Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout200-162200 -/&Z by Date: 11/18/2019 3 1 9 9 8 Transmittal Number: 93714 IV 7-Ar X 4M Wr BPXA WELL DATA TRANSMITTAL Enclosed is a disc with the requested core photos and analysis. If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendallkb .com. APLWeIINo Wlyermit Well Nm Core Photos Core Analysis, Description, etc 50029229780000 2001620 PRUDHOE BAY UN BORE Z-101 50029229880000 2001960 PRUDHOE BAY UN AURO S-104 J 50029229950000 2002080 PRUDHOE BAY UNIT Z-39 50029230080000 2010590 PRUDHOE BAY UN BORE V-100 50029231610000 2031030 PRUDHOE BAY UN BORE V-111 J 50029233880000 2080530 PRUDHOE BAY UN ORIN L-205 L -205P81* *Plug -back analysis located in BP archive database. Please sign and email a copy of this transmittal to. GANCPDCAbp365.onmicrosoft com Thank you, Mer .Merion Xendad SIM Specialist $SIM BP Exploration Alaska�900 E. Benson B1vd.lRoom: 716BIAnchorage, AK Subsurface Information Management 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 JAN 3 0 2020 X11 AOGCC I~ J BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 August 14, 2009 ~ ~,:~-, ~,i~; i ~ <:~ ~~~a`~ ;~_~ ~~ ~~~~~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Z-Pad Dear Mr. Maunder, . bp ~~~~~~E~ OCT ~ 5 2009 ~lask~ Qil ~ Gas Cons. Go~nisRian Anchorap~ o~D~ -' l (~~ ~~- `~ ~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. SincereJy, Torin Roschinger BPXA, Well Integrity Coordinator • ~ BP Expioration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date Z-Pad 8/13/2009 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitod sealant date ft bbls ft na al Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009 Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7l2M2009 Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009 Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009 Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009 Z-06 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009 Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009 Z-OSA 1931280 50029217870100 NA 0.2 NA 2.55 7/24/2009 Z-O9A 2081410 50029219670100 NA 0.2 NA 1.70 7/24/2009 Z-10 1891160 50029219860000 NA 1.3 NA 11.10 7/24/2009 Z-11A 2050310 50029220530100 NA 0.2 NA 1.70 7/26/2009 z-~2 1891020 5oo2s21snoooo NA 1.2 NA &.so 7~2s/2oos 2-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009 Z-146 2060990 50029218440200 NA 0.2 NA 1.70 7/26/2009 Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009 Z-16 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009 Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009 Z-18 1890960 50029219710000 NA 02 NA 1.70 7/26/2009 Z-19A 2061050 5002922251ot00 NA 0.2 NA 1.70 7/26/2009 Z-20 1881000 50029218590000 NA 0.2 NA 1.70 7/26/2009 Z-21A 2001010 50029219380100 NA 0.2 NA 1.70 7/23/2009 Z-22B 1960350 50029220370200 NA 0.5 NA 5.10 7/23/2009 Z-23B 2041080 50029219500200 NA 0.3 NA 1.70 ~/23/2009 Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009 Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009 Z-26A 2060790 50029219450100 NA 0.3 NA 3.40 7/23/2009 Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009 Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25l2009 Z-29 1890650 50029219540000 NA 0.2 NA 1.70 7/25/2009 Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009 Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009 Z-326L1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009 Z-33A 1890050 50029218950t00 NA 0.5 NA 3.40 S/8/2009 Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009 Z-38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009 Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009 Z-46A 205203Q 50029232800t00 NA 1.7 NA 13.60 7/26i2009 Z-100 Z-101 Z-102 2031710 2001620 2070500 50029231820000 50029229780000 50029233530000 NA NA NA 5 1 1.5 NA NA NA 45.90 t0.20 15.30 7/23/2009 7/23/2009 7/25/2009 Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2009 Z-108 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009 Z-112 2071720 5002923380000o NA surface NA F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc MICROFILMED 04/01/05 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE Permit to Drill 2001620 MD 9950 ~ TVD DATA SUBMITTAL COMPLIANCE REPORT 4118~2003 Well Name/No. PRUDHOE BAY UN BORE Z-10'I Operator BP EXPLORATION (ALASKA) INC 7029 ----- Completion Dat 4/23/2001 ---' Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-22978-00-00 UIC N REQUIRED INFORMATION Mud Log No Sample N._Qo Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt i ED D Ver LIS Verification Log Log Run Name Scale Media No Interval Start Stop 100 9921 (data taken from Logs Portion of Master Well Data Maint) OH I Dataset CH Received Number Comments Open 2/1/2002 ""10620 Cn See Notes De Density L.Po-m Cement Evaluation Ind Induction/Resistivity So Sonic Ne Neutron Cn See Notes Cn See Notes Directional Survey 4,~Array mp. Neu. Three ~tector Den ~,,"BHCS ~,~C. ement Volume ,.,.4alEX Array 10027 __...Directional Survey 1 2 BS 1 2 BS 1 25 BS 1 25 BS 1 2 BS 1 25 BS 1 25 2/5 2/5 2/5 5 5 2/5 BS 1 FINAL FINAL FINAL FINAL FINAL FINAL FINAL FINAL FINAL 420O 3006 3023 3023 3023 3023 3023 3023 4200 3023 4294 4294 4294 4294 4294 4294 4200 9945 Open 3/23/2001 L"r0027 9410 6~---~5/17/2002 ~1,0837 9369 Case 5/17/2002 9370 Case 5/17/2002 9400 Case 5/17D002 9386 Case 5/17/2002 9369 Case 5/17/2002 9400 C~/~ 5/17/2002 9945 9400 9945 9945 9945 9945 9945 9945 9945 Open 3/2/2001 ~J;~54 Case 5/17/2002 2/22/2001 oh 3/23/2001 oh 3/23/2001 oh 3/23/2001 oh 3/2/2001 oh 3/2/2001 oh 3/2/2001 oh 3/23/2001 ~0'027 2/22/2001 4200-9945 PEX AlT BHC Data HCAL - PEX Caliper Platform Express Triple combo 4200-9945 Platform Express Triple combo Dir Survey Paper Copy 4294-9945 BL, Sepia 4294-9945 BL, Sepia 4294-9945 BL, Sepia 4294-9945 BL, Sepia 4294-9945 BL, Sepia 4294-9945 BL, Sepia 4200-9945 Digital Data Dir Survey Digital Data Permit to Drill MD 9950 C I ED C [ 2001620 DATA SUBMITTAL COMPLIANCE REPORT 4/18/2003 Well Name/No. PRUDHOE BAY UN BORE Z-101 Operator BP EXPLORATION (ALASKA) INC TVD 7029 . Completion Dar 4/23/2001 Completion Statu 1-OIL Current Status 1-OIL ~>I~R Total Porosity 2 FINAL 6220 9820 oh 3/2/2001 C Cn See Notes 9954 ~SSTVD 2/5 ~-"~MR 5 ~,~'P EX Neutron/Density 2/5 ¢--15~1CS 2/5 FINAL 4200 9945 oh FINAL 4294 9945 oh FINAL 4294 9945 oh FINAL 4294 9945 oh FINAL 4294 9945 oh FINAL 4294 9945 oh 1, 109 9950 Open 3/2/2001 ~54 3/2/2001 3/2/2001 3/2/2001 3/2/2001 3/2/2001 7/10/2002 ~,.1,0969 APl No. 50-029-22978-00-00 UIC N 6220-9820 Color Print 4200-9945 Digital Data 4294-9945 BL, Sepia 4294-9945 BL, Sepia 4294-9945 BL, Sepia 4294-9945 BL, Sepia 4294-9945 BL, Sepia Digital Log Images Well Cores/Samples Information: Name Start Interval Stop Dataset Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? ~ N Chips Received? ~"'~i~ N Analysis Y / N R ~.r.~ iv~.d ? Daily History Received? ~/N Formation Tops ~ N Comments: Compliance Reviewed By: Date: CORE LABORATORIES, INC. HO US TON A D VA NCED TECHNOL 0 G Y CENTER Company · B P Exploration (Alaska) Inc. ~.~ Well · Z-101 Field · Borealis Location · Alaska ~ ~ ~,r~ CL File No · Hou-010006 Date · February 14, 2001 Analysts · LonglKoster CMS-300 CONVENTIONAL PLUG ANALYSIS ° m Sample Depth Reservoir Porosity Permeability b(He) Beta Alpha I Grain Number Net Overburden Klinkenberg I Kair Densi~ ft psig % md psi ft(-t) microns I~llcm3 1# 9552.6 15.45 2.765 2V 9553.3 800 2.53 0.001 0.003 164.00 1.03E+16 2.92E+04 3.303 2 9553.4 800 7.86 0.012 0.022 71.70 3.39E+14 1.23E+04 3.147 3 9554.8 800 20.85 0.197 0.260 22.38 3.27E+11 2.00E+02 2.997 4 9555.6 800 25.73 12.416 13.676 5.46 2.23E+09 8.91E+01 3.003 5V 9556.2 800 9.61 0.002 0.005 135.28 2.32E+15 1.44E+04 3.122 5 9556.5 800 18.19 0.157 0.207 22.93 5.47E+11 2.66E+02 3.160 6 9557.3 800 9.33 0.001 0.003 159.51 8.30E+15 2.63E+04 3.120 7 9558.2 800 21.78 50.561 53.864 3.26 3.46E+08 5.63E+01 2.899 8 9559.3 800 15.88 0.007 0.015 100.35 2.30E+14 4.83E+03 3.142 9 9560.6 800 13.23 0.003 O. 006 128.67 1.58E+15 1.20E+04 3.150 9V 9560.8 800 17.40 0.009 0.014 38.32 8.64E+13 2.41E+03 3.140 10 9561.6 800 17.36 0.043 0.069 45.38 1.80E+14 2.34E+04 3.180 11V 9562.3 800 17.53 2.977 3.311 6.57 3.59E+10 3.41E+02 3.152 11 9562.4 800 17.03 0.726 0.910 16.22 1.49E+11 3.38E+02 3.218 12'** 9563.3 3.085 13 9564.9 800 12.62 0.029 0.052 66.07 1.75E+13 1.48E+03 3.128 14V 9565.7 800 11.98 4.363 4.903 7.05 8.19E+10 1.15E+03 3.133 14 9565.7 800 20.88 3.171 3.597 7.84 9.58E+09 9.68E+01 3.150 15 9566.8 800 14.85 1.395 1.596 8.84 1.29E+11 5.68E+02 3.062 16 9567.7 800 13.13 0.057 0.096 50.52 5.84E+12 1.00E+03 3.254 16V 9567.8 800 14.81 0.013 0.025 84.30 1.43E+13 5.26E+02 3.229 17 9568.8 800 17.09 2.795 3.141 7.26 1.38E+10 1.24E+02 3.050 18 9569.7 800 20.31 6.134 6.976 7.67 1.71E+09 3.37E+01 2.988 19 9570.4 800 12.96 0.684 0.802 11.01 3.40E+11 7.35E+02 3.145 20 9571.6 800 9.39 0.005 0.010 109.66 4.50E+14 6.63E+03 3.180 21V 9572.2 800 17.66 0.059 '0.078 24.22 4.20E+12 7.69E+02 3.217 21 9572.6 800 16.59 0.052 0.080 42.01 5.67E+12 9.61E+02 3.221 PRELIMINARY REPORT Page 1 CORE LABORATORIE$, INC. HOUSTON ADVANCED TECHNOLOGY CENTER Company · B P Exploration (Alaska) Inc. Well · Z-101 Field · Borealis Location · Alaska CL File No · Hou-010006 Date · February 14, 2001 Analysts' LonglKoster CMS-300 CONVENTIONAL PLUG ANALYSIS Sample Depth Reservoir Porosity Permeability b(He) Beta Alpha I Grain Number Net Overburden Klinkenberg I Kair Densit', ft psig % md psi ft(-1) microns I~llcm3 ° m 22 9574.3 800 10.27 0.026 0.038 35.48 5.29E+12 4.52E+02 3.157 23 9577.3 800 17.54 46.15 51.56 5.86 1.13E+09 1.68E+02 2.658 24 9578.7 800 9.92 0.011 0.023 88.94 8.91E+13 3.09E+03 3.232 25 9579.8 800 18.79 0.309 0.448 30.29 1.40E+12 1.36E+03 3.052 25V 9579.8 800 20.35 0.973 1.358 24.77 5.14E+10 1.57E+02 2.834 26 9580.4 800 7.28 0.004 0.008 81.16 1.22E+14 1.43E+03 3.188 27 9581.8 800 19.04 0.654 0.929 27.00 1.98E+11 4.06E+02 2.888 28V 9582.7 800 21.21 1.394 1.821 18.73 1.18E+11 5.22E+02 2.872 28 9582.8 800 22.09 1.301 1.718 19.69 8.42E+10 3.47E+02 2.925 29 9583.5 800 7.71 0.033 0.059 62.43 1.39E+13 1.36E+03 3.124 30V 9584.5 800 19.40 0.632 0.884 25.68 2.01E+11 3.98E+02 2.797 30 9584.6 800 22.18 1.645 2.143 18.34 3.40E+10 1.77E+02 2.870 31 9585.3 800 21.68 1.115 1.511 22.06 9.14E+10 3.21E+02 2.830 31V 9585.5 800 20.70 0.811 1.121 24.23 2.35E+11 5.99E+02 2.872 32 9586.3 800 17.96 1.009 1.321 19.33 9.43E+10 2.99E+02 2.885 33 9587.5 800 20.68 1.891 2.440 17.40 4.40E+10 2.64E+02 2.781 33V 9587.7 800 19.40 0.654 0.926 26.70 3.46E+11 7.09E+02 2.729 34 9588.2 800 23.34 7.285 8.695 10.69 1.09E+09 2.54E+01 2.805 35 9589.7 800 18.34 1.139 1.566 23.24 6.60E+10 2.37E+02 2.661 36 9590.5 800 17.08 2.103 2.698 16.86 1.82E+10 1.22E+02 2.690 36V 9590.6 800 17.07 0.531 0.770 29.30 2.63E+11 4.36E+02 2.649 37 9591.2 800 15.30 1.179 1.571 20.51 6.74E+10 2.51E+02 2.626 38 9592.9 800 18.91 1.299 1.737 20.66 6.78E+10 2.78E+02 2.703 39 9593.4 800 18.80 2.059 2.738 19.55 1.89E+10 1.26E+02 2.653 39V 9593.6 800 16.58 0.782 1.054 22.10 9.84E+10 2.41E+02 2.820 40 9594.6 800 17.56 1.421 1.878 19.66 4.58E+10 2.06E+02 2.641 41 9595.6 800 20.56 8.939 10.43 9.14 6.11E+08 1.75E+01 2.644 41V 9595.6 800 22.16 4.303 5.316 13.40 1.46E+09 2.01E+01 2.648 PRELIMINARY REPORT Page 2 CORE LABORATORIES, INC. HOUSTON ADVANCED TECHNOLOGY CENTER Company · B P Exploration (Alaska) Inc. ~._ Well · Z-101 Field · Borealis Location ' Alaska CL File No · Hou-010006 Date · February 14, 2001 Analysts' LonglKoster CMS-300 CONVENTIONAL PLUG ANALYSIS Sample Depth Reservoir Porosity Permeability b(He) Beta Alpha I Grain Number Net Overburden Klinkenberg I Kair Densib. ff psig % md psi fi(-1) microns rtl 42 9596.4 800 21.16 11.82 13.78 8.90 5.61E+08 2.13E+01 2.650 43 9597.4 800 20.94 9.513 11.27 10.03 6.28E+08 1.93E+01 2.654 43V 9597.8 800 20.34 2.314 2.908 15.18 1.66E+10 1.22E+02 2.652 44 9598.2 800 20.80 10.22 11.83 8.52 6.11E+08 2.00E+01 2.657 45 9599.7 800 19.38 2.535 3.204 15.53 2.04E+10 1.64E+02 2.693 45V 9599.7 800 19.54 1.152 1.546 21.06 4.61E+10 1.72E+02 2.662 46 9600.9 800 19.08 0.641 0.908 26.64 2.11E+11 4.24E+02 2.927 47V 9601.1 800 21.33 0.906 1.224 21.99 3.54E+11 1.03E+03 2.942 47 9601.9 800 21.37 0.949 1.290 22.38 9.15E+10 2.81E+02 2.930 48 9602.4 800 20.75 1.742 2.173 14.85 5.72E+10 3.23E+02 2.967 49# 9603.6 22.32 3.060 50 9604.3 800 18.37 0.416 0.604 29.80 3.86E+11 5.20E+02 2.901 50V 9604.5 800 18.07 0.432 0.613 27.47 6.33E+11 8.86E+02 2.843 51 9605.3 800 21.34 4.533 5.492 11.96 8.80E+09 1.29E+02 2.921 52 9606.4 800 18.31 1.039 1.388 20.83 8.24E+10 2.77E+02 2.768 53 9607.5 800 19.50 12.28 13.94 7.18 4.00E+09 1.59E+02 2.792 53V 9607.5 800 19.10 2.244 2.773 13.91 3.58E+10 2.60E+02 2.810 54 9608.8 800 24.57 537.4 543.2 0.48 1.41E+07 2.46E+01 2.638 55V 9609.5 800 25.18 504.1 514.2 0.90 1.84E+07 3.01E+01 2.639 55 9609.7 800 24.45 543.7 549.3 0.47 1.41E+07 2.49E+01 2.641 56 9613.7 800 10.46 1.160 1.266 5.61 8.38E+10 3.15E+02 2.631 57 9614.8 800 11.28 0.324 0.464 28.69 1.63E+12 1.71E+03 2.619 57V 9614.9 800 12.30 0.026 0.047 60.91 2.56E+14 2.18E+04 2.600 58 9615.7 800 13.68 O. 195 0.283 30.77 4.09E+12 2.59E+03 2.622 59# 9616.2 15.09 2.624 59V 9616.2 800 13.71 0.128 0.184 31.66 6.47E+11 2.67E+02 2.617 60# 9620.7 7.85 2.668 61# 9622.6 15.20 2.643 PRELIMINARY REPORT Page 3 ° rtl CORE LABORATORIES, INC. HOUSTON ADVANCED TECHNOLOGY CENTER Company · B P Exploration (Alaska) Inc. Well · Z-101 Field · Borealis Location · Alaska ~E~ ~LZ'~H s~lY]c~s CL File No · Hou-010006 Date · February 14, 2001 Analysts · LonglKoster CMS-300 CONVENTIONAL PLUG ANALYSIS Sample Depth Reservoir Porosity Permeability b(He) Beta Alpha I Grain Number Net Overburden Klinkenberg I Kair Densib. ft psig % md psi fi(-1) microns Iglcm3 62** 9623.7 13.52 < 0.001 2.617 62V 9625.3 800 13.63 0.752 0.874 10.25 4.13E+11 1.01E+03 2.656 63V 9625.3 800 12.09 0.020 0.035 60.11 7.86E+14 5.10E+04 2,623 64 9627.4 800 10.05 0.095 0.145 38.68 1.89E+12 5.78E+02 0.000 65 9628.2 800 15.03 9.877 11.11 6,76 4.63E+09 1.48E+02 0.000 66 9629.5 800 13.67 1.336 1.631 13.46 5.10E+10 2.21E+02 0,000 66V 9629.7 800 11.67 0.009 0.017 69.01 7.93E+14 2.44E+04 2.633 67V 9631.7 800 12.53 0.028 0.048 55.34 5.60E+13 5.15E+03 2,641 67 9631.8 800 13.28 0.940 1.142 13.39 1.35E+11 4.10E+02 2.615 68 9634.5 800 12.96 0.504 0.589 11.01 6.27E+11 1.02E+03 2,662 69* 9638.9 800 16.56 1.379 1.743 16.07 8.37E+10 3.74E+02 2.624 70V 9642.5 800 10.65 0.033 0.043 24.63 1.20E+13 1.27E+03 2,643 70 9642.7 800 11.00 0.075 0.117 41.14 1.14E+11 2.78E+01 2,630 71 9647.9 800 14.93 41.67 44.70 3.63 7.68E+08 1.04E+02 2.643 72V 9648.1 800 12.68 0.085 0.133 41.79 4.47E+12 1.22E+03 2.644 72 9648.4 800 13.40 0.516 0.685 21.15 3.67E+11 6.13E+02 2.650 73 9650.3 800 13.63 0.571 0.751 20.31 7.61E+11 1.41E+03 2.640 74 9652.1 800 14.01 1.920 2.276 11.06 4.57E+10 2.84E+02 2,643 * Fracture(s) Visible in Sample. ** Sample Permeability < 0.001. Ambient Porosity Reported. *** Sample Failed During Analysis. #Sample Unsuitable For Permeability Measurement. Ambient Porosity Reported. PRELIMINARY REPORT Page 4 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate _ Long Term Shut-In Pull tubing _ Alter casing _ Repair well _ Other _X 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~le, AK 99519-6612 5. Type of Well: Development _X Exploratory__ Stratigraphic_ Service__ 4. Location of well at surface 721' FNL, 3013' FEL, Sec. 19, T11N, R12E, UM At top of productive interval 801' FNL, 1467' FEL, Sec. 13, T11N, R11E, UM At effective depth 691' FNL, 1558' FEL, Sec. 13, T11N, R11E, UM At total depth 652' FNL, 1589' FEL, Sec. 13, T11 N, R11 E, UM (asp's 599659, 5959360) (asp's 596186, 5964516) (asp°s 596094, 5964625) (asp's 596062, 5964663) 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2616' Production 9465' 9950 feet Plugs (measured) 7029 feet 9836 feet Junk (measured) 6926 feet 6. Datum elevation (DF or KB feet) RKB 82 ' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-101 9. Permit number / approval number 200-162 / 302-161 10. APl number 50-029-22978-00 11. Field / Pool u~~ ~ Prudhoe Bay Field / K . Size Cemented Measured Depth True Vertical Depth 20" 72 cf 137' 137' 13-3/8" 3585 cf 4294' 3109' 9-5/8" 1939 cf 9923' 7004' Perforation depth: Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) measured Open Pelfs 9552'- 9598' RECEIVE0 true vertical Open Pelfs 6681'-6720' NOV 0 6 2002 T 'r~l~ eons. commlg lo 3-1/2" 9.2# L-80 TBG ~ 9387'. 3-1/2" 9.2# L-80 ub~ '""'"'""Anchorage ~7" x 3-1/2" Baker S-3 Packer @ 9387' MD. 3-1/2" HES 'X' Nipple @ 2218'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation Shut-In Subsequent to operation Shut-In OiI-Bbl Representative Daily Avera.qe Production or Iniection Data Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 400 15. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations _ 16. Status of well classification as: Oil~X Gas_ Suspended_ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~ ~~f~~~~ Title: Technical Assistant DeWayne R. Schnorr Date October 22, 200.2 Prepared b~/DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE Z-101 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 08/20/2002 SECURE WELL: HYDRATE / ICE PLUG 08/21/2002 SECURE WELL: HYDRATE / ICE PLUG 08/22/2002 SECURE WELL: TUBING TAIL PLUG 08/23/2002 SECURE WELL: HYDRATE / ICE PLUG 08/24/2002 SECURE WELL: DRIFT/TAG; TUBING TAIL PLUG / LONG TERM SHUT-IN EVENT SUMMARY 08/20/02 PRESSURE UP ON ICE PLUG IN TUBING. 08/21/02 PUMP 150 BBLS. DIESEL. DOWN I.A. @ 180 DEGREES TO THAW ICE PLUG. PUMPED 14 BBLS DIESEL. DOWN FLOWLINE AND 26 BBLS. DIESEL. DOWN TUBING. TO FREEZE PROTECT. O8/22/O2 RAN 2.78" CENTRALIZER. SAT DOWN @ 3890' WLM. RAN 5' x 2.5" PUMP BAILER TO 3974' WLM. SAMPLE OF HYDRATES. LEFT WELL SHUT-IN. NOTIFIED OPERATOR. O8/23/O2 PUMP NEAT METHANOL AND HOT DIESEL DOWN THE TUBING TO CLEAR HYDRATES. (60 BBLS OF DIESEL AND 102 BBLS OF METHANOL.) O8/24/O2 SET 2.81 XX PLUG AT BOTTOM X NIPPLE AT 9420' 660 PSI ON TBG. RAN CHECK SET. GOOD SET. PT PLUG TO 1500 PSI. BLED TBG BACK TO 400 PSI. SET 2.81 XX PLUG AT TOP X NIPPLE AT 2198'. RAN CHECK SET. GOOD. PT PLUG TO 1500 PSI. BLED BACK TO 400 PSI LEFT WELL SHUT IN & TAGGED. NOTIFIED OPER. WELL SHUT-IN FOR THE LONG TERM. FLUIDS PUMPED BBLS 102 NEAT METHANOL 338.6 DIESEL 70 DEAD CRUDE 302 SEA WATER 812.6 TOTAL Page 1 WELL LOG TRANSMITTAL To: State of Alaska July 09, 2002 Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs' Z-101 BOREALIS, AK-MM-00308 Z-101 BOREALIS: Digital Log Images: 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Cemer LR2-1 900 E. Benson iBlvd. Anchorage, Alaska 99508 Date: RECEIVED JUL 1" 2002 Ala~a Oil & Gas Co~s. Commission AnchotBDe 2002 Schlumberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATrN: Beth NO. 2078 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Borealis Well Job # Log Description Date Color Sepia BL CD V-101 22207 PEX AlT BHC 04/25/02 ! V-101 22207 PEX AlT 04/25/02 1 1 V-101 22207 PEX DEN/NEUTRON 04/25/02 1 1 V-101 22207 PEXTRIPLE COMBO 04/25/02 1 1 V-101 22207 PEX TRIPLE COMBO SSTVD 04/25/02 1 1 V-101 22207 BHC 04/25/02 1 1 V-101 22207 CEMENT VOLUME LOG 04/25/02 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: RECEIVED 2002 AlmlmOil&B sCons. Schlumberger DCS 3940 Arctic BIvd Suite 300 Anchorage AK 99503-5789 ATTN: Sherrie Receive~ ~ I ( STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandon_ Suspend_X Operational shutdown _ Re-enter suspended well _ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance _ Perforate _ Other _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 5. Type of Well: Development Exploratory __ Stratigraphic __ Service_ 4. Location of well at surface 721' FNL, 3013' FEL, Sec. 19, T11N, R12E, UM At top of productive interval 801' FNL, 1467' FEL, SEC 13, T11N, R11E, UM At effective depth 691' FNL, 1558' FEL, Sec. 13, T11N, R11E, UM At total depth 652' FNL, 1589' FEL, Sec 13 T11N, R11E, UM (asp's 599659, 5959360) (asp's 596186, 5964516) (asp's 596094, 5964625) (asp's 596062, 5964663) 6. Datum elevation (DF or KB feet) RKB 82.0 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-101 9. Permit number / approval number 200-162 10. APl number 50-029-22978-00 11. Field / Pool Prudhoe Bay Field / Kuparuk River Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2616' Production 9465' 9950 feet Plugs (measured) 7029 feet 9836 feet Junk (measured) 6926 feet Size Cemented Measured Depth True vertical Depth 20" 72 c.f. 137' 137' 13-3/8" 3585 c.f. 4294' 3109' 9-5/8" 1939 c.f. 9923' 7004' Perforation depth: measured Open Perfs 9552'- 9598' true vertical Open Perfs 6681' - 6720' Anchorage Tubing (size, grade, and measured depth 3-1/2" 9.2#, L-80 TBG @ 9387'. 3-1/2" 9.2# Tubing Tail to 9445'. Packers & SSSV (type & measured depth) 7" x 3-1/2" Baker S-3 Packer @ 9387' MD. 3-1/2" HES 'X' Nipple @ 2218'. 13. Attachments Description summary of proposal _X Detailed operations program __ BOP sketch 15. Status of well classification as: 14. Estimated date for commencing operation May 15, 2002 16. If proposal was verbally approved Name of approver Date approved Oil __ X Gas __ Suspended _ Service 17. I hereby certify that the foregoing is true ~d correct to the best of my knowledge. Questions? Call Bruce W. Smith @ 564-5093. Signed I~~ ~ Title: Borealis Development Petroleum Engineer Date May 09, 2002 Bruce W. Smith Prepared by DeWar/ne R. Schnorr 564-5174 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test _ Mechanical Integrity Test _ Approved by order of the Commission Form 10-403 Rev 06/15/88 Location clearance__ /"'/0¢ Subsequent form required 10- Ong~nal S~gned b~ Camm~f Oechsli Taylor Commissioner J Approval no,~,t¢l ~,,- ,J (~ I Date SUBMIT IN TRIPLICATE bp BP Exploration (Alaska) Inc. 900 East Benson Boulevard P. O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 May 09, 2002 Tom Maunder Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Dear Tom: Re: Sundry Notice for Z-101 --- Long Term Suspension. BP Exploration Alaska, Inc.proposes, .,., .1'-'"'-,. ~ ,,-,r,~ ...... su__,pens!e.q-for well Z-101 . Well Z-101 has now completed its tract operations flow period. Information has been gathered and will be evaluated for future utility of this wellbore. Category IOR Step Description S State 1 P State 2 S State 3 O State 4 Shut-in wellbore, Plug in tailpipe Pump diesel to freeze protect Ann/Tub Place plug in nipple (2218 MD) Freeze Protect Tree/Flow line, BPV Last Test: Max. Deviation: ?¢r£s: Min. ID: Last TD tag: Last Downhole Ops: Latest H2S value: Reference Log: BHT & BHP: 2/17/02, 68 BOPD 60.0 @ 6201' mdDeviation at perfs: 32.0 9552-9578 MD Four .... 2.813" at X nipples, see schematic 9836' MD based on tubing casing tally PPRQF 12/23/01 0 PPM 6/12/01 Schlumberger Platform express Jan 5, 2001 147° F & psia @ 3431'@6712 TVDSS The procedure includes the following major steps: S-Line: 1. Slickline, shut-in well, place plug into 3 ½" HES X nipple at 9433 MD. Test set. Pump: 2. RU Hot Oiler, and pump diesel (107 bbl ) to freeze protect the annulus and tubing to 3000 ft MD. Slickline: 3. Place plug into 3 1/2" HES X nipple at 2218 MD. Test set. Other 4. Displace tree with neat MEOH, do not use diluted MEOH, and place BPV into tree profile. Freeze protect flow line from tree. Complete a full grease service of all vanes. Service Well'~lt, .. Close Master Valve, SSV, Wing valve(" 't lateral valve. Arrange for gas lift line to be blinded off at tree. Arrange for isolation of any corrosion chemical service lines to be isolated and purged. Tag Master VaNe xvith laminated sign using xvire tie (not string) with the following information: i. Well Z-101 ii. API 50-029-22978-00 Sec. 19, T1 IN, R12E Operator BP Exploration (Alaska), INC. iii. Borealis Owner Group, Contact Satellite Manager (907)-564-5143, prior to any removal or cannibalization of equipment. iv. Well Long term suspended xx/xx/02 v. Well has plugs installed at 9433 MD, 2218 MD, and BPV in Tree. vi. Well is freeze protected with diesel, both annulus and robing, to 3000 ft. vii. Tree has been serviced, tree freeze protected with Neat MEOH. viii.Flow line freeze protected Please call (Brace Smith 564-5093, hm: 345-2948, cell: 440-8008) if there are any questions. Sincerely, Bruce Smith Greater Prudhoe Bay Aurora Development Engineer TREE= 4-1/16" - 5MCIW I ' WELLHEAD= 11" - 5M FIVE G5I SAFETY NOTES KB. ELEV = 81.8' KOP = 726' MaxAn~lb= 60°~6201' I I--'~ 2218' I---~ 3-1/2"HES'X'NIPPLE, ID=2.813" Datum MD = . Datum TVD= 8800' I GAS LIFT MANDRELS STA IVD 'rVD DEV TYPE VLV LATCH! SIZE ~ Minimum E) = 2.813" @ 2218',,-.-..-- m m 3 5297 3564 59 cA rv~Gi ~ RK 3-1/2" HES'X'NIPPLE J L 2 8130 r~o6 38 cA ~G~DV/ RK 1-1~" 17" MARKER JT W/RA TAG I~ 6746'I --i -- ~ ~EI~OI~IION SUMMA I~FLO~: SWS F~TFOI~M EX~01/05/01 ANGLE AT TO~ PEI~:: Noto: Rofor ~o ~roduetion DB for historical porf data SIZE: SPF INTERVAL Opn/Sqz DA~E 2-1/2" 4 9552- 9598 O 04/23/01 r [ 2-1/2" 6 9684- 9702 O 11/26/01 J NOTE: 7" LINER XO FROM 29#, L-80 NSCC TO 29#, L-80 BTC-M @ 9,753' I 17,'csG,29~,L-a°'BTc'M'D:6.182.' I-t 9923'1 i iL DATE REV BY COMIVENTS DATE REV BY cOrVlVlENTS BOREALIS 01/10/01 PGS As Completed, Nabors 9ES 11/26/01 CWS/KAK ADPERFS WELL: Z-101 01/26/01 SIS-MD RNAL PERrvlT No: 200-162 03/16/01 CH/TP COI~,ECTIONS APl No: 50-029-22978-00 05/09101 RAC/KAK PERFS Sec. 19, Tl11~ R12E 11/17/01 DRS/KK PERF& PEFWIIT# CORRECTIONS BP Exploration (Alaska) SIZE SPF INTERVAL Opn/Sqz DA'rE 2-1/2" 4 9552- 9598 O 04/23/01 2-1/2" 6 9684- 9702 O 11/26/01 WELL LOG TRANSMITTAL To: State of Alaska January 29, 2002 Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7~ Avenue, Suite 100 Anchorage, Alaska RE: MWD Formation Evaluation Logs Z-101, AK-MM-00308 1 LDWG formatted Disc with verification listing. API#: 50-029-22978-00 PLEASE ACKNOWiLEDGE RECEIPT iBY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim GaMn 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Cemer LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: RECEIVED 0 ! Alaska Oil & Oas Cons. Comfnissio~ 01 / 14/02 Scklumberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATrN: Sherrle NO. 1720 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris,Botealis, Midnight Sun Well Job # Log Description Date Color Sepia BL CD W-201 ~0/-~:)5 / LEAK DETECTION LOG 12/17/01 1 1 Z-101 <::~(::)O-/~==,~ J PRODUCTION PROFILE 12/23/01 1 1 E-104 ,~-~ C~/---c~ 0 "~ 21524 USIT 12/11/01 2 .I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnlcal Data Center LR2-1 900 E Benson BIvd0 Anchorage AK 99508-4254 Date Delivered: RECEIVED 2002 Schlumberger DCS 3940 Arctic Blvd Suite 300 . Anchorage AK 99503-5789 AT[N: Sherrie i' STATE OF ALASKA (' ALASKA OIL AND GAS CONSERVATION COMMISSION R£PORT OF SUNDRY Will_l_ OPERATIONS 1. Operations pedormed: Operation shutdown_ Stimulate _ Plugging _ Perorate _X Add Perfs Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 721' FNL, 3013' FEL, Sec. 19, T11N, R12E, UM At top of productive interval 801' FNL, 1467' FEL, Sec. 13, T11N, R11E, UM At effective depth 691' FNL, 1558' FEL, Sec. 13, T11N, R11E, UM At total depth 652' FNL, 1589' FEL, Sec. 13, T11N, R11E, UM 5. Type of Well: Development __X Exploratory__ Stratigraphic__ Service_ (asp's 599659, 5959360) (asp's 596186, 5964516) (asp's 596094, 5964625) (asp's 596062, 5964663) 6. Datum elevation (DF or KB feet) RKB 82 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-101 9. Permit number / approval number 200-162 10. APl number 50-029-22978 11. Field / Pool Prudhoe Bay Field / Kuparuk River Oil Pool 12. Present well condition summary Total depth: measured true vertical 9950 feet Plugs (measured) 7029 feet Effective depth: measured 9836 feet Junk (measured) true vertical 6926 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 72 c.f. 137' 137' Surface 2616' 13-3/8" 3585 c.f. 4294' 3109' Production 9465' 9-5/8" 1939 c.f. 9923' 7004' RECEIVED Perforation depth: measured Open Perfs 9552'- 9598', 9684' - 9702' [1~:~ [~ c~'~ ~ ~.001 ' Gas C0~s C0m~issi0~ true vertical Open Perfs 6681' - 6720', 6793' - 6809' ^laska0~& · A~chor~e Tubing (size, grade, and measured depth) 3-1/2" 9.2#, L-80 TBG @ 9387'. 3-1/2" 9.2# Tubing Tail to 9445'. Packers & SSSV (type & measured depth) 7" x 3-1/2" Baker S-3 Packer @ 9387'. 3-1/2" HES 'X' Nipple @ 2218'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 11/23/2001 Subsequent to operation 12/02/2001 Representative Daily Avera.qe Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Well Shut-In Casing Pressure Tubing Pressure 1466 886 432 GL 286 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil__X Gas_ Suspended m Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~ "~ '~'~~__u-~ Title: Borealis Development Petroleum Engineer Bruce W. Smith Form 10-404 Rev 06/15/88 · Date December 18, 2001 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE Z-101 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 10/27/2oo 1 11/06/2001 11/07/2001 11/20/2001 11/24/2001 11/26/2001 DRILL-POST WORK: HOT OIL IA TO THAW TBG DRILL-POST WORK: THAW HYDRATES / PARAFFIN DRILL-POST WORK: DUMMY GUN DRIFT DRILL-POST WORK: FCO (PRE-ADDPERF) DRILL-POST WORK: HEAT WELL BORE UP DRILL-POST WORK: COMPLETED JEWELRY LOG & PERFORATED EVENT SUMMARY 10/27/01 HOT OIL IA TO THAW TBG, TBG STILL PLUGGED. 640 BBLS OF 190' F CRUDE PUMPED DOWN IA 1 BPM @ 2750 PSI. 11/06/01 MIRU SCHLUM. CTU #8. RIH W/2" DOWN-JET NOZZLE. TAG HYDRATE PLUG @ 3,826'. CLEAN OUT W/60/40 METH TO 4,140' AND BREAK THROUGH. SET DOWN IN STICKY MATERIAL (SUSPECT PARAFFIN) AT -4,700'. CALL FOR HOT OIL UNIT. RI AND HOT OIL TUBING FROM SURFACE TO 9,445' (TUBING TAIL). NO OBSTRUCTIONS. FREEZE PROTECT WELL W/CRUDE AND FLOWLINE W/ 60/40 METH. ***NOTIFY PAD OPERATOR WELL IS TO BE LEFT SI FOR ADDITIONAL WELL WORK.*** 11/07/01 RAN 2.5 X 10' DUMMY GUN W/TEL & TAG EOT @ 9417' SLM (ELMD= 9437' FOR A + 20' CORR) CONT' IN HOLE & TAG TD @ 9642' SLM (9662' CORR). RAN 2" PUMP BAILER W/TEL & TAG EOT @ 9420' SLM (ELMD= 9437' FOR A + 17' CORR) CONT'IN HOLE & TAG TD @ 9649' SLM (9666' CORR). - SAMPLE OF FRAC SAND WELL LEFT SHUT IN 11/20/01 RIH WITH 2.4" JS NOZZLE. TAG FILL AT 9660' CTMD. CLEAN OUT FILL TO 9824' CTM (HARD BOTTOM). CHASE ALL FILL OOH, TURN WELL OVER TO FILTERED NON-SLICK 2% KCL WITH 4000' TVD DIESEL CAP IN PREP FOR UPCOMING PERFS. FP FLOWLINE WITH 60/40 MW. ***LEFT WELL SHUT-IN FOR PERF JOB*** 11/24/01 HEATED WELL BORE UP WITH 340 BARRELS OF 180' CRUDE. LINE GAS LIFT UP TO CYCLE DOWN FLOWLINE. 11/26/01 COMPLETED JEWELRY LOG & PERFORATED 18' INTERVAL (8684' - 9702') WITH 2-1/2" P J, 6 SPF, RANDOM ORIENTATION, 60 DEG PHASED GUN. WARMED IA & TBG WITH HOT CRUDE PRIOR TO SHOOTING. POPPED WELL, PUMPED 5 BBL MEOH PRIOR TO OPENING AL. SET UP TO HAVE MEOH PUMPED FOR 12 HOURS. UNABLE TO HEAT AL LINE DUE TO LACK OF INSULATION ON AL LINE. FLUIDS PUMPED BBLS 1 IPRESSURE TEST LUBRICATOR W/1 BBL OF DIESEL, (1 TESTS) Page I Z-101 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 24 METHANOL 300 60/40 METHANOL WATER 60 2& KCL WATER 477 EXTRA SLICK 2% KCL WATER 45 3# BIOZAN 48 DIESEL 1140 CRUDE 2050 TOTAL ADD PERFS 11/26/2001 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2-1/2" PJ, 6 SPF, RANDOM ORIENTATION, 60 DEG PHASED GUN. 8694'-9702' Page 2 i STATE OF ALASKA (' ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandon_ Suspend_ Operational shutdown _ Re-enter suspended well _ Alter casing_ Repair well _ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance _ Perforate _X Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development_X RKB 82.0 feet 3. Address Exploratory_ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchora~le, AK 99519-6612 Service_ Prudhoe Bay Unit 4. Location of well at surface ~' ,,/' ~' 8. Well number 721' FNL, 3013' FEL, Sec. 19, T11 N, R12E, UM (asp's 599659, 5959360) Z-101 At top of productive interval 9. Permit number / approval number 801' FNL, 1467' FEL, SEC 13, T11 N, R11 E, UM (asp's 596186, 5964516) 200-162 ~' At effective depth 10. APl number 691' FNL, 1558' FEL, Sec. 13, T11 N, R11 E, UM (asp's 596094, 5964625) 50-029-22978 At total depth 11. Field / Pool 652' FNL, 1589' FEL, Sec 13 T11N, R11E, UM (asp's 596062, 5964663) Prudhoe Bay Field/Kuparuk River Oil Pool 12. Present well condition summary Total depth: measured 9950 feet Plugs (measured) true vertical 7029 feet Effective depth: measured 9836 feet Junk (measured) true vertical 6926 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 110' 20" 72 c.f. 137' 137' Surface 2616' 13-3/8" 3585 c.f. 4294' 3109' Production 9465' 9-5/8" 1939 c.f. 9923' 7004' RECEIVED Perforation depth: measured Open Perfs 9552'- 9598' OCT 2 6 ~)001 true vertical Open Perfs 6681' - 6720' ^laska0il & Gas Cons. Commission Anchorage Tubing (size, grade, and measured depth 3-1/2" 9.2#, L-80 TBG @ 9387'. 3-1/2" 9.2# Tubing Tail to 9445'. Packers & SSSV (type & measured depth) 7" x 3-1/2" Baker S-3 Packer @ 9387' MD. 3-1/2" HES 'X' Nipple @ 2218'. 13. Attachments Description summary of proposal __X Detailed operations program __ BOP sketch __ 14. Estimated date for commencing operation 15. Status of well classification as: October 28, 2001 16. If proposal was verbally approved Oil ~ X Gas ~ Suspended _ Name of approver Date approved Service 17. I hereby certify that the foregoing is true end--best of my knowl.edge. Questions? Call Bruce W. Smith @ 564-5093. Signed Title: Borealis Development Petroleum Engineer Date October 26, 20.01 Bruce W. Smith Prepared by DeWa}~ne R. Schnorr 564-5174 FOR COMMISSION USE ONLY --, Conditions of approval: Notify Commission so representative may witness Approval no. Plug integrity_ BOP Test__ Location clearance__ ~)1 '"' ,._,~-~' Mechanical Integrity Test__ Subsequent form required 10- I.~,~, _.. Approved by ..o.r.d.er of the Co..m..mission 0rigirlal Sign.d BY ................... Commissioner Date .... / Cammy 0echsli / / Form 10-403 Rev 06/15/88 · ORIGINAL SUBMIT IN TRIPLICATE bp ( BP Exploration (Alaska) Inc. 900 East Benson Boulevard P. O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 October 26, 2001 Tom Maunder Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Dear Tom: Re: Sundry Notice for Z-101 to Add Perfs (Kuparuk A Sands) BP Exploration Alaska, Inc. proposes to perforate the Kuparuk A Sands to provide additional information to allow recommendations to be made on the future utility of this wellbore. The procedure includes the following major steps: Category IOR Step Description S 200 1 P 200 2 E 200 3 S 200 4 Full bore drift w/dummy gun to PBTD, Pump Heated Dead crude Perforate 18' of A5, lowest shot 9702 MD Static survey Last Test: Max. Deviation: ?¢r£s: Min. ID: Last TD tag: Last Downhole Ops: Latest H2S value: Reference Log: BHT & BHP: June 2001, zero production test 60° @ 6201' mdDeviation at perfs:32° 9552-9578 MD Four .... 2.813'.' at X nipples, see schematic 9836' MD based on tubing casing tally Pull side pocket gauge 6/12/01 0 PPM 6/12/01 Schlumberger Platform express Jan 5, 2001 147° F & psia @ 3431'@6712 TVDSS S-Line: 1. Slickline, full drift using 20-foot dummy perf gun to PBTD. Generic Gas lift is installed. Pump: 2. Pump on annulus using dead crude, heat to its max temp (160-180 degf), limit rate since circulation is through GLV. Displace full annulus and tubing with heated fluid. Perforate xvell, Zone A5 from 9702-9684 MD, (6728-6712 TVDss). Perforate using Schlumberger 2 1/2" HSD PJ, 2506 UP, 6SPF 60 degree phasing, oriented none. Tie- into SWS Platform Express Log Jan 5, 2001. Max swell of 2.75-inch possible. Extra care to leave gun above perfs but below tailpipe after shooting, shutting in well allowing it to stabiliv, e. Once stable, pull gun through tailpipe at steady rate. 4. Flow well to cleanup perforations using warmed (looped) gas lift. Apply neat MEOH to gas lift supply. (Critical, full wellbore must be wanned up prior to flowing well, this well will hydrate off and must be "babied".) 5. Flow Test with maximum rate for +/-24 hours, take separator oil and gas samples for API/WC/BSW/H2S analysis. (1 gal) 6. :Slickline: 1. Wait at least 24 hours for pressure build-up. 2. Obtain static reservoir pressure, run gauges w/two spun down MRT's. 3. Reservoir datum is 6600 TVD. 7. Leave well on production, well to be tested twice a month until permission to produce expires (Tract Operations), Borealis Production Engineer will contact operations on time and date. Please call (Bruce Smith 564-5093, hm: 345-2948, cell: 440-8008) if there are any questions. Sincerely, Bruce W. Smith Greater Prudhoe Bay Borealis Development Engineer Re: Z-101 Add Perfs S~ubjeC{: Re: Z-101 Add Perfs Date: Fri, 26 Oct 2001 15:14:49 -0800 From: Tom Maunder <tom_maunder@admin.state.ak.us> To: "Smith, Bruce W" <SmithBW@BP.com> CC: John D Hartz <jack_hartz@admin.state.ak. us>, Bob Crandall <bob_crandall@admin.state.ak. us> Bruce, As we discussed, I am not fully knowledgeable with regard to tract operations and I am a little gun-shy with that area. However, in this case you will be perforating additional zones in the same formation. I think this is a key distinction from the wells on L pad. There is also a tract agreement in place for this well. Based on those facts, your request to add the A sand perfs is acceptable. Please keep us informed with regard to the activities. Please plan to submit a sundry regarding this request on Monday. Good luck, make oil. Tom Maunder, PE AOGCC "Smith, Bruce W" wrote: BP would like to add additional perforation into the well Z-101, AP1#50-029-22978-00. This well is currently under Tract operations. The original perforations were in the C sands of the Kuparuk formation, these sands were frac'd. Perf depths 9552-9578 These sands were not productive. Between 0 and 30 bbls of total production over 24 hours. Well was shut-in and freeze protected while evaluating future options. BP would like to add additional perfs in the Kuparuk A5 zone. Perf interval of interest are 9702.9684 MD (6728.6712 TVDss. There is no plan at this time to frac this interval. If this zone is not productive, it is planned to shut-in and freeze protect, while we re-evaluate other uses for this wellbore. Bruce W. Smith BP Exploration (Alaska) Western New Developments Engineer PO Box 196612 MS 6-5 Anchorage AK 99519-6612 907-564.5093 Tom Maunder <tom maunder~,admin.state.ak, us> Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 1 of 2 10/30/01 12:53 PM t' STATE OF ALASKA 'Mi" ALASKA U~L AND GAS CONSERVATION COM ~-.JlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised: 06/06/01 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. -,.. ............... ..... 200-162 '~ ~. ':. C..",,'i' [~H~,'~ -3. Address .... ~ 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 ~,";"r;'~ ! 50-029-22978-00 4. Location of well at surface :--:-:..... .. ;.:,..~:'~.!. 9. Unit or Lease Name 722' SNL, 1938' EWE, SEC. 19, T11N, R12E, UM -' ' Prudhoe Bay Unit At top of productive interval :::' ..,~-,'/~.,. '~,,~:~ .................... 4626' NSL, 1589' WEL, SEC. 13, T11 N, R11 E, UM (: Z-101 : 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation'and Sedal No. 11. Field and Pool Prudhoe Bay Field / Kup;ru,~ KBE = 81.80' ADL 028245 _.~1~.~ 12. Date Spudded 113. DateT. D. Reached114. Date Comp., Susp., or Aband. 115. Water depth, ifoffshore 116. No. of Completions l 12/15/2001 1/4/2001 4/23/2001 N/A MSL I One 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD) 9950 7029 FTI 9836 6926 FT [] Yes [] No (Nipple) 2218' 1900, (Approx.) 22. Type Electdc or Other Logs Run MWD, GE, RES, DEN, NEU, CMR, Sonic, RFT, Percussion Sidewall Cores, CCL, Temp, MET 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 109' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 28' 4294' 12-1/4" 689 sx Articset Lite 3, 329 sx 'G' 7" 29# L-80 26' 9923' 8-3/4" 618 sx Class 'G' , , , , 24. Perforations pp. en to. Producti.on (M.D+.TVD of Top and 25. TUBING RECORD Bottom and ~nterval, s~ze an(] numDer} SIZE DEPTH SET (MD) PACKER SET (MD) 2-1/2" Gun Diameter, 4 spf 3-1/2", 9.3#, L-80 9445' 9387' MD TVD MD TVD 9552' - 9578' 6681' - 6703' 9572' - 9598' 6698' - 6720' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9552' - 9598' Hydraulic Fracture with 32,672 lbs behind pipe of 20/40 mesh ceramic proppant Freeze Protected with 100 bbls of Diesel 27. PRODUCTION TEST Date First Production i Method of Operation (Flowing, gas lift, etc.) May 20, 2001 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-aBE GAS-MCF WATER-aBE CHOKE SIZE I GAS-OIL RATIO 5/20/2001 4 TEST PERIOD 34 136 270 176I 4012 Flow Tubing Casing Pressure CALCULATED OIL-aBE GAS-MCF WATER-BBL OIL GRAVITY-APl (CORE) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. See attached.:i'~,!i'?? '.~':.?i::~ '~i ';'~' !~ :''!': .;!ii "!=?' ;,;:: ".~_ ,, .,, ,,!,.,. .. !: ~ ,~ ~,'[ir'"~ I' ]'r" r'l',l- Form 10-407 Rev. 07-01-80 Submit In Duplicate [ )NFI,DENIlN. 29. Geologic Markers 30. Formation Tests · Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Top of Schrader Bluff 6336' 4179' Base of Schrader Bluff 7393' 4895' Top HRZ 9250' 6424' Base HRZ 9454' 6598' Kuparuk D 9540' 6671' Kuparuk C 9554' 6683' Kuparuk B 9609' 6729' Kuparuk A6 9668' 6779' Kuparuk A5 9682' 6791' Kuparuk A4 9706' 6812' Miluveach 9755' 6854' 31. List of Attachments: ' Summary of Post-Rig Work ' , :32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble.,~~.~ ~ Title TechnicalAssistant Date Z- 101 200-162 Prepared By Narne/Nurnbec Terrie Hubble, 564.4628 Well Number Permit No. /Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Inject on~,Shbt- ,~, (~th~r~piain. ITEM 28: If no cores taken, indicate 'none'. . Form 10-407 Rev. 07-01-80 Z-101 { DESCRIPTION OF WORK COMPLETED POST RIG DRILLING OPERATIONS Date Event Summary CONFIDENTIAL 4/19/2001- 4/21/2001: 4/22/2001: 4/23/2001: 5/07/2t}01: 5/09/2001: 5/10/2001,: 5/11/2001: Pulled ball & rod f/RHC Plug @ 9409' SLM. Installed generic GLV design. Tagged PBTD @ 9782' SLM. Underbalanced tubing. Pmnped 50 bbls of MEOH down IA. MIRU ELU. PT'd equip to 3000 psi. RIH w/perf guns & tagged PBTD @ 9820'. Logged well w/GR/CCL/Temp/MRT & POOH. RIH & shot 26' of initial perforations from: 9552' - 9578' MD (Zone Kuparuk 4CB) Ref Log: SWS Platform Express 1/05/2001. Used 2-1/2" carriers & all shots @ 4 SPF, orientated 90° off low side, underbalanced press, & 180° phasing. POOH w/guns - ASF. RD ELU (more perfs to follow at latter date). Loaded IA w/5 bbls MEOH, followed by 147 bbls of Seawater, followed by 51 bbls Diesel. Pumped 13 bbls of Seawater down tubing - tubing locked up. Pumped 1 '17 bbls Diesel down IA for FP. MIRU CTU & PT'd equip. RIH & jetted through ice to PBTD @ 9820' CTM. PUH to 9500'. Performed injection test - 0.2 bpm @ 2150 psi, bled off 350 psi alter 5 min. POOH w/CT. MIRU SLU. Performed GLV work. Completed GLV work. Tagged PBT.D @ 9834' SLM. PT'd IA to 4000 psi - passed. RD SLU. MIRU ELU. PT'd equip. RIH w/perf guns & shot 26' of perforations '1'7: 9572' - 9598' MD (Zone Kuparuk C4B) Used 2-1/2" carriers & all shots @ 4 SPF, orientated 90° off low side, balanced press, & il 80° phasing. POOH w/guns - ASF. RD ELU. MIRU. PT'd equip. Performed a FB Hydraulic Fracture Treatment using 20/40 mesh ceramic proppant through the open perforations from: 9552' - 9598' MD (Kuparuk Zone C4B) Pumped: (a) 1.20 bbls 20# Gelled Pre-Pad @ 25 bpm, followed by shutdown. ISIP = 2128 psi. (b) 50 bbls 40# Crosslinked Gelled Pad @ 25 bpm, followed by (c) 20 bbls I ppg Scour Stage @ 25 bpm, followed by (d) 130 bbls Flush @ 25 bpm, followed by (e) Shutdown. ISIP = 2050 psi. Resumed pumping Datafrac Treatment: (1') 45 bbls 40# Crosslinked Gel @ 25 bpm, followed by (g) 93 bbls 20# Linear Gel Flush @ 25 bpm, followed by (h) Shutdown. ISIP = 2328 psi. Page 1 Z-101 DESCRIPTION OF WORK COMPLETED POST RIG DRILLING OPERATIONS Date Event Summary 5/12/2001: 5/13/2001: 5/14/2001: 5/17/2001: 5/18/2001: 5/20/2001: 5/23/2001: OI IDENTIAL Resumed pumpin~ Frac Treatment: (i) 55 bbls 40g Crosslinked Pad @ 25 bpm, followed by (j) 191 bbls Crosslinked Slurry @ 25 bpm w/proppant stages @ 1-10 ppg, followed by (k) 81 bbls Flush @ 25 bpm, followed by (1) Shutdown. ISIP = 2224 psi Underdisplaced by 5 bbls leaving 855 lbs in wellbore. Placed a total of 32672 lbs of proppant behind pipe. Max proppant concentration placed was 8 ppg. FP'd well. RD. MIRU SLU. RIH & tagged fill @ 9667' SLM. Ran new GLV design. Completed new GLV design installation. RD SLU. Warmed IA w/hot Diesel. Attempted to thaw ice plug in tubing. MIRU CTU & APC Sepm'ator. PT'd equip. RIH w/CT & jetted hydrates w/hot Crude f/1850' to 5350' CTM. Pumped 100 bbls Hot Diesel down IA. APC Separator flowing back. RD CTU. Performed 4 hr production test: Oil = 36 bpd, Water = 270 bpd, FG = 122 MSCFD, FM GOR = 3389, FTP = 260 psia. Sampled well. Page 2 ALASKA OIL AND GAS CONSERVA~ION CO~SSION TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 May 17, 2001 Gordon Pospisil Team Leader, GPB West End Development BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Subject: PBU Tract Operation, ADL 028245 Z-101, Kuparuk Formation Dear Mr. Pospisih The Commission received your letter dated February 21, 2001, requesting permission to commingle undefined pool production from the Kuparuk formation with fluids from the Prudhoe Pool IPA. Your request is for surface commingling only and states there will be no downhole commingling of formation fluids from the formations comprising the Prudhoe Pool. Commingling will take place as the produced fluids from Z-101 are transported to PBU gathering facilities. In addition to commingling, you have requested a waiver from the gas-oil ratio limitations of 20 AAC 25.240 for the duration of the evaluation, up to one year. The Commission approves your request for surface commingling contingent on the following conditions for a period of up to one year or as limited by the Division of Oil and Gas Tract Operation permit. Production from Z-101should be reported separately to the Prudhoe Bay Field, Kuparuk River Pool, pool number 640140, for those months the well is tested. Allocation procedures agreed with the Division of Oil and Gas will suffice for production reporting during the evaluation period. At least two well tests per month are required for commingled production allocation. , Our understanding is that BPX will be gathering fluid samples for PVT analysis, conduct pressure tests and monitor GOR performance as part of the surveillance activity for this project. We are interested in the PVT properties and pressure performance and would appreciate a review of the results when the evaluation is complete or as the data is gathered. We look forward to hearing results of this test. If there any questions, contact Jack Hartz at 279~ 1433 ext. 232. Sincerely, Alaska Oil & Gas Conservation Commission Copy: Mark Myers, DNR/DOG Dan Dickinson, DOR Z101-PbuKRPoolTractCommingle,doc 3/21/01 Schlumberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATrN: Sherrie NO. 1097 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Borealis Well Job # Log Description Date Color Sepia BL CD [-101 21039 PEX,AIT, BHC,CMR,RFT, NGT,DEQ 010501 1 -101 21039 PEX-AIT 010501 1 1 Z-101 21039 IBHC 010501 1 1 Z-101 21039 PEX-CNL3 DET DENSITY 010501 1 1 *Note- This is the REDO PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc, Petrotectnical Data Center LR2-1 900 E Benson Bivd, Anchorage AK 99508-4254 RECEIVED HAR 2 3 2001 Date Delivered: Alaska Oil & Gas Coos. Commiss~ Schlumberger DCS 3940 Arctic BIvd Suite 300 Anchorage AK 99503-5789 A1ZN: Sherrie Schlumberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 AI'rN: Sherrie NO. 999 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 2/21/01 Field: Borealis Well Job # Log Description Date Color Sepia BL CD P~'-101 21060 CMR PROCESSING 011001 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 RECEIVED Date Delivered: Ai~ska Oil & Gas Cons. Commissio~ Schlumberger DCS 3940 Arctic Blvd Suite 300 Anchorage AK 99503-5789 AlffN: Sherrie Received~ ~ Schh berger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 All'N: Sherrie NO. 1025 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 2/27/01 Field: Borealis Well Job # Log Description Date Color Sepia BL CD Z-101 21039 PEX,AIT,BHC,CMR,RFT, NGT,DEQ 010501 1 Z-101 21039 PEX-AIT 010501 1 1 Z-101 21039 BHC 010501 I 1 Z-101 21039 PEX-CNL3 DET DENSITY 010501 1 1 Z-101 21039 CEMENT HOLE VOLUME 010501 1 1 Z-101 21039 PEX-SSTVD 010501 1 1 Z-101 21039 NGT 011001 1 1 Z-101 21039 CMR 011001 1 1 Z-101 21039 RFT 011001 1 I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 RECEIVED Date Delivered: MAR 2 2001 Alaska 0il & Gas Cons. Commissi~ Artchora!~e Schlumberger DCS 3940 Arctic BIvd Suite 300 Anchorage AK 99503-5789 Al-TN: Sherrie Received Schhunberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-$711 ATI'N: Sherrie NO. 1025 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 2/27/01 Field: Borealis Well Job # Log Description Date Color Sepia BL CD Z-101 21039 PEX,AIT, BHC,CMR,RFT, NGT, DEQ 010501 1 Z-101 21039 PEX-AIT 010501 1 1 Z-101 21039 BHC 010501 1 1 Z-101 21039 PEX-CNL3 DET DENSITY 010501 1 1 Z-101 21039 CEMENT HOLE VOLUME 010501 1 1 7'-101 21039 PEX-SSTVD 010501 1 1 Z-101 21039 NGT 011001 1 1 Z-101 21039 CMR 011001 1 1 Z-101 21039 RFT 011001 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 RECEIVED Date Delivered: MAR 2 2001 Naska 0il-& Gas Cons, Comm~lor, Anchoraoe Schlumberger DCS 3940 Arctic BIvd Suite 300 Anchorage AK 99503-5789 A1ZN: Sherrie ..... STATE OF ALASKA ALASKA(',.,,L AND GAS CONSERVATION COMM(,..,~ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,, 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Nar~e of Operator 7. Permit Number ' BP Exploration (Alaska) Inc. 200-162 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22978-00 , 4. Location of well at surface 9. Unit or Lease Name 722' SNL, 1938' EWL, SEC. 19, T11N, R12E, UM Prudhoe Bay Unit At top of productive interval 4478' NSL, 1467' WEL, SEC. 13, T11N, R11E, UM At total depth 10. Well Number 4626' NSL, 1589' WEL, SEC. 13, T11N, R11E, UM Z-101 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool Prudhoe Bay Field / lO--Pool KBE =81.80' ADL 028245 12. Date Spudded 12/15/2001 113' Date T'D' Reached 114' Date cOmp'' Susp'' Or Aband' 1/4/2001 } 15. Water depth, if offshore N/A MS L I116' N°' °f C°mpleti°ns One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost 9950 7029 ETI 9836 6926 FTI [] Yes [] NoI (Nipple) 2218' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, DEN, NEU, CMR, Sonic, RFT, Percussion Sidewall Cores , ,, 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP . BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 109' 30,, 260 sx Arctic Set (Approx.) " 9-5/8" 40# L-80 28' 4294' 12-1/4" S89 sx Articset Lite 3, 329 sx 'G' ....... 7,, 29# L-80 26' 9923' ' 8.3/4,, 318 sx Class"G' ... 241 Perforations open t'o' ~roductior~' ('aD+T'VD"0f T0p'~nd' ' ' ~'5'. ............... TuBiNG' REcoRD ................ Bottom and interval, size and number) ..... SIZE DEPTH SET (MD) PAcK'i=R' sE:'r '(MD) None ' 3:i/2", 9.3#,'L'-"80 ........... 9'445'~ ..... 9387' ' ' MD TVD MD TVD .......... 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 65 Bbls of Diesel , 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production Pending Tract Operation Approval: To Tie-In, Perforate and Produce Date of Test Hours Tested PRODUCTION FOR OIL'BBL GAS'MCF WATER-BBL CHOKE SIZE ] GAS-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS'MCF WATER'BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. ' " CORE DATA ' " Brief description of lithology, Porosity, fractures, apparent dips and presence of oil, gas or water. 'Submit core chips. "" See attached. RECEIVED MAR 0 1 2001 Alaska Oil & Gas Cons. Commission Anch,o, rage Form 10-407 Rev. 07-01-80 ORIGINAL Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Top of Schrader Bluff 6336' 4179' Base of Schrader Bluff 7393' 4895' Top HRZ 9250' 6424' Base HRZ 9454' 6598' Kuparuk D 9540' 6671' Kuparuk C 9554' 6683' Kuparuk B 9609' 6729' Kuparuk A6 9668' 6779' Kuparuk A5 9682' 6791' RECEIVED Kuparuk A4 9706' 6812' Uiluveach 9755' 6854' J~'/~ ~ Alaska Oil & Gas Cons. Commission Anchorage 31. List of/i, ttacl~m'ents: Summary of Daily Drilling R~ports, Core Description', Surveys'(submi{ied 'by vendori .................................. 32. i hereby certify that the foregoing is true and correct to the best of my knowl"edge Signed Terrie Hubble ~""~ ~ Title Technical Assistant Date Z- 101 200-162 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. ~NSTRUCTIONS GENERAL.' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 BPX Exploration, Alaska Z-101 Well Core Description Prudhoe Bay Field Core #1: cut 40'(9537'-9577'), recovered 37.4'. Inclination of well bore was 32 degrees from vertical. 9537'-9552': Shale, medium to dark gray, fissile, becomes glauconitic and pyritic in the lower part (below 9545'). 9552'-9556': Sandstone, light to dark gray, slightly to very glauconitic, dominantly very fine grained, poorly sorted, abundant silica and siderite cement, low porosity, scattered oil stain and fluorescence. 9556-9568': Sandstone, dark gray, slightly glauconitic, common carbonaceous material, dominantly medium grained, poorly sorted, abundant silica and siderite cement, little or no porosity and permeability, no fluorescence or oil stain. Silt content increases downward. Interval includes a few fractures, which were bleeding oil. 9568'-9574.4': Sandstone, dark greenish gray, very glauconitic (30%), very fine to very coarse grained, poorly sorted, abundant silica and siderite cement, low porosity and permeability, spotty brown oil stain and fluorescence. Core #2: cut 22' (9577'-9599'), recovered 22'. Inclination of well bore was 32 degrees from vertical. 9577-9582': light to medium grayish, greenish brown, slightly to moderately glauconitic, coarse grained, decreasing downward to medium grained, moderately well sorted, cOmmon silica and siderite cement, poor to fair porosity, poor permeability, scattered brown oil stain and fluorescence. Leached shell fossils at 9581.5. 9582-9599': medium grayish brown, mostly moderately glauconitic (5-30%), becoming less glauconitic downward, very fine to medium grained, moderately sorted, poor to fair porosity, low permeability, brown oil stain and fluorescence; nearly uniform, slightly spotty and scattered oil stain and fluorescence. Core #3: 9599'-9637' (cut 38', recovered 34'). Inclination of well bore was 32 degrees from vertical. 9599'-9610': light to med grayish brown to brown, slightly to very glauconitic (5-30%, mean 15%), medium grained, moderately sorted, mostly low porosity and permeability, with good to excellent porosity and permeability in lowest 1-2 feet, even to mottled oil stain and fluorescence (excellent stain and fluorescence in basal 1-2'). RECEIVED Alaska Oil & Gas Cons. Commission Anchorage 9610-9633: thin layers of very dark brownish gray shale, hard, fissile, and slightly micaceous, alternating with thin layers of medium brown sandy siltstone, fair porosity, probable low permeability, ripple to planar laminated, uniform brown oil stain with uniform fluorescence. Very similar throughout interval. Open slickensided fracture at 9610-9612', with oil in fracture. Core #4: 9637'-9657.5'. Cut 20.5', recovered 20.5'. Well bore inclination 32 degrees from vertical. 9637'-9757.5': thin layers of very dark brownish gray shale, hard, fissile, and slightly micaceous, alternating with thin layers of medium brown sandy siltstone, fair porosity, probable low permeability, ripple to planar laminated, uniform brown oil stain with uniform fluorescence. Very similar throughout interval. RECEIVED MAR 0 I 2001 Alaska Oil & Gas Cons. Commission Anchorage Legal Name: Z-101 Common Name: Z-101 ;: ::;: ;;:SUrfaCe PressUre Leak Off Pressure (BHP) EMW 12/21/2000 FIT 4,294.0 (ft) 3,109.0 (ft) 9.00 (ppg) 566 (psi) 2,020 (psi) 12.50 (ppg) -' ~ g Printed: 2/1512001 3:23:44 PM · (' ( RECEIVED BP EXPLORATION MAR 0 1 Z001Page 1 of 9 Operations Summary ReportAlaska0il & Gas Cons. Commission Anchorage Legal Well Name: Z-101 Common Well Name: Z-101 Spud Date: 12/15/2000 Event Name: DRILL+COMPLETE Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 7ES Rig Number: Sub Date From-To Hours Task Code Phase Description of Operations 12/14/2000 05:00 - 16:00 11.00 RIGU PRE Rigged down from Z-21A. Made derrick up move, well to well in same row with 90 stands drill pipe in derrick. Rigged up. Had previously installed drilling spool on 20" conductor and nippled up 21 1/4" diverter spool and annular preventer. 16:00 - 00:00 8.00 BOPSUR :SURF Took water into pits. Filled pits with spud mud. Began installing 20" riser on diverter. Loaded HWDP and 8" directional tools into pipe shed. 12/15/2000 00:00 - 05:30 5.50 BOPSUI; ISURF Finished installation of drill nipple. Function tested 21 1/4" diverter system - OK. 05:30 - 06:30 1.00 DRILL I SURF Picked up 21 joints 5" HWDP and stood in stands. 06:30 - 07:00 0.50 DRILL SURF Held pre-spud meeting with drilling crew. Held diverter drill. 07:00 - 09:30 2.50 DRILL SURF Picked up and made up directional drilling BHA #1. 09:30- 13:00 3.50 DRILL SURF Drilled 12 1/4" surface hole from 109 ft. to 225ft. AST-2 hrs. 13:00 - 13:30 0.50 DRILL SURF POOH to top of mud motor. :13:30 - 14:00 0.50 DRILL SURF Picked up MWD tool and jars. 114:00-15:00 1.00 DRILL SURF Drilled to 244 ft. ART-1/4hr. 15:00 - 17:30 2.50 DRILL SURF Circulate and condition mud and build volume. 17:30 - 00:00 6.50 DRILL SURF Directionally drilled from 244 ft. to 549 ft. AST - 3 hrs. ART- 1 hr. 12/16/2000 00:00 - 06:00 6.00 DRILL SURF Directionally drilled to 858 ft. ART - 1 hr.; AST - 3 hrs. 06:00 - 08:00 2.00 DRILL SURF Pulled bit into conductor casing at 100 ft. while changing top drive connector to drill pipe thread. Had to back ream at 612 tt., 581 ft. and 458 ft. 08:00 - 10:00 2.00 DRILL SURF Changed top drive connector to 4" HT40 thread. 10:00 - 11:30 1.50 DRILL SURF RIH with bit. to 768 ft. 11:30 - 12:00 0.50 DRILL SURF Washed and reamed 768 ft. to 858 ft. 12:00 - 00:00 12.00 DRILL SURF Directionally drilled from 858 ft. to 1280 ft. AST - 8 hrs.; ART - 1 hr. 12/17/2000 00:00 - 22:00 22.00 DRILL SURF Directionally drilled 12 1/4" hole to 2640 ft. AST - 10.5 hrs. ART - 5 3/4 hrs. 22:00 - 23:00 1.00 DRILL SURF Circulate bottoms up. 23:00 - 00:00 1.00 DRILL SURF POOH for wiper trip from 2640 ft. to 956 ft. Had 15K overpull at 2018 ft. 12/18/2000 00:00 - 01:30 1.50 DRILL SURF Finished POOH to bit. Bit in excellent condition (1/1). 01:30 - 02:00 0.50 DRILL SURF Cleared floor prep. to cut drill line. 02:00 - 03:00 1.00 DRILL SURF Slipped and cut 92 ft. drill line. 03:00 - 03:30 0.50 DRILL SURF Serviced top drive. 03:30 - 04:30 1.00 DRILL SURF RIH to 2640 ft. to complete wiper trip. No problems while RIH. No fill. 04:30 - 00:00 19.50 DRILL SURF Drilled 12 1/4" surface hole from 2640 ft. to 4163 ft. AST - 2 hrs.: ART - 10 3/4 hrs. 12/19/2000 00:00 - 03:00 3.00 DRILL SURF Drlg From 4163 to 4314 ART 1.75, Up Wt 115, SO 80, Rt 95, WOB 25-30, 60 RPM, 6-8 TQ, 2530 PSI @ 83 SPM 03:00 - 04:00 1.00 DRILL 'SURF CBU 04:00 - 08:00 4.00 DRILL :SURF POH From 4314 to 180', SLM, Tite 1840-1782, 25K Overpull, Backreamed & Circ F/690-685, Wiped Clear ,08:00 - 10:00 2.00 DRILL SURF RIH F/180 to 4314, Took Wt (25K) @ 1210 & 1784 10:00 - 15:30 5.50 DRILL SURF Circ & Condition Mud; Pump Sweep Around; Add TorqueTrim & Lubtex, REDUCE Visc to 120 sec/qt 15:30 - 19:00 3.50 DRILL SURF Drop ESS & POH, Tite @ 1943 19:00 - 21:00 2.00 DRILL SURF L/D BHA 21:00 - 22:00 1.00 DRILL SURF Clean & Clear Floor 22:00 - 23:00 1.00 CASE SURF M/U Mandrel CSG Hanger on Landing Joint, Make Dummy Run through Diverter Spool, Pull & L/D in Pipe Shed 23:00 - 00:00 1.00 CASE SURF R/U 9 5/8 CSG Tools 12/20/2000 00:00 - 06:00 6.00 CASE SURF Run 9 5/8" 40# L80 BTC R3 CSG to 2130, Tagged Hard Bridge 06:00 - 07:00 1.00 CASE SURF Circ & Work CSG Thru Hard Bridge @ 2130 07:00 - 10:00 3.00 CASE SURF Finish Running 105 Jt 9 5/8 40# LB0 BTC R3 CSG to 4294 . Printed: 1/26/2001 4:35:42 PM RECEIVED BP EXPLORATION MAR 0 '] Z001 Page 2 of 9 Operations Summary ReportAlaskaOil & Gas Cons. Commission Anchorage Legal Well Name: Z-101 Common Well Name: Z-101 Spud Date: 12/15/2000 Event Name: DRILL+COMPLETE Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 7ES Rig Number: Sub Date From -To Hours Task Code Phase Description of Operations 12/20/2000 10:00 - 11:00 1.00 CASE SURF PJD Franks Circ & Wash Tool, PJU Dowel CMT Head 11:00 - 13:00 2.00 CASE SURF Circ & Reciprocate 165K Up 85K Down PJSM 13:00 - 16:30 3.50 CASE SURF Mix & Pump 75 BBL MudPush Spacer @ 10.4 ppg, Drop Bottom Plug, Mix & Pump 544 BBL, 689 sx Articset Lite 3 @ 10.7 ppg, Tailed with 68 BBL, 332 sx G @ 15.8, Drop Top Plug, Displace with Rig Pump, Continue to Reciprocate Until 175 BBL Lead Past Shoe, 200 BBL CMT to Surface, Bumped Plug to 3500, Floats Held, Full Returns, CIP 1630 Hrs 12/20/00 16:30 - 20:00 3.50 CASE SURF Clear Floor, L/D Landing Joint 20:00 - 00:00 4.00 CASE SURF N/D Bell Nipple, Annular Preventer, Dirverter Spool 12/21/2000 00:00 - 02:00 2.00 WHSUR SURF N/D Bell Nipple, Annular, & Diverter Spool 02:00 - 03:30 1.50 WHSUR SURF N/U CSG Head & TBG Spool; FMC Tested 1000 03:30 - 09:00 5.50 BOPSUR SURF N/U BOP, Install 2nd Annulus Valve on CSG Head 09:00 - 10:00 1.00 BOPSUR 'PROD1 M/U Test Jt, Set Test Plug 10:00 - 16:00 6.00 BOPSUR PROD1 Test BOP; All Lines, Rams, Valves, Manifold, Witnessed By John Crisp, AOGCC 16:00 - 17:00 1.00 BOPSUR PROD1 Pull Test Plug; Set Wear Bushing 17:00 - 17:30 0.50 DRILL !PROD1 Calibrate Sperry Sun Depth Counter 17:30 - 20:30 3.00 DRILL . PROD1 P/U BHA #2, Load MWDs 20:30 - 21:30 1.00 DRILL ' PROD1 Pick Up 30 Jts 4" DP 21:30 - 23:30 2.00 DRILL . PROD1 RIH (MWD Check Shot @ 2300') Tag Cmt @ 4182, Break Circ 23:30 - 00:00 0.50 DRILL PROD1 Test CSG to 3500 for 30 Min ;12/22/2000 00:00 - 02:30 2.50 DRILL PROD1 DRLG CMT 4182-4208, DRLG FC, CMT, FS, CMT, Clean Out Rathole, DRLG 20' New Formation to 4334 02:30 - 03:00 0.50 DRILL PROD1 Finish Displace Spud Mud to 9.0 ppg 4% KCL Mud @ 12 BPM, Pull Into CSG 03:00 - 03:30 0.50 DRILL PROD1 Perform FIT of 12.5 EMW; 566 psi, 9.0 ppg Mud, 3109 'I'VD 03:30 - 23:00 19.50 DRILL PROD1 Directional DRLG to 6265, Had One Overpull @ 4797-4811, Swept Hole WNVeighted (12 ppg) Hi Visc Pills, Saw 30-50% Increase in Returns, Fought Mud Weight Increases with Additions of KCL Brine, Fine Tune Shaker Screen Sizes, Maintain ECD @ > 1 ppg Over Mud Weight, Increased Flow Rate to 600 gpm for Hole Cleaning, AST 2.5, ART 10.5, WOB 5-20, RPM 50-80 TQ 5K Off, 9-10K On, !50K Up, 85K Down, 110K Rt, SPM 200 @ 2060 off, 2350 On, ROP 190-200 Ft/Hr 23:00 - 00:00 1.00 DRILL PROD1 CBU, Prep to Short Trip to Shoe 12/23/2000 00:00 - 00:30 0.50 DRILL PROD1 Finish CBU 00:30 - 03:00 2.50 DRILL PROD1 POH 21 Stds to CSG Shoe; 25K Pull @ 5800', Proper Hole Fill 03:00 - 03:30 0.50 DRILL PROD1 PJSM; Service TD 03:30 - 05:00 1.50 DRILL PROD1 RIH, No Problems 05:00 - 00:00 19.00 DRILL PROD1 Drlg, Attempt to Slide to Drop Angle, Motor Stalling Out, Added Stickless Beads @ 6374 (20 bbl @ 30#/bbl, Spot & Attempt to Slide, Little Success, After Consent, Added Slug of BDF 263 Lubricant @ 6420', able to Slide Better, Continue to Add BDF 263 to 1%, Drlg to 6834, AST 10 ART 13.5 HRS 12/24/2000 00:00 - 13:30 13.50 DRILL PROD1 Directional Drill to 7384, AST 5.5, ART 2.5 Hrs, Ability to Slide Improved by BDF 263 13:30 - 14:30 1.00 DRILL PROD1 Pump 20 BBL Weighted (3#/gal over) Visc Sweep Around, No Increase in Returns Noted 14:30 - 15:30 1.00 DRILL PROD1 Wiper Trip from 7384-5520, 35K Overpull @ 6085 & 5738, Wiper Through OK 15:30- 16:30 1.00 DRILL PROD1 RIH 5520-7384, No Problems 16:30 - 00:00 7.50 DRILL PROD1 Directional Drill from 7384-7943, ART 4.25 Hrs, Had 30K Overpull #@ 7815, Backreamed OK PU 210K Down 98K 130K Rt, 80 Rpm, 14K Tor, Printed: 1/26/2001 4:35:42 PM RECEIVED BP EXPLORATION MAR0 ~ ~10~e 3 of 9 Operations Summary Report Alaska Oil & Gas Cons. Commission Anchorage Legal Well Name: Z-101 Common Well Name: Z-101 Spud Date: 12/15/2000 Event Name: DRILL+COMPLETE Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 7ES Rig Number: Sub Date From-To Hours Task Code Phase Description of Operations 12/24/2000 16:30 - 00:00 7.50 DRILL PROD1 552 gpm 3090 psi WeB 12-15K 12/25/2000 00:00 - 11:00 11.00 DRILL PROD1 Drlg 8.75" Hole to 8596, ART 6.25 Hrs, 240K Up, 96K Down, 138 K Rt, 537 gpm @ 2910/3200 psi, WeB 18-23K, Tq 13K off, 14K on 11:00 - 12:00 1.00 DRILL PROD1 Sweep Hole W/35 BBL, Low/Hi Visc Pill 12:00 - 18:00 6.00 DRILL PROD1 Pull Into Shoe; Tight @ 7809, 7465, 7210, (20-25K Over) 5275 (30-35K Over) 45K Over @ 5010, Wash & Backream From 4917-4294 @ 101 Spm/500 psi 18:00 - 19:00 1.00 DRILL PROD1 Cut & Slip 105' Drlg Line, Adjust Brakes 19:00 - 19:30 0.50 DRILL PROD1 Service Top Drive 19:30 - 22:00 2.50 DRILL PROD1 Change Liners & Swabs, Both Pumps from 5.5" to 5" 22:00 - 00:00 2.00 DRILL PROD1 RIH F/4294-8596; Took Weight (25K) 4650-5630; Wiped Areas Clear 12/26/2000 00:00 - 00:30 0.50 DRILL PROD1 Pump Hi/Low Weighted Sweep to Help Clean Hole After Problematic Trip 00:30 - 16:00 15.50 DRILL PROD1 Drlg to 8988, ART 11.75 Hrs, 242K Up, 95K Down, 140 Rt, Rpm 80, Tq 13-15K, 561 Gpm 3250/3450 psi, Web 10-20K, MW 9.7 ppg 16:00 - 16:30 0.50 DRILL PROD1 Replace Suction Lip Seal # 1 Mud Pump, Center Cylinder 16:30 - 00:00 7.50 DRILL PROD1 Drlg to 9183 MD, 6990 ']'VD, ART 5.75 Hrs, 245K Up, 105 Down, 150K Rt, Rpm 80, Tq 12-13K, Web 15-18K 561 Gpm 3520/3850 psi, MW 10.3 ppg 12/27/2000 00:00 - 12:00 12.00 DRILL PROD1 Drlg to 9537 MD, 6668 TVD (Core Point) ART 9 Hrs, 245K Up,110K Down, 152K Rt 12:00- 12:30 0.50 DRILL PROD1 Circ 12:30 - 14:00 1.50 DRILL PROD1 Sweep Hole with 13.3#/Gal 25 BBL Pill 14:00 ~ 17:00 3.00 DRILL PROD1 POH F/9537-4210; 40K Overpull @ 8140, Wiped Through OK, Minor Overpulls @ 7995, 5785, 5800, Wiped Out OK 17:00 - 22:00 5.00 DRILL PROD1 Dump Mud System & Clean Pits, Take on Core Fluid 22:00 - 00:00 2.00 DRILL PROD1 RIH, Took Wt (25K) @ 5710-5760, Wipe Through Several Times, OK, Continue in Hole 12/28/2000 00:00 - 00:30 0.50 DRILL PROD1 Finish RIH to 9537 00:30 - 05:00 4.50 DRILL PROD1 Pump 50 BBL Spacer, Followed by 10.3 ppg Coring Fluid @ 8.5 BBL/Min 2500 psi, Clean Possum Bellys, Pump Dry Job 05:00 - 07:30 2.50 DRILL PROD1 POH From 9537- 4200', Had One 30K Overpull @ 7343, Wiped Clear; OK 07:30 - 09:30 2.00 DRILL PROD1 Finish POH 09:30 - 12:30 3.00 DRILL PROD1 PJSM, L/D BHA 12:30 - 13:00 0.50 DRILL PROD1 Clear & Clean Rig 13:00 - 13:30 0.50 DRILL PROD1 Pull Wear Bushing 13:30 - 17:30 4.00 DRILL PROD1 Set Test Plug, Test All Lines, Valves, Rams, Annular to 250 Low, 5 Min, 3500 Hi for 10 Min, State Waived Witnessing, Jeff Jones 17:30 - 18:00 0.50 DRILL PROD1 Set Wear Bushing 18:00 - 20:30 2.50 DRILL PROD1 PJSM, P/U Core Equip 20:30 - 00:00 3.50 DRILL PROD1 RIH for Core #1 12/29/2000 00:00 - 01:00 1.00 DRILL PROD1 RIH W/Core Bbl #1 to 9445 01:00 - 02:00 1.00 DRILL PROD1 Rotate & Reciprocate Pipe, Break Circ Slow, Rotary Stalled, Pull 65K Over, Kill Pump, Pull 75K Over, Jar X2, Pipe Came Free 02:00 - 04:00 2.00 DRILL PROD1 Rotate & Reciprocate, Increase Pump Rate to 400 gpm, PP 400 225 Up, 110 Down, 155 Rotate Drop Ball, Take SPRs 04:00 - 00:00 20.00 DRILL PROD1 Cut Core # 1 From 9537-9579, Slow ReP, WeB 15-25K, 50-80 RPM, 10-12 Tq, 301gpm @ 1830 psi, Hrs on Core Head= 20 12/30/2000 00:00 - 00:30 0.50 DRILL PROD1 Terminate Core Due to No ReP, PU & Break Core w/10K Overpull 00:30 - 01:30 1.00 DRILL PROD1 POH F/9579-9090 01:30 - 05:00 3.50 DRILL PROD1 Pump Dry Job & POH F/9090-3026 05:00 - 06:00 1.00 DRILL PROD1 POH F/3026-1249 @ 3 Minute/Std as per Bp Core Recovery Protocol Printed: 1/26/2001 4:35:42 PM RECEIVED 0 1 9nnl BP EXPLORATION ~-~'~e 4 of ~ Operations Summary Report ^laska Oil & Gas Cons. Commission Anchorage Legal Well Name: Z-101 Common Well Name: Z-101 Spud Date: 12/15/2000 Event Name: DRI LL+COMPLETE Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 7ES Rig Number: Sub Date From-To Hours Task Code Phase Description of Operations 12/30/2000 06:00 - 07:30 1.50 DRILL PROD1 POH F/1249-412 @ 6 Minute/Std 07:30 - 08:00 0.50 DRILL PROD1 POH F/412-197 @ 15 Minute/Std 08:00 - 08:30 0.50 DRILL PROD1 PJSM, Recovering Core 08:30 - 09:00 0.50 DRILL PROD1 POH F/197-103 09:00 - 10:00 1.00 DRILL PROD1 Pull Inner Barrel, L/O Core (Recovered 37.4', cut 42'), Core Catcher was Jamed, Core Head was Packed Off, 1" Diameter Piece of Sandstone was in the Catcher 10:00 - 12:00 2.00 DRILL PROD1 P/U New Aluminum Inner Core BBL, Space Out, RR Same Core Head, See Bit Grade 12:00- 13:30 1.50 DRILL PROD1 RIH W/Core BBL#2, BHA 13:30 - 19:30 6.00 DRILL PROD1 RIH to 9484, Filled Pipe @ 4208 & 7284 19:30 - 22:00 2.50 DRILL PROD1 CBU, Rotate & Reciprocate, Drop Ball & Circ Down, Take SPRs 22:00 - 00:00 2.00 DRILL PROD1 Tag Bottom @ 9577.2 (2' Core Debris/Rubble) Start Cutting Core # 2 12/31/2000 00:00 - 06:00 6.00 DRILL PROD1 Core To 9598, ADT 6 Hrs, ROP Slow 06:00 - 09:00 3.00 DRILL PROD1 Pump Dry Job & POH to 6967, Tight 09:00 - 09:30 0.50 DRILL PROD1 Attempt to Pull Through Tight Spot, Failed, Break Circ & Backream Through Tight Spots to 6900, Kill Pump & Work Though Spots W/O Pumps, OK 09:30 - 11:00 1.50 DRILL PROD1 POH F/6900-3026 11:00 - 15:30 4.50 DRILL PROD1 Continue POH & Rate Required for BP Core Recovery Protocol 15:30 - 16:00 0.50 DRILL PROD1 PJSM; Core Handling 16:00 - 18:30 2.50 DRILL PROD1 L/D Inner bbl & Core; Recovered 21.8'of Core, Replace Core Head, Replace Inner Bbl (90') 18:30 - 19:30 1.00, DRILL PROD1 RIH W/BHA 19:30 - 21:00 1.50 DRILL PROD1 PJSM, Cut & Slip Drlg Line 21:00 - 21:30 0.50 DRILL PROD1 Service Top Drive 21:30 - 23:30 2.00 DRILL PROD1 Continue RIH W/Core Barrel # 3 to 4240 23:30 - 00:00 0.50 DRILL PROD1 Fill Pipe, Break Circ 1/1/2001 00:00 - 03:30 3.50 DRILL PROD1 RIH f/4240' - 9505'. 03:30 - 05:00 1.50 DRILL PROD1 Wash to 9598'. CBU while cond mud. 05:00 - 14:30 9.50 DRILL PROD1 Cored f/9598'-9637'. 95 rpm, 5-9K WOB, 305 gpm. Core bbl jammed, ART=9 hrs 14:30 - 15:30 1.00 DRILL PROD1 Condition mud, prop dry job. 15:30 - 17:30 2.00 DRILL PROD1 POH, Had 50K Overpull @ 6985, Wiped Thru, Continue POH 17:30 - 18:00 0.50 DRILL PROD1 Flow Check @ Shoe 18:00 - 00:00 6.00 DRILL PROD1 Continue POH W/Core #3, Pull Slowly as per bp Core recovery Protocol 1/2/2001 00:00 - 01:00 1.00 DRILL PROD1 Finished POOH with core #3. 01:00 - 04:00 3.00 DRILL PROD1 Laid down 1 section of core outer core barrel and 2 inner core barrels. Picked up 1 section inner barrel. Made up RR Core Bit #1 and spaced inner barrel. 04:00 - 05:00 1.00 DRILL PROD1 Serviced rig and top drive. 05:00 - 11:00 6.00 DRILL PROD1 RIH with core barrel ~ to 9621 ft. w/o incident. 11:00 - 13:00 2.00 DRILL PROD1 Circulated bottoms up and took SPR pressures. 13:00 - 22:00 9.00 DRILL PROD1 Drilled rotary core from 9637 - 9657 ft. at average rate of 2.22 ft/hr. ART - 9 hrs. Received orders from geologist to suspend coring !operation due being below objective interval. 22:00 - 22:30 0.50 DRILL PROD1 Pumped 40 bbl. 13.3 ppg dry job. Broke off core with 20K. 22:30 - 00:00 1.50 DRILL PROD1 POOH to 6041 ft. w/o incident or overpulls. 1/3/2001 00:00 - 06:00 6.00 DRILL PROD1 Finished POOH with core barrel #4. 06:00 - 07:30 1.50 DRILL :PROD1 Laid down core. Recovered 20.5 ft. SHALE of 20.5 ft. cut. Laid down core barrels. Bit condition 1/1. 07:30 -08:30 1.00 DRILL PROD1 Clear floor and loaded out coring equipment. Pulled wear ring. Printed: 1/26/2001 4:35:42 PM RECEIVED BP EXPLORATION MAR 0 1 2001Page5of9 Operations Summary Report Alaska Oil & Gas Cons. Commission Anchorage Legal Well Name: Z-101 Common Well Name: Z-101 Spud Date: 12/15/2000 Event Name: DRI LL+COMPLETE Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 7ES Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 1/3/2001 08:30 - 13:30 5.00 DRILL PROD1 Tested BOPE, safety valve, dart valve, standpipe, kelly hose, kelly valves to 250 psi Lo/3500 psi Hi pressure per BP Amoco and AOGCC requirements. Had previously tested choke manifold and kill lines while POOH. Witness of test waived by John Crisp, AOGCC agent. Blind rams would not hold test. 13:30 - 16:30 3.00' DRILL PROD1 Opened BOP blind/shear rams. Found lower seal cut. Replaced and repaired blind/shear ram. Tested to 250/3500 psi. 16:30 - 17:00 0.50 DRILL PROD1 Pulled BOP test plug and installed wear ring. 17:00 - 20:00 3.00 DRILL PROD1 Made up directional drilling BHA with rerun PDC bit and straight PDM. 20:00 - 21:30 1.50 DRILL PROD1 RIH to base of surface casing. 21:30 - 22:30 1.00 DRILL PROD1 Filled drill pipe and CBU with mud pretreated with 3% drilling lubricant. 22:30 - 23:30 1.00 DRILL PROD1 RIH to 6260 ft. Sperry Sun depth encoder within drawworks clutch housing broke leading to broken air control lines. 23:30 - 00:00 0.50 DRILL DATA PROD1 POOH to casing shoe to repair clutch air lines. 1/4/2001 00:00 - 01:30 1.50 DRILL DATA PROD1 Finished changing out Sperry Sun depth encoder on drawworks and repairing air lines. 01:30 - 04:00 2.50 DRILL PROD1 RIH from surface casing to 9431 ft. ~04:00 - 06:30 2.50 DRILL PROD1 Ran MWD MADD pass log thru interval 9431 - 9627 ft. 06:30 - 07:00 0.50 DRILL PROD1 Logged, washed and reamed interval 9627 - 9657 ft. 07:00 - 11:45 4.75 DRILL PROD1 Drilled by rotating from 9657 ft. to 9950 ft. TD. ART - 3 hrs. 11:45 - 14:30 2.75 DRILL PROD1 Circulated 300% bottoms up at 550 gpm with 100 rpm rotary. Recovered abundant cuttings. 14:30 - 17:30 3.00 DRILL PROD1 POOH with bit to surface casing for wiper trip. Had 40K overpulls at 7125', 7100' and 6985'. Worked rite spots dry. Possible evidence of shallow keyseat at 6140 ft. 17:30 - 18:30 1.00 DRILL ' PROD1 Slipped and cut drill line. Checked top drive booster motor and adjusted drawworks brakes. 18:30 - 21:00 2.50 DRILL PROD1 RIH to 9950 ft. to complete wiper trip. 21:00 - 00:00 3.00 DRILL PROD1 Circulated and conditioned mud. Pumped 50 bbl Hi vis sweep and recovered abundant cuttings. Pumped second sweep. Circulated at 550 gpm, with 100 rpm rotary. 1/5/2001 00:00 - 00:30 0.50 DRILL PROD1 Pump dry job. 00:30 - 05:30 5.00 DRILL PROD1 POOH to BHA. 05:30 - 06:30 1.00 DRILL PROD1 Laid down directional tools and cleared floor. 06:30 - 07:00 0.50 EVAL PROD1 Held PJSM with SWS and Nabors crew. 07:00 - 08:00 1.00 EVAL PROD1 Rigged up SWS and made up Platform Express logging tool string. 08:00 - 11:30 3.50 EVAL PROD1 RIH running Induction, Gamma Ray, Sonic and Neutron logs on trip in hole. Schlumberger TD - 9945 ft. Ran repeat section log TD - 9400 ft. Had slight overpull in Kaparuk Sand at 9600 ft. Ran tools back to TD and began logging run. Tools hung with bottom of string at 9620 ft. Collapsed caliper arms and tools jumped to 9612 ft. then stuck. 11:30 - 15:30 4.00 EVAL KEYS PROD1 Worked SWS line to 9500 lbs. maximum line pull while waiting on fishing tools. Line stretch calculations indicating line stuck at 7000 ft. +/-. Load cell in cable head on top of tools not indicating any pull on tools (not even tool weight). 15:30 - 16:00 0.50 FISH KEYS PROD1 Held PJSM with Nabors, Baker Fishing and Schlumberger. 16:00 - 16:45 0.75 FISH KEYS PROD1 Tensioned and clamped SWS logging cable. Cut and headed cable for stripover operation. 16:45 - 18:30 1.75 FISH KEYS PROD1 Hung SWS sheave at crown and RU SWS. 18:30 - 20:00 1.50 FISH KEYS PROD1 Made up 8 1/8" overshot w/3 3~8" grapple and WLEG, oil and bumper jars and pump out sub on HWDP. 20:00 - 00:00 4.00 FISH KEYS PROD1 RIH with overshot stripping over logging cable to 3229 ft. 1/6/2001 00:00 - 10:00 10.00 FISH GEOM PROD1 Continued RIH with overshot, stripping over logging cable to 9479 ft. PU Printed: 1/26/2001 4:35:42 PM RECEIVED ,. Ra.qe6of9 BP EXPLORATION Alaska Oil & Gas Cons. bornmlssT~n Operations Summary Report Anchorage Legal Well Name: Z-101 Common Well Name: Z-101 Spud Date: 12/15/2000 Event Name: DRILL+COMPLETE Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 7ES Rig Number: Sub Date From-To Hours Task Code Phase Description of Operations 1/6/2001 00:00 - 10:00 10.00 FISH GEOM PROD1 - 195K, SO - 112K. 10:00 ~ 11:00 1.00 FISH GEOM PROD1 Installed hang off sub and suspended cable. Broke circulation at 200 gpm, 1030 psi and circulated drill pipe volume at 950 psi, 200 gmp. 11:00 - 12:00 1.00 FISH GEOM PROD1 Tagged TOF at 9554 ft. Pushed fish down hole to 9562 ft. as indicated by logging cable travelling downhole. Pulled fish up hole to 9547 ft. Worked cable to 7600 lbs. pull several times to latch fish. 12:00 - 12:45 0.75 FISH GEOM PROD1 Laid down single DP, installed hang off sub and pressured to 500 psi. Began circulating at 200 gpm, 1125 psi indicating fish not latched. 12:45 - 13:30 0.75 FISH GEOM , PROD1 Picked up stand DP. Tagged with 6K wt. at 9562 ft. and pushed to 9568 ft. with indication of latchup. Worked cable to 8500 lbs. 13:30 - 16:30 3.00 FISH GEOM PROD1 Installed hang off sub pressured DP to 950 psi static indicating fish latched. Stood back stand and broke cable weak link. Spooled cable on truck. 16:30 - 18:00 1.50 FISH GEOM PROD1 Represured DP to 1100 psi to confirm fish in grapple. Sheared pump out sub and began circulating at 250 gpm, 1400 psi. Pulled fish up hole to 9472 ft. had brief 30K overpull then 10-15K drag. Circulated bottoms up at 450 gpm, 3200 psi. 18:00 - 23:30 5.50 FISH GEOM PROD1 POOH to top of jars. Had tire spot with 25-30K drag in HRZ from 9385 ff. to 9292 ff. 23:30 - 00:00 0.50 FISH GEOM PROD1 Laid down BHA and prepped to lay down logging tools. 1/7/2001 00:00 - 02:30 2.50 FISH GEOM PROD1 Finished laying down fishing tools and logging tools. 02:30 - 05:00 2.50 EVAL PROD1 Tested and calibrated logging tools. Rigged up Schlumberger. 05:00 - 09:00 4.00 EVAL PROD1 Ran Induction, Spectral GR, Sonic, Density and Neutron logs 7500-4294 ft. 09:00 - 10:30 1.50 EVAL PROD1 Rigged down Schlumberger. 10:30 ~ 11:00 0.50 EVAL PROD1 Serviced rig and top drive. 11:00 - 11:15 0.25 EVAL PROD1 Picked up 6 1/2" drill collar for conditioning trip BHA. Had accident on rig floor involving injury to roughneck. 11:15 - 13:30 2.25 EVAL ACDT PROD1 Suspended operations while evacuating injured roughneck from rig floor. 13:30 - 14:30 1.00 EVAL PROD1 Held safety meeting. 14:30 - 19:00 4.50 EVAL DPSY PROD1 Repaired damage to pipe shed structure and hydraulics on pipe skate. 19:00 - 20:30 1.50 EVAL PROD1 Made up cleanout BHA. 20:30 - 22:30 2.00 EVAL PROD1 RIH with bit to 4192 ft. base of surface casing. 22:30 - 00:00 1.50 EVAL WTHR PROD1 Circulating at 120 gpm with bit at 4192 ft. to conserve fuel and water . while WOW! 1/8/2001 00:00 - 21:30 21.50 EVAL WTHR PROD1 'Circulated at 4200 ft., base of surface casing, while WOW Phase II1. 21:30 - 00:00 2.50 EVAL PROD1 RIH with cleanout BHA to 7372 ft. 1/9/2001 00:00 - 01:30 1.50= EVAL PROD1 RIH with bit and cleanout BHA to 9300 ft. 01:30 - 07:30 6.00 EVAL PROD1 i Washed to 9487 ft. Reamed rite hole 9487 ft. to 9560 ft. Reamed bridge at 9562-9565 ft. Washed and reamed 9565-9950 ft. Had 15 ft. fill. 07:30 - 09:00 1.50 EVAL PROD1 Circulated and conditioned mud. Pumped Hi Vis sweep. Recovered normal amounts of sand and shale. 09:00 - 10:30 1.50 EVAL PROD1 , Made wiper trip to 9176 ft. Had 40K overpulls thru Kaparuk Sand and lesser pulls in HRZ. Worked pipe back to 9812 ft. with stackouts in interval 9552-9600 ft. Had to ream at 9812 ft. Washed to 9950 ft. TD. 10:30 - 11:30 1.00 EVAL PROD1 Pumped Hi Vis sweep. Circulated and conditioned mud. 11:30 - 12:00 0.50 EVAL PROD1 :Made wiper trip 9950-9400 ft. Had 15-25K overpulls in Kaparuk Sand interval 9620-9552 ft. 12:00 - 14:30 2.50 EVAL PROD1 .Circulated and conditioned mud adding 5 ppb Baranex. 14:30 - 15:00 0.50 EVAL PROD1 :Spotted mud pill containing 5% lubricants and 8 ppb Baranex in interval '9750-9250 ft. Printed: 1/26/2001 4:35:42 PM RECEIVED MAR 0 1 2001 BP EXPLORATION Page 7 of 9 Alaska Oil & Gas Cons. Commission Operations Summary ReportAnchorage Legal Well Name: Z-101 Common Well Name: Z-101 Spud Date: 12/15/2000 Event Name: DRILL+COMPLETE Start: 12/13/2000 End: :Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 7ES Rig Number: ' Sub Date From-To Hours Task Code Phase Description of Operations 1/9/2001 15:o0 - 20:00 5.00 EVAL PROD1 POOH with normal drag and no tite spots. 20:00 - 21:00 1.00 EVAL PROD1 Stood HWDP and LD drill collars. 21:00 - 22:00 1.00 EVAL PROD1 Serviced rig and top drive. 22:00 - 22:30 0.50 EVAL PROD1 Held PJSM with Schlumberger and rig crew re DPC logging. 22:30 - 00:00 1.50 EVAL PROD1 Rigged up Schlumberger and picked up MDT pressure and sampling tool and CMR logging tool. Began testing tool string. 1/10/2001 00:00 - 02:30 2.50 EVAL PROD1 Tested and calibrated logging tools. Found MDT tool not responding. Laid down logging tools. 02:30 - 03:30 1.00 EVAL LOG PROD1 Backup MDT tool not available. Picked up Schlumberger RFT tool and CMR logging tools. Surface tested and calibrated tools. 03:30 - 06:00 2.50 EVAL PROD1 RIH with DPC logging tools to 4200 ft. 06:00 - 07:30 1.50 EVAL PROD1 Slipped and cut drill line and adjusted brakes. 07:30 - 08:00 0.50 EVAL PROD1 Installed wireline sheave in derrick. 08:00 - 08:30 0.50 EVAL PROD1 Circulated hole volume and balanced light streak in mud. 08:30 - 10:00 1.50 EVAL PROD1 RIH with logging tools to 6066 ft. 10:00 - 12:00 2.00 EVAL PROD1 Installed drill pipe side door and latched onto logging tools. Tested tools. Found RFT tools not responding. Decision made to continue in hole while waiting for delivery of new surface control panel. 12:00 - 14:30 2.50 EVAL LOG PROD1 Continued RIH to 6254 ft. Lost communication with CMR logging tools. 14:30 - 20:00 5.50 EVAL LOG PROD1 POOH to side door and POOH with logging cable. Found cable shorted. Cut 500 ft. and cable tested OK. Reheaded cable and relatched tools. Both RFT and CMR tools checked OK. 20:00 - 00:00 4.00 EVAL PROD1 RIH with DPC logging tools to 8025 ft. 1/11/2001 00:00 - 01:00 1.00 EVAL PROD1 RIH with CMR Icg and RFT tools to 9559 ft. 01:00 - 06:30 5.50 EVAL PROD1 Took formation pressures at 9559',9589',9593', 9596'. Attempted formation fluid sample at 9596' for 2 hrs. Attempted RFT pressures at 9609',9617',9629', and 9635'. Tool appeared to lose function. 06:30 - 11:00 4.50 EVAL PROD1 Ran CMR Icg 9775' - 9500'. 11:00 - 12:00 1.00 EVAL PROD1 Pulled DP and logging tools to 7480 ft. 12:00 - 18:30 6.50 EVAL PROD1 Ran CMR Icg 7451' to 6233'. 18:30 - 23:00 4.50 EVAL PROD1 Functioned DPC RFT tools OK. Took RFT formation pressures at program depths from 6350' to 7347't. 23:00 - 00:00 1.00 EVAL PROD1 POOH w/DP to side door entry sub. 1/12/2001 00:00 - 02:00 2.00 EVAL PROD1 POOH to side door entry sub. POOH with logging cable. Laid down side door sub. 02:00 - 02:30 0.50 EVAL PROD1 Broke circulation and pumped dry job. 02:30 - 03:30 1.00 EVAL PROD1 POOH to surface casing shoe. 03:30 - 04:30 1.00 EVAL PROD1 Rigged down Schlumberger and serviced rig. 04:30 - 06:30 2.00 EVAL PROD1 POOH to logging tools. i06:30 - 08:00 1.50 EVAL PROD1 PJSM. Laid down CMR and RFT logging tools. !08:00 - 09:00 1.00 EVAL PROD1 PJSM. Picked up sidewall coring tool. 09:00 - 12:15 3.25 EVAL PROD1 RIH with sidewall core gun. Could not get below 6060 ft. POOH. 12:15 - 13:30 1.25 EVAL PROD1 Added logging tool weight bar and roller sub to tool string. 13:30 - 18:30 5.00 EVAL PROD1 RIH with core gun. Attempted 45 sidewall cores. Recovered 45 cores. 18:30 - 19:30 1.00 EVAL PROD1 Rigged down Schlumberger. 19:30 - 20:00 0.50 CLEAN COMP Pull wear bushing and install BOP test plug. 20:00 - 23:30 3.50 CLEAN COMP Tested BOP pipe rams, blind rams, annular preventer, safety valve, dart Printed: 1/26/2001 4:35:42 PM RECEIVED BP EXPLORATION MAR 0 ]. ~00t Page 8 of 9 Operations Summary RepOl~laska Oil & Gas Cons. Commission Anchorage Legal Well Name: Z-101 Common Well Name: Z-101 Spud Date: 12/15/2000 Event Name: DRILL+COMPLETE Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 7ES Rig Number: Sub Date From-To Hours Task Code Phase Description of Operations 1/12/2001 20:00 - 23:30 3.50 CLEAN COMP valve, kelly valves, choke manifold, kill line, standpipe and kelly hose to 250/3500 psi per BP Amoco and AOGCC requirements. Witness of test waived by John Crisp, AOGCC agent. 23:30 - 00:00 0.50 CLEAN COMP PJSM. Picked up 8 1/2" bit and 3 - 6 1/2" drill collars. 1/13/2001 00:00 - 06:30 6.50 CLEAN COMP RIH with cleanout BHA to 9550 ft. 06:30 - 08:30 2.00 CLEAN COMP Washed and reamed hole from 9550 ft to 9950 ft. TD. 08:30 - 10:00 1.50 CLEAN COMP Circulated Hi Vis sweep surface to surface at 520 gpm with 113 rpm rotary. 10:00 - 11:00 1.00. CLEAN COMP Made wiper trip to 9400 ft. Had 60K overpulls at 9895 ft and 9575 ft. and 20-50K overpulls throughout interval. Had to circulate in order to pull thru interval 9575-9550 ft. 11:00 - 12:30 1.50 CLEAN COMP RIH to TD. Had to work hole at 9545-9555 ft. to 35K weight and 9643 ft. to 50K weight. 12:30 - 14:00 1.50 CLEAN COMP Circulated bottoms up at 530 gpm, 110 rpm rotary. Recovered moderate amount of cuttings. Pumped dry job. 14:00 - 17:00 3.00 CLEAN COMP POOH to casing shoe for wiper trip. 17:00 - 19:00 2.00 CLEAN COMP Slipped and cut drill line and serviced top drive. 19:00 - 22:30 3.50 CLEAN COMP RIH to TD to complete wiper trip. Did not encounter any significant resistance. 22:30 - 00:00 1.50 CLEAN COMP Circulated Hi Vis sweep surface to surface at 540 gpm, 110 rpm rotary. 1/14/2001 00:00 - 02:30 2.50 CLEAN COMP Finished circulating Hi Vis sweep surface to surface. Increased lubricant concentration in mud to 5%. 02:30 - 03:00 0.50 CLEAN , COMP POOH laying down drill pipe. 03:00- 04:30 1.50 CLEAN FLOR COMP Repaired pipe skate. 04:30 - 12:00 7.50 CLEAN COMP POOH laying down drill pipe. Had 25K overpull at 9570' and 9547'. Worked hole - OK. 12:00 - 13:30 1.50 CLEAN COMP Laid down BHA. 13:30 - 18:30 5.00 CLEAN COMP Pulled wear bushing. PJSM. Installed 7" rams in BOP. Tested BOP to 2500 psi. RU casing handling equipment. 18:30 - 19:00 0.50 CASE COMP Made up casing hanger on landing joint. Seated hanger in wellhead and marked joint. 19:00 - 19:30 0.50 CASE COMP PJSM with Nabors, GBR. 19:30 - 20:00 0.50 CASE COMP Made up float equipment and test same for circulation. 20:00 - 00:00 4.00 CASE COMP RIH picking up 7" casing. 1/15/2001 00:00 - 12:30 12.50 CASE COMP RIH picking up 7" casing to 9923 ft. Had to work casing past tight spots at 9850' and 9870'. Casing stuck on bottom. Worked up to 375K (135K overpull). Landed hanger with 96K weight. 12:30 - 15:30 3.00 CEMT COMP Circulated and conditioned mud. Increased circulation rate to 7.0 bpm, 980 psi. Rigged down Franks tool and installed cementing head. 15:30- 15:45 0.25 CEMT COMP Held PJSM with Nabors, Dowell, Baroid, Peak, FMC. 15:45 - 16:30 0.75 CEMT COMP Circulated hole while batch mixing cement. 16:30 - 19:30 3.00 CEMT COMP Pumped 5 bbls. preflush and tested lines to 4500 psi. Pumped 15 bbls preflush and 75 bbls MudPUSH spacer weighted to 11.0 ppg. Dropped bottom plug. Mixed and pumped 130 bbls of LiteCRETE cement mixed to 11.5-11.6 ppg. Pumped 67 bbls of Class G cement from batch mixer weighted to 15.8 ppg. Washed up cementing lines to floor. Dropped top plug and displaced cement with 368 bbls. seawater at average rate of 6.23 bpm. Final rate of 3.0 bpm with 1715 psi. Bumped plug with 3063 psi and held pressure for 5 minutes. Bled off pressure and floats held OK. WOC at 19:30 hrs. 19:30 - 21:00 1.50 RUNCOI~! COMP Rigged down casing equipment and landing joint. Cleared floor and loaded out tools. 21:00 - 22:30 1.50 RUNCOr~! COMP Installed 9 5/8'" X 7" packoff and tested to 5000 psi - OK Printed: 1/26/2001 4:35:42 PM BP EXPLORATION Page 9 of 9 Operations Summa Report Alaska 0il & Gas Cons. Commission 'Legal Well Name: Z-101 Anchorage Common Well Name: Z-101 Spud Date: 12/15/2000 Event Name: DRILL+COMPLETE Start: 12/13/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 7ES Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 1/15/2001 22:30 - 00:00 1.50 RUNCOI~ COMP Rigged up to run 3 1/2" completion. Installed second annulus valve. 1/16/2001 00:00 - 01:00 1.00 RUNCOI~ COMP Conducted PJSM for running 3-1/2" tubing. 01:00 - 09:00 8.00 RUNCOI~ COMP RIH w/9.3# L-80 8rd tubing with GLM's to 6144'. 09:00 - 10:00 1.00 CASE COMP Tested 7" casing to 3000 psi. 10:00 - 15:00 5.00 RUNCOI~q COMP Finished run 3-1/2" completion to 9444'. 15:00 - 19:30 4.50 RUNCOI~ COMP Reverse circulate to clean seawater and corrosion inhibitor. 19:30 - 20:30 1.00 RUNCOI~ COMP Land tubing, RILDS. 20:30 - 22:00 1.50 RUNCOI~ COMP Dropped ball. Pressure tubing to 3500 psi, 30 min test good. Bleed tubing pressure to 1500 psi. Pressure annulus to 3500 psi, 30 rain test good. Bleed tubing pressure, sheared RP. LID landing jt. 22:00 - 23:00 1.00 BOPSUF COMP Shut blind rams, changed top set pipe rams from 7" to 3-1/2"x6". 23:00 - 00:00 1.00 BOPSUF',COTR COMP Attempted to set TWC. Did not set correctly, unseated cocked on top of hanger. Wait on magnet to fish TWC. 1/17/2001 00:00 - 01:00 1.00 CASE COTR COMP Pumped 100 bbls H20 and 65 bbls diesel in 7" x 9-5~8" casing annulus for freeze protection. 01:00 - 03:00 2.00 BOPSUF REME COMP Recovered TWC with magnet. (Dropped on side in wellhead) 03:00 - 03:30 0.50 BOPSUF COMP Installed TWC and tested to 3000 psi. 03:30 - 05:30 2.00 BOPSUR COMP N/D BOP's and DSA. 05:30 - 08:00 2.50 BOPSUR COMP N/U adapter flange and tree. Tested to 5000 psi. 08:00 - 09:00 1.00 RUNCOI~ COMP Serviced top drive. 09:00 - 10:30 1.50 WHSUR COMP R/U DSM and pulled TWC w/lubricator. 10:30 - 13:00 2.50 RUNCOI~ ,COMP R/U and pumped 65 bbls diesel freeze protect. Allowed to U-tube. 13:00 - 14:30 1.50 WHSUR COMP Set BPV. Removed secondary annular valve. Secured well. Cleaned ~its. Released rig @ 1430 hrs 1/17/01. Printed: 1/26/2001 4:35:42 PM 18-J an-01 AOGCC 3001 Porcupine Drive Anchorage, AK 99501 Definitive Survey Re: Distribution of Survey Data for Well Z-101 Dear Dear SidMadam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 'MD 9,950.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) North Slope Alaska Alaska Drilling & Wells PBU_WOA Z Pad, Slot Z-101 Z-101 Surveyed: 4 January, 2001 SURVEY REPORT 26 January, 2001 Your Ref: AP1500292297800 Surface Coordinates: 5959359.86 N, 599659.28 E (70° 17' 54.0954"N, 149° 11'34.5366" VIO Kelly Bushing: 81.80ft above Mean Sea Level BRILLINB S[E RVI I~E~ 5 Survey Ref: svy10724 A Halliburton Company SPerry-Sun Drilling Services Survey Report for Z-lOl Your Ref: AP1 500292297800 Surveyed: 4 January, 200~ DE FINITIVE North Slope Alaska Measured Depth (ft) Incl. 0.00 0.000 0.000 147.02 0.220 64.030 230.77 0.650 344.710 275.73 1.290 332.190 325.24 1.370 332.950 356.79 1.510 330.560 386.95 1.940 323.890 417.62 2.550 315.980 449.22 3.050 312.810 479.62 3.600 313.200 513.62 3.830 315.800 539.97 4.190 315.860 574.90 4.830 319.170 602.54 5.530 322.220 634.56 6.660 325.700 661.47 8.140 329.120 694.24 9.860 332.420 726.63 11.340 334.180 758.28 12.020 335.780 788.08 12.280 335.980 828.10 12.750 336.430 858.82 13.120 336.290 891.98 13.100 336.190 920.84 13.660 334.950 952.26 14.400 332.650 Sub-Sea Depth (ft) -81.80 65.22 148.97 193.92 243.42 274.96 305.10 335.75 367.31 397.66 431.59 457.88 492.70 520.22 552.06 578.75 611.11 642.95 673.94 703.08 742.15 772.09 804.38 832.46 862.94 Vertical Depth (ft) Local Coordinates Northings Eastings (ft) (ft) 0.00 0.00 N 0.00 E 147.02 0.12 N 0.25 E 230.77 0.65 N 0.27 E 275.72 1.35 N 0.03W 325.22 2.37 N 0.56W 356.76 3.06 N 0.94W 386.90 3.82 N 1.43W 417.55 4.73 N 2.21W 449.11 5.81N 3.32W 479.46 7.01N 4.61W 513.39 8.56 N 6.18W 539.68 9.88 N 7.46W 574.50 11.91N 9.31W 602.02 13.84 N 10.89W 633.86 16.59 N 12.88W 660.55 19.52 N 14.74W 692.91 24.00 N 17.23W 724.75 29.32 N 19.90W 755.74 35.13 N 22.60W 784.88 40.85 N 25.17W 823.95 48.79 N 28.66W 853.89 55.09 N 31.42W 886.18 61.97 N 34.45W 914.26 68.05 N 37.22W 944.74 74.88 N 40.58W 981.90 14.620 330.740 891.64 973.44 1010.85 15.470 329.920 919.59 1001.39 1041.82 17.270 329.610 949.31 1031.11 1074.56 19.560 329.730 980.37 1062.17 1107.11 20.960 330.080 1010.90 1092.70 81.42 N 44.10W 87.95 N 47.82W 95.49 N 52.22W 104.41N 57.44W 114.17 N 63.09W Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/100ft) 5959359.86 N 599659.28 E 5959359.99 N 599659.53 E 5959360.52 N 599659.54 E 5959361.21N 599659.23 E 5959362.22 N 599658.69 E 5959362.91N 599658.30 E 5959363.66 N 599657.80 E 5959364.56 N 599657.01 E 5959365.62 N 599655.89 E 5959366.81N 599654.58 E 5959368.33 N 599652.99 E 5959369.64 N 599651.69 E 5959371.64 N 599649.81E 5959373.55 N 599648.21 E 5959376.28 N 599646.18 E 5959379.18 N 599644.29 E 5959383.63 N 599641.74 E 5959388.91N 599639.00 E 5959394.69 N 599636.21E 5959400.38 N 599633.57 E 5959408.26 N 599629.97 E 5959414.53 N 599627.13 E 5959421.37 N 599624.01 E 5959427.41 N 599621.16 E 5959434.20 N 599617.71 E 5959440.69 N 599614.10 E 5959447.17 N 599610.29 E 5959454.65 N 599605.80 E 5959463.50 N 599600.46 E 5959473.18 N 599594.68 E 0.15 0.77 1.49 0.17 0.48 1.57 2.23 1.66 1.81 0.84 1.37 1.98 2.72 3.71 5.74 5.48 4.68 2.38 0.88 1.20 1.21 0.09 2.18 2.95 1.78 3.03 5.82 7.00 4.32 Alaska Drilling & Wells PBU WOA Z Pad Vertical Section Comment 0.00 -0.03 0.42 1.17 2.31 3.11 4.01 5.19 6.69 8.38 10.52 12.31 15.01 17.48 20.86 24.33 29.45 35.39 41.76 47.98 56.58 63.40 7O.86 77.49 85.O8 92.49 100.00 108.73 119.07 130.34 MWD Magnetic 26 January, 2001 - ~:~7 Page 2 of 8 Dr#/Quest 2.00.06 Sperry-Sun Drilling Services Survey Report for Z-'lO1 Your Ref: APl 500292297800 Surveyed: 4 January, 2001 North Slope Alaska Measured Depth (ft) Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 1134.70 21.840 330.450 1036.59 1118.39 1166.64 22.420 331.000 1066.18 1147.98 1202.05 24.500 333.250 1098.66 1180.46 1229.33 25.970 333.930 1123.34 1205.14 1260.97 26.620 334.220 1151.70 1233.50 1289.73 27.900 333.060 1177.27 1259.07 1320.68 28.900 330.310 1204.49 1286.29 1351.27 29.170 329.310 1231.24 1313.04 1382.37 30.260 328.480 1258.25 1340.05 1413.26 30.400 327.750 1284.91 1366.71 1446.92 30.510 326.150 1313.93 1395.73 1480.96 31.430 326.100 1343.11 1424.91 1511.04 31.290 325.550 1368.80 1450.60 1542.90 31.160 326.200 1396.04 1477.84 1574.27 31.760 326.880 1422.80 1504.60 1605.66 32.170 327.700 1449.43 1531.23 1636.45 33.010 327.380 1475.38 1557.18 1665.45 34.020 328.370 1499.55 1581.35 1695.44 34.290 328.410 1524.37 1606.17 1729.59 34.160 328.660 1552.61 1634.41 1761.57 35.600 327.850 1578.84 1660.64 1793.48 37.910 327.550 1604.41 1686.21 1823.16 40.300 327.250 1627.44 1709.24 1856.79 41.190 327.380 1652.92 1734.72 1917.05 40.180 327.620 1698.61 1780.41 2008.69 41.120 327.610 1768.14 1849.94 2102.94 44.630 326.950 1837.20 1919.00 2197.22 47.910 328.690 1902.36 1984.16 2292.09 50.240 326.720 1964.51 2046.31 2384.76 53.860 325.480 2021.49 2103.29 122.91N 68.09W 133.40 N 73.97W 145.87 N 80.55W 156.28 N 85.72W 168.89 N 91.85W Global Coordinates Dogleg Northings Easfings Rate (ft) (ft) (°/100ft) 5959481.85 N 599589.57 E 5959492.27 N 599583.55 E 5959504.65 N 599576.80 E 5959514.99 N 599571.50 E 5959527.52 N 599565.20 E 180.69 N 97.70W 5959539.24 N 599559.19 E 193.65 N 104.68W 5959552.10 N 599552.04 E 206.48 N 112.15W 5959564.83 N 599544.40 E 219.68 N 120.11W 5959577.92 N 599536.26 E 232.92 N 128.35W 5959591.06 N 599527.85 E 247.22 N 137.66W 5959605.23 N 599518.36 E 261.76 N 147.42W 5959619.64 N 599508.40 E 274.71N 156.21W 5959632.48 N 599499.44E 288.39 N 165.48W 5959646.03 N 599489.99 E 302.04 N 174.51W 5959659.56 N 599480.78 E 316.03 N 183.49W 5959673.43 N 599471.62 E 330.02 N 192.39W 5959687.30 N 599462.53 E 343.58 N 200.90W 5959700.75 N 599453.84 E 357.92 N 209.73W 5959714.97 N 599444.83 E 374.30 N 219.75W 5959731.22 N 599434.58 E 389.85 N 229.37W 5959746.64 N 599424.76 E 405.99 N 239.58W 5959762.64 N 599414.34 E 421.76 N 249.66W 5959778.27 N 599404.04 E 440.24 N 261.52W 5959796.59 N 599391.95 E 473.37 N 282.63W 5959829.44 N 599370.40 E 523.78 N 314.60W 5959879.42 N 599337.76 E 577.71 N 349.27W 5959932.89 N 599302.38 E 635.38 N 385.52W 5959990.07 N 599265.37 E 695.95 N 423.83W 5960050.13 N 599226.26 E 756.58 N 464.59W 5960110.21 N 599184.69 E 3.23 1.93 6.39 5.49 2.09 4.82 5.32 1.82 3.75 1.28 2.43 2.70 1.06 1.13 2.22 1.90 2.78 3.96 0.90 0.56 4.73 7.26 8.08 2.66 1.70 1.03 3.75 3.73 2.91 4.05 Alaska Drilling & Wells PBU WOA Z Pad Vertical Section Comment 140.40 152.43 166.50 178.09 192.05 205.17 219.87 234.71 250.13 265.73 282.78 300.27 315.91 332.40 348.76 365.37 381.95 397.96 414.80 434.00 452.29 471.38 490.09 512.04 551.31 610.99 675.09 743.19 814.84 887.82 26 January, 2001 - ~:~7 Page 3 of 8 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for Z-lOl Your Ref: AP1500292297800 Surveyed: 4 January, 200~ North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 2478.11 58.530 325.180 2073.41 2155.21 2571.82 58.930 322.600 2122.06 2203.86 2664.64 58.210 322.200 2170.46 2252.26 2757.87 57.230 321.990 2220.25 2302.05 2849.96 57.150 324.050 2270.15 2351.95 2943.88 56.840 326.070 2321.32 2403.12 3037.21 57.560 325.830 2371.88 2453.68 3131.29 58.440 327.170 2421.73 2503.53 3222.72 58.690 327.300 2469.41 2551.21 3320.60 58.370 325.820 2520.52 2602.32 3410.12 58.730 325.810 2567.22 2649.02 3502.84 58.880 326.120 2615.25 2697.05 3597.00 59.040 326.950 2663.80 2745.60 3690.93 59.040 326.500 2712.12 2793.92 3786.27 58.730 325.250 2761.39 2843.19 3878.07 58.180 323.730 2809.42 2891.22 3971.40 58.690 324.120 2858.27 2940.07 4064.17 58.640 323.980 2906.52 2988.32 4157.21 58.390 323.290 2955.11 3036.91 4245.47 58.000 323.400 3001.63 3083.43 4337.71 58.120 322.970 3050.42 3132.22 4433.49 58.850 324.140 3100.49 3182.29 4524.37 58.930 324.470 3147.45 3229.25 4617.86 56.230 326.950 3197.57 3279.37 4711.75 55.780 328.430 3250.07 3331.87 4805.00 57.880 327.780 3301.09 3382.89 4897.93 55.660 328.580 3352.01 3433.81 4989.88 57.330 331.720 3402.77 3484.57 5083.23 58.240 331.560 3452.54 3534.34 5177.04 58.480 331.650 3501.75 3583.55 Global Coordinates Northings Eastings (ft) (ft) 820.35 N 508.71W 5960173.40 N 599139.74 E 885.05 N 555.91W 5960237.46 N 599091.68 E 947.80 N 604.23W 5960299.57 N 599042.53 E 1009.99 N 652.66W 5960361.11 N 598993.29 E 1071.82 N 699.21W 5960422.31N 598945.92 E 1136.38 N 744.32W 5960486.27 N 598899.96 E 1201.38 N 788.24W 5960550.68 N 598855.17 E 1267.91N 832.28W 5960616.62 N 598810.26 E 1333.51 N 874.49W 5960681.65 N 598767.18 E 1403.17 N 920.50W 5960750.70 N 598720.26 E 1466.34 N 963.40W 5960813.30 N 598676.51E 1532.07 N 1007.80W 5960878.43 N 598631.26 E 1599.37 N 1052.28W 5960945.14 N 598585.88 E 1666.71N 1096.48W 5961011.89 N 598540.80 E 1734.28 N 1142.26W 5961078.84 N 598494.12 E 1797.96 N 1187.70W 5961141.92 N 598447.84 E 1862.24N 1234.53W 5961205.56 N 598400.17 E 1926.38 N 1281.05W 5961269.09 N 598352.80 E 1990.27 N 1328.09W 5961332.35 N 598304.92 E 2050.45 N 1372.87W 5961391.92 N 598259.34 E 2113.11 N 1419.77W 5961453.96 N 598211.61 E 2178.80 N 1468.27W 5961518.99 N 598162.24 E 2241.99 N 1513.67W 5961581.58 N 598116.01E 2307.16 N 1558.15W 5961646.16 N 598070.68 E 2372.95 N 1599.75W 5961711.38 N 598028.20 E 2439.21 N 1641.00W 5961777.09 N 597986.08 E 2505.25 N 1681.98W 5961842.59 N 597944.22 E 2571.75 N 1720.12W 5961908.57 N 597905.21E 2641.25 N 1757.64W 5961977.56 N 597866.77 E 2711.50 N 1795.62W 5962047.31 N 597827.86 E Dogleg Rate (o/.~ooff) 5.01 2.39 0.86 1.07 1.88 1.83 0.80 1.53 0.30 1.33 0.40 0.33 0.77 0.41 1.17 1.53 0.65 0.14 0.69 0.45 0.42 1.29 0.32 3.65 1.39 2.33 2.50 3.38 0.99 0.27 Alaska Drilling & Wells PBU WOA Z Pad Vertical Section Comment 965.22 1045.01 1123.72 1201.99 1278.99 1357.58 1435.93 1515.64 1593.63 1677.04 1753.30 1832.52 1913.13 1993.62 2075.14 2153.15 2232.38 2311.34 2390.36 2465.02 2542.92 2624.22 2701.79 2780.58 2858.40 2936.44 3014.17 3090.80 3169.68 3249.45 26 January, 200ri- 11:17 Page 4 of 8 DriilQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for Z-lO1 Your Ref: AP1 500292297800 Surveyed: 4 January, 200~ North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 5269.26 58.580 331.560 3549.89 3631.69 5362.55 58.640 330.850 3598.48 3680.28 5456.27 58.800 330.480 3647.15 3728.95 5549.32 58.470 330.270 3695.58 3777.38 5644.06 58.820 330.540 3744.87 3826.67 5737.17 59.620 329.030 3792.52 3874.32 5830.91 59.510 330.090 3840.01 3921.81 5922.54 59.060 330.240 3886.81 3968.61 6014.42 59.050 330.480 3934.06 4015.86 6108.16 59.510 328.960 3981.95 4063.75 6200.79 60.110 329.830 4028.53 4110.33 6295.52 58.880 329.640 4076.61 4158.41 6389.45 58.640 328.510 4125.33 4207.13 6483.76 57.180 327.840 4175.43 4257.23 6573.67 54.330 328.370 4226.02 4307.82 6669.73 51.040 329.560 4284.24 4366.04 6761.77 49.890 329.430 4342.83 4424.63 6856.04 47.900 330.030 4404.80 4486.60 6948.70 45.880 330.360 4468.13 4549.93 7042.36 42.920 329.710 4535.04 4616.84 7135.47 37.490 329.640 4606.12 4687.92 7229.12 35.860 329.110 4681.23 4763.03 7321.88 36.420 328.120 4756.14 4837.94 7417.20 36.410 328.000 4832.85 4914.65 7508.60 36.440 328.380 4906.39 4988.19 7600.58 36.380 327.360 4980.42 5062.22 7694.98 36.370 326.620 5056.42 5138.22 7788.49 36.410 326.480 5131.70 5213.50 7880.41 36.540 325.840 5205.61 5287.41 7972.96 36.530 325.390 5279.98 5361.78 Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/100ft) 2780.70 N 1833.02W 5962116.00 N 597789.55 E 2850.48 N 1871.38W 5962185.28 N 597750.26 E 2920.31N 1910.62W 5962254.58 N 597710.10 E 2989.38 N 1949.89W 5962323.12 N 597669.91E 3059.73 N 1989.85W 5962392.93 N 597629.03 E 3128.85 N 2030.11W 5962461.51 N 597587.86 E 3198.53 N 2071.06W 5962530.64 N 597545.99 E 3266.86 N 2110.25W 5962598.45 N 597505.90 E 3335.35 N 2149.22W 5962666.42 N 597466.02 E 3404.94 N 2189.85W 5962735.46 N 597424.47 E 3473.85 N 2230.61W 5962803.83 N 597382.80 E 3544.34 N 2271.75W 5962873.77 N 597340.73 E 3613.24 N 2313.02W 5962942.11 N 597298.55 E 3681.12 N 2355.15W 5963009.43 N 597255.52 E 3744.22 N 2394.42W 5963071.99 N 597215.42 E 3809.66 N 2433.81W 5963136.91N 597175.16 E 3870.82 N 2469.84W 5963197.58 N 597138.32 E 3932.16 N 2505.65W 5963258.44 N 597101.70 E 3990.85 N 2539.28W 5963316.69 N 597067.30 E 4047.62 N 2572.00W 5963373.02 N 597033.83 E 4099.48 N 2602.33W 5963424.47 N 597002.81 E 4147.62 N 2630.82W 5963472.22 N 596973.69 E 4194.32 N 2659.31W 5963518.54 N 596944.58 E 4242.33 N 2689.25W 5963566.16 N 596914.01 E 4288.45 N 2717.85W 5963611.89 N 596884.80 E 4334.68 N 2746.89W 5963657.74 N 596855.15 E 4381.63 N 2777.39W 5963704.28 N 596824.03 E 4427.92 N 2807.97W 5963750.15 N 596792.84E 4473.31N 2838.40W 5963795.13 N 596761.81E 4518.78 N 2869.51W 5963840.19 N 596730.10 E 0.14 0.65 0.38 0.40 0.44 1.64 0.98 0.51 . 0.22 1.48 1.04 1.31 1.06 1.66 3.21 3.56 1.25 2.16 2.20 3.20 5.83 1.77 0.87 0.08 0.25 0.66 0.47 .0.10 0.44 0.29 Alaska Drilling & Wells PBU WOA Z Pad Vertical Section Comment 3328.02 3407.58 3487.64 3567.06 3647.93 3727.91 38O8.73 3887.48 3966.26 4046.83 4126.89 4208.49 4288.80 4368.69 4443.00 4519.39 4590.37 4661.39 4729.01 4794.52 4854.59 4910.52 4965.23 5021.81 5O76.O7 5130.66 5186.62 5242.05 5296.63 5351.64 26 January, 200~ - ~1:~7 Page 5 of 8 DriilQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for Z-lO1 Your Ref: APl 500292297800 Surveyed: 4 January, 200~ North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 8064.86 36.300 325.450 5353.93 5435.73 4563.69 N 2900.47 W 8158.44 35.920 323.730 5429.54 5511.34 4608.64 N 2932.42 W 8251.05 35.550 323.440 5504.71 5586.51 4652.17 N 2964.53 W 8345.99 35.250 321.990 5582.10 5663.90 4695.92 N 2997.84 W 8439.85 34.830 322.560 5658.95 5740.75 4738.54 N 3030.82 W Global Coordinates Dogleg Northings Easfings Rate (ft) (f't) (°/~OOft) 5963884.69 N 596698.54 E 5963929.21N 596666.00 E 5963972.30 N 596633.32 E 5964015.61N 596599.43 E 5964057.80 N 596565.89 E 8532.93 34.160 321.940 5735.66 5817.46 4780.23 N 3063.09W 8626.59 33.420 322.490 5813.50 5895.30 4821.39 N 3095.00W 8720.07 32.200 321.580 5892.07 5973.87 4861.33 N 3126.16W 8814.04 31.980 321.540 5971.68 6053.48 4900.43 N 3157.19W 8907.15 31.480 321.100 6050.87 6132.67 4938.66 N 3187.80W 5964099.05 N 596533.07 E 5964139.78 N 596500.61E 5964179.30 N 596468.93 E 5964217.99 N 596437.38 E 5964255.81 N 596406.27 E 9000.36 31.660 320.400 6130.29 6212.09 4976.44N 3218.67W 9093.29 31.620 320.180 6209.41 6291.21 5013.95 N 3249.82W 9187.86 31.860 320.730 6289.83 6371.63 5052.31N 3281.49W 9281.30 31.630 320.930 6369.29 6451.09 5090.42 N 3312.54W 9373.94 31.700 318.960 6448.14 6529.94 5127.64 N 3343.84W 5964293.18 N 596374.90 E 5964330.27 N 596343.26 E 5964368.21 N 596311.08 E 5964405.91N 596279.52 E 5964442.71N 596247.74 E 9468.30 31.820 321.250 6528.38 6610.18 5165.74 N 3375.69W 9561.24 32.350 320.520 6607.12 6688.92 5204.05 N 3406.83W 9654.39 32.010 320.540 6685.96 6767.76 5242.34N 3438.37W 9749.97 29.160 320.780 6768.24 6850.04 5279.95 N 3469.20W 9843.52 26.700 320.520 6850.88 6932.68 5313.83 N 3496.97W 5964480.38 N 596215.39 E 5964518.27 N 596183.74 E 5964556.14 N 596151.69 E 5964593.34 N 596120.37 E 5964626.85 N 596092.14 E 9893.99 25.410 320.480 6896.22 6978.02 5330.94 N 3511.08W 9950.00 25.410 320.480 6946.82 7028.62 5349.48 N 3526.37W 5964643.77 N 596077.82 E 5964662.10 N 596062.28 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well and calculated along an Azimuth of 328.820° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 9950.00ft., The Bottom Hole Displacement is 6407.20ft., in the Direction of 326.607° (True). 0.25 1.16 0.44 0.94 0.57 0.81 0.85 1.41 0.24 0.59 0.44 0.13 0.40 0.27 1.12 1.28 0.71 0.37 2.98 2.63 2.56 0.00 Alaska Drilling & Wells PBU WOA Z Pad Vertical Section Comment 5406.10 5461.10 5514.96 5569.64 5623.18 5675.55 5727.29 5777.59 5827.11 5875.66 5923.97 5972.18 6021.40 6070.09 6118.13 6167.22 6216.11 6265.20 6313.34 6356.71 6378.64 6402.42 Projected Survey 26 January, 2001 - ~I:~7 Page 6 of 8 DriilQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for Z-'lO1 Your Ref: AP1500292297800 Surveyed: 4 January, 2001 North Slope Alaska Alaska Drilling & Wells PBU WOA Z Pad Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 9950.00 7028.62 5349.48 N 3526.37W Comment Projected Survey Survey tool program for Z-IOI From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0.00 9950.00 7028.62 Survey Tool Description MWD Magnetic 26 January, 2001 - ~ ~: ~ 7 Page 7 of 8 DrillQuest 2.00.06 PETROLEllX SERVICES Core Laboratories - Alaska From: Core Laboratories 600 W. SSth Ave., Unit D Anchorage, ..Alaska 99518 Well Name: B.P. Exploration Z-101 ":' .':" Number of Samples: 115 ; , Contact: Philip Cervany ,,, , , ,, [ · Description of Material: Core Chip Samples To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 9537-9657 * · No Samples for 9575,9576,9635,9636 Corn Break Received By: Tim Lawlor Core Laboratories ALASKA OIL AND GAS CONSERVATION CO~IMISSION TONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Dan Stone Senior Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 R.e~ Prudhoe Bay Unit Z- 101 BP Exploration (Alaska), Inc. Permit No: 200-162 Sur Loc: 722' SNL, 1938' EWL, Sec. 19, T11N, R12E, UM Btmhole Loc. 540' SNL, 1366' WEL, Sec. 13, T11N, R11E, UM 'Dear Mr. Stone: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BoPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Daniel T. Seamou , . Commissioner BY ORDER OF THE COMMISSION DATED this ~ day of November, 2000 lit/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Depamnent of Enviromnental Conservation w/o encl. STATE OF ALASKA ALASI~I )IL AND GAS CONSERVATION COIV('~ 3SION PERMIT TO DRILL 20 AAC 25.005 [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work ~ Drill [] Reddll lb. Type of well [] Service [] Development Gas [] Single Zone Re-Entry [] Deepen [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB -- 84' Prudhoe Bay Field/-,~ 3. Address 6. Property Designation Rivcr P.O. Box 196612, Anchorage, Alaska 99519-6612 OZ~ ADL 028245 ~r~' 4. Location of well at surface 7. Un~ or Property Name 11. Type Bond (See 2O AAC 25.0~5) 722' SNL, 1938' EWL, SEC. 19, T11N, R12E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 664' SNL, 1333' WEL, SEC. 13, T11N, R11E, UM Z-101 Number 2S100302630-277 , At total depth 9. Approximate spud date 540' SNL, 1366' WEL, SEC. 13, T11 N, R11E, UM 11/10/00 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028262, 1366' MDI Z-26 is 92' away at 700' MD 2560 10092' MD / 7049' 'i'VD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 250' MD Maximum Hole Angle 58.8 o Maximum surface 2741 psig, At total depth (TVD) 6591' / 3400 psig .... 18. Casing Program l Specifications Setting Depth Size MD TOPTvD! Bottom Quantity of Ce. ment Hole Casing Weight Grade Coupling Len,qth MD TVD (include sta,qe data) 30" 20" 91.5# H-40 Weld 80' Surface I Surface 110' 110' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC 4345' 30' 30' 4375' 3129' 804 sx Articset Lite 3, 315 sx 'G' 8-3/4" 7" 29# L-80 BTC-M 10062' 30' 30' 10092' 7049' ~433 sx Class 'G' , 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production Liner 0 RIG IN A L oc' o::,,, Perforation depth: measured Alaska ()ii & ¢:~.:;. C.0:~s. C,~:rarr.,iss'i0r~ Ai-~ch0~age true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Bill Isaacson, 564-5521 Prepared By Name/Number: Sondra Stewrnan, 564-4750 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed DanStone ~.,~_. ".r"¢3.~ Title Senior Drilling Engineer Date 'Permit:::':'L';~'":"'"':"'""'::":'":": 'i" .".'. "::;:; :.':;::!:'"~..' ¢., '_..I~r- mu/""";"l"Nu'-Je'r '_ ___' '_']."" ' ' '"'" ' I "~ pi a~,uu';p'--o,v~'l";"~-t'~" '""Ii se~ ~oVer letter ' Num"' ~' ' ' ..)-~ i'::.:" i:::..:..; !::i::',.' .,,'..'.'.:? ~.:~'.; '.. "i':::::; "::' '":': :;':" "';i.::"~ ': .:' ::"::~: "?; '.':".:!;': i."i'"":"""!~b~ ~i.[~i6il':':;U se"~'Oii"l~i,:;,,::.: ':; i. ': ..i.. ?.,.'; :: ".;.:.!!:' !i ':: .'".i;:';:. i 'i;:;',.i 'i:::' i.';!"?,"., i':: ":' ".':' !':': 'i :ii..:: :': i?.':'":'"? :'.'] i.:..'"::' i.:.', i' ! :'?'''' .' '?' i;':"]': ':. !'' ". "' :" '"': ":' /~/-~-50- 02.-'~'.- ,Z-.,~¢'7~:~- O(U I '1t/c~/0'0 I for other requirements Conditions of Approval: Samples Required [] Yes ~'No Mud Log Required [] Yes 121' No Hydrogen Sulfide Measures [] Yes Ij~].No Directional Survey Required ~ Yes [] No Required Working Pressure for BOPE1~I2K [] 3K [] 4K [] 5K [] 10K [] 15K ~3.5K psi Other: by order of Approved By Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate From: Tom Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Friday, October 13, 2000 4:17 PM To: Bill Isaacson Cc: Bob Crandall; Steve Davies Subject: [Fwd: [Fwd: Z- 101 Intermediate Cementing]] Bill, For your info, here is Bob Crandall's reply to the shallow oil. As I said before, you guys did your homework. Based on the fault interpretation out there, your block does look to be wet in the "shallows". We will all have to be mindful of how broken up the geology is out West and that it is possible that this zone will have oil in it in other fault blocks. If you have any questions, please call. Tom Maunder Subject: Date: From: To: Re: [Fwd: Z- 101 Intermediate Cementing] Fri, 13 Oct 2000 19:22:23 -0000 Robert Crandall <Bob_Crandall~admin.state.ak.us> Tom Maunder <tom_maunder~admin.state.ak.us> This is an interesting situation because it's typical for Kuparuk, West Sak, Ugnu and Sagavanirktok pay in the Western Prudhoe Bay and Eastern Kuparuk River Units. Large volumes ofbiodegraded oil in the mid twenty to mid teen api range are present in fault controlled accumulations throughout this area. Taken together this fairway holds billions of barrels. Problems related to complex pay distribution, high viscosity oil and low reservoir temperatures will strongly affect ultimate recovery here but even so we've had recent estimates of up 400 PBU wells being drilled from 4 new pads and existing infrastructure in this trend. In this case Tom was looking at a Z-pad Kuparuk River pool (fault separated from the S-pad Kupamk River pool?) well design. We checked an adjacent expl. well (Highland St.) and found lots of oil in the West Sak, a little in the Ugnu and a big fat oil sand in the Sagavanirktok (@ 3200' md) The Sag oil is probably cold and thick but we have always treated these a potential resource, even though the operators frequently object. This well was less than a mile from Z-pad. Wells on Z-pad have oil in only a few West Sak sands and the overlying section is wet. This is an interesting area and is one we need to pay attention to. Tom Maunder wrote: Bob, Here is the note from Bill Isaacson regarding their finding of no hydrocarbon in the Ugnu. Tom > > > > > > > > > > > > > > > > > > > > Subject: Re: Z-101 Intermediate Cementing Date: Fri, 13 Oct 2000 08:56:03 -0800 From: Tom Maunder <tom_maunder~admin.state.ak.us> To: "Isaacson, William S" <IsaacsWS@bp.com> References: <D585E208DC48D0119FEA0000F8023FD7028CB057~AMANCX3> Bill, Thanks for this information, I will get with Bob Crandall on it. It looks like you have done your upfront work and I don't think there will be anything further necessary. One item I will need to add to the package is the postable hazards note. You can get with Allen for an example. The section you have in the package you prepared is good, but we do like to see a bullet type that can be posted in the doghouse. You can send it by email and I will add it to the package. Thanks again, give a call if you have any questions. Tom "Isaacson, William S" wrote: > > > > Tom, This note is to confirm our conversation of Wednesday October 11, 2000, regarding intermediate casing cementing requirements on the Z-101 well. As we discussed, the need to bring cement above the Ugnu reservoir section, because of producible hydrocarbons, should not be required. This issue was researched thoroughly in the well planning process because of the hydrocarbons encountered while drilling the Ugnu intervals in the recent Aurora S-Pad wells. Several wells in the Z-Pad area with logs across the Ugnu intervals were reviewed. Those wells which originated from Z-Pad (Z-35, Z-08, & Z-03) show no signs of producible hydrocarbons from the Ugnu intervals. As per the Gologists and Reservoir Engineers, the Ugnu in this area is wet and believed to be down in the water aquifer. In regards to your questions of the hydrocarbons found within the Ugnu interval at-3200' TVDss in the offset well 'Highland State'. It is believed that there is a large fault between the Z-Pad Ugnu penetrations and the Highland State Ugnu penetration. The interval you reference in the 'Highland State' well at -~3200' TVDss, is found approximately 230' TVD deeper in the Z-Pad and planned Z- 101 penetrations, thus placing them down in the water aquifer. Therefore, as per the proposed cementing design submitted in the Z-101 Permit to Drill, we will plan to bring cement ~-500' above the Schrader interval and leave the Ugnu uncovered. If further information is required to meet your approval of the proposed plan, please contact me and I can do what we need to do. Thanks!! William S. Isaacson Alaska Drilling & Wells Phone: (907) 564-5521 Fax: (907) 564-4040 E-mail: IsaacsWS~BP.com Tom Maunder <tom_rnaunder~admin.state.ak.us> Petroleum Engineer Alaska Oil and Gas Conservation Commission Tom Maunder > Petroleum Engineer <tom_rnaunder@admin.state.ak.us> > Alaska Oil and Gas Conservation Commission > 3001 Porcupine Dr. > Anchorage > AK > 99501 > USA > Additional Information: > Last Name Maunder > First Name Tom > Version 2.1 Fax: 907 276-7542 Work: 907 793-1250 Conference Software Address > > > Tom Maunder <tom_rnaunder@admin.state.ak.us> Petroleum Engineer Alaska Oil and Gas Conservation Commission Tom Maunder Petroleum Engineer <tom_maunder@admin. state, ak. us> > Alaska Oil and Gas Conservation Commission > 3001 Porcupine Dr. > Anchorage > AK > 99501 > USA > Additional Information: > Last Name Maunder > First Name Tom > Version 2.1 Fax: 907 276-7542 Work: 907 793-1250 Conference Software Address Z-101 Permit to Drill I Well Name: 1 Z-101 Drill, Core, and Complete Plan Summary I Type of R~rill (producer or injector): I Producer Surface Location: x = 599,659 / Y = 5,959,360 722'FNL 1938'FWL S19TllNR12E Umiat Target Location: x = 596,318 / Y = 5,964,654 664'FNL 1333'FEL S13TllNR11E Umiat Bottom Hole Location: x = 596,283 / Y = 5,964,778 540' FNL 1366' FEL S13T11N R11E Umiat I AFENumber: 15M4003 I Estimated Start Date:I 1 1/10/00 I MD: I~ 0,0~z I I ~VD.' I ~0~' I Rig: I Nabors7ES I Operating days to complete: 124 I BF/MSL: 155.2' I RKB: 1 84.0' I Well Design (conventional, slimhole, etc.)' I Ultra-Slimhole I Objective: I Development appraisal well for Northwest Eileen Kuparuk Structure RECEIVED OCT 0 Mud Program: A!aska 0ii & ,'.:,.,: .:,'. Co,%. C0mmissiorl Ancho~'age Surface Hole Mud Properties: Fresh Water Spud 12-1/4" Hole Section From Surface to -4375' MD'/3129' TVD (-230' TVD below top SVl). Interval Density (ppg) Viscosity YP LSR YP Gel APl FL (seconds) 10 sec Initial 9.4 to 9.8 250 - 300 50 - 70 30 - 40 35 - 55 12 - 15 SV3 10.2 150-200 50 - 30 18 - 11 20 - 35 6 - 8 Interval TD 10.2 75-100 20 - 35 8 - 15 20 - 35 6 - 8 Production Hole Mud Properties' LSND / 6% KCl 8-3/4" Hole Section APl FL LSND Mud System From Surface Casing Shoe to 9200' MD / 6206' TVD (-200' MD above top HRZ). 9.0 to 9.8 I 45 - 55 23 - 28 10 - 17 3 - 7 9 - 9.5 <10 to 6 Open Hole Displacement to 6% KCl/Polymer Coring Fluid From 9200' MD / 6206' TVD to interval TD. 10.2 to 10.3 18 - 23 13 - 15 3 - 7 9 - 9.5 +/-10 40 - 50 Z-101 Permit to Drill Directional: KOP: I 250' MD Maximum Hole Angle: Close Approach Well: Surface - 58.8° In Tangent Interval 2417' to 4375' MD Production - 58.8° In Tangent Interval 4375' to 6989' MD All wells pass BP Close Approach guidelines. The nearest close approach well is Z-26, which is 91.5' well-to-well at 700' MD. Survey Program: Standard MWD Surveys from surface to TD. No gyros will be needed for surface kick-off. Logging Program: Surface Hole Section Production Hole Section Drilling: MWD / GR Open Hole: None Cased Hole: None Drilling: Open Hole: Cased Hole: MWD ! GR / Resistivity GR / Res ! Den / Neu (across Schrader & Kuparuk) CMR / Sonic (across Schrader & Kuparuk) RFT (Pressures in Schrader & Kuparuk, fluid samples in Kuparuk only) Percussion SWC's (From Schrader Bluff interval only) None RECEIVED Formation Markers' · OC,T Formation Tops MD TVDss Comments '~" ~ '" .......... '~' Base Permafrost 1914' 1700' ~,,,,,~,.,, ~ ~ ~..-...~,~.~ ¢"i",r~'~,~ ~";,[--~t..~l~-r[[iS~('~i~)n SV3 / T5 2648' 2149' ,-~,,,o,~,, .... ~.n~.hr~'a0e SV2 / T4 3251' 2462' SVl / T3 3933' 2816' -- UG4 / K15-C1 4666' 3196' Est. pore pressure 1500 psi (9.0 ppg EMW) .... UG3 5348' 3550' UG1 / UgS 6143' 3962' WS2 6755' 4280' Est. pore pressure 2000 psi (9.o ppg EMW) WSl / West Sak 7165' 4497' Est. pore pressure 2105 psi (9.o ppg EMW) CM3 / K-12 7580' 4757' CM2 / K-10 8123' 5161' CM-1 / K5 5798' K2/Top HRZ 9403' 6314' Top Kuparuk 9696' 6591' Est. pore pressure 3400 psi (9.9 ppg EMW) Miluveach 9891' 6776' Top Kingak (JG) Not Penetrated Sag River Not Penetrated Shublik Not Penetrated Top Sadlerochit / Z4B Not Penetrated Top Z4A Not Penetrated Maximum TVDss Not Penetrated T41 N Not Penetrated HOT Not Penetrated OOWC Not Penetrated Z-101 Permit to Drill Casin I/Tubinq Proqram: ~1w ~ V Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 12-1/4" 9-5/8" 40# L-80 BTC 4345' 30'/30' 4375'/3129' 8-3/4" 7" 29# L-80 BTC-M . 10,062' 30'/30' 10,092'/7049' Tubing 3-1/2" 9.3# L-80 8rd-Mod 9,517' -28'/28' 9545'/6532' Cement Calculations: The following cement calculations are based upon a two stage job using a stage tool. If a port collar is run rather than a stage tool, circulating cement to surface will be attempted using a sin. gle stage job. Cement volumes under this scenario will be as follows: Lead - as noted for both 1st and 2no stage. Tail - as noted below for 1st stage. Casing Size I 9-5/8" Surface - 1s' Stage I Basis: Lead: Based on 1375' of open hole from top of tail slurry to stage collar + 30% excess. Lead TOC: At -2200' MD (1987' TVD), planned set depth of stage tool. Tail: Based on 800' MD (-415' TVD) open hole volume + 30% excess + 80' shoe track volume. Tail TOC: At -3575' MD (2766' TVD). ITotal Cement Volume: Lead I 100 bbl / 562 f¢ / 127 sks of Dowell ARTICSET Lite 3 at 10.7 ppg and 4.44 cf/sk. Tail 65 bbl / 365 f¢ / 315 sks of Dowell Premium 'G' at 15.8 ppg and 1.16 cf/sk. Casing Size I 9-5/8" Surface - 2® Stage Basis: Lead TOC: At surface. Tail: None Tail TOC: N/A Total Cement Volume: Lead: Based on 2200' of open hole from stage collar to surface + 200% excess + 9-5/8" casing capacity from surface to stage tool. Lead Tail 535 bbl/3004 f¢ / 677 sks of Dowell ARTICSET Lite 3 at 10.7 ppg and 4.44 cf/sk. None Casing Size 17'' Production I ...~ v,j~o,¥ c~ k_~-,,,,.~ '~, Basis: Lead: Based on 2450' of open hole (to 500' MD above top Schrader Bluff) with 80% excess. Lead TOC: At -6250' MD (4102' TVD). Tail: Based on 82' shoe track volume and 1395' of open hole (to 1000' MD above top Kuparuk formation) with 35% excess. Tail TOC: At -8700' MD (5740' ITotalcementvolume: I Lead I TVD). 118 bbl / 663 f¢ / 174 sks of Dowell Premium 'G' at 11.0 ppg and 3.82 cf/sk. 54 bbl / 303 f¢ / 259 sks of Dowell Premium 'G' at 15.8 ppg and 1.17 cf/sk. ., Z-101 Permit to Drill Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon calculations below BOP equipment will be tested to 3500 psi. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate/Production Section- . Maximum anticipated BHP: 2000 psi @ 4280' TVDss - West Sak · Maximum surface pressure: 1572 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) Maximum anticipated BHP: 3400 psi @ 6591' TVDss - Kuparuk Maximum surface pressure: 2741 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: · Planned completion fluid: 3500 psi 8.7 ppg 6% KCl / 6.8 ppg Diesel Drilling Hazards/Contingencies: HYDROGEN SULFIDE - H2S · Z Pad is not designated as an H2S drill site, however Standard Operating Procedures for H2S precautions should be followed at all times. The highest level of H2S ever measured on Z Pad has been 21 ppm from Z-18. DRILLING CLOSE APPROACH: · All wells pass close approach guidelines. SURFACE HOLE SECTION: · Z Pad has a history of gas hydrate problems while drilling both the surface and intermediate hole sections. On the three most recent Z Pad wells gas hydrate problems were minimized in the surface hole and basically eliminated from the intermediate section. By setting the surface casing deeper, down below the SV1 sands rather than above the SV2 sands, hydrates were eliminated from the intermediate hole. In the surface hole, hydrate gas was minimized by bringing the mud weight to 10.2 ppg by the Base Permafrost and by pretreating the mud system with 2 ppb Driltreat (Lecithin). Additional measures include reducing flow rates to ~450 to 500 gpm and keeping the mud temperature cool. · Minor tight hole has been encountered in the clay sections below the permafrost. · Differential sticking could be problematic in this hole section adjacent to the permeable SV Sands. Avoid leaving drill string stationary for extended periods, tighten fluid loss properties of mud, and string in Barofibre prior to penetrating sand intervals. · Lost circulation has not been a problem while drilling in the surface section, however losses have occurred while running and cementing surface casing. Be sure to condition and thin mud Z-101 Permit to Drill appropriately prior to pulling out of the hole to run casing, and once on bottom with casing, bring circulation up slowly and reduce mud viscosities before pumping cement. INTERMEDIATE / PRODUCTION SECTION: · Gas cut mud has been observed in the Ugnu (3196' TVDss) and West Sak (4280' TVDss) sands. This will be controlled with appropriate mud weights. A minimum of 9.3 ppg is recommended. · The Z-101 well path will drill a full section of the HRZ shale. The HRZ has not proven troublesome in the Z Pad area, however precautions will be taken to aid in shale stabilization. Increased mud weights and inhibitive drilling fluids will be used. · The shallow intervals beneath Z Pad are highly faulted. These faults have a history of being conductive and have resulted in several lost circulation incidents. As planned, the Z-101 well path should not cross any faults and has been optimized to avoid cutting any permeable sands near the damaged zones of these faults. However, the possibility of encountering losses still exists. To be prepared for any potential lost circulation, a copy of the 'Recommended Lost Circulation Procedures' and the 'Lost Circulation Decision Tree' will be sent to the rig prior to drilling out in the 8-3/4" production interval. · Differential sticking will be a problem if lost circulation is occurring or if the drill string is left stationary for an extended period or time across the permeable Schrader Sands. · The kick tolerance for the 8-3/4" open hole section would be 55 bbls assuming an influx from the Kuparuk interval at -9696' MD. This is a worst case scenario based on a 9.9 ppg pore pressure gradient, a fracture gradient of 12.5 ppg at the 9-5/8" shoe, and 10.3 ppg mud in the hole. Disposal: · No annular injection in this well. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I wastes to Pad 3 for disposal. Pre-Ricl Work: 1. Set 20" conductor and weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. RiR Operations: 1. MIRU Nabors 7ES. 2. Nipple up and function test 21-1/4" diverter system. PU 5" DP as required and stand back in derrick. 3. MU 12-1/4" drilling assembly with MWD/GR and directionally drill surface hole to approximately 4375' MD / 3129' TVD. The actual surface hole TD will be +/-230' TVD below the top of the SV1 sands. 4. Run and cement the 9-5/8", 40# surface casing back to surface. A port collar or stage tool will be run in the casing to allow for secondary cementing if cement is not circulated to surface during primary cementing operations. 5. ND diverter system and NU casing / tubing head. NU BOPE and test to 3500 psi. 6. MU 8-3/4" drilling assembly with MWD/GR/Res and RIH to float collar. Test the 9-5/8" casing to 3500 psi for 30 minutes. 7. Drill out shoe joints and displace well to LSND drilling fluid. Drill new formation to 20' below 9-5/8" shoe and perform Leak Off Test. 8. Drill ahead to approximately 200' of the top HRZ and perform openhole mud changeover from LSND to 6% KCI GEM mud system. Short trip as required. 9. Continue to drill ahead to core point at approximately 9694' MD / 6673' TVD (desired core point is within a couple feet of the top Kuparuk in order to capture the transition interval between HRZ and Kuparuk). POOH. 10. Core approximately 180' of 4" full diameter core across the Kuparuk interval. Base plan is to obtain the core with two 90' core barrel runs. 11. MU 8-3/4" drilling assembly with MWD/GR and RIH. Drill -200' of rat hole below the Kuparuk as required for logging. Condition hole for logging and POOH. 12. RU Schlumberger E-line unit. Make two logging runs across both the Kuparuk and Schrader intervals consisting of: #1 - PEX with Micro Resistivity + CMR, #2 - RFT & Compressional Sonic. Make a third logging run to obtain percussion SWC's across the Schrader interval. POOH and RD Schlumberger. 13. RIH with 8-3/4" cleanout assembly and condition hole for running the 7" casing. POOH laying down the 5" DP. 14. Run and cement the 7", 29# production casing as required to cover all significant hydrocarbon intervals. Displace the 7" casing with 6% KCI completion brine during cementing operations and freeze protect the 7" x 9-5/8" annulus as required. 15. Test the 7" casing to 3500 psi for 30 min. 16. Run the 3-1/2", 9.3#, L-80 8rd-Mod gas lift completion assembly. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. 17. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 18. Freeze protect the well to -2200' and secure the well. 19. Rig down and move off. Post-Ric~ Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the new production packer. 2. RU E-line and perforate Kuparuk interval with E-line conveyed guns. 3. Perform fracture stimulation on Kuparuk interval as required. Z-101 Permit to Drill Estimated Pre-rig Start Date: Estimated Spud Date: 11/01/00 11/10/00 William Isaacson Operations Drilling Engineer 564-5521 NWE Z-101 Proposed Completion TREE: 4-1/16" - 5M CIW L-80 WELLHEAD: 11" - 5M FMC G5 9-5/8", 40 #/ft, L-80, BTC I I I L L I ! · '1 Plug Back Depth 110,007'I 7", 29 #/ft, L-80, BTC-Mod Cellar Elevation = 54.0' Nabors 7ES RKB = 84.0' 3-1/2" 'X' Landing Nipple with 2.813" seal bore. I 2200' 3-1/2" x 1-1/2" Camco 'MMG' Gas Lift Mandrels with handling pups installed. GAS LIFT MANDRELS .................... -~i-ze ........... I .... ~l~e~-ryp'e / TBD 1-1/2" [ RP Shear TBD 1-1/2'I / DV TBD 1-1/2' / DV TBD 1-1/2" ~ DV 3-1/2" 9.3# L-80, EUE 8rd-Mod Tubing 3-1/2" 'X' Landing Nipple with 2.813" seal bore. 7" x 3-1/2" Baker 'S-3' Production Packer 3-1/2" 'XN' Landing Nipple with 2.813" seal bore and 2.725" No-Go ID. 3-1/2" WireLine Entry Guide set at +/-9545' (-150' above the Kuparuk Formation). Date 9/19/00 Rev By Comments WSI Proposed Completion NWE WELL: Z-101 APl NO: 50-029-????? BP Alaska Drilling & Wells Shared Services Drilling Dir @ 1.000°/100ft: 250.00ft MD, 250.00ft TVD Dir Rate @ 2.000°/100ft: 450.00ft MD, 449.96ft TVD in Dir Rate @ 2.500°/100ft: 650.00ft MD, 649.43ft TVD in Dir Rate @ 3.000°/100ft: 850.00ft MD, 847.17ft TVD 1250 Z-101 Wp 04 End Dir: 1842.42fl TVD Dir @ : 1942.42ft MD 1805.73ft TVD .41.f.LMD, .!879.7_1.ft.T_VD ....................................... Dir: 2416.96ft MD, 2113.42ft TVD ~ ~-;.~.~ I DrillQuest' Proposal Data for Z-101 Wp 04 vertical Origin:Well Horizontal Origin: Well Meas~xement Un~s: 11 North Reference:True North Dogleg severity:Degrees per 100ft Vertical Section Azimuth: 328.823° Vertical Section Descript.~rr Well Vertical Seclion Origin: 0.00 N,O.00 E Measured Incl. Azlm. Vertical Northlngs Eeanng. VerticalDogleg Depth Depth Section Rate o.oo o.ooo 0.76o o.o0 o.m~ N o 1~} F. 0.0o 250.0~ O.C~O O.7~ 2~.1~ I1.~) N O.(X}F. IL(X} 450.~ 2.~ 326.928 ~9.96 2 92 N I.~l W 3.,19 650.~ 6.~ 326.928 ~9.43 14.61 N 9.52 W 17.,13 g50.~ I 1.~ 326.928 ~7.17 39. t8 N 25.~ W 46.97 1~2.42 40.772326.928 17.~} I~ 398.38 N 259.43 W 475.15 1~2.42 40.772326.92g 1805.73 453.11 N 295.~} W g10.42 03~} 2~2.41 43.772326.928 1879.71 ~.47 N 331.76 W ta~1.63 2416.9658.7~ 326.928 2113.42 753.6O N .It~.74 W898.80 4.{~g} 6215.945g.7~ 326.928 4084.(~ M75.32 N 2263.1 I W 4144.96 ~89.01 5g.7~ 326.928 ~85.~1 4029.17 N 2623.78 W.1805,53O.~g~l ~38.62 18.~6 ~.799 ~53.~ 5131.91 N 3214.55 W60~.g4 9685.86lg.~6 ~.7t~ ~5.52 5334.70 N 32~1.65 W6256.86 9~5.88 18.~5 ~.7t~ ~5.~ 5334.71 N 32¢9.65 W6256.87 9695.88Ig.~5 ~.7t~ ~753~ 5~37,84 N 3270.~ W 62593~ 0.{~ 9891_48 Ig.~5 ~.799 &g~).(~l 53~).12 N 3287.15 W6321.(~t(I (~1 1~1.48 18.~5 ~.7~ 71g~9.16 ~61.78 N 331H,Ig W6393,47 25OO · .= 3750 > 5OOO ~ 6250 II ._ ',1-- -- .................. S;-:~' Current Well Properties :.~£3.L0~') Well: Z-101 NewLec SV2 Horizontal Coordinates: 25-:rJ t~) Ref. GIo~al Coordinates: 5959360.00 N, 599659.00 E · -- Ref. Slructu*e Reference : 2151.41 N, 1613.04 W .......... .9.5/_8." .C. _a{l!n_ g ............................................................... Rel. Geographical Coordinates: 70° 17' 542139' N. 149' 11' 34.5052' W 4374.84 MD S?i RKB Elevation: 84.00fl above Mean Sea Level 3129.00 TVD 29(~C.(:0 84.00fl above Slru:ta'e Reference 7'~:0~ ,",:~' ~ ,['' Nodh Reference: True Nodh ..................................................... egin.-Dir @ .2.00Ot/100ft ?~6989.01 ft M D, 4485.00ft TVD .................................................................................................. '~ ......................... ~.i~?'F'"'" I Single Well Target Data for Z-lO, New Loc ~ ;'-~' ~ ~'~ I Target Point TVDrkb TVDiI Ea~Ungl ASP Y ASP X  ,~,- ..: -A,<- Name Type Norlhlng a ~ ........ I Boonda/y Poinl ^ 40X4.O0 4(~10.00.162k32 N 2111.]4 W 5962955 I~1NS,775aXMH} E C 4094.00 40i~1.0~! ~:127.:12 N 2415.f~,~ W 5~,~2655.(~7 N~'~721Xl.IX) Ii \/End Dir: 9038.62ft MD, 6053.34ft TVD 10091.48 MD 7049.1 6 TVD 0 1250 2500 3750 5000 6250 Scale: linch = 1250ft Section Azimuth: 328.823° (True North) Vertical Section Prepared: Checked: ~Approved: Target Shared Services Dri{i,,ng Z-101 Wp 04 I DriHQuesf 1::: o Z 0 C) O0 II .-- 56OO 48OO 4OOO 32OO 24OO 1600 800 Scale: linch = 800ft Eastings -3200 -2400 -1600 -800 0 I I I 7" Casing __ ,,~..~. 10091.48 MD 7049.16 TVD nd Dir: 9038.62ft MD, 6053.34ft TVD 800.00 egin Dir @ 2.000°/100ft· 6989.01ft MD, 4485.00ft TVD -- '~.~ 2oo,oo \ \ ~900.00 11 13oo,oo Slflgie Will Tmrgel Dill for Z-101 NiwLoc ~' ....... "~"'~ " X 9 5/8" Ca$in9 I .... ~"" ..... ~ ................................. ~, 4574.84 ME) !:::::',',:',:: ::::::',: :::::,:',',',', ',::::::: :r,,:,:: :::::::::',::::::,:::',::: i!i. I Well: Z-101 NewLoc i Horizontal Coordinates: '~ oo oo Ret. Global Coordinates: 5959360.00 N, 599659,00 E Ret. Structure Reference : 2151.41 N, 1613.04 W Ret. Geographical Coordinates: 70* 17' 54.2139* N, 149° 11' 34.5052" W RKB Elevation: 84.00ft above Mean Sea Level 84.0C~t above Structure Reference ~' 4oo,oo~4o North Reference: True North Units: Feet End Dir: 2416.96ft MD, 2113.42ft TVD · ease in Dir Rate @ 4.000°/100ft: 2042.41ft MD, 1879.71ft TVD Begin Dir @ 3.000°/100ft: 1942.42ft MD, 1805.73ft TVD ~7oooo End Dir: 1842'42ft MD, 1730'00ft TVD -------- Increase in Dir Rate @ 3.000°/100ft: 850.O0ft MD, 847.17ft TVD Increase in Dir Rate @ 2.500/100ft: 650.00ft MD 649.43ft TVD ~--./ Increase in Dir Rate @ 2.000°/100ft: 450.00ft MD', 449.96ft TVD Begirl Dir @ 1.000°/100ft: 250.00ft MD. 250.00ft TVD" I I I I -3200 -2400 -1600 -800 0 Scale: linch = 800ft Eastings Reference is True North 56OO 4800 4000 32OO 24OO 1600 8OO o Z Prepared: Checked: ~pproved: North Slope Alaska Alaska State Plane 4 PBU_ WOA Z Pad Z- 101 NewLoc - Z- 101 WP04 PROPOSAL ..R ORT 19 September, s.2000 Surface Coordinates: 5959360.00 N~ii:ii!.i-59965§.00 E (70° 17' 54.2139" N, 149° 11' 34.5052" W) Kelly Bushin~,:84;OOfl above Mean Sea Level Proposal Ref: pro 10447 Sperry-Sun Drilling Services Proposal Report for Z- 101 NewLoc - Z- 101 Wp 04 North Slope Alaska Measured Sub-Sea Depth Incl. Azim. Depth (ft) (ft) 0.00 0.000 0.000 -84.00 250.00 0.000 0.000 166.00 300.00 0.500 326.928 216.00 400.00 1.500 326.928 315.98 450.00 2.000 326.928 365.96 500.00 3.000 326.928 600.00 5.000 326.928 650.00 6.000 326.928 700.00 7.250 326.928 800.00 9.750 326.928 850.00 11.000 326.928 415.91 499.91 4.75 N 515.66 599.66 10.60 N 565.43 649.43 14.61N 615.10 713.99 763.17 900.00 12.500 326.928 812.12 1000.00 15.500 326.928 909.14 1100.00 18.500 326.928 1004.76 1200.00 21.500 326.928 1098.72 1300.00 24.500 326.928 1190.76 1400.00 27.500 326.928 1280.63 1500.00 30.500 326.928 1368.08 1600.00 33.500 326.928 1452.88 1700.00 36.500 326.928 1534.78 1800.00 39.500 326.928 1613.57 1842.42 40.772 326.928 1646.00 1900.00 40.772 326.928 1689.61 1913.72 40.772 326.928 1700.00 1942.42 40.772 326.928 1721.73 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 0.00 0.00 N 0.00 E 5959360.00:N' 599659.00 E 250.00 0.00 N 0.00 E 5959360;~ N 599659.00 E 300.00 0.18 N 0.12 W 59.5~60.18 N.:: :..;i :,::... 599658.88 E 399.98 1.65 N 1.07 W :5959361~63 N 599657.91 E 449.96 2.92 N 1.90 W : :59593~.90 N 599657.06 E ::-+i{-':.!~ :<;::i: ::}::':: . 3.09 Hi- ;;!; ~:~;;5959364.71 N 599655.84 E :~:~::~::: .: ~::.:~: .~:~ · .~: 6;90 W N 599651.96 E ?::::;ii??'i':~:'i~ W5959374.49 U 599649.29 E · ,,. W ...... 5959379.28 N 599646.08 E W 5959391.55 N 599637.85 E 699.10 797.99 847.17 39.38i:N? ..... ~.i~. :.i::25.64 W 5959399.03 N 599632.84 E -: ;;~ ~;~ ::. . :..-. :.. 896.12 47.91 N :'.:i :;*31.20 W 5959407.49 N 599627.17 E 993.14 68.18 N 44.40 W 5959427.59 N 599613.70 E 1088.76 92.68 N 60.35 W 5959451.87 N 599597.42 E 1182.72 121.34 N 79.01 W 5959480.28 N 599578.38 E 1274.76 154.07 N 100.33 W 5959512.73 N 599556.63 E 1364.63 190.81 N 124.25 W 5959549.14 N 599532.23 E 1452.08 231.43 N 150.70 W 5959589.41 N 599505.24 E 1536.88 275.83 N 179.62 W 5959633.42 N 599475.74 E 1618.78 323.89 N 210.91 W 5959681.06 N 599443.81 E 1697.57 375.47 N 244.51 W 5959732.20 N 599409.54 E 1730.00 398.38 N 259.43 W 5959754.91 N 599394.31 E 1773.61 429.90 N 279.95 W 5959786.15 N 599373.38 E 1784.00 437.41 N 284.84 W 5959793.59 N 599368.39 E 1805.73 453.11 N 295.06 W 5959809.16 N 599357.95 E Dogleg Rate (°/100ft) 0.000 1.000 1.000 1.000 2.000 2.000 2.000 2.500 2.500 2.500 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 0.000 0.000 0.000 Alaska State Plane 4 PBU_WOA Z Pad Vertical Section (ft) 0.00 0.00 0.22 1.96 3.49 5.67 12.64 17.43 23.19 37.97 46.97 57.14 81.32 110.54 144.72 183.76 227.57 276.02 328.98 386.30 447.82 475.15 512.73 521.69 540.42 Comment Beain Dir @ 1.000°/100ft: 250.00ft MD, 250.00ft TVD Increase in Dir Rate @ 2.000°/100ft · 450.00ft MD, 449.96ft TVD Increase in Dir Rate @ 2.500°/100ft: 650.00ft MD, 649.43ft TVD Increase in Dir Rate @ 3.000°/100ft · 850.00ft MD, 847.17ft TVD End Dir · 1842.42ft MD, 1730.00ft TVD B Perm Beqin Dir @ 3.000°/100ft: 1942.42ft MD, 1805.73ft TVD Continued... 19 September, 2000- 11:27 - 2 - DrillQuest 1.05o05a Sperry-Sun Drilling Services Proposal Report for Z-101 NewLoc - Z-101 Wp 04 North Slope. Alaska Measured Sub-Sea Depth Incl. Azim. Depth (~) (~) 2000.00 42.500 326.928 1764.77 2042.41 43.772 326.928 1795.71 2100.00 46.076 326.928 1836.49 2200.00 50.076 326.928 1903.29 2300.00 54.076 326.928 1964.74 2400.00 58.076 326.928 2020.54 2416.96 58.754 326.928 2029.42 2500.00 58.754 326.928 2072.49 2600.00 58.754 326.928 2124.37 2647.49 58.754 326.928 2149.00 2700.00 58.754 326.928 2176.24 2800.00 58.754 326.928 2228.11 2900.00 58.754 326.928 2279.98 3000.00 58.754 326.928 2331.85 3100.00 58.754 326.928 2383.72 3200.00 58.754 326.928 2435.59 3250.91 58.754 326.928 2462.00 3300.00 58.754 326.928 2487.46 3400.00 58.754 326.928 2539.34 3500.00 58.754 326.928 2591.21 3600.00 58.754 326.928 2643.08 3700.00 58.754 326.928 2694.95 3800.00 58.754 326.928 2746.82 3900.00 58.754 326.928 2798.69 3933.37 58.754 326.928 2816.00 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) · 1848.77 485.17 N 315.94 W 5959840.94 N 599336.65 E ........... 1879.71 509.47 N 331.76 W 59598~02 N 599320.51 E 1920.49 543.54 N 353.95 W 5959898.80 N 599297.87 E .: :: ~::~:~' . 1987.29 2048.74 2104.54 2113.42 2156.49 22O8.37 2233.00 2260.24 2312.11 2363.98 2415.85 2467.72 2519.59 2546.00 2571.46 2623.34 2675.21 2727.08 2778.95 2830.82 2882.69 2900.00 605.88 N 394.55 W : ~59.~:!:59 671.97 N 437.58 W 5960026.11 753.60 N 490.74 .::i 5960107.02 813.09 N ;: 52g:~ W 5960166.00 1099.66 N:.ii:.i:? ........ ~ !i :.:..716.10 W 1171.31 U':~?'~: i'i::iii?i ~: 762.75 W 1242.95 N 809.40 W 5960450.07 5960521.09 5960592.11 1314.59 N 856.06W 5960663.12 1351.06 N 879.81W 5960699.28 1386.24 N 902.71W 5960734.14 1457.88 N 949.36W 5960805.16 1529.52 N 996.02W 5960876.18 1601.17 N 1042.67W 5960947.20 1672.81N 1089.33W 5961018.22 1744.45 N 1135.98W 5961089.24 1816.10 N 1182.63W 5961160.25 1840.00 N 1198.20W 5961183.95 N 599256.45 E N 599212.54 E N 599166.36 E N 599158.31E N 599118.78 E N 599071.18 E N 599048.58 E N 599023.58 E N 598975.98 E N 598928.38 E N 598880.78 E N 598833.18 E N 598785.59 E N 598761.35 E N 598737.99 E N 598690.39 E N 598642.79 E N 598595.19 E N 598547.59 E N 598499.99 E N 598452.39 E N 598436.50 E Dogleg Rate (°/100ft) 3.000 3.000 4.000 4.000 4.000 4.000 4.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Alaska State Plane 4 PBU_WOA Z Pad Vertical Section (fi) 578.65 607.63 648.28 722.62 801.45 884.36 898.80 969.76 1055.21 1095.79 1140.65 1226.10 1311.55 1397.00 1482.45 1567.90 1611.40 1653.34 1738.79 1824.24 1909.69 1995.14 2O80.58 2166.03 2194.54 Comment Increase in Dir Rate @ 4.000°/100ft · 2042.41ft MD, 1879.71ft TVD End Dir: 2416.96ft MD, 2113.42ft TVD SV3 SV2 SV1 Continued... 19 September, 2000- 11:27 -3- DrillQuest 1.05.05a Sperry-Sun Drilling Services Proposal Report for Z- 101 NewLoc - Z- 101 Wp 04 North Slope Alaska Measured Sub-Sea Vedical Depth Incl. Azim. Depth Depth (~) (~) (~) 4000.00 58.754 326.928 2850.56 2934.56 4100.00 58.754 326.928 2902.43 2986.43 4200.00 58.754 326.928 2954.31 3038.31 4300.00 58.754 326.928 3006.18 3090.18 4374.84 58.754 326.928 3045.00 3129.00 4400.00 58.754 326.928 3058.05 3142.05 4500.00 58.754 326.928 3109.92 3193.92 4600.00 58.754 326.928 3161.79 3245.79 4665.95 58.754 326.928 3196.00 3280.00 4700.00 58.754 326.928 3213.66 3297.66 4800.00 58.754 326.928 3265.53 3349.53 4900.00 58.754 326.928 3317.40 3401.40 5000.00 58.754 326.928 3369.28 3453.28 5100.00 58.754 326.928 3421.15 3505.15 5200.00 58.754 326.928 3473.02 3557.02 5300.00 58.754 326.928 3524.89 3608.89 5348.41 58.754 326.928 3550.00 3634.00 5400.00 58.754 326.928 3576.76 3660.76 5500.00 58.754 326.928 3628.63 3712.63 5600.00 58.754 326.928 3680.50 3764.50 5700.00 58.754 326.928 3732.37 3816.37 5800.00 58.754 326.928 3784.25 3868.25 5900.00 58.754 326.928 3836.12 3920.12 6000.00 58.754 326.928 3887.99 3971.99 6100.00 58.754 326.928 3939.86 4023.86 6142.68 58.754 326.928 3962.00 4046.00 6200.00 58.754 326.928 3991.73 4075.73 6215.94 58.754 326.928 4000.00 4084.00 6300.00 58.754 326.928 4043.60 4127.60 6400.00 58.754 326.928 4095.47 4179.47 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 1887.74 N 1229.29 W 5961231 .~ N" 598404.79 E 1959.38 N 1275.94 W 5961302~'29 N 598357.19 E 2031.03 N 1322.60 W 596~73.31::N :.?: .....598309.59 E 2102.67 N 1369.25 W 5~?i444.33 598261.99 E 2156.29 N 1404.17 W ~1497,48 N ~ :::" 598226.36 E 2174.31 N 1415.90 W ..... 596~5;I..5.35 N 598214.39 E 2245.96 N 1462.56 Wi?'ii:i.:i'::'iiiii:'~-.,~596~:~'~;36 N598166.79 E 2317.60 N 1509.21 ~i':.i:-:i!:'.i::': i ::~96165~.38 N 598119.19 E ~:..: !~ ::! !~ :':~ i':;iii:" 2364.85 N 1539;98 W :-?i';i;?.ii:;5961704.22 N 598087.79 E 2389.24 N ~555;87: W :~.:ii!:.;i:~. 5961728.40 N 598071.59 E .... -.i::i!:i.:':':?"!:''' ~;~:ii~'~:;i'?:~::~ ::i'!i': 2460.89 N .... ? 5961799.42 N 598023.99 E .... ~:. 2532 53 N ~:.:.:'%'i.:;~ 16~9,.:17 W 5961870.44 N 597976.39 E 2604.17-:!~i':''~ ............. ~'ii;:i:: ~::~6~'~ W 597928.79 E 2675.~;:i~::.~.:~, ":ii~42.48 W 597881.19 E 2747.46 'Ni:?.ii:: i; ...... ii:~i~89.14 W 597833.59 E 2819.11 N ~; .... 1835.79W 2853.79 N 1858.37 W 2890.75 N 1882.44 W 2962.39 N 1929.10 W 3034.04 N 1975.75 W 5961941.46 N 5962012.48 N 5962083.49 N 5962154.51N 5962188.89 N 5962225.53 N 5962296.55 N 5962367.57 N 597785.99 E 597762.94 E 597738.39 E 597690.79 E 597643.19 E 3105.68 N 2022.40W 5962438.59 N 597595.59 E 3177.32 N 2069.06W 5962509.60 N 597547.99 E 3248.97 N 2115.71W 5962580.62 N 597500.39 E 3320.61N 2162.37W 5962651.64 N 597452.79 E 3392.25 N 2209.02W 5962722.66 N 597405.19 E 3422.83 N 2228.93W 5962752.97 N 597384.87 E 3463.90 N 2255.67W 5962793.68 N 597357.59 E 3475.32 N 2263.11W 5962805.00 N 597350.00 E 3535.54 N 2302.33W 5962864.70 N 597309.99 E 3607.18 N 2348.98W 5962935.72 N 597262.39 E Dogleg Rate (°/100fi) 0.000 o.000 0.000 0.000 0.000 0.000 0.000 0.000 o.000 0.000 0.000 0.000 0.0o0 0.000 0.000 0.000 0.000 0.000 o.000 o.0o0 0.000 0.000 0.000 0.000 0.000 0.000 0.o00 o.000 0.000 0.ooo Alaska State Plane 4 PBU_WOA Z Pad Vedical Section (fi) 2251.48 2336.93 2422.38 2507.82 2571.78 2593.27 2678.72 2764.17 2820.52 2849.62 2935.07 3020.51 3105.96 3191.41 3276.86 3362.31 3403.67 3447.75 3533.20 3618.65 3704.10 3789.55 3874.99 3960.44 4045.89 4082.36 4131.34 4144.96 4216.79 4302.24 Comment 9 5/8" Casing UG4A UG3 UG1 Taraet - 7-101 Schrader, Geo'logical Continued... 19 September, 2000 - 11:27 - 4 - DrillQuest 1.05.058 Sperry-Sun Drilling Services Proposal Report for Z-101 NewLoc - Z-101 Wp 04 North Slope Alaska Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (~) (~) 6500.00 58.754 326.928 4147.34 4231.34 6600.00 58.754 326.928 4199.22 4283.22 6700.00 58.754 326.928 4251.09 4335.09 6755.74 58.754 326.928 4280.00 4364.00 6800.00 58.754 326.928 4302.96 4386.96 6900.00 58.754 326.928 4354.83 4438.83 6989.01 58.754 326.928 4401.00 4485.00 7000.00 58.537 326.967 4406.72 4490.72 7100.00 56.561 327.332 4460.37 4544.37 7165.36 55.270 327.579 4497.00 4581.00 7200.00 54.586 327.714 4516.91 4600.91 7300.00 52.612 328.115 4576.25 4660.25 7400.00 50.639 328.538 4638.32 4722.32 7500.00 48.669 328.985 4703.06 4787.06 7580.42 47.085 329.365 4757.00 4841.00 7600.00 46.700 329.460 4770.38 4854.38 7700.00 44.733 329.967 4840.20 4924.20 7800.00 42.769 330.510 4912.43 4996.43 7900.00 40.807 331.096 4986.99 5070.99 8000.00 38.849 331.729 5063.78 5147.78 8100.00 36.894 332.419 5142.72 5226.72 8122.79 36.449 332.585 5161.00 5245.00 8200.00 34.943 333.174 5223.70 5307.70 8300.00 32.998 334.006 5306.63 5390.63 8400.00 31.059 334.930 5391.40 5475.40 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3678.83 N 2395.64 W 5963006.73 N 597214.79 E 3750.47 N 2442.29 W 59630~5 N 597167.19 E 3822.11 N 2488.94 W 5963~,77 NI.- 597119.59 E 3862.05 N 2514.95 W 5~3188.36 N 597093.06 E 3893.76 N 2535.60 W [59632J9~79 N 597071.99 E 3965.40 N 2582,25 W:.:~..~ ~ 59632~),Sl N 597024,39 E 4029,17 N 2623,78 W';;i:.." ~.5963354,O2 N 596982,02 E 4037,04 N 26~,:.~)0 Wi:";: ;:! 5963361,82 N 596976,80 E 4107,92 N .... ~67~67~ W 5963432,09 N 596930,09 E 4153,55 N ~:i~703,79:W? ;i::.i..:5963477,33 N 596900,37 E 4177,50 N ........ 27~8:96 W ..... 5963501,08 N 596884,88 E 4245 69 ~i?:'i:"? i i~;ii:.::;;2~{ii~2 W 5963568,69 N 596841,22 E :-.':'~:~'~i:'" .... :'~:~:::~:~:~: 4312.~i::N..:~ "~!i2802;88 W 5963634.86 N 596799.17 E 4377.56:':Ni:iii~ i:2842.41 W 5963699.48 N 596758.79 E 4428.78 N:'~i': ii.!iiii! i:i.iii!:i:'~872.98 w 5963750.29 N 596727.54 E 4441.09 N 2880.25W 5963762.50 N 596720.11E 4502.90 N 2916.36W 5963823.83 N 596683.18 E 4562.92 N 2950.69W 5963883.39 N 596648.06E 4621.09 N 2983.20W 5963941.12 N 596614.78 E 4677.32 N 3013.85W 5963996.94 N 596583.39 E 4731.55 N 3042.61W 5964050.79 N 596553.91E 4743.63 N 3048.89W 5964062.78 N 596547.47 E 4783.72 N 3069.43W 5964102.60 N 596526.40 E 4833.76 N 3094.29W 5964152.30 N 596500.88 E 4881.61 N 3117.16W 5964199.84 N 596477.38 E Dogleg Rate (°/100fi) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 Alaska State Plane 4 PBU_WOA Z Pad Ve~ical Section (~) 4387.68 4473.13 4558.58 4606.21 4644.03 4729.48 4805.53 4814.91 4899.26 4953.37 4981.72 5062.19 5140.58 5216.79 5276.44 5290.73 5362.31 5431.43 5498.03 5562.01 5623.29 5636.88 5681.81 5737.49 5790.27 Comment WS2 Be~in Dir @ 2.000°/100ft: 6989.01ft MD, 4485.00ft TVD WS1 CM3 OM2 Continued... 19 September, 2000 - 11:27 - 5 - DrillQuest 1.05.05a Sperry-Sun Drilling Services Proposal Report for Z-101 NewLoc - Z-101 Wp 04 North Slope Alaska Measured Sub-Sea Vedical Depth Incl. Azim. Depth Depth 8500.00 29.128 335.965 5477.92 5561.92 8600.00 27.205 337.132 5566.08 5650.08 8700.00 25.293 338.461 5655.76 5739.76 8800.00 23.395 339.992 5746.87 5830.87 8900.00 21.514 341.776 5839.28 5923.28 9000.00 19.656 343.881 5932.89 6016.89 9038.62 18.946 344.799 5969.34 6053.34 9100.00 18.946 344.799 6027.40 6111.40 9200.00 18.946 344.799 6121.98 6205.98 9300.00 18.946 344.799 6216.56 6300.56 9400.00 18.946 344.799 6311.14 6395.14 9403.02 18.946 344.799 6314.00 6398.00 9500.00 18.946 344.799 6405.73 6489.73 9600.00 18.946 344.799 6500.31 6584.31 9685.86 18.946 344.799 6581.52 6665.52 9685.88 18.945 344.799 6581.54 6665.54 9695.88 18.945 344.799 6591.00 9700.00 18.946 344.799 6594.89 9800.00 18.946 344.799 6689.48 9891.48 18.945 344.799 6776.00 9900.00 18.946 344.79g 6784.06 10000.00 18.945 344.799 6878.64 10091.48 18.945 344.799 6965.16 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (f) (ft) 4927.20 N 3138.00 W 5964245.!::6 N:' 596455.93 E 4970.50 N 3156.80 W 5964288720 ~:. 596436.56 E 5011.44 N 3173.53 W 5964328'~91N i: 596419.29 E 5049.96 N 3188.17 W 5~367.24 N ::: :;i:: :::: 596404.14 E 5086.04 N 3200.70 W ::i;~44~-15 N ..... 596391.14 E 5119.62 N 3211.10 W~. 59~436.58 N 596380.29 E : ::,:: ~::~:: 5131.91 N 3214.55 W::i:ii: ..i:~5964~;83 N 596376.68 E 5151.14 N 3219.77 W:':~: ;~ :~ :59~467.99 N 596371.20 E 5182.47 N ::3228"~ W '::: :.: 5964499.20 N 596362.27 E 5213.80 N .... 1'3236,~i~ .... 5964530.42 N 596353.34 E 5245.14 N?.:.;.:::.:.:;;.:..: 32~!57.31 W ...... 5964561.64 N 596344.42 E 5246.08N:":' '"":"..'::::"3245;'57 W 5964562.58 N 596344.15 E .....: :... 5276.47:,N. ":~.:.3253.83 W 5964592.85 N 596335.49 E ..:::. ...... . ....... 5307.80 N.::i:i:::!::... .:.:::3262.34 W 5964624.07 N 596326.56 E 5334.70 N"...: '.":;':i.-..... ::..:~269.65 W 5964650.87 N 596318.89 E 5334.71 N 3269.65 W 5964650.88 N 596318.89 E 6675.00 5337.84 N 3270.50W 5964654.00 N 596318.00 E 6678.89 5339.13 N 6773.48 5370.46 N 6860.00 5399.12 N 6868.06 5401.79 N 6962.64 5433.12 N 7049.16 5461.78 N ?D 3270.85W 5964655.28 N 596317.63 E 3279.36W 5964686.50 N 596308.70 E 3287.15W 5964715.06 N 596300.54 E 3287.88W 5964717.72 N 596299.78 E 3296.39W 5964748.93 N 596290.85 E 3304.18W 5964777.49 N 596282.68 E Dogleg Rate (°/100fi) 2.000 2.000 2.000 2.000 2.000 2.000 2.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Alaska State Plane 4 PBU_WOA Z Pad Ve~ical Section 5840.07 5886.84 5930.53 5971.07 6008.42 6042.54 6054.84 6074.O0 6105.21 6136.42 6167.64 6168.58 6198.85 6230.06 6256.86 6256.87 6259.99 6261.28 6292.49 6321.04 6323.70 6354.92 6383.47 Comment End Dir: 9038.62ft MD, 6053.34ft TVD HRZ Be(lin Dir @ 2.000°/100ft: 9685.86ft MD, 6665.52ft TVD End Dir: 9685.88ft MD, 6665.54ft TVD Kuparuk Target - Z 1,01 Ku~ T, arg, , 150.00 Ra(]ius., ~eo~og~caJ Miluveach Total Depth: 10091.48ft MD, 7049.16ft TVD 7" Casing Continued... 19 September, 2000 - 11:27 f,?,':..:?iO;~,g.3 - 6 - DrillQuest 1.05.05a Z-101 Ri.qsite Summary of Drilling Hazards POST THIS NOTICE IN THE DOGHOUSE Z Pad is not designated as an H2S drill site, however Standard Operating Procedures for H2S precautions should be followed at all times. The highest level of H2S ever measured on Z Pad has been 21 ppm from 7-18. Z Pad has a history of gas hydrate problems while drilling both the surface and intermediate hole sections. On the three most recent Z Pad wells gas hydrate problems were minimized in the surface hole and basically eliminated from the intermediate section. By setting the surface casing deeper, down below the SV1 sands rather than above, hydrates were eliminated from the intermediate hole. In the surface hole, hydrate gas was minimized by bringing the mud weight to 10.2 ppg by the Base Permafrost and by pre-treating the mud system with 2 ppb Driltreat (Lecithin). Additional measures include reducing flow rates to -450 to 500 gpm and keeping the mud temperature cool. The shallow intervals beneath Z Pad are highly faulted. These faults have a history of being conductive and have resulted in several lost circulation incidents. As planned, the Z-101 well path should not cross any faults and has been optimized to avoid cutting any permeable sands near the damaged zones of these faults. However, the possibility of encountering losses still exists. To be prepared for any potential lost circulation, a copy of the 'Recommended Lost Circulation Procedures' and the 'Lost Circulation Decision Tree' will be sent to the rig prior to drilling out in the 8-3/4" production interval. Gas cut mud has been observed in the Ugnu (3196' TVDss) and West Sak (4280' TVDss) sands. This will be controlled with appropriate mud weights. A minimum of 9.3 ppg is recommended. The Z-101 well path will drill a full section of the HRZ shale. The HRZ has not proven troublesome in the Z Pad area, however precautions will be taken to aid in shale stabilization. Increased mud weights and inhibitive drilling fluids will be used. Differential sticking could be problematic in both hole sections. Avoid leaving drill string stationary for extended periods, tighten fluid loss properties of mud, and string in Barofibre prior to penetrating highly permeable sand intervals. CONSULT THE S PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION Version 1.0 NWE Z-101 Hazards and Contingencies Page ! of 1 H 1 751 37 p~,,,~,~o~ I , p0175:1.37 · VENDOR DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 092600 ;KO92600A 100. O0 100. O0 PYMT C::3MMENTS' PERMI'T TD DRILL FEE HANDLI,~Q INST' S/H TERRIE HUBBLE X4628 : THE ATrACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. ~ 1 OO. OO I :,~.':'~,o'~'~.:...~:::..***.~ NO. H 1::'-:7'-51 'T:-:"::.: -": :'? .~A~'!'~I~i~IATE. 0'~ --!:!!i:" :-' .... ? '"':' "' .... ' ' ' :~.%~::-'::. NA~'ION~[-:~IW..~K .:'': :' :: CONSO~]D~[DC~M~cI~'A ;:::'ih.? ' ':'~;~.:-:56-3897.];'~" -'-. -.: ';~0175137 ':' ': 412 ... ,"~.:.-'... ~' ,' -':!. '--,.-'::!::::;" '....::.-::~- ::??;::.,. · ::~J~.-!.::--. ";.::?:i:!~:. ': ' '"' : '.':":":- ~-Y:' . '' ON'E:~.:"~N~'~:ED;;;}~ ;~;~.:-I :':'?' :'::':'' ''' '::::?~ ;}?;*: ~''~:':'':' :::::::::::::::::::::: '(" :':' '*':'""; ..... ':":: :- :: *::;:: ::'-: .. ':, {~-~-' ;;.~---.:' ~}~*- --.::? ""-;:~'::.;~':-?-? O~/2~/OODATE ::?':}~;:: ....... '"'*]~;?" "::'~:;:" ' ['" :' '":(:~};'~MOUNT~Ioo, OO A~ER 120 DAYS ..:..". ...-.. ':::' .'. -;..:" : :;:[. '..Z' .... :...?::::,.::.. :-'::-.,-:.-- ..... :.:.? ::.:: :WELL PERMIT CHECKLIST FIELD & POOL COMPANY ADMINISTRATION R DATE ~/0. ~,c:~ :.NGINEERING WELL NAME INIT CLASS 1. Permit fee attached. 2. Lease number approl:;ri~t?~. 3. Unique well name and.number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... .. 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... GEOLOGY 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg .... .... 18. CMT will cover all known productive horizons .......... PROGRAM: exp dev /reddl serv 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 31. 32. 33. 34. ANNULAR DISPOSAL35. With proper cementing records, this plan GEOLAREA )N )U UNIT# wellbore sag ann. disposal para req ON/OFF SHORE Casing designs adequate for C, T, B & permafrost ....... . - - Adequate tankage or reserve pit ................. ' If a re-drill, has a 10-403 for abandonment been approved... Adequate wellbore separation proposed ............. If diverter required, does it meet regulations .......... ~ N Drilling fluid program schematic & equip list adequate ..... BOPEs, do they meet regulation ......... ~_.~. ..... (,.~} N BOPE press rating appropriate; test to ~(~ ~ psig. ~) N yAb,,c>~_ ':. ;;)'h,~-~ \ Choke manifold complies w/APl RP-53 (May 84) ........ ~ N Work will occur without operation shutdown ........... Is presence of H2S gas probable ................. Y ~ . Permit can be issued wlo hydrogen sulfide measures ..... ~ _ ., ,. . . Data presented on potential overpressure zones ....... g./~v Seismic analysis of shallow gas zones ........... '.~(~ Y N ~.~. ~'/~ ~"~'. '"'/ Seabed condition survey (if off-shore) ....... '.. ~ Y N Contact name/phone for weekly progress reports [~ploratory only] Y N (A) will contain waste in a suitable receiving zone; ....... Y N (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; . (C) will not impair mechanical integrity of the well used for disposal; Y N Y N APPR DATE (D) will not damage producing formation or impair recovery from a pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N ,/ GEOLOGY: ENGINEERING: Ul~,/~nnular COMMISSION: Comments/Instructions: z .( O ITl c:\msoffice\wordian~diana\checklist (rev. 02117/00) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi No'special'effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Mon Jan 28 11:37:02 2002 Reel Header Service name ............. LISTPE Date ..................... 02/01/28 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Coraments ................. STS LIS Writing Library. Tape Header Service name ............. LIST?E Date ..................... 02/01/28 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER ?rudhoe Bay Unit MWD/MAD LOGS WELL NAME:~ API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MM-00308 R. KRELL T. ANGLEN Borealis Z-101 500292297800 BP Exploration (Alaska), Inc. Sperry-Sun Drilling Services 28-JAN-02 MWD RUN 2 MWD RUN 3 AK-MM-00308 AK-MM-00308 M. HANIK R. KRELL J. RALL W. STAFFORD JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MAD RUN 3 AK-MM-00308 R. KRELL W. STAFFORD 19 lin 12E 4557 3014 .00 81.80 53.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 12.250 20.000 110.0 2ND STRING 8.500 9.625 4294.0 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH SUBSEA (TVDSS), PER REQUEST OF CUSTOMER. 3. MWD RUN 1 WAS DIRECTIONAL WITH DUAL GAi~MA RAY (DGR, UTILIZING GEIGER-MUELLER TUBE DETECTORS). 4. MWD RUNS 2 AND 3 COMPRISED DIRECTIONAL, DGR, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 5. THE INTERVAL 9537'MD/6587'TVDSS - 9655.5'MD/6687'TVDSS WAS CORED. 6. DATA OVER THE INTERVAL 9450'MD/6513'TVDSS - 9655.5'MD/6687'TVDSS (INCLUDING THE CORED INTERVAL) WERE ACQUIRED ON A MEASUREMENT AFTER DRILLING (MAD) PASS WHILE RIH FOR MWD RUN 3. 7. DIGITAL DATA ONLY ARE DEPTH-SHIFTED TO A SCHLUMBERGER GAMMA RAY PDC LOG (AIT) RUN ON 5 JANUARY 2001. 8. MWD RUNS 1-3 REPRESENT WELL Z-101 WITH API#: 50-029-22978-00. THIS WELL REACHED A TOTAL DEPTH(TD)OF 9950'MD/6947'TVDSS. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SRAT = SMOOTHED TOOL RUNNING SPEED WHEN NOT DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. EXTRA SHALLOW MEDIUM DEEP CURVES WITH AN 'M' SUFFIX DENOTE MAD PASS DATA $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR ROP RPS RPX FET RPM RPD $ .5000 START DEPTH 100.0 108 5 4275 5 4275 5 4275 5 4275 5 4275 5 STOP DEPTH 9921 0 9951 5 9913 5 9913 5 9913 5 9913 5 9913 5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH 4242.5 4267.5 4272.5 4293.0 4301.0 4347.5 4359.0 4364.0 4376.0 4378.0 4399.5 4405.5 4416.0 4422.5 4430.5 4438.0 4452.0 4454.0 4477.0 4489.0 4494.0 4499.5 4506.5 4509.0 4519.0 4526.0 4531.0 4554.5 4563.0 4586.5 4618.0 4625 0 4634 5 4642 0 4657 5 4664 0 4671 0 4679.5 4682.5 4690.5 4703.5 4713.5 4731.5 4735.0 4739.5 4743.5 4750.5 4756.0 4762.5 4774.0 4782.0 4792.0 4800.5 4805.0 4808.5 4831.0 4833.0 4836.0 4838.5 4864.5 4867.5 4900.0 4906.0 4933.5 4941.0 4954.5 4966.5 4978.0 4982.0 4984.5 5001.5 5010.5 GR 4242 5 4266 5 4272 0 4293 0 4303 0 4350 5 4361 5 4365 5 4377 0 4378 5 4400 5 4407 5 4416 5 4422 5 4432 5 4439 0 4452 5 4456 0 4477 0 4488 5 4495 5 4499 5 4507 5 4509 5 4520 0 4526 5 4532 5 4555 0 4566 0 4589 0 4620 0 4626 0 4635 0 4643 5 4658 5 4665 0 4673 5 4680 5 4684 0 4690 0 4703 0 4714 5 4733 0 4736 5 4740 5 4743 5 4751 0 4757 0 4764 5 4775 5 4783 0 4792 0 4800 5 4804 5 4809 0 4831 0 4833 0 4836 0 4840 5 4869 5 4874 0 4902 5 4906 5 4931 5 4940 0 4956 5 4968 0 4979 0 4981 5 4986 0 5001 5 5011 0 5022 0 5026 5 5034 5 5039 5 5044 5 5048 5 5055 5 5063 0 5067 5 5072.0 5084.5 5091.5 5112.5 5121 0 5140 0 5142 0 5154 0 5165 5 5168 0 5184 0 5202 5 5220 0 5229 5 5258 5 5264 0 5271 0 5288 0 5302 0 5312 0 5314 5 5335 5 5346.5 5360 0 5379 0 5383 0 5402 5 5440 0 5455 0 5460 5 5467 0 5468 5 5485 5 5600 0 5622 5 5632 0 5651 5 5664 0 5693 0 5698 0 5712 0 5715 5 5747 5 5759 0 5762 5 5772 0 5785 5 5799 0 5801 5 5832 0 5890 0 5924 0 5943 0 5949 0 5955 5 5961.0 5968.5 5977.5 6000.5 6024.5 6032 0 6044 5 6053 5 6055 5 6063 5 6073 0 6101 5 5022.0 5028.0 5036 0 5041 0 5044 0 5047 5 5052 5 5063 0 5067 0 5071 5 5082 0 5091 5 5113 5 5121 0 5141 0 5142 0 5154 5 5165.0 5168.0 5182.5 5202.0 5221.5 5229 5 5258 0 5263 5 5270 5 5286 0 5301 5 5312 5 5315 5 5336 0 5347 0 5358 5 5378 5 5382 5 5402 0 5437 0 5454 0 5457 5 5465.5 5467.5 5485.0 5600.0 5623.5 5632.5 5652.5 5665.5 5689.0 5694 5 5708 5 5713 5 5746 0 5757 5 5761 0 5772 0 5785 5 5799 0 5802 5 5832 5 5888 0 5921 5 5941 5 5947 5 5953 0 5959 0 5966 0 5975 5 5997 5 6022 0 6031 0 6042 5 6051 5 6054 0 6061 5 6070 0 6097 0 6108.0 6112.5 6119.5 6122.0 6130.0 6146.5 6184.0 6200.0 6222.5 6238.5 6250.0 6265.0 6272.0 6284.5 6292.0 6319.0 6350.0 6376 5 6398 5 6418 0 6421 0 6431 0 6461 0 6471 0 6502 5 6510 5 6516 5 6526 5 6543 0 6553 0 6561 5 6568 0 6589.0 6603.5 6606.5 6617.0 6626.5 6633.0 6646.5 6658.0 6672 0 6678 5 6686 0 6690 0 6721 5 6729 0 6744 0 6755 5 6786 5 6809 5 6818 5 6851 5 6873 0 6887 5 6905 0 6917 5 6927 5 6932 5 6947 0 6961 0 6963 0 6997 5 7004 5 7008 0 7029 5 7064 0 708O 0 7104 0 7127 0 7147 5 7162 0 7164 0 7180 0 7197 0 7219.5 7230.5 6104 0 6109 0 6116 0 6118 0 6129 0 6144 5 6180 0 6197 5 6219 5 6239 0 6252 0 6265 0 6272 0 6282.5 6291.0 6317.0 6349.5 6378.0 6397.5 6416.5 6420.5 6430.5 6461 5 6471 5 6502 0 6510 5 6515 0 6524 0 6541 0 6550 0 6557 5 6564 5 6585 0 6599 5 6603 5 6618 0 6627 0 6634 5 6645 5 6657 0 6670 5 6678 0 6686.0 6690.0 6723.0 6731.0 6746.5 6755.0 6789.0 6810.5 6821.5 6854.0 6873.5 6889.5 6908.0 6919.0 6930.0 6933 5 6948 0 6962 0 6963 5 6999 0 7005 5 7009 5 7030 0 7064 5 7080 0 7105 5 7128 5 7149 0 7162 0 7164 5 7180 0 7198 0 7218 0 7229 0 7274.5 7287.0 7305.0 7324 5 7365 5 7451 0 7478 5 7492 0 7533 5 7549 0 7556 5 7577 5 7582 5 7597 0 7649 5 7659 5 7678 5 7685 5 7694 5 7735 0 7776 5 78O0 5 7803 0 7807 0 7830 5 7863. 5 7871.0 7893.5 7927.5 7931.0 7940.0 8028.5 8038.0 8075.5 8092.0 8141.5 8158.0 8168.5 8204.5 8217.0 8230.0 8237.5 8245.0 8274.0 8281.0 8300.0 8312.0 8356.0 8363.0 8385.0 8403.5 8412.0 8430.5 8445.0 8449.0 8450.5 8479.5 8492.5 8502.0 8511.5 8538.0 8548.5 8557.0 8581.0 8595.5 8599.0 8607.0 8618.5 8624.0 8631.5 8641.5 8659.0 8670.0 8683.0 8694.5 8721.5 7273 7287 7305 7323 7365 7451 7477 7491 7531 7548 7555 7576 7582 7596 7649 7660 7680 7686 7693 7735 7774 7799 7803 7805 7828 7862 7869 7892 7926 7930 7939 8027 8036 8072 8087 8139 8154 8164 8201 8213 8225 8234 8240 8270 8277 8297 8312 8353 8360 8383 8402 8412 8429 8443 8446 8448 8478 8491 8501 8511 8536 8546 8555 8581 8595 8598 8606 8617 8622 8629 8641 8658 8669 8681 8693 8719 .5 .0 .0 .0 .0 .0 .0 .5 .5 .0 .5 .5 .0 .5 .0 .5 .0 0 0 0 0 0 0 5 5 0 5 0 0 5 0 5 0 0 5 0 0 5 0 5 5 0 0 5 0 5 5 0 0 0 5 5 5 0 5 5 0 5 0 0 5 0 5 5 5 5 5 5 5 5 5 0 0 5 5 5 8738 8748 8758 8781 8800 8806 8827 8855 8870 8876 8887 8889 8895 8924 8934 8947 8956 9006 9032 9038 9057 9061 9091 9118 9149 9165 9169 9191 9197 9207 9253 9267 9271 9276 9287 9291 9303 9312 9316 9322 9332 9338 9348 9377 9394 9400 9402 9405 9416 9430 9448 9466 9474 9488 9513 9528 9536 9540 9543 9555 9582 9592 9600 9605 9609 9638 9649 9655 9676 9694 9801 9838 9864 9921 $ .0 .5 .5 .0 .5 .0 .0 .0 .5 .5 .0 .0 .0 .5 .0 .5 .5 .5 .0 .5 .5 .5 .0 ,5 .0 .0 ,5 .0 .5 .5 .0 .0 .0 .0 .5 .5 .5 .0 .0 .5 .0 .5 .5 .0 .0 .0 .0 .0 .0 .0 .0 .5 .5 .5 .5 .5 5 0 5 5 5 5 0 0 5 0 0 0 5 0 0 0 0 0 8735 8745 8756 8779 8797 8802 8823 8855 8869 8875 8884 8887 8893 8922 8931 8945 8956 9003 9029 9037 9056 9060 9089 9116 9147 9162 9166 9187 9194 9204 9249 9263 9267 9272 9283 9287 9299 9308 9312 9319 9328 9336 9345 9373 9389 9395 9398 9401 9413 9427 9443 9461 9469 9488 9512 9527 9534 9536 9542 9553 9580 9590 9599 9605 9609 9638 9649 9655 9676 9694 9801 9837 9863 9919 5 5 0 0 0 5 5 0 5 0 5 5 0 0 5 0 5 5 5 0 5 0 0 0 5 0 5 5 5 5 5 5 0 0 0 0 0 5 5 5 0 0 5 5 5 5 0 5 0 5 5 5 5 5 5 5 5 5 0 5 .5 .5 .5 .0 .5 .0 .0 .0 .5 .5 .0 .5 .0 .5 MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 1 100.0 4313.5 2 4313.5 9537.0 3 9537.0 9950.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD API 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 Units Size Nsam Rep Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 100 9951.5 ROP MWD FT/H 0 3901.92 GR MWD API 12.76 430.8 RPX MWD OHMM 0.6 2000 RPS MWD OHMM 0.13 27.54 RPM MWD OHMM 0.82 2000 RPD MWD OHMM 0.17 2000 FET MWD HOUR 0.157167 187.126 First Reading For Entire File .......... 100 Last Reading For Entire File ........... 9951.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Mean Nsam 5025.75 19704 118.347 19687 89.2482 19643 4.45332 11277 4.73022 11277 5.42611 11277 8.53805 11277 4.65969 11277 First Reading 100 108.5 100 4275.5 4275.5 4275.5 4275.5 4275.5 Last Reading 9951.5 9951.5 9921 9913.5 9913.5 9913.5 9913.5 9913.5 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH RPS 9397 5 FET 9397 5 RPM 9397 5 RPX 9397 5 RPD 9397 5 GR 9404 0 RAT 9435 0 $ MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MWD 3 1 $ REMARKS: MERGED MAD PASS. $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 STOP DEPTH 9655 5 9655 5 9655 5 9655 5 9655 5 9655 5 9655 5 MERGE TOP MERGE BASE 9393.0 9655.5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RAT MAD FT/H 4 1 68 4 2 GR MAD A?I 4 1 68 8 3 RPX MAD OHMM 4 1 68 12 4 RPS MAD OHMM 4 1 68 16 5 RPM MAD OHMM 4 1 68 20 6 RPD MAD OHMM 4 1 68 24 7 FET MAD HOUR 4 1 68 28 8 Name Service Unit Min Max DEPT FT 9397.5 9655.5 RAT MAD FT/H 12.8 751.79 GR MAD API 56.54 280.42 RPX MAD OHMM 0.6 25.62 RPS MAD OHMM 0.91 27.54 RPM MAD OHMM 1.11 27.9 RPD MAD OHMM 1.26 22.49 FET MAD HOUR 34.1403 189.566 First Reading For Entire File .......... 9397.5 Last Reading For Entire File ........... 9655.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Mean 9526.5 167.295 127.522 3.87652 4.35344 4.66133 4.81188 145.89 Nsam 517 442 504 517 517 517 517 517 First Reading 9397.5 9435 9404 9397.5 9397.5 9397.5 9397.5 9397.5 Last Reading 9655.5 9655.5 9655.5 9655.5 9655.5 9655.5 9655.5 9655.5 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 100.0 4259.0 ROP 108.5 4313.5 $ LOG HEADER DATA DATE LOGGED: 19-DEC-00 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 4314.0 TOP LOG INTERVAL (FT): 100.0 BOTTOM LOG INTERVAL (FT): 4314.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .0 MAXIMUM ANGLE: 59.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB01770CG8 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 12.250 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: SPUD MUD DENSITY (LB/G): 10.20 MUD VISCOSITY S): 180.0 MUD PH: 9.5 MUD CHLORIDES PPM): 300 FLUID LOSS (C3 : 8.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 90.5 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 100 4313.5 2206.75 8428 ROP MWD010 FT/H 0 2361.42 116.278 8411 GR MWD010 API 12.76 123.21 69.7719 8319 First Reading For Entire File .......... 100 Last Reading For Entire File ........... 4313.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 First Reading 100 108.5 100 Last Reading 4313.5 4313.5 4259 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 4259.5 9506.0 RPX 4275 0 9498.5 RPS 4275 0 9498.5 RPM 4275 0 9498.5 RPD 4275 0 9498.5 FET 4275 0 9498.5 ROP 4314 0 9537.0 $ LOG HEADER DATA DATE LOGGED: 27-DEC-00 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 65.41 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9537.0 TOP LOG INTERVAL (FT): 4314.0 BOTTOM LOG INTERVAL (FT) : 9537.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 31.5 MAXIMUM ANGLE: 60.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PBO1757HWRG6 EWR4 ELECTROMAG. RESIS. 4 PBO1757HWRG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 BOREHOLE CONDITIONS MUD TYPE: 4% KCL MUD DENSITY (LB/G): 10.20 MUD VISCOSITY (S): 50.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 20000 FLUID LOSS (C3): 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .300 MUD AT MAX CIRCULATING TERMPERATURE: .153 MUD FILTRATE AT MT: .330 MUD CAKE AT MT: .320 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Units Size Nsam Rep Code Offset Channel Name Service Order 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 DEPT FT 4 1 68 ROP MWD020 FT/H 4 1 68 GR MWD020 API 4 1 68 RPX MWD020 OHMM 4 1 68 RPS MWD020 OHMM 4 1 68 RPM MWD020 OHMM 4 1 68 RPD MWD020 OHMM 4 1 68 FET MWD020 HOUR 4 1 68 70.0 143.6 70.0 70.0 Name Service Unit Min Max DEPT FT 4259.5 9537 ROP MWD020 FT/H 0.53 3901.92 GR MWD020 API 22.31 430.8 RPX MWD020 OHMM 0.75 2000 RPS MWD020 OHMM 0.13 26.25 RPM MWD020 OHMM 0.82 2000 RPD MWD020 OHMM 0.17 2000 FET MWD020 HOUR 0.157167 73.4297 First Reading For Entire File .......... 4259.5 Last Reading For Entire File ........... 9537 First Mean Nsam Reading 6898.25 10556 4259.5 124.182 10447 4314 103.347 10494 4259.5 4.69322 10448 4275 4.78673 10448 4275 5.7217 10448 4275 9.26077 10448 4275 1.49087 10448 4275 Last Reading 9537 9537 9506 9498.5 9498.5 9498.5 9498.5 9498.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 9499.0 9912.0 RPD 9499 0 9912.0 RPM 9499 0 9912.0 RPX 9499 0 9912.0 RPS 9499 0 9912.0 GR 9506 5 9919.5 ROP 9537 5 9950.0 $ LOG HEADER DATA DATE LOGGED: 04-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 65.41 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9950.0 TOP LOG INTERVAL (FT): 9537.0 BOTTOM LOG INTERVAL (FT): 9950.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 25.4 MAXIMUM ANGLE: 32.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PBO1784HRG6 EWR4 ELECTROMAG. RESIS. 4 PBO1784HRG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: Water Based MUD DENSITY (LB/G): 10.30 MUD VISCOSITY (S): 76.0 MUD PH: 9.7 MUD CHLORIDES (PPM): 19500 FLUID LOSS (C3) : 3.1 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .260 67.0 MUD AT MAX CIRCULATING TERMPERATURE: .148 123.0 MUD FILTRATE AT MT: .200 67.0 MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD030 FT/H 4 1 68 GR MWD030 API 4 1 68 RPX MWD030 OHMM 4 1 68 RPS MWD030 OHMM 4 1 68 RPM MWD030 OHMM 4 1 68 RPD MWD030 OHMM 4 1 68 FET MWD030 HOUR 4 1 68 .410 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 67.0 Name Service Unit Min Max DEPT FT 9499 9950 ROP MWD030 FT/H 0.08 167.7 GR MWD030 API 52.08 238.59 RPX MWD030 OHMM 0.6 25.62 RPS MWD030 OHMM 0.91 27.54 RPM MWD030 OHMM 1.11 27.9 RPD MWD030 OHMM 1.26 22.49 FET MWD030 HOUR 0.364 187.126 First Reading For Entire File .......... 9499 Last Reading For Entire File ........... 9950 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Mean 9724.5 67.2461 105.489 3.75044 3.9082 4.00345 4.13845 44.9473 Nsam 903 826 827 827 827 827 827 827 First Reading 9499 9537.5 9506.5 9499 9499 9499 9499 9499 Last Reading 9950 9950 9919.5 9912 9912 9912 9912 9912 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 3 MAD PASS NUMBER: 1 FILE SUMMARY VENDOR TOOL CODE START DEPTH RPD 9393 0 RPM 9393 0 RPS 9393 0 FET 9393 0 RPX 9393 0 GR 9400 5 RAT 9432 0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S): MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 STOP DEPTH 9655 5 9655 5 9655 5 9655 5 9655 5 9655 5 9655 5 04-JAN-01 Insite 65.41 Memory 9655.5 9450.0 9655.5 25.4 32.3 TOOL NUMBER PBO1784HRG6 PBO1784HRG6 8.500 Water Based 10.30 76.0 9.7 19500 3.1 .260 67.0 .148 123.0 .200 67.0 .410 67.0 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 RAT MAD031 FT/H 4 1 68 GR MAD031 API 4 1 68 RPX MAD031 OHMM 4 1 68 RPS MAD031 OHMM 4 1 68 RPM MAD031 OHMM 4 1 68 RPD MAD031 OHMM 4 1 68 FET MAD031 HOUR 4 1 68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 9393 9655.5 RAT MAD031 FT/H 12.8 751.79 GR MAD031 API 56.54 280.42 RPX MAD031 OHMM 0.6 25.62 RPS MAD031 OHMM 0.91 27.54 RPM MAD031 OHMM 1.11 27.9 RPD MAD031 OHMM 1.26 22.49 FET MAD031 HOUR 34.1403 189.566 First Reading For Entire File .......... 9393 Last Reading For Entire File ........... 9655.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/01/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Mean 9524.25 163.721 127.797 3.86331 4.33593 4.64057 4.80287 145.748 First Last Nsam Reading Reading 526 9393 9655.5 448 9432 9655.5 511 9400.5 9655.5 526 9393 9655.5 526 9393 9655.5 526 9393 9655.5 526 9393 9655.5 526 9393 9655.5 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 02/01/28 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 02/01/28 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File