Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout213-0507. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU E-01B
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
213-050
50-029-20166-02-00
11350
Surface
Intermediate
Liner
Liner
Liner
9049
2670
8744
1037
884
2461
10090
13-3/8"
11-3/4" x 9-5/8"
7"
3-1/2" x 3-1/4"
2-3/8"
9051
28 - 2698
27 - 8771
8218 - 9255
8944 - 9828
8889 - 11350
28 - 2698
27 - 8287
7786 - 8727
8443 - 9049
8394 - 9049
11200
2670
4760
7020
10530
11780
10090, 10340, 10500,
10700, 10845, 11200
4930
6870
8160
10160
11200
9855 - 11296
7" 29# N-80 26 - 8256
9050 - 9048
Conductor 75 20" 29 - 104 29 - 104 1530 520
No Packer
None
None
Torin Roschinger
Operations Manager
Kirsty Glasheen
Kirsty.glasheen@hilcorp.com
907.564.5278
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028299, 0028304
26 - 7820
N/A
N/A
36
112
19121
6432
6
24
0
0
700
180
N/A
13b. Pools active after work:PRUDHOE OIL
No SSSV Installed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 1:18 pm, Jan 04, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2024.01.04 06:02:16 -09'00'
Torin
Roschinger
(4662)
RBDMS JSB 011124
WCB 2024-06-24 DSR-1/26/24
ACTIVITY DATE SUMMARY
12/8/2023
LRS CTU #1, 1.5" Blue Coil. Job Objective: Set CIBP, Adperf
MIRU & RIH wtih 1-11/16" HES GR/CCL logging toolstring with bowspring centralizer
(1.75" max od). Tag at 10222' and unable to pass. Log up at 50 FPM to 8800'. Paint
tie-in flag at 10040'. POOH and confirm good data (-25' correction). MU 2-3/8" NS
CIBP with bowpsring centralizer.
***Job in Progress***
12/9/2023
LRS CTU #1, 1.50" Blue Coil. Job Objective: Set CIBP, Adperf
RIH and set 2-3/8" NS CIBP with bowspring centralizer at 10,090'. RIH w/ 1.69" x 30'
Geo Razor Perf Gun #1. Tag CIBP & correct depth. Puh & Perforate Interval: 9885' -
9915'. Pooh. All shots fired, ball recovered. RIH w/ 1.69" x 30' Geo Razor Perf Gun
#2. Tag CIBP & correct depth. Puh & Perforate Interval: 9855' - 9885'. Pick up
above the liner top around ~ 8800'. POP the well down the flowline to HP, and then
LP. No flow to the separator. Call out DHD for fluid level shots.
***Job in Progress***
12/10/2023
LRS CTU #1, 1.50" Blue Coil. Job Objective: Set CIBP, Adperf
Stay at 8800' and continue trying to POP the well to LP. DHD shoots two fluid level
shots at ~ 1450', but still no flow to the pad separator. Start POOH, and at 3000' from
surface the well starts flowing. Lay down spent perf gun, and stab on with 1.75"
DJSN. Monitor the well to ensure it keeps flowing. Well is flowing at ~ 2.5mm/day
gas, 130 bopd, 0% wc. Rig down CTU.
***Job Complete***
Daily Report of Well Operations
PBU E-01B
The CIBP and the adperfs are correctly shown on the new WBS below. -WCB
RIH w/ 1.69" x 30' Geo Razor Perf Gun
#2. Tag CIBP & correct depth. Puh & Perforate Interval: 9855' - 9885'.
j
RIH and set 2-3/8" NS CIBP with bowspring centralizer at 10,090'.
Tag CIBP & correct depth. Puh & Perforate Interval: 9885' -
g
9915'. Pooh.
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU E-01B
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
213-050
50-029-20166-02-00
11350
Surface
Intermediate
Liner
Liner
Liner
9049
2670
8744
1037
884
2461
10090
13-3/8"
11-3/4" x 9-5/8"
7"
3-1/2" x 3-1/4"
2-3/8"
9051
28 - 2698
27 - 8771
8218 - 9255
8944 - 9828
8889 - 11350
28 - 2698
27 - 8287
7786 - 8727
8443 - 9049
8394 - 9049
11200
2670
4760
7020
10530
11780
10090, 10340, 10500, 10700, 10845, 11200
4930
6870
8160
10160
11200
9755 - 11296
7" 29# N-80 26 - 8256
9049 - 9048
Conductor 75 20" 29 - 104 29 - 104 1530 520
No Packer
None
None
Torin Roschinger
Operations Manager
Kirsty Glasheen
Kirsty.glasheen@hilcorp.com
907.564.5278
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028299, 0028304
26 - 7820
N/A
N/A
47
228
9007
23634
36
11
0
0
188
271
N/A
13b. Pools active after work:PRUDHOE OIL
No SSSV Installed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 1:16 pm, Mar 26, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2024.03.26 12:40:17 -08'00'
Torin
Roschinger
(4662)
WCB 2024-07-01
ACTIVITY DATE SUMMARY
3/1/2024
***WELL S/I ON ARRIVAL***(perforating)
RAN 1.75" CENT & 20' x 1.56" (1.72" max) DUMMY GUNS TO SCOOP GUIDE AT
8,880' MD (unable to work past)
RAN 20' x 1.56" (1.72" max) DUMMY GUNS, KJ, 1.50" BOWSPRING CENT, 1.75"
CENT & BULL NOSE TO 9,680' SLM
RAN 10' x 1.56" (1.72" max) DUMMY GUNS, KJ, 1.50" BOWSPRING CENT, 1.75"
CENT & BULL NOSE TO 9,687' SLM
***CONTINUE ON 3/2/24 WSR***
3/2/2024
***CONTINUED FROM 3/1/24 WSR*** (Perforating)
RAN 3' x 1.50" STEM, 1.50" BOWSPRING CENT & 1.75" SAMPLE BAILER TO
9,698' SLM (bailer full of asphaltines)
***WELL S/I ON DEPARTURE***
3/18/2024
LRS CTU #1, 1.50" Blue Coil. Job Objective: Perforate
MIRU and make 1-11/16" NS MHA, 1.50" x 4.0' LRS stingers (x2), 1.68" YJ
bowspring centralizer, 1.75" JSN. RIH and dry drifted to CIBP at 10092CTM. POOH
for logging tools. Make up and RIH with 1.69" HES memory GR/CCL with bowspring
and 1.78" bullnose.
***Job Continued on 3/19/2024***
3/19/2024
LRS CTU #1, 1.50" Blue Coil. Job Objective: Perforate
Continue RIH with 1.69" HES memory GR/CCL with bowspring and 1.78" bullnose.
Tagged CIBP at 10100' and logged out of compression to 8800'. Paint tie-in flag at
9698.98'. POOH and confirm good data (-14.5' correction). MU 1.56" x 31' HES perf
gun (Millennium charges, 6 SPF, 60 degree phase). Start RIH and notice gas
weeping from a flange on the stack. POP the well down it's flowline while POOH.
Break down guns, change-out the flange gasket, PT to ~ 4200 psi. RBIH with perf
guns and perforate 9788' - 9819'. POOH and lay down perf gun. Make up 1.56" x 33'
HES perf gun (Millennium charges, 6 SPF, 60 degree phase) and start RIH.
***Job Continued on 3/20/2024***
3/20/2024
LRS CTU #1, 1.50" Blue Coil. Job Objective: Perforate
Continue RIH with 1.56" x 33' HES perf gun (Millennium charges, 6 SPF, 60 degree
phase). Correct depth at the flag and perforate 9755-9788. POOH. Lay down perf
guns. Well status relayed to pad operator. RDMO.
***Job Complete***
Daily Report of Well Operations
PBU E-01B
g (g
Correct depth at the flag and perforate 9755-9788. POOH
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU
2SHUDWLRQV
3HUIRUPHG
2SHUDWRU1DPH
$GGUHVV
:HOO&ODVV%HIRUH:RUN3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
:HOO1DPHDQG1XPEHU
/RJV/LVWORJVDQGVXEPLWHOHFWURQLFGDWDSHU$$&)LHOG3RROV
$EDQGRQ
6XVSHQG
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO
3HUIRUDWH
3OXJ3HUIRUDWLRQV
5HHQWHU6XVS:HOO
2WKHU6WLPXODWH
)UDFWXUH6WLPXODWH
$OWHU&DVLQJ
3XOO7XELQJ
5HSDLU:HOO 2WKHU
&KDQJH$SSURYHG3URJUDP
2SHUDWLRQVVKXWGRZQ
3UHVHQW:HOO&RQGLWLRQ6XPPDU\
&DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH
([SORUDWRU\
6WUDWLJUDSKLF
'HYHORSPHQW
6HUYLFH
$WWDFKPHQWVUHTXLUHGSHU$$&
:HOO6WDWXVDIWHUZRUN
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH
2,/ *$6
:,1- :$* *,1-
:'63/
*6725 6XVSHQGHG 63/8*
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$XWKRUL]HG7LWOH
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
3%8(%
+LOFRUS1RUWK6ORSH//&
&HQWHUSRLQW'U6XLWH$QFKRUDJH$.
6XUIDFH
,QWHUPHGLDWH
/LQHU
/LQHU
/LQHU
[
[
1
&RQGXFWRU
1R3DFNHU
6WDQ*ROLV
6U$UHD2SHUDWLRQV0DQDJHU
1RHO1RFDV
1RHO1RFDV#KLOFRUSFRP
358'+2(%$<358'+2(2,/
7RWDO'HSWK
(IIHFWLYH'HSWK
PHDVXUHG
WUXHYHUWLFDO
IHHW
IHHW
IHHW
IHHW
PHDVXUHG
WUXHYHUWLFDO
PHDVXUHG
PHDVXUHG
IHHW
IHHW
IHHW
IHHW
PHDVXUHG
WUXHYHUWLFDO
3OXJV
-XQN
3DFNHU
0HDVXUHGGHSWK
7UXH9HUWLFDOGHSWK
IHHW
IHHW
3HUIRUDWLRQGHSWK
7XELQJVL]HJUDGHPHDVXUHGDQGWUXHYHUWLFDOGHSWK
3DFNHUVDQG6669W\SHPHDVXUHGDQGWUXHYHUWLFDOGHSWK
6WLPXODWLRQRUFHPHQWVTXHH]HVXPPDU\
,QWHUYDOVWUHDWHGPHDVXUHG
7UHDWPHQWGHVFULSWLRQVLQFOXGLQJYROXPHVXVHGDQGILQDO
5HSUHVHQWDWLYH'DLO\$YHUDJH3URGXFWLRQRU,QMHFWLRQ'DWD
2LO%EO *DV0FI :DWHU%EO &DVLQJ3UHVVXUH 7XELQJ3UHVVXUH
3ULRUWRZHOORSHUDWLRQ
6XEVHTXHQWWRRSHUDWLRQ
:HOO&ODVVDIWHUZRUN
([SORUDWRU\ 'HYHORSPHQW 6HUYLFH 6WUDWLJUDSKLF'DLO\5HSRUWRI:HOO2SHUDWLRQV
&RSLHVRI/RJVDQG6XUYH\V5XQ
(OHFWURQLF)UDFWXUH6WLPXODWLRQ'DWD
6XQGU\1XPEHURU1$LI&2([HPSW
$'/
1R6669,QVWDOOHG
1$
1$
1$
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
5(32572)681'5<:(//23(5$7,216
6U3HW(QJ 6U3HW*HR
)RUP5HYLVHG6XEPLW:LWKLQGD\VRU2SHUDWLRQV
6U5HV(QJ
1R3DFNHU
UUHFWWRWKHEHVWRIP\N
6HSWHPEHU
By Anne Prysunka at 2:28 pm, Sep 27, 2022
DSR-9/28/22
RBDMS JSB 100322
MGR05OCT2022
$&7,9,7<'$7(6800$5<
/56&78%OXH&RLO-RE6FRSH6HW&,%3DQG$GSHUI
0,58%23WHVW:LWQHVVZDLYHGE\.DP6W-RKQ0DNHXS16GULIWZLWK
+(6*5&&/%+$PD[2'5,+DQGWDJ&,%3DW
0'/RJXSDQG
SDLQW
<HOORZ
IODJDW
(
0&RQWLQXHORJJLQJ22+DW)30WR
322+ 08160+$ZLWK&,%3
-RELQ3URJUHVV
/56&78&7-RE2EMHFWLYH6HW&,%3 $GSHUI
&RQWLQXH5,+ZLWK16&,%3DQGVHWDW
38DQGSDLQW
:KLWH
IODJDW
(
0322+ 08
RI*HR5D]RUSHUIJXQV
3HUIRUDWHZLWK*(25D]RUVVSIGHJUHHSKDVHG&RUUHODWHG
WR6/%0&%/
38+DQG323ZHOOWR(SDGVHSDUDWRU:HOOVWDEOHDQGIORZLQJ322+DQGOD\
GRZQSHUIJXQV:HOOOHIWIORZLQJXSRQGHSDUWXUH3DGRSHUDWRUQRWLILHGRIZHOO
VWDWXV
-RE&RPSOHWH
'DLO\5HSRUWRI:HOO2SHUDWLRQV
3%8(%
M
&,%3DQGVHWDW
3HUIRUDWHZLWK
By Samantha Carlisle at 2:29 pm, Aug 18, 2022
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:213-050
6.50-029-20166-02-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
11350
10845
9043
None
None
10845, 11200
None
Casing: Length: Size: MD: TVD: Burst: Collapse:
Conductor 75 20" 29 - 104 29 - 104 1530 520
Surface 2670 13-3/8" 28 - 2698 28 - 2698 4930 2670
Intermediate 8744 11-3/4" x 9-5/8" 27 - 8771 27 - 8287 6870 4760
Liner 1037 7" 8218 - 9255 7786 - 8727 8160 7020
Liner 884 3-1/2" x 3-1/4" 8944 - 9828 8443 - 9049 10160 10530
Perforation Depth: Measured depth: 10580 - 11296
feet
True vertical depth:9047 - 9048 feet
Tubing (size, grade, measured and true vertical depth)7" 29# N-80 26 - 8256 26 - 7820
Packers and SSSV (type, measured and
true vertical depth)
None
Liner 2461 2-3/8" 8889 - 11350 8394 - 9049 11200 11780
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
N/A
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
78409265
1219950 0
36546
185 726
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
John Condio - (C)
John.Condio@hilcorp.com
Authorized Name:Stan Golis
Authorized Title:
Authorized Signature with Date:Contact Phone:907 564 4696
Treatment descriptions including volumes used and final pressure:
13.
Sr. Area Operations Manager
Operations Performed1.
Abandon Plug Perforations 5 Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured9049
Sundry Number or N/A if C.O. Exempt:
N/A
No SSSV Installed
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Operations shutdown
Change Approved Program
N/A
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend 5Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 0028304 PBU E-01B
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 9:38 am, Aug 16, 2021
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.08.13 15:37:47 -08'00'
Stan Golis
(880)
RBDMS HEW 8/16/2021
, ADL 028299
SFD 8/17/2021
SFD 8/17/2021DSR-8/16/21MGR16AUG2021
ACTIVITY DATE SUMMARY
8/2/2021
CTU 6 1.5" coil 0.109WT
Objective: Caliper, CBP, contingent adperf, contingent RPM/Borax log.
MIRU. Make up 1.85" drift bha with hydraulic centralizer. RIH and tag top of liner at
8897'. Unable to pass attempting different rates and speeds. POOH. Make up drift
BHA #2 with 1.89" bowspring centralizer to be used below CBP and RIH. Once again
unable to pass the top of liner, POOH. Believe 2-3/8" crossover may only drift smaller
than 1.80" OD. MU/RIH with READ memory GR/CCL/MIT24 to 11163'. Log up from
11150 to 8800'. Paint white flag at 10500'. POOH.
***In Progress***
8/3/2021
CTU 6 1.5" coil 0.109WT
Objective: Caliper, CBP, cont adperf, cont RPM/Borax log
Continue POOH with READ memory GR/CC/MIT24. Download data/ship off for
expedited processing. No holes in liner, Make up CBP setting BHA with modified
1.75" bowspring centralizer. RIH and tie in flag, set CBP with top of plug at 10845'.
Pick up 50' and paint white/red tie in flag. Begin bleeding down WHP for drawdown
test. Bled WHP from 2456 to 1485. Gained 10 psi in the first 30 mins and 3 psi in the
2nd 30 mins. PASS. POOH. Trim 50' of pipe and change pack offs. MU 31' of HES
Perfecta with 1.56" centralizer on bottom. Used MV and SSV to lubricate bottom gun.
RIH. Perforate 10780-10811. POOH.
***In progress***
8/4/2021
CTU 6 1.5" coil 0.109WT
Objective: Caliper, CBP, cont adperf, cont RPM/Borax log
Continue OOH with gun run #1. MU/RIH with gun #2 31' of HES Perfecta with 1.56"
centralizer on bottom. Use MV and SSV to lubricate bottom gun. Tie-in to CBP with
flag as verification. Perforate 10580'-10611'. RIH and re-tag CBP and confirmed no
movement. PUH and POP well once above the liner. POOH slowly allowing well to
stabilize. Well flowing as ~16 MMscf/d and ~300 bopd (slugging). Shut in well and Rig
down CTU.
***Job Complete***
Daily Report of Well Operations
PBU E-01B
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:213-050
6.50-029-20166-02-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
11350
11200
9049
None
None
11200
None
Casing: Length: Size: MD: TVD: Burst: Collapse:
Conductor 75 20" 29 - 104 29 - 104 1530 520
Surface 2670 13-3/8" 28 - 2698 28 - 2698 4930 2670
Intermediate 8744 11-3/4" x 9-5/8" 27 - 8771 27 - 8287 6870 4760
Liner 1037 7" 8218 - 9255 7786 - 8727 8160 7020
Liner 884 3-1/2" x 3-3/16" 8944 - 9828 8443 - 9049 10160 10530
Perforation Depth: Measured depth: 10898 - 11296
feet
True vertical depth:9042 - 9048 feet
Tubing (size, grade, measured and true vertical depth)7" 29# N-80 26 - 8256 26 - 7820
Packers and SSSV (type, measured and
true vertical depth)
None
Liner 2461 2-3/8" 8889 - 11350 8394 - 9049 11200 11780
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
N/A
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
796021260
339879 0
27059
236 798
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Noel Nocas
noel.nocas@hilcorp.com
Authorized Name:Stan Golis
Authorized Title:
Authorized Signature with Date:Contact Phone:(907)564-5278
Treatment descriptions including volumes used and final pressure:
13.
Operations Manager
Operations Performed1.
Abandon Plug Perforations 5 Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured9049
Sundry Number or N/A if C.O. Exempt:
N/A
No SSSV Installed
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Operations shutdown
Change Approved Program
N/A
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend 5Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 028304 & 028299 PBU E-01B
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 9:21 am, Mar 04, 2021
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.03.04 07:56:14 -09'00'
Stan Golis
(880)
SFD 3/8/2021MGR12MAR2021DSR-3/4/21 RBDMS HEW 3/4/2021
ACTIVITY DATE SUMMARY
2/25/2021
CTU#9 1.5" CT. Job Scope: Depth Log / Set CIBP / Adperf
MIRU CTU.
***In Progress***
2/25/2021 Heat Upright #083 for coiled tubing to 140*F.
2/26/2021
CTU#9 1.5" CT. Job Scope: Depth Log, Set CIBP, Adperf
Continue Rig up. MU & RIH w/ Slb Logging BHA w/ 1.75" Bowspring Centralizer. Did
not bullhead and was able to snub in at 2300psi whp. No issues getting inside the
Scoop Guide.
***In Progress***cp
2/27/2021
CTU#9 1.5" CT. Job Scope: Depth Log, Set CIBP, Adperf
Lightly Tag PBTD at 11,319' down. Log from compression. Slb Memory Counter quit
working. Slb fixed the issue. Re-log from 11300' to 8805'. Flagged Pipe at 11129'.
Pooh. Wait on weather due to low temps. Lay down Logging Tools. Receive good
data ( - 2.5' Correction). Correlate to Slb MCNL 5-July-2013. MU & RIH w/ Northern
2-3/8" CIBP w/ 1.75" Bowspring Centralizer on bottom. Tag TOL. Unable to hop into
the scoop guide after multiple attempts. Pooh. Recover all tools. Broke 3 teeth from
3 of the upper slips of the CIBP due to side loading tools when tagging the TOL.
Perform Weekly BOP Test.
***In Progress***
2/28/2021
CTU#9 1.5" CT. Job Scope: Depth Log, Set CIBP, Adperf
Finish Weekly BOP Test. RIH w/ Northern CIBP w/ Bowspring. (stiffened springs &
added weight bar). No issues getting thru TOL. Correct depth at Flag. Set top of
CIBP w/ Bowspring Centralizer at 11200'. MU & RIH w/ HES 1.56" x 32' Perfecta
Perf Gun #1. Tag CIBP & correct depth. Perforate Interval 11028' - 11058'. Pooh.
All shots fired, ball recovered. MU & RIH w/ HES 1.56" x 32' Perfecta Perf Gun #2.
Tag CIBP & correct depth. Perforate Interval 10898' - 10928'. Pooh. Call Pad-Op,
POP well while Pooh to HP Header.
***Ran bowspring centralizer below perf guns to get inside the scoop guide***
***In Progress***cp
3/1/2021
CTU#9 1.5" CT. Job Scope: Depth Log, Set CIBP, Adperf, POP Well.
Continue pooh. Unable to pop off well due to -40 temps. Monitor whp & s-riser temp
while flowing well. Temp slowly increasing. Pop off well. All shots fired. Well is
confirmed flowing to the HP Header. Rig Down CTU.
***Job Complete***cp
Daily Report of Well Operations
PBU E-01B