Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-086MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, September 8, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC F-10C PRUDHOE BAY UNIT F-10C Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/08/2025 F-10C 50-029-20410-03-00 213-086-0 N SPT 7743 2130860 2250 246 2506 2385 2344 200 201 202 202 OTHER P Sully Sullivan 7/9/2025 two year MIT-T and MIT-TxIA(see related inspection) to 2250 per CO.736. this well has an IA with CMT to 4635ft. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT F-10C Inspection Date: Tubing OA Packer Depth 326 378 380 379IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS250709160423 BBL Pumped:1.6 BBL Returned:1.6 Monday, September 8, 2025 Page 1 of 1            REVISED Revised Barrels Pumped MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, August 5, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC F-10C PRUDHOE BAY UNIT F-10C Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 08/05/2025 F-10C 50-029-20410-03-00 213-086-0 N SPT 7743 2130860 2250 246 2506 2385 2344 200 201 202 202 OTHER P Sully Sullivan 7/9/2025 two year MIT-T and MIT-TxIA(see related inspection) to 2250 per CO.736. this well has an IA with CMT to 4635ft. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT F-10C Inspection Date: Tubing OA Packer Depth 326 378 380 379IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS250709160423 BBL Pumped:1.6 BBL Returned:1.6 Tuesday, August 5, 2025 Page 1 of 1          Well is 1-Oil producer CO 736 for IA remedial cement   MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, August 5, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC F-10C PRUDHOE BAY UNIT F-10C Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 08/05/2025 F-10C 50-029-20410-03-00 213-086-0 N SPT 7743 2130860 2250 220 2498 2414 2377 203 204 203 202 OTHER P Sully Sullivan 7/9/2025 two year MIT-TXIA and MIT-T(see related inspection) to 2250 per CO.736. this well has an IA with CMT to 4635ft. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT F-10C Inspection Date: Tubing OA Packer Depth 329 2489 2405 2367IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS250709161002 BBL Pumped:4.6 BBL Returned:4.7 Tuesday, August 5, 2025 Page 1 of 1              Well is 1-Oil producer CO 736 - IA remedial cement Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 06/09/2025 Mr. Jack Lau Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 06/09/2025. Dear Mr. Lau, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 06/09/2025. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki (4525) DN: cn=Oliver Sternicki (4525) Date: 2025.06.09 14:30:46 - 08'00' Oliver Sternicki (4525) Hilcorp North Slope LLC.Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-offReport of Sundry Operations (10-404)06/09/2025Well NamePTD #API #Initial top of cement (ft)Vol. of cement pumped (gal)Final top of cement (ft)Cement top off date Corrosion inhibitor (gal)Corrosion inhibitor/ sealant dateF-10C21308650029204100365/29/25F-29B2111475002921627026.25/29/25F-33A20816350029226400145/29/25F-3619519650029226310035/29/25F-39190141500292210100175/29/25F-44A2051615002922130012.55/29/25F-47B21007950029222320215/29/25L-2512231065002923772001.8813/31/24117/29/24L-2532230485002923758004.1201.13/31/24127/29/24L-2542230305002923752003.8321.23/31/24137/29/24L-2922230255002923751003.3301.33/31/24147/29/24N-282141275002923524006.8504.711/19/242212/28/24N-302141245002923523003.5330.311/17/243.512/28/24PAVE1-122309450029237670019.910/27/24PWDW3-221908150029236340014.810/27/24S-40120607850029233130015.31130.511/15/24412/28/24F-10C21308650029204100365/29/25 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-10C Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-086 50-029-20410-03-00 12088 Surface Intermediate Liner Liner Liner 9045 2648 9215 616 696 3542 11202 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9043 30 - 2678 29 - 9244 8744 - 9360 8757 - 9453 8541 - 12083 30 - 2678 29 - 8414 7965 - 8520 7976 - 8620 7785 - 9045 8535, 12032 2670 4760 7020 10530 11780 11202 5380 6870 8160 10160 11200 10410 - 12030 4-1/2" 12.6# 13cr80, L-80 28 - 8573, 8701 - 8805 9047 - 9045 Conductor 80 20" x 30" 31 - 111 31 - 111 4-1/2" Baker S3 Packer 8701, 7926 8493, 8701 7743, 7926 Aras Worthington for Torin Roschinger Operations Manager Kirsty Glasheen kirsty.glasheen@hilcorp.com 907-564-5258 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 28 - 7814, 7926 - 8019 N/A N/A 206 745 20556 8498 14 58 750 1750 1100 220 323-516 13b. Pools active after work:Prudhoe Oil 4-1/2" Baker Packer 8493, 7743 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed By Grace Christianson at 12:29 pm, Jan 19, 2024 Digitally signed by Aras Worthington (4643) DN: cn=Aras Worthington (4643) Date: 2024.01.19 10:37:40 -09'00' Aras Worthington (4643) WCB 12-4-2024 RBDMS JSB 012524 DSR-1/26/24 ACTIVITY DATE SUMMARY 9/28/2023 ***WELL FLOWING ON ARRIVAL*** HES 759 R/U ***CONT WSR ON 09/29/2023*** 9/29/2023 ***CONT WSR FROM 09/28/2023*** RAN IN W/ 3.83" G.RING DRIFTED TO DREAM CATCHER @ 2,105' MD. PULLED DREAM CATCHER @ 2,105' MD. RAN 3.80" G. RING TO LTP @ 8,534' MD RAN 1.80" CENT, 1.25" x 5' P.BAILER DRIFTED TO 10,007' SLM DEVIATED OUT ***WELL LEFT S/I ON DEPARTURE. CONTACT PAD OPERATOR ON STATUS OF WELL*** 1/10/2024 LRS CTU #1 1.5" Blue Coil, Job Objective: Plug, Perf MIRU Coil. Make up 1.75" DJN drift. Tag obstruction at 10850'. Jet through debris to 11500'. SD pump. PU to 10,500' and dry drift to 11,500. POH. MU and RIH w/ 1.69" BHA CTC, MHA, HAL GR/CCL, 1.75" nozzle OAL 10.34'. Load well w/ 135 bbls 1% KCL w/ SafeLube, and 35 bbls diesel @ 4.2 bpm final pump pressure 1300 psi. Log up from 11,506' @ 50 fpm. Paint EOP flag @ 11,000'. Continue logging up to 10,000'. POH. ***Cont on 1/11/23*** 1/11/2024 CTU LRS #1 1.5" Blue Coil Job Scope: Plug and Perf Coninue POH after memory GR/CCL and flagging pipe @ 11,000' EOP. Good data. RIH w/ 1.69" CTC, MHA , and 1.71" OD CIBP. OAL 8.2' to flag and correct depth. Set CIBP MOE at 11202' Corr. PUH and repaint flag at 10100'. Freeze protect well and go to standby for weather. *** Job In progress. Go on weather ticket*** 1/14/2024 CTU LRS #1 1.5" Blue Coil Job Scope: Plug and Perf RIg up after weather delay. Well on Vac. Fill well w/ 10 bbls 60/40. Circ across top and establish loss rate ~1 bph. Flow check well 10 mins - no flow. Resume continuous hole fill and start trip sheet. PJSM and well control drill. Confirm safety joint connection compatible w/ guns and FOSV wrench in hand. MU 240' TCP gun assy and make up to coil. Stab on well. Test QTS. RIH w/ 1.69" OD CTC, MHA, firing head, 240' 1.56" millenium guns, and bull plug OAL 252.9'. Tagging top of liner @ 8529' CTM. Attempt to work thru. ***Cont on 1/15/24** 1/15/2024 CTU LRS #1 1.5" Blue Coil Job Scope: Plug and Perf ***Cont from 1/14/24*** Continue to attempt to work past top of liner @ 8529' CTM by surging and dumping backside pressure without progress or sticking the guns. PUH 1000' and RBIH. Unable to work thru TOL. POH filed pipe displacement down backside w/ 20 bbls 60/40 (Calc volume 18 bbls). Flow check - good. Start trip sheet and hole fill across the top. LD perf guns. Obvious mark on bullnose of liner top packer. MU bow-spring centralizer and bullnose to bttm gun. Deploy and RIH to flag. Correct depth at flag. Perforate interval 10410' - 10650'. PUH keeping hole full. Peforrm No flow check. Unstab from lubricator and break off at Firing head. Ball recovered. Undeploy guns. Perform Weekly BOP test. ***Job Complete*** Daily Report of Well Operations PBU F-10C Set CIBP MOE at 11202' Corr g Perforate interval 10410' - 10650'. 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU F-10C Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-086 50-029-20410-03-00 341J ADL 0028280 12088 Surface Intermediate Liner Liner Liner 9045 2648 9215 616 696 3542 12032 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9045 30 - 2678 29 - 9244 8744 - 9360 8757 - 9453 8541 - 12083 2320 30 - 2678 29 - 8414 7965 - 8520 7976 - 8620 7785 - 9045 8535, 12032 2670 4760 7020 10530 11780 None 5380 6870 8160 10160 11200 10700 - 12030 4-1/2" 12.6# 13cr80, L-80 28 - 8573, 8701 - 88059048 - 9045 Conductor 80 20" x 30" 31 - 111 31 - 111 4-1/2" Baker S3 Packer 4-1/2" Baker Packer 8493, 7743 8701, 7926 Date: Torin Roschinger Operations Manager Kirsty Glasheen kirsty.glasheen@hilcorp.com 907-564-5258 PRUDHOE BAY 10/1/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 8:58 am, Sep 12, 2023 323-516 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.09.11 14:17:32 -08'00' Torin Roschinger (4662) Perforate DSR-9/12/23MGR22SEP23 10-404 MDG 9/13/2023 *&:JLC 9/22/2023 09/22/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.09.22 12:59:16 -08'00' RBDMS JSB 092223 CIBP & Ext AdPerf Well: F-10C Well Name:F-10C API Number:50-029-20410-03 Current Status:Operable – Cycle Producer Pad:F-Pad Estimated Start Date:10/01/2023 Rig:CTU Reg. Approval Req’d?10-403 & 10-404 Date Reg. Approval Rec’vd: Regulatory Contact:Abbie Barker Permit to Drill Number:213-086 First Call Engineer:Kirsty Glasheen Contact:907-350-4310 Current Bottom Hole Pressure:3200 psi Offset well estimate. MPSP:2320 psi (BHP - .1psi/ft gas gradient) Max Dev:94 deg @ 11,040’ MD Min ID:1.81” ID 45KB LTP at 8,542’ MD Brief Well Summary: F-10C is currently a cycle well at F-Pad. The well had a mill plug job done in 2021 that is now played out, so we would like to isolate the lower three perf stages. New perforations will be shot that will be commingled with the upper two perf sets. The upper perfs are thought to be low productivity and low gas rate. There is potentially some CIBP/retainer debris at the LTP that will need to be removed before the CIBP/add perfs can be executed. Objective: The purpose of this procedure is to isolate all perforations below 11250’ MD and add ~240’ of uphole perforations using extended perforation deployment. NOTES: x In July 2021, after an IA cement job, CT milled and pushed a retainer and CIBP to the LTP. They were not able to recover all debris. A dream catcher was set on 7/21/23 and pulled on 8/25/21. The catcher recovered chunk of mesh, milled cement retainer, and several small pieced of metal. The dreamcatcher was reset and pulled on 11/6/22. Additional CBP debris was recovered. A third dreamcatcher was set on 11/7/22. On 12/26/22, the dreamcatcher was pulled and recovered multiple slips from the CIBP. The dreamcatcher was reset and on 2/28/23 it was pulled with no debris inside the catcher. There is currently a dreamcatcher in the hole. It is unknown how much (if any) debris is remaining at the LTP. x Needs 1.5” CT. Procedure: Slickline: 1.Pull dreamcatcher. 2.Drift to deviation for 2-3/8” CIBP (1.75”) to confirm LTP is free of CBP debris. If debris is encountered, attempt to recover. The goal is to create a clear path for coil through the LTP. Coil Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perf guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after o isolate all perforations below 11250’ MD and add ~240’ of uphole perforations using extended perforation deployment. CIBP & Ext AdPerf Well: F-10C perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 1. MIRU 1.5” CTU 2. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 3. Review pre-coil SL drift AWGRS. There is potentially CIBP/retainer debris at the LTP. If debris was found by SL and not able to be recovered, attempt to recover. We would like to maintain LTP integrity, so be conservative with recovery method. 4. RIH with GR/CCL & 1.8” nozzle to ~11,250’. PUH and paint flag for plug/perfs depths. 5. POOH. 6. Bullhead ~207 bbls 1% KCL/SW down tubing. Max tubing pressure 2500 psi. (This step can be performed any time before prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.Recommended to complete well kill prior to setting CIBP as we believe the perforations above 11250’ MD are low productivity.) a. Wellbore volume to top perf = 138 bbls b. 4-1/2” Tubing – 8534’ X 0.0232bpf = 130 bbls c. 2-3/8” Liner – 12032’ X 0.0039 = 47 bbl 7. MU 2-3/8” CIBP. RIH and set at ~11,200’. a. Tag CIBP to confirm good set. b. Adjust plug depth slightly at WSL discretion. CIBP was previously set at 11,100’ MD. Avoid setting at collars and previous plug depth. 8. POOH. Prepare for deployment of TCP guns. 9. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 10.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 11.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule *1.56” guns were used to estimate gun weight for this job (5 ppf) *Tie-In Log: PDS Coil Flag 01/08/2016. This log is on depth with reference log. No depth shift required. Perf Interval Perf Length Gun Length Weight of Gun (lbs) 10410’-10650’ MD 240’240’1200 lbs 12. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 13. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. Make up PCE. -mgr CIBP & Ext AdPerf Well: F-10C 14. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 15. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 16. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 17. RDMO. Slickline: 1. Reset dreamcatcher at 2105’ MD if remaining plug debris believed to be downhole. Slickline (pending): 1. Pull dreamcatcher if set. Attachments: x Current Wellbore Schematic x Proposed Wellbore Schematic x CT BOPE Schematic x Standing Orders x Equipment Layout Diagram x Tie In Log CIBP & Ext AdPerf Well: F-10C Figure 1: Current Schematic CIBP & Ext AdPerf Well: F-10C Figure 2: Proposed Schematic CIBP ~11,200’ MD PROPOSED C C C Perf:10,410’ – 10,650’ CIBP & Ext AdPerf Well: F-10C Figure 3: BOP Schematic CIBP & Ext AdPerf Well: F-10C Figure 4: Extended Perforating Standing Orders CIBP & Ext AdPerf Well: F-10C Figure 5: Extended Perforating Equipment Layout CIBP & Ext AdPerf Well: F-10C Figure 6: Tie-In Log Header CIBP & Ext AdPerf Well: F-10C Figure 7: Perf Tie-In Perf 10,410- 10,650’ MD Hilcorp North Slope, LLC Hilcorp North Slope, LLC Changes to Approved Work Over Sundry Procedure Date: September, 11, 2023 Subject: Changes to Approved Sundry Procedure for Well F-10C Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HNS Prepared By (Initials) HNS Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Asset Team Operations Manager Date Prepared: First Call Operations Engineer Date MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, September 12, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Brian Bixby P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC F-10C PRUDHOE BAY UNIT F-10C Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/12/2023 F-10C 50-029-20410-03-00 213-086-0 N SPT 7743 2130860 2250 285 2493 2354 2312 105 105 105 106 OTHER P Brian Bixby 7/19/2023 MIT-T as per CO. 736 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT F-10C Inspection Date: Tubing OA Packer Depth 347 367 372 371IA 45 Min 60 Min Rel Insp Num: Insp Num:mitBDB230720033428 BBL Pumped:1.4 BBL Returned:1.4 Tuesday, September 12, 2023 Page 1 of 1 9 9 9 9 9 9 9 9 9 9 9 2LOSURGXFHU MIT-T James B. Regg Digitally signed by James B. Regg Date: 2023.09.12 12:24:09 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, September 12, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Brian Bixby P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC F-10C PRUDHOE BAY UNIT F-10C Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/12/2023 F-10C 50-029-20410-03-00 213-086-0 N SPT 7743 2130860 2250 750 2471 2460 2450 105 112 112 112 OTHER P Brian Bixby 7/19/2023 MIT-TxIA as per CO. 736 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT F-10C Inspection Date: Tubing OA Packer Depth 500 2473 2363 2316IA 45 Min 60 Min Rel Insp Num: Insp Num:mitBDB230720033734 BBL Pumped:3.8 BBL Returned:3.8 Tuesday, September 12, 2023 Page 1 of 1 9 9 9 9 9 99 9 99 9 99 9 9 9 MIT-TxIA James B. Regg Digitally signed by James B. Regg Date: 2023.09.12 12:26:06 -08'00' MEMORANDUM TO: Jim Regg 3 P.I. Supervisor ( � � ����� ��ZI FROM: Adam Earl Petroleum Inspector Well Name PRUDHOE BAY UNIT F - IOC Insp Num: mitAGE210719140119 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday, August 6, 2021 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC F-1 OC PRUDHOE BAY UNIT F - IOC Sre: Inspector Reviewed By: P.I. Supry Comm API Well Number 50-029-20410-03-00 Inspector Name: Adam Earl Permit Number: 213-086-0 Inspection Date: 7/12/2021 Notes: CMIT T & IA tested as per Sundry 320-365 to 1500 pre pop V Friday, August 6, 2021 Page I of I Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min --- Well F -IOC Type Inj N -TVD 7743 - Tubing, 165 1982 - 1949 1935 - PTD 2130860 rt 'Type Test, SPT '.Test psi 1936 IA 8 1989_. 1882 1839 -- BBL Pumped: - 5.3 BB _-- L Returned:-' -- -- � 5 1- OA - � 100 100 - - - too,100, I 100 - - - _p Interval OTHER P/F P _-� Notes: CMIT T & IA tested as per Sundry 320-365 to 1500 pre pop V Friday, August 6, 2021 Page I of I MEMORANDUM TO: Jim Regg P.I. Supervisor \ FROM: Adam Earl Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday, August 6, 2021 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC F -10C PRUDHOE BAY UNIT F-1 OC Src: Inspector Reviewed By P.I. Supry Comm Well Name PRUDHOE BAY UNIT F-1 OC API Well Number 50-029-20410-03-00 Inspector Name: Adam Earl Permit Number: 213-086-0 Inspection Date: 7/12/2021 Insp Num: mitAGE210719131412 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min F -IOC Type Inj N TVD g --�-- 1921 - 1904 - - tozs_ � --- — —'. Well 7743 Tubin 127 1977 - PTD z13os6 To ype Test SPT Test psi Isoo Ip loll 1013. loob . BBL Pumped: 1.4 BBL Returned - 1.4 OA loo , loo loo . too - Interval � OTHER P/F P � -- Notes: MIT -T tested as per Sundry 320-365 to 1500psi ✓ Friday, August 6, 2021 Page 1 of 1 Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:213-086 6.50-029-20410-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12088 12032 9044 8493, 8701 8535 None 7743, 7926 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural 80 20" x 30" 31 - 111 31 - 111 Conductor 2648 13-3/8" 30 - 2678 30 - 2678 5380 2670 Surface 9215 9-5/8" 29 - 9244 29 - 8414 6870 4760 Intermediate 616 7" 8744 - 9360 7965 - 8520 8160 7020 Production 696 3-1/2" x 3-3/16" 8757 - 9453 7976 - 8620 Perforation Depth: Measured depth: 10700 - 12030 feet True vertical depth:9048 - 9045 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13cr80 / L80 8493 7743Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S-3 Perm Packer Liner 3542 2-3/8" 8541 - 12083 7785 - 9045 11200 11780 12. Stimulation or cement squeeze summary: Intervals treated (measured): 229-bbls 15.8-ppg Class G Cement. Final treating pressure = 1252-psi. Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 2302002121127952 Well Not Online Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Aras Worthington Aras.Worthington@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.564.4763 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9045 Sundry Number or N/A if C.O. Exempt: 320-299, 320-365 4-1/2" Baker Packer 8701 7926 Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program 5 IA from 4395' - 8493 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well5 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028280 PBU F-10C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Wellhead Repair, IA Cement, Mill CIBP 28 - 8573 / 8701 - 8805 28 - 7814 / 7926 - 8019 By Meredith Guhl at 1:38 pm, Jul 23, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.07.23 13:20:52 -08'00' Stan Golis (880) MGR27JUL2021 DSR-7/23/21 RBDMS HEW 7/26/2021 ACTIVITY DATE SUMMARY 7/30/2020 T/I/O = SSV/750/130. Temp = SI. Assist w/ PMI testing (Pre SH weld). AL SI @ casing valve (1500 psi). 30% LEL's @ the 07:30 position on the SH. Bled the OAP from 130 psi to 0 psi in 25 minutes (mostly gas). Maintained and open OA bleed. Re- sniffed SH @ 0% LEL's. Assisted Northern Solutions tech w/ PMI testing. FWPs = SSV/750/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 11:30 8/1/2020 T/I/O = SSV/540/50. Temp = SI. IA & OA FL. IA FL @ 1596'. OA FL @ near surface. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:20 8/2/2020 T/I/O= 200/740/50 LRS Unit 72 Circulate Gas From IA (PRE STARTING HEAD WELDING) Pumped 400 bbls of crude into the IA while taking TBG returns to the FL. Final T/I/O= 172/600/60. 8/3/2020 T/I/O=SI/600/50. Pre Braden Head Weld, Bleed OA to 0 psi, RD Comp OA Blind, Remove 3" McEvoy VR plug, and RU integral and block valve. ***Job Complete. Final WHP's SI/600/0. 8/4/2020 UT Inspection Pre Starting Head Weld Inspection with GC1 contract Kakivik UT inspection tech on target welding area showed full thickness (0.52" average - target area is 13-3/8" casing 0.514" wall thickness). 8/5/2020 Objective: Clean wellhead and remove RG-2401 in preparation for starting head weld. Steam clean starting head and conductor flutes for 2hrs. Removed RG-2401 down to 20" bell nipple (~1ft below target welding location). 8/7/2020 T/I/O = 330/550/80. Temp = SI. Circ in N2 cap on OA and push down IA FL w/ N2 (Pre welding). TBG FL @ near surface. IA FL @ near surface. OA FL @ near surface. Grease crew service WV, AL CV and AL lateral. Bled TP to BT from 330 psi to 270 psi in 15 min (Gas to fluid, 1.4 bbls). Bled IAP to BT from 550 psi to 520 psi in 30 min (Gas to fluid, 4.5 bbls). Opened WV and bled TP to CLP (180 psi). Bled IAP to F-30 production from 550 psi to 530 psi in 3 hrs. Bled OAP to 0 psi (Gas). Circ'd N2 in OA taking returns to BT using 20' hose. OA FL @ 20'. Final WHPs = 190/530/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30 8/7/2020 T/I/O = 200/530/20. Temp = SI. CMIT-TxIA (FAILED)/ MIT-T to 2500 psi (PASSED), LLR if either fails. ALP = 350 psi, SI @ CV & LV. TBG FL @ near surface, IA FL @ surface. Unable to reach test pressure for CMIT-TxIA, established LLR TxIA of 0.27 BPM @ 600/550. TP & IAP equalized to 540 psi. Pumped 1.03 bbls diesel to reach test pressure of 2502 psi, IAP unchanged. TP decreased 32 psi in 1st 15 minutes, TP decreased 12 psi in 2nd 15 minutes for a total loss of 44 psi in 30 minutes. Bled TP from 2458 psi to 200 psi, returned 1.4 bbls. Monitored while rigging down. Tag hung. Final WHPs = 230/540/20. SV, WV, SSV = C. MV = O. IA, OA = OTG. 23:59 8/24/2020 T/I/O=900/600/100 Temp=SI Assist Eline (LEAK DETECTION LOG) Pumped 75 bbls 80* crude down IA while ELine logged. Eline in control of well per LRS departure. FWHP's=800/550/100 IA,OA=OTG Daily Report of Well Operations PBU F-10C Daily Report of Well Operations PBU F-10C 8/24/2020 ***WELL S/I ON ARRIVAL*** (HES E-Line STP LDL) PERFORM BASELINE PASS FROM SURFACE TO 8516' MD. LRS PUMPED 50 BBL'S OF CRUDE DOWN IA - 5 BPM @ 1000 PSI. REDUCE RATE TO 0.5 BPM FOR LOGGING. LOG OOH AT 110 FT/MIN. IDENTIFY PC LEAK AT ~ 5725' MD (confirm with repeat passes). LOG CORRELATED TO TUBING TALLY DATED 13-JUN-206. ***JOB COMPLETE ON 25-AUG-2020*** 8/26/2020 ***Cost place holder F pad FP trucking cost*** 11/29/2020 ***WELL S/I ON ARRIVAL*** PULLED P-PRONG FROM 8519' MD PULLED STATION 3, 1.5" RK-OGLV FROM 5908' MD PULLED STATION 4, 1.5" RK-LGLV FROM 3293' MD SET STATION 4 1.5" RK-DGLV @ 3293' MD SET STATION 3 1.5" RK-DGLV @ 5908' MD PULLED PX-PLUG BODY FROM X NIP @ 8527' MD. ***WELL LEFT S/I ON DEPARTURE*** 3/10/2021 CTU #9 - 1.50" Coil Job Objective: Mill CIBP MIRU CTU. Make up 1.69" Motor with Tempress Hydropull and 1.75" junkmill and RIH. Dry tagged CIBP at 11100. Milled CIBP and pushed to 11889, bit stuck numerous times in last set of perfs. Continue milling and pushing CIBP. ...Job Continued on 3/11/2021... 3/11/2021 CTU #9 - 1.50" Coil Job Objective: Mill CIBP Continue milling/pushing CIBP to 12032 CTMD. Numerous stalls and overpulls in the last 150'. POOH and had overpulls all the way to the liner top packer. OOH with mill and there is significant wear as well as a piece of CIBP slip in the water course. Freeze protect well with 4 bbl of 60/40 and 34bbl of diesel. Pad operator notified of well status. RDMO. ****DO NOT ENTER LINER WITHOUT RUNNING VJB OR BAILER FIRST*** ***Job Complete*** 6/26/2021 T/I/O = VAC/1770/80. Temp = SI. T & IA FL (CT request). ALP = 1770 psi, SI @ CV. 0900 OA CV replaced w/ 2" block valve. T FL @ 1070' (17 bbls). IA FL @ 2460' (132 bbls). SV, WV, SSV = C. MV = O. IA, OA = OTG. 01:00 6/27/2021 ***WELL SHUT IN ON ARRIVAL*** (JOB SCOPE: IA CEMENT PREP) RAN 3.70" DMY WRP DRIFT TO 8530' WITH NO ISSUES. RAN 4-1/2" NORTHERN MAGNUM COMPOSITE BRIDGE PLUG. CORRELATE TO TBG TALLY 6/13/2006. ATTEMPT TO SET CBP ME AT 8467' (TOP OF PLUG AT 8466') BUT DID NOT SHEAR OFF. APPEARS SETTING TOOL DID NOT FULLY STROKE. HAVE LRS PRESSURE UP ON PLUG TO 2000psi, ABLE TO GET UP TO TEST PRESSURE BUT FALLS OFF. BREAK WEAKPOINT TO GET FREE. POOH RECOVERING ALL CABLE. LIH: Rope Socket, Weight Bar, CCL, Baker 10 Setting Tool, Setting Slv & Northern CBP. ( 1" Fish Neck. Top of Fish @ 8448', OAL= 19.92' ) ***RIG DOWN ELINE / JOB NOT COMPLETE*** Daily Report of Well Operations PBU F-10C 6/27/2021 T/I/O=vac/1280/0 Assist E-Line w/MIT T (Cement Sqz) Attempt to pressure up on plug with 19 bbls crude. Plug would not hold pressure. FWHPs=0/1280/0 6/28/2021 ***WELL S/I ON ARRIVAL*** (cement squeeze) PLANTED BAIT SUB W/ A GUTTED 1 3/8" JD ON FISH @ 8,422' SLM JARRED ON TOOLSTRING FOR 1 HOUR & 10 MINUTES BEFORE JD LET GO PULLED TOOLSTRING FROM 8,422' SLM W/ WEATHERFORD RELEASABLE OVERSHOT PERFORMED A GOOD 5 MINUTE PRESSURE TEST TO 2,500PSI (2,750psi max applied) ON CBP ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF STATUS*** 6/29/2021 ***WELL S/I ON ARRIVAL*** (JOB SCOPE: IA CEMENT PREP) RUN TBG PUNCH BHA. TAG CBP TOP AT 8466'. TBG PUNCH AT 8450' - 8455' (21 HOLES). THUNDERBIRD CONFIRMED ABLE TO CIRCULATE 5 BPM THRU PUNCH HOLES TAKING IA RETURNS. TB CIRCULATED 680 BBLS DIESEL DOWN TBG & UP IA. SET 4-1/2" HES FAS-DRILL SVB COMPOSITE CEMENT RETAINER ME AT 8420'. TOP OF RETAINER AT 8419'. POOH. RIG DOWN ELINE. ***JOB COMPLETE*** 6/29/2021 T/I/O=1050/1050/100 ASSIST E-LINE (CIRC-OUT) PUMPED 640 BBLS DIESEL DOWN TUBING,UP IA, TAKING RETURNS F-11 FLOWLINE. PUMPED 140 BBLS DOWN IA FOR FREEZE PROTECT.TAGS HUNG ON WV/IA FWHP= 300/300/50 IA/OA= OTG, HL=C E-LINE IN CONTROL OF WELL UPON DEPARTURE, 7/6/2021 T/I/O = 580/670/80. Temp = SI. IA FL (coil req). ALP = 1000 psi, AL SI @ casing valve. IA FL @ 78' (4.2 bbls). Coil in control of well upon departure. 13:00 7/6/2021 CTU 9, 1.75" CT - 31.9bbl, Job Objective: IA cement job. MIRU. Make up and RIH with HES Fasdrill stinger BHA. Sting into retainer at 8423' ctm and tested. Pump 231bbl of 15.8ppg Class G cement into the IA. Estimated TOC is ~4,340'. CIP at 20:30, 17hr 42min to 500psi compressive strength. Unsting from retainer with 2bbl left in the coil, lay in cement on retainer and reverse out down to 8400' with slick 1% KCl + safelube. POOH pumping displacement, and left a 5bbl diesel FP cap on the well. ...In Progress... 7/7/2021 CTU 9, 1.75" CT - 31.9bbl, Job Objective: IA cement job. Currently waiting on cement. Make up and RIH with 3.800" milling assembly. Tagged at 8406' and begin milling. Milled through retainer at 8423', cement, and CBP at 8467'. Pushed debris to LTP at 8535'ctm, unable to get stalls on LTP. POOH at 80%. ...In Progress... Daily Report of Well Operations PBU F-10C 7/8/2021 CTU 9, 1.75" CT - 31.9bbl, Job Objective: IA cement job. RIH with 3.68" venturi. Dry tag 8539'. Make four venturi passes from 8510' to tag . POOH pumping displacement. Recovered pieces of Fasdrill retainer. RIH with venturi BHA again. Tag at same depth, and make 4 passes. POOH pumping displacement. Make up and RIH with 3.800" venturi burnshoe assembly. Reciprocate 4 times, POOH. Recovered large metal pieces and CBP material. RIH with 3.80" venturi burnshoe assembly. Tag 8540', reciprocate three times and venturi while stacking weight. POOH, minimal recovery in venturi, no large metal pieces. ...In Progress... ***Liner Top Packer fishing neck is likely damaged*** 7/9/2021 CTU 9, 1.75" CT - 31.9bbl, Job Objective: IA cement job. RIH with 1.77' three blade junk mill. Dry tag 8536'. Unable to get any motor work, stalls immediatley. Able to bullhead at .9bpm at 1600psi with diesel. Conposite bridge plug debris still at LTP. POOH turning well over to diesel. OOH with milling assembly and mill has minimal wear. Well freeze protected with 100bbl of diesel. Pad operator notified of well status, slickline to follow. RDMO. ***Job Complete*** 7/9/2021 T/I/O= 0/300/100 (Fluid Pack Tubing) Pumped 50 bbls diesel down the tubing, FWHP=1000/300/100 7/10/2021 **WELL S/I ON ARRIVAL** BRUSHED TBG & DRIFTED w/ 3.73" SWAGE & 3.79" GAUGE RING TO LTP @ 8534'MD. SET PX PLUG BODY @ 8527'MD SET P-PRONG IN PX PLUG BODY @ 8527'MD (PRONG = 8' OAL, 1.75" FN) 2500PSI CMIT TxIA (PASSED) 2500PSI MIT-T (PASSED) **WSR CONT ON 7/11/21** 7/10/2021 T/I/O= 0/0/100 TFS Unit #1 (Assist Slickline with MIT's) CMIT-TxIA ***PASSED*** to 2650/2520 psi. Target PSI of 2500 and a Max applied PSI of 2750 psi. 1st 15 min T/IA lost 65/140 psi. 2nd 15 min T/IA lost 25/70 psi. Total loss of 90/210 psi in 30 min. MIT-T ***PASSED*** @ 2690 psi. Target PSI of 2500 and a Max applied PSI of 2750 psi. 1st 15 min TBG Lost 50 psi. 2nd 15 min TBG lost 10 psi. For a total loss of 60 psi in 30 min. Bled TBG back to 1500 psi. Tags hung on IAC & WV. SL in control of well @ departure. FWHP= 1500/250/100 7/11/2021 **WSR CONT'D FROM 7/10/21** RAN CBL, LOGGED FROM 8506'SLM TO 2950'SLM *GOOD DATA* (TOC @ 4395' MD) IA BUILDING PRESSURE SLOWLY *FLUID LEVEL NOT DROPPING, APPEARS TO BE GAS LEAKING BY A/L LINE CASING VALVE* **WELL S/I ON DEPARTURE** Daily Report of Well Operations PBU F-10C 7/12/2021 T/I/O=165/8/100 (AOGCC CMIT-TxIA, MIT-T) CMIT-TxIA PASSED at 1935/1839 psi. Max applied pressure= 2000 psi, Target pressure=1800 psi. Pumped 5.3 bbls of diesel to reach test pressure. 1st 15 min T/IA lost 33/107 psi, 2nd 15 min T/IA lost 14/43 psi, total loss of 47/150 psi in 30 min test. MIT-T PASSED at 1904 psi. Max applied pressure=2000 psi, Target pressure=1800 psi. Pumped 1.4 bbls diesel to reach test pressure. 1st 15 min tbg lost 56 psi, 2nd 15 min tbg lost 17 psi, total loss of 73 psi in 30 min test. Hung fluid packed annulus tag. FWHP=104/85/100 SW,WV,SSV=closed IA,OA=OTG 7/16/2021 T/I/O = SSV/ 220/80. Temp = SI. Cellar prep (Pre SH weld). AL SI @ casing & lateral valves (1600 psi). IA FL @ surface. OA FL @ 6'. Bled the IA from 220 psi to 0 psi in 10 minutes (gas & fluid, 6 gallons). Pressured up the IA w/ N2 to 600 psi & bled to 0 psi twice(all gas). Bled the OAP from 80 psi to 0 psi in 50 minutes (gas & fluid, 2 gallons). Performed a NFT and strapped the OA FL @ 6' (x2 times). Removed grating from the back half of the wellhouse & 1 AL jack stand. Left the rest of the grating for operator access. Conductor steamed out on 08-05-20. Conductor has 12" of water in it with some residual RG-2401. Doors left flagged for flooring removal. Installed N2 caps on IA & OA. FWPs = SSV/110/90. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:50 7/18/2021 T/I/O = SSV/110/80. Temp = SI. Cellar Prep (Pre SH weld). AL SI @ casing & lateral valves (760 psi). Drilled and tapped 1/2" hole in 30 conductor. Installed a needle valve & gauge. Bled the IAP to 0 psi in 30 seconds (all gas, BT). Performed a NFT and inserted a weighted hose into the IA. Removed 9 gallons of liquid. Used a weighted string to strap the IA FL @ 8' (x2 times). IA liquid level is 5.5' below the SH. OA FL previously confirmed @ 6' (5' below SH). Installed N2 cap on the IA. Removed remaining grating cleaned up cellar area. Filled conductor with 7.5 gallons of sand. FWP's = SSV/190/80. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30 7/20/2021 T/I/O = SSV/160/80. Temp = SI. Assist welders (SH weld). AL SI @ casing valve. Bled the ALP to 0 psi. Bled the OAP to 0 psi (2 minutes, all gas). Started N2 purge. Bled the IAP to 0 + psi. Welded the upper and lower starting head. Wrapped the SH in insulation for cooldown. Replaced wellhouse grating. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 David Dempsey Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-5245 E-mail: david.dempsey2@hilcorp.com Please acknowledge receipt and return one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 07/22/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL FTP Folder Contents: Log Print Files and LAS Data Files: Well API # PTD # Log Date Log Type PBU 15-48C 500292263503 211-030 6/16/2021 CBL PBU B-07A 500292028501 214-091 1/20/2021 CBL PBU C-03C 500292012403 212-058 7/10/2021 PPROF PBU C-29B 500292147202 214-049 7/10/2021 PPROF PBU C-41B 500292238502 213-104 6/26/2021 CBL PBU F-10C 500292041003 213-086 7/11/2021 CBL PBU P2-34 500292255800 195-066 6/17/2021 CBL Please include current contact information if different from above. Received By: 07/23/2021 37' (6HW By Abby Bell at 9:33 am, Jul 23, 2021 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, July 21, 2021 TO: Jim Regg , P.I. Supervisor 7 z 7 SUBJECT: Mechanical Integrity Tests (/ �� �� ( Hilcorp North Slope, LLC F -10C FROM: Adam Earl PRUDHOE BAY UNIT F -10C Petroleum Inspector Sre: Inspector Reviewed By: P.I. Supry :j8r— NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT F -IOC API Well Number 50-029-20410-03-00 Inspector Name: Adam Earl Permit Number: 213-086-0 Inspection Date: 7/12/2021 ' Insp Num: mitAGE210719140119 Rel Insp Num: Pretest Initial 15 Min 30 Min 45 Min 60 Min 165 -j 1982 1949 ' 1935- 8 1989 - 1882 1839 ' 100 100 - 100 100 Wednesday, July 21, 2021 Page 1 of 1 Packer Depth WellT F -10C Type Inj N rTVD X7073 Tubing !Test psi 1500 IA PTD 2130860 Type Test SPT BBL Pumped: j 5.3 - BBL Returned: s OA Interval'. OTHER jP/F P Notes: CMIT T & IA tested as per Sundry 320-365 to 1500 pre pop L4jea t S Pretest Initial 15 Min 30 Min 45 Min 60 Min 165 -j 1982 1949 ' 1935- 8 1989 - 1882 1839 ' 100 100 - 100 100 Wednesday, July 21, 2021 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, July 21, 2021 TO: Jim Regg ��- P.I. Supervisor 1' �(23(� SUBJECT: Mechanical Integrity Tests t Hilcorp North Slope, LLC F-1 OC FROM: Adam Earl PRUDHOE BAY UNIT F -I OC Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry 'Z10 - NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT F -IOC API Well Number 50-029-20410-03-00 Inspector Name: Adam Earl Permit Number: 213-086-0 Inspection Date: 7/12/2021 Insp Num: mitAGE210719131412 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min � oc Type In N TVDp '° YP -� - - kTV 1 �3�TubingT lozs ��1006F-1_ — 1011006Well PT 2130860 T e Test SPT 1Test SI 1X71 — -- -- — - -- 1.a -BBL Returned: 1.4 OA too - ]oo ]o0 100 ' BBL Pumped: P — — --I -- --- - — 4 Interval OTHER P/F P Notes' MIT -T tested as per Sundry 320-365 to 1500psi Wednesday, July 21, 2021 Page 1 of 1 Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:213-086 6.API Number:50-029-20410-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028280 Property Designation (Lease Number):10. 8. PBU F-10C 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations …Fracture Stimulate …Repair Well … Operations shutdown IA Cement Job … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 12088 Effective Depth MD: 13cr80 / L80 11. 9/15/2020 Commission Representative: 15. Suspended … Contact Name:Aras Worthington Contact Email: aras.worthington@hilcorp.com Authorized Name: Stan Golis Authorized Title:Operations Manager Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing … Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: 4-1/2" Baker Packer Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 9045 Effective Depth TVD:Plugs (MD):Junk (MD): …Other Stimulate Re-enter Susp Well Suspend … …Plug for Redrill …Perforate …Perforate New Pool 8493 / 7743 8701 / 7926 Date: Liner 3542 2-3/8"8541 - 12083 7785 - 9045 11200 11780 Well Status after proposed work: 16. Verbal Approval: … … …Change Approved Program 31 - 110 29 - 9250 29 - 8420 14. Estimated Date for Commencing Operations: BOP Sketch 30 - 2678 Conductor 8160 Proposal Summary 13. Well Class after proposed work: 4-1/2" Baker S-3 Perm Packer 10700 - 12030 9048 - 9045 4-1/2" 12.6#28 - 8573 / 8701 - 8805 Liner 8527 7773 8527, 11100 none 30 - 2678 2670 9-5/8" 7" Contact Phone:(907)564-4763 Date: 7020 2648 538013-3/8"Surface 4760 …GINJ 5 Post Initial Injection MIT Req'd? Yes No 5 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 80 20" x 30"31 - 110 Intermediate 9215 6870 Liner 616 8744 - 9360 7965 - 8520 696 3-1/2" x 3-3/16" 8757 - 9453 7976 - 8620 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 11:28 am, Sep 01, 2020 320-365 Digitally signed by Stan Golis DN: cn=Stan Golis, ou=Users Date: 2020.09.01 11:16:11 - 08'00' Stan Golis DLB 09/01/2020 Biennial MIT-T and CMIT TxIA Cement Bond Log to AOGCC. 10-404 MGR01SEP2020 DSR-9/1/2020 X AOGCC witnessed MIT-T and CMIT-TxIA to 1500 psi before POP. Yesn Required? 9/1/2020 dts 9/1/2020 JLC 9/1/2020 RBDMS HEW 9/3/2020 F-10 IA Cement Repair Integrity Engineer:Aras Worthington (907) 564-4763 Ops Engineer:Noel Nocas (907) 564-5278 Ops Manager:Stan Golis (907) 777-8356 Expected Start Date:September 15, 2020 History F-10 is a producer with a slight Starting Head (SH) leak (weep) noted in March of 2019. A Sundry for repairing the SH leak was submitted and approved (Sundry # 320-299) on July 22, 2020. In the course of preparing for the SH weld the tubing and IA were loaded with crude and a failing CMIT TxIA was performed. A LLR of ~0.5 BPM @ 600 psi was established during a subsequent LDL which indicated a PC leak ~5720’ MD. An MITT passed to 2500 psi on 08/07/2019. Status Currently classified as Not Operable by Hilcorp due to the starting head leak and PC leak. Objective Repair the well with an IA cement job followed by a SH leak weld (separate Sundry) that is estimated to provide an incremental 250 MBO of production over the next several years. Without an IA cement repair the well has no utility in the foreseeable future. The proposed TOC the IA is ~4150’ MD which is ~1500’ TVD below the SC shoe and ~210’ shallower than the estimated top of the UG4 marker @ ~4360’ MD. This TOC will cover the PC leak at ~5720’ MD and will meet the regulatory requirements of CO 736. Post-job Evaluation o MIT-T and CMIT-TxIA o SCMT to confirm the Top of Cement (TOC) Long-Term Integrity Monitoring o Biennial MIT-T and CMIT-TxIA o Monitor and Record WHPs daily 2 Procedural steps Slickline 1. Pull Tubing Tail Plug. E-Line & Fullbore 1. Set 4-1/2” CBP just above the production packer. 2. PT of tubing/CBP to 1500 psi to verify CBP set. Five minute test, no more than 10% pressure loss. 3. Punch tubing in the middle of the first collar above the CBP. 4. Pump diesel down the tubing while taking returns up the IA, to confirm circulating rates and pressures through tubing punch. Circulate tubing and IA to diesel. 5. Set 4-1/2” cement retainer in the joint of tubing above the tubing punch. Fullbore (This step may be performed with CT as well but will not include the wiper/displacement balls in that case as the CT will be stung into the retainer) 1. Pumping down Tubing, establish returns up the IA and pump the following schedule: ¾~230 bbls 15.8 ppg Class G cement ¾Drop Retainer-ball, Foam-ball ¾FW spacer ¾~205 bbls diesel ¾Bump ball on retainer with ~500 psi excess. Slickline & Fullbore 1. Break-up cement retainer. 2. Log Memory SCMT from ~8450’ MD to surface to identify TOC. 3. Conduct AOGCC witnessed MIT-T and CMIT-TxIA to 1500 psi. Ensure 24-hour notice provided for AOGCC. 4. Break up cement and CBP and push remnants out tubing tail. Well Diagnostics & WIE 1. Update AKIMS and add biennial MIT-T & CMIT-TxIA Cement Calculations ¾9-5/8” x 4-1/2” volume from 4150’ – 8450’ MD: 230 BBLS CBL data to AOGCC. 3 Production Casing Leak @ ~5720’ MD 4 F-10 Proposed TOC in IA ~4150’MD 5 F-10 Proposed P&A Reservoir Cement Plug Surface Cement Plug Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:213-086 6.API Number:50-029-20410-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028280 Property Designation (Lease Number):10. 8. PBU F-10C 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations …Fracture Stimulate …Repair Well … Operations shutdown Wellhead Repair … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 12088 Effective Depth MD: 13cr80 / L80 11. 7/20/2020 Commission Representative: 15. Suspended … Contact Name:Aras Worthington Contact Email: aras.worthington@hilcorp.com Authorized Name: Stan Golis Authorized Title:Operations Manager Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing … Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: 4-1/2" Baker Packer Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 9045 Effective Depth TVD:Plugs (MD):Junk (MD): …Other Stimulate Re-enter Susp Well Suspend … …Plug for Redrill …Perforate …Perforate New Pool 8493 / 7743 8701 / 7926 Date: Liner 3542 2-3/8"8541 - 12083 7785 - 9045 11200 11780 Well Status after proposed work: 16. Verbal Approval: … … …Change Approved Program 31 - 110 29 - 9250 29 - 8420 14. Estimated Date for Commencing Operations: BOP Sketch 30 - 2678 Conductor 8160 Proposal Summary 13. Well Class after proposed work: 4-1/2" Baker S-3 Perm Packer 10700 - 12030 9048 - 9045 4-1/2" 12.6# / 4-1/2" 12.6#28 - 8573 / 8701 - 8805 Liner 8527 7773 8527, 11100 none 30 - 2678 2670 9-5/8" 7" Contact Phone:907-564-4763 Date: 7020 2648 538013-3/8"Surface 4760 …GINJ 5 Post Initial Injection MIT Req'd? Yes No 5 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 80 20" x 30"31 - 110 Intermediate 9215 6870 Liner 616 8744 - 9360 7965 - 8520 696 3-1/2" X 3-3/16"8757 - 9453 7976 - 8602 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 9:53 am, Jul 15, 2020 320-299 Digitally signed by Stan Golis DN: cn=Stan Golis, ou=Users Date: 2020.07.15 06:56:42 - 08'00' Stan Golis 10-404 MGR15JUL2020 SFD 7/15/2020 DSR-7/21/2020 Yestion Required? Comm. 7/22/2020 dts 7/21/2020 JLC 7/22/2020 RBDMS HEW 7/24/2020 F-10 Starting Head Weld Integrity Engineer: Aras Worthington (907) 564-4763 Ops Engineer: Noel Nocas (907) 564-5278 Ops Manager: Stan Golis (907) 777-8356 Expected Start Date: July 20, 2020 History F-10 is a producer with a slight Starting Head leak (weep) noted in March of 2019. An MITT passed to 2548 psi on 07/20/2019 and an MITIA passed to 2500 psi ion 06/23/2020. Status Currently classified as Not Operable by Hilcorp due to the starting head leak. Objective This procedure is to weld the pup joint threaded connections and the fluted hanger and at the starting head above to seal-off the leaks. Procedural steps DHD/Special projects 1. Perform UT inspection of the 13-3/8” Pup to be welded to ensure sufficient material thickness to support casing loads while welding. 2. Bleed IA and OA pressures to 0 psi and purge IA and OA with nitrogen surface blanket. 3. Preheat fluted hanger, pup joint, and Starting Head as prescribed by welding program. 4. Weld threaded connections at the top of the fluted hanger and the bottom of the SH. Slickline 1. Pull TTP. DHD 1. POP well Under-Evaluation and monitor SH for leaks. 2 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIaN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:,-.r-i--C i 8P 12-- 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 213-086 3. Address: P.O.Box 196612 Anchorage, Development WI Exploratory 0 AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20410-03-00 7. Property Designation(Lease Number): ADL 0028280 8. Well Name and Number: PBU F-10C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: E"(:,Et E0 Total Depth: measured 12088 feet Plugs 9 measured 11100 feet true vertical 9045 � r r feet Junk `~r-[[,,' 2�1'�� measured feet �'�!.J Effective Depth: measured 11100 feet Packer measured 8493 feet true vertical 9042 feet Packer true vertical 7743.73 feet 1- t./ . Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 31 -111 31-111 Surface 2648 13-3/8"72#L-80 30-2678 30-2678 4930 2670 Intermediate 9215 9-5/8"47#L-80 29-9244 29-8414 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10700 10870 feet 10700-10870 feet 10950-11050 feet 11250-1141o feet 11470-11690 feet 11750-12030 feet True vertical depth: 9048-9046 feet 9048-9046 feet 9046-9043 feet 9043-9045 feet 9045-9042 feet 9043-9045 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: �C.ti4114 Er) r '\',3 0 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 304 22491 24 760 1005 Subsequent to operation: Shut-In 680 40 14.Attachments:(required per 20 AAC 25.070 25.071,8 25.283) 15.Well Class after work: Daily Report of Well Operations G3 Exploratory ❑ Development 1Z1 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil IRI Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature A j.,.-v.-td, ���\ Phone +1 907 564 4424 Date 2/2/16 Form 10-404 Revised 5/2015' KV--• Z Li 4 j a° -G( p a• RBDMS LA- FEB 0 4 2016 Submit Original Only 1111/ • rn 002082 OOO Ca a L P r No O UP L r O C N Nr r r- m Or N- up N U 15 0 0 0 0 5 O O O OM) 0I0 CV CO „. M CN M m d' a) O m Or OOO N- co co Nr O O O Nr N O .- M r N� � N N (A O M r CA r CO O t O () O 00 CA O N CO O CO CO N- CO N- N- CO H r O CD 000 O (O I"-CD QD W 00 . M M M N Is O CA CD CA CV CA CD N- N- F F F N- Q) r O V O O M N- O r N- V O O CO N- Or- O CA r CO NN M M r- NT O N- N- N CA CA CD 00 C)) O CO CO V C I 1 1 1 1 1 1 1 1 1 1 11:1 0 Q CDrOCr tC) NOoCOC) arj M M N L N- N- N- N- Na) N- _ O co co co O O O CO C) a 00p O O OOO 0 0 OCD c0 Op J J O J J J _U O M d O a N •NN x =6 ) CO O N- 4 NiO nj CUp SO 03 O O - - N _ r CV _ U N w ° . b cq " - (V) 1 i F- i M N r r O N N 01 _L r 4 V' L_ N31 CD N N r O CO C O CO N O N r N N Nr ON CD W N CT M O O O co -J W CCCC3 .7) U W W ° auz W W W W W W m m m O D H z z z z z J D J O (n Z J J J J J H F- H • • Packers and SSV's Attachment PBU F-10C SW Name Type MD TVD Depscription F-10C TBG PACKER 8493.37 7743.73 4-1/2" Baker S-3 Perm Packer F-10C PACKER 8537 7781.95 4-1/2" Baker KB LT Packer 0 • « \ / ca) \ _ I 0 q ± / I wm 0 0 I- f I 5c k \ % w 0I a) k \/ a) 2 2 k / o0 E I % , \ U) \ a e 2 C c CO .- 2 I a 5 2E- 0 c1- 0 U � ƒ \ ƒ c c ƒ 2 o 0ac ± 2 � § \ \ \ 2 o \ E � ® k im � (1) 4- i_ = a 6 ISI / c d \ ■ a O = O 2 a G O Ce A O c .e 0 \ O \ I >, \ ? o, \ ? n ° 2 = . I- o $ I f r, 0 / _ as % / i > / b 0UHa a / / /= 8 / cp c . U 7 2 \ E $ ± R 7 0@ � . c U 0 f g , e c $ a ee § 2e / \ ƒ / 2 § oU c .> 2 0 - _ > - E U a / :_ ' 9-/ It tD - � _ ¥ = - / « G x D c ~ ~ f U O 2.2 # : O O 2 \ / 2 ¢ UJ I- (0 0 2 L / / / v- 7 ƒ CO / c � ,- G 0 < • Sl f NOTES: WELL ANGLE>70°@ t 0001'. ' WELLHEAD= McEVOY ** ACTUATOR= OTIS F-1 OC CHROME TBG ***128'GAP BETWEEN 4-112"TBG w/ INITIAL KB.ELE 66.33' NO ENTRY GUIDE @ 8573'&9-5/8'PKR @ 8701'*** BF.B EV= 37.68' /li I KQP= 9360' 20"CONDUCTOR --1- 110` 2106' —14-1/2"HES X NP,D=3.813" Max Angle= 94°@ 11040' Datum MD= 9746' GAS LFT MANDRELS Datum TVD= 8800'SS ST MD TVD DEV TY FE VLV LATCH PORT DATE 4 3293 3293 4 MMS DOME RK 16 08/12/13 13-3/8"CSG,72#,L-80,D=12.347" 2678' 3 5908 5606 38 MMG SO RK 20 08/12113 1110 2 7615 6989 33 MMG MY RK 0 06/13/06 1 8433 7691 29 MMG MY RK 0 06/13/06 Minimum ID = 1.92" c 8552' I I 8472' --H4-1/2"HES XNP,D=3.813" 2-318" LINER PUP JOINT 8493' H9-5/8"X 4-1/2'BKR S-3 PKR,D=3.870" 8527' —14-1/2"FES X NP,ID=3.813" 8534' —{4-1/2"KB LNR TOP PKR,D=1.81"(08/11/123) [TOP OF 2_3i8 LNR_4 8641' , 8541' —2.70"BKR DEPLOY SLV w 13.8'SC DUPE GUIDE,D=2.25' 4-1/2"TBG, 12.6#,13CR-80 H 8573' I— VAM TOP,.0152 bpf,D=3.958" $573' —14-1/2"MULESHOE,D=3.958" — 8701' —19-5/8"BKR PKR,D=4.000" ' , 8743' —14-1/2"OTIS X NP,113=3.813" TOP OF 7"LNR H 8744' 8757' H3.75"BKR DEPLOY SLV,D=3.00" 8763' --I3-3/4"X 3-1/2"XO,D=2.880' BEHIND r_� 8774' —4-1/2"XNhP(P&L8 )D=3.80" LNR 3-1/2"LNR,9,3#,L-80,.0087 bpf,D=2.990" —I 8777' 1---.......„ r-- 8776' H3-1/2"HOWCO X NP,ID=2.813" 4-1/2"TBG,12,75#,L-80,D=3.958" — 8805' i 8777' --I3-1/2"X 3-3116"XO,D=2.880" . 8805' H4-1/2"SOS TBG TAI.,D=3.958" 9-5/8"CSG,47#,L-80,BUTT,0=8.681' H 9250' 7"LNR,29#,L-80 BUTT,.0372 bpf,D=6.184" — --9360' 3-3/16"VVMPSTOCK(07/22/13) H —9453' MLLOUT WINDOW(F10B) 9360'-9368' 3-3/16"LNR,6.2#,L-80 TCI,.0076 bpf,D=2.805" —I —9453' MLLOUT WINDOW(F18C) 9453'-9457" PERFORATION SUMMARY REF LOG: ON XX/XX/XX ANGLE AT TOP PEW:93*((g10700' Note:Refer to Production DB for historical perf data SIZE SPF INTIM/AL Opn/Sqz SHOT SOZ 1.56" 6 10700- 10870 0 08/05/13 1.56" 6 10950-11050 0 08/05/13 11100' --12-3/8"WFT CEP(01/09/16) 1.56" 6 11250-11410 C 08/05/13 1.56" 6 11470-11690 C 08/05/13 1.56" 6 11750-12030 C 08/05/13 FBTD --I 12044' [ -3/8"LN2,4.61t,L-80 TH 511,.0039 bpf,D=1.995'1-1 12083' i i DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/26/791 INTTAL COMPLETION 08/30/13 JhfUJMO WS DEPTH CORRECTION Wa.L: F-10C 06/06/00' 'CTD SDTRCK(F-10A) 01/12/16 CJS/JM) SET WFT CDP(01/09/16) PERMIT No:1130860 06/14/03 N2ES CIE/SIDETRACK(F-1013) API NO: 50-029-20410-03 06/06/06 N2E'S RWO SEC 2,T11 N,R13E,2318'EN_&2408'FWt. 08/06/13 NORDIC CTD SIDETRACK(F-10C) 08/17/13 RR PJC FINAL ODE APPROVAL BP Exploration(Alaska) \Q o ii N� Q 0 m.� W1a o _ oZIIo oNOS 'OJa O Q N- • r N a QN W ao D > co E or ce 0 m LL 0 IL 0 I o 1 1 u. ii >. Z a 6O a0O Q 0 Zq o a) D D W (n QUI mw UI Z w L7 N O 7 } } m 00 y 0 y LL 0 T_ Lu EJ -- I in �� W (n m m a a LL W IL JI W C0 JI O 2 O O W W O O Z J •U O ,- ,- O O v" y JI N Z JI H z d ! Hi LL LL 2 2 LL LL Q LLI , LLQ LL J LL LLI 0 O 1 p O c 1 • ai ai Oj Oj ai ui w°Z =°>c,c� �° •ai Z U •ai gi>- Z 'C Q1 I.L l.L ll it LLI @ > 2 lL LLI Q LL W LL W a° E o o acn acn o o o0- 0 1m oO- ccE O O co £ • c c 0W COc c cpm c MI .Em cDJ E O ,. 2 2 2 2 O 2 m O O O co w O) W0 000J `J !/�2 �fA co o J V aoi a�oi MQ MQ a� a� OUIM t,(05 a1oiUlM CS �Ulml �UI c o W W NS N2 W W W �N W�D LI,-(N W �� W � SJC �. N 0A Z •C o U I c v _M _M co_ _M M_ M_ _M _M _M _M _M li 1 Y j O O O O O O O O O O O W c° N N N N N N (N N N C•/ N O7 V M M M M 0 0 O O O O O ° 1 m Ce J CO 00 0) O co O co O) m O) O a ,. W K WJ 2Z C.) m O 0 0 Z 8 co O 4:C lii $ a co to y $ o o N o .J aO0 0 ' c zi c t _ _ C r O w O 0 M M a) O w N' m • N V U m I ao o M 1 c 3 O C.1 a' Z Q bb o i 1 ' LL )6 • CO0)rri J 2 2 ).- N J CO m coin U J M M O O) 1 11 v/ 0 0 C7 Q a o x z° °' of \� Q a ! Z G O E U II o Z 7 U U 03 O) CO 03 , co CO CO OS CO CO CO CO co O) CO OS CO 03 CO @ OS CO CO CO fO v E E 0 0 0 0 T T 0 0 0 0 0 0 0 o rt z . . o a� a� w w w w co _m _m 0_m _m 7 7 O) O) _m 0 0 O) _m O) 0_O 0 Z O r 0 0 0 0 co 0 0 0 0 co > ! 0J ` d d CO M M CO M V V N N- N. N- N- U) w W- 1 h n h h n r r r 0 O O O O O F d o w E IN N N N N N N N CO M M M M I 1 2 !,11 O O C W O z N N N N N N N N N N co co co N ° raQ c £Z Ts E co V LLC O a .: w — re ? W c G 2 0 0 0 0 0 0 0 0 0 0 0 0 E Q J ° F' d — o)- 0.1 D 0 0 0 0 a a 0 0 0 0 0 0 0 0. CL o 3 3o ~ W W W W CC Ce W W W W W W W N O NI CO co1 O \ \ LY m aI W_ W_ a O I- aUJ cv l N N \ .c 0 0 p1 W LL LL J \ LL IE. N0 O w coa_ LI co > z c 0 1 l t QI z z o — 2 JI NI Y o O o • \ 4.6 m 0 • m -I LL LLI it I in OI Z w t N w N ° J J m z L71 g g IL C a ILI U m () rn v d N > > > = LLI p NI NI co Q LLI I- ZI w U) I- I- > LL V) U) V) MI MI N N Q CO LL LL 00 U U U U U 0 00P UE, 0 0 Z } }I Y O O O O O O O O O O O N O N Q Q F J II LL 1-1u) LL W LL J 0 X LL LL LL w LL LL LL LL IL LL LL LL 5 LL j LLE, LL E, 0 . 60Q aireE 6 c 6 6 6 6 6 ai 6 6 aiW 6W 6 6Q 6Q ai 01 ai 01 x — Z 11 2 LL D •• it D it n it I1 LL. it it I1 I1 it - it N it it OI it O1 it w LL �. 1 U c� I m1 0 12 0 I 0 o g O OL g o 0 0 0 o 0 o c� 0 m O w o I 10 7 C M C m C C a C COC C C C C COCOC C N C N_ C C U w 0 0] O m MI O m O 2 2 O O O O O O O O O O 2 2 ce /�/ J Li)- _NON NoN N6 _NE, _N NX N N 0 0 0 N0 a>0 N N0I� N01I Npim 0plm 1L Q ami W.- p W J W � 2 W N W Wa- W W W W W W a_ W LL W W 1a W 100 W .- I EL].- I 0 0 3 co co co co co M M M M M M M M M M M M M On i= U E, 0 0 O O O O O O O O O E, E, E, E, E, 0 WN N N N N N N N N N N N N N N N N N N o_ _0 0 0 0 _0 0 0 0 0 0 0 0 0_ o_ _o _o _o c rn m rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn m a 1 W W J U m o z Q t N J a • o N. 2 r N N a 7 E VM U ooo VN a o 0. LL 1- z _M C (_ • ON CO m w COIll O N V/ p a Q CC ° (1▪3 Q ci n z E p E U m z co co CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO N CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO @ CO CO ✓ a a a a a a a a a a a a a 0 a a a a .:I- o ns m m m co _co co co co co co ca CO m CO CO CO CO 0) o) .0) 0) 5 0) '0) '0) 5 5 '0) 0) '0) 0) 'rn rn 'rn 'rn o p a 0 a 0 a a a a a p a b a b 6 i5 o a co > n n n n n n n n n n n n n n n n n n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O MM co co co co co co co M co co co co co co co co co co co co co co co co co co co co co co co co co co CO N N N N N N N N N N N N N N N N N N N E W a co O N U " '- U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U U E 0 a 10 a a a a s a a a a 0 a a a s a a a a 2 W W W LU W LU LU LU LU W W W LU LU LU LU W W o \ \ \ \ 1 1 \ m• c 0 1 t 1 a CO X 9 W W OW OW W 0 1 c 0 • ,. r LL LL LL LL LL L o Z , JI JI JI JI JI �I L I a) c Q C • C C C X Q. O) _0 I Z Z Z Z Z_ a) "O V- > O H O - O O O N >, CV LL LL U LL LL I to a) '- tt 9 o = 01 DI DI DI DI c o (n U) 0 to to o 0 c tt N N t0 t0 l0 > > U > > > U) > > > U) a) O I I I I ° 1 ~ 0) t i L~O L i '� L~O LL Z M M M M M (0 a) J 0 I 1 — U J CO 03 CO 03 CO Q N N N N N CO H Y 1= U W LL LL LL .o LL LL LL .o LL Q Q Q Q Q < 0 X o Y o 0 0 t) o o o n 0 _ _ _ _ _ W o) F • o o o J LL p LL p LL o LL o LL o .� 2 Z LL U X LL LL LL LL LL LL LL 0 Oi a) U)I a) U)I X a) coI a) 01 N 01 a)p a) N a) a) a)X a) a) a) a) a) a) a) a) a) ? LL d' h LL LY o LL LY LL LY 2. LL LY LL 0I Il. it it LL it L` it it to it 11 it LL it I.L LE co 0 I t 0 ' 0 I 0 10 0 I.c o o 0 0 0 0 00 0 oLL 0 0 0 0 0 0 c) ECC c tY w 'c EW ECL E 1 c c c 'c c c Eo 'c 'c 'c •c 'c 'c c rn w4 00 20 #'c o0 207 . o0 o 0) o 0 0 0 0.- o o� 2 0 0 0 0 0 0 v VI2 —1 V12 ;U12 U1= 01 01 X 0 0 0 0 0' 8 .)H 0 0 0 0 0 0 0 Ce °nom nom worn oom worn -o a) m a) a) a) a)o a) CD a) a) a) a) a) m m Ce W I W 1 .ED N.. 1 CO I W 1 W -O W LU W W W N W W l W LU W W LU LU W Lt OO 3 M CO M M M M M CO CO M M M M M M M M M M M O. Q 5 U O O O O O O O O O O O O- O O O O O O O O W aNO NO NO NO NO NON N N N N O O O O ON N O --- 0 N N N N N N N OOOOOO O _ _ _ _ _ CB a LU W Ce) m o Z o Q co o w Om C 2o0 N 0 4 E V M 0 00 o M . Q o 0.0 Gce 4 l'n" LL ~ Z C CO C o 2N CO CO COAO O a) CO m O m 0 Q 0. o Q o O Ti co Z m as co as co as co co co to as is m m CO CO CO m CO m d CO m co co is is m m m co to is co w co co co m m co 3 -1- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N (U co co co co co CO 66 CO CO t4 (U CO t6 t0 CO is CO is 66 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0 6 0 0 0 0 0 5 0 0 0 0 0 0 L] 5 5 5 6 0 o t0 O O0 > o h. ts• N-o N- o 0 N-0 N- Is-0 o 0 Is-o N-o N-o N-o Is-o 0 F— o 0 0 0 0 o O O O O O O O O O O O O O O O co co co co co co CO M CO M M CO CO CO M CO CO M CO M M M CO M M CO CO M M M CO M CO CO M M Co co CO M co ✓ N N N N N N N N N N N N N N N N N N N N N •C 00 O a0 O N U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 UV E 0 d0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 2 w w w w LU w w w w w LU w w W W LU w LU w w I 1 M a m I I o 0 1 1 m— JI JI -I JI -I -I -I —I �I co - o t 01 w z z z z z z z V .` z _, y w a) 0cn a a@i-54 LL QI LI LI LI LI LI LI LI 01 01 01 01 01 01 0I ml o 5 -0 -0 2 I z N ti I I Z WI CV MI MI MI MI MI MI MI VE 0 LL., D 0 0 LI u t U z j w 2 2 H I N N N N N N N MI pI 0 CO O E mW m m m m2 COI- D > > > D > > 0 Q Q a 0 0 a a 0 ml d MI cococooao U) 0) 0) ) I---. u Co < Y UCV CV CV CV CV CV = O O O O O O N O N N NI NI NIX OI �I NI U) W I- J j LL.O LL LL LL LL J 11 J lL O LL a) co LL a).., LL O O LL O LL O N LL a) .. -N i U O o !r !Ya Xw 2 � CCa Cern co C) a) p N N• 0. a)o a)o a) I a) I U a) I L N I.- a) I a) I U a) I L a) a) a) a)X ? `- L >. it LLii: LL N E N E Y LL ce" W w LWw LL.dIL LL rnI 1L LL y 1 I C7 C7 . CD C9 . CD . CD . C9 Y y U U 'U 'U .2 g)) U m U II 'U II U I- 'U III I- 'UI 'U U O c c c c c c0 cc c c c I c -- c-- c- - c -- c x c c,- QJ V v V 0va1 t.aIQ1 1 VIaIc v-0 CC et Q. 0 )0 4.: )D 0 0 000 000 vD0 )D0 a 0 0� a) ) a) a) a) a)0 a)0_ a)OJa)OJ a)OJa)OJOo_1 a)OJa)O-- a) 1Z a) a)0Q c _ IL W W CO W 115 W II W —W W --W _ .-W WSW W—W WSW WSW W� Ce CO WN O0 = M M M M M M M M M co M M M M M M a I- 00 0000 0 0 0 0 0 0 0 0 0 00 LU 2 N N N N N N N N N N N N N N N N IX 0 _O O O_ O_ V- iiiO O_ _ CB CB O O O O_ O_ O_ O_ _O _O O a LU W C.) 0. o Z 8 Q = J 0. 03 o CL C s G N a) a E o ; U M 0 J m• < U v 0 ba a. F" ~ z M C >. o CN CO m COLO O 0 O (O 0 Q ao a) Q C a z E Q £ U co z Co co co CO 03 Co CO N 00 Co N c6 03 CO CO 03 O (0 Co Co 03 N m Co (0 CO (O CO (0 CO CO (0 ✓ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a m CO 03 TO m m 00 CO m m CO CO CO CO m w 0) o) 'o) 'o) 'v) a) o) a) a) 0) 0) 0) o) 0) v) '0) o D Co 5 5 b 5 5 6 0 O b O C5 0 o > o 0 a a a a a a 0 a a oN o 0N. Cr- o 1- o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO CO CO CO M M CO CO CO CO M CO M CO CO M M M M CO M CO M M CO M CO CO M CO CO M M CS; ,N N N N N N N N N N N N N N N N N O a0 CD 0 N Com.) !' • U U U U 0 0 0 0 0 0 0 U U 0 C) U C7 E O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 2 W W W W W LU W W LU W W W W W W W o • • e 0 9 o 0 o M p I I o G I • oo I C) C) I c o • c7 a z z a 1 2 et- Z • • a C7) w • f0 � o 0 0 O Q CA 0 V V V V V V V V 'C V V V Q• J a a C 0 OI OI 1 N a a a a a a a a a a a a Il 0 LL a LLQ Q a T 9 0 O Q O 0 Q Q Q Q Q Q Q d c c c U) ID 1 u) NI 01 o CL CL CL CL d CL CL CL d d CL' CL 0 0 0 CO 00 co1 ma a U)I z •w ZO 0 0 0 0 0 0 0 0 0 r' LL' N N Lo Q E C E a) a) c U C C C C C C C C C C C C CO'- CO O. 0. �I 3 D > 3 > 3 > > a) a) a) a) a) >- c CO C a) a) <0 V Q cecececececceecew ecceceE E E E E ao0 �I �I CfI 2I o a 000000000000 W LL co LL co LLI� LLI� LLIZ o awO a)0 a0 a0 0- --J ILL LL LL LL LL LL LL LL LL LL LL LL > > _ (/)Q CO D m Q m Q m a O 1'i N N N N N N N N N N N N N N N a) m v D.v Nva N v •a)a1 Z II it it it it it it it it it LL it. it it it it it 11 a Q Jco I Q JCU I _11(/) JIB LL J rt 0) o 0 o 0 0 0 o g o g 0 0 0 0 0 0 o a i p Z co o Z 6 oZJ o Z J o Z • 7 I c C 'c 'c c c 'c 'C c 'C 'c 'c c c C c c o a' c O C0 c O- c O c O Q c— N m 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0,Lu og - o20 ogU og • oLLl < aa)) CD a0i a0 a0) a0) a0i a0) a0i a0i a0 a0) CD a0) CD a0i Q M W a0)01 d of N of N a-0i o1 d o Ce Q N W W W W W W W W W W W W W W W W W N 2 W W,- W W .- W N 0• 0 = M C) M M C) C+) M M co co co co co co co M co co co co co co /� li e U 0 0 0 0 0 O 0 0 0 O O 0 0 0 0 0 0 O 0 O O 0 W ga N N N N N N N N N N N N N N N N N N N N N N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CC) )1) IL) IL) 0f) 0N N N N N IX J 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) a Ill w V m o Z Q o cCV cn J CCd 0) O coCcoC CL co 0 w C o r 0 O 0 0 , N N N p E VM V 00o o "' adQo tocta. I— LL H ~ ,_Z Co 2 = O N CO m 00 O a) CO 0 co Q Q a o a) Q o ° Q z 0 0 d c Eco 0 _z co co C0 CO CO CO CO 03 00 CO 03 CO (0 03 CO 03 CO CO N CO CO CO CO co a) CO C0 CO CO CO CO (0 CO CO CO CO 00 CO CO CO CO CO V CO CO CO CO CO c Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q o 0 0 0 0 0 o CO CO CO CO CO CO 00 00 m CO m al 00 CO Co CO CO I CO i0 COm To 5) 'En o) En En rn "En rn En o) o) En rn rn rn 5 En cm .o) 0) .o) 0) O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q Q Q Q 3 Q Q Q Q Q co > N- n N- r- N- N. N- n N- n N- r- N- r- N- r-• r` N- v v v v .4- co 1- O O O 0 o O o O 0 0 0 0 0 0 0 0 0 0 CO 0 CO C0 CO O M M M M C') M M M M co co co Co co co co co co co co co co co M co co co co co co co co co co co co co co co co co co co co co co co 1 .- N N N N N N N N N N N N N N N N N N N N N N N N •� 00 G co o CV N v O a`) 000000000000000000 p 0 0 0 0 0 ¢ a 2 w W w w w in LU w W LU LU w LU w LU LU W J LU W W W LU o • • • • • • • • • • O el O I I I w_ W_ - _I m IL o O 41 • Q CO 5: CE LLI NI = ❑I J1 O I W W W J J W co J < mi. Z O of 0 5: CDIJJI Z Z 0 Cl LL LL r N Q J I- W J Q Q IL U-1 O LU JJ I Q1 N — 0 0 u) JI Z Z Z 0I �I 0 LLI Z M > (O ,��JI LL LL CL Z LL ❑I ❑I ❑ ❑ LL OU Q LL M 'G' Z — hi LL co 2 2 H H- H ai0I LL (,)1 N w U Z E U QI 0 M1 MI MI coI J I D F. OIQ >-.ct NQJI � ~1 N N N N0 N } CLL CO2 mF- W Q `7 0_ mW 011 M O U U U' < N JI ) O_MI LL MI NI LL1H W itL ON c0,'5 Q Q f0 Q Q E W LLQ . 00 00 w LLZ 0 NJ co �0 T-0 N E E 0 NZY ...SJ ' w p) J pO O_ = 0 < LLQ UL=3 LLE. LLE. E LI_CD p) d_ CD m = u)LLi- I• LLJ 10 0 0 �a ❑ mZ_`L Q Q I c� Icy 0 m U ..CC _ I 1- o 6 w aiu) E 60E aiu) aiiu) >❑_I ai ai ai Z ,- LLQ a u) ❑LLI UI lL E.I LL'c; I 0. LL LU $) Il LU m 6:LU I- ii F w ❑ J= LL NI LL NI y_ LL OI U w 0Z O c)❑= 2 2 2 2 IY 9 IY 0 10 U I U LLU 0 1m c_ N C) 0 a .2m—I w ELL COO W E�m E�45 Ect ~ EW~ Ew~ 0 W 21 O W=1 0�coc°ow OCOmI O�� OXY cm2 I— 4 U 001 co 0 MW to-,01 �OIH 00I0=I 001=I 0012' 001❑I 001QI MQ �0N �0I� �0I— to ce N CO N N= W N W I O W Ica W —CO W,-CO W,-J W y-J N 2 W —D W 10 W 12 W LL W OO j co M M M co co co co M CO CO CO CL 0 0 0 0 0 0 0 0 0 0 0 0 IN N N N N N N N N N N N W O M M CO CO M M M M M CO CO N IX 0 '0) O O O O O O O O O O O a W W C.) m o Z 8 0 ICC s ao 0 co , E. N O 01 0 4) 7 o0. @ ' r p O M 0 M G a) 0)ON CD a E VM U oco ...IC.) ,ID a 0bp P. `_ LL r F Z 0) C m o MG N W m op p ILL 0 ( ❑ Q a E0IP Q p a Z O Qd Uto E m m co 0 0 Z co u) V CO CO CO COCO N .f0. .9 .9 .9 N W N 90 co y0 c0 3 0(0 CO (0 V( 0 CO (0 0) Lc) CO 0 ❑ 0 0 0 0 0 am0 i ❑ c) ❑ 0m = 15 (0 m CO m CO 10 I CO CO (0 (0 ❑ ES J ❑ ❑ ❑ ❑ ❑ ❑ b J ❑ ❑ ❑ ❑ Co > . . Tr Tr Tr Tr Tr Tr V Tr (() LO (1) Lf) CO F (0 O CO 00 CO CO CO CO CO CO W co co co 0 co M V V V Tr 7 R V 7 7 V Tr 7 M M M M M M M M M M M M CO CO CO TC N N N N N N N N N N N N N N N E co 0 00 2 N U 0 0 0 U 0 0 0 U 0 0 0 0 0 0 0 ❑ oo 0 a 2 w � 0 0 w w 0 0 0 0 0 w 0 o II c o Z 9 it Q Q • o c 1 Z Z O p Z LL LL O 71 Z .�C O �/ N z LLI co a >- } } O p p 0) O p I ~I HI 0 t > > 0' co _M M LL f0 C t O o O I- coC Cs. O J J J - Z N c. .2 4 N N E N E < 0 !L @ Z. N a) O IE rn Irn CO0 2 w E w Y co Y w 0 0 � J O �I0 SIU CCI- = z O IL.•••-'-'01-Ili OI m1 it 01 m1 Ir 7qG CL CO 3 cmll cmpI CmpI 0� U) ..9 OUMI OUIj O0w Woo E >- O} >- 1 N c0 ° L ° L M W 17') I1.5 IIyII U « N IN NW LLW W u__1 W LLJ N I O t I� O O co co M O.r .O-• .O-• II ISI 1.- U o 0 0 £ y E rn p N N N Q i LU M M M o Z co N N0 '0 O O a) foo '.. i� a it E X v a) (0 LU w m N 0) CL V o. m O E J E Z _ `° o m 0) :2 co < a 0 a 0 C' v E 0 C m N 2 N O4 aE co M0 r- do 0 ›- E 0 c E a o 0. o co 11 I- cc o } N 2 O fa Q Lf) a)aa)) E Ca m co C o I- E w -.?•' z O a) R ar co c N -• I (n = m N v a) co O p c 0 0 a c 2 .� d O �o N 1 r c n aci o °• m O 1 Z E o ` a) T TT, E U c p g 0 A 0 Z co • d LA p p p f0 c \a No J' cn a) co o) os 0 ›- e co ......... _........... ,, c ~ a c v a c w E n O me' N N N N y V '•51' m w N Q O N = N a ` co E E 0 N 0 0 y C O co 1 N Z L" C 2a oC C co O g 0 1 i a) UO UU 0 0 dp J ? cd UwOvm E cdE rn E o E u) E— pwww o To ?LL o O oa 2 1 o a 0 0 0 0 O 0 co N 9 0 • o V o• Z g N `��, • 5 , C c w z J oz o N 7w ci) co co /�/ J co G Ce Q N pa o U w o IX J a UJ w J V 0. m Q Z Q ao o) d 3 J a w° O co O. C 2o N E VM U ooo ICC o n a. LL ~ Z M C >- o CO N W mCO O a) CO 1 G m 0 Q ao a) < o a ci o � 0 \ co z d 0 �, rn o > m o ~ -o M 3 N d .> m cc 6• co 0 p ON C U U Z. O E £ a 0 0 2�3 OSgG 2-34 b DATA LOGGED .UU/ 1/2013 ITA-- M K BENDERECEIVED BAKER PRINT DISTRIBUTION LIST O C T1 2013 HUGHES ����^^ COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FII �"V' s (mandatory) WELL NAME F-10C ?'61 RUN NUMBER (mandatory) FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: August 8,2013 TODAYS DATE: 10/28/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FIELD FINAL (digitalCD / ADDRESS(FEDEXWILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #OF F'I-tIN I S #OF COPIES #OF COPIES 1 BP Exploration(Alaska)Inc. I 3 I 1 I I I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska I 1 I 1 I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I 1 I I I I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I I 1 I I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 DATA LOGGED RECEIVED •9ile/2013 M K BENDER SEP 1 0 2013 VAAOGCCDISTRIBUTION LIST AOGCC BAKER HUGHES COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME F-10C RUN NUMBER ,z' " cC:7 (mandatory) �'7 FIELD Prudhoe Bay BH SALESMAN Jesse Salyer (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: August 2,2013 TODAYS DATE: 9/7/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FIELD FINAL (digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #01-I'KIN I S #OF COPIES #OF COPIES 1 BP Exploration(Alaska)Inc. I 3 I 1 I I I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I I I 1 I I I Attn Ricky Elgarico I PO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska I 1 I 1 I I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 i State of Alaska-AOGCC I 1 I I I 1 I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I I I 1 I I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 . RECEIVED STATE OF ALASKA SEP 0 4 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG AOGCC la. Well Status: ®Oil 0 Gas ❑SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class 20AAC 25.105 20AAC 25.110 0 Exploratory El Stratigraphic 0 GINJ 0 WINJ ❑WAG 0 WDSPL 0 Other No.of Completions One ®Development ❑Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: , 12. Permit to Drill Number: BP Exploration(Alaska) Inc. -81€12e4& 44/5I2.A1.5 • 213-086 . 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 7/25/2013 50-029-20410-03-00 • 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 8/1/2013 PBU F-10C 2318'FNL,2871' FEL, Sec.02,T11N, R13E, UM 8. KB(ft above MSL): 66.30' 15.Field/Pool(s) Top of Productive Horizon: • 4091' FNL, 134'FWL, Sec. 01,T11N, R13E, UM GL(ft above MSL): 38.45' Prudhoe Bay/Prudhoe Bay . Total Depth: 9.Plug Back Depth(MD+TVD) 4229'FNL, 1872'FWL, Sec. 01,T11N, R13E, UM 12044' 9045' ' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 651958 y- 5974482 Zone- ASP4 , 12088' 9045' • ADL 028280 TPI: x- 655001 y- 5972770 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 656742 y- 5972669 Zone- ASP4 None 18. Directional Survey: ®Yes 0 No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL • 9453' 8602' • 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor Surface 110' Surface 110' 36" 7.5 cu vds Concrete 13-3/8" 72# L-80 Surface 2678' Surface 2678' 17-1/2" 3720 cu ft Arcticset II 9-5/8" 47# L-80 Surface 9250' Surface 8420' 12-1/4" 1262 cu ft Class'G', 130 cu ft Arcticset _ 7" 29# _ L-80 8744' _ 9360' 7965' 8520' 8-1/2" 278 cu ft Class'G' 3-1/2"x 3-3/16" 9.3#/6.2# L-80 8757' 9453' 7976' 8602' 4-1/8'.x 3-314 140 cu ft Class'G' 2-3/8" 4.6# L-80 8534' - 12083'_ 7779' 9045' 3" 50 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) 1.56"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr80; 8573' 8493'/7743'; - lYf,ON1PLEfiOirJ'i 4-1/2, 12.75#,L-80 8701'-8805' 8701'/7926' 51 .5 1 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 10700'-10870' 9048'-9046' J,t WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No 10950' 11050' 9046' 9043' Ita 11250'-11410' 9043'-9045' ) �_,i DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 11470'-11690' 9045'-9043' U.::-�---.7--•-•- 11750'-12030' 9043' 9045' 2500' Freeze Protect w/42 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ® No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit Original Only 29. GEOLOGIC MARKERS(List all formations and, Jrs encounter 30. 'ORMATION TESTS NAME MD ND Well Tested? V Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. 42SB/Zone 4A 9531' 8671' None CGL/Zone 3 9596' 8732' Base of CGL/Zone 2C 9689' 8817' 23SB/Zone 2B 9747' 8867' 22TS 9816' 8920' 21TS/Zone 2A 9884' 8965' Zone 1 B 10180' 9043' Formation at Total Depth: Zone 1B 10180' 9043' 31.List of Attachment: Summary of Daily Drilling Reports, Summary of Post-Rig Work,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Ron Phillips 64-5913 Email: Ron.Phillips@bp.com Printed Name: Joe Lastu a ( (1/L Title: Drilling Technologist / Signature: Phone 564 4091 Date: 1 ZiJl3 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= 6"CNV VVELLFEAD= McEVOY SAFETY NOTES: WELL ANGLE>70°@ 10001'. ""' CHROME TBG ""`128'GAP BETWEEN 4-1/2"TBG w/ ACTUAKOR= OTIS PJC DRAFT WNTIAL KB.ELE 66.33' NO ENTRY GUIDE@8573'89-5/8"PKR@8701"" BF.ELEV= 37.68' � KOP= 9360' 20'CONDUCTOR H 110' ' 2105' -14-1/2"HES X MP,D=3.813" Max Angle= 94°@ 11040' Datum MD= 9746' GAS LET MANDRELS Datum TVD= 8800'SS ST MD TVD DEV TYPE VLV LATCH FORT DATE 4 3293 3293 4 MAG DOME RK 16 08/12/13 13-3/8"CSG,72#,L-80,D=12.347" --I 2678' 3 5908 5606 38 MAG SO RK 20 08/12/13 2 7615 6989 33 MAG DMY RK 0 06/13/06 1 8433 7691 29 PJvIG DMY RK 0 06/13/06 Minimum ID = 1.92" @ 8552' 8477 --H4-1/2"HESX NP,D=3.813" 2-3/8" LINER PUP JOINT 8493' H 9-5/8"X 4-1/2"BKR S-3 PKR,D=3.870" 852T 14-1/2"HES X NP,ID=3.813" 8534' H4-1/2"KB LNR TOP PKR,D=1.81"(08/11/123) TOP OF 2-3/8"LNR -4 8541' - 8541' -2.70'BKR DEPLOY SLV w 1 3.8"SCOUPE GUDE,D=2.25' 4-1/2"TBG,12.6#,13CR-80 H 8573' — 8573' -4-1/2"MULESHOE,13=3.958" VAM TOP,.0152 bpf,D=3.958" 8701' -9-5/8"BKR PKR,ID=4.000" 8743' H4-1/2"OTIS X NP,D=3.813" TOP OF 7'LNR H 8744' 8757' -13.75"BKR DEPLOY SLV,D=300" 8763' -13-3/4"x 3-1/2"x0,13=2.880" BEHIND 8774' H4-1/2"XN NP(MILLED)D=3.80" LNR 3-1/2"LNR,9.3#,L-80,.0087 bpf,D=2.990" - 877T If 8776' -13-1/2"HOWC,O X NP,13=2.813" 4-1/2"TBG,12.75#,L-80,13=3.958" - 8805' • � 8777 -3-112"X 3-3/16"X0,D=2.880" 8805' -I 4-1/2"SOS TBG TAL,D=3.958" 9-5/8"CSG,47#,L-80,BUTT,D=8.681" H 9250' 7"LNR,29#,L-80 BUTT,.0372 bpf,D=6.184" -I -9360' \ 3-3/16"WFPSTOCK(07/22/13) H ^-9453' MLLOUT WINDOW(F10B) 9360'-9368' 3-3/16"LM,6.2#,L-80 TC1,.0076 bpf,D=2.805" H -9453' MLLOUT WINDOW(F10C) 9453'-9457'' FERFORAT1ON SUMMARY REF LOG: ON XX/XX/XX ANGLE AT TOP FERE:93°@10700' Note:Refer to Production DB for historical perf data SIZE SPF NTERVAL Opn/Sqz SHOT SOZ 1.56" 6 10700-10870 0 08/05/13 1.56" 6 10950-11050 0 08/05/13 1.56" 6 11250-11410 0 08/05/13 1.56" 6 11470-11690 0 08/05/13 1.56" 6 11750-12030 0 08/05/13 FBTD -I 12044' 2-3/8"LNR,4.6#,L-80 TH 511,.0039 bpf,D=1.995" -1 12083' DATE r REV BY COMMENTS I DATE REV BY COMMENTS FRUDHOE BAY UNIT 12126/79 INTIAL COMPLETION 08/13/13 PJC DRLGDRAFT CORRECTIONS WELL F-10C 06/06/00 CTD SDTRCK(F-10A) 08/13/13 RKT/PJC SET LTP(08/11/13) PERMIT ND: 2130860 06/14/03 N2ES CTD SIDETRACK(F-10B) 08/17/13 JGB/PJC GLV C/O(08/12/13) API NO: 50-029-20410-03 06/06/06 N2ES RI JO 08/17/13 Fe PJC FINAL ODE APPROVAL SEC 2,T11N,R13E,2318'FNL&2408'FWL 08/06/13 NORDIC CTD SIDETRACK(F-10C) 08/30/13 JNJJMD WS DEPTH CORRECTION 08/08/13 PJC DRLG DRAFT CORRECTIONS BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA WIVE Active datum:Kelly Bushing/Rotary Table 666.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/20/2013 02:00 - 03:30 1.50 MOB P PRE MOBILIZE RIG FROM PRICE PAD TO F-10C. SET T-MATS. RELEASE RIG FROM SUMMER MAINTENANCE ON 07/20/13 AT 0200 HRS. 03:30 - 04:00 0.50 RIGU N SFAL PRE UNABLE TO CYCLE MASTER VALVE- PRESSURE LOCKED. CALL GREASE CREW TO TROUBLESHOOT. OPEN SSV AND ABLE TO CYCLE MASTER VALVE. 75 PSI ON TUBING. BLEED OFF TO 0 PSI IN 20 SECONDS(GAS). 04:00 - 04:15 0.25 RIGU P PRE HOLD PJSM FOR BACKING RIG OVER THE WELL. 04:15 - 05:00 0.75 RIGU P PRE BACK RIG OVER THE WELL AND SET DOWN ON MATS. 05:00 - 08:00 3.00 RIGU P PRE ACCEPT RIG AT 0500 HRS AND START RIGGING UP LEVEL RIG INSTALL WELL HEAD GUARDS OPEN TREE VALVES TO EQUAILIZE ANY TRAPPED PRESSURE 08:00 - 08:15 0.25 BOPSUR P PRE PERFORM LEAK TIGHT TEST TO BREAK • CONTAINMENT TO NU BOPE 08:15 - 12:00 3.75 BOPSUR P PRE GOOD TEST,CLOSE SWAB&SSV AND MONITOR WING VALVE PRESSURE WHILE NU SHOOTING FLANGE,BOPE,SPOOL& SARBER TEST PLUG SPOOL 12:00 - 17:30 5.50 BOPSUR P PRE CONTINUE NU SARBER SPOOL,SPACER SPOOL&BOP'S. DRIFT BOP&SPOOLS WITH TEST PLUG. INSTALL SHOOTING FLANGE W/ ------------- 3'STICK OF LUBRICATOR. 17:30 - 18:30 1.00 BOPSUR P PRE INSTALL HOT TUB&QTS. SECURE& CONTAIN HOT TUB. 18:30 - 19:15 0.75 BOPSUR P PRE FLUID PACK STACK&HARDLINE. ATTEMPT SHELL TEST ON BOP STACK. SWAB VALVE APPEARS TO BE LEAKING BY-VOID PRESSURING UP. CALL GREASE CREW TO SERVICE TREE. 19:15 - 20:15 1.00 BOPSUR N WAIT PRE WAIT ON GREASE CREW. WHILE WAITING ON GREASE CREW,DISCOVER SLIGHT LEAK COMING FROM UPPER DOUBLE GATE LOWER RAM SEAL ASSEMBLY. 20:15 - 21:00 0.75 BOPSUR N SFAL PRE GREASE CREW ARRIVES ON LOCATION. MASTER VALVE PRESSURE LOCKED. OPEN SSV&ABLE TO GET THE MASTER VALVE TO CYCLE. SERVICE TREE VALVES. 21:00 - 22:15 1.25 BOPSUR N RREP PRE CONTINUE SCR ISSUES-MUD PUMP RHEOSTAT VERY SENSITIVE,SLIGHT ADJUSTMENTS ON RHEOSTAT CAUSING LARGE RATE CHANGES TO PUMP.FIX SCR PROBLEM BEFORE WORKING ON BOP LOWER RAM ASSEMBLY REPAIR. 22:15 - 22:35 0.33 BOPSUR N RREP PRE HOLD PJSM FOR REPAIRING RAM SEAL • ASSEMBLY. Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 2 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,820.00) Project: y Prudhoe Ba Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 22:35 - 22:50 0.25 BOPSUR N RREP PRE PERFORM DUAL BARRIER LEAK TIGHT TEST ON SWAB VALVE TO 3500 PSI-GOOD TEST. BLEED PRESSURE AND LEAK TIGHT TEST SSV/MV-GOOD TEST. CONTINUE MONITORING VOID PRESSURE THROUGHOUT BREAKING CONTAINMENT PROCESS. 22:50 - 00:00 1.17 BOPSUR N RREP PRE REPAIR UPPER PIPE RAM SEAL ASSEMBLY. INSTALL NEW SEAL ASSEMBLY. REPAIR COMPLETE AT 00:00 HRS. 7/21/2013 00:00 - 00:30 0.50 BOPSUR N SFAL PRE FLUID PACK BOP STACK AND HARDLINE. 00:30 - 02:00 1.50 BOPSUR N SFAL PRE ATTEMPT LOW PRESSURE TEST-PASS W/ FLAT LINE. BRING PUMP UP TO 4500 PSI& OBSERVE LEAK OFF. SERVICE CHOKE VALVE#14. ATTEMPT LOW PRESSURE TEST -PASS W/FLAT LINE. BRING PUMP UP TO HIGH PRESSURE AND INITIALLY OBSERVE FLAT LINE WITH SUDDEN LEAK OFF. CLOSE CHOKE MANIFOLD VALVES#12&#15 WHICH ARE UPSTREAM OF CHOKE MANIFOLD VALVE #14 AND LOW&HIGH PRESSURE TESTS PASS WITH A FLAT LINE. SSV SUPPLY PRESSURE LEAKING BY. SLB MECHANIC ON LOCATION TO REPAIR. TIGHTEN UP RELIEF VALVE&SUPPLY PRESSURE STAYING STEADY. 02:00 - 03:30 1.50 BOPSUR N SFAL PRE REBUILD CHOKE MANIFOLD VALVE#14. 03:30 - 03:45 0.25 BOPSUR P PRE FLUID PACK CHOKE LINES. 03:45 - 04:15 0.50 BOPSUR' P PRE PERFORM BOP SHELL TEST LOW TO 250 PSI &HIGH TO 4500 PSI-BOTH TESTS PASSED. 04:15 - 04:35 0.33 BOPSUR P PRE HOLD RIG EVAC/H2S/MAN DOWN DRILL WITH ALL RIG PERSONNEL. ALL PERSONNEL MUSTERED IN THE PRIMARY SAFE AREA IN A TIMELY MANNER AND WERE ACCOUNTED FOR. HOLD AAR AND DISCUSS EACH COMPANY'S CHAIN OF COMMAND. ALSO DISCUSSED WHAT EACH MEMBERS ROLES AND RESPONSIBILITIES WERE IN DIFFERENT SCENARIOS. 04:35 - 04:40 0.08 BOPSUR P PRE NOTIFY STATE INSPECTOR WE ARE READY TO BEGIN BOPE TEST. STATE INSPECTOR JOHN CRISP WAIVED RIGHT TO WITNESS AT 04:40. 04:40 - 05:15 0.58 BOPSUR P PRE LOAD BHI COILTRAK TOOLS TO RIG FLOOR. CLEAN&CLEAR RIG FLOOR FOR BOP TEST. 05:15 - 06:30 1.25 BOPSUR P PRE SUCK OUT BOP STACK&DRAIN VOID THROUGH WING VALVE. ND UPPER QTS CONNECTION TO ALLOW TEST PLUG TO GO THROUGH. MU TEST PLUG TO SAFETY JT& LAND PLUG AT 16.5'FROM TOP OF LUBRICATOR. FLOOD BOP STACK WITH WATER. Printed 8/19/2013 10:23:14AM North America ALASKA-BP Page 3 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 15:00 8.50 BOPSUR P PRE CONDUCT INITIAL BOPE PRESSURE AND FUNCTION-TEST AS PER NORDIC PROCEDURE,AOGCC REGS&DWOP POLICY.INSTALL2"&2-3/8"TEST JOINT AND PERFORM PRESSURE-TEST TO 250PSI/ 5MINS AND 3,500PSI/5MIN ON FOLLOWING ITEMS: -ANNULAR BAG -#1 RAM-BLIND SHEARS -#2 RAM-2"COMBIS(2"TEST JOINT) -#3 RAM-2-3/8" (2-3/8"TEST JOINT) -#4 RAM- 2"COMBIS(2"TEST JOINT) ALL RAMS CLOSED WITHIN LESS THAN 2SECONDS.ALSO TESTED HCR AND ALL VALVES ON KILL AND CHOKE LINE AS WELL AS KILL AND CHOKE MANIFOLDS. SUCCESSFULLY TESTED ALL VISUAL AND AUDIBLE GAS ALARMS.SEE ATTACHED CHARTS. WITNESS OF THE BOP TEST WAS WAIVED BY JOHN CRISP(AOGCC),BUT WITNESSED BY BP WSL&NORDIC TOOLPUSHER. PERFORM ACCUMULATOR DRAWDOWN TEST. -STARTING ACCUMULATOR PRESSURE= 3000 PSI -FINAL PRESSURE AFTER FUNCTIONING ALL PREVENTERS AND HCR=2200 PSI -15 SEC TO BUILD 200 PSI,95 SEC TO FULL PRESSURE. -3 NITROGEN BACKUP BOTTLES WITH 1900 PSI. FIRST TEST PASSED,NO PRESSURE SEEN ON SENSOR TIED INTO WING VALVE. SARBER PLUG IS HOLDING,CLOSE THE SWAB VALVE AND CONTINUE TESTING THE BOPE 15:00 - 15:15 0.25 BOPSUR P PRE BOP TEST COMPLETED,RD TEST EQUIPMENT 15:15 - 16:00 0.75 BOPSUR P PRE HOLD RIG EVACUATION DRILL-H2S MAN DOWN DRILL THE ALARM WAS SOUNDED AND 1 CREW MEMBER WAS LEFT BEHIND TO SIMULATE A MAN WAS DOWN.THE WELL WAS SHUT IN TO SECURE THE WELL AND ALL CREW MEMBERS EVACUATED TO THE DESIGNATED MUSTER AREA.WITH 1 MAN UNACCOUNTED FOR IN THE HEAD COUNT,EMERGENCY SERVICES WAS CONTACTED AND MADE AWARE OF A MAN DOWN.NORDIC PERSONNEL ARE TRAINED FOR REENTRY TO MAKE SURE THE RIG IS SAFE TO GO BACK IN BUT ARE NOT TRAINED FOR RESCUE. Printed 8/19/2013 10:23.14AM North America-ALASKA-BP Page 4 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 'X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr (ft) 16:00 - 17:00 1.00 ' BOPSUR P PRE PU THE TEST JOINT TO PULL THE TEST PLUG CANT ENGAGE THE TEST PLUG WITH THE XO TO PULL IT OUT.THE TESP PLUG HAS A SMALL PROFILE THAT STICKS UP TO SCREW THE XO INTO IT AND WE CAN'T GET STARTED. SUCK OUT THE STACK SO WE CAN SEE THE PROFILE 17:00 - 17:15 0.25 BOPSUR P PRE TEST PLUG IS PULLED,WE WILL NEED TO HAVE A CENTRILIZER MADE TO HELP GUIDE THE XO INTO THE TEST PLUG TO PULL IT. 17:15 - 18:30 1.25 BOPSUR P PRE PJSM TO RU THE INJECTOR,INSTALL THE QTS,STUFFING BOX,MU THE HYD LINES TO THE PACK OFF THEN MU THE GOOSENECK 18:30 - 19:00 0.50 BOPSUR P PRE CLEAN&CLEAR RIG FLOOR. PERFORM CREW CHANGEOUT. 19:00 - 19:10 0.17 BOPSUR P PRE HOLD PJSM TO INSTALL GOOSENECK. 19:10 - 20:15 1.08 BOPSUR P PRE INSTALL GOOSENECK&SECURE TO INJECTOR. 20:15 - 20:35 0.33 BOPSUR P PRE HOLD PJSM FOR PULLING COIL OVER ROOF &STABBING INTO INJECTOR. 20:35 - 22:45 2.17 BOPSUR P PRE PU INJECTOR&INSTALL NIGHT CAP. STRING WINCH CABLE THROUGH INJECTOR AND BACK INTO REEL HOUSE. ROLL REEL SHIPPING BAR INTO FAVORABLE POSITION. MU GRAPPLE CONNECTOR TO COIL. REMOVE SHIPPING BAR. PULL COIL ACROSS ROOF AND STAB INTO INJECTOR. CUT CONNECTOR OFF. MEG ELINE-GOOD TEST. 22:45 - 00:00 1.25 BOPSUR P PRE MU SLB COIL TUBING CONNECTOR.SLB ELECTRICIAN NEEDS XO FOR TESTING LOAD • CELL-GETTING ONE FROM SERVICE COIL. 7/22/2013 00:00 - 00:15 0.25 BOPSUR P PRE BOOT ELINE CABLE. 00:15 - 00:45 0.50 BOPSUR P PRE HOLD PJSM. MU STINGER&XO BACK TO CTC 00:45 - 01:45 1.00 BOPSUR P PRE LINE UP KCL TRUCK TO PUMP DOWN COIL& BEGIN CIRCULATING KCL THROUGH COIL. ATTEMPT TO PRESSURE TEST INNER REEL IRON-OBSERVE LEAK OFF,POSSIBLY AIR IN SYSTEM. BLEED OFF PRESSURE. SLB ELECTRICIAN BACK ON LOCATION TO TEST LOAD CELL. 01:45 - 02:00 0.25 BOPSUR P PRE HOLD PJSM TO PU INJECTOR,LD STINGER& PERFORM SLB LOAD CELL TEST. 02:00 - 02:15 0.25 BOPSUR P PRE PU INJECTOR AND LD STINGER. 02:15 - 02:40 0.42 BOPSUR P PRE PERFORM LOAD CELL TEST ON SLB 1 INJECTOR W/SLB ELECTRICIAN. RD SLB TEST EQUIPMENT. CTC PULL TESTED TO 30K-GOOD TEST. 02:40 - 02:50 0.17 BOPSUR P PRE HOLD PJSM FOR MU STINGER TO CTC, STABBING ON&PRESSURE TESTING. 02:50 - 03:05 0.25 BOPSUR P PRE MU STINGER&XO BACK TO CTC. STAB ON INJECTOR Printed 8/19/2013 10:23:14AM • North America-ALASKA-BP Page 5 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 1X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:05 - 03:30 0.42 BOPSUR P PRE CIRCULATE 2 BBLS THROUGH THE BAKER CHOKE TO ENSURE ALLAIR OUT OF THE PUMPS. PUMP 4 BBLS THROUGH COIL& ATTEMPT INNER REEL IRON PRESSURE TEST LOW TO 250 PSI-GOOD TEST. PERFORM HIGH PRESSURE TEST TO 4500 PSI-GOOD TEST. 03:30 04:00 0.50 BOPSUR P PRE CIRCULATE KCL THROUGH COIL TO MOVE SLACK FORWARD @ 2.3 BPM&3600 PSI. OBSERVE RETURNS AT 40.6 BBLS. RATE 2.2 BPM @ 3900 PSI W/COIL FLUID PACKED. PUMP TOTAL OF 85 BBLS THROUGH COIL. 04:00 - 04:40 0.67 BOPSUR P PRE RU TEST CHART FOR IRV,PO&LUBRICATOR PT. CIRCULATE THROUGH KILL LINE ACROSS THE TOP AND ENSURE ALL AIR OUT OF HARDLINE. CLOSE IRV&BRING PRESSURE UP. PERFORM PRESSURE TEST LOW TO 250 PSI-GOOD TEST&HIGH TO 3500 PSI-GOOD TEST. 04:40 - 04:50 0.17 BOPSUR P PRE HOLD PJSM FOR UNSTABBING INJECTOR& LD STINGER. 04:50 - 05:00 0.17 BOPSUR P PRE UNSTAB INJECTOR&LD STINGER. - 05:00 - 05:30 0.50 BOPSUR P PRE MU BHI UQC W/FLOAT VALVE SUB. ISI 05:30 - 06:00 !, 0.50 BOPSUR P ', PRE INSTALL TEST PLATE&PRESSURE TEST CTC -UQC CONNECTION LEAKING. RETRY-ALL GOOD,LEAK TIGHT TEST GOOD. 06:00 - 06:30 0.50 BOPSUR P PRE CREW CHANGE 06:30 - 07:00 I 0.50 BOPSUR N SFAL PRE NORDIC'S IN MICRO MOTION IS NOT WORKING PROPERLY,STOP OPERATIONS AND CIRCULATE FLUID FOR THE TOTCO TECH TO TROUBLESHOOT 07:00 - 07:30 0.50 BOPSUR P PRE LOAD BTT RUNNING TOOL FOR WS ON THE RIG 07:30 - 08:00 0.50 BOPSUR P PRE HOLD PJSM TO STAB INJECTOR ON THE WELL,PT THE QTS AND OPEN UP FOR INITIAL ENTRY 08:00 - 09:30 1.50 BOPSUR P PRE PU THE INJECTOR AND STAB ON THE WELL PT THE QTS,GOOD TEST OPEN THE SSV,SWAB&MASTER VALVES TO A CLOSED CHOKE NO PRESSURE,LINE UP TO CIRC METH ACROSS THE TOP TO ENSURE THE HOLE IS FULL HOLE IS FULL SHUT DOWN AND FLOW CHECK THE WELL FOR 15 MIN AS PER THE WELL PLAN GOOD NO FLOW,PUMP ACROSS THE TOP TO ENSURE THE HOLE IS STILL FULL NO LOSSES 09:30 - 13:00 3.50 BOPSUR N SFAL PRE ET'S STILL WORKING ON THE IN MM, NORDICS FLUID MANAGEMENT POLICY STATES THAT WE ARE ALLOWED TO TAKE RETURNS TO OUTSIDE TANK ONLY IF THE MICRO MOTION MASS FLOW METER IN AND OUT ARE READING CORRECTLY.SO WE ARE SHUT DOWN UNTIL THE ET'S CAN FIX THE IN MICRO MOTION. 13:00 - 13:20 0.33 BOPSUR P PRE IN MM REPLACED AND AND FLOW CHECKED HOLD PJSM TO REMOVE THE INJECTOR AND MU THE WS BHA Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 6 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UW: li Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs i Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:20 - 14:00 0.67 WHIP P WEXIT REMOVE THE INJECTOR FROM THE WELL AND MU THE WS BHA 14:00 - 14:25 0.42 WHIP P WEXIT BHA MU TO COIL&INJECTOR STABBED ON THE WELL,PT THE QTS 14:25 - 15:00 0.58 WHIP N SFAL WEXIT QTS TESTED GOOD,WO BHI COMMS ISSUE WITH TOOL 15:00 - 16:45 1.75 WHIP P WEXIT RIH 16:45 - 17:00 0.25 WHIP P . WEXIT GETTING A LITTLE GAS BACK,PINCH THE CHOKE BACK ALITTLE A AND CONTINUE RIH 17:00 - 18:45 1.75 WHIP P WEXIT STOP AT 8700'TO CIRC OUT GAS BEFORE RIH INTO THE TOP THE 3-1/2 WITH THE WS CALL FOR ANOTHER TRUCK OF KCL JUST INCASE WE NEED MORE FLUID TO CIRC OUT GAS 18:45 - 19:15 0.50 WHIP P WEXIT OBSERVE 1:1 RETURNS-W/NO GAS AT BOTTOMS UP. SWAP FLUIDS TO MUD. RIH TO LOG TIE IN. 19:15 - 20:30 1.25 WHIP P WEXIT RUN TIE IN PASS AT 9340'. IN MM 1.0 BPM/ OUT MM 1.0 BPM/CIRC P 1110 PSI. CIRC PRESSURES CLIMBING WITH MUD IN THE HOLE-REDUCE RATE TO 0.80 IN MM/0.80 OUT MM/CIRC P 1070 PSI. OBSERVE MININMAL GAS RETURNS AT SURFACE. APPLY-4.5'CORRECTION. 20:30 - 21:30 1.00 WHIP P WEXIT PU TO 8780'&LOG CCL DOWN TO PBTD AT 9495'. 21:30 - 22:15 0.75 WHIP P WEXIT PU PAST SET DEPTH,RIH TO 9462'(TOWS AT 9452')ORIENT TO 178°ROHS. CONFIRM COLLAR DEPTHS ON CCL LOG. UPPER COLLAR AT 9444'. MOVE SET DEPTH DOWN 2'TO HAVE 8'STANDOFF FROM UPPER COLLAR. PRESSURE UP ON COIL&SEE SHEAR OFF AT 4100 PSI. SET 4K DOWN ON WHIPSTOCK TO CONFIRM SET. 22:15 - 23:45 1.50 WHIP P WEXIT PU TO 9439'&CIRCULATE KCL OUT OF THE HOLE OUT TO TT. KEEP MUD IN HOUSE& CBU THROUGH MGS @ 3BPM/4000 PSI. BLEED OFF IA FROM 920 PSI TO 500 PSI. 1.5 BBLS CRUDE RETURNED. 23:45 - 00:00 0.25 WHIP P WEXIT FLOWCHECK WELL-NO FLOW. 7/23/2013 00:00 - 02:00 2.00 WHIP P WEXIT POOH W/WHIPSTOCK SETTING BHA. HOLD PJSM FOR LD/MU BHA. FLOWCHECK AT200'- NO FLOW.BUMP UP INTO LUBRICATOR& POP OFF. 02:00 - 02:40 0.67 WHIP P ■ WEXIT BLOW DOWN MWD TOOLS&LD WHIPSTOCK SETTING BHA. LOAD OUT BTT SETTING TOOL DOWN BEAVER SLIDE. 02:40 - 02:55 0.25 STWHIP P WEXIT HOLD PJSM FOR PU INJECTOR&MU TOOLS. 02:55 - 03:30 0.58 STWHIP P WEXIT MU WINDOW MILLING BHA:2.804"WINDOW MILL,2.80"GO STRING REAMER,2-1/8" STRAIGHT XTREME MOTOR,2 JTS 2-1/16" CSH,FVS,BLIND SUB,DGS,DPS,EDC,P&C, WEAR SUB,LQC,UQC,CTC. GAUGE WINDOW MILL AT 2.8"NOGO,2.81"GO& STRING REAMER AT 2.79"NOGO,2.80"GO. 03:30 - 03:45 0.25 STWHIP P WEXIT STAB ON INJECTOR&PRESSURE TEST OTS LOW TO 250 PSI&HIGH TO 3500 PSI-GOOD TESTS. Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 7 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: 12/8/1979 12.00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table t 66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ' Description of Operations (hr) (ft) i 03:45 - 05:40 1.92 STWHIP P WEXIT RIH W/WINDOW MILLING BHA. 05:40 - 06:05 0.42 STWHIP N DFAL 8,783.0 WEXIT TAGGED UP ON X NIPPLE ON TRIP IN HOLE. LOST MWD TOOLS. PU SLOW WHILE MWD HAND CHECKS TOOLS. PERFORM DIAGNOSTICS ON MWD TOOLS. TOOLS NOT WORKING-NO POWER. POOH W/TOOLS. 06:05 - 07:35 1.50 STWHIP N DFAL 8,783.0 WEXIT FOW CHECK WELLAND POOH W/WINDOW MILLING BHA TO INSPECT THE BHA 07:00 PJSM TO PULL THE BHA AND CHECK TOOLS 07:35 - 07:45 0.17 STWHIP N DFAL 8,783.0 WEXIT FLOW CHECK THE WELL 07:45 - 08:30 0.75 STWHIP N DFAL 8,783.0 WEXIT GOOD NO FLOW,TAG UP,REMOVE THE INJECTOR AND PULL THE BHA BHA LAID DOWN AND THE PROBLEM APPEARS TO BE IN THE UQC 08:30 - 09:20 0.83 STWHIP N DFAL 8,783.0 WEXIT REMOVE THE FLOW SUB ON THE UQC AND FOUND THE ELINE PULLED OUT OF THE HEAD CTS SUPERVISOR DISCUSSING PLAN FORWARD WITH HIS MANAGER 09:20 - 09:40 0.33 STWHIP N DFAL 8,783.0. WEXIT HOLD PJSM TO PUMP SLACK MANAGEMENT 09:40 - 10:10 0.50 STWHIP N DFAL 8,783.0 WEXIT MEG TEST ELINE TO ENSURE ITS OK BEFORE PUMPING SLACK 10:10 - 11:00 0.83 STWHIP' N DFAL 8,783.0 WEXIT GOOD TEST ON ELINE STAB ON WELL CLOSE THE SWAB&MASTER VALVES PT THE QTS PUMP SLACK BACK WITH FRESH WATER 11:00 - 11:20 0.33 STWHIP N DFAL 8,783.0 WEXIT PUMPED 35 BBLS AND SOUNDED LIKE GOOD MOVEMENT ON THE ELINE SHUT DOWN THE PUMP AND OPEN THE SWAB&MASTER VALVES AGAINST A CLOSED CHOKE TO CHECK FOR PRESSURE NO PRESSURE,OPEN THE CHOKE TO CHECK FOR FLOW 11:20 - 12:00 0.67 STWHIP N DFAL 8,783.0 WEXIT GOOD NO FLOW,PU THE INJECTOR AND CUT PIPE TO FIND WIRE 12:00 - 13:30 1.50 STWHIP N DFAL 8,783.0 WEXIT CUT 100'AND NO WIRE,MU A CTC TO PUMP SLACK FORWARD SEAM RIPPER BROKE,RUN TO N2 TO GET PARTS OR THEIR SEAM RIPPER 13:30 - 14:15 0.75 STWHIP N DFAL 8,783.0 WEXIT MU THE CTC,PT,MU A 5'STINGER AND NOZZLE TO PUMP SLACK FORWARD 14:15 - 14:45 0.50 STWHIP N DFAL 8,783.0 WEXIT PUMP SLACK FORWARD ,14:45 - 15:45 1.00 STWHIP N DFAL 8,783.0 WEXIT SHUT DOWN THE PUMP,PU THE INJECTOR AND MU THE UQC 15:45 - 16:15 0.50 STWHIP N DFAL 8,783.0 WEXIT HOLD PJSM TO MU THE WINDOW MILLING BHA 16:15 - 18:05 1.83 STWHIP N DFAL 8,783.0 WEXIT PT THE QTS AND RIH 18:05 - 19:30 1.42 STWHIP P WEXIT TAG X-NIPPLE AGAIN AT SAME DEPTH,PU AND START MOTOR TO MILL THROUGH. MULTIPLE STALLS AT 8783.7'MD. MADE CALL TO OPERATIONS SUPERINTENDENT TO DISCUSS OPTIONS. OPERATIONS SUPERINTENDENT DIRECTED TO PERFORM CCL LOG FROM STALL DEPTH TO ABOVE JEWELRY IN PARENT WELL. Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 8 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 'X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM I Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 20:30 1.00 STWHIP P WEXIT PERFORM CCL LOG FROM 8783.7'TO 8400'. CORRELATE LOG WITH TUBING TALLIES FROM PREVIOUS WELLBORES. BASED ON CCL DEPTHS OF JEWELRY FROM PREVIOUS WELLS IT APPEARS THAT THE MILLING BHA IS HANGING UP IN THE TOP OF THE 3-3/16" LINER. DETERMINED THAT WELL WAS LAST •DRIFTED WITH A 2.74"X 25'DRIFT TO 9900' ON 6/27/2013. DISCUSSED CCL WITH OPERATIONS SUPERINTENDENT AND ODE. DECISION WAS MADE TO POH AND L/D THE 2.80"WINDOWAND STRING MILLS AND P/U 2.74"WINDOWAND STRING MILLS. 20:30 - 22:15 1.75 STWHIP P WEXIT FLOWCHECK WELLAND POH F/8400'TO 190' AT 98 FPM,PUMPING 1.02 BPM W/1780 PSI. 22:15 - 22:30 0.25 STWHIP P WEXIT FLOWCHECK WELL AT 190'. STAND BACK INJECTOR. 22:30 - 22:45 0.25 STWHIP P WEXIT L/D BHA. MILLS GAUGED 2.81"GO 2.80" NO-GO. 22:45 - 23:00 0.25 STWHIP P WEXIT M/U NEW MILLING BHA W/NEW HCC 2.74" WINDOW AND STRING MILLS. MILLS GAUGED 2.75"GO AND 2.74"NO-GO. 23:00 - 00:00 1.00 STWHIP P WEXIT STAB COIL.GET ON WELL.TEST QTS.RIH W/ MILLING BHA. 7/24/2013 00:00 - 02:00 2.0,0 STWHIP P WEXIT RIH W/MILLING BHA#4 AND LOG TIE IN(-6' CORRECTION). TAG WHIPSTOCK AT 9453' PUMPS OFF. 02:00 - 0630 4.50 STWHIP P WEXIT F/S=2750 PSI AT 1.56 BPM. RIH SLOWLY.LIGHTLY TAG PINCH POINT AT 9452.8' TIME MILL 1ST FT WINDOW AT 1 FPH PER BTT REP. WOB=1.3K-1.7K.150 TO 200 PSI MOTOR WORK. MM IN=1.56 BPM.MM OUT=1.55 BPM MW=8.73 PPG IN.MW=8.59 PPG OUT PVT=333 BBLS.IA=392 PSI.OA=0 PSI.ECD =9.43 PPG. 06:30 - 07:00 0.50 STWHIP P WEXIT CONTINUE WINDOW MILLING OPS FREE SPIN=2750 PSI AT 1.56 BPM RATE IN=1.55 BPM RATE OUT=1.55 BPM ROP=1 FPH WOB=1.01 K CIRC PSI= 2878 PSI MW IN=8.72 PPG MW OUT=8.58 PPG ECD =9.44 PPH IAP=626 PSI OAP=49 PSI PVT=334 BBLS 07:00 - 08:15 1.25 STWHIP P -1 WEXIT WOB DROPPED BELOW 1K WOB AND LOOKS LIKE WE ARE MILLING FORMATION WOB IS LOW<1KAND DRILLING LIKE FORMATION W1NDOW=9452.8 TO 9457' '08:15 09:20 1.08 STWHIP P WEXIT CONTINUE TIME MILLING FOR THE LAST FOOT JUST IN CASE WE ARE STILL MILLING METAL,AS PER BTT REP 09:20 - 10:20 1.00 STWHIP ' P WEXIT MILLING FORMATION 10:20 - 10:30 0.17 STWHIP P WEXIT STALLAT 10'OF RATHOLE,PU AND DRESS WINDOW AS PER WELL PLAN 10:30 - 11:30 1.00 STWHIP P WEXIT MAKE 3 PASSES SAMPLE FROM RATHOLE IS 90%FORMATION Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 9 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase , Description of Operations (hr) _ (ft) 11:30 - 11:45 0.25 STWHIP P WEXIT WINDOW LOOKS CLEAN,DRY DRIFT IN BOTH DIRECTIONS 11:45 - 12:00 0.25 STWHIP P WEXIT 'DRY DRIFTS ARE CLEAN,FLOW CHECK WELL 12:00 - 13:45 1.75 STWHIP P WEXIT GOOD NO FLOW,OPEN THE EDC AND POOH AT MAX RATE WHILE POOH ONE OF THE RIG HANDS CHECKED THE TREE BOLTS FOR TORQUE AND GOT SMALL AMOUNT OF MOVEMENT FROM ONE OF THE BOLTS BELOW THE MASTER.I CALLED MY SUPERINTENDENT AND THEN CALLED THE VALVE SHOP TO LET THEM KNOW WE WOULD NEED TO RETORQUE THE TREE BOLTS AND WE WOULD NEED TO SET A TWC TO RE-TEST THE TREE AFTER THE RETORQUE. 13:20 HOLD PJSM AT 2500'TO REMOVE THE INJECTOR AND LD THE MILLING BHA 13:45 - 14:00 0.25 STWHIP P WEXIT FLOW CHECK WELL 14:00 - 15:00 1.00 STWHIP P WEXIT GOOD NO FLOW,TAG UP AND REMOVE THE INJECTOR AND LD THE BHA MILLS GAUGED 2.74 GO 2.73 NO-GO, WINDOW MILL HAS WEAR ON THE FACE 15:00 - 15:30 0.50 STWHIP P WEXIT MU THE QTS AND UNSTAB AT THE 7"OTIS CONNECTION SO THE VALVE CREW CAN RU THEIR LUBRICATOR TO SET THE TWC VALVE CREW ON LOCATION,HOLDING PJSM TO RU AND SET TWC 15:30 - 17:00 1.50 STWHIP P WEXIT LOAD VALVE CREW LUBRICATOR ON THE RIG RIG UP TWC AND STAB ON SET TWC 17:00 - 17:45 0.75 STWHIP P WEXIT RETORQUE ALL TREE BOLTS TO API SPECS 17:45 - 19:00 1.25 STWHIP P WEXIT TREE BOLTS TORQUED TO API SPECS,PREP TO TEST TREE. PTESSURE TEST LUBRICATOR TO 250/3500 PSI.PULL TWC. FLOWCHECK.FILL HOLE. CLOSE MASTER AND SWAB VALVES.R/D LUBRICATOR. 19:00 - 20:00 1.00 STWHIP P WEXIT P/U INJECTOR.CHANGE OUT PACK-OFFS. STAB INJECTOR.P/T LUBRICATOR AND PACK-OFFS 250/3500 PSI. OPEN MASTER AND SWAB VALVES. FLOW CHECK WELL. FILL HOLE. 20.00 - 21:30 1.50 DRILL P PROD1 GET OFF WELL.STAND BACK INJECTOR. M/U 3"BUILD BHA.STAB COIL.GET ON WELL. TEST QTS. 21:30 - 23:30 2.00 DRILL P PROD1 RIH W/3"BUILD BHA ON COIL.PUMPINT 0.31 BPM W/870 PSI 23:30 - 00:00 0.50 DRILL P PROD1 LOG TIE-IN F/9350'10 9470'. (-4.5' CORRECTION) 7/25/2013 00:00 - 00:45 0.75 DRILL P PROD1 CONTINUE TO LOG IN THE HOLE AS PER GEO AND DD TO 9470'MD. Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 10 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) . 00:45 - 06:05 5.33 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE SECTION F/ 9470'MD TO 9630'MD. DHWOB:0.5-1.5K-LBS PUMP RATE:1.72 BPM, MM OUT:1.75 BPM PUMP PRESSURE:3270 PSI,DIFF PRESSURE: 200 PSI MUD WEIGHT IN/OUT:8.73/8.61 PPG. i PVT/IA/OA:340 BBL/638 PSI/50 PSI ECD:9.51 PPG 06:05 - 06:20 0.25 DRILL P PROD1 CREW CHANGE,STOP DRILLING PU 100'TO CHECK PARAMETERS THE OBTAIN SPR'S 06:20 - 10:30 4.17 DRILL P PROD1 CONTINUE DRILLING AHEAD IN WHAT LOOKS LIKE Z3 FREE SPIN=3100 PSI AT 1.75 BPM IRATE IN=1.78 BPM RATE OUT=1.77 BPM ' ROP=8 FPH WOB=1.31 K CIRC PSI= 3198 PSI MW IN=8.75 PPG MW OUT=8.59 PPG ECD =9.51 PPH IAP=769 PSI OAP=52 PSI PVT=334 BBLS 10:30 - 13:45 3.25 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3100 PSI AT 1.75 BPM RATE IN=1.83 BPM RATE OUT=1.85 BPM ROP=13 FPH WOB=1.61 K CIRC PSI= 3219 PSI MW IN=8.74 PPG MW OUT=8.58 PPG ECD =9.53 PPH , 1- I 'IAP=825 PSI OAP=63 PSI PVT=330 BBLS 13:45 - 14:20 0.58 I DRILL P ! I PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3100 PSI AT 1.75 BPM RATE IN=1.77 BPM RATE OUT=1.78 BPM ROP=30 FPH WOB=1.43 K CIRC PSI= 3380 PSI MW IN=8.74 PPG MW OUT=8.58 PPG ECD =9.54 PPH IAP=958 PSI OAP=68 PSI PVT=326 14:20 - 14:30 0.17 DRILL P PROD1 RU CREW IS ON LOCATION TO RU THE CIRCULATION IRON TO THE WING VALVE POOH TO THE WINDOW AND CIRC A BOTTOMS UP 14:30 - 15:15 0.75 DRILL P 1 I PROD1 LTT THE WING VALVE,GOOD PT TO 3500 PSI CONTINUE CIRCULATING A BOTTOMS UP ! BLEED IA FROM 1000 PSI TO 500 PSI 15:15 - 15:45 0.50 DRILL P ' PROD1 BOTTOMS UP IS CLEAN,SHUT DOWN TO LET THE RU CREW RU THE CIRC HARDLINE ON THE WING VALVE 15:45 - 15:50 0.08 DRILL P PROD1 RU CREW IS FINISHED INSTALLING THE CIRCULATION HARDLINE ON THE WIG VALVE i AND IT HAS BEEN PRESSURE TESTED TO 3700 PSI 15:50 - 16:45 0.92 DRILL P PROD1 PUMP A 20 BBL HI VIS PILL TO CLEAN OUT THE 128'OF 9-5/8 CASING ABOVE THE 4-1/2 LINER TOP AND CHASE UP INTO THE 4-1/2 TUBING 16:45 - 17:05 0.33 DRILL P PROD1 BOTTOMS UP BROUGHT UP-20%MORE CUTTINGS AND SOME PARAFIN,CLOSE THE ' EDC AND LOG TIE 17:05 - 17:20 0.25 DRILL PPROD1 CORRECT DEPTH+2'AND RIH TO BOTTOM I Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 11 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date 7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) _ Date From-To Hrs 1 Task Code NPT NPT Depth Phase Description of Operations (h 17:20 - 19:30 2.17rDRILL P (ft) PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3100 PSI AT 1.75 BPM RATE IN=1.84 BPM RATE OUT=1.85 BPM ROP=30 FPH WOB=1.56 K CIRC PSI= 3501 PSI MW IN=8.75 PPG MW OUT=8.58 PPG ECD =9.51 PPH IAP=483 PSI OAP=70 PSI PVT=327 DECISION MADE TO POH DUE TO MULTIPLE STALLS,LOW ROP,AND INABILITY TO GET REQUIRED BUILD RATE. 19:30 - 20:30 1.00 DRILL ' P PROD1 FLOWCHECK WELL. POH TO WINDOW. OPEN EDC,JET WHIPSTOCK TRAY. 20:30 - 22:30 2.00 DRILL i P PROD1 FLOWCHECK WELL.POH TO SURFACE. JOG DOWN F/250'10 450'AND BACK UP. STAND BACK INJECTOR. 22:30 - 00:00 1.50 DRILL ' P • ' PROD1 'PJSM. BREAK AND UD BHA. BIT GRADED 4-2. M/U NEW 3"BUILD BHA INCLUDING NEW BHI 2-3/8"ULTRA X/LS MOTOR AND HYC.2.7" X 3"BI-CENTER BIT. STAB COIL. GET ON _ WELL.TEST OTS. 7/26/2013 00:00 - 01:00 1.00 DRILL P PROD1 RIH W/BHA#6 BUILD BHA TO 1225'MD. MWD TOOLS SHUT DOWN AT 1225'. i 01:00 - 05:15 4.25 DRILL N SFAL 9,747.0 • PROD1 TROUBLESHOOT MWD SURFACE CABLES. FOUND ONE BAD MWD CABLE. CHANGED OUT BAD CABLE PLUGGED BACK INTO COIL ELINE. MWD STILL NOT WORKING. CONTINUE TROUBLESHOOTING. LOCK OUT COIL REEL. TEST CONNECTIONS FROM MWD TO ELINE. IT APPEARS THAT THE COLLECTOR IN THE COIL REEL IS BAD. ALL LINES UP TO COLLECTOR TEST GOOD. CANNOT GET A GOOD TEST THROUGH THE COLLECTOR. WAIT FOR SCHLUMBERGER TO CHANGE OUT COLLECTOR. POH TO SURFACE. POP OFF INJECTOR AND CHECK UQC CABLE CONNECTION. REPLACE COLLECTOR. MEG TEST THROUGH NEW COLLECTOR. MEG TEST THROUGH MWD CABLES TO UQC-ALL GOOD. STAB COIL.GET ON WELL.TEST QTS. 05:15 - 07:00 1.75 DRILL P PROD1 RIH W/BHA#6 93 FPM PUMPING 2.05 BPM WI 2850 PSI. 07:00 - 07:25 0.42 DRILL P PROD1 CLOSE EDC AND LOG TIE IN 07:25 - 07:30 0.08 DRILL P PROD1 CORRECT DEPTH-3'AND RIH 07:30 - 07:40 0.17 DRILL P PROD1 OBTAIN SPR'S 07:40 - 09:40 2.00 DRILL P PROD1 BACK ON BOTTOM DRILLING CONTINUE DRILLING AHEAD FREE SPIN=3113 PSI AT 1.80 BPM RATE IN=1.80 BPM RATE OUT=1.81 BPM ROP=39 FPH WOB=1.55 K CIRC PSI= 3431 PSI MW IN=8.73 PPG MW OUT=8.59 PPG ECD =9.58 PPH IAP=112 PSI OAP=65 PSI PVT=322 BBLS Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 12 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 I End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:40 - 15:40 6.00 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3113 PSI AT 1.80 BPM RATE IN=1.83 BPM RATE OUT=1.82 BPM ROP=38 FPH WOB=2.28 K CIRC PSI= 3450 PSI MW IN=8.73 PPG MW OUT=8.60 PPG ECD =9.58 PPH IAP=398 PSI OAP=66 PSI PVT=321 BBLS SLOW DRILLING VERY EASY TO STALL IF ROP IS OVER 20 FPH 15:40 - 15:50 0.17 DRILL P PROD1 DRILLED 150',PU TO CHECK PARAMETERS 15:50 - 20:00 4.17 DRILL P PROD1 EVERYTHING LOOKS GOOD,CONTINUE !DRILLING CONTINUE DRILLING AHEAD FREE SPIN=3113 PSI AT 1.80 BPM RATE IN=1.80 BPM RATE OUT=1.79 BPM ROP=36 FPH WOB=1.76 K CIRC PSI= 3526 PSI MW IN=8.73 PPG MW OUT=8.59 PPG ECD =9.62 PPH IAP=630 PSI OAP=77 PSI PVT=317 BBLS 20:00 - 20:15 0.25 DRILL P PROD1 OBTAIN SPR'S. 20:15 - 21:15 1.00 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE SECTION F/ 9950'MD TO 9957'MD. DHWOB:0.5-2.5K-LBS PUMP RATE:1.76 BPM, MM OUT:1.76 BPM PUMP PRESSURE:3050 PSI,DIFF PRESSURE: 150 PSI MUD WEIGHT IN/OUT:8.73/8.58 PPG. PVT/IA/OA:310 BBL/649 PSI/85 PSI ECD:9.54 PPG SLOW DRILLING W/MULTIPLE STALLS CHIRT CONTENT-60%. 21:15 - 21:45 0.50 DRILL P PROD1 WIPER TO WINDOWAT 30 FPM,PUMPING 1.90 BPM W/3395 PSI. 21:45 - 00:00 2.25 DRILL P PROD1 FLOWCHECK WELL. OPEN EDC. JET WHIPSTOCK TREY. POH TO SURFACE AT 100 FPM,PUMPING 2.44 BPM W/3500 PSI. 7/27/2013 00:00 - 00:45 0.75 DRILL P PROD1 FLOWCHECK WELL. UNSTAB COIL. STAND BACK INJECTOR. BREAK AND UD BHA#6. 00:45 - 01:00 0.25 DRILL P PROD1 FUNCTION TEST BOPE F/REMOTE PANEL IN OPS CAB. • 01:00 - 02:00 1.00 DRILL P PROD1 M/U BUILD BHA#7 INCLUDING NEW MWD TOOLS AND NEW HCC 2.7"X 3"BIT. STAB COIL. GET ON WELL.TEST QTS. 02:00 - 03:45 1.75 DRILL P PROD1 RIH W/BHA#7 ON COIL F/72'TO 9442'MD AT 90 FPM PUMPING 2.42 BPM W/3600 PSI. 03:45 - 05:15 1.50 DRILL P PROD1 CLOSE EDC.LOG RA TAG(-4.5' CORRECTION). MAD PASS FOR RESISTIVITY AT 500 FPH PUMPING 1.88 BPM W/3250 PSI. 05:15 - 05:30 0.25 ' DRILL P PROD1 OBTAIN SPRS Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 13 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:30 - 06:20 0.83 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE SECTION F/ 9957'MD TO 10000'MD. DHWOB:0.5-2.5K-LBS PUMP RATE:1.73 BPM, MM OUT:1.73 BPM I PUMP PRESSURE:3040 PSI,DIFF PRESSURE: '100 PSI MUD WEIGHT IN/OUT:8.73/8.58 PPG. PVT/IA/OA:310 BBL/605 PSI/92 PSI ECD:9.60 PPG 06:20 - 07:00 0.67 DRILL 1i P PROD1 FREE SPIN=3030 PSI AT 1.75 BPM I RATE IN=1.74 BPM RATE OUT=1.73 BPM ROP=51 FPH WOB=0.95 K CIRC PSI= 3058 PSI MW IN=8.72 PPG MW OUT=8.59 PPG ECD I =9.62 PPH _ IAP=658 PSI OAP=92 PSI PVT=308 BBLS 07:00 - 08:00 1.00 DRILL P PROD1 FREE SPIN=3030 PSI AT 1.75 BPM RATE IN=1.74 BPM RATE OUT=1.73 BPM ROP=60 FPH WOB=1.71 K CIRC PSI= 3281 PSI MW IN=8.72 PPG MW OUT=8.61 PPG ECD =9.65 PPH IAP=687 PSI OAP=93 PSI PVT=307 BELS START TAKING 10'SAMPLES AT 10,050' LOOKING FOR THE HOT AND STOP DRILLING AT 10150'TO PUMP A BOTTOMS UP IF WE DONT SEE IT 08:00 09:30 1.50 I DRILL P PROD1 DRILLED 150',PU TO CHECK PARAMETERS I PARAMETERS LOOK GOOD FREE SPIN=3030 PSI AT 1.75 BPM RATE IN=1.74 BPM RATE OUT=1.73 BPM , ROP=60 FPH WOB=1.71 K CIRC PSI= 3281 PSI MW IN=8.72 PPG MW OUT=8.61 PPG ECD =9.65 PPH IAP=687 PSI OAP=93 PSI PVT=307 BBLS LOOKS LIKE WE ARE DRILLING IN A SHALE OR THE 14N,ROP HAS SLOWED DOWN • 09:30 - 10:35 1.08 DRILL P PROD1 STOP DRILLING FOR GEO TO LOOK AT SAMPLES AND CONSULT WITH THE TOWN IGEO POOH TO WINDOW TO CLEAN UP THE OH 10:35 - 11:00 0.42 DRILL P PROD1 GEO SAYS WE ARE GOING TO STICK TO THE PLAN,RIH TO CONTINUE DRILLING 11:00 - 13:00 2.00 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3030 PSI AT 1.75 BPM RATE IN=1.80 BPM RATE OUT=1.78 BPM ROP=35 FPH WOB=3.62 K CIRC PSI= 3402 PSI MW IN=8.74 PPG MW OUT=8.61 PPG ECD 1=9.65 PPH IAP=757 PSI OAP=93 PSI PVT=304 BBLS Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 14 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code , NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 13:30 0.50 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3030 PSI AT 1.75 BPM RATE IN=1.80 BPM RATE OUT=1.78 BPM ROP=20-50 FPH WOB=2.80 K CIRC PSI= 3435 PSI MW IN=8.76 PPG MW OUT=8.61 PPG ECD =9.67 PPH IAP=782 PSI OAP=99 PSI PVT=304 BBLS 13:30 - 14:00 0.50 DRILL P PROD1 HOLD KWD DRILL SIMULATED AN INCREASE IN FLOW RATE FROM THE WELL,THE NORDIC DRILLER ASKED THE CTS OPERATOR TO PU OFF BOTTOM AND SHUT DOWN HIS PUMP.THE FLOOR HAND AT THE SHAKER SAID THAT THE WELL WAS CONTINUING TO FLOW.THE DRILLER ASKED THE CTS OPERATOR TO INCREASE HIS PACK OFFS AND CLOSE THE HCR.THE DRILLER SIMULATED THAT THE WELL HEAD PRESSURE HAD INCREASED TO 200 PSI AND CALLS WERE MADE AT THIS POINT TO BP MANAGEMENT.FOR FURTHER INSTRUCTIONS 14:00 - 14:30 0.50 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3030 PSI AT 1.75 BPM RATE IN=1.78 BPM RATE OUT=1.78 BPM ROP=85 FPH WOB=2.45 K CIRC PSI= 3380 PSI MW IN=8.76 PPG MW OUT=8.61 PPG ECD =9.73 PPH IAP=793 PSI OAP=99 PSI PVT=303 BBLS 14:30 - 15:15 0.75 DRILL P PROD1 DRILLED 150'PU TO CHECK PARAMETERS PARAMETERS ARE OK,CONTINUE DRILLING AHEAD FREE SPIN=3030 PSI AT 1.75 BPM RATE IN=1.78 BPM RATE OUT=1.78 BPM ROP=85 FPH WOB=2.45 K CIRC PSI= 3380 PSI MW IN=8.76 PPG MW OUT=8.61 PPG ECD =9.73 PPH IAP=793 PSI OAP=99 PSI PVT=303 BBLS 15:15 - 15:25 0.17 DRILL P PROD1 DD SAYS WE HAVE GONE AS FAR AS WE CAN WITH THIS MOTOR AND NEED TO PULL OUT TO ADJUST IT DOWN PU OFF BOTTOM TO CLEAR THE OH THEN FLOW CHECK THE WELL 15:25 - 16:00 0.58 DRILL P PROD1 GOOD NO-FLOW,POOH TO WINDOW 16:00 - 16:10 0.17 DRILL P PROD1 FLOW CHECK WELL 16:10 - 17:55 1.75 DRILL P PROD1 GOOD NO FLOW,POOH 17:55 - 18:10 0.25 DRILL P PROD1 FLOW CHECK WELL 18:10 - 19:00 0.83 DRILL P PROD1 GET OFF WELL.UNSTAB COIL.STAND BACK INJECTOR. BREAKAND UD BHA#7. ADJUST MOTOR AKO TO 1.15°. BIT GRADED 2-1. 19:00 - 22:30 3.50 DRILL P PROD1 PJSM. CHROME MANAGEMENT. CUT OFF COIL CONNECTOR. CUT 100'OF COIL. INSTALL COIL CONNECTOR. PULL TEST CTC TO 40 K-LBS. INSTALL BHI UQC. PT CTC AND UQC TO 250/3800 PSI. M/U LUBRICATOR GET ON WELL AND PT SAME TO 250/3800 PSI. ' GET OFF WELLAND STAND BACK INJECTOR. Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 15 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 23:30 1.00 DRILL P PROD1 PJSM. MU LATERAL BHA#8. STAB COIL.GET ON WELL.TEST QTS TO 250/3800 PSI. 23:30 - 00:00 0.50 DRILL P PROD1 RIH W/BHA#8 AT 100 FPM PUMPING 2.41 BPM W/3225 PSI. 7/28/2013 100:00 - 01:45 1.75 DRILL P PROD1 I CONTINUE TO RIH W/BHA#8 AT 100 FPM PUMPING 2.41 BPM W/3225 PSI. 01:45 - 04:00 2.25 DRILL N DPRB 10,130.0 I PROD1 CLOSE EDC AND CONTINUE TO RIH W/BHA #8. LOG RA TAG(-6'CORRECTION). RIH TO 10130'. UNABLE TO GET THROUGH SHALE SECTION AT 10130'. MAKE MULTIPLE ATTEMPTS. VARY PUMP RATES AND RUNNING SPEED. SET DOWN 1.5-2.5 K-LBS PUMPING AT 1.79 BPM. FREE SPIN AT 3050 PSI. UP TO 400 PSI MOTOR WORK.ROP-60 FPM. CALLED OPERATIONS SUPERINTENDENT. CONCERNED WITH INADVERTENTLY SIDETRACKING WELL. DECISION MADE TO SET AN ALUMINUM BILLET AND SIDETRACK WELL ABOVE SHALE SECTION. 04:00 - 07:00 3.00 DRILL N DPRB 10,130.0 PROD1 WIPER TRIP TO WINDOW. START MUD SWAP WHILE RIH FROM WINDOW. WIPER TRIP BACK DOWN TO 10100'. PU HOLE INTO CASING AND FLOW CHECK WELL WHILE OPENING EDC 07:00 - 07:25 0.42 DRILL N DPRB 10,130.0 PROD1 GOOD NO FLOW,RIH AND JET ACROSS WS TRAY MU UP A HI-VIS PILL TO JET ACROSS 9-5/8 TO ENSURE THE TUBING IS CLEAN BEFORE POOH FOR THE BILLET 107:25 - 07:45 0.33 DRILL N DPRB 10,130.0 PROD1 START 25 BBL HI-VIS PILL 07:45 - 07:55 0.17 DRILL N DPRB 10,130.0 PROD1 HI-VIS PILL AT THE EDC POOH SLOW THROUGH THE 9-5/8 07:55 - 09:40 1.75 DRILL N DPRB 1 10,130.0 PROD1 HI VIS PILL OUT,POOH BOTTOMS UP FROM HI-VIS PILL FROM 9-5/8 IS CLEAN 08:20 HOLD PJSM TO LD THE BHA 09:40 - 09:50 0.17 DRILL N DPRB 10,130.0 PROD1 FLOW CHECK WELL 09:50 - 10:00 0.17 DRILL N DPRB 10,130.0 PROD1 GOOD NO FLOW,TAG UP AND REMOVE INJECTOR TO LD THE BHA 10:00 - 11:00 1.00 DRILL N DPRB 10,130.0 PROD1 WHILE POOH TO TAG UP THE INJECTOR STARTED MAKING A GRINDING NOISE THAT DID NOT SOUND NORMAL,CTS IS HAVING MECHANICS COME OUT TO INVESTIGATE TAG UP AND REMOVE INJECTOR TO LD THE BHA 11:00 - 11:45 0.75 DRILL N DPRB 10,130.0 PROD1 BHA OOH,MU THE BILLET BHA MECHANICS LUBRICATED THE BUSHINGS FOR THE TIE RODS AND THE NOISE HAS STOPPED 11:45 - 14:10 2.42 DRILL N DPRB 10,130.0 PROD1 OCN HAS BEEN APPROVED RIH WITH BILLET BHA • 14:10 - 14:30 0.33 DRILL N DPRB 10,130.0 PROD1 LOG TIE IN 14:30 - 15:00 0.50 DRILL N DPRB 10,130.0 PROD1 CORRECT DEPTH-8.5'AND CLOSE THE EDC PU WT=33K Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 16 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) .15:00 - 15:05 0.08 DRILL N DPRB 10,130.0 PROD1 STOP AT 9981.75'(BOTTOM OF THE BILLET, • TOP OF BILLET=9970'),WT CHECK=36K RIH TO 9981.75'AND PU TO 25KAND STOP, BILLET ORIENTED TO 30'LOHS PRESSURE UP TO SET BILLET,SETTING TOOL SHEARED OUT AT 3100 PSI SET DOWN 5K TO ENSURE BILLET IS SET,NO MOVEMENT 15:05 - 15:10 0.08 DRILL N DPRB 10,130.0 PROD1 PU AND WE ARE FREE FROM THE BILLET, STOP TO FLOW CHECK WELL 15:10 - 15:25 0.25 DRILL N DPRB 10,130.0 PROD1 GOOD NO FLOW,POOH TO WINDOW 15:25 - 15:30 0.08 DRILL N DPRB 10,130.0 PROD1 FLOW CHECK WELL 15:30 - 17:10 1.67 DRILL N DPRB 10,130.0 PROD1 GOOD NO FLOW,POOH AT MAX RATE 16:40 PJSM TO LD BILLET BHA AND PU THE KICK OFF BHA 17:10 - 17:20 0.17 DRILL N DPRB 10,130.0 PROD1 FLOW CHECK '17:20 - 18:00 0.67 DRILL N DPRB 10,130.0 PROD1 GOOD NO FLOW,TAG UP,REMOVE INJECTOR AND LD THE BILLET BHA 18:00 - 18:05 0.08 DRILL N DPRB 10,130.0 PROD1 HOSES FOR HOLE FILL WHILE TESTING BOP'S JUST SHOWED UP.HOLD OFF ON DEPLOYING BHA TO TEST HOLE FILL THROUGH WING 18:05 - 19:10 1.08 DRILL N DPRB 10,130.0 PROD1 CREW CHANGE,HOSES ARE RIGGED UP, BRIEF NIGHT CREW WITH TASK AFTER CHANGE OUT 19:10 19:20 0.17 DRILL N DPRB 10,130.0 PROD1 PJSM WITH NIGHT CREW TO START CIRCULATION TESTING 19:20 - 20:00 0.67 DRILL N DPRB 10,130.0 PROD1 ONLINE WITH THE CHARGE PUMP TO FEED BOTH PUMPS-STARTING C-PUMP PSI=56 PSI -ONLINE WITH PUMP#2 TO CIRC DOWN THE COIL AT 0.5 BPM TO SIMULATE WINTER OPS -OPEN UP TO PUMP 1 WITH JUST THE C-PUMP AND FLUID PACK THE LINES TO THE OUT MM -OPEN THE WING VALVE TO FLUID PACK THE STACK THROUGH AN OPEN WHITEY VALVE ON THE NIGHT CAP -RATE DROPPED FROM 1.0 BPM TO 0.4 BPM WHEN THE WHITEY WAS OPENED TO FLUID PACK THE STACK,MEANING THE WELL SHOULD TAKE WHATEVER FLUID IT NEEDS IF WE ARE ON LOSSES -OPEN WHITEY VALVE ON NIGHT CAP, PRESSURE=40 PSI AT 1.0 BPM OPEN BAKER CHOKE IN 20%INCREMENTS -20%OPEN=40 PSI AT 0.95 BPM -40%OPEN=37 PSI AT 0.87 BPM -60%OPEN=37 PSI AT 0.78 BPM -80%OPEN=37 PSI AT 0.74 BPM -100%OPEN=37 PSI AT 0.72 BPM STABILIZED AT 40 PSI AT 0.70 BPM 20:00 - 21:30 1.50 DRILL N DPRB 10,130.0 PROD1 FLUSH HOLE FILL LINES WITH FRESH WATER.BLOW DOWN LINERS.RIG DOWN HOLE FILL EQUIPMENT. 21:30 - 22:00 0.50 DRILL N DPRB 10,130.0 PROD1 HOLD PRE JOB SAFETY MEETING FOR PICKING UP BHA.MAKE UP BHA#10 KICK OFF ASSEMBLY AND RUN IN HOLE. Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 17 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 22:30 0.50 DRILL N DPRB 10,130.0 PROD1 MAKE UP COIL TO BHAAND STAB INJECTOR. TEST QUICK TEST SUB TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH- PASS. 22:30 - 00:00 1.50 DRILL N DPRB 10,130.0 PROD1 RUN IN HOLE WITH KICK OFF ASSEMBLY AT 90 FPM WITH 11K DOWN WEIGHT AT 7,300' MD.PUMP AT 1.8 BPM WITH 2300 PSI,OUT MICRO MOTION 2.1 BPM.MUD WEIGHT IN AND OUT 8.6 PPG.IA=0 PSI,OA=68 PSI. RUN INTO 8,500'MD. 7/29/2013 00:00 - 00:30 0.50 DRILL N DPRB 10,130.0 PROD1 RUN IN TO WINDOW AT 9,452'MD AND GO THROUGH.RUN TO 9,480 PSI FOR TIE IN. 00:30 - 00:45 0.25 DRILL N DPRB 10,130.0 PROD1 TIE IN AT 9,480'.PUMP AT 0.35 BPM WITH 1015 PSI.RUN AT 1,7 FOOT PER MINUTE WITH 16K DOWN WEIGHT.CORRECTION OF MINUS 6.5 FEET. 00:45 - 01:30 0.75 DRILL N DPRB 10,130.0 PROD1 RUN IN HOLE TO 9,960'MD AT 16 FPM WITH 16K DOWN WEIGHT.PUMP AT 1.75 BPM WITH 2780 PSI.IA= 45 PSI,OA=70 PSI.VOLUME 322 BBLS.KICK PUMPS OFF RUN IN AND TAG AT 9,972'MD,SET 3K DOWN.PICK UP TO . 9,965'MD.KICK PUMPS ON AT 1.75 BPM WITH 2,750 PSI.RUN IN AND TAG AT 9,971'MD. 01:30 - 05:00 3.50 DRILL N DPRB 10,130.0 PROD1 KICK OFF OF BILLET HIGH SIDE AT 1.7 BPM WITH 2780 PSI.DRILL OFF AT 1 FOOT PER HOUR.DOWN WEIGHT 18K,WITH 0.2 WOB. STALL OUT ON FIRST TENTH.PICK UP,GO BACK DOWN AND BACK OFF TO 0.5 FOOT PER HOUR TO ESTABLISH CUTTING PATTERN.ESTABLISH PATTERN AND BRING RATE BACK UP TO 1.0 FOOT PER HOUR. KICKED OFF AT 9,976'MD.DRILL TO 9,992' MD.PERFORM DRY DRIFT FROM BOTTOM AT 9,992'MD TO TOP OF BILLET AT 9,971'MD AND BACK TO BOTTOM.CONTINUE TO DRILL AHEAD AT 1.75 GPM WITH 2890 PSI.WOB 1.1K WITH 15K DOWN WEIGHT. 05:00 - 06:25 1.42 DRILL N DPRB 10,130.0 PROD1 PERFORMED KICK WHILE DRILLING DRILL WITH WELL CONTROL ASSESSOR.NO PROBLEMS DURING DRILLL.HELD AAR. 06:25 - 06:35 0.17 DRILL N DPRB 10,130.0 PROD1 OBTAIN SPR'S 06:35 - 08:30 1.92 DRILL N DPRB 10,130.0 PROD1 CONTINUE DRILLING FREE SPIN=2860 PSI AT 1.78 BPM RATE IN=1.78 BPM RATE OUT=1.78 BPM ROP=90 FPH WOB=1.78 K CIRC PSI= 2966 PSI MW IN=8.75 PPG MW OUT=8.61 PPG ECD =9.52 PPH IAP=433 PSI OAP=79 PSI PVT=310 BBLS 08:30 - 08:40 0.17 DRILL N DPRB 10,130.0 PROD1 BUILD LANDED,PU TO CLEAR THE OH OF CUTTINGS BEFORE FLOW CHECKING TO POOH 08:40 - 08:50 0.17 DRILL N DPRB 10,130.0 PROD1 FLOW CHECK WELL ON BOTTOM 08:50 - 09:25 0.58 DRILL N DPRB 10,130.0 PROD1 GOOD NO FLOW,POOH TO WINDOW 09:25 - 09:30 0.08 DRILL N DPRB 10,130.0 PROD1 ABOVE THE WINDOW,FLOW CHECK THE WELL 09:30 - 11:30 2.00 DRILL N DPRB 10,130.0 PROD1 GOOD NO FLOW,POOH 11:30 - 11:40 0.17 DRILL N DPRB 10,130.0 PROD1 FLOW CHECK WELL AT 200' Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 18 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:40 - 12:20 0.67 DRILL N DPRB 10,130.0 PROD1 GOOD NO FLOW,TAG UP,LD THE DRILLING BHAAND ADJUST THE MOTOR DOWN TO 1.3° 12:20 - 12:45 0.42 DRILL N DPRB 10,130.0 PROD1 MU THE LATERAL BHA 12:45 - 14:10 1.42 DRILL N DPRB 10,130.0 PROD1 STAB ON WELL,PT THE QTS AND RIH 14:10 - 15:05 0.92 DRILL N DPRB 10,130.0 PROD1 CLOSE THE EDC AND LOG TIE IN 15:05 - 15:25 0.33 DRILL N DPRB 10,130.0 PROD1 CORRECT DEPTH-8.5'AND RIH TO BOTTOM 15:25 - 15:40 0.25 DRILL N DPRB 10,130.0 PROD1 OBTAIN SPR'S BEFORE DRILLING • 15:40 - 16:25 0.75 DRILL N DPRB 10,130.0 PROD1 BACK ON BOTTOM DRILLING FREE SPIN=3100 PSI AT 1.84 BPM RATE IN=1.84 BPM RATE OUT=1.83 BPM ROP=54 FPH WOB=1.57 K CIRC PSI= 3208 PSI MW IN=8.78 PPG MW OUT=8.62 PPG ECD =9.60 PPH IAP=288 PSI OAP=82 PSI PVT=309 BBLS 16:25 - 17:00 0.58 DRILL N DPRB 10,130.0 PROD1 CONTINUE DRILLING FREE SPIN=3100 PSI AT 1.84 BPM RATE IN=1.80 BPM RATE OUT=1.80 BPM ROP=92 FPH WOB=2.12 K CIRC PSI= 3303 PSI MW IN=8.78 PPG MW OUT=8.63 PPG ECD =9.60 PPH IAP=399 PSI OAP=83 PSI PVT=308 BBLS 17:00 - 17:40 0.67 DRILL N DPRB 10,130.0 PROD1 CONTINUE DRILLING FREE SPIN=3100 PSI AT 1.84 BPM RATE IN=1.84 BPM RATE OUT=1.84 BPM ROP=87 FPH WOB=2.54 K CIRC PSI= 3376 PSI MW IN=8.78 PPG MW OUT=8.67 PPG ECD =9.65 PPH IAP=468 PSI OAP=84 PSI PVT=306 BBLS 17:40 - 21:00 3.33 DRILL N DPRB 10,130.0 PROD1 DRILLED 150'PU TO CHECK PARAMETERS PARAMETERS LOOK GOOD,CONTINUE DRILLING FREE SPIN=3100 PSI AT 1.84 BPM RATE IN=1.77 BPM RATE OUT=1.77 BPM ROP=82 FPH WOB=2.54 K CIRC PSI= 3376 PSI MW IN=8.78 PPG MW OUT=8.67 PPG ECD =9.64 PPH IAP=505 PSI OAP=85 PSI PVT=306 BBLS 21:00 - 23:30 2.50 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE SECTION F/ 10350'MD TO 10550'MD. DHWOB:0.5-2.5K-LBS PUMP RATE:1.71 BPM, MM OUT:1.71 BPM CIRC PSI:3157 PSI,FREE SPIN:2950 PSI MUD WEIGHT IN/OUT:8.80/8.67 PPG. PVT/IA/OA:298 BBL/647 PSI/90 PSI ECD:9.65 PPG AVERAGE ROP:80 FPH • 23:30 - 00:00 0.50 DRILL P PROD1 WIPER TRIP TO WINDOW. PULLING 30 FPM,CIRC RATE:1.76 BPM CIRC PSI:2999 PSI,MW IN/OUT:8.80/8.70 PPG PVT:293BBL,IA:679 PSI,OA:94 PSI 7/30/2013 00:00 - 00:15 0.25 DRILL P PROD1 LOG RA TAG(+2 FT CORRECTION). Printed 8/19/2013 10:23:14AM S North America-ALASKA-BP Page 19 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:15 - 01:15 1.00 DRILL P PROD1 WIPER TRIP F/WINDOW TO BOTTOM AT 10550'MD. RIH©30 FPM. PUMPING:1.76 BPM W/3000 PSI. 01:15 - 05:15 4.00 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE F/10550'MD TO 10850'MD. 'DHWOB:0.5-2.5K-LBS PUMP RATE:1.73 BPM, MM OUT:1.68 BPM CIRC PSI:3223 PSI,FREE SPIN:2975 PSI MUD WEIGHT IN/OUT:8.82/8.67 PPG. PVT/IA/OA:285 BBL/703 PSI/96 PSI ECD:9.65 PPG AVERAGE ROP:67 FPH PERFORM 100'WIPER TRIP F/10700'MD. 05:15 - 06:15 1.00 DRILL P PROD1 PERFORM 200'WIPER TRIP F/10813'. POH 25 FPM,PUMPING:1.79 BPM W/3120 PSI. 06:15 - 06:30 0.25 DRILL P PROD1 DRILLED ANOTHER 150'FROM LAST BHA WIPER,PU AND CHECK PARAMETERS,IF EVERYTHING LOOKS OK OBTAIN SPR'S BEFORE CONTINUING TO DRILL 06:30 - 06:40 0.17 DRILL P PROD1 OBTAIN SPR'S 06:40 - 07:20 0.67 DRILL P PROD1 CONTINUE DRILLING FREE SPIN=3100 PSI AT 1.80 BPM RATE IN=1.89 BPM RATE OUT=1.86 BPM ROP=75 FPH WOB=1.65 K CIRC PSI= 3545 PSI MW IN=8.85 PPG MW OUT=8.70 PPG ECD =9.84 PPH IAP=775 PSI OAP=101 PSI PVT=275 BBLS 07:20 - 15:00 7.67 DRILL P PROD1 CONTINUE DRILLING WITH BHA WIPER TRIPS FREE SPIN=3100 PSI AT 1.80 BPM RATE IN=1.89 BPM RATE OUT=1.86 BPM ROP=85 FPH WOB=2.65 K CIRC PSI= 3567 PSI MW IN=8.87 PPG MW OUT=8.74 PPG ECD =10.0 PPH IAP=870 PSI OAP=100 PSI PVT=274 BBLS DIFFICULT TO TRANSFER WEIGHT FOR DRILLING AHEAD. DISCUSS DOG LEG SEVERITY WITH TOWN ENGINEER,RUN CADE. CADE RESULTS INDICATE DIFFICULTY IN REACHING TD WITH AGITATOR WITH CURRENT DOG LEG SEVERITY. 15:00 - 16:15 1.25 DRILL P PROD1 CONDUCT WIPER TRIP AND RUN BACK TO BOTTOM WITH NO ISSUES. DISPLACE TO NEW MUD SYSTEM WHILE DRILLING AHEAD TO 11,190'. FREE SPIN=3290 PSI AT 1.85 BPM RATE IN=1.85 BPM RATE OUT=1.80 BPM ROP=80-85 FPH WOB=1.2-2.25 K CIRC PSI=3500-3560 PSI MW IN=8.87 PPG MW OUT=8.74 PPG ECD =10.0 PPH IAP=875 PSI OAP=110 PSI CIRCULATING PRESSURES DROPPING AS NEW MUD IS CIRCULATING AROUND. PICK UP OFF BOTTOM CLEAN. Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 20 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud DateTme:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA iUWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:15 - 20:00 3.75 DRILL P PROD1 POH WITH LATERAL BHA FOR BHA CHANGE. FLOWCHECK WELL AT 250'. GET OFF WELL. STAND BACK INJECTOR. 20:00 - 21:30 1.50 DRILL P PROD1 PJSM. BREAK AND UD BHA#11. M/U BHA#12 INCLUDING NEW 2-3/8"ULTRA X/LS MUD MOTOR W/1.0°AKO,AGITATOR AND REBUILT HCC SLICK 2.7"X 3"BIT. STAB COIL. GET ON WELL.TEST QTS 250/3500 PSI. 21:30 - 00:00 2.50 DRILL P PROD1 RIH W/BHA#12 AT 100 FPM PUMPING 0.21 BPM W/950 PSI. 7/31/2013 00:00 - 01:30 1.50 DRILL P PROD1 LOG RA TAG(-6'CORRECTION). CLOSE EDC. CONTINUE TO RIH AT 30FPM PUMPING 1.72 BPM W/3065 PSI. 01:30 - 03:30 2.00 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE F/11190'MD TO 11350'MD. DHWOB:1.5K-LBS PUMP RATE:1.73 BPM, MM OUT:1.65 BPM CIRC PSI:3457 PSI,FREE SPIN:3215 PSI MUD WEIGHT IN/OUT:8.65/8.70 PPG. PVT/IA/OA:305 BBL/586 PSI/92 PSI ECD:9.85 PPG .AVERAGE ROP:80 FPH 03:30 - 04:30 1.00 DRILL P PROD1 PERFORM 500'WIPER TRIP F/11350'TO 10850'30 FPM PUMPING 1.76 BPM W/3400 TO 3600 PSI. 04:30 - 06:45 2.25 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE F/11350'MD TO 11500'MD. DHWOB:1.1K-LBS PUMP RATE:1.73 BPM, MM OUT:1.65 BPM CIRC PSI:3457 PSI,FREE SPIN:3240 PSI MUD WEIGHT IN/OUT:8.65/8.70 PPG. PVT/IA/OA:305 BBL/586 PSI/92 PSI ECD:9.85 PPG AVERAGE ROP:67 FPH 06:45 - 07:30 0.75 DRILL P PROD1 CONDUCT WIPER TRIP AFTER DRILLING 150'. TRIP WENT WELL. OBTAIN SLOW PUMP RATES. 07:30 - 11:30 4.00 DRILL P PROD1 DRILL AHEAD FROM 11,500'. FREE SPIN 3490 PSI AT 1.75 BPM. -3625-3850 PSI AT 1.75 BPM,ECD 9.9 PPG, WOB.4K AVERAGE,ROP 60-80 FPH -MW IN 8.65 PPG,MW OUT 8.70 PPG,IA 815 PSI,OA 105 PSI 11:30 - 13:45 2.25 DRILL P PROD1 LONG VIPER TRIP UP TO WINDOW. TRIP WENT WELL,NO ISSUES PAST BILLET. PULL INTO WINDOW,LOG TIE-IN WITH+2.5' CORRECTION. RUN BACK DOWN. AVERAGE 3 BPH LOSS RATE. PVT AT END OF WIPER 286 BBLS. 1345 - 17:30 3.75 DRILL P PROD1 DRILL AHEAD FROM 11,650'. FREE SPIN 2880 PSI AT 1.55 BPM. -3360-3970 PSI AT 1.55-1.75 BPM,ECD 9.9-9.98 PPG,WOB.4-1.1K AVERAGE,ROP 20-65 FPH -MW IN 8.65 PPG,MW OUT 8.70 PPG,IA 815 PSI,OA 105 PSI 17:30 - 18:00 0.50 DRILL P PROD1 BHA VIPER TRIP WITH NO ISSUES Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 21of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 20:00 2.00 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE F/11800'MD TO 11900'MD. DHWOB:0.84K-LBS PUMP RATE:1.78 BPM, MM OUT:1.74 BPM CIRC PSI:3925 PSI,FREE SPIN:3600 PSI MUD WEIGHT IN/OUT:8.69/8.72 PPG. PVT/IA/OA:264 BBL/586 PSI/92 PSI ECD:9.98 PPG AVERAGE ROP:50 FPH 20:00 - 21:30 1.50 DRILL P PROD1 WIPER TRIP F/11900'TO 10750'AT 30 FPM PUMPING 1.65 TO 1.85 BPM W/3900- 4100 PSI. PULLED SLICK. WORKED THROUGH TIGHT HOLE F/11700'TO 11750'GOING DOWN. 21:30 - 00:00 2.50 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE F/11900'MD TO 11991'M D. DHWOB:0.75-1.0K-LBS PUMP RATE:1.63 BPM, MM OUT:1.55 BPM CIRC PSI:3534 PSI,FREE SPIN:3300 PSI MUD WEIGHT IN/OUT:8.67/8.73 PPG. PVT/IA/OA:245 BBL/908 PSI/114 PSI ECD:9.98 PPG AVERAGE ROP:36.4 FPH 8/1/2013 00.00 - 02.00 2.00 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE F/11991'MD TO 12040'M D. DHWOB:0.5-0.75K-LBS PUMP RATE:1.57 BPM, MM OUT:1.52 BPM CIRC PSI:3523 PSI,FREE SPIN:3375 PSI MUD WEIGHT IN/OUT:8.69/8.73 PPG. PVT/IA/OA:230 BBL/916 PSI/112 PSI ECD:9.98 PPG AVERAGE ROP:34 FPH 02.00 - 02:30 0.50 DRILL P PROD1 WIPER TRIP F/12040'TO 11650'. PUMPING 1.68 BPM W/3885 PSI.PULLED SLICK W/28 K-LBS PU WT. AVERAGE SO WEIGHT WHILE RIH 9-10 K-LBS. SET DOWN AT 11720',11740', 11997',AND 12015'MD.GR UP TO 150 API F/ 11700'TO 11750'. GR AT 12000'STEADY BETWEEN 40-50 API. 02:30 - 04:00 1.50 DRILL P PROD1 DIRECTIONAL DRILL 3"HOLE F/12040'MD TO 12088'MD. DHWOB:0.5-0.75K-LBS PUMP RATE:1.54 BPM, MM OUT:1.47 BPM CIRC PSI:3360 PSI,FREE SPIN:3250 PSI MUD WEIGHT IN/OUT:8.69/8.70 PPG. PVT/IA/OA:266 BBL/520 PSI/112 PSI ECD:10.10 PPG AVERAGE ROP:32 FPH LOCKED UP COIL AT 12088'MD. P/U TO BHA WIPER,COULD NOT GET BACK DOWN TO BOTTOM. DECIDED TO DO FULL WIPER TRIP TO WINDOW. BOTTOMS UP SAMPLE FROM 12,088'REVEALED MHO/TAR FORMATION. Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 22 of 22 Operation Summary Report Common Well Name:F-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/20/2013 End Date:8/1/2013 1X3-013W3-C:DRILL(3,149,620.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 09:15 5.25 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 12,088'MD AT 15 FPH PUMPING 1.72 BPM W/3845 PSI. PULL INTO WINDOW,LOG TIE-IN WITH+2.5' CORRECTION. -OPEN EDC,JET ACROSS WHIPSTOCK TRAY. PULL UP HOLE PUMPING AT 2.25 BPM,3540 PSI. PUMP HI-VIS SWEEP TO COINCIDE WITH 9-51'CASING TRANSITION. -PULL UP TO 8300',LOG CCL ACROSS LINER TOP SETTING AREA ON TRIP BACK DOWN. CONTINUE ON DOWN TO WINDOW. CLOSE EDC,RUN THROUGH WINDOWAND GAUGE HOLE CONDITIONS ON TRIP DOWN. TRIP DOWN WENT WELL WITH NO SIGNIFICANT ISSUES. -PUMP HI-VIS SWEEP TO COINCIDE WITH TAGGING CURRENT TD. PUMP AROUND AND I CHASE OUT OF HOLE WHILE CONDUCTING _ WIPER TRIP BACK TO WINDOW. 09:15 - 12:30 3.25 DRILL P PROD1 CONDUCT WIPER TRIP FROM UNCORRECTED TD OF 12,088'TO WINDOW WHILE CHASING HI-VIS PILL UP HOLE. HOLE SEEMS IN GOOD CONDITION. NO SIGNIFICANT INCREASE IN CUTTINGS WITH RETURN OF SWEEP. LOG TIE-IN WITH+2' CORRECTION. RUN BACK DOWN TO TD. CONDUCT H2S RIG ABANDONMENT DRILL. SIMULATE SECURING WELL,ALL PERSONNEL ON LOCATION MUSTERED AT PRIMARY MUSTER AREA. ONE MAN DIRECTED TO STAY ON RIG AS MAN DOWN. CONDUCT AAR REGARDING WHY RIG EVACUATION IS DONE WITH H2S,WHO CAN GIVE ALL CLEAR,WHO IS TASKED WITH GOING BACK ON TO RIG FOR VERIFICATION. 12:30 - 17:00 4.50 I DRILL P PROD1 TAG ON BOTTOM AT CORRECTED DEPTH OF 12,088'. PICKUP,FLOW CHECK OFF BOTTOM. POH LAYING IN LINER PILL WITH ALPINE BEADS. OPEN EDC AT WINDOW,JET TRAY,AND CONTINUE UP HOLE. PUMP HI-VIS SWEEP AT 9-5/8"TRANSITION. PULL TO SURFACE AND FLOW CHECK. POP OFF, STAND INJECTOR TO SIDE. 17:00 - 18:00 1.00 DRILL P PROD1 PJSM. LAY DOWN BHA.CUT OFF SCHLUMBERGER CTC. CLEAN AND CLEAR RIG FLOOR. Printed 8/19/2013 10:23:14AM North America-ALASKA-BP Page 1 of 7 Operation Summary Report Common Well Name:F-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/1/2013 End Date:8/6/2013 X3-013W3-C:DRILL(1,468,107.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs , Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/1/2013 18:00 - 19:00 1.00 CASING P RUNPRD PJSM ON PULLING BAKER TOOLS TO RIG FLOOR. MOBILIZE TOOLS TO RIG FLOOR. MAKE UP NOZZLE ASSEMBLY TO PUMP SLACK AND STAB ON WITH INJECTOR. PT QUICK TEST SUB. 19:00 - 21:30 2.50 CASING P RUNPRD PUMP SLACK FORWARD. GET OFF WELL. RECOVER 142'OF E-LINE. R/U AND CUT 100' OF COIL. INSTALL BTT CTC. PULL TEST CTC TO 38 K-LBS. P/T CTC TO 250/3500 PSI. M/U NOZZLE W/BALL CATCHER. SHUT IN MASTER,SWAB AND INNER REEL VALVES. 21:30 - 23:00 1.50 CASING P RUNPRD -GET ON WELL. PRESSURE TEST INJECTOR LUBRICATOR TO 250/3500 PSI. 23:00 - 00:00 1.00 CASING P RUNPRD OPEN WELL TO CLOSED CHOKE W/0 PSI WI-IP. OPEN CHOKE AND FLOWCHECK WELL-STATIC. LOAD AND PUMP 3/4"BALL AROUND COIL. GET OFF WELL. BREAK OFF NOZZLE.RECOVER BALL. SET INJECTOR ON LEGS. 8/2/2013 00:00 - 00:45 0.75 CASING P RUNPRD RIG UP FLOOR TO RUN LINER. PICKUP POWER TONGS. INSTALL ELEVATORS. CHECK SLIPS AND EQUIPMENT. 00:45 - 06:00 5.25 CASING P RUNPRD HOLD PJSM. M/U AND RIH W/2-3/8"TH 511 LINER AS PER PROGRAM INCLUDING;2-3/8" STL INDEXING GUIDE SHOE,BTT FLOAT COLLAR,1 X JT 2-3/8"ST-L,BTT FLOAT COLLAR,2-3/8"ST-L PUP JT,BTT LANDING COLLAR,2-3/8"TH 511 BOX X 2-3/8"ST-L PIN XO,112 X JTS 2-3/8"TH 511 LINER,2-3/8"TH 511 PUP JT,DEPLOYMENT GUIDE W/3"GS PROFILE,AND 3.8"SCOOP GUIDE. -HELD KICK WHILE TRIPPING DRILL WITH 40 JTS IN THE HOLE. WELL SECURE IN 2 MIN 15 SEC. CONTINUE WITH MAKING UP LINER PROGRAM. 06:00 - 06:30 0.50 CASING P RUNPRD LINER PROGRAM COMPLETED. STAB ON, PRESSURE TEST QUICK TEST SUB. 06:30 - 09:15 2.75 CASING P RUNPRD RIH WITH 2-3/8"LINER PROGRAM. RUN WENT WELL DOWN TO 11,750'. -SENT UPDATE TO AOGCC REGARDING TIMING FOR BOP TEST AT 0715 HRS 09:15 - 13:00 3.75 CASING P RUNPRD WORK THROUGH KNOWN SHALE STRINGER AT THIS POINT UTILIZING MINERAL OIL PILL PER WELLPLAN. PUMP 20 BBLS DOWN COIL. PLACE 5 BBLS OUT OF LINER WITH IMMEDIATE MOVEMENT 20'OF STRING ONCE IT EXITED. MOVE DOWN WITH COIL AND SET 4K DOWN AND ALLOW TO SOAK,AGAIN GAINING DOWNWARD MOVEMENT. MADE SEVERAL ATTEMPTS WITH THIS PROCESS I AND TAGGED BOTTOM AT 12,080'. Printed 8/19/2013 10:24:08AM North America-ALASKA-BP Page 2 of 7 Operation Summary Report Common Well Name:F-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/1/2013 End Date:8/6/2013 X3-013W3-C:DRILL(1,468,107.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 14:45 1.75 CASING P RUNPRD CLEAN PICK UP OFF BOTTOM,36K BREAKOVER. RUN BACK DOWN AND SET DOWN AGAIN AT 12,080'. POSITION REEL FOR BALL DROP. LOAD 5/8"BALL,PUMP DOWN. CLEAR INDICATION BALL OVER HORSE HEAD AND GOOSENECK. SET STRING IN COMPRESSION. PUMP BALL DOWN AT.35 BPM,2015 PSI. PRESSURE AT FINAL RATE OF.60 BPM,2650 PSI,44 BBLS AWAY.BRING ON PUMPS,PRESSURE UP AND SEE SHEAR AT 3820 PSI. PICK UP TO RELEASE FROM LINER RUNNING TOOL,SET BACK DOWN IN COMPRESSION. BEGIN DISPLACEMENT TO KCL. 14:45 - 17:30 2.75 CASING P RUNPRD DISPLACE TO KCL WHILE CEMENTERS ARE GETTING STAGED AND RIGGING UP. DISPLACE BY STAGING UP TO 2 BPM. -.65 BPM,2620 PSI -1.8 BPM,3450 PSI -2.0 BPM,3760 PSI -FINAL DISPLACEMENT AT 2.0 BPM,3240 PSI, MW IN 8.68 PPG,8.60 PPG -CEMENTERS RIGGED UP,PJSM ON CEMENT JOB. FLUID PACK LINES,PRESSURE TEST LINES WHILE DISPLACING Printed 8/19/2013 10:24:08AM North America-ALASKA-BP Page 3 of 7 Operation Summary Report Common Well Name:F-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/1/2013 End Date:8/6/2013 X3-013W3-C:DRILL(1,468,107.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (ft) 17:30 - 21:30 4.00 i CEMT P RUNPRD PT LINES TO 6200 PSI.BEGIN TO PUMP CEMENT. CEMENT 2 3/8"PRODUCTION LINER -BYPASS REEL FILTERS. 1-ESTABLISH CIRCULATION RATE OF 1.38 BPM,1975 PSI.PRIME CEMENT UNIT. BATCH 17 BBLS 15.8 PPG,YIELD 1.17 CU FT/SACK,LINER SLURRY AT 18:15 HRS. PUMP 5 BBLS KCL,PT LINES TO 6000 PSI. -PUMP 10.5 BBLS CEMENT AT 1.2 BPM,2850 PSI -CLEANUP CEMENT LINE WITH BIOZAN FROM RIG -LINE UP RIG PUMP AND PUMP 46.2 BBLS 2#/BBL BIOZAN,1.60 BPM,3180 PSI. -SLOW DOWN PUMP TO 1.0 BPM AT 35.0 BBLS,CEMENT AT TOOL. -P/U 11',BREAKOVER Wf 26000 AT 12069' PER BAKER HAND. CONTINUE TO PU ADDITIONAL 13'. -EXHAUST 2 BBLS CEMENT FROM COIL, PUMP 5 BBLS,1.5 BPM. -OPEN BAKER CHOKE,STACK 10 K INTO LINER DEPLOYMENT SLEEVE. -CLOSE BAKER CHOKE.PRESSURE UP TO SHEAR WIPER PLUG.2800PSI AT.4BPM, -PUMP 14.5 BBLS 0.60 BPM,3950 PSI TO BUMP WIPER PLUG.PRESSURE UP TO 4350 PSI. SLOWLY-BLEED OFF,OPEN BAKER CHOKE, CHECK FLOATS.FLOATS HOLDING. PRESSURE UP 500 PSI,UNSTING.CIP @ 19:45 HRS,CALCULATED TOC 9750'. -R/D CEMENTERS. -ESTIMATED TOC 9567'WITH GAUGE HOLE AND 8.2 BBL RETURNS AFTER CEMENT EXITED SHOE. PUMP POWERVIS EXHAUST PILL WHILE SLOWLY POH TO SURFACE. 21:30 - 22:30 1.00 CEMT P RUNPRD PJSM.GET OFF WELL. STAND BACK INJECTOR. POH AND LAY DOWN LINER RUNNING STRING. 22:30 - 00:00 1.50 BOPSUR P OTHCMP CLOSE MASTER AND SWAB VALVE. LEAK TIGHT TEST SAME. OPEN SWAB VALVE. CLOSE SSV. P/T SSV.TO CONFIRM TWO MECHANICAL BARRIERS PRIOR TO OPENING BOPS. OPEN AND INSPECT BOPS. PULL KILL LINE CHECK VALVE. 8/3/2013 00:00 - 02:00 2.00 BOPSUR P OTHCMP CONTINUE TO INSPECT BOP RAMS. CHANGE BLADE SEAL ON BLIND RAMS. CHANGE OUT VBRS FOR 1"CSH RAMS. CLOSE RAM BODIES.LUBRICATE CHOKE AND MUD CROSS VALVES. FLUID PACK BOP STACK AND CHOKE AND KILL LINES. INSTALL TEST PLUG. BACK OUT AND L/D RUNNING TOOL. Printed 8/19/2013 10:24:08AM North America ALASKA-BP Page 4 of 7 Operation Summary Report Common Wet Name:F-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/1/2013 End Date:8/6/2013 X3-013W3-C:DRILL(1,468,107.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UW: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 12:00 10.00 BOPSUR P OTHCMP SHELL TEST STACK. BEGIN BOPE TESTAS PER NORDIC 1 TEST PROCEDURE. SHELL TEST TO 250/4500 PSI. ALL OTHER TESTS TO 250/3500 PSI. -STATE AOGCC REPRESENTATIVE BOB NOBLE ON LOCATION TO WITNESS TEST -FUNCTION TEST REMOTES FROM DRILLER CONSOLE AND CTD OPERATOR CONSOLE 12:00 - 13:30 1.50 BOPSUR P OTHCMP PJSM ON TESTING INNER REEL VALVE AND PACKOFFS. STAB ON WITH INJECTOR,MAKE UP QUICK TEST SUB AND PRESSURE TEST. -TEST INNER REEL VALVE AND PACKOFFS TO 250 PSI LOW,3500 PSI HIGH 1-POP OFF WITH INJECTOR,STAND BACK 13:30 - 14:30 1.00 BOPSUR P OTHCMP SUCK STACK DRY. PULL BOP TEST PLUG. CLEAR AND CLEAN RIG FLOOR. 14:30 - 15:45 1.25 EVAL P OTHCMP PJSM ON OPENING UP TO WELL. INSTALL NIGHTCAP,PRESSURE TEST TO 250 PSI LOW,3500 PSI HIGH AGAINST CLOSED TREE VALVES AND SSV. GOOD TEST. OPEN UP TO WELL. FILL WELL WITH 2.5 BBLS. SHUT DOWN PUMPS,MONITOR WELL BEFORE PULLING CAP. GOOD NO FLOW CHECK. 15:45 - 16:15 0.50 EVAL P OTHCMP PJSM FOR MAKING UP CLEANOUT BHA. DISCUSS STANDING ORDERS FOR KICK RESPONSE WHILE MAKING UP WORK STRING. INSPECT SAFETY JOINT MAKE-UP, DRIFT CLEANOUT JEWELRY. 16:15 - 18:00 1.75 EVAL P OTHCMP MAKE UP 1.75"CLEANOUT BHA. CONDUCT KICK WHILE MAKING UP BHA DRILL WITH NEW DRILLER AND NEW FLOORHAND. CREW REACTED ACCORDING TO STANDING ORDERS. GOOD RESPONSE. GIVE ALL CLEAR,CONDUCT AAR. 18:00 - 18:30 0.50 EVAL P OTHCMP CREW CHANGE. HOLD PJSM FOR MAKING UP CLEANOUT BHA WITH NEW CREW. DISCUSS STANDING ORDERS FOR KICK RESPONSE WHILE MAKING UP WORK STRING. 18:30 - 22:30 4.00 EVAL P OTHCMP CONTINUE TO RIH W/1.75"CLEANOUT BHA PICKING UP 1"CSH. CONDUCT KICK WHILE TRIPPING DRILL CREW REACTED ACCORDING TO STANDING ORDERS. GOOD RESPONSE. GIVE ALL CLEAR,CONDUCT AAR. CONTINUE TO PICK UP AND RIH W/ 1.75"CLEANOUT BHA. STAB COIL.GET ON WELL.TEST QTS TO 250/3500 PSI. 22:30 - 00:00 1.50 EVAL P OTHCMP RIH W/1.75"CLEANOUT BHA ON COIL F/3745' TO 8559'AT 30 FPM,PUMPING 0.95 BPM W/ 2295 PSI. 8/4/2013 00:00 - 02:15 2.25 EVAL P OTHCMP CONTINUE TO RIH W/CLEANOUT BHA F/8559' TO PBTD AT 12053'UNCORRECTED AT 34 FPM,PUMPING 0.97 BPM,WITH 2021 PSI. 02:15 - 05:00 2.75 EVAL P OTHCMP CIRCULATE OUT OF THE HOLE FROM PBTD, DISPLACING EXHAUST PILL WITH KCL AT 50 FPM,PUMPING 0.94 BPM WITH 1729 PSI. POH TO 3745'.FLOWCHECK. GET OFF WELL. STAND INJECTOR BACK. 05:00 - 06:00 1.00 EVAL P OTHCMP POH W/CLEANOUT BHA TO SURFACE.RACK BACK 1"CS HYDRIL.CREW CHANGE OUT. Printed 8/19/2013 10:24:08AM North America-ALASKA-BP Page 5 of 7 Operation Summary Report Common Well Name:F-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/1/2013 End Date:8/6/2013 X3-013W3-C:DRILL(1,468,107.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 08:45 2.75 EVAL P 1 OTHCMP CONTINUE WITH STANDING BACK 1"CSH •WORK STRING. CONDUCT KICK DRILL WITH ROUSTABOUT ON FLOOR FOR TRAINING. GOOD CREW RESPONSE FOLLOWING 1 STANDING ORDERS AND PICKING UP SAFETY JOINT. CONDUCT AAR,NO COMMENTS FOR , ANY CHANGES. CONTINUE PULLING WORK STRING. 08:45 - 09:15 0.50 EVAL P OTHCMP 1 CLEAR AND CLEAN RIG FLOOR. MONITOR I WELL,STATIC. PREPARE FOR LOGGING RUN. MOBILIZE TOOLS TO RIG FLOOR. 09:15 - 09:30 0.25 EVAL 1 P OTHCMP PJSM FOR MAKING UP LOGGING BHA. DISCUSS RESTRICTED AREAS WHILE MAKING UP SOURCE TOOL AND REACTION 1 FOR ANY KICK RESPONSE WHILE HANDLING 1 BHA. 109:30 - 13:15 3.75 EVAL P OTHCMP MU MCNL LOGGING BHA:LOGGING TOOL, , • XO,CIRC SUB,HYDRAULIC DISCONNECT,XO, 10 JTS CSH WORK STRING,MARKER JOINT, 108 JTS CSH WORK STRING,XO,HYDRAULIC DISCONNECT,DUAL BACK PRESSURE VALVE, • ,XO,2 JTS PH6,XO,QUICK CONNECT,COIL TUBING CONNECTOR 13:15 - 14:45 1.50 EVAL P OTHCMP STAB ON WITH INJECTOR,PRESSURE TEST QUICK TEST SUB. RIH WITH LOGGING BHA. MAKE CORRELATION CHECK WITH LOGGERS ' AT 5300'. CONTINUE RUNNING DOWN WITH LOGGING BHA. 14:45 - 18:00 3.25 EVAL P OTHCMP BEGIN LOGGING DOWN AT 30 FPM TO UNCORRECTED PBTD OF 12,053'. TIME PERF PILL TO EXIT STRING AT PBTD. CONFIRM COIL TUBING DEPTH WITH LOGGER'S DEPTH. , WAIT FOR PERF PILL TO EXIT AND GET ABOVE BHA,BEGIN TO PULL UP HOLE. PULL 1 UP TO 11,861'AND PAINT FLAG. CONTINUE TO PULL UP HOLE LAYING IN PERF PILL 18:00 - 19:30 1.50 EVAL P OTHCMP POH WITH LOGGING ASSEMBLY. FLOWCHECK. GET OFF WELL. STAND BACK COIL. 19:30 - 21:15 1.75 EVAL P OTHCMP PJSM. POH W/LOGGING BHA RACKING ' BACK 1"CS HYDRIL IN DERRICK F/3761'TO 335'MD. 21:15 - 21:45 0.50 EVAL P OTHCMP PJSM W/RIG CREW AND SLB LOGGERS. BREAK AND LAY DOWN MEMORY LOGGING BHA. 21:45 - 23:00 1.25 EVAL 1 P OTHCMP PJSM. LOAD PERF GUNS INTO THE PIPE , SHED. RIG UP SCHLUMBERGER TCP T EQUIPMENT FOR RUNNING PERF GUNS. 23:00 - 00:00 1.00 EVAL P OTHCMP WAIT FOR TOWN GEOLOGISTS TO I INTERPRET LOGS AND FINALIZE PERF DEPTHS. PBTD CORRECTED TO 12043.52' MD. HOLD PJSM FOR PICKING UP PERF GUNS. 8/5/2013 00:00 - 04:00 4.00 PERFOB P OTHCMP M/U PERF BHA INCLUDING 63 PERF GUNS AND 38 STANDS OF 1"CSH PIPE.TO 3796' I I MD. STAB COIL.GET ON WELL.TEST QTS. Printed 8/19/2013 10:24:08AM North America-ALASKA-BP Page 6 of 7 Operation Summary Report Common Well Name:F-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/1/2013 End Date:8/6/2013 X3-013W3-C:DRILL(1,468,107.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 06:30 2.50 PERFOB P OTHCMP RIH W/PERF BHA F/3796'TO TD FLAG. CORRECT TO FLAG DEPTH,CONTINUE TO RIH TO PBTD. TAG TWICE TO CONFIRM PBTD. PICK UP TO BREAKOVER AND CORRECT TO LOGGING CORRECTED PBTD OF 12,043.5. 06:30 - 06:50 0.33 PERFOB P OTHCMP PICK UP TO 2'BELOW FIRING DEPTH. PJSM 'ON PERFORATING. DISCUSS PUMP CYCLES, CHOKE ALIGNMENT,HOLDING BACK PRESSURE AFTER FIRING. BEGIN FIRING SEQUENCE,SLOWLY MOVE COIL UP TO FIRING DEPTH AND FIRE PERF GUNS ON DEPTH AT 12,030'. -930'OF PERFORATION GUNS(1.56"6 SPF 1606PJ GUNS)FIRED OVER PERF INTERVAL FROM 10,700'-12,030' 06:50 - 10:15 3.42 PERFOB P OTHCMP POH WITH PERF ASSEMBLY HOLDING 200-250 PSI BACKPRESSURE AND MAINTAINING POSITIVE RETURNS. FLOW CHECK AT TOP OF LINER,ALL GOOD. CONTINUE TO POH WITH ASSEMBLY MAINTAINING POSITIVE RETURNS. PJSM ON LAYING DOWN BHA. FLOW CHECK AT SURFACE GOOD. POP OFF AND STAND BACK INJECTOR. PREPARE TO LAY DOWN BHA. 10:15 - 13:15 3.00 PERFOB P OTHCMP LD UPPER PORTION OF BHA. FLUSH WORK STRING WITH FRESH WATER. STAND BACK 1"CSH WORK STRING IN DERRICK. 13:15 - 17:00 3.75 PERFOB P OTHCMP PJSM FOR LAYING DOWN PERF GUNS. DISCUSS SHARP EDGES ON GUNS, POSSIBILITY OF TRAPPED GAS,USE OF SAFETY JOINT DURING LAYING DOWN OF BHA. LAY DOWN PERF GUNS IN PIPE SHED. ALL SHOTS FIRED. 17:00 - 17:30 0.50 PERFOB P OTHCMP CLEAR AND CLEAN RIG FLOOR. OFFLOAD PERF GUNS FROM RIG. 17:30 - 18:00 0.50 WHSUR P POST MU NOZZLE ASSEMBLY WITH CHECK VALVES FOR FREEZE PROTECTING WELL. STAB ON WITH INJECTOR,PRESSURE TEST QUICK TEST SUB. 18:00 - 19:00 1.00 WHSUR P POST RIH WITH FREEZE PROTECT BHATO2500' MD. 19:00 - 20:00 1.00 WHSUR P POST FREEZE PROTECT WELL FROM 2500'W/42 BBL OF DIESEL WHILE POH TO SURFACE. FLOWCHECKAT SURFACE. 20:00 - 20:30 0.50 WHSUR P POST PJSM.POP OFF INJECTOR.L/D FREEZE PROTECT BHA. 20:30 - 21:30 1.00 WHSUR P POST PJSM W/GREASE CREW. GREASE TREE VALVES. LOAD LUBRICATOR INTO PIPE SHED. 21:30 - 23:00 1.50 WHSUR P POST PJSM. CLOSE MASTER AND SWAB VALVES. PICK UP LUBRICATOR.M/U CAMERON TYPE "J"BPV TOOL STRING. INSTALL LUBRICATOR AND PRESSURE TEST SAME AS PER CRT-AK-10-45. 23:00 - 23:30 0.50 WHSUR P POST SET CAMERON TYPE"J"BPV IN TUBING HANGER AS PER RP AND CH2 PROCEDURE. R/D CH2 LUBRICATOR AND LOAD OUT OF PIPE SHED. 23:30 - 00:00 0.50 WHSUR P POST STAB INJECTOR.PJSM FOR N2 REEL BOLWDOWN. Printed 8/19/2013 10:24:08AM NorthAmerica ALASKA-BP Page 7 of 7 Operation Summary Report Common Well Name:F-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/1/2013 End Date:8/6/2013 X3-013W3-C:DRILL(1,468,107.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:12/8/1979 12:00:00AM Rig Release:8/6/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @66.3ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/6/2013 00:00 - 01:30 1.50 WHSUR P POST PJSM FOR N2 REEL BLOWDOWN. PRESSURE TEST LINES TO 250/4000 PSI. SET AND TEST N2 PUMP TRIPS TO 3500 PSI. WSL WITNESSED PRESSURE TEST AND PUMP TRIP TEST. MICRO MOTION METERS WERE BYPASSED. PUMPED 30 BBL OF WATER AND 5 BBL OF MEOH THROUGH REEL. OPEN LINE TO N2 AND BLOW REEL DOWN WITH N2. USED SUPERCHOKE TO REGULATE PRESSURE TO THE TIGER TANK REEL PRESSURE WAS-2500 PSI. 01:30 - 04 45 3.25 WHSUR P POST PJSM WITH CREWAND CH2MHILL CREW. POP OFF INJECTOR. CUT COIL CONNECTOR OFF. INSTALL AND PULL TEST GRAPPLE ON COIL. PULL COIL TO REEL HOUSE. SECURE COIL TO REEL. RIG DOWN HARD LINE. RIG DOWN REEL AND PREPARE TO LOWER TO TRUCK. 04:45 - 06:00 1.25 WHSUR P POST PJSM. LOWER REEL TO TRAILER. POSITION OTHER REEL IN PLACE. CONDUCT CREW CHANGE OUT • 06:00 - 07:00 1.00 WHSUR P POST PJSM WITH NEW CREW ON LOADING NEW REEL. BRING NEW REEL ONTO RIG AND SECURE IN REEL HOUSE. 07:00 - 08:30 1.50 RIGD P POST PREP TO PULL REEL ACROSS. PJSM ON PULLING ACROSS. PULL REEL ACROSS AND STAB INTO INJECTOR. -MOVING EQUIPMENT OFF LOCATION AND STAGING ON DS 11 08:30 - 12:00 3.50 RIGD P POST MAKE UP HARD IRON FOR INNER REEL VALVE. CHANGE OUT BRASS AND PACKOFFS ON INJECTOR. BEGIN INSPECTION ON BOP STACK:OPEN DOORS,INSPECT SEALS AND RAM ELEMENTS. CHANGE OUT LOWER RAMS TO 2-3/8"COMB!RAMS. -SENT BOP 24-HOUR TEST NOTIFICATION TO AOGCC VIA WEBSITE AT 0900 HRS ON 8/6/2013 FOR TENTATIVE TEST TIME OF NOON ON 8/7/2013. 12:00 - 14:00 2.00 BOPSUR P POST PJSM.PICK UP INJECTOR S/O WELL, REMOVE PACKOFF,INSPECT AND C/O UPPER BRASS,RE-INSTALL PACKOFF AND STAND BACK INJECTOR.CONTINUE WITH INSTALLING HARD IRON AND INNER REEL ASSEMBLY. 14:00 - 15:30 1.50 BOPSUR P POST PJSM.ND BOP'S,NU TREE CAP 15:30 - 16:30 1.00 BOPSUR P POST PT TREE CAP 250-3500 PSI-GOOD TESTS, FLUID PACK TREE WITH MEOH ****RIG RELEASED FROM F-10CAT 16:30 END CON EVENT*** Printed 8/19/2013 10:24:08AM F-10C, Well History (Post Rig Sidetrack) Date Summary 08/07/13 T/I/O=0/0/0 Conduct PJSM, barriers MV&SSV verified by bleeding tubing pressure off MV&SSV indepently, LTT pass, shut in SV bled off pressure, removed BOP test spool, installed 6"tree cap flange, Removed blind flange installed 6"tapped flange, stabbed on CIW lubricator w/6"J pulling tool, P/T lubricator to 300/3500 psi for 5 mins each passed, RIH tagged and pulled 6"CIW BPV#403 at 130", Stabbed on CIW lubricator w/6"J TWC#423, PR-lubricator to 300/3500 psi for 5 mins each, RIH set TWC at 130" bled off tubing pressure torqued tree to API specs, Performed and doc. shell test to 300/5000 psi for 5 mins Pass, RIH pulled TWC, RDMO. 08/10/13 DRIFT 1.75" CENT., S-BAILER TO DEV @ 10,053' SLM (no sample). DRIFT 3.5" CENT, 2-7/8" BRUSH TO DEP. SLEEVE©8,528' SLM. RAN 3.62" DPU DRIFT,4-1/2"GR, KB PACKER DRIFT, 3.5" LIB TO DEP. SLEEVE @ 8528' SLM(impression of rig trash). CURRENTLY RIH W/3.68"CENT, 3' 1-7/8" STEM, 3.70" LIB TO TAG DEP. SLEEVE. 08/11/13 RAN 3.70" LIB TO DEP. SLEEVE @ 8529' SLM(8541' md)(impression of dep. sleeve). BRUSH AND FLUSH DEP SLEEVE W/2-7/8" BRUSH, 10 BBLS DIESEL. RAN 3.5" LIB TO DEP SLEEVE @ 8,528' SLM (impression of dep sly, gouges on edge). SET BAKER 45 KB PACKER IN DEP. SLEEVE © 8,541' MD. SET LINER TOP TEST PLUG IN LINER TOP PACKER @ 8,520'SLM. PERFORMED PASSING MIT-T TO 2,000 PSI ON LINER TOP PACKER. PULLED STA.#3 RK-DGLV @ 5897' SLM(5908' MD). PULLED STA.#4 RK-DLGV @ 3278' SLM(3293' MD). SET STA.#4 RK-LGLV @ 3278'SLM(3293' MD). CURRENTLY RIH TO SET STA.#3 RK-OGLV. 08/11/13 T/I/0=0+/vac/140 Temp=Sl Assist Slickline (Post CTD) Pumped 10 bbls 50*f diesel down Tbg. Final WHPs 0/Vac/140. Slickline still on well at time of departure. 08/12/13 SET STA.#3 RK-OGLV(generic 5/16" ports) @ 5897' SLM(5908' MD). PULLED LTTP @ 8520'SLM. Page 1 of 1 El�u BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-10 - Slot 10 F-10CPB1 Survey: MWD Survey Report - Geographic 09 August, 2013 Qbp NMI BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10CPB1 Survey Calculation Method: Minimum Curvature Design: F-10CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29usft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70 usft Longitude: 148°46'31.47 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: 1.15° Well F-10 API No. 500292041000 l Well Position +N/-S 0.00 usft Northing: 5,974,482.00 usft Latitude: 70°20'14.307 N +El-W 0.00 usft Easting: 651,958.00 usft Longitude: 148°46'1.20 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 38.45 usft Wellbore F-10CPB1 API no. 500292041070 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (°) (nT) BGGM2012 7/25/2013 20.28 81.05 57,623 Design F-10CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,424.37 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (0) 30.80 0.00 0.00 121.68 Survey Program Date: 8/9/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1:Sperry-Sun BOSS gyro multi(F-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,360.00 9,424.37 MWD(F-10B) MWD MWD-Standard 9,452.50 10,350.00 MWD(F-10CPB1) MWD MWD-Standard 8/9/2013 9:15:59AM Page 2 COMPASS 5000.1 Build 61 I/.FAIN BAKER HES Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10CPB1 Survey Calculation Method: Minimum Curvature Design: F-10CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +El-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,424.37 31.90 115.55 8,577.57 -1,584.80 2,535.05 5,972,949.01 654,524.45 70°19'58.717 N 148°44'47.17 W TIP 9,452.50 32.14 107.95 8,601.43 -1,590.32 2,548.88 5,972,943.78 654,538.39 70°19'58.662 N 148°44'46.77 W KOP 9,474.83 28.96 110.28 8,620.66 -1,594.02 2,559.60 5,972,940.29 654,549.19 70°19'58.626 N 148°44'46.46 W 9,501.02 25.70 113.61 8,643.93 -1,598.49 2,570.76 5,972,936.04 654,560.43 70°19'58.582 N 148°44'46.13 W 9,530.83 22.11 118.53 8,671.18 -1,603.77 2,581.61 5,972,930.99 654,571.39 70°19'58.530 N 148°44'45.81 W 9,560.79 18.77 121.35 8,699.25 -1,608.97 2,590.69 5,972,925.98 654,580.56 70°19'58.479 N 148°44'45.55 W 9,595.09 21.36 120.57 8,731.46 -1,615.02 2,600.78 5,972,920.13 654,590.78 70°19'58.419 N 148°44'45.25 W 9,623.13 22.09 113.83 8,757.52 -1,619.74 2,610.00 5,972,915.59 654,600.09 70°19'58.373 N 148°44'44.98 W 9,650.96 25.10 111.27 8,783.02 -1,624.00 2,620.29 5,972,911.55 654,610.47 70°19'58.331 N 148°44'44.68 W 9,680.24 27.43 107.50 8,809.27 -1,628.28 2,632.51 5,972,907.51 654,622.77 70°19'58.289 N 148°44'44.33 W 9,707.91 29.60 106.81 8,833.59 -1,632.18 2,645.13 5,972,903.88 654,635.47 70°19'58.250 N 148°44'43.96 W' 9,741.45 32.72 104.91 8,862.28 -1,636.91 2,661.83 5,972,899.49 654,652.25 70°19'58.204 N 148°44'43.47 W'. 9,769.78 37.82 104.95 8,885.41 -1,641.12 2,677.63 5,972,895.60 654,668.13 70°19'58.162 N 148°44'43.01 W 9,799.98 43.00 109.68 8,908.40 -1,646.98 2,696.29 5,972,890.11 654,686.91 70'19'58.104 N 148°44'42.47 W 9,828.77 46.28 115.08 8,928.89 -1,654.70 2,714.97 5,972,882.77 654,705.74 70°19'58.028 N 148°44'41.92 W 9,859.78 50.25 121.26 8,949.54 -1,665.65 2,735.32 5,972,872.24 654,726.31 70°19'57.921 N 148°44'41.33 W 9,890.07 53.29 114.35 8,968.29 -1,676.71 2,756.36 5,972,861.61 654,747.57 70°19'57.812 N 148°44'40.71 W 9,915.10 55.78 109.35 8,982.82 -1,684.28 2,775.28 5,972,854.43 654,766.63 70°19'57.737 N 148°44'40.16 W 9,940.31 58.76 104.97 8,996.46 -1,690.52 2,795.53 5,972,848.60 654,787.01 70'19'57.676 N 148°44'39.57 W 9,973.77 61.35 98.67 9,013.17 -1,696.43 2,823.89 5,972,843.26 654,815.48 70°19'57.618 N 148°44'38.74 W 10,000.31 64.25 102.34 9,025.30 -1,700.74 2,847.09 5,972,839.42 654,838.76 70°19'57.575 N 148°44'38.06 W 10,030.36 67.98 106.08 9,037.47 -1,707.50 2,873.71 5,972,833.21 654,865.51 70°19'57.509 N 148°44'37.29 W 10,060.37 71.70 109.95 9,047.82 -1,716.22 2,900.49 5,972,825.03 654,892.45 70°19'57.423 N 148°44'36.50 W 10,090.08 77.09 112.66 9,055.81 -1,726.62 2,927.13 5,972,815.18 654,919.30 70°19'57.320 N 148°44'35.73 W 10,120.19 82.06 117.30 9,061.26 -1,739.12 2,953.95 5,972,803.22 654,946.37 70°19'57.197 N 148°44'34.94 W 10,150.19 86.23 122.91 9,064.32 -1,754.09 2,979.75 5,972,788.78 654,972.46 70°19'57.050 N 148°44'34.19 W 10,180.39 91.63 128.35 9,064.88 -1,771.67 3,004.28 5,972,771.70 654,997.34 70°19'56.877 N 148°44'33.47 W 10,210.60 97.11 131.01 9,062.58 -1,790.89 3,027.45 5,972,752.96 655,020.89 70°19'56.688 N 148°44'32.80 W 10,240.53 98.16 125.57 9,058.60 -1,809.26 3,050.72 5,972,735.06 655,044.53 70°19'56.507 N 148°44'32.12 W 10,270.55 98.53 118.87 9,054.24 -1,825.09 3,075.84 5,972,719.74 655,069.96 70°19'56.351 N 148°44'31.38 W 10,300.63 97.70 112.71 9,049.99 -1,838.04 3,102.64 5,972,707.34 655,097.01 70°19'56.224 N 148°44'30.60 W 10,350.00 97.70 112.71 9,043.37 -1,856.93 3,147.77 5,972,689.37 655,142.51 70°19'56.038 N 148°44'29.28 W TD 8/9/2013 9:15:59AM Page 3 COMPASS 5000.1 Build 61 ram BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-10 - Slot 10 F-10C Survey: MWD Survey Report - Geographic 09 August, 2013 Qbp ri.111 BAKER PRIMES Survey Report-Geographic bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10C Survey Calculation Method: Minimum Curvature Design: F-10C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29 usft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70 usft Longitude: 148°46'31.47 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.15° Well F-10 API No. 500292041000 Well Position +N/-S 0.00 usft Northing: 5,974,482.00 usft Latitude: 70°20'14.307 N +E/-W 0.00 usft Easting: 651,958.00 usft Longitude: 148°46'1.20 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 38.45 usft Wellbore F-10C API no. 500292041003 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2012 7/25/2013 20.28 81.05 57,623 Design F-10C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,940.31 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (1 30.80 0.00 0.00 111.94 Survey Program Date: 8/5/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1:Sperry-Sun BOSS gyro multi(F-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,360.00 9,424.37 MWD(F-10B) MWD MWD-Standard 9,452.50 9,940.31 MWD(F-10CPB1) MWD MWD-Standard 9,971.00 12,088.00 MWD(F-10C) MWD MWD-Standard 8/9/2013 9:4705AM Page 2 COMPASS 5000.1 Build 61 BAKERMill MOMS Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 it 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00©66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10C Survey Calculation Method: Minimum Curvature Design: F-10C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Fasting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,940.31 58.76 104.97 8,996.46 -1,690.52 2,795.53 5,972,848.60 654,787.01 70°19'57.676 N 148°44'39.57 W' TIP 9,971.00 61.12 99.18 9,011.84 -1,696.06 2,821.49 5,972,843.59 654,813.07 70°19'57.621 N 148°44'38.81 W KOP 10,000.89 70.81 99.77 9,023.99 -1,700.55 2,848.39 5,972,839.64 654,840.05 70°19'57.577 N 148°44'38.02 W 10,030.89 77.52 103.89 9,032.18 -1,706.48 2,876.61 5,972,834.29 654,868.38 70°19'57.519 N 148°44'37.20 W 10,060.91 82.34 109.24 9,037.43 -1,714.91 2,904.92 5,972,826.43 654,896.85 70°19'57.436 N 148°44'36.37 W 10,091.17 86.59 114.07 9,040.35 -1,726.02 2,932.89 5,972,815.89 654,925.05 70°19'57.326 N 148°44'35.56 W 10,121.12 88.47 119.70 9,041.64 -1,739.55 2,959.57 5,972,802.91 654,951.99 70°19'57.193 N 148°44'34.78 W 10,151.24 88.34 125.71 9,042.48 -1,755.81 2,984.89 5,972,787.17 654,977.64 70°19'57.033 N 148°44'34.04 W 10,181.12 88.16 131.76 9,043.39 -1,774.49 3,008.18 5,972,768.96 655,001.29 70°19'56.849 N 148°44'33.36 W 10,221.19 86.44 128.80 9,045.28 -1,800.36 3,038.71 5,972,743.72 655,032.34 70°19'56.595 N 148°44'32.47 W 10,249.86 88.77 125.51 9,046.48 -1,817.66 3,061.53 5,972,726.89 655,055.51 70°19'56.425 N 148°44'31.80 W 10,280.97 89.69 121.50 9,046.90 -1,834.82 3,087.47 5,972,710.25 655,081.78 70°19'56.256 N 148°44'31.05 W 10,311.02 88.77 116.90 9,047.30 -1,849.48 3,113.69 5,972,696.13 655,108.30 70°19'56.111 N 148°44'30.28 W 10,340.89 89.11 111.73 9,047.86 -1,861.77 3,140.90 5,972,684.39 655,135.74 70°19'55.990 N 148°44'29.49 W 10,371.14 89.48 105.44 9,048.23 -1,871.41 3,169.55 5,972,675.34 655,164.59 70°19'55.895 N 148°44'28.65 W 10,401.04 92.43 108.74 9,047.73 -1,880.19 3,198.12 5,972,667.14 655,193.33 70°19'55.809 N 148°44'27.81 W 10,431.23 90.15 114.22 9,047.05 -1,891.24 3,226.19 5,972,656.66 655,221.61 70°19'55.700 N 148°44'27.00 W 10,460.95 91.72 119.11 9,046.56 -1,904.57 3,252.74 5,972,643.87 655,248.42 70°19'55.569 N 148°44'26.22 W 10,491.04 89.63 124.05 9,046.21 -1,920.32 3,278.36 5,972,628.64 655,274.36 70°19'55.414 N 148°44'25.47 W 10,520.96 89.39 119.64 9,046.47 -1,936.10 3,303.77 5,972,613.38 855,300.08 70°19'55.259 N 148°44'24.73 W 10,551.02 89.29 115.83 9,046.81 -1,950.04 3,330.40 5,972,599.99 655,326.98 70°19'55.121 N 148°44'23.95 W 10,581.86 90.28 113.26 9,046.93 -1,962.80 3,358.47 5,972,587.80 655,355.30 70°19'54.996 N 148°44'23.13 W 10,611.18 88.83 110.78 9,047.16 -1,973.79 3,385.65 5,972,577.36 655,382.70 70°19'54.888 N 148°44'22.34 W 10,641.22 88.83 105.42 9,047.77 -1,983.12 3,414.18 5,972,568.61 655,411.41 70°19'54.796 N 148°44'21.51 W 10,671.20 90.61 99.58 9,047.92 -1,989.61 3,443.44 5,972,562.72 655,440.79 70°19'54.732 N 148°44'20.65 W ' 10,701.16 90.34 94.17 9,047.67 -1,993.19 3,473.17 5,972,559.74 655,470.59 70°19'54.696 N 148°44'19.79 W 10,731.09 90.71 88.86 9,047.39 -1,993.98 3,503.08 5,972,559.56 655,500.50 70°19'54.688 N 148°44'18.91 W 10,761.18 89.32 81.70 9,047.39 -1,991.51 3,533.05 5,972,562.64 655,530.41 70°19'54.713 N 148°44'18.04 W 10,790.96 90.52 76.22 9,047.43 -1,985.81 3,562.26 5,972,568.93 655,559.51 70°19'54.769 N 148°44'17.18 W 10,822.18 91.90 70.42 9,046.77 -1,976.85 3,592.15 5,972,578.49 655,589.20 70°19'54.857 N 148°44'16.31 W 10,853.54 90.92 64.97 9,045.99 -1,964.96 3,621.14 5,972,590.96 655,617.95 70°19'54.973 N 148°44'15.46 W 10,881.01 90.46 60.40 9,045.66 -1,952.36 3,645.54 5,972,604.06 655,642.08 70°19'55.097 N 148°44'14.75 W 10,911.18 90.55 55.63 9,045.40 -1,936.38 3,671.12 5,972,620.55 655,667.33 70°19'55.254 N 148°44'14.00 W 10,941.10 87.82 48.50 9,045.82 -1,918.00 3,694.70 5,972,639.40 655,690.53 70°19'55.435 N 148°44'13.32 W 10,979.16 90.03 41.67 9,046.54 -1,891.15 3,721.63 5,972,666.79 655,716.91 70°19'55.699 N 148°44'12.53 W 11,010.08 92.40 38.24 9,045.88 -1,867.46 3,741.48 5,972,690.87 655,736.27 70°19'55.932 N 148°44'11.95 W j 11,039.92 94.27 45.40 9,044.14 -1,845.28 3,761.33 5,972,713.45 655,755.67 70°19'56.150 N 148°44'11.37 W 11,069.98 92.40 51.30 9,042.39 -1,825.34 3,783.74 5,972,733.83 655,777.67 70°19'56.346 N 148°44'10.71 W 11,100.05 90.89 56.16 9,041.53 -1,807.57 3,807.97 5,972,752.10 655,801.53 70°19'56.520 N 148°44'10.01 W I 11,130.30 90.15 61.79 9,041.26 -1,791.98 3,833.88 5,972,768.20 655,827.12 70°19'56.674 N 148°44'9.25 W 11,159.89 88.40 67.84 9,041.63 -1,779.40 3,860.64 5,972,781.32 655,853.62 70°19'56.797 N 148°44'8.47 W 11,191.03 89.05 74.37 9,042.32 -1,769.32 3,890.08 5,972,791.99 655,882.84 70°19'56.896 N 148°44'7.61 W 11,220.87 89.08 79.88 9,042.81 -1,762.68 3,919.15 5,972,799.23 655,911.77 70°19'56.961 N 148°44'6.76 W 11,250.95 88.71 85.60 9,043.39 -1,758.88 3,948.97 5,972,803.63 655,941.51 70°19'56.999 N 148°44'5.89 W 11,280.99 89.23 90.70 9,043.93 -1,757.91 3,978.98 5,972,805.21 655,971.49 70°19'57.008 N 148°44'5.01 W 11,315.89 89.39 96.96 9,044.35 -1,760.24 4,013.78 5,972,803.58 656,006.33 70°19'56.985 N 148°44'4.00 W 11,340.91 89.54 101.56 9,044.59 -1,764.27 4,038.47 5,972,800.06 656,031.09 70°19'56.945 N 148°44'3.28 W 11,375.97 90.61 107.83 9,044.54 -1,773.15 4,072.37 5,972,791.86 656,065.16 70°19'56.857 N 148°44'2.29 W 11,404.78 88.71 114.10 9,044.71 -1,783.46 4,099.25 5,972,782.10 656,092.25 70°19'56.756 N 148°44'1.50 W 11,434.94 89.69 119.77 9,045.13 -1,797.11 4,126.13 5,972,769.00 656,119.39 70°19'56.622 N 148°44'0.72 W 11,465.19 90.64 124.62 9,045.05 -1,813.22 4,151.72 5,972,753.41 656,145.30 70°19'56.463 N 148°43'59.97 WI 11,494.89 92.82 121.82 9,044.15 -1,829.49 4,176.55 5,972,737.65 656,170.45 70°19'56.303 N 148°43'59.25 W ' 11,524.82 91.54 116.68 9,043.01 -1,844.09 4,202.64 5,972,723.58 656,196.83 70°19'56.159 N 148°43'58.48 W 8/9/2013 9:47:05AM Page 3 COMPASS 5000.1 Build 61 Mill BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10C Survey Calculation Method: Minimum Curvature Design: F-10C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (^) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,557.83 90.25 110.36 9,042.49 -1,857.26 4,232.88 5,972,711.03 656,227.34 70°19'56.029 N 148"43'57.60 W 11,584.91 89.82 106.09 9,042.48 -1,865.73 4,258.60 5,972,703.09 656,253.22 70°19'55.946 N 148"43'56.85 W � 11,614.89 89.48 100.33 9,042.66 -1,872.57 4,287.77 5,972,696.83 656,282.52 70°19'55.879 N 148°43'56.00 W : 11,644.81 90.58 96.53 9,042.65 -1,876.96 4,317.36 5,972,693.05 656,312.19 70°19'55.835 N 148°43'55.13 W 11,674.56 90.09 91.26 9,042.47 -1,878.98 4,347.03 5,972,691.63 656,341.89 70°19'55.815 N 148°43'54.27 W I I 11,704.75 90.03 86.74 9,042.44 -1,878.45 4,377.21 5,972,692.77 656,372.05 70°19'55.820 N 148°43'53.39 W'i 11,734.85 89.45 81.01 9,042.58 -1,875.24 4,407.13 5,972,696.58 656,401.89 70°19'55.852 N 148°43'52.51 W 11,764.75 88.99 75.89 9,042.98 -1,869.26 4,436.41 5,972,703.16 656,431.05 70°19'55.910 N 148°43'51.66 W 11,794.93 88.59 74.81 9,043.62 -1,861.63 4,465.60 5,972,711.38 656,460.08 70°19'55.985 N 148°43'50.81 W 11,824.79 89.08 79.80 9,044.23 -1,855.07 4,494.72 5,972,718.53 656,489.05 70°19'56.050 N 148°43'49.96 W 11,856.87 90.12 85.92 9,044.45 -1,851.08 4,526.53 5,972,723.15 656,520.78 70°19'56.089 N 148°43'49.03 W 11,889.94 90.25 90.72 9,044.35 -1,850.11 4,559.58 5,972,724.79 656,553.79 70°19'56.098 N 148°43'48.06 W 11,919.64 89.94 96.25 9,044.30 -1,851.92 4,589.21 5,972,723.59 656,583.45 70°19'56.080 N 148"43'47.20 W 11,950.68 89.72 101.97 9,044.39 -1,856.83 4,619.85 5,972,719.30 656,614.18 70°19'56.031 N 148°43'46.30 W 11,980.73 89.75 108.20 9,044.53 -1,864.65 4,648.85 5,972,712.07 656,643.33 70°19'55.954 N 148°43'45.46 W 12,010.63 89.69 113.17 9,044.67 -1,875.21 4,676.81 5,972,702.08 656,671.50 70°19'55.850 N 148°43'44.64 W 12,040.68 90.09 118.71 9,044.73 -1,888.35 4,703.82 5,972,689.50 656,698.77 70°19'55.721 N 148°43'43.85 W 12,082.75 90.09 118.71 9,044.67 -1,908.55 4,740.72 5,972,670.04 656,736.07 70°19'55.522 N 148°43'42.77 W PRODUCTION ASSEMBLY 12,088.00 90.09 118.71 9,044.66 -1,911.08 4,745.32 5,972,667.61 656,740.72 70°19'55.497 N 148°43'42.64 W TD-2 3/8" Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter i (usft) (usft) Name (in) (in) 2,678.00 2,677.84 13 3/8" 13.375 17.500 9,250.00 8,419.68 9 5/8" 9.625 12.250 12,088.00 9,044.66 2 3/8" 2.375 3.000 12,082.75 9,044.67 PRODUCTION ASSEMBLY 2.375 3.000 Survey Annotations Measured Vertical Local Coordinates Depth Depth +NI-S +EI-W (usft) (usft) (usft) (usft) Comment 9,940.31 8,996.46 -1,690.52 2,795.53 TIP 9,971.00 9,011.84 -1,696.06 2,821.49 KOP 12,088.00 9,044.66 -1,911.08 4,745.32 TD Checked By: Approved By: Date: 8/9/2013 9:47:05AM Page 4 COMPASS 5000.1 Build 61 2.V3-0 eCG RECEiVED 2S271 AUG 30 2,013 Letter of Transmittal AOGCC raki , BAKER Date: August 27, 2013 otii-A/‘eE3D HUGHES M K BENDER To: I From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. '7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey Please find enclosed the directional survey data for the following well(s): 11-28B D-16BPB1 F-1 OCPB1, F-10C Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: Alt f&P.tae:s4-4.--- , State of Alaska AOGCC DATE: cliSik% RECEIVED AUG 3 0 2013 AOGCC rr.�r BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-10 -Slot 10 F-10C Survey: MWD Survey Report - Geographic 09 August,2013 Mall BAKER HUGHES Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00©66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10C Survey Calculation Method: Minimum Curvature Design: F-10C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29usft Latitude: 70'19'55.283 N From: Map Easting: 650,960.70 usft Longitude: 148°46'31.47 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: 1.15° Well F-10 API No.500292041000 Well Position +N1-S 0.00 usft Northing: 5,974,482.00 usft Latitude: 70"20'14.307 N +E/-W 0.00 usft Easting: 651,958.00 usft Longitude: 148°46 1.20 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 38.45 usft Wellbore F-10C API no. 500292041003 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (1 (nT) BGGM2012 7/25/2013 20.28 81.05 57,623 Design F-100 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,940.31 Vertical Section: Depth From(TVD) +NI-S +E/-W Direction (usft) (usft) (usft) (°) 30 80 0.00 0.00 111.94 Survey Program Date: 8/5/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1 :Sperry-Sun BOSS gyro multi(F-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,360.00 9,424.37 MWD(F-10B) MWD MWD-Standard 9,452.50 9,940.31 MWD(F-10CPB1) MWD MWD-Standard 9,971.00 12,088.00 MWD(F-100) MWD MWD-Standard 8/9/2013 9:47:05AM Page 2 COMPASS 5000 1 Build 61 Vel BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Coordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00©66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10C Survey Calculation Method: Minimum Curvature Design: F-10C Database: EDMRSK-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +EI-W Northing Fasting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,940.31 58 76 104.97 8,996.46 -1,690.52 2,795.53 5,972,848.60 654,787.01 70'19'57.676 N 148'44'39.57 W TIP 9,971.00 61.12 99.18 9,011.84 -1,696.06 2,821.49 5,972,843.59 654,813.07 70°19'57.621 N 148°44'38.81 W KOP 10,000.89 70.81 99.77 9,023.99 -1,700.55 2,848.39 5,972,839.64 654,840.05 70°19'57.577 N 148°44'38.02 W 10,030.89 77.52 103.89 9,032.18 -1,706.48 2,876.61 5,972,834.29 654,868.38 70°19'57.519 N 148°44'37.20 W 10,060.91 82.34 109.24 9,037.43 -1,714.91 2,904.92 5,972,826.43 654,896.85 70°19'57.436 N 148°44'36.37 W 10,091.17 86.59 114.07 9,040.35 -1,726.02 2,932.89 5,972,815.89 654,925.05 70°19'57.326 N 148°44'35.56 W 10,121.12 88.47 119.70 9,041.64 -1,739.55 2,959.57 5,972,802.91 654,951.99 70°19'57.193 N 148°44'34.78 W 10,151.24 88.34 125.71 9,042.48 -1,755.81 2,984.89 5,972,787.17 654,977.64 70°19'57.033 N 148°44'34.04 W 10,181.12 88.16 131.76 9,043.39 -1,774.49 3,008.18 5,972,768.96 655,001.29 70°19'56.849 N 148°44'33.36 W 10,221.19 86.44 128.80 9,045.28 -1,800.36 3,038.71 5,972,743.72 655,032.34 70°19'56.595 N 148°44'32.47 W 10,249.86 88.77 125.51 9,046.48 -1,817.66 3,061.53 5,972,726.89 655,055.51 70°19'56.425 N 148°44'31.80 W 10,280.97 89.69 121.50 9,046.90 -1,834.82 3,087.47 5,972,710.25 655,081.78 70°19'56.256 N 148°44'31.05 W 10,311.02 88.77 116.90 9,047.30 -1,849.48 3,113.69 5,972,696.13 655,108.30 70°19'56.111 N 148°44'30.28 W 10,340.89 89.11 111.73 9,047.86 -1,861.77 3,140.90 5,972,684.39 655,135.74 70°19'55.990 N 148°44'29.49 W 10,371.14 89.48 105.44 9,048.23 -1,871.41 3,169.55 5,972,675.34 655,164.59 70°19'55.895 N 148°44'28.65 W 10,401.04 92.43 108.74 9,047.73 -1,880.19 3,198.12 5,972,667.14 655,193.33 70°19'55.809 N 148°44'27.81 W 10,431.23 90.15 114.22 9,047.05 -1,891.24 3,226.19 5,972,656.66 655,221,61 70°19'55.700 N 148°44'27.00 W 10,460.95 91.72 119.11 9,046.56 -1,904.57 3,252.74 5,972,643.87 655,248.42 70°19'55.569 N 148°44'26.22 W 10,491.04 89.63 124.05 9,046.21 -1,920.32 3,278.36 5,972,628.64 655,274.36 70°19'55.414 N 148°44'25.47 W 10,520.96 89.39 119.64 9,046.47 -1,936.10 3,303.77 5,972,613.38 655,300.08 70°19'55.259 N 148°44'24.73 W 10,551.02 89.29 115.63 9,046.81 -1,950.04 3,330.40 5,972,599.99 655,326.98 70°19'55.121 N 148°44'23.95 W 10,581.86 90.28 113.26 9,046.93 -1,962.80 3,358.47 5,972,587.80 655,355.30 70°19'54.996 N 148°44'23.13 W 10,611.18 88.83 110.78 9,047.16 -1,973.79 3,385.65 5,972,577.36 655,382.70 70°19'54.888 N 148°44'22.34 W 10,641.22 88.83 105.42 9,047.77 -1,983.12 3,414.18 5,972,568.61 655,411.41 70°19'54.796 N 148°44'21.51 W 10,671.20 90.61 99.58 9,047.92 -1,989.61 3,443.44 5,972,562.72 655,440.79 70°19'54.732 N 148°44'20.65 W 10,701.16 90.34 94.17 9,047.67 -1,993.19 3,473.17 5,972,559.74 655,470.59 70°19'54.696 N 148°44'19.79 W 10,731.09 90.71 88.86 9,047.39 -1,993.98 3,503.08 5,972,559.56 655,500.50 70°19'54.688 N 148°44'18.91 W 10,761.18 89.32 81.70 9,047.39 -1,991.51 3,533.05 5,972,562.64 655,530.41 70°19'54.713 N 148°44'18.04 W 10,790.96 90.52 76.22 9,047.43 -1,985.81 3,562.26 5,972,568.93 655,559.51 70°19'54.769 N 148°44'17.18 W 10,822.18 91.90 70.42 9,046.77 -1,976.85 3,592.15 5,972,578.49 655,589.20 70°19'54.857 N 148°44'16.31 W 10,853.54 90.92 64.97 9,045.99 -1,964.96 3,621.14 5,972,590.96 655,617.95 70°19'54.973 N 148°44'15.46 W 10,881.01 90.46 60.40 9,045.66 -1,952.36 3,645.54 5,972,604,06 655,642.08 70°19'55.097 N 148°44'14.75 W 10,911.18 90.55 55.63 9,045.40 -1,936.38 3,671.12 5,972,620.55 655,667.33 70°19'55.254 N 148°44'14.00 W 10,941.10 87.82 48.50 9,045.82 -1,918.00 3,694.70 5,972,639.40 655,690.53 70°19'55.435 N 148°44'13.32 W 10,979.16 90.03 41.67 9,046.54 -1,891.15 3,721.63 5,972,666.79 655,716.91 70°19'55.699 N 148°44'12.53 W 11,010.08 92.40 38.24 9,045.88 -1,867.46 3,741.48 5,972,690.87 655,736.27 70°19'55.932 N 148°44'11.95 W 11,039.92 94.27 45.40 9,044.14 -1,845.28 3,761.33 5,972,713.45 655,755.67 70°19'56.150 N 148°44'11.37 W 11,069.98 92.40 51.30 9,042.39 -1,825.34 3,783.74 5,972,733.83 655,777.67 70°19'56.346 N 148°44'10.71 W 11,100.05 90.89 56.16 9,041.53 -1,807.57 3,807.97 5,972,752.10 655,801.53 70°19'56.520 N 148°44'10.01 W 11,130.30 90.15 61.79 9,041.26 -1,791.98 3,833.88 5,972,768.20 655,827.12 70°19'56.674 N 148°44'9.25 W 1 11,159.89 88.40 67.84 9,041.63 -1,779.40 3,860.64 5,972,781.32 655,853.62 70°19'56.797 N 148°44'8.47 W 11,191.03 89.05 74.37 9,042.32 -1,769.32 3,890.08 5,972,791.99 655,882.84 70°19'56.896 N 148°44'7.61 W 11,220.87 89.08 79.88 9,042.81 -1,762.68 3,919.15 5,972,799.23 655,911.77 70°19'56.961 N 148°44'6.76 W 11,250.95 88.71 85.60 9,043.39 -1,758.88 3,948.97 5,972,803.63 655,941.51 70°19'56.999 N 148°44'5.89 W 11,280.99 89.23 90.70 9,043.93 -1,757.91 3,978.98 5,972,805.21 655,971.49 70°19'57.008 N 148°44'5.01 W 11,315.89 89.39 96.96 9,044.35 -1,760.24 4,013.78 5,972,803.58 656,006.33 70°19'56.985 N 148°44'4.00 W 11,340.91 89.54 101.56 9,044.59 -1,764.27 4,038.47 5,972,800.06 656,031.09 70°19'56.945 N 148°44'3.28 W 11,375.97 90.61 107.83 9,044.54 -1,773.15 4,072.37 5,972,791.86 656,065.16 70°19'56.857 N 148°44'2.29 W 11,404.78 88.71 114.10 9,044.71 -1,783.46 4,099.25 5,972,782.10 656,092.25 70°19'56.756 N 148°44'1.50 W 11,434.94 89.69 119.77 9,045.13 -1,797.11 4,126.13 5,972,769.00 656,119.39 70°19'56.622 N 148°44'0.72 W 11,465.19 90.64 124.62 9,045.05 -1,813.22 4,151.72 5,972,753.41 656,145.30 70°19'56.463 N 148°43'59.97 W 11,494.89 92.82 121.82 9,044.15 -1,829.49 4,176.55 5,972,737.65 656,170.45 70°19'56.303 N 148°43'59.25 W 11,524.82 91.54 116.68 9,043.01 -1,844.09 4,202.64 5,972,723.58 656,196.83 70°19'56.159 N 148°43'58.48 W 8192013 9:47:05AM Page 3 COMPASS 5000.1 Build 61 RGI BAKER HUGHES Survey Report-Geographic 0 bp INT RQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00©66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10C Survey Calculation Method: Minimum Curvature Design: F-10C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,557.83 90.25 110.36 9,042.49 -1,857.26 4,232.88 5,972,711.03 656,227.34 70"19'56.029 N 148°43'57.60 W 11,584.91 89.82 106.09 9,042.48 -1,865.73 4,258.60 5,972,703.09 656,253.22 70°19'55.946 N 148°43'56.85 W 11,614.89 89.48 100.33 9,042.66 -1,872.57 4,287.77 5,972,696.83 656,282.52 70°19'55.879 N 148°43'56.00 W 11,644.81 90.58 96.53 9,042.65 -1,876.96 4,317.36 5,972,693.05 656,312.19 70°19'55.835 N 148°43'55.13 W 11,674.56 90.09 91.26 9,042.47 -1,878.98 4,347.03 5,972,691.63 656,341.89 70°19'55.815 N 148°43'54.27 W 11,704.75 90.03 86.74 9,042.44 -1,878.45 4,377.21 5,972,692.77 656,372.05 70°19'55.820 N 148°43'53.39 W 11,734.85 89.45 81.01 9,042.58 -1,875.24 4,407.13 5,972,696.58 656,401.89 70°19'55.852 N 148°43'52.51 W 11,764.75 88.99 75.89 9,042.98 -1,869.26 4,436.41 5,972,703.16 656,431.05 70°19'55.910 N 148°43'51.66 W 11,794.93 88.59 74.81 9,043.62 -1,861.63 4,465.60 5,972,711.38 656,460.08 70°19'55.985 N 148°43'50.81 W 11,824.79 89.08 79.80 9,044.23 -1,855.07 4,494.72 5,972,718.53 656,489.05 70°19'56.050 N 148°43'49.96 W 11,856.87 90.12 85.92 9,044.45 -1,851.08 4,526.53 5,972,723.15 656,520.78 70°19'56.089 N 148°43'49.03 W 11,889.94 90.25 90.72 9,044.35 -1,850.11 4,559.58 5,972,724.79 656,553.79 70°19'56.098 N 148°43'48.06 W 11,919.64 89.94 96.25 9,044.30 -1,851.92 4,589.21 5,972,723.59 656,583.45 70°19'56.080 N 148°43'47.20 W 11,950.68 89.72 101.97 9,044.39 -1,856.83 4,619.85 5,972,719.30 656,614.18 70°19'56.031 N 148°43'46.30 W 11,980.73 89.75 108.20 9,044.53 -1,864.65 4,648.85 5,972,712.07 , 656,643.33 70°19'55.954 N 148°43'45.46 W 12,010.63 89.69 113.17 9,044.67 -1,875.21 4,676.81 5,972,702.08 656,671.50 70°19'55.850 N 148°43'44.64 W 12,040.68 90.09 118.71 9,044.73 -1,888.35 4,703.82 5,972,689.50 656,698.77 70°19'55.721 N 148°43'43.85 W 12,082.75 90.09 118.71 9,044.67 -1,908.55 4,740.72 5,972,670.04 656,736.07 70°19'55.522 N 148°43'42.77 W PRODUCTION ASSEMBLY 12,088.00 90.09 118.71 9,044.66 -1,911.08 4,745.32 5,972,667.61 656,740.72 70°19'55.497 N 148°43'42.64 W TD-2 3/8" Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2 678 00 2,677.84 13 3/8" 13 375 17 500 9,250.00 8,419.68 9 5/8" 9.625 12.250 12,088.00 9,044.66 2 3/8" 2.375 3.000 12,082.75 9,044.67 PRODUCTION ASSEMBLY 2.375 3.000 Survey Annotations Measured Vertical Local Coordinates Depth Depth +NIS +EI-W (usft) (usft) (usft) (usft) Comment 9,940.31 8,996.46 -1,690.52 2,795.53 TIP 9,971.00 9,011.84 -1,696.06 2,821.49 KOP 12,088.00 9,044.66 -1,911.08 4,745.32 TD Checked By: Approved By: Date: 8/9/2013 9-47.05AM a;;e COMPASS 5000.1 Build 61 a3�- 3 RECEIVED AUG 302013 AOGCC BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-10 - Slot 10 F-10C Survey: MWD Survey Report - Geographic 09 August, 2013 RikII HUGI S Survey Report-Geographic %rN by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling ng Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10C Survey Calculation Method: Minimum Curvature Design: F-10C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point 'Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29 usft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70 usft Longitude: 148°46'31.47 W Position Uncertainty: 0 00 usft Slot Radius: 0.000 in Grid Convergence: 1.15° Well F-10 API No. 500292041000 Well Position +NIS 0.00 usft Northing: 5,974,482.00 usft Latitude: 70°20'14.307 N +E/-W 0.00 usft Easting: 651,958.00 usft Longitude: 148°46'1.20 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 38.45 usft Wellbore F-10C API no. 500292041003 Magnetics Model Name Sample Date Declination Dip Angle Field Strength l°) l°) (nT) BGGM2012 7/25/2013 20 28 81 05 57623 Design F-10C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,940.31 Vertical Section: Depth From(TVD) +Nl-S +EI-W Direction (usft) (usft) (usft) (°) 30.80 0.00 0.00 111.94 Survey Program Date: 8/5/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1:Sperry-Sun BOSS gyro multi(F-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,360.00 9,424.37 MWD(F-10B) MWD MWD-Standard 9,452.50 9,940.31 MWD(F-10CPB1) MWD MWD-Standard 9,971.00 12,088.00 MWD(F-10C) MWD MWD-Standard 8/92013 9:47:05AM Page 2 COMPASS 5000.1 Build 61 BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1 979 00:00(r$66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10C Survey Calculation Method: Minimum Curvature Design: F-10C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,940.31 58.76 104.97 8,996.46 -1,690.52 2,795.53 5,972,848.60 654,787.01 70 19'57.676 N 148'44'39 57 W' TIP 9,971.00 61.12 99.18 9,011.84 -1,696.06 2,821.49 5,972,843.59 654,813.07 70°19'57.621 N 148°44'38.81 W KOP 10,000.89 70.81 99.77 9,023.99 -1,700.55 2,848.39 5,972,839.64 654,840.05 70°19'57.577 N 148°44'38.02 W 10,030.89 77.52 103.89 9,032.18 -1,706.48 2,876.61 5,972,834.29 654,868.38 70°19'57.519 N 148°44'37.20 W 10,060.91 82.34 109.24 9,037.43 -1,714.91 2,904.92 5,972,826.43 654,896.85 70°19'57.436 N 148°44'36.37 W 10,091.17 86.59 114.07 9,040.35 -1,726.02 2,932.89 5,972,815.89 654,925.05 70°19'57.326 N 148°44'35.56 W 10,121.12 88.47 119.70 9,041.64 -1,739.55 2,959.57 5,972,802.91 654,951.99 70°19'57.193 N 148°44'34.78 W 10,151.24 88.34 125.71 9,042.48 -1,755.81 2,984.89 5,972,787.17 654,977.64 70°19'57.033 N 148°44'34.04 W 10,181.12 88.16 131.76 9,043.39 -1,774.49 3,008.18 5,972,768.96 655,001.29 70°19'56.849 N 148°44'33.36 W 10,221.19 86.44 128.80 9,045.28 -1,800.36 3,038.71 5,972,743.72 655,032.34 70°19'56.595 N 148°44'32.47 W 10,249.86 88.77 125.51 9,046.48 -1,817.66 3,061.53 5,972,726.89 655,055.51 70°19'56.425 N 148°44'31.80 W 10,280.97 89.69 121.50 9,046.90 -1,834.82 3,087.47 5,972,710.25 655,081.78 70°19'56.256 N 148°44'31.05 W 10,311.02 88.77 116.90 9,047.30 -1,849.48 3,113.69 5,972,696.13 655,108.30 70°19'56.111 N 148°44'30.28 W 10,340.89 89.11 111.73 9,047.86 -1,861.77 3,140.90 5,972,684.39 655,135.74 70°19'55.990 N 148°44'29.49 W 10,371.14 89.48 105.44 9,048.23 -1,871.41 3,169.55 5,972,675.34 655,164.59 70°19'55.895 N 148°44'28.65 W 10,401.04 92.43 108.74 9,047.73 -1,880.19 3,198.12 5,972,667.14 655,193.33 70°19'55.809 N 148°44'27.81 W 10,431.23 90.15 114.22 9,047.05 -1,891.24 3,226.19 5,972,656.66 655,221.61 70°19'55.700 N 148°44'27.00 W 10,460.95 91.72 119.11 9,046.56 -1,904.57 3,252.74 5,972,643.87 655,248.42 70°19'55.569 N 148°44'26.22 W 10,491.04 89.63 124.05 9,046.21 -1,920.32 3,278.36 5,972,628.64 655,274.36 70°19'55.414 N 148°44'25.47 W 10,520.96 89.39 119.64 9,046.47 -1,936.10 3,303.77 5,972,613.38 655,300.08 70°19'55.259 N 148°44'24.73 W 10,551.02 89.29 115.63 9,046.81 -1,950.04 3,330.40 5,972,599.99 655,326.98 70°19'55.121 N 148°44'23.95 W 10,581.86 90.28 113.26 9,046.93 -1,962.80 3,358.47 5,972,587.80 655,355.30 70°19'54.996 N 148°44'23.13 W 10,611.18 88.83 110.78 9,047.16 -1,973.79 3,385.65 5,972,577.36 655,382.70 70°19'54.888 N 148°44'22.34 W 10,641.22 88.83 105.42 9,047.77 -1,983.12 3,414.18 5,972,568.61 655,411.41 70°19'54.796 N 148°44'21.51 W 10,671.20 90.61 99.58 9,047.92 -1,989.61 3,443.44 5,972,562.72 655,440.79 70°19'54.732 N 148°44'20.65 W 10,701.16 90.34 94.17 9,047.67 -1,993.19 3,473.17 5,972,559.74 655,470.59 70°19'54.696 N 148°44'19.79 W 10,731.09 90.71 88.86 9,047.39 -1,993.98 3,503.08 5,972,559.56 655,500.50 70°19'54.688 N 148°44'18.91 W 10,761.18 89.32 81.70 9,047.39 -1,991.51 3,533.05 5,972,562.64 655,530.41 70°19'54.713 N 148°44'18.04 W 10,790.96 90.52 76.22 9,047.43 -1,985.81 3,562.26 5,972,568.93 655,559.51 70°19'54.769 N 148°44'17.18 W 10,822.18 91.90 70.42 9,046.77 -1,976.85 3,592.15 5,972,578.49 655,589.20 70°19'54.857 N 148°44'16.31 W 10,853.54 90.92 64.97 9,045.99 -1,964.96 3,621.14 5,972,590.96 655,617.95 70°19'54.973 N 148°44'15.46 W 10,881.01 90.46 60.40 9,045.66 -1,952.36 3,645.54 5,972,604.06 655,642.08 70°19'55.097 N 148°44'14.75 W 10,911.18 90.55 55.63 9,045.40 -1,936.38 3,671.12 5,972,620.55 655,667.33 70°19'55.254 N 148°44'14.00 W 10,941.10 87.82 48.50 9,045.82 -1,918.00 3,694.70 5,972,639.40 655,690.53 70°19'55.435 N 148°44'13.32 W 10,979.16 90.03 41.67 9,046.54 -1,891.15 3,721.63 5,972,666.79 655,716.91 70°19'55.699 N 148°44'12.53 W 11,010.08 92.40 38.24 9,045.88 -1,867.46 3,741.48 5,972,690.87 655,736.27 70°19'55.932 N 148°44'11.95 W 11,039.92 94.27 45.40 9,044.14 -1,845.28 3,761.33 5,972,713.45 655,755.67 70°19'56.150 N 148°44'11.37 W 11,069.98 92.40 51.30 9,042.39 -1,825.34 3,783.74 5,972,733.83 655,777.67 70°19'56.346 N 148°44'10.71 W 11,100.05 90.89 56.16 9,041.53 -1,807.57 3,807.97 5,972,752.10 655,801.53 70°19'56.520 N 148°44'10.01 W 11,130.30 90.15 61.79 9,041.26 -1,791.98 3,833.88 5,972,768.20 655,827.12 70°19'56.674 N 148°44'9.25 W 11,159.89 88.40 67.84 9,041.63 -1,779.40 3,860.64 5,972,781.32 655,853.62 70°19'56.797 N 148°44'8.47 W 11,191.03 89.05 74.37 9,042.32 -1,769.32 3,890.08 5,972,791.99 655,882.84 70°19'56.896 N 148°44'7.61 W 11,220.87 89.08 79.88 9,042.81 -1,762.68 3,919.15 5,972,799.23 655,911.77 70°19'56.961 N 148°44'6.76 W 11,250.95 88.71 85.60 9,043.39 -1,758.88 3,948.97 5,972,803.63 655,941.51 70°19'56.999 N 148°44'5.89 W 11,280.99 89.23 90.70 9,043.93 -1,757.91 3,978.98 5,972,805.21 655,971.49 70°19'57.008 N 148°44'5.01 W 11,315.89 89.39 96.96 9,044.35 -1,760.24 4,013.78 5,972,803.58 656,006.33 70°19'56.985 N 148°44'4.00 W 11,340.91 89.54 101.56 9,044.59 -1,764.27 4,038.47 5,972,800.06 656,031.09 70°19'56.945 N 148°44'3.28 W 11,375.97 90.61 107.83 9,044.54 -1,773.15 4,072.37 5,972,791.86 656,065.16 70°19'56.857 N 148°44'2.29 W 11,404.78 88.71 114.10 9,044.71 -1,783.46 4,099.25 5,972,782.10 656,092.25 70°19'56.756 N 148°44'1.50 W 11,434.94 89.69 119.77 9,045.13 -1,797.11 4,126.13 5,972,769.00 656,119.39 70°19'56.622 N 148°44'0.72 W 11,465.19 90.64 124.62 9,045.05 -1,813.22 4,151.72 5,972,753.41 656,145.30 70°19'56.463 N 148°43'59.97 W 11,494.89 92.82 121.82 9,044.15 -1,829.49 4,176.55 5,972,737.65 656,170.45 70°19'56.303 N 148°43'59.25 W 11,524.82 91.54 116.68 9,043.01 -1,844.09 4,202.64 5,972,723.58 656,196.83 70°19'56.159 N 148°43'58.48 W 8/92013 9:47:05AM Page 3 COMPASS 5000.1 Build 61 Mill BAKER HUGHES Survey Report-Geographic 0 bp INTFQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10C Survey Calculation Method: Minimum Curvature Design: F-10C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,557,83 90.25 110.36 9,042.49 -1,857.26 4,232.88 5,972,711.03 656,227.34 70°19'56.029 N 148'43'57.60 W 11,584.91 89.82 106.09 9,042.48 -1,865.73 4,258.60 5,972,703.09 656,253.22 70°19'55,946 N 148°43'56.85 W 11,614.89 89.48 100.33 9,042.66 -1,872.57 4,287.77 5,972,696.83 656,282.52 70°19'55.879 N 148°43'56.00 W 11,644.81 90.58 96.53 9,042.65 -1,876.96 4,317.36 5,972,693.05 656,312.19 70°19'55.835 N 148°43'55.13 W 11,674.56 90.09 91.26 9,042.47 -1,878.98 4,347.03 5,972,691.63 656,341.89 70°19'55.815 N 148°43'54.27 W 11,704.75 90.03 86.74 9,042.44 -1,878.45 4,377.21 5,972,692.77 656,372.05 70°19'55.820 N 148°43'53.39 W 11,734.85 89.45 81.01 9,042.58 -1,875.24 4,407.13 5,972,696.58 656,401.89 70°19'55.852 N 148°43'52.51 W 11,764.75 88.99 75.89 9,042.98 -1,869.26 4,436.41 5,972,703.16 656,431.05 70°19'55.910 N 148°43'51.66 W 11,794.93 88.59 74.81 9,043.62 -1,861.63 4,465.60 5,972,711.38 656,460.08 70°19'55.985 N 148°43'50.81 W 11,824.79 89.08 79.80 9,044.23 -1,855.07 4,494.72 5,972,718.53 656,489.05 70°19'56.050 N 148°43'49.96 W 11,856.87 90.12 85.92 9,044.45 -1,851.08 4,526.53 5,972,723.15 656,520.78 70°19'56.089 N 148°43'49.03 W 11,889.94 90.25 90.72 9,044.35 -1,850.11 4,559.58 5,972,724.79 656,553.79 70°19'56.098 N 148°43'48.06 W 11,919.64 89.94 96.25 9,044.30 -1,851.92 4,589.21 5,972,723.59 656,583.45 70°19'56.080 N 148°43'47.20 W 11,950.68 89.72 101.97 9,044.39 -1,856.83 4,619.85 5,972,719.30 656,614.18 70°19'56.031 N 148°43'46.30 W 11,980.73 89.75 108.20 9,044.53 -1,864.65 4,648.85 5,972,712.07 656,643.33 70°19'55.954 N 148°43'45.46 W 12,010.63 89.69 113.17 9,044.67 -1,875.21 4,676.81 5,972,702.08 656,671.50 70°19'55.850 N 148°43'44.64 W 12,040.68 90.09 118.71 9,044.73 -1,888.35 4,703.82 5,972,689.50 656,698.77 70°19'55.721 N 148°43'43.85 W 12,082.75' 90.09 118.71 9,044.67 -1,908.55 4,740.72 5,972,670.04 656,736.07 70°19'55.522 N 148°43'42.77 W PRODUCTION ASSEMBLY 12,088.00 90.09 118.71 9,044.66 -1,911.08 4,745.32 5,972,667.61 656,740.72 70°19'55.497 N .148°43'42.64 W TD-2318" Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,678.00 2,677.84 13 3/8" 13.375 17.500 9,250.00 8,419.68 9 5/8" 9.625 12.250 12,088.00 9,044.66 2 3/8" 2.375 3.000 12,082.75 9,044.67 PRODUCTION ASSEMBLY 2.375 3.000 Survey Annotations Measured Vertical Local Coordinates Depth Depth +NIS +EI-W (usft) (usft) (usft) (usft) Comment 9,940.31 8,996.46 -1,690.52 2,795.53 TIP 9,971.00 9,011.84 -1,696.06 2,821.49 KOP 12,088.00 9,044.66 -1,911.08 4,745.32 TD Checked By: Approved By: Date: • 8/9/2013 9:47:05AM Page 4 COMPASS 5000.1 Build 61 ■SIM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-10 -Slot 10 F-10CPB1 Survey: MWD Survey Report - Geographic 09 August,2013 0 by frail BAKER Survey Report-Geographic 041, -'001`1 bp INCEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10CPB1 Survey Calculation Method: Minimum Curvature Design: F-1OCPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29 usft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70usft Longitude: 148°46'31.47 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.15° II Well F-10 API No.500292041000 Well Position +NI-S 0.00 usft Northing: 5,974,482.00 usft Latitude: 70°20'14.307 N +E/-W 0.00 usft Easting: 651,958.00 usft Longitude: 148°46'1.20 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 38.45 usft Wellbore F-10CPB1 API no. 500292041070 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (1 (nT) BGGM2012 7/25/2013 20 28 81.05 57,623 Design F-10CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,424.37 Vertical Section: Depth From(TVD) +NI-S +EI-W Direction (usft) (usft) (usft) (°) 30 80 0.00 0.00 121 68 Survey Program Date: 8/9/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1 Sperry-Sun BOSS gyro multi(F-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,360.00 9,424.37 MWD(F-10B) MWD MWD-Standard 9,452.50 10,350.00 MWD(F-1OCPB1) MWD MWD-Standard • 8/9/2013 9:15:59AM Page 2 COMPASS WOO 1 Build 61 rill BAKER HUGHES Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10CPB1 Survey Calculation Method: Minimum Curvature Design: F-10CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,424 37 31.90 115.55 8,577.57 -1584.80 2,535.05 5,972,949.01 654,524.45 70°19'58.717 N 148°44'47.17 W TIP 9,452.50 32.14 107.95 8,601.43 -1,590.32 2,548.88 5,972,943.78 654,538.39 70°19'58.662 N 148°44'46.77 W KOP 9,474.83 28.96 110.28 8,620.66 -1,594.02 2559.60 5,972,940.29 654,549.19 70°19'58.626 N 148°44'46.46 W 9,501.02 25.70 113.61 8,643.93 -1,598.49 2,570.76 5,972,936.04 654,560.43 70°19'58.582 N 148°44'46.13 W 9,530.83 22.11 118.53 8,671.18 -1,603.77 2,581.61 5,972,930.99 654,571.39 70°19'58.530 N 148°44'45.81 W 9,560.79 18.77 121.35 8,699.25 -1,608.97 2,590.69 5,972,925.98 654,580.56 70°19'58.479 N 148°44'45.55 W 9,595.09 21.36 120.57 8,731,46 -1,615.02 2,600.78 5,972,920.13 654,590.78 70°19'58.419 N 148°44'45.25 W 9,623.13 22.09 113.83 8,757.52 -1,619.74 2,610.00 5,972,915.59 654,600.09 70°19'58.373 N 148°44'44.98 W 9,650.96 25.10 111.27 8,783.02 -1,624.00 2,620.29 5,972,911.55 654,610.47 70°19'58.331 N 148°44'44.68 W 9,680.24 27.43 107.50 8,809.27 -1,628.28 2,632.51 5,972,907.51 654,622.77 70°19'58.289 N 148°44'44.33 W 9,707.91 29.60 106.81 8,833.59 -1,632.18 2,645.13 5,972,903.88 654,635.47 70°19'58.250 N 148°44'43.96 W 9,741.45 32.72 104.91 8,862.28 -1,636.91 2,661.83 5,972,899.49 654,652.25 70°19'58.204 N 148°44'43.47 W 9,769.78 37.82 104.95 8,885.41 -1,641.12 2,677.63 5,972,895.60 654,668.13 70°19'58.162 N 148°44'43.01 W 9,799.98 43.00 109.68 8,908.40 -1,646.98 2,696.29 5,972,890.11 654,686.91 70°19'58.104 N 148°44'42.47 W 9,828.77 46.28 115,08 8,928.89 -1,654.70 2,714.97 5,972,882.77 654,705.74 70°19'58.028 N 148°44'41.92 W 4 9,859.78 50.25 121.26 8,949.54 -1,665.65 2,735.32 5,972,872.24 654,726.31 70°19'57.921 N 148°44'41.33 W 9,890.07 53.29 114.35 8,968.29 -1,676.71 2,756.36 5,972,861.61 654,747.57 70°19'57.812 N 148°44'40.71 W 9,915.10 55.78 109.35 8,982.82 -1,684.28 2,775.28 5,972,854.43 654,766.63 70°19'57.737 N 148°44'40.16 W 9,940.31 58.76 104.97 8,996.46 -1,690.52 2,795.53 5,972,848.60 654,787.01 70°19'57.676 N 148°44'39.57 W 9,973.77 61.35 98.67 9,013.17 -1,696.43 2,823.89 5,972,843.26 654,815.48 70°19'57.618 N 148°44'38.74 W 10,000.31 64.25 102.34 9,025.30 -1,700.74 2,847.09 5,972,839.42 654,838.76 70°19'57.575 N 148°44'38.06 W 10,030.36 67.98 106.08 9,037.47 -1,707.50 2,873.71 5,972,833.21 654,865.51 70°19'57.509 N 148°44'37.29 W 10,060.37 71.70 109.95 9,047.82 -1,716.22 2,900.49 5,972,825.03 654,892.45 70°19'57.423 N 148°44'36.50 W 10,090.08 77.09 112.66 9,055.81 -1,726.62 2,927.13 5,972,815.18 654,919.30 70°19'57.320 N 148°44 35.73 W 10,120.19 82.06 117.30 9,061.26 -1,739.12 2,953.95 5,972,803.22 654,946.37 70°19'57.197 N 148°44'34.94 W 10,150.19 86.23 122.91 9,064.32 -1,754.09 2,979.75 5,972,788.78 654,972.46 70°19'57.050 N 148°44'34.19 W 10,180.39 91.63 128.35 9,064.88 -1,771.67 3,004.28 5,972,771.70 654,997.34 70°19'56.877 N 148°44'33.47 W 10,210.60 97.11 131.01 9,062.58 -1,790.89 3,027.45 5,972,752.96 655,020.89 70°19'56.688 N 148°44'32.80 W 10,240.53 98.16 125.57 9,058.60 -1,809.26 3,050.72 5,972,735.06 655,044.53 70°19'56.507 N 148°44'32.12 W 10,270.55 98.53 118.87 9,054.24 -1,825.09 3,075.84 5,972,719.74 655,069.96 70°19'56.351 N 148°44'31.38 W 10,300.63 97.70 112.71 9,049.99 -1,838.04 3,102.64 5,972,707.34 655,097.01 70°19'56.224 N 148°44'30.60 W 10,350.00 97.70 112.71 9,043.37 -1,856.93 3,147.77 5,972,689.37 655,142.51 70°19'56.038 N 148°44'29.28 W TD 8/9/2013 9:15:59AM Page 3 COMPASS 5000.1 Build 61 RECEIVEDDATA LOGGED R /3/2013 o 2.013 MKBENDER H AUG17 Letter of Transmittal AOGGC raki , BAKER Date: D TA OGLED i August 27, 2013 � / no13 HUGHES M K BENDER To: ! From: State of Alaska AOGCC ' Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey Please find enclosed the directional survey data for the following well(s): 11-28B D-16BPB1 F-10CPB 1, F-1 OC Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: it11 , State of Alaska AOGCC DATE: °I`3fr3 ?( ' RECEIVED 0232 1 AUG 302013 AOGCC FS kill BAKER • HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-10 -Slot 10 F-10CPB1 Survey: MWD Survey Report - Geographic 09 August,2013 Øbp 161111 sHES UGI S Survey Report-Geographic 0 bp INT EQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: lo:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10CPB1 Survey Calculation Method: Minimum Curvature Design: F-10CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29 usft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70 usft Longitude: 148°46'31.47 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.15° Well F-10 API No. 500292041000 Well Position +NI-S 0.00 usft Northing: 5,974,482.00 usft Latitude: 70 20'14.307 N +E/-W 0.00 usft Easting: 651,958.00 usft Longitude: 148°46'1.20 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 38.45 usft I Wellbore F-10CPB1 API no. 500292041070 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (') (°) (nT) BGGM2012 7/25/2013 20.28 81.05 57,623 Design F-10CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9.424.37 Vertical Section: Depth From(TVD) +NI-S +E1-W Direction ' ;n (usft) (usft) (usft) (°) , 30.80 0.00 0 00 121 68 Survey Program Date: 8/9/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1 :Sperry-Sun BOSS gyro multi(F-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,360.00 9,424.37 MWD(F-10B) MWD MWD-Standard 9,452.50 10,350.00 MWD(F-10CPB1) MWD MWD-Standard 87/92013 9:15:59AM Page 2 COMPASS 5000.1 Build 61 Mall BMUS HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00©66.30usft(generic drilling rig Well: F-10 North Reference: True Wellbore: F-10CPB1 Survey Calculation Method: Minimum Curvature Design: F-10CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Fasting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,424.37 31.90 115.55 8,577.57 -1,584.80 2,535.05 5,972,949.01 654,524.45 70°19'58.717 N 148°44'47.17 W TIP 9,452.50 32.14 107.95 8,601.43 -1,590.32 2548.88 5,972,943.78 654,538.39 70°19'58.662 N 148°44'46.77 W KOP 9,474.83 28.96 110.28 8,620.66 -1,594.02 2,559.60 5,972,940.29 654,549.19 70°19'58.626 N 148°44'46.46 W 9,501.02 25.70 113.61 8,643.93 -1,598.49 2,570.76 5,972,936.04 654,560.43 70°19'58.582 N 148°44'46.13 W 9,530.83 22.11 118.53 8,671.18 -1,603.77 2,581.61 5,972,930.99 654,571.39 70°19'58.530 N 148°44'45.81 W 9,560.79 18.77 121.35 8,699.25 -1,608.97 2,590.69 5,972,925.98 654,580.56 70°19'58.479 N 148°44'45.55 W 9,595.09 21.36 120.57 8,731.46 -1,615.02 2,600.78 5,972,920.13 654,590.78 70°19'58.419 N 148°44'45.25 W 9,623.13 22.09 113.83 8,757.52 -1,619.74 2,610.00 5,972,915.59 654,600.09 70°19'58.373 N 148°44'44.98 W 9,650.96 25.10 111.27 8,783.02 -1,624.00 2,620.29 5,972,911.55 654,610.47 70°19'58.331 N 148°44'44.68 W 9,680.24 27.43 107.50 8,809.27 -1,628.28 2,632.51 5,972,907.51 654,622.77 70°19'58.289 N 148°44'44.33 W 9,707.91 29.60 106.81 8,833.59 -1,632.18 2,645.13 5,972,903.88 654,635.47 70°19'58.250 N 148°44'43.96 W 9,741.45 32.72 104.91 8,862.28 -1,636.91 2,661.83 5,972,899.49 654,652.25 70°19'58.204 N 148°44'43.47 W 9,769.78 37.82 104.95 8,885.41 -1,641.12 2,677.63 5,972,895.60 654,668.13 70°19'58.162 N 148°44'43.01 W 9,799.98 43.00 109.68 8,908.40 -1,646.98 2,696.29 5,972,890.11 654,686.91 70°19'58.104 N 148°44'42.47 W 9,828.77 46.28 115.08 8,928.89 -1,654.70 2,714.97 5,972,882.77 654,705.74 70°19'58.028 N 148°44'41.92 W 9,859.78 50.25 121.26 8,949.54 -1,665.65 2,735.32 5,972,872.24 654,726.31 70°19'57.921 N 148°44'41.33 W 9,890.07 53.29 114.35 8,968.29 -1,676.71 2,756.36 5,972,861.61 654,747.57 70°19'57.812 N 148°44'40.71 W 9,915.10 55.78 109.35 8,982.82 -1,684.28 2,775.28 5,972,854.43 654,766.63 70°19'57.737 N 148°44'40.16 W 9,940.31 58.76 104.97 8,996.46 -1,690.52 2,795.53 5,972,848.60 654,787.01 70°19'57.676 N 148°44'39.57 W 9,973.77 61.35 98.67 9,013.17 -1,696.43 2,823.89 5,972,843.26 654,815.48 70°19'57.618 N 148°44'38.74 W 10,000.31 64.25 102.34 9,025.30 -1,700.74 2,847.09 5,972,839.42 654,838.76 70°19'57.575 N 148°44'38.06 W 10,030.36 67.98 106.08 9,037.47 -1,707.50 2,873.71 5,972,833.21 654,865.51 70°19'57.509 N 148°44'37.29 W 10,060.37 71.70 109.95 9,047.82 -1,716.22 2,900.49 5,972,825.03 654,892.45 70°19'57.423 N 148°44'36.50 W 10,090.08 77.09 112.66 9,055.81 -1,726.62 2,927.13 5,972,815.18 654,919.30 70°19'57.320 N 148°44'35.73 W 10,120.19 82.06 117.30 9,061.26 -1,739.12 2,953.95 .5,972,803.22 654,946.37 70°19'57.197 N 148°44'34.94 W 10,150.19 86.23 122.91 9,064.32 -1,754.09 2,979.75 5,972,788.78 654,972.46 70°19'57.050 N 148°44'34.19 W 10,180.39 91.63 128.35 9,064.88 -1,771.67 3,004.28 5,972,771.70 654,997.34 70°19'56.877 N 148°44'33.47 W 10,210.60 97.11 131.01 9,062.58 -1,790.89 3,027.45 5,972,752.96 655,020.89 70°19'56.688 N 148°44'32.80 W 10,240.53 98.16 125.57 9,058.60 -1,809.26 3,050.72 5,972,735.06 655,044.53 70°19'56.507 N 148°44'32.12 W 10,270.55 98.53 118.87 9,054.24 -1,825.09 3,075.84 5,972,719.74 655,069.96 70°19'56.351 N 148°44'31.38 W 10,300.63 97.70 112.71 9,049.99 -1,838.04 3,102.64 5,972,707.34 655,097.01 70°19'56.224 N 148°44'30.60 W 10,350.00 97.70 112.71 9,043.37 -1,856.93 3,147.77 5,972,689.37 655,142.51 70°19'56.038 N 148°44'29.28 W TD 8/912013 9:15:59AM Page 3 COMPASS 5000.1 Build 61 OF 4,-'\�\\I y 4. THE STATE Alaska Oil and Gas '•a`� OfA VKA Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue �� Anchorage, Alaska 99501-3572 ALAS Main: 907.279.1433 Fax: 907.276.7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-10C BP Exploration (Alaska), Inc. Permit No: 213-086 Surface Location: 2318' FNL, 2871' FEL, SEC. 02, T11N, R13E, UM Bottomhole Location: 4251' FNL, 2002' FWL, SEC. 01, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P Foerster Chair DATED this day of June, 2013. "'4 a r'u'"s. S 9 ti 4 STATE OF ALASKA l` ..,", w ? ALASK . JIL AND GAS CONSERVATION COMMI. .)N y i 2013 PERMIT TO DRILL 20 AAC 25.005 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil ' 0 Service-Winj ®Single Zone . 1 c.Specify if well is proposed for: 0 Drill i 0 Lateral 0 Stratigraphic Test ❑Development Gas 0 Service-Supply 0 Multiple Zone ❑Coalbed Gas 0 Gas Hydrates 0 Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5.Bond 0 Blanket 0 Single Well 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193 ' PBU F-10C • 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12136' ' TVD 8970'ss • Prudhoe Bay/Prudhoe Bay - 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028280 • 2318' FNL,2871' FEL, Sec.02,T11N, R13E, UM • Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 3649' FNL,281'FEL, Sec.01,T11N, R13E, UM August 7,2013 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 4251'FNL,2002'FWL, Sec.01,T11N, R13E, UM 2560 9800' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 66.33' ' feet 15.Distance to Nearest Well Open Surface: x 651958 . y-5974482 • Zone- ASP4 GL Elevation above MSL: 38.45' - feet to Same Pool: 750' 16.Deviated Wells: Kickoff Depth: 9450' feet . 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 100 degrees Downhole: 3203 • Surface: 2323 ' 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks _ Hole Casing Weight Grade Coupling Length MD ND MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 H-511 3626' 8510' 7692'ss 12136' 8970'ss 54 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entryO Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured), 11379' 9033' 10560' 11344' 9032' None Casing Length Size Cement Volume MD ND Conductor/Structural 110' 20"x 30" 7.5 cu yds Concrete 110' 110' Surface 2678' 13-3/8" 3720 cu ft Arctic Set II 2678' 2678' Intermediate 9250' 9-5/8" 1262 cu ft Class'G', 130 cu ft Arctic Set 9250' 8420' Production Liner 616' 7" 278 cu ft Class'G' 8744'-9360' 7965'-8520' Liner 2622' 3-1/2"x 3-3/16"x 2-7/8" 140 cu ft Class'G' 8757'-11379' 7976'-9033' Perforation Depth MD(ft): 10110'- 11320' Perforation Depth ND(ft): 9022'-9032' 20.Attachments: 0 Property Plat ® BOP Sketch 0 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Ron Phillips,564-5913 Printed Name John MoMu Title Engineering Team Leader Email? Ron.Phillips@bp.com Signature - - Phone 564-4711 Date G (tr 1�j ‘''' Commission Use Only Permit To Drill ,�, ,e_,:,, API Number: n Permit Approv.I s,,:: See cover letter for Number: "----/1 �''J —C , , I Li —20410-03-00 I r 1 other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas V contained shales: Other: 13/5pfr 54-71-0 35-e D p5 L Samples Req'd: ❑Yes 'No Mud Log Req'd: ❑Yes I�No H2S Measures: 5 Yes 1:1)4o Directional Survey Req'd: El Yes ❑,No Spacing exception req'd: 0 Yes No inclination-only svy Req'd: 0 Yes No APPROVED BY '13 APPROVED BY // /14..)e---1!) MMISSIONER THE COMMISSION Date'2•Z11/ Form 10-401 Revised 10/20�L Thisf Iafcr 1 f,4nh !om the date of approval(20 AAC 25.005(g)) Submit Form and Atta rpe�ats i upiicate I QL To: Alaska Oil & Gas Conservation Commission b From: Ron Phillips C:1p CTD Engineer Date: June 10, 2013 Re: F-10C Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well F-10B with the SLB/Nordic 1 Coiled Tubing Drilling rig, targeting Zone 2A/1B. Required Permit? Rig Work(scheduled to begin August 7th, 2013) 10-403 PTD 1. MIRU and test BOPE 250 psi low and 3,500 psi high. No Yes 2. Set 3-3/16" monobore whipstock 178° at 9,450' MD. No Yes 3. Mill 2.80" window at 9,450' and 10' of rathole. No Yes 4. Drill 3.00" build and lateral: 2,686' OH, (12 deg DLS planned). No Yes 5. Run 2-3/8" liner leaving TOL at 8,510' MD. No Yes Pump primary cement job: 11.1 bbls, 15.8 ppg,TOC at 9,650' 6. (outside window). No Yes _ 7. Perform liner cleanout and GR/CCL/MCNL log. No Yes 8. Perform injectivity test on liner lap. No Yes 9. Perforate liner based on log interpretation (-700'). No Yes 10. Freeze protect well to 2,500' MD. No Yes 11. Set BPV and RDMO. No Yes Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Set GLV's 3. Set liner top packer with slickline.* 4. ASRC flowback/well test. * Approved alternate plug placement per 20 AAC 25.112(i) Mud Program: • • Milling/drilling: 8.6 ppg PowerVis for milling window and drilling (732 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at , DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15%solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 3.00" From 9,450' MD to 12,136' MD . Liner Program: • 2-3/8", 4.7 lb/ft, L-80, H-511 Solid liner from 8,510' MD— 12,136' MD. • • A minimum of 11.1 bbls of 15.8 ppg cement will be used for liner cementing.(TOC 9,650 MD) • The primary barrier for this operation: a minimum EMW of 8.6 ppg. • • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 1000, inclination at kick off point • is 32°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—9,800'. • • Distance to nearest well within pool—750'. • Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL logs will be run. Perforating: • 1.56", 6 spf, perf guns, 1" CSH work string, & 2-1/16" CSH • The primary barrier for this operation: a minimum EMW of 8.6 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • F-10A center to center: 8'. Parent well abandoned. • F-47 center to center: 357'. Plugged and abandoned. • F-47A center to center: 432'. Plugged and abandoned. Hazards • F pad is an H2S pad. Well F-24 had 160ppm on 5/15/2007. • Most recent H2S level on F-10B is 10ppm recorded on 7/23/2012. • The lost circulation risk in is considered to be high. Reservoir Pressure • The reservoir pressure is expected to be 3,203 psi at 8,800' TVDSS. (7.0 ppg equivalent). • • Maximum expected surface pressure with gas (0.10 psi/ft)to surface is 2,323 psi. • An EMW of 8.6 ppg for this well will provide 732 psi over-balance to the reservoir. Ron Phillips CC: Well File CTD Engineer Joe Lastufka 907-564-5913 TREE= 6'CAN TES: WELLBORE 70'@10052'. *"4-1/2' WELLHEAD= McEVOY �1 f CHR E TBG '""'128'GAP BETWEEN 4-12'TBG w/ ACTUATOR= ORS __...__.................... ._ .......... NO ENTRY GUIDE(§2 8573'&9-5/8'PKR©8701""" KB U.EV= 66.33' BF HEV= 37-68' 1 _...._. 20'CONDUCTOR H110' KOP= 9360' 2105' H4-1/7 ' Max Angle= 34 @ 11300' DfahrmMD- 9812' GAS UFT MANDRELS Dehrm TV D- 8800'SS ST MTD TVD DEV TYPE WV LATCH FORT DATE 4 3293 3293 4 MVIG DOW RK 16 06115/10 13-318'CSG,7211,L-80,ID=1234T H 2678' a 3 5908 5606 38 WAG SO RK 20 06115170 2 7615 6989 33 WAG DMY RK 0 06/13/06 1 8433 7691 29 MG DMY RK 0 06/13/06 Minimum ID=2.37" @ 10231' I I 847? H4-112"HES XMP,D=3.813' 3-3116" X 2-718" XO R MOT H 9-5/8'X 4-1/2'BKR S-3 PKR,ID=3.870' ' , 8527' 114-112'HES XNP,D=3.813' 4-1/7 TBG,12611,13CR-80 —I 85577 _�________-- 8513' H 4-117 MILESFIDE ID=1958' VAMTOP,_0152 bpf,ID=1958' /." 2'TB8701' 11 I,9-518'BKR PID=4.000' 4-1G STUB —I 8701' ' in8743' —14-1/7 OTIS X NP,ID=3-813 TOPOF T LNR —I 8744' 1-- — 8757' —I3-78 BKR DEPLOY SLV,ID=100' F.: 8763' -13-3/4'X 3-1/7 X0,ID=2880' I I 8774' H4lir XNMP(MLLED)ID=3.8(7'1 LNRD NR 3-1/7 1112,9.31/,L-80,_0087 bpf,ID=2990' —I 8777' I I 8776' H3-1/7 I-IDWOD X M ID=2813 ` 4-1/7TBG,1275#,L-8Q ID=3.958' H 8805 ' 8771' H31/2'X33116'XO,ID=2880' . 0, , 8805' —I 41/2'SOS TBG TAIL(SIM)CT LTNll 9-5(8'CSG,471/,L 80,BUTT,ID=8.681' H 9250' I i♦ 0♦1♦ i♦♦♦1 T LMS 2911,Lao,Burr, H 10140' .1♦1111111111 0372 bpf,ID 6.184• /11♦111♦1♦1♦1iWINDOW• MLLOUT WINDOW(F1013] 9360'-9368' TOP OF 1M-IPSTO(X —I 9355' RA TAG H 9365 ♦♦♦♦ 10231' —133116'X2-718X0,113=237T ♦1♦♦♦ 2-7/8 INR,6.16#,L-80,STL_0058 bpf,ID=237' H 11055' 111♦11111 111111111 .1.. 10560' --12-7/8'OBP(06111110) PERFORATION SURMARY 111111111 #41,1 --11"N\ RET LCX: Mal_/CQ I GR ON 06/13103 1,64 TTE N LOG:GEOLOGY PDC LOG 1♦111♦111 ANGLE AT TOP PERE: 91 @ 10590' :♦.1♦4♦.1 Note:Refer to R-Oduction DB for historical pert data SIZE SPF NTER'VAL Opn/S� DATE 4' -J FBTD 2' 6 10110-10140 0 06/11/10 33/16'LI*6.23#L-80,TQ 10231' 2' 6 10190-10220 0 06/11/10 _0076 bpf,ID=2805' 2' 6 10270-10300 0 06/11/10 7 6 10480-10520 0 06/11/10 7 4 10590-10710 C 06/13/03 .a, 2' 4 10760-11150 C 06113103 1111i► 7 4 11200-11320 C 06113103 2-718'l_h1R,6161/,L-80,SR,_0055 bpf,ID=2377 H 11379' DATE REV BY COMMENTS DATE REV BY COMMIS IRUCHDE BAY LTC- , 1212679 ORIGINAL COYPLEi1ON 05129107 JAF/PJC [RLG CRAFT CORREOTIOt'S WELL 1-10B 06106100 CID HOME SIMON ON(F-10A) 09/05106 ROB/PJC PERF OODd2EOiDONS F1IT No:'2030290 06114103 JLMAOC C11D SEETRACK(F-1013I 06118(10 CIS/SV SET(1BP/AIJfHIF(06/11110) AR No: 50-029-20410-02 0M1006 MQFS MO 06118110 TAR/SV GLV 00(06/15110) SEC 2,T11 N R13E 2318'SNL 8 2871'W EL__ 07113(06 KSB(fLH GLV C10 0323107 JLJ/TLH GLV(90 BP Exploration(Alaska) !HEE= 6"CNV VVELLHEAD= McEVOY_ PROPOS._J F-1 0 C SAFI DIES: WELLBORE 70°@ 'W "'4-1/2' ACTUATOR= OTISCHROmt TBG '"`128'GAP BETWEEN 4-1/2"TBG w/ INITIAL KB.Eli 66.33' NO ENTRY GUIDE @ 8573'&9-5/8"PKR @ 8701"" BF.ELEV= 37.68' I t KOP= 9360' 20"CONDUCTOR - 110' J ' II -L 2105' 4-1/2"HES X NP,D=3.813" Max Angle _"( _-' Datum MD= _ GAS LFT MANDI�S Datum TV D= 8800'SS ST MD I V I) DEV TYPE VLV LATCH PORT DATE j 4 3293 3293 4 MMG DMY RK 0 05/08/13 13-3/8"CSG,72#,L-80,D=12.347" -I 2678' 3 5908 5606 38 MAG DMY RK 0 05/08/13 III 2 7615 6989 33 k/MG DMY RK 0 06/13/06 Minimum ID = 1.920" ( 8535' 1 8433 7691 29 TANG DMY RK 0 06/13/06 2-7/8" X 2-3/8" XO , , 8472' -14-112"HES X NP,D=3.813' v 8493' H9-5/8"X 4-1/2"BKR S-3 FKR,D=3.870' /� 8510' -3.70"BKR DEPLOY SLV,D=3.30" 1\ 8523' H3-112"X 2-7/8"XO PUP,ID=2.370" 2-7/8"LNR,6.5#,L-80 STL,.0058 bpf,D=2.441" -I 8535° , + 8525' J--I2-7/8'HES X NP,D=2.313' k- ��\ 852Tn14-1/2"HES X NP,0=3.813" TOP OF 2-3/8"LNR H 8536' 4-1/2'TBG, 12.6#,13CR-80 - 8573' 1 �� 8535' -�2-7/8"X 2-318"XO PUP,D- 1.920" VAM TOP,.0152 bpf,D=3.958" 8573' -14-1/2"MULESHOE,D=3.958' 8701' -9-5/8"BKR PKR ID=4.000' 4-1/2'TBG STUB - 8701' TOP OF 7"LNR - 8744' i-- ' r8743' -1,71-1/2"OT1S X NP,D=3.813' L 8757' -13.75"BKR DEPLOY SLV,D=3.00' 8763' -13-3/4"X 3-1/2'XO,D=2.880' aEHIND lirl I 8774' -4-1/2'XNNP(MLL®)D=3.80" LNR 3-1/2'LNR 9.3#,L-80,.0087 bpf,D=2.990' IH- 8777' I 8776' -3-1/2'HOWCO X NP,D=2.813' 4-1/2'TBG, 12.75#,L-80,D=3.958" H 8805' - / 8777' -i3-1/2"X 3-3/16'XO,D=2.880' 19-5/8"CSG,47#,L-80,BUTT,D=8.681' - 9250' • \--i-----"---[ 8805' H4-1/2"SOS TBG TAIL(BEHIND CT LNR) r7"LNR,29#,L-80 BUTT, -I --9360' 0372 bpf,D=6.184" TOP OF W-IPSTOCK -{ 9450' MLLOUT WNDOW(Fl OB) 9360'-9368' 3-3/16"LNR,6.23#,L-80 TCI, -I --9450 .0076 bpf,D=2.805" 1 MLLOUT WINDOW(F100) 9450'-__ PERFORATION SUMMARY REF LOG: ON XX/XX/XX TSN LOG: ANGLE AT TOP PERE: _°@_ Note:Refer to Production DB for historical perf data SIZE SR= INTERVAL Opn/Sqi SHOT SOZ PBTD 12096' No 2-3/8'LNR,4.7#,L-80 HYD 511,.0039 bpf,D=1.995' - ^-12136' -a DATE REV BY COMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/26/79 _ -ORIGINAL COMPLETION _ WELL: 1100 06/06/00 __ CTD HORIZ.SDTRCK(F-10A) _ PERMIT No. 06/14/03 JLMIKK CTDSIDETRACK(F-10B) AR No: 50-029-20410-01 06/06/06 N2ES RWO SEC 2,T11 N,R13E,2318'FNL&2408'FWL XX/XX/XX NORDIC CTD SIDETRACK(F-10C) 05/21/13 JMD BUILT FROPOSAL BP Exploration(Alaska) a la o. m I Cl) t Q O J o Q a) I co rC o.v •— L E da C Q A O m 48 M W S c a a C.) . DEO Z a` aiiii a CO N 04 Z � CO N Z Q rn a -oz3 m' z 3 n o 3 0 7, U O ' co N W 4 N W Q C N CI O CO h OCa a 0 V N O Ca pI 7 b i? n Z N n 3 a coo Z Op co < m @ o `o 0o p a j O d a 0 0 O- O > Cl) 8 O O 0 Z O j 92 0 J Q N (n 0 al N 0 Y J 15 - .O .. E .(7 Cl) (7, y > 1 w O O (A Ol w, m N C 2 .E c o, o, Y 8v -I N .. .E p O c c C 7t Hw El O o m J J C!' 'O C G O ii OI N C, .8 C CO E t J J 0N ad C eg 4,1 O y C ai uia 2 ;a ° C) N p a c A iI N- 9 w d v N E > > N o 0 K t w a .07. N o CO U I o >O> 0 O 1�0 in A n O O 0 N W E_ 3 f"' 'i' Z N O N O N CD 0 1 O O ' 1 Lc) 0 O O O CO N O N n v, m rn a a. c m D m H 0 OC o ( E '. O o a I o 'l`+ a CO a > n 2 m o 0 C O, N W N m L C K ii c4 LI_ `L c O, A H C C W C O L L Z N N m c •-, Z W 1.3 NN O 0 Z O z a r. r o a m w w Gib- o o 2 ui z c a a- Cl)°in r r r 1 a a c; M O CO Cl) W I L a c N z SII .7 7 3 7 G m x p 7 x a o 0 0 y Q C7 w p = o o o p Y a O O N m N o H O O O O N co d T p .0- d o m Q L c Q O a p Z 3 co z N w O O CO , m Na- a n O a !L LI 5 d NY 1' ' Q) m 2 W 2 E °, m m o m Z a o .- nZ m + +r ao c D Q ,,.. o 2 w z a a LL or_ a c c_ . Y1 't9 tR 1 c v III y c N 0 Oi `1n d E O c ° W 1 a y 7 7 11 d a m _ m b (% O N �� a « a r a° c co ,e c t„..) o m E • — o. o o. E — — — •w - o+ w o L" N Z toga •(in3 3 c a 2 02 i= •v) a ao 3 3 ao 3 Se o a' > > 1 O C) 0 O U) N- CD N V N O 0 O 0 0)o m CD n N O CD O O n U) N O U] N O O O O O ' a aO 0) C) C) CO O) Op OO W m d .- 0 = '0 W o U 0 .� O) Cl) Cl) N C) 0) V co n 0) W CO C CO CO N N- O g N O N CI CD U) C) ? O (D N CO (O n 0 O• U U) Q1 0) V U) C) UD C) O n U) 0) ci C) n co 0) O M4 co a O 0) 0) CD CO a OD 0 Z n n n aD CO CO aD 0) 0 n- x- N C) C) V. a fOD Q d N N N N N N N N c, C) C) C) C) C) C) C) @ o w 4 o 0 j 0 o d m O Z N SII p 5 0) , lD (D O V 0 O 0 0 0 0 0 0 0 0 0 0 0 0 cn N 3 Q O C) O O 0 O O 0 0 0 0 O 0 O 0 O J pp ' 0 ? Oi N N N N N N N N N N N N N U � •-In C r r r r r r r r r r r O Y a LL 1.—) c O o 'C 23 0 Q O • F- W e.. U) NO C) n 0 N (O CO •c/. 01 0) CD U) CO 0 ✓ O CD 0) CD U) 0) a 0 CO V V C) 0) n h.: O Q) C 6 m OD 0) n m N O O 0) N co C CD CD 0) C) CO U) C) N 0) n 0 C ii 0) U) U) U) U) U) O U) n m D) O O ,- .- N N o C v . v a a v v v a a v U) Ui Ul UI U) w W y 7 U) CO U) CD CD CD CD U) CO CD CD U) CD y U7 U) CO J W) W C O p )6 0 CU Y c• ai C (1 ` 7 E .- r- ‘- 4 U] 0) 7 N C) 0) N C) N CD 0) U) 0 4 y V 7 O r O CO O) C) CO N CO CD U) CD 0 CO N I O w ` N V m 2 V d' V (O') N N O� CO CD N 0N) L N �O m n V QI '� T R Ili ), o) 0) 0) a) 0) 0) 01 0) CO CD CO n n N- N- CO CO • O r N d O) C N N N N N N N N N N N N• N N N N �a +K 6-'1 n n n N- CO n N- N- n N- N- N- n n n n • >> p V) t a rn 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) m 0) m F '� 0 fA O O `0 -2 0 Z �. `n ui u) vi Lo- Ili Ui Ui Ui vi (D CD• Ui Ui Ui 1 m a a C c c -0O c m m 7 O (p m mca a) a N N C) nO C) N n CD O G7 N U) CD n U▪ O O (D V 0) 0 n C) C) N .- U) a a N U) co Ce Sa� 3 ?� vi • 0 o v Ci aD n N: v aD m O ro N d C) VU) n 0 O a 0) CD a C) N CD _ N- 0 0) p u) U) U) co U) co CD CD UD n CO 0) O O N Q. C N N N N N N N N N N N C) co- C) C) C] m D a H ., 0 U CL O O N U) 0 N 0 U) U) N 0) C) n N O I OD U co O) N CO N m N W 0 C) C) N CD U) O C) 0) C) n CJ 0) U) n N 0) W 0) o y } co co 0) 0) O 0 N V n V CO N N U) n C U) U) U) co co CO CO (D (D N n n m aDaD CO C1 2▪ 0 0 0 z 8 m 2 2 N N N CO U) W (1) O V N- CO 0 CO CO C) CO N O V N U) V U) CO CO U) O 7 C) O) O) C) O 6 4W6 O U) V) U) U) N- V O) 0) 11 C) U) n U) (O CD 'V O U) GD 0) OD GD n N U) U) U) lD U) N C7 0) W D) 0) W O W D) H co vm co co- co- coco co- co- co- co ai of co co co co- 0 o O LL a p o E 2 T 0) U) N . N 0) n CO 0 0) n C) 0 0 0 I,- 0) U U) co n O C) n O n O C) CD CO O O O '.I U U) OD OD 0) O O N N C) C) C) C) V 4 V CD O r O O O r m r ca a d U) 0 < � m O g Z'LL LL >. d v 1 CV U) m 0 0 0 0 co o m co o0.-n n 0 m 0 o y a 0) r C) n f0 (O )D U) U) U) (D )D N O coaO O U 4n O O O O C C) N x- x- C) C U) CO n W 0 0) 0) CD N Uo CV Col x- N p C) N c O C U 0 03 E a) m f- u; rn 0) C p • La L U • Woo c p oaa) aZ a u L a o 00 Coli Cd o 0 0 0 0 0 0 D o v 0 c 0 IP In O O O NO T p OO 0 p O co O 0) O 6 O O O O O O O N O O O O O O O O O N 0 U0 coV' OM r a . M V 0 N Un O ED OOOOO OOOD 0 CD O p 112,1 O c Wa s O Va4- V O UU IIIIXM o rn NC coW Un CO W O N N C) CR p aO m of of m c o 0 0 0 0 0 0 m d E C c N O O O O O O v CD 0 CO 0) 0 C 0 47CD 0 CD O CCC 0) O O O O O N N CO 0 4- N 4- ' N O O 4- N N M O U Q C' O O O O O W aD 0 O O O 0 O 0 0 O 0 ,- .- .- O '' O) W W W C) Of CO CO CO 0) 0) 0) O) 01 CO 0) 0) W 0) 0) 0) OL) m 0 GP o .D N ...... p U O O N co C 0) m co O O N- LO CO n CD CD 0 lO CD O CO U) N m 0) M CO CL CO nC) CO N [O N CO CO U) CV n O O n n n 47 N 0 O 0 N 0 0) n 0 O V W M N4 0) O) co W n N n CO CO a I M Z C) n n n n n U) CD CO N CO 4- CO 0) 0 V U) CD N- n CO O) O) 0 .- N N CO CO a U) U) CD n n OD CD Q N w M © o CO- CO- CO- CO- CO- M 71-71- v v v c v c c .4: C 0 o 0 > — O CC 0 o d m • -(>7 0) 7 Y ~O N m U) N O O O O O O O O O O O O O O O O O O O O O EB O 0 O O O O O O 0 O O O O O O O O O O O O J m U a N CV N N N N N N N N N N N N N N N N N N N .- r- r r '- 4- 4- e- '- '- .- 4- 4- 4- 4- 4- 4- 4- 4- 4 U) LI-• O 0 a y 0 E d 7 C ❑ G • 2 o 1- 2 W I N- LO n CON C 0) W U) 0) LO CO a M U 47 0 ) CO 1 0) N C�) a CO V CD CO O CD V LO n CO CD CO 47 CO CD O CDhi CD 0 ri CD M ao 0 C') U) 0) 0) 0) 0) CD O CO (O CO n 0) CO CD U) CD n u)CD N U) U) 0) U) U) 0) a U 'O O N N CO R 47 U) CD CO N. CO W C) 0 '- 4- N N M a V U) C 0 c --- M U7 U) U) U) UD LO U) U] N7 U) U) CO CO CO CO CD CO CD CD CO- 2 L Ck U) U) U) U) UD U) U) UD UD UD U] V7 UD UD UD U] U) U) U) U) U) w ? CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CO O 2 CC a• W C d O C W .5 G N U W .5 U V ` 0 co LO O co CO co - U) U) CO R C) n U) CO 0 4- 0 0 O C C U a CD CO n N- 0 M 0 0 CO N N O M LL') 0 LO CO L!] n U) 0 ` .U) N CD CD n n NI- 0 o Oi m m CD CD O O O V m O N Oil • d U h CO '- M CO N LO CD CD UI CO N 0 0 o n CD CD O a) re T A CT CD CD CD CO CO CD CD CO N- n N- N- n N. N- n N- n CD CD CO C) U) L al a C N N N N• N N N N N N N N N N N N CV- N.- N N CV. N u p Z t0 L +K N- O n n n n n n N- n N- N- n n n n n N- n N- N- n > p .NO.. 0) 0 O 0) O D) 0) 0) 0) 0) 0) 0) D) 0) 0) D) 0) Cf Cf 0) 0 J F 2 Z co 0 Z U) U) U) N• U) U) U) U) U) U) U) U) U) U) U) U) u7 U] U] U) -t 0 a U) N N M N- W N a N CD a 0 0) N 0 n 47 O a7 CO n 0) n a OR CO CD a N O _CO N N n N CD CO CC U) n Ui R Ui CV ? N CD M aD n ri O1 V CD N N n O) 0) 0) 0) 0) CO 0 n CD CD CD CD CO CO U) 0 U) U) O V 0) N N CO R 47 U) CD n N- CO W C) O N CO M a U) U) C ,,i- Cl- COM M M COM C V V NCR 47. V Ca 0 W 0 U a M M M O U) n CO '- V CO 0 N W ? V CO N- O) m N n U) CD CD W M O 0) O U) n N O) N N N M O T O N vi U) U'i CD 0 0) N V O 0) O N Ui a) r7 M N N- v- co co co n CD N 0 0) 0) 0 N 47 CD CD CD W 4- Ch a CO 0) 0 C) 0) 0) CO CO CO CD n n CO CO CO CO CO Co co 0) O)_ N N a L L L L L L 0 2 7 co • UI M 4- V n COiI !II HI Cf CDCD M N Q 0 n n N n N n n n n n ao• au ao 0o CO- CO- ao m m aD CD CO a0 ao CO- ao CO- m cn ❑ C• in O co co co O co 47 CO CO C) 0) 4- V CO CO 0) 47 CD CD CD CD CD CO N N. N N n n N CD CD N n n m O O CO co V ? N 0 CO CD CI CO N n 0 U) O • O co m lO n O UI CD n 0) 0) 0 0 0) 0) 0) O N a Qm Cl) o 0 0 0 o n CO 0 0) a n n M 0) 0) n U] V 0 0 O O O O O M n CO n N CD CD CD U) U) U) LO c O O Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 41 0 W 01 0) 0) O 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) co co• Tc ca E. V CO C a L c._ 0 L '0 a O O C o O 2 m Z a a LL LL a V O O 0 V O O V O O a 0 0 V 0 O Q Cl 0 ? O isN O O O N O O N O O N O O N O O N O O W O CCD N a 0 0 0 0 O O O O O O U) O O O 0 0 U) 0 O O O .4- 4) N 0 O O O O 0 N O 0 O) O O n 0 0 V' O 0 U) 0 Cj •� Z' V O UD n n O O O O co 0) O) O O O O _ _ N M M 4- U) U) CO N- n CO N.- 6 is pY2 C 02 0n co co d a= o' U) .0. O C 4 y . d01 C O Id O 2 r C) 0) a) A raj o O O O (o ' o 0 O 0 0 m 0 0 0 rn m 30 . m - me o o o 0 u) c m u) o) Q.. N Oro (moo v CO,- o J N (..1 z : pi< N O_ M U cO a, O U a ca to o 0ce a 0 0 2 m 0) J Y . > O O O O (n J m0 j Q N O d E E LI N N .. j C_ a ❑ G 0) 0) m CO h n (O O O 0) N CI 7 V C) N-- 0 0 .a O7 CL) N CO m C m .c c ER N U' 0 N a, m W = (o (o (o m m o o )n C W V N u0) N N a. O m m - d m 4 E hi .. u m Z. E c 'E' m c 'o c cu m v rCCo ,- CO = IC0 ymw m d o o Ca o N 1- M N m .0 m .0 C N N N N V >❑> Q C L N W Q7 co 0) n N J F 2 Z N ❑ 0 =. )n v) )n u) m M O CO CQ N •N E c O D. L. O o co v rrn Ct v v v ca p) co n co co CL la mD W i- 0 O 0 CL Nv N O m co co LC) el in (O 5 C) (y` 0) 0) 0) 0) y N a_ 2 g m E I m Z N N N N O O O 0 OO O O 0) N- N- N--CD N CD g COCO- CO- CO- ❑ N 0) O O O CO OD (O V 0) lh "Co co 0) co (� O N N- CI 0) N N r— V CO N a (n Cr) o mri a Ta a N m M rn E0 aD V) ; O ` N aD O O O O Q lI 00) 0) 00) 00) U CO( ) O O O C om... TS GDO co E m m J L a N COO N L t If d U 2 0 ` N Q1 N .t -O u- 0 0 C C 0 m O 2 m 7 7 l0 O 2 z d o_ LL ii O o O o 0 CD o O O o co IF N >. O O O (O cn c R III i Ig ` 03 O C +� Oi lawn ❑ Cr. - A ' 0 0 c .. .. N a ` 0 o_ '412 d co o c m c co m a a) c o m • o 0 P) m 0 y (o • (No (N.) Z 0 a—CI) 0 0. 0 N a S CO 0 7-E0 U O N h C (/) a) 0) cm Q V _ a- 3 a O el Z U Q 0 o O o O' 0 o d m 137 Q1 Y Tim co 3 m j Q N a10i U N o E u) 0 a u) O . a m .. a) E _ > .e o H zcW hiu u 2 at 2 re a, c c .. u To 'o c u d ` c w A U• 4) y al i. w CO .C1 /0 >0> C f Z B J . 2 2 e) G 0 0 a) 0) aCO - J H o O 0 O 0 U 0) o T COcci m w C a E• n. .°a m a m O a 2 F OY W v u) CO n CO 0) 4- 4- 4- 4- OF I a CL Q Ls) N CO r- N a0 (c) N- 47 R N V 0 O (D V ' V CO 00 4— 3 0- Tt a0 N (D O cr n O m UN uo CCC N O QrD v n a7 O NC V 0 C) o O n N W N N N N co- 6 6 r) r) r) V V V B + W C_ LE 00 O V 00 N O C) N C) O a0 O 4— V n 0 TO a0 0 N N (O O N (D O (D 0) N O C) U C Oi C) 6 (D fD (() (D 4 OF (A C) J U _ m U0O N 2 h C) W N-) N m OC a co 1� N YQ N U) co co co C) N- Tr 0) N N N N O N Tr O) O) O) C) N N- O O O Ts . C) O 4 N- 0) 0) 0) 6 ? N6 C) CO C) C .- CO CO (D CO ` n n N- n r- n n N- r dC. R) 0 (O (O 0) CD 0) 0) 0) 0) m 0) Q y)7 c0 c0 a0 co- aD co- co- OD c0 aD c0 a0 aD aD Q C13 U T. C m a) -o N O O 0 .7 V V 47 Tr sr C V' V 0 • O a `p C) O O 00 N N N N N N N N 0) O Q O O IA O O O O N O ui O "6 LL 0 0 C 3 N Q'0 (0 N- a0 C) O m O 0 N 0) N- Tr0 CO rA m0 d '7 Tr 0 N r) Ti. N- 0) C) Yn O 2 m d g ` OO W W O O ci- O .- 62 a a )i L a 2 (0 w ' V! c T v d C .. p ^ a 11111 01 d a° ¢ 0 ZS N m Z U• a 'rin3 3 O ''1 0. U N • • • W Val WI g : d .._i + { -N Lige a -, - , + 1 1 4 - CO — $ — �. ZWI - - . , a. $ — -- :g 1 - -O era 5I v 7 - L O i t S o — — M v� F < . 1 m � $ O. o 3 LL,. § k M m lisW= if , b 3 ' ± 14 p p p 4 Oji ff m m L C � .._-- O 7� N IG-p .�.E./.0 en ..oi N w MA 1111 Pa F en 8 - c cry : � p 0 J LII C w m o q-, .1 a O dF (uy}{sn OM(+)A1�oi1/(-)i11noS i . . - - 3 a I ! i C . o Ai Mt iCn71 9 0 8 H o o FL m •.V. o f �� o Frn c+-o2 N OY eno pooNNNNNNeNgM ien - �S mooSo01 R — en0 Ali _- a'n n F M D I'�,�rym N mI Qm V. ai ET -...--Oa LL- 4�8o, oaq g�Ory 4 - - -_N -soLLmRILILIL 'Qmm sseo r -y vZ qO 0 0 0 0 0 0 0 0 0 0 0 0 } F Ya O .g5n 9 S o 4mc4 o 4 4 4 4 4 0 0 0 r -a ,IRd ���i nirr .sir IT_ `i, C. 3d, �S4mN$5i o a m n g NtON0.-.�q. .hvvLo0 rtttpppNNCJmm W m J C o. N. �vl N•'1.qoN•oo.4 virn<Yo a-2 3 dem oL mmmmmm,m..�0 w - o ry 0 0. r�ao °mmmmmmmo m mm o 111/ mmmmm mm ppI�� N $r .. ,71, 181.8412, 71,748,%! vZ rri Z a O$o O<m . J o ^ O 0 0�0000000o IM P a' m 0 .110 aama00000�-.--r c i3a y��ro,<.n.n�mo.o�r.�< J� (ui/13sn OL)mdaa lea! A ani.I. H NI N re wi.0 m a ■■ ■ ■ ■■■ ■■■■■_E■ N 1 .■■ ■ ■■1I EEE■■A■ s ■■ ■■■■ 111=111_■■/II L.. ■■■■IWMI I N '7. - ._ ---- X68 ■ • ' MI I N m ■ • 'n i $ w� o ss. m .s o o m • vl z o F=3 30"'0 _ -- —_._ _ - - –__– e T"s&ceo ;g€;gs : e d m i &ugzmy : ao m oar ■■■ •■ v 1 II.. ■ I MINce g ■■■ - , moo M■■ " _ H e O TO • e C tn n� Q__ m a m 3""F ■ I I w a un s Q IR j11 F. Ai loma ■ g j ■■ ■ m 3 MIME _ N Q r+1 /ME■ 1968 0 .1 I " mirir a 1- 9 0 ■■ a aaooLL ^ a as as M■ -�-_. 4 4- � �6 t� i O N 3 3 c _■ ...El t r - % i -�i:�Jr 111 EEEEEME ■ ■■E■MMM EMI 11•11111 a �k8 0 �� •rt ■■■ M■■■ a MEM ��M■ ■■ N . ..0 l. _ ._ I �■ �S■■ ■■ v " 0 E _ ,o E E E g E - 2 ' § r - gym (m/;sn 56)(+)g1oN/-)4;ns m s • 1 V!! 000Po; L,; ~ 00 oM000000000000 0 30 s '' s e f y po�m�Nn NNn n n c y rem s-es ss ss ssa sssii2sss ssss$ss3_ sss ssSsss'sessa s _ v asail1#0/014iPe11-SiSSSSSs.€�113$�1111 Mama 3 19 NM.-N,O,n1-OVN-VO - 0 R 0�<-<omm<mryom a N o za�S$1 S14!Sin/01 111.1 //Siad§/1z11S1!ifiliaz3 'tin J .N V'LO o01,N N 0 40005000,,cp O re 0 w gs33SSS3SSSla`sa3S333i3SS'33SSSSSSS3SIIISSSSSSSSS3SF$$33s 03 p r NNN,o+lc-1,N+1 MtO+fOpYO 0 > ,„ w 1441414444►01441i411►4114444441114144140 1 144141444414► li . 9� 0 WOONOMNMOW009-<1�0 >a> m R�OO J LL Z NN,OON,o O,n O>NOM W o aLL1LL. g g q ZY O�MaD�IC,G N,DOTNM� g S 'v°Di vaOi voimm mmrnmr'aom rnm o rNo- i sgt s _ S R o w w y F ''. -g e3 sa_s Isss s ss . ssF sill ai a s sss-a,a s ssss o N or-NN,nmMMM,�amNNN CO.-MO. s SS111=1pls1asllg4 a ass F .a 2 � ,q$z$1$) ° i• ,!0—<.1.00 ,M,,00^ o iilid$ iii§ liil! f alp tai., ;=°Sk :S thi M000000000-oo n Lono z22S4 ff SSSP's44S9gS: SaS$ �RSSSS4S 0000000000000000 go�M 41t 4 414 4 4 11 4►11►*94 1►14 t t t t 1 t t t t t t 4 t t t ti/t t i i 1 411114111 4 4 3 g amME4 ti ;Uy 4. 'Hm NOm0000---- .7.1.. ZZ IOI6MOOO,DNNNNmm 6 rc �jun2 gS ¢�OO6paWWm-N-Y1m QOOHI ! wY gal Ny rn- - 4 0 IM3 zn Oom0000 Orm�no0 - m k Y $ �O!�t?(DNOOO m,D,nh 00 d� iR y A N O(G 0 0 0 0 0 0 0 0 0 0 0 MMMOO,TOWTNO,TTN gw1w2 g 0,00.99.9-4-4.91.91- 990 O N N N N N N N N m 0 Td 24OOMOuIGOov)O,n06 NN,WWW-ON.,91 nM u ag a g O O O O O.,:� 'N 3ou Me,n,onmmo-Nm' m`- - m 8 .- O o� / .- R :::--O � �l�,:. N U ,iia 0 � '�� m E z p -', \,z a moa - N a m e c�.0. 7 O SLL Fc O 1 a AshN`A _ o O 18. Qdayfti 0. RS w a) _ ..addifigirtOniaglin, -. 111°111111. 1111N11111\11N w o Ado Uo Ticia 0 Lu,� a.s L o •0 O LL LL �\ �I .- 0,- W LL , Z O N E Z ' c Q 03 In L_ LL 0 0 „- N 8 N I {p N N 1 13 it I I I BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-10 F-10C Plan 1 Travelling Cylinder Report 23 May, 2013 Qbp • Mill BP BAKER HUGHES Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00©66.30usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: F-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore F-10C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 1 Offset TVD Reference: Offset Datum Reference Plan 1 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,424.37 to 12,136.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,410.52 usft Error Surface: Elliptical Conic Survey Tool Program Date 5/23/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1 :Sperry-Sun BOSS gyro multi(F-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,360.00 9,424.37 MWD(F-10B) MWD MWD-Standard 9,424.37 12,136.00 Plan 1 (F-10C) MWD MWD-Standard J Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,678.00 2,611.54 13 3/8" 13.375 17.500 9,250.00 8,353.39 9 5/8" 9.625 12.250 12,136.00 8,970.02 2 7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB F Pad F-03-F-03-F-03 Out of range F-03-F-03A-F-03A Out of range F-04-F-04-F-04 Out of range F-04-F-04A-F-04A Out of range F-04-F-04APB1-F-04APB1 Out of range F-04-F-04B-F-04B 9,683.22 11,681.00 1,230.35 522.62 756.38 Pass-Major Risk F-05-F-05-F-05 Out of range F-10-F-10-F-10 9,424.37 9,425.00 7.56 13.44 -4.96 FAIL-Major Risk F-10-F-10A-F-10A 10,466.41 10,500.00 7.65 38.42 -27.39 FAIL-Major Risk F-10-F-10B-F-10B 9,450.00 9,450.00 0.00 0.84 -0.84 FAIL-Major Risk F-11-F-11A-F-11A Out of range F-11-Plan F-11 C-Plan#6 F-11C Out of range F-15-F-15A-Plan#1(+500) Out of range F-18-F-18-F-18 Out of range F-21_DIMS-F-21 PB1-F-21 PB1 Out of range F-23-F-23-F-23 Out of range F-23-F-23A-F-23A Out of range F-26-F-26-F-26 Out of range F-26-F-26A-F-26A Out of range F-26-F-26B-F-26B Out of range F-27-F-27-F-27 Out of range F-27-F-27A-F-27A Out of range F-27-F-27B-F-27B Out of range F-28-F-28A-F-28A Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 5/23/2013 1:18:14PM Page 2 COMPASS 5000.1 Build 61 • NMI BP BAKER IIIIISHIS Travelling Cylinder Report 0 by 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB F Pad MD Reference: 10:10 12/8/1979 00:00 @ 66.30usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: F-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore F-10C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 1 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB F Pad F-35-F-35-F-35 Out of range F-45-F-45-F-45 9,650.00 9,510.00 1,173.31 484.88 819.93 Pass-Major Risk F-45-F-45B-F-45B 9,650.00 9,750.00 810.56 485.61 480.21 Pass-Major Risk F-46-F-46A-Plan#5 Out of range F-47-F-47-F-47 11,725.00 11,775.00 357.07 563.83 -195.18 FAIL-Major Risk F-47-F-47A-F-47A 11,275.00 11,250.00 431.86 517.13 -77.47 FAIL-Major Risk F-47-F-47B-F-47B 9,650.00 9,600.00 650.74 493.88 269.18 Pass-Major Risk PB G Pad G-29-G-29A-G-29A 9,700.00 12,830.02 658.74 556.48 172.97 Pass-Major Risk G-32-G-32A-G-32A 10,585.26 12,220.00 494.47 552.42 -55.78 FAIL-Major Risk Offset Design PB F Pad- F-04-F-04B-F-04B Offset Site Error: 0.00 usft Survey Program: 100-GYD-GC-MS,9645-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth ♦WS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) Instil (usft) (usft) (°) (usft) (usft) (in) (usft) (unit) (usft) 9,683.22 8,745.86 11,681.00 8,987.88 137.00 33.16 -2.35 -415.80 2,642.43 3.250 1,230.35 522.62 756.38 Pass-Major Risk,CC,ES,SF 9,684.01 8,746.56 11,675.00 8,987.96 137.00 33.11 -2.13 -41251 2,647.44 3.250 1,233.63 522.53 758.99 Pass-Major Risk 9,687.38 8,749.51 11,650.00 8,988.28 137.00 32.92 -122 -398.79 2,668.34 3.250 1,247.51 522.14 770.20 Pass-Major Risk 9,690.83 8,752.51 11,625.00 8,988.43 137.00 32.73 -0.33 -385.40 2,689.45 3.250 1,261.36 521.73 781.52 Pass-Major Risk 9,700.00 8,760.45 11,550.00 8,987.82 137.00 32.15 2.43 -354.02 2,757.48 3.250 1,296.39 520.35 809.44 Pass-Major Risk 9,700.00 8,760.45 11,575.00 8,987.74 137.00 32.34 1.53 -363.91 2,734.52 3.250 1,284.84 520.83 800.08 Pass-Major Risk 9,700.00 8,760.45 11,600.00 8,987.87 13700 32.54 0.61 -373.69 2,711.52 3.250 1,273.83 521.31 791.44 Pass-Major Risk 9,707.44 8,766.83 11,525.00 8,987.84 137.00 31.97 3.29 -342.61 2,779.71 3.250 1,309.67 519.94 820.67 Pass-Major Risk 9,711.35 8,770.15 11,500.00 8,987.91 137.00 31.80 4.08 -32924 2,800.82 3.250 1,325.07 519.59 83424 Pass-Major Risk 9,714.92 8,773.18 11,475.00 8,988.29 137.00 31.65 4.79 -313.85 2,820.51 3.250 1,342.58 519.31 850.17 Pass-Major Risk 9,717.93 8,775.72 11,450.00 8,988.73 137.01 31.52 5.41 -296.47 2,838.46 3.250 1,362.01 519.09 86825 Pass-Major Risk 9,725.00 8,781.63 11,400.00 8,988.45 137.01 31.31 6.43 -256.82 2,868.80 3.250 1,405.14 518.81 909.20 Pass-Major Risk 9,725.00 8,781.63 11,425.00 8,988.64 137.01 31.40 5.97 -277.35 2,854.54 3.250 1,382.99 518.92 888.03 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 5723/2013 1:18:14PM Page 3 COMPASS 5000.1 Build 61 I1 " I Tvg lull g; - Q V r1 K A 11 iy LL 6 8 �� 9us- y 11111111 1 6 0 OuP p `g 1 o I 10 I 0 - 0 tni • v I ci _91 _I _ : i 1 —■MI . : = ,.„ . . : : : , .,:-„, ,L, 1 U e 1 I g n` V p Ft= U Q O it- U I , _. ... Q zq8 x � • 11 0 6 1 f II : I I * I J , III! III Q ..L.- I � . s i— .` I111 III a II 11 11 P 5 ' WE lir I J 0 a Eo n1 V 1 W W r U ..l •� • • /�/ ; • Fr� • III I—I � I I � C �L ! _ 11 . a I��, a I C 11 111 8W I11 M1 LL C W IIIk O t � � 2 ' U I1 g ell !O OC I.- — Er — 1- III N l' 31a U re O : I Z il d z 12 ILI 5' o! rfYIWYI°W r , ® 11 IhI : 17 e0 w II II 9 11 111 ~ i'm °141-11 Y OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME: / 1i 1�o PTD: 2-1 2�i Development Service _Exploratory Stratigraphic Test _Non-Conventional FIELD: /L <—. POOL: ` /LaCX r Ci. I Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - . (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - - ) from records, data and logs acquired for well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than from Dry Ditch Sample where sa30' mpl sre first caught aand 10' sample intervals from below the ls through oafrost rtarget zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 5/2013 U) U) a) 00 (0n (n 2 0 o m 0 7 a) c Q a) o 3 =a3 E L a 0 c (n n n a 0 mo o a) n ao ao o c 3 0 > L — C EU U) U) = n O = -0 d (0 '� N C U N = @ O X (0 17 MN a co n a) o O co0 n o CO O —_ a p a) a) 3 n m c N o a a) - o CD c L..• V) coCW N o CLD 3 0 o co 0 .- Tu o CT m CO > C U) Q z c 7 O O f6 2 n ao 0 o Oo O w j a n m a vo wE NI d C w N @ n O N O o0 J a) N ,— M N N Q — L OO O N ,o O co LL u) d 2 (O co w u" . 0 O to W O N C O w T n N N O 7 m m 02 O ( 2 a) - m w 3 M E U Tri (`a 0) 2 N U_ d -0 CO _ M o 2 -O a) N Orn N Cr F V) E m ate) @ n .3 3 U) n o o d o m i(i a n cCt N EL N O d ti N c 'N 'a .a N 2 0 a) Q Q a) a) m m E C T u) a) E on a) Do 7 3 N C C U aA (0 N N O) N N a) C W @ Ul a3 a3 O 0 0 O O C1 7 N V) (A N CO 0 N 0 0 C O O O o h M .T• E N (0 m -O z 3 2 v ami c c°)) (o) 73 m oE 7 a) 3 N M C -0 CO a) _C 'X .E a E CO0 c O n o c rn F o 0 a_ N n a w W d 0 o 0 U) U) = E. a d 2 2 2 0_ W CI > w 0 Q a) a) a a)) a a)) a a)) a a)) a) a s a)) aa)) aa)) a s a)) a Q Q Q Q Q Q Q Q a) a a)) a) a) 0 Q a) a) a') a) a) 0 Q o aa') Q Q Q p_ Z >- >- >- >- >- >- >- >- >- >- >- >- z z z z z z z Z >- >- >- >- >- Z >- >- >- >- >- )- z Z >- z z z T ~ `o a) rn-in wm m 0 p iii o To c E E 3 — E o O 0 0 .0 o c hi kO N T 3 C_ O N U L O C N '- O O ° a) - 0 > E co _o w co N coo N •Q m `O a) O O N d p j O N N o CI.n a7 O v a) ,O. 2 O LL C J t a3 7 C 7 c8'0OT dig ! N -•-• N - -0J• 15 C > '(p COO ONM a) a) NT Ln0• n M CO O O N m p = L U > in a3 7 i (/) C a) L C (n 7 Q O 7 < (3 N U a) ca .. N W Z -0 0 C a o N C 7 N a) n • D o C a) m 0 0 o) Cl) L a) C O E E — "a C C E @ O co C C in' F O N US 4) C O L_ a) n N L n cn C 2 Q @ U :-'5_ C O V) O A 0 Y o 0 0 o v@ m u o o Q a p m aoi U ° ai d ° @ 3 ° > m Y o.N 2 Q o o a) m S > ° m o m o 0 0 > o f 1° io m Q a o n a o m o a) m n cC _ o E n c c a) -c _o 0 0 0 c cu 7 — n o o = _ 3 3 a) o _0 m 3 c E e d Q co 7 a 0 0 ° N 0 w a) a) -a E ate) )L i C 0 (n M y -ca.' a o u, o n 0 '-c o T En E ... Z u) c a) _n _n n n m 3 3 as m 0 ,, o -o a .- = 3 c 2 O a a) c n m o 3 a) as a) o w U n o c o _ Clam I'D a.. a -0 o@ 'a o o 0 o a n 71) a) o a) E o s o m o o ° a o o N -0 E ao) 0 E s m o o 0_ a) 3 c , 06 J a) d 'a N N 0 ° 7 7 d C �t o 0o D_ a) a) Y -O a) 'p (� E O) o :«. 7 Co N. 0 2 L a) a) (6 O O O) a) n (o (a)n n L .- •'0 V) a) O- a7 (6 (0 N a) 0 O N 0) C O 3 N "0 N to 'O U E a) 3 CO a3 . a) .0 @ C D7 7 7 N a3 N O = "O 2 C. N 0 O Q `m c n n ._ V >, n 3 r a) c ami ami > m c m a) a o- Y ° o o 0 o m > a a) ri Il (0 0 -o -o -o o ._ N 0 9 'a 0 u) in ,(FO L ur 0 L C C c E 0 a) o L c c o c as o a o n S o w .� o °) m c m c 0 E 3 0 a) a) c U) c c E a) 3 2 b5 0 0 n) (6 0 .0a m = a) a) Is ow 1° = c o a) ai a) 0 COc z c o o a o `o o Y o o c o 0 o m o m r u o E o .� a C� fn - o c o 0 0 .0 .> m m a o cu 0_ o 7 0 > > 3 a 7 7 m c) w w o 3 c L o f O co ill:'J U ma)ma) •.� a) a) a) -oo n n a) a) m a) 3 C o o 3 2 2 2 m a 0 -o -o = O O _c O n aa) a` co) m 'm a) o m Uco_ _ID co ooaac� Qaz owouopQ , Q - acocoo Ng 0 00) v) 0 0 ---- W n '1/4c r- N M V (17 M 00 0) O N M V (C) (0 N Q) O N M V (() (0 (0 CA NJ I EO N CO V .0 (0 N- CO CO N N N N N N N N N N M C) C) C) C) M M M (`') M U co co co C C G O C — ON — (N — N V 0 V) Ce OD 0 OS in N a) 0 O CO O0.(7) Wa O (` C OD O O E /`, J N N N c (� O /� J # c a 0 `c w 0_ 0 0 (� W o E ° ((1) a > a) 0_ u_ 5. 2 Q Q w Q C9 a