Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout213-081Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:213-081
6.50-029-21880-01-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
11128
11078
9058
8508, 8638, 8684
None
None
8223, 8344, 8386
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 30 - 110 30 - 110
Surface 2627 13-3/8" 29 - 2663 29 - 2663 5020 2260
Intermediate 8972 9-5/8" 28 - 9003 28 - 8687 6870 4760
Production 334 7" 8736 - 9070 8435 - 8751 7240 5410
Perforation Depth: Measured depth: 10236 - 11000
feet
True vertical depth:8955 - 9005 feet
Tubing (size, grade, measured and true vertical depth)3-1/2" 9.3# / 9.3# 13cr85 / L80 26 - 8765 26 - 8462
8508 8223Packers and SSSV (type, measured and
true vertical depth)
3-1/2" HES TNT Packer
Liner 2608 2-3/8" 8517 - 11125 8231 - 9093 11200 11780
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
N/A
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
2691095263167651
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Brian Glasheen
Brian.Glasheen@hilcorp.com
Authorized Name:Stan Golis
Authorized Title:
Authorized Signature with Date:Contact Phone:907.564.5277
Treatment descriptions including volumes used and final pressure:
13.
Sr. Area Operations Manager
Operations Performed1.
Abandon Plug Perforations Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured9096
Sundry Number or N/A if C.O. Exempt:
321-073
3-1/2" Baker SAB-3 Packers 8638, 8684 8344, 8386
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Extended Perf w CTU
Operations shutdown
Change Approved Program
5
N/A
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend 5Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 028263 PBU W-18A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
176 389 620 1035 263
By Samantha Carlisle at 12:17 pm, Mar 15, 2021
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.03.15 10:16:39 -08'00'
Stan Golis
(880)
RBDMS HEW 3/15/2021MGR15MAR2021DSR-3/15/21
ACTIVITY DATE SUMMARY
2/28/2021
***WELL FLOWING ON ARRIVAL****(drift perf)
DRIFT WITH 10' X 1.75" DRIVE DOWN BAILER. TAGGED DOG LEG @ 9082'
SLM.
***WELL FLOWING ON DEPARTURE***
3/7/2021
CTU #9 - 1.50" Coil
Job Objective: Extended AddPerf
Travel from SLB Yard. MIRU CTU.
...Continued on WSR 3-8-21...***CP
3/8/2021
CTU #9 - 1.50" Coil ***Continued from WSR 3-7-21***
Job Objective: Extended AddPerf
Perform weekly BOP test. MU HES logging assembly with 1.76" drift. FP the Flow line
with diesel from Coil. RIH with logging BHA. BH Kill with KCL w/SL at 2 bpm, Went
on a Vac after 100 bbls. Tagged PBTD at 10,989'. Log up and painted Red Flag at
tag depth 10,989, Blue Flag at 10,195'. POOH while keeping hole full. Estabish fluid
barrier with 0.6 bpm losses and maintain MCHF. Determine +15' correction from log,
PBTD of 11,002'.. Discover pump problems while PT MHA, shut in well while
repairing.
...Continued on WSR 3-9-21...***
3/9/2021
CTU #9 - 1.50" Coil ***Cont. from WSR 3-8-21***
Job Objective: Extended AddPerf
Repair Pump and Re-Kill Well. Make up Perf gun run #1 with 284' of 1.56" 6 SPF /
60deg HES Millenium Perf guns, RIH correct depth at Coil Flag. Perforate interval
10700'-10875' and 10954' to 10984'. POOH.Flow check well. Pull & LD Guns. Make
up Perf gun run #2 with 379' of 1.56" 6 SPF / 60deg HES Millenium Perf guns.
***Continued on 03/10/21***.
3/10/2021
CTU #9 - 1.50" Coil ***Cont. from WSR 3-9-21***
Job Objective: Extended AddPerf
RIH with gun#2. Correct depth at coil flag. Perforate intervals 10236'-10307', 10397'-
10459', 10481'-10541', and 10570'-10,615'. Pooh. All shots fired and perf guns
retrieved. Well FP. RDMO CTU.
***Job Complete***
Daily Report of Well Operations
PBU W-18A
Operator Name:2.
Exploratory Development
Service
5
Permit to Drill Number:213-081
6.API Number:50-029-21880-01-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Field/Pools:9.
Well Name and Number:
ADL 028263
Property Designation (Lease Number):10.
341 8.
PBU W-18A
7.If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception?
Stratigraphic
Current Well Class:4.
Type of Request:1.Abandon Plug Perforations 5 Fracture Stimulate Repair Well
Operations shutdown
Extended Perf w CTU
Op Shutdown
GAS
GSTOR WAG
SPLUG
Abandoned
Oil 5 WINJ
Exploratory Development 5Stratigraphic Service
WDSPL
12. Attachments:
PRESENT WELL CONDITION SUMMARY
11128
Effective Depth MD:
13cr85 / L80
11.
2/17/2021
Commission Representative:
15.
Suspended
Contact Name: Brian Glasheen
Contact Email: brian.glasheen@hilcorp.com
Authorized Name: Stan Golis
Authorized Title:Operations Manager
Authorized Signature:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Yes No Spacing Exception Required?Subsequent Form Required:
Approved by:COMMISSIONER
APPROVED BYTHE
COMMISSION Date:
5OtherAlter Casing
Pull Tubing
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
COMMISSION USE ONLY
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Detailed Operations Program
Packers and SSSV Type:
3-1/2" Baker SAB-3 Packers
Packers and SSSV MD (ft) and TVD (ft):
Perforation Depth MD (ft):Tubing Size:
Size
Total Depth MD (ft):Total Depth TVD(ft):
9096
Effective Depth TVD:Plugs (MD):Junk (MD):
Other Stimulate
Re-enter Susp Well
Suspend
Plug for Redrill
5Perforate
Perforate New Pool
8508, 8223
8638, 8344 / 8684, 8386
Date:
Liner 2608 2-3/8"8517 - 11125 8231 - 9093 11200 11780
Well Status after proposed work:
16. Verbal Approval:
5
Change Approved Program
29 - 2663 29 - 2663
14. Estimated Date for Commencing Operations:
BOP Sketch
30 - 110
Structural
6870
Proposal Summary 13. Well Class after proposed work:
3-1/2" HES TNT Packer
10305 - 11000 8950 - 9005 3-1/2" 9.2# / 9.3#26 - 8765
Production
11078 9058 None None
30 - 110
13-3/8"
9-5/8"
Contact Phone:(907)564-5277
Date:
4760
80 20"Conductor
2260
GINJ
5
Post Initial Injection MIT Req'd? Yes No
5
Comm.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Surface 2627 5020
Intermediate 8972 28 - 9003 28 - 8687
334 7" 8736 - 9070 8435 - 8751 7240 5410
Address:3800 Centerpoint Dr, Suite 1400,
Anchorage, AK 99503
3.
No 5Yes
Casing Length MD TVD Burst
Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft):
Collapse
MPSP (psi):
Wellbore Schematic
Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval.
No SSSV Installed
2575
By Samantha Carlisle at 9:11 am, Feb 08, 2021
321-073
Digitally signed by Stan Golis (880)
DN: cn=Stan Golis (880), ou=Users
Date: 2021.02.05 07:52:41 -09'00'
2575
SFD 2/9/2021MGR09FEB2021
CO 341H
SFD 2/9/2021
DSR-2/8/21
10-404Yesn Required?
Comm
2/10/21
dts 2/10/2021
JLC 2/10/2021
RBDMS HEW 2/11/2021
Add Perf
W-18A
PTD:213-081
Well Name:W-18A Add Perf API Number:50-029-21880-01
Current Status:Shut-In Rig:CTU & Surface
Deployed TCP Guns
Estimated Start Date:02/20/2021 Estimated Duration:3days
Reg.Approval Req’std?Date Reg. Approval Rec’vd:
Regulatory Contact:Abbie Barker Permit to Drill Number:213-081
First Call Engineer:Brian Glasheen 9075451144
Second Call Engineer:David Wages
AFE Number:212-00164 IOR 120
Current Bottom Hole Pressure:3455 psi @ 8,800’ TVD 7.6 PPGE | 9/10/2015
Maximum Expected BHP:3477 psi @ 8,800’ TVD 7.6 PPGE | Average Ivishak BHP)
Max. Anticipated Surface Pressure:2575 psi (Based on 0.1 psi/ft. gas gradient)
Last SI WHP:2070psi (Taken on 07/25/18)
Min ID:1.78” ID DPLY Sleeve @ 8517’ MD
Max Angle:100 Deg @ 10131’
Reference Log: PDCL 02/3/2014
Tie In Log: Coil Flag 03/31/2014
Brief Well Summary:
W-18A was drilled in 2014, its liner cement job was over displaced resulting in a wet shoe. An initial CBL was
run then a remedial cement job was pumped and another CBL run.
Its original perf strategy was conservative due to concerns about water from the fault crossed at 10,134' (60' of
throw, ~0.3 bpm loses) and a fracture at 10,472' MD (no throw, no noticeable increase in loses).
In 2017 a CT milling and mud acid job was performed on this well. Coil milled to 10960’ before running into
weight transfer issues, SIT have been performed so the liner should still be clean down to at least 10960’. We
have perfs deeper than 10960’ however if we are not able to drift past 10960’ we will forego shooting perfs
below 10960’.
Objective:
Use coil to add new perforations.
Slickline:
Drift to deviation with 1.75” OD tool string noting tight spots and samples return in sample bailer.
Sundry Procedure (Approval Required to Proceed):
Note: The well will be killed and monitored before making up the initial perfs guns. This is generally done during
the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or
circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be
killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the
firing head.
Coil Tubing:
1. MIRU Coiled Tubing Unit and spot ancillary equipment.
*
Add Perf
W-18A
PTD:213-081
2. Bullhead 126 bbls of 8.4 ppg 1% KCl or 8.5 ppg seawater down the tubing to the formation. (This step
can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at
the discretion of the WSS.)
a. Wellbore volume = (8517’ X 0.0087bpf) +(2608’X0.0039) = 84 bbls
3. MU and RIH with logging tools and dummy gun drift BHA to resemble perf gun. Tag PBTD prior to
logging OOH. Or tag restriction at 10,9060’ MD.
a. Contingency: Motor and mill may be used to clean liner to desired perf depths.
b. Contact OE Brian Glasheen to discuss contingency plan.
4. POOH and confirm good data.
5. Contact OE prior to perforating for final approval of tie-ins.
6. Freeze protect tubing as needed.
7. At surface, prepare for deployment of TCP guns.
8. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/8.4 ppg 1% KCl or 8.5 ppg as
needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished.
9. Pickup safety joint and TIW valve and space out before MU guns.Review well control steps with crew
prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety
joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the
working platform for quick deployment if necessary.
10. Break lubricator connection at QTS and begin makeup of TCP (1.56" Millennium or equivalent) guns and
blanks per schedule below.
W-18 Addperf Schedule per Tie-In log depths
Perf Interval Perf
Length
Gun
Length
10236-10307 71 379
10397-10459 62
10481-10541 60
10570-10615 45
10700-10875 175 284
10954-10984 30
11. RIH with perf gun and tie-in. Pickup and perforate intervals per Perf Schedule above. POOH.
a. Note any tubing pressure change in WSR.
12. POOH. Stop at surface to reconfirm well is dead and hole is full.
13. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown
of TCP gun string.
14. Repeat steps as necessary for subsequent guns per Addperf Schedule above.
15. RDMO CTU.
16. RTP or FP well.
Assure excess fluids available to keep hole full.
Standing orders flowchart included with this sundry request.
* See note above regarding kill methods if pressure observed
on surface after perforating.
Add Perf
W-18A
PTD:213-081
Attachments:
1. As-built Schematic
2. Proposed Schematic
3. Coil Tubing BOPE Schematic
4. Equipment Layout Diagram
5. Standing Orders for Open Hole Well Control during Perf Gun Deployment
6. Tie In Log
Add Perf
W-18A
PTD:213-081
As-built Schematic
Add Perf
W-18A
PTD:213-081
Proposed Schematic
Add Perf
W-18A
PTD:213-081
Coiled Tubing BOPs
Add Perf
W-18A
PTD:213-081
Equipment Layout Diagram
Add Perf
W-18A
PTD:213-081
Standing Orders for Open Hole Well Control during Perf Gun Deployment
Standing Orders for Service Coiled Tubing Operations While Deploying Extended Length
Perforating BHA
WELL BEGINS FLOWING DURING OPEN HOLE DEPLOYMENT
Pull BHA above
blind/shear rams, and
close blind/shears.
Space out BHA with
safety joint above slip
bowl, set hand slips
Install safety joint with
open TIW
Can BHA be pulled above
blind/shear rams in a single
pick?
Pull hand slips
YES NO
Begin Notifications
Close Upper Pipe/Slip
Ram
Close TIW
Close choke valves, monitor
and record SIWHP
Close choke line.
Monitor and record
SIWHP
Lower safety joint and
space out over BOP, set
hand slips
Begin Notifications
Add Perf
W-18A
PTD:213-081
Tie-In Log
Add Perf
W-18A
PTD:213-081
Add Perf
W-18A
PTD:213-081
Add Perf
W-18A
PTD:213-081
Add Perf
W-18A
PTD:213-081
• STATE OF ALASKA •
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown
❑Sus
Suspend Perforate 0 Other Stimulate 0
Alter Casing 0 Change Approved Program 0
Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Sus Well 0 I�
POther: }�V Of /
2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work
3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 5' Permit to Drill Number: 213-081
AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-21880-01-00
7. Property Designation(Lease Number): ADL 0028263
8. Well Name and Number: pgV yy_18A
9. Logs(List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pools:
PRUDHOE BAY,PRUDHOE OIL
11.Present Well Condition Summary: ;
El YE D
Total Depth: measured 11128 feet Plugs measured
feet JUN 1
true vertical 9096 feet Junk measured feet `J V ?017
Effective Depth: measured 11078 feet Packer
measured See Attachment feet
true vertical 9058 feet Packer true vertical See Attachment feetAOGCC
Casing: Length: Size: MD: TVD:
Burst: Collapse:
Structural
Conductor 80 20"Conductor 33-113 33-113
Surface 2627 13-3/8"68#L-80 32-2659 32-2659 5020
2260
Intermediate 8972 9-5/8"47#NT8OS 31-9004 31 -8688 6870
Production 4760
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
10305-10335 feet 10335-10365 feet 10365-10395 feet 10540-10570 feet 10615-10700 feet
Perforation Depth: Measured depth:
10875-10925 feet 10925-10955 feet 10985-11000 feet
True vertical depth: 8950-8948 feet feet 8948-8946 feet 8946-8944 feet 8927-8924 feet 8922-8926 feet
8950-8968 feet 8968-8981 feet 8997-9005 feet
Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment
See Attachment
Packers and SSSV(type,measured and See Attachment See Attachment See Attachment
true vertical depth)
12.Stimulation or cement squeeze summary: `�I L.��17
Intervals treated(measured): SONE 2 5L 1 t
10305'-10395',10540'-10570',10615'-10700'.
Treatment descriptions including volumes used and final pressure:
16 Bbls 50/50 Methanol/Water,416 Bbls NH4CI w/F103,69 Bbls 12%HCI,70 Bbls 9:1 HF,14 Bbls Wax Bead in OiiSeeker Diversion,644 psi.
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 183 369 228 962 220
Subsequent to operation: 256 372 315 1586 314
14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations 0 Exploratory 0 Development ® Service 0 Stratigraphic 0
Copies of Logs and Surveys Run 0 16.Well Status after work:
Oil 0 Gas 0 WDSPL 0
Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG ❑ GINJ ❑ SUSP 0 SPLUG 0
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Authorized Name: Peru,Cale Contact Name: Peru,Cale
Authorized Title: Petroleum E,'ineer Contact Email: Cale.Peru@bp.com
Authorized Signature: / - Date: 03 3/7 Contact Phone: +1 9075644522
Form 10-404 Revised 04/2017 }/'T L 7-171 1 /' 7 R B D M S L'.- JUN 2 6 2017
'(( Submit Original Only
• •
Alaska Oil and Gas Conservation Commission
333 West Seventh Avenue
Anchorage, AK 99501-3572 RECEIVED
JUN 15 2017
RE: BP Exploration (Alaska), Inc. AOGCC
Report of Sundry Well Operations Summary
June 13, 2017
To Whom it May Concern:
Attached please find the Report of Sundry Well Operations for Acid Stimulation of Well
W-18A, PTD # 213-081.
Sincerely,
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Attachment: Form 10-404
BP Exploration (Alaska), Inc.
P.O. Box 196612 Anchorage,AK 99519-6612
• •
Packers and SSV's Attachment
PBU W-18A
SW Name Type MD TVD Depscription
W-18A TBG PACKER 8495.8 8211.56 3-1/2" HES TNT Packer
W-18A TBG PACKER 8642.75 8347.96 4-1/2" Baker S-3 Hydro Set Packer
W-18A TBG PACKER 8685.23 8387.61 4-1/2" Baker SB3 Packer
~ • i
0
CD CD
m CO O 00 C) Lc)0, In 0 0
(\J U) � o000 ^ 0
C)
w+ OOC) 000CD00000
N Tr O 04 N CO M CO M CO
m LC1 COPsr � 03CO
M 0 0D P- Y- c) N CON LO 0 M
�-- 0 CO 001 0 CD O ,r O O) O) CO
CO CO O 0 M M M M M M
N OD CO CD CD 00 00 OD CO CO 00
0
I-
H
T- 0 COCV CO CO
MNT- MMOO) OCD ,r CO CD
M M M N 0 N M N M M M M
OD OD O) 0 00 cO 00 00
4.0
ti
COO ~OOO � OOd TrCD03CO
`- N QQ)) — OO) M OD 000 Op 0003Op OD
_ r r
1 1 1 1 1 1 1 1 1 1 I 1 1
W 03
Q CD r'h
M N c— I'sCC) 0A O CO CO O)
1 M M M U) �O N M O CO CO
CO 00
m to
L ° 000 0 20000000
CO U CO , CO r co
CI U F— M 000 J M M J J J
C � 2Er- J4T # 4t *k *k
N O0 *k * • NM• NM• N
Cu C) 63 �• N - CD- O) � O)
♦ 00 - CV - N CV
C. N cY) `f C j N „ T-
Chi N . M ,. M ,r M
N 4 M
•C
rr
0
C CO CCOO O)) M � � t CO j LC
j (0 C')
J N CO N M OD
CeW
Q
C O W
15 () W
C) O W W W W W Z Z Z Z Z Z Z
Z
ZZZ
CO m CO CO CO m m
I—
IFiLL= • 4-1/16'CNY • r-11,
WfLLFEAD= (uK3=VOY W-18A SAFETY NOTES:WELL ANGLE>70°@10890'***
ACTUATOR= BAKER 3-1/2"CHROME TSG&LNR**'
AL KB.ESE 82'
ril
BF E.EV= 54.34'
NTI2133' -13-1/2"FES X NP,a=2.813"
KOP= 517r 20'CONDUCTOR -1
Max Angle= 100'@ 10131'
Datum M)= 9244' GAS LFT MMNDRH_S
Datum TVD= 8800"SS , ST 1 MD TVD DEV TYPE VLV 'LATCH J FORT ATE
� 5 3192 3192 0 MMG DOME RK f 12 01/03/15
113-3/8"CSG,72#,L-80 BTRS,D J=12 347" --1 2663' r 4 5109 5109 8 M4r1G DONE RK 16 01/03/15
13-1/2'TBG,9.2#, 13CR-85 JFE BEAR — 4682' 3 6181 6108 30 WAG MY RK R 0 11/29/13
1 2 7286 7103 23 MNG DOME RK 16 01/03/15
IXO TO 13GR-85 VAM TOP 1 8261 7996 24 1 NUS SO RK ! 20 01/03/15
Minimum ID = 1.78" @ 8517' W j 8487 --13-1/2"FES X NV,D=2.813"
ALUMINUM BUSHING IN DEPLOY SLV
�� 8508' I--9-5/8"X 3-1/2'FES TNT PKR D=2.949'
TOC(10/24J14) —1 8520' 1 8517' j-12.70"DEPLOY SLV w l SEAL BORE,D=2.25'
iALUMINUM BUSHING@-8526',ID=1.78"
it
3-1/2"TBG,9.2#, 13CR-85 VAM TOP, 8601' /'j, 8543' 1-13-112"FES X NP,ID=2.813" 1
0087 bpf,D=2.992" I
h'0 " 8616' t--9-5/8"X 3-112"LAVOLE OVERSHOT
3-1/2 TBG STUB(06126/13) 8604' o. ' 8629' I3-1/2"HES X!ii1P,D=2.750"
MI' , M4 8638' I--9-5/8"X 4-1/2'BKR SAB-3 PIR,D=3.875"
Iw 8660' j—3-112'FES X NP a=2.750" BEHIND
3 112"TBG STIP(07104100) --8671 :11' 8688' r—f 3-1/2"BKR SEAL ASSBMBLY CT LNR
l w to SEALS,D=3.001'
4: 8684' _I---9-5/8"X 4-1/2"BKR SAB-3 PKR,D=3.99"
TOP OF 7'LNR H 8736' 8732' —3-1/2"SWS NP D=2.750"
"�41'�, 8753' 1-3-1/2"SWS NIP,D=2.750" BEHIND
3-1/2"TBG,9.2#,L-80, 0087 bpf,D=2.992' - 8765' 8766' 3-1/2"WLEG,D=2.992" CT LN R
9-5/8"CSG,47#,NT-80S BUTT XO TO NSCC —1 8846' ---."< y, \t«
` ��, 8770' 1--I E114%3 TT LOGGED 03/11/93
9-5/8"CSG,47#,NT-80S,D=8.681" —{ 9003' ,. Jew8989' 7"MARKER JO
13-1/2"MONOBORE WNPSTOCK(01/16/14) --{ 9070' ..),,:'<;4 ::x::•
PERFORATION SUMMARY ,/,,,,
•,.'., `%. NILLOUT WIVDOW(W-18A) 9070'-9077'
REY LOG: GR/MC ON XX/XX/XX ,::.X X.'
ANGLE AT TOP FEE 95'@ 10305'
Note;Refer to Production DB for historical pert data
SEE SPF INTERVAL lOpn/Sqz SHOT SQZ . ' '..
1.56"I 6 10305-10395 0 0410 ,W1/14 X, , e*" PBTD 1 11078"
1.56" 6 10540-10570 0 04/01/14
it.N'<< i
1 56" 6 10615-10700 0 04/01/14i. ':? •
Nprie, With,
1.56" 6 10875-10955 0 04/01/14
1 56" 6 10985-11000 0 04/01/14
! 2-3/8"LNR 4.7#,13CR HYDRIC 511,.0039 bpi,D=1 995" I 11125'
7'LNR,26#.L-80 IJ4S,.0383 bpf,D=6.276' — 9550'
DATE REV BY COM VENTS I DATE REV BY COMMENTS PRUD 1OE BAY MT
11/28/88. N22E INTTAL COMPLETION 03/19/14 JR PJC SOZ PERFS(03/17/14) WELL. W-18A
08/05/90 0-16 RWO 04/01/14 JEAN PJC ADFERFS FERMT ND:l' 130810
07/14/00 N4ES RWO 04/15/14 MBMY PJC GLV C/O(04/04/14) AF1 ND: 50-029-21880-01
11/21/13 PKR 273 RWO 04/30/14 JNLIJMU PERF CORRECTIONS SEC 21,T11N,R12E,731'FNL&1182'FEL
01/30114 NORDIC I CTDSTIDETRACK(W-18A) 01/06/15 RCT/JMU GLV CIO(01/03/15)
03/03/14 I MW PJC;PEKES(02/26/14) I BP Exploration(Alaska)
1111 •
0 o m
c
m r c .3 °)v us
m 0 co m ma) •00 `�' 0 3 m C) m m m
- i .0 .D Y a E _ in Cl) .
0 _a 03 0O 03 03 E. 0 = O V CO .0 li 00 .33 O
LL O LL N LL LL 0) o a 3 .` O LL LL Er-
13
i
v - fir) S> or. oY 0 ai c o > c+n v v .,- c3
a> ¢ C Q . Q 0 0 O L � c b o Q ¢ o Q
a.
� � z00 � 3 � foo a) , wE c 3 ° 0
2 o. 2 721, 2 o Orn 5 L E � o � a
r''' ai i .E -�,�,, CDi IT r0o caix `t :? Q.
o C 0 O O 0 . N +- Cu 03 'x' m � o � o -0 0
N-
0-r 3 3 aU 0- a a) COca
m a v > 0. • 0. c aN--
7
7 ' 0 7 0 > > '� CO O i G 3 7 co 0. i
U) pr>= 6 U) F- U) cU) a; _ U 0 m a) m to , (n U)
c o
�(� 03 Ci- �� c lQ F 'o ccoco Z 3 N C� Cr)a C 0
to c c ra F c U lS ii a) 3 y a O (.41 a r m
ui •o a 0 0 •�.) i m 3 .n m C4 O ori c ui ix)
Q (�„ ' 7 c: 0 r a) r 0 Cl)rNs a)T-- C C y = N- .a U - r 0 r 0 0 r C
r < > m ° m •0 > 'uu)i c rnc4 O -E)
v 3 `' 7
E a N N
02) , a) ow � O a) ° m0 a) ¢ CLI 3atDc N ao0 a) cw0a4) c
,..„Cl.
' ° 21— � �y � � ° v- ° a) w m Et c0v o � co � � c'
n . O o o F- cn 3 aZ 'n � . � _ YU .. ci) � r o
-- Cdc) a`n o Q °: C .°-: >»:: U CC = w E CI- 3 Z a; °� 5 a; 0
W e** 0 = r 2 0 = � 3 J = O co 0 N 0 m U) '0 0) 0 0 D 0 � C 0 _
O me 0a 0co0 cO >. 3 as 0. (aa � Nr OF- OF- oO
> co— a = - ao cico- aao� E a0 c air E ba aoUaoU 7ao'S
0 m ' 7 E m O _ 7 c 0 a E 0 r 0 co00 .0 r N C
, � a am _ ix _ a _ U) 0 L a - 2 o 0op 0 _ Q __ Q o'.._ u_
a) . a a) o a) a) o m .-' `- E cc,) m • 0 • U a)
0. Ss C o 0 � r: �r r--• r c a 3 _m ? •< c :o a Z,-0 ,- . ?> r; -- . � r.:
I0 -iii 0 _ C a .ar r ^'' 7 ..+ ' r ) = m C = C .)) O > m 0 W +' ' �' 0 +'
y+ E r IQ O c a) o rm ' O a- m m o a . a) $ c c 3 C 7
C -E7 -El".._ C Ni- f. E < 0)' OJ U = a) = L _ to - LC) -' c[)
...
Ai r O F0 Q) O O r o e- rt,O In d = _ C .0 * Q a' C \ j '� r O r O O r O
E Lo d C C U) c O - C c ct
3 o N .O `C - .N- - * c U) C V) 0.E
m u) No � Q 6 E a E a E - a) 7-": ° 5 0)z a) Z D E
0 ti)r O O O C >_ m 0) 20 n > 0 C co • ( 0 0 Cu 0 ' 0 0
I- sr) F- w _ ,- F 4... or :. = 73C) a -0 cp„ r :rm CO r CO EF- 4 'F- " I- I- ,F
0 0 r w 0. 7 7 7 7 ' E m C Q) .0)
h. 0 y '_ 7 Tu 7 Z 7
> c Ir O ? c > C . c C m a C .o 3 N c c `�j c w > c'
U) '� U) C co c U) c c D _oce � Y 0.=-3D .0 E ca .-� � U) c U) c -c U) c
LLI
I-
N r r r r r r N r N.
r r r r r r r r r r
o
S.‘...1
0 N N Cr) CO 'V N 1 CO
> r r r r r r r r r ''
F- 1 i in in iin u� in in to in
0
Q
• •
r
II) co
O
• ce O 1
igco re
3 c 3
o O
:o c :o a
< c < E
g V g V
• a �t o
ink cno
C7)UCA Q
Cm C �
w rn t' g
0 ..6d m
r " r E
R N V E a)
7 0-
0 TD C -aem fns
a. >.rn rn ,v_
ru
73) r 7 = 0 L.
3 0 O i
00 > c N
_O
{ dW O
0 � E
r r
N CD Nti >
C E 7
Q
0 r O • O N
++ Q' td .O a)
E E Q) 2 7
J _
O w-N
ch O
O
1- : h- o .f 3 Y u 17
°' a) c 2 J0 o > 3 U a
. co c‘5 17 o .f., LS) = 0 = x
a)
JU '_ U Cnaz - C)
N. r---
O
o O o o) co
1 `ti
f
Loepp, Victoria T (DOA)
From: Catron, Garry R(Wipro) <Garry.Catron@bp.com>
Sent: Thursday, September 24, 2015 1:29 PM
To: Loepp, Victoria T (DOA)
Cc: Douglas, David W (Wipro); Danielan; Ramos.Tania UOSS); Lastufka,Joseph N
Subject: RE: PBU W-18A(PTD 213-081) cid Stim and Cement Squeeze? 10-404(4/28/14
Follow Up Flag: Follow up
Flag Status: Completed
Victoria, " JAN 2 0 2016
The Cementing of the Liner and shooting of the Perforations was completed on 4/1/14 and were
reported on the Post-Rig Sidetrack Attachment to the 10-407 Received in your office 4/30/14. Since
the Acidizing of the Perforations was not reported on the 10-407, we submitted a 10-404 for this work
done on 4/2/14, also received in your office 4/30/14.
Since this is a Production Well, a 10-403 is waived per the Sundry Waiver Rules July 29, 2005.
If you need further clarification, please let me know.
Sincerely,
Garry Catron
PDC PE
907-564-4424
From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov]
Sent: Thursday, September 24, 2015 10:42 AM
To: Catron, Garry R (Wipro)
Subject: PBU W-18A(PTD 213-081)Acid Stim and Cement Squeeze? 10-404(4/28/14)
Gary, r --
This appears to be an acid stimulation and a liner, not sure where. Please clarify. A 10-403 should have been submitted
for this work.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil&Gas Conservation Commission
333 W.7th Ave
Anchorage,AK 99501
Work: (907)793-1247
Victoria.Loepn falaska.gov
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged
information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended
1
STATE OF ALASKA • '
OSKA OIL AND GAS CONSERVATION COMMISSION RECEIVED
ECG Y
REPORT OF SUNDRY WELL OPERATIONS APR 2 8 2014
1.Operations Abandon Li Repair Well V Plug Perforations LJ Perforate L......,; Other nH
Performed: Alter Casing Li Pull TubingL Stimulate-Frac Waiver '` Time Extensio ; 0GC ' _
Change Approved Program Li Operat.Shutdown Stimulate-Other El Re-enter Suspended Well o�l ac) t-
2.Operator 4.Well Class Before Work: 5. Permit to Drill Number:
Name: BP Exploration(Alaska), Inc Development Exploratory L 213-081-0
3.Address: P.O.Box 196612 StratigraphicJ Service 6 API Number:
Anchorage,AK 99519-6612 50-029-21880-01-00
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL0028263 PBU W-18A
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s):
PRUDHOE BAY, PRUDHOE OIL
11. Present Well Condition Summary:
Total Depth measured 11128 feet Plugs measured None feet
true vertical 9095.55 feet Junk measured None feet
Effective Depth measured 11078 feet Packer measured See Attachment feet
true vertical 9057.87 feet true vertical See Attachment feet
Casing Length Size MD TVD Burst Collapse
Structural None None None None None None
Conductor 80 20"91.5#H-40 28-108 28-108 1490 470
Surface 2630 13-3/8"68#L-80 33-2663 33-2662.93 5020 2260
Intermediate None None None None None None
Production 8975 9-5/8"47#NT8OS 28-9003 28-8687.26 6870 4760
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation depth Measured depth See Attachment feet
True Vertical depth See Attachment feet
Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment
Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer
None None None SSSV
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
10890'-10895'; 10950'-10955'.(Acid Stim&Cement Squeeze)
Treatment descriptions including volumes used and final pressure:
11 Bbls 12%HCL, 1450 psi.9.3 Bbls 12%HCL, 1 psi.9.7 Bbls SqeezeCrete,2443 psi.
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 0 0 0 0 0
Subsequent to operation: 1029 553 13 1242 779
14.Attachments: 15.Well Class after work:
Copies of Logs and Surveys Run Exploratory Development[L Service Stratigraphic Ej
Daily Report of Well Operations X 16.Well Status after work: Oil L✓; Gas Li WDSPL
GSTOR ❑ WINJ 7 WAG Li GINJ C SUSP Li SPLU
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Garry Catron Email Garry.Catron(a.BP.Com
Printed Name Garry Catron Title PDC PE
Signature .84, r- Phone 564-4424 Date 4/28/2014
UTI- i°/7-/l5
1.9A//‘ RBDMS)L OCT 0 5 2015
Form 10-404 Revised 10/2012 Submit Original Only
• •
a)
U
co
d
G L N
C.Y V
E U to
(o
rra
C.F- M m
Cl
N N
W a (LI
2 CO CO
N N N
(1) MNI-
E
v
CD
4.4
}I M cl
m t▪ WD N CO CO
N▪ N CO CO 00
cn O
co
•D a
c
co co
d ErcoC
CO CO CO0
ca
CC Et CC
a
d W W W
Q.YYY
Q Q Q
CL d d
E < < <
m CO co 00
Z r r r
U)
U)
Q.p p co 0 0 co 0 0
co co
t0 I� ti p Lc) Lo
7 4- N 0 0 0
U
CO 0 CA 0 0 0 0) 0 0
O) CA O N In CO CO
N r r r
CD � 0 0 0
co co O) (fl co N I"-
p CA (V N O Nr co co
p O CO N NI-
LO IC) O) CO CO O O O
O I-- O (fl (fl co co coco
O co O) co N CO CO
I 1 1 1 1 1 1 1 1
H
CO N CO CO CA
r r r CO
00 In N_ CO CO 'Cr N—
C M co N CO N N— CO
CD 00 O) CO CO
CD
pQ O N co co CO CO LO
O o 0 CO O O CO
O O COLOp
O O) N CO CO CO
CO (4513 11 . 11 . 1 .CD 2
M) c i N 1 N OD N M N CO CO
C 0CO
0
� J
CD LC)
Q O 000 p 02 O O
C) o
M OO F-- J M 00 00
Z �$
N N �$ CO *4t • * M N
( • CO V ti p N O
U Od N - wO) -
ou CO
N 7 N ! r , M M
N O CO
a".
CO O CO CO N- CO N- O CO
C CO IC) M O) (O (C) CO CO
OO
J N M N CO
Z
O
CA N LLI
O DO00
MorC[ ou_ ZZZ
O Z W W W O m m m
O Z Z Z_ [rD D D j
• Perforation Attachment,
ADL0028263
SW Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base ND Depth Top ND Depth Base
W-18A 4/1/2014 APF 10305 10335 8950.28 8947.98
W-18A 3/31/2014 APF 10335 10365 8947.98 8946.07
W-18A 3/29/2014 APF 10365 10395 8946.07 8944.46
W-18A 3/29/2014 APF 10540 10570 8926.83 8923.64
W-18A 3/28/2014 APF 10615 10640 8922.13 8922.71
W-18A 3/28/2014 APF 10640 10670 8922.71 8923.77
W-18A 3/28/2014 APF 10670 10700 8923.77 8925.52
W-18A 3/27/2014 APF 10875 10890 8950.35 8955.04
W-18A 3/27/2014 APF 10890 10895 8955.04 8956.71
W-18A 3/27/2014 APF 10895 10925 8956.71 8967.88
W-18A 3/25/2014 APF 10925 10950 8967.88 8978.82
W-18A 3/25/2014 APF 10950 10955 8978.82 8981.2
W-18A 3/24/2014 APF 10985 11000 8996.72 9005.32
AB ABANDONED MIR MECHANICAL ISOLATED REMOVED
APF ADD PERF MIS MECHANICAL ISOLATED
BPP BRIDGE PLUG PULLED MLK MECHANICAL LEAK
BPS BRIDGE PLUG SET OH OPEN HOLE
FCO OUT STC STRADDLE PACK,CLOSED
FIL FILL STO STRADDLE PACK, OPEN
SQF SQUEEZE FAILED SPS SAND PLUG SET
SQZ SQUEEZE SL SLOTTED LINER
PER PERF SPR SAND PLUG REMOVED
RPF REPERF
i
•
Daily Report of Well Operations
ADL0028263
CTU 8 w/ 1.5" CT. Scope; Liner Squeeze
2/25/2014 Rig Up . **job continued on WSR 02-26-14**
Continued from WSR 02-25-14 CTU 8 Scope; Liner Squeeze
RIH w/BHA; 1.69" ctc, dfcv, disco, crossover, two 1.5" stingers, crossover,1.75" (oal=
14.7') for a tag at 11056' ctm. Pickup to 11006' E (10993' M) Flag pipe white/brown.
Pooh. Make up 1.69" ctc, mha, kj, PDS GR/CCL (OAL= 11.04') to 4000' ctm. Circ 60/40
around. Rih taking returns 1:1 returns to White/Brown flag at 11010' E 11005' M. Log out
of hole at 40'/min. Flag pipe Red/ Blue stripes at 10789.8' E 10784' M. Continue logging
40'/min up to 8000' ctm. Pooh while keeping hole full with 60/40. Download data. Tool
turned off at 8541' uncorrected.
2/26/2014 **job continued on WSR 02-27-14**
Continued from WSR 02-26-14 CTU 8 Scope; Liner Squeeze
Check logging data. (+12'correction). RIH w/ BHA; 1.69"ctc, dfcv, disco, firing head,1.56"
x 5' HSD perf gun. (oal= 11.97') Tie into top shot and perforate 10890-10895. PUH to
8390 above liner. Attempt injection down CTBS, injectivity too low. (Phoned APE's,
decision made to add additional holes) Pooh. recovered ball. RIH w/ 1.69" ctc, dfcv, disco,
firing head,1.56"x 5' HSD pert gun. Tie into top shot and perforate 10950-10955'.PUH to
8390 above liner. Injectivity too low. Phoned APE. Decision made to pump acid. Pooh. All
shots fired, recovered ball. Cut 100' coil, inspected chains, replaced packoffs.
2/27/2014 ***Continued on WSR 02-28-14***
Continued from WSR 02-27-14 CTU 8 Scope; Liner Squeeze
RIH with BOT MHA/1.75"JSN tag TD 11063', PUH to 11000' and lay in 11 bbls 12% HCI.
Squeeze acid away followed with KCL overflush. Injection rate is .5 bpm at 1420 psi. RIH
while pumping KCL down coil, tag bottom at 11062' flush remaining acid from sump with
24 bbls of kcl. Start pooh. Freeze protect well with 40 bbls of 60/40 meth. RD. **job
2/28/2014 suspended due to incomplete cement testing, will return for cement squeeze**
CTU 8 w/ 1.5" CT Scope; Liner Squeeze
Rig Up. RIH with 1.5"x0.167' CTC, 1.5"x10' 2-stingers, 1.5"x0.67' BDN, 10.8' OAL.
Found some bad spots in coil worst spot 0.081 wall thickness. Blow down reel w/ N2 to
swap coil. «< RDMO.>>>
3/12/2014
CTU 8 w/ 1.5" CT Scope; Liner Squeeze
Found some bad spots in coil worst spot 0.081 wall thickness. Blow down reel w/ N2 to
3/13/2014 swap coil. «< RDMO.>>>
CTU#8 1.5" Coil (CV= 24.8 bbls) Job Objective: Cement Squeeze
MIRU, Pump 1.0" Drift Ball, Recovered Ball. Make up 1.5" Slim CTC, 2 stingers, 1.5"
BDJSN (11/16" ball)
3/14/2014 **Job Cont'd on 03-15-14 WSR**
CTU#8 1.5" Coil (CV=24.8) Job Objective: Cement Squeeze **Cont'd from 03-14-14**
Performed Injectivity Test, At minimum rate of.29 bpm. Could not keep below 1500#.
Call Well intervention engineer. Decision to pump 12% HCL.
Pumped 9.3 bbls acid (12% HCL). Injectivity post acid 0.9 bpm @ 1300 psi. Load CTBS
with 55 bbls diesel with 1% lube776. Rig up cementers. Begin batching 10 bbls pumpable
squeezecrete.
3/15/2014 **Job cont'd on 03-16-14 WSR**
•
•
Daily Report of Well Operations
ADL0028263
CTU#8 1.5" Coil (CV=24.8) Job Objective: Cement Squeeze
Performing QA/QC on Squeezecrete. Bullheaded a total of 9.7 bbls of Squeezecrete.
Pushed a total of 1.5 bbls behind pipe. Stepped pressure up to a final squeeze pressure
of 2500#over static baseline of 400#. Held squeeze for 90 minutes. Lost 57#.
Contaminate to PBTD and reverse out cement. Full bottoms up with 1% KCL. Lay in 10
bbls PowerVis across liner while POOH. Freeze protect. Trap 788 psi WHP. Pump 1" drift
ball through coil. Ball recovered. RDMO CTU.
«<Job Complete>>>
3/16/2014
CTU#8 1.5" Coil (CV=24.5) Job Objective: Drift, SCMT,Add perfs
3/22/2014 Travel to W-18. MIRU. Perform BOPE test.
CTU#8 1.5" Coil (CV=24.5) Job Objective: Drift, SCMT,Add perfs
Make up motor and 1.75" mill BHA, RIH for drift/tag. Ran down to 11067 CTM without
seeing any obstructions. Coil flag painted at 11012 CTM (40' after break over). POOH.
M/U Memory SCMT BHA(OAL: 36.63'), RIH. Logged up from flag at 30 fpm to 8400'
twice. Painted second 10935 CTM on second pass. POOH. Good data at surface, stand
by for decision from town. Pressure tested cement plug prior to perforating (1650 psi).
SCMT log showed a +24.7' correction making a corrected EOP lower flag 11024.03',
3/23/2014 corrected EOP upper flag 10923.58'
CTU#8 1.5" Coil (CV=24.5) Job Objective: Drift, SCMT,Add perfs
Make up perf gun #1, 15' 1.56" PJ1606, RIH, corrected depth and shot 10985-11000,
POOH. All shots fired. Ball recovered, trimmed 100.25' of pipe. Rih w/gun#2: 30' 1.56"
1606PJ to 9462' ctm. Sat down. Puh. Went right by. Started stacking out starting at
10362' ctm. Rih weight loss of about 7-9K . Pooh. Lay down unfired 30' gun. M/U clean
out bha w/ 1.75" JSN. RIH, tagged multiple bridges (sticky) in liner starting at 10101,
continued in hole to PBTD at 11064 CTMD, circulate bottoms up. Circulation continued on
3/24/2014 3-25-2014
CTU#8 1.5" Coil (CV=24.3 bbl) Job Objective: Drift, SCMT, Add perfs **Reference Log:
PDC dated 20-March-2014**
Continue circulating bottoms up. Dry drifted and tagged 11064 CTM. POOH. Rih w/
Gun#2: 1.56"x 30' 1606 PJ to a TD tag of 11063.7' ctm, Breakover at 11058.4' up. Retag
3 times. Solid tag. Corrected EIM to bottom shot of 11081.43'. Pulled up to bottom shot
depth of 10954.7'. Launch 1/2" aluminum ball. Gun#2 fired. Perforated 10925' -10955'.
Paint White/Red Flag 10954.7'E 10928' M) Corrected EOP 10917.54' Pooh. All shots
fired. 1/2" Ball recovered. Cut 100.69' Coil. Rehead. Rih w/Gun#3 1.56"x 30' 1606 PJ.
Gun #3 tagged hard at 10573, pressured up and set down twice, could not get down with
gun, POOH. Make up 1.69 motor w/ 1.75" diamond parabolic mill.
3/25/2014 ***Job in Progress***
CTU#8 1.5" Coil (CV=24.2 bbl) Job Objective: Drift, SCMT, Add perfs **Reference Log:
PDC dated 20-March-2014**
RIH w/ 1.75 diamond parabolic mill. Corrected at flag to 10834.66. Continued dry drift to
PBTD, tagged 11078, got weight back at 11072. Did not see any obstructions while
running in hole. Began milling, made 2 passes from 10000-11078 known tight spots from
previous runs. Pumped two gel pills (10 bbl) on each pass. Made one final down/up pass
from 8500' to TD. Pump 10 bbl gel sweep and chase to out of hole. Rih w/ PDS GR/CCL
to a TD of 11058' ctm. Log 40'/min up to 10900' ctm. Flag pipe Red/White 10900.3' E,
10898.5' M. Log 40'/min up to 8397.4' ctm. Pooh. Download data. +16' correction to
3/26/2014 Reference log.
•
Daily Report of Well Operations
ADL0028263
CTU#8 1.5" Coil (CV=24.1 bbl) Job Objective: Drift, SCMT, Add perfs **Reference Log:
PDC dated 20-March-2014'
PDS Log showed a +16' correction making corrected EOP at flag 10906.82
Make up perf gun#3 (10895-10925). RIH to flag, correct top shot at flag to 10912.61.
Shot 10895-10925. POOH. All shots fired. RIH w/ perf gun#4 (10875-10895). RIH,
correct top shot at flag to 10912.61. Shot 10875-10895. POOH. All shots fired. Trim
27.52' of CT, change packoff and perform chain inspection. Make up perf gun#5 (10,670-
3/27/2014 10,700) and RIH
CTU#8 1.5" Coil (CV=24 bbl) Job Objective: Drift, SCMT, Add Perfs **Ref Log PDC 20
March 2014**
Continue RIH w/ Perf gun #5 (10670-10700). RIH to PBTD 11,081.37', correct depth to
bottom shot at PBTD 10080.67'. PUH to 10,700' and perforate 10670-10700. PUH 30' to
place bottom shot depth at 10,670' paint yellow flag for gun#6 referrence.
3/28/2014 ***Job in Progress***
CTU#8 1.5" Coil (CV=24 bbl) Job Objective: Drift, SCMT, Add Perfs **Ref Log PDC 20
March 2014**
Continue RIH w/ Perf gun#5 (10670-10700). RIH to PBTD 11,081.37', correct depth to
bottom shot at PBTD 10080.67'. PUH to 10,700' and perforate 10670-10700. PUH 30' to
place bottom shot depth at 10,670' paint yellow flag for gun#6 referrence. Made up perf
gun#6 (10640-10670). RIH to flag and corrected to bottom shot at flag 10670.0, RIH,
PUH and shot 10640-10670. POOH. Make up pert gun#7 (10615-10640). RIH to flag
and correct to bottom shot 10665, PUH and shoot 10615-10640. POOH. Cut 50' of pipe,
re-install MHA, pull test/PT. Make up gun#8 (10540-10570). RIH.
3/28/2014 ***Job in Progress***
CTU#8 1.5" Coil (CV=24 bbl) Job Objective: Drift, SCMT, Add Perfs **Ref Log PDC 20
March 2014**
Continue RIH w/gun#8. Tag PBTD correct depth to 11081.37 corrected PBTD, subtract
0.70' to correct to bottom shot 11080.67'. PUH to bottom shot depth 10570', perforate
10540-10570. PUH to next bottom shot depth paint white flag at 10395' (bottom shot). FP
well with 15bbl 60/40. Make up perf gun#9 (10365-10395). RIH to flag and correct to top
shot at flag 10363.67, shot 10365-10395. POOH. While POOH there was an overpull and
WHP increase when the ct connector reached the deployment sleeve. Coil was able to go
back down and establish circulation, after which coil was freed and resumed POOH. Well
is freeze protected w/ 17 bbl of 60/40. This overpull is believed to still be a sheath of
cement from the remedial squeeze. Injection rate test performed: .3 bpm @ 1575 psi, .4
bpm reached frac pressure and pump was shut down. POOH R/D gun#9. Perform
weekly BOP test. Plan forward is to RIH w/a 1.69"Jet Blaster. Unable to get upper shear
high pt to pass. Romove BOP from well and do BOP test on back deck. Weekly BOP test
complete.
3/29/2014
CTU#8 1.5" Coil (CV=24 bbl) Job Objective: Drift, SCMT, Add Perfs **Ref Log PDC 20
March 2014**
Make up SLB 1.69"jet blaster BHA and inline high pressure filters. Jet liner top from 8500
to 9017, pump 10bbI gel pill to sweep. As gel hit nozzle pressure dropped from 3312 to
1566. Decision to POOH and inspect jetting BHA due to drastic pressure drop. On surface:
1.69"X .33'XO, 1.69"X 2.083' DOWNHOLE FILTER, 1.69"X 2.0' BLASTER SWIVEL,
1.69"X .275' DRIFT RING, 1.18"X .098' NOZZLE ****LEFT IN HOLE*****OAL OF FISH:
4.786', 1" MT BOX LOOKING UP. Plan forward to rih with motor and double mt pin.RIH
tagged 9484 and motor stalled. Chase down to TD seen two motor stalls. Pooh and
recovered all fish. MU SLB 1.69"jet blaster BHA. Begin Jetting from Liner top taking 500'
3/30/2014 bites down to 9784'.
• •
Daily Report of Well Operations
ADL0028263
CTU#8 1.5" Coil (CV=24 bbl) Job Objective: Drift, SCMT, Add Perfs**Ref Log PDC 20
March 2014**
Continue Jetting 2-3/8" liner with SLB 1.69" Jet Blaster with 5-6 bbl gel sweeps every 500'
down to 11060'. Chase final gel sweep out in 2-3/8" Liner from 11060 to liner top 8517 at
20fpm. Chase out in 3.5" TBG at 80fpm. MU memory CCL&GR BHA and logged the well
from 11064.9' to 8400.2'.POOH and correlated EOP @10407,17'. MU Gun#10 (10335-
10365). Drop 1/2" ball and perforate 10335-10365. RU Gun#11 (10305-10335).
3/31/2014 ***Job Continued on 4-1-2014***
CTU#8 1.5" Coil (CV=24 bbl) Job Objective: Drift, SCMT, Add Perfs **Ref Log PDC 20
March 2014**
RIH w/Gun#11 (10305-10335) Perforated 10305-10335. FP well to 2500' (22bb1)while
POOH. Stand by for Acid pumpers. RU Acid Pumpers. PT iron.
4/1/2014 RIH 1.75" JSN to acidize perfs
CTU#8 CV=23.8bbl Job objective:Acid Stimulation
Acid pumpers PT Iron -Good. Lay 4bbII NH4CL from Flag 11025 to 10000. Perform
injectivity test/flush remaining 16bbl NH4CL into perfs. Circ 15bbl HCL down to nozzle with
60/40 taking returns to tanks, close choke, RIH to flag, lay in HCL 1:1 up to 10000' and
bullhead/soak acid in attempt to establish injectivity. Injectivity improved after laying 4bbl
HCL at 0.3bpm. RIH @70fpm while injecting remaing 11 bbl of HCL at 0.5bpm. Effective Inj
rate —0.7bpm@880psi. Circulated remaining 43 bbl of HCI down to the nozzle while taking
returns. Choke closed and began reciprocating across perfs with HCI. First down pass
with HCI could not get down due to hydraulic forces in 2 3/8 LNR while pumping at .5 bpm,
pump was shut down and then able to continue RIH once pressure was bled off at the
choke. PUH @ 20 fpm while pumping .5 bpm, final WHP 677. Second down pass w/ HCI
at the nozzle, did not pump and did not take returns, final WHP 380 psi. Second up pass
with HCI, 23 fpm @ .5 bpm, final WHP 625. First down pass with HF @ 70 fpm not
pumping and not taking returns, final WHP 387 psi. First up pass with HF .5 bpm, 19 fpm,
final WHP 345. Second down pass with HF, able to pump .5 bpm while RIH @ 19fpm,
final WHP 335 psi. Second up pass w/ HF @ .5 bpm, 20 fpm, final WHP 308 psi.
Peformed step rate injection test, see log. Overflush 220bb1 NH4CL. Well FP w/55bb1 of
4/2/2014 60/40.
***WELL S/I ON ARRIVAL***(Post CTD)
SET WHIDDON CATCHER SUB @ 8,495' SLM
PULLED STA.#4 RK-DGLV @ 5,082' SLM (5,109' MD)
PULLED STA.#5 RK-DGLV @ 3,162' SLM (3,192' MD)
SET STA.#5 RK-LGLV(16/64" ports, 1,500#tro.) @ 3,192' MD
SET STA.#5 RK-OGLV(20/64" ports) @ 5,109' MD
PULLED WHIDDON CATCHER SUB @ 8,495' SLM
4/4/2014 ***WELL S/I ON DEPARTURE, JOB COMPLETE, PAD OP NOTIFIED***
ASRC TEST UNIT#2***Flowback post perforating***IL Well W-18, OL Well W-
23***Current Barriers IL SSV OL SSV, S/B For ASRC, BP, Double Valve Isolation,
4/5/2014 CH2MHILL, RU, PT***Continue on WSR 4/6/14
ASRC TEST UNIT#2***Flowback post perforating***IL Well W-18, OL Well W-
23***Current Barriers IL SSV OL SSV,RU, PT,SB for ASRC,SB for CH2MHILL ***Continue
4/6/2014 from WSR 4/5/14***Continue on WSR 4/7/14
ASRC TEST UNIT#2***Flowback post perforating***IL Well W-18, OL Well W-
23***Current Barriers IL SSV OL SSV,RU, PT, STBY for BP Equipment***Continue from
4/7/2014 WSR 4/6/14***Continue on WSR 4/8/14
ASRC TEST UNIT#2***Flowback post perforating***IL Well W-18, OL Well W-
23***Current Barriers IL SSV OL SSV, PT ,SB for BP, STBY for ASRC Equipment
4/8/2014 ***Continue from WSR 4/7/14***Continue on WSR 4/9/14
• •
Daily Report of Well Operations
ADL0028263
ASRC TEST UNIT#2***Flowback post perforating***IL Well W-18, OL Well W-
23***Current Barriers IL SSV, OL SSV,SB for BP,End SB for BP Schedule, STBY for
4/9/2014 ASRC Equipment***Continue from WSR 4/8/14***Continue on WSR 4/10/14
ASRC TEST UNIT#2***Flowback post perforating***IL Well W-18, OL Well W-
23***Current Barriers IL Handline,Vessel OL SSV,Swab,flow well***Continue from WSR
4/10/2014 4/9/14***Continue on WSR 4/11/14
ASRC TEST UNIT#2***Flowback post perforating***IL Well W-18, OL Well W-
23***Current Barriers IL Handline,Vessel OL SSV,Swab,flow well***Continue from WSR
4/11/2014 4/10/14***Continue on WSR 4/12/14
ASRC TEST UNIT#2***Flowback post perforating***IL Well W-18, OL Well W-
23***Current Barriers IL Handline,Vessel OL SSV,Swab***,flow well***Continue from WSR
4/12/2014 4/11/14***Continue on WSR 4/13/14
ASRC Test Unit 2***Flowback Post Perforation***IL Well W-18, OL Well W-23***Current
Well Barriers IL, Hardlline, vessel OL, SSV*** Flowing Well***Continue From WSR 4-12-
4/13/2014 2014***Continue on WSR 4-14-2014***
ASRC Test Unit 2***Flowback Post Perforation***IL Well W-18, OL Well W-23***Current
Well Barriers IL, Hardlline, vessel OL, SSV*** Flowing Well***Continue From WSR 4-13-
4/14/2014 2014***Continue on WSR 4-15-2014***
ASRC Test Unit 2***Flowback Post Perforation***IL Well W-18, OL Well W-23*** Current
Well Barriers IL, Hardlline, vessel OL, SSV*** Flowing Well*** Continue From WSR 4-14-
4/15/2014 2014***Continue on WSR 4-16-2014***
ASRC Test Unit 2***Flowback Post Perforation***IL Well W-18, OL Well W-23***Current
Well Barriers IL, Hardlline, vessel OL, SSV*** Flowing Well*** Continue From WSR 4-15-
4/16/2014 2014***Continue on WSR 4-17-2014***
ASRC Test Unit 2***Flowback Post Perforation***IL Well W-18, OL Well W-23***Current
Well Barriers IL, Hardlline, vessel OL, SSV*** Flowing Well, Begin 8hr test, RD ***
4/17/2014 Continue From WSR 4-16-2014***Continue on WSR 4-18-2014***
ASRC Test Unit 2***NWKO***IL W-18 OL W-23***RD complete,Begin unit
4/18/2014 move***Continue from WSR 4/17/14***Job complete
•
WB_ = 4 C1
1/16" W
W-1 8 A SAFETY NOTES WELL ANGLE>70° 10890'"**
WB_LFEAD= MC>=VOY
ACTUATOR= BAKER
3-1/2"CHROME TBG 8 MI SEE PG.2 FOR
I I PREVIOUS WELLBORE
NT1AL KB.ELE 82'
BF.---BEV= 54.34' / 2133' H3-1/2"HES X NP,D=2.813"
KOP 5177' 20"CONDUCTOR --I ?
Max Angle_= 100°r•1 10131'
Datum PM= 9244' GAS LFT MANDRELS
Datum TVD= 8800'SS ST MD ND DEV TYPE VLV LATCH FORT DATE
5 3192 3192 0 MMG DOME RK 16 04/04/14
13-3/8'CSG,72#,L-80 BTRS,D=12.347"--{ 2663' 4 5109 5109 8 MG SO RK 20 04/04/14
3-1/2"1BG,9.2#,13CR 85 JFE BEAR --1 4682' 3 6181 6108 30 WAG DMI' RK 0 11129113
2 7286 7103 23 MING DMY RIC 0 11129/13
XO TO 13CR 85 VAM TOP 1 8261 7996 24 MMG MY RIC 0 11/29/13
Minimum ID = 1.78" @ 8517' 1 8482' H3-1/2-PES XMP,D=2.813"
ALUMINUM BUSHING IN DEPLOY SLV
M8508' -9-5/8"X 3-1/2"FES TNT NKR,D=2.949"
TOC(10124/14) -I 8520' 8517' .1-2.70"DE}'LOY SLV w/SEAL BORE,D=2.25"
OA ALUMINUM BUSIHNG f)-8526',ID=1.78"
4
3-1/2'TBG,9.2#,13CR-85 VAM TOP, H 8601' �* ,► 8543' -13-1/2"FES X NP,D=2.813"
.0087 bpf,D=2.992' 0;►
� 8616' }-9-5/8"X 3-1/2"MOQUE OVERSHOT
3-1/2 TBG STUB(06/26/13) -{ 8604' 4 �+'
► 8629' -13-1/2"FES X NP,D=2.750'
-u,-
8638', iffjoa 1. H9-5/8"X 4-1/2"BKR SAB-3 NKR,D=3.875'
.0 ;II"
P 'P Lk 8660' }-3-1/2"I-ES X nw,D=2.750" BEHIND
. 1P
3-1/2"TBG STUB(07/04/00) -8671 8688' 3-1/2"BKR SEAL ASSEMBLY
DT LNR
0. w Io SEALS,D=3.001"
M, L'ik11,M4
or 8684' H9-5/8'X 4-1/2"BKR SAB-3 NKR,D=3.99"
TOP OF r LNR
-( 8736' � IP , 8732' }-(3-1/2"SWS NP,D=2.750"
`a ; 8753' H3-1/2"SWS NP,D=2.750' BEHIND
3-1/2'TBG,9.2#,L-80,.0087 bpf,D=2.992" 8765' CT LNR
. 8765' _-13-1/2"WLEG,D=2.992"
9-5/8"CSG,47#,NT-80S BUTT XO TO NSOC --1 8846' s I 8770' }-BM TT LOGS 03/11/93
r.4*•
# 8989' N 7"MARKER JOINT
9-5/8°CSG,47#,NT-80S,D=8.681" H 9003' . a11
3-1/2"MONOBORE WFPSTOCK(01/16/14) -1 9070'
PERFORATION SUMMARY .
4 p MLLOUT WIDOW(W-18A) 9070'-9077'
REF LOG: GRIMG+L ON XX/XX/XX
ANGLE AT TOPPEFF:°t 10305' 1+?k
w��
tNote:Refer to Production DB for historical pert data t`��. .44* „
SIZE SPF INTERVAL Opn/Sqz SHOT SOZ r4 T� .� � �*iw►.
1.56” 6 10305-10395 0 04/01/14 !frig. '4'1.44,4 �� PBTD 11078'
1.56" 6 10540-10570 0 04/01/14 ° ' �'
. .
1.56" 6 10615-10700 0 04/01/14 • `�.
1.56" 6 10875- 10955 0 04/01/14 j
1.56" 6 10890-10895 S 02/26/14 03/16/14IAMM Lf �� 144
1.56" 6 10950-10955 S 02126/14 03/16/14
1.56" 6 10985-11000 0 04/01/14 ►.w
2-318"LNR,4.7#,13CR HY DRL 511,.0039 bpf,D=1.995" -- 11125'
7'LNR,26#,L-80 U4S,.0383 bpf,ID=6.276" H 9550'
DATE REV BY COMMITS DATE REV BY C ONNIE3'tTS PRUDHOE BAY UNIT
11/28/88 1422E IMTIAL COMPLETION 03/03/14 MW PJC RIFFS(02/26/14) WELL W-18A
08105190 D-16 .FMO 03/19/14 JR PJC SOZ RERFS(03/17/14) F8 MiT No:"2130810
07114/00 N4ES RWO 04/01/14 ..DN PJC ADS AR No: 50-029-21880-01
11/21/13 PKR 273 IMO 04/15/14 MBM'PJC GLV C/O(04/04/14) SEC 21,T11 N,R12E,731'FN._&1182'Fa
01/30/14 NORDIC 1 CTDSTIDETRACK(W-18A)
01/30/14 PJC DRLG HO CORRECTIONS BP Exploration(Alaska)
2( r � J
Davies, Stephen F (DOA)
From: Lastufka, Joseph N [Joseph.Lastufka@bp.com]
Sent: Thursday, June 06, 2013 4:37 PM
To: Sperry, Nathan
Cc: Davies, Stephen F (DOA)
Subject: RE: PBU W-18A Permit to Drill Appliction
Steve,
The top location of 791' is a typo, please correct it to 731' FNL.
As for the GL elevation, the correct depth is 47.83'.
I apologize for the confusion, please let me know if you have any questions, and feel free to contact me if there are
discrepancies in the future.
Thanks!
Joe
From: Sperry, Nathan
Sent: Thursday, June 06, 2013 4:28 PM
To: Lastufka, Joseph N
Subject: Fw: PBU W-18A Permit to Drill Appliction
Hey Joe,
I can look at this on Monday. I thought you might want to be in the loop as well.
Sent using BlackBerry
From: Davies, Stephen F (DOA) [mailto:steve.davies(aalaska.gov]
Sent: Thursday, June 06, 2013 04:00 PM
To: Sperry, Nathan
Subject: PBU W-18A Permit to Drill Appliction
Nathan,
I have a couple of questions about this application:
The application says the surface location of the well is 791' FNL, but the W-18 well is located 731' FNL. I'm assuming
that 731' FNL is correct, but could you please confirm this? Or was the location re-surveyed?
Just curious, why don't the ground-level elevations on the application form and the proposed directional survey match
(52.88'vs 47.83')? Which is correct? I've noticed that this is a common problem--it occurs in many permit application
packages, but this 5' difference is significant.
Regards,
Steve Davies
1
Sr. Petroleum Geologist
Alaska Oil and Gas Conservation Commission (AOGCC)
Phone: 907-793-1224
Fax: 907-276-7542
2