Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout200-178CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Joseph Lastufka To:Guhl, Meredith D (OGC) Cc:Abbie Barker Subject:Correction to surveys for PBU 04-29A (PTD #195-172) PBU 04-29AL1 (PTD #200-178) and 04-29AL1PB1 Date:Thursday, December 16, 2021 10:07:09 AM Attachments:PBU 04-29AL1PB1_DEV_SURVEY_REPORT.pdf PBU 04-29A_DEV_SURVEY_DATA_FILE.xlsx PBU 04-29A_DEV_SURVEY_REPORT.pdf PBU 04-29AL1_DEV_SURVEY_DATA_FILE.xlsx PBU 04-29AL1_DEV_SURVEY_REPORT.pdf PBU 04-29AL1PB1_DEV_SURVEY_DATA_FILE.xlsx Meredith, Due to a correction on a recently submitted 10-403 for PBU 04-29A (PTD #195-172) TVD at TD, it was determined that the state copy of the submitted 10-407 and attached definitive survey had an error: the vendor used the wrong TVD at the window for 04-29A which effects this well’s TVD from kickoff to TD as well as 04-29AL1 (PTD #200-178) and 04-29AL1PB1. Please see corrected surveys for PBU 04-29A, 04-29AL1 and 04-29AL1PB1, if you have any questions please don’t hesitate to let me know. Thanks! Thanks, Joe Lastufka Sr. Drilling Technologist Hilcorp North Slope, LLC Office: (907)777-8400, Cell:(907)227-8496 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Survey Report - Geographic 15 December, 2021 Design: 04-29AL1 Hilcorp Alaska, LLC Prudhoe Bay 04 04-29 5002921453 04-29AL1 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1Wellbore: Design:04-29AL1 Database:EDM_Master Map System: Geo Datum: Project Map Zone: System Datum:US State Plane 1927 (Exact solution) NAD 1927 (NADCON CONUS) Prudhoe Bay, North Slope, UNITED STATES Alaska Zone 04 Mean Sea Level Using Well Reference Point Using geodetic scale factor Site Position: From: Site Latitude: Longitude: Position Uncertainty: Northing: Easting: Grid Convergence: 04, TR-11-15 Map Slot Radius:0.00 usft usft usft "° 5,953,265.35 711,234.97 0 70.27544380 -148.29108514 1.61 Well Well Position Longitude: Latitude: Easting: Northing: +E/-W +N/-S Position Uncertainty Ground Level: 04-29, 04-29 Wellhead Elevation:0.00 0.00 0.00 5,951,625.46 713,340.54 31.94 70.27080301 -148.27443652 30.70 usft usft usft usft usft usft usft Wellbore Declination (°) Field Strength (nT) Sample Date Dip Angle (°) 04-29AL1 Model NameMagnetics IGRF2000 11/24/2000 26.88 80.85 57,405.88829720 Phase:Version: Audit Notes: Design 04-29AL1 3 ACTUAL Vertical Section:Depth From (TVD) (usft) +N/-S (usft) Direction (°) +E/-W (usft) Tie On Depth:13,256.76 28.06 0.00 0.00 89.28 From (usft) Survey Program DescriptionTool NameSurvey (Wellbore) To (usft) Date 5/26/2021 3_Gyro-CT_pre-1998_Csg1 H073Ga: First generation Continuous Gyro1 : Schlumberger GCT multishot (04-29)94.00 10,094.00 3_MWD A001Mb/ISC4: BGGM declination correction onlyMWD - Standard (04-29A)10,179.00 12,388.64 3_MWD A001Mb/ISC4: BGGM declination correction onlyMWD (04-29AL1PB1)12,400.00 13,256.76 3_MWD A001Mb/ISC4: BGGM declination correction onlyMWD (04-29AL1)13,280.00 13,899.74 Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 28.06 0.00 28.06 0.00 0.000.00 713,340.545,951,625.46 70.27080301 -148.27443652 94.00 0.17 94.00 -0.10 -0.01184.30 713,340.535,951,625.37 70.27080274 -148.27443658 194.00 0.33 194.00 -0.49 0.13149.20 713,340.685,951,624.97 70.27080166 -148.27443547 294.00 0.17 294.00 -0.89 0.26186.00 713,340.825,951,624.58 70.27080059 -148.27443441 394.00 0.08 394.00 -1.08 0.19235.30 713,340.755,951,624.39 70.27080007 -148.27443500 494.00 0.07 494.00 -1.17 0.16152.90 713,340.735,951,624.30 70.27079982 -148.27443524 594.00 0.32 594.00 -1.49 0.27162.50 713,340.855,951,623.98 70.27079894 -148.27443433 694.00 0.30 694.00 -2.02 0.39172.40 713,340.985,951,623.46 70.27079750 -148.27443337 794.00 0.37 793.99 -2.59 0.37189.50 713,340.985,951,622.88 70.27079593 -148.27443352 12/15/2021 4:49:12PM COMPASS 5000.15 Build 90 Page 2 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1Wellbore: Design:04-29AL1 Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 894.00 0.18 893.99 -3.07 0.35169.31 713,340.975,951,622.41 70.27079463 -148.27443372 994.00 0.18 993.99 -3.38 0.35188.80 713,340.985,951,622.10 70.27079379 -148.27443368 1,094.00 0.25 1,093.99 -3.72 0.43151.50 713,341.075,951,621.75 70.27079284 -148.27443303 1,194.00 0.50 1,193.99 -4.29 0.76148.31 713,341.425,951,621.20 70.27079130 -148.27443034 1,294.00 0.40 1,293.99 -4.97 1.16152.20 713,341.835,951,620.53 70.27078944 -148.27442717 1,394.00 0.37 1,393.98 -5.55 1.49147.61 713,342.185,951,619.96 70.27078786 -148.27442445 1,494.00 1.10 1,493.98 -6.03 2.60102.90 713,343.315,951,619.51 70.27078653 -148.27441548 1,594.00 4.12 1,593.86 -7.08 7.03103.31 713,347.775,951,618.59 70.27078368 -148.27437964 1,694.00 7.25 1,693.36 -10.37 16.34113.00 713,357.165,951,615.56 70.27077468 -148.27430438 1,794.00 9.33 1,792.31 -15.90 29.65112.20 713,370.635,951,610.41 70.27075958 -148.27419671 1,894.00 11.82 1,890.60 -22.32 46.84109.11 713,387.995,951,604.49 70.27074205 -148.27405774 1,994.00 15.53 1,987.75 -29.36 69.39106.00 713,410.735,951,598.08 70.27072280 -148.27387536 2,094.00 17.45 2,083.64 -35.99 96.97101.31 713,438.485,951,592.24 70.27070468 -148.27365237 2,194.00 19.38 2,178.52 -41.24 128.1198.00 713,469.755,951,587.87 70.27069034 -148.27340059 2,294.00 20.83 2,272.42 -45.66 162.1996.81 713,503.955,951,584.42 70.27067827 -148.27312495 2,394.00 23.87 2,364.90 -51.07 199.8299.40 713,541.715,951,580.08 70.27066347 -148.27282069 2,494.00 23.75 2,456.39 -58.39 239.51101.50 713,581.605,951,573.88 70.27064347 -148.27249970 2,594.00 25.27 2,547.38 -66.70 280.16101.61 713,622.465,951,566.73 70.27062076 -148.27217104 2,694.00 26.28 2,637.43 -76.13 322.60103.40 713,665.155,951,558.51 70.27059501 -148.27182782 2,794.00 27.55 2,726.59 -86.62 366.63103.40 713,709.465,951,549.27 70.27056634 -148.27147174 2,894.00 31.85 2,813.44 -97.56 414.94102.20 713,758.065,951,539.71 70.27053645 -148.27108110 2,944.00 33.90 2,857.21 -115.00 428.38180.00 713,771.995,951,522.65 70.27048880 -148.27097241 2,994.00 37.22 2,899.94 -132.67 443.99100.90 713,788.095,951,505.44 70.27044054 -148.27084621 3,094.00 38.98 2,978.63 -144.28 504.59100.81 713,848.995,951,495.55 70.27040879 -148.27035620 3,194.00 41.85 3,054.76 -156.67 568.22101.20 713,912.945,951,484.97 70.27037495 -148.26984166 3,294.00 46.55 3,126.43 -169.58 636.71100.20 713,981.775,951,474.01 70.27033966 -148.26928785 3,394.00 50.37 3,192.74 -181.91 710.5298.81 714,055.895,951,463.77 70.27030595 -148.26869101 3,494.00 53.55 3,254.35 -192.71 788.5297.00 714,134.165,951,455.19 70.27027642 -148.26806030 3,594.00 53.87 3,313.56 -199.17 868.8292.20 714,214.615,951,451.01 70.27025876 -148.26741094 3,694.00 53.88 3,372.56 -206.97 949.1498.90 714,295.115,951,445.49 70.27023741 -148.26676148 3,794.00 53.48 3,431.82 -215.90 1,029.1793.81 714,375.365,951,438.84 70.27021301 -148.26611433 3,894.00 52.67 3,491.89 -221.48 1,108.9194.20 714,455.235,951,435.52 70.27019773 -148.26546949 3,994.00 54.30 3,551.39 -227.50 1,189.0694.40 714,535.515,951,431.77 70.27018123 -148.26482145 4,094.00 57.85 3,607.20 -234.61 1,271.7195.40 714,618.335,951,427.01 70.27016179 -148.26415306 4,194.00 58.03 3,660.28 -242.51 1,356.0995.31 714,702.895,951,421.50 70.27014014 -148.26347076 4,294.00 58.48 3,712.89 -250.38 1,440.7795.31 714,787.755,951,416.03 70.27011860 -148.26278607 4,394.00 58.48 3,765.17 -258.13 1,525.6695.11 714,872.835,951,410.70 70.27009741 -148.26209961 4,494.00 57.62 3,818.09 -264.13 1,610.2993.00 714,957.595,951,407.09 70.27008095 -148.26141528 4,594.00 56.88 3,872.19 -267.95 1,694.3192.20 715,041.675,951,405.66 70.27007047 -148.26073591 4,694.00 54.53 3,928.53 -271.55 1,776.8492.81 715,124.275,951,404.40 70.27006057 -148.26006857 4,794.00 55.40 3,985.94 -275.70 1,858.6193.00 715,206.125,951,402.56 70.27004918 -148.25940733 4,894.00 55.12 4,042.93 -280.23 1,940.6693.31 715,288.275,951,400.37 70.27003677 -148.25874386 4,994.00 53.32 4,101.39 -285.88 2,021.5894.70 715,369.315,951,397.01 70.27002126 -148.25808951 5,094.00 53.47 4,161.02 -292.60 2,101.5894.90 715,449.465,951,392.57 70.27000285 -148.25744267 5,194.00 53.43 4,220.58 -300.10 2,181.5695.81 715,529.625,951,387.34 70.26998231 -148.25679594 5,294.00 53.38 4,280.19 -308.36 2,261.4296.00 715,609.685,951,381.35 70.26995968 -148.25615018 5,394.00 53.27 4,339.92 -317.43 2,341.1197.00 715,689.595,951,374.53 70.26993481 -148.25550585 5,494.00 54.90 4,398.58 -327.38 2,421.4897.11 715,770.205,951,366.87 70.26990756 -148.25485596 5,594.00 54.17 4,456.60 -337.81 2,502.2597.61 715,851.245,951,358.73 70.26987899 -148.25420283 5,694.00 54.22 4,515.10 -348.76 2,582.6197.90 715,931.875,951,350.07 70.26984902 -148.25355306 5,794.00 54.22 4,573.57 -360.68 2,662.8699.00 716,012.425,951,340.43 70.26981638 -148.25290422 5,894.00 55.50 4,631.12 -373.69 2,743.5999.31 716,093.485,951,329.71 70.26978075 -148.25225146 5,994.00 54.85 4,688.23 -387.89 2,824.44100.61 716,174.705,951,317.81 70.26974189 -148.25159774 6,094.00 54.17 4,746.29 -403.22 2,904.40101.11 716,255.065,951,304.75 70.26969990 -148.25095119 6,194.00 54.43 4,804.64 -418.94 2,984.08101.20 716,335.145,951,291.30 70.26965690 -148.25030699 12/15/2021 4:49:12PM COMPASS 5000.15 Build 90 Page 3 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1Wellbore: Design:04-29AL1 Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 6,294.00 54.25 4,862.94 -434.79 3,063.76101.31 716,415.245,951,277.71 70.26961349 -148.24966269 6,394.00 54.38 4,921.27 -451.07 3,143.34101.81 716,495.245,951,263.69 70.26956893 -148.24901929 6,494.00 54.17 4,979.66 -467.47 3,222.85101.50 716,575.185,951,249.56 70.26952403 -148.24837644 6,594.00 54.37 5,038.06 -482.26 3,302.6699.50 716,655.385,951,237.03 70.26948353 -148.24773113 6,694.00 54.30 5,096.37 -496.30 3,382.68100.40 716,735.765,951,225.27 70.26944508 -148.24708413 6,794.00 54.13 5,154.84 -510.53 3,462.5499.81 716,815.995,951,213.31 70.26940610 -148.24643841 6,894.00 54.25 5,213.35 -524.83 3,542.37100.50 716,896.185,951,201.28 70.26936694 -148.24579300 6,994.00 55.17 5,271.13 -538.29 3,622.8698.50 716,977.035,951,190.10 70.26933005 -148.24514215 7,094.00 55.85 5,327.76 -548.91 3,704.5996.31 717,059.025,951,181.81 70.26930095 -148.24448135 7,194.00 54.07 5,385.17 -557.83 3,785.9896.20 717,140.625,951,175.20 70.26927646 -148.24382332 7,294.00 53.78 5,444.06 -566.85 3,866.3096.61 717,221.165,951,168.46 70.26925172 -148.24317389 7,394.00 53.55 5,503.31 -576.39 3,946.2997.00 717,301.385,951,161.19 70.26922553 -148.24252715 7,494.00 53.52 5,562.74 -587.10 4,025.9998.31 717,381.355,951,152.74 70.26919615 -148.24188273 7,594.00 53.38 5,622.29 -599.12 4,105.4298.90 717,461.095,951,142.98 70.26916320 -148.24124053 7,694.00 52.93 5,682.26 -611.44 4,184.4998.81 717,540.475,951,132.91 70.26912943 -148.24060122 7,794.00 52.27 5,743.00 -623.05 4,263.0798.00 717,619.355,951,123.53 70.26909758 -148.23996583 7,894.00 52.17 5,804.26 -633.99 4,341.3597.90 717,697.905,951,114.82 70.26906759 -148.23933294 7,994.00 52.93 5,865.07 -644.76 4,420.0197.70 717,776.835,951,106.28 70.26903803 -148.23869701 8,094.00 52.87 5,925.39 -655.73 4,499.0198.11 717,856.105,951,097.55 70.26900794 -148.23805828 8,194.00 52.78 5,985.81 -666.97 4,577.8998.11 717,935.275,951,088.56 70.26897710 -148.23742051 8,294.00 52.37 6,046.59 -677.75 4,656.5797.50 718,014.225,951,080.00 70.26894750 -148.23678438 8,394.00 51.98 6,107.91 -688.68 4,734.7998.40 718,092.725,951,071.30 70.26891753 -148.23615190 8,494.00 51.97 6,169.51 -700.12 4,812.7398.31 718,170.955,951,062.07 70.26888612 -148.23552177 8,594.00 51.43 6,231.49 -711.53 4,890.3898.40 718,248.885,951,052.87 70.26885483 -148.23489401 8,694.00 50.90 6,294.20 -722.91 4,967.4498.40 718,326.235,951,043.68 70.26882361 -148.23427099 8,794.00 50.53 6,357.52 -734.08 5,044.0398.20 718,403.105,951,034.69 70.26879294 -148.23365176 8,894.00 50.03 6,421.42 -744.79 5,120.1997.81 718,479.545,951,026.14 70.26876354 -148.23303595 8,994.00 49.82 6,485.80 -755.19 5,196.0097.81 718,555.615,951,017.89 70.26873499 -148.23242303 9,094.00 49.00 6,550.86 -765.38 5,271.2697.61 718,631.115,951,009.84 70.26870701 -148.23181462 9,194.00 50.83 6,615.25 -774.90 5,347.1696.70 718,707.265,951,002.48 70.26868086 -148.23120090 9,294.00 52.18 6,677.50 -783.83 5,424.9296.40 718,785.235,950,995.76 70.26865632 -148.23057226 9,394.00 53.93 6,737.60 -792.18 5,504.4095.61 718,864.915,950,989.66 70.26863334 -148.22992966 9,494.00 54.78 6,795.87 -799.83 5,585.3095.20 718,945.995,950,984.31 70.26861227 -148.22927556 9,594.00 56.13 6,852.58 -806.00 5,667.4393.40 719,028.265,950,980.47 70.26859526 -148.22861152 9,694.00 57.40 6,907.39 -810.75 5,750.9493.11 719,111.865,950,978.09 70.26858212 -148.22793635 9,794.00 57.50 6,961.19 -815.16 5,835.1192.90 719,196.135,950,976.06 70.26856987 -148.22725576 9,894.00 57.23 7,015.12 -819.42 5,919.2292.90 719,280.315,950,974.19 70.26855805 -148.22657575 9,994.00 56.62 7,069.69 -824.03 6,002.8893.40 719,364.085,950,971.96 70.26854529 -148.22589926 10,094.00 55.82 7,125.29 -829.11 6,085.8593.61 719,447.145,950,969.23 70.26853123 -148.22522850 10,179.00 54.83 7,173.65 -834.05 6,155.5794.50 719,516.985,950,966.27 70.26851758 -148.22466475 10,200.00 54.72 7,185.76 -835.42 6,172.6794.65 719,534.115,950,965.39 70.26851381 -148.22452649 10,208.41 52.00 7,190.78 -835.96 6,179.4094.50 719,540.855,950,965.04 70.26851232 -148.22447211 10,276.13 48.82 7,233.93 -840.26 6,231.4094.97 719,592.955,950,962.21 70.26850045 -148.22405167 10,308.21 48.11 7,255.21 -842.37 6,255.3295.14 719,616.925,950,960.78 70.26849461 -148.22385828 10,339.88 48.05 7,276.36 -844.52 6,278.7995.32 719,640.445,950,959.30 70.26848869 -148.22366855 10,371.10 46.82 7,297.48 -846.69 6,301.6895.50 719,663.385,950,957.78 70.26848272 -148.22348348 10,434.13 43.39 7,341.96 -851.12 6,346.1095.90 719,707.915,950,954.61 70.26847052 -148.22312432 10,528.80 43.07 7,410.95 -856.43 6,410.7293.50 719,772.645,950,951.13 70.26845584 -148.22260191 10,621.79 43.18 7,478.82 -860.65 6,474.1494.10 719,836.165,950,948.71 70.26844419 -148.22208909 10,715.87 42.07 7,548.04 -864.71 6,537.7293.20 719,899.835,950,946.46 70.26843294 -148.22157505 10,809.77 41.30 7,618.16 -868.46 6,600.0593.70 719,962.245,950,944.47 70.26842253 -148.22107108 10,904.31 41.03 7,689.34 -872.86 6,662.1394.40 720,024.415,950,941.84 70.26841038 -148.22056921 10,997.64 40.72 7,759.91 -877.65 6,723.0294.60 720,085.405,950,938.77 70.26839714 -148.22007694 11,090.61 39.35 7,831.09 -882.65 6,782.6195.00 720,145.115,950,935.46 70.26838333 -148.21959513 11,185.69 38.83 7,904.88 -887.88 6,842.3395.00 720,204.955,950,931.93 70.26836891 -148.21911227 12/15/2021 4:49:12PM COMPASS 5000.15 Build 90 Page 4 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1Wellbore: Design:04-29AL1 Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 11,280.18 38.01 7,978.91 -892.94 6,900.8394.90 720,263.575,950,928.53 70.26835492 -148.21863932 11,374.11 36.11 8,053.87 -897.97 6,957.2195.30 720,320.075,950,925.10 70.26834105 -148.21818349 11,468.79 35.31 8,130.75 -903.08 7,012.2495.30 720,375.215,950,921.56 70.26832696 -148.21773861 11,563.07 35.42 8,207.63 -908.59 7,066.5296.30 720,429.635,950,917.58 70.26831176 -148.21729971 11,594.55 36.28 8,233.15 -910.84 7,084.8297.70 720,447.995,950,915.85 70.26830556 -148.21715178 11,626.09 36.45 8,258.54 -913.44 7,103.3498.30 720,466.575,950,913.78 70.26829841 -148.21700207 11,657.92 37.71 8,283.94 -916.25 7,122.3298.50 720,485.635,950,911.51 70.26829070 -148.21684859 11,688.98 37.94 8,308.47 -919.14 7,141.1599.00 720,504.535,950,909.15 70.26828273 -148.21669639 11,721.33 39.30 8,333.75 -922.43 7,161.0799.70 720,524.535,950,906.43 70.26827371 -148.21653534 11,751.79 39.58 8,357.27 -925.82 7,180.12100.50 720,543.675,950,903.58 70.26826439 -148.21638133 11,782.17 40.82 8,380.47 -929.38 7,199.41100.40 720,563.045,950,900.57 70.26825463 -148.21622544 11,845.04 41.78 8,427.71 -936.79 7,240.23100.20 720,604.065,950,894.32 70.26823425 -148.21589541 11,876.65 41.92 8,451.25 -940.38 7,261.0199.40 720,624.945,950,891.32 70.26822439 -148.21572741 11,908.67 41.76 8,475.11 -943.85 7,282.0999.30 720,646.105,950,888.45 70.26821486 -148.21555703 11,938.08 41.57 8,497.08 -946.98 7,301.3999.10 720,665.485,950,885.87 70.26820627 -148.21540101 11,968.93 41.46 8,520.18 -950.20 7,321.5899.00 720,685.755,950,883.23 70.26819743 -148.21523776 12,000.85 41.15 8,544.16 -953.60 7,342.3799.60 720,706.635,950,880.41 70.26818807 -148.21506967 12,059.36 42.16 8,587.87 -960.09 7,380.7299.60 720,745.145,950,875.02 70.26817025 -148.21475970 12,107.60 42.64 8,623.50 -965.85 7,412.73100.80 720,777.315,950,870.17 70.26815442 -148.21450091 12,138.54 43.32 8,646.13 -969.73 7,433.46100.40 720,798.145,950,866.88 70.26814377 -148.21433330 12,170.23 46.82 8,668.51 -973.36 7,455.6098.30 720,820.375,950,863.87 70.26813379 -148.21415437 12,201.33 51.06 8,688.93 -977.29 7,478.71100.90 720,843.585,950,860.60 70.26812300 -148.21396755 12,232.23 55.82 8,707.34 -981.58 7,503.1499.10 720,868.125,950,857.00 70.26811120 -148.21377001 12,262.56 57.64 8,723.97 -985.59 7,528.1899.10 720,893.265,950,853.70 70.26810017 -148.21356759 12,290.17 59.37 8,738.40 -989.21 7,551.4498.60 720,916.625,950,850.74 70.26809021 -148.21337954 12,326.26 60.68 8,756.43 -994.83 7,582.19102.10 720,947.515,950,845.99 70.26807477 -148.21313100 12,356.79 64.20 8,770.56 -1,000.37 7,608.68101.50 720,974.145,950,841.22 70.26805959 -148.21291686 12,388.64 68.46 8,783.34 -1,005.95 7,637.30100.60 721,002.915,950,836.44 70.26804425 -148.21268547 12,400.00 69.50 8,787.41 -1,007.90 7,647.72100.52 721,013.395,950,834.80 70.26803891 -148.21260120 12,418.95 71.24 8,793.78 -1,011.14 7,665.28100.40 721,031.025,950,832.06 70.26803001 -148.21245932 12,425.00 71.87 8,795.70 -1,012.13 7,670.9399.52 721,036.705,950,831.22 70.26802728 -148.21241362 12,449.67 74.48 8,802.84 -1,015.31 7,694.3296.00 721,060.175,950,828.71 70.26801852 -148.21222452 12,475.00 77.14 8,809.05 -1,017.62 7,718.7794.78 721,084.675,950,827.10 70.26801216 -148.21202688 12,480.93 77.76 8,810.33 -1,018.08 7,724.5494.50 721,090.455,950,826.79 70.26801086 -148.21198023 12,488.00 78.75 8,811.77 -1,018.62 7,731.4494.41 721,097.375,950,826.45 70.26800937 -148.21192444 12,521.16 84.23 8,816.68 -1,019.96 7,764.1890.30 721,130.145,950,826.04 70.26800563 -148.21165967 12,550.96 84.76 8,819.54 -1,019.17 7,793.8386.64 721,159.755,950,827.67 70.26800771 -148.21141996 12,580.16 85.29 8,822.07 -1,016.56 7,822.8083.09 721,188.635,950,831.10 70.26801474 -148.21118572 12,610.16 87.22 8,824.03 -1,012.02 7,852.3879.46 721,218.075,950,836.47 70.26802706 -148.21094649 12,646.96 89.69 8,825.03 -1,003.91 7,888.2575.04 721,253.695,950,845.60 70.26804913 -148.21065641 12,678.96 90.57 8,824.95 -994.62 7,918.8771.20 721,284.035,950,855.76 70.26807442 -148.21040880 12,713.76 92.25 8,824.10 -982.22 7,951.3667.04 721,316.165,950,869.07 70.26810819 -148.21014594 12,741.76 92.92 8,822.83 -970.56 7,976.7863.68 721,341.245,950,881.44 70.26813997 -148.20994030 12,773.96 93.74 8,820.96 -954.88 8,004.8357.89 721,368.835,950,897.91 70.26818274 -148.20971342 12,804.76 92.95 8,819.16 -937.55 8,030.2253.49 721,393.715,950,915.95 70.26823000 -148.20950797 12,838.96 93.13 8,817.35 -916.24 8,056.8949.26 721,419.775,950,938.01 70.26828815 -148.20929210 12,867.36 93.30 8,815.76 -896.99 8,077.7145.21 721,440.035,950,957.84 70.26834067 -148.20912366 12,897.36 92.86 8,814.14 -875.30 8,098.3742.03 721,460.075,950,980.10 70.26839985 -148.20895639 12,931.16 93.74 8,812.20 -849.46 8,120.0637.98 721,481.025,951,006.55 70.26847039 -148.20878081 12,962.96 93.66 8,810.14 -823.89 8,138.8434.63 721,499.075,951,032.64 70.26854019 -148.20862869 12,993.36 92.95 8,808.39 -798.31 8,155.1630.41 721,514.655,951,058.67 70.26861003 -148.20849657 13,026.16 91.54 8,807.11 -769.43 8,170.6426.00 721,529.315,951,087.97 70.26868887 -148.20837111 13,056.16 90.75 8,806.51 -741.94 8,182.6121.07 721,540.505,951,115.79 70.26876394 -148.20827406 13,093.16 89.96 8,806.28 -706.90 8,194.4716.31 721,551.355,951,151.15 70.26885963 -148.20817791 13,122.16 91.01 8,806.03 -678.86 8,201.8413.14 721,557.925,951,179.39 70.26893621 -148.20811807 12/15/2021 4:49:12PM COMPASS 5000.15 Build 90 Page 5 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1Wellbore: Design:04-29AL1 Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 13,151.96 93.74 8,804.80 -649.65 8,207.579.08 721,562.835,951,208.75 70.26901599 -148.20807143 13,181.76 92.07 8,803.29 -620.16 8,211.506.09 721,565.925,951,238.34 70.26909656 -148.20803942 13,222.56 91.19 8,802.12 -579.47 8,214.071.15 721,567.345,951,279.08 70.26920771 -148.20801825 13,256.76 91.01 8,801.47 -545.28 8,213.66357.45 721,565.955,951,313.24 70.26930110 -148.20802132 13,279.90 90.39 8,801.18 -522.22 8,211.85353.60 721,563.495,951,336.24 70.26936412 -148.20803572 Kick-off Point 13,280.00 90.39 8,801.18 -522.12 8,211.84353.58 721,563.485,951,336.34 70.26936439 -148.20803581 13,308.98 85.93 8,802.11 -493.26 8,209.58357.47 721,560.405,951,365.13 70.26944325 -148.20805383 13,347.18 88.11 8,804.10 -455.12 8,209.652.74 721,559.395,951,403.25 70.26954742 -148.20805291 13,373.58 88.90 8,804.79 -428.81 8,211.605.74 721,560.605,951,429.61 70.26961931 -148.20803691 13,400.38 89.69 8,805.12 -402.23 8,215.028.91 721,563.265,951,456.27 70.26969190 -148.20800905 13,434.38 92.16 8,804.57 -369.00 8,222.0815.07 721,569.375,951,489.69 70.26978268 -148.20795169 13,469.98 91.37 8,803.47 -334.87 8,232.1217.72 721,578.445,951,524.09 70.26987590 -148.20787018 13,503.98 91.19 8,802.71 -302.82 8,243.4521.24 721,588.865,951,556.44 70.26996340 -148.20777825 13,533.58 92.07 8,801.87 -275.58 8,254.9724.59 721,599.605,951,584.00 70.27003780 -148.20768486 13,572.74 92.16 8,800.43 -239.60 8,270.3721.77 721,613.985,951,620.39 70.27013603 -148.20756000 13,601.74 90.75 8,799.69 -212.52 8,280.7120.01 721,623.545,951,647.76 70.27020999 -148.20747617 13,636.14 88.72 8,799.85 -179.70 8,290.9714.72 721,632.875,951,680.85 70.27029961 -148.20739289 13,670.34 88.81 8,800.59 -146.19 8,297.667.85 721,638.605,951,714.54 70.27039114 -148.20733852 13,702.94 90.31 8,800.84 -113.82 8,301.475.56 721,641.495,951,747.00 70.27047957 -148.20730746 13,733.94 91.72 8,800.29 -82.94 8,304.144.33 721,643.295,951,777.94 70.27056392 -148.20728558 13,767.74 91.10 8,799.46 -49.18 8,304.35356.40 721,642.545,951,811.69 70.27065615 -148.20728354 13,800.34 91.19 8,798.80 -16.76 8,301.06351.99 721,638.335,951,844.00 70.27074473 -148.20730990 13,831.74 94.01 8,797.38 14.25 8,296.35350.76 721,632.755,951,874.87 70.27082946 -148.20734766 13,866.34 96.12 8,794.32 48.37 8,291.50353.05 721,626.935,951,908.83 70.27092268 -148.20738661 13,899.74 97.80 8,790.28 81.39 8,288.65357.10 721,623.155,951,941.76 70.27101290 -148.20740934 13,921.90 97.80 8,787.27 103.32 8,287.54357.10 721,621.425,951,963.64 70.27107281 -148.20741813 Projected to TD 13,922.00 97.80 8,787.25 103.41 8,287.54357.10 721,621.415,951,963.74 70.27107308 -148.20741817 Vertical Depth (usft) Measured Depth (usft) Casing Diameter (") Hole Diameter (")Name Casing Points 13 3/8"2,544.00 2,502.02 13-3/8 17-1/2 9 5/8"10,174.00 7,170.77 9-5/8 12-1/4 7"12,491.00 8,812.35 7 8-1/2 4 1/2"13,870.00 8,793.93 4-1/2 6 2 7/8"13,922.00 8,787.25 2-7/8 3-3/4 Measured Depth (usft) Vertical Depth (usft) +E/-W (usft) +N/-S (usft) Local Coordinates Comment Design Annotations Kick-off Point8,211.85-522.2213,279.90 8,801.18 Projected to TD8,287.54103.3213,921.90 8,787.27 Approved By:Checked By:Date: 12/15/2021 4:49:12PM COMPASS 5000.15 Build 90 Page 6 Survey Report - Geographic 15 December, 2021 Design: 04-29AL1PB1 Hilcorp Alaska, LLC Prudhoe Bay 04 04-29 5002921453 04-29AL1PB1 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1PB1Wellbore: Design:04-29AL1PB1 Database:EDM_Master Map System: Geo Datum: Project Map Zone: System Datum:US State Plane 1927 (Exact solution) NAD 1927 (NADCON CONUS) Prudhoe Bay, North Slope, UNITED STATES Alaska Zone 04 Mean Sea Level Using Well Reference Point Using geodetic scale factor Site Position: From: Site Latitude: Longitude: Position Uncertainty: Northing: Easting: Grid Convergence: 04, TR-11-15 Map Slot Radius:0.00 usft usft usft "° 5,953,265.35 711,234.97 0 70.27544380 -148.29108514 1.61 Well Well Position Longitude: Latitude: Easting: Northing: +E/-W +N/-S Position Uncertainty Ground Level: 04-29, 04-29 Wellhead Elevation:0.00 0.00 0.00 5,951,625.46 713,340.54 31.94 70.27080301 -148.27443652 30.70 usft usft usft usft usft usft usft Wellbore Declination (°) Field Strength (nT) Sample Date Dip Angle (°) 04-29AL1PB1 Model NameMagnetics IGRF2000 12/31/2000 26.83 80.85 57,408.62361440 Phase:Version: Audit Notes: Design 04-29AL1PB1 2 ACTUAL Vertical Section:Depth From (TVD) (usft) +N/-S (usft) Direction (°) +E/-W (usft) Tie On Depth:12,388.64 28.06 0.00 0.00 90.09 From (usft) Survey Program DescriptionTool NameSurvey (Wellbore) To (usft) Date 5/26/2021 3_Gyro-CT_pre-1998_Csg1 H073Ga: First generation Continuous Gyro1 : Schlumberger GCT multishot (04-29)94.00 10,094.00 3_MWD A001Mb/ISC4: BGGM declination correction onlyMWD - Standard (04-29A)10,179.00 12,388.64 3_MWD A001Mb/ISC4: BGGM declination correction onlyMWD (04-29AL1PB1)12,400.00 13,779.76 Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 28.06 0.00 28.06 0.00 0.000.00 713,340.545,951,625.46 70.27080301 -148.27443652 94.00 0.17 94.00 -0.10 -0.01184.30 713,340.535,951,625.37 70.27080274 -148.27443658 194.00 0.33 194.00 -0.49 0.13149.20 713,340.685,951,624.97 70.27080166 -148.27443547 294.00 0.17 294.00 -0.89 0.26186.00 713,340.825,951,624.58 70.27080059 -148.27443441 394.00 0.08 394.00 -1.08 0.19235.30 713,340.755,951,624.39 70.27080007 -148.27443500 494.00 0.07 494.00 -1.17 0.16152.90 713,340.735,951,624.30 70.27079982 -148.27443524 594.00 0.32 594.00 -1.49 0.27162.50 713,340.855,951,623.98 70.27079894 -148.27443433 694.00 0.30 694.00 -2.02 0.39172.40 713,340.985,951,623.46 70.27079750 -148.27443337 794.00 0.37 793.99 -2.59 0.37189.50 713,340.985,951,622.88 70.27079593 -148.27443352 894.00 0.18 893.99 -3.07 0.35169.31 713,340.975,951,622.41 70.27079463 -148.27443372 12/15/2021 4:57:20PM COMPASS 5000.15 Build 90 Page 2 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1PB1Wellbore: Design:04-29AL1PB1 Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 994.00 0.18 993.99 -3.38 0.35188.80 713,340.985,951,622.10 70.27079379 -148.27443368 1,094.00 0.25 1,093.99 -3.72 0.43151.50 713,341.075,951,621.75 70.27079284 -148.27443303 1,194.00 0.50 1,193.99 -4.29 0.76148.31 713,341.425,951,621.20 70.27079130 -148.27443034 1,294.00 0.40 1,293.99 -4.97 1.16152.20 713,341.835,951,620.53 70.27078944 -148.27442717 1,394.00 0.37 1,393.98 -5.55 1.49147.61 713,342.185,951,619.96 70.27078786 -148.27442445 1,494.00 1.10 1,493.98 -6.03 2.60102.90 713,343.315,951,619.51 70.27078653 -148.27441548 1,594.00 4.12 1,593.86 -7.08 7.03103.31 713,347.775,951,618.59 70.27078368 -148.27437964 1,694.00 7.25 1,693.36 -10.37 16.34113.00 713,357.165,951,615.56 70.27077468 -148.27430438 1,794.00 9.33 1,792.31 -15.90 29.65112.20 713,370.635,951,610.41 70.27075958 -148.27419671 1,894.00 11.82 1,890.60 -22.32 46.84109.11 713,387.995,951,604.49 70.27074205 -148.27405774 1,994.00 15.53 1,987.75 -29.36 69.39106.00 713,410.735,951,598.08 70.27072280 -148.27387536 2,094.00 17.45 2,083.64 -35.99 96.97101.31 713,438.485,951,592.24 70.27070468 -148.27365237 2,194.00 19.38 2,178.52 -41.24 128.1198.00 713,469.755,951,587.87 70.27069034 -148.27340059 2,294.00 20.83 2,272.42 -45.66 162.1996.81 713,503.955,951,584.42 70.27067827 -148.27312495 2,394.00 23.87 2,364.90 -51.07 199.8299.40 713,541.715,951,580.08 70.27066347 -148.27282069 2,494.00 23.75 2,456.39 -58.39 239.51101.50 713,581.605,951,573.88 70.27064347 -148.27249970 2,594.00 25.27 2,547.38 -66.70 280.16101.61 713,622.465,951,566.73 70.27062076 -148.27217104 2,694.00 26.28 2,637.43 -76.13 322.60103.40 713,665.155,951,558.51 70.27059501 -148.27182782 2,794.00 27.55 2,726.59 -86.62 366.63103.40 713,709.465,951,549.27 70.27056634 -148.27147174 2,894.00 31.85 2,813.44 -97.56 414.94102.20 713,758.065,951,539.71 70.27053645 -148.27108110 2,944.00 33.90 2,857.21 -115.00 428.38180.00 713,771.995,951,522.65 70.27048880 -148.27097241 2,994.00 37.22 2,899.94 -132.67 443.99100.90 713,788.095,951,505.44 70.27044054 -148.27084621 3,094.00 38.98 2,978.63 -144.28 504.59100.81 713,848.995,951,495.55 70.27040879 -148.27035620 3,194.00 41.85 3,054.76 -156.67 568.22101.20 713,912.945,951,484.97 70.27037495 -148.26984166 3,294.00 46.55 3,126.43 -169.58 636.71100.20 713,981.775,951,474.01 70.27033966 -148.26928785 3,394.00 50.37 3,192.74 -181.91 710.5298.81 714,055.895,951,463.77 70.27030595 -148.26869101 3,494.00 53.55 3,254.35 -192.71 788.5297.00 714,134.165,951,455.19 70.27027642 -148.26806030 3,594.00 53.87 3,313.56 -199.17 868.8292.20 714,214.615,951,451.01 70.27025876 -148.26741094 3,694.00 53.88 3,372.56 -206.97 949.1498.90 714,295.115,951,445.49 70.27023741 -148.26676148 3,794.00 53.48 3,431.82 -215.90 1,029.1793.81 714,375.365,951,438.84 70.27021301 -148.26611433 3,894.00 52.67 3,491.89 -221.48 1,108.9194.20 714,455.235,951,435.52 70.27019773 -148.26546949 3,994.00 54.30 3,551.39 -227.50 1,189.0694.40 714,535.515,951,431.77 70.27018123 -148.26482145 4,094.00 57.85 3,607.20 -234.61 1,271.7195.40 714,618.335,951,427.01 70.27016179 -148.26415306 4,194.00 58.03 3,660.28 -242.51 1,356.0995.31 714,702.895,951,421.50 70.27014014 -148.26347076 4,294.00 58.48 3,712.89 -250.38 1,440.7795.31 714,787.755,951,416.03 70.27011860 -148.26278607 4,394.00 58.48 3,765.17 -258.13 1,525.6695.11 714,872.835,951,410.70 70.27009741 -148.26209961 4,494.00 57.62 3,818.09 -264.13 1,610.2993.00 714,957.595,951,407.09 70.27008095 -148.26141528 4,594.00 56.88 3,872.19 -267.95 1,694.3192.20 715,041.675,951,405.66 70.27007047 -148.26073591 4,694.00 54.53 3,928.53 -271.55 1,776.8492.81 715,124.275,951,404.40 70.27006057 -148.26006857 4,794.00 55.40 3,985.94 -275.70 1,858.6193.00 715,206.125,951,402.56 70.27004918 -148.25940733 4,894.00 55.12 4,042.93 -280.23 1,940.6693.31 715,288.275,951,400.37 70.27003677 -148.25874386 4,994.00 53.32 4,101.39 -285.88 2,021.5894.70 715,369.315,951,397.01 70.27002126 -148.25808951 5,094.00 53.47 4,161.02 -292.60 2,101.5894.90 715,449.465,951,392.57 70.27000285 -148.25744267 5,194.00 53.43 4,220.58 -300.10 2,181.5695.81 715,529.625,951,387.34 70.26998231 -148.25679594 5,294.00 53.38 4,280.19 -308.36 2,261.4296.00 715,609.685,951,381.35 70.26995968 -148.25615018 5,394.00 53.27 4,339.92 -317.43 2,341.1197.00 715,689.595,951,374.53 70.26993481 -148.25550585 5,494.00 54.90 4,398.58 -327.38 2,421.4897.11 715,770.205,951,366.87 70.26990756 -148.25485596 5,594.00 54.17 4,456.60 -337.81 2,502.2597.61 715,851.245,951,358.73 70.26987899 -148.25420283 5,694.00 54.22 4,515.10 -348.76 2,582.6197.90 715,931.875,951,350.07 70.26984902 -148.25355306 5,794.00 54.22 4,573.57 -360.68 2,662.8699.00 716,012.425,951,340.43 70.26981638 -148.25290422 5,894.00 55.50 4,631.12 -373.69 2,743.5999.31 716,093.485,951,329.71 70.26978075 -148.25225146 5,994.00 54.85 4,688.23 -387.89 2,824.44100.61 716,174.705,951,317.81 70.26974189 -148.25159774 6,094.00 54.17 4,746.29 -403.22 2,904.40101.11 716,255.065,951,304.75 70.26969990 -148.25095119 6,194.00 54.43 4,804.64 -418.94 2,984.08101.20 716,335.145,951,291.30 70.26965690 -148.25030699 6,294.00 54.25 4,862.94 -434.79 3,063.76101.31 716,415.245,951,277.71 70.26961349 -148.24966269 12/15/2021 4:57:20PM COMPASS 5000.15 Build 90 Page 3 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1PB1Wellbore: Design:04-29AL1PB1 Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 6,394.00 54.38 4,921.27 -451.07 3,143.34101.81 716,495.245,951,263.69 70.26956893 -148.24901929 6,494.00 54.17 4,979.66 -467.47 3,222.85101.50 716,575.185,951,249.56 70.26952403 -148.24837644 6,594.00 54.37 5,038.06 -482.26 3,302.6699.50 716,655.385,951,237.03 70.26948353 -148.24773113 6,694.00 54.30 5,096.37 -496.30 3,382.68100.40 716,735.765,951,225.27 70.26944508 -148.24708413 6,794.00 54.13 5,154.84 -510.53 3,462.5499.81 716,815.995,951,213.31 70.26940610 -148.24643841 6,894.00 54.25 5,213.35 -524.83 3,542.37100.50 716,896.185,951,201.28 70.26936694 -148.24579300 6,994.00 55.17 5,271.13 -538.29 3,622.8698.50 716,977.035,951,190.10 70.26933005 -148.24514215 7,094.00 55.85 5,327.76 -548.91 3,704.5996.31 717,059.025,951,181.81 70.26930095 -148.24448135 7,194.00 54.07 5,385.17 -557.83 3,785.9896.20 717,140.625,951,175.20 70.26927646 -148.24382332 7,294.00 53.78 5,444.06 -566.85 3,866.3096.61 717,221.165,951,168.46 70.26925172 -148.24317389 7,394.00 53.55 5,503.31 -576.39 3,946.2997.00 717,301.385,951,161.19 70.26922553 -148.24252715 7,494.00 53.52 5,562.74 -587.10 4,025.9998.31 717,381.355,951,152.74 70.26919615 -148.24188273 7,594.00 53.38 5,622.29 -599.12 4,105.4298.90 717,461.095,951,142.98 70.26916320 -148.24124053 7,694.00 52.93 5,682.26 -611.44 4,184.4998.81 717,540.475,951,132.91 70.26912943 -148.24060122 7,794.00 52.27 5,743.00 -623.05 4,263.0798.00 717,619.355,951,123.53 70.26909758 -148.23996583 7,894.00 52.17 5,804.26 -633.99 4,341.3597.90 717,697.905,951,114.82 70.26906759 -148.23933294 7,994.00 52.93 5,865.07 -644.76 4,420.0197.70 717,776.835,951,106.28 70.26903803 -148.23869701 8,094.00 52.87 5,925.39 -655.73 4,499.0198.11 717,856.105,951,097.55 70.26900794 -148.23805828 8,194.00 52.78 5,985.81 -666.97 4,577.8998.11 717,935.275,951,088.56 70.26897710 -148.23742051 8,294.00 52.37 6,046.59 -677.75 4,656.5797.50 718,014.225,951,080.00 70.26894750 -148.23678438 8,394.00 51.98 6,107.91 -688.68 4,734.7998.40 718,092.725,951,071.30 70.26891753 -148.23615190 8,494.00 51.97 6,169.51 -700.12 4,812.7398.31 718,170.955,951,062.07 70.26888612 -148.23552177 8,594.00 51.43 6,231.49 -711.53 4,890.3898.40 718,248.885,951,052.87 70.26885483 -148.23489401 8,694.00 50.90 6,294.20 -722.91 4,967.4498.40 718,326.235,951,043.68 70.26882361 -148.23427099 8,794.00 50.53 6,357.52 -734.08 5,044.0398.20 718,403.105,951,034.69 70.26879294 -148.23365176 8,894.00 50.03 6,421.42 -744.79 5,120.1997.81 718,479.545,951,026.14 70.26876354 -148.23303595 8,994.00 49.82 6,485.80 -755.19 5,196.0097.81 718,555.615,951,017.89 70.26873499 -148.23242303 9,094.00 49.00 6,550.86 -765.38 5,271.2697.61 718,631.115,951,009.84 70.26870701 -148.23181462 9,194.00 50.83 6,615.25 -774.90 5,347.1696.70 718,707.265,951,002.48 70.26868086 -148.23120090 9,294.00 52.18 6,677.50 -783.83 5,424.9296.40 718,785.235,950,995.76 70.26865632 -148.23057226 9,394.00 53.93 6,737.60 -792.18 5,504.4095.61 718,864.915,950,989.66 70.26863334 -148.22992966 9,494.00 54.78 6,795.87 -799.83 5,585.3095.20 718,945.995,950,984.31 70.26861227 -148.22927556 9,594.00 56.13 6,852.58 -806.00 5,667.4393.40 719,028.265,950,980.47 70.26859526 -148.22861152 9,694.00 57.40 6,907.39 -810.75 5,750.9493.11 719,111.865,950,978.09 70.26858212 -148.22793635 9,794.00 57.50 6,961.19 -815.16 5,835.1192.90 719,196.135,950,976.06 70.26856987 -148.22725576 9,894.00 57.23 7,015.12 -819.42 5,919.2292.90 719,280.315,950,974.19 70.26855805 -148.22657575 9,994.00 56.62 7,069.69 -824.03 6,002.8893.40 719,364.085,950,971.96 70.26854529 -148.22589926 10,094.00 55.82 7,125.29 -829.11 6,085.8593.61 719,447.145,950,969.23 70.26853123 -148.22522850 10,179.00 54.83 7,173.65 -834.05 6,155.5794.50 719,516.985,950,966.27 70.26851758 -148.22466475 10,200.00 54.72 7,185.76 -835.42 6,172.6794.65 719,534.115,950,965.39 70.26851381 -148.22452649 10,208.41 52.00 7,190.78 -835.96 6,179.4094.50 719,540.855,950,965.04 70.26851232 -148.22447211 10,276.13 48.82 7,233.93 -840.26 6,231.4094.97 719,592.955,950,962.21 70.26850045 -148.22405167 10,308.21 48.11 7,255.21 -842.37 6,255.3295.14 719,616.925,950,960.78 70.26849461 -148.22385828 10,339.88 48.05 7,276.36 -844.52 6,278.7995.32 719,640.445,950,959.30 70.26848869 -148.22366855 10,371.10 46.82 7,297.48 -846.69 6,301.6895.50 719,663.385,950,957.78 70.26848272 -148.22348348 10,434.13 43.39 7,341.96 -851.12 6,346.1095.90 719,707.915,950,954.61 70.26847052 -148.22312432 10,528.80 43.07 7,410.95 -856.43 6,410.7293.50 719,772.645,950,951.13 70.26845584 -148.22260191 10,621.79 43.18 7,478.82 -860.65 6,474.1494.10 719,836.165,950,948.71 70.26844419 -148.22208909 10,715.87 42.07 7,548.04 -864.71 6,537.7293.20 719,899.835,950,946.46 70.26843294 -148.22157505 10,809.77 41.30 7,618.16 -868.46 6,600.0593.70 719,962.245,950,944.47 70.26842253 -148.22107108 10,904.31 41.03 7,689.34 -872.86 6,662.1394.40 720,024.415,950,941.84 70.26841038 -148.22056921 10,997.64 40.72 7,759.91 -877.65 6,723.0294.60 720,085.405,950,938.77 70.26839714 -148.22007694 11,090.61 39.35 7,831.09 -882.65 6,782.6195.00 720,145.115,950,935.46 70.26838333 -148.21959513 11,185.69 38.83 7,904.88 -887.88 6,842.3395.00 720,204.955,950,931.93 70.26836891 -148.21911227 11,280.18 38.01 7,978.91 -892.94 6,900.8394.90 720,263.575,950,928.53 70.26835492 -148.21863932 12/15/2021 4:57:20PM COMPASS 5000.15 Build 90 Page 4 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1PB1Wellbore: Design:04-29AL1PB1 Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 11,374.11 36.11 8,053.87 -897.97 6,957.2195.30 720,320.075,950,925.10 70.26834105 -148.21818349 11,468.79 35.31 8,130.75 -903.08 7,012.2495.30 720,375.215,950,921.56 70.26832696 -148.21773861 11,563.07 35.42 8,207.63 -908.59 7,066.5296.30 720,429.635,950,917.58 70.26831176 -148.21729971 11,594.55 36.28 8,233.15 -910.84 7,084.8297.70 720,447.995,950,915.85 70.26830556 -148.21715178 11,626.09 36.45 8,258.54 -913.44 7,103.3498.30 720,466.575,950,913.78 70.26829841 -148.21700207 11,657.92 37.71 8,283.94 -916.25 7,122.3298.50 720,485.635,950,911.51 70.26829070 -148.21684859 11,688.98 37.94 8,308.47 -919.14 7,141.1599.00 720,504.535,950,909.15 70.26828273 -148.21669639 11,721.33 39.30 8,333.75 -922.43 7,161.0799.70 720,524.535,950,906.43 70.26827371 -148.21653534 11,751.79 39.58 8,357.27 -925.82 7,180.12100.50 720,543.675,950,903.58 70.26826439 -148.21638133 11,782.17 40.82 8,380.47 -929.38 7,199.41100.40 720,563.045,950,900.57 70.26825463 -148.21622544 11,845.04 41.78 8,427.71 -936.79 7,240.23100.20 720,604.065,950,894.32 70.26823425 -148.21589541 11,876.65 41.92 8,451.25 -940.38 7,261.0199.40 720,624.945,950,891.32 70.26822439 -148.21572741 11,908.67 41.76 8,475.11 -943.85 7,282.0999.30 720,646.105,950,888.45 70.26821486 -148.21555703 11,938.08 41.57 8,497.08 -946.98 7,301.3999.10 720,665.485,950,885.87 70.26820627 -148.21540101 11,968.93 41.46 8,520.18 -950.20 7,321.5899.00 720,685.755,950,883.23 70.26819743 -148.21523776 12,000.85 41.15 8,544.16 -953.60 7,342.3799.60 720,706.635,950,880.41 70.26818807 -148.21506967 12,059.36 42.16 8,587.87 -960.09 7,380.7299.60 720,745.145,950,875.02 70.26817025 -148.21475970 12,107.60 42.64 8,623.50 -965.85 7,412.73100.80 720,777.315,950,870.17 70.26815442 -148.21450091 12,138.54 43.32 8,646.13 -969.73 7,433.46100.40 720,798.145,950,866.88 70.26814377 -148.21433330 12,170.23 46.82 8,668.51 -973.36 7,455.6098.30 720,820.375,950,863.87 70.26813379 -148.21415437 12,201.33 51.06 8,688.93 -977.29 7,478.71100.90 720,843.585,950,860.60 70.26812300 -148.21396755 12,232.23 55.82 8,707.34 -981.58 7,503.1499.10 720,868.125,950,857.00 70.26811120 -148.21377001 12,262.56 57.64 8,723.97 -985.59 7,528.1899.10 720,893.265,950,853.70 70.26810017 -148.21356759 12,290.17 59.37 8,738.40 -989.21 7,551.4498.60 720,916.625,950,850.74 70.26809021 -148.21337954 12,326.26 60.68 8,756.43 -994.83 7,582.19102.10 720,947.515,950,845.99 70.26807477 -148.21313100 12,356.79 64.20 8,770.56 -1,000.37 7,608.68101.50 720,974.145,950,841.22 70.26805959 -148.21291686 12,388.64 68.46 8,783.34 -1,005.95 7,637.30100.60 721,002.915,950,836.44 70.26804425 -148.21268547 12,400.00 69.50 8,787.41 -1,007.90 7,647.72100.52 721,013.395,950,834.80 70.26803891 -148.21260120 12,418.95 71.24 8,793.78 -1,011.14 7,665.28100.40 721,031.025,950,832.06 70.26803001 -148.21245932 12,425.00 71.87 8,795.70 -1,012.13 7,670.9399.52 721,036.705,950,831.22 70.26802728 -148.21241362 12,449.67 74.48 8,802.84 -1,015.31 7,694.3296.00 721,060.175,950,828.71 70.26801852 -148.21222452 12,475.00 77.14 8,809.05 -1,017.62 7,718.7794.78 721,084.675,950,827.10 70.26801216 -148.21202688 12,480.93 77.76 8,810.33 -1,018.08 7,724.5494.50 721,090.455,950,826.79 70.26801086 -148.21198023 12,487.90 78.74 8,811.75 -1,018.61 7,731.3494.41 721,097.275,950,826.45 70.26800939 -148.21192523 Kick-off Point 12,488.00 78.75 8,811.77 -1,018.62 7,731.4494.41 721,097.375,950,826.45 70.26800937 -148.21192444 12,521.16 84.23 8,816.68 -1,019.96 7,764.1890.30 721,130.145,950,826.04 70.26800563 -148.21165967 12,550.96 84.76 8,819.54 -1,019.17 7,793.8386.64 721,159.755,950,827.67 70.26800771 -148.21141996 12,580.16 85.29 8,822.07 -1,016.56 7,822.8083.09 721,188.635,950,831.10 70.26801474 -148.21118572 12,610.16 87.22 8,824.03 -1,012.02 7,852.3879.46 721,218.075,950,836.47 70.26802706 -148.21094649 12,646.96 89.69 8,825.03 -1,003.91 7,888.2575.04 721,253.695,950,845.60 70.26804913 -148.21065641 12,678.96 90.57 8,824.95 -994.62 7,918.8771.20 721,284.035,950,855.76 70.26807442 -148.21040880 12,713.76 92.25 8,824.10 -982.22 7,951.3667.04 721,316.165,950,869.07 70.26810819 -148.21014594 12,741.76 92.92 8,822.83 -970.56 7,976.7863.68 721,341.245,950,881.44 70.26813997 -148.20994030 12,773.96 93.74 8,820.96 -954.88 8,004.8357.89 721,368.835,950,897.91 70.26818274 -148.20971342 12,804.76 92.95 8,819.16 -937.55 8,030.2253.49 721,393.715,950,915.95 70.26823000 -148.20950797 12,838.96 93.13 8,817.35 -916.24 8,056.8949.26 721,419.775,950,938.01 70.26828815 -148.20929210 12,867.36 93.30 8,815.76 -896.99 8,077.7145.21 721,440.035,950,957.84 70.26834067 -148.20912366 12,897.36 92.86 8,814.14 -875.30 8,098.3742.03 721,460.075,950,980.10 70.26839985 -148.20895639 12,931.16 93.74 8,812.20 -849.46 8,120.0637.98 721,481.025,951,006.55 70.26847039 -148.20878081 12,962.96 93.66 8,810.14 -823.89 8,138.8434.63 721,499.075,951,032.64 70.26854019 -148.20862869 12,993.36 92.95 8,808.39 -798.31 8,155.1630.41 721,514.655,951,058.67 70.26861003 -148.20849657 13,026.16 91.54 8,807.11 -769.43 8,170.6426.00 721,529.315,951,087.97 70.26868887 -148.20837111 13,056.16 90.75 8,806.51 -741.94 8,182.6121.07 721,540.505,951,115.79 70.26876394 -148.20827406 13,093.16 89.96 8,806.28 -706.90 8,194.4716.31 721,551.355,951,151.15 70.26885963 -148.20817791 12/15/2021 4:57:20PM COMPASS 5000.15 Build 90 Page 5 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AL1PB1Wellbore: Design:04-29AL1PB1 Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 13,122.16 91.01 8,806.03 -678.86 8,201.8413.14 721,557.925,951,179.39 70.26893621 -148.20811807 13,151.96 93.74 8,804.80 -649.65 8,207.579.08 721,562.835,951,208.75 70.26901599 -148.20807143 13,181.76 92.07 8,803.29 -620.16 8,211.506.09 721,565.925,951,238.34 70.26909656 -148.20803942 13,222.56 91.19 8,802.12 -579.47 8,214.071.15 721,567.345,951,279.08 70.26920771 -148.20801825 13,256.76 91.01 8,801.47 -545.28 8,213.66357.45 721,565.955,951,313.24 70.26930110 -148.20802132 13,293.96 90.04 8,801.13 -508.28 8,210.01351.29 721,561.265,951,350.12 70.26940220 -148.20805049 13,324.76 90.04 8,801.10 -478.05 8,204.18346.88 721,554.575,951,380.18 70.26948482 -148.20809737 13,352.76 92.16 8,800.57 -450.82 8,197.66346.18 721,547.285,951,407.21 70.26955921 -148.20814986 13,382.96 93.30 8,799.13 -421.33 8,191.36349.70 721,540.155,951,436.51 70.26963980 -148.20820055 13,411.76 93.18 8,797.50 -392.88 8,187.23353.81 721,535.225,951,464.83 70.26971754 -148.20823364 13,454.56 93.57 8,794.98 -350.39 8,182.74354.11 721,529.525,951,507.17 70.26983363 -148.20826962 13,480.56 96.39 8,792.72 -324.55 8,181.19359.04 721,527.245,951,532.96 70.26990424 -148.20828192 13,511.16 94.54 8,789.81 -294.09 8,181.341.51 721,526.525,951,563.41 70.26998745 -148.20828046 13,542.36 91.28 8,788.22 -262.95 8,182.251.86 721,526.565,951,594.56 70.27007252 -148.20827278 13,569.56 89.87 8,787.95 -235.77 8,183.392.92 721,526.925,951,621.76 70.27014675 -148.20826337 13,600.76 89.78 8,788.05 -204.68 8,185.886.26 721,528.545,951,652.91 70.27023170 -148.20824291 13,634.56 88.81 8,788.46 -171.28 8,191.0111.20 721,532.715,951,686.43 70.27032291 -148.20820115 13,662.76 89.34 8,788.92 -143.79 8,197.2514.37 721,538.175,951,714.09 70.27039801 -148.20815046 13,693.56 89.78 8,789.15 -114.22 8,205.8518.07 721,545.935,951,743.89 70.27047876 -148.20808064 13,722.36 89.16 8,789.42 -86.98 8,215.2019.83 721,554.515,951,771.38 70.27055314 -148.20800478 13,752.76 89.43 8,789.79 -58.64 8,226.1722.48 721,564.675,951,800.02 70.27063055 -148.20791583 13,779.76 91.19 8,789.65 -33.89 8,236.9524.59 721,574.745,951,825.07 70.27069813 -148.20782843 13,801.90 91.19 8,789.19 -13.76 8,246.1624.59 721,583.385,951,845.45 70.27075309 -148.20775377 Projected to TD 13,802.00 91.19 8,789.19 -13.67 8,246.2024.59 721,583.425,951,845.54 70.27075334 -148.20775344 Vertical Depth (usft) Measured Depth (usft) Casing Diameter (") Hole Diameter (")Name Casing Points 13 3/8"2,544.00 2,502.02 13-3/8 17-1/2 9 5/8"10,174.00 7,170.77 9-5/8 12-1/4 7"12,491.00 8,812.35 7 8-1/2 Measured Depth (usft) Vertical Depth (usft) +E/-W (usft) +N/-S (usft) Local Coordinates Comment Design Annotations Kick-off Point7,731.34-1,018.6112,487.90 8,811.75 Projected to TD8,246.16-13.7613,801.90 8,789.19 Approved By:Checked By:Date: 12/15/2021 4:57:20PM COMPASS 5000.15 Build 90 Page 6 STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMM ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations IZI Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change ApprtgveePrrogrsm ❑/ Plug for Redrill 0 Perforate New Pool El Repair Well 0 Re-enter Susp Well 0 Other: Block Flow Fr6rrf Lateral I! 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 200-178 3. Address: P.O.Box 196612 Anchorage, Development I3 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21453-60-00 7. Property Designation(Lease Number): ADL 0028324 8. Well Name and Number: PBU 04-29AL1 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY FIELD/PRUDHOE BAY OIL POOL 11.Present Well Condition Summary: Ckyr 13922 feet Plugs I '* Total Depth: measured measured 12425 feet ED true vertical 8787 feet Junk measured feet JUN Effective Depth: measured 12425 feet Packer measured See Attachment feet 2017 true vertical 8796 feet Packer true vertical See Attachment feet OGC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#1-1-40 31 -111 31-111 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 12236-12250 feet 12250-12260 feet 12286-12296 feet 12360-1 2363 feet 12363-12373 feet 12373-12383 feet 12383-12393 feet 12393-12403 feet 12968-13886 feet True vertical depth: 8709-8717 feet feet 8717-8723 feet 8736-8741 feet 8772-8773 feet 8773-8777 feet 8777-8781 feet 8781-8785 feet 8785-8788 feet 8810-8792 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED JUL 2 42.017 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 68 1336 6195 1780 215 Subsequent to operation: 68 1287 5853 1755 215 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 113 Exploratory ❑ Development ® Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG ❑ GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Stechauner,Bernhard Contact Name: Stechauner,Bernhard Authorized Title: FS2 Lead PE Contact Email: Bernhard.Stechauner@bp.com Authorized Signature: Date: 5/12.70 Contact Phone: +1 907 564 4594 Form 10-404 Revised 04/2017 / /'7/77 /7t -7-ill) RB D MS VV JUN 1 3 2017 Submit Original Only • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED RE: BP Exploration (Alaska), Inc. JUN 1 3 2017 Report of Sundry Well Operations Summary AOGCC June 12, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug to block the Lateral Leg from Production for Well 04-29AL1, PTD # 200-178. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • Packers and SSV's Attachment PBU 04-29AL1 SW Name Type MD TVD Depscription 04-29AL1 TBG PACKER 9833.76 6982.58 4-1/2" HES TNT Perm Packer 04-29AL1 TBG PACKER 12007.62 8549.25 4-1/2" HES TNT Perm Packer 04-29AL1 TBG PACKER 12168.62 8667.4 4-1/2" Baker S-3 Perm Packer • a) (0) to. o 0 0 0 0 0 N 0 0 0 � N- CD CD N N Lo CD O O N t O- N- r U 00M000000M0 N CA OO OD r r r65 NI- NI- co r M Nr CD CO 00 OD ODD CO 0 r O) r M I` CO C)) r r CD OD T v- OD U, OD r t 00 CO N- CD I's-- CVr N- OD OD OD 0000 CD Ci i I i I I i i F- r- r C)) O CO CD r O N- OD CD a) r CD C7) CO CO M M OD N OO O Nt CD CD N CDCO OD 03 CDM rs N OO N CA Nr CDA". N- M OO O N M CC) N7_ p r co Tr N O r N r O N O r N M N Jlllllllll I's0 O MQro CO O D O O O N 13)NMMCON006ODNNr 3.) C r r r r O m oLO p o o p 0 0 0 L- 0. LO OD C) 03O° UU Y J J co J J M CO n: U r C d *kogON *k *kJF) A8 # *k N N L CD i•-• 4 r CA r CD CD 4t c\J p oo 00 00 N N V th M LO r- - c c N N N M CD CS) M i r r N r r LM w D)o N- CO M r N- CO r N C OO L() OO co OO JN r co O r r W W 0)o Q Q cU W W W W U o u_ u_ W W W IYCLa Z Z Z Q c W W W W W W m m QDDL' F-' ZZZZDD U U) (n Z Z J J J J F- F- ' 0 • c 2 iii CV CO / C b f z _ 2 0 % o ƒ 2 $ E �/ co $ / � o To' _ co R m c8.\ 77 q •® d a/ a) 2 | 0 / k 0 k co ƒ w O 7 0_ 5 = 7 6 _ o o o e Lu &_ a~ = a) b 2 < - a . N a 2a ■ / U� oz - 7 / \ b w ' C ¥ � co 2 0 0 ai E Cu ƒ 'E.' to 88 tco k 5o0 ©Li- 0 " E m Ci. %- kE / � _, cp�Eo � � / askzLU0 / 1 m o -a 5 IRS / ccE2 0 / / % § 7 uE / / f ° / / ( E W (N % 2 ƒ � (.9 w 01.1 0 7 \ 5a LLU) 6E Ci)2 t Sc < / 0R / 3 • �CT Lu CTa « 0. a- . \ � � \ � � /_ 00Q re / w � wE0 � E : Hi; cu 13-r--- >i 2 \ 6 2 a w q p_ - E E o - 5 _ 2@ m 5 L _ _ „ 2 / , a e Lo 2 -- .- 7 / 1 / / / 20 ilia ' 0 > w > � ( cnb K0 / 4 \ IU �w ƒ 22 >- 2 & gb q_ % / 4 � \ % w \ � os -1 - ƒ ® � Ra ƒ � t / = _1 / ® � ® % WLU LUz ' • 0IIz / / $ 1-111- 01- " 1- 1-1“9_ 3 1- 0 11 w c a e & (NL ■ Q m < ic0O / $ am . - 2 (i) < w / $ t2 i 0 w O w O 2 w 0 ; G o 0 L ; W m ; O m O L ¥ N- N- 0 I- / \ 2 — n c / q _& nI-- ¥ \ \ in in « TREE= C"" i 0 4-2 9 AIIITY EL NOTE HORIZONTAL WELL ANGLE>70°@ WELLHEAD= FMC ACTUATOR= OTIS 12419'-CHROME TBG&LNR's-PREVIOUS OKB.EIEV= 60' AL 1 WELLBORE NOT SHOWN"" BF.ELEV= 13-3/8"CSG, -{ 81' I ' 4• 1818' -19-5/8"FES ES CEMENTER KOP= 1875' 68#,L-80 BTC, Max Angle= 95°@ 13612' .% 1A1.7 1840' -13-3/8"x 9-5/8"BKR ISO-ZONE ECP,D=8.70" 13=12.415" Datum MD= 12412' �! I A 2,115' -I4-1/2"HES X NPPLE,D=3.813" Datum TVD= 8800'SS F , 20"CONDUCTOR,91.5#,H-40,D=19.124" 120' GAS LFT MANDRELS 9-5/8"CSG,47#,L-80 HY D 563,D=8.681" -I 1861' ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3893 3511 52 MMG DOME RK FORT 11/25/10 9-5/8"BOWEN CSG PATCH,ID=9.610" -I 1865' 2 7317 5505 53 MMG DOME RK 22 11/25/10 1 9610 6926 56 MC SO RK 0 11/25/10 13-3/8"CSG,72#,L-80,13=12-347" - 2550' I Minimum ID =2.37" @ 12202' 8803' -{a-1r2"FES X NFft�D=3.813" 4-1/2" GS FN 9832' -9-5/8"x 4-1/2"HES TNT PKR,13=3.903" 9-5/8"X 7"TM/HLP PKR,D=6.184" -I 9977' / 9-5/8"MILLOUT WINDOW(04-29A) 10174'-10239' 9-5/8"X 7"TNV DTH HGR 13=6.113' --L 9982' / 9-5/8"CSG,47#,L-80 BTC,D=8.681" 10174' / 11977' H4-1/2"HES X NIPPLE,13=3.813" 7"LNR 29#,L-80 NSCC XO TO 13-CR NSCC H 11833' S W12006' -{7"X 4-1/2'HES TNT PKR,D=3.856' ' 12041' -I4-112"HES X NF1'! ,D=3.813" ' 12111' - I4-1/2"FES XN NIPPLE,D=3.725" 4-1/2"TBG, 12.6#, 13CR-80 VAM TOP, -I 12122' .0152 bpf,D=3.958" J 12137' 7"X 4-1/2"UNIQUE OVERSHOT 41/2"TBG STUB(05/05/10) H 12127' -1 W12168'1-H7"X 4-1/2"BKR S-3 PKR D=3.875" I TOP OF 2-7/8"LNR -I 12203' f 12203' -I3-3/4"BKR DEPLOY SLV,D=3.00" 7"MARKER JOINT -I 12220' le 12208' H 3-3/4"X 2-7/8"XO PN,ID=2.441 4-1/2"TBG,12.6#,13CR-80 NSCT, H 12254' 1 • 12241' -141/2"HES X NP,D=3.813"(BEHIND LNR) .0152 bpf,ID=3.958" \J ' 12254' --I4-1/2"WLEG(BEHIND LNR) IFLOW-THRU WHPSTOCK(11/18/00) H 12488' ml - [ 12425' I-L-718"CPP(5/13/17) ' 7"MFLOUT WINDOW(04-29AL1) 12482'- 12488' PERFORATION SUMMARY REF LOG:BHCS 12/01/95 1111. ANGLE AT TOP PERF: 56'@ 12236' Note:Refer to Production DB for historical perf data SIZE SPF ZONE INTERVAL Opn/Sqz DATE r SEE PAGE 2 FOR PERFORATION DATA L I I I I 4-9AL1 7"X 4-1/2"TM/SS PKR w/XO,D=3.923" H 12541' 13888' H FBTD I 2-7/8'LNR, -j 12968 7"LNR,29#,13-CR NSCC,.0371 bpf,D=6.184" -I 12628' I ' . I I L-80 STL,6.16#, 4-1/2"LNR, 12.6#,13-CR NSCT, .0152 bpf,D=3.958" --I 12628' -0058 bpf,ID=2.441" 04-29A 2-7/8"SLTD LNR,6-16",L-80, -I 13886' 4-1/2"SLTD LNR h•---._,1_12.6#,13CR NSCT, -I 1382T I .0058 bpf,D=2.441" .0152bpf,ID=3.958" --___._-- - 2-7/8"LNR,6.16#,L-80 STL, H 13922' [4-1/2"LNR,12.6#,13CR NSCT, .0152bpf,D=3.958" 1--I- 13870' .0058 bpf,D=2-441" LATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT • 12/14/85 PKR 191 ORIGINAL COMPLETION 12/17/12 CJWJMD SET XXN PLUG(12/11/12) WELL: 04-29AL1 04/17/86 WW1 RWO 12110/13 JTM'JMD PULLED XXN PLUG(12/06113) PERMIT No:"2001780 12/25/95 N2E5 SIDETRACK(0 -29A) 05/15/17 GJB/JMD SET CEP(05/13/17) AF1No: 50-029-21453-60 11/25/00 NOR 1 CTD SDTRACK(04-29AL1) SEC 35,T11 N,R15E,261'FNL&503'FWL 05/13/10 D141 RWO 09/29/10 FE/PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) T f • • 04-29A AL1 El , .• • I 0 g � x x I I E S I • PERFORATION SUMMARY REF LOG:BHCS 12/01/95 ANGLE AT TOP FEW: 56°@ 12236' Note:Refer to Production CB for historical perf data 1111, SIZE SPF ZONE INTERVAL Opn/Sqz SHOT SOZ 2" 6 23P 12236-12250 0 06/03/05 2" 6 12250-12260 0 05/15/05 2" 6 12286-12296 0 05/15/05 2" 6 12360-12373 0 03/01/11 2" 6 12373-12393 0 02/28/11 2" 6 12393-12403 0 02/22/11 3-3/8" 4 14P 12492-12530 0 05/16/96 4 ` Q4-29A�1 4-1/2" SLIT) " 12628-13827 SLOT 12/18/95 • I I 2-7/8" SLID " 12968-13886 SLOT 11/24/00 I I I I •,� 04-29A I I DATE REV BY CM/VENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/14/85 PKR 191 ORIGINAL COMPLETION 12/17/12 CJWJM) SET XXN PLUG(12/11/12) WELL: 04-29AL1 04/17/86 WW1 RWO 12/10/13 JTMJM) PULLED XXN PLUG(12/06/13) PERMIT No:"001780 12/25/95 N2ES SIDETRACK(04-29A) 05/15/17 GJB/JM) SET CBP(05/13/17) API No: 50-029-21453-60 11/25/00 NOR 1 CTD SDTRACK(04-29AL1) SEC 35,T11N,R15E,261'FINAL&503'FIM. 05/13/10 D141 RWO 09/29/10 FB/PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) I Project Well History File Cov~age XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. vv ,, RE§CAN DIGITAL DATA OVERSIZED (Scannable) Color items: [] Diskettes, No. [] Maps: [] Grayscale items: [] Other, No/Type ~ Other items scannable by large scanner [] Poor Quality Originals: OVERSIZED (Non-Scannable) [] Other: [] Logs of various kinds NOTES: [] Other Project Proofing BY: BEVERLY ROBIN VINCENT SHERYL~WlNDY Scanning Preparation x 30 = BY: BEVERLY ROBIN VINCENT SHERYL~INDY Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: (_(~ ( PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~._~' YES ~ NO RESCANNED BY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY General Notes or Comments about this file: DATE: IS~ Quality Checked 12/10/02Rev3NOTScanned,wpd STATE OF ALASKA - - ALASK~L AND GAS CONSERVATION COMMI~N ~~~N ~. 0 2010 REPORT OF SUNDRY WELL OPERATIONS~~~h tl€~ ~ uaa Ceuw•C~usst°1 1. Operations Performed: ^ Abandon ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ® Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: .Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 200-178 3. Address: ^ Service ^ Stratigraphic ~. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21453-60-00 7. Property Designation: 8. Well Name and Number: ~ ~ADL 028324 PBU 04-29AL1 9. Field /Pool(s): ~ Prudhoe Bay Field !Prudhoe Bay Oil Pool 10. Present well condition summary Total depth: measured 13922' feet true vertical gg5g' feet Plugs (measured) None Effective depth: measured 13922' feet Junk (measured) None true vertical 8856' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 120' 20" 120' 120' 1490 470 Surface 2550' 13-3/8" 2550' 2511' 3450 1950 Intermediate 10174' 9-5/8" 10174' 7240' 6870 4760 Production Liner 2659' 7" 9969' - 12491' 7124' - 8881' 8160 7020 Liner 1719' 2-7/8" 12203' - 13922' 8759' - 8856' 13450 13890 Perforation Depth: Measured Depth: 12236' - 13886' ~~f~~~hg'~)~~,~r ~1~1{.. ,r; ~~~~ True Vertical Depth: 8778' - 8861' Tubing (size, grade, measured and true vertical depth): 4-1/2", 12.6# 13Cr80 12254' 8788' Packers and SSSV (type, measured and true vertical depth): 9-5/8" x 4-1/2" HES 'TNT packer; 9832' 7049' 7" x 41/2" HES'TNT' packer; 12006' 8617' 7" x 4-1/2" Baker'S-3' packer 12168' 8736' 11. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Cut, pull and dress tubing to 12127. Cut, pull and dress 9-5/8" Casing to 1863'. Run 9-5/8" Tieback to 1865'. Cement w/ 135 Bbls Class'G' (Yield 1.17). Run new completion. 12. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 252 6,666 4,071 1,314 213 13. Attachments: ^ Copies of Logs and Surveys run '~• Well Class after work: ^ Exploratory ®Development ^ Service ® Dail ort of Well O erations Re y p p ® Well Schematic Diagram Well Status after work: ®Oil ^ Gas ^ WDSPL ^ GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Hank Baca, 564-5444 310-117 Printed Name Terrie Hubble Title Drilling Technologist ©~ prepared ey Name/Number. ~ Si nature Phone 564-4628 Date ((7 Terrie Hubble, 564-4628 g Form 10-404 Revised 07/2009 R~+flMS JUN 11101~~ ~!!`~/„~~ Submit Original Only 04-29A & 04-29AL1, Well History (Pre Rig Workover) Date Summary 4/16/2010 WELL S/I ON ARRIVAL. TAGGED WRP C~3 12154' SLM W/ 3.805" G-RING. DUMPED 2 BAGS OF SLUGGITS ON W RP; TOP OF SLUGGITS -12145' SLM. SET JUNK CATCHER ON SLUGGITS ~ 12142' SLM. JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED. 4/17/2010 T/I/0=1250/950/950, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS), pre RWO. PPPOT-T: Stung into test port (0+ psi), bled to 0 psi. Functioned LDS (standard), all moved freely (1.5"). Pressured void to 5000 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port (20 psi), bled to 0 psi. Functioned LDS (ET style), all moved freely (1 "). Pressured void to 3500 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. 4/17/2010 T/I/0=1300/9601960 Temp= S/I MIT-TBG PASSED to 3500 psi, MIT-IA PASSED to 1000 psi. Pumped 2.9 bbls crude down TBG to reach test pressure. TBG lost 120 psi in the 1st 15 mins and 40 psi in the 2nd 15 mins for a total loss of 160 psi during the 30 min test. Bled TBG psi (2.7 bbls, all fluid); MIT-IA to 1000 psi. Pumped 0.4 bbls crude down IA to reach test pressure. IA lost 10 psi in the 1st 15 mins and 10 psi in the 2nd 15 mins, ran test for an addtional 15 min with a 0 psi loss on the IA, monitored for additional 30 min with 0 psi loss on the IA. Bled IA psi (1.5 bbls). 4/17/2010 T/I/O = 1300/970/970. Temp = SI. TBG FL. AL spool piece is dropped. TBG FL is near surface. 4/18/2010 WELL SHUT IN ON ARRIVAL. INITIALT/I/0=700/320/200 PSI. RIH WITH 3.65" POWER CUTTER. 4/18/2010 MIT-OA PASSED to 1000 psi (RWO). MIT-OA to 1000 psi Passed on 2nd attempt. Pumped 1 bbls crude down OA to reach test pressure. OA lost 20 psi in the 1st 15 mins and 10 psi in the 2nd 15 mins for a total loss of 30 psi during the 30 min test. Bled OA psi (1 bbls) FW HPs = 700/320/80 4/18/2010 WELL SHUT IN ON ARRIVAL. INITIAL T/I/0=700/320/200 PSI. CUT 4.5" TUBING AT 12128' WITH 3.65" POWER CUTTER. 4/19/2010 T/I/0=100/100/120 Circ Out Well (RWO Prep). Pumped into Tbg w/ 5 bbl meth spear, 80 bbls 1%KCL taking returns up IA through jumper to FL. 4/19/2010 CUT 4.5" TUBING AT 12128' WITH 3.65" POWER CUTTER. RIG DOWN E-LINE. FINAL T/I/O = 400/400/200 PSI. JOB COMPLETE. 4/20/2010 T/I/0=0/0/0 Set 6-3/8" CIW "J" BPV #416 thru tree for Doyon 141 pre-rig, 1-2' ext. used, tagged C~3 102", No Problems. 4/20/2010 Circ-Out Well. Pumped a total of 1173 bbls 1%KCL down Tbg taking returns up la to FL. Freeze protected w/ 137 bbls diesel. U-Tube Diesel into IA. CMIT Tx IA to 500 psi. Passed. Lost 20 psi in first 15 minutes & 20 psi in second 15 minutes. Bleed tbg & IA pressure down to 0 psi. Freeze protect FL w/ 5 bbls neat meth & 33 bbls crude. FWHP=O/0/0. Page 1 of 1 North America -ALASKA - BP Page 1 of 2 Operation Summary Report - -- __ _ -- Common Weli Name: 04-29_DIMS AFE No Event Type: MOBILIZATION (MOB) Start Date: 4/24/2010 End Date: 4/28/2010 X4-OOPPJ-E (450,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud DatefTime: 11/13/1985 12:0O:OOAM Rig Release: 5/21/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (n) 4/24/2010 02:30 - 08:30 6.00 MOB P PRE MOVE RIG 141SUB, ROCKWASHER AND 2-PIPESHED MODULES FROM MILNE POINT CUTOFF TO DS 4. ~ 08:30 - 12:00 3.50 MOB P PRE SPOT SUB OVER WELL 04-29AL1 AND SHIM IN PLACE. 12:00 - 16:00 4.00 MOB P PRE SPOT PITS, MUD PUMP, POWER, BOILER AND TWO PIPE SHED MODULES. SPOT ROCKWASHER. 16:00 - 17:00 1.00 MOB P 'PRE HOLD APT WITH FS-2 OTL, DS-4 PAD OPS, DOYON TOOLPUSHERS AND SAFETY, ALONG WITH BP WSL'S AND BP SAFETY. 17:00 - 00:00 7.00 MOB P PRE BEGIN WORK ON REMOVING THE DEAD MAN, REPLACE THE PAD EYES, FINISH WORK ON THE MUD PUMPS, AND OTHER MISC. HOPKINS AUDIT ISSUES. 4/25/2010 00:00 - 06:00 6.00 MOB P PRE WORK ON REMOVING THE DEAD MAN ANCHOR, REMOVE THE PAD EYES, FINISH WORK ON THE MUD PUMPS, AND OTHER MISC. HOPKINS AUDIT ISSUES. 06:00 - 12:00 6.00 MOB P PRE i2EMOVE AND PREPARE THE DEAD MAN ANCHOR AND ELEVATOR BALES FOR INSPECTION. ALSO, PREPARE THE LIFTING EYES, SLIPS AND ELEVATORS FOR INSPECTION. LOAD TEST FLUID END LIFTING DEVICE IN THE PUMP ROOM AND KOOMEY ROOM. WORK ON MISC. PROJECTS ADDRESSING THE HOPKINS ~ - AUDIT. ,12:00 - 18:00 i 6.00 MOB I P PRE HAVE THE DEAD MAN ANCHOR INSPECTED, GOOD. RECEIVE AND OFF-LOAD DRILL PIPE AND MUD PRODUCTS. INSTALL DOOR CLOSURE IN PIT ROOM AND CENTRIFUGAL ROOM. REMOVE KOOMEY VALVE AND REPLACE WITH A STRAIGHT PIECE OF PIPE. CLEAN OUT THE PUMP SUCTIONS. INSTALLED ~ NEW SEAL ON DRILLERS PANEL TO FIX THE ~ , PURGE PROBLEM. REPLACED THE BRIDGE CRANE CONTROLLER. WORK ON MISC. PROJECTS ADDRESSING THE HOPKINS AUDIT. 18:00 - 00:00 6.00 MOB P PRE RE-INSTALL THE DEAD MAN ANCHOR AND PREPARE TO SLIP AND CUT DRILLING LINE. ~ CONTINUE TO REMOVE PAD EYES AROUND THE RIG. WORK ON MISC. PROJECTS ADDRESSING THE HOPKINS AUDIT. Printed 6/9/2010 11:05:33AM North America -ALASKA - BP Page 2 of 2 Operation Summary Report Common WeII Name: 04-29 DIMS AFE No Event Type: MOBILIZATION (MOB) Start Date: 4/24/2010 End Date: 4/28/2010 X4-OOPPJ-E (450,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/21/2010 Rig Contractor DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/26/2010 00:00 - 12:00 12.00 MOB P PRE REMOVE PAD EYES AROUND THE RIG. WORK ON MISC. PROJECTS ADDRESSING THE HOPKINS AUDIT. SLIP AND CUT 117' OF DRILLING LINE. SERVICE THE TOP DRIVE AND DRAW WORKS. j i CHANGE OUT THE HOPPER LINE IN THE ROCK ~ WASHER. PERFORM 4 POINT DERRICK ( INSPECTION. REMOVE DERRICK PULL OVER LINE. INSTALL DOOR SEAL ON DOG HOUSE DOOR. 12:00 - 00:00 12.00 MOB P PRE INSTALL DOOR CLOSURES ON THE DOG HOUSE TO ARCTIC ENTRY AND IN THE PITS. REMOVE BRAKE HANDLE AND-LINKAGE ASSEMBLY AND TRANSPORT TO TUBOSCOPE FOR INSPECTION. REMOVE PAD EYES. WORK ON HOPKINS AUDIT ~ ~ FINDINGS.. 4/27/2010 00:00 - 12:00 12.00 MOB P PRE ~ WORK ON HOPKINS AUDIT ISSUE AND ORGANIZE HANDLING EQUIPMENT FOR ~ UPCOMING OPERATIONS. PAINT CHICKSANS AND VALVES. CLEAN UP THE RAA/SAA/UAA AREAS AROUND THE RIG. CLEAN AROUND THE RIG IN PREPARATION FOR UPCOMING OPERATIONS. NEEDLE GUN ANY RUST AREAS AROUND THE BRAKE LINKAGE. CHANGE OUT THE HYDRAULIC OIL IN THE TOP DRIVE. MOBILIZE XT-39 HANDLING EQUIPMENT AND ELEVATOR BALES TO THE RIG FLOOR. 24-HOUR NOTICE GIVEN TO THE AOGCC AT 06:45. BOB NOBLE RETURNED THE PHONE ~ CALL AND ASKED FOR AN UPDATE AT 06:00 ON 4-28. 12:00 - 19:00 7.00 MOB P PRE RE-INSTALL THE BRAKE LINKAGE AND CONTINUE TO CLEAN AROUND THE RIG WHILE FINISHING UP ON HOPKINS AUDIT FINDINGS. BP HSE REP. ALLEN GRAFF PERFORMED AHSE / ENVIRONMENTAL RIG CONDITIONING AUDIT AND ACCEPTED DOYON 141. CONTACTED RWO SUPERINTENDENT JIM WILLINGHAM WHO GAVE ~ THE AUTHORIZATION TO PROCEED AT 19:00. Printed 6/9/2010 11:05:33AM North America -ALASKA - BP Page 1 of 21 Operation Summary Report Common Well Name: 04-29_DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig NamelNo.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase ~ Description of Operations (hr) (ft) 4/27/2010 19:00 - 00:00 5.00 WHSUR P DECOMP TAKE SEAWATER INTO THE PITS AND MOBILIZE LUBRICATOR TO THE RIG FLOOR. LOAD AND STRAP DRILLPIPE IN THE PIPESHED. INSTALL THE SECONDARY ANNULUS VALVE AND FINISH RIGGING UP THE HARDLINE. 4/28/2010 00:00 - 02:00 2.00 WHSUR P DECOMP RtG UP THE LUBRICATOR AND PRESSURE TEST TO 500 PSI. GOOD TEST. PULL THE BPV. RIG DOWN AND PREPARE TO CIRCULATE OUT THE i I WELL. _ ~ 02:00 - 03:30 1.50 WHSUR P i DECOMP REVERSE CIRCULATE OUT 55 BBLS OF DIESEL ~ FROM THE,TUBING TAKING RETURNS TO THE TIGER TANK, 3 BPM AT 200 PSI ICP AND 750 PSI I FCP. 03:30 - 06:30 3.00 WHSUR P DECOMP CIRCULATE DOWN THE TUBING AND OUT TO THE TIGER TANK ; 110 BBLS OF DIESEL AT 3 BPM WITH 150 PSI ICP AND 190 PSI FCP. LINE UP AND' BEGIN CIRCULATING TAKING RETURNS TO THE ROCKWASHER. 8.5 PPG SEAWATER IN i AND OUT. NO GAS SEEN DURING FIRST COMPLETE CIRCULATION. 1 06:30 - 07:00 0.50 WHSUR ~ P DECOMP fMC DRY ROD IN TYPE J TWC TO PREPARE FOR ~ N/D TREE. 07:00 - 08:00 1.00 WHSUR P DECOMP TEST TWC FROM BOTTOM TO 1000-psi, BUT PRESSURE BLEEDS OFF QUICKLY WHILE USING BOP TEST PUMP. R/U TO TEST FROM THE TOP. FILL TREE AND BRING PRESSURE UP TO 3500-psi AND TEST HELD SOLID FOR 10-MINUTES. R/U TO TEST FROM THE BOTTOM USING THE RIG PUMP TO FILL THE BACK SIDE; S/I RIG PUMP AND TEST HOLDS SOLID AT 1100-psi FOR 10-MINUTES. 08:00 - 08:30 0.50 WHSUR P DECOMP FMC BLEED DOWN THE SINGLE SSSV CONTROL LINE AND THE ADAPTOR SPOOL VOID. 08:30 - 09:30 1.00 WHSUR P DECOMP PJSM WITH CREW, DRILLER, AND WSL TO N/D AND UD TREE. WSL ASKED TOOLPUSHERS FOR THEIR INPUT AS TO HOW TO SAFELY N/D THE TREE AND THEY DECIDED THAT THERE WAS TOO MUCH EQUIPMENT IN THE CELLAR TO SAFELY WORK AROUND. 09:30 - 10:00 0.50 WHSUR P DECOMP SET BACK NEW TREE, ADAPTOR SPOOL, AND TUBING HEAD. MOVE CELLAR TANK TO OPPOSITE SIDE. MOVE DRAIN LINES FROM RIG I FLOOR DRAIN PAN TO CELLAR TANK. OPEN WINDWALL DOORS AND LIFT MEZZANINE ~ CATWALK TO ALLOW A PULLBACK SNUBBING LINE TO BE RUN OUTSIDE TO A TIEBACK POST. Printed 6/9/2010 11:06:18AM i North America -ALASKA - BP page 2 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud DatelTime: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To ~ Hrs Task ' Code NPT NPT Depth Phase Description of Operations (hr) , (ft) ; 10:00 - 11:30 1.50 WHSUR P DECOMP N/D TREE AT THE ADAPTOR SPOOL. USE FMC'S LIFTING CAP TO SECURE TREE TO SUPER TUGGER. R/U PULLBACK LINE TO BOTTOM OF TREE. ~ STOP AND HOLD A THAIPJSM TO DISCUSS HOW ( THE TREE NEEDED TO BE RESTRAINED AND UD ON THE RIG MATS. ALSO DISCUSS HOW i COMMUNICATIONS WOULD BE HANDLED i BETWEEN THE DRILLER LEADING THE JOB IN ~ ~ THE CELLAR AND THE TWO TUGGER OPERATORS. ~ P/U TREE AND MOVE IT OUT OF THE WAY TO ALLOW FMC TO TERMINATE THE CONTROL LINE USE PULLBACK LINEAND SUPER TUGGER LINE TO SLOWLY MOVE'THE TREE TO A POSITION NEXT TO THE .CELLAR TANK ON THE RIG MATS NEAR THE CELLAR DOOR. 11:30 - 12:00 0.50 WHSUR P DECOMP. TOUR CHANGE. DAY TOUR DRILLER, ~ ~ FLOORHANDS, AND WSL HOLD PJSM IN CELLAR TO REVIEW HOW THE TREE WOULD BE I UD AND AND REMOVED FROM THE CELLAR. 12:00 - 14:00 2.00 WHSUR P DECOMP CONTINUE TO UD AND PREPARE THE TREE FOR I REMOVAL FROM THE CELLAR. REMOVE WING ~ VALVE FROM TREE TO ENABLE IT TO PASS ~ BETWEEN THE WINDWALL DOOR AND THE CELLAR TANK. 14:00 - 17:00 3.00 BOPSUR P DECOMP PJSM TO N/U BOP STACK USING HAMMER WRENCHES. THE USE OF A RESTRAINT ON THE i HAMMER WRENCH WAS DISCUSSED BY THE DRILLER AND FLOORHANDS. ~ N/U BOP STACK. 17:00 - 19:00 2.00 BOPSUR P ~ DECOMP REMOVE HYDRIL TOP FLANGE. CLEAN SILICONE OUT OF THE STUD HOLES. INSTALL AND N/U THE DUTCH RISER SYSTEM ADAPTOR FLANGE. i-19:00 - 20:00 1.00 BOPSUR P DECOMP CLEAR AND CLEAN THE CELLAR. RE-INSTALL MODIFIED RISER AND AIR UP THE BOOTS. 20:00 - 00:00 4.00 BOPSUR P DECOMP RIG UP TO TEST THE BOPE. INSTALL THE 4" TEST JOINT, MOBILIZE THE DART VALVE, TIW VALVE, AND CROSSOVERS TO THE RIG FLOOR. PUT A BODY TEST ON THE BOP STACK. GOOD TEST. AOGCC REP. JOHN CRISP WAIVED STATES RIGHT TO WITNESS THE BOP TEST AT 23:15. Printed 6/9/2010 11:06:18AM a North America -ALASKA - BP .Page 3 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/29/2010 00:00 - 08:00 8.00 BOPSUR P DECOMP TEST BOP EQUIPMENT TO 250 PSI LOW / 3,500 ~ ~ PSI HIGH PER AOGCC REGULATIONS USING A 4" TEST JOINT. 5 MINUTES EACH TEST - 3-1/2' X 6" VBR VBR TOP RAM, CHOKE MANIFOLD VALVES 1,12,13,14 AND MANUAL KILL LINE - HCR KILL, CHOKE MANIFOLD VALVES 9, 11 - LOWER IBOP, CHOKE MANIFOLD VALVES 5,8,10 -DART VALVE, CHOKE MANIFOLD VALVES, 4, 6, 7 - TIW VALVE, CHOKE MANIFOLD VALVE 2 - HCR CHOKE AND 4" DEMCO KILL LINE VALVE - MANUAL CHOKE -ANNULAR PREVENTER -ACCUMULATOR TEST -BLIND RAMS, CHOKE MANIFOLD VALVE 3 - 3-1/2' X 6" VBR VBR TOP RAM WITH 4.5" TEST JT -UPPER IBOP FAILED TEST. TEST WITNESSED BY BP WSL CHRIS KOBUCK, i I i BP WSL MIKE ROONEY, BP WSL BILL BURSON, DOYON TP ERIC RODLAND AND DOYON j TOOLPUSHER CHARLIE HUNTINGTON. AOGCC REP. JOHN CRISP WAIVED STATES RIGHT TO WITNESS THE BOP TEST AT 23:15. 08:00 - 08:30 0.50 BOPSUR P DECOMP RIG DOWN THE TESTING EQUIPMENT. BLOW DOWN THE CHOKE, CHOKE LINE, KILL LINE, AND TOP DRIVE. 08:30 - 13:00 4.50 BOPSUR P DECOMP CHANGE OUT THE LOWER PIPE RAMS TO 4" FIXED RAMS AND THE UPPER IBOP. 13:00 - 14:30 1.50 i BOPSUR P DECOMP TEST AND CHART THE UPPER IBOP TO 250 PSI LOW / 3,500 PSI HIGH FOR 5 MINUTES. GOOD TEST. BODY TEST THE BREAK ON THE LOWER RAMS TO 250 PSI LOW / 3,500 PSI HIGH FOR 5 MINUTES CHARTED. GOOD TEST 14:30 - 16:30 2.00 BOPSUR P DECOMP PICK UP AND MAKE UP THE DUTCH RISER i ASSEMBLY AND THE DSM LUBRICATOR. TEST i THE LUBRICATOR TO 500 PSI. GOOD TEST. 16:30 - 17:30 1.00 DHB P DECOMP ATTEMPT TO PULL THE TWC 4 TIMES BUT COULD NOT GET AHOLD OF IT. SIGNS OF HAVING DEBRIS SITTING ON TOP OF THE TWC. 17:30 - 18:30 ~ 1.00 I DHB P ~ DECOMP RIG DOWN THE LUBRICATOR AND DUTCH RISER EXTENSION. 18:30 - 19:30 1.00 I DHB P DECOMP PICK UP 4" JT. OF DRILLPIPE AND CLEAN OUT ~ THE BOP STACK. PUMP 18 BBLS/MIN. AT 125 PSI. SAW MUD AND SMALL DEBRIS ACROSS THE SHAKERS. LAYDOWN THE JT. OF DRILLPIPE. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page a of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 21:00 1.50 DHB P DECOMP RIG UP DUTCH RISER EXTENSION AND DSM LUBRICATOR. TEST LUBRICATOR TO 500 PSI. GOOD TEST. PULL THE TWC . RIG DOWN THE LUBRICATOR AND DUTCH RISER EXTENSION. 21:00 - 22:00 I 1.00 PULL P DECOMP PICK UP JT. OF 4" DRILLPIPE AND MAKE UP TO 9" LH ACME CROSSOVER. SCREW INTO THE HANGER 7-1/2 TURNS. FMC BACKED OUT THE LOCK DOWN SCREWS. ~ 22:00 - 22:30 0.50 PULL P DECOMP I HOLD PJSM ABOUT PULLING HANGER. PICK UP ON THE,HANGER AND BREAK FREE AT 140K ON j THE FIRST ATTEMPT. 22:30 - 00:00 1.50 ~ PULL P DECOMP CIRCULATE SURFACE TO SURFACE (758 BBLS) STARTING AT 3 BPM WITH 100 PSI AND STAGE i UP TO 8 BPM WITH 640 PSI. SMALL AMOUNT OF I GAS BROKE OUT AT THE SURFACE AFTER ~ BOTTOMS UP. WHILE CIRCULATING MOBILIZED AND RIGGED UP CONTROL LINER SPOOLER, ~ ALONG WITH CASING TONGS AND EQUIPMENT. 4/30/2010 00:00 - 02:00 i 2.00 PULL P DECOMP , DRAIN THE STACK AND PULL THE HANGER TO I THE RIG FLOOR. TERMINATE THE CONTROL TINE. BREAK OFF THE HANGER AND PUP JTS. i BELOW IT. LAYDOWN THE LANDING JT. AND ~ CHANGE OUT THE ELEVATORS. 1 02:00 - 14:30 12.50 PULL P DECOMP PULL AND LAYING DOWN 4.5" 13CR80 NSCT COMPLETION AS FOLLOWS: - FMC TUBING HANGER i -7"NSCCPXPPUPJT. -7"NSCCBX5.5"NSCTPXO -5.5"NSCTBX4.5"TDSPXO -4.5"TDSBX4.5"NSCTPXO - 301 JTS. 4.5" 13CR80 NSCT TUBING i I ~ - 6 GLM'S - 14 4.5" 13CR80 NSCT PUP JTS. - 1 SSSV - 54 STAINLESS STEEL BANDS -CUT JT. 9.62' WITH A 4-7/8" FLARE TUBING IS IN GOOD CONDITION. MAINTAIN CONTINIOUS HOLEFILL WITH SEAWATER. HOLEFILL AT PROPER LEVELS. 14:30 - 16:00 1.50 PULL P I DECOMP RIG DOWN TUBING HANDLING EQUIPMENT AND REMOVE FROM RIG FLOOR. AT 17:15 THE DRILLER HELD A RIG EVACUATION DRILL. THIS DRILL INCLUDED THE DOYON RIG CREW AND SCHLUMBERGER E-LINE CREW. EVERYONE WENT TO THE UPWIND SAFETY AREA IN A SAFE AND EFFICIENT MANNER. DUE TO THE INCLEMENT WEATHER THEY MUSTERED AT THE VEHICLES AND DROVE I TO THE END OF THE PAD. THE EVACUATION OF THE RIG WENT VERY WELL. AFTER THE EVACUATION THE DRILLER HELD AN A.A.R. AND EVERYONE FELT THAT THE EVACUATION WENT WELL. 16:00 - 16:30 0.50 PULL P DECOMP CLEAR AND CLEAN RIG FLOOR AND PIPE SHED Printed 6/9/2010 11:06:18AM ~. North America -ALASKA - BP Page 5 of 21 Operation Summary Report ___ _ _ -- Common Well Name: 04-29_DIMS AFE No Event Type: WORKOVER (WO) Start Date:4/27!2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Oate j From - To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (ft) 16:30 - 17:00 0.50 BOPSUR P DECOMP MAKE UP 4"TEST JOINT AND FMC TEST PLUG. TEST LOWER RAMS TO 250 PSI LOW AND 3,500 ~ PSI HIGH, EACH TEST WAS HELD FOR 5 MINUTES ON THE CHART. GOOD TEST. TEST WAS WITNESSED BY BP WSL AND DOYON ~ TOOLPUSHERS. 17:00 - 00:00 ~ 7.00 EVAL P DECOMP R/U AND RUN SCHLUMBERGER E-LINE USIT LOG IN 9-5/8" CASING TO 3055'. 5/1/2010 00:00 - 01:00 1.00 ~ EVAL P DECOMP RIG DOWN SCHLUMBERGER E-LINE AND CLEAR AND CLEAN THE FLOOR. DETERMINE TOP OF i CEMENT IS AT APPROX. 1930'. CONSULTED WITH TOWN WELL ENGINEER AND DECISION WAS MADE TO CUT AT 1860'. WHILE CLEARING AND CLEANING THE FLOOR HANDS RIGGED UP OA TO THE CHOKE MANIFOLD THAT GOES TO THE TIGER TANK. 01:00 - 01:30 0.50 DHB P DECOMP RIG.UP TO RUN IN THE HOLE WITH 4"DRILLPIPE. 01:30 - 02:00 ! 0.50 DHB P DECOMP MOBILIZE HALLIBURTON 9-518" RBP AND ~ RUNNING TOOL TO THE RIG FLOOR. _ - 02:00 - 03:00 i -- 1.00 ~ DHB P DECOMP PICKUP 2 JTS. OF DRILL PIPE AND MAKE UP THE I HALLIBURTON 9-5/8" RBP AND RUNNING TOOL. 03:00 - 05:30 2.50 DHB P ~ DECOMP SINGLE IN THE HOLE ON 4" DRILLPIPE WITH THE ~ HALLIBURTON 9-5/8" RBP AND SET ON DEPTH AT 1948' CENTER OF ELEMENT AND 1944' TOP OF RBP. 05:30 - 07:00 ! 1.50 DHB P DECOMP ESTABLISH CIRCULATION TO CLEAR DRILLPIPE i AND TO WASH 9-5/8" CASING FROM 1932' TO 1970' IN PREPARATION FOR SETTING THE RBP. SLOW PUMP RATES: #1 PUMP 3-BPM AT 50-psi; #2 PUMP 3-BPM AT 50-psi. P/U WT 59-K-Lbs, S/O WT 57-K-Lbs. SET HALLIBURTON 9-5/8" RBP WITH COE AT 1948.5' AND TOP AT 1944'. RELEASE FROM RBP AND SET DOWN 15K-Lbs TO CONFIRM. PRESSURE TEST RBP TO 3500-psi FOR 10-MINUTES. POH AND SIB 2-STANDS OF DP IN DERRICK AND PREPARE TO DUMP 2200-Lbs OR 44-SACKS OF 20-40 RIVER SAND ON TOP OF HALLIBURTON 9-5/8" RBP. 07:00 - 10:00 3.00 ~ DHB P DECOMP INSTALL SAND HOPPER ON TOP OF DRILLPIPE AND DUMP 44-SACKJS OF 20-40 RIVER SAND TO PROVIDE 50' OF COVER OVER THE RBP SET i AT 1948.5'. 10:00 - 10:30 0.50 DHB P DECOMP ESTABLISH SLOW CIRCULATION OF 2-BPM TO MOVE ALL SAND OUT OF DRILLPIPE. 10:30 - 11:30 1.00 CASING P DECOMP POH AND S/B DP IN DERRICK. BREAK-OFF AND LlD THE HALLIBURTON RBP RUNNING TOOL. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 6 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (tt) 11:30 - 12:30 1.00 CLEAN P DECOMP BRING BAKER MULTI-STRING CUTTER AND OTHER BHA COMPONENTS TO RIG FLOOR AND i M/U BHA #1.8-1/4" BAKER MULTI STRING CUTTER ASSEMBLY FOR CUTTING 9-5/8" CASING. BHA = 8-1/4"MULTI STRING CUTTER, XO, 8.1/2" STABLIZER, XO. TOTAL BHA LENGTH = 13.76' 12:30 - 13:30 1.00 CLEAN P DECOMP RIH WITH CASING CUTTER ASSEMBLY ON 4" XT-39 DRILLPIPE TO 1,870'. ESTABLISH j PARAMETERS, UP WEIGHT 58K, S/O WEIGHT 60K. TAG TOP OF SAND AT 1,890'. P/U TO 1,800' it 13:30 - 14:00 0.50 CLEAN P i DECOMP PUMP AT 3 BPM AT 200 PSI TO OPEN CUTTER AND SLACK OFF TO LOCATE 9-5/8" CASING COLLARS. LOCATE 9-5/8" CASING COLLARS AT 1,810' AND 1,852'. SPACE OUT CUTTER TO CUT 9-5/8" CASINGAT 1,862'. 14:00 - 14:30 0.50 CLEAN P DECOMP HOLD PJSM WITH ALL PERSONNEL INVOLVED IN 9-5/8" CASING CUT AND ARCTIC PACK CLEAN OUT. 14:30 - 15:00 0.50 CLEAN P DECOMP CUT 9-5/8" CASING AT 1,862'. START ROTATING AT 60 RPM. BRING PUMP TO 2 BPM WITH 200 PSI. 1.5K ROTARY TORQUE. INCREASE TO 3 ~ BPM AT 250 PSI WITH 1.5K TO. INCREASE PUMP TO 4 BPM AT 400 PSI WITH 2 - 4K TORQUE. INCREASE TO 5 BPM AT 700 PSI WITH 3 - 4K TORQUE. INCREASE TO 6 BPM AND CASING CUT THROUGH. SAW 30 PSI ON 13-3/8" X 9-5/8" ANNULUS 15:00 - 16:30 1.50 CLEAN P DECOMP LINE UP AND PUMP 20 BBLS OF 120 DEGREE DIESEL DOWN DRILLPIPE TO CUTTER. CLOSE ANNULAR PREVENTER AND OPEN UP TO TANK. ~ PUMP 50 BBLS OF 120 DEGREE DIESEL DOWN 9-5/8" X 13-3/8" ANNULUS AT 2 BPM WITH 1,000 PSI DROPPING TO 800 PSI. R/D LITTLE RED. LINE UP AND PUMP 20 BBLS OF HEATED 9.8 PPG BRINE DOWN DRILLPIPE DISPLACING DIESEL FROM DRILLPIPE TO ANNULUS. LET DIESEL SOAK 16:30 - 21:30 5.00 CLEAN P DECOMP DISPLACE WITH 290 BBLS 9.8 PPG BRINE AT 2 BPM AT 350 PSI STAGING UP TO 7 BPM WTIH 2100 PSI. LINE UP AND PUMP 40 BBL SAFE-SURF-O PILL AT 5 BPM WITH 2200 PSI, CHASE WITH 600 BBLS OF SEAWATER AT 7 BBLS MIN AND 2500 PSI. AFTER THE INITIAL j I CIRCULATING WHERE LARGE AMOUNTS OF ARCTIC PACK WERE NOTICED, THERE WERE NO MORE "CHUNKS". 21:30 - 22:00 0.50 CLEAN P DECOMP MONITOR THE WELL. STATIC. 22:00 - 23:30 1.50 CLEAN P DECOMP PULL OUT OF THE HOLE WITH THE BAKER 9-5/8" CASING CUTTER BHA. 23:30 - 00:00 0.50 CLEAN P DECOMP CLEAR AND CLEAN THE RIG FLOOR OF ALL UN-NEEDED TOOLS. Printed 6/9/2010 11:06:18AM .-. North America -ALASKA - BP Page 7 of z1 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/2/2010 . 00:00 - 01:00 1.00 CLEAN P DECOMP MOBILIZE 9-5/8" SPEAR AND MISC. CASING EQUIPMENT TO THE RIG FLOOR. _ 01:00 - 02:00 1.00 CLEAN P DECOMP SPEAR INTO THE 9-5/8" CASING AND PICK UP TO i ENGAGE THE GRAPPLE. BACK OUT THE LOCK-DOWN SCREWS. PICK UP ON THE I CASING AND THE HANGER BROKE FREE AT 70K. UP WT. OF 105K ON THE CASING. 02:00 - 03:30 1.50 CLEAN P DECOMP PULL HANGER TO THE RIG FLOOR, BREAK OUT THE HANGER WITH THE RIG TONGS, LAYDOWN ~ THE HANGER AND PACKOFF ASSEMBLY. BREAK OUT AND LAY DOWN THE SPEAR. 03:30 - 06:30 3.00 CLEAN P DECOMP PJSM, PICK UP AND MAKE UP THE 9-5/8" CASING TONGS AND CASING EQUIPMENT. DUE TO THE ~ i SIZE AND BEING THE FIRST TIME USED ON THIS RIG, HAD A VERY EXTENSIVE PJSM. WHILE ~ ASSEMBLING THE TONGS, SCREW INTO THE TOP DRIVE AND BEGIN CIRCULATING. 06:30 - 07:30 1.00 CLEAN P DECOMP CIRCULATE SEAWATER DOWN CASING TAKING RETURNS TO PITS AT 11 BPM WITH 510 PSI. LIGHT ARCTIC PACK RETURNS. 07:30 - 09:30 2.00 CLEAN P DECOMP POOH LAYING DOWN 9-5/8", L-80, 47# CASING. CASING APPEARS TO BE IN GOOD CONDITION. LAY DOWN 32 JOINTS. STARTING TO GET ~ ARCTIC PACK BUILD UPON CASING. CASING ~i BROKE OUT WITH 30-40K TORQUE 09:30 - 10:00 0.50 CLEAN P ~ DECOMP CIRCULATE SEAWATER AROUND AT 8 BPM WITH 250 PSI. SLIGHT ARCTIC PACK RETURNS. 10:00 - 11:00 1.00 CLEAN ~ P DECOMP POOH LAYING DOWN 9-5/8", L-80, 47# CASING. CASING APPEARS TO BE IN GOOD CONDITION. LAY DOWN 11 JOINTS PLUS 10.7' CUT JOINT. i CASING APPEARED TO BE IN COMPRESSION WHEN CUT. RECOVERED 43 JOINTS, CUT JOINT AND 10 CENTRILIZERS. 11:00 - 12:00 1.00 CLEAN P DECOMP R/D HANDING EQUIPMENT AND CLEAR AND CLEAN RIG FLOOR. 12:00 - 15:00 3.00 CLEAN P DECOMP PICK UP AND MAKE UP 13-3/8" CASING SCRAPER / 9-5/8"DRESS OFF ASSEMBLY BHA. BHA AS FOLLOWS: - 12.125" X 9.625" 1D DRESS OFF SHOE - 11.75" WASH PIPE EXT. ~ 10" OD X 8.5" ID 9.625" CASING DRESS OFF MILL - 11.75" WASHOVER BOOT BASKET -SUB 6.625 REG PIN X PIN - 13.375" CASING SCRAPER -BIT SUB 4.5 IF X 6.625 REG - 4.5 FLOAT SUB - XO 3.5 IF BOX X 3.5 IF PIN ~ - 4.75 BUMPER SUB -XOXT39BOXX3.51FPIN ~ ~ - (8) 4.75" DRILL COLLARS Printed 6/9/2010 11:06:18AM r~ North America -ALASKA - BP Page s of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ~ Phase Description of Operations (hr) (ft) 15:00 - 16:00 1.00 CLEAN P DECOMP RUN IN THE HOLE TO 1781' AND WASH DOWN TO THE STUMP AT 1862'. ROTATE 1/4 TURN ONTO THE STUMP AND DRESS OFF TO 1863'. MILLING AT 60 RPM WITH 2-6K TW AND 250 PSI. UP WT. 65K /DOWN WT. 67K /ROT WT. 66K 16:00 - 17:30 1.50 CLEAN P DECOMP CIRCULATE SAFE-SURF-O SWEEP AT 12 BPM ~ WITH 850 PSI, WHILE ROTATING AT 60 RPM AND ' RECIPROCATING 30'. 17:30 - 20:00 2.50 CLEAN P ~ DECOMP MONITOR THE WELL FOR 10 MINUTES. STATIC. PULL OUT OF THE HOLE RACKING BACK THE 4.75" SPIRAL DRILL COLLARS AND LAYING DOWN THE DRES50FF BHA. MONITOR THE ~ WELL FOR 10 MINUTES. STATIC. 20:00 - 20:30 0.50 CASING P DECOMP PJSM FOR RUNNING 9-5/8" CASING WITH ~ DOYON RIG CREW, CASING HANDS, i ~ TOURPUSHER, BP WSL, AND OTHER THIRD PARTY SERVICE PERSONNEL. 20:30 - 22:00 1.50 CASING P TIE61 CLEAR AND CLEAN THE FLOOR OF ANY ~ UN-NEEDED TOOLS. RIG UP 9-5/8" CASING ~ 70NGS, ENSURE ALL OF THE CASING EQUIPMENT WAS FUNCTIONING CORRECTLY, AND THE TIW VALVE HAD THE CORRECT CROSSOVER ON IT. ' 22:00 - 00:00 2.00 ~ CASING P TIEB1 MAKE UP AND RUN IN THE HOLE WITH 9-5/8" CASING AS FOLLOWS: j - 9-5/8" BOWEN CASING PATCH (BAKERLOK'D) - 9-5/8" 47# L-80 BTC PUP JT. (BAKERLOK'D) ~ - 13-3/8" X 9-5/8" ECP (BAKERLOK'D) - 9-5/8" 47# L-80 BTC PUP JT. (BAKERLOK'D) - 9-5/8" 47# L-80 BTC PUP JT. (BAKERLOK'D) - 9-5/8" HALLIBURTON ES CEMENTER (BAKERLOK'D) - 9-5/8" 47# L-80 BTC PIN X HYD 563 BOX PUP JT. (BAKERLOK'D) - 23 JTS. 9-5/8" 47# L-80 HYDRIL 563 CASING ALL 23 JTS. OF CASING HAD A FREEFLOATING STRAIGHT BLADE CENTRALIZER. THE JTS. OF CASING UTILIZED JET LUBE SEAL GUARD AND - ~- WERE TORQUED TO 15,800 FT/LBS. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page s of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ~~ (ft) 5/3/2010 00:00 - 03:00 3.00 CASING P TIE61 CONTINUE TO RUN 9-5/8" 47# L-80 HYDRIL 563 CASING - 22 JTS. 9-5/8" 47# L-80 HYDRIL 563 CASING - 2 9-5/8" 47# L-80 HYDRIL 563 PUP JTS. (19.87', 9.81') - 2 JTS. 9-5/8" 47# L-80 HYDRIL 563 CASING ALl_ JTS. OF CASING HAD A FREEFLOATING STRAIGHT BLADE CENTRALIZER EXCEPT JTS 45 & 46. THE JTS. OF CASING UTILIZED JET LOBE SEAL GUARD AND WERE TORQUED TO 15,800 I FT/L68. I UP WT. 106K/,DOWN WT. 110K I i ROTATE SLOWLY OVER THE STUB. ENGAGE THECASING PATCH AT 1862'. SET DOWN 25K, THEN PICK UP 25K. SET DOWN 50K, THEN PICK UP 50K. PICK UP AT 250K TO ENSURE THE CASING PATCH IS FULLY ENGAGED. 03:00 - 06:00 3.00 CEMT P TIE61 RiG DOWN 9-5/8" CASING EQUIPMENT, CHANGE - OUT THE BALES TO LONG BALES, SPOT AND RIG UP SCHLUMBERGER, PICK UP AND LOAD ?HE CEMENT HEAD. MAKE UP THE CEMENT HEAD TO THE BTC X HYDRIL 563 XO AND TORQUE UP. RIG UP THE HARDLINE AND HOLD A PJSM WITH THE DOYON RIG CREW, TOURPUSHER, HALLIBURTON, BAKER, l ~ i CH2MHILL, SCHLUMBERGER, MI SWACO AND BP i 06:00 - 07:00 1.00 CEMT P TIE61 WSL's. TEST LINES TO 4,000 PSI, GOOD TEST. TEST i CASING TO 1,000 FOR 10 MINUTES ON THE CHART. STAGE PRESSURE UP IN 200 PSI ~ ' INCREMENTS, ECP OPENED AT 1,680 PSI AND BLED BACK TO 1,380PSI, BRING PRESSURE TO 2,100 PSI AND HOLD FOR 10 MINUTES ON THE CHART. -1/4 TO 1/3 BBL TO FILL ECP. BLEED PRESSURE TO 0 PSI, THEN BRING PUMPS ON LINE AT 2-1/2 BPM TO OPEN ES CEMENTER, ES CEMENTER SHEARED OPEN AT 2,780 PSI. 07:00 - 08:00 1.00 CEMT P TIEB1 CIRCULATE HEATED SEAWATER AROUND AT 8 BPM WITH 380 PSI UNTIL RETURNS ARE 80 DEGREES. Printed 6!9/2010 11:06:18AM r North America -ALASKA - BP Page 10 of z1 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 i End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs ~ Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:00 - 09:30 1.50 CEMT P TIE61 BATCH UP 15.8 PPG CLASS G CEMENT WITH GAS BLOC. PUMP 136 BBLS OF CEMENT STARTING PRESSURE 2-1/2 BPM AT 207 PSI AND ENDING PRESSURE 6.3 BPM AT 1,090 PSI, DROP CLOSING PLUG FOR HES ES CEMENTER, SCHLUMBERGER DISPLACED WITH SEAWATER AT 7 BPM. CAUGHT CEMENT 5-1/2 BPM AT 540 PSI, AT 120 BBLS OF DISPLACEMENT SLOW PUMP RATE TO Z3 BPM WITH 930 PSI, BUMP ~ PLUG AT 129 BBLS OF DISPLACEMENT, i PRESSURE UP TO 2,135 PS i I SAW POSITIVE INDICATION OF ES CEMENTER I CLOSING. HOLD PRESSURE FOR 5 MINUTES. BLEED OFF PRESSUREAND CHECK FOR FLOW. NO FLOW, ES CEMENTER IS HOLDING. CIP 09:17 I HOURS. APPROX. 20 BBLS OF CEMENT BACK TO SURFACE. 648 SK OF CLASS G CEMENT WITH 1.17 FT3/SK 09:30 - 10:30 1.00 CEMT P TIEB1 BLOW DOWN AND UNHOOK CIRCULATING LINES, FLUSH BOP STACK AND SIDE OUTLET VALVES, BLOW VALVES OUT. REMOVE CEMENT HEAD. 10:30 - 12:30 2.00 WHSUR' P TIE61 DRAIN BOP STACK, N/D AND RAISE BOP STACK AND EXPOSE 9-5/8" CASING 12:30 - 13:30 1.00 WHSUR- P TIEB1 INSTALL FMC 9-5/8" EMERGENCY SLIPS IN WELLHEAD AND LAND BY SETTING 100K IN i SLIPS 13:30 - 15:00 1.50 WHSUR P TIE81 MEASURE 9-5/8" CASING AND MARK WHERE TO MAKE CUT. R/U WACHS CUTTER AND CUT 9-5/8" CASING. REMOVE CUT 9-518" CASING JOINT FROM BOP STACK AND LAY DOWN IN PIPESHED. 15:00 - 15:30 0.50 WHSUR P TIE61 REMOVE BELL NIPPLE AND STANDBACK BOP STACK. 15:30 - 16:00 0.50 WHSUR P TIEB1 REMOVE LONG BAILS FROM TOP DRIVE AND INSTALL STANDARD BAILS. P/U 4" PIPE ELEVATORS AND A JOINT OF 4" DRILLPIPE. - 16:00 - 16:30 0.50 WHSUR P ~ TIEB1 M/U PACK OFF RUNNING TOOL AND FMC 9-5/8" PACK OFF AND INSTALL OVER 9-5/8" STUB. PUSH INTO PLACE. RUN IN LOCK DOWN SCREWS. 16:30 - 18:00 1.50 WHSUR P TIEB1 REMOVE OLD FMC 13-5/8" TUBING SPOOL FROM BOP STACK AND INSTALL NEW FMC 13-5/8 TUBING SPOOL. TEST 9-5/8" PACK OFF TO 3,800 PSI FOR 30 MINUTES. GOOD TEST 18:00 - 20:00 2.00 BOPSUR P TIE61 NIPPLE UP THE BOP STACK AND TEST THE BREAK TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES EACH CHARTED. GOOD TEST. 20:00 - 20:30 0.50 BOPSUR P TIE81 PICK UP THE WEAR RING RUNNING TOOL AND SET THE WEAR RING. Printed 6/9/2010 11:06:18AM r North America -ALASKA - BP Page 11 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay I Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 22:00 1.50 CLEAN P DECOMP PICK UP BAKER CEMENT CLEAN OUT BHA. ~ - 8.5" BIT - (4) 7" BOOT BASKETS ~ -BIT SUB -XO ~ - 4.75" BUMPER SUB 4.75" OIL JARS i ~ -PUMP-0UT SUB -XO ~ - (8) 4.75" DRILL COLLARS 22:00 - 23:30 1.50 CLEAN P DECOMP RUN IN THE HOLE FROM 285' TO 1700'. WASH DOWN FROM 1700 TO 1780' PUMPING AT 3 BPM WITH 50 PSI. TAGGED CEMENT AT 1780'. 23:30 - 00:00 0.50 CLEAN P DECOMP DRILL CEMENT FROM 1780' TO 1790' AT 80 RPM PUMPING AT 8 BPM WITH 545 PSI. TO 1K 5/4/2010 00:00 - 03:00 3.00 CLEAN P DECOMP DRILL CEMENT FROM 1790' TO 1821' AT 80 RPM WITH 1 K TO PUMPING AT 8 BPM WITH 575 PSI. ROTATE AND RECIPROCATE THROUGH THE AREA TO CLEAN ANY RESIDUAL CEMENT LEFT ~ I AFTER DRILLING THROUGH IT. SOFTLY TAG I TOP OF SAND AT 1890' AND PUMP AT 1 BPM i AND DRILL UP ANY DEBRIS ON THE TOP OF THE ~ i SAND. PUMP A 35 BBL HI-VIS SWEEP AT 10 i BPM WITH 880 PSI SURFACE TO SURFACE GETTING LARGE AMOUNT OF METAL SHAVINGS, PIECES OF THE PLUG, AND SAND BACK TO SURFACE. 030 0 - 04:30 1.50 CLEAN P DECOMP MONITOR THE WELL FOR 10 MINUTES. STATIC. PULL OUT OF THE HOLE AND CLEAN OUT THE BOOT BASKETS. RECOVERED APPROX. 4 GALLONS OF SAND AND SMALL PLUG PARTS. 04:30 - 07:00 2.50 CLEA N DECOMP MAKE UP RCJB BHA AND BEGIN TO RUN IN THE HOLE. ~ - 7.875 RCJB WITH 8.5" HEAD i - (4) 7" BOOT BASKETS - 9.625" CASING SCRAPER -BIT SUB -XO - 4.75" BUMPER SUB - 4.75" OIL JARS -PUMP OUT SUB -XO - (8) 4.75" DRILL COLLARS 07:00 - 08:00 1.00 ~ CLEAN P DECOMP RIH WITH RCJB ASSEMBLY TO 1,894', DROP BALL, TAG TOP OF SAND AT 1,900'. SWALLOW 3' AT 60 RPM WITH 1.5K TORQUE, 2 BPM WITH 200 PSI. INCREASE PUMP TO 7-1 /2 BPM AT 1,450 PSI AND WORK RCJB TO 1,920' 08:00 - 09:00 1.00 CLEAN P DECOMP CIRCULATE AT 20 BBL SWEEP AROUND AT 8 BPM WITH 1,500 PSI. SWEEP BROUGHT UP SAND AND SOME METAL CUTTINGS. 09:00 - 09:30 0.50 CLEAN P DECOMP pOOH FROM 1,920' TO 295', STANDING BACK 4" XT-39 DRILLPIPE IN THE DERRICK. Printed 6/9/2010 11:06:18AM ~ 1 r North America -ALASKA - BP Page 12 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11!13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:30 - 10:30 1.00 CLEAN P DECOMP STAND BACK DRILL COLLARS, BREAK OUT RCJB, NO RECOVERY IN RCJB. RECOVERED 1/2 GALLON OF SAND AND METAL CUTTINGS IN ~ JUNK BASKET. 10:30 - 11:30 1.00 CLEAN P DECOMP MAKE UP RCJB BHA AND RE-RUN ,RUN IN DRILL COLLARS FROM DERRICK TO 295' 11:30 - 12:30 1.00 CLEAN P DECOMP RIH WITH RCJB BHA ON 4" XT-39 DRILLPIPE i FROM DERRICK. TO 1,920' 12:30 - 13:00 0.50 CLEAN P DECOMP TAG SAND AT 1,922', ROTATE AT 70 RPM WITH 1 K TORQUE AND 2 BPM AT 180 PSI SWALLOW ~ ~ 5', SAW INCREASE IN TORQUE TO 2-6K THEN DROPPED BACK DOWN. INCREASED PUMP RATE TO 8 BPM WITH 1,050 PSI AND WORKED RCJB T01,933' 13:00 - 13:30 0.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 8 BPM AT 1,050 PSI, SAW SOME SAND BACK AT BOTTOMS UP. 13:30 - 14:30 1,00 CLEAN P DECOMP POOH FROM 1,933' TO 295' STANDING BACK 4" XT-39 DRILLPIPE IN THE DERRICK. 14:30 - 15:30 1.00 CLEAN ~ P DECOMP STAND BACK DRILL COLLARS IN DERRICK. ~ I BREAK RCJB, NO RECOVERY, NO RECOVERY IN ~ JUNK BASKETS. BREAK DOWN RCJB ASSEMBLY. 15:30 - 16:00 0.50 CLEAN P DECOMP CLEAR RCJB BHA FROM RIG FLOOR. 16:00 - 17:00 1.00 CLEAN P DECOMP CLOSE BLIND RAMS AND TEST 9-5/8" CASING TO 3,500 PSI FOR 30 MINUTES ON THE CHART. GOOD TEST. 17:00 - 17:30 0.50 CLEAN P DECOMP PICK UP AND MAKE UP HES 9-5/8" RBP ~ RETRIEVAL TOOL. 17:30 ' - 18:30 1.00 CLEAN P DECOMP RIH WITH 4" DP TO 1920' MD. ~ -ESTABLISH PARAMETERS OF P/U = 60K, S/O = j 62K, PUMP RATE OF 8 BPM AT 170 PSI. -WASH DOWN TO 1944' MD, TAG RBP. -STACK 15K WT AND LATCH RBP, CONFIRM LATCH WITH 15K P/U. 18:30 ' - 19:00 0.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 10 BPM, SEEING SAND ON SHAKERS. -PUMP 20 BBLS HI-VIS SWEEP FOLLOWED BY CLEAN SEAWATER SEEING SAND AT THE SHAKERS WITH THE SWEEP. 19:00 ' - 19:30 0.50 CLEAN P DECOMP RELEASE RBP WITH 1 TURN TO THE RIGHT. -RIH 10' PAST SETTING DEPTH TO CONFIRM ~ RELEASE. _ _ 19:30 - 20:00 0.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 8.5 BPM AND 270 ~ PSI. ', -10 BBLS OF DIESEUSEAWATER WAS DUMPED WHEN BOTTOMS UP WAS ACHIEVED. -CONTINUE CIRCULATING TILL CLEAN SEAWATER WAS SEEN, A TOTAL OF 244 BBLS PUMPED. 20:00 ' - 21:30 1.50 CLEAN P DECOMP FLOW CHECK WELL -STATIC. -POOH WITH RBP, RACKING BACK DP. -COMPLETE RBP WAS RECOVERED, WITH TOOLS AND UD. Printed 6/9/2010 ' 11:06:18AM North America -ALASKA - BP Page 13 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5!13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 00:00 2.50 CLEAN P DECOMP M/U DRESS OFF CASING SCRAPER BHA. ~ -6" x 4-9/16" DRESSOFF SHOE, 5-3/4" TSS EXT, I 4-3/4" x 3-7/8" TBG DRESSING MILL, 5-3/4" WASHOVER BOOT BASKET, 7" CSG SCRAPER, BIT SUB, 4-3/4"BUMPER SUB, 3-1/2" PUMP OUT ~ I SUB, XO, 4-3/4" DRILL COLLARS, 59 JTS DRILL PIPE, XO, 9-5/8" CSG SCRAPER. 5/5/2010 ~ 00:00 - 02:30 2.50 CLEAN P DECOMP RIH P/U 4" XT-39 DRILL PIPE FROM PIPESHED. 02:30 - 03:00 0.50 I CLEAN P DECOMP HOLD RIG EVAC. DRILL. ALL CREW AND SERVICE PERSONNEL WENT TO SAFE BREIFING AREA. 03:00 - 06:00 3.00 CLEAN P DECOMP RIH P/U 4" XT-39 DRILL PIPE FROM PIPESHED to 9,005' 06:00 - 09:30 3.50 CLEAN N HMAN DECOMP REVIEWED BHA AND-FOUND THERE WAS NOT ENOUGH DRILL-PIPE BELOW 9-5/8" CASING SCRAPER. POOH STANDING BACK 4" XT-39 DRILL PIPE IN DERRICK to 2,142'. "NOTIFIED AOGCC OF 24 HOUR NOTICE FOR WEEKLY BOPE TEST AT 06:30* 09:30 - 10:00 0.50 CLEAN P DECOMP P/U 3 MORE JOINTS OF 4" XT-39 DRILL PIPE THEN PICK 9-5/8" SCRAPER BACK UP. BHA = 2,236.45' 10:00 - 12:00 2.00 CLEAN P DECOMP RIH WITH DRESS OFF BHA ON 4" XT-39 DRILL PIPE FROM 2,236' TO 8,252' 12:00 - 15:00 3.00 CLEAN P DECOMP CONTINUE TO RIH FROM 8,252' TO 12,126' WHERE TAG UP WAS MADE. -ESTABLISH PARAMETERS OF 210 UP, 120 DOWN AND 160 ROT. @ 60 RPM AND 9K FREE TO. 6 BPM AT 950 PSI. -7" LINER TOP AT 9958' MD. HAD TO WORK THROUGH TOP OF 7" LINER. HAD TO TURN STRING TO GET ASSEMBLY TO FALL THROUGH. 15:00 - 15:30 0.50 CLEAN P DECOMP SWALLOW 15' OF TUBING STUB AND DRESS OFF 4.5"TUBING STUB AT 60 RPM AND 10K TO. -6 BPM AND 990 PSI. TOP OF TUBING STUB AT 12,127'. -WORK SCRAPER ACROSS PACKER SETTING DEPTHS OF 9850' AND 12,030' 4 TIMES EACH. -ENSURE STUB COULD BE CLEARED WITH NO I ROTATION. _ 15:30 - 17:00 1.50 ~ CLEAN P DECOMP CIRCULATED HI-VIS SWEEP AROUND AT 10.5 BPM AND 2700 PSI. -NOTHING NOTED ACROSS SHAKERS. A TOTAL OF 610 BBLS PUMPED. _ 17:00 - 21:30 4.50 CLEAN P DECOMP FLOW CHECK WELL -STATIC. -POOH TO 2236'. -FLOW CHECK WELL -STATIC. 21:30 - 22:00 0.50 CLEAN P DECOMP L/D 9-5/8" SCRAPER AND CLEAR RIG FLOOR OF XO. 22:00 - 22:30 0.50 CLEAN P DECOMP POOH WITH DP IN BHA AND RACK BACK IN DERRICK. Printed 6/9/2010 11:06:18AM North America- ALASKA - BP Page 1a of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5!13/2010 Rig Contractor. DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 CLEAN P DECOMP UD BHA AND 7" SCRAPER. ~ -UD DRILL COLLARS, XO, TSS EXT, AND SHOE. ~ -GOOD INDICATIONS ON MILL OF DRESSING OFF ~ ~ 4-1 /2" TBG. 5/6/2010 00:00 - 01:30 1.50 CLEAN P DECOMP PJSM FOR UD BHA. -CONTINUE TO UD 4-1/2" DRESS OFF BHA. -CLEAN AND CLEAR RIG FLOOR. 01:30 - 02:00 0.50 CLEAN P DECOMP P/U HES 9-5/8" RTTS WITH XO. ~ 02:00 - 06:00 4.00 CLEAN P DECOMP RIH WITH DRILL PIPE FROM DERRICK. -RIH TO -7,000'. 06:00 - 07:00 1.00 CLEAN P DECOMP RIH WITH HES 9-5/8" RTTS ON 4" XT-39 DRILLPIPE FROM DERRICK. -RIH FROM 7,000' TO 9,902' -CALLED AOGCC AT 06:22 HRS AND LEFT A UPDATE ON UPCOMING BOP TEST. 07:00 - 08:00 1.00 CLEAN P DECOMP ESTABLISH PARAMENTERS, UP 165K, S/O 108K. ~ SET HES 9-5/8" RTTS AT 9,902'. MAKE 3 TURNS i TO THE RIGHT AND LET TORQUE OUT, 2 TURNS ~ BACK. SLACK OFF AND SET 15K DOWN ON ~ RTTS. R/U TO TEST 9-5/8" CASING FROM 9,902 I TO SURFACE. TEST TO 3,500 PSI FOR 30 MINUTES ON THE CHART. GOOD TEST. BLEED OFF PRESSURE. 08:00 - 08:30 0.50 CLEAN. P i DECOMP UNSEAT HES 9-5/8" RTTS, LET ELEMENTS 1 i ~ REUaX FOR 10 MINUTES, SLACK OFF BELOW 9,902' TO ENSURE RTTS RELEASED. UP WEIGHT 165K, S/O WEIGHT 108K. OBSERVE WELL, WELL STATIC. UD ONE JOINT OF 4" XT-39 DRILLPIPE. 08:30 - 10:00 1.50 ~ CLEAN P DECOMP SLIP AND CUT 123' OF DRILLING LINE. INSPECT i DRAW WORKS AND DRUM BRAKES. 10:00 - 13:00 3.00 CLEAN P DECOMP POOH STANDING BACK 4" XT-39 DRILLPIPE IN DERRICK FROM 9,870' 13:00 - 14:00 1.00 CLEAN P DECOMP BREAK OUT AND LAY DOWN HES 9-5/8" RTTS. -REMOVE RTTS FROM RIG FLOOR. -CALLED AOGCC @1400 HRS AND LEFT A UPDATE ON UPCOMING BOP TEST. NO ANSWER. 14:00 - 15:00 1.00 BOPSUR P DECOMP M/U FMC RUNNING TOOL AND PULL 8-3/4" ID WEAR BUSHING. ~ -@ 1430 HRS CALLED DAVE BJORK WHO NOTIFIED AOGCC AND SPOKE WITH GUY SWARTZ OF UPCOMING BOP TEST. HE MENTIONED TO ATTEMPT TO CALL THE SLOPE OFFICE ONE MORE TIME AND IF NO ANSWER ' TEST WITNESS WOULD BE WAIVED. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 15 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor. DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 21:00 6.00 BOPSUR P DECOMP TEST BOP EQUIPMENT TO 250 PSI LOW / 3,500 PSI HIGH PER AOGCC REGULATIONS USING A 4"TEST JOINT. ~ ; 5 MINUTES EACH TEST I i - 3-1/2' X 6" VBR TOP RAM, CHOKE MANIFOLD VALVES 1,12,13,14 AND MANUAL KILL LINE - HCR KILL, CHOKE MANIFOLD VALVES 9, 11 LOWER IBOP, CHOKE MANIFOLD VALVES 5,8,10 -DART VALVE, CHOKE MANIFOLD VALVES, 4, 6, 7 - TIW VALVE, CHOKE MANIFOLD VALVE 2 -HCR CHOKE'AND 4" DEMCO KILL LINE VALVE - MANUAL CHOKE -ANNULAR PREVENTER -ACCUMULATOR TEST -BLIND RAMS, CHOKE MANIFOLD VALVE 3 ~ - 3-1/2' X 6" VBR VBR TOP RAM WITH 4.5" TEST JT ~ -ALL GOOD TESTS. TEST WITNESSED BY BP WSL BILLY BURSON, BP WSL JOHN WILLOUGHBY, DOYON TP ERIC RODLAND AND DOYON TOOLPUSHER VICTOR ~ TORRES. AOGCC REP. GUY SWARTZ WAIVED STATES RIGHT TO WITNESS THE BOP TEST AT 15:00 HRS. 21:00 - 22:30 i 1.50 ~ BOPSUR P DECOMP RIG DOWN BOPE TEST EQUIPMENT. I -ATTEMPT TO PULL TEST PLUG OUT AND PLUG GOT BOUND UP WITH PART OF THE ANNULAR PREVENTER THAT WAS PROTRUDING. -DECISION WAS MADE TO CHANGE THE ANNULAR PREVENTER. -THE TEST PLUG WAS SET BACK INTO PLACE. -TOWN ENGINEER WAS NOTIFIED AND DISCUSSION OF BARRIERS WAS DETERMINED TO BE THE WRP AND THE BLIND RAMS AFTER RETESTING. -PRESSURE TEST THE BLINDS FROM BELOW TO 1000 PSI FOR 10 MIN. GOOD TEST. 22:30 - 00:00 1.50 BOPSUR N RREP i DECOMP RIG DOWN DUTCH RISER SYSTEM AND GATHER EQUIPMENT TO REPLACE THE ANNULAR PREVENTER ELEMENT. -PERFORM HAZARDOUS ASSEMENTS. 5/7/2010 00:00 - 06:00 6.00 BOPSUR N RREP DECOMP PJSM -CHANGE ANNULAR PREVENTER ELEMENT. -R/U EQUIPMENT. -REPLACE THE ANNULAR PREVENTER ELEMENT. -N/U ALL EQUIPMENT. -RETEST ANNULAR PREVENTER TO 250 PSI LOW AND 3500 PSI HIGH WITH 4" TEST JOINT. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 1s of 21 Operation Summary Report __ _ _ ___ __ _ ____ _ AFE No Common Well Name: 04-29_DIMS Event Type: WORKOVER (WO) Start Date:4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date(fime: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 07:30 1.50 BOPSUR P DECOMP RIG DOWN BOPE TEST EQUIPMENT. PULL AND LAY DOWN TEST PLUG. INSTALL WEAR BUSHING. 07:30 - 08:00 0.50 FISH P DECOMP RIG UP 2-7/8" PAC DP HANDLING TOOLS. 08:00 - 10:00 2.00 FISH P DECOMP pUMU FISHING BHA #8 TO FISH JUNK CATCHER AS FOLLOWS: -3-1/2" ITCO SPEAR W/3.00" GRAPPLE -2-3/8" SPEAR EXTENSION -2-318" SPEAR STOP SUB -XO ~ -XO -3 JTS. 2-7/8" FOX TUBING -XO -XO 10:00 - 16:00 6.00 FISH P DECOMP RIH WITH BHA #8 ON 4" XT-39 DP. 16:00 - 20:00 4.00 FISH P DECOMP CIRCULATE AND SWAP WELL TO CLEAN SEAWATER AT 8.0-BPM AT 1660-PSI. 20:00 - 21:00 1.00 FISH P DECOMP ESTABLISH FISHING PARAMETERS: I -PUW = 200K, SOW = 125K, PUMP ON @ 2.0-BPM @ 380-PSI. -SET DOWN ON FISH AT 12155' AND SEE SHEAR SCREWS SHEAR WITH SK DOWNWEIGHT. SET ADDITIONAL 10K. PUMP PRESSURE INCREASED TO 1080-PSI. PUMP OFF AND PRESSURE DECREASED TO 900-PSI. BLED OFF PRESSURE TO 0-PSI. PICKED UP 13' WITH 8-10K OVERPULL. PUMP ON AT 2.0-BPM AT 480-PSI. RIH AND TAG FISH AT 12155'. PRESSURE INCREASED TO 1080-PSI WITH 10K DOWNWEIGHT. PUMP OFF i AND BLED PRESSURE TO 0-PSI. SET ADDITIONAL 15K DOWNWEIGHT ON FISH. POH WITH 45K OVERPULL. CONTINUE POH WITH UPWEIGHT FLUCTUATING FROM 5K TO 40K. POH AND STAND BACK STAND. DRAGGING STOPPED AND MADE DECISION TO POH. BLEW DOWN TOP DRIVE. MONITORED WELL FOR ~ FLOW. NO FLOW. 21:00 - 00:00 3.00 FISH P DECOMP pOH WITH FISH STANDING 4" DP IN DERRICK. -CONDUCTED KICK WHILE TRIPPING DRILL. AAR HELD TO RECOGNIZE AND LEARN FROM DRILL RESULTS. 5/8/2010 00:00 - 01:30 1.50 FISH N DPRB DECOMP CONTINUE POH WITH FISH STANDING 4" DP IN ~ DERRICK. 01:30 - 02:00 0.50 FISH P DECOMP CONDUCT RIG EVACUATION DRILL AND AFTER ACTION REVIEW. 02:00 - 06:00 4.00 FISH N DPRB DECOMP CONTINUE POH WITH FISH STANDING 4" DP IN DERRICK. NO FISH, GRAPPLE WAS IN RELEASE POSITION. PIN WAS STILL IN PLACE. PINS ON BOTTOM OF SPEAR WERE GONE. 06:00 - 07:00 1.00 FISH N DPRB DECOMP ADD EXTENSION TO SPEAR, CHANGEOUT GRAPPLE. CATCH RANGE ON GRAPPLE 2.994" _~ ~TO 3.001" TAPE GRAPPLE IN POSITION. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 17 of 21 Operation Summary Report Common Well Name: 04-29_DIMS AFE No Event Type: WORKOVER (WO) ,Start Date: 4/27/2010 ~ End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 'Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 12:00 5.00 FISH P DECOMP RIH WITH JUNK CATCHER BHA ON 4" XT-39 DRILLPIPE FROM DERRICK. RIH TO 8,756' 12:00 - 12:30 0.50 FISH P DECOMP CREW CHANGE, SERVICE RIG, SET AND TEST ~ ALARMS. 12:30 - 13:30 1.00 FISH I P DECOMP RIH WITH JUNK CATCHER BHA ON 4" XT-39 DRILLPIPE FROM DERRICK. RIH TO 12144'. PUW = 200K, SOW = 125K. 13:30 - 16:00 2.50 FISH P DECOMP WASH TO 12173', ICP @ 4.0-BPM @ 1650-PSI. SLOWED PUMP TO 2.0-BPM @ 920-PSI. WORKED SPEAR INTO JUNK CATCHER WITH A i PRESSURE INCREASE TO -1200-PSI. PULLED JUNK CATCHER TO 12050' WITH 40-45K OVERPULL WHILE CONTINUING TO PUMP AT 2.0-BPM AT -1000-PSI. FISH DRAGGING -40K TO TOP OF 4-1/2" TUBING STUB AT 12027 ~ WHERE DRAGGING CEASED. 16:00 - 16:30 0.50 FISH P DECOMP MIXED ANO PUMPED 20-BBLS. 9.1-PPG BRINE SLUG. BLEW DOWN TOP DRIVE. 16:30 - 23:00 6.50 FISH P DECOMP PJSM AND HAZARD RECOGNITION. POH WITH FISH. PIPE PULLING DRY. RECOVERED JUNK CATCHER ON SPEAR. BROKE OUT AND LAYED DOWN SPEAR AND JUNK CATCHER. UNABLE TO RELEASE SPEAR FROM JUNK CATCHER. LARGE BULGE ON JUNK CATCHER APPROX. 6' FROM TOP. 23:00 - 00:00 1.00 FISH P DECOMP pUMU WRP OVERSHOT BHA #10 AS FOLLOWS: -WEATHERFORD WRP RETRIEVAL TOOL ~ -XO -3 JTS. 2-7/8" FOX TUBING -XO -XO 5/9/2010 00:00 - 06:00 ~ 6.00 FISH P DECOMP RIH WITH WRP RETRIEVAL BHA #10 ON 4" XT-39 DP FROM DERRICK. 06:00 - 07:00 1.00 FISH P DECOMP RIG UP TO REVERSE CIRCULATE, TO CLEAN SLUGGITS OFF OF WRP 07:00 - 09:00 2.00 FISH P DECOMP REVERSE CIRCULATE AT 6 BPM WITH 700 PSI. TAKING 10 - 15K TO SLIDE THROUGH CLOSED i ~ ANNULAR. TAGGED SLUGGITS AT 12,172'. REVERSE DOWN TO 12,187' LATCHED ONTO WRP AND OPENED EQUALIZER PORT. WELL WENT ON A VAC. SET 15K DOWN ON WRP. PICK UP AND WRP RELEASED AT 15K OVER PULL. SLACK OFF TO 12,197' TO ENSURE WRP IS RELEASED. PUMP DOWN KILL LINE AT 12 BPM CAUGHT FLUID. FILLED HOLE. BULLHEAD 22 BBLS OF SEAWATER AT 4-5 BPM, ICP 120 PSI, FCP 30 PSI. OPEN ANNULAR AND ESTABLISH LOSS RATE OF 230 BPH. 09:00 - 09:30 0.50 FISH P DECOMP BLOW DOWN AND RIG DOWN CIRCULATING LINES. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 1s of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27!2010 ~ End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay ~ Site: PB DS 04 Rig Name/No.: DOYON 141 ~ Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor DOYON DRILLING INC. UWI: _ Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date ~ From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) ' 09:30 - 00:00 14.50 FISH P DECOMP POOH LAYING DOWN 4" XT-39 DRILLPIPE DOWN ~ THROUGH PIPESHED. FILLING HOLE AT 60 BPH PLUS PIPE DISPLACEMENT WITH SEAWATER. PIPE STARTED PULLING WET AT 3000' DP LEFT ~ IN HOLE. 5/10!2010 ~ 00:00 - 00:30 0.50 FISH P DECOMP CONTINUED AND COMPLETED POH LDDP THROUGH PIPE SHED. 00:30 - 01:30 1.00 FISH P DECOMP BREAK OUT AND LAY DOWN 3-JTS. 2-7/8" FOX ' TUBING, WRP RETRIEVAL O/S AND 4-1/2"WRP. ~ 01:30 - 02:30 1.00 FISH P DECOMP CLEAR AND CLEAN RIG FLOOR. 02:30 - 03:00 0.50 RUNCOM P RUNCMP PJSM -REVIEWED RIGGING UP TO RUN 4-1/2" 13CR80 PROCEDURE AND PLAN. 03:00 - 05:00 2.00 RUNCOM P RUNCMP RIG UP DOUBLE STACK TONGS, SINGLE JOINT ~ COMPENSATOR, SINGLE JOINT ELEVATORS, TORQUE TURN EQUIPMENT. SWAPPED OUT SHORT BAILS TO LONG BAILS AND PICKED UP 4-1/2" MYC ELEVATORS. PLACED COMPLETION JEWELRY IN ORDER OF RUN IN PIPE SHED. 05:00 - 05:30 0.50 RUNCOM P RUNCMP AAR -REVIEW CHROME TUBING RUNNING ;PROCEDURE. 05:30 - 00:00 18.50 RUNCOM i P RUNCMP pJSM. RIH GAS LIFT COMPLETION ON 4-1 /2" ~ 13CR80 CHROME TUBING PER RUNNING ORDER. WSI, DRILLER AND HES REP. VISUALLY VERIFIED PLACEMENT OF RHC-M PLUG BODY AND ALL OTHER COMPLETION JEWELRY. PICKED UP EACH JOINT AND STABBED CONNECTIONS WITH SINGLE JOINT COMPENSATOR AND HAND STARTED EACH CONNECTION BEFORE APPLYING HYDRAULIC TONGS TO MAKE UP CONNECTION. MADE UP ALL CONNECTIONS TO 4440-FT. LBS. TORQUE AND CHARTED MAKEUP TORQUE TURN DATA. USED NEW CAN OF JET LOBE SEAL-GUARD ~ THREAD COMPOUND. 5/11/2010 00:00 - 01:00 1.00 RUNCMM P RUNCMP CONTINUE RIH WITH 4-1/2" 13RC80 ~ COMPLETION. 01:00 - 02:00 1.00 RUNCOM P RUNCMP SPACEOUT UNIQUE OVERSHOT OVER 4-1/2" TUBING STUB. -TAGGED 4-1/2" TUBING STUB AT 2' IN ON JT. #299 OR 12131'. P/U WT. = 181 K, S/O WT. _ 87K. -ATTEMPT TO SWALLOW 4-1/2" TUBING STUB WITH OVERSHOT WITH 20K DOWNWEIGHT. NO JOY. ATTEMPT TO TURN TUBING WITH RIG TONGS AND ROTARY TABLE. UNABLE TO TURN TUBING. -LAY DOWN JT. #299. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 19 of 21 Operation Summary Report Common Well Name: 04-29 DIMS ~ AFE No Event Type: WORKOVER (WO) Start Date: 4/2 712 01 0 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 ~ Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 04:30 2.50 RUNCMM P RUNCMP LAY DOWN JT. #299. RIG DOWN SINGLE JOINT COMPENSATOR. MAKEUP XO AND 4° XT39 TIW VALVE TO TOP OF JT. #299. PUMU JT. #299 TO TUBING STRING AND MAKEUP TO TOP DRIVE. SET TOP DRIVE TORQUE LIMIT AT 5K FT-LBS. (MAX. MAKEUP TORQUE ON 4-1/2"TUBING = 4880 FT-LBS.) TURN STRING 180 DEGREES TO ORIENT OVERSHOT AND ATTEMPT TO SWALLOW 4-1/2" TUBING STUB WITH 20K DOWNWEIGHT AND NO JOY. TURN TUBING STRING ADDITIONAL 90 DEGREES AND ATTEMPT TO SWALLOW TUBING STUB WITH 20K DOWNWEIGHT AND NO JOY. TURN TUBING TO 90 DEGREES FROM ORIGINAL ORIENTATION AND APPLY 20K DOWNWEIGHT WITH NO JOY. COMMENCE PUMPING AT 2.0-BPM AT 40-PSI AND STAGE'PUMP UP TO 5.0-BPM AND AFTER CATCHING FLUID AT 20-BBLS. AWAY, PRESSURE INCREASED TO 240-PSI. WASHED DOWN 3-4' OVER STUB WITH 2-4 RPM AND 5K FT-LBS TORQUE AND FROM 5-15K DOWN i WEIGHT. AT 4' OF SWALLOW, COULD WASH NO DEEPER AND SET DOWN WITH 25K DOWNWEIGHT. PULLED OFF TUBING STUB WITH 200K P/U WT. 04:30 - 08:30 4.00 RUNCOM N 'DPRB RUNCMP TALKED OVER PLAN FORWARD WITH DAY WSL AND AGREED MIXING AND PUMPING I 60-BBL. SAFE-CUBE PILL WITH 2 DRUMS SAFE-CUBE TO REDUCE TUBING DRAG. WAIT ON SAFE-CUBE TO ARRIVE FROM M-I. 08:30 - 09:30 1.00 RUNCOM N DPRB RUNCMP RIG DOWN COMPLETION HANDLING EQUIPMENT. RIG UP TO PUMP SAFELUBE DOWN BACKSIDE. 09:30 - 12:30 3.00 RUNCOM N DPRB RUNCMP PUMP 100 BBLS SEWATER WITH 2 DRUMS SAFELUBE DOWN BACKSIDE. CHASE WITH 400 BBLS SEAWATER. SHUT DOWN. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 20 of 21 Operation Summary Report _- _ _ __ __ Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) I Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 14:00 1.50 RUNCOM N DPRB RUNCMP I RIG UP TO RUN COMPLETION. WORK PIPE DOWN, TAG UP WITH 4FT OF SWALLOW, SET DOWN 30K, NO GO. SCREW IN TOP DRIVE. ROTATE 1/2 TURN TO THE RIGHT AND SET DOWN AGAIN, NO GO. ROTATE 1/4 TURN SET DOWN TWICE AND MAKE PROGRESS ON SECOND ATTEMPT, SETTING DOWN 25K EACH TIME. WORK DOWN TO 8 FT SWALLOW WITH SUCCESSIVE 1/4 TURNS. UP WEIGHT 168K, i j , DOWN WEIGHT 103K. WORK PIPE SEVERAL TIMES WITH NO ROTATION TO 12 FT SWALLOW. OBSERVE 10K DROP IN DOWN WEIGHT FROM 25K TO 15K INDICATING SECOND SET OF SHEAR PINS. CONTINUE TO WORK DOWN TO 14.5 FT SWALLOW, TAGGING NO GO. VERIFY WITH 3 MORE PASSES TAKING 25K DOWN WEIGHT AT ~ ' SAME DEPTH. KICK ON PUMPS AT 2 BPM WITH 40 PSI, WORK OVER TOP OF STUMP WITH NO PRESSURE INCREASE. INCREASE PUMP RATE TO i 3 BPM WITH 40 PSI. WORK DOWN AND SEE PRESSURE INCREASE TO 70 PSI WITH 10 FT OF SWALLOW. PULL OFF OF STUMP AND SEE ~ i ~ PRESSURE DROP OFF TO 40 AT 4FT ~ SWALLOW. 14:00 - 17:00 3.00 RUNCMM N ' DPRB RUNCMP SPACE OUT FOR LANDING HANGER. PULL i JOINTS, MAKE UP PUPS AND RUN JOINT BACK ~ IN. LAND HANGER ON LANDING JOINT. RILDS - j 17:00 - 19:00 2.00 RUNCOM N DPRB , RUNCMP RIG DOWN TUBULAR HANDLING EQUIPMENT. CLEAR AND CLEAN FLOOR. 19:00 - 00:00 5.00 RUNCOM N DPRB RUNCMP MIRU SLICKLINE UNIT. -PJSM. REVIEW RIGGING UP SLICKLINE PROCEDURE. -PUMU DUTCH LUBRICATOR LOCKDOWN MANDREL. -PUMU SLICKLINE LUBRICATOR, PUMP-IN SUB AND WIRELINE BOPE. j -PRESSURE TEST LUBRICATOR TO 500-PSI AGAINST BLIND RAMS. FAILED TEST. -BROKE OFF LUBRICATOR LOCKDOWN MANDREL AND CHECKED CLEANED AND LUBRICATED 9-5/8" ACME CONNECTION IN DUTCH RISER SYSTEM. -STABBED LOCKDOWN MANDREL AND RILDS. -FILLED LUBRICATOR WITH WATER AND PRESSURE TESTED LUBRICATOR TO 500-PSI. GOOD TEST. 5/12/2010 00:00 - 08:00 8.00 RUNCMM N DPRB RUNCMP RIH WITH SLICKLINE TOOL STRING AND RETRIEVE RHC-M PLUG BODY. RIH WITH SLICKLINE TOOL STRING WITH 3.65" O.D. DRIFT TO 12203'. RIH AND SET NEW RHC-M PLUG BODY AT 12111'. 08:00 - 10:00 2.00 RUNCMM P RUNCMP RIG DOWN SLICKLINE UNIT. CLEAR AND CLEAN FLOOR. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 21 of 21 Operation Summary Report - Common Well Name: 04-29 DIMS ~ AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 (End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Dateffime: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 13:30 3.50 RUNCMM P RUNCMP PUMP 570 BBLS INHIBITED SEAWATER AT 3 BPM ~ WITH 300 PSI. 13:30 - 16:00 2.50 RUNCOM P RUNCMP DROP BALL AND ROD. PRESSURE UP TO 3500 PSI. SET PACKERS. CONTINUE TO HOLD 3500 PSI AND TEST TUBING FOR 30 CHARTED i MINUTES. BLEED TUBING PRESSURE TO 1600 ! PSI. PRESSURE ANNULUS TO 3500 PSI AND TEST FOR 30 CHARTED MINUTES. BOTH TEST FLAT LINE. BLEED OF TUBING PRESSURE, OBSERVE SHEAR WITH 1600 PSI ON TUBING. RIG UP AND PUMP DOWN ANNULUS AT 2 BPM WITH 80 PSI, VERIFY RETURNS. PUMP DOWN TUBING AT 2 f3PMWITH 9Q PSI, VERIFY ~ RETURNS. SHEAR VALVE CLEAR. 16:00 - 17:00 1.00 RUNCMM P RUNCMP SET TWC. TEST FROM BELOW TO 1000 PSI FOR 10 MINUTES AND 3500 PSI FROM ABOVE FOR 10 MINUTES: BOTH TESTS OK. 17:00 - 19:30 2.50 RUNCOM P RUNCMP BLOW DOWN LINES AND DRAIN BOP STACK. i OBSERVED TWC LEAKING VERY SLIGHTLY ~ INTO BOP STACK. PRESSURED I/A UP TO 300.PSI AND SHUT SAME IN TO TRAP PRESSURE AND HOLD TWC POPPET CLOSED. TWC STOPPED LEAKING. 19:30 - 21:00 1.50 BOPSUR P RUNCMP PJSM. NIPPLE DOWN BOPE. 21:00 - 00:00 ~ 3.00 BOPSUR P RUNCMP NU 4-1/8" 5M CAMERON PRODUCTION TREE AND ! 13-5/8" 5M ADAPTER FLANGE. TESTED HANGER VOID TO 5000-PSI O.K. 5/13/2010 ~ 00:00 - 01:00 1.00 RUNCOM P RUNCMP PJSM. PRESSURE TESTED PRODUCTION TREE TO 5000-PSI FOR 10-MINUTES. GOOD TEST. 01:00 - 03:00 2.00 RUNCOM P RUNCMP PUMU VALVE SHOP LUBRICATOR TO SWAB VALVE. PRESSURE TESTED LUBRICATOR TO 500-PSI. PULLED TWC. LAYED LUBRICATOR DOWN. ! 03:00 - 04:30 1.50 RUNCOM P RUNCMP REVERSE CIRCULATE 150-BBLS. 70F DIESEL AT 2.0-BPM TO FREEZE PROTECT TUBING AND I/A i ~ TAKING RETURNS TO ROCK WASHER. _ 04:30 - 06:00 1.50 RUNCMM P , RUNCMP U-TUBE DIESEL FROM I/A TO TUBING. 06:00 - 09:00 3.00 ! RUNCMM P RUNCMP RIG DOWN LRS. SECURE TREE. INTALL VALVES AND GAUGES. RELEASE RIG AT 09:00 HOURS. Printed 6/9/2010 11:06:18AM TD FF = (M/ WELLHEAD= FMC ACTUATOR = OTIS KB. ELEV = 60' BF. ELEV = KOP = 1875' Max An le = 98° 13900' Datum MD = 12412' Datum ND = 8800' SS L~ ~~ RAF 1 9-5/8" CSG PATCH , 47#, L-80, ID=8.681" i--i 1865' 13-3/8" CSG, 72#, L-80, ID = 12.347" ~ 2550 Minimum ID = 2.37" @ 12202' 4-1 /2" GS F N 9-5/8" X 7" TNV HLP PKR, ID = 6.184" --C 9-5/8" X 7" TM! DTH HGR, ID = 6.113" 9-5/8" CSG, 47#, L-80 BTC, ID = 8.681" -~ 7" LNR, 29#, L-80 NSCC XO TO 13CR-80 NSCC ~- 4-112" TBG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, ID = 3.958" 4-1/2" TBG STUB (05/05/10) --~ TOP OF 2-7/8" LNR 7" MARKER JOINT 4-1/2" TBG, 12.6#, 13CR-80 NSCT, .0152 bpf, ID = 3.958" FLOW-THRU WHIPSTOCK (11/18/00) 7" X 4-1/2" TNV SS PKR w/ XO, ID = 3.923" 99n' 10174' 11833' 12127' I 12203' I 04 29A SAFETY • HORIZONTAL WELL ANGLE> 70° @ 12404' * 2" CHROME TBG & 7" CHROME LNR *""' ORIG WELLBORE NOT SHOWN BELOW 04-29A MILLOUT 04-29AL1 WINDOW**` 1$18' - -~ 9-5/8" HES ES CEMEMEFt 1840' 13-3/8" x 9-5/8" BKR !SO-ZONE ECP, iD = 8.70" - 2,115' 4-112" 'X' NIPPLE 3.812" GAS LIFT MANDRELS MD TVD DEV TYPE VLV LATCH PORT DATE 3893 3511 52 MMG DOME RK 16 45;16./14 7317 5505 53 MMG SO RK 20 45/16/10 9610 6926 56 MMG DMY RK 0 9$03' 4-1/2" 'X' NIPPLE 3.812" g$32' 9-5/8" x 4-1/2" HES TNT PKR; ID = 3.903" 11977' 4-112" 'X' NlPi~LE 3.812" 12006' 7" x 4-112" HES TNT PKR, ID = 3.856" 12041 ° 4-1/2" 'X' NIPPLE 3.812" 12111' 4-112" 'XN' NIPPLE 3.725" 12137' 7" X 4-1/2" 1JMI OVERSHOT 12168' 7" X 4-1/2" BKR S-3 PKR ID = 3.875" 12203' 3-3/4" BKR DEPLOY SLV, ID = 3.00" 12208' 3-3/4" X 2-7/8" XO PIN, ID = 2.441 12241' 4-1/2" HES X NIP, ID = 3.813" (BEHIND LNR) 12254' I~ 4-1/2" WLEG (BEHIND LNR) I 12488' I PERFORATION SUMMARY REF LOG: BHCS 12/01/95 ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF ZONE INTERVAL Opn/Sqz DATE 2" 6 23P 12236 - 12250 C 06/03/05 2" 6 12250 - 12260 C 05/15/05 2" 6 12286 - 12296 G 05/15/05 3-3/8" 4 14P 12492 - 12530 G 05!16/96 4-1/2" SLTD 12628 - 13827 SLOT 12/18/95 2-7/8" SLTD 12968 - 13886 SLOT 11/24/00 7" LNR, 29#, 13CR-80, .0371 bpf, ID = 6.184" ~ 12628' 4-1/2" LNR, 12.6#, 13CR NSCT, .0152bpf, ID = 3.958" 12628' 4-1/2" SLTD LNR, 12.6#, 13CR NSCT, 13827' .0152bpf, ID = 3.958" 4-1/2" LNR, 12.6#, 13CR NSCT, .0152bpf, ID = 3.958" 13870' 7" MILLOUT WINDOW (04-29AL1) 12482' - 12488' II1~ h I ,~ ~I I I I I I 2-7/8" LNR, I I L-80 STL, 6.16#, I I .0058 bpf, ID = 2.441" 0~-~~~ 2-7/8" SLTD LNR, 6.1i D4;29AL.1 . ~. 12968' .~ DATE REV BY COMMENTS DATE REV BY COMMENTS 12/74/85 PKR 191 ORIGINAL COMPLETION 05/18/10 RCT/SV GLV GO (05/16/10) 04117/86 WW1 RWO 12/25/95 N2ES SIDETRACK (04-29A) 11/25/00 NOR 1 CTD SDTRACK (04-29AL7) 05/13/10 D141 RWO 05/18/10 SV DRLG HO CORRECTIONS PRUDHOE BAY UNff WELL: 04-29AL1 PERMfT No: 2001780 API No: 50-029-21453-60 SEC 35, T11 N, R15E, 261' FNL & 503' FWL BP Exploration (Alaska) Alaska Data & Consulting Services 2529 Gambell Street, Suite 400 Anchorage, AK 99503-2a36 ATTN: Beth Well Job # N0.5514 Company: State of Alaska Alaska Oil 8 Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD Z-30A P-16 03-Ot AWJI-00077 AYS4-00122 B9RH-00024 MEMORY GLS - - PRODUCTION PROFILE _ C X-FLOW CHECWIBP/CEMENT DUMP - 03/06/10 03/08/10 04/21/10 1 1 1 1 1 1 P2-22 BBUO-00007 USIT 03!09/10 1 1 U-03 03-37 S-111 R-28 BBKA-00021 BBKA-00023 65JN-00049 BCZ2-00009 X--FLOW CHECWP UG/C MENT G/ -- L STATIC PRESSURE SURVEY .. ~ INJECTION PROFILE ~- PRODUCTION PROFILE - ~ 04/22/10 04/24/10 04/19/10 04/26M0 1 1 1 1 1 1 1 1 R-04 BCZ2-00010 PRODUCTION PROFILE - 04!27/10 1 1 13-23A S-O6 Z-31 BBSK-00016 BBKA-00026 B3S0-00060 INJECTION PROFILE INJECTION PROFILE ~ INJECTION PROFILE 04/29/10 04/30/10 04/27/10 1 Y 1 1 1 1 17-22 14-07 04-29AL1 A AWJI-00085 AVYO-00066 .BBSK-00017 MEM PRODUCTION PROFILE / - PRODUCTION PROFILE USIT ~ 04/28/10 04/26/10 04/30/10 1 1 1 1 1 1 -O6 BBKA-00006 RST - 02/09/10 1 1 A-28 AYTO-00037 RST - 02/16/10 1 1 17-09A 17-09AP61 10AKA0129 10AKA0126 OH MWD/L D EDIT- ~ OH MWD/LWD EDIT ~ 02/11/10 02/07/10 2 2 1 1 PLEASE ACKNr1Wr Enn:c ocr cror ov cir_euu r_ w.,n o~t,....,,.,.....,~ ......., ~..... _,._ BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-i 900 E. Benson 8tvd. Alaska Data 8 Consulting Services 2525 Gambell Street, Sude 400 Anchorage, AK 99503-2638 05/07!10 • i ~~ ~-F'"~ ,; t ~ l.. , r~~~ ~ ,~~! ~ (~' (l f~ • • ~~a~~ 0~ Q~Q~~p /=~.~a~..~o~.oa David Reem Engineering Team Leader BP Exploration (Alaska), Inc P.O. Box 196612 Anchorage, AK 99519-6612 a~~~~$ Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 04-29AL1 Sundry Number: 310-117 • Vie, Dear Mr. Reem: ,., ~: ~:~*; •= " ' ~F r~ ~ ~~°~ ~ ~ Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this day of April, 2010. Encl. p STATE OF ALASKA ~„\~'J` ALASK~L AND GAS CONSERVATION COMMI~N APPLICATION FOR SUNDRY APPROVAL ~n Aac 2s 2an ~Et~EIl~E APR p 8 2010~`~a~° 1. Type of Request: ~~ ^ Abandon ^ Plug for Redrill ^ Perforate New Pool,®Repair Well ^ Change Approved Prog ^ Suspend ^ Plug Perforations ^ Perforate - ®Pull Tubing ^ Time Extension ^ Operations Shutdown ^ Re-Enter Suspended Well ^ Stimulate -®Alter Casing ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 200-178 - 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21453-60-00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: p13U 04-29AL1 - Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. Field /Pool(s): ADL 028324 - Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. PRESENT WELLCONDITION`SUMMARY ' Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 13922' - 8856' - 13922' 8856' 12192' None Casin Len Size MD TVD Burst Colla e Structural Conductor 1 1 7 Surface 1 - / " 2 11' 1 Intermediate 1 174' - ! " 1 174' 724 ' 87 47 Production Liner 5 ' 7" 996 ' - 1 4 71 4' - 1' 1 7 20 Liner 1 1 - / " 12 ' - 1392 ' 7 ' - 8 6' 1 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): Below Plug: 12236' - 13886' 8778' - 8861' 4-1/2", 12.6# 13Cr80 12254' Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV 12168' / 8736' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory - ®Development ^ Service ^ Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: Ma 1, 2010 - ®Oil ^ Gas ^ WDSPL ^ GSTOR ^ Abandoned 16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG ^ Plugged ^ SPLUG Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Hank Baca 564-5444 Printed Nam David Reem Title Engineering Team Leader 1 / Prepared By NameMumber Signature Phone 564-5743 Date tf. +~ / Zc~~ Terrie Hubble, 564-4628 Commission Use Onl Conditions of approval: Notify Commission so that a representative may witness Sundry Number: B OP Test ^ Mechanical Integrity Test ^ Location Clearance ^ Plug Integrity ~ ~~P % ~ ~ 3500 s ~ ~ Other . pr 4, f~Kn~--~~--" ~ aL ~~rca.'• ~~ SOU ' , Subsequent Form Required: I~, ~d~ APPROVED BY ~ ) I O Approved By: COMMISSIONER THE COMMISSION Date c ` Form 10-403 Ra ~R 1 ~ Z~'p~ Submit In Duplicate v~Z// t`` • • by cr,,,,~~ 04-29AL1 Rig Workover (Repair IA x OA communication and production liner) Scope of Work: Pull 4.5" 13Cr-80 completion. Run USIT log to find TOC, cut and pull 9-5/8" casing as deep as possible. Tie back 9-5/8" casing and cement to surface. PU 9-5/8" packer and test casing from 9950' to surface. Suspected liner top leak. Isolate leak(s). Run and cement 7" scab to cover leak(s). Run 4.5"13Cr-80 completion. Engineer: Hank Baca MASP: 2271 psi Well Type: Producer Estimated Start Date: May 1st, 2010 Pre-Ria Work Request: S 1 Dum 20' of slu its on to of WRP @ 12,192'. Set ~unk catcher on to of slu its. F 2 MIT-T to 3500 si for 30 minutes. MIT-IA to 500 si for 10 minutes to verif barrier. E 3 Power Jet cut 4-'/z" 13Cr-80 tubing at -12,128' MD, ~10' down first full joint above acker Reference tubin tall dated 12/22/95 . F 4 Circulate well with clean seawater and freeze rotect to 2000'. F 5 CMIT T x IA to 500 si for 10 minutes ost cut. 6 6 Check all lock down screws for free movement. Completely back out and check each lock down screw for breaka a check one at a time . PPPOT-T & IC. W 7 Set a BPV in the tubin han er. Proposed Procedure 1. MIRU. ND tree. NU and test BOPE (consisting of annular, 3-1/2" x 6" VBRs, blind/shear) to 250 psi low/3500 psi high. Circulate out freeze protection and circulate seawater. 2. Pull and LD tubing string to the cut. 3. Dress 4.5" tubing stub 4. RU wireline and run USIT from 3000' to surface. 5. Run 9-5/8" RBP and set 100' below TOC determined from USIT. PT RBP to 1000 psi to prove plug is set. Dump ~50 ft of sand on RBP. Note: VBRs will not be changed to 9-5/8" as there are two tested barriers to the reservoir. 6. Mechanically cut 9-5/8" casing in 1~" full joint above top of cement. Pull casing through stack. Dress stub in preparation of casing overshot. 7. Run in with 9-5/8", 47#, L-80 casing and tie-in to dressed stub. 8. Cement new 9-5/8" casing to surface. 9. Drill out 9-5/8"float equipment. 10. Cleanout above 9-5/8" RBP. Test tieback to 3500 psi for 30 minutes. Pull 9-5/8" RBP. '' 11. PU 9-5/8" packer and RIH to 9950'. Test casing above to 3500 psi for 30 minutes to verify minor . liner top leak. Move packer up hole to isolate leak if first test fails. 12. Run 7" 29# 13Cr-80scab liner to cover leak with adequate overlap. Length will be determined during step 11. • • 13. Cement 7" liner. 14. Drill out 7" float equipment. 15. Test scab to 3500 psi. 16. Recover 4.5"junk catcher ' 17. Run 4-'/z" 13Cr-80 stacked packer completion 18. Displace the IA to packer fluid and set the packer. 19. Test tubing .and IA to 3500 psi for 30 charted minutes. Freeze protect to 2,200' MD 20. Set TWC. ND BOPE. NU and test tree. Pull TWC and set BPV. RDMO. • C~ SAFEf Y NOTE: ~fiSZDNfA~ WB.l Afi~GtE ~ 70° ~ DATE 12111!85 REV BY PIQt191 WIC[-Nl'S ORKaYNALCOi111PLEf10N DATE tZlZis'07 Rill BY KS@iTLH ODM~IiS C1VCO 01117188 12/25195 YWrt N2ES fa40 S1~T~CK}04-29A) Ofi1IW08 05dQ5i~ ti^.dPJC li'~JC ORA1ViA000Rii:Cf10R~1S D?tA 11125J'DO NOR1 TRACK{0429A1t} 08251Q7 ~VGSV GLYCDSSETWt1P(08121147} 1 t128A7 RC~+JC GLV W1~iEtfi)1•B f08123A79 P BAY lAdf 14Fi1: 09-29A1t PERMT Na: 2041780 AANO' SD-029.21153.50 SEC 35, Tt tN. RtSE, 261' €fi.l4 503' R'1L 8P i'xPtoratlaf Qhsica) 6 TREE _ `' CNV 2000` 4-1/2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH 1 3886 2 7300 3 9594 4 11090 5 11985 -1/2" x 7" Halliburton TNT packer 4-1 /2" 12.6#/ft, 13Cr-80 VamTop tbg Unique chrome overshot ~5/8" CSG, 47#, L-80 BTC, ID = 8.681" ~ 10174' 7" LNR, 29#, L-80 NSCC XO TO 13CR-80 NSCC 11833' ~ 04-29AL1 • PROPOSED 68#, L-80 BTC, ID = 12.415" TOP OF 2-7/8" LNR I 12203' 7" MA RKER JOINT I 12220' 4-1/2" TBG, 12.6#, 13CR-80 NSCT, 12254' .0152 bpf, ID = 3.958" FLOW-THRU WHIPSTOCK (11/18/00) 12488' 7" X 4-112" TNV SS PKR w / XO, ID = 3.923" 12541' PERFORATION SUMMARY REF LOG: BRCS 12/01/95 A NGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF ZON INTERVAL OpnlSgz DATE 2" 6 23P 12236 - 12250 C 06/03/05 2" 6 12250 - 12260 C 05/15105 2" 6 12286 - 12296 C 05/15/05 3-3/8" 4 14P 12492 - 12530 C 05/16/96 4-1/2" SLTD 12628 - 13827 SLOT 12/18/95 2-7/8" SLTD 12968 - 13886 SLOT 11/24/00 7" LNR, 29#, 13CR-80, .0371 bpf, ID = 6.184" 12628' 4-1/2" LNR, 12.6#, 13CR NSCT, .0152bpf, ID = 3.958" 12628' 4-1/2" SLTD LNR, 12.6#, 13CR NSCT, -~ 1 0152bpf, ID = 3.95E" 4-1/2" LNR, 12.6#, 13CR NSCT, .0152bpf, ID = 3.958" --C 12168' 7" X 4-1 /2" BKR S-3 PKR, ID = 3.875" 12192' 4-1/2" WRP(O8/24/07) 12203' 3-3/4" BKR DEPLOY SLV, ID = 3.00" 1220$' 3-3/4" X 2-7/8" XO PIN, ID = 2.441 12241' 4-1/2" HES X NIP, ID = 3.813" (BENIN' 14-1/2" WLEG (BE]iIND LNR) I i~ 7" MILLOUT WINDOW (04-29AL1) 12482' - 12488' I I I I ~4;29AL1 I I 13888' PBTD I I 2-7/8" LNR, 12968' I I L-80 STL, 6.16#, I I .0058 bpf, ID = 2.441" OI4-29J4 2-7/8" SLTD LNR, 6.16", L-80, 13886' ~I I .0058 bpf, ID = 2.441" 2-7/8" LNR, 6-16#, L-80 STL, 13922' .005E bpf, ID - 2.441" from old TOC to surface 13-3/8" CSG, 72#, L-80, ID = 12.347" 2550' Minimum ID = 2.37" @ 12202' 4-1 /2" GS FN 7" 29# chrome scab liner cmt'd -9600'-9978' DATE REV BY COMMENTS DATE REV BY COMMENTS 12/14/85 PKR 191 ORIGINAL COMPLETION 12/26/07 KSB/TLH GLV GO 04/17/86 WW1 RWO 06/04/08 RGPJC DRAWING CORRECTIONS 12/25/95 N2ES SIDETRACK(04-29A) 06/06/08 RGPJC DRAWING CORRECTIONS 11/25/00 NOR 1 CTD SDTRACK (04-29AL1) 08/26/07 SWGSV GLV GO & SET WRP(08/24/07) 11/28/07 RGPJC GLV CORRECTIONS (08/23/07) PRUDHOE BAY UNIT WELL: 04-29AL1 PERMfr No: F2001780 API No: 50-029-21453-60 SEC 35, T11 N, R15E, 261' FNL & 503' FWL BP Exploration (Alaska) Page 1 of 1 Schwartz, Guy L (DOA) From: Baca, Hank [hank.baca@bp.com] Sent: Monday, April 12, 2010 2:21 PM To: Schwartz, Guy L (DOA) Cc: Bjork, David (Northern Solutions) Subject: RE: 04-29AL1 RWO (PTD 200-178) Guy, if you take a look at pre-rig step 2 in what we filed you'll notice we're getting a new MIT-T and verifying an IA barrier to 500 psi. That work has not been completed yet. The IA leak rate was too small to measure @ 3000psi last time it was checked. Tubing held to 3000 psi last time we checked. Both those tests were done in 2007 and need to be redone. A leak detect log showed a leak @ 9974' which is suspiciously close to liner top packer depth. Step 5 in the main procedure is testing a 9.625" bridge plug @ probably 2500'. If the pre-rig IA test fails we'll move the packer test up from step 11 in rig portion of the program and find our leak(s). Terrie left copies of the 2 sundries she filed for this well on my desk, so you should already have the dual paperwork. Hope that answers your questions. Dave Bjork will be taking this well so let him know if it doesn't. Thanks, Hank Baca Drilling Engineer 907-564-5444 office 907-748-0997 cell From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Monday, April 12, 2010 1:54 PM To: Baca, Hank Subject: 04-29AL1 RWO (PTD 200-178) Hank, In reviewing the RWO I did't see the current CMIT results listed. You state a IA X OA leak but don't indicate the rate loss or where it is located in the 9 5/8" casing. Will it hold 1000 psi ??? (ie step #5) Is the OA arctic packed?? Was curious as to what evidence there was for the liner lap leak too. Could you elaborate on this.... In addition the Sundry is written under the L1 lateral PTD. The motherbore PTD 04-29A) would be more appropriate but in reality the wellwork should be reported for both PTD numbers. Please submit another sundry for 04-29A . At completion wellwork reports (404's) will be needed for both motherbore and 04-29AL1. 1 realize this is some duplication but it keeps our well records complete. Don't hesitate to call if you have any questions. Thanks in advance. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 4/12/2010 ) STATE OF ALASKA ') ALASKA OIL AND GAS CONSERVATION COMMISSION Rf=Cf::I\/E .~'I~ REPORT OF SUNDRY WELL OPERATIONS" " .,~",J} JUL 0 1 2005 Stimulate CA ~. OtherD róJ:.dŒ Od & Gas (~on'~ f" ..',' waiverD Tt~e ~tenšto'trE!Jì\nm~W~! li¿¡~r,hlkrafD1e Re-enter Suspended'Well D 1. Operations Performed: Abandon D Alter CasingD Change Approved Program D Repair WellO Pull TubingD Operation Shutdown 0 Pluç¡ Perforations 0 Perforate New Pool D Perforate ŒJ 2. Operator Name: 3. Address: BP Exploration (Alaska), Inc. 4. Current Well Class: Development [!] ExploratoryD 5. Permit to Drill Number: 200-1780 6. API Number 50-029-21453-60-00 P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 60.10 8. Property Designation: ADL-028324 11. Present Well Condition Summary: Total Depth measured 13930 feet true vertical 8854.9 feet Effective Depth measured 13922 feet true vertical 8856.0 feet Casing Length Size CONDUCTOR 120 20" 91.5# H-40 SURFACE 57 13-3/8" 68# K-55 SURFACE 2466 13-3/8" 72# L-80 INTERMEDIATE 10147 9-5/8" 47# L-80 LINER 1846 7" 29# L-80 LINER 658 7" 29# 13CR80 PRODUCTION 758 2-7/8" 6.16# L-80 PRODUCTION 918 2-7/8" Slotted LNR PRODUCTION 36 2-7/8" 6.16# L-80 StratigraphicD ServiceD 9. Well Name and Number: 04-29AL 1 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool Plugs (measured) None Junk (measured) None MD TVD Burst Collapse 29 149 29.0 149.0 1490 470 27 84 27.0 84.0 3450 1950 84 - 2550 84.0 - 2511.3 4930 2670 27 - 10174 27.0 - 7239.4 6870 4760 9987 - 11833 7133.7 - 8487.3 8160 7020 11833 - 12491 8487.3 - 8881.0 8160 7020 12210 - 12968 8762.9 - 8878.6 13450 13890 12968 - 13886 8878.6 - 8860.8 13886 - 13922 8860.8 - 8856.0 13450 13890 Slotted Liner: 12968 - 13886 Perforation depth: Measured depth: 12236 - 12250, 12250 - 12260, 12286 - 12296 True vertical depth: 8778.08 - 8785.81, 8785.81 - 8791.23, 8804.89 - 8809.99 Tubinç¡ ( size, ç¡rade, and measured depth): 7" 29# 13CR80 5-1/2" 17# L-80 4-1/2" 12.6# 13CR80 @ @ @ 8879 - 8861 ,_ ....- rr-¡ 2GGS 2aSCANNEl..;. Jut 0 f . 30 12254 25 28 30 Packers & SSSV (type & measured depth): 4-1/2" Baker S-3 Perm Packer 4-1/2" Cameo TRDP-4A SSV @ 12168 @ 2200 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: RBDMS 8Fl .lUL 0 fi 'nn~ Prior to well operation: Subsequent to operation: Oil-Bbl SHUT-IN 550 Representative Dailv Averaqe Production or Injection Data Gas-Me! Water-Bbl Casing Pressure Tubing Pressure 204 322 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact DeWayne Schnorr Printed Name DeWayne Schnorr 0 Signature þ~ ,~-d'" L-,,,."/ Form 1 0-404 Revised 4/2004 13 12711 14. Attachments: Copies of Logs and Surveys run _ Daily Report of Well Operations_ ~ 3494 15. Well Class after proposed work: ExploratoryD 16. Well Status after proposed work: OilŒ] GasD Developm ent ŒJ Service D WAG D GINJD WINJD WDSPLD Prepared by DeWayne R. Schnorr (907) 564-5174 Sundry Number or N/A if C.O. Exempt: N/A Title Petroleum Engineer Phone Date 7/1/05 564-5174 ) ) A\~aska Œ~ & Cijn~. .'r! dÎ1 [; ~~ !¡] r¡] ~J!? 05/14/05 ***WELL SHUT IN ON ARRIVAL ***(DRIFT FOR PRE ADPPERF). DRIFT W/101 X 21/811I" TO 124501 SLM (HAD TO BOUNCE INTO TOP OF LINER @ 121731 SLM) 04-29AL 1 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY F<EC~E"lf::' JUl (} 1 2005 05/15/05 SHOT 122501-12260' AND 12286'-122961 WITH 211 HSD 6SPF 60 DEG PHASED PJ2006 CHARGES. USED GAMMA RAY TO CORRELATE TO ATLAS DLL LOG DATED 9-DEC- 95. ALL SHOTS FIRED, DID NOT TAG TD. 06/03/05 PERFORATED 122361-122501 WITH 211 HSD 6SPF 60 DEG PHASED PJ2006 141 GUN. USED GAMMA RAY TO CORRELATE TO ATLAS DLL LOG DATED 09-DEC-95. DID NOT TAG TD, ALL SHOTS FIRED. FLUIDS PUMPED BBLS o No Fluids Pumped o TOTAL Page 1 I 9-5/8" CSG, 47#, L-80, ID = 8.681" l-i 10174' ~ 7" LNR, 29#, L-80, 0.0371 bpf, 10 = 6.184" l-i 11833' ~:g 2-7/8" LNR, STL, 6.16#, L-80, 0.0058 bpf, ID = 2.441" FMC GEN 3 CrN " .. . .".".."....,,,,, OTIS 60' TREE = WELLHEAD = ÄCTUATOR;" .... I KS. ä§j; SF. ElBi; .... KÔÞ; Max Angle; DaiumMD = ÖatumTVÖ;'; .. .... ) 1875' ·94@12¿7~i 12960' 8800' SS 7" TBG, 26#, _?, 0.0383 bpf, 10 = 6.276" l-i 28' TOP OF 4-1/2" TBG l-i 28' 13-3/8" CSG, 72#, L-80, ID = 12.347" l-i 2550' Minimum ID = 2.37" @ 12202' 4-1/2" GS FN TOP OF 7" LNR l-i 9987' TOP OF 2- 7/8" LNR l-i 12210' 14-1/2" TBG, 12.6#, 13-CR-80, 0.0152 bpf, 10 = 3.958" l-i 12254' TOP OF WHIPSTOCK l-i 12488' ÆRFORA TION SUMMARY REF LOG: BHCS 12/01/95 ANGLEATTOPÆRF: 56 @ 12236' Note: Refer to Production DB for historical perf data SIZE' SPF INTERVAL Opn/Sqz DATE 2" 6 12236 - 12250 0 06/03/05 2" 6 12250 - 12260 0 05/15/05 2" 6 12286 - 12296 0 05/15/05 r---o I.?-" 8.. 138 SG SLOTTED ·1.2000 pa?2 SL TD 11/24/00 7"'LNR, 29#, 13-CR-80, 0.0371 bpf, ID = 6.184" l-i 12628' 04-29AL 1 SAr"\Y NOTE: LATERAL COMPLETION. HORIZONTAL W~} 70° @ 12419 AND 90° @ 12679' *** 4-1/2" CHROMETBG & 7" CHROMELNR- ***IAx OACOMM. INCREASE THE OPERATING PRESSURE OF THE 13- 3/8" ANNULUS TO 2000 PSI (09/12/02 WAIVER) *** I 28' l-i 7" X 5-1/2" X 4-1/2" XO 1 !@} - - 2200' l-i 4-1/2" CAMCO TRDP-4A SSSV, 10 = 3.812" e ~ GAS LIFT MANDRELS ST MD TVD DEV 1YÆ VLV LA TCH PORT DATE 1 3404 3213 52 MBX DOME BK2 16 2 7312 5502 49 MBX DOME BK2 16 -1- 3 9401 6804 47 MBX DOME BK2 16 07/17/02 4 10529 7480 40 KBG2LSMOD DMY INT 0 5 11194 7980 37 KBG2LSMOD SO INT 22 07/17/02 ~1::::\: 6 11620 8322 61 KBG2LSMOD DMY INT 0 ~~:i::~: iIiiIiw,¡¡¡¡¡ ~ I ~ 12168' l-i 7" X 4-1/2" BAKER S-3 PKR 1 12202' 1-i4-1/2" GS FN, ID = 2.37" 1 12242' 1-i4-1/2" HES X NIP, ID = 3.813" (BEHIND LNR) 12254' l-i 4-1/2" TUBING TAIL WLEG 1 RE'-(~E ' :':\I"'~ ~ ':]C:I,.' 3"¡tf.~ JUL 0 1 2005 r--..4 , , ~¡¡ ~ 0 ' . , '¡'~VJ1SKa.! &: , , , , , , , , , , , , , , , , , , , ~ l-i 12968' TOP OF 2-7/8" SL TO LNR l-i 12968' 12-7/8" SLTDLNR, 6.16", L-80. .0058 bpf, ID=2.441" l-i 13886' TOPOF2-7/8"LNRI-i 13886' ~ 2-7/8" LNR, STL, 6.16#, L-80. 0.0058 bpf. ID = 2.441" l-i 13922' DATE y 12/85 12/25/95 11/25/00 02/28/02 07/17/02 03/22/03 REV BY COMMENTS ORIGINAL COM PLETION SIDETRACK COM PLETION SIDETRACK CTU CORRECTIONS GL V C/O W A IV ER DA TE CORRECTION TD l-i 13930' DA TE REV BY COMMENTS 05/15/05 NBF/PJC ÆRFORA TIONS 06/05/05 GJB/TLH ADÆRF RNlTP JB/KA K JMP/KK PRUDHOE BA Y UNIT WELL: 04-29AL 1 ÆRMIT No: "2001780 '0 API No: 50-029-21453__ SEC 35 T11 N R15E 1304' FEL 3999' NSL BP Exploration (Alas ka) F:\LaserFiche\CvrPgs _Inserts\Microfilm _ Marker.doc MICROFILMED 04/01/05 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE Permit to Drill 2001780 MD 13922 / 'I'VD DATA SUBMITTAL COMPLIANCE REPORT 1116~2003 Well Name/No. PRUDHOE BAY UNIT 04-29AL1 Operator BP EXPLORATION (ALASKA) INC 8856 J Completion Dat 11/26/2000 /' Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-21453-60-00 UIC N REQUIRED INFORMATION Mud Log N_~o Sample N_.~o Directional Survb'y ~-l~e-~- ~ DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt Log Log Run Name Scale Media No Interval Start Stop (data taken from Logs Portion of Master Well Data Maint OH I CH Dataset Received Number Co~mments 2/7/2002 10612 ~ ED D Ver LIS Verification 1 ED D Ver LIS Verification 1 R R MWD Sruvey Report FINAL Rpt Ver LIS Verification 1 D D MWD Survey Report FINAL R R MWD Survey Report FINAL D D MWD Survey Report FINAL ED C Ind Induction/Resistivit~ 1 !ED C Ind Induction/Resistivity ~ I 12460 12460 12460 12460 12460 13876 13756 13756 13922 13922 Open(!... Open~/2002 1/9/2001 Open ~002 1/9/2001 1/9/2001 1/9/2001 0pe~/27/2002 Open c,,,~/2-7/2002 10613 '~P~ 10613 ~pSBr~ey Rep°rt Paper C°py Survey Report Digital Data Survey Report Paper Copy Survey Report Digital Data 11218 ~'"~'7'~t~· Well Cores/Samples Information: Interval Name Start Stop Sent Received Dataset Number Comments ADDITIONAL INFORMATION Well Cored? Y Chips Received? Analysis R ~.c.~.iv~.d ? Daily History Received? ~ N Formation Tops ~/N Comments: Permit to Drill 2001780 DATA SUBMITTAL COMPLIANCE REPORT 1/1612003 Well Name/No. PRUDHOE BAY UNIT 04-29AL1 Operator BP EXPLORATION (ALASKA) INC APl No. 50-029-21453-60-00 MD 13922 TVD 8856 Compliance Reviewed By: Completion Dat 11/26/2000 Completion Statu 1-OIL Current Status 1-OIL Date: ~ To: WELL LOG TRANSMITrAL State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 June 12, 2002 MWD Formation Evaluation Logs · 4-29AL1 & 4-29AL1PB1, AK-MW-00267 4-29A LI: ~ I ,~l cd Digital Log Images: 50-029-21453-60 4-29A L1 PBI: I I oq Digital Log Images: 50-029-21453-70 1 CD Rom 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: RECEIVED S£p 27 2, 4t,~,.~:,.~ ,, 002 ~~'e ~i~n WELL LOG TRANSMITTAL To: State of Alaska February 06, 2002 Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7~ Avenue, Suite 100 Anchorage, Alaska RE: MWD Formation Evaluation Logs 4-29A L1 PB 1, AK-MW-00267 1 LDWG formatted Disc with verification listing. API#: 50-029-21453-70 PLEASE ACKNOWLEDGE RECEIPT BY 'SIGNING AND RETURNING A COPY OF TItE TRANSMITTAL LETTER TO TitE ATTENTION OF:. Sperry-Sun Drilling Services Attn: Jim Gal~ 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 RECEIVED Date: FEB 0 7 2002 WELL LOG TRANSMITTAL To: State of Alaska February 06, 2002 Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7~ Avenue, Suite 100 Anchorage, Alaska RE: MWD Formation Evaluation Logs 4-29A L1, AK-MW-00267 1 LDWG formatted Disc with verification listing. API#: 50-029-21453-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Atto: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 o ECEIVED FEB O 7 2002. Re: MP F-73a (200-178) Completion Change Subject: Re: MP F-73a (200-178) Completion Change Date: Mort, 16 Apr 2001 12:21:34 -0700 From: Tom Maunder <tom_maunder~admin.state.ak. us> To: "Stagg, Ted O (ORBIS)" <StaggTO~BP. com> Ted, Thanks for the information. Nothing further will be required. When the 407 is filed, this change can be captured there. Please call if there are any questions. Tom "Stagg, Ted O (ORBIS)" wrote: Tom, SLB/Nordic I has reached TD on MPF-73a at a depth of approx. 14,606'. This is approx. 600 ft shy of the permitted TD of the sidetrack. Drilling has been stopped at this point due to Iow resistivity of the Sag River interval targeted for this well. The completion plan has been modified from that described in the Permit to Drill (200- f 98). The 100% slotted liner originally planned has been changed to a combination cemented and slotted liner. Both the solid and slotted liners will be 2 7/8", no 3 3/16" will be used in this completion. The mason for the change is that a significant lost circulation zone was encountered at approx. 13, 640'. This loss zone was successfully sealed with a bentonite.cement treatment. However, to insure continued isolation from the loss zone a 2 7/8" solid liner will be run from approx. 300 ft above the window (top of 2 7/8" ~ 12,400) to approx. 150 fl below the loss zone, 13, 800. The solid liner will be cemented with a minimum of g bbls Class G cement. Slotted liner will extend from 13, 800' to TD at approx. 14, 606'. The cement portion of the completion will be perforated above the loss circulation zone, I am attaching a schematic of the planned completion. Please advise if further info is needed for this change in completion plans. Ted Stagg < <MPF- 73a Revised Completion. doc>> mm ..... s ~ ~-mmmmmmmmmmmmmmmmmmmm~mmmmmmmm~mmmm Name: MPF-73a Revised Completion.doc MPF.73a Revised Completion. doc Type: WINWORD File (application/msword) Encoding: base64 Tom Maunder <tom maunder~admin.state.ak, us> Petroleum Engineer Alaska Oil and Gas Conservation Commission 1 of 2 4/16101 12:22 PM Tm.a: FMC2 ~16" x 5M .Ut/aJlam~ 11' x 71/16" 5MGen 5a wi 2 7B" Fll~tbg hn~, 3' Ll-lacme ~t lhreads x 2 7/8" 8roi onbdtrm, 25" ClW H' BIN' p~file [ , , i i ,. ,lill lJi i i iii i i , , i i ,i , , MPF-7:~ Proposed CTD Completion (REVISED 4/16101) Orig. KBEbv. =41.4' (N22E) Odg. GLEIev. = 115' ~To Tb;. Spod =2S.~ (NME) D~ym 141 ~B_~. =42 Mix. holeargle =641o 66deg. ff 4,445'to8,627 I-bb =,mb ttmt n~r~ = 7" 26 ppf, L-80, BTC, MrxJ production csg ( drilt ID=6.151", cap. = 0. __O'~__ bpf ) *** NOTE *** This well has no tubing. Inner annulus valves must be blinded or double valved with a "DO NOT BLEED" sign. Two 7' x 21' mad~rjohts fl 10,547 - 10.58~ 7~Ceing~ ~ Top of 2 718" liner to be approx. 12,400'. Top of 4 1/2. mechanicaI .... I ..~ whipstock was set at 12,707'. -~ , . 2 718" ST-I. Pm-Drilled liner approx. 13,800 to TD at 14,606'. 4 1/2" 12.6~ L-80 IBT-Mod 12,758' Latch collar, double float collars, ported sub, baffle plate (will be milled out after cementing) WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil r~ Gas [~ Suspended r'~ Abandoned r'~ Service D 1~ 2. Name of Operator Id, a'~a~J~', 7. Permit Number BP Expl°rati°n (Alaska)' Inc' ~.VH,~ ~ 200'178 3. Address l~ 8. APl Number P. O. Box 196612 Anchorage, AK 99519-6612 50-029-21453-60 4. Location of well at sudace 9. Unit or Lease Name 258' FNL, 4774' FEL, Sec. 35, T11N, R15E, UM (asp's 713341,5951626) '""~'''~"r'!'--''~"'"~'l":i~'.: "'i Prudhoe Bay Unit At Top Producing Interval :~!~,~t>'"" 10. Well Number 12577'FNL, 2394'FEL, SEC36, T11N, R15E, UM (asp's721029,5950851) '""~,.-_~. ............... ' 04-29AL1 At Total Depth ? ---" "~"::' ".,,,,a~- ' ' 11. Field and Pool 137' FNL, 1819' FEL, SEC 36, T11N, R15E, UM (asp's 721571, 5951988) ~ ............... Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 60.1 feetI ADL 28324 Prudhoe Bay Oil Pool ~12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if offshore 16. No. of Completions November 19, 2000 November 24, 2000 November 26, 2000 I N/A feet MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Sun/ey 120. Depth where SSSV set 21. Thickness of Permafrost 13922' MD /8856' TVD 13888' MD /8861' TVD YES ~] No D'1 2200' feet MD 1900' (approx) 22. Type Electric or Other Logs Run MWD GR & Resistivity 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD I CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 20" 91.5# H-40 Surface 120' 30" 1830# Polyurethane 13-3/8" 68#/72# K-55/L-80 Surface 2550' 17-1/2" 101 sx AS I, 400 Sx CS II, & 2500 Sx CS III 9-5/8" 47# L-80 Surface 10174' 12-1/4" 500 Sx Class G 7" 29# 13CR/L-80 9969' 12491' 8-1/2" 500 Sx Class G 4-1/2" 12. 6# 13CR-80 12541' 13870' 6" Uncemented 2-7/8" 6.16# L-80 12203 13992 3-3/4" Uncemented 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7" 28' 12540' 12939'- 13992' MD; 8880' - 8856' TVD; (Slotted Liner) 5-1/2" 30' 12168' 12 Slots per ft, 6" centers, O. 187" wide, 2" long, & side staggered 4-1/2" 12254' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED (See Sidetrack Summary for details) 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) December 11,2000 Gas Lift Date of Test Hours Tested ~Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO 12/20/2000 4.0 Test Pedod >I 2705 Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) Press. -237 psi 24-Hour Rate > 431 1166 2976 28. CORE DATA , Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. * This 10-407 is submitted as directed per the 10-401 form approved November 9, 2000 (Permit #200-178) RECEIVED JAN 1 1 ZOO1 Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE ORIGII AL. 'Anchorage 29. NAME Top of Sadlerochit Top of Zone 1 B GEOLOGIC MARKERS MEAS, DEPTH Top of Zone lA 12339' 12470' TRUE VERT. DEPTH 8770' 8831' 8876' 30. ('~ FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. 31. LIST OF A'I-rACHMENTS Summary of 04-29AL1 CT Sidetrack Drilling Operations + End of Well Survey. 32. I hereby certify that the following is tree and correct to the best of my knowledge. Signed ~~'~~~"~ Title BP Coiled Tubin.cl En.qineer Date Prepared by Paul Rauf 564-5799. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24.' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Shut-in, Other-explain. Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Item 28: If no cores taken, indicate "none". ORt61IXIAL Form 10-407 RECEIVED JAN 1 3. 001 Alaska 0il & Gas Cons. Commission 'Anchorage ' (' (' RECE!VED . . .. .. · .. "BP 'EXPLORATION' JAN l'l',~,_?011~age '1 of 6 Operations Summ'a Report · ' Naska 0il & Gas Cons. CommiSsion Legal Well Name: 04-29 Common Well Name: 04-29AL1 Spud Date: 11/13/1985 Event Name: REENTER+COMPLETE Start: 11/16/2000 End: Contractor Name: NORDIC CALISTA Rig Release: 11/26/2000 Group: COIL Rig Name: NORDIC 1 Rig Number: ":" ' .........................,,i~ ................ :~.. ...., ,,ha"~ ................. : ' "" · ==""~'.' ':' .'" . .... · ...... ' .... · ·Date .From -.T° Hours Tas . cS.(~db.e P e...i: :...= :' .. DeScriPtion :of. Operations .... '..':...... ... .... 11/1512000 21:00 - 22:00 1.00 BOPSUF PROD1 Move over well. Accept rig for operations at 21:00 hrs 11/15100. ND tree cap. NU BOPE. 22:00 - 00:00 2.00 BOPSUF PROD1 Spot cuttings tank and berm. Begin BOP test. Tree valves leaking. Called for grease truck. 11116/2000 00:00 - 05:30 5.50 BOPSUF PROD1 BOPE test. Test witnessed by AOGCC Rep Lou Grimaldi. Have 250 bbls of Flopro on location and 250 bbls of KCI. 05:30 - 07:00 1.50 WHSUR PROD1 . Waiting on DSM to come out and pull BPV from tubing hanger. 07:00 - 07:45 0.75 WHSUR PROD1 ;RU lubricator to pull BPV. 07:45 - 09:00 1.25 WHSUR PROD1 PJSM. Show DSM personnel rig orientation video. 09:45 - 10:30 0.75 WHSUR PROD1 Pull BPV above master valve. Close master valve and bleed off pressure above. Slight blow. Call grease crew and grease master to ensure holding. Retrieve BPV and RD lubricator. 10:30 - 11:00 0.50 WHSUR PROD1 Hook up trucks and prep to bullhead kill well. 11:00 - 11:15 0.25 WHSUR PROD1 PJSM and hazard identification prior to well kill. 11:15 - 12:00 0.75 WHSUR PROD1 Bullhead 225 bbl KCI to well at 7 bpm 1650 psi WHP. 12:00 - 13:15 1.25 WHSUR PROD1 Switch to FIo-Pro and bullhead +/- 35 bbl to catch fluid. Bullhead at 7 bpm 1320 psi WHP. Slow down to 1 bpm after seeing pressure rise - FIoPro at perfs. SD pumping at 270 bbl away. 13:15 - 13:30 0.25 WHSUR PROD1 Allow WHP to bleed down from 650 psi to250 psi 13:30 - 14:00 0.50 WHSUR PROD1 Bleed remaining pressure off thru choke and flowcheck well - OK. 14:00 - 15:00 1.00 STWHIP PROD1 Pull Baker tools to rig floor and check out with service tech and MWD tech. 15:00 - 15:45 0.75 STWHIP PROD1 Hold Pre-job operational and safety meeting prior to PU whipstock. Messrs Gunkel, Karish and Kilfoyle in attendance. 15:45 - 16:00 0.25 STWHIP PROD1 Pressure test coil connector. 16:00 - 17:15 1.25 STWHIP PROD1 MU MWD and orienter. Align scribe line with whipstock face and MU same. PU injector. 17:15 - 20:35 3.33 STWHIP PROD1 RIH with whipstock and MWD assembly. RIH to 12355 ft 20:35 - 21:30 0.92 STWHIP BHA PROD1 Unable to get signal from MWD. POH. 21:30 - 00:00 2.50 STWHIP BHA PROD1 POH. Stand back injector. Break down tools 11117/2000 00:00 - 00:45 0.75 STWHIP BHA PROD1 OOH. Some metal shavings on MWD. Found Inflation valve shifted. Need to re-dress it. 00:45 - 02:45 2.00 STWHIP BHA PROD1 Wait on inflation valve to be re-dressed. Add one additional shear pin to increase set pressure by 500 psi. Valve on location. 02:45 - 03:00 0.25 STWHIP BHA PROD1 MU BHA. Align scribe line with whipstock face. Pick up injector. 03:00 - 06:00 3.00 STWHIP BHA PROD1 RIH w/whipstock and MWD. Performed MWD shallow test. RIH to 12360'. 06:00 - 09:30 3.50 STWHIP PROD1 Log down to 12500' GR depth and tie in with MWD GR to get on depth. A bit confusing for a while but think we got it finally. FAX log strip in to Anch ODE to confirm depth correlation. 09:30 - 11:30 2.00 STWHIP PROD1 Re-log down from 12200' GR depth to get additional tie-in data - still not convinced on tie-in data. Discuss with ODE. Agree on correction to depth (-5'). 11:30- 11:45 0.25 STWHIP PROD1 RIH and position btm of whipstock at 12506.7'. (TOW 12490'). TF reading at 21L. Incr pump rate to 2.8 bpm and max pump pressure 5100 psi. SD pump and bleed off all pressure. Pressure up to 1900 psi and started getting returns. FAIV did not actuate. 11:45 - 12:45 1.00 STWHIP PROD1 Repeat process with TF now 04L trying to close FAIV - no success. Put call in to HB&R for hot oil truck. Discuss plan with ODE & Baker. Decide to POH and look at/redress FAIr and not risk partial set of whipstock if FAIV is washed. Printed: 11/28/2000 8:50:16 AM , (" ( RECEIVED BP EXPLORATIONJAN1 1 ~0'01 page2 of 6 Operations Summary Report Cons. Legal Well Name: 04-29 Common Well Name: 04-29AL1 Spud Date: 11/13/1985 Event Name: REENTER+COMPLETE Start: 11/16/2000 End: Contractor Name: NORDIC CALISTA Rig Release: 11/26/2000 Group: COIL Rig Name: NORDIC 1 Rig Number: '.'.Date ...From. To .'Hours 'TaSkI ' ~phase .. .' .'Description'ofOperati°ns. . .. . .. ....... . . . 11/17/2000 12:45 - 15:30 2.75 STWHIP CSUB PROD1 Flag pipe. POH to re-dress FAIV. 15:30 - 16:15 0.75 STWHIP CSUB PROD1 OOH. Stand back injector. Replace Baker FAIV assembly. Check whipstock face alignment to MWD scribe line. Check MWD - OK to re-run. MU BHA for run #3. 16:15 - 17:00 0.75 STWHIP CSUB PROD1 Displace coil to KCI brine to help setting process for FAIV. MU injector. 17:00 - 20:00 3.00 STWHIP PROD1 RIH to flag and space out to set whipstock 10' higher than flag measurement. Check WS face orientation. 20:00 - 20:15 0.25 STWHIP PROD1 Hold PJSM to discuss job hazards. 20:15 - 21:30 1.25 STWHIP PROD1 Corrected depth. Pick up 17 ft. Orienting. Top of whipstock at 12480'. 24L 21:30 - 21:40 0.17 STWHIP PROD1 Increase rate to 3.3 to arm FAIV. Bleed off pressure. Pressure up slowly to 3300 psi. Set whipstock. Set down 3K. POH. 21:40 - 00:00 2.33 STWHIP PROD1 POH. 11/18/2000 00:00 - 01:00 1.00 STWHIP PROD1 POH with WS setting tools. 01:00 - 01:30 0.50 STWHIP PROD1 OOH. Lay down BHA. 01:30 - 02:00 0.50 STWHIP PROD1 PU motor and diamond window mill. 02:00 - 04:30 2.50 STWHIP PROD1 RIH w/motor and mill. Tag whipstock. Corrected depth. TOWS @ 12480'. First motor work at 12482.5' - pinch point. 04:30 - 07:15 2.75 STWHIP PROD1 Begin milling window to 12486.4'. 2.5/2.5 bpm 2580 psi. 07:15 - 08:45 1.50 STWHIP PROD1 Continue milling window: 12487.6' 2.6/2.6 bpm 2750 psi 08:45 hrs. Started drilling formation at 12487.6'. 08:45 - 12:30 3.75 STWHIP PROD1 Cont milling formation from 12487.6' to 12493.3'. Work back and forth thru window to clean up. Several stalls at 12491' mill depth. Continue milling formation to 12498': +/- 10' formation made from bottom of window. 12:30 - 14:00 1.50 STWHIP PROD1 Work string mill across window slowly to clean up burrs and rough edges. Work mills from 12480'-12492'. Make 2 dry passes - look good. 14:00- 16:15 2.25 STWHIP PROD1 POH for drilling package. 16:15 - 16:30 0.25 STWHIP PROD1 OOH. LD window milling tools. Both mills gauged at 3.79" OD. 16:30 - 17:15 0.75 DRILL PROD1 MU drilling BHA and bit #1. HYC DS49, 1.1 deg motor, MWD GR/EWR. 17:15 - 17:45 0.50 DRILL PROD1 Upload resistivity tool. MU injector. 17:45 - 20:00 2.25 DRILL PROD1 RIH to 12355'. 20:00 - 00:00 4.00 DRILL PROD1 Log off. Tie in. Correct depth (-13) 11/19/2000 00:00 - 00:15 0.25 DRILL PROD1 Correct depth (+2) 00:1,5 - 00:25 0.17 DRILL PROD1 Orienting. i00:25 - 02:00 1.58 DRILL PROD1 Drilling at 2.5/3400135L Orienting. Drilling @2.4/3200/79L Drill to 12568' 02:00 - 03:15 1.25 DRILL PROD1 Continue drilling @2.5/3450/97L. Stalled out. Drill to 12615'. 03:15 - 03:30 0.25 DRILL PROD1 Wiper trip to the window 03:30 - 06:00 2,50 DRILL PROD1 Continue drilling @ 2.6/3500/76L. Drill to 12710'. 06:00 - 07:45 1,75 DRILL PROD1 Drilling @2,6/3640/91L. Getting weight stackout and occasional overpulls. 12784'. 2.6/2,6 bpm, 3660 psi. 91L. 70 fph. Drill to 12800'. 07:45 - 08:30 0.75 DRILL PROD1 Short trip to window to clean up hole. RIH to bottom - hole looks good. 08:30 - 09:30 1.00 DRILL PROD1 Drill ahead but difficulty getting string to slide, Have ordered out new FIo-Pro mud system. Worry down to 12805' and then took off drilling better but quit at 12811' again. 09:30 - 10:15 0.75 DRILL PROD1 Trip up to window to try and clean hole up again. RIH. Hole looks good with no tight spots. 10:15 - 10:30 0.25 DRILL PROD1 Attempt to drill ahead - no go. Struggled down to 12816', No further Printed: 11/28/2000 8:50:16 AM RECEIVED .., J/ N BP EXPLORATION ~00~ Page 3 of 6 Operations Summa Report 'Legal Well Name: 04-29 Common Well Name: 04-29AL1 Spud Date: 11/13/1985 Event Name: REENTER+COMPLETE Start: 11/16/2000 End: Contractor Name: NORDIC CALISTA Rig Release: 11/26/2000 Group: COIL Rig Name: NORDIC 1 Rig Number: '- -' ..... ToHours'"':-- ~'"'~' - '"" .... "':' '¥"" ::'~'; ':" ..... :"'"' ..... " '": '"";'"" ' " " ,~ Date . . From -. Task:..,,~,~ Phase .... . ......: Description. of OperatiOns.. '., :......:..... : .. .......... . ........ . ... .... . ... . .. · ..... : 11119/2000 10:15- 10:30 0.25 DRILL PROD1 progress. 10:30 - 12:15 1.75 DRILL PROD1 Pull up hole and tie in to GR log at 12305' while waiting on new mud. Log down to 12360' bit depth. RIH and log RA tag for future tie-ins. Depth correction(+5'). RA marker depth is still 12498'. 12:15 - 12:45 0.50 DRILL PROD1 RIH slow while displacing new mud to bit. 12:45 - 13:00 0.25 DRILL PROD1 Orient around for 90-100L. 13:00 - 14:45 1.75 DRILL PROD1 Tag bottom. Get 1 click. Drill ahead: 12825' 2.6/2.6 bpm. 3630 psi. 106L. 70 fph. Get 1 click at 12827' and drill ahead to 12921'. 14:45 - 16:00 1.25 DRILL PROD1 Get 1 click and continue drilling ahead. 12933'. 2.5/2.5 bpm. 3750 psi.109L. 80 fph. Drill to 13015'. 16:00 - 16:30 0.50 DRILL PROD1 Wiper trip up to window and back to bottom - no problems. 16:30 - 19:00 2.50 DRILL PROD1 Drill ahead 13030'. 2.5/2.5 bpm. 3620 psi. 117L. 80 fph. Get 1 click at 13060'. Drill to 13123'. 19:00- 20:00 1.00 DRILL PROD1 Drill ahead. 2.5/3590197L. Stalled. Drill to 13154'. 20:00 - 20:50 0.83 DRILL PROD1 'Wiper trip to the window. Clean trip 20:50 - 21:10 0.33 DRILL PROD1 Orienting 21:10 - 23:00 1.83 DRILL PROD1 Drill ahead. 2.3/3801126L. Drill to 13253'. 23:00 - 23:50 0.83 DRILL PROD1 Problems with orienter - not getting click for click. 23:50- 00:00 0.17 DRILL PROD1 Drill ahead 2.4/3560/111L. Drill to 13290'. 11/20/2000 00:00 - 01:15 1.25 DRILL PROD1 Drill ahead 2.613950/120L. Drill to 13340'. 01:15-02:25 1.17 DRILL PROD1 Short trip. Clean trip. Orienting 02:25 - 05:00 2.58 DRILL PROD1 Drilling ahead 2.5/370/82R. Drill to 13408'. 05:00 - 06:00 1.00 DRILL PROD1 Drill ahead 2.5/3300/105R. Drill to 13435 06:00 - 07:00 1.00 DRILL PROD1 Continue drilling 2.4/4050/70R. Drill ahead to 13459'. ROP seems Iow and slowing down further & circ pressure is high. Suspect bit is be worn and/or new mud needed. Pyrite previously seen in samples may have damaged bit.. 07:00 - 10:30 3.50 DRILL PROD1 Make MAD pass from TD to window for resistivity data - 300-350 fph. Non-targeted time. 10:30 - 12:30 2.00 DRILL PROD1 POH for bit and orienter change. 12:30 - 15:15 2.75 DRILL PROD1 OOH. Stand back injector. LD orienter and motor. Bit in v. good shape. Will re-run. Download resistivity data. MU new motor (1 deg) and orienter. Upload resistivity tool. MU Injector. 2 Hrs non-targeted resistivity download and programming. 15:15 - 17:30 2.25 DRILL PROD1 RIH with re-run DS49, 1 deg motor, EWR/GR, orienter. 17:30 - 18:55 1.42 DRILL PROD1 Exit window with bit and orient to highside for GR tie-in to RA marker. Make tie-in - correction (-5'). Mud swap. 18:55 - 21:00 2.08 DRILL PROD1 Drilling 2.7/39001120R. Made a click. 2.7/4030/165R 21:00 - 23:00 2.00 DRILL PROD1 Drill ahead 2.713900/142R. Drill to 13557 23:00 - 00:00 1.00 DRILL PROD1 Drilling at 2.6/3800/174R Drill to 13580'. 11/21/2000 00:00 - 01:20 1.33 DRILL PROD1 Drill ahead 2.6/3900/104R. Drill to 13643'. 01:20 - 02:50 1.50~ DRILL PROD1 Short trip. Clean trip to the window. 02:50 - 04:50 2.00 DRILL PROD1 Drill 2.7/3970/78R. Drill to 13719'. 04:50 - 06:00 1.17' DRILL PROD1 Drilling ahead. 2.6/3970/80R. Drill to 13798'. 06:00 - 07:30 1.50 DRILL PROD1 Wiper trip up to window and back to bottom - hole condition good. 07:30 - 07:45 0.25 DRILL PROD1 Orient for 90L. 07:45 - 08:00 0.25 DRILL PROD1 Drill ahead to 13800'. Start orienting all the way around needing to drop angle. Printed: 11/28/2000 8:50:16 AM RECEIVED BP EXPLORATION JAN ~ ~ ~00~Page4of6 Operations summary Report Legal Well Name: 04-29 Common Well Name: 04-29AL1 Spud Date: 11/13/1985 Event Name: REENTER+COMPLETE Start: 11/16/2000 End: Contractor Name: NORDIC CALISTA Rig Release: 11/26/2000 Group: COIL Rig Name: NORDIC 1 Rig Number: ':" '" ' """' '.'..' "' ' ' ' '.Sub" .. ' '" ' '" '"'" ........ Date ' From": To Hours. TaSk 'phase· '." · DeScriPtion. of operatiOns ...... ' .... " :Code . .' ": · . : '.:". ". :' .' · . . .. ... ,. ....... .. . . .. ................... 1112112000 08:00 - 08:45 0.75 DRILL PROD1 Pull up hole into 7" casing per Anch ODE. 08:45 - 09:30 0.75 DRILL PROD1 Wait on decision from Anch on well plugback. 09:30 - 12:00 2.50 DRILL PROD1 POH to test BOPE prior to plugging open hole back for sidetrack. 12:00 - 13:15 1.25 DRILL PROD1 OOH. Stand back injector. LD BHA. 13:15 - 20:00 6.75 BOPSUF PROD1 RU to test BOPE. Test BOPE 20:00 - 20:30 0.50 STKOH PROD1 Load and pump dart thru coil. 20:30 - 21:00 0.50 STKOH PROD1 Wash out in surface return line. Contained in spill dike in cellar. Run hose to possum belly. Continue displacing dart. Bump dart at 57.0 bbls. 21:00 - 21:30 0.50 STKOH PROD1 MU cementing BHA. 21:30 - 00:00 2.50 STKOH PROD1 RIH. Tag TD. Correct to 13800' (-19'). 11/22/2000 00:00 - 00:15 0.25 STKOH PROD1 Safety meeting with cementers. 00:15 - 01:45 1.50 STKOH PROD1 Mix cement. PT lines to 4000 psi. Pump 18 bbls of 13.8 ppg G cement with 8% bent, Chase with mud 3.2 BPM; 3000 psi. With 1 bbl out, lay in cement 1:1 to window. Pull to 12300'. Circ at rain rate for 20 minutes to let cement settle. 01:45 - 02:30 0.75 STKOH PROD1 Wash excess cement to 13250' at 3.0 BPM; 37 FPM. Jet back to window. 02:30 - 04:45 2.25 STKOH PROD1 POOH. 04:45 - 05:00 0.25 STKOH PROD1 LD cementing BHA 05:00 - 06:15 1.25 STKOH PROD1 WO Cement. 06:15 - 07:15 1.00 STKOH PROD1 MU BH^ #6 (M09, 1.4 deg motor, no resistivity). 07:15-09:45 2.50 STKOH PROD1 RIHwith BHA#6. ShallowtestMWDOK. Cont. RIH. 09:45 - 10:10 0.42 STKOH PROD1 Log Tie-in with GR to RA tag at 12,498 ft. [-9 ft CTD] 10:10 - 11:00 0.83 STKOH PROD1 RIH and tag cement plug at 13262 ft. Drill soft cement to 13280 ft. 200 FPH, 100 psi motor work, 100 lb WOB. 11:00 - 11:15 0.25 STKOH PROD1 Orient TF to Iowside to cut trough. 11:15 - 12:45 1.50 STKOH PROD1 Ream and backream, twice from 13280 - 13250 ft. TF 150R. 12:45 - 14:15 1.50 STKOH PROD1 Short trip to window to clean hole. Stacking wt, making slow time drilling difficult. 14:15 - 15:15 1.00 STKOH PROD1 Start time drilling at 13280 ft at 0.1 FPM. 149R TF, 2.7 BPM, 3400 psi. Sidetrack off cement plug at 13,280 ft. 15:15 - 16:30 1.25 STKOH PROD1 Time drill at 0.2 FPM from 13286 - 13291 ft. TF = 143R, 2.5 BPM, 3100 psi to 13291' 16:30 - 18:00 1.50 STKOH PROD1 Drill horizontal sidetrack at 0.5 FPM. TF= 143R, 3220 psi, 2.4 BPM to 13321'. 18:00 - 18:15 0.25 STKOH PROD1 Orient TF to 59R. 18:15 - 19:00 0.75 STKOH PROD1 Drill horizonal hole at 59R, 80 FPH, 2.6 BPM, 3300 psi to 13370'. Inclination at 90 deg. 19:00 - 21:30 2.50 STKOH PROD1 Wiper to window. POOH. 21:30 - 22:00 0.50 STKOH PROD1 LD BHA. 22:00 - 23:30 1.50 STKOH PROD1 MU BHA #7 (DS49, 1.0 deg motor, MWD resistivity). 23:30- 00:00 0.50 STKOH PROD1 RIH 11/23/2000 00:00 - 01:40 1.67 STKOH PROD1 RIH with drilling BHA #7. 01:40 - 02:50 1.17 STKOH PROD1 Log tie-in at RA starting at 12540' E bit depth. RA didn't show up on first pass. Repeat pass. Correct depth (-10'). 02:50 - 03:30 0.67 STKOH PROD1 Orient at 13200' to get TF to right side. RIH at 110R, clean thru sidetrack. Tag TD 13374'. 03:30 - 06:15 2.75 STKOH PROD1 Drill 2.4/3400/90R. Resistivity not working. No backup available. Drill to 13545', stacking here. 06:15 - 07:45 1.50 STKOH PROD1 Wiper trip to window. 07:45 - 08:30 0.75 STKOH PROD1 Drill to 13580 ft. 2.6, 3400, 105R, 60 FPH. Sperry determined that back-up Res. tool was available. Printed: 11/28/2000 8:50:16 AM BP EXPLORATION JAN .Z .~ ~o01page 5 of 6 Operations Summa Report Legal Well Name: 04-29 Common Well Name: 04-29^L1 Spud Date: 11/13/1985 Event Name: REENTER+COMPLETE Start: 11/16/2000 End: Contractor Name: NORDIC CALISTA Rig Release: 11/26/2000 Group: COIL Rig Name: NORDIC I Rig Number: 'Date.. FrOm.To 'HoUrs :..Task.,Sub' Phase '. .... ="l.3~.~nr fi ~f.i _~ .............. '. Code .'... :..?.~__.ip~,on of'Op..r_..on...... 11/23/2000 08:30 - 11:30 3.00 STKOH PROD1 POOH for resistivity tool. 11:30 - 13:00 1.50 STKOH PROD1 Service Sperry resistivity tool. Test and initialize OK. Re-run BHA #7 with 1.0 deg motor and DS49 bit. 13:00 - 15:45 2.75 STKOH PROD1 RIH with BHA #7. 15:45 - 16:00 0.25 STKOH PROD1 Log Tie-in at RA tag at 12498 ft. ~ 16:00 - 17:45 1.75 STKOH PROD1 Log MAD pass with Sperry Resistivity I GR at 170 FPH. Log from 13580 - 13310 ft. 17:45 - 18:00 0.25 STKOH PROD1 RIH to TD. 18:00 - 21:45 3.75 STKOH PROD1 Drill horizontal hole, 2.5 BPM, 3450 psi, TF=100L. Diff stuck 13655'. 'Pulled free. Swap to new mud. Drill to 13780'. 21:45 - 23:00 1.25 STKOH PROD1 Wiper to window. 23:00 - 23:40 0.67 DRILL PROD1 Drill 2.613500/70L to 13837'. 23:40 - 23:50 0.17 DRILL PROD1 Orient to right side. 23:50 - 00:00 0.17 DRILL PROD1 Drill to 13850'. 11/24/2000 00:00 - 00:45 0.75 DRILL PROD1 Drill to 13920'. Fast drilling. Resistivity showing in water again. Discussed with Anch geo. Decided to call it quits. 00:45 - 02:00 1.25 DRILL PROD1 Wiper to window. 02:00 - 02:30 0.50 DRILL PROD1 Log tie-in at PA. Correct depth (+3'). 02:30 - 02:50 0.33 DRILL PROD1 RIH to TD. Tag TD at 13922' corrected. 02:50- 05:15 2.42 DRILL PROD1 POOH 05:15 - 07:45 2.50 DRILL PROD1 LD drilling BHA and download resistivity. 07:45 - 08:15 0.50 CASE PROD1 Safety Meeting with all personnel. Review completion operation and current safety topics. 08:15 - 11:30 3.25 CASE PROD1 M/U 2 7/8" slotted liner and liner. 11:30 - 12:30 1.00 CASE PROD1 RIH with I 114" CSH inside 2 7/8" liner as wash string. 12:30 - 13:30 1.00 CASE PROD1 M/U Baker CTLRT and DS BHA. Pull test with 10K over. 13:30 - 15:50 2.33 CASE PROD1 RIH with 2 7~8" combination slotted liner on CT. RIH to TD clean, 0.5 BPM, 1700 psi, 60 FPM in open hole. Tag TD of 13,935 ft CTD, twice. True TD is 13,922 ft BKB. 15:50 - 16:30 0.67 CASE PROD1 Pump 5/8" steel ball. Liner setting on bottom. 2.1 BPM, 2900 psi. Release from liner OK. Up wt = 36 K. Set back down 8K. 16:30 - 18:15 1.75 CASE PROD1 Circulate 80 bbl. 2% KCL water. Circulate 20 bbls Bleach. Circulate well to 2% KCL water. 2.1 BPM, 3300 psi. Circ. Bleach out nozzle while pulling thru slotted liner. 2.1 BPM. 18:15 - 20:00 1.75 CASE PROD1 POOH while circulating 2 % KCL water. Left Bleach in slotted liner. 20:00 - 20:15 0.25 CASE PROD1 LD CTLRT. 20:15 - 20:45 0.50 CASE PROD1 Safety meeting. 20:45 - 23:00 2.25 CASE PROD1 LD CSH in singles. Well is drinking. 23:00 - 00:00 1.00 CASE PROD1 MU nozzle. RIH to 2000'. FP well with 16 bbls MeOH (3 to 1 up to 1000'; 2 to 1 up to 500'; 1 to 1 from 500' to surface). 11/25/2000 00:00 - 00:30 0.50 CASE PROD1 Finish freeze protecting well from 2000' to surface with MeOH. 00:30 - 20:30 20.00 CASE OTHR PROD1 Rig standby while waiting on N2 to blowdown reel. N2 Unit is at Milne Pt. on job. Also, high winds preventing derrick down operations. 20:30 - 23:00 2.50 CASE PROD1 RU hardline. Blowdown reel. Bleed coil. 23:00 - 00:00 1.00 CASE PROD1 ND BOPE. 11/26/2000 00:00 - 01:00 1.00 BOPSUF PROD1 Finish ND BOPE. NU and PT tree cap. Release rig 01:00 hrs 11/26/00. Printed: 11/28/2000 8:50:16 AM ' __ Page6 of 6 BP EXPLORATION JAN .Z .[ .~OO1 Operations Summary Report 4/~a~l&p~co.~. ~__~: Legal Well Name: 04-29 Common Well Name: 04-29^L1 Spud Date: 11/13/1985 Event Name: REENTER+COMPLETE Start: 11/16/2000 End: Contractor Name: NORDIC CALISTA Rig Release: 11/26/2000 Group: SLIC Rig Name: NORDIC 1 Rig Number: '. · . Sub'...phase . ..: .. . · · . . ... Date. '.From - To Hours' Task Code '.: . :..: .. .'...'.;.' .Description of.Operations .. '..... -.: ... 11116/2000 09:00 - 09:45 0.75WHSUR PROD1 Latch on to BPV with polished rod and pull same. 750 psi below BPV on tubing , Printed: 11/28/2000 8:50:16 AM J~N1 1 ~ ZOO1 ~ Alaska Oil & Ge~ Cons ~: Anchor~ C°n3n~ission ~ 0 ZZZZZ ZZZZZ ZZZZZ ~~g ~ ooooo ooooo ooooo  wwwww wwwmw wwwww Commission zzzzz zzzzz 0~~ 0~~ 00000 ~~ 00000 00000 Sperry-Sun Drilling Services Survey Report for 04-29 - 4-29A L1 pbf Your Reft APl 500292145370 Surveyed: 21 November, 2000 North Slope Alaska Measured Depth (ft) 13056.16 13093.16 13122.16 13151.96 13181.76 13222.56 13256.76 13293.96 13324.76 13352.76 13382.96 13411.76 13454.56 13480.56 13511.16 Incl. 90.750 89.960 91.010 93.740 92.070 91.190 91.010 9O.O4O 90.040 92.160 93.300 93.180 93.570 96.390 94.540 91.280 89.870 89.780 88.810 89.340 13542.36 13569.56 13600.76 13634.56 13662.76 Azim. Sub-Sea Depth (ft) Vertical Depth (ft) Local Coordinates Northings Easfings (ft) (ft) 21.070 8815.14 8875.24 716.68 S 8132.03 E 16.310 8814.91 8875.01 681.64S 8143.88 E 13.140 8814.66 8874.76 653.60 S 8151.25 E 9.080 8813.43 8873.53 624.39 S 8156.99 E 6.090 8811.92 8872.02 594.89 S 8160.92 E 1.150 8810.76 8870.86 554.21S 8163.49 E 357.450 8810.10 8870.20 520.02 S 8163.07 E 351.290 8809.76 8869.86 483.02 S 8159.43 E 346.880 8809.74 8869.84 452.78 S 8153.60 E 346.180 8809.20 8869.30 425.56 S 8147.08 E 349.700 8807.76 8867.86 396.07 S 8140.77 E 353.810 8806.13 8866.23 367.62 S 8136.65 E 354.110 8803.61 8863.71 325.13 S 8132.15 E 359.040 8801.36 8861.46 299.28 S 8130.61E 1.510 8798.44 8858.54 268.83 S 8130.75 E 1.860 8796.86 8856.96 237.68 S 8131.67 E 2.920 8796.58 8856.68 210.51S 8132.80 E 6.260 8796.68 8856.78 179.41S 8135.30 E 11.200 8797.10 8857.20 146.02 S 8140.43 E 14.370 8797.55 8857.65 118.53 S 8146.67 E 13693.56 89.780 18.070 8797.79 8857.89 13722.36 89.160 19.830 8798.05 8858.15 13752.76 89.430 22.480 8798.43 8858.53 13779.76 91.190 24.590 8798.28 8858.38 13802.00 91.190 24.590 8797.82 8857.92 88.96 S 8155.27 E 61.72 S 8164.62 E 33.37 S 8175.59 E 8.62 S 8186.37 E 11.60 N 8195.62 E Global Coordinates Northings Eastings (ft) (ft) 5951139.58 N 721489.62 E 5951174.94N 721500.47 E 5951203.18 N 721507.05 E 5951232.54N 721511.95 E 5951262.13 N 721515.04 E 5951302.88 N 721516.46 E 5951337.04 N 721515.07 E 5951373.92 N 721510.38 E 5951403.98 N 721503.69 E 5951431.01N 721496.40 E 5951460.31N 721489.27 E 5951488.63 N 721484.34 E 5951530.98 N 721478.64 E 5951556.77 N 721476.36 E 5951587.22 N 721475.65 E 5951618.37 N 721475.68 E 5951645.57 N 721476.04E 5951676.72 N 721477.66 E 5951710.25 N 721481.84 E 5951737.91N 721487.29 E 5951767.71N 721495.05 E 5951795.20 N 721503.63 E 5951823.84N 721513.79 E 5951848.89 N 721523.86 E 5951869.36 N 721532.54 E Dogleg Rate (°/'~OOft) 16.64 13.04 11.51 16.41 11.48 12.29 10.83 16.76 14.32 7.97 12.24 14.25 1.15 21.78 10.06 10.51 6.49 10.71 14.89 11.40 12.10 6.48 8.76 10.18 0.00 Alaska Drilling & Wells PBU_EOA DS 04 Vertical Section Comment 3379,34 3415.67 3443.71 3471.96 3499.57 3536.25 3565.80 3596.21 3619.66 3640.15 3662.72 3685.45 3720.22 3741.96 3768.54 3796.10 3820.31 3848.61 3880.20 3907.20 3937.17 3965.49 3995.56 4022.41 4044.57 Projected Survey Continued,.. ... DrillQuest 2.00.05 6 December, 2000 - f7:3f - 3. Sperry-Sun Drilling Services Survey Report for 04-29 - 4.29A L1 pbl Your Ref: AP1500292145370 Surveyed: 21 November, 2000 North Slope Alaska Alaska Drilling & Wells PBU EOA DS 04 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 27.049° (16-Nov-00) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well Reference and calculated along an Azimuth of 29.490° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13802.00ft., The Bottom Hole Displacement is 8195.63ft., in the Direction of 89.919° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (rt) (ft) Comment 12388.64 8851.97 980.69 s 7586.74 E Tie in Point 12488.00 8880.42 993.36 S 7680.87 E KOP 12521.16 8885.41 994.70 S 7713.60 E Int. Az 12550.96 8888.27 993.90 S 7743.25 E Int. Az 12580.16 8890.81 991.30 S 7772.22 E Int. Az 12610.16 8892.77 986.76 S 7801.80 E Int. Az 12646.96 8893.76 978.64 S 7837.67 E Int. AZ 12678.96 8893.69 969.35 S 7868.28 E Int. AZ 12713.76 8892.83 956.96 S 7900.78 E Int. Az Confint~ed... DrillQuest 2.00.05 6 December, 2000 - 17:31 - 4 - Sperry-Sun Drilling Services Survey Report for 04-29 - 4-29A Lf pbl Your Ref: APl 500292145370 Surveyed: 21 November, 2000 North Slope Alaska Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comments (Continued) Comment Alaska Drilling & Wells PBU EOA DS 04 13802.00 8857.92 11.60 N 8195.62 E Projected Survey Survey tool program for 04-29 - 4-29A L f pbf From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0.00 10208.41 7259.41 10208.41 7259.41 13802.00 8857.92 Survey Tool Description Good Gyro MWD Magnetic 6 December, 2000 - 17:31 - 5 - DrillQuest 2.00.05 North Slope Alaska Alaska Drilling & Wells PBU_EOA DS 04, Slot 04-29 04-29 - 4-29A L1 Surveyed: 24 November, 2000 SURVEY REPORT 6 December, 2000 Your Reft APl 500292145360 Surface Coordinates: 5951625.46 N, 713340.54 E (70° 16' 14.8909" N, 148° 16' 27.9715" HO Kelly Bushing: 60. lOft above Mean Sea Level DRILLING SERVICES A Halliburton Company Survey Ref: svy10650 North Slope Alaska Sperry-Sun Drilling Services Survey Report for 04-29 - 4-29A L1 Your Ref: AP1500292145360 Surveyed: 24 November, 2000 ~' Alaska Drilling & Wells PBU EOA DS O4 Measured Depth fit) Incl, Azim, Sub-Sea Depth (ft) Vertical Depth (ft) 13256.76 91.010 357.450 8810.10 8870.20 13280.00 90.390 353.580 8809.82 8869.92 13308.98 85.930 357.470 8810.75 8870.85 13347.18 88.110 2.740 8812.73 8872.83 13373.55 88.900 5.740 8813.42 8873.52 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) 520.02 S 8163.07 E 5951337.04 N 721515.07 E 3565.80 496.86 S 8161.26 E 5951360.14 N 721512.60 E 16.86 3585.07 467.99 S 8159.00 E 5951388.93 N 721509.52 E 20.41 3609.08 429.86 S 8159.07 E 5951427.05 N 721508.51 E 14.91 3642.31 403.58 S 8161.02 E 5951453.38 N 721509.72 E 11.76 3666.15 Comment Tie on Point KOP(Open Hole ST) 13400.38 89.690 8.910 8813.75 8873.85 13434.38 92.160 15.070 8813.20 8873.30 13469.98 91.370 17.720 8812.11 8872.21 13503.98 91.190 21.240 8811.35 8871.45 13533.58 92.070 24.590 8810.50 8870.60 376.97 S 8164.44 E 5951480.07 N 721512.38 E 12.18 3690.99 343.74S 8171.50 E 5951513.49 N 721518.50 E 19.52 3723.39 309.60 S 8181.54 E 5951547.90 N 721527.57 E 7.76 3758.05 277.56 S 8192.87 E 5951580.25 N 721537.99 E 10.36 3791.52 250.31S 8204.39 E 5951607.8! N 721548.73 E 11.70 3820.91 13572.74 92.160 21.770 8809.06 8869.16 13601.74 90.750 20.010 8808.32 8868.42 13636.14 88.720 14.720 8808.48 8868.58 13670.34 88.810 7.850 8809.22 8869.32 13702.94 90.310 5.560 8809.47 8869.57 214.34 S 8219.79 E 5951644.20 N 721563.11E 7.20 3859.80 187.26 S 8230.13 E 5951671.57 N 721572.67 E 7.77 3888.46 154.44 S 8240.39 E 5951704.66 N 721582.00 E 16.47 3922.08 120.93 S 8247.08 E 5951738.35 N 721587.73 E 20.08 3954.54 88.56 S 8250.88 E 5951770.82 N 721590.62 E 8.40 3984.59 13733.94 91.720 4.330 8808.92 8869.02 13767.74 91.100 356.400 8808.09 8868.19 13800.34 91.190 351.990 8807.44 8867.54 13831.74 94.010 350.760 8806.01 8866.11 13866.34 96.120 353.050 8802.96 8863.06 57.68 S 8253.56 E 5951801.76 N 721592.41 E 6.04 4012.79 23.92S 8253.77 E 5951835.52 N 721591.67 E 23.53 4042.28 8.50 N 8250.48 E 5951867.83 N 721587.46 E 13.53 4068.88 39.51 N 8245.77 E 5951898.69 N 721581.88 E 9.80 4093.55 73.63 N 8240.92 E 5951932.66 N 721576.06 E 8.98 4120.86 13899.74 97.800 357.100 8798.91 8859.01 13922.00 97.800 357.100 8795.89 8855.99 6 December 2000-17:31 106.65 N 8238.07 E 5951965.59 N 721572.28 E 13.04 4148.20 128.68 N 8236.95 E 5951987.57 N 721570.54 E 0.00 4166.83 -2- Projected Survey Continued... DrillQuest 2,00,05 Sperry-Sun Drilling Services Survey Report for 04.29 - 4-29A L Your Ref: AP1500292145360 Surveyed: 24 November, 2000 North Slope Alaska Alaska Drilling & Wells PBU EOA DS 04 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 27.049° (16-Nov-00) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well Reference and calculated along an Azimuth of 29.490° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13922.00ft., The Bottom Hole Displacement is 8237.96ft., in the Direction of 89.105° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 13256.76 8870.20 520.02 S 8163.07 E 13280.00 8869.92 496.86 S 8161.26 E 13922.00 8855.99 128.68 N 8236.95 E Tie on Point KOP(Open Hole ST) Projected Survey Continued... 6 December, 2000 - 17:31 - 3 - DrillQuest 2.00.05 Sperry-Sun Drilling Services Survey Report for 04-29 - 4.29A L f Your Ref: AP1 $00292f45360 Surveyed: 24 November, 2000 North Slope Alaska Alaska Drilling & Wells PBU EOA DS 04 Survey tool program for 04-29 - 4-29A L f From To Measured Vertical Measured Depth Depth Depth {ft) (ft) (ft) Vertical Depth (ft) 0.00 0.00 10208.4'1 7259.41 10208.41 7259.41 13922.00 8855.99 Survey Tool Description Good Gyro MWD Magnetic 6 December, 2000 - 17:31 - 4 - DrillQuest 2.00.05 07-Dec-00 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 4-29AL1 PB1 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: 12,388.64' MD Window / Kickoff Survey: 12,488.00' MD Projected Survey: 13,802.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 07-Dec-00 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 4-29AL1 .Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: 13,256.76' MD Window / Kickoff Survey: 13,280.00' MD Projected Survey: 13,922.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ALASiIA OIL AND GAS CONSERVATION COI~I~ISSION Ted Stagg CT Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 1996612 Anchorage, AK 99519-6612 TONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Prudhoe Bay Unit 04-29AL1 BP Exploration (Alaska), Inc. Permit No: 200-178 Sur Loc: 261' SNL, 503' EWL, Sec. 35, T1 IN, R15E, UM Btmhole Loc. 17' SNL, 3534' EWL, Sec. 36, TI IN, R15E, UM Dear Mr. Stagg: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The permit is for a new wellbore segment of existing well 04-29A, Permit No 195-172, APl 50-029-21453-01. Production should continue to be reported as a function of the original API number stated above. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Daniel T.: Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this ~¥,n' day of November, 2000 ljt/Enclosures cc: Department of Fish & Game, Habitat Section w/o en¢l. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASK{ '~ )IL AND GAS CONSERVATION coM[l $SION PERMIT TO DRILL 20 AAC 25.005 I [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work I~ Drill ~ Redrill lb. Type of well Re-Entry [] Deepen Service Development Gas Single Zone Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 60.10' Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028324 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 2o AAC 25.025) 261' SNL, 503' EWL, SEC. 35, T11N, R15E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 1238' SNL, 2769' EWL, SEC. 36, T11 N, R15E, UM 04-29AL1 Number 2S100302630-277 At total depth 9. Approximate spud date 17' SNL, 3534' EWL, SEC. 36, T11N, R15E, UM 11/13/00 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028343, 1745' MDI No Close Approach 2560 14090' MD / 8780' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 12500' MD Maximum Hole Angle 92 ° Maximum surface 2309 psig, At total depth (TVD) 8800' ! 3365 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casin,q Wei,qht Grade Couplin,q Len,qth MD TVD MD TVD (include sta,qe data) 3-3/4" 2-7/8" 6.16# L-80 ST-L 1880' 12210' 8702' 14090' 8780' Uncemented Slotted Liner ,..,.. ,..,,,... ~; ,, ~? /~!..~ ~.,~ ",, 19. To be completed for Redrill, Re-entry, and Deepen Operations. '" ~'~'':'' Present well condition summary~.~.... ~..::......-...,,. ~: Total depth: measured 13870 feet Plugs (measured) ...... ~-'~;'~ ~:~ ~'.:? ....... true vertical 8877 feet ~' .-~,..~., Effective depth: measured 13870 feet Junk (measured) Fish: 1" Integral Latch at 13865' (1996) "' true vertical 8877 feet Casing Length Size Cemented MD TVD Structural Conductor 120' 20" 1830# Polyurethane 120' 120' Surface 2550' 13-3/8" 2500 sx AS III, 400 sx AS II, 101 sx AS I 2550' 2511' Intermediate 10143' 9-5/8" 500 sx Class 'G' 10174' 7239' Production Liner 2659' 7" 500 sx Class 'G' 9969' - 12628' 7124' - 8895' Liner 1329' 4-1/2" Uncemented Slotter Liner 12541' - 13870' 8889' - 8877' Perforation depth: measured Slotted Liner: 12628' - 13827' Add Perf: 12492' - 12530' ORIGINAl_ true vertical Slotted Liner: 8895' - 8877' Add Perf: 8881'-8888' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubble, 564-4628 2i. I hereby certify that the forego~g,/is true and correct to the best of my knowledge Signed Ted Stagg ~, ~,~' Title CT Drilling Engineer Date Permit Number APl Number /~ppr~val Date See cover letter ~- / '~__.> 50- 029-21453-60 (I/~/O'0 for other requirements Conditions of Approval: Samples Required [] Yes ~ No Mud Log R~quired [] Yes I~ No Hydrogen Sulfide Measures ~ Yes [] No Directional Survey Required I~ Yes [] No Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K ~!.3.5K psi for CTU Other: ORIGINAL SIGNED BY by order of / /O'~ Approved By r3 m~vlnr -q~_amoHnt Commissioner the commission Date { ( Form 10-401 Rev. 12-01-85 Submit In Triplicate ObP To: Tom Maunder Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Ted Stagg CTD Engineer Date: Oct. 26, 2000 Re: Well 04-29aL1 Well 04-29a is scheduled for a through tubing sidetrack with the Schl./Nordic coil drilling rig. The sidetrack, 04- 29aL1, will kick off from a window milled from a mechanical whipstock to be set in the Zone 1 interval of 04-29a. The 04-29aL1 target is lower Zone 1 to the west of 04-29a. The following describes work planned to prep 04- 29a for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack completion is attached for reference. 1. GLM's will be dummied off, the IA liquid packed and tested to 2500 psi. 2. Wellhead seals will be tested for integrity. 3. A dummy whipstock drift will be run to whipstock depth. 4. CTE-Line will set a mechanical whipstock at approx. 10,490' MD in the 7" liner. 5. No abandonment work will be done as the existing slotted liner will be retained to produce along with the sidetrack. CTE-Line is scheduled to set the whipstock on 11/6/00. Drilling coil is scheduled to move onto the well for milling/drilling on Nov. 13, 2000. Ted Stagg CTD Drilling Engineer CC: Well File Petrotechnical Data Center (' bp 04-29aL1 Sidetrack Summary of Operations: 04-29a is a Zone I horizontal slotted liner producer that suffers from Iow rate. The sidetrack, 04-29aL1 will exit the 7" just above the 4 ½" slotted liner and target Zone I sands to the west of the 04-29a completion. A flow-through whipstock will be used in order to retain production from the 04-29a slotted liner. This sidetrack will be conducted in two phases. Phase 1: Drift, set whipstock on CTE-Line. Planned for Nov. 6, 2000. · The IA will be loaded and pressure tested. · A dummy whipstock drift will be run. · CTE-Line will set the whipstock at approx. 12,490' MD (8820ss). Phase 2: Mill window, Drill and Complete sidetrack: Planned for Nov. 13, 2000. Drilling coil will be used to mill the window then drill and complete the directional hole as per attached plan. The sidetrack will be completed with a slotted liner. Top of 2 7/8" slotted liner to be approx. 12,210' MD (8702ss). Mud Program: · Phase 1: Seawater · Phase 2: Seawater and FIo-Pro (8.6 - 8.7 ppg) Disposal: · No annular injection on this well ..... · All drilling and completion fluids and all other Class II wastes will go to Grind & InjeCt~'; '? .~ ,:... ~'"i'./'" ;!i.'" i'"~.~, · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 2 7/8" slotted liner will be run from TD to approx. 12,210' MD (8702ss). Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2000 psi. Directional · See attached directional plan. BHL (State Plane): 721,288; 5,952,021. Max. hole angle is 92 deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · An MWD Gamma Ray Icg will be run over all of the open hole section. · A real time Resistivity Log will be run in open hole and a memory CNL wil be run in cased hole. Hazards A 4-29a production test separator sample was measured at 25 ppm H2S on 8/28/98. The maximum H2S measured on test separator samples from DS 4 is 490 ppm on well 04-40 on 9/26/00. Lost circulation risk is Iow. The existing slotted liner will be sealed off with high vis FIo-Pro while drilling the 04-29aL1 sidetrack. Reservoir Pressure Res. press, is estimated to be 3365 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface is 2309 psi. 4-29aL1 Proposed Completion 4.5" 12.6# 13 Cr 9 5/8" window 10,174-10,239 Baker S-3 Pkr @ 12,168' 13 3/8"@ 2550 7"x 5.5" x 4.5" at 30' TRSV @ 2200' 6 Gas Lift Mandrels 34O4' 7312' 9401' 10529' 11194' 11620' 4.5 X Nipple @ 12,242' 4 1/2" WLEG @ 12,254' Top of Whipstock to be set approx. 12,490'. Whipstock has large flow-by area for continued production from existing slotted liner. Top 4 1/2" slotted liner 12,547' 7" 29# 13 Cr liner @ 12,628' 04-29aL1 3 3/4" open hole 2 718" slotted & solid liner 4 1/2" shoe @'13,870' tel M5 Vertical Section 870C 8750 8800 e e ,885C 89O0 8950 9000 04-29A Path Distance (Feet) Angle @ K.O.= 80 deg MD:12500 04-29aL1 case 105 Oct. 17, 2000 500 1,000 1,500 I I I Tot Drld: 1590 ft 14090 TD 2,000 2,500 I I Marker Depths ~:::)rig Wellbore 8835ss TSAD 8,7861 8,7861~ TVD I 8,83~1, 8,7811 8,7811fi.TVD I 8,7151fl TVD IKick Off I 8,8221. lVD 12,500iffMD IDeprtr @KO 7,772 fi' I MD KO Pt 12,500I MD New Hole 1590I I Total MD 14,090 I 1'VD iD 8,78Ol DIS deg/100 Tool Face Length Cuwe 1 ' 6 0 ~0 Curve 2 14 -58 156 Curve 3 14 ' -90 645, Curve 4 14 90 3191 ,Curve 5 14 -90 251 :Curve 6 14 90 199 1,590 Drawn: ######### 10:26 Plan Name: Case 122 1,000 500 o 0 -1,500 6,500 04-29A 04-29aL1 Case 105 Oct. 17, 2000 Ted x4694 7,000 7,500 8,000 8,500 9,000 9,500 X distance from Sfc Loc IWell Name 04-29A I CLOSURE iDistance 8,314 fl Az 87 deg NEW HOLE E/W (x) N/S (Y) Kick Off 7,718 -776 TD 8,300 484 State Plane 721,641 5,952,110 Surface Loc 713,341 5,951,626 DI.S deg/100 Tool Face Length Curve ! 6 0 20 Curve 2 14 -58 156 Curve 3 14 -90 645 Curve 4 14 90 319 Curve 5 14 -90 251 Curve 6 14 90 199 1,590 Drawn: ######### 10:26 Plan Name: Case 122 2 3/8" CT i i Pack-Off 04-29aL1 CT Drilling & Completion BOP 12" 22.5"I 18"I 38"I 71/16" Annular 7 1/'16' 5000 psi ~ Blind/Shear 71/16" _ ~--- , Pipe/Slipj ~ ~ 2 3/8" Slips ~ 2 718" 71/16" Pipe ~ 2 3/8" 7 1/16' x 5,000 pal SWAB OR MASTER VALVE / DATE / CHECK NO. H 175144 I I po175144 VENDOR AL~,51~A:5 I A I ! U DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 092600 ~KO926OOH '100. O0 100, O0 PYMT C]MMENTS' PERMIT TO DRILL FEE HANDLI ~0 INST' S/H TERRIE HUBBLE X4628 .~, THE ATTACHED CHECK IS IN PAYMEI~rr FOR ~M$ DESCRIBED ABOVE. ii[e]IIL, I~ ~ 100. OO 1 OO_ OO ~iRS1; ~TIOI~A[-BANI("O.F ASHL:':'AND AN:iAFFILIATE.~F; '::i:::'i '" ' ::"::i:.: .:...'" NA.i~iON.~L.CiTY.B/~iK ..:. :-. - CONSOL D^~ED COMM'~'I~cIA'L.:!ACCOUNT{'i · ' .- '-.- ..::!.:::i:" " -.".: :.CEEVELAND, O~.110 . :-... !.: --.- :! -.. · . ...-: -: ..: .- .. . .. ::....:.:' :..::- "'""F -':?'56-389." :.-." --.!" :i:-'"' 00 17 5144 ":':": 412 PAY .- . TO .The- STATE OF ALASKA-. .--'- ORDER AOOCC .:.:-. " - · O"f' 3OO1 -P OR C UP I NE: ':DR IT-'VE .... .... .. ONE I~iUNDRED'""~ ~/1~.~.~.~.~.~:~.~.~.~.~.~.~.~~~~ US .'DOLLAR " ' " ' --- DATE AMOUNT I / , oo. o0. l . . -.. . NOT V~ID A~ER 120 DAYS ::"~' 'j :;;~. '-.:::..;:: . .-:.: .. . ......... AK 99501 ANCHORACE WELL PERMIT CHECKL!ST COMPANY WELL NAME ~'://---Z.~',~Z-I PROGRAM: exp FIELD & POOL ~.,~/(~ ,/...%'-'~_~ INIT CLASS '~~/ 7~,)./~ GEOL AREA ADMINISTRATION 1. Permit fee attached ....................... (".,~ N N A~,~ DATE 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from ddlling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .... ' ...... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ~ .,~'"O c~ Dsig. DATE GEO...___LOG.~.Y . APPR DATE 27. Choke manifold complies w/APl RP-53 (May 84) ' 28. Work will occur without operation shutdown ........... _(~ N 29. Is presence of H2S gas probable ............ . ..... ~ N 30. Permit can be issued wlo hydrogen sulfide measures~.... 31. Data presented on potential overpressure zones ........ 32. Seismic analysis of shallow gas zones ............. , ~ N 33. Seabed condition survey (if off-shore) ......... ~ ~jit y N 34. Contact name/phone for weekly progress reports~rato'ry only] Y N ANNULAR DISPOSAL35. APPR DATE With proper cementing records, this plan (A) will contain waste in a suitable receivi~... Y N (B) willto surface;n°t contaminate f~eshwater~.;.~-ca~se~ drillings,,,. ' wa/ste.... _~ ~ (C) will not impair mecl)m~~y of the w~,el~ed ~ Y N (D) will not damage pro ' very from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N dev '/ redrll serv wellbore sag V' ann. disposal para req ~-2~ .~(f'~ UNIT# ~//~:)~::~ (~;:) ON/OFF SHORE GEOLOGY: ENGINEERING: UIC/Annuler Comments/Instructions: rtl Z -I "I"- c:~nsoffice\wordian\diana\checklist (rev. 11101//00) Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, informatiOn. of this nature is accumulated' at the end of the file under APPEN. DIXi .. No 'special'effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Tue Feb 05 20:13:09 2002 Reel Header Service name ............. LISTPE Date ..................... 02/02/05 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 02/02/05 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. 429AL1PBl.tapx Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 4-29AL1PB1 500292145370 BP Exploration (Alaska), Inc. Sperry Sun 02-FEB-02 MWD RUN 4 MAD RUN 4 MWD RUN 5 AK-MW-00267 AK-MW-00267 AK-MW-00267 B. JAHN B. JAHN B. JAHN MASKELL / JU MASKELL / JU MASKELL / JU 437 lin 15E 437 503 60.10 .00 .00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) iST STRING 9.625 10174.0 2ND STRING 7.000 12488.0 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE STATED. 2. MWD RUNS 1 - 3 ARE WHIPSTOCK AND DIRECTIONAL ONLY FOR SETTING Page 1 429AL1PBl.tapx ARE NOT PRESENTED. 3. MWD RUNS 4 & 5 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4). 4. GAMMA RAY LOGGED BEHIND CASING TO 12488' MD, 8820' SSTVD 5o DEPTH SHIFTING / CORRECTION OF MWD DATA IS WAIVED PER THE EMAIL MESSAGE OF 11-27-01 FROM D. SCHNOOR OF BP EXPLORATION ALASKA, INC.. MWD DATA CONSIDERED PDC. THIS WELL KICKS OFF FROM 04-29A AT 12488' MD, 8820' SSTVD (TOP OF WHIPSTOCK). ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL DRILLER'S DEPTH REFERENCES. 6. A MADPASS (MAD) WAS PERFORMED WHILE TRIPPING OUT OF THE HOLE AFTER MWD RUN 4. THIS DATA IS PRESENTED AS A TAIL TO THIS LOG. 7. MWD RUNS 4 & 5 REPRESENT WELL 04-29AL1PB1 WITH API 9 50-029-21453-70. THIS WELL REACHED A TOTAL DEPTH OF 13802' MD, 8798' SSTVD. SROP = SMOOTHED RATE OF PENETRATION SGRC = SMOOTHED GAMMA RAY COMBINED SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( EXTRA SHALLOW SPACING ) SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( SHALLOW SPACING ) SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( MEDIUM SPACING ) SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( DEEP SPACING ) SFXE = SMOOTHED FORMATION EXPOSURE TIME CURVES WITH THE EXTENSION "M" ARE MEASURED AFTER DRILLING (MAD) $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 12460.5 13756.0 RPX 12478.0 13767.5 RPS 12478.0 13767.5 RPM 12478.0 13767.5 RPD 12478.0 13767.5 ROP 12506.5 13802.5 FET 12506.5 13767.5 $ BASELINE CURVE FOR SHIFTS: Page 2 429AL1PBl.tapx CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 4 12460.5 13472.5 MWD 5 13423.5 13802.5 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 ,liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HR 4 1 68 28 8 Name Service Unit Min Max Mean Nsam DEPT FT 12460.5 13802,5 13131.5 2685 ROP MWD FT/H 8.44 2817.95 76.7852 2593 GR MWD API 34.12 152.51 49.9829 2592 RPX MWD OHMM 0.32 1700.9 13.0561 2580 RPS MWD OHMM 0.16 1968.4 15.0972 2580 RPM MWD OHMM 0,11 2000 24.9585 2580 RPD MWD OHMM 0.1 2000 22.0917 2580 FET MWD HR 0.29 13.96 1,50364 2523 First Reading For Entire File .......... 12460.5 Last Reading For Entire File ........... 13802.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 First Reading 12460.5 12506,5 12460.5 12478 12478 12478 12478 12506.5 Last Reading 13802.5 13802.5 13756 13767.5 13767.5 13767.5 13767.5 13767.5 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Page 3 429AL1PBl.tapx Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 12493.5 13426 0 RPX 12504.0 13435 0 RPS 12504.0 13435 0 RPM 12504.0 13435 0 R?D 12504.0 13435 0 FET 12509.5 13435 0 RAT 12537.5 13472 5 $ MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MWD 4 0 12460.5 13472.5 $ REMARKS: MERGED MAD PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RAT MAD FT/H 4 1 68 4 2 GR MAD API 4 1 68 8 3 RPX MAD OHMM 4 1 68 12 4 RPS MAD OHMM 4 1 68 16 5 RPM MAD OHMM 4 1 68 20 6 RPD MAD OHMM 4 1 68 24 7 FET MAD HR 4 1 68 28 8 Name Service Unit Min Max Mean Nsam DEPT FT 12493.5 13472.5 12983 1959 RAT MAD FT/H 4.54 553.48 351,641 1871 GR MAD API 30.22 126.73 49.6388 1866 RPX MAD OHMM 4.45 18.39 9.31199 1863 RPS MAD OHMM 4.96 17.71 9.68511 1863 RPM MAD OHMM 5.14 17.05 9.97637 1863 RPD MAD OHMM 6.07 18.28 11.0728 1863 FET MAD HR 1.51 33.86 18.1867 1852 First Reading For Entire File .......... 12493.5 Last Reading For Entire File ........... 13472.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record,.65535 Page 4 First Reading 12493.5 12537.5 12493.5 12504 12504 12504 12504 12509.5 Last Reading 13472.5 13472.5 13426 13435 13435 13435 13435 13435 File Type ................ LO Next File Name ........... STSLIB.003 429AL1PBl.tapx Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12460 5 13423.0 RPX 12478 0 13432 0 RPD 12478 0 13432 0 RPS 12478 0 13432 0 RPM 12478 0 13432 0 FET 12506 5 13432 0 ROP 12506 5 13469 0 $ LOG HEADER DATA DATE LOGGED: 20-NOV-00 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05 DOWNHOLE SOFTWARE VERSION: 4,27 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13469,0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 84.2 MAXIMUM ANGLE: 93.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB01710RF3 EWR4 ELECTROMAG. RESIS. 4 PB01710RF3 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.750 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.70 MUD VISCOSITY (S): .0 MUD PH: 9.3 MUD CHLORIDES (PPM): 23500 FLUID LOSS (C3): 5.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .120 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .054 160.0 MUD FILTRATE AT MT: .130 68.0 MUD CAKE AT MT: .150 68.0 NEUTRON TOOL MATRIX: Page 5 MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 ,liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type,..0 Name Service Order 429AL1PBl.tapx Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HR 4 1 68 28 8 Name Service Unit Min Max DEPT FT 12460,5 13469 ROP MWD040 FT/H 8,44 2817.95 GR MWD040 API 36.13 152.51 RPX MWD040 OHMM 0,32 1700,9 RPS MWD040 OHMM 0,16 1968,4 RPM MWD040 OHMM 0.11 2000 RPD MWD040 OHMM 0.1 2000 FET MWD040 HR 0,29 5.6 Mean Nsam 12964,8 2018 80.9059 1926 49,5411 1926 14,5873 1909 17.2111 1909 30,4171 1909 26.2457 1909 1,10952 1852 First Reading For Entire File .......... 12460.5. Last Reading For Entire File ........... 13469 File Trailer Service name ............. STSLIB,003 Service Sub Level Name,,, Version Number ........... 1,0,0 Date of Generation ....... 02/02/05 Maximum Physical Record,,65535 File Type ................ LO Next File Name ........... STSLIB,004 First Reading 12460,5 12506,5 12460.5 12478 12478 12478 12478 12506,5 Last Reading 13469 13469 13423 13432 13432 13432 13432 13432 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name,,. Version Number ........... 1,0,0 Date of Generation ....... 02/02/05 Maximum Physical Record,,65535 File Type ................ LO Previous File Name ....... STSLIB,003 Comment Record FILE HEADER FILE NUMBER: Page 6 429AL1PBl.tapx RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: ,5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13423.5 13756 0 RPD 13432.5 13767 5 RPM 13432,5 13767 5 RPS 13432,5 13767 5 RPX 13432.5 13767 5 FET 13432,5 13767 5 ROP 13469,5 13802 5 $ LOG HEADER DATA DATE LOGGED: 21-NOV-00 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05 DOWNHOLE SOFTWARE VERSION: 4,27 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13802.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 88,8 MAXIMUM ANGLE: 94,5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB01710RF3 EWR4 ELECTROMAG, RESIS. 4 PB01710RF3 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.750 DRILLER'S.CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8,70 MUD VISCOSITY (S): 65,0 MUD PH: 9,4 MUD CHLORIDES (PPM): 23500 FLUID LOSS (C3): 5,6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .120 64.0 MUD AT MAX CIRCULATING TERMPERATURE: ,060 168,0 MUD FILTRATE AT MT: ,130 64.0 MUD CAKE AT MT: .150 64.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Page 7 429AL1PBl.tapx Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 ROP MWD050 FT/H 4 1 68 GR MWD050 API 4 1 68 RPX MWD050 OHMM 4 1 68 RPS MWD050 OHMM 4 1 68 RPM MWD050 OHMM 4 1 68 RPD MWD050 OHMM 4 1 68 FET MWD050 HR 4 1 68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 13423.5 13802.5 ROP MWD050 FT/H 19.25 358,56 GR MWD050 API 34.12 80.59 RPX MWD050 OHMM 3.25 13.55 RPS MWD050 OHMM 3.52 21.27 RPM MWD050 OHMM 3.88 22.52 RPD MWD050 OHMM 6.38 16.39 FET MWD050 HR 0.46 13.96 Mean 13613 64.8864 51.2607 8.69985 9.08343 9.42881 10.2737 2.59143 First Reading For Entire File .......... 13423.5 Last Reading For Entire File ........... 13802.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Nsam 759 667 666 671 671 671 671 671 First Reading 13423 5 13469 5 13423 5 13432 5 13432 5 13432 5 13432.5 13432.5 Last Reading 13802.5 13802.5 13756 13767.5 13767.5 13767.5 13767.5 13767.5 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name.., Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record,.65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 4 MAD PASS NUMBER: 0 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12493.5 RPD 12504.0 RPM 12504.0 RPX 12504.0 RPS 12504.0 FET 12509.5 RAT 12537.5 $ LOG HEADER DATA DATE LOGGED: STOP DEPTH 13426.0 13435.0 13435.0 13435.0 13435.0 13435.0 13472.5 20-NOV-00 Page 8 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order DEPT FT 4 1 68 RAT MAD040 FT/H 4 1 68 GR MAD040 API 4 1 68 RPX MAD040 OHMM 4 1 68 RPS MAD040 OHMM 4 1 68 RPM MAD040 OHMM 4 1 68 RPD MAD040 OHMM 4 1 68 FET MAD040 HR 4 1 68 429AL1PBl.tapx Insite 4.05 4.27 Memory 13469.0 84.2 93.7 TOOL NUMBER PB01710RF3 PB01710RF3 3.750 Flo Pro 8.70 .0 9.3 23500 5.2 Units Size Nsam Rep Code Offset Channel .120 68.0 .054 160.0 .130 68.0 .150 68.0 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 12493.5 13472.5 RAT MAD040 FT/H 4.54 553.48 Mean Nsam 12983 1959 351.641 1871 Page 9 First Reading 12493,5 12537.5 Last Reading 13472.5 13472.5 GR MAD040 API 30.22 126.73 RPX MAD040 OHMM 4.45 18.39 RPS MAD040 OHMM 4.96 17.71 RPM MAD040 OHMM 5.14 17.05 RPD MAD040 OHMM 6.07 18.28 FET MAD040 HR 1.51 33.86 429AL1PBl.tapx 49.6388 1866 12493.5 13426 9.31199 1863 12504 13435 9.68511 1863 12504 13435 9.97637 1863 12504 13435 11.0728 1863 12504 13435 18.1867 1852 12509.5 13435 First Reading For Entire File .......... 12493.5 Last Reading For Entire File ........... 13472.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 02/02/05 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS ,LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 02/02/05 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File Page 10 Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Tue Feb 05 19:35:38 2002 429ALl.tapx Reel Header Service name ............. LISTPE Date ..................... 02/02/05 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 02/02/05 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: 4-29AL1 500292145360 BP Exploration (Alaska), Inc. Sperry Sun 05-FEB-02 MWD RUN 4 MAD RUN 4 MWD RUN 6 AK-MW-00267 AK-MW-00267 AK-MW-00267 B. JAHN B. JAHN S. LATZ MASKELL / JU MASKELL / JU WHITLOW / MC JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 7 AK-MW-00267 S. LATZ WHITLOW / MC MWD RUN 8 AK-MW-00267 S. LATZ WHITLOW / MC 35 lin 15E 437 540 60.10 .00 .00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 10174.0 7.000 12488.0 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING Page 1 REMARKS: 429ALl.tapx 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE STATED. 2. MWD RUNS 1 - 3 ARE DIRECTIONAL ONLY FOR SETTING WHIPSTOCK AND ARE NOT PRESENTED. 3. MWD RUNS 4 & 8 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4). 4. MWD RUN 6 IS DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 5. MWD RUN 7 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER MUELLER TUBE DETECTORS. 6. GAMMA RAY LOGGED BEHIND CASING TO 12488' MD, 8820' SSTVD 7. RESISTIVITY DATA WAS OBTAINED TO FILL IN THE MISSING RESISTIVITY OVER THE INTERVAL OF MWD RUNS 6 & 7 ON A WIPE OUT OF THE HOLE ON MWD RUN 8 PRIOR TO DRILLING. 8. DEPTH SHIFTING / CORRECTION OF MWD DATA IS WAIVED PER THE EMAIL MESSAGE OF 11-27-01 FROM D. SCHNOOR OF BP EXPLORATION ALASKA, INC.. 4-29AL1 IS TIED INTO A-29AL1PB1 AT THE KICKOFF POINT. THIS WELL KICKS OFF FROM 4-29A AT 12488' MD, 8820' SSTVD (TOP OF WHIPSTOCK THIS WELL KICKS OFF FROM 4-29ALiPB1 AT 13280' MD, 8810' SSTVD. MWD DATA CONSIDERED PDC. ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL DRILLER'S DEPTH REFERENCES. 9. A MADPASS (MAD) WAS PERFORMED WHILE TRIPPING OUT OF THE HOLE AFTER MWD RUN 4. THIS DATA IS PRESENTED AS A TAIL TO THIS LOG. 10. MWD RUNS 4, & 6 - 8 REPRESENT WELL 4-29AL1 WITH API $ 50-029-21453-60. THIS WELL REACHED A TOTAL DEPTH OF 13922' MD, 8796' SSTVD. SROP = SMOOTHED RATE OF PENETRATION SGRC = SMOOTHED GAMMA RAY COMBINED SGRD = SMOOTHED GAMMA RAY SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( EXTRA SHALLOW SPACING ) SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( SHALLOW SPACING ) SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( MEDIUM SPACING ) SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( DEEP SPACING ) SFXE = SMOOTHED FORMATION EXPOSURE TIME CURVES WITH THE EXTENSION "M" ARE MEASURED AFTER DRILLING (MAD) $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Page 2 429ALl.tapx Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 12460.5 RPX 12478.0 RPS 12478.0 RPM 12478.0 RPD 12478.0 ROP 12506,5 FET 12506.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ REMARKS: STOP DEPTH 13876 5 13888 0 13888 0 13888 0 13888 0 13923 5 13888 0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 4 12460.5 13280.0 6 13280.5 13373.0 7 13342.5 13590.0 8 13280.5 13923,5 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 ,liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD API 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HR 4 1 68 Units Size Nsam Rep Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 12460.5 13923.5 ROP MWD FT/H 2.99 938.06 GR MWD API 34.38 152.51 RPX MWD OHMM 0.32 1700.9 RPS MWD OHMM 0.16 1968.4 RPM MWD OHMM 0.11 2000 RPD MWD OHMM 0.1 2000 Mean Nsam 13192 2927 86.8329 2835 52.641 2833 12,902 2821 14.7853 2821 23.8751 2821 21.2228 2821 Page 3 First Reading 12460.5 12506.5 12460.5 12478 12478 12478 12478 Last Reading 13923,5 13923.5 13876.5 13888 13888 13888 13888 FET MWD HR 0.29 89.69 429ALl.tapx 4.24039 2764 First Reading For Entire File .......... 12460.5 Last Reading For Entire File ........... 13923.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 12506.5 13888 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 12493.5 13280.0 RPX 12504 0 13280.0 RPM 12504 0 13280.0 RPD 12504 0 13280.0 RPS 12504 0 13280.0 FET 12509 5 13280,0 RAT 12537 5 13280.0 $ MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MWD 4 0 12460.5 13280.0 $ REMARKS: MERGED MAD PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 RAT MAD FT/H 4 1 68 4 2 GR MAD API 4 1 68 8 3 RPX MAD OHMM 4 1 68 12 4 RPS MAD OHMM 4 1 68 16 5 RPM MAD OHM}{ 4 1 68 20 6 Page 4 RPD MAD OHMM 4 FET MAD HR 4 1 68 1 68 429ALl.tapx · 24 7 28 8 Name Service Unit Min DEPT FT 12493.5 RAT MAD FT/H 211.56 GR MAD API 30.22 RPX MAD OHMM 4.45 RPS MAD OHMM 4.96 RPM MAD OHMM 5,14 RPD MAD OHMM 6.07 FET MAD HR 7.85 Max 13280 553.48 126 73 18 39 17 71 17 05 18 28 33 86 Mean Nsam 12886.8 1574 380.99 1486 49.4309 1574 9.08435 1553 9.49372 1553 9.82081 1553 11.0244 1553 20.8083 1542 First Reading For Entire File .......... 12493.5 Last Reading For Entire File ........... 13280 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 First Reading 12493.5 12537.5 12493.5 12504 12504 12504 12504 12509.5 Last Reading 13280 13280 13280 13280 13280 13280 13280 13280 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO. Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12460.5 13280.0 RPM 12478.0 13280.0 RPD 12478.0 13280.0 RPS 12478.0 13280.0 RPX 12478.0 13280.0 FET 12506.5 13280.0 ROP 12506.5 13280.0 $ LOG HEADER DATA DATE LOGGED: 20-NOV-00 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 4.27 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13280.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 84.2 Page 5 MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS, 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHM_M) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (INI: EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type.,,0 Name Service Order 429ALl,tapx 93,7 TOOL NUMBER PB01710RF3 PB01710RF3 3.750 Flo Pro 8,70 .0 9.3 23500 5,2 Units Size Nsam Rep Code Offset Channel DEPT FT 4. 1 68 ROP MWD040 FT/H 4 1 68 GR MWD040 API 4 1 68 RPX MWD040 OHMM 4 1 68 RPS MWD040 OHMM 4 1 68 RPM MWD040 OHMM 4 1 68 RPD MWD040 OHMM 4 1 68 FET MWD040 HR 4 1 68 .120 68.0 .054 160,0 .130 68.0 ,150 68.0 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 12460,5 13280 ROP MWD040 FT/H 10,1 241,64 GR MWD040 API 36,13 152,51 RPX MWD040 OHMM 0,32 1700,9 RPS MWD040 OHMM 0,16 1968,4 RPM MWD040 OHMM 0.11 2000 RPD MWD040 OHMM 0.1 2000 FET MWD040 HR 0.29 5,6 Mean 12870,3 79,2335 49.3341 15,3032 18,442 34.1385 29.0797 1.05981 Nsam 1640 1548 1640 1605 1605 1605 1605 1548 First Reading For Entire File .......... 12460,5 Last Reading For Entire File ........... 13280 Page 6 First Reading 12460,5 12506,5 12460,5 12478 12478 12478 12478 12506,5 Last Reading 13280 13280 13280 13280 13280 13280 13280 13280 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 429ALl.tapx Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record.,65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: ,5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13280.5 13342.0 ROP 13280.5 13373.0 $ LOG HEADER DATA DATE LOGGED: 22-NOV-00 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 3.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13372.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 87,9 MAXIMUM ANGLE: 90.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP NATURAL GAMMA PROBE 035 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3,750 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.70 MUD VISCOSITY (S): 65.0 MUD PH: 69.0 MUD CHLORIDES (PPM): 22500 FLUID LOSS (C3): 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 140.0 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 Page 7 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 429ALl.tapx Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD060 FT/H 4 1 68 4 2 GR MWD060 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DE?T FT 13280.5 13373 13326,8 186 ROP MWD060 FT/H 2.99 143.26 60.4377 186 GR MWD060 API 38.23 59.89 49.9456 124 First Reading For Entire File .......... 13280.5 Last Reading For Entire File ........... 13373 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record,,65535 File Type ................ LO Next File Name ........... STSLIB.005 First Reading 13280.5 13280.5 13280.5 Last Reading 13373 13373 13342 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name.., Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13342.5 13543.5 Page 8 ROP 13373.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): 13590.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 429ALl.tapx 23-NOV-00 Insite 4.05.5 4.27 Memory 13580.0 85.9 92.2 TOOL NUMBER PB01710RF3 3.750 Flo Pro 8.70 65.0 9.3 24000 5.4 .130 62.0 .000 142.0 .120 60.0 .160 60.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 13342.5 13590 13466.3 496 ROP MWD070 FT/H 18.79 938.06 103.423 434 GR MWD070 API 34.38 84.24 55.0614 403 Page 9 First Reading 13342.5 13373.5 13342.5 Last Reading 13590 13590 13543,5 First Reading For Entire File .......... 13342.5 Last Reading For Entire File ........... 13590 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 429ALl.tapx Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPD 13280.5 13888.0 RPM 13280.5 13888.0 RPS 13280.5 13888.0 RPX 13280.5 13888.0 FET 13280.5 13888.0 GR 13544.0 13876.5 ROP 13590.5 13923.5 $ LOG HEADER DATA DATE LOGGED: 24-NOV-00 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 4.27 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13922.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 88.7 MAXIMUM ANGLE: 97.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB01710RF3 EWR4 ELECTROMAG. RESIS. 4 PB01710RF3 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.750 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.70 Page 10 429ALl.tapx MUD VISCOSITY (S): 65.0 MUD PH: 9.3 MUD CHLORIDES (PPM): 23 FLUID LOSS (C3): 5.4 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .120 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .120 MUD CAKE AT MT: .130 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 ,liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 ROP MWD080 FT/H 4 1 68 GR MWD080 API 4 1 68 RPX MWD080 OHMM 4 1 68 RPS MWD080 OHMM 4 1 68 RPM MWD080 OHMM 4 1 68 RPD MWD080 OHMM 4 1 68 FET MWD080 HR 4 1 68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 65.0 150.0 65.0 65.0 Name Service Unit Min Max DEPT FT 13280.5 13923.5 ROP MWD080 FT/H 24.97 392.16 GR MWD080 API 45,11 73.93 RPX MWD080 OHMM 4.71 16.27 RPS MWD080 OHMM 4.75 15.51 RPM MWD080 OHMM 4.74 15.75 RPD MWD080 OHMM 6.22 15.4 FET MWD080 HR 0.41 89.69 Mean 13602 101.036 59.8214 9.73261 9.95877 10.3285 10.8524 8.28934 First Reading For Entire File .......... 13280.5 Last Reading For Entire File ........... 13923.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Nsam 1287 667 666 1216 1216 1216 1216 1216 First Reading 13280.5 13590.5 13544 13280.5 13280.5 13280.5 13280.5 13280.5 Last Reading 13923.5 13923.5 13876.5 13888 13888 13888 13888 13888 Physical EOF Page 11 429ALl.tapx File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 4 MAD PASS NUMBER: 0 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12493.5 RPD 12504.0 RPM 12504.0 RPS 12504.0 RPX 12504.0 FET 12509.5 RAT 12537.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): STOP DEPTH 13280.0 13280.0 13280.0 13280.0 13280.0 13280.0 13280.0 20-NOV-00 Insite 4.05.5 4.27 Memory 13280.0 84.2 93.7 TOOL NUMBER PB01710RF3 PB01710RF3 3.750 Flo Pro 8.70 .0 9.3 23500 5.2 .120 68.0 .054 160.0 .130 68.0 .150 68.0 Page 12 REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type,..0 Name Service Order 429ALl.tapx Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 RAT MAD040 FT/H 4 1 68 GR MAD040 API 4 1 68 RPX MAD040 OHMM 4 1 68 RPS MAD040 OHMM 4 1 68 RPM MAD040 OHMM 4 1 68 RPD MAD040 OHMM 4 1 68 FET MAD040 HR 4 1 68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 12493.5 13280 RAT MAD040 FT/H 211.56 553.48 GR MAD040 API 30.22 126.73 RPX MAD040 OHMM 4.45 18.39 RPS MAD040 OHMM 4,96 17.71 RPM MAD040 OHMM 5.14 17.05 RPD MAD040 OHMM 6.07 18.28 FET MAD040 HR 7.85 33.86 First Last Mean Nsam Reading Reading 12886.8 1574 12493.5 13280 380.99 1486 12537.5 13280 49.4309 1574 12493.5 13280 9.08435 1553 12504 13280 9,49372 1553 12504 13280 9.82081 1553 12504 13280 11,0244 1553 12504 13280 20.8083 1542 12509.5 13280 First Reading For Entire File .......... 12493.5 Last Reading For Entire File ........... 13280 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/02/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB,008 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 02/02/05 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 02/02/05 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Page 13 429ALl.tapx Physical EOF Physical EOF End Of LIS File Page 14