Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
189-096
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, January 26, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC Z-18 PRUDHOE BAY UNIT Z-18 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/26/2023 Z-18 50-029-21971-00-00 189-096-0 G SPT 8500 1890960 2125 2682 2677 2677 2674 499 504 504 504 4YRTST P Austin McLeod 12/12/2022 MITIA. 9 bbls calculated to pressure. 30 MinPretest Initial 15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name: PRUDHOE BAY UNIT Z-18 Inspection Date: Tubing OA Packer Depth 0 3505 3474 3458IA 2673 504 45 Min 3448 60 Min Rel Insp Num: Insp Num:mitSAM221212190807 BBL Pumped:12 BBL Returned:11 Thursday, January 26, 2023 Page 1 of 1 12 11 MITIA. 9 bbls calculated to pressure. MEMORANDUM State of Alaska • Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: Friday, November 12, 2010 � I P.I. Supervisor l��j� i� 1© SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC Z -18 FROM: Jeff Jones PRUDHOE BAY UNIT Z -18 Petroleum Inspector Sre: Inspector Reviewed By: P.I. Supry 15e -- NON CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT Z -18 API Well Number: 50- 029 - 21971 -00 -00 Inspector Name: Jeff Jones Insp Num: mitJJ101108063902 Permit Number: 189 -096 -0 Inspection Date: 11/7/2010 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well zis ,Type Inj. w�TVD 8427 ' IA 25 2500 - 2480 2470 P.T.Dj 1890960 , SPT Test psi 2106 OA 1 460 460 460 460 Interval 4YRTS _ P/F P _ T ubing 1200_ 1200 1200 1200 Notes: 7.2 BBLS diesel pumped. 1 well house inspected, no exceptions noted. Friday, November 12, 2010 Page 1 of 1 ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 ~w`p~i,~C'C~s.r ,ti~,. .' ~. e~.~' ~~~ia August 14, 2009 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Z-Pad Dear Mr. Maunder, • bp ~~~~~~~~' OCT 0 5 2009 ~tlas~Ca ail ~ Gas Cons. Con~ni~~ion Anchcrap~ ~~' ~r ~~'~ ~ ~ ~~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • ~ BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date Z-Pad 8J13/2009 Well Name PTD # API # initiai top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitod sealant date ft bbis ft na al Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009 Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7/2M20o9 Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009 Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009 Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009 Z-06 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009 Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009 Z-O8A 1931280 50029217870t00 NA 02 NA 2.55 7/24/2009 Z-O9A 2081410 50029219670100 NA 02 NA 1.70 7/24/2009 Z-10 1891160 50029219860000 NA 1.3 NA 11.10 7/24/2009 Z-11A 2050310 50029220530100 NA 0.2 NA 1.70 7/26/2009 Z-12 1891020 50029219770000 NA 1.2 NA 8.50 7/26/2009 Z-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009 Z-146 2060990 50029218440200 NA 0.2 NA 1.70 7/26/2009 Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009 Z-ts 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009 Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009 Z-18 1890960 50029219710000 NA 02 NA 1.70 7/26/2009 Z-19A 2061050 50029222510100 NA 0.2 NA 1.70 7/26/2009 Z-20 1881000 50029218590000 NA 0.2 NA 1.70 7/26/2009 Z-21A 2001010 50029219380100 NA 0.2 NA 1.70 7/23/2009 Z-226 1960350 50029220370200 NA 0.5 NA 5.10 7/23/2009 Z-238 2041080 50029219500200 NA 0.3 NA 1.70 7/23/2009 Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009 Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009 Z-26A 2060790 50029219450100 NA 0.3 NA 3.40 7/23/2009 Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009 Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25/2009 Z-29 1890650 50029219540000 NA 0.2 NA 1.70 7/25/2009 Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009 Z31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009 Z-328L1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009 Z-33A 1890050 50029218950100 NA 0.5 NA 3.40 8/8/2009 Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009 Z-38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009 Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009 Z-46A 2052030 50029232800100 NA 1.7 NA 13.60 7/26/2009 Z-100 2031710 50029231820000 NA 5 NA 45.90 7/23/2009 Z-101 2001620 50029229780000 NA 1 NA 10.20 7/23/2009 Z-102 2070500 50029233530000 NA 1.5 NA 15.30 7/25/2009 Z-t03 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2009 Z-t08 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009 Z-112 2071720 5oo2s233sooo00 NA surface NA 1. Operations Performed: o Abandon .. STATE OF ALASKA I AlAWA Oil AND GAS CONSERVATION COM SION REPORT OF SUNDRY WELL OPERATIONS JUL 2 8 2006 Alaska Oil & Anchorage ORe-Enter SuspenCJed Well 181 Other Convert to Injector RECEIVED Ion o Repair Well 181 Pull Tubing o Operation Shutdown o Alter Casing o Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 8. Property Designation: 92' ADL 047453 11. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 14317 9216 14190 9145 Length 110' 3138' 13459' 1130' 99519-6612 o Plug Perforations 0 Stimulate o Perforate New Pool 0 Waiver o Perforate 0 Time Extension 4. Well Class Before Work: 5. Permit To Drill Number: ~ Development 0 Exploratory 189-096 o Stratigraphic 0 Service 6. API Number: 50-029-21971-00-00 9. Well Name and Number: PBU Z-18 10. Field / Poo/(s): Prudhoe Bay Field / Prudhoe Bay Pool feet feet Plugs (measured) None feet Junk (measured) 13912 feet Size MD TVD Burst 20" 110' 110' 13-3/8" 3138' 2653' 4930 9-5/8" 13459' 8702' 6870 5-112" 13187' - 14317' 8529' - 9216' 7740 Collapse 2270 4760 6280 13720' - 13928' 8870' - 8997' r ~ "'.' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Tubing Size (size, grade, and measured depth): 4-112", 12.6# L-80 13195' 9-5/8" x 4-112" Baker 'SB-3' Packer; Packers and SSSV (type and measured depth): 9-5/8" x 4-112" Baker 'SB-3' packer 13147'; 13022' Treatment description including volumes used and final pressure: RBDMS BFL JUL 3 1 2006 13. Re resentative Dail Avera e Production or hection Data Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: 0 Copies of Logs and Surveys run 15. Well Class after proposed work: o Exploratory 0 Development 181 Service 181 Daily Report of Well Operations 16. Well Status after proposed work: 181 Well Schematic Diagram 0 Oil 0 Gas 181 WAG 0 GINJ 0 WINJ 0 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Matt Martyn, 564-4101 306-226 Signature Phone Form 10-404 Revised 04/2006 Printed Name Title Technical Assistant Terrie Hubble, 564-4628 Submit Original Only Prepared By Name/Number: 564-4628 ORIGINAL TREE = W8..LHEAD = ACTUATOR = KB. 8..EV = BF. 8..EV = KOP= Max Angle = Datum MD = Datum ND = e Z-18 e from DRLG DRAFT 4-1/16" CrN FMC OTIS 82.41 ' 55.23' 1000' 59 @ 4607' 13,755' 8800'SS 13-3/8" CSG, 68#, L-80, ID = 12.415" I Minimum ID = 3.750" @ 13183' 4-1/2" PARKER SWN NIPPLE I TOP OF 5-1/2" LNR I 14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I 9-5/8" CSG, 47#, NT-80S, ID = 8.681" I 14-1/2" Tbg, 12.6#, L-80, TC-II, 0.152bpf ID=3.958" I 13109' 13459' ÆRFORA TION SUMMARY REF LOG: BHCS ON 03/19/89 ANGLEATTOPÆRF: 51 @ 13720' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 3-3/8" 4 13720 - 13770 0 02/14/91 3-3/8" 6 13792 - 13836 0 05/15/95 3-3/8" 4 13845 - 13928 0 10/07/89 , PBTD I 14317' 14190' 15-1/2" LNR, 17#, L-80, .0232 bpf, ID = 4.892" 2089' H4-1/2" HES X-NIP, ID = 3.813" I 13002' 4-1/2" HES X-NIP, ID = 3.813" 13022' -i 9-5/8" X 4-1/2" BKR SB-3 PKR, ID = 3.87" I 13047' 4-1/2" HES X-NIP, ID '" 3.813' 13115' Tubing Cut w / UMI Overshot 13139' 13147' 13172' 13183' 4-1/2" PARKER SWS NIP, ID = 3.813" -i9-5/8" X 4-1/2" BKR SB-3 PKR I 4-1/2" PARKER SWS NIP, ID = 3.813" 14-1/2" PARKER SWN NIP, ID = 3.725" I 13195' -i4-1/2" WLEG, ID = 3.958" I 13197' H 8..MD TT LOGGED 11/17/921 13661' -1 MARKER JOINT I 13912' -i GL RA LATCH CA M - 09/09/95 I 13930' - IBP PARTS, BANDS, RUBBER - 05/09/95 I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BA Y UNIT 09/10/89 JJM ORIGINAL COM PLETION 09/13/05 JP/TLH FISH DRAWING CORRECTIONS W8..L: 2-18 01/14/91 RIG WORKOV ER 09/24/05 DA V /TLH GL V C/O & PXN PLUG SET PERMIT No: "1890960 05/18/01 RN/TP CORRECTIONS 10/13/05 RPH/TLH WAIVER SFTY NOTE D8..ETED API No: 50-029-21971-00 11/08/02 KB/TLH WAIVER SAFETY NOTE 06/20/06 MJM Proposed RWO Completion SEC 19, T11N, R12E, 984' FNL & 1996' FWL 07/13/05 RMHlPJC GL V C/O 07/15/06 DAV/PJC DRLG DRAFT UPDATES 07/20/05 LWB/PJC GLV ND CORRECTIONS BP Exploration (Alaska) e e PBU Z-18 (Rig Workover) Prudhoe Bay Unit 50-029-21971-00 189-096 Accept Spud: Release: Ri: 07/08/06 N/A 07/14/06 Nabors 7ES PRE-RIG WORK 06/23/06 PULLED P-PRONG AT 13,126' SLM. PULLED 4.5" PXN AT 13,133' SLM - SMALL SECTION OF MIDDLE FIBER RING MISSING. DRIFTED W/4.5" BLB AND 3.70" CENT OUT TBG TAIL AT 13,150' SLM=47' CORR, TBG CLEAR. WELL LEFT S/I. 06/29/06 SET BAKER QUIK DRILL BRIDGE PLUG CORRELATED TO TUBING TALLY DATED 13-JAN-1991. TOP OF PLUG SET AT 13178'. JOB NOT COMPLETE, WILL RETURN TO CHEMICAL CUT THE TUBING. 06/30/06 CHEMICAL CUT THE TUBING WITH 3-5/8" CHEMICAL CUTTER AND ANCHOR BODY AT 13132.5' CORRELATED TO TUBING TALLY DATED 13-JAN-1991. PUNCH THE TUBING WITH SMALL "PINK" TUBING PUNCHER FROM 13064' - 13066',2 FEET INTO THE FIRST FULL JOINT OF TUBING ABOVE GLM #1. STRING SHOT THE TUBING FROM 13123' - 13135' WHICH IS 10' ABOVE AND 2' BELOW INTENDED CUT DEPTH. JOB COMPLETE. e e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 2-18 2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 7/6/2006 Rig Release: 7/14/2006 Rig Number: Spud Date: 9/8/1989 End: 7/8/2006 00:00 - 02:00 2.00 MOB P PRE RD and move rig away from 2-12 for same well row move to 2-18. 02:00 - 04:00 2.00 MOB P PRE Move rig over 2-18. 04:00 - 05:00 1.00 MOB P PRE RU lines and spot pits. Ready to take on fluids. Accept rig at 04:30. 05:00 - 08:30 3.50 MOB P PRE Load pits w/seawater. 08:30 - 09:00 0.50 WHSUR P WHDTRE Pull BPV w/lubricator. 09:00 - 09:30 0.50 WHSUR P WHDTRE RU and tie lines in to tree to circulate diesel out of well. 09:30 - 14:00 4.50 CLEAN P DECaMP Displace 33 bbls. diesel from tubing, pumping down annulus. 126 gpm, 250 psi. Change over and pump down tubing w/Safe Surf 0 followed by heated seawater to displace 120 bbls diesel from annulus. 252 gpm, 600 psi. 14:00 - 15:00 1.00 CLEAN P DECOMP Blow down and RD circulating lines. Set two way check valve and test to 1000 psi f/below. OK. 15:00 - 17:00 2.00 WHSUR P DECOMP ND tree and dress rolled threads in top hanger. 17:00 - 19:00 2.00 WHSUR P DECOMP NU BOP. 19:00 - 00:00 5.00 WHSUR P DECOMP BOP test. w/4" and 4.5" test joints. 250 psi low side, 4000 psi high side test pressure. AOGCC representative Jeff Jones waived AOGCC attendance at test. 7/9/2006 00:00 - 01 :00 1.00 WHSUR P WHDTRE Pull two way check valve w/lubricator. 01 :00 - 01 :30 0.50 WHSUR P WHDTRE MU crossovers and tie into tubing hanger. Back out lock down screws. 01 :30 - 03:00 1.50 PULL P DECOMP Pull tubing hanger to rig floor. 140K Up wt. to free tubing hanger. 150K Up wt. to pull up to floor. Circulate 927 bbls. of heated seawater w/50 bbls. soap sweep down tubing. Take returns up the IA. 540 gpm, 1070 psi. RU Schlum/Camco spooling unit while circulating. MW = 8.5 ppg seawater. 03:00 - 03:30 0.50 PULL P DECOMP Safety stand down. WSL, all hands, all service company personnel. Man lost finger nail when inside mezzanine door slammed on it as he tried to slow door from closing. Discussed accident frequency. Discussed buy in to safety culture. Got individual agreement from each hand on location to slow down and think about where his next action will take him and what will happen after he takes action. 03:30 - 04:30 1.00 PULL P DECOMP Continue w/circulation of 927 bbls. heated seawater. No solids returned w/sweep. 04:30 - 07:30 3.00 PULL P DECOMP LD tubing hanger and 52 jts. 4.5" 12.6# completion. Spool control lines w/Schlum/Camco spooling unit. 07:30 - 08:00 0.50 PULL P DECOMP LD Ball Valve Nipple. RD Schlum/Camco spooling unit. Recovered 19 steel clamps, 4 stainless steel bands, and 7 rubber clamps. 08:00 - 17:00 9.00 PULL P DECOMP LD 4.5" 12.6# completion f/jt. # 53 to jt. #327. LD 6 GLMs. Recovered 3.35' stub w/clean and straight chemical cut on end. 17:00 - 18:00 1.00 PULL P DECOMP RD tubing handling equipment. 18:00 - 20:30 2.50 P DECOMP RU and test w/both 4" and 4.5" test jts. and test lower pipe rams to 250 psi low pressure and 4000 psi high pressure. Test annular preventer 250 psi low and 2500 psi high. Install wear bushing. LD test equipment. 20:30 - 22:30 2.00 CLEAN P DECOMP PU dress mill BHA # 1 w/8.13" external x 4.5" internal mill shoe, x-tension, drive bushing, x-over, 3 boot baskets, 9-5/8" casing scraper, bit sub, lub. bumper sub, oil jar, 2 x-overs, 3 Printed: 7/17/2006 1:50:02 PM e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Z-18 Z-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 7/6/2006 Rig Release: 7/14/2006 Rig Number: Spud Date: 9/8/1989 End: 7/9/2006 20:30 - 22:30 2.00 CLEAN P DECOMP 22:30 - 00:00 1.50 CLEAN P DECOMP 7/10/2006 00:00 - 00:30 0.50 CLEAN P DECOMP 00:30 - 09:00 8.50 CLEAN P DECaMP 09:00 - 11 :30 2.50 CLEAN P DECOMP 11 :30 - 13:00 1 .50 CLEAN P DECOMP 13:00 - 16:30 3.50 CLEAN P DECOMP 16:30 - 17:30 1.00 CLEAN P DECOMP 17:30 - 18:30 1.00 CLEAN P DECOMP 18:30 - 20:30 2.00 CLEAN P DECOMP 20:30 - 21 :30 1.00 WHSUR P DECaMP 21 :30 - 23:30 2.00 WHSUR N SFAL DECOMP drill collars, 2 x-overs. PU 4" HT-40 drill pipe and single in to 1800'. Up wt. 65K, SO wt = 65K. MW = 8.5 ppg seawater. Service rig and topdrive. PU drill pipe f/1800' and tag up on top of stub at 13114'. Install blower hose. Wash over and dress tubing stub to 13121'. PU wt 208K, SO wt 135K. 180 gpm, 365 psi, 15 rpm, 8K tq. Did not see pressure increase as mill went down over stub, torque increased fl7.5K to 12K. Pump 30 bbl. of Hi-Vis (80 vis) sweep w/mill shoe located at 13121'. 507 gpm, 2409 psi. No cuttings over shakers. POH f/13121' to 6000'. MW 8.5 ppg seawater. Up wt. 115K, SO wt. 90K. PU 9-5/8" Halliburton RTTS storm packer. RIH and set 30' below BOP stack. Test packer f/above to 1000 psi. Release and POH w/stormpacker running tool. PU running tool and pull wear bushing. Back out lock down screws in casing flang. Engage 9-5/8" packoff w/pulling tool. PU 45 K (10K over topdrive weight). Pull 9-518" packoff. Wash spool seal area, flush w/water and air to remove injected packoff sealant f/9-5/8" packoff profiles in casing and tubing spools. RIH w/running tool and new 9-5/8" packoff. Seat the packoff. Run in lock down screws. Attempt to test to 5000 psi. Pump up and see bleedoff several times. Pressure test and determine leak path as follows: 1. Pressure up on 9-5/8" packoff test area between upper tubing and lower casing spools w/FMC test pump to 3500 psi, close test valve on FMC hand pump and observe pressure on FMC test pump gauge. 2. Close blind rams and pressue up between blind rams and Halliburton storm packer set 30' below BOP stack to 3500 psi. Close in valves and observe pressure on gauge at drillers panel. 3. Bleed down all pressure on Outer Annulus below 9-5/8" packoff to 0 psi. 4. Pressure held at 3500 psi on 9-5/8" packoff and area between blind rams and storm packer. 5. Bleed down pressure between blind rams and storm packer to 0 psi and the pressure on the FMC gauge covering the test port bled down slowly to 0 psi indicating that the lower packing to the OA was holding and the upper packing to the area between the blind rams and storm packer was not holding. Consulted w/town engineer and decision was made to nipple down BOP and replace the tubing spool on the basis of the above test by: 1. Leaving the the 9-5/8" packoff in place secured by the lock down screws in the top end of the casing flange. 2. ND the tubing spool and the BOP stack above the tubing spool. 3. The lower seals on the 9-5/8" packoff serve as suitable barrier to any pressure or flow which might develop f/the outer Printed: 7/17/2006 1 :50:02 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Z-18 Z-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 7/6/2006 Rig Release: 7/14/2006 Rig Number: Spud Date: 9/8/1989 End: 7/10/2006 21 :30 - 23:30 7/11/2006 23:30 - 00:00 00:00 - 01 :30 01 :30 - 02:30 02:30 - 04:30 04:30 - 06:00 06:00 - 07:00 07:00 - 09:00 2.00 WHSUR N SFAL DECOMP annulus. 4. OA flow/pressure currently O. SFAL DECOMP ND upper tubing spool/BOP stack f/lower casing spool. SFAL DECOMP Cont. to ND BOP stack and tubing spool. SFAL DECOMP NU new tubing spool. SFAL DECOMP Test spool to 5000 psi. Held for 3 minutes and suddenly bled off to 3500 psi. Repressured and bled air out repeatedly. Check for oil signs on top side of packoff. None showing. Bled to 3500 psi. Changed to opposite test plug and retested. Bled off to 3500 psi. Retested w/multiple gauges. Bled off to 2800 psi. SFAL DECOMP NU BOP stack. SFAL DECOMP MU pulling tool. Backout lock down screws. Pull 9-5/8" packoff and check seals. SFAL DECOMP Pick up 9-5/8" packoff pulling tool. Back off lock down screws. Pull packoff. Seals on packoff damaged. Redress packoff. Install packoff. Run in lock down screws. Test packoff to 5000 psi. OK. Test BOP flange to 250 psi low and 4000 psi high pressure. Run wear bushing. MU RTTS retrieving tool. Sting into RTTS and release packer. Pull to floor and LD RTTS. Pressure test 9-5/8" annulus to 4000 psi and hold w/chart for 30 mins. POH f/5600' to BHA. MW = 8.5 ppg. LD cleanout BHA # 1. Saw clear indication that internal 4.5" mill had milled down and rotated on top of 1st collar below top of tubing stub. PU Plug Milling BHA #2 including: 3.7" OD bladed junk mill, x-over box x box, float sub, x-over pin x pin, shear thru guide (10K shear screws) w/8.13" OD x 4.5" ID cleanout shoe, 3 jts. PAC drill pipe, 2 x-overs, lubricated bumper sub, oil jar, 2 x-overs, 3 drill collars, 2 x-overs and HT-40 drill pipe back to surface. DECaMP RIH w/BHA #2 to 8824'. DECOMP Cont. RIH f18824' and tag up on top of stub at 13121' w/8.13" OD shear thru guide. PU above stub. Establish parameters. Up wt. 217K, SO wt 130K, rot. wt. 155K, tq. off 8.3K, gpm 176, psi 707, rpm 40. DECOMP SO w/indicating shear sub on top of tubing stub and see indicating sub shear w/18K. RIH w/2-7/8" PAC passing through 8.13" indicating shear sub. Tag up on bridge plug at 13160'. Establish circulation. Up wt. 215K, SO wt. 135K, rot. wt. 155K, 119 gpm, 340 psi, tq. off 7.5 K, tq. on 8.2-8.7K, 2-5K WOB. Mill 4.5" Baker composite bridge plug in tubing tailpipe at 13160'. W/20 mins. milling time lost circulation briefly at breakthrough. Fluid loss at break through point = 22 bbls in 2 minutes. Continue milling w/fair returns and still drilling on plug for 10 mins and then plug dropped away free. Push plug out end of tailpipe at 13200'. Push plug into open hole until tag up of 4" drill pipe x 2-7/8" PAC X-over on top of indicating shear sub at 13121' on top of 4.5" tubing stub w/mill positioned 0.50 WHSUR N 1.50 CLEAN N 1.00 CLEAN N 2.00 CLEAN N 1.50 CLEAN N 1.00 CLEAN N 2.00 CLEAN N 09:00 - 10:00 1.00 CLEAN N SFAL DECOMP 10:00 - 11 :00 1.00 CLEAN P DECOMP 11 :00 - 11 :30 0.50 CLEAN P DECOMP 11 :30 - 14:30 3.00 CLEAN P DECaMP 14:30 - 15:30 1.00 CLEAN P DECaMP 15:30 - 19:30 4.00 CLEAN P DECOMP 7/12/2006 19:30 - 00:00 00:00 - 02:00 02:00 - 03:30 4.50 CLEAN P 2.00 CLEAN P 1.50 CLEAN P Printed: 7/17/2006 1:50:02 PM .. I e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Z-18 Z-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 7/6/2006 Rig Release: 7/14/2006 Rig Number: Spud Date: 9/8/1989 End: 7/12/2006 02:00 - 03:30 1.50 CLEAN P DECOMP below 4.5" tailpipe WLEG at 13224'. 03:30 - 05:30 2.00 CLEAN P DECOMP Fluid losses at 70 bbls/hr. Pull mill back into tailpipe wIno overpull. CBU 757 bbls at 400 gpm, 3035 psi. Small amount of gas back to surface at bottoms up. 05:30 - 12:00 6.50 CLEAN P DECOMP POH w/BHA #2. LD 288 jts drill pipe. Stood back 40 stands in derrick. MW = 8.5 ppg. Losing 70 bbls fluid/hr. 12:00 - 15:00 3.00 CLEAN P DECaMP LD plug milling BHA #2.· Function test rams. MW 8.5 ppg. 15:00 - 17:00 2.00 RUNCO RUNCMP RU to run 4.5" 12.60# L-80 TC-II completion. Pull wear bushing. Make test run and seat tubing hanger. OK. 17:00 - 00:00 7.00 RUNCMP Run completion to 3362'. Baker-Lok on pins all jts.of tailpipe up to packer. 24 hrs fluid losses = 794 bbls. Losses at 23:59 = 20 bbls/hr. 7/13/2006 00:00 - 06:00 6.00 RUNCMP Run 4.5" 12.60# L-80 TC-II completion to 8050'. MW 8.5 ppg. Well taking seawater 20 bbls/hr. 06:00 - 10:00 4.00 RUNCO RUNCMP Run 4.5" 12.60# L-BO TC-II completion to 13115' and tag up on stub. PU wt. 165K, SO wt. 100K. 10:00 - 10:30 0.50 RUNCO RUNCMP RU to circulate. 10:30 - 12:00 1.50 RUNCO RUNCMP Circulate, wash down to 13121' and swallow stub and tag up on top of collar at bottom of stub w/Unique overshot. Saw pressure increase slightly when going down over stub. Saw weight going down on shearpins and pins sheared w/12K of downweight. PU tubing hanger and space out w/one pup below top jt. 12:00 - 14:00 2.00 RUNCO RUNCMP RIH and work Unique overshot over stub. Pump 121 gpm, 135 psi to get over stub. Land tubing. Run in lock down screws. 14:00 - 15:30 1.50 RUNCO RUNCMP Attempt to reverse circulate. 850 psi total of 60 strokes. No circulation. 15:30 - 20:00 4.50 RUNCO RUNCMP Back out lockdown screws. Attempt to circulate at 850 psi for 50 stks. PU to 13108' and reverse circulate 600 bbls. inhibited seawater at 3 bpm, 100 psi to the 4.5" x 9-5/8" annulus. 20:00 - 21 :30 1.50 RUNCO RUNCMP RU Hot Oil Service to reverse circulate 117 bbls of diesel to annulus at 2 bpm, 550 psi. 21 :30 - 23:00 1.50 RUNCO RUNCMP Close in annulus. Use Hot Oil Svc. to bullhead 33 bbls of diesel down the tubing. 1.5 bpm, 460 psi. SO and land tubing w/Unique Overshot swallowing 3' of tubing stub. Top of stub at 13115' and overshot down to 13118'. Drop ball and rod and run in lock down screws on tubing hanger. 23:00 - 00:00 1.00 RUNCO RUNCMP Set packer by pressuring up to 2800 psi. (NOTE: Invited AOGCC to attend pressure test of this injection well annular casing test. Jeff Jones, AOGCC rep, left phone message waiving AOGCC presence at the test.) Continue pressuring up to 4000 psi and hold for 30 min tubing test w/chart. OK. Bleed down tubing to 1800 psi and pressure up on annulus to 4000 psi. OK. Hold for 30 min 4.5" x 9-5/8" annulus test w/chart. OK. Bleed pressure both sides to 0 psi. 7/14/2006 00:00 - 02:00 2.00 RUNCO RUNCMP Pull landing jt. Install two way check valve. Pressure test f/above to 1000 psi as no test possible f/below. ND BOP stack. 02:00 - 06:00 4.00 RUNCO RUNCMP NU adapter flange and tree. Test flange, adapter, and tree to 5000 psi. RU drill site maintenance and pull two way check w/lubricator. Install back pressure valve. Can not be tested f/below wIno GLMs in well and packer set. Secure well. Release rig. Printed: 7/17/2006 1:50:02 PM e e FRANK H. MURKOWSKI, GOVERNOR AItASIiA. OIL AND GAS CONSERVATION COMMISSION 333 W. 7T" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dave Wesley Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 2-18 Sundry Number: 306-226 r·. ~) Dear Mr. Wesley: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED thisJ!! day of June 2006 Encl. ; " h /,0 .(,)~J>Þ' f{f~ t/¿7/0b . w~(jz~ {z.c,oc, ., STATE OF ALASKA e RECE\ ALASKA OIL AND GAS CONSERVATION COMMISSION JUN 2 2 2006 APPLICATION FOR SUNDRY APPROVA~ c s commission 20 AAC 25.280 Alaska Oil & Gas on. Anchorage 1. Type of Request: 0 Abandon o Alter Casing o Change Approved Program o Repair Well 0 Plug Perforations 0 Stimulate ~ Pull Tubing 0 Perforate New Pool 0 Waiver o Operation Shutdown 0 Perforate 0 Time Extension Convert to Injector / ~ Other o Re-Enter Suspended W 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Well Class Befre Work: ~ Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number 189-096 ",..-' 6. API Number: // 50- 029-21971-00-00 /" 99519-6612 92' 9. Well Name and Number: PBU Z-18 ,./ 8. Property Designation: 10. Field / Pool(s): ADL 047453 Prudhoe Bay Field / Prudhoe Bay Pool 11. . '. . . . .' Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft)· Plugs (measured): Junk (measured): 14317 9216 14190 / 9145 None 13912 Casing Lenath Size MD / TVD Burst Collapse Structural Conductor Surface Intermediate Production Liner 110' 20" 110' 110' 3138' 13-3/8" 3138' 2653' 4930 2270 13459' 9-5/8" 13459' 8702' 6870 4760 1130' 5-1/2" 13187' -14317' 8529' - 9216' 7740 6280 Perforation Depth MD (fty. I Perforation Depth TVD (ft): I 13720' - 13928' I 8870' - 8997' Packers and SSSV Type: 9-5/8" x 4-1/2" Baker 'SB-3' packer; 9-5/8" x 4-1/2" Baker 'SB-3' packer 12. Attachments: ~ Description Summary of Proposal 0 BOP Sketch o Detailed Operations Program 14. Estimated Date for Commencing Operations: Tubing Grade: Tubing MD (ft): L-80 13195' I Packers and SSSV MD (ft): ~:; / 13. Well Class after proposed work: ~ o Exploratory 0 Development ~ Service Tubing Size: I 4-1/2", 12.6# 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name 9}lve Wesley ./ ~ Title Senior Drilling Engineer Sianature ~ :/L ~ I ( J- Phone 564-5153 Date ((¿/z.¡/o P , U Commission Use Only JUlkio06 Dðté: 15. Well Status after proposed work: OOil o Gas ~ WAG 0 GINJ o Plugged OWINJ o Abandoned o WDSPL Contact Matt Martyn, 564-4101 Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness o Plug Integrity ~OP Test rn1Áechanicallntegrity Test 0 Location Clearanê:ê I Sundry Number: ;:znlf) - :1:::U/) ~ Other: T -tS t ßO e E to ~SOc::> )t'ç ¿. M I T tl"eh.~~d. (Ìu,vS¡,{,~~t to LoA-1\-{ 7-5.4IL Lb)) '''~f.¥ de.¡;rL- "uy-"~c..e i(..t:tfPVIJ\I~J. Subsequent Form Required: 10 - 4D>~q¿ß If APPROVED BY /" ð /' Approved By: r- '. . ¡COMMISSIONER THE COMMI~SIO~ Date ~',lj ð" Fooo 1Q-40' R..,;ood 0712005 0 R I G)'N w Y R B fY.YJ6 l WI ok: <J' Ubmitt' Duplicate e e Well Status: Well Z-18 was drilled and completed 9/89. A RWO was performed in 1991 to replace 3.5" tubing with 4.5" tubing in preparation for a hydraulic fracture treatment. The well was shut in 1998 and returned to production in 2000 at 200 bopd, 80% WC, 1500 GOR; additional water influx seems to have occurred during the 2 year shut in period. There is a history of both intermediate casing hanger leakage and tubing hanger seal leakage. The outer annulus was downsqueezed with gelled diesel with cell flake additives 8/04. The well currently is shut in with TxlA communication and secured by a tubing tail plug. / Proiect: The scope of work includes a chemical cut of the tubing above the packer. the existing tubing will be cut and pulled, 9 5/8" packoff replaced, and 4.5" premium thread L-80 tubing rerun. The completion will consist of 4-1/2" L-80 premium thread tubing, in a stacked packer configuration, and no GLMs. Area Review ¿ There are no wells within 14 mile radius of Z-18. The cement job on the 5-Yz" liner went smoothly and was logged in November, 1989. Enclosed is a copy of the CBL log showing cement isolation between the 9-5/8" casing shoe at 13,459' md and the top perforation at 13,720' md. ___ Pre-RWO 1. Check wellhead lock down screws. (Unable to check wellhead seals due to remedial plastic packing) 2. Remove PXN plug from tubing tail and drift for chemical cut and FasDrill. 3. Set FasDrill plug in tubing tail just below packer (~13,167'ftd). 4. Chemical Cut 4Yz" tubing above packer (~13,13l' md). ~ 5. Circulate well clean with seawater and freeze protect with diesel. 6. Pressure test TxlA 7. Set BPV in tubing hanger 8. Remove well houses and flow lines. Prepare pad for rig. RWO 1. MIRU work over rig. 2. Pull BPV. Circulate out diesel freeze protect. Circulate to seawater (kill weight fluid). 3. Install TWC and test. ND tree and tubing head adapter flange. . 4. NU BOPE and test per BP and AOGCC regulations. Test the BOPE to 250 psi low and 3500 psi / high. Test the annular to 250 psi low and 3500 psi high. Pull the TWC with lubricator 5. PU landing joint or spear and make-up into the tubing hanger. Pull and lay down the tubing hanger. 6. Pull and lay down the 4Yz"- 12.6#, L-80 tubing to the cut @ ~13,13l ft md. ./ 7. RIB wi scraper & cleanout 9-5/8" casing to tubing stub. 8. Set R TTS Packer below the wellhead and replace 9-5/8" casing packoff. 9. Pressure test 9-5/8" casing and packoffto 3500 psi for 30 minutes. 10. RIB and dress the tubing cut (internal and external) in preparation for UMI overshot. 11. RIB with DP and drill out tubing tail plug. 12. Run 4-Yz", 12.6 #/ft, L-80, premium thread tubing and overshot. Locate new tubing onto existing / tubing stub. 13. Circulate corrosion inhibitor down the IA. 14. Freeze protect IA and tubing to ~2200'. 15. Drop the ball and rod. Set the packer. / 16. Test the tubing and IA to 3500 psi for 30 minutes. 17. Install TWC and test. / 18. ND BOPE and NU adapter flange and tree. Test to 5000 psi. 19. RDMO workover rig. Post-RWO 1. Pull ball and rod from RHC sleeve. 2. Pull RHC sleeve. 3. Tie-in flow lines, replace well houses, and instrumentation. 4. If required by the state, perform post rig logging to confirm zonal isolation above top perforations in 5-Yz" liner for injection conversion. Wellbore temperature log, cement bond log, or RST Waterflow log (up flow mode) could be used for this confirmation. . ~NOTES: I 'TREE = 4-1/16" crvv e Z-18 W8..LHEAO= FMC / . ACTUATOR = OTIS KB. 8..8/ = 91.55' BF. 8..8/ = 55.23' KOP= 1000' 2127' -14-1/2" OTIS SSSV NIP, 10 = 3.813" I Max Angle = 59 @ 4607' . I Datum MD = 13,755' DatumTVD= 8800' SS GAS LIFT MANORa.s ST MO TVO 08/ TYÆ VLV LATCH PORT OATE I 13-3/8" CSG, 68#, L-SO, 10 = 12.415" I 3138' 1----4 ~ 6 3694 2973 55 MERLA DMY RM 0 09/23/05 5 808S 5395 55 MERLA OMY RM 0 09/23/05 4 10394 6827 51 MERLA DMY RA 0 U 3 11640 7583 53 MERLA OMY RA 0 Minimum ID = 3.750" @ 13183' 2 12454 8077 53 MERLA OMY RA 0 1 13110 8481 52 MERLA DMY RA 0 4-1/2" PARKER SWN NIPPLE I . I 13139' 14-1/2" PARKER SWS NIP, 10 = 3.813" I t8 2S 13147' -i 9-5/S" x 4-1/2" BKR SB-3 PKR 1 I . I 13172' 4-1/2" PARKER SWS NIP, 10 = 3.813" I I TOP OF 5-1/2" LNR I 13186' 13183' -14-112" PARKER SWN NIP, 10 = 3.750" I . . -- 13183' -14-1/2" PXN A...UG (09/24/05) I 14-1/2" TBG, 12.6#, L-SO, .0152 bpf, 10 = 3.958" I 13195' I , I 13195' -14-1/2" WLEG, 10 = 3.958"1 I 9-5/8" CSG, 47#, NT-80S, 10 = 8.681" I 13459' -¡.-. II!. 13197' H 8..MD TT LOGGED 11/17/92 I I 13661' H MARKER JOINT I ÆRFORA TION SUMMARY REF LOG: BHCS ON 03/19/89 ANGLEATTOPÆRF: 51 @ 13720' ] Note: Refer to A"oduction OB for historical perf data SIZE SPF INTERV AL Opn/Sqz OATE 3-3/8" 4 13720 - 13770 0 02114/91 ~ 3-3/8" 6 13792 - 13836 0 05/15/95 3-3/8" 4 13845 - 13928 0 10/07/89 ., I 13912' H GL RA LATCH CA M - 09/09/95 I I ., I 13930' -f IBP PARTS, BANDS, RUBBER - 05/09/95 I I PBTD I 14190' I I 5-112" LNR. 17#, L-80, .0232 bpf, 10 = 4.892" I 14317' I OATE REV BY COMMENTS OATE REV BY COMMENTS PRUOHOE BAY UNIT 09/10/89 JJM ORIGINAL COM PLETION 09/13/05 JPITLH ASH ORA WING CORRECTIONS W8..L: Z-18 01/14/91 RIG WORKOVER 09/24/05 OA V ITLH GLV C/O & PXN A...UG SET PERMIT No: '1890960 05/18/01 RNITP CORRECTIONS 10/13/05 RPHITLH WAIVER SFTY NOTE Da.ETED API No: 50-029-21971-00 11/08/02 KBITLH WAIVER SAFETY NOTE SEC 19, T11N, R12E. 984' FNL & 1996' FWL 07/13/05 RMHlPJC GL V C/O 07/20/05 LWB/PJC GL V TVO CORRECTIONS BP Exploration (Alaska) z-. Proposed C~pletion 'TREE = WELLHEAD \:: ACTUA TOR = KR 8..EV = BF. ELEV = KOP= Max Angle = Datum MD = Datum TVO = 4-1/16" CroN FMC OTIS 91.55' 55.23' 1000' 59 @ 4607' 13,755' 8800' SS 13-3/8" CSG, 68#, L-80, ID = 12.415" I Minimum ID = 3.750" @ 13183' 4-1/2" PARKER SWN NIPPLE I TOP OF 5-1/2" LNR I 14-1/2" TBG, 12.6#, L-80, .0152 bpf. 10 = 3.958" I 9-5/8" CSG, 47#, NT-80S, 10 = 8.681" I 4-1/2"Tbg, 12.6#, L-80, TC-II, 0.152bpf 10=3.958" I 13131' 13186' ÆRFORA TION SUMMARY REF LOG: BHCS ON 03/19/89 ANGLEATTOPÆRF: 51 @ 13720' Note: Refer to A"oduction DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DATE 3-3/8" 4 13720 - 13770 0 02/14/91 3-3/8" 6 13792 - 13836 0 05/15/95 3-3/8" 4 13845 - 13928 0 10/07/89 I PBTD I 14317' 14190' 15-1/2" LNR, 17#, L-80. .0232 bpf,10=4.892" I /' 2100' -14-1/2" HES X-NIP, 10 = 3.813" 13029' 14-1/2" HES X-NIP. ID = 3.813" I 13041' -i 9-5/8" X 4-1/2" BKR SB-3 PKR I 13068' 4-1/2" HES X-NIP, 10 = 3.813" 13131' Tubing Cut w / UMI Overshot 13139' 13147' 13172' 4-1/2" PARKER SWN NIP. 10 = 3.750" 4-1/2" PARKER SWS NIP, 10 = 3.813" -19-5/8" X 4-1/2" BKRSB-3 PKR I 4-1/2" PARKER SWS NIP, 10 = 3.813" 13183' 13195' -14-112" WLEG, 10 = 3.958" 13197' H ELMOTILOGGED11/17/92 13661' -i MARKER JOINT I 13912' -1 GL RA LATCH CAM - 09/09/95 I 13930' -1 IBP PARTS, BANDS, RUBBER - 05/09/95 I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BA Y UNIT 09/10/89 JJM ORIGINAL COM PLETION 09/13/05 JPITLH FISH ORA WING CORRECTIONS WELL: Z-18 01/14/91 RIG WORKOVER 09/24/05 OA V /TLH GL V C/O & PXN PLUG SET PERMIT No: '1890960 05/18/01 RN/TP CORRECTIONS 10/13/05 RA-VTLH WAIVER SFTY NOTE DELETED API No: 50-029-21971-00 11/08/02 KBITLH WAIVER SAFETY NOTE 06/20/06 MJM A"oposed RNO Completion SEe 19, T11 N, R12E, 984' FNL & 1996' FWL 07/13/05 RMHlPJC GL V C/O 07/20/05 LWB/PJC GLV TVOCORRECTIONS BP Exploration (Alaska) .... ITEM LENGTH TOP BOTTOM 4-1/2" WlEG TDS 1 .00 1 3 1 93.88 1 3 1 94.88 "" 4-1/2" PUP JOINT. TDS 9.91 1 3 1 83. 97 1 3 1 93.88 l 4-1/2" SWN NIPPLE TDS 1 .30 1 3 1 82.67 1 3 1 83.97 .,J. 4-1/2" PUP JOINT. TDS 9.92 1 3 1 72.75 1 3 1 82.67 '" 4-1/2" SWS NIPPLE. TDS 1 1 2 1 3 1 71 63 1 3 1 72.75 . 4-1/2" PUP JOINT.. TDS 9.90 1 3 1 61 .73 1 3 1 7 1 63 V. 4-1/2" PUP JOINT ·TDS 3.23 1 3 1 58.50 1 3 1 6 1 .73 . XO 7" ACME BOX X 4-1/2" TDS PIN 0.85 1 3 1 57.65 1 3 1 58.50 ./ BAKER Mill-OUT EXTENSION 6.30 1 3 1 51 .35 1 3 1 57. 65 ~ 9-5/8" BAKER SB-3 PACKER 4.54 1 3 1 46.8 1 1 3 1 51 .35 '" I BAKER E-22 TUBING ANCHOR 0.68 1 3 1 46. 1 3 1 3 1 46.8 1 '" 4-1/2" PUP JOINT. TOS 5.95 1 3 1 40. 1 8 1 3 1 46. 1 3 ". 4-1/2" SWS NIPPLE TDS 1 .1 7 1 3 1 39. 01 1 3 1 40. 1 8 ,/ 4-1/2" PUP JOINT TOS 9.90 1 3 1 29. 1 1 1 3 1 39.0 1 "'. 4-1/2" PUP JOINT TDS 9.89 1 3 1 1 9.22 1 3 1 29. 1 1 "'9 14-1/2" GlM #1 TDS 9.5 1 1 3 1 09.7 1 1 3 1 1 9. 22 , 4-1/2" PUP JOINT. TOS ....... 9.78 1 3 099. 93 1 3 1 09. 7 1 4-1 /2"} TBG TDS fJTS#1 -#1 6\ 626 63 1 2 473.30 1 3 099.93 4-1/2" PUP JOINT. TOS 9.93 1 2 463,37 1 2 473.30 4-1/2" GLM #2 TDS 9.49 1 2 453.88 1 2 463.37 4-1/2" PUP JOINT TDS 9.77 1 2 444. 1 1 1 2 453.88 4-1 /2" TBG. TOS fJTS#17-#36\ 785.25 1 1 658.86 1 2 444 1 1 4-1/2" PUP JOINT TOS 9.3 1 1 1 649. 55 1 1 658.86 4-1/2" GlM #3 TOS 9.50 1 1 640. 05 1 1 649.55 4-1/2" PUP JOINT TDS 9.76 1 1 630. 29 1 1 640.05 4-1 /2" TBG TDS (JTS #37-#67\ 1 217.09 1 0 4 1 3. 20 1 1 630. 29 14-1/2" PUP JOINT TDS 9.48 1 0 403.72 1 0 4 1 3.20 4-1/2" GlM #4 TDS 9.47 1 0 394.25 1 0 403. 72 4-1/2" PUP JOINT TOS 9.77 1 0 384.48 1 0 394.25 4-1/2" TBG TOS (JTS#68-#1 25\ 2 277 .34 8 1 07. 1 4 1 0 384. 48 4-112" PUP JOINT TOS 9.48 8 097.66 8 1 07. 1 4 4-1/2" GlM #5 TOS 9.56 8 088. 1 0 8 097.66 4-1/2" PUP JOINT TDS 9.70 8 078.40 8 088 1 0 4-1/2" TBG TOS (JTSlt1 26-#236\ 4 365. 1 5 3 7 1 3 .25 8 078.40 4-1/2" PUP JOINT TOS 9.47 3 703.78 3 71 3.25 4-1/2" GlM #6 TOS 9.52 3 694.26 3 703 .78 4-1/2" PUP JOINT TDS 1 0.08 3 684. 1 8 3 694 .26 4-1/2" TBG TDS f JTS#237 -#275\ 1 538.8 1 2 1 45.37 3 684. 1 8 4-1/2" PUP JOINT TOS 9.91 2 1 35.46 2 1 45 .37 4-1/2" FLOW COUPLINGS TOS 5.74 2 1 29.72 2 1 35 .46 4-1 /2' BVN TOS 2.68 2 1 27. 04 2 1 29 .72 4-1/2" FLOW COUPLINGS TDS 5.74 2 1 21 30 2 1 27 .04 4-1/2" PUP JOINT TDS 9.9 1 2 1 1 1.39 2 1 21 30 4-1/2" TBG TOS ( JTS#276-#327\ 2 040.25 71 1 4 2 1 1 1 39 4-1/2" SPACE OUT PUP JT TDS 4.03 67. 1 1 7 1 1 4 4-1/2" SPACE OUT PUP JT TOS 9.92 57. 1 9 67. 1 1 4-1/2" SPACE OUT PUP JT TDS 9.92 47.27 57. 1 9 4-1/2" SPACE OUT PUP JT TOS 9.91 37.36 47.27 4-1/2" TUBING HANGER TOS 3. 1 4 34.22 37 .36 RIG 16 KB. TS 23.00 1 1 .22 34.22 CORRECTION (RIG 1 6 KB TO OKB) 1 1 .22 0.00 1 1 .22 RIG 16 KB- TS IS 23.00' ORIGINAL KB-BF IS 36.32' RIG 1 6 KB-BF IS 25.10' e e ME CHAN I CAL INTEGRITY REl'ORT' .... '-"'UD "",,~- .: =- u.~..;...:. : 9/ ~ /lq f~' I 0 f I" II q -iq I - OPER & FIELD B P V P...lA... Ì\'""ELL NUMBER 1:: . I ~ :.~G REL::;'.S~: I ~q ~ 0'1{P -,.;1:LL DATA m: J4šlì.MD. q'u~ TVD; :?ETD: 14-I~o MD Q¡4STVD Casi~6: q.S/¡" Shoe: 13f"57 HD elo2.TVD¡ DV: H.D -T\tu _:":ìe~: 5- '/2. " Shoe: 14~1 Î ill) 92./(P TVD; ~,",T' ¡?/97 HD g:;2.q -=- ~ tD .:..L'r: :-'...lOi:;g: 4 .I/J.. " Packe:!:" , ~ I q)" till rVD; Set: a.t I ~ 14 7 :.ole Size 11 - '14 ./ ana f'/ILH Perfs 1~7'-O to I ~92f :-:EC?.ÞJ-rICl-...L INTEGRITY - P1Œ.T ¡ 1 Annulus Press Test: 7~ 15 min 30 min Comments: MIT ,(olb ~vJ J ' ",..- :-ŒCHÞ_1-ECAL INTEGRITY - PART J2 3 5 Cement Volumes:' þ...mt. Liner 4f) {2;f ; Csg Z.Q27 {!{ i DV Cüt 701 to cover pe:!:"£s ')'"27 US l"'ðt.tÂh.,Id t..-o (Ave,,· Þv /21rr L- . , , + Soo I /l.Il > C'~ e-t c..t' ':.. ç . Theore tical TOC I Z ¿. q ç I ~ ~ ~O'9ð e~LPsç ~/otu Me ' Cement Bond Log (Ye.s or No) '1 In AOGCC File ·Ai CBL Evaluation, zone above perfs J~ C/~T dA-kJ AJe ð IÂ-.(!j t< l)Av t. a;' f 'c, I ) ~ cLù,~,f¡ ¡ ! I /O{&!/Cjf9, Prociuc..tion Log: Type -- Evalu.ation CONC:LUSIONS: ? ar t: if 1: /tit r T V'/ð tvC h..t d . ?ar~ 12, k t V()/' ~ U!.T ,":tUc"þ /;>\.edA' ì)t1ë"'J~;hJ !U- cÆvv,-.W'---~ Jo Of fJ ro 1/ Cc (. V--l6 W~ iP/2C( ¡wof-, 18 is a 1(00) 5DJ 1cm :J2 :õ .c ffD Q) ...- q¡ a::: Õ 100 ffi to to water I A1æe f'o.Iam Di En::! Råe Råe Prod Qrn Dá:e Reserves EUR Faecast Erded Faecast Dá:e :QI : o.1œ812Ae. . 3E62.5 Mti : 1Q'31f2a)4 . 36.a::ø Mti : El.f:6Mti : Råe 10 01a2030405œ07 00 91 92 93 94 9:5 00 97 00 g;¡ ¡f/þ 1(00) 5ŒI) "ö ::::. .0 .o5I) .J!:! ro a::: Õ 100 A1ase b 10 o :01 : 49.458 i::ö'd · œJ?D'2ffJ3 ::m.5i\t1::tj · 10'3112D4 :Oi\t1::tj · Râ:e 7&J 1&D Qm Ot Fro::!, i\t1::tj 2250 3IO 37&J , STATE OF ALASKA ALA... .1 OIL AND GAS CONSERVATION COMI\".J~ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 92 KB 8. Property Designation: ADl-04 7 453 11. Present Well Condition Summary: Total Depth measured 14317 true vertical 9216.04 Effective Depth measured 14190 true vertical 9145.45 Casing Conductor Production Liner length 80 13425 1131 Size 20" x 30" 9-5/8" 47# NT80S 5-1/2" 17# l-80 Perforation depth: Measured depth: 13720 - 13770 True Vertical depth: 8869.97 - 8901.33 Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of logs and Surveys Run Daily Report of Well Operations Oil-Bbl o o x Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl. Casing Pressure o 0 540 o 0 520 15. Well Class after Droposed work: Exploratory r Development P' 16. Well Status after proposed work: Oil R' Gas r WAG r Plug Perforations [] Perforate New Pool D Perforate D 4. Current Well Class: Development ß?1: Stratigraphic C: feet feet feet feet MD 36 - 116 34 - 13459 13186 - 14317 13792 - 13836 8914.98 - 8941.96 4-1/2" 12.6# 4-1/2" Baker SB3 Packer 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sharmaine Vestal RECEIVED nCT 1 9 7005 Stimulate D Othert] WaiverD Time~t¡«åi<m[i Gas Cons. Commission Re-enter Suspe'rìèIêd Well D Anchorage 5. Permit to Drill Number: Exploratory 189-0960 Service 6. API Number: 50-029-21971-00-00 9. Well Name and Number: 2-18 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE Oil Pool Plugs (measured) Junk (measured) 13183 13912, 13930 TVD 36 - 116 34 - 8702.21 8528.3 - 9216.04 Collapse Burst 6870 7740 4760 6280 13845 - 13928 8947.43 - 8997.03 l-80 34 - 13195 13147 ~ÇANNE[) NO\f 0 3 2005 Tubing pressure 1550 1620 Service r GINJ r í WINJI WDSPL Sundry Number or N/A if C.O. Exempt: N/A Printed Name Sharmaine Vestal _ / Signat~~~·~ o RIG I N A LRBDMS BFl OCT 2 0 2~bmit Original Only Form 10-404 Revised 04/2004 Title Data Mgmt Engr Phone 564-4424 Date 10/18/2005 ) ) Z-18 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY I ACTIVITYDATE I SUMMARY 9/24/2005 ***CONTINUE WSR FROM 9-23-05*** (secure well) PULL SLIP STOP CATCHER. DRIFT WI BRUSH & 3.80 G-RING TO 13,143' SLM SET PXN PLUG BODY @ 13148' SLM. RAN 4.5" CHECK SET, CAME BACK SHEARED PRONG SET @ 13140' SLM WELL LEFT S/I FLUIDS PUMPED BBLS o o TOTAL 2-18 Cancel waiver ) Subject: Z-18 Cancel \vaiver From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com> Date: Mon, 27 Iun 2005 14:32:02 -0800 To: "Rossberg, R Steven" <RossbeRS@BP.com>, "NSU, ADW Well Operations Supervisor" <NSUADWWellOperationsSupervisor@BP.com>, "Robertson, DanielB (Alaska)" <RobertDB@BP .com>, j im _regg@admin.state.ak.us, winton _ aubert@admin.state.ak:.us" "GPB, GC2 . Area Mgr" <GPBGC2TL@BP.com>, "GPB,Wells Opt Eng" <GPBWellsOptEng@BP.com>, "GPB,' Optimization Engr" <GPBOptimizationEngr@BP.com>, "GPB, GC2 Wellpad Lead'" '"." <GPBGC2W ellpadLead@BP.com>, GPBWellPadsL VZ@BP.com CC: . "Dube, Anna T" <Anna.Dube@BP.cöm>,"NSU ,ADW Well Integrity Engineer" <:NSUADWWel1IntegrityEngineer@BP .com>, "Holt, Ryan P (VECO)" <Ryan.Ho1t@BP.com>, "Mielke, Robert L." <robert.mielke@BP.com> ) Hello all. Well Z-18 has been classified as a Trouble well and the waiver has been canceled. We are planning a rig workover to convert the well to injection. The well will stay shut-in until the workover is complete. Please call with any questions. Joe 1-907 -659-5102 i -0 ~{ '- pìb':t;. ('bCJ -09~ J wW ~ ~^-C-e tù )2004 ''''- " t) f) 20""'t:' SCANNED JUL ~J I~J .." uJ jl'~q 7¡'Q;/{)5' 1 of 1 7/13/2005 9:59 AM MEMORANDUM State of Alaska Alaska Oil and (}as Conservation Commission TO: Julie Heusser Commissioner DATE: January 23, 2001 THRU: FROM: Tom Maunder, P. I. Supervisor Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit Z Pad .Fr. idav, JanuarY. 19,.2_001: I traveled to BPX's Z Pad in the Prudhoe Bay Field and witnessed surface safety valve system testing. Merv Liddelow was the BPX representative in charge of testing. As the attached AOGCC Safety. Valve System Test Report indicates I witnessed the testing of 21 wells and 43 components with 6 failures. The pilot on well Z-03 failed to trip and the pilot on well Z-08 was frozen and once thawed it passed a retest but the SSV on this well had an unacceptable closure time (12-min.), The SSV on well Z-18 also had an unacceptable closure time (15-min.) and the SSV's on wells Z-22B and Z-24 failed to pressure test. The high failure rate on Z Pad requires it be placed on a 90- day test interval. Mr. Liddlow indicated to me today that all failures have been repaired except the slow SSV closure of wells Z-08A and Z-18. The hydraulic lines on these wells need to be flushed and he has arranged for the maintenance crew to perform the work. Wellhouse inspections were conducted on the 21 wells tested with no exceptions noted. .Spmmaw: I witnessed SVS testing at BPX's PBU Z Pad. 21 wells, 43 components, 6 failures. 13.9% failure rate. 21 wellhouse inspections conducted. Attac,, hmep,t,.: SVS PBU Z Pad '1-19-01 JJ Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOCK2C Rep: ,, ,Jeff,J0nes ..... ,, Submitted By: Jeff Jones Field/Unit/Pad: PBF/PBU/Z Pad Date: 1/19/01 Separator psi: LPS 159 HPS Well Permit Separ, Set L/P Test Test Test Date Oil, WAG, GINJ, · Number Number PSI PSI Trip Code Code Code Passed GAS or C¥CL~ i i Z-01 1880660 159 125 125 P P OIL Z-02A 1960430 Z-03 ' ' 1971310, '" i5~'" 125 ....... 0 "' 1 ......... P ...... OIL Z-04 1891230 Z-05 1900780"" i59,! ' 125 '120 'P "~" OIL Z-06 1880320 Z-07A 1931100 Z-08A 1931280 159 125 0 2 43 1/22/01 OIL Z-09 .. 1890850[ ...... . ............... Z-10 1891160 Z-11 1'900720' 159 "i25 '125 i~' ' ' v ' ' ' OIL Z-12 189102O Z-13 ' 1900~40' " i59 " 1'25 125 P P OIL Z-14A 1980510 ,, ...... i ............ z.15 .................... s8osso z-16 '"1~}2612o '159 125 125 P - P ' ' " ........ OIL Z-17 1891390 i59 125~ 125 P P OIL Z-18 1896960''i59 i25i" 120'P '4'3 " ' OIL Z-19 .1920236 .... . ..... z-2o , 8i00o ......................... Z.21 ,, '1890420 .................................. Z-22B 1960350 159 125 125 P 4 OIL Z-23A 1950430 Z'-24' 1890180 '' '159" 125: "f30 ' ~ ' 4 " ' . .. 0IL! Z-25 188'1596 1~9 ' ' '1:~5" ' 125 ' P ..... P ............. OIL 'Z-26 ..... 11890520 ' i59' 125 ...... 1'25' 'i~ "' P ......... 0IL z-27 1900310 159 125 125 P P OIL Z-28 1881270 Z-29 189065b" 'is'6 ' i25 "i20 i'' P ....... OIL Z-30 1900230 159 125 1115 P P OIL z-3 Z-32B 1970340 "159' "' 125 125~ P P OIL Z-33A i890650'-2750 ";~600 2500 'P " P' P ..... GINJ -- z,35' ' '1~8'0950 .... 159' ..... 12~'"i2o" 'i,' P ..... OIL 1/24/01 Page 1 of 2 SVS PBU Z Pad 1-19-01 JJ.xls -' - ' - ....... , ,,, -, ,, ,' , , "r ' - , ...... , ' ~ , ' ' ' ~ ~" ,~ ~'" ~i-,* , ...... Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN& Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE I I I I IIIII I I I ] I I I! II III Z-38 1980600 159 125 120 .P P OILI _ Wells: .... 21 Components: 43 Failures: 6 Failure Rate: 13.9%1~i9o my Remarks: Z-0SA SSV failed: !2 minute..c!0se....Z-.!.$ .SSV .failed: !5 ,,n~,', ute close, fr°zen pilot .... ,t .ha, wed. &_passed retest, ................................... ~ . . ..... 1/24/01 Page 2 of 2 SVS PBU Z Pad 1-19-01 JJ.xls THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE OCTOBER 24, 2000 P M C:LORI~VlFILM.DOC L A TER IA L TH-IS MA E E U R E W N D E R i K E R STATE OF ALASKA ALA;dKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging .. Perforate X Pull tubing Alter casing Repair well Other~ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 984' SNL, 1996' WEL, SEC. 19, T11N, R12E, UPM At top of productive interval 1060'NSL, 2421' EWL, SEC. 29, T1 !N, R12E, UPM At effective depth 677' NSL, 2457' EWL, SEC. 29, T11N, R12E, UPM At total depth 572' NSL, 2472' EWL, SEC. 29, T11N, R12E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) KBE = 91.55 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-18 (24-29-11-12) PBU 9. Permit number/approval number 89-96 / 10. APl number 50- 029-21971 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical 14317 feet BKB 9215 feet Effective depth: measured 14190 feet true vertical BKB 9144 feet Casing Length Size Structural -- Conductor 110 20 Surface 3102 13 3/8 Intermediate 13423 9 5/8 Production -- Liner 1130 Perforation depth: measured Plugs (measured) Junk (measured) test packer parts in bottom of hole Cemented Measured depth True vertical depth BKB 146 146 4460 c.f. 3138 2653 2927 c.f. 13459 8701 5 1/2 483 co f. 13187-14317 13845'- 13928', 13750'- 13770', 13730'- 13750', 13720'- 13730' 8528- 9215 true vertical subsea 8854'-8904' Tubing (size, grade, and measured depth) 3 1/2" L-80 to 13115' with 3 1/2" tailpipe to 13190' Packers and SSSV (type and measured depth) 9 5/8" TlWpacker at 13115'; 7" Otis WD packer w/TP assy. at 13935'; 3 1/2" SSSV at 2099' lr~ ~ t'" C I \ I ~ ~'~ iqLk.,bI v 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure Alsska 0il & Gas Cons. Ccm,mission 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure . . Tubing Pressure Prior to well operation 760 653 342 1950 245 Subsequent to operation 99 -147 192 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run I Daily Report of Well Opera[ions .__ ~ I Oil_X_. Gas__ Suspended__ 17. I heceb'~ c,ef~ that,the foj~going is trt~ arC/correct to the best of my knowledge. Signed,~/ f~,/,~~,~ ~ ,~/~.-t...,z..., Title TechnicalAssistantlll Form 10-404 F~ev 06~15/88' - 1500 227 Service Date-~//~¢¢ SUBMIT IN DUPLICATE WELL Z-18(24-29-11-12) Stimulation Operation 5/10/9 5 A Acid Treatment was performed using the following fluids: SUMMARY Run in hole with 3 1/4" swirl nozzle while pumping filtered sea water. Fluid pack well. Tag bottom at 13918' CTD. Washed out down to 13940' CTD. Rig up BJ. Hold safety meeting and pressure test lines to 4000 psi. Good test. BJ pumped 356 bbls of 5% HCL acid while the nozzle was reciprocated across perfotations from 13720' to 13928' several times. Displace acid from coil and liner with sea water. Over flush acid into formation with 65 bbls sea water. Started to pull out of hole. Freeze protect coil and finish out of hole. Close swab and remove fusible cap. Rig down unit. Leave well shut in for flow-back thru Trico. Notify MOC and Pad Operator. _. FLUIDS PUMPED BBLS .Description 295 356 100 35 SEA WATER (0.2% SURF). 5% HCL SEA WATER (DISP - 0.2% SURF). METHANOL Addperf 5/16/95 The following additional interval were perforated using 3 guns, 6 SPF, random orientation and 60° phasing. 3/8" 6/22/95 BBLS 100 40 340 183 225 13812- 13836MD' Stimulation Operation A Scale Inhibitor Bullhead Acid was following fluids: SUMMARY FLUIDS PUMPED --. .Description performed using the seawater withl00 gal of west scale 46 and NE-41 Surfactant filtered seawater with 50 ppm westscale 46 and NE-41 3.5% ESL 19 (500 gal) solution and activator (55 seawater with NE-41 surfactant. filtered seawater with 50 PPM westscale 46 and NE-41 filtered seawater with NE-41 gal) in filtered LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 11 September 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: I CN/GR FIN~ BL+~ -'-~V':Run "' N-01 (13-08-11-13)--- i CN/GR F~ BL+~ "u:-'~"=-Run- - -. '" . .... B-06 (41-31-11-14) N-03 (23-18-11~13) N-16 (11-17-11-13) W-31 (31-17-11-12) I CN/GR FIN~-'BL+RF-~>;-~}},. Run -- , -,--- ...... ....'... -: ..'" :: ' ........ . -~.:~::_. :._.,,.:-/:_~::: ::7%1~.'?: . ~ C~/GR ~Z~ B%+A~ Au~ ~ Z _.. 49Z2.04 .. .. ._.-- . ...... :-. .... . .. - . -' -.- i CN/GR FIN~ BL+~ . Run ~ I 5659.04 .......... ' ..... . _ 1 PLS FI~ BL+RF Run ~ 1 5779.04 . ...... Z-15 I PLS FINAL BL+RF Run # I 6026.03 N-26 (21-7-11-13) I PFC/PERF FINAL BL+RF Run # I 6245.07 Y-11L1 .. i GR/CCL FINAL BL+RF Run # I 6476.00 \ · · · · . Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 17 July 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION Z-18 1 PLa/STATIC FNL BL+RF 1 PLS/STATIC FNL BL+RF 1 PLS/STATIC FNL BL+RF ECC No. Run # 1 522.07 Run # 1 5779.03 Run # 1 6444.01 Please sign and return to: Attn. ROdney D. P~ Atlas Wirelin~q~~s nchorage, AK 99518 '/~Or FAX ty.~w.Or~ o(907) 563-780 Received b ~ ~ .~: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 11 July 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL A -23 (44-27-11-12) # DESCRIPTION 1 PLS FINAL BL+RF 1 PLS/STP FINAL BL+RF 1 PLS/STATIC FNL BL+RF 1 PLS/STP FINAL BL+RF 1 PLS/STP FINAL BL+RR ECC No. Run # 1 3771.05 Run # 1 5779.02 Run # 1 5992.03 Run # 1 6052.03 Run # 1 6454.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wirelinm .~,=~'vi Anchorage, AK 99518 to (907) 563-7803 Received by: ~ Date: RECEIVED ,. Alaska Oil & %as ¢of~s. ~;ummissioti Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 22 May 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear sir/Madam, Enclosed, please find the data as described below: WELL x-o DESCRIPTION 1 PLS FINAL BL+RF 1 CCL FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF ECC No. Run # 1 3820.05 Run # 1 5638.03 Run # 1 5734.04 Run ~ 1 5779.01 Run # 1 6418.02 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please ~li'.;fn and 2eturn ~o~ Petro~:echnteal Data Cente.~ BP Ex~)lomatfon (Alaska) In~ ?00 Ea~enson Boulevar4 ........ 'Anchorage STATE OF ALASKA -"""' ALASKA OIL AND GAS CONSERVATION COMMISS~oN REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull tubing Alter casing Repair well Other 5. Type of Well: 6. Datum elevation (DF or KBE = 91.55 AMSL~eet I 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 984' SNL, 1996' WEL, SEC. 19, T11N, R12E, UPM At top of productive interval 1060'NSL, 2421' EWL, SEC. 29, T11N, R12E, UPM At effective depth 677' NSL, 2457' EWL, SEC. 29, T11N, R12E, UPM At total depth 572' NSL, 2472' EWL, SEC. 29, T11N, R12E, UPM 12. Present well condition summary Total depth: Effective depth: Development X Exploratory Stratigraphic 7. Unit or Property name Service Prudhoe Bay Unit 8. Well number Z-18 (24-29-11-12) PBU 9. Permit number/approval number 89-96/ 10. APl number 50- 029-21971 11. Field/Pool Prudhoe Oil Pool measured 14317feet Plugs (measured) true vertical BKB 9215feet measured 14190feet Junk (measured) true vertical BKB 9144feet test packer parts in bottom of hole Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth .- 110 20 146 3102 13 3/8 4460 c.f. 3138 13423 9 5/8 2927 c.f. 13459 measured .. 1130 5 1/2 483 c.f. 13187-14317 13845'- 13928', 13750'- 13770', 13730'- 13750', 13720'- 13730' true vertical subsea 8854'-8904' Tubing (size, grade, and measured depth) 3 1/2"L-80 to 13115' with 3 1/2" tailpipe to 13190' True vertical depth BKB 146 2653 8701 M AR 1 5 199 Alaska 0il & Gas Cons, C0mmissi~ Anchorage Packers and SSSV (type and measured depth) 9 5/8" TlWpacker at 13115'; 7" Otis WD packer w/TP assy. at 13935'; 3 1/2" SSSV at 2099' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 940 1062 20 895 3160 4562 67 0 Tubing Pressure 262 326 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby c.ertify that the foregoing is true and correct to the best of my knowledge. , S~gned , ~,~ Title Senior TechnicalAssistant I Form 10-~64 IRev 06/15/88 Date ~'//'~ / c),..~ SUBMIT IN DUPLICATE WELL Z-18(24-29-11-12) PBU HYDRAULIC FRACTURING OPERATIONS 3/28/9 1 Performed hydraulic fracture using the following fluids: Fluids Pumped: 36 71 14 52 55 85 88 9O 92 64 81 24 17 bbls 50# gel prepad to establish rate 6 bbls 50# x-linked gel pad 9 bbls 50# x-linked gel w/ 1 ppg 16/20 carbolite bbls 50# x-linked gel w/ 2 ppg 16/20 carbolite bbls 50# x-linked gel w/ 3 ppg 16/20 carbolite bbls 50# x-linked gel w/ 4 ppg 16/20 carbolite bbls 50# x-linked gel w/ 5 ppg 16/20 carbolite bbls 50# x-linked gel w/ 6 ppg 16/20 carbolite bbls 50# x-linked gel w/ 7 ppg 16/20 carbolite bbls 50# x-linked gel w/ 8 ppg 16/20 carbolite bbls 50# x-linked gel w/ 9 ppg 16/20 carbolite bbls 50# x-linked gel flush 1 bbls 10# gel flush fjh 10/14/92 REEEIVED .4laslm Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 11/23/92 T% 84101 BP CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. G-12 ~/' ~ CCL 11/15/92 #1 R-25 ~Z-~3 CCL 11/17/92 ~1 U-07~/-.-/o'o STATIC ¢ r~ 11/16/92 ~1 Z-18 F~-~(STATIC) ~ 11/17/92 ~1 Z-21~?-~STAT~C) ~ 11/17/92 ~1 9100.00-10468.00 ATLAS 5 " 10100.00-10860.00 ATLAS 5 " 9545.00- 9714.00 ATLAS " 13050.00-13809.00 ATLAS " 10100.00-11082.00 ATLAS " Information Control Well Records RECEIVED DEC ] 8 1992 -';laska Oil & Gas Cons. Commission Anchorage STATE OFALASKA 0 j~ ~ ~ Al~S~ OIL AND GAS CONSERVATION COMMISSIOi~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing X -~. Stimulate X Plugging Perforate Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P: O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 984' SNL, 1996' WEL, SEC. 19, T11N, R12E, UPM At top of productive interval 1060'NSL, 2421' EWL, SEC. 29, T11N, R12E, UPM At effective depth 677' NSL, 2457' EWL, SEC. 29, T11N, R12E, UPM At total depth 572' NSL, 2472' EWL, SEC. 29, T11N, R12E, UPM 5. Type of Well: Development ~X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 91.55 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z- 18 (24-29-11-12) PBU 9. Permit number/approval number 89-96 / 10. APl number 50- 029-21971 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 14317feet Plugs (measured) BKB 9215feet 14190feet Junk (measured) BKB 9144feet test packer parts in bottom of hole Casing Length Size Cemented Measured depth Structural -- Conductor 110 20 146 Surface 3102 13 3/8 4460 c.f. 3138 Intermediate 13423 9 5/8 2927 c.f. 13459 Production -- Liner 1130 5 1/2 483 c.f. 13187-14317 Perforation depth: measured 13845'- 13928' true vertical subsea 8854'-8904' Tubing (size, grade, and measured depth) 4-1/2" L-80 to 13194' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 13146'; 4 1/2" SSSV at 2127' True vertical depth BKB 146 2653 8701 8528-9215 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. ~ Prior to well operation SUbsequent to operation Reoresentative Daily Averaae Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 970 1057 2O 3160 4562 67 Tubing Pressure 275 326 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed . Title Supervisor Workover/Completions Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, December 12. 1990 WELL: Z.18 (24-29-11-12),. Rig: Doyen Rig #16 Day: _.1 Expense AFE Number: Expense AFE Amount = 145040 Current Field Costs = Estimated Final Cost = Current Operation:, Circulate well. Summary of Last 24 Hours Accept dg 2200 hours on 12/11/90. MIRU. Weight up to 8.8 ppg. RU lubricator. Pull BPV. Circulate well I E EIVED Alasl?a.Oil.& Gas Cons. Cornmis$ion ~nchorage. Reviewed By: /~~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: pRIdDHOI~ BAY UNIT As of 0600 Hrs. Tht~r,sday. December 13. 1990 WELL: Z-18 (24-29-11-12) Rig: DQyQn Rig #16 Day: 2 Expense AFE Number: Expense AFE Amount = Current Operation: Summary of Last 24 Hours 14,,5040 Current Field Costs = Estimated Final Cost = Set TWC. ND tree, NU BOP & test, pull TWC. Pull 15 joints 3-1/2" tubing. Circulate out gas. Reviewed By: ~ ~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Friday, December 14. 1990 WELL: .,Z-IS (24-29-11-12') Rig: Doyon Rig #16 Day: .3_ Expense AFE Number: 145040 Expense AFE Amount = Current Operation: RIH with fishing assy. Summary of Last 24 Hours Pull and lay down 3-1/2" tubing. MU fishing tools. RIH. Current Field Costs = Estimated Final Cost = Reviewed By:~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOI~ BAY UNIT As of 0600 Hrs. Monday, December 17. 1990 WELL: Z-18 (24.29-11-12), Rig: Doyon, Rig #16, Day: 6 Expense AFE Number: 145040 Expense AFE Amount = Current Operation: P©H with washover shoe. Summary of Last 72 Hours Current Field Costs = Estimated Final Cost = RIH with overshot, recover 31 joints and wireline fish. RIH. Set storm packer replace 9-5/8" packoff. Recover storm packer. Washover packer. RIH with spear. No recovery. RIH washover shoe. POH. Reviewed By: ~/~~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday, December 18, 1990 WELL: Z-18 (24-29-11-12) Rig: Doyon Rig #16 Day: 7 Expense AFE Number: Expense AFE Amount -- 145040 Current Field Costs = Estimated Final Cost - Current Operation: Replacing packoff. Summary. of Last 24 Hours RIH with spear. Recover packer tailpipe and wireline fish. Replace 9-5/8" packoff. Reviewed By:~~--~-~''~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, December 19. 1990 WELL: Z-18 (24-29-11-12) Rig: ,Doyon Rig ~16 Day: 8 Expense AFE Number: Expense AFE Amount = 145040 Current Field Costs = Estimated Final Cost = .Current Operation: RIH. Summary. of Last ~ Hours RIH. Push junk to 13,841'. Reverse out sand. Mill packer at 13,917'. POH to change out shoe for flat bottom mill. Reviewed By: ~~ BP EXPLORATION (AL'ASKA), INC. DAILY WORKOVER REPORT: ]?RI, IDHQE BAY UNIT As of 0600 Hrs. Thursday,.. December 20. 1990 WELL: Z-18 (24-29-11-12) Rig: Doyon Rig #16 Day' 9 Expense AFE Number: Expense AFE Amount = 145040 Current Field Costs = Estimated Final Cost = .Current Operation' RIH with overshot. Summary. of Last 24 Hours POH. Left 1.5' shoe in hole. RIH with mill. Stuck mill. Parted collars. RIH with overshot. Reviewed By.~~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: ,P, RUDHOE BAY UNIT As of 0600 Hrs. Friday, December 21, 1990 WELL: Z-18 (24-29-11-12) Rig: D. oyon. Rig #16 Day: 10 Expense AFE Number: Expense AFE Amount --- 145040 Current Field Costs = Estimated Final Cost = Current Operation: RIH with mill. Summary of Last 2~4 Hours RIH. Recover collars and packer mill. POH. RIH with mill. ReViewe~ BY'~~'~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday. December 26. 1990 WELL: Z-18 (24-29-11-12), Rig: Doyon Rig #16 Day: 1 5 Expense AFE Number: Expense AFE Amount = .145040 Current Field Costs - Estimated Final Cost - Current, Operation: RIH. Summary of Last 120 Hours Mill on packer to 13,937'. POH. RIH with spear. POH, no fish. RIH, tag fish at 13,160' and push to 13,363'. POH, left 21 DC's in hole. RIH, recover DC's. RIH, tag fish 13,363' and push to 13,942'. POH, no fish. RIH with spear. POH, no fish. RIH. Mill. Twist off. Top of fish at 13,184'. RIH wih overshot, recovered fish. RIH with taper tap. Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRI~DHOE BAY UNIT As of 0600 Hrs. Thursday. December 27, 1990 WELL: Z-18 (24-29-11-12) Rig: Doyon Rig Cf16 Day: 1 6 Expense AFE Number: Expense AFE Amount - Current Operation: POH. Summary. of Last 24 Hours 145040 Current Field Costs = Estimated Final Cost = RIH. Tapered top. Attempt to enter fish. Reverse circulate. POH. RIH with spear. POH. Reviewed BY: ¢..~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Friday, December 28. 1990 WELL: Z-,18 ,,(24-29-11-12), Rig: .Doyon Rig #16 Day: 1 7. Expense AFE Number: Expense AFE Amount = 145040 Current Operation: Summary. of L~,st POH - no fish. POH with mill. 24 Hours Current Field Costs = Estimated Final Cost = RIH with bullnose mill. Wash/ream to top of fish at 13,438' plus 5' over top of fish. Reviewed By' ~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday. December 31, 1990 WELL: Z-18 (24-29-11-12) Rig: Doyon Rig #16 Day: 20, Expense AFE Number: Expense AFE Amount = 145040 Current Field Costs = Estimated Final Cost = ._ Current.Operation: POH with motor. Summary. of Last 72 Hours RIH with spear. Push fish to 13,945'. POH. RIH with mill. Tag fish 13,888'. POH. Twisted off in 3-1/8" collars. RIH & recover collar & mill. RIH with mill & motor. Tag fish 13,908'. Mill & push fish to 13,923', POH. Reviewed By.~--- BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, January 2, 1991 WELL: Z-18 (24-29-11-12) Rig: Doyon Rig #16 Day: 22. Expense AFE Number: Expense AFE Amount = .... _145040 Current Field Costs = Estimated Final Cost = ..C.urrent Operation: POH with PRT. Summa.ry of Last 48 Hours RIH with motor. Mill to 13,928'. RIH tapered tap. POH, no fish. RIH with PRT. Work into fish to 13,930'. POH slow dragging. Reviewed By:(~~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: pRIJDHOE BAY UNIT As of 0600 Hrs. Thursday, Jamjary 3, 1991. WELL: Z-18 (24-29-11-12) Rig: D.oyon ,Rig #16 Day: 23 Expense AFE Number: Expense AFE Amount - 145040 Current Field Costs - Estimated Final Cost = Current Operation: RIH with mill. Summary_ of Last 24 Hours POH with PRT. No fish. RIH with spear. Tag fish at 13,916' and push to 13,930'. Circulate. POH, no fish. RIH with mill. Reviewed By:~¢'~_.~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: As of 0600 Hrs. Friday, January_ 4. 1991 WELL: Z-18 (24-29-11-12), PRUDHOE BAY UNIT Rig- .Doyon Rig #16 Day: 24 Expense AFE Number: ExpenSe AFE Amount = .145O4O Current Field Costs = Estimated Final Cost = ..Current Operation: RIH with RTTS. $~mm~ry of Last 24 Hours RIH tag and jar down @ 13,929'. RIH 8-1/2" bit and scraper. Reverse circulate at liner top. RIH with 5-1/2" test packer. Reviewed By:~~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: As of 0600 Hrs. Monday. January_ 7. 1991 WELL: ..Z-15 (24-29-11-12~ PRUDHOE BAY UNIT Rig: Dgyon Rig #16 Day: 27 Expense AFE Number: Expense AFE Amount = Current Operation: POH with tubing. Summary of Last 72 Hours - j45o4o Current Field Costs = Estimated Final Cost = RIH with RTTS. Tested 9-5/8" casing and 5-1/2" liner lap to 3000 psi, ok. Ran 8.5 gauge ring to 9560' tight. Ran 8.25 gauge ring to liner top at 13,186'. Ran tubing to 11,514'. Packer hung up. Set packer. POH with tubing. Reviewed By: ~~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday. January 8. 1991 WELL: ,Z-!I~ (24-29-11-12) Rig: Doyon Rig #16 · Day: 28 Expense AFE Number: Expense AFE Amount = 145040 Current Field Costs = Estimated Final Cost = Current Operation' POH with packer mill. Summary of Last 24 Hours Pull 4.5" tubing. Mill and push packer to liner top at 13,129'. POH. Reviewed By: ~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRI. IDHOE BAY UNIT As of 0600 Hrs. Wednesday, January 9, 1991 WELL: Z-18 (24-29-11-12), Rig: Doyon Rig #16 Day: 29 Expense AFE Number: Expense AFE Amount = 145040 Current Field Costs = Estimated Final Cost = Current Operation' Ream out packer setting area. Summary of Last 24 Hours . L/D packer mill. RIH, fish packer at 13,128'. L/D packer and tailpipe assembly. RIH w/taper mill, ream tight spot at 2681'. Ream through 400' area where packer set. .- Reviewed By: ~--~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, January_ 10. 1991 WELL: Z-18 ,, (24-29-11-12) Rig: Doy0n Rig #16 Day: 30 Expense AFE Number: Expense AFE Amount -- 145040 Current Field Costs = Estimated Final Cost = Current Operation: RIH w/4-3/4" mill. Summary_ of Last 24. Hours Ream 11,142' to 11,666', dress liner top. polish liner top. POOH. Ream tight spot 9350' to 9551'. RIH with polish mill and Reviewed By: ~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: As of 0600 Hrs. Friday. da, nue, ry 11, !991 WELL: Z-18,, (24,~29-11-12) PRUDHOE BAY UNIT Rig: Doyon Rig #16 Day: 31 Expense AFE Number: Expense AFE Amount = 145040 Current Field Costs = Estimated Final Cost = Current Operation: Run 8.5" gauge ring. Summary_ of Last ~ Hours RIH, ream through liner to PBTD. Ream liner top and tieback sleeve. Reverse circulate 1 hole volume. Pump "Dirt Magnet" followed by 8.8 ppg filtered brine. POOH, L/D drill pipe. · Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRI. IDHOE BAY UNIT As of 0600 Hrs. Monday, January_ 14. 1991 WELL: Z-18,, (24-29-11-12'), Rig: ,D, oyon Rig #16 Day: 34 Expense AFE Number: 145040_ Current Field Costs = Expense AFE Amount = Estimated Final Cost = ..Cur,r. ent,Operation: Rig released at 1800 hours on 1/13/91. ~mm~ry of Last 48 Hour8 Ran 8-1/2" gauge ring to liner top. Run 4-1/2" tubing. ND BOP. NU and test tree. Required 5 attempts to set plug. Set packer. Freeze protected well. Released rig at 1800 hours on 1/13/91. Reviewed By :~~'" ,'~""~ STATE OF ALASKA ~"~ 0 ~ Al- A OIL AND GAS CONSERVATION COMMIS~ ~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 984' SNL, 1996' WEL, SEC. 19, T11N, R12E, UPM At top of productive interval 1060'NSL, 2421' EWL, SEC. 29, T11N, R12E, UPM At effective depth 677' NSL, 2457' EWL, SEC. 29, T11N, R12E, UPM At total depth 572' NSL, 2472' EWL, SEC. 29, T11N, R12E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Stimulate × Plugging Alter casing Repair well 5. Type of Well: Development 3( Exploratory Stratigraphlc Service 14317feet Plugs (measured) BKB 9215feet 14190feet Junk (measured) BKB 9144feet Perforate x Other 6. Datum elevation (DF or KB) KBE. 91.55 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-18 (24-29-11-12) PBU 9. Permit number/approval number 89-96/ 10. APl number 50- 029-21971 11. Field/Pool Prudhoe Oil Pool test packer parts in bottom of hole Casing Length Size Structural -- Conductor 110 20 Su dace 3102 13 3/8 · Intermediate 13423 95/8 Production -- Liner 1130 Perforation depth: measured Cemented Measured depth True vertical depth BKB 146 146 3138 2653 13459 8701 4460 c.f. 2927 c.f. 5 1/2 483 c.f. 13187-14317 13845'. 13928', 13750'- 13770', 13730'- 13750', 13720'- 13730' 8528-9215 true vertical subsea 8854'-8904' Tubing (size, grade, and measured depth) 3 1/2" L-80 to 13115' with 3 1/2" tailpipe to 13190' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary 14. 9 5/8" TIWpacker at,13115'; 7" Otis WD packer w/TP assy. at 13935'; 3 1/2" SSSVat 2099 Intervals treated (measured) Treatment description including volumes used and final pressure Re.oresentative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl APR Alaska OiJ & Gas Cons. C~rnmis Anchorage Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 750 363 0 1077 940 1062 20 895 I 16. Status of well classification as: Oil X Gas Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~-~-~~> Title Form 10-404 Rev 06/15/88 252 262 Service Supervisor Peripheral & EOA Date r..{/,t/,~/ SUBMIT IN DUPLICATE WELL Z-18 (24.29-11-12~ PBU STIMULATION/ADD-PERFS Abullhead HCI tubing wash was performed on February 15, 1990, this was followed on February 18, 1990 by a BOHCI perf breakdown: Pump summary as follows: 24 Bbls diesel/W U-66 @ 6 BPM @ 2000# 12 Bbls 10% HCI w/10% Xylene @ 8 BPM@ 3870# 107 BBls 10% HC1 w/10% Xylene W/450 1.1 SG &/8 RCN ball sealers @ 7BPM, 4130 # WHP, 2000# OAP. 131 BBls NH4CL @ 8.5 BPM, 4100g WHP, 2000 OAP. 24 BBls diesel flush @ 8.5 BPM, 4100# WHP, 2000# OAP. Very little ball action seen. A BOMA was performed on February 21, 1990 followed by a bullhead scale inhibitor on February 28, 1990. Additional perfs were added on February 13, 1991 for the following intervals: 13750' - 13770' MD BKB 13730' - 13750' MD BKB 13720' - 13730' MD BKB The add perfs were done in preperation for a Hydraulic frac. mtp 03/25/91 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :04/17/91 T#:82316 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. E-02 H-17 Y-06 CL 03/06/91 #1 9700-9950 HLS 5" Per/ 02/16/91 #1 10200-10620 HLS 5" CL 02/26/91 #1 9800-10030 HLS 5" Perf 02/13/91 #1 13590-13781 HLS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :04/05/91 T#:82273 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. M-18 Prod -F/Temp 03/22/91 #1 · 8900-935 Camco 5" Z-09 Leak Der 03/22/91 #1 2000-10100 Camco 5" Z-18 CCL 03/20/91 #1 13000-13806 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED APR 8 1991 Alaska Oil & ~as Cons. commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519.6612 (907) 561-5111 TO: DISTRIBUTION Date:03/28/91 T#:82256 FROM: SUBJECT: Information Control Well Records LR2-1 B.P CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-17 B-10 C-12 C-21 D-24 F-18 G-31 H-16 -09 Q-02 Q-03 Q-06 ~ ~ ~'..--Z-18 Inj 03/17/91 #1 9900-10800 Camco 5" Gas Entry 03/10/91 #1 10200-10527 Camco 5" Prod-F 03/11/91 #1 11500-11448 Camco 5" Temp 03/18/91 #1 8900-9163 Camco 5" Temp 03/18/91 #1 10700-10930 Camco 5" Leak Det. 02/19/91 #1 0-11438 Camco 5" PITS 03/08/91 #1 8900-9200 Camco 5" Gas Entry 03/09/91 #1 1900-10037 Camco 5" Tie In CCL 03/19/91 #1 8100-9350 Camco 5" Prod-F 03/08/91 # 1 8850-9350 Camco 5" Pmd-F 03/07/91 # 1 8850-9350 Camco 5" Prod-F 03/07/91 #1 11050-11350 Camco 5" CCL 03/15/91 #1 13081-13929 Camco 5" Leak Der. 03/16/91 # 1 400-10250 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED APR 1 Alaska 0il & Gas C~ns. 150mlnJssiol Anchorage TO: THRU: MEMORANDUM State of Alaska ALASK~,/~,OIL AND GAS CONSERVATION COMMISSION /x,,.' Lonnie C. Sm~:~ DATE: February 13, Commiss ione~ FILE NO: LG213 1991 TELEPHONE NO: SUBJECT: RIG/BOPE Inspection BPX PBU Z-18 Prudhoe Oil Pool FROM: Louis R. Grimaldi i~-!~-~ Petroleum Inspector Wednesday. 1/9191: I performed a RIG/BOPE inspection on Doyon #16 working on Z-18 for BPX. The rig was in very good shape and the only problem I could find was that the gas detector for the rig floor was indicating a malfunction. The toolpusher was aware of this and explained to me that he had another sensor enroute and would install it as soon as it arrived. Their last BOP test was on 1/3/91. In summary: Doyon I6 is a very good looking and well maintained rig and appears to be in good shape for drilling. Note: Gas detectors were fully operational on Jan. 13, 1991 as per telecon with Jim Willingham, Doyon toolpusher. 02-00lA (Rev. 6/89) 20/ll/MEMO1.PM3 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 29, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well Z-18 (24-29-11-12) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAM: JAM Enclosures (~) cc: L. Burke (MB12-1) Well File And'mra~ STATE OF ALASKA ~'~ ~. .$KA OIL AND GAS CONSERVATION COMM,. ,ON ~ ~ APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend .. . Alter casing Repair well_ Change approved program ' 2. Name 'of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface Operation Shutdown Re-enter suspended well~ Plugging _ Time extension ~ Stimulate x~ Pull tubing ~ Variance ~ Perforate ~ Other 5. Type of Well: Development x Exploratory ~ Stratigraphic Service 984' SNL, 1996' WEL, SEC. 19, T11N, R12E, UPM At top of productive interval I060'NSL, 2421' EWL, SEC. 29, T11N, R12E, UPM At effective depth 677' NSL, 2457' EWL, SEC. 29, T11N, R12E, UPM At total depth 572'NSL, 2472' EWL, SEC. 29, T11N, R12E, UPM 12. Present well condition summary Total depth: measured 14317 feet true vertical BKB 9215 feet Plugs (measured) 6. Datum elevation (DF or KB) KBE = 91.55 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-18 (24-29-11-12) PBU 9. Permit number 89-96 10. APl number 50- 029-21971 11. Field/Pool Prudhoe 0il Pool Effective depth: measured 14190 feet true vertical BKB 9144 feet Junk (measured) test packer parts in bottom of hole Casing Length Size Cemented Measured depth Structural -- Conductor 110 20 146 Surface 3102 13 3/8 4460 c.f. 3138 Intermediate 13423 9 5/8 2927 c.f. 13459 Production -- Liner 1130 5 1/2 483 c.f. 13187-14317 Perforation depth: measured 13845'. 13928' true vertical subsea 8854'-8904' Tubing (size, grade, and measured depth) 3 1/2"L-80 to 13115' with 3 1/2" tailpipe to 13190' True vertical depth BKB 146 2653 8701 Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 13115'; 7" Otis WD packer w/TP assy. at 13935'; 3 1/2" SSSV at 2099' 13. Attachments Description summary of proposal January/February 1990 14. Estimated date for commencing operation Ill 16. If proposal was verbally approved Name of approver Date approved Detailed operations program Oil X Service BOP sketch 15. Status of well classification as: Gas ~ Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed (~/~.~~//4~:~'~) Title Mana~ler Production En~tineerin~l Date/' //' co ss o, use O.LV Cond,itig~s of approVal: Notify Commission so representative may witness I Approval No. ~/~ _/'3 v Plug integrity BOP Test Location clearance ..... .~ ~' "."',,¢---~ Mechanical Integrity Test_. Subsequent form required_ 10- ~.c, ~ ~pg_ro,~ec.!.,~O2~Y._~tu~ Original Signed By ~e~ ~ .. ~,L~ David W. johnston ~ Date -~.¢~-/ - Approved by order of the Commission Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE WELL Z-18 (24-29-11-12~ PBU STIMULATION PROPOSAL A HCI breakdown/mud acid treatment followed by a contingent scale inhibition treatment is proposed for the following perforated interval in Well Z-18. 13845' - 13928' MD BKB The acid wash will preceded by a tubing wash. The bailout will be bullheaded as follows with diversion being accomplished with 450 1.1 SG 7/8" rubber-coated nylon ballsealers. a) b) c) d) e) 1000 gal. Arctic diesel preflush 500 gal. 10% HCI 4500 gal. 10% HC1 with 450 ballsealers dropped evenly throughout the fluid 5500 gal. 2% NH4C1 brine 1000 gal. diesel The well will be surged three times to knock the ballsealers off the perforations. Pump the following mud acid treatment: a) b) c) d) e) f) g) h) i) j) k) l) 1000 gal. 6% HC1/1.5% HF 250 gal. OSR divener 2500 gal. 6% HC1/1.5% HF 250 gal. OSR diverter 4000 gal. 6% HCI/1.5% HF 250 gal. OSR diverter 5000 gal. 6% HC1/1.5% HF 15000 gal. 2% NH4C1 brine 2000 gal. Arctic diesel post-flush 1000 gal. xylene 1000 gal. diesel spacer Displace to peffs with 106 bbls. dead crude The well will then be returned to production and tested. Depending on the results of the above treatments, the following scale inhibition treatment ~will be bullheaded: a) b) c) d) e) f) g) 30 bbls. Arctic diesel preflush w/mutual solvent 20 bbls. methanol 40 bbls. EDTA w/OSR 120 bbls. scale inhibitor 415 bbls. seawater overflush 60 bbls. diesel w/25% xylene Displace from coiled tubing w/dead crude The well will be left shut in for two hours, then returned to production and tested. jm 1/25/90 BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 12/28/89 Transmittal: 80747 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material questions, please contact BP Well Records C-01 PROD-F 12/~/89 #1 M-28I INJ 12/18/89 #1 N-20 PROD-F 12/15/89 #1 R-05 INJ 12/16/89 #1 R-15 PROD-F 12/14/89 #1 Z-18 PROD-F 12/19/89 #1 listed below. If you at (907) 564-4445. 8800-9070 Camco 8700-8940 Camco 9800-10132 Camco 8900-9510 Camco 8900-9292 Camco 13750-14051 Camco have 5W 5" 5' 5" 5" 5" any Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RES ER~¥~I_R ~ ~~_ _O F ALASKA~ ARCHIVES RECEIVED JAN - 2 ~oo,~ Alaska 0il ;!I; Gas Cons. Commlss~ Anchorage RECEIVED JAN -2 lqqo Alaska Oil & Gas Cons. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: HOUSTON ARCO CHEVRON EXXON TExAco MOBIL PHILLIPS ARCHIVES DATE: 12/14/89 T#: 80695 BP FINAL DATA - PRESSURE SURVEY DATA Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. F-34 BHP Pressure Report 11/24/89 Camco F-37 BHP Pressure Report 11/24/89 Camco Z-12 BHP Pressure Report 11/26/$9 Camco Z-18 BHP Pressure Report 11/26/89 Camco RE ED DEC281989 AlaSka Oil & Gas Cons. Commiss'to~ Anchorage Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: HOUSTON ARCO CHEVRON EXXON MOBIL GEOSCIENCES ARCHIVES DATE: 10/04/89 T#: 80440 BP OPEN HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. HOU/UNIT/STATE: Z-18 BHCA 10/01/89 91 13451-14290 Atlas 2'/5" Z-18 CN-GR 10/01/89 91 10100-14262 Atlas 2"/5' Z-18 DIFL 10/01/89 #1 13451-14318 Atlas 2'/5" HOU/GEOS/ARCO/EXXON/ARCHIVES ONLY .... Z-18 SS TVD 10/01/89 91 Atlas STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Survey Date: Job#: Job#: Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION November 30, 1989 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton Well Z-18 (24-29-11-12) Enclosed, in duplicate, is form 10-407, our Report of Well Completion for the above named well. This information reflects the current condition and status of the well. Enclosed are two copies each of daily drilling reports, directional and gyroscopic surveys, and open hole logs. Yours very truly, G. W. Kirton PBU Lead Engineer GWK/KTH Enclosures (4) J. Martin (MB 9-4) Well Records w/lO Well File STATE OF ALASKA ALASK^ ~IL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE'il 21 Name of Operator 7. Permit Number BP Exploration 89-96 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21971 4. LOcation of well at surface 9. Unit or Lease Name 984'SNL, 1996' WEL, SEC 19, T11N, R12E Prudhoe Bay Unit ................. 10. Well Number At Top Producing Interval i. OC,~i'!ONS Z-18 (24-29-11-12) 4221 'SNL, 2858' WEL, SEC 29, T11N, R12E 11. Field and Pool VE~IED At Total Depth ~.. r~ ..~~~~ Prudhoe Bay F,e/d/Prudh oe Bay Pool 4709' SNL, 2806' WEL, SEC 29, T11N, R12E 5.'Elevation in feet (indicate KB, DF. etc.) 16. Lease Designation and Serial N~. KBE = 91.55' I ADL 47453 12'. Date Spudded' 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 9-8-89 10-01-89 10-10-89I N/A feet MSL I ONE 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD', 19. Directional Survey 120. Depth' where SSSV set 121. Thickness of Permafrost I 14317'MD/9215'TVD 14190'MD/9144'TVD YES [] NO ii 2099 feet MD I 1892' ,, 22. Type Electric or Other Logs Run DIL/BHC/GR/CNL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ,, 20" Cond Surface 110' 13-3/8" 68# L-80 Surface 3138' 17-1/2" 4460 cufl Permafrost 9-5/8" 47# L-80 Surface 13459' 12-1/4" 2927 cu ft Class G 5-1/2" 17# L-80 13187' 14317' 8-1/2" 483 cufl Class G ,, 5~4. Periorations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SETIMD} PACKER SET IMD) Schlumberger 3-3/8" @ 4spf 3-1/2" 9.2#L-80 13190' 13115' MD TVDss ..... 13845'- 13928' 8854'-8904' ~6. ACID, FRACTURE. CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 13-3/8"X9-5/8' Freeze Protect Annulus w/175 bbls Dry Crude 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) October 7, 1989 I F/owing date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED..~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ;P'~. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. Note: Verbal approval was given by Mike Minder of AOGCC to run 5-1/2" liner on 10-3-89. ~ E E E ! V E D i"ii:',',, 0 ~ 19~.,~ , . . Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. GEOLOGIC MARKERS ...,RMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. ~'ag ..... 13473' 8710' Shub/ik A 13508' 8733' Zone 4 13714° 8865' 31. LIST OF ATTACHMENTS 32, I hereby certify that the foregoing is true and correct to the best of my knowledge Signed . .~t"~ ~ TitlePBULeadEno_ino¢r Date //'~"///(~¢ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-s~tu combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION Daily Drilling Report -- Prudhoe Bay Unit September 8, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 324' Day: 0 24- Hour Ftg: 324' Current Operation: Drilling 17-1/2" hole. Rig up. Spud well at 0145 hr. and drilled 17-1/2" hole. Accepted rig 1800 hrs. 9-7-89. Wells Shut-In for Drill-By: Z-20 Mud Type: SPUD WT: 9.5 SURVEY MD ANGLE VIS: 150 PV: 17 YP: 30 FL: 16 Solids: 5.5 Temp: DIRE~'TIQN TVD SECTION COORDINATES 56°F DL$ BP EXFI. ORK[iON Daily Drilling Report-- Prudhoe Bay Unit September 11, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 2623' Day: 3 72- Hour Ftg: 2623' Current Operation: Motor run. Drilled 17-1/2" hole to 2623'. Wells Shut-In for Drill-By: Z-20 Mud Type: SPUD WT: 10.0 VIS: 62 PV: 17 SURVEy MD ANGLE DIRECTION TVD YP: 19 FL: 14 SECTION Solids: 10 Temp: 72 °F COORDINATES DL$ Daily Drilling Report-- Prudhoe Bay Unit September 12, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 3160' Day: 4 24- Hour Ftg: 537' Current Operation: RD casing tools. Drilled 17-1/2" hole to 3160'. Ran 13-3/8" casing and cemented. ND 20" diverter. Wells Shut-In for Drill-By: Z-20 Mud Type: SPUD WT: 10.2 VIS:110 PV:26 YP:40 FL: 11 SURVEY MD ANGLE D1RE(;'TIQN TVD SECTION Solids: 11.5 Temp: .COORDINATES 68 °F DLS EIP Daily Drilling Report -- Prudhoe Bay Unit September 13, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 APl: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 3200' Day: 5 24- Hour Ftg: 40' Current Operation: Drilling 12-1/4" hole. Test BOP's. Test casing to 3000 psi. Drill out 13-3/8" casing. Drilled 12-1/4" hole to 3200'. Wells Shut-In for Drill-By: Z-20 Mud Type: NON DISP WT: 9.55 VIS: 39 PV: 7 YP: 15 FL: 13 SURVEY ,MD, ANGLE DmECT, IQN TVD SE~q'ION Solids: 8.5 Temp: COORDINATES 66 ~F DLS BP EXPLORATION Daily Drilling Report -- Prudhoe Bay Unit September 14, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 4877' Day: 6 24- Hour Ftg: 1677' Current Operation: Drilling 12-1/4" hole. Drilled 12-I/4" hole to 4877'. Wells Shut-In for Drill-By: Z-20 Mud Type: NON DISP WT: 9.6 SURVEY .MD ANGLE VIS:36 PV:9 DIRE~I'IQN. YP: 9 FL: 12 SECTION Solids: 8.5 Temp: 68 °F COORDINATES DLS Daily Drilling Report-- Prudhoe Bay Unit September 15, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 6549' Day: 7 24- Hour Ftg: 1672' Current Operation: Drilling 12-1/4" hole. Drilled 12-1/4" hole to 6549'. Wells Shut-In for Drill-By: Z-20 Mud Type: NON DISP WT: 9.8 SURVEY .MD ANGLE VIS: 38 PV: 10 DIRECTION TVD YP: 7 FL: 8.4 SECTION Solids: 9 Temp: 70 °F COORDINATES DL$, BP EXPLORATION Daily Drilling Report -- Prudhoe Bay Unit September 18, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 9132' Day: 10 72- Hour Ftg: 2583' Current Operation: Drilling i2-1/4" hole with motor. Drilled 12-1/4" hole to 9132'. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 10.0 VIS: 40 PV: 15 YP: 9 FL: 3 SURVEY MD ANGLE DIRECTION TVD SECTION Solids: 9 Temp: COORDINATES 85oF DLS BP EXPLORN'iON Daily Drilling Report -- Prudhoe Bay Unit September 19, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 9607' Day:. 11 24- Hour Ftg: 475' Current Operation: Drilling 12-1/4" hole. Drilled 12-1/4" hole to 9607'. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 10.0 VIS: 44 PV: 14 YP: 9 FL: 4.2 SURVEY ~, ANQLE DIREr'ION TVD, SECTION Solids: 9 Temp: 70 °F COORDINATES DLS. BP EXPLOR.a:i'ION Daily Drilling Report-- Prudhoe Bay Unit September 20, 1989 at 0600 hrs Rig: Audi #2 Well: Z-lg (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 10379' Day: 12 24- Hour Ftg:. 772' Current Operation: Drilling 12' 1/4" hole. Drilled 12-1/4" hole to 10379'. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 10.3 ,MD ANGLE VIS: 41 PV: 14 YP: 10 FL: 4.0 DIRECTION TVD SECTION Solids: 12 Temp: 78 °F COORDINA .TE,~. DL~ BP EXPLOR~N Daily Drilling Report -- Prudhoe Bay Unit September 21, 1989 at 0600 hrs Rig: Audi #2 W¢iI: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 10941' Day: 13 24- HourFtg: 562' Current Operation: Drilling 12-1/4" hole. Drilled 12-1/4" hole with surveys to 10623'. Tested BOP. Drilled 12-1/4" hole with surveys to 10941'. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 10.5 SURVEY MD ANQLE 112 10856 53 VIS:46 PV: 17 YP:9 FL:4.4 Solids: 13.5 Temp: 80°F DIRECTION TVI), ~ECTION COORDINATES D.L$ S15.7E 7097 7453 S6245 E4153 1.6 BP EXPLOR~N Daily Drilling Report -- Prudhoe Bay Unit September 22, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 11408' Day: 14 24- Hour Ftg: 467' Current Operation: Drilling 12-1/4" hole. Drilled 12-1/4" hole with surveys to 11408'. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 10.4 VIS: 45 PV: 15 SURVEY .MD. ANGLE DIRECTION 116 11227 51.3 S13.2E TVD 7325 YP:9 FL:4.6 SECTION 7739 Solids: 13 Temp: 74 °F COQRDINATE$ DL$ S6529 E4227 .9 BP EXPLOR,~N Daily Drilling Report -- Prudhoe Bay Unit September 25, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 APE 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 12522' Day:. 17 72- Hour Ftg: 1114' Current Operation: Drilling 12-1/4" hole. Drilled 12-14" hole with surveys to 12403'. Picked up motor and drilled 12-1/4" hole to 12522'. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 10.4 SURVEY .MD ANGLE 124 11947 51.8 128 12321 53.5 VIS: 39 PV: 13 DIRE~ON,, S9E S6.6E 7766 7993 YP: 8 FL: 4.6 SECTION 8284 8569 Solids: 13 Temp: 80 °F COORDINATES DL$ S7088 W4331 .1 S7383 E4373 1.3 Daily Drilling Report-- Prudhoe Bay Unit September 26, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 APE 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 12878' Day: 18 24- Hour Ftg: 356' Current OperatiOn: Drilling 12-1/4" hole. Laid down mud motor. R/H and drilled 12-1/4" hole with surveys to 12878'. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 10.5 VIS: 39 PV: 13 YP: 9 FL: 4.2 SURVEY ,MD. ANGLE DIRE~'TIQN .TVD SECTION 131 12665 51.9 Sll.SE 8201 8827 Solids: 13 Temp: 80 °F COORDINATES DLS N7652 E4421 1.2 BP I~PI. OR.~ION Daily Drilling Report -- Prudhoe Bay Unit September 27, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 13466' Day: 19 24- Hour Ftg:' 588' Current Operation: Short tripping. Drilled to 13466'. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 10.5 SURVEY MD. ANGLE VIS: 42 PV: 15 YP: 9 FL: 4.4 DIRECTION TVD SECTION Solids: 12.7 Temp: COORDINATES 99°F DL~, Bi~ EXPLORJ~'ION Daily Drilling Report-- Prudhoe Bay Unit September 28, 1989 at 0600 hrs Rig: Audi #2 Well: Z- 18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 13466' Day: 20 24- Hour Ftg:' 0 Current Operation: Running 9-5/8" casing. POOH. Ran 9-5/8" casing. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 10.5 SURVEy MD ANGLE VIS: 40 PV: 15 DIREr'ION TVD YP: 9 FL: 4.2 SECTION Solids: 13 Temp: 90 °F COORDINATES DLS BP EXPLORATION Daily Drilling Report .. Prudhoe Bay Unit September 29, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 13466' - Day:. 21 24- Hour Ftg: 0 Current Operation: RIH with DP. Ran 9-5/8" casing and cemented. RIH with DP. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 9.5 SURVEY MD ANQLE VIS:35 PV:6 YP:2 FL:- DIRECTION TVD SECTION Solids: 9 Temp: - °F COORDINATES DL~ BP ~(PLOR~N Rig: Audi #2 Well: Z-18 (24-29-11-12) Daily Drilling Report -- Prudhoe Bay Unit October 2, 1989 at 0600 hrs AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: Current Operation: 0600 Depth: 14317' Day: 24' 72- Hour Ftg: 651' Circulate bottoms up. Drilled 8-1/2" hole to 14317'. Run logs. Circulating. Wells Shut-In for Drill-By: Mud Type: NON DISP WT: 9.5 SURVEY MD,, ANGLE VIS: 36 PV: 9 YP: 7 FL: 6 DIRECTION TV~ SECTION Solids: 8 Temp: COORDINATES DLS BP EX]R.OR~N Daily Drilling Report -- Prudhoe Bay Unit October 3, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) · AFE # 125040 API: 50-029-2197 AFE Amount: Current Amount: 0600 Depth: 14317 Day: 25 24- Hour Ftg:' 0 Current Operation: Pull out of hole with running tool.. Ran and cemented 5-1/2" liner. Bumped plug and set liner. Wells Shut-In for Dr/II-By: Mud Type: Non Disp WT: 9.5 SURVEY MD ANGLE VIS: 37 PV: 9 YP: 6 FL: 6.2 DIRECTION TVD ~,E~YION Solids: 8 Temp: 82 °F COORDINATES DLS BP EXPLORATION Daily Drilling Report -- Prudhoe Bay Unit October 4, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 14317' · Day: 26 24- Hour Ftg:· 0 Current Operation: Pick-up 2-7/8" drillpipe to clean out inside liner. Cleaned out to top of liner. Wells Shut-In for Drill-By: Mud Type: NOPN DISP WT: 9.5 ~I. YRVEY MD, ANGLE VIS: 38 PV: 10 DIRE~'TIQN, TVD YP: 5 FL: 14.0 s,E ,eTlON. Solids:- Temp: - °F COORDINATES. DLS BP EXPLOR~N Daily Drilling Report -- Prudhoe Bay Unit October 5, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 14190' Day:' 27 24- Hour Ftg: ' 0 Current Operation: Displace with 9.2# brine water. C/O liner. Test liner lap to 3000g. Test liner to 3000g - OK. Wells Shut-In for Drill-By: Mud Type: DISPERSED WT: 9.5 SURVEY MD ANGLE VIS: 39 PV: 8 YP: 4 FL: 12 DIRECTION. TVD SE(TFIQN Solids: 8 Temp: 74 °F C, OORDINATE$ D.LS !~ I~O~,ORATiON Rig: Audi #2 Well: Z-18 (24-29-11-12) Daily Drilling Report -- Prudhoe Bay Unit October 6, 1989 at 0600 hrs AFE # 125040 APl: 50-029-21971 AFE Amount: Current Amount: Current Operation: 0600 Depth: 14190' Day: 28 24- Hour Ftg:' 0 Running cement bond logs. Displace well with 9.2# brine. Rig up logging company run CET, CBT, GR and CCL. Wells Shut-In for Drill-By: Mud Type: BRINE WT: 9.2 SURVEY ...MD. ANGLE VIS:- PV: - YP: - FL: - DIRECTION TVD, SECTION Solids: - Temp: COORDINATES 60°F DL~ BP EXPLORgI'ION Daily Drilling Report -- Prudhoe Bay Unit October 9, 1989 at 0600 hfs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 14190' Day: 31 72- Hour Ftg: 0 Current Operation: POH and laying down drillpipe. Ran cased hole logs. Rill with perf guns. Packer failed. POH. Left junk in hole off packer. RIH with junk basket. RIH with Schlumberger guns and perforated from 13928' to 13845'. RIH with wireline and set WD isolation packer at 13935'. Wells Shut-In for DrilI-By: Mud Type: BRINE WT: 9.15 SURVEY MD ANGLE VIS: PV: YP: FL: DIRECTION TVD SECTION Solids: Temp: 60 °F COORDINATES DLS. BP EXPLOR~;I'ION Daily Drilling Report-- Prudhoe Bay Unit October 10, 1989 at 0600 hrs Rig: Audi #2 Well: Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 14190' Day: 32 24- Hour Ftg: '0 Current Operation: Set plug in X-nipple. Ran 3-1/2" robing. ND BOP's. NU tree and tested to 5000g. WeLls Shut-In for DriLl-By: Mud Type: BRINE WT: 9.15 VIS: PV: YP: SURVEy MD ANGLE DIRECTION SE~I~ON Solids: Temp: 60 °F 'COORDINATES DLS BP EXPLOR,";llON Daily Drilling Report -- Prudhoe Bay Unit October 11, 1989 at 0600 hrs Rig: Audi #2 Welh Z-18 (24-29-11-12) AFE # 125040 API: 50-029-21971 AFE Amount: Current Amount: 0600 Depth: 14190'. Day: 33 24- Hour Ftg:' 0 Current Operation: Released rig at 1200 hrs. 10/10/89.. Set packer and tested robing at 3000~. Displaced well to diesel. Installed back pressure valve. Wells Shut-In for Drill-By: Mud Type: WT: SURVEY MI) ANGLE VIS: PV: YP: FL: DIRECTION TVD SE~F[ON Solids: Temp: °F .COORDINATES DLS MICROFILMED GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY BP EXPLORATION COMPANY WEST EILEEN # Z-18 WELL NAME PRUDHOE BAY LOCATION AL989-D35 SINGLE SHOT & MWD JOB NUMBER LYNN HENSLEY TYPE SURVEY DIRECTIONAL SUPERVISOR 9/28/89 DATE NAME TITLE SIGNATURE 435 FT 13411 FT DEPTH INTERVAL FROM TO 9/06/89 9/27/89 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. GREAT LAND DIRECTIONAL DRILLING,INC Client .............. : BP EXPLORATION Well ................ : WEST EILEEN # Z-18 Vertical Section at.: S 27.20 E Magnetic Declination: 30 deg 0 min E Data file name ...... : B:WZ18D.DAT RECORD OF SURVEY (Well assumed vertical to MD of 9/28/8 Computation: RADIUS OF CURVATURE · Survey date: 9/08/89 Method ..... : SINGLE SHOT & MWD RKB Height.: 91.6 ft 0.0) "EAS DRIFT TRUVERT SUBSEA SECTION ~~ JEPTH DG MN DEPTH DEPTH DIST 0 0 0 0.00 -91.55 435 0 18 435.00 343.45 525 0 30 525.00 433.45 617 0 30 616.99 525.44 709 1 6 708.98 617.43 DIRECTION RELATIVE COORDINATES CLOSURE ANGLE FROM WELL-HEAD DISTANCE DG MN S 0.00 N 0.00 E -0.79 N 18.80 E -1.12 N 43.40 E -1.35 N 49.00 E -0.83 S 51.20 E 0.00 N 0.00 E 1.08 N 0.37 E 1.61 N 0.69 E 2.17 N 1.27 E 2.19 N 2.45 E 0.00 N 0 0 0 E 1.14 N 18 47 60 E 1.75 N 23 8 43 E 2.51 N 30 20 5 E 3.29 N 48 13 13 E DOG LE deg/10 0.00 0.06 0.22 0.00 0.65 801 3 18 800.91 709.36 892 5 42 891.62 800.07 984 8 6 982.95 891.40 1075 11 6 1072.66 981.11 1166 14 30 1161.39 1069.84 2.52 S 40.30 E 9.55 S 32.90 E 20.54 S 33.60 E 35.59 S 35.70 E 55.51 S 36.40 E 0.27 S 4.98 E 6.00 S 9.23 E 15.24 S 15.29 E 27.72 S 23.92 E 44.02 S 35.78 E 4.98 S 86 53 25 E 11.01 S 56 59 6 E 21.59 S 45 5 37 E 36.61 S 40 47 8 E 56.73 S 39 6 16 Iii 2.39 2.63 2.60 3.29 3.73 1258 19 0 1249.46 1157.91 1351 21 24 1336.74 1245.19 1453 23 0 1431.17 1339.62 1542 20 24 1513.86 1422.31 1627 20 0 1593.63 1502.08 81.65 S 37.10 E 113.31 S 36.40 E 151.44 S 34.70 E 184.17 S 31.20 E 213.39 S 34.00 E 65.26 S 51.64 E 90.99 S 70.85 E 122.34 S 93.26 E 149.95 S 111.15 E 174.67 S 126.96 E 83.22 S 38 21 17 E 115.32 S 37 54 29 E 153.83 S 37 19 3 E 186.65 S 36 32 54 E 215.94 S 36 0 44 E 4.89 2.58 1.58 2.96 0.60 1720 23 24 1680.03 1588.48 1813 27 30 1763.98 1672.43 1906 28 54 1845.94 1754.39 2001 33 30 1927.18 1835.63 2094 37 54 2002.69 1911.14 247.44 S 36.40 E 286.77 S 38.20 E 330.03 S 36.40 E 378.73 S 34.30 E 432.41 S 36.80 E 202.77 S 146.78 E 234.55 S 170.99 E 269.50 S 197.62 E 309.63 S 226.09 E 353.77 S 257.63 E 250.32 S 35 54 2 E 290.26 S 36 5 36 E 334.20 S 36 15 7 E 383.39 S 36 8 10 E 437.64 S 36 3 49 E 3.67 4.42 1.57 4.88 4.83 2186 42 6 2073.15 1981.60 2280 46 12 2140.58 2049.03 2374 50 12 2203.22 2111.67 2468 50 18 2263.33 2171.78 2563 54 6 2321.54 2229.99 490.54 S 38.60 E 554.68 S 38.90 E 623.49 S 37.10 E 694.78 S 36.20 E 768.89 S 36.40 E 400.55 S 451.60 S 506.81 S 564.79 S 625.27 S 293.78 E 334.76 E 377.89 E 421.03 E 465.46 E 496.74 S 36 15 30 E 562.14 S 36 32 54 E 632.18 S 36 42 33 E 704.45 S 36 42 11 E 779.50 S 36 39 51E 4.64 4.36 4.40 0.57 4.00 WEST EILEEN # Z-18 9/28/89 RECORD OF SURVEY DRIFT TRUVERT SUBSEA SECTION MEAS DEPTH DG MN DEPTH DEPTH DIST ANGLE 2640 57 12 2364.99 2273.44 831.70 S 35.70 E 2753 54 36 2428.33 2336.78 924.23 S 35.70 E 2848 54 24 2483.50 2391.95 1000.75 S 35.40 E 2942 54 54 2537.88 2446.33 1076.64 S 35.40 E 3034 54 36 2590.98 2499.43 1150.97 S 35.70 E DIRECTION RELATIVE COORDINATES FROM WELL-HEAD 676.67 S 502.87 E 752.65 S 557.46 E 815.57 S 602.43 E 878.07 S 646.84 E 939.19 S 690.53 E 3110 55 0 2634.79 2543.24 1212.42 S 35.40 E 989.72 3200 54 18 2686.86 2595.31 1284.91 S 37.10 E 1048.92 3293 54 48 2740.80 2649.25 1359.54 S 37.10 E 1109.34 3387 54 48 2794.99 2703.44 1435.11 S 37.90 E 1170.28 3482 55 6 2849.54 2757.99 1511.44 S 38.60 E 1231.36 726.63 E 770.04 E 815.74 E 862.50 E 910.64 E 3577 54 42 2904.17 2812.62 1587.72 S 37.90 E 1292.39 S 958.76 E -3672 '54 36 2959.13 2867.58~' 1663.86 S 37.90 E 1353.54 S 1006.36 E 3766 54 36 3013.58 2922.03 1739.15 S 37.90 E 1414.00 S 1053.43 E 3859 54 36 3067.46 2975.91 1813.64 S 37.90 E 1473.81 S 1099.99 E 3955 54 30 3123.14 3031.59 1890.48 S 37.90 E 1535.52 S 1148.03 E 4050 54 42 3178.17 3086.62 1966.54 S 38.20 E 1596.50 S 1195.76 E 4141 55 0 3230.56 3139.01 2039.49 S 38.90 E 1654.69 S 1242.13 E 4236 55 24 3284.78 3193.23 2115.97 S 38.20 E 1715.70 S 1290.75 E 4329 55 36 3337.45 3245.90 2191.24 S 37.90 E 1776.06 S 1337.99 E 4424 56 30 3390.51 3298.96 2268.64 S 38.20 E 1838.11 S 1386.56 E 4517 57 18 3441.29 3349.74 2345.15 S 37.90 E 1899.46 S 1434.57 E 4607 58 30 3489.12 3397.57 2420.07 S 37.90 E 1959.62 S 1481.41 E 4700 58 6 3537.99 3446.44 2497.78 S 38.20 E 2021.93 S 1530.18 E 4795 58 6 .-3588.19 3496.64 2576.99 S 37,90 E 2085.44 S 1579.89 E 4890 58 0 3638.46 3546.91 2656.16 S 38.20 E 2148.92 S 1629.57 E 4983 57 42 3687.95 3596.40 2733.39 S 38.60 E 2210.63 S 1678.48 E 5077 57 24 3738.39 3646.84 2811.15 S 38.60 E 2272.62 S 1727.96 E 5171 57 12 3789.17 3697.62 2888.75 S 38.20 E 2334.61 S 1777.10 E 5265 57 0 3840.23 3748.68 2966.22 S 38.20 E 2396.63 S 1825.91 E CLOSURE DISTANCE DG MN S 843.06 S 36 37 5 E 936.61 S 36 31 35 E 1013.94 S 36 27 7 E 1090.60 S 36 22 40 E 1165.72 S 36 19 28 E 1227.82 S 36 17 7 E 1301.22 S 36 17 0 E 1376.98 S 36 19 42 E 1453.77 S 36 23 25 E 1531.50 S 36 29 5 E 1609.19 S 36 34 12 E 1686.66 S 36 37 51 E 1763.26 S 36 41 10 E 1839.05 S 36 44 10 E 1917.24 S 36 47 1 E 1994.66 S 36 49 58 E 2069.03 S 36 53 40 E 2147.01 S 36 57 17 E 2223.64 S 36 59 33 E 2302.43 S 37 1 43 E 2380.33 S 37 3 43 E 2456.56 S 37 5 17 E 2535.67 S 37 7 5 E 2616.31..S 37 8 48 E 2696.91 S 37 10 26 E 2775.63 S 37 12 31 E 2854.93 S 37 14 50 E 2934.02 S 37 16 42 E 3012.94 S 37 18 9 E DOG LE deg/10 4.07 2.30 0.29 0.53 0.39 0.58 1.46 0.53 0.56 0.58 0.64 0.10 0.00 0.00 0.10 0.29 0.61 0.65 0.30 0.97 0.89 1.33 0.48 .0.22 0.25 0.44 0.31 0.36 0.21 WEST EILEEN # Z-18 9/28/89 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DIRECTION RELATIVE COORDINATES DEPTH DG MN DEPTH DEPTH DIST ANGLE FROM WELL-HEAD 5453 57 0 3942.62 3851.07 3121.26 S 37.50 E 2521.42 S 1922.27 E 5546 56 48 3993.41 3901.86 3197.91 S 37.50 E 2583.23 S 1969.70 E 5641 56 18 4045.77 3954.22 3275.94 S 37.20 E 2646.24 S 2017.79 E 5735 56 0 4098.13 4006.58 3352.83 S 37.10 E 2708.47 S 2064.93 E 5829 56 12 4150.56 4059.01 3429.73 S 36.80 E 2770.82 S 2111.83 E 5923 56 24 4202.72 4111.17 3506.88 S 36.40 E 2833.60 S 2158.46 E 6047 57 0 4270.79 4179.24 3609.32 S 35.40 E 2917.55 S 2219.23 E 6142 57 0 4322.53 4230.98 3688.22 S 35.00 E 2982.66 S 2265.16 E 6235 56 54 4373.25 4281.70 3765.45 S 35.00 E 3046.51S 2309.87 E 6330 56 48 4425.20 4333.65 3844.26 S 35.00 E 3111.66 S 2355.49 E 6424 57 0 4476.54 4384.99 3922.27 S 35.00 E 3176.17 S 2400.66 E 6519 57 12 4528.14 4436.59 4001.29 S 35.10 E 3241.47 S 2446.47 E 6613 57 0 4579.20 4487.65 4079.44 S 35.40 E 3305.92 S 2492.02 E 6707 56 54 4630.46 4538.91 4157.49 S 34.70 E 3370.42 S 2537.26 E 6801 57 12 4681.59 4590.04 4235.60 S 35.70 E 3434.88 S 2582.73 E 6895 57 12 4732.51 4640.96 4313.78 S 35.30 E 3499.20 S 2628.62 E 6990 57 6 4784.04 4692.49 4392.82 S 35.00 E 3564.46 S 2674.56 E 7083 57 18 4834.42 4742.87 4470.34 S 34.30 E 3628.77 S 2719.01 E 7177 57 30 4885.06 4793.51 4548.89 S 34.70 E 3694.03 S 2763.86 E 7272 57 24 4936.18 4844.63 4628.25 S 35.00 E 3759.74 S 2809.62 E 7366 57 12 4986.96 4895.41 4706.62 S 35.00 E 3824.54 S 2854.99 E 7460 57 6 5037.95 4946.40 4784.82 S 35.40 E 3889.07 S 2900.51 E 7554 57 0 5089.08 4997.53 4862.93 S 35.00 E 3953.53 S 2945.98 E 7649 56 54 5140.89 5049.34 4941.82 ,S 35.00 E 4018.75 S 2991.65 E 7742 56 30 5191.95 5100.40 5018.73 S 36.10 E 4081.99 S 3036.85 E 7837 56 18 5244.52 5152.97 5096.87 S 36.40 E 4145.81 S 3083.64 E 7930 55 54 5296.39 5204.84 5173.07 S 36.40 E 4207.94 S 3129.44 E 8024 55 18 5349.50 5257.95 5249.63 S 36.40 E 4270.36 S 3175.47 E 8118 55 12 5403.07 5311.52 5325.91 S 36.10 E 4332.65 S 3221.14 E CLOSURE DISTANCE DG MN S DOG LE deg/10 3170.60 S 37 19 16 E 3248.51 S 37 19 31 E 3327.77 S 37 19 33 E 3405.84 S 37 19 19 E 3483.86 S 37 18 49 E 0.00 0.21 0.57 0.32 0.30 3562.06 S 37 17 52 E 3665.66 S 37 15 30 E 3745.29 S 37 12 53 E 3823.18 S 37 10 10 E 3902.66 S 37 7 31E 0.36 0.74 0.29 0.10 0.10 3981.36 S 37 4 60 E 4061.07 S 37 2 36 E 4139.96 S 37 0 33 E 4218.70 S 36 58 21 E 4297.54 S 36 56 24 E 0.21 0.22 0.30 0.53 0.81 4376.53 S 36 54 50 E 4456.30 S 36 52 57 E 4534.42 S 36 50 38 E 4613.54 S 36 48 13 E 4693.58 S 36 46 13 E 0.30 0.24 0.57 0.37 0.24 4772.64 S 36 44 28 E 0.21 4851.58 S 36 42 58 E 0.31 4930.43 S 36 41 30 E 0.31 5010.03 S 36.39 53 E 0.10 5087.74 S 36 38 52 E 0.92 5166.87 S 36 38 30 E 5244.06 S 36 38 17 E 5321.62 S 36 38 5 E 5398.85 S 36 37 45 E 0.30 0.43 0.63 0.24 WEST EILEEN # Z-18 9/28/89 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH DIST mmm DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 8308 54 36 5512.33 5420.78 5479.49 S 36.00 E 4458.29 S 3312.67 E 8402 54 36 5566.78 5475.23 5555.27 S 35.40 E 4520.51S 3357.38 E 8496 54 30 5621.30 5529.75 5631.03 S 35.70 E 4582.82 S 3401.91 E 8590 54 18 5676.02 5584.47 5706.69 S 35.00 E 4645.15 S 3446.13 E 8685 53 48 5731.79 5640.24 5782.89 S 35.00 E 4708.15 S 3490.24 E 8779 53 18 5787.64 5696.09 5857.76 S 35.40 E 4769.94 S 3533.82 E 8873 53 6 5843.94 5752.39 5932.29 S 35.10 E 4831.40 S 3577.26 E 8968 52 42 5901.25 5809.70 6007.22 S 36.40 E 4892.90 S 3621.53 E 9087 51 54 5974.02 5882.47 6100.16 S 36.40 E 4968.68 S 3677.40 E 9180 51 48 6031.47 5939.92 6172.78 S 31.20 E 5029.43 S 3718.07 E 9243 50 42 6070.90 5979.35 6221.88 S 26.40 E 5072.48 S 3741.74 E 9349 51 6 6137.75 6046.20 6304.01 S 22.00 E 5147.49 S 3775.45 E 9445 50 18 6198.56 6107.01 6377.93 S 21.00 E 5216.61S 3802.68 E 9537 49 12 6258.00 6166.45 6447.74 S 21.00 E 5282.16 S 3827.84 E 9629 48 42 6318.42 6226.87 6516.71 S 21.00 E 5346.93 S 3852.70 E 9720 48 18 6378.72 6287.17 6584.34 S 19.20 E 5410.93 S 3876.12 E 9812 48 48 6439.62 6348.07 6652.74 S 20.60 E 5475.77 S 3899.59 E 9916 48 54 6508.05 6416.50 6730.50 S 20.30 E 5549.15 S 3926.96 E 10009 49 18 6568.94 6477.39 6800.26 S 19.90 E 5615.16 S 3951.11 E 10102 49 54 6629.22 6537.67 6870.39 S 18.50 E 5682.04 S 3974.40 E 10196 49 36 6689.95 6598.40 6941.31 S 18.50 E 5750.08 S 3997.17 E 10290 49 42 6750.81 6659.26 7012.06 S 17.80 E 5818.15 S 4019.48 E 10384 51 0 6810.79 6719.24 7083.46 S 17.80 E 5887.06 S 4041.61 E 10478 51 54 6869.37 6777.82 7155.91 S 17.10 E 5957.19 S 4063.65 E 10573 53 0 6927.27 6835.72 7230.14 S 17.80 E 6029.04 S 4086.24 E 10671 53 48 6985.70 6894.15 7307.76 S 17.80 E 6103.95 S 4110.29 E 10763 53 24 7040.29 6948.74 7380.78 S 17.50 E 6174.51 S 4132.74 E 10856 53 0 7096.00 7004.45 7453.97 S 15.70 E 6245.87 S 4154.01 E 10948 52 36 7151.63 7060.08 7525.83 S 16.10 E 6316.35 S 4174.09 E CLOSURE DISTANCE DG MN S 5554.29 S 36 36 49 E 5630.90 S 36 36 5 E 5707.46 S 36 35 14 E 5783.88 S 36 34 15 E 5860.75 S 36 33 1 E 5936.34 S 36 31 59 E 6011.59 S 36 31 1 E 6087.36 S 36 30 27 E 6181.51 S 36 30 21 E 6254.54 S 36 28 27 E 6303.22 S 36 24 52 E 6383.62 S 36 15 30 E 6455.49 S 36 5 25 E 6523.31 S 35 55 47 E 6590.37 S 35 46 28 E 6656.01 S 35 36 57 E 6722.42 S 35 27 24 E 6798.09 S 35 17 9 E 6865.95 S 35 7 56 E 6934.08 S 34 58 18 E 7002.91 S 34 48 18 E 7071.57 S 34 38 20 E 7140.87 S 34 28 14 E 7211.-20 S 34 17 58 E 7283.31 S 34 7 40 E 7358.85 S 33 57 20 E 7429.95 S 33 47 43 E 7501.12 S 33 37 38 E 7570.95 S 33 27 30 E DOG LE deg/10 0.32 0.42 0.23 0.53 0.52 0.59 0.29 0.96 0.67 3.45 4.88 2.54 1.03 1.19 0.54 1.18 1.01 0.19 0.49 1.09 0.31 0.44 1.38 1.06 1.25 0.81 0.48 1.30 0.51 WEST EILEEN # Z-18 9/28/89 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DIRECTION RELATIVE COORDINATES DEPTH DG MN DEPTH DEPTH DIST ANGLE FROM WELL-HEAD 11134 51 54 7265.56 7174.01 7669.33 S 13.90 E 6458.58 S 4211.27 E 4.1227 51 18 7323.33 7231.78 7740.15 S 13.20 E 6529.43 S 4228.35 E ~1290 51 12 7362.76 7271.21 7787.75 S 12.50 E 6577.33 S 4239.28 E 11383 52 6 7420.46 7328.91 7858.25 S 12.20 E 6648.58 S 4254.88 E 11477 53 6 7477.56 7386.01 7930.06 S 10.40 E 6721.80 S 4269.51 E CLOSURE DISTANCE DG MN S 7710.26 S 33 6 22 E 7778.97 S 32 55 35 E 7825.14 S 32 48 10 E 7893.52 S 32 37 5 E 7963.12 S 32 25 21 E 11571 52 36 7534.32 7442.77 8001.87 S 10.80 E 6795.45 S 4283.29 E 11665 52 24 7591.55 7500.00 8073.06 S 9.00 E 6868.91 S 4296.11 E 11759 52 6 7649.10 7557.55 8143.81 S 9.70 E .6942.25 S 4308.19 E 11852 51 54 7706.35 7614.80 8213.57 S 9.00 E 7014.56 S 4320.09 E 11947 51 48 7765.04 7673.49 8284.54 S 9.00 E 7088.35 S 4331.78 E 8032.73 S 32 13 26 E 8101.76 S 32 1 25 E 8170.39 S 31 49 22 E 8238.16 S 31 37 40 E 8307.16 S 31 25 47 E 12009 51 54 7803.33 7711.78 8330.81 S 8.70 E 7136.52 S 4339.28 E 12134 52 48 7879.69 7788.14 8424.47 S 8.00 E 7234.44 S 4353.65 E ~2228 53 6 7936.32 7844.77 8495.32 S 8.00 E 7308.73 S 4364.09 E 12321 53 30 7991.90 7900.35 8565.43 S 6.60 E 7382.69 S 4373.57 E 12465 52 42 8078.36 7986.81 8674.27 S 9.70 E 7496.67 S 4389.89 E 8352.20 S 31 18 4 E 8443.42 S 31 2 22 E 8512.51 S 30 50 30 E 8580.92 S 30 38 34 E 8687.41 S 30 21 8 E 2570 52 30 8142.14 8050.59 8754.44 S 12.70 E 7578.48 S 4406.09 E 12665 51 54 8200.36 8108.81 8826.91 S 11.50 E 7651.88 S 4421.82 E 12785 51 12 8274.98 8183.43 8917.13 S 10.40 E 7744.14 S 4439.68 E 12851 51 12 8316.34 8224.79 8966.38 S 10.40 E 7794.73 S 4448.96 E 12944 51 36 8374.36 8282.81 9035.82 S 9.70 E 7866.30 S 4461.64 E 8766.24 S 30 10 25 E 8837.63 S 30 1 21 E 8926.50 S 29 49 31 E 8975.03 S 29 42 58 E 9043.50 S 29 33 40 E 13058 51 48 8445.01 8353.46 9120.91 S 8.70 E 7954.61 S 4475.95 E 9127.43 S 29 21 57 E 13132 51 30 8490.93 8399.38 9175.65 S 6.90 E 8012.11 S 4483.82 E 9181.42 S 29 13 58 E 13225 50 54 8549.20 8457.65 9243.62 S 6.90 E 8084.06 S 4492.53 E 9248.51 S 29 3 44 E 13318 50 18 8608.,23 8516.68 9310.71 S, 5..50 E 8155.50 S 4500..29,E, 9314.76 S 28 53 25 E 13411 49 42 8668.01 8576,46 9376.58 S 4.10 E 8226.49 S 4506.25 E 9379.84 S 28 42 46 E DOG LE deg/10 0.41 0.79 0.69 0.98 1.62 0.59 1.22 0.56 0.51 0.10 0.34 0.80 0.31 1.06 1.47 1.80 1.00 0.80 0.00 0.63 0.56 1.54 0.64 1.10 1.08 WEST EILEEN # Z-18 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 9/28/89 mmmmmm MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 92 92 0 0 0 192 192 100 0 0 292 292 200 0 0 392 392 300 0 0 492 492 400 0 0 592 592 500 0 0 692 692 600 0 0 792 792 700 0 0 892 892 800 0 0 993 992 900 1 1 · 1094 .. 1092 1000 2 1 · -1198 1192 1100 6 4 1303 1292 1200 11 5 1410 1392 1300 18 7 1518 1492 1400 26 8 1625 1592 1500 33 7 1733 1692 1600 41 8 1844 1792 1700 52 11 1959 1892 1800 67 15 2080 1992 1900 88 21 2212 2092 2000 120 32 2356 2192 2100 164 44 2514 2292 2200 222 58 2687 2392 2300 2.95 73 2862 2492 2400 370 75 3035 2592 2500 443 73 3208 2692 2600 516 73 3381 2792 2700 589 73 3555 2892 2800 663 74 RELATIVE COORDINATES FROM WELL-HEAD m 0.23 N 0.08 E 0.47 N 0.16 E 0.72 N 0.25 E 0.97 N 0.33 E 1.41 N 0.57 E 2.01 N 1.11 E 2.19 N 2.23 E 0.02 S 4.72 E 5.99 S 9.23 E 16.44 S 16.12 E 31.19 S 26.44 E 51.29 S 41.21E 77.67 S 60.90 E 109.19 S 83.86 E 142.50 S 106.32 E 174.03 S 126.55 E 207.13 S 150.10 E 246.30 S 179.95 E 292.03 S 213.60 E 347.26 S 252.98 E 414.48 S 304.96 E 496.52 S 369.85 E 594.11 S 442.57 E 708.53 S 525.76 E 824.82 S 609.00 E 939.85 1054.17 1166.42 1278.29 690.99 E 774.01 E 859.53 E 947.65 E WEST EILEEN # Z-18 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 9/28/89 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 3901 4073 4248 4426 4612 4801 4990 5175 5359 5543 5723 5903 6085 6268 6452 6636 6819 7004 7189 7374 7559 7741 7921 8098 8272 8445 8616 8786 8952 3092 3000 809 73 3192 3100 881 72 3292 3200 956 75 3392 3300 1034 78 3492 3400 1120 86 3592 3500 1209 89 3692 3600 1298 89 3792 3700 1383 85. 3892 3800 1467 84 3992 3900 1551 84 4092 4000 1631 80 4192 4100 1711 80 4292 4200 1793 82 4392 4300 1876 83 4492 4400 1960 84 4592 4500 2044 84 4692 4600 2127 83 4792 4700 2212 85 4892 4800 2297 85 4992 4900 2382 85 5092 5000 2467 85 5192 5100 2549 82 5292 5200 2629 80 5392 5300 2706 .77 5492 5400 2780 74 5592 5500 2853 73 5692 5600 2924 71 5792 5700 2994 70 5892 5800 3060 66 RELATIVE COORDINATES FROM WELL-HEAD 1500.52 S 1611.37 S 1723.46 S 1839.37 S 1962.72 S 1120.78 E 1207.61 E 1296.82 E 1387.54 E 1483.83 E 2089.68 S 2215.05 S 2337.50 S 2459.04 S 2580.97 S 1583.21 E 1682.01 E 1779.37 E 1874.40 E 1967.97 E 2700.64 S 2820.16 S 2943.67 S 3069.46 S 3195.17 S 2059.01 E 2148.48 E 2237.66 E 2325.94 E 2413.99 E 3321.46 S 3447.46 S 3574.04 S 3702.37 S 3830.35 S 2502.92 E 2591.71 E 2681.19 E 2769.67 E 2859.09 E 3956.64 S 4081.50 S 4202.14 S 4319.25 S 4434.52 S 2948.16 E 3036.50 E 3125.17 E 3211.31 E 3295.37 E 4548.82 S 4662.70 S 4774.21 S 4882.49 S 3377.61 E 3458.41 E 3536.84 E 3614.04 E WEST EILEEN # Z-18 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 9/28/89 · MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 9276 9434 9588 9739 9891 10044 10198 10354 10514 10681 10849 11013 11176 11336 11500 [1665 11828 11990 12154 12320 12487 12651 12811 12972 13133 6092 6000 3184 61 6192 6100 3242 58 6292 6200 3296 54 6392 6300 3347 51 6492 6400 3399 52 6592 6500 3452 53 6692 6600 3506 54 6792 6700 3562 56, 6892 6800 3622 60 6992 6900 3689 67 7092 7000 3757 68 7192 7100 3821 64 7292 7200 3884 63 7392 7300 3944 60 7492 7400 4008 64 7592 7500 4073 65 7692 7600 4136 63 7792 7700 4198 62 7892 7800 4262 64 7992 7900 4328 66 8092 8000 4395 67 8192 8100 4459 64 8292 8200 4519 60 8392 8300 4580 61 8492 8400 4641 61 RELATIVE COORDINATES FROM WELL-HEAD 5095.65 5208.64 5318.13 5424.60 5531.45 3752.15 E 3799.54 E 3841.65 E 3881.07 E 3920.36 E 5640.25 5751.86 5864.95 5984.71 6111.51 3959.85 E 3997.75 E 4034.51E 4072.30 E 4112.69 E 6240.17 6366.38 6490.45 6612.88 6739.96 4152.31 E 4187.68 E 4218.96 E 4247.06 E 4272.90 E 6868.91 6995.86 7121.70 7250.00 7382.22 4296.11 E 4317.01 E 4336.97 E 4355.84 E 4373.51 E 7513.59 7640.77 7764.41 7887.79 8012.87 4393.24 E 4419.44 E 4443.39 E 4465.12 E 4483.92 E 13292 8592 8500 4700 59 8135.31 S 4498.10 E WEST EILEEN # Z-18 DATA INTERPOLATED FOR EVEN 1000 FEET OF MEASURED DEPTH 9/28/89 MEAS. TRU VERT SUB SEA DEPTH DEPTH DEPTH 1000 999 907 2000 1926 1834 3000 2571 2479 4000 3149 3057 5000 3697 3605 6000 4245 4153 7000 4789 4697 8000 5336 5244 9000 5921 5829 10000 6563 6471 11000 7183 7091 12000 7798 7706 13000 8409 8317 RELATIVE COORDINATES FROM WELL-HEAD 17.43 S 309.21 S 916.60 S 1564.41S 2221.84 S 16.81 E 225.79 E 674.38 E 1170.64 E 1687.43 E 2885.73 3571.37 4254.43 4913.28 5608.77 2196.20 E 2679.34 E 3163.72 E 3636.55 E 3948.77 E 6356.11 7129.53 7909.68 4184.89 E 4338.19 E 4468.67 E 9OO 2700 3600 4500 ...... 5400 6300 7~00 8i00 .......... 9000 9900 ..... -~--- 10800 it700 l~§O0 -900 0 VERTICAL SECTION BP EXPLORATION NEST EILEEN # Z-lB SECTION AT S 27.20 E TVD SCALE : I inch = 1800 feet OEP SCALE: I inch = 1BO0 frier DRAWN ' 9/28/89 Harker lden[tftca[ton ~ TVD DEPRT ~) KB 0 0 0 B) TD t34tt B668 9377 ,-,,+ .~00 t~oo 2700 3600 4500 5400 6300 7200 8~00 9000 9900 Oepar'tur'e Nankep ~ent~at~on ~ ~ OEPRT A) KB 0 0 0 B) TD t345~ B668 9377 PLAN VIEW ~P F.'XF"LL~F~ATi ON NE,S'!' E.[LEF:N CL.O~',.If. iE: 9380 ft S 2,6.7 E DECLINATION: 30.00 de!l E SCAL[T ' ! ~n',':h--: 1500 feet DRAWN: 65O 65O 1300 2600 3250 \\\ I \ \ 3900 ................................................ .\ 52.00 ................................................................... ; .... -~.~ ........ t .......... 5850 6500 7150 \ \ \ ............ 1 ........................... 1 .........1 ...... ! ......... l ............ 1 ............. 650 0 650 t300 1!]50 2600 3,250 ;~,900 4550 7BO0 8450 5200 5850 6500 7150 ,[ TELECO 1 Te~eco Oilfield Ser~.v~s of Alaska Inc. / 61 16 Nielson Way Anchorage, AK 99502 (907) 562-2646 September 29, 1989 MICROI:II. MED JOB #715 BP EXPLORATION (ALASKA) INC. WELL: Z-18 PRUDHOE BAY RIG: AUDI #2 Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, · Jonathan G. Mapes Field Operations Supervisor JGM/el Enclosures A S(~iAT COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 9-9-89 Company: B.P. EXPLORATION Well: Z-18 Location: PRUDHOE BAY UNIT Rig: AUDI #2 (ALASKA) TELECO Job ~ Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 715TAK 0.0° 30.0° 30.0° 152.8° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* TIE-IN TO VERTICAL BELOW CONDUCTOR 100 0 0.0 18.8 100.00 -0.00 0.01N 0.01E 0.01 N 45.00E 0.00 TELECO MWD 435 335 0.3 18.8 435.00 -0.63 0.87N 0.30E 0.92 N 19.19E 0.09 525 90 0.7 26.8 524.99 -1.12 1.58N 0.63E 1.70 N 21.59E 0.45 617 92 0.5 49.0 616.99 -1.55 2.35N 1.18E 2.63 N 26.74E 0.33 709 92 1.1 128.8 708.98 -0.84 2.06N 2.17E 2.99 N 46.58E 1.22 PAGE 1 Company: B.P. EXPLORATION (ALASKA), Well: Z-]~8, Location: PRUDHOE BAY UNIT, Riq: AUDI #2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 801 92 3.3 139.7 800.91 2.55 0.52S 4.57E 4.60 S 83.56E 2.42 892 91 5.7 147.1 891.62 9.60 6.31S 8.72E 10.77 S 54.12E 2.71 984 92 8.1 146.4 982.95 20.59 15.55S 14.79E 21.46 S 43.58E 2.61 1075 91 11.1 144.3 1072.67 35.63 28.00S 23.45E 36.53 S 39.95E 3.32 1166 91 14.5 143.6 1161.39 55.54 44.29S 35.33E 56.66 S 38.58E 3.74 1258 92 19.0 142.9 1249.46 81.68 65.52S 51.21E 83.16 S 38.01E 4.91 1351 93 21.4 143.6 1336.73 113.36 91.26S 70.42E 115.27 S 37.65E 2.58 1453 102 21.3 145.3 1431.73 150.10 121.47S 92.01E 152.38 S 37.14E 0.62 1542 89 20.2 148.8 1514.96 181.45 147.91S 109.17E 183.83 S 36.43E 1.86 1627 85 20.0 146.0 1594.79 210.53 172.52S 124.90E 212.99 S 35.90E 1.15 1720 93 23.4 143.6 1681.18 244.57 200.58S 144.77E 247.37 S 35.82E 3.77 1813 93 27.5 141.8 1765.14 283.90 232.34S 169.01E 287.31 S 36.03E 4.49 1906 93 28.9 143.6 1847.10 327.16 267.30S 195.63E 331.24 S 36.20E 1.76 2001 95 33.5 145.7 1928.34 375.87 307.46S 224.04E 380.43 S 36.08E 4.98 PAGE 2 Company: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Riq: AUDI #2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 2094 93 37.9 143.2 2003.85 429.53 351.56S 255.63E 434.67 S 36.02E 4.98 2186 92 42.1 141.4 2074.31 487.65 398.31S 291.82E 493.77 S 36.23E 4.74 2280 94 46.2 141.1 2141.75 551.78 449.35S 332.79E 559.17 S 36.52E 4.37 2374 94 50.2 142.9 2204.39 620.60 504.58S 375.90E 629.20 S 36.69E 4.49 2468 94 50.3 143.2 2264.50 691.83 562.34S 419.34E 701.47 S 36.71E 0.27 2563 95 54.1 143.6 2322.71 765,87 622.59S 464.08E 776.53 S 36.70E 4.01 2660 97 57.2 143.3 2377.44 844.88 686.92S 511.77E 856.60 S 36.69E 3.21 2753 93 54.6 144.3 2429.57 920.94 749.05S 557.26E 933.60 S 36.65E 2.93 2848 95 54.4 144.6 2484.74 997.46 811.97S 602.22E 1010.93 S 36.56E 0.33 2942 94 54.9 144.6 2539.13 1073.34 874.47S 646.64E 1087.58 S 36.48E 0.53 3034 92 54.6 144.3 2592.22 1147.68 935.59S 690.32E 1162.70 S 36.42E 0.42 3110 76 55.0 144.6 2636.03 1209.12 986.12S 726.43E 1224.80 S 36.38E 0.63 3200 90 54.3 142.9 2688.09 1281.62 1045.33S 769.83E 1298.21 S 36.37E 1.73 PAGE 3 Company: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Riq: AUDI ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 3293 93 54.8 142.9 2742.03 1356.25 1105.75S 815.53E 1373.96 S 36.41E 0.54 3387 94 54.8 142.1 2796.22 1431.82 1166.69S 862.29E 1450.76 S 36.47E 0.70 3482 95 55.1 141.4 2850.78 1508.15 1227.76S 910.44E 1528.50 S 36.56E 0.68 3577 95 54.7 142.1 2905.40 1584.43 1288.80S 958.56E 1606.19 S 36.64E 0.73 3672 95 54.6 142.1 2960.37 1660.57 1349.94S 1006.15E 1683.65 S 36.70E 0.11 3766 94 54.6 142.1 3014.82 1735.86 1410.40S 1053.22E 1760.26 S 36.75E 0.00 3859 93 54.6 142.1 3068.69 1810.35 1470.22S 1099.79E 1836.05 S 36.80E 0.Q0 3955 96 54.5 142.1 3124.37 1887.19 1531.93S 1147.83E 1914.24 S 36.84E 0.11 4050 95 54.7 141.8 3179.40 1963.25 1592.91S 1195.56E 1991.66 S 36.89E 0.33 4141 91 55.0 142.1 3231.79 2036.33 1651.51S 1241.42E 2066.06 S 36.93E 0.43 4236 95 55.4 141.8 3286.00 2112.94 1712.94S 1289.50E 2144.06 S 36.97E 0.49 4329 93 55.6 142.1 3338.67 2188.22 1773.29S 1336.74E 2220.69 S 37.01E 0.34 4424 95 56.5 141.8 3391.73 2265.61 1835.35S 1385.31E 2299.48 S 37.05E 0.98 PAGE 4 ComDany: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Riq: AUDI #2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100~ 4517 93 57.3 142.1 3442.52 2342.13 1896.70S 1433.33E 2377.37 S 37.08E 0.90 4607 90 58.5 142.1 3490.34 2417.04 1956.86S 1480.16E 2453.61 S 37.10E 1.33 4700 93 58.1 141.8 3539.21 2494.75 2019.17S 1528.93E 2532.72 S 37.13E 0.51 4795 95 58.1 142.1 3589.41 2573.96 2082.68S 1578.64E 2613.36 S 37.16E 0.~27 4890 95 58.0 141.8 3639.68 2653.13 2146.16S 1628.33E 2693.97 S 37.19E 0.28 4983 93 57.7 141.4 3689.16 2730.38 2207.87S 1677.24E 2772.69 S 37.22E 0.49 5077 94 57.4 141.4 3739.59 2808.14 2269.86S 1726.73E 2851.99 S 37.26E 0.32 5171 94 57.2 141.8 3790.38 2885.73 2331.85S 1775.86E 2931.08 S 37.29E 0.42 5265 94 57.0 141.8 3841.43 2963.21 2393.88S 1824.67E 3010.00 S 37.32E 0.20 5360 95 57.0 142.5 3893.16 3041.52 2456.80S 1873.56E 3089.68 S 37.33E 0.62 5453 93 57.0 142.5 3943.79 3118.27 2518.68S 1921.05E 3167.68 S 37.33E 0.00 5546 93 56.8 142.5 3994.58 3194.92 2580.50S 1968.48E 3245.59 S 37.34E 0.22 5641 95 56.3 142.5 4046.94 3272.91 2643.38S 2016.73E 3324.86 S 37.34E 0.53 PAGE 5 Company: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Riq: AUDI ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 5735 94 56.0 142.9 4099.29 3349.77 2705.48S 2064.04E 3402.93 S 37.34E 0.47 5829 94 56.2 143.2 4151.71 3426.67 2767.84S 2110.95E 3480.95 S 37.33E 0.33 5923 94 56.4 143.6 4203.87 3503.82 2830.62S 2157.57E 3559.15 S 37.32E 0.41 6047 124 57.0 144.6 4271.94 3606.28 2914.58S 2218.34E 3662.76 S 37.28E 0.83 6142 95 57.1 145.0 4323.61 3685.22 2979.73S 2264.29E 3742.43 S 37.23E 0.37 6235 93 56.9 144.6 4374.26 3762.46 3043.47S 2309.25E 3820.38 S 37.19E 0.43 6330 95 56.8 145.0 4426.21 3841.23 3108.47S 2355.09E 3899.87 S 37.15E 0.38 6424 94 57.0 145.0 4477.53 3919.25 3172.98S 2400.25E 3978.57 S 37.11E 0.22 6519 95 57.2 144.6 4529.13 3998.24 3238.17S 2446.22E 4058.29 S 37.07E 0.41 6613 94 57.0 144.6 4580.18 4076.36 3302.50S 2491.94E 4137.19 S 37.04E 0.20 6707 94 56.9 145.3 4631.44 4154.42 3367.01S 2537.19E 4215.93 S 37.00E 0.63 6801 94 57.2 144.3 4682.56 4232.53 3431.46S 2582.66E 4294.78 S 36.97E 0.95 6896 95 57.2 145.7 4734.03 4311.64 3496.87S 2628.46E 4374.58 S 36.93E 1.24 PAGE 6 ComDany: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Riq: AUDI ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 6990 94 57.1 145.0 4785.02 4389.94 3561.84S 2673.36E 4453.48 S 36.89E 0.63 7083 93 57.3 145.7 4835.40 4467.46 3626.15S 2717.80E 4531.60 S 36.85E 0.66 7177 94 57.5 145.3 4886.04 4546.01 3691.41S 2762.65E 4610.72 S 36.81E 0.42 7272 95 57.4 145.0 4937.16 4625.37 3757.13S 2808.40E 4690.75 S 36.78E 0.28 7366 94 57.2 145.0 4987.94 4703.74 3821.94S 2853.76E 4769.82 S 36.75E 0.21 7460 94 57.1 144.6 5038.93 4781.94 3886.47S 2899.28E 4848.76 S 36.72E 0.38 7554 94 57.0 145.0 5090.05 4860.06 3950.93S 2944.74E 4927.62 S 36.70E 0.38 7644 90 56.9 145.0 5139.13 4934.81 4012.74S 2988.00E 5003.02 S 36.67E 0.12 7742 98 56.5 143.9 5192.93 5015.85 4079.39S 3035.62E 5084.92 S 36.65E 1.03 7837 95 56.3 143.9 5245.50 5094.02 4143.32S 3082.24E 5164.04 S 36.65E 0.21 7930 93 55.9 143.6 5297.37 5170.25 4205.57S 3127.88E 5241.23 S 36.64E 0.51 8024 94 55.3 143.6 5350.48 5246.81 4268.00S 3173.91E 5318.79 S 36.64E 0.64 8118 94 55.2 143.9 5404.06 5323.09 4330.28S 3219.58E 5396.02 S 36.63E 0.28 PAGE 7 Company: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Riq: AUDI ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 8213 95 54.9 143.9 5458.48 5400.02 4393.20S 3265.46E 5473.88 S 36.62E 0.32 8308 95 54.6 143.9 5513.31 5476.66 4455.88S 3311.17E 5551.46 S 36.62E 0.32 8402 94 54.6 144.6 5567.76 5552.43 4518.07S 3355.93E 5628.07 S 36.60E 0.61 8496 94 54.5 144.3 5622.28 5628.19 4580.37S 3400.45E 5704.63 S 36.59E 0.28 8590 94 54.3 145.0 5677.00 5703.85 4642.71S 3444.67E 5781.05 S 36.57E 0.65 8685 95 53.8 145.0 5732.77 5780.05 4705.72S 3488.77E 5857.92 S 36.55E 0.53 8779 94 53.3 144.6 5788.62 5854.93 4767.50S 3532.35E 5933.51 S 36.54E 0.64 8873 94 53.1 144.3 5844.93 5929.40 4828.74S 3576.11E 6008.77 S 36.52E 0.33 8968 95 52.7 143.6 5902.23 6004.27 4890.00S 3620.70E 6084.54 S 36.52E 0.72 9087 119 51.9 143.6 5975.01 6097.21 4965.79S 3676.57E 6178.69 S 36.52E 0.67 9180 93 50.8 148.8 6033.11 6169.31 5026.09S 3716.97E 6251.20 S 36.48E 4.52 9243 63 50.7 153.4 6072.99 6218.05 5068.78S 3740.54E 6299.54 S 36.43E 5.66 9349 106 51.1 158.0 6139.86 6300.16 5143.73S 3774.36E 6379.94 S 36.27E 3.40 PAGE 8 Company: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Rig: AUDI ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 9445 96 50.3 159.0 6200.66 6374.09 5212.85S 3801.58E 6451.80 S 36.10E 1.16 9537 92 49.2 159.0 6260.11 6443.89 5278.40S 3826.73E 6519.62 S 35.94E 1.20 9630 93 48.7 159.0 6321.18 6513.61 5343.88S 3851.86E 6587.40 S 35.78E 0.54 9720 90 48.3 160.8 6380.82 6580.50 5407.18S 3875.02E 6652.32 S 35.63E 1.56 9822 102 48.8 159.4 6448.34 6656.33 5479.06S 3901.05E 6725.94 S 35.45E 1.14 9916 94 48.9 159.7 6510.20 6726.61 5545.38S 3925.78E 6794.33 S 35.30E 0.26 10009 93 49.3 .160.1 6571.09 6796.37 5611.39S 3949.93E 6862.19 S 35.14E 0.54 10102 93 49.9 161.5 6631.37 6866.50 5678.27S 3973.22E 6930.31 S 34.98E 1.32 10196 94 49.6 161.5 6692.10 6937.42 5746.31S 3995.99E 6999.14 S 34.81E 0.32 10290 94 49.7 162.2 6752.96 7008.17 5814.38S 4018.30E 7067-.80 S 34.65E 0.58 10384 94 51.0 162.9 6812.94 7079.50 5883.43S 4040.00E 7136.97 S 34.48E 1.51 10478 94 51.9 162.9 6871.51 7151.88 5953.70S 4061.62E 7207.17 S 34.30E 0.95 10573 95 53.0 162.2 6929.40 7226.11 6025.55S 4084.21E 7279.29 S 34.13E 1.31 PAGE 9 Company: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Riq: AUDI ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 10671 98 53.8 162.2 6987.82 7303.74 6100.47S 4108.26E 7354.83 S 33.96E 0.81 10763 92 53.4 162.5 7042.42 7376.76 6171.03S 4130.71E 7425.93 S 33.80E 0.51 10856 93 53.0 164.3 7098.12 7449.95 6242.39S 4151.99E 7497.10 S 33.63E 1.61 10948 92 52.6 163.9 7153.74 7521.82 6312.88S 4172.07E 7566.94 S 33.46E 0.57 11041 93 52.2 165.7 7210.49 7593.89 6383.98S 4191.39E 7636.94 S 33.29E 1.59 11134 93 51.9 166.1 7267.68 7665.31 6455.10S 4209.25E 7706.24 S 33.11E 0.47 11227 93 51.3 166.8 7325.45 7736.14 6525.95S 4226.33E 7774.96 S 32.93E 0.87 11290 63 51.2 167.5 7364.88 7783.74 6573.86S 4237.26E 7821.12 S 32.80E 0.88 11383 93 52.1 167.8 7422.58 7854.24 6645.10S 4252.86E 7889.50 S 32.62E 1.00 11477 94 53.1 169.6 7479.68 7926.04 6718.32S 4267.48E 7959.10 S 32.42E 1.86 11571 94 52.6 169.2 7536.45 7997.85 6791.97S 4281.26E 8028.70 S 32.22E 0.63 11665 94 52.4 171.0 7593.67 8069.04 6865.43S 4294.08E 8097.73 S 32.02E 1.54 11759 94 52.1 170.3 7651.22 8139.78 6938.77S 4306.15E 8166.36 S 31.82E 0.68 PAGE 10 Company: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Riq: AUDI #2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg~ feet feet feet feet feet deg deg/100' ******************************************************************************************************* 11852 93 51.9 171.0 7708.48 8209.54 7011.08S 4318.05E 8234.12 S 31.63E 0.64 11947 95 51.8 171.0 7767.16 8280.50 7084.87S 4329.72E 8303.12 S 31.43E 0.11 12040 93 52.0 172.7 7824.54 8349.68 7157.32S 4340.09E 8370.40 S 31.23E 1.45 12134 94 52.8 172.0 7881.89 8419.86 7231.13S 4350.00E 8438.70 S 31.03E 1.02 12228 94 53.1 172.0 7938.52 8490.71 7305.43S 4360.43E 8507.79 S 30.83E 0.32 12321 93 53.5 173.4 7994.11 8560.81 7379.38S 4369.89E 8576.20 S 30.63E 1.27 12465 144 52.7 170.3 8080.58 8669.63 7493.35S 4386.20E 8682.69 S 30.34E 1.81 12570 105 52.5 167.3 8144.36 8749.80 7575.16S 4402.39E 8761.52 S 30.16E 2.28 12665 95 51.9 168.5 8202.59 8822.27 7648.56S 4418.13E 8832.91 S 30.01E 1.18 12758 93 51.2 169.6 8260.42 8892.19 7720.06S 4431.97E 8901.78 S 29.86E 1.19 12851 93 51.2 169.6 8318.70 8961.58 7791.35S 4445.05E 8970.15 S 29.71E 0.00 12944 93 51.6 170.3 8376.72 9031.02 7862.91S 4457.73E 9038.63 S 29.55E 0.73 13038 94 51.8 171.3 8434.98 9101.18 7935.73S 4469.53E 9107.83 S 29.39E 0.86 PAGE 11 Company: B.P. EXPLORATION (ALASKA), Well: Z-18, Location: PRUDHOE BAY UNIT, Riq: AUDI #2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 13132 94 51.5 173.1 8493.30 9170.71 8008.76S 4479.53E 9176.41 S 29.22E 1.54 13225 93 50.9 173.1 8551.58 9238.68 8080.71S 4488.24E 9243.50 S 29.05E 0.65 13318 93 50.3 174.5 8610.61 9305.77 8152.15S 4496.00E 9309.76 S 28.88E 1.33 13411 93 49.7 175.9 8670.39 9371.64 8223.14S 4501.97E 9374.85 S 28.70E 1.32 PAGE 12 -1000 0 2000 4000 ~8000 I ~8000 H >10000 12000 14000 16000 18000 TELECO Oilfield Services VERTICAL PROJECTION ~000 3000 5000 7000 9000 l~O00 35 .3 deg 892 ' 5.7 deg ~35~ ' 21,4 deg 8~3 ' 27.5 deg ' 74 ' 50.2 deg lO ' 55,0~ deg 59 ' 54.6 deg '~07 ' 58.5 deg '~.~60 ' 57.0J deg "~42 ' 57.1 deg "~96 ' 57.2 deg '~,~44 ' 56.9 deg '"'~02 · 54.6 deg "~87 ' 5~.9 deg '~720 " 48.3 deg "~384 ' 5~.0~ deg '~,~.134 · 5~.9 deg B.P. EXPLORATION (ALASKA Z-lB PRUDHOE BAY UNIT AUDI #2 JOB# 7&STAK/O0 SCALE:- ~ inch = 2000 feet VERTICAL SECTION (ft) g deg TELECO Oi 1 f ie ld PLAN VIEW SePvices B.P. EXPLORATION (ALASKA) :too-' Z-_18 V;o94 , PRUDHOE BAY UNIT k 2660' AUDI #2 '~- JOB# 715TAK/O0 ~2oo · SCALE: ~'~66 ' 1 inch = i600 feet 329 ' 453 ' 6047 ' 65i9 ' 6990 ' 460 ' 024" 8590 " 9087 ' 9630 lO i02 ' i0573" :t :t 947 ' i2465 ' 12944 ' i3411 ' EAST(ft) i600 1600 3200 4800 03 0 6400 800O 9600 11200 12800 9600 $ UB.S URFA CE DIRECTIONAL SURVEY J'~ LJIDANCE MICROFILMED J'-~JONTINUOUS J~"JooL Company BP EXPLORATION , Well Name Z-18(24-29-11-12)(984' SNL,1996' WEL,SEC 19,TllN,R12E),, Field/LoCation PRUDHOE BAY~ NORTH SLOPEr ALASKA I Job Reference No. Date 73520 6-0CT-89 ~ Computed By; COX KOHRING OCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION PRUDHOE BAY NORTH SLOPE~ ALASKA SURVEY DATE: 06-0CT-89 ENGINEER: COX METHODS OF COMPUTATION TOOL LOC~TION: T~NGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HCRIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH 0~ SOUTH 28 OEO ~4 MIN EAST COMPUTATION DSTE: 19-0CT-89 PAGE 1 BP EXPLORATION Z-18 (24-29-11-12) PRUOHOE BAY NORTH SLOPE, ALASKA D~&TE OF SURVEY: 06-0CT-89 KELLY BUSHING ELEVATION: 91.55 FT , ENGINEER: COX INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 -91.55 0 0 N 0 0 E 100.00 100.00 8.45 0 7 N 45 2 W 200.00 200.00 108.45 0 g N 79 41 E 300.00 300.00 208.45 0 9 N 5 28 W 400.00 400.00 308.45 0 10 N 78 42 E 500.00 500.00 408.45 0 20 N 28 3 E 600.00 600.00 508.45 0 13 N 53 45 E 700.00 699.99 608.44 I 13 S 65 18 E 800.00 799.89 708.34 3 42 S 40 54 E gO0.O0 899.52 807.97 6 4 S 32 30 E 0.00 0.00 0.00 N 0.00 E -0.07 0.00 0.06 N 0.02 W -0.10 0.02 0.14 N 0.04 E -0.24 0.24 0.37 N 0.21 E -0.28 0.39 0.43 N 0.23 E -0.43 0.15 0.77 N 0.57 E -0.73 0.43 1.19 N 0.73 E -0.33 3.27 1.14 N 1.53 E 3.73 2.55 1.79 S 4.74 E 12.17 2.44 8.74 S 9.70 E 0.00 N 0 0 E 0.07 N 19 34 W 0.14 N 17 39 E . 0.42 N 29 41 E ~ 0.49 N 28 6 E - ; 0.95 N 36 34 E 1.40 N 31 39 E 1.91 N 53 10 C- 5.06 S 69 19 E 13.06 S 47 58 E 1000.00 998.68 907.13 8 39 1100.00 lOg?.Og 1005.53 12 0 1200.00 1194.08 1102.53 16' 9 1300.00 1289.07 1197.52 lg 48 1400.00 1382.18 1290.63 22 50 1500.00 1474.4'3 1382.~8 21 36 1600.00 1568.22 1476.67 lg 51 1700.00 1661.68 1570.13 22 32 1800.00 1752.38 1660.83 26 51 1900.00 1840.64 1749.09 29 19 S 33 7 E 24.90 2.36 S 35 22 E 42.51 3.76 S 36 36 E 66.40 4.89 S 36 50 E 97.12 2.43 S 35 36 E 133.05 1.81 S ~ 15 ~: 171 27 ! 43 S 32 39 ~ 205.77 0.55 $ 34 46 E 241.04 4.19 S 36 23 E 282.58 2.54 S 35 46 E 322.93 3.49 19.55 S 16.55 E 25.61 S 40 15 E 34.1'9 S 26.62 E 43.33 S 37 54 E 53.77 S 40.86 E 67.53 S 37 14 E 78.76 S 59.54 E 98.73 S 37 5 E 108.14 S 81.08 E 135.16 S 3.6 52 E 139.92 S 102.96 E 173.72 S 36 21 E 169.09 S 121.73 E 208.35 S 35 45 E 198.64 S 141.45 E 243.86- S 35 27 E 232.80 S 166.00 E 285.92 S 35 30 E 270.69 S 193.80 E 332.91 S 35 36 E 2000.00 1925.93 1834.38 33 44 2100.00 2006.88 1915.33 38 18 2200.00 2082.80 1991.25 43 O 2300.00 2153.15 2061.$0 47 35 2400.00 2218.15 2126.50 50 55 2500.00 2281.24 2189.69 51 9 2600.00 2340.55 2249.00 56 3 2700.00 2396.84 2305.29 54 23 2800.00 2455.48 2363.93 54 6 2900.00 2514.04 2422.49 54 17 S 33 57 .: S 37 57 E S 37 55 E S 3 6 3 9 5 S 35 54 E S 35 23 -= S 34 57 E S 35 SE 380.58 4.56 438.64 5.47 502.59 5.35 572.22 4.60 546.92 1.36 723.44 3.19 802.93 3.34 884.71 2.35 964.~5 0.10 0.27 S 35 8 E 1045.05 313.62 S 223.37 E 385.04 S 35 28 E 361.71 S 256.98 E 443.70 S 35 24 E 413.50 S 296.32 E 508.71 S 35 38 E 469.35 S 340.21 E 579.68 S 35 56 E 529.88 S 336.12 f 655.64 S 36 5 E 592.45 S 431.99 E 733.22 S 36 6 E 657.83 S 478.89 E 813.65 S 36 3 E 725.49 S 526.35 E 896.32 S 35 58 E 791.79 S 572.89 E 977.31 S 35 53 E 858.12 S 619.49 E 1058.36 S 35 50 E 3000.00 2572.22 2480.67 54 25 3100.00 2630.42 253 8.87 54 18 3200.00 2688.88 2597.33 54 32 3300.00 2746.54 2654.99 54 42 3400.00 2804.16 2712.61 55 7 3500.00 2861.11 2769.56 55 25 3600.00 2918.41 2826.86 54 35 3700.00 2976.20 2584.65 54 45 3800.00 3034.07 2942.52 54 34 3900.00 3091.85 3000.30 54 42 S 35 17 _: 1125.50 S 35 9 E 1205.93 S 36 3 E 1286.09 S 36 32 E 1366.67 S 36 56 E 1447.15 S 37 14 E 1528.02 S 36 24 E 1608.68 S 36 39 E 1589.11 S 36 27 E 1769.47 S 36 35 E 1849.90 0.10 0.72 1.3! 1.04 0.42 0.66 0.18 0.31 0.87 0.41 924.60 S 666.34 E 1139.69 S 35 47 E 991.03 S 713.24 E 1221.09 S 35 45 E 1057.02 S 760.43 E 1302.13 S 35 44 E 1122.90 S 808.76 E 1383.83 S 35 46 E 1188.38 S 857.67 E 1465.55 S 35 49 E 1253.98 S 907.20 E 15~,7.73 S 35 53 E 1319.50 S 956.43 E 1629.67 S 35 56 E 1385.10 S 1004.98 E 1711.28 S 35 58 E 1450.63 S 1053.53 i 1792.83 S 35 59 E 1516.24 S 1102.06 E 1874.44. S 36 1 E COMPUTATION DATE: 19-0CT-89 PA G E 2 BP EXPLORATION Z-18 (24-29-11-123 PRUDHOE BAY NORTH SLDPEm ALASKA DATE gF SURVEY: 06-0CT-89 KELLY ~USHING ELEVATION: 91.55 FT ,7 ENGINEER: COX INTERPOLATED VALUES FaR EVEN 100 FEET DF MEASURED DEPTH TRUE SUB-SEA CDURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG REC'TANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4000.00 3149.55 3058.00 54 50 4100.00 3207.01 3115.46 55 11 4200.00 3253.86 3172.31 55 32 4300.00 3320.32 3228.77 55 45 4400°90 3376.07 3284.52 56 34 4500.00 3430.59 3339.04 57 29 4600.00 3483.68 3392.13 58 12 4700.00 3536.80 3445.25 57 40 4800.00 3590.01 3498.46 57 54 4900.00 3643.27 3551.72 57 47 S 35 53 E 1930.135 S 37 14 E 2010.86 S 37 10 E 2091.75 S 36 49 5 2172.97 S 37 7 E 2254.68 S .37 17 E 233'7.12 S 37 39 E 2420.37 S 37 36 E 2503.56. S 37 21 E 2586.75 S 37 15 E 2669.97 0.30 0.41 0.41 0.55 0.70 1.48 0.58 1.0 9 0.3'7 0.29 1581.73 S 1150.88 E 1956.12 S 36 2 E 1647.03 S 1200.21 E 2037.94 S 36 5 E 1712.52 S 1250.00 E 2120.19 S 36 8 E ~. 1778.48 S 1299.62 E 2202.72 S 35 9 E 1844.83 S 1349.50 E 2285.73 S 36 11 E 1911.63 S 1400.15 E 2369.55 S 36 13 E 1978.88 S 1451.71 E 2454.27 S 36 16 E 2045.95 S 1503.48 E 2538.97 S 36 19 E 2113.18 S 1554.95 E 2623.62 S 3,6 21 E 2180.56 S 1606.16 E 2708.25 S 36 22 E 5000.00 3696.76 3605,21 57 25 5100.00 3750.63 3659.08 57 15 5200.00 3805.04 371 3.49 56 42 5300.00 3859.79 3768.24 56 54 5400.00 3914.60 3823.05 56 44 5500.00 3969.37 3.~77.82 56 44 5600.00 4024.44 3932.89 56 26 5700.00 4080.16 3988.61 55 55 5800.00 4136.17 4044.52 55 53 5900.00 4191.98 4100.43 56 13 S 37 20 E 2753.03 S 37 24 E 2835.83 S 37 21 E 2918.29 S 37 9 E 3000.57 S 36 5,5 E 3082.86 S 36 5! E 3165.21 S 36 37 E 3247.41 S 36 35 E 3329.23 S 36 11 E 3410.87 S 35 44 E 3492.78 0.35 0.53 1.27 0.66 0.50 0.51 0.17 0.40 0.81 0.42 2247.79 S 1657.34 E 2792.73 S 36 24 E 2314.75 S 1708.48 E 2876.97 S 36 26 E 2381.42 S 1759.41 E 2960.8.5 S 36 27 E 2448.05 S 1810.03 E 3044.53 S 36 29 E 2514.80 S 1860.44 E 3128.17 S 36 30 E 2581.71 S 1910.66 E 3211.83 S 36 30 E 2648.59 S 1960.62 E 3295.31 S 36 31 E 2715.28 S 20110.09 E 3378.34 S 36 31 E 2781.89 S 2059.33 E '3461.18 S 36 31 E 2849.07 S 2108.04 E 3544.15 S 36 30 E 6000.00 4247.46 4155.91 56 29 6100.00 4302.36 4210.91 56 52 6200.00 43 57.02 4.265.47 56 44 6300.00 4412.13 4320.58 56 32 6400.00 4466.97 4375.42 56 52 6500.00 4521.77 4430.22 56 56 6600.00 4576.40 4484.85 56 52 6700.00 4631.29 4539.74 56 25 6800.00 4686.13 4594.58 56 53 6900.00 4740.58 4649.03 57 2 S 3.3, 21 5 3575.00 S 35 4 E 3657.68 S 34 48 E 3740.57 S 34 34 E 3~23.21 S 34 28 E 3906.07 S 34 31 E 3988.95 S 34 34 E 4071.94 S 34 30 E 4154.75 S 34 31 E 4237.$0 S 34 38 E 4320.70 0.67 0.49 0.44 0.65 0.43 0.53 0.43 0.80 0.86 0.53 2516.80 S 2156.37 E 3627.35 S 35 29 E 2935.12 S 2204.50 E 3710.90 S 36 27 E 3053.79 S 2252.43 E 3794.61 S 3,5 25 E 3122.43 S 2299.88 E 3878.02 S 36 22 E l 3191.36 S 2347.22 E 3961.59 S 36 20 E 3260.30 S 2394.60 5 4045.20 S 36 18 E 3329.32 S 2442.05 E 4128.92 S 36 16 E 3398.14 S 2489.49 E 4212.48 S 36 14 E 3467.08 S 2536.81 E 4296.05 S 36 12 E 3536.17 S 2584.38 E 4379.90 S 36 10 E 7000.00 4795.13 4703.58 56 51 7100.00 4849.49 4757.94 57 5 7200.00 4903.74 4812.19 57 9 7300.00 4958.03 4866.48 57 12 7400.00 5012.39 4920.84 57 4 7500.00 5066.88 4975.33 56 47 7600.00 5121.56 5030.01 56 47 7700.00 5176.42 5084.87 56 34 7800.00 5231.82 5140.27 56 12 7900.00 5287.58 5196.03 55 45 S 34 42 E 4403.T0 S 34 40 E 4486.83 S 34 4,5 E 4570.D3 S 34 49 5 4653.18 S 34 50 E 4736.28 S 34 46 E 4819.29 S 34 43 E 4902.20 S 34 5l E 4984.99 S 34 5!7 E 5067.39 S 35 8 E 5149.53 0.92 0.02 0.69 0.59 0.60 1.03 0.34 0.40 0.34 0.72 3605.10 S 2632.05 E 4463.68 S 36 B E 3674.13 S 2679.81 E 4547.59 S 36 6 E 3743.20 S 2727.62 E 4631.57 S 35 5 E 3812.16 S 2775.54 E 4715.53 S 36 3 E 3881.06 S 2823.48 E 4799.44 S 36 Z E 3949.90 S 2871.36 E 4883.27 S 36 1 E 4018.69 S 2919.07 E ~966.98 S 35 0 E 4087.33 S 2966.74 E 5050.57 S 35 58 E 4155.65 S 301W.39 E 5133.81 S 35 57 E 4223.59 S 3062.09 E 5216.81 S 35 57 E COMPUTATI3N DATE: 19-0CT-89 PAGE 3 BP EXPLDRATIDN Z-18 (24-29-11-123 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 06-0CT-89 KELLY ~USHING ELEVATION: 9.1.55 FT , ENGINEER: CDX INTERPOLATED VALUES FOR EVEN IO0 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN BEG MTN VERTICAL DOGLEG RECTANGULAR C~DRDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8000.00 5344.07 5252.52 55 30 8100.00 5401.05 5309.50 55 7 8200.00 5458.44 5366.89 54 51 8300.00 5516.33 5~24.78 54 24 8400.00 5574.50 5482.95 54 26 8500.00 5632.83 5541,28 54 20 8600.00 5691.33 5599.78 54 2 8700.00 5750.42 5658.87 53 29 8800.00 5810.19 5718.64 53 6 8900.00 5870.31 5778.76 52 55 S 35 7 E 5231.16 S 35 6 5 5312.46 S 35 7 E 5393.48 S 35 3 E 5474.16 S 34 55 E 5554.65 S 34 44 E 56.35.07 S 34 3~ E 5715.40 S 34 26 E 5795.33 $ 34 24 E 5874.78 S 34 53 E 5953.94 0.22 0.12 0.27 0.93 0 0.21 0.34 0.60 0 0.66 4291.09 S 3109.56 E 5299.32 S 35 56 E 4358.32 S. 3156.82 E 5381.49 S 35 55 E 4~25.32 S 3203.89 E 5463.37 S 3.5 54 E 4492.05 S 3250.77 E 5544.90 S 35 54 E ~ 4558.68 S 3297°40 E 5626.23 S 35 53 E - 4625.37 S 3343.79 E 5707.45 S 35 52 E 4692.06 S 3.389.93 E 5788.53 S 35 51 E 47,58.53 $ 3435.66 E 5869.19 S 35 50 E 4824.70 S 3430.92 E 5949.33 S 35 49 E 4890.46 S 3526.32 E 6029,23 S 35 48 E 9000.00 5930.92 5839.37 52 23 9100.00 5992.40 5900.85 51 44 9200.00 6055.14 5963.59 50 45 9300.00 6118.10 6026.55 51 22 9400.00 61~0.84 6089.29 5C 38 9500.00 6244.83 6153.28 49 46 9600.00 6310.01 6218.46 48 59 9700.00 6375.89 6284.34 48 37 9800.00 6441.91 6350.36 48 51 9900.00 6507.51 6415.96 49 3 S 35 11 E 6032.64 S 34 11 'E 6110.69 S 27 28 E 6188.29 S 22 21 E 626~.90 S !1 14 E 6343.45 S 20 51 E 6419.92 S 20 .26 E 6495'32 S 19 52 E 6570.06 S 19 38 E 6644.60 S 19 38 E 6719.50 0.68 3.41 5.42 2.34 0.83 1.03 0.61 0.4:5 0.62 0.80 4.955.57 S 3572.01 E 6108.76 S 35 47 E 5020.17 S 3617.26 E 6187.6:2 S 35 46 E 5086.93 S 3657.23 E 6265.15 S 35 .43 E 5157.52 S 3689.60 E 634.1.38 S 35 35 E 5229.92 S 3718.26 E 6416.97 S 35 25 E 5301.64 S 3745.85 E 6491.44 S 35 15 E 5372.61 $ 3772.56 E 6564,85 S 35 5 E 5443.24 S 3798.47 E 6637.56 S 3% 55 E 5513.95 S 3823.80 E 6710.08 S 3~ 44 E 55~5.04 S 3849.16 E 6782.97 S 34 34 E 10000.00 6572.62 6481.07 49 38 10100.00 6637.17 6545.62 49 54 10200.00 6701.77 661n.22 ~9 40 10300.00 6766.23 6674.58 50 3 10400.00 6829.66 6738.11 51 16 10500.00 6891.55 6800.00 52 22 10600.00 6951.71 6860.16 53 38 10700.00 7010.59 6319.04 53 54 10800.00 7069.84 6978.29 53 26 10900.00 7129.73 7038.18 52 57 S 19 24 E 6794.79 S 19 21 E 6870.55 S 18 48 E 6946.21 S 18 7 E 7021.86 S 17 48 E 7098.25 S 17 31 ~ 7175.80 S 17 7 ~ 7254.60 S 16 43 ~- 7]34.25 S 16 7 E 7413.50 S 15 23 E 7~92.12 0.55 0.29 0.68 0.77 0.55 1.24 1.45 0.99 0.55 0.56 5656.60 S 3874.46 E 5':356.2~ S 34 25 E 5728.64 S .38-)9.83 E 6930.08 S 34 15 E 5800.78 S 3924.81 E 7003.79 S 3~. 5 E 5873.29 S 3949.02 E 7077.45 S 33 55 E t 5946.85 S 3972.78 E 7151.78 S 33 45 E 6021.72 S 3996.54 E 7227.27 S 33 34 E 6097.97 S 4020.30 E 7303.98 S 33 24 E 6175.29 S 4043.86 E 7381.53 S 33 13 E 6252.58 S 4066.59 E 7458.68 S 33 2 E 6329.64 S 4088.37 E 7535.19 S 32 52 E 11000.00 7190.33 7098.78 52 29 11100.00 7251.49 7159.94 52 4 11200.00 7313.28 7221.73 51 36 11300.00 7375.58 7284.03 51 36 11400.00 7437.11 7345.56 52 34 11500.00 7497.31 7405.76 53 9 11600.00 7557.63 7466.08 52 41 11700.00 7618.43 7526.88 52 24 11800.00 7679.63 7588.08 52 5 11900.00 7741.15 7649.60 51 59 S 14 32 5 7569.99 S 13 36 E 7647.19 S 12 28 E 7723.57 S 11 31 E 7799.19 S lO 48 E 7875.12 S 10 25 5 7951.84 S 9 52 E 8028.26 S 9 17 E 8104.13 S 8 ~8 E 8179.47 S 8 11 E 8254.33 0.63 I .11 1.04 0.94 1.25 0.60 0.52 0.53 0.76 0.72 6406.49 S 4108.88 E 7610.92 S 32 ,%0 E 6483.23 S 4!28.14 E 7685.95 S 32 29 E 6559.83 S 4145.86 E 7760.13 S 32 18 E 6636.36 S 4162.00 E 7833.49 S 32 6 E 6713.70 S 4.177.26 E 7907.17 S 31 53 E 6792.19 S 4191.98 E 7931.63 S 31 /+1 E 6870.70 S 4205.98 E 8055.85 S 31 28 E 6948.99 S 4219.19 E 8129.58 S 31 16 E 7027.10 S 4231.61 E 8202.84 S 31 3 E 7105.07 S 4243.20 E 3275.67 S 30 51 E COMPUTATION OATE: lO-OCT-89 PAGE 4 BP EXPLORATION Z-18 (24-29-11-123 P~UDHDE BAY NORTH SLOPE, ALASKA DATE gF SURVEY: 06-OCT-BO KELLY BUSHING ELEVATION: 91.55 FT ENGINEER: COX INTERPOLATED VALUES FOR EVEN 100 FEET DF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR CODROINATSS HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST gIST. AZIMUTH FEET DEG/IO0 FEET ~EET FEET DEG MIN 12000.00 7802.85 7711.30 .52 2 12100.00 7863.77 7772.22 52 56 12200.00 7923.80 7832..25 53 17 12]00.00 7983.38 7891.83 53 36 12400.00 8041.74 7951.19 53 23 12500.00 8103.15 8011.60 52 43 12600.00 8163.86 8072.31 52 13 12700.00 8225.49 8133.94 51 39 12800.00 8287.85 8196.30 51 23 12900.00 8350.06 8258.51 51 44 S 7 38 E 8328.80 S 7 43 E 8403.76 S 7 37 E 8479.36 S 7 8 E 8555.14 S 6 30 E 8630.75 S lO 54 E 8706.39 S 11 59 E 8783.23 S 10 48 E 8859.18 S 9 35 E 8934.08 S 8 49 E 9008.73 0.81 0.51 0.30 0.88 2.11 4.16 1.39 1.62 O .68 0.74 7183.013 S 4253.97 E 8348.15 S 30 38 E 7251.62 S 4264.56 E 8421.26 S 30 2.5 E 7340.88 S ~275.26 E 8495.08 S 30 13 E 7420.52 S 4285.61 E 8569.16 S 30 0 E 7500.45 S 4294.98 E 8643.12 S 29 48 E 7579.26 S 4306.66 E 8717.37 S 29 36 E 7656.98 S 4323.17 E 8793.13 S 29 27 E '7734.17 S 4338.76 E 8868.04 S 29 18 E 7811.13 S 4352.47 E 8941.91 S 29 8 E 7888.41 S 4364.97 E 9015.54 S 28 57 E 13000.00 8411.93 8320.38 51 57 13100.00 8473.56 8382.01 51 50 13200.00 8535.80 8444.25 51 15 13300.00 8598.85 8507.30 50 30 13400.00 8662.83 8571.28 49 56 13500.00 8727.57 8636.02 49 35 13600.00 8792.16 8700.61 49 59 13700.00 8856.23 8764.68 50 30 13800.00 8918.98 8827.43 51 57 13900.00 8979.54 8887. ~9 53 31 S 8 3 E 9083.32 S 7 15 E 9157.80 S 5 49 E 92.31.28 S 4 32 E 9303.48 S 3 1,5 E 9374.31 S 2 4 E 9443.88 S 1 47 E 9513.21 S 1 54 E 9582.79 S 3 21 E 9653.~1 S 4 46 E 9727.25 1.21 0.58 4.33 1.17 0.99 1.12 0.91 1.27 1.83 1.68 7966.13 S 4376.48 E 9089.16 S 28 47 E 8044.16 S 4387.11 E 9162.71 S 28 36 E 8121.90 S 43'96.12 E 9235.33 S 28 26 E 8199.21 S 4403.15 E 9306.70 S 28 14 E 8275.8~ S 4408.37 E 9376.78 S 28 3 E 8352.01 S 4411.86 E 9445.67 S 27 51 E 8428.31 S 4414.49 E 9514.42 S 27 39 E 8505.06 S 4415.81 E 9583.54 S 27 27 E 8582.84 S 4420.25 E 9654.21 S 27 [5 E 8662.20 S 4425.93 E 9727.41 S 27 4 E 14000.00 9037.96 8946.41 54 57 14100.00 9094.37 9002.82 56 14 14200.00 9149.94 9058.39 56 1~ 14300.00 9205.51 9113.96 56 14 14317.00 9214.95 9123.41 56 14 S 5 55 E 9802.82 S 7 51 E 9880.38 S 7 51 E 9959.04 S 7 51 E 10037.71 S 7 51 E 10051.08 1.62 O.OO 0.00 0.00 0.00 8743.00 S 4433.50 E 9802.86 S 26 53 E 8825.01 S 4443.11 5 9880.38 S 26 43 E 8907.37 S 4454.45 E 9959.08 S 26 34 E 8989.73 S 4465.79 E10037.85 S 26 25 E 9003.73 S 4467.72 E10051.25 S 26 2-3 E COMPUTATION DATE: 19-0CT-89 PAGE 5 BP EXPLORATION Z-18 (24-79-11-127 PRUDHDE BAY NORTH SLOPEr ALASKA OAT:~, OF SURVEY: 06-DCT-89 KELLY 5USftING ELEVATION: 91.55 FT , ENGINEEr: COX INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASUREO ~EPTH TRUE SUS-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH BEG MIN EEG MIN VERTICAL DOGLEG RECTANGUL~R COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST OIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG MIN 0.00 0.00 -91.55 0 0 1000.00 998.68 907.13 8 39 2000.00 1925.93 1834.38 33 44 3000.00 2572.22 2480.67 54 25 4000.00 3149.55 3058.00 54 50 5000.00 3696.76 3605.21 57 25 6000.00 4247.46 4155.91 56 29 7000.00 4795.13 4703.58 56 51 8000.00 5344.07 5252.52 55 30 9000.00 5930.92 5~39.37 52 23 N 0 0 E 0.00 S 33 7 E 2~.90 S 33 57 E 380.58 S 35 17 E 1125.5.0 S 36 53 E 1930.35 S 37 20 E 2753.03 S 35 21 E 3575.00 S 34 42 E 4403.70 S 35 7 E 5231.16 S 35 11 E 6032.64 0.00 2 4.56 0.10 0.30 0.35 0.67 0.9,2 0.22 0.68 0.00 N 0.00 E 0.00 N 0 0 E 19.55 S 16.55 E 25.61 S 40 15 E 313.62 S 223.37 E 385.04 S 35 28 E 92~.60 S 666.34 E 1139.69 S 35 ,~7 E 3i 1581.73 S 1150.88 E 1956.12 S 35 2 E · 2247.79 S 1657.34 E 2792.73 S 36 24 E 2916.80 S 2155.37 E 3627.35 S 36 29 E 3605.10 .S 2632.05 E 4463.68 S 36 8 E 4291.09 S 3109.56 E 5299.32 S 3.5 56 E 4955.57 S 3572.01 E 6108.76 S 35 47 E 10000.00 6572.62 6481.07 49 38 11000.00 7190.33 7098.78 52 29 12000.00 7802.85 7711.30 52 2 13000.00 8411.93 8320.3a 51 57 14000.00 9037.96 8946.41 54 57 14317.00 9214.96 9123.~1 56 14 S 19 24 E 6794.79 S 14 32 E 7569.99 S 7 38 E 8328.80 S 8 3 E 9083.32 S 5 55 E 9802.82 S 7 51 E 10051.08 0.55 0.63 O .81 1.21 1.62 0.00 5656.60 S 3874.46 E 6856.28 S 34 25 E 6406.49 S 4108.88 E 7610.92 S 32 40 E 7183.03 S 4253.97 E 8348.18 S 30 38 E 7966.13 S 4376.48 E 9059..16 S 28 47 E 8743.00 S ~433.50 E 9802.86 S 26 53 E 9003.73 S 4467.72 E10051.25 S 26 23 E COMPUTATION DATE: 19-OCT-B9 PAGE $ Em EXPLORATION Z-18 (24-29-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF ~.SURVEY: 06-0CT-89 KELLY BUSHING ELEVATION: 9.1.55 FT ENGINEER= COX INTERPDLA'TEO VALUES FDR EVEN 100 ~EET O: SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MZN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 -91.55 0 0 N 0 0 E 91.55 91.55 0.00 0 7 N 51 16 W 191.55 191.55 lO0.O0 0 8 N 87 33 E 291.55 291.55 200.00 0 10 N 2 55 E 391.55 391.55 300.00 0 9 N 89 35 E ,491.55 431.55 400.00 0 20 N 31 36 E 591.55 591.55 500.00 0 13 N 41 39 E 691.56 691.55 $00.00 0 58 S 70 27 E 791.64 791.55 700.00 3 29 S 41 56 E 891.99 891.55 800.00 5 53 S 32 50 E 0.00 0.00 O-OD N 0.00 E -0.05 0.00 0.05 N 0-01 W -0.11 0.14 0.14 N O.OZ E -0.21 0.29 0.35 N 0.21 -0.29 0-44 0-43 N 0.21 -0.40 0.02 0.72 N 0.54 E -0.72 0.54 1.17 N 0.71 E -0.46 2.92 1.21 N 1.38 E 3.21 2.92 1.39 S 4.39 E 11-34 2.26 8.0A. S 9.25 E 0.00 N 0 0 E 0.05 N 10 37 W 0.14 N 10 4 E 0.41 N 31 i7 E 0.47 N 25 50 E 0.90 N 36 58 E 1.36 N 31 21 E 1.83 N 48 49 E 4.60 S 72 27 E 12.25 S 49 0 E 992.79 991.55 900.00 8 29 1094.35 1091.55 1000.00 11 48 1197.37 1191.55 1100.00 16 Z 1302.64 1291.55 1200.00 19 52 1410.17 1391.55 1300.00 22 59 151 8.37 1491.55 1400.00 20 53 1624.82 1591.55 1500.00 ZO 4 1732.52 1691.5:5 1600.00 24 7 1844.11 1791.55 1700.00 27 52 1959.10 1891.55 1800.00 31 50 S 32 54 E 23.84 2.36 S 35 19 E 41.35 4.09 S 36 35 E 65.69 4.59 S 36 49 E 98.01 2.52 S 3,5 26 E 136.96 1.34 S 33 0 E 177.89 4.45 S 3.3 3 E 214.18 1.80 S 35 26 E 253.77 4.93 S 36 25 ~ 302.56 2.38 S 34 13 E 35,3.62 4.93 18.65 S 15.97 E 24.56 S 40 34 E 33.23 S 25.94 E 42.1-6 S 37 59 E 53.19 S .40.42 f 66.81 S 37 14 E 79.48 S 60.08 .E 9'9.63 S 37' 5 E 111.36 S 83.38 E 139.11 S 36 49 E 145.49 S 106.60 E 180.37 S 36 14 E 176.20 S 126.32 E 216.80 S 35 38 E 209.17 S 148.84 E 256.72 S 35 26 E 249.11 S 178.03 E 306.19 S 35 33 E 295.28 S 210.99 E 362.91 S 35 33 E 2080.62 1991.55 1900.00 37 19 2212.08 2091.55 2000.D0 43 34 2358.26 2191.55 2100.00 49 4'9 2516.59 2291.55 2200.00 51 48 2690.92 2391.55 2300.00 54 36 2861.53 2491.55 2400.00 54 10 3033.22 2591.55 2500.0C 54 25 3204.60 2691.55 2600.00 54 36 3377.98 2791.55 2700.00 55 1 3553.45 2891.55 2800.00 55 3 S 35 39 E 426.94 S 38 5 E 510.76 S 37 2 E 615.26 S 35 50 E 736.27 S 34 55 E 377.40 S 35 5 E 101~..18 S 35 16 E 1152.22 S 36 4 E 1289.80 S 36 52 E 1429.39 S 36 58 E 1571.23 5.45 4.70 3.55 4.63 3.35 0.47 0.19 1.30 0.70 2.45 352.11 S 250.04 E 431.85 S 35 23 E 420.05 S 301.46 E 517.03 S 35 40 E 504.13 S 366.85 E 623.43 S 35 3 E 602.98 S 439.60 E 746.22 S 36 6 f ~ 719.44 S 522.12 E 888.93 S 35 58 E , 832.59 S 601.53 E 1027.15 S 35 51 E 946.66 S 681.94 E 1166.70 S 35 46 E 1060.05 S 752.64 E 1305.$9 S 35 44 E 1173.94 S 846.83 E 1447.50 S 35 4.8 E 1288.99 S 933.74 E 1591.66 S 35 55 E 3726.60 2991.55 2900.00 54 45 3899.47 3091.5'5 3000.00 54 42 4072.98 3191.55 3!00.00 55 0 4248.95 3291.55 3200.00 55 37 4428.16 3391.55 3300.00 56 45 4614.92 3491.55 3400.00 58 12 4802.90 3591.55 3500.00 57 54 4990.31 3691.55 3600.00 57 29 5175.36 3791.55 3700.00 56 56 5358.00 3891.55 3800.00 56 42 S 36 37 E 1710.51 S 36 35 E 1849.48 S 37 10 E 1989.07 S 36 57 E 2131.46 S 37 9 E 2277.82 S 37 41 e 2432.8I S 37 21 E 2589.17 S 37 19 E 2745.00 S 37 23 E 2898.02 S 37 3 E 3048.32 0.63 0.40 1.10 0.60 0.72 0.51 0.39 0.86 0.66 0.55 1402.53 S 1017.94 E 1733.00 S 35 58 E 1515.90 S 1101.80 E 1874.01 S 36 1 E 1629.38 S 1186.81 E 2015.78 S 36 4 E 1744.74 S 1274.32 E 2160.56 S 36 9 E 1863.5:~ S 1363.70 E 2309.26 S 36 1Z E 1988.92 S 1459.45 E 2466.94 S 35 16 E 2115.13 S 1556.44 E 2626.08 S 36 Z1 E 2241.29 S 1652.38 E 2784.56 S 36 24 E 2365.03 S 1746.90 E 2940.24 S 36 27 E 2486.76 S 1839.32 E 3093.07 S 36 29 E COMPUTATION DATE: 19-0CT-89 PAGE ? BP EXPLORATION Z-18 (24-29-11-12) PRUOHDE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 06-0CT-89 KELLY BUSHING ELEVATION: 91.55 FT ENGINEER: COX INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST OIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET' DEG MIN 5540.40 3991.55 3900.00 56 40 5720.33 4091.55 4000.00 55 55 5899.22 4191.55 4100.00 56 13 6080.24 4291.55 4200.00 56 47 6262.69 4391.55 4300.00 56 30 6444.84 4491.55 4400.00 56 40 6627.73 4591.55 4500.00 56 55 6809.91 4691.55 4600.00 56 53 6993.45 4791.55 4700.00 56 50 7177.50 4891.55 4800.00 57 14 S 36 49 E 3199.46 S 36 37 E 3345.81 S 35 45 E 3492.13 S 35 7 E 3541.31 S 34 37 E 3792.38 S 34 30 E 3943.24 S 34 38 E 4094.95 S 34 32 E 4245.83 S 34 42 E 4,390.28 S 34 44 E 4551.30 0.71 0.47 0.41 0.33 0.38 0.26 0.04 0.93 0.68 0.82 2608.74 S 1930.92 E 3245.61 S 3.6 30 E 2728.80 S 2020.13 E 3395.18 S 36 31 E 2848.54 S 2107.66 E 35~3.51 S 3,6 30 E 2971.59 S 2195.00 E 3694.37 S 36 27 E 3096.80 S 2232.22 E 3846.91 S 36 23 E 3222.29 S 2368.46 E 3999.09 S 36 19 E 3348.45 S 2455.24 E 4152.14 S 36 15 E 34'73.92 S 2541.52 E 4304.35 S 36 11 E 3600.59 S 2628.93 E 4458.20 S 36 8 E 3727.66 S 2716.84 E 4612.65 S 36 5 E 7361.67 4991.55 4900.00 57 2 7545°08 5091.55 5000.00 56 55 7727.43 5191.55 5100.00 56 29 7907.06 5291.55 5200.00 55 42 8083.39 5391.55 5300.00 55 8 8257-31 5491.55 5400.00 54 36 8429.26 5591.55 5500.00 54 1.~ 8600.37 5691.55 5600.00 54 2 8768.91 5791.55 5700.00 53 8935.17 5891.55 5800.00 52 47 34 50 E 4704.43 34 45 E 4856.65 34 54 E 5007.64 135 ~ E 5155.30 35 7 E 5298.98 3,5 ,6 E 5439.77 34 52 E 5578.20 34 38 E 5715.'70 34 22 E 5850.12 35 3 E 5981.68 0.37 O. 85 0.45 0.48 0.07 0.42 0.20 0.34 0.56 0.40 3854.65 S 2B05.11 E .4767.28 S 36 3 E 3980.89 S 2892.86 E 4920.99 S 36 0 E 4106.15 S 2979.82 E 5073.44 S 35 58 E 4228,36 S 3065.45 E 5222.65 S 35 56 E 4347.17 S 3148.98 E 5367.86 S 35 55 E 4463.60 S 3230.80 E 5510.15 S 35 54 E 4578.19 S 3311.01 E 5650.01 S 35 52 E 4692.31 $ 3390.10 E 5788.83 S 35 51 E 4804.16 S 3466.87 E 5924.45 S 35 49 E 4913.44 S 3542.38 E 6057.25 S 35 47 E 9098.64 5991.55 5900.00 51 45 9257.65 6091.55 6000.00 51 1 9416.87 6191.55 6100.00 50 29 9571.83 6291.55 6200.30 49 7 9723.69 6391.55 6300.00 48 37 9875.65 6491 .55 6400.00 48 59 10029.26 6591.55 6500.00 q. 9 4.5 10184.21 6691.55 6600.00 49 39 10339.56 6791.55 6700.00 50 25 10500.00 68~)1.55 6800.00 52 22 S 34 16 E 6109.63 S 24 3 E 6232.96 S 21 1! E 6355.42 S 20 33 E 6474.17 S 19 46 E 6587.70 S 19 39 E 6701.26 S 19 25 E 6815.93 S 18 55 E 6'934.29 S 17 53 E 7051.90 S 17 31 E 7175.80 3.27 3.86 0.90 0.61 0.25 0.25 0.39 0.58 1.74 1.24 5019.28 S 3616.67 E 6186.55 S 35 46 E 5127.20 S 3676.59 E 6309.15 S 35 39 E 5242.07 S 3722.97 E 6429.60 S 35 23 E 5352.68 S 3765.12 E 6544.26 S 35 7 E 5459.96 S 3804.49 E 6654.72 S 34 52 E 5567.73 S 3842.9S E 6765.21 S 3~, 37 E 5677.65 S 3851.S? E 6877.84 S 34 22 E 5789.39 S 3920.91 E .5992.19 S 34 6 F 5902.19 S 3958.41 E 7106.68 S 33 51 E 6021.72 S 3996.54 E 7227.27 S 33 34 E 10667.62 6991.55 6900.00 54 2 10836.38 7091.55 7000.00 53 17 11002.00 7191.55 7100.00 52 28 11164.95 7291.55 7200.00 51 47 11325.76 7391.55 7300.00 51 48 11490.40 7491.55 7400.00 53 10 11655.86 7591.55 7500.00 52 33 11819.38 7691.55 7600.00 52 1 11981.65 7791.55 7700.00 51 56 12146.17 7891.55 7800.00 53 5 S 16 55 E 7308.46 S 15 55 E 7442.18 S 14 31 E 7571.54 S 12 52 E 7696.90 S 11 21 E 7818.68 S 10 28 E 7944.47 S 9 33 E 8070.71 S 8 39 E 8194.01 S 7 41 E 8315.14 S 7 43 E 8438.62 0.41 0.70 0.62 0.97 0.97 0.49 0.65 0.77 0.74 0.53 6150.23 S 4036.2,3 E 7356.42 S 33 17 E 62:10.64 S 4074.64 E 7486.59 S 32 58 E 6408.03 S 4109.28 E 7612.42 S 32 40 E 6533.00 S 4139.82 E 7734.22 S 32 22 E 6656.17 S 4166.01 E 7852.40 S 32 3 E 5784.63 S 4190.59 E 7974.47 S 31 42 E 6514.45 S 4213.47 E 8097.09 S 31 21 E 7042.20 S 4233.92 E 8216.98 S 31 1 E 7168.70 S 4252.05 E 8334.88 S 30 40 E 7298.16 S 4269.51 E 8455.29 S 30 ZO E COMPUTATION D,~TE: 19-0CT-89 PAGE 8 BP EXPLORATION Z-18 (24-29-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY= 06-0CT-89 KELLY BUSHING ELEVATION= 91.55 FT ENGINEER= COX INTERPOLATED VALUES FOR EVEN 100 FEET Om SUB-SEA DEPTH TRUE SUB-SE& COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAS'T/WEST DIST. AZIMUTH FiEET OEG/IO0 FEET mEET FEET DEG MIN 1231).77 7991.55 7900.00 53 37 12480.87 8091.55 8000.00 52 40 12645.04 8191.55 8100.00 51 59 12805.92 8291.55 8200.00 51 24 12967.07 8391.55 8300.00 51 39 13129.06 8491.55 8400.00 51 39 13288.53 8591.55 8500.00 50 32 13444,69 8691,55 8600.00 69 38 13599,05 8791,55 8700,00 49 59 13755,92 8891,55 8800.00 51 11 S 7 0 E 8565.58 S 9 55 E 8691.80 S 11 30 E 8817.55 S 9 32 E 8938.50 S 8 I3 E 9058.81 S 6 54 E 9179,29 S 4 60 E 9295.29 S 2 41 E 9405.42 S ! 48 E 951.2.55 S 2 36 E 9522.24 0 - 9'7 4.21 0.91 0.64 1.35 1.09 0.97 1.57 0.93 2.10 7431.51 S 42.~6.99 E 8579.37 S 29 59 E 7564.28 S 4303.96 E 8703o0Z S 29 38 E 7691,76 S 4330,40 E 8826,98 S 29 23 E 7~15,69 S 4353.Z4 E 8'946.27 S 29 7 E 7940,52 S 4372,83 E 9064,96 S 2~ 50 E 8066,82 S 6389,92 E 91~3,95 S 28 33 E ~190,38 S 4402,46 E 9298,60 S 28 16 E 8309,81 S 4~10,15 E .)407,57 S 27 57 E 8427,5~ S 4414.47 E 9513,76 S 27 39 E 8548,37 S 4418,49 E 9622,77 S 27 20 E 13920,23 8991.55 8900,00 53 46 14094.93 9091,55 9000.00 56 14 14274,88 9191,55 9100.00 56 14 14)17,00 9214,96 9123.41 56 14 S 5' 3 E 9742.)6 S 7 51 E 9876.)9 S 7 51 E 10017.95 S 7 51 ~ 10051.08 1.38 0.00 O.O0 0.00 8678.43 S 4427,31 E 9742,49 S 27 2 E 8820.83 S 4442,53 E 9876.39 S 2b 44 E 8969 04 S &662.94 E19018 06 S 26 27 r- 9003.73 S 4667.72 ,_10051.25 S 26 23 c SCHLUMBERGER O t REC T I ONAL SURV E Y COMPANY BP EXPLORAT I ON WELL Z-18 (24-29-11-12) FIELD PRUDHOE BAY COUNTRY USA RUN ONE DATE LOOOED 06 - OCT - 89 REFERENCE 73S20 WELL' "Z-18 (24-29-11 (984' SNL, 1996' WEL, SEC 19, TllN, R12E) HORIZONTAL PROJECTION NORTH 4000 REF 79S20 SCRLE : 1/2000 IN/FT ~:~i~.`~.:.."!`~...L-t~...L~L.i....~..~!....L..~..~..~I~.~.L.i~.~i:~..~;...Li~...i....L~.L.~:....i....i...~i ........ L..!....L..!....L.i....i....L..! ........ !....L.i....i..-;....LL.!...i....L..i....L.!.__!__f::~:..:._:~:~::::~7.~..u:. zooo :T"!"T"i"TT"':'i'"'i'''~'''',''''i''''i''''',''''i'''i''''i''''i':'':f'''i'''':''i'''i''''i ....... i""i ....... i""i"T"i'"'i'"'i'"'i ....... i ........ i'"'i""i'"'i"-i'"'i'"'i'"'i'"'i ....... i"T'"i'"i'-i:-:-i ....... [ T-i-:[?-:?i F :i~'i ..-~.....;...,~.....~ ...... u...;....;-.-.; ........ ;....;....; ....... +....~ ........... 4 ....... ;..-.;.-.-;...,L..t-...;.-~ ........ ,- .......... .; ............ ~ ........ .L..?....;. ....... ~....p._.;..,.; ....... ;....; ............... ;....;....;....; ....... ~..-~....P..4 ....... ;--;--;-4 ............... ;--: ....... ;-_u_~. ....... .... ~-...t...t...L.I..-!..-.L-.~,... ,L. ~-...t...L..!..-.!....!...-t...!....!.-..!.-.I...-~....i... ~... ~... ,~..-.t.-i... ~....!-'~... ~..-~....!....i....~....~....~....!... :,, ....... ~..-.t...i....L-I.., .i... !....~....~ ...... ~....;... :,.-. i..-.I.- .~-. .L..!.-.t ....... ~,._~_. ~_..b.!__:__i_. :,-~ ....... i-. !-..~-.:-.~-. .... ~---+--.~-.+--i..-i-.-.~-.-.~..--:. ....... ~--.~....~....~....f...i....~....i..-~ ....... ;.-.>.-~...~ ....... .t ~....i...~...q:.:4....-~...~...,.'.-..f..~...~...~...~ ....... ~.-'~..-'~.'-~,-t~:...+.'-:.'.~ ...... ~+"-~--.~...-~..+'.~...~."~ ....... ~-'~'-'~-'~--t-+-~-:-'~ ...... I.--i.'-f.i.-i---?.-i.-i-.'?'-i---:-.i--..i...i--i---?-+.-i.--f--'i ....... ~'--f-i-'i"-t'--i"i'-"i'-'! ....... !--'i"i-'"r-i"i'+-'i ....... i---!'--..-:"i'"?-"'i'-i'+i ...... i-i--i"i"l'+i"i"-i ....... ?"i-"-f-i-:!?i-i ...... :-.,'-"i---?'t, ...... !'"i'"'.~"'f ....... i'"f"?-'-i ...... t---Y"i'"'! ....... r"r'-?-i--'""i'"',~-'+'"fL ki'"i'"'!-i"'i-'-'.,'"'i'"'r'-~ ....... r--i--'-r"~ ...... i'"i'"~'"',, ...... ~'"'r"t-"f'-['"',.'"'!'"~'"~ ....... i"'i"-F: ....... F-!-i"-~ ....... · .-:--.--..:.-.~--....'---1-.-i.. ?.'.-.-i---,:--.,--.-.:.--~---~-.-?..-I...?-.-i---?-..-~ ...... ?-i---?----i---t .. i----i----~--?----~---i.--.i-.-i..-~---i--.i...~--i.--? ........ ~---.~..--i---:....i-.-~-.-.~....!.-. :.-.~.-...: .,.'...,.-.-..:...:.-.-~ .... ~.-::~..I-:: ~.-i- · ~:.~.?~ ?i :[:-t-:::t:::t 't::! i i:i::: i i ::t::t::i: !::::t i;:i ::::~:::i t:? :j :t ?:::~ i !::i i ! ::!:::~: t 't::'t: i t:::i::~: !:: t:i::::::i::! ~:::i:::I:::~ :?::::~ ::i:::!;:'t ::::::::::::::::::::::::: :::?t":!::]'"t'"t'"'~:'-~ -'.r"T"?'"':"~ '-.r"?'"',r'"T" r"T"?'"'!'"? ........ T"'T"'?'"? ....... ?:'"'F'T"?'"f'":'-~'"?"",~ ....... ; ?'"T"-'~ ...... .:'"'?'-:.'"'? ....... :"t"'T"T-, "?'"?,'"'?'"?, ....... ?"'T'":-? ....... ,r"T"-:"l"'l "-.r-T-T-: ...... :",r-T-I ....... ?"'T-,,'-I ...... --:.---.'.--;..-,.:--~..-~.-~--~.-'......~-..~-.,:---~.-?+-..*---...'.--.;---~; ...... ~-.?'--.~--,.'--.~.~-?.'~--::--- :~i:..,;.--1::--.;-.-~.-.-.;--'.. ...... :::.--~.-~ ...... ,?;'--.*.-...-?:-..~-.-f.-~--.~...-;..~--'l'-?.-?.:-~.-~--?'.--.*--..: ....... · '~"+"i"'f''i''-f''?''i'''! ...... !'"f'"i"i'"f"i"'i'"i'"i ....... i'"?'i"'i"'t'"?'-i'"?i ..... ~'~-'~O0~'"f ...... i"'f"i'"?'"f"f"f"~ ....... f"i"i'"i""t"i'"f"!'"i'''~''h''!'''?i''-t''-h''h'i'''i ....... .--~---;---;-,-~..-~ .--;-,.$.--~,-.~ ....... ~-..g-..x --~.--~-.;.--&-..g--4 ....... ~--~---$-..4 ....... ~--~~--.~---; ...... ;..-;.-,g---+ .... ~---~,-,$,--~ ....... 4-,-~.-.~...& ...... ~...-~---$...$ ....... ~.-.$-,4--.; ...... ~'"$"~'";'"t "-~'";'"';'"~ ....... ;'"';'"~'"; ....... ~'";'"$'"'; ...... ~"'+'"~"-; ...;.,...,., ....... , ....... ,..., ...... ,.,.,.,.i...,...,.,..., ....... ,...,...,..., ....... ~..~...,..., ...... ~...,...,:~...~:..,~t~1..,...,...~..., ...... ,...,...,..., ....... ,...,...,..., ....... ,...,..., ........... ~...,..., .......... ~...,...: ........... -2000 ..-~...L.L.L.~..~...L.L.~~ ...... L.L.LJ..-.'.-..L.L.L.~,, ....... t..L.L.L..'...LJ...L.L-L.L.L.L.~, ~ ~ ~ , , ~ ~ ~ ~,~: ...... ~"'~'~.~' ~;' ~'"~'"~ ...... ~'"~"'~'"~"?'~"~"~I ? '~ ~ '~ '~; _.A..L.L.L.~ ~ t"-L'L'?~' ~ .... ~i-'L'Tt , '~ .i A..t ? .'.::: ::~: : : : : : : : : i::~ :::: : : : : : : :z : : : : : : ; : : ; ~ ~ ~ -'~' --:i:: · '-:'"?"?"'~ ........ ....... t"'?"'?'-? ...... [ ?"?'"?'"? ................ ....... ?"'?'"?'"? ....... :"?'"?"'?"- "W'-h"?"? ...... t ~"'?"'?"'? .... ...... ~ :-~!?"'? .... ~'"~ ~'"'? .... ...... t ? ............................ ' ~'"~'"? ..... ~'"?"'?-? ...... ?' :- :-' i ? , . ?' ' r ?-? ....... ? ~- ~-4, ..... '-:~"???"] '--r-'?"?'"? ....... ?'"?"-?-? ...... ?-'~"?-? ....... T'"?"'i'"'?"'1 "?"-?"'?'"?"' r'"?'"r"?"'*'"i""~,'"?"'?- .~- '"?'"?"'?'"?"' r"?'"?'"?'"? ...... ???'"? ...... ?'"?"'?"'T ...... .~'"?"-~'"T'" ..-r.--r.-*....?.-:-r-?r-? ..... ""~"t,! ~":! -'~''''~' '"'~""~ "-' --4--4---4-.- 1'%"4-'4'"4'"41 ....... ~'.-.4---4---4 ....... ?' ---4---~'-,.4---,! ..... "4-'-~'--4---4 .... ...... ~'--.4.--4--4! .... .... "~ ~ ...... ~.[' , i'4'"' .... ~r~, ~4,_.4 ' ~1~..-' ...... i' 4-"$ ....... 4--.4...4---~'l ...... 4".'~--'1 '~ ' ' ""~" ......... - T'~ ~,~' - '.--' ......... -Fi' .-4... J~.-~. ....... t',.4'---$...~ ....... 4-..4..-4-.~--.. · . ; ~ ~ ? ; : ~ : ; ~I ; t . : : ~ ;;; : . ! , , i_~_~ ; : , ' ' ' , .... ~: , , .... , . ' I I . ! . ' . .' ' · I , · ' ' ..... ................ -~ '-, ~ ..... --,'~ ................ -, ......... --~-.?.~-???..,..~..?.?-,.,....??.?..~.-.-~_.~.-,...., ,.-.-,-,-,.-, ,-~. ,-., ,.-:-?~..~,~,-?.--~-.,-.-~?.,...,.- .-,...,..-,-~,-:..,...: ...... ?.,_?_? .... ? ..... ..~...~`...`~....~...~..~..~.~.:...:...i.~.~....~....i...`~...~....~....``...~..~ ........ ,,..~...,.,...~...~....L.,:...:...: ...... ~...~...?'..,~...~....',...~...~..~.._.....'...~...~..~..~uuu.,;...~ ...... ,'....,,....~...~ ...... ~...~...~....;...~,.-~...:...~....t..-l.:-:-'--; ........ "~J-&'~-... ~, ~ ............... t"~"4'J'J- .... t-~"~'"'*-~'"t~"~J'"L~ ............. ..... ~.-L.t.4...4-4.,L~.-L. I~"'~A-L-L~-'~'-L'L'&' ..£A...~...!.-N~..-t ...... 4...~-~.-.~. ..... ~.-4--~'-&-, .-.L-L.~.4.! ...... ~..~4...4.-L- .... ..£.~..4-~' ....... ~-L! "~l-J ...... .... ..... -.,r--~---?.--? ..... ;-'.*'"';'"'i ....... :'"?'-'r-"t ...... ?": ....... ~"'~'--'r"?-;'"'.~ ....... :'-t'"?'?"' !'"';'"~'"?"?"'~'"'~'"?"'?"'~'- ~';'"~;'"'i"? ...... i'"121~I~1;; '"?"":""i ........... r"'-;-"r'"'~ ...... r"T"'?? ...... r-'.' ...... ~ ...... %' r-;'--r- · --~-*.',--- ,*--?--~---~-T--~--~, ...... i--?-'-r'-T-?'-'?- ~:"T"'?-T'"*.. "~-?"'r"T--t"-t-T'T'' '-?'%'~'?']~'?'*.. "~"'~'~ "'~+"'~"'f'~'f "? ...... t"'*,"~"'?'-['"T'"?'"r'~"'t'-?"?"'*.,'"?"t'-r:" .+'"~,"~'"] '"T'"~'"*:"?'"~'"~'"T'"*..-f -~ -+'+"~'"+-!"-!"+'+"~ ....... f"+'+'+"f-f-+'+'-f'"f"~"'f-f"?"f"+'!-+"+ ....... ~"+'+'+'+'+'+'+-~:"~'-?'-+'-?"+-~f-~'"~= mi-~iT':"+'+"i"+-!'"f"~"-?"f-'f-f't"-.~"f'-~'"f'"l'''r'+''f'''ff'''f''f''f''f'?'' · --~-.?--f..~.-j-.-f-.-.,--~.--.. ....... v-f.-.~...,:...-J-..?~..-?'-.i ....... f--,;.--;..-,;.--~-.,:..i---v-,; ....... ?-;.--f---t..-F.?-?f..*;.-,..-+.--,.:.~.-.v~L+..,.:--~\J ...... ~...~.:."t..+..~...~..+.++.j"+~.?'...~...~;...[~F+..~...~;...~...*.....~...`?~...j.~.r..~;...H ..-~...~...4...4...4.-:~.-.-~.,.4.,,4 ....... 4,,.4....4....-~...$...-L..-~...4.-...~ ....... 4....;-.-.~-,,~...4.--;..-~.---~-..-,; ....... ~...4...-~.-4.,.~,.-4---.~....~...,~... ,..~.-.4...4. ,..;,-L .,-~...-~ ..-.;...~ ...... 4.... 4.... 4... 4.-...L...:... ;.... 4... 4-.--~,.-~.., .~.---::.-4.. A.--;-...~--..-.;...4-.-.,~.,. 4.... ~...4... 4. .-. ,t... 4... · .-i...,:...~.--~---~..-i-.~-.-~...; ....... ;...;:-.;..4...L.~...~...;...,: ....... ~...;....~.4.-'.:~.-i...,:-..; ........ ~...;:...~:...;...'...;...;.-.;..-.;: ...... ~:..-,~...;.~.:...,:...;..-;...~ ;...~ .... ~.~@' u>-..i...;...i...'...-;...;..-~...;,.. ..-;.-~...;...~ ..... ~-~..~.--; ....... ~-.-~-..;...~..- .-~...~...~..+: ....... -:'...~.--,:.A ...... ~..~...;...~ ..... ;...;...~...; ..... ;...~...~...; ...... ~...;-.~...;....}...~..-~...,:...~ -..;...~....;...; ..... ~.-;...+...~ ...... ;...~...,"...; ...... F..,"..4..~ ....... ~.-;-.+.-;: ...... ...........................~ t .,..~..--F..~.-.~.--.;-.,-:I ....... ~-.-,;.---;.--~..-i.,--~-,.;.,--:,--~ ...... ;-,.4.....~...- ........ ;---;,...;,,,,~ ....... i,..,; ,..4..,,~,--,r--i--,~;..,,:,-,-it ........ i,.,-i.,.~.,+.-r,.-i,,+.+.-i.-,t "-:'"??'"? ....... :'"?'"':'"? ........ ;'"?'"'!'"? ........ r-'~"'?'"~'"i'"r"r"?"--..' ........ ..'"-!"'r"~ ...... ~:'~'"'..' ........... ~ ~ ~ ~1~[i0~ . . ~ "-:?'"?'? ....... :'"?"'?. ...... ::'.'.'"':?":..'"'"? ....... ?"'::.'"'::?"-.?'? ...... :::'":.' ...... :.'"."'.'."'"? ....... :?"':'"?"T"?":?"'? ...... ...~ :':?"':'".'.."':r ...... ::"'?"? ...... :?: ...... ?::: ...... :"T'"T'"T ....... ["T"T"T ....... T'"T"T"T""F'T'T"T'"'~ ...... T'"T'"T'"T"I'""F'-FT"T ...... T'"T'"T""T....'"'I'"'F"T"T'"~ ........ F"T"T"T"-~'"'["~'"F"T'"F'"I'"T'"T"T ........ i'"'F'T"T ...... :"T'"T'"':-~"-!'"':T"T ..... T"'T'"T"'T'"F'T"'T'"T"T" ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::: ..-i-4...~---H..-i...~-.-~.--.~. ....... ~---,'"...~...-~ ...... ~...~--.~----i--.t...~-..~---~--..i-.-~..-i..-i....~.-.;' ..... ~...,'".-.~..4.,-t-..~-..~..4...~ ....... ~...L~...~..~...~...~...~...~ ....... [:~;..i...~...~..:....i...i....i....i~ ....... i...~..>4 ....... i--iA-: ...... ..-i..+-+..~ ..... !.--~-.-~---; ....... ;..--i-.-;--.;...i-.-~.--~--.;...-!--.,.--~--.~-.-~.--~.-+---;.--~...~---~ ...... ;..-~-.-;-.-~ ...... ~---;---~...~ ....... ~...t..~...~..T..?,....~..-~. ...~..'....i.: .~. :...~....; ....... L.;...;...;....t..-;..-~-.t-~ ....... -8000 T ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ ~ ~' :Yg'u . ! :. ! !. ! ! '. '. :. :: !, i, ! ! ! ! ! ! ! ................... ,,,, t., : , ,¢0 ....... , , , , · -~,,.. ~ ....;,.- 4... J, - -~..-. 4 ... 4- · 4 ....... 4... ~... ;,-- ..4 ... +.--4-..4.... 4-..4 ...... ~...4...4..--.4--.4....J.,-L..4..-4- ...... 4-..-4-..~...4..~...4-..4..-4.-4- ....... .;.-.4..-,-;-...;,..-!.-,.4-,.-4....4.---;,. ...... 4. ....... 4...4..-~....;,....;... 4...., ....... ;...,.-.4....; ........ ;,--~--~.-.4. ...... ;--.;.-.4. - -~ ....... "-F-:-'::::::~ ....... ::::?:"'::'"~'":'":?r"::?:-*... !- .?':-'?::? ...... ?:"-:?:':':-'-:'"x:'"¥:~'~'~'~':~ ....... :':'"::::::'i ...... .... !..-:.:..4....i--.[--.i....i----i--.-.'. ....... i....i...*.:....i...!....!....i...i....~...~.4...~...~...;...i....~....~...~...; ....... !---~-..;:---!----[--.-~...!.-.-!.-.; ........ !..-~---.~..-i..--[-.--i-..~ ....... -Li-4...i ....... i....! ....... ~...~.4 ....... i-i-! ..... i4-+~-~ ...... .... i---'!'"'!---?'-'i"'i----i----i-'--! ....... f...?....!...?....f....h..i...~....h.1...i....i....!....!....i....i....!....!....i ........ i'-'-i'-'-i'--'?'-'i-"'!'--!"--?'-i ........ i-.--i-..i.---i--"i'...?---h"f"'~.., h'-?'-f-'"?"-~-'i--i-'~'4-! ~ i'?-?-i-?-?-':-'i ...... r !'-i--i-i-? "-i'"!'"'!'"!'"F'-'!'"f"'!"'i ...... i'"!'-'!-"!"T"i"'i'"?f"'t'"!-"!"+"i"'?f""h+'-i ....... i'"i"'i'"?'":'-i'"i"+'! ........ f"-f'-"h"h-~"-i"'i'-'!-"~ ....... i'"'f'"'~'"~'"'~'"'~'"i'"'i"~ ........ ~-:-t-+4-? ........ ?-? ..... _ 100or'"-! ........ F"T"T"7'"':"T"T ........ F"F'":'"FT"? ........ !'"? ...... ?'"'F'"F'T"'~'"'F'-?F".~ ........ F'"!'"'F"T'"F'T"'F'"~ ............ :'"F'"!"'? , ~ ~ ~ ~ ..... !'"'!'"'!'"':'"F":'"!""F-! ........ :---:-?""F:--..'--F-: ....... "-,."'" r "*.. - '"... ....... F"f'",'t.'".'r ...... ?-'-'t'--r-'?-'-r--.,'f'--?"-T-'-? ...... T'"'f'"'f'"r ...... 'f"'?"'i'"'T ....... f'"T"?'"~ ...... ..'"'?'"t'"'f ....... .?'"T-'F'? ...... I'"'?"-F'; ....... ?"'!'"'T"':'"f'"T'" :r"~"'? ....... ["?'"?'"? ........ ~'"'["~'".? ...... ?' :'f'"'~ '": ..... T'"?" :T""~ .... ?-.-..'---.i---+---I..-.i.---i---.:., ....... ??-?.-.?.--t---?----!----i---~ ...... -.:---?.?.---.?--I-.--i.--.:..--.-~--.~ ........ ~---?-.--i--.?4---.i----?.?.-..i ........ ?-.~.-.?..----4-..?.--?--.-?-..?..:?.'?--?..?.--.~'-:-?:--~ ..... ::..,-.,4. :,-:~ ..... ,..-:-~ ........ ~.-.~..-~ ........ ~--.-~ ........ i ....... ':-'-~-.-4.---;--'-P--~.---~.--~,,--P.-;---~,.--~---+,---~.---~-'-';'-"~'.--~-"-~ ............ ~.- 4.--';----~ ....... ~'-'-;-..; ....... ; ............ ;'--'~ ........ ~-"4.-"-~ ........ i.-..i.---i--.-!.--.~,-..r.-i--i-~ ....... i-~--i, .~--~-;-.~--r-~ ...... ~--~.; --i...L.L.L.~....L.~.-i...~ ........ i...~...t..L.~...~-~...~..-i... ...L.i,...~...~...~._i....L.~...~ ....... ~...],...~...~,..4..:~...~...L.~ ....... i......i..4...L-i...~...4....i...4 ........ i,..~....~..+,..i....!...~....~....! ........ ;....~-+ 4-4 ........ !-+-~ ....... ..... ~...i ....... ~...~....~....~....L...~ ........ ~...~...~...L. '...~....L...L..i.., :...~....L..~....~...I....L...L.,~...~...; .. :....L..~....i....~....L...L...L...~ ........ L...~....~....L...~....~,..!..~... i ...... i. ~ ~ .L ~ ..... L.. ~..L...~ ..... ~ ...... ; ~--~--i-. ....t"~'"q'"~ ....... ~*"~"'~'"~ ...... ~"'~"'~'"~ ....... :;'"~"'~'"i'"';"'~'"~'"i'":'";'";'"'"'"i ...... i.4....L.i ....... ~...!...~...~ ...... ',?....i...!..~ ....... i. 4 i.i i.i i ~ .. ~ ! ~ it-iii-i ; i ~ ~ I ....... ...... ........ ....... ........ ........ ..;i ~.i-_~ ~ ~ ~ i_~ ~ ~ i--~ i ~ ~ ~ .~ i ~ i ~ ~ L i ~ ~.! ~ ! -~ i i ~ ' ~ ; ': ~ ~ ~ ~.; ~ .... ; ........... ;....~...~....; .............. ;...~ ........... SOUTH-12OOr ~i~]i~ i~~ ~]~i~ i~!~]~::~, ~,:~I,:::~'~:,:.:I ..... : I.~: :~:~1'~:,, -6000 -4000 -2000 0 2000 4000 6000 8000 NEST ~RTICAL WELL' Z-18 (24-29-11 12, (984' SNL, 1996' WEL, SEC 19, TllN, R12E) PROJECITON 333. -2000 0 0 2000 4000 6000 8000 I0000 !2000 14000 153, .... , , , ~ j ~ : i ~ : : : : ~ ! ~ ~ ~ ~..-~ ..4...4....i....-,-.-4 ..... 4....~...4.....~ ....... ~-..~.-.-,.-.? ...... ',.-.'r---'r'"'- ...... ; ~ ..... !....L..i....i ........ L; .;....~ ...... -L..~.-.--!--..~.--L..~-.-.!--.-~..-.;.-"i--'?i'"i"-f'"'""~'"? .......... F'"F"'Y'"~ ...... T"7 ..... T L..i.._L._t...'...; ~ .i...~ ..... ;.--;...?, ...... ;....;..-~..-.; ...... +...~...~-..~...~-'~" `...~....L.~.~..~..~.~.i....~..+...?..,~~:~`::::::::::::::::::::::::::::::::::::::: ........ t....~....;....~...-~...;....~ ...... ~.--: · . ~--..?-'-~---'~"-,---~""t""~"-'~'" ~~;¢;~,...;...;...;...~...~...~....~....~...;-.-:-.-~--+-.~--..~..i-.-~.--~ ...... ?'"'~:-"~'"?'"'~""~'";' ~~'. :: :::::::::::::::::::::::::::::::::::: ~-~---.-.~'::'~"i"i"?'t'"t" ~:~~:~;:"~'"~ ..... · -~~ ~;;-~ ~,4 ....... ~,...~.-.;---~---~---;...~ ..... ~ ....... ~..-~.-.-~-+-~---'~--+-'~-"?',~~::; .... ~""~'"~"-'?'i'-'~'"'~"'f'"'~ ...... ~"'Y"?"~"-r"T'i'"Z~Z.. ~Z;'[..;...~...~...~. +4 ....... L..L4---~ ....... ~.--~- -.~ ........ ?-'~----Y'i'"?~"i'"~""~ ....... ~' ~"i'"i"'I'~:Z]:]Z~... ::: ::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: ...... ~--.~.--~.-.~-.-i~-i ....... !'-i--"~--"?+'i'"t ::::i:::::::::::::::::::::::::::::::::::::::::::::::::~:::~:::.~:::~::: :..-~...L.~....~ ...... ~...~....~.-.~ ...... '., ~~:. ~::~:::~~,.---~-..~-.:;:::;:::~:~:::~ .---?---~'-'~---~---~'i'"j:::~:::~::~: ::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::: ..... :::::::::::::::::::::::::::::::::::::::::: ~~~~ '';: ;~., ~~....~... ~ i _L.. ' '...'...4 ..... ; ~...~..4...;...~--.~...~...4 ...... ~'"~'".'"t ....... ~ .... -~ ...... ~ ~ ~ i i , ~ i...'...,...L..4...4 ...... ;...;...4...~..-.~-?ffy"t .... ~.....%..-~ ....... ~ % ? ~ ! ; ~ ~ ~ ~ ~.~ ...... :...,...~...; ....... ; ..... ;..-4-.4 ...... 4...4--4~....~ · · '~ ...... t'"?'t'"t t ~ : : ; ~ ~ ~ ~ : t : : : ....... ~.. '.-~ ..... '' .'* ~ ~"t ...... t"?"t"t ~ ~ ~ : ...... :::::::::::::::::::::::::::::::::::::::: ....... ' ::t'-t'"?'~ ...... T;" ~: ?]::~:~:::~:::::~:~...~-f' ~'"~'":"~-+"i'+'~"+i-i'"~'t-i"i-t .... ?t"~":":'~'~~ ~ ~ ~ , , ~ ~ ~ ~ ! ~ , ~ ' ' _~_~ . ~ , ~ , i , ~.~ , -~ , ~ ~ ~ ~ ~ ~ ~].~-, m~--f.-~-,-~-¢-~-'~ ...... rw-- ~ X ~t~ ~ ~ L..z...z L.~...~...;...~... ~ '..~. ~--~-~--~;'-~*-'~-"~-?'*'?" ~ ~ ~ ' ~ i ; i: ~ ~ i i .i....L..i ...... ~-..~..-;..-L-.~.---t.--~..--~-..~---T ....... ~ ...................... : -~' ~ i ~ ~ ' ~ Z--z. z-[ z...z...$...~ ....... $ ......... ~-.-~.--?~.--~.--~ ....... l---¢ ...... l ...... '" i i ~ ' ' ~ i ~ ~ ..... 4 ~ ...... ~ ........... ~ ......... ~" ...?.~----F-?-,'-'; ....... :~"'"~"';'~ , ~,: ~, 1... '_ '..44 ......... ~ ......... 1.4 .... ~?-?-~-~--rW-~"~'T'~"'~'"~ ~ ~ ~=i":' ~:::i::: ::::::::::::::::::::::::::::::::::::::::::: ~q"'~" ~~::..-$...~.-.~-..~.---F-+--.~...~.-+..t~'!:i-' ~ZZ] ~..L.$..~-~..-~-.~~-'~-i" ~~~'. ~...~ ...... L.L..i._$..-~...~...$...~...~-.~~-.~---i ..... i"'i-f"t-["t'T-~"T"."-F'T'T'T I ~ ~...~...1.... ~'~"~"-~" :::::::::::::::::::::::::: :--.~---~---~---~'--F~---~'"~'"~'" :~-:i--i"i"i'"??~ ....... t"?"?l'"t"TTT"T'i"i"i'"i'"'Fi i ~ ~~ ~ ~ ~ / ~ m ~ ~ ~ L~ ~ ~..~ ....... $...~ L.L.I...L.$..-$.-.$...~.4..-~-4--.~.--t.-+.-~-.-~-..~ ....... F-~'i"?i"i'"i"i"'i ...... I'"T'~'"YT'~ ] Z]Z ..~ L.~...~...~..-~.. "'~'"T , , , ~ '~ ~ ~ ~ ~ : : ~i ....... :...~...~....;...~...~...~..4...4 ...... +-.-?-?'~"'.'"t"'??'~ ~ ~ ~ : ~ ~ ~ ~ ~ : ~ ~ . ~ .......~...~...~ .............. ,.. "-i'--'~"i-'i---~"i""t"'i~' "'?]Z:TZU~ZZ:]:]Z~ ....... L.;..-L.i.-.~-..i...i..4..--~.-..--.i...~.-~---~--~.--i.--~-.-~.-'i ....... ~'"Y"~"-t'"i"'?'?'"r"i'"Z:ZT?ZZ:~ZZ::Z:]...L.. · y"["T'T"~"T'T"T"i ...... ]'i ~ ! i..-I.-.~.-.$ ..... i--.i.-J--4 ...... ~-4"4'"4'":'"4"i'"?'i ...... f"i"'i'"~ ...... ~"T'T'-TT":'-!'"T'T" ~ i ! ~ , ~ ~ ~ ~ ...... ~ ~ ~ ~, ~ L.~....;....;..-~....;...*....;..-; ........ ;--..~--+--~'"~"+'+"~'-~'"~_L.L..I...~...~...~...;.-.I.--;. i..-'~"i'"Y'i'"?'~'"t::: ::]::2]:]::: :]:::~::]:::Z:: ~:]...~..4...~...~...4-~-..~...~ ....... 4-+-,-.-~...~-+i..i.-i.-. ~J::I...~...~...~...~.+4- -~-"~"'~"'z]}zzTzz] ....... ~...~...~...~ ...... ;...4...i...~ ...... i...4...;---~--+--~-.-~...~-..-~ ....... i-.-i--i---i ....... i"?"~'"~'"?~'"ZZ[Z[Z.tZZ:iL.L..~ ....... ~...i...L..~....~....[....'~...i-..!...~....~...~-..~...~...~..-~. ~~_.i...i....~~...~..4 ....... 4.4..+-., ....... ,-..?-?i.--.~~](][]"~ ~ ~ Z..i....~....~...~...~ ........ ~...:....~....~...~..4. ~~Z:: ~4]~ ........ ~---~..-~.--~--.f--??'i ....... !"i"i"i'"~"i'"~"'L:t::::::~':? :::::::::::::::::::::::::::::~Z~:~::4...~...i...~...~...~...r....~...~...~...~..i...i. ..~...L.~...L.i.-.4.4.-.~...~ ...... ~.--~--.,---~--~+.~--.~.-.~ ...... i'"i"'i"'t"i'"'~'"~'"?"~'"."'Z] ::::::::::::::::::::::::: ....... LZ..t..-;4....~...~...~...i ....... ;...~-..~--.~.-..?.-~..+..e...~...r'~'"i'"i'"Y-~' --~.--~--i-'-~'-'~--'~"'~'""'i~'~h~]n?"t"t"i ....... ?"~"'?'T"TTTi"'~ ....... ~ ~ ~ i ii.L,.]. ~ ~ ~ ~i ~ ~ ~ ~ ..... (...L..i...L._[....~...;...~..-i ....... ~-..-L...~....~:4.--~.--~---+---~ ....... i--'-?'i'"'~"T"!'"x'"'~"'i ....... F"T'"?'T"Y'T"7"7~ .....L.:,...~....L.L..;....;...~...: ....... ~...~-.-;.-..;..-.~-.-~ .~.i..i..i..i...~...t..~..~:L~::::::::::::::::::::::::::::::::::::::::~:~:~.~...~....LL~...~...~...~ ........ ~---~---.~-.-.t---~..i-.i--i.--~ ....... ~.-.i..-.t.--?::?::?::::::Z]::L:Z:~:...~...~....:....~ ....... ;....:?.;...;...~.---~ :::::::::::::::::::::::::::::::::::: ..... ~...i...~--.-~---F-~---~.-.~--.~ ...... ~.--~.--~---!--i-i--'?-i"'~ ..... ?'i'-¢'"I"T'T'T"! ...... ["T-7['T"tii ! ~. ~ ', ~, ': L~ ~ i~i~ ~ ; ~ ;.L..LL.i L.i ....... ' L.i ~...i...L.i...i ....... ~...L.~....~.+-~-.-~.--~-.-~...:..--t..--t..-.~.---t--..?-'-?--?t""t ........ ~':~',::i:::t ~: :::::::::::::::::::::::::: -.-~..-~-"-r-'?-"*"'?'?~'"'~ ....... ;'"'7'~"~ ~ ! ~ t ~ ' .[..~...L.i ....... L...;...i....~ ...... ;..-;...+---.~ ....... ~--.-~--..~--'-~ ........ r"t"F'"; ....... ~'~ ~ ~ ~ ~ ~ ; ~ : ~. ..L...: .... ~....;----;-.--;-.-~-.-~....~-...?--> ....... ~----~'"'~'"'~'"'~""?'":""~ ......... :'"'?'I"",::~,~ ~...i...I...~...i...,...~ ....... ;--.~.---;..--;---~-+.-+----~---~ ...... e"'?'~'"*'"':'"'~"'?~"'~"?", ..... L..L...L..i...L.~...*...~-...;...~...~.---~.-.~.--~-.+-.~-.-.~---~"'i .......... ~'"'~"T"~'"~'"T"i ....... T'T"i [~ L...t....L...~ ....... L...;....;..-~....F...~.-..; ........ ~ ........ ~..--.~-..-~.'-~ ........ ?-"~'"'?'?~""~'"'?':'-?"T'" ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ...L...L..I...~...¢...~...; ....... ~-.-~--.-~---~-.-t'--~"'~'"~"'~ ..... F"?'"~'"'~"T'"~'"t"'~"'~"' ~ ~ ~ ~ { ~ ~...L..~ ........ ~....L..~..~...~.... ...+.-+.+-+.-i---t---t.--?--t ....... t.---r'--Y-Y-'F'Y'Y'Y-~ ...... ...L..L.t...z....t....;....~ ........ ~-...;...¢....~...~...-~-.-~----~.--.f ...... ?---~.---?---?..?--.-?..-~-'-?'-"~ ....... ~---?~"-?"-,'"'t'"'t' t....~ ...... ~..L..~...~....~ .... · .-~.--.~.--.t...-~...?~----~-"'~'-'¢ ....... t'"-;'"~'"'~'"'['EZ]'~ZZZ:~ Z ...L.L.t...~...¢.4.---; ..... ¢.--¢--..~.---t----}.--.~-"f-"-E-'-~ ..... ~-"¢'"'~'"'~-"t'"t-"?"~"'?'"]:L::Z~2:2~:~ZZ::~]]...~ ........ ~....~...~....;..4..~ -..~-.-.~...-~.---~--'-;-'-f-"?'"'mt ....... ¢'"T"T'"7"" [ ~ ~ ~ : ..~...~...~...t...;...¢...4 ..... ¢...;----~--.e--?-~.--+--~---+ ...... ~"¢"-~"-~'"~"'t"'~"T"~ .... ~ ; ~ , : :. ~_~~ ~ ..~...~..4..-;.+.+-.~..+--+ ........ ~---~---:-"t"-~'"r"~'"?"t ....... ~ ~ ~ ~-+j ,: ~ ~ ..~ m ~ ~ ~ ~ I ~ ~...;-~... [...~-..;.-.;...~..-[--+.4.-+.-+ .......... +-..?-~--'t"-'r't'"~ ...... YT"i'"~'i :~ ~ ~ ~ ~ ~ ~._~...~....;...;...~...; ....... ;..-.~...-~-.+.+.+.+.-'~"-+ ...... ~ ........ ~"";'"J .... "'~"'~'"~ } ~ ! ~ ~ ~ [ ~ ~ ~ .L._~..;...;...;...; .......... ~---~---~.--~..--~-.-+..--~ ...... ?.?'"~"'t'T't'"t'"T"T" :~ ~ ~ ~ ~ ~ L ~ ~ ...... L....~....~...;....~...-;....;....;....; ....... *..--~....~..-.~--.~ ~ ....~-..?---?-t--~-..t-.-?"}'"? ..... T"T"?'? ! ~ ~ ~ [ ,...z !...~...i ....... ;--.;.-..~--.-;---?-~--.~----~-.-~ ...... :'"??"T"'}""~"~'"'}""~' ~ ~ ~ ~ ~ ~ ' ~ ~ ~: ', ~ ~ : .;....;...{ ; ;..4...~ ...... ~-.' ' -' - ?-t-..?t .... T"i'"'F' ~ ~ ~ . : ; : ; ; ; ; , ' ; ..... ~ --"~[~ ~! :, ~ ~ I~IRQDR~ ~ ~ ~ . , ' ' ' ........ PROJECTION ON VERTICAL PLANE IS3. - 333. SCALED IN VERTICAL DEPTHS HORIZ SCALE : 1/20OO IN/FT BP EXPLORATION BP Ex01oration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-511'l To: Distribution Date: 10/13/89 Transmittal: 80458 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. R-15 Z-18 Z-18 Z-18 Z-!8 Completion 10/09/89 91 8500-9360 Sch CET 10/06/89 91 13190-14180 Sch CBT 10/06/89 91 13190-14158 Sch Completion 10/07/89 ~1 13572-14044 Sch Depth Determination 10/05/99 ~i 13092 ~no Sch 5 -Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS, RESERVOIR ARCHIV~'' BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO ARCO EXXON Date: 10/06/89 PHILLIPS T#: 80447 ~___~OF ALA~R~j SYSTEM Tape & Transmittal Only ARCHIVES BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Z-18 OH/DIFL/BHC/CNL W/CHCN 10/01/89 8- 10094-14363 Tape Pos#06740 Atlas93990 1600bpi API#50-029-21971 0ii & Gas Cons. Commissi0r~ Anchorage Information Control Well Records LR2-t J. Dietz/S. McCurry 'MEM'O'RAN DuM State Alaska ALASKA OIL Ai%D GAS CONSERVATION CO~,IISSION TO: Lonnle C. Sltllt -"~ DATE: September 20, 1989 Commissioner FILE NO: D. BDF. 097 THRU: FROM: TELEPHONE NO: Michael T. Minder '///-~'~/'~'~. SUBJEC'I~ Sr. Petroleum Engineer Bobby D. Foster ' Petroleum Insped~or~ --~: BOP Test BPX PBU Z-18 Permit No. 89-96 Prudhoe Oil Pool Tuesday, September 12, 1989, The test beganmat 4:00 pm and was con~~6]-0~ p~ ~e attached BOP test report shows there was one failure which was repaired and functioned properly after repairs. In summary, I witnessed the BOP Test on BPX's Z-!8. Attachment 02-001A (Rev, 8~85) .? t STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Inspection Report Location (general) z/ Well sign General housekeeping Reserve pit Rig Rig # MUD SYSTEMS: Visual Trip tank Pit gauge Flow monitor Gas detectors Audio BOPE STACK: Test Pressure Annular preventer Pipe rams Blind rams Choke line valves- Kill line valves Check valve Representative ~.?~'~ ~'~,'~~ Casing set @ ~l~ ~ ACCUMULATOR SYSTEM: Full charge pressure ~ )~ psig Press after c, osure /~D~ psig Pump incr clos press 200 psig ~ min ~sec Full charge press attained ~ ,min ~sec Controls= ~e~r ~~ Remote ~~ Blind s~itch cover ~~ KELLY AND FLOOR SAFETY VALVES: Upper Kelly Lower Kelly Ball type Inside BOP Choke manifold I Number valves // Number flanges Adjustable chokes ~--~ Hydraulically operated choke Test p r es s u re ~_~o !~_~3~ ~ Test pressure Test pressure Test pressure~. Test pressur~o TEST RESULTS: Failures / Test time ~ hfs Repair or replacement of failed equipment to be made w~th~n ~ and Inspector/Commission office notified. --" days Distribution: orig - AOCCC c - Operator c - Supervisor C.004 (rev 03/17/89) BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 24, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton Well Z-18 (24-29-11-12) PBU Enclosed, in triplicate, is form 10-401, our Application for Permit to drill the above-named well. Also included are the attachments noted on the permit form and our check in the amount of $100.00 to cover the permit filing fee. · Vidrine I~rilling Engineering Supervisor JGV/KTH cc' Susan Leach Well File RECEIVED AUG 3 o 1989 Alaska 0il & Gas Cons. Commission Anchorage September 1, 1989 Telecopy~ (907)276-7542 J. G. Vidrine Drilling Engineering Supervisor BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Prudhoe Bay Unit Z-18 BP Exploration (Alaska) inc. Permit No. 89-96 Sur. Loc. 984'SNL, 1996'WEL, Sec. 19, TllN, R12E, UM. Btmhole Loc. 4689'SNL, 3649'WEL, Sec. 29, TllN, R12E, UM. Dear Mr. Vidrine: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. ~C%-- V. ChatE~rton ./ Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF THE COMMISSION dlf Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA L,,L AND GAS CONSERVATION CON,,vIISSION PERMIT TO DRILL 2O AAC 25.OO5 1m Type of work Drill [] Redrilll-]llb. Typ® of well. ExploratoryF'l Stratigraphic Testl-I Development OilE] Re-Entry [] Deepen []I Service [] Development Gas [] Single Zone [] Multiple Zone [] , 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exo/oration KBE = 92 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property DesignatiOn Bay Pool P, 0. Box 196612. Anchoraae. Alaska 99519-6612 ADL 14. Location of w~t~surface 7. Unit or property Name 11. Type Bond(,e, 20 ~Ac 25.o25) '984'SNL, 1996'VlfC~ SEC. 19, T11N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 4574' SNL, 3708' WE/_, SEC. 29, T11N, R12E Z-18 (24-29.11-12) 2S100302630-277 At total depth 9. Approxi~a. te spud date Amount 4689' SNL, 3649' WE/_, SEC. 29, T11N, R12E SeptembeT~, 1989 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (aD and TVO) property line ADL 47452/3649 feet WelIZ-19 @ 35 feet 2560 14071'MD / 9166' TVDfeet 16. TO be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 500 feet Maximum hole ancjle53,7~ Maximum surface 3330 pslg At total depth (TVD) 18. Casing program Specifications Setting Depth raze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" Cond. 80' Surface 110' 110' 17-1/2" 13-3/8" 68# L-80 Butt 3181' Surface 3211' 2680' 4460 cuft Permafrost !2-1/4" 9-5/8" 47# NT80S NSCC 13388' Surface 13418' 8720' 2927cu ft Class G 8-1/2" 7" 26# L-80 IJ4S 1003' 13168' 8572' 14171' 9166' 265 cuft Class G , .... 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor REC IV[D Surface Intermediate AUG ;¢ 0 ]989 Production Liner ~aska 0ii & Gas Cons. C0mmJssJ0 Perforation depth: measured Anchorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] ~Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21.1 herebyjj.cert/¥y,,.tt~.tJthel,_//_( ,0(/ foregoing///_ is true and correct to the best of my knowledge ~,/~ , Si~ned ~ t/. ~.,~"~ ~ Title Drilling Engineering Supervisor ///. . Commission Use Only .... permit Nu_mber(/_. _ IAPI number ... _.. ..., IApproval date See cover letter OC;c~- ~/~- J50-~).:2.~ .~2../ c/, 7/ J 09/01/89 for other requirements Conditions of al:Jproval Samples required [] Yes ,~_..No Mud log required_ []Yes Hydrogen sulfide measures [] Yes ~ No Directional. survey requ~re~ J~ Yes C! Required work,~q~~~/~3M; i~[5M; i-ll0M; I-I15M; Other: ' by order of Approved by ~ ". ,./', ~k,~_'~'~~'~"~ . Commissioner ,ne c0mm,ssion- D , Form 10-401 Rev~-12-1-85 t Submil cate AFE No. PROPOSED DRILLING AND COMPLETION PROGRAM .WELL Z-I8 [24-29-11-12] PBU Install and cement 80' of 20" conductor to surface. Install 20" diverter. The Drilling fluid program will consist of an 9.5-10.0 ppg spud mud in the 17- 1/2" hole, a 9.5-10.4 ppg water base mud in the 12-1/4" hole and a 9.6 ppg water base mud in the 8-1/2" hole. Drill 17-1/2" hole to 2672' and cement 13-3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maxitnum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 17-1/2" and 12-1/4" hole to the 9-5/8" casing point above the Sadlerochit Sandstone. Run 9-5/8" 47# NT80-S NSCC casing to within 10' of 12-1/4" TD and cement with Class G cement around the 9-5/8" shoe. The annulus will be freeze protected by dry crude. Directionally drill 8-1/2" hole to TD. Run 7" liner from TD to 250' inside 9-5/8" casing shoe and cement using Class G cement. Clean out to 7" float equipment. Change over to NaCL completion fluid. Test casing and lap to 3000 psi. Run 9-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. The well will be perforated with rig on location. Tubing Size: 3-1/2", 9.2# L-80, EUE 8 Round A/B Mod IPC TBG with 7 GLM's. Tailpipe Size: 3-1/2" TAILPIPE SAL: 8-21-89 PROPOSED DOWNHOLE DIAGRAM WELL Z-15 [24-29-11-12] PBId PROPOSED DEPTH BKB 20" Conductor 110 Ball Valve 2100 13-3/8" Casing Shoe 17-1/2" Open Hole 3211 3244 3-1/2" 9.2# L-80 EUE 8RD A/B MOD Butt IPC. Tubing with 7 GLM's 9-5/8" Packer 13118 7" Tieback Assembly 13168 9-5/8" Shoe 13418 12-1/4" Open Hole 13428 7" 26# L-80 IJ4S Liner 7" PBTD 14131 7" Liner Shoe 14171 8-1/2" Open Hole 14171 AUG 3 o l Jl 9 Alasga 0ii ~ Gas Cons. SAL:8-20-89 B.O.P. STACK CONFIGURATION 13-5/8 IN. TRIPLE RAM STACK 5000 PSI WP DRILLING ANNULAR PREVENTER 2 IN. KILL LINE L G ATE G ATE 1 ! I PIPE RAMS I I l BLIND RAMS ! I DRILLING SPOOL I I PIPE RAMS 4 IN. CHOKE LINE GATE GATE SURFACE HOLE DIVERTER ~,YSTEM Two lines venting 90 deg. apart in directions that ensure' safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. 10" Full Opening Valves 35' or as required 3 Dresser Sleeve 10" Diverter Line 1. All Pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. 2. Manual 10" butterfly valves mechanically connected to ensure that one valve is fail-safe open at all times. 3. All turns are 90 deg. and targeted. 10" Full opening ball valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet JWB 2/2O/89 I NORTH WELL N* Z-18 SURFACE LOCATION iLAT. · ?0° I?' SI.647" LONG, · 149° I1' 3,2.83,4" I Y · 5 959 099. 79 A.S.P. i X · 599, 719. ?9 ZONE 4 984' FRON N. LINE SECT. 19 1996' FROM W. LINE SECT. 19 I I I I II [ I I I lll I Ill II T. IZ N. '[,liN. T. ION. ~AD 28 3,4 ~C& LE : I ( MILES RECEIVED TW. 'C' II I AUG 3 o 1989 Alaska Oil .& Gas Cons. Commission ', ~ ~nnhnrnnn~,,-~- I I ii',"- ..... CERTIFICATE OF SURVEYOR: I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED &ND LICENSED TO PRACTICE LAND SURVEYING IM THE STATE OF ALASKA &ND THAT THIS PLAT REPRESENTS A MY ~I~ON, ~D THAT ALL ~ENSIONS ~AND OTHER D~ILS~ ~ CORRECT. '~~~/ NOV. 20,86 SURVEYOR DATE; I ] ji I SHEET I -OF 2 I Jill II I I WELL PAD 'Z' WELL N° Z-18 AS-BUILT ii i i i,! i i i Ri , i~ ii LOCATE D IN PROTRACTED SECT. 19, T. II N., R. 12E., U,M. SURVEYED FOR : STANDARD ALASKA PRODUC'rlc)rJ CO. Ir PREPARED IY : ! DATE : #OV. 20,B6 KUUKPIK - TECHNICAL SERV. INC. DRAWN BY: PRUDHOE BAY OFFICE I CHKD. ; R.H, L__ T. II N.,R. 12 18 z-It, Zol~ Z-14 Zol~ Z-J6 Z-IT Zol~ Z-Ig Z-ZO WELLS WELLS Z-2:~ Z-Z4 Z-25 Z-2~ ALASKA GRID [ OF WELL PAD LEGEND · EXISTING CONDUCTOR BOX o FUTURE CONDUCTOR BOX WELL PAD "Z" SCALE 1"=400' (AS STAKED) II II PAD Z Loc Died in .PROTRACTED'SECTION' 19 ~: T. II N.~ R.I2 E.~ UMIAT MERIDIAN,AK. Surveyed for ;:,S..?ANDARD'ALASKA PRODUCTION CO.' Surveyed by KUUKPIK TECHNICAL SERVICES, INC. ANCHORAGE, ALASKA (907) 561 - 5257 " _S45DUAI24: [DRANO13]ZIS_CLOSAP_SHORT. LIS;5 25-AU~-1989 i4:~=~ C'l-oses~--Ap'p-ro-ach--An~l-g~---- Date: AS-AU~-89 Time: 14:25:30 Page I .. Search Radius= 200 ~ For proposed well: Z-18 COURSE LINE [24-29-!i-12] . Location = W-E S-N TVD(SBS) : Top 59~720. O0 ,.5c~5c~0~c.;'. O0 _c;,,--,. O0 .~ --- ~-o t't-om---- ~044-~5I. 74 ,.9,.,0.,7 .... 85~857-. O0 Note: All depths in ~eet Belo~ Kellg Bushing (BKB) . Closest Approach CtzOSES~ Verticat Intersection /P1R13POSED\ /NEAR~Y-\ DEPART TVD DEPART VER~T-I~A L i14 ;,5! , TVD DEPART TVD DEPART DISTANCE TVD DISTANCE Z-14 100. 0 O. 0 100. 0 A02~--~ 184~00 _., :?~ Z='-i'-5 O. ~ 0.0.0.0.0.0.0.0.0.0~0 O. 0 :~ AO-'~c2-~ 185 .gO0 :: Z-20 885. 0 3~. 8 884. 5 O. 4 140. 2 '~ 60. SUMMARY The $ell which comes closest to the proposed well is: A02~-2185~00 Z-20 Closest approach distance = ,..--lkI CI,'~OFF--'Po ~ h~i-s--~ un' - ,, 60. 1 ~eet 5007.' O-~-ee t' $4~DUA124' [DRANO13]_Zi_8_CLOSSP___S~_OR_TZ,_L!S_t_~ l_8-_AU.Q-!_~8_9__14' 58 ---Closest Approach Analgsis --- P_a~_e 1 Date: 18-AU~-89 Time: 14: 33:03 ' ___Sem~.c_b 8_ad_i_~$_.-~P_O______Z_DEg_BEE._ L E~ D _J~I NE __ For proposed wel 1: Z-IB [24-29-i1-12] Top 5~7~0. O0 5~590~, O0 -9. ~0 Bottom 605014. 56 59508~0. 75 8~85. 00 i9! Note: All depths in ~eet Belo~ Kellg Bushing " Closest Approach m~ WELL IDENT /PROPOSED\ /NEARBY\ CLOSEST TVD D~ART TVD DEPART D~ISTAN~_E A0~-2184400 ~-14 A02~-~184900 Z-10 0.0 0.0 82.5 O. 1 I05, 1 Vertical Intersection /PROPOSED\ /NEARBY\ TVD DE.P~RT TVD DEF_AS! VERTICAL D~I_~T_~ Z-20 c~5. 7 40. 3 1008. 2 2. 7 55. 3 371 391 " SUMMARY The ~ell ~hich comes closest to the proposed ~ell is: .......... AO2°~-_2i 8~?QO _ Closes~_.app_~oac_h _distance = KICK Off Cot this run = 500.0 59' z' i&¥ a~L. DESAN DE. R O~CO IZ 3 ~0 piT' BR,(NDT DJ ~ c 7'0 T'A~DEM ?t r 1 - Brandt Dual Tandem Shale Shaker 1 - Demco 6-12" Cone Shale Desander 1- Demco 416H w/16 cones & (1) Demco 48H w/16 cones (Desilter) 1 - Drilco Atmospheric Mud Degasser 1- 200 gpm Operating Capacity. Centrifuge 15 - Brandt MA5 Mud Mix Agitators 1- 150 bbl. Trip Tank 1 - Recording drilling fluid pit level indicator with both visual and audio warning devices at driller's console 1 - Drilling fluid flow s.~,~s~ or with readout at drill%~,!,s console MUD WEIGHT CALCULATIONS WELL Z-18 (24-29-11-12) Mud Wt. (8-1/2" Hole): 9.6 ppg. P Sag River: P Sadlerochit: P Top Sadlerochit: 3880 psi. 3898 psi. at 8800' TVDSS 3895 psi. OB Sag River: OB Top Sadlerochit: Current GOC: 204 psi. 258 psi. 8887' TVDBKB 9-5/8" Casing Pt. Top Sag River Top Sadlerochit 8720' TVDBKB 8726' TVDBKB 8874' TVDBKB Cement Calculations 13-3/8" CASING Measured Depth: 3211' Basis: 2 X Annular volume Total Cement Vol: 4460. (cuft) Lead Slurry Vol: 3995 (cuft) Tail Slurry Vol: 465 (cuft) 9-5/8"CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 13418' 90% Annular Volume to 13-3/8" + 50 cu ft 2927 (cu ft) 2697 (cu ft) 230(cu ft) 7" LINER Measured Depth: 13168' (Shoe) Basis: 1.5 X Annular volume to 9-5/8" shoe + 150 cu ft Total Cement Vol: 265 (cu ft) SAL: 8-21-89 CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DA%E (2 thru 8) ..... me 5. 6. 7. 8. (3) Admin ,fi/Pt'". ~ 9. '(9 -thr t0. (10 and 13) 12. 13. (4) Casg ~~ ~ (14 thru 22) 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. (23 thru 28) Company Lease & Well No./~~YES NO '-~%ZRK; Is the permit fee attached .......................................... ~ Is well to be located in a defined pool ............................. ~ Is we~] located proper distance from property line .................. Is w~,~ !ocated proper distance from other wells ................ · .... Is suz~icient undedicated acreage available in this pool .... Is well to be deviated and is wellbore plat included ........ ''''~........ .... / ~- Is operator the only affected party ................................. <~ Can permit be approved before fifteen-day wait ...................... 4~- Does operator have a bond in force .................................. ~ Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number ......................... Is conductor string provided ........ , ................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate ~ Are necessary diagrams and descriptions of diverter and BOPE attached. ~ Does BOPE have sufficient pressure rating - Test to ~'OOd) psig .. ,~_ Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. (6) OTHER '(29 th~-~l) ' (6) Add: Geology: Engineering: ~ rev: 01/30/89 6.011 For 29. 30. 31. 32. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented-- Additional requirements ............................................. INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Addit±onal Remarks: (D Well HiStory File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the .end of the file under APPENDIX.. .. No special 'effort has been made to chronologically organize this category of information. PROGRAM: LISCAN Start of execution: Wed P~VISION: 5.2 4 OCT 89 2:!8p PART NUMBER: W5790-MICRO ** REEL HEADER **** LIS 89/ o/oi ATLAS 01 'LIS CUSTOMER FO~/W~T TAPE' **** TAPE HEADER **** LIS 8g/ oto F41CROFIL fED 3990 01 'OPEN HOLE-DIFL, BHC, CN POR & CHCN: R/LNGE IS 14363-10094 FT' FILE # ! MAIN ..001 1024 CN WN FN COUN STAT **** FILE HEADER **** BP EXPLOP~.TION Z-t8(24-29-!1-12) PRUDHOE BAY NORTH SLOPE ALASF_~. , . * FOR~L~.T RECORD (TYPE# 64) ONE DEPTH PER FB3LME T~_DE DEPTH UNIT : F 15 CURVES : NAME CODE SAMPLE# UNIT 1 GR 68 1 API 2 RFOC 68 1 OHMM 3 RILD 68 ! OHMM 4 RILM 68 1 OHMM 5 SPD 68 1 F/MM 6 SP '68 ! MV 7 CHT 68 1 LB ..8 TTEN 68 ! LB BYTES 4 4 4 4 4 4 4 11 LSN 68 1 12 SSN 68 ! 13 CN 68 1 14 CNC 68 1 15 TEMP 68 ! CTS 4 CTS 4 PCT 4 PCT 4 DEGF 4 DATA RECORD SPD AC' TEMP 14363. 000 0,0000000E+00 50,00000~ 100. 0000 19.99800 80.96819 100.0000 !4263.000 21,99780 78.82826 195.6933 14213.000. 21.59160 81.79836 196. 7968 14163.000 21.40410 79.68056 "197,8097 14113.000 21.99190 73.30540 198,4654 o6 .ooo 21,03951 71.05879 198.4893 14013.000 18.99811 64.78621 197.8669 18.99811 80.21745 196,7651 13913.000 18.99811 84.58800 1QK..,1911 (TYPE# GR SP LSN o) O. 0000000E+00 -80.00000 25.OO0OO O, 0000000E+O0 -50.68498 25.'00000 29.66664 -37. 56641 162.4566 27.05307 -49.86197 117.3132 24.08699 -47.70879 124.'5523 23,66336 -42,23726 151.5717 28.97249 -44.83234 138.8967 55.59538 -23,74310 168,3041 118.3726 -4.740310 74.22261 46.84282 -48.13402 116.8514 966 BYTES RFOC CHT SSN 0. 2000000 300,0000 100.0000 3.465075 1027.614 100. 0000 3.652919 1052;789 346.0000 3.377039 1101.236 294-9355 4.053426 1106.344 312,0625 5.790864 1049,092 324.9487 5.079123 984.3652 323.3625 13.99611 1005. 113 366. 7937 5.354812 912,2122 226.7912 8.619177 898.7832 291.2612 RILD TTEN' CN 0.2000000 4500.000 0.0000000E+00 .. , 2.2~0'859 6340.742 O.O000000E+O0 2.678787 6518.195 14.12256 2.139575 6704.125 18.77133 2.665473 6760.297 18.66679 3.423203 6789. 098 14.29202 3.765748 6898.496 16.51723 8.143959 6955'. 289 14.72002 4,847580 6765,973 25.40805 8.936485 6812,293 18.51033 RILM CILD CNC 0.2000000 O.O000000E+O0 O.O000000E+O0 2.529254 440.3621 0.0000000E+00 2.425724 373.3032 18.12256 2.131040 467.3826 22.77133 2.586328 375,1680 22.66679 3.525758 292.1240 18.29202 3.773596 265.5515 20.51723 7.195867 122.7904 18.72002 4.768366 206.2885 29.40805 6.833446 111.9008 22.51033 13 863.000 18.99811 82 .'21523 194. 5804 3 813.000 18.998i! 83.65231 193.9547 13 763.000 19. 99800 84.58133 193.4912 13 713. 000 14.29600 69.49571 193. 0063 13663,000 18.59781 68.92651 192.4592 13613. 000 18.99811 61.69135 190.8517 13563.000. 18.9981! 75.13512 !89.2358 13513.000 11.99880 54.60295 !88.2360 13463.000 11.99880 97.66597 187.4180 13413.000 0.0000000E+00 74.56207 183.6041 13363.000 -999.2500 -999.2500 -999.2500 31.07285 -50.83099 116.7555 41.51387 -51.76103 116.9860 27,60883 -39.45564 131.7064 209. 8065 -8.378958 134.4848 94.32782 -1.752335 145:3187 223.1465 21.36668 i82:4032 101,6701 4.977636 102.1765 65.94182 -19. 42287 412'. 8882 133.6636 -0.3912662 40.84081 73.65634 -8O.O0O00 28.74890 ., -999.2500 -999.2500 -999.2500 10.67583 885,5398 291.1323 11.74803 950.8325 290.0801 13.22862 1100.289 309.7727 3.095448 1167.725 292.9219 10.08796 1t46.318 321.1377 53.00807 1155.972 344.7468 24.12801 1136. !92 275.2734 ,. 172.1661 995.9648 514.4922 3.826657 1529.144 166.7871 0.2000000 300.0000 147,2112 -999.2500 -999.2500 -999.2500 13.31561 6827.426 18.52177 16.71289 6930.000 18.35304 17.51048 7126.758 16.80666 3.628551 7246.492 14.70497 7.277120 7192.777 15.08855 44.39696 7202.934 11.24651 18.39259 7102.871 20.96063 95.46704 6907.461 3.857008 2.675038 7513,113 39.61952 0.2000000 4500.000 61.58418 -999.2500 -999. 2500 -999,2500 9,272032 75.09982 22.52177 10.11786 59.83403 22.35304 10.09404 57.10864 20.80666 3.6!6279 275.5920 18.70497 6.755126 137.4170 19.08855 21.24593 22.52406 15.24651 14.46474 54.36969 24. 96063 35.32307 10.47482 7.857008 2.858232 373.8264 43.61952 0.2000000 0.0000000E+00 65.58418 -999.2500 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 134 14363,,00 ENDING TAPE DEPTH = 13363.00 FILE # '2 **** FILE HEADER **** . , 102'4 FORMAT RECOIl/) (TYPE# 64 ) ONE DEPTH PER TAPE DEPTH UNIT~: F 15 5 7 8 9 10 !! 12 13 14 15 CURVES : N~34E 1 GR 68 2 RFOC 68 3 RILD 68 4 ~RILM 68 SPD 68 SP 68 ' CHT 68 ' TTEN 68 CILD 68 AC 68 LSN 68 SSN 68 CN 68 CNC 68 TEMP 68 CODE SAMPLE# UNIT AP1 OF. MM OHMM F/MM MV LB LB US/F CTS CTS PCT PCT DEG BYTES 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 DATA RECORD DEPTH SPD AC 'TEMP 14350.000 0. 0000000E+00 5O.0000O ~100.0000 14300.000 19.99800 85.11174 !00. 0000 14250.000 19.99210 80.26546 200.9779 14200.000 !9.99800 87.68280 201.4240 14150.000 19.99800 77.86777 ( TYPE GR SP LSN o) 0. 0000000E+00 -80.00000 30.O0OOO 0.0000000E+00 -64.89529 30.00000 45.66629 -45.69980 110.6298 19.26018 -76.09468 99.18260 21.62396 -52.47433 137. 8909 966 BYTES * RFOC CHT SSN O. 2000000 3OO.O0OO !00.0000 3.528848 !285.071 100.0000 3.471651 973.8870 288.5164 2.608012 1011.278 272.9487 3.888690 909.2893 313. 4626 RILD TTEN CN 0.2000000 5500. 000 0.0000000E+00 2.231008 7232.160 0.0000000E+00 2.549604 6788.820 19.91162 1.612001 7014,687 2!.66708 2.757493 6938.953 15.85428 RILM C!LD CNC 0.2000000 O.0000000E+00 O.0000000E+00 2.344657 448.2280 0.0000000E+00 2.572639 392.2178 23.91162 1.626827 620.'3469 25.66708 2.816657 362.6482 19.85428 14100.000 19.99800 70.17818 202.1307 14050.000 12. 96300 81.15579 201. 7668 14000.000 16.99831 91.07355 200.7370 13950.000 16. 9983 ! 78.09702 199.1360 13900.000 17.62770 82.19061 197.8874 13850. 000 20.99791 85.37791 197.1357 13800.000' 21.99780 82. 81653 196.7135 13750.000 21. 00380 78.42429 196.2548 13700.000 13. 96290 67.37642 195.6902 13650.000 12.99870 57.13737 194.7760 13600.000. 12.99870 55.63695 192.8618 13550.000 18.38051 88.52951 190.8703 13500.000 14.99850 75.69878 189.7096 21.22853 -31.85431 197.5085 32,95917 -71.46054 118.7870 23.64958 -55.'67538 ·85.01210 127.7589 -11.95638 8!.20869 36.91423 -40. !4665 126.0004 · 25.53421 -62~34563 124.7305 33.35982' -62.86911 103. 2123 32.73792 -42. 96152 105.4093 53.35747 -22.92744 162. 5994 158.4379 -24.18582 210.1646 84. 40903 -13.58501 284.7341 1'34.2956 -!0.28423 75.60982 72.47482 -60. 90550 197.3632 5,.967873 884,0833 369.7231 4.386515 906.9385 293.5386 5.859362 994.9531 255.4450 4.911715 897.6775 229.1337 9.081289 852.0513 303.9387 10,27164 891.5752 298. 6660 · , 12'.'97554 976. 0945 272.3752 ·15.10846 1109.143 271.5881 10.03106 1209.430 330.5857 20.21349 1141.965 355.6909 t08,0656 1225.679 448.8330 34.57344 1133.380 242.4682 16.82698 1111.069 371,8308 3.527227 7011.023 11.03091 2.569910 7111,594 !8~25020 4.369439 7244.434 24.77701 5.693985 7043.961 22.51823 8.984026 6970 .'535 17.53584 13.20487 7024.277 17.32124 17.11026 7162.789 20.28922 18.35106 7328.566 19. 52946 10.14621 7481.293 12.95950 24.11913 7387.441 8.908401 94.40901 7432.582 7.556427 28.92853 7228.023 27.30923 28.47997 7191.375 11.17458 3.735573 283,5088 15.03091 2.630201 389.1!87 22,25020 3,973750 228.8623 28.77701 4.978566 175.6239 26.51823 7.015529 111.3087 21.53584 8.568216 75.72964 21.32124 11.30757 58.44444 24.28922 11.61965 54,49278 23.52946 9.416500 98.55901 16.95950 17.20229 41.46086 12,90840 34.37643 10.59221 11.55643 21.45868 34.56795 31.30923 23.57050 35.11241 15.17458 14,99850 103.1609 18'8~, 5857 13400,000 0,0000000E+00. 50.00000 '185.5261 -31,25331 25,43811 76,!9539 -80.0000O 29.26320 1034,854 128,9236 0.2000000 300,0000 144,7789 7019,441 60,13602 0.2000000 5500.000 56,97441 173,9498 64,13602 0,2000000 0.0000000E+00 60,97441 TOTAL.DATARECORDS : STARTING T.~PE DEPTH = **** FILE TRAILER 127 14350,00 ENDING TAPE DEPTH = 13398,00 FILE # 3 CHCN ,003 FILE HEADER **** 1024 FORMAT i~JECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT" 9 CURVES : NAME CODE SAMPLE# UNIT 1 GR 68 1 API 2 SPD 68 '1 M/MM 3 CHT 68 1 LB 4 TTEN 68 1 LB 5 LSN 68 1 CTS '6 SSN 68 ! CTS 7 CN 68 1 PCT 8 CNC 68 ! PCT 9 TEMP 68 1 DEG BYTES '4 . 4 4 4 4 4 4 4 4 * DATA RECORD (TYPE# DEPTH GR LSN SSN 0) 1006 BYTES * SPD. CHT CN CNC TTEN TEMP 13470,000 3O,O0000 0.0000000E+00 52; 58850 1064,666 100,0000 0~7824336E-04 -0,7525595 7038,664 !00,0000 13420. 000 90. 06209 48 , 99510 1068,460 7114,660 26,755!0 145,8767 58. 06038 54. 35651 178,6465 13370,000 82,45848 52,99471 1048. 727 7069,332 29,18030 154,2307 52,72916 49,62242 178. 9361 . 13320,000 31,28070 13270.000 29.23151 13220.000 27,98430 13170,000 34.50410 !3120~000 27.20430 13070.000 32.58810 13020,000 38,35251 12970.000 30.32249 12920. 000 37. 78740 12870.000 30.54950 12820,000 40.56990 · · 12770.000 32.20981 ,, . 12720.000 27,4282! 12670.000 25~560!0 12620.000 25.86060 12570.000 27.35980 99.42810 143.7480 93.14958 147.6801 74.13101 132.8524 72.58719 i50.!051 8o.8Oo, 3 145.!569 82.25641 148.0395 70.07938 153.2004 73.12077 144.5048 . , 57.42484 144.4937 68.63620 152.8676 59.58821 158.0215 68.59367 149.0950 74.78627 !40.6441 78'.49715 !34.9088 73.40263 135.8480 !37~7057 52.99471 50.91760 53.55270 59,43935 55.39481 52.45311 55.39481 48.25049 54.39491 58.09082 54.99451 47.80807 54.99451 41.85770 .54,95291 50.68555.. ., 54.99451 42.20308 54,99451 51.84006 54.99451 39.34593 54.39491 44.39517 54.99451 59.88295 64.52975 55.58820 58.67447 '56.03011 57. 70049 1012.355 48.01379 958.9956 55.58101 932. 1187 49.37733 915,6973 45.64543 939.3252 54.38358 951.5801 45.25253 994.2517 39.96863 1024.260 47.80774 998.2112 40,27536 995.5227 48.83290 993.7048 37.73824 988,7444 42.22191 947.1074 55.97495 955.0364 60.10129 957,0222 54,90184 948,5125 54.03699 7034.023 179.1339 6862.145 179.3679 6829.184 179.2400 6810.418 178.9015 6780.691 178.4156 6756.137 177.8434 6782.195 177.2477 6818.199 176.7907 6698.457 176.3609 6705.848 !76.0182 6635.469 175.7037 6677.570 175.3311 6571.504 174.9145 6528.207 174.3762 6515.664 173.6578 6434.266 172.9419 12470,000 28~08560 124.20. 000 25,79970 12370,000. 53,014'11 12320,000 ,28,85930 12270,000 3.z). 26970 ,, 12220,000 37,63640 12170,000 33~7519! 12120,000 40 ,~69022 12070. 000 41.82121 12020,000 40,33580 11970,000 26,20390 11920,000 23,96049 11870.000 28,04390 11820.000 25,71770 11770,000 27,28070 !t720,000 25,33591 60,58699 138,0678 64,23770 139,85'18 39,47227 18!,4951 73,89233 134,7428 57,36188 147.7054 48.51074 148,4206 52.,50804 !44,4537 43.98720 153 °.7798 52, !8506 159,4879 52.54105 155.9501 70,19658 129.,5455 70,11807 126,9259 71,13045 131,2987 63,86963 128,4674 69,98564 136,8596 65,67596 132,0862 56,39470 5'7,93178 55,99442 69~,62154 56,'03601 35,97.723 56,3947.0 5'5,23547 56,5.5240 41,15871 55,99442 41,51392 56,40060 38,39331 56,95270 38. i663! 55,99442 35.33876 57. 40051 34.72305 57,99420 54.98764 58,39450 61,58063 , 57~03000 55,62698 57,95261 58.07591 57.95851 55,54532 57,99420 61,30688 97'8', 7017 54,24237 950,471'4 64,62280 · 949,7939 34.74689 962,8286 51,84805 995,7288 39,34799 974.3293 39.66342 986,9512 36.89229 993.9509 36,69072 1001,141 34.17990 970,8723 33,63315 980,1685 51,62794 985.1877 57.48242 983,6406 52,19557 1009,082 54,37024 1014.090 52,12305 1013,442 57,23929 6477,867 171.3780 6354,738 170,5108 6348.953 169,7531 6330.750 168.8874 6315.809 168.2112 6269,402 167.5007 6255.203 167.1043 6279,941 166,6625 6285,789 !66,3143 6205,105 165,9763 6212.082 165.5986 6229,898 165. 1407 6186,387 164.6323 6202.070 164,0388 6128.293 163.2080 6170.461 162,5042 11670.000 27.40561 11620.000 25.86150 11570.000 22.72740 11520.000 25.09441 11470.000 25.36690 11420.000 31.26730 11370.000 27.05710 11320.000 30.01201 11270.000 28.10220 11220.000 28.00180 11170.000 25.52950 11120.000 28.68420 11070.000 26.91451 11020.000 23.89850 10970.000 23..70470 10920.000 26.43401 64.14296 139.6705 7!.1!125 13!.4240 63.53912 130.2113 65.36438 131.5860 73.67873 131.7465 64.96414 134.7609 72.51039 131.4883 69.91563 139.6774 62.06387 136.5203 55.85605 136.7264 62.92091 128.0583 68.52739 133.6660 7!.5!332 12.6. 8328 66.89659 125.1306 54.97896 130.3827 67.01253 125.4930 57.99420 59.02080 53.58841 62.80959 53.43660 77.08174 53.99460 74.76999 52.95901 65.73141 52.59441 45.79526 54.55261 50.06990 54.55261 48.33029 53. 99460 56.45575 53.99460 66.06067 53.99460 64.44643 54.03030 60. 00150 53.99460 53. 86136 53.99460 63.14812 53.99460 65.05373 54.39491 61.15160 972.5349 55.20923 985.4678 58.57365 987.7759 71.24721 987.7871 69. 19441 973.3230 61.16820 990.5066 43.46506 1008,694 47.26093 1013.231 45.71617 1002. 309 52.93153 1036.474 61.46065 1017. 052 60.02721 1011.275 56.08017 992.6853 50.62779 991.'0242 58.87434 997.4863 60.56647 999.1982 57.10141 6030.004 161.6877 6000.367 161.1466 6043.453 160.3670 5985.637 159.7704 5966.437 159.1496 5984.832 158.5467 5946.039 158.0118 5959.902 157.4942 5891.141 156.9000 5908.211 156.4314 5895.805 155.9885 5803.082 155.5114 5755.098 155.0082 5748.305 154,5305 5699. 141 154.0409 5702.746 153.4790. ' :.'oeffo. ooo 28.06151 67.03914 129.7120 53.99460 59.97276 993.3860 56.05458 5615.750 152.4336 10770.000 24.96631 61,19530 125.5286 53.59430 61.07326 993.9751 57.03178 5606.125 151.8616 10720.000 26.46021 68.08151 129,7693 55,59410 63.80389 973.5820 59.45657 5549.793 151.3694 10670.000 26~97900 62,44232 134. 8084 55.03610 61.73102 1011.417 57.61586 5569.754 150.8420 10620.000 25.09041 60.58656 127.4838 55.00040 60.97153 988.6509 56.94144 5553.262 150.3457 !0570.000 25.42551 6!.60797 127.3857 55.43640 56.66348 1005,653 53. 11592 5565.676 149,8113 10520.000 26.07651 66.57802 124.7505 55.40070 51,66444 1004,648 48.67680 5519,332 149.2063 10470.000 25.02'831 55.94020 131.1489 55.95871 62.09480 1020.488 57.93890 5535°098 148.5899 !0420~000 24.63860 10370.000 32.73740 65.50148 '129,3975 131.8586 54.99451 57.01353 55,55251 43,54872 1016.801 53.42677 1040.849 41.47012 5538.965 148.1422 5525.789 147.4976 10320.000 21~33580 46.56253 125.8632 55,95280 72.64948 1041.818 67.31137 5512.437 147.0458 10270,-000 123. 9317 55. 58820 1068. 896 5547. 613 24,70331 . 123. 4104 67. 78697 62,99353 146. 4785 !0220.000 26.92540 84.66495 126.5284 55.95280 60,48099 1036o023 56.50589 5422.266 145,9765 10170.000 20,45810 106.5398 121.05!9 0.0000000E+00 94.60316 300.0000 86.80618 4500.000 145.4641 10120.000 30. 00000 !54.3666 100.0000 0. 0000000E+O0 4.152398 300.00O0 3,143527 4500. 000 144.9983 **** FILE TRAILER **** **** TAPE TRAILER **** LIS 89/10/01 3990 01 TOTAL RECORDS IN THIS LOGICAL TAPE : 545 **** REEL TRAILER LIS ATLAS 01 'TOTAL ~RECOPO$ IN THIS LOGICAL P~EEL : 546 TOTAL RECORDS IN THIS PHYSICAL .REEL: 546 End of execution: wed~ 4 OCT 89 2:t9p Elapsed execution time = ! minute ~ 0.1 seconds. SYSTEM RETURN CODE = 0 · ,.