Move Off. Post-Rig Work: 1. Pull BPV 2. MIRU slickline. Pull the ball and rod/RHC plug. Install generic GLM design 3. Blue Goo 9-%"x 20"annulus 4. Install well-house and instrumentation and flowline. J-29 PTD Page 7 3/1/2013 J-29 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: A. Surface Hole: No overpressure is expected in the surface hole and hydrates are not expected on J pad. B. Intermediate Hole: The SV1 and Ugnu are expected to be over pressured at 9.0 ppg. A minimum mud weight of 9.3 ppg will be utilized to provide adequate over balance. C. Production Hole: The pore pressure in the production interval is anticipated to be under pressured due to offset well production with limited injection support. The highest anticipated pore pressure is 7.20 ppg. Expected FIT provides an infinite kick tolerance. The interval will be drilled with a substantial over balance utilizing an 8.5 ppg fluid. II. Lost Circulation/Breathing A. Surface Hole: Lost circulation is considered a low probably and is rare on J-pad. B. Intermediate Hole: Lost circulation is considered a low risk with no mapped faults in the area. C. Production Hole: Breathing and/or lost circulation is a medium risk with the single anticipated fault crossing with —40-50 ft of throw. If lost circulation becomes a problem, follow the LCM decision tree provided in the drilling program. Utilize good hole cleaning practices to avoid high ECD and prevent pack-off potential which could induce breathing. Ill. Integrity Testing Test Point Test Depth Test type 9-%"Shoe 20'-50'from the 9-5/8"Shoe LOT 7"shoe 20'-50'from the 7"shoe FIT IV. A. As J-Pad is considered an H2S site, refer to the ADW "Hydrogen Sulfide" SOP for the appropriate operational guidelines. The max recorded H2S readings on the pad were 100 ppm in J-28 May 2011. J-25 recorded 12 ppm and J-16 recorded 112 ppm 1/17/2011 (closest wells at surface with H2S samples). V. Faults Formation Where Encounter Fault MD Intersect TVDss Intersect Est.Throw Throw Uncertainty Direction Ivishak Zone 2A 10,900' 9012' 40-45'down to S 100ft Medium VI. Anti-Collision Issues A. J-08 fails major risk with a 587 ft center to center distance B. J-26 fails major risk with a 151 ft center to center distance CONSULT THE J-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. J-29 PTD Page 8 3/1/2013 TREE= 4-16"F1vC Gen 5 J _2 9 WELLHEAD= 9-5/8"FMC ACTUATOR= PROPOSED KB.ELEV= BF.ELEV= KOP= Max Angle= 2200' H4-1/2"HES X NIP,ID=3.813" Datum MD= Datum TVD= 8800'SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 9-5/8"CSG,40#,L-80,ID=8.835" — 2675' 4 KBG-2 DMY BK 3 KBG-2 DMY BK-5 2 KBG-2 DMY BK-5 1 KBG-2 F-SLV BK-5 TOC-TBD' # I ' 9,300' H4-1/2"HES X NIP,ID=3.813" 4-1/2"TBG, 12.6#,13CR-85,VAMTOP —1 9,800' 9,400' —17"X 4-1/2"HES TNT 9CR PKR 9,500' H4-1/2"HES X NIP,ID=3.813" 9,530'-4-1/2"HES XN Nipple, ID=3.725" TOP OF 4-1/2"LNR 9,800' 9,800' H4-1/2"WLEG 4/4 7"CSG,26#,L-80,VAMTOP HC, ID=6.151" —I 10,034' 10,200'-4-1/2" Upper RA Tag 4 I 4/ 12,000'-4-1/2" Lower RA Tag 4-1/2"LNR,12.6#,L-80,ID=3.875" — 12,349' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/19/13 ZJS Update Proposed WELL: J-29 PROPOSED PERMIT No: API No: SEC 9,T11N,R13E,800'FNL&1841 'FEL BP Exploration(Alaska) r PARKER 272 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-5M 13 5/8"-5M STUDDED TOP 13 5/8"-5M FLANGED BOTTOM , 1 "„”-...- o ANNULAR BOP: W/(2) 14" UL2 OPERATOR, UPPER CAVITY SHAFFER LXT 13 5/8"-5M AND (2) 14" PSLK W/BSTR OPERATOR, " '• •'II u ..11...•...1..11...•...1' LOWER CAVITY 13-5/8" 5M STUDDED TOP 0 13-5/8" 5M FLANGED BOTTOM 0 ` 1 I ' DRILLING CROSS: I I 13 5/8"-5M FLANGED TOP I q I i - 13 5/8"-5M FLANGED BOTTOM �"»0 °°°°"O c. _ W (2) 3 1/8"-5M SIDE OUTLETS . °°°° • . r I ° e ,,°((yy I I C -� _ L..r o0 00 "fu_ Il i 1 •• U �•``•PYr ii 71 I I KILL LINE: �_�`1 1 �_I t7� 2-1/16" 5M FLEX HOSE I ��.� �! 1.— • �� 2-1/16" 5M X 3-1/8" 5M D.S.A. 1 �`I� �`I,� 3-1/8" 5M FLANGED MANUAL GATE VALVE 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE IF ...... °° .1 , Q, .,� 3) ■- oo I I CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 5M FLEX HOSE 13 5/8"- 5M FLANGED BOTTOM 3-1/8" w/(2) 14" UL2 OPERATOR a 0 a. CO L L W co (a aM r Wmom °' °' cz N N d ` 1� a i .. I- �� a L, MZ 111110 Z1: a CO "' am= a Z Z N az z 0 In cn . co pip 0 Nu". p co 4 N O O in b P7 o iiN CO 6°O pp V aZ 1 o o a° w CO m Naa c'ia J � 111 Y m — o ai _ N A E w (n> m 4.1 N 9 N N N _C 7 Cl - '', U .O r a 1 4 4 F- to 2 Z Z o 3 C p O) m O N J J 0 d > 7 O U ca 9 u r c' a Oco y t J J (7 1 .0 a w d C K m R y C y c c is u m E •O a V U9 2 d ° d Q il w w m 0 w e v� c (j ae w m U a E > ) rn O v m A a L d a Al 1 N " 0 L L v N :�, m J 1- r! Z N O N N O 7 7 7 Q 0 0 (h 0 0 0 CD CD N N OLCO d O v 1 Q) O y Ct m sa- co 0) U) Q c o. d c I I C CO m o. CL 0 • I" tai+ = 0 a y ; N CO = d o '95 51 ta c o) c R C c of m O N L C t C Z W u) t' H m Z W 3 o V a W le o 0o >- W 0 O + = o I- 0 0 a a >- I 0 Q d N CO N 6 co CI O d m m O. N O g 1. A _ 1 a E e rn ce N U) O Ci- 7 i) h y N L m U Z J J 3 Q_ a. N 5, O 0 O dii ° w 0 0 o 0 T a O O O 0 csi (0 n Z H N O O U) d W O N N N cq Q L o C Q a co O a - 7 Z (7 at 3 l6 Z y -' C C C N CO f0 N m f0 @ a aai N N a n a a o a E m v rn rn �° rn Y 2 v) 3 2 N 0 N N U) L t a it U) Q N + J. V ") c c c D Z Q z a a a a a in c .4" a C kill MI c co c u c u �� 131 a+O N C C d c Z C lei �W a $ a° a m o N a° ° a ° a c rn r 3 2 N g= E d m '" g o O aA es o a d =y H d 0 a .e C (,) a vi330 a 202 en u) u. 3 3 O. 3 c a' > > 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U a O O N N N N O O O 0 O O O O O O O ' m 0 0 ^ A e 0 h CO N N Ca n n c[ N N CL Y ..- O 0 0 0 0 0 0 0 0 0 0 CD O 0 0 0 0 Y a O O O O O O O O O O O O O O O O O O co c'5 U O O O O O ,-- .- ,- ,- ,- ,- O O O O O O 0 a a Z N Cat g/) Q m 7 LO LO O ag p6D O coce pa ' N i.:V V 2 -" N N 0 0 0 0 0 CO CO N V N N- O N V N 0) N n n Z Q 0 0 0 0 0 N .- 0 LC) N 0 CO n CD CO 0 N N k N N N N N N CO V V 0 0) V n O M co a s 0 ' 0 0 o O o 0 0 0 0 0 co V V V V v v c C C Y Of V V V V V V V V V V V CD () W c C N N N N N N N N N N N N N N N N N a ) d 3 a' Z' V V V V V V V V V V V V V V V V V j— a) a) a) � 2 N 3 CO CO CO 0 CO CD CO CO CO CO CO CD CO CO CO CO 0 N N c ❑ W =) r2w 0 0 0 0 0 M 0 CO O N n CO O O CO O 0 0 0 0 CO CO 0) V N _CO CO CO (0 CO 0 N N N N N N CD n 0 N N O 0) n N M N y CO CO CO CO M CO M CO CO V CO CO CD n CO 0) 0 o ,p' p) N U) CO CD CO Ln ID N Y') CD CD N N U) CD CO CD O O O O O O O O O o O O O O o O O L n n n n N- CD n N- n n n N- 0) n N- n n n n N Q1 Q7 0) O 0) 0) O m 0) 0) Cr) CO 0) CO CA 0) 0) 0 N 0 ._... U) 1.6 CD CO v) lA Cf) N N lD v) u) .- v) CO CO lD K Z 0) p C d Op) W III C U y L7 7 « O 0 O0 O 0 O 0) V 0) r•.- CO V N 0 CO CD V d C .4ccc c o O 0 O 0 M CO n V V V V CO CO M Gy o ,O .O O O O O O O O r N N n O M O W N N � � r wa mcn � m u01ti Z 9 Ti)4., E �^ J � g z° tno y222c 2 + + + -t C rn cc cc a O p LL LL LL 0. 'a p m N + + + O O O O O N OD n CO N 0) CO n CO CD V CO r 'y Q 0 0 0 0 0 0 0 0 CO N CO CO N- Cr CD CO O N V C0 O O O O O Ori CfI n M N N CO V CO CD Coo 0 a 'cI', w E CD m 3 3 a m 0 0 CO Ln O V 0 M N V 0 n 0) CO a CO 0CO 0 u) o u) v) LC) u) o v N 0) u) n C�) o m c,.) CO m + + + 0) 0 � M CO M M ,- CO N N N O N w Cn CO E LL LL LL m N CO v v O O nCO O 0 — - ,_ N Z OTT- 7- ta h a O O p F° 0 2 2 2 1 N N O O O W (D CO O O N- OD W O N V CO CO Q) V O O O W C) V lO CO CO 0) CD N CO V 0 CO 0 0 0 O ai ai n ai Qi Di 6 ao co n n n V CO o 0 0 0) 0) CO 0) 0) CD 0) 0) 0) CO 0) O s- N M M V in CD CO n co 0) O N M o E > F 3w 0 0 CD 0 o 0 0 0 0 0 0 0 0 0 C) 0 0 O O O O O O O O O O 0 O O O O 0 O O O O O O O O O O O O O O O O O O 0) p) p) m 'S N N N N N N N N N N N N N N N 0) N N N N 2J, -, E C C C C 'N u� y CD I 0 f0 a co 3 d a d a m 'N 0 T n n n n Q Q N 0) Xk * ik c 1 c c c c CO --CV . 0 O 0 0 CD CD CO 0 0 0 0 0 0 0 0 0 g a a a a 0 o 0 0 0 0 o co o 0 0 0 0 0 0 0 0 Q O o o O O O O O O N N CO V CD Cn 1f) ui O N LD N O O O O coco 0 O CO 0) 0) 0 N M V fi U T ECD 0 g 0 CD 0 M C CON o v rn COF- 1 Ci Q 8 d N N n r a -) C c c 40c o 2 m Vi Z a a d a 0 E m o 0 o D D 0 0 0 0 0 u) 0 0 0 0 0 0 O 0 0 CI) v o 0 0 'a o o v) o 0 0 0 0 0 0 0 0 4 W m � 0 � � N O` V O n M 0) ca C0 O O O '� O O I� 0 0 0 0 0 0 0 0 0 o m o d v co o 0 o m o o co o 0 0 0 0 0 0 0 0 LCI ,. a _ ,- N M V O CO O n CO 01 O N O S W; •• $ p - r'n o ' ',g o i c . H )i a _ to C7 x �/ m p c r d CO E d d y =y 'Th 2 W CV c.)) a. n330 C/) a • , • • O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O OU) 1 co 0 0 0 0 0 0 0 0 0 0 0 0 0 O O o o O o v a a O O O O o O O o O O O O O O o O O O O 'S OO aD m co co O N N N N N N N N N N N m O,_ c r r 0 , ^ u ^ O N O CO N N CO N N a Y O O O O O O O O O O O O O O O O O O O O Y O O O O O O O O O O O O O O O O O O O O O co @ o O O O O O 0 O O 0 0 O 0 U a a Z V) ¢ W 0 (0 co O 0 c O O sr st IX�0o1�(0` a .. V V 7 co 0 N V co 0) V O C) M M M M co M co M M M co C) ,O\, N- ^ Z Q o:, O N N O V 0 N- t` N- r r n n N- N- n V N N 7 OD r V (O n n a0 0] m6 a0 GD co m DD o0 6 m m a0 -) a a 0 ' N co M M co co co M M M M M M M M M M M M M Y V sr sr V R V V a sr 7 R V V a V V C V 7 C A• co N C N N N N N. N N N N N N• N N N N N N N N N ) E 'r W COC ((00 ((00 ((00 (0 ((00 ((0 CO scr C ((00 ((00 (0D ((00 CO ((00 COC ((00 (U0 ((00 ((0 CO0 cu N N ? .0 O 7 W => It 2 W V 00 O co co O co 47 O O O O O O O O O O O M N O n a0 Co M Co N N010101 N N N N N N N O au N C C7 O a0 W D) Q) W W W O) O) OI W W CO y N M M CO M M Co M M M M M M M CO M M M O .0 O O O 0 CO O (O (O (O O 0 0 O O (O O CD co O (O (C. C a .E - O O O O O• O O O O O O• O O O O O O O O O N- N- n N- n N- N- N- F- r- N- r` N- N- N- N- n N- N- n Le t a a a0 0 rn rn ) a) rn Co W Co Co 0) Co m 0) 0 CI) 0) W N O •0.• V7 C7 C) 6 N• C7 C7 C7 C) C) u7 U, In C7 N U, N (O (O CD t 2 m O C i jp d G) •O N� i 'O C (0) OC) 7 N O Q) CO Co N- CO N- co CO (O (O (D CO (0 (O (0 (O CO 0) ` C �.) M M W O .- (O V (O N- N- N- N- r N- n N- r` r` r` V O9 6 N O U N a) M O n f� Q) W a0 O a0 O O a0 O (O W O a0 OD ,p N co co M M M M M M M M M M co co M M M co M V r, K T a m J p. s Z (n O I W 0 U) N co N 00 N 00 (O O O O O O O O O O O O O Ce co O M r r N (D N C) C) u7 N u1 u7 ()] V7 V7 (n C) U) N- O M 0) N C) C) O O (O O O (D O CO CO (O (O O (O Cr) N- co 0) CO O O O O O O O O O O O O O O O O C .- <- .- .- .- ,- n. C co 1g 1 CO a 3 _ ET C) N- (D I.- O O v O v V' V <t O v O v O V 117 v a N co N M O N N O N 0101010 N O N O N O N R CO O m W 0) O 0) O) 0) O) a) O m 0) O D) C) 0) M 0) O O O co O O C) O O O O N O O O O u7 O b) V C) co n r W W 0) O .- N M M V ? (O (D (0 (O N W CO y .- .- ,- ,- ,- N N N N N N N N N N N N a O N N co CO 0) 47 0) CO T co N 0) C) co C) 0) O 03 r- M O CO V N- (O ? co (O (D co V' (O ? (O 7 (O C) (D . . (O (O 0) 0) (O C7 C7 O C7 C) 0) C7 ? 0) 0) C) C) N � CD W W O O) CO W 0) a 0 co N co W 0) 0) O) O M W 4 6 Or W ao W O 0 N co sr 7 Q C) O O N- N- 0 C re s- .- N N N N• N N N N N N N N N O O O O O O O O O O O O O O O O O O O O C) OO 0 O O O O O O 0000 O O O O O 0 V' . . O O N O N N N O O O N N N O N N N O O N N N N N N N N CVNNN N N N N N N N E N ° a_ =° m .N a (n O O O 0 CO O O C) O 0000 O O O O O O (O O O O O N O O C] O O O O O O O O O O O C) Q N N M N N O O O O O O O O O O O O O 3 ›, u N ° N N ,- o a » , C "6 -' C C C 0 O O 2 CO O N 0 Z a a 0 0 0- O O O O O 0 O (0 O 0 0 0 (D O (O O (O 0 O in 7 0 0 O.co O r O O N. O O O O N. O N O r 0 OD 9 0 N W r, o o 2 0 OO O O v O o 0 0 O 0 0 O N O r) '3 O LP m o 0 0 0 o I-- 0 o v O o 0 o a vO O o 03 o v m 0 all lei W� O co (DN 00 co rn 0 0 LL .- N co v = in (n m (0 N- N- o o r r .- cos- N N IC N N V N N N N 01 N N mN v . a 2 H N G2 ;u ; (/ ,M hi M2Cq a ° c c CV o d - - tdYa � b33o • O 0) N N V IN U) N CO n (0 Co N n CO O n (0 )0 co M Co O N n CO (t) N 7 O) CO n CD U) UD U) 'Q V V M M CO CO CO LZ O V N O O O O O O O O O O O O O O O m 0 w O o V O o O H O h 0 N CO N N a Y Y 0 N- N- n n n n n n n n n n n n n n n n N- N- n a o v v v c v v v V v V V v v v v v v v v v v Z co c'E U N N NN N N N N N NN NN NN NN N N NN N U 12_ d Z = Q y LD ii COU) 0 G o V V (0 (o D_ co co C) to p' V @ ..g. Y N (0 co co N CO CO M U) N U) O CO V V IN N CO N O O) O N n n Z Q Co N 0) (D 0) CO O 0) •- •- O O U) O N o V 0) V O N CD N N 7 n (O W O) O V O N M (D U) O M .- to .- n O n O C) - CL CL 0 ( co co N O CO CO (0 M O IN CO M CO V 0) (D Cr CO to Y V V V V V V CO CO COCICONN N .- •- O O O O CO CO (tea m m = x c e N N N N N N N N v v v v v N N N•Ct N N N.ch N v v F. ca a- 0) O N E U) •y S' CC (O (D CD (D (D O CD O CD CD CO CO CO CD (D CD f0 O CD CD CD ▪ N N 2 c 0 W -r al • U) O) O CD n 7 7 O V 7 N 0) M V Cl. O V U) 0) '.. N M N CD n CO 0) IN CD O 0) (0 V U) N N- co co O (A W O N M V Co CO N n V O N Co n (D O ,- (D n O p) co co V V V V Cr V UO UD CD n n IN CO CA O N V o .0 O) co co CO CO CD co co CO 00000 CO CD CO n N N- N- n n C o c o 0 0 0 0 0 0 0 0 0• 0 0 0 0 0 0 0 0 0 0 0 0 r r E N- N- N- n n n n n n n n n n n n N N- n N- N- n n `m t m 0) 0) 0) a s 0) 0 a a, CD0 CO01 CO 0) co a) o) 0) a, a, COC 2 0 .3. U) U) U) Ui U) U) U) Ui U) N• Ui Ui UD U) U) co- U) U) U) U) U) U) c 0 c_ 608 •- 0 N C V y 7 co V CO N V CO (D (D Co M U] n CD O CD M O M U) M co V co N o CO O O IN O (1) V 7 CO n ,- co .- N N O 00 0) CO 4 fD w R n co O O) U) M O O M V CA 66 O n n O Co O n C0 co M 0) •-' 0) (0 W N co (O U) O co co O N- 0 V y >'. (N6 i i N N co co co co sr V Ce L N (10,) > G t Z a(9 W 7 J F r2 Z W G 0 Q a) N CO U) U) OD .- O CO N CO Cr _ O CO CO n U) M CA CO N U) CO n n V n (O N .- co V co co co CO U) U) N CO N (D 0 n 0N O n • n (') N fA Of O) O U) N V DD CD O O O O N N M V V V U) (D co Co OO N O ,- ,- ,- ,- •- ,- N CL u) M c ' _ a V O M O (D O CO O N V O N- n M 0 O O N V ' CL O N O V O co V O (O CO CD O O Co n n CD O 0 N CO CO U) M W W O O n U) O N to M n M m m (O N O N O n U) CO U) O O O n O O N O O W co O n (O UI V co N N O co O( N- co C) O O ,- N N CO CO V U) CD CO n Co 0) 0) O o .- .- co co ca reN N N M M M M CO- CO- M CO CO M M CO' CO CO- CO- V V •V V a >a> 7 1 F CA CD U) co U) (D O U) co U) O CA co CD N N CO U) U) U) n CO V O V CO V n C) V N V V NNNO V V Co N N O U) U) V (D M (D CA U) O M CA U) U) CO 0) (D lD N M N co O) O) CD U) CA CA O OD CD CC) n Co CD UD V N CD O _ 0) N CO CO O) 0 N CO M V U) CO (O n Co O) O O N 1 >O N N N M M M COCOCO- COCO- CO- M M M M V V V V V V F 7CQ U) N M N OD •- V n O CD CD N •- CD O M V U) CD CO O V O V N V CD to CO _O N N M CO V V V V V V UD CO O N N N N N N N N N N N N N N L N- n CO CO CO Co CO CO Co O Oo C) C0 CO Co CO OD Co CO CO 00 CO N N N N N N N N NNNNN NNNNN N N N N E N o 0 co N a co o Co co N co O n V U) N 0) N- O V N CO IN n N V N Cn 0 M CO CO CO CO N CD n N CO •- CO CO 1- UD O .- V U) O V N V n to CO N N V N4 V n O N (•) V V n O) Q • N N N N N M CO co M co co l0 U N coV d m C f Q O N N N n • a 7 7 4k I- t t U , C cc 0 2 m 12 Lo o a • Z CL d d d 0_ N O O O CO O O O O O O O (D O o O O n 7 O O O Vi CO y 0 O O - O O O O O O O N O O O O CO CD O O O 1 N W TM J O O CJ N O O V O C] O O n O O O O V V O O O d V 0 O O O (D O O O O O O O O O O V co O O O ` to O) O - - N CO M V (D CD n n Co CO O c- .- a- Q N M V co LP N ' N 0) M COH COM M N CO- M• COCOCO- COCOV V V V V a V V V oi W C .. 3 U) U)iU)) CO 7 7 0-) Immo •• o ao rn c O d_ _ _ 0 • c N d N 0 0. 0 0 a • • O 0) CO N. CO N N 0 0 0) m N. CO U C CO N N 0 0) CO CO CONNN c- •- •- s- O O O O O O O O O O O 0) 13 a O O O O O C C C C C C C C C C C C C C C C C M j - N. r• N- N- r- C- N N- r N N- N N N- r` N- N- n m 0 CI1 ° — o A o o CO N N CO N N a r` N- N- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 g Y Y a C v v v v co l0 0_ NN N N N O 0 0 O 0 0 0 C1 0 0 0 0 0 0 0 0 0 0 O 0 CL a z E V5a d2 0U) O c o .4- .4- ooa coaa 03 V Y W N CO N- CO CO CO C CO 0 M m CO M C m Cr CO N CO M N N NZ Q 0 m CO C m CO N CO N v) CO m N C0 m C) M CO CO O N Nr." 7 CO N CO CO m M 0 CC CO CO r O) N N CD 0 N 0) N. a a 0 C m N m m C N 0 N <C CO N C) O Cm) N m cr CO ti CO CO Y CO CO N- N- CO co. N N C C M N O• N N a a s c C c v - v v - v - v v - v v ' - - v v v v - v v = CO m c) E 2 N 3 CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CD C.4CI N 2 0 W y 1- 2 W m m CO CO CO L M N- N CO 0 M CO m CD 0) o <C 0 C O N CO N N CO O CO N 0 M •- CO m CO O r- U C N C) co m C N- aD CO CO 0 M 6 O u) 0) C 0 C m CA C) m CO N d Cco CO m CO 0 •- N CV CO r- m CO .- N C N CO N- CO CO 0 O .ei °) r— N N N- N h CO CO CO CO CO CO CO CO CO 0) 0) 0) O) 0) 0) 0) O C 0C 0 O O O O O O O O O O O O O 0 O O O O O O O V. L t F N- r` N- r` (` ` r rr` N- r` r N N N- n r r` n r` n N- r` N- a w Nt 7 0) O) 0) 0) 0) 0) 0) 0) 0) m 0) 0) 0) 0) 0) CO CO 0) 0) 0) 0) CO m ▪ 2 Z ... N N N 16 u) CD N CD N N (0 <C N CO ..6 N <C N N N N N N C B y O ._ C N O Ca p O U y 7 N N- O N CO r CO N- C CO 0 M N C N CO N M C CO 0 m CO C ° CO O m N- N m CO m CO CO CO CO CO O CO h 0 CO O O m CO 9 a a 0a v N m m0 0 C) 6 r` CO CO CO U) CO mai 0 C N C) 0 M O w U w C 0 N- I0 N 0) CO n CO m CO N CO CO C C s- CO N l0 ✓ y a T 0) CA m CO r- N OD CO O) 01 O _ N CO CO CLO )0 m m N- N- u o re o C Z r«4 111 J 2 2 w D Ill 0 r O co_ CO CO m CO CO .- C m CO a) 0) CO m C N CO C CC M CO N 1- t` m O M O) C 1!] m n co CO O O N N m CO CO N r N m m N f� m CI Oi N n Ci O m r N m CO C 0) N M C 0 CO N- 0) N N C 0 n C) 0 N C N N N- CO CO O C N NNNN N N CO M CO M M CO M C C C C C C Cr C 0 0. c rn10 0 11 , 5 1 O 0 CO 0) 0 co M C 0 CO C0 C N- N 0 C 0 0 0 .- a 0 m C0 M 0) co m CO O N CO m CO N CO N O N M 0 O CO O C C M m u) C) C 0 m N Ms- 01 N- CO 0 C Md N m co CO M 0 M N- M O N- CO C O N- C •O O C N N CO O COO N CD) N N M ch V C v) m m CO N CO CO COCD U) N C C C C C C C C C C C C C C N <C <C co- C0 C0 m u) co- a 7 N co N .- C CO 0 m 0) l0 M 0 0) N r` CO CO 0) N CO m 0 CO C O 0) CO C O N 0 C 0 m N O CO m C N- Cr .4- co m m O C1 CJ cc; L0 N 0) O r� C N O CD CO C N co CO CO a0 • C N 0) N C0 N CO 0 N- N 0) CO CO CO CO co 0 0 N- M N- 0 CO CO V C N CO m CO N m CO 0) O O .- N M CO CO a C 0 ' O E C C C Cr- Cr- C C C C C C C C CO 6- CO CO CO u) N CO CO CO N N C CO CO h 0) O .- N M v CO N- m 0 CO CO C CO CO N- u) u) LO v) v) v) u) m m m CO m m m CD N n r` N r` N- r` N. N N N N N N N N N N N N N N N N N N N N N N N • CO m CO CO CO m CO m CO CO CO CO CO m CO m CO CO CO CO CO CO CO N NNNN N NNNN N NNNNN NNN N N N N E a R .. m •N Q 1 Cn N n C N 0 C C C C CO Cr C v C C C C C C C C CO C 0) 0) V 0) O 0) co n CO m N C CO N N- 0 CO CO CO CO I!] U] Q O C CO m h h r` r` N N n 1- n r- r co CO CO co co co CO C C C C C M C C C C C C C C C C C C C C C C C C CO• T C7 ... C 01 CO C rs O Q O 3 N N r 0 -t 0 -3 C C C O O ` m N O N Z a a a a a M O 0 O — O O O O 0 O O O 0 0 0 0 0 CD 0 0 v O y m O 0 O m CO 0 O O O ,- O O O O O O O O C O O C0 N W a N 0 0 0 ri _i0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 m 0 Z O 0 3 0 ,- ` �Z CO m N N COm CO O `- N CO C N m r- CO 0) CO O 3 N OD v v si v 't v v ri 6 6 <C uv) ui ..6 Cn C vi uCO co- CO CON Vti`,WwG 71. 2v w - W Mc .. Ma rts cu o szEO d . . in m c.) a` a) o a csi O 00 N- N- CD N 7 C) NO 0) 00 N- CO CD C, co CO 0 C) 0 N- 0) 0 0) C) 0) 0) 0 0) 0) O) a) CO CO CD O CO CO 0 C) N 0 CO 0 U a M M CI C) M C) C) M C) C) C) M M C) C) C) M C) 7 N 0 7 7 j N- N- N. N- N- C N N- N- N- N- N- N- N- N- n N- r 7 7 CO CO C) 1 u . p 0 w m ^ o ` o 0) N N CO N N a Y Y _ O O O O O o o O O O O O O o O O O O 0 0 0 0 0 d r r r r r r r r r r r r r O 0 CO CO 0 `m `m U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 6 v v v v v 0 CL a z . . Q m LO n O C o ( 0 O o 77, a — co co d d 3 N O O a) CON- 7 CO 7 CO CO N N C7 (0 0 00 CO (O 7 N- .- CO N N N- Z Q O .- N CO (D .- t` 7 N N CO N CO O CO O 1O N CO N- O) M. N N 3 CD n .- (0 N 6 7 V 7 7 7 7 7 N- (O 6 (O CO O (O 0i CO CL d 0 ' (D 0 N- N N 00 7 N O CO (D 0 N N V) CO lO in 0) 0) N Y (O 7 7 7 CO N N .- O O O) CO N- N- N- CO N N (O CO C) C) f0 CO CO = coEt O O co- O O O co- O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 Y. ti Ti 0) 0) 0 ,E N CO7CO7CO CO CO CO 7 sr 7 7D CO7CO CO CD CD CD CO cO CD CDMCOCol CO CD CO UCNN 2 C O W ` j) j) H W O CD CO CO 7 N. CO N- N (O CO o LO N C) C) N 7 7 N- .- CO N N CO C) CO CO 0) CD N a) 1O4 CO 0 7 0 (O O 0 1O 0 N a) . N.: N co CO N O O 7 04 C) 0) 0 N6 f� CO O 0 CoO co co 7 CO 0 0 0 O N C) 7 CO NN-- 0 0) O N N C) 10 N- CO 0 U .0 O O O O O O O r- N N N N N N N CO C o C r — r 0 t LC r- n r N- r N- N- n n n n n n r N- n N- n n r- N- N` 2 CO C) 01 0) CO 0) 0 CO 0) 0) 0 0) 0) 0) 0) CO 0) 0) 0) 0 0) 0) a) 2 Et Z - N N 117 IO (O C7 UO N• 1O N 1D (O IO N N (O N N N N N (O lO L Co O R C ti U N %a V y 7 0 O .- LO o CO .- 7 7 N N- N N N- N N N- N- o N- M 7 ` C V N N 0 f� O C) 7 7 CI O N� N O CO O O N 0 r (O CO CO Q Co w N 7 6 6 u) (D (0 (0 CO CO CO (O N 7 N C) C) N N 0) N n O 1O j o N w Co C..) N N 0) N CD C) O N� 7 00 (O N 0 CO CO C) O CO CO CO CO 0 C) V U) CO CO 0) 0 .- .- N CO CO 7 (O (O CD CO N- 0 CO CO 0 0 0 0 C .. L y ,p N N N N N N N N N N N N N N N N N N P c10i 00 - r Z « (fin 1 1 o 2 z N O W ` J o O. N 0 CI CI C) CO N O N- CO CO N U, CD CO O N O 0) CO CO CO C) C) N 7 7 7 7 7 7 CO CO N N N-. ,- O o 0 lO co co 7 N- O (O N N CO 7 O co N a0 7 O CDN 6 7 O O O C) 6O 0) N co 7 1O CD CO 0 .- CO 7 CD CO 0) N 7 1O CO CO 0 O C) c N co N N co (a co co co co co co CD N- N- N- N- N- N- N- CO CO CO 0. C rnr~ l m m z n. ) 5 CO CO O N 1O 0) N- N- 0) 7 ,-- sr 0 CO CO (O N N N 0 1D a CO CO O 0 .- 7 0 0 N .- ' N 7 0 N- N O CO CO 0 CO 0 ,- N- 0 0 1D m CD N (0 CO co CO CO CO CO M (O n N- a0 0 1O 7 O 0 CO 0 co Co N 0 CO C1 0 N. 7 CO (O N N 0) CD 0) C) 0 O n 0) 7 Ln N CD (D n CO 0 0 O ' .- N C) C) CO 7 7 Ln CO CD r n com 6 u7 1O (O (O N U, u1 1O CD 0 CD (D CO co (O (D co- (D UD (D co- (D a 0 m N N- O 7 N N 7 0 CO (O 0 (O C) O N- N- (0 N- 1O 0 C1 N 7 CO CD 0 V 0 N- N 1O CO CO .7 N N- C) N h 7 N 7 CO N CO .- N 7 CI co C) N N N N N .- C) 6 7 6 N .- .- CO 7 N- 7 N- CO N N 0) CO C) 0 N- 7 CO N CO N 0 CO CO CO (O 0 O N- CO 0 0 O N N co 7 7 7 C? (O CD N N N CO G 16 N (O u) N N (O N CO (O (O (O (O CO (O (O (O CO CD CD (O CO CO W m O O CO 7 CD N- 0) O N CO 1O CO CO CO 0 0 7 N N CO N- W CO CO CO CO CO CO CO 0 CO 0 0 0) 0) 0) 0 0 7 N 0 C) CO . N N N N N N N N N N N N N N N N N C) N O CO N Z co co N N N co co CD co co CO N co CD CO N N CO N CO 0) 0 0 N N N N N N N N N N N N N N N N N N N N N N (•') E N 0 ` co •N Q u) 7 7 7 7 7 7 7 7 7 7 7 7 (O 7 7 7 O N CO 7 N CO Q 7 CO C) N .- 0 0 CO N- CO 1O 7 C) N N O O N- CO N O Q 7• 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 („) 7 C) co C) C) co C) U a V ▪ (6 C C 0 CO N 19N N ^ o Q L d-3 -i It: I- 13 13 ", C C C a) O 2 m l6 l0 l0 O) Z IL d IL a s O O N O O O O 0 O 0 O O 0 N- O O 0 7 O O O CO CD Vii 0 0 7 0 0 0 0 O 0 0 0 O O 7 o 0 0 CO Cn 0 0 0 C) O I N WCo O o M(D O O O O 6 6 O O 6 O O O n O O O O O O O O O O 0 O O O C) J O O O CO 0 0 0 7 0 0 o O co O o q C) 7 7 N CO N- CO 0) 0 .- N C) 7 7 (O CO N- N- CO 0) 0 O NOet am p co- co- (0 co- (D co- co- co- f` f` r f` R. n n n r r-- 1.--- ao co- ‘-co- 6 VIc U U m V (.61111u0 .. o d am ae o o am aN c> ain33o if (O M M CD 0 00 n 0 .- O 0 0 0 0 0 0 0 0 0 0 0 CO N- CO CO V n CO 0) 0 (D O 0 0 0 0 0 0 O 0 0 0 0 a 0- Ca M M N N N 0) O O O O O O O O Ci O O O Q ,- : : : : O Q1 O n0 I a, u r. OFo co D) Q) W D1 W a) 0) a) 0) O O O O O O O O O O O O coO O O O O O O O O O Y Y d 0) 0) O) a, O U v 4v V V v V V V O O O o O O O O O O O O a a z °i o to 1n 00 G o V st(0 co m a V© O N N C0 a) V V n co o o co CO CO co CO N CO V) N- n n 0) N N n N- Z Q 0) a) U) a O M co co CO O N V n CD OO 0 CO N N N O N T CD - a) V N V V M N N O 0) 0) CO m n n O. n. 0 ' N O n U) V M N N N N N N N N N Y co M M N N N N N N N N N N N N N N N N NCV N N f0 l0 C �+ M M Co) M M M co co M CO M co M CO M M M C') M M co 1' cc0) 0) a) E N 11 co co CO CD CD CO CD CO CO CD cD m m CD CD m m CD CD CD CD NN 2 o W V -i -, H 2 W V co co U) CO V n CD W M CO CO CO V V 0 W V a) 0 V O co n O V n n U) n 0 N U) U) CO n o N n N V V co N U) O O a) U) N V n W n 0) C) CO O n O a) N M CD 0 0 V 0 co 0) N CD 0 V U) 0) N M nN (O (,) .0 !A co M M V V U) U) (O O O O n n CO W OO C O C r 1 L t cg n n n r� n n n n n n n r� n n wt 2 Ci) CD 0) 0) O 0) 0) 01 Of m 0) 01 0) Q) a) CD CD0) a) a) 0) y 2 0 co- U) U) U) U) U) N N U) co- U) U) U) U) U) U) N U) U) U) U) ZC Z O) O CC ai 2 1 a u to OU U N ., COO nN N M ICO O (D n 4) V CO 4) al r W O) 0I 41 o - r r N- r- O 0) - r CO a) a) 01 r r r r 0) .- 9 co w CU r) (o a) v tri o co GO D) D) ai ai ai ai ai ai ai o) ai ai D) O N IT, 0 N O n0 0 CO M U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) 0 D: N L >, D f�) C�) M M M M r) Cil C') C') rt) C) . C') M M C I M CO C) ‘7,7i U 0 p= S N 10 >> O W J F 2 Z (n O O 1 a) O N CD M 00 N- n CD N CO V 0 0 N- N- CO W 0 U) Ce V m O W O o 0) O n O N U) OO co 0 O M U) 0 co O O V O N ,- CD n n O r) U) n U) m (O N V CO CO CO O1 U) CD 0) N M CD 0 N U) W CO n [O U) CO O V in 00 C CO CO CO 01 01 O O O O 00 N N N M M M co CO co Z a- 5 0 U) 0) CO 0 co 0 co V n 0 0 CO 0 CD W N 0 U) Cl- CD CO n n O CD n o V V OCDCOO 0) 0 U) — CO O V ,x U) V N (V Ori V U) V U) Co Co n U) n Ci ao 0) O) OO CO M co co V co M N V CD 0 m CO 0 N- O CO U) V N- V S Ca O 0) O 0 s- N N N M V V U) (D CD n n CO 0) W O r 1 O N CO CDCD n n n n n n n n n n n n Nn n n n W CL v U) 0 V M U) 0 1D U) M to 0) N U) U) CO U) V N- U) O V CO N N V V W CO V n V M V 0 CD N V a) O a) a) CO O .- o N M M ,- V o U) U) CO CO (O (NI U) M N M N M U) 0 0) CO n D) CO V U) V M U) N W W O N CO M CO V V U) CD CD N- O CO 0) 0 O o s- ...... o CONN- N- n n n n n n n n n n n n n co a co N 7 U) co M CO n 0 O O O o 0 o O co o O O O O 0 N- O 0) CO CO U) 0 O 0 0 0 O O o o 0 0 O O N.: O O N V n o O O O O o O O O O O O O L O N M M V U) U) CD O CD CD CD CD CD CD CD CO CO CO CD 0 CO M M M M co co co co co M M CO M M M M M CO M co N •N "" 0. = m 'N Q 1 CO U) VN N W CO O O O O o O O o O o O O O of O N- O M CO n 0 O O O O O O O O O O O O m 0 Co vi vi v v c EDEn U) En En EnU) U) En vi En LOCC) Q N N N N N N N N N N N N N N N N N N N N N co U >-. , V �. N CO C �.. Q L d N N n L '' 4t L MI -+ C C C O 2 m 0 CO 10 110 Z d Cl Cl Cl d Ca 0 O O n 0 0 0 M 0 0 0 0 M 0 CD 0 0 o CD O N O O O 0) Z O O M co O co O O U) O co O O O N O N W (o O O O n O O N M O O O O a) O O O O O N O U) N (O O O O O f' O O N V O O O O 0 O) 0 0 0 N O all ` .- of N CO V V . U) CO CD co n CO a) o O �- N CO V V U) azi �� co 0 e^, Co d' co- co co- co' 7 co Co co 0 co- 'o m co m o0) a, LL ai ai W co- ai GC D) O a) („) ®,�� C .. O 7 F J H 7. S f- f' F Cry Ileum N j� O 0 0) I ^O a m .. a E C F 41 DoyvCDd cN _ m C.) a. 3 0 a ,- O 0 0 0 0 0 0 0 O 0 0 0 0 N CD ,- 0) (0 O 0 0 O 0 0 0 0 0 0 0 0 0 CO 0 CO CO a a O o o 0 0 0 o O O O d O 6 v v v C (h 3 .0 j co 0 a) u o 10 0 0 (// N N u) N Na _ 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O N ) 0 0 0 0 0 0 0 0 O O O 0 C C C C C C a 60 0 0 0 0 0 0 0 0 0 o n n N- N- N- N U U U d d Z x x Q y 2 0 (n (n 0 0 c C C m (0 Q pm`pm©` w m 1 © 7 N N- CO m m M m CO m m m CO (0 N a N N- ^ 2Q C ,- m CO CO U) O r N 01 (0 U) C N N N (0 0) N N N (0 (0 Ui u) 4 V V C) of N N N N N N N N N -, 0 0_ 0 Y N N N N N N N N N N N N N N N N N N N N N E N C D7 Of m Q) Q7 D) Q7 D7 D7 0 O W O m 61 W T 01 a-' M M M CO CO M M M CO M M M M M M CO M M 4• 0) 0) U) h 7 u) (0 m (0 m CO (0 CO (0 CO CO m m m u) CD m CO • N N = C a W ... 12 w 0) O C C 0) u) C 0 O CO N. u) M m 0) 0) N- M N 0 N m u) m N- 0) N C 0 0 () 0) N N C U) N- C 01 u) U) M6 C M N6 C M a) O N C C m O N .Cr n CO 0 0 ,- C U) m 0 N O .7 0) 0) 0) m 0) O O 0 0 0 0 ._ 1- .- N N 0 L n N N N N N N N N N N N N N r` N. N- N- N- n n IN N. N N. N- N. N- n N- N N 0) al. 0) 0) 0) 0) a) a) O 0) 0) O 0) m a) 0) m 0) c, 2 Z --• U) U) UI U) U) U) ui U) UI 6u) u) U) u) u) ..6 U) U) 0 m 0 c• aiu W O V d 7 0) O 0) 0) 0) 0) O 0) 0) CO 0) 0) m (00 t` v M coC y 2 v CD Q ` ,.d, m 0) 0) 0) 0) 0) of 0) of of of of 0) 0) (0 m co r m p (� N U) U) U) V1 V1 u) u) u) UI N U) u) U) U) u) U) U) U) tR R C .0• CC 0 .0 o) el co- r) r) r) r) o) ri CI CO) r) r) of C ri r) J a Z U) 0 w 0 t 0 UM m N. C 0 0 m (0 CO 0) U) N 0 (0 N- h C Ce _ m u) co m N O r .-- M U1 m u) C co N • 0) N M CO h u7 O C m N O ▪ CO N 0) CO C N. N- M u) N.- O N7 M C N.- m 0) CO CO C C a C C U) u) u) U1 CO (O (0 C) (0 (0 m CO r N. co m Z g a l 5 mco 0) O v O m O O 0) 0) O 0 CO 0 0) a O . 0 N. M 0 0) 0 (D 0 0 N c- 0 0 O 0 a) CO r O N O N o M V N C m M m O M N- N N u7 O C O N m n m M u1 • N (0 0) N N CO M Cr v C U) u) U) u) CO CO (6 n n @ CI) CO ao m m m CO- CO- m6 U) m 6 m m m m m 6- 4 O 7 M C u) (0 0) U) CO U) m N u) C C in U) m Lc) C U) N C r C C C 0 C V n U) a C C V N N- N- (0 ND (0 (0 0) (0 6 O N- o O C d N. C N- • u) O O 0) M CO N CO C u) N- N M U) CO NN COCOCOC C U) U) m CO CO m r n r COCO CO- _ _ CO- CO- _ CO- _ _ _ CO- CO- CO- _ 0 m m CO CO m m m m m 03- m 2 O 0 0 0 0 0 0 0 0 0 0 0 0) C N N CO CO O 0 0 0 0 0 0 0 0 0 0 O 0) M CO. 0 O O d O O O O O O O O O O O ,- , N L (0 m CO m m (0 m (0 m m CO CO ., M CO CO M M M CO CO CO CO CO M E N ° 0 m .N a (n 0 O O O O O O O O O O O N.. CO ()) In v O O O O O O O O O O 0 0 0) C N� M (n N.vi 666 6 U) 6 66 6U) 6U) o (+i (0 0 Q N N N N N N N N N N N N N CO CO M M C co 0 N 0 O 0 m C ''... u) E N N N 0 Q L d » 4t F ✓ V ) C C C 0 O 2 m m a, m a . z d 0_ d d d 0 .- .- 0 O (n o U) 0 C (0 N. 0 6) .- 0 0 0 Si O CO 0 O U) 0 CO 0 U) CO CO y 0 0• m 0 0 N T O M m o O O O d M C (0 J o m O O O U) ,,. y CD C 0) 0 O v 0 C O CO N- m 0 0 co N. O N 0 2 m m CO f` CO CO 0) CO 0 0 IX 0 0 0 .- .- 0 m N N m M 7 —W1 p • rn CD '0 Di V 6) of of m of ai Q o o co 0 2 0 f. o o < o 0 o o y o M O. 2 o_ .) O co N CO N m c� a` in33o 0 V N Co M N. V Co N 0 N M 0 0 0 N V 0 ' CO N 0) CO Co N 7 M N N x- x- 0 0 CO 0 0 0 0) CO CO 0 a C. M N N N N N N N N N N M M M 0 0 0 O O O ID I Y ,- ,- N N --S ai t N '-'0 0 0) N N a 0 0 0 O O 0 0 0 O 0 0 0 0 0 0 0 0 0 0 O 0 LU O) V C V V V 7 V N N U) O O O O O O O CO0 -co m U r- n N- N r; N. N- n n N- N- CO CO co 0 0 0 CO co Co 0_a Z E QN y 7 U, vii m J O co co 2 CO �o\ (Cla V 3 V CO 0) N V LO N Co CO N N 0) N- 0 Cl) CO Co x- 0 U7 Co V M 0) CO N N U) O 7 M co CO M Q Co N m a 0) m 0 Co NN rZ Q N NN- 7 M V Co CO CO O V Co W W Co N C Co -, a a 0N N N N N CO CO CO M CO CO N 0 0 C C C Y N N N N N N N N N N N N N N N N N NNNN 7 g. 3 W C E cm') co M M M M M M CO CO CM ') CO M CO M CO CO M CO CO M = a) 0) , y I cocococoE Co Co co co Co Co Co Co Co Co CO co Co m m m ry N N 2 C 0 W > > H W ✓ N co CO .- N.- N M CO N- 0) N. 0) CO N- N Co 0 N- O N U) 0 CO _ LO N CO O) (O CO V' O) M N N N CO 0 M a N Co Co 0) h 6 V 0 M M 0) N 0 Co O) r- N V N N 0) l0 N- N U) V N- C R R V Co C C M M CO CO N u .O C) N N CO CO U V 6 U) CO N- CO CO CO 0) 0 ,- N N co V N O o C N N N N N N N N N N N N N N M M M M M M M L L N- N. N- r` N- I,- N- N N. r N- N- n N- r` r I,- n N- n N- .92 v N 0) 0) 0) 0) 0) 0) 0) 0) CO 0) 0) 0) 0) CO O) 0) 0) 0) 0) 0) 0) - y r2 O U) V7 N rfI 1n N N Co Kc Z U) O CO d `+ C Cl) u LC U O C 7 0 Cl N- 0 Co 0 r� M N. 0 O CO CO N. M N N '- C u d U CON N CON- 0) N U) N 0) ? V m m N N- CO N O) O C r Q d w CO M 0 O) CO 'Cl. 0I N U) 0 r- CO Co N r� M M Co 'Cl O w m U N )O U) U) R V C CO M M N N N N CO CO M M M • d L >, co P7 M L`7 [h M co- c7 tom) M M M ("•?- C' p >>> g O 7 2,s W J F � y O 0 a) N- V 0) O CO CT 0) CO N U) Co VI N x- x- I- U) ? M Ce M O N N N N. U) r m m M O N N- U) 0 n- m N N O Co C- U, M N CO N. 0 O) V N- r0 M 0) 0) N CO 0 U) CO N- 0_ r N. M N- N- N- Co CO CO Co Co N O N. m CO 0) 0) m O N CO M LO U) CO n n CO O) O CL c fn - ,- - N N N N N N N N N N N N N N co- Ca m N �° a 5 O U) 0 0 co co O r N LO CO N U) N co co O co y CL O - O CO 0 0 N O N N O LO m LO m M CO m N U) 0 m CI N M Co U) C C N r- 0 0) N Co Co M 0) Co Co 0) 0 0 N N- Co x- CO I,- CO 0 N .- ,- O CO CO CO Co V x- CO m m CO CO CO O) 0) 0) 0) 0 0 0 0 0 0 CO 0) 0) 0) 0) CO CO m NC coLD LD m m m m m 0) m 0) 0) 0) 0) LD m 117 LD m ao mQI O N LO O LO Co LO CO U) N N- 0 CO N- 0 N- CO CO CO U) 0) ✓ co V co V U) 7 V N- LO LO 0 0 0 0 N- N N N. 0) Co CO n 0 O Co M Co CO 0) M U) 0 U) LO U) U) Co co O co N- O N CO N Co 0 0 0 0) CO Co h U] LO CO 0 CO Co 0) 0) CO 0 0 0 0 O 0 0 0 0 0 0 0 O 0) O r m m m m O) m 0) 0) 0) O) 0) 0) m O) 0) 0) m 0) O) m m 7 N- C O) CO CO U] CO N- r LO CO Co x- C) 0 0 0 Co r CO Co ✓ m CO O M a n m O CO U) O m U) LO N LO U) m CO N ✓ N N CO CO M CO M V V M Co Co Co Co CO Co Co 0 M E U) N U) U) C] U) U) }3 M M M M CO M C') E N a = m N a y co M N. N Co U] 0 O Co N- N- N. N- V CO 0) CO CoN. N N 0) M O m co U) N U) L!') N- CO 0) U) U] Co M U) 0 N 0 N n UI O N m Co Co Co Co a 0) 6 QV 'Q U) N COm Co0 N- N. N- COm CO0) O 0) 0) 0) 0) 0) CO0) 0) 0 0 (0 0 U N U r.: a) C m — U) N E N N N 0 0 L L a # I_ F 't -0 C C C O O O 2 m l0 l0 O Ln O .,: Z CL a CL d d N. 0 Co 0 LO 0 0 M O 0 4D 0 O O LO 0 0 0 O Ln o CO 0 0 0 0 0 o w y 0 o CO 0 0 COy 0 0 0 0 N W >. r. O N- 0 R 0 0 0) 0 O co J O 0 Co 0 0 Co J 0 0 0 0 6 Cl) co 0 I,- 0 CO 0 0 N 0 0 Co 0 0 0 0 0 0) 0 0 0 0 0 ` M J J U7 U) m f� f� CO O) Q7 O N CO CO LO m N. ma Eci ` 7 o 0 o O V o o y o o O N 0 0 o r C ,- .- .- .5 ,- 1- �,.) le_mi >:. .. a • = CO N N m x y MM�MR U .. O C d N c y a m c coo Q0 0 y (1, (7) d c m U a ch 3 0 a N N 0000 000 I b O) 0000 000 'p a O O O O O O O .Q N at 0 ID N ^ 0 as 00 LO D) aN N d OO 0 0 0 0 0 0 0 OOOO OOO Y Y O CL a m Z 0 0 0 0 0 0 U a° C = m = vo Cn =i u=i ❑ 0 Oo c v v W mp`cop ° a V V = co coN [7 N 0N n CD V 0N N N Ci77'4 VW O O O C) d O_ 0 ' .- N Y N NNNN N N N C C c E N a) O) O Q) m O) m W O) IT! d O. _ E C) C) C) Cl C) CO M C) W O N .E N CO CD CD CD CD CD CD CD CD j N NC 0 W > -, -, H .a W N C) (C+) CO N C) CO V c0 C) O) n )O C) m CCC co o co N- CD )O 0) () .6 cc, N m N n CO O) O O C O C C) CO- CO CO- M CO' V V N L L N N Ont N- N- 00)) N- N- 00)) w W 2 0 ._. 6 N l0 N Y) lO IO lO O O 6 QZn N O C G) In N- N c y m Ni co v m O E CU O C = n C) CO V 0) LO 0 I 0'O d C d V V CO n 0) 0 N 0) 0 L. C d w R 61 C) N V n V 0) 0 y 4-) 0 w .- ,- )- 0 0 0 0)0 V T CO CO K m L m a CO- CO- VI- CO-i CO- CO-i VI- CO- O o 0 o YV) 1 J F r2 Z U) CIG y n T V E c p U m CL O rn M o CO m V o n LO v Cl o m o 1 v of N: 0 CO o a 0) O) 4 N O 0) CO N C O N CO V V (O CO a •C co - C) C) co- co- C) co- C) C) CO N Z a 5 co v 0) n ,- 0 0 -C)ai N N O CO N C) O CO N VVI CO C) 0) V 0) n I N CO CO CO N- N. CD CD LO C i. CO m m m m m m m ao �-. d E A z C) O) (O V N O) LO CO n V N O CO )O V tO O C) co O) V V N N- N N- C) CO CD O) m CO 00 r n CD CD ❑ E c°- 2 2 iO CC) )O LO Y) )O LO )O v v V v v V V V V V V V V V V V GO N L _E _ ^) = LO LO CD a ? a v )O m N A r n m ¢ U a. o m N. 0 CI = CO- N CO u) m m m m m m m m > Q m m m OD m m cc; co U T V m n m .2 m C °�,. y M V 6 m in E d 10 N N = a N O (n0 O L L 4. -, , C ISC cl — •- N Si p ? m l0 @ f9 O 2 . H Z d O_ O_ o_ o_ m 0 O 0 0 0 0 C) r) C) W T m O O O O O O 0) N h al ` N m N- COO O- 0 CO ) M C 4) IMMO Ilia�/' R p C d C O i a y a 07 C N a= o ° :: m m d m V m c.) a. U) ❑ a . . ria BAKER HUGHES North - ALASKA - BP Prudhoe Bay PB J Pad Plan J-29 Plan J-29 Plan #7 Travelling Cylinder Report 15 February, 2013 Ira" BP BAKER Travelling Cylinder Report bp HUGHES 0 Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan J-29 Project: Prudhoe Bay TVD Reference: J-29 plan P272©86.45usft(Parker 272) Reference Site: PB J Pad MD Reference: J-29 plan P272 @ 86.45usft(Parker 272) Site Error: 0.00 usft North Reference: True Reference Well: Plan J-29 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore Plan J-29 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#7 Offset TVD Reference: Offset Datum Reference Plan#7 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,430.21 usft Error Surface: Elliptical Conic Survey Tool Program Date 2/15/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 46.95 1,000.00 Plan#7(Plan J-29) GYD-GC-SS Gyrodata gyro single shots 1,000.00 2,676.00 Plan#7(Plan J-29) MWD+IFR+MS MWD+IFR+Multi Station 2,676.00 10,035.00 Plan#7(Plan J-29) MWD+IFR+MS MWD+IFR+Multi Station 10,035.00 12,349.00 Plan#7(Plan J-29) MWD+IFR+MS MWD+IFR+Multi Station Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) I 2,675.76 2,671.45 9 5/8" 9.625 12.250 10,034.64 8,611.45 7" 7.000 8.750 12,058.67 8,798.56 4 1/2" 4.500 6.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore•Design (usft) (usft) (usft) (usft) EX CC-02A CC-02A-CC-02A-CC-02A Out of range PB J Pad J-03-J-03-J-03 3,800.00 4,075.00 574.92 99.74 479.38 Pass-Major Risk J-08-J-08-J-08 12,312.45 11,400.00 587.81 988.77 -397.28 FAIL-Major Risk J-11-J-11-J-11 9,089.91 9,600.00 1,039.13 654.59 394.22 Pass-Major Risk J-11-J-11APB1-J-11APB1 9,843.57 10,375.00 569.67 594.47 9.74 Pass-Major Risk J-11A_DIMS-J-11A-J-11A 9,843.57 10,375.00 569.67 594.47 9.74 Pass-Major Risk J-14-J-14-J-14 507.22 500.00 189.43 11.28 178.14 Pass-Major Risk J-14-J-14A-J-14A 507.22 500.00 189.43 11.28 178.14 Pass-Major Risk J-15-J-15-J-15 682.29 675.00 80.42 21.13 59.30 Pass-Major Risk J-15-J-15A-J-15A 682.29 675.00 80.42 21.13 59.30 Pass-Major Risk J-15-J-15B-J-15B 682.29 675.00 80.42 21.13 59.30 Pass-Major Risk J-15-J-15B-Plan#4 682.29 675.00 80.42 21.29 59.14 Pass-Major Risk J-16-J-16-J-16 709.77 700.00 34.79 12.14 22.64 Pass-Major Risk J-16-J-16A-J-16A 709.77 700.00 34.79 12.14 22.64 Pass-Major Risk J-16-J-16B-J-16B 709.77 700.00 34.79 12.14 22.64 Pass-Major Risk J-16-J-16BPB1-J-16BPB1 709.77 700.00 34.79 12.14 22.64 Pass-Major Risk J-17-J-17-J-17 1,036.11 1,025.00 137.79 16.75 121.04 Pass-Major Risk J-17-J-17A-J-17A 1,036.11 1,025.00 137.79 16.75 121.04 Pass-Major Risk J-17-J-17B-J-17B 1,036.11 1,025.00 137.79 16.45 121.34 Pass-Major Risk J-17-J-17BPB1-J-17BPB1 1,036.11 1,025.00 137.79 16.45 121.34 Pass-Major Risk J-17-J-17C-J-17C 1,018.38 1,000.00 137.57 16.41 121.15 Pass-Major Risk J-17-J-17D-Plan 2 1,018.38 1,000.00 137.57 16.41 121.15 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 2/15/2013 3:28:50PM Page 2 COMPASS 5000.1 Build 61 BP BAKER Travelling Cylinder Report 0 bp HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan J-29 Project: Prudhoe Bay TVD Reference: J-29 plan P272 @ 86.45usft(Parker 272) Reference Site: PB J Pad MD Reference: J-29 plan P272 @ 86.45usft(Parker 272) Site Error: 0.00 usft North Reference: True Reference Well: Plan J-29 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore Plan J-29 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#7 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB J Pad J-18-J-18-J-18 563.36 550.00 257.58 12.66 244.93 Pass-Major Risk J-18-J-18A-J-18A 563.36 550.00 257.58 12.66 244.93 Pass-Major Risk J-25-J-25-J-25 959.45 950.00 67.83 15.83 52.00 Pass-Major Risk J-25-J-25A-J-25A 959.45 950.00 67.83 15.83 52.00 Pass-Major Risk J-25-J-25A-Plan#6 959.45 950.00 67.83 15.98 51.85 Pass-Major Risk J-26-J-26-J-26 9,315.62 8,925.00 150.88 172.30 -16.12 FAIL-Major Risk J-27-J-27-J-27 2,811.91 2,800.00 149.07 47.89 101.20 Pass-Major Risk J-27-J-27A-J-27A 2,811.91 2,800.00 149.07 47.89 101.20 Pass-Major Risk J-27-J-27B-J-27B 2,811.91 2,800.00 149.07 47.89 101.20 Pass-Major Risk J-28-J-28-J-28 3,500.00 3,550.00 190.00 54.44 139.85 Pass-Major Risk Plan J-29-Plan J-29-Plan#6b J-29 12,343.89 12,050.00 6.47 147.70 -136.69 FAIL-Major Risk Offset Design PB J Pad- J-03-J-03-J-03 offset Site Error: 0.00 usft Survey Program: 100-CB-GYRO-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +WS +E1-W Hole Size Centre Distance Deviation (usft) (usft) (usfl) (usfl) (usft) (usft) 11 (usft) (usft) (in) (usft) (usft) (usft) 46.95 46.95 17.50 17.50 0.00 0.00 94.88 -60.28 706.11 10.937 708.67 0.91 707.76 Pass-Major Risk 54.45 54.45 25.00 25.00 0.01 0.02 94.88 -6028 706.11 10.937 708.67 1.07 707.60 Pass-Major Risk 79.45 79.45 50.00 50.00 0.02 0.10 94.88 -60.30 706.10 10.937 708.67 1.61 707.06 Pass-Major Risk 104.45 104.45 75.00 75.00 0.04 0.18 94.89 -60.36 706.10 10.937 708.67 2.16 706.51 Pass-Major Risk 129.45 129.45 100.00 100.00 0.08 0.26 94.89 -60.45 706.09 10.937 708.67 2.75 705.92 Pass-Major Risk 154.45 154.45 125.00 125.00 0.12 0.28 94.90 -60.56 706.07 10.937 708.67 3.17 705.50 Pass-Major Risk 179.45 179.45 150.00 150.00 0.15 0.30 94.91 -60.65 706.07 10.937 708.67 3.59 705.08 Pass-Major Risk 204.45 204.45 175.00 175.00 0.19 0.32 94.92 -60.74 706.07 10.937 708.68 4.01 704.67 Pass-Major Risk 229.45 229.45 200.00 200.00 023 0.34 94.92 -60.82 706.08 10.937 708.69 4.43 70427 Pass-Major Risk 254.45 254.45 225.00 225.00 026 0.40 94.93 -60.88 706.09 10.937 708.71 4.97 703.73 Pass-Major Risk 279.45 279.45 250.00 250.00 0.30 0.46 94.93 -60.93 706.09 10.937 708.72 5.52 70320 Pass-Major Risk 304.60 304.60 275.00 275.00 0.33 0.53 94.93 -60.96 706.10 10.937 708.72 6.07 702.65 Pass-Major Risk 330.43 330.43 300.00 300.00 0.37 0.59 94.94 -60.96 706.10 10.937 708.71 6.63 702.08 Pass-Major Risk 35626 356.25 325.00 325.00 0.41 0.65 94.96 -60.96 706.10 10.937 708.65 7.18 701.47 Pass-Major Risk 382.08 382.08 350.00 350.00 0.45 0.71 94.98 -60.96 706.08 10.937 708.56 7.74 700.82 Pass-Major Risk 407.91 407.90 375.00 375.00 0.48 0.77 95.01 -60.94 706.07 10.937 708.44 8.30 700.14 Pass-Major Risk 433.73 433.71 400.00 400.00 0.52 0.84 95.05 -60.93 706.04 10.937 70827 8.85 699.42 Pass-Major Risk 459.54 459.52 425.00 425.00 0.56 0.83 95.10 -60.91 706.01 10.937 708.08 920 698.88 Pass-Major Risk 485.35 485.31 450.00 450.00 0.60 0.82 95.16 -60.90 706.00 10.937 707.87 9.55 698.32 Pass-Major Risk 511.15 511.10 475.00 475.00 0.63 0.81 9522 -60.89 705.98 10.937 707.63 9.90 697.74 Pass-Major Risk 536.94 536.87 500.00 500.00 0.67 0.81 95.30 -60.89 705.98 10.937 707.38 10.25 697.14 Pass-Major Risk 562.72 562.63 525.00 525.00 0.71 0.79 95.39 -60.89 705.99 10.937 707.12 10.57 696.55 Pass-Major Risk 588.49 588.37 550.00 550.00 0.75 0.78 95.48 -60.88 706.03 10.937 706.86 10.90 695.96 Pass-Major Risk 61425 614.09 575.00 575.00 0.79 0.76 95.58 -60.86 706.10 10.937 706.59 11.23 695.37 Pass-Major Risk 640.00 639.80 600.00 600.00 0.82 0.75 95.69 -60.84 706.19 10.937 706.33 11.56 694.78 Pass-Major Risk 665.74 665.49 625.00 625.00 0.86 0.81 95.81 -60.81 706.30 10.937 706.06 1211 693.95 Pass-Major Risk 691.46 691.16 650.00 650.00 0.90 0.87 95.93 -60.79 706.42 10.937 705.77 12.67 693.10 Pass-Major Risk 717.17 716.80 675.00 675.00 0.94 0.93 96.07 -60.76 706.55 10.937 705.47 13.23 69224 Pass-Major Risk 74286 742.42 700.00 700.00 0.98 0.99 9621 -60.73 706.69 10.937 705.15 13.78 691.37 Pass-Major Risk 768.54 768.02 725,00 725.00 1.01 1.07 96.37 -60.70 706.83 10.937 704.82 14.39 690.43 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 2/15/2013 3:28:50PM Page 3 COMPASS 5000.1 Build 61 8 ia c''' 0 ` A SO ONE j ___ ----a dooT OOO OO 0 m 8o r g o 8 0�.8 FT3 8 O ' H m m D m p p p p 0 0 N N N,», QN2N2NNNN2xNNxN2H a----� N m# -© p0000 o F t O O O O m m m m m m m co m m m 0 co ,m� c ^p 8:t.s-, nc.vCpp.vCppo.c8 cC� Q- <naaa� _._.. - - -_§M N N N R OC)O�O O—V C V t3 12 o o S H • n ,.� O p p • m i pH" fm0S V 4 8NgS81e2W a p W N g @f F �BrnmNNNceimS ER8co2 ��cc8 N : mr-u-on m�UDm f " a 2 ▪ @ LLao� p H @o�3 # TfV�\ r n ' I 1 o `voa m Q td ya�a rtN3 __ � __. _ z 3iwi -y _ .p 1 -- 8 o q w IIII c� - app . ga-gig - I I) ' c \-', / .11.820 ffl ,91 g_ T. _ - - N ao D ggo0 & Z8 f zo 1- .1- 2N - Ny e• N N rl N o iv E -0 (uyusn 00£)(1 -)4;nos a M . R.• a F O o<d _LU . r Pi O' l m O 0 Z.:: O O 20 t mu m a� . o a� w V• e 3L>>>N� 3UUU�J2F pN R o S -r`'mt > a h. g12 p <. N 2 o d N e � �g u. - . - � mF p. F P PP a NNmmm < mrmmmmmmmm oe000 — o Qreve*v4' " a.om vv" QQvvv*vv**Qv*Q00 00 0110 00 CO 01, 4wua,a Q, r CI, R * *MS r,ms � � �23mm '4Nmh.. * <5ayim^rp. 4mmmmmmmh (u►/Jsn 00z) 43daI j oi.IoA atUj 1 IN .. L. \.• Si I Qss N}+ DI p� C on 0 8 n V m m W L.CC2O F9,W O Wp 88 m 2 F2oo , , W M N YRIV NDN "'000'A'O'A<O CORamNm c.S81� I (J '� p a ` R'O'O ll'l _ _ La�l�A NNmmmmRRv Ii - I - ..(! 8O 'O M c�i N wo88 oo.mmm88888 0 I 1 OO(f+ CbI�O 2 m__ O O O B O O R ,,•-m 0 0 0. .T 0 y O as as m VZ �ONNOmN .-N—a AGO O _ao �O O O 11- 6i Y O,• N 211,! OSOO SH<-S SO - i C Q o� 3a ff8o 88 S8S8 ° - �os y` 3qm 2 g pod-o-o- odoo,acomo rS. ° a a w o n C J _ [/3 Lip=,..,—.50.,.,-.......$0,,,.geC9i.`r`�m`c�,Wrnrnrnocu��8i --o,,v-oo -oo._o a. _- � � a ¢ 1 a mmm–m.,....N–mm� o v N �" a j O r�m cmc» c S N J O rO '988vouoiioiW.2.o?oMmLYS'eA8 U. `� (J W� COGtC000N�NQ-t'ilM-frD �Np -_ _ O _ O� a --n ow 5 O R L O N N N C h p ^ t r. wmLu Nm 0 //y1 C 'Sh{"{p(DS<RNSNg28 8Q GC 0 \` 0 �_; __ •1� V 80)O9CA CECR')! yriiffl CO[p�LAAVL ___ y Q 1g `W -- a —0 C�Jr X00, co...N- mp.0r 0100)10 - :Y !'^ p,S pN N N E CV VS t O ppr coa D an CO f r CO m m O V N 0 200 . 8888,88W )28p p8p p8pMCECpp�S�OL4W _..� �._.f N�' NNN Nrmm..3 l0'O Q § C N NNNmmm mm - C H OHOO OO mHOHHB�In��� �0 —OOII')�AOORVNNSHBOD CC t N _ o I--_N XI ulo p'n o �o _ > C47 C7 w RI' sl C .,m888ommmmmmmmmmmo h- c7 v' m 3 u u u .� f= `F'� 8880QR������ m�N �. o 0 8_ P § § F, 8 g o § N mmmNNrR l�C�gSO���m `O N MI h e 00 0 r ?� Ns—NmR�m r 0OO,NmR.sm^ .�. CV 0S9)43dau teounA an.u, OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME PTD# '7_1 Development Service Exploratory Stratigraphic Test Non-Co entional Well FIELD: may.- POOL: Cf Check Box for Appropriate Le er/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - . API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 11 m .a o < -o co -0 3 I 0 m n o ° °o Tia o ° 5. �* r t"_77 g 0 (7' ^) o W W ClW0 Ill V J o Co --6712. '�v/'l n7 co C1 N 0) O XI 7 n O CD o fD O A _� CD W W W 'i W W W W W W W W W W N N N N N N N N N N . . . . . . -, CO CO V ()) Cn A W N -s ° I ` CO CD V 0) (n A CO Ni — O CO CO V 0) (11 A CO Ni ' CD CO CO 0) (It A CO Ni — 0 --I m —tet 0 CO CD 0 O K c g 0 co co 0 D �, D O 0 C) C) cn 0 v D * 0 m m 0 0 cn * * * c r m z , C) f1 a O co m m_ m m .0 0 o O O = °: 0 0 0 0)i K K c 0 3 = m m m ° o n c m m m M. v m o T� C '/ Q = = Fp is m m < C .0 7 v n a 3 ° CD < _ ° 3 c8i w r' m (o �. 0 v v — Cp m fn c0 0 c c c0 < < o c �_ o _ 0 0 o 0 0 0 0 .. o m N 7 a 0 m v n N CD m °- n 0 °' N m v v o o m ,7-.CD w comaCl) c CD < m -I N 00 co N 7 Cl) N 0 j (en 0 0. N OO n. O_ ,,,co -, 0 a. N 7 7 3 0 0 N CD CD CD (D 3 (D 7 1) �'� O. 0) 7 O" O C) O N 3 N �• < 0 0 . .N+ CD 5 n CS a- CS N 7 C) n n n Q Cl) • r m m m a 0 ° o c o m 0 a C 0 co 77 7 0 c c co n = * 0 0 (D 2) < 0 -o -0 3' 'w m v CO 0 CD j N O N n N O. CO CD O CD CO N N N N -0 CO ? - 7 'o cn N -O — CD CO -0 -0 N 3 "06 N D (2 O N o 3 c C 0) -' o CO 3 N O- CD —, CD n - CD CD 0 "O n A j 'o c C �O CD 6 CD N CD O- (D - (D - m = v) CD = m 0 3 ° CD 3 n (n . -, _0 7 ..-.. 0 m 0 0 3 D) 0 a a -0 (D ° < 0_ n C 0 0 7 0 0 7- O Cl) C -0 "O Co O CD A C O M 0 <. 7 - < n CD Cl) 7 n "0 p 0 o., ? O N = O O N O 3 N O N N CD �' u! CD Q N 0_ N -O a p) 0 Cf) O_ 7 N' 3 Z 3 p .. 0 a r0CD 0 v (D 0 c °7 o c CO 0 0 o 07 m 0 7 7 c ° D x 3 m F Cl)' m 0 0 c 3 0 < o c — 0 m 7 0 0 o 0 0 0 0 3 0 r v m CD o m 0 n v) F a D 0 a; d C30 7 co O a m v o_ -,, c c» 3 3' (o m 0 0 o D c oc� " N cn N 0 *co . a- 0 • =' 0 c2. -0 0 _a (7 0 c0 O o M n o n• c n o o c i 7 0 "0 S N -0 fD 7- CD 7 A CD l0 7 .. —1 .. N 7 7 O CD- LU 3 7 7• n - 3 3 C D Q \/ (p O O 7 q) CD -o O_ < C) < N Ut C/) co o o 3 �� m 0co0o w m 30c -0 0 v0 o ao n m co kV en en 'iii cn Iii> Co -< N CD < 7 co ^ .N. 7 O C ° O n 7 N 0. N < 7 CD c O 0 3 (D c 0 v 3 m c - m o m ' o m co (p 0 n CD 0 CD Cl. QO •°» m' ° 0 0 C N cn N a 3. A CQ fD 7 l0 (� O �' n 6 'o (� O D C C1 O7 cn O c 7 `< O c 2 c ii CD x CCA O O N -0 C) N O� ,.3. N 0- N 0 `� 3 0 0 m m v m W `o m- 0 0 ` o O ED' 0 3 n v < 7 F o 3 w 0 Q A o g3 0 C 0 7 _ `0 5 m 7 0 st v) 7 0 -0 m cn .z -a 0 ° O 0 4t (o 0 3 o 0 o o t34o v n 7 07O v 0 Q1 0, ocn 0 11 L< Z Z Z C Z Z C C C C C C C< C Z 0 0 0 Z -< -< C Z Z Z C 0 0 0 C C C C -< -< -< < Z Z m \ Cl) COCoD D D CD 0 D CD CD CD CD CD CD CD CD D CD CD CD 0 CD CD CD D D D CD CD (D CD CD CD CD CD (D 0 CD D D o.. CoCn CO N N Cl) Cl) Cl) Cl) Cl) (I) Cl) N N N N 0 Cr) N N N Cl) Cn VCl) 1 h3 0 M < v O m 7 ` I -a v o m Z1 "0 -i0 -4 0 O O Z] 7 Z O n 0 CO In x F ° (7 v n () C - O 0 m 0- �_ m 3 0- m ° v c• a rn (o m n 0_ _, 02 Z N m 0 CD m N v a < 0 3 0 c o D 0 m CD 3 c a m c co oco m n. 0 CD Z1 m 5 o CD Fr) (D O y Ni 7 v m m 0 -0 Ccn 00 c� C CD D > m Q N N CD N. '7 • N• 7 < N (n O = N 0 Cl) m - N C<p N r N 7 0 00 n r N N cn 7 _ Z1 X a 0) x 0 c ' 0 N a ° 0 m C CD co 0 O — N _ CD 0 j I cr�. (� n N O 3 co 0 - 3 Cl' = 0 • CD co 7 * V .o- (D Cl) o CJi fa'7 S 0 m coCD 6 xi cr la m o Ni 0 -. o o c CD o 0 m X CO (D Cl) D 0) a CD 7 m C 7 o o 3 CD 0 a (,n 0 0 Z 0 0 (o 0_ Cn 0 -i fD V N Cl) — NJ A Ni 0) CD ° Cl) O L x N n c al Qp 0. 3 -, i N D D CO D C -I b n A CD C). O Co coco -0 coO CC 7 C 0. m 'O Co V " - 0 CD 7 N .7. fnNi m 3 n v Cl)• ° 0 a- F CD ° o C c cD N O a) -, Zi 0 a)) = m CD m Cl) n CD C O 0- K n K c -0 a- = n O 0 CD 0 0 cn 0 n C* n n� 0 Cr (D CO. < 0-. n n — 0 m c0 0 0 CCD O' = 7 °- CD CO N . O. M v X -'m 0 m 0 O 3 Co = CD a a � a co _ o W "' K v) m v - CO = < 'co 7 0 0 a ° m c-n 3 w 0 < 0 C N 7 P- we.) -0 co CD 0 3 c n 7 7 N C — C (T 0 0 0 Cl) Cl)0 co 0 Cl)