HomeMy WebLinkAbout200-189Project Well History File Cov~age
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
Organizing
RESCAN
Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
Well History File Identifier
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
BY:
BEVERLY ROBIN VINCENT SHERYt~~INDY
OVERSIZED (Scannable)
[] Maps:
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
Project Proofing
BY:
BEVERLY ROBIN VINCENT SHERY~WINDY
Scanning Preparation x 30 =
BY: BEVERLY ROBIN VINCENT SHER~~/INDY
Production Scanning ·
Stage 1 PAGE COUNT FROM SCANNED FILE: 'J"/
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION:
BY; BEVER~"f(ROBIN.~VINCENTSHERYL MARIA WINDY
Stage 2 IF NO--IN STAGE t, PAGE(S) DISCREP~,~RE
BY~ BEVERLY ROBIN VINCENT SHERYL MARIA WlNy
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES )
FOUND:
NO
YES NO
III IIIIIllllll II
RESCANNEDBY; BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
General Notes or Comments about this file:
DATE:
Is~
Quality Checked
12110102Rev3NOTScanned.wpd
R~GI::IVt:L)
. STATE OF ALASKA _
ALA OIL AND GAS CONSERVATION COM~kth!J 2 7 7007
REPORT OF SUNDRY WELL OFii6Puli~on
1. Operation~ Abandon D Repair Well 0 Plug Perforations D Stimulate D ÄnchGra¡¡e Other D Patch tubing
Performed: Alter Casing D Pull Tubing D Perforate New Pool D Waiver D Time Ëxtension D
Change Approved Program D Opera!. Shutdown D Perforate D Re-enter Suspended Well D
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development P Exploratory 200-1890
3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number:
Anchorage, AK 99519-6612 50-029-22362-60-00
7. KB Elevation (It): 9. Well Name and Number:
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
574 1865 0
o 0 0
15. Well Class after proposed work:
Exploratory Development P
16. Well Status alter proposed work:
Oil P Gas WAG
88.3 KB
8. Property Designation:
ADLO-028264
11. Present Well Condition Summary:
Total Depth measured 14715 feet
true vertical 8951.97 feet
Effective Depth measured 14715 feet
true vertical 8952 feet
Casing Length Size MD
Conductor 110' 20" 91.5# H-40 Surface - 110'
Surface 3193' 10-3/4" 45.5# NT80LHE 35' - 3228'
Production 12587' 7-5/8" 29.7# NT95HS 32' - 12619'
Liner 285' 5-1/2" 17# 13CR80/L-8'12446' 12731 '
Liner 2327' 2-7/8" 6.16# 1-80 12388' - 14715'
Perforation depth:
Measured depth: 12828' - 14680'
True Vertical depth: 8928' - 8953'
-
Tubing: (size, grade, and measured depth)
4-1/2" 12.6#
Packers and SSSV (type and measured depth)
7-5/8"x5-1/2" bkr Itp
7-5/8"x4-1/2" bkr S-3
o
o
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run
Daily Report of Well Operations
Oil-Bbl
327
shut-in
x
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Gary Preble
~
?~-t7;1
PBU P-09L 1
10. Field/Pool(s):
PRUDHOE BAY Field/ PRUDHOE OIL Pool
Plugs (measured) None
Junk (measured) None
TVD
Surface - 110'
35' - 2858'
32' - 8771'
8634' - 8862'
8590' - 8952'
Burst
1490
5210
8180
7740
13450
Collapse
470
2480
5120
6280
13890
-
SCANNED JUL 0 5 2007
-
13cr
Surface - 12452'
12446'
12373'
o
o
RBDMS BFL JUL 0 :1 20D7
Tubing pressure
254
o
Service
WINJ
WDSPL
Title Data Management Engineer
Signature..?,
Phone 564-4944 Date 6/27/2007
Form 10-404 Re ised 04/2n R Is I N, A' l.
,_ .. , c ! ._
tr~l~ s~~r%~/
.
.
P-09Ll
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
6/22/2007 ***P-09L 1 4-1/2" BAKER PATCH - ONE RUN SYSTEM***
WELL SI ON ARRIVAL T/I/O/ = 400/250/0
MI HOLD PJSM RU AND PRESSURE TEST EQUIPMENT TO 3,000 PSI
CONTINUE TO RIG UP. JOB IN PROGRESS
****JOB CONTINUED ON 06/23/07 AWGRS****
6/23/2007 ***CONTINUED FROM 22-JUN-2007***
INITIAL T/I/O 400/250/0. WELL SHUT-IN AT ARRIVAL.
4-1/2" BAKER 45 "KB" STRADDLE PATCH SET ELEMENT TO ELEMENT FROM
12,295-12,310 FT, ACROSS LEAKING GLM AT 12,299 FT ELM.
TOTAL PATCH LENGTH 21.55 FT. TOP OF PATCH 12,294.4 FT ELM, BOTTOM
12,315 FT ELM. TOP ELEMENT TO TOP OF PATCH 1.58 FT. BOTTOM OF
PATCH TO BOTTOM ELEMENT 4.97 FT. PATCH INTERNAL MIN ID = 2.37".
DEVIATION AT PATCH SET 41 DEGREES.
FINAL T/I/O = 400/250/0
****JOB COMPLETE****
FLUIDS PUMPED
BBLS I
~ ~~~:~I
E·~. -", C 1:: B \11 f.: D~".
, "'" o,,,!, k,." ft \ t~ ,,_ ,.,'
Scblumbepger
APR 2 U Z007
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
¡~a. Oil & Gas. Cons. Gomm~
Anm?faga
~oO-/~
Well Job # Log Description Date BL
02-15 11661130 MEM PROD PROFILE 02/25/07 1
U-06B 11469946 MEM PROD PROFILE 02/24/07 1
P-09L 1 11676933 LEAK DETECTION LOG 03/18/07 1
U-12A 11649941 MEM PROD PROFILE 02/17/07 1
Z-32BL 1 11661128 MEM PROD PROFILE 02/19/07 1
L-04 11649945 MEM SPINITEMP/PRESS LOG 02/18/07 1
DS 16-22 11676935 LEAK DETECTION LOG 03/22/07 1
DS 12-31 11594485 LEAK DETECTION LOG 03/23/07 1
DS 07-35 11676932 LEAK DETECTION LOG 03/17/07 1
06-07 11637114 LEAK DETECTION LOG 03/16/07 1
L5-28AL 1 11660526 MEM PROD PROFILE 02/08/07 1
03-33B 11661131 MEM TEMP/PRESS SURVEY 03/01/07 1
Z-19A 11649953 STATIC PRESS & TEMP LOG 03/21/07 1
F-11B 11649954 MEM PROD PROFILE 03/22/07 1
P2-37 A 11628754 MEM DEPTH CONTROL LOG 02/11/07 1
P2-58 11661129 MEM STATIC PRESS SURVEY 02/24/07 1
Y -06A 11628751 MEM INJECTION PROFILE 02/09/07 1
Z-35 11628753 DEPTH CONTROL LOG 02/10/07 1
P2-40 11637320 PROD PROFILE 02/25/07 1
05-20B 11649952 MEM DEPTH DETERMINATION 03/20/07 1
03-36 11649951 MEM STATIC PRESS & TEMP 03/18/07 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
SCANNED APR 2 5 2007
Date Delivered:
é](
04/16/07
NO 4214
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
CD
(
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
MICROFILMED
04/01/05
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc
to~
P~Ez
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
June 12, 2002
MWD Formation Evaluation Logs: P-09L1, AK-MW-00322
P-O9LI:
Digital Log Images'
50-029-22362-60
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVEr;
DEC 2002
Alaska 0~I & Gas Cons. Commission
Anchom~le
WELL LOG TRANSMITTAL
To: State of Alaska April 30, 2002
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7~ Avenue, Suite 100
Anchorage, Alaska
RE: MWD Formation Evaluation Logs P-09L1, AK-MW-00322
1 LDWG formatted Disc with verification listing.
API#: 50-029-22362-60
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Atto: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
rA,\ \..~
· 2002
Alaska Oil l Gas COns. Comn~ission
M~orege
STATE OF ALASKA{ "
ALASK[ .,IL AND GAS CONSERVATION COM~. .... SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 200-189
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22362-60
4. Location of well at surface r-~. ,
~.' .". -. ...... :,--~~, 9. Unit or Lease Name
2417' NSL, 1906' NWL, SEC. 31 T11N, R13E, UM "' · .'":' ;>'. i Prudhoe Bay Unit
At top of productive interval :'
1934' NSL, 5198' WEL, SEC. 25, T11N, R12E, UM :~~ 10. Well Number
At total depth
2263' NSL, 1669' WEL, SEC. 26, T11N, R12E, UU '["-'"'~ ........ ! ' ' ' '
.... ' ................ -~ .!.~ P-09L1
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Sedal No. 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 86.7' ADL 028264
12. Date Spudded 113. DateT. D. Reached114. Date Comp., Susp., or Aband. 115. Water depth, if offshore 1lO. Nc. of Completions
12/25/2000 1/1/2001 1/2/2001 N/A MSL I One
17. Total Depth (MD+TVD) ~ 18. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost
14715 8952 FTI 14715 8952 FTI [] Yes [] NoI (Nipple) 2098' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, CCL, RES
23. CASING, LINER AND CEMENTING RECORD
CASING SETrlNG DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Weld 110' 30" 267 sx Amticset
10-3/4" 45.5# NT80LHE 35' 3228' 13-1/2" 1050 sx CS III, 355 sx Class 'G'
7-5/8" 29.7# NT95HS 32' 12619' 9-7/8" 785 sx Class 'G'
5-1/2" 17# 13CR80/L-80 12446' 12731' 6-3/4" 123 sx Class 'G'
2-7/8" 6.16# L-80 12388' 14715' 3-3/4" Uncemented Slotted Liner
24. Perforations pp. en tq P.roducti.on (M.D+,TVD of Top and 25. TUBING RECORD
Bottom and ~merva~, s~ze aha number)
SIZE DEPTH SET (MD) PACKER SET (MD)
2-7/8" Slotted Liner 4-1/2", 12.6#, 13Cr 12452' 12373'
MD TVD MD TVD ,
12828' - 13271' 8928' - 9006'
14268' - 14680' 8989' - 8953' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
,
.. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
2000' Freeze Protected with 25 Bbls. of MeOH
12730' Set Flow-Through Whipstock
,,
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
January 22, 2001 Gas Lift
Date of Test HOurs Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS'OIL RATIo
2/1 2/2001 8 TEST PERIOD 2108 2689 708 91I 1276
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS'MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of Iithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RECEIVED
FEB 0 ZOO1
Alaska 0il & Gas Cons. Commission
- , , , , Anchoraq~ ,
Form 10-407 Rev. 07-01-80
Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered
Depth Depth and gravity, GOR, and time of each phase.
8875'
Shublik B 12748'
8898'
Shublik C 12780'
8922'
Eileen 12818'
8932'
Sadlerochit 12836'
RECEIVED
Alaska Oil & Gas Cons. Commission
Anchorage
31. List of AttachmentS: Summary of Daily Drilling Reports, Surveys (submitted by Vendor)
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble ~'~~ .~.~ Title Technical^ssistant Date
P-09L1 200-189
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit, .No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
h'EM 27.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
ORIGINAL
Well: P-09L1 Accept: 11/29/00
Field: Prudhoe Bay Spud: N/A
APl: 50-029-22362-60 Release: 12/03/00
Permit: 200-189 CTD Unit: Nordic #1
Date
PRE-RIG WORK
11122/00
Drift tubing w/3.65" whipstock (20'3" long). Locate tubing tail at 12431' SLM + 12 = 12,443' Corrected
ELM. Tag fill at 12856' SLM + 12 = 12868' Corrected ELM. RDMO.
11/24100
MIRU CTU #8. RIH with jet nozzle and perform FCO to hard bottom at 12965' CTMD. Sweep with
Biozan and cimulate bottoms up. Lay in 25 bbl FIo-Pro pill. PUH. IA gas influx to tubing. Unable to tell
if pill is holding. Prep to circulate gas from tubing. RIH, BH SW well on vacuum. Looks like FIo-Pro pill
had no effect. Order more FIo-Pro.
11/25/00
Continued. Fluid pack and freeze protect IA. Pump 30 bbls FIo-Pro. Lay in 15 more bbls and POOH.
Freeze protect tubing.
11/29100 - 12/03/00: Nordic #1 Unsuccessfully tried to set two whipstocks, rig released.
Well: P-09L1 Accept: 12/23/00
Field: Prudhoe Bay Spud: 12/25/00
APl: 50-029-22362-60 Release: 01/02/01
Permit: 200-189 CTD Unit: Nordic #1
~ .: '.ii~ ~ ::..:~' i': i .,; ~ ":: .:i:;.:'..',.: ~ i ; : ~' ~.;'i. ~.- : .:~:.~::;".~. ';.i.~ . ;' ~ ;.~. : i.: '~.: ;:;:;':;. ; ; ~,'~ . : .~ ~,: '.; ~.'::~.
PRE-RIG WORK
12/11/00
Ran PDS caliper to TD at 12817' WLM. Surveyed liner up to tubing. Leave well shut in.
12/21/00
Set whipstock at 12730' with 16.3 deg. To the right RA PIP tag at 12738.9'.
RECEIVED
Alaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORATION Page 1 of 8
FEB 2 0 2001
Operations Summary Report
,~l:a.~k~ Oil & Gas Cons. Commission
Legal Well Name: P-09 Anchorage
Common Well Name: P-09L1 Spud Date: 7/13/1993
Event Name: REENTER+COMPLETE Start: 11/27/2000 End: 1/2/2001
Contractor Name: NORDIC CALISTA Rig Release: 12/3/2000 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
11/27/2000 03:00 - 04:30 1.50 RIGU PRE Finish move to P-Pad. Arrive location 03:00 hrs 11/27/00. Scope up
derrick.
04:30 - 23:30 19.00 RIGU WIND PRE Wait on wind to raise wind walls. Wait on slickline crew to finish prep
on P-09.
23:30 - 00:00 0.50 RIGU WIND PRE Shutdown slickline to give crew rest.
11/28/2000 00:00 - 03:00 3.00 RIGU WIND PRE Wait on slickline prep and wind. Slickline crew resting until morning.
03:00 - 06:30 3.50; RIGU PRE Winds died. Raise wind walls. PU inj. PU and install gooseneck. Stab
pipe.
06:30 - 00:00 17.50 RIGU :OTHR PRE Wait on slickline prep. Pull catcher sub, set test plug in X nipple. Test
tubing and inner annulus to 2200 psi. OK. Reset #5 dummy. Pull XX
plug. RD HES WL
11/29/2000 00:00 - 02:00 2.00 RIGU OTHR PRE I&E disconnect electrical and hydraulics in well house
02:00 - 03:00 1.00 RIGU OTHR PRE FC remove wellhouse
03:00 - 14:00 11.00 RIGU OTHR PRE Blade and shoot grade. Subsidence hole needs gravel. Wait on blade
driver to drive blade to ARCO side to get dump truck, sift and load,
drive back to fill hole, and then drive dump truck back to get the blade
to level up. Didn't get enough gravel. Go get more. Grade. (Two nite
operators, three on days)
14:00 - 14:30 0.50 RIGU PRE Move rig over well.
14:30- 17:00 2.50 BOPSUF PROD1 Accept rig 14:30 hrs. NU BOPE. Spot equip.
17:00 - 00:00 7.00 BOPSUF PROD1 PT BOPE. Witness waived by Blair Wondzell.
11/30/2000 00:00 - 00:30 0.50 BOPSUF PROD1 Fin test BOPE
00:30 - 02:00 1.50 STWHIP PROD1 PU inj. RU dart catcher. Load CT with 2% KCI. Recover dart at 57.5
bbls
02:00 - 03:00 1.00 STWHIP PROD1 PT DS CTC and leaked. Cut off and install new one. PT 35k. PT inner
reel valve and CTC @ 3500 psi
03:00 - 03:15 0.25 STWHIP PROD1 Install cement nozzle assy. PT DS lub assy @ 3500 psi. Open well to
600 psi. IA 0
03:15 - 05:15 2.00 STWHIP PROD1 Liquid pack w/2% KCI water at 5 bpm w! 130 bbls. WHP began incr
from 400 psi to 1000 psi after 60 bbls pumped and IA pressured up to
WHP at the same time and tracked 1/1. Displace CT w/60 bbls used
mud. Pump 50 bbls fresh (very hi vis) FIo Pro mud down kill line.
Displace with used FIo Pro mud to leave hi vis pill at perfs. Final rate
1.0 bpm @ 600 psi WHP
05:15-07:00 1.75 STWHIP PROD1 Monitor SI WHP. ISIP 400 psi, lA460psi. In 45 min WHP 20 psi, lA
380 psi and falling
07:00-07:10 0.17 S'rWHIP PROD1 lAP=270. Fill hole across top. 11 bbls to fill. IAP=400psi.
07:10 - 09:45 2.58 STWHIP PROD1 SD. Leave well open to atm. lAP down to 315 psi. After 30 min, fill
again -- 2 bbls. Continue monitoring well. Losses steady at 6 BPH.
Keep hole full. Call for E-line and whipstock. Check IA. Liquid packed.
09:45 - 10:45 1.00i STWHIP PROD1 Safety/hazard identification meeting with SWS and Baker. Crew
watched orientation video.
10:45 - 13:30 2.75 STWHIP PROD1 RU E-line. Losses have increased to about 8 BPH.
13:30 - 17:00 3.50 STWHIP PROD1 RIH. Set whipstock with top at 12770' (ref BHCS) oriented 5L.
17:00 - 19:00 2.00 STWHIP PROD1 POOH wi E-line. Losses 10 BPH. RDMO SWS
19:00- 19:50 0.83 STWHIP OTHR PROD1 MU window milling BHA
19:50-22:00 2.17 STWHIP OTHR PROD1 RIHw/BHA#1. IA300. Circ at min with partial losses
22:00 - 22:25 0.42 STWHIP OTHR PROD1 Tag XN @ 12444' CTD. Mill XN at 2.5 bpm 2200 psi losing 1.5 bpm in
20 min. Dress up, RIH. IA 1040
22:25 - 22:35 0.17 STWHIP OTHR PROD1 RIH @ 0.4 bpm 1050 psi wi no returns
22:35 - 22:40 0.08 STWHIP OTHR PROD1 Tag WS at 12943' CTD (fell down hole). Did not see wt loss at planned
setting depth
22:40 - 22:50 0.17 STWHIP OTHR PROD1 PUH 42K while cuss n discuss. Will cure losses before trying again
Printed: 1/26/2001 4:31:05 PM
(' RECEIVED
Il
BP EXPLORATION FEB [ 0 Z00iPage 2 of 8
Operations Summary Report &casc°"s'
Anchorage
Legal Well Name: P-09
Common Well Name: P-09L1 Spud Date: 7/13/1993
Event Name: REENTER+COMPLETE Start: 11/27/2000 End: 1/2/2001
Contractor Name: NORDIC CALISTA Rig Release: 12/3/2000 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Task Sub
Code Phase Description of Operations
11/3o/2000 22:50 - o0:00 1.17 STWHIP PROD1 Park at 12400' while wo DS pump truck
1211/2000 00:00 - 03:00 3.00 STWHIP PROD1 Wait on DS cementers. Circ 0.4 bpm/1120 psi/IA 790 with min returns
03:00 - 04:45 1.75 STWHIP PROD1 DS on location. Take on diesel. RU. Mix Instaseal and ship to vac
truck
04:45 - 05:00 0.25 STWHIP PROD1 Safety mtg re: Instaseal job
05:00 - 06:00 1.00 STWHIP PROD1 PT DS @ 3500 psi. Load CT wi 46 bbls Instaseal at 1.2 bpm at
1600-2800 psi at end
06:00 - 06:40 0.67 STWHIP PROD1 Displace at 2.7 bpm/3300 psi with mill @ 12930'. 1.4 bpm returns,
1100 IA. PUH 40K 7'/min after 3 bbls out 2.8/1.8 (~ 3700 psi. Close
choke after 7 bbls returned and immed pressured up. Displ @ 1.5 bpm
2700 psi, 600 WHP. WHP built to 1250 psi max w/IA @ 1390 psi.
With 6 bbls remaining and mill at 12770', bleed off WHP slowly while
PLF and lay in remaining Instaseal. Est WCTOI @ 12400'
06:40 - 08:45 2.08 STWHIP OTHR PROD1 POOH filling from BS
08:45 - 09:30 0.75 STWHIP OTHR PROD1 LD motor/mill. PU 5' stinger and nozzle.
09:30 - 12:30 3.00 STWHIP PROD1 RIH at min rate. Losing about 0.2 BPM
12:30 - 13:30 1.00 STWHIP PROD1 Park at 12400'. Circulate and check losses. 2.0 BPM in and 1.6 BPM
out steady. Started getting gas in returns. SD pumps and check for
flow -- none. Circulate gas thru buster. Continue circulating. 2.6 BPM
in and 2.3 BPM out. Pit losses since RIH = 40 bbls.
13:30 - 14:00 0.50 STWHIP PROD1 Wash wellbore to 12880'. Pull back to 12400' and park. 2.3 BPM in
and 1.9 BPM out.
14:00 - 15:00 1.00 STWHIP PROD1 Mix LCM
15:00 - 16:15 1.25 S'I'WHIP PROD1 Circulate 20 bbls LCM (15 ppb OM, 15 ppb LC, 4 ppb Mix II, 3 ppb
Maxi-seal). Lay in 1:1 from 12940'.
16:15 - 16:40 0.42 STWHIP PROD1 . Pull to safety. Full returns (2.0/2.0). No LCM lost to formation during
job.
16:40 - 16:45 0.08 STWHIP PROD1 SI backside. Pressure well to 500 psi. Holding solid.
16:45 - 17:15 0.50 STWHIP PROD1 Wash out excess LCM to 12800' CTM. POOH washing. Park at 12500'
and check returns. No losses at 2.5 BPM.
17:15 - 19:30 2.25 STWHIP PROD1 POOH jetting excess LCM OOH
19:30 - 20:30 1.00 STWHIP PROD1 LD BHA. Change packoff. MU 3.5" UR w/4.75" blades
20:30 - 22:40 2.17 STWHIP PROD1 RIH wi BHA #3
22:40 - 23:30 0.83 STWHIP PROD1 Open blades. Underream from 12500-12800' CTD 2.5/2.3 bpm 2640
psi. No obstructions, hole was clean
23:30 - 00:00 0.50 STWHIP PROD1 POOH
12/212000 00:00 - 01:05 1.08 STWHIP PROD1 Finish POOH for WS
01:05 - 01:30 0.42 STWHIP PROD1 LD UR assy
01:30 - 09:15 7.75 STWHIP OTHR PROD1 RU SWS and Baker WS assy. RIH and set WS with top at 12775',
oriented 10R. Log off. RIH and tag 12782.5' corrected. Log off. RIH
and tag again. Same depth. POOH. RD E-line.
09:15 - 10:30 1.25 STWHIP OTHR PROD1 Call for blind box to check for whipstock movement. MU 3.65" blind
box, ported XO, 2 jts PH-6, MHA.
10:30- 13:00 2.50 STWHIP OTHR PROD1 RIH.
13:00 - 13:45 0.75 STWHIP OTHR PROD1 Tag whipstock 12790' CTM. Stack 3k. Whipstock fell to 12793' and
stopped. Clean PU. Two repeat tags at this depth, then whipstock fell
to 12802' CTM. No further movement. Stacked up to 8k. 5k overpulls
(pinch point). Using 12790' CTM = 12782' ELMD, then corrected
whipstock top now is 12794' and bottom is 12806' (total movement
since setting is 19').
13:45- 15:45 2.00 STWHIP OTHR PROD1 POOH.
15:45 - 16:15 0.50 STWHIP PROD1 LD blind box. Marks show top of whip and possibly pinch point. MU
window milling BH^.
Printed: 1126/2001 4:31:05 PM
( RECEIVED
BP EXPLORATION FEB 2, 0 2001 Page 3 of 8
Operations Summary ReportNaska 0il & Gas Cons. Commission
Anchorage
Legal Well Name: P-09
Common Well Name: P-09L1 Spud Date: 7/13/1993
Event Name: REENTER+COMPLETE Start: 11/27/2000 End: 1/2/2001
Contractor Name: NORDIC CALISTA Rig Release: 12/3/2000 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
12/2/2000 16:15 - 18:30 2.25 STWHIP PROD1 RIH wi milling assy
18:30 - 19:30 1.00 STWHIP PROD1 Tag lightly 12808' CTM, looked liked movement, RIH to 12812', stall.
SD pumps. Repeat tag 12812'. Repeat. Tag 12814'. Small overpulls
each time. Started losing returns again while circulating. 1.0 BPM
losses initially, slowed to 0.2 BPM fairly quickly. RIH, push whipstock
thru LCM to 12823'. Push some more to 12835'. Push to 12856' CTD
(no further progress, a little sticky). Top of WS is now at 12842' ELMD
and approx 20' below top perf. Another first for CTD-a WS/LCM sqz
19:30 - 21:20 1.83 STWHIP PROD1 POOH, discuss. Plan is to move to P-02 where we can be more
productive while Baker solves the WS setting problem. Temp is -37
deg F
21:20 - 22:10 0.83 STWHIP PROD1 LD milling assy. MU nozzle assy
22:10 - 00:00 1.83 STWHIP PROD1 RIH
12/3/2000 00:00 - 00:15 0.25 STWHIP PROD1 Fin RIH to 12800'
00:15 - 00:50 0.58 STWHIP PROD1 Circ 2% KCI to nozzle 2.6~2.5 @ 2000 psi
00:50 - 02:30 1.67 STWHIP PROD1 POOH displacing wellbore to 2% KCI and recover mud
02:30 - 03:30 1.00 STWHIP PROD1 SW to MeOH ~ 6000'. FP top 2000' with 30 bbls MeOH
03:30 - 04:30 1.00 STWHIP PROD1 LD noz assy, blow down lines
04:30 - 06:00 1.50 STWHIP PROD1 NDBOPE. NU tree cap and test
12/23/2000 17:00 - 20:00 3.00 RIGU PRE Accept rig 17:00 hrs 12/23/00. Spot equipment, NU BOPE.
20:00 - 00:00 4.00 BOPSUF DECOMP Attempt BOPE test. Swab and master leak. Service tree. Start with
choke manifold. PT BOPE. Witness waived by John Crisp.
12/24/2000 00:00 - 01:30 1.50 BOPSUF DECOMP Finish BOPE test.
01:30-02:15 0.75 KILL DECOMP Checkwell. WHP=150psi. Bleed thru buster. Fillwell(12bbls).
02:15 - 03:00 0.75 STWHIP WEXlT MU milling BHA. Stab inj.
03:00 - 04:15 1.25 STWHIP WEXIT Creep in hole while inspecting and aligning chains on injector. ~
04:15 - 06:30 2.25 STWHIP WEXIT RIH. Tag dry 12750' CTM. Stack 5k. Looks good. PU. Bring-up
pumps. Ease into it.
06:30 - 10:00 3.50 STWHIP WEXlT Start milling window, correct depth to 12731 ff at milling point.
,Top of whipstock at 12,730 f. Flag CT. Milling 1 FPH, 2.5 BPM, 1600
~psi with 2% KCL water. Milled to 12735.4 ft. in 3.5 hrs.
10:00 - 11:30 1.50 STWHIP WEXlT Milling window. 1000 - 2000~ WOB, 2 FPH, 2.5 BPM, 1800 psi. Milled
to 12738 ft.
Window top at 12,731, window bottom at 12,737.3 ft.
11:30 - 12:50 1.33 STWHIP WEXlT Drill formation to 12,747 ff at 8 FPH, 2-3K WOB, 2.5 BPM, 1800 psi.
12:50 - 14:00 1.17 STWHIP WEXlT Backream and ream down. Ream up and down, RIH to TD without
pump, no wt loss. Window very clean.
14:00 - 15:00 1.00 STWHIP WEXIT Circ. FIoPro while reaming window.
15:00 - 17:15 2.25 STWHIP WEXIT POOH with milling BHA.
17:15 - 18:00 0.75 STWHIP WEXlT LD milling BHA. Diamond mill smooth on gage and 1/16" UG. String
mill in gage.
18:00 - 18:30 0.50 DRILL PROD1 Change packoff
18:30 - 19:00 0.50 DRILL PROD1 Safety meeting.
19:00 - 19:30 0.50 DRILL PROD1 Change CTC. Pull and PT.
19:30 - 20:30 1.00 DRILL PROD1 Injector maintenance
20:30 - 21:15 0.75 DRILL PROD1 MU drilling BHA #6:M-09 and 2.0 deg motor.
21:15 - 21:45 0.50 DRILL PROD1 RIH. Shallow test tools at 1200'. Orienter not clicking.
21:45 - 23:15 1.50 DRILL BHA PROD1 : POOH to change orienter. Found that plug in equalizer had not been
pulled. Change-out. RIH. Shallow test. Good.
23:15- 00:00 0.75 DRILL PROD1 RIH.
12/25/2000 00:00 - 01:30 1.50 DRILL PROD1 RIH. Correct depth at flag (-23').
01:30 - 02:10 0.67 DRILL PROD1 Log tie-in above whip. Correct depth to BHCS.(-2.5'). Losses at 0.5
BPM with full pump.
Printed: 1/26/2001 4:31:05 PM
(" (' RECE!VFf
BP EXPLORATION FEBI~, 0 zol~lge4°f8
Operations Summa Report
Alaska Oil & Gas Cons. Commission
A~ch0rc, gc
Legal Well Name: P-09
,Common Well Name: P-09L1 Spud Date: 7/13/1993
:Event Name: REENTER+COMPLETE Start: 11/27/2000 End: 1/2/2001
!Contractor Name: NORDIC CALISTA Rig Release: 12/3/2000 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
12125/2000 02:10 - 02:20 0.17 DRILL PROD1 Orient high side (17L).
02:20 - 07:00 4.67 DRILL PROD1 RIH clean thru window. Tag 12746'.
Drill 2.6/2.2, 3200 psi, 25L. Shublik drilling about 25 FPH. Drill to
12,875 ft. Losses slowed to 0.2 BPM.
07:00 - 08:20 1.33 DRILL PROD1 Drilling, TF = 289L. 60 FPH, 2.5 BPM, 3200 psi.
Drilled to 12,930 ft.
08:20 - 10:30 2.17 DRILL PROD1 POOH for 1.0 deg motor.
10:30 - 13:20 2.83 DRILL PROD1 At surface, CIO motor, bit and add Sperry resistivity.
Test resistivity tool.
13:20- 16:00 2.67 DRILL PROD1 RIH with BHA #7, 1.0 deg motor and Bit #2, DS49H4
16:00 - 16:30 0.50 DRILL PROD1 Logged tie-in across Sag River. [ -26 ft CTD.]
16:30 - 17:10 0.67 DRILL PROD1 Mad pass from window to 12930 ft with Sperry resistivity.
17:10 - 18:00 0.83 DRILL PROD1 Drilling top of Zone 4, 90L TF, 100 FPH, 2.4 BPM, 3500 psi.
0.1-.02 BPM mud loss. Drill to 13,000 ft.
18:00 - 18:30 0.50 DRILL PROD1 Drilling to 13014'
18:30 - 20:30 2.00 DRILL PROD1 Bad valve on MP #2, switch to MP #1. Drill to 13100'.
20:30 - 21:00 0.50 DRILL PROD1 Wiper to window.
21:00 - 22:45 1.75 DRILL PROD1 Drill 2.5/3400/65L to 13240'
22:45 - 23:00 0.25 DRILL PROD1 Orient around.
23:00 - 23:45 0.75 DRILL PROD1 Drill to 13300'.
23:45 - 00:00 0.25 DRILL PROD1 Wiper to window.
12/2612000 00:00 - 00:20 0.33 DRILL PROD1 Wiper to window.
00:20 - 02:00 1.67 DRILL PROD1 Drill 2.5/3400/95L to 13395'. Losses steady at 7 BPH.
02:00 - 02:15 0.25 DRILL PROD1 Orient for right turn.
02:15 - 03:05 0.83 DRILL PROD1 Drill to 13465'.
03:05 - 03:20 0.25 DRILL DS PROD1 Differentiall stuck pipe on bottom. Work. SD pumps, let sit. Work
again. Pulled free.
03:20 - 04:00 0.67 DRILL PROD1 Wiper trip to window.
04:00 - 06:40 2.67 DRILL PROD1 Drill 2.6/3800/90R. Losses hanging-in there at 7 BPH. Drill to 13635'.
06:40 - 07:15 0.58 DRILL PROD1 Wiper trip to window. Hole clean.
07:15 - 07:45 0.50 DRILL PROD1 Logged tie-in with BHCS/GR. [+24 ft CTD]
07:45 - 08:15 0.50 DRILL PROD1 Wiper trip to TD. Hole clean.
08:15 - 08:30 0.25 DRILL PROD1 Orient TF to 80R.
08:30 - 10:40 2.17 DRILL PROD1 Drilling, TF = 80R, 100 FPH, 2.5 / 2.4 BPM, 3500 psi.
Drill to 13,785 ft. Mud loss of 8 BPH.
10:40 - 11:45 1.08 DRILL PROD1 Short trip to window. 40K up wt. RIH. Hole clean.
11:45 - 14:00 2.25 DRILL PROD1 Drilling, TF = 100L, 2.4 / 2.3 BPM, 3600 psi, 60 FPH.
Drilled to 13,870 ft.
14:00 - 15:30 1.50 DRILL PROD1 Drilling, TF -- 54L, 2.4 / 2.3 BPM, 3600 psi, 70 FPH. '
Mud loss of 10 BPH. Drilled to 13,925 FT. Onload another 200 bbls
mud (told mostly new, but acutally mostly used).
15:30 - 16:45 1.25 DRILL PROD1 Short trip to window.
16:45 - 17:40 0.92 DRILL PROD1 Try drilling. Pump pressure too high recent mud addition 2.4~3800.
Can't drill like this. Order new mud. Drill at Iow pump. Pressure
.coming down a little. Drill 30L to 13955'
17:40 - 18:00 0.33 DRILL PROD1 'Orient around.
18:00 - 21:00 3.00 DRILL PROD1 Drill 2.5/3700/80L. Poor slide, overpulls. Drill to 14064'
21:00 - 22:00 1.00 DRILL PROD1 Wiper to window
22:00 - 22:50 0.83 DRILL PROD1 Begin tie-in at 12690' 2.513650/179L
22:50 - 23:10 0.33 DRILL PROD1 Add 24.0'. Replace 5 injector bearings
23:10 - 23:20 0.17 DRILL PROD1 RIH. Set down at 12730', orient to high side
23:20 - 00:00 0.67 DRILL PROD1 RIH to TD while swap to new FIo Pre mud
12/27/2000 00:00 - 00:15 0.25 DRILL PROD1 Tag at corr TD of 14080'. Orient
Printed: 1/26/2001 4:31:05 PM
RECEIVED ......
(."
BP EXPLORATION & Co.s. Co ¢ of 8
Anchorage
Operations Summa Report
Legal Well Name: P-09
Common Well Name: P-09L1 Spud Date: 7/13/1993
Event Name: REENTER+COMPLETE Start: 11/27/2000 End: 1/2/2001
Contractor Name: NORDIC CALISTA Rig Release: 12/3/2000 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
12/27/2000 00:15 - 02:00 1.75 DRILL PROD1 !Drill 4' and lost full returns 2.5/0.1, 2900 psi / 66L. Drill ahead to 14140'
and regained partial returns 2.5/1.1 3550 45L. Mix Formaset pill
02:00 - 02:25 0.42 DRILL CIRC PROD1 Wiper to 13700' while add accel to Formaset
02:25 - 02:55 0.50 DRILL (:;IRC PROD1 RIH and load CT w/pill 1.7/0.5 2800 psi. Get 23 bbls. Displace at
1.9/0.7 3800 psi
02:55 - 03:45 0.83 DRILL ClRC PROD1 1.5/3500 Close choke w/pill at bit at 14110' pulling 6'/min 39.5K.
Steady WHP rise to 630 psi at 1.0 bpm 3800 psi. Red rate after 5 bbls
out to 0.7 bpm to keep under 600 psi WHP and 3800 psi CTP. Bleed
WHP to zero when CTP @ 4200 psi and 12 bbls left in CT. Attempt to
clear CT w/o success. PUH 20-30K over to 13800' while attempting to
pump w/o success. Fill hole from BS while POOH. Est 6 bbls in loss
zone, 5 bbls in hole, 12 bbls in CT
03:45 - 05:30 1.75 DRILL ClRC PROD1 In liner at 12700' (whew). POOH, hoping HB&R can move this stuff
05:30 - 05:45 0.25 DRILL ClRC PROD1 Safety mtg re: Hi press pumping
05:45 - 06:10 0.42 DRILL CIRC PROD1 Park CT @ 3740'. PT HB&R @ 6000 psi. Open to CT and attempt to
move the Formaset w/o success @ 6000 psi
06:10-06:45 0.58 DRILL ClRC PROD1 Bleed back. Fin POOH
06:45 - 07:15 0.50 DRILL ClRC PROD1 LD drilling BHA. Install big nozzle. Stab on well. RIH.
07:15-07:30 0.25 DRILL ClRC PROD1 Safety meeting.
07:30 - 08:30 1.00 DRILL ClRC PROD1 Try pumping the Form-a-Set out with the rig pump. No go. Pressure
up with HB&R to 8000 psi. No go. Bleed and ramp. No luck.
08:30- 11:00 2.50 DRILL ClRC PROD1 RIH to window.
11:00 - 13:00 2.00 DRILL LINE PROD1 Unfreeze HB&R.
13:00 - 13:45 0.75 DRILL ClRC PROD1 Pressure coil in cycles to 8000 psi. No luck moving the Form-A-Set.
It's formed and set.
13:45- 16:15 2.50 DRILL ClRC PROD1 POOH slowdue to reel motor mount damage.
18:15- 17:45 1.50 DRILL ClRC PROD1 Cut off CTC. Cut mule shoe guide. RIH to 3000'. Cycle pressure to
8100 psi. No go. POOH.
17:45 - 18:30 0.75 DRILL ClRC PROD1 Try one more time from surface open-ended, no success
18:30 - 21:10 2.67 DRILL REEL PROD1 Reel motor mount repair
21:10- 21:40 0.50 DRILL ClRC PROD1 :RU hydraulic cutter assy. Cut off 10' of CT
21:40- 00:00 2.33 DRILL ClRC PROD1 Formulate a game plan. R & H anal. PJSM. Fin RU
12/28/2000 00:00 - 00:30 0.50 DRILL ClRC PROD1 Fin RU to cut CT in lengths to remove Formaset and dispose of CT
00:30 - 05:00 4.50 DRILL ClRC PROD1 Cut 80' of frozen CT in 10' lengths. Cut CT in 2-4' lengths w/hydraulic
cutter and supersuck Formaset from each
05:00 - 06:10 1.17 DRILL ClRC PROD1 After cutting 1690' were able to move Formaset with 4000 psi-albeit
slowly
06:10 - 07:00 0.83 DRILL ClRC PROD1 RD cutter. Stab onto lub. Displace remainder to green tank-est 3 bbls
07:00 - 10:00 3.00 DRILL ClRC PROD1 Cut remaining coil (the initial frozen stuff).
10:00- 12:00 2.00 DRILL ClRC PROD1 RU N2 unit. BIowdown reel.
12:00 - 14:00 2.00 DRILL ClRC PROD1 Unstab coil, pull to reel, secure. Knock-out hardline. Struggle getting
reel carrier pin free.
14:00 - 16:00 2.00 DRILL ClRC PROD1 Swap reels.
18:00 - 21:30 5.50 DRILL REEL PROD1 Install support braces on reel motor assembly.
21:30 - 00:00 2.50 DRILL ClRC PROD1 Pull CT off reel and stab in injector
12/29/2000 00:00 - 02:00 2.00 DRILL ClRC PROD1 Install CTC. PT 35k. Install hardline in reel
02:00 - 03:30 1.50 DRILL ClRC PROD1 Fill CT w/mud. Pump wiper dart and hit at 58.3 bbls. PT @ 4000 psi
03:30 - 04:20 0.83 DRILL ClRC PROD1 MU drilling BHA #8 (0.69 deg motor)
04:20 - 05:50 1.50 DRILL OTHR PROD1 Depth encoder reading reverse direction-fix it
05:50 - 08:30 2.67 DRILL ClRC PROD1 RIH, SHT 2.6/2.4 3250 160R, test orientor, ok
08:30 - 09:00 0.50 DRILL ClRC PROD1 Log tie-in above window 2.7/2.0 at 3250.psi. Correct depth (-30').
09:00 - 09:15 0.25 DRILL ClRC PROD1 Change-out electronic counter.
09:15 - 09:40 0.42 DRILL ClRC PROD1 RIH. Sat down 13000', fell thru. Sat down 13300'. Can't work thru.
Printed: 1/26/2001 4:31:05 PM
L,, F_. i ¥
BP EXPLORATION Page 6 of 8
FEB
Operations Summary Report
^~o=~,~ c)it & Gas Cons. Commission
Legal Well Name: P-09 ........ Anchorage
Common Well Name: P-09L1 Spud Date: 7/13/1993
Event Name: REENTER+COMPLETE Start: 11/27/2000 End: 1/2/2001
Contractor Name: NORDIC CALISTA Rig Release: 12/3/2000 Group: COIL
Rig Name: 'NORDIC 1 Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
12/29/2000 09:15 - 09:40 0.42 DRILL CIRC PROD1 Orient to drilled TF.
09:40 - 10:20 0.67 DRILL CIRC PROD1 Ream and backream 13300' shale.
10:20 - 11:10 0.83 DRILL CIRC PROD1 RIH. Work shale 13800'. RIH. Mad pass bottom 30' at 2.611.8 and
3400 psi. Tag TD 14134'.
11:10 - 12:00 0.83 DRILL PROD1 Drill 2.6/1.8 at 10L to 14160'. Sheets of Form-a-Set coming across
shaker (1/8" to 1/4" thick).
12:00 - 12:15 0.25 DRILL PROD1 Orient around.
12:15 - 12:45 0.50 DRILL PROD1 Drill 2.6~2.0 to 14165'. Can't slide past here. Run at it. Can't get motor
work. Bit balled?
12:45 - 15:00 2.25 DRILL PROD1 Hole cleaning trip to window.
15:00 - 16:45 1.75 DRILL PROD1 Drill 2.6~2.0 at 3600 psi and 90L to 14250'-- lots of stacking, tough
drilling.
16:45 - 17:00 0.25 DRILL SWAT PROD1 Orient around to begin revised planned drop
17:00 - 17:45 0.75 DRILL PROD1 Drill 2.5/1.6 at 120L. Losses a little higher. Drill to 14320'.
17:45 - 18:45 1.00 DRILL PROD1 Wiper trip to window.
18:45 - 19:10 0.42 DRILL PROD1 Log tie-in, add 10'
19:10 - 19:30 0.33 DRILL PROD1 RIH. Set down at 13308' at 37L
19:30 - 20:00 0.50 DRILL PROD1 Orient around to drilled TF. Work 15 min to get past 13380'
20:00 - 20:30 0.50 DRILL PROD1 RIH. Tag TD ~ 14329'
20:30 - 21:00 0.50 DRILL PROD1 Drilling 2.5/1.5 3280 149L
21:00 - 21:15 0.25 DRILL PROD1 Drill to 14355' and stacking. Wiper to 14200'
21:15 - 22:15 1.00 DRILL CLN PROD1 Get back to TD, but Iow on mud. Circ at min while WO mud
22:15 - 22:45 0.50 DRILL PROD1 Resume drilling, can't even get back to bottom. Motor keeps stalling at
14350'
22:45 - 23:05 0.33 DRILL PROD1 New mud out bit and begin to make progress 2.6/1.7 3480 155L 99 deg
at bit. Add accel to Formaset pill
23:05 - 23:20 0.25 DRILL CIRC PROD1 Drilled to 14367'. PUH while load CT w/14 bbls Formaset 2.011.2 2720
23:20 - 23:40 0.33 DRILL ClRC PROD1 Displace w/mud at 1.8/1.1 2600 (having charge pump probs)
23:40 - 23:50 0.17 DRILL Circ PROD1 2.113600 Red rate to 1.5/3200 with pill at bit. Close choke with bit at
14100' pulling 4'/rain 41.5k. Immediate press increase and steady rise
to 700 psi after 4 bbls out. Continue same ratelPUH speed while
displacing
23:50 - 00:00 0.17 DRILL Circ PROD1 Red rate from 1.5/3500 psi to 1.0 bpm w/1 bbl left at 14060' and bleed
off max WHP of 1120 psi. POOH 45'/min with full returns
12/30/2000 00:00 - 00:20 0.33 DRILL CIRC PROD1 POOH in open hole with a few overpulls
00:20 - 02:30 2.17 DRILL CIRC PROD1 POOH for resistivity tool
02:30 - 05:50 3.33 DRILL CIRC PROD1 Bit, motor ok. LD shock sub. Add resistivity tool-upload
05:50 - 08:40 2.83 DRILL CIRC PROD1 RIH w/BHA #9. Try SHT. High WHP, clean-out MM. Shallow hole test
at 6500' (MM out bypassed) 2.5 at 4000 psi (vs 3250 psi without
resistivity). Getting 1:1 at min rate until about 9000', then started
seeing about 0.2 BPM losses.
08:40 - 09:15 ,0.58 DRILL ClRC PROD1 At window. Look at GR and inc for clue on depth (E-counter
malfunction). Log tie-in 2.3/1.9 3500 psi. No trucks available for mud.
Correct depth (+25.5').
09:15- 10:00 0.75 DRILL CIRC PROD1 RIH. Work thru tight shale 13,360'.
10:00 - 12:00 2.00 DRILL CIRC PROD1 , Log real-time Mad pass from 14080' to TD at 2.5 FPM. Work thru
shales 14100' an 14150'. Logging at 2.6~2.2 and 3600 psi. Reduce
rate 2.3/1.9 at 3200 psi. Tag TD 14367'.
12:00 - 12:30 0.50 DRILL CIRC PROD1 Pull to window and wait for mud. Found broken truck that can get some
mud to us.
12:30 - 15:15 2.75 DRILL CIRC PROD1 Wait on new mud. Mix weak 35 bbl pill with 250~ OM & LC LCM (last
on location).
15:15- 17:00 1.75 DRILL CIRC PROD1 RIH. Lay in pill from 14100'. Circulate from above and watch losses.
Printed: 1/26/2001 4:31:05 PM
(' RECEIVED
FF_B 0
BP EXPLOFb~,TIO~ Page 7 of
Operations Summary ReportAlaska Oil & Gas Cons. commission
Anchorage
Legal Well Name: P-09
Common Well Name: P-09L1 Spud Date: 7/13/1993
Event Name: REENTER+COMPLETE Start: 11/27/2000 End: 1/2/2001
:Contractor Name: NORDIC CALISTA Rig Release: 12/3/2000 Group: COIL
!Rig Name: NORDIC I Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
12/3012000 15:15- 17:00 1.75 DRILL CIRC PROD1 Didn't see nuttin.
17:00 - 18:00 1.00 DRILL CIRC PROD1 RIH. Work sticky shale 13360' and 14170'. Tag TD 14360°. Correct to
14367'.
18:00 - 18:45 0.75 DRILL PROD1 Drill 2.4/1.9 and 3400 psi at 100L to 14386'
18:45 - 19:00 0.25 DRILL PROD1 Orient to right side
19:00 - 19:45 0.75 DRILL PROD1 Drilling 2.5/2.0 3400 at 90R. Bypass 'out' MM due to high backpressure
(WHP). Drill to 14451'
'19:45 - 20:30 0.75 DRILL CIRC PROD1 PUH at reduced rate after bypass plugged and had high WHP-LCM
works on surface! Clean out fluid return lines
20:30 - 21:40 1.17 DRILL PROD1 Resume drilling 2.512.1 3400 123R and drill to 14530'. Found
somewhat encouraging oil sand 14290-14420'
21:40 - 22:40 1.00 DRILL PROD1 Wiper to window
22:40 - 23:15 0.58 DRILL PROD1 Begin tie-in, add 4.0'
23:15- 00:00 0.75 DRILL PROD1 RIH to TD .
12/31/2000 00:00 - 00:45 0.75 DRILL PROD1 Tag corr TD at 12535' 147L. Orient around
00:45 - 05:20 4.58 DRILL PROD1 Drilling 2.5/2.1 3500 70L 90-95 deg. Drilling w/neg wt-hard to make
hole. Drill to 14662'
05:20 - 06:25 1.08 DRILL PROD1 Wiper to window
06:25 - 07:05 0.67 DRILL PROD1 Tie-in. Correct depth (+4').
07:05 - 08:00 0.92 DRILL PROD1 RIH to TD.
08:00 - 09:20 1.33 DRILL PROD1 Drill with neg wt 2.4~2.0 and 3500 psi at 175R to 14690'. Acts like sand,
but can't slide. Need to yank resistivity.
09:20 - 12:00 2.67 DRILL PROD1 POOH to LD resistivity and perform weekly BOP test.
12:00 - 14:00 2.00 DRILL PROD1 LD BHA. Download resistivity.
14:00 - 18:00 4.00 DRILL PROD1 Perform weekly BOP test, witnessed by Jeff Jones. Can't get tree
valves to hold. Call for TWC. Test choke valves. Test Iow and high
H2S and LEL alarms.
18:00- 19:00 1.00 DRILL TREE PROD1 SetTWC
19:00 - 23:30 4.50 DRILL PROD1 Test BOPE. Pull TWC
23:30 - 00:00 0.50 DRILL PROD1 MU drilling BH^
1/1/2001 00:00 - 00:30 0.50 DRILL PROD1 Fin MU drilling BHA
00:30 - 02:50 2.33 DRILL PROD1 RIH w/BH^ #10
02:50 - 03:50 1.00 DRILL PROD1 Begin tie-in, add 26.0' 2.3/2.0 3000 51R
03:50 - 04:45 0.92 DRILL PROD1 RIH to TD. Set down at 13380', orient to drilled TF. RIH
04:45 - 06:15 1.50 DRILL PROD1 RIH to 14641' and set down. PUH 30k over to 14600'. Work nasty
shale at 14610-20' 2.7/2.3 3560 151R
06:15 - 08:00 1.75 DRILL PROD1 Get to 14652'. Pump #2 packing blew, switch to #1. Resume working
to get to btm. Work to 14680'.
08:00 - 08:15 0.25 DRILL PROD1 Log tie-in at 14450' GR. Within 3'-4' of being on depth.
08:15 - 09:00 0.75 DRILL PROD1 Pull to window for power pack repair.
09:00 - 09:45 0.75 DRILL POWR PROD1 Power pack repair.
09:45 - 10:00 0.25 DRILL PROD1 Log tie-in. Correct depth (+10').
10:00 - 11:00 1.00 DRILL PROD1 RIH. Ream and backream ugly shale 13380'. Work to TD. Tag
14685'. Back ream slowly across shale on bottom. Lots of motor work
and packing-off. Bit bailing.
11:00 - 14:30 3.50 DRILL PROD1 Drill and backream 2.7~2.5 and 3600 pointing straight down to 12715'.
Drilling 5 fi/hour. Looks like we need to drill another 80' to get out of
this. Anchorage content with what we have.
14:30 - 14:45 0.25 DRILL PROD1 Log mad pass for 20' GR gap.
14:45 - 15:45 1.00 DRILL PROD1 Wiper to window
15:45 - 16:00 0.25 DRILL PROD1 Tie-in at window. Correct depth (+9').
16:00 - 16:45 0.75 DRILL PROD1 RIH and ream shales to TD. Tough one at 13380'. Tag TD 14715'
corrected.
Printed: 1126/2001 4:31:05 PM
' ("' (" RFCFIVFD
BP EXPLORATION FEB 2 0 ~O01~age 8 of 8
Operations Summary Report Alaska 0il & Gas Cons. Commission
A n~-hnr~n~
Legal Well Name: P-09
Common Well Name: P-09L1 Spud Date: 7/13/1993
Event Name: REENTER+COMPLETE Start: 11/27/2000 End: 1/2/2001
Contractor Name: NORDIC CALISTA Rig Release: 12/3/2000 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Sub
Date From-To Hours Task Code Phase Description of Operations
111/2001 16:45- 19:00 2.25 DRILL PROD1 POOH,
19:00 - 20:00 1.00 DRILL PROD1 I LD drilling BHA
20:00 - 20:45 0.75 CASE COMP ~RU to run liner
20:45 - 21:00 0.25 CASE COMP Safety mtg re: liner
21:00 - 00:00 3.00 CASE COMP MU 76 jts of 2-7/8" 6.16# L-80 STL slotted and solid liner w/assys
1/2/2001 00:00 - 01:00 1.00 CASE COMP Set liner in 2-718" slips. RU to run CSH workstring
~01:00 - 02:30 1.50 CASE COMP MU 37 stds CSH workstring and space out
102:30 - 03:00 0.50 CASE COMP Install Baker CTLRT
03:00 - 05:00 2.00 CASE COMP RIH w/liner assy. Wt chk @ 12700' 47K, 19K. RIH to 14675' CTD and
sets down hard. With normal +25' corr should be close to TD. Up wt
clean at 51 K, 8K down clean
05:00 - 05:50 0.83 CASE COMP Launch 5~8" ball. Displace w/mud 2.2/1.9 3430 psi. Ball seated at 55
bbls and sheared out at 4300 psi. PUH 40k, released.
05:50 - 08:30 2.67 CASE COMP Displace well to 2% KCl water 2.4/2.1 3500. Final 2.1/2.0 3500.
Gained 10k back twice. Pushed liner to 14691' CTD.
08:30 - 10:00 1.50 CASE COMP Unsting and displace mud out of liner. Sting back in and pump 6 ppb
lithium hypochlorite in open hole annulus, then unsting and lay the
remainder in the liner. Losses greater with bleach (2.0/1.0).
10:00 - 12:00 2.00! CASE COMP POOH filling.
12:00 - 16:00 4.001 CASE COMP LD CSH in singles. LD CSH in derrick
16:00 - 17:30 1.50 CASE COMP RU nozzle assy. RIH to 1500' and FP well with 18 bbls MeOH (well
taking 10 bph). POOH. SI swab valve.
17:30 - 19:00 1.50 CASE COMP Displace CT w/N2 and bleed down
19:00 - 20:30 1.50 CASE COMP Clean pits. Pull CT back on to reel. ND BOPE.
RELEASE RIG FROM WELL P-09L1 AT 20:30 HRS ON 01/02/2001.
Printed: 1126/2001 4:31:05 PM
18-Jan-01
AOGCC
3001 Porcupine Drive
Anchorage, AK 99501
Definative Surveys
Re: Distribution of Survey Data for Well P-09L1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 12,632.90' MD
Window / Kickoff Survey: 12,730.00' MD
Projected Survey: 14,715.00' MD
(if applicable
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ
ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ
mmmmm mmmmm mmmmm mmmmm mmmmm
~ 0
~0
ZZZZZ
ooo~
ZZZZZ
~mm
00000
ZZZZZ
ZZZZZ
mmmmm
0000~
.....
ZZZZZ
ZZZZZ
ZZZZZ
ZZZZZ
.....
00000
ZZZZZ
ZZZZZ
mmmmm
Z
00000 ~
0000~
t~ '~ 0
ALASKA OIL AND GAS
CONSERVATION CO~ISSION
Ted Stagg ·
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
TONY KNOWLES, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE. ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Rez
Prudhoe Bay Unit P-09L1
BP Exploration (Alaska.) Inc.
Permit No: 200-189
Sur'Loc: 2417'NSL, 1906'EWL, Sec. 31, TllN, R13E, UM
Btmhole Loc.. 2258'NSL, 1879'WEL, Sec. 26, T11N, RI2E, 'UM
Dear Mr. Stagg:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
The permit is for a new wellbore segment of existing well P-09, Permit No. 193-058, API 50-
50-029-22362. Production should continue to be reported as a function of the original API
number stated above.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the Noah Slope pager at 659-3607.
Sincerely,
J. M. Heusser
Commissioner
BY ORDER OF THE COMMISSION
DATED this 7..D .t'l,x~ day of November, 2000
dif/Enciosures
cc:
Department of Fish & Game, Habilal Section w/o enci.
Deparlment of Enviromnental Conservation w/o encl.
,,. STATE OF ALASKA I~
ALASK,{ .L AND GAS CONSERVATION COMI( ~lOU ~~/~ (~
PERMIT TO DRILL
20 AAC 25.005
la. Type of work
[313 Drill la Reddll Iilb' TypeOfwell I-I Service i-I OevelopmentGas t"a Sing~ebZone I-I Multiple Zone
Re-Entry [] Deepen [] Exploratory [] Stratigraphic Test [] Development Oil
.2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan KBE = 86.7' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 O~,,~,_hDL 028264
4. Location of well at surface ,/ ,/' J' 7. Unit or PrT3perty Name 11. Type Bond (See 20 AAC 25.025)
2417' NSL, 1906' EWL, SEC. 31, T11N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
1919' NSL, 5181' WEL, SEC. 25, T11N, R12E, UM P-09L1 Number 2S100302630-277
At total depth 9. Approximate spud date
2258' NSL, 1879' WEL, SEC. 26, T11 N, R12E, UM 11/23/00 Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 047451, 3021' MDI No Close Approach 2560 14994' MD / 8919' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 12770' MD Maximum Hole Angle 98 ° Maximum surface 2312 psig, At total depth (TVD) 8800'/3368 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casino Wei.qht Grade Couplin,q Len,qth MD TVD MD TVD (include sta,qe data)
3-3/4" 2-7/8" 6/16# L-80 ST-L 2594' 12400' 8513' 14994' 8919' Llncemented Slotted Liner
't~.: i'.',' :, .;~ ,.... : !", ,.'..
{~ ~.'-': ;:~r,'~,.. ,'.'~,..,"
19. To be completed for Reddll, Re-entry, and Deepen Operations.
Present well condition summary MOM '~ 6 ~000
Total depth: measured 13100 feet '/ Plugs (measured)
true vertical 9141 feet '/
.,t.!~.i,!ii!i~jii.;,;,.:~'."F~ :!.' ~ .,, .~ ..... .~,. .... . ................. .,,,.~...: ......
Effective depth: measured 13021 feet Junk (measured)
.6:...,. ~:.~'~.-.'",,F,, .",
true vertical 9083 feet ,.... ~, ............ .,;:,~,
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" 267 sx Arcticset 110' 110'
Surface 3197' 10-3/4" 1050 sx CS III, 355 sx Class 'G' 3228' 2858'
Intermediate 12588' 7-5/8" 785 sx Class 'G' 12619' 8771'
Production
Liner 654' 5-1/2" 123 sx Class 'G' 12446' - 13100' 8634' - 9141'
Perforation depth: measured 12823'- 12880', 12892'- 12915', 12926'- 12986'
true vertical 8935' - 8979', 8988' - 9005', 9013' - 9057'
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 2,5.050 Requirements
Contact Engineer Name/Number: Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that~... .. .. .th® foregc)i~ng.~ true and correct to the best of my knowledge / /
Signed Ted Stagg- -~~~"~/"'~" Title CT Drilling Engineer Date //'~'~;2,.- --
II~ I ~I1'~ ~ ~1 ~ II II~ I;;~I ~1'I I ~; ~1 ~ ~ ~ )~'~;~'~ I'~ .... ~ I ~ ~1 ' ' II I ~ ~ ~ ~'1: ~ I I ~ r'~ ~ ~I~ ~ ~ .... ~' I ~i I ~ ';' ~'~'' '~ .... '~' '"'~ iii "' '~ ~ ~i ''~ ~'1' ~' ~ 'U''~ ~t~ ~ ) ~ ~ ~
.... ~!.1'~' 'I' '[ :~'.~" '"'C :~' t~h~"'r".', ~[t ..... ~ ~'q ,~ .... B~ ' ., .'-r~ ',[' · ~ ~ , ,~ ... ~.~j ,~I ,~t ~.,., ,~ .~ t~I t~i,~ .... ~., "~il' li".~', i:.i''' ;i~! .~I,~ .' ~i~.jli"'. i
Permit Number APl Number v/' I Approval Date I See cover letter
~'-' (~:5~ 50- 029-22362-60! //'"r'~/~/~'~I for other requirements
Conditions of Approval: Samples Required [] Yes [] No Mud Log RequiTed [] Yes [] No
Hydrogen Sulfide Measures [] Yes [] No Directional Survey Required [] Yes [] No
Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K ~[~3.5K psi for CTU
Other:
by oder of
Approved B)/ Commissioner the commission Date //'"
Form 10-401 Rev. 12-01-85
ORIGINAL
Submit In Triplicate
bp '~iOV
P-09L1 Sidetrack
'~:~
Summary of Operations:
P-09 is a Zone 4 producer that suffers from Iow rate, high water cut. The sidetrack, P-09L1, will exit the 5
1/2" liner in the Shublik interval and target Zone 4 bypassed oil to the west of the P-09 completion. A flow-
through whipstock will be used in order to retain production from the existing P-09 completion. This
sidetrack will be conducted in two phases.
Phase 1: Drift, set whipstock on E-Line. Planned for Nov. 23, 2000. · Wellhead seals will be tested.
· All GLM's will be dummied off, the IA will be loaded and pressure tested.
· A dummy whipstock drift will be run on slickline.
· CTE-Line will set the whipstock at approx. 12,760' MD (8806ss).
Phase 2: Mill window, Drill and Complete sidetrack: Planned for Nov. 25, 2000.
Drilling coil will be used to mill the window then drill and complete the directional hole as per attached
plan. The sidetrack will be completed with a slotted/solid liner. Top of 2 7/8" liner to be approx.
12,400' MD (8513ss).
Mud Program: · Phase 1: Seawater
· Phase 2: Seawater and FIo-Pro (8.6 - 8.7 ppg)
Disposal: · No annular injection on this well.
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program:
· 2 7/8" slotted/solid liner will be run from TD to approx. 12,400' MD (8513ss). Slotted liner will be used
within Zone 4 and solid liner will be used from the top of Zone 4 to the top of the liner at 12,400'.
Well Control: · BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2000 psi.
Directional
· See attached directional plan. BHL (State Plane): 622,039; 5,952,111. Max. hole angle is 98 deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging · An MWD Gamma Ray log will be run over all of the open hole section.
· A real time Resistivity Log will be run in open hole.
Hazards
H2S on P-09 was measured at 10 ppm on 8/3/2000. The highest H2S recorded to date on P Pad
is 48 ppm.
Lost circulation risk is Iow. The existing perfs will be sealed with high vis FIo-Pro while drilling the
P-09L1 sidetrack.
Reservoir Pressure
Res. press, is estimated to be 3368 psi at 8800ss. Max. surface pressure with gas (0.12 psi/fi) to surface
is 2312 psi.
TREE: 4-1/16"-5M CIW
WELLHEAD: 11" - 5M FMC
ACTUATOR: OTIS
10-3/4", 45.5#/ft, I 3228 I
NT-80LHE Butt
KOP @ 600'
Max Angle 54° @ 5938
4-1/2", 12.6#/ft, NSCT, 13
Cr TUBING
TUBING ID: 3.958"
CAPACITY: 0.0152 BBL/FT
NOTE: CHROME TUBING
Top of 2 7/8" liner to be at
approx. 12,400'
Top of 5-1/2 liner ! 12446
Baker 7-5/8" liner top packer
7-5/8", 29.7# I
12618
NT95HS NSCC~"'
~" 9L1 Proposed Completion ("'
KB. ELEV = 88.3'
BF. ELEV = 57.00'
RT - TS = 29.80'
SSSV LANDING I 2098'
NIPPLE
I
(OTIS 4.5")( 3.813" ID)
OTIS GAS LIFT MANDRELS
Wt:,X W/1" BK .ATCHE,~
NO. MD (BKB) TVDs DEV.
6 3468' ~:912 50.2
5 6879' 4998 51.7
4 9106' 6396 50.9
3 10983' 7563 51.7
2 12193' 8349 43.1
1 12299' 8427 42,3
~i '..'r,.!'!:.-'~," ,'~.:'.'.
4-1/2 .... SWS" NIPPLE
(PARKER) (3.813" ID) I 12356' I
(SABL-3) (3.875" ID) 12373'
4-1/2 .... SWS" NIPPLE
(PARKER) (3.813" ID)
4-1/2 .... SWN" NIPPLE
(PARKER) (3.725" ID)
2422'
4-1/2" WLEG I 12452'
ELMD [ 12443'
PERFORATION SUMMARY
REF: LOG: SWS BHCS DATED 7-28-93
INTERVAL OF EN/SQZ'D
12,823' - 12,880' Open 8-9-93
12,892' - 12,915' 8-9-93
12,926'- 12,986' )pen 8-9-93
12823'-12863' 0/28/93
NOTE: CHROME LINER
PBTD 113021
5-1/2", 17 #/ft, 13 Cr NSCC I' 13100
Flow-through whipstock to be
set at approx. 12,760'. Existing
perfs to be temporarily sealed
with high vis FIo-Pro. Slotted
liner completion to permit flow
from both P-09 and P-09L1.
::3 C:
,~~o~o
!
E
~ z
O,
OOl oJS tuo~j eouols!p A
Z
2 318" CT
I I
I 10,000 psi
Pack-Off
Lubricator~
P-09L1
CT Drilling & Completion BOP
ul
Z
12"
36"
22.5"
18"
7 1/16"
Annular
7 1116" 5000 psi
Blind/Shear ] : 7 1/16"
Pipe/Slip ~ 2 3/8"
7 1/16' X 5,000 psi ~
:--~ , ,, ,
Slips ~IB ~ 2 7/8"
7 1/16"
Pipe ~ ~ 2 3/8"
SWAB OR MASTER VALVE
WELL PERMIT CHECKLIST COMPANY
FIELD & POOL ~ INIT CLASS
WELL NAME p-O~'Z..[ PROGRAM: exp dev GEOL AREA
redrll
serv wellbore sag
UNIT# .~(~.~k.,,,~~
t/' ann. disposal para req
ON/OFF SHORE
ADMINISTRATION 1.
.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Permit fee attached .......................
Lease number appropriate~,~ ..................
Unique well name and number ..................
Well located in a defined pool ..................
Well located proper distance from drilling unit boundary ....
Well located proper distance from other wells ..........
Sufficient acreage available in drilling unit ............
If deviated, is wellbore plat included ...............
Operator only affected party ...................
Operator has appropriate bond in force .............
Permit can be issued without conservation order ........
Permit can. be issued without administrative approval ......
Can permit be approved before 15-day wait ...........
ENGINEERING
14. ConductiSr string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
N
N.
N
DATE
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
GEOLOGY
A,~ DATE
,~NNULAR DISPOSAL35. With proper cementing records, this plan
APPR DATE
(A) will contain waste in a suitable receiving zonei .......
. (B) will not contaminate, freshwater; or cause drilling waste...
to surface;'
(C) will not impair mechanical integrity of the well used for disposal;
(D) will not damage producing formation or impair recovery from a
pool; and
(E) will not cimumvent 20 AAC 25.252 or 20 AAC 25.412.
'GEOLOGY:
If diverter required, does it meet regulations ..........
Drilling fluid program schematic & equip list adequate .....
BOPEs, do they meet regulation .......... ._ ..... (~ N
BOPE press rating appropriate; test to ~(~O psig. {~ N ' ·
Choke manifold complies w/APl RP-53 (May 8~4') .......
. ' .
Work will occur without operat,on shutdown ........... ~ .~N .._ ~_ . . ~('~%~ %.~:~-..~ ,~,?'~. 5 '.L_ .
Isroresence of H2S ..aas probable ................. Y ~ ~7~-~,~\\~,,. % w,.,,~ c~.~%c~%~,,~ ~,X,,=o~O ~,t'e. cS~O[ ~a'~ ~ ~'~.t-~'~o ,
Permit can be issued wlo hydrogen sulfide measures y (~-"~
.....
Data presented on potential overpressure zones .... ....
Seismic analysis of shallow gas zones ............. ,{t~ *''Y N . . .
Seabed condition survey (if off-shore) ......... '.../,.-,1" Y N ' .
Contact name/phone for weekly progress reports [expl.,gm~ory only] Y N '
Y N
Y N
·
Y N
ENGINEERING: UIC/Annular COMMISSION: Commen~/In~tru¢fion~:
WM~
Z
.-I
-I-
..
c:\msoffice\wordian~diana\checklist (rev. 111011100)
Well History File
APPENDIX
Information. of detailed nature that is not .,
particularly germane to the Well Permitting Process
but is part of the history' file.
To improve {he readability of the Well History file and to
simplify finding information, informati;3n of this '.
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this. category of information.
Sperry-Sun DrillinG Services
LiS Scan Uti!i~y
SRevision: 3 $
LisLib SRevision: 4 $
Thu Apr ii 07:10:46 2002
Reel Header
Service name ............. LISTPE
Date ..................... 02/04/11
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library,
Tape Header
Service name ............. LISTPE
Date ..................... 02/04/11
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW-00322
S. LATZ
WHITLOW/MCMU
P-09L1
500292236260
BP Exploration (Alaska), Inc.
Sperry Sun
11-APR-02
MWD RUN 2 MWD RUN 3
AK-MW-00322 AK-MW-00322
S. LATZ S. LATZ
WHITLOW/MCMU MCMULLEN/SEV
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
MWD RUN 4 MWD RUN 5
AK-MW-00322 AK-MW-00322
S. LATZ S. LATZ
MCMULLEN/SEV MCMULLEN/SEV
31
11N
13E
2417
1906
88.30
.00
.00
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
lST STRING 10.750 3228.0
2ND STRING 7.625 12618.0
3RD STRING 5.500 12730.0
PRODUCTION STRING
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS !, 3, & 5 ARE iiRECTiONAL WITH NATURAL
GA.~J~ PROBE ( NC-P )
UTiLiZiNG A SCINTiLLATiOK DETECTOR.
3. M'WD RUNS 2 & 4 ARE DIRECTIONAL WiTH DUAL G~ RAY
(DGR% UTILIZING GEIGER
MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4).
4. GAI~ RAY (SGRD) LOGGED BEHIND CASING FROM 12716'
MD, 8763' SSTVD TO
12730' MD, 8774' SSTVD.
5.
RESISTIVITY DATA LOGGED ON A MADPASS WHILE RUNNING
IN THE HOLE
BEFORE DRILLING MWD RUN 200 FROM 12720' MD, 8766'
SSTVD TO
12896' MD, 8869' SSTVD TO OBTAIN DATA OVER TH~'
INTERVAL
DRILLED ON MWD RUN 100.
6.
RESISTIVITY DATA LOGGED ON A MADPASS WHILE RUNNING
IN THE HOLE
BEFORE DRILLING MWD RUN 400 FROM 14104' MD, 8930'
SSTVD TO
14331' MD, 8891' SSTVD TO OBTAIN DATA OVER THE
INTERVAL
DRILLED ON MWD RUN 300.
7.
GAMMA RAY (SGRD) OBTAINED DURING MWD RUN 500 FROM
14645' MD, 8868' SSTVD TO 14685' MD, 8866' SSTVD
IS REALTIME DATA DUE
TO LOST RECORDED DATA.
DEPTH SHIFTING / CORRECTION WAIVED BY A. FRANKENBURG
OF
BP EXPLORATION (ALASKA), INC. PER THE EMAIL FROM D.
SCNORR
OF 08/08/01. MWD CONSIDERED PDC.
THIS WELL KICKS OFF FROM P-09 AT 12730' MD, 8774'
SSTVD (TOP OF WHIPSTOCK)
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCES.
9,
MWD RUNS i - 5 REPRESENT WELL P-09L1 WITH API
50-029-22362-60.
THIS WELL REACHED A TOTAL DEPTH OF 14715' MD, 8865'
SSTVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING )
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING )
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING )
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING )
SFXE = SMOOTHED FORMATION EXPOSURE TIME
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGE2 ~WD
Depth shifted and clipped curves; all bit runs merged.
DEPTH iNCREMENT: .500C
FiLE SUMF~RY
PBU TOOL CCDE START DEPTH STOP DEPTH
GR 12716.5 14685.0
RPD 12720.0 14656.C
RPM 12720.0 14656.0
RPS 12720.0 14656.0
RPX 12720.0 14656.0
ROP 12748.5 14715.0
FET 12748.5 14656.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 12716.5 12930.0
2 12930.5 14138.5
3 14139.0 14367.0
4 14367.5 14690.0
5 14690.5 14715.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data specification Block Type ...... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lIN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order
Units Size Nsam Rep
Code. Offset Channel
DEPT FT 4 i 68 0 1
ROP MWD FT/H 4 I 68 4 2
GR MWD API 4 i 68 8 3
RPX MWD OHMM 4 I 68 12 4
RPS MWD OHMM 4 i 68 16 5
RPM MWD OHMM 4 i 68 20 6
RPD MWD OHMM 4 i 68 24 7
FET MWD HR 4 1 68 28 8
Name Service Unit Min Max Mean Nsam
DEPT FT 12716.5 14715 13715.8 3998
ROP MWD FT/H 0.76 3116.33 99.6933 3934
GR MWD API 18.02 1103.06 55.7216 3938
RPX MWD OHMM 0.35 2000 10.523 3873
RPS MWD OHMM 0.1 2000 13.2036 3873
RPM MWD OHMM 0.11 1853.04 10.4382 3873
RPD MWD OHMM 0.15 1874.93 11.7245 3873
FET MWD HR 0.23 81.49 5.71805 3816
First Reading For Entire File .......... 12716.5
Last Reading For Entire File ........... 14715
File Trailer
Service name ............. STSLIB.001
First
Reading
12716.5
12748.5
12716.5
12720
12720
12720
12720
12748.5
Last
Reading
14715
14715
14685
14656
14656
14656
14656
14656
Service Sub Level Name...
Version Number ...........
Date of Generation ....... 02/04/11
Maximum Pkysical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.0C2
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 12716.5 12900.0
ROP 12748.5 12930.0
$
#
LOG HEADER DATA
DATE LOGGED: 25-DEC-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.5
DOWNHOLE SOFTWARE VERSION: 1.22
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 12930.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 43.5
MAXIMUM ANGLE: 71.7
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
NGP NATURAL GAMMA PROBE 002
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 3.750
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE: Flo Pro
MUD DENSITY (LB/G): 8.65
MUD VISCOSITY (S): 65.0
MUD PH: 8.5
MUD CHLORIDES (PPM): 22000
FLUID LOSS (C3): 5.2
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000 .0
MUD AT MAX CIRCULATING TERMPERATURE: .000 154.0
MUD FILTRATE AT MT: .000 .0
MUD CAKE AT MT: .000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REF~.RKS:
¢
Data Format Specification Record
Data Record Type .................. 0
Data Speclfication Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 12716.5 12930 12823.3 428
ROP MWD010 FT/H 15.45 187.81 48.8583 364
GR MWD010 API 22.49 1103.06 134.912 368
First Reading For Entire File .......... 12716.5
Last Reading For Entire File ........... 12930
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
First
Reading
12716.5
12748.5
12716.5
Last
Reading
12930
12930
12900
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
RPS 12720.0
RPM 12720.0
RPX 12720.0
RPD 12720.0
FET 12748.5
GR 12900.5
ROP 12930.5
STOP DEPTH
14103.5
14103.5
14103.5
14103.5
14103.5
14092.5
14138.5
LOG HEADER DATA
DATE LOGGEi:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE ,MEMORY OK REAL-TIME):
TD DRILLER
TOP LOG iNTERVAL {FT):
BOTTOM LOG INTERVAL (FT!:
BIT ROTATING SPEED (RPM}:
HOLE iNCLiNATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
27-DEC-00
Insite 4.05.5
4.27
Memory
14139.0
79.4
96.3
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PBO1743RF3
EWR4 ELECTROMAG. RESIS. 4 PBO1743RF3
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
3.750
BOREHOLE CONDITIONS
MUD TYPE: Flo Pro
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S): 65.0
MUD PH: 8.5
MUD CHLORIDES (PPM): 24000
FLUID LOSS (C3): 5.0
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .1.60
MUD AT MAX CIRCULATING TERMPERATURE: .066
MUD FILTRATE AT MT: .150
MUD CAKE AT MT: .18'0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order
Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68
ROP MWD020 FT/H 4 1 68
GR MWD020 API 4 1 68
RPX MWD020 OHMM 4 1 68
RPS MWD020 OHMM 4 i 68
RPM MWD020 OHMM 4 I 68
RPD MWD020 OHMM 4 1 68
FET MWD020 HR 4 1 68
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
70.0
180.0
70.0
70.0
Name Service Unit Min Max
DEPT FT 12720 14138.5
ROP MWD020 FT/H 0.76 994.12
Mean
13429.3
109.187
Nsam
2838
2417
First
Reading
12720
12930.5
Last
Reading
14138.5
14138.5
GR MWD020 APl 18.02 !65.48
RPX MWD020 OH~ 0.35 2000
RPS MWD02C OH.~M 0.i 2000
RPM .~D020 OHMS. 0.11 1853.04
RPP MWD020 OH._~M 0.15 1874.93
FET MWD02C HR 0.23 i4.18
41.453
11.5596
!4.9637
10.8139
12.1258
2.33398
First Reading For Eh=ire File .......... 12720
Last Reading For Entire File ........... 14138.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
2385
2768
2768
2768
2768
271~
12900.5
12720
12720
12720
i2r20
i2~48.5
14092.5
14103.5
14103.5
14103.5
14103.5
14103 ~
Physical EOF
File Header
Service name ............. STSLiB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 14093.0
ROP 14139.0
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
STOP DEPTH
14335.0
14367.0
30-DEC-00
Insite 4.05.5
1.22
Memory
14367.0
98.4
101.3
TOOL NUMBER
002
3.750
Flo Pro
8.70
65.0
9.5
MUD CHLORIDES (PPMI: 23500
FLUID LOSS (C3): 7.8
RESiSTIViTY (OH~M) AT TEMPERATURE ~DESF~
MU.- AT MEASURED TEMPERATURE (MTn: .000
MUr AT ¥~X CIRCULATING TERMPERATURE: .000
MUD FILTRATE AT MT: .00C
MUD CAKE AT MT: .000
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lIN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel '
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 i 68 4 2
GR MWD030 API 4 I 68 8 3
iE3.0
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 14093 14367 14230 549
ROP MWD030 FT/H 10.67 3116.33 120.97 457
GR MWD030 API 20.65 158.51 52.3795 485
First Reading For Entire File .......... 14093
Last Reading For Entire File ........... 14367
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
First
Reading
14093
14139
14093
Last
Reading
14367
14367
14335
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name,..
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER:
DEPTH INCREMENI:
FILE SU~V~RY
VENDOK TOOL T~DE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
4
.5000
START DEPTH
14104.0
14104.0
14104.0
14104.0
14104.0
14335.5
14367.5
STOP DEPTH
14656.0
14656.0
14656.0
14656.0
14656.0
14645.0
14690.C
31-DEC-00
Insite 4.05.5
4.27
Memory
14690.0
89.8
96.5
TOOL NUMBER
PBO1743RF3
PBO1743RF3
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
,HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order
DEPT
3.750
Flo Pro
8.70
65.0
9.5
24000
7.4
.190
.000
.320
.210
Units Size Nsam Rep Code Offset Channel
FT 4 I 68 0 1
67.0
165.0
67.0
67.0
ROF MWDC4C FT/H 4 i 68
GR MWD$40 API 4 i 68
RPX MWD04C OHMM 4 i 68
RPS MWD040 OHMM 4 I 68
RPM MWD04C OHMM 4 i 68
RPD MWD04C OHMM 4 i 68
FET MWD040 HR 4 ! 68
4 2
8 3
12 4
iE 5
20 6
24 7
28 8
Name Service Uni= Min Max
DEPT FT 14104 14690
ROP MWD040 FT/H 10.84 753.22
GR MWD040 APi 20.89 159.78
RPX MWD040 OHMM 1.96 17.71
RPS MWD040 OHMM 2.19 18.6
RPM MWD040 OHMS. 2.38 34.95
RPD MWD040 OHMM 3.45 20.05
FET MWD040 HR 0.43 81.49
First Reading For Entire File .......... 14104
Last Reading For Entire File ........... 14690
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name.2.
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
First
Mean Nsam Reading
14397 1173 14104
83.5658 646 14367.5
52.1738 620 14335.5
7.92625 1105 14104
8.79461 1105 14104
9.49698 1105 14104
10.7192 1105 14104
14.0205 1105 1.4104
Last
Reading
14690
14690
14645
14656
14656
14656
14656
14656
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files..
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 14645.5
ROP 14690.5
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT.):
TOP 'LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
14685.0
14715.0
01-JAN-01
Insite 4.05.5
1.22
Real-Time
14715.0
91.6
91.6
TOOL STRING 'TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL G~M~ PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 3.750
DRILLER'S CASING DEPTH (FTC:
BOREHOLE CONDITIONS
MUD TYPE: F10 Pro
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S): 65.0
MUD PH: 9.5
MUD CHLORIDES (PPM): 23500
FLUID LOSS (C3): 6.8
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000
MUD AT MAX CIRCULATING TERMPERATURE: .000
MUD FILTRATE AT MT: ,000
MUD CAKE AT MT: .000
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type .....
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point ............... Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size NsamRep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 i 68 4 2
GR MWD050 API 4 1 68 8 3
TOOL NUMBER
035
.0
180.0
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 14645.5 14715 14680.3 140
ROP MWD050 FT/H 2.29 103.37 24.731 50
GR MWD050 API 87.46 314.93 164.588 80
First Reading For Entire File .......... 14645.5
Last Reading For Entire File ........... 14715
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/04/11
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Firs~
Reading
14645.5
14690.5
14645.5
Last
Reading
14715
14715
14685
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 02/04/11
Origin ................... STS
Tape Name ................ UNKNOWK
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LiS Writing Library.
Reel Trailer
Service name ............. LiSTPE
Date ..................... 02/04/11
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File