Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout200-162200 -/&Z
by Date: 11/18/2019 3 1 9 9 8
Transmittal Number: 93714
IV 7-Ar
X 4M
Wr
BPXA WELL DATA TRANSMITTAL
Enclosed is a disc with the requested core photos and analysis.
If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendallkb .com.
APLWeIINo
Wlyermit
Well
Nm
Core
Photos
Core Analysis,
Description, etc
50029229780000
2001620
PRUDHOE
BAY
UN
BORE Z-101
50029229880000
2001960
PRUDHOE
BAY
UN
AURO S-104
J
50029229950000
2002080
PRUDHOE
BAY
UNIT
Z-39
50029230080000
2010590
PRUDHOE
BAY
UN
BORE V-100
50029231610000
2031030
PRUDHOE
BAY
UN
BORE V-111
J
50029233880000
2080530
PRUDHOE
BAY
UN
ORIN L-205
L -205P81*
*Plug -back analysis located in BP archive database.
Please sign and email a copy of this transmittal to. GANCPDCAbp365.onmicrosoft com
Thank you,
Mer
.Merion Xendad
SIM Specialist
$SIM
BP Exploration Alaska�900 E. Benson B1vd.lRoom: 716BIAnchorage, AK
Subsurface Information Management
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
JAN 3 0 2020
X11
AOGCC
I~ J
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
August 14, 2009
~ ~,:~-, ~,i~; i ~ <:~ ~~~a`~
;~_~ ~~ ~~~~~
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPB Z-Pad
Dear Mr. Maunder,
.
bp
~~~~~~E~
OCT ~ 5 2009
~lask~ Qil ~ Gas Cons. Go~nisRian
Anchorap~
o~D~ -' l (~~
~~- `~ ~
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z-
Pad that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
SincereJy,
Torin Roschinger
BPXA, Well Integrity Coordinator
• ~
BP Expioration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Date
Z-Pad
8/13/2009
Well Name
PTD #
API #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitod
sealant date
ft bbls ft na al
Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009
Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7l2M2009
Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009
Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009
Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009
Z-06 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009
Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009
Z-OSA 1931280 50029217870100 NA 0.2 NA 2.55 7/24/2009
Z-O9A 2081410 50029219670100 NA 0.2 NA 1.70 7/24/2009
Z-10 1891160 50029219860000 NA 1.3 NA 11.10 7/24/2009
Z-11A 2050310 50029220530100 NA 0.2 NA 1.70 7/26/2009
z-~2 1891020 5oo2s21snoooo NA 1.2 NA &.so 7~2s/2oos
2-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009
Z-146 2060990 50029218440200 NA 0.2 NA 1.70 7/26/2009
Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009
Z-16 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009
Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009
Z-18 1890960 50029219710000 NA 02 NA 1.70 7/26/2009
Z-19A 2061050 5002922251ot00 NA 0.2 NA 1.70 7/26/2009
Z-20 1881000 50029218590000 NA 0.2 NA 1.70 7/26/2009
Z-21A 2001010 50029219380100 NA 0.2 NA 1.70 7/23/2009
Z-22B 1960350 50029220370200 NA 0.5 NA 5.10 7/23/2009
Z-23B 2041080 50029219500200 NA 0.3 NA 1.70 ~/23/2009
Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009
Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009
Z-26A 2060790 50029219450100 NA 0.3 NA 3.40 7/23/2009
Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009
Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25l2009
Z-29 1890650 50029219540000 NA 0.2 NA 1.70 7/25/2009
Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009
Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009
Z-326L1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009
Z-33A 1890050 50029218950t00 NA 0.5 NA 3.40 S/8/2009
Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009
Z-38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009
Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009
Z-46A 205203Q 50029232800t00 NA 1.7 NA 13.60 7/26i2009
Z-100
Z-101
Z-102 2031710
2001620
2070500 50029231820000
50029229780000
50029233530000 NA
NA
NA 5
1
1.5 NA
NA
NA 45.90
t0.20
15.30 7/23/2009
7/23/2009
7/25/2009
Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2009
Z-108 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009
Z-112 2071720 5002923380000o NA surface NA
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc
MICROFILMED
04/01/05
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
Permit to Drill 2001620
MD 9950 ~ TVD
DATA SUBMITTAL COMPLIANCE REPORT
4118~2003
Well Name/No. PRUDHOE BAY UN BORE Z-10'I Operator BP EXPLORATION (ALASKA) INC
7029 ----- Completion Dat 4/23/2001 ---' Completion Statu 1-OIL
Current Status 1-OIL
APl No. 50-029-22978-00-00
UIC N
REQUIRED INFORMATION
Mud Log No Sample N._Qo
Directional Survey
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Fmt
i ED D Ver LIS Verification
Log Log Run
Name Scale Media No
Interval
Start Stop
100 9921
(data taken from Logs Portion of Master Well Data Maint)
OH I Dataset
CH Received Number Comments
Open 2/1/2002 ""10620
Cn See Notes
De Density
L.Po-m Cement Evaluation
Ind Induction/Resistivity
So Sonic
Ne Neutron
Cn See Notes
Cn
See Notes
Directional Survey
4,~Array
mp. Neu. Three
~tector Den
~,,"BHCS
~,~C. ement Volume
,.,.4alEX Array
10027
__...Directional Survey
1
2 BS 1
2 BS 1
25 BS 1
25 BS 1
2 BS 1
25 BS 1
25
2/5
2/5
2/5
5
5
2/5
BS
1
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
420O
3006
3023
3023
3023
3023
3023
3023
4200
3023
4294
4294
4294
4294
4294
4294
4200
9945 Open 3/23/2001 L"r0027
9410 6~---~5/17/2002 ~1,0837
9369 Case 5/17/2002
9370 Case 5/17/2002
9400 Case 5/17D002
9386 Case 5/17/2002
9369 Case 5/17/2002
9400 C~/~ 5/17/2002
9945
9400
9945
9945
9945
9945
9945
9945
9945
Open 3/2/2001 ~J;~54
Case 5/17/2002
2/22/2001
oh 3/23/2001
oh 3/23/2001
oh 3/23/2001
oh 3/2/2001
oh 3/2/2001
oh 3/2/2001
oh 3/23/2001 ~0'027
2/22/2001
4200-9945
PEX AlT BHC Data
HCAL - PEX Caliper
Platform Express Triple
combo
4200-9945
Platform Express Triple
combo
Dir Survey Paper Copy
4294-9945 BL, Sepia
4294-9945 BL, Sepia
4294-9945 BL, Sepia
4294-9945 BL, Sepia
4294-9945 BL, Sepia
4294-9945 BL, Sepia
4200-9945 Digital Data
Dir Survey Digital Data
Permit to Drill
MD 9950
C
I ED C
[
2001620
DATA SUBMITTAL COMPLIANCE REPORT
4/18/2003
Well Name/No. PRUDHOE BAY UN BORE Z-101
Operator BP EXPLORATION (ALASKA) INC
TVD 7029
.
Completion Dar 4/23/2001
Completion Statu 1-OIL
Current Status 1-OIL
~>I~R Total Porosity 2
FINAL 6220 9820 oh 3/2/2001
C
Cn See Notes
9954
~SSTVD 2/5
~-"~MR 5
~,~'P EX Neutron/Density 2/5
¢--15~1CS 2/5
FINAL 4200 9945 oh
FINAL 4294 9945 oh
FINAL 4294 9945 oh
FINAL 4294 9945 oh
FINAL 4294 9945 oh
FINAL 4294 9945 oh
1, 109 9950 Open
3/2/2001 ~54
3/2/2001
3/2/2001
3/2/2001
3/2/2001
3/2/2001
7/10/2002 ~,.1,0969
APl No. 50-029-22978-00-00
UIC N
6220-9820 Color Print
4200-9945 Digital Data
4294-9945 BL, Sepia
4294-9945 BL, Sepia
4294-9945 BL, Sepia
4294-9945 BL, Sepia
4294-9945 BL, Sepia
Digital Log Images
Well Cores/Samples Information:
Name
Start
Interval
Stop
Dataset
Sent Received Number
Comments
ADDITIONAL INFORMATION
Well Cored? ~ N
Chips Received? ~"'~i~ N
Analysis Y / N
R ~.r.~ iv~.d ?
Daily History Received? ~/N
Formation Tops ~ N
Comments:
Compliance Reviewed By: Date:
CORE LABORATORIES, INC.
HO US TON A D VA NCED TECHNOL 0 G Y CENTER
Company · B P Exploration (Alaska) Inc. ~.~
Well · Z-101
Field · Borealis
Location · Alaska ~ ~ ~,r~
CL File No · Hou-010006
Date · February 14, 2001
Analysts · LonglKoster
CMS-300 CONVENTIONAL PLUG ANALYSIS
° m
Sample Depth Reservoir Porosity Permeability b(He) Beta Alpha I Grain
Number Net Overburden Klinkenberg I Kair Densi~
ft psig % md psi ft(-t) microns I~llcm3
1# 9552.6 15.45 2.765
2V 9553.3 800 2.53 0.001 0.003 164.00 1.03E+16 2.92E+04 3.303
2 9553.4 800 7.86 0.012 0.022 71.70 3.39E+14 1.23E+04 3.147
3 9554.8 800 20.85 0.197 0.260 22.38 3.27E+11 2.00E+02 2.997
4 9555.6 800 25.73 12.416 13.676 5.46 2.23E+09 8.91E+01 3.003
5V 9556.2 800 9.61 0.002 0.005 135.28 2.32E+15 1.44E+04 3.122
5 9556.5 800 18.19 0.157 0.207 22.93 5.47E+11 2.66E+02 3.160
6 9557.3 800 9.33 0.001 0.003 159.51 8.30E+15 2.63E+04 3.120
7 9558.2 800 21.78 50.561 53.864 3.26 3.46E+08 5.63E+01 2.899
8 9559.3 800 15.88 0.007 0.015 100.35 2.30E+14 4.83E+03 3.142
9 9560.6 800 13.23 0.003 O. 006 128.67 1.58E+15 1.20E+04 3.150
9V 9560.8 800 17.40 0.009 0.014 38.32 8.64E+13 2.41E+03 3.140
10 9561.6 800 17.36 0.043 0.069 45.38 1.80E+14 2.34E+04 3.180
11V 9562.3 800 17.53 2.977 3.311 6.57 3.59E+10 3.41E+02 3.152
11 9562.4 800 17.03 0.726 0.910 16.22 1.49E+11 3.38E+02 3.218
12'** 9563.3 3.085
13 9564.9 800 12.62 0.029 0.052 66.07 1.75E+13 1.48E+03 3.128
14V 9565.7 800 11.98 4.363 4.903 7.05 8.19E+10 1.15E+03 3.133
14 9565.7 800 20.88 3.171 3.597 7.84 9.58E+09 9.68E+01 3.150
15 9566.8 800 14.85 1.395 1.596 8.84 1.29E+11 5.68E+02 3.062
16 9567.7 800 13.13 0.057 0.096 50.52 5.84E+12 1.00E+03 3.254
16V 9567.8 800 14.81 0.013 0.025 84.30 1.43E+13 5.26E+02 3.229
17 9568.8 800 17.09 2.795 3.141 7.26 1.38E+10 1.24E+02 3.050
18 9569.7 800 20.31 6.134 6.976 7.67 1.71E+09 3.37E+01 2.988
19 9570.4 800 12.96 0.684 0.802 11.01 3.40E+11 7.35E+02 3.145
20 9571.6 800 9.39 0.005 0.010 109.66 4.50E+14 6.63E+03 3.180
21V 9572.2 800 17.66 0.059 '0.078 24.22 4.20E+12 7.69E+02 3.217
21 9572.6 800 16.59 0.052 0.080 42.01 5.67E+12 9.61E+02 3.221
PRELIMINARY REPORT Page 1
CORE LABORATORIE$, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
Company · B P Exploration (Alaska) Inc.
Well · Z-101
Field · Borealis
Location · Alaska
CL File No · Hou-010006
Date · February 14, 2001
Analysts' LonglKoster
CMS-300 CONVENTIONAL PLUG ANALYSIS
Sample Depth Reservoir Porosity Permeability b(He) Beta Alpha I Grain
Number Net Overburden Klinkenberg I Kair Densit',
ft psig % md psi ft(-1) microns I~llcm3
° m
22 9574.3 800 10.27 0.026 0.038 35.48 5.29E+12 4.52E+02 3.157
23 9577.3 800 17.54 46.15 51.56 5.86 1.13E+09 1.68E+02 2.658
24 9578.7 800 9.92 0.011 0.023 88.94 8.91E+13 3.09E+03 3.232
25 9579.8 800 18.79 0.309 0.448 30.29 1.40E+12 1.36E+03 3.052
25V 9579.8 800 20.35 0.973 1.358 24.77 5.14E+10 1.57E+02 2.834
26 9580.4 800 7.28 0.004 0.008 81.16 1.22E+14 1.43E+03 3.188
27 9581.8 800 19.04 0.654 0.929 27.00 1.98E+11 4.06E+02 2.888
28V 9582.7 800 21.21 1.394 1.821 18.73 1.18E+11 5.22E+02 2.872
28 9582.8 800 22.09 1.301 1.718 19.69 8.42E+10 3.47E+02 2.925
29 9583.5 800 7.71 0.033 0.059 62.43 1.39E+13 1.36E+03 3.124
30V 9584.5 800 19.40 0.632 0.884 25.68 2.01E+11 3.98E+02 2.797
30 9584.6 800 22.18 1.645 2.143 18.34 3.40E+10 1.77E+02 2.870
31 9585.3 800 21.68 1.115 1.511 22.06 9.14E+10 3.21E+02 2.830
31V 9585.5 800 20.70 0.811 1.121 24.23 2.35E+11 5.99E+02 2.872
32 9586.3 800 17.96 1.009 1.321 19.33 9.43E+10 2.99E+02 2.885
33 9587.5 800 20.68 1.891 2.440 17.40 4.40E+10 2.64E+02 2.781
33V 9587.7 800 19.40 0.654 0.926 26.70 3.46E+11 7.09E+02 2.729
34 9588.2 800 23.34 7.285 8.695 10.69 1.09E+09 2.54E+01 2.805
35 9589.7 800 18.34 1.139 1.566 23.24 6.60E+10 2.37E+02 2.661
36 9590.5 800 17.08 2.103 2.698 16.86 1.82E+10 1.22E+02 2.690
36V 9590.6 800 17.07 0.531 0.770 29.30 2.63E+11 4.36E+02 2.649
37 9591.2 800 15.30 1.179 1.571 20.51 6.74E+10 2.51E+02 2.626
38 9592.9 800 18.91 1.299 1.737 20.66 6.78E+10 2.78E+02 2.703
39 9593.4 800 18.80 2.059 2.738 19.55 1.89E+10 1.26E+02 2.653
39V 9593.6 800 16.58 0.782 1.054 22.10 9.84E+10 2.41E+02 2.820
40 9594.6 800 17.56 1.421 1.878 19.66 4.58E+10 2.06E+02 2.641
41 9595.6 800 20.56 8.939 10.43 9.14 6.11E+08 1.75E+01 2.644
41V 9595.6 800 22.16 4.303 5.316 13.40 1.46E+09 2.01E+01 2.648
PRELIMINARY REPORT Page 2
CORE LABORATORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
Company · B P Exploration (Alaska) Inc. ~._
Well · Z-101
Field · Borealis
Location ' Alaska
CL File No · Hou-010006
Date · February 14, 2001
Analysts' LonglKoster
CMS-300 CONVENTIONAL PLUG ANALYSIS
Sample Depth Reservoir Porosity Permeability b(He) Beta Alpha I Grain
Number Net Overburden Klinkenberg I Kair Densib.
ff psig % md psi fi(-1) microns
rtl
42 9596.4 800 21.16 11.82 13.78 8.90 5.61E+08 2.13E+01 2.650
43 9597.4 800 20.94 9.513 11.27 10.03 6.28E+08 1.93E+01 2.654
43V 9597.8 800 20.34 2.314 2.908 15.18 1.66E+10 1.22E+02 2.652
44 9598.2 800 20.80 10.22 11.83 8.52 6.11E+08 2.00E+01 2.657
45 9599.7 800 19.38 2.535 3.204 15.53 2.04E+10 1.64E+02 2.693
45V 9599.7 800 19.54 1.152 1.546 21.06 4.61E+10 1.72E+02 2.662
46 9600.9 800 19.08 0.641 0.908 26.64 2.11E+11 4.24E+02 2.927
47V 9601.1 800 21.33 0.906 1.224 21.99 3.54E+11 1.03E+03 2.942
47 9601.9 800 21.37 0.949 1.290 22.38 9.15E+10 2.81E+02 2.930
48 9602.4 800 20.75 1.742 2.173 14.85 5.72E+10 3.23E+02 2.967
49# 9603.6 22.32 3.060
50 9604.3 800 18.37 0.416 0.604 29.80 3.86E+11 5.20E+02 2.901
50V 9604.5 800 18.07 0.432 0.613 27.47 6.33E+11 8.86E+02 2.843
51 9605.3 800 21.34 4.533 5.492 11.96 8.80E+09 1.29E+02 2.921
52 9606.4 800 18.31 1.039 1.388 20.83 8.24E+10 2.77E+02 2.768
53 9607.5 800 19.50 12.28 13.94 7.18 4.00E+09 1.59E+02 2.792
53V 9607.5 800 19.10 2.244 2.773 13.91 3.58E+10 2.60E+02 2.810
54 9608.8 800 24.57 537.4 543.2 0.48 1.41E+07 2.46E+01 2.638
55V 9609.5 800 25.18 504.1 514.2 0.90 1.84E+07 3.01E+01 2.639
55 9609.7 800 24.45 543.7 549.3 0.47 1.41E+07 2.49E+01 2.641
56 9613.7 800 10.46 1.160 1.266 5.61 8.38E+10 3.15E+02 2.631
57 9614.8 800 11.28 0.324 0.464 28.69 1.63E+12 1.71E+03 2.619
57V 9614.9 800 12.30 0.026 0.047 60.91 2.56E+14 2.18E+04 2.600
58 9615.7 800 13.68 O. 195 0.283 30.77 4.09E+12 2.59E+03 2.622
59# 9616.2 15.09 2.624
59V 9616.2 800 13.71 0.128 0.184 31.66 6.47E+11 2.67E+02 2.617
60# 9620.7 7.85 2.668
61# 9622.6 15.20 2.643
PRELIMINARY REPORT Page 3
° rtl
CORE LABORATORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
Company · B P Exploration (Alaska) Inc.
Well · Z-101
Field · Borealis
Location · Alaska
~E~ ~LZ'~H s~lY]c~s
CL File No · Hou-010006
Date · February 14, 2001
Analysts · LonglKoster
CMS-300 CONVENTIONAL PLUG ANALYSIS
Sample Depth Reservoir Porosity Permeability b(He) Beta Alpha I Grain
Number Net Overburden Klinkenberg I Kair Densib.
ft psig % md psi fi(-1) microns Iglcm3
62** 9623.7 13.52 < 0.001 2.617
62V 9625.3 800 13.63 0.752 0.874 10.25 4.13E+11 1.01E+03 2.656
63V 9625.3 800 12.09 0.020 0.035 60.11 7.86E+14 5.10E+04 2,623
64 9627.4 800 10.05 0.095 0.145 38.68 1.89E+12 5.78E+02 0.000
65 9628.2 800 15.03 9.877 11.11 6,76 4.63E+09 1.48E+02 0.000
66 9629.5 800 13.67 1.336 1.631 13.46 5.10E+10 2.21E+02 0,000
66V 9629.7 800 11.67 0.009 0.017 69.01 7.93E+14 2.44E+04 2.633
67V 9631.7 800 12.53 0.028 0.048 55.34 5.60E+13 5.15E+03 2,641
67 9631.8 800 13.28 0.940 1.142 13.39 1.35E+11 4.10E+02 2.615
68 9634.5 800 12.96 0.504 0.589 11.01 6.27E+11 1.02E+03 2,662
69* 9638.9 800 16.56 1.379 1.743 16.07 8.37E+10 3.74E+02 2.624
70V 9642.5 800 10.65 0.033 0.043 24.63 1.20E+13 1.27E+03 2,643
70 9642.7 800 11.00 0.075 0.117 41.14 1.14E+11 2.78E+01 2,630
71 9647.9 800 14.93 41.67 44.70 3.63 7.68E+08 1.04E+02 2.643
72V 9648.1 800 12.68 0.085 0.133 41.79 4.47E+12 1.22E+03 2.644
72 9648.4 800 13.40 0.516 0.685 21.15 3.67E+11 6.13E+02 2.650
73 9650.3 800 13.63 0.571 0.751 20.31 7.61E+11 1.41E+03 2.640
74 9652.1 800 14.01 1.920 2.276 11.06 4.57E+10 2.84E+02 2,643
* Fracture(s) Visible in Sample.
** Sample Permeability < 0.001. Ambient Porosity Reported.
*** Sample Failed During Analysis.
#Sample Unsuitable For Permeability Measurement. Ambient Porosity Reported.
PRELIMINARY REPORT Page 4
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate _
Long Term Shut-In Pull tubing _ Alter casing _ Repair well _ Other _X
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchora~le, AK 99519-6612
5. Type of Well:
Development _X
Exploratory__
Stratigraphic_
Service__
4. Location of well at surface
721' FNL, 3013' FEL, Sec. 19, T11N, R12E, UM
At top of productive interval
801' FNL, 1467' FEL, Sec. 13, T11N, R11E, UM
At effective depth
691' FNL, 1558' FEL, Sec. 13, T11N, R11E, UM
At total depth
652' FNL, 1589' FEL, Sec. 13, T11 N, R11 E, UM
(asp's 599659, 5959360)
(asp's 596186, 5964516)
(asp°s 596094, 5964625)
(asp's 596062, 5964663)
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 110'
Surface 2616'
Production 9465'
9950 feet Plugs (measured)
7029 feet
9836 feet Junk (measured)
6926 feet
6. Datum elevation (DF or KB feet)
RKB 82 ' feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Z-101
9. Permit number / approval number
200-162 / 302-161
10. APl number
50-029-22978-00
11. Field / Pool u~~ ~
Prudhoe Bay Field / K .
Size Cemented Measured Depth True Vertical Depth
20" 72 cf 137' 137'
13-3/8" 3585 cf 4294' 3109'
9-5/8" 1939 cf 9923' 7004'
Perforation depth:
Tubing (size, grade, and measured depth)
Packers & SSSV (type & measured depth)
measured Open Pelfs 9552'- 9598' RECEIVE0
true vertical Open Pelfs 6681'-6720' NOV 0 6 2002
T 'r~l~
eons. commlg lo
3-1/2" 9.2# L-80 TBG ~ 9387'. 3-1/2" 9.2# L-80 ub~ '""'"'""Anchorage
~7" x 3-1/2" Baker S-3 Packer @ 9387' MD.
3-1/2" HES 'X' Nipple @ 2218'.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation Shut-In
Subsequent to operation Shut-In
OiI-Bbl
Representative Daily Avera.qe Production or Iniection Data
Gas-Mcf Water-Bbl
Casing Pressure Tubing Pressure
400
15. Attachments
Copies of Logs and Surveys run _
Daily Report of Well Operations _
16. Status of well classification as:
Oil~X Gas_ Suspended_
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
,~ ~~f~~~~ Title: Technical Assistant
DeWayne R. Schnorr
Date October 22, 200.2
Prepared b~/DeWayne R. Schnorr 564-5174
Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE
Z-101
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
08/20/2002 SECURE WELL: HYDRATE / ICE PLUG
08/21/2002 SECURE WELL: HYDRATE / ICE PLUG
08/22/2002 SECURE WELL: TUBING TAIL PLUG
08/23/2002 SECURE WELL: HYDRATE / ICE PLUG
08/24/2002 SECURE WELL: DRIFT/TAG; TUBING TAIL PLUG / LONG TERM SHUT-IN
EVENT SUMMARY
08/20/02 PRESSURE UP ON ICE PLUG IN TUBING.
08/21/02
PUMP 150 BBLS. DIESEL. DOWN I.A. @ 180 DEGREES TO THAW ICE PLUG.
PUMPED 14 BBLS DIESEL. DOWN FLOWLINE AND 26 BBLS. DIESEL. DOWN
TUBING. TO FREEZE PROTECT.
O8/22/O2
RAN 2.78" CENTRALIZER. SAT DOWN @ 3890' WLM. RAN 5' x 2.5" PUMP
BAILER TO 3974' WLM. SAMPLE OF HYDRATES. LEFT WELL SHUT-IN.
NOTIFIED OPERATOR.
O8/23/O2
PUMP NEAT METHANOL AND HOT DIESEL DOWN THE TUBING TO CLEAR
HYDRATES. (60 BBLS OF DIESEL AND 102 BBLS OF METHANOL.)
O8/24/O2
SET 2.81 XX PLUG AT BOTTOM X NIPPLE AT 9420' 660 PSI ON TBG. RAN
CHECK SET. GOOD SET. PT PLUG TO 1500 PSI. BLED TBG BACK TO 400 PSI.
SET 2.81 XX PLUG AT TOP X NIPPLE AT 2198'. RAN CHECK SET. GOOD. PT
PLUG TO 1500 PSI. BLED BACK TO 400 PSI LEFT WELL SHUT IN & TAGGED.
NOTIFIED OPER.
WELL SHUT-IN FOR THE LONG TERM.
FLUIDS PUMPED
BBLS
102 NEAT METHANOL
338.6 DIESEL
70 DEAD CRUDE
302 SEA WATER
812.6 TOTAL
Page 1
WELL LOG TRANSMITTAL
To: State of Alaska July 09, 2002
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs' Z-101 BOREALIS, AK-MM-00308
Z-101 BOREALIS:
Digital Log Images:
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Cemer LR2-1
900 E. Benson iBlvd.
Anchorage, Alaska 99508
Date:
RECEIVED
JUL 1" 2002
Ala~a Oil & Gas Co~s. Commission
AnchotBDe
2002
Schlumberger
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATrN: Beth
NO. 2078
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Borealis
Well Job # Log Description Date Color Sepia BL CD
V-101 22207 PEX AlT BHC 04/25/02 !
V-101 22207 PEX AlT 04/25/02 1 1
V-101 22207 PEX DEN/NEUTRON 04/25/02 1 1
V-101 22207 PEXTRIPLE COMBO 04/25/02 1 1
V-101 22207 PEX TRIPLE COMBO SSTVD 04/25/02 1 1
V-101 22207 BHC 04/25/02 1 1
V-101 22207 CEMENT VOLUME LOG 04/25/02 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
Date Delivered:
RECEIVED
2002
AlmlmOil&B sCons.
Schlumberger DCS
3940 Arctic BIvd Suite 300
Anchorage AK 99503-5789
ATTN: Sherrie
Receive~ ~
I
(
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of request:
Abandon_ Suspend_X Operational shutdown _ Re-enter suspended well _
Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _
Change approved program _ Pull tubing _ Variance _ Perforate _
Other _
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
5. Type of Well:
Development
Exploratory __
Stratigraphic __
Service_
4. Location of well at surface
721' FNL, 3013' FEL, Sec. 19, T11N, R12E, UM
At top of productive interval
801' FNL, 1467' FEL, SEC 13, T11N, R11E, UM
At effective depth
691' FNL, 1558' FEL, Sec. 13, T11N, R11E, UM
At total depth
652' FNL, 1589' FEL, Sec 13 T11N, R11E, UM
(asp's 599659, 5959360)
(asp's 596186, 5964516)
(asp's 596094, 5964625)
(asp's 596062, 5964663)
6. Datum elevation (DF or KB feet)
RKB 82.0 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Z-101
9. Permit number / approval number
200-162
10. APl number
50-029-22978-00
11. Field / Pool
Prudhoe Bay Field / Kuparuk River Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 110'
Surface 2616'
Production 9465'
9950 feet Plugs (measured)
7029 feet
9836 feet Junk (measured)
6926 feet
Size Cemented Measured Depth True vertical Depth
20" 72 c.f. 137' 137'
13-3/8" 3585 c.f. 4294' 3109'
9-5/8" 1939 c.f. 9923' 7004'
Perforation depth:
measured Open Perfs 9552'- 9598'
true vertical Open Perfs 6681' - 6720'
Anchorage
Tubing (size, grade, and measured depth 3-1/2" 9.2#, L-80 TBG @ 9387'. 3-1/2" 9.2# Tubing Tail to 9445'.
Packers & SSSV (type & measured depth) 7" x 3-1/2" Baker S-3 Packer @ 9387' MD.
3-1/2" HES 'X' Nipple @ 2218'.
13. Attachments Description summary of proposal _X Detailed operations program __ BOP sketch
15. Status of well classification as:
14. Estimated date for commencing operation
May 15, 2002
16. If proposal was verbally approved
Name of approver
Date approved
Oil __ X Gas __ Suspended _
Service
17. I hereby certify that the foregoing is true ~d correct to the best of my knowledge. Questions? Call Bruce W. Smith @ 564-5093.
Signed I~~ ~ Title: Borealis Development Petroleum Engineer Date May 09, 2002
Bruce W. Smith Prepared by DeWar/ne R. Schnorr 564-5174
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity __ BOP Test _
Mechanical Integrity Test _
Approved by order of the Commission
Form 10-403 Rev 06/15/88
Location clearance__ /"'/0¢
Subsequent form required 10-
Ong~nal S~gned b~
Camm~f Oechsli Taylor Commissioner
J Approval no,~,t¢l ~,,- ,J (~ I
Date
SUBMIT IN TRIPLICATE
bp
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P. O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
May 09, 2002
Tom Maunder
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, AK 99501
Dear Tom:
Re: Sundry Notice for Z-101 --- Long Term Suspension.
BP Exploration Alaska, Inc.proposes, .,., .1'-'"'-,. ~ ,,-,r,~ ...... su__,pens!e.q-for well Z-101 . Well Z-101
has now completed its tract operations flow period. Information has been gathered and
will be evaluated for future utility of this wellbore.
Category IOR Step Description
S State 1
P State 2
S State 3
O State 4
Shut-in wellbore, Plug in tailpipe
Pump diesel to freeze protect Ann/Tub
Place plug in nipple (2218 MD)
Freeze Protect Tree/Flow line, BPV
Last Test:
Max. Deviation:
?¢r£s:
Min. ID:
Last TD tag:
Last Downhole Ops:
Latest H2S value:
Reference Log:
BHT & BHP:
2/17/02, 68 BOPD
60.0 @ 6201' mdDeviation at perfs: 32.0
9552-9578 MD
Four .... 2.813" at X nipples, see schematic
9836' MD based on tubing casing tally
PPRQF 12/23/01
0 PPM 6/12/01
Schlumberger Platform express Jan 5, 2001
147° F & psia @ 3431'@6712 TVDSS
The procedure includes the following major steps:
S-Line:
1. Slickline, shut-in well, place plug into 3 ½" HES X nipple at 9433 MD. Test set.
Pump:
2. RU Hot Oiler, and pump diesel (107 bbl ) to freeze protect the annulus and tubing to
3000 ft MD.
Slickline:
3. Place plug into 3 1/2" HES X nipple at 2218 MD. Test set.
Other
4. Displace tree with neat MEOH, do not use diluted MEOH, and place BPV into tree
profile. Freeze protect flow line from tree. Complete a full grease service of all vanes.
Service Well'~lt, .. Close Master Valve, SSV, Wing valve(" 't lateral valve. Arrange for
gas lift line to be blinded off at tree. Arrange for isolation of any corrosion chemical
service lines to be isolated and purged. Tag Master VaNe xvith laminated sign using
xvire tie (not string) with the following information:
i. Well Z-101
ii. API 50-029-22978-00 Sec. 19, T1 IN, R12E
Operator BP Exploration (Alaska), INC.
iii. Borealis Owner Group, Contact Satellite Manager (907)-564-5143, prior
to any removal or cannibalization of equipment.
iv. Well Long term suspended xx/xx/02
v. Well has plugs installed at 9433 MD, 2218 MD, and BPV in Tree.
vi. Well is freeze protected with diesel, both annulus and robing, to 3000 ft.
vii. Tree has been serviced, tree freeze protected with Neat MEOH.
viii.Flow line freeze protected
Please call (Brace Smith 564-5093, hm: 345-2948, cell: 440-8008) if there are any questions.
Sincerely,
Bruce Smith
Greater Prudhoe Bay
Aurora Development Engineer
TREE= 4-1/16" - 5MCIW I '
WELLHEAD= 11" - 5M FIVE G5I SAFETY NOTES
KB. ELEV = 81.8'
KOP = 726'
MaxAn~lb= 60°~6201' I I--'~ 2218' I---~ 3-1/2"HES'X'NIPPLE, ID=2.813"
Datum MD = .
Datum TVD= 8800' I
GAS LIFT MANDRELS
STA IVD 'rVD DEV TYPE VLV LATCH! SIZE
~ Minimum E) = 2.813" @ 2218',,-.-..-- m m 3 5297 3564 59 cA rv~Gi ~ RK
3-1/2" HES'X'NIPPLE J L 2 8130 r~o6 38 cA ~G~DV/ RK 1-1~"
17" MARKER JT W/RA TAG I~ 6746'I --i --
~ ~EI~OI~IION SUMMA
I~FLO~: SWS F~TFOI~M EX~01/05/01
ANGLE AT TO~ PEI~::
Noto: Rofor ~o ~roduetion DB for historical porf data
SIZE: SPF INTERVAL Opn/Sqz DA~E
2-1/2" 4 9552- 9598 O 04/23/01 r
[
2-1/2" 6 9684- 9702 O 11/26/01
J NOTE: 7" LINER XO FROM 29#, L-80
NSCC TO 29#, L-80 BTC-M @ 9,753'
I
17,'csG,29~,L-a°'BTc'M'D:6.182.' I-t 9923'1 i iL
DATE REV BY COMIVENTS DATE REV BY cOrVlVlENTS BOREALIS
01/10/01 PGS As Completed, Nabors 9ES 11/26/01 CWS/KAK ADPERFS WELL: Z-101
01/26/01 SIS-MD RNAL PERrvlT No: 200-162
03/16/01 CH/TP COI~,ECTIONS APl No: 50-029-22978-00
05/09101 RAC/KAK PERFS Sec. 19, Tl11~ R12E
11/17/01 DRS/KK PERF& PEFWIIT# CORRECTIONS BP Exploration (Alaska)
SIZE SPF INTERVAL Opn/Sqz DA'rE
2-1/2" 4 9552- 9598 O 04/23/01
2-1/2" 6 9684- 9702 O 11/26/01
WELL LOG TRANSMITTAL
To: State of Alaska January 29, 2002
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7~ Avenue, Suite 100
Anchorage, Alaska
RE: MWD Formation Evaluation Logs Z-101, AK-MM-00308
1 LDWG formatted Disc with verification listing.
API#: 50-029-22978-00
PLEASE ACKNOWiLEDGE RECEIPT iBY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim GaMn
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Cemer LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
0 !
Alaska Oil & Oas Cons. Comfnissio~
01 / 14/02
Scklumberger
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATrN: Sherrle
NO. 1720
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Polaris,Botealis, Midnight Sun
Well Job # Log Description Date Color Sepia BL CD
W-201 ~0/-~:)5 / LEAK DETECTION LOG 12/17/01 1 1
Z-101 <::~(::)O-/~==,~ J PRODUCTION PROFILE 12/23/01 1 1
E-104 ,~-~ C~/---c~ 0 "~ 21524 USIT 12/11/01 2
.I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnlcal Data Center LR2-1
900 E Benson BIvd0
Anchorage AK 99508-4254
Date Delivered:
RECEIVED
2002
Schlumberger DCS
3940 Arctic Blvd Suite 300 .
Anchorage AK 99503-5789
AT[N: Sherrie
i' STATE OF ALASKA ('
ALASKA OIL AND GAS CONSERVATION COMMISSION
R£PORT OF SUNDRY Will_l_ OPERATIONS
1. Operations pedormed: Operation shutdown_ Stimulate _ Plugging _ Perorate _X
Add Perfs Pull tubing _ Alter casing _ Repair well _ Other _
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
721' FNL, 3013' FEL, Sec. 19, T11N, R12E, UM
At top of productive interval
801' FNL, 1467' FEL, Sec. 13, T11N, R11E, UM
At effective depth
691' FNL, 1558' FEL, Sec. 13, T11N, R11E, UM
At total depth
652' FNL, 1589' FEL, Sec. 13, T11N, R11E, UM
5. Type of Well:
Development __X
Exploratory__
Stratigraphic__
Service_
(asp's 599659, 5959360)
(asp's 596186, 5964516)
(asp's 596094, 5964625)
(asp's 596062, 5964663)
6. Datum elevation (DF or KB feet)
RKB 82 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Z-101
9. Permit number / approval number
200-162
10. APl number
50-029-22978
11. Field / Pool
Prudhoe Bay Field / Kuparuk River Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
9950 feet Plugs (measured)
7029 feet
Effective depth: measured 9836 feet Junk (measured)
true vertical 6926 feet
Casing Length Size Cemented Measured Depth True Vertical Depth
Conductor 110' 20" 72 c.f. 137' 137'
Surface 2616' 13-3/8" 3585 c.f. 4294' 3109'
Production 9465' 9-5/8" 1939 c.f. 9923' 7004'
RECEIVED
Perforation depth: measured Open Perfs 9552'- 9598', 9684' - 9702' [1~:~ [~ c~'~ ~ ~.001
' Gas C0~s C0m~issi0~
true vertical Open Perfs 6681' - 6720', 6793' - 6809' ^laska0~& ·
A~chor~e
Tubing (size, grade, and measured depth) 3-1/2" 9.2#, L-80 TBG @ 9387'. 3-1/2" 9.2# Tubing Tail to 9445'.
Packers & SSSV (type & measured depth) 7" x 3-1/2" Baker S-3 Packer @ 9387'.
3-1/2" HES 'X' Nipple @ 2218'.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation 11/23/2001
Subsequent to operation 12/02/2001
Representative Daily Avera.qe Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl
Well Shut-In
Casing Pressure Tubing Pressure
1466 886 432 GL 286
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil__X Gas_ Suspended m
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~ "~ '~'~~__u-~ Title: Borealis Development Petroleum Engineer
Bruce W. Smith
Form 10-404 Rev 06/15/88 ·
Date December 18, 2001
Prepared by DeWayne R. Schnorr 564-5174
SUBMIT IN DUPLICATE
Z-101
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
10/27/2oo 1
11/06/2001
11/07/2001
11/20/2001
11/24/2001
11/26/2001
DRILL-POST WORK: HOT OIL IA TO THAW TBG
DRILL-POST WORK: THAW HYDRATES / PARAFFIN
DRILL-POST WORK: DUMMY GUN DRIFT
DRILL-POST WORK: FCO (PRE-ADDPERF)
DRILL-POST WORK: HEAT WELL BORE UP
DRILL-POST WORK: COMPLETED JEWELRY LOG & PERFORATED
EVENT SUMMARY
10/27/01
HOT OIL IA TO THAW TBG, TBG STILL PLUGGED. 640 BBLS OF 190' F CRUDE
PUMPED DOWN IA 1 BPM @ 2750 PSI.
11/06/01
MIRU SCHLUM. CTU #8. RIH W/2" DOWN-JET NOZZLE. TAG HYDRATE PLUG
@ 3,826'. CLEAN OUT W/60/40 METH TO 4,140' AND BREAK THROUGH. SET
DOWN IN STICKY MATERIAL (SUSPECT PARAFFIN) AT -4,700'. CALL FOR HOT
OIL UNIT. RI AND HOT OIL TUBING FROM SURFACE TO 9,445' (TUBING TAIL).
NO OBSTRUCTIONS. FREEZE PROTECT WELL W/CRUDE AND FLOWLINE W/
60/40 METH. ***NOTIFY PAD OPERATOR WELL IS TO BE LEFT SI FOR
ADDITIONAL WELL WORK.***
11/07/01
RAN 2.5 X 10' DUMMY GUN W/TEL & TAG EOT @ 9417' SLM (ELMD= 9437' FOR
A + 20' CORR) CONT' IN HOLE & TAG TD @ 9642' SLM (9662' CORR). RAN 2"
PUMP BAILER W/TEL & TAG EOT @ 9420' SLM (ELMD= 9437' FOR A + 17'
CORR) CONT'IN HOLE & TAG TD @ 9649' SLM (9666' CORR). - SAMPLE OF
FRAC SAND WELL LEFT SHUT IN
11/20/01
RIH WITH 2.4" JS NOZZLE. TAG FILL AT 9660' CTMD. CLEAN OUT FILL TO
9824' CTM (HARD BOTTOM). CHASE ALL FILL OOH, TURN WELL OVER TO
FILTERED NON-SLICK 2% KCL WITH 4000' TVD DIESEL CAP IN PREP FOR
UPCOMING PERFS. FP FLOWLINE WITH 60/40 MW. ***LEFT WELL SHUT-IN
FOR PERF JOB***
11/24/01
HEATED WELL BORE UP WITH 340 BARRELS OF 180' CRUDE. LINE GAS LIFT
UP TO CYCLE DOWN FLOWLINE.
11/26/01
COMPLETED JEWELRY LOG & PERFORATED 18' INTERVAL (8684' - 9702')
WITH 2-1/2" P J, 6 SPF, RANDOM ORIENTATION, 60 DEG PHASED GUN.
WARMED IA & TBG WITH HOT CRUDE PRIOR TO SHOOTING. POPPED WELL,
PUMPED 5 BBL MEOH PRIOR TO OPENING AL. SET UP TO HAVE MEOH
PUMPED FOR 12 HOURS. UNABLE TO HEAT AL LINE DUE TO LACK OF
INSULATION ON AL LINE.
FLUIDS PUMPED
BBLS
1
IPRESSURE TEST LUBRICATOR W/1 BBL OF DIESEL, (1 TESTS)
Page I
Z-101
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
24 METHANOL
300 60/40 METHANOL WATER
60 2& KCL WATER
477 EXTRA SLICK 2% KCL WATER
45 3# BIOZAN
48 DIESEL
1140 CRUDE
2050 TOTAL
ADD PERFS
11/26/2001
THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2-1/2" PJ, 6 SPF, RANDOM
ORIENTATION, 60 DEG PHASED GUN.
8694'-9702'
Page 2
i
STATE OF ALASKA ('
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of request: Abandon_ Suspend_ Operational shutdown _ Re-enter suspended well _
Alter casing_ Repair well _ Plugging _ Time extension _ Stimulate _
Change approved program _ Pull tubing _ Variance _ Perforate _X Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaska), Inc. Development_X RKB 82.0 feet
3. Address Exploratory_ 7. Unit or Property name
P. O. Box 196612 Stratigraphic__
Anchora~le, AK 99519-6612 Service_ Prudhoe Bay Unit
4. Location of well at surface ~' ,,/' ~' 8. Well number
721' FNL, 3013' FEL, Sec. 19, T11 N, R12E, UM (asp's 599659, 5959360) Z-101
At top of productive interval 9. Permit number / approval number
801' FNL, 1467' FEL, SEC 13, T11 N, R11 E, UM (asp's 596186, 5964516) 200-162 ~'
At effective depth 10. APl number
691' FNL, 1558' FEL, Sec. 13, T11 N, R11 E, UM (asp's 596094, 5964625) 50-029-22978
At total depth 11. Field / Pool
652' FNL, 1589' FEL, Sec 13 T11N, R11E, UM (asp's 596062, 5964663) Prudhoe Bay Field/Kuparuk River Oil Pool
12. Present well condition summary
Total depth: measured 9950 feet Plugs (measured)
true vertical 7029 feet
Effective depth: measured 9836 feet Junk (measured)
true vertical 6926 feet
Casing Length Size Cemented Measured Depth True vertical Depth
Conductor 110' 20" 72 c.f. 137' 137'
Surface 2616' 13-3/8" 3585 c.f. 4294' 3109'
Production 9465' 9-5/8" 1939 c.f. 9923' 7004'
RECEIVED
Perforation depth: measured Open Perfs 9552'- 9598' OCT 2 6 ~)001
true vertical Open Perfs 6681' - 6720' ^laska0il & Gas Cons. Commission
Anchorage
Tubing (size, grade, and measured depth 3-1/2" 9.2#, L-80 TBG @ 9387'. 3-1/2" 9.2# Tubing Tail to 9445'.
Packers & SSSV (type & measured depth) 7" x 3-1/2" Baker S-3 Packer @ 9387' MD.
3-1/2" HES 'X' Nipple @ 2218'.
13. Attachments Description summary of proposal __X Detailed operations program __ BOP sketch __
14. Estimated date for commencing operation 15. Status of well classification as:
October 28, 2001
16. If proposal was verbally approved Oil ~ X Gas ~ Suspended _
Name of approver Date approved Service
17. I hereby certify that the foregoing is true end--best of my knowl.edge. Questions? Call Bruce W. Smith @ 564-5093.
Signed Title: Borealis Development Petroleum Engineer Date October 26, 20.01
Bruce W. Smith Prepared by DeWa}~ne R. Schnorr 564-5174
FOR COMMISSION USE ONLY
--,
Conditions of approval: Notify Commission so representative may witness Approval no.
Plug integrity_ BOP Test__ Location clearance__ ~)1 '"' ,._,~-~'
Mechanical Integrity Test__ Subsequent form required 10- I.~,~,
_.. Approved by ..o.r.d.er of the Co..m..mission 0rigirlal Sign.d BY ................... Commissioner Date .... /
Cammy 0echsli /
/
Form 10-403 Rev 06/15/88 ·
ORIGINAL
SUBMIT IN TRIPLICATE
bp (
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P. O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
October 26, 2001
Tom Maunder
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, AK 99501
Dear Tom:
Re: Sundry Notice for Z-101 to Add Perfs (Kuparuk A Sands)
BP Exploration Alaska, Inc. proposes to perforate the Kuparuk A Sands to provide
additional information to allow recommendations to be made on the future utility of this
wellbore.
The procedure includes the following major steps:
Category IOR Step Description
S 200 1
P 200 2
E 200 3
S 200 4
Full bore drift w/dummy gun to PBTD,
Pump Heated Dead crude
Perforate 18' of A5, lowest shot 9702 MD
Static survey
Last Test:
Max. Deviation:
?¢r£s:
Min. ID:
Last TD tag:
Last Downhole Ops:
Latest H2S value:
Reference Log:
BHT & BHP:
June 2001, zero production test
60° @ 6201' mdDeviation at perfs:32°
9552-9578 MD
Four .... 2.813'.' at X nipples, see schematic
9836' MD based on tubing casing tally
Pull side pocket gauge 6/12/01
0 PPM 6/12/01
Schlumberger Platform express Jan 5, 2001
147° F & psia @ 3431'@6712 TVDSS
S-Line:
1. Slickline, full drift using 20-foot dummy perf gun to PBTD. Generic Gas lift is installed.
Pump:
2. Pump on annulus using dead crude, heat to its max temp (160-180 degf), limit rate since
circulation is through GLV. Displace full annulus and tubing with heated fluid.
Perforate xvell, Zone A5 from 9702-9684 MD, (6728-6712 TVDss). Perforate using
Schlumberger 2 1/2" HSD PJ, 2506 UP, 6SPF 60 degree phasing, oriented none. Tie-
into SWS Platform Express Log Jan 5, 2001. Max swell of 2.75-inch possible. Extra
care to leave gun above perfs but below tailpipe after shooting, shutting in well
allowing it to stabiliv, e. Once stable, pull gun through tailpipe at steady rate.
4. Flow well to cleanup perforations using warmed (looped) gas lift. Apply neat MEOH
to gas lift supply. (Critical, full wellbore must be wanned up prior to flowing well,
this well will hydrate off and must be "babied".)
5. Flow Test with maximum rate for +/-24 hours, take separator oil and gas samples for
API/WC/BSW/H2S analysis. (1 gal)
6. :Slickline:
1. Wait at least 24 hours for pressure build-up.
2. Obtain static reservoir pressure, run gauges w/two spun down MRT's.
3. Reservoir datum is 6600 TVD.
7. Leave well on production, well to be tested twice a month until permission to produce
expires (Tract Operations), Borealis Production Engineer will contact operations on
time and date.
Please call (Bruce Smith 564-5093, hm: 345-2948, cell: 440-8008) if there are any
questions.
Sincerely,
Bruce W. Smith
Greater Prudhoe Bay
Borealis Development Engineer
Re: Z-101 Add Perfs
S~ubjeC{: Re: Z-101 Add Perfs
Date: Fri, 26 Oct 2001 15:14:49 -0800
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Smith, Bruce W" <SmithBW@BP.com>
CC: John D Hartz <jack_hartz@admin.state.ak. us>, Bob Crandall <bob_crandall@admin.state.ak. us>
Bruce,
As we discussed, I am not fully knowledgeable with regard to tract operations
and I am a little gun-shy with that area. However, in this case you will be
perforating additional zones in the same formation. I think this is a key
distinction from the wells on L pad. There is also a tract agreement in place
for this well. Based on those facts, your request to add the A sand perfs is
acceptable. Please keep us informed with regard to the activities. Please
plan to submit a sundry regarding this request on Monday. Good luck, make oil.
Tom Maunder, PE
AOGCC
"Smith, Bruce W" wrote:
BP would like to add additional perforation into the well Z-101,
AP1#50-029-22978-00.
This well is currently under Tract operations. The original perforations
were in the C sands of the Kuparuk formation, these sands were frac'd.
Perf depths 9552-9578
These sands were not productive. Between 0 and 30 bbls of total production
over 24 hours. Well was shut-in and freeze protected while evaluating
future options. BP would like to add additional perfs in the Kuparuk A5
zone. Perf interval of interest are 9702.9684 MD (6728.6712 TVDss. There
is no plan at this time to frac this interval. If this zone is not
productive, it is planned to shut-in and freeze protect, while we
re-evaluate other uses for this wellbore.
Bruce W. Smith
BP Exploration (Alaska)
Western New Developments Engineer
PO Box 196612 MS 6-5
Anchorage AK 99519-6612
907-564.5093
Tom Maunder <tom maunder~,admin.state.ak, us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1 of 2 10/30/01 12:53 PM
t' STATE OF ALASKA 'Mi"
ALASKA U~L AND GAS CONSERVATION COM ~-.JlON
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revised: 06/06/01
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. -,.. ............... ..... 200-162
'~ ~. ':. C..",,'i' [~H~,'~
-3. Address .... ~ 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 ~,";"r;'~ ! 50-029-22978-00
4. Location of well at surface :--:-:..... .. ;.:,..~:'~.!. 9. Unit or Lease Name
722' SNL, 1938' EWE, SEC. 19, T11N, R12E, UM -' ' Prudhoe Bay Unit
At top of productive interval :::' ..,~-,'/~.,. '~,,~:~ ....................
4626' NSL, 1589' WEL, SEC. 13, T11 N, R11 E, UM (: Z-101
: 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation'and Sedal No. 11. Field and Pool
Prudhoe Bay Field / Kup;ru,~
KBE = 81.80' ADL 028245 _.~1~.~
12. Date Spudded 113. DateT. D. Reached114. Date Comp., Susp., or Aband. 115. Water depth, ifoffshore 116. No. of Completions l
12/15/2001 1/4/2001 4/23/2001 N/A MSL I One
17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)
9950 7029 FTI 9836 6926 FT [] Yes [] No (Nipple) 2218' 1900, (Approx.)
22. Type Electdc or Other Logs Run
MWD, GE, RES, DEN, NEU, CMR, Sonic, RFT, Percussion Sidewall Cores, CCL, Temp, MET
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 109' 30" 260 sx Arctic Set (Approx.)
9-5/8" 40# L-80 28' 4294' 12-1/4" 689 sx Articset Lite 3, 329 sx 'G'
7" 29# L-80 26' 9923' 8-3/4" 618 sx Class 'G'
,
, , ,
24. Perforations pp. en to. Producti.on (M.D+.TVD of Top and 25. TUBING RECORD
Bottom and ~nterval, s~ze an(] numDer}
SIZE DEPTH SET (MD) PACKER SET (MD)
2-1/2" Gun Diameter, 4 spf 3-1/2", 9.3#, L-80 9445' 9387'
MD TVD MD TVD
9552' - 9578' 6681' - 6703'
9572' - 9598' 6698' - 6720' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9552' - 9598' Hydraulic Fracture with 32,672 lbs behind
pipe of 20/40 mesh ceramic proppant
Freeze Protected with 100 bbls of Diesel
27. PRODUCTION TEST
Date First Production i Method of Operation (Flowing, gas lift, etc.)
May 20, 2001 Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-aBE GAS-MCF WATER-aBE CHOKE SIZE I GAS-OIL RATIO
5/20/2001 4 TEST PERIOD 34 136 270 176I 4012
Flow Tubing Casing Pressure CALCULATED OIL-aBE GAS-MCF WATER-BBL OIL GRAVITY-APl (CORE)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
See attached.:i'~,!i'?? '.~':.?i::~ '~i ';'~' !~ :''!': .;!ii "!=?' ;,;::
".~_ ,, .,, ,,!,.,. .. !: ~
,~ ~,'[ir'"~ I' ]'r" r'l',l-
Form 10-407 Rev. 07-01-80 Submit In Duplicate
[ )NFI,DENIlN.
29. Geologic Markers 30. Formation Tests
·
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
Top of Schrader Bluff 6336' 4179'
Base of Schrader Bluff 7393' 4895'
Top HRZ 9250' 6424'
Base HRZ 9454' 6598'
Kuparuk D 9540' 6671'
Kuparuk C 9554' 6683'
Kuparuk B 9609' 6729'
Kuparuk A6 9668' 6779'
Kuparuk A5 9682' 6791'
Kuparuk A4 9706' 6812'
Miluveach 9755' 6854'
31. List of Attachments: ' Summary of Post-Rig Work '
,
:32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble.,~~.~ ~ Title TechnicalAssistant Date
Z- 101 200-162 Prepared By Narne/Nurnbec Terrie Hubble, 564.4628
Well Number Permit No. /Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Inject on~,Shbt- ,~, (~th~r~piain.
ITEM 28: If no cores taken, indicate 'none'.
.
Form 10-407 Rev. 07-01-80
Z-101 {
DESCRIPTION OF WORK COMPLETED
POST RIG DRILLING OPERATIONS
Date Event Summary
CONFIDENTIAL
4/19/2001-
4/21/2001:
4/22/2001:
4/23/2001:
5/07/2t}01:
5/09/2001:
5/10/2001,:
5/11/2001:
Pulled ball & rod f/RHC Plug @ 9409' SLM. Installed generic GLV design. Tagged
PBTD @ 9782' SLM.
Underbalanced tubing. Pmnped 50 bbls of MEOH down IA.
MIRU ELU. PT'd equip to 3000 psi. RIH w/perf guns & tagged PBTD @ 9820'.
Logged well w/GR/CCL/Temp/MRT & POOH. RIH & shot 26' of initial perforations
from:
9552' - 9578' MD (Zone Kuparuk 4CB) Ref Log: SWS Platform Express 1/05/2001.
Used 2-1/2" carriers & all shots @ 4 SPF, orientated 90° off low side, underbalanced
press, & 180° phasing. POOH w/guns - ASF. RD ELU (more perfs to follow at latter
date).
Loaded IA w/5 bbls MEOH, followed by 147 bbls of Seawater, followed by 51 bbls
Diesel. Pumped 13 bbls of Seawater down tubing - tubing locked up. Pumped 1 '17
bbls Diesel down IA for FP.
MIRU CTU & PT'd equip. RIH & jetted through ice to PBTD @ 9820' CTM. PUH to
9500'. Performed injection test - 0.2 bpm @ 2150 psi, bled off 350 psi alter 5 min.
POOH w/CT.
MIRU SLU. Performed GLV work.
Completed GLV work. Tagged PBT.D @ 9834' SLM. PT'd IA to 4000 psi - passed.
RD SLU. MIRU ELU. PT'd equip. RIH w/perf guns & shot 26' of perforations '1'7:
9572' - 9598' MD (Zone Kuparuk C4B)
Used 2-1/2" carriers & all shots @ 4 SPF, orientated 90° off low side, balanced press,
& il 80° phasing. POOH w/guns - ASF. RD ELU.
MIRU. PT'd equip. Performed a FB Hydraulic Fracture Treatment using 20/40 mesh
ceramic proppant through the open perforations from:
9552' - 9598' MD (Kuparuk Zone C4B)
Pumped:
(a) 1.20 bbls 20# Gelled Pre-Pad @ 25 bpm, followed by shutdown. ISIP = 2128 psi.
(b) 50 bbls 40# Crosslinked Gelled Pad @ 25 bpm, followed by
(c) 20 bbls I ppg Scour Stage @ 25 bpm, followed by
(d) 130 bbls Flush @ 25 bpm, followed by
(e) Shutdown. ISIP = 2050 psi.
Resumed pumping Datafrac Treatment:
(1') 45 bbls 40# Crosslinked Gel @ 25 bpm, followed by
(g) 93 bbls 20# Linear Gel Flush @ 25 bpm, followed by
(h) Shutdown. ISIP = 2328 psi.
Page 1
Z-101
DESCRIPTION OF WORK COMPLETED
POST RIG DRILLING OPERATIONS
Date Event Summary
5/12/2001:
5/13/2001:
5/14/2001:
5/17/2001:
5/18/2001:
5/20/2001:
5/23/2001:
OI IDENTIAL
Resumed pumpin~ Frac Treatment:
(i) 55 bbls 40g Crosslinked Pad @ 25 bpm, followed by
(j) 191 bbls Crosslinked Slurry @ 25 bpm w/proppant stages @ 1-10 ppg, followed by
(k) 81 bbls Flush @ 25 bpm, followed by
(1) Shutdown. ISIP = 2224 psi
Underdisplaced by 5 bbls leaving 855 lbs in wellbore. Placed a total of 32672 lbs of
proppant behind pipe. Max proppant concentration placed was 8 ppg. FP'd well. RD.
MIRU SLU. RIH & tagged fill @ 9667' SLM. Ran new GLV design.
Completed new GLV design installation. RD SLU.
Warmed IA w/hot Diesel.
Attempted to thaw ice plug in tubing.
MIRU CTU & APC Sepm'ator. PT'd equip. RIH w/CT & jetted hydrates w/hot Crude
f/1850' to 5350' CTM. Pumped 100 bbls Hot Diesel down IA. APC Separator
flowing back. RD CTU.
Performed 4 hr production test: Oil = 36 bpd, Water = 270 bpd, FG = 122 MSCFD,
FM GOR = 3389, FTP = 260 psia.
Sampled well.
Page 2
ALASKA OIL AND GAS
CONSERVA~ION CO~SSION
TONY KNOWLES, GOVERNOR
333 W. 7TM AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
May 17, 2001
Gordon Pospisil
Team Leader, GPB West End Development
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Subject: PBU Tract Operation, ADL 028245 Z-101, Kuparuk Formation
Dear Mr. Pospisih
The Commission received your letter dated February 21, 2001, requesting permission to
commingle undefined pool production from the Kuparuk formation with fluids from the Prudhoe
Pool IPA. Your request is for surface commingling only and states there will be no downhole
commingling of formation fluids from the formations comprising the Prudhoe Pool. Commingling
will take place as the produced fluids from Z-101 are transported to PBU gathering facilities. In
addition to commingling, you have requested a waiver from the gas-oil ratio limitations of 20 AAC
25.240 for the duration of the evaluation, up to one year.
The Commission approves your request for surface commingling contingent on the following
conditions for a period of up to one year or as limited by the Division of Oil and Gas Tract
Operation permit. Production from Z-101should be reported separately to the Prudhoe Bay Field,
Kuparuk River Pool, pool number 640140, for those months the well is tested. Allocation
procedures agreed with the Division of Oil and Gas will suffice for production reporting during the
evaluation period. At least two well tests per month are required for commingled production
allocation.
,
Our understanding is that BPX will be gathering fluid samples for PVT analysis, conduct pressure
tests and monitor GOR performance as part of the surveillance activity for this project. We are
interested in the PVT properties and pressure performance and would appreciate a review of the
results when the evaluation is complete or as the data is gathered.
We look forward to hearing results of this test. If there any questions, contact Jack Hartz at 279~
1433 ext. 232.
Sincerely,
Alaska Oil & Gas Conservation Commission
Copy: Mark Myers, DNR/DOG
Dan Dickinson, DOR
Z101-PbuKRPoolTractCommingle,doc
3/21/01
Schlumberger
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATrN: Sherrie
NO. 1097
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Borealis
Well Job # Log Description Date Color Sepia BL CD
[-101 21039 PEX,AIT, BHC,CMR,RFT, NGT,DEQ 010501 1
-101 21039 PEX-AIT 010501 1 1
Z-101 21039 IBHC 010501 1 1
Z-101 21039 PEX-CNL3 DET DENSITY 010501 1 1
*Note- This is the REDO
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc,
Petrotectnical Data Center LR2-1
900 E Benson Bivd,
Anchorage AK 99508-4254
RECEIVED
HAR 2 3 2001
Date Delivered:
Alaska Oil & Gas Coos. Commiss~
Schlumberger DCS
3940 Arctic BIvd Suite 300
Anchorage AK 99503-5789
A1ZN: Sherrie
Schlumberger
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
AI'rN: Sherrie
NO. 999
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
2/21/01
Field: Borealis
Well Job # Log Description Date Color Sepia BL CD
P~'-101 21060 CMR PROCESSING 011001 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
RECEIVED
Date Delivered:
Ai~ska Oil & Gas Cons. Commissio~
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
AlffN: Sherrie
Received~ ~
Schh berger
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
All'N: Sherrie
NO. 1025
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
2/27/01
Field: Borealis
Well Job # Log Description Date Color Sepia BL CD
Z-101 21039 PEX,AIT,BHC,CMR,RFT, NGT,DEQ 010501 1
Z-101 21039 PEX-AIT 010501 1 1
Z-101 21039 BHC 010501 I 1
Z-101 21039 PEX-CNL3 DET DENSITY 010501 1 1
Z-101 21039 CEMENT HOLE VOLUME 010501 1 1
Z-101 21039 PEX-SSTVD 010501 1 1
Z-101 21039 NGT 011001 1 1
Z-101 21039 CMR 011001 1 1
Z-101 21039 RFT 011001 1 I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
RECEIVED
Date Delivered:
MAR 2 2001
Alaska 0il & Gas Cons. Commissi~
Artchora!~e
Schlumberger DCS
3940 Arctic BIvd Suite 300
Anchorage AK 99503-5789
Al-TN: Sherrie
Received
Schhunberger
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-$711
ATI'N: Sherrie
NO. 1025
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
2/27/01
Field: Borealis
Well Job # Log Description Date Color Sepia BL CD
Z-101 21039 PEX,AIT, BHC,CMR,RFT, NGT, DEQ 010501 1
Z-101 21039 PEX-AIT 010501 1 1
Z-101 21039 BHC 010501 1 1
Z-101 21039 PEX-CNL3 DET DENSITY 010501 1 1
Z-101 21039 CEMENT HOLE VOLUME 010501 1 1
7'-101 21039 PEX-SSTVD 010501 1 1
Z-101 21039 NGT 011001 1 1
Z-101 21039 CMR 011001 1 1
Z-101 21039 RFT 011001 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
RECEIVED
Date Delivered:
MAR 2 2001
Naska 0il-& Gas Cons, Comm~lor,
Anchoraoe
Schlumberger DCS
3940 Arctic BIvd Suite 300
Anchorage AK 99503-5789
A1ZN: Sherrie
..... STATE OF ALASKA
ALASKA(',.,,L AND GAS CONSERVATION COMM(,..,~ION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
,,
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Nar~e of Operator 7. Permit Number '
BP Exploration (Alaska) Inc. 200-162
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22978-00
,
4. Location of well at surface 9. Unit or Lease Name
722' SNL, 1938' EWL, SEC. 19, T11N, R12E, UM Prudhoe Bay Unit
At top of productive interval
4478' NSL, 1467' WEL, SEC. 13, T11N, R11E, UM
At total depth 10. Well Number
4626' NSL, 1589' WEL, SEC. 13, T11N, R11E, UM Z-101
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool
Prudhoe Bay Field / lO--Pool
KBE =81.80' ADL 028245
12. Date Spudded 12/15/2001 113' Date T'D' Reached 114' Date cOmp'' Susp'' Or Aband' 1/4/2001 } 15. Water depth, if offshore N/A MS L I116' N°' °f C°mpleti°ns One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost
9950 7029 ETI 9836 6926 FTI [] Yes [] NoI (Nipple) 2218' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, RES, DEN, NEU, CMR, Sonic, RFT, Percussion Sidewall Cores
, ,,
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP . BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 109' 30,, 260 sx Arctic Set (Approx.) "
9-5/8" 40# L-80 28' 4294' 12-1/4" S89 sx Articset Lite 3, 329 sx 'G'
....... 7,, 29# L-80 26' 9923' ' 8.3/4,, 318 sx Class"G' ...
241 Perforations open t'o' ~roductior~' ('aD+T'VD"0f T0p'~nd' ' ' ~'5'. ............... TuBiNG' REcoRD ................
Bottom and interval, size and number) ..... SIZE DEPTH SET (MD) PAcK'i=R' sE:'r '(MD)
None ' 3:i/2", 9.3#,'L'-"80 ........... 9'445'~ ..... 9387' ' '
MD TVD MD TVD ..........
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 65 Bbls of Diesel
,
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Not on Production Pending Tract Operation Approval: To Tie-In, Perforate and Produce
Date of Test Hours Tested PRODUCTION FOR OIL'BBL GAS'MCF WATER-BBL CHOKE SIZE ] GAS-OIL RATIO
I TEST PERIOD
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS'MCF WATER'BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. ' " CORE DATA ' "
Brief description of lithology, Porosity, fractures, apparent dips and presence of oil, gas or water. 'Submit core chips. ""
See attached. RECEIVED
MAR 0 1 2001
Alaska Oil & Gas Cons. Commission
Anch,o, rage
Form 10-407 Rev. 07-01-80
ORIGINAL
Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
Top of Schrader Bluff 6336' 4179'
Base of Schrader Bluff 7393' 4895'
Top HRZ 9250' 6424'
Base HRZ 9454' 6598'
Kuparuk D 9540' 6671'
Kuparuk C 9554' 6683'
Kuparuk B 9609' 6729'
Kuparuk A6 9668' 6779'
Kuparuk A5 9682' 6791' RECEIVED
Kuparuk A4 9706' 6812'
Uiluveach 9755' 6854' J~'/~ ~
Alaska Oil & Gas Cons. Commission
Anchorage
31. List of/i, ttacl~m'ents: Summary of Daily Drilling R~ports, Core Description', Surveys'(submi{ied 'by vendori ..................................
32. i hereby certify that the foregoing is true and correct to the best of my knowl"edge
Signed Terrie Hubble ~""~ ~ Title Technical Assistant Date
Z- 101 200-162 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
~NSTRUCTIONS
GENERAL.' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
BPX Exploration, Alaska
Z-101 Well
Core Description
Prudhoe Bay Field
Core #1: cut 40'(9537'-9577'), recovered 37.4'. Inclination of well bore was 32 degrees
from vertical.
9537'-9552': Shale, medium to dark gray, fissile, becomes glauconitic and pyritic in the
lower part (below 9545').
9552'-9556': Sandstone, light to dark gray, slightly to very glauconitic, dominantly very
fine grained, poorly sorted, abundant silica and siderite cement, low porosity, scattered
oil stain and fluorescence.
9556-9568': Sandstone, dark gray, slightly glauconitic, common carbonaceous material,
dominantly medium grained, poorly sorted, abundant silica and siderite cement, little or
no porosity and permeability, no fluorescence or oil stain. Silt content increases
downward. Interval includes a few fractures, which were bleeding oil.
9568'-9574.4': Sandstone, dark greenish gray, very glauconitic (30%), very fine to very
coarse grained, poorly sorted, abundant silica and siderite cement, low porosity and
permeability, spotty brown oil stain and fluorescence.
Core #2: cut 22' (9577'-9599'), recovered 22'. Inclination of well bore was 32 degrees
from vertical.
9577-9582': light to medium grayish, greenish brown, slightly to moderately glauconitic,
coarse grained, decreasing downward to medium grained, moderately well sorted,
cOmmon silica and siderite cement, poor to fair porosity, poor permeability, scattered
brown oil stain and fluorescence. Leached shell fossils at 9581.5.
9582-9599': medium grayish brown, mostly moderately glauconitic (5-30%), becoming
less glauconitic downward, very fine to medium grained, moderately sorted, poor to fair
porosity, low permeability, brown oil stain and fluorescence; nearly uniform, slightly
spotty and scattered oil stain and fluorescence.
Core #3: 9599'-9637' (cut 38', recovered 34'). Inclination of well bore was 32 degrees
from vertical.
9599'-9610': light to med grayish brown to brown, slightly to very glauconitic (5-30%,
mean 15%), medium grained, moderately sorted, mostly low porosity and permeability,
with good to excellent porosity and permeability in lowest 1-2 feet, even to mottled oil
stain and fluorescence (excellent stain and fluorescence in basal 1-2').
RECEIVED
Alaska Oil & Gas Cons. Commission
Anchorage
9610-9633: thin layers of very dark brownish gray shale, hard, fissile, and slightly
micaceous, alternating with thin layers of medium brown sandy siltstone, fair porosity,
probable low permeability, ripple to planar laminated, uniform brown oil stain with
uniform fluorescence. Very similar throughout interval. Open slickensided fracture at
9610-9612', with oil in fracture.
Core #4: 9637'-9657.5'. Cut 20.5', recovered 20.5'. Well bore inclination 32 degrees
from vertical.
9637'-9757.5': thin layers of very dark brownish gray shale, hard, fissile, and slightly
micaceous, alternating with thin layers of medium brown sandy siltstone, fair porosity,
probable low permeability, ripple to planar laminated, uniform brown oil stain with
uniform fluorescence. Very similar throughout interval.
RECEIVED
MAR 0 I 2001
Alaska Oil & Gas Cons. Commission
Anchorage
Legal Name: Z-101
Common Name: Z-101
;: ::;: ;;:SUrfaCe PressUre Leak Off Pressure (BHP) EMW
12/21/2000 FIT 4,294.0 (ft) 3,109.0 (ft) 9.00 (ppg) 566 (psi) 2,020 (psi) 12.50 (ppg)
-' ~
g
Printed: 2/1512001 3:23:44 PM
· (' ( RECEIVED
BP EXPLORATION MAR 0 1 Z001Page 1 of 9
Operations Summary ReportAlaska0il & Gas Cons. Commission
Anchorage
Legal Well Name: Z-101
Common Well Name: Z-101 Spud Date: 12/15/2000
Event Name: DRILL+COMPLETE Start: 12/13/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 7ES Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
12/14/2000 05:00 - 16:00 11.00 RIGU PRE Rigged down from Z-21A. Made derrick up move, well to well in same
row with 90 stands drill pipe in derrick. Rigged up. Had previously
installed drilling spool on 20" conductor and nippled up 21 1/4" diverter
spool and annular preventer.
16:00 - 00:00 8.00 BOPSUR :SURF Took water into pits. Filled pits with spud mud. Began installing 20"
riser on diverter. Loaded HWDP and 8" directional tools into pipe shed.
12/15/2000 00:00 - 05:30 5.50 BOPSUI; ISURF Finished installation of drill nipple. Function tested 21 1/4" diverter
system - OK.
05:30 - 06:30 1.00 DRILL I SURF Picked up 21 joints 5" HWDP and stood in stands.
06:30 - 07:00 0.50 DRILL SURF Held pre-spud meeting with drilling crew. Held diverter drill.
07:00 - 09:30 2.50 DRILL SURF Picked up and made up directional drilling BHA #1.
09:30- 13:00 3.50 DRILL SURF Drilled 12 1/4" surface hole from 109 ft. to 225ft. AST-2 hrs.
13:00 - 13:30 0.50 DRILL SURF POOH to top of mud motor.
:13:30 - 14:00 0.50 DRILL SURF Picked up MWD tool and jars.
114:00-15:00 1.00 DRILL SURF Drilled to 244 ft. ART-1/4hr.
15:00 - 17:30 2.50 DRILL SURF Circulate and condition mud and build volume.
17:30 - 00:00 6.50 DRILL SURF Directionally drilled from 244 ft. to 549 ft. AST - 3 hrs. ART- 1 hr.
12/16/2000 00:00 - 06:00 6.00 DRILL SURF Directionally drilled to 858 ft. ART - 1 hr.; AST - 3 hrs.
06:00 - 08:00 2.00 DRILL SURF Pulled bit into conductor casing at 100 ft. while changing top drive
connector to drill pipe thread. Had to back ream at 612 tt., 581 ft. and
458 ft.
08:00 - 10:00 2.00 DRILL SURF Changed top drive connector to 4" HT40 thread.
10:00 - 11:30 1.50 DRILL SURF RIH with bit. to 768 ft.
11:30 - 12:00 0.50 DRILL SURF Washed and reamed 768 ft. to 858 ft.
12:00 - 00:00 12.00 DRILL SURF Directionally drilled from 858 ft. to 1280 ft. AST - 8 hrs.; ART - 1 hr.
12/17/2000 00:00 - 22:00 22.00 DRILL SURF Directionally drilled 12 1/4" hole to 2640 ft. AST - 10.5 hrs. ART - 5 3/4
hrs.
22:00 - 23:00 1.00 DRILL SURF Circulate bottoms up.
23:00 - 00:00 1.00 DRILL SURF POOH for wiper trip from 2640 ft. to 956 ft. Had 15K overpull at 2018 ft.
12/18/2000 00:00 - 01:30 1.50 DRILL SURF Finished POOH to bit. Bit in excellent condition (1/1).
01:30 - 02:00 0.50 DRILL SURF Cleared floor prep. to cut drill line.
02:00 - 03:00 1.00 DRILL SURF Slipped and cut 92 ft. drill line.
03:00 - 03:30 0.50 DRILL SURF Serviced top drive.
03:30 - 04:30 1.00 DRILL SURF RIH to 2640 ft. to complete wiper trip. No problems while RIH. No fill.
04:30 - 00:00 19.50 DRILL SURF Drilled 12 1/4" surface hole from 2640 ft. to 4163 ft. AST - 2 hrs.: ART -
10 3/4 hrs.
12/19/2000 00:00 - 03:00 3.00 DRILL SURF Drlg From 4163 to 4314 ART 1.75, Up Wt 115, SO 80, Rt 95, WOB
25-30, 60 RPM, 6-8 TQ, 2530 PSI @ 83 SPM
03:00 - 04:00 1.00 DRILL 'SURF CBU
04:00 - 08:00 4.00 DRILL :SURF POH From 4314 to 180', SLM, Tite 1840-1782, 25K Overpull,
Backreamed & Circ F/690-685, Wiped Clear
,08:00 - 10:00 2.00 DRILL SURF RIH F/180 to 4314, Took Wt (25K) @ 1210 & 1784
10:00 - 15:30 5.50 DRILL SURF Circ & Condition Mud; Pump Sweep Around; Add TorqueTrim & Lubtex,
REDUCE Visc to 120 sec/qt
15:30 - 19:00 3.50 DRILL SURF Drop ESS & POH, Tite @ 1943
19:00 - 21:00 2.00 DRILL SURF L/D BHA
21:00 - 22:00 1.00 DRILL SURF Clean & Clear Floor
22:00 - 23:00 1.00 CASE SURF M/U Mandrel CSG Hanger on Landing Joint, Make Dummy Run through
Diverter Spool, Pull & L/D in Pipe Shed
23:00 - 00:00 1.00 CASE SURF R/U 9 5/8 CSG Tools
12/20/2000 00:00 - 06:00 6.00 CASE SURF Run 9 5/8" 40# L80 BTC R3 CSG to 2130, Tagged Hard Bridge
06:00 - 07:00 1.00 CASE SURF Circ & Work CSG Thru Hard Bridge @ 2130
07:00 - 10:00 3.00 CASE SURF Finish Running 105 Jt 9 5/8 40# LB0 BTC R3 CSG to 4294
.
Printed: 1/26/2001 4:35:42 PM
RECEIVED
BP EXPLORATION MAR 0 '] Z001 Page 2 of 9
Operations Summary ReportAlaskaOil & Gas Cons. Commission
Anchorage
Legal Well Name: Z-101
Common Well Name: Z-101 Spud Date: 12/15/2000
Event Name: DRILL+COMPLETE Start: 12/13/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 7ES Rig Number:
Sub
Date From -To Hours Task Code Phase Description of Operations
12/20/2000 10:00 - 11:00 1.00 CASE SURF PJD Franks Circ & Wash Tool, PJU Dowel CMT Head
11:00 - 13:00 2.00 CASE SURF Circ & Reciprocate 165K Up 85K Down PJSM
13:00 - 16:30 3.50 CASE SURF Mix & Pump 75 BBL MudPush Spacer @ 10.4 ppg, Drop Bottom Plug,
Mix & Pump 544 BBL, 689 sx Articset Lite 3 @ 10.7 ppg, Tailed with 68
BBL, 332 sx G @ 15.8, Drop Top Plug, Displace with Rig Pump,
Continue to Reciprocate Until 175 BBL Lead Past Shoe, 200 BBL CMT
to Surface, Bumped Plug to 3500, Floats Held, Full Returns, CIP 1630
Hrs 12/20/00
16:30 - 20:00 3.50 CASE SURF Clear Floor, L/D Landing Joint
20:00 - 00:00 4.00 CASE SURF N/D Bell Nipple, Annular Preventer, Dirverter Spool
12/21/2000 00:00 - 02:00 2.00 WHSUR SURF N/D Bell Nipple, Annular, & Diverter Spool
02:00 - 03:30 1.50 WHSUR SURF N/U CSG Head & TBG Spool; FMC Tested 1000
03:30 - 09:00 5.50 BOPSUR SURF N/U BOP, Install 2nd Annulus Valve on CSG Head
09:00 - 10:00 1.00 BOPSUR 'PROD1 M/U Test Jt, Set Test Plug
10:00 - 16:00 6.00 BOPSUR PROD1 Test BOP; All Lines, Rams, Valves, Manifold, Witnessed By John
Crisp, AOGCC
16:00 - 17:00 1.00 BOPSUR PROD1 Pull Test Plug; Set Wear Bushing
17:00 - 17:30 0.50 DRILL !PROD1 Calibrate Sperry Sun Depth Counter
17:30 - 20:30 3.00 DRILL . PROD1 P/U BHA #2, Load MWDs
20:30 - 21:30 1.00 DRILL ' PROD1 Pick Up 30 Jts 4" DP
21:30 - 23:30 2.00 DRILL . PROD1 RIH (MWD Check Shot @ 2300') Tag Cmt @ 4182, Break Circ
23:30 - 00:00 0.50 DRILL PROD1 Test CSG to 3500 for 30 Min
;12/22/2000 00:00 - 02:30 2.50 DRILL PROD1 DRLG CMT 4182-4208, DRLG FC, CMT, FS, CMT, Clean Out Rathole,
DRLG 20' New Formation to 4334
02:30 - 03:00 0.50 DRILL PROD1 Finish Displace Spud Mud to 9.0 ppg 4% KCL Mud @ 12 BPM, Pull Into
CSG
03:00 - 03:30 0.50 DRILL PROD1 Perform FIT of 12.5 EMW; 566 psi, 9.0 ppg Mud, 3109 'I'VD
03:30 - 23:00 19.50 DRILL PROD1 Directional DRLG to 6265, Had One Overpull @ 4797-4811, Swept
Hole WNVeighted (12 ppg) Hi Visc Pills, Saw 30-50% Increase in
Returns, Fought Mud Weight Increases with Additions of KCL Brine,
Fine Tune Shaker Screen Sizes, Maintain ECD @ > 1 ppg Over Mud
Weight, Increased Flow Rate to 600 gpm for Hole Cleaning, AST 2.5,
ART 10.5, WOB 5-20, RPM 50-80 TQ 5K Off, 9-10K On, !50K Up, 85K
Down, 110K Rt, SPM 200 @ 2060 off, 2350 On, ROP 190-200 Ft/Hr
23:00 - 00:00 1.00 DRILL PROD1 CBU, Prep to Short Trip to Shoe
12/23/2000 00:00 - 00:30 0.50 DRILL PROD1 Finish CBU
00:30 - 03:00 2.50 DRILL PROD1 POH 21 Stds to CSG Shoe; 25K Pull @ 5800', Proper Hole Fill
03:00 - 03:30 0.50 DRILL PROD1 PJSM; Service TD
03:30 - 05:00 1.50 DRILL PROD1 RIH, No Problems
05:00 - 00:00 19.00 DRILL PROD1 Drlg, Attempt to Slide to Drop Angle, Motor Stalling Out, Added
Stickless Beads @ 6374 (20 bbl @ 30#/bbl, Spot & Attempt to Slide,
Little Success, After Consent, Added Slug of BDF 263 Lubricant @
6420', able to Slide Better, Continue to Add BDF 263 to 1%, Drlg to
6834, AST 10 ART 13.5 HRS
12/24/2000 00:00 - 13:30 13.50 DRILL PROD1 Directional Drill to 7384, AST 5.5, ART 2.5 Hrs, Ability to Slide
Improved by BDF 263
13:30 - 14:30 1.00 DRILL PROD1 Pump 20 BBL Weighted (3#/gal over) Visc Sweep Around, No Increase
in Returns Noted
14:30 - 15:30 1.00 DRILL PROD1 Wiper Trip from 7384-5520, 35K Overpull @ 6085 & 5738, Wiper
Through OK
15:30- 16:30 1.00 DRILL PROD1 RIH 5520-7384, No Problems
16:30 - 00:00 7.50 DRILL PROD1 Directional Drill from 7384-7943, ART 4.25 Hrs, Had 30K Overpull #@
7815, Backreamed OK PU 210K Down 98K 130K Rt, 80 Rpm, 14K Tor,
Printed: 1/26/2001 4:35:42 PM
RECEIVED
BP EXPLORATION MAR0 ~ ~10~e 3 of 9
Operations Summary Report Alaska Oil & Gas Cons. Commission
Anchorage
Legal Well Name: Z-101
Common Well Name: Z-101 Spud Date: 12/15/2000
Event Name: DRILL+COMPLETE Start: 12/13/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 7ES Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
12/24/2000 16:30 - 00:00 7.50 DRILL PROD1 552 gpm 3090 psi WeB 12-15K
12/25/2000 00:00 - 11:00 11.00 DRILL PROD1 Drlg 8.75" Hole to 8596, ART 6.25 Hrs, 240K Up, 96K Down, 138 K Rt,
537 gpm @ 2910/3200 psi, WeB 18-23K, Tq 13K off, 14K on
11:00 - 12:00 1.00 DRILL PROD1 Sweep Hole W/35 BBL, Low/Hi Visc Pill
12:00 - 18:00 6.00 DRILL PROD1 Pull Into Shoe; Tight @ 7809, 7465, 7210, (20-25K Over) 5275 (30-35K
Over) 45K Over @ 5010, Wash & Backream From 4917-4294 @ 101
Spm/500 psi
18:00 - 19:00 1.00 DRILL PROD1 Cut & Slip 105' Drlg Line, Adjust Brakes
19:00 - 19:30 0.50 DRILL PROD1 Service Top Drive
19:30 - 22:00 2.50 DRILL PROD1 Change Liners & Swabs, Both Pumps from 5.5" to 5"
22:00 - 00:00 2.00 DRILL PROD1 RIH F/4294-8596; Took Weight (25K) 4650-5630; Wiped Areas Clear
12/26/2000 00:00 - 00:30 0.50 DRILL PROD1 Pump Hi/Low Weighted Sweep to Help Clean Hole After Problematic
Trip
00:30 - 16:00 15.50 DRILL PROD1 Drlg to 8988, ART 11.75 Hrs, 242K Up, 95K Down, 140 Rt, Rpm 80, Tq
13-15K, 561 Gpm 3250/3450 psi, Web 10-20K, MW 9.7 ppg
16:00 - 16:30 0.50 DRILL PROD1 Replace Suction Lip Seal # 1 Mud Pump, Center Cylinder
16:30 - 00:00 7.50 DRILL PROD1 Drlg to 9183 MD, 6990 ']'VD, ART 5.75 Hrs, 245K Up, 105 Down, 150K
Rt, Rpm 80, Tq 12-13K, Web 15-18K 561 Gpm 3520/3850 psi, MW
10.3 ppg
12/27/2000 00:00 - 12:00 12.00 DRILL PROD1 Drlg to 9537 MD, 6668 TVD (Core Point) ART 9 Hrs, 245K Up,110K
Down, 152K Rt
12:00- 12:30 0.50 DRILL PROD1 Circ
12:30 - 14:00 1.50 DRILL PROD1 Sweep Hole with 13.3#/Gal 25 BBL Pill
14:00 ~ 17:00 3.00 DRILL PROD1 POH F/9537-4210; 40K Overpull @ 8140, Wiped Through OK, Minor
Overpulls @ 7995, 5785, 5800, Wiped Out OK
17:00 - 22:00 5.00 DRILL PROD1 Dump Mud System & Clean Pits, Take on Core Fluid
22:00 - 00:00 2.00 DRILL PROD1 RIH, Took Wt (25K) @ 5710-5760, Wipe Through Several Times, OK,
Continue in Hole
12/28/2000 00:00 - 00:30 0.50 DRILL PROD1 Finish RIH to 9537
00:30 - 05:00 4.50 DRILL PROD1 Pump 50 BBL Spacer, Followed by 10.3 ppg Coring Fluid @ 8.5
BBL/Min 2500 psi, Clean Possum Bellys, Pump Dry Job
05:00 - 07:30 2.50 DRILL PROD1 POH From 9537- 4200', Had One 30K Overpull @ 7343, Wiped Clear;
OK
07:30 - 09:30 2.00 DRILL PROD1 Finish POH
09:30 - 12:30 3.00 DRILL PROD1 PJSM, L/D BHA
12:30 - 13:00 0.50 DRILL PROD1 Clear & Clean Rig
13:00 - 13:30 0.50 DRILL PROD1 Pull Wear Bushing
13:30 - 17:30 4.00 DRILL PROD1 Set Test Plug, Test All Lines, Valves, Rams, Annular to 250 Low, 5 Min,
3500 Hi for 10 Min, State Waived Witnessing, Jeff Jones
17:30 - 18:00 0.50 DRILL PROD1 Set Wear Bushing
18:00 - 20:30 2.50 DRILL PROD1 PJSM, P/U Core Equip
20:30 - 00:00 3.50 DRILL PROD1 RIH for Core #1
12/29/2000 00:00 - 01:00 1.00 DRILL PROD1 RIH W/Core Bbl #1 to 9445
01:00 - 02:00 1.00 DRILL PROD1 Rotate & Reciprocate Pipe, Break Circ Slow, Rotary Stalled, Pull 65K
Over, Kill Pump, Pull 75K Over, Jar X2, Pipe Came Free
02:00 - 04:00 2.00 DRILL PROD1 Rotate & Reciprocate, Increase Pump Rate to 400 gpm, PP 400 225
Up, 110 Down, 155 Rotate Drop Ball, Take SPRs
04:00 - 00:00 20.00 DRILL PROD1 Cut Core # 1 From 9537-9579, Slow ReP, WeB 15-25K, 50-80 RPM,
10-12 Tq, 301gpm @ 1830 psi, Hrs on Core Head= 20
12/30/2000 00:00 - 00:30 0.50 DRILL PROD1 Terminate Core Due to No ReP, PU & Break Core w/10K Overpull
00:30 - 01:30 1.00 DRILL PROD1 POH F/9579-9090
01:30 - 05:00 3.50 DRILL PROD1 Pump Dry Job & POH F/9090-3026
05:00 - 06:00 1.00 DRILL PROD1 POH F/3026-1249 @ 3 Minute/Std as per Bp Core Recovery Protocol
Printed: 1/26/2001 4:35:42 PM
RECEIVED
0
1
9nnl
BP EXPLORATION ~-~'~e 4 of ~
Operations Summary Report ^laska Oil & Gas Cons. Commission
Anchorage
Legal Well Name: Z-101
Common Well Name: Z-101 Spud Date: 12/15/2000
Event Name: DRI LL+COMPLETE Start: 12/13/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 7ES Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
12/30/2000 06:00 - 07:30 1.50 DRILL PROD1 POH F/1249-412 @ 6 Minute/Std
07:30 - 08:00 0.50 DRILL PROD1 POH F/412-197 @ 15 Minute/Std
08:00 - 08:30 0.50 DRILL PROD1 PJSM, Recovering Core
08:30 - 09:00 0.50 DRILL PROD1 POH F/197-103
09:00 - 10:00 1.00 DRILL PROD1 Pull Inner Barrel, L/O Core (Recovered 37.4', cut 42'), Core Catcher
was Jamed, Core Head was Packed Off, 1" Diameter Piece of
Sandstone was in the Catcher
10:00 - 12:00 2.00 DRILL PROD1 P/U New Aluminum Inner Core BBL, Space Out, RR Same Core Head,
See Bit Grade
12:00- 13:30 1.50 DRILL PROD1 RIH W/Core BBL#2, BHA
13:30 - 19:30 6.00 DRILL PROD1 RIH to 9484, Filled Pipe @ 4208 & 7284
19:30 - 22:00 2.50 DRILL PROD1 CBU, Rotate & Reciprocate, Drop Ball & Circ Down, Take SPRs
22:00 - 00:00 2.00 DRILL PROD1 Tag Bottom @ 9577.2 (2' Core Debris/Rubble) Start Cutting Core # 2
12/31/2000 00:00 - 06:00 6.00 DRILL PROD1 Core To 9598, ADT 6 Hrs, ROP Slow
06:00 - 09:00 3.00 DRILL PROD1 Pump Dry Job & POH to 6967, Tight
09:00 - 09:30 0.50 DRILL PROD1 Attempt to Pull Through Tight Spot, Failed, Break Circ & Backream
Through Tight Spots to 6900, Kill Pump & Work Though Spots W/O
Pumps, OK
09:30 - 11:00 1.50 DRILL PROD1 POH F/6900-3026
11:00 - 15:30 4.50 DRILL PROD1 Continue POH & Rate Required for BP Core Recovery Protocol
15:30 - 16:00 0.50 DRILL PROD1 PJSM; Core Handling
16:00 - 18:30 2.50 DRILL PROD1 L/D Inner bbl & Core; Recovered 21.8'of Core, Replace Core Head,
Replace Inner Bbl (90')
18:30 - 19:30 1.00, DRILL PROD1 RIH W/BHA
19:30 - 21:00 1.50 DRILL PROD1 PJSM, Cut & Slip Drlg Line
21:00 - 21:30 0.50 DRILL PROD1 Service Top Drive
21:30 - 23:30 2.00 DRILL PROD1 Continue RIH W/Core Barrel # 3 to 4240
23:30 - 00:00 0.50 DRILL PROD1 Fill Pipe, Break Circ
1/1/2001 00:00 - 03:30 3.50 DRILL PROD1 RIH f/4240' - 9505'.
03:30 - 05:00 1.50 DRILL PROD1 Wash to 9598'. CBU while cond mud.
05:00 - 14:30 9.50 DRILL PROD1 Cored f/9598'-9637'. 95 rpm, 5-9K WOB, 305 gpm. Core bbl jammed,
ART=9 hrs
14:30 - 15:30 1.00 DRILL PROD1 Condition mud, prop dry job.
15:30 - 17:30 2.00 DRILL PROD1 POH, Had 50K Overpull @ 6985, Wiped Thru, Continue POH
17:30 - 18:00 0.50 DRILL PROD1 Flow Check @ Shoe
18:00 - 00:00 6.00 DRILL PROD1 Continue POH W/Core #3, Pull Slowly as per bp Core recovery Protocol
1/2/2001 00:00 - 01:00 1.00 DRILL PROD1 Finished POOH with core #3.
01:00 - 04:00 3.00 DRILL PROD1 Laid down 1 section of core outer core barrel and 2 inner core barrels.
Picked up 1 section inner barrel. Made up RR Core Bit #1 and spaced
inner barrel.
04:00 - 05:00 1.00 DRILL PROD1 Serviced rig and top drive.
05:00 - 11:00 6.00 DRILL PROD1 RIH with core barrel ~ to 9621 ft. w/o incident.
11:00 - 13:00 2.00 DRILL PROD1 Circulated bottoms up and took SPR pressures.
13:00 - 22:00 9.00 DRILL PROD1 Drilled rotary core from 9637 - 9657 ft. at average rate of 2.22 ft/hr.
ART - 9 hrs. Received orders from geologist to suspend coring
!operation due being below objective interval.
22:00 - 22:30 0.50 DRILL PROD1 Pumped 40 bbl. 13.3 ppg dry job. Broke off core with 20K.
22:30 - 00:00 1.50 DRILL PROD1 POOH to 6041 ft. w/o incident or overpulls.
1/3/2001 00:00 - 06:00 6.00 DRILL PROD1 Finished POOH with core barrel #4.
06:00 - 07:30 1.50 DRILL :PROD1 Laid down core. Recovered 20.5 ft. SHALE of 20.5 ft. cut. Laid down
core barrels. Bit condition 1/1.
07:30 -08:30 1.00 DRILL PROD1 Clear floor and loaded out coring equipment. Pulled wear ring.
Printed: 1/26/2001 4:35:42 PM
RECEIVED
BP EXPLORATION MAR 0 1 2001Page5of9
Operations Summary Report Alaska Oil & Gas Cons. Commission
Anchorage
Legal Well Name: Z-101
Common Well Name: Z-101 Spud Date: 12/15/2000
Event Name: DRI LL+COMPLETE Start: 12/13/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 7ES Rig Number:
Sub Phase Description of Operations
Date From-To Hours Task Code
1/3/2001 08:30 - 13:30 5.00 DRILL PROD1 Tested BOPE, safety valve, dart valve, standpipe, kelly hose, kelly
valves to 250 psi Lo/3500 psi Hi pressure per BP Amoco and AOGCC
requirements. Had previously tested choke manifold and kill lines while
POOH. Witness of test waived by John Crisp, AOGCC agent. Blind
rams would not hold test.
13:30 - 16:30 3.00' DRILL PROD1 Opened BOP blind/shear rams. Found lower seal cut. Replaced and
repaired blind/shear ram. Tested to 250/3500 psi.
16:30 - 17:00 0.50 DRILL PROD1 Pulled BOP test plug and installed wear ring.
17:00 - 20:00 3.00 DRILL PROD1 Made up directional drilling BHA with rerun PDC bit and straight PDM.
20:00 - 21:30 1.50 DRILL PROD1 RIH to base of surface casing.
21:30 - 22:30 1.00 DRILL PROD1 Filled drill pipe and CBU with mud pretreated with 3% drilling lubricant.
22:30 - 23:30 1.00 DRILL PROD1 RIH to 6260 ft. Sperry Sun depth encoder within drawworks clutch
housing broke leading to broken air control lines.
23:30 - 00:00 0.50 DRILL DATA PROD1 POOH to casing shoe to repair clutch air lines.
1/4/2001 00:00 - 01:30 1.50 DRILL DATA PROD1 Finished changing out Sperry Sun depth encoder on drawworks and
repairing air lines.
01:30 - 04:00 2.50 DRILL PROD1 RIH from surface casing to 9431 ft.
~04:00 - 06:30 2.50 DRILL PROD1 Ran MWD MADD pass log thru interval 9431 - 9627 ft.
06:30 - 07:00 0.50 DRILL PROD1 Logged, washed and reamed interval 9627 - 9657 ft.
07:00 - 11:45 4.75 DRILL PROD1 Drilled by rotating from 9657 ft. to 9950 ft. TD. ART - 3 hrs.
11:45 - 14:30 2.75 DRILL PROD1 Circulated 300% bottoms up at 550 gpm with 100 rpm rotary.
Recovered abundant cuttings.
14:30 - 17:30 3.00 DRILL PROD1 POOH with bit to surface casing for wiper trip. Had 40K overpulls at
7125', 7100' and 6985'. Worked rite spots dry. Possible evidence of
shallow keyseat at 6140 ft.
17:30 - 18:30 1.00 DRILL ' PROD1 Slipped and cut drill line. Checked top drive booster motor and
adjusted drawworks brakes.
18:30 - 21:00 2.50 DRILL PROD1 RIH to 9950 ft. to complete wiper trip.
21:00 - 00:00 3.00 DRILL PROD1 Circulated and conditioned mud. Pumped 50 bbl Hi vis sweep and
recovered abundant cuttings. Pumped second sweep. Circulated at
550 gpm, with 100 rpm rotary.
1/5/2001 00:00 - 00:30 0.50 DRILL PROD1 Pump dry job.
00:30 - 05:30 5.00 DRILL PROD1 POOH to BHA.
05:30 - 06:30 1.00 DRILL PROD1 Laid down directional tools and cleared floor.
06:30 - 07:00 0.50 EVAL PROD1 Held PJSM with SWS and Nabors crew.
07:00 - 08:00 1.00 EVAL PROD1 Rigged up SWS and made up Platform Express logging tool string.
08:00 - 11:30 3.50 EVAL PROD1 RIH running Induction, Gamma Ray, Sonic and Neutron logs on trip in
hole. Schlumberger TD - 9945 ft. Ran repeat section log TD - 9400 ft.
Had slight overpull in Kaparuk Sand at 9600 ft. Ran tools back to TD
and began logging run. Tools hung with bottom of string at 9620 ft.
Collapsed caliper arms and tools jumped to 9612 ft. then stuck.
11:30 - 15:30 4.00 EVAL KEYS PROD1 Worked SWS line to 9500 lbs. maximum line pull while waiting on
fishing tools. Line stretch calculations indicating line stuck at 7000 ft.
+/-. Load cell in cable head on top of tools not indicating any pull on
tools (not even tool weight).
15:30 - 16:00 0.50 FISH KEYS PROD1 Held PJSM with Nabors, Baker Fishing and Schlumberger.
16:00 - 16:45 0.75 FISH KEYS PROD1 Tensioned and clamped SWS logging cable. Cut and headed cable for
stripover operation.
16:45 - 18:30 1.75 FISH KEYS PROD1 Hung SWS sheave at crown and RU SWS.
18:30 - 20:00 1.50 FISH KEYS PROD1 Made up 8 1/8" overshot w/3 3~8" grapple and WLEG, oil and bumper
jars and pump out sub on HWDP.
20:00 - 00:00 4.00 FISH KEYS PROD1 RIH with overshot stripping over logging cable to 3229 ft.
1/6/2001 00:00 - 10:00 10.00 FISH GEOM PROD1 Continued RIH with overshot, stripping over logging cable to 9479 ft. PU
Printed: 1/26/2001 4:35:42 PM
RECEIVED
,. Ra.qe6of9
BP EXPLORATION Alaska Oil & Gas Cons. bornmlssT~n
Operations Summary Report Anchorage
Legal Well Name: Z-101
Common Well Name: Z-101 Spud Date: 12/15/2000
Event Name: DRILL+COMPLETE Start: 12/13/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 7ES Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
1/6/2001 00:00 - 10:00 10.00 FISH GEOM PROD1 - 195K, SO - 112K.
10:00 ~ 11:00 1.00 FISH GEOM PROD1 Installed hang off sub and suspended cable. Broke circulation at 200
gpm, 1030 psi and circulated drill pipe volume at 950 psi, 200 gmp.
11:00 - 12:00 1.00 FISH GEOM PROD1 Tagged TOF at 9554 ft. Pushed fish down hole to 9562 ft. as indicated
by logging cable travelling downhole. Pulled fish up hole to 9547 ft.
Worked cable to 7600 lbs. pull several times to latch fish.
12:00 - 12:45 0.75 FISH GEOM PROD1 Laid down single DP, installed hang off sub and pressured to 500 psi.
Began circulating at 200 gpm, 1125 psi indicating fish not latched.
12:45 - 13:30 0.75 FISH GEOM , PROD1 Picked up stand DP. Tagged with 6K wt. at 9562 ft. and pushed to 9568
ft. with indication of latchup. Worked cable to 8500 lbs.
13:30 - 16:30 3.00 FISH GEOM PROD1 Installed hang off sub pressured DP to 950 psi static indicating fish
latched. Stood back stand and broke cable weak link. Spooled cable
on truck.
16:30 - 18:00 1.50 FISH GEOM PROD1 Represured DP to 1100 psi to confirm fish in grapple. Sheared pump
out sub and began circulating at 250 gpm, 1400 psi. Pulled fish up hole
to 9472 ft. had brief 30K overpull then 10-15K drag. Circulated bottoms
up at 450 gpm, 3200 psi.
18:00 - 23:30 5.50 FISH GEOM PROD1 POOH to top of jars. Had tire spot with 25-30K drag in HRZ from 9385
ff. to 9292 ff.
23:30 - 00:00 0.50 FISH GEOM PROD1 Laid down BHA and prepped to lay down logging tools.
1/7/2001 00:00 - 02:30 2.50 FISH GEOM PROD1 Finished laying down fishing tools and logging tools.
02:30 - 05:00 2.50 EVAL PROD1 Tested and calibrated logging tools. Rigged up Schlumberger.
05:00 - 09:00 4.00 EVAL PROD1 Ran Induction, Spectral GR, Sonic, Density and Neutron logs
7500-4294 ft.
09:00 - 10:30 1.50 EVAL PROD1 Rigged down Schlumberger.
10:30 ~ 11:00 0.50 EVAL PROD1 Serviced rig and top drive.
11:00 - 11:15 0.25 EVAL PROD1 Picked up 6 1/2" drill collar for conditioning trip BHA. Had accident on
rig floor involving injury to roughneck.
11:15 - 13:30 2.25 EVAL ACDT PROD1 Suspended operations while evacuating injured roughneck from rig
floor.
13:30 - 14:30 1.00 EVAL PROD1 Held safety meeting.
14:30 - 19:00 4.50 EVAL DPSY PROD1 Repaired damage to pipe shed structure and hydraulics on pipe skate.
19:00 - 20:30 1.50 EVAL PROD1 Made up cleanout BHA.
20:30 - 22:30 2.00 EVAL PROD1 RIH with bit to 4192 ft. base of surface casing.
22:30 - 00:00 1.50 EVAL WTHR PROD1 Circulating at 120 gpm with bit at 4192 ft. to conserve fuel and water
. while WOW!
1/8/2001 00:00 - 21:30 21.50 EVAL WTHR PROD1 'Circulated at 4200 ft., base of surface casing, while WOW Phase II1.
21:30 - 00:00 2.50 EVAL PROD1 RIH with cleanout BHA to 7372 ft.
1/9/2001 00:00 - 01:30 1.50= EVAL PROD1 RIH with bit and cleanout BHA to 9300 ft.
01:30 - 07:30 6.00 EVAL PROD1 i Washed to 9487 ft. Reamed rite hole 9487 ft. to 9560 ft. Reamed bridge
at 9562-9565 ft. Washed and reamed 9565-9950 ft. Had 15 ft. fill.
07:30 - 09:00 1.50 EVAL PROD1 Circulated and conditioned mud. Pumped Hi Vis sweep. Recovered
normal amounts of sand and shale.
09:00 - 10:30 1.50 EVAL PROD1 , Made wiper trip to 9176 ft. Had 40K overpulls thru Kaparuk Sand and
lesser pulls in HRZ. Worked pipe back to 9812 ft. with stackouts in
interval 9552-9600 ft. Had to ream at 9812 ft. Washed to 9950 ft. TD.
10:30 - 11:30 1.00 EVAL PROD1 Pumped Hi Vis sweep. Circulated and conditioned mud.
11:30 - 12:00 0.50 EVAL PROD1 :Made wiper trip 9950-9400 ft. Had 15-25K overpulls in Kaparuk Sand
interval 9620-9552 ft.
12:00 - 14:30 2.50 EVAL PROD1 .Circulated and conditioned mud adding 5 ppb Baranex.
14:30 - 15:00 0.50 EVAL PROD1 :Spotted mud pill containing 5% lubricants and 8 ppb Baranex in interval
'9750-9250 ft.
Printed: 1/26/2001 4:35:42 PM
RECEIVED
MAR 0 1 2001
BP EXPLORATION Page 7 of 9
Alaska Oil & Gas Cons. Commission
Operations Summary ReportAnchorage
Legal Well Name: Z-101
Common Well Name: Z-101 Spud Date: 12/15/2000
Event Name: DRILL+COMPLETE Start: 12/13/2000 End:
:Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 7ES Rig Number:
' Sub
Date From-To Hours Task Code Phase Description of Operations
1/9/2001 15:o0 - 20:00 5.00 EVAL PROD1 POOH with normal drag and no tite spots.
20:00 - 21:00 1.00 EVAL PROD1 Stood HWDP and LD drill collars.
21:00 - 22:00 1.00 EVAL PROD1 Serviced rig and top drive.
22:00 - 22:30 0.50 EVAL PROD1 Held PJSM with Schlumberger and rig crew re DPC logging.
22:30 - 00:00 1.50 EVAL PROD1 Rigged up Schlumberger and picked up MDT pressure and sampling
tool and CMR logging tool. Began testing tool string.
1/10/2001 00:00 - 02:30 2.50 EVAL PROD1 Tested and calibrated logging tools. Found MDT tool not responding.
Laid down logging tools.
02:30 - 03:30 1.00 EVAL LOG PROD1 Backup MDT tool not available. Picked up Schlumberger RFT tool and
CMR logging tools. Surface tested and calibrated tools.
03:30 - 06:00 2.50 EVAL PROD1 RIH with DPC logging tools to 4200 ft.
06:00 - 07:30 1.50 EVAL PROD1 Slipped and cut drill line and adjusted brakes.
07:30 - 08:00 0.50 EVAL PROD1 Installed wireline sheave in derrick.
08:00 - 08:30 0.50 EVAL PROD1 Circulated hole volume and balanced light streak in mud.
08:30 - 10:00 1.50 EVAL PROD1 RIH with logging tools to 6066 ft.
10:00 - 12:00 2.00 EVAL PROD1 Installed drill pipe side door and latched onto logging tools. Tested
tools. Found RFT tools not responding. Decision made to continue in
hole while waiting for delivery of new surface control panel.
12:00 - 14:30 2.50 EVAL LOG PROD1 Continued RIH to 6254 ft. Lost communication with CMR logging tools.
14:30 - 20:00 5.50 EVAL LOG PROD1 POOH to side door and POOH with logging cable. Found cable
shorted. Cut 500 ft. and cable tested OK. Reheaded cable and
relatched tools. Both RFT and CMR tools checked OK.
20:00 - 00:00 4.00 EVAL PROD1 RIH with DPC logging tools to 8025 ft.
1/11/2001 00:00 - 01:00 1.00 EVAL PROD1 RIH with CMR Icg and RFT tools to 9559 ft.
01:00 - 06:30 5.50 EVAL PROD1 Took formation pressures at 9559',9589',9593', 9596'. Attempted
formation fluid sample at 9596' for 2 hrs. Attempted RFT pressures at
9609',9617',9629', and 9635'. Tool appeared to lose function.
06:30 - 11:00 4.50 EVAL PROD1 Ran CMR Icg 9775' - 9500'.
11:00 - 12:00 1.00 EVAL PROD1 Pulled DP and logging tools to 7480 ft.
12:00 - 18:30 6.50 EVAL PROD1 Ran CMR Icg 7451' to 6233'.
18:30 - 23:00 4.50 EVAL PROD1 Functioned DPC RFT tools OK. Took RFT formation pressures at
program depths from 6350' to 7347't.
23:00 - 00:00 1.00 EVAL PROD1 POOH w/DP to side door entry sub.
1/12/2001 00:00 - 02:00 2.00 EVAL PROD1 POOH to side door entry sub. POOH with logging cable. Laid down
side door sub.
02:00 - 02:30 0.50 EVAL PROD1 Broke circulation and pumped dry job.
02:30 - 03:30 1.00 EVAL PROD1 POOH to surface casing shoe.
03:30 - 04:30 1.00 EVAL PROD1 Rigged down Schlumberger and serviced rig.
04:30 - 06:30 2.00 EVAL PROD1 POOH to logging tools.
i06:30 - 08:00 1.50 EVAL PROD1 PJSM. Laid down CMR and RFT logging tools.
!08:00 - 09:00 1.00 EVAL PROD1 PJSM. Picked up sidewall coring tool.
09:00 - 12:15 3.25 EVAL PROD1 RIH with sidewall core gun. Could not get below 6060 ft. POOH.
12:15 - 13:30 1.25 EVAL PROD1 Added logging tool weight bar and roller sub to tool string.
13:30 - 18:30 5.00 EVAL PROD1 RIH with core gun. Attempted 45 sidewall cores. Recovered 45 cores.
18:30 - 19:30 1.00 EVAL PROD1 Rigged down Schlumberger.
19:30 - 20:00 0.50 CLEAN COMP Pull wear bushing and install BOP test plug.
20:00 - 23:30 3.50 CLEAN COMP Tested BOP pipe rams, blind rams, annular preventer, safety valve, dart
Printed: 1/26/2001 4:35:42 PM
RECEIVED
BP EXPLORATION MAR 0 ]. ~00t Page 8 of 9
Operations Summary RepOl~laska Oil & Gas Cons. Commission
Anchorage
Legal Well Name: Z-101
Common Well Name: Z-101 Spud Date: 12/15/2000
Event Name: DRILL+COMPLETE Start: 12/13/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 7ES Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
1/12/2001 20:00 - 23:30 3.50 CLEAN COMP valve, kelly valves, choke manifold, kill line, standpipe and kelly hose to
250/3500 psi per BP Amoco and AOGCC requirements. Witness of
test waived by John Crisp, AOGCC agent.
23:30 - 00:00 0.50 CLEAN COMP PJSM. Picked up 8 1/2" bit and 3 - 6 1/2" drill collars.
1/13/2001 00:00 - 06:30 6.50 CLEAN COMP RIH with cleanout BHA to 9550 ft.
06:30 - 08:30 2.00 CLEAN COMP Washed and reamed hole from 9550 ft to 9950 ft. TD.
08:30 - 10:00 1.50 CLEAN COMP Circulated Hi Vis sweep surface to surface at 520 gpm with 113 rpm
rotary.
10:00 - 11:00 1.00. CLEAN COMP Made wiper trip to 9400 ft. Had 60K overpulls at 9895 ft and 9575 ft.
and 20-50K overpulls throughout interval. Had to circulate in order to
pull thru interval 9575-9550 ft.
11:00 - 12:30 1.50 CLEAN COMP RIH to TD. Had to work hole at 9545-9555 ft. to 35K weight and 9643
ft. to 50K weight.
12:30 - 14:00 1.50 CLEAN COMP Circulated bottoms up at 530 gpm, 110 rpm rotary. Recovered
moderate amount of cuttings. Pumped dry job.
14:00 - 17:00 3.00 CLEAN COMP POOH to casing shoe for wiper trip.
17:00 - 19:00 2.00 CLEAN COMP Slipped and cut drill line and serviced top drive.
19:00 - 22:30 3.50 CLEAN COMP RIH to TD to complete wiper trip. Did not encounter any significant
resistance.
22:30 - 00:00 1.50 CLEAN COMP Circulated Hi Vis sweep surface to surface at 540 gpm, 110 rpm rotary.
1/14/2001 00:00 - 02:30 2.50 CLEAN COMP Finished circulating Hi Vis sweep surface to surface. Increased
lubricant concentration in mud to 5%.
02:30 - 03:00 0.50 CLEAN , COMP POOH laying down drill pipe.
03:00- 04:30 1.50 CLEAN FLOR COMP Repaired pipe skate.
04:30 - 12:00 7.50 CLEAN COMP POOH laying down drill pipe. Had 25K overpull at 9570' and 9547'.
Worked hole - OK.
12:00 - 13:30 1.50 CLEAN COMP Laid down BHA.
13:30 - 18:30 5.00 CLEAN COMP Pulled wear bushing. PJSM. Installed 7" rams in BOP. Tested BOP to
2500 psi. RU casing handling equipment.
18:30 - 19:00 0.50 CASE COMP Made up casing hanger on landing joint. Seated hanger in wellhead
and marked joint.
19:00 - 19:30 0.50 CASE COMP PJSM with Nabors, GBR.
19:30 - 20:00 0.50 CASE COMP Made up float equipment and test same for circulation.
20:00 - 00:00 4.00 CASE COMP RIH picking up 7" casing.
1/15/2001 00:00 - 12:30 12.50 CASE COMP RIH picking up 7" casing to 9923 ft. Had to work casing past tight spots
at 9850' and 9870'. Casing stuck on bottom. Worked up to 375K
(135K overpull). Landed hanger with 96K weight.
12:30 - 15:30 3.00 CEMT COMP Circulated and conditioned mud. Increased circulation rate to 7.0 bpm,
980 psi. Rigged down Franks tool and installed cementing head.
15:30- 15:45 0.25 CEMT COMP Held PJSM with Nabors, Dowell, Baroid, Peak, FMC.
15:45 - 16:30 0.75 CEMT COMP Circulated hole while batch mixing cement.
16:30 - 19:30 3.00 CEMT COMP Pumped 5 bbls. preflush and tested lines to 4500 psi. Pumped 15 bbls
preflush and 75 bbls MudPUSH spacer weighted to 11.0 ppg. Dropped
bottom plug. Mixed and pumped 130 bbls of LiteCRETE cement mixed
to 11.5-11.6 ppg. Pumped 67 bbls of Class G cement from batch mixer
weighted to 15.8 ppg. Washed up cementing lines to floor. Dropped top
plug and displaced cement with 368 bbls. seawater at average rate of
6.23 bpm. Final rate of 3.0 bpm with 1715 psi. Bumped plug with 3063
psi and held pressure for 5 minutes. Bled off pressure and floats held
OK. WOC at 19:30 hrs.
19:30 - 21:00 1.50 RUNCOI~! COMP Rigged down casing equipment and landing joint. Cleared floor and
loaded out tools.
21:00 - 22:30 1.50 RUNCOr~! COMP Installed 9 5/8'" X 7" packoff and tested to 5000 psi - OK
Printed: 1/26/2001 4:35:42 PM
BP EXPLORATION Page 9 of 9
Operations Summa Report
Alaska 0il & Gas Cons. Commission
'Legal Well Name: Z-101 Anchorage
Common Well Name: Z-101 Spud Date: 12/15/2000
Event Name: DRILL+COMPLETE Start: 12/13/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 7ES Rig Number:
Sub Phase Description of Operations
Date From-To Hours Task Code
1/15/2001 22:30 - 00:00 1.50 RUNCOI~ COMP Rigged up to run 3 1/2" completion. Installed second annulus valve.
1/16/2001 00:00 - 01:00 1.00 RUNCOI~ COMP Conducted PJSM for running 3-1/2" tubing.
01:00 - 09:00 8.00 RUNCOI~ COMP RIH w/9.3# L-80 8rd tubing with GLM's to 6144'.
09:00 - 10:00 1.00 CASE COMP Tested 7" casing to 3000 psi.
10:00 - 15:00 5.00 RUNCOI~q COMP Finished run 3-1/2" completion to 9444'.
15:00 - 19:30 4.50 RUNCOI~ COMP Reverse circulate to clean seawater and corrosion inhibitor.
19:30 - 20:30 1.00 RUNCOI~ COMP Land tubing, RILDS.
20:30 - 22:00 1.50 RUNCOI~ COMP Dropped ball. Pressure tubing to 3500 psi, 30 min test good. Bleed
tubing pressure to 1500 psi. Pressure annulus to 3500 psi, 30 rain test
good. Bleed tubing pressure, sheared RP. LID landing jt.
22:00 - 23:00 1.00 BOPSUF COMP Shut blind rams, changed top set pipe rams from 7" to 3-1/2"x6".
23:00 - 00:00 1.00 BOPSUF',COTR COMP Attempted to set TWC. Did not set correctly, unseated cocked on top
of hanger. Wait on magnet to fish TWC.
1/17/2001 00:00 - 01:00 1.00 CASE COTR COMP Pumped 100 bbls H20 and 65 bbls diesel in 7" x 9-5~8" casing annulus
for freeze protection.
01:00 - 03:00 2.00 BOPSUF REME COMP Recovered TWC with magnet. (Dropped on side in wellhead)
03:00 - 03:30 0.50 BOPSUF COMP Installed TWC and tested to 3000 psi.
03:30 - 05:30 2.00 BOPSUR COMP N/D BOP's and DSA.
05:30 - 08:00 2.50 BOPSUR COMP N/U adapter flange and tree. Tested to 5000 psi.
08:00 - 09:00 1.00 RUNCOI~ COMP Serviced top drive.
09:00 - 10:30 1.50 WHSUR COMP R/U DSM and pulled TWC w/lubricator.
10:30 - 13:00 2.50 RUNCOI~ ,COMP R/U and pumped 65 bbls diesel freeze protect. Allowed to U-tube.
13:00 - 14:30 1.50 WHSUR COMP Set BPV. Removed secondary annular valve. Secured well. Cleaned
~its. Released rig @ 1430 hrs 1/17/01.
Printed: 1/26/2001 4:35:42 PM
18-J an-01
AOGCC
3001 Porcupine Drive
Anchorage, AK 99501
Definitive Survey
Re: Distribution of Survey Data for Well Z-101
Dear Dear SidMadam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
'MD
9,950.00' MD
(if applicable
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA Z Pad, Slot Z-101
Z-101
Surveyed: 4 January, 2001
SURVEY REPORT
26 January, 2001
Your Ref: AP1500292297800
Surface Coordinates: 5959359.86 N, 599659.28 E (70° 17' 54.0954"N, 149° 11'34.5366" VIO
Kelly Bushing: 81.80ft above Mean Sea Level
BRILLINB S[E RVI I~E~ 5
Survey Ref: svy10724
A Halliburton Company
SPerry-Sun Drilling Services
Survey Report for Z-lOl
Your Ref: AP1 500292297800
Surveyed: 4 January, 200~
DE
FINITIVE
North Slope Alaska
Measured
Depth
(ft)
Incl.
0.00 0.000 0.000
147.02 0.220 64.030
230.77 0.650 344.710
275.73 1.290 332.190
325.24 1.370 332.950
356.79 1.510 330.560
386.95 1.940 323.890
417.62 2.550 315.980
449.22 3.050 312.810
479.62 3.600 313.200
513.62 3.830 315.800
539.97 4.190 315.860
574.90 4.830 319.170
602.54 5.530 322.220
634.56 6.660 325.700
661.47 8.140 329.120
694.24 9.860 332.420
726.63 11.340 334.180
758.28 12.020 335.780
788.08 12.280 335.980
828.10 12.750 336.430
858.82 13.120 336.290
891.98 13.100 336.190
920.84 13.660 334.950
952.26 14.400 332.650
Sub-Sea
Depth
(ft)
-81.80
65.22
148.97
193.92
243.42
274.96
305.10
335.75
367.31
397.66
431.59
457.88
492.70
520.22
552.06
578.75
611.11
642.95
673.94
703.08
742.15
772.09
804.38
832.46
862.94
Vertical
Depth
(ft)
Local Coordinates
Northings Eastings
(ft) (ft)
0.00 0.00 N 0.00 E
147.02 0.12 N 0.25 E
230.77 0.65 N 0.27 E
275.72 1.35 N 0.03W
325.22 2.37 N 0.56W
356.76 3.06 N 0.94W
386.90 3.82 N 1.43W
417.55 4.73 N 2.21W
449.11 5.81N 3.32W
479.46 7.01N 4.61W
513.39 8.56 N 6.18W
539.68 9.88 N 7.46W
574.50 11.91N 9.31W
602.02 13.84 N 10.89W
633.86 16.59 N 12.88W
660.55 19.52 N 14.74W
692.91 24.00 N 17.23W
724.75 29.32 N 19.90W
755.74 35.13 N 22.60W
784.88 40.85 N 25.17W
823.95 48.79 N 28.66W
853.89 55.09 N 31.42W
886.18 61.97 N 34.45W
914.26 68.05 N 37.22W
944.74 74.88 N 40.58W
981.90 14.620 330.740 891.64 973.44
1010.85 15.470 329.920 919.59 1001.39
1041.82 17.270 329.610 949.31 1031.11
1074.56 19.560 329.730 980.37 1062.17
1107.11 20.960 330.080 1010.90 1092.70
81.42 N 44.10W
87.95 N 47.82W
95.49 N 52.22W
104.41N 57.44W
114.17 N 63.09W
Global Coordinates Dogleg
Northings Eastings Rate
(ft) (ft) (°/100ft)
5959359.86 N 599659.28 E
5959359.99 N 599659.53 E
5959360.52 N 599659.54 E
5959361.21N 599659.23 E
5959362.22 N 599658.69 E
5959362.91N 599658.30 E
5959363.66 N 599657.80 E
5959364.56 N 599657.01 E
5959365.62 N 599655.89 E
5959366.81N 599654.58 E
5959368.33 N 599652.99 E
5959369.64 N 599651.69 E
5959371.64 N 599649.81E
5959373.55 N 599648.21 E
5959376.28 N 599646.18 E
5959379.18 N 599644.29 E
5959383.63 N 599641.74 E
5959388.91N 599639.00 E
5959394.69 N 599636.21E
5959400.38 N 599633.57 E
5959408.26 N 599629.97 E
5959414.53 N 599627.13 E
5959421.37 N 599624.01 E
5959427.41 N 599621.16 E
5959434.20 N 599617.71 E
5959440.69 N 599614.10 E
5959447.17 N 599610.29 E
5959454.65 N 599605.80 E
5959463.50 N 599600.46 E
5959473.18 N 599594.68 E
0.15
0.77
1.49
0.17
0.48
1.57
2.23
1.66
1.81
0.84
1.37
1.98
2.72
3.71
5.74
5.48
4.68
2.38
0.88
1.20
1.21
0.09
2.18
2.95
1.78
3.03
5.82
7.00
4.32
Alaska Drilling & Wells
PBU WOA Z Pad
Vertical
Section Comment
0.00
-0.03
0.42
1.17
2.31
3.11
4.01
5.19
6.69
8.38
10.52
12.31
15.01
17.48
20.86
24.33
29.45
35.39
41.76
47.98
56.58
63.40
7O.86
77.49
85.O8
92.49
100.00
108.73
119.07
130.34
MWD Magnetic
26 January, 2001 - ~:~7 Page 2 of 8 Dr#/Quest 2.00.06
Sperry-Sun Drilling Services
Survey Report for Z-'lO1
Your Ref: APl 500292297800
Surveyed: 4 January, 2001
North Slope Alaska
Measured
Depth
(ft)
Sub-Sea
Depth
(ft)
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
1134.70 21.840 330.450 1036.59 1118.39
1166.64 22.420 331.000 1066.18 1147.98
1202.05 24.500 333.250 1098.66 1180.46
1229.33 25.970 333.930 1123.34 1205.14
1260.97 26.620 334.220 1151.70 1233.50
1289.73 27.900 333.060 1177.27 1259.07
1320.68 28.900 330.310 1204.49 1286.29
1351.27 29.170 329.310 1231.24 1313.04
1382.37 30.260 328.480 1258.25 1340.05
1413.26 30.400 327.750 1284.91 1366.71
1446.92 30.510 326.150 1313.93 1395.73
1480.96 31.430 326.100 1343.11 1424.91
1511.04 31.290 325.550 1368.80 1450.60
1542.90 31.160 326.200 1396.04 1477.84
1574.27 31.760 326.880 1422.80 1504.60
1605.66 32.170 327.700 1449.43 1531.23
1636.45 33.010 327.380 1475.38 1557.18
1665.45 34.020 328.370 1499.55 1581.35
1695.44 34.290 328.410 1524.37 1606.17
1729.59 34.160 328.660 1552.61 1634.41
1761.57 35.600 327.850 1578.84 1660.64
1793.48 37.910 327.550 1604.41 1686.21
1823.16 40.300 327.250 1627.44 1709.24
1856.79 41.190 327.380 1652.92 1734.72
1917.05 40.180 327.620 1698.61 1780.41
2008.69 41.120 327.610 1768.14 1849.94
2102.94 44.630 326.950 1837.20 1919.00
2197.22 47.910 328.690 1902.36 1984.16
2292.09 50.240 326.720 1964.51 2046.31
2384.76 53.860 325.480 2021.49 2103.29
122.91N 68.09W
133.40 N 73.97W
145.87 N 80.55W
156.28 N 85.72W
168.89 N 91.85W
Global Coordinates Dogleg
Northings Easfings Rate
(ft) (ft) (°/100ft)
5959481.85 N 599589.57 E
5959492.27 N 599583.55 E
5959504.65 N 599576.80 E
5959514.99 N 599571.50 E
5959527.52 N 599565.20 E
180.69 N 97.70W 5959539.24 N 599559.19 E
193.65 N 104.68W 5959552.10 N 599552.04 E
206.48 N 112.15W 5959564.83 N 599544.40 E
219.68 N 120.11W 5959577.92 N 599536.26 E
232.92 N 128.35W 5959591.06 N 599527.85 E
247.22 N 137.66W 5959605.23 N 599518.36 E
261.76 N 147.42W 5959619.64 N 599508.40 E
274.71N 156.21W 5959632.48 N 599499.44E
288.39 N 165.48W 5959646.03 N 599489.99 E
302.04 N 174.51W 5959659.56 N 599480.78 E
316.03 N 183.49W 5959673.43 N 599471.62 E
330.02 N 192.39W 5959687.30 N 599462.53 E
343.58 N 200.90W 5959700.75 N 599453.84 E
357.92 N 209.73W 5959714.97 N 599444.83 E
374.30 N 219.75W 5959731.22 N 599434.58 E
389.85 N 229.37W 5959746.64 N 599424.76 E
405.99 N 239.58W 5959762.64 N 599414.34 E
421.76 N 249.66W 5959778.27 N 599404.04 E
440.24 N 261.52W 5959796.59 N 599391.95 E
473.37 N 282.63W 5959829.44 N 599370.40 E
523.78 N 314.60W 5959879.42 N 599337.76 E
577.71 N 349.27W 5959932.89 N 599302.38 E
635.38 N 385.52W 5959990.07 N 599265.37 E
695.95 N 423.83W 5960050.13 N 599226.26 E
756.58 N 464.59W 5960110.21 N 599184.69 E
3.23
1.93
6.39
5.49
2.09
4.82
5.32
1.82
3.75
1.28
2.43
2.70
1.06
1.13
2.22
1.90
2.78
3.96
0.90
0.56
4.73
7.26
8.08
2.66
1.70
1.03
3.75
3.73
2.91
4.05
Alaska Drilling & Wells
PBU WOA Z Pad
Vertical
Section Comment
140.40
152.43
166.50
178.09
192.05
205.17
219.87
234.71
250.13
265.73
282.78
300.27
315.91
332.40
348.76
365.37
381.95
397.96
414.80
434.00
452.29
471.38
490.09
512.04
551.31
610.99
675.09
743.19
814.84
887.82
26 January, 2001 - ~:~7 Page 3 of 8 DrillQuest 2.00.06
Sperry-Sun Drilling Services
Survey Report for Z-lOl
Your Ref: AP1500292297800
Surveyed: 4 January, 200~
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea Vertical Local Coordinates
Depth Depth Northings Eastings
(ft) (ft) (ft) (ft)
2478.11 58.530 325.180 2073.41 2155.21
2571.82 58.930 322.600 2122.06 2203.86
2664.64 58.210 322.200 2170.46 2252.26
2757.87 57.230 321.990 2220.25 2302.05
2849.96 57.150 324.050 2270.15 2351.95
2943.88 56.840 326.070 2321.32 2403.12
3037.21 57.560 325.830 2371.88 2453.68
3131.29 58.440 327.170 2421.73 2503.53
3222.72 58.690 327.300 2469.41 2551.21
3320.60 58.370 325.820 2520.52 2602.32
3410.12 58.730 325.810 2567.22 2649.02
3502.84 58.880 326.120 2615.25 2697.05
3597.00 59.040 326.950 2663.80 2745.60
3690.93 59.040 326.500 2712.12 2793.92
3786.27 58.730 325.250 2761.39 2843.19
3878.07 58.180 323.730 2809.42 2891.22
3971.40 58.690 324.120 2858.27 2940.07
4064.17 58.640 323.980 2906.52 2988.32
4157.21 58.390 323.290 2955.11 3036.91
4245.47 58.000 323.400 3001.63 3083.43
4337.71 58.120 322.970 3050.42 3132.22
4433.49 58.850 324.140 3100.49 3182.29
4524.37 58.930 324.470 3147.45 3229.25
4617.86 56.230 326.950 3197.57 3279.37
4711.75 55.780 328.430 3250.07 3331.87
4805.00 57.880 327.780 3301.09 3382.89
4897.93 55.660 328.580 3352.01 3433.81
4989.88 57.330 331.720 3402.77 3484.57
5083.23 58.240 331.560 3452.54 3534.34
5177.04 58.480 331.650 3501.75 3583.55
Global Coordinates
Northings Eastings
(ft) (ft)
820.35 N 508.71W 5960173.40 N 599139.74 E
885.05 N 555.91W 5960237.46 N 599091.68 E
947.80 N 604.23W 5960299.57 N 599042.53 E
1009.99 N 652.66W 5960361.11 N 598993.29 E
1071.82 N 699.21W 5960422.31N 598945.92 E
1136.38 N 744.32W 5960486.27 N 598899.96 E
1201.38 N 788.24W 5960550.68 N 598855.17 E
1267.91N 832.28W 5960616.62 N 598810.26 E
1333.51 N 874.49W 5960681.65 N 598767.18 E
1403.17 N 920.50W 5960750.70 N 598720.26 E
1466.34 N 963.40W 5960813.30 N 598676.51E
1532.07 N 1007.80W 5960878.43 N 598631.26 E
1599.37 N 1052.28W 5960945.14 N 598585.88 E
1666.71N 1096.48W 5961011.89 N 598540.80 E
1734.28 N 1142.26W 5961078.84 N 598494.12 E
1797.96 N 1187.70W 5961141.92 N 598447.84 E
1862.24N 1234.53W 5961205.56 N 598400.17 E
1926.38 N 1281.05W 5961269.09 N 598352.80 E
1990.27 N 1328.09W 5961332.35 N 598304.92 E
2050.45 N 1372.87W 5961391.92 N 598259.34 E
2113.11 N 1419.77W 5961453.96 N 598211.61 E
2178.80 N 1468.27W 5961518.99 N 598162.24 E
2241.99 N 1513.67W 5961581.58 N 598116.01E
2307.16 N 1558.15W 5961646.16 N 598070.68 E
2372.95 N 1599.75W 5961711.38 N 598028.20 E
2439.21 N 1641.00W 5961777.09 N 597986.08 E
2505.25 N 1681.98W 5961842.59 N 597944.22 E
2571.75 N 1720.12W 5961908.57 N 597905.21E
2641.25 N 1757.64W 5961977.56 N 597866.77 E
2711.50 N 1795.62W 5962047.31 N 597827.86 E
Dogleg
Rate
(o/.~ooff)
5.01
2.39
0.86
1.07
1.88
1.83
0.80
1.53
0.30
1.33
0.40
0.33
0.77
0.41
1.17
1.53
0.65
0.14
0.69
0.45
0.42
1.29
0.32
3.65
1.39
2.33
2.50
3.38
0.99
0.27
Alaska Drilling & Wells
PBU WOA Z Pad
Vertical
Section Comment
965.22
1045.01
1123.72
1201.99
1278.99
1357.58
1435.93
1515.64
1593.63
1677.04
1753.30
1832.52
1913.13
1993.62
2075.14
2153.15
2232.38
2311.34
2390.36
2465.02
2542.92
2624.22
2701.79
2780.58
2858.40
2936.44
3014.17
3090.80
3169.68
3249.45
26 January, 200ri- 11:17 Page 4 of 8 DriilQuest 2.00.06
Sperry-Sun Drilling Services
Survey Report for Z-lO1
Your Ref: AP1 500292297800
Surveyed: 4 January, 200~
North Slope Alaska
Measured
Depth
(ft)
Incl.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
5269.26 58.580 331.560 3549.89 3631.69
5362.55 58.640 330.850 3598.48 3680.28
5456.27 58.800 330.480 3647.15 3728.95
5549.32 58.470 330.270 3695.58 3777.38
5644.06 58.820 330.540 3744.87 3826.67
5737.17 59.620 329.030 3792.52 3874.32
5830.91 59.510 330.090 3840.01 3921.81
5922.54 59.060 330.240 3886.81 3968.61
6014.42 59.050 330.480 3934.06 4015.86
6108.16 59.510 328.960 3981.95 4063.75
6200.79 60.110 329.830 4028.53 4110.33
6295.52 58.880 329.640 4076.61 4158.41
6389.45 58.640 328.510 4125.33 4207.13
6483.76 57.180 327.840 4175.43 4257.23
6573.67 54.330 328.370 4226.02 4307.82
6669.73 51.040 329.560 4284.24 4366.04
6761.77 49.890 329.430 4342.83 4424.63
6856.04 47.900 330.030 4404.80 4486.60
6948.70 45.880 330.360 4468.13 4549.93
7042.36 42.920 329.710 4535.04 4616.84
7135.47 37.490 329.640 4606.12 4687.92
7229.12 35.860 329.110 4681.23 4763.03
7321.88 36.420 328.120 4756.14 4837.94
7417.20 36.410 328.000 4832.85 4914.65
7508.60 36.440 328.380 4906.39 4988.19
7600.58 36.380 327.360 4980.42 5062.22
7694.98 36.370 326.620 5056.42 5138.22
7788.49 36.410 326.480 5131.70 5213.50
7880.41 36.540 325.840 5205.61 5287.41
7972.96 36.530 325.390 5279.98 5361.78
Global Coordinates Dogleg
Northings Eastings Rate
(ft) (ft) (°/100ft)
2780.70 N 1833.02W 5962116.00 N 597789.55 E
2850.48 N 1871.38W 5962185.28 N 597750.26 E
2920.31N 1910.62W 5962254.58 N 597710.10 E
2989.38 N 1949.89W 5962323.12 N 597669.91E
3059.73 N 1989.85W 5962392.93 N 597629.03 E
3128.85 N 2030.11W 5962461.51 N 597587.86 E
3198.53 N 2071.06W 5962530.64 N 597545.99 E
3266.86 N 2110.25W 5962598.45 N 597505.90 E
3335.35 N 2149.22W 5962666.42 N 597466.02 E
3404.94 N 2189.85W 5962735.46 N 597424.47 E
3473.85 N 2230.61W 5962803.83 N 597382.80 E
3544.34 N 2271.75W 5962873.77 N 597340.73 E
3613.24 N 2313.02W 5962942.11 N 597298.55 E
3681.12 N 2355.15W 5963009.43 N 597255.52 E
3744.22 N 2394.42W 5963071.99 N 597215.42 E
3809.66 N 2433.81W 5963136.91N 597175.16 E
3870.82 N 2469.84W 5963197.58 N 597138.32 E
3932.16 N 2505.65W 5963258.44 N 597101.70 E
3990.85 N 2539.28W 5963316.69 N 597067.30 E
4047.62 N 2572.00W 5963373.02 N 597033.83 E
4099.48 N 2602.33W 5963424.47 N 597002.81 E
4147.62 N 2630.82W 5963472.22 N 596973.69 E
4194.32 N 2659.31W 5963518.54 N 596944.58 E
4242.33 N 2689.25W 5963566.16 N 596914.01 E
4288.45 N 2717.85W 5963611.89 N 596884.80 E
4334.68 N 2746.89W 5963657.74 N 596855.15 E
4381.63 N 2777.39W 5963704.28 N 596824.03 E
4427.92 N 2807.97W 5963750.15 N 596792.84E
4473.31N 2838.40W 5963795.13 N 596761.81E
4518.78 N 2869.51W 5963840.19 N 596730.10 E
0.14
0.65
0.38
0.40
0.44
1.64
0.98
0.51
.
0.22
1.48
1.04
1.31
1.06
1.66
3.21
3.56
1.25
2.16
2.20
3.20
5.83
1.77
0.87
0.08
0.25
0.66
0.47
.0.10
0.44
0.29
Alaska Drilling & Wells
PBU WOA Z Pad
Vertical
Section Comment
3328.02
3407.58
3487.64
3567.06
3647.93
3727.91
38O8.73
3887.48
3966.26
4046.83
4126.89
4208.49
4288.80
4368.69
4443.00
4519.39
4590.37
4661.39
4729.01
4794.52
4854.59
4910.52
4965.23
5021.81
5O76.O7
5130.66
5186.62
5242.05
5296.63
5351.64
26 January, 200~ - ~1:~7 Page 5 of 8 DriilQuest 2.00.06
Sperry-Sun Drilling Services
Survey Report for Z-lO1
Your Ref: APl 500292297800
Surveyed: 4 January, 200~
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
8064.86 36.300 325.450 5353.93 5435.73 4563.69 N 2900.47 W
8158.44 35.920 323.730 5429.54 5511.34 4608.64 N 2932.42 W
8251.05 35.550 323.440 5504.71 5586.51 4652.17 N 2964.53 W
8345.99 35.250 321.990 5582.10 5663.90 4695.92 N 2997.84 W
8439.85 34.830 322.560 5658.95 5740.75 4738.54 N 3030.82 W
Global Coordinates Dogleg
Northings Easfings Rate
(ft) (f't) (°/~OOft)
5963884.69 N 596698.54 E
5963929.21N 596666.00 E
5963972.30 N 596633.32 E
5964015.61N 596599.43 E
5964057.80 N 596565.89 E
8532.93 34.160 321.940 5735.66 5817.46 4780.23 N 3063.09W
8626.59 33.420 322.490 5813.50 5895.30 4821.39 N 3095.00W
8720.07 32.200 321.580 5892.07 5973.87 4861.33 N 3126.16W
8814.04 31.980 321.540 5971.68 6053.48 4900.43 N 3157.19W
8907.15 31.480 321.100 6050.87 6132.67 4938.66 N 3187.80W
5964099.05 N 596533.07 E
5964139.78 N 596500.61E
5964179.30 N 596468.93 E
5964217.99 N 596437.38 E
5964255.81 N 596406.27 E
9000.36 31.660 320.400 6130.29 6212.09 4976.44N 3218.67W
9093.29 31.620 320.180 6209.41 6291.21 5013.95 N 3249.82W
9187.86 31.860 320.730 6289.83 6371.63 5052.31N 3281.49W
9281.30 31.630 320.930 6369.29 6451.09 5090.42 N 3312.54W
9373.94 31.700 318.960 6448.14 6529.94 5127.64 N 3343.84W
5964293.18 N 596374.90 E
5964330.27 N 596343.26 E
5964368.21 N 596311.08 E
5964405.91N 596279.52 E
5964442.71N 596247.74 E
9468.30 31.820 321.250 6528.38 6610.18 5165.74 N 3375.69W
9561.24 32.350 320.520 6607.12 6688.92 5204.05 N 3406.83W
9654.39 32.010 320.540 6685.96 6767.76 5242.34N 3438.37W
9749.97 29.160 320.780 6768.24 6850.04 5279.95 N 3469.20W
9843.52 26.700 320.520 6850.88 6932.68 5313.83 N 3496.97W
5964480.38 N 596215.39 E
5964518.27 N 596183.74 E
5964556.14 N 596151.69 E
5964593.34 N 596120.37 E
5964626.85 N 596092.14 E
9893.99 25.410 320.480 6896.22 6978.02 5330.94 N 3511.08W
9950.00 25.410 320.480 6946.82 7028.62 5349.48 N 3526.37W
5964643.77 N 596077.82 E
5964662.10 N 596062.28 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet.
Vertical Section is from Well and calculated along an Azimuth of 328.820° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 9950.00ft.,
The Bottom Hole Displacement is 6407.20ft., in the Direction of 326.607° (True).
0.25
1.16
0.44
0.94
0.57
0.81
0.85
1.41
0.24
0.59
0.44
0.13
0.40
0.27
1.12
1.28
0.71
0.37
2.98
2.63
2.56
0.00
Alaska Drilling & Wells
PBU WOA Z Pad
Vertical
Section Comment
5406.10
5461.10
5514.96
5569.64
5623.18
5675.55
5727.29
5777.59
5827.11
5875.66
5923.97
5972.18
6021.40
6070.09
6118.13
6167.22
6216.11
6265.20
6313.34
6356.71
6378.64
6402.42
Projected Survey
26 January, 2001 - ~I:~7 Page 6 of 8 DriilQuest 2.00.06
Sperry-Sun Drilling Services
Survey Report for Z-'lO1
Your Ref: AP1500292297800
Surveyed: 4 January, 2001
North Slope Alaska
Alaska Drilling & Wells
PBU WOA Z Pad
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
9950.00 7028.62 5349.48 N 3526.37W
Comment
Projected Survey
Survey tool program for Z-IOI
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (ft)
0.00 0.00
9950.00 7028.62
Survey Tool Description
MWD Magnetic
26 January, 2001 - ~ ~: ~ 7 Page 7 of 8 DrillQuest 2.00.06
PETROLEllX SERVICES
Core Laboratories - Alaska
From: Core Laboratories
600 W. SSth Ave., Unit D
Anchorage, ..Alaska
99518
Well Name: B.P. Exploration Z-101
":' .':" Number of Samples: 115
;
,
Contact: Philip Cervany
,,,
,
, ,,
[ ·
Description of Material:
Core Chip Samples
To:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska
99501
9537-9657 *
· No Samples for 9575,9576,9635,9636 Corn Break
Received By:
Tim Lawlor
Core Laboratories
ALASKA OIL AND GAS
CONSERVATION CO~IMISSION
TONY KNOWLES, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Dan Stone
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
R.e~
Prudhoe Bay Unit Z- 101
BP Exploration (Alaska), Inc.
Permit No: 200-162
Sur Loc: 722' SNL, 1938' EWL, Sec. 19, T11N, R12E, UM
Btmhole Loc. 540' SNL, 1366' WEL, Sec. 13, T11N, R11E, UM
'Dear Mr. Stone:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BoPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Daniel T. Seamou , .
Commissioner
BY ORDER OF THE COMMISSION
DATED this ~ day of November, 2000
lit/Enclosures
cc: Department of Fish & Game, Habitat Section w/o encl.
Depamnent of Enviromnental Conservation w/o encl.
STATE OF ALASKA
ALASI~I )IL AND GAS CONSERVATION COIV('~ 3SION
PERMIT TO DRILL
20 AAC 25.005
[] Exploratory [] Stratigraphic Test [] Development Oil
la. Type of work ~ Drill [] Reddll lb. Type of well [] Service [] Development Gas [] Single Zone
Re-Entry [] Deepen [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RKB -- 84' Prudhoe Bay Field/-,~
3. Address 6. Property Designation Rivcr
P.O. Box 196612, Anchorage, Alaska 99519-6612 OZ~ ADL 028245 ~r~'
4. Location of well at surface 7. Un~ or Property Name 11. Type Bond (See 2O AAC 25.0~5)
722' SNL, 1938' EWL, SEC. 19, T11N, R12E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
664' SNL, 1333' WEL, SEC. 13, T11N, R11E, UM Z-101 Number 2S100302630-277
,
At total depth 9. Approximate spud date
540' SNL, 1366' WEL, SEC. 13, T11 N, R11E, UM 11/10/00 Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028262, 1366' MDI Z-26 is 92' away at 700' MD 2560 10092' MD / 7049' 'i'VD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 250' MD Maximum Hole Angle 58.8 o Maximum surface 2741 psig, At total depth (TVD) 6591' / 3400 psig
....
18. Casing Program l Specifications Setting Depth
Size MD TOPTvD! Bottom Quantity of Ce. ment
Hole Casing Weight Grade Coupling Len,qth MD TVD (include sta,qe data)
30" 20" 91.5# H-40 Weld 80' Surface I Surface 110' 110' 260 sx Arctic Set (Approx.)
12-1/4" 9-5/8" 40# L-80 BTC 4345' 30' 30' 4375' 3129' 804 sx Articset Lite 3, 315 sx 'G'
8-3/4" 7" 29# L-80 BTC-M 10062' 30' 30' 10092' 7049' ~433 sx Class 'G'
,
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
Production
Liner
0 RIG IN A L oc' o::,,,
Perforation depth: measured Alaska ()ii & ¢:~.:;. C.0:~s. C,~:rarr.,iss'i0r~
Ai-~ch0~age
true vertical
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Bill Isaacson, 564-5521 Prepared By Name/Number: Sondra Stewrnan, 564-4750
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed DanStone ~.,~_. ".r"¢3.~ Title Senior Drilling Engineer Date
'Permit:::':'L';~'":"'"':"'""'::":'":": 'i" .".'. "::;:; :.':;::!:'"~..' ¢., '_..I~r- mu/""";"l"Nu'-Je'r '_ ___' '_']."" ' ' '"'" ' I "~ pi a~,uu';p'--o,v~'l";"~-t'~" '""Ii se~ ~oVer letter '
Num"' ~' ' ' ..)-~ i'::.:" i:::..:..; !::i::',.' .,,'..'.'.:? ~.:~'.; '.. "i':::::; "::' '":': :;':" "';i.::"~ ': .:' ::"::~: "?; '.':".:!;': i."i'"":"""!~b~ ~i.[~i6il':':;U se"~'Oii"l~i,:;,,::.: ':; i. ': ..i.. ?.,.'; :: ".;.:.!!:' !i ':: .'".i;:';:. i 'i;:;',.i 'i:::' i.';!"?,"., i':: ":' ".':' !':': 'i :ii..:: :': i?.':'":'"? :'.'] i.:..'"::' i.:.', i' ! :'?'''' .' '?' i;':"]': ':. !'' ". "' :" '"': ":'
/~/-~-50- 02.-'~'.- ,Z-.,~¢'7~:~- O(U I '1t/c~/0'0 I for other requirements
Conditions of Approval: Samples Required [] Yes ~'No Mud Log Required [] Yes 121' No
Hydrogen Sulfide Measures [] Yes Ij~].No Directional Survey Required ~ Yes [] No
Required Working Pressure for BOPE1~I2K [] 3K [] 4K [] 5K [] 10K [] 15K ~3.5K psi
Other:
by order of
Approved By Commissioner the commission Date
Form 10-401 Rev. 12-01-85 Submit In Triplicate
From: Tom Maunder [mailto:tom_maunder@admin.state.ak.us]
Sent: Friday, October 13, 2000 4:17 PM
To: Bill Isaacson
Cc: Bob Crandall; Steve Davies
Subject: [Fwd: [Fwd: Z- 101 Intermediate Cementing]]
Bill,
For your info, here is Bob Crandall's reply to the shallow oil. As I
said before, you guys did your homework. Based on the fault
interpretation out there, your block does look to be wet in the
"shallows". We will all have to be mindful of how broken up the geology
is out West and that it is possible that this zone will have oil in it
in other fault blocks. If you have any questions, please call.
Tom Maunder
Subject:
Date:
From:
To:
Re: [Fwd: Z- 101 Intermediate Cementing]
Fri, 13 Oct 2000 19:22:23 -0000
Robert Crandall <Bob_Crandall~admin.state.ak.us>
Tom Maunder <tom_maunder~admin.state.ak.us>
This is an interesting situation because it's typical for Kuparuk, West
Sak, Ugnu and Sagavanirktok pay in the Western Prudhoe Bay and Eastern
Kuparuk River Units. Large volumes ofbiodegraded oil in the mid twenty
to mid teen api range are present in fault controlled accumulations
throughout this area. Taken together this fairway holds billions of
barrels. Problems related to complex pay distribution, high viscosity
oil and low reservoir temperatures will strongly affect ultimate
recovery here but even so we've had recent estimates of up 400 PBU wells
being drilled from 4 new pads and existing infrastructure in this
trend.
In this case Tom was looking at a Z-pad Kuparuk River pool (fault
separated from the S-pad Kupamk River pool?) well design. We checked
an adjacent expl. well (Highland St.) and found lots of oil in the West
Sak, a little in the Ugnu and a big fat oil sand in the Sagavanirktok (@
3200' md) The Sag oil is probably cold and thick but we have always
treated these a potential resource, even though the operators frequently
object. This well was less than a mile from Z-pad. Wells on Z-pad have
oil in only a few West Sak sands and the overlying section is wet.
This is an interesting area and is one we need to pay attention to.
Tom Maunder wrote:
Bob,
Here is the note from Bill Isaacson regarding their finding of no
hydrocarbon in the Ugnu.
Tom
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
Subject: Re: Z-101 Intermediate Cementing
Date: Fri, 13 Oct 2000 08:56:03 -0800
From: Tom Maunder <tom_maunder~admin.state.ak.us>
To: "Isaacson, William S" <IsaacsWS@bp.com>
References: <D585E208DC48D0119FEA0000F8023FD7028CB057~AMANCX3>
Bill,
Thanks for this information, I will get with Bob Crandall on it. It looks like
you have done your upfront work and I don't think there will be anything further
necessary. One item I will need to add to the package is the postable hazards
note. You can get with Allen for an example. The section you have in the
package you prepared is good, but we do like to see a bullet type that can be
posted in the doghouse. You can send it by email and I will add it to the
package. Thanks again, give a call if you have any questions.
Tom
"Isaacson, William S" wrote:
>
>
>
>
Tom,
This note is to confirm our conversation of Wednesday October 11, 2000,
regarding intermediate casing cementing requirements on the Z-101 well. As
we discussed, the need to bring cement above the Ugnu reservoir section,
because of producible hydrocarbons, should not be required. This issue was
researched thoroughly in the well planning process because of the
hydrocarbons encountered while drilling the Ugnu intervals in the recent
Aurora S-Pad wells.
Several wells in the Z-Pad area with logs across the Ugnu intervals were
reviewed. Those wells which originated from Z-Pad (Z-35, Z-08, & Z-03) show
no signs of producible hydrocarbons from the Ugnu intervals. As per the
Gologists and Reservoir Engineers, the Ugnu in this area is wet and believed
to be down in the water aquifer. In regards to your questions of the
hydrocarbons found within the Ugnu interval at-3200' TVDss in the offset
well 'Highland State'. It is believed that there is a large fault between
the Z-Pad Ugnu penetrations and the Highland State Ugnu penetration. The
interval you reference in the 'Highland State' well at -~3200' TVDss, is
found approximately 230' TVD deeper in the Z-Pad and planned Z- 101
penetrations, thus placing them down in the water aquifer.
Therefore, as per the proposed cementing design submitted in the Z-101
Permit to Drill, we will plan to bring cement ~-500' above the Schrader
interval and leave the Ugnu uncovered. If further information is required
to meet your approval of the proposed plan, please contact me and I can do
what we need to do. Thanks!!
William S. Isaacson
Alaska Drilling & Wells
Phone: (907) 564-5521
Fax: (907) 564-4040
E-mail: IsaacsWS~BP.com
Tom Maunder <tom_rnaunder~admin.state.ak.us>
Petroleum Engineer
Alaska Oil and Gas Conservation Commission
Tom Maunder
> Petroleum Engineer
<tom_rnaunder@admin.state.ak.us>
> Alaska Oil and Gas Conservation Commission
> 3001 Porcupine Dr.
> Anchorage
> AK
> 99501
> USA
> Additional Information:
> Last Name Maunder
> First Name Tom
> Version 2.1
Fax: 907 276-7542
Work: 907 793-1250
Conference Software Address
>
>
>
Tom Maunder <tom_rnaunder@admin.state.ak.us>
Petroleum Engineer
Alaska Oil and Gas Conservation Commission
Tom Maunder
Petroleum Engineer
<tom_maunder@admin. state, ak. us>
> Alaska Oil and Gas Conservation Commission
> 3001 Porcupine Dr.
> Anchorage
> AK
> 99501
> USA
> Additional Information:
> Last Name Maunder
> First Name Tom
> Version 2.1
Fax: 907 276-7542
Work: 907 793-1250
Conference Software Address
Z-101 Permit to Drill
I Well Name: 1 Z-101
Drill, Core, and Complete Plan Summary
I Type of R~rill (producer or injector): I Producer
Surface Location: x = 599,659 / Y = 5,959,360
722'FNL 1938'FWL S19TllNR12E Umiat
Target Location: x = 596,318 / Y = 5,964,654
664'FNL 1333'FEL S13TllNR11E Umiat
Bottom Hole Location: x = 596,283 / Y = 5,964,778
540' FNL 1366' FEL S13T11N R11E Umiat
I AFENumber: 15M4003
I Estimated Start Date:I 1 1/10/00
I MD: I~ 0,0~z I I ~VD.' I ~0~'
I Rig: I Nabors7ES
I Operating days to complete: 124
I BF/MSL: 155.2' I RKB:
1 84.0'
I Well Design (conventional, slimhole, etc.)' I Ultra-Slimhole
I Objective: I
Development appraisal well for Northwest Eileen Kuparuk Structure
RECEIVED
OCT 0
Mud Program:
A!aska 0ii & ,'.:,.,: .:,'. Co,%. C0mmissiorl
Ancho~'age
Surface Hole Mud Properties: Fresh Water Spud 12-1/4" Hole Section
From Surface to -4375' MD'/3129' TVD (-230' TVD below top SVl).
Interval Density (ppg) Viscosity YP LSR YP Gel APl FL
(seconds) 10 sec
Initial 9.4 to 9.8 250 - 300 50 - 70 30 - 40 35 - 55 12 - 15
SV3 10.2 150-200 50 - 30 18 - 11 20 - 35 6 - 8
Interval TD 10.2 75-100 20 - 35 8 - 15 20 - 35 6 - 8
Production Hole Mud Properties' LSND / 6% KCl 8-3/4" Hole Section
APl FL
LSND Mud System
From Surface Casing Shoe to 9200' MD / 6206' TVD (-200' MD above top HRZ).
9.0 to 9.8 I 45 - 55 23 - 28 10 - 17 3 - 7 9 - 9.5 <10 to 6
Open Hole Displacement to 6% KCl/Polymer Coring Fluid
From 9200' MD / 6206' TVD to interval TD.
10.2 to 10.3 18 - 23 13 - 15 3 - 7 9 - 9.5 +/-10
40 - 50
Z-101 Permit to Drill
Directional:
KOP: I 250' MD
Maximum Hole Angle:
Close Approach Well:
Surface - 58.8° In Tangent Interval 2417' to 4375' MD
Production - 58.8° In Tangent Interval 4375' to 6989' MD
All wells pass BP Close Approach guidelines. The nearest close approach
well is Z-26, which is 91.5' well-to-well at 700' MD.
Survey Program: Standard MWD Surveys from surface to TD. No gyros will be needed for
surface kick-off.
Logging Program:
Surface Hole Section
Production Hole Section
Drilling: MWD / GR
Open Hole: None
Cased Hole: None
Drilling:
Open Hole:
Cased Hole:
MWD ! GR / Resistivity
GR / Res ! Den / Neu (across Schrader & Kuparuk)
CMR / Sonic (across Schrader & Kuparuk)
RFT (Pressures in Schrader & Kuparuk, fluid samples
in Kuparuk only)
Percussion SWC's (From Schrader Bluff interval only)
None
RECEIVED
Formation Markers'
· OC,T
Formation Tops MD TVDss Comments '~" ~ '" .......... '~'
Base Permafrost 1914' 1700' ~,,,,,~,.,, ~ ~ ~..-...~,~.~ ¢"i",r~'~,~ ~";,[--~t..~l~-r[[iS~('~i~)n
SV3 / T5 2648' 2149' ,-~,,,o,~,, .... ~.n~.hr~'a0e
SV2 / T4 3251' 2462'
SVl / T3 3933' 2816'
--
UG4 / K15-C1 4666' 3196' Est. pore pressure 1500 psi (9.0 ppg EMW) ....
UG3 5348' 3550'
UG1 / UgS 6143' 3962'
WS2 6755' 4280' Est. pore pressure 2000 psi (9.o ppg EMW)
WSl / West Sak 7165' 4497' Est. pore pressure 2105 psi (9.o ppg EMW)
CM3 / K-12 7580' 4757'
CM2 / K-10 8123' 5161'
CM-1 / K5 5798'
K2/Top HRZ 9403' 6314'
Top Kuparuk 9696' 6591' Est. pore pressure 3400 psi (9.9 ppg EMW)
Miluveach 9891' 6776'
Top Kingak (JG) Not Penetrated
Sag River Not Penetrated
Shublik Not Penetrated
Top Sadlerochit / Z4B Not Penetrated
Top Z4A Not Penetrated
Maximum TVDss Not Penetrated
T41 N Not Penetrated
HOT Not Penetrated
OOWC Not Penetrated
Z-101 Permit to Drill
Casin I/Tubinq Proqram:
~1w ~ V
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MD/TVD MD/TVD
12-1/4" 9-5/8" 40# L-80 BTC 4345' 30'/30' 4375'/3129'
8-3/4" 7" 29# L-80 BTC-M . 10,062' 30'/30' 10,092'/7049'
Tubing 3-1/2" 9.3# L-80 8rd-Mod 9,517' -28'/28' 9545'/6532'
Cement Calculations:
The following cement calculations are based upon a two stage job using a stage tool. If a port collar is run
rather than a stage tool, circulating cement to surface will be attempted using a sin. gle stage job. Cement
volumes under this scenario will be as follows: Lead - as noted for both 1st and 2no stage. Tail - as noted
below for 1st stage.
Casing Size I 9-5/8" Surface - 1s' Stage I
Basis: Lead: Based on 1375' of open hole from top of tail slurry to stage collar + 30% excess.
Lead TOC: At -2200' MD (1987' TVD), planned set depth of stage tool.
Tail: Based on 800' MD (-415' TVD) open hole volume + 30% excess + 80' shoe track volume.
Tail TOC: At -3575' MD (2766' TVD).
ITotal Cement Volume: Lead I 100 bbl / 562 f¢ / 127 sks of Dowell ARTICSET Lite 3 at 10.7
ppg and 4.44 cf/sk.
Tail 65 bbl / 365 f¢ / 315 sks of Dowell Premium 'G' at 15.8 ppg
and 1.16 cf/sk.
Casing Size I 9-5/8" Surface - 2® Stage
Basis:
Lead TOC: At surface.
Tail: None
Tail TOC: N/A
Total Cement Volume:
Lead: Based on 2200' of open hole from stage collar to surface + 200% excess + 9-5/8" casing
capacity from surface to stage tool.
Lead
Tail
535 bbl/3004 f¢ / 677 sks of Dowell ARTICSET Lite 3 at 10.7
ppg and 4.44 cf/sk.
None
Casing Size 17'' Production I ...~ v,j~o,¥ c~ k_~-,,,,.~ '~,
Basis: Lead: Based on 2450' of open hole (to 500' MD above top Schrader Bluff) with 80% excess.
Lead TOC: At -6250' MD (4102' TVD).
Tail: Based on 82' shoe track volume and 1395' of open hole (to 1000' MD above top Kuparuk
formation) with 35% excess.
Tail TOC: At -8700' MD (5740'
ITotalcementvolume: I Lead I
TVD).
118 bbl / 663 f¢ / 174 sks of Dowell Premium 'G' at 11.0 ppg and
3.82 cf/sk.
54 bbl / 303 f¢ / 259 sks of Dowell Premium 'G' at 15.8 ppg and
1.17 cf/sk.
.,
Z-101 Permit to Drill
Well Control:
Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and
annular preventer will be installed and is capable of handling maximum potential surface pressures.
Based upon calculations below BOP equipment will be tested to 3500 psi.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Intermediate/Production Section-
. Maximum anticipated BHP: 2000 psi @ 4280' TVDss - West Sak
· Maximum surface pressure: 1572 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
Maximum anticipated BHP: 3400 psi @ 6591' TVDss - Kuparuk
Maximum surface pressure: 2741 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
· Planned BOP test pressure:
· Planned completion fluid:
3500 psi
8.7 ppg 6% KCl / 6.8 ppg Diesel
Drilling Hazards/Contingencies:
HYDROGEN SULFIDE - H2S
· Z Pad is not designated as an H2S drill site, however Standard Operating Procedures for
H2S precautions should be followed at all times. The highest level of H2S ever measured on
Z Pad has been 21 ppm from Z-18.
DRILLING CLOSE APPROACH:
· All wells pass close approach guidelines.
SURFACE HOLE SECTION:
· Z Pad has a history of gas hydrate problems while drilling both the surface and intermediate hole
sections. On the three most recent Z Pad wells gas hydrate problems were minimized in the
surface hole and basically eliminated from the intermediate section. By setting the surface
casing deeper, down below the SV1 sands rather than above the SV2 sands, hydrates were
eliminated from the intermediate hole. In the surface hole, hydrate gas was minimized by
bringing the mud weight to 10.2 ppg by the Base Permafrost and by pretreating the mud system
with 2 ppb Driltreat (Lecithin). Additional measures include reducing flow rates to ~450 to 500
gpm and keeping the mud temperature cool.
· Minor tight hole has been encountered in the clay sections below the permafrost.
· Differential sticking could be problematic in this hole section adjacent to the permeable SV
Sands. Avoid leaving drill string stationary for extended periods, tighten fluid loss properties of
mud, and string in Barofibre prior to penetrating sand intervals.
· Lost circulation has not been a problem while drilling in the surface section, however losses have
occurred while running and cementing surface casing. Be sure to condition and thin mud
Z-101 Permit to Drill
appropriately prior to pulling out of the hole to run casing, and once on bottom with casing, bring
circulation up slowly and reduce mud viscosities before pumping cement.
INTERMEDIATE / PRODUCTION SECTION:
· Gas cut mud has been observed in the Ugnu (3196' TVDss) and West Sak (4280' TVDss)
sands. This will be controlled with appropriate mud weights. A minimum of 9.3 ppg is
recommended.
· The Z-101 well path will drill a full section of the HRZ shale. The HRZ has not proven
troublesome in the Z Pad area, however precautions will be taken to aid in shale stabilization.
Increased mud weights and inhibitive drilling fluids will be used.
· The shallow intervals beneath Z Pad are highly faulted. These faults have a history of being
conductive and have resulted in several lost circulation incidents. As planned, the Z-101 well
path should not cross any faults and has been optimized to avoid cutting any permeable sands
near the damaged zones of these faults. However, the possibility of encountering losses still
exists. To be prepared for any potential lost circulation, a copy of the 'Recommended Lost
Circulation Procedures' and the 'Lost Circulation Decision Tree' will be sent to the rig prior to
drilling out in the 8-3/4" production interval.
· Differential sticking will be a problem if lost circulation is occurring or if the drill string is left
stationary for an extended period or time across the permeable Schrader Sands.
· The kick tolerance for the 8-3/4" open hole section would be 55 bbls assuming an influx from the
Kuparuk interval at -9696' MD. This is a worst case scenario based on a 9.9 ppg pore pressure
gradient, a fracture gradient of 12.5 ppg at the 9-5/8" shoe, and 10.3 ppg mud in the hole.
Disposal:
· No annular injection in this well.
· Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject
at DS-04. Any metal cuttings will be sent to the North Slope Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for
injection. Haul all Class I wastes to Pad 3 for disposal.
Pre-Ricl Work:
1. Set 20" conductor and weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move.
RiR Operations:
1. MIRU Nabors 7ES.
2. Nipple up and function test 21-1/4" diverter system. PU 5" DP as required and stand back in derrick.
3. MU 12-1/4" drilling assembly with MWD/GR and directionally drill surface hole to approximately 4375'
MD / 3129' TVD. The actual surface hole TD will be +/-230' TVD below the top of the SV1 sands.
4. Run and cement the 9-5/8", 40# surface casing back to surface. A port collar or stage tool will be run
in the casing to allow for secondary cementing if cement is not circulated to surface during primary
cementing operations.
5. ND diverter system and NU casing / tubing head. NU BOPE and test to 3500 psi.
6. MU 8-3/4" drilling assembly with MWD/GR/Res and RIH to float collar. Test the 9-5/8" casing to 3500
psi for 30 minutes.
7. Drill out shoe joints and displace well to LSND drilling fluid. Drill new formation to 20' below 9-5/8"
shoe and perform Leak Off Test.
8. Drill ahead to approximately 200' of the top HRZ and perform openhole mud changeover from LSND
to 6% KCI GEM mud system. Short trip as required.
9. Continue to drill ahead to core point at approximately 9694' MD / 6673' TVD (desired core point is
within a couple feet of the top Kuparuk in order to capture the transition interval between HRZ and
Kuparuk). POOH.
10. Core approximately 180' of 4" full diameter core across the Kuparuk interval. Base plan is to obtain
the core with two 90' core barrel runs.
11. MU 8-3/4" drilling assembly with MWD/GR and RIH. Drill -200' of rat hole below the Kuparuk as
required for logging. Condition hole for logging and POOH.
12. RU Schlumberger E-line unit. Make two logging runs across both the Kuparuk and Schrader intervals
consisting of: #1 - PEX with Micro Resistivity + CMR, #2 - RFT & Compressional Sonic. Make a
third logging run to obtain percussion SWC's across the Schrader interval. POOH and RD
Schlumberger.
13. RIH with 8-3/4" cleanout assembly and condition hole for running the 7" casing. POOH laying down
the 5" DP.
14. Run and cement the 7", 29# production casing as required to cover all significant hydrocarbon
intervals. Displace the 7" casing with 6% KCI completion brine during cementing operations and
freeze protect the 7" x 9-5/8" annulus as required.
15. Test the 7" casing to 3500 psi for 30 min.
16. Run the 3-1/2", 9.3#, L-80 8rd-Mod gas lift completion assembly. Set packer and test the tubing to
3500 psi and annulus to 3500 psi for 30 minutes.
17. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
18. Freeze protect the well to -2200' and secure the well.
19. Rig down and move off.
Post-Ric~ Work:
1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the new production packer.
2. RU E-line and perforate Kuparuk interval with E-line conveyed guns.
3. Perform fracture stimulation on Kuparuk interval as required.
Z-101 Permit to Drill
Estimated Pre-rig Start Date:
Estimated Spud Date:
11/01/00
11/10/00
William Isaacson
Operations Drilling Engineer
564-5521
NWE Z-101 Proposed Completion
TREE: 4-1/16" - 5M CIW L-80
WELLHEAD: 11" - 5M FMC G5
9-5/8", 40 #/ft, L-80, BTC
I
I I
L
L
I
! ·
'1
Plug Back Depth 110,007'I
7", 29 #/ft, L-80, BTC-Mod
Cellar Elevation = 54.0'
Nabors 7ES RKB = 84.0'
3-1/2" 'X' Landing Nipple with 2.813" seal bore. I 2200'
3-1/2" x 1-1/2" Camco 'MMG' Gas Lift Mandrels with handling pups installed.
GAS LIFT MANDRELS
.................... -~i-ze ........... I .... ~l~e~-ryp'e
/
TBD 1-1/2" [ RP Shear
TBD 1-1/2'I / DV
TBD 1-1/2' / DV
TBD 1-1/2" ~ DV
3-1/2" 9.3# L-80, EUE 8rd-Mod Tubing
3-1/2" 'X' Landing Nipple with 2.813" seal bore.
7" x 3-1/2" Baker 'S-3' Production Packer
3-1/2" 'XN' Landing Nipple with 2.813" seal bore and 2.725" No-Go ID.
3-1/2" WireLine Entry Guide set at +/-9545' (-150' above the Kuparuk Formation).
Date
9/19/00
Rev By Comments
WSI Proposed Completion
NWE
WELL: Z-101
APl NO: 50-029-?????
BP Alaska Drilling & Wells
Shared Services Drilling
Dir @ 1.000°/100ft: 250.00ft MD, 250.00ft TVD
Dir Rate @ 2.000°/100ft: 450.00ft MD, 449.96ft TVD
in Dir Rate @ 2.500°/100ft: 650.00ft MD, 649.43ft TVD
in Dir Rate @ 3.000°/100ft: 850.00ft MD, 847.17ft TVD
1250
Z-101 Wp 04
End Dir: 1842.42fl TVD
Dir @ : 1942.42ft MD 1805.73ft TVD
.41.f.LMD, .!879.7_1.ft.T_VD .......................................
Dir: 2416.96ft MD, 2113.42ft TVD ~ ~-;.~.~
I DrillQuest'
Proposal Data for Z-101 Wp 04
vertical Origin:Well
Horizontal Origin: Well
Meas~xement Un~s:
11
North Reference:True North
Dogleg severity:Degrees per 100ft
Vertical Section Azimuth: 328.823°
Vertical Section Descript.~rr Well
Vertical Seclion Origin: 0.00 N,O.00 E
Measured Incl. Azlm. Vertical Northlngs Eeanng. VerticalDogleg
Depth Depth Section Rate
o.oo o.ooo 0.76o o.o0 o.m~ N o 1~} F. 0.0o
250.0~ O.C~O O.7~ 2~.1~ I1.~) N O.(X}F. IL(X}
450.~ 2.~ 326.928 ~9.96 2 92 N I.~l W 3.,19
650.~ 6.~ 326.928 ~9.43 14.61 N 9.52 W 17.,13
g50.~ I 1.~ 326.928 ~7.17 39. t8 N 25.~ W 46.97
1~2.42 40.772326.928 17.~} I~ 398.38 N 259.43 W 475.15
1~2.42 40.772326.92g 1805.73 453.11 N 295.~} W g10.42 03~}
2~2.41 43.772326.928 1879.71 ~.47 N 331.76 W ta~1.63
2416.9658.7~ 326.928 2113.42 753.6O N .It~.74 W898.80 4.{~g}
6215.945g.7~ 326.928 4084.(~ M75.32 N 2263.1 I W 4144.96
~89.01 5g.7~ 326.928 ~85.~1 4029.17 N 2623.78 W.1805,53O.~g~l
~38.62 18.~6 ~.799 ~53.~ 5131.91 N 3214.55 W60~.g4
9685.86lg.~6 ~.7t~ ~5.52 5334.70 N 32~1.65 W6256.86
9~5.88 18.~5 ~.7t~ ~5.~ 5334.71 N 32¢9.65 W6256.87
9695.88Ig.~5 ~.7t~ ~753~ 5~37,84 N 3270.~ W 62593~ 0.{~
9891_48 Ig.~5 ~.799 &g~).(~l 53~).12 N 3287.15 W6321.(~t(I (~1
1~1.48 18.~5 ~.7~ 71g~9.16 ~61.78 N 331H,Ig W6393,47
25OO
· .= 3750
>
5OOO
~ 6250
II
._
',1--
--
.................. S;-:~' Current Well Properties
:.~£3.L0~') Well: Z-101 NewLec
SV2 Horizontal Coordinates:
25-:rJ t~) Ref. GIo~al Coordinates: 5959360.00 N, 599659.00 E
· -- Ref. Slructu*e Reference : 2151.41 N, 1613.04 W
.......... .9.5/_8." .C. _a{l!n_ g ............................................................... Rel. Geographical Coordinates: 70° 17' 542139' N. 149' 11' 34.5052' W
4374.84 MD S?i RKB Elevation: 84.00fl above Mean Sea Level
3129.00 TVD 29(~C.(:0 84.00fl above Slru:ta'e Reference
7'~:0~ ,",:~' ~ ,['' Nodh Reference: True Nodh
..................................................... egin.-Dir @ .2.00Ot/100ft ?~6989.01 ft M D, 4485.00ft TVD
.................................................................................................. '~ ......................... ~.i~?'F'"'" I Single Well Target Data for Z-lO, New Loc
~ ;'-~' ~ ~'~ I Target Point TVDrkb TVDiI Ea~Ungl ASP Y ASP X
,~,- ..: -A,<- Name Type Norlhlng a
~ ........ I Boonda/y Poinl ^ 40X4.O0 4(~10.00.162k32 N 2111.]4 W 5962955 I~1NS,775aXMH} E
C 4094.00 40i~1.0~! ~:127.:12 N 2415.f~,~ W 5~,~2655.(~7 N~'~721Xl.IX) Ii
\/End Dir: 9038.62ft MD, 6053.34ft TVD
10091.48 MD
7049.1 6 TVD
0 1250 2500 3750 5000 6250
Scale: linch = 1250ft Section Azimuth: 328.823° (True North)
Vertical Section
Prepared: Checked: ~Approved:
Target
Shared Services Dri{i,,ng
Z-101 Wp 04
I DriHQuesf
1:::
o
Z
0
C)
O0
II
.--
56OO
48OO
4OOO
32OO
24OO
1600
800
Scale: linch = 800ft Eastings
-3200 -2400 -1600 -800 0
I I I
7" Casing __
,,~..~. 10091.48 MD
7049.16 TVD
nd Dir: 9038.62ft MD, 6053.34ft TVD
800.00
egin Dir @ 2.000°/100ft· 6989.01ft MD, 4485.00ft TVD
--
'~.~ 2oo,oo
\
\
~900.00
11 13oo,oo
Slflgie Will Tmrgel Dill for Z-101 NiwLoc
~' ....... "~"'~ " X 9 5/8" Ca$in9
I .... ~"" ..... ~ ................................. ~, 4574.84 ME)
!:::::',',:',:: ::::::',: :::::,:',',',', ',::::::: :r,,:,:: :::::::::',::::::,:::',::: i!i.
I Well: Z-101 NewLoc
i Horizontal Coordinates: '~ oo oo
Ret. Global Coordinates: 5959360.00 N, 599659,00 E
Ret. Structure Reference : 2151.41 N, 1613.04 W
Ret. Geographical Coordinates: 70* 17' 54.2139* N, 149° 11' 34.5052" W
RKB Elevation: 84.00ft above Mean Sea Level
84.0C~t above Structure Reference ~' 4oo,oo~4o
North Reference: True North
Units: Feet
End Dir: 2416.96ft MD, 2113.42ft TVD
· ease in Dir Rate @ 4.000°/100ft: 2042.41ft MD, 1879.71ft TVD
Begin Dir @ 3.000°/100ft: 1942.42ft MD, 1805.73ft TVD ~7oooo
End Dir: 1842'42ft MD, 1730'00ft TVD --------
Increase in Dir Rate @ 3.000°/100ft: 850.O0ft MD, 847.17ft TVD
Increase in Dir Rate @ 2.500/100ft: 650.00ft MD 649.43ft TVD ~--./
Increase in Dir Rate @ 2.000°/100ft: 450.00ft MD', 449.96ft TVD
Begirl Dir @ 1.000°/100ft: 250.00ft MD. 250.00ft TVD"
I I I I
-3200 -2400 -1600 -800 0
Scale: linch = 800ft Eastings Reference is True North
56OO
4800
4000
32OO
24OO
1600
8OO
o
Z
Prepared: Checked: ~pproved:
North Slope Alaska
Alaska State Plane 4
PBU_ WOA Z Pad
Z- 101 NewLoc - Z- 101 WP04
PROPOSAL ..R ORT
19 September, s.2000
Surface Coordinates: 5959360.00 N~ii:ii!.i-59965§.00 E (70° 17' 54.2139" N, 149° 11' 34.5052" W)
Kelly Bushin~,:84;OOfl above Mean Sea Level
Proposal Ref: pro 10447
Sperry-Sun Drilling Services
Proposal Report for Z- 101 NewLoc - Z- 101 Wp 04
North Slope Alaska
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
0.00 0.000 0.000 -84.00
250.00 0.000 0.000 166.00
300.00 0.500 326.928 216.00
400.00 1.500 326.928 315.98
450.00 2.000 326.928 365.96
500.00 3.000 326.928
600.00 5.000 326.928
650.00 6.000 326.928
700.00 7.250 326.928
800.00 9.750 326.928
850.00 11.000 326.928
415.91 499.91 4.75 N
515.66 599.66 10.60 N
565.43 649.43 14.61N
615.10
713.99
763.17
900.00 12.500 326.928 812.12
1000.00 15.500 326.928 909.14
1100.00 18.500 326.928 1004.76
1200.00 21.500 326.928 1098.72
1300.00 24.500 326.928 1190.76
1400.00 27.500 326.928 1280.63
1500.00 30.500 326.928 1368.08
1600.00 33.500 326.928 1452.88
1700.00 36.500 326.928 1534.78
1800.00 39.500 326.928 1613.57
1842.42 40.772 326.928 1646.00
1900.00 40.772 326.928 1689.61
1913.72 40.772 326.928 1700.00
1942.42 40.772 326.928 1721.73
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
0.00 0.00 N 0.00 E 5959360.00:N' 599659.00 E
250.00 0.00 N 0.00 E 5959360;~ N 599659.00 E
300.00 0.18 N 0.12 W 59.5~60.18 N.:: :..;i :,::... 599658.88 E
399.98 1.65 N 1.07 W :5959361~63 N 599657.91 E
449.96 2.92 N 1.90 W : :59593~.90 N 599657.06 E
::-+i{-':.!~ :<;::i: ::}::':: .
3.09 Hi- ;;!; ~:~;;5959364.71 N 599655.84 E
:~:~::~::: .: ~::.:~: .~:~ ·
.~: 6;90 W N 599651.96 E
?::::;ii??'i':~:'i~ W5959374.49 U 599649.29 E
· ,,.
W ...... 5959379.28 N 599646.08 E
W 5959391.55 N 599637.85 E
699.10
797.99
847.17 39.38i:N? ..... ~.i~. :.i::25.64 W 5959399.03 N 599632.84 E
-: ;;~ ~;~ ::. . :..-. :..
896.12 47.91 N :'.:i :;*31.20 W 5959407.49 N 599627.17 E
993.14 68.18 N 44.40 W 5959427.59 N 599613.70 E
1088.76 92.68 N 60.35 W 5959451.87 N 599597.42 E
1182.72 121.34 N 79.01 W 5959480.28 N 599578.38 E
1274.76 154.07 N 100.33 W 5959512.73 N 599556.63 E
1364.63 190.81 N 124.25 W 5959549.14 N 599532.23 E
1452.08 231.43 N 150.70 W 5959589.41 N 599505.24 E
1536.88 275.83 N 179.62 W 5959633.42 N 599475.74 E
1618.78 323.89 N 210.91 W 5959681.06 N 599443.81 E
1697.57 375.47 N 244.51 W 5959732.20 N 599409.54 E
1730.00 398.38 N 259.43 W 5959754.91 N 599394.31 E
1773.61 429.90 N 279.95 W 5959786.15 N 599373.38 E
1784.00 437.41 N 284.84 W 5959793.59 N 599368.39 E
1805.73 453.11 N 295.06 W 5959809.16 N 599357.95 E
Dogleg
Rate
(°/100ft)
0.000
1.000
1.000
1.000
2.000
2.000
2.000
2.500
2.500
2.500
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
0.000
0.000
0.000
Alaska State Plane 4
PBU_WOA Z Pad
Vertical
Section
(ft)
0.00
0.00
0.22
1.96
3.49
5.67
12.64
17.43
23.19
37.97
46.97
57.14
81.32
110.54
144.72
183.76
227.57
276.02
328.98
386.30
447.82
475.15
512.73
521.69
540.42
Comment
Beain Dir @ 1.000°/100ft:
250.00ft MD, 250.00ft TVD
Increase in Dir Rate @
2.000°/100ft · 450.00ft MD,
449.96ft TVD
Increase in Dir Rate @
2.500°/100ft: 650.00ft MD,
649.43ft TVD
Increase in Dir Rate @
3.000°/100ft · 850.00ft MD,
847.17ft TVD
End Dir · 1842.42ft MD,
1730.00ft TVD
B Perm
Beqin Dir @ 3.000°/100ft:
1942.42ft MD, 1805.73ft TVD
Continued...
19 September, 2000- 11:27 - 2 - DrillQuest 1.05o05a
Sperry-Sun Drilling Services
Proposal Report for Z-101 NewLoc - Z-101 Wp 04
North Slope. Alaska
Measured Sub-Sea
Depth Incl. Azim. Depth
(~) (~)
2000.00 42.500 326.928 1764.77
2042.41 43.772 326.928 1795.71
2100.00 46.076 326.928 1836.49
2200.00 50.076 326.928 1903.29
2300.00 54.076 326.928 1964.74
2400.00 58.076 326.928 2020.54
2416.96 58.754 326.928 2029.42
2500.00 58.754 326.928 2072.49
2600.00 58.754 326.928 2124.37
2647.49 58.754 326.928 2149.00
2700.00 58.754 326.928 2176.24
2800.00 58.754 326.928 2228.11
2900.00 58.754 326.928 2279.98
3000.00 58.754 326.928 2331.85
3100.00 58.754 326.928 2383.72
3200.00 58.754 326.928 2435.59
3250.91 58.754 326.928 2462.00
3300.00 58.754 326.928 2487.46
3400.00 58.754 326.928 2539.34
3500.00 58.754 326.928 2591.21
3600.00 58.754 326.928 2643.08
3700.00 58.754 326.928 2694.95
3800.00 58.754 326.928 2746.82
3900.00 58.754 326.928 2798.69
3933.37 58.754 326.928 2816.00
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
·
1848.77 485.17 N 315.94 W 5959840.94 N 599336.65 E
...........
1879.71 509.47 N 331.76 W 59598~02 N 599320.51 E
1920.49 543.54 N 353.95 W 5959898.80 N 599297.87 E
.: :: ~::~:~' .
1987.29
2048.74
2104.54
2113.42
2156.49
22O8.37
2233.00
2260.24
2312.11
2363.98
2415.85
2467.72
2519.59
2546.00
2571.46
2623.34
2675.21
2727.08
2778.95
2830.82
2882.69
2900.00
605.88 N 394.55 W : ~59.~:!:59
671.97 N 437.58 W 5960026.11
753.60 N 490.74 .::i 5960107.02
813.09 N ;: 52g:~ W 5960166.00
1099.66 N:.ii:.i:? ........ ~ !i :.:..716.10 W
1171.31 U':~?'~: i'i::iii?i ~: 762.75 W
1242.95 N 809.40 W
5960450.07
5960521.09
5960592.11
1314.59 N 856.06W 5960663.12
1351.06 N 879.81W 5960699.28
1386.24 N 902.71W 5960734.14
1457.88 N 949.36W 5960805.16
1529.52 N 996.02W 5960876.18
1601.17 N 1042.67W 5960947.20
1672.81N 1089.33W 5961018.22
1744.45 N 1135.98W 5961089.24
1816.10 N 1182.63W 5961160.25
1840.00 N 1198.20W 5961183.95
N 599256.45 E
N 599212.54 E
N 599166.36 E
N 599158.31E
N 599118.78 E
N 599071.18 E
N 599048.58 E
N 599023.58 E
N 598975.98 E
N 598928.38 E
N 598880.78 E
N 598833.18 E
N 598785.59 E
N 598761.35 E
N 598737.99 E
N 598690.39 E
N 598642.79 E
N 598595.19 E
N 598547.59 E
N 598499.99 E
N 598452.39 E
N 598436.50 E
Dogleg
Rate
(°/100ft)
3.000
3.000
4.000
4.000
4.000
4.000
4.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Alaska State Plane 4
PBU_WOA Z Pad
Vertical
Section
(fi)
578.65
607.63
648.28
722.62
801.45
884.36
898.80
969.76
1055.21
1095.79
1140.65
1226.10
1311.55
1397.00
1482.45
1567.90
1611.40
1653.34
1738.79
1824.24
1909.69
1995.14
2O80.58
2166.03
2194.54
Comment
Increase in Dir Rate @
4.000°/100ft · 2042.41ft MD,
1879.71ft TVD
End Dir: 2416.96ft MD,
2113.42ft TVD
SV3
SV2
SV1
Continued...
19 September, 2000- 11:27 -3- DrillQuest 1.05.05a
Sperry-Sun Drilling Services
Proposal Report for Z- 101 NewLoc - Z- 101 Wp 04
North Slope Alaska
Measured Sub-Sea Vedical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
4000.00 58.754 326.928 2850.56 2934.56
4100.00 58.754 326.928 2902.43 2986.43
4200.00 58.754 326.928 2954.31 3038.31
4300.00 58.754 326.928 3006.18 3090.18
4374.84 58.754 326.928 3045.00 3129.00
4400.00 58.754 326.928 3058.05 3142.05
4500.00 58.754 326.928 3109.92 3193.92
4600.00 58.754 326.928 3161.79 3245.79
4665.95 58.754 326.928 3196.00 3280.00
4700.00 58.754 326.928 3213.66 3297.66
4800.00 58.754 326.928 3265.53 3349.53
4900.00 58.754 326.928 3317.40 3401.40
5000.00 58.754 326.928 3369.28 3453.28
5100.00 58.754 326.928 3421.15 3505.15
5200.00 58.754 326.928 3473.02 3557.02
5300.00 58.754 326.928 3524.89 3608.89
5348.41 58.754 326.928 3550.00 3634.00
5400.00 58.754 326.928 3576.76 3660.76
5500.00 58.754 326.928 3628.63 3712.63
5600.00 58.754 326.928 3680.50 3764.50
5700.00 58.754 326.928 3732.37 3816.37
5800.00 58.754 326.928 3784.25 3868.25
5900.00 58.754 326.928 3836.12 3920.12
6000.00 58.754 326.928 3887.99 3971.99
6100.00 58.754 326.928 3939.86 4023.86
6142.68 58.754 326.928 3962.00 4046.00
6200.00 58.754 326.928 3991.73 4075.73
6215.94 58.754 326.928 4000.00 4084.00
6300.00 58.754 326.928 4043.60 4127.60
6400.00 58.754 326.928 4095.47 4179.47
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
1887.74 N 1229.29 W 5961231 .~ N" 598404.79 E
1959.38 N 1275.94 W 5961302~'29 N 598357.19 E
2031.03 N 1322.60 W 596~73.31::N :.?: .....598309.59 E
2102.67 N 1369.25 W 5~?i444.33 598261.99 E
2156.29 N 1404.17 W ~1497,48 N ~ :::" 598226.36 E
2174.31 N 1415.90 W ..... 596~5;I..5.35 N 598214.39 E
2245.96 N 1462.56 Wi?'ii:i.:i'::'iiiii:'~-.,~596~:~'~;36 N598166.79 E
2317.60 N 1509.21 ~i':.i:-:i!:'.i::': i ::~96165~.38 N 598119.19 E
~:..: !~ ::! !~ :':~ i':;iii:"
2364.85 N 1539;98 W :-?i';i;?.ii:;5961704.22 N 598087.79 E
2389.24 N ~555;87: W :~.:ii!:.;i:~. 5961728.40 N 598071.59 E
.... -.i::i!:i.:':':?"!:''' ~;~:ii~'~:;i'?:~::~ ::i'!i':
2460.89 N .... ? 5961799.42 N 598023.99 E
.... ~:.
2532 53 N ~:.:.:'%'i.:;~ 16~9,.:17 W 5961870.44 N 597976.39 E
2604.17-:!~i':''~ ............. ~'ii;:i:: ~::~6~'~ W 597928.79 E
2675.~;:i~::.~.:~, ":ii~42.48 W 597881.19 E
2747.46 'Ni:?.ii:: i; ...... ii:~i~89.14 W 597833.59 E
2819.11 N ~; .... 1835.79W
2853.79 N 1858.37 W
2890.75 N 1882.44 W
2962.39 N 1929.10 W
3034.04 N 1975.75 W
5961941.46 N
5962012.48 N
5962083.49 N
5962154.51N
5962188.89 N
5962225.53 N
5962296.55 N
5962367.57 N
597785.99 E
597762.94 E
597738.39 E
597690.79 E
597643.19 E
3105.68 N 2022.40W 5962438.59 N 597595.59 E
3177.32 N 2069.06W 5962509.60 N 597547.99 E
3248.97 N 2115.71W 5962580.62 N 597500.39 E
3320.61N 2162.37W 5962651.64 N 597452.79 E
3392.25 N 2209.02W 5962722.66 N 597405.19 E
3422.83 N 2228.93W 5962752.97 N 597384.87 E
3463.90 N 2255.67W 5962793.68 N 597357.59 E
3475.32 N 2263.11W 5962805.00 N 597350.00 E
3535.54 N 2302.33W 5962864.70 N 597309.99 E
3607.18 N 2348.98W 5962935.72 N 597262.39 E
Dogleg
Rate
(°/100fi)
0.000
o.000
0.000
0.000
0.000
0.000
0.000
0.000
o.000
0.000
0.000
0.000
0.0o0
0.000
0.000
0.000
0.000
0.000
o.000
o.0o0
0.000
0.000
0.000
0.000
0.000
0.000
0.o00
o.000
0.000
0.ooo
Alaska State Plane 4
PBU_WOA Z Pad
Vedical
Section
(fi)
2251.48
2336.93
2422.38
2507.82
2571.78
2593.27
2678.72
2764.17
2820.52
2849.62
2935.07
3020.51
3105.96
3191.41
3276.86
3362.31
3403.67
3447.75
3533.20
3618.65
3704.10
3789.55
3874.99
3960.44
4045.89
4082.36
4131.34
4144.96
4216.79
4302.24
Comment
9 5/8" Casing
UG4A
UG3
UG1
Taraet - 7-101 Schrader,
Geo'logical
Continued...
19 September, 2000 - 11:27 - 4 - DrillQuest 1.05.058
Sperry-Sun Drilling Services
Proposal Report for Z-101 NewLoc - Z-101 Wp 04
North Slope Alaska
Measured Sub-Sea Ve~ical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
6500.00 58.754 326.928 4147.34 4231.34
6600.00 58.754 326.928 4199.22 4283.22
6700.00 58.754 326.928 4251.09 4335.09
6755.74 58.754 326.928 4280.00 4364.00
6800.00 58.754 326.928 4302.96 4386.96
6900.00 58.754 326.928 4354.83 4438.83
6989.01 58.754 326.928 4401.00 4485.00
7000.00 58.537 326.967 4406.72 4490.72
7100.00 56.561 327.332 4460.37 4544.37
7165.36 55.270 327.579 4497.00 4581.00
7200.00 54.586 327.714 4516.91 4600.91
7300.00 52.612 328.115 4576.25 4660.25
7400.00 50.639 328.538 4638.32 4722.32
7500.00 48.669 328.985 4703.06 4787.06
7580.42 47.085 329.365 4757.00 4841.00
7600.00 46.700 329.460 4770.38 4854.38
7700.00 44.733 329.967 4840.20 4924.20
7800.00 42.769 330.510 4912.43 4996.43
7900.00 40.807 331.096 4986.99 5070.99
8000.00 38.849 331.729 5063.78 5147.78
8100.00 36.894 332.419 5142.72 5226.72
8122.79 36.449 332.585 5161.00 5245.00
8200.00 34.943 333.174 5223.70 5307.70
8300.00 32.998 334.006 5306.63 5390.63
8400.00 31.059 334.930 5391.40 5475.40
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
3678.83 N 2395.64 W 5963006.73 N 597214.79 E
3750.47 N 2442.29 W 59630~5 N 597167.19 E
3822.11 N 2488.94 W 5963~,77 NI.- 597119.59 E
3862.05 N 2514.95 W 5~3188.36 N 597093.06 E
3893.76 N 2535.60 W [59632J9~79 N 597071.99 E
3965.40 N 2582,25 W:.:~..~ ~ 59632~),Sl N 597024,39 E
4029,17 N 2623,78 W';;i:.." ~.5963354,O2 N 596982,02 E
4037,04 N 26~,:.~)0 Wi:";: ;:! 5963361,82 N 596976,80 E
4107,92 N .... ~67~67~ W 5963432,09 N 596930,09 E
4153,55 N ~:i~703,79:W? ;i::.i..:5963477,33 N 596900,37 E
4177,50 N ........ 27~8:96 W ..... 5963501,08 N 596884,88 E
4245 69 ~i?:'i:"? i i~;ii:.::;;2~{ii~2 W 5963568,69 N 596841,22 E
:-.':'~:~'~i:'" .... :'~:~:::~:~:~:
4312.~i::N..:~ "~!i2802;88 W 5963634.86 N 596799.17 E
4377.56:':Ni:iii~ i:2842.41 W 5963699.48 N 596758.79 E
4428.78 N:'~i': ii.!iiii! i:i.iii!:i:'~872.98 w 5963750.29 N 596727.54 E
4441.09 N 2880.25W 5963762.50 N 596720.11E
4502.90 N 2916.36W 5963823.83 N 596683.18 E
4562.92 N 2950.69W 5963883.39 N 596648.06E
4621.09 N 2983.20W 5963941.12 N 596614.78 E
4677.32 N 3013.85W 5963996.94 N 596583.39 E
4731.55 N 3042.61W 5964050.79 N 596553.91E
4743.63 N 3048.89W 5964062.78 N 596547.47 E
4783.72 N 3069.43W 5964102.60 N 596526.40 E
4833.76 N 3094.29W 5964152.30 N 596500.88 E
4881.61 N 3117.16W 5964199.84 N 596477.38 E
Dogleg
Rate
(°/100fi)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
Alaska State Plane 4
PBU_WOA Z Pad
Ve~ical
Section
(~)
4387.68
4473.13
4558.58
4606.21
4644.03
4729.48
4805.53
4814.91
4899.26
4953.37
4981.72
5062.19
5140.58
5216.79
5276.44
5290.73
5362.31
5431.43
5498.03
5562.01
5623.29
5636.88
5681.81
5737.49
5790.27
Comment
WS2
Be~in Dir @ 2.000°/100ft:
6989.01ft MD, 4485.00ft TVD
WS1
CM3
OM2
Continued...
19 September, 2000 - 11:27 - 5 - DrillQuest 1.05.05a
Sperry-Sun Drilling Services
Proposal Report for Z-101 NewLoc - Z-101 Wp 04
North Slope Alaska
Measured Sub-Sea Vedical
Depth Incl. Azim. Depth Depth
8500.00 29.128 335.965 5477.92 5561.92
8600.00 27.205 337.132 5566.08 5650.08
8700.00 25.293 338.461 5655.76 5739.76
8800.00 23.395 339.992 5746.87 5830.87
8900.00 21.514 341.776 5839.28 5923.28
9000.00 19.656 343.881 5932.89 6016.89
9038.62 18.946 344.799 5969.34 6053.34
9100.00 18.946 344.799 6027.40 6111.40
9200.00 18.946 344.799 6121.98 6205.98
9300.00 18.946 344.799 6216.56 6300.56
9400.00 18.946 344.799 6311.14 6395.14
9403.02 18.946 344.799 6314.00 6398.00
9500.00 18.946 344.799 6405.73 6489.73
9600.00 18.946 344.799 6500.31 6584.31
9685.86 18.946 344.799 6581.52 6665.52
9685.88 18.945 344.799 6581.54 6665.54
9695.88 18.945 344.799 6591.00
9700.00 18.946 344.799 6594.89
9800.00 18.946 344.799 6689.48
9891.48 18.945 344.799 6776.00
9900.00 18.946 344.79g 6784.06
10000.00 18.945 344.799 6878.64
10091.48 18.945 344.799 6965.16
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (f) (ft)
4927.20 N 3138.00 W 5964245.!::6 N:' 596455.93 E
4970.50 N 3156.80 W 5964288720 ~:. 596436.56 E
5011.44 N 3173.53 W 5964328'~91N i: 596419.29 E
5049.96 N 3188.17 W 5~367.24 N ::: :;i:: :::: 596404.14 E
5086.04 N 3200.70 W ::i;~44~-15 N ..... 596391.14 E
5119.62 N 3211.10 W~. 59~436.58 N 596380.29 E
: ::,:: ~::~::
5131.91 N 3214.55 W::i:ii: ..i:~5964~;83 N 596376.68 E
5151.14 N 3219.77 W:':~: ;~ :~ :59~467.99 N 596371.20 E
5182.47 N ::3228"~ W '::: :.: 5964499.20 N 596362.27 E
5213.80 N .... 1'3236,~i~ .... 5964530.42 N 596353.34 E
5245.14 N?.:.;.:::.:.:;;.:..: 32~!57.31 W ...... 5964561.64 N 596344.42 E
5246.08N:":' '"":"..'::::"3245;'57 W 5964562.58 N 596344.15 E
.....: :...
5276.47:,N. ":~.:.3253.83 W 5964592.85 N 596335.49 E
..:::. ...... . .......
5307.80 N.::i:i:::!::... .:.:::3262.34 W 5964624.07 N 596326.56 E
5334.70 N"...: '.":;':i.-..... ::..:~269.65 W 5964650.87 N 596318.89 E
5334.71 N 3269.65 W 5964650.88 N 596318.89 E
6675.00 5337.84 N 3270.50W 5964654.00 N 596318.00 E
6678.89 5339.13 N
6773.48 5370.46 N
6860.00 5399.12 N
6868.06 5401.79 N
6962.64 5433.12 N
7049.16 5461.78 N
?D
3270.85W 5964655.28 N 596317.63 E
3279.36W 5964686.50 N 596308.70 E
3287.15W 5964715.06 N 596300.54 E
3287.88W 5964717.72 N 596299.78 E
3296.39W 5964748.93 N 596290.85 E
3304.18W 5964777.49 N 596282.68 E
Dogleg
Rate
(°/100fi)
2.000
2.000
2.000
2.000
2.000
2.000
2.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Alaska State Plane 4
PBU_WOA Z Pad
Ve~ical
Section
5840.07
5886.84
5930.53
5971.07
6008.42
6042.54
6054.84
6074.O0
6105.21
6136.42
6167.64
6168.58
6198.85
6230.06
6256.86
6256.87
6259.99
6261.28
6292.49
6321.04
6323.70
6354.92
6383.47
Comment
End Dir: 9038.62ft MD,
6053.34ft TVD
HRZ
Be(lin Dir @ 2.000°/100ft:
9685.86ft MD, 6665.52ft TVD
End Dir: 9685.88ft MD,
6665.54ft TVD
Kuparuk
Target - Z 1,01 Ku~ T, arg, ,
150.00 Ra(]ius., ~eo~og~caJ
Miluveach
Total Depth: 10091.48ft MD,
7049.16ft TVD
7" Casing
Continued...
19 September, 2000 - 11:27 f,?,':..:?iO;~,g.3 - 6 - DrillQuest 1.05.05a
Z-101 Ri.qsite
Summary of Drilling Hazards
POST THIS NOTICE IN THE DOGHOUSE
Z Pad is not designated as an H2S drill site, however Standard Operating
Procedures for H2S precautions should be followed at all times. The
highest level of H2S ever measured on Z Pad has been 21 ppm from 7-18.
Z Pad has a history of gas hydrate problems while drilling both the surface and
intermediate hole sections. On the three most recent Z Pad wells gas hydrate
problems were minimized in the surface hole and basically eliminated from the
intermediate section. By setting the surface casing deeper, down below the SV1
sands rather than above, hydrates were eliminated from the intermediate hole. In
the surface hole, hydrate gas was minimized by bringing the mud weight to 10.2
ppg by the Base Permafrost and by pre-treating the mud system with 2 ppb
Driltreat (Lecithin). Additional measures include reducing flow rates to -450 to
500 gpm and keeping the mud temperature cool.
The shallow intervals beneath Z Pad are highly faulted. These faults have a
history of being conductive and have resulted in several lost circulation incidents.
As planned, the Z-101 well path should not cross any faults and has been
optimized to avoid cutting any permeable sands near the damaged zones of
these faults. However, the possibility of encountering losses still exists. To be
prepared for any potential lost circulation, a copy of the 'Recommended Lost
Circulation Procedures' and the 'Lost Circulation Decision Tree' will be sent to the
rig prior to drilling out in the 8-3/4" production interval.
Gas cut mud has been observed in the Ugnu (3196' TVDss) and West Sak (4280'
TVDss) sands. This will be controlled with appropriate mud weights. A minimum
of 9.3 ppg is recommended.
The Z-101 well path will drill a full section of the HRZ shale. The HRZ has not
proven troublesome in the Z Pad area, however precautions will be taken to aid in
shale stabilization. Increased mud weights and inhibitive drilling fluids will be
used.
Differential sticking could be problematic in both hole sections. Avoid leaving drill
string stationary for extended periods, tighten fluid loss properties of mud, and
string in Barofibre prior to penetrating highly permeable sand intervals.
CONSULT THE S PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
Version 1.0 NWE Z-101 Hazards and Contingencies Page ! of 1
H 1 751 37 p~,,,~,~o~ I
, p0175:1.37
·
VENDOR
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
092600 ;KO92600A 100. O0 100. O0
PYMT C::3MMENTS' PERMI'T TD DRILL FEE
HANDLI,~Q INST' S/H TERRIE HUBBLE X4628
:
THE ATrACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. ~ 1 OO. OO I
:,~.':'~,o'~'~.:...~:::..***.~ NO. H 1::'-:7'-51
'T:-:"::.: -": :'? .~A~'!'~I~i~IATE. 0'~ --!:!!i:" :-' .... ? '"':' "' .... ' ' '
:~.%~::-'::. NA~'ION~[-:~IW..~K .:'': :' :: CONSO~]D~[DC~M~cI~'A
;:::'ih.? ' ':'~;~.:-:56-3897.];'~" -'-. -.: ';~0175137 ':' ':
412
...
,"~.:.-'... ~' ,' -':!. '--,.-'::!::::;" '....::.-::~- ::??;::.,. · ::~J~.-!.::--. ";.::?:i:!~:. ': ' '"' : '.':":":-
~-Y:' . '' ON'E:~.:"~N~'~:ED;;;}~ ;~;~.:-I :':'?' :'::':'' ''' '::::?~ ;}?;*: ~''~:':'':' :::::::::::::::::::::: '(" :':' '*':'""; ..... ':"::
:- :: *::;:: ::'-: .. ':, {~-~-' ;;.~---.:' ~}~*- --.::? ""-;:~'::.;~':-?-? O~/2~/OODATE ::?':}~;:: ....... '"'*]~;?" "::'~:;:" ' ['" :' '":(:~};'~MOUNT~Ioo, OO
A~ER 120 DAYS ..:..". ...-.. ':::' .'. -;..:" : :;:[. '..Z' ....
:...?::::,.::.. :-'::-.,-:.-- ..... :.:.? ::.::
:WELL PERMIT CHECKLIST
FIELD & POOL
COMPANY
ADMINISTRATION
R DATE
~/0. ~,c:~
:.NGINEERING
WELL NAME
INIT CLASS
1. Permit fee attached.
2. Lease number approl:;ri~t?~.
3. Unique well name and.number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary .... ..
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
GEOLOGY
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg .... ....
18. CMT will cover all known productive horizons ..........
PROGRAM: exp dev /reddl serv
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
31.
32.
33.
34.
ANNULAR DISPOSAL35. With proper cementing records, this plan
GEOLAREA
)N
)U
UNIT#
wellbore sag ann. disposal para req
ON/OFF SHORE
Casing designs adequate for C, T, B & permafrost ....... . - -
Adequate tankage or reserve pit ................. '
If a re-drill, has a 10-403 for abandonment been approved...
Adequate wellbore separation proposed .............
If diverter required, does it meet regulations .......... ~ N
Drilling fluid program schematic & equip list adequate .....
BOPEs, do they meet regulation ......... ~_.~. ..... (,.~} N
BOPE press rating appropriate; test to ~(~ ~ psig. ~) N yAb,,c>~_ ':. ;;)'h,~-~ \
Choke manifold complies w/APl RP-53 (May 84) ........ ~ N
Work will occur without operation shutdown ...........
Is presence of H2S gas probable ................. Y ~ .
Permit can be issued wlo hydrogen sulfide measures ..... ~ _ ., ,. . .
Data presented on potential overpressure zones ....... g./~v
Seismic analysis of shallow gas zones ........... '.~(~ Y N ~.~. ~'/~ ~"~'. '"'/
Seabed condition survey (if off-shore) ....... '.. ~ Y N
Contact name/phone for weekly progress reports [~ploratory only] Y N
(A) will contain waste in a suitable receiving zone; ....... Y N
(B) will not contaminate freshwater; or cause drilling waste... Y N
to surface; .
(C) will not impair mechanical integrity of the well used for disposal; Y N
Y N
APPR DATE
(D) will not damage producing formation or impair recovery from a
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412.
Y N
,/
GEOLOGY: ENGINEERING: Ul~,/~nnular COMMISSION:
Comments/Instructions:
z .(
O
ITl
c:\msoffice\wordian~diana\checklist (rev. 02117/00)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIXi
No'special'effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Mon Jan 28 11:37:02 2002
Reel Header
Service name ............. LISTPE
Date ..................... 02/01/28
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Coraments ................. STS LIS Writing Library.
Tape Header
Service name ............. LIST?E
Date ..................... 02/01/28
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
?rudhoe Bay Unit
MWD/MAD LOGS
WELL NAME:~
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MM-00308
R. KRELL
T. ANGLEN
Borealis Z-101
500292297800
BP Exploration (Alaska), Inc.
Sperry-Sun Drilling Services
28-JAN-02
MWD RUN 2 MWD RUN 3
AK-MM-00308 AK-MM-00308
M. HANIK R. KRELL
J. RALL W. STAFFORD
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
MAD RUN 3
AK-MM-00308
R. KRELL
W. STAFFORD
19
lin
12E
4557
3014
.00
81.80
53.30
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 12.250 20.000 110.0
2ND STRING 8.500 9.625 4294.0
3RD STRING
PRODUCTION STRING
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2.
ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH SUBSEA
(TVDSS),
PER REQUEST OF CUSTOMER.
3.
MWD RUN 1 WAS DIRECTIONAL WITH DUAL GAi~MA RAY (DGR,
UTILIZING
GEIGER-MUELLER TUBE DETECTORS).
4.
MWD RUNS 2 AND 3 COMPRISED DIRECTIONAL, DGR, AND
ELECTROMAGNETIC
WAVE RESISTIVITY PHASE-4 (EWR4).
5. THE INTERVAL 9537'MD/6587'TVDSS -
9655.5'MD/6687'TVDSS WAS CORED.
6. DATA OVER THE INTERVAL 9450'MD/6513'TVDSS -
9655.5'MD/6687'TVDSS
(INCLUDING THE CORED INTERVAL) WERE ACQUIRED ON A
MEASUREMENT
AFTER DRILLING (MAD) PASS WHILE RIH FOR MWD RUN 3.
7.
DIGITAL DATA ONLY ARE DEPTH-SHIFTED TO A
SCHLUMBERGER GAMMA RAY
PDC LOG (AIT) RUN ON 5 JANUARY 2001.
8.
MWD RUNS 1-3 REPRESENT WELL Z-101 WITH API#:
50-029-22978-00.
THIS WELL REACHED A TOTAL DEPTH(TD)OF
9950'MD/6947'TVDSS.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SRAT = SMOOTHED TOOL RUNNING SPEED WHEN NOT DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
SHALLOW
SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
EXTRA
SHALLOW
MEDIUM
DEEP
CURVES WITH AN 'M' SUFFIX DENOTE MAD PASS DATA
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
ROP
RPS
RPX
FET
RPM
RPD
$
.5000
START DEPTH
100.0
108 5
4275 5
4275 5
4275 5
4275 5
4275 5
STOP DEPTH
9921 0
9951 5
9913 5
9913 5
9913 5
9913 5
9913 5
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH
4242.5
4267.5
4272.5
4293.0
4301.0
4347.5
4359.0
4364.0
4376.0
4378.0
4399.5
4405.5
4416.0
4422.5
4430.5
4438.0
4452.0
4454.0
4477.0
4489.0
4494.0
4499.5
4506.5
4509.0
4519.0
4526.0
4531.0
4554.5
4563.0
4586.5
4618.0
4625 0
4634 5
4642 0
4657 5
4664 0
4671 0
4679.5
4682.5
4690.5
4703.5
4713.5
4731.5
4735.0
4739.5
4743.5
4750.5
4756.0
4762.5
4774.0
4782.0
4792.0
4800.5
4805.0
4808.5
4831.0
4833.0
4836.0
4838.5
4864.5
4867.5
4900.0
4906.0
4933.5
4941.0
4954.5
4966.5
4978.0
4982.0
4984.5
5001.5
5010.5
GR
4242 5
4266 5
4272 0
4293 0
4303 0
4350 5
4361 5
4365 5
4377 0
4378 5
4400 5
4407 5
4416 5
4422 5
4432 5
4439 0
4452 5
4456 0
4477 0
4488 5
4495 5
4499 5
4507 5
4509 5
4520 0
4526 5
4532 5
4555 0
4566 0
4589 0
4620 0
4626 0
4635 0
4643 5
4658 5
4665 0
4673 5
4680 5
4684 0
4690 0
4703 0
4714 5
4733 0
4736 5
4740 5
4743 5
4751 0
4757 0
4764 5
4775 5
4783 0
4792 0
4800 5
4804 5
4809 0
4831 0
4833 0
4836 0
4840 5
4869 5
4874 0
4902 5
4906 5
4931 5
4940 0
4956 5
4968 0
4979 0
4981 5
4986 0
5001 5
5011 0
5022 0
5026 5
5034 5
5039 5
5044 5
5048 5
5055 5
5063 0
5067 5
5072.0
5084.5
5091.5
5112.5
5121 0
5140 0
5142 0
5154 0
5165 5
5168 0
5184 0
5202 5
5220 0
5229 5
5258 5
5264 0
5271 0
5288 0
5302 0
5312 0
5314 5
5335 5
5346.5
5360 0
5379 0
5383 0
5402 5
5440 0
5455 0
5460 5
5467 0
5468 5
5485 5
5600 0
5622 5
5632 0
5651 5
5664 0
5693 0
5698 0
5712 0
5715 5
5747 5
5759 0
5762 5
5772 0
5785 5
5799 0
5801 5
5832 0
5890 0
5924 0
5943 0
5949 0
5955 5
5961.0
5968.5
5977.5
6000.5
6024.5
6032 0
6044 5
6053 5
6055 5
6063 5
6073 0
6101 5
5022.0
5028.0
5036 0
5041 0
5044 0
5047 5
5052 5
5063 0
5067 0
5071 5
5082 0
5091 5
5113 5
5121 0
5141 0
5142 0
5154 5
5165.0
5168.0
5182.5
5202.0
5221.5
5229 5
5258 0
5263 5
5270 5
5286 0
5301 5
5312 5
5315 5
5336 0
5347 0
5358 5
5378 5
5382 5
5402 0
5437 0
5454 0
5457 5
5465.5
5467.5
5485.0
5600.0
5623.5
5632.5
5652.5
5665.5
5689.0
5694 5
5708 5
5713 5
5746 0
5757 5
5761 0
5772 0
5785 5
5799 0
5802 5
5832 5
5888 0
5921 5
5941 5
5947 5
5953 0
5959 0
5966 0
5975 5
5997 5
6022 0
6031 0
6042 5
6051 5
6054 0
6061 5
6070 0
6097 0
6108.0
6112.5
6119.5
6122.0
6130.0
6146.5
6184.0
6200.0
6222.5
6238.5
6250.0
6265.0
6272.0
6284.5
6292.0
6319.0
6350.0
6376 5
6398 5
6418 0
6421 0
6431 0
6461 0
6471 0
6502 5
6510 5
6516 5
6526 5
6543 0
6553 0
6561 5
6568 0
6589.0
6603.5
6606.5
6617.0
6626.5
6633.0
6646.5
6658.0
6672 0
6678 5
6686 0
6690 0
6721 5
6729 0
6744 0
6755 5
6786 5
6809 5
6818 5
6851 5
6873 0
6887 5
6905 0
6917 5
6927 5
6932 5
6947 0
6961 0
6963 0
6997 5
7004 5
7008 0
7029 5
7064 0
708O 0
7104 0
7127 0
7147 5
7162 0
7164 0
7180 0
7197 0
7219.5
7230.5
6104 0
6109 0
6116 0
6118 0
6129 0
6144 5
6180 0
6197 5
6219 5
6239 0
6252 0
6265 0
6272 0
6282.5
6291.0
6317.0
6349.5
6378.0
6397.5
6416.5
6420.5
6430.5
6461 5
6471 5
6502 0
6510 5
6515 0
6524 0
6541 0
6550 0
6557 5
6564 5
6585 0
6599 5
6603 5
6618 0
6627 0
6634 5
6645 5
6657 0
6670 5
6678 0
6686.0
6690.0
6723.0
6731.0
6746.5
6755.0
6789.0
6810.5
6821.5
6854.0
6873.5
6889.5
6908.0
6919.0
6930.0
6933 5
6948 0
6962 0
6963 5
6999 0
7005 5
7009 5
7030 0
7064 5
7080 0
7105 5
7128 5
7149 0
7162 0
7164 5
7180 0
7198 0
7218 0
7229 0
7274.5
7287.0
7305.0
7324 5
7365 5
7451 0
7478 5
7492 0
7533 5
7549 0
7556 5
7577 5
7582 5
7597 0
7649 5
7659 5
7678 5
7685 5
7694 5
7735 0
7776 5
78O0 5
7803 0
7807 0
7830 5
7863. 5
7871.0
7893.5
7927.5
7931.0
7940.0
8028.5
8038.0
8075.5
8092.0
8141.5
8158.0
8168.5
8204.5
8217.0
8230.0
8237.5
8245.0
8274.0
8281.0
8300.0
8312.0
8356.0
8363.0
8385.0
8403.5
8412.0
8430.5
8445.0
8449.0
8450.5
8479.5
8492.5
8502.0
8511.5
8538.0
8548.5
8557.0
8581.0
8595.5
8599.0
8607.0
8618.5
8624.0
8631.5
8641.5
8659.0
8670.0
8683.0
8694.5
8721.5
7273
7287
7305
7323
7365
7451
7477
7491
7531
7548
7555
7576
7582
7596
7649
7660
7680
7686
7693
7735
7774
7799
7803
7805
7828
7862
7869
7892
7926
7930
7939
8027
8036
8072
8087
8139
8154
8164
8201
8213
8225
8234
8240
8270
8277
8297
8312
8353
8360
8383
8402
8412
8429
8443
8446
8448
8478
8491
8501
8511
8536
8546
8555
8581
8595
8598
8606
8617
8622
8629
8641
8658
8669
8681
8693
8719
.5
.0
.0
.0
.0
.0
.0
.5
.5
.0
.5
.5
.0
.5
.0
.5
.0
0
0
0
0
0
0
5
5
0
5
0
0
5
0
5
0
0
5
0
0
5
0
5
5
0
0
5
0
5
5
0
0
0
5
5
5
0
5
5
0
5
0
0
5
0
5
5
5
5
5
5
5
5
5
0
0
5
5
5
8738
8748
8758
8781
8800
8806
8827
8855
8870
8876
8887
8889
8895
8924
8934
8947
8956
9006
9032
9038
9057
9061
9091
9118
9149
9165
9169
9191
9197
9207
9253
9267
9271
9276
9287
9291
9303
9312
9316
9322
9332
9338
9348
9377
9394
9400
9402
9405
9416
9430
9448
9466
9474
9488
9513
9528
9536
9540
9543
9555
9582
9592
9600
9605
9609
9638
9649
9655
9676
9694
9801
9838
9864
9921
$
.0
.5
.5
.0
.5
.0
.0
.0
.5
.5
.0
.0
.0
.5
.0
.5
.5
.5
.0
.5
.5
.5
.0
,5
.0
.0
,5
.0
.5
.5
.0
.0
.0
.0
.5
.5
.5
.0
.0
.5
.0
.5
.5
.0
.0
.0
.0
.0
.0
.0
.0
.5
.5
.5
.5
.5
5
0
5
5
5
5
0
0
5
0
0
0
5
0
0
0
0
0
8735
8745
8756
8779
8797
8802
8823
8855
8869
8875
8884
8887
8893
8922
8931
8945
8956
9003
9029
9037
9056
9060
9089
9116
9147
9162
9166
9187
9194
9204
9249
9263
9267
9272
9283
9287
9299
9308
9312
9319
9328
9336
9345
9373
9389
9395
9398
9401
9413
9427
9443
9461
9469
9488
9512
9527
9534
9536
9542
9553
9580
9590
9599
9605
9609
9638
9649
9655
9676
9694
9801
9837
9863
9919
5
5
0
0
0
5
5
0
5
0
5
5
0
0
5
0
5
5
5
0
5
0
0
0
5
0
5
5
5
5
5
5
0
0
0
0
0
5
5
5
0
0
5
5
5
5
0
5
0
5
5
5
5
5
5
5
5
5
0
5
.5
.5
.5
.0
.5
.0
.0
.0
.5
.5
.0
.5
.0
.5
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
REMARKS:
BIT RUN NO MERGE TOP MERGE BASE
1 100.0 4313.5
2 4313.5 9537.0
3 9537.0 9950.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order
DEPT FT 4 1 68
ROP MWD FT/H 4 1 68
GR MWD API 4 1 68
RPX MWD OHMM 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHMM 4 1 68
FET MWD HOUR 4 1 68
Units Size Nsam Rep Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Service Unit Min Max
DEPT FT 100 9951.5
ROP MWD FT/H 0 3901.92
GR MWD API 12.76 430.8
RPX MWD OHMM 0.6 2000
RPS MWD OHMM 0.13 27.54
RPM MWD OHMM 0.82 2000
RPD MWD OHMM 0.17 2000
FET MWD HOUR 0.157167 187.126
First Reading For Entire File .......... 100
Last Reading For Entire File ........... 9951.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Mean Nsam
5025.75 19704
118.347 19687
89.2482 19643
4.45332 11277
4.73022 11277
5.42611 11277
8.53805 11277
4.65969 11277
First
Reading
100
108.5
100
4275.5
4275.5
4275.5
4275.5
4275.5
Last
Reading
9951.5
9951.5
9921
9913.5
9913.5
9913.5
9913.5
9913.5
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MAD
Depth shifted and clipped curves; all MAD runs merged using earliest passes.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
RPS 9397 5
FET 9397 5
RPM 9397 5
RPX 9397 5
RPD 9397 5
GR 9404 0
RAT 9435 0
$
MERGED DATA SOURCE
PBU TOOL CODE MAD RUN NO. MAD PASS NO.
MWD 3 1
$
REMARKS: MERGED MAD PASS.
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
STOP DEPTH
9655 5
9655 5
9655 5
9655 5
9655 5
9655 5
9655 5
MERGE TOP MERGE BASE
9393.0 9655.5
Name Service Order
Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MAD FT/H 4 1 68 4 2
GR MAD A?I 4 1 68 8 3
RPX MAD OHMM 4 1 68 12 4
RPS MAD OHMM 4 1 68 16 5
RPM MAD OHMM 4 1 68 20 6
RPD MAD OHMM 4 1 68 24 7
FET MAD HOUR 4 1 68 28 8
Name Service Unit Min Max
DEPT FT 9397.5 9655.5
RAT MAD FT/H 12.8 751.79
GR MAD API 56.54 280.42
RPX MAD OHMM 0.6 25.62
RPS MAD OHMM 0.91 27.54
RPM MAD OHMM 1.11 27.9
RPD MAD OHMM 1.26 22.49
FET MAD HOUR 34.1403 189.566
First Reading For Entire File .......... 9397.5
Last Reading For Entire File ........... 9655.5
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Mean
9526.5
167.295
127.522
3.87652
4.35344
4.66133
4.81188
145.89
Nsam
517
442
504
517
517
517
517
517
First
Reading
9397.5
9435
9404
9397.5
9397.5
9397.5
9397.5
9397.5
Last
Reading
9655.5
9655.5
9655.5
9655.5
9655.5
9655.5
9655.5
9655.5
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 100.0 4259.0
ROP 108.5 4313.5
$
LOG HEADER DATA
DATE LOGGED: 19-DEC-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 5.46
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 4314.0
TOP LOG INTERVAL (FT): 100.0
BOTTOM LOG INTERVAL (FT): 4314.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: .0
MAXIMUM ANGLE: 59.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PB01770CG8
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 12.250
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE: SPUD
MUD DENSITY (LB/G): 10.20
MUD VISCOSITY S): 180.0
MUD PH: 9.5
MUD CHLORIDES PPM): 300
FLUID LOSS (C3 : 8.0
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000 .0
MUD AT MAX CIRCULATING TERMPERATURE: .000 90.5
MUD FILTRATE AT MT: .000 .0
MUD CAKE AT MT: .000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 100 4313.5 2206.75 8428
ROP MWD010 FT/H 0 2361.42 116.278 8411
GR MWD010 API 12.76 123.21 69.7719 8319
First Reading For Entire File .......... 100
Last Reading For Entire File ........... 4313.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
First
Reading
100
108.5
100
Last
Reading
4313.5
4313.5
4259
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 4259.5 9506.0
RPX 4275 0 9498.5
RPS 4275 0 9498.5
RPM 4275 0 9498.5
RPD 4275 0 9498.5
FET 4275 0 9498.5
ROP 4314 0 9537.0
$
LOG HEADER DATA
DATE LOGGED: 27-DEC-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 65.41
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 9537.0
TOP LOG INTERVAL (FT): 4314.0
BOTTOM LOG INTERVAL (FT) : 9537.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 31.5
MAXIMUM ANGLE: 60.1
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PBO1757HWRG6
EWR4 ELECTROMAG. RESIS. 4 PBO1757HWRG6
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
8.500
BOREHOLE CONDITIONS
MUD TYPE: 4% KCL
MUD DENSITY (LB/G): 10.20
MUD VISCOSITY (S): 50.0
MUD PH: 8.5
MUD CHLORIDES (PPM): 20000
FLUID LOSS (C3): 6.0
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .300
MUD AT MAX CIRCULATING TERMPERATURE: .153
MUD FILTRATE AT MT: .330
MUD CAKE AT MT: .320
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Units Size Nsam Rep Code Offset Channel
Name Service Order
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
DEPT FT 4 1 68
ROP MWD020 FT/H 4 1 68
GR MWD020 API 4 1 68
RPX MWD020 OHMM 4 1 68
RPS MWD020 OHMM 4 1 68
RPM MWD020 OHMM 4 1 68
RPD MWD020 OHMM 4 1 68
FET MWD020 HOUR 4 1 68
70.0
143.6
70.0
70.0
Name Service Unit Min Max
DEPT FT 4259.5 9537
ROP MWD020 FT/H 0.53 3901.92
GR MWD020 API 22.31 430.8
RPX MWD020 OHMM 0.75 2000
RPS MWD020 OHMM 0.13 26.25
RPM MWD020 OHMM 0.82 2000
RPD MWD020 OHMM 0.17 2000
FET MWD020 HOUR 0.157167 73.4297
First Reading For Entire File .......... 4259.5
Last Reading For Entire File ........... 9537
First
Mean Nsam Reading
6898.25 10556 4259.5
124.182 10447 4314
103.347 10494 4259.5
4.69322 10448 4275
4.78673 10448 4275
5.7217 10448 4275
9.26077 10448 4275
1.49087 10448 4275
Last
Reading
9537
9537
9506
9498.5
9498.5
9498.5
9498.5
9498.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 9499.0 9912.0
RPD 9499 0 9912.0
RPM 9499 0 9912.0
RPX 9499 0 9912.0
RPS 9499 0 9912.0
GR 9506 5 9919.5
ROP 9537 5 9950.0
$
LOG HEADER DATA
DATE LOGGED: 04-JAN-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 65.41
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 9950.0
TOP LOG INTERVAL (FT): 9537.0
BOTTOM LOG INTERVAL (FT): 9950.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 25.4
MAXIMUM ANGLE: 32.3
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PBO1784HRG6
EWR4 ELECTROMAG. RESIS. 4 PBO1784HRG6
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 8.500
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE: Water Based
MUD DENSITY (LB/G): 10.30
MUD VISCOSITY (S): 76.0
MUD PH: 9.7
MUD CHLORIDES (PPM): 19500
FLUID LOSS (C3) : 3.1
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .260 67.0
MUD AT MAX CIRCULATING TERMPERATURE: .148 123.0
MUD FILTRATE AT MT: .200 67.0
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order
Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD030 FT/H 4 1 68
GR MWD030 API 4 1 68
RPX MWD030 OHMM 4 1 68
RPS MWD030 OHMM 4 1 68
RPM MWD030 OHMM 4 1 68
RPD MWD030 OHMM 4 1 68
FET MWD030 HOUR 4 1 68
.410
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
67.0
Name Service Unit Min Max
DEPT FT 9499 9950
ROP MWD030 FT/H 0.08 167.7
GR MWD030 API 52.08 238.59
RPX MWD030 OHMM 0.6 25.62
RPS MWD030 OHMM 0.91 27.54
RPM MWD030 OHMM 1.11 27.9
RPD MWD030 OHMM 1.26 22.49
FET MWD030 HOUR 0.364 187.126
First Reading For Entire File .......... 9499
Last Reading For Entire File ........... 9950
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Mean
9724.5
67.2461
105.489
3.75044
3.9082
4.00345
4.13845
44.9473
Nsam
903
826
827
827
827
827
827
827
First
Reading
9499
9537.5
9506.5
9499
9499
9499
9499
9499
Last
Reading
9950
9950
9919.5
9912
9912
9912
9912
9912
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MAD
Curves and log header data for each pass of each run in separate files.
DEPTH INCREMENT: .5000
MAD RUN NUMBER: 3
MAD PASS NUMBER: 1
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
RPD 9393 0
RPM 9393 0
RPS 9393 0
FET 9393 0
RPX 9393 0
GR 9400 5
RAT 9432 0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY S):
MUD PH:
MUD CHLORIDES PPM):
FLUID LOSS (C3 :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
STOP DEPTH
9655 5
9655 5
9655 5
9655 5
9655 5
9655 5
9655 5
04-JAN-01
Insite
65.41
Memory
9655.5
9450.0
9655.5
25.4
32.3
TOOL NUMBER
PBO1784HRG6
PBO1784HRG6
8.500
Water Based
10.30
76.0
9.7
19500
3.1
.260 67.0
.148 123.0
.200 67.0
.410 67.0
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order
Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68
RAT MAD031 FT/H 4 1 68
GR MAD031 API 4 1 68
RPX MAD031 OHMM 4 1 68
RPS MAD031 OHMM 4 1 68
RPM MAD031 OHMM 4 1 68
RPD MAD031 OHMM 4 1 68
FET MAD031 HOUR 4 1 68
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Service Unit Min Max
DEPT FT 9393 9655.5
RAT MAD031 FT/H 12.8 751.79
GR MAD031 API 56.54 280.42
RPX MAD031 OHMM 0.6 25.62
RPS MAD031 OHMM 0.91 27.54
RPM MAD031 OHMM 1.11 27.9
RPD MAD031 OHMM 1.26 22.49
FET MAD031 HOUR 34.1403 189.566
First Reading For Entire File .......... 9393
Last Reading For Entire File ........... 9655.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/01/28
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Mean
9524.25
163.721
127.797
3.86331
4.33593
4.64057
4.80287
145.748
First Last
Nsam Reading Reading
526 9393 9655.5
448 9432 9655.5
511 9400.5 9655.5
526 9393 9655.5
526 9393 9655.5
526 9393 9655.5
526 9393 9655.5
526 9393 9655.5
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 02/01/28
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 02/01/28
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File