Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-0457. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-26C Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-045 50-029-21987-03-00 12215 Sufrace Intermediate Liner Liner Liner 9034 2651 9807 289 474 2703 11756 13-3/8" 9-5/8" 5-1/2" 3-1/2" x 3-3/16" 2-3/8" 9035 34 - 2685 31 - 9839 9587 - 9876 9566 - 10040 9512 - 12215 34 - 2685 31 - 8534 8335 - 8564 8318 - 8688 8277 - 9034 11730, 12153 2260 4760 6820 10530 11780 11756 5020 6870 7740 10160 11200 10626 - 12199 4-1/2" 12.6# L-80 30 - 9589 9043 - 9033 Conductor 80 20" x 30" 34 - 114 34 - 114 4-1/2" Otis HCM Packer 9497, 8265 9497 8265 Torin Roschinger Area Operations Manager Michael Hibbert - (C) Michael.Hibbert@hilcorp.com PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 30 - 8336 N/A N/A 186 1155 16217 20908 21 113 550 1200 240 1100 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Kayla Junke at 9:17 am, May 02, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.05.01 15:16:02 -08'00' Torin Roschinger (4662) RBDMS JSB 050223 DSR-5/2/23WCB 1-4-2024 ACTIVITY DATE SUMMARY 4/25/2023 ***WELL FLOWING ON ARRIVAL*** DRIFT w/ 1.84" CENT, 1-3/4" SAMPLE BAILER TO DEVIATION @ 10,534' SLM (no issues) ***WELL S/I ON DEPARTURE*** 4/27/2023 LRS CTU #2 - 1.50" Blue Coil. Job Scope: Mill CIBP MIRU & MU 1-11/16" YJ milling BHA with 1.87" 4-blade junk mill. Freeze protect the flowline. L&K the tubing with 150 BBL's of KCL. RIH and tag top of CIBP at 10814' CTMD. Mill CIBP and push downhole to 11730' CTMD so as not to damage lower CIBP. Begin POOH. ...Continued on WSR 4-28-23... 4/28/2023 LRS CTU #2 - 1.50" Blue Coil ***Cont. from WSR 4-27-23*** Job Scope: Mill CIBP Continue POOH. FP well with Diesel. Rig Down CTU. ***Job Complete*** Daily Report of Well Operations PBU F-26C LRS CTU #2 - 1.50" Blue Coil. Job Scope: Mill CIBP MIRU & MU 1-11/16" YJ milling BHA with 1.87" 4-blade junk mill. Freeze protect the gj flowline. L&K the tubing with 150 BBL's of KCL. RIH and tag top of CIBP at 10814' g g CTMD. Mill CIBP and push downhole to 11730' CTMD so as not to damage lower CIBP. Begin POOH. The milled CIBP fish is shown correctly on the new WBS, below. -WCB DRIFT w/ 1.84" CENT, 1-3/4" SAMPLE BAILER TO DEVIATION @ 10,534' SLM (no issues) 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-26C Patch Tubing Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-045 50-029-21987-03-00 12215 Sufrace Intermediate Liner Liner Liner 9034 2651 9807 289 474 2703 10810 13-3/8" 9-5/8" 5-1/2" 3-1/2" x 3-3/16" 2-3/8" 9043 34 - 2685 31 - 9839 9587 - 9876 9566 - 10040 9512 - 12215 34 - 2685 31 - 8534 8335 - 8564 8318 - 8688 8277 - 9034 12153 2260 4760 6820 10530 11780 10810, 11756 5020 6870 7740 10160 11200 10626 - 12199 4-1/2" 12.6# L-80 30 - 9589 9043 - 9033 Conductor 80 20" x 30" 34 - 114 34 - 114 4-1/2" Otis HCM Packer 9497, 8265 9497 8265 Stan Golis Sr. Area Operations Manager Kirsty Glasheen Kirsty.Glasheen@hilcorp.com 907.564.5258 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 30 - 8336 N/A N/A 182 883 18259 9693 18 30 550 1000 221 199 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations ect to the best of my kn February 15, 2023 By Samantha Carlisle at 10:19 am, Feb 15, 2023 DSR-2/15/23 RBDMS JSB 022123 213-045 WCB 11-20-2023 Repair Well PRUDHOE BAY, PRUDHOE OIL Patch Tubing PBU F-26C Sundry Number N/A ACTIVITY DATE SUMMARY 7/31/2022 T/I/O=5/250/190 Assist Slickline w/ Load & Test (PATCH TUBING / LINER) ***CMIT-TxIA to 2142 psi PASS*** Target = 2000 psi Max Applied = 2250 psi Pumped 150 bbls crude down Tbg for load. Pumped 34 bbls crude down Tbg/IA for CMIT. Took Tbg/IA to 2257/2258 psi. Tbg/IA lost 96/46 psi in 1st 15 mins and 19/20 psi in 2nd 15 mins for a loss of 115/66 psi in 30 min test. PASS. Bled Tbg/IA to 350/380 psi and got back~8 bbls. ***Job Cont 08-01-22 WSR*** 7/31/2022 ***WELL S/I ON ARRIVAL*** PULLED 4 1/2" PX PLUG FROM 9,473' MD BRUSHED 2 7/8" X NIPPLE @ 9,528' MD BRUSHED 4 1/2" TUBING WHILE LRS LOADED W/ 150 BBLS OF CRUDE. SET 2.31" XX PLUG @ 9528' MD. LRS TO CMIT 2000 PSI (PASSED). ***WSR CONTINUED ON 8-1-22*** 8/1/2022 ***Job Cont from 07/31/2022 WSR*** (PATCH TUBING / LINER) CMIT-TxIA to 2133 psi ***PASS*** Target = 2000 psi Max Applied = 2250 psi Pumped 13.5 bbls crude down Tbg/IA for CMIT-TxIA. Took Tbg/IA to 2239/2266 psi. Tbg/IA lost 83/63 psi in 1st 15 mins and 23/24 psi in 2nd 15 mins for a total loss of 106/87 psi in 30 min test. PASS. Bled Tbg/IA to 195/300 psi and got back ~8 bbls. FWHPs=250/250/190 8/1/2022 ***WSR CONTINUED FROM 7-31-22*** PULLED 2.31" XX PLUG FROM 9528' MD. SET 3.81" x 2.31" X NIPPLE REDUCER @ 9473' MD. SET 2.31" XX PLUG @ 9473' MD. LRS TO CMIT 2000 PSI (pass) RAN 20' x 3.70" DUMMY WHIP STOCK TO NIPPLE REDUCER @ 9473 MD ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF STATUS*** 8/3/2022 T/I/O = 245/290/200 (PATCH TUBING / LINER) Attempt MIT-T. Pressure test Tbg patch/plug to 2000 psi ***Failed*** Pumped 1.9 bbls crude to reach max applied 2250 psi. Pumped 1.4 bbls crude for LLR of ~6.5 gal/min at 2250 psi. Bled back 3.0 bbls. Tag hung and dso notified FWHP's = 245/290/200 8/3/2022 WELL SHUT IN ON ARRIVEL SET PATCH FROM 9377'-9393,7' MD ME TO ME , CCL STOP DEPTH=9364.2' MD, CCL TO TOP ME=12.8', TIE INTO HES LDL DATED 22-SEPT-2021. MIT-T FAILED, LRS ESTABLISHES 6.5 LLR WITH IA SHUT IN. CONTINUED ON 8/4/2022 WSR 8/4/2022 ***CONTINUED FROM 8/3/2022 WSR***(leak detect) T-BIRD ESTABLISHES LLR OF 3 to 2 GPM AT 3000/150/150# PUMPING DOWN TUBING AND TAKING RETURNS UP ANNULUS TO FLOWLINE. LOG 120 FPM BASELINE PASS FROM SURFACE TO 9471' MD, PUMPED 5 BBLS WHILE PERFORMING SPIN/TEMP/PRESS STATION STOP. NO CHANGE, LOG 100 FPM UP FROM PLUG, LEAK TOO SMALL FOR SPINNER. LOG 120 FPM DYNAMIC DOWN PUMPING PASS FROM 2050' TO PLUG WHILE PUMPING. TEMP ANNOMALY SEEN AT DOME VALVE AT 3092' MD, PATCH AT 9377' MD AND GLM AT 9445' MD . RESULTS INCONCLUSIVE. T-BIRD USED 16.2 BBLS OF CRUDE TOTAL. ***WELL LEFT S/I, PAD OP NOTIFIED ON DEPARTUE*** Daily Report of Well Operations PBU F-26C LRS TO CMIT 2000 PSI (pass) ( ***CMIT-TxIA to 2142 psi PASS*** Target = 2000 psi PULLED 2.31" XX PLUG FROM 9528' MD. SET 3.81" x 2.31" X NIPPLE REDUCER @ 9473' MD. Attempt MIT-T. Pressure test Tbg ()g patch/plug to 2000 psi ***Failed*** Pumped 1.9 bbls crude to reach max applied 2250 g psi. Pumped 1.4 bbls crude for LLR of ~6.5 gal/min at 2250 psi SET 2.31" XX PLUG @ 9528' MD AT DOME VALVE AT 3092' MD, PATCH AT 9377' MD AND GLM AT 9445' MD . RESULTS INCONCLUSIVE. BRUSHED 2 7/8" X NIPPLE @ 9,528' MD BRUSHED 4 1/2" TUBING WHILE LRS LOADED W/ 150 BBLS OF CRUDE. @ MIT-T FAILED, LRS ESTABLISHES 6.5 LLR WITH IA SHUT IN SET PATCH FROM 9377'-9393,7' MD SET 2.31" XX PLUG @ 9473' MD. @ PULLED 4 1/2" PX PLUG FROM 9,473' MD LRS TO CMIT 2000 PSI (PASSED). @ LEAK TOO SMALL FOR SPINNER Daily Report of Well Operations PBU F-26C 8/4/2022 T/I/O=550/275/150 (Assist E-line with LDL) TFS U-3, PUMPED 16 BBLS CRUDE TO ASSIST E-LINE W/LDL, FWHP= 500/200/150, E-line still on well upon departure. 1/24/2023 ***WELL S/I ON ARRIVAL*** (patch tubing / liner) T-BIRD PERFORMED CMIT-TxIA TO 1900 PSI **PASS** T-BIRD ATTEMPTED MIT-T TO 1900 PSI **FAIL** (established LLR of 2 GPM) SET 4-1/2" LTTP IN TOP OF PATCH @ 9377' MD (28" OAL) T-BIRD ATTEMPTED MIT-T TO 1900 PSI **FAIL** (same LLR of 2 GPM) PULL RK-LGLV FROM STA# 5 AT 3,092' MD ATTEMPT TO SET RK-DGLV IN STA # 5 AT 3,092' MD (dropped valve) ***CONT ON 1/25/23 WSR*** 1/24/2023 T/I/O=349/389/187 (Assist Slickline) TFS U-3, CMIT-TxIA ***PASS*** Pumped 6.9 BBLS to reach MAX PSI of 1905 PSI, 1st 15 min TBG/IA lost 38/38 PSI, 2nd 15 min TBG/IA lost 16/16 PSI, total loss of 54/54 PSI on the TBG/IA. Pumped 1.7 BBLS down TBG to establish LLR of 2 GPM. ***Job Continued on 1-25-23*** 1/25/2023 ***CONT FROM 1/24/23 WSR*** (patch tubing / liner) FISH DROPPED RK-DGLV FROM LTTP AT 9,377' MD (see log) SET RK-DGLV AT STA# 5 (3,092' md) T-BIRD ATTEMPTED MIT-T TO 1900 PSI **FAIL** (leak rate has decresed f/ 2 gpm to approx 16oz pm) RAN 4-1/2" D&D HOLE FINDER AT MULTIPLE SPOTS (IA still tracking, see log) PULL RK-OGLV AT STA# 4 (5,861' md) & SET RK-DGLV ***CONT ON 1/26/23 WSR*** 1/25/2023 ***Job Continued from 1-24-23*** (Assist Slickline) TFS U-3, Multiple MIT-T's done as well as pressure tests on TBG with hole finder, see log for details. ***Job Continued on 1-26-23*** 1/26/2023 ***CONTINUED FROM 1/25/23 WSR*** (Patch tubing / liner) T-BIRD PERFORMED FAILING MIT-T TO 1,900 psi (IA still slightly gaining during tests). EQUALIZE & PULL 2.813" CAT STANDING VALVE FROM 9,352' SLM. JOB INCOMPLETE, WILL RETURN WHEN NEW PLAN FORWARD IS PUT TOGETHER. ***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS*** 1/26/2023 ***Job Continued from 1-25-23*** (Assist Slickline) TFS U-3, Multiple attempts for MIT-T ***Failed***. TBG and IA communication LLR less than 0.5 gal/min. See log for details. FWHP= 490/330/187 1/28/2023 Asisst Eline with LDL Job Cancelled 1/31/2023 TFS Unit 4 Weather Standby 2/1/2023 TFS Unit 4 Weather Standby (g) T-BIRD PERFORMED FAILING MIT-T TO 1,900 psi (IA still slightly gaining during tests). Pumped 1.7 BBLS down TBG to establish LLR of 2 GPM. Multiple attempts for () MIT-T ***Failed***. TBG and IA communication LLR less than 0.5 gal/min. ) RAN 4-1/2" D&D HOLE FINDER AT MULTIPLE SPOTS (IA still tracking, see log) Daily Report of Well Operations PBU F-26C 2/4/2023 ***WELL S/I ON ARRIVAL*** LOG BASELINE TEMPERATURE PASS TO XX PLUG AT 9473' MD. BLEED DOWN ANNULUS AND PRESSURE UP TUBING TO ~2600psi WITH T- BIRD ASSIST. UNABLE TO ESTABLISH LLR, PERFORM PASSING MIT-T AFTER BLEEDING ENERGIZED FLUID OUT OF ANNULUS. BEGIN LOGGING TO SURFACE AT 30 FPM PERFORMING STATION STOPS BELOW AND ABOVE ALL JEWELRY WITH ~2500psi DIFFERENTIAL ACROSS TUBING AND IA.(see T-bird pump report) NO LEAK SIGNATURE SEEN IN WELLHEAD. RIG DOWN WIRELINE AND T-BIRD PERFORMS SOLID MIT-T TO 2750# ON TUBING. ZERO PRESSURE CHANGE AFTER 30 MINS WITH ANNULUS ISOLATED FROM FLOWBACK TANK.(see T-bird pump report) ***JOB COMPLETE / WELL LEFT SHUT IN*** 2/4/2023 T/I/O= 750/400/175 Temp= SI Assist ELine with LDL Pumped 3.4 bbls crude down TBG taking returns up IA and out to open top tank ***Job cont to 02-05-23 WSR*** 2/5/2023 ***Job continued from 2-4-23 WSR*** MIT-T to 2626 psi max applied ***PASS*** 1st 15 min Tbg lost 0 psi 2nd 15 Tbg lost 0 psi Bled back ~1.5 bbls crude Tags hung Eline in control per departure FWHP's=650/0/175 2/6/2023 ***WELL S/I ON ARRIVAL*** (Patch tbg liner) SET 4 1/2" WHIDDON @ 9,377' MD ***CONTINUED ON 2/7/23 WSR*** 2/7/2023 ***CONTINUED FROM 2/6/23 WSR*** (Patch tubing liner) PULL RK-DGLV FROM STA# 4 (5,861' md) & STA# 5 (3,092' md) SET RK-LGLV AT STA# 5 (3,092' md) & RK-OGLV AT ST # 4 (5,861' MD) PULLED EMPTY WHIDDON AT 9,373' MD RAN 2 7/8" X EQ PRONG TO 2.31" XX PLUG AT 9,473' MD (no indication of eq) ***CONTINUED ON 2/8/23 WSR*** 2/8/2023 ***CONTINUED FROM 2/7/23 WSR*** (Patch tubing liner) RAN 10'x2.25" PUMP BAILER TO 2.31" XX PLUG AT 9,473' MD RAN GS CORE & 2 7/8" X EQ PRONG TO XX PLUG AT 9,473' MD (Still no sign of eq) PULLED 2.31" XX PLUG FROM NIPPLE REDUCER @ 9,473' MD (Eq ports plugged w/ glv packing) ***WELL S/I ON ARRIVAL, NOTIFY DSO OF WELL STATUS*** ) PULLED 2.31" XX PLUG FROM NIPPLE REDUCER Job continued from 2-4-23 WSR*** MIT-T to 2626 psi max applied ***PASS*** PERFORM PASSING MIT-T AFTER BLEEDING ENERGIZED FLUID OUT OF ANNULUS. BEGIN LOGGING TO SURFACE AT 30 FPM PERFORMING STATION STOPS BELOW AND ABOVE ALL JEWELRY WITH ~2500psi DIFFERENTIAL ACROSS TUBING AND IA.(see T-bird pump report) NO LEAK SIGNATURE SEEN IN WELLHEAD. RIG DOWN WIRELINE AND T-BIRD PERFORMS SOLID MIT-T TO 2750# ON TUBING. ZERO PRESSURE CHANGE David Dempsey Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.dempsey2@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 09/28/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20220928 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# BCU 07A 501332028401 214060 7/12/2022 AK E-Line CIBP GPT BCU 18RD 501332058401 222033 7/13/2022 AK E-Line Perf BCU 18RD 501332058401 222033 7/16/2022 AK E-Line GPT Perf BCU 18RD 501332058401 222033 7/23/2022 AK E-Line GPT CIBP Perf BRU 212-24 502832003700 172015 6/27/2022 AK E-Line CBL BRU 212-24 502832003700 172015 7/5/2022 AK E-Line CIBP CBL TBG END 1-45 500292199100 189124 7/23/2022 AK E-Line Perf END 4-02 500292178900 188022 7/21/2022 AK E-Line Perf HVB B-16 502312004000 212133 6/23/2022 AK E-Line Drift, Plug, Cement IRU 241-01 502832018400 221076 8/5/2022 AK E-Line CBL IRU 241-01 502832018400 221076 8/9/2022 AK E-Line Perf Kalotsa 6 501332068500 219114 7/16/2022 AK E-Line Perf KTU 24-06H 501332049000 199073 7/15/2022 AK E-Line GPT Perf MPU S-34 500292317100 203130 7/5/2022 AK E-Line Drift PBU F-26C 500292198703 213045 8/4/2022 AK E-Line Patch/LDL SRU 213-15 501332065200 215100 8/3/2022 AK E-Line GPT Perf Please include current contact information if different from above. T37068 T37069 T37069 T37069 T37070 T37070 T37071 T37072 T37073 T37081 T37081 T37074 T37075 T37076 T37077 T37078 PBU F-26C 500292198703 213045 8/4/2022 AK E-Line Patch/LDL Kayla Junke Digitally signed by Kayla Junke Date: 2022.09.30 12:44:16 -08'00' From:Regg, James B (CED) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: Producer F-26C (PTD #2130450) Tubing Leak Date:Tuesday, September 28, 2021 12:45:14 PM Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Sent: Tuesday, September 28, 2021 11:00 AM To: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>; Regg, James B (CED) <jim.regg@alaska.gov> Cc: Stan Golis <sgolis@hilcorp.com>; Wallace, Chris D (CED) <chris.wallace@alaska.gov> Subject: NOT OPERABLE: Producer F-26C (PTD #2130450) Tubing Leak Mr. Regg, Producer F-26C (PTD # 2130450) had a plug set at 9473' on 9/16/21 with a failing MIT-T and passing CMIT-TxIA to 2708 psi. On 9/22/21 a leak detection log found a hole in the tubing at 9384’. The well is now classified as NOT OPERABLE and will remain shut-in until the primary barrier can be restored. Please call with any questions or concerns. Oliver Sternicki Hilcorp North Slope LLC Well Integrity Engineer Office: (907) 564 4891 Cell: (907) 350 0759 Oliver.Sternicki@hilcorp.com From: Alaska NS - PB - Field Well Integrity Sent: Tuesday, September 14, 2021 5:42 PM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Stan Golis <sgolis@hilcorp.com>; chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Subject: UNDER EVALUATION: Producer F-26C (PTD #2130450) Sustained Casing Pressure IA Mr. Regg, Producer F-26C (PTD # 2130450) was reported by operation and found to have 2250 psi on the IA when shut in on 09/14/21. A subsequent TIFL failed confirming failure of one or more well barriers. The well is now classified as UNDER EVALUATION and on a 28 day clock to be resolved. Plan Forward: 1. Slickline: Set TTP 2. Fullbore: Load Tubing & IA, MIT-T and CMIT-TxIA 3. Well Integrity: Further diagnostics as required. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: Alaska NS - PB - Field Well Integrity Sent: Tuesday, August 25, 2020 6:22 AM To: Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>; Alaska NS - PB - EOC Specialists <EOCSpecialists@hilcorp.com>; Alaska NS - PB - Wells Optimization Engineers <WellsOE@hilcorp.com>; Alaska NS - PB W - GC1 - Field Lead Operator <GC1FieldLO@hilcorp.com>; Alaska NS - PB W - GC1 - Foreman <GC1Foreman@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad DG <AlaskaNS-PBW-GC1WellpadDG@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad EK <AlaskaNS-PBW- GC1WellpadEK@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad F <AlaskaNS-PBW- GC1WellpadF@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad YP <AlaskaNS-PBW- GC1WellpadYP@hilcorp.com> Cc: Stan Golis <sgolis@hilcorp.com>; Noel Nocas <Noel.Nocas@hilcorp.com>; Wyatt Rivard <wrivard@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Aras Worthington <Aras.Worthington@hilcorp.com>; John Menke <jmenke@hilcorp.com> Subject: OPERABLE: Producer F-26C (PTD #2130450) IA re-pressurization resolved All, Producer F-26C (PTD # 2130450) gas lift valves were replaced on 08/19/20. DHD bled the IA on 08/24/20 and observed no liquid level movement or IA re-pressurization. The well is now classified as OPERABLE. Please respond with any questions. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: Alaska NS - PB - Field Well Integrity Sent: Thursday, August 6, 2020 4:01 PM To: Alaska NS - PB - EOC Specialists <EOCSpecialists@hilcorp.com>; Alaska NS - PB - Wells Optimization Engineers <WellsOE@hilcorp.com>; Alaska NS - PB W - GC1 - Field Lead Operator <GC1FieldLO@hilcorp.com>; Alaska NS - PB W - GC1 - Foreman <GC1Foreman@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad DG <AlaskaNS-PBW-GC1WellpadDG@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad EK <AlaskaNS-PBW-GC1WellpadEK@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad F <AlaskaNS-PBW-GC1WellpadF@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad YP <AlaskaNS-PBW- GC1WellpadYP@hilcorp.com> Cc: Stan Golis <sgolis@hilcorp.com>; Noel Nocas <Noel.Nocas@hilcorp.com>; Wyatt Rivard <wrivard@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Aras Worthington <Aras.Worthington@hilcorp.com>; John Menke <jmenke@hilcorp.com> Subject: UNDER EVALUATION: Producer F-26C (PTD #2130450) Tubing x Inner Annulus Communication All, Producer F-26C (PTD # 2130450) is exhibiting signs of TxIA communication. The IAP BUR was observed to be ~100 psi / day. The well is now classified as UNDER EVALUATION and is on the 28 day clock for diagnostics. Casing pressure did not exceed NOL and no agency reporting is required. Plan forward: 1. Slickline: Change out OGLV 2. Operations: Put on Production 3. DHD: warm TIFL 4. Field Well Integrity: Additional diagnostics as needed Please respond with any questions. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. From:Regg, James B (CED) To:AOGCC Records (CED sponsored) Subject:FW: UNDER EVALUATION: Producer F-26C (PTD #2130450) Sustained Casing Pressure IA Date:Wednesday, September 15, 2021 11:44:07 AM reviewed Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com> Sent: Tuesday, September 14, 2021 5:42 PM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Stan Golis <sgolis@hilcorp.com>; Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Subject: UNDER EVALUATION: Producer F-26C (PTD #2130450) Sustained Casing Pressure IA Mr. Regg, Producer F-26C (PTD # 2130450) was reported by operation and found to have 2250 psi on the IA when shut in on 09/14/21. A subsequent TIFL failed confirming failure of one or more well barriers. The well is now classified as UNDER EVALUATION and on a 28 day clock to be resolved. Plan Forward: 1. Slickline: Set TTP 2. Fullbore: Load Tubing & IA, MIT-T and CMIT-TxIA 3. Well Integrity: Further diagnostics as required. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: Alaska NS - PB - Field Well Integrity Sent: Tuesday, August 25, 2020 6:22 AM To: Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>; Alaska NS - PB - EOC Specialists <EOCSpecialists@hilcorp.com>; Alaska NS - PB - Wells Optimization Engineers <WellsOE@hilcorp.com>; Alaska NS - PB W - GC1 - Field Lead Operator <GC1FieldLO@hilcorp.com>; Alaska NS - PB W - GC1 - Foreman <GC1Foreman@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad DG <AlaskaNS-PBW-GC1WellpadDG@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad EK <AlaskaNS-PBW- GC1WellpadEK@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad F <AlaskaNS-PBW- GC1WellpadF@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad YP <AlaskaNS-PBW- GC1WellpadYP@hilcorp.com> Cc: Stan Golis <sgolis@hilcorp.com>; Noel Nocas <Noel.Nocas@hilcorp.com>; Wyatt Rivard <wrivard@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Aras Worthington <Aras.Worthington@hilcorp.com>; John Menke <jmenke@hilcorp.com> Subject: OPERABLE: Producer F-26C (PTD #2130450) IA re-pressurization resolved All, Producer F-26C (PTD # 2130450) gas lift valves were replaced on 08/19/20. DHD bled the IA on 08/24/20 and observed no liquid level movement or IA re-pressurization. The well is now classified as OPERABLE. Please respond with any questions. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: Alaska NS - PB - Field Well Integrity Sent: Thursday, August 6, 2020 4:01 PM To: Alaska NS - PB - EOC Specialists <EOCSpecialists@hilcorp.com>; Alaska NS - PB - Wells Optimization Engineers <WellsOE@hilcorp.com>; Alaska NS - PB W - GC1 - Field Lead Operator <GC1FieldLO@hilcorp.com>; Alaska NS - PB W - GC1 - Foreman <GC1Foreman@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad DG <AlaskaNS-PBW-GC1WellpadDG@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad EK <AlaskaNS-PBW-GC1WellpadEK@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad F <AlaskaNS-PBW-GC1WellpadF@hilcorp.com>; Alaska NS - PB W - GC1 Wellpad YP <AlaskaNS-PBW- GC1WellpadYP@hilcorp.com> Cc: Stan Golis <sgolis@hilcorp.com>; Noel Nocas <Noel.Nocas@hilcorp.com>; Wyatt Rivard <wrivard@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Aras Worthington <Aras.Worthington@hilcorp.com>; John Menke <jmenke@hilcorp.com> Subject: UNDER EVALUATION: Producer F-26C (PTD #2130450) Tubing x Inner Annulus Communication All, Producer F-26C (PTD # 2130450) is exhibiting signs of TxIA communication. The IAP BUR was observed to be ~100 psi / day. The well is now classified as UNDER EVALUATION and is on the 28 day clock for diagnostics. Casing pressure did not exceed NOL and no agency reporting is required. Plan forward: 1. Slickline: Change out OGLV 2. Operations: Put on Production 3. DHD: warm TIFL 4. Field Well Integrity: Additional diagnostics as needed Please respond with any questions. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notifiedthat any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. STATE OF ALASKA HLUUVED ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate ❑ Pull Tubing ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Operations shutdown .'o%moi❑ Change Approved Program - --'❑ Other: Set CIBP 0 2. Operator Name: SP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number. 213-045 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number. 50-029-21987-03-00 7. Property Designation (Lease Number): ADL 028280 8. Well Name and Number: PBU F -26C 9. Logs (List logs and submit electronic and panted data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11, Present Well Condition Summary: Total Depth: measured 12215 feet Plugs measured 10810, 11756 feet true vertical 9034 feet Junk measured 12153 feet Effective Depth: measured 10810 feet Packer measured 9497 feet We vertical 9043 feet Packer true vertical 8265 feet Casing. Length: Size: MD: TVD: Buret: Collapse: Conductor 80 20" x 30" 34-114 34-114 Surface 2651 13-3/8" 34-2685 34-2685 5020 2260 Intermediate 9807 9-5/8" 32-9839 32-8535 6870 4760 Liner 289 5-1/2" 9587-9876 8335-8564 7740 6280 Liner 474 3-1/2" x 3-3/16" 9666-10040 8310-8688 10160 10530 Liner 2704 2-3/8" 9511-12215 8276-9034 Perforation Depth: Measured depth: 10626 - 12199 feet True vertical depth: 9043 - 9033 feet Tubing (size, grace, measured and true vertical depth) 4-1/2" 12.6# L-80 30-9589 30-8336 Packers and SSSV (type, measured and 4-1/2" HCM Packer 9497 8265 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 287 30608 24 0 1042 Subsequent to operation: 777 7436 36 0 177 14.Attachments: (reemree nm 20 MC 25.07025.071. a 25.293) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ I GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Haffener, Jordan Contact Name: HaOener, Jordan Authorized Title: Production Engineer Contact Email: JOrdan.Haffener(Mbp.com Authorized Signature: Date: i0 17 ZO/G Contact Phone: +1 9075645383 Form 10-404 Revised 04/20{7 Will ��wt "? iBDMS1�.1UN 19 2019 Submit Original Only Daily Report of Well Operations PBU F -26C ACTIVITvnATG ci u.....,., CTU #8 / 1.50" Coil / Job Objective: Set CIBP & Adperf MIRU. Kill well with 1% slick KCI. RIH with HES memory GR/CCL toolstring. Start logging up from 10,900' 5/20/2019 **Continued on 5/21/19 WSR** CTU #8 / 1.50" Coil / Job Objective: Set CIBP & Adperf Log up at 50 ft/m from 10,900' to 10,300'w/ memory GR/CCL. POOH. MU & RIH w/ 2-3/8" Baker CIBP and set to of CIBP at 10,810'. POOH. MU & RIH with HES 1.56" x 32' Perfecta gun (#1). Perforate 10658' - 10,690' ctm. RI with HES 1.56" x 32' Perfecta gun (#2). Perforate 10,626'- 10 658' CTM. POOH. hots iced and ball recovered. RDMO 2112019 ** Job Com tete ** TAff= 4-1/16'CIW WELLHEAD MCEVOY ACTUATOR BAKERC OKE. E -EV , 67.71' BF. E -EV = 36.09' KOP= 3091' Max An& 2 94'0 11493' DahmMD= 1024V DatunTVD1 8800' SS X 30' L-80 BI/IT. ID =1 Minimum ID = 1.92" @ 9539' 2-7/8"X 23/8" LINER XO PIN 4112- BKR 45 KB LTP, ID = 2.37' (06/06/13) 1 4-12' TBG, 12.68, L-80 TDB, .0152 bpf, D= 3.958' .0086 bpf, O = -BU NSGG, IO = .0232 bpf. ID = PERFORATIONSUMMARY REF LOG: MEA CNL CN 05/30/13 ANGLEATTOP Pf32F: 88'@ 106M Note: Refer to Productbn DD for historical perf data SfLE SPF ME2VAL OpNSgz SHOT SOZ 1.59' 6 10626 - 10690 O 0521/19 08/07/13 1-56' 6 10870 - 10900 C 05/20/15 RK 1.56' 6 10985 - 11045 C 05/19/15 MACOD 1.56' 6 11100 - 11220 C 1020/13 8117 1.56" 6 11375 -11405 C 05/30114 12114/89 1.56' 6 11800 - 11890 C 0729/13 RK 1.56" 6 11999 - 12199 C 05131113 4.4', L-80 HYD 511, .0039 bpf, F-2 6 ■ _ SAFETY NOTES: WELL ANGLE > 70° @ 10482" V V MAX DOGLEG 30.6' @ 10497- T— I . 0497—TT. -'I OT IS SSSV MP, O = 3 GAS LFT MANn RR S ST MD I ND I DEV I TYPE I VLV I LATCH I FORT DATE 5 3092 3091 10 CAMCO DOME RK 16 08/07/13 4 5861 5387 39 CAMCO SO RK 20 06/07/13 3 8149 7199 35 MACOD DMY RK 0 12/14/89 2 9304 8117 39 MAOCO DMY RK 0 12114/89 1 9445 8225 40 MACCO DML' RK 0 12/14/89 ag F 14-12" OTS X MP, ID = 3.813- 13-3/4- OFPLOV SLV,ID=3.00' 4-12" OTIS XN NIP, MLLE) TO 3.80' 3-12' HES X NIP, ID = 2.813' BEHIND 3-12" X 3-3/18' XO, ID = 2.805' 1 CT LNR 5-12' LNR MLLOUT WMOW (F-266) 9876 - 9882' 3-3/16- LNR MILLOUT WNDOW (F -26C) 10040' - 10046' Y DATEPC�WJIIME COMMENTS DATE REV BY COMMENTS 12/14189C INTIAL COMPLETION 0520/15 JCF/PJC TAG CBR' ADPEtFS (05/19-20(15) 18/04198C CTD SIOETRACK(F-26A) 03/13117 JU.MD SETXXPLUG(03/10/17) 0625/03C CTOSIDETRACK(F-266) 04103/17 WJMD PULLEDXXPLUG(04/01/17) 06101/13C CTO SIDETRACK (F -26C) 0528/19 BGfWD ADPEFS B SET C13P 11/01/13 WE MlU-CBR'AIWERF/CBP(10/18-20/1 06/12/19 DDUM) ADD BfE, GOND IFF -0, EDIT FISH 08/03/14ADPEtFS (05/30114) e- BOT CIBP (TAGGED 05120/15 2-318" CBR MILLED & RUSHED I PRUDHOE BAY UNIT WE -L: F -26C FERNOT No:'2130450 AR No: 50-029-21987-03 SED 2, T11 N, R1 3F- 214U TSL & 2197' FEL BP Exploration (Alaska) RECEIVED STATE OF ALASKA JUN 1 7 2015 F. ,KA OIL AND GAS CONSERVATION COMM JON • REPORT OF SUNDRY WELL OPERATIONS AOGCC 1 Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubin❑ Operations shutdown ❑ Performed Suspend ❑ Perforate Q Other Stimulate ❑ Alter Casin❑ Change Approved Program E Plug for Redrill n'erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other n 2 Operator 4.Well Class Before Work 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Development Q Exploratory ❑ 213-045-0 3 Address P 0 Box 196612 Stratigraphic ❑ Service ❑ 6 API Number Anchorage,AK 99519-6612 50-029-21987-03-00 7 Property Designation(Lease Number). 8 Well Name and Number ADL0028280 PBU F-26C 9 Logs(List logs and submit electronic and pnnted data per 20AAC25 071). 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 12215 feet Plugs measured 11750 feet true vertical 9033 69 feet Junk measured 12153 feet Effective Depth measured 11750 feet Packer measured See Attachment feet true vertical 9034 6 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 29 47-109 47 29 47-109.47 0 0 Surface 2655 7 13-3/8"68#L-80 30 12-2685 82 30 12-2685 79 5020 2260 Intermediate 9808 02 9-5/8"47#NT-80 31 62-9839 64 31 62-8534 85 6870 4760 Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10870-10900 feet 10985-11045 feet 11100-11160 feet 11160-11220 feet 11375-11405 feet 11800-11890 feet 11999-12199 feet True Vertical depth 9041 92-9041 94 feet 9042-9041 95 feet 9040 93-9040 27 feet 9040 27-9040 86 feet 9044 16-9044 05 feet 9033 26-9031 88 feet 9031 95-9033 29 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#L-80 27 86-9589 37 27 86-8336 37 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured). S ANMEQ , , •f i, `I t,i s RG ,iii-- .1 L II 1 Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 383 24629 21 0 1060 Subsequent to operation 769 26683 73 0 1190 14 Attachments(required per 20 MC 25 070 25 071,8 25 293) 15 Well Class after work Daily Report of Well Operations ❑ Exploratory Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16 Well Status after work Oil Q Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt. N/A Contact Nita Summerhays Email Nita.SummerhaysCa�bp corn Printed Name Nita Summerhays Title Data Manager �. Signatur /���i -', Phone 564-4035 Date 6/17/2015 1(71.- 7111RBDM JUN 2 5 2015 Ag r/ls Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0028280 ACTIVITYDATE SUMMARY CTU#8- 1.5" Coil Job Objective:AddPerf MIRU CTU. Make up drift BHA w/ 1.75" DJN. RIH loading well with diesel w/776. 5/18/2015 ...Continued on WSR 5-19-15... CTU#8- 1.5" Coil ***Continued from WSR 5-18-15*** Job Objective:Add Perf RIH with 1.75" drift DJN. Tag CIBP at 11756' CTMD. Pick up 50'and paint white/yellow flag. Notice weight bobbles between bottom perf and CIBP. POOH. Make up 1.69" memory GR/CCL and RIH. Tag plug lightly—lkdown, log from compression at 50fpm up to 10,899.8', paint white/blue flag for tie in, log up to 9800'. POOH. MU/RIH with 30' of 1.56" HSD Guns with 1606 PJ charges (perf gun run 1). Correct to flag depth at 10921.25. Tag CIBP, PU weight and correct depth to 11755.3'. PUH and perforate 11015-11045'. POOH. MU/RIH with 30'of 1.56" HSD Guns with 1606 PJ charges (pert gun run 2). Correct to flag depth at 10700.1'. Tag CIBP, PU weight and correct depth to 11755.3'. PUH and perforate 10985-11015'. POOH. Make up gun run#3 with 1.56" HSD x 30', 6 spf perf gun and RIH. 5/19/2015 ...Continued on WSR 5-20-15... CTU#8- 1.5"Coil ***Cont. from WSR 5-19-15*** Job Objective:AddPerf Cont. RIH with 1.56" x 30', 6 spf pert gun. Tag CIBP at 11756'and correct depth. PUH and perforate 10870'-10900'. POOH attempting to POP well to tanks. At surface and unable to POP well. Pad Op will backflow once unit leaves. RDMO CTU. 5/20/2015 ***Job Complete*** FLUIDS PUMPED BBLS I64 DIESEL W/776 107 50/50 METH 69 SLICK I% KCL 340 TOTAL a, a o LO CD 0 0 0 0 co 0, m0 r O N N L1) O r- CO N N- U 0o S' 0 o O O i N- CO CO N co 7 CO r` O dr CO CO N- LC) CO LC) V L() N V 1- O) CO LO N Ns CO O LC) 1 O N- CO N- O O O co O c CO 00 co CO O O N M CO LC) N N CO LC) CO CO co O CO ti c- CO CO CO 00 CO CO N CO CO to 00 H N- N CO O M N CO CO N- CO LC) Cfl CO r OO O) 7. aO O Ll) O) I-- 00 N M O f� O (3) 1- N N CO N N CO CO CO CO N O OO OO OO OO OO Co CO CO O CO CT) 0 O O CO CA 1- O CO CO V O N- CO CO N- CO CO O N- LU LC) cO 00 Ln Ln LC) co c) O L!) CO M O) O) O O) 6) N O) M Ln 00 0) O) Vi as O QCON 00 O C) CO co N O) Q' to N ON co000000oo) covOv O N co in LC) to to L[) co N O CO c- CO •r CM (NI 0) 0) 0) 0) 0) CO LO (00) 0) C ▪ O J J J J J J 3.1 00000 ▪ Q co0oOoCO � coCLn_ a_ L � co co co J , U) U) U) U) U) _O oZwJJJ1* * * COCO0 N x Q' C)J (D O N U U U U U � fn = V - �- Q Q Q Q Q b � Yooc\ NcoM - 2222 V � � i L7)< ninintoto N Ch N N N N N N � i i i i i L rr ( CO 10 Cfl N OOO O O N O LC) CO 0 0 0 0 O) a) O) N N O) J W CC ~ Q FA 0 W W U U o f2 Z ijj 111 > > > > > Z W W W W W W (0 J J J J J Z Z Z Z Z OU Z J J J J J (/) H > > > > > Packers and SSV's Attachment ADL0028280 SW Name Type MD TVD Depscription F-26C PACKER 9497.51 8265.41 4-1/2" HCM Packer F-26C PACKER 9511 8275.76 4-1/2" Baker KB LT Packer TREE= 4-1/16" O vuaE F-26C 6 C LrfaD �ncvoY — s !Y NOTES:WELL ANGLE>70°@ 10482"•°• ACTL4A.TOR BAILER C MAX DOGLEG:30.6"@ 1049T'" OIB.BEV 67.71' I [11 BF.ELB/= 38.61 2112' H4-1/2"OTIS SSSV N KOP_ 3091 P,D=3.813' Max Angle= 94"@ 11493' 20"CONDUCTOR ® 0 COGAS LFT MANDRELS Datum MD= 10248' —#. ST M) ND CEV TYPE VLV LATCH FORT DATE Lbtum ND 8800'SS D= 5 3092 3091 10 C/AMCO DOLE FE 16 06/07/13 4 5861 5387 39 CAMCO SO RK 20 06/07/13 13-3/8"CSG,68#,L-80 BUTT,D=12.415" H 26$6' 3 8149 7199 35 MACCO DMY RK 0 12/14/89 2 9304 8117 39 MACCO DMY RK 0 12/14/89 1 9445 8225 40 MACCO DMY RK 0 12/14/89 Minimum ID = 1.92" @ 9639' 9473' H4-1/2"011SXMP,D=3.813' 2-7/8" X 24/8" LINER XO PIN 9480' -14-12"OTIS SBR OVERSHOT OM 9497' -19-5/8"X 4-12'OTtS PKR,D=3.85" 4-12"BKR 45 KB LTP,D=2.37"(06/06/13) —1 9511' F 9512' _--13.70*[CLOY SLEEVE,D=3.00" f9518' —I3-112"X 2-7/8"XO,ID=2.38" 9628' H2-7/8"FES X NP,0=2.313" TOP OF 2-3/8"LNR H 9539' 9539' -}2-7/8"X 2-318"XO,D=1.92" • 9550' H4-12"OTIS X M?D=3.813" C B' 9666' H3-3/4"BKR DLOY SLV,ID=3.00" 4-1/2"TBG, ,L-801126, 9573' .0152 bpf,D==3.93.958" 9571' -{4-112"OTIS XN NIP,MILLED TO 3.80'(926!98) TOP OF 5-1/2"LNR H 958T w 9686' -13-12"FES X NP,D=2.813" BEHIND 3-112 LNR,9.3#,L-80,.0086 bpf,ID=2.972" --I 9587' 9686' H3-1/2"x 33116^x0,D=2.805' CT LNR 968T -19-518-X 5-1/2"TEBK SLV,D=? 9589' --14-12"11W SEAL ASSY,D=4.04" 9-5/8'CSG,47#,NT-80 NSCC,D=8.681" -I 9839' • 9600' H9-5/8'X 5-12"LNR HGR,D=7 5-1/2"LNR 17#,L-80 BUTT,.0232 bpf,D=4.89T - -9876 5-12'WHIPSTOCK(06/18/03) —{ —9876 - 5-12"LNR MLLOUT WINDOW(F-26B)9876'-9882' 3-3/16"LNR,6.2#,L-80 TCM,.0076 bpf,D=2.805" H 10040' 3-3/16"WHPSTOCK(05/23/13) -{ 10040' 3-3/16'LNR MLLOUT WINDOW(F-26C) 10040'-10046' PERFORATION SUMMARY REF LOG: MEM CTL ON 05/30/13 ANGLE AT TOP PERF: 90"@ 10870' a 10076' H TOP OF CBNHJT Note:Refer to Production DB for historical pert data " I SIZE SPF MYTff VAL Opn/Sgz SHOT SCiZ i 1.56" 6 10870-10900 0 05/20/15 ' - 1.56" 6 10985-11045 0 05/19/15 "4 1.56" 6 11100-11220 0 10/20/13 ,; I 1.56" 6 11375-11405 0 05/30/14 ' 1 1.56" 6 11800-11890 C 07/29/13 ' :it 11766'CTM -I2-3/8"BOT CBP(TAGGED 0520/15) 1.56" 6 11999-12199 C 05/31/13 ' •-; , 12163' —12-3/8"CBR MILS)&PUSFED[1-1(10/18/13) I 12200' H PBTD 2-3/8"LNR,4A',L-80 HYD 511, .0039 bpf,0=1.920" -I 12215' 'Vr..1 GATE REV BY COMMENTS DATE REV BY CONANTS PRUDHOE BAY UNIT 12/14/89\NORDIC 1 INTIAL COMPLETION 06/25113 N-IJMD CORRECTED LNR DEPTH WELL, F 26C 10/04/98 NORDIC 1 CTD SIDETRACK(F-26A) 08/27/13 CJF/PJC SET CBPADPERFS(7/28/13) PBRANT No:"2130450 06125103JNORDIC 1 C TD SIDETRACK(F-26B) 11/01/13 SRIYJMDTALL CFPIADPERF/CBP(10/18-20/13) API Na: 50-029-21987-03 06/01/13 NORDIC a CTD SIDETRACK(F-26C) 06/03/14 C RR/JMD ADFEFFS(05/30/14) SEC 2,T11N,R13E,2140 FSL&2197'FEL 06/04/13 GS/AAD DRLG HO CORRECTIONS 05/20/15 JC F/PJC TAG MR ADPERFS(05/19-20115) 06/13/13 TBDYJMD GLV CIO(06/07/13) BP Bcploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. pg J 3 - 0145 Well History File Identifier Organizing(done) ❑ Two-sided III IIIIIIIIIII liii ❑ Rescan Needed III 11111111111111 It7SCAN DIGITAL DATA OVERSIZED (Scannable) olor Items: ❑ Diskettes, No. ❑ Maps: Greyscale Items: ❑ Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: 31q,p4 /s/ 61 P Project Proofing I IIIII BY: 45 Date: /s/ u 0 Scanning Preparation ON. x 30 = &O + 7 = TOTAL PAGES Y� (Count does not include cover shee al BY: CM aria Date: 3/41 i /s/ r ►I Production Scanning III II1111IIIN 11111 Stage 1 Page Count from Scanned File: U (Count does include covers eet) Page Count Matches Number in Scanning Preparation: YES NO BY: Date:3/Li. I 14 /s/ 11,4 13 Stage 1 If NO in stage 1, page(s)discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III 1111111111111 III ReScanned III 111111111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked III 111111 III II1I III 12/22/2011 Well History File Cover Paqe.doc O M 9 I 11 I N m m w No ca 0 9 z zI z ZI m DI 0 5 N co J J J .N.. W_ W_ N Z i � 0 N 0 OJ WI LLI LLI o t6 I I I I F- J J u_ 0 I N l a LL d p 0 r m I l Ia I N cn cd ii CL b d LL ° 0 I 1 0 e M Q I— Cl- D 0 a d 00 1 0) 0)0 �co 1 o co I ? Z o0 H Z co cn1 c a (n1 Q LLI = co UI MI MI MI Q N •NU) 00- 0 l f6 0. _i M Q �� N N N co O .,,;d1 LL Q U a.0_dl LL I Q U LLI W LL N m N ill O co Z co d d m Z m d d m 0 N JI e0 ao 2 O C Y �Q :a W N Q W N O 0 �o Z_ LL N I LL N I LL N I U 0 0 c C ai ai 6 co ai yr ai co ai m Z ,- 'O N 0 JI N 0_II OI LL_II J IT JI01 LL JI C 0 LLI R LL D LL(2 LL w E oZ- oZU oZa c�Z0 oZ aC u0- C) I c) I C) Io d E 'cUU 'c0Z 'E0 'cUZ '20 0w 'E�= 'EW 'cam 'EW- W :° m 022D 22E E�0 22E og 40 oJm 202 o(0 201 J 0 2 l co 1 1 1 M I 1 m l c co� co� co cocoa co co coI a)co coI cow IR a)T- co co co 0 IX Q EO W N O W N J W N O W N J W N N 2 W N O W N 2 W N 2 W N J O Z ^ Q U C 'C _M co_ _M co_ _M M_ O. co_ _M CL ! Y > O O O O O O O O O W g m N N N N N N N N N RS til to Ln co oe co co co 00 co a0 0o co co o_ o W W J 22 U m Q U / o z a o rn LU Q ` ao+'O N O J I a OS N n 0) co. E Z 0 iM OI Z O O M CC r O N N 0 O(0 a) O N 0 N E a V U co c o J c o — U I Q Ce ZI m 1% J td o.. F- i Z l ". in )0 o cu J 5 z o 2 G if N J d W /0 o o m --I 0) O w 1 X Cr) 0 o 0 I (.6 cc c 1 Q d O �� ol o /z f E CI ID• ( 1 rn 0 u, E J U RS Z 7 co as co N as N N 07 co co m y m m m m m - m CO iu CO E " 0 0 0 0 aa) 0 0 0 0 co m m m m m o m m m m 0 0 0 0 0 0 J 0 0 0 0 to 0 Z a a � cn LC) Ln LO LU 0 E v v - v v v co co co co M Q Z 7F, C d A = M M M M M M M M M M N Q W o z N N N N N N N N N N 0 Q C m r LL € E LO , Z 2 o O 'cu- w 0 J ! ? W p 0 2 0 0 0 0 0 0 0 0 0 tU E Q w O a CY 0 I- 3 3 w 0 w w w J w 0 0 0 0 1 1 9 W II o f7 N 4 _II , Z/Z N 1 CO O Q CJ 1 V Z Z 0 >- >- >- no N LL —' v �, 0 I 0 N 0 0 CO -C co N• a) C v N Q F N a. O) Q .0 z LL >-, ur O Z M1 D > a) L L or F o, o O c 0 a m Q N m ) ) 2 I 0 ( O O M W N N U U _i I 2 O 1 J LL N 1O LL LL f j U O a) vi1 9 a) a) LL it w ? u �p a.(/) c Z /Z • m 2(91 v� 2 2 E > >- r a u� w 1m 0 0 Q lA 'i)U 1 i,.)Q c) 5 O N m LL1 a� a� U a Q c W N QJ N 2 W W N Q it O Z O co co ,F, Q d a) co d _ ' U O N N R N 7 Q Q W N Lc N N h O) W w - co rn II o ui a) a) a) n V 0. O >0 E Z vi :? ) o O N N J O O O 11-3 o f w II CL in c 2 U U M N I C e- o_ o G O O N a E A c I N CO N } } r E CD N 14C <0 N / co O I Q' I— LL F- co G CO M .2 E O co I 1 C N Q M w a) CO m a c o 1— E W 2 m d v+ =• f6 Cl) U a) C t6 O c o O O Q _ c- _ Q a o m .) 0 ID C C a Q E m U Z 1 E U c o 2 0 E co U Z I = a3 N f6 ! M M a) fa -O CC N M Q N Q Q C Q N N I O 1O 2 ;4 :6 O Z I'I CO N H o Q o o E O >- } Lo M c �,co co co co 1W E a ! O N N co N N a) W • O N ! a) p, w I d' 0 E E = N 1 > j E Z _ a U W N V Q Lo w C d N co H a O O c O Q O 0 < Q '—73 U C O U d U N o _ d J N o d lC 0.a E Q c j n O a) I o a) N Q y 0 Q Q Q y 0 O a) ' O a) 1 0 O a 2 W W W 3 ? U a 0 0 0 IY 0 i 0 c_ 'o C 0 r Lo '8 l+a 0 ice+ �1) tya CA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ♦ f "� r • 0 0 0 U 0 0 0 U U 0 U U U U U 0 0 U O O il L:J T N I W U I...1.a r 0 ra U U • zi r N ^ S W3 W 1 t• Z l (2 W Ova S 4) 0 > O /1 Q=Y 03 0 CO .-a 0- c"n lI _�n a,2 = O d o - a, c13 0 Crl W 0 ki) U ,; = N < 01 c* `V kl,, „„) 010.3m010,30101 M M M M M M M c N ci CI ° C4 - W >+ >+ C c T T c T �. >+ ' i+ N t9 1 0 R R C 3 7 03 t4 C 3 CO C CO T a O t4 a 0 V O 41 •C O x al CO .; 2 2 2 7 7 7 2 2 7 7 2 ' 2 Q 7 2 Q Z O z 'v s .- tO I '� n N co e- e- N N T N 0 0 M N r M x a C rd Cd c9 Crl cn Q O H z �� O O O. 0 O O W Lu O. I. LL LL LL LL LL Z LL LL Z LL LL 0 VI 0 0 0 0 LL 0 0 0 0 0 0 LU W re 0 cc i= ce e[ F- IY ce Q 0;, a a a a ce a V a a U a a w 0 a a a a a a Cl. s a s J 0 9- 9- 9- 9- 9- 9- LL w >- 9- w >• 9- >- - 0 0 0 0 0 0 0 cn Y 00 Y 00001- 1- J J 11 w w w a w w w X w w w w w w a, w U Q U U maw_ x 2 2 2 a 2 E 2 U J 2 2 J 2 E a 2 cn co 2 E _ '- I tit� 4 m o rt- ai N !"' O O W: v) Z cn0 O C LI% -D i i cu f- u' Z Z. N X X X X X X X X X X X X X X X X X X X X Q < cj 0 ii 0 t- 0 VD I GO fa go +c 1n 'I N ` N a- N O N CO 01 N M N lD 00 '� W o O p 0 0 Q1 00000000 Tr p O p 0 o a YO p O p O O O p O O O co O p O p p O O T a >" p O p 0 0 00 O O O O O O p 0 O, p 0 0 a C7 0^ O cc X Y N M Y _ N q . N ti N Y v Y LL LL o cr, a� .1 7 LL U LL LL 1n U LL J U J J 0 U N U- 0 LL .J J N co O m m 00000000000000000000 c O N O n top 'D N O . N T csi v� E 01 % v1 O c <-1 C Cl. Q um> my °> N o cO CO M CO co m Q N = N o 0) CU C C E w E 21 u < O e� N • N N M N O Oi N Q O r M N N 9-o fo miZ oo Z = ztit = In = � w0 = inatita -' No 'ntVU mom o 0. � = w r 9-n a- t 4. 3 v s „ c pi °' a °o c cn o h 3 (N Q X a m a Q • RECEIVED STATE OF ALASKA AL..,,KA OIL AND GAS CONSERVATION COMML ,SON NOV 12 2013 REPORT OF SUNDRY WELL OPERATIONS yA� 1.Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U" C)GCC Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Weil❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development 0 Exploratory ❑ 213-045-0 ' 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-21987-03-00• 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028280 ' PBU F-26C • 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL • 11.Present Well Condition Summary: Total Depth measured 12215 feet Plugs measured 11750 feet true vertical 9033.69 feet Junk measured 12153 feet Effective Depth measured 11750 feet Packer measured See Attachment feet true vertical 9034.6 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 30-110 30-110 0 0 Surface 2656 13-3/8"68#L-80 29-2685 29-2684.97 5020 2260 Intermediate None None None None None None Production 9811 9-5/8"47#NT-80 28-9839 28-8534.33 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11100-11160 feet 11160-11220 feet 11800-11890 feet 11999-12199 feet True Vertical depth 9040.93-9040.27 feet 9040.27-9040.86 feet 9033.26-9031.88 feet 9031.95-9033.29 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 27-9589 27-8336.08 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 1 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: I 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 334 27500 14 0 1063 Subsequent to operation: 2715 4493 172 0 182 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil U • Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUGO 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Gar .Catron • BP.Com I Printed Name Garry Catron Title PDC PE Signature Liz Phone 564-4424 Date 11/11/2013 Vi----- ./12 /// /%' -3 FIBD MS NOV 1 9-<- \''' Form 10-404 Revised 10/2012 _ L y Submit Original Only Packers and SSV's Attachment ADL0028280 SW Name Type MD TVD Depscription F-26C PACKER 9497 8197.31 4-1/2" HCM Packer F-26C PACKER 9511 8208.05 4-1/2" Baker KB LT Packer W R O O O O O N COCOCOO Cr LC) CO N f— V 0 CO O 0 0 0) N- CY • 0 co O m CO to co Ch r CY) 1� CO 0 tO O (Y) co O - Tr CO CO - M CO CO tM COO M CO CO CO CO N CO CO CO CO N CA LL) a co 01 M M N N M M CO CO CO CO f� O000) tOO) O CO oO co CO CO � in000cO000A L O) (3) CO N O) V S 0 a CO QN CO 0CCO OCOOCO000O) I. c (V M0) � � N N N C CD � J • 9 CO CD co co co = dcb� Nz .y N x CO CO• CO N CO to - (A _ _ - U N 00 M (V c7 M CU N CO CCOO t d N O N O) J z O 0 w vzwwwOrxm O zzzcmD U � � � CI_ COI- A TREE= 4-1/16"CM/ WBLF€AD= MoEVOY F_2 6 C SA._.r NOTES:WELL ANGLE>70°@ 10482" ACTUATOR= BAKER IYTAL KB.B.EV= 67.71' BF.ELEV= 38.61 / KOP= 3091' 2112' H4-1/2"OTIS SSSV NI?D=3.813° Max Angle= 94°@ 11493' GAS LFT MANDRELS Datum MD= 10248' ST MD TVT) DEV TYPE V LV LATCH FORT DATE Datum TVD=.._ 8800'SS 5 3092 3091 10 CAMCO DOME R( 16 06/07/13 4 5861 5387 39 CAMGO SO Rlt 20 06/07/13 20°CONDUCTOR ? 3 8149 7199 35 MACXX) DM' RK 0 12/14/89 13-3/8'CSG,68#,L-80 BUTT,D=12.415" —1 2685' 2 9304 8117 39 MAOCO DM/ RK 0 12/14/89 1 9445 8225 40 MACCO DMY BK 0 12/14/89 9473' J-ja-1 Minimum ID =1.92" @ 1-14-1/2"onsx ,D=3.$13• MP,9639' 2-7/8" X 2-3/8" LINER XO PIN 9480' H4-112"OTIS SBR OVERSHOT r. "M: Fay 9497' H9-518"X 4-1/2"OTIS PKR,0=3.85" .I 4-112'BKR 45 KB LIP,D=2.37"(06/06/13) H 9511' 0 0: 9512' 1-13.70"DEPLOY SLEEVE,D=3.00" 1 9518' --{3-112"X 2-7/8"XO,D=2.38" ,. 9528' ,--12-7/8'FES X NP,D=2.313' TOP OF 2-3/8"LNR H 9539' • 9539' 2-7/$"X 2-3/8"XO,D=1.92° 1 , I� 1 9550' —14-1/2"OTIS X NP,D=3.813• I 4-112"TBG,12.6#,L 80 TDS, —{ 9573' !Nil� 9�' H3-3/4'BKR DEPLOY SLV,D=3.00" I .0152 bpf,D=3.958" 9571' —I4-112'OTIS XN NP,MLLED IO 3.80"(9/26/98) TOP OF 5-1/2"LNR 9587' ` 9585' H3-1/2"FES X NP,I)=2.813" —I � ,.� � BEHIND I3-1/2"LNR,9.3#,L-80,.0086 bpf,D=2.972" H 9587' '� �3 1f2"X 33f16"XO,D=2_$05" CT LNR 9587' —I9-5/8"X 5-1/2"T133K SLV,D=? I 9589" —14-1/2'TM/SEAL ASSY,D=4.04" 9-5/8'CSG,47#,NT-80 NSCC,D=8.681" H 9839' I— 9600' —I9-5/8"X 5-1/2"LM2 HGR,D=? I 5-112'LNR,17#,L-80 BUTT,.0232 bpf,D=4.892' —9876 5-1/2"WHIPSTOCK(06/18/03) —9876 5-1/2'LNR MLLOUT WNDOW(F-266)9876'-9882' 3-3/16"LNR,6.2#,L-80 TCI,.0076 bpf,0=2.805" — 10040' 3-3/16'LNR FLOUT WINDOW(F-26C) 10040'-10046' 3-3/16"WHPSTOCK(05/23/13) --J 10040' I PERFORATION SUMMARY REF LOG: MBut CM ON 05130/13 i 9 10076' 1—ITOP OF CEMENT I ANGLE AT TOP PER E: 91°Q 11100' S 9 Note:Refer to Production DB for historical perf data I 11750' 1-12-3/8"BOT CEP{10/19113} SIZE SPF MQTERVAL Opn/Sqz SHOT SC)? ; ' 1.56' 6 -11100-11220 0 10/20/13 1 ; 1.56" 6 11800-11890 C 07/29/13 a I I 12163' 1-12-3/8"CBP PUSHED OH AFTER MLL(10/18/13) I 1.56" 6 11999-12199 C 05/31/13 0 ii 11: 1 12200' I--I FBTD IP 2-318"LNR,4.4",L-80 HYD 511, .0039 bpf,D=1.920' H 12215' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOEBAY UNIT 12/14/89 NORDFC 1 INTIAL COMPLETION 06/25/13 Mr/JMD CORRECTS)MR DEPTH WELL: F-26C 10/04/98 NORDIC 1 CID SIDETRACK(F 26A) 08/27/13 CJF/PJC SET CBF'/ADPERFS(7/28113) PH7MT No:"2130450 06/25/03 DAC/KK CTD SIDETRACK(F-2613) 11/01/13 SFiCI D PALLID CEP/ADPERF/SET CBP(10/1i API No: 50-029-21987-03 06/01/13 NORDIC 2 CTD SIDETRACK(F 26C) SEC 2,T11 N,R13E,2140'FSL&2197'FB.. 06/04/13 GS/MVO ORLG HO CORRECTIONS 06/13/13 TBDIJM) GLV CFO(06/07/13) BP Exploration(Alaska) RECEIVED STATE OF ALASKA ALr,oKA OIL AND GAS CONSERVATION COMMI;,...,ON AUG 2 8 2013 REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development el Exploratory ❑ 213-045-0 • 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-21987-03-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028280 - PBU F-26C 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,PRUDHOE OIL . 11.Present Well Condition Summary: Total Depth measured 12215 feet ' Plugs measured 11950 feet true vertical 9033.69 feet Junk measured None feet Effective Depth measured 11950 feet Packer measured See Attachment feet true vertical 9031.82 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 30-110 30-110 0 0 Surface 2656 13-3/8"68#L-80 29-2685 29-2684.97 5020 2260 Intermediate None None None None None None Production 9811 9-5/8"47#NT-80 28-9839 28-8534.33 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11800-11890 feet 11999-12199 feet True Vertical depth 9033.26-9031.88 feet 9031.95-9033.29 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 27-9589 27-8336.08 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 331 25466 27 0 958 Subsequent to operation: 482 27675 28 0 930 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 , Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil U, Gas U WDSPIU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCCI 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerha s• BP.com Printed Name Nita Summerhay- Title Petrotechnical Data Technician 1,1,. �9la�� . - niro/J,► o ��`; Phone 564-4035 Date 8/28/2013 I7j_./` RBDMS SEP - 5 20 i 4/ic/i3 Form 10-404 Revised 10/2012 ,Ole Submit Original Only Daily Report of Well Operations ADL0028280 CTU#3=-1.5"Coil Job Objective: CIBP and Add-Perf MIRU CTU. 7/26/2013 ...Continued on WSR 7-27-13... CTU #3 - 1.5" Coil **"Continued from WSR 7-26-13*** Job Objective: CIBP and Add Perf Finish Rig Up CTU. Make up Drift/FCO BHA with 1.5" JSN. Fluid pack wellbore and RIH. Tagged the PBTD @ 12190' CTM, POOH. L/D the drift BHA, cot the cold roll CTC and made WFD internal dimple connector. P/U WFD MHA, PDS GR/CCL tools and 1.75" DJN. RIH to 12000 ft, Logged up to 9300' & painted a white/orange flag @ 11900.2'. POOH. Good log data, Make up 2 3/8" CIBP and RIH. Tie in at flag and set CIBP with mid element at 11950.0', top of plug 11949.7'. PT plug to 2500 psi WHP and determine loss of-0.04 bpm, POOH and prepare for perf gun runs. 7/27/2013 ...Continued on WSR 7-28-13 CTU #3 - 1.5" Coil ***Continued from WSR 7-27-13*** Job Objective: CIBP and Add Perf POOH. Make up 30' of 1.56 HSD guns and RIH. Correct to flag and then tie in to CIBP. Perforate 11860-11890'. POOH Make up 30' of 1.56 HSD guns and RIH. Correct to flag and then tie in to CIBP. Perforate 11830-11860'. POOH. Swap the BOP's and Perform BOP test. Make up last 30' of 1.56" HSD guns and RIH. 7/28/2013 ...Continued on WSR 7-29-13... CTU #3 - 1.5" Coil ***Continued from WSR 7-28-13*** Job Objective: CIBP and Add Perf RIH with 30' of 1.56" HSD perf guns. Correct depth at flag and tie in to CIBP. Perforate 11800-11830'. POOH and pump meth freeze protect. RDMO CTU. 7/29/2013 ***Job Complete*** FLUIDS PUMPED BBLS 441 1% KCL 25.50/50 METH 466 TOTAL w In• c0000 _ O N f- N to O 0 ,7 Nr∎ (.) 4g (O O 0000 I• N Cr) 00 O ct m '- r- CO to CO M M I. co to O M O ,- 4Clo444CO cn co co co co ce, Cr) CDLOOtOCOM CO CO CIO CO N CO CO co M N LO to 0oD CoOI- M Cr) CC) N N N Cr) Cr) CO CO CO CO O F- 0 CD O tO CO O P..- M co co' to Co Co CO to = O O O N O C) COO ° Bit II CO 2 N W occooWWWMr- 8) N Mtointo N N N C Q 12 0 Q o co a co O co cr) N co *k Z co M O r, 4 V N M N M M 0"- • t co O '- CO N C000Nin C° 000O O d Nr N O N O Z O O ED C7 m O a Q O O LL Z OZ W W W O c OZZZWDD Packers and SSV's Attachment ADL0028280 SW Name Type MD TVD Depscription F-26C PACKER 9497 8197.31 4-1/2" HCM Packer F-26C PACKER 9511 8208.05 4-1/2" Baker KB LT Packer "EE_ 4-1/16'CM/ F 26C VU�IJfAD= McEVOY � SAF_.l NOTES:WELL ANGLE>70°@ 10482" ACTUATOR= BAKER I - - - MIAL KB.H_EV= 67.71' 1: BF.ELEV= 38.61 2112' I-l4-1/2"OTIS SSSV NP,D=3.813" KOP= 3091' • Max Angle= 94°@ 11493' GAS LIFT MANDRELS Datum MD= 10248' ST PA) WD DEV TYPE VLV LATCH PORT DATE Datum WD= 8800'SS 5 3092 3091 10 CAMCO DONE RK 16 06/07/13 20"CONDUCTOR ? 4 3 5861 8149 5387 7199 35 39 NICAMCO ACOO DMY SO RK RK 20 0 06/07/13 12/14/89 13-3/8"CSG,68#,L-80 BUTT,D=12.415" —1 2685' 2 9304 8117 39 MACCO DMY RK 0 12/14/89 1 9445 8225 40 MACCO DMY RC 0 12/14/89 Minimum ID = 1.92" @ 9639' I 9473' H-14-1/2"OTIS X NP,D=3.813" I 2-7/8" X 2-3/8" LINER XO PIN _i 94$0 I—Ia-1/2"OTIS SBROVERSHOT 9497' I-19-518'X 4-1n'OTC PKR D=3.85" 4-1/2"BKR45 KB LIP,D=2.37"(06/06/13) — 9511' I W ■■ 9512' 03.70"DEPLOY SLEEVE,D=3.00" • - 9518' —13-1/2-X 2-7/8"X0,D=2.38' 9528' --I2-7/8"I-ES X NP,D=2.313" I TOP OF 2-3/8•LNR H 9539' I --I 9539' H2-7/8'X 2-3/8"XO,D=1.92" ,'''s......---''''I 9550' H4-1/2"OTIS X NP,D=3.813" I 9566' —I3-3/4"BKR DEPLOY SLV,D=3.00" I 4-1/2"TBG,12.6#,L-80 IDS, H 9573' .0152 bpf,ID=3.958" 9571' H4-1/2"OTIS XN NP,PALLED TO 3.80•(9/26/98) TOP OF 5-1IT LM —I 9587' _-- 9585' IH3-1/2•HES S X NP,D=2.813" BEHIND 3-1/2"LNR,9.3#,L-80,.0086 bpf,D=2.972" — 958T 9586' I—I3-1/2•X3-3/16"XO,D=2.805• CT LNR 958T H9-5/8"X 5-1/2"TEBK SLV,13=? 9589' H4-1/T TIW SEAL ASSY,D=4.04" 9-5/8"CSG,47#,NT-80 NSCC,D=8.681" --I 9839' I ■ 9600' H9-5/8"X 5-1/2"LNR HGR,D=? I 5-1/2"LNR,17#,L-80 BUTT,.0232 bpf,D=4.892" —I —9876 5-1/7'WI-FSTOCK(06/18/03) —I —9876 I- 1 5-1/2'LNR MLLOUT WINDOW(F-26B)9876'-9882' 3-3/16"LNR,6.2#,L-80 TCII,.0076 bpf,D=2.805• —1 10040' I 3-3/16"LNR MLLOUT WNDOW(F-26C) 10040'-10046' 3-3/16"W-PSTOCK(05/23/13) H 10040' i PBZFORATION SUMARY REF LOG: WM CNL ON 05/30/13 r 10076' —I TOP OF CEPA341T I ANGLE AT TOP PERE: 89°@ 11999' a 9 Note:Refer to Production DB for historical pert data j SIZE SPF NTERVAL Opn/Sqz SHOT SOZ 1 ' 1.56". 6 11999-12199 0 '05/31/13 i-" 11950' I--I2-3/8"CEP(07/28/13) I 1.56" 6 11800-11890 0 07/29/13 r IIC S;yV�,/ 12200' I—{ PBTD 2-3/8"LNR,4.4",L-80 HYD 511, .0039 bpf,D=1.920" H 12215' r"`y DATE REV BY COM.B'lfS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/14/89 NORDIC 1 INTIAL COMPLETION 06/25/13 NWJM) CORRECTED LNR DEPTH WELL F-26C 10/04/98 NORDIC 1 CTD SIDETRACK(F-26A) 08/27/13 CJF/PJC SET CBPIADPERFS(7/28/13) FBRMT No:"2130450 06/25/03 DAC/KK CTD SIDETRACK(F-2613) AR No: 50-029-21987-03 06/01/13 NORDIC 2 CTD SIDETRACK(F-26C) SEC 2,T11 N,R13E,2140'FSL&2197'FEL 06/04/13 GS/JND DRLG HO CORRECTIONS 06/13/13_TBD+JM) GLV C/O(06/07/13) BP Exploration(Alaska) -TA LOGGED ,/7/2013 i t-_-i., t ..t K BENDER . BAKER PRINT DISTRIBUTION LISI'G o 5 ?Oh COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) 2∎3-^4t 5 WELL NAME 20 WELLS RUN NUMBER (mandatory) `c:,5 FIELD Prudhoe Bay BH SALESMAN Jesse Salyer (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 7/30/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. 1 (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY CD FIELD FINAL (digital/ ADDRESS(FEDEXWILL NOT DELIVER TO P.O.804 LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #01-I'KIN I S #OF COPIES #OF COPIES 1 BP Exploration(Alaska)Inc. I I 3 I 1 I I I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I I I 1 !r I Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 ExxonMohil,Alaska I I 1 I 1 I I I Attn Lvnda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I I 1 I 1 I I I Christine Shart rer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I I I 1 I I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage.Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: #REF! #REF! #REF! #REFI #REF! #REF! in -t.�, 0 n t t!, I o,... Lo o .. ..) 000000000 •1 P P P P P P P P P U Ili LIJ 1-4 (t' ~ (� W i O .r o Jli m i r cr U fd _ CU IIZ Li 1I �'Z o V © ' a Z Z Z n - ( U o n Et O = N -a v 14 -2 h0• • ro a"a 0 V N, of m co LT, M M M M M M M M M Y N Qj r--1 CS r P P P P P P P P■ O r" l7 fQ to CO �. a as d c to c trg.....9:1 SLi Cff 2 2 2 2 Q Q 2 Q 7 N N,Ht 3 ,x Q CO N o lb to N ,_ r J co M t10 rd N P P C4 cJ X a c7 R 1 X eJ LL < W J O S J a m W U U -3 J p 0 0 0 I- zzz2rl- r I U U 0 W 2 2 2 2 m W W W 1 III Cw" i5 O III CV RD tD t1� i;1- Q = 0 Q x x x N 0 = ' giJ Q t./) vS X X X X X X F a Q 0 ce In Q 4 1 AZ tt; in o t~D 0 in 0 t j co � CO o 0 0 o 0 0 0 P 0 W0000, 00000 o0 0 0 9 ° 0 00 00 0 : 0 0 ID ca O LL X U X PSI LL c Q o o Q 0 >- m -7 Q X N -o ... § I m ° 0000000300 f� c .; = v c, -- P \ i A. m ,I a i 2 0 et to ams> m ° w i ai,fC E E t. L.4 Q X P N o M X' 0 f� 0 c..."-- U cu 0 y G to d ff i'9 %A Q .^t1'n ^. X d m RECEIVED �3 _O 5 JUL 2 3 2013 Letter of Transmittal AOGCC BAKER Date: July 19, 2013 HUGHES Lt To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): E-01 B D-31 BPB 1, D-31 B E-16APB1, E-16A F-01B E-25APB 1, E-25A (resubmission to correct API number on E-25APB 1 only, E-25A is unchanged) G-12C F-26C B-05DPB1, B-05D Y-33APB1, Y-33A Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. IP RECEIVED BY A Ia Iiiiil , State of Alaska AOGCC DATE: i -- ------ ----- • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,f la. Well Status: . ®Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended lb. Well Class 20AAC 25.105 2OAAC 25.110 ❑Exploratory ❑Stratigraphic ❑GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One • ®Development ❑Service 2. Operator Name: 5. Date Comp.,Susp.,or Aband.: tu4 12. Permit to Drill Number: BP Exploration(Alaska) Inc.• ' -6)442943- CJ/31/13 213-045 . 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 . 5/23/2013 50-029-21987-03-00 • 4a. Location of Well(Governmental Section): 7. Date T.D.Reached: 14. Well Name and Number: Surface: 5/27/2013 PBU F-26C. 2140' FSL,2197' FEL, Sec.02,T11N, R13E, UM 8. KB(ft above MSL): 67.71' 15.Field/Pool(s) Top of Productive Horizon: 1988' FNL,2688' FEL, Sec. 11,T11N, R13E, UM • GL(ft above MSL): 36.46' Prudhoe Bay/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD) 2736' FNL,4174' FEL, Sec. 11,T11N, R13E, UM 12200' 9033' • 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 652650 y- 5973674 Zone- ASP4 12215' 9034' • _ ADL 028280 • TPI: x- 652247 y- 5969537 Zone- ASP4 • 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 650778 y- 5968758 Zone- ASP4 None 18. Directional Survey: ®Yes ❑No • 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/MCNL 10040' 8688' • 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE To BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor Surface_ 110' Surface 110' _ 13-3/8" 68# L-80 Surface 2685' Surface 2685 17-1/2" 4198 cu ft Arcticset II&III 9-5/8" 47# NT-80 Surface 9839' Surface 8534' 12-1/4 2075 cu ft Class'G' 5-1/2" 17# L-80 9587' 9876' 8335' 8564' 8-1/2" 498 cu ft Class'G' 3-1/2"x 3-3/16" 9.3#/6.2# L-80 9566' 10040' 8318' 8688' 3-3/4" 140 cu ft Class'G' 2-3/8" 4.4# L-80 9511' 12215' 8276' _ 9034' 3-1/4"x 3" 44 sx Class'G' 24. Open to production or injection? ®Yes ❑ No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ( ) _ ( ) 1.56"Gun Diameter,6 spf 4-1/2", 12.6#, L80 9589' 9497'/8265' F 1 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11999'-12199' 9032'-9033' 1..:iWlas WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No 1 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED . 2500' Freeze Protect w/45 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc June 10,2013 Flowing Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 6/18/2013 6 Test Period of 97 6066 6 95 62925 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 1200 1180 24-Hour Rate ♦ 386 24265 22 25.9 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ®No Sidewall Core(s)Acquired? ❑Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071 None RBDMS JUN 26 201 Form 10-407 Revised 10/2012 1 J r/ / /3 CONTINUED ON REVERSE �c���jl� Submit Original Only V /`lo` i .. G 29. GEOLOGIC MARKERS(List all formations an. ,cers encounter 30. FORMATION TESTS NAME MD TVD Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. CGL/Zone 3 10164' 8792' None Base of CGL/Zone 2C 10250' 8869' 23SB/Zone 2B 10308' 8918' 22TS 10391' 8977' Formation at Total Depth: Zone 2B 10308' 8918' 31.List of Attachment Summary of Daily Drilling Reports,Summary of Post-Rig Work,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Brad Gorham;564-4649 Email: Bradley.Gorham @bp.com Printed Name: Joe Lastu Title: Drilling Technologist Signature: 1 Phone 564-4091 Date: V!/2-5/13 v � INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only WELL 4-1116"CIW F_2 6 C WELLHEAD= McEVOY Kw[`�,', SAFL _OTES:WELL ANGLE>70°@ 10482" ACTUATOR= BAKER I INTIAL KB ELEV= .-. 67.71' BF.ELEV= 38.61 3091' 2112' 1-14-1/2"OTIS SSSV NIP,D=3.813" I KOP= Max Angle= 94°@ 11493' 0 GAS LIFT MANDRELS Datum MD= 10248' , ST MD (VI) DEV TYFE VLV LATCH FORT DATE Datum TV D= 8800'SS 5 3092 3091 10 CAMCO DOME RK 16 06/07/13 4 5861 5387 39 CAMCO SO RK 20 06/07/13 20"'CONDUCTOR ? 3 8149 7199 35 MACCO DMY RK 0 12/14/89 13-3/8"CSG,68#,L-80 BUTT,D=12.415" IH 2685' 2 9304 8117 39 MACCO DMY RK 0 12/14/89 1 9445 8225 40 MACCO DIN RK 0 12/14/89 Minimum ID = 1.92" @ 9539' 9473' 44-112"011Sx NP,ID=3.813^ 2-7/8" X 2-3/8" LINER XO PIN 9480' H4-1/2"OTIS SBR OVERSHOT =, •M 9497' H9-5/8^X 4-1/2"OTIS FKR,D=3.85" 4-1/2"BKR 45 KB LTP,ID=2.37"(06/06/13) — 9511' 0 o 9512' —13.70'DEPLOY SLEEVE,ID=3.00" 1 9518' —13-112"X 2-7/8"X0,D=2.38" ' 9528' —I2-7/8-HES X NIP,D=2.313" I TOP OF 2-3/8"LNR H 9539' 1 9539' —{2-7/8"X 2-3/8^XO,D=1.92^ 9550' H4-112"OTIS X NP,D=3.813" 4-112"TBG,12.6#,L-$0 TDS, —{ 9573' 9566' —I3-3/4"BKR DEPLOY SLV,D=3.00" .0152 bpf,ID=3.958" 9571' —I4-112-OTIS XN NIP,MLLED TO 3.80"(9126198) TOP OF 5-112"LNR — 9587' 9585' .-13-1/2"HES X NIP,ID=2.813" BEHIND H `4 9586' --I3-1/2"X 3-3/16"X0,D=2.805" CT LNR 3-112"LNR,9.3#,L-80,.0086 bpf,D=2.972" -I 9587' 958r —I9-5/8^X 5-1/2'TEBK SLV,0=? 9589' 1-14-1/2"11W SEA LASSY,D=4.04" 9-5/8"CSG,47#,NT-80 NSCC,ID=8.681" H 9839' ■ 9600' —I9-5/8"X 5-112"LNR HGR,ID=? 5-1/2"LNR,17#,L-80 BUTT,.0232 bpf,ID=4.892" — ^-9876 5-1/2"WHIPSTOCK(06/18/03) —I —9876 5-1/2"LNR MILLOUT WINDOW(F-26B)9876'-9882' 3-3/16"LNR 6.2#,L-80 TCII,.0076 bpf,ID=2.805" —I 10040' 3-3/16"LNR MILLOUT WINDOW(F-26C) 10040'- 10046' 3-3/16"WHESTOCK(05/23/13) —I 10040' PERFORATION SUMMARY REF LOG: MEM CNL ON 05/30/13 - 10076' —ITOP OF CEMBVT ANGLE AT TOP FERF: 89°@ 11999' Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ ` 1.56" 6 11999-12199 0 05/31/13 A a @ P 9 12200' --I FBTD 2-3/8"LNR,4.4",L-80 HY D 511, .0039 bpf,D=1.920" H 12215' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/14/89 NORDIC 1 INTIAL COMPLETION 06/25/13 NWJkC) CORRECTED LNR DEPTH WELL: F-26C 10104/98 NORDIC 1 CTD SIDETRACK(F-26A) PERMIT No:42130450 06/25/03 DACIKK CTD SIDETRACK(F-26B) API No: 50-029-21987-03 06/01/13 NORDIC 2 CTD SIDETRACK(F-26C) SEC 2,T11 N,R13E,2140'FSL&2197'FEL. 06104/13 GS/JMD DRLG HO CORRECTIONS 06/13/13 TBD/JMD GLV GO(06/07/13) BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 10 Operation Summary Report Common Well Name:F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/19/2013 End Date:5/28/2013 X3-013G0-C:(2,778,205.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/19/2013 19:00 - 00:00 5.00 MOB P PRE RIG DOWN OUTSIDE EQUIPMENT AND BACK OFF WELL. LOAD RIG MATS AND CLREAN WELLHEAD. CLOSE OUT WELL WORK TRANSFER PERMIT. 5/20/2013 00:00 - 02:00 2.00 MOB P PRE MOVE FROM G-PAD TO F-PAD 02:00 - 06:00 4.00 MOB P PRE STAGE ON F-PAD AND PLACE RIG MATS. MOVE SAT CAMP. BLEED OA FROM 180-PSI TO 100-PSI (10BBLS). WAIT ON CHANGE OUT OF DHD TECH TO FINISH BLEEDING DOWN OA. 06:00 - 06:30 0.50 MOB P PRE CREW CHANGE. DISCUSS RIG MOVE AND CURRENT RIG AND WELL STATUS. CONTINUE INTERNAL PROJECTS WHILE CONTINUING TO PREP AREA AROUND WELL HEAD. 06:30 - 08:30 2.00 MOB P PRE WAIT ON DHD HAND AND BLEED TRAILER/ VAC TRUCK. DISCUSS OA PRESSURE WITH WELLS COORDINATOR. OA HAS BEEN DOUBLE VALVED. WORK ON MUD PUMP#2. MAKE WELDING REPAIRS IN PIT NUMBER 1. 08:30 - 10:00 1.50 MOB P PRE ATTEMPT TO BLEED OA AGAIN WITH DHD HAND. UNABLE TO REDUCE PRESSURE BELOW 170 PSI. OBTAIN APPROVAL FROM WTL TO MOVE OVER WELL AS OA IS DOUBLE VALVED. CHECK IA. BLEED FROM 30 PSI TO 0 PSI. SECURE TREE AND ANNULAR VALVES. 10:00 - 12:00 2.00 MOB P PRE MOVE RIG DOWN PAD. MANOUVER RIG TO MISS LIGHT POLE AND SPOT OVER RIG. SET RIG DOWN. ACCEPT RIG AT 1200 HRS. 12:00 - 14:00 2.00 BOPSUR P PRE CYCLE TREEE VALVES TO BLEED ANY TRAPPED RESSURE. RU TO SSV CONTROL PANEL. LEAK TIGHT TEST SV AND MV PRIOR TO ND TREE CAP. 14:00 - 17:30 3.50 BOPSUR P PRE ND TREE CAP. NU BOPS. SPOT FLOW BACK TANK. MU AND TEST HARDLINE. CONTINUE TO SPOT AND RU OTHER EQUIPMENT. Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 2 of 10 Operation Summary Report Common Well Name F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/19/2013 End Date:5/28/2013 X3-013G0-C:(2,778,205.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING©67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 23:00 5.50 BOPSUR P PRE SHELL TEST STACK TO 4500 PSI. TEST BOPE TO 250/3500 PSI FOR 5 CHARTED MIN TEST CHOKE VALVES,CHOKE AND KILL HCR, INSIDE MANUAL VALVES ON CHOKE AND KILL LINE,BOP RAMS AND ANNULAR PREVENTER. TEST 2 FULL OPENING SAFETY VALVES FUNCTION BOPE FROM BOTH REMOTE PANELS TESTIS WITNESSED BY TOOLPUSHER AND WSL. AOGCC INSPECTOR JOHN CRISP WAIVED TEST WITNESS. NO FAILURES -SEE ATTACHED CHARTS AND TEST REPORT 23:00 - 00:00 1.00 BOPSUR P PRE PJSM FOR SLACK MANAGEMENT.PUMP SLACK BACK INTO REEL. • 5/21/2013 00:00 - 02:30 2.50 BOPSUR P PRE PERFORM COIL MANAGEMENT,CUT 250' COIL. PUMP E-LINE FORWARD. 02:30 - 06:00 3.50 BOPSUR N RREP PRE TROUBLESHOOT ELECTRICAL SYSTEM IN SCR HOUSE. UNABLE TO MOVE DRAWWORKS/#2 LINER WASHER NOT WORKING. CIRCULATE ACROSS TOP OF SHUT IN WELL WHILE ELECTRICIAN TROUBLESHOOTS RIG SYSTEMS. 06:00 - 06:30 0.50 BOPSUR N RREP PRE CREW CHANGE. DISCUSS CURRENT OPERATIONS. MAKE EQUIPMENT CHECKS AND ROUNDS. CONTINUE TO TROUBLE SHOOT SCR/DRAW WORKS ISSUE. DRAW WORKS REPAIRED. 06:30 - 09:45 3.25 MOB P PRE PRESSURE TEST INNER REEL VALVE AND PACKOFFS.TO 250 AND 3600 PSI. CHART SAME. PASSED. CONTINUE E-LINE SLACK MANAGEMENT. INSTALL KENDAL CONNECTOR. LEAKED. RE-INSTALL KENDAL CONNECTOR. PULL AND PRESS TEST. GOOD. 09:45 - 10:30 0.75 BOPSUR P PRE PRESS TEST INTEQ DFCV. 250 AND 3600 PSI. PASSED. 10:30 - 12:00 1.50 BOPSUR P PRE PRJS WITH VALVE SHOP CREW. MEASURE TO THAAND MW/SV. MU TOOLS. BRING LUBRICATOR TO RIG FLOOR. INSTALL AND PRESSURE TEST LUBRICATOR TO 250/3500 PSI. 12:00 - 13:00 1.00 BOPSUR P PRE PULL TWC,WELL ON VAC. SI WELL AT MASTER AND SWAB. RIG DOWN LUBRICATOR. 13:00 - 15:30 2.50 BOPSUR P PRE WAIT ON WSL CHANGEOUT. 15:30 - 17:00 1.50 BOPSUR P PRE OPEN UP AND FILL WELL,TAKES 18 BBLS TO FILL. SWAP REEL TO MUD. REPAIR LEAKING SEAL ON PUMP 2 DISCHARGE. 17:00 - 18:00 1.00 BOPSUR N RREP PRE WAIT ON PUMP DISCHARGE SEAL TO SET. Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 3 of 10 Operation Summary Report Common Well Name:F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/19/2013 End Date:5/28/2013 X3-013G0-C:(2,778,205.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Let:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 19:00 1.00 BOPSUR P PRE PUMP 5 BBL METH SPEAR DOWN KILL FOLLOWED BY BULLHEAD OF 250 BBLS KCL. UNABLE TO ACHEIVE BULLHEAD RATE WITH 25 BBLS AWAY-2.6 BPM AT 3400 PSI. CALL ODE FOR REVISED PLAN. 19:00 - 23:30 4.50 BOPSUR P PRE DISCUSS OPTIONS WITH WTL FOR WELL KILL OPERATIONS WITH A NOZZLE RUN. APPROVAL GIVEN TO MOVE FORWARD AND KILL WELL WITH NOZZLE ASSEBLY. MU NOZZLE,RIH F/14'-10,600'MD. CIRCULATE KWM-8.8 PPG MM IN/OUT- 2.54/2.52 INITIAL/FINAL CIRC PSI-3303/3750,PVT-319 MW IN/OUT-8.87/8.80.CIRCULATED TOTAL OF 151 BBLS BEFORE SHUTTING DOWN FOR FLOW CHECK. 23:30 - 00:00 0.50 BOPSUR P PRE FLOW CHECK WELL AFTER WELL KILL OPERATIONS. 5/22/2013 00:00 - 02:30 2.50 KILLW P WEXIT FLOW CHECK COMPLETE,WELL ON SLIGHT LOSSES.WELL TOOK 2 BBLS IN 30 MINS.POOH F/10,600'-9500'MD ©30 FPM.POOH F/ 9500'-14'MD @ 100 FPM.FLOW CHECK-NO FLOW. 02:30 - 03:00 0.50 KILLW P WEXIT STAND INJECTOR BACK,LD BHA#1. HELD H2S/EVAC DRILL WITH RIG CREW. CONDUCT AAR WITH CREW. 03:00 - 04:00 1.00 STWHIP P WEXIT MU BHA#2 WHIPSTOCK ASSEMBLY. SET INJECTOR ONTO WELL,PRESSURE TEST QTS 250 LOW/3500 PSI HIGH-PASSED. VERIFY MWD INPUTS BEFORE RIH WITH WHIPSTOCK. 04:00 - 06:00 2.00 STWHIP P WEXIT RIH WITH WHIPSTOCK F/68'-8050'MD. 06:00 - 07:00 1.00 STWHIP P WEXIT CONTINUE TO RIH TO LOGGING DEPTH. LOG FROM 9870'-9930'AT 2.4 FPM. (-20)'CORRECTION BASED ON TOP OF SHUBLIK. 07:00 - 07:30 0.50 STWHIP P WEXIT PUWAT 10,000'30K. CLOSE EDC. POSITION TOP OF WHIPSTOCK AT 10,040', 140 DEG ROHS.PRESSURE UP TO 4000 PSI FOR SHEAR.SET 4K DHWOB TO CONFIRM SET.PUW 28.5K. 07:30 - 09:30 2.00 STWHIP P WEXIT POH FROM 10,040' LOG CCLAT 1000 FPH FROM 9720-9490'FOR 2-3/8"LINER TOP SETTING INTERVAL POH TO SURFACE. 09:30 - 10:30 1.00 STWHIP P WEXIT FLOW CHECK AT SURFACE,5 MIN NO FLOW. STAND BACK INJECTOR. LAY DOWN WHIPSTOCK SETTING BHA. 10:30 - 11:00 0.50 STWHIP P WEXIT MEET WITH HIGH LEVEL VISITORS TO REVIEW CONTROL OF WORK. Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 4 of 10 Operation Summary Report Common Well Name:F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/19/2013 End Date:5/28/2013 'X3-013G0-C:(2,778,205.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:15 1.25 STWHIP P WEXIT FILL WELL,PRESSURE TEST TUBING,LINER AND WHIPSTOCK PACHER TO 250 PSI LOW FOR 5 MIN,2000 PSI HIGH FOR 30 MIN WITH 4.3 BBLS. PRESSURE DROP FROM 2000 TO 1850 IN 5 MIN,PRESSURE UP TO 2000 PSI 11:26 START TEST AT 2000 PSI 11:31 5 MIN 1930 PSI 11:39 13 MIN 1908 PSI 11:41 15 MIN 1897 11:49 23 MIN 1890 11:56 30 MIN 1886 103 PSI LOST IN 1ST 15 MIN,11 PSI LOST IN 2ND 15 MIN FORA TOTAL OF 114 PSI LOST= 6% 12:15 - 12:45 0.50 STWHIP P WEXIT PJSM FOR BHA MU BHA#3,WINDOW MILLING GUAGE MILL AND STRING MILL—2.74" GO/2.73"NO-GO. 12:45 - 13:00 0.25 STWHIP P WEXIT GET ON WELL,PRESSURE TEST QTS TO 250/3500 PSI. 13:00 - 14:45 1.75 STWHIP P WEXIT RIH WITH BHA#3. 14:45 - 15:15 0.50 STWHIP P WEXIT LOG TIE-IN AT 9900'WITH(-20)'CORRECTION. OBTAIN SPRS AT 10,000'. PUMP 1:0.5 BPM=1564 PSI,1.0 BPM=2194 PSI,1.6 BPM=3032 PSI PUMP 2:0.5 BPM=1512 PSI,1.0 BPM=2073 PSI,1.6 BPM=3062 PSI 15:15 - 21:30 6.25 STWHIP P WEXIT TAG WHIPSTOCK AT 10,041'WITH 2K DOWN AND PUMP OFF,29K PUW FREESPIN 3100 PSI AT 1.67 BPM BEGIN TIME MILLING WINDOW AT 1 FPH FROM 10,040.5'. INCREASE IN MOTORWORK 200-300 PSI EACH TENTH.AT 10,042'MILL AS DRILL OFF DICTATES WITH 0.1'EVERY—4 MIN. MILL TO 10,045.7'. 21:30 - 00:00 2.50 STWHIP P WEXIT DRILL 10'OF NEW FORMATION F/10,045'- 10,056'MD. FS 3164-PSI AT 1.6 BPM.IA/OA 85/205. MW IN/OUT 8.8-PPG/8.8-PPG. DRESS AND DRY DRIFT WINDOW. 5/23/2013 00:00 - 03:30 3.50 DRILL P PROD1 POOH FROM 10,056'MD TO SURFACE. FLOW CHECK-WELL STATIC. LD WINDOW MILLING BHA. GUAGE MILLS(2.74-GO,2.73-NO GO). CHECK TREE BOLTS-GOOD. 03:30 - 07:00 3.50 DRILL P PROD1 HELD PJSM,MU BHA#4(BUILD ASSEMBLY). GET ON WELL,PRESSURE TEST QTS TO 250/3500 PSI,GOOD. RIH F/71'-9900'MD.TIE-IN WITH(-20)'DEPTH CORRECTION. Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 5 of 10 Operation Summary Report Common Well Name:F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/19/2013 End Date:5/28/2013 X3-013G0-C:(2,778,205.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING©67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 09:30 2.50 DRILL P PROD1 TAG END OF RATHOLE AT 10,057'AND DRILL AHEAD. FREESPIN 3100 PSI AT 1.67 BPM IN/OUT,MW 8.85/8.84 PPG IN/OUT. INITIAL ROP 40 FPH AT 1.1 K#DHWOB. GET SPRS AT 10100' PUMP 1:0.5 BPM=1410 PSI,1.0 BPM=2010 PSI,1.6 BPM=3076 PSI PUMP 2:0.5 BPM=1400 PSI,1.0 BPM=1990 PSI,1.6 BPM=3075 PSI 09:30 - 12:30 3.00 DRILL P PROD1 DRILL FROM 10,160'. 1.82 BPM IN/OUT AT 3530 PSI. 9.73 PPG ECD,PRESSURE ANNULAR/BORE 4405/5217 PSI. ROP SLOWAT 10 FPH FROM 10,181-10,200' BHA WIPER. 12:30 - 19:00 6.50 DRILL P PROD1 DRILL AHEAD FROM 10,200'. FS 3250 PSI AT 1.8 BPM IN/OUT. ROP 5 FPH WITH 150-200 PSI MOTOR WORK AND 2K#DHWOB. DRILL TO 10235'. 19:00 - 20:30 1.50 EVAL P PROD1 LOG PARENT WELL TIE IN. TOW-10040.30'MD BOW-10046.80'MD RA TAG-10045.5'MD 20:30 - 23:30 3.00 DRILL P PROD1 PJSM AND POOH. LD BHA#4.BIT GRADE 7-2 REPLACE WITH NEW BIT 23:30 - 00:00 0.50 DRILL P PROD1 GET ON WELL WITH INJECTOR.TEST QTS 250/3500-PASSED. RIH WITH BHA#5 FROM SURFACE TO 2,655MD. 5/24/2013 00:00 - 02:30 2.50 DRILL P PROD1 RIH WITH BHA#5 FROM 2,655MD TO 10,237'MD LOG TIE-IN-19.5'DEPTH CORRECTION. GET SPRS AT 10200' PUMP 1:0.5 BPM=1400 PSI,1.0 BPM=2005 PSI,1.6 BPM=3100 PSI PUMP 2:0.5 BPM=1395 PSI,1.0 BPM=1990 PSI,1.6 BPM=3080 PSI 02:30 - 06:00 3.50 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"BUILD SECTION F/ 10,237'TO 10,290'MD. PUMP RATE:1.72 BPM MM OUT:1.72 BPM PUMP PRESSURE:3100-3195 PSI DIFF PRESSURE:150-200 PSI MW IN/OUT:8.82/8.84 PPG WOB:0.5-1.0 KLBS ECD:9.74 PPG PVT:366 BBL Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 6 of 10 Operation Summary Report Common Well Name:F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/19/2013 End Date:5/28/2013 X3-013G0-C:(2,778,205.00) Project Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 10:00 4.00 DRILL P PROD1 CREW CHANGE.PRE-TOUR CHECKS AND WALK AROUNDS. DRILL FROM 10,290'AT 15-25 FPH. 1.72 BPM IN/OUT AT 3150 PSI. KEEPING WOB BELOW 1.0K# ECD 9.79 PPG WITH 8.84 PPG POWERVIS IN/OUT. DRILL TO 10,350'. 10:00 - 13:00 3.00 DRILL P PROD1 DRILL FROM 10,350'TO 10,390' 1.72 BPM IN/OUT AT 3200 PSI WOB 1-1.5K#,ROP 15 FPH CHERT 30%IN SAMPLES 13:00 - 17:00 4.00 DRILL P PROD1 DRILL FROM 10,390'TO 10,450'. 1.72 BPM IN/OUT AT 3250 PSI. VARIABLE ROP WITH 40-50%CHERT IN SAMPLES. AT 10,440'ROP DEGRADES TO 4 FPH. 17:00 - 20:00 3.00 DRILL P PROD1 POH FOR NEW BIT. FLOW CHECK AT WINDOW,5 MIN,GOOD. OPEN EDC AND POH CIRCULATING AT MAX RATE. FLOW CHECK AT SURFACE,5 MINS,GOOD. 20:00 - 20:30 0.50 DRILL P PROD1 GET OF WELL WITH INJECTOR. LD BIT(4-1),INSPECT MOTOR/MWD TOOLS. MU NEW BIT,GET ONTO WELL,TEST QTS 250/3500-PASSED. 20:30 - 23:00 2.50 DRILL P PROD1 RIH WITH BHA#6 FROM 71'-9,500'MD. LOG TIE-IN-20'DEPTH CORRECTION. GET SPRS AT 10,400' PUMP 1:0.5 BPM=1425 PSI,1.0 BPM=2014 PSI,1.6 BPM=2732 PSI PUMP 2:0.5 BPM=1410 PSI,1.0 BPM=2020 PSI,1.6 BPM=2743 PSI 23:00 - 00:00 1.00 DRILL P PROD1 DIRECTIONAL DRILL 3"BUILD SECTION F/ 10,450'TO 10,465'MD. PUMP RATE:1.62 BPM MM OUT:1.62 BPM PUMP PRESSURE:3000-3125 PSI DIFF PRESSURE:50-100 PSI MW IN/OUT:8.84/8.83 PPG WOB:1.0-1.85 KLBS ECD:9.77 PPG PVT:352 BBL 5/25/2013 00:00 - 06:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 3"BUILD SECTION F/ 10,465'TO 10,575'MD. PUMP RATE:1.62 BPM MM OUT:1.62 BPM PUMP PRESSURE:3000-3125 PSI DIFF PRESSURE:50-100 PSI MW IN/OUT:8.84/8.83 PPG WOB:1.0-1.85 KLBS ECD:9.8 PPG PVT:348 BBL Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 7 of 10 Operation Summary Report Common Well Name:F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:5/19/2013 End Date:5/28/2013 X3-013G0-C:(2,778,205.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA I UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING©67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 07:00 1.00 DRILL P PROD1 CREW CHANGE,CHECK AND WALK AROUNDS. DRILL FROM 10,575'TO 10,605'AT ROP OF 30 FPH. LAND BUILD AT 10,605'. 07:00 - 09:30 2.50 DRILL P PROD1 POH WITH BUILD BHA. FLOW CHECK ABOVE WINDOW FOR 5 MIN, NO FLOW. OPEN EDC POH CICULATINGAT2.4 BPM,3770 PSI. 09:30 - 10:30 1.00 DRILL P PROD1 TAG UP AT SURFACE,FLOW CHECK WELL 5 MIN,NO FLOW. TRIP SHEET SHOWS 0 BBLS LOST/GAINED DURING POH. CLOSE EDC,POWER DOWN BHA. GET OFF WELL,SI ANNULAR,BLOW DOWN BHA VITH WATER AND AIR. OPEN ANNULAR,LAY DOWN BHA. 2.7X3"HYC BIT RATED 2-1 MAKE UP LATERAL BHA WITH 0.9 AKO MOTOR AND NEW HYC 2.7X3"BIT 10:30 - 11:00 0.50 DRILL P PROD1 GET ON WELL. TEST QTS TO 250/3500 PSI 11:00 - 13:30 2.50 DRILL P PROD1 RIH WITH BHA#7 I LOG TIE-IN AT 9905'WITH(-19)'CORRECTION. RIH TO DRILLING DEPTH. 13:30 - 15:30 2.00 DRILL P PROD1 DRILL AHEAD FROM 10,605'to 10,680'. 1.73 BPM IN/OUT AT 3300 PSI • 1-2K#WOB W/25-30 FPH ROP. SWAP MUD SYSTEM. 15:30 - 18:00 2.50 DRILL P PROD1 MUD SWAP COMPLETE,8.55 PPG ALL THE i WAY AROUND.FREESPIN 2800 PSI. DRILL FROM 10,680'TO 10,735'. 1.72 BPM IN/OUT AT 2920 PSI. DHWOB 1-1.5K#,ROP 40-50 FPH. 18:00 - 00:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 3"LATERAL SECTION F/ 10,735'TO 11,040'MD. PUMP RATE:1.72 BPM MM OUT:1.72 BPM PUMP PRESSURE:3025-3150 PSI DIFF PRESSURE:100-150 PSI MW IN/OUT:8.58/8.61 PPG WOB:1.5-2.0 KLBS ECD:9.44 PPG PVT:425 BBL 5/26/2013 00:00 - 01:30 1.50 DRILL P PROD1 DRILL F/11,040'-11,050'MD. 'WIPER TRIP F/11,050'-10,000'MD. TIE-IN+2',RIH TO 11,050'MD. 01:30 - 05:00 3.50 DRILL P PROD1 DIRECTIONAL DRILL 3"LATERAL SECTION F/ 11,050'-11,196'MD. PUMP RATE:1.72 BPM MM OUT:1.72 BPM PUMP PRESSURE:3125-3215 PSI DIFF PRESSURE:100-150 PSI MW IN/OUT:8.58/8.61 PPG WOB:1.5-2.0 KLBS ECD:8.44 PPG PVT:425 BBL Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 8 of 10 Operation Summary Report Common Well Name:F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/19/2013 End Date:5/28/2013 :X3-013G0-C:(2,778,205.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475'W Active datum:ORIG KELLY BUSHING @67.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 08:00 3.00 DRILL P PROD1 WIPER F/11,196'-11,000'MD.RIH TO BOTTOM LOST MOTOR WORK. SLOWLY INCREASED WOB TO 4K,UNABLE TO GET ANY MOTOR WORK POOH F/11,196'-SURFACE. 08:00 - 09:00 1.00 DRILL P PROD1 PERFORM JOG AT SURFACE BACK TO 500'. FLOW CHECK 5 MIN,NO FLOW.GET OFF WELL. LAY DOWN BHA#7,BIT RATED 6-3 WITH FACE WORN FLAT. MU BHA#8 WITH NEW HYC 2.7X3" DURAFORCE 09:00 - 09:20 0.33 DRILL P � PROD1 GET ON WELL,PRESSURE TEST QTS TO 250/3500 PSI FOR 5 MIN.GOOD TEST 09:20 - 12:15 2.92 DRILL P PROD1 RIH WITH BHA#8. SET DOWN WITH 5-8K#AT SHALE AT 10,750'. CAME DOWN ON PUMPS AND GOT THROUGH. TIE-IN AT 9905'WITH(-20)'CORRECTION. GET SPRS AT 11150' PUMP 1:0.5 BPM=1392 PSI,1.0 BPM=1893 PSI,1.5 BPM=2629 PSI PUMP 2:0.5 BPM=1421 PSI,1.0 BPM=1912 PSI,1.5 BPM=2622 PSI FREESPIN 2965 PSI AT 1.7 BPM. 12:15 - 16:00 3.75 DRILL P i I PROD1 TAG 11,195 AND DRILL AHEAD TO 11,420'. 1.69 BPM IN/OUT AT 3250 PSI. 0.7-1.0 DHWOB AT 130-160 FPH ROP. 9.4 PPG ECD WITH 8.62 PPG IN/OUT POWERPRO. BHA WIPERS EVERY 50'BECAUSE OF HIGH ROP. 16:00 - 22:00 6.00 DRILL P PROD1 DRILL FROM 11,420'-11,575'MD. ROP DECREASE TO 30-50 FPH.DHWOB 1-1.5K# 1.5 BPM IN/OUT AT 2845 PSI. 8.62/8.64 PPG POWERPRO IN/OUT 9.44 PPG ECD. 22:00 - 00:00 2.00 DRILL P PROD1 WIPER F/11,575'-11,300'MD.RIH TO BOTTOM I LOST MOTOR WORK SLOWLY INCREASED WOB TO 4K,UNABLE TO GET ANY MOTOR WORK ,MOTOR STALLS OBSERVED,RUBBER CHUNKS RECOVERED FROM SHAKER. POOH F/11,575'-7000'MD. 5/27/2013 00:00 - 01:00 1.00 DRILL P I PROD1 POOH F/7000'-71'MD.FLOW CHECK-GOOD. GET OFF WELL,INSPECT BIT/MOTOR. BIT GRADE(5-3),MOTOR CHECK-FAILED. LD MOTOR,CHECK HOLE FILL. 01:00 - 02:00 1.00 DRILL P PROD1 HELD PJSM TO FUNCTION TEST BOPE AND TEST SAME. 02:00 - 02:30 0.50 DRILL P I PROD1 HELD PJSM TO MU BHA#9.MU NEW BIT AND MOTOR. STAB ONTO WELL,TEST QTS 250/3500- GOOD. 02:30 - 06:00 3.50 DRILL P PROD1 RIH F/71'-10,040'MD.LOGGED TIE-IN WITH -20'CORRECTION. CONTINUE RIH TO BOTTOM. Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 9 of 10 Operation Summary Report Common Well Name:F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/19/2013 End Date:5/28/2013 X3-013G0-C:(2,778,205.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 09:00 3.00 DRILL P PROD1 DRILL FROM 11,575'TO 11,750' ROP 60-90 FPH AT 1.2-2K#WOB. 1.69 BPM IN/OUT AT 3450 PSI,3100 PSI FREESPIN BHA WIPER AT 11,715'. 09:00 - 12:15 3.25 DRILL P PROD1 DRILL FROM 11,750'TO 12,010' ROP 100-130 FPH AT 1.3-1.7K#WOB. 1.69 BPM IN/OUT AT 3450 PSI,3100 PSI FREESPIN BHA WIPER AT 11,850'. 12:15 - 15:15 3.00 DRILL P PROD1 WIPER TO WINDOW PUMP 15 BBL HI-VIS SWEEP TIE-IN AT RA TAG WITH(+6)'CORRECTION DROPPED PUMP RATE TO MIN RATE TO GET DOWN THROUGH SHALES AT 10,750'AND 11,520-11,580'. 15:15 - 18:00 2.75 DRILL P PROD1 DRILL FROM 12,010'TO 12,196'MD. 1.67 BPM IN/OUT AT 3200 PSI. ROP FLUCTUATING,PUMP 50 BBLS OF NEW MUD TO SEE ROP MORE CONSISTENT AT 60-80 FPH. DHWOB 0.7-1.7K# 18:00 - 18:30 0.50 DRILL P PROD1 WIPER TRIP F/12,196'-11,850'MD. RIH TO 12,185'.STOP AND TROUBLESHOOT UNIT. 18:30 - 19:30 1.00 DRILL N SFAL 12,196.00 PROD1 NOTICED LEAK ON SLB POWER PACK.SHUT DOWN COIL MOVEMENT IN OPEN HOLE.CIRCULATE AT 1.5 BPM WHILE TROUBLSHOOTING POWER PACK. LEAK LOCATED ON A HYDRAULIC CONTROL BOX ON THE POWER PACK. MECHANICS NOTIFIED. 19:30 - 20:00 0.50 DRILL N SFAL 12,196.00 PROD1 POOH F/12,185'-12,085'MD.MONITOR HYDRAULIC LEAK WHILE POOH WILL CONTINUE TO MOVE COIL TO AVOID STUCK PIPE ISSUES. POOH F/12,085'-12,000'MD.PIPE FREE. MECHANIC TO BEGIN REPAIRS. 20:00 - 21:45 1.75 DRILL N SFAL 12,196.00 PROD1 HELD PJSM WITH SLB MECHANIC.CHANGED OUT HYDRALIC BLOCK ON SLB POWER PACK.POWER UP UNIT AND TEST SAME. NORMAL PRESSURE ON PRIORITY PRESSURE GUAGE IS 3000 PSI. NEW PRESSURE AFTER PARTS CHANGE IS 2200 PSI.UNIT IS FUNCTIONING AT A LOWER THAN NORMAL PRESSURE. MECHANIC WILL GET ANOTHER PART, OK GIVEN TO PROCEED WITH OPERATIONS AND MONITOR WHILE ANOTHER PART IS LOCATED AND INSTALLED. 21:45 - 22:30 0.75 DRILL P PROD1 WIPER TRIP F/12,000'-11,400'MD. RIH TO 12,196'MD. Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 10 of 10 Operation Summary Report Common Well Name:F-26 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/19/2013 End Date:5/28/2013 X3-013G0-C:(2,778,205.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:OOAM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING©67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 23:00 0.50 DRILL P PROD1 DIRECTIONAL DRILL 3"LATERAL SECTION F/ 12,196'-12,215'TOTAL DEPTH. PUMP RATE:1.66 BPM MM OUT:1.66 BPM PUMP PRESSURE:3125-3250 PSI DIFF PRESSURE:100-150 PSI MW IN/OUT:8.69/8.66 PPG WOB:1.5-2.0 KLBS ECD:9.44 PPG PVT:293 BBL 23:00 - 00:00 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW F/12,215'-11,500' MD. 5/28/2013 00:00 - 01:30 1.50 DRILL P PROD1 WIPER TRIP TO WINDOW F/11,500'-9,500' MD. OPEN EDC CIRCULATE MAX RATE. 01:30 - 02:00 0.50 DRILL N SFAL 12,215.00 PROD1 HELD PJSM WITH SLB MECHANIC.CHANGED OUT HYDRALIC BLOCK RELIEF CARTRIDGE ON SLB POWER PACK POWER UP UNIT AND TEST SAME. NORMAL PRESSURE ON PRIORITY PRESSURE GUAGE IS 3000 PSI. NEW PRESSURE AFTER PARTS CHANGE IS 2200 PSI.UNIT IS FUNCTIONING AT A LOWER THAN NORMAL PRESSURE. MECHANIC WILL GET ANOTHER PART, OK GIVEN TO PROCEED WITH OPERATIONS AND MONITOR WHILE ANOTHER PART IS LOCATED AND INSTALLED. 02:00 - 03:30 1.50 DRILL P PROD1 RIH F/9,500'-12,215'MD.LOG TIE-IN WITH +7.5'CORRECTION. CONFIRM TOTAL DEPTH-12,215'MD. 03:30 - 07:00 3.50 DRILL P PROD1 POOH F/12,215'-70'MD.LAY-IN LINER PILL. MM IN/OUT-0.65/0.45 MW IN/OUT-8.7/8.65 PPG PAINT EOP FLAG @ 9,200'MD. OPEN EDC PUMP MAX RATE POOH.MM IN/OUT-2.36/2.20 PAINT WINDOW FLAG©7,200'MD. 07:00 - 08:00 1.00 DRILL P PROD1 FLOW CHECK AT SURFACE,5 MIN,NO FLOW. GET OFF WELL,LAY DOWN BHA#9 BIT RATED 4-4. **END RON EVENT,CONTINUE ON F-26C CON EVENT 5/28/13** Printed 6/10/2013 9:56:19AM North America-ALASKA-BP Page 1 of 5 Operation Summary Report Common Well Name:F-26 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/28/2013 End Date:6/1/2013 X3-013G0-C:(1,439,935.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/28/2013 08:00 - 11:00 3.00 CASING P RUNPRD **BEGIN CON EVENT,CONTINUE FROM RON EVENT 5/28/13** INSTALL COIL CONNECTOR PUMP SLACK FORWARD,CUT 235'E-LINE. PULL TEST CONNECTOR TO 35K,PRESSURE TEST SAME TO 3800 PSI. PUMP 5/8"BALL THROUGH REEL TO CATCHER.LANDED AT 28 BBLS.RIG DOWN BALL CATCHER. RIG UP FLOOR FOR RUNING LINER. 11:00 - 15:00 4.00 CASING P RUNPRD PJSM FOR MU LINER. MU LINER ASSEMBLY WITH 82 JOINTS OF 2-3/8"L-80 HYDRIL 511.MU CONNECTIONS TO 850 FT LBS. WITH 5 JOINTS IN THE HOLE,PERFORM DRILL BY STABBING SAFETY JOINT.VERIFIED CROSSOVERS IN PLACE. FILL LINER EVERY 20 JOINTS. REPLACE PRIORITY PUMP ON POWERPACK TESTED AND FUNCTIONAL OPERATING 15:00 - 16:00 1.00 CASING P RUNPRD MU 2-7/8"PUP,X-NIP,2-7/8"PUP, DEPLOYMENT SLEEVE AND LINER RUNNING TOOLS. MU 4 JTS OF 2-3/8"PH6 AND QUICK CONNECT 16:00 - 16:45 0.75 CASING P RUNPRD GET ON WELL,PRESSURE TEST QTS TO 250/3500 PSI.GOOD. 16:45 - 18:15 1.50 CASING P RUNPRD RIH WITH 2-3/8"LINER PUMPING AT MINIMUM RATE. 18:15 - 20:00 1.75 CASING P RUNPRD PUWABOVE WINDOW IS 30K,WINDOW FLAG AT 10,036'SHOWS A(-11)'DIFFERENCE.NO CORRECTION MADE. SLIGHT WEIGHT CHANGE AT 10,750', CONTINUE IN HOLE. AT 12,040'AND 12,108'HAD TO PICKUP SEVERAL TIMES,WORK THROUGH. PU WEIGHT ON BOTTOM IS 35KLBS. TAG TD. 20:00 - 21:30 1.50 CASING P RUNPRD SPOT 10 BBLS KCL IN COIL. DROP 5/8"BALL. CIRCULATE BALL ON TO SEAT. 34 BBLS PUMPED,36.8 BBLS COIL VOL. PRESSURE TO 4300 PSI. SEAT SHEARED. PU ON COIL. FREE AT 22KLBS UP WT AT 0.25 BPM CIRC RATE. LINER RELEASED. RIH AND STACK 1OKLBS DN WT ON COIL. 21:30 - 00:00 2.50 CASING P RUNPRD DISPLACE WELL TO KCL PUMPED FIRST 95 BBL AT 2.03 BPM IN AND 2.03 BPM OUT WI 3600 PSI. BEGAN TAKING LOSSES AFTER 95 BBL PUMPED W/2.03 BPM IN AND 1.43 BPM OUT AND 3850 PSI. REDUCED PUMP RATE TO 1.53 BPM IN W/1.14 BPM OUT AND 2700 PSI. OUT RATE INCREASED TO 1.27BPM W/2650 PSI BY END OF DISPLACEMENT. 5/29/2013 00:00 - 01.30 1.50 CASING P RUNPRD POH W/LINER RUNNING BHA TO 137'. PUMPING AT 1.58 BPM IN W/1.03 OUT AT 1100 PSI. • Printed 6/10/2013 9:56:51AM North America-ALASKA-BP Page 2 of 5 Operation Summary Report Common Well Name:F-26 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/28/2013 End Date:6/1/2013 X3-013G0-C:(1,439,935.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 02:15 0.75 CASING P RUNPRD FLOWCHECK WELL. HOLD PJSM. BREAK AND UD LINER RUNNING BHA F/137' TO SURFACE. FLOWCHECK WELL OOH. HOLE STILL TAKING FLUID. 02:15 - 05:15 3.00 CEMT P RUNPRD HOLD PJSM AND M/U INNER STRING FOR CEMENTING. STRAP IN HOLE W/ 1"CSH TO CONFIRM PIPE TALLY. 05:15 - 08:00 2.75 CEMT P RUNPRD CIRCULATE THROUGH CSH AFTER 22 OF 44 STANDS RUN. LOST 9 BBL WHILE CIRCULATING THROUGH CSH. CONTINUE TO MAKE UP STANDS 23-44 FROM DERRICK.CIRCULATE THROUGH CSH.MU PH6. • 08:00 - 08:30 0.50 CEMT P RUNPRD STAB INJECTOR ON WELL,PRESSURE TEST QTS TO 250/3500 PSI. 08:30 - 12:00 3.50 CEMT P RUNPRD RIH WITH CEMENT STINGER ON 1"CSH. INITIAL CIRCULATING PRESSURE 450 PSI AT 0.6 BPM.SLOW DOWN FOR TUBING JEWELRY. REDUCE RUNNING SPEED TO 20 FPM,TAKE WEIGHT AT 9442'(GLM),INCREASE PUMP RATE TO 1.55 BPM AT 1710 PSI,2 BPM AND 3030 PSI,NO PROGRESS. EASE DOWN THROUGH MANDRIL AT 1.5 BPM. REDUCE PUMP RATE TO 0.5 BPM. EASE THROUGH TOP OF LINER. 12:00 - 13:00 1.00 CEMT P RUNPRD AT 12,000'PUW 27K,SOW 15K. PUMP 1 BPM AT 1300 PSI AND 0.5 BPM AT 500 PSI,NORMAL.SWAP TO REVERSE CIRCULATE AT 0.4 BPM AT 240 PSI. RIH TO SEAL DEPTH WITH PUMPS OFF. SEE WEIGHT AT 12,221'(UNCORRECTED). CONTINUE INTO 12,226'(UNCORRECTED). PUMP DOWN BACKSIDE AND PRESSURE UP TO 500 PSI AND HOLD FOR 2 MIN,NO COIL TUBING PRESSURE.BLED DOWN PRESSURE.LINE UP TO CIRCULATE NORMALLY.PUMP 0.5 BPM AT 600 PSI AND 1 BPM AT 1790 PSI. Printed 6/10/2013 9:56:51AM North America-ALASKA-BP Page 3 of 5 Operation Summary Report Common Well Name:F-26 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/28/2013 End Date:6/1/2013 X3-013G0-C:(1,439,935.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 16:00 3.00 CEMT P RUNPRD PJSM FOR CEMENTING.PRIME UP CEMENT PUMPS,PRESSURE TEST CEMENT LINE WITH 5 BBLS KCL TO 300 PSI LOW FOR 5 MIN, 6200 PSI HIGH FOR 5 MIN. BATCH UP 20 BBLS OF CEMENT,BATCH TIME 14:40. SEND SAMPLE TO LAB.PUMP EXHAUST PILL TO RIG VALVE. BEGIN PUMPING CEMENT,0 IN MICROMOTION AT 15.0 PPG DENSITY.PUMP 9.1 BBLS OF 15.8 CLASS G CEMENT INTO COIL.DISPLACE WITH 1.5 PPG POWERVIS WITH RIG PUMP AT 1.2 BPM IN,1 BPM OUT, WITH CEMENT AT SHOE RATE REDUCED TO 0.7 BPM AND 4100 PSI.LOSING 0.1 BPM WHILE PUMPING FLUID BEHIND LINER.AT 47.7 BBLS ON THE IN MICROMOTION,SHUT DOWN PUMPING.7.5 BBLS CEMENT BEHIND LINER IN PLACE AT 15:55.CALCULATED TOP OF CEMENT 10,076'. TEST BAKER FLOATS,GOOD. 16:00 - 19:00 3.00 CEMT P RUNPRD UNSTING FROM LINER,GET PUW BACK OF 27K.PULL UP TO 12,210'(UNCORRECTED). LAY IN 1 BBLS OF CEMENT WHILE POH AT 60 FPM.AT 11,700'CIRCULATE AT 1.8 BPM AND 3800 PSI.RIH TO 12,212'(UNCORRECTED—3' ABOVE FLAPPER)CIRCULATING AT MAX RATE.CIRCULATE 5 BBLS AND THEN POH 19:00 - 22:00 3.00 CEMT P RUNPRD PJSM.GET OFF WELL. L/D PH-6, DISCONNECT AND XO. RACK BACK 44 STANDS OF 1"CSH IN DERRICK. L/D CEMENTING STINGER. 22:00 - 00:00 2.00 EVAL P OTHCMP PJSM. MU 1.75"DSM MILL ON BTT 1-11/16" MOTOR. RUN 44 STANDS 1"CSH FROM DERRICK. 5/30/2013 00:00 - 02:30 2.50 EVAL P OTHCMP FINISH M/U 1.75"CLEANOUT BHAAND RUNNING 44 STANDS 1"CSH FROM DERRICK. STAB COIL.GET ON WELL. 02:30 - 07:00 4.50 EVAL P OTHCMP RIH W/1.75"CLEANOUT BHAAT 100 FPM, PUMPING 0.34 BPM,MM OUT 0.70 BPM, PUMP PRESSURE:560 PSI. CLEAN OUT LINER FROM 9516'TO PBTD OF 12,228'(UNCORRECTED). TAG PBTD WITH 1K DOWN. 07:00 - 09:30 2.50 EVAL P OTHCMP POH FROM PBTD CIRCULATING AT 1 BPM, 1850 PSI IN LINER. FLOW CHECK ABOVE LINER TOP,5 MIN,NO FLOW. POH TO SURFACE. FLOW CHECK AT SURFACE 5 MIN,NO FLOW 09:30 - 13:00 3.50 EVAL P OTHCMP STAND BACK INJECTOR. STAND BACK 44 STANDS OF 1"CSH IN DERRICK. LAY DOWN MOTOR AND MILL. 13:00 - 14:00 1.00 EVAL P OTHCMP LOAD LOGGING TOOL AND SOURCE TO RIG FLOOR. PJSM FOR SLM MEMORY LOGGING. CLEAR CELLAR AND RIG FLOOR TO LOAD SOURCE. Printed 6/10/2013 9:56:51AM North America-ALASKA-BP Page 4 of 5 Operation Summary Report Common Well Name:F-26 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/28/2013 End Date:6/1/2013 'X3-013G0-C:(1,439,935.00) • • Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 16:00 2.00 EVAL P OTHCMP MU 44 STANDS OF 1"CSH AND 4 JTS OF PH6. GET ON WELL WITH INJECTOR. PRESSURE TEST QTS TO 250/3500 PSI,GOOD TEST. 16:00 - 18:00 2.00 EVAL P OTHCMP RIH WITH LOGGING BHA FROM 2900'TO 9300'. 18:00 - 19:45 1.75 EVAL P • OTHCMP LOG DOWN FROM 9300'AT 30 FPM,PUMPING 0.55 BPM,MM OUT 0.65 BPM,PUMP • PRESSURE 840 PSI,MW IN/OUT 8.45 PPG. • • START DOWN HOLE WITH 40 BBLS PERF PILL TAG PBTD AT 12,219'MD(UNCORRECTED) 19:45 - 21:00 1.25 EVAL P OTHCMP LOG UP F/12,219'MD AT 60 FPM,PUMPING 0.55 BPM,MM OUT 0.35 BPM.PUMP PRESSURE 810 PSI,MW IN/OUT 8.43/8.51 PPG. PAINT FLAG AT 8900'EOP. 21:00 - 22:15 1.25 EVAL P OTHCMP POH F/9300'TO 2900'AT 100 FPM,PUMPING 1.11 BPM,MM OUT 0.70 BPM,PUMP PRESSURE 1600 PSI,MW IN/OUT 8.46/8.48 PPG. PAINT FLAG AT 6300'EOP. 22:15 - 00:00 1.75 EVAL P OTHCMP GET OFF WELL. UNSTAB COIL. BREAK AND L/D ALL X/O'S,DISCONNECTS, AND PH-6. R/B ALL 1"CSH IN DERRICK. 5/31/2013 00:00 - 01:00 1.00 EVAL P OTHCMP FINISH RACKING BACK 1"CSH AND L/D LOGGING TOOLS. 01:00 - 03:30 2.50 PERFOB P OTHCMP PJSM WITH ALL CREW. LOAD GUNS INTO PIPE SHED. RU FLOOR TO PU GUNS. REVIEW NORDIC PROCED.AND SLB HARC. DOWNLOAD LOG DATA AND SEND TO TOWN. CORRECTED PBTD FROM MEMORY LOG 12,200.0'MD. 03:30 - 07:15 3.75 PERFOB P OTHCMP MU 212.67"OF GUNS AND E-FIRE HEAD.RUN 88 JTS CSH AND 4 JTS PH6 BHA. STAB COIL. GET ON WELL. PRESS TEST QTS TO 250 AND 3600 PDI. PASSED. 07:15 - 09:00 1.75 PERFOB P OTHCMP RIH WITH PERFORATING BHA. PUMP 0.3 BPM AT 500 PSI. 09:00 - 10:15 1.25 PERFOB P OTHCMP AT 11,997'CORRECT TO FLAG WITH(-21)'TO 11,976'.RIH TO TAG PLUG BACK TD OF 12,194'.ADJUST TO LOGGED PBTD WITH(+6)' CORRECTION TO 12,200'. PJSM WITH CREW FOR PERFORATING. REVIEW FIRING SEQUENCE.ARM E-FIRE HEAD.FIRE PERF GUNS AT 10:13 MOVING SLOWLY.SHOT DETECTOR AND LOSS OF RETURNS GIVE CONFIRMATION THAT SHOTS FIRED.PERF INTERVAL:11999-12199'FOR 200 FEET TOTAL SHOTS. 10:15 - 12:00 1.75 PERFOB P OTHCMP POH AT 25 FPM HOLDING 260 PSI BACK PRESSURE ON WELLHEAD.PUMP 1.1 BPM AT 3215 PSI. 12:00 - 13:15 1.25 PERFOB P OTHCMP AT 9474'ABOVE LINER TOP FLOW CHECK 10 MIN,NO FLOW POH AND TAG UP. Printed 6/10/2013 9:56:51AM • • North America-ALASKA-BP Page 5 of 5 Operation Summary Report Common Well Name:F-26 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/28/2013 End Date:6/1/2013 X3-013G0-C:(1,439,935.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1989 12:00:00AM Rig Release:6/1/2013 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'06.223"3 Long: 0148°45'41.475"W Active datum:ORIG KELLY BUSHING @67.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:15 - 15:30 2.25 PERFOB P OTHCMP I FLOW CHECK,GOOD GET OFF WELL. LAY DOWN PH6 STAND BACK 88 JTS 1"CSH 15:30 - 17:00 1.50 PERFOB P OTHCMP PJSM FOR LAYING DOWN PERF GUNS STAND BACK 5 STANDS CSH. LAY DOWN 10 PERF GUNS. ALL SHOTS FIRED. UNLOAD PERFORATING EQUIPMENT FROM RIG. FIRE DRILL IN SCR ROOM,ALL HANDS RESPONDED EFFICIENTLY. 17:00 - 18:00 1.00 WHSUR P POST MU NOZZLE,STINGER AND CHECKS FOR FP. 18:00 - 20:00 2.00 WHSUR P POST RIH TO 2500'WHILE LOADING DIESEL IN COIL. POH LAYING IN DEISEL,45 BBLS IN 4-1/2" TUBING. 20:00 - 22:30 2.50 RIGD P POST SPOT N2 TRUCK. HOLD PJSM. R/U AND PRESSURE TEST HARDLINE TO 300/3500 PSI LOW/HIGH. SET PUMP TRIPS TO 3200 PSI AND TEST SAME. WSL OBSERVED TESTS. 22:30 - 23:30 1.00 RIGD P POST HOLD PJSM AND BLOW DOWN COIL WITH N2. PUMPED 1800 SCFM N2 FOR 15 MIN. GET OFF WELL. BREAK OFF NOZZLE AND CHECKS. BEGIN CLEANING MUD TANKS. 23:30 - 00:00 0.50 WHSUR P POST HOLD PJSM. GREASE TREE VALVES. SET 4-1/16"CAMERON TYPE"H"BPV WITH T-BAR. CONTINUE CLEANING MUD TANKS. 6/1/2013 00:00 - 04:00 4.00 WHSUR P POST CLOSE MASTER AND SWAB VALVES. LEAK TIGHT TEST TREE VALVES. OPEN BOPS AND INSPECT RAMS. CHANGE OUT TOP SEALS IN ALL RAMS. CONTINUE CLEANING MUD TANKS. 04:00 - 06:00 2.00 WHSUR P POST NIPPLE DOWN BOPS. { CONTINUE TO CLEAN MUD TANKS. 06:00 - 08:00 2.00 WHSUR P { POST NU AND TEST TREE CAP TO 250/3500 PSI FOR 5 CHARTED MIN.GOOD TEST. WARM UP MOVE SYSTEM. i **RELEASE RIG AT 0800 6/1/13•• _CONTINEU ON RON EVENT B-05D 6/1/13 Printed 6/10/2013 9:56:51AM F-26C, Well History (Post Rig Sidetrack) Date Summary 06/03/13 T/I/0= BPV/0/0 Conduct PJSM Barriers= BPV, SSV, SV verified by bleeding tubing pressure off BPV LTT Pass. Removed 4"untapped blind flage and installed 4"tapped blind W/Chemical Jewlery.Torqued all Tree flanges to API Specs, (see log) Ru CIW lubricator W/4"CIW pulling tool PT'd lubricator to low of 300 PSI and high of 3500 PSI for 5 min each Pass(for each break). RIH and pull BPV#280 Tagging at 115". RU Ciw lubricator with 4"TWC#258 and setting tool RIH and set tagging at 115". RU lubricator with 4"CIW Pulling tool and PT Tree to low of 300 PSI and high of 5000 PSI for 5 Min each Fail. Pull TWC#258 Tagging at 115". RU new TWC#279 W setting tool RIH and set at 115". RU lubricator with 4" CIW Pulling tool PT'd tree to low of 300 PSI and high of 5000 PSI for 5 min each PASS. (Rolling test per Rob Bryan)charted and documented. RIH and pull TWC#279 Tagging at 115"RDMO. 06/05/13 DRIFT W/1.75"CENTRALIZER, 1 1/2"SAMPLE BAILER TO DEVIATION @ 10,542'SLM BRUSH&FLUSH TBG&DEPLOYMENT SLV TO 9500'SLM. LRS PUMPED 18 BBLS CRUDE DOWN TBG (pressured up to max). DRIFT W/20'x 3.70" DUMMY WHIPSTOCK,3.50" LIB, S/D @ 9496'SLM. 06/05/13 T/I/O=0/65/176.Temp=Sl. Post CTD.Assist Slickline,.Pump 5 bbl neat spear and 13 bbls crude while slickline brushes. 06/06/13 LIB RETURNED CLEAN IMPRESSION OF 3.70" DEP SLV @ 9496'SLM. SET 4 1/2" BAKER 45 KB LTP W/HES DPU IN DEP SLV @ 9508'SLM(29'oal)(2.37"min ID). DRIFT TO 2-3/8"LINER&BRUSH X-NIPPLE @ 9515'SLM/9528'MD. SET 2 7/8"XX PLUG @ 9515'SLM/9528'MD. LRS PERFORMED PASSING MIT-T TO 2000 psi (see Irs log). PULLED 2 7/8"XX-PLUG @ 9515'SLM/ 9528'MD. SET 4 1/2"WHIDDON CATCHER @ 9468'SLM. PULLED STA#4 RK-DGLV @ 5844'SLM/ 5861'MD. PULLED STA#5 RK-DGLV @ 3073'SLM/3092'MD. 06/06/13 Assist slickline. MIT-T to 2000 PSI***PASSED***Pumped 4 bbls crude down TBG to reach test pressure. In 1st 15 minutes tbg lost 52 psi, in 2nd 15 minutes,tbg lost 25 psi for a total loss of 77 psi in a 30 minute test. Bled back—3 bbls to 200 PSI. FWHP=186/69/192. IA/OA=OTG Slickline on well at LRS Departure. 06/07/13 SET STA#5 RK-LGLV @ 3073'SLM/3092'MD. SET STA#4 RK-OGLV @ 5846'SLM/5861'MD PULLED EMPTY WHIDDON FROM 9468'SLM. Page 1 of 1 NMI BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-26 - Slot 26 / Lat: 070°20'06.223"3 Long: 0148°45'41.475"W F-26C Survey: MWD Survey Report - Geographic 04 June, 2013 Qbp • Mill BAKER HUGHES Survey Report-Geographic 0 bp LNTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: 27:26 11/25/1989 00:00 @ 67.71 usft(generic drilling ri Site: PB F Pad MD Reference: 27:26 11/25/1989 00:00 @ 67.71 usft(generic drilling ri Well: F-26 North Reference: True Wellbore: F-26C Survey Calculation Method: Minimum Curvature Design: F-26C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29 usft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70 usft Longitude: 148°46'31.47 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: 1.15° Well . F-26 API No. 500292198700 Well Position +N/-S 0.00 usft Northing: 5,973,674.00 usft Latitude: 70°20'6.223 N +E/-W 0.00 usft Easting: 652,649.79 usft Longitude: 148°45'41.47 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 35.50 usft Wellbore F-26C API no. 500292198703 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°1 (°I (nT) BGGM2012 5/22/2013 20.39 81.04 57,625 Design F-26C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,019.88 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 32.21 0.00 0.00 202.00 Survey Program Date: 6/4/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 38.50 9,865.20 1 :Schlumberger GCT multishot(F-26) GCT-MS Schlumberger GCT multishot 9,875.00 10,019.88 MWD(F-26B) MWD MWD-Standard 10,040.30 12,215.00 MWD(F-26C) MIND MWD-Standard 6/4/2013 2:06:48PM Page 2 COMPASS 5000.1 Build 61 ES kW BJUCIER HUGHES Survey Report-Geographic bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay ND Reference: 27:26 11/25/1989 00:00 @ 67.71 usft(generic drilling ri Site: PB F Pad MD Reference: 27:26 11/25/1989 00:00 @ 67.71 usft(generic drilling ri Well: F-26 North Reference: True Wellbore: F-26C Survey Calculation Method: Minimum Curvature Design: F-26C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,019.88 42.73 165.72 8,672.94 -4,016.20 -437.89 5,969,650.01 652,293.76 70°19'26.724 N 148°45'54.26 W TIP 10,040.30 40.21 160.93 8,688.24 -4,029.15 -434.03 5,969,637.15 652,297.88 70°19'26.597 N 148°45'54.14 W KOP 10,060.81 37.57 165.42 8,704.21 -4,041.47 -430.29 5,969,624.91 652,301.87 70°19'26.476 N 148°45'54.03 W 10,090.89 33.82 172.94 8,728.64 -4,058.66 -426.95 5,969,607.79 652,305.56 70°19'26.307 N 148°45'53.94 W 10,106.53 32.25 177.40 8,741.76 -4,067.15 -426.23 5,969,599.32 652,306.46 70°19'26.223 N 148°45'53.91 W 10,136.60 29.82 192.53 8,767.56 -4,082.49 -427.49 5,969,583.96 652,305.51 70°19'26.072 N 148°45'53.95 W 10,166.60 25.28 202.26 8,794.16 -4,095.72 -431.53 5,969,570.65 652,301.73 70°19'25.942 N 148°45'54.07 W 10,196.53 24.51 220.20 8,821.35 -4,106.39 -437.97 5,969,559.86 652,295.51 70°19'25.837 N 148°45'54.26 W 10,226.58 25.63 236.45 8,848.60 -4,114.75 -447.42 5,969,551.30 652,286.23 70°19'25.755 N 148°45'54.53 W 10,256.58 29.35 246.74 8,875.23 -4,121.25 -459.60 5,969,544.56 652,274.20 70°19'25.691 N 148°45'54.89 W 10,286.68 33.02 257.48 8,900.99 -4,125.94 -474.40 5,969,539.56 652,259.50 70°19'25.645 N 148°45'55.32 W 10,316.58 38.22 264.90 8,925.30 -4,128.53 -491.58 5,969,536.62 652,242.37 70°19'25.620 N 148°45'55.82 W 10,346.68 44.07 269.46 8,947.96 -4,129.46 -511.34 5,969,535.30 652,222.63 70°19'25.610 N 148°45'56.40 W 10,376.69 49.85 272.86 8,968.44 -4,128.99 -533.26 5,969,535.32 652,200.71 70°19'25.615 N 148°45'57.04 W 10,406.64 55.74 274.50 8,986.54 -4,127.44 -557.05 5,969,536.38 652,176.90 70°19'25.630 N 148°45'57.73 W 10,438.34 62.59 274.95 9,002.78 -4,125.20 -584.16 5,969,538.07 652,149.75 70°19'25.652 N 148°45'58.52 W 10,467.43 68.96 279.83 9,014.72 -4,121.76 -610.44 5,969,540.98 652,123.41 70°19'25.686 N 148°45'59.29 W 10,496.61 73.74 287.80 9,024.06 -4,115.14 -637.25 5,969,547.05 652,096.47 70°19'25.751 N 148°46'0.07 W 10,526.63 78.47 295.17 9,031.28 -4,104.46 -664.33 5,969,557.17 652,069.18 70°19'25.856 N 148°46'0.86 W 10,555.39 80.06 293.04 9,036.63 -4,092.92 -690.12 5,969,568.18 652,043.16 70°19'25.970 N 148°46'1.62 W 10,585.62 84.84 288.06 9,040.61 -4,082.42 -718.17 5,969,578.12 652,014.91 70°19'26.073 N 148°46'2.44 W 10,616.94 87.79 284.71 9,042.62 -4,073.60 -748.15 5,969,586.32 651,984.76 70°19'26.160 N 148°46'3.31 W 10,645.74 88.19 283.03 9,043.63 -4,066.70 -776.09 5,969,592.65 651,956.68 70°19'26.227 N 148°46'4.13 W 10,675.73 89.11 280.42 9,044.34 -4,060.61 -805.44 5,969,598.14 651,927.22 70°19'26.287 N 148°46'4.98 W 10,705.80 89.97 278.02 9,044.58 -4,055.79 -835.12 5,969,602.35 651,897.45 70°19'26.335 N 148°46'5.85 W 10,736.04 90.15 274.74 9,044.55 -4,052.43 -865.17 5,969,605.10 651,867.34 70°19'26.368 N 148°46'6.73 W 10,764.46 90.61 271.16 9,044.36 -4,050.97 -893.54 5,969,605.98 651,838.94 70°19'26.382 N 148°46'7.55 W 10,795.88 92.61 269.64 9,043.47 -4,050.75 -924.95 5,969,605.56 651,807.54 70°19'26.384 N 148°46'8.47 W 10,826.86 90.68 266.05 9,042.59 -4,051.92 -955.89 5,969,603.77 651,776.63 70°19'26.373 N 148°46'9.37 W 10,854.54 91.17 263.68 9,042.14 -4,054.39 -983.45 5,969,600.73 651,749.13 70°19'26.348 N 148°46'10.18 W 10,883.54 89.85 261.02 9,041.88 -4,058.25 -1,012.19 5,969,596.29 651,720.48 70°19'26.310 N 148°46'11.02 W 10,914.75 89.66 260.29 9,042.01 -4,063.32 -1,042.98 5,969,590.59 651,689.79 70°19'26.260 N 148°46'11.92 W 10,945.52 90.83 257.18 9,041.88 -4,069.33 -1,073.16 5,969,583.97 651,659.75 70°19'26.201 N 148°46'12.80 W 10,974.30 89.23 252.97 9,041.87 -4,076.74 -1,100.96 5,969,576.00 651,632.11 70°19'26.128 N 148°46'13.61 W 11,004.28 89.60 249.34 9,042.17 -4,086.42 -1,129.32 5,969,565.74 651,603.95 70°19'26.033 N 148°46'14.44 W 11,035.26 90.74 247.07 9,042.08 -4,097.93 -1,158.09 5,969,553.66 651,575.43 70°19'25.920 N 148°46'15.28 W 11,063.22 90.71 243.93 9,041.73 -4,109.52 -1,183.52 5,969,541.55 651,550.23 70°19'25.806 N 148°46'16.02 W 11,094.08 91.66 240.14 9,041.09 -4,123.98 -1,210.77 5,969,526.54 651,523.29 70°19'25.663 N 148°46'16.81 W 11,125.98 90.34 234.92 9,040.53 -4,141.10 -1,237.67 5,969,508.88 651,496.75 70°19'25.495 N 148°46'17.60 W 11,152.94 90.55 232.26 9,040.32 -4,157.10 -1,259.36 5.969,492.44 651,475.38 70°19'25.338 N 148°46'18.23 W 11,189.83 89.08 225.93 9,040.44 -4,181.24 -1,287.23 5,969,467.73 651,448.02 70°19'25.100 N 148°46'19.04 W 11,222.34 89.36 221.67 9,040.88 -4,204.70 -1,309.72 5,969,443.83 651,426.01 70°19'24.869 N 148°46'19.70 W 11,252.98 88.71 218.44 9,041.40 -4,228.15 -1,329.44 5,969,419.99 651,406.78 70°19'24.639 N 148°46'20.28 W 11,281.97 87.14 212.78 9,042.45 -4,251.69 -1,346.30 5,969,396.11 651,390.40 70°19'24.407 N 148°46'20.77 W 11,312.23 87.94 213.71 9,043.75 -4,276.97 -1,362.87 5,969,370.49 651,374.34 70°19'24.159 N 148°46'21.25 W 11,344.34 90.22 216.70 9,044.27 -4,303.20 -1,381.38 5,969,343.90 651,356.38 70°19'23.901 N 148°46'21.79 W 11,373.61 90.18 219.40 9,044.16 -4,326.25 -1,399.42 5,969,320.49 651,338.81 70°19'23.674 N 148°46'22.32 W 11,405.00 90.22 223.55 9,044.05 -4,349.76 -1,420.20 5,969,296.56 651,318.51 70°19'23.443 N 148°46'22.92 W 11,432.65 93.11 225.45 9,043.25 -4,369.47 -1,439.57 5,969,276.46 651,299.55 70°19'23.249 N 148°46'23.49 W 11,461.76 93.44 229.03 9,041.59 -4,389.20 -1,460.90 5,969,256.30 651,278.62 70°19'23.055 N 148°46'24.11 W 11,493.20 94.06 233.46 9,039.53 -4,408.83 -1,485.36 5,969,236.17 651,254.57 70°19'22.861 N 148°46'24.83 W 11,522.53 93.25 236.20 9,037.66 -4,425.69 -1,509.29 5,969,218.83 651,231.00 70°19'22.696 N 148°46'25.52 W 11,553.02 91.97 240.75 9,036.27 -4,441.61 -1,535.24 5,969,202.39 651,205.37 70°19'22.539 N 148°46'26.28 W 6/4/2013 2:06.48PM Page 3 COMPASS 5000.1 Build 61 RIM BAKER HIS Survey Report-Geographic 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: 27:26 11/25/1989 00:00 @ 67.71 usft(generic drilling ri Site: PB F Pad MD Reference: 27:26 11/25/1989 00:00 @ 67.71usft(generic drilling ri Well: F-26 North Reference: True Wellbore: F-26C Survey Calculation Method: Minimum Curvature Design: F-26C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,582.84 89.17 242.77 9,035.97 -4,455.72 -1,561.51 5,969,187.75 651,179.40 70°19'22.400 N 148°46'27.05 W 11,613.00 91.84 247.17 9,035.71 -4,468.48 -1,588.83 5,969,174.44 651,152.35 70°19'22.275 N 148°46'27.85 W 11,642.96 91.93 252.61 9,034.72 -4,478.77 -1,616.93 5,969,163.58 651,124.46 70°19'22.173 N 148°46'28.67 W 11,673.03 89.63 254.86 9,034.31 -4,487.19 -1,645.79 5,969,154.58 651,095.78 70°19'22.091 N 148°46'29.51 W 11,703.08 89.82 250.78 9,034.46 -4,496.06 -1,674.50 5,969,145.12 651,067.27 70°19'22.003 N 148°46'30.35 W 11,733.89 89.54 247.05 9,034.63 -4,507.14 -1,703.24 5,969,133.46 651,038.76 70°19'21.894 N 148°46'31.18 W 11,762.94 91.50 243.64 9,034.36 -4,519.26 -1,729.63 5,969,120.81 651,012.62 70°19'21.775 N 148°46'31.95 W 11,796.19 91.87 238.86 9,033.39 -4,535.24 -1,758.76 5,969,104.24 650,983.82 70°19'21.618 N 148°46'32.80 W 11,823.43 91.08 235.48 9,032.68 -4,550.00 -1,781.64 5,969,089.02 650,961.25 70°19'21.472 N 148°46'33.47 W 11,854.53 90.80 232.09 9,032.17 -4,568.37 -1,806.73 5,969,070.14 650,936.54 70°19'21.292 N 148°46'34.20 W 11,885.01 90.25 227.78 9,031.90 -4,587.98 -1,830.05 5,969,050.06 650,913.63 70°19'21.099 N 148°46'34.88 W 11,913.04 89.85 224.52 9,031.87 -4,607.40 -1,850.26 5,969,030.24 650,893.82 70°19'20.908 N 148°46'35.47 W 11,943.92 90.25 221.21 9,031.84 -4,630.03 -1,871.26 5,969,007.19 650,873.28 70°19'20.685 N 148°46'36.09 W 11,973.62 90.18 217.20 9,031.73 -4,653.04 -1,890.03 5,968,983.80 650,854.99 70°19'20.459 N 148°46'36.63 W 12,007.20 88.40 213.06 9,032.15 -4,680.49 -1,909.35 5,968,955.96 650,836.23 70°19'20.189 N 148°46'37.20 W 12,032.91 89.60 209.22 9,032.60 -4,702.49 -1,922.64 5,968,933.70 650,823.39 70°19'19.972 N 148°46'37.59 W 12,062.88 90.64 204.55 9,032.53 -4,729.21 -1,936.19 5,968,906.71 650,810.39 70°19'19.710 N 148°46'37.98 W 12,092.95 89.39 198.66 9,032.53 -4,757.16 -1,947.25 5,968,878.55 650,799.90 70°19'19.435 N 148°46'38.30 W 12,123.42 90.49 195.19 9,032.56 -4,786.30 -1,956.12 5,968,849.23 650,791.63 70°19'19.148 N 148°46'38.56 W 12,153.05 90.03 191.40 9,032.42 -4,815.13 -1,962.94 5,968,820.27 650,785.40 70°19'18.864 N 148°46'38.76 W 12,175.52 88.56 186.30 9,032.70 -4,837.33 -1,966.39 5,968,798.01 650,782.40 70°19'18.646 N 148°46'38.86 W 12,215.00 88.56 186.30 9,033.69 -4,876.56 -1,970.72 5,968,758.71 650,778.87 70°19'18.260 N 148°46'38.99 W TD-PRODUCTION LINER 1 6/4/2013 2:06:48PM Page 4 COMPASS 5000.1 Build 61 V OF Ty ,w \\ I%% s, THE STATE Alaska Oil and Gas � � °fALAS� Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue Anchorage, Alaska 99501-3572 ALAS Main: 907.279.1 433 Fax: 907.276.7542 John McMullen Engineering Team Leader BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-26C BP Exploration (Alaska), Inc. Permit No: 213-045 Surface Location: 2140' FSL, 2197' FEL, SEC. 02, T11N, R13E, UM Bottomhole Location: 2630' FSL, 4161' F , SEC. 11, T11N, R13E, UM Dear Mr. McMullen: ``�� Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P. Foerster Chair DATED this day of March, 2013. "1 � 37�" I"ri STATE OF ALASKA r ALA; DIL AND GAS CONSERVATION COMM DN ��1-�"' `� 21113 PERMIT TO DRILL 20 AAC 25.005 AOGCC 1 a.Type of work: 1 b.Proposed Well Class: Development Oil ❑Service Winj ®Single Zone 1 c.Specify if well is proposed for: ❑Drill . ❑Lateral ❑Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone ❑Coalbed Gas ❑Gas Hydrates ®Redrill ❑Reentry ❑Exploratory ❑Service-WAG ❑Service-Disp ❑Geothermal ❑Shale Gas 2.Operator Name: 5.Bond ®Blanket ❑Single Well 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193 • PBU F-26C - 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12075' • TVD 8966'ss • Prudhoe Bay/Prudhoe Bay 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028280 2140' FSL,2197' FEL, Sec.02,T11 N, R13E, UM • • Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 3480' FSL,2486' FEL, Sec. 11,T11 N, R13E, UM May 15,2013 Total Depth C P.3 -;.,v, 13 9.Acres in Property: 14.Distance to Nearest Property: 2630' FSL,4161' Sec.. 11,T11 N, R13E, UM 2560 4b. Location of Well(State Base Plane Coordinates NAD 27 ( 27): 10.K6 Elevation above MSL: 67.71' ' feet 15.Distance to Nearest Well Open Surface: x 652650 • y-5973674 . Zone- ASP4 GL Elevation above MSL: 36.46' . feet to Same Pool: 16.Deviated Wells: Kickoff Depth: 10040' • feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Downhole: Surface: Maximum Hole Angle: 93 • degrees 3188 2308 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight r Grade Coupling Length MD ND MD ND (including stage data) 3-1/4" 2-3/8" 4.7# L-80 STL 2555' 9520' 8215'ss 12075' 8966'ss 48 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): I Plugs(measured): Effective Depth MD(ft): I Effective Depth ND(ft): - Junk(measured): 11672' 9036' 11075' 11639' 9035' Unknown Casing Length Size Cement Volume MD TVD Conductor/Structural 110' 20"x 30" 110' _ 110' Surface 2685' 13-3/8" 4198 cu ft Arctic Set II&Ill _ 2685' _ 2685' Intermediate 9839' 9-5/8" 2075 cu ft Class'G' _ 9839' 8534' Production _ Liner _ 289' 5-1/2" 498 cu ft Class'G' 9587'-9876' _ 8335'-8564' Liner 2106' 3-1/2"x 3-3/16"x 2-7/8" 140 cu ft Class'G' 9566'-11672' 8318'-9036' Perforation Depth MD(ft): 10544'-11630' Perforation Depth ND(ft): 9031'-9035' 20.Attachments: ❑Property Plat ®BOP Sketch ®Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis ®Diverter Sketch ❑Seabed Report ®Drilling Fluid Program 1E120 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Brad Gorham;564-4649 Printed Name John McMullen Title Engineering Team Leader Email Bradley.Gorham @bp.com Signature /44/L, /,/. vy,0 — /ee sr Phone 564-4711 Date Commission Use Only Permit To Drill / API Number: Permit Appr val t : See cover letter for Number: Z./_�C.' 50-029-21987-03-00 other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas El contained shales: Other: n P - �, �G 3 SG S� Samples Req'd ❑Yes 121/No Mud Log Req'd: ❑Yes BNo (� �/� H2S Measures: 'Yes ❑No Directional Survey Req'd: [i Yes ❑No Spacing exception req'd: ❑Yes 'No inclination-only svy Req'd: ❑Yes pf No APPROVED BY APPROVED BY COMMISSIONER THE COMMISSION Date 3 -22_ -() Fo This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit Form and Attachments In Duplica t. �° 'litsmA VLF 3/1// 13 ' ;^'� To: Alaska Oil & Gas Conservation Commission From: Brad Gorham b p CTD Engineer Date: March 13, 2013 Re: F-26C Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well F-26B using Nordic 2 to a target in Zone 2B. P r A Required Permit? Rig Work(scheduled to begin May 15th,2013) j 10-403 PTD 1. MIRU and test BOPE 250 psi low and 3,500 psi high. Yes No 2. Mill 2.74" window at 10,040' and 10'of rathole. No Yes 3. Drill build: 3.25" OH, 590' (24 deg DLS planned) No Yes 4. Drill lateral: 3.25" OH, 1,445' (12 deg DLS planned). No Yes 5. Run 2-3/8" liner leaving TOL at 9,520' MD No Yes 6. Pump primary cement job: 10 bbls, 15.8 ppg,TOC at 10,250' MD Yes* Yes 7. Perform liner cleanout and MCNL/GR/CCL log No Yes p 1 D 8. Test liner lap to 2400 psi. No Yes 2i3-0q5— 9. Perforate liner based on log interpretation (^200') No Yes 10. Freeze protect well to 2500' MD No Yes 11. Set BPV; RDMO No Yes * Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Set liner top packer if needed with slickline & test to 2,400psi. 3. Test separator. Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg PowerVis for milling window and drilling (747 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: 3.25" From 10,040' MD to 12,075' MD - Liner Program: • 2-3/8", 4.7 lb/ft, L-80, STL Solid liner 9,520' MD — 12,075' MD. • A minimum of 10 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 10,250' MD) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 93°, inclination at kick off point is 40°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property— 13,000'. • Distance to nearest well within pool —600' from F-02A. Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/MCNL logs will be run. - Perforating: • SWS 1.56", 6 spf, perf guns, 1" CSH work string, & 2-1/16" PH6 • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • None Hazards • F-Pad is considered an H2S pad. Well F-02A had 20 ppm H2S on 2/25/2012. • Most recent H2S level on G-15B is 19 ppm recorded on 4/07/2012. • No planned fault crossings. Reservoir Pressure • The reservoir pressure on F-26C is expected to be 3,188 psi at 8,800' TVDSS. (7.0) ppg - equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,308 psi. • An EMW of 8.4 ppg for this well will provide 655 psi over-balance to the reservoir. Brad Gorham CC: Well File CTD Engineer Joseph Lastufka North America - ALASKA - BP Prudhoe Bay PB F Pad F-26 F-26C F-26C Plan 1 Anticollision Report 14 February, 2013 4 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Site Error: 0.0ousft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset TVD Reference: Offset Datum Reference F-26C Plan 1 i Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 100.00usft Error Model: ISCWSA Depth Range: 10,040.00 to 12,075.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,404.28usft Error Surface: Elliptical Conic Survey Tool Program Date 14/02/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 38.50 9,865.20 1 :Schlumberger GCT multishot(F-26) GCT-MS Schlumberger GCT multishot 9,875.00 10,040.00 MWD(F-26B) MWD MWD-Standard 10,040.00 12,075.00 F-26C Plan 1 (F-26C) MWD MWD-Standard Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB F Pad F-02-F-02-F-02 11,242.18 10,700.00 495.69 219.65 284.22 Pass-Major Risk F-02-F-02A-F-02A 11,725.00 11,200.00 468.81 223.49 252.31 Pass-Major Risk F-03-F-03-F-03 Out of range F-03-F-03A-F-03A Out of range F-15-F-15-F-15 Out of range F-15-F-15A-F-15A Out of range F-15-F-15A-Plan#1(+500) Out of range F-16A-F-16A-F-16A Out of range F-17-F-17-F-17 Out of range F-17A_DIMS-F-17A-F-17A Out of range F-19--F-19A-F-19A Out of range F-26-F-26-F-26 10,310.72 10,300.00 55.39 18.57 43.07 Pass-Major Risk F-26-F-26A-F-26A 10,310.72 10,300.00 55.39 18.57 43.07 Pass-Major Risk F-26-F-26B-F-26B 10,098.22 10,100.00 11.12 1.68 9.44 Pass-Major Risk F-26-F-26B-Plan#3 10,099.10 10,100.00 37.32 3.23 34.10 Pass-Major Risk F-40-F-40-F-40 12,025.00 10,900.00 1,255.01 253.49 1,007.19 Pass-Major Risk F-44-F-44-F-44 10,460.00 9,852.00 1,194.99 152.70 1,052.69 Pass-Major Risk F-44-F-44A-F-44A 10,809.39 10,722.00 501.70 162.29 364.31 Pass-Major Risk F-44-F-44A-F-44A wp11 10,816.86 10,741.03 504.55 150.80 366.61 Pass-Major Risk F-46-F-46-F-46 Out of range F-46-F-46A-F-46A Out of range F-46-F-46A-Plan#5 Out of range PB G Pad G-12-G-12-G-12 10,172.89 10,748.00 1,344.09 723.28 827.76 Pass-Major Risk G-12-G-12A-G-12A 10,140.00 10,700.00 1,162.61 656.28 778.71 Pass-Major Risk G-15-G-15B-G-15B Out of range 14/02/2013 15:20:39 Page 2 of 15 COMPASS 5000.1 Build 61 • BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Site Error: O.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset TVD Reference: Offset Datum Offset Design PB F Pad- F-02-F-02-F-02 Offset Site Error: 0.00 usft Survey Program: 100-GYD-CT-CMS,8625-BOSS-GYRO Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usff) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (usft) (usft) (usft) 10,840.38 9,035.19 9,800.00 8,519.31 29.96 23.09 -49.64 -3457.75 -1,088.08 9.625 829.63 143.14 734.09 Pass-Major Risk 10,865.72 9,033.93 9,900.00 8,591.86 29.97 23.77 -49.53 -3,497.98 -1,143.90 9.625 764.16 150.20 657.73 Pass-Major Risk 10,900.00 9,032.27 10,000.00 8,882.87 30.00 24.55 -49.88 -3,538.16 -1,201.72 9.625 705.98 159.14 585.39 Pass-Major Risk 10,925.00 9,031.10 10,100.00 8,733.32 30.02 25.48 -48.29 -3,578.92 -1,259.82 9.625 654.90 167.16 520.10 Pass-Major Risk 11,075.00 9,032.61 10,200.00 8,803.02 30.16 26.59 -33.73 -3,620.35 -1,318.34 9.625 607.52 165.42 469.15 Pass-Major Risk 11,100.00 9,032.87 10,300.00 8,872.15 30.19 27.89 -31.12 -3,662.31 -1,377.17 9.625 561.00 174.34 407.71 Pass-Major Risk 11,136.81 9,033.04 10,400.00 8,941.05 30.24 29.37 -28.91 -3,704.55 -1,436.06 9.625 525.01 185.48 354.14 Pass-Major Risk 11,175.00 9,032.95 10,500.00 9,009.87 30.31 30.99 -26.01 -3,747.26 -1,494.94 9.625 501.45 197.10 313.64 Pass-Major Risk 11,205.00 9,032.69 10,600.00 9,077.82 30.37 32.80 -21.62 -3,790.83 -1,553.73 9.825 491.39 207.89 290.43 Pass-Major Risk,CC 11,242.18 9,032.27 10,700.00 9,145.43 30.45 34.79 -18.14 -3,835.18 -1,612.58 9.825 495.69 219.65 284.22 Pass-Major Risk,ES,SF 11,275.00 9,031.90 10,800.00 9,212.82 30.54 36.89 -1452 -3,880.46 -1,670.95 9.625 513.46 230.41 296.37 Pass-Major Risk 11,315.34 9,031.45 10,900.00 9,280.10 30.67 39.15 -12.90 -3,926.22 -1,729.09 9.825 543.71 241.51 323.78 Pass-Major Risk 11,325.00 9,031.34 10,940.00 9,307.01 30.70 40.06 -11.72 -3,94452 -1,752.35 9.625 559.09 245.13 339.28 Pass-Major Risk • 14/02/2013 15:20:39 Page 3 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay ND Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset ND Reference: Offset Datum Offset Design PB F Pad- F-02-F-02A-F-02A offset Site Error: 0.00 usft Survey Program: 100-GYD-CT-CMS,8625-BOSS-GYRO,10400-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) F) (usft) (usft) (soft) (usft) (usft) (usft) 10,840.38 9,035.19 9,800.00 8,519.31 29.96 23.09 -49.64 -3,457.75 -1,088.08 9625 82963 143.14 734.09 Pass-Major Risk 10,865.72 9,033.93 9,900.00 8,591.86 29.97 23.77 -49.53 -3,497.98 -1,143.90 9.625 764.16 150.20 657.73 Pass-Major Risk 10,900.00 9,032.27 10,000.00 8,662.87 30.00 24.55 -49.88 -3,538.16 -1,201.72 9.625 705.98 159.14 585.39 Pass-Major Risk 10,925.00 9,031.10 10,100.00 8,733.32 30.02 25.48 -48.29 -3,578.92 -1,259.82 9.625 654.90 167.16 520.10 Pass-Major Risk 11,075.00 9,032.61 10,200.00 8,803.02 30.16 26.59 -33.73 -3,620.35 -1,318.34 9.625 607.52 165.42 469.15 Pass-Major Risk 11,100.00 9,032.87 10,300.00 8,872.15 30.19 27.89 -31.12 -3,662.31 -1,377.17 9.625 561.00 174.34 407.71 Pass-Major Risk 11,136.81 9,033.04 10,400.00 8,941.05 30.24 28.72 -28.91 -3,704.55 -1,436.06 9.625 525.01 181.67 357.42 Pass-Major Risk 11,175.00 9,032.95 10,500.00 8,998.56 30.31 28.76 -27.27 -3,750.80 -1,502.24 7.562 501.60 187.90 323.40 Pass-Major Risk 11,225.00 9,032.46 10,600.00 9,013.64 30.41 28.85 -31.48 -3,790.07 -1,591.77 7.562 507.55 195.81 320.00 Pass-Major Risk 11,275.00 9,031.90 10,700.00 9,020.61 30.54 28.97 -36.63 -3,841.42 -1,676.13 7.562 510.68 203.02 314.94 Pass-Major Risk 11,318.32 9,031.41 10,800.00 9,022.51 30.68 29.15 -41.55 -3,900.85 -1,755.94 7.562 514.52 208.64 312.47 Pass-Major Risk 11,575.00 9,031.31 10,900.00 9,023.92 31.69 29.38 -24.23 -3,948.50 -1,843.70 7.562 529.64 200.41 336.79 Pass-Major Risk 11,625.00 9,032.04 11,000.00 9,026.84 31.94 29.67 -29.95 -4,015.19 -1,917.78 7.562 504.64 208.93 302.74 Pass-Major Risk 11,668.74 9,032.82 11,100.00 9,019.60 32.19 30.02 -36.13 -4,092.50 -1,980.59 7.562 474.02 215.81 265.14 Pass-Major Risk 11,725.00 9,033.76 11,200.00 9,016.28 32.54 30.38 -43.38 -4,159.19 -2,054.85 7.562 488.81 223.49 252.31 Pass-Major Risk,CC,ES,SF 11,767.86 9,034.31 11,300.00 9,019.93 32.83 30.81 -48.15 -4,214.23 -2,138.15 7.562 488.40 228.52 266.53 Pass-Major Risk 11,812.27 9,034.73 11,400.00 9,018.48 33.15 31.28 -53.65 -4,259.41 -2,227.31 7.562 528.38 232.48 302.29 Pass-Major Risk 11,855.40 9,034.98 11,500.00 9,020.01 33.46 31.78 -58.65 -4,314.66 -2,310.32 7.562 565.78 235.08 336.75 Pass-Major Risk 12,009.64 9,035.46 11,600.00 9,025.65 34.56 32.36 -52.56 -4,385.80 -2,380.29 7.562 575.84 240.15 341.86 Pass-Major Risk 12,050.00 9,034.78 11,700.00 9,021.60 34.89 32.97 -57.64 -4,456.13 -2,450.91 7.562 593.92 242.86 357.05 Pass-Major Risk 14/02/2013 15:20:39 Page 4 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay ND Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset ND Reference: Offset Datum Offset Design PB F Pad- F-26-F-26-F-26 Offset site Error: 0.00 usft Survey Program: 38-GCT-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (use) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (usft) (usft) (usft) 10,09648 8,733.08 10,100.00 8,744.65 0.09 1.11 -73.64 -4,049.70 -477.73 10.937 54.78 9.52 45.47 Pass-Major Risk,CC 10,220.02 8,843.77 10,200.00 8,824.81 0.13 1.63 -88.72 -4,106.74 -495.68 10.937 55.72 13.27 46.38 Pass-Major Risk 10,310.72 8,922.39 10,300.00 8,904.41 0.15 2.13 -143.88 -4,164.65 -513.25 10.937 55.39 18.57 43.07 Pass-Major Risk,ES,SF • 10,370.47 8,966.44 10,400.00 8,984.03 0.17 2.61 178.02 -4,222.69 -530.34 10.937 110.59 21.18 92.55 Pass-Major Risk 10,412.74 8,991.10 10,500.00 9,063.64 0.20 3.10 163.54 -4,280.79 -547.26 10.937 188.25 22.66 167.31 Pass-Major Risk 10,466.14 9,014.23 10,600.00 9,143.13 0.29 3.64 151.56 -4,33908 -564.09 10.937 273.86 24.19 250.33 Pass-Major Risk 10,484.03 9,020.58 10,620.00 9,159.03 0.33 3.75 147.91 -4,350.74 -567.45 10.937 290.84 24.69 266.57 Pass-Major Risk 14/02/2013 15:2039 Page 5 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset TVD Reference: Offset Datum Offset Design PB F Pad- F-26-F-26A-F-26A Offset Site Error: 0.00 usft Survey Program: 38-GCT-MS,10345-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tooltace+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) )usft) (usft) (usft) (*) (usft) (usft) (usft) (usft) (usft) (usft) 10,096.48 8,733.08 10,100.00 8,744.65 0.09 1.11 -73.64 -4,049.70 -477.73 10.937 54.78 9.52 45.47 Pass-Major Risk,CC 10,220.02 8,843.77 10200.00 8,824.81 0.13 1.63 -88.72 -4,106.74 -495.68 10.937 55.72 13.27 46.38 Pass-Major Risk 10,240.00 8,861.81 12,200.00 9,019.36 0.13 18.47 143.08 -5,081.92 219.83 10.937 1,187.78 56.83 1,142.36 Pass-Major Risk 10,240.00 8,861.81 12,300.00 9,023.72 0.13 18.13 140.45 -5,104.54 317.13 10.937 1,263.51 61.86 1,213.74 Pass-Major Risk 10,240.00 8,861.81 12,343.00 9,025.13 0.13 18.79 139.38 -5,113.02 359.26 10.937 1,296.26 63.85 1,244.90 Pass-Major Risk 10,260.00 8,879.57 12,000.00 9,01724 0.14 11.33 150.04 -5,030.57 26.69 10.937 1,043.73 41.95 1,014.64 Pass-Major Risk 10,260.00 8,879.57 12,100.00 9,015.66 0.14 14.45 146.94 -5,056.04 123.32 10.937 1,113.30 51.05 1,074.64 Pass-Major Risk 10,270.74 8,888.94 11,900.00 9,02164 0.14 6.27 154.43 -5,017.98 -72.29 10.937 990.33 27.86 982.98 Pass-Major Risk 10,280.00 8,896.90 11,800.00 9,024.04 0.14 4.90 159.57 -5,024.32 -171.89 10.937 961.26 23.62 948.68 Pass-Major Risk 10,300.00 8,913.67 11,600.00 9,025.64 0.14 4.02 170.36 -5,022.54 -371.46 10.937 916.18 18.77 904.27 Pass-Major Risk 10,300.00 8,913.67 11,700.00 9,025.44 0.14 4.20 165.49 -5,028.84 -271.69 10.937 939.38 20.80 926.52 Pass-Major Risk 10,310.72 8,922.39 10,300.00 8,904.41 0.15 2.13 -143.88 -4,164.65 -513.25 10.937 55.39 18.57 43.07 Pass-Major Risk,ES,SF 10,320.00 8,929.78 11,500.00 9,028.32 0.15 3.94 176.16 -5,007.27 -470.18 10.937 893.81 18.01 883.00 Pass-Major Risk 10,340.00 8,945.10 11,400.00 9,030.75 0.16 3.83 -178.15 -4,979.18 -586.07 10.937 868.16 17.04 858.13 Pass-Major Risk 10,371.28 8,966.97 10,400.00 8,976.83 0.17 2.27 -178.30 -4,227.96 -538.75 10.937 115.53 11.57 106.72 Pass-Major Risk 10,420.81 8,995.10 10,500.00 9,019.19 0.21 2.34 -177.79 -4,302.48 -588.57 10.937 198.84 11.23 189.34 Pass-Major Risk 10,547.35 9,037.13 10,600.00 9,022.13 0.53 2.50 175.85 -4,378.23 -652.91 10.937 271.48 13.68 257.84 Pass-Major Risk 10,560.00 9,039.37 11,300.00 9,026.46 0.58 3.77 178.48 -4,940.51 -858.09 10.937 831.18 16.09 816.77 Pass-Major Risk 10,585.51 9,042.83 10,700.00 9,021.42 0.69 2.66 -175.76 -4,444.18 -727.88 10.937 333.64 14.20 319.56 Pass-Major Risk 10,587.99 9,043.09 11,200.00 9,025.01 0.70 3.77 -177.61 -4,884.75 -740.88 10.937 773.88 15.38 759.65 Pass-Major Risk 10,600.00 9,044.16 11,100.00 9,023.10 0.76 3.71 -174.63 -4,808.16 -804.26 10.937 700.97 14.85 686.81 Pass-Major Risk 10,610.67 9,044.85 10,800.00 9,023.21 0.81 2.90 -171.35 -4,522.50 -789.51 10.937 415.29 14.59 400.98 Pass-Major Risk 10,620.00 9,045.23 10,900.00 9,024.17 0.85 3.21 -170.07 -4,615.00 -826.88 10.937 511.43 14.64 497.23 Pass-Major Risk 10,620.00 9,045.23 11,00000 9,025.10 0.85 3.52 -170.56 -4,713.87 -835.77 10.937 610.51 14.52 596.63 Pass-Major Risk 14/02/2013 15:20:39 Page 6 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset TVD Reference: Offset Datum Offset Design PB F Pad- F-26-F-26B-F-26B Offset Site Error: 0.00 usft Survey Program: 38-GCT-MS.9875-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) 11 (usft) (usft) (usft) (usft) (usft) (usft) 10,045.93 8,692.56 11,100.00 9,039.59 0.00 2.69 34.13 -3,411.70 108.69 10.937 893.97 8.49 887.33 Pass-Major Risk 10,084.64 8,72321 11,000.00 9,044.97 0.02 2.20 34.56 -3,490.94 48.03 10.937 804.53 7.87 798.63 Pass-Major Risk 10,098.22 8,734.55 10,100.00 8,737.43 0.02 0.03 54.83 -4,057.12 -416.28 10.937 11.12 1.68 9.44 Pass-Major Risk,CC,ES,SF 10,13076 8,762.75 10,900.00 9,049.44 0.03 1.71 37.32 -3,578.88 1.31 10.937 717.12 7.47 711.94 Pass-Major Risk 10,171.00 8,798.99 10,800.00 9,050.35 0.05 1.30 41.37 -3,670.50 -38.42 10.937 630.40 6.95 625.77 Pass-Major Risk 10172.56 8,800.41 10,200.00 8,827.99 0.05 0.10 50.08 -4,054.82 -377.76 10.937 72.49 2.77 69.84 Pass-Major Risk 10,208.62 8,833.38 10,700.00 9,053.89 0.06 0.89 44.68 -3,752.89 -94.59 10.937 541.61 6.06 537.61 Pass-Major Risk 10,224.52 8,847.85 10,300.00 8,911.95 0.06 0.11 46.83 -4,012.86 -343.99 10.937 155.06 3.61 151.77 Pass-Major Risk 10,236.82 8,858.96 10,600.00 9,044.95 0.06 0.50 46.53 -3,824.27 -163.74 10.937 44741 4.99 444.00 Pass-Major Risk 10,251.59 8,872.15 10,500.00 9,018.46 0.07 027 47.00 -3,889.35 -234.66 10.937 349.00 4.50 345.25 Pass-Major Risk 10,253.75 8,874.06 10,400.00 8,978.80 0.07 0.14 47.18 -3,954.70 -298.66 10.937 249.34 4.14 24572 Pass-Major Risk 14/02/2013 15:20:39 Page 7 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay ND Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Site Error: 0.O0usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset ND Reference: Offset Datum Offset Design PB F Pad- F-26-F-26B-Plan#3 Offset Site Error: 0.00 usft Survey Program: 38-GCT-MS.9875-MWD,9907-M1ND Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NiS +Ei-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (usft) (usft) (usft) 10,099.10 8,735.30 10,100.00 8,739.04 0.06 0.06 -84.99 -4,060.98 -462.48 10.937 37.32 3.23 34.10 Pass-Major Risk,CC,ES,SF 10,208.09 8,832.90 10,200.00 8,816.98 0.10 0.13 -115.80 -4,122.68 -473.32 10.937 40.41 4.67 36.00 Pass-Major Risk 10,288.60 8,904.19 10,300.00 8,894.95 0.12 0.24 -168.70 -4,184.34 -484.24 10.937 66.24 5.71 61.18 Pass-Major Risk 10,340.00 8,945.10 10,400.00 8,972.95 0.14 0.38 171.35 -4,245.94 -495.24 10.937 131.86 6.48 126.06 Pass-Major Risk 10,380.00 8,972.52 10,500.00 9,050.98 0.17 0.55 162.20 -4,307.49 -506.31 10.937 212.12 7.02 205.59 Pass-Major Risk 10,409.64 8,989.50 10,600.00 9,129.05 020 0.75 156.95 -4,368.99 -517.47 10.937 298.62 7.60 291.55 Pass-Major Risk 10,432.32 9,000.40 10,700.00 9,207.14 0.23 0.98 153.27 -4,430.43 -528.70 10.937 388.96 8.15 381.40 Pass-Major Risk 10,530.00 9,033.52 10,800.00 9,285.27 0.47 1.24 136.43 -4,491.82 -540.01 10.937 477.89 10.42 467.77 Pass-Major Risk 10,540.00 9,035.88 10,900.00 9,363.42 0.50 1.52 135.20 -4,553.15 -551.39 10937 567.02 10.72 556.56 Pass-Major Risk 10,560.00 9,039.37 11,000.00 9,441,61 0.58 1.84 136.53 -4,614.44 -562.85 10.937 658.74 11.05 648.05 Pass-Major Risk 10,560.00 9,039.37 11,100.00 9,519.83 0.58 2.18 134.97 -4,875.67 -574.39 10.937 751.99 11.59 740.98 Pass-Major Risk 10,560.00 9,039.37 11,200.00 9,598.07 0.58 2.55 133.75 -4,736.84 -586.01 10.937 846.76 12.17 835.40 Pass-Major Risk 10,580.00 9,042.20 11,300.00 9,678.35 0.67 2.94 136.34 -4,797.96 -597.71 10.937 942.29 12.22 931.07 Pass-Major Risk 10,580.00 9,042.20 11,400.00 9,754.66 0.67 3.35 135.56 -4,859.03 -609.48 10.937 1,038.41 12.74 1,028.90 Pass-Major Risk 10,580.00 9,042.20 11,500.00 9,833.00 0.67 3.79 134.91 -4,920.04 -621.33 10.937 1,135.17 13.28 1,123.37 Pass-Major Risk 10,580.00 9,042.20 11,600.00 9,911.36 0.67 4.25 134.36 -4,981.00 -633.26 10.937 1,232.43 13.84 1,220.32 Pass-Major Risk 10,580.00 9,042.20 11,700.00 9,989.76 0.87 4.72 133.89 -5,041.91 -645.27 10.937 1,330.07 14.41 1,317.84 Pass-Major Risk 14/02/2013 15:20:39 Page 8 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay ND Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset ND Reference: Offset Datum Offset Design PB F Pad- F-40-F-40-F-40 Offset Site Error: 0.00 usft Survey Program: 92-GCT-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (usft) (usft) (usft) 11,711.56 9,033.56 10,000.00 8,543.22 32.46 31.64 -61.63 -3,525.85 -2,596.07 10.937 1,390.85 226.07 1,189.78 Pass-Major Risk 11,725.00 9,033.76 10,100.00 8,617.15 32.54 32,14 -60.48 -3,577.86 -2,638.85 10.937 1,357.48 228.78 1,149.96 Pass-Major Risk 11,750.00 9,034.10 10,200.00 8,692.33 32.71 32.58 -60.49 -3,629.02 -2,680.44 10.937 1,329.23 232.10 1,114.29 Pass-Major Risk 11,775.00 9,034.39 10,300.00 8,767.25 3288 33.11 -60.38 -3,681.18 -2,72125 10.937 1,306.06 235.34 1,084.13 Pass-Major Risk 11,785.00 9,034.49 10,400.00 8,841.08 32.95 33.67 -58.43 -3,73522 -2,761.61 10.937 1,287.71 237.57 1,060.76 Pass-Major Risk 11,800.00 9,034.63 10,500.00 8,913.95 33.06 34.21 -57.04 -3,792.01 -2,799.86 10.937 1,272.85 239.90 1,041.14 Pass-Major Risk 11,825.00 9,034.82 10,600.00 8,985.13 33.24 34.83 -56.84 -3,851.47 -2,83725 10.937 1,262.48 24265 1,025.92 Pass-Major Risk 11,988.26 9,035.58 10,700.00 9,055.25 34.38 35.49 -4924 -3,911.87 -2,875.13 10.937 1,258.55 248.12 1,016.88 Pass-Major Risk 12,000.00 9,035.53 10,800.00 9,124.32 34.48 36.17 -47.45 -3,973.09 -2,913.61 10.937 1,253.45 250.65 1,008.62 Pass-Major Risk,CC 12,025.00 9,03527 10,900.00 9,193.37 34.68 36.85 -47.23 -4,034.33 -2,952.10 10.937 1,255.01 253.49 1,007.19 Pass-Major Risk,ES,SF 12,025.00 9,035.27 10,920.24 9,207.35 34.68 36.99 -46.58 -4,046.73 -2,959.89 10.937 1,256.24 253.91 1,008.13 Pass-Major Risk 14/02/2013 15:20:39 Page 9 of 15 COMPASS 5000.1 Build 61 • BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset TVD Reference: Offset Datum Offset Design PB F Pad- F-44-F-44-F-44 Offset Site Error: 0.00 usft Survey Program: 66-GCT-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (% (usft) (usft) )usft) (usft) (usft) (usft) 10,460.00 9,011.89 9,852.00 9,173.56 29.90 25.42 11.78 -2,925.14 -471.73 10.937 1,194.99 152.70 1,052.69 Pass-Major Risk,CC,ES,SF 14/02/2013 15:20:39 Page 10 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset TVD Reference: Offset Datum Offset Design PB F Pad- F-44-F-44A-F-44A Offset Site Error: 0.00 usft Survey Program: 63-GCT-MS,8616-MWD+IFR+MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°l (usft) (usft) (usft) (usft) (usft) (usft) 10,725.00 9,041.23 9,800.00 9,028.95 29.93 20.14 1.37 -2,795.87 -794.29 10.937 1,301.80 145.09 1,172.63 Pass-Major Risk 10,739.67 9,040.44 9,900.00 9,051.85 29.93 20.18 0.74 -2,848.06 -876.05 10.937 1,247.75 145.89 1,116.62 Pass-Major Risk 10,762.05 9,039.25 10,000.00 9,05208 29.93 2022 -1.84 -2,909.85 -954.19 10.937 1,187.86 147.13 1,054.95 Pass-Major Risk 10,775.00 9,038.57 10,100.00 9,041.49 29.94 20.25 -3.80 -2,991.04 -1,011.06 10.937 1,110.56 147.90 976.81 Pass-Major Risk 10,800.00 9,037.26 10,200.00 9,038.34 29.94 2029 -6.99 -3,085.08 -1,04331 10.937 1,020.21 149.48 884.40 Pass-Major Risk 10,800.00 9,037.26 10,300.00 9,038.42 29.94 20.35 -6.88 -3,18426 -1,054.73 10.937 923.02 149.43 787.06 Pass-Major Risk 10,800.00 9,037.26 10,400.00 9,038.25 29.94 20.40 -6.83 -3,284.00 -1,048.12 10.937 82328 149.33 68726 Pass-Major Risk 10,800.00 9,037.26 10,500.00 9,038.96 29.94 20.48 -6.70 -3,383.63 -1,039.61 10.937 723.45 149.24 587.32 Pass-Major Risk 10,807.17 9,036.89 10,600.00 9,039.89 29.95 20.56 -7.41 -3,483.23 -1,030.81 10.937 623.57 149.69 48664 Pass-Major Risk 10,809.01 9,036.79 10,700.00 9,040.75 29.95 2065 -7.40 -3.582.70 -1,02060 10.937 523.69 156.33 386.38 Pass-Major Risk 10,809.39 9,036.77 10,722.00 9,040.77 29.95 20.67 -7.40 -3,604.56 -1,018.18 10.937 501.70 162.29 364.31 Pass-Major Risk,CC,ES,SF 14/02/2013 15:20:39 Page 11 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset TVD Reference: Offset Datum Offset Design PB F Pad- F-44-F-44A-F-44A wp11 Offset Site Error: 0.00 usft Survey Program: 63-GCT-MS,8602-MWD+IFR+MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft ' Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (usft) (usft) (usft) (usft) 10,725.00 9,041.23 9,800.00 9,025.97 29.93 20.24 1.26 -2,789.24 -802.02 8.375 1,308.07 145.31 1,178.66 Pass-Major Risk 10,750.00 9,039.89 9,900.00 9,046.18 29.93 20.30 -0.81 -2,841.40 -884,56 8.375 1,254.47 146.69 1,122.52 Pass-Major Risk • 10,765.11 9,039.09 10,000.00 9,047.03 29.93 20.33 -2.45 -2,900.29 -965.11 8.375 1,197.89 147.61 1,064.50 Pass-Major Risk 10,785.15 9,038.03 10,100.00 9,048.26 29.94 20.34 -4.81 -2,977.32 -1,028.42 8.375 1,125.79 148.85 990.83 Pass-Major Risk 10,800.00 9,037.26 10,200.00 9,044.90 29.94 20.37 -6.56 -3,068.11 -1,069.65 8.375 1,040.17 149.93 903.58 Pass-Major Risk • 10,810.45 9,036.72 10,300.00 9,043.06 29.95 2041 -7.84 -3,166.46 -1,085.97 8.375 945.00 150.68 807.38 Pass-Major Risk 10,812.97 9,038.59 10,400.00 9,040.87 29.95 20.47 -8.20 -3,26597 -1,078.05 8.375 845.42 150.79 707.58 Pass-Major Risk 10,813.89 9,036.54 10,500.00 9,038.82 29.95 20.57 -8.40 -3,365.09 -1,064.97 8.375 745.45 150.77 607.58 Pass-Major Risk 10,814.97 9,036.49 10,600.00 9,036.37 29.95 20.69 -8.65 -3,46420 -1,051.88 8.375 845.50 150.77 507.59 Pass-Major Risk 10,816.26 9,036.42 10,700.00 9,034.12 29.95 20.82 -8.96 -3,563.32 -1,038.80 8.375 545.55 150.79 407.62 Pass-Major Risk 10,816.86 9,036.39 10,741.03 9,033.20 29.95 20.88 -9.12 -3,603.98 -1,033.43 8.375 504.55 150.80 366.61 Pass-Major Risk,CC,ES,SF • • 14/02/2013 15:20:39 Page 12 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset TVD Reference: Offset Datum Offset Design PB G Pad- G-12-G-12-G-12 Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (usft) (usft) (usft) 10,120.00 8,75329 10,500.00 9,063.98 29.83 218.78 66.18 -3,597.99 845.81 10.937 1,392.54 670.06 923.63 Pass-Major Risk 10,140.00 8,770.97 10,600.00 9,143.23 29.84 222.58 64.18 -3,575.92 788.96 10.937 1,368.74 690.75 881.30 Pass-Major Risk 10,160.00 8,788.98 10,700.00 9,221.95 29.85 226.46 62.24 -3,553.36 731.56 10.937 1,350.62 711.53 842.87 Pass-Major Risk 10,172.89 8,800.71 10,748.00 9,259.73 29.85 228.33 61.53 -3,542.52 704.01 10.937 1,344.09 72328 827.76 Pass-Major Risk,CC,ES,SF 14/02/2013 15:20:39 Page 13 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71 usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Site Error: 0.O0usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.O0usft Output errors are at 1.00 sigma Reference Wellbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset TVD Reference: Offset Datum Offset Design PB G Pad- G-12-G-12A-G-12A Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO,10230-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth •NIS *El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (usft) (usft) (usft) 10,100.00 8,736.06 10,400.00 8,946.19 29.83 208.31 68.92 -3,635.42 863.86 10.937 1,374.94 637.89 938.42 Pass-Major Risk 10,120.00 8,75329 10,500.00 8,982.23 2283 20822 6275 -3,66124 77527 12937 1,290.13 64671 858.10 Pass-Major Risk 10,129.37 8,761.52 10,600.00 9,004.18 29.84 208.34 70.40 -3,731.99 710.33 12937 1,212.21 651.20 794.76 Pass-Major Risk 10,140.00 8,770.97 10,700.00 9,00726 2924 20824 74.40 -3,827.49 682.74 10.937 1,16261 65628 77271 Pass-Major Risk,ES,SF 10,160.00 8,788.98 10,800.00 9,011.21 29.85 208.34 79.63 -3,92627 675.00 12937 1,137.90 665.90 802.12 Pass-Major Risk,CC 10,160.00 8,788.98 10,900.00 9,02624 2285 20823 83.94 -4,02326 696.73 10.937 1,152.31 66527 85278 Pass-Major Risk 10,171.18 8,799.15 11,00200 9,032.73 2925 20823 88.68 -4,113.03 73922 10.937 1,193.14 67270 93251 Pass-Major Risk 10,180.00 8,80720 11,100.00 9,042.83 29.85 20824 92.43 -4,19127 80024 10237 1,258.82 674.45 1,03325 Pass-Major Risk 10,180.00 8,80720 11,200.00 9,042.73 29.85 20825 9221 -4,260.30 87229 10237 1,335.93 673.31 1,12822 Pass-Major Risk 14/02/2013 15:20:39 Page 14 of 15 COMPASS 5000.1 Build 61 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-26-Slot 26 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Reference Site: PB F Pad MD Reference: ORIG KELLY BUSHING @ 67.71usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: F-26 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wel lbore F-26C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-26C Plan 1 Offset ND Reference: Offset Datum Reference Depths are relative to ORIG KELLY BUSHING©67.71usft Coordinates are relative to F-26-Slot 26 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.00 W° Grid Convergence at Surface is 1.17° Ladder Plot 1400- I I I 1 1 I` C I I I I I H 1050- 0 co in C J J _ _J O co N °' 1 ''''', \II.....vi � 700- I I I I N C a l J J O N T I I I I 350- 1 U � I I 1 ■ I I LECitllvD i 0 2000 4000 6000 8000 10000 12000 F-02,F-02,F-02 V3 -e- 1 l d,Pe pt 2000 USf.^.' F-45,F-45,F-45 V4 -4-- F-02,F-02A,F-02A V4 F-19,F-19A,F-19AV0 X- F-45,F-45A,F-45AV2 -tr. F-03,F-03,F-03 V1 -B- F-26,F-26,F-26 V3 -4a- F-45,F-45B,F-45B V0 4E- F-03,F-03A,F-03A V8 -I- F-26,F-26A,F-26A V1 F-45,F-45BPB1,F-45BPB1 VO -Xf F-04,F-04,F-04 V8 4E- F-26,F-26B,F-26B V3 ±v F-46,F-46,F-46 V3 $ F-04,F-04A,F-04A V22 F-26,F-26B,Plan#3 V6 F-46,F-46A,F-46A V3 -e- F-04,F-04AP B1,F-04AP B1 V8 -0- F-27,F-27,F-27 V3 F-46,F-46A,Plan#5 V2 -- F-04,F-04B,F-04B VO $ F-27,F-27A,F-27A V4 F-47,F-47,F-47 V3 -6- F-15,F-15,F-15 V5 F-27,F-27B,F-27B VO -0- F-47,F-47A,F-47A V1 $ F-15,F-15A,F-15A V3 -0- F-28,F-28,F-28 V1 $ F-47,F-47B,F-47B V0 F-15,F-15A,Plan#1(+500)V2 F-28,F-28A,F-28A V2 G-12,G-12,G-12 V1 -- F-16,F-16,F-16V1 F-28,F-28B,F-28BV0 -- G-12,G-12A,G-12AV1 - I--16A,I--16A,I--16A V1 , - -:,-an •t = , - 2, G• 14/02/2013 15:20:39 Page 15 of 15 COMPASS 5000.1 Build 61 0. CO 1 CO t Q 0 J Q Ce CD I CO 0) .o L •_ a) ER M Q 14 N n. o V •■ N m o O r -0 t c a N � V s ' U .0 O 3 � c � a LL Za` a a CO LA N a 1 _ _ z m co N 0 0 °° V . ° 0• u IV O_ _ N z z r' v o co N N 0 ? r r a 0 n I z 0 m o a © ) 0 c .- 00 0 a° m z_ z a N D D N 1 W O p m m 07 N N w U O >- >- 3 < ° M -ai I -J -I 0 J — 'O (ID 111 ill N Y Y U) Orn ei d LL O0 y ,E c m y iii O O w m C 9 > > a a c 2' J y J 0 0i > a c 0 hi ° U N a'', O E t J J 0 L Lo a' ` S o y c d• z — .a V U N 3 3 �, m O N C t7 j0 = v LL ° O d w U 0 w w 0 w E o 0 0 L N N- CC m O 0) K > I� O L L L N w w J 2 U O U N O O O 01 7 0 O N N CD N. 0 n . N CD N. 0) O co m 0. r N 01 ID c U) Q CO C. G. a r CO � 0 o c 3 - ° a O a, W 3 0 m w >N 3 y N O On c . 190 W N ,J i c 6, A y C 01 O O 0i L L •� 2 W U) r O N N E P_. w z w 3 'u I a ui E o O O H + `o0 O 0 a a C r ° Q 1 01 N CO O 1`7 W d 0> O a w o o E a E a' U) Q w N a w co r r LL co (7 (o w w w L a CO N Z N 3 3 3 G m a X Q ''', L LL 0 0 O y O W 0 7 O O O 0 > N O O O CO N 0 ~ ° N 1, N 10 a, rn U m ° �) E a 0 Q m m UZ 0 m-0 (O z a C CO N N Z. m N a o a LL IL 0 u. d m 0 N m O E 5, o a U m g v) 3 o m 4. p 7 m N N N D Z Q ro 2 1� Z a a u. IL LL 1CQQ tCQQ a L L C .p- 01 C d G R T d j w C r C Ci .... N 0) m 7 •w C c C co C- d d OI y N 0 to N d w �,I 1 2 1 0 C OI ? C V O p .Q ad+ d d y .p A d m ,°t! .d+ O •g d N .O 1 d co d d d 1(V C.) 0- 0 1:) a 2 0 2 U) 'v) LLa 3 3 a 3 a 0 a > > N O 0 0 CO C) N 0 0 0 N. 0 CO 0 0 m 0 0 0 0 e- CO O 0 O V CO N 0 0 0 N 0 N. 0 0 N 0) N 0 0 0) -O O O O co O U) O O O V O N- O O O O O O O) V V C) m V r In W U m O) O) m CO O) CO '3 r CO r r s- 0 w o 0 U E a 0 (C (Y Z Z CO N N W N (0 .- 0) Cr Cr CO N CO u) CO 0 U) 0) V 0) CO 3 3 d O r- co ,— N CO C) CO V 0 W CO .-- CO V V CO (() 0) V V O U) O V O) V W W O m W O u N U C O W 0 N. ^ co co N CO CO O V N- co co co co W co co C) CO m N N. 0 V n in m N CO CO 0 0 0 - - m m 0 p y 7 9 0 > z z (z x x CC a co p m m N O O O O O O 0 0 0 0 0 0 0 O 0 0 0 0 O 0 } } Q 0 o 0 0 0 0 0 0 o 0 0 o 0 0 0 0 0 0 0 0 J J O O) V V V V V V V V V V N N N N N N N N W l U i N N N N N N N N N N r r r N l Y 0 Y Y 3 x y o w OO H2 w L. N V U) U) CO CO V C) M CO 0) N N V O) M V CO W O N C) V W N m O V W W C) W 0 a (h m N- U) f� N N. m M 6 V U) V u) m O (- n m m O Q) U) GI O) O O O) u) N CO U) 0) O m CO M 0) 0) 0 N. O 0 N U 'O a l N C) C) N N N O O m O) CO CO N. N m m m (() C O C N N N N N N N [Si N N L - m' u) U) U) U) U) U) N N N U) 41 O O CO U) U) U) O CO U) d y fa CO m m W m CO O W W m m CO m CO W CO CO CO m m W E W re c W d O c ti W u m '6 2 C O V C) U O) C) N. Cl. O) N. C) 0 0 0) h 0 0) CO V C) n C) C) CO x- O V O U CO N V N U) N. m N. V U) m CO En � U N U N. V W m u) O) N m O m .— N O V O C O w Ili W U 7 M N 0 CO V V U) U) U) N Cl. U) U) CO N C) N x- W m O W a' >. co E rn CO m CO U) (n U) (n (n (n (n U) u) (n U) U, (n (n 0 V v L W a C co- O) O) m 0) m O) O) W W O) O) O) O) O) m O) O) O) O) F L '.- W m m CO CO m m W O m m m m m m m m m m CD❑ o e a 0 U ., 2 m m CO O) 0 O a) O) m O) m CO O) O) CO 0) 0) 0) 0)CO> ❑ (a J F 2 2 CO ❑ 0 u O U N N U N U) U) U U U U U U U U U N U O 0 o C t C t O N N 0 d U) U) d G E . . co N CO 0) V V CO N O 1)] x- CO 0 LO m V W co U U 3 O O O 0 - N CO (7 CO Cr O CO m CO Cr Cr CO O O) Cr CL CO L V O U) h O V O) V m OD m m m 6 U) N O C) O O) W U CO CO N CO CO 0 V N. () m co co W co co co co co N N- 0) ❑ (n 2 2 v v v v v U) u) U) (o n N. n r (n 9' o O O =m " CO � I- 0 0 d CO O V CO CO V N. N. C] N. N CO N. N CO N. N 0 m O) 0 m 0 N. V Cr CO N (h N- CO C) CO U) C) N U) m N CO C] U] m N. W V N m O N. N N. W N N N. O 1 W W N V W 0 0 0 O 0 0 0 CO 0) N M Cr N N. ' t 0 0 0 c- s- x- .- .- .- .- s- x- .- 0 0 v v v v y w a z 2 F 0 E E Z O co U) O) CO 0) 0 W M .- U) N V N. O m 0) O 0 (7 h C) N. 0) M m m 0) CO V I- 0 m U) O C) 0) Ix-- CO O U m . O h m 01 O m ,— h N O) V C) N C V N C CO .n V N. 0) C) CO N. n h N. CO (0 CO CO CO CO (o CO CO (o N. CO CO 0) m 0 CD rn m CD rn rn rn rn rn rn m N H m m W W W W W W W W W 00 W W W W W W W W IL N ig ❑ 7 L (/1 I j C F CO N V CO V CO CO CO U) CO 0 m CO CO CO (O V Cr N N m N. V C) 0) ,- a- .- W 0) U O (O n n n N. N.U O N V V W O O O V 0 C) O) O) V N O N.: C) O)m co CO N. N CO CO CO CO CO O N. N N. N N W U) Cl. V U) U) 2 N � � � N N N N N N N N N N N N N N N N N O ;11„, u- CL 7 W 2 O Q .. C °. CO C N @ 3 O > L v a N m () a U > N Q N O O U) m m m V C) N � 0 CO N V V O CO J U) ,- LL N CO O W m W N V m CO (0 U) s- s- O) (- m O O O O N N01 N m 0) rn N m m m Q N O O Cr [) N V CO m n CO O) 0) 0)v U) O U] co U >. - ❑ CO V N. V CO C O g' 0 0 0 C 0 m m F rn O Q O d a L L U U -e 'O m CO CO O 2 co N N N E Z a a lL LL lL co O O O 8, 4 O O ▪ n V O O O O O O o O O O 0 O O 0 0 0 0 0 O 0 O O O O O O O O O O O O O O O O O O O 0 Cl- O CO CC O o o O O O O O O O O O O O O O U U O U a OD C) W V CO 0 0 0 V 0 CI 0 C) 0 C) CO 0 0 0 N U) 0 U)• O E ` O O N C) C) V Cr N N CO CO CO ci N. CO 0) 0) 0) 0 0 R N s- N O O O O O O O O O O O O ❑ O C d .. F LL -O (")0 a W V . .0 O) W 0 O N 0O W L ., W © y 3 U a l ❑ U) d N N ■ O M I)) 0 CO 0 Cr LO O CO O M N 0 CO O O CO 0 O) O 0 ,- 0 0 0 0 0) 00) N- CO) 00 1 a IA V V O O M M M N 0 n n O O O 1 '3 co co co a, O) M O) O) O) 0) co co co 0) O) co co ''.i m 0 U U m ° O o w ec LO O O Co Z z (n Q N N N In N 0 n ,- N- CO N M 00 co o N N 2 7 7 d N O V N V '— O 1D V 0 LO N V CO O M (O O O) O) N V M 0) N- N- V M M t0 co r n Z N N O) CO N- Ln O 4 0) N O) M LO CO .- In 0 N CO 01 01(D n Q u .- s- .- .- s- s- - (0 (D 0 s- N. CO CO CO W W (0 CD N e O O 0 > '- Z z CC I 2a N CO CO r h p m m @ m O O O O O C o o O O O O O O O O O (n >- >- � Q o 0 0 0 0 0 0 0 0 0 0 0 o o 0 0 0 J J 0 L N N N N N N N N N N N N N N N N N (1) N w E 0 Y ce rn o 3 w 0 0 E J > O O F2 w I. V N a V V CO LO LO O CO co LO LO co O) V 0) 0) co O) V V CO In LO CO CO N O Cr • 0) Ln N- m D Lri D D V ,c) O N O 0 O) _ co 0) co co M 0) V •- Cr 0) LO M CO u -a O) N V V M N N O O O 0) O) co m co N C _ _' _' _ d L •C i' LO LO LO LO LO N7 LO u) LO N In LOO to LOO t0 LO Ln O N iO ■ 0 (D CO CO t0 m (O (D (D CO CO 0 1D O 0 (D CO N E CO O O 0 C w O Lt) y O y Ln N u c m O D E .. ui �'= m'O y u 0 u O CO CO N t0 V N V N- V N (D V Cr 0) O r O (O .- 0) M N. O N N M t0 M I() O 0) O Di 0 w m 0i m a Li) V LO 0 V (. n (O W (O p O w 0 0 0 co M N N. CO O Cr N Cl (O Cr N. CO CO O V (J d a' T t00 O Cr V V CO M CO N N N a- O O 0) CO W CO 0: 0) L O) .0 C (A O) O) O) 0) 0) 0) 0) 01 co- co- 0) O) a0 m m co- 20 — m L r (D 0 m (D co co co m O t0 (D co (0 co co (D m LO N r\ p 0 W O) O) O) CO 0) O) CO CO 0 0) 0) O) CO O) O) 01 LO N a J r 2 Z 0) 0 0 •▪ 7•• (O LA Ln 10 I() LO (O LO L() LD LO N Ln LO (O LO 4) O) M co .E G ri Q) 1 E• O U p a N Ln n O (- N- CO N M CO CO O LO N p I N O Cl- N V 1- O (O cr CO LO Cr N- N- N V CO E M (0 O O) O) N V M V O) (.: r V M M CD m N N O) M N- LO O V 0) N O) co t0 O) .- Lc) 0) N M CO. CO V V LO 0 co co N N CO co co O) co I a U I >. a CO Cr CO LO (O N 0) (D (0 CO CO Ln v V [O CO N co (D to O) W co LO LO V h 0 (O 0 (� M V O N.: 0 N O) O n O V U) N- O O O N O) "a- m .- ,- N O V 0) N V N- 0) CO N LO O N CO 4) O) • N N N M M CO V V Cr V LO 0 CO N N N > 0 7 V V V V V V V V si 7 V V V 1" V V 0 2 a a a. m Q • E m m V OD e- O M O m N V (D N O V NCO i 11 z - O 0) O CO 0) 0) CO 0) O (0 CO M V CO CO CO LC) N V M M N N M M Ln Ln 0 h h h N. M (D O m OD (0 (D (0 CO CO O (D 0 O (0 0 CO (0 1 0 0) 0) CO 0) W 0) O) 0) O CO 0) O 0) 0) 0) O) tO W a0 W m M m 0 M O OD OD m m m M m 1 CO• 0 1 = I N- _ N N 0) m OD 0) 0) O O O O O O CO V 0 V OD N N- CO LO CO V CO CO (D V 0 I 0 _ V N O C) 0) N. N V O m O V N OD 0) 1 M Bo 1 IO V Cr CO N N V V V CO M N O LC) N N N N N N N N N N N N N N N NN M CO 'N c. a- Q Off) 4M) m N M mi a^. co M l em Ln j 0 ..N2.. N OD `Cr O N V N Cr O Ln O (O N V V 0) N 0 (O 0 (O M N CO 0) O N CO n 0 CO CO Q 0 O 0 0 0 0 Di Oi 0i 0) Di Di 0 0) 0) 0 1 co 0) 0) 0) O) 0) OJ CO OD CO CO CO CO CO CO CO 0) 3 T _ O O 1 • m 0 C 0- ,,. -. O O a, CO _ M OD E O m a D 0.S-' (D CO L a U U 0 7 N am O ? CO N N N 2 p Z 0_ a. a LL a O O O O O O O O O O co 0 O O O O O 2 D Q D C C D C C D D O O O O 0 O O T O O L) O N O O N O Il O O LO O N O N V N o O O Cu) O o N o (D 0 O (D O (D Oh- N T ` N N CO M V LO L1) (D CO I� CO CO O) 0) O O C m M T fn p -_ - — .- ,- — — ,- ,- — ,- .- - — — — N N •O V (V c .. m .. 2 3, a o) Y a ° . a a c c o C N E .o _ _ .y E L O a rn 3 o a qs 0 0 N cv TREE= 4"FMC WELLHEAD= McEVOY S NOTES: ACTUATOR= BAKER ,F_2 6 g KB.ELEV= 67.7' BF.ELEV= 38.61 KOP= 3091' Max Angle= 93 @ 10744' 2112' 1H4-1/2"OTIS SSSV NIP,ID=3.813" I Datum MD= 10246' • Datum TVD= 8800'SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3092 3023 10 CAMCO DMY RK 0 06/04/08 13-3/8"CSG,68#, L-80,ID=12.415' -I 2683' I 4 5861 5319 39 CAMCO DMY RK 0 06/04/08 3 8149 7132 35 MACCO DMY RK 0 09/23/02 2 9304 8049 39 MACCO DMY RK 0 09/23/02 Minimum ID = 2.372" @ 10704' 1 9445 8158 40 MACCO DMY RK 0 09/23/02 TOP OF 2-7/8" LINER I I 9473' 1-14-1/2"OTIS X NIP,ID=3.813" I 9480' HOTIS TBG SEAL ASSY 0 9497' I-I 9-5/8"X 4-1/2"OTIS PKR,ID=3.85" I ' 9550' 1-14-1/2"OTIS X NIP,ID=3.813" I • 9566' H 3-3/4"BKR DEPLOYMENT SLEEVE,ID=3.00" I 1,---H 9571' H4-1/2"OTIS XN NIP, ID=3.725"(BEHIND CT LNR) I N/A -f ELMD TT LOGGED(BEHIND CT LNR) I 9583' H 5-1/2"TIE BACK I 4-1/2"TBG, 12.6#,L-80, .0152 bpf,ID=3.958" 9587' I ♦1 IFH 9585' I-13-1/2"HES X NIP,ID=2.813" • 3-1/2"LNR,9.3#,L-80, .0086 bpf,ID=2.972" 9587' 9586' -I3-1/2"X 3-3/16"XO,ID=2.805" 44 I ? H FISH-KB PKR ELEMENT&SLIPS(06/03/08) I 9-5/8"CSG,47#,L-80 NSCC,ID=8.681" H 9838' ■ PERFORATION SUMMARY MILLOUT WINDOW 9876'-9882' REF LOG: SWS MEM CNL ON 06/23/03 ' ANGLE AT TOP PERF: 93 @ 10800' Note: Refer to Production DB for historical perf data I 9875' I-I TOP OF WHIPSTOCK SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10544-10569 0 06/12/07 2" 6 10694-10719 0 06/11/07 L 10685' I-13-3/16"X 2-7/8"XO, ID=2.440" I 2" 6 10719-10744 0 06/11/07 2" 4 10800-10980 0 06/24/03 2" 4 11180-11440 C 06/24/03 ∎♦t♦♦♦•♦ 11075' CTM -12-7/8"BKR CIBP(09/21/06)I 2" 4 11490-11630 C 06/24/03 ,►�'������0.** S .04 40004 ■ .�' 40441......1 .4 11639' JPBTD 5-1/2"LNR,7#,.0232 bpf,ID=4.892" 10620' 40400 10400. 00 10400 '.4b 00044 0000 AA. ■ 2-7/8"LNR,6.16#,L-80, .0058 bpf, ID=2.372" -I 12343' 3-3/16"LNR,6.2#,L-80, .0076 bpf,ID=2.805" -I 10685' I I2- LNR,6.16#,L-80, .0055 bpf,ID=2.372" I-I 11672' I DATE REV BY COMMENTS I DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/14/89 ORIGINAL COMPLETION 05/13/04 JAF/KAK�ADD KB LNR TOP PKR WELL: F-26B 10/04/98 HILDRETK CTD SIDETRACK(F-26A) 09/21/06 GLM/PAG SET BKR CIBP @ 11075' PERMIT No: 2031060 06/25/03 DAC/KK CTD SIDETRACK(F-26B) 06/26/08 KSB/PJC PULL KB LTP&GLV(06/04/08) API No: 50-029-21987-02 07/04/03 JJ/TLP GLV C/O 05/08/10 CR/SV ADD PERF(06/12/07) SEC 2,T11 N,R13E,2141.47'FSL&2196.96'FEL 07/12/03 CMO/TLP KB ELEVATION CORRECTION 09/20/03 CMO/TLP DATUM MD&PERF ANGLE 1 BP Exploration(Alaska) TREE= 4"FMC WELLHEAD= McEVOY F 2 6 C I S, (NOTES: ACTUATOR= BAKER KB.ELEV= 67.7' Proposed CTD Sidetrack BF. ELEV= 38.61 KOP= 3091' 2112' H4-1/2"OTIS SSSV NIP, ID=3813" Max Angle= 93 @ 10744' Datum MD= 10246' Datum TVD= 8800' SS GAS LIFT MANDRELS ST MDTVD D EV TYPE VLV LATCH PORT DATE 5 3 092 3023 10 CAMCO DMY RK 0 06/04/08 13-3/8"CSG,68#, L-80, ID=12.415" -4 2683' I 4 5861 5319 39 CAMCO DMY RK 0 06/04/08 3 8149 7132 35 MACCO DMY RK 0 09/23/02 2 9304 8049 39 MACCO DMY RK 0 09/23/02 Minimum ID = 2372" @ 10704' 1 9445 8158 40 _ MACCO DMY RK 0 09/23/02 TOP OF 2-7/8" LINER I I 9473' I+-1/2"OTIS X NIP ID=3.813" I I 9480' H OTISTBG SEAL ASSY I LTP set Post Rig 0E1 I 9497' 1-19-5/8"X 4-1/2"OTISPKR, ID=3.85" I TOL @ —9,520" MD 9550' H4-1/2"OTIS X NIP ID=3.813" 2-3/8" S-TL Ill 9566' IH 3-3/4"BKR DEPLOYMENISLEEVE, ID=3.00" I I 9571' H4-1/2"OTIS XNNIP, ID=3.725"(BEHIND C1LNR) I N/A —I ELMD TT IOGG®(BEHNDCT LNR) I \J 9583' H5-1/2"TIEBACK I 4-1/2"TBG, 12.6#, L-80, .0152 bpf, ID=3.958" 9587' 1 � _ 9585' I�3 1/2"HESX NIP, ID=2.813" • 3-1/2"LNR,9.3#, L-80, .0086 bpf, ID=2.972" H 9587' 9586' I-13-1/2"X 3-3/16"XO, ID=2.805" I 11 r ? H FISH-KB PKR ELEMEN&SLIP(06/03/08) I 9-5/8"CSG,47#,L-80 NSCC, ID=8.681" —I 9838' ■ MLLOUTWINDOW 9876'-9882' PERF02ATION SJMMARY 9875' H TOP OF WHPSTOCK I REF LOG: SWS MEM CNL ON 06/23/03 TD @ 12,075' MD ANGLE AT TOP PERF 93@ 10800' - TO at 10,250' MD Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE ____ 2" 6 10544- 10569 0 06/12/07 2" 6 10694- 10719 0 06/11/07 3-3/16"packer whipstock @ 10,040'MD 2" 6 10719- 10744 0 06/11/07 40 Degree inclination 2" 4 10800- 10980 0 06/24/03 10685' H 3-3/16"X 2-7/8"XO, ID=2.440" I 2" 4 11180- 11440 06/24/03 PATATATATA�����i 11075'CTM �2-7/8"BKRCIBP 09/21/06) I 2" 4 11490- 11630 06/24/03 ,1v���v���v���vg, , •••••••••1*...../1....1........ /I, 11639' PBTD 000004***.11.1 •�•�1.1�1�•�1�•.•�i��i I*Q•j•j•�Q•j•4 5-1/2"LNR,7#, .0232 bpf, ID=4.8921 1 10620' •00••••••,• 1�•�•�•�•�•�•�•• W� a MOO*. 2-7/8"LNR,6.16#,L-80, .0058 bpf, ID=2.372" H 12343' ILVAVAVAVAVAVWVAV WAWA 3-3/16"LNR,6.2#, L-80, .0076 bpf, ID=2.805" —I 10685' I 2-7/8"LNR,6.16#,L-80, .0055 bpf, ID=2.372" H 11672' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHCE BAY UNIT 12/14/89 ORIGINAL COMPLETION 05/13/04 JAF/KAK ADD KB LNR TOP PKR WELL: F-26B 10/04/98 HILDRETHCTD SIDETRACK(F-26A) 09/21/06 GLM/PAG SET BKRCIBP @11075' PERMIT No ZI31060 06/25/03 DAC/KK CTD SIDETRACK(F-26B) 06/26/08 KSB/PJC PULL KB LTP&GLV(06/04/08) API No:50-029-21987-02 07/04/03 JJ/TLP 3 LV C/O 05/08/10 CR/SV ADD PERF(06/12/07) SEC2,T11 N, R13E,2141.47'FSL&2196.96'FEL 07/12/03 CMOTLP KB ELEVATION CORRECTION 09/20/03 CMOTLP DATUM MD&PERF ANGLE BP Exploration(A laska) i a o Jj j.•i, •iiik UI m . 1 II �F'�f p O.iiiiikimp i 4:F• m .� lir t Iwow i sow ,r• 0 2 a 1 . Er r t E 0 CI U , m —� ' v O u ° z ° ■•LL ? s �Z t • g u ..mi .. - — m r au,,•x Q g _ _ "" 5 8 ('7 IX II � s; r °I I I m ill'•L- A W ?Y/• ••• ..Q 2 f $y u u u z a :Y t--, o z c•, y{j O i ' ° in u N i '- • K O 2 v I I,g H-d F r 2 1 I Z a • � i 5- •*Pit Y i a U = o a r ' z u. m � . ii a z d o =m J ¢. iU 4a - 114.1:: E .. 3 LI a. f1 , r m E f U s MI 1 U 1 I MI Illuz TRANSMITTAL LETTER CHECKLIST WELL NAME r`g(� PTD# l Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: ��c La(L POOL: ( _C�� / Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 F To co co 0 a) Q us co 2 o o m a) c a a) a) L C u) O m o O O a W L C a -o- w C t .D —CD CD m a) _ @ a .n o a) w o a) '3 co co c> O `+ a) L V @ 3 I— 0) a @ 'O @ w a) c 0 c N Q @ 0 °v ° a H a cT • co co U L "O p O 7.co LL J (/) u5 O co co c a) W - 0 ° a) a°) 2 ,'n °° O E a co a C w a) Q .- n cn N 0 D CL.J L O O E CO z 0000 O 2 Q O - o N U m .co m W L C co LL > C a) 0 0 N Co W O u) @ - ti o) O co 2 y N m w E @ co E 0 `m a c D c' o rt ~ CO m - 03 -°o Q O a ° ° N CC J LL N ° a. co i N Y a N C 'E. 2 = .O N mQ Q a) a) C o) 0) a8 0 ch > °- ° cn Z 0 Q C c0 7 3 a) E C C N @ @ 00 2 @ 0 '0 E 0 — W @ N @ @ a) M @ E N a N @ E a) 0 0 C O 0 0 cf) N > N co a) '0 a CO =z co p 0 c o U C. m Z E .E. LL E -° 0 E N D - M "O N L 'O X cn CO @ d Z c cK O @O_ 0 3 0 N o) D o ■m LL N �- x a w W a 0 o 0 cn U) m Q cn a 0 2 I IL W a a > in 0 Q < aa)) a) a) a) a) a) a) a) a) a) a) a) < Q < < < < < Cl)) a) a) a) a) < a) a) m a) a) a`)) < o a < < < Qz z > > > >- >- >- >- >- >- } >- >- z z z z z z z >- >- >- >- >- z >- >- >- >- >- >- z z > z z z T 1 o a) N v N @ @ T U w o c Ts a) a) •E E 3 - E a) O 0 U j C @ C N O o .- 0) V 7 0 _T > Q T n C Cl_ E C L O E o ° 0 a) c 0 ov a`a 3 E 3 ° co O a) M C ° O 0 C a) E J 0 O ` .0 CO 0 E (p ^ ti \ 0- Q @ @ O w m 2 @ O ° co a Lv c 7 C 7 CD Q k a a ° w °n' ° aci °)o co ovo w @ aNi CO �1, cc I o@ "= 't c E ° @ a T a`) E o 1 Q U ° C 3 a) (U T w '7a O O xS E N (6 '�' O co �° O 7 f2n N N `` C m z 0 = w m � L w @ O 3 co c co L c U) O Q 'n O < N ur N N a) .NN1 W 'O O E 'a O a) c @ 0 Q D 0 C a) m O a O a) n a- c c C a) c O a) 0 Q ``) E E = -°0 c c E m a) o c c in .> E- O m a) cc c m y rn a N c a c)c a Y < o 0 o t., a 0 CD w o 0 0 ° 0) 7 0 'n _ ° a) - o ai d g T 3 0 > 0 4 Y N 7) DQ o _o 0 a) a) E o T O 7 7 0 -° @ .(6 Y O 0 a) @ O (0 .� N Q (` N. "0, O 01 O N C N J N o E a c c ° r o o c a) - c n Z o E .Q S a o ar L f6 V 3 •En E a Q E m e -0 m a m n n 2 r s a@@ -=o aa) @ ` c m a co m 0 -,0_, a`°'i 0 a) O n 3 0 .o -° >, c E as Z z n a c 'm a a m 3 3 > a> .. ° 0 °v m o a a 3 ° 3 o CO 2 w0 o p ° 2 c a a 0 0 .Q ° ° o@ o o m o o c o o o a) @ o 0) c ° n m m LL F O -8 n@ a) N 8 @ C ( OL 7 7 Q C U Q O _ N O (E`0' E a1 O' L Cn O j' N C .) Q ° L n a) -° Q n 0 a) Q N N Q z V a) d @ d) @ `' N a) E C U •3 N �: 0) O N c L -a IY N U @ E @ O O @ a) ) Q N N @ ` .-0-C m 7 7 @ N as S] O. T "a, lc u) •.N O a cs) LL O ° @ 0 -a -° 0 .N c m -0 -0 -° -o L ) in 7) a) a) > rn m CO a) a w 0 ° 0 ° 0 a. c. c E X -a -a 0 •'N _ 3 c m LL a) w E 3 is is m@ a°i o L@ m E o 3 ° o o @ @ 0 0 m _ a° a) @ ° , 0 (cp o) m 0 c /y/� F' W c C @ U U U N @ O O 0 ° 5 U fci o U a) o o — -0 @ o Cl)@ qj Q E ' a) c U' a) ° -a N LL o :- ° 0 0 0 0 .a .> is m n o m Q 0 U > > 3 m c Cr `) 0 a) c w w a) 3 0 r °- .E a) ° ai --.co Y m o aE) 2 .2)- E a) Cl) Cl) = -0a n n a) 5 co 0 3 m o = 2 2 0 -oo @ -@o `o 0 0 c 0 N a a`) m, 'a a> o U C z LL J D CO w O O LL LL 0 Q a. U cn U U U U Q w Q ' a m m U - M a.; 0 cn cn 0 , @ M I E - 0 N M V In (D CO O O N M N (N O � 00 O O N M V C') O r CO CA E � � N CO V (n a0 N- 00 0) r• r .- � � � � � � N N N N N N N N N N M M M M M M M M M M IC U M M M G O C w 0 w N w N U 0 0 O O 00 N co Q. O as M co co ° E co E (1j11 0 E C) pLL C Q j 0 4 I 0 L.Li