Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
200-214
STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS KLULIVUD NOV 21 20 Form 10-404 Revised 04/2017�j !'� `yI ,yy y{,v��2 .��L.. 3 BAMS t'J NOV 2 2 2019 Submit Original Only 12 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Op�t�n Q�i ❑ Suspend ❑ Perforate m Other Stimulate ❑ Alter Casing ❑ ChangeApprovedProgram ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Well Work Platform 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 200-214 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-21686-01-00 1 7 Property Designation (Lease Number): ADL 028281 8. Well Name and Number: PBU J -24A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 13728 feet Plugs measured None feel true vertical 8694 feet Junkmeasured 8377, 10548 feet Effective Depth: measured 13728 feet Packer measured 10377,10516 feet true vertical 6694 feet Packer true vertical 8268, 8368 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 42-122 42-122 Surface 2659 13-3/8" 42-2701 42-2682 5380/6390 2670 / 3470 Intermediate 10803 9-5/8" 40-10843 40-8610 6870 4760 Liner 306 7" 10557 - 10863 8398-8624 7240 5410 Liner 3155 3-3/16" x 2-7/8" 10573 - 13728 8409-8694 8430 7500 Perforation Depth: Measured depth: 13061 - 12400 feet True vertical depth: 8664-8694 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6#, 13Cr80 / L-80 38-10611 38-8437 4-1/2" Baker S-3 Penn Packer 10377 8268 Packers and SSSV (type, measured and 4-1/2" TIW HBBP Packer 10516 8368 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 416 16089 30 0 224 Subsequent to operation: Shut In 50 0 14. Attachments: (required ver20 MC 25.070.25.071, &25,283) 15. Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil RI Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319405 Authonzed Name: Thompson, Ryan Contact Name: Thompson, Ryan Authorized Title: Petroleum Engineer Contact Email: RYAN.THOMPSON@bp.com Authorized Signature: //✓ Date. if 1 y0/161 Contact Phone: +1 907 564 4535 Form 10-404 Revised 04/2017�j !'� `yI ,yy y{,v��2 .��L.. 3 BAMS t'J NOV 2 2 2019 Submit Original Only Daily Report of Well Operations PBU J -24A ArTNITvnATP ... ...... __. 10/30/2019 CTU 9 w/ 1.75" coil Objective: Adperf Complete seven day BOP test after replacing annular bag. MU & RIH w/ HES mem log in carrier w/ 2.25" JSN. Log from 12700' up to 11000'. PAINTED RED & WHITE FLAG @ 11900'. POOH. Cap well w/ ten bbls 60/40 methanol. CTU 9 w/ 1.75" coil ***Continue from 10/31/19*** Objective: Adperf Kill well w/ 260 bbls Slick 1 % KCI w/ Safelube. Perform flow check, no flow. Begin continuous hole fill method then swap to pumping across the top. Notify superintendent & begin deployment. Deployed perforating BHA. Corrected dept off of the flag and perforated 11916-12400. POOH. Kill well w/ 265 bbls Slick 1% KCI w/ Safelube. Perform flow check, no flow. egi�"� n'pumping across the top. Notify superintendent & begin undeployment. Freeze protect well w/ 38 bbls 60/40 methanol 11/1/2019 ***Job in Pro ress**" CTU 9 w/ 1.75" coil ***Continue from 11/01/19*** Objective: Adperf Complete rig down. 11/2/2019 ***Job Com lete*** VVE L EAD= WEVOY ACTUATOR= AXELSON KB. E_EV = 79.2' BF. EL17 = 41.2' KOP= 1700' Max Angle = 101 @1 1OW Datum MJ = NA Datum TVD-- 8800' 13-318" CSG, 72#, L-80 BTRS, D = 12.347" 2701' Minimum ID = 2.25" @ 13057' DIVERTER SUB (MILLED) 4 1/2" TBG, 12.6#, 13CR80 VAM TOP, .0152 bpf, ID = 3.958" ftSFI• RIC LATCH (11/08/07)?? SAFETY NOTES: •'•4-112 CHROME TBG*** J -24A11-INERI FROMSBLEC 220006 RWOPOSITEPLUG DEBRIS ABOVE 24' 7" X 4-1/2" XO, D = 3.958" 2117' –X–N–F–j–D–=-3–.8–j-3- TOP OF 7" LNR 10557' 4 1/2" TBG, 12.6#, L-80, BTC, 10611' .0152 bpf, D = 3.958" 9-5/8" CSG, 47#, L-80,BTRS, D=8.681 10843' 10860' TOPW TOCK 6.276" PERFORATION SUMMARY REF LOG_ ANGLE AT TOP PERF: 87'@ 11916' Note: Refer to Production DBfortdstorical erfdaha SIZE= I SPF INTERVAL rY5 z DATE SLOTTED 13061-13726 SLTD 02/02/01 2" 6 11916-12400 O 11/01/19 4 3227 3147 3: MMG ORIGINAL COMPLETION RK 16 3 619 go 5305 4 MNIG SO RK 0 ��1 1102766 892 MMG I I 106/13/0 45 MMG D�MY RTIC 00 STA #2 - RK LATCH BROKE OFF 10341' 4-1/2" HES X NP, ID = 3.813' — 10362' 9-5/8" X 4-1/2" BKR S3 TCR, D = 3.875' 10386' 412" HES X NP, ID = 3.813" � 10453' TBG STIR (06/11/05 dMS) 10458' 9-5/8' X 4-1/2' UNIQUE OV BTSFDT (BTM) 10496'TOPOF BPR 10516' 9-5/8" RCR (TIW HBBP) D= 4.750" 10548' 4-12' OTHS X NP, D = 3.813" 10548' PLUG DEBRIS (07/03/051- SEE SAFETY NOTE N DEPLOYMENT SUB, D = 1/2" X 3-3/16 XO, —D= 2.79 112" OTIS XN NP, MLLED = 3.80" (BEHIND PIPE) 112" TUBING TAIL (BEM EM- LOGGED i35' J--tTTED TOC MILLOITT WINDOW 10863' - 10865' 10897 3-3/16" X 2-7/8" XO, D = 2.44" I DIV BUE2 SUB, MILLED D = 2.251 I EST. BTM OF C Wr I 1 ♦ � 3-3116" LW 6-2#, L-80 10897 ♦♦ ♦♦ TCI 1, .0076 bpf, ID=2.79" ♦♦♦ ♦♦♦ 2-718" SOLD LNR, 6.16#, 12956' ♦♦ ♦♦♦ L-80 STL, ID=2.44" ♦♦ 2-7/8' SLOTTED LNR, 6.76#, L-80 STL, D = 2.44" 13726' [TO I 13728' DATE REV BY COMMENTS DATE REVBY COMMENTS 02MS187 ORIGINAL COMPLETION 02/09)08 KSB/PJC FISH -RK LATCH 11/08!07 02/18101 Whitlow CTD HORIZSDTRK, LINERS 11/42019 JTMIJMD ADPERFS (11/01/19 06/14)05 D18 RWO 0626106 TWS/PJC GLV C/O 0828/06 CAZ/TLH DRLG DRAFT CORRECTDNS 0IM5)07 CAZ/TLH DRLG DRAFT FINALIZED PRUGHOE BAYUNIT WELL J -24A PERMR No:'1002140 API No: 50-029-21686-01 BP Exploration (Alaska) THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Ryan Thompson Interventions Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J -24A Permit to Drill Number: 200-214 Sundry Number: 319-105 Dear Mr. Thompson: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 v .aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this 6/ day of March, 2019. P,�01 ti019 90005 ? STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Bid CUt�VtU 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend Perforate 0 Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Rednll ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other Well Work Platform 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0 • 5. Permit to Drill Number: 200-214 3, Address: P.O. Box 196612 Anchorage, AK 99519-8812 Streligrephic ❑ Service ❑ 8. API Number: 50-029-21686-01-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? , Will planned perforations require a spacing exception? Yes ❑ No 0 PBU J -24A 9. Property Designation (Lease Number): 10, Field/Pools ADL 0028281 PRUDHOE BAY. PRUDHOE OIL 11, PRESENT WELL CONDITION SUMMARY Total Depth MD (8): Total Depth TVD(ft) : Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 13728 8694 13728 8694 1734 None 8377,10548 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 42-122 42-122 Surface 2659 13-3/8" 42-2701 42-2682 5380/6390 2670/3470 Intermediate 10803 9-5/8" 40-10843 40 - 8609 6870 4760 Liner 306 7" 10557 - 10863 8398 - 8824 7240 5410 Liner 3155 3-3/16" x 2-7/8" 10573 - 13728 8409-8694 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 13061 - 13726 8694-8694 4-1/2" 12.8# 1301 / L-80 38-10611 Packers and SSSV Type: 4-1/2" Baker S-3 Peon Packer Packers and SSSV MD (ft) and TVD (ft): 10377/8268 41/2" TI W HBBP Packer 10516 / 8368 12. Attachments: Proposal Summary 0 Wellbore Schematic 0 13, Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ Stratigrephic ❑ Development 0 • Service ❑ 14. Estimated Date for Commencing Operations: May 1, 2019 15. Well Status after proposed work: Oil 0 WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date. GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Thompson, Ryan be deviated from without prior written approval. Contact Email: RYAN.THOMPSON@bp.com Authorized Name: Thompson, Ryan Contact Phone: +1 907 564 4535 Authorized Title: Interventions Engineer_ Authorized Signature: Date: % /5-/ / 9 COMMISSION USE ONLY Conditions of approval: Notify Commission sothata representative may witness Sundry Number: /•/, (_^I Plug Integrity ❑ BOP Test yY Mechanical Integrity Test ❑ Location Clearance ❑ Other: sape •TE•ST I'm 35"c® PS ) Post Initial Injection MIT Req'd? Yes ❑ No ❑/- Spacing Exception Re fired? Yes ❑ No Subsequent Form Required: � D -a40 "t APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date: (7 / A �� Form 10-403 Revised 04/2017 0 R I G I N A L 611,11avw T"—wast! FWe�F•)9 Submit Form and Approved application is valid for 12 months from the date of approval. AtlachmeM in Duplicate Sundry Request to Perforate Utilizing The Well Work Platform Well: J -24A Date: 2/28/19 Engineers: Julie Wellman: 907-564-4657 Ryan Thompson: 907-564-4535 MASP: 1734 Well Type: Producer Estimated Start date: May 1, 2019 History: J -24A was CTD sidetracked in February 2001 with 665' of slotted liner ran as part the completion. Scope of Work: The objective of this intervention is to utilize Service Coil and the Well Work Platform to perforate a proposed additional 484' of perforations above the slotted liner. Proposed WWP Procedure: MIRU WWP, BOPE and support equipment / r nc r `� MIRU CTU Z 7 ` - t 1+ • Test BOPE as configured top down (annular, blind shears, 1.75" pipe/slips, mud cross, empty cavity, 1.75" pipe/slips). Test the blind shears and pipe slips to 3500 psi and the annular to 2500 psi using 1.75" coil. Perform drift run. • Kill well with 1 % KCL • Perforate the proposed interval below. Safetyjoint with FOSV will be on floor during gun deployment and laydown. 11,916' — 12,400' MD • RDMO WWP and Coil Unit Current Wellbore Configuration MEE= C04'6" WELLHEAD,- FLEVOY AC UAMR= AXELSON KB. ELEb' = 79.2 BF. ELF -'J = 412 KOP= 170:( hH AngO = 101 @ 11096 Dwt FC = NA Dwt Z Mw 13-79. MEn.L-8081 Minimum ID= 225" §13057' DNERTER SUB (MILLED) A 152 bpi. C = 3.958' 4 1:7 78G. 12 64. L440, 8TC 0152 boy 10 - M6R' I rLfR 268. L-M.D=6.76' H 117W PERFOR"N sLm%RY REF LOG: ANCLEAT TOP PERF �bte: Refer b P dWtun DB fm hsb.w of dale A I POSSBLE COM POSITE PL UG DEBRS ABOVE t1NEREROM 2005 RWo ISTAI FC I TVDIDEVITYPEI VLV ILATCHIPORTI DATE 4 3227 314] 33 AMG OCFE RK 16 .2f➢'0.i 3 6190 5305 4B FfdG SO RK 20 0626105 ..2 8396 6849 44 MAG ^OMf RK 0 06113/06 ImIalos 1 ,0271 8192 45 MAG fJMY RK J -SPA C2 -1d( LA'+ N BROKE OFF =3.W' MILLOUT WDDOW 10867 - 10865 LNL 6.28, L-80 .0076 bpf, D = 2.79' � 2-L8' SCLD 7416':j t6.168. L-80 SR, ID 2.44 2-718'SLOTTEDLNR G. IM. L-80 M, D=244' ,{ DATE REJ BY I CCCCEtfS DATE I REV BY I-. 8. 02A8f87 ORUNAL COMPLETION 021MMS KSB/PJC FISH-WLam`. _v - 02-8R7. !Una SOPFO(. LIPFIS 06-406 WNUU 016 0626106 TW9'PJC GLV C7O 082&00 CAZ7P OFTG ORAE'LT OOTrjw OtAS('07 CALTLH DFIG CRAF RIALeED PRCHOE BAY UtT WELL: 124A FERW b'. '-'WD40 AMN o: 54029-21686-01 BP 6Plorsto (Alaska( Planned Wellbore Configuration Post Perforating J -24A I == PLUG DEERLSABOVE ' 11,916 - 12,400' 11 2-7IB' SLOTT® LW 6.16*, L-80 SR. D - 2.41' ?D LATE REV BY 1 L kP£NP' I DALE I REV BY 1CSJM16fHdF5 02A8l87=MIALCOIMALCOM PLEr IDN 02109M KSB'PJC RSH -FM LAT [I IMMIj 02 a R¢ SOTRR, UNERSWITZ 5062&106 O082&r16 RAFT ODRR�1'cmDIMS p RAF"FPLALQBJ PRIDHOE BAY UNT WELL J 24A FMW W:'NW2140 APIM, 50.02621686-01 TI I N R13E. SW RL & BM' FEL BP api.d. (Alaska( P-Tolan . Pa,rwm Fwr P4svzDISKnfrcr Armiar tt.1YaulcalH AtfuareA Valve Co, k'iDuSi.D �WMWAIWII-:W IWM IWill Ilm� t6rvVCsaIy o Cni FloeStD 1' 7 x 75Frx* a s rwe•2»: Fines Coos S5V mistw V3Y? 7HA. Tub'ig Head Grand Lw • gyrodata Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 August 1, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: J-Pad, Well #J-24A Prudhoe Bay, Alaska • ~p~~ ~..4~-V' Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, i f~/ A~, . /! ~,~,~ Rob Shoup North American Regional Manager RS:tf Serving the Worldwide Energy Industry with Precision Survey Instrumentation gy data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 CEP 1 ~ 1.QQ~ SURVEY REPORT BP J-Pad #J-24A Wellhead Prudhoe Bay, AK AK0608G_134 27 Jun 2008 r ~ { ~~~ ~ Ca ~'~iz:~. ~~~rK1j~s~~ a,~3 ~ ~ ,; P"n~'a7~t~~ ~~ 4 Serving the Worldwide Energy Industry with Precision Survey Instrumentation a~ ~ o - ~'~ A Gyrodata Directional Survey for BP EXPLORATION (ALASKA) INC. Lease: J-Pad Well: J-24A, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 Run Date: 27 Jun 2008 Surveyor: Steve Thompson Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.327680 deg. N Longitude: 148.835680 deg. W Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location • • Horizontal Coordinates Calculated from Well Head Location BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. A Gyrodata Directional Survey BORE HOLE BEARING deg. min. DOGLEG SEVERITY deg./ 100 ft. VERTICAL CLOSURE HORIZONTAL DEPTH DIST. AZIMUTH COORDINATES feet feet deg. feet 0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 0.00 N 0.00 E 0 - 10500 FT. RATE CONTINUOUS MULTISHOT SURVEY RUN INSIDE 4-1/2" TUBING MEASURED DEPTHS ARE REFERENCED TO THE ORIGINAL R.K.B. AT 79.2 FT AMSL AND A BASE FLANGE OF 41.2 FT AMSL 100.00 0.13 62.82 N 62 49 E 0.13 100.00 0.1 62.8 0.05 N 0 10 E 200.00 0.13 112.27 S 67 44 E 0.11 200.00 0.3 78.8 0.06 N . 0 31 E 300.00 0.11 133.39 S 46 37 E 0.05 300.00 0.5 95.7 0.05 S . 48 E 0 400.00 0.11 111.92 S 68 5 E 0.04 400.00 0.7 103.2 0.15 S . 0 64 E 400.00 0.23 79.25 N 79 15 E 0.00 400.00 0.7 103.2 0.15 S . 0.64 E 500.00 0.11 139.87 S 40 8 E 0.20 500.00 0.9 101.7 0 19 S 0 90 E 600.00 0.15 140.46 S 39 32 E 0.04 600.00 1.1 109.0 . 0.36 S . 1 04 E 600.00 0.22 122.38 S 57 37 E 0.00 600.00 1.1 109.0 0.36 S . 1 04 E 700.00 0.23 142.88 S 37 7 E 0.08 700.00 1.5 115.1 0.62 S . 1 33 E 800.00 0.14 102.07 S 77 56 E 0.15 800.00 1.8 117.3 0.81 S . 1.57 E 800.00 0.05 142.29 S 37 43 E 0.00 800.00 1.8 117.3 0.81 S 1 57 E 900.00 0.17 152.41 S 27 35 E 0.12 900.00. 1.9 120.4 0.97 S . 1 66 E 1000.00 0.03 121.38 S 58 37 E 0.15 1000.00 2.1 122.5 1.12 S . 1 75 E 1000.00 0.17 104.14 S 75 52 E 0.00 1000.00 2.1 122.5 1.12 S . 1 75 E 1100.00 0.11 332.03 N 27 58 W 0.26 1100.00 2.1 120.0 1.07 S . 1.85 E 1200.00 0.10 313.05 N 46 57 W 0.04 1200.00 2.0 118.0 0.93 S 1 74 E 1200.00 0.11 17.71 N 17 43.E 0.00 1200.00 2.0 118.0 0.93 S . 1 74 E 1300.00 0.11 264.54 S 84 32 W 0.18 1300.00 1.9 116.7 0.84 S . 1 68 E 1400.00 0.14 254.85 S 74 51 W 0.04 1400.00 1.7 121.2 0.89 S . 1 47 E 1400.00 0.19 211.99 S 31 59 W 0.00 1400.00 1.7 121.2 0.89 S . 1.47 E 1500.00 0.17 252.96 S 72 58 W 0.13 1500.00 1.6 130.9 1.07 S 1 24 E 1600.00 0.17 251.78 S 71 47 W 0.00 1600.00 1.5 140.6 1.16 S . 0.95 E • 2 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 1600.00 0.13 270.53 N 89 28 W 0.00 1600.00 1.5 140.6 1.16 S 0 95 E 1700.00 0.14 95.37 S 84 38 E 0.27 1700.00 1.5 140.6 1.17 S . 0 96 E 1800.00 2.06 86.38 N 86 23 E 1.92 1799.97 3.1 110.4 1.07 S . 2.88 E 1800.00 2.05 89.71 N 89 43 E 0.00 1799.97 3.1 110.4 1.07 S 2 88 E 1900.00 2.60 92.47 S 87 32 E 0.56 1899.89 7.0 99.5 1.16 S . 6 93 E 2000.00 3.94 80.81 N 80 49 E 1.49 1999.73 12.6 93.2 0.71 S . 12 59 E 2000.00 4.33 79.21 N 79 13 E 0.01 1999.73 12.6 93.2 0.71 S . 12 59 E 2100.00 6.46 76.96 N 76 58 E 2.14 2099.28 21.8 86.7 1.27 N . 21.78 E 2200.00 8.34 75.21 N 75 13 E 1.89 2198.44 34.6 82.7 4.39 N 34 27 E 2200.00 8.53 75.20 N 75 12 E 0.00 2198.44 34.6 82.7 4.39 N . 34 27 E 2300.00 10.00 72.28 N 72 17 E 1.54 2297.13 50.5 79.8 8.93 N . 49 71 E 2400.00 12.72 54.65 N 54 39 E 4.38 2395.19 69.3 75.0 17.95 N . 66 97 E 2400.00 12.58 56.25 N 56 15 E 0.01 2395.19 69.3 75.0 17.95 N . 66.97 E 2425.00 13.70 51.09 N 51 5 E 6.48 2419.54 74.6 73.4 21.32 N 71 54 E 2450.00 14.23 49.16 N 49 10 E 2.82 2443.80 80.2 71.7 25.19 N . 76 17 E 2475.00 15.38 46.03 N 46 2 E 5.60 2467.97 86.1 70.0 29.50 N . 80 88 E 2500.00 16.24 44.26 N 44 16 E 3.94 2492.03 92.3 68.2 34.30 N . 85 71 E 2525.00 17.02 42.37 N 42 22 E 3.80 2515.98 98.9 66.4 39.51 N . 90.61 E 2550.00 17.82 40.25 N 40 15 E 4.08 2539.83 105.7 64.7 45.13 N 95 55 E 2575.00 18.55 37.94 N 37 56 E 4.10 2563.58 112.8 63.0 51.19 N . 100 47 E 2600.00 19.07 35.55 N 35 33 E 3.72 2587.25 120.0 61.3 57.65 N . 105 28 E 2625.00 19.38 33.20 N 33 12 E 3.33 2610.86 127.4 59.6 64.44 N . 109 93 E 2650.00 19.75 29.69 N 29 41 E 4.93 2634.41 134.9 57.9 71.58 N . 114.29 E 2675.00 20.00 27.79 N 27 47 E 2.77 2657.92 142.3 56.3 79.03 N 118 38 E 2700.00 20.47 24.86 N 24 52 E 4.47 2681.38 149.9 54.6 86.78 N . 122 21 E 2725.00 20.93 24.44 N 24 26 E 1.93 2704.77 157.6 53.0 94.81 N . 125 90 E 2750.00 21.07 24.19 N 24 11 E 0.66 2728.11 165.5 51.5 102.98 N . 129.58 E • 3 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4 -1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg, feet 100 ft. 2775.00 21.66 23.27 N 23 16 E 2.71 2751.39 173.6 50.1 111.32 N 133.25 E 2800.00 22.86 19.39 N 19 23 E 7.59 2774.53 182.0 48.7 120.14 N 136.68 E 2825.00 23.43 17.37 N 17 22 E 3.91 2797.52 190.5 47.2 129.46 N 139.78 E 2850.00 24.03 15.75 N 15 45 E 3.54 2820.40 199.2 45.7 139.10 N 142.65 E 2875.00 25.39 14.59 N 14 35 E 5.78 2843.11 208.3 44.3 149.19 N 145.38 E 2900.00 26.54 13.66 N 13 40 E 4.88 2865.59 217.8 42.8 159.81 N 148.05 E 2925.00 27.58 13.22 N 13 13 E 4.24 2887.85 227.8 41.4 170.87 N 150.69 E 2950.00 28.50 13.20 N 13 12 E 3.68 2909.92 238.2 40.1 182.31 N 153.38 E 2975.00 29.52 12.78 N 12 47 E 4.16 2931.78 249.1 38.8 194.12 N 156.10 E 3000.00 29.84 12.75 N 12 45 E 1.28 2953.50 260.3 37.6 206.19 N 158.83 E 3025.00 30.27 12.79 N 12 47 E 1.72 2975.14 271.7 36.5 218.41 N 161.60 E 3050.00 30.57 12.76 N 12 46 E 1.20 2996.70 283.3 35.5 230.75 N 164.40 E 3075.00 30.80 12.81 N 12 49 E 0.93 3018.20 295.1 34.5 243.19 N 167.22 E 3100.00 31.19 12.88 N 12 53 E 1.57 3039.63 307.1 33.6 255.74 N 170.09 E 3125.00 31.44 12.69 N 12 41 E 1.08 3060.98 319.3 32.8 268.42 N 172.96 E 3150.00 31.75 12.74 N 12 44 E 1.24 3082.28 331.6 32.0 281.19 N 175.85 E 3175.00 32.07 12.71 N 12 43 E 1.28 3103.50 344.1 31.3 294.08 N 178.76 E 3200.00 32.38 12.64 N 12 38 E 1.25 3124.65 356.8 30.6 307.09 N 181.68 E 3225.00 32.83 12.70 N 12 42 E 1.80 3145.71 369.6 30.0 320.23 N 184.64 E 3250.00 34.19 12.39 N 12 23 E 5.48 3166.55 382.8 29.3 333.70 N 187.63 E 3275.00 35.00 12.40 N 12 24 E 3.24 3187.13 396.4 28.7 347.57 N 190.68 E 3300.00 36.62 12.83 N 12 50 E 6.56 3207.41 410.5 28.2 361.84 N 193.88 E 3325.00 37.34 12.74 N 12 44 E 2.89 3227.38 425.0 27.6 376.51 N 197.20 E 3350.00 38.00 13.03 N 13 2 E 2.73 .3247.17 439.8 27.1 391.40 N 200.61 E 3375.00 38.42 12,92 N 12 55 E 1.70 3266.81 454.8 26.7 406.47 N 204.08 E 3400.00 38.98 13.16 N 13 10 E 2.32 3286.32 470.0 26.2 421.70 N 207.61 E • ;~ 4 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4 -1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 3425.00 39.78 13.33 N 13 20 E 3.23 3305.64 485.5 25.8 437.14 N 211.24 E 3450.00 40.61 13.62 N 13 37 E 3.40 3324.74 501.3 25.4 452.83 N 215.00 E 3475.00 41.02 13.52 N 13 31 E 1.66 3343.66 517.3 25.0 468.71 N 218.84 E 3500.00 41.49 13.69 N 13 41 E 1.93 3362.46 533.4 24.7 484.73 N 222.72 E 3525.00 41.50 13.77 N 13 46 E 0.22 3381.18 549.7 24.3 500.82 N 226.65 E 3550.00 41.39 14.15 N 14 9 E 1.10 3399.92 566.0 24.0 516.88 N 230.64 E 3575.00 41.66 14.05 N 14 3 E 1.11 3418.64 582.3 23.8 532.96 N 234.68 E 3600.00 41.71 14.43 N 14 26 E 1.03 3437.31 598.7 23.5 549.07 N 238.77 E 3625.00 41.63 14.67 N 14 40 E 0.71 3455.98 615.2 23.3 565.16 N 242.94 E 3650.00 41.68 14.79 N 14 47 E 0.38 3474.66 631.6 23.0 581.23 N 247.17 E 3675.00 41.52 15.22 N 15 13 E 1.31 3493.36 648.0 22.8 597.26 N 251.46 E 3700.00 41.45 15.23 N 15 14 E 0.28 3512.09 664.5 22.6 613.24 N 255.81 E 3725.00 41.48 15.65 N 15 39 E 1.12 3530.82 680.9 22.5 629.20 N 260.22 E 3750.00 41.56 15.63 N 15 38 E 0.32 3549.54 697.3 22.3 645.16 N 264.69 E 3775.00 41.61 15.79 N 15 47 E 0.47 3568.24 713.8 22.2 661.13 N 269.18 E 3800.00 41.55 15.74 N 15 44 E 0.27 3586.94 730.3 22.0 677.10 N 273.69 E 3825.00 41.44 15.41 N 15 25 E 0.98 3605.66 746.8 21.9 693.05 N 278.14 E 3850.00 41.86 15.44 N 15 26 E 1.68 3624.34 763.3 21.7 709.07 N 282.55 E 3875.00 41.99 15.46 N 15 28 E 0.52 3642.94 779.9 21.6 725.17 N 287.00 E 3900.00 42.07 15.22 N 15 13 E 0.72 3661.51 796.5 21.5 741.31 N 291.43 E 3925.00 42.02 15.40 N 15 24 E 0.52 3680.08 813.2 21.3 757.46 N 295.85 E 3950.00 41.95 15.78 N 15 47 E 1.05 3698.66 829.8 21.2 773.57 N 300.35 E 3975.00 41.19 17.13 N 17 8 E 4.70 3717.37 846.4 21.1 789.48 N 305.04 E 4000.00 40.86 17.91 N 17 55 E 2.44 3736.23 862.7 21.1 805.12 N 309.98 E 4025.00 40.77 18.53 N 18 32 E 1.66 3755.15 879.1 21.0 820.64 N 315.09 E 4050.00 40.69 18.74 N 18 44 E 0.63 3774.09 895.4 21.0 836.10 N 320.31 E 4075.00 40.81 18.74 N 18 44 E 0.48 3793.03 911.7 20.9 851.56 N 325.55 E 5 • A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4 -1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 4100.00 40.92 18.49 N 18 29 E 0.79 3811.94 928.0 20.9 867.06 N 330 77 E 4125.00 41.30 18.44 N 18 26 E 1.53 3830.77 944.4 20.8 882.65 N . 335 98 E 4150.00 41.38 18.45 N 18 27 E 0.32 3849.54 960.9 20.8 898.31 N . 341.20 E 4175.00 41.34 18.42 N 18 25 E 0.18 3868.31 977.4 20.8 913.98 N 346 42 E 4200.00 41.46 18.37 N 18 22 E 0.50 3887.06 994.0 20.7 929.67 N . 351 64 E 4225.00 41.40 18.69 N 18 41 E 0.88 3905.80 1010.5 20.7 945.36 N . 356 90 E 4250.00 41.38 19.00 N 19 0 E 0.82 3924.56 1027.0 20.7 961.00 N . 362 24 E 4275.00 41.29 19.24 N 19 14 E 0.73 3943.33 1043.5 20.6 976.60 N . 367.65 E 4300.00 41.33 19.46 N 19 28 E 0.60 3962.11 1060.0 20.6 992.17 N 373 11 E 4325.00 41.58 19.53 N 19 32 E 1.02 3980.85 1076.6 20.6 1007.77 N . 378 64 E 4350.00 41.33 19.40 N 19 24 E 1.06 3999.58 1093.1 20.6 1023.38 N . 384 15 E 4375.00 41.52 19.32 N 19 19 E 0.79 4018.33 1109.6 20.6 1038.99 N . 389 64 E 4400.00 41.47 19.39 N 19 23 E 0.27 4037.06 1126.2 20.5 1054.61 N . 395.13 E 4425.00 41.13 19.27 N 19 16 E 1.40 4055.84 1142.7 20.5 1070.18 N 400 59 E 4450.00 41.50 19.34 N 19 20 E 1.49 4074.61 1159.2 20.5 1085.76 N . 406 04 E 4475.00 41.57 19.28 N 19 17 E 0.32 4093.33 1175.8 20.5 1101.40 N . 411 53 E 4500.00 41.85 19.28 N 19 17 E 1.12 4111.99 1192.4 20.5 1117.11 N . 417 02 E 4525.00 41.86 19.20 N 19 12 E 0.22 4130.61 1209.1 20.5 1132.85 N . 422.52 E 4550.00 41.99 19.25 N 19 15 E 0.54 4149.21 1225.8 20.4 1148.63 N 428 02 E 4575.00 42.34 19.47 N 19 28 E 1.52 4167.74 1242.6 20.4 1164.46 N . 433 58 E 4600.00 42.20 20.01 N 20 1 E 1.56 4186.24 1259.4 20.4 1180.29 N . 439 26 E 4625.00 42.01 20.72 N 20 43 E 2.05 4204.79 1276.1 20.4 1196.00 N . 445 09 E 4650.00 41.91 20.85 N 20 51 E 0.53 4223.38 1292.9 20.4 1211.63 N . 451.02 E 4675.00 42.19 21.03 N 21 2 E 1.22 4241.94 1309.6 20.4 1227.27 N 457 01 E 4700.00 42.12 21.35 N 21 21 E 0.90 4260.48 1326.4 20.4 1242.91 N . 463 07 E 4725.00 41.96 21.72 N 21 43 E 1.18 4279.05 1343.1 20.4 1258.48 N . 469 22 E 4750.00 42.34 22.08 N 22 5 E 1.80 4297.58 1359.9 20.5 1274.05 N . 475.47 E s C 6 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4 -1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH BORE HO LE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min . deg./ feet feet deg. feet 100 ft. 4775.00 42.23 22.67 N 22 40 E 1.65 4316.08 1376.7 20.5 1289.60 N 481.88 E 4800.00 42.05 23.09 N 23 5 E 1.34 4334.61 1393.5 20.5 1305.06 N 488.40 E 4825.00 42.09 23.47 N 23 28 E 1.03 4353.17 1410.2 20.6 1320.45 N 495 02 E 4850.00 41.96 23.39 N 23 23 E 0.56 4371.74 1426.9 20.6 1335.80 N . 501 67 E 4875.00 42.54 23.51 N 23 31 E 2.34 4390.25. 1443.7 20.6 1351.22 N . 508 36 E 4900.00 42.80 23.41 N 23 25 E 1.07 4408.63 1460.6 20.7 1366.77 N . 515.11 E 4925.00 43.38 23.56 N 23 34 E 2.36 4426.89 1477.7 20.7 1382.43 N 521 92 E 4950.00 43.53 23.43 N 23 26 E 0.70 4445.03 1494.8 20.7 1398.20 N . 528 77 E 4975.00 43.79 23.47 N 23 28 E 1.05 4463.12 1512.1 20.7 1414.03 N . 535 64 E 5000.00 43.99 23.34 N 23 20 E 0.88 4481.14 1529.4 20.8 1429.94 N . 542 52 E 5025.00 43.95 23.41 N 23 25 E 0.25 4499.13 1546.7 20.8 1445.87 N . 549.41 E 505.0.00 44.31 23.48 N 23 29 E 1.45 4517.07 1564.1 20.8 1461.84 N 556 34 E 5075.00 44.44 23.55 N 23 33 E 0.56 4534.94 1581.6 20.9 1477.87 N . 563 31 E 5100.00 44.71 23.85 N 23 51 E 1.37 4552.75 1599.1 20.9 1493.94 N . 570 36 E 5125.00 44.64 23.89 N 23 53 E 0.30 4570.53 1616.7 20.9 1510.01 N . 577 48 E 5150.00 44.83 24.04 N 24 2 E 0.87 4588.29 1634.2 21.0 1526.09 N . 584.62 E 5175.00 45.01 24.14 N 24 8 E 0.77 4605.99 1651.9 21.0 1542.21 N 591.83 E 5200.00 45.15 24.42 N 24 25 E 0.97 4623.64 1669.5 21.0 1558.34 N 11 E 599 5225.00 45.11 24.36 N 24 22 E 0.23 4641.28 1687.2 21.1 1574.48 N . 606.42 E 5250.00 44.96 24.36 N 24 22 E 0.60 4658.95 1704.9 21.1 1590.59 N 613.72 E 5275.00 44.79 24.18 N 24 11 E 0.85 4676.66 1722.5 21.1 1606.67 N 620.97 E 5300.00 44.50 24.15 N 24 9 E 1.16 4694.45 1740.0 21.2 1622.70 N 628 16 E 5325.00 44.41 24.18 N 24 11 E 0.37 4712.30 1757.5 21.2 1638.68 N . 635 33 E 5350.00 44.73 24.17 N 24 10 E 1.28 4730.11 1775.0 21.2 1654.68 N . 642 52 E 5375.00 44.67 24.04 N 24 2 E 0.44 4747.88 1792.6 21.2 1670.73 N . 70 E 649 5400.00 44.76 24.11 N 24 7 E 0.41 4765.64 1810.2 21.3 1686.79 N . 656.87 E • 7 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4 -1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 5425.00 45.20 24.32 N 24 19 E 1.86 4783.33 1827.8 21.3 1702.91 N 664.12 E 5450.00 45.25 24.40 N 24 24 E 0.30 4800.93 1845.6 21.3 1719.08 N 671.44 E 5475.00 45.50 24.42 N 24 25 E 1.00 4818.50 1863.3 21.4 1735.28 N 678.79 E 5500.00 45.53 24.50 N 24 30 E 026 4836.01 1881.1 21.4 1751.51 N 686.18 E 5525.00 45.44 24.41 N 24 25 E 0.44 4853.54 1898.9 21.4 1767.74 N 693.56 E 5550.00 45.50 24.49 N 24 29 E 0.33 4871.07 1916.7 21.5 1783.97 N 700.94 E 5575.00 45.68 24.45 N 24 27 E 0.73 4888.57 1934.6 21.5 1800.22 N 708.33 E 5600.00 45.65 24.48 N 24 29 E 0.15 4906.04 1952.4 21.5 1816.50 N 715.74 E 5625.00 46.09 24.60 N 24 36 E 1.79 4923.45 1970.3 21.5 1832.82 N 723 19 E 5650.00 46.11 24.89 N 24 53 E 0.84 4940.78 1988.3 21.6 1849.18 N . 730.73 E 5675.00 46.31 25.14 N 25 8 E 1.08 4958.08 2006.3 21.6 1865.53 N 738 36 E 5700.00 46.42 25.42 N 25 25 E 0.92 4975.33 2024.4 21.6 1881.89 N . 746 09 E 5725.00 46.30 25.50 N 25 30 E 0.53 4992.59 2042.4 21.7 1898.23 N . 753 87 E 5750.00 46.48 25.45 N 25 27 E 0.73 5009.83 2060.5 21.7 1914.57 N . 761 65 E 5775.00 46.57 25.69 N 25 41 E 0.78 5027.03 2078.6 21.7 1930.94 N . 769.48 E 5800.00 46.88 25.70 N 25 42 E 1.24 5044.17 2096.8 21.8 1947.34 N 777.37 E 5825.00 46.90 25.65 N 25 39 E 0.17 5061.25 2115.0 21.8 1963.79 N 785 28 E 5850.00 47.01 25.86 N 25 52 E 0.76 5078.32 2133.2 21.8 1980.24 N . 793.22 E 5875.00 47.34 26.07 N 26 4 E 1.46 5095.31 2151.5 21.9 1996.73 N 801 25 E 5900.00 47.47 26.30 N 26 18 E 0.85 5112.23 2169.8 21.9 2013.24 N . 809.37 E 5925.00 47.48 26.39 N 26 23 E 0.27 5129.13 2188.2 21.9 2029.75 N 817 55 E 5950.00 47.21 26.37 N 26 22 E 1.08 5146.07 2206.5 22.0 2046.22 N . 825 72 E 5975.00 47.57 26.38 N 26 23 E 1.44 5162.99 2224.9 22.0 2062.71 N . 833 89 E 6000.00 47.35 26.37 N 26 22 E 0.88 5179.90 2243.3 22.0 2079.21 N . 842.07 E 6025.00 47.51 26.35 N 26 21 E 0.64 5196.81 2261.6 22.1 2095.71 N 850.25 E 6050.00 47.85 26.30 N 26 18 E 1.37 5213.64 2280.1 22.1 2112.28 N 858.44 E 6075.00 48.00 26.28 N 26 17 E 0.60 5230.39 2298.6 22.2 2128.91 N 866.66 E • 8 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4 -1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min, deg./ feet feet deg. feet 100 ft. 6100.00 48.28 26.29 N 26 17 E 1.12 5247.08 2317.1 22.2 2145.61 N 874.91 E 6125.00 48.55 26.36 N 26 22 E 1.10 5263.67 2335.8 22.2 2162.37 N 883.20 E 6150.00 48.42 26.58 N 26 35 E 0.84 5280.24 2354.5 22.3 2179.13 N 891.55 E 6175.00 48.56 26.53 N 26 32 E 0.58 5296.81 2373.1 22.3 2195.87 N 899.91 E 6200.00 48.51 26.67 N 26 40 E 0.46 5313.36 2391.8 22.3 2212.62 N 908.30 E 6225.00 48.61 26.94 N 26 56 E 0.90 5329.91 2410.5 22.4 2229.35 N 916.75 E 6250.00 48.58 26.72 N 26 43 E 0.67 5346.44 2429.2 22.4 2246.08 N 925.22 E 6275.00 48.45 26.15 N 26 9 E 1.79 5363.00 2447.9 22.4 2262.85 N 933.56 E 6300.00 48.24 25.12 N 25 7 E 3.19 5379.62 2466.5 22.4 2279.69 N 941.64 E 6325.00 47.99 23.76 N 23 46 E 4.17 5396.31 2485.1 22.5 2296.64 N 949.34 E 6350.00 47.70 22.61 N 22 37 E 3.60 5413.09 2503.6 22.5 2313.67 N 956.63 E 6375.00 47.69 21.37 N 21 22 E 3.67 5429.92 2522.1 22.5 2330.81 N 963.56 E 6400.00 47.38 20.19 N 20 11 E 3.70 5446.80 2540.6 22.4 2348.06 N 970.10 E 6425.00 46.90 19.24 N 19 14 E 3.38 5463.80 2558.9 22.4 2365.31 N 976.28 E 6450.00 46.85 18.21 N 18 13 E 3.01 5480.89 2577.1 22.4 2382.59 N 982.14 E 6475.00 47.05 17.21 N 17 13 E 3.03 5497.96 2595.3 22.4 2399.99 N 987.70 E 6500.00 47.02 16.37 N 16 22 E 2.46 5515.00 2613.5 22.3 2417.50 N 992.98 E 6525.00 46.48 15.66 N 15 40 E 2.99 5532.13 2631.6 22.3 2435.01 N 998.01 E 6550.00 46.06 15.46 N 15 28 E 1.78 5549.41 2649.5 22.2 2452.41 N 1002.85 E 6575.00 45.64 15.47 N 15 28 E 1.68 5566.82 2667.3 22.2 2469.70 N 1007.64 E 6600.00 45.03 15.28 N 15 17 E 2.50 5584.40 2685.0 22.2 2486.84 N 1012.35 E 6625.00 44.80 14.71 N 14 43 E 1.85 5602.10 2702.5 22.1 2503.89 N 1016.92 E 6650.00 44.35 14.00 N 14 0 E 2.69 5619.91 2719.9 22.1 2520.89 N 1021.27 E 6675.00 44.66 13.01 N 13 1 E 3.04 5637.74 2737.2 22.0 2537.93 N 1025.36 E 6700.00 44.83 11.95 N 11 57 E 3.06 5655.49 2754.6 21.9 2555.11 N 1029.16 E 6725.00 44.96 11.38 N 11 23 E 1.69 5673.20 2772.0 21.9 2572.39 N 1032.73 E 6750.00 45.57 11.01 N 11 1 E 2.66 5690.80 2789.4 21.8 2589.81 N 1036.18 E • 9 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4 -1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 6775.00 45.58 10.61 N 10 37 E 1.14 5708.30 2806.9 21.7 2607.35 N 1039.53 E 6800.00 45.45 10.62 N 10 37 E 0.52 5725.82 2824.4 21.7 2624.88 N 1042 81 E 6825.00 45.60 10.67 N 10 40 E 0.62 5743.33 2842.0 21.6 2642.41 N . 1046 11 E 6850.00 45.70 10.61 N 10 37 E 0.44 5760.81 2859.5 21.5 2659.98 N . 1049 41 E 6875.00 45.93 10.52 N 10 31 E 0.96 5778.23 2877.1 21.5 2677.61 N . 1052 69 E 6900.00 45.89 10.64 N 10 38 E 0.38 5795.63 2894.7 21.4 2695.26 N . 1055.99 E 6925.00 45.95 10.59 N 10 35 E 0.28 5813.02 2912.4 21.3 2712.91 N 1059 30 E 6950.00 45.88 10.53 N 10 32 E 0.33 5830.41 2930.0 21.3 2730.56 N . 1062 59 E 6975.00 45.95 10.37 N 10 22 E 0.54 5847.80 2947.7 21.2 2748.22 N . 1065 85 E 7000.00 45.88 10.45 N 10 27 E 0.36 5865.20 2965.3 21.1 2765.89 N . 1069 09 E 7025.00 46.01 10.33 N 10 20 E 0.62 5882.58 2983.0 21.1 2783.56 N . 1072.33 E 7050.00 45.71 10.31 N 10 19 E 1.20 5899.99 3000.6 21.0 2801.21 N 1075 55 E 7075.00 45.89 10.40 N 10 24 E 0.76 5917.42 3018.2 20.9 2818.84 N . 1078 77 E 7100.00 45.87 10.32 N 10 19 E 0.24 5934.83 3035.9 20.9 2836.49 N . 1082 00 E 7125.00 46.00 10.42 N 10 25 E 0.59 5952.21 3053.5 20.8 2854.16 N . 1085 23 E 7150.00 45.96 10.19 N 10 11 E 0.68 5969.58 3071.2 20.8 2871.85 N . 1088.44 E 7175.00 45.96 10.04 N 10 2 E 0.43 5986.96 3088.9 20.7 2889.54 N 1091 60 E 7200.00 45.76 10.10 N 10 6 E 0.82 6004.37 3106.5 20.6 2907.21 N . 1094 74 E 7225.00 45.80 10.16 N 10 10 E 0.23 6021.81 3124.1 20.6 2924.85 N . 1097 89 E 7250.00 45.97 9.84 N 9 50 E 1.14 6039.21 3141.8 20.5 2942.52 N . 1101 01 E 7275.00 45.75 9.81 N 9 49 E 0.88 6056.62 3159.4 20.5 2960.20 N . 1104.07 E 7300.00 45.94 9.92 N 9 55 E 0.82 6074.04 3177.0 20.4 2977.87 N 1107 14 E 7325.00 45.87 9.81 N 9 49 E 0.42 6091.43 3194.7 20.3 2995.56 N . 1110 22 E 7350.00 45.85 9.68 N 9 41 E 0.38 6108.84 3212.3 20.3 3013.24 N . 1113 25 E 7375.00 45.94 9.83 N 9 50 E 0.56 6126.24 3230.0 20.2 3030.93 N . 1116 30 E 7400.00 45.83 9.81 N 9 49 E 0.44 6143.65 3247.6 20.2 3048.62 N . 1119.36 E • • 10 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMiJTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft, 7425.00 45.84 9.61 N 9 37 E 0.58 6161.06 3265.3 20.1 3066.30 N 1122.38 E 7450.00 45.58 9.39 N 9 23 E 1.22 6178.52 3282.8 20.0 3083.95 N 1125.33 E 7475.00 45.79 9.51 N 9 31 E 0.91 6195.99 3300.4 20.0 3101.59 N 1128.27 E 7500.00 45.63 9.46 N 9 28 E 0.66 6213.44 3318.0 19.9 3119.24 N 1131.22 E 7525.00 45.72 9.52 N 9 31 E 0.40 6230.91 3335.6 19.9 3136.88 N 1134.17 E 7550.00 45.76 9.02 N 9 1 E 1.44 6248.36 3353.2 19.8 3154.55 N 1137.05 E 7575.00 45.72 9.04 N 9 2 E 0.17 6265.81 3370.8 19.8 3172.23 N 1139.86 E 7600.00 45.70 9.25 N 9 15 E 0.61 6283.27 3388.4 19.7 3189.90 N 1142.71 E 7625.00 45.62 8.79 N 8 47 E 1.35 6300.74 3406.0 19.7 3207.56 N 1145.51 E 7650.00 45.48 8.71 N 8 43 E 0.60 6318.25 3423.5 19.6 3225.20 N 1148.23 E 7675.00 45.64 8.86 N 8 52 E 0.77 6335.75 3441.0 19.5 3242.84 N 1150.95 E 7700.00 45.63 8.88 N 8 53 E 0.07 6353.23 3458.6 19.5 3260.50 N 1153.71 E 7725.00 45.53 8.64 N 8 38 E 0.79 6370.73 3476.1 19.4 3278.15 N 1156.43 E 7750.00 45.45 8.89 N 8 53 E 0.78 6388.25 3493.7 19.4 3295.77 N 1159.14 E 7775.00 45.17 8.93 N 8 56 E 1.13 6405.84 3511.1 19.3 3313.33 N 1161.90 E 7800.00 45.23 8.38 N 8 23 E 1.58 6423.45 3528.6 19.3 3330.86 N 1164.57 E 7825.00 45.22 8.83 N 8 50 E 1.28 6441.06 3546.0 19.2 3348.41 N 1167.22 E 7850.00 44.96 8.96 N 8 58 E 1.10 6458.71 3563.4 19.2 3365.90 N 1169.96 E 7875.00 44.94 8.72 N 8 43 E 0.68 6476.40 3580.8 19.1 3383.35 N 1172.67 E 7900.00 44.80 8.37 N 8 22 E 1.14 6494.12 3598.2 19.1 3400.80 N 1175.29 E 7925.00 44.78 8.10 N 8 6 E 0.77 6511.86 3615.5 19.0 3418.23 N 1177.82 E 7950.00 44.65 8.63 N 8 38 E 1.58 6529.63 3632.7 19.0 3435.63 N 1180.38 E 7975.00 44.46 8.61 N 8 37 E 0.76 6547.44 3650.0 18.9 3452.97 N 1183.00 E 8000.00 44.35 7.91 N 7 55 E 2.01 6565.30 3667.2 18.9 3470.28 N 1185.52 E 8025.00 44.46 7.97 N 7 58 E 0.47 6583.16 3684.4 18.8 3487.61 N 1187.93 E 8050.00 44.70 8.58 N 8 35 E 1.96 6600.97 3701.6 18.8 3504.97 N 1190.46 E 8075.00 44.43 7.71 N 7 43 E 2.67 6618.78 3718.9 18.7 3522.34 N 1192.95 E 11 • A Gyrodata Directional Survey BP Exploratio n (Alaska) Inc. Lease: J-Pad Well: J-24A, 4 -1/2" Tubing Location: Wel lhead, Pzudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 8100.00 44.36 7.31 N 7 19 E 1.15 6636.64 3736.0 18.7 3539.68 N 1195 23 E 8125.00 44.33. 8.10 N 8 6 E 2.21 6654.52 3753.2 18.6 3556.99 N . 1197 57 E 8150.00 44.27 7.83 N 7 50 E 0.79 6672.42 3770.3 18.6 3574.29 N . 1199.99 E 8175.00 44.37 7.07 N 7 4 E 2.16 6690.30 3787.5 18.5 3591.61 N 1202 26 E 8200.00 44.10 7.63 N 7 38 E 1.90 6708.21 3804.6 18.5 3608.90 N . 1204 49 E 8225.00 43.94 8.16 N 8 10 E 1.61 6726.19 3821.7 18.4 3626.11 N . 1206 88 E 8250.00 43.85 7.70 N 7 42 E 1.33 6744.21 3838.7 18.4 3643.28 N . 1209 27 E 8275.00 44.01 6.98 N 6 59 E 2.10 6762.21 3855.7 18.3 3660.48 N . 1211.48 E 8300.00 43.96 8.01 N 8 1 E 2.87 6780.20 3872.8 18.3 3677.69 N 1213 75 E 8325.00 43.92 7.67 N 7 40 E 0.96 6798.20 3889.9 18.2 3694.88 N . 1216 11 E 8350.00 43.43 6.92 N 6 55 E 2.85 681b.28 3906.8 18.2 3712.00 N . 1218 31 E 8375.00 44.03 6.97 N 6 58 E 2.40 6834.35 3923.8 18.1 3729.16 N . 1220 40 E 8400.00 43.68 8.09 N 8 5 E 3.40 6852.38 3940.8 18.1 3746.33 N . 1222.66 E 8425.00 43.55 7.42 N 7 25 E 1.92 6870.48 3957.8 18.0 3763.41 N 1224 99 E 8450.00 44.25 6.60 N 6 36 E 3.61 6888.49 3974.8 18.0 37$0.62 N . 1227 11 E 8475.00 44.17 7.37 N 7 22 E 2.17 6906.41 3991.9 17.9 3797.92 N . 1229 23 E 8500.00 44.03 7.82 N 7 49 E 1.37 6924.36 4009.0 17.9 3815.17 N . 1231 53 E 8525.00 44.03 7.10 N 7 6 E 2.00 6942.34 4026.1 17.8 3832.40 N . 1233.78 E 8550.00 43.92 6.93 N 6 56 E 0.65 6960.33. 4043.2 17.8 3849.63 N 1235 90 E 8575.00 43.98 7.99 N 7 59 E 2.95 6978.33 4060.2 17.8 3866.83 N . 1238 15 E 8600.00 43.83 7.73 N 7 44 E 0.94 6996.34 4077.3 17.7 3884.00 N . 1240 53 E 8625.00 43.56 6.79 N 6 47 E 2.81 7014.42 4094.3 17.7 3901.13 N . 1242 71 E 8650.00 43.99 7.43 N 7 26 E 2.47 7032.47 4111.3 17.6 3918.30 N . 1244.85 E 8675.00 43.81 7.93 N 7 56 E 1.56 7050.48 4128.4 17.6 3935.48 N 1247 17 E 8700.00 44.08 7.42 N 7 25 E 1.78 7068.48 4145.5 17.5 3952 67 N . 1249 48 E 8725.00 44.50 7.39 N 7 23 E 1.68 7086.38 4162.6 17.5 . 3969 98 N . 1251 73 E 8750.00 44.55 8.06 N 8 4 E 1.89 7104.20 4179.9 17.5 . 39$7.35 N . 1254.09 E 12 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4 -1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH BORE HO LE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min . deg./ feet feet deg. feet 100 ft. 8775.00 44.79 8.02 N 8 1 E 0.97 7121.98 4197.3 17.4 4004.75 N 1256.55 E 8800.00 44.66 7.60 N 7 36 E 1.29 7139.74 4214.6 17.4 4022.18 N 1258 94 E 8825.00 44.80 7.42 N 7 25 E 0.76 7157.50 4231.9 17.3 4039.63 N . 1261 24 E 8850.00 44.69 8.35 N 8 21 E 2.66 7175.26 4249.3 17.3 4057.06 N . 1263 65 E 8875.00 43.42 9.91 N 9 55 E 6.68 7193.23 4266.5 17.3 4074.22 N . 1266 41 E 8900.00 43.43 11.12 N 11 7 E 3.33 7211.38 4283.6 17.2 4091.12 N . 1269.54 E 8925.00 43.61 12.13 N 12 8 E 2.87 7229.51 4300.7 17.2 4107.98 N 1273 01 E 8950.00 42.72 13.95 N 13 57 E 6.12 7247.75 4317.8 17.2 4124.64 N . 1276 87 E 8975.00 42.52 15.53 N 15 32 E 4.35 7266.14 4334.7 17.2 4141.01 N . 1281 18 E 4000.00 42.49 17.30 N 17 18 E 4.79 7284.58 4351.6 17.2 4157.21 N . 1285 95 E 9025.00 42.53 18.82 N 18 49 E 4.11 7303.00 4368.4 17.2 4173.27 N . 1291.18 E 9050.00 42.62 19.97 N 19 58 E 3.13 7321.41 4385.4 17.2 4189.22 N 1296 80 E 9075.00 42.76 21.51 N 21 31 E 4.21 7339.79 4402.3 17.2 4205.08 N . 1302 80 E 9100.00 43.08 21.41 N 21 25 E 1.31 7358.10 4419.2 17.2 4220.92 N . 1309 03 E 9125.00 42.75 20.42 N 20 25 E 3.00 7376.41 4436.2 17.2 4236.82 N . 1315 11 E 9150.00 42.98 20.67 N 20 40 E 1.14 7394.73 4453.2 17.3 4252.75 N . 1321.08 E 9175.00 43.07 21.58 N 21 35 E 2.51 7413.01 4470.2 17.3 4268.66 N 1327 23 E 9200.00 42.98 20.35 N 20 21 E 3.38 7431.29 4487.3 17.3 4284.59 N . 1333 33 E 9225.00 43.18 20.58 N 20 35 E 1.02 7449.55 4504.3 17.3 4300.58 N . 1339 30 E 9250.00 43.15 21.42 N 21 25 E 2.30 7467.78 4521.4 17.3 4316.55 N . 1345 43 E 9275.00 43.42 20.99 N 20 59 E 1.60 7485.98 4538.5 17.3 4332.53 N . 1351.63 E 9300.00 43.60 20.43 N 20 26 E 1.70 7504.11 4555.7 17.3 4348.63 N 1357 71 E 9325.00 43.46 21.22 N 21 13 E 2.25 7522.24 4572.8 17.4 4364.72 N . 1363 84 E 9350.00 43.72 21.60 N 21 36 E 1.48 7540.34 4590.0 17.4 4380.77 N . 1370 13 E 9375.00 43.28 20.36 N 20 22 E 3.84 7558.48 4607.2 17.4 4396.84 N . 1376 29 E .9400.00 43.b5 20.52 N 20 31 E 1.54 7576.62 4624.4 17.4 4412.95 N . 1382.30 E 13 BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg, deg. min. deg./ feet feet deg. feet 100 ft. 9425.00 43.70 21.37 N 21 22 E 2.36 7594.70 4641.6 17.4 4429.07 N 1388.47 E 9450.00 43.96 21.07 N 21 4 E 1.33 7612.74 4658.9 17.4 4445.21 N 1394.73 E 9475.00 44.13 20.16 N 20 10 E 2.62 7630.71 4676.2 17.4 4461.48 N 1400.85 E 9500.00 44.07 21.33 N 21 20 E 3.27 7648.66 4693.6 17.4 4477.75 N 1407.01 E 9525.00 44.26 21.26 N 21 16 E 0.78 7666.60 4711.0 17.5 4493.98 N 1413.34 E .9550.00 44.08 20.21 N 20 13 E 3.01 7684.53 4728.4 17.5 4510.27 N 1419.51 E 9575.00 44.36 20.35 N 20 21 E 1.19 7702.45 4745.8 17.5 4526.63 N 1425.55 E 9600.00 44.32 20.53 N 20 32 E 0.53 7720.33 4763.2 17.5 4543.00 N 1431.65 E 9625.00 44.40 21.14 N 21 8 E 1.74 7738.20 4780.7 17.5 4559.33 N 1437.87 E 9650.00 44.75 21.07 N 21 4 E 1.41 7756.01 4798.2 17.5 4575.70 N 1444.19 E 9675.00 44.43 20.18 N 20 11 E 2.81 7773.81 4815.7 17.5 4592.13 N 1450.37 E 9700.00 44.72 20.79 N 20 47 E 2.07 7791.62 4833.2 17.5 4608.56 N 1456.51 E 9725.00 44.73 21.10 N 21 6 E 0.87 7809.38 4850.8 17.6 4624.99 N 1462.80 E 9750.00 45.00 21.78 N 21 47 E 2.20 7827.10 4868.4 17.6 4641.41 N 1469.25 E 9775.00 45.22 21.58 N 21 35 E 1.05 7844.75 4886.1 17.6 4657.87 N 1475.79 E 9800.00 45.40 20.64 N 20 38 E 2.77 7862.33 4903.8 17.6 4674.45 N 1482.19 E 9825.00 45.64 21.47 N 21 28 E 2.56 7879.84 4921.6 17.6 4691.09 N 1488.60 E 9850.00 45.97 21.91 N 21 55 E 1.83 7897.27 4939.5 17.6 4707.75 N 1495.22 E 9875.00 46.28 20.94 N 20 56 E 3.06 7914.60 4957.5 17.6 4724.53 N 1501.81 E 9900.00 46.49 22.04 N 22 2 E 3.29 7931.84 4975.5 17.6 4741.37 N 1508.44 E 9925.00 45.33 22.03 N 22 2 E 4.64 7949.24 4993.4 17.7 4758.01 N 1515.17 E 9950.00 45.35 23.24 N 23 14 E 3.44 7966.81 5011.2 17.7 4774.42 N 1522.02 E 9975.00 45.70 23.11 N 23 7 E 1.45 7984.33 5028.9 17.7 4790.82 N 1529.04 E 10000.00 45.23 22.16 N 22 10 E 3.30 8001.86 5046.7 17.7 4807.27 N 1535.90 E 10025.00 45.70 22.88 N 22 53 E 2.78 8019.39 5064.4 17.7 4823.73 N 1542.72 E 10050.00 44.70 23.38 N 23 23 E 4.24 8037.01 5082.1 17.8 4840.04 N 1549.69 E 10075.00 45.00 24.05 N 24 3 E 2.24 8054.73 5099.6 17.8 4856.19 N 1556.78 E • 14 BP Exploration (Alaska) Inc. Lease: J-Pad Well: J-24A, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 134 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. A Gyrodata Directional Survey BORE HOLE BEARING deg. min. DOGLEG SEVERITY deg./ 100 ft. VERTICAL CLOSURE HORIZONTAL DEPTH DIST. AZIMUTH COORDINATES feet feet deg. feet 10100.00 45.17 23.63 N 23 38 E 10125.00 45.26 22.63 N 22 38 E 10150.00 44.96 23.67 N 23 40 E 10175.00 45.58 23.87 N 23 52 E 10200.00 45.64 22.49 N 22 29 E 10225.00 44.31 22.94 N 22 56 E 10250.00 44.99 23.92 N 23 55 E 10275.00 45.00 22.78 N 22 47 E 10300.00 44.65 23.23 N 23 14 E 10325.00 44.84 23.55 N 23 33 E 10350.00 44.96 22.55 N 22 33 E .10375.00 44.22 22.83 N 22 50 E 10400.00 44.31 22.85 N 22 51 E 10425.00 44.52 22.90 N 22 54 E 10450.00 44.70 22.90 N 22 54 E 10475.00 44.17 23.34 N 23 20 E 10500.00 43.74 23.65 N 23 39 E Final Station Closure: Distance: 5397.83 ft Az: 18.07 deg. 1.37 8072.39 5117.2 17.8 4872.38 N 1563.94 E 2.86 8090.00 5134.9 17.8 4888.70 N 1570.91 E 3.18 8107.64 5152.5 17.8 4904.98 N 1577.87 E 2.54 8125.23 5170.2 17.9 4921.24 N 1585.03 E 3.95 8142.72 5188.0 17.9 4937.66 N 1592.06 E 5.47 8160.41 5205.6 17.9 4953.96 N 1598.88 E 3.87 8178.19 5223.1 17.9 4970.08 N 1605.87 E 3.22 8195.87 5240.7 17.9 4986.30 N 1612.87 E 1.89 8213.60 5258.2 17.9 5002.53 N 1619.76 E 1.18 8231.36 5275.7 18.0 5018.68 N 1626.75 E 2.86 8249.07 5293.3 18.0 5034.92 N 1633.66 E 3.06 8266.87 5310.8 18.0 5051.11 N 1640.43 E 0.36 8284.78 5328.2 18.0 5067.19 N 1647.20 E 0.85 8302.63 5345.6 18.0 5083.31 N 1654.00 E 0.72 8320.43 5363.1 18.0 5099.48 N 1660.83 E 2.45 8338.28 5380.6 18.1 5115.58 N 1667.70 E 1.92 8356.28 5397.8 18.1 5131.49 N 1674.62 E • 15 BP Exploration (Alaska) Inc. Well: J-Pad J-24A 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska 5000 4500 4000 3500 ~ 3000 z ~ 2500 O z 2000 1500 1000 500 0 Final - Gyrodata AK0608G_134 DEFINITIVE BO OM HOLE LO ATED • 0 200 400 600 800 1000 1200 1400 1600 FASTING (ft) BP Exploration (Alaska) Inc. Well: J-Pad J-24A 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska 24 22 20 18 0 16 a a~ X14 X12 w X10 L~ O D 8 6 4 2 0 Final - Gyrodata AK0608G_134 DEFINITIVE 'OM HO TED • • luuu wvu suuu 4vuu 5uuu euuv ~UUU ~i000 9000 10000 11000 12000 MEASURED DEPTH (ft) BP Exploration (Alaska) Inc. Well: J-Pad J-24A 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska 50 45 40 Final - Gyrodata AK0608G_134 DEFINITIVE OM HOLE TED 35 30 z 0 a 25 J U Z 20 15 10 5 0 • • u luvu ~uuu swu 4uuu 5uuu euuu 7000 8000 9000 10000 11000 12000 MEASURED DEPTH (ft) BP Exploration (Alaska) Inc. Wefl: J-Pad J-24A 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska 300 250 200 F- N d 150 100 50 0 Final Gyrodata AK0608G_134 DEFINITIVE BO OM HOL MD: 10500.00 0 10 00 20 00 30 00 40 00 50 00 60 00 70 00 80 00 90 00 100 00 110 00 120 00 i • MEASURED DEPTH (ft) Survey QC - RGS-C alysis Sheet /7~ SURVEY QUALITY CONTROL -DATA ANALYSIS RFFFRFN('F CVCTCMC Grid S stem Grid Correction 0.00 Azimuth reference: Grid /True North TRUE NORTH Vertical reference: RKB MSL/Other If other ive details TTF (1N IIATA De th 0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00 Northin s 0.00 Eastin s 0.00 Latitude 70.3277 Az. Ref: Grid True Grid Corrected Y N? Descri tion CALIBRATION Tool Number 6051 Calibration Date 29 Mar 2008 G TE FiFi A RAI 1 TFCT /l1nl....~I:A .... Five.l ..~-....F....,.,. un-_- __. ____:u_ :__..~ __.. ~__,. ~_. .. .. Cal value Pre ~ob offset ••--•• ••~~ ost •ob offset ~~•+••+•.- ••• ~~ •~•• Abs dif.cal. ost ~•--~~ rVw c.I VI IIICV Abs dif. re. ost al lcl IclUlll lV Ud~C Sec' Accel Scale 0.000000 0.000000 N A Cal Post - 0.00015 Mass Unbalance 0.00 0.00 N A Pre Post - 0.4° hr INITTAITSATTAN De th A rox 2475.15 No of stns 9 Sec' -Min No. - 6 Azimuth Mean 44.33 Std deviation 0.02 Sec' - Azi SD 0.2° Inclination Mean 14.83 Std deviation 0.00 Sec' -Inc SD 0.1° Earth Horizontal Rate Mean Abs meas-theor 0.01 Std deviation 0.01 Sec' -See 167 DRIFT TOOLFACE RATE Maximum toolface rate 43.98 Sec' - 400° sec IN/OLiT CAMPARTCAN /A7T' N/A TC TNN tico~ Inclination Difference Mean -0.09 Std dev' 0.12 Sec's -Casin 0.3°/Drill i e 0.3° Azimuth Difference Mean -0.06 Std dev' 0.19 Sec's -Casin 0.5° Dril{ i e 0.75° Lateral Diver ence 1000 1.34 Sec - 5.0 1000 Vertical Diver ence/1000 0.94 Sec' - 2.0/1000 t1FDTH PAN TR(ll Wireline Com an Schlumber er Line a 15 32 Encoder SF Schlumber er Max De th TD 10500 CCL Corrected Yes Zero De th Ri u RKB Rezero De th -8 Given u 'oint de th 10261.06 Measured P) 10265.06 Strech cor. At TD divided b TD 1000 .38 Sec' - 1.5 1000 Dif. Between ri u and rezero de the divided b TD 1000 Dif. Between iven and meas de th divided b meas 1000 .76 .38 Sec' - 2.0/1000 Sec' - 2.0 1000 SURV-Q365 (OPS SUR-MA-010) 22n° Tan 2004 /Revision 20 Page 1 of 1 AK0608G 134 Survey QC - RGS-CT cceptance Sheet ~~~~~`~ ~- FIELD AND SURVEY INFORMATION Operator BP EXPLORATION (ALASKA) INC. Field /Platform Well Number 7 -PAD 7 - 24A Survey section From 2400.00 ft. to 10511.00 ft. Date 9/ 10/ 2008 Gyrodata ]ob No AK0608G_134 Gyrodata Surveyors Steve Thompson Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurve with backu tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurve with backu tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investi ate and comment if effects are ne li ible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurve with backu tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either Inrun or outrun meet all other C arameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q366 (OPS SUR-MA-003) 13t° Nov 03 /Revision 12 Page 1 of 1 AK0608G 134 Survey QC - RGS-C ecification Sheet ~Y~ ~~~ SURVEY QUALITY CONTROL -SPECIFICATION DATA INITTALTSATTAN Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs (ERMeas-ERTneo) 26 14.83 47.28 0.0087 27 14.83 47.26 0.0081 28 14.83 47.29 0.0197 29 14.83 47.31 0.0151 30 14.83 47.29 0.0111 31 14.83 47.31 0.0220 32 14,83 47.25 0.0005 33 14.83 47.31 0.0013 34 14.83 47.30 0.0015 Average 14.83 47.29 0.0098 Tolerance on Average* 0.0849 Standard Deviation 0.00 0.02 0.0075 Tolerance on St. Dev.** 0.1° 0.2° 0.0416 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1/Cosh * J[(COSA*Sini*0.1)Z+D~] u/hr ** Tolerence on Standard Deviation of earth horizontal rate difference tolerance is given by (1/CosI) *J[(CosA*Sini*0.1)Z+(0.08Z/(n-1))] ~/hr DRTFT TIINFC Drift Tune Number Ending Time Ending Depth Ending Inclination Ending Azimuth Residual Gx Bias Residual Gy Bias Start End Start End 1 1563.99 5000.22 43.90 23.27 0.000 -0.003 0.001 -0.001 2 1563.83 7500.50 45.84 9.53 -0.001 0.004 -0.006 0.007 3 1852.26 10510.84 43.74 23.66 0.000 0.003 -0.006 0.008 4 2429.13 7500.76 45.81 9.55 0.008 0.000 0.011 -0.009 5 1533.47 5000.65 44.04 23.46 0.001 -0.002 0.012 -0.010 6 1685.20 2400.45 12.83 54.97 0.001 0.002 0.001 0.003 Average 0.002 0.001 0.002 -0.000 Standard Deviation 0.003 0.002 0.007 0.007 Tolerance for both the Average and the Standard Deviation 0.033°/hr 0.033°/hr 0.033°/hr 0.033°/hr _INATION AND AZIMUTH INRUN AND OUTRUN COMPARI' Depth Corrected Inclination Inrun * Outrun * Difference 100.00 0.13 0.05 0.07 200.00 0.12 0.11 0.01 300.00 0.11 0.17 -0.06 400.00 0.11 0.23 -0.12 500.00 0.12 0.23 -0.11 600.00 0.16 0.22 -0.06 Corrected Azimuth Inrun * Outrun * Difference 69.68 66.76 2.92 115.76 132.82 -17.06 131.29 106.40 24.89 115.30 80.34 34.96 139.46 100.86 38.59 139.52 121.32 18.21 SURV-Q167 (OPS SUR-MA-003) 19"' Nov 03 /Rev 15 Page 1 of 9 AK0608G 134 Survey QC - RGS-C ecification Sheet ~a#a ~~~ 700.00 0.22 0.13 0.08 136.76 132.51 4.25 800.00 0.14 0.05 0.10 108.45 143.53 -35.08 900.00 0.16 0.04 0.12 145.55 133.18 12.37 1000.00 0.16 0.03 0.13 89.00 122.52 -33.51 1100.00 0.11 0.07 0.04' 331.29 70.28 -98.99 1200.00 0.10 0.11 -0.01 308.42 17.80 -69.38 1300.00 0.12 0.15 -0.04 264.58 293.78 -29.21 1400.00 0.15 0.19 -0.05' 255.63 210.63. 45.00 1500.00 0.17 0.16 0.01 253.82 241.44 12.38 1600.00 0.16 0.13 0.03 233.95 272.69 -38.74 1700.00 0.37 1.10 -0.73 93.51 0.47 93.04 1800.00 2.12 2.07 0.05 88.99 $7.55 1.44 1900.00 2.76 3.20 -0.45 90.48 82.82 7.66 2000.00 4.24 4.35 -0.11 80.05 78.12 1.93 2100.00 6.68 6.45 0.23 76.13 76.83 -0.70 2200.00 8.54 8.55 -0.01.. 75.50 75.47 0.03 2300.00 10.30 10.68 -0.37 69.27 65.19 4.08 2400.00 12.95 12.80 0.15 56.13 54.88 1.25 2475.00 15.38 15.39 -0.00 46.09 45.88 0.21 2500.00 16.27 16.25 0.02 43.96 44.56 -0.61 2525.00 17.02 17.02 0.01 ' 42.06 42.63 -0.57 2550.00 17.89 17.73 0.16 40.29 40.38 -0.09 2575.00 18.50 18.62 -0.12 37.59 38.24 -0.65 2600.00 19.13 18.97 0.16 35.38 35.77 -0.39 2625.00 19.44 19.35 0.09 33.06 33.39 -0.32 2650.00 19.72 19.77 -0.05 29.50 29.81 -0.31 2675.00 20.11 19.87 0.24 27.54 28.18 -0.64 2700.00 20.48 20.49 -0.01 24.78 24.80 -0.03 2725.00 20.96 20.89 0.07.. 24.31 24.66 -0.34 2750.00 21.10 20.99 0.11 23.80 24.59 -0.79 2775.00 21.68 21.65 0.03 23.35 23.23 0.12 2800.00 22.88 22.81 0.07 19.34 19.63 -0.29 2825.00 23.51 23.35 0.16 '! 16.98 17.74 -0.76 2850.00 24.04 24.02 0.02 15.72 15.78 -0.06 2875.00 25.39 25.37 0.02 14.52 14.73 -0.22 2900.00 26.70 26.40 0.30 13.52 13.78 -0.26 2925.00 27.55 27.61 -0.06 13.04 13.41 -0.38 2950.00 28.55 28.40 0.14 13.11 13.32 -0.21 2975.00 29.59 29.49 0.11 12.76 12.86 -0.10 3000.00 29.90 29.77 0.12 12.48 13.03 -0.55 3025.00 30.21 30.33 -0.12 12.74 12.87 -0.13 3050.00 30.51 30.63 -0.12 12.75 12.79 -0.05 3075.00 30.90 30.71 0.19 12.84 12.78 0.06 3100.00 31.19 31.20 -0.01 12.84 12.98 -0.14 3125.00 31.56 31.33 0.23 12.70 12.71 -0.01 SURV-Q367 (OPS SUR-MA-003) 19~" N ov 03 /Rev 15 Page 2 of 9 AKO6O8G_134 Survey QC - RGS- ecification Sheet ~1Yj'~1~~~ 3150.00 31.76 31.74 0.03 12.48 13.03 -0.54 3175.00 32.06 32.07 -0.01 12.50 12.94 -0.44 3200.00 32.39 32.38 0.01 12.48 12.81 -0.33 3225.00 32.88 32.89 -0.01 12.50 12.67 -0.17 3250.00 34.15 34.24 -0.09 12.37 12.42 -0.05 3275.00 34.97 35.05 -0.09 12.43 12.40 0.03 3300.00 36.61 36.63 -0.02 12.70 13.01 -0.31 3325.00 37.31 37.37 -0.06 12.71 12.79 -0.08 3350.00 37.98 38.03 -0.05 12.86 13.25 -0.39 3375.00 38.43 38.43 0.00 12.89 12.97 -0.08 3400.00 38.93 39.03 -0.10 13.02 13.35 -0.33 3425.00 39.75 39.82 -0.06 13.35 13.35 -0.00 3450.00 40.53 40.70 -0.17 13.51 13.78 -0.27 3475.00 41.00 41.04 -0.04 13.51 13.54 -0.03 3500.00 41.45 41.53 -0.08 13.54 13.88 -0.33 3525.00 41.46 41.57 -0.11 13.72 13.87 -0.15 3550.00 41.36 41.40 -0.04 13.99 14.37 -0.38 3575.00 41.67 41.66 0.01 14.02 14.11 -0.09 3600.00 41.65 41.75 -0.10 14.31 14.61 -0.30 3625.00 41.69 41.57 0.12 14.49 14.83 -0.34 3650.00 41.64 41.72 -0.09 14.78 14.84 -0.06 3675.00 41.48 41.58 -0.10 15.09 15.40 -0.31 3700.00 41.50 41.40 0.10 15.16 15.28 -0.12 3725.00 41.42 41.53 -0.10 15.50 15.85 -0.34 3750.00 41.54 41.62 -0.08 15.60 15.70 -0.09 3775.00 41.53 41.68 -0.14 15.69 15.97 -0.28 3800.00 41.55 41.53 0.03 15.59 15.91 -0.32 3825.00 41.40 41.47 -0.07 15.41 15.42 -0.01 3850.00 41.78 41.96 -0.18 15.38 15.56 -0.19 3875.00 41.94 42.00 -0.06 15.34 15.62 -0.28 3900.00 42.08 42.10 -0.02 15.24 15.20 0.03 3925.00 41.94 42.12 -0.18 15.31 15.51 -0.19 3950.00 41.87 42.05 -0.19 15.72 15.81 -0.08 3975.00 41.10 41.22 -0.12 17.02 17.32 -0.30 4000.00 40.90 40.85 0.06 17.83 17.95 -0.12 4025.00 40.70 40.84 -0.14 18.56 18.56 -0.01 4050.00 40.62 40.78 -0.16 .18.64 18.89 -0.25 4075.00 40.80 40.77 0.04 18.60 18.89 -0.29 4100.00 40.88 40.95 -0.07 18.49 18.51 -0.03 4125.00 41.24 41.41 -0.16 18.38 18.58 -0.20 4150.00 41.32 41.42 -0.10 18.30 18.63 -0.33 4175.00 41.40 41.30 0.09 18.31 18.49 -0.18 4200.00 41.42 41.53 -0.11 18.38 18.42 -0.04 4225.00 41.31 41.49 -0.18 18.60 18.85 -0.26 4250.00 41.35 41.38 -0.03 18.84 19.19 -0.35 SURV-Q367 (OPS SUR-MA-003) 19tl' Nov 0 3 /Rev 1S Page 3 of 9 AKO6O8G 134 Survey QC - RGS-C ecification Sheet ~~,~"~~~ ~~ 4275.00 41.27 41.31 -0.04 19.23 19.27 -0.03 4300.00 41.25 41.42 -0.17 19.42 19.57 -0.15 4325.00 41.50 41.64 -0.14 19.42 19.69 -0.27 4350.00 41.33 41.30 0.03 19.32 19.43 -0.11 4375.00 41.49 41.62 -0.14 19.40 19.27 0.12 4400.00 41.36 41.55 -0.19 19.36 19.47 -0.11 4425.00 41.13 41.09 0.04 19.24 19.29 -0.05 4450.00 41.49 41.51 -0.02 19.28 19.43 -0.15 4475.00 41.52 41.60 -0.08 19.22 19.37 -0.15 4500.00 41.79 41.92 -0.13 19.24 19.37 -0.13 4525.00 41.75 41.94 -0.19 19.21 19.23 -0.02 4550.00 41.88 42.08 -0.20 19.24 19.27 -0.04 4575.00 42.27 42.43 -0.16 19.51 19.45 0.06 4600.00 42.12 42.29 -0.16 20.06 20.00 0.06 4625.00 42.00 42.00 0.00 20.67 20.80 -0.13 4650.00 42.00 41.84 0.16 20.84 20.90 -0.06 4675.00 42.15 42.28 -0.13 20.96 21.16 -0.20 4700.00 42.04 42.18 -0.13 21.21 21.53 -0.31 4725.00 41.94 41.99 -0.05 21.72 21.76 -0.04 4750.00 42.24 42.47 -0.23 22.01 22.18 -0.16 4775.00 42.20 42.25 -0.05 22.50 22.85 -0.35 4800.00 41.95 42.19 -0.24 23.06 23.16 -0.10 4825.00 41.99 42.15 -0.16 23.35 23.66 -0.31 4850.00 41.89 42.01 -0.12 23.39 23.41 -0.02 4875.00 42.45 42.64 -0.19 23.38 23.69 -0.31 4900.00 42.76 42.82 -0.07 23.36 23.47 -0.11 4925.00 43.33 43.47 -0.14 23.40 23.77 -0.37 4950.00 43.41 43.61 -0.19 23.35 23.56 -0.21 4975.00 43.79 43.77 0.01 23.30 23.68 -0.38 5000.00 43.89 44.09 -0.20 23.28 23.46 -0.18 5025.00 43.95 43.91 0.04 23.26 23.58 -0.31 5050.00 44.23 44.43 -0.20 23.38 23.61 -0.23 5075.00 44.46 44.42 0.04 23.51 23.61 -0.10 5100.00 44.63 44.80 -0.17 23.72 24.01 -0.29 5125.00 44.61 44.65 -0.03 23.86 23.95 -0.08 5150.00 44.75 44.91 -0.16 23.91 24.22 -0.31 5175.00 44.99 45.08 -0.09 24.10 24.18 -0.08 5200.00 45.11 45.19 -0.08 24.27 24.60 -0.33 5225.00 45.02 45.19 -0.17 24.30 24.46 -0.15 5250.00 44.98 44.94 0.04 24.22 24.51 -0.29 5275.00 44.68 44.87 -0.19 24.05 24.32 -0.27 5300.00 44.49 44.54 -0.05 24.13 24.18 -0.05 5325.00 44.42 44.35 0.07 24.07 24.28 -0.21 5350.00 44.70 44.82 -0.13 24.04 24.36 -0.32 5375.00 44.59 44.74 -0.15 23.98 24.14 -0.16 SURV-Q367 (OPS SUR-MA-003) 19th Nov 03 /Rev 15 Page 4 of 9 AK0608G 134 Survey QC - RGS- ecification Sheet ~/'~ 5400.00 44.73 44.76 -0.03 24.11 24.15 -0.05 5425.00 45.22 45.24 -0.02 24.16 24.50 -0.34 5450.00 45.13 45.37 -0.24 24.32 24.51 -0.19 5475.00 45.38 45.64 -0.26 24.37 24.50 -0.13 5500.00 45.40 45.66 -0.25 24.46 24.58 -0.12 5525.00 45.31 45.56 -0.25 24.42 24.45 -0.03 5550.00 45.50 45.49 0.01 24.40 24.57 -0.16 5575.00 45.55 45.78 -0.23 24.36 24.58 -0.22 5600.00 45.54 45.79 -0.25 24.43 24.55 -0.12 5625.00 45.96 46.21 -0.25 24.55 24.67 -0.12 5650.00 46.00 46.21 -0.21 24.87 24.95 -0.08 5675.00 46.24 46.37 -0.13 25.15 25.16 -0.01 5700.00 46.39 46.49 -0.10 25.43 25.44 -0.01 5725.00 46.27 46.35 -0.09 25.49 25.55 -0.06 5750.00 46.44 46.52 -0.08 25.44 25.49 -0.04 5775.00 46.48 46.62 -0.14 25.58 25.85 -0.27 5800.00 46.80 46.98 -0.17 25.59 25.85 -0.25 5825.00 46.79 47.00 -0.21 25.54 25.77 -0.23 5850.00 46.91 47.15 -0.25 25.78 25.97 -0.20 5875.00 47.19 47.47 -0.28 25.99 26.18 -0.19 5900.00 47.33 47.60 -0.27 26.25 26.39 -0.14 5925.00 47.35 47.64 -0.29 26.35 26.46 -0.12 5950.00 47.04 47.34 -0.30 26.36 26.40 -0.04 5975.00 47.46 47.74 -0.27 26.37 26.43 -0.06 6000.00 47.18 47.48 -0.30 26.35 26.41 -0.06 6025.00 47.36 47.65 -0.29 26.34 26.39 -0.05 6050.00 47.71 47.99 -0.28 26.32 26.30 0.02 6075.00 47.86 48.14 -0.28 26.30 26.27 0.03 6100.00 48.16 48.39 -0.23 26.35 26.26 0.09 6125.00 48.48 48.64 -0.16 26.43 26.31 0.12 6150.00 48.35 48.50 -0.15 26.68 26.53 0.15 6175.00 48.54 48.59 -0.06 26.65 26.45 0.21 6200.00 48.48 48.54 -0.05 26.63 26.73 -0.10 6225.00 48.63 48.59 0.04 26.90 27.02 -0.12 6250.00 48.60 48.57 0.03 26.59 26.89 -0.30 6275.00 48.41 48.49 -0.07 26.04 26.30 -0.26 6300.00 48.16 48.32 -0.16 25.04 25.21 -0.17 6325.00 47.89 48.09 -0.20 23.68 23.85 -0.17 6350.00 47.57 47.82 -0.25 22.52 22.71 -0.18 6375.00 47.58 47.83 -0.25 21.30 21.46 -0.16 6400.00 47.24 47.51 -0.27 20.10 20.28 -0.18 6425.00 46.81 47.02 -0.21 19.16 19.33 -0.18 6450.00 46.71 46.98 -0.28 18.13 18.30 -0.18 6475.00 46,89 47.20 -0.31 17.15 17.27 -0.12 6500.00 46.91 47.12 -0.21 16.39 16.36 0.02 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev iS Page 5 of 9 AK0608G_134 t Survey QC - RGS-CT cification Sheet 6525.00 46.41 46.55 -0.14 15.55 15.78 -0.23 6550.00 45.92 46.19 -0.27 15.39 15.56 -0.17 6575.00 45.49 45.78 -0.29 15.51 15.47 0.04 6600.00 44.94 45.08 -0.14 15.36 15.24 0.12 6625.00 44.71 44.89 -0.18 14.63 14.80 -0.16 6650.00 44.18 44.48 -0.30 13.99 14.04 -0.05 6675.00 44.60 44.74 -0.14 13.05 12.99 0.06 6700.00 44.72 44.94 -0.22 11.85 12.07 -0.22 6725.00 44.81 45.10 -0.30 11.36 11.42 -0.06 6750.00 45.52 45.64 -0.12 11.05 11.02 0.03 6775.00 45.45 45.70 -0.24 10.52 10.73 -0.20 6800.00 45.36 45.54 -0.18 10.65 10.63 0.01 6825.00 45.50 45.69 -0.19 10.57 10.82 -0.25 6850.00 45.57 45.82 -0.25 10.63 10.62 0.01 6875.00 45.86 46.02 -0.16 10.40 10.67 -0.27 6900.00 45.73 46.03 -0.30 10.63 10.69 -0.06 6925.00 45.97 45.97 0.01 10.54 10.70 -0.16 6950.00 45.76 45.97 -0.21 10.43 10.67 -0.23 6975.00 45.84 46.07 -0.23 10.25 10.51 -0.26 7000.00 45.76 46.00 -0.24 10.37 10.59 -0.22 7025.00 45.90 46.14 -0.24 10.23 10.47 -0.24 7050,00 45.57 45.85 -0.28 10.28 10.37 -0.09 7075.00 45.75 46.03 -0.28 10.43 10.42 0.01 7100.00 45.72 46.01 -0.29 10.38 10.30 0.08 7125.00 45.92 46.09 -0.17 10.52 10.37 0.15 7150.00 45.90 46.01 -0.11 10.29 10.13 0.17 7175.00 45.95 46.00 -0.04 10.02 10.09 -0.07 7200.00 45:63 45.87 -0.23 10.15 10.10 0.05 7225.00 45.76 45.85 -0.09 10.28 10.09 0.19 7250.00 45.92 46.03 -0.12 9.82 9.89 -0.07 7275.00 45.63 45.83 -0.20 9.85 9.82 0.03 7300.00 45.95 45.93 0.02 10.02 9.86 0.17 7325.00 45.84 45.90 -0.06 9.81 9.85 -0.04 7350.00 45.79 45.91 -0.12 9.66 9.74 -0.07 7375.00 45.87 46.01 -0.14 9.82 9.88 -0.06 7400.00 45.72 45.92 -0.21 9.84 9.83 0.00 7425.00 45.83 45.86 -0.03 9.72 9.54 0.18 7450.00 45.54 45.61 -0.08 9.36 9.44 -0.07 7475.00 45.76 45.85 -0.09 9.64 9.43 0.21 7500.00 45.59 45.66 -0.06 9.44 9.52 -0.08 7525.00 45.66 45.78 -0.12 9.64 9.45 0.19 7550.00 45.71 45.82 -0.12 8.97 9.09 -0.11 7575.00 45.65 45.79 -0.14 9.01 9.11 -0.10 7600.00 45.65 45.74 -0.09 9.26 9.30 -0.04 7625.00 45.53 45.70 -0.18 8.78 8.82 -0.03 SURV-Q367 (OPS SUR-MA-003) 19"' Nav 03 /Rev 1S Page 6 of 9 AK060SG_134 Survey QC - RGS-C ecification Sheet j`+i~~a 7650.00 45.36 45.59 -0.23 8.73 8.73 0.00 7675.00 45.52 45.77 -0.25 8.90 8.86 0.04 7700.00 45.53 45.71 -0.18 9.00 8.82 0.17 7725.00 45.55 45.51 0.04 8.61 8.70 -0.09 7750.00 45.34 45.55 -0.21 8.91 8.92 -0.01 7775.00 45.03 45.27 -0.24 9.04 8.88 0.16 7800.00 45.12 45.34 -0.21 8.43 8.32 0.11 7825.00 45.19 45.25 -0.06 8.90 8.83 0.07 7850.00 44.87 45.03 -0.16 8.95 9.02 -0.07 7875.00 44.82 45.07 -0.25 8.77 8.73 0.05 7900.00 44.76 44.82 -0.06 8.50 8.27 0.23 7925.00 44.74 44.83 -0.09 8.08 8.14 -0.06 7950.00 44.54 44.74 -0.19 8.66 8.64 0.02 7975.00 44.36 44.56 -0.20 8.71 8.58 0.12 8000.00 44.22 44.46 -0.25 7.96 7.89 0.06 8025.00 44.33 44.59 -0.25 8.01 7.94 0.07 8050.00 44.65 44.75 -0.10 8.74 8.51 0.23 8075.00 44.38 44.46 -0.08 7.72 7.72 -0.00 8100.00 44.28 44.43 -0.15 7.27 7.36 -0.09 8125.00 44.27 44.40 -0.13 8.11 8.17 -0.06 8150.00 44.16 44.37 -0.21 7.91 7.80 0.10 8175.00 44.29 44.46 -0.17 7.17 6.97 0.20 8200.00 44.00 44.20 -0.20 7.71 7.57 0.14 8225.00 43.83 44.03 -0.21 8.27 8.11 0.16 8250.00 43.79 43.90 -0.11 7.87 7.56 0.32 8275.00 44.01 44.02 -0.01 7.09 6.87 0.22 8300.00 43.90 44.00 -0.10 8.01 8.06 -0.05 8325.00 43.86 43.99 -0.13 7.72 7.67 0.04 835x.00 43.34 43.49 -0.15 6.93 6.91 0.02 8375.00 43.98 44.11 -0.13 6.98 6.98 -0.01 8400.00 43.54 43.80 -0.26 8.10 8.15 -0.05 8425.00 43.48 43.58 -0.10 7.52 7.41 0.10 8450.00 44.30 44.21 0.09 6.61 6.59 0.01 8475.00 44.15 44.22 -0.07 7.34 7.43 -0.09 8500.00 43.98 44.08 -0.10 7.86 7.86 0.01 8525.00 44.04 44.02 0.02 7.21 7.01 0.20 8550.00 43.89 43.95 -0.07 6.91 6.96 -0.05 8575.00 43.93 44.01 -0.08 8.13 7.88 0.25 8600.00 43.83 43.86 -0.03 7.76 7.79 -0.03 8625.00 43.50 43.57 -0.06 6.91 6.68 0.23 8650.00 43.97 44.06 -0.09 7.43 7.46 -0.03 8675.00 43.78 43.80 -0.01 8.09 7.86 0.23 8700.00 44.00 44.15 -0.15 7.44 7.41 0.04 8725.00 44.54 44.48 0.07 7.44 7.38 0.06 8750.00 44.47 44.63 -0.16 8.18 8.00 0.18 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev IS Page 7 of 9 AK06g8G_134 Survey QC - RGS-C ecification Sheet 8775.00 44.76 44.82 -0.06 8.05 8.06 -0.01 8800.00 44.70 44.62 0.08 7.70 7.54 0.16 8825.00 44.74 44.83 -0.09 7.52 7.30 0.21 8850.00 44.69 44.74 -0.05 8.37 8.36 0.01 8875.00 43.43 43.37 0.07 10.04 9.84 0.21 8900.00 43.32 43.51 -0.18 11.26 11.05 0.21 8925.00 43.59 43.67 -0.08 12.14 12.17 -0.02 8950.00 42.76 42.69 0.06 14.00 13.95 0.05 8975.00 42.47 42.54 -0.07 15.67 15.39 0.28 9000.00 42.39 42.60 -0.21 17.39 17.29 0.10 9025.00 42.45 42.61 -0.16 18.82 18.80 0.02 9050.00 42.63 42.65 -0.02 20.02 20.02 0.00 9075.00 42.64 42.89 -0.25 21.61 21.47 0.14 9100.00 43.04 43.12 -0.08 21.59 21.29 0.30 9125.00 42.62 42.85 -0.23 20.48 20.35 0.13 9150.00 42.95 43.05 -0.10 20.65 20.68 -0.03 9175.00 43.10 43.05 0.05 21.75 21.55 0.20 9200.00 42.92 43.02 -0.10 20.49 20.18 0.30 9225.00 43.10 43.28 -0.17 20.59 20.54 0.05 9250.00 43.11 43.18 -0.06 21.43 21.47 -0.05 9275.00 43.46 43.41 0.06 21.04 20.98 0.07 9300.00 43.60 43.57 0.02 20.53 20.30 0.23 9325.00 43.40 43.52 -0.12 21.35 21.08 0.27 9350.00 .43.61 43.82 -0.21 21.72 21.58 0.13 9375.00 43.21 43.34 -0.13 20.36 20.33 0.04 9400.00 43.64 43.70 -0.06 20.50 20.54 -0.03 9425.00 43.72 43.68 0.05 21.46 21.37 0.10 9450.00 43.99 43.96 0.02 21.23 21.01 0.22 9475.00 44.09 44.12 -0.03 20.28 19.97 0.30 9500.00 43.99 44.14 -0.15 21.49 21.22 0.27 9525.00 44.16 44.38 -0.22 21.38 21.21 0.17 9550.00 44.00 44.16 -0.17 20.24 20.15 0.09 9575.00 44.31 44.42 -0.11 20.39 20.33 0.06 9600.00 44.30 44.38 -0.08 20.54 20.52 0.03 9625.00 44.40 44.40 0.01 21.19 21.14 0.05 9650.00 44.79 44.74 0.05 21.18 21.07 0.11 9675.00 44.45 44.38 0.07 20.29 20.06 0.23 9700.00 44.74 44.70 0.04 20.94 20.69 0.25 9725.00 44.73 44.71 0.02 21.26 21.00 0.27 9750.00 44.94 45.04 -0.11 21.91 21.67 0.24 9775.00 45.14 45.31 -0.17 21.70 21.48 0.22 9800.00 45.32 45.48 -0.16 20.67 20.55 0.12 9825.00 45.59 45.72 -0.13 21.52 21.44 0.08 9850.00 45.94 46.03 -0.08 21,98 21.94 0.03 9875.00 46.26 46.32 -0.06 20.93 20.90 0.03 SURV-Q167 (OPS SU R-MA-003) 19~h Nov 03 /Rev 35 Page 8 of 9 AK0608G 134 Survey QC - RGS-C ecification Sheet .-~ 9900.00 46.54 46.50 0.04 22.11 22.00 0.11 9925.00 45.36 45.27 0.10 22.10 21.98 0.11 9950.00 45.37 45.30 0.07 23.39 23.16 0.24 9975.00 45.74 45.70 0.03 23.27 23.00 0.27 10000.00 45.17 45.18 -0.01 22.29 22.01 0.28 10025.00 45.65 45.79 -0.14 23.02 22.76 0.26 10050.00 44.59 44.80 -0.21 23.47 23.29 0.18 10075.00 44.91 45.09 -0.18 24.12 24.01 0.11 10100.00 45.12 45.27 -0.15 23.65 23.63 0.03 10125.00 45.20 45.30 -0.10 22.61 22.60 0.00 10150.00 44.93 45.00 -0.07 23.67 23.71 -0.04 10175.00 45.58 45.52 0.06 23.92 23.90 0.02 10200.00 45.71 45.63 0.08 22.51 22.46 0.05 10225.00 44.29 44.24 0.05 23.06 22.83 0.23 10250.00 45.01 44.9$ 0.03 24.11 23.94 0.17 10275.00 45.00 44.97 0.03 22.94 22.61 0.33 10300.00 44.59 44.74 -0.15 23.27 23.17 0.10 10325.00 44.79 44.91 -0.12 23.60 23.59 0.00 10350.00 44.95 45.01 -0.05 22.52 22.54 -0.02 10375.00 44.21 44.21 0.00 22.82 22.88 -0.06 10400.00 44.32 44.28 0.04 22.83 22.91 -0.07 10425.00 44.56 44.52 0.04 22.90 22.93 -0.03 10450.00 44.70 44.72 -0.02 22.89 22.94 -0.06 10475.00 44.16 44.19 -0.03 23.36 23.36 -0.00 10506.00 43.68 43.68 0.00 23.64 23.64 0.00 Average -0.0933 -0.0605 Standard Deviation 0.1236 0.1937 Tolerance for both the Average and the Standard Deviation Casing 0.3° Drill i e 0.3° Casing 0.5° Drill i e 0.75° .........uuvn a~w r+unwu~ m~c~FrVlC~cu w manic ucpu~5 as snown. SURV-Q167 (OPS SUR-MA-003) 19n' Nov 03 /Rev 15 Page 9 of 9 AK0608G_334 Schlumberger Alaska Data & Consulting Services 2525 Gambel! Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job# Log Description Date BL H-01A \ q ~- - \ \ ~J 10687663 LDL 01/04/04 1 J-24 A :h~Ÿ ...,t\Lo( 10563218 SBHP SURVEY 09/28/03 1 E-05A \CjQ-030 10703984 SBHP SURVEY 04/10/04 1 A-13 j g J - i S- tl 10621770 PPROF W/DEFT/GHOST 03/22/04 1 C-17 A i q ~- G)..J 10672332 LDL 10/27/03 1 F-46A ).. (:/-( - C, ~ I~,( 10715389 MCNL 03/18/08 1 2-68/5-17 I g ;j .. ~ 9 '1 10866550 PPROF WIDEFT 07/07/04 1 1-45/0-26 / Be¡.... i J.. 'f 10568473 PPROF WIDEFT/GHOST 07/11/03 1 B-17 J 7 c¡- C<J.- t~ 10679034 PSP INJECTION PROFILE 11/27/03 1 5-30 I c¡ t. -. C ~ G· 10560328 SBHP SURVEY 01/02/04 1 5-42 \ 1;.1L~Ó fj '-f 10877777 SBHP SURVEY 08/22/04 1 BP Exploration (Alaska) Inc. Petrotechnícal Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 SC!\NNED SEP ['",.,,' 0 2 nL n ~ ". lì -d 'JJ 1 ) ( .:^:Á..~... ¡¡tv) LÀl~ ,~' Date Delivered: 07/20/05 NO. 3438 JßO~;¡'~lþ Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color CD 13 ~'IJ --' Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 995031838 í' J I A TTN: Beth /1. J I.,'. r~f ~' . fl ¡ ! f I " II ¡l".J_ Ar.",vÅ, > {.A II. ._ í Received by: \/1 I/Y IV v ... 'V\e' ." , . ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: o Abandon o Alter Casing D Change Approved Program .,~~J $'1~ D Suspend D Operation Shutdown D Perforate D Other J' ,ll 181 Repair Well D Plug Perforations D Stimulate D Re-Ent~r~~~8;1rde~Well 181 Pull Tubing D Perforate New Pool D Waiver D Time Ë'xtenslon'" ZOO~j 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: 181 Development D Exploratory o Stratigraphic D Service 5. Permit To Drill Number: 200-214 6. API Number: 50-029-21686-01-00 99519-6612 79.2' 9. Well Name and Number: PBU J-24A 8. Property Designation: ADL 028281 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 13728 feet true vertical 8694 feet Plugs (measured) None Effective depth: measured 13728 feet Junk (measured) None true vertical 8694 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 110' 110' Surface 2664' 13-3/8" 2701' 2682' 4930 2670 Intermediate 10805' 9-5/8" 10843' 8609' 6870 4760 Production Liner 306' 7" 10557' - 10863' 8397' - 8624' 7240 5410 Liner 3155' 3-3/16" x 2-7/8" 10573' - 13728' 8409' - 8694' SCß~NNED ,n.1l p I'") 2001~ , ò.. ,.1 Perforation Depth MD (ft): 13061' - 13726' Perforation Depth TVD (ft): 8694' - 8694' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 4-1/2", 12.6# 13Cr80 / L-80 10611' 9-5/8" TIW 'HBBP' packer; 9-5/8" Baker 'S-3' packer; 4-1/2" HES 'X' Nipple 10516' & 10362'; 2117' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: RBDMS 6F1. ji /1,' ~ Ci 70m: .' ,'\..1, /, .Î . . lI.1 13. Oil-Bbl Representative Daily Average Production or Injection Data Gas-Met Water-Bbl CasinQ Pressure TubinQ Pressure Prior to well operation: Subsequent to operation: 14. Attachments: 0 Copies of Logs and Surveys run 181 Daily Report of Well Operations 181 Well Schematic Diagram 15. Well Class after proposed work: o Exploratory 181 Development D Service 16. Well Status after proposed work: BOil D Gas 0 WAG D GINJ D WINJ D WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact David Reem, 564-5743 N/A Printed Name Terrie Hubble Signature ~rvu"l . ~. Form 10-404 Revised 04/2004 Title Technical Assistant !) HI I ~. i f\1 ^ I Dro I. I I Prepared By Name/Number: Date t';)..f3,t{:; Terrie Hubble, 564-4628 Submit Original Only Phone 564-4628 · . ) ) Well: Field: API: Permit: J-24A Rig Workover Prudhoe Bay Unit 50-029-21686-01-00 200-214 Accept: Spud: Release: Rig: 06/09/05 N/A 06/14/05 Doyon 16 PRE-RIG WORK 05/19/05 PULL PRONG FROM TTP AT 10538' SLM. ZOO~:I OS/20/05 PULL PXX PLUG FROM 10548' MD DRIFT TO 10554' SLM. OS/29/05 SET 41/2" HES FAS DRILL BP WITH MID ELEMENT AT 10563'. WELL LEFT SHUT IN. 05/30/05 CHEM CUT TUBING AT 10460' (MIDDLE OF FIRST FULL JOINT ABOVE PACKER). TUBING PUNCH 10410'- 10412' AND STRING SHOT 10450' - 10462'. WELL LEFT SHUT IN. (' F'i 1 r' ~t r\ i ^ , ( J -< I ¡ '"1 ' I, \" /-\ : ,-" , \. .!. v............'. t ~¡J ¡' t .......... · r ) ) BP EXPLORATION '" f Operations Sum maryReport JUN:1' ~.\ 2005·Page 1 of 4 l,,' . _::~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: J-24 J-24A WORKOVER DOYON DRILLING INC. DOYON 16 Start: 6/8/2005 Rig Release: 6/14/2005 Rig Number: Spud Date: 1/21/1987 End: 6/14/2005 Date From - To Hours Task Code NPT Phase Description of Operations 6/812005 21 :00 - 23:30 2.50 MOB P PRE Back Off From J-18. Install Booster. Move Rig From J-18 to J-24a. 23:30 - 00:00 0.50 MOB N WAIT PRE Wait on DSM to Remove Flow Line Section From J-24a. 6/9/2005 00:00 - 00:30 0.50 MOB N WAIT PRE Wait on DSM to Remove Flow Line. 00:30 - 01 :30 1.00 MOB P PRE Layout Herculite and Matting Boards 01 :30 - 03:30 2.00 MOB P PRE Position Rig over Well, Level and Shim. Accept Rig at 0300 hrs. 03:30 - 04:00 0.50 RIGU P DECOMP Take on Seawater, Rig Up to Circulate. 04:00 - 05:00 1.00 WHSUR P DECOMP R I U BPV Lubricator and Pull BPV. 0 psi on Tbg and IA. 05:00 - 07:00 2.00 KILL N WAIT DECOMP Wait on Vac Truck Load of Seawater. Wait on Nabors 2-ES Rig Move to allow Vac trucks to proceed. 07:00 - 10:30 3.50 KILL P DECOMP Circulate Diesel from wellbore wi 820 Bbls 120 F seawater. Monitor well, well dead. 10:30 - 12:00 1.50 WHSUR P DECOMP P/U TWC and install and test to 1000 psi. 12:00 - 13:00 1.00 WHSUR P DECOMP N/D Tree and Adaptor Spool wi Power-Tork wrench. 13:00 - 15:00 2.00 BOPSUP P DECOMP N/U BOPE and prepare for BOPE test. Chuck Sheve wi AOGCC waived the witnessing of the BOPE tests. 15:00 - 18:30 3.50 BOPSUPP DECOMP Pressure Test BOPE per AOGCC and BP requirements: 250 psi Low and 3500 psi High, and record. Tests witnessed by M. Rooney and M. Alvano, Rig Supervisors. 18:30 - 19:30 1.00 PULL P DECOMP RID BOPE Test Equipment. M I U Tbg Hanger XO to 4" DP, R I U Control Line Spooling Unit and Pipe Handling Equip. 19:30 - 20:00 0.50 WHSUR P DECOMP PJSM on Pulling Tubing. R I U DSM Lubricator and Pull TWC, R 10 DSM Lubricator. 20:00 - 20:30 0.50 PULL P DECOMP Engage Tbg Hanger and BOLDS. Pull Hanger to Floor wi 182,000# . 20:30 - 22:00 1.50 PULL P DECOMP Circulate Bottoms Up At 8 BPM, 310 psi. 22:00 - 00:00 2.00 PULL P DECaMP B I 0 and LID Tubing Hanger, XO and Joint of 4" DP. POOH and LID 4-1/2" L-80 Tubing and Control Line. 6/10/2005 00:00 - 00:30 0.50 PULL P DECOMP Continue POOH wi 4-1/2" L-80 Tubing and Control Line. 00:30 - 01 :00 0.50 PULL P DECOMP LID SSSV and RID Spooler. Retrieved all Control Line, 26 Clamps, and 4 SS Bands. 01 :00 - 02:00 1.00 PULL P DECOMP POOH wi 4-1/2" L-80 Tbg. 02:00 - 02:30 0.50 PULL P DECOMP Service Top Drive and Pipe Skate. 02:30 - 09:00 6.50 PULL P DECOMP POOH wi 4-1/2" L-80 Tbg. Recovered 257 joints of Tubing including the 17.62' Cut-off joint. Two joints, #161 and #175, had corrosion holes in the joint body. Many of the pin ends showed severe corrosion-related metal losses. 09:00 - 10:00 1.00 PULL P DECOMP RID Tubing handling equipment, clear and clean Rig Floor, R/U to change 9-5/8" Packoff wi Cameron YBY Pulling Tool.. 10:00 - 15:30 5.50 WHSUR P DECOMP P/U Pulling Tool and pull Packoff from Mandrel. Packoff pulled hard, but all of it came. Tried several times to install new packoff element and could not get past the top of the 9-5/8" Mandrel. It appears that the 9-5/8" casing may have lengthened from the hot water circulation. Confer wi Engineering and decide to RIH wi RTTS and NID BOP Stack to get at 9-5/8" Mandrel. 15:30 - 00:00 8.50 CLEAN P DECOMP M/U BHA #1: Dress-off Shoe wi extensions, 9-5/8" Casing Scraper, Bumper Sub, Oil Jar, and 9, 4-3/4/0 DC and RIH wi DP from Pipe Shed to -8,000'. 6/11/2005 00:00 - 01 :00 1.00 DHB P DECaMP PJSM, PI U RTTS Storm Packer and M I U to 4" DP. RIH wi Ip 3 Joints DP. 01 :00 - 01 :30 0.50 DHB DECOMP Set Sorm Packer at -90'. POOH with 3 Joints DP and Stand r r¡'(:'i?\\ '\L Printed: 6/20/2005 11: 1 0:36 AM \J t\ ¡ ~lì ~ \ }-\ ) ) BP EXPLORATION Operations Summary Report .JU~"'~ 2!i~. 21]05 Back in Derrick. Test to 1000 psi. PJSM, Drain Stack, BID and B I 0 lines on BOP Stack. Remove Riser. N I D Tubing Spool I BOP from Casing Spool. Inspect and Dress Off 9-5/8" Pack Off Area. Install New 9-5/8" Pack Off. N I U Tubing Spool I BOP to Casing Spool and Test 9-5/8" Pack Off to 5000 psi for 30 minutes. R I U Lines and Hoses. Install Riser and Return Lines. Body Test BOPE, 250 psi Low 13500 psi High. Continue RIH wI Cleanout BHA. Maintenance on Top Drive. Ease down onto Stub with jt #318 and tag @ 10,453'. P/U and establish parameters: P/U wt 190K, S/O wt 145k, 5 BPM, 770 psi, Rot Wt 165K @ 50 RPM. Stop rotating, slowly lower to tag up again @ 10,453'. P/U and start rotating, swallow stub 10', at 5,000 Ibs WOB, increase rotation to 100 RPM and allow Dress-off Mill to drill off. Stop drilling, P/U and lower back down to watch for pressure increase when BHA Dress-off Mill and Extensions swallow Stub. Good indication. DECOMP Reverse Circulate wI Safe-Surf-W and Hi Vis Sweep. -4-5 Bbls of Crude Oil came with first returns, then cleaned up to seawater. Circulated Safe Surf 'W' Sweep around wi 720 Bbls of seawater. B I 0 and BID Top Drive. POOH with 4" DP and Stand Back in Derrick. B I 0 and LID BHA #1. M I U BHA #2. 5 Bladded 3.7" Mill ( Inside 8-1/2" Shoe), Bit Sub wi Shear Pin Assenbly, 4 - Jts 2-7/8" PAC DP, Bumper Sub, Oil Jars, 9- Jts 4-3/4" DC. RIH wI BHA #2 on 4" DP from Derrick. Continue RIH wI BHA #2 on 4" DP from Derrick to Top of Tubing Stub at 10453'. Establish Parameters; PI U Weight 195,000#, S I 0 Weight 140,000#. Rot Weight = 166,000 # at 60 RPMs, 7,000 ft-Ibs Torque. Circulate at 40 stk I min at 510 psi. Wash Down and Shear Guide at 10453'. DECOMP Wash and Ream to Top of Fas Drill Plug. Tag Plug at 10555'. DECOMP Mill Fas Drill Plug at 10555'. Circulate at 40 stk I min at 610 psi, 2,000-4,000 # WOB, 45-55 RPMs, 9,000 ft-Ibs Torque. Mill through at 10557', Immediately Lost Returns. Continue to Wash and Ream to TOL at 10563'. PI U and Repeat 3 Times to Confirm Clear. Lost -100 bbls During Milling Operations. Increase Circulation Rate to 60 stk I min. Able to Establish Circulation. Back Rate Down to 40 stk I min and Circulate Bottoms Up. Loss Rate = 3/4 bpm at 4 bpm Circ Rate. POOH and LID 4" DP. Break out and UD BHA #2. Clear Rig Floor, Pull Wear Ring, and R I U 4-1/2" Tubing Handling Equipment and Torque Tum. PJSM on running Tubing. RIH wi 4-1/2" 13Cr80 Tubing, Baker Loc all Joints Below Packer, Torque all Connections to 4440 ft-Ibs. P I U and Run Unique Over Shot, Joint #1 , and Lower X-Nipple. WAIT RUNCMP Collar on Lower X-Nipple Assy Damaged When Latching Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: J-24 J-24A WORKOVER DOYON DRILLING INC. DOYON 16 Date From - To Hours Task Code NPT Phase 6/11/2005 01 :00 - 01 :30 0.50 DHB P DECaMP 01 :30 - 02:00 0.50 WHSUR P DECOMP 02:00 - 03:00 1.00 WHSUR P DECOMP 03:00 - 05:30 2.50 WHSUR P DECOMP 05:30 - 07:00 1.50 WHSUR P DECOMP 07:00 - 11 :00 4.00 CLEAN P DECOMP 11 :00 - 11 :30 0.50 CLEAN P DECOMP 11 :30 - 12:45 1.25 CLEAN P DECOMP 12:45 - 16:00 3.25 CLEAN P 16:00 - 20:30 4.50 CLEAN P DECOMP 20:30 - 22:00 1.50 CLEAN P DECOMP 22:00 - 00:00 2.00 CLEAN P DECaMP 6/12/2005 00:00 - 02:00 2.00 CLEAN P DECOMP 02:00 - 02:30 0.50 CLEAN P DECOMP 02:30 - 03:00 03:00 - 04:00 0.50 CLEAN P 1.00 CLEAN P 04:00 - 05:30 1.50 CLEAN P DECOMP 05:30 - 15:00 9.50 CLEAN P DECOMP 15:00 - 17:00 2.00 CLEAN P DECOMP 17:00 - 18:30 1.50 RUNCOrvP RUNCMP 18:30 - 19:30 1.00 RUNCOrvP RUNCMP 19:30 - 22:30 3.00 RUNCOI'vf\J I I Start: 6/8/2005 Rig Release: 6/14/2005 Rig Number: Spud Date: 1/21/1987 End: 6/14/2005 Description of Operations ORIGINAL Printed: 6/20/2005 11: 1 0:36 AM ) ) BPEXPLORATION Operations Summary Report \~ . "r'.; Page 3 of 4 ,,',,"i,j JU;\] ~. " ~<:,~ 2005 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: J-24 J-24A WORKOVER DOYON DRILLING INC. DOYON 16 Start: 6/8/2005 Rig Release: 6/14/2005 Rig Number: SP49'Dé!te: 1/21/1987 End: 6/14/2005 Date From- To Hours Task Code NPT Phase Description of Operations 6/12/2005 19:30 - 22:30 3.00 RUNCOrv1\l 00:30 - 01 :30 1.00 RUNCOrvP WAIT RUNCMP Elevators. Collar is Baker Loc'd to Tubing Body. Sent Joint to Baker Machine to be Bucked Off and New Collar Bucked On and Re-Baker Loc'd. RUNCMP X-Nipple On Location, Continue to RIH wi 4-1/2" 13Cr80 Completion. RUNCMP RIH wi 4-1/2" 13Cr80 Tubing Completion. RUNCMP M/U jts #244, #245. Get parameters: P/U wt 150K, S/O wt 120K, 2.5 BPM, 120 psi. Slowly lower and see pressure increase @ 7' in on #245, continue on until losing 12K @ 12' in. P/U above stub, stop pump and slowly lower, but let weight fall off 20K. See no shear pin break. P/U above stub, make one revolution wi tubing and start pump @ 2.5 BPM, 120 psi, slowly lower, see pressure increase @ 7.5' in on #245. Start taking weight 10' in and shear pins break w/12k @ 12' in on #245. Continue to swallow until stacking out @ 15' in. P/U above stub and SID pump, then lower to verify--stack out @ 9' in. P/U and repeat wi pump on @ 2.5 BPM and can get to 15' in on #245. Confer wi engineering and decide to rig up to reverse circulate wi a 20 Bbl HiVis pill ahead of the first 160 Bbls of hot seawater. Calculate Spaceout; need three pups, 10.08', 10.09', and 4.05' to achieve 5' of swallow after packer has been set. POOH wi joint #245, #244, and #243. M/U Spaceouts and #243 and R/U to Reverse Circulate. Reverse Circulate @ 3 BPM: 20 Bbls HiVis Sweep, 160 Bbls 120 F seawater, and 580 Bbls 120 F seawater mixed wi 2 Bbls EC 1124A Correxit Corrosion Inhibitor. RIH and tag up to determine fill depth around tubing stub. Tag up with 6,000 # 27' in Joint #244 ( 10458'). Make 1 full rotation and tag again, same depth. Make another rotation and tag, same depth. Need 29' for current space out. R I U circulating head on Jt #244. Circulate down at 2.5 bpm at 110 psi. Pressure increase seen at 25' (10456') in on Jt #244, Stacked out 34' ( 10465' ) in on Jt #244. Shut down pumps and PI U. Wait 10 mins, RIH and Check Depth of Fill, 28.5' ( 10459.5' ) in on Jt #244. PI U and wait 10 mins. Check depth again, 28' ( 10459'). Fill behind tubing stub, not able to circulate out. Decide to change out 4.05' Pup for 2.36' Pup, will still have -3' swallow over tubing stub and allow for l' for packer stroke. RUNCMP B I 0 and U D Jt #244, #243 and 4.05' Pup. PI U 2.36' Pup, #243, and #244. RUNCMP RIH wi Joint #243 and #244. Tagged up 30' (10,459') in on #244. With Current Space Out, Bottom of Over Shot at 10,458.5', Top of Tubing Stub at 10,456'. RID Jt #244, PI U Tubing Hanger. RUNCMP RIH, Landed Tubing Hanger and RILDS. R I U to Pressure Test and Set Packer. RUNCMP Pressure Tested Tubing to 3,500 psi f/30 mins - Good Test. Bled Down Tubing to 2,000 psi. Pressure Tested IA to 3,500 psi f/30 mins - Good Test. Bled Down Tubing to 1,300 psi and Sheared DCR Valve. Pumped Down Tubing and Confirmed Circulation up lA, Pumped Down IA and Confirmed Circulation up Tubing. 22:30 - 00:00 1.50 RUNCOrv1\l 6/13/2005 00:00 - 12:00 12:00 - 14:30 12.00 RUNCOrvP 2.50 RUNCOI\tP 14:30 - 15:30 1.00 RUNCOMP RUNCMP 15:30 - 20:30 5.00 RUNCOMP RUNCMP 20:30 - 23:00 2.50 RUNCOMP RUNCMP 23:00 - 00:00 1.00 RUNCOrvP 6/14/2005 00:00 - 00:30 0.50 RUNCOrvP 01 :30 - 03:00 1,50 RUNCOrvP l':; F, ~ i~,~ t ¿ \ L Printed: 6/20/2005 11: 1 0:36 AM ) ) BP EXPLORATION ;: >, .ft ! ti ..~ ~"',,' I ,,"'" 1'1 Operations Summary Report' I 'r'ij ,) II ,~\, I¡:~: {'i 2005 j,,;. , Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 6/14/2005 J-24 J-24A WORKOVER DOYON DRILLING INC. DOYON 16 From- To Hours Task Code NPT Phase 03:00 - 04:00 1.00 BOPSUR P RUNCMP 04:00 - 06:00 2.00 BOPSUR P RUNCMP 06:00 - 08:00 2.00 WHSUR P RUNCMP 08:00 - 09:00 1.00 WHSUR P RUNCMP 09:00 - 12:00 3.00 WHSUR P RUNCMP 12:00 - 13:00 1.00 WHSUR P RUNCMP 13:00 - 15:00 2.00 WHSUR P RUNCMP Page 4 of 4 . r'~,: ~ 'I, :. ~w;~ ,'.:~:., ~,::,;, ~"::,: \~i" t7':',' "t'~ '?', I;~; ~ :';,~¡: :/'i SpqQ Date: 1/21/1987 End: 6/14/2005 Start: 6/8/2005 Rig Release: 6/14/2005 Rig Number: Description of Operations RID Pressure Test Equipment and Hoses. Set TWC, Tested from Below to 1,000 psi. RID and B / Lines, N / D BOPE. N I U McEvoy 13-5/8" x 7-1/16" Adaptor Flange and 13-5/8" x 6-3/8" Tree. Tested Neck Seal and Void to 5,000 psi. Tested Tree to 5,000 psi. PJSM, R / U to Reverse Circulate Diesel Freeze Protect. Reverse Circulated 150 bbls Diesel Freeze Protect. U- Tubed Freeze Protect f/ 1 hour. Set BPV and Tested to 1,000 psi. R / D Hot Oil. M / U Gauges to Tree, N / D Secondary Annulas Valve, Secured Well, Cleaned and Cleared Cellar Area. Released Rig At 1500 Hrs, 6/14/2005. Printed: 6/20/2005 11: 1 0:36 AM \ '-' ", ,.." ~ '. "'1\ ~ ;', ~..........., TRæ=· ~ WELLHEAD= ACTUA TOR= KB. ELEV = BF. B.EV = KOP= , Max, Angle = Datum MD = Datum TVD= CrN6" McEVOY AXELSON 79.2' 41.2' 1700' 101 @ 11096' 11203' 8800' ~-24A Completion) ~ ~ 113-3/8" CSG, 72#, L-80 BTRS, ID = 12.347" 1-1 2701' ~ Minimum ID = 2.25" @ 13,060' TOP OF 2-7/8" SLOTTED LINER L 14112' lEQ 126#, 1~, 0.0152 qi, D= 3.g)B' I :8: ~ I . I I TOP OF 7" LlNERI-I 10557' r--I . .. ...- 141/2" TBG, 12.6#, L-80, BTC, 0.0152 bpf, ID = 3.958" 1-1 10611' 1 r l 19-5/8" CSG, 47#, L-80,BTRS, ID=8.681 1-1 10843' I 10860' 1-1 TOP WHIPSTOCK CTD HORIZONTAL SIDETRACK, SLOTTED LINER COMPLETION PBTD 1-1 11657' ~ 17" LNR, 26#, L-80, 0.0383 bpf, ID = 6.276"1-1 11700' l"":i ~ DATE REV BY 02108/87 02/18/01 01/11/01 03/20/01 11/01/01 10/29/03 ~ 12117'1-1 HE~~NI~Ë,ID 2~!S:{3" Ii, ~" GAS, LIFT MANDRELS STA MD"TVD DEV TYÆ VL V LATCH PORT 4 3227 3147 34 MMG OCR RKP 3 6190 5305 48 MMG DMY RK 2 8396 6849 44 MMG DMY RK 1 10271 8192 45 MMG DMY RK DATE 10341' 1-14-1/2" HES X NIPPLE ID = 3.813" 1 10361' 1-19-5/8" BAKER S-3 PKR 1 10385' 1-14-1/2" HES X NIPPLE ID = 3.813" 1 10448' 1-1 UNIQUE MACHINE OVERSHOT 10496' - TOP OF PBR I 10516' -'9~'5j8;' PKR(TrN HBBP) ID = 4.750" 1 10548' 1-14-1/2" OTIS X NIPPLE ID = 3.813" 1 i 10573' 1 10579' I I I 1 I-ITrN DEPLOYMENT SUB,ID = 3.00" 1- 3-3/16" LNR, ENTRY GUIDE 3.19#, L-80, TC-11, ID = 2.79" 1-14-1/2" OTIS XN NIPPLE, ID = MILLED TO 3.80" 1-14-1/2" TUBING TAIL 1 1-1 TT ELMD - LOGGED 10579' 10611' 10608' 10635' 1-1 ESTIMA TED TOC 1 MILL OUT WINDOW 10863' - 10865' 1 10,898' 1- 2-7/8" SOLID LNR, 6.16#, L-80 STL, MIN ID = 2.37" 13060' 1-1 EST. BTM OF CMT 1 '~" "~" "~" "~I IPBTDI-i 13726' I~ 1 ~-I 13728' I 13060' 1-12-7/8" SLOTTED LNR. 6.16#, L-80, STL, MlN ID = 2.25" DATE REV BY COMMENTS 04/04104 GLB/KAK GL V C/O 05129/05 WJHlPJC CHEM CUTI FASDRlLL RUG COMMENTS ORIGINAL COM PLETION Whitlow CTD HORlZ SDTRK, LINERS SIS-MD INITIAL REDRAW CHITP CORRECTIONS WB/TP SURF LOC CORRECTION ffiH CEMENT CORRECTION PRUDHOE BAY UNIT WB.L: J-24A PERMIT No: 200-2140 API No: 50-029-21686-01 SEC9, T11N, R13E t""\ '( : : 4"i \.~,": BP Exploration (Alaska) F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc MICROFilMED 04/01/05 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE Permit to Drill 2002140 DATA SUBMITTAL COMPLIANCE REPORT 41112003 Well Name/No. PRUDHOE BAY UNIT J-24A Operator BP EXPLORATION (ALASKA) INC APl No. 50-029-21686-01-00 MD 13728./- TVD . 8694 /'~ Completion Dat 2/712001 /' Completion Statu 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Sample N_go Directional Survey ~ j~J~- , DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type ~t O ED D ~~erification Rpt ~er LIS Verification ED .~LIS Verification Rpt ~/e~r/~ Verification Rpt Vet' LIS Verification ED D~~~'~S Verification Rpt ~er LIS Verification ED C ~ See Notes ED C -..-.=..--~'See Notes Log Log Run Name Scale Media No Intewal Start Stop ~(~""~' ' FINAL CNL/GPJCCL 215 FINAL Directional Survey FINAL Directional Survey FINAL Directional Survey f/~ {/ FINAL Directional Survey . FINAL Directional Survey/i~i ,~..~ FINAL Directional Survey FINAL 10622 10622 10622 10859 10859 10851 10851 10851 10851 1O851 10850 10850 13024 13024 13024 (data taken from Logs Portion of Master Well Data Maint) OH I Dataset CH Received Number Comments Case 3/1612001 ~3'03 10622-13024 ch ch 3/16/2001 ~J4~3~3 10622-13024 Digital Data 3/16/2001 10622-13024 BL, Sepia ch 3/1/2001 Directional Survey Digital Data ch 3/1/2001 Directional Survey Paper Copy ch 3/1/2001 Directional Survey Digital Data ch 311/2001 Directional Survey Paper Copy ch 3/1/2001 Directional Survey Digital Data ch 3/1/2001 13704 Open 9/10/2002 13704 Open 9110/2002 11872 Open 9/10/2002 11872 Open 9/10/2002 11872 Open 9/10/2002 12951 Open 9/10/2002 12951 Open 9110/2002 13728 ,.q.a~..~1/31/2003 11900 eas'e"~.~1/3112003 Directional Survey Paper Copy 11028(,// 11029/,,J~ PB1 PB1 11030{,~2 PB2 11573 vOigital Well Log9in9 Data~ 11574 ~Dl~al Well Logging Data PB1 DATA SUBMITTAL COMPLIANCE REPORT 41112003 Permit to Drill 2002140 Well Name/No. PRUDHOE BAY UNIT J-24A Operator BP EXPLORATION (ALASKA) INC APl No. 50-029-21686-01-00 MD 13728 TVD 8694 ! ED C ~-- ~ Notes Well Cores/Samples Information: Completion Dat 2/7/2001 Completion Statu 1-OIL I 10850 12975 Current Status 1-OIL UIC N ,C, aee--~131/2003 11575 Digital Well Logging Data~.,D ~ltt~trc,,, PB2 ' Name ADDITIONAL INFORMATION Well Cored? y N~ Chips Receivec[~,~'~'/'~~'- Analysis ~ Receive. d? Start Interval Stop Sent Received Daily History Received? Formation Tops Dataset Number Comments '~)/N Comments: Compliance Reviewed By: Date: To: WELL LOG TRANSMITTAL State of' Alaska Alaska Oil and Gas Conservation Comm. Atm.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska .99501 MWD Formation Evaluation Logs J-24A & J-24A PB I+PB2 January 30, 2003 AK-MW-10027 J-24A+PBl+PB2: Digital Log Images: 50-029-21686-01, 70, 71 1 CD Rom i~.~.XS~ ^c~owi.~_x~. ~c~.n,i ~¥ '~;m~,~d ~ ~Tmse~a T~ COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Explo~on (Alaska) Inc. Petro-technical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: RECEIVED dAN 3 1 200,~ Alaska Oit & Gas ~a. ~ WEI,I, LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7~ Avenue, Suite 100 Anchorage, Alaska RE: MWD Formation Evaluation Logs J-24A, AK-MW- 10027 September 03, 2002 1 LDWG formatted Disc with verification listing. APl#: 50-029-21686-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: RECEIVED SEP ! 0 2.002 Alaska Oil & Gas Cons. C, mmi~ Anoh.omge WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Lisa Weepie 333 West 7~ Avenue, Suite 100 Anchorage, Alaska September 04, 2002 RE: MWD Formation Evaluation Logs J-24A PB 1, AK-MW- 10027 1 LDWG formatted Disc with verification listing. API#: 50-029-21686-70 i i PLEASE ACKNOWLEDGE RECEH~T BY SIGNING. AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO ,TIIE ATTENIION OF: Sperry-Sun Drilling Services Arm: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska. 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: RECEIVED $£P 10 £00 WELL LOG TRANSMYVrAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7~ Avenue, Suite 100 Anchorage, Alaska September 04, 2002 RE: MWD Formation Evaluation Logs J-24A PB2, AK-MW-10027 1 LDWG formatted Disc with verification listing. APl#: 50-029-21686-71 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION O1': Sperry-Sun Drilling Services Attn: Jan Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 RECEIVED SEP 10 2002 Alaska 0;'t & Gas Cons. Commission Mchorage Schlumkerger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-6711 ATTN: Sherrle NO. 1040 Company: Field: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 315101 Color Well Job # Log Description Date Blueline Sepia Prints CD J-24A,._~~.~/~ 21073 MCNL (PDC) 02/03101 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: RECEIVED t4AR 1 6 2001 Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATrN: Sherrie Receiv~ ALASJ ,.~IL AND GAS CONSERVATION WELL COMPLETION OR RECOMPLETION REPORT AND LOG RECEIVED MAR 1 4 ZOO1 1. Status of Well Classification of Service )~l~orage [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 200-214 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21686-01 4. Location of well at surface ... 9. Unit or Lease Name ~;..:,; ·. ....... ~ 583' SNL, 803' WEL, SEC. 09, T11N, R13E, UM ,;: ':~. '::";;0;..' ~C,,ATiOI~.! ti Prudhoe Bay Unit At top of productive interval ' """ ~:. · ¥~tlr-jl~ !, At total depth :" ~.~ : 10. Well Number 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease D'~ign~iti0h"afid Serial No. 11. Field and Pool Prudhoe aay Field / Prudhoe aay Pool KBE = 79.20' ADL 028281 17. Total Depth {MD+TYD) 118. Plug aack Depth (MD+'BtD) 119. Directional Suntey 1 20. Depth where SSS.V set1 21. Thickness of Permafrost 13728 8694 FTI 13728 8694 FTI [] Yes [] NoI (Nipple) .. 20~!.MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, ROP, MemoryCNL, CCL, RES 23. ' . CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TO~ BOTTOM S~ZE CEMENTING RECORD AMOUNT PUl! FO 20" Conductor ' Suflace 110' 9 cu yds concrete ' ' 13-3/8" 72# L-80 / S-95 37' 2701' 17-1/2" 3755 cuft Permafrost 'C' 9-5/8" 47# L-80 38' 10843' 12-1/4" 575 cu ft Class 'G' 7" 26# IJ4S 10557' 10863' 8-1/2" 384 cu ft Class 'G' 3-3/16. x2.7/s. 6.2# / 6.16# L-80 10573' 13728' 3-3/4" 135 cu ft Class 'G' 24. Perforations pp. en tq Productipn (M.D+.TVD of Top and 25. TUBING RECORD Bottom and mmrva~, size eno numoer~ SIZE DEPTH SET (MD) PACKER SET (MD) 2-7/8" Slotted Liner 4-1/2", 12.6#, L-80 10611' 10511' MD TVD MD TVD 13061' - 13726' 8694' - 8694' 26. AcD, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL IUD) AMOUNT & KIND OF MATERIAL USED 2000' Freeze Protect with 25 Bbls of MeOH 27. PRODUCTION TEST r'~ ~ I/,~ ! ~ ! Date First Production Method of Operation (Flowing, gas lift, etc.) U ~ ~ ~' j i~ ~ L February 18, 2001 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-aBE GAS-MCF WATER-aBE CHOKE SIZE I GAS-OIL RATIO 2/19/2001 4 TEST PERIOD 1610 10579 57 95'18 . I 6571 Flow Tubing Casing Pressure CALCULATED 'OIL-BBL GA~S-MCF WATEr-aBE OIL GRAwTY-API (CORR)' ' ' Press. 24-HOUR RATE 23.5 28. CORE DATA Bdef description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered Depth Depth and gravity, GOR, and time of each phase. Shublik (Base Sag River) 10916' 8661' Inverted: Shublik (Base Sag River) 11256' 8662' 31. List of Attachments: Summary of Daily Drilling Reports, Surveys (Submitted by Vendor) 32. I hereby certify that the foreg..oing is true and correct to the best of my knowledge Signed TerrieHubble~'~[~.(~~_ Title TechnicalAssistant Date J-24A 200-214 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. /Approval No, INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5-' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 BP EXPLORATION Page 1 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Date From-To Hours Task Sub Code Phase Description of Operations 1/16/2001 114:00- 16:00 2.00 BOPSUI; DECOMP ACCEPT RIG AT 14:00 HRS, 01/16/2001. N/U BOP Stack. 16:00 - 18:00 2.00 RIGU PRE Pick up injector head from pipe bay. Install guide arch. 18:00 - 18:30 0.50 RIGU PRE SAFETY MEETING with day and night crews. Review required safety meeting format and documentation as requested by drilling management. 18:30 - 20:30 2.00 RIGU PRE Stab CT into injector head. 20:30 - 21:30 1.00 RIGU PRE Installed CTC and pulled tested to 37k, OK 21:30 - 00:00 2.50 RIGU PRE RU berm around waste tank and outside associated equipment. Veco unable to supply correct trucking and sling equipment to install the slop tank. Called Peak to assist Veco in their endeavor 1/17/2001 00:00 - 02:15 2.25 RIGU PRE Finished RU Slop tank and associated outside equipment 02:15 - 02:45 0.50 RIGU PRE Installed CT dart and loaded CT with seawater, Vp = 59.2 bbl's 02:45 - 09:15 6.50 BOPSUI; DECOMP BOP test as per AOGCC. E-mailed report to AOGCC. 09:15 - 09:30 0.25 STWHIP WEXlT SAFETY MEETING, review ASA. Review BHA M/U steps and hazards. 09:30- 10:00 0.50 STWHIP WEXIT I M/U window milling BHA #1. 10:00 - 12:30 2.50 STWHIP WEXlT RIH with 3.80" HC 3.80" diamond mill and string reamer on straight motor. 12:30 - 13:00 0.50 STWHIP WEXlT HELD H2S DRILL AND RIG EVACUATION DRILL. All personnel [11] accounted for in primary muster area, Nordic Camp. Reviewed steps for securing well and evacution of personnel. Discussed location / number of Scot air packs on rig. All H2S alarms and warning lights worked on rig. NOTE: tested green slop tank with 150 bbls, hot fresh water. No leaks. Vac out tank. 13:00 - 13:15 0.25 s'rWHIP WEXlT Continue RIH to XN nipple at 10,576 ft BKB. Tagged at 10,585 ft CTD. [add 11 ft CTD]. 13:15 - 14:30 1.25 STWHIP WEXlT Mill out XN nipple to 3.80". 2.7 bpm, 1500 PSI. 30 minutes to mill thru. 1 stall. Back ream nipple, and ream down. No motor work. RIH. 14:30 - 16:30 2.00 STWHIP WEXIT Mill window, top of window at 10,863 ft. Mill to 10865 ft. 2.7 bprn, 2000 psi, 2 stalls to start milling. 16:30 - 18:45 2.25 STWHIP WEXlT Milled window from 10865 - 10867 ft. 18:45 - 19:28 0.72 STWHIP WEXIT Milled window from 10867' to 10868' 19:28 - 20:08 0.67 STWHIP WEXIT Milled window from 10868' to 10869' Mill in open hole section' 20:08 - 21:15 1.12 s'rWHIP WEXIT Milled window from 10869' to 10880' Mill in open hole section' 21:15 - 22:00 0.75 STWHIP WEXlT Reaming out window section with string mill 22:00 - 22:04 0.07 STWHIP WEXlT Reaming out window section and turn hole over to rio-pre 22:04 - 00:00 1.93 STWHIP WEXlT POOH with Window Milling BHA while displacing Wellbore with rio-pro. Turned hole over using 475 bbl rio-pre 1/18/2001 00:00 - 00:30 0.50 STWHIP WEXIT POOH with window milling BHA. Window = 10,863 - 10,869 ft. 00:30 - 01:30 1.00 DRILL PROD1 PU drilling BHA#1 01:30 - 03:45 2.25 DRILL PROD1 RIH with drilling BHA, Shallow hole tested MWD@ 1700', OK 03:45 - 03:52 0.12 DRILL PROD1 Corrected to flag, Added 9.5' to flag Mechanical = 10732' 03:52 - 03:57 0.08 DRILL PROD1 RIH to tag bottom, Tagged top of window at10863' PUH, tagged again 03:57 - 04:55 0.97 DRILL PROD1 Check TF orientation, 180 deg out, orient TF to high side, work through window. Tagged at 10882' PUH and start pump. Orient TF to approximately 30R 04:55 - 05:07 0.20 DRILL PROD1 Drilling 3-3/4" hole at 47R. Unable to apply wob and to achieve require reactive torque 05:07 - 06:30 1.38 DRILL PROD1 Orient TF around to highside. 06:30 - 08:30 2.00 DRILL PROD1 Drilling, TF = 7 R. 2.5 BPM, 3000 psi, 60 FPH. Drilled build section to 10,960 ft. 08:30 - 11:40 3.17 DRILL PROD1 Drilling, TF = 40 R. 2.5 BPM, 3000 psi, landed well in Shublik. Drilled to 11065 ft. Printed: 2/2612001 3:07:48 PM BP EXPLORATION Page 2 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 1/18/2001 I11:40 - 13:30 1.83 DRILL PROD1 POOH for horizontal drilling BHA. 13:30 - 14:00 0.50 DRILL PROD1 Lay out bit, motor, equalizer sub and MWD. 14:00 - 16:00 2.00 DRILL PROD1 M/U Bit #2, adjust motor to 1.0 deg bend, P/U Sperry resistivity / Gr tool. Test tool. M/U DS BHA. M/U injector head. 16:00 - 18:00 2.00 DRILL PROD1 RIH with BHA #3. DS49 used bit and 1.0 deg motor with resistivity tool. Shallow tested Sperry tools, continue RIH. 18:00 - 19:30 1.50 DRILL PROD1 Run bit out window to 10,880 ft. Add 10' to CTD and log MAD pass down at 100 FPH. TF at highside. Clean window, no wt loss. 19:30 - 20:28 0.97 DRILL PROD1 Tagged bottom, orient TF to 95R 20:28 - 21:27 0.98 DRILL PROD1 Drilling at 99R, 11065' to 11108' at approximately 30 to 60 fph 21:27 - 22:50 1.38 DRILL PROD1 Drilling at 91R 22:50 - 23:31 0.68 DRILL PROD1 Drilling, ROP 50 to 68 fpm 23:31 - 23:52 0.35 DRILL PROD1 Wiper trip to window at 10880' Clean trip 23:52 - 00:00 0.13 DRILL PROD1 Drilling with 120 R TF ROP slow, negative wt (-5000 lb) to get bit to drill 1/19/2001 00:00 - 00:26 0.43 DRILL PROD1 Orient TF around 00:26 - 01:30 1.07 DRILL PROD1 Drilled from 11187' to 11213' at 18 to 60 fpm with TF at 87 R 01:30 - 01:46 0.27 DRILL PROD1 Orient TF to 80 L 01:46 - 02:48 1.03 DRILL PROD1 Drill/sliding. Qp = 2.6 bpm at Pp = 3350 psi, TF = 80 L 02:48 - 03:05 0.28 DRILL PROD1 Orient TF to 100 L 03:05 - 04:15 1.17 DRILL PROD1 Drilling at 108R, ROP = 15 to 40 fph. Drilled to 11,300 ft. 04:15 - 04:40 0.42 DRILL PROD1 Wipertrip to window to improve ROP 04:40 - 05:00 0.33 DRILL PROD1 Drilling. TF=90L, Qp = 2.5 bpm@ 3700 psi, ROP 60 fph. 05:00 - 05:15 0.25 DRILL PROD1 Orient TF around to 82R 05:15 - 06:00 0.75 DRILL PROD1 Drilling, TF = 82R, ROP = 38 fph using -3k WOB 06:00 - 06:24 0.40 DRILL PROD1 Drilling ROP increased to 70 fph with 6k WOB, TF=70R. Drilled to 11,334 ft. 06:24- 06:30 0.10 DRILL PROD1 Oriented 1 click 06:30 - 08:00 1.50 DRILL PROD1 Drilling, TF = 87R with ROP @ 40 fph. Drilled to 11,370 ft. 08:00 - 09:15 1.25 DRILL PROD1 Drilled to 11,450 ft. 95 deg incl, 2.5 BPM, 3400 psi, TF of 120R. 09:15 - 10:15 1.00 DRILL PROD1 Wiper trip to window. Up wt. = 38K, dwn wt. 15K. Tied-in with GR. Add 5 ft to CTD. RIH to TD. Hole clean. 10:15 - 10:30 0.25 DRILL PROD1 Drilled to 11470 ft. TF -- 140R. 10:30 - 10:50 0.33 DRILL PROD1 Orient TF to 90 R. 10:50 - 11:30 0.67 DRILL PROD1 Drilled to 11528 ft. TF -- 95R, Incl dropped below 90 deg. 11:30 - 11:50 0.33 DRILL PROD1 Orient TF around to build Incl. 11:50 - 13:15 1.42 DRILL PROD1 Drilling, TF = 45R. ROP = 50 fph, 2.5 BPM, 3400 psi. Drilled to 11,600 ft. 13:15 - 14:15 1.00 DRILL PROD1 Wiper trip to window. Hole in good condition. RIH. Ream tight spot at 11,100 ft. RIH. 14:15 - 16:15 2.00 DRILL PROD1 Drilling, TF = 95R, ROP = 80-100 FPH, 2.5 BPM, 3400 psi. Incl = 89 deg. Drilled to 11,750' 16:15 - 17:00 0.75 DRILL PROD1 Wiper trip to window. Hole clean. Still getting 15 deg DLS with 1.0 deg motor. Decide to pull for 0.70 deg motor to reduce turns in well plan to target. 17:00 - 18:20 1.33 DRILL PROD1 POOH for 0.70 deg motor and new bit. 18:20 - 20:13 1.88 DRILL PROD1 OOH and download restristivey tool, change motor (0.7deg) PU new DS49 with 4-1 O's 20:13 - 23:30 3.28 DRILL PROD1 RIH to 10810' and added 10' to counter. Started pumps and achieve TF, Tie-in on GR marker at 10850' MD, Trouble getting 0.75 BH motor through widow at 10863', orienting TF around to get pass window. Tried several things to get thro window and was unsuccessful. Possibility of lip on bottom of skate which restrict 0.7 BH from passing Printed: 2/26/2001 3:07:48 PM BP EXPLORATION Page 3 of 14 Operations Summary Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Sub Phase Description of Operations Code 1/19/2001 20:13 - 23:30 3.28 DRILL PROD1 throughwhereas the 1.00 deg passes unrestricted. 23:30 - 00:00 0.50 DRILL PROD1 POOH to look at bit and BHA. PU ldeg BH to check WS and hole conditions prior to having BOT clean up window bottom ledge 1/20/2001 00:00 - 01:00 1.00 DRILL PROD1 POOH to change BHA configeration 01:00 - 01:33 0.55 DRILL PROD1 Change out BHA (Pulled bit was undamaged) to 1 deg BH, PURR bit #2 DS49 01:33 - 03:30 1.95 DRILL PROD1 RIH 03:30 - 04:15 0.75 DRILL PROD1 Work through window at 10863' MD. Tagged window at 10863' and orient TF to pass, Unable to pass window and varous TF. 04:15 - 06:00 1.75 DRILL PROD1 POOH to redress with with BOT window millnig system 06:00 - 07:15 1.25 DRILL PROD1 OOH, LD Sperry's BHA and PU window mill, string mill, motor and 2 its 2-3/8" CSH tubing. 07:15 - 09:15 2.00 DRILL PROD1 RIH with milling BHA to cleanout window. 09:15 - 10:00 0.75 DRILL PROD1 Stop at 10840 f. Add 10 ft CTD. Tag fill at 10865 ft. Pick up and ream down slow at 2.9 BPM, 3200 psi. Ream down to 10887 ft. 20 ff oUtside window. Back ream to 10850 ft. No stalls, no motor work. RIH no pump to 10,887 ft. Back ream across window. 10:00 - 11:30 1.50 DRILL PROD1 POOH, window in good condition. No wt loss or motor workthru window, up or down. 11:30 - 11:50 0.33 DRILL PROD1 Lay out milling BHA. 11:50 - 13:15 1.42 DRILL PROD1 M/U MWD Resistivity drilling BHA with 0.7 deg motor and DS 49 bit. Test resistivity. OK. 13:15 - 15:15 2.00 DRILL PROD1 RIH with MWD Resistivity drilling BHA. Stop at 10,800' and add 10 ft to CTD. 15:15 - 15:45 0.50 DRILL PROD1 Orient TF to highside. RIH, set down wt at 10865 ft. Fell thru. 15:45 - 16:15 0.50 DRILL PROD1 Log Tie-in with GR. Subtract 1.5 ft. 16:15 - 18:30 2.25 DRILL STAB PROD1 RIH. Ream shales in Shublik. Stacking wt, overpull, Ream to 11,190 ft. Back ream to window. 18:30 - 20:35 2.08 DRILL STAB PROD1 Ream down, ledge at 10,945 ft. Ream down. ROP approximately 0.5 to 4 fpm watching motor work and orientation WR to 11165' MD and unable to orient TD from 90 L to 95R 20:35 - 20:45 0.17 DRILL STAB PROD1 PUH to 10945' MD try and get orientation prior to going below 11165' Orient TF 20:45 - 21:15 0.50 DRILL STAB PROD1 WR at 20 fpm with 67R TF to 11193' with 180deg out of phase TF, Tried to Orient TF to 90 R.Unable to pass 11193' Unable to orient to correct TF. 21:15 - 22:34 1.32 DRILL STAB PROD1 Work CT and conduct mud swap to new rio-pro at 11195'. Tried orientation with new mud in the hole without success. '22:34 - 00:00 1.43 DRILL STAB PROD1 POOH chasing new flo-pro to surface 1/21/2001 00:00 - 00:45 0.75 DRILL STAB PROD1 POOH 00:45 - 02:15 1.50 DRILL STAB PROD1 LD restivity tool and change out orientator, Held well control drill and crew secured well in 15 seconds. 02:15 - 04:45 2.50 DRILL STAB PROD1 RIH with cleanout BHA. Stopped at 10800', added 10', Oriented TF to 30L 04:45 - 06:30 1.75 DRILL FILL PROD1 RIH, tagged window at 10863' (30L), oriented and trying to pass window at 10863' MD. Stall several times. Ream at window. Work CT. 06:30- 08:00 1.50 DRILL FILL PROD1 Work Bit past 10863' and down to 10878'. Able to run thru window [10863-10870'] with no wt loss. Stacking wt and stalling motor at 10,876'. Metal junk from window floating around. Unable to get past 10876' with bit. 108:00 - 09:45 1.75 DRILL FILL PROD1 POOH for taper mill and string reamer to mill up junk. 09:45 - 10:00 0.25 DRILL PROD1 SAFETY MEETING. Review procedure to cut CT. Printed: 2/2612001 3:07:48 PM BP EXPLORATION Page 4 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 1/21/2001 10:00 - 11:30 1.50 DRILL FILL PROD1 Cut off 400 ft of CT. Re-head CTC. Pull test I press test. M/U 3.80" taper mill and 3.80" string reamer to 0.7 deg motor. 11:30 - 13:50 2.33 DRILL FILL PROD1 RIH with taper mill to mill junk. Stop at 10800' and add 10' to CTD. 13:50 - 15:50 2.00 DRILL FILL PROD1 Went down thru window easily, TF = 80L. Stalled at 10,878 ft. Back ream thru window with TF -- 70L. Ream down at 7L. Stall at 10878 ft. Mill on junk for 30 min. Ream in hole at 2 FPM. Some stalls. Ream to 10920 ft. 15:50 - 19:00 3.17 DRILL FILL PROD1 Ream hole to 10980 ft. Back ream to window. Back ream window at 50R. Ream down window at 130R. Circulate 30 bbl very high viscosity 3ill at 2.9 BPM, 3550 psi. Back ream with 140L TF. Ream down Iowside TF. Back ream. Ream down twice. Window clean. 19:00 - 20:30 1.50 DRILL FILL PROD1 POOH with taper mill. 20:30 - 20:52 0.37 DRILL FILL PROD1 OOH, change out mill for PDC, Layed out Shock sub to exposure of rubber element below housing 20:52 - 23:00 2.13 DRILL FILL PROD1 RIH with CO BHA to 10800', added 10', oriented TF to 21L 23:00 - 23:15 0.25 DRILL FILL PROD1 RIH with 23L TF through window Tagged window at 10864' RIH pass window at 90 fpm and didn't see anything. Obtain TF for Cleanout 123:15 - 23:45 0.50 DRILL FILL PROD1 WR from window to 11123' and tagged with 67L TF 23:45 - 23:53 0.13 DRILL FILL PROD1 Orient TF 23:53 - 00:00 0.12 DRILL STAB PROD1 iWR to bottom and adjusting TF Tagged and worked through intervals at 11095', 11123' Hard cleanout occurred at 11163' to 11302' Pulled 70k 5 times while WR. RIH with normal running wt at 11302' 1/22/2001 00:00 - 01:30 1.50 DRILL STAB PROD1 Tagged and worked through intervals at 11095', 11123' Hard cleanout occurred at 11163' to 11302' Pulled 70k 5 times while WR. RIH with normal running wt at 11302' 01:30 - 01:47 0.28 DRILL STAB PROD1 RIH W/R to bottom normally Tagged at 11745' uncorrected. 01:47 - 02:30 0.72 DRILL STAB PROD1 PUH for wiper trip Pulling ratty from 11234' up to 11885' 02:30 - 03:09 0.65 DRILL STAB PROD1 Tie-in from 10885' Made +6' correction at 10911' 03:09 - 03:39 0.50 DRILL STAB PROD1 RIH WR to bottom Tagged at 11123', 11205' and 11212'. Clean sailing after 11303' to 11750' 03:39 - 03:47 0.13 DRILL STAB PROD1 Orient TF to drill 03:47 - 04:34 0.78 DRILL PROD1 Drilling with 58 to 90 RR, ROP -- 100 fpm, Drilled to 11800' 04:34 - 04:45 0.18 DRILL PROD1 Orient TF to left side 04:45 - 06:20 1.58 DRILL PROD1 Drilling at 111L TF, ROP -- 80 fph Drilled to 11900' 06:20 - 10:30 4.17 DRILL PROD1 Wiper trip to window. Several 20K overpulls in Shublik shales. RIH. Sat down at 11100'. Orient TF to 60R. Spud several times. Orient to 90R. Ream shales. 10:30 - 11:30 1.00' DRILL PROD1 Orient TF to high side. Spud with pump at 0.5 bpm, No luck. Orient TF to 90R. Spud several times. No luck. Appeared to have lost original sidetrack at 11,108 ft BKB. 11:30 - 13:30 2.00 DRILL PROD1 Drilling ahead. TF -- 110 R, 50 FPH, 2.4 bpm, 3000 psi, at 11,168 ft. Building inclination and turning to left with 110R TF. Need to check BHA. 13:30 - 15:20 1.83 DRILL PROD1 POOH to change BHA. 15:20 - 16:30 1.17 DRILL PROD1 Change motor, re-run bit, change MWD. 16:30 - 18:50 2.33 DRILL PROD1 RIH with MWD drilling BH^ with 1.0 deg motor and DS 49 bit. 18:50 - 19:10 0.33 DRILL PROD1 Added 10 ft to CTD at 10,800 ft. Tied-in with GR, 19:10 - 20:00 0.83 DRILL PROD1 Working 1 deg BH through window at 10863' using various TF's and running speeds 20:00 - 20:45 0.75 DRILL STAB PROD1 Working bit at 10911' at 45L 20:45 - 23:15 2.50 DRILL DIR PROD1 RIH to 11080' and orient TF to 140R to try and find old hole Bringing MW up to 10.2ppg with salt 23:15 - 00:00 0.75 DRILL DIR PROD1 RIH with 60R TF and tagged the new hole at 11160' MD. PUH to Orient Printed: 2/26/2001 3:07:48 PM BP EXPLORATION Page 5 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 1/22/2001 23:15 - 00:00 0.75 DRILL DIR PROD1 TF to 130R 1/23/2001 00:00 - 00:15 0.25 DRILL DIR PROD1 RIH with 135L TF to conpsentate for hole curvature Tagged at 11164' Took survey and it corresponds to hole #2 101 deg. 00:15 - 00:30 0.25 DRILL DIR PROD1 PUH to 10950' and Orient TF 125L 00:30 - 01:15 0.75 DRILL DIR PROD1 RIH from 10960' with a 123L TF. Tagged at 11184' MD, Survey cooresponds to new hole. conversed with town CTD Engineering and decide to use new hole. Set directional software. Set TF at 120R to drill 01:15 - 02:05 0.83 STKOH PROD1 Drilling at 11164' MD uncorrected. TF 113R Drilled to 11204' MD NOTE: Sidetrack starting depth at 11108' MD 02:05 - 03:05 1.00 STKOH PROD1 Drilling at 113 R to 130 deg TF with a ROP = 25 to 70 fph. Drilled to 11226' 03:05 - 03:06 0.02 STKOH PROD1 Oriented 1 click to drop angle 03:06 - 03:24 0.30 STKOH PROD1 Drilling and dropping angle at 150R TF, 1 click 03:24 - 03:26 0.03 STKOH PROD1 Oriented 1 click to 170R 03:26 - 03:54 0.47 STKOH PROD1 Drilling with 170R TF ROP @ 80 fph. Drilled to 11262' 03:54 - 04:01 0.12 STKOH PROD1 Wiper trip to window to check hole conditions to 10900' RIH, tight spot at 11167' botj in and out of hole, otherwise clean wiper trip 04:01 - 05:24 1.38 STKOH PROD1 Drilling at 158R 60 fph to 11342' 05:24 - 05:35 0.18 STKOH PROD1 Orient around to 90R to turn the horizontal ,05:35 - 08:35 1.00 STKOH PROD1 Drilling with 85R TF at 76-100 fph Drilled to 11410' 08:35 - 07:00 0.42 STKOH PROD1 Wiper trip to window, one overpull 07:00 - 07:30 0.50 STKOH PROD1 Tied-in with GR, Add 2 ft to CTD. 07:30 - 08:15 0.75 STKOH PROD1 RIH to TD 11,410 ft. Very clean hole. Salt and 9.2 PPG mud wt. have stabilized shales, for now. 08:15 - 09:40 1.42 STKOH PROD1 ;Drilling in Sag river. TF = 125R. 88 deg incl. 2.4 bpm, 3100 psi, ROP = 80 fph. TD = 11506' 09:40 - 10:30 0.83 STKOH PROD1 Drilling, TF = 108R. ROP = 90 FPH, 89 deg incl. TD = 11,570 ft. 10:30 - 12:00 1.50 STKOH PROD1 Wiper trip to window. RIH. Clean hole. 12:00- 12:30 0.50 STKOH PROD1 OrientTFto 110R. 12:30 - 14:50 2.33 STKOH PROD1 Drilling, TF = 113R. ROP = 65 FPH, 2.5 bpm, 3200 psi. Incl. = 87 deg. TD = 11,730 ft. 14:50-15:30 0.67 STKOH PROD1 Wiper trip to window. RIH. Clean hole. 15:30 - 16:30 1.00 STKOH PROD1 Drilling, TF -- 115R. ROP = 80 FPH. 2.5 BPM, 3300 psi, Incl = 88 deg. TD = 11,800 ft. 16:30 - 16:45 0.25 STKOH ;~ROD1 Orient TF to left side. 16:45- 18:16 1.52 STKOH ;~ROD1 Drilling, TF = 90L. ROP -- 70 FPH. Drilled to 11900' 18:16 - 19:15 0.98 STKOH PROD1 Wiper trip to confirm hole conditions at 11900' 19:15 - 19:30 0.25 STKOH PROD1 Orient TF to 85L 19:30 - 22:00 2.50 STKOH PROD1 Drilling at TF 85L ROP = 70 fph Drilling at 11985' MD 22:00 - 23:04 1.07 STKOH PROD1 Drilling at TF78L WOB, ROP @ 72 fph 12034' 23:04 - 23:35 0.52 STKOH PROD1 Drilling at TF90L WOB, ROP @ 50 to 70 fph Drilled to 12050' 23:35 - 00:00 0.42 STKOH ~PROD1 Wiper Trip to window 1/24/2001 00:00 - 00:41 0.68 STKOH PROD1 Wiper trip to window after drilling to 12050' MD 00:41 - 01:44 1.05 STKOH PROD1 Drilling with 67L TF, ROP -- 80 fph 121116' Oriented 1 click 01:44 - 02:17 0.55 STKOH PROD1 Drilling with 61L TF, ROP -- 80 fph Drilled to 12150' .02:17 - 02:30 0.22 STKOH PROD1 Orientated to right side 110R 02:30 - 03:45 1.25 STKOH PROD1 Drilling with 97R TF, ROP -- 80 fph Drilled to 12200' 03:45 - 05:45 2.00 STKOH PROD1 POOH to conduct weekly BOP Test and PU Sperry's res tool 05:45 - 06:30 0.75 STKOH PROD1 LD drilling BHA 06:30 - 13:00 6.50 STKOH PROD1 Weekly BOPE test. 13:00 - 14:40 1.67 STKOH PROD1 MU BHA w/resistivity 14:40 - 16:40 2.00 STKOH PROD1 RIH w/BHA #10 Printed: 2/26/2001 3:07:48 PM BP EXPLORATION Page 6 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 1/24/2001 16:40 - 17:00 0.33 STKOH PROD1 Add 10' at 10800' and saw btm of window at 10865' CTD. RIH to 10890'. Begin tie-in, subtract 1.0' 17:00 - 17:40 0.67 STKOH PROD1 Begin MAD pass for Harry at 10906', 2.5/3450. Bag it at 10941' and just try to get in hole thru shales. Log MAD pass from 11150-207' and same problem. RIH to 11370' and packing off 17:40 - 18:15 0.58 STKOH PROD1 Wiper to window to clean up hole 2.5/1.8. Continue up to EOT to clean up liner. Park at 10630' and check MM's 2.5/2.4 3450 18:15 - 19:15 1.00 DRILL PROD1 RIH to window, 90R. Orient to get thru. Keep stopping at 10925'. Work through slowly. 19:15 - 19:45 0.50 DRILL PROD1 RIH to btm. 12200'. Hole smooth in Sag. 19:45 - 20:45 1.00 DRILL PROD1 Mad pass resistivity OOH at 450 fph. 20:45 - 23:00 2.25 DRILL PROD1 Begin swapping to new mud while logging. Ship used mud to MI for use by 3S. 23:00 - 23:30 0.50 DRILL PROD1 RIH. 33k# up wt, 15k# dn wt. 2.3 bpm@2700 psi fs with new mud system. 23:30 - 23:59 0.48 DRILL PROD1 Drill ahead at 135R. 1/25/2001 00:00 - 01:15 1.25 DRILL PROD1 Drilling ahead. 2.6 bpm@3500 psi. TF:90-110R. 01:15 - 01:30 0.25 DRILL PROD1 Orient to maintain TF. 01:30 - 02:30 1.00 DRILL PROD1 Drill ahead with TF: 110R. 02:30 - 03:50 1.33 DRILL PROD1 Short trip to 10900'. A few bobbles in Shublik. Rest of hole very smooth. 03:50 - 04:15 0.42 DRILL PROD1 Cycle pumps to re-sync mwd. 04:15 - 04:45 0.50 DRILL PROD1 Drill ahead to 12448'. TF:90R 04:45 - 05:00 0.25 DRILL PROD1 Short trip. 05:00 - 05:45 0.75 DRILL PROD1 Drill ahead. Dropped angle whle holding 90R. 05:45 - 05:50 0.08 DRILL PROD1 PU to orient. 05:50 - 06:15 0.42 DRILL PROD1 Drill ahead at TF:45L. 06:15 - 07:10 0.92 DRILL PROD1 Short trip to window from 12550', hole is clean 07:10 - 07:30 0.33 DRILL PROD1 Tie-in 2.5/3170/15R, add 14.0' 07:30 - 08:30 1.00 DRILL PROD1 Wiper to TD 08:30 - 08:45 0.25 DRILL PROD1 Tag at 12560' corr TD 2.5/3180/58L. Orient to high side 08:45 - 11:30 2.75 DRILL PROD1 Drill 12560-732' down thru the Shublik and back up 11:30- 13:35 2.08 DRILL PROD1 Wiper to window, 36K, clean hole 13:35 - 14:20 0.75 DRILL PROD1 Drill 12732-797' back into Sag at 92 deg 2.5/3450/74R 14:20- 14:45 0.42 DRILL PROD1 i Orient around 14:45 - 15:20 0.58 DRILL PROD1 Drill 12797-817' stacking thruout 2.5/3400/62R 15:20 - 16:40 1.33 DRILL PROD1 300' wiper. RIH and work to get thru Shublik from 12600-12780' and can't get deeper. PUH to 12500', clean. Reream w/difficulty from 12710' to TD 16:40 - 17:00 0.33 DRILL PROD1 Try to drill and no motor differential 17:00 - 19:45 2.75 DRILL PROD1 POOH to check BHA (no overpulls!) 19:45 - 22:00 2.25 DRILL PROD1 Set back injector. Check motor & bit (ok). Download mwd data. LD resistivity tool. 22:00 - 23:59 1.98' DRILL PROD1 RIH. Tag window at 10860'. 1/26/2001 00:00 - 00:40 0.67 DRILL PROD1 Log GR tie in from 10915'. 3470 psi@2.6 bpm. Subtract 5' correction. Phz 1 00:40 - 01:30 0.83 DRILL PROD1 RIH to 12817'. Perfectly smooth hole. No bobbles in Sag or Shubik !. Mad log btm 20'. 01:30 - 01:45 0.25 DRILL PROD1 Orient to 80R. 01:45 - 03:00 1.25 DRILL PROD1 Drill ahead to 12885'. 38K # up, 15k# dn wt. 3800psi@2.7 bpm. Begin stacking wt. 03:00 - 04:00 1.00 DRILL PROD1 Short trip to window while waiting on vac trucks. 04:00 - 04:30 0.50 DRILL PROD1 RIH. Displace coil to new mud. Printed: 2/26/2001 3:07:48 PM BP EXPLORATION Page 7 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Date From-To Hours Task Sub Code Phase Description of Operations 112612001 04:30 - 05:20 0.83 DRILL PROD1 Work coil near btm. Unable to get differential pressure. Short trip & work to btm. Eventually got weight back. Acted like bit was balled up ? 05:20 - 06:00 0.67 DRILL PROD1 Drill ahead at 100R TF. 3550 psi@2.6 bpm. Drill to 12921'. 06:00 - 07:15 1.25 DRILL PROD1 Wait on orders from town. 07:15 - 08:15 1.00 DRILL PROD1 Drill 70'/hr 12921-975' 2.5/3400/99R w/7k positive string wt 08:15 - 08:30 0.25 DRILL PROD1 Orient to Iow side to level out for holding at 8617' TVD 08:30 - 09:00 0.50 DRILL PROD1 Attempt to drill and stacking. Ream 12900-975' and began losing ground 09:00 - 11:00 2.00 DRILL PROD1 Wiper to window. Hole.is clean 11:00 - 12:30 1.50 DRILL PROD1 Work 12900-TD. Obviously CT is at Iockup. Backream 75' several times to cut Iow side while add Lubetex. RIH and finese bit to within 10' of TD 12:30 - 14:00 1.50 DRILL PROD1 Thaw Fina Green and continue to attempt to get bit to TD-get to within 5' 14:00 - 16:20 2.33 DRILL PROD1 Pump 4 drums Fina Green with bit near TD and no progress. Work pipe and lost ground to new Iockup depth of 12941'. Phz 2 16:20 - 17:25 1.08 DRILL PROD1 Wiper to window, clean 17:25- 17:50 0.42 DRILL PROD1 Tie-in, add 15.0'. Flag at 10800' EOP ~17:50 - 19:30 1.67 DRILL PROD1 POOH for EBP 19:30 - 20:30 1.00 DRILL PROD1 Set back injector. LD BHA. 20:30 - 21:30 1.00 DRILL PROD1 MU 3-112" OH aluminum whipstock assy on 2 jts 2-318" PH6. 21:30 - 23:$9 2.48 DRILL PROD1 RIH with OH whipstock assy. (anchor, billet, mg tool, xo, 2 its ph6, xo, circ, dis, checks, nrj, cc:95.52'). Run at 75 fpm. 1/27/2001 00:00 - 02:00 2.00 DRILL PROD1 OH whipstock stuck at 10925'. Push 10K dh. Pull 80K up (42K) over. No movement. 02:00 - 02:30 0.50 DRILL PROD1 Tool came free on its own after "resting" in neutral wt. 02:30 - 03:15 0.75 DRILL PROD1 Unable to pull past tbg tail at 10611'. RIH. Through window, tight spot at 10940', on to setting depth of 12135' (top of whipstock) 38k# up, 15k# dn wt. 03:15 - 04:15 1.00 DRILL PROD1 Drop 0.625" ball. On seat after 50 bbls. Pressure to 2000 psi. Saw 1 st shear. Hold for 5 min. Pressure again. Never increased above 1200 psi at 0.5 bpm. 1:1 rtns. Able to RIH and POOH. Anchor apparently not set. 04:15 - 06:15 2.00 DRILL PROD1 Continue circulating at max rate 2.8@ 2700 psi. Cycle pipe. Work to try and set anchor. RIH to TD. Tag at 12969'. 06:15 - 09:40 3,42 DRILL PROD1 Circ min at TD while wo DS pump truck to disconnect 09:40 - 09:55 0.25 DRILL PROD1 Safety mtg re: Hi press pump 09:55 - 11:00 1.08 DRILL PROD1 Load and launch 15/16" ball. Ball on seat at 49.7 bbls. Found cement line frozen. PUH 42K while thawing. Use cement pump to pressure ball seat to 5600 psi and sheared out. Leave Weatherford aluminum WS assy at 12970' CTD 11:00 - 13:45 2.75 DRILL PROD1 POOH w/CT. Saw flag at 10889' (-6' ELMD) so WS is at TD. Approximate top of fish is at 12885' 13:45 - 14:00 0.25 DRILL PROD1 CCH. LD checks and upper disconnect 14:00- 14:20 0.33 DRILL PROD1 MU drilling BHA 14:20 - 16:20 2.00 DRILL PROD1 RIH w/BHA #13 (same as 11), Receive orders to fin cleanout and plugback 16:20 - 18:30 2.17 DRILL PROD1 CT was on depth at flag. RIH thru window, clean. Start pump 2.5/3500/60R. Ream limestone/shales at 15R from 10940-975' with numerous stalls that act more like junk than shales (just the nature of the Shublik) 18:30 - 19:45 1.25 DRILL PROD1 Clean out to 11003'. Inclination shows Iow side sidetrack. Discuss plug back with town, Printed: 2/26/2001 3:07:48 PM BP EXPLORATION Page 8 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 1/27/2001 19:45 - 20:45 1.00 DRILL PROD1 Log gr tie in for EOP flag. Add 5'. EOP flag at 10700'. 20:45 - 22:15 1.50 DRILL PROD1 POOH for cement assembly. 22:15 - 23:30 1.25 DRILL PROD1 Set back injector. LD drilling BHA, MU cementing assy (nozzle, pup, xo, 2 its 2-3/8 ph6, xo, checks, dis,nrj, cc: 78.10') 23:30- 23:59 0.48 DRILL PROD1 RIH. 1/28/2001 00:00 - 01:30 1.50 STKOH PROD1 'RIH with cementing nozzle BHA #14. Tag btm at 11009', 01:30 - 02:00 0.50 STKOH PROD1 Hold PJSM regarding cement job & clean up. 02:00 - 03:00 1.00 STKOH PROD1 Batch mix 9 bbls class G 17#. Pump 2 water. PT lines to 4000, Pump 9 bbls cement & 2 bbls water. Displace with rio-pre & rig pump (59 bbls). Lay in 1:1. No overpulls. ClP @ 0300 hrs. 03:00 - 04:00 1.00 STKOH PROD1 POOH to safety (10500'). Circ at min rate and allow cement to settle. 04:00 - 04:30 0.50 STKOH PROD1 Pump 1.5~ bio sweep. RIH. Wash to 10850'. 04:30 - 06:00 1.50 STKOH PROD1 Circulate OOH at 60%. Divert cement/bio outside. 06:00 - 06:30 0.50 STKOH PROD1 LD cementing assy. 06:30 - 07:10 0.67 STKOH PROD1 MU milling BHA 07:10 - 09:15 2.08 STKOH PROD1 RIH w/BHA #15 09:15 - 09:45 0,50 STKOH PROD1 On depth w/flag. Tag at 10862' and stall. Ream window area to 10870'. Nothing firm encountered and window is clean 09:45 - 14:15 4.50 STKOH PROD1 Circ above window, WO UCA test to show compressive strength (2.5 hrs behind ClP time) 14:15 - 14:40 0.42 STKOH PROD1 Cmt shows 250 psi in lab. RI H and mill 10' below window to 10880' w/o resistance 14:40- 16:10 1.50 STKOH PROD1 POOH 16:10- 16:30 0,33 STKOH PROD1 LD milling assy 16:30 - 17:05 0.58 STKOH PROD1 MU drilling BHA 17:05 - 18:45 1.67 STKOH PROD1 RIH w/BHA #15 (2.6 deg motor). Correct to flag. Tag up at 10873'. .18:45 - 19:30 0.75 STKOH PROD1 Orient & try to work thru window. Though window. Tag at 10877'. Orient to high side. 19:30 - 22:30 3.00 STKOH PROD1 Time drill to 10940'. 20-25 fph. 2900/2.5/HS. 22:30 - 23:59 1.48 STKOH PROD1 Drill by weight. Inc higher than original hole. Orient to keep HS tf. Drill to 10980'. 1/29/2001 00:00 - 03:00 3.00 DRILL PROD1 Drilling build. 2900/3400/2.3/0-10R, 90 deg at 11030'. 03:00 - 04:30 1.50 DRILL PROD1 Drill build to 11065. Avg 33 deg/100 dog leg. 20-40 ROP, HS ff. ; Project: 100 inc, 42 azm at bit 04:30 - 06:15 1.75 DRILL PROD1 POOH for lateral assy, 06:15 - 07:00 0.75 DRILL PROD1 Set back injector. LD drilling BHA 07:00 - 08:30 1,50 DRILL PROD1 PJSM. RU and cut 700; CT to manage life 08:30 - 09:30 1.00 DRILL PROD1 Install new packoff. Install new CTC. PT 35k, 3500 psi 09:30 - 09:55 0.42 DRILL PROD1 MU drilling BHA 09:55 - 11:55 2.00 DRILL PROD1 RIH w/BHA #17 (0.7 deg motor) 11:55 - 13:30 1.58 DRILL PROD1 Tie-in in 7" liner to BHCS at 10760' 2.6/3180/10L. Couldn't correlate 13:30 - 14:10 0.67 DRILL PROD1 RIH thru window, clean to 11051' CTD. Confirm surveys and are drilling formation. Wiper to tie-in in open hole 14:10 - 15:00 0.83 DRILL PROD1 Log tie-in logging up 2.5/3100/30R. Add 6,0', RIH 15:00 - 15:30 0.50 DRILL PROD1 Drilling 40-80'/hr 2.5/3100/90R from 11057'. Swap to new 9.2 ppg FIo Pro mud 15:30 - 18:30 3.00 DRILL PROD1 Fin mud swap. Drilling 70'/hr at 11175' 2.5/2900/150R 18:30 - 19:30 1.00 DRILL PROD1 Drilling 65 fph at 11230'. 2.5/3500/125R 19:30 - 20:30 1.00 DRILL PROD1 Drilling at 110 fph at 11320'. 160R 20:30 - 21:15 0.75 DRILL PROD1 Short trip to 10885', Hole smooth. 21:15-21:30 0.25 DRILL PROD1 Orientto 100R. 21:30 - 22:00 0,50 DRILL PROD1 Drilling at 11400'. 70 fph. 2,5/3400/120R 22:00 - 23:00 1.00 DRILL PROD1 Drilling at 11475'. 90 fph. 2.5/3500/150R Printed: 2/26/2001 3:07:48 PM BP EXPLORATION Page 9 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 1/29/2001 23:00 - 23:45 0.75 DRILL PROD1 Drill to 11530'. 23:45 - 23:59 0.23 DRILL PROD1 Short trip from 11530'. Hole smooth. 1/30/2001 00:00 - 00:15 0.25 DRILL PROD1 Short trip to window. Hole smooth. 00:15 - 00:30 0.25 DRILL PROD1 Orient around to TF: 115R 00:30-01:00 0.50 DRILL PROD1 Drilling 110fph at 11,610'. 2.8/3900/115R 01:00- 02:00 1.00 DRILL PROD1 Drilling 120 fph at 11700'. 2.6/3850/114R 02:00 - 02:30 0.50 DRILL PROD1 Drill to 11750' 02:30 - 03:15 0.75 DRILL PROD1 Short trip form 11750' to window. Hole smooth. 03:15 - 04:00 0.75 DRILL PROD1 Drilling at 90 fph at 11820'. 2.7/3800/125R 04:00 - 05:00 1.00 DRILL PROD1 Drilling at 130 fph at 11920'. 2.7/3950/120R 05:00 - 05:40 0.67 DRILL PROD1 Short trip to window. Hole smooth. A few bobbles in Shublik. 05:40 - 06:30 0.83 DRILL PROD1 Drilling at 120 fph at 12020'. 2.7/3900/120R 06:30 - 06:50 0.33 DRILL PROD1 Orient to 90L 06:50-07:30 0.67 DRILL PROD1 Drilling 130'/hr to 12175' 07:30 - 08:10 0.67 DRILL PROD1 Wiper to window 08:10 - 08:30 0.33 DRILL PROD1 Tie-in, add 6.0' 08:30 - 09:10 0.67 DRILL PROD1 RIH to corr TD at 12180'. Orient 09:10 - 10:50 1.67 DRILL PROD1 Drillling 130'/hr 2.5/3320/100L. Drill to 12360' 10:50 - 12:00 1.17 DRILL PROD1 Wiper to window 12:00 - 12:30 0.50 DRILL PROD1 Orient to right side 12:30 - 13:55 1.42 DRILL PROD1 Drilling 120'/hr 2.5/3400/110R. Drill to 12494' and looks like the Kingyak was penetrated at 12440'. Mud needs to be changed out 13:55 - 15:25 1.50 DRILL PROD1 Wiper to window. Start new mud on RIH 15:25 - 15:40 0.25 . DRILL PROD1 Orient to Iow side 15:40 - 17:00 1.33 DRILL PROD1 Drill to 12647' 17:00 - 18:10 1.17 DRILL PROD1 Wiper to window 18:10 - 19:10 1.00 DRILL PROD1 Make +8' correction. RIH. 19:10 - 20:10 1.00 DRILL PROD1 Resume drilling horizontal, fr/12650' 20:10 - 20:30 0.33 DRILL PROD1 12732', Tool face down to 135. Need to maintain 120 deg. Orient around to 120. 20:30 - 21:35 1.08 DRILL PROD1 Resume drilling. Holding 110 deg tool face. 21:35 - 22:25 0.83 DRILL PROD1 12856', Wiper trip. 22:25 - 23:05 0.67 DRILL PROD1 10890', Run back in hole. 23:05 - 23:40 0.58 DRILL PROD1 12856', Back on bottom, Drilling ahead. 2.5/3550/125R. 23:40- 23:45 0.08 DRILL PROD1 12894', Orient 170 R 23:45 - 23:59 0.23 DRILL PROD1 Return to drilling, holding straight down tool face. Gamma Ray curve still climbing. Depth 12915' at midnight. 1/31/2001 00:00 - 01:00 1.00 DRILL PROD1 Drill horizontal fr/12915', 2.5/3600/154R. 01:00 - 02:50 1.83,DRILL PROD1 12940', Tool face 109R, we appear to be leaving higher gamma's, and entering the cleaner sand again. 02:50 - 03:50 1.00 DRILL PROD1 13050', Wiper trip. 03:50 - 04:45 0.92 DRILL PROD1 10950', log tie in pass. Made +6' correction. Confirmed that GR log repeats previous runs. 04:45 - 05:30 0.75 DRILL PROD1 Run back in hole to resume drilling. 05:30 - 08:00 2.50 DRILL PROD1 13050', on bottom, resume drilling 2.5/3600/159R. 08:00 - 09:15 1.25 DRILL PROD1 Wiper to window. RIH at set down at 11010' at 90R 09:15 - 09:40 0.42 DRILL PROD1 PUH to just below window and park. Orient to high side, 13R 09:40- 10:45 1.08 DRILL PROD1 RIH 10:45 - 11:00 0.25 DRILL PROD1 Orient to right 11:00 - 14:00 3.00 DRILL PROD1 Drilling 50-60'/hr 2.4/3700/114R. Drill to 13334' and CT press is too high to make hole-need new mud 14:00 - 15:20 1.33 DRILL PROD1 Wiper to window. A few overpulls at 11120-60' 15:20 - 15:45 0.42 DRILL PROD1 Tie-in, add 8.0'. 2.3/3430/120R PUll to 10880' Printed: 2/26/2001 3:07:48 PM BP EXPLORATION Page 10 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 1/31/2001 15:45 - 16:05 0.33 DRILL PROD1 Orient to high side, 40R 16:05- 17:10 1.08 DRILL PROD1 RIH 17:10 - 17:25 0.25 DRILL PROD1 Orient to drill 17:25 - 18:00 0.58 DRILL PROD1 Drilling 50'/hr 2.4/3730/120R. Start new mud 18:00 - 19:30 1.50 DRILL PROD1 13335', Attempt to drill and pressures still high. 2.5/3600 Mini wipers while displace hole 19:30 - 21:15 1.75 DRILL PROD1 Still doing mud swap. Having difficulty getting started drilling again. Can pick up clean, and run back it, but weight stacks out. CTP comes up 300 lbs, but will not stall, even if weight stacked out. Dowell driller thinks that the bit cutting structure is gone. Will attempt to add more lubtex to mud prior to POH. 21:15 - 23:50 2.58 DRILL PROD1 13335', Added an additional 1% lubtex. Now up to 5.5%. Unable to make any hole. Able to pickup and RIH clean. Can carry good weight while RIH until setting down. POH to check bit and motor. 23:50 - 23:59 0.15 DRILL PROD1 Tag up at surface. Begin rig down of BHA. Bit and motor in good shape. 2/1/2001 00:00 - 00:50 0.83 DRILL PROD1 Continue laying down BHA # 17. 00:50 - 07:00 8.17 DRILL PROD1 !Weekly BOP test. 07:00 - 07:40 0.67 DRILL PROD1 I MU drilling BHA. Change Sperry orientor jet from 15 to 18, change out motor, MWD probe 07:40 - 10:15 2.58 DRILL PROD1 RIH w/BHA #18 (0.7 deg motor). SHT 2.4/2800 Grease injector 30 min 10:15 - 11:35 1.33 DRILL PROD1 Orient in liner from 130L to high side 2.4/2800/2R. RIH thru window. Start pump after set downs starting at 10888'. Ream thru several spots getting stalls. Work to a hard spot at 10938' and stalled motor 11:35 - 12:00 0.42 DRILL PROD1 Lost all returns (assumed packing off) and gradually came back to 2.5/1.7 while PUH into tbg tail to 10500', clean. Muse, muse. RIH to below tbg tail and check MM's 12:00 - 13:30 1.50 DRILL PROD1 Circ 0.4/0.3, 1.0/0.8, 2.4/1.4 @ 2750. Cuss n discuss. Circ at min and WO mud 13:30 - 14:00 0.50 DRILL PROD1 RIH from EOT, clean thru window. Start pump and had better returns 2.6/2.1 @ 2980/39L. Hole clean to 10938' and beyond. Losses increased to 1.0 bpm at 10960', 1.5 bpm at 11000', 2.0 @ 11088' set down, 110L. PUH clean to 10960' and get 3 clicks 14:00 - 14:50 0.83 DRILL PROD1 RIH clean from 10960'. Losing 1.8 bpm from 11100-400'. Red rate to 1.9/0.6 while RIH 14:50 - 17:15 2.42' DRILL PROD1 Hole was clean to tag at 12913' (in known fault area). PUH slow and circ at rain rate while WO mud 0.5/0.4 @ 1360 psi 17:15 - 17:35 0.33 DRILL PROD1 RIH from 12850', start new mud 2.5/1.7 at 2900/90R. A couple stalls at 12913', then RIH 2.5/1.0 and returns declining to 0.3 bpm by 13100' 17:35 - 19:00 1.42 DRILL PROD1 Tag TD at 13334'. Orient a couple clicks. Drilling 120'/hr 2.5/0.5 2900/126R Returns improved to 1.0 bpm in 15 min, 1.5 in 30 min 19:00- 19:10 0.17 DRILL PROD1 13460', drilling ahead. 2.6/2700/13R, 1.7 bpm returns. Loosing about 1 bpm. 19:10 - 21:20 2.17 DRILL PROD1 Wiper trip. POH had packing off at 10991', then when we got above it, returns went to 0.3 bpm. This could be a thief zone. 21:20 - 22:45 1.42 DRILL PROD1 Back on bottom, with pumps down getting 1.5 bbls returns for 0 pumped. Pumps on at 2.7 bpm, getting 1.9 returns. 22:45 - 23:30 0.75 DRILL PROD1 13623'. 2.6/2950/175R/1.8 bpm returns. Pointing straight down with motor, angle 95.1 deg. Trying to point down, and hole angle keeps building. '23:30 - 23:59 0.48 DRILL PROD1 13685', Wiper trip. Differentially stuck 5' off of bottom for a few moments. Pulled 70 klbs, got free, short trip. Printed: 2/26/2001 3:07:48 PM BP EXPLORATION Page 1 1 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 2/2/2001 00:00 - 00:45 0.75 DRILL PROD1 Short trip. Pumping 2.5, getting back 2.0 bpm off of bottom. Hole smooth, saw slight motor work and weight at 11170' and 11140'. 00:45 - 01:15 0.50 DRILL PROD1 Tie in at 10950', make +16' correction. 01:15 - 02:00 0.75 DRILL PROD1 RIH to resume drilling. 02:00 - 02:15 0.25 DRILL PROD1 Tag bottom at 13695', pick up to orient around to Iow side. 2.5/2930/159R, Getting 1.7 bpm returns. 02:15 - 03:15 1.00 DRILL PROD1 Trouble getting bit to drill. Same problem as yesterday. Could run in easily and tag, it would drill off, but then we could not run in any more without picking up first. Finally got it drilling after trying for 45 minutes. 03:15 - 04:15 1.00 DRILL PROD1 Drill to 13728'. Could not make hole further. Pulled 20k lbs over on pickup. Differentially sticking getting worse. Can not drill ahead without risking hole. Call this point TD. PUH for short (1000') wiper trip prior to POOH. 04:15 - 05:30 1.25 DRILL PROD1 Tag at 13728', POH at 30 fpm, pumping at 2.3 bpm. Getting 2.0 bpm back. No losses accross lower thief zone at 12914' during wiper trip. No returns with bit over zone at 10950' (plus or minus 25'). 05:30 - 06:45 1.25 DRILL PROD1 Condition accross the Shublik waiting on decision about top of slotted liner prior to POH. Get 100% losses every time we pass 10950'. 06:45 - 08:30 1.75 DRILL PROD1 POOH for liner 08:30 - 09:00 0.50 DRILL PROD1 LD drilling BHA 09:00 - 09:25 0.42 CASE' COMP RU to run liner 09:25 - 09:45 0.33 CASE COMP Safety mtg re: liner 09:45 - 14:00 4.25 CASE COMP MU 21 jts 2-7/8 STL slotted, 68 its 2-7/8 STL solid, 10 jts 3-3/16 TC-11 with misc assys in program 14:00 - 15:00 1.00 CASE COMP RU tools and run Baker LWP assy on 10 its CSH. Space out and intall Baker CTLRT 15:00 - 15:30 0.50 CASE COMP Install Baker CTC. PT 35K, 3500 psi 15:30 - 16:40 1.17 CASE COMP RIH w/liner 16:40 - 16:45 0.08 CASE COMP 39K, 18K @ 10800'. RIH clean thru window 16:45 - 17:00 0.25 CASE COMP Set down at 11062'. Work to get shoe joint heading uphill 0.4/0.4 @ 1330 psi 17:00 - 17:35 0.58 CASE COMP Finally get moving. RIH and watch turbos clean up the shales 0.4/0.2 @ 1365 at 11200'. RU DS cementers 17:35 - 17:50 0.25 CASE COMP 12.6K 0.4/0.3 @ 1475 at 12880' 65'/min 17:50 - 18:35 0.75 CASE COMP Set liner at 13728' CTD. PUH 42K. Set back on btm 0.4/0.3 1380 psi. Check losses 2.0/0.6 2100 psi. Load 5/8" steel ball. Displace with mud 2.3/0.5 @ 2580 psi initial, 2.3/1.0 @ 2800 at end. Red rate to 0.4 @ 42 bbls. Ball on seat at 47 bbls @ 1830, landed at 1500 psi, sheared at 4000 psi. Picked up ok, got good indication of release from liner top. Weight up 30 klbs. 18:35 - 19:15 0.67 CASE I COMP Circulate mud, waiting on KCL and dirty trucks. 19:15 - 19:30 0.25 CASE COMP Vac trucks on location, hold PJSM with rig crew, Dowell pumpers and CT crew. Mud man, Co. Man, etc. 19:30 - 21:30 2.00 CASE COMP Begin swapping well to KCL. 21:30 - 21:50 0.33 CASE COMP KCL around, continue circulating while cementers batch up. 21:50 - 22:55 1.08 CASE COMP Cementers up to weight. Circulation with KCL, in at 2.1 bpm, out 1.9 bpm. Down on rig pumps, prime and PT pumpers to 4000 psi, ok. On line with cement, pumping at 2.4 in/1.8 out. Pump 24 bbls Class G at 15.8 ppg. Shut down pumps, launch dart. Getting 0 in, 1.4 back while launching dart. Pump 2 bbls kcl, Check dart, confirm gone. Continue to displace with KCL. 2.8 in/1.9 out. Displace cement to divert sleeve, reduce rate to 2.2 in/2.2 out. Prior to landing dart, drop rate to 0.5 in/1.5 out. Land dart ok at exact bbl cnt. Printed: 2126/2001 3:07:48 PM BP EXPLORATION Page 12 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 2/2/2001 22:55 - 23:10 0.25 CASE COMP After dart sheared, 0.9 in for 0.9 out. Could not displace faster w/o losses. Land dart in floats at 68.2 bbls away (expected 68.8). Returns 23.3 back for 24 pumped. 0 returns after plug in place. Bled off/floats held fine. CIP @ 23:10, 2-2-01. Cemented liner with 24 bbls Class G @ 15.8 ppg, Yield 1.17 ft3/sk, additives 0.1 g/sk D047, 0.15 glsk D135, 2.0 g/sk D600, 0.45 % D065, 0.17% D800, 0.3% Ml17. 23:10 - 23:45 0.58 CASE COMP Unsting from deployment slv ok, hold and circulate biozan to end of CSH. Pumping 2.1 in/2.0 out. 23:45 - 23:59 0.23 CASE COMP Bio to end of CSH, lay in bio accross liner lap, POH. Did not jet over liner top for fear of breaking down cement job and causing losses into formation. 2/3/2001 00:00 - 01:00 1.00 CASE COMP Continue POOH to rig down liner deployment eq. 01:00 - 02:30 1.50 CASE COMP Tag up at surface, lay down liner running eq, stand back 10 jts of CS ' hydril pipe. 02:30 - 02:45 0.25 EVAL COMP PJSM prior to picking up radioactive source in SWS logging tool. 02:45 - 03:15 0.50 EVAL COMP RU SWS CNL logging tool. 03:15 - 04:20 1.08 EVAL COMP Pick up CS hydril jointed pipe and trip same into hole. 04:20 - 04:30 0.17 EVAL COMP Kick drill. 04:30 - 05:00 0.50 EVAL COMP Resume running CS hydrill pipe in hole. 05:00 - 05:35 0.58' EVAL COMP Pick up MHA and injector. 05:35 - 07:00 1.42 EVAL COMP Run in hole with coil. 07:00 - 08:20 1.33 EVAL COMP Log down from 10600-13002' CTD at 30'/rain, 17k. Cmt 500 psi 08:20 - 09:50 1.50 EVAL COMP PUH 41.3k logging same 30'/rain 09:50 - 11:10 1.33 EVAL COMP POOH w/CT 11:10 - 12:10 1.00 EVAL COMP Standback 40 stds CSH 12:10 - 12:20 0.17 EVAL COMP Safety mtg re: source 12:20 - 12:55 0.58 EVAL COMP LD load out SWS CNL tools 12:55 - 13:35 0.67 EVAL COMP PT wellbore to 2200 psi for 30 min and lost 150 psi. IA 325. Cmt 2000 psi 13:35 - 15:35 2.00 CLEAN COMP MU 2.31" mill, 2.125" motor, MHA. MU 40 stds CSH. MU 22 singles CSH 15:35 - 16:55 1.33 CLEAN COMP RIH w/CT 16:55 - 18:05 1.17 CLEAN COMP Set down at 10543' CTD (probably TOL based on following depths). RIH 18:05 - 19:50 1.75 CLEAN COMP Tag/stall at 12989' CTD. PU, add bio to system to bring vis up to 112 #/bbl. Mix up 30 bbls of 2#/bbl for sweeps in pill pit. 19:50 - 00:00 4.17 CLEAN COMP System up to 1/2#, begin milling on dart in latch collar at 12989' CTM. 1.5 bpm/1800 psi free spin. Pumping 2# sweeps every 40 bbls. GOt good indication of hitting float collar at 13000' CTM, and diverter sleeve at 13010' CTM. 2/4/2001 00:00 - 03:45 3.75 CLEAN COMP Continue milling on diverter sub at 13010' CTM (13056' ELM). Milled for 4 hours, and can't get through. Seem to be working the top of the diverter sub with out making any progress. 03:45 - 05:40 1.92 CLEAN COMP POOH to inspect mill. 05:40 - 08:20 2.67 CLEAN COMP Tag up at CTC, stand back injector, drop 5/8" ball to open circ sub (pulls dry) begin tripping jointed pipe. Standback 51 stds 08:20 - 08:45 0.42 CLEAN COMP LD BHA. Found 5/8" liner release ball wedged in between blades of mill. Outside cutting structure of mill is worn. MU new 2.25" mill, 2-1/8" motor, MHA 08:45 - 10:30 1.75 CLEAN COMP MU 51 stds CSH. MU 6 singles to manage CT life 10:30 - 12:10 1.67 CLEAN COMP RIH wi CT 12:10 - 12:20 0.17 CLEAN COMP Precautionary ream 12980' to set down/stall at 13014' CTD 12:20 - 18:45 6.42 CLEAN COMP Mill on TIW diverter sub and can't get past 13012.4' CTD 1.4/1850 Printed; 2/26/2001 3:07:48 PM BP EXPLORATION Page 13 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 2/4/2001 18:45 - 20:35 1.83 CLEAN COMP Milled on diverter sub since 12:20 PM. Are not making any progress, and are starting to see steel shavings on ditch magnets. Am concerned we are starting a lip and trying to sidetrack. Will POH for new mill with longer gauge section, and that is self centering. Also re examined mill from cleanout run #1. The 5/8" ball was deep enough in the water course of the mill face that all metal muncher teeth should still have cut ok. The ball was not the reason for the lack of penetration. 20:35 - 23:00 2.42 CLEAN COMP Tag up at CTC, drop 5/8" ball to open circ sub. Begin pulling jointed ~ipe. 23:00 - 23:45 0.75 CLEAN COMP At surface with Milling BHA #2. Found same wear pattern on second mill (2.25" od). The central cutters on the face of the mill look brand new. The cutters at the edge of the face are all chipped or badly worn. Plan to RIH with Milling BHA #3, with jars and a 2.31" D331 DSM. 23:45 - 23:59 0.23 CLEAN COMP RIH with BHA #23, Milling BHA #3, 2 1/8" motor, jars, 2.31" D331 DSM. 2/5/2001 00:00 - 01:15 1.25 CLEAN COMP Continue RIH with BHA #23, Milling BHA #3. 2 1/8" motor, jars, D331 DSM (2.31"). 01:15 - 03:30 2.25 CLEAN COMP All CSH deployed, PU injector, RIH with coil. 03:30 - 05:30 2.00 CLEAN COMP Stop at 12792', set depth at EOP flag to be consistent to last run. RIH. . Pumps on at 1.4 bpm, free spin 2550 psi. Weight check=41k lbs up weight. Tag up at 13009.8', stall, begin milling. 05:30 - 07:15 1.75 CLEAN COMP 13010.3', Continue milling. Had numerous stalls for first hour. Less stalls now, continuous motor work of about 300 psi. Now getting good work and some drill off. Almost looks as if we are milling out the inside of a nipple, or a collapsed joint. 07:15 - 08:20 1.08 CLEAN COMP Get to 13012.3' and had a few stalls to 13012.8'-broke thru 08:20 - 09:30 1.17 CLEAN COMP RIH slow to 13013.6', stacked and had motor diff. Mill slow to 13014.4' and stacking. Lost ground to 13012.6' 09:30 - 11:20 1.83' CLEAN COMP Remill with patience 13012.6-13013.8' w/little motor work and no stacking 11:20 - 13:20 2.00 CLEAN OTHR COMP Pinhole on reel (371K RF). Coilcade says probably at a factory weld at 9621' (derated to 25% in a 15% wear area). POOH filling from BS. 17k overpull at 10850' 13:20 - 15:30 2.17 CLEAN COMP Standback CSH workstring. LD BHA. Mill cutting structure in general showed no wear. Shoulder had sli wear (2.31" OD). SI swab 15:30 - 18:00 2.50 CLEAN COMP Cool down and PT DS N2 pumper. Blow down reel and bleed off pressure 18:00 - 23:59 5.98 CLEAN COMP Cut off CTC. Pull CT to reel. RD hardline. Install 2" inserts in bottom TOT rams. Swap 2 3/8" pipe with 2" pipe. Begin weekly BOPE test. 2/6/2001 00:00 - 03:00 3.00 CLEAN COMP Continue reel swap and BOP test. Install 15150' 2" 0.156" wall, HS-90 (81.3K max tensile) 03:00 - 04:00 1.00 CLEAN COMP Install horsehead. Fin test BOPE 04:00 - 13:00 9.00 CLEAN COMP Swap injector parts to 2" 13:00 - 15:00 2.00 CLEAN COMP Prep reel and pull to injector. Replace injector motor traction cylinder. Stab CT. Adjust wt indicator 15:00 - 16:30 1.50 CLEAN COMP Stab pipe into injector. 16:30 - 17:30 1.00 CLEAN COMP Install weld on connector (GBR) 17:30 - 18:00 0.50 CLEAN COMP Pull test to 20K#. 18:00 - 18:30 0.50 CLEAN COMP PJSM with crews regarding pipe size change. 18:30 - 19:30 1.00 CLEAN COMP Circulate 0.8125" ball through coil.(weld on connector id:0.9") 19:30 - 22:30 3.00 CLEAN COMP RIH with BHA & 53 stands 1.25" CSH (parabolic mill, 2.125 Navidrill ,mtr, CS,HDC,CV, 108 jts 1.25" CSH, HDC, CC OAL:3382.9') Printed: 2/26/2001 3:07:48 PM BP EXPLORATION Page 14 of 14 Operations Summa Report Legal Well Name: J-24 Common Well Name: J-24A Spud Date: 1/21/1987 Event Name: REENTER+COMPLETE Start: 1/16/2001 End: Contractor Name: NORDIC CALISTA Rig Release: Group: COIL Rig Name: NORDIC 1 Rig Number: Date From-To Hours Task Sub Code Phase Description of Operations 2/6/2001 22:30 - 23:59 1.48 CLEAN COMP RIH with milling assy. 2/7/2001 00:00 - 00:30 0.50 CLEAN COMP Continue to RIH. Tag float equipment at 13013'. 00:30 - 01:30 1.00 CLEAN COMP Begin milling jewelry. 3350/1.5 FS. (back on full rate). Multiple stalls. 01:30- 03:00 1.50 CLEAN COMP Milling at 13015'. 3820/1.5 DP 03:00 - 04:15 1.25 CLEAN COMP Continue milling ahead. Appear to break through at 13016' 04:15 - 05:15 1.00 CLEAN COMP Appear to be pushing junk down hole. Continue to mill ahead slowly. i05'15 - 07:00 1.75 CLEAN COMP Redress diverter sub while waiting on bleach truck. 107;00 - 07:15 0.25 CLEAN COMP SAFETY MEETING, Review hazards and procedures for pumping bleach. 07:15 - 08:30 1.25 CLEAN COMP Pump 20 bbls Bleach [ 6 ppb Lithium Hypochlorite ], displace to mill. Lay in bleach across 660 ft of slotted liner. 08:30 - 11:00 2.50 CLEAN COMP Circulate well to 1% KCL water while POOH. 1.5 BPM, 3400 psi. Pull BHA to surface. 11:00 - 13:00 2.00 CLEAN COMP Safety Meeting with PBU management team. Circ. at minimum rate. Monitor well, full returns. 13:00 - 15:30 2.50 CLEAN COMP Lay out CSH workstring in singles. 108 jts. Recover full BHA. Mill in good condition. 15:30 - 17:00 1.50 CLEAN COMP RIH with nozzle to 2000 ft and freeze protect 4 1/2" tubing with MEOH. 17:00 - 18:00 1.00 CLEAN COMP Pump N2 at surface and blow down reel. Bleed down N2 press in coil. Pump 1500 scfpm for 10 min. 18:00 - 23:00 5.00 CLEAN COMP ND BOPS. Clean pits. Continue to prep rig for move. 23:00 - 23:59 0.98 CLEAN COMP N/U tree cap and press test. OK. Pull rig off well. RELEASED NORDIC #1 RIG AT 23:59 HRS, 02/07/01. TOTAL TIME ON WELL WAS 22 DAYS, 10 HRS. Printed: 2/26/2001 3:07:48 PM 14-Feb-01 AOGCC 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well J-24A Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 10,957.44' MD Window / Kickoff Survey: 10,965.30' MD Projected Survey: 13,728.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, Survey Manager Attachment(s) DEFINITIVE North Slope Alaska Alaska Drilling & Wells PBU_WOA J Pad, Slot J-24 J-24A Surveyed: f February, 2001 SURVEY REPORT 13 February, 2001 Your Ref: AP1500292f68101 Surface Coordinates: 5970771.00 N, 643545.00 E (70° 19' 39.3269" N, Kelly Bushing: 79.20ft above Mean Sea Level 148° 50' 08.9982" VI/) OR'ILL. 1NG SIB lqVl C~, I= S Survey Ref: svy10743 A I.l~lllburton Company North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Survey Report for J.24A Your Ref: APl 500292168101 Surveyed: f February, 200f Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 10957.44 64.060 34.700 8603.64 8682.84 10965.30 69.170 35.640 8606.76 8685.96 11004.30 81.650 38,490 8616.57 8695.77 11031.70 90.350 36,210 8618.48 8697.68 11061.91 99.580 29.880 8615.86 8695.06 11095.51 101.430 11134.51 101.160 11170.31 100,020 11211.31 98,000 11253.31 97.120 8609.73 8602.10 8595.51 8589.09 8583.56 31.990 33.040 36.910 37.960 42.36O 8688.93 8681.30 8674.71 8668.29 8662.76 11287.11 95.800 44.640 8579.76 8658.96 11323.31 93.950 46.580 8576.69 8655.89 11356.11 92.640 49.040 8574.80 8654.00 11408.31 93.250 54.840 8572.12 8651.32 11449.51 92.020 58.350 8570.22 8649.42 11488.51 90.000 61.340 8569.53 8648.73 11521.31 88.420 63.450 8569.99 8649.19 11563.31 87.630 67.500 8571.43 8650.63 11596.51 88.150 72.070 8572.66 8651.86 11627.51 88.150 75.410 8573.66 8652.86 DEFINITIVE Alaska Drilling & Wells PBU WOA J Pad 11660.31 88.150 79.100 8574.72 8653.92 11691.51 88.070 82.960 8575.75 8654.95 11724.11 88.330 86.830 8576.77 8655.97 11757.31 88,510 90.350 8577.69 8656,89 11792.51 87.980 95.440 8578.77 8657.97 11826.91 87.450 98.610 8580.14 8659.34 11857.11 87.190 101,950 8581.55 8660.75 11897.71 86.840 107.570 8583.67 8662.87 11931.11 86.840 111.970 8585.51 8664.71 11964.11 87.360 116.540 8587.18 8666,38 5404.48 N 1857.45 E _5410.38 N 1861.61E 5440.42N 1884.33 E 5462.12 N 1900.89 E 5487.30 N 1917.29 E 5515.64N 1934.27 E 5547,89 N 1954.83 E 5576,72N 1975.00 E 5608.87 N 1999.61E 5640.68 N 2026.45 E 5665.04N 2049.57 E 5690.27 N 2075.35 E 5712.26 N 2099.61E 5744.38 N 2140.63 E 5767.03 N 2174.98 E 5786.62 N 2208.70 E 5801.81N 2237.76 E 5819.23 N 2275.94 E 5830.70N 2307.06 E 5839.37N 2336.80 E 5846.60 N 2368.77 E 5851.46N 2399.57 E 5854.36 N 2432.02 E 5855.18 N 2465.19 E 5853.40N 2500.32 E 5649.20 N 2534.43 E 5843.82N 2564.10 E 5833.49 N 2603.30 E 5822.21N 2634.67 E 5808.68 N 2664.71E Global Coordinates Dogleg Northings Easfings Rate (ft) (rt) (°/lOOft) 5976210.03 N 645298.72 E 5976216.00 N 645302.76 E 5976246.47 N 645324.90 E 5976268.49 N 645341.05 E 5976293.98 N 645356.96 E 5976322.64 N 645373.39 E 5976355.27 N 645393.33 E 5976384.48 N 645412.94E 5976417.10 N 645436.94E 5976449.41N 645463.17 E 5976474.21N 645485.82 E 5976499.93 N 645511.10 E 5976522.38 N 645534.94 E 5976555.28 N 645575.34 E 5976578.59 N 645609.25 E 5976598.82 N 645642.58 E 5976614.57 N 645671.35 E 5976632.71N 645709.19 E 5976644.77 N 645740.09 E 5976654.01N 645769.66 E 5976661.85 N 645801.48 E 5976667.30 N 645832.18 E 5976670.82 N 645864.57 E 5976672,27 N 645897.72 E 5976671.17 N 645932.87 E 5976667.62 N 645967.06 E 5976662.80 N 645996.83 E 5976653.23 N 646036.21E 5976642.55 N 646067.80 E 5976629.59 N 646098.09 E Vertical Section Comment -1385.70 Tie on point 65.93 -1385.43 Kick off point 32.77 -1382.73 32.82 -1380.66 36.99 -1380.63 8.27 2.73 11.09 5.54 10.59 7,76 7,39 8,49 11.16 9.02 9.25 8.04 9.82 13.84 10.77 11.24 12.37 11.89 10.61 14.53 9.34 11.08 13.85 13.15 13.92 -1381.82 -1382.14 -1380.93 -1377.79 -1372.61 -1366.48 -1358.61 -1350.24 -1333.33 -1316.86 -1299.25 -1283.15 -1260.62 -1240.76 -1220.54 -1197.67 -1174.49 -1148.85 -1121.48 -1091.05 -1060.15 -1032.33 -993.84 -961.38 -928.82 13 February, 2001 - 17:19 Page 2 of 5 DriilQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for J-24A Your Ref: APl 500292168101 Surveyed: f February, 2001 North Slope Alaska Measured Depth (ft) Incl. Az|re. Sub-Sea Depth (ft) 11996.91 87.630 121.460 8588.61 8667.81 12027.11 88.150 123.920 8589.72 8668.92 12058.11 89.740 120.230 8590.30 8669.50 12092.91 91.490 116.190 8589.92 8669.12 12121.91 91.490 113.550 8589.17 8668.37 12152.11 90.350 110.740 8588.68 8667.88 12194.71 88.330 110.390 8589.17 8668.37 12236.71 88.680 107.570 8590.27 8669.47 12266.91 90.180 103.880 8590.57 8669.77 12303.51 91.140 100.190 8590.15 8669.35 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (~) (~) (~) (~) (~) 5792.80 N 2693.36 E 5976614.26 N 646127.04-E 5776,50N 2718.76 E. 5976598.45 N 646152.75 E 5760,04N 2745.02E 5976582.50 N 646179.32 E 5743,60N 2775.67E 5976566.65 N 646210.28 E 5731.40N 2801.97 E 5976554.96 N 646236.81E 5720.02N 2829.94 E 5976544.12 N 646264.99 E 5705,06N 2869.82E 5976529.92N 64630215 E 5691.41N 2909.52E 5976517.03 N 646345.10 E 5683.22 N 2938.68 E 5976509.40 N 646374.31E 5675.60N 2974.37 E 5976502.46 N 646410.24 E 12331.31 91.230 96.320 8589.57 8668.77 12367.11 91.320 91.580 8588.78 8667.98 12419.91 91.760 97.910 8587.36 8666.56 12469.91 91.410 102.830 8585.97 8665.17 12506.51 90.000 104.940 8585.52 8664.72 12538.71 88.860 107.750 8585.84 8665.04 12578.11 88.240 112.850 8586.84 8666.04 12610.11 88.070 115.660 8587.87 8667.07 12647.51 86.920 118.820 8589.50 8668.70 12684.71 86.480 123.570 8591.65 8670.85 12723.31 85.340 126.910 8594.40 8673.60 12762.51 86.130 130.780 8597.32 8676.52 12794.91 86.920 136.400 8599.28 8678.48 12827.11 87.360 140.970 8600.89 8680.09 12862.51 87.540 146.070 8602.47 8681.67 12905.31 86.130 148.530 8604.83 8664.03 12939.31 85.170 152.750 8607.41 8686.61 12970.91 85.870 156.620 8609.88 8689.08 13000.91 86.660 158.370 8611.83 8691.03 13030.71 87.190 164.000 8613.43 8692.63 5671.61N 3001.87 E 5976499.00 N 646437.81E 5669.14 N 3037.56 E 5976497.22 N 646473.55 E 5664.78N 3090.14 E 5976493.86 N 646526.20 E 5655.78 N 3139.29 E 5976485.81N 646575.51E 5647.00N 3174.81E 5976477.71N 646611.19 E 5637.94N 3205.71E 5976469.24 N 646642.26 E 5624.28 N 3242.63 E 5976456.29 N 646679.44E 5611,14 N 3271.79 E 5976443.71N 646708.84 E 5594.04N 3305.01E 5976427.25 N 646742.38 E 5574.81N 3336.77 E 5976408.63 N 646774.50 E 5552.60 N 3368.21E 5976387.03 N 646806.36 E 5528.09N 3398.65 E 5976363.10 N 646837.26 E 5505.80N 3422.06E 5976341.26 N 646861.10 E 5481.65 N 3443.29 E 5976317.52 N 646882.78 E 5453.22 N 3464.31E 5976289.50 N 646904.34 E 5417.27 N 3487.39 E 5976253.99 N 646928.11E 5387.73 N 3504.01E 5976224.78 N 646945.29 E 5359.25 N 3517.48 E 5976196.57 N 646959.30 E 5331.60N 3528.94 E 5976169.14 N 646971.29 E 5303.44N 3538.53 E 5976141.17 N 646981.42 E Dogleg Rate (°/100ft) Alaska Drilling & Wells PBU WOA J Pad Vertical Section Comment 15.01 -896.14 8.32 -865.96 12.96 -834.98 12.65 -800.31 9.1o -771.61 10.04 -741.96 4,81 -700,37 6.76 -659.63 13.19 -630.80 10.42 -596.64 13.92 -571.40 13.24 -540.12 12.01 -493.65 9.86 -447.53 6.93 -412.96 9.42 -382.11 13.04 -343.70 8.79 -312.09 8.98 -274.92 12.80 -237.81 9.12 -199.35 10.05 -160.47 17.48 -128.69 14.24 -97.74 14.40 -64.63 6.62 -25.68 12.69 4.34 - 12.41 31.15 6.39 55.82 18.95 79.2O 13 February, 2001.17:f9 Page 3 of 5 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for J-24A Your Ref: AP1 500292168101 Surveyed: 1 February, 2001 North Slope Alaska Measured Sub-Sea Depth Incl. Azim. Depth (ft) (ft) Vertical Local Coordinates. Depth Northings Eastings (ft) (ft) 13062.11 86.750 164.880 8615.09 8694.29 5273.24 N 3546.94 E 13091.51 86.480 166.640 8616.83 8696.03 5244.79 N 3554.16 E 13121.11 87.360 171.210 8618.42 8697.62 5215.79 N 3559.83 E 13154.31 87.800 175.070 8619.82 8699.02 5182.86 N 3563.80 E 13188.51 88.240 178.940 8621.00 8700.20 5148.74 N 3565.58 E 13220.31 88.860 182.630 8621.81 8701.01 5116.96N 3565.15 E 13250.31 89.210 186.500 8622.32 8701.52 5087.06N 3562.76 E · 13281.71 89.560 189.660 8622.65 8701.85 5055.98 N 3558.35 E 13310.91 89.560 192.480 8622.88 8702.08 5027.33 N 3552.74E 13345.91 88.860 187.200 8623.36 8702.56 4992.86N 3546.76 E 13379.91 87.540 191.770 8624.43 8703.63 4959.35 N 3541.16 E 13416.31 86.480 197.750 8626.33 8705.53 4924.21N 3531.91E 13468.71 90.260 201.090 8627.82 8707.02 4874.83 N 3514.50 E 13505.51 93.690 200.910 8626.55 8705.75 4840.50 N 3501.32 E 13552.31 92.640 202.320 8623.97 8703.17 4797.06N 3484.11E 13597.71 94.920 198.450 8620.97 8700.17 4754.61N 3468.33 E 13649.51 93.160 195.990 8617.32 8696.52 4705.26 N 3453.03 E 13707.91 91.320 194.760 8615.04 8694.24 4648.99 N 3437.56 E 13728.00 91.320 194.760 8614.58 8693.78 4629.57 N 3432.45 E Global Coordinates Northings Easfings (ft) (ft) _5976111.13 N 646990.40 E 5976082.83 N 646998.17 E 5976053.94 N 647004.40 E 5976021.10 N 647008.99 E 5975987.01N 647011.42 E 5975955.23 N 647011.60 E 5975925.29 N 647009.78 E 5975894.13 N 647005.96 E 5975865.38 N 647000.91E 5975830.80 N .646995.59E 5975797.19 N 646990.63 E 5975761.88 N 646982.05 E 5975712.18 N 646965.59 E 5975677.60 N 646953.07 E 5975633.84 N 646936.69 E 5975591.09 N 646921.73 E 5975541.46 N 646907.38 E 5975484.91N 646892.99 E 5975465.39 N 646888.25 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 26.713° (17-Jan-01) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well Reference and calculated along an Azimuth of 123.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13728.00ft., The Bottom Hole Displacement is 5763.21ft., in the Direction of 36.554° (True). Dogleg Rate (°llOOff) 3.13 6.05 15.70 11.69 11.38 11.76 12.95 10.12 9.66 15.22 13.98 16.66 9.62 9.33 3.75 9.88 5.83 3.79 0.00 Alaska Drilling & Wells PBU WOA J Pad Vertical Section Comment 102.70 124.25 144.81 166.06 186.14 203.09 217.37 230.60 241.50 255.26 268.81 280.19 292.48 300.13 309.35 319.24 333.29 350.96 357.25 Projected Survey 13 February, 2001 - 17:19 Page 4 of 5 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for J.24A Your Ref: APl 500292168101 Surveyed: f February, 200f North Slope Alaska Alaska Drilling & Wells PBU WOA J Pad Comments Measured Depth fit) Station Coordinates TVD Northings Eastings (rt) (ft) (ft) Comment 10957.44 8682.84 5404.48 N 1857.45 E Int. Az 10957.44 8682.84 5404.48 N 1857.45 E Tie on point 10965.30 8685.96 5410.38 N 1861.61 E Kick off point 13728.00 8693.78 4629.57 N 3432.45 E Projected Survey Survey tool program for J.24A From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0.00 10800.00 8577.08 10800.00 8577.08 13728.00 8693.78 Survey Tool Description Good Gyro (J-24) MWD Magnetic (J-24APB1) 13 February, 2001 - 17:19 Page 5 of 5 DrillQuest 2.00.06 14-Feb-01 AOGCC 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well J-24APB2 ,I Dear Dear Sir/Madam: OQ~ OO"~-~1~ Enclosed are two survey hard copies and 1 disk Tie-on Survey: 11,038.04' MD Window / Kickoff Survey: 11,071.45' MD Projected Survey: 12,975.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, Survey Manager Attachment(s) RECEIVED lv!¢,~:,' 1 2001 ~'~t. ~. Nasl~ 0il & G,is cons. Commission Anch~race North Slope Alaska Alaska Drilling & Wells PBU_WOA J Pad, Slot J-24 J-24APB2 Surveyed: 27 January, 2001 DF. FINI IyE SURVEY REPORT 13 February, 2001 Your Ref: AP1500292168671 Surface Coordinates: 5970771.00 N, 643545.00 E (70' 19' 39.3269' N, Kelly Bushing: 79.20ft above Mean Sea Level 148° 50' 08.9982" Vt/) hRILLIN~ A Hal#burton Company Survey Reh svyfO?42 North Slope Alaska Measured Depth fit) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 11038.04 89.630 39.880 8621.89 8701.09 11071.45 96.830 53.320 8620.00 8699.20 11104.10 96.500 52.200 8616.21 8695.41 11141.60 101.070 51.500 8610.48 8689.68 11173.10 102.570 54.310 8604.03 8683.23 11206.90 102.570 11241.30 100.630 11278.50 97.560 11313.10 93.510 11343.50 90.260 8596.67 8589.75 8583.86 8580.53 8579.53 57.120 61.690 68.020 68.020 72.240 8675.87 8668.95 8663.06 8659.73 8658.73 11375.30 91.490 74.700 8579.04 8658.24 11405.90 91.050 78.390 8578.36 8657.56 11440.10 90.260 83.140 8577.97 8657.17 11474.10 88.420 87.360 8578.36 8657.56 11510.10 89.030 91.930 8579.17 8658.37 11545.30 89.300 96.150 8579.68 8658.88 11578.30 87.190 101.600 8580.69 8659.89 11609.50 87.190 105.820 8582.22 8661.42 11642.30 87.270 110.560 8583.81 8663.01 11672.90 87.190 114.250 8585.29 8664.49 Sperry-Sun Drilling Services Survey Report for J.24APB2 Your Ref: APl 500292f6867f Surveyed: 27 January,. 2001 11703.30 87.360 119.530 8586.73 8665.93 11734.90 87.190 123.920 8588.24 8667.44 11766.70 86.840 128.320 8589.89 8669.09 11800.50 88.070 131.660 8591.39 8670.59 11833.30 87.450 127.790 8592.68 8671.88 11870.70 87.630 123.750 8594.28 8673.48 11900.30 86.920 120.760 8595.69 8674.89 11938.50 86.750 116.190 8597.80 8677.00 11971.30 87.360 112.670 8599.49 8678.69 12004.10 87.450 108.800 8600.97 8680.17 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) fit) fit) (ft) 5466.28 N 1904.69 E 5976272.72 N 645344.77 E 5489.15 N 1928.85 E 5976296.04N 645368.48 E 5508.77 N 1954.67E 5976316.16 N 645393.92 E 5531.66 N 1983.80 E 5976339.60 N 645422.61E 5550.25 N 2008.39 E 5976358.66 N 645446.84 E 5568.83 N 2035.65 E 5976377.76 N 645473.73 E 5585.97 N 2064.64E 5976395.45 N 645502.40 E 5601.56N 2097.88 E 5976411.67 N 645535.33 E 5614.45N 2129.81E 5976425.17 N 645567.00 E 5624.77 N 2158.37 E 5976436.04N 645595.37 E 5633.82 N 2188.85 E 5976445.66 N 645625.67 E 5640.93'N 2218.60 E 5976453.35 N 645655.27 E 5646.42N 2252.34 E 5976459.48 N 645688.91E 5649.24N 2286.22 E 5976462.94 N 645722.72 E 5649.46N 2322.20 E 5976463.85 N 645758.69 E 5646.98 N 2357.30 E 5976462.05 N 645793.83 E 5641.89 N 2389.87E 5976457.58 N 645826.50 E 5634.51N 2420.14 E 5976450.78 N 645856.90 E 5624.29 N 2451.26E 5976441.15 N 645888.20 E 5612.64N 2479.51E 5976430.05 N 645916.67 E 5598.91N 2506.58 E 5976416.84 N 645944.00 E 5582.32N 2533.42 E 5976400.76 N 645971.16 E 5563.60 N 2559.07 E 5976382.54 N 645997.16 E 5541.90 N 2584.93 E 5976361.34 N 646023.43 E 5520.96N 2610.14 E 5976340.89 N 646049.03 E 5499.12 N 2640.45 E 5976319.63 N 646079.76 E 5483.35 N 2665.45 E 5976304.34 N 646105.05 E 5465.17 N 2698.97 E 5976286.80 N 646138.92 E 5451.62 N 2728.79 E 5976273.83 N 646168.99 E 5440.02N 2759.42 E 5976262.82 N 646199.84 E D£FtN TIyL Alaska Drilling & Wells PBU_WOA J Pad Dogleg Vertical Rate Section (°lt00ft) -1379.74 45.56 -1371.93 3.55 -1360.97 12.33 -1349.00 9.95 -1338.50 8.11 -1325.77 14.18 -1310.78 18.72 -1291.40 11.71 -1271.64 17.51 -1253.31 8.65 -1232.67 12.14 -1211.60 14.08 -1186.29 13.54 -1159.41 12.80 -1129.36 12.01 -1098.57 17.70 -1068.48 13.51 -1039.07 14.44 -1007.41 12.05 -977.37 17.36 -947.19 13.89 -915.64 13.86 -883.94 10.52 -850.43 11.94 -817.89 10.80 -780.57 10.37 -751.01 11.95 -713.00 10.88 -680.61 11.79 -648.60 Comment Tie on point Open hole ST DrillQuest 2.00.06 13 February, 2001 - 17:20 Page 2 of 5 Sperry-Sun Drilling Services Survey Report for J.24APB2 Your Ref: APl 500292168671 Surveyed: 27 January, North Slope Alaska Measured Depth (fi) Incl, Azim. Sub-Sea Depth Vertical Depth (ft) 12031.70 88.770 106.170 8601.88 8681.08 12061.70 87.630 103.180 8602.82 8682.02 12095.30 87.890 98.080 8604.14 8683.34 12128.10 88.420 94.570 8605.19 8684.39 12165.70 89.380 93.690 8605.92 8685.12 12202.30 89.870 98.260 8606.16 8685.36 12236.10 87.930 101.780 8606.80 8686.00 12282.30 87.670 106.890 8608.58 8687.78 12315.90 87.050 109.710 8610.13 8689.33 12352.70 86.170 113.760 8612.30 8691.50 12385.30 85.730 116.410 8614.61 8693.81 12417.10 85.290 120.990 8617. t0 8696.30 12457.70 85.460 126.100 8620.37 8699.57 12495.50 84.320 129,620 8623.74 8702.94 12538.50 84.580 128.740 8627.90 8707.10 12578.10 85.990 130.150 8631.16 8710.36 12611.50 88.460 128.560 8632.77 8711.97 12650.90 91.370 130.680 8632.83 8712.03 12685.70 91.010 133.670 8632.11 8711.31 12719.30 90.930 138.430 8631.54 8710.74 12752.30 91.980 141.600 8630.70 8709.90 12782.90 92.070 146.540 8629.62 8708.82 12818.50 93.430 147.480 8627.91 8707.11 12854.50 93.780 152.920 8625.65 8704,85 12885.90 93.510 154.510 8623.65 8702.85 12915.30 93.510 158.370 8621.85 8701.05 12947.70 93.600 162.070 8619.84 8699.04 12975.00 93.600 162.070 8618.12 8697.32 Local Coordinates Global Coordinates Northings Eastings Northings Easfings (ft) (ft) (ft) (ft) 5431.74N 2785.73 E 5976255.04 N 646226.30 E 5424.14 N 2814.74 E 5976248.00 N 646255.45 E 5417.95 N 2847.72 E 5976242.44 N 646288.55 E 5414.34N 2880.30 E 5976239.45 N 646321.19 E 5411.63 N 2917.80 E '5976237.46 N 646358.73 E 5407.82N 2954.19 E 5976234.35 N 646395.18 E 5401.94N 2987.46 E 5976229.11N 646428.56 E 5390.52 N 3032.17 E 5976218.54 N 646473.49 E 5379.98 N 3064.03 E 5976208.61N 646505.55 E 5366.38 N 3098.15 E 5976195.67 N 646539.92 E 5352.59 N 3127.60 E 5976182.45 N 646569.62 E 5337.37N 3155.40 E 5976167.77 N 646597.71E 5315.02 N 3189.12 E 5976146.06N 646631.85 E 5291.92 N 3218.64E 5976123.53 N 646662.00 E 5264.88 N 3252.01E 5976097.13 N 646695.69 E 5239.81N 3282.49E 5976072.65 N 646726.64E 5218.65 N 3308.28 E 5976051.99 N 646752.83 E 5193.53 N 3338.63 E 5976027.46 N 646783.65 E 5170.18 N 3364.41E 5976004.60 N 646809.88 E 5146.00N 3387.72 E 5975980.87 N 646833.64 E 5120.72 N 3408.91E 5975956.00 N 646855.32 E 5095.97 N 3426.85 E 5975931.60 N 646873.73 E 5066.14 N 3446.21E 5975902.15 N 646893.66 E 5034.98 N 3464.06 E 5975871.33 N 646912.10 E 5006.88 N 3477.94E 5975843.51N 546926.51E 4979.99 N 3489.67 E 5975816.84 N 646938.75 E 4949.56N 3500.61E 5975786.63 N 646950.27 E 4923.64N 3508.99 E 5975760.87 N 646959.15 E Dogleg Rate (°llOOff) 10.66 10.66 15.19 10.82 3.46 12.56 11.89 11.07 8.58 11.24 8.22 14.42 12.55 9.75 2.12 5.03 8.79 9.14 8.65 14.17 10.12 16.14 4.64 15.11 5.13 13.10 11.40 0.00 Alaska Drilling & Wells PBU_WOA J Pad Vertical Section Comment -622.02 -593.56 -562.53 -533.24 -5OO.32 -467.72 -436.62 -392.89 -360.43 -324.41 -292.21 -260.60 -220.15 -182.64 -140.09 -100.88 -67.72 -28.59 5.75 38.47 70.01 98.54 131.02 162.96 189.90 214.38 -240.13 ' 261.28 Projected Survey DrillQuest 2.00.06 13 February, 2001 - 17:20 Page 3 of 5 Sperry-Sun Drilling Services Survey Report for J-24APB2 Your Ref: AP1500292f68671 Surveyed: 27 January, 200f North Slope Alaska Alaska Drilling &'Wells PBU WOA J Pad All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 26.713° (17-Jan-01) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well Reference and calculated along an Azimuth of 123.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12975.00ft., The Bottom Hole Displacement is 6046.10ff., in the Direction of 35.477° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Easfings (ft) (~t) (ft) Comment 11038.04 8701.09 5466.28 N 1904.69 E Tie on point 11071.45 8699.20 5489.15 N 1928.85 E Open hole ST 12975.00 8697.32 4923.64 N 3508.99 E Projected Survey 13 February, 2001. I?:20 Page 4 of 5 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for J-24APB2 Your Ref: AP1 500292168671 Surveyed: 27 January, 2001 North Slope Alaska Alaska Drilling & Wells PBU WOA J Pad Survey tool program for J-24APB2 From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0.00 10800.00 8577.08 10800.00 8577.08 12975.00 8697.32 Survey Tool Description Good Gyro (J-24) MWD Magnetic (J-24APB1) 13 February, 2001 - 17:20 Page 5 of 5 DrillQuest 2.00.06 14-Feb-01 AOGCC 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well J-24APB1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 10,800.00' MD Window / Kickoff Survey: 10,863.00' MD Projected Survey: 11,900.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, Survey Manager Attachment(s) North Slope Alaska Alaska Drilling & Wells PBU_WOA J Pad, Slot J-24 J.24APBf Surveyed: 22 January, 2001 DEFINITIVE S UR VEY REPORT 13 February, 2001 Your Ref: AP1500292168f70 Surface Coordinates: 5970771.00 N, 643545.00 E (70° 19' 39.3269" N, Kelly Bushing: 79.20ft above Mean Sea Level 148° 50' 08.9982" W) O RII-L. I Nl~ .S E I~V I C:: E'S Survey Ref: svy10741 A HIIIIburton Company North Slope Alaska Measured Depth (ft) 10800.00 10863.00 10894.24 10927.64 10957.44 Incl. 41.500 41.500 47.110 54.670 64.060 73.210 82.790 89.630 96.830 97.090 10986.84 11016.24 11038.04 11071.45 11096.25 Azim. 28.209 28.190 30.400 32.700 34.700 36.700 38.500 39.880 53.320 57.900 Sub-Sea Depth (ft) 8497.88 8545.07 8567.42 8588.47 8603.64 8614.34 8620.45 8621.89 8620.00 8616.99 Sperry-Sun Drilling Services Survey Report for J.24APB1 Your Ref: APl 500292168170 Surveyed: 22 January, 2001 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Easfings (ft) (ft) (ft) (ft) (ft) 8577.08 8624.27 8646.62 8667.67 8682.84 8693.54 8699.65 8701.09 8699.20 8696.19 11132.45 95.950 63.190 8612.88 8692.08 11165.45 94.100 67.770 8609.98 8689.18 11196.05 92.330 72.710 8608.27 8687.47 11225.45 93.390 77.460 8606.80 8686.00 11257.65 95.240 73.410 8604.38 8683.58 DEFINITIVE Alaska Drilling & Wells PBU WOA J Pad 11290.65 93.660 67.770 8601.81 8681.01 11320.05 94.630 67.770 8599.69 8678.89 11353.65 95.680 73.760 8596.67 8675.87 11392.25 94.890 77.290 8593.11 8672.31 11426.65 93.570 82.220 8590.57 8669,77 11457,65 90.480 83,630 8589.48 8668.68 11497.85 88.550 87,330 8589.82 8669.02 11527.65 88.280 90,150 8590.64 8669.64 11557.25 90.570 93,320 8590.94 8670.14 11588.45 91.280 98,080 8590.43 8669.63 11622.45 92.780 103.010 8589.23 8668.43 11656.85 92.780 108,480 8587.56 8666.76 11684.85 91.630 112.000 8586.48 8665.68 11717.05 89.250 116.410 8586.23 8665.43 11749.40 87.450 119.000 8587.17 8686.37 5305.34N 1799.24E 5976109.79 N 645242.41E 5342.13 N 1818.96 E 5976146.95 N 645261.43 E 5361.14 N 1829.65 E 5976166.16 N 645271.75 E 5383.19 N 1843,23 E 5976188.47 N 645284.90 E 5404.48 N 1857.45 E 5976210,03 N 645298,72 E 5426.68 N 1873.43 E 5976232.53 N 645314.26 E 5449.44N 1890.96 E 5976255.62 N 645331.35 E 5466.28 N 1904.69 E 5976272.72 N 645344.77 E 5489.15 N 1928.85 E 5976296.04 N 645368.48 E 5503.05 N 1949.16 E 5976310.33 N 645388.52 E 5520.72 N 1980.46 E 5976328.60 N 645419.48 E 5534.36N 2010.36E 5976342.81N 645449.11E 5544.68 N 2039.11E 5976353.68 N 645477.65 E 5552.24N 2067.47 E 5976361.78 N 645505.87 E 5560.31N 2098.54 E 5976370.44 N 645536.78 E 5571.24N 2129.56 E 5976381.96 N 645567.58 E 5582.34N 2156.70 E 5976393.58 N 645594.51E 5593.36 N 2188.28 E 5976405.20 N 645625.87 E 5602.96N 2225.49 E 5976415.51N 645662.89 E 5609.06N 2259.24 E 5976422.26 N 645696.52 E 5612.87N 2289.98 E 5976426.66 N 645727.18 E 5616.04N 2330.04E 5976430.59 N 645767.17 E 5616.70 N 2359.82 E 5976431.82 N 645796.93 E 5615.80 N 2389.40 E 5976431.49 N 645826.53 E 5612.70 N 2420.44E 5976428.98 N 645857.61E 5606.49 N 2453.83 E 5976423.41N 645891.12 E 5597.17 N 2486.89 E 5976414.72 N 645924.35 E 5587.49 N 2513.13 E 5976405.55 N 645950.77 E 5574.29 N 2542.49 E 5976392.91N 645980.38 E 5559.26 N 2571.12 E 5976378.43 N 646009.29 E Dogleg Rate (o/,ioort) Vertical Section Comment -1380.53 0.02 -1384.02 18.62 -1385.41 23.25 -1386.03 32,03 -1385.70 .: 31.76 -1384.40 33.13 -1382.09 32.00 -1379.74 45.56 -1371.93 18.36 -1362.47 14.86 -1345.84 14.92 -1328.20 17.12 -1309.71 16.53 -1290.04 13.79 -1268.38 17,70 -1248.32 3.30 -1231.60 18.03 -1211.11 9.33 -1185.14 14.80 -1160.15 10.96 -1136.45 10.38 -1104.58 9.50 -1079.96 13.21 -1054.66 15.42 -1026.95 15.15 -995.56 15.88 -962.76 13.22 -935.47 15.56 -903.66 9.75 -871.47 Tie on point MWD Magnetic KOP Int. Az Int. Az Int. Az Int. AZ Int. AZ 13 February, 2001 - 17:19 Page 2of4 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for J.24APBI Your Ref: AP1500292168170 Surveyed: 22 January, 2001 North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Depth Incl, Azim. Depth Depth Northings Eastings (ft) (fi) (r-t) (ft) (fi) 11779.80 90.180 119.700 8587.79 8666.99 5544.36N 2597.61 E 11817.20 90.180 120.580 8587.68 8666.88 5525.59 N 2629.95 E 11851.80 88.510 121.110 8588.07 8667.27 5507.85 N 2659.65 E 11900.00 88.510 121.110 8589.33 8668.53 5482.95 N 2700.91E Global Coordinates Northings Easfings (ft) (ft) 5976364.05 N 646036.06 E 5976345.89 N 646068.76 E 5976328.72 N 646098.79 E 5976304.62 N 646140.51E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 26.713° (17-Jan-01) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well Reference and calculated along an Azimuth of 123.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11900.00ft., The Bottom Hole Displacement is 6112.09ft., in the Direction of 26.225° (True). Dogleg Rate (°llOOft) 9.27 2.35 5.06 0.00 Alaska Drilling & Wells PBU WOA J Pad Vertical Section Comment -841.14 -803.79 -769.22 -721.06 Projected Survey Comments Measured Station Coordinates Depth TVD Northings Easfings (ft) (ft) (ft) (ft) Comment 10800.00 8577.08 5305.34 N 1799.24 E Tie on point 10863.00 8624.27 5342.13 N 1818.96 E KOP 10894.24 8646.62 5361.14 N 1829.65 E Int. Az 10927.64 8667.67 5383.19 N 1843.23 E Int. Az 10957.44 8682.84 5404.48 N 1857,45 E Iht. Az 13 February, 2001.17:19 Page 3 of 4 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for J-24APBI Your Ref: AP1500292168170 Surveyed: 22 January, 2001 North Slope Alaska Measured Station Coordinates Depth TVD Northings Easfings (fi) (fi) (fi) Comment Alaska Drilling & Wells PBU WOA J Pad Comments (Continued) 10986.84 8693.54 5426.68 N 1873.43 E Int. Az 11016.24 8699.65 5449.44 N 1890.96 E Int. Az 11900.00 8668.53 5482.95 N 2700.91 E Projected Survey Survey tool program for J-24APB1 From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0.00 10800.00 8577.08 10800.00 8577.08 11900.00 8668.53 Survey Tool Description Good Gyro (J-24) MWD Magnetic (J-24APB1) 13 February, 2001 - 17:19 Page 4 of 4 DrillQuest 2.00.06 S T A T E OF ALASKA ALASKA OIL AND GAS CONSER VA TION COMMISSION TONY KNOWLES, GOVERNOR 333 W. 7th Ave., Suite 100 Anchorage, AK 99501 PHONE: (907) 279-1433 FAX: (907) 276-7542 Ted Stagg CT Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, Ak 99519-6612 Pxe~ Prudhoe Bay Unit J-24A BP Exploration (Alaska) Inc. Permit No: 200-214 Sur Loc: 583'SNL, 803'WEL, SeC. 09, T11N, R13E, UM Btmhole Loc. 3689'NSL, 2543'EWL, Sec. 03, T1 IN, R13E, UM Dear Mr. Stagg: . Enclosed is the approved application for permit to redrill the above referenced well. 'The permit to redrill does not. exempt you from obtaining additional permits required by law from other, governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this f'~ day of January, 2001 all f/Enclosures cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASK(~ ~IL AND GAS CONSERVATION COM(" .~SION PERMIT TO DRILL 20 AAC 25.005 I [] Exploratory I-I Stratigraphic Test [] Development Oil Re-EntryDrill [][] DeepenRedrill lb. Type of well [] Service [] Development Gas ~' S~ ~gle Zone [] Multiple Zone la. Type of work 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 79.20' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028281 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 583' SNL, 803' WEL, SEC. 09, T11 N, R13E, UM Prudhoe Bay Unit At top of productive interval .8. Well Number 4847' NSL, 1073' EWL, SEC. 03, T11 N, R13E, UM J-24A Number 2S100302630-277 At total depth 9. Approximate spud date 3689' NSL, 2543' EWL, SEC. 03, T11N, R13E, UM 01/05/0001 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028278, 1590' MDI No Close Approach 2560 13807' MD / 8626' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 10870' MD Maximum Hole Angle Maximum surface 1871 psig, At total depth (TVD) 8615' / 2905 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Couplin,q Length MD TVD MD TVD (include stage data) 3-3/4" 3-3/16" 6.2# L-80 TCll 340' 10560' 8320' 10900' 8573' 73 cu ft Class 'G' 3-3/4" 2-7/8" 6.16# L-80 ST-L 2907' 10900' 8573' 13807' 8626' Uncemented Slotted Liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. ' Present well condition summary Total depth: measured11700 feet Plugs (measured) DEC 9 : 000 true vertical 9251 feet Effective depth: measured 11657 feet Junk (measured) Alaska 0il & Gas Cons. Commission true vertical 9219 feet Anchorage Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 9 cu yds concrete 110' 110' Surface 2663' 13-3/8" 3755 cuft Permafrost 'C' 2701' 2682' Intermediate Production 10805' 9-5/8" 575 cuft Class 'G' 10843' 8609' Liner 1143' 7" 384 cu ft Class 'G' 10557' - 11700' 8397' - 9251' Perforation depth: measured Open: 11308'- 11323', 11325'- 11355', 11375'- 11400' Sqzd: 11355' - 11371' true vertical Open: 8958' - 8969', 8970' - 8993', 9008' - 9026' Sqzd: 8993' - 9005' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Ted Stagg, 564-4694 Prepared By Name/Number: Ter#e Hubble, 564-4628 21. I hereby certify that the foregoij~g ~ true and correct to the best of my knowledge __ Sign,~d TedStagg ,'~~" Title CT Drilling Engineer Date /~.7~/~ ~;"~'~ ' !~'~ ~;" ~,~]'~i'i"" I~ ,~,~' ~'~ ~.~" ~"P .... ;~ ~:' ~, ~'~ ~'r,~,.',~ ~',.~ ~r,, '~ '~L,~' ~J~'~ ''~' ~'~'""~ ' ~'~'~' ' ' ~ ;~ ~" ~';~' a~!~,'~ ' ~i~;~ ' ~'~'' ~" ~ ~'~'~ ~;'"'"'' '~ . '..~',..=..~.,,. ~.,,~,~.'~....,', ~..,,~., .,~ .~',~!~'~.,~I .~,I.,~ ,.~:~ , ~ ~ ~, ~t~i~ ....... ~,~ ' ,'..fl;.~,'~, ~", ~..' il '.,~ ~ ..... Permit Number / I APl Nur~ber Approyal Date, See cover letter (~_~.?~"/O// other ... .~-,~./~_ 150-029-21686-01 for requirements Conditions of Approval: Samples Required [] Yes ~ No Mud Log~Required [] Yes ~ No Hydrogen Sulfide Measures ~ Yes [] No Directional Survey Required .~ Yes [] No Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K ~.5K psi for CTU Other: ©RIGINAL SIGNED B'f by order of Approved By O Taylor Seamount Commissioner the commission Date~/~~/ Form 10-401 Rev. 12-01-85 ORIGINAL Triplicate bp J-24a Sidetrack Summary of Operations: J-24 is suffering from both high GOR and high water cut. The sidetrack, J-24a, will exit the 7" liner in the Sag R. interval and target the Sag R. Existing perfs will be squeezed by pumping approx. 20 bbls cement past the whipstock. The J-24a completion will involve cementing 3 3/16" x 2 7/8" solid liner across the initial open hole while placing a 2 7/8" slotted liner across the Sag R. completion interval. Phase 1: Drift, set whipstock on E-Line, mill window. Planned for Dec. 27-29, 2000. · Wellhead seals have been tested. · Tubing integrity has been confirmed. · All GLM's have been dummied off. · The IA will be loaded and pressure tested. · A dummy whipstock drift has been run on slickline. · A Kinley caliper has been run across the tubing and liner. · CTE-Line will set the whipstock at approx. 10,860' MD (8543'ss). Phase 2: Drill and Complete sidetrack: Planned for Jan. 5, 2001. RECEIVED DEC 19 2000 Alaska 0il & Gas C0'ns. Commission Anchorage Drilling coil will be used to drill and complete the directional hole as per attached plan. The sidetrack will be completed with a slotted/solid-cemented liner. Top of 3 3/16" liner to be approx. 10,560' MD (8320' ss). Mud Program: · Phase 1: Seawater · Phase 2: FIo-Pro (8.6 - 8.7 ppg) Disposal: · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 2 7/8" slotted/solid liner will be run from TD to approx. 10,900' MD (8573'ss). 2 7/8" slotted liner will be used within the Sag R. completion interval and solid liner (3 3/16" x 2 7/8") will be used from the top of slotted liner to the top of the liner at 10,560' (8320'ss). The crossover between the 2 7/8" solid/cemented and the 2 7/8" slotted liner will be at approx. 11,700' MD (8587'ss). The 3 3/16" x 2 7/8" solid liner will be cemented with approx. 13 bbls cement. Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2000 psi. Directional · See attached directional plan. BHL (State Plane): 646,800; 5,975,107. Max. hole angle is 96 deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · An MWD Gamma Ray log will be run over all of the open hole section. · A real time Resistivity Log will be run in open hole and a memory CNL will be run in cased hole. '~d~ds ~-- ~ C~ .,,) · The highest H2S recorded to date on J Pad is 60 ppm on J-26 on 9/20/00. ~' · Lo--on risk is Iow. Length of hole to drill is high (2937 ft) and may not be a Reservoir Pressure Res. press, is estimated to be 2905 psi at 8615ss. Max. surface pressure with gas (0.12 psi/ft) to surface is 1871 psi. TREE: CAMERON 6" WELLHEAD: McEVOY ACTUATOR: AXELSON , -O.4a 13-3/8", 72#/ft, L-80, BTRS I 2701' FOC KOP: 1700' MAX ANGLE: 48° 4-1/2", 12.6#/ft, L-80, BUTT TUBING TUBING ID: 3.958" CAPACITY: 0.0152 BBL/FT 9-5/8", 47#/ft, L-80, NSCC I 4600' Top of 3 3116" liner approx. 10560' TOPOF I 10557, I 7" LINER 9-5/8", 47#/ft, L-80, BTRS I 10843' I Whipstock to be set at approx. 10860'. Existing perfs to be sqz'ed past the whipstock. Sag R. to be completed wi cemented & slotted liner. PERFORATION SUMMARY REF: LOG: BHCS 2-4-87 SIZE SPF INTERVAL OPEN/SQZ'D 3 3/8" 4 11308 - 11323 OPEN 3 3/8" 4 11325 - 11355 OPEN 3 3/8" 4 11355 - 11371 SQZD 3 3/8" 4 11375 - 11400 OPEN PBTD i 11657' J 7", 26#/ft, L-80, IJ4S I 11700'1~ Com KB. ELEV = 79.22' BF. ELEV = 41.22' SSSV LANDING NIPPLE I I (OTIS "HXO")(3.813" ID) 2087' GAS LIFT MANDRELS OTIS LBD w/RA LATCH N~ MD(BKB) TVDss #8 3056 2921 #7 5639 4851 #6 7087 5844 #5 7784 6330 #4 8522 6846 #3 9103 7280 #2 9839 7808 #1 10380 8189 SLIDING SLEEVE OTIS XA (3.813" MIN. ID) TOP OF PBR 9-5/8" PACKER (TIW HBBP)(4.750"ID) I 10420' I I I 10516' I 4-1/2", 12.6#/ft, L-80 TAILPIPE 4-1/2 .... X" NIPPLE I (OTIS) (3.813" ID) I 4-1/2 .... XN" NIPPLE I (OTIS)(3,725" ID) I 4-1/2" SHEAROUT SUBI 10548' I 10579' I 10611' ! (ELMD)I 10608' I .~ " 2 7/8" slotted ' Special cross,-over from Unique Machine to be located approx, 20 ft outside window DEC 1 9 ~000 Alaska 0il & Gas Cons. Commission Anchorage Vertical Section 8500 8550 8600 8650 8700 8750 8800 0 500 1,000 rel M5 J-24 Path Distance (Feet] 1,500 2,000 Angle @ K.O.= 42 deg MD:10870 J-24a case501 Oct. 18,2000 Ted x4694 2,500 3,000 3,500 Tot Drld:2937 ft 13807 TD Marker Depths ~)rig Wellbore IKick Off 8,5501ft TVD 10,8701fl MD IDeprlr @KO 5,663 ft MD KO Pt lO,87oI MD New Hole 2937I I Total MD 13,807! TVD "rD 8,6261 DLS deg/100 Tool Face Length Curve ! ' 6 0 ~01 Curve 2 32 25 182 Curve 3 I0 90 320 Curve 4 I0 104 348 Curve 5 8 -90 459 Curve 6 10 90 574 Curve 7 10 0 35 Curve 8 10 90 999 2,937 Drawn: ######### 11:02 Plan Name: Case 122 I 1,500 8,640 J-24 J-24a Case 501 Oct. 18, 2000 Ted x4694 I I I 2,000 2,500 3,000 X distance from Sfc Loc 3,500 6,500 6,000 4,500 4,000 3,5~'"~ 4,000 IWell Name J-24 I CLOSURE Distance 5,422 fl Az 37 deg NEW HOLE E/W O0 Ni$ (Y) Kick Off 1,71 7 5,381 !1) 3,255 4,336 State Plane 646,800 5,975,107 Surface Loc 643,545 5,970,771 DLS deg/100 Tool Face Length Curve I 6 0 20 Curve 2 32 25 182 Curve 3 10 90 320 Curve 4 10 ! 04 348 Curve 5 8 -90 459 Curve 6 10 90 574 Curve 7 10 0 35 Curve 8 10 90 999 2,937 Drawn: ######### 11:02 Plan Name: Case 122 2 3/8" CT Lubricator RECEIVED DEC 1 9 2000 Alaska Oil & Gas Cons. Commission Anchorage J-24a CT Drilling & Completion BOP 22.5" 1 a" 38" Blind/Shear 71/16" Pipe/Slip 7 1/16" x 5,000 7 1/16' Slips 71/16" Pipe 7 1/16' x 5,000 psi 3/8" 2 718" 2 3/8" SWAB OR MASTER VALVE H 179].76; VENOOR ALASKASTAT 10 DATE INVOICE I CREDIT MEMO DESCRIPTION GROS~ DISCOUNT ' NET 113000 CKl130009 100. O0 100. O0 PYMT (:OMMENTS' Pe~mlit To D~ill l'ee HANDL] NG INST' S/H - Teeeie X4~,28 HE ATTACHED CHECK IS IN PAYMENT ~ ~ DE~CmB~ ABOVE. ~ 100. O0 100. O0 ANCHORA,I~E ' ,. '.,AK"' '~g'501:.'.' u'~,?q&?Bum m:Oh~.i~O=~sqSm-' 0081,~.~.qum WELL PERMIT CHECKLIST COMPANY FIELD & POOL ~~ INIT CLASS WELL NAME. ADMINISTRATION APPR DATE 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available-in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can.be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING DATE .. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. · 27. 28. 29. 30. 31. 32. 33. 34. Conductor string provided ................... Surface casing protects all known USDWs ........... CMT vol adequate to circulate on conductor & surf csg ..... CMT vol adequate to tie-in long stdng to surf csg ......... CMT will cover all known productive horizons .......... GEOLOGY. APPR DATE ~) I Z , Z l-., .cO LNNULAR DISPOSAL35. With proper cementing records, this plan APPR. DATE PROGRAM: exp ~ dev ~ redrll serv wellbore seg ...__ann. disposal para req GEOL AREA ~~__.~_~ UNIT# ~_.~<z_~Z~~ ON/OFF SHORE N. )N )N N N N N Y Casing designs adequate for C, T, B & permafrost ....... N ~.%,~. ' Adequate tankage or reserve pit ................. If a re-drill, has a 10-403 for abandonment been approved... N Adequate wellbore separation proposed .............. N ~,~.~¢~._ ~O~ ? _t-~,,~__~l~.~.~,e~.~-, ~_Tt,~,L~C~~'~'~,~ ,,~,3~.~\ ~,~',~\~'~ If diverter required, does it meet regulations .......... '~l~t'. ' ' Drilling fluid program schematic & equip list adequate ..... ~ N.. BOPEs, do they meet regulation ........ .__. ,-, ..... DY,~ N ~ _ _-.. ~ ~ _% ~ t~,_,,. ~ ~ . . Workwil,(~hO°PkE` oiccurwithou~ operation Si;utdown ...... Is presence of H2S gas probable ...... :: :.::::: :. : Y ~ ~:~'~'~:~'"~¥'~'~, ~tTW'~% ' ~"~ ~":"='~'"~"~"~'J {[-'c'q'~cJ<'t'~""~'~'~ ~"~' Data presented on potential overpressure zones ...... '. , ~f,,"l~ . v u · - Seismic analysis'of shallow gas zones ......... ' .... ~ .~P(~ Y .N . ' . Seabed condition survey (if off-Shore) ......... '../'- Y N . Contact name/phone for weekly progress reports [expl~13~tonZ..only] .Y N . Y N COMMISSION: J ~ (A) will contain waste in a suitable receiving zonei ........ (B) will not contaminate freshwater; or cause drilling waste.... to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) .will not damage producing formation or impair recovery from a pool; and will not circumvent 20 AAC 25.252 or 20 AAC 25.412. ENGINEERING: . UIC~A_nnular GEOLOGY: Y N Y N Y N Y N __! Commentsllnstructions: Z -!- c:~nsoffice\wordian~iana\checklist (rev. 1il01//00) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history' file. To improve {he readability of the Well History file and to simplify finding information, informati;3n of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically · organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Tue Aug 27 10:04:11 2002 Reel Header Service name ............. LISTPE Date ..................... 02/08/27 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 02/08/27 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD J-24A 500292168601 BP Exploration (Alaska), Inc. Sperry Sun 27-AUG-02 MWD RUN 13 MWD RUN 14 MWD RUN 15 AK-MW-10027 AK-MW-i0027 AK-MW-10027 B. JAHN B. JAHN S. LATZ SEVCIK / GOO SEVCIK / GOO SEVCIK / GOO 9 lin 13E 583 803 79.22 .00 .00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13,375 2701.0 2ND STRING 9.625 10843.0 3RD STRING 7.000 10863.0 PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 13 - 15 ARE DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 3. GAMMA RAY (SGRD) LOGGED BEHIND CASING FROM 10857' MD, 8541' SSTVD TO 10863' MD, 8543' SSTVD. 4. DIGITAL DATA ONLY IS DEPTH CORRECTED TO THE PDC GAMMA RAY LOG OF 02/23/01 (MNCL) WITH KBE = 79.2' A.M.S.L.. THIS WELL KICKS OFF FROM J-24 AT 10863' MD, 8543' SSTVD (TOP OF WHIPSTOCK) ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL DRILLER'S DEPTH REFERENCES. MWD RUNS 13 - 15 REPRESENT WELL J-24A WITH API # 50-029-21686-01. THIS WELL REACHED A TOTAL DEPTH OF 13728' MD, 8611' SSTVD. SROP = SMOOTHED RATE OF PENETRATION SGRD = SMOOTHED GAMMA RAY $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10859.5 13704.5 RO? 10884.5 13731.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 10859.5 10856.5 10860.5 10857.5 10913.5 10909.0 10935.0 10929.5 10945.5 10940.0 10984.0 10977.5 10997.0 10988.5 11009.0 11000.5 11610.5 11003.0 11013.0 11004.0 11017.0 11007.5 11020.0 11010.5 11025.0 11015.5 11032.5 11025.5 11035.5 11029.5 11037.5 11031.5 11054.0 11053.5 11056.5 11056.0 11068.5 11066.5 11072.0 11071.0 11096.5 11095.5 11111.5 11110.0 11126.0 11126.0 11128.5 11128.0 11158.5 11160.5 11173.5 11173.5 11180.5 11179.5 EQUIVALENT UNSHIFTED DEPTH 11185.5 11193.0 11249.5 11261.0 11268.5 11272.5 11275.5 11279.5 11352.5 11381.5 11391.0 11396.5 11408.5 12114.5 12134.0 12421.5 12429.0 12475.5 12483.5 12505.5 12508.0 12514.5 12549.0 12554.5 12556.0 12564.0 12578.0 12584.5 12593.0 12626.0 12630.0 12639.5 12644.5 12679.5 12689.5 1.2691.0 12696.0 12702.5 12802.0 12809 0 12858 0 12879 0 12891 5 12893 5 12921 5 12928 0 12947 0 12950.0 12979.5 12981.5 12995.0 13008.5 13731.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REMARKS: 11184.5 11192.5 11249.0 11260.5 11267.5 11274.5 11278.5 11282.0 11349.5 11379.5 11389.0 11394.5 11407.0 12110.5 12130.0 12416.5 12424.0 12472.5 12481.5 12501.5 12504.5 12508.5 12545.5 12551.0 12554.0 12560.5 12575.0 12582.0 12591.5 12624.5 12628.5 12638.0 12643.5 12678.5 12688.5 12690.5 12696.0 12702.0 12800.5 12807.0 12856.5 12878.0 12890.0 12891.5 12920.0 12926.0 12945.0 12948.5 12978.5 12980.0 12993.0 13005.5 13728.0 BIT RUN NO MERGE TOP MERGE BASE 13 10856.5 11059.0 14 11059.5 13337.0 15 13337.5 13728.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 10859.5 13731 12295.3 5744 ROP MWD FT/H 0.75 462.44 106.044 5694 GR MWD API 55.92 895.04 116.491 5691 First Reading For Entire File .......... 10859.5 Last Reading For Entire File ........... 13731 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 First Reading 10859.5 10884.5 10859.5 Last Reading 13731 13731 13704.5 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10856.5 11032.5 ROP 10881.0 11059.0 LOG HEADER DATA DATE LOGGED: 28-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 1.22 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11059.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 49.5 MAXIMUM ANGLE: 90.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP $ NATURAL GAMMA PROBE TOOL NUMBER 017 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 3.750 BOREHOLE CONDITIONS MUD TYPE: Flo-Pro MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (S): .0 MUD PM: 10.5 MUD CHLORIDES (PPM): 95000 FLUID LOSS (C3): 7.5 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD130 FT/H 4 1 68 4 2 GR MWD130 API 4 i 68 8 3 .0 145.9 .0 .0 Name Service Unit Min Max Mean Nsam DEPT PT 10856.5 11059 10957.8 406 ROP MWD130 FT/H 0.99 462.44 36.0989 357 GR MWD130 API 55.92 724.29 123.222 353 First Reading For Entire File .......... 10856.5 Last Reading For Entire File ........... 11059 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 First Reading 10856.5 10881 10856.5 Last Reading 11059 11059 11032.5 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 14 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11033.0 13313.0 ROP 11059.5 13337.0 $ LOG HEADER DATA DATE LOGGED: 31-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 1.22 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13337.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 85.2 MAXIMUM ANGLE: 101.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP NATURAL GAMMA PROBE 017 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.750 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: Flo-Pro MUD DENSITY (LB/G): 9.25 MUD VISCOSITY (S): 65.0 MUD PH: 8.8 MUD CHLORIDES (PPM): 93500 FLUID LOSS (C3): 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 171.0 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEFT FT 4 1 68 0 1 RO? MWD140 FT/H 4 1 68 4 2 GR MWD140 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DE?T FT 11033 13337 12185 4609 RO? MWD140 FT/H 2.84 291.65 106.567 4556 GR MWD140 API 57.51 895.04 120.586 4561 First Reading For Entire File .......... 11033 Last Reading For Entire File ........... 13337 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 First Reading 11033 11059.5 11033 Last Reading 13337 13337 13313 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 15 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13313.5 13701.5 ROP 13337.5 13728.0 LOG HEADER DATA DATE LOGGED: 02-FEB-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 1.22 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13728.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 86.5 MAXIMUM ANGLE: 94.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP NATURAL GAMMA PROBE 002 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 3.75C BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 9.20 MUD VISCOSITY (S): 62.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 95000 FLUID LOSS (C3): 5.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD150 FT/H 4 1 68 4 2 GR MWD150 API 4 1 68 8 3 .0 167.0 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 13313.5 13728 13520.8 830 ROP MWD150 FT/H 0.75 459.49 134.824 782 GR MWD150 API 60.82 520.43 88.9071 777 First Reading For Entire File .......... 13313.5 Last Reading For Entire File ........... 13728 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 First Reading 13313.5 13337.5 13313.5 Last Reading 13728 13728 13701.5 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 02/08/27 Origin ......... , .......... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 02/08/27 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LlsLlb SRevision: 4 $ Tue Aug 27 12:05:23 2002 Reel Header Service name ............. LISTPE Date ..................... 02/08/27 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 02/08/27 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD J-24APB1 500292168670 BP Exploration (Alaska), Inc. Sperry Sun 22-AUG-02 MWD RUN 1 MWD RUN 2 MWD RUN 8 AK-MW-10027 AK-MW-10027 AK-MW-10027 S. LATZ S. LATZ S. LATZ WHITLOW/HILD WHITLOW/HILD WHITLOW/HILD 9 lin 13E 583 803 79.22 .00 .00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2701.0 2ND STRING 9.625 10843.0 3RD STRING 7.000 10863.0 PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. MWD RUNS 1 & 8 ARE DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4). 4. MWD RUN 3 - 7 NO FOOTAGE DRILLED AND ARE NOT PRESENTED. 5. GAMMA RAY (SGRD) LOGGED BEHIND CASING FROM 10850' MD, 8535' SSTVD TO 10863' MD, 8543' SSTVD. 6. ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4) DATA FROM 10853' MD, 8538' SSTVD TO 11030' MD, 8622' SSTVD WAS OBTAINED ON A MADPASS WHILE RUNNING IN THE HOLE BEFORE DRILLING MWD RUN 2. THIS WAS DONE TO OBTAIN RESISTIVITY DATA OVER THE INTERVAL DRILLED ON MWD RUN 1. 7. DIGITAL DATA ONLY IS TIED INTO THE PDC GAMMA RAY LOG OF 02/03/01 (MNCL) WITH KBE = 79.2' A.M.S.L.. WELL J-24APB1 IS TIED INTO J-24 AT THE KICK OFF POINT. THIS WELL KICKS OFF FROM J-24 AT 10863' MD, 8543' SSTVD (TOP OF WHIPSTOCK) ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL DRILLER'S DEPTH REFERENCES. 8. MWD RUNS 1, 2, & 8 REPRESENT WELL J-24APB1 WITH API # 50-029-21686-70. THIS WELL REACHED A TOTAL DEPTH OF 11900' MD, 8589' SSTVD. SROP = SMOOTHED RATE OF PENETRATION SGRD = SMOOTHED GAMMA RAY SGRC = SMOOTHED GAMMA RAY COMBINED SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( EXTRA SHALLOW SPACING ) SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( SHALLOW SPACING ) SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( MEDIUM SPACING ) SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( DEEP SPACING ) SFXE = SMOOTHED FORMATION EXPOSURE TIME $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10851.0 11872.0 FET 10854.5 11716.5 RPD 10854.5 11716.5 RPM 10854.5 11716.5 RPS 10854.5 11716.5 RPX 10854.5 11716.5 ROP 10881,5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) 11901.5 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 10851,0 10849,5 10854,0 10852,5 10861.0 10859.5 11901,5 11900.0 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MWD 1 10849.5 MWD 2 11065,5 MWD 8 11750,5 $ REMARKS: MERGED MAIN PASS, $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 ,liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type,,,0 MERGE BASE 11065.0 11750,0 11900,0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 6.8 24 7 FET MWD HR 4 1 68 28 8 Name Service Unit Min Max DEPT FT 10851 11901,5 ROP MWD FT/H 0,31 3299,73 GR MWD API 44,84 653.82 RPX MWD OHMM 0,17 1855,7 RPS MWD OHMM 0,25 2000 RPM MWD OHMM 0,12 1881,09 RPD MWD OHMM 0,13 2000 FET MWD HR 0,36 14,33 Mean 11376.3 85.1394 110.08 18.8959 31.4316 24.0108 34.3118 3.50652 First Reading For Entire File .......... 10851 Last Reading For Entire File ........... 11901,5 File Trailer Service name ............. STSLIB,001 Service Sub Level Name,,, Version Number ........... 1,0,0 Date of Generation ....... 02/08/27 Maximum Physical Record,,65535 File Type ................ LO Next File Name ........... STSLIB,002 Nsam 2102 2041 2043 1725 1725 1725 1725 1725 First Reading 10851 10881,5 10851 10854,5 10854,5 10854,5 10854,5 10854,5 Last Reading 11901,5 11901,5 11872 11716,5 11716,5 11716,5 11716,5 11716,5 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10849.5 11033.0 ROP 10880.0 11065.0 $ LOG HEADER DATA DATE LOGGED: 18-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 1.22 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11065.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 47.1 MAXIMUM ANGLE: 89.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP NATURAL GAMMA PROBE 035 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.750 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.65 MUD VISCOSITY (S): 65.0 MUD PH: 9,0 MUD CHLORIDES (PPM): 26000 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 142.0 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 10849.5 11065 10957.3 432 ROP MWD010 FT/H 0.31 707.55 65.7846 371 GR MWD010 API 44.84 653.82 121.469 368 First Reading For Entire File .......... 10849.5 Last Reading For Entire File ........... 11065 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 First Reading 10849.5 10880 10849.5 Last Reading 11065 11065 11033 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 10853.0 11715.0 RPD 10853.0 11715.0 RPM 10853.0 11715.0 RPS 10853.0 11715.0 RPX 10853.0 11715.0 GR 11033.5 11704.0 ROP 11065.5 11750.0 $ LOG HEADER DATA DATE LOGGED: 19-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11750.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 88.3 97.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 126590 EWR4 ELECTROMAG. RESIS. 4 PB01743RF3 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 3.750 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 65.00 MUD VISCOSITY (S): 65.0 MUD PH: '9.0 MUD CHLORIDES (PPM): 26000 FLUID LOSS (C3): 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .200 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .140 MUD CAKE AT MT: .170 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lIN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 ROP MWD020 FT/H 4 1 68 GR MWD020 API 4 1 68 RPX MWD020 OHMM 4 1 68 RPS MWD020 OHMM 4 1 68 RPM MWD020 OHMM 4 1, 68 RPD MWD020 OHMM 4 1 68 FET MWD020 HR 4 1 68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 65.0 150.0 65.0 65.0 Name Service Unit Min Max DEPT FT 10853 11750 ROP MWD020 FT/H 0.45 3299.73 GR MWD020 API 56.52 537.06 RPX MWD020 OHMM 0.17 1855.7 RPS MWD020 OHMM 0.25 2000 RPM MWD020 OHMM 0.12 1881.09 RPD MWD020 OHMM 0.13 2000 FET MWD020 HR 0.36 14.33 Mean 11301.5 84.2906 116.262 18.8959 31.4316 24.0108 34.3118 3.50652 Nsam 1795 1370 1342 1725 1725 1725 1725 1725 First Reading 10853 11065.5 11033.5 10853 10853 10853 10853 10853 Last Reading 11750 11750 11704 11715 11715 11715 11715 11715 First Reading For Entire File .......... 10853 Last Reading For Entire File ........... 11750 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11704.5 11870.5 ROP 11750.5 11900.0 $ LOG HEADER DATA DATE LOGGED: 22-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 1.22 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11900.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 87.5 MAXIMUM ANGLE: 90.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP NATURAL GAMMA PROBE 035 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.750 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.70 MUD VISCOSITY (S): 65.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 26 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 150.0 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RO? MWD080 FT/H 4 1 68 4 2 SR MWD080 API 4 1 68 8 3 .0 Name Service Unit Min Max Mean Nsam DEPT FT 11704.5 11900 11802.3 392 ROP MWD080 FT/H 20.6 2319.59 112.951 300 GR MWD080 API 59.4 82.14 72.5788 333 First Reading For Entire File .......... 11704.5 Last Reading For Entire File ........... 11900 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/27 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 First Last Reading Reading 11704.5 11900 11750.5 11900 11704.5 11870.5 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 02/08/27 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 02/08/27 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Thu Aug 29 10:41:35 2002 Reel Header Service name ............. LISTPE Date ..................... 02/08/29 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 02/08/29 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MW-10027 S. LATZ WHITLOW/HILD J-24APB2 500292168671 BP Exploration (Alaska), Inc. Sperry Sun 29-AUG-02 MWD RUN 2 MWD RUN 8 AK-MW-10027 AK-MW-10027 S. LATZ S. LATZ WHITLOW/HILD WHITLOW/HILD JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 9 MWD RUN 10 MWD RUN 11 AK-MW-10027 AK-MW-10027 AK-MW-10027 S. LATZ B. JAHN B. JAHN WHITLOW/HILD SEVCIK / GOO SEVCIK / GOO 9 liN 13E 583 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 803 79.22 .00 .00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.375 2701.0 9.625 10843.0 7.000 10863.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1, 8, 9, & 11 ARE DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 3. MWD RUNS 2 & 10 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4). 4. GAMMA RAY (SGRD) LOGGED BEHIND CASING FROM 10850' MD, 8535' SSTVD TO 10863' MD, 8543' SSTVD. 5. THE GAP IN SROP FROM 11071' MD, 8620' SSTVD TO 11120' MD, 8614' SSTVD AND THE GAP IN GAMMA RAY (SGRD) FROM 11071' MD, 8620' SSTVD TO 11089' MD, 8618' SSTVD IS DUE TO INADVERTANT OPEN HOLE SIDETRACK. ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4) DATA FROM 10853' MD, 8538' SSTVD TO 11030' MD, 8622' SSTVD WAS OBTAINED ON A MADPASS WHILE RUNNING IN THE HOLE BEFORE DRILLING MWD RUN 2. THIS WAS DONE TO OBTAIN RESISTIVITY DATA OVER THE INTERVAL DRILLED ON MWD RUN 1. 7. ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4) NOT LOGGED FROM 11071' MD, 8620' SSTVD TO 11171' MD, 8604' SSTVD. 8. ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4) DATA FROM 11171' MD, 8604' SSTVD TO 12165' MD, 8606' SSTVD WAS OBTAINED ON A MADPASS WHILE RUNNING IN THE HOLE BEFORE DRILLING MWD RUN 10. THIS WAS DONE TO OBTAIN RESISTIVITY DATA OVER THE INTERVAL DRILLED ON MWD RUN 9. 9. DIGITAL DATA ONLY IS TIED INTO THE PDC GAMMA RAY LOG OF 02/03/01 (MNCL) WITH KBE = 79.2' A.M.S.L.. WELL J-24APB2 IS TIED INTO J-24 AT THE KICK OFF POINT. WELL J-24APB2 IS TIED INTO J-24APB1 AT THE KICK OFF POINT. THIS WELL KICKS OFF FROM J-24 AT 10863' MD, 8543' SSTVD (TOP OF WHIPSTOCK) THIS WELL KICKS OFF FROM J-24APB1 AT 11071' MD, 8620' SSTVD ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL DRILLER'S DEPTH REFERENCES. 10. MWD RUNS 1, 2, & 8 - 11 REPRESENT WELL J-24APB2 WITH API# 50-029-21686-71 THIS WELL REACHED A TOTAL DEPTH OF 12975' MD, 8618' SSTVD. SROP = SMOOTHED RATE OF PENETRATION SGRD = SMOOTHED GAMMA RAY SGRC = SMOOTHED GAMMA RAY COMBINED SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( EXTRA SHALLOW SPACING ) SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( SHALLOW SPACING ) SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( MEDIUM SPACING ) SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( DEEP SPACING ) SFXE = SMOOTHED FORMATION EXPOSURE TIME File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.O00 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10851.0 12951.0 FET 10854.5 12781.5 RPD 10854.5 12781.5 RPM 10854.5 12781.5 RPS 10854.5 12781.5 RPX 10854.5 12781.5 ROP 10881.5 12975.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH MERGE TOP 10849.5 11065.5 11071.5 11168.5 12200.5 12817.5 BASELINE DEPTH GR 10851.0 10849.5 10854.0 10852.5 10861.0 10859.5 11072.5 11071.0 11075.0 11075.0 12975.0 12975.0 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 1 MWD 2 MWD 8 MWD 9 MWD 10 MWD 11 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 11065 0 11071 0 11168 0 12200 0 12817 0 12975 0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HR 4 1 68 2O 24 28 Name Service Unit Min Max DEPT FT 10851 12975 ROP MWD FT/H 0.31 3299.73 GR MWD API 44.84 833.64 RPX MWD OHMM 0.17 1855.7 RPS MWD OHMM 0.25 2000 R?M MWD OHMM 0.12 2000 RPD MWD OHMM 0.13 2000 FET MWD HR 0.3427 70.5539 First Reading For Entire File .......... 10851 Last Reading For Entire File ........... 12975 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Mean 11913 83.4089 96.4234 12.7404 20.9466 17. 6163 21.4446 19.2479 Nsam 4249 4092 4166 3656 3656 3656 3656 3656 First Reading 10851 10881.5 10851 10854.5 10854.5 10854.5 10854.5 10854.5 Last Reading 12975 12975 12951 12781.5 12781.5 12781.5 12781.5 12781.5 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLiB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10849.5 11033.0 ROP 10880.0 11065.0 $ LOG HEADER DATA DATE LOGGED: 18-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 1.22 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11065.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 47.1 MAXIMUM ANGLE: 89.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP NATURAL GAMMA PROBE 035 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 3.750 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.65 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 26000 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 .0 142.0 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 10849.5 11065 10957.3 432 ROP MWD010 FT/H 0.31 707.55 65.7846 371 GR MWD010 API 44.84 653.82 121.469 368 First Reading 10849.5 10880 10849.5 Last Reading 11065 11065 11033 First Reading For Entire File .......... 10849.5 Last Reading For Entire File ........... 11065 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPM 10853.0 11071.0 RPD 10853.0 11071.0 RPS 10853.0 11071.0 RPX 10853.0 11071.0 FET 10853.0 11071.0 GR 11033.5 11071.0 ROP 11065.5 11071.0 $ LOG HEADER DATA DATE LOGGED: 19-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11071.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 88.3 MAXIMUM ANGLE: 97.1 TOOL STRING (TQP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB01743RF3 EWR4 ELECTROMAG. RESIS. 4 PB01743RF3 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 3.750 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 65.00 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 26000 FLUID LOSS (C3): 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .200 MUD AT MAX CIRCULATING TERMPERATURE: .092 MUD FILTRATE AT MT: .140 MUD CAKE AT MT: .170 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record 65.0 150.0 65.0 65.0 Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order DEPT FT 4 1 68 ROP MWD020 FT/H 4 1 68 GR MWD020 API 4 1 68 RPX MWD020 OHMM 4 1 68 RPS MWD020 OHMM 4 1 68 RPM MWD020 OHMM 4 1 68 RPD MWD020 OHMM 4 1 68 FET MWD020 HR 4 1 68 Units Size Nsam Rep Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 10853 11071 ROP MWD020 FT/H 61.64 3299.73 GR MWD020 API 141.86 261.21 RPX MWD020 OHMM 0.17 1855.7 RPS MWD020 OHMM 0.25 2000 RPM MWD020 OHMM 0.12 1881.09 RPD MWD020 OHMnH 0.13 2000 FET MWD020 HR 0.96 14.33 Mean 10962 1207.65 186.536 22.2745 66.171 31.7842 56.1553 10.771 Nsam 437 12 76 437 437 437 437 437 First Reading 10853 11065.5 11033.5 10853 10853 10853 10853 10853 Last Reading 11071 11071 11071 11071 11071 11071 11071 11071 First Reading For Entire File .......... 10853 Last Reading For Entire File ........... 11071 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11089.0 11141.5 ROP 11119.5 11168.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 22-JAN-01 Insite 4.05.5 1.22 Memory 11168.0 87.5 90.2 TOOL NUMBER O35 3.750 BOREHOLE CONDITIONS MUD TYPE: F10 Pro MUD DENSITY (LB/G): 8.70 MUD VISCOSITY (S): 65.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 26 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 .0 150.0 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD080 FT/H 4 1 68 4 2 GR MWD080 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 11089 11168 11128.5 159 ROP MWD080 FT/H 5.36 331.34 72.5381 98 GR MWD080 API 97.14 284.11 142.489 106 First Reading 11089 11119.5 11089 Last Reading 11168 11168 11141.5 First Reading For Entire File .......... 11089 Last Reading For Entire File ........... 11168 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11142.0 12174.0 ROP 11168.5 12200.0 $ LOG HEADER DATA DATE LOGGED: 22-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 1.22 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 12200.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 86.8 MAXIMUM ANGLE: 102.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP NATURAL GAMMA PROBE 002 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.750 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.70 MUD VISCOSITY (S): .0 MUD PH: 8.5 MUD CHLORIDES (PPM): 42 FLUID LOSS (C3): 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 158.0 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD090 FT/H 4 1 68 4 2 GR MWD090 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 11142 12200 11671 2117 ROP MWD090 FT/H 3.66 951.97 79.0237 2064 GR MWD090 API 55.39 833.64 81.0133 2065 First Reading For Entire File .......... 11142 Last Reading For Entire File ........... 12200 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 First Reading 11142 11168.5 11142 Last Reading 12200 12200 12174 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET 11171.0 RPD 11171.0 RPM 11171.0 STOP DEPTH 12781.5 12781.5 12781.5 RPS 11171.0 RPX 11171.0 GR 12174.5 ROP 12200.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 12781.5 12781.5 12770.5 12817.0 25-JAN-01 Insite 4.05.5 4.3 Memory 12817.0 84.3 92.1 TOOL NUMBER PBO1818RF3 PBO1818RF3 3.750 BOREHOLE CONDITIONS MUD TYPE: FLO-PRO MUD DENSITY (LB/G): 9.20 MUD VISCOSITY (S): .0 MUD PH: 8.5 MUD CHLORIDES (PPM): 90000 FLUID LOSS (C3): 7.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .055 MUD AT MAX CIRCULATING TERMPERATURE: .025 MUD FILTRATE AT MT: .050 MUD CAKE AT MT: .060 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 ROP MWD100 FT/H 4 1 68 GR MWD100 API 4 1 68 RPX MWD100 OHMM 4 1 68 RPS MWD100 OHMM 4 i 68 RPM MWD100 OHMM 4 1 68 RPD MWD100 OHMM 4 1 68 FET MWD100 HR 4 1 68 0 1 4 2 8 3 ,12 4 16 5 20 6 24 7 28 8 70.0 162.0 70.0 70.0 Name Service Unit Min Max DEPT FT 11171 12817 ROP MWD100 FT/H 17.98 195.07 GR MWDiO0 API 57.58 479.39 RPX MWD100 OHMM 2.94 64.95 RPS MWD100 OHMM 3.6 2000 RPM MWD100 OHMM 3.93 2000 RPD MWDi00 OHMM 5.89 2000 FET MWD100 HR 0.3427 70.5539 First Reading For Entire File .......... 11171 Last Reading For Entire File ........... 12817 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Mean 11994 90.8229 111.073 11.4445 14.8035 15.6892 16.7288 20.3806 Nsam 3293 1234 1193 3222 3222 3222 3222 3222 First Reading 11171 12200.5 12174.5 11171 11171 11171 11171 11171 Last Reading 12817 12817 12770.5 12781.5 12781.5 12781.5 12781.5 12781.5 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ........... ~ .... LO Previous File Name ........ STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12771.0 12951.0 ROP 12817.5 12975.0 $ LOG HEADER DATA DATE LOGGED: 26-JAN-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 1.22 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 12975.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 93.4 MAXIMUM ANGLE: 93.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP $ NATURAL GAMMA PROBE BOREHOLE AND CASING DATA TOOL NUMBER 017 OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 3.750 BOREHOLE CONDITIONS MUD TYPE: FLO PRO MUD DENSITY (LB/G): 9.25 MUD VISCOSITY (S): .0 MUD PH: 8.5 MUD CHLORIDES (PPM): 90000 FLUID LOSS (C3): 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame SDacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWDll0 FT/H 4 1 68 4 2 GR MWDll0 API 4 1 68 8 3 .0 167.0 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 12771 12975 12873 409 ROP MWDll0 FT/H 14.61 108.65 73.8874 316 GR MWDll0 API 68.34 97.6 78.644 361, First Reading 12771 12817.5 12771 Last Reading 12975 12975 12951 First Reading For Entire File .......... 12771 Last Reading For Entire File ........... 12975 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/08/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 02/08/29 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 02/08/29 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File