Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout190-028MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, August 10, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC Y-27 PRUDHOE BAY UNIT Y-27 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 08/10/2023 Y-27 50-029-22019-00-00 190-028-0 W SPT 8624 1900280 2156 919 921 918 922 162 397 392 388 4YRTST P Austin McLeod 7/9/2023 MITIA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT Y-27 Inspection Date: Tubing OA Packer Depth 265 2399 2370 2359IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM230710203029 BBL Pumped:6.3 BBL Returned:6 Thursday, August 10, 2023 Page 1 of 1           MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Reg /q DATE: Monday, July 15, 2019 P.I. Supervisor �9 �` Z(1. 1 SUBJECT: Mechanical Integrity Tests BP Exploration (Alaska) Inc. Y-27 FROM: Austin McLeod PRUDHOE BAY UNIT Y-27 Petroleum Inspector Ste: Inspector Reviewed By: P.I. Supry OBrZ-- NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT Y-27 API Well Number 50-029-22019-00-00 Inspector Name: Austin McLeod Permit Number: 190-028-0 Inspection Date: 7/4/2019 Insp Num: mitSAM190704193949 Rel Insp Num: Well Y-27 IType PTD 1900280 Type BBLPumpPump d 5 Interval 4YRTST Notes: MIT -IA ' Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min W 'ITVD 8624 Tubing 899 900 ' 898 - 898 ' SPT Test psi �I56 IA 4R 2350 -. 2340 - 2935 Returned 5.2 OA 209 402 - 399 398 - — P/F P v Monday, July 15, 2019 Page I of I MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim DATE: Wednesday,July 08,2015 Regg P.I.Supervisor ��l I 7I¢c V r6 SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC Y-27 FROM: John Crisp PRUDHOE BAY UNIT Y-27 Petroleum Inspector Src: Inspector Reviewed By: P.I.Suprv,I NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT Y-27 API Well Number 50-029-22019-00-00 Inspector Name: John Crisp Permit Number: 190-028-0 Inspection Date: 7/4/2015 Insp Num: mitJCr150706055953 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well Y-27 - �ype In) C'' TVD 8624 'Tubing 3007 " 3009 1 3014 • 3013 -- 3015 ' 3013 Interval1900280 SPT 2156 •' 688 2410 2406 2408 - 2413 2418 PTD Type Test Test psi IA yP—--- P� p - ----- OA - - - 4YRTST I ✓ 164 306 1 305 306 r 310 315 Notes: Retest required Test result inconclusive :2 Wednesday,July 08,2015 Page I of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim ReDATE: Wednesday,July 08,2015 gg � P.I.Supervisor -7161,c- SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC Y-27 FROM: John Crisp PRUDHOE BAY UNIT Y-27 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry:L- NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT Y-27 API Well Number 50-029-22019-00-00 Inspector Name: John Crisp Permit Number: 190-028-0 Inspection Date: 7/4/2015 Insp Num: mit1Cr150706060316 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well! Y-27 Type Inj C''ITVD 8624 Tubing 2877 2873 ? 2871 - 2867 - 1900280 SPT 2156 1004 2408 " 2398 ' 2393 - PTD Type Test Test psi IA Interval ' 4YRTST P/F P OA 188 298 294 I 290 " Notes: Test procedure used after previous deemed incomplete BPX bled to IA from 2418 to 1004 psi Manual choke was closed to reduce injection pressure on the tubing 3013 psi to 2877 psi Tubing pressure was declining during pressure test 1Q S4- SCANNER 6 ,; ; Wednesday,July 08,2015 Page 1 of 1 A OIL AND GAS CONSERVATION COM•ION RECEIVED REPORT OF SUNDRY WELL OPERATIONS AUG 0 9 2012 1. Operations Abandon U Repair Well 11 Plug Perforations U Perforate U Other L AQQ,G r Performed: Alter Casing ❑ Pull Tubing Stimulate - Frac ❑ Waiver ❑ Time Extension0 Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended Well ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development Exploratory ❑ 190 -028 -0 3. Address: P.O. Box 196612 Stratigraphit❑ Service El '6. API Number: . Anchorage, AK 99519 -6612 50- 029 - 22019 -00 -00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028289 PBU Y -27 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 13450 feet Plugs measured None feet true vertical 9YYP.68 feet Junk measured None feet Effective Depth measured 13411 feet Packer measured See Attachment feet true vertical 9195.79 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" Conductor P9 - 109 29 - 109 Surface 2825 13 -3/8" 68# L -80 28 - 2853 28 - 2698.2 5020 2260 Intermediate None None None None None None Production 12908 9 -5/8" 47# L -80 27 - 12935 27 - 8869.23 6870 4760 Liner 791 7" 26# L -80 12659 - 13450 8685.47 - 9222.68 7240 5410 Perforation depth Measured depth 13105 - 13180 feet s. - j; 0 2 tl ci b r True Vertical depth 8984.36 - 9036.29 feet Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 2316 0 1151 Subsequent to operation: 0 0 2947 0 1075 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development ❑ Service 0 d Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ❑ Gas ❑ WDSPLU GSTOR ❑ WINJ ❑ WAG Q GINJ ❑ SUSP ❑ SPLUC❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Prepared by Garry Catron 564 -4424 Printed Name Garry Catron Title PDC PE Signature £ Phone 564 -4424 Date 8/8/2012 ,ti RSDMS AUG 1 2012 ; / 0-4- Form 10 -404 Revised 10/2010 V Submit Original Only l b 6//0111' s • Packers and SSV's Attachment ADL0028289 SW Name Type MD TVD Depscription Y -27 PACKER 12562 8541.42 4 -1/2" TIW HBBP -T Packer Y -27 PACKER 12630 8586.09 4 -1/2" Baker SB -3 Packer 1 Casing / Tubing Attachment ADL0028289 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" Conductor 29 - 109 29 - 109 LINER 791 7" 26# L -80 12659 - 13450 8685.47 - 9222.68 7240 5410 PRODUCTION 12908 9 -5/8" 47# L -80 27 - 12935 27 - 8869.23 6870 4760 SURFACE 2825 13 -3/8" 68# L -80 28 - 2853 28 - 2698.2 5020 2260 TUBING 12604 4 -1/2" 12.6# L -80 27 - 12631 27 - 8667.01 8430 7500 TUBING 58 4 -1/2" 12.6# L -80 12620 - 12678 8659.77 - 8698.03 8430 7500 • • • Daily Report of Well Operations ADL0028289 ACTIVITYDATE 1 SUMMARY a c— ®§ ';- I is ,v - con rnue• rani e,_ � � er"r ='o :rrg a en Reservo Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ - 3500 bwpd. Pumped 225 gal. EC9360A (Surfactant) Average of 18.75 gph for 12 hrs. Pumped a total of 225 gal. since start of project. :t441 Pumped 938 gal. EC9378A ( Polymer) Average of 85.2 gph for 11 hrs. Pumped w1,11 4 a total of 938 gal. since start of project 6/20/2012 WSR continued on 06 -21 -2012 ?IO = 1400/450/100 WSR continued from 06 -20 -2012 Temp =Hot ( Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ - 3500 bwpd. Pumped 526 gal. EC9360A (Surfactant) Average of 21.9 gph for 24 hrs. Pumped a total of 751 gal. since start of project. Pumped 2353 gal. EC9378A ( Polymer) Average of 98.04 gph for 24 hrs. Pumped a total of 3291 gal. since start of project 6/21/2012 WSR continued on 06 -22 -2012 'TIO = 1400/450/100 WSR continued from 06 -21 -2012 Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ - 3500 bwpd. Pumped 419 gal. EC9360A (Surfactant) Average of 17.4 gph for 24 hrs. Pumped � A a total of 1170 gal. since start of project. Pumped 2393 gal. EC9378A ( Polymer) Average of 88.375 gph for 24 hrs. Pumped a total of 5684 gal. since start of project 6/22/2012 WSR continued on 06 -23 -2012 T /I /O = 1266/640/320 WSR continued from 06 -22 -2012 Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3500 bwpd. . Shut down for 12 hours, Flow meters at GC2 and In well Y -27 where not showing the same rate of PW injection. They believe the sensor in the well house was not reading correctly, we will take reads off the gage in Mod 54 for BWPD rate. Pumped 212 gal. EC9360A (Surfactant) Average of 17.6 gph for 12 hrs. Pumped a total of 1382 gal. since start of project. Pumped 1096 gal. EC9378A ( Polymer) Average of 91.3 gph for 12 hrs. Pumped a total of 6780 gal. since start of project WSR continued on 06 -23 -2012 6/23/2012 • • Daily Report of Well Operations ADL0028289 T /I /O = 1120/580/220 WSR continued from 06 -23 -2012 Temp =Hot ( Brightwater Reservoir Sweep Mod) �� f Pumping brightwater chemicals down TBG while on water injection @3500 bwpd. 4 ir - Pumped 469 gal. EC9360A (Surfactant) Average of 19.5 gph for 24 hrs. "i Pumped a total of 1851 gal. since start of project. Pumped 2281 gal. EC9378A ( Polymer) Average of 95.04 gph for 24 hrs. Pumped a total of 9061 gal. since start of project WSR continued on 06 -24 -2012 6/24/2012 171 /0 = 1095/510/220 WSR continued from 06 -24 -2012 temp =Hot ( Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection © 3500 bwpd. Pumped 420 gal. EC9360A (Surfactant) Average of 17.5 gph for 24 hrs. Pumped a total of 2271 gal. since start of project. Pumped 2234 gal. EC9378A ( Polymer) Average of 93.05 gph for 24 hrs. Pumped a total of 11295 gal. since start of project WSR continued on 06 -25 -2012 6/25/2012 T /I /O = 1147/470/180 * ** WSR continued from 06- 25- 2012*** temp =Hot u � ( Brightwater Reservoir Sweep Mod) t e Pumping brightwater chemicals down TBG while on water injection @ 3500 bwpd. i' * y 4 Pumped 435 gal. EC9360A (Surfactant) Average of 18.125 gph for 24 hrs. Pumped a total of 2706 gal. since start of project. A # Pumped 2095 gal. EC9378A ( Polymer) Average of 87.29 gph for 24 hrs. tk'-y' - Pumped a total of 13390 gal. since start of project 6/26/2012 ***WSR continued on 06 -27- 2012 * ** ** *WSR continued from 06 -26- 2012 * ** T /I /O = 1160/520.220 Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3500 bwpd. Pumped 435 gal. EC9360A (Surfactant) Average of 18.125 gph for 24 hrs. Pumped a total of 3141 gal. since start of project. Pumped 2109 gal. EC9378A ( Polymer) Average of 87.875 gph for 24 hrs. Pumped a total of 15499 gal. since start of project 6/27/2012 ** *WSR continued on 06 -28- 2012 * ** • • Daily Report of Well Operations ADL0028289 ilrthleCjikriw ***WSR continued from 06 -27 -2012 T /I /O = 1164/520/220 Tem p Hot (Brightwater Reservoir Sweep Mod) ..,.� Pumping brightwater chemicals down TBG while on water injection @ 3500 bwpd. fft Pumped 457 gal. EC9360A (Surfactant) Average of 19.04 gph for 24 hrs. Pumped a total of 3598 gal. since start of project. `11 Pumped 2222 gal. EC9378A ( Polymer) Average of 92.5 gph for 24 hrs. Pumped a total of 17721 gal. since start of project ;may pa 6/28/2012 ** *WSR continued on 06- 29- 2012 * ** ** *WSR continued from 06 -28- 2012 * ** T /I /O = 1164/520/240 Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3500 bwpd. Pumped 372 gal. EC9360A (Surfactant) Average of 18.6 gph for 20 hrs. Pumped a total of 3970 gal. since start of project. Pumped 1781 gal. EC9378A ( Polymer) Average of 89.05 gph for 20 hrs. Pumped a total of 19502 gal. since start of project (Surfactant) Total job average of 18.72 gph for 212 hrs. (Polymer) Total job average of 92.42 gph for 211 hrs. Final WHPS = 1153/520/240 Valve positions= SV= closed, MV,WV,IA,OA,SSV =open 6/29/2012 Well injecting upon departure. • TREE= ' 4-1/16' 5M CNV • WELLHEAD = 13-5/8" 5M MCEVOY SA. NOTES: 1425 READINGS AVERAGE 125 ppm ACTUATOR = BAKER Y 7 WHEN ON MI. WELL REQUIRES A SSSV WHEN ON KB. ELEV = 8026' Ml. TUBING CUT IS INSIDE OVERSHOT APPROX. 1.5' IF. ELEV = 51,06' kip = 900' 11 li 2212' H 4-1/2" X NIP, ID = 3.813" Max Angle = 58° @ 6300' Datum MD = 12951' Datum TVD= thou SS 113-3/8" CSG, 68#, L-80, ID = 12,415" 1-1 2853' -■ Minimum ID = 3.725" @ 12665' • • I 12563' H4-1/2" X NIP, ID = 3.813" I 4-1/2" OTIS XN NIPPLE Z S 1 12666' 1-19-5/8" x 4-1/2" TM/ HBBP-T PKR, ID = 4.88 • i 1 12692' 1-F17 NIP, ID = 3.813" 1 I I I 12612' H4 X NIP, ID = 3.813" 1 r 1 12634' H 0 V E R SHOT, ID = 4.55" 1 12620' H TOP OF - RJE3ING CUT ZAw".1Z 1 - 1263(71n__19-5/8" x 4-1/2" BKR SB-3 PKR, ID = 3,99" I I F1264 PARKER SWS NIP, ID = 3.813" I I 1 TOP OF 7" LNR H 12669' 12666' . - I4 - 1/2" OTIS XN NIP, ID = 3,725" I • 1 11 14-1/2" TBG, 12.64, L-80, .0152 bpf, ID = 3.958" H 12678' I 7 / \ I 12678' LI 4-1/2" WLEG, ID = 3,958" 1 1 12678' H - ELMD TT NOT LOGGED 1 r - 9 - 5 / 8 " CSG, 47#, L-80, ID = 8.681" 1-1 12935' 1.--A ■ PERFORATION SUIViiVARY REF LOG: BHCA ON 03/19/90 / CBT ON 04/06/90 ANGLE AT TOP PERE 46° @ 13105' I 1-1 Note: Refer to Production DB for historical pert data 13159' MARKER JOINT SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 13105 - 13180 0 06/30/90 1 PBTO H 13411' 1 I 13195' --I TOP OF SAND A'Ave44 ******* ******** WAWA.. 1 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" —] 13450' DATE . REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/25/90 LM ORIGINAL COMPLETION 02/16/11 file/JMD ADDED SSSV SAFE I Y NOTE WELL: Y-27 11109/97 13-14 RWO 01/23/12 TMN/JMD ADDED H2S SAFETY NOTE PERMIT No:1900280 09/25/05 WTS/TLH PX PLUG SET (07/07/04) AR No: 50-029-22019-00 05/13/06 TWS/PAG PX PLUG PULLED (05/08/06) SEC 33, T11N, R13E 06/24/06 RCT/PJC SET PXX PLUG qi 2212' 07/04/06 JLJ/PAG PULL PXX PLUG (06128/06) BP Exploration (Alaska) ka) • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday, August 05, 2011 TO: Jim Regg f Re C ( Cfi 1 ' a P.I. Supervisor SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC Y -27 FROM: Bob Noble PRUDHOE BAY UNIT Y -27 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry JgL- NON- CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT Y - 27 API Well Number: 50 029 - 22019 - 00 - 00 Inspector Name: Bob Noble Insp Num: mitRCN110802162007 Permit Number: 190 - 028 - Inspection Date: 7/31/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well j Y-27 ' Inj. W ' TVD 8624 -F IA 210 2500 ' 2470 - 2455 - P.T.D 1900280 ' TypeTest SPT Test psi 2156 - OA 20 60 60 60 Interval 4YRTST P /F P ' Tubing Iwo 1100 1100 1100 Notes: ;". >t,`Y.i J."St:„iyt , 'v' s:� •t i Friday, August 05, 2011 Page 1 of 1 • . bp BP Exploration (Alaska) Inc. x fi Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 20, 2010 JAN 201l Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue t1 ' ?I� l' Anchorage, Alaska 99501 P `• ' ' ;'; "'; L►iJris C ■4sion Subject: Corrosion Inhibitor Treatments of GPB Y Pad►1 + ° "; Dear Mr. Maunder, r - 3 c;L.2. cp,r7 Enclosed please find multiple copies of a spreadsheet with a list of wells from Y Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 12/20/10 Corrosion Well Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal Y -01B 2010760 50029203940200 NA 2.5 NA 8.50 4/11/2010 Y - 02A 2011730 50029203950100 NA 0.1 NA 0.85 4/11/2010 Y - 03A 2042350 50029204110100 NA 2.2 NA 18.70 4/16/2010 Y - 04 1791050 50029204230000 NA 1 NA 5.10 4/11/2010 Y - 05B 2081380 50029204360200 NA 3.3 NA 20.40 4/15/2010 Y - 06A 2042510 50029204310100 NA 0.7 NA 3.40 4/16/2010 Y -07A 2071050 50029205600100 14.5 2.0 0.3 NA 1.70 8/4/2010 Y - 08A 1880560 50029205720100 NA 4 NA 15.30 8/5/2010 Y - 09A 1970830 50029205790100 ' 19 1.5 3.6 NA 17.00 8/4/2010 Y -10A 2042500 50029205870100 19 3.0 8.75 NA 54.40 8/6/2010 Y - 11C 2051640 50029205130300 NA 0.1 NA 0.90 4/14/2010 Y - 13 1811120 50029206340000 NA 0.4 NA 3.40 4/15/2010 Y - 14B 2011010, 50029218320200 NA 3.8 NA 20.40 4/10/2010 Y - 15A 2010890 50029209400100 NA 2.1 NA 11.90 4/10/2010 Y - 16 1830490 50029209320000 18.8 2.0 1.7 NA 10.20 8/4/2010 Y - 18 1830290 50029209160000 NA 0.8 NA 5.10 4/9/2010 Y - 19 1880960 50029218570000 NA 0.2 NA 0.85 4/15/2010 Y - 20A 2010250 50029215870100 NA 1.5 NA 11.90 4/14/2010 Y - 21A 1950370 50029215740100 NA 0.1 NA 1.70 4/13/2010 Y - 22A 1881150 50029215580100 NA 0.5 NA 3.40 8/4/2010 Y -23B 2031640 50029215900200 NA 1.2 NA 6.80 4/13/2010 Y -24 1861130 50029216080000 NA 1 NA 6.80 4/12/2010 Y - 25A 2081400 50029218830100 NA 0.3 NA 1.70 4/18/2010 Y - 26A 2010430 50029221910100 NA 0.3 NA 1.70 4/15/2010 Y -27 1900280 50029220190000 NA 0.5 NA 3.40 4/14/2010 ic ---->• Y - 28 1910650 50029221690000 NA 3.5 NA 28.90 4/12/2010 Y - 29A 1960910 50029221230100 NA 0.2 NA 1.70 4/13/2010 Y -30 1910150 50029221350000 NA 0.5 NA 2.60 4/13/2010 Y -31 1910560 50029221610000 NA 0.5 NA 3.40 4/12/2010 Y - 32 1910410 50029221490000 NA 0.3 NA 1.70 4/18/2010 Y - 33 1910300 50029221440000 NA 0.9 NA 6.80 4/12/2010 Y - 34A 1990040 50029221780100 NA 0.9 NA 5.10 4/11/2010 Y - 35A 2022370 50029221860100 NA 1.5 NA 10.20 4/15/2010 Y - 36 1931310 50029224000000 NA 0.9 NA 5.95 4/10/2010 Y - 37A 2020460 50029224030100 NA 0.8 NA 6.00 4/14/2010 . . STATE OF ALASKA ALASKA Oil AND GAS CONSERVATION COMMISSION 'l C (ð '7 Mechanical Integrity Test '0t1 ~ VI Email to:WintonAubert@admin.state.ak.us;BobFleckenstein@admin.state.ak.us;JimRegg@admin.state.ak.us;TomMaunder@admin.state.ak.us OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska), Inc. Prudhoe Bay / PBU / V-Pad 08/28/07 Jack Winslow \qo~o~'ð Packer Depth Pretest Initial 15 Min. 30 Min. Weill Y-27 I Type Inj. I W TVD I 8624 Tubing 1280 1280 1280 1260 Interval I 0 P.T.D.I 1900280 I Typetest I P Test psil 4000 Casing 180 4020 3980 3980 P/FI P .. Notes: AOGCC MIT -fA pre-MI swap. Witness declined. OA 90 490 460 450 Weill I Type Inj. I TVD I Tubing Interval I P.T.D.I Type test I Test psi Casing P/F Notes: OA Weill Type Inj.1 I TVD I Tubing Interval I P.T.D.I I Type test I Test psil Casing PIF Notes: OA Weill I Type Inj.1 TVD I Tubing I Interval P.T.D.! I Type test I Test psil Casing I P/FI Notes: OA I Weill I Tvpe Inj.1 TVD I Tubing I Interval! P.T.D.I I Type testl Test psi Casing I PIFI Notes: OA I TYPE INJ Codes D = Drilling Waste G=Gas I = Industrial Wastewater N = Not Injecting W = Water MIT Report Form BFL 9/1105 TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover o = Other (describe in notes) 5GANNED SEP 1 0 2007 MIT PBU Y-27 8-28-07.xls MEMORANDUM . State of Alaska . Alaska Oil and Gas Conservation Commission TO: Jim Regg ';,) J P.I.Supervisor '\\(117(/7107 DATE: Tuesday, July 03,2007 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC Y-27 PRUDHOE BAY UNIT Y-27 Src: Inspector \qo/Od--~ FROM: John Crisp Petroleum Inspector NON-CONFIDENTIAL Reviewed By: --<rZP P.I. Suprv,_)v-- Comm Well Name: PRUDHOE BAY UNIT Y-27 API Well Number: 50-029-22019-00-00 Inspector Name: John Crisp Insp Num: mitJCr070701165105 Permit Number: 190-028-0 Inspection Date: 6/30/2007 ReI Insp Num: Packer Depth / Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. /' ~~- Well I Y-27 !Type Inj.-rw TVD I 8624 ;/1 IA I 810 I 2500 2480 2480 I i I I I ~.-1-- P.T.D! 1900280 TypeTest ¡ SPT Test psi 2156 I OA i 140 ! 320 320 320 I I ------'- i I ! Interval 4YRTST PIF P ./ Tubing ! 1450 I 1450 1450 1450 I I L-___~ --'--~ Notes: 4.6 bbl's pumped for test. No problems witnessed. SCANNED JUL 2 0 2007 Tuesday, July 03, 2007 Page 1 of 1 I1Pc 6/'Â.Jh, . STATE OF ALASKA . AL . OIL AND GAS CONSERVATION COM ION REPORT OF SUNDRY WELL OPERATIONS D D D 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Opera!. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 80.26 KB 8. Property Designation: ADL-028289 11. Present Well Condition Summary: Total Depth measured 13450 true vertical 9222.68 Effective Depth measured 13411 true vertical 9195.79 Casing Conductor Surface Production Liner Length 80 2822 12905 791 Size 20" Conductor 13-3/8" 68# L-80 9-5/8" 47# L-80 7" 26# L-80 Perforation depth: Measured depth: 13105 - 13180 True Vertical depth: 8984.36 - 9036.29 Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl o o x Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development Stratigraphic [J feet feet feet feet MD 32 - 112 31 - 2853 30 - 12935 12659 - 13450 Stimulate D Other [] Cancel Sundry Waiver D Time Extension D 306-191 Re-enter Suspended Well D 5. Permit to Drill Number: ¡¡;'" Ut 190-0280 :- M 6. API Number: E <- 50-029-22019-00-00 120 C Exploratory Service 9. Well Name and Number: = Q) g.", c n ~ = CIa ra ~ Y-27 10. Field/Pool(s): Prudhoe Bay Field/ Prudhoe Bay Oil Pool Plugs (measured) Junk (measured) ¡;o' Ut õ' = None None TVD Burst Collapse 32 - 112 1530 520 31 - 2698.2 5020 2270 30 - 8869.23 6870 4760 8685.47 - 9222.68 7240 5410 Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure o 0 0 o 0 0 15, Well Class after proposed work: Exploratory Development 16. Well Status after proposed work: Oil [J Gas [Ji WAG 4-1/2" 12.6# 4-1/2" TIW HBBP-T Packer 4-1/2" Baker SB-3 Packer 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sharmaine Vestal Printed Name Sharmaine Vestal Signatu -- L-80 30 - 12678 12565 12630 RBDMS 8Ft ,/UN :2 j 2006 Tubing pressure o o Service M WINJ Mi WDSPL [J Sundry Number or N/A if C.O. Exempt: 306-191 Title Data Mgmt Engr Phone 564-4424 Form 10-404 Revised 04/2004 ORiGif~AL Date 6/13/2006 Submit Original Only . . FRANK H. MURKOWSKI, GOVERNOR AI4ASKA OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Herry Subekti Production Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 o d--"ct \ C\0" Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, Y-27 Sundry Number: 306-191 :.:::.."'iN··jÀi:t::r: ;IJI\1oj s: 7 [i. ~JJv,-d ,,}';1t...:..~, d\ i'\:i ,_, t/ _ ' Dear Mr. Subekti: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED this ~ay of June, 2006 Encl. 190 -oQ~ G\..) "3 .1 3i } -Iv STATE oFúfì~1.?IÐJcJ ~ .f/~fl/;f( Al.A1 Oil AND GAS CONSERVATION COMM~N APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Operational shutdown U Plug Perforations 0 Perforate New Pool D 4. Current Well Class: 9. Well Name and Number: 80.26 Y-27 / 10. Field/Pools(s): PRUDHOE BAY FIELD/PRUDHOE BAY OIL POOL PRESENT WELL CONDITION SUMMARY Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): 9222.68 13411 / 9195.79 NONE Length Size MD / TVD Burst Commencing Operations: 16. Verbal Approval: Commission Representative: 17. I hereby certify that the f~egoinJ is true and correct to the best of my knowledge. Contact Printed Name ~iERRYßUBEKTI Title PRODUCTION ENGINEER x / Signature ,,""JY Phone 564-5112 Date /' /A COMMISSION USE ONLY 'rl~' Abandon U Alter casing 0 Change approved program D Suspend U Repair well 0 Pull Tubing D 1. Type of Request: 2. Operator Name: BP EXPLORATION (ALASKA) Inc. 3. Address: PO BOX 196612 ANCHORAGE ALASKA 99519 7. KB Elevation (ft): 8. Property Designation: ADL-028289 11. Total Depth MD (ft): 13450 Casing Structural Conductor Surface Intermediate Production Liner 8020" 2853 133/8" 68# L-80 12935 95/8" 47# L-80 791 7" 26# L-80 Perforation Depth TVD (ft): 8984.36-9036.29 41/2" TIW HBBP-T PACKER 41/2" BKR SB-3 PACKER Perforation Depth ~ft): 13105-13180 Packers and SSSV Type: 12. Attachments: Description Summary of Proposal ~ Detailed Operations Program D BOP Sketch D 14. Estimated Date for Date: \jjr;ì+- ,í5' 1b~ n ,(1>, rJpnr ./,};) L "ilJ Û Development Stratigraphic D D ;è Perforate U Waiver U Stimulate D Time Extension 0 Re-enter Suspended Well D 5. Permit to Drill Number: 190-0280 /" "., ", .: Other U / Exploratory D Service 0 6. API Number: 50-029-22019-00-00 / Junk (measured): NONE Collapse SURF-110 SURF-2853 SURF-110 SURF-2698.20 1530 5020 520 2270 SURF-12935 12659-13450 SURF-8869.23 8685.47-9222.68 6870 7240 Tubing MD (ft): 4760 5410 Tubing Size: 4 1/2" 12.6# Tubing Grade: L-80 / 12678 Packers and SSSV MD (ft): 12565 /" 12630 / 13. Well Class after proposed work: Exploratory D Development D /l 15. Well Status after proposed work: ~/sy.606 Oil D Gas 0 Plugged D ~ WAG 0 GINJ D WINJ 0 Service 0 Abandoned WDSPL o D prepared by Gary Preble 564-4944 HERRY SUBEKTI ~/L4Jó l 5/22/2006 Sundry Number: L?t1 ( ~.,.., J q I Conditions of approval: Notify Commission so that a representative may witness ". Plug Integrity 0 BOP Test D Mechanical Integrity Test ¡if Location Clearance 0 Other: M-C T r Ov.J..~ & . ~{[j tOMMISSIONER Fo~10403R,~"d07l2005 0 RíG ~A L Approved by: RSDMS 8Ft (] Ú 2D06 - APPROVED BY THE COMMISSION b,v ,()b Date: Submit in Duplicate To: . . C. Olsen I Jerry Bixby GPB Well Ops Team Leaders Date: May 12, 2006 AFE: PBYPDWL27-N From: DeWayne R. Schnorr Design Engineer 3. 4. 5. 6. Subject: Y-27; Tubing Punchers I Bradenhead Weld I Patch lOR: 200 Surveillance Est. Cost: $60,000 Please 1. 2. erform the followin rocedure s : S Set TTP, Perf wI TBG Punchers F CMIT TxlA to 2500 si, Circ. out IA & TBG . Coordinate wI WIE to do the followin ste 24 hrs before Weld. o Weld Bradenhead, Freeze Protect, MIT-OA to 2000 si. S Pull X Plu E Run Jewele GR/CCL 10 , Patch tubin uncher holes TTS Patch F MIT-IA to 3000 si. Establish LLR if it fails. Status: Last Test: Max Deviation: Perf Deviation: Min. 10: Last TO tag: Last Downhole Ops: Latest H2S level: Water Injection well. 11/03/2002: 1219 BWPD at 767 psi. 58 degrees @ 6300' 46 degrees @ 13105', top perf 3.725" @ 12665' --- 4-1/2" XN nipple 01/15/1997: 13,232' - IPROF 05/08/2006: PDS Caliper --- Logged from 12680' to surf. NA --- Water injection well. Well Y-27 is a WAG well, that was worked over 11/09/1997. Last injection was water on 11/03/2002. Well was shut-in on 06/04/2003 due to a leak in the Bradenhead. A plug was set in the X nipple on 07/07/2004. It has been shut-in since then. The objective is to put this well back on water injection after the Bradenhead has been welded. The X plug was pulled from the X nipple at 2212' and a tubing caliper was run from the tubing tail to the surface (05/09/2006). This caliper information was used to determine where to shoot holes in the tubing, so that the tubing and the IA fluids may be changed out to inhibited water. Then the Bradenhead will be welded. After that is completed, a Tubing Patch will be run and set over the holes in tubing so that well integrity may be established again. Well will be placed back on water injection. Please contact Herry Subekti at 564-5112 (wk) or Jennifer Julian at 564-5663,274-0929 (hm) or 240-8037(cell) with any questions or comments. cc: w/a: Well File . . Y-27 Tubing Puncher / Bradenhead Weld / Tubing Patch Procedure Note: X Plua @ 2212' has been pulled and PDS Caliper run from TT to Surface. Note: PDS Caliper has been evaluated and the Tubina Puncher Holes are to be shot from 12503'-12504' (2 ft below the tubina collar at 12501'. This is the first full joint above the Packer - see attached caliper report. This information is based on PDS caliper (05/08/2006) ). S: Slickline --- Set TTP in X Nipple / Shoot Tubing Puncher Holes 1. Set TTP in X Nipple @ 12553'. 2. Gently tag TTP for tie in and pull up to and shoot from 12503'-12504' with 1 ft of tubina punchers loaded 4 spf. F: CMIT-TxIA / Circulate out the well. 3. CMIT TxlA to 2500 psi. Establish LLR if it fails. Coordinate with WIE to do the followina step 24 hours before Weld. 4. Circulate out well, pumping inhibited water down lA, taking returns to FL, 1.5 times volume. 0: Weld Bradenhead / Freeze protect / MITOA 5. Weld Bradenhead 6. U-tube Freeze Protect into tubing and IA. 7. MITOA to 2000 psi. (Pending results of NDE). S: Pull TT Plug / Drift with Dummy Patch 8. Pull TT Plug. 9. Drift tubing with 3.7" Dummy Patch. E: Patch Holes in Tubing 10. RU EL. Run GR/CCL as jewelery log from 12800' to 12400'. Tie-in with PDS caliper (05/08/2006), which is approximately, on depth with Driller's depth. 11. Set patch across holes in tubing from 12490'-12515'. F: MIT -IA 12. MIT-IA to 3000 psi. Establish LLR if it fails. . WELL SERVICE REPORT WELL JOB SCOPE Y -27 WELL HEAD REPAIR DATE DAILY WORK 5/8/2006 CALIPER TUBING; PULL MECHANICAL PLUG COST CODE PLUS KEY PERSON PBYPDWL27-M SWCP-CASTLOO MIN ID DEPTH 3.725" 12665 FT . UNIT SWCP #8 DAY SUPV BULLOCH NIGHT SUPV SMITH-T TTL SIZE 4.5 " _..~--~_._-......- ......~_...._.~~ DAILY COST CUMUL TOTAL ~1J.,66~3[==-=-~==-==j1~1:~~ª $2,880 I $2,880 $14,543 $14,543 TOTAL FIELD ESTIMATE: SAFETY NOTES ***RIGONLOC. , .. ~.~._._..._,..._.~...__ ····.··_···~·.···__·.~w_.~..__.... ..-...... ... ~_.._..._--~ -..--~~.-' .,.,._._.--_.~.-~ . . PDS /ÜPOI\T Ti\BULATION 511 EEl I D:': p;)'!'. ,I. III III "1 ':1 ~, , h II I :~, 'I'"., i "t I ), I : " . \!,~0'f' n. .' 1-:: I;:, I '\'1c,,;I I '"7Õr 2 ft ( t.b. i:n'Þl:; f>(_d1c.ht~) J.:;Jf¿ /0 W c. 0 n ct V> ./ :? 6'0 11 J :;. V"'"{}.{.t.e.. ( I..tSc>.:!> " - I' t.(~7CJ..~,.) - / r t.) Lj sr1-'· " ( II~ '~~b¡ ...~..-1 ~ >.: -- -- ..~- I. t·-· ~. , ..... 'rè'~ ~. :;', .... '.' m" 11 - + -.-......... / : . .... I l- t ~.<: "1 r tc",! ~; . ¡ ""\ ..... ~......_. .~ ~~ ... t-';':.. .«:: ... ~ ,~~~~ ~. ..~ "~fm.. ~; ?t... ....~~ -:- ..i J ~-r~~'" .. ...~ , !-, . ....~.¿~ ¡~. '"ª i___ J _"r ..". ........ .. t~-~:~ ;;:~. .. ! i~'::;; t _~~J~~ .~. OF LJ ~r ~ ._~ r I· .~"'b' ... ..~. . r .. _ I ~ OF 7· ~:!:t't;.,. ...1 ·'trF-ç I "'-<E~' _ >. " 'i --~. ..- -!-. , 1- ....~ .¡::--''"''-. r--;,) - , ·-t.., . t ~: -.:::~~ <~ ..... ::1'--' ..,- ~ I;:;. r "~r~ 1 ~ ",...j . . .. +--. - -. /.{'l,OO -""-"'"",, · 'I~"'BA l ~¡r.. irl- r"~ !: I · , -,..;--. I . : . 1 : · · I , · --i.i. : X N , . · · , . ì , ....... ': '4 ....., t ~r .~ :,':;" ~ _a___, . . ~ L. . -. ~ "'. ..., f~ f I {t "r?~ -"- . ¡ .. ". j'L , s~s . KER P ~ l NIPP E 1270 Q .. , TREE WELLHEAD ACTlflUOR'= 4-1/16" 5M CIW 13-5/8" 5M MCEVOY BA KER 80.26' 5106' 900' 58 6300' . ¡mum 10 = 3.725" @ 1 4-1/2" OTIS XN NIPPLE 12659' 12678' Y-27 PERFORATION SUMMARY LOG BHCA ON 03/19/90 / ON 04106190 ANGi_EA T PERF 46 @ 13105' to DB for historical perf data Opn/Sqz OA TE 06/30/90 13450' COMMENTS ORIGINAL COMPLETION RWO DA TE REV COMMENTS NOTES: TUBING CUT IS INSIDE HOT APPROX. 1.5' 2212' --14-1/2" X NIP, 10 = 3.813" I 12553' 12565' 12592' 12612' 12634' 12620' 12630' 12644' 12665' --14.1/2" X NIP, 10 = 3.813" I -14-1/2" X NIP, 10 = 3813" I --1 OVERSHOT, 10 = 4.55" I -1 TOP OF TUBING CUT I -J 9·5/8" x 4·1/2" BKR SB-3 PKR, 10 = 3.99" -14-1/2" PARKER SWS NIP, 10 = 3.813" I 12678' -J4-1!2" WLEG, 10 = 3.958" I 12678' H ELMO IT NOT LOGGED I 13159' 13195' --1 TOP OF SAND I PRUDHOE BA Y UNIT Y-27 PERMIT No: "1900280 API No: 50·029-22019-00 SEC 33, T11 N, R13E Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Email to: Tom_Maunder@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska)Inc. Prudhoe Bay / PBU / Y-PAD 07/10/03 Pat Lattner John Spalding WelIIY-11B P.T.D. I1951110 Notes: WelIIY-27 P.T.D.1900280 Notes: P.T.D. Notes: Well P.T.D. Notes: P.T.D. Notes: I Packer Depths (ft.) I Pretest Initial 15 Min. 30 Min. I I ~"~'"~' I ~I M°'~DI ~'~'1 ~'~°~'1 ~'"q ~0~0~01 ~01 ,.t~q ~ I I mypetestl P I Testpsil 21511 I Casngl 0+ 2500 24501 24401 P/FI PI I ~,~. I ~I~,~I ~,~q ~,~q ~,~q vAcI v~ v~I v~q ,~,~q ~ I Type test I P I Test psiI 21561 I Casingl 0+1 25001 24601 24601 P/FI P Type Type Inj. Typel~. Test Details: 4-year MITIA's. Neither well was injecting. TYPE INJ Codes F = Fresh Water Inj (3 = (3as Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover O = Other (describe in notes) MIT Report Form Revised: 06/19/02 ,~CANNE .,,.~ AUG 0 1 2003 2003-0710_MIT_PBU_Y-27.xls MEMORANDUM ,. State of Alaska Alaska Oil and Gas Conservation Commission TO: Randy Ruedrich Commissioner THRU: Jim Regg P.I. Supervisor FROM' DATE: July 10, 2003 ,~\\&~0~SUBJECT: Mechanical Integrity Tests ' , Y- Pad 1 lB and 27 John H. Spaulding Prudhoe Bay Unit Petroleum Inspector Prudhoe Bay Field NON- CONFIDENTIAL Welll Y-11B P.T.D.I 1951110 Notes: WellI Y-27 P.T.D. I 1900280 Notes: P.T.D.I Notes: WellI P.T.D.I Notes: P.T.D.I Notes: Packer Depth Pretest Initial 15 Min. 30 Min. I TypetestI P ITestpsil 2151 I Casingl 0+ I 2500 I 2450 I 2~0I P/F I ~ Type testI I Testpsil 2156 I CasingI 0+ I 25001 2460 I 24601 P/F I P IType Inj. Type test IType Inj. Type test Type Inj. Type test Type INJ. Fluid Codes' F = FRESH WATER INJ. G = GAS I NJ. S - SALT WATER I NJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover O= Other (describe in notes) Test's Details I traveled to BPX's Y pad WOA to witness the 2 MIT's on the above wells. Pat Lattner was the BPX rep. for the tests today. The pretest pressures were monitored and found to be stable, the standard annulus pressure tests were performed with both wells meeting the AOGCC criteria fo a successful MIT. Neither well was injecting at the time of the tests. M.I.T.'s performed: 2 Number of Failures: 0 Total Time during tests: 4 Attachments: cc: MIT report form 5/12/00 L.G. 8C, ANN~D AUG (~ 1 2003 2003-0710_M IT_PB U_Y- 11 Bis.x Is 7/18/2003 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSIOi~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate__ Plugging__ Pull tubing X Alter casing __ Repair well __ Perforate__ Other__ 2. Name of Operator BP Exploration 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1448' SNL, 384' WEL, SEC. 33, T11N, R13E At top of productive interval 840' SNL, 2554' WEL, SEC. 05, TION, R13E At effective depth 908' SNL, 2774' WEL,, SEC. 05, TION, R 13E At total depth 917' SNL, 2801' WEL, SEC. 05, TION, R13E 5. Type of Well: Development __ Exploratory __ Stratigraphic __ Service X ORIGINAL 6. Datum elevation (DF or KB) KBE = 83. 76 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-27 9. Permit number/approval number 90-28 / 95-171 10. APl number 50- 029-22019 11. Field/Pool Prudhoe Bay Field/Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 1345O 9223 13411 9196 feet Plugs (measured) feet feet Junk (measured) feet Casing Length Size Structural Conductor 110' 20" Surface 2824' 13-3/8" Intermediate 12926' 9-5/8" Production -- Liner 791' 7" Perforation depth: measured 13105'- 13180' Cemented Measured depth True vertical depth 139' 139' 4423 cu fl 2853' 2698' 2781 cu fl 12935' 8869' 245sx 12659'- 13450' 8685'- 9223' true vertical subsea FEB 26 1996 Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 12634' Alaska ~1 & Gas Cons. Commissio~ Anchorage Packers and SSSV (type and measured depth) 9-5/8" TIW HB-BP-T Packer at 12565~ 4-1/2" SSS V at 2212' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 16. Status of well classification as: Oil Gas Suspended Service WAG Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~/~ / ~~'~' TitleSeniorDrillin~iEn~lineer Form 10-404 Rev 06/1 b-'Y88 Date SUBMIT IN DUPLICATE~::~, BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: Y-27AI BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 11/05/95 04:00 SPUD: RELEASE: OPERATION: DRLG RIG: DOYON 14 WO/C RIG: DOYON 14 11/06/95 (1) TD:13450 PB:13411 11/07/95 (2) TD:13450 PB:13411 11/08/95 ( 3) TD:13450 PB:13411 11/09/95 ( 4) TD:13450 PB:13411 TESTING BOP STACK MW: 0.0 MOVE RIG. WELLHEAD WORK. ACCEPT RIG 11/05/95 AT 16:00. FLUID SYSTEM WORK. N/D SURFACE TREE. N/U BOP STACK. TEST BOP STACK. R/U TO RUN COMPLETION MW: 0.0 TESTED BOP STACK, WITNESS WAIVED BY JERRY HERRING, AOGCC. L/D TUBING T/28'. CBU, L/D TUBING TO SSSV. REMOVED EMERGENCY HANG OFF ASSEMBLY. REMOVED CASING HANGER AND SEAL ASSEMBLY RUNNING TOOL. L/D TUBING T/12620'. R/U TO RUN COMPLETION. RAN TUBING T/12637' MW: 0.0 RAN 4-1/2" TUBING T/12637' LOCATE TUBING STUB AT 12633', WASH OVER T/12637'. SPACE OUT, M/U HANGER/LANDING JOINT. CBU AT 12607', PUMPED DIESEL IN ANNULUS. U-TUBED FOR FREEZE PROTECTION. RELEASED @ 0600 HRS MW: 0.0 RUN 4-1/2" SINGLE COMPLETION. SPACE OUT TUBULARS. LAND TUBING. RU CAMCO WIRELINE EQUIP. COMPLETE DOWNHOLE MEASUREMENT TOOLS T/12650'. RU ATLAS. RUN GR/CCL F/12450' T/12660' RU CAMCO TO SET RHC PLUG WITH X NIPPLE @ 12608'. RD CAMCO. COMPLETE RUN WITH NIPPLE PLUG T/12612' RD BOP STACK, DROP SETTING BALL, INSTALL 2-WAY CHECK. ND BOP'S. INSTALL XMAS TREE & TEST ALL VALVES & TEST FLANGE. REMOVE BOP TEST PLUG ASSY. SET TIW PACKER @ 12565' & TEST TUBING. TEST 9-5/8". WITNESS WAIVED BY DOUG AMOS WITH AOGCC. RD RIG SERVICES, INSTALL BPV, CLEAN LAST PIT & PREP TO MOVE. RIG RELEASED @ 0600 HRS. SIGNATURE: (drilling superintendent) DATE: LARRY GRANT . Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~.~f ~ ~ DESCRIPTION B-22 (32-32-11-14) ' ' .1 CN FINAL BL 1 CN FINAL RF SEPIA ~ 1 CN/GR FINAL RL & RF H-35 ~ ~ 1 PFC/PERF FINAL BL&RF 1 JEWELRY FINAL BL&RF Date: 15 November 1995 Transmittal of Data Sent by: US MAIL ECC No. Run # ' 1 ' 1423.08' Run ~ 1 Run ~ 1 3901.04 Run ~ 1 4241.04 Run ~ ! 5694.06 Run ~ 1 5862.07 Run ~ 1 6460.01 Run ~ 1 6503.01 Run ~ 1 Please sign and return to: Attn. Rodney D. Pau!son Atlas Wireline Services RECEIVED 5600 B Street suite =0z NOV 0 1995 Anchorage, AK 99518 / Naska Oil & Gas Cons. Commiss(O~ Or to (907) 563-7803 Received by: - Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 9 November 1995 Transmittal of Data ECC #: 4241.03 Sent by: HAND CARRY Data: CCL Dear Sir/Madam, Reference: Y-27 PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: 1 CCL FINAL BL+RF Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 FAX to (907) 563-7803 Received by :~~ ~~~/ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISS~uN APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __ Change approved program __ Pull tubing X Variance __ Perforate __ Other__ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) BP Exploration Development __ 80.26 AMSL Exploratory __ 3. Address Stratigraphic__ 7. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 Service x Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1448' SNL, 384' WEL, SEC. 33, T11N, R13E At top of productive interval 840' SNL, 2554' WEL, SEC. 05, TION, R13E At effective depth 908' SNL, 2774' WEL,, SEC. 05, TION, R13E At total depth 917' SNL, 2801' WEL, SEC. 05, TION, R13E ORIGINAL Y-27 9. Permit number 90-28 10. APl number 50- 029-22019 11. Field/Pool Prudhoe Bay Field/Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 13450 feet Plugs (measured) 9223 feet 13411 feet Junk(measured) 9196 feet Casing Length Size Cemented Measured depth Structural Conductor 110' 20" 139' Surface 2824' 13-3/8" 4423 cuft 2853' Intermediate 12926' 9-5/8" 2781 cuft 12935' Production -- Liner 791' 7" 245 sx 12659'- 1345o' Perforation depth: measured 13105'- 13180' true vertical subsea Tubing (size, grade, and measured depth) 4-1/2" L-80 to 12630' with 4-1/2" tailpipe to 12677' Packers and SSSV (type and measured depth) 9-5/8" Baker packer at 12630'; 4-1/2" SSSV at2294' True vertical depth 139' 2698' 8869' 8685'- 9223' & (}as Cons. Anchorage 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation November 5, 1995 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Service Water Injector Suspended __ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed 7~/~~-~-- Title Senior Drilling En~ineer FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test ~?' Location clearance __ Mechanical Integrity Test ~ Subsequent form required 10- /-{ Original Signed By Approved by order of the Commission David W. Johnston [ Approva, No. ,~pproved Copy. Returned ..... Co~missi~ner - Date ?//~"~ ~'"" Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE To: AOGCC September 25,1995 From' Subject: A Steve Shultz Prudhoe Bay Drilling MB 12-1 Tubing Change out of Y-27i 1. Pre-rig work: CTU sandback and E-line chemical cut tubing @ 12,620' 2. MIRU workover rig and kill well 3. ND wellhead, NU BOP's 4. Pull 4 1/2" tubing 5. RIH with overshot and engage tubing stub at 12,620', rotate anchor free, POOH 6. RIH with packer mill and PRT, mill and pull packer 7. Cleanout to PBTD 8. Run 4 1/2" tubing completion. T~-r ~';"3 ~ HooO ~'~. 9. Test tubing and annulus to 3500 psi, RDMO, The objective of this workover is to replace leaking tubing. Prepared by: ~)ri'[ll'ng Engineer ' "-""~ o~? 27 !995 Alaska 0d & 6as Cons. Commission Anchora~Te TREE: 4 1/16'1 ' 5M FMC Y 27 KB. ELEV = 80.26' WELLHEAD: 13 5/8" - 5M McEVOY I BF. ELEV = 51.06' ACTUATOR: BAKER SSSV LANDING NIPPLE I 2294'1 (ITl) (0TIS)(3.813" ID) CMT'd I ~ ~ 13 3/8", 68#/ft, ~~ ~k GAS LIFT MANDRELS L-80, BTRS~ (OTIS w/1-1/2" RA LATCH) NQ MD(BKBI TVDss DEV 5 3344' 2924' 53° I KOP: 500' I 4 7545' 5379' 54° 3 10,289' 7107' 48° MAX ANGLE: 58° @ 6300' 2 12,127' 8259' 51° I I 12,589' 8559' 49° 4 1/2", 12.6#/ft, L-80, TDS, TUBING TUBING ID: 3.958" CAPACITY: 0.0152 BBL/FT I I 4 1/2 .... SWS" NIPPLE (PARKER) (3.813" ID) I 12,618'1 ~ BAKER TUBING ANCHORI 12,629'1 ~ El~ 9 5/0" BAKER PACKER i (SB-3) (3.99"19) I 12'6301 4 1/2", 12.6 #/ft, L-80 TAILPIPE ~o. o. 112.659' I I .... sws,, I I 7" LINER 2 (PARKER) (3.813" ID) 12,644' 4 1/2 .... XN" NIPPLE (OTIS) (3.725" ID) I 12,665'1 4 1/2" OTIS WLEG I 12,678'J 9 5/8", 47#/ff, I 12,935,J~l [ L-80, NSCC ELMD I 12,678'I · PERFORATION SUMMARY REF LOG: ATLAS-BHCA 3-19-90 TIE-IN LOG: SWS - CBT 4-6-90 SIZE SPF INTERVAL OPEN/SQZ'D 3 3/8"6 13,105- 13,180'OPEN/6-30-90 MARKER JOIiT 113,159' I A, iaska UII & Gas CuFm. Commissior~ DATE REV. BY COMMENTS PRUDHOE BAY UNIT 3-25-90 LM INITIAL COMPLETION WELL: Y-27 (31-05-10-13) 7-01-90 RED INITIAL PERES APl NO= 50~29-22019 SEC 33; TN 11N; RGE 13E 8-16-91 A. TEEL REVISED w/ADDITIONS 8/22/91 REvIS'ED B P EXPLORATION STATE OF ALASKA AU--,~.,,,A OIL AND GAS CONSERVATION COMMIS ,J REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging,__ Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1448' SNL, 384' WEL, SEC. 33, T11N, R13E At top of productive interval 840' SNL, 2554' WEL, SEC. 05, TION, R13E At effective depth 908' SNL, 2774' WEL, SEC. 05, TION, R13E At total depth 917' SNL, 2801' WEL, SEC. 05, TION, R13E 12. Present well condition summary Total depth: Effective depth: 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 80.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-27i (31-05-10-13) PBU 9. Permit number/approval number 90-28 / 10. APl number 50- 029-22019 11. Field/Pool Prudhoe Off Pool measured 13450 feet Plugs (measured) true vertical 9223 feet measured 13411 feet Junk (measured) true vertical 9196 feet Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20" 139 139 S u rfac e 2824 13-3/8" 4423 cuft 2853 2698 Intermediate 12926 9-5/8" 2781 cuft 12935 8869 Production -- Liner 791 7" 245 sx 12659-13450 8685-9223 Perforation depth: measured 13105'- 13180' true vertical subsea Tubing (size, grade, and measured depth) 4 1/2" L-80 to 12630' with 4 1/2" tailpipe to 12677' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 12630'; 4 1/2" SSSV at 2294' 13. Stimulation or cement squeeze summary See Attachment ~ Intervals treated (measured) N/A Treatment description including volumes used and final pressure Gas Cons. Commission 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Date OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 5951 7966 Tubing Pressure 2225 2221 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended__ Service Water Injector 7. I hereby c(~rtify that thee forectoin.cLJs_true and correct to the best of my knowledge. Form 10-4(~4 Rev 06/15/88 "7' SUBMIT IN DUtSLIC"'ATE 7/16/94 WELL Y-27i (31-05-10-13) Addperf/Stimulation Operation A Bullhead HCL Xylene Treatment was performed using the following fluids: OPERATIONS SUMMARY PUMP 61 BBLS HCL/XYLENE INTO WELL. PUT WELL ON INJECTION. FLI. JID~ PUMPED 61 bbls. 7.5% HCL W/500 GAL XYLENE, 8 GAL ACI274, 8 GAL NF_~I, 14 GAL S500, 50 GAL FERROTROL 210, 1 GAL AG12 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 6 June 1995 Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the'data as described below: WELL ~2-~/?~H-17 (34-15-11-13) DESCRIPTION PLS FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 4241.01 5665.09 5855.02 6271.02 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please si-~n.and r. eturn I~ Petrotechnica! Data Cente~ ~? E:z~!or.~tton (Alaska) In~ 900 h.:~.~Benson Boulevard Anch =e aska 99508 ~ ,RECEIVED ,/UN 0 8 1995 Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ALA~ 3IL AND GAS CONSERVATION COMMISSIC" REPORT SUNDRY WELL OPE, ,ATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Stimulate × Plugging Perforate Alter casing Repair well Other 4. Location of well at surface 1448' SNL, 384' WEL, SEC. 33, T11N, R13E At top of productive interval 840' SNL, 2554' WEL, SEC. 05, TION, R13E At effective depth 908' SNL, 2774' WEL, SEC. 05, TION, R13E At total depth 917'SNL, 2801' WEL, SEC. 05, TION, R13E 5. Type of Well: Development Exploratory Stratigraphic Service X 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical ORIGINAL 13450 feet Plugs (measured) 9223 feet 13411 feet Junk (measured) 9196 feet 6. Datum elevation (DF or KB) KBE = 80.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-27i (31-05-10-13) PBU 9. Permit number/approval number 90-28 / 10. APl number 50- 029-22019 11. Field/Pool Prudhoe Oil Pool Casing Length Size Cemented Measured depth Structural -- Conductor 110 20" 139 Surface 2824 13-3/ 4423 cu ft 2853 Intermediate 12926 9-5/8" 2781 cuft 12935 Production -- Liner 791 7" 245 sx 12659-13450 Perforation depth: measured 13105'- 13180' ,, True vertical depth BKB 139 2698 8869 8685-9223 RECEIVED r' ':~ Tub{no Pressure 1922 1966 Date ~/~/~ SUBMIT IN D~PLI~ATE~ true vertical subsea Tubing (size, grade, and measured depth) 4 1/2" L-80 to 12630' with 4 1/2" tailpipe to 12677' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 12630'; 4 1/2" SSSV at 2294' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) N/A Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 2398 5163 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas . Suspended . Service Water Injector 17. I hereby certify that the foregoij3g is true and correct to the best of my knowledge. Signed ~ .,q,a.,,,, ~_~ (1 ~c~ Title Form 10-40Jr Rev 06/15/88 ~-- Senior Technical Assistant l 10/17/93 fjh 6/27/94 WELL Y-27i(31-05-10-13) Stimulation Operation A HCL Acid Wash Treatment was performed using the following fluids: SUMMARY: PERFORMED WORK IN NARROW WINDOW WHEN DRLG RIG 18-E ,ON ADJACENT LOCATION, WAS WOC AFTER SURFACE PIPE. VERY TIGHT FIT W/RIG. RAN IN W/2.75" SWIRL NZL. TAGGED FILL IN PERF INTERVAL @ 13132. TRIED JETTING FILL W/SEA WTR AND GOT STUCK AYI~R GETTING 17 FT INTO IT. DECIDED FILL MUST BE PREDOMINATELY CARBOLITE. WASHED REMAINING OPEN PERF INTERVAL W/1000 GAL OF 15% HCL W/10% XYLENE. INITIALLY THE PERFS WOULD NOT TAKE ANY FLUID. AS SOON AS ACID REACHED THE PERFS THE INJECTIVITY INCREASED. FINAL INJECTIVITY WAS 1.1 BPM @ 1100 PSI. WASH ED OUT OF HOLE TO REMOVE AS MUCH BLACK SLUDGE WATER AS POSSIBLE BEFORE RESUMING INJECTION. GAVE WELL BACK TO PAD OPERATOR TO PUT BACK ON INJECTION. FLUIDS PUMPED: 154 BBL FILTERED SEA WTR 24 BBL 15% HCL 27 BBL MEOH BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 BP CASED HOLE FINALS DATE: 04/16/92 T# 83419 Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. s-o3 8/__.,GASj~ LIFT SURVEY 03/22/92 #1 Y-10 INJ 03/23/92 #1 Y-24~--1~3 INJ 03/25/92 #1 D-27 ~-$3 PROD-F 04/01/92 #1 Z-07~O--~/ GAS LIFT SURVEY 03/25/92 #1 A-16~-fZ~ MISC GAS INJ 03/31/92 #1 A-03g/-3~ MISC GAS INJ 03/31/92 #1 F-37~--~_ LEAK DET 03/19/92 #1 N-11A~-/Z~ GAS LIFT SURVEY 03/20/92 #1 F-48 ~/--~ TEMP 03/22/92 #1 ¥-27~o~'"~ I~ 03/23/92 #1 S-32~o-/~ ?ITS 03/24/92 #1 S-0Z~Z~I GAS LZF~ SURVEY 03/22/92 #1 A-11 ~l_~ MISC GAS INJ 03/26/92 #1 2500.00-12104.00 CAMCO 2 " 9200.00-10123.00 CAMCO 5 " 13100.00-13430.00 CAMCO 5 " 9350.00- 9644.00 CAMCO 5 " 2500.00-12738.00 CAMCO 2 " 10520.00-11084.00 CAMCO 5 " 11600.00-11915.00 CAMCO 5 " 8600.00-10400.00 CAMCO 2 " 2500.00-10200.00 CAMCO 2/5" 0.00- 3000.00 CAMCO 5 " 2500.00- 9920.00 CAMCO 2 " 12900.00-13247.00 CAMCO 5 10100.00-10548.00 CAMCO 5 " 2500.00-10674.00 CAMCO 2 " 9750.00-10050.00 CAMCO 5 " Information Control Well Records Adrian J. Martin RECEIVED APR 2 4 1992. Alaska 0il & Gas Cons. Commission Anchoraga "-'" STATE OF ALASKA -~' ~ ~t~ /-, ~:KA OIL AND GAS CONSERVATION COMMI,..aN APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well__ Alter casing __ Repair well__ Plugging __ Time extension Stimulate __ Change approved program __ Pull tubing __ Variance __ Perforate __ Other 2. Name of Operator BP Exploration (Alaska)/nc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1448' SNL, 384' WEL, SEC. 33, T11N, R13E At top of productive interval 840' SNL, 2554' WEL, SEC. 05, TION, R13E At effective depth 908' SNL, 2774' WEL, SEC. 05, TION, R13E At total depth 917'SNL, 2801' WEL, SEC. 05, TION, R13E 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 5. Type of Well: Development Exploratory Stratigraphic Service 13450 feet Plugs (measured) 9223 feet 13411 feet Junk (measured) 9196 feet 6. Datum elevation (DF or KB) KBE = 80.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-27 (31-05-10-13) PBU 9. Permit number 90-28 10. APl number 50- 029-22019 11. Field/Pool Prudhoe Oil Pool Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20" 139 139 S u rf ace 2824 13-3/8" 4423 cu ft 2853 2698 Intermediate 12926 9-5/8" 2781 cu ft 12935 8869 Production -- Liner 791 7" 245 sx 12659-13450 8685-9223 Perforation depth: measured 13105'- 13180' true vertical subsea Tubing (size, grade, and measured depth) 4 1/2" L-80 to 12630' with 4 1/2" tailpipe to 12677' RECEIV[D Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 12630'; 4 1/2" SSSVat 2~® 0il & Gas Ooas. Anchorage 13. Attachments Description summary of proposal X Detailed operations program BOP sketch × 14. Estimated date for commencing operation January 09, 1992 16. If proposal was ve.r. bally approved Oil Gas Name of approver Date approved Service Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed -~~ '/~"'~FOR COMMISSIoNTitleSupervis°rWaterf/°°d/MiscibleF/°°dusE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BQP Test Location clearance Mechanical Integrity Test ~,~ Subsequent form required 10- z~ ~. ORIGINAL SIGNED BY Approved by order of the Commission LONNIE C. S~ITH 15. Status of well classification as: Suspended Date Y//'/~' 7,,,- Com m---~iss'~;nor Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE WELL Y-27 (31-0~-10-13) Injection Proposal Well Y-27 was converted from a Prudhoe Bay prodution well into a water injection well for Hurl State Development Zone 4 on January 09, 1992. Perforations at 4 s.p.f., 90 phasing and oriented at 60 from the low side of the hole over the following intervals. Interval (MD) 13105'- 13180' 4/09/92 fjh STATE OF ALASKA ~ '~ ~''''~ ~ ,, AL. .'~A OIL AND GAS CONSERVATION COMMIS. .~N · REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging. Perforate Other X Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 Repair well 5. Type of Well: Development ~ Exploratory Stratigraphic Service X 4. Location of well at surface 1448' SNL, 384' WEL, SEC. 33, T11N, R13E At top of productive interval 840' SNL, 2554' WEL, SEC. 05, TION, R13E At effective depth 908' SNL, 2774' WEL, SEC. 05, TION, R13E At total depth 917'SNL, 2801' WEL, SEC. 05, TION, R13E 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length .. measured 13450feet Plugs (measured) 9223feet 1341/feet Junk (measured) 9196feet Size Cemented 110 2824 12926 .. 791 0" 13-3/8" 4423 cu ft 9-5/8" 2781 cu ft 7" 245 sx 13105'-13180' Measured de~h 139 2853 12935 12659-13450 6. Datum elevation (DF or KB) KBE = 80.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-27 (31-05-10-13) PBU 9. Permit number/approval number 90-28/90-707 10. APl number 50- 029-22019 11. Field/Pool Prudhoe Oil Pool True vertical depth BKB 139 2698 8869 8685-9223 true vertical subsea Tubing (size, grade, and measured depth) 4 1/2" L-80 to 12630' with 4 1/2" tailpipe to 12677' Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at 12630'; 4 1/2" SSSV at 2294' RECEIVED 13. Stimulation or cement squeeze summary 1/09/92 Convert well to water injection. Intervals treated (measured) N/A N/A Treatment description including volumes used and final pressure Alaska Oil & Gas Cons. Commi Anchorage 14. Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 210 250 1560 1488 N/A N/A N/A N/A Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 17. I hereby certify that the foregoing is true and correct to the best of my knowledge, Signed ~ ~_.~[~ Title Supervisor Waterflood/Miscible Flood Form 10'404 Rev 06/15/88 ~/~ 273 N/A 16. Status of well classification as: Oil ... Gas Suspended Service Water In/ector Date SUBMIT IN DUPLICATE BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevarcl RO. Box 196612 Ancl~orage, Alaska 99519-6612 (9O7) 561-5111 DATE: 11/25/91 T# 83036 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. GAS LIFT SURVEY 10/24/91 GAS LIFT SURVEY 10/18/91 INJ LEAK DET BRIDGE P LUG CCL GAS ENTRY LOG 5 " 10/23/91 10/29/91 10/26/91 11/03/91 15.00-12650.00 CAMCO 2 " 13900.00-14675.00 CAMCO 2/5" 9550.00-10300.00 CAMCO 5 " 12000.00-13240.00 CAMCO 2/5" 9300.00-10180.00 CAMCO 5 " 9250.00-10015.00 CAMCO 5 " 10/29/91 91 10200.00-10450.00 CAMCO Information Control Well Records Adrian J. Martin RECEIVED DEC 0 2 1991 Alaska 0ii & Gas Cons. Commissl~ ~choragg. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO' DISTRIBUTION Date :05/14/91 T#:82386 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-23 E-19 M-21 -- 5":P .,-'P- 17 C,lD .- 13o {~,,P-19 ~O '"l~ .,, S-27 U-11 W-25 -~ X-07 7-20 Gas Entry Survey 04/24/91 #1 10100-10480 Camco 5" Gas Entry/Prod-F 04/19/91 #1 11450-11690 Camco 5" Gamma -Ray 04/16/91 # 1 8300-9005.5 Camco 5" Prod- F 04/17/91 #1 12100-12445 Camco 5" GR/CCL/Pre Fmc 04/19/91 #1 8700-9178 Camco '~ 5" Gamma-Ray 04/24/91 #1 9300-9954 Camco 5" PITS 04/23/91 #1 10400-11190 Camco 5" Leak Det. 04/26t91 # 1 9500-9750 Camco 5" Prod-F 04/18/91 #1 10100-10553 Camco 5" Jewelry 04/23/91 #1 9900-11000 Camco. 5" Temp 04/27/91 # 1 3000-13132 Camco 5" Gas Entry Survey 04/17/91 #1 11100-11521 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED MAY 2 0 1991 Alaska 011 & Gas Cons. C0mmlssl0n Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevar(J P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: FROM' SUBJECT: DISTRIBUTION Information Control Well Records LR2-1 BP CASED HOLE FINALS Date:04/30/91 T#:82383 Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-~.~45. ~-J-16 ~M-28 "Q-04 --~1,~, -Y.27 Prod-F 04/12/91 #1 9560-10610 Camco 5" Gas Entry 04/09/91 # 1 9350-9740 Camco 5" PITS 04/15/91 #1 8700-8930 Camco 5" Prod-F 04/14/91 #1 9350-9610 Camco 5" Prod-F 04/12/91 #1 10200-10516 Camco 5" Gas Lift 04/11/91 #1 3000-13138 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES STATE OF ALASKA AL, .A OILAND GAS CONSERVATION COMMIS N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1448' SNL, 384' WEL, SEC. 33, T11N, R13E At top of productive interval 840' SNL, 2554' WEL, SEC. 05, TION, R13E At effective depth 908' SNL, 2774' WEL, SEC. 05, TION, R13E At total depth 917' SNL, 2801' WEL, SEC. 05, TION, R13E 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Size Structural -- Conductor 110 20" Surface 2824 13-3/8" Intermediate 12926 9-5/8" Production -- Liner 791 7" Perforation depth: measured 13105'- 13180' Stimulate x Plugging Perforate Alter casing Repair well Other 5. Type of Well: 6. Datum elevation (DF or KB) Development ~ KBE = 80.26 AMSL feet Exploratory Stratigraphic 7. Unit or Property name Service Prudhoe Bay Unit 8. Well number Y-27 (31-05-10-13) PBU 13450feet 9223feet 13411feet 9196feet Plugs (measured) Junk (measured) 9. Permit number/approval number 90-28/90-707 10. APl number 50- 029-22019 11. Field/Pool Prudhoe Oil Pool Cemented Measured depth True vertical depth BKB 139 139 4423 cu ft 2853 2698 2781 cuft 12935 8869 245 sx 12659-13450 8685-9223 true vertical subsea 8904'-8956' Tubing (size, grade, and measured depth) 4 1/2" L-80 to 12630' with 4 1/2" tailpipe to 12677' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 12630'; 4 1/2" SSSV at 2294' 13. Stimulation or cement squeeze summary 9/12/90 - hydraulic fracture of ivishak formation Intervals treated (measured) 13105'- 13180' FEB - 4 t991 Treatment description including volumes used and final pressure 2121 bbls. flush/slurr~ A~as.~ ~0Jl & Gas Cons. 88,100# 16/20 Carbolite proppanr ' , ~_~hprage 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 790 624 25 1182 211 Subsequent to operation 2050 1505 10 74 133 7 278 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,-~/~ ~-C_ ~ Title Supervisor Waterflood/Miscible Flood Form 10-404' Rev 06/15/88 Date I/;;)-~/I?I SUBMIT IN DUPLICATE BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907") 561-5111 TO: DISTRIBUTION Date :09/10/90 T#:81645 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FIN.ALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-dd'!5. A-18 Prod-F Jewelry 08/15/90 #1 2150-10030 Camco 5" B-13 PITS 08/24/90 #1 10300-10839 Camco 5" D-18 Prod- F 08/19/90 #1 10850-11250 Camco 5" F-26 Gas Entry 08/14/90 #1 10180-10535 Camco 5" H-08 Gas E.qtry 08/15/90 #1 8950-9420 Camco 5" M-21 Prod-F 08/22/90 #1 '8850-9250 Camco 5" M-29 Inj 08/16/90 #1 9550-10025 Camco 5" X-24 Inj 08/28/90 #1 9050-9450 Camco 5" Y-27 Prod- F 08/23/90 #1 13000-13250 Camco 5" DiStribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERV__~_.QjJ3___~ ~OF ALASK;, RECEIVED S E P 1 ? 1990 Alaska 0il & Gas Cons. {.;0remission Anchorage STATE OF ALASKA AL..~KA OIL AND GAS CONSERVATION COMMI$,.,,,.)N APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend __ Operation Shutdown __ Re-enter suspended well__ Alter casing __ Repair well__ Plugging __ Time extension __ Stimulate X. Change approved program ~ Pull tubing ~ Variance __ Perforate__ Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1448' SNL, 384' WEL, SEC. 33, T11N, R13E 5. Type of Well: Development x Exploratory __ Stratigraphic__ Service At top of productive interval 9. Datum elevation (DF or KB) 80.26 feet Unit or Property name Prudhoe Bay Unit Well number Y-27 (31-05-10-13) Permit number 840' SNL, 2554' WEL, SEC. 05, TION, R13E At effective depth 908' SNL, 2774' WEL, SEC. 05, TION, R13E At total depth 917' SNL, 2801' WEL, SEC. 05, TION, R13E 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 13450 feet Plugs (measured) 9223 feet 13411 feet Junk (measured) 9196 feet 10. 11. 90-28 APl number 50- O29-22O 19 Field/Pool Prudhoe Oil Pool Casing Length Size Cemented Structural -- Conductor 20" Surface 17-1/2" 13-3/8" 4423 cuft Intermediate 12-1/4" 9-5/8" 2781 cuft Production -- Liner 8-1/2" 7" 245 sx Measured depth 110" 2853" 12935" 13450" True vertical depth BKB 110' 2853" 12935" 1345O" Perforation depth: measured 13105'-13130', 13130'-13155', 131555-13180' true vertical subsea8904'-8956' (three intervals) Tubing (size, grade, and measured depth) 4-1/2" 12.6~, 12678'MD Packers and SSSV (type and measured depth) Otis 3.813"1D, 2294 RECEIVED S E P - ,5 1990 Alaska 0il & Gas Cons. Anctt0rag 13. Attachments Description summary of proposal. X Detailed operations program BOP sketch X 14. Estimated date for commencing operation August 1990 16. If proposal was verbally approved Oil X Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,Signed '~ 15. Status of well classification as: Gas Title j>~ ~OF=/£O~ ~r.~v- FOR COMMISSION USE ONLY-- Suspended__ Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- Date lAppr°val No- <~Z) -?~? / - Approved by order of the Commission Form 10-403 ReV 06/15/88 ORIGINAL SIGNED LONNIE _P, Commissioner Dat I q-/qO SUBMIT IN TRIPLICATE WELL Y-27 ¢31-05-10-13) PEIU IVISHAK FRAC PROPOSAL · 1 . Rig up hydraulic fracturing equipment and pressure test. Perform perforation wash treatment. Pump fmc job as given below: STAGE PAD 1 2 3 4 5 6 FLUSH TOTALS VOLUME PROPPANT MLBS PER RATE .MGALS PPG STAGE BPM 28.0 0.0 0.0 30 2.0 1.0 16/20 CL 2.0 30 1.0 3.0 16/20 CL 3.0 30 1.0 5.0 16/20 CL 5.0 30 1.0 7.0 16/20 CL 7.0 30 1.0 8.0 16/20 CL 8.0 30 5.0 10.0 16/20 CL 50 30 8.5 0 0 30 47.5 75 CL . . Leave well shut in overnight. Clean out any fmc sand. Put well on production at minimum rate, then test. mr:8/31/90 r'- BOP STACK I 1 KILL LINE CONNECTION INJECTOR HEAD PACK OFF' QUICK UNION "1 I BLIND SHEARS WHP SENSOR BLIND SHEARS PIPE SLIPS ,~LANGE:D CONNECTION TYPICAL CTU STACK SWAB VALVE Alaska Oil & G~S Cons. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Bouievarcl P.O. Box 196612 Ancl3orage, AlasKa 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :07/31/90 T#:81450 FROM: Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. ~,,,'1~!-07 Peal 07/02/90 #1 9500-9850 HLS 5" ~ S-18 Perf 07/09/90 #1 11150-11965 HLS 5" v.S-18 Perf 07/10/90 #1 11600-11820 HLS 5" v" S-21 Per/ 06/30/90 #1 9600-10358 HLS 5;' v~' W-29 Tubing Jewerly 07/16/90 #1 10400-10820 HLS 5" ~ Y-27 Perf 06/29/90 #1 13000-13415 HLS 5" V~ Z-08 Perf 06/27/90 #1 10585-11576 HLS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERV~R ~. ~;~ALASKA-~~ ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO CHEVRON EXXON MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES ARCHIVES DATE: 04/05/90 T#: 81041 Enclosed is your questions, please JY-27 BHCA ~ Y-27 CN/GR /Y-27 CORGUN /Y-27 DIFL BP OPEN HOLE FINAL L~ / copy of the material listed below. %f~you have any contact BP Well Recordstat (907) 564-4445. · ~ 10250-.13390 Atlas 03/~9a ~31 !311!~.~3285 ~tlas' 03~9~ 8 12930~i3448 Atlas 2"/5" 2"/5" 2"/5" GEOS/ARCO/EXXON/ARCHIVES ONLY. /Y-27 SS TVD 03/18/90 #1 Atlas 1"/2" Z-27 SS TVD 04/01/90 #1 Atlas 1"/2" / STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Survey Date: Job#: Job#: Information Control Well Records LR 2-1 J. Dietz/S. McCurry ' ' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION ELL COMPLETION OR RECOMPLETION 1 · Status of Well Classification of Service Well OIL [] GAS r'l SUSPENDED [] ABANDONED [] SERVICE [] '~. Name of Operator 7. Permit Number BP Exploration 90-28 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 . 50- 029-22019 4. Location of well at surface ~~ 9. Unit or Lease Name 1448' SNL, 384' WEL, SEC. 33, T11N, R13E Prudhoe Bay Unit At Top Producing Interval 10. Well Number Y-27 (31-05-10-13) 2554' SEC. , 840' SNL, WEL, 05, TION, R13E i ~J~tFIED  11. Field and Pool At Total Depth i ~ Prudhoe Bay Field/Prudhoe Bay Pool 917' SNL, 2801' WEL, SEC. 05, TION, R 13E 5. Elevation in feet (indicate KB, DF, etc.) J6. Lease Designation and Serial No. KBE = 80.26' I ADL 28289 12. 'Da{e SpUdded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore J16. No. of Completions 02-26-90 03-18-90 06-29-90I N/A feet MSL I ONE 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey J20. Depth where SSSV set 121. Thickness of Permafrost 13450'MD/9223'TVD 13411'MD/9196'TVD YES [] NO []I 2294'feet MD I 1986' 22. Type Electric or Other Logs Run DIL/GR/BHCS/CNL/SP, RFT, SWC 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Cond. Surface 11 O' 13-3/8" 68# L-80 Surface 2853' 17-1/2" 4423 cuft Arcticset il & III 9-5/8" 47# L-80 Surface 12935' 12-1/4" 2781 cufl Class G 7" 26# L-80 12660' 13450' 8-1/2" 245 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and .)5. TUBING RECORD interval, size and number) SIZE DEPTH SET {MD) PACKER SET {MD) Halliburton 3-3/8"@ 6 spf 4-1/2" 12.6# 12678' 12630' MD TVDss 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 13106'-13131' 8904'-8922' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 13131'-13156' 8922'-8939' 13-3/8" X 9-5/8" Freeze Protect Annulus with 135 bbls 13156'- 13181' 8939'-8956' Dry Crude 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 06-29-90 I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF iNATER-BBL CHOKE SIZE JGAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF ~ATER-BBL OIL GRAVITY-APl (corr) IPress. 24-HOUR RATE 28. CORE DATA 'Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water· Submit co~e c~iDs Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS ',MATION TESTS = -- · NAME = ' = Include interval tested, pressure data, all fluids recovered and gravity, ?. ~' ' ' '; MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 12939' 8872 Shublik A 12966 8890' Zone 4 13094" 8977' · · 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct lo the best of my knowledge Signed /f~'/~' Title PBU Lead En_oineer Date · INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday, February 27, 1990 WELL: Y-27 (31-05-10-13) RIG: NABORS 18-E Day: 1 Depth at 0600 Hrs. = 0 24 Hour Footage = 0 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation: Mixing spud mud. Summary of Last 24 Hours: Completed rig move and accepted rig for Y-27 at 1200 hrs. Start mixing spud mud. Wells Shut-in For Drill-By: Y-12, Y-19 & Y-20 MudType MUd Weight Viscosity P V YP, Fluid Loss Solids TemD fi/gal Sec. cc °F · Survey Depth Anole Directiort TVD N-$ E-W, DQg Leg Section Coordinate (~oordinate ~ Alasi~a Oil & Gas 6o~'~s. Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, February 28, 1990 WELL: Y-27 (31-05-10-13) RIG: NABORS 18-E Day: 2 Depth at 0600 Hrs. = 880 24 Hour Footage = 464 AP! No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation: Drilling 17-1/2" holel Summary of Last 24 Hours: Drilled and surveyed to 843'. P©H and stuck at 752'. Worked pipe free and came out of hole for changing BHA. RIH with Dynadrill. Wells Shut-in For Drill-By: Y-12, Y-19 & Y-20 Mud Type . Mud Weight Spud Mud 9.2 fi/gal Survey Depth Anale Direction ViScosity 185 Sec. TVD P V YP Fluid Loss Solids Tem~ 27 56 12.0 cc 7% 48 °F , ,, N-S E-W Dog Leg Sectiorl Coordirtate Coordinate °/100! Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Thursday, March 1, 1990 WELL: Y-27 (31-05-10-13) BAY UNIT RIG: NABORS 18-E Day: 3 Depth at 0600 Hrs. = 1,425 24 Hour Footage = 545 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' Drilling 17-1/2" hole. Summary of Last 24 Hours: Drilled and surveyed to 1425' with Dynadrill. Wells Shut-in For Drill-By: Y-12, Y-19 & Y-20 Mud Type Mud Weight Viscosity p V yp. Spud Mud 9.2 fi/gal 145 Sec. 21 47 Fluid Loss Solids Temp 12.0 cc 6.5% 52 °F Survey Depth Angle Direction TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, March 2, 1990 WELL: Y-27 (31-05-10-13) PRUDHOE BAY UNIT RIG: NABORS 18-E Day' 4 Depth at 0600 Hrs. = 2,250 24 Hour Footage = 825 AP! No. AFE Number: AFE Amount = Current Field Costs = 50-029-22019 125159 Current Operation: Drilling 17-1/2" hole. Summary of Last 24 Hours: Drilled and surveyed to 2250' with Dynadrill. Wells Shut-in For Drill-By: Y-12, Y-19 & Y-20 Mud Type Mud Weight Viscosity ...P. VYP Spud Mud .. '- '-9.3 #/gal 1 60 Sec. 22 46 Fluid Loss Solids Temp 12.4 cc 7.5% 56 °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinote Coordinate °/1 Reviewed By' ~,~4, BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Monday, March 5, 1990 WELL: Y-27 (31-05-10-13) BAY UNIT RIG: NABORS 18-E Day: 7 Depth at 0600 Hrs. = 4,521 72 Hour Footage = 2,271 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation: POOH. Summary of Last 72 Hours: Drilled 17-1/2" hole to 2865'. Ran and cemented 13-3/8", pumped top job. N/U and tested BOP's. Tested 13-3/8" casing, drilled out shoe and performed L.O.T. Drilled 12-1/4" hole to 4521'. POOH for washout. Wells Shut-in For Drill-By: Y-12, Y-19 & Y-20 Mud Type Mud Weight Viscosity Low Solids 9.3 Cf/gal 34 Sec. PV YP Fluid Loss Solids 4 7 13.0 cc 7% Temp 64 OF Survey Depth Angle Direction TVD 30 3,294 53.20 S52.1W 2,970 34 4,454 50.30 S52.4W 3,680 N-,.S E-W Section Coordinate Coordinate. 1,079 S633.40 W878.01 1,966 Sl178.86 W1584.04 Dog Leg o/100, 0.17 0.18 Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday, March 6, 1990 WELL' Y-27 (31-05-10-13) RIG-' NABORS 18-E Day: 8 Depth at 0600 Hrs. = 5,750 24 Hour Footage = 1,229 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation: Drilling 12-1/4" hole. Summary of Last 24 Hours: Changed bit and B.H.A. Drilled and surveyed to 5750'. Wells Shut-in For Drill-By: Y-12, Y-19 & Y-20 MudType Mud Weight Viscosity P V YP Fluid Loss Solids Temp Low Solids 9.2 Cf/gal 37 Sec. 6 9 9.0 cc 6.5% 60 °F Survey Depth Angle Direction TVD N-S E-W Dog Leg Section Coordinate. Coordinate °/1001 Reviewed By' ~.~. BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, March 7, 1990 WELL: Y-27 (31-05-10-13) RIG: NABORS 18-E Day: 9 Depth at 0600 Hrs. = 6,710 24 Hour Footage = 960 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' Drilling 12-1/4" hole. Summary of Last 24 Hours' P.O.H. for changing B.H.A.R.I.H. Drilled and surveyed to 6710'. Wells Shut-in For Drill-By: Y-12, Y-19 & Y-20 Mud Type Mud Weight Viscosity P .V. Low Solids 9.4 ./C/gal 38 Sec. 9 YP Fluid Loss Solids Temp 9 8.6 cc 8.5% °F Survey Depth Angle Direction TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: '~.H. BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, March 8, 1990 WELL: Y-27 (31-05-10-13) RIG: NABORS 18-E Day: 10 Depth at 0600 Hrs. = 7,620 24 Hour Footage = 910 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' Drilling 12-1/4" hole. Summary of Last 24 Hours: P.O.H. for changing B.H.A.R.I.H. benchmark @ 4800' with Teleco MWD. Drilled and surveyed to 7620'. Wells Shut-in For Drill-By: Y-12 & Y-20 MudType Mud Weight Viscosity P V YP. Fluicl Loss Solids Low Solids 9.0 Cf/gal 42 Sec. 10 9 33.0 cc 8.5% Temp 78 OF Survey Depth Angle Directi0n TVD N-S E-W Section Coordinate .Coordinate ,DQg. Leg °/100' Reviewed By' ~.~, BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, March 9, 1990 WELL: Y-27 (31-05-10-13) PRUDHOE BAY UNIT~ RIG: NABORS 18-E Day: 1 1 Depth at 0600 Hrs. = 8,460 24 Hour Footage = 840 AP! No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' Drilling 12-1/4" hole. Summary of Last 24 Hours' P.O.H. for changing B.H.A. RIH and benchmark @ 4800'. surveyed to 8460'. Drilled and Wells Shut-in For Drill-By' Y-12 & Y-20 .Mud. Type Mud Weight Viscosity, .P V YP Fluid Loss Solids Temp Low Solids 9.5 CC/gal 37 Sec. 1 1 7 8.6 cc 9% 83 °F Survey Depth Angle Direction TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By' },/-/, BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Monday, March 12, 1990 WELL: Y-27 (31-05-10-13) BAY UNIT RIG: NABORS 18-E Day: 1 4 Depth at 0600 Hrs. = 10,652 72 Hour Footage = 2,192 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' RIH with 12-1/4" bit and B.H.A. Summary of Last 72 Hours' P.O.H. for changing B.H.A. Tested BOP to 5000 psi, ok. Checked Teleco's survey tool, ok. RIH to 10,652'. Wells Shut-in For Drill-By' Y-12 & Y-20 MudType Mud Weight Viscosity p v .yP. Fluid Loss Solids Tem.o Low Solids 9.6 Cf/gal 41 Sec. 12 10 7.8 cc 9.5% 82 °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100, Reviewed By: .~ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Tuesday, March 13, 1990 WELL: Y-27 (31-05-10-13) BAY UNIT RIG' NABORS 18-E Day' 1 5 Depth at 0600 Hrs. = 11,031 24 Hour Footage = 379 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation: R.I.H. with 12-1/4" B.H.A. Summary of Last 24 Hours: Drilled and surveyed intermediate hole to 11,031'. Wells Shut-in For Drill-By: Y-12 & Y-20 MudType Mud Weight Viscosity P V .YP. Fluid Loss Solids Temp Low Solids 9.7 fi/gal 39 Sec. 1 0 9 7.8 cc 1 0% °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: -/)././. BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, March 14, 1990 WELL: Y-27 (31-05-10-13) RIG: NABORS 18-E Day: 1 6 Depth at 0600 Hrs. = 11,656 24'Hour Footage = 625 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' RIH with 12-1/4" B.H.A. Summary of Last 24 Hours: Drilled and surveyed to 11,656'. Wells Shut-in For Drill-By' Y-12 & Y-20 P.O.H. for changing B.H.A. Mud Type Mud Weight Viscosity .R V Low Solids 9.8 #/gal 40 Sec. 11 YP Fluid Loss Solids Temp 8 6.0 cc 10.5% 83 °F Survey Depth_ Angle Direction TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Thursday, March 15, 1990 WELL: Y-27 (31-05-10-13) BAY UNIT RIG: NABORS 18-E Day:' 1 7 Depth at 0600 Hrs. = 12,475 24 Hour Footage = 819 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' P.O.H. for changing B.H.A. Summary of Last 24 Hours: Drilled and surveyed 12-1/4" hole to 12,475'. Wells Shut-in For Drill-By: Y-12 & Y-20 .Mud Type Mud Weight Viscosity Lightly Dispersed 9.9 Cf/gal 36 Sec. P V ..YP. Fluid Loss Solids Temp 1 5 8 6.0 cc 11% 84 °F Survey Depth Angle DirectiQn N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By' 'z,.~, BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Friday, March 16, 1990 WELL: Y-27 (31-05-10-13) BAY UNIT RIG: NABORS 18-E Day' 1 8 Depth at 0600 Hrs. = 12,945 24 Hour Footage = 470 AP! No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' P.O.H. to run 9-5/8" casing. Summary of Last 24 Hours' Drilled and surveyed 12-1/4" hole to 12,945'. C.B.U. and P.O.H. Wells Shut-in For Drill-By' Z-28 MudType Mud Weight Viscosity , .P V Lightly Dispersed 10 Cf/gal 36 Sec. 9 .YP Fluid Loss Solids Temp 7 6.0 cc 11.5% 85 °F Survey Depth Angle Direction TVD N-S E-W Dog Leg Section Coordinate Coordinate 0/100, Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Monday, March 19, 1990 WELL: Y-27 (31-05-10-13) BAY UNIT RIG: NABORS 18-E Day: 21 Depth at 0600 Hrs. = 13,450 72 Hour Footage = 505 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation: Logging · Summary of Last 72 Hours: Ran 9-5/8" casing and cemented. Drilled 8-1/2" hole to 13,450'. Wells Shut-in For Drill-By: Y-12 & Y-20 Mud Type Mud Weight Low solids 8.9 Cf/gal Viscosity P V YP Fluid Loss' Solids Temp 36 Sec. ' 10 8 9.0 cc 4% 78 °F Survey, Depth Angle Direction N-S E-W Dog Leg TVD. S'ection Coordinate Coordinate °/100, Reviewed By: ¢-~ BP 'EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT 'As of 0600 Hrs. Tuesday, March 20;1990 WELL: Y-27 (31-05-10-13) RIG: NABORS 18-E Day: 22 Depth at 0600 Hrs. = 13,450 24 Hour Footage = 0 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current' Field Costs = Current Operation: -Logging. Summary of Last 24 Hours: Attempted 3 RFT's (All failed). Ran sidewall coves. Wells Shut-in For Drill-By: Y-12 & Y-20 Mud.. Type Mud Weight ' Viscosity P V YP. Flui¢ Loss Solids Temp Iow solids 8.9 Cf/gal 39 Sec." 1.0 9 9.0 cc 4% . '°F Survey Depth Angle Direction N-S E-W Dog Leg TVD ' Section Coordinate C'oordinate °/100' Reviewed By: ~ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Wednesday, March 21, 1990 WELL: Y-27 (31-05-10-13) BAY UNIT RIG: NABORS 18-E Day: 23 Depth at 0600 Hrs. = 13,450 24 Hour Footage = 0 AP! No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' Ce.menting liner. Summary of Last 24 Hours: Logged and obtained sidewall cores. Circulated and ran 7" liner. Wells Shut-in For Drill-By: Y-12 & Y-20 MudType Mud Weight .Viscosity .P V YR Fluid Loss Solids Temp low solids 9.1 Cf/gal 41 Sec. 10 8 8.8 cc 4.5% °F Survey Depth Angle Direction TVD N-S E-W Dog Leg Section Coordinate .(;;oordinate °/100' Reviewed By: ~ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, March 22, 1990 WELL: Y-27 (31-05-10-13) RIG: NABORS 18-E Day: 24 Depth at 0600 Hrs. = 13,450 24 Hour Footage = 0 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' RIH to clean out liner. Summary of Last 24 Hours: Cemented liner. POOH with R/T. RIH and cleaned out to liner top. Wells Shut-in For Drill-By' Y-12 & Y-20 Mud. Type Mud Weight Viscosity P V Low Solids 9.2 Cf/gal 43 Sec. 1 1 YP Fluid Loss Solids Temp 8 8.4 cc 4.5% °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section, Coordinate Coordinate ?/100' Reviewed By' ~'.~. BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Friday, March 23, 1990 WELL: Y-27 (31-05-10-13) RIG: NABORS 18-E Day' 25 Depth at 0600 Hrs. = 13,411 24 Hour Footage = 0 APl No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation' Circulating. Summary of Last 24 Hours' Cleaned out liner to 13,411'. Tested liner lap to 3000 psi. RIH with 7" scraper. Tested liner lap and 9-5/8" casing to 3000 psi. Circ. and inject down 13-3/8" x 9-5/8" annulus. Wells Shut-in For Drill-By: Y-12 & Y-20 MudType Mud Weiqht Viscosity. P ¥ .YP Fluid Loss Solids Temp Low solids 8.9 CC/gal 40 Sec. 9 4 cc 4% °F Survey Depth Angle Direction TVD N-$ E-W Section Coordinate Coordinate Dog Leg o/100' Reviewed By' BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, March 26, 1990 WELL: Y-27 (31-05-10-13) RIG: NABORS 18-E Day: 28 Depth at 0600 Hrs. = 72 Hour Footage = 0 AP! No. 50-029-22019 AFE Number: 125159 AFE Amount = Current Field Costs = Current Operation: Released rig 1200.hrs. 3~25/90. Rig moving to CC-2A. Summary of Last 72 Hours' Displaced well to brine. Tested liner to 3000 psi. Ran and landed tubing. N/D BOP's. N/U and tested tree. Freeze protected tubing. Set and tested packer. Tested annulus to 2500 psi 30 mins. Released rig. Wells Shut-in For Drill-By: Y-12 & Y-20 Mud Type Mud Weight Viscosity Cf/gal PV YP Fluid Loss Solids Temp Sec. cc °F Survey Depth Angle Direction N-$ E-W. Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: II I I ORIGINAL II SUB. SURFACE DIRECTIONAL SURVEY ~---]UIDANCE ~'~ONTINUOUS r-~lOOL Company BP EXPLORAT.I. ON , Well Name Y-27 (31-05-10-13)(1..448' SNL,387' WEL,SEC 33,TllN.R13E) Field/Location PRUDHOE BAY, NORTH SLOPE, ALASKA [ V - ,,,,~ .... Job Reference No. ~ E C i~ ~.~~''' Date 73797 6-APR-90 Logged By: AUG 0 ~; '~. [! !':ii il) Computed By; M C B R I D E Alaska Oil & Gas Co,'ts. O~i~[flt~ K 0 H R I N G GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION Y-27 C 31-05-10-13) PRUDHOE BAY NORTH SLOPE· ALASKA SURVEY DATE: 06-APR-90 ENGINEER: NCBRIDE METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZINUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 58 DEG 12 HIN WEST BP EXPLORATION Y-27 (31-05-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATTON DATE: 18-APR-90 TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH OEO MIN DEG NZN 0.00 0.00 -80.26 0 0 N 0 0 E 100.00 100.00 19.74 0 7 S 11 25 E 200.00 200.00 119.74 0 11 N 38 28 E 300.00 300.00 219.74 0 8 S 26 14 W 400.00 400.00 319.74 0 16 S 17 57 E 500.00 499'99 419.73 I 45 S 57 42 W 600.00 599.82 519.56 4 31 S 64 56 bi 700.00 699.34 619.08 6 28 S 61 47 bi 800.00 798.44 718.18 9 0 S 65 7 W 900.00 896.94 816.68 10 52 S 63 44 W PAGE ' I DATE OF SURVEY: 06-AP:R-g0 KELLY BUSHING ELEVATION: 80.26 FT ENGINEER: NCBRID~ INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH VERTICAL OOGLEG RECTANGULAR COOROINATES HORIZ. OEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/blEST DIST. AZIMUTH FEET OEO/lO0 FEET FEET FEET DEG MIN 0.00 0.00 0.00 N 0.00 E 0.08 0.02 0.14 S 0.00 bi -0.11 0.41 0.17 S 0.23 E -0.14 0.31 0.08 S 0.22 E 0.01 0.48 0.48 S 0.29 E 1.10 2.63 1.25 S 0.52 bi 6.65 1.90 3-79 S 5.47 ~ 16.34 1.60 8.23 S 14.13 W 29.62 2.31 14.20 S 26.04 W 46.73 1.67 21.52 S 41.64 W S 62 14 W 66.40 0.26 S 61 56 bi 86.91 1.15 S 61 4 W 109.07 1.22 S 60 33 W 133.52 1.05 S 59 3 W 159.74 0.77 S 56 26 W 186.32 0.48 S 55 19 W 212.90 0.49 S 53 36 W 239.20 0.53 S 52 11 W 266.14 1.85 S 51 58 W 295.42 1.71  51 40 W ~27.17 52 17 W 360.79 S 54 15 W 397.13 S 53 27 W 436.42 S 51 45' W 477.59 S 51 49 W 522.68 S 52 11 W 574.29 S 52 17 bi 633.69 S 52 43 bi 698.89 S 51 47 bi 769.36 S 51 30 W 6¢4.70 S 51 41 W 922.74 S 51 45 W 1002.27 S 51 49 W 1081.88 S 51 49 W 1160.94 S 51 50 bi 1239.67 S 51 49 W 1318.17 S 51 50 bi 1396.51 S 51 51 W 1474.44 S 51 48 bi 1552.18 1000.00 994.97 914.71 11 41 1100.00 1092.83 1012.57 12 9 1200.00 1190.34 1110.08 13 31 1300.00 1287.29 1207.03 14 49 1400.00 1383.79 1303.53 15 27 1500.00 1480.19 11399.93 15 24 1600.00 1576.59 1496.33 15 25 1700.00 1673.05 1592.79 15 15 1800.00 1769.32 1689.06 16 20 1900.00 1864.88 1784062 17 55 2000.00 1959.64 1879.38 19 14 2100.00 2053.74 1973.48 20 26 Z200.O0 2146.84 2066.58 22 27 2300.00 2238.76 2158.50 23 47 2400.00 2329.79 2249.53 25 17 2500.00 2418.87 2338.61 29 3 2600.00 2504.31 2424005 33 43 2700000 2584.44 2504.18 39 16 2800.00 2659.96 2579.70 42 42 2900.00 2730.48 2650.22 47 44 3000.00 2795.63 2715.37 50 41 3100.00 2857.49 2777.23 52 44 3200.00 Z917.4Z 2837.16 53 24 3300.00 2977.28 2897.02 52 55 3400.00 3037.87 2957.61 52 34 3500.00 3098.89 3018.63 52 17 3600°00 3160.22 3079.96 52 7 3700.00 3221.76 3141050 51 50 3800.00 3283.81 3203.55 51 33 3900.00 3346.10 3265.84 51 21 0.90 1.25 2.40 1.68 2.54 4.36 6.08 3.83 4.20 4.33 2.57 1.48 0.11 0.91 0.26 0.07 0.08 0.62 0.25 0 30.58 S 59.18 40.18 S 77.35 0.00 N 0 0 E 0.14 S 2 2 W 0.29 S 54 9 E 0.23 S 69 58 E 0.56 S 30 56 E 1.35 S 22 35 bi 6.66 'S 55 19 W 16.35 S 59 47 W 29.66 S 61 24 W 46.87 S 62 40 W 50.80 S 96.84 W 109.35 S 62 19 W 62.73 S 118.20 W 133.82 S 62 3 W 75.91 S 140.89 W 160.04 S 61 41 W 90.14 S 163.34 W 186.56 S 61 7 W 105008 S 185.36 W 213.07 S 60 27 W 120.39 S 206.80 W 239.29 S 59 48 W 136.76 S 228.35 W 266.18 S 59 5 W 154.87 S 251.57 W 295.42 S 58 23 M 174.63 S 276.68 W 327.18 S 57 45 W 195.51 S 303.29 W 360.85 S 57 12 M 217.34 S 332.52 W 397.25 S 56 50 W 240.37 S 364.46 W 436.59 S 56 36 W 265.60 S 397.26 W 677.87 S 56 14 W 293.79 S 432.84 W 523.13 S 55 50 W 325.65 S 473.81 W 574.93 S 55 30 W 362.30 S 520.97 W 634.57 S 55 11 bi 402.14 S 572.99 W 700.02 S 54 56 W 445.49 S 629.03 W 770.80 S 54 42 W 492.62 S 688.45 W 846.54 S 54 25 W 541.45 S 750.00 W 925.02 S 54 10 W 591.05 S 812.83 W 1005.00 S 53 59 W 640.61 S 875.76 W 1085.06 S 53 49 W 689.76 S 938.31 W 1164.56 S 53 41 W 738.76 S 1000.57 bi 1243.74 S 53 34 W 787.58 S 1062.66 bi 1322.70 S 53 27 bi 836.28 S 1124.64 W 1401.49 S 53 22 W 884075 S 1186.28 W 1479.88 S 53 17 bi 933.12 S 1247.77 bi 1558.09 S 53 13 bi 66.61 S 62 40 W 87.16 S 62 33 W COHPUTATION DATE: 18-APR-90 PAGE BP EXPLORATION Y-27 (31-05-10-13) PRUDHOE BAY NORTH SLOPE,~ ALASKA DATE OF SURVEY: 06-APR-90 KELLY BUSHING ELEVATION: 80.26 FT ENGINEER: NCBRID~ INTERPOLATED VALUES FOR EVEN 100 FEET OF HEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MZN DEG MIN 4000.00 3408.92 3328.66 50 59 4100.00 3471.67 3391.41 51' 2 4200.00 3534.81 3454.55 50 39 4300.00 3598.48 3518.22 SO 18 4400.00 3662.45 3562.19 50 10 4500.00 3726.65 3646.39 49 57 4600.00 3790.51 3710.25 50 48 4700.00 3852.68 3772.42 52'25 4800.00 3912.31 3832.05 54 22 4900.00 3969.70 3889.44 55 28 5000.00' 4026.50 3946.24 55 16 5100.00 4083.48 4003.22 55 6 5200.00 4141.33 4061.07 54 20 5300.00 4199.53 4119.27 54 25 5400.00 4258.03 4177.77 54 5 5500.00 4316.58 4236.32 54 14 5600.00 4375.31 4295005 54 0 5700.00 4433.69 4353.43 54 39 5800.00 4490088 4410.62 55 28 5900.00 4547.66 4467.40 55 27 6000.00 4603.96 4523070 56 0 6100.00 4659.26 6579000 56 56 6200.00' 4713.16 4632.90 57 47 6300.00 4766004 4685.78 58 13 6400.00 4818.69 4738.43 58 12 6500.00 4871.69 4791.43 57 51 6600.00 4925.00 4644074 57 40 6700.00 4978.92 4898.66 57 6 6800.00 5033-67 4953.41 56 24 6900.00 5089.21 5008.95 56 10 7000.00 5145.16 5064.90 55 48 7100.00 5201.53 5121.27 55 31 7200.00 5258.39 5178.13 55 11 7300.00 5315.77 5235.51 54 47 7400.00 5374.08 5293.82 53 59 7500.00 5432.97 5352071 53 45 7600000 5492-28 5412.02 53 32 7700.00 5551.50 5471.24 53 35 7800000 5611.39 5531.13 53 0 7900.00 5671.87 5591.61 52 35 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/gEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET OEG S 51 52 g 1629.51 S 51 55 bi 1706.89 S 51 59 g 1783.97 S 52 I bi 1860.63 S 52 2 M 1937.05 S 51 51 bi 2013.26 S 51 48 bi 2089.74 S 51 46 bi 2167.57 S 51 39 g 2247.32 S 51 40 ~ 2328.68 S 51 55 W 2410.47 S 52 7 bi 2492.16 S 53 I bi 2573.34 S 53 29 bi 2654.34 S 54 4 W 2735.21 S 54 3 bi 2816.07 S 54 0 ~ 2896.79 S 54 44 bi 2977.80 S 55 25 W 3059.70 S 55 46 bi 3141.93 S 55 50 W 3224.50 S 56 0 bi 3307.75 S 56 24 g 3391.93 S 57 0 g 3476.77 S 56 5 bi 3561.78 S 59 17 ~ 3646.58 S 60 Z ~ 3731.15 S 60 31 bi 3815.32 S 60 I W 3898.94 S 59 48 bi 3982.06 S 59 47 bi 4064.92 S 59 59 g 4147.48 S 60 3 ~ 4229.69 S 59 57 M 4311.56 S 59 46 W 4392.76 S 59 23 M 4473.56 S 59 10 bi 4554.06 S 59 3 bi 4634.63 S 58 52 W 4714.70 S 59 3 bi 4794.33 0.82 0.47 0.51 0.21 0.16 0.06 1.19 1.95 1.66 0.65 981.20 S 1308.94 W 1635.87 S 53 9 bi 1029.28 S 1370.18 g 1713.71 S 53 5 bi 1077.09 S 1431.23 ~ 1791.24 S 53 2 M 1124.57 S 1491.99 W 1868.34 S 53 0 g 1171.87 S 1552.57 ~ 1945.19 S 52 57 ~ 1219.12 S 1612.96 W 2021.85 S 52 55 M 1266.70 S 1673.44 ~ 2098.79 S 52 53 ~ ) 1315.15 S 1734.97 W 2177.10 S 52 50 W · 1364.90 S 1797.96 ~ 2257.35 S 52 48 ~ 1415.71 S 1862.19 bi 2339.23 S 52 45 W 0.35 1.07 0.45 1.22 0.19 0.04 0.69 lo20 0.52 0.98 1466.61 S 1926.87 ~ 2421.52 S 52 43 1517.26 S 1991.58 ~ 2503.69 S 52 42 1566.76 S Z056.41 ~ 2585.26 S 52 42 1615.49 S 2121.51 ~ 2666.57 S 52 43 1663.35 S 2186.98 ~ 2747.66 $ 52 45 1710.93 S 2252.62 ~ 2828.71 S 52 47 1758.48 S 2318.12 g 2909.63 S 52 49 1805.82 S 2384.08 M 2990.79 S 52 51 1852.77 S 2451.33 bi 3072.75 S 52 55 1899.26 S 2519.27 N 3154.98 S 52 59 0.69 1.16 0.99 0.75 1.15 0.82 0.71 0.27 0.72 0.32 1945.74 S 2587.60 bi 3237.53 S 53 4 W 1992.43 S 2656.61 ~ 3320.75 S 53 8 g 2039.37 S 2726.55 ~ 3404.86 S 53 12 ~ 2085.98 S 2797.48 M 3489.58 S 53 17 bi 2131.63 S 2869. Z0 W 3574.37 S 53 23 ~ 2175.68 S 2941.66 bi 3658.81 S 53 31M 2218o39 S 3014.69 ~ 3742.94 S 53 39 g 2260.10 S 3087.85 ~ 3826.60 S 53 48 bi ~ 2301.55 S 3160.54 ~ 3909.75 S 53 56 M / 2343.30 S 3232.46 W 3992.47 S 54 4 ~ 0.36 0.88 0.39 0.70 0.39 '0.80 0.52 1.42 0.60 0.61 2385.05 S 3304.06 kl 4074.96 S 54 11 2426.50 S 3375.51 W 4157.16 S 54 17 2467.58 S 3446.77 bi 6239.01 S 54 24 bi 2508.56 S 3517.69 bi 4320.53 S 54 30 2549.33 S 3587.95 bi 4401.42 S 54 36 kl 2590.23 S 3657.66 I~ 4481.94 S 54 42 2631.49 S 3726.80 bi 4562.21 S 54 46 bi 2672.82 S 3795.97 bi 4642.56 S 54 51 bi 2714018 S 3864.55 M 4722.45 S 54 55 W 2755.29 S 3932.75 la 4801.89 S 54 59 W BP EXPLORATION Y-27 (31-05-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 18-APR-90 PAGE · DATE OF SURVEY: 06-APR-90 KELLY BUSHING ELEVATION: 80026 FT ENGINEER: MCBRID~ INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE mEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG #IN 8000.00 5732.79 5652o53 52 35 8100.00 5793026 5713.00 53 3 8200.00 5853.15 5772.89 53 9 8300.00 5913031 5833.05 52 57 8400.00 5973068 5893.42 52 47 8500.00 6034.39 5954.13 52 29 8600000 6095043 6015.17 52 19 8700.00 6156.64 6076.38 52 10 8800.00 6218012 6137.86 51 58 8900.00 6279085 619905.9 51 41 9000.00 6342029 6262003 51 1 9100000 6405.72 6325046 50 16 9200.00 6469.90 6389064 49 55 9300.00 6534050 6454024 49 36 9400.00 6599.51 6519.25 49 16 9500.00 6664091 6584.65 49 6 9600000 6730.44 6650018 49 0 9700000 6796.21 6715095 48 43 9800.00. 6862.50 6782.24 48 21 9900.00 6928.88 6848062 48 30 10000.00. 6994094 6914.68 48 41 10100.00 7061.13 6980087 48 23 10200.00 7127.61 7047035 48 13 10300.00 7194.41 7114.15 48 3 10400.00 7261o25 7180.99 47 55 10500.00 7328.55 7248.29 47 31 10600000 7396.10 7315.84 47 29 10700.00 7463070 7383.44 47 31 10800000 7530086 7450.60 48 11 10900.00 7596.64 7516.38 49 44 11000.00 7659077 7579051 51 53 m11100.00 7720o69 7640.43 52 44 11200.00 7781010 7700.84 53 1 11300000 7841.19 7760.93 53 6 11400.00 7901.17 7820.91 53 14 11500000 7960099 7880073 53 19 11600.00 8020.66 7940o40 53 20 11700.00 8080.16 7999090 53 44 11800.00 8139'31 8059.05 53 34 11900.00 8199.23 8118o97 ~.~.~2 54 ""EJVE: DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZo DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/IdEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG MIN S 59 25 bi 4873062 S 59 31 Id 4953.24 S 59 25, Id 5033.30 S 59 27 Id 5113.17 S 59 21 Id 5192.87 S 58 59 Id 5272.32 S 58 41 Id 5351.53 S 58 30 Id 5430.60 S 58 17 Id 5509.47 S 58 13 Id 5588014 5 58 17 bi 5666.26 S 58 16 bi 5743.56 S 57 57 bi 5820.24 S 57 35 bi 5896.58 S 57 18 ¥ 5972056 S 57 I W 6048.19 S 56 41 bi 6123.71 S 56 16 W 6199.01 S 55 54 W 6273.82 S 55 57 bi 6348055  56 31 bi 6423.57 57 19 Id 6498.52 S 58 0 Id 6573.22 S 58 22 Id 6647.63 S 58 34 Id 6722.01 S 58 52 Id 6795.97 S 59 9 Id 6869.70 S 59 46 Id 6943.38 S 60 48 Id 7017.42 S 61 50 Id 7092.62 S 62 55 Id 7169.96 S 63 29 Id 7248.95 S 63 26 Id 7328.30 S 63 26 W 7407.90 S 63 29 bi 7487.58 S 63 31 Id 7567.38 S 63 40 Id 7647.27 S 63 42 Itl 7727.27 S 63 37 Id 7807054 S 63 54 W 7887022 lo15 0.66 0°80 0 °40 0.66 0.56 0.16 0.23 0.29 0.40 2795.83 S 4000.91 Id 4880.97 :S 55 3 Id 283602a S 4069.51 Id 4960.38 $ 55 8 Id 2876.96 S 4138.49 Id 5040024 S 55 12 Id 2917.60 S 4207°27 Id 5119.91 S 55 16 Id 2958°17 S 4275.89 W 5199.42 S 55 19 W 2998090 S 4344.12 W 5278.71 S 55 23 Id 3039.92 S 4411°88 Id 5357.78 S 55 26 id 3081.13 S 4479°37 Id 5436.74 S 55 29 W ), 3122.45 S 4546.55 Id 5515051 S 55 31 Id 3163.89 S 4613.42 W 5594.09 S 55 33 W 0.90 0.60 0.43 0.38 0.47 0.24 0.33 0 0.24 0.60 3205000 S ~679.84 W 5672.12 S 55 36 Id 3245.64 S 4745.60 Id 5749.34 S 55 38 W 3286015 S 4810.71 W 5825095 S 55 40 Id 3326.88 S 4875'27 Id 5902.24 S 55 41 Id 3367080 S 4939.30 Id 5978.19 S 55 43 3408.83 S 5002.85 bi 6053.81 S 55 44 Id 3450.14 S 5066.09 Id 6129.34 S 55 45 Id 3491075 S 5128.89 Id 6204.66 S 55 45 Id 3533057 S 5190.99 id 6279.53 S 55 45 W 3575.52 S 5252091 Id 6354.32 S 55 45 Id 0.60 0.55 0.49 0027 0.59 0o17 0.36 0069 1 2.26 61~ 29 S 5315*29 W 6429.39 S 55 46 M ]65 220 S 5378.10 W 6504034 S 55 47 Id 3698.17 S 5441.21W 6579.00 S 55 48 M 3737.38 S 5504.46 Id 6653.35 S 55 49 bi 3776.33 S 5567.82 Id 6727.65 S 55 51 Id 3814.72 S 5631.05 W 6801.52 S 55 53 bi 3852.73 S 5694.23 Id 6875.16 S 55 55 V 3890.20 S 5757.68 Id 6948.71 S 55 57 Id 3926.98 S 5822.00 Id 7022.59 S 56 0 M 3963.07 S 5888.10 Id 7097.58 S 56 3 Id 1.99 0.20 0.21 0.00 0.26 0.28 0.39 0.34 1.32 0.88 3999.10 S 5956°76 W 7174.67 S 56 7 Id 4034.75 S 6027.60 Id 7253.35 S 56 12 W 4070.35 S 6098090 W 7332.42 S 56 17 W 4106011 S 6170.38 W 7411.73 S 56 21 W 4141.88 S 6241095 W 7491.14 S 56 26 Id 4177065 S 6313.67 Id 7570.68 S 56 30 Id 4213.35 S 6385.53 Id 7650.32 S 56 35 Id 4248095 S 6457.59 Id 7730.07 S 56 39 Id 4284.77 S 6529.83 Id 7810.11 S 56 44 Id 4320.17 S 6601.64 Id 7889.58 S 56 48 Id COHPUTATION DATE: 18-APR-90 PAGE 4 BP EXPLORATION Y-IT (31-05-10-13) PRUOHOE BAY NORTH SLOPEr ALASKA DATE OF SURVEY: 06-APR-90 KELLY BUSHING ELEVATION: 80.26 FT ENGINEER: NCBRID~ INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED YERTIC'AL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG #IN DEG giN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY'NORTH/SOUTH EAST/NEST DIST. AZINUTH FEET OEG/IO0 FEET FEET FEET OEG 12000.00 8260.12 8179.86 52 3 12100.00 8322.20 8241.94 51 14 12200°00 8385.44 8305.18 50 13 12300.00 8450.1Z 8369086 49 16 12400.00 8515.42 8435.16 49 10 12500.00 8581.07 8500.81 49 2 12600°00 8646.60 8566034 48 55 12700.00 8712.61 863Z.35 48 26 12800.00 8779.12 8698.86 48 11 1Z900.00 8845.83 8765.57 48 5 S 64 14 g 7966.13 S 64 41 g 8044.06 S 65 25 # 8120.98 S 65 57 W 8196.59 S 66 9 W 8271.61 S 66 15 g 8346.32 S 67 14 g 8421.03 S 68 26 ~ 8495.09 S 69 43 g 8568.63 S 71 21 g 8661.22 1.01 0.72 1.27 0.55 0.19 0.98 1.03 I .00 0.96 1.64 4354.86 S 6672'97 ~ 7968.27 S 56 52 4388.65 S 6763.71 g 8065.99 S 56 57 6421o39 S 6813.92 W 81Z2.69 S 57 1 6652.80 S 6883.41 g 8198.10 S 57 6 4483.53 S 6952.63 g 8272.91 S 57 11 6514.02 S ?021.63 ~ 8367.43 S 57 16 4543.95 S 7090.98 ~ 8421.97 S 57 21 W \ 4572.27 S '7160.55 g 8695.83 S 57 26 W 4598.96 S 7230.30 g 8568.99 S S7 32 4623.88 S 7300.50 ~ 8641.62 S 57 39 13000.00 8912.80 8832.54 47 44 13100.00 8980.91 8900.65 46 25 13200000 9050.12 8969'86 46 15 13300.00 9119o23 9038.97 66 21 13400.00 9188.18 9107.92 46~25 13450.00 9222.65 9142.39 46 25  72 11 # 8713.37 72 33 g 8786.36 S 72 43 g 8854.28 S 72 55 W 8924.Z1 S 72 59 W 8994.31 S 72 59 ~ 9029.33 1.08 1.19 0.75 1.02 0.00 0.00 6667.00 S 7371,.06 I~ 8713.62 S 57 46 M 4669.12 S 7460.87 I/ 8784.69 S 57 54 g 4690.T4 S 7509.73 ~ 8854.33 S 58 I W' 4712.10 S 7578.77 W 8924.22 S 58 8 N 4733.32 S 7668-09 W 8994.31 S 58 15 ~ 6763.93 S 7682.72 ~ 9029.35 S 58 18 ~ COMPUTATION DATE: 18-APR-90 PAGE ' 5 BP EXPLORATION Y-27 (31-05-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 06-APR-90 KELLY BUSHING ELEVATION: 80.26 FT ENGINEER: MCBRIDE INTERPOLATEO VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZINUTH DEPTH DEPTH DEPTH DEG MIN DEG NIN~ 0.00 0.00 -80.Z6 0 0 1000.00 994.97 914.71 11 41 2000.00 1959.64 1879038 19 14 3000.00 2795.63 2715.37 50 41 4000.00 3408.92 3328.66 .50 59 5000.00 4026.50 3946.24 55 16 6000.00 4603.96 4523.70. 56 0 7000.00 5145.16 5064090' 55 48 8000.00 S732.79 5652053 52 35 9000.00 6342.29 6262.03 51 I VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/NEST DIST. AZIMUTH FEET OEG/IO0 FEET' FEET FEET OEG NIN 10000.00 6994.94 6914068 48 41 11000.00 7659.77 7579.51 51 53 12000.00' 8260.12 8179.86 52 3 13000.00 8912.80 8832.54 ~47 44 13450.00 9222.65 9142.39 46 25 N 0 0 E 0.00 S 62 14 W 66.40 S 51 40 W 327.17 S 51 30 W 844.70 S 51 52 W 1629.51 S 51 55 # 2410.47 S 55 50 W 3224.50 S 59 47 W ~064092 S 59 25 W 4873.62 S 58 17 M 5666.26 S 56 31 W 6423.57 S 62 55 ~ 7169.96 S 64 14 M 7966.13 S 72 11 W 8713.37 S 72 59 ~f 9029.33 0.00 0.26 0.90 2.57 0.82 0.35 0.69 0.36 1.15 0.90 0.00 N 0.00 E 0.00 N 0 0 E 30.58 S 59.1B ~ 66.61 S 62 40 ~ 174.63 S 276.68 W 327.18 S 57 45 ~ 492.62 S 688.45 ~ 846.54 S 54 25 M 981.20 S 1308.94 M 1635.87 S 53 9 M 1466.61 S 1926.87 ~ 2421.52 S 52 43 ~ 1965.76 S 2587.60 ~ 3Z37.53 S 53 4 W 2385.05 S 3304.06 ~ 4074.96 S 54 11 W ~ 2795.83 S 4000.9! N 4880.97 S 553 ~ / 3205.00 S 4679.84 M 5672012 S 55 36 M 0.60 1 1.01 1.08 0.00 3617.29 S 5315.29 M 6429.39 S 55 46 W 3999.10 S 5956.76 ~ 7176.67 S 56 ? M 4354.86 S 6672.97 ~ 7968.27 S 56 52 ~ 4647.00 S 7371.06 M 8713.62 S 57 46 M 4743.93 S 7682.72 ~ 9029.35 S 58 18 W BP EXPLORATION Y-27 (31-05-10-13) PRUOHOE BAY NORTH SLOPE~ ALASKA TRUE SUB-SEA COURSE HEASURED VERTICAL VERTICAL DEVIATION AZINUTH DEPTH DEPTH DEPTH DEG NIN DEG NIN COMPUTATION ,DATE: 18-APR-90 PAGE 6 DATE OF SURVEY: 06-APR-90 KELLY BUSHING ELEVATION: 80.26 FT ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH VERTICAL DOGLEG RECTANGULAR COOROINATES HORIZ. OEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH O. O0 0.00 -80.26 0 0 N 0 0 E 80.26 80.26 0.00 0 7 S 9 30 E 180o26 180.26 100.00 0 13 N 61 35 E 280.26 280.26 200.00 0 5 S 66 56 W 380.26 380.26 300.00 0 18 S ?.7 29 E 480.27 480.26 400.00 I 10 S 54 34 14 580.39 580.26 500.00 4 3 S 64 30 M 680.80 680.26 600.00 6 9 S 61 50 W 781.60 780.26 700.00 8 33 S 64 33 M 883.03 880.26 800.00 10 33 S 64 19 W FEET DEG/IO0 FEET FEET FEET DEG MIN 984.98 980.26 900.00 11 38 1087.14 1080'26 1000.00 12 1 1189.64 1180.26 1100.00 13 23 1292.73 1280.26 1200.00 14 44 1396.34 1380.26 1300°00 15 27 1500.07 1480.26 1400.00 15 24 1603.81 1580.26 1500.00 15 24 1707.47 1680.26 1600.00 15 18 1811.40 1780.26 1700.00 16 31 1916.16 1880.26 1800.00 18 11 0.00 0-00 0.00 N 0.00 E 0.06 0.00 0.10 S 0.01 W -0.04 0.46 0.21 S 0.18 E -0.17 0.33 0.05 S 0.24 E -0.01 0.24 0.39 S 0.25 E 0.67- 3.19 0.98 S 0.12 W 5.22 2.34 3.17 S 4.17 W 14.23 1.32 7.23 S 12,26 W 26.80 3.03 13.00 S 23.47 W 43.62 2.12 20.15 S 38.83 W 2021.85 1980.26 1900.00 19 25 2128.35 2080.26 2000.00 20 55 2236.24 2180.26 2100.00 23 4 ?-345.44 2280.26 2200.00 24 19 2456.24 2380.26 2300.00 27 13 ?-571.29 2480.26 2400.00 32 6 2694.60 2580.26 2500.00 39 3 ?-827.85 2680.26 2600.00 43 58 2975.92 2780.26 2700°00 50 5 3137.80 2880.26 2800.00 53 10 S 62 17 W 63.38 0.37 S 6?. 5 W 84.21 0.87 S 61 7 W 106.66 1.48 S 60 36 W 131.67 1.22 S 59 8 W 158.77 0.68 S 56 26 ¥ 186.34 0.48 S 55 16 W 213.91 0.52 S 53 29 W 241.17 0.66 S 52 7 W 269.34 1.94 S 51 56 W 300.35 1.68 3304.94 ?.980.26 2900.00 52 53 3469.53 3080.26 3000.00 52 18 3632.63 3180.26 3100.00 52 6 3794.29 3280.26 3200.00 51 34 3954.47 3380.26 3300.00 51 0 4113.65 3480.26 3400.00 50 58 47.71.45 3580.26 3500.00 50 22 4427.79 3680.26 3600.00 50 7 4583.81 3780.26 3700.00 50 37 4745.70 3880.26 3800.00 53 21 S 51 40 W 334.33 S 52 43 W 370.76 S 54 37 I4 411.12 S 52 23 W 454.85 S 51 30 W 502.2?. S 52 17 W 558.69 S 52 15 W 630.30 S 52 34 W 717.87 S 51 30 W 826.29 S 51 43 W 952.71 S 51 50 W 1085.80 S 51 48 W 1215.71 S 51 52 14 1343.76 S 51 51 W 1469.99 S 51 50 W 1594.35 S 51 55 W 1717.44 S 52 1 W 1838.78 S 52 2 W 1958.26 S 51 48 W 2077.29 S 51 42 W 2203.78 0.80 2.21 1.14 1.34 4.06 4.86 4.09 5.10 2.43 0.77 0.76 0.01 0.16 0.21 0.55 0.32 0.26 0.34 1.08 2.04 0.00 N 0 0 E 0.10 S 7 18 W 0.27 S 40 39 E 0.24 S 77 8 E 0.4,7 S 32 55 E 0.99 S 7 3 W 5.24 S 52 47 W 14.23 S 59 29 W 26.83 S 61 I W 43.75 S 62 34 Id 29.16 S 56.49 W 63.58 S 62 42 W 38.90 S 74.96 W 84.45 S 67. 34 W 49.63 S 94.73 W 106.94 S 62 21 W 61.82 S 116.59 W 131.97 S 62 4 W 75.41 S 140.05 W 159.07 S 61 42 W 90.15 S 163.36 W 186.58 S 61 7 W 105.65 S 186.19 W 214.08 S 60 26 W 121.57 S 208.39 W 241.26 S 59 44 W 138.73 S 230.89 W 269.36 S 59 0 157.93 S 255.¢8 W 300.35 S 58 17 W: 179.10 S 282.34 W 334.35 S 57 37 201.61 S 311.24 W 370.84 S 57 4 225.50 S 343.92 W 411.25 S 56 45 251.53 S 379.23 W 455.06 S 56 27 281.01 S 416.69 W 502.59 S 56 0 316.03 S 461.41 W 559.27 S 55 35 360.22 S 518.28 W 631.16 S 55 12 413.71 S 588.14 W 719.07 S 54 53 481.08 S 673.94 W 828.03 S 54 29 560.15 S 773.67 W 955.16 S 54 6 643.05 S 878.86 W 1088.99 S 53 48 W 723.86 S 981.62 W 1219.65 S 53 36 W 803.49 S 1082.90 W 1348.44 S 53 26 W 881.98 S 1182.77 W 1475,41 S 53 17 W 959.35 S 1281.12 W 1600.50 S 53 10 W 1035.83 S 1378.54 W 1724.33 S 53 5 W 1111.04 S 1474o67 W 1846.37 S 53 0 W 1185.00 S 1569.39 W 1966.52 S 52 57 W 1258.95 S 1663.60 W 2086.27 S 52 53 W 1337.72 S 1763.58 W 2213.53 S 52 49 W BP'EXPLORATION Y-IT (31-05-10-13) PRUDHOE BAY NORTH SLDPEt ALASKA COMPUTATION DATE: 18-APR-90 PAGE DATE OF SURVEY: 06-APR-90 KELLY BUSHING ELEVATION: 80.26 FT ENGINEER: NCBRID~ ZNTERPOLATEO VALUES FOR EVEN 100 FEET OF SUB-SEAOEPTH TRUE SUB-SEA MEASURED YERTZCAL VERTICAL DEPTH DEPTH OEPTH DEG #IN COURSE DEVIATION AZIMUTH DEG HIN 4918062 3980.26 3900.00 55 31 5094.38 4080.26 4000.00 55 9 5266086 4180.26 4100.00 54 29 5437092 4280.26 4200.00 54 9 5608042 4380.26 4300.00 54 1 5781.29 4480.26 4400000 55 24 5957.74 4580.26 4500.00 55 46 6138.69 4680.26 4600000 57 19 6327.00 4780026 4700000 58 14 6516.11 4880.26 4800.00 57 51 6702.47 4980026 4900000 57 8 6883.92 5080.26 5000.00 56 12 7062.36 5180.26 5100000 55 41 7238.23 5280.26 5200000 55 1 7410.51 5380.26 5300000 54 0 7579077 5480026 5400.00 53 33 7748.20 5580.26 5500.00 53 8 7913080 5680.26 5600000 52 31 8078.42 5780.26 5700°00 52 54 8245011 5880.26 5800000 52 59 8410088 5980.26 5900.00 52 44 8575.18 6080.26 6000000 52 20 8738.47 6180026 6100.00 52 5 8900.66 6280.26 6200.00 51 41 9060005 6380026 6300000 50 33 9216.08 6480026 6400000 49 52 9370.47 6580.26 6500.00 49 24 9523.43 6680.26 6600000 49 5 9675080 6780026 6700.00 48 49 9826.74 6880.26 6800.00 48 22 9977.76 6980.26 6900.00 48 42 ~10128.81 7080.26 7000.00 48 22 10278084 7180.26 7100000 48 1 10428.33 7280.26 7200000 47 47 10576.56 7380.26 7300.00 47 31 10724.55 7480026 7400.00 47 38 10874076 7580.26 7500.00 49 13 11033.39 7680026 7600.00 52 24 11198.61 7780.26 7700.00 53 0 11365.10 7880.26 7800.00 53 9 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/MEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET OEG S 51 43 # 2343091 S 52 3 bi 2487.58 S 53 12 bi 2627048 S 54 5 bi 2765.085 S 54 0 bi 2903.58 S 55 18 bi 3044032 S 55 47'bi 3189.55 S 56 4 bi 3340022 S 57 16 bi 3499.73 S 59 26 bi 3660.21 S 60 31 ti 3817.39 S 59 49 bi 3968071 S 59 56 ti 4116.43 S 59 59 bi 4261.04 S 59 44 ti 4401.25 S 59 7 bi 4537.79 S 58 53 bi 4673029 S 59 7 bi 4805.29 S 59 31 ti 4936002 S 59 26 bi 5069035 S 59 19 bi 5201.53 S 58 44 ti 5331.88 S 58 27 bi 5460.97 S 58 13 bi 5588066 S 58 18 ti 5712.77 S 57 52 bi 5832.55 S 57 22 ti 595.0016 S 56 57 Id 6065089 S 56 22 bi 6180.81 S 55 52 ti 6293.79 S 56 21 bi 6406.87 S 57 31 ti 6520.05 S 58 19 ti 6631.90 S 58 41 Id 6743001 S 59 3 bi 6852.42 S 59 58 bi 6961049 S 61 40 Itl 7073045 S 63 15 Id 7196.23 S 63 26 Id 7327020 S 63 27 bi 7459.75 0.64 0.89 0.59 0.26 0.83 0.69 0 0.92 0.91 0.89 1425022 S 1874.22 bi 2354.56 S 52 45 1514.44 S 1987.94 Id 2499009 S 52 42 bi 1599.39 S 2099.87 id 2639.61 S 52 42 id 1681.38 S 2211.86 id 2778.37 S 52 46 Id 1762049 S 2323.62 id 2916043 S 52 49 Id 1844.02 S 2438.67 id 3057.37 S 52 54 1926.08 S 2558.67 bi 3202059 S 53 Z Id 2010059 $ 2683.55 bi 3353.20 S 53 10 Id 2098.43 S 2816.77 id 3512049 S 53 19 Id 2182.64 S 2953038 id 3672.38 S 53 32 bi 0.27 0.13 0.00 0.51 0.40' 0.66 0.54 0.72 0.72 0.02 2261.12 S 3089.66 id 3828.67 S 53 48 id 2336.58 S 3220.92 id 3979.19 S 54 2 Id 2410.94 S 3348.62 2483.25 S 3473.93 id 4270.22 S 54 27 id 2553o61 S 3595..29 bi 4409.88 S 54 37 Id 2623.14 S 3712083 id 4545.99 S 54 46 Id 2692.76 S 3829.10 id 4681013 S 54 53 id 2760.93 S 3942.15 Id 4812.82 S 55 0 2827.54 S 4054067 2895.31 5 4169.53 id 5076.20 S 55 13 0.89 0.21 0025 0.40 0.75 0.48 0.50 0.20 0.45 0.27 2962.59 S 4283.34 id 5208.07 S 55 20 Id 3029.71 S 4395009 bi 5338.16 S 55 25 Id 3097001 S 4505.25 td 5467006 S 55 30 'd 3164.16 S 4613.86 Id 5594,60 S 55 33. Id 3229.45 S 4719.42 3292.68 S 4821.14 id 5838.25 S 55 40 Id 3355.71 S 4920.45 3418.48 S 5017.70 Id 6071.52 S 55 44 Id 3481065 S 5113.74 3544078 S 5207.53 0054 0.51 0.27 0.47 0.45 *0 1.54 0.23 0.16 3608005 S 5301.37 ti 6412.68 S 55 46 Id 3669.80 S 5396.25 bi 6525.86 S 55 47 Id 3729.12 S 5491.07 ti 6637063 S 55 49 Id 3787.26 S 5585.75 bi 6748063 S 55 52 Id 3843086 S 5679.40 id 6857.90 S 55 55 id 3899030 S 5773036 bi 6966.79 S 55 58 Id 3953.98 S 5871.18 Id 7078.47 S 56 2 Id 4011.04 S 5980.27 bi 7200.83 S 56 9 Id 4069.85 S 6097.91 ti 7331.31 S 56 17 Id 4129.40 S 6216.96 bi 7463.41 S 56 24 ti BP EXPLORATION Y-27 (31-05-10-13) PRUDHOE BAY'* NORTH SLOPEr ALASKA COMPUTATION DATE: 18-APR-90 PAGE "8 DATE OF SURVEY: 06-APR-90 KELLY BUSHING ELEVATION: 80026 FT ENGINEER: NCBRZD~ INTERPOLATED VALUES FOR EVEN 100 FEET ~F SUB-SEA DEPTH TRUE SUB-SEA COURSE NEASURED VERTICAL VERTICAL DEVIATION AZINUTH DEPTH DEPTH DEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 11532.29 7980026 7900000 53'23 11700o16 8080.26 8000000. 53 44 11868°49 8180.26 8100000-~ 53 5 12032.64 8280.26 8200000 '51 46 12191.91 8380.26 8300000 50 19 12346018 8480.26 8400000 49 15 12498.76 8580.26 8500.00 49 1 12651014 8680.26 8600000 4843 12801071 8780026 8700000 48 11 12951049 8880.26 8800.00 47 58 S 63 34 g 7593.17 S 63 42 W 7727.40 S 63 49 W 7862.18 S 64 24 W 7991o67 S 65 21 g 8114080 S 66 4 W 8231025 S 66 15 ~ 8345039 S 67 53 W 8459.02 S 69 45 W 8569.68 S 71 56 W 8678045 0.20 0.34 0.32 0.92 1.27 0.18 0.97 1.15 0.98 0.46 4189.19 S 6336.86 g 7596.39 S 56 32 W 4249.0! S 6457.70 W 7730.20 S 56 39 W 4309.07 S 6579.05 g 7864.61 S 56 47 W 4366.00 S 6696.12 W 7993.74 S 56 54 W 4418.80 S 6808.26 W 8116.54 S 57 I W 4467.03 S 6915.38 ~ 8232067 S 57 8 W 4513.64 S 7020.77 ~ 8346.51 S 57 16 W 4558.65 S 7126.56 ~ 8459.85 S 57 24 W 4599040 S 7231.50 W 8570.24 S 57 33 W 4635091 S 7336.84 ~ 8678.76 S 57 43 W 13099.06 8980.26 8900.00 46 26 13243061 9080.26 9000000 46 17 13388051 9180.26 9100000 46 25 13450.00 9222.65 9142.39 46 25 S 72 33 W 8783.70 S 72 48 M 8884.78 S 72 59 g 8986.26 S 72 59 ~ 9029.33 1.19 0044 0.00 0.00 4668.92 S 7440022 M 87~3.83 S 57 53 4700.08 S 7539.83 W 8884.81 S 58 4 4730.89 S 7640.13 g 8986.26 S 58 14 4743.93 S 7682.72 W 9029.35 S 58 18 SCHLUMBER©ER D [ RE CT ZONAL SURVEY COMPANY BP EXPLORAT I ON WELL Y-27 (Bl-O5- lO-lB I FI ELD PRUDHOE BAY COUNTRY USA RUN ONE DATE LOOOEO 06 - APR - 90 REFERENCE 73797 WELL Y-27 (31-05-1C~--'3) .... HORIZONTAL PROJECTION (1448' SNL, 387' WE._, SEC 33, TllN,R13E) NORTH 6000 REF 73797 'SCRLE : 1/2000 [N/FT · -~...4--4-~ 4--4..4--4...~..4 ...... ~4..4.-.:...i..4-.4,.4..,~ ...... 4-.4..+-4-, .4..~.4.4 ..... ¢-4.-;.4.-.-4..~.4...g- ..~-~4..4...4 ..~.4..-~..4 ...... g..~..-~....;..,~..4..4..4..4 ....... i..4...~..,.~-.4 ....... ~._i,,.~ ....... :..+...t .4..4...4-.~...~...:.., b4.++++~+4..+-..+.-~...~.-~..-~...~-4-..~..4..-..~4~.-~..~-~4... ~.-+-++-~.~.+-~---4--~-~+.~.-~-~.~4-=.~.4--~--.;-+..~...~...~.-.~ ....... ~-;..;.4...f4...~..~4 ..... ;.4-~-.-~.-~...~..-F.;--F. 'M~--~-~-.~-,-~-.~.--~ ..... *.--;---.~--.~.--~ ~ .... ~ ~ ,~ ~ ~4.-~ ~ ~ ; ~-~ 4 4.4-~-; 4 4.4- .4 ~..4-;.,:.-~...~...~...~ .... ~...F..~...~..~....L-L-~...; ....... ;...~ ~.; ~ L.; ~..~ .... ' .4...J,....~....[..,L.,.;....F..g.. "?'t"t'"?"~"?'T"~"~ ....... T"?"??~'"??"?"~ ....... ?"?t'"?'"~"'?"?T"t'" F'?"T"?"~"I'"T'"~-~"?' "'T'"??"T"~ "~-T'?"t'" r-'~'--?'"r"?..t"f'-'f.'--r"~ ....... .-$...4..-4-4---,-4...;-.,~.-~--....~.-4..4-.~...~...~...g-4..,~ ....... ~..-4..4.---F..~..4.-..~...~..4.-. b..~..4..-~--.4...~,..~-.4..4..4......4.-~..-~...~...4 .-.~.4...g.-.g..-L....~...~....~..4...~....~.-.~-4.-4 ....... ~....~...~....~...1...~.-.~....;....~ ........ ~..4....L...~.-~..4.. ;..4...~... .4..~..~.¢.~.,L.,L.4 ........ L..L..L..L..L..L..L..L..~ ....... L,.L..L.-L¢...L..L..L..L..b. L4...L..L..~...L..L.g...L......L4...L4...~.4...L..~.4... .-+?i-+.~.+-~.--:-.-~ ..... f"+'+'+'+'~'"i-'+"~ .......~-'+'+-+'-F-~'--ff-'-i'" r--?e'-~-+T'f-'f'--?"!- "+ff'-f'+"',-'t"f'+'-?"~"'f'-+"-b'~--','"~'--~-'~"~ ....... ~"'t'"?"~"'f".'"~"+'"i · ..i...!...i...~.-.l...-i.-.-i .-~-..i ....... i...i.-.i...~..-i...~-...~..4....i ........ i.,..i.-4.-,i...~...,i.,.-~...~..-i ..~, 4...i.-.i... -' .4...~~ ......... 5"', ....... +'--!--';--[ ...... ?.¢.-;--¢.---'..+.-i-.!..+"?~ ....... +"'-~ ....... .-5.-+..i-+"5"-¢-?"5 .......... -~4.--~..~..4-.¢4.--~-.-~ ....... ¢..+.-¢...~.-..P¢...¢...¢...~ ........ F.~---¢----~-4--¢-.--F-4.--~ ....... ~.-¢.4.-.~...~-.-¢--.~--+-.-~ ........ F.¢.++-.~.--.P¢..-4.--~ ....... ~...~--.-P-~...,--..F--~.-+..~ ....... ~..-¢..+.+-.~...¢...~-..;..; ...... -; ....... ¢--+..~....F.-¢..+.+.. ._Li..i.X; i..i i i.~..i..~ ~ ~. l J.~ ~; .... ~...L..~....;...L.L...L.L-i ....... i...i...L.Li..L.L...L...L....&..i...L.i...i.._L.i._L.i ....... L.L..L..L.L.L.L,.L..i ....... i...L.i...i...1...i.-L..i-i..-LL.L.L..L..LL.L4...J ....... ....... ....... .......--- ',...~ ...... ~ ..............~ ................................ L..i ........... J ....... ; ......... ~ ..... .... ...i4.--.i ...... 4_,...~.4..,..~...~...;_;......;..;_;...~_.¢..~ ....... ~...~ ....... ~...~....~..~..~...~...~...;,.~ ....... ~..-~..-~...~4.-.;-.;.~...~..~..;-..~...;..~...~..--~-.~..-~...~.~-~-~....~...~ ...... ~...;..~...;..~..;...~...;..~.....~...~...~..~ ...... ~...~...;..~ ....... ~....~...~...~ .... b~--~-~-+-.~--¢--%4~-~---~-4--.~.-.~---~---:.--+--4--~4~--~.-.~-+~ ....... +-~-~--4--~+-+-~--~.-+-~--+-~=~4+-~4~L~..4-.+.~..j.4...~.¢.~ ..... ~-..~.-~'.+.-,..¢4--4...~ ..... ~..+.¢..;,.L..~...~,..~..+.- :'"?"+'"+'-+'"1'"+-"?"~'"~ ....... ~--'+---+-"+--+--+"'-}'"?'?" "-~"'S'-~'-}"~"-?'"r"?"~ ....... ?"?t'"?l"'t"'~"?'?' "~'"t"'~'"~'"l"'t"~"~"'~ ....... f'"~'"+"*'"t '"r"?"?~'" ~"'t'"?"?"! ....... T"?T"t ...... ?-'~'"?"~'" ~'.'t--.?'"r"~ -~+f-+'-f++-~-+----+-'f-+"f-+'-f'-f-+--f--~"-f--f-+--f'+--+--f-+-~ ....... f-+-+'+++'++-f-' --+~+-H..+++-.~ ....... f~..f.++-f.~ ....... H--+.-f.-. :'T'"?'T"~ ...... i'"i'"I'"~ ...... I'"'~'-'!-'i"T"i"'i'"~'"i ..... i'"i"T-"~ ....... i'"i"'i'"I ...... ~"T'T'"~'" '?'T"I'"i ...... T'T'T"I ........... . '"~"?' ~'"i ...... ~'T'"['"I ....... I ~' F i ...... ~"'~"'F '! ..... i""~"T'? i "I'"i'-i .... ~.4.-i ..... ~..-~--~..~.-, ....... ~.,~...~..~ ...... ,,..,...i.-.i ...... ~ ~---*---~---~--'~-'-~'+,-~ ...... ~---e-,~'--~..~,~'-~-+,+- !~--~.,-~...* .... ..-.~',4,-i ....... ~..4...~,..~ ...... ~ ~--~,,!.',~-,-,--+ff.-~i ...... ~-,-~,'~-..~--' '-+'-?'-~'"~ ..... ~ ~'-~--'+-~'-' ;-..~-++.+--f.~.-~-.+-~ ...... ~.-+-+-+..t-+-.~~.bq-..?e-+-~ ...... ~..+.+.+.~..+-+-.~-+;,4~..~ .......i-++..! ....... ~..+-+.+-+.+.+.+-~ ....... ~.-+.+,.~ ....... ~,.-.?.+.~ ...... ~"+"t"~ ....... t'+"i'"i .... ~+-..F.-~4--+.¢--i---~--~ ...... i--+--i---i--+-+-4~~---im--+-+--~---i...i ........ ~---i..-i.--i---,.-~.-~.--~.~ ...¢--i--¢..i ....... ~..-~.---~.-+.-!...~-.-~-.+--~ ....... i--~--!...~ ....... !,--~-i--i ...... i-+-+..i.--~-.+-i.-~-.~ .... .... I-..i-4..4 ..1,.-.i..4....i..4 ....... ~....i..-i-4....L-.i...i~ 4..4- ~...l....i..4...i..-.i ...... ~...i...-i...i...l..4 ........ M~.-i.-~.J.4-..;4-.4 ..... i.4.4.4.~i.4.~.~`.~.i...pL.i~.4~..~-i~.~..4..~4..~.~.i"~.~.i-i~i.~.i.4.~-~..~4.4~..i ....... i-.i.4...~..!....L..i...4.-.~-.. =i-.4.-4.4 ..... i.--i~4---4-4.4-...P L.~...;.~..i .... L] i : i : iii : ~l~i :: ~ ~ i~ ~ ~ : : ....... ....... ........ ........ ....... ....... ...... ....... ...... ...... ....... ......... -.~-+.,~-~ ....... $-.-~.--~-.-$ ...... $.--~.--~.-,~---i.--~---~-.--~-.-~-4..;-4-4.-¢4-..~.-4--~-.~---~-4--~-~~.~~H.4.-.L..4...~.4-~..¢.-~.4..+..~ ....... ~..+,+...~....~ ...... $.4...+ ...... ~..-~.-+4.--.-.+-.~..-$--.$--~---$-.+.¢4 ....... ~..+4..-+ .... ..~..~..,.,_ +~...,~ ...... ~...~._~...~...~...~...~....~...,.~._?..~...~....~...~_~....~...~...:~+..~...: ..,.: ..... ~_.~_~..,....+,..~...,.~....~..~..+..~...~...~..,.$...~....~....~..~...,.~ ........ ~...~..+..~,....,.~...,.~ ...... ~.._~...~...~ ....... ~...,.~...~ .... ...:..~...:...:......~.~:...:...~...~..:...~...~...~....~..:...:...~.~.~...`~..~....~...~ ....... ~--'~4 ....... :'~ ~'"'~::'-~--'~ ....... ~'"~'"~'"~"'"-~'":""~'-':-' ~~ '~~~--- ' ' '[ ' ~'"~"'~'"T"~'-I""F'"T'"T"']"~'"]~"T ...... r'"~;..4::]"'Z:~] -.~.-~.-~.+4.4-+..,,..~..~.4-.~...~.4..-~.4.~--~~.4-.-~ ...... ~..+-~.+- :..~..~-+.- --~----~--4-.-~-..4 .-¢-+.4.---~ ...... ~--.~-..~..-,~ ...... ~~ ~+..4.-.- ' ..... ~....~ ...... *.--+.,~...~ ....... ~.--~.--~---~ ....... ..., .;.~., ~ ,..~ ~ ~.~ ~ ~ ,~~-...~...~..~..~...~. ,...~ ..... ~...~.~_~ .... ....... -H--+-+--~--+-+-+-+--=+-.f-+.-H---f-,f..f--~ ....... !.--f--f-+-.,.4------i.-++-~..+++-i- ..i..~L&2_LL.LL. L (..L.LL.L.L.Z]X.;.; ...L.L.LL.LL&LL4.].4 ~X- -.?.+..t.-t+.?.-??-~---,--,--?+-~ ..~ +~.-.~ ....... ~-.~--.~.-?~-.-H..i--~.--~-.-H--+..~ ....... · -, ~....r--~ ....... r'"r-'?"~' .--.?,-'??-.?l-"?..?r.-~ ....... ?'?"?-rTT'~"'?"? "?'I'"~"~"~'"?-P?'"I ....... r'T'"P'I ....... r'T'"F"I ....... F"?F'T'T"'~'"'F'"F'"f ...... T'"';""r"'?T"r"'~"'T'"T ........ ?'"F"r"?'T"'~"T' ':'"'~ -t+++..~.--f++ff ...... f--f-+-f-i.-+-+--i--i ...... f-.f-+-~l-i-~-~-.!~.-ff.-+-+1.-+.!.-+--t--.+-t.ff---t-~.--ti-.-~-t ..... t'f't'TT't'"t"t"+" "ff'"'!"";'"-~"'t":"i"+"i ....... r't"t"f--?t'"~--'='"~"' ~?"~!'?'?"ff'"'~-!'' ""*""~'"!'"'~'"1'"?'?"?'"! ........ ~'-!--~'!"1-'!"!'~'"!"1 '"~"!"!"~'~"!"~'-t .-;~; :; '..L.L.L; ....... L;....i...L LL..L_M ..... L~.A.-i...~..LA~.4...'~.~-L~,~. 4.~..+-~.-.~-~ ...... +.--+.--+.-4.+.-++-+.---+..~..-+--+$+--.~-++-~--.+.--;-+-~-%-+-;..-~--: · "5"4'"¢"'5"+"5'"+'"+"'¢ ....... +'"?'"+'"~"'~"'+"'+'"i'"5 ....... *..4.---~----~..-+---~..-.?--+---5.--['"5'"5'"5'"5"+"'?"5'"'~"'?"~ '"'}'";'"4'"4'"i"";'"~""t "'5 ....... 5--"F--r -?-~-'";-'"r -'r "-r ....... +'-r--?'-'?i'"'""~'"? ......... '-'~ ........ ?'r --~'"'r '"r'-?'"r"~ "'~"~'~"+'~"~-~'~ ...... ~"'~-~'""""""*"-~"'~ ...... ~...;...~..~...".~...~.~.~...~.~...~...~....~...}..~..~.~..~*..~..~-~...~.~...~...~.."~...~ ....... ~'"~""~"~'"t'~'"~"'~'"~"?~"'~"'~'?""~'"~ ....... 444 4-,-~--;4.~- ~.4--¢4-.~-4+4-¢¢-¢.-¢-¢.4---4-¢4-4--~4--4-.- ..44..4-~4-F44..-+ ...... ~ t : , : : ; : : : : : , : : , : : : : I : : : : : I : : ~ : ~ : : : : : : t : : : : : ~ : : : : : : : , : : : : : : ; t : : , : : --~ G-~ -~i i 4 -. ~.~ ~-~.. 4-~. ~ ~ ..4..4 4..4 ...... i-~..~..~,... ~..~..-i...$.-$ ..... ~..4...-~.-.~ ..... ~...~-.~...e- ..-~,.~.-~..~.....4.,.~,..~.--~ ...... ~...~...~..,~ ..... ~....~...~...e ...... ~...e,-.~.~ ...... ~..e...e,.-~,.. ~....,.....--.- -~000 -~000 -4000 ~l'rH - 101)01 - ]0000 I. IEST WELL Y-27 (31-05-1( 3) (1448' SNL, 387' WEL, SEC 33, TllN, R13E) VERTICAL PROJECTION GEl. -4000 -2000 0 0 2000 4000 SO00 8000 !0000 ..~....~_2....;.mL...~...;..4...~,...,-4-.4..4-..~..4,..--~..-.~...¢...-~ ...... ~...-;....k..~- ~-~-4.... L.4...¢-Z..4..4.-~..~--~..~-...L..;..~..4...1...¢.4.-.~..4.....4..4..4-~-.~.-~..4-4....~ ...... ;I''¢~''';'II4'''~'II'~I''~'''~¢I'~ ....... ~l'4'''~II'~ ....... ~'I';I¢'~'''~ ' ~ ~''';'''~--]''';'''~'''~''4 ........ ~''4'''+'''~''~'''~--'~''''~'''~''' ~'~''''~''4''''~'''1''''~''''~''''~'''~ ........... ~''~''4'--~'--~'--~'''~''';'''' ''4''4'--~'''~''~''';''4'''~--'~ ...... ~''';'''~''';''~''''~''--~''4''''~ ....... ~''''~'''~'''' ''4''4'''~''4''''~ ...... ~''4 ....... ; ....... ~''4''4'';''' ,..i..~-?t-T.~.-??--t ...... ?.?'~'-%""~-"?'"r.?'?-. -~'-'?'-ff.-,t-T'"r--?--'r'-~ ....... ?-'?'k"t"'~"~"+"~--'~-' '--f"-~--ff-'~'-'T-'?-?f'--? ~"~'"??"?'T'?'-r"?"~ ....... ??"r"?"~' ~...~'"?-'~ ...... t"-~" ~'"f-'~"72'"%'?'" ========================= ~ i ::~: i::~:~ ~:::i::;~ :t;;i:::,::::L~:~% ~ i !:: :: ! i i:1 :~:::t :i::i: :~ ::: ::i::H:::t]:i:i::t i:: ::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ...;....L...~.-;...?;.-4....~,.-.; ....... ~..-~.-;..-; ....... ;...;....;....~ ....... ~,..~%~....L.~,...~...;....L-; ....... &..J,....~....h.~.-h4...;...; ...... ¥.~.,-.F.t..~..,¥.~...;.4 ...... ~---~-;.-.:.-,~.--.~.---F.¥.~ ....... ~...-~..¥..+...~ ....... ¥.¥4 ....... ;....;..,.;...~ ...... ;..-;....;...~... ...L.L.~ ..L~..L..L.4...i......4....L..;...L.4...L.-L..4,..;...~...;,.-L.~..L..~...Z.J.~;~; ........ ~...&..;...;..4..-~..4..-;..4 ...... 4...;.,.;...L..~...~...L..~...~.....4...;...L..;...~--L.-~...;...; ....... ;..~...;...;..4...;..~...4...; ........ ;..4...;...i...~..4..-L.,;...¢.. · ..;---;-;-.-;---~--.;-.-~..4---~ ........ ~....;-.;--.;...+.-;...+....;...+--.;4-..~g~4 ........ ~.4..-;...;..-~..4..4...;...; ....... ;...;....~...;...~..-~---~..;.4 ..... ;....;...;...;...~...;...:,...;...; ....... ;...;...;...;-.+4...;...;...; ...... ~-z:::;.4...L;..-;.-h~::...4....~:..;.~]~ ~;,4...,.2~...;4.-:;,..~...;...; ....... ;...;...;...;-..L~...~...~4 ...... ~...~.4...;...~..4...;...;...~ ....... ~...-'~.444.-+..¢-.;....~..: .-;..4...;...;...:..4..~..;....;... · ..~--k.~.+-~--4---¥--~---~ ...... ~----~-.--P-~-.+--.~----~---~--~---:----~.-~~.~,--' ~M~¥"-~'-'-~.,--F-F-4-'---4--'~ ........ ~"-f-'~'~"-+--'¥' ~'-¥-¥'¥'¥'~'-"~"--h-'+""~ ...... f'"'P+"i"l'"e"f"f ........... f.-.¥.~.-.+....--4..-?..?--~... .................. :::::::::::::::::::::::::: ...... ........ ..4.. ~...~-~...~...~-..~....~...J ...... F..~,--F.J.--~.---~----~..-~.--.~ ....... ~--..F-~--.-~-.-~---~---¥--~-..~ ........ k--~-:-(.-+--~.--~---+ ....... ~,.-+-.-+--.-k.~-+--~--+--+ ....... ~.-.+.--~--+..~-?-+-H ...... ~...~...~.-~.--~..-.~.-+-+..~ ....... +--+..~--j.-J--¥-+.-~-.+.. :::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::: "ff"ff'"Y'?t"~'"t'-~'"? ....... f'?'?t"T"?'T'-'f"T"'l""F"r-r'"'r"?'"~'~-'Z'"t ........ r'~"?~ ....... ?"'T'"T"T"T-T"'T"T'"T ........ T'-T"'T"T"T"?'~"'t"T ...... ~'~'~'T""?"~--~ ...... T?T'?~'T'?"?-~ .... -~.~..~.~-;..~.~...~-4..¥.-~...~..+-.¥..F+4,.+,--~ ...... ~.4--4---~.,-~---~ ....... ~-~---~..+.-~.-¥-,~--~-,-~-,~ ~..~.,~.-~-~-,--~-.~-¥-~.-+.+--~.--¥.~-.-~--+--~.--~ff-~..~-~,--i--~-+.+-+-~. .-.;.--~-~-..~ ....... ~,.,?--.-[ ........ ?---~.---~.--~--+--F-.~--.-,..-F.'---~-..-~-'- ~ ,-'----~.-¥--L-.~ ....... F--F.-F-¥-.F..~---F¥..~ ....... ~-~F.-F.~....F--'....?..~ ...... ~-..~.--J--~..-+...'-,.,'..--'....~ ...... F..'...~---~ ....... ~...h.!...; ...... ~.-..k.H... ~,..-F..F,~...,~ ."?T--?t ...... ?t'-?-t ....... ~-'--r'?"'?"l'"?"??'-~ ....... r"'r'-~--?'"?'-r"t"?"t ....... t'"???t"-r'?"t'"t"l "'~"~"~"~'" '"t"'t"'t'"t"'t"~"'"'t'"t ....... t"?'?"t ..... T'T-T'T"~ '"T"~-r"T''' '?'T"T'"T .... .-~;--~i~-~..:..~4~ ...... ;-.;.-~...;..~ ~ ~ ~1 ~ ~ ~ ~'"';'":'"~'"; ....... ~; ~ ~ ~::: ' ..... ~":'"~";'"'"¢';";'":"'~ ~ ~ ~ ~ ~ ~ ~ ~ i'~S~ ~, i"~'~'"~';"' "~";~" '~'"~+-;'":-;", ~ ~ ~ ~: ~ :"~"~"~'"~""+'+~ :, ~t ]~H~,, ,"' ' -~ ~:i !,t,'*' '+'- '-~'?'~""-'%'?'~'"t'" "?'~'?'~-~'"?"?'~'! ...... i'"t"-Y'"K"?""~"?"t'"~'" "'t'"?'?"?"~'~"?'?'"?'l "'?~-~"t"~-t~'~'q ' "~'"t"~'+"~"'~ ..... ~"~"?~--'~"~ ' '~ ' ~"+-' "~"~"~'%'" ~[[~: : : [~]]]~[]~[]~[~][]: : : : : ]~]: ~[:'~"'+"~"~'"~'~'"~'""~ ~.~ ~ ~; ; : : : :~ l~; ! J i '..,.L. i .i...;. ][]~]~]][~]]~][~]~[]~]][~i i i i ~ : i : :.~,.., ~..~ ~: i i..i,, i...i...' :.,,2 { : : ~ : : · i ~ : t ' { ~ ' t : i ~ I I ~ ~ ' 'rv',.-~",~v" ?:"~.]~]]~]?...~..]~]].~...t.]<,.,..,-,~..-,~,~-_'-'¥"t.~..r"~-~ ............................ ~ .................................. ~"~"~ ''': ...... ' ........................ .................................. ,..,-..~.-+.-.~--., -.~..~-.-v ......... -.+~-- --~.~4--~ ,-~-~ .......... ~--~-J-.m- ~t'"+'""{~" · --~"'? ...... , ?'"?"t"~., ~ ~ ...... T"'~"T'"T'"~:: = "'Tm'-~"?'mT"'. ...... h'~"?'?"+ .... ~ ~ i ~ ~ . :. ! ~ t'4'4'~'4 ~.4-.4 ~ ....... L..~..4...~! ~.~ ~ ~.~_~...~..~ ....... = ' : : ~ ~ ~ : =~'"~"'~""~'"~'"'~-'~"'~'"'~ ....... ~...~...;...~...~.._,..4...~..~...,...~...;...4...~...~...~...~...~...~~:: ~ , : : : ~ ~ t , , ~ : ~ .... ~ : ' : ~ ~ : ' ' ' ' ~ / : ~ ~ ' ~ ~ : .+++~4--+--~-.~.~ ....... +--+.+-+4.,.~...~-~ ...... +--+.+.++-+--~---+...+ ....... ,.++-+-.-~.-+.+-++-~.+.+-++4.-+-.i...,--+ ....... ?4~.---.++-+-.t ...... .+...i--.~-~ ..... !---t-~-i ....... i?-i-.! ...... i.-i.-+.i ~4 4 ~_~.5 4 _~ j '.i _z 4 ~ j ~ ~ j. L ..,._; i .¥..i i j j '.j ~ $ $ ~ j ~ j $ $ ~ ; _~ ~ ~...+...~...j...,..~_.~...~...~..4..~...$...~.....~..~..~.~..--.ff-.~...~ ..... +.-~...+-.-5-~.-~--- ~---~...-P--4---4.-.$,.-4---~----~..-4 ........ ~---,h---?--~,--J-,,~---~-~.~ ...... ~---,~,--~----~----~, --~---~--- ~ --~ ........ ~.-- ~---~,--~---J- -h,--~--,~...4---~ ,--~,.-~---~--, ~ ...... ~.-.~---~--.~ ....... ~ "~'"~'"~'" '""~"]~{ ~ ~ "Z'"?"Z ....... {'" ~'"?"? q '1"?'"?"~ ...... }' ~'"?"T'~' ~+~-~-~-+-~-~ ....... ~.--i++-+-~--~ ..... '~nnnF~.-+++--.-+++-~...H+~--~~.+-~-++4.-~-+~ ..... ~-~~--+--~.+++¢- ~- ~-+~<~.-~+4- ~.z.4..4..4.q.J...~.J.4......4-4..J..-~44...4.~.~ ..... ;....~....~....~...~...~.4...;...~ ...... ~...~...~..J4.-~..4.4...¢... ~-.;.;4..+..~...~...~ ....... +.++.+..,.., ....... %:"+"~'"?+2 "Z+z+'-T?'?'* .... s.4-4-4-~-'-.4...¥+..+.,..-4..~-+..~..4-..+...~:?-.+ ...... ¥+.-~.---F,~.---F+-.¥¥--..-4..-¥.~---¥-~.-4.-~--¢-4 ...... ~-4--4.4..+-4..-~..-~-¥.,-.-~.-+-4-..~.-.~.-4.-.' .:..+.. ~-4.-.¥.+ .... +-.-~4--i .... , ¥ i-~ ..... I-.¢.~-.4 .... :.-4..4..4.,4-.4....F.4-..~ ....... ~--..;..-~..4-.4..-;.-4~--F. -4.-,-F¥---F,¥..~.--¥-~..-~-.-.--+--~..-~---H.-4.-4-.-~--.~ ...... ~..+.4.4-]-4...+..-¥-~ ....... ~--¥-¥4--.~.-F--,--,;.--~ ...... ~74.--.~-:~-- .4-+.+-+..-,--+.~-~-+- ..-4..4..4.4 ....... ~...;....L.~ ........ ~..-.L.;....L.4...L..~ ..... ;..,; ....... ;..,4..-.~-..;...4..-; ....... ;...;...;...;...~..-L.4....L.; ....... ;...¢....~.-..~ ....... ~...;.-.;-..; ....... ;...;._~...;.. ;..-~ ......... :..4 ....... ¥-~.~4-.. t'~" "'¥+";'"~ ..... ;..¥..4...; .... .... $--4--J--J-----4.--+--4--.4 ....... ; ....... ;--.4.-j ........ 4-~4 ...................... { ............ 4--4..-.--4--.4--4..,;---~,-4-~--4--.~--;,.-4---4--4.4,-J-~-.~.-.4.-4 ........ ~,-.4.-.-~...4.--~--~,--4 ...... ~ ...... ~"'+'"+"-~'" {'?"~ ~'+"~'!"' "!"-*'~"-) .... $ j j.~-- .j-; -~ ~ .... j ~ -~ ~ $ ~..j%.~....L..= .j..-~....~ J....~. j .~...~ '-$. $ J...$ -~ -~ ..~ .~ .... $...$-.~...L..J.-.$...$...2-..$ ....... j...J...J...~...J....L...' ......... ¢ ....... J....h..;..J ....... ~..~.J...J...,...~--~-j..-~..--.J..J...J...$ '-'!-'i-f-i-i-i--i'-?f-",'-f'¢-~'i ..... f"~'~'-'" ,-i ....... ~""~ ....... 4"~'"T'-~"" "4"~'"4"'T ...... i"~'''~''~'' -% ...... ~'" "%"T-T"~"' '"T'"T"'T'"?'" '"T""~"'T"'T ....... T"'T'"T'-T'"' "?'"%T"I ..... ...... T"T"?"T" "?~?'1 .... ....... ....... ...... · -~---J---J---4---+---J---4---h.--h-,~---h---~ -,.h--4,.-~.--4---.~&.~ ....... h--.~ .--~--4-.-~ ---;---~---~-,-4---:---~.--~---~---4 ...... ~---h--4,--4 ....... 4---,~--~--~--.t--J---~---4.-4 ........ ~,--.~---,f.---~ ....... +.-.-f--,~-- ~ ...... ~-.--~.--~...~ ....... ~., ~,--~".+ ....... +'-q.-.i..-~ ....... ~.--~ .......... ..~..~.?. _?..?..~..? ..... ?'~"t"~' '"?'"?~? ....... ?'"?"?'"? ..... t'-?'"?"t ...... ?"?";"'i-')"~"~'~"?-"--~"~"~'?" "~'?'"~-? .... t"? ? T" ? ~ T ~ T : : . : , ~ · , , ' i : i : ) : ........ ....... ....... ....... ........ .... k'"? "~'"'? ': '"'?"~""h"~ "4 ""~ ........ k'-k '"'""?"k'"~ '"~ ........ h'"r '"m'~' -'F "~'"'? "r "~ ........ r'"r" )-"~ .... r'"h '?"'t ....... r"?'?'r'T'"r'"~ ............ ~ '"i""'F"~ ................ ~'"~ ........... T'"F'"'F"r"~ '"'F"F'T'"~ ...... T ..... ~"~ ........... F'?'"'F' ...~..~..~.~_..~.4.4_~... -~....L~-.~-~-..k.~m4.-.~ ...... L..~..¢..?.-4-..~..~.--~...~..~--~...~.4-f-~.4-~...~-.-4.4-~.~-.~.-.~..~...~.-.~...~ m..~.4,''~.''~......~.--~..m;..m~ ....... ~' '~'''h'~''~''+'''F~''''~ ...... +''~''~--''4''~'+4''' ~._ i.~ ~ ' ~i~ ~ :; ~ ~i_t ~ ~,~ ~ ~ ~;y,.~_~Y.~.,;~ ~;~ ~ ~ z~ ~ ~.; .... ;.,~...;..+..,~...;...~m..; ....... ;..~...~...;.--..~--~.,.;...;m.. .--+-~-~+-,--++4--+-. -+-~-+-+-+-~--~--~-4---;-.4--4-F?f-+~- ~.-++,++--k4 ....... H.-4-4--.f?kH ...... ~-'t-i'-'t--¢'i--~"? ....... ??'"t-"t'-i"-t-f-'t'"t ...... t-'t'i'-t-----i-i-?~'-- ]-J ........ i Z~} ~ ~ J 2 1 ~ .... J ~ i ], ]-..J ........................ ~.L..-2 L~..j ~2_J...L. _J..L..~ L. -J..J...L.L..-J-L.L.L...~:~.~..L..J...$-~...L.z..~..~....~...~....~....~....~....~~ ~ ~ ~ : . ~ ~ ~ ~ ..... j1...~...~...j~ ~ ~ ~ } ~ ~ ~ ~L..2...z...z ....... 2..~_L.J~:: ..... .......j ..... ?..?.~.~_.~..?~..?~...~...~...?.._?._?~....?..~....?..~ ......... ~....??.~..¢.??~ ...... ~--~...?..-??~--.i ........ ?''~'''?''?'T'?'''?!'''¥'??'~'''?'''?'''~''''~''''~'''l~'lll~ ........ ~''''~'''l?'~'''~'''?'''~'''~''''~ ...... ??'''r''?''?''?''''~''' -$-~4 $ $ 4 -~ ~ . 4-4 ~-4-.f $- ~ 4- ~--- -4-4-4--~ ..-+-4- ~-4-- -4.4-~-,-~4--~-~---.-4--.4--4,--~-. -.4..-~--~.--+ ......~ +'-~'-"'"+'"+""~""~"*'"'~ ....... +..-?.--T.--.-T--+...-...~'---* ..... ~-*'--"'T'- '-~T"?"T- ~}~T~ z ~ ~!~ ~ ~. ~ ~ ~ ~ ~ ~t~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~?~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~.: : ~ .z ~.z...~ .'._L...L_,..%.L_'...:....:... ~'-FT'T'T'TT-F'T" "T-F'T-FTT'TT'T,'""~I~'TT'%-T'T'T'TTTTT"~ '-T'TTTTT'T'T"T' ~"'T'TT"TT-F'T'"7? ....... T ?"T'T-T -T'T '~ ? ....... ~ ~r ~ ~ ~ .... : ........ 4.+~+~+++.~_~4.++.~..~_~...~.+.~....:;:;:[::~::F;~::;:~:: :~:~::~J:t~:~::~''~''~-~'~''' ..~.-~...~-~-..~..~-~...~...-~....~.--.~...-~ .... ..................................................... ~-.-~--.?.?-?.-.-.¥-¥-¥.--h-+.--~---¢--¢.--~ ..... F.¢.¥--¥.4..-h--¢..--¢---~ ....... +..-+--+--+-+--~---.~---?~ ....... +.'-?~--++"~-'-~'"+-"~ ....... ~""~ ....... ¢.-~..r...~...~-..-~ ....... ;--.¢..-¥.¥,..--h.-~--.~...¢ .... I : : : : ~ i : { ~ : i i : . : ~ : · : : : , : : ; : : : * ; : : ..~-- .~.?~-. -~-~..~..4 ............ 4--~--.~-~.--m-+--?~.--,.?~--?-~--¥-~-~.?..?- ..~...~_~..~..~..~...~...~...~.,. L.~...~...~..,.p~...~..~...~...~...~ ...~..4...~....h.~.-~...~-..~...~ ...... ~--~-~...~.-- L~-~.~...J... ~.-..L ~.-.J ....... ~...~...¢..4 ...... ~.-J.-.~....~..-J...~..-~...~...~ ....... ~.--~,-...~...~..4.-..~....~....~.--~ ........ ~..4.. 4...~,..~-...L...L...k..~ ........ ~....L--.L-..~...LL...~,....h-.~ ........ ~....L...L.,.L..~ ...L ..h,.~.,,.~ ...... ~ · ~.-;.-~ · .~...,~.,..~-.--h-.-~ ........ ~'-"~" ¢'. ~ ...... ~'-"; ......... ~ '" ~---4.4-~ ~~-~.~-~.-~4.--~-~-..~,--~-~-~.-~-~..~-~--~.-.~ ....... ~.~.4-.~-~..~-~-~.-~ ....... ~..-~...~..~---~-~...~-~--.~ .... ~..~-..~,-~--~..~-~--.~---~ ..... ~-~..~-~--.4-~..; .... ..-~--~-~,-~.--~M-.~~-~+.+-?~-~-~--+-+.-,--+-.~-~-~--?-?-?-~ ....... ??,.-.?~.--?-.?--~ ....... ~--~-.?-~-.,~..?,.--~.-.~ ...... ~"-?-?H'-'?-?: ....... ~'-~-"~-~---~-~-~'--~-' 12000 2:~8. PROJECTION ON VERTICAL PLANE 2Et8. - S8. SCALEO IN VERTICAL DEPTHS HORIZ SCALE = 1/2000 IN/FT ,r TELECO 1 Teleco Oilfield Se, s of Alaska Inc. / 61 16 Nielson Way  Anchorage, AK 99502 (907) 562-2646 March 19, 1990 JOB ~747 BP EXPLORATION (ALASKA) INC. WELL: Y-27 PRUDHOE BAY RIG: NABORS 18E Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Field Operations Supervisor JGM/el Enclosures IC OI:ILMED A .~¢~,4~1~T COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 3/19/90 Company: BP EXPLORATION Well: Y-27 Location: PRUDHOE BAY Rig: NABORS 18E TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 747TAK 0.0° 30.0° 30.0° 238.9° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* TIE IN TO SPERRY SUN GYRO SINGLE SHOT 814 0 9.8 251.0 812.07 30.68 14.14S 27.30W 30.74 S 62.62W 0.00 TELECO MWD SURVEYS 905 91 11.3 243.8 901.54 47.10 20.58S 42.59W 47.30 S 64.20W 2.23 997 92 11.8 243.4 '991.68 65.45 28.78S 59.09W 65.72 S 64.03W 0.55 1088 91 12.0 242.0 1080.72 84.18 37.39S 75.77W 84.49 S 63.74W 0.39 1178 90 12.9 244.8 1168.60 103.53 46.06S 93.13W 103.89 S 63.68W 1.19 PAGE 1 Company: BP EXPLORATION, Well: Y-27, Location: PRUDIIOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 1269 91 15.4 240.2 1256.84 125.71 56.39S 112.80W 126.11 S 63.44W 3.01 1359 90 15.4 243.0 1343.61 149.58 67.75S 133.82W 150.00 S 63.15W 0.83 1452 93 15.4 237.4 1433.27 174.24 80.01S 155.23W 174.64 S 62.73W 1.60 1548 96 15.2 235.3 1525.87 199.55 94.04S 176.32W 199.83 S 61.93W 0.61 1644 96 14.8 234.3 1618.60 224.33 108.36S 196.62W 224.50 S 61.14W 0.50 1739 95 15.3 231.8 1710.34 248.86 123.19S 216.32W 248.94 S 60.34W 0.86 1833 94 17.0 231.8 1800.63 274.82 139.37S 236.88W 274.83 S 59.53W 1.82 1928 95 18.5 233.9 1891.10 303.62 156.84S 259.98W 303.62 S 58.90W 1.71 2023 95 19.4 231.4 1980.95 334.28 175.57S 284.49W 334.30 S 58.32W 1.28 2116 93 20.7 231.8 2068.31 365.91 195.37S 309.48W 365.98 S 57.74W 1.41 2211 95 22.7 235.0 2156.58 400.87 216.26S 337.69W 401.01 S 57.36W 2.45 2305 94 23.6 232.9 2243.01 437.68 238.02S 367.56W 437.89 S 57.07W 1.30 2442 137 26.8 231.1 2366.96 495.57 273.96S 413.48W 496.01 S 56.47W 2.40 2537 95 30.8 232.1 2450.19 540.96 302.36S 449.35W 541.61 S 56.06W 4.24 PAGE 2 ComDanv: BP EX~,LORATION,, Well: Y-27, Location: ,,PRUDHOE BAY,,,,Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100° 2631 94 36.1 231.8 2528.59 592.37 334.30S 490.14W 593.29 S 55.70W 5.64 2726 95 40.5 233.5 2603.13 65Q.89 369.97S 536.95W 652.07 S 55.43W 4.76 2821 95 44.2 233.9 2673.33 714.62 407.85S 588.52W 716.03 S 55.28W 3.91 2920 99 48.7 232.5 2741.52 785.99 450.84S 645.94W 787.72 S 55.09W 4.66 3014 94 51.0 231.1 2802.12 857.29 495.28s 702.39W 859.45 S 54.81w 2.71 3108 94 53.4 231.8 2859.73 930.94 541.56s 760.49W 933.61 S 54.54W 2.61 3200 92 53.5 231.8 2914.51 1004.28 587.27s 818.57W 1007.44 S 54.34W 0.11 3294 94 53.2 231.1 2970.63 1079.06 634.27S 877.55W 1082.77 S 54.14W 0.68 3389 95 52.6 231.8 3027.93 1154.20 681.49s 936.80W 1158.46 S 53.97W 0.86 3485 96 52.3 231.8 3086.44 1229.73 728.55s 996.61W 1234.52 S 53.83W 0.31 3578 93 52.1 231.8 3143.44 1302.65 774.00s 1054.36W 1307.96 S 53.72W 0.21 3673 95 51.8 232.6 3201.99 1376.95 819.85s 1113.47W 1382.74 S 53.64W 0.73 3767 94 51.6 231.7 3260.25 1450.21 865.11s 1171.72W 1456.48 S 53.56W 0.78 PAGE 3 Company: BP EXPLORATION, Well: Y-27, Location: PRUDttOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100° 3861 94 51.4 232.7 3318.77 1523.29 910.20S 1229.85W 1530.03 S 53.50W 0.86 3955 94 51.3 232.5 3377.48 1596.25 954.79S 1288.17W 1603.43 S 53.45W 0.20 4054 99 51.2 232.7 3439.45 1672.99 1001.68S 1349.50W 1680.63 S 53.41W 0.19 4148 94 50.8 232.5 3498.60 1745.61 1046.05S 1407.53W 1753.68 S 53.38W 0.46 4243 95 50.5 232.5 3558.84 1818.61 1090.77S 1465.82W 1827.13 S 53.35W 0.32 · 4339 96 50.3 232.1 3620.03 1892.10 1136.01S 1524.34W 1901.09 S 53.30W 0.38 4434 95 50.3 232.9 3680.71 1964.73 1180.50S 1582.33W 1974.17 S 53.28W 0.65 4532 98 50.0 231.8 3743.50 2039.49 1226.46S 1641.90W 2049.40 S 53.24W 0.91 4626 94 51.1 231.8 3803.22 2111.52 1271.35S 1698.95W 2121.97 S 53.19W 1.16 4718 92 52.9 231.6 3859.86 2183.45 1316.28S 1755.84W 2194.44 S 53.14W 1.96 4782 64 54.2 231.5 3897.89 2234.51 1348.29S 1796.15W 2245.90 S 53.11W 2.04 4875 93 55.2 231.8 3951.63 2309.80 1395.39S 1855.68W 2321.78 S 53.06W 1.11 4970 95 55.5 231.8 4005.64 2387.36 1443.72S 1917.09W 2399.91 S 53.02W 0.32 PAGE 4 Company: BP EXPLORATION, Well: Y-27, Location: PRUDItOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 5065 95 55.3 231.4 4059.59 2464.93 1492.29S 1978.38W 2478.08 S 52.97W 0.41 5160 95 54.5 233.0 4114.21 2542.12 1539.92S 2039.79W 2555.79 S 52.95W 1.62 5256 96 54.7 232.9 4169.82 2619.95 1587.06S 2102.25W 2634.05 S 52.95W 0.23 5351 95 54.2 233.2 4225.06 2696.84 1633.53S 2164.01W 2711.34 S 52.95W 0.59 5444 93 54.2 233.2 4279.46 2771.90 1678.71S 2224.41W 2786.77 S 52.96W 0.00 5538 94 54.2 233.6 4334.45 2847.79 1724.17S 2285.62W 2863.01 S 52.97W 0.35 5632 94 54.1 233.5 4389.50 2923.66 1769.43S 2346.91W 2939.19 S 52.99W 0.14 5728 96 55.2 234.3 4445.04 3001.66 1815.56S 2410.17W 3017.48 S 53.01W 1.33 5822 94 55.7 234.4 4498.35 3078.84 1860.69S 2473.08W 3094.88 S 53.04W 0.54 5917 95 55.6 235.0 4551.95 3157.06 1906.00S 2537.10W 3173.28 S 53.08W 0.54 6006 89 56.4 235.3 4601.72 3230.69 1948.16S 2597.65W 3247.02 S 53.13W 0.94 6100 94 57.3 235.3 4653.12 3309.24 1992.96S 2662.36W 3325.66 S 53.18W 0.96 6194 94 58.3 235.7 4703.21 3388.64 2038.01S 2727.91W 3405.14 S 53.24W 1.12 PAGE 5 Company..' BP EXPLO.RATION, Well: Y-27, Location: PRUDHOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 6288 94 58.4 236.7 4752.54 3468.5'7 2082.53S 2794.40W 3485.06 S 53.30W 0.91 6383 95 58.5 237.8 4802.25 3549.49 2126.32S 2862.49W 3565.82 S 53.39W 0.99 6475 92 58.2 239.9 4850.53 3627.80 2166.83S 2929.51W 3643.79 S 53.51W 1.97 6571 96 57.8 239.9 4901.40 3709.20 2207.66S 2999.94W 3724.70 S 53.65W 0.42 6667 96 57.7 240.8 4952.63 3790.36 2247.82S 3070.50W 3805.35 S 53.79W 0.80 6760 93 56.6 239.9 5003.07 3868.46 2286.47s 3138.40W 3882.97 S 53.92W 1.44 6855 95 56.5 239.7 5055.44 3947.72 2326.34S 3206.90W 3961.83 S 54.04W 0.21 6950 95 56.2 240.3 5108.08 4026.78 2365.88S 3275.39W 4040.49 S 54.16W 0.61 7044 94 56.3 240.5 5160.30 4104.91 2404.49S 3343.35W 4118.20 S 54.28W 0.21 7140 96 55.6 240.2 5214.06 4184.43 2443.84S 3412.47W 4197.30 S 54.39W 0.77 7234 94 55.4 240.3 5267.30 4261.87 2482.28S 3479.73W 4274.37 S 54.50W 0.23 7329 95 54.9 240.2 5321.58 4339.81 2520.96S 3547.42W 4351.94 S 54.60W 0.53 7422 93 54.3 240.0 5375.46 4415.60 2558.75S 3613.14W 4427.41 S 54.69W 0.67 PAGE 6 Company: BP EXPLORATION, Well: Y-27, Location: PRUDHOE BAY, Rig: NABORS 18E ]..al Coordinates Closure Dog Leg Meas Course True Vert"c ' Depth Length Incl Azi Vert. Dp. SectJ. on N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 7517 95 53.9 239.5 5431.16 4492.55 2597.51S 3679.62W 4504.07 S 54.78W 0.60 7612 95 54.0 239.6 5487.06 4569.35 2636.43S 3745.83W 4580.62 S 54.86W 0.14 7706 94 53.5 239.2 5542.64 4645.16 2675.02S 3811.09W 4656.19 S 54.93W 0.64 7800 94 53.2 239.1 5598.75 4720.5'7 2713.70S 3875.83W 4731.41 S 55.00W 0.33 7895 95 52.7 239.0 5655.99 4796.40 2752.68S 3940.86W 4807.04 S 55.07W 0.53 7990 95 52.6 239.0 5713.62 4871.91 2791.57S 4005.60W 4882.38 S 55.13W 0.11 8084 94 53.2 240.2 5770.32 4946.88 2829.50S 4070.27W 4957.13 S 55.19W 1.19 8180 96 53.5 239.9 5827.63 5023.88 2867.95S 4137.00W 5033.88 S 55.27W 0.40 8274 94 53.3 239.2 5883.67 5099.34 2906.19S 4202.06W 5109.13 S 55.33W 0.63 8369 95 53.1 239.2 5940.58 5175.41 2945.14S 4267.40W 5185.03 S 55.39W 0.21 8463 94 52.7 238.8 5997.28 5250.38 2983.76S 4331.66W 5259.86 S 55.44W 0.54 8558 95 52.6 238.5 6054.92 5325.90 3023.05S 4396.16W 5335.26 S 55.49W 0.27 8652 94 52.4 238.2 6112.14 5400.47 3062.18S 4459.64W 5409.75 S 55.52W 0.33 PAGE 7 Compan¥~ BP EXPLQRATION, Well: Y-27, Location: PRUDHOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg~ deg feet feet feet feet feet deg deg/100' 8748 96 52.5 238.5 6170.65 5476.58 3102.12S 4524.43W 5485.77 S 55.56W 0.27 8843 95 52.0 238.1 6228.80 5551.70 3141.59S 4588.35W 5560.80 S 55.60W 0.61 8975 132 51.4 237.9 6310.61 5655.28 3196.49S 4676.20W 5664.31 S 55.64W 0.48 9070 95 50.8 238.1 6370.26 5729.21 3235.66S 4738.90W 5738.18 S 55.68W 0.65 9165 95 50.1 238.1 6430.75 5802.45 3274.37S 4801.09W 5811.37 S 55.71W 0.74 9260 95 49.9 237.8 6491.82 5875.21 3312.99S 4862.77W 5884.08 S 55.73W 0.32 9355 95 49.6 237.8 6553.20 5947.71 3351.63S 4924.13W 5956.55 S 55.76W 0.32 9449 94 49.3 237.8 6614.31 6019.12 3389.69S 4984.56W 6027.92 S 55.78W 0.32 9544 95 49.2 237.4 6676.32 6091.07 3428.25S 5045.33W 6099.86 S 55.80W 0.34 9638 94 49.0 237.1 6737.86 6162.10 3466.69S 5105.09W 6170.89 S 55.82W 0.31 9733 95 48.8 237.1 6800.31 6233.66 3505.58S 5165.20W 6242.47 S 55.84W 0.22 9861 128 48.8 236.4 6884.62 6329.90 3558.38S 5245.74W 6338.76 S 55.85W 0.41 9956 95 48.9 236.6 6947.13 6401.37 3597.87S 5305.39W 6410.29 S 55.86W 0.19 PAGE 8 .... Company: BP EXPLORATION, W.ell: Y-27,.Location: PRUDHOE. BAy., .... Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 10050 94 48.7 237.5 7009.05 6472.06 3636.33S 5364.74W 6481.00 S 55.87W 0.75 10143 93 48.4 238.0 7070.61 6541.75 3673.53S 5423.70W 6550.67 S 55.89W 0.52 10237 94 48.3 238.5 7133.08 6611.98 3710.48S 5483.43W 6620.85 S 55.91W 0.40 10333 96 48.3 238.5 7196.95 6683.66 3747.93S 5544.54W 6692.45 S 55.94W 0.00 10427 94 48.0 239.1 7259.66 6753.69 3784.21S 5604.44W 6762.39 S 55.97W 0.57 10522 95 47.7 239.2 7323.40 6824.12 3820.33S 5664.91W 6832.72 S 56.00W 0.34 10685 163 47.5 238.9 7433.31 6944.49 3882.23S 5768.14W 6952.92 S 56.06W 0.18 10780 95 48.1 240.1 7497.13 7014.86 3917.95S 5828.78W 7023.17 S 56.09W 1.13 10875 95 49.3 241.6 7559.83 7086.18 3952.70S 5891.11W 7094.29 S 56.14W 1.73 10969 94 51.5 242.0 7619.74 7158.51 3986.91S 5954.94W 7166.37 S 56.20W 2.36 11057 88 53.1 242.6 7673.56 7228.01 4019.27S 6016.59W 7235.60 S 56.26W 1.89 11151 94 53.2 243.4 7729.93 7303.04 4053.42S 6083.61W 7310.30 S 56.33W 0.69 11246 95 53.3 243.4 7786.77 7378.92 4087.50S 6151.67W 7385.85 S 56.40W 0.11 PAGE 9 Company.' BP EXPLORATION, Well: Y-27, Location: PRUDHOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 11341 95 53.4 243.4 7843.48 7454.90 4121.63S 6219.82W 7461.50 S 56.47W 0.11 11436 95 53.4 243.0 7900.12 7530.95 4156.01S 6287.90W 7537.25 S 56.54W 0.33 11531 95 53.7 243.6 7956.56 7607.14 4190.34S 6356.17W 7613.14 S 56.60W 0.59 11626 95 53.7 245.1 8012.81 7683.35 4223.48S 6425.19W 7689.01 S 56.68W 1.27 11721 95 54.0 244.5 8068.84 7759.66 4256.14S 6494.60W 7764.96 S 56.76W 0.61 11816 95 53.3 244.5 8125.14 7835.80 4289.09S 6563.67W 7840.79 S 56.84W 0.75 11911 95 53.0 244.3 8182.11 7911.48 4321.93S 6632.23W 7916.16 S 56.91W 0.35 12003 92 52.1 245.3 8238.04 7984.12 4353.04S 6698.31W 7988.51 S 56.98W 1.31 12098 95 51.2 245.2 8296.99 8058.17 4384.23S 6765.97W 8062.25 S 57.06W 0.95 12192 94 50.2 245.3 8356.52 8130.46 4414.68S 6832.03W 8134.25 S 57.13W 1.07 12287 95 49.6 246.6 8417.72 8202.57 4444.30S 6898.39W 8206.06 S 57.21W 1.22 12382 95 49.2 246.4 8479.54 8274.07 4473.06S 6964.53W 8277.26 S 57.29W 0.45 12477 95 49.0 246.5 8541.73 8345.25 4501.75S 7030.36W 8348.16 S 57.37W 0.21 PAGE 10 ComDanv: BP EXPLORATION, Well: Y-27, Location: PRUDtIOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100° 12572 95 49.0 247.1 8604.05 8416.28 4530.00S 7096.27W 8418.91 S 57.45W 0.48 12666 94 48.7 249.3 8665.90 8486.12 4556.29S 7161.99W 8488.45 S 57.54W 1.79 12762 96 48.4 250.7 8729.45 8556.72 4580.90S 7229.60W 8558.72 S 57.64W 1.14 12856 94 48.4 251.0 8791.86 8625.49 4603.95S 7296.01W 8627.17 S 57.75W 0.25 12883 27 48.5 252.2 8809.77 8645.19 4610.33S 7315.18W 8646.79 S 57.78W 3.32 PAGE 11 TEnnECO Oi 1 fie ld PLAN VIEW Servic BP EXPLORATZON Y-27 PRUDHOE BAY NABORS iSE JOB# 747TAK/O0 SCALE: i inch = 1600 12883 + B44B + 10237 + li~5~ 6950 7800 ' + 2631 3389 4054 ' + 4782 ' 5444 ' + 6194 ' 1600 3200 4800 6400 8000 95OO 't 1200 12800 9600 8000 6400 4800 3200 1600 WEST (ft) TE -ECO O lf eld Serv ce , Vr--RTICAL PROJECTION 0 2000 4000 6000 8000 ~0000 12000 2000 4OOO .~6000 8ooo iO000 !2000 '14000 i6000 1BO00 8~4 ' 9.75 Oeg ~2S9' ~5.4 deg BP EXPLORATION ~739 · ~5.~ u~g Y-27 PRUDHOE BAY %22~ ' 22.7 deg ~2e · 40.5 u.g NABORS 1BE ' d.g JOB# 747TAK/O0 ~3389 52.6 %~o54 · 5~.2 aeg SCALE: ~!a ' 52.9 u~g ~ inch = 2000 feet :~44 ' 54.2 aeg 50 ' 56.2 deg ~OB'53.5deg ~x~63 ' 52.7 deg ~xx~65 ' 50.i deg 6~ ' 48.8 aeg ~x~O522 ' 47.7 aeg ~x~,5' ' 53-2 deg D~ ' 53.0J deg deg aeg VERTICAL SECTION (ft) BP EXPLORATION PAD Y (~-5-10-13) Controlled LES HENDERSON (907) 333-1552 Drilling Consultants, Inc. CONI ROLLED DRILLING CONSULTANTS, INC. P.O. Box 190560 Anchorage, Alaska 99519-0560 (907) 333-1552 March 16,1990 Mr. Brian Rose BP Exploration Pouch 196612 Anchorage, Ak. 99519-6612 RE: Magnetic Single Shot Survey Job No.A-0290-025 Well: Y-27 (31-5-10-13) Prudhoe Bay Field North Slope, Alaska Date of Survey: 2-25-90 to 3-16-90 Dear Mr. Rose: Please find enclosed the "Original" and four ( 4+ copies of our Magnetic Single Shot Survey on the above well. The method used in calculating this survey was Radius of Curvature. The depth of the survey was 453, to 12,856'. Thank you for giving us this opportunity to be of service. Yours very truly, Controlled Drilling Consultants, Inc. Directional Supervisor HORIZONTAL VIEW BP EXPLORATION WELL Y-27 (31-5-10-1:~) RADIUS OF CURVATURE MAGNETIC SINGLE SHOT SCALE: I"= I000' MARCH 19, 1990 TVD = 8,787' TMD = 12~56' ALL DEPTHS SHOWN ARE TVD ) 8P EXPLOR~ liON MAGNETIC SINGLE '-'-' oHOT SURVEY RADIUS OF OURV~TURE MKTNOD OF COHPUTATZOH 'ENGINEER-' C. Iii . HARRINGTON ...... CO'MPUTED---FOR CDC BY OC~HNTE~H TRUE MEAS'; DRIFT VERTICAL OEPTH ANGLE 2023'19'24 211620'42 22ii 22 42 DEPTH "A~S'SUNED VERTICAL TO 0 0 0 ,00 ~'~ 0 i5 453,00 544' 2 45 54 633 5 45 ~32 723 7 3'0 722,10 8i4 9 45 9i2,07 905 ii ie 90i,53 997 i'I ~S 99i,67 i088 i2 0 i080. 178 i359 iS 24 i343,60 '1452 548 i'5 12 i525,85 1739 i5 18 1710,32 928 18 30 189i,09 i980,94 2068,30 2)56.56 .SEA 0 FT, -80,26 372,74 493,70 552,45 64i, 84 73i ,8i 82I ,27 9ii ,4i O0 O, 45 08@, 34 i 76.57 263,34 445.59 53S, 32 ~ 72 0 , 35 JSi 0,83 )900,68 988.04 2076.30 REuORu OF SURVEY DRIFT D!REC DEG, TOTAL COORDINRTES N , OOE $65, OOE S64.00~ S73.,OOW S62,00W 97i.00W 963.80W $63,40Y 962,00W S64 80W S6 0 ~OW $~300W S57 ~ 30W S54 30W S51 80W S51 80~ @53 SSi 955 00~ .o0 S ,42 8 2.33 S 4.74 8 i4. i4 S 20.53 ~ ~_u. 72 S · 37,33 S 46, Oi S 56 28 S 67 65 S 79 92 $ 93 95 S i08 27 $ 123 10 S !39 27 S i 56 76 S i75 47 S ~95,28 S · :-:i~. :-.'~ S JO9 NO R-0290-025 YELL ¥-27 KS ELEV 80.26 FT, SURVEY DRTE' 02/25790 ........... PROPOSED DIR $58-53~ ...... .00 .90 .9i 5,22 14.80 27,30 42 63 59 i3 75 8i 93 i5 ii2 88 i~3 90 176 41 ~96 7i 216 42 236 97 260 05 284 57 309.56 337.76 CLOSURES DISTANCE RHG'LE SEVERi'f¥ DEG'/t'OOFT S . O0 S 9'0 0 O' W · 99 S 65 0 2,50 S 2i 2.4 2i E 7,OS S '47 43 i7.i7 S 59 3i 0 W 30.74 S 62 36 25 W 47,32 S 65.74 8 64 5 42 W 84,50 S 63 47 7 W i03,90 $ 63 42 126,13 S 63 ~9 5~ W !74.68 8 62 46 24 W t99,87 240,98 S 60 22 8 W 274,86 S 59 303,65 S 5S 55 7 W 334,33 S 58 20 29 366,01 ~ ~r 45 i9 W 40i , ~2 ' . ,055 2.7'67 .3 ;'372 --i, 2, 'i. ,544 ,2.30 i ,0i2 2,770 .926 i, ,257 .422 .557 i ,6'09 i, 595 .-99i i. 399 0 O' 17. 47. 65, i OS, 53 i49, ~-74 . 27 ~99, 224,36 274. 302;, 65 S55,94 SOHIO WELL Y.-27 TRUE iiEAs'; DRIFT 'VERTiCAL DEPTH ANGLE DEPTH 2442 26' 48 2~66,94 2537"30'- 48 2450, i 26~i ~ ~ 2528,57 ..... 2726 40 ~0 2~0~. :282'i 44 i2 2~7~,~ 2920 48 42 274i,50 ~-'014" 51 0 28 02, i ~ i'-08 53'24 2859. ~294 5~ i2 2970. 4i48 50 48 ~498, 44~4 '50 .....I8 ~680. 4718"52'54 3856, 50~5 5~'18 4060, S44'4 12 4278.9 5728 ~ .... 1'2 444~,0 6i00 57 i8 4649 638~ 0 4800,05 6760 56 36 5082,33 7i40 55 3'6 52i4.27 7422 54 i8 5376.2i 77 06 53 30 5543,55 8084 5.3 12 5769,18 8369 5:3 6 5940,I0 S748 52 30 6169,25 9070 50 48 6369,03 SUB 2162,73 2286,/,8 2369,9i 2448,3 i 2522,85 259~, 04 266 i , 24 272 i, 94 2779,45 289 0, G i ~062.91 3238, I I 34 i 8,33 3600. 06 3776,45 3979.9 0 4 i 98,64 4362,75 4569,4 i 4719,79 4922, 07 5i34, Oi 5295,95 5463,29 56e8,92 5859,84 6088,99 ~" SINGLE REuDRD DRIFT OtREC S52 9 OW o~ i i OW S52 i OW obi 80W 953 5 OW $53 <... ,~ 5Oi, I SSi i OW SSi 80W 952.1 OW $51 8OW S52 70W S52 5 OW 952 4 S5i S51 4OW S53 2 OW 954,30W 955. ~,~7.80W S59,90W 960,20i~ SSO, OOW S59,20W S6 0,2 OW S59,20W ~ -~i~ S55. SURVEY OF SURVEY TOTAL 237.9G S z,,. 3,87 :B 334.2i S 369 93 '~ 407,81 S ~,.8 7eS 49= 54i 49 S ~ 48 S ,. 7~ 55 $ 908 ~i S i044 27 S i 178 86 S !Si5 88 S 1490,85 S 1680 ll '~ 995,44 S 2i27,57 S 2292, ~ 2 9 2449,58 S 2564,66 S 268 8,78 S 285~, 78 S 2948,84 S ~i 05, O0 S ._,~7 69 S JO8 NO A 0~90-025 COMPUTER- 19 NAR 90 K8 ELEV °O 2~ FY COORDINATES 367.63 W 413,59 W 449,45 W 490.24 W 537,03 W 588,6 0 W 646,04 W 702,49 W 760,58 W 878.0i W !055.79 W I231.52 W t408.95 W i584.84 W 1759.41W !979,38 W 2224,25 W 24i1,17 W 2663,90 W 2863,90 W 313G,14 W 3409.42 W 3609 55 W 3807 47 W 4069 3I W 4266 21 ~ 4524 56 W 4739 4; W DOG LE6 ..... C L 0 S U R E S SEVERITY SECTION' DISTANCE ANGLE DEG/tOOFT OISTA~CE' 437,'93 S 57 '5 496,05'S 5'6'29 541,65 S 56 4 593,32 $ '55 42 652.il S 55 26 7t6.07 $ 55 787.7'6 S '5'5 859,49 $ 54 49 9~3.64 S 54 33 i082.64 8 54 1308,26 S 53 48 1530,43 S 53 34 i753,75 S ~.J 1974.57 S 53 2197,06 S 53 2478.0t S 53 2787.48 S 52 30i9,24 S 52 3328.38 s 5~ 3567,70 s 5~ 3884,4e s 53 4i98,i7 S 54 4427 9i S 54 4656 54 S 54 4958 79 S 55 5186 16 S 55 5487 5739 54i.80' 592,42 650,9~' ¢!4,66 607 ' 2,598 i 49 393 3i5 933 693 438 7 '7 O 463 227 857. 930.98' I 079, 02 i 523.89 ! 745 ;90 ~ 965..35- 2 ! 86, SO 2465, 03 3003 355~ 4i84.79' 44~5.5'; 4645, 04 4949.27 ~OHIO WELL T~UE H~,Rs,-[~R-tFT VERTICAL SUB DEPTH ANGLE DEPTH ~EA 9449 49 18 66t2,38 6532,~2 9733 4e"~'48 8798,52 671 e, 26 iOOSO 48-'42 7007,5~ ~927,27 10780 48 6 7494,t8 74i3,92 ii~i 53--2'4' 7839'97 ii721 5'4 O 8064,e3 I2003 52 6 e2S4,~4 e154,08 i2572 49 O 8599,47 85i9,2i THE FOLLOWING IS EXTRAPOLATED 12856 4~ 24 8786,91 8706,65 BOTTOM HOLE CLOSURE SINGLE SHOT SURVEY REU~RD OF SURVEY DRIFT TOTAL ,~...t 86 $ $57,i0W 3507,27 S 858,50ij 37i0,25 9 959, i OW 37e~, 56 S S60,i08 39i6,4i S 962,6Obi 4019,00 9 ooJ,4OW 4i22,3i $ 964,50W 4256.79 9 965,30W 4F52.39 $ $66,60W 4442.i4 S ~e~,iO~ 4527,08 S TO TD JOB NO COORDINATES 4905,66 5367.02 54e5,79 5833 29 ~02I 06 6223 81 6498 94 ~904 i 2 7i 02 79 A-0290-025 CuHP~TER 19 MAR 90 KB ELEV 90.2E. SFi,OOkl 4603,35 S 7302,00 W FEET ~T S 57 46 i8 ~ CLOSURES DISTANCE ANGLE D f'i 6030.05 S 55 46 t7 W 6244,46 S 55 49 45 W &482,72 S 55 52 59 Y 6622,68 $ 55 55 4I W 6764.03 S 55 59 i7 W 7026.06 S 5~ 7 22 W 225 ---- 367 66!~,99 '2~5 67~5,42 159 70i7,93 7239.i6 S 56 I'~ 7465,20 $ 56 28 7768,95 S 56 4~ 7992,i0 S 57 0 8209.7i S 57 i4 8422,8~ S 57 29 38 W 1895 54 W 210 3i W 247 I2 W 697 33 ~ '9i'9 i6 W .233 7458. 7997.82 ,796 86~ o, 3 t' ) SOHIO WELL Y-27 MEASURED DEPTH TRUE DEPTH DEPTH i-'80 ' t 80, 28'O 28 0, ;3:80 480 480, 5-80 58 0, 6,81' ~,8 782 883 880, ~85 g8 1 08~ ~ 08 O, 1190 1180, i ~97 I ~8 O, i'S'01 148 0 . J604 1580. 1708 $680. ~8~2 1780, 191'7 t 88 O, 2 022 198 2129 ~080. 2237 2 i 80. 2346 2280, 2457 238 O, 2572 248 0, 2696 2580, 283~ 2680, 298~ 2780, 3I 42 2~8 6, 331 0 298 O, 3475 30~0, 3638 318 0, 3800 328O, 3968 3380, 4 i i 9 348 0. SINGLE '> ::~HVT SURVEY JOB NO R-0290-025 CONPUTER- I9 NAR ,.,B ELEV ~v,26 DATA FOR EVERY EVEN I O0 FEET OF SUB SEA DEPTH, . 9O SUB MD-TVD VERTICAL SEA DIFFERENCE CORREC. TI ON 'TOTAL COORDINATES -.80 0 0 100 0 0 200 0 0 308 0 O 400 0 0 5OO 0 0 600 0 0 7O0 i i 800 3 2 900 5 2 iOOO 7 2 i100 9 2 )200 i3 4 1300 i6 I400 20 4 )500 24 4 I600 27 1700 31 4 1800 36 5 1900 42 6 2000 48 6 2100 56 8 2200 65 9 2300 76 ii 2400 92 2500 ii6 24 2600 i50 34 2700 i99 49 2900 262 63 2900 329 67 Jvuu 394 3100 458 64 3200 5i9 6I 3300 579 60 3400 g78 59 ,00 S ,OO {,.1 ,ii N ,11 E ,i2 N .36 E . 08 S ,69 E ,62 S 1,i0 E :3,20 $ i,04' td ........ i2,27 i8,76 27,6~, '37,28 47,i8 59.45 72,41 86,97 i 02,36 1t.9, 09 135,47 154,63 175,32 198,08 22 i , 98 248,07 278. i 5 3i3,77 358,52 4!1 .83 478,62 559.54 641 1i 722 28 801 88 879 54 ! 03 0 ~8 22,4i 38;'86 7'~ ,' 72' 95,60 i i 8,5;0 t42,80 td !-66.'i'2 td i 88.42 2'09,96 'w 232. 257. 284.39 313, 7~5.9 0 38 0.97 ~64.i7 52i ,79 t,J 594, 68 J, 74 782,27 887,9i 99 i , 79 097, ~ 9 W 292.94 i39!.i0 SOHIO WELL Y-27 SINGLE SHOT SURVEY jO8 HO ' MEABURED DEPTH AND OTHER DATA FOR EVERY EVEN MEASURE DEC TH , 4-2'77 45'93 475? 4926 5 oo 52?4 5446 56-~i9 57~4 59'7~ G90i 7080 7429 7~99 7g~5 8102 82~g ~436 8 G 0 } 8928 9088 92'~5 9557 9705 9~57 i 0009 TRUE VERTICAL SUB MD-TVD DEPTH ~-~ ~E~ DIFFERENCE 3580. 3500 3680, 3600 ?53 3?80, 3700 3880. 3800 876 398G , 3900 946 4080, 4000 4~80. 4i O0 ~ 0~4 4280, 4200 t i 66 4~80, 4~00 ~ 2~8 4480. 4400 4580, 4500 J 392 468e, 4~00 i 47~ 4780, 470~ i564 4880, 4800 4980, 4900 i 739 5080, 5000 i820 5i80, 5i O0 J899 52~0, 5200 i975 5~0. 5~00 204~ 5480, 5400 2i i8 5550, 5.500 5680, 5600 2255 5780, 5700 2322 5880, 5800 2389 5980, 5900 2455 6080, 6000 2521 6i80, 6~ O0 2585 6280. 6200 2648 6380 6300 6480. 6400 2764 6580, 6500 28~9 6680. GGO0 2872 6780, 6700 292~ 6980, 6800 6980, 6900 3028 FEET OF ,.UB SEA VERTiCRL"'" ' CORRECTION TOTAL 58 57 ~4 70 75 72 72 75 79 84 ~8 90 85 76 73 70 67 64 ~3 59 57 55 53 53 52 DEPTH COORDINATES . 1105,02 1 I78,82 ~ 254'.. 64 1335,32 1420.20 J508,88 i 596.68 J68i .25 i 764.58 ]848,58 ~ 934.46 2 022,52 2110,3'3 2i95,49 2275.2~ 235 O, SS 2424,8i 2497.06 2567,45 2636,94 2706, I 0 2774,23 284~ , I4 2908, 1 ~ 2976,2~ ~ 044, ~9 3112,,49 ~179,55 3244, ~6 g309,02 3~71,91 S433,93 3495,94 3557,82 36i9,32 COMPUTER-- i9 ¢:iAR 90 1488.05' W " 890 ;75 W 2002.04 W 2225.78 "~ 04 2576,4~ 2703,37~ 2836.72 3237,74 ...7,492 ,. 2 0 W 7737,49 W ~850, 09 t:i 3966, J4 t:.i 4082,14 W 4197.5;~ W 43 i 2,07 tJ 4425. ! ~ Y 4536. ?8 tJ 48,45,6~ W 47'51 ,08 bJ 485.3,70 hi 4953,94 tJ 5 052, ! 3 W 5!49:93 W 5244, S?. W 5.740,82 tJ SOHIO NELL Y-27 SINGLE Si-iO T '~ ~.-~LIRVEY MEASURED DEPTH AND OTHER DATA FOR EVERY EYEN TP, UE MEASUREr) VERTI.,.AL SUB HO TVD ~E-P'TH DEPTH SEA DIFFERENCE 7489. 7580, 7789, 7880, 798 03:]0 04-60 06-I'0 0759 ' 09i2 I 0'74 i124I i1409 i 578 1 747 0 i914 8180. l 2'077 828 6. 2390 8480, 2543 858 2695 e6e O. I2846 878 O, 2856 8787, 7000 3079 7408 3i30 7200 3i79 7309 3229 7400 3278 7500 33~i 7~00 3393 77¢0 34~0 7800 ~528 7900 3597 8iQ0 3734 8200 3796 8300 3855 8408 ~909 8500 3962 8600 4014 8700 4065 8707 4069 JO@ NO A-0290-025 FEET OF SUB SEA OEP'TH, VERTICAL CORRECTIOH TOTAL 49 50 49 62 67 69 69 68 62 59 54 53 52 Si 4 COORDINATES COMPUTER- !9 ~AR '30 K8 ELEV 80.26 Fi', · ~679.97 S 3738.72 S · ~796. i 4 S 3852,7i S 3908,68 S 3965,4 i S 4025.34 S 4 086.26 S 4 i 46,62 S 4206.5i S 4265.90 S 4322., 92 $ 4~76.6 O S 4426.38 S 4473, O0 S 4518.46 S 456i, 82 S 4600.89 S 4603 o,. S 543~, '78 55~2,48 5627,90 5723,59 W 58i9.8~ W 5920,65 W 6033,:.~0 W 6394.50 W 65 ~ 8,06 w 6756,06 W 6867,88 W 70~2.4i N 7~ $8,52 ij 7294,87 W 7302. O0 lj ~OHIO gELL Y-27 ..... INTERP'O'f2 ~'i'TED VI%L U ES F 0 R EVE ii, TRUE MEASURED VERT I CAL · D~TH 1000 ~OOO 3000 4 O00 ~000 , ~'000 ?000 ~ 000 · 9 O0 0 i'O000 I ~ 000 DEPTH ~ 995. l 9S9. 34 40~3, 459S, 51~6, 5719, ~975, 8787. ~!N~LE SHOT ~URVEY JO8 NO ~0-025 FEET OF f~E~:~URE~ DEPTH CONP-rJTER-. !9 rq~R 90 KB ELEV E~0.26 FT. SUB SEA TOTAL COORDii4ATES -80, . O0 S , O0 9i4, 28.99 S 59.68 '1879, 170,77 $ 278,6I 2.7123, 488.4i S 694,03 3325, 974,2~@ $ 1~17,70 ~943 i457 6I ¢' 93 , , , ~ t 771~ 45i5, ~947,52 S 2595,05 5055, 2~9i .95 9 ~09.02 5639, 2~00.2J $ 40 6245, ~208.98 S 469~.21 6894, 36i5.8~ S 5~5, 7555, ~997,96 9 8i52, 4~5i.40 S 8707, 4603,35 COMPLETION DATE _ ~ I, "'~ ~' i ~,o CO. CONq"ACT ~/~P/~ AOGC~: 'GEOLOGICAL MATERI~LS INVENI"0R¥ LIST ..... ..... ( check off or list data as it is received ~ 40'~ ! ~,,/~//~ ~, drilling hist.* "~ su~e~, I ~' '~ell tests ~ l, c~re' desription I~ cored [nte~al~ .... c?re ~n~Jysis ~ ~,d~ ditch in~c~ais digital data ..... ............ .............. ~~ ,, , LOG TY~'E ' " RUN 'INTERVALS SCALE' NO. , ,, .... ...... .... ~ ..... r ' ' ~ .... ....................... q c d,~ ..... / I~/r/- / ~3~x'~,, ............. ~l C~T ,, , / ~~r/ --/~v/~' ~, ......... 14} ' 1~ ...... ....... ,,, ,, 16}. ,,, ,, , ................. ~ ~ .... BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 04/11/90 Transmittal: 81061 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS'/ Enclosed is your copy of the material listed below. If you have questions, please contact BP Well Records at (907) 564-4445. Y-27 CBT 04/06/90 #1 12565-13393 Sch 5" Y-27 CET 04/06/90 #1 12565-13414 Sch 5" any Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERIAOIR . ARCH1-V~S-----'~ Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To ARCO EXXON PHILLIPS STATE OF ALASKA Date: 03/30/90 T#: 81022 SYSTEM Tape & Transmittal 0nly ARCHIVES BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Y-27 OH/DIFL/BHC/CNL 03/19/90 Atlas#4241 1600bpi #- 10122-13495 API#50-029-22019 Tape Pos.#06992 Information Control Well Records LR2-1 J. Dietz/S. McCurry February 22, 1990 Telecopy No. (907) 276-7542 G W Kirton PBU Lead Engineer BP Exploration (Alaska) Inc P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit Y-27 BP Exploration (Alaska) Inc Permit ~ 90-28 Surf Loc i448'SNL, 384'WEL, Sec 33, TllN, R13E, UM Btmhole Loc 857'SNL, 2786'WEL, Sec 5, T10N, R13E, UM Dear Mr Kirton: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a dtverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. Very truly yogurts, Commissioner Alaska Oil and Gas Conservation Commission BY ORDER OF THE COMMISSION jo Enclosure C: Department of Fish & Game, Habitat Section - w/o encl Department of Environmental Conservation - w/o encl BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 February 16, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton Y-27 (31-05-10-13) PBU Enclosed, in triplicate, is form 10-401, our Application for Permit to Drill the above-named well. Also included are the attachments listed on the application form, and a check in the amount of $100 to cover the permit filing fee. A cellar and conductor is presently being installed at the wellsite, and a survey plat will be forwarded to your office as soon as one becomes available. Yours very truly, G. W. Kirton PBU Lead Engineer GWK/KTH CC D. Hsu Well File STATE OF ALASKA ALASKA ulL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 la. Type of work Drill [] RedrillFlllb. Type of well. ExploratoryF-] Stratigraphic Testr-! Development Oil[] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exoloration KBE =77 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P, O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28289 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 1448' SNL, 384' WEL, SEC. 33, T11N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 755' SNL, 2620' WEL, SEC. 05, TION, R13E Y-27 (31-05-10-13) 2S100302630-277 At total depth 9. Approximate spud date Amount 857' SNL, 2786' WEL, SEC. 05, TION, R13E March 1, 1990 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(uDandTVD) proPe~L line 47471 @ 2786' feet Y-19 @ 2062'/8.4 feet 2560 13575'MD/9163'feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 1500'feet Maximum hole angle54.22 Maximum surface 3330 pslg At total depth (TVD) 8800'/4~90 pslg 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" Cond, 80' Surface 110' 110' 17-1/2" 13-3/8" 68# L-80 Butt 2709' Surface 2739 2691' 2889 cu fl Arcticset II & I/I 12-1/4" 9-5/8" 47# L-80 NSCC 13042' Surface 13072' 8868' ~ 2963 cu ft Class G 8-1/2" 5-1/2" 17# L-80 NSCC 753' 12822' 8723' 13575' 9163' !323 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor . -'i~;i~!I ! '. ~ ~ Surface .... ;: , ....... Intermediate Production · Liner Perforation depth' measured ., true vertical , 20. Attachments Filing fee [] Property plat E~ BOP Sketch [] Diverter Sketch [] Dril ling program [] Drilling fluid program [] Time vs depth'plot [] Refraction analysis [] Seabed reportl-I 20 AAC 25.050 requirementsl-I 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed~ ,/~-"J~- Title PBU Lead Engineer ~//~./ Date Commission Use Only Permit Number IAPI number .., IApproval date ISee cover letter ¢' 15o-o.2.?- z..~__o/~" I 02/22/90 Ifor other requirements Condition"s of approval Samples req~lired [] Yes )~NO Mud log required I-IYes,,'l~['No Hydrogen sulfide measures [] Yes ',l~No Directional survey required ~ Yes []'No Required working pressure forB~PE' 1-121~, 1-13M; 1~5M; I-IIOM; I-I15M;' Other; ~ , //"-~t,~ ~ ' by order of Approved by /"~,,,~,~.L. ).~..~'v~ Commissioner me comm,ssion Date Z.---:z Form 10-401 Rev. 12-1-~ Submit in triplicate PROPOSED DRILLING AND COMPLETION PROGRAM WELL Y-27 [31-5-10-131 PBU AFE No. 125159 Install and cement 80' of 20" conductor to surface. Install 20" diverter. The Drilling fluid program will consist of an 8.5 - 9.5 ppg spud mud in the 17- 1/2" hole, a 9.0 - 9.7 ppg water base mud in the 12-1/4" hole and a 8.6 ppg water base mud in the 8-1/2" hole. Drill 17-1/2" hole to 2700' TVD(BKB) and cement 13-3/8" L-80 Buttress casing to surface. Nudge the surface hole 25' to south direction to avoid possible inter- sections with Y-12, Y-19, and Y-20. The closest approach distances after nudge the surface hole are 28 ft from Y-12, 36' from Y-19, and 52' from Y-20. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 3680 psi at 8800' TVD(SS) based on .original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVD(SS) and an oil column to 8800' TVD(SS). Directional drill 12-1/4" hole to the 9-5/8" casing point above the Sag River Sandstone. Run 9-5/8" 47# L-80 NSCC casing to within 5' of 12-1/4" TD and cement with Class G cement around the 9-5/8" shoe. The annulus will be freeze protected by dry crude. Directional drill 8-1/2" hole to TD. Run 5-1/2" liner from TD to 250' inside 9-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" float equipment. Change over to NaC1 completion fluid. Test casing and lap to 3000 psi. Run 9-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree with diesel. Displace tubing to diesel. Set and test packer. Shut down rig operations for perforating subsequent to rig release. will be perforated in accordance with normal practices. The well Fluids incidental to the drilling of a well will be pumped down the 9-5/8" x 13- 3/8" annulus of the well. Tubing Size: 3-1/2", 9.2# L-80, TDS TBG with 5 GLM's. Tailpipe Size: 3-1/2" TAILPIPE 20" Conductor PREL ~ M INARY WELL WELL Y-27 / Y-PE [31-5-10-131 PBU PROPOSED DEPTH MDBKB 110' Ball Valve 13-3/8" Casing Shoe 17-1/2" Open Hole Cement Top 3-1/2" 9.2# L-80 TDS Tubing with 5 GLM's 2100' 2740' 2763' 3612' 9-5/8" Packer 12772' 5-1/2" Tieback Assembly 12822' 9-5/8" Shoe 12-1/4" Open Hole 13072' 13077' 5-1/2" 17# L-80 Butt Liner 5-1/2" PBTD 5-1/2" Liner Shoe 8-1/2" Open Hole 13495' 13575' 13575' BOP STACK CONFIGURATION 13 5/8", 5000 PSI WP TRIPLE RAM ST ACK DRILLING RISER ANNULAR PREVENTER I I PI PE RAMS I I I I I BLIND RAMS i 2" KILL LINE MANUAL HYDRAULIC GATE GATE I DRILLING SPOOL ! I PI PE RAMS I I 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE SURFA(~E HOLE DIVERTER SYS. TEM Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. 10 ~ Valve~ " 35' or as required ...._1 '"-I Dresser Sleeve 10" Diverter Line 1. All pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. 2. Manual 10" I~ valve§ mechanically connected to ensure that one valve is fail-safe open at all times. 3. Ail turns are 90 deg. and targeted. 10" Full opening ball valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet KRL 12/18/89 _$45DUA124:[DRAN034]Y27_CLOSAP_SHORT7.LIS;12 Search Radius= 200 7 DEGREE LEAD LINE For proposed well: Y27 [31- 5-10-13] Location = W-E S-N TVD(SBS) Top 644432.00 5948800.00 -66.00 Bottom 637497.18 5943082.12 9086.00 Note: Ail depths in feet Below Kelly Bushing (BKB) 13-FEB-1990 --- Closest Approach Analysis ---- Date: 13-FEB-90 Time: 21:43:15 21:43 Page 1 Closest Approach WELL IDENT /PROPOSED% /NEARBY% CLOSEST TVD DEPART TVD DEPART DISTANCE A029-2001000 331113 A029-2042300 Y-4 A029-2043100 Y-6 A029-2051300 Y-11 A029-2051301 Y-11RD A029-2051700 ¥-12 A029-2058700 Y-10 A029-2063400 Y-13 A029-2155800 Y-22 A029-2157400 Y-21 A029-2158700 Y-20 ( A029-2159000 Y-23 A029-2160800 Y-24 A029-2185700 Y-19 A029-2188300 Y-25 4041.3 1898.0 4019.5 27.7 1551.9 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 1066.0 0.0 1086.7 1500.0 0.0 1521.3 1971.7 49.5 1991.9 0.0 0.0 19.7 2243.3 124.5 2263.5 1441.4 0.0 1463.6 78.5 0.0 100.0 791.0 0 .0 814.0 1166.0 0.0 1197.1 1266.0 0.0 1289.2 2058.6 69.6 2073.4 1500.0 0.0 1513.3 4.7 10.7 17.1 0.1 10.1 228.9 0 3 30 4 64 0 282 2 15 8 6 4 76.5 63.1 15.0 183.8 70.3 113.3 148.9 30.5 334.3 385.1 17.0 218.8 Vertical /PROPOSED% TVD DEPART Intersection /NEARBY~ TVD DEPART VERTICAL DISTANCE 2137.4 91.0 5730.3 60.2 3572.7 S UM-MAR Y The well which comes closest to A029-2051700 Y-12 the proposed well is: $45DUA124:[DRAN034]Y27 CLOSAP SHORT.LIS;35 Search Radius= 200 COURSE LINE For proposed well: Y27 [31- 5-10-13] Location = W-E S-N TVD(SBS) Top 644432.00 5948800.00 -66.00 Bottom 636852.04 5943969.88 9086.00 Note: All depths in feet Below Kelly Bushing (BKB) 13-FEB-1990 21:40 ---- Closest Approach Analysis --- Date: 13-FEB-90 Time: 21:40:39 Page 1 Closest Approach WELL IDENT /PROPOSED~ /NEARBY~ CLOSEST TVD DEPART TVD DEPART DISTANCE Vertical Intersection /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART A029-2001000 331113 A029-2042300 Y-4 A029-2043100 Y-6 A029-2051300 Y-11 1066.0 0.0 A029-2051301 Y-11RD 1500.0 0.0 A029-2051700 Y-12 1980.9 51.3 A029-2058700 Y-10 0.0 0.0 A029-2063400 Y-13 2263.9 131.4 A029-2155800 Y-22 1441.4 0.0 A029-2157400 Y-21 78.5 0.0 A029-2158700 Y-20 ( 791.0 0.0 A029-2159000 Y-23 1166.0 0.0 A029-2160800 Y-24 1266.0 0.0 A029-2185700 Y-19 2061.6 70.4 A029-2188300 Y-25 1500.0 0.0 4170.7 2077.6 4154.6 29.8 1308.8 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 1086.7 1521.3 2001 19 7 2283 9 1463 6 100 0 814 0 1197 1 1289 2 2076 1 1513 3 4.7 10.7 17.1 0.1 10.1 228.9 0.3 30.4 64.0 282.2 15.8 6.4 76.5 63.1 8.8 ~119.4 183.8 54.7 113.3 148.9 3O.5 334.3 385.1 8.4 218.8 85.7 5607.5 52.6 3467.9 SUMMARY The well which comes closest to the proposed well is:. A029-2185700 Y-19 VERTICAL DISTANCE MUD WEIGHT CALCULATIONS WELL Y-27 (31-5-10-13) Mud Wt. (8-1/2" Hole): P @ Sag River: P @ Top S adlerochit: OB @ Sag River: OB @ Top Sadlerochit: Current GOC: 9-5/8" Casing Shoe: Top Sag River: Top Sadlerochit: 8.6 ppg. 3680 psi. at 8800' TVDSS 3693 psi. 285 psi. 319 psi. 8971' TVDBKB 8857' TVDBKB 8866' TVDBKB 8971' TVDBKB CEMENT CALCULATION 13-3/8" CASING Measured Depth: 2740' Basis: 2 X Annular Volume Total Cement Vol: 2889 cu ft Lead Slurry Vol: 2587 cu ft (1334 Sx Arcticset III @ 1.94 Cu ft/Sk) Tail Slurry Vol: 1302 cuft (1400 Sx Arcticset II @ 0.93 Cu ft/Sk) 9-5/8"CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 13072' 90% Annular Volume to 13-3/8" + 50 cu ft 2963 cuft 2388 cuft (1334 Sx G+8% @ 1.79 Cu ft/Sk) 575 cuft (500 Sx Neat G @ 1.15 Cu ft/Sk) 5-1/2" LINER Measured Depth: 12822' (Hanger) to 13575' (Shoe) Basis: 1.5 X Annular volume to 9-5/8" shoe + 150 cuft Total Cement Vol: 323 cu ft (279 Sx @ 1.16 Cu ft/Sk) DH: 2-13-90 PI&L, I00 06t- TRIP TANK 7.5' D~'~v~ SSER 'TAN 1( I,~O 88L. W,'IJME tlC/D 5YbT'£H .5~gFACE F',a¢ll.i nEs  TOTI~L ~U~FA~I[ ~APACITY r q~o MUD DISTRI6UTION DIT'C ,,' / / / VACUUM TYF~ MUD PtO~ e-ER - Choke Manifold - Poor Boy Degasser · - Brandt Vacuum. Type Degasser - Brandt Dual Tandem Shale Shaker - Pioneer Mud Cleaners - Pioneer MKI Centrifuge I - Recording drilling fluid pit 'level indicator with both visual and audio warning devices at driller's console 1 - Trip Tank (75 BBL.) 1 - Drilling fluid flow sensor with readout at driller's console 11 - 5 Hp Agitators CHECK LIST FOR .NEW WELL PERMITS ITEM APPROVE DATE < 1 ) Fee /~, $Og ~-3/?~ 1. (2) Loc (3) Admin ~% ~2 33~z?/?/~ 9. · ('9 -thru 10. -~,.. '~.~/-Z'. ~°~°~m 11. (10 and 13) 12. 13. (4) Cas~ ~,~, ~-~-q~ (14 thru 22) (23 thru 28) ( 6 ) 0 THER ~p~ ' <]9- thru 31) (6) Add: ~F. ~. Geolog¥: Engineering: rev: 01/30/89 6.011 Company Is the permit fee attached .......................................... Lease & Well NO. YES NO 2. Is well to be located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4. Is we~ located proper distance from other wells .................... 5. Is suzfiCient undedicated acreage available in this pool ............ 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ...................... Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number ......................... 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. For 29. 30. 31. 32. Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ...................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate~,~f Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating - Test to ~OC)C> psig .. Does the choke manifold comply w/API RP-53 (May 84)'. ................. Is the presence of H2S gas probable ................................. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements ............................................. INITIAL GEO. UNIT "ON/OFF POOL CLASS STATUS AREA NO. SHORE o Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the roadability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special 'effort has been made to chronologically organize this category of information. .o PROGRhM: LISCSN REVISION: Start o-f e×ecutiom: Wed 28 MAR 9'0 4:15m **** REEL HEADE~ **** LIS ¢0119103 A TL 0! 'LIS CUSTOMER FORMAT **** TAPE L'rS ~,.~/19103 ut 'OPFN ....... HnLE-DI=L, ~C, CN-GR :} cHr~: RAN:~E PiLE MA i N . O01 I 324 CN : BF EXPLORATION ( aLaSKA WN : Y - 27 (31-05-10-13) FN : PRUDHOE ~Y C0UN : NORTH SLOPE STAT : ALASK& FORM&T mEC, OEO (TYPE:~ 64) T~PE DEPTH UNIT : F 15 E S : NAME CODE SAMPLE# UNIT SR 6:~ I AP! R F 0 C 5 8 1 O H M M · ~itO 65 1 ~HP,!M :, ~ ~4 SPD 68 I ;:/MM SP 6a I MV CHT 68 I L~ ....... BYTES ' , IrC OFILHED 10 AC 6c;¢ 1 1t LSN 58 I i2 SSN 58 1 1 3 CN aa ! 1 4 CNC 56 ! 1.5 TEMP 65 ! US/F 4 CTS CTS 4 PCT mCT ~EG,= * D~TA RECORD DEPTH T~M= 13495.000 0.0000000 =' '" O0 O0 ~ ..,." ~I ~.. lOO.ocoe 13445 2!.99730 86.3560~ 100.0000 13395.000 21,997~0 89.47047 182.5964 13345.000 21 95 1 ~39~ 182.9648 13295.00J ~1,9~?~g 8!.2~875 184.565~ t324~.000 21.99780 135,5233 13195.000 21 .09780 87.58623 1:85.7021 13145.000 ~! 0~7 ~3,!0130 1'~-5. 248~ 13095,000 1 o. ~9'~n,~' .. , ,~.~ ~ ~..~ 80.~25~ I 84 3-~3~ 13045,000 20.e9791 (TYP~ S~ LSN O.O0000OO 30.00000 O.O0000OO -52.48161 30.00000 ~:0.0""81 n -,¢3. 16908 ;~1 O~ 0~,2 25.64725 -40.91 2:~0 93.13980 59.62!93 -14.49077 110.46¥7 8~ 6~n77 ~ i ~...~ .~., -12.7~!~9. 116,3o69 -~,~ 4~, 1.~ 108,75~5 27.952~7 -52.56586 31! ,4900 !6,83102 115.5O51 279.1047 45.8750~ O) 966 ~YTES * R=OC CHT SSN 0.23009u0 SO0 000 "'" 100.0000 5.707368 1062,201 100.0000 6.662931 113t.111 mzA 7401 5 · 21 3~42 1175.130 250.2136 6,422657 1135, 231 271 .4331 10.75415 1152...595 271. ~.104 17.38193 1162.~48 286.3974 10'~2.!7~ 2~7.36~7 16.28e12 104~.114 ~7m.3201 209,831 0 t 037.34 O PlL~ TT~N CN 0.2000000 O.O00000O 4.016643 657'9.62t ~.0000000 2.176669 6736.813 23.14957 1.62~881 6859.566 70.32648 2.8~_4453 0814.055 17.58792 S.60477~ 68~6. · 738 16.1161R 10.53820 6929.570 19.65884 2.13645.~ 67 ,~ ¢--, ,.. 17.1026,.3 94.0L~737 x0'12 '~10 RILM CILD CNC 0.2000093 O.O000OO0 0.3000000 3.930305 248.o541 0.0000060 2.304376 459.4175 27.14957 1.$3o369 616.183~ 24.3264~ 3.0f. 8004 354 21.5,5792 5.05632a 178,4192 20.1161~ 9.781536 94.89290 23.658R4 $.213361 100.2804 23.417~7 1.772314 474.7307 ""h ,"1.10260 55.45152 10.62~42 12995 · !300 122 · 0461 1 3. 2581 0 1 Z · 56236 9.108301 ~. 33-~303 76 ~6.35~C~ T7.~1 ~t P30.6133 ~3-~ 1~945 000 2~',.~R ~:2"' *, 15~80~ 7 3202F~1 23. 99760 1 Z. ~6440 720.77~4 6478.391 ~. 4~7~., ,,, lu9. x6Ox.~ ~ ~68,.~ 0564, I 7.51 67 177.9911 128~500u sO 1087'z 0 ]OnOOOC · .... : ~, ~ ~ m 3.O00OOOO -:~0.0~ ' ,~OOO ~nn 0 ~000 OOS 75.~!>4~ . ~8~,,.v*7aSO 141.1557 54.37407 172.9245 12845.0C0 ,3 uOOO000 c, 2"-r'.nr'''' a "DO0000O .... n,-~,~ 303.,9"00~ 5 gO0. OOa_ .UUUUUuc -80.OfiOfin,..- -'J nnnqn xO.O0000 100 OOOr' o.ono0000 171 2~7 13.~6e43 73.73351 27.80176 7.C00955 14Z.4444 21.51575 u.20OO000 9.0000000 5S.37407 0.2000000 O.O000'300 0.0000003 T '""'r A L,,.,, DATA R~CORDS,... .: STARTING TA°E, **** =iLE TRAILER **** ENDING TAP: CEDTM = 1 p~xo O0 FiLE ;~ 2 **** FiLE HEADER *'*** REPEA. T.O02 1024 FORNAT RECORD (TYPE¢ 64.) ONE D F-- P T d DEPTH UNiT : F CURVES : NAME C03¢: SA,"4DLF-'''' UNIT 1 OR 58 I .&Pl 2 R~OC F,,~ I OHMM x ~IL~ O~ t 4 R i L M. 5 ,~ ~ I 0 H M M 5 SPD 58 I ~tMM 6 S.P 6 c '~ 1 M V 7 C H T .5 F~ I L B ~ TTEN 6~. 1 1 LSN ~"~ I CTS ~., ¢.,~ 2 SSN ~3 1 CTS 14 CNC 5g I ~.CT 5YTES 4 4 * DATa, RE'"'~ ...... ,.~) 966 BY'rES DEPTH TEMP i ~4¢:4 000 O · O 0'" O""" .... ' ,..~U 0 50. gO"" "' 130.0000 25.99730 $5.05676 100.0000 13384.000 23. 09700 99. ~.1 265 1 ,,,'7 77!6 13334.000 22.99770 81.61627 15~.5267 13~34.000 ~5.0515c' 13184.000 8~.784S1 189.~!97 1 31 34. 000 1 8. 03391 9!.47128 188.5897 13084.000 t-~.09863 7~.o2493 187.2284 1 z034 nnn I 3. 99860 60.~363'9 184.5334 12984.000 1 6. 00430 75.0485t 12934.000 1! . 0045,0 GR ~ SN n.ooonono -$0.00000 50.00000 0.0000000 -39.~660'7 30.00000 5n ~77 -1 28. x30~ 89,4 S 5,q. Z 7928 8C,~41 406 ! 25,29018 f;6,49541 31,234'32 -tt2 122,0,534 126.6230 -32.47282 m5.61630 23.26360 -76.67eoo 89.79620 78 54 ~ 5 4 -8.674334 173.0~67 119.58~0 -20.52¢51 Z7~. 5068 84.37753 67,29465 -14.09239 R~:OC CHT S ~: r,.~ 7.8,70340 1045.149 ~¢O.uOOu 4.915755 1 0 o 7.6 a 3 :57 446 : 442 ?~SE 1112.613 5.97~139 lC)73.105 246.2767 9. ttt5.768 203.4160 ~ ~ r* 3 g5 07.63P ~0 441 Il, ! 5 · 1791 5 937.2737 7~59. 7727 57.2638L 740.3391 33Z.0081 2~4 3e45 949.E939 4¢P 7729 920 105~ 345. 7737 RILO TT '-- N ~.. N 9.2000000 ~00.00" O.CO00000 3. 754973 6904. 030 O 00003'"" 1 .4663~'z 6 S74.556 22..69254 3.5197~3 69~6.137 !7.70511 ! ~071o6 ~865.~91 22.~572~ 2.576667 6906.406 !5.9529.6 6.961351 6883.473 ~ 0771~ 10.79297 672.4.699 22. ;S 0730 1~.92354 6506.629 11.27179 38.49814 6937.008 6.5'~8989 27.95563 6773.523 1C.97929 5.43639~. '~'~4.3~5 RILM CILD CNC '3.2000000 O.OOOOOO0 0.0000000 4.440696 26e,.31'35 0.0002000 1.514~05 682.1035 26.69254 3.471669 2 ,,;; '~. 1084 21 .70511 2.022045 528.4355 26.E~72~ 3.0653~1 ~47.6245 20.9529b 6...-961763 1 43.65,33 27.07719 9.003651 92.652'92 26.80730 1 ~ ~9937 ~ m ~ 67.00821 15.2'7179 32.37005 25.9752g 10.59~99 22.72847 35. 770g2 14.97929 2.146629 1~3 9454 1 28,~4. 000 0.0000000 50.0000° 82.14572 -Du. OuO00 28.21361 300.~r, I 57 801 = O. 20,",~ u,~O00 5nOn 003 53.45656 0.2000003 ~ O000qO" 57.48650 TOTAL DATA RECORDS : 86 STARTTNG. TAmE~ D~PTH~ = 134~cu ·00 FiLE TRA'LER **** E N 0 ! N G T&~E DEPTH = 12~4~.00 F'rLE~. ~*~: 3 **** ~iLE. HEADr"R **** CHCN .O©% 1024 FORH&T RECORD (TYPE~ 64) ONE DEPTH P~R FRA~ TAPE D=°TH UNIT 15 UNIT BYTES &P! 4 ;~ H M M 4 0 H M M 4 := I .t'4 t,,: 4 MV 4' L8 4 ,"qMH 0 4 US/r- 4 CTS 4 CTS 4 PCT 4 mCT 4 DEGF 4 * DAT~ RECORD (TYPE~ :3) 966 BYT'S DEPTH GR RFOC RiLD SPD .SP CHT TTEN AC LSN SSN CN TEMP u · 0 ,,.,.'. ;..¢,..: ~ 0 30.00000 13042,000 O.nOOOOg~ 50.00000 100,0000 jO0 1 GO. 0000 RiLM CILO CNC 0· 20OOOnO C. OOOOOO0 -0.7529571 129o2 O0~ ' ~ 2 07o.$40 2 0346}2 u 0 OOO0~O0 -z 01'~4'~-- 10(].0000 129~2.000 76 · 1 7'9~ ~ 173.25-2g 39.43211 7~' 1 7929 173 40.55400 76.17989 173.6934 12792.000 40.001~1 76.17989 173.5872 12742.000 45.~6561 76.17989 173.31P5 12692.000 4~.99550 76.17989 172.7a35 I 2642. 000 45.03t 2n.,~ 76 · 1 79a9 172.0831 12592.000 45 4n~ 70 76.179~o !71.4697 12542.000 44.99550 76.17989 170.8391 1Z4~.000 ~5.95~81 76.17~ac 170.0756 12442.000 ~4.0~550 76.17~9 169.7257 12392.000 44.~9550 75.17989 1~9.4476 123~P.~0~. u 4~ nO1 40 125.4610 '~2.40601 -t~7 3354 31.33!91 -153. ~925 '95.1 551 5 -!30.3432 -1~0.2t21 9 xn5~o -171 .6397 ~";' 6261 77. 34593 -137.4105 27,31830 -1~9.0a06 26. 909013 -t 23.42160 7! .20003 -129.5265 3,~. 89C10 60.92795 -150.6732 29.48000 64. !:9.70t -152.8507 3'~ 9A-440 -143.2344 915 5 ,.~ ~' 2.338061 870 93'~4 14:3.2523 P.~4m~ :$75.1~65 t38.6955 2.343503 ~28.7354 140.3050 2.342203 827.c, 216 136.5361 ~ 3k35~7 794.6616 I 35.1 ,~:. 344:~16 3049 !:5.77~7 2.3414b0 831 145.?032 461 2.337023 $~9.876? 1~7.8365 2.343209 ~2P.2494 ~.029230 6537.723 19.67812 1.~-51065 5551.938 45 4241~ 1. $66,319 65_~7.656 52.58133 t. 3,51 61 5 ~474.81o 47.71 890 1.854692 6453.246 56.06046 1 .862259 6452.789 55 2792~''' 1. ,36336 6415.375 55.20123 1.857255 6346.949 54.42094 .~' _ 6306.000 70.315~3 I .861337 63C, 4.76,~ 48.17456 1.857915 ~26.~44 45 ~2936 I..R 5901 2 41.8ZO:~O I .856743 ~192.137 03'3961 492.797~ 2'3.~7333 I ~7~559 537.3267 43.13556 ~3~ 6704 49.4~11~ I 2790~e 537.1b~0 45.17329 I . :B74700 53o.1733 52.58057 1 .~74965 536.982~ 1 .g77249 ~,A 664~ 51.3,1757 1 538.4290 51 .12457 1.872891 537.3306 65.23e17 1.878523 =37.~4~ ~5.5 V79C', 5'58.23'78 43.4~539 I . ~7644~'!' 537.9202 3o. . ;'411 5 12292.©00 76.1798o 169.C, 320 12.242.000 44.99550 75. I ," ~;**~ 1 65.6557 1 21 92. 45.95351 75.17980 165.0267 12t~2.009 46 9' ~'~ 7'n 76. t 7939 167.3643 120P2.00!3, 46.03111 7'.5.17989 I 66. 5950 12042,000 46 ~950~ . ~ ~..~ 75. ! 7980 155.9152 1!9o2.000 45.39571 76.!798~ 165.!534 11942.oeo 46.40160 76,1~q~a 164.4385 11892.000 46.03700 76.17o~9 163.841S 11842.000 4~ 9~41 153.256t 11792.000 ~5.o9541 75.17987 162.~62! t1742.000 46.43730 75. ! 7~89 1~'~.07a~ 116¢2.uu0~'*' 45.99541 76.17~8~ ...... 53,32773 -160.7786 ~ ~1091 75.70232 -1A~.91~5 29..'.'.'.5 $ 770 68.54599 -13t,1503 ~.~6~1 ~ 1492~ -138,87R0 28.92270 72.04597 -137.6973 27.51291 -t55 2~.56120 7g.91205 -145.539t ~ 078~0 71.22457 =~.e2~1 ~.3946t -!74.483t 26.22873 73,2?325 -142,~061 25,10361 77.37018 -153.578~ 22.71840 -lO5.1074 ~1 ,~300 44.57204 -137.75_,27 41.79111 ~.34,st76 800.19S? !47.2281 807.S772 139.3333 2.348455 :~05.9727 2,3526.~3 792,9e19 135,2402 2.343405 $03.6160 132.~247 2.349,566 822.2455 136.0624 2,353182 $12,347~ 139,0503 2,345142 802,6700 137,509~ 2.353580 ....,~, 04. B 70 :=,., 1 ~ 4256 803,'~473 133.5745 2,~56104 7~'.7,3130 t27,7288 2.35218~, 752.2515 139,3340 2 · 350! 3C 748.5666 150.5781 I. 55274.3 · ~1 52 · 073 35.8.304O 1 ..562427 6151.3o6 51.48413 I .857816 .~88.242 64.48,927 1. $51~,72 5970.297 59.0508~ 1.85~016 5951.66~ 48.47807 1,858736 5991.145 46,79102 1,$533Ol 5~52,750 58.00241 1.$60454 5885.617 54.52757 ! 5924.66~3 6.4.1 9907 1 ,856194 5854,363 5-5.1 3753 I.~52727 5781.43~ d4.89366 1 .F58655 57~2.250 ~5 21706 I .857579 5?27, a79 35,14247 535 74~ x7.~,3272 t. 8'79831 536.933~ ~$. 51 571 1.874581 538.2666 60.36519 1.866881 540.t108 55.P412o 1,375297 538.2085 45.S4734 1.873935 5~8, n~O0 1,8711'70 53o,5603 54.304~7 1.850021 537,5002 51.21927 1.877888 536.5432 59.~,~745 1.$73S9~ 538.7371 52.64388 1 · 539.7449 60.42427 1.876,"&O 7 53~ .0234 36.73563 .873389 3350 3~,00543 11642,000 45,99541 70, I 79~.39 1.51,4564 11592,000 99541 76,1708o 161,1475 11 542, OOO 45,o95~.! 76,17989 160,5264 1!492,000 75,17989 159,8849 114C2,000 46,~9532 76,179~9 159,2133 11392,000 47,0310! 7.5,!7¢~ 15S,5923 11342,000 47,03101 76,17989 157.~529 11292,000 46,~9532 7~,17¢89 157,3826 11242.000 47.03t'3! 76.17089 1~6.72.51 11192,000 46,9953~ 76,17989 !56,1161 1114Z,00~ 46,99532 76,179~'~ 155,540~ 110'P2.000 /.,,.7.'::;¢,900 76,1798¢ 1 5¢, 97~.6 11042.000 46.09552 7* 1 154.4173 55,379~4 -1~3,3205 31 ~ 70. 09334 -143,6161 62,08052 -t 34,609 6 3! ,78960 67,8731~ -137 '~ 61z, 25.89130 06,76973 Z3,3B710 70,85866 -141,7799 2~,99350 70.2,5021 -! 36,006,7 26.25391 66.773~0 -137.9572 Z6.74141 58.87236 -!57.898~ ~7'.~4460 4~ 7~2 , ,.,., . -1 ~ 8. 4664, 32,5~271 67,15773 -!42,6923 27.34410 66.16505 -142.569'2 24.71021 65,59543 -166.~,710 23,73511 2.355300 775.8679 145.5~78 773.~030 136.0497 2.3544~1 75,0.2009 130,0573 2,356563 7~3,1821 134,0089 2,35~!68 767,3276 1~ ~41~ 2,356576 765,444.S 128,Zt46 ~.3~0872 '764.1399 1~8.3507 2,359099 785,7368 129,778'B ~.360093 772.49~1 lxO 297~ 7~7 853° 137,1852 363086 6,7295 130,9531 2,363321 784.4780 129,0131 2.364062 81 9,61 96 1'~ ~3:~ 571 0..505 41 .42538 t.857455 5665.227 54.58024 1,859241 5f77,621 1.852620 5643,69'5 55.48177 1.~56595 5542,625 62,79987 t.856946 5532,891 59,09378 1.850~71 5509.629 49,S8153 1.856427 5537,227 53,03967 1 .860737 5517.961 53.5614~ 1,860262 5466.500 50.55640 1.$57164 5598.551 50.61288 I . 85495S 5427.66'3 02.58914 1.857713 5481.785 ~0.12114 1.872440 5 '38. 0795 39.5L~459 1.873579 53~.3705 51.35480 !.$73820 537.8538 46.5~154 1.~70105 539.7761 52.06656 1.873250 538.6204 58.564~6 I 87~12 538,51~6 55,27399 1.868416 540.Z861 47.0935?, I 8719=1 53¢.6692 49.g9801 1 ,.¢~'77027 537.4214 50. 361 35 1.875504 5x7 47.698~9 1.875494 53~.4553 47.74304 1.8v1243 539.0959 58.37790 I .$74139 538.2~64 56.18631 47.43! 7,6. ! ?gsg I ~ 77?0 10942.000 47.55330 76.17959 153.!2.71 108~2.000 4,5.99532 76.1795g 152.503,S 1084£ uuO 46.99532 76.17989 151.8871 10792.000 45.99541 151.2700 10742.000 47.00121 76.!7o$9 150.6910 46.o~52 76.17989 150.0~16 10642.000 46.55341 75.17~89 t49.54~3~ 10592.000 46.03111 75.1798o 148.9~* 10542.000 76,!79~9 1¢~.365t 10492.000 45.00140 76.179~9 147.7877 10442.000 76.17989 147.2275 10392.000 44.09550 76.17~8¢ 146.~907 -1~'5 91,~2 24.95261 -t~7.577~ 6z,.. 56427 -t 1 4. ~901 ~1 .7152~ 11i~.9224 -47.17369 26.74'271 1 50. -~ 2Z.15~5,~ 14O.la98 £4.678¢o 43. 37195 -~5.,, .317c5 46.45610 151.2~22 -77.30865 25.~1570 114.8.45~ -77.07770 22.82401 86.1 9298 22. $~1 ~0 66.15~57 -37 3~ 313 28.31950 810.9387 ! '~ "" ~u.7~6 2.363450 12~ ~201 2.370443 847.0574 121 .3016 2.366194 ~,~ 9236 118.3696 2.369621 885.4519 130.357~ 2.371e6; ~,~6. o3~3 1~4.393o 2.373932 862.9189 122.3141 2.369193 877.~.~392 166,0188 8.370837 854.0820 124.2464 37545= 867,01 27 1 20 008~' 2.370844 877.5179 126.505~ Z.374008 I 26.6 7! ',~ 5446.461 I. 85,~o62 5z, 82.016 57.140'~7 1.~44,n 5476.883 50.093,~,5 1.R52916 5437.957 61.24196 1 .R57117 5433.32 ?; 54 I.,'$54~46~ , 5373.492 55.20216 1.854419 5372.797 56.30252 1.355347 5361.250 38.9~877 1.855510 5370.227 58.3400~ 1 65.36305 1 .ck53861 5303.418 55 !.355154 5299.488 44.29985 1 . ~-~O ~' 0 5714.250 54.19554 539.0o95 50.3.5641 1.~75987 537.9340 53.53935 t .870375 53,0.2407 47.814~6 53c¢.68~9 ¢7 131~i~ ¢¢ m 1.~72150 53~ .~690 5!. 274,6.C 1.872258 539.3027 51 a18~0 1.370863 52.79544 1.874930 538.1125 ~7 ~676~ !.869967 538.9355 54.60326 1 538.7107 6'3. 841 1 .$71965 53 o. 414 ,'~:; 52.43562 1 ~ 71 '~ ..... ~ 59 5~e 030~, 1.R6939~ 539.6509 50.974~,~ 10 10 10 19 0 12Z.1299 70 3~2x6 ?.92,000 ;~t.8~7Z2 2,369738 1.853913 1.S7275'9 44 ,09~50 -7? ~26~4 ~63 ~84 ~14'~ 449 ~30 3907 ~5.17C:~0 ~'~ ~660 1~ 23~0 5~ ~10t9 54.66702 1~5.6654 192 0'''* l n'~ 6730 n )000000 n .... · ,~...:~ ....... ,.,.2000003 0 ZOOnO0r~ ,. ",~-~ 50nn 000 0 O0000OO 76 17a39 25 ~83'~1 1~8 ~943 55 21s45 51 ~3371 14~.6044 TOTAL DATA RECORDS : STARTING TAPE DEPTH = ¢ILE T~AILE~ ENDING T~,PE DEPTH : 10122.00 **** T~P-~ TRAIl ER LIS ~0/!~/03 ~341 01 TOTAL R:CORDS IN TH*c LOClrAL T~PE : ~77 **** RE:L LIS 90119103 ATL'&S 01 TRAILER. **** TOTAL R~-r'ORD'~,,,.,, ,.., _TN T~iS TOTAL R:C.~R~.;~ IN THIS End of execution: Wed Elapsed. ex:ecut±on ti~s = 2 LOGICAL REEL : PHYSICAL REEL: minutes, 4: 1'/!~ SYSTEM RETURN CODE