Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
213-090
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 11-28B LTP Squeeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-090 50-029-21958-02-00 14733 Surface Intermediate Liner Liner Liner 8767 4293 5245 6497 799 37 14692 13-3/8" 9-5/8" 7" 4-1/2" 2-3/8" 8768 30 - 4327 28 - 5273 5098 - 11595 11411 - 12210 14693 - 14730 30 - 3503 28 - 4101 3990 - 8279 8152 - 8717 8768 - 8767 14015 (3) , 14432 2260 4760 7020 7500 11780 none 5020 6870 8160 8430 11200 12255 - 14690 3-1/2" 13Cr80 x L-80 25 - 11414 8749 - 8768 Conductor 80 20" 31 - 111 31 - 111 1490 470 4-1/2" Baker S-3 Perm , 11239 , 8033 No SSSV 11239 , 11282 8033 , 8061 Bo York Operations Manager Dave Wages David.Wages@hilcorp.com (907) 564-5006 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028325 25 - 8154 LTP at 11260' MD Coil Squeezed 20bbls of 15.8ppg Class G Cement @ final 2000 psi 83 196 11383 7150 2957 1268 1547 1634 703 242 324-478 13b. Pools active after work:PRUDHOE OIL 3-1/2" Baker 35 KB , 11282 , 8061 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 9:01 am, Nov 05, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.11.04 14:51:13 - 09'00' Bo York (1248) DSR-11/6/24WCB 2-10-2025 RBDMS JSB 061125 ACTIVITYDATE SUMMARY 10/6/2024 CTU#1 1.5" CT Job Scope: Sqz Liner LapPerform Injectivity Tests. MIRU CTU. Pump 1" Drift Ball and Perform Weekly BOP Test. Bullhead 155 bbls 1% Slick KCL w/ Safelube. RIH w/ 1.75" DJN Drift BHA. Perform Injectivity Tests. 2.5 bpm @ 75psi, 2 bpm @ 25psi, 1 bpm & 0.5 bpm @ 0psi. ***In Progress*** 10/7/2024 CTU#1 1.5" CT Job Scope: Sqz Liner Lap Continue RIH w/ 1.75" DJN. Tag at 14049' and got weight back. Tag at 14051' and got weight back. Appear to be pushing debris (potentially old Kb Pkr slips). Flag pipe 50' from weight back. Jet diesel in liner. Pooh keeping the hole full. MU HES Logging tools with GR/CCL and RIH. Log from 12500' up to 11100', painting white tie- in flag at 11830'. POOH. Confirm +10' correction. Make up 2-3/8" NS Mill EZ CBP and RIH. Confirm Injectivity pre-set 1.0 bpm at 80 psi, 2.0 bpm at 475 psi, and 3.0 bpm at 965 psi. Tie-in to flag and set with top at 11900'. Set down 3k to confirm plug set. Perform injectivity test post-set of 0.4 bpm at 840 psi and 0.5 bpm at 1070 psi. POOH maintaining hole fill to prevent gas migration. RIH w/ 1.50" BDJSN (slim bha). Tag CBP and correct nozzle to 11900'. Puh above LTP. Circulate in diesel underbalance. ***In Progress*** 10/8/2024 CTU#1 1.5" CT. Job Scope: Sqz Liner Lap Finish circulating diesel underbalance. Pre Acid Injectivity: 0.4 bpm @ 1160psi, 0.5 bpm @ 1280psi, 0.8 bpm @ 1500psi. Circulate in 15.5 bbls 15% HCl. Displace with diesel. Once Acid at nozzle, close choke and inject acid behind Liner. Hesitate for 15 mins after every 5 bbls pumped behind liner. Post Acid Injectivity: 0.5 bpm @ 685psi, 0.8 bpm @ 880psi. Lay in powervis from the CBP at 11900' up to the liner top at 11275'. Park at 11260' and pump 20 bbls of 15.8 ppg class G cement into the coil. Inject cement into the liner lap with the choke closed. After 8 bbls behind the liner lap, able to achieve a 2000 psi squeeze (above static WHP) for 15 mins. Lay in remaining cement 1:1 and then jet into it with Powervis to contaminate. Jet down to the CBP with powervis and then chase out of hole jetting all jewelry and GLMs with multiple passes. Swab ckeck. Jet Stack. Break off. Capture 5/8" ball. Cut CTC & Prep for Milling BHA. ......In Progress......... 10/9/2024 CTU#1 1.5" CT. Job Scope: Sqz Liner Lap RIH w/ Baker 1.69" Milling BHA w/ 1.75" Junk Mill. Pressure Test Sqz to 500psi - good. Rih taking displacement. Tag CBP at 11890, Mill and chase to 14432 CTMD. POOH. Freeze protect coil 33 bbls and well tubing with 35 bbls of diesel. RDMO. ......Job Complete.........SL to set a dream catcher prior to pop. 10/10/2024 ***WELL S/I ON ARRIVAL*** (Cement squeeze) RU POLLARD UNIT #60 ***CONTINUED ON 10/11/24 WSR*** Daily Report of Well Operations PBU 11-28B ) MU HESgg Logging tools with GR/CCL and RIH. Log from 12500' up to 11100', painting white tie-gg g g g in flag at 11830'. POOH. Confirm +10' correction. Make up 2-3/8" NS Mill EZ CBPg and RIH. Confirm Injectivity pre-set 1.0 bpm at 80 psi, 2.0 bpm at 475 psi, and 3.0jy bpm at 965 psi. Tie-in to flag and set with top at 11900'. Set down 3k to confirm plugg set. Perform injectivity test post-set of 0.4 bpm at 840 psi and 0.5 bpm at 1070 psi.jy POOH maintaining hole fill to prevent gas migration. RIH w/ 1.50" BDJSN (slim bha).ggg ( Tag CBP and correct nozzle to 11900'. Puh above LTP. Circulate in diesel @ Once Acid at nozzle, close choke and inject acid behind Liner. Hesitate for 15j mins after every 5 bbls pumped behind liner. Post Acid Injectivity: 0.5 bpm @ 685psi,y jy @ 0.8 bpm @ 880psi. Lay in powervis from the CBP at 11900' up to the liner top at 11275'. Park at 11260' and pump 20 bbls of 15.8 ppg class G cement into the coil. Inject cement into the liner lap with the choke closed. After 8 bbls behind the liner lap, able to achieve a 2000 psi squeeze (above static WHP) for 15 mins. Lay in remaining()y cement 1:1 and then jet into it with Powervis to contaminate. Jet down to the CBPj with powervis and then chase out of hole jetting all jewelry and GLMs with multiple passe Daily Report of Well Operations PBU 11-28B 10/11/2024 ***CONTINUED FROM 10/10/24 WSR*** (Cement squeeze) RAN 3 1/2" BLB & 2.80" GAUGE RING TO AT 5,825' SLM (Unable to work deeper) RAN 3 1/2" BLB & 2.75" GAUGE RING TO AT 5,891' SLM (Unable to work deeper, spangs jammed w/ metal shavings) RAN 2 1/2" SAMPLE BAILER TO LTP AT 11,282' MD RAN 3 1/2" BLB & 2.30" GAUGE RING TO LTP AT 11,282' MD (all clear) RAN 3-1/2" DREAMCATCHER TO OBSTRUCTION AT 7,067' SLM (unable to work past - tools stick - metal shavings in tools) B&F TBG W/ 3-1/2" BRUSH & 2.79" GAUGE RING TO LTP AT 11,282' MD (LRS pumped 100 bbls crude) MADE ATTEMPT TO SET 3-1/2" DREAMCATCHER IN X-NIP AT 11,264' MD & 11,216' MD (brought back - metal shavings in tools) SET 3-1/2" DREAMCATCHER IN SVLN AT 2,126' MD ***WELL S/I ON DEPARTURE*** 10/11/2024 T/I/O= 98/807/30 LRS Unit 76 Assist Slickline (CEMENT SQUEEZE) Pump 2 BBLS 60/40 followed by 100 BBLS Crude down the TBG as directed by Slickline. FWHP's 235/806/31 DSO notified of well status upon departure. 10/13/2024 T/I/O= 670/1952/42, (HOT OIL TBG WASH) Pumped 5 bbls 60/40 meth down TBG followed by 10.5 bbls 130* crude, TBG Locked up at 3000 psi, pumped 16 bbls 190* crude down IA, RD and RU to treecap per wellsite lead for FL FP. Pumped 5 bbls 60/40 meth and 170 bbls crude down FL. Swapped to TBG and pumped 6 bbls crude. Locked up TBG left 2800 psi on TBG. FWHP= 2800/1952/42 10/14/2024 ***WELL S/I ON ARRIVAL*** ATTEMPTED TO BLEED PRESSURE FROM TBG; FLOWING TO TANK @ 1550 PSI. RAN 3 1/2" GS; S/D HIGH @ 2008' SLM. JOB POSTPONED DUE TO HIGHER PRIORITY. ***WELL S/I ON DEPARTURE*** 10/15/2024 ***WELL S/I ON ARRIVAL*** RAN 10' x 2.5" PUMP BAILER TO DREAMCATCHER @ 2126' MD (BOBBLES FROM 2000'). PARAFFIN IN BAILER. RAN 3' x 1-7/8'' STEM, 2.75'' G-RING TO 2098' SLM, WORK DOWN TO TAG DREAMCAMCATCHER @ 2104' SLM BRUSHED w/ 3-1/2'' BLB, 2.80'' G-RING, BRUSHED ~2098; SLM, TAG DREAMCAMCATCHER @ 2104' SLM (covered in paraffin) ATTEMPTED TO PULL 3-1/2'' DREAMCATCHER FROM 2126' MD (no success, fighting paraffin) (gs full of paraffin, keys wont function) RAN 5' x 2.25'' DRIVE DOWN BAILER (msfb) TO 2104' SLM (~1 cup of paraffin) ATTEMPTED TO PULL 3-1/2'' DREAMCATCHER FROM 2126' MD (no success, fighting paraffin) (gr full of paraffin, keys wont function) RAN 3' x 1-7/8'' STEM, 2.85'' G-RING, @ 2104' SLM (no issues, paraffin on g-ring & in QCs) ***WSR CONT ON 10-16-24*** Daily Report of Well Operations PBU 11-28B 10/16/2024 ***WSR CONT FROM 10-15-24*** RAN 10' x 2.25'' PUMP BAILER (msfb) TO @ 2105' SLM (recovered ~4 cups tar / paraffin) PULLED 3-1/2'' DREAMCATHER, (packed full of paraffin). RAN KJ, 3' x 1-7/8'' STEM, 2.80'' G-RING TO 11,240' SLM. UNABLE TO WORK PAST. RAN 10' x 2.5" PUMP BAILER TO 11,240' SLM (EMPTY). BRUSHED & HOT FLUSHED TBG 2.80" TO 11,240' SLM. SET 3-1/2" DREAMCATCHER (33" OAL) IN X-NIP @ 11216' MD RAN 3-1/2" CHECK SET (sheared) ***WELL LEFT S/I ON DEPARTURE, NOTIFY DSO OF WELL STATUS*** 10/16/2024 T/I/O= 1903/1862/36 (HOT OIL TBG WASH) Assist SL - Brush & Flush: Pumped 20 bbls of 190* Crude down TBG to confirm flow. Pumped 120 bbls of 180* Diesel to assist SL with B&F. SL in control of well upon departure. FWHPs= 925/1811/85 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 11-28B LTP Squeeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-090 50-029-21958-02-00 ADL 0028325 14733 Surface Intermediate Liner Liner Liner 8767 4293 5245 6497 799 37 14692 13-3/8" 9-5/8" 7" 4-1/2" 2-3/8" 8768 30 - 4327 28 - 5273 5098 - 11595 11411 - 12210 14693 - 14730 2425 30 - 3503 28 - 4101 3990 - 8279 8152 - 8717 8768 - 8767 14015 2260 4760 7020 7500 11780 none 5020 6870 8160 8430 11200 12255 - 14690 3-1/2" 13Cr80 x L-80 25 - 114118749 - 8768 Conductor 80 20" 31 - 111 31 - 111 1490 470 4-1/2" Baker S-3 Perm , 11239 , 8033 No SSSV Date: Bo York Operations Manager Dave Wages David.Wages@hilcorp.com (907) 564-5006 PRUDHOE BAY 09-03-2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 3:06 pm, Aug 20, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.08.20 14:53:35 - 08'00' Bo York (1248) 324-478 10-404 2425 DSR-8/21/24MGR11SEP24SFD 8/20/2024*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.09.13 21:02:17 -04'00'09/13/24 RBDMS JSB 091724 LTP Squeeze 11-28B PTD:213090 Well Name:11-28B API Number:50-029-21958-00 Current Status:Offline Rig:Coil Estimated Start Date:Sept 2024 Estimated Duration:2days Regulatory Contact:Carrie Janowski Permit to Drill Number:213090 First Call Engineer:David Wages 713.380.9836 Second Call Engineer:David Bork 907.440.0331 AFE Number:IOR 94 Current Bottom Hole Pressure: 3295 psi @ 8,700’ TVD MASP: 2425 psi 0.1 psi/ft gas gradient Min ID:1.781” R Nip in PTSA at 11,301’md Max Angle:93 Deg @ 13441’md Last MIT-T:1500 psi on 12/26/2016 Last TIFL:5/14/2024 Brief Well Summary: 11-28B is a coiled tubing sidetrack drilled in 2013 in zone 1. In January 2024 water rate started picking up with oil starting to fall off. Current well rates are similar to flowing periods where the LTP was removed from the well. In May – August, slickline, braided line and coil attempted to recover the LTP without success. In leu of replacing the LTP, we will attempt to squeeze the LTP in place to shut off the large increase in water production. This work is expected to add 94 IOR and payout in 2 months. 9/2013: Post CTD, Slickline install LGLVs and set LTP, tested LTP to 2000 psi Fought scale issues early in well life, in Feb 2014, the water came in without any wellwork. Slickline went out and pushed something to the LTP then spent several days bailing scale until they could pump into the well. 6/22 and 6/23/2014 tests not accurate, something is off and no wellwork was performed at this time, was an initial test after a few months shut in. TIFLs passing 2/13/2015: coil mill/thaw ice plug, bottom at 11380, continue to drift to 13966’ at lockup. Set IBP @ 11,397’ (above all perfs) Establish LLR of 0.5 BPM @ 1300 psi 7/2014: Slickline pulled the LTP, still difficult to POP. Comments around this time report the well as difficult to keep or even get online. Unable to POP 9/2015: SL bailed LTP rubber and slips, pulled IBP IBP and LTP out of well. Set LTP 1/2016: SL Set plug in X @ 2126’, MIT-T, tree replaced, pulled plug 10/2016: B&F, set plug in LTP, MITs passed, pulled LTP 12/2016: Coil STP log then perf 13,370’ – 13,400’, 13,230’ – 13,260’, 13,190’ - 13,220’, slickline set LTP 1/2018: SL pull LTP, Coil venturi came back empty, perf 12,705’ – 12,736’, 12,673’ – 12,704’, 12,642’ – 12,673’, 12,592’ – 12,622’, 12,492’ – 12,522’, 12,462’ – 12,492’, 12,432’ – 12,462’ (7 intervals shot) POP w/o LTP to 1200 bwpd and reduced oil – similar to today’s numbers 2/2018: SL set LTP 2/2018: SIT treatment 8/2019: Eline attempt RBT, lost tools at LTP, slickline unable to fish 9/2019: Coil retrieve eline fish, ran CBL, TOC @ 11,880’ inside the motherbore liner 10/2019: Eline perf 12,255’ – 12,276’ 4/2021: Eline perf 12,302’ – 12,332’, left spent guns in hole, slickline able to fish out 5/2021: Eline perf 12,282’ – 13,302’ May – July 2024: Slickline/braided line/Coil: attempt to pull LTP without success Objective:The objective of this program is to squeeze the 2-3/8” annulus at the LTP area. LTP Squeeze 11-28B PTD:213090 LTP Squeeze 11-28B PTD:213090 Coil Tubing 1. MU and RIH with GR/CCL to set CBP in 2-3/8” liner 2. Pull tie in log from PBTD to ~11,100’ to capture the liner and all the lower tubing jewelry. 3. MU and RIH with CBP 4. Prior to setting CBP, obtain stable injectivity tests at 0.5, 1 and 2 BPM for 5 min each down the coil backside 5. Set CBP @ ~11,900’ a. Avoid higher doglegs at window (12,208’) and from 11,600’ – 11,800’ b. LTP @ 11,282’ c. Top perf @ 12,282’ 6. After setting CBP, obtain stable injectivity tests at 0.5, 1 and 2 BPM for 5 min each down the coil backside, compare with previous injectivity test. 7. If CBP passes a pressure test to 1000 psi, MU motor and mill and mill CBP and push to PBTD then RDMO 8. MU cementing nozzle for LTP squeeze 9. RIH to ~11,270’ and pump the following: a. If not already done so, load tubing/coil with diesel i. Tubing volume to LTP @ 11,282’: 99 bbls ii. 3-1/2” tubing x 2-3/8” liner annulus volume to 11414’: 0.5 bbls iii. 4-1/2” tubing x 2-3/8” liner annulus volume to window: 7.8 bbls iv. Total volume: 108 bbls fresh water minimum needed b. 15 bbls 15% HCl i. Include SLB recommended surfactants, iron control and clay stabilizers c. Displace acid with coil volume of diesel d. Every 5 bbls of acid past the LTP, hesitate to allow the acid to soak for ~15 min. e. After final hesitations, overflush acid away with 20 bbls freshwater 10. Mix up cement and squeeze LTP annulus: a. Freshwater spacer b. 20 bbls cement i. 15.8 ppg ii. 100-200 cc/30 min iii. YP: 30+ iv. Should have a long steady ramp to 500 psi compressive strength. The longer and flatter the ramp, the longer our window to get a good squeeze. c. Displace with diesel 11. Hesitation squeeze cement into deployment sleeve annulus 12. After a 15 min 2000 psi stable pressure is observed, use nozzle to wash up cement to CBP and circulate wellbore clean. 13. MU motor and mill for 2-3/8” CBP 14. RIH and mill up CBP and push to PBTD. 15. Freeze protect as needed and RDMO LTP Squeeze 11-28B PTD:213090 CBP Set tie in log: CBP Set @ 11,900’ LTP Squeeze 11-28B PTD:213090 Current WBD: LTP Squeeze 11-28B PTD:213090 Squeeze WBD: LTP Squeeze 11-28B PTD:213090 Proposed Final WBD: Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:213-090 6.50-029-21958-02-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 14733 14692 8768 11241 , 11370 14015 None 8033 , 8123 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80' 20" 31 - 111 31 - 111 1490 470 Surface 4292' 13-3/8" 30 - 4322 30 - 3503 5020 2260 Intermediate 5245' 9-5/8" 28 - 5273 28 - 4101 6870 4760 Production 6497' 7" 5098 - 11595 3990 - 8279 8160 7020 Perforation Depth: Measured depth: 12282 - 14690 feet True vertical depth:8765 - 8768 feet Tubing (size, grade, measured and true vertical depth)3-1/2" 9.2# 13Cr80 25 - 11414 25 - 8154 11241 , 11370 8033 , 8123Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S-3 (2) Liner 4232' 4-1/2" x 2-3/8" 11297 - 14730 8072 - 8767 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 4071996303385 35418848 2007 18568 436 407 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Torin Roschinger Torin.Roschinger@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907) 564-4887 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8767 Sundry Number or N/A if C.O. Exempt: n/a No SSSV Junk Packer Printed and Electronic Fracture Stimulation Data 5 Operations shutdown Change Approved Program Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 5Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028325 , 0028321 PBU 11-28B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 2:23 pm, Jun 10, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.06.10 14:00:23 -08'00' Bo York MGR30JUL2021 DSR-6/10/21 RBDMS HEW 6/11/2021 SFD 6/18/2021 , ADL 0028322 SFD 6/18/2021 ACTIVITYDATE SUMMARY 4/10/2021 ***WELL FLOWING ON ARRIVAL*** (perf) RAN 30' x 1.56" DUMMY GUNS (1.71" MAX OD) TO DEVIATION @ 12,413' SLM. (no issues) ***JOB COMPLETE, WELL FLOWING ON DEPARTURE*** 4/10/2021 Frezze Protect Tbg and FL for Slickline (PERFORATING) Freeze Protect CANCELLED. 4/21/2021 ***WELL ONLINE ON ARRIVAL, DSO NOTIFIED***(adperf) LOG CORRELATION PASS MULTIPLE TIMES TO GET AN AGREEABLE TIE IN. DIFFICULT TIE IN DUE TO POSSIBLE SCALE BUILD, TENSION SWINGS CAUSING "YO-YO" ON TOOL SENSORS AND OFF SCALE TIE IN LOG. TIE IN USING THE COLLAR AT 12302', 12334' ALONG W/ GAMMA PEAKS AT 12303' AND 12320'. PERFORATE 12302'-12332' USING 1.56"x30', 6 SPF, 60 DEGREE PHASING HSC LOADED W/ 3.5GR PERFECTA CHARGES. CCL TO TOP SHOT OFFSET: 8.8', CCL STOP DEPTH: 12293.2'. BECAME STUCK IN LTP, LRS PUMPED DOWN TBG & THE TOOLS RELEASED FROM WEAK POINT. TOOLS LIH. POOH WITH ALL ELINE CABLE. **FISH OAL = 55.35'. 1.375" F-NECK. ***WELL LEFT S/I ON DEPEARTURE, DSO NOTIFIED*** 4/21/2021 Assist Eline (PERFORATING) Pumped 42 bbls crude down Tbg for ELine. Pumped EL tool off. EL in control of well per LRS departure. IA,OA=OTG 4/23/2021 ***WELL S/I UPON ARRIVAL*** ATTEMPTED TO FISH E-LINE TOOLSTRING TO DEVIATION @ 12380' SLM ATTEMPTED TO SET 3 1/2 X-LOCK, FLOW THRU SUB, 2.60" BELL GUIDE & 2" RS. GAUGE AND BRUSH FROM 11175' SLM TO LTP @ 11271' SLM. (possible scale) *** WSR CONTINUED ON 4/24/21*** 4/24/2021 ***WSR CONTINUED FROM 4/23/21*** (fish guns) GAUGED W/ 2.80 GAUGE RING TO 11254' SLM. UNABLE TO GAUGE DEEPER (scale) SET X-LOCK CATHCER ASSMBLY IN SVN @ 2126' SLM. FLOWED WELL FOR 2.5 HOURS. FISHED E-LINE TOOLSTRING AND SPENT GUNS FROM 11,245' SLM. ***WELL TURNED OVER TO OPS TO POP, JOB COMPLETE*** 5/22/2021 ***WELL ONLINE ON ARRIVAL, DSO NOTIFIED***(adperf) PERFORATE 12282'-13302' W/ 1.56", 60 DEGREE PHASING, 6 SPF HSC LOADED W/ 3.5G PERFECTA CHARGES. CCL TO TOP SHOT OFFSET: 7.7'. CCL STOP DEPTH: 12274.3'. LOG CORRELATED TO SLB MEMORY CNL DATED 16-AUG-2013 ***WELL TURNED OVER TO DSO TO POP*** Daily Report of Well Operations PBU 11-28B 21 3090 3 175 4 WELL LOG TRANSMITTAL #906003010 To: Alaska Oil and Gas Conservation Comm. December 30, 2019 Atm.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Radial Cement Bond Log: 11-28B Run Date: 9/30/2019 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 11-28B Data in LAS format, Digital Log Image files 50-029-21950-02 RECEIVED DEC 3 0 2019 AOGCC 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com and GANCPDC@USAANC.hou. Date: /ZO)/CZK7 Signed: STATE OF ALASKA RECEIVED E C E I VIE D ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ NO V (j p Pull Tubing ❑ Operationnss shuRIn �O�J ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ ChangGApOGpvpdPrOgrarp ❑ Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other. C(b ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 21 Exploratory ❑ 5. Permit to Drill Number. 213-090 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stretigrephto 11 Service ❑ 6' API Number: 50-029-21958-02-00 7 Property Designation (Lease Number): ADL 028325 & ADL 028321 8. Well Name and Number: PBU 11-28B 9. Lags (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 14733 feet Plugs measured None feet true vertical 8767 feet Junk measured 14015 feet Effective Depth: measured 14692 feet Packer measured 11241, 11370 feet true vertical 8768 feet Packer true vertical 8033, 8123 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 31 - 111 31 - 111 1490 470 Surface 4292 13-3/8" 30-4322 30-3503 5020 2260 Intermediate 5245 9-5/8" 28-5273 28-4101 6870 4760 Liner 6497 7' 5098-11595 3990-8279 8160 7020 Liner 799 4-1/2" 11411 - 12210 8152-8718 8430 7500 Liner 3433 2-3/8" 11297 - 14730 8072-8767 Perforation Depth: Measured depth: 12255 - 14690 feet True vertical depth: 8749-8803 feet Tubing (size, grade, measured and true vertical depth) 3-1/2" 9.2# x 3-1/2" 9.3#, 13Cr80 / L-80 25-11414 25-8154 4-1/2" Baker S-3 Perm Packer 11241 8033 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Perm Packer 11370 8123 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 272 8752 60 1377 219 Subsequent to operation: Shut In 823 418 14. Attachments: (required per20 nac 25 070.25 071. a 25.283) 15. Well Class after work: Daily Report of Well Operations m Exploratory ❑ Development EI Service ❑ Stretigraphic ❑ Copies of Lags and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WOSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Alatalo, Travis Contact Name: Alatalo, Travis Authorized Title: Pmduction Engineer Contact Email: Travis.Alataloatip.com / Authorized Signature: (��/j� Gate: L \l t l ( -�k Contact Phone: +1 9075645351 Farm 10-404 Revised 04/2017 a/� �0 p✓wr-rvp�Wv1� RBDMS�� NOV 0 5 2019 Submit Original Only Daily Report of Well Operations PBU 11-28B ACTIVITYnATF m umw My ****WELL FLOWING ON ARRIVAL****(pre pert) MAKE 2 ATTEMPTS W/ 20' x 1.75" BAILER TO 11,280' SLM (R -NIP). **unable to pass** RUN KJ, 1.75" CENT, 311.25" STEM, 2-3/8" BRUSH TO 12,311' SLM (stop due to deviation) RUN KJ, 10'x 1.75" BAILER, 1.25' INVERTED RS TO 11,282' SLM (unable to pass R -NIP) 4/8/2019 ****CONT WSR ON 4-9-19**** ****CONT WSR FROM 4-8-19****(pre perf) DRIFT TO DEVIATION W/ KJ, 10'x 1.72" DUMMY GUN TO 12,298' SLM.(no issues getting down) DRIFT TO DEVIATION W/ KJ, 20'x 1.72" DUMMY GUNS TO 12,292' SLM (no issues getting down) DRIFT TO DEVIATION W/ KJ, V1.757" STEM, 20'x 1.72 DUMMY GUNS, 1.75 CENT TO 12,300' SLM. ABLE TO PASS R NIPPLE ONLY AT SPEEDS ABOVE 150 FPM. 4/9/2019 ****WELL LEFT SHUT IN ON DEPARTURE, DSO NOTIFIED**** ***WELL FLOWING ON ARRIVAL***(cement bond log / addperfs) RIG UP HES ELINE UNIT 4863. LRS LOADED WELL WITH 15OBBL OF SAFELUBE AND CRUDE FREEZE PROTECT. 8/25/2019 ***CONT ON 8/26/2019 WSR*** ***CONT FROM 8/26/19 WSR***(adperf) RIH WITH RBT LOGGING TOOLSTRING. HANG UP AT 11,282 ELMD IN LTP ASSEMBLY. UNABLE TO FREE TOOLSTRING. PULL FREE FROM ROPE SOCKET. TOP OF TOOLSTRING —11,258'. **JOB INCOMPLETE. LEFT SHUT IN ON DEPARTURE. DSO NOTIFIED.** *** FISH LEFT IN HOLE - RBT LOGGING TOOLSTRING - OAL = 43', MAX OD = 1.69", FISHING 8/26/2019 NECK = 1.375", WEIGHT = 357# *** ***WELL SA ON ARRIVAL*** (Perforating) DRIFT TO 35 KB LTP W/ 2.60" BELL GUIDE, 2.00" JUS AT 11,268' SLM / 11,282' MD. UNABLE TO PASS 11,272' SLM W/ 2.00" RS (Marks on outside from hoping inside LTP). UNABLE TO PASS 11,274' SLM W/ 2.00" RS (Rounded bottom, Unable to pass or latch fish). UNABLE TO PASS X -NIPPLE AT 11,216' SLM W/ 2.72" BARBELL, 3'- 1-1/4" STEM, 1.70" L.I.B. CURRENTLY PULLING OUT OF HOLE TO CHANGE CONFIGURATION. 9/21/2019 ***JOB IN PROGRESS, CONTINUED ON 9/22/19 WSR*** ***CONTINUED FROM 9/21/19 WSR*** (Perforating) DRIFT INTO 35KB LTP AT 11,276' SLM W/ 2.625" BARBELL, 1.70" LIB (No impression). DRIFT TO DEVIATION AT 12,374' SLM W/ 2.00" RS PULLING TOOL (No recovery) ***WELL S/I ON DEPARTURE, NOTIFIED DSO OF WELL STATUS*** *** E -LINE T.S. STILL IN HOLE - RBT LOGGING TOOLSTRING - DAL = 43', MAX OD = 1.69", 9/22/2019 FISHING NECK = 1.375", WEIGHT = 357# *** CTU#8 1.5" CT. Job Scope: Fish HES Tools / Cement Bond Log MIRU CTU. Make up Baker Fishing BHA with Stickline 2.0" RS Pulling Tool. Tag GLM #3 at 7072' ctm. RIH/PUH through TOL. 9/27/2019 ***Continue on 9/28/19 WSR*** CTU#8 1.5" CT. Job Scope Fish HES Tools / Cement Bond Log Continue to RIH w/ fishing tools to 11280'. Pooh to check tools. Recovered GLM #3 Dome Valve. Redress pulling tool. Scale in GS pulling tool. Re -run Baker Fishing BHA with SL 2.0" RS Pulling Tool. Tag LTP at 12273'. Unable to work past. Pooh. Re -configure fishing bha with a SL brush above the SL pulling Tool. Re -run Fishing BHA. Latch into fish at 14015'. Unable to pull fish free due to Coil Limit. Pump off fish & POH. Scale inside GS pulling tool. Left bait sub pulling tool assembly in hole ***1.75" x 5.12' *** 9/28/2019 ***In Pro ress*** Daily Report of Well Operations PBU 11-28B ***WELL S/I ON ARRIVAL SWCP 4521 ***(pert) ***CTU #8 PULLED ST#3 RK-LGLV 09/28/19 WHILE RIH TO FISH E-LINE TOOLS*** SET 3-1/2" SLIP STOP CATCHER @ 7244' SLM. SET RK-DOME GLV IN ST@3 @ 7074' SLM (7072' MD). PULLED EMPTY SLIP STOP CATCHER @ 7244' SLM. 9/29/2019 ***WELL TURNED BACK OVER TO COIL*** ***WELL S/1 ON ARRIVAL***(perforation) FISH E-LINE T.S. FROM MASTER VALVE (complete t.s. recovered). ***WELL S/1 ON DEPARTURE, TURNED BACK OVER TO CTU #8*** 9/30/2019 CTU#8 1.5" CT. Job Scope: Fish HES Tools / Cement Bond Log Continue to POH w/ CBL tools - good data (preliminary TOC is above logging interval). Perform weekly BOPE test. RDMO. 10/1/2019 ***Job Com lete*** ***WELL SHUT IN ON ARRIVAL*** (Adpert) INITIAL T/I/O = 2400/800/0. MIRU HES E-LINE. 10/7/2019 ***JOB CONTINUED ON 08-OCT-2019*** ***JOB CONTINUED FROM 07-OCT-2019*** (Adpert) PERFORATE 12,255'- 12,276'W/ 1.56" PERFECTA, 6 SPF, 60 DEGREE PHASE GUN. ALL LOGS CORRELATED TO SLB MCNL DATED 16-AUG-2013. 10/8/2019 ***JOB COMPLETE ON 08-OCT-2019*** TREE= 4-1/16" CIW WFLLHFAn= CJW BF. 13EV - KOP = Max Angle = 1 113' I m MD = 12394' 1 91.5#, H-40, m TVD= 8800' D=19.124 - I 3-3M- 9.124"13-3/8' CSG, 68#, LA0, D = 12.415' 4327' 9-5/8" CSG, 47#, L-80 BTC -M, D= 8.681" ^6272 Minimum ID = 1.781" @ 11301' 2-3/8" R NIP INSIDE PTSA TBG, 92#, 13C bpf, ID = 2.992" 11-28B =CRTBG***38ACSGSETON EMERGENCY WELLBORE'S NOT SHOWN 2126' 3-12'H2SX NP,D=2.813' ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3937 3261 49 MMG DONE RK 16 1027116 3 7072 5252 47 MMG DOME RK 16 0929/19 2 9303 6742 49 MMG DONE RK 16 1125113 1 11156 7976 52 MMG SO RK 24 1125113 ouab Icy -]/6" X /' BKR ZXP PKR D = 6.313' 6118 9-5/8"X 7' BKR HMCFLIX LOCK FGR, D AUDI4 INITIAL COMPLETION CTU LATCHED TOOLSTRNG 14015' (09/29/19) AO_LOLIT WINDOW (11-28A) 5272'- 5295' 11219' 3.12"H6XNP,D=2.813" 11237 3-12"X4-1/2"XO, D=2.960' 17239' 7" X 4-12" BKR S-3 PKR D = 3.875" 11243- 4-12" X 3-1 /2" XO, D = 2.950" �11374' 3-12" TBG, 9.3#, L-80 EUE 8RD, I 11414' 14015 11386' .0087 bpf, D=2.992" AUDI4 INITIAL COMPLETION CTU LATCHED TOOLSTRNG 14015' (09/29/19) 0826100 N7ES SIDETRACK 11410' 29#, L-80 HYD 511, D = 8.184" 11694' N3S RWO .0039 bpf, D = 1.995" OBM8/13 YORDIC I CTD SIDETRACK (11-28A) 11411' q#, L-80, .0152 bpf, D = 3.958" —12210 TFA/JMD ADPERFS -12' WHIPSTOCK (07/70/13) 12208' CJWJMD SET LTP w/NS PTSA & R NP (02/16/18) 11414' II9A47' PERFORATION SUMMARY REF LOG: SLB MCNL/ GR/ CCL ON 08/16/13 ANGLE ATTOP PERF: 51'@ 12255' —SEE PG 2 FOR PERFS-• I I 1KR DEPLOY SLV, D = 2250 R NIP, D - 1.781" HES XN NIP, D = 2.750" A n-vz- 12"X4 - X 4-12" FM BEHIND CT LNR ao rnrt, u = s.010 0, D = 2.992" ', D = 2.750" SACK SL— V BEHIND =3.958" CT LNR PKR w / LNR HGR ID = 4.375" 4-12"NALOUTWNDOW (11-288)12210'-12218 I 1 -12300 1 I PBTD I OF DATE 14015 FISH: THREE 2'X1-12' SLP SECTIONS FROM 35KB, 1 ELEMENT, UNKNOWN DEPTH (1r2211 8) AUDI4 INITIAL COMPLETION CTU LATCHED TOOLSTRNG 14015' (09/29/19) 0826100 N7ES SIDETRACK 2-3/8' LNR 4.6#, 13CR-95T H-511, 14730' N3S RWO .0039 bpf, D = 1.995" OBM8/13 1KR DEPLOY SLV, D = 2250 R NIP, D - 1.781" HES XN NIP, D = 2.750" A n-vz- 12"X4 - X 4-12" FM BEHIND CT LNR ao rnrt, u = s.010 0, D = 2.992" ', D = 2.750" SACK SL— V BEHIND =3.958" CT LNR PKR w / LNR HGR ID = 4.375" 4-12"NALOUTWNDOW (11-288)12210'-12218 I 1 -12300 1 I PBTD I OF DATE REV BY COMMENTS DATE REV BY 11 COMMENTS 0726189 AUDI4 INITIAL COMPLETION 0828/l9EPD/JMDSETFLSH-TOOLSTRNG LEFT DH 0826100 N7ES SIDETRACK 10/16/19 CJWJMD GLV C/O 0929/19) 04117106 N3S RWO 10/16/19 MS/JMD RECOVERED FISH 09(30/19 OBM8/13 YORDIC I CTD SIDETRACK (11-28A) 10/16/19 MS/JMD A3PERFS(10/08/19) 01/31/18 TFA/JMD ADPERFS 02/19/18 CJWJMD SET LTP w/NS PTSA & R NP (02/16/18) PRUDHOE BAY UNIT WELL: 11-28B PERMIT No: #2130900 API No: 50-029-21958-02 SEC 28, T11 N, R1 5E, 745' FSL & 291' FEL BP Exploration (Alaska) PERFORATION SUMMARY REF LOG: SLB MCNL/GRI CCL ON 08/16/13 ANGLE ATTOP PERF: 51'@ 12255' Note: Relerto Pmducticn DB for Nstarical perFdata SIZE SPF NTERVAL OprwSQz SHOT SOZ 1.56" 6 12255-12276 O 10/08/19 0811813 1.56" 6 12435-12465 O 01/31/18 02119/18 1.56" 6 12465-12525 O 01/30/18 1.56" 6 12595-12625 O 01130118 1.56" 6 12645-12676 O 01/29/18 1.56" 6 12676-12739 O 01/28/18 1.56" 6 12910-13060 O 08/17/13 1.56" 6 13170-13280 O 08/17/13 1.56" 6 13190-13220 O 12/24/16 1.56" 6 13230 -13260 O 12/24/16 1.56" 6 13350-13460 O 08/17/13 1.56" 6 13370 -13400 O 1223/16 1.56" 6 13410-13440 O 122216 1.56" 6 13675 -14150 O 08/17/13 1.56" 6 14530 -14690 O 08/17/13 11-28B DATE REV BY COMMENTS DATE REV BY COMMENTS 0726189 AUDI4 INITLALCOMPLETION 0828/19 EPD/JMD SET FISH- TOOLSTRNG LEFT DH 08@6100 WES SIDETRACK 10/1619 CJWJMD OLVC/O(092919) 04/17106 N3S RWO 10/16/19 MS/JMD RECOVERED FISH 09/30/19 0811813 VORDIC 2 CTD SIDETRACK (11-28A) 10/16/19 MS/JMD ADPERFS (1010819) 01/31/18 TFA/JMD ADPERFS 02119/18 CJWJMD SET LTP W/NS PISA & R NIP (02/16/18) PRUDHOE BAY UNIT WELL: 11-28B PERMIT No:'1130900 API No: 50-029-21958-02 I. T11 N. RI 5E. 745' FSL & 291' BP Exploration (Alaska) STATE OF RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISIN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed MAR 1 4 2018 Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change AA ' •. C CO Plug for Redrill 0 Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well 0 Other: Set Liner Top Packer I I 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 213-090 3. Address: P.O.Box 196612 Anchorage, Development IZI Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21958-02-00 7. Property Designation(Lease Number): ADL 028325,ADL 028321 ' 8. Well Name and Number: PBU 11-28B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 14733 feet Plugs measured None feet true vertical 8767 feet Junk measured 11297 feet Effective Depth: measured 14692 feet Packer measured 11241,11370 feet true vertical 8768 feet Packer true vertical 8033,8123 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 31-111 31-111 1490 470 Surface 4293 13-3/8" 30-4322 30-3503 5020 2260 Intermediate 5245 9-5/8" 28-5273 28-4101 6870 4760 Liner 6498 7" 5098-11595 3990-8279 8160 7020 Liner 799 4-1/2" 11411-12210 8152-8718 8430 7500 Liner 3433 2-3/8" 11297-14730 8072-8767 Perforation Depth: Measured depth: 12435-14690 feet True vertical depth: 8803-8768 feet SCAMS Tubing(size,grade,measured and true vertical depth) 3-1/2"9.2#13Cr80 x 3-1/2"9.3#L-80 25-11414 25-8154 Packers and SSSV(type,measured and 4-1/2"Baker S-3 Perm Pkr 11241 8033 true vertical depth) 4-1/2"Baker NSCT BXP Pkr 11370 8123 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 269 4152 29 1121 206 Subsequent to operation: 322 5802 26 1123 211 14.Attachments:(required per 20 AAC 25.070.25.071,s 25.283) 15.Well Class after work: Daily Report of Well Operations RI Exploratory ❑ Development Eif Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Summers,Matthew Contact Name: Summers,Matthew Authorized Title: Production Engineer Contact Email: Matthew.Summers@bp.com Authorized Signature: ,' _ .. Date: 3/fc9/C/— Contact Phone: +1 9075645066 Form 10-404 Revised 04/2017 V / 1. 3//�2 1-1/v _ `V/ q�118 Submit Original Only 04 "/_ r/�� RED ??1a7 1,\J "tFlii J t • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report Of Sundry Well Operations (10-404) March 13, 2018 To Whom it May Concern: Attached please find the Report Of Sundry Well Operations for Set Liner Top Packer (LTP) and Perforate for Well PBU 11-28B, PTD #213-090. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • Daily Report of Well Operations PBU 11-28B ACTIVITYDATE SUMMARY ***WELL S/I ON ARRIVAL SWCP 4518***(perforating) RAN 2.78"SWAGE &2.50" LIB S/D HIGH @ 396'SLM, WORK TOOLS DOWN TO 521' SLM. DRIFT W/ 2"CENT& 1-3/4" S-BAILER&STOP @ 3000' SLM. (paraffin recovered) RAN 2.31"G-RING &STOP @ 3000'SLM MULTIPLE TIGHT SPOTS FROM 550' SLM TO 2700' SLM. RAN 2.50"G-RING & ENCOUNTER TIGHT SPOTS FROM 550'SLM TO 1400' SLM &GETTING WORSE. RAN BRUSH &2.50"G-RING FOR BRUSH & FLUSH STOP @ 5000'SLM. RAN 2.78"SWAGE &2.50" LIB 11,267' SLM GOOD IMPRESSION OF F/N OF LTP. PULL 35KB LTP FROM 11,267'SLM & HANG UP IN X-NIP @ 11,249' SLM. 1/21/2018 ***CONTINUE WSR TO 1/22/18*** T/I/0=1575/1300/0 Temp=S/I (LRS Unit 70-Assist Slickline: Brush & Flush) Pumped 60 bbls 180*hot crude down TBG while SL brushed. Slickline in control of well upon departure. IA OA= OTG. 1/21/2018 FWHPS=1090/1360/0 ***CONTINUE WS FROM 1/21/18 SWCP 4518***(perforating) PULLED 35 KB LTP FROM 11,249' SLM/ 11,288' MD (missing 1 1/2 elements&2 1/2 slips) RAN 3 1/2" BLB, 2.60"WIRE GRAB#27 TO DEP SLV @ 11,277'SLM (no recovery) RAN 10'x 2.50" P-BAILER, 2.70"WHISKER BASKET BTM TO DEP SLV @ 11,277'SLM (no recovery) RAN 2.10" MAGNET#10, ZELDA MAGNET#11 TO DEP SLV @ 11,277'SLM (no recovery) DRIFTED 10'x 1 3/4" PUMP BAILER, STOP DUE TO DOG LEG @ 12,226' SLM (12,246' MD) ***WELL LEFT S/I DSO NOTIFIED ON DEPARTURE*** ****FISH IN HOLE TWO 2"x 1 1/2" SLIPS FROM 35 KB LTP**** ****FISH IN HOLE ONE 1"x 1/2" PIECE OF SLIP FROM 35 KB LTP**** 1/22/2018 ****FISH IN HOLE 1 1/2" PIECES OF ELEMENT FROM 35 KB LTP**** Unit 1 Assist CT/FLow back Begin on WSR 1/25/18 Unit move Rig up/PT. Continue on WSR 1-26- 1/25/2018 18 1/26/2018 Unit 1 Assist CT/FLow back Continue from WSR 1/25/18 SB for CTU. Continue on WSR 1-27-18 Unit 1 Assist CT/FLow back Continue from WSR 1/26/18 SB for CTU,Pop and flow well. Continue 1/27/2018 on WSR 1-28-18 CTU#8. 1.5" CT. Job Scope: Drift/Log/Perforate MIRU CTU. MU & RIH w/WFT 1.70"Venturi BHA. POP Well thru Well Testers. Circulate 1% KCL w/Safelube while rih. Tag at 14044'down/ 14035' up. Tag below the 14000'target depth. Pooh. Nothing recovered inside Venturi. MU &RIH w/HES Logging BHA& 1.75" Nozzle. Log form 12907'to 11000'. Flg pipe at 12750'. Pooh. Tie in to SLB MCNL log dated 16-Aug-2013, (-1' correction). Have well testers start rigging down. 1/27/2018 ***Continued on 01/28/18*** CTU#8. 1.5" CT. Job Scope: Drift/Log/Perforate MU & RIH w/HES 1.56"x 31.25' Perfecta Perf Gun#1. Have well flowing down it's own flowline at 1000psi. Correct depth at flag. Perforate Interval 12704.5'- 12735.75'. Pooh. All shots fired, ball recovered. MU & RIH w/HES 1.56"x 31.25' Perfect Perf Gun#2. Correct depth at flag. Perforate interval 12673'-12704'. Pooh. Stack down to change packoffs and inspect chains. 1/28/2018 ***Continue on 01/29/18*** Unit 1 Assist CT/FLow back Continue from WSR 1/27/18 Flow weII,RD Unit Move. End on WSR 1/28/2018 1-28-18 . • Daily Report of Well Operations PBU 11-28B CTU#8. 1.5" CT. Job Scope: Drift/Log/Perforate MU & RIH w/HES 1.56"x 31.25' Perfecta Perf Gun#3. Correct depth at flag. Perforate Interval 12642'- 12673.25'. Pooh. All shots fired, ball recovered. Trim 100'of pipe&change packoffs. MU & RIH w/HES GR/CCL BHA& 1.75" Nozzle. Drift to 12700'. Log from 12700'- 11100'. Flagged pipe at 12544'. Pooh. Tie in (+4.5'correction). MU & RIH w/HES 1.56"x 31.25' Perfecta Perf Gun#4. Correct depth at flag. Postion gun at shot depth. 1/29/2018 ***Continued on 01/30/18** CTU#8. 1.5" CT. Job Scope: Drift/Log/Perforate Perforate interval 12592'-12622'. Pooh. MU &RIH w/HES 1.56"x 30' Perfecta Perf Gun#5. Correct depth at flag. Perforate interval 12492'- 12522'. Pooh. All shots fired, ball recovered. Trim 100'of pipe. MU & RIH w/HES 1.56"x 30' Perfecta Perf Gun#6. Correct depth at flag. Perfoarte interval 12462'-12492'. Pooh. MU &RIH w/HES 1.56"x 30' Perfecta Perf Gun#7. 1/30/2018 ***Continued on 01/31/18*** CTU#8. 1.5" CT. Job Scope: Drift/Log/Perforate RIH with perf gun#7 to flag. Correct depth. Perforate interval 12432'-12462'. Pooh. Left well flowing. RDMOL. 1/31/2018 **Job complete** _ ***WELL SHUT IN ON ARRIVAL***(Perforating) DRIFTED TO TOP OF LINER AT 11,280'SLM W/2.80"CENT&2.50" LIB (Picture of deployment sleeve). DRIFTED TO AND STUNG INTO LINER W/DMY 35 KB PKR, 10' PUP, AND NS PSTA(11,280' SLM). LRS LOADED TBG W/ 150 BBLS CRUDE. SET BAKER 35 KB LTP PACKER/ 10' PUP/2.25" NS PTSA(w/1.781" R NIPPLE and plug)AT 11282' MD. 2/16/2018 ***CONT. ON 02/17/18 WSR*** T/I/0=2369/1495/vac (LRS Unit 42-Assist Slickline: Liner Top Packer) Pumped 2 bbls of 60/40 MW folllowed by 150 bbls of crude to load TBG. 2/16/2018 ***WSR continued on 02/17/2018*** ***WSR continued from 02/16/2018*** (LRS Unit 42-Assist Slickline: Liner Top Packer) PRESSURE TEST on LTP***PASSED**@ 2623 psi Max applied pressure=2750 psi Target pressure=2250 psi. Pressured TBG to 2750 psi with 11 bbls of crude. TBG lost 92 psi in 1st 15 minutes and 33 psi in the 2nd 15 minutes for a total of 125 psi during 30 min pressure test. Bled TBG to 600 psi. 2/17/2018 Final WHPs=600/1424/2 ***CONT. FROM 02/16/18 WSR***(Perforating) LRS PRESSURE TEST OF LTP TO 2623 PSI PASSED PULLED 1.781" RR PLUG W/RETRIEVABLE GUIDE FROM R NIPPLE @ 11283'SLM 2/17/2018 ***WELL LEFT SHUT IN, DSO NOTFIIED*** Fluids Summary Bbls Type 221 CRUDE 2 DIESEL 284 60/40 METHANOL WITH SAFELUBE L/ 34 60/40 METHANOWATER_ 796 1% SLICK KCL WITH SAFELUBE TREE= 4-1/16'CJW . _ WELL WVEL.LFEAD= OW I � -8--JIRO2 8 ACTUATOR= GW 3-112"CR TBG*** 3/8 SET ON EM 33ERGENCY M14L KB FILO 63' SUPS r*'PREVIOUS WELLBORFS NOT SHOWN BF B_EV= 21.28' KOP= 800 I 2126' 3-12"HES X NP,D=1?-813" Max Angle= 93"@ 13441' 20'CONDUCTOR, Etain Datum MD= 12394' 91.5#,H-40, GAS LFT MANDRELS Datum TVD= 8800' D=19.124" 1: ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3937 3261 49 WAG DOME RK 16 10/27/16 3 7072 5252 47 MAG DOME RK 16 10/27/16 1_13-3/8'CSG,68#,L-80,D=12.415"J-{ 4327' 2 9303 6742 49 MMG DOME RK 16 11/25/13 1 11156 7976 52 MAG SO RK 22 09/21/15 5 6096 H9-5/8'X r BKR ZXP PKR D=6.313' I (9-58'CSG,47#,L-80 BTC-M,D=8.681" --I -6272 6118 J--$9-5/8"X 7"BKR HMC FLEX LOCK HGR,0=6.875" I Minimum ID = 1.781" @ 11301' 9-5/8"MLLOUT WWNDOW (11-28A)5272'-5295' 2-3/8" R NIP INSIDE PTSA ' 11216' -I3-112'HES X NP,D=2.813" 11237' --{3-1/2"X 4-1/2'XO.D=2.960" I 11239' -17'X 4-12"BKR S-3 FKR D=3.875' 11243' -14-1/2'x 3-1/2'XO,D=2.950' I I I 11264' I-I-1/2"HES X P .D=2.813' 11282 H35KB LIP/NS PTSA(02116/18) TOP OF 2-3/8'LNR!--{ 11297' I 11297 H2.70'BKR DEPLOY SLV,D=2.250' 11301 H2-318'RNP,D=1.781" 3-1/2'TBG,9.2#,13CR VAM TOP, -I 11336` In---- I 11316' -I3-1/2"HES XN N�D=2.750" .0087 bpf,D=2.992" 1. 11339 -17'X 3-12'UMCKE OVERSHOT BEHIND CT LNR I3-1/2"TBG STLE(03/21/06) H 11339' 11368' H3-1/2"X 4-1/2'XO,D=2.937' FISH:THS 2"X1-1/2'SLP SECTIONS FROM -I I 11370' -I r X 4-1/2"BKR S-3 POI.D=3.875' I 35KB,1 ELEMENT,UNKNOWN DB'TH(1/22/18) 11374' IH4-112"X 3-1/2"xO,D=2.992" 3-1/2'TBG.9.3#,L-80 BJE 8RD, H 11414' iss---------I 11396' 3-1/2" Es XN MR D=2.750"J .0087 bpi,D=2.992' L11410' -{,TOP OF BKR TRACK SLV.D=5.25' Ir LNR 29#,L-80 HYD 511,0=6.184' H 11694' 11411' H3-1/2'X 4-1/2"XO,D=2.992"J BEHIND 4-1/2'LNR 12.611,L-80,.0152 bpf,D=3.958" -{ -12210 , 11414`_H4-12"VVLEG, D=3.958'i CT LNR 14-12"WHIPSTOCK(07110/13) -I 12208" 1 11417 i-1r X 5'BKR ZXP PKRw/LNRHGR,D=4.375" I 4-1/2"MLLOUT WINDOW (11-28B)12210'-12218 PERFORATION SIMuiARY REF LOG:SLB ADN.!GR/CCL ON 08/16/13 ANGLE AT TOP FREE: 89'(fp12435' -12300 HTOP OFC8l81T(08/15113) i Note:Refer to Production DB for historical pert data MI SIZE I SPF 1 INTERVAL l Opn/Sqz i SHOT f l SO2 ■ -SEE PG 2 FOR FSS- ■ 1 PBTD - 14692' •:',. 2-3/8'LNR,4.6#,13CR-85 TH-511, -{ 14730' .0039 bpf,D=1.995' DATE REV BY COtv8UiTS DATE REV BY COMMENTS PRUDHOE BAY UNT 07/28/89 AUDI 4 INITIAL COMPLETION 01/23/18'JMG/JMD PO.LLI)LTP&SET FISH(01/22/18) WVH_L: 11-288 08/26/00 NMI SIDETRACK 01/29/18 CD/A0 CORRECTION TO MN D PBRMT IVa::"2130900 04/17/06 N3S IMO 01/31/18 TFA/JMD AOFERFS AR No: 50-029-21958-02 08118/13 1400 C i CTD SIDETRACK(11-28A) 02/19/18 CJHYJMD SET LTPw IFS PTSA&R M71(02/16/18) SEC 28,T11 N,R15E,745'FSL&291'FB. 12/27/16 JDMJAO ADPBRFS(12/22-24/16) 12/28/16 CJWJMD SET LTPw/PTSA&RNP(12/26/16) BP Exploration(Alaska) 4 • 11 -28B • [11 II I I PERFORATION S&*WARY REF LOG:SLB MCMI GR/CCL ON 08/16/13 ANGLE AT TOP FERF: 89*@ 12435' Note:Refer to Production DB for historical perf data / 1 SIZE SPF NTE VAL Opn/Sqz SHOT Rn7 1.56" 6 12435-12465 0 01/31/18 1.56" 6 12465-12525 0 01/30/18 1.56" 6 12595-12625 0 01/30/18 1.56" 6 12645-12676 0 01/29/18 1.56" 6 12676-12739 0 01/28/18 1.56" 6 12910-13060 0 08/17/13 1.56' 6 13170-13280 0 08/17/13 1.56" 6 13190-13220 0 12/24/16 1.56" 6 13230-13260 0 12/24/16 1.56" 6 13350-13460 0 08/17/13 1.56" 6 13370-13400 0 12/23/16 1.56" 6 13410-13440 0 12/22/16 1.56" 6 13675-14150 0 08/17/13 1.56' 6 14530- 14690 0 08/17/13 1 1 1 • • %1 r■, .111 NY DATE REV BY COMFITS DTE REV BY COMMENTS PRUDHOE BAY UNIT 07/26189 AUDI 4 INITIAL COMPLETION 01/23/18 JMGJJMD MUM LTP&SET ASH(01/22/18) WELL: 11-28B 08/26/00 K7ES SIDETRACK 01/29/18 CI YJMD CORRECTION TO WI D PERMT No:"1130900 04117/06 N3S RINO 01/31/18 TFA/JMD ADPERFS AR No: 50-029-21958-02 08/18/13 NORDIC:CTD SIDETRACK(11-28A) 02/19/18 CJWJMD SET LTP w/NS PISA&1214113(02/16/18) SEC 28,T11 N,R15E,745'FSL&291'FEL 12/27/16 JDMJMD ADPERFS(12/22-24/16) 12/28/16 CJWJMD SET LTP w/PrSA&RNP(12/26/16) BP Exploration(Alaska) �� • _c r,-_- r � � .- o a; .D a r W CC -CIa1 O L '� 3 W c 'C f0 s—N �Mm Q N r Y O a, E o z m u Y v o N Q�7 LI a a ,c�., o � 2 • C C a) >. - < 0 a <D r to r v p 6 m L J ,, ,- E +, _C -d O Cr) U L -_ CrCk O a C u a) 0 7 (0 L W ,--V1.. H r M N N OU -0 O a"' Z'. Q (1) p u Z Q a G., >, 0 CU C(> 3 • (1) O C L Q < L-:x iii �+ u 03O F- 03 v -0 NU L >:... -I 0 L] UA O W_ W W W_ 1-- LL it LL LL Q .0 > L aJ G Q J J J -I4-4 .- FJ N C `E. O CT, < z Z_ Z_ 2 al ) OQJ > - LL LL LL LL C N C Lb ... N >ft C N a; E a; u v O Z C O Q Iv D U 0 wa m °- a• ai o_ C CIS > Z Z1 W W c it G. o a g o LL .t, V CO:rel N J LY �-05' C F o 4 ;; z J a � W a4 V ^ Ln a ` a Y. (ID o $ [ CV a *25 ► CM O 4 z, VI ` a w a LIS Z a a a a 2 2 03 03 CO CO LA 0 0 0 0 o = _ _ = a -10000 101 W DDM W LY LY LY ccca O aaaa �, c a X °° o o O in N N of !V N o 'n o • a)o O o o W ♦�( 0 0 0 o v Q p v co O co v) oe, NLL N M ,� a1m Q Q Q 1MOnoW ° oWm s O u CE Q N N N0 4 Q +1+ O O O OTo It et r oo v {r{7 1.000 N � N !C'0 1� O O OCV N E — N N N N N H C O O O O C 0 p N N N N 01 O O O O 0 C O O O O " 4-, U 03 4 v) v, cn LI, a cCO aa ce in a SE •et �° g � cia LI ;:c` QQ W rl .... �° v c _o N mr LA ` ��... 6 Q O u+,. Q V ,_ Q C tests O a ONS � L� 12 Q � as as ° am rSTATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate IZI Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Set Liner Top Packer m 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 213-090 3. Address: P.O.Box 196612 Anchorage, Development El Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21958-02-00 7. Property Designation(Lease Number): ADL 0028325 8. Well Name and Number: PRUDHOE BAY UNIT 11-28B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 14733 feet Plugs measured feet true vertical 8767 feet Junk measured 11297 feet JAN 2 4 2017 Effective Depth: measured 14692 feet Packer measured See Attachment feet true vertical 8768 feet Packer true vertical See Attachment feet OG C. Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#11-40 31 -111 31-111 1490 470 Surface 4293 13-3/8"68#L-80 30-4322 30-3503 5020 2260 Intermediate 5245 9-5/8"47#L-80 28-5273 28-4101 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED MAR 0 8 2017, Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 261 3396 22 856 223 Subsequent to operation: 1138 2282 101 1511 271 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations H Exploratory 0 Development EI Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil El Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Phone +1 907 564 4424 Date 1/24/17 Form 10-404 Revised5/20 ' � Z /`� 17 RBDMS w JAN 2 0 2017 ....2/;;;;s/brt.-- Submit Original Only • • Packers and SSV's Attachment PRUDHOE BAY UNIT 11-28B SW Name Type MD TVD Depscription 11-288 PACKER 5097.75 3989.83 7" Baker ZXP Top Packer 11-28B TBG PACKER 11241.5 8033.28 4-1/2" Baker S-3 Perm Packer 11-28B PACKER 11288 8065.66 3-1/2" Baker KB Top Packer 11-28B TBG PACKER 11370.11 8123.39 4-1/2" Baker NSCT BXP Packer 11-28B PACKER 11418.19 8157.08 5" Baker ZXP Top Packer • •' w o 0 0 0 COto o co co CO N O c O CO N N- O to ,- 0 N U +r0000000Oo C)) NI- (0 C') (NI CO CO m CO CO CO r r � CO a- CA CO CO I's OI. COa- 00000 M CO CO CO CO CO CO O N N co T- 0000) N. co a OO M M N O) 0 I. N %- MM CO CO CO CO CO W Gn• co N CI) O O CV E IC I's cOr e- CO CNf) r Tr N V 4.0Z Q a N. Cr) M OC7000) C) CC) t M M N CO a- a- N N _ M� r r a- .0 CO 0 O 00 OO C70OOc p tl0 � 00 co `- co •N • • Nr O CO v- N CA N 0) EO N _ 00 O CV a CV (.75 N M C? N N M Cr) LOaocorn _ C CO0N N �t CO7 0 M M N- J LO co M h W c C 01-1 ' U W W co 2 U 0 u_ rtccw w ceZ Z Z t W W W W W m pp Q D Z Z Z Z D D U u) z J J J H • S a) la m• Ns N ON 00 O Ln CA LC) t [F CO L17 O CO - N 00 U) UD d' co N N CA 0 C N- OD co OD OD cc OD 0N- CO G OD O co O O 000 000 OOO 0 00 00 0~0 ODN- O O. O N (Vcf N O CO co co = cameo OOOCc — NOONOO d a) a) a °) rnNOO0000000OONN-15. C5 W v- _0) C� Is CO I' N- C- N N- N- N- > ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 re W p ❑ ❑ w H 0 W ❑ a 55Y 0 CO m CD CD _ m m W Y Y Lice w CD— , 0CDCV 01 O0CD C5 CD 00O- OO . ccccii)CD a) J J J a s U) z N O '- N N N N M mP '' O — COQ Q Q C 1 O C) c�) N) MMMMMMMM � � . U U U O J J D p O r y HUH Oz � Z 2220cOcO) a) cgvai • Q = a • t 0 0 0 O O O O O O O O L f) Y- O O O. C0-, CD N M CO U) N- O N- CO M W Y.1 d O N N N N M CO d' CO O O O N CO) CO CO co co co co co co co co • W �+ L 0) _ _ O ccuI 00 u) 0 a 2 O u~) ccn (O u) C/) ate „ a u w• ceccu_ ccu_ ceceu_ uUccceU) u) Iawwawawwawawwaa QaaQaQaaQaQaamco O t al 0. O MCOCO0000COCOCOCOCOCOLnLp1.0 • „ 0 0 0 0 0 0 0 0 0 0 CD C5 ❑ CD CD C5 LU O N N N N N N N N N N N_ N_ N_ z u IQIZ.I N- N N N N N N N N CO CO N N O O O O w W J 111 p N CC ON N N N N N N N N N N N N O z Jct W W W LL W m0DWJJJJ0WW Q < 0_ C/) Ll. LL ;/) U co 0_ 0: N E Z mmmmmmmmmm00mmm O O O co O O CO O CO O O O O O • N N N N N N N N N N N N N N m a 0 W O —ILL NN W d < < CO CO LL LL N (/) 0. 4= ' • • Q CD-0 C Nc C 0 > a co c i vi . c'i ce O a C') M C C6 'N M N- CL 0 L a 4- ~ N- la M M a N N C �' 0 M p r c`�icn m m '� Q c � 3 3 � � �) 3 C d a- a) n— a)-0 a> 3 o C7 } o to _ � (D 'N @� QN • L O � T. 0 z0 2 b pN aiC T- C C) •- ' .c.. O 0• 3 o C -p Q O C J N `- - J r) O o > 0 CO- c 0 O '3 � 0c 0 c Q II . U N N C -' C O N Q N U a - �ct U) 'N a •°-2 VT- ' �� 30 - � (� C° O � -Jli o oa -I CD o c6 - - QU W 3 ap - ate) N2fn �� fn � a) 4, c0 QC) C _co 3 3ma - orno °) rn CD a* p • N O N C) '� -c) 1.0 3 0 0)N 6 a N y C N O = a 0CL E • o p a.O E CD C• a N ~ C C m0 2 , , •0 .o c- o _N Q a _c "- >0 0) 0 0) a) .0 p Z N oI- Q on 17a co ,- -a I` --a c N4- ~ U') -p O (n � 2 a) 2 a) fn c .2 O ,- II © 4: N a) 7 CD f- o CN M N M20 (9 a0 mu) fnJ ' �a 0 �o a N � N � w cn iti a) 0 An � > -u- r a� W - W 0 EN Q � or u) Cs� +.-. N a) = crQ NQ Ex (MO JUr' mJMLn � * Q- 8) II • - cC5CC O o `O2 7 � rX = L r 2 a) Oc! m -1 ca u 0 U) 0 LO In' O +. IZ •gyp V +. E � � Ln g Em0 c `oLW a_ L0 a) a) a = -E .- a) I- a)) U) w , O2 Lu 1:1 <a piu) Q 2Cy .ULNw C N -a N p p fn U) NuE (0u) c‘,-- fn S i `- u) — , � in .2 0 o0 -,-,.i a) E �' t02 Z O N Q � N N (n .,°),_1°. � < 0 N 0 a) E Z O Z z .� - a z - - U Q Q ( >— J Cha o ©Tad — w a) O -_- — U)) m m -0 0_0 : - zcc ce > ww O~ ' m ~ O O - 45 'c O 0 '8ov OO � 2EWOOW �2li < •. J . WJ (L0a •� 01 - COLc)im H Q O ZOoa aOamaaoOo Tam C m TaOZZJIu) � � QI= � ~ �aQo oQ a Oa (/) aS.- .- JamOc� • O W (DwofjN (N Z II 0O 0 o c)O a � 0 cnv) a)cfl •- � = aa) ami a) rnco Q � Jopa .- .- a WMuj a(DQfnt9. aa)) sQm ?A -0 0 .c � 3 a o C � dI d) QNO � � O � � � E II � � C II - Op= CO OaC rn O N - � re 0 o � � I- QaE- ax- D � o0 E J CD E cm2b C-� " s � 3 � � � n �aaaaJa fn a a) 0 •c II a) TDI c> II V .c0 c: O E cD oO ct .at d QZ � JJ --I 0 (3III Z aQTtg �.° a) 2 • 2a-2 - ° vs o oI- � O .( CI (xQmmmmmZ - w or- 'v) J o_ O < 097 u) E o - . rn � u_ F.Y )ntoto � ~ Qov NU � coo Up > 0<1- Q EE- ao � �oto., „ E Nr- _ a0tnMMMC'') � > Z � II co NM rn II N Cl) II (oa (O � 2 CN NN U (o O W JM , wLLaaw0NL > N .D a> \ > p)> : Q.. C tc\1 aN •C . C Z < wY00Ywmi75CI1CO , cu) Mo W ,- cmi) o c' occfn) = rn = o 0_ oo = a1 = O PQaaQO1- JN C\1 N- 2a CO m u) CL ccn a) c`2 v) va = i v) a) co z - < 030003 _,t mi_ w II @ II `- C) to II U c a) _ a) C O MN }, aa) a) = 0 J J J a) cu 5 E- N E- . O II (A E- E- .} 6,- 0 J C5 J (. 0 _. _.- Q ti Q U A m O Q a fn > v) c E 0)O ca N = fn C .- < < < < a * - >. J a 0 > � C Q >CLco CL O m O � `� � m a o cV mE- IlE- I- aa0x I- - U) I- ILI- .SfnE- OOfnJI- JU aal- Q.- 5JfJ .- w Q CO CO (0 CO CO CO CO (D 0 O o O 0 o 0 0 o >-H N N N N N N N N O 0 .- N CO I I 000 5 M N N N .c.:1- ,-. - - \ N N N N O r r r r r Q . • 0 CU(rj Q. �j U N a) 0 c? u>) C) 0) _, cci ;_, _o Q LL `a)a) 3 O N N- 0) y ' = (O = .- d a) +• C O v) O N Q r L- '' N � � o NQQ 3aa) N ° O m --0 0 3 m , r � � � o a rI io O N �� Y cc CL m � u) Ne- CeEN o.O � co O N E CO rn = = = mH a) � N a) coo (nIr O p) . Q c Q � U CO U oN � � roi > � � o E o co 0 05 01' m a) u) EEtLCD — 1 al°i oma EU ° @�;c CV N N •V 2 . a) (n U >, 3 0 0 O O M V N a) rn a) UQ TO Cw -E• O0 ` -O -p 0 = — . r _ � 3 o c ... cs O U o c c c ) c O c%) O cc c cpm r r 0 o N O = j a '3' _c U N d cn U co U o ° g o c ui 0 as is ~ °� a�i }15a }c o • o� � _ 00.� = v NUS 3 a o c _c v) O w .4- 1•_-, N a) (5) a) 6)0- a) �, . 0 tea) 2QQ 0- 0ao C co �Q 0Q-a rE cr. uu)i - = M o aCr c) 7 o � .E2 a) a) s a) c a) E m L 3 rn coa) E U -o' a O p2. NN O a) $ m Io_ U a 5 o E m o ° N c rn a ,., �, aU J O U ° 0 ~ OD Oma) - tea) OUa.•� HccsQ)) � a) 0 �, � � H $ a°)io0 = Z Z V Z 3 J C �c Z � _— .o J 0 C (s ... Y Z ° � fx J 0) a) � d = .� i ,� L a)• (0 H a) a) - o O C .� E U) +. c . Q r O O o O r.. (D toD2 oU5 N 'EU p NI O a) a) N 0)o a) I _ _ sr. Q a CO a CO c ,- a) a °' cn r?CY5 a) Q E Eo a o a ° o •E v C and d � ON QN 3 a r 0_ wi ui = "6 d w , C Q �er) oM t W mo -a,us CV Q o a. -a, a) H ,- Q co u) �° c * _ a Q ;,- -LI; o O c � a0o = � U v .S 0_ o 0-* _ � H a) >� � o iri = g � ,- = u/) - ( min c3 -°°2° 3 Es mt° ' .- UE• -°° ° � c `O Eta � � E � d -po � H 3 a 2 = $2 YNH � Qc Cl. aE) rn 't � ' U U E O Ho2N UD •N 3 H as asNUD ._ o H E O) o a) � � Iii c co CHN � H � Q (n nQ 5, 2 — I- � U CO m L_ 0- 0.- 0 a N N N a cs ai 2 v o .u)- c N 0. o ac) a Q p w c o N (73 (00-2-,. . i . o a E E a) U O Lo Q N c r' O r o a) Q Q — r a) 0 C d . o) CO coo „ c cH = a) i = m 3 = H = 3 o (no0 ,E ac.D •No QH = 3 E (cs (n m i_ co c co 4E' ch.-cc Q o O _ O) w c Q a c O I c0 0 ("naa)) 6 ia) 1_ 0 •a_" Q ° nam) a) CD • o_ a) o ° c � o ? � � o `�?- a� coocE c a) = r a) 7 U CO 8 U N U a) 3 C r v 7 N E U a) = Y -3 r ° = �)o •E C H c - H -0 2oU � (t3 _co 1- ..s 0) (i) = N _ > _0H curio U C `' U c _a (n c N co C om 0 �_ Cl) C C I C Q > O Cl) 0 (h I c O0 (5 _� -JU - .JUa cLO --) -' 0000 Ud u3) o � * _1U 2r0 � 0v.) U E : CD CD (0 CD C0 CD CO r r 0 0 0 0 0 r r r r r 0 0) O O - '- N N N N N NC N N N N N N N CV r r r r r e- V • r C L O N a. ca 3 3 3 coSU .c a) OQ a o CO c0 -a .- CN > I— QU1" a) a a5 N OU N 3 C (Na ; Q ai ?i u) -0N Q> N O . a) ` -a L C C 0 -0 cc '-- a)2 m 3 �' Q•.O au) c a acid u) � a) `C E O C = O >U o > E M CQ.. a) `O O CO QY a > > N > a..- c '+J - _Q- U co to (6 E a E e— En m _ -2 O E < ' _ 2 0 OM 'C N 3 v c rn 3 a) H 0 o0)m c ( o Q (a a) F V a) a) Ua) b ---1 a) N as 7 -a U) 7 O =, .0 Q O C C C p t p g•� c e- . a) -a C i t C O O (� Q 3 O O C O 0 O 0' O U Q o0 • 0) a t J 0 � ++ Q L U• i0 L = N • _ 0 o = C 0 a Q- u) CD v'rn a coi o m 0 O rn a) a) •� a = w -a C C Q -8 }, D - rn o `� � � a0 o c0 N aNi N m O mta = oo M m (c as >, 0 ai C- v a c O Q = '•2O co aii 0 s Q 16 ,C u) c c w D LL •co o a) c D a) a) a - O N — /Li) c1) c ca N a a a) a Ncf) 0) °) a a) a a- Q N C0 = co O ._ c4 OC O _c a) E- O a) •Ca cc oa o • = c oa .- 3CO 0 Q a) E J 01 ° C1- 46 Z Z N N J Cl) a)e- p N N J o CO a)a "- Z a 3 O Z O O ..-FD' a N }' C c 7 0 cc) ., •t 9- C N O U a) "- a) O op N D 3Ma E N uC) a- co .CcNJo o C °) o = 'O L a) c6 CN C Oe— CDi0 N a4 co 0 •— � p f0 L_ v y_• < a QN 04= +.' Le- `C 0__o N •ap 0 a N - � � u) -0 , ON fn +. O m a E Q is m (° o °) n co (n a 00 a o c la_ N O O W aU a) Q •o0 $ o 5 Q E Qo 3 ca 7 L a m U p, 0 = D 3 E oiQ3 • 0--0 E ai•c EL0 � a •= D = QI•- .*K = 0 3 cc D � U _• o � a coC a)s oa Nat o ID 2U > J � � a) � r 0 ecn 0) 3 em +. H c Q0 + v) o •� a DUH c � c- 0 . c - C = a Q rnU - ZOcO (n Q - m FA rnU c JoUe- EE * c co c N u) rn0 0 ~ o u) 'E m Q c cm 0 0 r) a o u) O 0 0) I- = m : Q •c CO N E v _. 1-0. 0 Uv) air) (0o . • u) 0u) � � a a) ? a) 6o Z (, (N . 0 a) } _ _ e- co ? QQ 0 . o • as: o 1— o Dv Q> 7.,-(D0Q • a°'i = UOD � N a a) 6 •• 0- O v) - 0)M C F Q L O N M O N m CO � � � j � � Lii i_ C C O) U = C N N O _0 0) 0 .§ rn > X .UQ H C O W m Z H Q..C a) U) C CN � � O fOQCQ o � � 3 .0 a rn0 := gN � . O c Q a' O ONF- 00 ccoo = '(d = ? I- o — o N `c? a) s Ce ODN * — 4 ce O 0 JUUe- U - a - Q2 II 0 -) a' .� IYe- Qs J0a' e- * 24. JU L_ U CO C0 C0 C0 (0 CO e-- e- e- r 0 c- N N N N N N C) C) V to "a N N N N N N N N N N N N F e- e- e- F F • S c / � 0 ( _ 1- '415 / _ � k % � : o ' k f / c � m �- co 2 = = @ ® 2 /0 LU k 0 al r 6 = Z 2 O .-E. o o "5E / §fo < = cctQ- O _= m E = n m 2 a 0 n_ n m 2 a CD (UC = b 2 CL c £ 2 . k co 3 � '6a) oE .0 E, ca m o $ � ? R � 7 § 03 z re 2 k � � 23E / L m = u) = 7 E Q � § Y Eo k < C" r—. / >1 0. E % a _ * 2 -0 x- § F- 0 02CO kb 0 � aE/ � .§ 5 LU L � k � -- / w � 22 � &� _\ 0 � � u) E0 �� 1_ k/ � ! .e 2 2 ƒ 7 | a 6 O OCi) kI ' - L+ E ■ - c g a) r / N. / 0w c © w ' -qm % Le - CV & oom e - � - .c a_ >+ For 7 ,- \ C) f = � CO 2 R CO [ U) CV R u. � e w f ƒ 0 co / 2 � f / f co m 2 in 2 < « o fX co 0- & ® � @ CO @ . CO ® - w m > CO % 0 � 77 � lN- kk / 0_ k / Ti u. / / / Lu co ® R ? � k -Ik0 / % U � & O � - a) • ° O : � L L .Q < wqk =.- a) $ � / Ou_ � � � < 0 m = E� 2 \ co ® o - � � � �� kw � � R � •- $ 2 % « a) k2f / / | 0 2 0 3 $ \ _1 & ; \ 0_ _ $ 0 1_ 3 2 0 2 ,- 2 co o co \ 2 - % Kq - / CO = ten # Cr) CV q TREE=, 4-1/16"CNV • WELLHEAD= CMJ SAFETY NOTES: WELL ANGLE<70 @ 12333'*** 1 1 ACTUATOR= CNV -2 3-1/2"CR TBG***13-3/8"CSG SET ON EMERGENCY INITIAL KB ELE' 63' SUPS***PREVIOUS WELLBORE'S NOT SHOWN BF ELEV= 21.28' 1 KOP= 800' 2126' —3-1/2"FES X NIP,D=2.813" Max Angle= 93°@ 13441 20'CONDUCTOR, 113' Datum MD= 12394' 91.5#,H-40, GAS LIFT MANDRELS Datum TVD= 8800' D=19.124' 11 ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3937 3261 49 MMG DOME RK 16 10/27/16 3 7072 5252 47 NIG DOME RK 16 10/27/16 13-3/8"CSG,68#,L-80,D=12.415" — 4327' 2 9303 6742 49 MAG DOME RK 16 11/25/13 1 11156 7976 52 MAG SO RK 22 09/21/15 \ 5096 —19-5/8"X 7"BKR ZXP PKR,D 31 =6. 3" BMW,CSG,47#,L-80 BM,D=8.681" — ..-5272 5118 —9-5/8"X 7"BKR MAC FLEX LOCK HGR,D=6.875" Minimum ID = 1.781" 11301' 9-5/8"MLLOUT WINDOW (11-28A)5272'-5295' HES R NIPPLE IN BKR LTP 11216' —13-1/2"HES X NIP,D=2.813" 11237' —13-1/2"X 4-1/2"XO,D=2.960" 11239' —7"X 4-1/2"BKR S-3 PKR,D=3.875" 11243' —14-1/2"X 3-1/2"XO,D=2.950" 11264' —13-1/2"HES X NP,D=2.813" 11288 —135KB LTPw/NS PISA(12/26/16) TOP OF 2-3/8 LNR H 11297' I ' 1 11297 -2.70"BKR DBtOY SLV,ID=2.250" 11301 —1 HES R NIP,ID=1,781"_i 3-1/2"TBG,9,2#,13CR VAM TOP, H 11336' 1— 11315' —13-1/2"HES XN NP,D=2.750" .0087 bpf,ID=2.992" 11339 —17"X 3-1/2"UNIQUE OVERSHOT BEHIND CT LNR 3-1/2"TBG STUB(03/21/06) — 11339' 11368' H3-1/2"X 4-1/2"XO,D=2.937" .1 11370' Hr X 4-1/2"BKR S-3 PKR,ID=3.875" 11374' —41/2"X 3-1/2"XO,ID=2.992" 3-1/2"TBG,9 3#,L-80 EUE 8RD, H 11414' 11395' H3-1/2"HES XN IVP,D=2.750" .0087 bpf,113=2.992" ` 11410' J-HOP OF BKR TIEBACK SLV,D=5.25" 1 0 HYD 511,ID=6.184" — 11594' e 11411' H3-1/2"X 4-1/2"XO,D=2.992" BEHIND 14-1/2"LNR,12 6# L 80 .0152 bpf,ID=3 958" --1_ —12210lk 11414' —41/2"WLEG, D=3.958" CT LNR 4-1/2" M II STOCK(07/10/13) — 12208' 11417' 1--17"X 5"BKR ZXP PKR w!LNR HGR D=4.375" , PERFORATION SUMMARY REF LOG:SLB MCNJ GR/CCL ON 08/16/13 4-112"MLLOUT WIDOW (11-288) 12210'-12218 ANGLE AT TOP PERF: 91°@ 12910 Note:Refer to Rod uction OB for historical perf data SEE SPF INTERVAL Opn/Sqz SHOT SCE 12300_1—{TOP OF CEMENT(08!15/13) 1,56" 6 12910-13060 0 08/17/13 �F 1.56" 6 13170- 13280 0 08/17/13 • ii 1.56" 6 13190- 13220 0 12/24/16 r f 1.56" 6 13230-13260 0 12/24/16 • • 1.56" 6 13350-13460 0 08/17/13 1.56" 6 13370-13400 0 12/23/16 • 1.56' 6 13410-13440 0 12/22/16 { in 1.56" 6 13675-14150 0 08/17/13 { r PBTD — 14692' 1.56" 6 14530-14690 0 08/17/13 !; • STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well Q Re-enter Susp Well 0 Other:Pull/Re-Set LTP Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 213-090 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21958-02-00 7. Property Designation(Lease Number): ADL 0028325 8. Well Name and Number: PBU 11-28B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 14733 feet Plugs measured feet true vertical 8767 feet Junk measured 11297 feet OCT 14 2015 Effective Depth: measured 14692 feet Packer measured See Attachment feet r� sem, true vertical 8768 feet Packer true vertical See Attachment feet G e _ Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 30-110 30-110 1490 470 Surface 4293 13-3/8"68#L-80 30-4322 30-3503 5020 2260 Intermediate 5245 9-5/8"47#L-80 28-5273 28-4101 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 12910-13060 feet 13170-13280 feet 13350-13460 feet 13675-14061 feet 14061-14150 feet 14530-14690 True vertical depth: 8797-8794 feet 8792-8790 feet 8789-8785 feet 8782-8780 feet 8780-8777 feet 8771 -8768 Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): y�e+t� NOV ny Treatment descriptions including volumes used and final pressure: i,0010,0 NO V 2 4 2015 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 3846 142 1124 218 Subsequent to operation: Shut-In 1100 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name 22CCatron,Garry R/(Wipro) Title PDC Principal Engineer 1' Signature r ,- V\., Phone +1 907 564 4424 Date 10/14/15 Form 10-404 Revised 5/2015 V TL_ I 0 /2..! /1 ��D _RBDMSJ�(,1 Z 12015 Submit Original Only • Packers and SSV's Attachment PBU 11-28B SW Name Type MD TVD Depscription 11-28B TBG PACKER 5098 3989.99 7" Baker ZXP Top Packer 11-28B TBG PACKER 11243.02 8034.33 4-1/2" Baker S-3 Perm Packer 11-28B PACKER 11291 8067.76 3-1/2" 35 KB LT Packer 11-28B TBG PACKER 11371.63 8124.45 4-1/2" Baker NSCT BXP Packer 11-28B PACKER 11418.4 8157.23 5" Baker ZXP Top Packer • rn 0000000 QO CO O N ti O 00 CO CO co � N to Ln N 0 r r r U 000O62oOOo i CA N f— CO O M N () CD • 0 00 '- CC M LC) CO CO 0 r c) c) co O) 00 CO N- LO LC) O O N CO '— CO O LO Lf) c- N r-- CO M co co 00 CO co M H O N N CO LC) O O CO C7) f— L1) CO CO O CO CO N CA O r- N- N CO 00 CO CO CO N 6) CA co C.0 CO O CO O O cr M N Ln CO N N- M V szrV N L C 4-0 LLI M I i i i Art ++ CO N- M CO Q N oaorn °) c") _ co co N O r N 2 - M W L O a O � CDc � (0 co co oo M o0 J C) C(c) *k M • • L � M V CV OJ N _ - CA oo O M Ln 00 C O N r N Cr) O) M NM N M t co +-' M LC) CO CO COO 0) 'CrC3) O) O NN 0 00 N N CO O co M N- J N Ln CO M W to 0 W U U 0 W a Z z Z WWWWmm pD ' zzzzDD U (n Z J J J J • 10 b O CO fl m w .E . > cQU) Cl c c0 (4h-,- N L C O > 6.);kr (0 • w N O 0 E N OU C f- f' ‘42,N > N LJ O a O N �C Y U) 0 Z E .- � ���`` (n c- CD RI N U U02S 2i3--1 V N N = z 0 0 N U) f0 N N C C N 0 O N O-r- U C mm '- H I- - N > r Ew o *k �-.0 WO O a0 cc O Qp O iL L O r UO) O ,_U) O U U Q. O M N J O ' _ J II C 05 Q^ O 2 J N N N C j Q- d to o o > OED ¢ c0 Q-O N C C N H W C -o C N (0 c[ O > m p p O < W � N 2 _* - Y N � � v N N H D w W' a) > > E m D U a) N ` L L 0 J w p U VJ p Q H p > E 2 th O Q Q W cow L. O - co O H Q U) N O (0 E E OEr- 0 W a = s_ m H .- w ti O > ccj - ou R CZ U Q � Nm > J w QQ C }, _ w 0U) O O O 025 d vi CU < _1 NI- () J Z 1,76Rd d o �om0 °) � 0 0)H G1 cn � Q O 2 Cl- c v Q Z c�i w p ' ID o O m W O V H (n" N O a p -0 p U) H 0 E ' Q Of U) Z w a _a N E coS _ ,_ Q � � ED O EBF- O ,u�i O W a - w ? H = E d N c2 ' W � 0 c E a) < W E • H Of c I- U w z 2-• "M C2 ti...-7. > < < H H W N N O Z E >> N - >+ O OQ W QQ O � wH o � H J w > m '- 2 0_N- Q v- Q O p *k L 4- -- II OM * D -Itt * 2Z < Cl * QH COeL Qcj OZ � � N "o om � N ap � Q t+ m * Qw ,, * Q ` cn _p LcoO O a QQQQ * In * * lOw CO LU H W � a. a)> Q .° o025 Q > HOHH o = H .- �nOzO J * ,_Lc) N Wn- � w1- .- W o prnQ d -- m - m m- 10 N Z Z N CC W * m N Q OC I IQ G5 2 it Ce ccA < - - - • oN2O oN - O (L � N2 rococo o2 � cn OCH 0 (L = O co 01-. 1- " " 21-L- N- H II o �- r` Q Nl� oz ON � O � N o CD p QNU) NNr2u OD Qm nNQ U) N- OOLL '- = 0 0mN Q doo a) I,- Z Q -ii-- Zo � w2 W ‘ — H HZ NU) X � N E � c �� � c HZHZZOw ,n - H comm - Wz .w in 1- HJ m � m � mW 0 - ZOo = c0w > iUmUUDDch � w cnUDp � U HZ Zm -I co omO2 .r0C@o Q�• U) Z Z m d J > 5 Z Z H Q O Y "e - p - - t� a ( O J p p p U) LLI o co• N Z Z Z W Z a Z Z O 00 M N .�7 N J H O 0225 . QQQU) ODOOH = wU) U) J ^‘� c0 _ c`> � U) III II OZ � zzzzoowo � 0000 z2Y � � J zzZ � zz2 o ; ,6 o * W' W' W' W' * * SOC * * * Of * * 0QU) � * * d toaororor wWOCU) W * H > C ) U>!) W H Q L0 Lo Lo to p } 0 CD 0 0 0 0 H N N N N N N 5o - N co V O _ N N N N N CO H I� N- N- N- N- N- 0 Q • • 0_ H a) 0_ a) c 0) 0 E U O U w Q N N ; II 0 N J 0 Ci) QJ 0 co Q a) .-. w �- M L j w o 0 coN a) Q 0 a) 2 Tti I• N W � 3 N O _ 0 c3) V ,- Q'' 0 c O 0 c cw 0 U - J d Q Q- O) Q 2 0Q �n J 0 Z 0N _, oOUO >- n c I )o CQ ccoo Q >0 aa)i `in •imp 0 p 2 a z 20 +=' N O Et LU 4 in m i, 0 -0 LU W CU a) •C Y 2 W _11-1j O O 5 O GD _0 W CO W F- Q c0 _N c J Cl_ 2 I- O. � O c~n Lira. J N COb rn � 0 � c V) (° 0 O co 0-0 CD a_ � E 00 co DUJ 121 L.0 Q 0 c � � - z a O J J � _ 0- 101 O Ec3 N a 0 00 2 2cnzz a) zo 0U) u) w z p � c < al - -0 o -I w o2ct o J J o � F- ww _ � 0 _ 0 -t m N O m 0 0 Qo LL 0_---- -t LL 0_cn U) 0-r-- z 2 2 o co � v � o 0 d °� ° ` *z > ~ rn rn *N W Q� N W Qa) Q Q W * Q(n O * * Q W * * F- W * * M �? * * cam- OJ 0 * * _, J N- N L_ S? (0 J * -*x ~ ( : * c- J 2 * r - ci) ,- * 00 d J * * 0 co Z Ce E 0 _1Qin .- � ULO.- ,- z w .- . � winv = a) �nu) �Jwwu) � r- n@� O 0 N C II Z Z (� U Lo 0- 0 Q CO cC ti 0 0 co Z •� O d > D ,- .- F- M,- O W 0 ,- O O = ct M ct 40 ct J Lu O RI' .7 W N J < "- J Q i-- 6-3 xaiccnw Orn rncm � wrn > O H °) cez = � Hcn0 0 CI N - < 1-1-1cccL � � J u) cc � (n � VW 2' � 01- 0WCCwF= 0cr � > w 7. o ( v QZ0303L -0c � w acne _I � v) OamcnJ UOcn cn z O fl- II ZU' N i D C 2 ~ W ~ - ' = CD rn0 > 0 < - `mOU) 0 00U � Omma � OW , m 2 .7- QINQ Li_ 00 - 2zZ ZrxL� OzwLNZ W = 0 (0ZCtQ � > cnZ � � I_ O .- F- w -0cn U) r OOD ° OLL ,.. i OI� � i Oli � w � OIL p00toOLLNNtn0M _ J a) J00I- F- 2 oi- Hi_ � F- F- w F- F- � IV01- F- w0- = � F- F- = pp � J II cn > J Z Z -ZZ c a Z Z > O Z Z J w Z Z = Z Z W W W J O O o O O O O o � O O o o o oI-0 z WZE zpJpzEnz _ HJ J z * Q * * QZ * * O NQ * * W Q * * Q0D * * R' QmQ * * CCW D W DQ a) I= •cw *x W' : : 27 « : () Zoo : : Wool: : ccW CL : mW' JW' .*k : Ocnacno_ cc ,c : L to L() L[) Lc) In In O O O O O O O N N N N N N N N = N () In (c) r- a II 4 « ® \ \ � ± _ U) / / / 2 0 3 $ y . e =_ ) E / 0 / / \ D 2 0 E w e r .g _2 Cl) 2 / 7 » \ f g IDM \ k ƒ > ° / \ q F / & ° E E _ _ < iii CD \ _ c o ƒ 0 = 2 g U 0 0 Cl) / % \ 'W U 0 \ 0 co o 2 - E 2 5 * co } \ \ 0 co 0 „... f \ / § / / i U (1) 0_ g ( E _ @ \ 5 g - % a P « \ .- a \ \ / / % O. « m » >- 2 w § 2 Z co / ) @ O Ca 15 2 g = o ( _ W 3 • 5 5 _, F- p - - EE \ / � / .- - � / / / < k / \ ƒ _ 7 5 a 2 . U) -JW « 0 = L° jO + � / / k $ O \ / / � / EI F \ \ ƒ � / \ tCO4Q § CD / / -jc / � % / /*� / / 00 : m a q « ± * - A = : C) - CL 5 w t / ° y / 2 / 0 R m & a \ \ O R o < � \ E § 0 : ,- 00D1_ 0,500 / $ : 2 % 2 2 k • / \ w \ ) \ ;....7„ / �/ ® ul ¥ / \ / 00 w � \ Ron , .j @ G Z \ f < - - ° « o ƒ q m < X ) E P \ 2 O & w 2 E p ƒ \ 2 0 2 _i E « � � f / 77zE0C / " bkdgE � � � / _ 0 \ / \ ƒ I % \ \ f ƒ 0/ \ $ \ / 7 00 1== z= co 4 . I- 5 7 / / \ i O / / f \ I ± o O O CI E / / -- - -- % / E / / \ _/ / / - \ Ea. \ / / / � � z / \ / / / / & O 11 21 R g & A L E- CV _J A I g m 0 O m 7500 2 / E t z U 2 2 O _ R I R m U $ 2 / _J R _J / n # 2 « t < : - 03 < < < 2 ± L - - 2 - = 2 = « _ 6 o : 2 : & 12 o : CC Et 2 O m _1 m : : : a_ m I : o e o z L0 n r r r \ / / \ \ cn 6 @ a _TD (NI & A % \ \ a & a a 1 TREE..- 4-1/16"CM/ WELLFEAD= CM/ • 1 1 28B 4111110NOTES: WELL ANGLE<70 @ 12333'*** ACTUATOR= OTIS 3-1/2"CR TBG""13-3/8-CSG SET ON EMERGENCY NTIAL KB EI_E1 63' SUPS•**PREVIOUS WELLBORES NOT SHOWN BF. ELEV= 21.28' I I KOP= 800' 2126' —3-1/2"I-ES X NIP,ID=2.813" Max Angle= 93°@ 13441' 20"CONDUCTOR H 113' DatumM)= 12394' 91.54,14.40, GAS LFT MANDRELS Datum ND 8800' 13=19124" ST 14.43 ND DEV TYPE VLV LATCH PORT DATE = 4 3937 3261 49 WAG COME RK 16 11/25/13 3 7072 5252 47 NAG DOME RK 16 11/25/13 2 9303 6742 49 14,4G DONE RK 16 11/25/13 1 11156 7976 52 14#3 SO RK 22 09/21/15 13-3/8"CSG,684,L-80,ID=12.415' —1 4327' I 5096 —19-5/8"X 7"BKR ZXP PKR ID=6.313" 9-5/8'CSG,47#,L-80 BTC-M,ID=8.681' — —5272 5118 H9-5/8"X 7"BKR HMC FLEX LOCK HGR 13=6.875" 'Minimum ID = 1.625" @ 11290' 9-5/8"MLLOUT WINDOW (11-28A)5272'-5295' 35 KB LTP w/ST1NGER ASSY I 11216' —3-1/2"FES X NIP,ID=2.813" ................../1 11237' —13-112"X 4-1/2"XO,ID=2.960" 11239 —17'X 4-1/2"BKR S-3 PKR,ID=3.875" S:( C 11243' —4-11r X 3-1/2"X0,D=2,950" I 11264' —13-112"FES X MP,D=2.813" TOP OF 2-3/8"LNR H 11297' 11290 —3-1/2"KB LTPw/STINGER ASSY,13=1.625"(9/20/15) ,.,1141 11297 —2.70"BKR DEPLOY SLV,13=2.250" I11315' —3-1/2"FES XN NP,I)=2.750" 3-1/2"TBG,9.2#,13CR VAM TOP, —I 11336' 1 11339 --I 7"X 3-1/2"UNQUE OVERSHOT BEHIND .0087 bpf,ID=2.992' _--- I 11368'J—3-1/2"X 4-112"XO,D=2.93r CT LNR 2" 3-1/ TBG STUB(03/21/06) H 11339' Vf 11370' —17"X 4-1/7 BKR S-3 PKR,13=1875' .....„........_ 11374' —14-1/2"X 3-1/2"X0,D=2.992" 11395' H3-1/2"I M XN MP,ID=2.750" 3-1/2"TBG,9.3#,L-80 BJE 8RD, — 11411' J 1r 11410' —I TOP OF BKR TEBACK SLV,ID 5.25" .0087 bpf,ID=2,992' L 0 11411' j--I3-1/2"X 4-1/2"X0,11)=2.992" BEHIND 7"LNR,29#,L-80 I-1Y D 511,ID=6,184" H 11594' CT LNR 11414' —14-1/2"'MEG, D=3.958" 4-1/2"LNR, 12.6#,L-80,.0152 bpf,I)=3.958" —1 —12210 11417' —7"X 5'BKR ZXP PKR w/LNR HGR,I)=4.375" 4-1/2"IM1PSTOCK(07/10/13) —I 12208' -., 4-1/2"MLLOUTINNDOW (1148B) 12210 -12218 PERFORATION SUR64ARY i REF LOG:SLB A.CNLJ GR/CCL ON 08/16/13 ANGLE AT TOP PERE: 91 (7, 12910' 1 —12300 —I TOP OF CEIABYT(08/15/13) Note:Refer to Roduction DB for historical perf data * . g * SIZE SFE NTERVAL Opn/Sqz SHOT SOZ ' * • - 1.56' 6 12910-13060 0 08/17/13 * . 1.56" 6 13170- 13280 0 08/17/13 * • 1.56" 6 13350- 13460 0 08/17/13 t i 1.56" 6 13675-14150 0 08/17/13 * 1.56" 6 14530-14690 0 08/17/13 t i i'Ai ill R3TD I-1 14692' 2-3./8"LM, .R,4.6#,13CR-85 TH-511, H 14730' .0039 bpf,ID=1.995" DATE REV BY CONVENTS WOE REV BY CX3I4.ENTS PRUDHOE BAY INT 07/26189 M/C44 11171AL COMPLETION 09/01/15 JMG/JM3 FULL LTRSET RSH(07/24/15) WEL: 11-28B 08/26/00 N7ES SIDETRACK 10/14/15 JTG/JMD RILL RSH&BP(9/14-15/15) PERIM No:"2130900 04/17106 MS RWO 10/14/15 JTG(14.1)GLV ao(09/17/15) API No: 50-029-21958-02 08/18/13 NORDIC 2 CTD SIDETRACK(11-28A) 10/14/15N.LW/JM3 SEF 35KB PKR(09/20/15) SEC 28,T11N,R15E 745'FSL&291'FEL 02/15/15 RM-VPJD SET BKR BP 10/14/15 KLW/J1‘13 GLV C./0(09/21/15) 03/20/15 JLS/JMYGLV C/O(03/14/15) BP Exploration(Alaska) 2 13-090 • DATA LOG201GED3 �/=.�I /.- • M K BENDER ti .GLituft,L) II BAKER PRINT DISTRIBUTION LIST NOV 0 6 2013 HUGHES AOGCC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME 11-28B z.c -oalo RUN NUMBER (mandatory) FIELD Prudhoe Bay BH SALESMAN Jesse Salyer (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: August 16,2013 TODAYS DATE: 11/04/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY D FIELD FINAL (digital il/ ADDRESS(FEDEXWILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #UI- F'KIN I S #OF COPIES #OF COPIES 1 BP Exploration(Alaska)Inc. 3 I 1 Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I I 1 I Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska I 1 I 1 I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I 1 I 1 I I I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 + 1 MAR 1 32018 5 DNR-Division of Oil&Gas I I 1 I I I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 -" TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0