Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout190-013BP EXPLORATION Exploration Department Mr. David W. Johnston, Chairman Alaska Oil a, nd Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Subject- Location Clearance Inspection - North Slope Wells BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 November 8 1994 Dear Commissioner Johnston' Reference is made to your September 2, 1994 letter, a copy of which is attached for your reference. At this time BPX plans for the noted wells are as follows: 1) 2) 3) BPX Ekvik #1 - Our current plan is to inspect the well site post break-up (circa July, 1995) with the purpose of establishing the status of the marker post at the tundra level. Assuming the post is incorrectly positioned, we plan to return to the site in the Autumn (circa September or October) to rectify and make final clearance. E~P^'" r-a~,, n"' ~ 'Lake #1 - Our plan '~s the same, as notea' for "-,I,e "'"r-,,,v~k" we~i.''~C~I-,[.)./' ~(!~.~ Conoco Badami #1 - BPX assessment indicates ponding around the well location appears extensive and could possibly enlarge. Our plan is to monitor changes in 1995 and obtain necessary permits for filling the depression in 1996-1997. If feasible we would prefer to perform this work in conjunction with Badami development gravel work. NOV - 9 't994 0it & 6as cons, commissiot~ Ancbor~j"~ Letter- Mr. D.W. Johnston, AOGCC November 8, 1994 Page 2 of 2 Please advise should these plans not appear satisfactory or should you have any questions. Very truly yours, Land Manager, Alaska EPZ:Ibs cc: T. J. Obeney RECEIVED NOV -'9 1994 Al2ska Oil & Gas Cons. Commission Anchor~ ALASKA OIL AND GAS CONSERVATION COMMISSION September 2, 1994 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276.7542 SEP 8 - 1994 Land Department (MB12-1) Pete Zseleczky, Mgr BP Exploration (~laska) Inc P O Box 196612 Anchorage, AK 99519-6612 Re: Location Clearance Inspections Eight (8) North Slope Wells. Dear Mr. Zseleczky: On August 24, 1994, our Inspector Lou Grimaldi accompanied Wade Stock, your reprensentaive, on location inspections of six BPX and two Conoco North Slope wells. Three of the wells were not ready for location clearance. On two BPX wells and one Conoco well he found problems on the locations to the extent that he could not recommend location clearance. The wells and the major problems are as follows: BPX Ekvik ~1 PTD 89-020 Casing stub is 1-2' above tundra level. BPX Fawn Lake 1 PTD 90-013 Casing stub is level with the tundra. Conoco Badami #1 PTD 91-144 Depression 8-12' wide x 2-4' deep around well location. Please advise the Commission as to your plans for these wells. Chairman~ -- C: Rory Mayra, BP Environmental Blair Wondzell, PI Spvr, AOGCC RECEIVED NOV -9 1994 ~,~aska Oil & Gas Cons. Commission Anchorc. j; bew/11 bpSnsw MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David J o~~:h-- DATE: Chairmacr"" Blair Wondzell, P. I. Supervisor FROM: Lou Grimaldi,/g,z:~ SUBJECT: Petroleum Inspector THRU: August 24, 1994 FILE NO: FWNLOCLR. DOC Location Clearance inspection BPX Fawn Lake #1 Sec.25, T12N, R13E, Umiat PTD #90-013 Wednesday, Auqust 24, 1994: I made a Location Clearance on BPX exploratory well Fawn Lake #1. Wade Srock (BPX rep.) Accompanied me on my inspection. The location was very clean with all evidence of the drilling activity gone. The marker post consisted of a 4" pipe with the well info bead welded to it. The post had originally been welded to the 9 5/8 but had frost heaved off. The 9 5/8" is not the outside string on this well and I suggest that when the post is rewelded on that a plate be welded on the 13 3/8" casing and the post be welded to that. The casing stub was visible and approximately level with the tundra. This does not conform to accepted surface abandonement procedures which require removal of all casing strings down to 3' - 5' below tundra level. I recommend Fawn Lake #1 not to be granted a final location clearance until the situation with the marker post and casing stub is resolved. SUMMARY: I made a Location Clearance on BPX exploratory well Fawn Lake #1._finding problems with the marker post an~ casing_stub___: Attachments: FWNLOCLR.XL$ Photographs STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Surface Abandonment / Location Clearance Report ( Title 20 AAC 25, Article 2 ) Operator: B.P. Exploration Address: FILE INFORMATION: Surface Location: F L, F L Section 25 ,T 12N ,R 13E ,M Umiat Well Name: PTD No.: APl No. 50- Unit or Lease Name: Field and Pool: Downhole P&A Date: Fawn Lake #1 90-013 Inspection Date: I 20 AAC 25.125 ' ABANDONMENT MARKER: I Approval Date: Steel Post OD: (4" min) 4 "Length (10' min.) ft. Height Above Final Grade Level (4' min.) 10 Top of Marker Post Closed With: welded (Welded, Cmt., Cap), Set: see remarks Distance Below Final Grade Level: ft. Side Outlets: All valves and nipples removed ? ~AII openings closed ? With (On Wellhead, Csg, In Cmt) Marker Plate Diameter: Marker Plate Attached To: Wellhead ,~' Thickness: "Distance Below Final Grade Level: Cutoff Csg Other Information Beadwelded Directly to Marker Post or Blind Marker Plate: ( Note when different from file information) Operator: B.P. EXPLORATION Unit / Lease Name: Well Name: FAWN LAKE #1 Remarks: Marker post frost heaved off of 9 5/8 casin(~,reweld to 13 3/8. Surface Location: Top of post should be 4-6' above tundra level. 2250 F N L, 3180 F E L CasinO not removed deep enough. Section 25 ,T 12N ,R 13E ,M U Inspection Date: 8/24/94 I ~ 20 AAC 25.170 - LOCATION CLEANUP: I Approval Date: PITS: Filled In: Liners Removed or Buried: Debris Removed: SURFACE CONDITION OF PAD AND / OR LOCATION · ( Rough, Smooth, Contoured, Flat, Compacted ) Clean: Clean Type & Quan. of Debris if any remaining on pad and / or location: TYPE AND CONDITION OF SURROUNDING AREA' ( Wooded,Tundra,Grass, Brush, Dirt, Gravel, Sand) Clean: Clean Type & Quan. of Debris if any remaining on surrounding area · TYPE AND CONDITION OF ACCESS ROAD AND SURROUNDING AREA: No evidence of access road ( Dirt, Gravel, Ice, Other) Clean: Clean Type & Quan. of Debris if any remaining on access road or surrounding area · CLEANUP WORK REMAINING TO BE DONE · None RECOMMENDED FOR APPROVAL OF ABANDONMENT: Yes casing not removea aeep enough. Distribution: Reason: orig - Well file c - Operator c - Database c- Inspector FI-000 (Rev. 3/93) No no Marker post needs to be rewelded to casin~/, also post is too tall (10') FINAL INSPECTION: Yes No no INSPECTED BY: Louis R. Grimaldi DATE: FWNLOCLR.XLS ( If "No" See Reason ) 8/24/94 Alaska Oil Gas Conservation Commission 3001 Porcupine Drive · Anchorage. Alaska 995111-3! 92 §07-279-1433 Flcccipt of the following material which was transmitted via is hereby acknowledged: Ouantit~ ~op¥ sent to sender: Yes ~ N~. RECEIVED JUN .] ] 1992 Alaska Oil & Gas Cons. Commission Anchorage -'XPLORATION (ALASKA) P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 ANCHORAGE OFFICE: 900 EAST BENSON BLVD. * ANCHORAGE, ALASKA 99502-0612 · (907) 561-5111 TO: AOGCC ORIGINATOR: J.L. Wicks 3001 Porcupine Drive Anchorage, AK 99501 DATE SENT March 12, 1991 ATTENTION: Larry Grant The following material is being transmitted herewith. Please acknowledge receipt by signing below and returning a copy of this letter: Fawn Lake #1 API 500292200700 Mudlog Blueline Mudlog Reproducible Film RECEIVED : - - u~mc~ Date Received u. & ~u,,.. Anchorage Telecopy No. (907) 276-7542 October 5, 1990 John Wicks BP Exploration (Alaska) P 0 Box 196612 Anchorage, AK 99519-6612 Re: Fawn Lake #1 Permit # 90-13 Btmhole Loc Sec 25 T12N R13W ~ Dear Mr Wicks: We wish to bring to your attention that the Commission has not yet received the following required items on the subject well which our records indicate was completed on February 24, Sepia copy of mud log Section 71(b), Title 20, Chapter 25, Article I, of the Alaska Administrative Code, stipulates that operator shall file this material with the Commission within 30 days after completion, suspension, or abandonment of a drilling well. Please submit the missing material listed above 'to Larry Grant of this office. Sincere ly, f . i '/\ Lonnie ¢ §m£t:h Con, his s loner j o/L.LJG. 06-07 l" ..* ' Y J .,*" """ "f' H .......... I::' !::' r"~ i... I... (l)i...i ill i".~ {-} H r:':',. '¥' Iii; i;i' 1t; P., '~... iii fi!; t:~ ......... iE iii i"'..,.' (3 '.::' l..j Iii: H 'r ~ ~::. 1,.,'"" I.-i F:'... I".;'. Iii; [.-.J l!: 'T' I..I .... I::' I... t!il ~::'~ :!ii; Iii; r:'.'~ C I.( N 0 I,,J I... liil I1) r.'; IE ;:.:,,'",". ~::' .r I::"i" '"' "' r.'; ;..i ', .... "' Y ("~'"' 'i"l-.l '" ~ .... ' ...... ' ....... i:.;', i"...! i",! (l{; .......... ', !ii ::.,. x :i!.' !. 0 A :i. 06 .... !. 570 iii',,:, x :ii:2t";¢'~ :I..'.570 .... :i~040 iii: ,::, :...:.' :~I:, .'.'ii', :iii: ~:i :iii: ,"",.., ..;...', ,"",... ...... . 9.., .,.'...'j ".:.', ;",.., Iii: ,", :.....: :!I:':' "" .... .4 !::i 7' ;'", ,:':":, ,"", 7" ,"", .. .......';. i"1.., "- .... -..- !ii: .,.':, .'.'.:.' :ii: !.:i; ',7 ~-:':-., ':"'-, () 7 () .... 7 ,:f:, :30 8 ,:.', x :ii: :ii.:,' ;i. fi 76 {ii: 0 .... :iii.'.'i!: 60 . ............ '" ''-."-' '.:"' l,' ,.'," i --',""- ...... ..-..' : ." ; . ':- -. .... - . · · BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 04, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton Well Fawn Lake #1 Enclosed, in duplicate, is form 10-407, our Report of Well Completion for the above named well. This information reflects the current condition and status of the well. Also enclosed are all items listed on the transmittal form. Yourq ver~ [ruly, /¢' G. Vidrine !Drilling Engineering JGV/KMT Supervisor cc: J. Wicks/Exploration Well File APR - 5 1990 'Alasl(a.Oil & Gas Cons. Oomm~ss'to~ /~nchOrage EXPLORATION (ALASKA) RO. BOX 6612 ANCHORAGE, ALASKA 99502-0612 ANCHORAGE OFFICE: 900 EAST BENSON BLVD. · ANCHORAGE, ALASKA 99502-0612 · (907) 561-5111 TO: Alaska Oil & Gas Conservation Comm. ORIGINATOR: Thomas/Wicks 3001 Porcupine Dr. Anchorage, AK 99501 ATTENTION' C.v. Chatterton DATE SENT: April 04, 1990 The following material is being transmitted herewith. Please acknowledge receipt by signing below and returning a copy of this letter: · (!) print and (1) sepia of the.following logs: Phase/In ..... ion SFL. Array Sonic STC, Compensated Neutron-Litho-Den y, Natural Gamma Ray Spectrometry, RFT Runs ~_~) print of the mudlog ~/ .... (1) LIS tape containing all digital log data in the well ~~ ~/~8 Conventional Core Analysis from the following depths: 7682'-7683' & 7683'-7736' Sidewall Core Analysis (2) copies of daily drilling reports ~,~~.( ."Z'~'-~ /~ ~ (2) copies of the Teleco Directional Survey ~-~~/ ,~ /~-Fz~':~ · Core Chips from 1 foot intervals from the following depths: 768~'-7736' ~n~: ........ ~"~ questions ....... --..~-~.~..~ gcclogic ~=~= _please contact John Wicks @ 564-5393 Questions concerning other submitted data shou~ go to Karen Thomas @ 564-4305 Received by: AK 2233-2 (3/89) STATE OF ALASKA ALAS~ OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classificatio~f ~n,~ervice Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 90-13 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5o- 029-22007 ; ......... 9. Unit or Le~e Name 4. Location of well at surface .~:./~'~ ~:~;~.? ~ ~ C~.~, ~ ~,'~" Fawn L~e 2250' FNL, 2100' FWL, SEC. 25, T12, R13E, UM ~ /~ ~ ~ At Top Producing Interval- '---~.., ~;~/~'~'7~O~ ; ~:~;:.:~?~¢,:~ ~ 10. Well Number , ~ ~ FawnLako~l Same ; ~ ...... ~ ,,___~ 11. Field and Pool At Total Depth ......... ~;:;,~, ~._;;~ ~ .~ Wildcat 5. Elevation in feet (indi~te KB, DF, etc.) ~6. Lease Designation and Serial No. KBE = 52. 90 ~ ADL 28277 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. ~15. Water Depth, if offshore ~16. No. of Completions 02-04-90 02-17-90 ~I n/a feet MSL I none 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+~D) 19. Directional Survey ~20. Depth where SSSV set 21. Thickness of Permafrost 8360'MD/8360' TVD none ~ D ~ DI none feet MD 1800' ~ 100' 22. Type Electric or Other Logs Run Di~SONIC/MSF~GR, LD T/CN~NG ~ MC T/GR, Sidewall Corns, RF~ FMS/G~AMS, VSP. 23. CASING, LINER AND CEMENTI~ R~RD S~I~ DEP~ MD CASING SIZE ~. PER ~. G~DE TOP ~ ~E SIZE CEM~I~ R~RD AMOUNT PULLED 20" 133~ K-55 Sudace 104' 26" 300 Sx Amticset II 13-3/8" 72~ L-80 Sudace 2691' 2691' 3806 cufl Ar~icset II 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBI~ R~ORD interval, size and number) SIZE DEP~ S~ (MD) PACKER S~ (MD) none no tubing none 26. ACID, F~CTURE, CEMENT SOUE~E, ~C. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL ~ED 8360'-7860'(500~ 244 CUfl Class G Cement 8063'-7300' (763~ 356 cufl Class G Cement 2800'-2500' (300~ 151 cufl Arctic Set I Cement 150 ~ O' (150 ~ 125 cufl Arctic Set I Cement 27. PR~TI~ TEST Date First Production ~Method of Operation (Flowing, g~ lift, etc.) none I N/A Date of Test Hours Tested PROD~TI~ ~R OIL-BBL ~S-MCF ~ATER-BBL ~E~ ]GAS-OIL ~TIO TEST PERIOD ~ I Flow Tubing C~ing Pressure SALCU~TED OIL-BBL ~S-MCF ~ATER-BBL OIL G~VITY-API (corr) Press. 24-HOUR ~TE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presen~ of oil, gas or water. Submit core chips. ~re ~1 - 7682~ 7683' - Sitst, m gy, weft ~nsol, q~ose, tr ca~on debris, no vis ~ros~y; and Sh, dk gy. ~re~2-7683~7736~-9~dip~Sst~tbrn~s~ty~we~ns~-fgrn~p~rvisp~r~sity~tr~i~stn~ Sgst, m ~ woll conso~ q~oso, no u[s ShOo, m~R ~g, nchOrag Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS ~la~l~lt~t~l~l~ t .~TION TESTS , NAMEM -F~ Include interval tested, pressure data, all fluids recovered and gravity, ,, .~ . DEPTH TRUE VERT. DEPTH GOR, and time of each phase. ~. ~ ~"z1596' WS/ Ugnu "~ 4596' HRZ i~,.~ .~,: .~ ~!i:, 7845' 7845' LOWER SHALE 7905' 7905' KINGAK 8249' 8249' 31. LIST OF ATTACHMENTS , , , 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,./ - ~ Title PBU Lead Enc~ineer Date -- INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Monday, February 5, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day' 1 Depth at 0600 Hrs. = 589 24 Hour Footage = 485 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $539,072 Current Operation: Tripping. Summary of Last 24 Hours: Move rig to Fawn Lake #1. Accept rig on well at 1400 hours on 2/4/90. Spud well at 1900 hrs on 2/4/90. Drilling 17-1/2" hole. Wells Shut-in For Drill-By: Mud Type Mud Weight Viscosity p V yP, Fluid Loss Solids Temp Spud 8.8 #/gal 180 Sec. 27 50 12.3 cc 4% 53 °F Survey Depth Angle Direction N-S E-W Dog Leg TVD. Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Monday, February 5, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day: 1 Depth at 0600 Hrs. = 589 24 Hour Footage = 485 AP! No. AFE Number: AFE Amount = Current Field Costs = 50-029-220O7 684645 $5,142,000 $539,072 Current Operation: Tripping. Summary of Last 24 Hours: Move rig to Fawn Lake #1. Accept rig on well at 1400 hours on 2/4/90. Spud well at 1900 hrs on 2/4/90. Drilling 17-1/2" hole. Wells Shut-in For Drill-By: MudType Mud Weight Viscosity P V Y.P.. Fluid LOSS Solids Temp Spud 8.8 #/gal 180 Sec. 27 50 12.3 cc 4% 53 °F Survey Depth Angle Direction TVD N-S E-W Doa Lea Section Coordinate Coordinate °/JO0' Reviewed By: ,/~z~ BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Tuesday, February 6, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day: 2 Depth at 0600 Hrs. = 2,100 24 Hour Footage = 1,511 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $571,917 Current Operation' Drilling 17-1/2" hole at 2100' Summary of Last 24 Hours' Drill and survey. Rig up Exlog RPM counter. Wells Shut-in For Drill-By: N/A Mud Type M~d Weight Viscosity p V YP. Spud 9.3 #/gal 1 50 Sec. 34 47 Fluid Loss Solids 14.0 cc 76~% Temp 54 °F Survey Depth Angle 1 500 0.75 2 1,000 0.50 3 1,5OO O.5O 4 2,000 O.50 Direction TVD N-S E-W Section (~oordinate Coordinate Dog Leg 21100' Reviewed By: Mike Miflcr "~ £ )'1.4 BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Wednesday, February 7, 1990 WELL: Fawn Lake #1 WILDCAT - CONFIDENTIAL RIG: Nabors Rig #18-E Day: 3 Depth at 0600 Hrs. = 2,700 24 Hour Footage = 600 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $656,426 Current Operation: Rig down cementers Summary of Last 24 Hours: Drill and survey to 2700' TD. Run 68 jts. 13-3/8" casing to 2691'. Run 5" drill pipe, stab in, and cement casing with 3540 sx of Arcticset II cement. CIP 0600 hrs. 2/7/90. Wells Shut-in For Drill-By: N/A MudType . Mud Weight Spud 9.7 Cf/gal Viscosity 180 Sec. PV YP Fluid Loss ~ Temp 1 4 35 14.0 cc '~ 56 °F Survey Depth Angle Direction 5 2,500 0.50 .TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: .Mike Miller BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Thursday, February 8, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day: 4 Depth at 0600 Hrs. = 2,700 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $864,434 Current Operation: Summary of Last 24 Hours: Wells Shut-in For Drill-By: Testing BOP POH with drill pipe. Clear floor and clean pits. Nipple down diverter and riser. Install wellhead. Nipple up BOP. Install test plug and test BOP, N/A Mud Tvoe - . Low solids Mud Weight Viscosity P V .yP Fluid Loss Solids Temp 8.9 #/gal 3 5 Sec. 3 5 1 3.5 cc 4 % °F Survey Deoth Angle Direction N-$ E-W Dog Leg T.VD Section Coordinate Coordinate °/100' Reviewed By: Mike Miflcr"~ ~ BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Friday, February 9, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day: 5 Depth at 0600 Hrs. - 4,1 8 6 24 Hour Footage = 1,486 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $908,507 Current Operation' Drilling 8-1/2" hole at 4186' Summary of Last 24 Hours: Finish BOP test. RIH with 12-1/4" bit, tag cement at 2565'. Drill cement to float collar at 2650'. Casing tested to 3000 psi. Drill cement and shoe to 2700'. Drill new hole to 2720'. Perform LOT to 14.5 ppg. POH. RIH with 8-1/2" bit & Teleco. Drill 8-1/2" hole to 4186'. Wells Shut-in For Drill-By: N/A MudType Mud Weight Viscosity P V YP. Fluid Loss Solids Temp Low solids 9.1 Cf/gal 3 6 Sec. 7 I 2 1 6.0 cc 6 % 6 2 °F Survey Depth Angle Direction TVD 6 4,1 86 0.20 N-$ E-W Section ,Coordinate Coordinate Dog Leg °/100' Reviewed By: Mike Mifler BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Saturday, February 10, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day: 6 Depth at 0600 Hrs. = 5,1 32 24 Hour Footage = 94 6 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $955,963 Current Operation' Tripping for bit Summary of Last 24 Hours' Trip for bit. Wells Shut-in For Drill-By: N/A RIH. Drill with bit No. 6 to 5132'. Trip for bit. .Mud Type Gel/Resinex Mud Weight 9.3 #/gal Viscosity 3 6 Sec. PV Yp Fluid Loss Solids Temp 7 9 11.0 cc 7% 74 °F Survey Depth Anale 7 5,066 0.20 5,639 1.00 Direction TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: Mike Miller BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Sunday, February 11, 1990 WELL: Fawn Lake #1 WILDCAT - RIG' Nabors CONFIDENTIAL Rig #18-E Day: 7 Depth at 0600 Hrs. = 5,9 51 24 Hour Footage = 81 9 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $994,196 Current Operation' Drilling at 5951' Summary of Last 24 Hours' RIH. Drill with bit No. 7 to 5639'. Wells Shut-in For Drill-By: N/A Trip for bit. Drill ahead. Mud Type Mud Weight ..Viscosity P V gel/resinex 9.4 fi/gal 36 Sec. 6 YP IEJjALd_LEs~ Solids Temp 9 9.0 cc 8% 65 °F Survey Deoth An(]le - _ 8 5,730 0.70 9 5,824 0.70 Direction ,TVD N-S E-W Dog Leg, SectiQn Coordinate Coordinate °/100' Reviewed By: Mike Miller BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Monday, February 12, WELL: Fawn Lake #1 Day: 8 Depth at 0600 Hrs. = 6,810 24 Hour Footage = 8 5 9 EXPLORATION 1990 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $1,037,517 Current Operation' Drilling at 6810'. Summary of Last 24 Hours' Drill to 6364'. Wells Shut-in For Drill-By: N/A Trip for bit. Drill ahead at 6810'. Mud Type Mud Weight gel/resinex 9.5 #/gal Viscosity 3 8 Sec. PV .YP Fluid Loss Solids 5 I 2 8.0 cc 8.5% '['emp 75°F .~ Deoth Angle 6,364 0.50 10 6,614 0.60 I I 6,709 0.80 Direction TVD N-$ E-W Section Coordinate Coordinate Dog Leg 01100, Reviewed By: Mike Miller BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Tuesday, February 13, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day: 9 Depth at 0600 Hrs. = 7,280 24 Hour Footage = 47 0 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $1,065,978 Current Operation' Drilling at 7280'. Summary of Last 24 Hours' Drill with bit No. 9 to 7006'. collar. Drill ahead. Wells Shut-in For Drill-By: N/A Trip for bit, change out Teleco Mud Type Mud Weight Viscosity P V Gel/ Resinex 9.6 #/gal 3 7 Sec. 9 YP Fluid Loss Solids Temp 10 8.0 cc 9.5% 73°F Survey Depth Angle Direction TVD I 2 7,152 0.30 N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: Mike Mifler -?~'t 4. 3J~,'~ BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Wednesday, February 14, 1990 WELL: Fawn Lake #1 WILDCAT- CONFIDENTIAL RIG: Nabors Rig #18-E Day: I 0 Depth at 0600 Hrs. = 7,6 82 24 Hour Footage = 4 0 2 AP! No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $1,102,799 Current Operation' Change core catcher Summary of Last 24 Hours: Drill to 7682'. CBU for samples. POH. Pick up core barrel. RIH. Start cutting core #1 at 7682', barrel jammed. POH. Recovered approximately 1' broken core. Check barrel and change catcher. Wells Shut-in For Drill-By: N/A MudType Mud Weight Viscosity pv YP Fluid Loss Solids Temp gel resinex 9.8#/gal 39Sec. 8 13 6.4cc 10.5% 75°F ,,, Survey Depth Angle Direction -I-VD I 3 7,626 0.50 N-S E-W Dog Leg Section Coordin~,te Coordinate °/100' Reviewed By: Mike Miller'7/¢/l¢")l.,,,. BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Thursday, February 15, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day' I 1 Depth at 0600 Hrs. = 7,8 90 24 Hour Footage = 20 8 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $1,179,657 Current Operation' Drilling Summary of Last 24 Hours: RIH with core barrel. Cut core #2- 7682' to 7736' (54'), jammed. POH, recovered 54' of core. RIH with drilling assembly. Log across core run (7683'- 7736') with Teleco MWD. Drill ahead. Wells Shut-in For Drill-By: N/A .Mud Type gel/resinex Mud Weioht Viscosity P V YP Fluid Loss Solids TemD -- 9.8 #/gal 3 7 Sec. 7 6 6.4 cc 1 0.5% 7 5 °F Survey Depth Angle Direction TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: Mike Miller BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Friday, February 16, 1990 WELL: Fawn Lake #1 WILDCAT- CONFIDENTIAL RIG: Nabors Rig #18-E Day: I 2 Depth at 0600 Hrs. = 8,31 0 24 Hour Footage = 4 2 0 APl No. AFE Number: AFE Amount = Current Field Costs = 5O-O29-22OO7 684645 $5,142,000 $1,212,326 Current Operation: Drilling at 8310' Summary of Last 24 Hours: Drill to 7941'. CBU for samples. Drill to 8199'. POH. up, lay down core barrel. RIH with drilling assembly. ahead. Wells Shut-in For Drill-By: N/A Pick Drill MudType Mud Weight Viscosity P V YP. Fluid Loss Solids TemD gel/resinex 9,9 #/gal 35 Sec. 9 7 6.4 cc 11.5% °F Survey Deoth Anale Direction TVD 14 8,259 O.70 N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: MIKE MILLER'`cA BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Saturday, February 17, 1990 WELL: Fawn Lake #1 WILDCAT - CONFIDENTIAL RIG: Nabors Rig #18-E Day: I 3 Depth at 0600 Hrs. = 8,360 24 Hour Footage = 5 0 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $1,293,459 Current Operation' Logging Summary of Last 24 Hours' Drill to 8360' TD. Circulate and short trip. Schlumberger and run- Run 1- DIL/SONIC/MSFL/GR Run 2: LDT/CNL/NGT Wells Shut-in For Drill-By: N/A POH. Rig up Mud Type Mud Weight Viscosity P V gel/resinex 10.1 #/gal 38 Sec. I I YP, Fluid Loss Solids 7 6.4 cc 1 2% Temp 73 °F Survey Depth Angle Directi0.n TVD N-S E-W Section Coordinate Coordinate Dog Leg o/100' Reviewed By: Mike Miller ~ ~r,-.t_ BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Sunday, February 18, 1990 WELL: Fawn Lake #1 WILDCAT - CONFIDENTIAL RIG: Nabors Rig #18-E Day: I 4 Depth at 0600 Hrs. = 8,3 60 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $1,377,929 Current Operation' Logging Summary of Last 24 Hours: Logging run #2: LDT/CNL/NGT. Test BOP. RIH with drill pipe. Wash and ream 8310' to 8360'. CBU 1-1/2 times. PQH for logs. Rig up and run #3: GR/MCT, MCT failure. Rerun MCT/GR. Wells Shut-in For Drill-By: Mud Tvoe - . gel/resinex Mud Weight Viscosity p V YP Fluid Loss Solids 10.0#/gal 38Sec. 9 7 6.2cc 12% Temo 66 OF Survey Depth Angle 8,325 0.80 Direction ,TVD N-S. E-W Section Coordinate Coordinate Dog Leg o/100' Reviewed By: Mike Miller BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Monday, February 19, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day: I 5 Depth at 0600 Hrs. = 8,3 60 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $1,501,761 Current Operation: Logging Summary of Last 24 Hours: Complete run #3: MCT/GR Run #4- Sidewall cores Run #5' RFT Run #6: FMS/GR/AMS Wells Shut-in For Drill-By: N/A Mud Type Mud Weight Viscosity P V gel/resinex 1 0.0 #/gal 3 7 Sec. 8 .YP. Fluid Loss Solids Temp 6 6.4 cc 11.5% 62°F Survey Deoth Anale Direction TVD N-S E-W Dog Leg. Section Coordinate Co(;;)rdin~te °/100' Reviewed By: Mike Miller BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Tuesday, February 20, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day: I 6 Depth at 0600 Hrs. = 8,3 60 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Costs = 5O-O29-22OO7 684645 $5,142,000 $1,531,645 Current Operation: Logging VSP Summary of Last 24 Hours: Finish logging run #6: FMS/GR/AMS. Rig down Schlumberger. RIH with drill pipe, wash and ream 8232' to 8360' (tight and packing off). Circulate and POH. Rig up and run VSP. Tool failure, change tools. Run #7: VSP. Wells Shut-in For Drill-By: Mud Type gel/resinex Mud Weiaht Viscosity P V yP Fluid Loss Solids TemD 10.1#/gal 43Sec. 10 10 5.8cc 12% 58°F Survey Deoth Angle Direction N-S E-W Dog Leg TVD, Section Coordinate Coordinate °/100' Reviewed By: Mike Miflcr BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Wednesday, February 21, 1990 WELL: Fawn Lake #1 Day: 1 7 Depth at 0600 Hrs. = 8,360 24 Hour Footage = 0 WILDCAT - CONFIDENTIAL RIG: Nabors Rig #18-E APl No. 50-029-22007 AFE Number: AFE Amount = Current Field Costs = 684645 $5,142,000 $1,562,385 Current Operation: Summary of Last 24 Houm: Wells Shut-in For Drill-By: RIH with drill pipe to plug Finish logging run #7: VSP. Run #8: RFT. RIH with drill pipe to 8360'. Circulate. POH. Lay down BHA. Pick up plug catcher and RIH with drill pipe to plug. Mud Tvoe - . gel/resinex Survey Deoth Anale - _ Mud Weiaht Viscosity P¥ YP ~ Solids TemD 10.1#/gal 46Sec. 9 12 5.8cc 12% 62°F Direction TVD N-S E-W Doa Lea Section Coordinate Coordinate °/100' Reviewed By: Mike Miller BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION WILDCAT- CONFIDENTIAL As of 0600 Hrs. Thursday, February 22, 1990 WELL: Fawn Lake #1 RIG: Nabors Rig #18-E Day: I 8 Depth at 0600 Hrs. = 8,3 60 24 Hour Footage = 0 AP! No. 50-029-22007 AFE Number: 684645 AFE Amount = $5,142,000 Current Field Costs = $1,831,1 26 Current Operation' POH, laying down drill pipe Summary of Last 24 Hours: RIH to 8360'. pumped 43 bbls of cement. POH. RIH, tagged top of cement at 8063'. Pumped 64 bbls of cement. POH, lay down 14 jts 3-1/2" drill pipe. RIH, tag cement top at 7200'. POH, lay down 5" drill pipe. (total open hole cemented interval: 7200' - 8360') Wells Shut-in For Drill-By: MudType Mud Weight Viscosity P V YP Fluid LOss. Solids Temp gel/resinex 9.8 #/gal 5 1 Sec. I I 1 4 1 4.8 cc 1 0.5% 5 8 °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate. Coordinate. °/100' Reviewed By: Mike Mifler BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Friday, February 23, 1990 WELL: Fawn Lake #1 WILDCAT - CONFIDENTIAL RIG: Nabors Rig #18-E Day: I 9 Depth at 0600 Hrs. = 8,3 6 0 24 Hour Footage = 0 APl No. 50-029-22007 AFE Number: 684645 AFE Amount = $5,142,000 Current Field Costs = $1,877,805 Current Operation: Laying down drill pipe Summary of Last 24 Hours: POH, lay down drill pipe. RIH to 2800'. Pump 35.5 bbls of Arcticset I cement. POH, lay down 3-1/2" drill pipe. RIH, tag cement top at 2520'. POH. Nipple down BOP, remove wellhead. Lay down drill pipe. Prepare to lay top plug. Wells Shut-in For Drill-By: MudType Mud Weight Viscosity p v. YP Fluid Loss Solids Temp gel/resinex fi/gal Sec. cc °F Survey Deoth Angle Direction N-S.. E-W Dog Leg TVD Section Coordinate Coordinate °/100, f. Reviewed By: Mike Miller'~'~~'~~ BP EXPLORATION DAILY DRILLING REPORT: EXPLORATION As of 0600 Hrs. Saturday, February 24, 1990 WELL: Fawn Lake #1 WILDCAT - RIG: Nabors CONFIDENTIAL Rig #18-E Day: 2 0 Depth at 0600 Hrs. = 8,360 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22007 684645 $5,142,000 $1,948,413 Current Operation' Summary of Last 24 Hours: Rig Released Cemented top 150' inside 13-3/8" casing with Arcticset I cement. Install well identification marker. Clean area. Release rig at 1800 hours 2/23/90. FINAL REPORT Wells Shut-in For Drill-By:- ,, Mud Type ,Mud Weight Viscosity PV. YP Fluid Loss Solids Temp Cf/gal Sec. cc °F Survey ,Depth Angle Direction N-S E-W Dog Leg TVD. Section ,Coordinate Coordinate_ °/1.00' Reviewed By: Mike Miller A~ach: Caman~ers Job Sum=a. ry Pressure Charts O~her Con~rac~or's Job Summaries CEMENTING $ LLM/TARY WELL RIG REQUIK~ PLUG LENGTH: FROM ._ ~0,0 ' UP TO cancun^'r~:o CEa~:NT vor.,u~S: , ,, /.~-~ CU.Fr. ( WITH OPEN E~ DRILL ' ( ._~oo '). sx.) + Z~' ~ sx.). MIN. PRE-WASH DIS~LACF_D CElW. F.2Fr WITR ADDITIVES PPG BPM AND _ HRS. THICK TIME, BBLS. OF I"/ ,~,~_ .. /~"~. ,! STA~TSD ~ixz~o cs~T a~_ /~0 ~s. Z~/~ ~ PSI. DISPLACED AT A ~TE LLPIPE WAS AFTER DISPLACING. PULLED /~ STANDS OF PIPE, CALC~AT~ CmENT TOP AT ........ /_~l~ ..... HRS. PULL~ DRILLPIPE TO WAS OUT OF COMiMENTS: ~ _ i ................. ,, · Attach · ~e...~n:or~_ ~ Job Summary Pressure Chares Other Contractor's Job Sum~.arle$ SUPERVISOR Ck-XfENTING S UM1Ta3,Y PLUG JOB ,, WELL RIG , LAST CASING_ , .,/._'~__~_A~____~-"@ REQUIRED PLUG LENGTH: FROM. ~~ /)' ' UP TO ~~ 0 CALCULATED CEMENT VOLUM£: ......... /P.f CU,FT, ( /'~/ EXCESS, TOTAL CLMENT USED WAS ~'~ ~/~ CU.FT. (. WITH OPEN END DRILL PIPE AT ' CIRCULATED ' (,_.G'cp '). ~,~ +,~ 3_¥ ~. ,2/O sx.). PRE-WASH cu.~'T. ( ~/~j s×.) OF ¢~ENT, WITH ADDITIVE5 PPG · HRS, THICK TIME. DISPLACED C~.ENT WITH AT A RATE OF ,-~ .... ~.- ._ BPM AND / O~3 STAi{TgD MIXING CEMENT AT 0 7.V~ HR$, PSI. DISPLACED AT A RATE /~ S~:A~S OF COM/4EI~T $: DRILLPIPE WAS WET/DRY AFTER DISPLACING. pULLED AND WAS OUT OF CALCULATED CEMENT TOP AT ~,~_/'5 HRS. PULLED DRILLPIPE TO , .~ c~,~of%~.~:~' .... 7~ o , ~ C,'~ ~.? ?F- --- ~~' ~~-~ ~ ~" ~ ' Cement'=rs Job Summary Pressure Charts O~her Con~ra¢~or'~ Job Sum. maries PACRLog V~lu~ 4 : TIME V~L. I V~L.~ V~L. 3 V~L, 4 VOLUME 50 8.~0 0,~3 0,~ ~o 8,43 :. :.0,.04 0.4 ~0 0 0 0,4 ~ 0 0 0.4 0~:40 ~ ~ o 0.4 ~0 0 0 0,4 ~o o 0 0,4 ~0 · 0 0,4 50 0 0 0.4 ~0 0 0 0,4 ~0 0 0 50 O 0 ~0 0 0 0,4 60 0 0 50 0 0 ~0 O 0 0 0 0 0 ~.,~ 0.4 8.4 0,4 8,4 ~,4 8.4 8.4 8.4 0,4 ~,4 PACRI_og Sec > TIME V~L. 1 V~L,2 V~,3 V~.~ VOLUME 1~:o? 18 5.88 o ~ 0 13:17 0 8,52 · 0 0 ~T~RT PUMPIN~ W~T~R 13:18 1J:22 ~o 8.~8 · 40 1~.o ~0 8.~2 0.2? 110 10,8 1J:~3 890 8.~1 8 1~3B ~0. 1 1~:24 70 8.52 0 ~ 10,1 160 8.~3 4.0~ 298 14,5 RE~ET VOLUME 1~:27 48 8.~3 0,47 1~0 18. I 8~ 8.40 ~ lo~ 0 13:29 ?~ '9.84 8 108 0 12~ 1~.61 2.41 ~4~ 2.6 5~ 1~.9~ 3.13 ~38 1~.3 40 1~,8~ 3,14 ~18 17,~ ~ 16.31 3.~3 28~ 22.8 ~0 1~.~2 3.~3 ~0 28. 1 RESET VOLUME DROP TOP PLU~ 1~:4~ 0 1~.47 0 4~ 0 ~T~RT QI~PI~OEMENT ~T~RT PUMPIHG 0 8.~ ~.46 98 1.4 13:44 ~Z 8.6~ 0.25 ~ 1.8 RI~ PUMP~ Tn nt~m~ ~ 13; 4,4 140 ~.91 ~ 28 3~ 8.4? · 30 ..~ ~.0~ 0 ~8 ~E~L-TIME MOD[ - OZL UNZT~ 2,! 2.1 Z,l 2.1 2,1 2,1 PLAYBACK MODE - OIL UNITS FEB-2~-'9~ 09:5~ ID:B~-~RIG 18E PACt: I..og T~o ~o~.,~,~. :~]~.:~: -~-~ .... ~'~ .... ~,~..~- __c]~.~~: 1111 ............... : V~I~ 4 ; U~it 1 P~ume Vol,~me i~ compubed ~om : gni~ I To~I Flow r~e TIME VAL. 1 VRL.~ V~L,3 VAL, 4 VOLUME (PSI) CppG> <BPM) (PSI> <GBL> ~*~ 8.~6 1.23 16~ 8.9 260 8.2? 07:~4 ~ 8,62 R~SET VOLU~E ~ 1~.7~ 1, 1~ START ~M~NT ~LURR¥ 00:0~ ~ 1~.~9 0~; 15 %~% 16.80 *~ 16.17 RESET VOLUM~ 08:17 ~ 15.~1 DR~p TOP PLUG OG: ~? ~ 15.90 START DISPL~c~M;NT 0 148 el 780 8 1070 1fei lO.2 478 1 ~. 0 150 16. 0 1:38 8 220 0 ~,93 780 4.8 4.19 ~6B 8.5 1.~2 198 11.9 8.98 168 13.4 3,11 330 18,6 3.26 278 ~,24 ~70 2~,3 3,24 2801 34.6 3.2? 27~ 3,27 268 4~.4 8.18 0.02 46. ? 80 ~ 4 6.8 1. 9 ~: 19 ~ 8.?~ 0.1~ ~0 2.8 ~ 8,~ · ~0 2,~ ,~ 8.~5 0 50 Value I ; Unib I Pressk4r'e Value 4 ; Disabled Volt,me $~ computed Prom : ~c~n Period (~ec) ; TIME V~L, 1 V~L. ~ VRL, 3 V~L. 4 VOLUME Volum~ is com~uted ?~om : 1 To~! Flo~ p~e Time : Recot-din9 R~ is 4 TIME V~L. I VRL. 2 V~L. 3 VRL,~ 1'9:2~ ~ 8.38 · 118 19:2~ ~ 8.37 1.4f 160 · ~ 8.~3 1,.43 178 · ~ 8.3~ 4,40 ?00 40 8.~0 4,8~ 810 PRESSLIRE T~ST LINE~ HOLDING PRE~$URE 1~:2~ 1230 '8,47 0 1980 19:38 480 8.42 O 1160 START PUMPIH~ ~TER 19:30 ~ 8.46 ' 8 190 · ~ 8,~ 2.01 190 ?~ G.4~ 4.40 790 RE~ET volurl£ 19:32 ~ 8.41 8 250 START GEMENT SLURRY *~ 1~.97 4,31 738 *~* 1&,21 4.38 770 ~ 16,19 ~.47 318 19;40 ~ 1~.8~ 2.~ 250 ~; 16.89 3,83 318 VOLUME (E1BL > 0 0.2 8..~ 8.4 10,8 10,8 10,1 18,1 10.1 10,1 10, mS 13. "3 1~.1 0 8.1 3,0 7,9 18,5 19,9 22. 9 26. :> 29, 3 32, 3 · ~ 1~, 27 ~. 0~ 310 · *~ 1~.09 3.74 378 19:3~ **~ 16,8~ 3.32 338 · ** 15.2~ 2,?& 238 ~£SET VOLUME DROP TOP 19:53 *** 15.~4 0 120 STRRT 19:53 *** l~.Zl 0 118 STRUT PUHPIH~ 19:~3 *~* 1~.21 ~ 110 ~HLITOO~N 19:~ ~. ~,G~ 0,82 130 RZ~ PUMP~ TO DZ~PL~C:~ *** ~.~0 0 100 4~0 5.03 0 90 20:10 438 5,80 0 90 440 ~.88 8 108 20:12 ~ ~.80 0 90 END JOB R£RL-TIM[ MODE - OIL UHZTS 44. 47. ~1. 54. ~1. &3. ~4. 0 2,0 2 8 2 0 2 8 2.0 2.8 2,0 2.0 2,0 2.0 2,0 2,8 CEMENT MODE PLaYBaCK MODE - OIL UNIT8 B.P. EXPLORATION ALASI~ INC. WELL: FAWN LAKE It FIELD: WILDCAT ROUTINE CORE ANALYSIS MARCH 1990 FILE 70075 ICROFILMED 12051 RIVERA RD. * SANTA FE SPRINGS, CA 90670-2289 TELEPHONE (213) 698-0081 · PANAFAX (213) 693-0947 March 26, 1990 Mr. Douglas Dickey B. P. Exploration Alaska Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Dear Mr. Dickey: Re: Core Analysis File No.: 70075 Enclosed is a final core analysis report for routine core analysis tests performed on material from the Wildcat Fawn Lake #1 well. Laboratory procedures have been included for your reference. We appreciate this opportunity to be of service and trust these data prove beneficial to the development of this reservoir. Sincerely, Petroleum Testing Service, Inc.  P eter T. Schuyler President PTS:rdl Encl. PETROLEUM TESTING SERVICE, INC. Client: ARCO Alaska, Inc. File: 70075 Date: March 1990 Well: Fawn Lake #1 Field: Wildcat State: Alaska ROUTINE CORE ANALYSIS 1. Drill 1" diameter plug and trim to right cylinder. 2. Extract water and hydrocarbons from sample using Dean-Stark toluene method. Record produced water volume. 3. Vacuum dry at 150°F until weight is stable. Allow sample to cool and weigh to the nearest 0.01 gram. 4. Measure bulk volume using mercury immersion method. 5. Measure sand grain volume using a Boyle's Law helium porosimeter. Calculate porosity, saturations, and grain density. 6. Mount sample in a hydrostatic Hassler-type sleeve using a confining stress of 300 psi. 7. Measure permeability with nitrogen gas using a calibrated flow tube-type permeameter. PETROLEUM TESTING SERVICE, INC. Page No. FiLe No. Date 1 7O075 March 27, 1990 CONPANY CORE TYPE MUO TYPE BRITISH PETROLEUM EXPLORATION ALASKA 4 INCH FIBERGLASS SLEEVE AIR HELItJM PERMEABILITY DEPTH POROSITY md. O/W ft. PERCENT HORZ. VERT. RATIO 7686.5 12.1 <0.1 0.39 7687.6 11.5 <0.1 0.41 7689.4 15.5 <0.1 O. 85 7689.7 12.9 <0.1 0.15 7691.85 14.7 0.3 0.29 CORE ANALYSIS APPARENT OIL WATER TOTAL SAND GRA! N SATN SATN SATN DENS ! TY XPV XPV XPV gm/cc .... ...o. ..... 27.2 69.9 97.1 2.71 26.9 65.2 92.1 2.71 14.7 17.2 31.9 2.66 12.1 80.4 92.5 2.69 22.3 77.6 99.9 2.65 7692.7 10.0 <0.1 0.39 25.2 64.9 7696.6 15.2 0.6 0.21 16.6 79.5 7697.4 12.5 3.1 0.51 27.5 53.6 7698.25 12.7 1.1 0.45 24.0 53.3 7698.35 14.4 2.7 0.12 9.6 83.8 7699.2 15.5 O. 1 0.24 7700.2 15.2 <0.1 0.01 7701.35 15.4 5.1 0.24 7702.9 15.1 0.2 0.18 0.53 0.14 7703.7 14.8 6.0 7704.1 7704.2 13.8 <0.1 18.5 0.9 18.5 14.7 33.4 12.2 77.7 87.3 75.8 82.5 87.6 <0.1 90.1 96.1 81.1 77.3 93.4 96.2 88.2 94.3 97.2 2.65 2.65 2.68 2.62 2.59 2.62 2.69 2.69 2.68 2.67 UELL FAWN LAKE #1 FIELD WILDCAT COUNTY STATE ALASKA LITHOLOGY Sttst; stt-vfsd, carb Lam, pyr, wt cmt, fnt odor, tt stn, gtd fluor Sttst; stt-vfsd, carb, pyr, wt cmt, fnt odor, tt stn, gLd fluor Sst; vf-fsd, carb, fnt odor, tt stn, gtd fluor Sst; vf-fsd, carb Lam, wt cmt, fnt odor, tt stn, gtd fluor Sst; vf-fsd, cty, carb Lam, ~t cmL, fnt odor, tt stn, strk gtd fLuor Sst; vfsd, cty, wt cmt, fnt odor, tt stn, gtd fLuor Sst; vf-fsd, cty, carb ta~, wt cmt, fnt odor, tt stn, gtd fLuor Sst; vf-fsd, cry, carb Lam, ~L cmt, fnt odor, Lt stn, gLd fluor SLtst; sLt-vfsd, carb, ~L cmL, fnt odor, it stn, gLd fluor SLtst; cL-stt, carb Lam, ~L cmt, fnt odor, Lt stn, gLd fluor Sst; vf-fsd, carb Lam, wt cmt, fnt odor, tt stn, sptd gtd fluor Sst; oLv gry, cL-vfsd, ~L cmt, pyr, fnt odor, Lt stn, sptd gLd fluor Sst; vf-fsd ~/cL Lam, carb, ~L cmt, fnt odor, Lt stn, strk gLd fluor Sitst; ci-sLt, carb Lam, pyr, ~L cmt, fnt odor, Lt stn, sptd gid fluor Sttst; ct-stt, pyr, wt c~t, fnt odor, tt stn, strk gtd fluor Sst; cL-fsd, carb Lam, wt cmt, fnt odor, strk tt stn, strk gtd fluor PETROLEUM TEST]NG SERVICE, INC. Page No. FiLe No. Date 2 70075 March 27, 1990 CONPANY CORE TYPE MUD TYPE BRITISH PETROLEUI4 EXPLORATION ALASKA 4 INCH FIBERGLASS SLEEVE CORE ANALYSIS AIR HELIUH PERNEABILITY OIL MATER TOTAL DEPTH POROSITY Ind. O/U SATN SATN SATN ft. PERCENT HORZ. VERT. RATIO ~:~V XPV 770~.5 14.0 22. 0.09 7.1 78.2 85.3 7705.45 12.0 <0.1 0.01 0.6 74.3 74.9 7706.85 13.4 0.1 0.01 1.0 90.7 91.7 7707.2 12.9 0.2 0.00 0.0 90.8 90.8 7710.1 14.1 0.1 0.11 10.2 89.8 100.0 7710.1 <0.1 7720.75 15.3 0.1 * 0.08 7.2 90.2 97.4 7723.5 14.5 0.2 0.30 18.0 59.9 77.9 7724.2 15.2 0.2 0.18 15.0 85.0 100.0 7725.4 14.9 0.9 0.19 13.1 67.9 81.0 7726.6 16.8 0.3 0.17 11.7 69.9 81.6 7727.4 16.3 1.4 O.Z~ 18.0 79.0 97.0 7728.4 15.9 <0.1 0.20 16.3 8:3.2 99.5 7729.85 15.1 0.1 0.00 0.0 77.5 77.5 7730.65 14.9 0.2 0.20 12.8 64.6 77.4 APPARENT SAND GRAIN DENSITY gm/cc 2.69 2.66 2.68 2.73 2.~8 2.68 2.~ 2.70 2.66 2.71 2.71 2.67 UELL FAgN LAKE #1 FIELD UILDCAT COUNTY STATE ALASKA LITHOLOGY Sst; oLv gry, cL-vfsd, uL cat, pyr, fnt odor, Lt atn, gLd fluor SLtst; m dk gry, sLt w/ ct Lams, v wL cat, fnt odor, it stn, srtk gLd fluor Sst; m dk gry, vfsdu/c[ Lams, v aL cmt, pyr, fnt odor, [t stn, strk gld fluor Sst; m dk gry, vfsd ~/cL Lams, v ~L cmt, pyr, n odor, n stn, n fluor SLtst; ct-att, carb Lam, wL cat, n odor, n stn, n fluor SLtst; c[-sLt, carb, pyr, ~L cat, fnt odor, strk Lt stn, strk gLd fluor Sst; ct-lsd, carb Lam, uL cat, fnt odor, strk Lt stn, strk gLd fluor Sttst; cL-sLt, carb, uL cat, fnt odor, Lt stn, gtd fluor Sst; ct-lsd, carb, uL cat, fnt odor, [t stn, g[d fluor Sst; cL-vfsd, carb, fnt odor, Lt stn, gLd fluor SLtst; cL-vfsd, carb, wL cmt, fnt odor, Lt stn, strk gLd fluor SLtst; ct-sit, carb, uL cat, fnt odor~ Lt stn~ sptd g[d fluor SLtst; c[-sLt, carb, uL cmt~ fnt odor~ [t stn~ strk gLd fluor Sst; vfsd, carb, uL cat, fnt odor, Lt stn, gLd fluor * FRACTURED PETROLEUM TESTING SERVICE, INC. Page No. Fire No. Date 3 ?0075 Hatch 27, 1990 COHPANY CORE TYPE HUD TYPE BRITISH PETROLEUM EXPLORATION ALASKA 4 INCH FIBERGLASS SLEEVE CORE ANALYSIS AIR HELIUH PERHEABILITY OIL WATER TOTAL DEPTH POROS I TY md. O/W SATN SATN SATN ft. PERCENT HORZ. VERT. RAT lO 7731 .? 16.1 <0.1 0.07 6.3 86.1 92.4 7752.3 16.9 0.2 0.02 1.2 75.1 76.3 7732.&5 16.5 0.1 0.72 31.8 44.4 76.2 7733.7 15.0 0.1 0.15 10.9 74.4 85.3 7733.8 <0.1 7734.4 13.0 0.4 0.26 17.8 69.6 7734.9 13.2 5.0 0.02 1.1 65.8 APPARENT SAND GRAIN DENSITY gm/cc 2.7'4 2.7'1 2.63 2.65 87.4 2.82 66.9 2.63 WELL FAk~I LAKE #1 FIELD WILDCAT COUNTY STATE ALASKA LITHOLOGY Sttst; ct-sit, carb, pyr, wt cmt, fnt odor, tt sin, sptd gtd fluor Sst; Yf-fsd, carb, pyr, wL cmt, fnt odor, tt sin, gLd fluor Sst; Yf-fsd, carb, pyr, NL cmt, fnt odor, Lt sin, gLd fluor Sst; Yf-fsd, carb, NL cmt, fnt odor, tt sin, gtd fluor Sst; vf-fsd, carb, ~t c~t, fnt odor, tt stn, gtd fluor SLtst; m dk gr¥, sit ,/ vfsd Lams, v wL cmt, fnt odor, Lt sin, strk gLd fluor TYPE OF EXTRACTION - DEAN STARK TOLUENE EXTRACTION CONFINING PRESSURE ON THE PERHEAMETER = 300 psi OIL GRAVITY ESTIHATED BY VISUAL FLUORESCENCE = 24 A.P.I. PETROLEUM TESTING SERVICE, INC. Client: ARCO Alaska, Inc. File: 70075 Date: March 1990 Well: Fawn Lake #1 Field: Wildcat State: Alaska SIDEWALL CORE ANALYSIS 1. Trim sidewall sample to right cylinder and maximum length. 2. Extract water and hydrocarbons from sample using Dean-Stark toluene method. Record produced water volume. 3. Vacuum dry at 150°F until weight is stable. Allow sample to cool and weigh to the nearest 0.01 gram. 4. Measure bulk volume using mercury immersion method. 5. Measure sand grain volume using a Boyle's Law helium porosimeter. Calculate porosity, saturations, and grain density. 6. Mount sample in a hydrostatic Hassler-type sleeve using a confining stress of 300 psi. 7. Measure permeability with nitrogen gas using a calibrated flow tube-type permeameter. PETROLEUM TESTING SERVICE, INC. 'Page No. FiLe No. Date 1 7OO75 Hatch 27, 1990 COMPANY CORE TYPE HUD TYPE BRITISH PETROLEUM EXPLORATION ALASKA 4 INCH FIBERGLASS SLEEVE HELIUM AIR OIL UATER TOTAL DEPTH POROSITY PERHEABILITY O/U SATN SATN SATN ft. PERCENT md. RATIO XPV XPV XPV i..o.l. .o.~..i. lO0.lOl.l... .e..! ...e e...e 7055.0 23.5 10. 0.00 0.0 100.0 100.0 7450.0 23.5 7.3 0.07 6.2 90.5 96.7 7473.0 22.4 35. 0.14 11.7 83.2 94.9 7485.0 19.7 . 0.18 10.4 59.1 69.5 7517.0 25.7 333. 0.00 0.0 100.0 100.0 7530.0 26.4 441. 0.00 0.0 100.0 100.0 7548.0 26.9 772. 0.01 1.1 96.4 97.5 7563.0 23.6 20. 0.1)4 2.7 75.1 77.8 7567.0 25.0 54. 0.00 0.0 100.0 100.0 7577.0 22.4 10. 0.00 0.0 100.0 100.0 7586.0 22.5 8.4 0.00 0.0 100.0 100.0 7624.0 19.5 4.2 0.17 12.8 75.9 88.7 # 7634.0 20.0 14. 0.21 13.2 62.2 75.4 # 7635.0(A) 22.6 33. 0.78 27.2 34.8 62.0 # 7635.0(8)? 21.2 12. 0.15 9.6 65.9 75.5 # 7636.0 21.1 6.8 0.14 8.9 65.5 7&.& # 7637.0 21.6 17. 0.26 16.9 6~.5 81.4 # 7638.0 21.7 21. 0.29 17.0 58.1 75.1 T/ELL FIELD COUNTY STATE FAgN LAKE #1 MILDCAT ALASKA SIDEgALL CORE ANALYSIS APPARENT SAND GRAIN DENSITY gm/cc 2.63 2.67 2.65 3.15 2.67 RECOVERED INCHES LITHOLOGY ......e.. I.u..o.o. CLst; ct, alt, mod cmt, n odor, n stn, n fluor Sttst; ct, alt, mod cmt, fr odor, ttatn, atrk gtd fluor CLot; ct, alt w/aLt Lams, wt cmt, fr odor, Lt stn, atrk gLd fluor Sat; cL-vfod, pyr, mod cmt, fr odor, Lt atn, dL gLd fluor CLot; ct-aLt w/ott Lam, mod cat, n odor, n otn, n fluor 2.73 2.74 2.71 2.69 CLot; ct-aLt, pyr, mod Gm, n odor, n stn, n fluor CLot; ct-aLt w/aLt Lams, pyr, mod cmt, n odor, natn, n fluor CLot; ct-vfsd w/sd Lams, pyr, wt cmL, fnt odor, tt otn, dL gtd fluor Gist; GL-sit w/stt Lams, mod cmL, n odor, n stn, n fluor Gist; ct-sit w/att tams, pyr, wi cmt, n odor, n stn, n fluor 2.72 2.73 2.~ 2.65 2.6~ Gist; ct-stt w/aLt Lams, pyr, wL cmt, n odor, n stn, n fluor Sst; vf-fad, pyr, ut cmt, fnt odor, Lt atn, gLd fluor Sst; cl-fsd, pyr, ut cmt, gd odor, it stn, gld fluor Sst; vf-fsd, ut cmL, gcl odor, Lt stn, gLd fluor Sst; vf-fsd, ut cmt, gd odor, it stn, gLd fluor 2.63 2.65 2.65 Sst; cL*fsd, Garb Lams, wt cmt, gd odor, it stn, gid fluor Sst; vf-fsd, Garb, pyr, ut cmt, gd odor, Lt atn, gtd fluor Sat; vf-fsd, car;o, pyr, ut cmt, gd odor, it stn, gtd fluor # - ROTARY SIDEgALL SAMPLES * - SAMPLE FAILED DURING Ka TEST. PETROLEUH TESTING SERVICE, IgC. Page No. FiLe No. Date 2 7OO75 Hal'ch 27, 1990 COHPANY CORE TYPE IaJO TYPE BRITISH PETROLEIJH EXPLORATION ALASKA 4 INCH FIBERGLASS SLEEVE HELlUH AIR OIL UATER TOTAL DEPTH POROSITY PERNEABILITY O/U SATN SATN $ATN ft. PERCENT md. RATIO ~PV XPV XPV l~lltll llllilll llllllllilll lliil !I!! Iii!1 Iilii # 7639.5 14.0 0.4 0.16 13.5 83.6 9Z.1 # ?654.0 13.2 40.1 0.0~ 4.1 96.3 100.4 7670.0 29.9 12. 0.02 2.2 96.2 98.4 7125.0 22.6 19. 0.04 4.2 94.5 98.7 7770.0 20.4 15. 0.00 0.0 98.7 98.7 7792.0 21.0 33. 0.00 0.0 100.0 100.0 7822.0 19.8 26. 0.00 0.0 100.0 100.0 7830.0 27.3 315. * 0.00 0.0 100.0 100.0 7865.0 21.6 24. 0.00 0.0 83.1 83.1 7880.0 24.1 648. * 0.00 0.0 100.0 100.0 7893.0 21.3 41. 0.00 0.0 100.0 100.0 7925.0 21.9 62. 0.00 0.0 100.0 100.0 7960.0 28.5 3.0 0.00 0.0 71.4 71.4 8116.0 30.5 115. 0.00 0.0 72.0 72.0 8212.0 19.3 19. 0.00 0.0 100.0 100.0 8235.0 20.6 48. 0.00 0.0 100.0 100.0 8260.0 21.9 87. 0.00 0.0 100.0 100.0 UELL FIELD COUNTY STATE FAW LAKE #1 I~l LDCAT ALASKA SIDE~ALL CORE ANALYSIS APPARENT SAND GRAIN DENSITY gm/cc 2.61 2.65 RECOVERED INCHES LITHOLOGY ..~...... .0..0..0. Sst; ct-,sd, ci Lams, carb, ut cmL, fr odor, tt sin, gLd fluor CLot; ct-sit, u[ cmt, fnt odor, 8ptd tt atn, optd old fluor 2.60 2.62 2.67 2.64 2.66 Sttat; c[-vfsd, carb, ut cat, fnt odor, it atn, aptd gid fluor CLot; ct-vfod, carb, uL cat, fnt odor, Lt lin, aptd gtd fluor Sitar; ct-sit, pyr, ut cat, n odor, natn, gtd fluor Sttat; ct-aLt u/cty Lmm, ut cat, n odor, n stn, n fluor Ctet; ct-att u/aLt tams, ut cat, n odor, n sin, n fluor 2.65 2.46 2.66 2.64 2.59 CLot; ~L-att, mod cat, nod. r, n sin, n fluor CLot; cL-att u/sit Lmm, carb, mod cat, nod. r, natn, n fluor CLot; ct-att, mod cat, n odor, natn, n fluor CLot; ct-alt, carb, mod cat, n odor, n sin, n fluor CLot; ct-sit, carb, mod cat, n odor, n lin, n fluor 2.62 2.63 2.62 2.65 2.60 CLot; cL-oLt, carb, mod cat, n odor, natn, n fluor CLot; ct-att, carb, mod cat, n odor, notn, n fluor CLst; ct-sit, carb, mod cat, n odor, n sin, n fluor CLot; ct-aLt, mod cat, n odor, natn, n fluor CLot; ct-sit, mod cat, n odor, natn, n fluor FRACTURED ROTARY SlDEI4ALL SAHPLES PETROLEUM TESTING SERVICE, INC. Page No. 3 Fits No. 70075 Date March 27, 1~90 COMPANY CORE TYPE MUO TYPE BRITISH PETROLEUM EXPLORATION ALASKA & INCH FIBERGLASS SLEEVE HELIUM AIR OIL UATER TOTAL DEPTH POROSITY PERMEABILITY O/U SATN SATN GATN ft. PERCENT Ind. RATIO ~V XPV XPV ~---... -.-..... e.e......... ...0. --.. ....e 8265.0 22.6 61. 0.00 0.0 100.0 100.0 8270.0 22.9 18~. 0.00 0.0 100.0 100.0 8275.0 22.8 123. 0.00 0.0 100.0 100.0 8280.0 21.0 59. 0.00 0.0 100.0 100.0 UELL FIELD COUNTY STATE FAI~4 LAKE #I WILDCAT ALASKA SIDEWALL CORE ANALYSIS APPARENT SAND GRA! N DENSITY gm/cc 2.62 2.63 2.62 2.53 RECOVERED INCHES LITHOLOGY Ctst; cLesLt, carb, mod cmt, n odor, n stn, n ftuor Ctst; ct-sit, cerb, mod (:mt, n odor, n stn, n fluor Ctst; ct-stt, csrb, mod cmL, n odor, n stn, n fluor Ctst; ct-stt, cerb, mod ct,t, n odor, n stn, n fluor TYPE OF EXTRACTION - DEAN STARK TOLUENE EXTRACTION CONFINING PRESSURE ON THE PER#EAHETER · 300 psi OIL GRAVITY ESTIMATED BY VISUAL FLUORESCENCE · 2& A.P.I. These results must be used with caution. Sjcle~sLL samples are obtained by impact coring. This method can fracture hard formations, thereby possibly increasing the porosity and permeability, in soft formations, impact coring can compact the sampLes, resulting in cie creased porosity and permeability. DrilLing mud may penetrate fractures end soft formations, thereby affecting the porosity, pemeabitit¥, fluid saturation, grain density end cation exchange capacity results. PETROLEUM TESTING SERVICE, INC. PERMEABILITY AND POROSITY HISTOGRAM CUENT: B.P. EXPLORATION ALASKA INC. STATE: ALASKA FIELD: WILDCAT WELL: FAWN LAKE ~1 FILE No.: 70075 DATE: MAR. 27, 1990 DEPTH INTERVAL, fi: 7686.5- 7734.9 100 90 ~ 80 ~o 70 >~ 50 (7 30 ~ 20 10 :! :! :! . Cumulative Frequency ........ Arithmetic Mean 14.4 ..... Median Value 14.9 0 2 & 6 8 10 12 14 10 18 ~ ~2 24 28 ~8 ~ ~2 ~ .~ 38 40 42 44 4~ POROSITY, percenf lOO ~- 70 ~ z 60 w 5O 0 30 ~, 10 '~ 0 100 90 · .~ 8O ~ 7o ~- 6O ~ 50 z Cy 50 ~.- 20 lO . Cumulative Frequency ........ Geometric Mean .3 ..... Median Value .2 ................ 100 -,- SO ~ 70 ~ z 60 L,.I 50 (7 50 ~. 2o_ ::3 10:2 ::3 0 (~ .02 .04 .08 ,16 .32 .84 1.2~ 2J O. 10 20 40 00 leo 320 840 1280 25e0 8120 10240 PERMEABILITY, mlllldarcle= PETROLEUM TESTING SERVICE, INC. POROSITY - PERMEABILITY CROSSPLOT CLIENT: B.P. EXPLORATION ALASKA INC. STATE: ALASKA FIELD: WILDCAT WELL: FAWN LAKE ~1 FILE No.: 70075 DATE: MAR. 27, 1990 DEPTH INTERVAL, ft :7686.5- 7734.9 lO0 10 .1 .01 0 10 20 30 40 50 POROSITY, percenf PETROLEUM TESTING SERVICE, INC. GRAIN DENSITY- POROSITY CROSSPLOT CUENT: B.P. EXPLORATION ALASKA INC. STATE: ALASKA FIELD: WILDCAT WELL: FAWN LAKE ~1 FILE No.: 70075 DATE: MAR. 27, 1990 DEPTH INTERVAL, ft : 7686.5- 7754.9 Z I. tJ 1:3 Z 3.50 3.00 2.50 2.00 1.50 0 10 20 30 40 50 POROSITY, percenf Gamma Log 2.O 9m/et 3.0 7800. 7900, CLIENT: B.P. EXPLORATION ALASKA INC. DATE: Mar. 27, 1990 WELL: FAWN LAKE t~l PTS J.O. t~70075 FIELD: WILDCAT 4,5 ~ 15 I I I ~ I I I __~ ~___~_~ .... ---I -- I I I II II , II II I! II II II DIRECTIONAL SURVEYS .,, COMPFtNY .... BP EXPLORRT'I' ON · , NELL ....... FRNN LRKE ~1 ,, FIELD ...... ~ PRIJF1HOE ;BRY COUNTY ..... O~,, T. 6 I'~} A ~. NORTH SLOPE STRTE ...... FtLFISKFt 'COUNTRY .... USR ,, HELL LOCRTZON : LI-qTZTU~E LONGTTUDE 2258" SNL, 3180' kIEL, SEc 25 , T 12_ N, Rt3 F IJM I]RILLTNG 'COMPRNY ' NRBORS RIG : NRBORS 18E PERMRNENT DEPTH DRTUM : MERN SER LEVEL ELEV. : 21.~' SURVEYS MERS. FROM : KELLY BUSHING, LOCRTED 5~.9' RBOVE PERM. DRTUM. SPUD DRTE ..... ~/4/90 PROP. RZIMUTH ..... N.R. MND STRRTED .. 2/10/80 TO.TRt_ DEPTH ...... 836D,' MND ENDED .... 2/16/90 TELECO JOB lB .. 744-TRK COORD. GRID SYSTEM - GRII] ORIGIN ; , GRID CORR. : O0 MRGNETIC DECL. CORR. : 30.O .GRID OECL. CORR. : OO RED!US OF CURVBTURE METHOD USED FOR SURVEY CBLCULRTION5. YERTICRL HELL : CLOSURE CBLCULBTED BT ERCH SURVEY STRTION. INITIRL TIE-IN TO RSSUMEO VERTICBL T0,2700'. COMPRNY PERSONNEL ...... MRX FERNRNDEZ EVERETT POTTER DIRECTIONRL COMPRNY ... NR DIRECTIONRL DRILLER ... NB TELECO PERSONNEL ...... JOHN BURTON MIKE MCQUEEN ,.' ..... ,~ ,,. -- REMRRKS : ~" ~ ~ '""' ..... APR - 5 :. ,,, - , . ~ Iii ~ I'I~ ~I[ I I , ~ '"~ ',,,.',~ ' ~z 'z ~ ........ , . , , "' .. ........ TELE~ DIRECTIOnaL SURVEY LISIlN6 Company ................... ... BP EXPLOR~IIDN · Nell ......................... FP~4N LF~,E #1 ' .Su~ve~ Calc. Heth~d .......... Radius oF Ctkrvatuce Vert. Sect. Calc. Hethod ..... Vertical uell: Closure calculated at each survey station. Proposed Rzimu~ ............. N'.R. Page 2 of 3 Teleco Job ID.: 7qq-lP, K Grid Correction: O0 Hag. Decl. Corr.: 30.0 Grid Dec1. Corr.: O0 ~.D~TH CRS LE~ I~CLI~TIO~ Feet Feet de,q~ees RZIHUIH T.V.D, CLOSURE NORTH/SOUTH d~rees Feet Feet Feet INIII~L TIE-TN COOY3I~qlES 2700 0.000 0.000 2700.00 0.00 0.00 2795 95 0.200 2E59 64 0,300 2986 127 0.200 3081 95 0.000 3175 94 0.000 3270 95 O. 1 O0 3364 94 0.200 3458 94 0,200 3552 94 0,200 3647 95 0.300 3741 94 O,qO0 3837 96 0,200 3932 95 0,400 · 4027 95 O,qO0 4124 97 0,400 4282 158 O,qO0 4407 125 O,BO0 4500 93 0,300 ~--J95 95 O,4OO 4687 .92 O,qO0 4783 96 O,qO0 4878 95 0,400 4970 92 0,100 506q 94 0.200 5161 97 0.100 5255 94 0.100 5350 95 O.qO0 5445 95 0,500 5539 94 0,600 5635 96 0,700 5731 S6 0,700 5824 93 0.700 5921 97 0.500 6014 93 O.qO0 6108 94 0.400 6206 98 0.500 6301 95 O,qO0 294.300 2795.00 0.17 0.07 272,000 2859.00 0.44 0.13 198.200 2986.00 0.86 -0.16 105.400 3081;00 0.83 -0,30 78.300 3175.00 0.83 -0.30 23.400 3270.00 0.77 -0.22 86.700. 3354.00 0.56 -0.09 248.400 3458.00 0.59 -0.31 234.700 3552,00 0.92 -0.47 239.800 3647.00 1.33 -0.69 255.500 3740.99 1.90 -0.91 226.100 3836.99 2.q0 -1,15 308.900 3931.99 2.81 ~1.17 313.100 4025.59 3,14 -0.74 318.q00 4123.5'9 3,54 -0.25 287,800 4281,98 q,46 0,34 257,900 4406,98 5,53 260.q00 4499.97 6.24 0.26 338.700 4594.97 6.72 0.53 ~7.100 4686.97 7.27 0.80 236.500 4782.97 7.86 0.54 12,200 4077.97 B.31 0.83 252.200 4969.98 B.5B 1.05 300.000 5063.96 B.22 1.08 284,400 5160,96 9,06' 1,18 .244,200 5254,96 9,22 1,16 2~.I00 5349.96 9.54 0.94 193,200 5444,96 9,88 0,31 217,900 5538,96 10,27 -0,50 186.400 5634.95 10.77 -1.49 205,100 5730.94 11.29 -2,62 182.200 5823.94 11.85 -3.71 151,000 5920.93 11.97 -4.69 179.800 5013.93 12.10 -5.39 185.400 ~107.92 12.q3 ---5.04 183.300 5?_05.92 12.87 -6.81 194.900 ~300.92 13.37 -7.55 ERST/1,ESTDOCLEG SEY; Feet de~/lOOFt -0.15 .0.211 -0,42 0.215 -0.85 0.245' -0.78 0.211 -0.78 0.000 ~0.74 0.105 -0.55 O. 190 -0.50 O,,k'~ -0.79 0,051 -1.14 0,108 -1.67 0.146 -2,10 0.256 -2,56 0.447 -3.06 0.031 -3.53 0.038 -4.44 0.134 -5.52 .~ 0.258 -6.24 0.323 -6,70 0.422 -7.22 0.568 -7.84 0.149 -8.27 0.78O -8.51 0.498 -8,75 0.162 -8.98 0.110 -9.14 0,073 -9.49 0.320 -9.88 0.315 -10.~ 0.271 -'10,67 0.381 -10.98 0.237 -I1.25 0.299 -'I1.02 0.387 -10.84 0,262 -10.87' 0.042 -10.92 0.103 -11.04 0.1~ " TELE~ DIRECTIONAL SURUEY LISTI~ ii i ii , i _ ~ ' iii # Company ...................... I~ EXPLORATION ~ell; ........................ SurvW Calc. ~tJqod .......... Radius of Curvature VerL Sect. Calc. Hethod ..... Uertical ~ell: Closure calculated at aach sarve~ station. Proposed Azimuth ............. Page 3 of 3 leleco Job ID.: 74~-IAK Grid Correction: O0 Peg. Decl. Corr.: 30.0 Grid Decl. Corr.: O0 M.DPIH Feet 6426 6521 6707 68O5 6898 CRS LB II~l~llSN AZI~IUTH T.Y.D. CLOSURE NORIHtcj3UIHERST/I~ESTDOGLEGS. Feet de~mes d~mes Feet Feet Feet Feet deq/lOOft 125 0.800 185.000 6~5.91 14.32 -8.83 -11.27 0.329 · 95 O.GO0 I92.400 6520.90 15.18 -9.98 -11.q4 0.231 93 0.600 162.200 5513.90 15.80 -10.94 -11.~0 0.3,36 93 0.800 167.100 6706.89 15.37 -12.04 -11.10 0.224 98 0.800 150.600 6804.88 17.02 -'13.31 -10.60 0.2'31 93 0.600 1~5.700 6897.88 17.~3 -14.27 -10.01 0.224 25a 0.300 157.300 7151.87 18.al -16.02 -9.05 0.123 9~ '0.300 153.000 72~5.87 18.70 ,-16.a7 -8.~ 0.024 95 0.~00 lq9.200 73~0.85 19.02 -16.98 -8.57, 0,108 106 O.g)O 159.~00 7a~6.85 19.a8 -17.65 -8.25 0.067 '7152 72~6 73~11 7~1~7 753~ 87 7628 94 7786 158 7917 131 8015 99 8102 86 8259 157 lk,q2G 67 0.300 188.600 7533.86 19.93 -18.17 -8.19 0.231 0.500 150.200 7627.86 20.q6 -18.B0 -8.07 0.3z6 0.800 129.800 7785.85 21.32 -20.17 -6.93 0.237 1.100 lq3.900 7916.83 22.a2 -21.75 -5.q5 0.289 0.800 137.900 . 80'15.82 23.q~ -23.02 -~.~1 0.319 0.700 139.700 8101.81 2~.15 -~.87~ -3,57 0.119 0200 120.000 8258.~0 25.'19 -~.09 -2.20 0.153 0.800 117.000 8325.79 25.55 -25.51 -1.~3 0.150 AOGCC GEOLOGICAL MATERIALS INVENTORY LIST COMPLETION DATE ~ I 2.- ? I ~.-~ CO. C'ONTACT & NO.,/~,~, ... ' ~s,~'~' ,;o ........... .:,,;~'.'~,..'.-., p 0 ri .... 403 yes no sundry application 404 yes no report'of sund~/application ' Open required received Cased req-u-i~d--'~ reC-e'i~,e~i"':~'~i~-C~ior ~equiYed 'received hole log hole, log,,, log MUD _.._..~~./. GCT TEMP DI~SFL ~ ~ cNL PROo oLL ..........C~t P~e~s ..... BHCISL ~~' CET SPINNER BH~/a~ ..... '~'~ " oilier Data . ,, ,, ,I , .......... SSS PACKER Digital FDC- ~5 ~ ~ d CNI_ ~ Te~'i~ FDc RWD' required' ~cccivcd S~UPLES required received MWD LDTICNL ~ '" ~ ........... d~ditch' ~' "~ ........ , cYBER cot= LOOK ~ ~ , ~!lal~si~ , n~t ~ ~ .......... ....... , .... AOGCC DETAILED WELL LOG INVENTORY PERMIT NO. ,~ o - /~ LOG TYPE RUN # INTERVAL SCALE 02) 07) O9) ~0) ~) ~2) ~3) , , ~) ~5) ~6) ~?) ,,, ~8) s' MEMORANDUM [ate 5f ka ALASKA OIL AND GAS CONS..RVATION CO~MI " /? ........- - · /~¢7~ ~' February 14, 1990 TO: ~onnze C. Smith ~ATE: Co,is sioner F~LE NO: JT. BDF. 24 TELEPHONE NO: THRU: SUBJECT,' FROM: Bobby D. Foster . Petroleum Inspector BOP Test BPX Fawn Lake .#1 Permit #90-13 Exploratory Sec. 25, TllN R14E Thursday, February 8, 1990: The test began at 2:00 a.m. and was ~~--A-~~~ the attached BOPE test report shows, there were no failures. An ice plug was found in the choke manifold. After all the valves and lines were steamed, the manifold then tested po s itive. In summary, I witnessed the BOPE Test on Nabors Rig 18E upon BPX's Fawn Lake #1. Attachment 02-001A (Rev. 8/85) STATE OF ALASKA ALASKA 01L AND GAS CONSERVAT i ON COMM I SS I ON BOPE Inspection Report Location (general) ,,/" Well sign housekeeping ti' Rig ~.~ General Reserve pit Audio MUD SYSTEMS: Visual Trip tank Pit gauge Flow monitor Gas detectors BOPE STACK: Test Pressure Annul ar preventer Pipe rams Blind rams , Choke line val yes ~,/.~'~ ~ . Kill line valves Check valve ft ACCUMULATOR SYSTEM: Full charge pressure Press after closure Pump incr clos press 200 psig Full charge press attained Controls: Master ~/~ ~] / Remote~lZ~,~ Blind switch coverC~, ~/ KELLY AND FLOOR SAF~Y VALVES: psig psig sec Upper Kal Lower Kal Ball type ! nsi de BOP Choke manifold Number valves . 'NUmber fl anges Adjustable chokes Hydraulically operated choke Test pressure Test pressure Test pressure Test pressure ,/ TEST RESULTS: Failures (~]) Test time ,, 4 hfs Repair or replacement of failed equipment to be made within and Inspector/Commission office notified. days Distribution: orig - AOGCC c - Operator c - Supervisor C.004 (rev 03/17/89) January 19, 1990 Telecopy No. (907) 276-7542 M E Miller Exploration Lead Engineer BP Exploration (Alaska) Inc P 0 Box 196612 Anchorage, A_K 99519-6612 Re ~ Fawn Lake #1 BP Exploration (Alaska) Inc Permit # 90-13 Surf Loc 2250'FNL, 2i00'FWL, Sec 25, T12N, R13E, UM Btmhole Loc 2250'FNL, 2100'FWL, Sec 25, T12N, R13E, UM Dear Mr Miller: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. Very t~ul~ours, C V Chatterto~ Chairman Alaska Oil and Gas Conservation Commission BY ORDER OF THE COb~MISSION jo Enclosure ~ Department of Fish & Game, Habitat Section - w/o encl Department of Environmental Conservation - w/o encl BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 11, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton Fawn Lake #!, Enclosed, in triplicate, is form 10-401, our Application for Permit to Drill the above-named well. Also included are the attachments listed on the application form, and a check in the amount of $100 to cover the permit filing fee. Please treat the well information as "Confidential". Yours very truly, M. E. Miller Exploration Lead Engineer MEM/KTH ~~ cc Richard Loveland Well File RECEIVED STATE OF ALASKA ALASKA OiL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 Re-Entry [] Deepen~1 Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exoloration KBE -- 66 feet Wildcat 3. Address 6. Property Designation P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 2~277 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 2250' FNL, 2100' FWL Sec. 25, T12N, R13E I~lV, t Fawn Lake At top of productive interval 8. Well number Number Same Fawn Lake ttl 2S 100302630-277 At total depth 9. Approximate spud date Amount Same February 1, 1990 $200,000. O0 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(UDandTVD) property line ADL 28299 @ 2100 feet F-19/4173'@ 9444 feet 2560 8566' MD/TVD (BKB)feet 16. To be completed for deviated wells VERTICAL 17. Anticipated pressure (see 20 ^^c 25.035 (e)(2)) Kickoff depth feet Maximum hole angle o Maximum surface 3100 psig At total depth (TVD) 7920'/4100 pslg 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 26" 20" 13311 K-55 BTC 80' Surface 115' 115' 250 cu 17-1/2" 13-3/8" 7211 L-80 BTC 2645' Surface 2680' 2680' 4200 cu fl Arcticset 8-1/2" 7" 29&3211 L-80 BTC 8531' Surface 8566' 8566' 500 cu fl Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECE'IVEP Intermediate Production Liner Perforation depth: measured true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby .certify that the foregoing is true and correct to the best of my knowledge Signed~. 2..~ Title Exploration Lead Engineer Date Commission Use Only Permit Number IAPI number IApproval date ISee cover letter ,~"'~ ]5 o- ~?- ~ z ~o,,~ [ 01 / 1 9/, 9 ~). [for other requirements Conditions of approval Samples required /,~Yes [] No Mud log required .,l~rYes [] No Hydrogen sulfide measures i-'l Y~,~,~' No Directional. survey requ~rea [] Yes ,,~ No Required working~sure/for~OPl~/i~2M;/ ID~3M; ~5M; I-I10M; I-I15M; Other' /~ ' //"1'/ / //// ;./ ./_ / , / -- · ' ~ - - '- . . by order of Approved by/ ~//-Z ~. ~~~ Comm,ss,oner tne comm,ssion Date~/////~,,~~' Form 10-401 I~{'e~7. 12-1-85 ! / Submit/ dicate CONFIDENTIAL PROPOSED DRILLING AND COMPLETION PROGRAM FAWN LAKE #1 Obiective: It is proposed to drill Fawn Lake #1 as an Exploration well during the early winter months of 1990. The well is to be drilled from an ice pad to be built approximately 2 miles northeast of the BP X Prudhoe Bay Unit T-pad. An ice road from T-pad will provide access. The well will be a vertical hole to approximately 8566' tvd bkb. No overpressured zones are expected and seismic data indicates no shallow gas pockets. O~)eration: Install and cement 80' of 20" conductor to surface. Diverter. Install 20" Drill 17-1/2" hole vertically to 2700' and cement 13-3/8", 72#/ft, L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum expected bottom-hole pressure is 4100 psi at 7920' TVDss. Maximum possible surface pressure is 3100 psi based on a gas column to surface. Drill a maximum of 10' of new hole and perform a formation leak-off test. Drill, and core an 8-1/2" hole vertically to TD at approximately 8566'. Run open hole logs and seismic. If testing is required, run 7", 29#/ft and 32#/ft, L-80 BTC casing from TD to surface and cement using Class G cement. Any testing will be done with the rig on location. Clean out to 7" float equipment. Change over to 10.0 ppg NaCI completion fluid. Test casing to 3000 psi. Rig up test facilities and flow test the well through drill pipe or tubing. Suspend or abandon the well with the appropriate plugs and markers according to AOGCC regulations. Move the rig and equipment from location and clean the pad and the ice road access area. /~4Z~a~W~aste fluids incidental to the well will be trucked from the location to an approved disposal site or pumped down the 7" x 13-3/8" annulus. If the well is suspended, the 7"x 13-3/8" annulus and the inside of the 7" casing will be adequately freeze protected. MEM 1/4/90 I~CEMENT FAWN LAKE ~ 1 PROPOSED WELL DIAGRAM NON-FREEZING FLUID vertical well TVD (BKB) MD (BKB) 20"CONDUCTOR BASE PERMAFROST 13-3/8" 72~/FT L-80 BTC .... BOTTOM OF FREEZE PROTECTION TOP OF 7"CEMENT 7" 29'~ & 32'=, L-80, BTC 80 FT BGL 2680 FT (ESTIMATED) 3000 FT (ESTIMATED) 6000 FT 8566 FT MEM 1/4/90 BOP STACK CONFIGURATION 13 5/8", .5000 PSI WP TRIPLE RAM STACK DRILLING RISER I I ANNULAR PREVENTER I PI PE RAMS I I I I BLIND RAMS I 2" KILL LINE MANUAL HYDRAULIC GATE GATE DRILLING SPOOL I PI PE RAMS I 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE SURFACE HOLE DIVERTER SYSTEM BP AMERr, A Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. ,, F~II ~p=~/i~,.~ 10 ~Valvd{ 35' or as required 3' Dresser Sleeve 10" Diverter Line 1. All pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. ,~// 2. Manual 10" b~ valves" mechanically connected to ensure that one valve is fail-safe open at all times. 3. All turns are 90 deg. and targeted. 10" Full opening ball valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet , M EM 1/3/90 /v /"1 r- l ,, ? J ~. ~ '"'v' ! I 4 " /-- -- -~ -- -- FAWN LAKE NO. , ~---- I ~ ~,o Ti: Lot. 70°21'sa.a~" - '_ ~ ) ~, Long. 148°43'56.!I" ' '" i i Y=5,985,209 ~ j~1 \;¢_ i 1\ '~ '~, ASP zoo~ ~ ,, !\ -- u~ ~. . .~,,.,, i.5 SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA, THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPERVISION, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. / [)ATE t/l/<~O REGISTRATION NO FAWN LAKE NO. 1 Located in NW 1/4 S~c. 25, T. 12N., R.15 E., U.M., Ak. Surveyed For B.P. EXPLORATION, INC. Surveyed by OCEAN TECHNOLOGY, LTD. ENGINEERS, SCIENTISTS., SURVEYORS 8700 ARCTIC SPt JR RD. ANCHORAGE, AK. _$45DUA124:[DRANO~I]FLi_C. LOSAP~SHORT. LIS~I 8-dAN-1990 13:19 --- C!osest Ap~'roach--A-nalgsis --- Date' 8-jAN-90 Time: 13'19:54 Pm~e ! Search Radius= 5000 COURSE LINE For proposed well' FL1 [ 0-25-12-13] Location = W-E S-N TVD(SBS) Top 656703.00 5985210.00 -66.00 Note: All depths in ~eet Below ½etlg Bushing (BKB) Closest Approach TVD DEPART TVD DEPART DISTANCE , ,A0~9:~06~900 Vertical intersection /PRO~O~p\ /NEA~Y\ TVD DEPART TVD DEPART DISTANCE F-19 A0~9-~103000 F-24 9062.4 261.1 9444.6 7858.9 417~.9 906~.4 ~61. i 9400.4 7460.~ NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW SUMMARY The well ~hich comes closest to the proposed well is: AO~9-~O~=.O0 F-19 Glosest approach distance = AiCK OFF ~or this run = 4172.9 ~eet 8000.0 ~eet - Choke Manifold - Poor Boy Degasser TANg. - Brand t Vacuum.-Type Degasser - Brand t Dual Tandem Shale Shaker - Pioneer Mud Cleaners - Pioneer HKI Centrifuge · TRIP TANK IILJD 5Y~T'£H ~ff~ FAC/I./r/ES / jro DU~L TA~D~H 5~LE FLOW~ V~LI,IHE TAMK p,~,~ 55ER '7'AIq K I'~O 88L- V'AC u u ~ I TYf~ IOO ~ MUD DISTRIEUTION D/TC' / / / A,UO KI;L CONE Uw~PG'RFZOW' . ' )IT 1 - RecOrding drilling fluid, pit *level indicator with both visual and audio devices at driller's console 1 - Trip Tank (75 BBL.) 1 - Drilling fluid flow sensor with readout at driller's console 11 - 5 Hp AgitatOrs warni~ BP EXPLORATION Memorandum To: Mike Miller January 12, 1990 From: Subject: Shallow Gas Seismic Reveiw I have reviewed the seismic data over the Fawn Lake prospect. My interpretation of the data shows no evidence for the presence of gas above 2000'. cc: Fawn Lake f'fie AK 3407-7 (1/89) CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE 1. (8) (3) mdmin,(~_~ /~j~/~ 9. 9 thru 1~) ' 10. (10 and 13) 12. 13. (4) .Cas g (14 thru 22) (23 thru 28) (6) OTHER f~9. ///Z-4z9 th~u '31) (6) Add: Geology: Engineering: D~LCS ~-';~'~BEW -er: 01/30/89 14. 15. Is the permit fee attached .......................................... ~ 2. Is well to be located in a defined pool ............................. 3. Is we~l located proper distance from property line .................. 4. Is weL~_located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ...................... 16. 17. 18. 19. 20. 21. 22. 23. 24. '25. _26. 27. 28. For 29. 30. 31. 32. Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number ......................... Lease&YES Well NO No. Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate//~ Are necessary diagrams and descriptions of diverter and BOPE attached. ~oes BOPE have sufficient pressure rating - Test to ~~ psig .. Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. exploratory and Stratigraphic wells: 0 Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of Seabed conditions presented~ Additional requirements ............................................. INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi No special 'effort has been made to chronologically organize this category of information. SCAN ONLY -- 99 FILES. DOIT -- · SCAN ONLY -- 99 FILES. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 29 30 31 ***** REEL HEADER 1 LISWRT 90/04/03 ***** TAPE HEADER ***** 2 LISWRT 90/04/03 McCORD-LEWIS ENERGY SERVICES - PETROS WELL LOG ANALYSIS SY McCORD-LEWIS ENERGY SERVICES - PETROS WELL LOG ANALYSIS SY ***** COSLM. ENTS ***** ***~**~***~**********~****************~******~***********~***** * * BP EXPLORATION (ALASKA) INC. * * THIS TAPE CONTAINS DATA WRITTEN IN LIS FORMAT 1600 BPI DENSITY * * * COMPANY: BP EXPLORATION (ALASKA) INC * WELL : FAWN LAKE NO.1 * FIELD : WILDCAT * COUNTY : NORTH SLOPE BOROUGH * STATE : ALASKA * COUNTRY: USA * SECTION: 25 * TOWNSHIP: 12N * RANGE : 13E * API NUMBER: 500292200700 * * DENSITY -- NEUTRON - 2519.5 - 8358.0 * * NEUTRO~ CURVES RECORDED ON SANDSTONE MATRIX * ***** FILE HEADER ***** 32) LISWRT.00~ 90/04/03 1024 LO ***** CO~ENTS **~** 33) FIELD 292 WELL 2007 ( ENTRY BLOCKS UP/DOWN FLAG FRAME SPACING FRAME SPACING UNITS ABSENT VALUE 34) ~**** DATA FORMAT SPECIFICATION ? o -/3 255.000 60.0000 .lin -9999.00 ORI§INAL RECEIVED APR - 5 1990 Alaska Oil & Gas.Cons. G~mi~!~ /lnc~Orao~ DATUM BLOCKS MNEM SERVICE SERVICE UNIT API API API API FILE SIZE PROCESS SAMPLE REPR ID ORDER % LOG TYPE CLASS MOD NO. LEVEL CODE DEPT FT 0 0 0 0 i 4 0 1 68 CALI LDT I INCH 0 0 0 0 1 4 0 1 68 PEF LDT 3 B/E 0 0 0 0 i 4 0 1 68 DRHO LDT 5 G/CC 0 0 0 0 1 4 0 1 68 RHOB LDT 6 G/CC 0 0 0 0 i 4 0 1 68 NPHI SAND 15 PU 0 0 0 0 1 4 0 l 68 1C It0 F I LMED ENPH SAND 16 PU 0 0 0 0 1 4 0 1 68 SGR NGT 50 API 0 0 0 0 1 4 0 1 68 CGR NGT 51 API 0 0 0 0 1 4 0 1 68 POTA NGT ~2 PERC 0 0 0 0 1 4 0 1 68 URAN NGT 53 PPM 0 0 0 0 1 4 0 1 68 THOR NGT 54 PPM 0 0 0 0 1 4 0 1 68 *~*** FILE TRAILER ,4*** ( 592) LISWRT.001 ***** END LOGICAL FILE 90/04/03 1024 LO 592 LOGICAL RECORDS 4**** 11678 FRAMES READ FROM 557 RECORDS, COMPUTED FRAME SPACING= 0.5000 FT 11678 DATA FRAMES FROM 2519.50 THROUGH 8358.00 RECORDS STATISTICS FOR DEPTH 2519.5 TO CH MNEM SID CURVE MINIMUM MAXIMUM 1 CALI LDT 1 3.43750 22.3281 2 PEF LDT 2 0.833984 61.0313 3 DRHO LDT 3 -1.17290 0.201621 4 RHOB LDT 4 1.23473 2.73524 5 NPHI SAND 5 9.09582 80.7978 6 ENPH SAND 6 8.24236 87.5124 7 SGR NGT 7 0.000000E+00 311.365 8 CGR NGT 8 0.000000E+00 199.754 9 POTA NGT 9 0.000000E+00 0.450275E-01 10 URAN NGT 10 -0.217680 23.1889 11 THOR NGT 11 0.000000E+00 35.1805 END LOGICAL FILE - 1 35 THROUGH 591 8358.0 MEAN STD-DEV SAMPLES 9.88814 1.23255 11678 4.19060 4.15685 11678 -0.531121E-04 0.188175 11678 2.19609 0.164269 11678 39.3951 7.13434 11678 36.6135 8.00173 11678 77.7692 30.2483 11678 58.8988 20.6012 11678 0.182984E-01 0.694737E-02 11678 2.48650 1.65099 11678 7.48867 2.64074 11678 START LOGICAL FILE - 2 4**** COMMENTS ***** 1) * 3) * 4) 4 INDUCTION - SONIC - 2422.5 - 8405.0 ,4*** FILE HEADER ***** 7) LISWRT.002 90/04/03 1024 LO LISWRT.001 4**** COMMENTS **4** FIELD 292 WELL 2007 ( 9) ,44** DATA FORMAT SPECIFICATION *~** ENTRY BLOCKS UP/DOWN FLAG 255.000 FRAHE SPACING 60.0012 FRAME SPACING UNITS .liN ABSENT VALUE~ o -9999.00 DATUM BLOCKS HNEH SERVICE SERVICE UNIT API API API API FILE SIZE PROCESS SAMPLE REPR ID ORDER 9 LOG TYPE CLASS MOD NO. LEVEL CODE DEPT FT 0 0 0 0 2 4 0 1 68 SP DIL 21 MV 0 0 0 0 2 4 0 1 68 GR DIL 20 API 0 0 0 0 2 4 0 1 68 SFLU PDIL 11 OHMM 0 0 0 0 2 4 0 1 68 MSFL MSFL 31 OHMM 0 0 0 0 2 12 0 3 68 IMPH PDIL 32 OHMM 0 0 0 0 2 4 0 1 68 IDPH PDIL 33 OHMM 0 0 0 0 2 4 0 1 68 CALI MSFL 34 INCH 0 0 0 0 2 4 0 1 68 DT SDT 40 US/F 0 0 0 0 2 4 0 1 68 DTL SDT 41 US/F 0 0 0 0 2 4 0 1 68 DTLN SDT 42 US/F 0 0 0 0 2 4 0 1 68 DTLF SDT 43 US/F 0 0 0 0 2 4 0 1 68 DTCO SDT 44 US/F 0 0 0 0 2 4 0 1 68 DTSM SDT 45 US/F 0 0 0 0 2 4 0 1 68 ***** FILE TRAILER ***** ( 808) LISWRT.002 90/04/03 1024 LO END LOGICAL FILE 808 LOGICAL RECORDS ***** 11965 FRAMES READ FROM 798 RECORDS, COMPUTED FRAME SPACING= 0.5000 FT 11965 DATA FRAMES FROM 2422.55 THROUGH 8404.55 RECORDS 10 THROUGH 807 STATISTICS FOR DEPTH 2422.5 TO 8404.5 CH MNEH SID CURVE MINIMUM MAXIMUM MEAN STD-DEV SAMPLES 1 SP DIL 1 -112.125 -1.79590 -47.5879 27.2450 2 GR DIL 2 12.1719 262.250 69.5329 26.5933 3 SFLU PDIL 3 0.301758 144.250 3.50281 2.56569 4 HSFL MSFL 4 0.138184 362.250 6.26749 6.53436 5 IHPH PDIL 5 0.791016E-01 1950.00 3.12130 36.4507 6 IDPH PDIL 6 0.292969E-02 20.1563 2.32377 1.17470 7 CALI HSFL 7 1.69629 22.1094 9.57415 1.84892 8 DT SDT 8 55.2000 229.100 117.929 31.0638 9 DTL SDT 9 33.8000 159.200 108.472 17.5852 10 DTLN SDT 10 -76.3000 206.400 107.169 16.9893 11 DTLF SDT 11 26.4000 331.200 107.158 17.2343 12 DTCO SDT 12 0.000000E+00 140.000 91.8977 25.1455 13 DTSM SDT 13 0.000000E+00 186.000 140.520 34.1157 11965 11965 11427 35893 11427 11427 11965 11965 11965 11965 11965 11965 11965 END LOGICAL FILE - 2 START LOGICAL FILE ***** COMMENTS * CASED HOLE GAMMA RAY TO SURFACE 15.5 - 2879.5 ***** FILE HEADER ***5, 7 LISWRT.003 90/04/03 1024 LO LISWRT.002 ***** COFhW[ENTS ***** 8 FIELD 292 WELL 2007 9 ***** DATA FORMAT SPECIFICATION ***** ENTRY BLOCKS UP/DOWN FLAG 255.000 FRAME SPACING 60.0000 FRAME SPACING UNITS .lin ABSENT VALUE -9999.00 DATUM BLOCKS MNEM SERVICE SERVICE UNIT API API API API FILE SIZE PROCESS SAMPLE REPR ID ORDER % LOG TYPE CLASS MOD NO. LEVEL CODE DEPT FT 0 0 0 0 3 4 0 1 68 GR CSG 22 API 0 0 0 0 3 4 0 1 68 ***** FILE TRAILER ***** ( 56) LISWRT.003 90/04/03 1024 LO *5*** END LOGICAL FILE 56 LOGICAL RECORDS ****5 5729 FRAMES READ FROM 46 RECORDS, COMPUTED FRAME SPACING= 0.5000 FT 5729 DATA FRAMES FROM STATISTICS FOR DEPTH CH MNEM SID CURVE MINIMUM MAXIMUM 1 GR CSG 1 9.28125 87.8750 END LOGICAL FILE - 3 15.50 THROUGH 2879.50 RECORDS 10 THROUGH 55 15.5 TO 2879.5 MEAN STD-DEV SAMPLES 27.7190 11.0665 5729 START LOGICAL FILE - 4 ***** TAPE TRAILER 1) LISWRT 90/04/03 REEL TRAILER 5**** McCORD-LEWIS ENERGY SERVICES - PETROS WELL LOG ANALYSIS SY ( 2) LISWRT 90/04/03 END LOGICAL FILE~- 4 ---- END OF INPUT -- McCORD-LEWIS ENERGY SERVICES - PETROS WELL LOG ANALYSIS SY