Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
190-111
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, October 17, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Guy Cook P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC P-13 PRUDHOE BAY UNIT P-13 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 10/17/2023 P-13 50-029-22080-00-00 190-111-0 W SPT 8584 1901110 2146 741 743 742 742 6 75 80 74 4YRTST P Guy Cook 9/2/2023 Testing was completed using a Little Red Services pump truck and calibrated gauges. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT P-13 Inspection Date: Tubing OA Packer Depth 253 2404 2348 2335IA 45 Min 60 Min Rel Insp Num: Insp Num:mitGDC230901121103 BBL Pumped:2 BBL Returned:1.8 Tuesday, October 17, 2023 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg!� /, DATE: Wednesday, September 25, 2019 P.I. Supervisor I fgtA (�'�141 t i SUBJECT: Mechanical Integrity Tests c BP Exploration (Alaska) Inc. P-13 FROM: Matt Herrera PRUDHOE BAY UNIT P-13 Petroleum Inspector Ste: Inspector Reviewed By: P.I. SuprvJ11— NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT P- 13 Insp Num: mitMFH190924193550 Rel Insp Num: API Well Number 50-029-22080-00-00 Inspector Name: Matt Herrera Permit Number: 190-111-0 Inspection Date: 9/24/2019 Packer Depth Well P-1 3 'Type InjVD T 8584 PTD)_- i9onio tTypeTest 'Test psi 2146 ' BBL Pumped: i 2-2 --; BBL Returned: 2.1 - Interval 4YRTST P/F P Notes: IA Pressure tested to 2500 PSI Per operrator Pretest Initial 15 Min 30 Min 45 Min 60 Min ubingl 834 - _ 835 834 - 833 —I--_ �_-- IA 547 2512 ' � 2472 -- OA � 209 �� 3811 393 - 392' Wednesday, September 25, 2019 - Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg j� DATE: Tuesday,October 06,2015 P.I.Supervisor {cc ?? to(q I I cSUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC P-13 FROM: Bob Noble PRUDHOE BAY UNIT P-13 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry \161:— NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT P-13 API Well Number 50-029-22080-00-00 Inspector Name: Bob Noble Permit Number: 190-111-0 Inspection Date: 9/18/2015 Insp Num: mitRCN150919073717 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well P-13 Type Inj 1 W 'TVD j 8584 " 'Tubing 621 - 621 ' 619 - I 624 - PTD 1901110 - Type Test SPT Test psi 2146 - IA 503 2503 - 2471 2460 ' Interval INITAL 1 L-_.._.P/F / P OA490 T 667 661 652 - Notes: Post Rig Workover . Tuesday,October 06,2015 Page 1 of 1 STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMM J REPORT OF SUNDRY WELL OPERATIC...S 1 Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing lI Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other ❑ 2. Operator Name BP Exploration(Alaska),Inc 4. Well Class Before Work 5 Permit to Dnll Number 190-111 3. Address P O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 2 6. API Number 50-029-22080-00-00 7 Property Designation(Lease Number) ADL 028288 8. Well Name and Number PBU P-13 9. Logs(List logs and submit electronic and pnnted data per 20AAC25 071) 10. Field/Pools PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary p}�� ETotal Depth measured 9500' feet Plugs measured 9265'(Sand) feet ' �" t E \! D true vertical 9213' feet Junk measured None feet la L 2 8 2015 Effective Depth measured 9265' feet Packer measured 8606',8737' feet true vertical 9025' feet Packer true vertical 8475'.8584' feet O GCC Casing Length Size. MD TVD Burst Collapse Structural Conductor 80' 20"x 30" 39'-119' 39'-119' Surface 2670' 10-3/4"45.5#L-80 38'-2708' 38'-2708' 5210 2480 Intermediate Production 8997' 7-5/8"29 7#L-80 37'-9034' 37'-8832' 6890 4790 Liner 710' 5-1/2"17#L-80 8790'-9500' 8628'-9213' 7740 6280 Perforation Depth. Measured depth 9190 -9247' feet 9247'-9257' 9264'-9286' 9290'-9294' 9305'-9320' True vertical depth 8963'-9011' feet 9011'-9019' 9025'-9043' 9046'-9049' 9058'-9070' Tubing(size,grade,measured and true vertical depth) 4-1/2", 12 6#,L-80 8794' 8632' Packers and SSSV(type,measured and 7-5/8"x 4-1/2"HES TNT Packer 8606' 8475' true vertical depth) 7-5/8"x 4-1/2"Baker SAB Packer 8737' 8584' 12.Stimulation or cement squeeze summary Intervals treated(measured) Treatment descnptions including volumes used and final pressure r ° 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 0 0 0 360 100 Subsequent to operation 0 0 0 0 0 14 Attachments (required per 20 sac 25 070 25 071,&25 283) 15.Well Class after work Daily Report of Well Operations 2 Exploratory 0 Development 0 Service Il Stratigraphic 0 Copies of Logs and Surveys Run 0 16 Well Status after work Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG lI GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O Exempt 315-176 Contact Warren,Abigail M Email Abigail.Warren@bp com Pnnted Name Joe Lastuf - 0 Title Dnlling Technologist Signature A _ _. Phone +1 907 564 4091 Date 1/2.1 Ii 5 Form 10-404 Revised 5/2015 V/ ?///5 Subrat Onnmal Only P-13, Well History (Pre-Rig Workover) DATE SUMMARY T/I/O=Vac/0+/Vac, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS), pre RWO. PPPOT-T: Stung into test void (0+ psi) bled void to 0 psi. Monitored for 10 min, no increase in pressure. Functioned LDS, all moved freely. Pumped through void, good returns. Pressured void to 5,000 psi for 30 minute test, lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test void (0 psi). Monitored for 10 min, no increase in pressure. Functioned LDS, all moved freely. Pumped through void, good returns. Pressured void to 3,500 psi for 30 min test, lost 4/23/2015 100 psi in 15 minutes, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. T/I/O= SSV/40/Vac. Temp= SI. IA FL (SL request). No AL. IA FL near surface. SV, WV& SSV=C. 5/9/2015 MV=O. IA& OA=OTG. 0115 hrs. RUN 2.2"CENT, 5'x 1-1/4"STEM, 2-7/8" BLB & BULL NOSE, PASS THRU REDUING NIPPLE @ 8750'SLM/8776' MD, BRUSH THRU NIPPLE STOP @ 8800' SLM, LRS LOAD TUBE 160 BBLS DIESEL. SET 2.313"XX PLUG ( 2 x 3/16 eqz ports, OaI=23") IN NIPPLE REDUCER @ 8776' MD. 5/10/2015 LRS PERFORMING MIT-T TO 3000 PSI, S RISER GAINING PRESSURE. CALL GREASE CREW. T/I/0=56/46/0. Temp=SI Assist SL Load and Test. [Obj: Pre RWO]. Loaded TBG with 3 bbls 5/10/2015 methanol and 160 bbls dsl. Attempted to pressure up TBG for MIT, WV leaking by, call grease crew. MIT-T to 3000 psi ***PASSED*** Pumped 5 bbls diesel down TBG to reach test pressure. MIT-IA to 4000 psi ***PASSED*** Pumped 7 bbl Diesel Into IA to Reach Test Pressure, RDMO,SL In control 5/11/2015 of well Upon Departure. GREASE CREW SERVICE TREE/WING, LRS ATTEMPT MIT-T, TUBE UP TO 2700 PSI, S RISER IS LEAKING BY PRESSURE UP TO 2500 PSI, PLACE HEATER ON WING. LRS MIT-T T 3027 PSI (see Irs log) GOOD TEST. LRS R/U TO IA, MIT-IA TO 4000 PSI, LRS PERFORMED PASSING MIT-IA TO 4,000psi (see Irs wsr). PULL UPPER BAKER STRADDLE PATCH FROM 6779' ELM. TAG TOP OF PATCH W/ KJ, 3.75" CENT, 3' 1-7/8" STEM, 3.80" CENT, 3.70" LIB @ 6942' ELM 5/11/2015 (impression of patch). MADE 2 ATTEMPTS TO PULL 4-1/2" BAKER STRADDLE PATCH @ 6,912' SLM /6,942' ELM. PULLED 4-1/2" BAKER STRADDLE PATCH FROM 6,912' SLM/6,942' ELM. ***LEFT ONE COMPLETE RUBBER ELEMENT IN HOLE***. RAN 4-1/2" BRUSH, 3.74" 3 PRONG WIRE GRAB TO 4-1/2" HES PERM PATCH @ 8,623' SLM /8,661' ELM (no recovery). RAN 20'x 3.00" BAILER, 3.18"ADJUSTABLE CENTRALZIER, 3.00" BLIND BOX TO 8,720' SLM (had to work through patch 5/12/2015 issues). WELL SHUT IN ON ARRIVAL. RIG UP E-LINE. PUNCH TUBING FROM 8685'-8687'. RIH WITH 5/31/2015 RCT. CUT TUBING WITH RCT 2500-200 (E-LINE). CUT TUBING AT 8713' (recovered missing element from patch in bow spring). PERFORM GAMMA CORRELATION OVER TUBING CUT FROM 8730' 6/1/2015 TO 8500'. T/I/O=40/29/0. CMIT TxIA to 4000 psi failed. (Pre RWO) Pumped 9 bbls dsl down tbg to reach test pressure on TxIA. Test#1 15 min TxIA lost 67/48 30 min TxIA lost 42/40. Total loss TxIA in 30 mins 109/88. Bump back to test pressure. Test#2 15 min TxIA lost 44/42 30 min TxIA lost 32/34. Total loss in 30 mins TxIA 76/76. Bump back to test pressure. Test#3 15 min TxIA lost 33/32 30 min TxIA lost 25/30. Total TxIA loss in 30 mins 58/62. Bump back to test pressure. Test#4 15 min TxIA lost 31/31 30 min TxIA lost 26/29 45 min TxIA lost 27/28. Total TxIA loss in 45 min 84/88. Bleed TxIA back to 500 psi. Repressure TxIA with 7.6 bbls dsl. Test#5 and test#6 FAILED (see mit data). Move into circ-out. Pumped 3 bbls neat folloed by 537 bbls 1% kcl down tbg taking returns up 6/12/2015 IA and into P-12 FL Pump 120 bbls dsl down tbg U=TUBE. Finish u-tubing well CMIT TXIA to 4000 PASSED on second try(see mit data) bleed well to 300 rig down (swab closed wing closed ssv closed master open annulus valves open to gauges) tags hung 6/13/2015 on IA and wing placard on well FWHP=302/283/0. P-13, Well History (Pre-Rig Workover) T/I/O = NA/7/0. Temp = SI. MIT-OA PASSED to 1200 psi (Pre RIG). Wellhouse, scaffold &flowline removed. OA FL @ 50' (1.8 bbls). Pumped 3 bbls of Diesel to reach a test pressure of 1200 psi. OAP lost 66 psi in the 1st 15 min & 12 psi in the 2nd 15 min for a total loss of 78 psi in 30 min. Bled OAP from 1132 psi to 0 psi (0.6 bbls). Final WHPs = NA/7/0. SV, WV, SSV, MV= C. IA, OA= 6/15/2015 OTG. 2359 hrs. TWO =TWC/250/0. PT'd Dryhole tree to API specs. (PASSED). NU IA Piggy Back#96 . Torqued and PT'd to API specs. (PASSED). RDMO. Final WHP's=TWC/0/0. Fluid packed annulas watch for 6/20/2015 _thermal expansion. T/I/O=Vac/5/0. Pre Doyon 16. Set 4" TWC#291, N/U Dryhole Temp#17. Final WHP's 250/250/0. 6/20/2015 _Note: Tree and wellbore and annulus is fluid packed. T/I/O=TWC/0/0. Pre Doyon 16. Install temp#43 as OA piggyback. Final WHP's TWC/0/0. Tree, 6/21/2015 wellbore and annulus is fluid packed. North America-ALASKA-BP Page 1 of 8 Operation Summary Report Common Well Name:P-13 AFE No Event Type:WORKOVER(WO) Start Date:6/26/2015 End Date:7/2/2015 X4-011JC-E:(1,800.000.00) 1 i Project:Prudhoe Bay Site:PB P Pad Rig Name/No.:DOYON 16 I Spud Date/Time:8/28/1990 12:00:00AM Rig Release:7/2/2015 Rig Contractor DOYON DRILLING INC. UWI:500292208000 Active datum:P-13 @91.83usft(above Mean Sea Level) Date From-To i Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/26/2015 18:00 - 20:30 ' 2.50 MOB P PRE PJSM.BRIDLE UP.INSTALL GOOSE NECK 20:30 - 21:00 I 0.50 MOB P PRE PJSM.LAY OVER DERRICK -CHAIN DOWN DERRICK AND CHAIN ON HEADACHE RACK. 1 21:00 - 23:00 2.00 MOB P PRE PJSM.INSTALL FRONT BOOSTER. 1-REMOVE 13-5/8"X 13-5/8"SPOOL FROM i BOPE STACK -INSTALL 13-5/8"X 11"SPOOL ON BOPE. REMOVE CHOKE HOSE. -SET BOPE ON TRAVELING CRADLE. j- INSTALL REAR BOOSTER. 23:00 - 00:00 1.00 ' MOB N WAIT PRE !WAIT ON RIG MATS. 6/27/2015 00:00 - 03:00 , 3.00 MOB N WAIT PRE ,WAIT ON RIG MATS. I I I -CHANGE OUT SKATE HYDRAULIC KICKER RAM. 103:00 - 06:00 3.00 MOB P PRE MOVE RIG FROM R-PAD ONTO R-PAD ACCESS ROAD. 06:00 - 08:00 3.00 MOB P • PRE MOVE RIG DOWN SPINE ROAD TOWARDS P-PAD ACCESS ROAD. 09:00 - 00:00 15.00 MOB -P - PRE MOVE RIG DOWN P-PAD ACCESS ROAD. 6/28/2015 ,00:00 - 01:00 1.00 MOB ` P PRE MOVE RIG ONTO P-PAD. - I 01:00 - 03:00 2.O1:1- MOB t P PRE .PJSM.SPOT RIG OVER P-13. PAD OPERATOR NOTIFIED. j I-WSLAND TOUR PUSHER PRESENT FOR SPOTTING RIG OVER WELL. 03:00 - 05:00 2.00 RIGU P PRE PJSM.RAISE DERRICK. -SPOT MUD PUMP#2. -R/U HARDLINE FROM FLOWBACK TANK TO I RIG. 05:00 - 06:00 l 1.00 RIGU P PRE ,TAKE ON 8.5 PPG BRINE. 1 I -PREPARE CELLAR FOR PRESSURE TESTING TWC. ;ACCEPT DOYON 16 AT 05:00 HRS ON ' 06/28/2015 0600 - 07:30 1.50 RIGU P PRE PT TWC FROM ABOVE AND BELOW 250/4000 PSI FOR 5 MINS-PASS 07:30 - 08:00 0.50 RIGU i P PRE !RIG EVACUATION DRILL. I I CONDUCT RIG EVACUATION DRILL, FOLLOWED BYAAR. I'ALL RIG CREW MEMBERS AND 3RD PARTY _ IREPORTED TO SAFE BRIEFING AREA 08:00 - 14:00 6.00 RIGU P PRE ND DRY HOLE TREE AND ADAPTER FLANGE -ATTEMPT TO FREE ADAPTER FLANGE BOLTS -APPLY STEAM HEAT TO ADAPTER FLANGE -FREE ADAPTER FLANGE WITH FMC FLANGE I SPLITTER -L/D DRY HOLE TREE AND FLANGE SPLITTER,REMOVE FROM CELLAR -CLEAN UP AND INSPECT TUBING HANGER ,HEAD I -- 'VERIFY 9-1/2 TURNS ON 4.5"TDS X-O. Printed 7/14/2015 11:46:46AM North America-ALASKA-BP Page 2 of 8 Operation Summary Report Common Well Name:P-13 AFE No Event Type:WORKOVER(WO) Start Date:6/26/2015 End Date:7/2/2015 X4-011 JC-E:(1,800000.00) Project:Prudhoe Bay Site:PB P Pad Rig Name/No.:DOYON 16 Spud Date/Time:8/28/1990 12:00:00AM Rig Release:7/2/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292208000 Active datum:P-13(g291.83usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 15:30 1.50 RIGU P I PRE NU 11 X 13-5/8"ADAPTER/SPACER SPOOL AND BOPE -HOLD PJSM RAM CONFIGURATION=UPPER AND LOWER 3-1/2"X 6"VBRS 15:30 - 21:30 6.00 BOPSUR P PRE PJSM.TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -TEST ANNULAR WITH 4"TEST JOINT TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST UPPER 3-1/7 X 6"VBR RAMS WITH 4" ' LAND 4-1/2"TEST JOINT TO 250 PSI,4,000 PSI HIGH FOR 5 CHARTED MINUTES. -TEST LOWER 3-1/2"X 6"VBR RAMS WITH 4" AND 4-1/2"TEST JOINT TO 250 PSI,4,000 PSI HIGH FOR 5 CHARTED MINUTES. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,4,000 PSI HIGH FOR 5 CHARTED MINUTES. PERFORM ACCUMULATOR DRAW DOWN TEST WITH WSL PRESENT. ;-NO FAILURES. !-BOB NOBLE OF AOGCC WAIVED WITNESS TO BOPE TEST. 21:30 - 23:00 1.50 RIGU P PRE RD TEST EQUIPMENT,RU CIRC MANIFOLD IN CELLAR,RU DUTCH RISER 23:00 - 00:00 1.00 RIGU P PRE PULL TWC WITH TESTED LUBRICATOR -HOLD PJSM -RIG UP LUBRICATOR AND PT 250 PSI LOW/ 3500 PSI HIGH -PULL TWC AND VERIFY 0 PSI ON TUBING RIG DOWN LUBRICATOR 'FLUID LOSS TO WELL PAST(24)HOURS=0 1 BBLS 8.5 PPG BRINE. OA=OPSI. 6/29/2015 00:00 - 00:30 0.50 RIGU P PRE PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. PJSM.PULL DUTCH RISER AND UD. 00:30 - 01:30 1.00 RIGU P PRE PJSM.PRESSURE TEST SURFACE LINES. REVIEW PRESSURE CROSSCHECK LIST 1 WITH CREW. -PRESSURE TEST LINES TO 250 PSI LOW, 4,000 PSI HIGH FOR(5)MINUTES.GOOD TEST. Printed 7/14/2015 11:46:46AM • North America-ALASKA-BP Page 3 of 8 Operation Summary Report Common Well Name:P-13 AFE No Event Type:WORKOVER(WO) i Start Date:6/26/2015 End Date:7/2/2015 X4-011JC-E:(1,800,000.00) Project:Prudhoe Bay Site:PB P Pad Rig Name/No.:DOYON 16 Spud Date/Time:8/28/1990 12:00:00AM Rig Release:7/2/2015 Rig Contractor DOYON DRILLING INC. _ U1M:500292208000 - Active datum:P-13 @91.83usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 03:00 1.50 I RIGU P PRE PJSM.CIRCULATE OUT DIESEL FREEZE PROTECT. -PUMP 65 BBLS 8.5 PPG BRINE DOWN IA, TAKING RETURNS UP TUBING.PUMP AT 5 BPM=730 PSI. -PUMP 135 BBLS 8.5 PPG BRINE DOWN TUBING,TAKING RETURNS UP IA.PUMP AT 5 BPM=320 PSI. I-CIRCULATE UNTIL CLEAN 8.5 PPG BRINE SEEN AT SURFACE. -SHUT DOWN AND MONITOR WELL FOR(10) LMINUTES.WELL STATIC. 03:00 - 04:30 1.50 RIGU P PRE PJSM.PERFORM CMIT-IAXT. -PRESSURE TEST TO 250 PSI LOW,4,000 PSI HIGH FOR(30)CHARTED MINUTES.PASSES BP TESTING CRITERIA. 04:30 - 05:30 1.00 RIGU P PRE BLOW DOWN SURFACE LINES. i -R/D KILL MANIFOLD IN CELLAR. -MOBILIZE SLB SPOOLER TO RIG FLOOR. 05:30 - 06:30 1.00 PULL P DECOMP PJSM.PULL HANGER TO RIG FLOOR. I-PUW=138K,SOW=125K,CAME FREE AT i 1190K 06:30 - 07:30 1.00 PULL ` P - DECOMP CIRCULATE BOTTOMS UP THROUGH MGS .-6 BPM AT 320 PSI -ACQUIRE SLOW CIRCULATING RATES I -PERFORM 10 MINUTE NO FLOW CHECK- GOOD 07:30 - 09:00 1.50 PULL R' , DECOMP I LAY DOWN TUBING HANGER AND LANDING JOINT,TERMINATE CONTROL LINES,MU FOSV,PUMP 10 BBL DRY JOB 2.50 PULL ,P DECOMP 09 00 PULL AND LAY DOWN 4-1/2"TDS 11:30 COMPLETION FROM 8713'TO 6642'TO SSSV -RIG DOWN SPOOLERS -RECOVER 26 CANNON CLAMPS AND 4 • STAINLESS STEEL BANDS. 11:30 - 12:00 0.50 PULL P DECOMP PULL AND LAY DOWN 4-1/2"TDS •COMPLETION FROM 6642'TO 6600' i -PUW=110K,SOW=109K 12:00 - 12:30 0.50 PULL i P DECOMP SERVICE AND INSPECT TOP DRIVE AND LUBRICATE RIG EQUIPMENT 12:30 - 18:00 5.50 PULL P DECOMP PJSM,LAY DOWN COMPLETION FROM 6600' TO SURFACE j -LAYED DOWN 215 JNTS AND 5 GLMS -RCT CUT NOT FLARED,2-1/2'STUB WITH ' 4-1/2"OD 1 -CHECK TUBING STUB IN UNIQUE ' OVERSHOT-GOOD 18.00 - 19:30 1.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR,MU FMC PACK OFF PULLING TOOL,VAC OUT STACK Printed 7/14/2015 11:46:46AM North America-ALASKA-BP Page 4 of 8 Operation Summary Report Common Well Name:P-13 AFE No Event Type:WORKOVER(WO) Start Date:6/26/2015 End Date:7/2/2015 X4-011 JC-E:(1,800,000.00) Project:Prudhoe Bay Site:PB P Pad Rig Name/No.:DOYON 16 Spud Date/Time:8/28/1990 12:00:OOAM Rig Release:7/2/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292208000 Active datum:P-13©91.83usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 22:30 3.00 PULL P DECOMP PJSM,RIH WITH FMC PACK OFF PULLING TOOL -SET DOWN 2K ON CASING HANGER WITH PACK OFF PULLING TOOL,LOOSEN GLAND I NUTS,BACK OUT 2 LOCK DOWN SCREWS, OBSERVED A DECREASE IN WEIGHT AT SURFACE OF 1K,INDICATING THE CASING MAY BE GROWING,LDS AND GLAND NUTS WERE DIFFICULT TO FREE. -FMC RECOMMENDS TO RUN LOCK DOWN SCREWS BACK IN AND RETEST PACK OFF, CONFER WITH ODE AND DECIDE NOT TO PULL PACK OFF -SET DOWN 10 K ON CASING HANGER WITH 'PACK OFF PULLING TOOL AND RUN LOCK DOWN SCREWS BACK IN AND TIGHTEN GLAND NUTS POH WITH PACK OFF PULLING TOOL, PPPOT-IC TO 3500 PSI FOR 30 MINS-GOOD TEST 22:30 - 23:00 0.50 RUNCOM P RUNCMP RIG UP EQUIPMENT TO RUN COMPLETION -MOBILIZE HANDLING EQUIPMENT AND POWER TONGS FOR TORQUE TURN TO RIG FLOOR 23:00 - 00:00 1.00 RUNCOM ' P RUNCMP PJSM,MU AND RIH WITH 4-1/2"12.6#TC-II COMPLETION -VERIFY RHC PLUG BODY IN X NIPPLE#1 BELOW PACKER -MU AND RIH WITH 7-5/8"X 4-1/2"HES TNT PACKER AND TAILPIPE ASSY -RABBIT 4-1/2"TUBING WITH 3.883"OD DRIFT -USE TORQUE TURN FOR ALL CONNECTIONS,TORQUE TO 3800 FT-LBS -BAKER-LOC ALL CONNECTIONS BELOW PACKER -USE JET LUBE SEAL GUARD THREAD COMPOUND ON ALL CONNECTIONS ABOVE PACKER -INSPECTALLTHREADS,CLEAN IF NECESSARY FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 8.5 PPG BRINE. OA=0 PSI. Printed 7/14/2015 11:46:46AM • North America-ALASKA-BP Page 5 of 8 Operation Summary Report Common Well Name:P-13 AFE No Event Type:WORKOVER(WO) Start Date:6/26/2015 End Date:7/2/2015 X4-011JC-E:(1,800,000.00) Project:Prudhoe Bay Site:PB P Pad Rig Name/No.:DOYON 16 Spud Date/Time:8/28/1990 12:00:OOAM Rig Release:7/2/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292208000 Active datum:P-13©91.83usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) - 6/30/2015 00:00 - 13:00 13.00 RUNCOM P RUNCMP PJSM,MU AND RIH WITH 4-1/2"12.6#TC-II COMPLETION -RABBIT 4-1/2"TUBING WITH 3.883"OD DRIFT -USE TORQUE TURN FOR ALL CONNECTIONS,TORQUE TO 3800 FT-LBS USE JET LUBE SEAL GUARD THREAD COMPOUND ON ALL CONNECTIONS ABOVE PACKER -INSPECTALLTHREADS,CLEAN IF NECESSARY -FROM 126'MD TO 8,707'MD,TAG AT 8,707' MD SET DOWN 30 KLBS,UNABLE TO ENGAGE OVERSHOT. -WORK AND ROTATE PIPE,STILL UNABLE TO ENGAGE OVERSHOT. M/U TOP DRIVE AND PUMP AT 1 BPM=30 PSI,RIH AND NOTE SHEAR PINS SHEAR AT 4' 1 IN AND 6'IN BOTH TAKING 8 KLBS TO SHEAR. -GO TO NO-GO AND SET DOWN 25 KLBS TO VERIFY. 13:00 - 15:00 2.00 RUNCOM P RUNCMP PJSM.LAND FMC 11 X 4-1/2"TUBING HANGER. CALCULATE SPACE OUT,VERIFY WITH WSL, •HES REP AND TOOLPUSHER. P/U 3.80'PUP FOR SPACE OUT. -FMC M/U HANGER AND INSPECT. -P/U LANDING JOINT,DRAIN BOPE STACK. -RIH AND PUMP AT 1 BPM=30 PSI,LAND HANGER.FINAL PUW=137 KLBS,SOW=131 KLBS. 15:00 - 21:00 6.00 RUNCOM P RUNCMP PJSM.FREEZE PROTECT WITH LRS. -SPOT LRS AND R/U LINES TO CELLAR. -PRESSURE TEST LINES TO 250 PSI LOW, 3,900 PSI HIGH.GOOD TEST. -ATTEMPT TO PUMP DIESEL DOWN IA,PUMP AT 0.25 BPM=800 PSI. -SHUT DOWN,CALL HES TO VERIFY MAX PRESSURE,1,200 PSI. -ATTEMPT TO PUMP DIESEL DOWN IA,PUMP AT 0.5 BPM=1,200 PSI. -ESTABLISH CIRCULATION DOWN TUBING AT 3 BPM=240 PSI,NO ISSUES AND FULL RETURNS. -P/U LANDING JOINT. -FMC BOLDS. -UNSEAT HANGER AND PUMP DOWN IAAT4 BPM=675 BPM. -ALLOW DIESEL TO U-TUBE BETWEEN TUBING AND IA. -DISCUSS WITH ODE THE HIGH CIRCULATING PRESSURES WHILE FREEZE PROTECTING.DECISION MADE TO SET PACKER WHILE RIG IS OVER WELL. 21:00 - 23:30 2.50 RUNCOM C RUNCMP BRINE TRUCK ARRIVES ON LOCATION -SPOT IN VAC TRUCK,RU TO ROCK OUT DIESEL FREEZE PROTECT THROUGH CELLAR MANIFOLD Printed 7/14/2015 11:46:46AM • North America-ALASKA-BP Page 6 of 8 Operation Summary Report Common Well Name:P-13 AFE No Event Type:WORKOVER(WO) Start Date:6/26/2015 End Date:7/2/2015 X4-011JC-E:(1,800,000.00) Project:Prudhoe Bay Site:PB P Pad Rig Name/No.:DOYON 16 Spud Date/Time:8/28/1990 12:00:00AM I Rig Release:7/2/2015 Rig Contractor:DOYON DRILLING INC. I UWI:500292208000 Active datum:P-13©91.83usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ! Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 RUNCOM C RUNCMP !PJSM.CONTINUE TO RU FOR CIRCULATING OUT DIESEL FREEZE PROTECT. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 8.5 PPG BRINE. OA=0 PSI. 7/1/2015 00:00 - 01:00 1.00 RUNCOM C RUNCMP !CIRCULATE OUT DIESEL FREEZE PROTECT. E-PUMP 35 BBLS 8.5 PPG BRINE DOWN IA, TAKING RETURNS UP TUBING.PUMP AT 4 BPM=790 PSI. -PUMP 58 BBLS 8.5 PPG BRINE DOWN TUBING,TAKING RETURNS UP IA.PUMP AT 5 BPM=800 PSI. -CIRCULATE UNTIL CLEAN 8.5 PPG BRINE ,SEEN AT SURFACE. -SHUT DOWN AND MONITOR WELL FOR(10) MINUTES.WELL STATIC. 01:00 - 02:00 1.00 RUNCOM C RUNCMP PJSM,PUMP 290 BBLS OF CORROSION INHIBITED KCL DOWN IA,TAKING RETURNS OUT THE TUBING -KCL PUMPED AT 4 BPM AT 750 PSI 02:00 - 04:30 2.50 RUNCOM C RUNCMP LPJSM.FREEZE PROTECT WITH LRS. PUMP DIESEL DOWN IA AT 4 BPM=770 PSI ALLOW DIESEL TO U-TUBE BETWEEN TUBING AND IA FOR 1 HOUR 04:30 - 05:00 0.50 • RUNCOM C RUNCMP RIG UP LINES FOR SETTING PACKER, PREPARE TO LAND TUBING HANGER 05:00 - 06:30 1.50 RUNCOM X DPRB RUNCMP LAND TUBING HANGER: OBSERVE TUBNG TAKING WT APPROXIMATELY 1'FROM BEING LANDED. '-RIG UP LITTLE RED TO PUMP DIESEL DOWN I ( TUBING AND PUMP @.8 BPM/20 PSI. -ATTEMPT TO LAND HANGER SEVERAL TIMES,STILL TAKING 5-7K ABOUT A FOOT IBEFORE LANDING OUT. - NOTIFY TOWN ODE AND LAND HANGER, 1 RILDS. 06:30 - 07:30 1.00 RUNCOM X DPRB� i RUNCMP j PJSM.ALLOW DIESEL TO UTUBE INTO I/A FROM PREVIOUS OPERATION. 07:30 - 10:00 2.50 RUNCOM X DPRB ' RUNCMP LAY DOWN LANDING JT. -W/APPROXIMATELY 10K,BROKE j CONNECTION ON LANDING JT. -BACKED OUT AT 4 1/2"IF CONNECTION. MAKE UP LANDING JT. -PULL HANGER TO FLOOR AND ATTEMPT TO BREAK OUT 4 1/2"TCII CROSS OVER. •-APPLY 17K FT/LBS OF LEFT HAND TORQUE I ' SEEING INCREASE IN TORQUE TO BREAK OUT CROSSOVER. -STOP OPS,NOTIFY TOWN,LAY DOWN j HANGER WITH PUP AND CROSSOVER, t I ORDER OUT NEW HANGER. 10:00 - 12:00 2.00 RUNCOM ! X DPRB RUNCMP WAIT ON NEW TUBING HANGER TO BE MADE READY. -LOSSES TO WELL BORE LAST(12)HRS=0 BBLS. -0/A=10 PSI. 12:00 - 15:00 3.00 RUNCOM X DPRB RUNCMP CONTINUE TO WAIT ON NEW TUBING HANGER W/PUP JT. -LUBRICATE AND INSPECT RIG EQUIPMENT, I PERFORM SPCC CHECKS. • Printed 7/14/2015 11:46:46AM North America-ALASKA-BP Page 7 of 8 Operation Summary Report Common Wet Name:P-13 AFE No Event Type:WORKOVER(WO) Start Date:6/26/2015 End Date:7/2/2015 X4-011JC-E:(1,800,000.00) Project:Prudhoe Bay Site:PB P Pad Rig Name/No.:DOYON 16 Spud Date/Time:8/28/1990 12:00:00AM Rig Release:7/2/2015 Rig Contractor DOYON DRILLING INC. UWI:500292208000 Active datum:P-13©91.83usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 16:00 1.00 RUNCOM X DPRB RUNCMP PJSM.DRIFT HANGER AND PUP.MAKE UP W/ TORQUE TURN. -MAKE UP CROSSOVER AND LANDING JT. 137K UP WT,131K DOWN WT. LAND HANGER,DID NOT SEE TOP OF TUBING STUB. ! I OBSERVED TAKING WT,5-7K BEFORE 'LANDING HANGER. -LAND HANGER,RILDS. 16:00 - 20:30 4.50 RUNCOM C RUNCMP PJSM,SET HES TNT PACKER PU TC-11 LANDING JOINT,DROP BALL AND ROD -CANNOT PRESSURE UP FOR LOW TEST, REVERSE CIRCULATE TO CLEAN UP BALL SEAT-SUCCESSFUL,ABLE TO CATCH I PRESSURE WHEN PUMPING DOWN TUBING MIT-T,250 PSI LOW/4000 PSI HIGH FOR 30 CHARTED MINS-PASS,LOST 40 PSI IN THE FIRST 15 MINS,AND 10 PSI IN THE SECOND 15 MINS. TOOK 2.3 BBLS TO REACH TEST PRESSURE,BLEED TUBING TO 1500 PSI(1.5 BBLS). -SEE INDICATION OF PACKER SHEAR AT 1900 PSI WHILE PRESSURING UP TUBING -MIT-IA,250 PSI LOW/4000 PSI HIGH FOR 30 CHARTED MINS-PASS,LOST 35 PSI IN THE FIRST 15 MINS,AND 15 PSI IN THE SECOND 15 MINS. TOOK 4.3 BBLS TO REACH TEST PRESSURE,BLED BACK 4.3 BBLS WTL NOTIFIED OF RESULTS AND PERMISSON GRANTED TO PROCEED AHEAD. "AOGCC WITNESSED TEST WAIVED BY JOHN CRISP 20:30 - 23:00 2.50 RUNCOM P RUNCMP DRY ROD IN TWC 1-ATTEMPT TO TEST TWC,CANNOT I PRESSURE UP,WALK OUT LINE-UP, TROUBLESHOOT VALVES TEST TWC FROM ABOVE 250 PSI LOW/3500 PSI HIGH FOR 5 CHARTED MINUTES-PASS 23:00 00:00 1.00 RUNCOM P RUNCMP PJSM,BREAK DOWN CELLAR CIRC MANIFOLD LINES,FLUSH BOPS W/FRESH WATER,BLOW DOWN TOP DRIVE FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 8.5 PPG BRINE. OA=0 PSI. 7/2/2015 00:00 - 01:00 1.00 BOPSUR P RUNCMP BREAK DOWN HOLE FILL,CHOKE LINE,MUD PUMP,FUNCTION RAMS,DRAIN STACK 01:00 - 02:00 1.00 BOPSUR -tPUMP, RUNCMP PJSM,ND BOPS 102:00 - 03:30 1.50 WHSUR P RUNCMP PJSM,FMC INSPECT HANGER,NU 11"5K X 4-1/16"5K ADAPTER FLANGE AND DRY HOLE 'TREE 03:30 - 04:30 1.00 , WHSUR P RUNCMP PRESSURE TEST(PPPOT-T)TUBING HANGER •VOID AND SEALS TO 5K FOR 30 CHARTED MINUTES-PASS 04:30 05:30 1.00 WHSUR P RUNCMP PJSM,PRESSURE TEST TREE 250 PSI LOW/ 5000 PSI HIGH VISUAL LEAK TIGHT TEST Printed 7/14/2015 11:46:46AM North America-ALASKA-BP Page 8 of 8 Operation Summary Report Common Wet Name:P-13 AFE No Event Type:WORKOVER(WO) Start Date:6/26/2015 End Date:7/2/2015 X4-011JC-E:(1,800.000.00) Project:Prudhoe Bay Site:PB P Pad Rig Name/No.:DOYON 16 Spud Date/Time:8/28/1990 12:00:00AM Rig Release:7/2/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292208000 Alive datum:P-13©91.83usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 06:00 0.50 RIGD I P RUNCMP I PJSM.MOVE RIG OFF WELL P-13. -PAD OPERATOR NOTIFIED. -WSL PRESENT FOR PULLING RIG OFF WELL RIG RELEASE AT 06:00 HRS ON 07/02/2015 Printed 7/14/2015 11:46:46AM TREE=* CIW4-1/16" — D S. f NOTES:112S READINGS GE 125 ppm IACTUATOR AR= OT1S= FMC U —1 3 WHENON MI WELL REQUIRES A SSSSV WHEN ON ACTUATOR OKB.ELEV= 92' BE B.EV= 54.78' 2 111 KOP= 6883' 2143' �a-12"FES X NP,D-3.813" l Max Angle= 38'@ 9378' _"CONDUCTOR, — Datum MD= 9105' _#, , Datum TV D= 8800'SS p= - 4 10-314"CSG,45.5#,L80 BUTT,D=9.950" —{ 2708' / Minimum ID = 3.725" @ 8776' , r f 8576' 14-1/2"HES X NP,D=3.813" 4-1/2" OTIS XN NIPPLE Z 8606' H7-5/8"x 4-1/2"FES TNT NKR,D=3.856" I I 8641' --14-1/2"FES X NP.D=3.813" 4-1/2"TBG,12.6#,L-80 TCI, H 8712' 1 _f 8726' H 7-5/8 X 4-1/2'UNIQUE OVERSHOT .0152 bpf,D=3.958' I/' 8726' H4-1/2"PKR S WS Nom,D=3.813" L4_1/2"TUBING STUB(06/01/152. 19' 8736' -K-22 ANCHOR SEAL ASSY 8737' H7-5/8"X 4-1/2"BKR SAB PKR,D=4.0' 8741' H5-1/2'MLLOUT EXTENSION,D=4.75" 874T —15-12"x 4-1/2"XO,D=4.0" 8755' H4-12'PKR SWS NP,D=3.813" 8776' H4-1/2"OTIS XN NP,D=3.725' 4-112'TBG, 12.6#,L-80,.0152 bpf,D=3.958' —I 8787' TOP OF 5-1/2"BKR Lf 2,—{ 8790' t 8794' —15-12"XO BKR SEAL ASSY W/O SEALS 8788' H B.MD TT LOGGED 07/11/91 7-5/8"CSG,29.7#,L-80 NSCC,D=6.875" —{ 9033' L. PERFORATION SUMMIARY 9084' —{MARKER JOINT REF LOG:ATLAS BHCA ON 09/11/90 ANGLE AT TOP PERF:33'@ 9190' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE SOZ 3-3/8" 6 9190-9247 0 04/07/91 9265' --ICARBOLfTE SANDBACK PLUG(11/03/95) 3-3/8" 4 9247-9257 0 12/15/91 3-3/8' 4 9264-9286 C 11/03/95 3-3/8" 4 9290-9294 C 11/03/95 3-3/8" 4 9305-9320 C 11/03/95 PBTD --j 9419' —\7:47.-47:47.-*,-.4. Wit;; 5-1/7 LNR, 17#,L-80 FL4S,.0232 bpf,D=4.892" — 9500' Ak DATE REV BY COA 1TS DATE REV BY COMMENTS PRUDHOE BAY MKT 11/21/90 AUDI#2 ORIGINAL COMPLETION WELL: P-13 07/02/15 0-16 RWO PBZIu1T No: '1901110 07/06/15 JMD DRLG HO C ORRECT1ONS API No: 50-029-22080-00 07/09/15 SM/JMD FINAL ODE APPROVAL SEC 31,T11N,R13E 2496'FSL&2171'FWL 0727/15_ JL/JMD PULL RED NR'XX PLUG BP Exploration(Alaska) pet( P - (3 prb <<1Oka Regg, James B (DOA) From: Regg, James B (DOA) a—,, /1616- Sent: Monday, July 06, 2015 10:19 AM To: Disbrow,Jack Cc: AK, D&C Rig 16 Well Site Leader;Wallace, Chris D (DOA); Brooks, Phoebe L(DOA); DOA AOGCC Prudhoe Bay Subject: RE: P-13 (PTD #1901110) MIT-T, MIT-IA Attachments: MIT PBU P-13 7-1-15 rev.xlsx Packer TVD is 8584 ft; revised report attached Jim Regg Supervisor, Inspections VIED AOGCC s(,(� 333 W.7th Ave,Suite 100 Anchorage,AK 99501 907-793-1236 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information. The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 907- 793-1236 or jim.regg@alaska.gov. From: Disbrow, Jack [mailto:Jack.Disbrow@bp.com] Sent: Sunday, July 05, 2015 12:56 AM To: Wallace, Chris D (DOA) Cc: Regg, James B (DOA); AK, D&C Rig 16 Well Site Leader Subject: P-13 (PTD #1901110) MIT-T, MIT-IA Chris, The 10-426 is attached for injector P-13 (PTD#19001110), MIT-IA and MIT-T performed on Rig Doyon-16 post tubing swap rig work over. Thank you, Jack Disbrow D16 WSL 659-4177 1 ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submit to jim regg(rDalaska goy AOGCC.Inspectors@alaska cloy phoebe brooks] alaska qov chns wallace@alaska.gov OPERATOR: BPXAZ0 1((14 1 S FIELD/UNIT/PAD: GPB/Prudhoe Bay/P Pad DATE: 07/01/15 OPERATOR REP: Jack Disbrow AOGCC REP: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well P-13 - Type In) N TVD _ ' 8,584' Tubing 250 '4,160 4,120 4,110 Interval 1 P T D 1901110- Type test P Test psi " 2146 Casing - P/F P Notes: MIT-T ' OA 0 0 0 0 Witnessed waived by John Crisp Well P-13 - Type In) N - TVD ' 8,584' Tubing 1,500 " 2,225 -2,225 '2,225 Interval 1 P T D 1901110 - Type test P Test psi - 2146 Casing 330 4,150 4,115 4,100 P/F P '' Notes: MIT-IA OA 0 0 0 0 Witness waived by John Cnsp Well Type In) TVD Tubing Interval P T D Type test Test psi Casing P/F Notes: OA Well Type Inj TVD Tubing Interval - P T D Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P T D Type test Test psi Casing P/F Notes: OA TYPE INJ Codes TYPE TEST Codes INTERVAL Codes D=Drilling Waste M=Annulus Monitoring I=Initial Test G=Gas P=Standard Pressure Test 4=Four Year Cycle I=Industnal Wastewater R=Internal Radioactive Tracer Survey V=Required by Vanance 1 N=Not Injecting A=Temperature Anomaly Survey 0=Other(describe in notes) W=Water D=Differential Temperature Test Form 10-426(Revised 11/2012) MIT_PBU_P-13 7-1-15 rev xlsx mlimmoommimmiNimmommimmommoimmimmmom � oF T %%msH s THE STATE Alaska Oil and Gas 6.4.> oALAS KA Conservation Commission '.111-14 -:_, _ 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Maim 907.279.1433 OF ALAS� Fax 907.276 7542 SCANNED MAY 18 2015 vvvvvv aogcc alaska goy David Bjork Engineering Team Leader IgoBP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU P-13 Sundry Number: 315-176 Dear Mr. Bjork: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. oerster Chair DATED this `day of May, 2015 Encl. STATE OF ALASKA RECEIVED ALAS,."OIL AND GAS CONSERVATION COMM..,SION APPLICATION FOR SUNDRY APPROVAL MAS 2S1L/l$ 20 MC 25.280 AOGCC 1. Type of Request: 11-fl' ❑Abandon 0 Plug for Redrill 0 Perforate New Pool Repair Well 0 Change Approved Program ❑Suspend 0 Plug Perforations 0 Perforate •® Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. 0 Exploratory 0 Stratigraphic 190-111 • 3 Address Development ®Service - 6. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 50.029-22080-00-00 ' 7. If perforating: 8. Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? PBU P-13 • Will planned perforations require a Spacing Exception? ElYes—E1 No 9. Property Designator 10.Field/Pool(s): ADL 028288 Prudhoe Bay/Prudhoe Bay - 11 PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft) Effective Depth TVD(ft): Plugs(measured): Junk(measured) 9500' ' 9213' • 9417' 9147' 9265'(Sand) None Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20"x 30" 39'- 119' 39'- 119' Surface 2670' 10-3/4" 38'-2708' 38'-2708' 5210 2480 Intermediate 8997' 7-5/8" 36'-9033' 36'-8832' 6890 4790 Production Liner 710' 5-1/2" 8790'-9500' 8628'-9213' 7740 6280 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft) 9190'-9320' 8963'-9070' 4-1/2", 12.6# L-80 8794' Packers and SSSV Type: 7-5/8"x 4-1/2"Baker SAB Packer Packers and SSSV 8737'/8584' MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work' ®Description Summary of Proposal 0 BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development 0 Service 14. Estimated Date for 15. Well Status after proposed work' Commencing Operation June 15,2015 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval: Date 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative: - 0 WAG 0 SPLUG 0 Suspended 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Abby Warren,564-5720 Printed Name: David Bjork Title: Engineering Team Leader Email: Abigail Warren@bp com Signature: ........,/,..-- -;:.0:400.-- Phone: 564-5683 Date: 03/97-45 / s Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number 3 15 -1---/ 4 �// o Plug Integrity L 1 BOP Test Mechanical Integrity Test 0 Location Clearance • Ml�S/' iS 2520 1-'1;5 i'Other: app fit5f 1--o4oaars/ .,_ ,tom ZS-oc> �s /f 1--)in ui a r-- pi-C✓Z v3�t r f,5 / Q " / `i 1 vr� LG fi�'1 AI „--,..11.--1‘r-e-of R t •� 0�Gstt r�, tye e-55" G/ a /low p.-cic;r, f, b p 1,C f�1 �7 d{ r'^• ro ✓SCI r v a&wit, t P /Ja C�tC/'A✓�1 ✓/ cthCG /✓ PC . i}PIC .26,4�u��'"ux,mc.ft/y (oho MIJ pro Spacing Exception Required? 0 Yes gNo Subsequent Form Required: /p- 4 C 4 �(I D APPROVED BY / Approved By �4 d/ / q.,_,,,,..._ COMMISSIONER THE COMMISSION Dates- (� --4.S— Form �5 Form 10-403 Rewse 10/2012 for 12 months from the date of approvalSubmit In Duplicate ►arc. s/5// tfR1tfl"4At niiiam RBDMS MAY 1 1 2015 /"-- 3-- ) by 0 Sundry Request for Tubing Swap Well: P-13 Date: 3/26/2015 Engineer: Abby Warren MASP: 2520 psi ✓ Well Type: WAG Injector Estimated Start date: June 15th, 2015 History: P-13 was originally a Z4 producer that was frac'd in 1991 and converted to an injector in 1994. It has been injecting PW only since 2002 to support P-11, P-17, P-17L1, and P-26. A tubing leak developed in 1994 and an HES PERM Patch was placed from 866'-8672' MD. IN 2013 the well failed an MIT-IA and an acoustic LDL found 2 other tubing leaks. Patches were placed over the leaks. This restored integrity until the beginning of March 2014 and the well was shut in due to steady IA repressurization with clear, tubing interaction Scope of Work: The primary objective of the RWO is to restore integrity to the tubing. .i Pre Rig Prep Work: W 1 PPPOT-IC to 3500 psi, PPPOT-T to 5000 psi, Check all LDS for movement. S 2 Set a 2-7/8" PX plug in the XN nipple with reducer @ 8776' MD. Perform CMIT-T xlA to 4000 psi. Pull the KB patches at 6779' MD and 6942' MD F 3 SL/A-Pump down the tubing to establish a leak rate. Perform a CMIT-TXIA to 4000 psi. E 4 Perform a cut 3' down in the 10' pup joint below GLM #1 @ —8702' (according to the November 1990 tally which is attached to this document) F Pump down the tubing and record leak rate. Perform a post cut CMIT-TxIA to 1000 psi. Circulate the wellbore at a max rate with seawater (total volume of seawater should be —540 bbls which is 1.5 of wellbore volume). FP well with diesel to 2500' ✓ 5 Prep annular valves, Set a type a TWC. O 6 Remove the well house&flow line. Level the pad as needed for the rig. Proposed RWO Procedure: • MIRU Doyon 16. • ND tree. NU and test BOPE with four preventers configured top down (annular, 3-1/2"x 6" variable rams, blind shears, mud cross and 3-1/2" x 6"VBR's). Test the blind and VBR's to 4,000 psi and the annular to 3,500-psi. Pull TWC. • Pull the 4-1/2"tubing from the cut at—8700' MD • Run new 4.5"tubing 12.6# L-80 TCII with 7-5/8" x 4-1/2" stacker packer configuration • • Set a TWC and RDMO. Post rig Work ✓ 1 Pull the TWC S 2 Circ in comp fluid /freeze protect. Drop ball and rod. Set packer as per HES rep. MIT-T to 4000 psi for 30 minutes and MIT-IA to 4000 psi for 30 minutes. Pull ball and rod. Pull RHC- M. Pull the PX plug from the XN nipple in the original completion at 8776' MD. F 3 SL/A - Circulate in completion fluid and freeze protect. Perform pressure test of the tubing to 4000 psi for 30 minutes and MIT-IA to 4000 psi for 30 minutes • Loepp, Victoria T (DOA) From: Warren,Abigail M <Abigail.Warren@bp.com> Sent: Thursday,April 30, 2015 9:10 AM To: Loepp,Victoria T(DOA) Cc: Lastufka,Joseph N; Bjork, David Subject: RE: PBU P-13 (PTD 190-111, Sundry 315-176) Packer Depth variance required Follow Up Flag: Follow up Flag Status: Flagged Victoria I have reviewed the original 7-5/8" cement job (job performed in September of 1990). A total of 228 bbls of Class G cement was pumped, no losses were reported,the plug did not bump and the floats held. When the rig went back in to drill out the shoe, the TOC inside the casing was found at 8788' MD, making the shoe track volume a total of 11.3 bbls. Below are my cement calculations and TOC based on volumes and 30%washout. 228 bbls pumped minus the 11.3 bbls found inside of casing yields a worst case scenario of 216.7 bbls of cement on the outside of the casing. The annular length of 216.7 bbls with a 9-7/8" drilled hole with worst case scenario of 30%washout would be 4358', bringing TOC to 4675' MD Please let me know if you have any questions Thanks Abby From: Loepp, Victoria T(DOA) [mailto:victoria.loepo@alaska.gov] Sent:Tuesday, April 21, 2015 10:55 AM To: Warren, Abigail M Subject: PBU P-13 (PTD 190-111, Sundry 315-176) Packer Depth variance required Abby, The packer setting depth Is outside what is allowed by regulation.The regulation 20 AAC 25.412(b)says"The packer must be placed within 200 feet measured depth above the top of the perforations, unless the commission approves a different placement depth as the commission considers appropriate given the thickness and depth of the confining zone." A variance to this regulation must be requested and should include a review of the 7-5/8"cementing information and TOC determination. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W 7th Ave,Ste 100 Anchorage,AK 99501 1 TREE= 4"CNV Yu LF€AD= FMCD 4 SA._.f NOTES:I12S READINGS AVERAGE 125 ppm ACTUATOR= OTIS WHEN ON ML WELL REQUIRES A SSSV WHEN ON OKB.ELEV= 92' Mf. HES PATCH 4400 PSI BURST;4990 PSI COLLAPSE BF.ELEV= 54.78' KOP= 6883' Max Angle= 38'@ 9378' L 2081 H4-1/2"OTIS SSSV NP,D=3.81r Datum MD= 9105' Datum TVD= 8800'SS 10-3/4"CSG,45.5#,L80,D=9.950' 2708' C �/ ' --------- 4444-- ---- --------_.4444- �� 1� 4-1/2'BKR PATCH.ID=3.70"(09/28/13) -H 6779'-6806' • 1 r� GAS LIFT MANDRELS ST MD TVD DEV_ TYPE VLV LATCH FORT DATE 5 3102 3102 0 CAMCO DM' BK 0 03/13/94 [4-1/2"BKR PATCH,D=3.70"(09/27/13) H 6942'-6968' ►:� 4 5377 5377 0 CAMCO DM' BK 0 03/13/94 3 7177 7167 16 CAMOO 0M' BK 0 03/13/94 2 8587 9548 32 CANDO MY BK 0 11/21/90 CII 1 8693 8547 34 CA MCO OMY BK 0 03/13/94 14-1/2"HES PERM PATCH IO=3.25"(09/19/94) I--1 8661.-8672. III Minimum ID = 2.313" @ 8776' 8726' _--{44-1/2"PKR SWS NP,ID=3.813' -1 2-7/8" REDUCING NIPPLE 8736• --K-22 ANCHOR SEAL ASSY 7, 11 I 873T __I--i7-5/9"x 4-1/2'BKR SAB PKR,D=4.0' INN 8741' j--,5-1/2"MILLOUT EXTENSION,D=4.75' 874T I- 5-1/2"x 4-v2"XO,D=4.0" 8788' [4-1/2"PKR SWS NP,ID=3.813' _ 11111 8776' 4-1/2'OTIS XN NIP,D=3.725' 8776' J2-7/8'R NP H- SET NXNMP,D=2.313' `4-1/2'TB1-I G,12.6#,L-80,.0152 bpf,D=3.958" 8787' TOP OF 5-1/2"BKR LNR H 8790' 8794' H5-1/2-XO BKR SEAL ASSY W/O SEALS ( 8788' I-- ELMD TT LOGGED 07/11/91 1 / [7 5/8"CSG,29.7#,NSCC,D=6.875' 9033' k ,4 45 3 9084' —I MARKER JOlYT PERFORATION SUMMARY REF LOG:ATLAS BHCA ON 09/11/90 ' q i'f 0 I ANGLE AT TOP PERE:33"@ 9190' Note:Refer to Fkoduction DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE SQZ 9265' -CARBOLITE SANDBACK PLUG(11/03/95) 3-3/8" 6 9190-9247 0 04/07/91 3-3/8" 4 9247-9257 0 12/15/91 3-3/8" 4 9264-9286 C 11/03/95 - 3-3/8" 4 9290-9294 C 11/03/95 3-3/8" 4 9305-9320 C 11/03/95 PBTD H 9419' ,•••••••••••••4 5-1/2"LNR,17#,L-80,.0232 bpf,D=4.892" 1-1 9500' DATE REV BY GOPf NTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/21/90 AUDI#2 ORIGINAL COMPLETION ' 10/09/13 JCIWJMD ADDED 2 BKR PAM E (09/27-28/1 WELL: P-13 12/27/01 RN/TP CORRECTIONS 10/09/13 GJB/JMD PULLED 2-7/8"XX PLUG(10/03/13) F432MT No: '1901110 03/06/07 AK/TU-I PERF CORRECTIONS API No: 50-029-22080-00 02/10/11 MB/JM) ADDED SSSV SAF-±IY NOTE SEC 31,T11N,R13E,2496'FSL 8 2171'PAL 01/18/12 TM/MD ADDED112S SAFETY NOTE 02/14/13 WEC/JMD SET XX PLUG(02/11/13) BP Exploration(Alaska) Vv ELLHEAD= FMC 4" ■ -13 WSA. Y NOTES:H2S READINGS AVERAGE 125 ppm ACTUATOR= OTIS WI-UI ON MI.WELL REQUIRES A SSSV WHEN ON OKB.E-EV= 92' MI. BF.REV= 54.78' KOP= 6883' ----- -- ------------ Max Angle= 38°@ 9378' Datum M3= — 9105 I L2200' --{4-1/2"HES'X'NP,D=3.813" Datum1VD= 8800'SS 10-3/4"CSG,45.5#,L80,D=9.953" H 2708' ' ' - - 8,541' -141/2"HES'X MP,ID=3.813" Z 8,572' H7-5/8"x 4-1/2"FES'TNT',D=3.88" 4-1/2"TBG,12.6#,L-80,.TC-II,ID=3.958" —1 8698' 8,606' -4-1/T HES'X'MP,D=3.813" 8,698' —4-1/2"UM Overshot I 1 8726' H4-1/2"FKRSWS NIP,13=3.813" f1 8736' HK-22 ANCHOR SEAL ASSY 8737' —17-5/8"x 41/2"BKR SAB FKR,ID=4.0" 8741' —15-1/2"MLLOUT EXTENSION,ID=4.75" 8747' —I5-1/2"x 41/2"XO,ID-4.0" ' 8755' H4-1/2"PKR SWS NIP, ID=3.813" 4-1/2"TBG, 12.6#,L-80,.0152 bpf,D=3.958" — $787' \ 8776' H4-1/2"OTIS XN NP, ID=3.725" TOP OF 5-1/2"BKR LNR H 8790' 1-- r 1�� I I 8787' -5-1/2"XO BKR SEAL ASSY W/O SEALS $7$8$'' ELMD TT LOGGED 07/11/91 7-5/8"CSG,29.7#,NT-95HS,D=6.875" H 9033' A L .4 4-i I PERFORATION SUMMARY REF LOG:ATLAS BI-CA ON 09/11/90 ANGLE AT TOP PERF:33°@ 9190' )1 9096' -MARKER JOINT Note:Refer to Production DB for historical perf data —�/ q1 tl0 SIZE SPF INTERVAL Opn/Sqz DATE SQZ 3-3/8" 6 9190-9247 0 04/07/91 3-3/8" 4 9247-9257 0 12/15/91 9265' HCARBOLtTE SANDBACK PLUG(11/03/95) 3-3/8" 4 9264-9286 11/03/95 3-3/8" 4 9290-9294 11/03/95 3-3/8" 4 9305-9320 11/03/95 PBTD —I 9419' — 1111111 11111111111111 5-1/2"LNR, 17#,L-80, .0232 bpf,D=4.892 1-1 9500' AttWA4 DATE REV BY COMvENTS DATE REV BY CONVENTS PRUDHOE BAY UNIT 11/21/90 CWJ ORIGINAL COMPLETION 10/09/13 JCMJM3 ADDED 2 BKR PATCHES(09/27-28/1: WELL: P-13 12/27/01 RN/TP CORRECTIONS 10/09/13 GJB/JND PILLED 2-7/8"XX RUG(10/03/13) PERMIT No: '1901110 03/06/07 AK/TLH PERF CORRECTIONS API No: 50-029-22080-00 02/10/11 M3/JM3 ADDED SSSV SAFETY NOTE SEC 31,T11N,R13E 2496'FSL&2171'FWL 01/18/12 TM/JM3 ADDED HRS SAFETY NOTE 02/14/13 WECIJM3 SET XX RUG(02/11/13) BP Exploration(Alaska) § /§ z ). ' 0 1 \ •\ t®. " ko 6 ii © BE I / \\\ .1 / / \'\ '_ iJ:i1f uo ` | § ( ° \,2 � .°: h cc :,-.. | \ § CD 1 . LIJ _,0 % 2 - >eseeaoS ' | | | 1p | / ' | | 6 __i- \4�j 4:1 ■+ ¥ ;11 %§ �| § ■A A 11 '�'- ��. . -&d :, ®U!■. \j _�_| % \ \ ■ 0401' � | \ EE �° -�� »| §.p irli� \�\ �� | \b \ \� ~�� �� oo �� � ~ al \ ' & ii �| §§ m o � \ \ g'cc'f2 ` § o ■ § / k lo 2 § 2\ 2 ) 22 1-c! 61E »$ i \ _ (§ (. { jEC ) - § .\` . ?? ,C2 p m ,,, ) ( 2 q) ..§ e\ N % § ` \j LO� k \ \ \ § ; '-• K § • \�. « ■ - ) 1. « | W .„ 4 § |2 7 } / ¥§ § e6 iiUiiiiIi ISIIIIIIIiI II A 0 . cc o III f A\@ .1IiI_II L.,z o / . ! •A�j • - > g j 4� // kS Cl.) k &2 _ D I— {" Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /~./// File Number of Well History File PAGES TO DELETE RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts - Pages: [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other Complete COMMENTS: Scanned by: Bevedy (~ Vincent Nathan Lowell TO RE-SCAN Notes: Re-Scanned by: Bevedy Bren Vincent Nathan Lowell Date: /s/ NOTScanned.wpd • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator @bp.com] Sent: Monday, October 28, 2013 11:44 PM To: AK, D&C Well Integrity Coordinator; Regg, James B (DOA); Wallace, Chris D(DOA); AK, OPS GC1 OSM;AK, OPS GC1 Field O&M TL;AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Team Lead;AK, D&C Wireline Operations Team Lead;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator;AK, D&C Projects Well Integrity Engineer; Climer, Laurie A Subject: UNER EVALUATION: Injector P-13(PTD#1901110) Passing MIT-T&MIT-IA Attachments: P-13.pdf; Injector P-13 TIO Plot 10-28-13.docx All, Injector P-13 (PTD#1901110) passed an MIT-T and MIT-IA after installing two patches to repair TxIA communication. The passing tests confirms two competent barriers in the wellbore. At this time the well is reclassified as Under Evaluation to allow the well to be brought online for Regulatory Compliance testing. Plan Forward: 1. Operations: Place well on injection classified as Under Evaluation 2. Fullbore: Once the well is thermally stable, perform a witnessed AOGCC MIT-IA Please call with any questions. Thank You, Shane Wills filling in for Laurie Omer BP Alaska -Well Integrity Coordinator GW C lobal Wells Organizatior^•'•; WIC Office: 907.659.5102 WIC Email: AKDCWe1IIntegrityCoordinator ABP.com From: AK, D&C Well Integrity Coordinator Sent: Friday, February 01, 2013 7:42 PM To: 'jim.regg @alaska.gov'; 'chris.wallace @alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; Climer, Laurie A; Vazir, Mehreen Subject: Update NOT OPERABLE: Injector P-13 (PTD #1901110) Failed MIT-IA All, injector P-13(PTD#1901110)failed its MIT-IA prior to being returned to injection. The failing test confirms a lack of two competent barriers. At this time it will remain classified as Not Operable and on the Quarterly Injection Report as a Not Operable Injector. Regards, Laurie Climer 1 TREE= 4"aw • _- V1ELLHEAD= FMC SAFETY NOTES:H2S READINGS AVERAGE 125 ppm _ ACTUATOR= OTIS WHBil ON Ml.WELL REQUIRES A SSSV WHEN ON OKB.E.EV= 92' MI. HES PATCH 4400 PSI BURST;4990 PSI COLLAPSE BF.ELEV= 54.78' KOP= 6883' , Max Angle= 38° €i 9378' 2081 I--j.4-1/2"OTIS SSSV NIP,D=3.813"j p Datum ND= 9105 DatumTVD= 8800'SS { 10-3/4"CSG,45.5#,L80,ID=9.953" -j 2708' 1-41 11 0 11 4-1/2'BKR PATCH,ID=3.70"(09/28/13) 1--{ 6779'-6806' • kIl GAS LFT MANDRELS 0 0 ST MD TVD_DEV TYPE VLV LATCH PORT DATE II II 5 3102 3102 0 CAMCO DMY BK 0 03/13/94 L4-1/2"BKR PATCH,D=3.70"(09/27/13) H 6942%6968' 0 0 4 5377 5377 0 CAMCO DMY BK 0 03/13/94 3 7177 7167 16 CAMCO DMY BK 0 03/13/94 2 8587 9548 32 CAMCO DMY BK 0 11/21/90 ►1 ►1 1 8693 8547 34 CAMCO DMY BK 0 03/13/94 ff4-112"HES PERM PATCH,ID=3.25"(09/19/94) - 8661'-8672' U L.-_._ ( 0 0. Minimum ID = 2.313" © 8776' {8726' -14-1/2"PKR SWS NP,ID=3.813" 1 2-7/8" REDUCING NIPPLE 8736' - K-22 ANCHOR SEAL ASSY Z4 ►� I 8737' I--{75/8°x 4-1/2"BKR SAB PKR,D=4.0' 1 8741' IH5-1/2"MLLOUT EXTENSION,D=4.75' I 874T 5-112-x 4-1/2"XO,D=4_0"J 8755' -14-1/2°PKR SWS NP,ID=3.813' 8776° -141/2"OTIS XN NIP,D=3.725' 8776' J 2-718"REDUCING NP 1SETNXNNP,ID=2.313' 14-1/2"TBG,12.61/,L-80,.0152 bpf,D,-----3-.95-8 8787' 'TOP OF 5-112"BKR LNR H 8790' { 8787• I-{5-1/2"XO BKR SEAL ASSY W/O SEALS 1 8788' H ELMD TT LOGGED 07/11/91 I 7-5/8°CSG,29.7#,NT 95HS,D=6.875" I--I 9033' } • ■ 90+95° HMARKER JOINT PERFORATION SUMMARY REF LOG:ATLAS BHCA ON 09/11/90 ANGLE AT TOP PERE:33"@ 9190' ; Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz DATE SQZ -° 9265' ( CARBOLRE SANDBACK PLUG(11/03/95) 3-318" 6 9190-9247 0 04/07/91 3-3/8" 4 9247-9257 0 12/15/91 ' 3-3/8" 4 9264-9286 C 11/03/95 3-3/8" 4 9290-9294 C 11/03/95 3-3/8" 4 9305-9320 C 11/03/95 PBTD ( 9419' ►11ID��' ►1111111111 AA I1.1....w 5-1/2"LNR,17#,L-80,.0232 big,ID=4.892' H 9500' :A. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/21/90 CWJ ORIGINAL COMPLETION 10/09/13 JCIWJMD ADDED 2 BKR PATCHES(09/27-28/1 VVELL P-13 12/27/01 RN(TP CORRECTIONS 10/09/13 GJB/JMD PULLED 2-7/8"XX PLUG(10/03/13) PERMIT No: '1901110 03/06/07 AK/TLH PERF CORRECTIONS AR No: 50-029-22080-00 02/10/11 M3/JMD ADDED SSSV SAFETY NOTE SEC 31,T11N,R13E,2496'FSL&2171'AM.. 01/18/12 TMWJMD ADDED H2S SAFETY NOTE 02/14/13 VVECIJMD SET XX PLUG(02/11/13) BP Exploration(Alaska) ■ • • M O 4 I CV co < CV so8�b ifi*IF I I I 1 5 a a 1 a 1 M N _ M 0 o d H rl 1 T o 3 I 3 o �g ,n i co r, I I i0 1 g o ^ a o C M 4t rl 0 d I r 0 I— U w Z • BPXA Well Integrity Engineer 907-659-5102 From: AK, D&C Well Integrity Coordinator Sent: Friday, December 21, 2012 5:38 PM To: 'jim.regg @alaska.gov'; 'chris.wallace @alaska.gov'; AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; Walker, Greg (D&C); Climer, Laurie A Subject: NOT OPERABLE: Injector P-13 (PTD #1901110) Due for Compliance MIT-IA on 12/29/2012 All, Injector P-13(PTD#1901110) is currently shut in for drilling that is ongoing on well P-17. The well is due for its 4 year compliance testing on 12/29/2012. As the well will continue to be shut in until the rig work is completed,the well is reclassified as Not Operable until such time that it is ready to be placed back on injection. Plan forward: 1. Fullbore: MIT-IA to 2500 psi prior to beginning injection 2. Operations: Place well on injection classified as Under Evaluation 3. Fullbore:Once the well is thermally stable, perform a witnessed AOGCC MIT-IA Please call if you have any questions. Thank you, Gerald Murphy BP Alaska -Well Integrity Coordinator GWGlobal Wells Organization WIC Office: 907.659.5102 WIC Email: AKDCWe1IIntegrityCoordinator @BP.com 2 • STATE OF RECEIIIED • A KA OIL AND GAS CONSERVATION COMAION OCT 2 3 2013 REPORT OF SUNDRY WELL OPERATIONS ,. 1.Operations Abandon U Repair Well U Plug Perforations U Perforate Li Other U 3 Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown Stimulate-Other ❑ Re-enter Suspended WelCJ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development❑ Exploratory ❑ 190-111-0 3.Address: P.O.Box 196612 Stratigraphin Service 0 6.API Number: Anchorage,AK 99519-6612 50-029-22080-00-00 ' 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028288 • PBU P-13 • 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL • 11.Present Well Condition Summary: Total Depth measured 9500 feet Plugs measured None feet true vertical 9212.84 feet Junk measured None feet Effective Depth measured 9265 feet Packer measured 8737 feet true vertical 9025.39 feet true vertical 8584.1 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 37-117 37-117 0 0 Surface 2672 10-3/4"45.5#NT-80 36-2708 36-2707.97 4560 1730 Intermediate None None None None None None Production 8998 7-5/8"29.7#L-80 35-9033 35-8831.65 6890 4790 Liner 680 5-1/2"17#L-80 8790-9470 8628.21-9189.12 7740 6280 Perforation depth Measured depth 9190-9200 feet 9200-9225 feet 9225-9247 feet 9247-9257 feet 9264-9265 feet 9265-9286 feet 9290-9294 feet 9305-9320 feet True Vertical depth 8963.27-8971.63 feet 8971.63-8992.43 feet 8992.43-9010.61 feet 9010.61-9018.83 feet 9024.57-9025.39 feet 9025.39-9042.53 feet 9045.79-9049.04 feet 9057.96-9070.08 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 35-8794 35-8631.54 Packers and SSSV(type,measured and true vertical depth) 4-1/2"Baker SAB Perm Packer 8737 8584.1 Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED i\iLV tt Zu � � W Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 613 121 258 975 311 Subsequent to operation: 0 0 0 0 0 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development❑ Service 0 • Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil ❑ Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG 0• GINJ ❑ SUSP ❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 313-463 Contact Garry Catron Email Garry.Catipti BP.Com Printed Name Garry Catron Title PDC PE Signature 11 Phone 564-4424 Date 10/23/2013 1//-r• "4"/0,/� RBDMS OCT 2 5:Litt 1r/2k f 13 Form 10-404 Revised 10/2012 Submit Original Only Casing / Tubing Attachment ADL0028288 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20"x 30" 37 - 117 37 - 117 LINER 680 5-1/2" 17# L-80 8790 - 9470 8628.21 - 9189.12 7740 6280 PATCH 24 4-1/2" Baker Flo-Guard Patch 6779 - 6803 6778.12 - 6801.93 3500 3500 PATCH 24 4-1/2" Baker Flo-Guard Patch 6942 - 6966 6939 - 6962.53 3500 3500 PATCH 11 4-1/2" Halliburton Perm Patch 8661 - 8672 8520.78 - 8529.97 4400 4990 PRODUCTION 8998 7-5/8"29.7# L-80 35 - 9033 35 - 8831.65 6890 4790 SURFACE 2672 10-3/4"45.5# NT-80 36 - 2708 36 - 2707.97 4560 1730 110 TUBING 8759 4-1/2" 12.6#L-80 35 - 8794 35 - 8631.54 8430 7500 Sr • • 0 a co o Q DN Qu°, ° ca D co E W = U Z _ J co 11 D N ■∎ D m ° O >- - W 1 P2. a I- m _ ©� O ° co °o _CF- 3 Jo ~ rnc`no SEE ° O O to N- --I N �-// N O In l^ ,..?.. c6 0 > M (D Q - cc wD W' w 3 - F- E ° N ZZ ° * ZZ W El? in 2F- 0,Qco U) 2 O = U U F- 7 N U) D in I- H p Frn p D U)4, F- ( U) w N 2 rn Q Q cn L !Z L U N 0 F- d U N Z D Q co 2 = a W J Z U Q J O W N d cn co D a = U = Q Q L (ID) m = O QO J w Li- -T---' d H O F" U) * 0- c N H °-c. i ca U a � a > u' Op w acoo , w a � m a cn E a_0 d Lo Q Q N 6) � O Z Cl) r N 0 Z U � M � a N 2 U) Q ° 1.- O- a CL II 0 F- Z � cp � OLL ac°ia v C � � � 2 F- 0 Q CO' L r N F- F- w Cn w o U D U) w D 0 T- o ° C ~ N u) min a wa Cl) < 0 w F= o �' � w I Z a * Ia- la0 ° ,Z� 2 ° O � C LO F- * Z a-) Q = LU IL co p -QF- Q o a, C * m OQ (0 c O 45 = wW J LLNOF- c`', 7 Ja> D Q F- F- 2 01 t 0 vF- (9 D w � cn JW F- oN N - N- >- F- D ~ c o c 'CD 3 `�p O Q 8 < F- * N Ica -_1Qw F- co o 0 3 0. Oa m O_d < * Y @)aw z N O wIaOL 2 .Cc M -°aop 13 QD c * 2Oa a co - ~ z CD QF- ~ w ~ N � 5 j N F_ -12F- W > ° _ WZW QCZ OC°o °� wzFF- Zo U) aa) * * a o c>3O >, < -, 1- 0 � oN DmO WaN � - Q w * II * * E � C� � U II ._ = DOz Q "' ,- p - � Oa - L` ° � � � F- zo * E -0 omm EmQ p v �r1_ � D wow Do � 1- F- Q Lo w W E O 4- EF- ca ~ O < N- 2 (i) pin * UOs «Sc°r, Z DN * OZ F1'' vii o a7i cn 'Era ) D zoiQ arm F- Z * (- F- -, = ° JN_ _o E c - E -a co 0 ' 2 ' II W Z D Z U) 11 Z F- p W Z a p "" II a M -0 "O C -0 d' to Q � N (nw O5w S F- p0 z � CL wLUw � a '4r, r, C ° v J � DJ JF- -JLUD U-I - U 0E- D WU � W COM -0 2 � -0 O QN Q w F- w w J * w a 2 J J O m Q * W CL 0 J J m N Q Q N = '-- 0 * u_ 0 * * ~ WDOQQwz ? O � WDOrwZ * O = m * Na a,>II * OZ * * zfn2UJa5LU * * ? CD 0 j L� * P: a. n. * 0- QQ S22 co c) c) co co r r r r r c. aN N a N N N N. N- co O N N CO 0 a) a) a) 0) Daily Report of Well Operations ADL0028288 T/I/O =1012/546/25 Temp= S/I MIT-IA to 4000 psi. (secure well) ** IN PROGRESS ** Pumped 6.5 bbls amb diesel down IA to achieve test pressure. See log for test details. ***WSR continued on 10/1/2013 10/2/13 *** ***WSR continued from 10/1/13 *** MIT-IA ** PASSED **to 4000 psi. (secure well) Pumped an additional 0.2 bbls amb. diesel down IA to bump up test pressure for MIT-IA. First 15 min IA lost 23 psi. Second 15 min. IA lost 18 psi. Total loss in 30 min.=41 psi. Pass per Full Bore WSL. Bled TBG and IAP —6 bbls. RDMO FWHP's = 1050/485/26 SV, WV, SSV= closed MV= open IA and OA= 10/2/2013 OTG. DSO notified of LRS departure. ***WELL S/I ON ARRIVAL*** (pull plug) PULLED 2 7/8"XX-PLUG FROM NIPPLE REDUCER @ 8,757' SLM/8,776' MD • 10/3/2013 ***WELL LEFT S/I UPON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** • 1 TREE' R�= 4"CM/ • WELLHEAD= FMC D I ') SAFETY NOTES:112S READINGS AVERAGE 125 ppm ACTUATOR= OTIS WHEN ON MI WELL REQUIRES A SSSV WHEN ON OKB.ELEV= 92' MI. IBS PATCH 4400 PSI BURST;4990 PSI COLLAPSE BF.ELEV= 54.78' KOP= 6883' Max Angle= 38°@ 9378' 2081' 4-112"OTIS SSSV NP,D=3.813" Datum MD= 9105 Datum 1V D= 8800'SS 10-3/4"CSG,45.5#,L80,D=9.953" H 2708' ►�� ►�� 4-1/2'BKR PATCH,ID=3.70'(09/28/13) —1 6779'-6806' • Ci GAS LFT MANS ►.� 0 ST kV I VD DB/ TYPE VLV LATCH FORT DATE • I 5 3102 3102 0 CAMCO DM/ BK 0 03/13/94 4-1/2"BKR PATCH,D=3.70"(09/27/13) 6942'-6968' Cam∎ ►i __.__ 4 5377 5377 0 CAMCO DMY BK 0 03/13/94 3 7177 7167 16 CAMCO MY BK 0 03/13/94 2 8587 9548 32 CAMCO OMY BK 0 11/21/90 ►T, ►,7j 1 8693 8547 34 CAMCO DAY BK 0 03/13/94 4-1/2'HES PERM PATCH,ID=3.25'(09/19/94) — 8661'-8672' ►�� ►.� Minimum ID = 2.313" @ 8776' 8726' "14-1/2'PKR SWS NP,ID=3.813' 2-7/8" REDUCING NIPPLE -{ 8736' —K-22 ANCHOR SEALASSY 1 F, 1 8737' F 7-5/8"x 4-1/2'BKR SAB PKR,D=4.0' ill 8741' —15-112'MLLOUT EXTENSION,D=4.75' 8747' iH5-1/r x 4-1/2'X0,D=4.0' I 8755' .H4-112'PKR SWS NP,ID=3.813' 8776' —14-112'OTC)04 NIP,D=3.725" 8776' _,2-7/8"REDUCING NP SET NXN MP,ND=2.313" 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" 1— 878T TOP OF 5-1/2'BKR LNR H 8790' i_- 1------------i 8787' --5-1/2'XD BKR SEAL ASSY W/O SEALS 8788' 1—I ELMD TT LOGGED 07/11/91 7-5/8"CSG,29.7#,NT-95HS,D=6.875" —{ 9033' , , 9096' --{MARKER JONT 1 PERFORATION SUMMARY REF LOG:ATLAS BI-CA ON 09/11/90 ANGLE AT TOP FEW:33°@ 9190' Note:Refer to Production DB for historical pert data SIZE SW NTERVAL Opn/Sgz CATE ST-17 1 9265' --HCARBOLITE SANDBACK PLUG(11/03/95) 3-3/8" 6 9190-9247 0 04107/91 3-3/8' 4 9247-9257 0 12/15/91 3-3/8" 4 9264-9286 C 11/03/95 3-3/8" 4 9290-9294 C, 11/03/95 3-3/8" 4 9305-9320 C 11/03/95 PBTD 9419' ■ 1 5-1/2"LNR,17#,L-80,.0232 bpf,ID=4.892" 1-1- 9500' '.. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUCHOE BAY UNIT 11/21/90 CWJ ORIGINAL COMPLETION 10/09/13 JCM,RA3 ADDED 2 BKR PATCHES(09/27-28/1 WELL P-13 12/27/01 RDYTP CORRECTIONS 10/09/13 GJB/JM) PULLED 2-7/8"XX PLUG(10/03/13) PERMIT No: '1901110 03/06/07 AK/TLH PERF CORRECTIONS API No: 50-029-22080-00 02/10/11 MB/JMD ADDED SSSV SAFETY NOTE SEC 31,T11N,R13E,2496'FSL&2171'PM. 01/18/12 TMN/JMD ADDED HZS SAFETY NOTE 02/14/13 WECJJM)SET XX PLUG(02111/13) BP Exploration(Alaska) I • • 4,i+ I OF i%i� 9 THE STATE Alaska Oil and Gas " A i�'�' ofAL S� Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue inr" Q. Anchorage, Alaska 99501-3572 ALAS Main: 907.279.1 433 7 Fax: 907.276. 5 42 Scott Warner Petroleum EngineerNNE� � `�r.",, i3 a1 w BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 a ° l Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU P-13 Sundry Number: 313-463 Dear Mr. Warner: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 4)4/L Daniel T. Seamount, Jr. Commissioner DATED this/I day of September, 2013. Encl. • • ca-A5 RECEIVED STATE OF ALASKA ck/‘% AUG 2 7 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCC 20 AAC 25.280 1.Type of Request: Abandon❑ Plug for Redrill❑ Perforate New Pool❑ Repair Well El • Change Approved Program❑ Suspend❑ Plug Perforations❑ Perforate❑ Pull Tubing❑ j Time Extension❑ Operations Shutdown❑ Re-enter Susp.Well Stimulate❑ Alter Casing❑ Other IC 4+h Y 1117 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. / �l(i G C 3 BP Exploration(Alaska),Inc. Development ❑ Exploratory 111 190-111-0 ✓ - 3.Address: Stratigraphic ❑ Service 0 , 6.API Number. P.O.Box 196612,Anchorage,AK 99519-6612 50-029-22080-00-00 • 7.If perforating: 8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? 341 D PBU P-13 - Will planned perforations require a spacing exception? Yes ❑ No ❑ 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL0028288 • PRUDHOE BAY, PRUDHOE OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth ND(ft): Plugs(measured): Junk(measured): 9500• 9213 • 9265 9025 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 73 20"Conductor 37-110 37-110 Surface 2672 10-3/4"45.5#L-80 36-2708 36-2707.97 5210 2480 Intermediate None None None None None None Production 8998 7-5/8"29.7#L-80 35-9033 35-8831.65 6890 4790 Liner 710 5-1/2"17#L-80 8790-9500 8628.21-9212.84 7740 6280 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment See Attachment 4-1/2"12.6# L-80 8794 Packers and SSSV Type: 4-1/2"Baker SAB Perm Packer Packers and SSSV MD(ft)and ND(ft): 8737 85841 No SSSV Installed No SSSV Installed 12.Attachments: Description Summary of Proposal ❑ 13.Well Class after proposed work: Detailed Operations Program 151 BOP Sketch ❑ Exploratory ❑ Development ❑ Service El 14.Estimated Date for 15.Well Status after proposed work: Operations: 9/9/13 Commencing Oil g O p ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG 0 • Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Scott Warner Email Scott,WamerOBP.com Printed Name colt Warner Title PE Signature Phone Date ((f�"'J 564-5865 8/26/2013 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. �`3-44....(2.73 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test t Location Clearance ❑ Other /4- 1 1 „i -c-C,f/oh ttA-l--z- I-, / f41 I S.S RBDM` OCT 1 0 20 i Spacing Exception Required? Yes ❑ No © Subsequent Form Required: ill--1 1,4 0 APPROVED BY Approved big( COMMISSIONER THE COMMISSION Date: /1/` /l 1,...3 v 1/ ( 1l3 --r ; Form 10-403 Revised 1/2010 A pp rove 4pf r1li N `hs from the date of approval. it in Dp te � � • /� � • • by 0 To: C. Olsen/J. Bixby Date: August 16, 2013 GPB Well Ops Team Leaders From: Bethany Freel AFE: APBNRWOS Interventions Engineer Est. IOR: 50 bpd Scott Warner P Pad Production Engineer Subject P-13 4-1/2" Tubing Patch WBL Steps 1 S Drift with KB packer drift 2 E Set lower patch at 6781'-6801' MD &6944'- 6964' MD. 3 F Fullbore pressure test tubing to 3500 psi, pressure test IA to 4000 psi 4 S Pull 2-7/8" XX plug @ 8776' MD Well Status Current Status Not Operable TxIA Max Deviation 38° @ 9378' MD Minimum ID 2.313" @ 8776' 2-7/8" Reducing Nipple Last Test N/A Injector H2S N/A Expect <20 ppm Last Downhole Op 07/22/13 Eline LDL Last TD Tag 12/04/12 SD @ 9209' w/2.25"cent d 1.5" SB. Objective Restore tubing integrity by setting two -20' element-to-element 4-1/2" Baker Flo-guard patches over the tubing holes at 6781' — 6801' MD & 6944' — 6964' MD. These patches are being set to restore integrity and put the injector back online. A new lateral was recently added to producer P-17 in the pattern. By bringing this well back online, the P-13 pattern will be analyzed to understand how vital P-13 is to the surrounding producers. Depending on results, a tubing swap may be justified in the future. Well History 1 • • P-13 was originally completed in November of 1990. P-13 was originally a Zone 4 producer that was frac'd in 1991 and converted to an injector in 1994. It is currently injecting PW only and supports P-11 and P-17L1. It has not been on MI since 2002. From a 2006 IPROF, 100% injection is going into the top 30' of perforations and in 1995 the bottom 56' of perfs were sanded back and it doesn't appear injection is entering these perforations. The well failed a MIT-IA on 02/01/13. A TTP was then set @ 8776' MD and the well failed an MIT-T on 02/10/13 and passed a CMIT-TxIA on 02/11/13. A LDL was run on 07/22/13 and found leaks at 6955' and 6791'. P-13 already has a patch at 8661'-8672' that fixed a leak in the tubing in 1994. This well will go back on MI and the IA needs to be pressure tested to 4000 psi while keeping pressure on the tubing to ensure the packers don't get blown out. Contacts: Bethany Freel, Interventions Engineer Office: 564-4352 Cell: (907) 378-6493 Scott Warner, P Pad Engineer Office: 564-5865 Cell: (907)-830-8863 Procedure Slickline 1. Drift with KB packer drift (in wireline building) 2. RDMO slickline E-line 3. Set the bottom patch at 6944'- 6964' MD, with the middle of the 20' element-to-element 4- 1/2" Baker Flo-guard patch at 6954' MD (at this depth the patch will avoid the tubing collars which are at 6932' and 6972') 4. Set the top patch at 6781'-6801' MD, with the middle of the 20' element-to-element 4-1/2" Baker Flo-guard patch at 6791' MD (at this depth the patch will avoid the tubing collars which are at 6774' and 6814') • Tie-in with the wellbore schematic • An annotated copy of the E-line LDL log from 9/26/12 is attached below. This log is tied into the wellbore schematic so it can be used to assist with tie-ing in. • A drawing of the 20' element-to-element 4-1/2" Baker Flo-guard patch to be run is attached below. 5. RDMO E/L Fullbore/Slickline 6. Pressure Test. 1. MIT-T to 3500 psi. If it fails, establish LLR- RDMO 2. MIT-IA to 4000 psi. During MIT-IA, HOLD 3500 PSI ON TBG TO PROTECT PATCHES. If fails, LLR. 3. Pull 2-7/8"XX plug from Reducing Nip at 8776' MD. 7. RDMO 2 • • TRFF. I VAILHIbILD- - of P i 3 m INC , SA NOTES:112S READINGS AV K ERAGE 125 ai •;ACTIAILBE t ,,, VIVIAION OIL WELL REQUIRES A 5:55V WHEN ON I iNs a Ft.'= 91 83' ATE HOE PATCH 4400 PSI BORST;4910 PS/COLLAPSE 113F.ELEV= 54.78' I = 3E 37 1 i" 2001* 1—[4.-1,r OM S8sv NP,0=3 str 1 roux Angle T 0 95' tOadune WO= 9100' 0 . _ Odium TV D K 8809'SS GAS LIFT LEATICRB.S 10-314*MG,45.54.1.14 D=9,953 VOW ST MD TvOl ceat rem VLV LATCH mg!' DATE 5 3102 3510 0 CA141;t3 PM 13K a 0303794 Minimum ID=2.313 fa 117767 , 4 6377 5285 0 GAIXO CAN BK 0 03/1314 2-7JV REDUCR40 NIPPLE WI 3 7177 7075 16 CAP= OW BK 0 0313194 2 8687 war 32 GA1AT:0 ENT( BK 0 1ITZLISO 1 p693 13456 34 CALICO TAI BK 0 03(13/94 ,..,....,,,....--- Ar■ 4-117 HFS PFFIM PATCH,Et.3 25 rim 14 i ;9561' I j 8724; J-14-1i7 PKR SW5 NP. I Mir -11C82 ANCHOR SEAL ASSY -. , 0,, _______:873T ---17-51,4 4V2 vr UK R TAB PKR.10.4 V i .4 L. 1 gm, H6412 IALLOUTIEXTENSKIN.13 la cm raw j--0-tor x 4-vr 940.ID=4.0. i II ow 1 rz PR sws NP 6 3.83- I —L4-1 , - 1 IN -1-- ------__,,i wrrr c 14.412.emt n4 Imp. cfyr L.2-711r F03:41DNG NIP SET N XN 14P,0=2 313. 4-4.11 ,2' .....T84,12. ,1.-ax,W80,0.=3.884r sTirr . 1076. 1H2-7r)ot F1UG(02.11113) ITOPOF 5-112-BKR UR H 679, I ir ---'-'-"-------i ver 1-15-117 413 SKR sem.ASSY W/O SEALS j ... 87W I 1 ELMO TT LOGGED 07/11/91 1 1 7-5i3 MG,211.78,N1-95143,ID.8.&75- H sow E. A 1.■ •' t. ...N4.21._.JJTANT "TM SUMMARY . 1 Rff LOG ATLAS BHCA ON 0911/90 ANGLE AT TOP PERE.33 0 43193' Neter Refer* On Mr Mamma part*OA now --CARB04.11E BANCO ACK PLUG 1 LICLVOL; SEE SP. INTERVAL OpnlSett ' DATE SOZ— 3-31" 6 MO-9247 0 . 04101791 3-3ff 4 9247 9257 0 1216P91 . 3-31" 4 9264-9286 C 11433095 3-361" 4 BM-9284 c 110345 3-3ff 4 9305-9320 c ' 1103095 9" i FS112 941 ■I NAVA 444444 .4.4.04.4.4.4.4 5-F----- -------80 Ni Dlir LFR 170.L ,.0232 , K 4.1021 H Nor riaLTE Fear BY COMM'S nATE RS/BY 03111604P3 PF1EHOE BAY LINT 11421110 CM ONIGIBIAL COMPLETION 011E02 TIMM)ADOEDI-25 SAFETY NOTE VAIL P-13 12127/01 CP ,COREECVNS 02041MSEM LX ( 11J13) FERMI tax 1 WO-1 110 0306 AKTILH PERF 004C , AR tbe: 50029 2208000 — — — 0114100 RPNISV PAPCH CORFarThNS , SEC 34,T1 IN,R13E °Nivea' isv comnom 02/10111 , 4431AU ALCM SSSV SAFETY NOTE EiP Etpletallon(Alaska) 3 • • • TUBING SUMMARY Rig AUD 62 Date 11120190 Well * P-13 Tubing 4-112- 1 2.60 TDS KB: 37.80 AGL 225JTS ON RACK 215 ,ITS. RAN 10 .ITS. OUT 8876..06 FT. ON RACK 8476,75 FT, RAN 399.31 FT.OUT - r i - 1 IV - 951 ► • :j IMI ' BAKER SASSY. W/O ASS 6 • MlnMnilliglnIFMMI y • . : • ! BUTT Pt ' • . = 6. �-31Val [+I•'' r - • ;: • t SWS - • 8.754.92_. 8.756.05 TDS PUP 3.00 6_747.90 =.750.90 .+.. s -ACKER 11.1 . - 74 : • 10' TDS PUP 9.68 8327.07 8.736.75 SWS NIPPLE 1.14 8.725.93 8.727.07 5.95 .x.719,98 8.725.! 10' TDS PUP 10.25 8.709.73_ 8.719.98 , 01 6.57 8.892.71_ 8.699.28 10' PUP 10.25 8.682,46 9.692.71_ Y • i - • IP . 8 69 . r 111' PUP 10,.25 8.593.12 8.60.37 Gird • • .. MlltrjIIIIIIIIIIIIaaaIMMINMIHMIIIIMIMINIMII 8 76 alliMinn= 1 DS TBC -37 4 7 194 • 11' PU- IMIIIrrIMIIIII. 7 18 7: IIMNITIMII GLM I MAI= 1 10' PUP 10.28 5.383.4 ,3913.89 76.87 10" PUP 1029 5,3626.61 IIRRNI r 1 • • .9 IT znrinraIIIIIIIIIMIMIIIIIIINIIIIIIII. . r 3 102.3 IlittWEADWAIII 10' PUP 10.26 3.092.09 3.102.35 • a t A 1 98 ; . }1 • . , . minwmuirirasOrumm €195.5 7 105. ; 14.11 'a1 , . • •1• - 17 _... a 071_ 1 =_. M 4 102 TBS 'T; . _ - 0.8. * - iirEMMIN 1:1;„ 0 .1 P ''P _- 0'+1-4' • •' F.M.C. T130. NOR, 3.35 35.00 38.35 K.B.TBG. SPOOL 5.00 0.00 __ 35'°° 0.00 0,00 0.00 0.00 4 • S • .,. , dsoci oioexiivos,* LEAKpoiNTrm SURVEY , sr 1111ft . w V XTU-CCL -TEMP - LP 1191 ■ 22 -Jid-2013 PnoAmirivis D.It,14 u"iric SF sav i cir% - , 8 , Company BP EXPLORATION (ALASKA) t INC. .....Z CO Well p . 1 3 in ...% 1 Field PRUDHOE BAY Borough NORTH SLOPE State ALASKA .... >,. as dur ..g. CO ciL Surface Location Other Sertiices 0 CO None 2,495.521 FSL & 2,17112 FL 1— -o n v Mt CL CL Z < SEC: 31 TVIR: 1111 RGE: 13E Elevation ›,.. a r Permanent Datum MSL Elevation 0.00‘ 'K B, 91,83' E = 2 Log Measured ROM RKIB 91,83 FT, Above Perm. Datum D.F„ Nth API Sena!Nutebn 50-029-22080-00 GA..- NIA [-imp ? -Jui- :I 3 k un Number One - , P B T D Driller 9,419' XX Plug a 8,778' SB Pkig©9,255' _ P B T D Logger Not Tagged Bottom Logged Interval 8,770' T. I L.4 Interval Surface. Open Hole Size ®s NIA * Type Fluid Diesel Max Recorded Ten,.(deg. F) ime .11 -eady 06:30 FINAL PRINT Time Logger an Bottom 16:00 4*±riami Number SU) EL*2128 _ . Lovabon North - . . - Servkle Invoice No 13124 Reaanted B Wm. McCrossan T,Thompson _ ViMnessed By A.Ogg E Townsend Borehole Record Tub mg Record Run number Bit From 4, TO 34. Ls i Ft t From To 4 , _, ___ laq_aL50 . Surface Costa Room' , Size LB/ T rt 1 Top Boain Si/face sting 10314' 4E50 I &efface 2,708' Prot,String 7 mr -- 29.70 Surface , 9 033' Liner 51/2" 17_00 8 790' . 9,500' Liner 5 • • 4 1/2" Straddle Packer 20' Spacing OD ID Length 1.18' i Upper Straddle Packer .51' 4 GS Fishing Neck Up 3.70" 2.37" 5.51' 31/2'STL Pin Dawn • . T 30K She Release (11)1/4"-20 Shear Pin a 11320$,(3"Shear) a . • •• 193' 20' -15' 3%" 9.3#STL Pup Joint 3.500" 2.910" --15.00' ALE • Lower Straddle Packer 3 1/3"Box Up 30K Shear Release WLEG Down 3.70.. 2.37" 5.80. (5)14"-20 a 7075$s(14 Shear) 4.57' (4)5J16"-18 a 95294'a(2"Shear) V OYweetkoe are applailmle.11mr00%C Ind! tng/s'W'al':rQ comm. €OD 0,13-12 6 • • i , 1 ..,. i 1 1 I i * I I , , N , Top of upper patch at 6781' 1‘1 . i CCI_ —•••- . 1 , _ _____ Line Speed i 1 1, ' — , •; % ,. Temperature --110-: Temperature----44 . : 1 , _ -,____ ""-- - Dirte-enttal Temperature ----e , '---- • - -__ _ ___ _ ,.% . • i „.. ---, ------------1, ---._, i I ----------' - -,. ___ • i .._._------7 Leak Signature .--" ‘60' I L . , LeattPointr"-A • , t _ LeakPoiritTm-B i 1 Leak Poinb— - c Bottom of upper patch at 6801' t 11-4—:111 . '11 t. -IL i _ } i, • i Top of lower patch at 6944' , I i . I I _ I= ! ,-, i I e.44, :7■4;':1.1-'4,4! !I kkii 1--------------.--- - 1 4 1 ' "" -1:111111111 ■44 Bottom of lower patch at 6964' 7 r • • Well Name P-13 Job Scope MITIA WBL Cat Not Operable Cost 3000 Well Type WAG AFE APBWEINR Date 8/16/2013 IOR 40 Engineer Scott Warner Phone 907-564-5865 Job Objective L MIT-T to 3500 psi. MIT-la to 4000 psi. Hold 3500 psi on tbg during MIT-IA to protect patches. If fail, get LLR. If MIT-T fails, cancel MIT-IA. Fullbore Pumping Schedule Stage Fluid Type Pump Volume Rate Max Into (bbls) (bpm) Pressure L MIT Diesel Tbg 134 3500 MIT Diesel IA 10 J 4000 Select Select Fluid Stage Type Select Select Select Fluid Stage Type Select Select Select Fluid Stage Type Select Detailed Pumping Procedure dsfasdasdf 1 PJSM. RU & PT lines to 4000 psi 2 Perform MIT-T to 3500 psi. 3 If test ok, perform MIT-IA to 4000 psi. 4 RDMO 5 6 8 Regg, James B (DOA) ]�lo litto From: AK, D &C Well Integrity Coordinator [AKDCWeIIIntegrityCoordinator @bp.com] r Sent: Friday, December 21, 2012 5:38 PM � (Z-1241t Z-- To: Regg, James B (DOA); Wallace, Chris D (DOA); AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr Cc: AK, D &C DHD Well Integrity Engineer; AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); Climer, Laurie A Subject: NOT OPERABLE: Injector P -13 (PTD #1901110) Due for Compliance MIT -IA on 12/29/2012 All, Injector P -13 (PTD #1901110) is currently shut in for drilling that is ongoing on well P -17. The well is due for its 4 year compliance testing on 12/29/2012. As the well will continue to be shut in until the rig work is completed, the well is reclassified as Not Operable until such time that it is ready to be placed back on injection. Plan forward: 1. Fullbore: MIT -IA to 2500 psi prior to beginning injection 2. Operations: Place well on injection classified as Under Evaluation 3. Fullbore: Once the well is thermally stable, perform a witnessed AOGCC MIT -IA Please call if you have any questions. Thank you, Gerald Murphy SCANNED APR 11 2013 BP Alaska - Well Integrity Coordinator GVV Global Weir Organizatio € WIC Office: 907.659.5102 WIC Email: AKDCWe1IIntegrityCoordinator (a,BP.com 1 ALA. OIL AND GAS CONSERVATION COMAION RECEIVED REPORT OF SUNDRY WELL OPERATIONS - !, 7 2 012 1. Operations Abandon Li Repair Well U Plug Perforations Li Perforate U OthAOGZOTWATER Performed: Alter Casing ❑ Pull Tubing ❑ Stimulate - Frac ❑ Waiver ❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Stimulate - Other ❑ Re -enter Suspended Well ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development ❑ Exploratory ❑ 190 -111 -0 3. Address: P.O. Box 196612 Stratigraphic ❑ Service 0 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 22080 -00 -00 7. Property Designation (Lease Number): ,, 8. Well Name and Number: ADL0028288 PBU P -13 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 9500 feet Plugs measured None feet true vertical 9P12 feet Junk measured None feet Effective Depth measured 9265 feet Packer measured 8737 feet true vertical 9025.39 feet true vertical 8584.1 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 73 20" Conductor 37 - 110 37 - 110 0 0 Surface 2672 10 -3/4" 45.5# L -80 36 - 2708 36 - 2708 5210 2480 Intermediate None None None None None None Production 8998 7 -5/8" 29.7# L -80 35 - 9033 35 - 8831.65 6890 4790 Liner 710 5 -1/2" 17# L -80 8790 - 9500 8628.21 - 9212.84 7740 6280 Perforation depth Measured depth See Attachment feet tOLMINED AUG 1 3 Z- True Vertical depth See Attachment feet Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 34 - 8794 34 - 8631.54 Packers and SSSV (type, measured and true vertical depth) 4 - 1/2" Baker SAB Perm PE 8737 8584.1 Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 247 340 167 Subsequent to operation: 0 0 1057 320 616 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory ❑ Development ❑ Service 0 Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ❑ Gas u WDSPL ❑ GSTOR ❑ WINJ ❑ WAG 0 GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Prepared by Nita Summerhays 564 -4035 Printed Name Nita Summer -ys Title Petrotechnical Data Technician t 4 Signatur -,..�� g ,,J iii /, -���~ Phone 564 -4035 Date 8/7/2012 Form 10-404 Revised 10/2010 0MS AUG 0 9 202 WO. l Submit Original Only • • Daily Report of Well Operations ADL0028288 AC IVI o A , • , an • • y or wtnc ruc o move s i • rom o 6/5/2012 ** *Continue to 6-6 -12 WSR * ** Continued from 06 -05 -2012 WSR ( Bnghtwater Reservoir Sweep Mod) SB for well to be put on injection 6/6/2012 Continue on 06 -07 -12 ** *Continued from 06 -06- 2012 * ** Standby for well to stabilize 6/7/2012 ** *Continue on 06 -08 -2012 WSR * ** 110 = 595/300/50 Continued from 06 -07 -2012 WSR Temp =Hot (Bnghtwater Reservoir Sweep Mod) Start pumping brightwater chemicals down TBG while well is injecting @ 1200 bwpd. Pumped 155.5 gal. EC9360A (Surfactant) Average of 7.4 gph for 21 hrs. Pumped a total of 155.5 gal. since start of project. Pumped 606 gal. EC9378A ( Polymer) Average of 28.8 gph for 21 hrs. Pumped a total of 606 gal. since start of project 6/8/2012 ** *Continued on 06 -09 -12 WSR * ** 110 = 608/300/50 Continued from 06 -08 -2012 WSN Temp =Hot (Bnghtwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 1000 bwpd. Pumped 161 gal. EC9360A (Surfactant) Average of 6.7 gph for 24 hrs. Pumped a total of 316.5 gal. since start of project. Pumped 714 gal. EC9378A ( Polymer) Average of 29.75 gph for 24 hrs. Pumped a total of 1320 gal. since start of project 6/9/2012 ** *Continued on 06 -10 -12 WSR * ** 110 = 652/300/50 Continued from 06-0-2012 WSR Temp =Hot ( Bnghtwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 1000 bwpd. Pumped 134.5 gal. EC9360A (Surfactant) Average of 5.6 gph for 24 hrs. Pumped a total of 451 gal. since start of project. Pumped 729.5 gal. EC9378A ( Polymer) Average of 30.3 gph for 24 hrs. Pumped a total of 2049.5 gal. since start of project 6/10/2012 Continued on 06 -11 -2012 WSR TIO = 783/300/50 Continued from 06 -10 -2012 WSR Temp =Hot ( Bnghtwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 1200 bwpd. Pumped 181.5 gal. EC9360A (Surfactant) Average of 7.5 gph for 24 hrs. Pumped a total of 632.4 gal. since start of project. Pumped 754.5 gal. EC9378A ( Polymer) Average of 31.4 gph for 24 hrs. Pumped a total of 754.5 gal. since start of project 6/11/2012 Continued on 06 -12 -2012 WSR 110 = 543/300/50 Continued from 06 -11 -2012 WSR Temp =Hot (Bnghtwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 1200 bwpd. Pumped 231 gal. EC9360A (Surfactant) Average of 9.6 gph for 24 hrs. Pumped a total of 863.5gal. since start of project. Pumped 747 gal. EC9378A ( Polymer) Average of 31 gph for 24 hrs. Pumped a total of 3551 gal. since start of project 6/12/2012 Continued on 06 -13 -2012 WSR 110 = 620/320/40 Continued from 06 -12- 2012 WSN Temp =Hot (Bnghtwater Reservoir Sweep Mod) Started pumping brightwater chemicals down TBG while on water injection @ 1200 bwpd. Pumped 213 gal. EC9360A (Surfactant) Average of 8.875 gph for 24 hrs. Pumped a total of 1077 gal. since start of project. Pumped 777 gal. EC9378A ( Polymer) Average of 32.375 6/13/2012 gph for 24 hrs. Pumped a total of 4328 gal. since start of project 110 = 620/320/40 Continued from 06 -13 -2012 WSR Temp =Hot (Bnghtwater Reservoir Sweep Mod) Started pumping brightwater chemicals down TBG while on water injection © 1200 bwpd. Pumped 198 gal. EC9360A (Surfactant) Average of 8 gph for 24 hrs. Pumped a total of 1269 gal. since start of project.Pumped 753 gal. EC9378A ( Polymer) Average of 31.375 gph for 6/14/2012 24 hrs. Pumped a total of 5081 gal. since start of project TIO = 620/320/60 Continued from 06 -14 -2012 WSR Temp =Hot ( Bnghtwater Reservoir Sweep Mod) Started pumping brightwater chemicals down TBG while on water injection © 1200 bwpd. Pumped 242 gal. EC9360A (Surfactant) Average of 10.08333 gph for 24 hrs. Pumped a total of 1514 gal. since start of project.Pumped 748 gal. EC9378A ( Polymer) Average of 31.166 6/15/2012 gph for 24 hrs. Pumped a total of 5829 gal. since start of project • • TIO = 611/320/60 Continued from 0645-2012 WbR Temp =Hot (Bnghtwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 1200 bwpd. Pumped 210 gal. EC9360A (Surfactant) Average of 8.75 gph for 24 hrs. Pumped a total of 1726 gal. since start of project. Pumped 744 gal. EC9378A ( Polymer) Average of 31 gph for 24 6/16/2012 hrs. Pumped a total of 6571 gal. since start of project 110 = 643/320[60 Continued from 06 -16 -2012 WSR Temp =Hot (Bnghtwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection © 1200 bwpd. Pumped 227 gal. EC9360A (Surfactant) Average of 9 gph for 24 hrs. Pumped a total of 1953 gal. since start of project. Pumped 821 gal. EC9378A ( Polymer) Average of 34.2 gph for 24 hrs. Pumped a total of 7394 gal. since start of projectNote: GC2's Injection rate on P -13 fluctuated through out the day, adjustment where made to the Polymer and Surfactant as needed to 6/17/2012 keep target rate per water rate (BWPD). TIO = 660/320/TO0 Continued from 06-1T-2012 WSR Temp =Hot ( Bnghtwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 1200 bwpd. Pumped 189 gal. EC9360A (Surfactant) Average of 11.1 gph for17 hrs. Pumped a total of 2143 gal. since start of project. Pumped 609 gal. EC9378A ( Polymer) Average of 43.5 gph for 17 hrs. Pumped a total of 8003 gal. since start of project Finished Bright Water Injection @ 14:40. Overall Polymer avg =8.4, Overall Surfactant avg =31.8 SD Polymer @ 14:40, flushed line. SD Surfactant and Polymer flush @ 16:00. SD surfactant flush © 17:00. Blow down line 6/18/2012 RDMO. FWP= 750/320/80 SV =C, SSV,MV =0 IA &OA =OTG 171/0 = 600/300/100. Temp = 130 °. WHP's (DIC). On lnj. 6/25/2012 SV = Closed. WV, SSV, MV = Open. IA & OA = OTG. NOVP. 22:20 FLUIDS PUMPED BBLS 1 DIESEL 1 METH 2 TOTAL FLUIDS PUMPED GALS 2094.5 EC -9360A SURFACTANT 7812 EC -9378A POLYMER 9906.5 TOTAL . • Perforation Attachment ADL0028288 Perf Opera Meas Meas SW Operation tion Depth Depth TVD Depth TVD Depth Name Date Code Top Base Top Base P -13 4/7/91 APF 9190 9247 8963.27 9010.61 P -13 7/9/91 RPF 9190 9225 8871.27 8900.43 P -13 7/10/91 SPS 9200 9386 8879.63 9030.72 P -13 10/23/91 SPR 9200 9377 8879.63 9023.61 P -13 12/15/90 PER 9247 9257 8918.61 8926.83 P -13 12/15/90 PER 9264 9286 8932.57 8950.53 P -13 11/3/95 SPS 9265 9386 8933.39 9030.72 P -13 12/15/90 PER 9290 9294 8953.79 8957.04 P -13 12/15/90 PER 9305 9320 8965.96 8978.08 AB ABANDONED MIR REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP PULLED MLK MECHANICAL LEAK BRIDGE OPEN BPS PLUG SET OH HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF TREE = 4" CW • WELLHEAD = FMC SAFETY NOTES: H2S READINGS AVERAGE 125 ppm ACTUATOR = OTIS P -1 3 WHEN ON MI. WELL REQUIRES A SSSV WHEN ON KB. ELEV = 91.83' MI. HES PATCH 4400 PSI BURST; 4990 PSI COLLAPSE BF. ELEV = 54.78' I KOP = 6883' Max Angle = 38° 937$' I 2081' H4 -1/2" OTIS SSSV NIP, ID = 3.813" I Datum MD = 9105' Datum 1VD = 8800' SS 1 10 3/4" CSG, 45.5 #, L80, ID = 9.953" —I 2708' GAS LIFT MANDRELS ST MD 1VD DEV TYPE VLV LATCH FORT DATE 5 3102 3010 0 CAMCO DMY BK 0 03/13/94 Minimum ID = 2.313" @ 8776' 4 5377 5285 0 CAMCO DMY BK 0 03/13/94 2 -7/8" REDUCING NIPPLE 3 7177 7075 16 CAMCO DMY BK 0 03/13/94 2 8587 8367 32 CAMCO DMY BK 0 11/21/90 1 8693 8456 34 CAMCO DMY BK 0 03/13/94 I4 -1/2" HES PERM PATCH, ID = 3.25" (09/19/94) 1-1 8661' -8672' 1 1 8726' —14-1/2" PKR SWS NIP, ID = 3.813" 1 1 8736' —' K -22 ANCHOR SEAL ASSY 1 8737' H7 -5/8" x 4-1/2" BKR SAB PKR, ID = 4.0" I 8741' I- 5.1/2" MILLOUT EXTENSION, ID = 4.75" I 8747' —15 -112" x 4 - 1/2" X0, ID = 4.0" 8755' — I4 -1/2" PKR SWS NIP, ID = 3.813" 8776' — 14-1/2" OTIS XN NIP, ID = 3.725" 8776' I _12 -7/8" REDUCING NIP SET IN XN NIP, ID = 2.313" l 4 -12" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" 8787' I 8787' I 15 -1/2" XO BKR SEAL ASSY W/O SEALS (TOP OF 5 -12" BKR LNR H 8790' I 1 878W I-{ ELMD TT LOGGED 07/11/91 1 7 -5/8" CSG, 29.7 #, NT -95HS, ID = 6.875" 1-1 9033' I • 1 PERFORATION SUMMARY 9096' — IMARKER JOINT I REF LOG: ATLAS BHCA ON 09/11/90 ANGLE AT TOP PERF: 33° @ 9190' I Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL OprVSgz DATE 9265' IHCARBOLITE SANDBACK PLUG (11/03/95) 3 -3/8" 6 9190 - 9247 0 04/07/91 3 -3/8" 4 9247 - 9257 0 12/15/91 3 -3/8" 4 9264 - 9286 C 11/03/95 3 -3/8" 4 9290 - 9294 C 11/03/95 3 -3/8" 4 9305 - 9320 C 11/03/95 1 PBTD H 9419' I AWSW■ 1 5 LNR, 17 #, L - 80, .0232 bpf, ID = DATE REV BY COMMENTS DATE REV BY CONVENTS PRUDHOE BAY UNIT 11121190 CWJ ORIGINAL COMPLETION 01/18/12 TMN/JMD ADDED H2S SAFETY NOTE WELL: P -13 12/27/01 RN/TP CORRECTIONS PERN%T No 190 -1110 03/06/07 AK/TLH PERF CORRECTIONS AR No 50 -029- 22080 -00 01/14/09 RPH/SV PATCH CORRECTION SEC 31, T11 N, R13E 01/14/09 /SV CORRECTION 02/10/11 MB/JMO ADDED SSSV SAFETY NOTE BP Exploration (Alas ka) • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 0 Anchorage, Alaska 99519 -6612 August 22, 2011 - RECEIVED' Mr. Tom Maunder AUG Alaska Oil and Gas Conservation Commission �{T1liljal/ 333 West 7 Avenue O9 G� � � Anchorage, Alaska 99501 Anctrler Subject: Corrosion Inhibitor Treatments of GPB P -Pad , �' ) l Dear Mr. Maunder, eq � ; Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB P- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) P -Pad Date: 07/21/11 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal P -01 1920920 500292228700 0.30 NA 0.30 NA 0.85 4/24/2010 P -02A 2000840 500292237601 0.30 NA 0.30 NA 4.25 4/25/2010 P -03A 1972280 500292217601 12.70 5.0 0.30 7/12/2010 2.55 8/5/2010 P -04 1910760 500292218000 1.80 NA 1.80 NA 15.30 4/25/2010 P -05A 2000510 500292254501 0.80 NA 0.80 NA 5.95 4/25/2010 P -06B 2051380 500292216602 11.30 3.0 1.00 7/12/2010 9.35 8/5/2010 P -07A 2011960 500292253501 0.50 NA 0.50 NA 1.70 4/24/2010 P -08A 2000850 500292237701 0.10 NA 0.10 NA 0.85 4/24/2010 P -09 1930580 500292236200 0.10 NA 0.10 NA 0.85 4/24/2010 P -10 1910520 500292215800 3.00 NA 3.00 NA 28.05 4/24/2010 P -11 1910290 500292214300 3.00 NA 3.00 NA 23.80 4/23/2010 P -12B 2001330 500292213602 0.30 NA 0.30 NA 0.85 4/23/2010 P -13 1901110 500292208000 0.30 NA 0.30 NA 1.70 4/23/2010 P -14 1910070 500292212900 7.50 NA 7.50 NA 56.10 7/21/2011 P -16 1901630 500292211300 4.30 NA 4.30 NA 37.40 4/22/2010 P -17 1901550 500292210500 8.00 NA 8.00 NA 89.30 4/28/2010 P -19 1901360 500292209400 0.80 NA 0.80 NA 5.10 4/21/2010 P -206 2001590 500292208902 0.20 NA 0.20 NA 0.85 4/21/2010 P -21B 1970640 500292214802 0.40 NA 0.40 NA 4.30 4/21/2010 P -22 1931210 500292239600 0.30 NA 0.30 NA 1.70 4/23/2010 P -23 1931120 500292239300 0.30 NA 0.30 NA 0.85 4/24/2010 P -24 1970540 500292275500 1.80 NA 1.80 NA 8.50 4/24/2010 P -25 1970260 500292274200 64.00 24.0 2.60 7/17/2011 23.80 7/20/2011 P -26 1962000 500292272700 2.60 NA 2.60 NA 22.10 4/25/2010 P -27 2040500 500292320300 1.00 NA 1.00 NA 6.80 4/25/2010 P -28 2100480 500292342500 1.20 NA 1.20 NA 10.20 8/7/2010 MEMORANDUM To: Jim Regg P.I. Supervisor (~ ~ ~ (~~Z~~~ FROM: Jeff Jones Petroleum Inspector • State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, .ianuary 05, 2009 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC P-l3 PRUDHOE BAY UNIT P-13 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv,~'~~- Comm Well Name: PRUDHOE BAY UNIT P-13 API Well Number: so-oz9-22oso-oo-oo Inspector Name: Jeff Jones Insp Num' mitJJ08 1 230 1 01 93 1 Permit Number: 190-III-0 / Inspection Date: t2i29i2oo8 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well ~ P-13 ~TYPe InJ. w ~I TVD I 8584 '~ j ~~ 340 ~, 4000 - i 3940 3920 P ~+ i 1901110 TypCTCSt SPT Test pSl ~ 2]46 '~ OA 0 300 300 ~~~ 300 ~~ Interval 4YRTST P~F P TUhing j 850 I 850 II i 850 850 Notes' ~ BBLS methanol pumped. 1 well inspected; no exceptions noted. • i ~ ~~ t^v+rr~v~~~ L ~l ~ ~ f ct ~ U ti Monday, .Ianuary 05, 2009 Pale 1 of 1 ~ Oil &. (~m$, Q)mmi~~l1 Nõ:3982 A~ Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Scllfumbergep Alaska Data & Consulting Services 2525 Gambe" Street, Suite 400 Anchorage, AK 99503·2838 ATTN: Beth u\~ D¡û--IJ ì .~. REC IVE OCT ], 0 2006 Field: Prudhoe Bay C D 10106/06 Well Job# Loa Descriøtion Date BL olor C 3-29/J-32 11414759 SBHP SURVEY 09/04/06 1 L4·10 11285941 MEM PROD PROFILE 09/15/06 1 L2-21A 11421023 LDL 09/11/06 1 C-18A 11285934 MEM PROD & INJECTION 07/29/06 1 Y-24 N/A INJECTION PROFILE 09/03/06 1 l-31 11414379 INJECTION PROFILE 09/04/06 1 S-27B 11285940 MEM PROD PROFILE 09/14/06 1 P-13 11414277 INJECTION PROFILE 09/03/06 1 X-33 11421024 LDL 09/12/06 1 l-19A N/A MDT 09/08/06 1 A-17 11414381 USIT 09/07/06 1 X-01 11422961 USIT 09/09/06 1 H-04A 11285942 SCMT 09/17/06 1 15-39A 11212888 SCMT 09/16/06 1 C-09A 11209608 MCNL 06/16/06 1 1 C-18A 11285934 MCNL 07/29/06 1 1 l-14B 40013765 OH EDIT OF MWD/LWD 07/31/06 1 1 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 SC/\NNE~) (ì Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth . . MEMORANDUM ) State of Alaska ) Alaska Oil and Gas Conservation Commission TO: Jim Regg P.I. Supervisor K't{ 2/-";/05' DATE: Wednesday, January 05, 2005 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC P-13 PRUDHOE BAY UNIT P-13 ,00'/ \ll \ ' FROM: Lou Grimaldi Petroleum Inspector Src: Inspector Reviewed By: P.I. Suprv :fBf'- Comm NON-CONFIDENTIAL Well Name: PRUDHOE BAY UNIT P-13 Insp Num: mitLG050102223849 Rei Insp Num: API Well Number: 50-029-22080-00-00 Permit Number: 190-111-0 Inspector Name: Lou Grimaldi Inspection Date: 1/1/2005 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well P-l3 Type Inj. N TVD 7220 IA 480 2350 2260 2230 P.T. 1901110 TypeTest SPT Test psi 1805 OA 0 0 0 0 Interval OTHER P/F P Tubing I 1540 1540 1540 1540 Notes: Initial test after tubing patch installed fl\u..r-r ~ IAR .,f "' ")f.\.f\;: SCl~\n~~~EJ.r n'1 :\.1 1. f-U L"t.~J Wednesday, January 05,2005 Page 1 of 1 THE MATER/AL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE OCTOBER 27, 2000 E P M L E W A T E R IA L U N D ER TH IS M ARK ER C:LOR.~MF~M.DOC STATE OF ALASKA : A KA OIL AND GAS CONSERVATION COMMIS~---?_~] REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate__ Pull tubing__ Alter casing Repair well__ Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) 91.89 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 8. 2784'SNL,2834'WEL, SEC. 31, T11 N, R 13E At top of productive interval 1867'SNL,2570'WEL, SEC. 31, T11 N, R 13E At effective depth 1684'SNL,2522 'WEL, SEC. 31, T11N, R 13E At total depth 1684'SNL, 2522'WEL, SEC. 31, T11 N, R 13 E Well number P-13 (32-31-11-13) 9. Permit number/approval number 90-111 / 10. APl number 50- 029-22080 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110' Surface 2671' Intermediate 8996' Production -- Liner 9463' Perforation depth: measured 9500' feet Plugs (measured) 9213' feet 9417' feet Junk (measured) 9147' feet Size Cemented Measured depth 147' 1970 cuft C/ass G 2708' 1431 cuft C/ass G 9033' 20" 10-3/ 7-5/8" 5-1/2" 168 cuft C/ass G 924 7'-9257', 9264'-9286', 9290'-9294',9305'-9320' 8790'-9500' ORIGINAL True vertical depth BKB 147' 2708' 8832' 8628'-9213' true vertical subsea8918'-8926',8933'-8950',8954'-8957',8966'-8978' Tubing (size, grade, and measured depth) 4-1/2"12.6#L-80@8794' REE£1VED Packers and SSSV (type and measured depth) Packer@8736' SSSV@2081 13. Stimulation or cement squeeze summary 5/1/94 Converted well to water injector Intervals treated (measured) NOV 2 1 1994 0il ~ t~a~ Cons. Comnlission Anchorage Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Water In_lector 17. I hereby certify that the foreg,qing is true and correct to the best of my knowledge. Form 10-40z~ Rev 06/15/88 / Date SUBMIT IN DUI~LICATI~ LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 5 October 1994 Transmittal of Data Sent by: U.S. MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PL/INJPROF. FINAL BL 1 PL/INJPROF. RF SEPIA 1 PL/INJPROF. FINAL BL 1 PL/INJPROF. RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA Run # 1 Run ~ 1 Run # 1 Run ~ 1 Run # 1 Run # 1 Run # 1 Run ~ 1 ECC No. 5025.04 6106.06 6123.02 6275.01 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, ~ 99518 Attn..~Ro~ney D. Paulson LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 26 September 1994 RE: '~ Transmittal of Data Sent by: U.S. MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 CCL/TUB FINAL BL 1 CCL/TUBPAT. RF SEPIA 1 GR/CCL FINAL BL 1 GR/CCL FINL.RF SEPIA 1 PLS/INJPROF.FINAL BL 1 PLS/INJPROF.RF SEPIA ECC No. Run # 1 1991.05 Run # 1 Run # 1 5025.03 Run # 1 Run # 1 5157.05 Run # 1 Run # 1 5716.03 Run # 1 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 / ~ Anc]lorage, AK 99518 At Received RECEIVED OCT 05 1994 Alaska 0il & Gas Cons. Co~nmi$$lon- Anchorage . ~/~.~~ney D. Paulson Date: ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 23 August 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ECC No. 1 PL/GASENTRY FINAL BL 1 PL/GASENTRY RF SEPIA Run ~ 1 2621.06 Run ~ 1 ~'[R( C-24 (14-19-11-14) I PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA Run ~ i 3457.05 Run ~ 1 ¢0- ((' c-17 1PL/GASENTRY FINAL BL Run ~ 1 i PL/GASENTRY RF SEPIA Run # 1 3564.01 ~-~% E-06 (33-6-11-14) 1CN/GR FINAL BLUELINE Run ~ 1 i CN/GR FINAL RF SEPIA Run ~ i 3573.02 ~-<~/ W-37 (24-21-11-12) i PL/GASENTRY FINAL BL Run ~ 1 I PL/GASENTRY RF SEPIA Run ~ i 5010.03 ?b- r[[ P-13 1 PL/LEAKDET. FINAL BL i PL/LEAKDET. RF SEPIA Run ~ 1 Run # 1 5025.02 i GR/CCL JEWL.FINAL BL i GR/CCL JEWL.RF SEPIA Run # 1 Run ~ 1 5157.02 i PL/PROFILE FINAL BL i PL/PROFILE RF SEPIA Run # 1 Run ~ 1 5602.02 i PL/PROFILE FINAL BL 1 PL/PROFILE RF SEPIA Run ~ 1 Run ~ i 6158.05 Cont/ Please sign and return to: Petrotechntcal Data Center BP Exploration (Alaska) 900 East Benson Boulevard Anchorage, Alaska 95908 RECEIVED / UG 2 5 A/aska Oil & Gas Cons. Commission Anchorage Received by STATE OF ALASKA ALA," OIL AND GAS CONSERVATION COMMISSI¢ REPORT O'F SUNDRY WELL OP i ATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well __ Perforate__ Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2784'SNL,2834'WEL, SEC. 31, T11N, R13E At top of productive interval 1867'SNL,25 70'WEL, SEC. 31, T11N, R 13E At effective depth 1684'SNL,2522'WEL, SEC. 31, T11N, R 13E At total depth 1684'SNL,2522'WEL, SEC. 31, T11N, R13E 5. Type of Well: Development X Exploratory Stratigraphic Service OR!8tNAL 6. Datum elevation (DF or KB) 91.89 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number P-13 (32-31-11-13) 9. Permit number/approval number 90-111 / 10. APl number 50- 029-22080 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110' Surface 2671' Intermediate 8996' Production -- Liner 9463' Perforation depth: measured 9500' feet Plugs (measured) 9213' feet 9417' feet Junk (measured) 9147' feet Size Cemented Measured depth 20" 147' 10-3/ 1970 cu fl C/ass G 2708' 7-5/8" 1431 cu ft C/ass G 9033' 5-1/2" 168 cuft Class G 924 7'-9257', 9264'-9286', 9290'-9294', 9305'-9320' 8790c9500' true vertical subsea8918'-8926',8933'-8950',8954'-8957',8966'-8978' True vertical depth BKB 147' 2708' 8832' 8628'-9213' Tubing (size, grade, and measured depth) 4-1/2"12.6#L-80@8794' Packers and SSSV (type and measured depth) Packer@8736' SSSV@2081 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED & 6as Cons. Oommissio~ Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 730 357 42 985 520 ~ 166 324 1010 Tubing Pressure 288 301 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby .certify that the foregoing is true and correct to the best of my knowledge. Signed ~,~"/i~,L (~i_ '~~~ Title SeniorTechnica/Assistantl Form 10-40~ Rev 06/15/88 / - Date SUBMIT IN DUtSLIC'ATE 7/28/93 12/16/93 WELL P-13(32-31-11-13) Stimulation Operation A HCL Acid Wash Treatment was performed using the following fluids: Objective Cleanout well below bottom perforation or as deep aa possible, then follow up with a 1500 gallon perforation wash with 15% HCI Xylene. Bottom perforation is 9320' BKB. Last TD tag was 9213' corr. WLMD on 7/25/93. Summary Cleaned out well down to 9,394' CTMD. During cleanout, well was on production at full open choke, with 2.7 MMSCFD GLG. Fill cleaned out in 40' intervals (500 #) with slugs of 10 bbls of Biozan, and chased up above the bottom GLM with sea water. Found hard bottom at 9394' (74' MD below bottom perforation). Made a final sweep with 20 bbls of Biozan, and chased out of the hole up to 3,000'. Jetted all GLMs clean by reciprocating across them while Shut in GLG and close wing. Pump in to kill well while running in hole for acid wash. Pump 40 bbl 15% HCI Xylene with additives at 2 BPM, while reciprocating nozzle across perforations at about 30 fpm. Let acid soak for 10 minutes, and return to production at 1.0 MMSCFD GLG. Fluids Pumped Down Well Bbl Description 610 Sea Water 70 Biozan 40 15% HC1 Xylene with additives RECEIVED J .JN 15 1994 A 5% HCL Acid Wash Treatment was performed using the following fluids: Gas Cons. Cornm/ssior, Anchorage SUMMARY 1. RIH WITH 3.0" JET/SWIRL NOZZLE, TAG TD AT 9410 FT CTD, THIS WAS VERY CLOSE TO THE CLEANOUT DEPTH OF 9394 FT CTD DONE IN 7/28/93. BOTTOM 20 FT OF HOLE HAD OVERPULL. 12-17-93 2. JETTED WITH 55 BBL BIOZAN AND CHASED HIGH VISCOSITY SWEEP TO SURFACE WITH 210 BBL OF SW. FINAL FILL CLEANOUT DEPTH OF 9412 Fr CTD. FIRM TD, SO CLEANED OUT TO FLOAT COLLAR. SHUT IN WELL. 3. PUMPED 350 BBL, 5% HCL ACID AT 2.6 BPM WHILE MAKING 8 PASSES PAST ALL THE PERFS WITH THE NOZZLE. DID NOT SEE ANY CHANGE IN INJECTIVITY - NO APPARENT ACID STIM. RESPONSE, DISPLACED CT VOLUME WITH 26 BBLS OF SEAWATER. POOH. WELL SHUT IN. pAGE 2 wELL p.1302-31-11-13) 4. R/D CTU, POP WELL PdqD INFORM PCC TO BRING WELL ON AS PER FLUIDS pUMPED vol. 326 350 55 44 DESCRII~TION iltered Sea Water (Bbls) IICI (Bbls)125% XyI~NE with 4 GPT ACI-274, 4 GFT NE-41, 2 GPT MS-10, 25 pPT FERROTROL 210. BiOZ,~dq fjh 6/13/94 RECEIVED JUN 1,5 1994 A!sska Oil & Gas Cons. Commission Anchorage BP EXPLORATION October 19, 1993 BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Larry Grant Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Mr. Grant: Enclosed are the available materials that the AOGCC requested in your fax dated May, 1993o WELL LOG TYPE/TAPE (w/listing), SERVICE CO. BPX TAPE NO. DIU ~O--t~?~ 3-25/M-27 &SD55 GCT, Run 1 b-~Sd --'Sch., #74361 ~-- ~!5~ LWD-CDN/GR W/DLL-GR I;5~'3.5- I~tSq' --5~h., #74347 ~5~ 5~7 LWD-CDN/GR t ~t~--~q ~c~' ,~-~-~h., #74347 W07654 W07691 W07692 DIU q.o"-157 1 - 11/SN-04 ~ 5g3%-D~FL-GR/DLL/MLL/ZDL-CN/CAL 1%7~---J qS~O~,tlas, 3/30/91 J~ ¢-~53~GCT, Run 1 ~;;L-~lq-'~' Sch., #74487 EN0647 W07722 DIU 3-29/J-32 ~832~'~'R tztqo--l~ffo' Atlas, 12/31/90 ~ ~;zq ~EW~R/RLL/GRC/RHOB/CNP/ROP/DIR ~[?~, Sperry, #AKRB901254 ~- 5~o ~SffD I ?..t~o-I~' Sperry, 02/08/91 ~ ~8~ ~...T-DT-Borax, Run 2 1~.'~;-"~,~-("~-~'7 ' Sch.,#425542 EN0628 W07563 EN0631 W08059 ~__ 5~.-/ GCT/CET/CBT, Files 4, 7, 9, 13-16 - Sch., EN0637 -~ ~$2~>/T~T-P, Run 1, File.&l~C~ ~l Sch., 391489 W07911 ~ ~~T, Run 1 Kb~~ Sch., ~74424 W07698 BPX OPE~TED PBU pad wells OCT 1 9 1995 ~ ns. commiSSiO~ ~' ~ . Alak Oi Gas~0 . - -' PBU P-13, perm,t no. 90-111, reque~'~r ~~~tions. Thes~ere not found in the well file. There is no indication, from the wells drilling h~%~ ~hat any sidewall cores were ever obtained. PBU P-1 5, permit no. 9~-76, request for RFT sepia and blueline. No RFT was run for this well, however, an FMT/GR was run. We do not have copies of the FMT/GR in our well files and are trying to obtain them from Atlas wireline. PBU X-14A, permit no. 92-143, request for DLL/MLL/BH/AC/GR w/sepias and bluelines. This well was drilled and logged in Feb./March 1993. BPX has no OH logs for this well in the well files. Atlas was the logging company and they were unable to get downhole with wireline tools. Chris Barnette, Atlas service company representative, is trying to obtain information as to the availability of MWD logs for this well. BP EXPLORATION 8P Exploration (Alaska) Inc. 900 East Benson Boulevard RO. 8ox 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 "exist." It has not been-gh-~il~. Sorry about the delay and hopefully, in the future, we will have fewer data compliance issues to fulfill. If you have any questions, please don't hesitate to contact me. Sincerely, BPX Petro,technical Data Center EEEIVED :' .... STATE OF ALASKA '~ ~-~ Al KA OIL AND GAS CONSERVATION COMMIS, _,N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate_Z_ Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2784'SNL,2834'WEL, SEC.31, T11N, R 13E At top of productive interval 1867'SNL,2570'WEL, SEC.31, T11N, R 13E At effective depth 1684'SNL,2522'WEL, SEC.31, T11N, R13E At total depth 1684'SNL,2522'WEL, SEC.31, T11N, R13E 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) 91.89 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number P-13 (32-31-11-13) 9. Permit number/approval number 90-111/ 10. APl number 50- 029-22080 11. Field/Pool 9500'feet Plugs (measured) 92131eet 941Pfeet Junk (measured) 9147feet Prudhoe Oil Pool Casing Length Structural -- Conductor 110' Surface 2671' Intermediate 8996' Production -- Liner 9463' Perforation depth: measured Size Cemented Measured depth 2O" 147' 10-3/4 1970 cu ft Class G 2708' 7-5/8" 1431 cu ft Class G 9033' 5-1/2" 168 cuft Class G 8790'-9500' 9247'-9257', 9264'-9286', 9290'-9294', 9305'-9320' True vertical depth BKB 147' 2708' 8832' 8628~9213' true vertical subsea8918'-8926',8933'-8950',8954'-8957',8966'-8978' Tubing (size, grade, and measured depth) 4-1/2"12.6,¢ L-80@8794' Packers and SSSV (type and measured depth) Packer@8736' SSS V@2081 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 3OO 71 37 68O 3730 -" · 3702 591 1377 Tubing Pressure 2O9 319 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended__ Service 17. I hereby certify that the_foregojcg~ is true apd correct to the best of my knowledge. Signed %,~I .'~O/,~J/~.~ ~_] ~)~ ~,..~/~"~ Title Senior TechnicalAssistant I Form 10-404~Rev 06/15/88 // ' Date SUBMIT IN DUISLf'CAT~ 4/07/91 WELLP-1 3f32-31-1 I -1 31PBU Add Perf/HCL/Reperf/HydraulicFracturincjOperations A additional perforation was performed using 3 3/8" guns,4SPF,random orientation, and 120 degree phasing. 9190' - 9247' MD 4/11/91 A CTU HCL Stimulation was performed using the following fluids: 59.5 bbl 15% HCL/10% XYLENE 24 bbl METHANOL 7/09/91 A reperforation was performed using 3 3/8" guns, 6SPF,random orientaion and 60 phasing. 9190'- 9225' MD 7/1 4/91 Performed hydraulic fracture: Pumped 127000# 16/20 CL. pipe. Underflushed by 8 bbls. Fluids Pumped: DATA FRAC: 5 bbls 10#Gel to Check Tree Saver 51 bbls 1~5%HCL 175 bbls '10# GEL Flush 10 bbls 50# Gel Prepad 105 bbls X-link Gel w/410 Gal ESL 139 bbls 50#Gel Flush 50 bbls 50#Gel Spacer 170 bbls 50# Gel Step Rate 124000# behind fjh 10/22/92 FRAC: 65 bbls 50#GEL Prepad 112 bbls Pad w/540 GAL ESL 54 Dirty 1 PPG 16 Dirty 2 PPG 22 Dirty 3 PPG 25 Dirty 4 PPG 29 Dirty 5 PPG 30 Dirty 6 PPG 31 Dirty 7 PPG 35 Dirty 8 PPG 34 Dirty 9 PPG 278 Dirty 10 PPG 135 Dirty 50#-10# Gel Flush Alaska 0il & 6as Cons. Anchorage BP EXPLORATION BP Exploration {Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :07/25/91 T#:82666 FROM: Information Control Well Records LR2-1 SUBJECT: E~P CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-dddS. H-15 ll.-Gt -P-O6 ~0-ll [ Z, P-13 R-16 R-21 S-07 S-07 X-17 GR/CL 07/12/91 #1 10200-11673 Camco 5" 'iD TAG 07/16/91 #1 10144-10144 Camco 5" Jewelry Log 07/11191 #1 8650-9202 Camco 5" TD TAG 07/13/91 #1 8900-9231 Camco 5" Gas Lift Survey 07/16/91 #1 10900-11350 Camco 5" Gas Lift Survey 07/16/91 #1 9600-10358 Camco 5" GR/CL 07/14/91 #1 10350-11194 Camco 5" GR/CL 07/15-16/91 #1 10350-11194 Camco 5" Jewelry Log 07/13/91 #1 8800-981 2 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO- DISTRIBUTION Date :07/15/91 T#:82583 FROM: Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. M-07 al0'llt P-13 R0.'T¢-27 CCL 07/02/91 #1 8100-8400 Atlas 5" CL 07/09/91 #1 9000-9350 Atlas 5" Production Log 07/08/91 #1 10500-11140 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES dUL 2 ? 19{~1 AllChorage' C'crnrn /ss., o . BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION D ate :04/12/91 T#:82305 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below, if you have any questions, please contact BP Well Records at (907) 564-4,!.45. D-23 Completion 04/06/91 #1 10000-10478 Sch 5" F-30 TDT-P 04/09/91 #1 12040-12600 Sch 5" N-14 Completion 04/08/91 #1 8500-10104 Sch 5" N-16 Completion 04/07/91 #1 9110-10224 Sch 5" P-13 Perf 04/07/91 #1 9040-9345 Sch 5" Y-30 Per/ 04/09/91 #1 8690-9435 Sch 5" Y-33 CBT 04/08/91 #1 10630-11483 S ch 5" Y-33 CET 04/08/91 #1 10630-11507 Sch 5" Y-33 Digtial CET 04/08/91 #1 150-10630 Sch 5" . Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES ECEI VED 1 5 1991 Alaska Oil & 8as Cons. Commission Anchorage BP EXPLORATION March 14, 1991 David W. Johnston Chairman of Commission AOGCC 3001 Porcupine Drive Anchorage, AK 99501 BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 ........ FiLE Dear Mr. Johnston, Reference' Rule 20 AAC 25.035 P-13 was the first well drilled at P-pad. A 20" diverter system was used while drilling surface hole. P-13 and subsequent wells drilled at P-pad encountered no gas or abnormal pressures while drilling surface hole. Drilling experience on P-pad indicates that a diverter system in not necessary in drilling surface hole. Therefore, BP Exploration (Alaska) Inc. respectfully requests a waiver to Rule 20 AAC 25.035 requiring a diverter system. Sincerely, Bill Kirton Drilling Engineering Supervisor cc: Paul Chan ~ File 16.2 P-21 Well file BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO Date:09/17/90 CHEVRON T#:81655 EXXON MOBIL PHILLIPS TEXACO ~A ARCHIVES BP OPEN HOLE FINAL Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. ~P-13 4-Arm Caliper 09/12/90 #2 9037-9509 Atlas 5" '~- P-13 BHCA 09/08/90 #1 2713-8996 Atlas 2"/5" '~P-13 Dieelectric 09/12/90 #2 9037-9507 Atlas 5" '~ P-13 DIL 09/08/90 #1 2713-9025 Atlas 2"/5" \ P-13 FMT 09/12/90 #2 · 9052-9320 Atlas '"--P-13 SW Core 09/08/90 #1 3575-5634 Atals 2" ~ P-13 Z-Densilog Poro 09/12/90 #2 9037-9485 Atlas 5" '~-P-13 Z-Densilog Raw 09/12/90 #2 9037-9485 Atlas 5" *** GEOS/ARCO/EXXON/ARCHIVES ONLY. P-13 SS TVD 09/11/90 #2 Atlas 1 "/2" STATE ONLY: Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Date: Inforation Control Well Records LR 2-1 J.. Dietz/S. McCurry Job~: Jol:~: RECEIVED Anchorage 0 RIG I N ,4. L STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 11. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 90-111 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 s0- 029-22080 4. Location of well at surface ~ ,:../ -: ~:.- ......... 9. Unit or Lease Name At Total Depth Prudhoe Bay Field/Prudhoe Bay Pool 1684' SNL, 2522' WEL, SEC. 31, T11N, R13E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Sedal No. 91.83 KBE I ADL 28288 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, ff offshore ]16. No. of Completions 8-28-90 9-11-90 12-15-90I N/A feet MSL ] One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)19. Directional Survey J20. Depth where SSSV set J21. Thickness of Permafrost I 9500'MD/9213'TVD 9417'MD/9147'TVD YES [] NO [] 2081 feet MD J 1970' 22. Type Electric or Other Logs Run DIL/SONIC/GR/SP, CNL/LDT/DEL2/GR, 4 arm caliper, RFTs, Sidewall cores 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER Fr. GRADE TOP BO'CFOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20 Cond. Surface 110' 10-3/4" 45.5# NT-80 Surface 2708 13-1/2" 1970 cuft Permafrost 7-5/8" 29. 7# L-80 Surface 9033 9-7/8" 1431 cu fl Class G 5-1/2" 17# L-80 8790' 9500 6-3/4" 168 cuft Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Schlumberger 3-3/8"@ 4 spf 4-1/2" 12.6# 8794' 8736' MD TVDSS 9247'- 9257' 8918'- 8926' L-80 9264'- 9286' 8933'- 8950' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9290' - 9294' 8954' - 8957' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9305'- 9320' 8966'- 8978' 10-3/4" X 7-5/8" Freeze protect annulus with 110 bbls annulus Diesel 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 12-17-90 I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE S~ZE ]GAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pressure ~ALCUI_^IED OII-BBL GAS-MCF VVATER-BBL Oil GRAVITY-APl {corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED FEB - 5 t991 Alaska 0il & Gas Cons. C0mm'ts$[0~ Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS -~,MATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 9039 8836 Shublik A 9067 8860 Zone 4 9181 8956 31. LIST OF ATTACHMENTS Signed _25~--,',--~ [ f ~ Title PBU Lead Eng_in~r Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Monday, August 27, 1990 WELL: P-13 (32-31-11-13) Day: -4 Depth at 0600 Hrs. = 0 72 Hour Footage = 0 PRUDHOE BAY UNIT RIG: ALASKA UNITED #2 APl No. 50-029-22080 AFE Number: 125261 AFE Amount = Current Field Cost = Estimated Final Cost = Current Operation: Moving rig. Summary of Last 72 Hours: Moving dg to P-13. Mud Type Mud Weight Viscosity #/gal Sec. Survey ~ Angle TVD PV YP Fluid Loss Solids Temp cc °F N-S E-W Dog Leg Section Coordinate Coordinate 0/100' Reviewed By: A/Tcborage °remiSsion BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Tuesday, August 28, 1990 WELL: P-13 (32-31-11-13) BAY UNIT RIG: ALASKA UNITED #2 Day: -5 Depth at 0600 Hrs. = 0 24 Hour Footage = 0 APl No. 50-029-22080 AFE Number: 125261 AFE Amount = Current Field Cost = Estimated Final Cost = Current Operation: Mixing spud mud. Summary of Last 24 Hours: Moved rig on P-13. Accepted rig @ 0001, 8-28-90. Mud ,,'['._vpe Mud Weight Viscosity P V YP Spud Mud Cf/gal Sec. Fluid Loss ,Solids Temp cc °F Survey Deoth Anale Direction TVD N-S E-W Doa Lea -- -- Section Coordinate Coordinate. °/100' Reviewed By: .-~ ,~ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, August 29, 1990 WELL: P-13 (32-31-11-13) RIG: ALASKA UNITED #2 Day: 1 Depth at 0600 Hrs. = 1009 24 Hour Footage = 899 Current Operation: Summary of Last 24 Hours: APl No. 50-029-22080 AFE Number: 125261 AFE Amount = Current Field Cost = Estimated Final Cost = , Drilling 13-1/2" surface hole. Mixed spud mud and spud hole @1430 hrs, 8/28/90. Mud Type , Spud Mud Mud Weight ,Viscosity PV, Yp FIpjd Loss Solids 9.1 #/gal 175 Sec. 20 48 12.8 cc 6% Temp 61 OF Survey Deoth Anale -- Direction TVD N-S E-W Section CoQrdinate (~Qordinate °/100,' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, August 29, 1990 WELL: P-13 (32-31 11-13) RIG,' ALASKA UNITED #2 Day: 2 Depth at 0600 Hrs. = 2723 24 Hour Footage = 1714 APl No. 50-029-22080 AFE Number: 125261 AFE Amount = Current Field Cost = Estimated Final Cost = Current Operation: POH to run 10-3/4" surface casing. Summary of Last 24 Hours: Drilled and surveyed to 2723'. Mud Type Mud Weight Viscosity Spud Mud 9.3 Cf/gal 150 Sec. P V YP Fluid Loss Solids Temp 20 38 10.4 cc 5% 70 °F Survey Depth Angle Direction 'I'VD N-S E-W Doa Lea Section Coordinal;e Coordinate, °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, August 31, 1990 WELL: P-13 (32-31-11-13) Day: 3 Depth at 0600 Hrs. = 2723 24 Hour Footage = 0 PRUDHOE BAY UNIT RIG: ALASKA UNITED #2 , APl No. 50-029-22080 AFE Number: 125261 AFE Amount = Current Field Cost = Estimated Final Cost = Current Operation' Pedorming cement top job on 10-3/4" surface casing. Summary of Last 24 Hours: Ran 10-3/4" casing to 2708'. Performed a stab-in cement job but no cement returned to surface. ,MudType Mud Weiaht Viscosity P. V YP Fluid Loss Solids Spud Mud 9.4 #/gal 110 Sec. 18 25 10.8 cc 7.5% Temo 70 OF Survey De0th Angle. Directi0. n. TVD.. N-S E-W ~ Section Coordinate Coordinate 0/100' Reviewed By' SS BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Tuesday, September 4, 1990 WELL: P-13 (32-31-11-13) BAY UNIT RIG: ALASKA UNITED #2 Day: 7 Depth at 0600 Hrs. = 6600 96 Hour Footage = 3867 APl No. 50-029-22080 AFE Number: 125261 AFE Amount = Current Field Cost = Estimated Final Cost = Current Operation: POH for Dyna drill. Summary of Last 96 Hours: Finished top job on 10-3/4" casing. Drilled and surveyed to 6600'. Mud Type Mud Weight Viscosity p V Dispersed mud 9.9 #/gal 41 Sec. 11 YP. Fluid LOSS, .Solids 7 3.6 cc 9% Temp, 74 °F Survey .Depth Angle Direction TVD .N-S E-W Section Coordinate Coordinate Dog Leg °/100' Reviewed By: -z,./¢. BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: .P. RUDHOE BAY UNIT As of 0600 Hrs. Wednesday. September 5, 1990_ WELL: P-13 (32-31-11-13) APl No. 50-029-22080 Day: .8. Depth at 0600 Hrs. = 24 Hour Footage = 7,424 Ft. 824 Ft. Rig: AFE Number: AFE Amount -- Current Costs = Estimated Final Cost = Alaska United Rig.#2 125261 Current Operation: POH for changing BHA. Summary of Last 24. H0ur~' Drilled and surveyed 9-7/8" hole with Dyna Drill motor to 7,424'. Mud T_v.De Mud Weight Viscosity p V Dispersed mud 9.9 lC/gal 39 Sec. 1 2 Y__EP Fluid Loss Solids 8 3.8 cc 8% _Temp 89 OF Survey Deoth Anale ~ TVD -- N (+)/S (-) .E(+)/W(-) Section Coordinate Coordinate Dog Leg ?/100' Reviewed By: ~. H, BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday. Seotember 6. 1990 WELL: P-13 (32,-~1-11-13). APl No. 5O-O29-22O8O Day' 9 Depth at 0600 Hrs. = 24 Hour Footage = 8.073 Ft. 649 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = .Alaska United Rig #2 125261 Current Operation: POH. Summary of Last 24. Hours: Drilled and. surveyed 9-7/8" hole to 8073'. Mud Type Mud Weight Viscosity Dispersed mud 10 Cf/gal 43 Sec. pv Y._EP Fluid Loss Solids Temo 1 3 1 0 3.6 cc 10% 88 °F Survey Depth Angle Direction TVD N (+)/S (-) E(+)/W(-) Dog Leg Section Coordinate Coordinate °/100' Reviewed By: dh BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Friday, Septeml~er 7. 1990 WELL: P-13 (32-31-11-13), APl No. 50-029-22080 Day: 1 0 Depth at 0600 Hrs. = 24 Hour Footage = 8,652 Ft. 579 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #2 125261 Current Operation: POH for changing BHA. Cummary of Last 24. Hours: Drilled and surveyed 9-7/8" hole to 8652'. Mud Type Dispersed mud Mud Weight 10.2 #/gal Viscosity 43 Sec. PV YP Fluid Loss Solids 13 11 3.6cc 11% Temp 92 OF Survey Deoth An(~le Direction TVD N (+)/S (-) E(+)/W(-) SectiQn Coordinate Coordinate Dog Leg °/100' Reviewed By: ~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY,.UNIT As of 0600 Hrs. Monday. September 10. 1990 WELL: P-13 (32-31-11-13) APl No. ,~0-029-22080 Day: ,! 3 Depth at 0600 Hrs. = 72 Hour Footage = 9,040 Ft. 388 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #2 125261 Current Operation: RIH with 6-3/4" BHA. Summary of Last .72 Hours: Drilled and surveyed 9-7/8" hole to 9040'. Rig up and ran open hole logs: GR, SP, DIL, BHCS, and shot side wall cores. Ran and cement 7-5/8" casing @ 9033' (shoe depth). Rig up 6-3/4" BHA with 3-1/2" drill pipe. MudType Mud Weight Viscosity P V YP Fluid Loss Solids .Temp Dispersed mud 9.5 #/gal 31 Sec. 4 3 5.2 cc 8% 80 °F N (+)/S (-.) E(+)/W(-) Dog Leg Survey Depth Angle Direction TVD Section Coordinate Coordinate °/100' Reviewed By: d~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday. Seotember 11. 1990 WELL: P-13 (32-31-11-13) AP! No. 50-029-22080 Day: 1 4 Depth at 0600 Hrs. = 24 Hour Footage = 9,270 Ft. 230 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska, United Rig #2 125261 Current Operation' POH for bit. SUmmary of Last 24 Hours: Test 7-5/8" casing to 3000 psi, ok. Drill cement and float equipment. Drill 6-3/4" hole to 9270'. Mud Type Mud Weight Viscosity P ¥ YP Dispersed mud 9.5 #/gal 42 Sec. 11 10 Fluid Los~ Solids 4.5 cc 8% Temo 98 OF Survey Depth Anale Direction TVD N (+)/S (-) E(+)/W(-) Section Coordinate Coordinate Dog Leg o/100' Reviewed By: dh BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, Seotember 12. 1990 WELL: P-13 (32-31-11-1~) APl No. 50-029-22080 Day: 1,5 Depth at 0600 Hrs. = 24 Hour Footage = 9.500 Ft. 23O Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #2 12526,1 Current Operation' Running open hole logs. Summary_ of Last 24 Hours' Ddiled 6-3/4" hole to 9500' (TD). Rig up and run open hole logs. Mud TyDe Mud Weight Viscosity p .V, Dispersed mud 9.5 #/gal 43 Sec. 1 3 YP Fluid Loss Solids 10 3.9 cc 8% Temp 94 °F Survey Deoth A.EgJ.¢. i.~be..¢, JLg~ TVD N (+)/S (-) E(+)/W(-) Section Coordinate Coordinate Dog Leg o/100' Reviewed By: dh BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. WedneSday. September 12. 199,(} WELL: P-,!3, (32-31-11-13) APl No. 50-029-22080 Day: 1 5 Depth at 0600 Hrs. = 72 Hour Footage = 9,500 Ft. 230 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #2 125261 Current Operation: Running open hole logs. Summary_ of Last 72 Hours: Drilled 6-3/4" hole to 9500' (TD). Rig up and run open hole logs. Mud Typ,~ Mud Weight Viscosity P V Dispersed mud 9.5 #/gal 43 Sec. 13 YP Fluid Loss Solids 10 3.9 cc 8% Temo 94 OF Survey Deoth Angle Direction TV[;) N (+)IS (-) E(+)/W(-) Section Coordinate Coordinate DQg ,Leg o/100' Reviewed By: dh BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday. September 13. 1990 WELL: P-13 (32-31-11-13) APl No. 50-029-22080 Day: 1 6 Depth at 0600 Hrs. = 24 Hour Footage = 9,.500 Ft. .C_Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska, United Rig #2 125261 Current O0eratign' Running Liner. Summary of La, st 24 Hours: Logged open hole. Ran RFT and retrieved sidewall cores. Running in hole with 5-1/2" Liner. Mud Type Mud Weight Viscosity Dispersed mud 9.5 #/gal 40 Sec. ?V YP. Fluid Loss Solids 13 10 3.6 cc 9% Ternp 94 OF , Survey Depth Angle Direction .TVD N (+)/S (-) Ef.+)/W(-) Dog Leg Section Coordinate Coordinate ?/100'. Reviewed By: dh BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Friday. Seotember 14. 1990 WELL: P-13 (32-31-11-13) APl No. .50-029-22080 Day: 17 Depth at 0600 Hrs. = 24 Hour Footage = 9,500 Ft. OFt. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Ria #2 -- 125261 Current O.oeratign' Running in hole to clean liner Summ~,ry gf Last 24 Hours: Ran 5-1/2" liner to 9470'. Cemented liner and wait on cement. Cleaned cement from 8500 to 8790' inside 9-5/8" casing. MudTYDe Mud Weight Viscosity P V. YP EL~ Solids- Dispersed mud 9.5 #/gal 43 Sec. 13 10 3.6 cc 9% TemD 84 OF _N (+~/S (-) Ef+}/W(.~ Doa Lea Survey J~e,P. tJ]. Angle .g.J.Le.~,.t[Q~ TVD Section Coordinate Coordinate °/100' Reviewed By' dh BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Tuesday, November 20, 1990 WELL: P-13 (32-31-11-13) BAY UNIT RIG: ALASKA UNITED #2 Day: 20 Depth at 0600 Hrs. = 0 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22080 125261 $2,473,000 $2,132,09@ Current Operation: Loading 4-1/2" tubing to pipe shed. Summary of Last 24 Hours: Moved the dg from P-18 to P-13. Accepted rig at 0400 hours on 11/20/90. MudType Mud Weiqht Viscosity P V ,YP Fluid Loss Solids Temp #/gal Sec. cc °F Survey Depth Angle Direction N-S E-W D~g Leg TVD Section Coordinate Coordinate °/100' RECEIVED Alaska Oil & Gas Cons. Commission Anchorage Reviewed By: SS BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Wednesday, November 21, 1990 WELL: P-13 (32-31-11-13) BAY UNIT RIG: ALASKA UNITED #2 Day: 21 Depth at 0600 Hrs. = 9500 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22080 125261 $2,473,000 $2;167,514 Current Operation' Freeze protect tubing annulus with diesel. Summary of Last 24 Hours: Nippled down tree and nippled up BOP. Ran in hole with 4-1/2" tubing. Installed control line and nippled back up the tree. Pressure tested the tree to 5000 psi, ok. MudTyoe Mud Weight Viscosity_ p ¥ yp ~ Solids ~ Brine Cf/gal Sec. cc °F Survey Deoth Angle D.J.Ee,.6t[D.E TVD N-$ E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, November 26, 1990 WELL: P-13 (32-31-11-13) RIG: ALASKA UNITED #2 Day: 22 Depth at 0600 Hrs. = 9500 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22080 125261 $2,473,000 $2,203,388 Current Operation: Moving the rig from P-13 to P-17 Summary of Last 24 Hours: Set the 4-1/2" x 7-5/8" tubing packer with 3000 psi. Tested the tubing annulus to 2500 psi, ok. Released the rig @1200 hrs on 11/21/90. Mud Type Mud Weight Viscosity p V ,.YP. Fluid Lo.~s ,Solid.~Temp Brine #/gal Sec. cc °F N-S E-W J~ Survey Depth ,Angle. Direction TVD Section Coordinate Coordinate °/100' Reviewed By' dh · ' ' 5280 = : : : - . . .. .: . · . . · -, :.: :i:- · :: .-%? . . '-::::.::' i:';<~i:.: :-' WELL No. P-13 LAT. = 70'15'50.081" LONG. = /~I~8°56'13.862" 5,947,226.52 A.S.P. ~:s3~,455.~3 ZONE 4 '2171' FROM WEST UNE I hereby certify that ! om properly registered o~d licensed to practice land ~urveying In the State of Alaska, and that this plat represents a survey made by me or under my supervision, and that all .dimensions and other details ore-correct. Date 'SEPT.-t1,-i990: -:..LS No; ' . . . Registered Land Surveyor 49th Keith A. No. LS 7555 WELL PAD "P' PADP-I~ WELL No. P-13 ASBUILT LOCATED IN PROTRACTED SECTION 31, TOWNSHIP 11 NORTH, RANGE 13 EAST, UMIAT ME:REDIAN, ALASKA SURVEYED FOR: B.P. EXPLORA ON P.O. BOX '196612 ANCHORAGE:, ALASKA 99519-6612 :I~UR~YED BY: ARCTIC 'SLOPE CONSULTINO OROUP 6700 ARCTIC SPUR ROAD ANCHORAGE, ALASKA 99518 DRA~I BY: KMC DA~: 9/10/90 3O 31 ;31 30 31 2171' T11N T1 ON NO SCALE 31 PADP-1,3X WELL PAD "P" WELL No. P-15 ASBUILT LOCATED IN PROTRACTED SECTION 51, TOV~,iSHIP 11 NORTH, RANGE 15 EAST, UMIAT MEREDIAN, ALASKA SURVEYED FOR: B.P. EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 SURVEYED BY: ARCTIC SLOPE CONSULTING GROUP 6700 ARCTIC SPUR ROAD ANCHORAGE, ALASKA 99518 DRAWN BY: KMC I DATE: 9/12/90 ., -.. BP ALASKA EXPLORATION INC. SIDEWALL CORE DESCRI PTI ONS WELL : F'-~"~ LOCATION : ~)~)LA,, / ~( ~~. SHOT : ~ ~ RECOVERED : ~3 DATE : ~ - IZ-~O ~=~~ DESCRIBED BY : ~, L~i'> ~ C, , , '~ ~ ~V.,~-.. , [ ~i~ ~) ,. DEPTH REC LITHOLOGY ~ COB~ENTS HYDROCARBONS (~°°~) ~.'~c~ ~o ~1~ ~o Jo,.:..:' ~. ,,~ ~ qq03 - /t ~~' j ' . C~o~ (~So) ¢~, ~~ .~.~ ~ .-~ .... L ~ oC-~ ~.,g ~ ~,, ~ ~.: ~ ~ o._ ~.. o d~ 1[~1 ~: ~ -: ' F~- ~ ~.~. qss - ~ r~ ~, ~,,...u .... 9,,., . ~ .---'~ BP ALASKA EXPLORATION INC. SIDEWALL CORE DESCRIPTIONS WELL , ~-I3 LOCATION SHOT ~ ~ ~ RECOVERED ~ PATE DESCRIBED BY , DEPTH) REC. LITHOLOGY ~ COMMENTS HYDROCARBONS II ~ - (~0I/,~ 5s ~~ )o~- .~c,~.~ ~ ~.,~1. ~'~ ~) ~,.~ (q~) k~x ~s~4~ ~.g~,.at ~~a~ ~.~ ,~.~;~ v ~~,,,.~ , Co) qosfi E -- 9os5 ~ ~ -' . . BP ALASKA EXP INC. -/>~ ,,.,¢~t¢:, ! SIDEWALL CORE DESCRIPTIONSt~t~i~i/~,~' WELL : ~-~-' 1-'-'-~ LOCATION ' SHOT : .'~ Ja RECOVERED : ~ ~ DATE : DEPTH REC. LITHOLOGY ~ COMMENTS HYDROCARBONS , ZSoW 1,5" ~~, v~ ~,,.~f~ ~¢,~ ~o,;v ~.~B ~r~,~,~..~-s%~/~~,~r' ~q~O ! ~ ',"~¢'~. ~d 2~7~~/~,-',~-qr~. . ~, .~ c~, ~2° 'J''' -, ~-/3F j : q~o ~ ~ ' , I q?sg ~ ,, ~ ~Z.o ko J¢¢ 9..~ *'*¢rx::z~oC ~ ~ ~o~.~,3 ~'~//".','~3 ~ t u,.¢u-C ~7f3 } ~" ss-~,~-b~,a, u. f.- n,<~ ~,~. ~u s~.a.~.~,, o- r° ~: ,, %s ~zo~ .! o ~q., ~e,:~~.$~ ~.~,. s~,~5 ,I -, I ,'-"'"i Page ~ of ~ BP ALASKA EXPLORATION INC. SIDEWALL CORE DESCRIPTIONS WELL : ~ - (-~ LOCATION : ~---~ ('~ SHOT : '~1-~ RECOVERED : ,~(<~ -DATE : DESCRIBED BY : &~;~ / DEPTH REC. LITHOLOGY 6 COMMENTS HYDROCARBONS AIo~;~bl~ , ~ ~/ ~~~ ~& ~~tc ~7," ~z~,O~., J.~ bc~o~) ~:J-C:'~.:t ~'~1 ~u~.~,c-:-~c-(-b~n~ ~ ~ ~" ~orff~3 ~,u~'-.-.-.r~+_ c ~c.) .gr: ~ e; 10.90c5v ~ ~~5 ~ 590 ~ ~¢~ -c~, o c " -. [ TELECOI September 18, 1990 JOB #777 BP EXPLORATION (ALASKA) INC. WELL: HURL STATE #P-13 AUDI #2 ORIGINAL Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Jonathan G. Mapes Field Operations Supervisor JGM/el Enclosures RECEIVED TELECO OILFIELD SERVICES SURVEY CALCULATIONS D~te 09/10/90 Company: BP Exploration Well: P-13 Location: Hurl State Rig: AUDI 2 TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 777TAK 0.0 30.0 30.0 13.9 MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates' Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' Tie in to magnetic single shots 490 0 0.8 235.0 489.99 -2.42 1.84S 2.63W 3.21 S 55.02W 0.00 990 500 0.5 5.0 989.98 -2.73 1.54S 5.12W 5.35 S 73.23W 0.23 1490 500 0.5 35.0 1489.96 1.46 2.42N 3.68W 4.40 N 56.69W 0.05 1988 498 0.0 0.0 1987.95 3.53 4.24N 2.43W 4.89 N 29.83W 0.10 2490 502 1.0 160.0 2489.93 -0.10 0.13N 0.92W 0.93 N 82.19W 0.20 PAGE 1 Company: BP Exploration, Well: P-13, Location: Hurl State, Riq: AUDI 2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/1006 ******************************************************************************************************* 2962 472 0.8 295.0 2961.90 -2.96 3432 470 0.8. 260.0 3431.86 -3.61 2.48S 2.30W 3.38 S 42.83W 0.35 1.71S 8.11W 8.29 S 78.10W 0.10 3902 470 0.5 185.0 3901.84 -6.88 4.29S 11.32W 12.11 S 69.26W 0.17 4379 477 0.5 185.0 4378.82 -11.00 8.43S 11.69W 14.41 S 54.18W 0.00 Teleco MWD surveys 4749 370 1.1 97.9 4748.79 -12.22 10.53S 8.31W 13.41 S 38.27W 0.32 5126 377 0.6 82.7 5125.75 -11.13 10.78S 2.77W 11.13 S 14.40W 0.14 5510 384 0.4 322.1 5509.74 -9.57 9.46S 1.60W 9.60 S 9.57W 0.23 5779 269 0.4 305.3 5778.74 -8.65 8.18S 2.94W 8.69 S 19.76W 0.04 6154 375 0.8 270.8 6153.72 -8.76 7.39S 6.62W 9.92 S 41.89W 0.14 6555 401 1.1 306.0 6554.67 -7.95 5.08S 12.54W 13.53 S 67.92W 0.16 6605 50 1.9 339.4 6604.65 -7.09 4.03S 13.22W 13.82 S 73.06W 2.31 6699 94 5.4 0.8 6698.45 -1.49 1.86N 13.70W 13.83 N 82.29W 3.93 6793 94 7.6 1.9 6791.84 8.90 12.49N 13.44W 18.35 N 47.08W 2.34 6887 94 9.9 8.6 6884.74 23.02 26.70N 12.02W 29.28 N 24.24W 2.67 PAGE 2 CompanY: BP Exploration, Well: P-13, Location: Hurl State, Riq: AUDI 2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/1006 6981 94 12.2 6.8 6976.99 40.93 44.55N 9.64W 45.58 N 12.21W 2.47 7070 . 89 14.5 4.7 7063.58 61..26 65.00N 7.61W 65.44 . N 6.68W 2.64 7168 98 15.7 5.0 7158.19 86.47 90.43N 5.45W 90.60 N 3.45W 1.23 7262 94 15.7 4.3 7248.69 111.58 115.79N 3.38W 115.84 N 1.67W 0.20 7354 92 15.6 4.3 7337.28 136.05 140.53N 1.52W 140.54 N 0.62W 0.11 7464 110 17.7 10.7 7442.67 167.33 171.72N 2.69E 171.74 N 0.90E 2.53 7555 91 19.4 12.1 7528.94 196.25 200.09N 8.43E 200.27 N 2.41E 1.93 7649 94 20.7 13.1 7617.24 228.47 231.54N 15.47E 232.06 'N 3.82E 1.43 7743 94 21.8 14.2 7704.85 262.54 264.64N 23.52E 265.69 N 5.08E 1.24 7836 93 23.0 15.6 7790.83 297.97 298.89N 32.64E 300.67 N 6.23E 1.42 7930 94 24.2 18.8 7876.96 335.54 334.83N 43.79E 337.68 N 7.45E 1.86 8018 88 25.5 20.2 7956.81 372.34 369.68N 56.14E 373.92 N 8.64E 1.62 8110 92 27.1 19.1 8039.29 412.90 408.07N 69.84E 414.01 N 9.71E 1.82 PAGE 3 Company: BP Exploration, Well: P-13, Location: Hurl State, Riq: AUDI 2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/1006 ******************************************************************************************************* 8203 93 27.4 17.7 8121.97 455.34 448.48N 83.28E 456.14 N 10.52E 0.76 8295 92 27.9 17.0 8203.46 497.96 489.23N 96.01E 498.56 N ll.10E 0.65 8389 94 27.1 19.5 8286.84 541.23 530.44N 109.59E 541.65 N 11.67E 1.49 8483 94 29.3 20.5 8369.68 585.40 572.17N 124.80E 585.63 N 12.30E 2.39 8561 78 31.5 21.2 8436.95 624.57 609.05N 138.85E 624.68 N 12.84E 2.86 8671 110 33.3 17.7 8529.83 683.22 664.62N 158.43E 683.25 N 13.41E 2.36 8762 91 33.4 19.8 8605.85 733.06 711.99N 174.51E 733.06 N 13.77E 1.27 8856 94 33.1 21.6 8684.46 784.23 760.20N 192.72E 784.25 N 14.23E 1.10 8950 94 33.0 22.3 8763.25 835.00 807.75N 211.88E 835.08 N 14.70E 0.42 8982 32 32.9 22.3 8790.10 852.22 823.86N 218.49E 852.34 N 14.85E 0.33 PAGE 4 -1000 TE_ CO Oilf eld Services VERTICAL PROJECTION 1000 2000 3000 4000 5000 1000 2000 '-~3000 4000 >5000 6000 7000 BO00 9O00 490 ' .75 aeg 990 ' .5 oleg 1490 ' .5 deg 1988 ' .01 deg BP Exploration P-13 Hurl State AUDI 2 JOB# 777TAK/O0 SCALE: 1 inch = lO00 feet 2490 ' 1.0'] deg 2962 ' .75 deg 3432 ' .75 deg ,_~t 3902 ' . ~ deg .2 4379 ' .5 deg 4749 ' 1.1 deg 5~26 ' .6 deg 5510 ' .4 deg 5779 ' .4 deg 6154 ' .8 deg 6555 · 1.1 deg 886793 ' 7.6 deg 7070 ' i4.5 deg 7354 ' 15.6 deg 649 ' 20.7 deg 7930 " 24.2 deg 8203 ' 27,4 deg 483 ' 29.3 deg VERTICAL SECTION (ft) T~_~r:CO O~ 1 PLAN Services 1600 + +/ 8982 ' j 8856 ' ~82 ' / 8483 ' ' 2 8389 ' 17/8295 ' 8203 ' ~3o ' ' 7354 ' 7168 ' BP Exploration P-13 Hurl State AUDI 2 JOB# 777TAK/O0 SCALE' ~ inch = 200 feet 1400 1200 !000 800 500 4OO 2OO 20O Z © 200 0 2OO 40~ft) EAST 6OO 800 1000 GREAT LAND DIRECTIONAL DRILLING, INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY BP EXPLORATION COMPANY ORIGINAL WELL NAME PRUDHOE BAY LOCATION AL890D27 MWD 9/10/90 JOB NUMBER TYPE SURVEY DATE L. HENSLEY SUPERVISOR NAME T I TLE S I GNATURE 490 FT. 9040 FT. DEPTH INTERVAL FROM TO 8127190 9108/90 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE,'ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. - t991 I ~r~] ..., l t'",, Oate I ~/_.c,t"'l_/.~O_~.~ _ Alaska Oil & Gas Cons..CommlssiOn Anchorage GREAT LAND Client .... : Field ..... : Well ...... : Section at: Engineer..: S MEAS C DEPTH 3 490 3 990 3 1490 3 1988 3 2490 3 2962 0 3 3432 0 3 3902 0 3 4379 0 3 4749 1 3 5126 0 3 5510 0 3 5779 0 3 6154 0 3 6555 1 3 6605 1 3 6699 5 3 6793 7 3 6887 9 3 6981 12 3 7070 14 DIRECTIONAL DRILLING, BP EXPLORATION PRUDHOE BAY P-13 N,13.90,E L. HENSLEY INCLN ANGLE VERTICAL-DEPTHS BKB SUB-SEA .75 490.0 398.2 .50 990.0 898.1 .50 1489.9 1398.1 .00 1987.9 1896.1 .00 2489.9 2398.1 .75 2961.8 2870.0 .75 3431.8 3340.0 .50 3901.8 3810.0 .50 4378.8 4286.9 .10 4748.7 4656.9 .60 5125.7 5033.9 .40 5509.7 5417.8 .'40 5778.7 5686.8 .80 6153.6 6061.8 .10 6554.6 6462.8 .90 6604.6 6512.7 .40 6698.4 6606.5 .60 6791.8 6699.9 .90 6884.7 6792.8 .20 6976.9 6885.1 .50 7063.5 6971.7 INC. SECTION DISTNCE RECORD OF SURVEY DIRECTION BEARING 0.6 S 55.00 W 1.8 N 5.00 E 6.1 N 35.00 E' 8.2 N 0.00 W 9.5 S 20.00 E 4.8 N 65.00 W 4.1 S 80.00 W -0.1 S 5.00 W -4.2 S 5.00 W -7.0 S 82.10 E -5.7 -3.0 -2.1 -1.8 -1.3 09/10/90 -0.5 5.0 15.4 29.5 47.4 Computation...: RADIUS OF CURVATURE Survey Date...: 09/10/90 RKB Elevation.:. 91.83 ft Reference ..... : AL890D28 Magnetic Dcln.: 30.00 E 67 ..7 N 82.70 E N 37.90 W N 54.70 W N 89.30 W N 54.00 W N 20.60 W N 0.80 E N 1.90 E N 8.60 E N 6.80 E N 4.70 E RELATIVE-COORDINATES FROM-WELL-HEAD 1.2N 2.3W 3.4N 6.1W 7.4N 4.6.W 9.5N 4.0W 10.0N 0.9W 6.2N 5.1W 7.0N ll.iW 3.5N 14.3W 0.7S 14.7W 4.3S ll.SW 4.4S 6.2W 1.8S 5.1W 0.5S 6.5W 0.7N 10.2W 2.7N 16.4W 3.8 N 17.2 W 9.6 N 18.2 W 20.3 N 17.9 W 34.5 N 16.6 W 52.3 N 14.2 W 72.8N 12.1W CLOSURE DL DISTNCE BEARING /100 2.6 N 62.50 W 0.15 7.0 N 60.94 W 0.05 8.7 N 31.80 W 0.00 10.3 N 22.72 W 0.10 10.1 N 5.28 W 0.20 8.0 N 39.43 W 0.05 13.1 N 57.81 W 0.00 14 . 7 N 76 . 38 W 0 . 05 14.7 S 87.36 W 0.00 12.5 S 69.75 W 0.16 7.6 S 54.77 W 0.13 5.4 S 70.56 W 0.05 6.5 S 85.42 W 0.00 10.2 N 86.20 W 0.11 16.6 N 80.51 W 0.07 17.6 N 77.63 W 1.60 20.6 N 62.11 W 3.73 27.1 N 41.51 W 2.34 38.3 N 25.73 W 2.46 54.2 N 15.19 W 2.45 73.8 N 9.48 W 2.59 ~Survey Codes: 3/MWD P-13 S MEAS INCLN C DEPTH ANGLE 3 7168 15.70 3 7262 15.70 3 7354 15.60 3 7464 17.70 3 7555 19.40 3 7649 20.70 3 7743 21.80 3 7836 23.00 3 7930 24.20 3 8018 25.50 3 8110 27.10 3 8203 27.40 3 8295 27.90 3 8389 27.10 3 8483 29.30 3 8561 31.50 3 8671 33.30 3 8762 33.40 3 8856 33.10 3 8950 33.00 3 9040 32.90 VERTICAL-DEPTHS BKB SUB'SEA SECTION DISTNCE 7158.1 7066.3 92.9 7248.6 7156.8 118.1 7337.2 7245.4 142.5 7442.6 7350.7 173.8 75Z8.8 7437.0 202.7 7617.1 7525.3 235.0 7704.7 7612.9 269.0 7790.7 7698.9 304.5 7876.9 7785.0 342.0 7956.7 7864.9 378.8 8039.2 7947.4 419.4 8121.9 8030.0 461.8 8203.4 8111.5 504.5 8286.7 8194.9 547.7 8369.6 8277.7 591.9 8436.8 8345.0 631.1 8529.7 8437.9 689.7 8605.7 8513.9 739.6 8684.3 8592,5 790.7 8763.1 8671.3 841.5 RECORD OF SURVEY 8838.7 8746.8 889.9 DIRECTION BEARING N 5.00 E N 4.30 E N 4.30 E N 10.70 E N 12.10 E N 13.10 E N 14.20 E N 15.60 E N 18.80 E N 20.20 E N 19.10 E N 17.70 E N 17.00 E N 19.50 E N 20.50 E RELATIVE-COORDINATES FROM-WELL-HEAD 98.2 N 10.0 W 123.6 N 7.9 W 148.3 N 6.1 W 179.6 N 2.0 W 207.9 N 3.8 E 239.4 N 10.8 E 272.5 N 18.8 E 306.7 N 27.9 E 342.7 N 39.1 E 377.5 N 51.4 E 415.9 N 65.1 E 456.3 N 78.6 E 497.1 N 91.3 E 538.3 N 104.9 E 580.0 N 120,1 E N 21.20 E 616.9 N 134.1 E N 17.70 E 672.5 N 153.7 E N 19.80 E 719.9 N 169.8 E N 21.60 E 768.1 N 188.0 E N 22.30 E 815.6 N 207.2 E N 22.30 E 860.9 N 225.8 E Page 2 09/10/90 CLOSURE DISTNCE BEARING 98.7 N 5.81 W 123.8 N 3.67 W 148.4 N 2.34 W 179.6 N 0.62 W 208.0 N 1.04 E 239.6 N 2.58 E 273.1 N 3.95 E 308.0 N 5.21 E 344.9 N 6.50 E 381.0 N 7.76 E 421.0 N 8.90 E 463.0 N 9.77 E 505.4 N 10.41 E 548.4 N 11.03 E 592.3 N 11.70 E 631.3 N 12.27 E 689.8 N 12.88 E 739 .'6 N 13.27 E 790.7 N 13.76 E 841.5 N 14.25 E DL /lOO 1.22 0.05 0.11 1.98 1.88 1.39 1.18 '1.31 1.40 1.51 1.76 0.45 0.57 1.01 2.35 2.83 1.90 0.71 0.65 0.25 890.0 N 14.70 E 0.11 'Survey Codes: 3/MWD P-13 Page 3 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL 09/10/90 SUBSEA MEAS INCLN DEPTH DEPTH ANGLE TVD BKB 400 492 0.75 492 500 592 0.70 592 600 692 0.65 692 700 792 0.60 792 800 892 0.55 892 900 992 0.50 992 1000 1092 0.50 1092 1100 1192 0.50 1192 1200 1292 0.50 1292 1300 1392 0.50 1392 1400 1492 0.50 1492 1500 1592 0.40 1592 1600 1692 0.30 1692 1700 1792 0.20 1792 1800 1892 0.10 1892 1900 1992 0.01 i992 2000 2092 0.21 2092 2100 2192 0.41 2192 2200 2292 0.61 2292 2300 2392 0.80 2392 2400 2492 1.00 2492 2500 2592 0.95 2592 2600 2692 0.89 2692 2700 2792 0.84 2792 2800 2892 0,79 2892 MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 0 0 S 55.48 W 1~.19 N 2.33 W 0 0 S 81.48 W 0.73 N 3.50 W 0 0 N 72.52 W 0.84 N 4.66 W 0 0 N 46.52 W 1.45 N 5.59 W 0 0 N 20.51 W 2.38 N 6.09 W 0 0 N 5.11 E 3.40 N 6.09 W 0 0 N 11.11 E 4.26 N 5.96 W 0 0 N 17.11 E 5.11 N 5.75 W 0 0 N 23.11 E 5.93 N 5.45 W 0 0 N 29.11 E 6.71 N 5.07 W 0 0 N 34.87 E 7.45 N 4.60 W 0 0 N 27.84 E 8.12 N 4.20 W 0 0 N 20 . 81 E 8 . 67 N 3.96 W 0 0 N 13.78 E 9.10 N 3.86 W 0 0 N 6.75 E 9.37 N 3.87 W 0 0 S 20.00 E 9.48 N 3.97 W 0 0 S 20.00 E 9.50 N 3.84 W 0 0 S 20.00 E 9.56 N 3.47 W 0 0 S 20.00 E 9.67 N 2.85 W 0 0 S 20.00 E 9.82 N 2.00 W 0 0 S 19.45 E 9.98 N 0.91 W 0 0 S 9.16 W 8.31 N 0.76 W 0 0 S 37.76 W 6.85 N 1.42 W 0 0 S 66.37 W 5.97 N 2.66 W 0 0 N 85.03 W 5.83 N 4,13 W 2900 2992 0.75 2992 0 0 N 67.23 W 6.35 N 5.45 W P-13 SUBSEA DEPTH 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 50OO 5100 5200 5300 5400 55OO MEAS DEPTH 3092 3192 3292 3392 3492 3592 3692 3792 3892 3992 4092 4192 4292 4392 4492 4592 4692 4792 4892 4992 5092 5192 5292 5392 5492 5592 DATA INTERPOLATED FOR 100 INCLN TVD MD-TVD VERT ANGLE BKB DIFF CRRT 0.75 3092 0 0.75 3192 0 0.75 3292 0 0.75 3392 0 0.72 3492 0 0.66 3592 0 0.61 3692 0 0.56 3792 0 0.51 3892 0 0.50 3992 0 0.50 4092 0 0.50 4192 0 0.50 4292 0 0.52 4392 0 0.68 4492 0 0.85 4592 0 1.01 4692 0 1.04 4792 0 0.91 4892 0 0.78 4992 0 0.64 5092 0 0.57 5192 0 0.51 5292 0 0.46 5392 0 0.41 5492 0 0.40 5592 0 Page FT SUBSEA INTERVAL 4 09/10/90 DIRECTION BEARING 0 N 74.68 W 0 N 82.13 W 0 N 89.58 W 0 S 82.98 W 0 S 70.42 W 0 S 54.46 W 0 S 38.50 W 0 S 22.55 W 0 S 6.59 W 0 S 5.00 W 0 S 5.00 W 0 S 5,.00 W 0 S 5.00 W 0 S 1.92 W 0 S 21.62 E 0 S 45.16 E 0 S 68.70 E 0 N 42.67 W 0 N 48.80 E 0 S 39.73 E 0 S 51.74 W 0 N 61.92 E 0 N 30.52 E 0 N 0.89 W 0 N 32.30 W 0 N 43.03 W RELATIVE COORDINATES FROM WELL HEAD 6.78 N 6.69 W 7.04 N 7.97 W 7.14 N 9.27 W, 7.06 N 10.58 W 6.79 N 11.84 W 6.23 N 12.90 W 5.44'N 13.70 W 4.52 N 14.17 W 3.56 N 14.32 W 2.69 N 14.39 W 1.82 N 14.46 W 0.95 N 14.54 W 0.08 N 14.62 W 0.79 S 14.69 W 1.82 S 14.51 'W 2.95 S 13.85 W 3.94 S 12.65 W 3.79 S 11.48 W 3.64 S 9.43 W 6.23 S 8.36 W 8.31 S 10.69 W 4.17 S 5.55 W 3.51 S 4.89 W 2.67 S 4.71 W 1.92 S 5.03 W 1.38 S 5.51 W P-13 Page 5 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL 09/10/90 SUBSEA MEAS INCLN DEPTH DEPTH ANGLE 5600 5692 0.40 5700 5792 0.41 5800 5892 0.52 5900 5992 0.63 6000 6092 0.73 TVD BKB 5692 5792 5892 5992 6092 6100 6192 0.83 6192 6200 6292 0.90 6292 6300 6392 0.98 6392 6400 6492 1.05 6492 6500 6592 1.70 6592 6600 6692 5.16 6692 6700 6793 7.60 6792 6800 6894 10.08 6892 6900 6996 12.59 6992 7000 7099 14.86 7092 7100 7203 15.70 7192 7200 7307 15.65 7292 7300 7411 16.69 7392 7400 7516 18.67 7492 7500 7622 20.33 7592 7600 7729 21.64 7692 7700 7837 23.02 7792 7800 7946 24.44 7892 7900 8057 26.18 7992 8000 8169 27.29 8092 8100 8282 27.83 8192 MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 0 0 N 49.28 W - 0.89 S 6.01 W 0 0 N 55.92 W 0.47 S 6.56 W 0 0 N 65.14 W 0.06 S 7.27 W 0 0 N 74.37 W 0.30 N 8.20 W 0 0 N 83.60 W 0.57 N 9.35 W 0 0 N 85.94 W 0.70 N 10.71 W 0 0 N 77.13 W 0.92 N 12.20 W 0 0 N 68.33 W 1.39 N 13.77 W 0 0 ' N 59.53 W 2.13 N 15.37 W 0 0 N 29.11 W 3.41 N 16.97 W 1 0 N 0.69 W 9.02 N 18.15 W 1 1 N 1.91 E 20.27 N 17.93 W 2 1 N 8 . 46 E 35.74 N 16 . 43 W 4 2 N 6.44 E 55.60 N 13.83 W 7 3 N 4.79 E 80.18 'N 11.54 W 11 4 N 4.74 E 107.67 N 9.19 W 15 4 N 4.30 E 135.67 N 7.02 W 19 4 N 7.61 E 164.05 N 4.43 W 24 5 N 11.50 E 195.43 N 1.16 E 30 6 N 12,81 E 230.15 N 8.67 E 37 7 N 14.04 E 267.50 N 17.58 E 45 8 N 15.64 E 307.18 N 28.07 E 55 9 N 19.06 E 349.08 N 41.27 E 65 11 N 19.73 E 393.52 N 57.22 E 77 12 N 18.21 E 441.55 N 73.78 E 90 13 N 17.10 E 491.25 N 89.51 E P-13 Page 6 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL 09/10/90 SUBSEA MEAS INCLN DEPTH DEPTH ANGLE TVD BKB 8200 8395 27.23 8292 8300 8509 30.02 8392 8400 8626 32.56 8492 8500 8745 33.38 8592 8600 8865 33.09 8692 MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 103 13 N 19.56 E 540.76 N 105.76 E 117 14 N 20.73 E 591.90 N 124.54 E 134 17 N 19.14 E 649.20 N 145.99 E 154 19 N 19.42 E 711.22 N 166.75 E 173 20 N 21.67 E 772.60 N 189.84 E 8700 8984 32.96 8792 192 19 N 22.30 E 832.84 N 214.27 E P-13 Page 7 DATA INTERPOLATED FOR 1000 FT MEASURED DEPTH INTERVAL 09/10/90 MEAS INCLN VERT-DEPTHS SECT DIRECTION REL-COORDINATES DEPTH ANGLE BKB SUB-S DIST BEARING CLOSURE FROM-WELLHEAD DIST BEARING 1000 0.50 1000 908 2 N 5.60 E 3 N ,. 6 W 2000 0.02 2000 1908 8 S 20.00 E 9 N 4 W '3000 0.75 3000 2908 5 N 67.83 W 6 N 6 W 4000 0.50. 4000 3908 -1 S 5.00 W 3 N 14 W 5000 0.77 5000 4908 -8 S 32.54 E 6 S 8 W DL/ 100 '7 N 60.28 W 0.0 ' 10 N 22.72 W, 0.2 8 N 40.95 W 0.0 15 N 79.70 W 0.0 11 S 52.45 W 0.1 6000 0.64 6000 5908 7000 12.69 6995 6904 8000 25.23 7940 7849 9000 32.94 8805 8713 -2 N 75.09 W 51 N 6.35 E 371 N 19.91 E 868 N 22.30 E 0 N 56 N 370 N 841 N 8 W 8 N 87.76 W 0.1 14 W 58 N 13.69 W 2.6 49 E 373 N 7.50 E 1.5 218 E ,868 N 14.51 E 0.1 <KB>O 500 t000 i500 2000 2500 3000 3500 4000 4500 5000 5500 8000 8500 7000 7500 8000 8500 VEBTIC/~L SECTION VIEW i Section at: N 13.90 E · TVD Scale · 1 inch = 1000 feet ~ Oep Scale.' 1 inch = 1000 feet , Oraun · O§/~O/gQ ~arker Identification ~ T~D SECTN A] K8 0 0 0 B) 1'13 9040 8839 890 · 9000 500 IND. N 0.00 32.90 0 500 ~i000 i500 2000 2500 3000 3500 4000 4500 5000 Section Departure 84O 770 700 630 560 49O 420 350 280 2t0 i40 70 0 70 Harker Identification MO N/S A] K8 0 0 N 0 E 8) TD 9040 88! N 226 PLAN VIEN BP EXPLORATION P-13 ' CLOSURE ..... : 890 ft N 14.70 E OECLINATION.: 30.00 E SCALE ....... : ! inch = 140 feet ORANN ....... : 09/10/90 1 i / ! I 1 / ! ! ! I / ! t ! ! t J / 1 / / / / / / / 70 0 70 i40 2i0 280 350 420 490 560 630 700 770 <- NEST · EAST -> I I I I I I I III II II II I ORIGINAL SUB - S URFA CE DIRECTIONAL SURVEY r~ UIDANCE ONTINUOUS ~-~ OOL RE~EIYED FEB - ,5 t99t Nasi~a Oil & Gas Cons. Commission 'Anchorage Company BP EXPLORATION i i i i i i !1 i IL · I II Well Name P-13(.32.-31-.,11-13.)(.(.(.(2496,.' N.SL.2171', ,EW.L.S,E,C ,,.31.Tll.N..R13E) Field/Location PRUDHOE BAY. NORTH SLOPE. ALASKA Il I I · II I I I Job Reference No. 74091 Loqqed WEST I II I I II I I I / I I I Date 20-Sep-90 Computed By: KOHRING I II GCT OIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATIgN PRUDHOE 5AY NaUTcH SLOPE, ALASKA SURVEY DATE: 20-SEP-1990 ENSINEER: WEST METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 15 DES ~5 MIN lAST COMPUTATION DATE: 5-0CT-90 P A 'J E 1 ' BP EXPLORATION P-13 C32-31-11-133 PRUDHOE BAY NORTH SLOPEm ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN KELLY CUSHING ELEVATION: 91.83 FT ENGINEER: WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST,. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 -91.83 ~ 0 N 0 0 E 0.00 0.00 0.00 N 0.00 E 100.00 100.00 8.17 2 N 40 53 E 0.07 0.03 0.08 N 0.02 W ZO0.O0 200.00 108.17 0 13 S 35 ,3 W -0.12 0.00 0.10 $ 0.11 W 300.00 30'0.00 Z08.17 0 17 S 46 6 W -0.54 0.23 0.44 S 0.44 W 400.00 400.00 308.17 0 12 S 61 31 W -0.85 0.00 0.68 S 0.72 W 500.00 500.00 408.17 0 14 S 52 4 W -1.07 0.00 O.$Z S 1.03 W 600.00 600.00 508.17 0 I S 10 12 W -1.28 0.00 1.01 S 1.15 W 700.00 700.00 608.17 0 6 N TO 41 W -1.24 0.08 0.95 S 1.13 W 800.00 800.00 708.17 0 8 S 47 20 W -1.36 0.00 1.02 S 1.38 W 900.00 900.00 908.17 0 5 N 75 14 E -1.44 0.00 1.10 S 1.38 W 1000.08 1000.00 908.17 1100.0 1100.00 1008.17 1200o00 1200.00 1108.17 1300.00 1299.99 1208o16 1400.00 1399.99 1308.16 1500.00 1499.99 1408.16 1600.00 1599.99 1508.16 1700.00 1699.99 1608.16 1800.00 1799.99 1708.16 1900.00 1899.99 1~08.16 ZO00.O0 1999.99 1908.16 2100.00 2099.99 2008.16 2200.00 2199.99 2108.16 2300.00 2299.9~ 2205.15 2400.00 2399.98 2308.15 2500.00 2499.98 2408.15 Z600.O0 Z599.97 2508.14 2700.00 2699.97 2608.14 2800.00 2799.97 2708.14 ""- 2900.00 2899.97 2808.14 0 7 N lA. 12 W -1.,29 0.00 0.98 S 1.30 W 0 9 N 65 34 W -1.Z0 0.00 0.83 S 1.46 W 0 10 N 62 I W -1.18 0.14 0.74 S 1.70 W 0 24 N 44 19 W -0.94 0.11 0.38 S 2.12 W 0 14 N 45 59 W -0.68 0.00 0.01 S 2.47 W 0 5 N 42 39 W -0.54 0.00 0.19 N 2.56 W 0 6 N 8 54 W -0.44 0.63 0.31 N 2.72 W 0 13 N 59 20 W -0.35 0.12 0.48 N 2.99 W 0 13 N 56 3 0 W -- 0 . r2~ 0 . 0 0 0.69 N 3.31 W 0 7 N 77 44 W -0.17 0.67 0.84 N 3.62 W 0 ,6 N 82 4 c -0.18 0.32 0.81 N 3.54 W 0 24 S 32 Z ~ -0.25 0.9'5 0.77 N 3.65 W 0 30 S 26 22 W -1.10 0.36 0.00 N 4.05 W 0 38 S Z1 55 W -2.07 0.66 0.91 S 4.42 W 0 25 S 10 42 W -3.01 0.40 1.80 S 4.71W 0 28 S I 5 E -3.73 0.35 2.54 S 4.74 W 0 23 S 21 28 E -4.51 0.39 3.36 S 4.67 W 0 17 S 38 27 E -4.89 0.0,8 3.85 S 4.37 W 0 16 S 39 12 E -5.15 0.75 4.21 S 4.05 W 0 11 S 36 9 E -5.38 0.00 4.52 S 3.79 W 0 22 S 39 17 E -5.71 0.09 4.94 S 3.52 W 0 14 S 13 17 E -6.03 0.00 5.32 S 3.32 W 0 17 S 4 39 'W -6.46 0.12 5.78 S 3.30 W 0 28 S 10 5 W -7.10 0.19 6.42 S 3.42 W 0 42 S 18 4{3 W -8.14 0.35 7.42 S 3.71 W 0 48 S 26 2') W -9.43 0.25 8.61 S 4.22 W 0 36 S 26 14 W -10.55 0.53 9.63 S 4.73 W 0 40 S 2_3 35 W -11.65 0.01 10.64' S 5.22 W 0 35 S 22 6 W -12.77 0.29 11.67 S 5.66 W 0 26 S 10 41 W -13.64 0.47 12.51 S 5.89 W 3000.00 2999.97 2908.14 3100.00 3099.97 3008.14 3200.00 3199.96 3108.13 3300.00 3299.96 3208.13 3400.00 3399.96 3308.13 3500.00 3499.95 3408.12 3600.00 3599.94 3508.11 3700.00 3699.94 3608.11 3800.00 3799.93 3708.10 3900.00 3899.93 3808.10 D,~TE OF SURVEY: 20-SEP-199.0 0.00 N ,0 0 E 0.08 N 16 Z7 W 0.15 S 48 ,~2 W 0.62 S ~44 q, 3 " 0.99 S 46 38 1.31 S 51 36 ~, 1.53 S 48 ,42 W 1.52 S 51 12 W 1.71 S 53 21 W 1.77 S 51 27 W 1.63 S 53 10 W 1.68 S 60 19 W 1.86 S 66 30 W 2.16 S 7'9 55 W 2.47 S 89 49 W 2.66 N 85 55 W 2.73 N 83 31 W 3.03 N 80 58 W 3.38 N 7,8 15 W 3.72 N 76 56 W 3.64 N 77 8 W 3.73 N 78 4 W 4.05 N 89 59 W 4.51 S 78 24 W 5.04 S 69 3 t 5.37 S 61 47 I,, ,' 5.76 S 54 14 W 5.82 S 48 38 W 5.84 S 43 56 W 5.90 S 40 0 W 6.06 S 35 28 W 6.28 S 31 58 W 6.66 S 29 43 W 7.27 S 29 2 W 8.29 S 26 33 W 9.5':) S 26 6 W 10.73 S 26 10 W 11.85 S 26 T W 12.97 S 25 54 W 13.83 S 25 13 w COMPUTATION DATE: 5-OCT-gO PASE 2. ' BP EXPLORATION P-13 C32-31-11-13) PRUDHOE B~Y NORTH SLOPE, ALASKA DATE OF SURVEY: 20-SEP-1990 KELLY BUSHING ELEVATION: 91.83 FT ENGINEER: WEST INTERPOLATED VALUES FOR EVEN 100 FEET O~ MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 4000.00 3999.92 3908.09 4100.00 4099.92 4008.09 4200.00 ¢199.91 4108.08 4300.00 4299.90 4208.07 4400.00 4399.89 4308.06 4500.00 4499.89 4408.06 4600.00 4599.8'9 4508.06 4700.00 4699.87 4608.04 4800.00 ,4799.85 4708.02 4900.00 4899.84 4808.01 0 2'3 S I 27 W 0 3.5 S 3 29 E 045 S ~ 35 W 0 ~5 S 621E 033 S 8 28 E 0 31 $ 24 59 E 0 37 S 61 32 E I,, 7 S 73 34 E I 6 S 8243 E 053 N 83 2 E 5000.00 4999.83 4908.00 5100.00 5099.82 5007.99 5200.00 5199.82 5107.99 5300.00 5299.82 5207.99 5400.00 5399.81 5307.98 5500.00 5499.82 5407.99 5600.00 5599.81 5507.98 5700o00 5699.81 5607.98 5800.00 5799.81 5707.98 5900.00 5899.8t 5807.98 0 43 N 80 57 !E 0 32 N 78 19 E 0 23 N 72 40 E 0 24 N 65 43 E 0 16 N 47 15 E 0 13 N 8 12 W 025 N 5 1Z W 0 26 N 11 29 W 0 12 N 42 ZZ W 0 26 N 76 41 W 6000.00 5999.80 5907.97 6100.00 6099.80 6007.97 6200.00 6199.79 6107.96 6300.00 6299.78 6207.95 6400.00 6399.78 6307.95 6500.00 6499.77 6407.94 6600.00 6599.75 6507.92 6700.00 6699.58 6607.75 038 S 84 8 W 0 45 S 76 42 W 0 34 S 84 48 W 0 &O N ,~9 12 W 0 38 N 74 13 W 0 52 N 67 47 W I 16 N 38 50 W 5 6 N 0 33 W N 3 33 E N 8 45 E 6800.00 6798.96 6707.13 7 36 "~ 6900.00 6897.72 6805.89 10 8 7000.00 6995.77 6903.94 12 44 7100.00 7092.86 7001.03 14 44 7200.00 7189.29 7097.46 15 45 7300.00 7285.56 7193.73 15 30 7400.00 7381.77 7289.94 16 35 7500.00 7477.13 7385.30 18 23 7600.00 7571.49 7479.66 20 11 7700.00 7664.97 7573.14 21 21 7800.00 7757.70 7665.~7 22 38 7900.00 7849.58 7757.75 23 51 N 5 58 : N 5 5B c. N 3 37 E N 7 33 ~ N 10 2¢ E N 12 38 E N 14 6 E N 1.5 27 6 N 17 46 VERTICAL DOGLEG RECTANGULAR COORDINATES HOR'IZ. D:EPARTURE SECTION SEVERI'TY NORTH/SOUTH E~ST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN -14.33 0.31 13.20 S 5.96 W -15.13 0.64 14.04 S 5.93 W -16.53 0.68 15.48 S 5.98 W -17.76 0.03 16.79 $ 5.90 W -18.85 0.28 17.96 S 5.77 W -19.63 0.3:Z 18.82 S 5.58 W -20.11 0.67 19.47 S 5.04 W -20.31 0.11 20.12 S 3.50 W -20.18 0.86 20.52 S 1.56 W -19.67 O.OO 20.48 S 0.12 E -19.10 0.37 20.27 S 1.51 -18.61 0.23 20.07 S 2.60 -10.24 0-00 19.91 S 3.42 -1'7.88 0.74 19.70 S 4.01 -17,,43 0.46 19.38 S 4.51 -17.11 O.OO 19.09 S 4.6½ -16.63 0.05 18.58 S 4.61 -15.96 0.00 17.85 S 4.49 -15.37 0.66 17.19 S 4.30 -15.34 0.22 17.04. S 3.91 -15.59 0.23 17.04 S 2.98 E -16.12 0.28 17.26 S 1.82 E -16.66 0.17 17.49 S 0.64 E -17.01 0.16 17.55 S 0.47 W -17.20 0.3~ 17.42 S 1.60 W -17.13 0.05 17.02 S 2.78 W -16.64 2.12 16.09 S 4.24 W -11.74 3.67 10.76 S 5.10 W -0.96 2.90 0.35 N 4.78 {4 14.48 2.22 15.91 N 3.05 W 33.93 2.90 35.28 N 57.59 1.70 59.03 N 83.64 0.56 85.34 N 110.27 1.20 112.31 N 137.01 2.54 139.45 N 166.92 2.16 169.16 N 199.93 1.52 201.57 N 235.39 1.27 236.10 N 272.83 1.50 272.31 N 312.28 1.60 310.20 N 14.49 S 2~ 17 W 15.24 S 22 55 W 16.60 S 21 8 W 17.8o s 19 2t 18.86 S 17 49 ) .,. 19.63 S 16 31 W 20.11 S 14 3O W 20.42 S 9 52 W 20.58 S 4 21 W 20.48 S 0 20 E 20.33 S 4 16 E 20.23 S 7 23 E 20.21 S 9 ~.5 E ZO.11 S 11 30 E 19.90 S 13 6 E 19.64 S 13 39 E 19.14 S 13 56 E 18.40 S 14 7 E 17.72 S 14 2 E 17.4H S 1Z 56 E 17-30 S 9 56 E 17.35 S 6 1 E 17.50 S Z 5 E 17.55 S 1 33 W 17.49 S 5 14 17.2¢ S 16.6~ S 14 q,$ W 11.91 S 25 ZZ W 4.79 N 85 45 W 16.20 N 1D .52 W 0.10 W 35.28 N 0 10 W 2.84 E 59.10 N 2 45 E 5.53 E 85.52 N 3 42 E 8.02 E 112.59 N 4 5 E 10.32 E 139.83 N 4 14 E 15.17 E 169.84 N 5 7 E Z1.83 E 202.75 N 6 11 E 30.06 E 238.01 N 7 15 E 39.58 E 275.17 N 3 16 E 50.5~ E 314.29 N 9 16 E C~MPUTATIDN DATE: 5-0CT-90 PAGE BP EXPLORATTON P-13 (32-31-11-13) PRUOHOE BaY NORTH SLOPE· ALASKA D,~TE OF SURVEY: ZO-SEP-19gO KELLY 5USHING ELEVATION: 91.23 FT' ENGINEER: WES'T INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SE~ COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 8000.00 7940.51 7848.68 25 23 8100.00 8030.28 7938.4.5 27 2 82,00.00 8118.97 8027o14. 27 40 8300.00 8207.31 8115o4.8 27 55 8400.00 8296.05 8204..22 27 30 8500.00 8383.85 8292.02 29 50 8600.00 8469.49 8377.66 32 12 8700.00 8553.30 84.61.¢7 33 4,2 8800.00 8636.54 854.¢.71 33 4.2 8900.00 8720.15 8628.32 33 10 900'6.00 8803.97 8712.14 32 58 9100.00 8887.78 8795.95 :33 4 9200.00 8971.64 887g.81 33 24 9300.00 9053.91 8962.08 35 48 9400.00 9133.79 9041.96 137 46 9500.00 9212.85 9121.02 37 46 VERTIC&L DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST gIST. AZIMUTH FEET DEG/IO0 FEET mEET FEET DEG M[N N 18 47 E 353.86 N 18 38 E 397.84 N 17 10 E 4.43.99 N 17 3.3 E 490.84 N 19 22 E 536.90 N 20 56 E 584.60 N 18 49 E 636.06 N 17 42: E 690.56 N 18 49 E '745.93 N 20 24 E 800.67 N 21 2 E B54.99 N 19 I E 90'9.37 N 17 11 E 963.78 N 14 52 E 1020.60 N 13 48 E 1080.71 N 13 48 E 1141.91 1.62 2.29 0.67 1.58 I .63 2.8¢ 2.91 0.53 2.81 0.89 349.78 N 63.40 E 355.48 N 10 16 E 391.40 N 77.86 E 399.07 N I1 15 E 435.42 N 91.82 E 444.99 N 11 54 E 4'B0,20 N 105,63 E 491.68 N 12 24 r .-, 523.92 N 1'20.30 E 537.55 N 12 56 ] ,, 568.81 N 136.8'5 E 585.04 N 13 32 ~ 617.27 N 154.61 E 636.34 N 14 4 E 669.15 N 171.44 E 690.76 N 14 22 E 721.82 N 188.66 E 746,07 N 14 39 E 7?3.49 N 207.12 E 800.74 N 1,4 59 E 1.10 1.02 2.99 2.34 0.00 0.00 824.51 N 2,!6.35 E 8'55.01 N 15 21 E 875.64 N 245.35 E 909.37 N 15 39 E 927.33 N 262.58 E 963.78 N 15 49 E 981.95 N 278.22 E 1020.60 N 15 49 E 1040.25 N 292.89 E 1080.7'1 N 15 ,43 E 1099.73 N 307.50 E 1141.91 N 15 37 E COMPUTATION DATE: 5-OCT-90 PAGE BP EXPLORATION P-13 (32-31-11-133 PRUDHOE BAY NORTH SLOPE, ALASKA TRUE SUB'-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MZN DATE OF SURVEY: ZOLSEP-1990 KELLY BUSHING ELEVATION: 91.83 FT' ENGINEER: WEST INTERPOLATED VALUES FDR EVEN 1000 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDIN~T'ES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH E~ST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 -91.83 0 0 1000.00 1000.00 908.17 0 7 2000.00 1999.99 1908.16 0 6 3000.00 2999.97 2908.14 0 22 4000.00 3999.92 3908°09 0 23 5000.00 ~999.83 ¢908.00 0 43 6000.00 5999.80 5907.97 0 38 7000o00 6995.77 6903.94 12 44 8000.00 79¢0.51 7868.&8 25 23 9000.00 8803.97 8712.14 32 58 N 0 0 E 0.00 0.00 0.00 N, 0.00 E N 14 1Z W -.1.29 0.00 0.98 S 1.30 W N 82 4 E -0.18 0.32 0.81 N 3.54 W S 39 17 E -5.71 0.09 4.94 S 3.52 w S I 27 W -14.33 0.3'1 13.20 S 5.96 W N 80 57 E -19.10 0.3'7 ZO.Z7 S 1.51 r- S 84 8 W -15.59 0.23 17.0~ S 2.gB ~ N 8 19 E 33.93 2.90 .35.28 N 0.10 W N 18 47 E 353.86 1.62 349.78 N N 21 2 E 854.99 1.10 N 1.3 48 E 1141.91 9500.00 9212.85 9121.02 37 46 0.00 0.00 N 0 0 E 1.63 S 53 10 W 3.64 N 77 8 W 6.06 S 35 28 " 14.49 S 24 17 20.33 S 4 16 b 17.30 S 9 56 E 35.28 N 0 10 W 53.4D E 355.48 N 10 16 E 824.51 N 226..35 E 855.01 N 15 21 E 1099.73 N 307.50 E 1141.91 N 15 37 E COMPUTATION DATE: 5-0CT-90 BP EXPLORATION P-1,3 (32-31-11-13) P~UDHOE BAY NORTH SLOPEr ALASKA DATE OF SURVEY: ZO-SEP-1990 KELLY ~USHING ELEVATION: 91.,!33 FT ' INTERPOLATED VALUES FOR EVEN 100 FEET OF SU~-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -91.`83 0 0 N 0 0 E 91.83 91.83 0.00 0 3 N 18 48 E 191.83 191.83 100.00 0 13 S 36 O N 291.83 Z91.83 200.00 0 17 $ 46 15 N 391.83 391.83 300.00 0 12 S 58 29 W 491.83 491.83 400.00 0 14 S 55 21 W 591.83 591.83 500.00 0 2 S 8 19 W 691.83 691.83 500.00 0 6 N 59 31 N 791.83 791.83 'TO0.O0 0 8 S 5Z 23 W 891.83 891.83 800.00 0 5 N 84 49 E 991.83 991.83 900.00 109 .83 1091.83 1000o00 1191.83 1191.83 1100.00 1291.84 1291.83 1200o00 1391.84 1391.83 1300.00 1491.84 1491.83 1400.00 1591.84 1591.83 1500.00 1691.84 1691.83 1600.00 1791.84 1791.83 1700.00 1891.84 1891.83 1`800.00 0 7 N 5 13 W 0 9 N 60 58 W 0 10 N 64 40 W 0 24 N 45 4 W 0 14 N 45 11 W 0 5 N 43 25 W 0 5 N 10 7 E 0 13 N 60 39 W 0 13 N 56 41 W 010 N 72 I W 1991.84 1991.83 1900.00 2091.84 2091.83 2000.00 2191.84 2191.83 210O.O0 2Z91.85 2291.83 2200.00 2391.85 2391.83 2300.00 2491.85 2491.83 2400.00 2591o86 2591.83 2500.00 2691o86 2691.83 2,600.00 2791.86 2791.83 2700.00 2891.86 2891.83 2800.00 0 6 S 84 3 E 0 19 S 37 Z W 0 31 S 27 I W 0 37 S 21 53 N 0 26 S 13 21 W 028 S 0366 0 24 S 14 9 E 0 17 S 35 16 E 0 16 S 37 37 E 0 11 S 36 10 E 2991.86 2991.83 2900.00 3091.86 3091.83 3000.00 3191.87 3191.83 3100.00 3291.87 3291.83 3200.00 3391.87 3391.83 3300.00 3491.88 3491.83 3400.00 3591.89 3591.83 3500.00 3691.89 3691.83 3600.00 3791.90 3791.83 3700.00 3891.90 3891.83 3800.00 ENGINEER: WEST 0 22 S 38 42 E 014 S 15 10 E 0 lB S 3 12 W 0 28 S 10 55 W 0 40 S 17 57 W 0 47 S 24 56 W 0 35 S 25 14 W 0 40 S 24 11 W 0 36 S 21 31 W 0 28 S 11 25 W VERTICAL DOGLEG RECTANGULAR COORDINATES HOR'IZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/NEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET OEG MIN 0.00 0.00 0.00 N 0.00 E 0.06 0.24 0.0'7 N 0.02 w -0.09 0.07 0.07 S 0.09 W -0.51 0.11 .0.41 S 0.41 W -0.83 0.00 0.66 S 0.69 W -1.04 0.00 0.80 S 1.00 W -1.28 0.08 1.00 :S 1.15 W -1.24 0.09 0.96 S 1.17 W -1.34 0.00 1.01 S 1.36 W -1.44 O.1Z 1.10 S 1.3,9 W 0.00 N 0 0 E 0.07 N 19 25 W 0.12 S 52 9 W 0.5,8 S 44 37 ~"'- 0.96 S 46 13 1.28 S 51 33 ~, 1.52 S 48 69 W 1.52 S 50 ,~4 W 1.70 S 53 24 'W 1.78 S 51 38 W -1.31 0.00 0.99 S 1.30 W -1.20 0.00 0.84 S 1.44 W -1.18 0.05 0.75 S 1.68 W -0.97 0.10 0.42 S 2.08 W -0.69 0.00 0.03 S 2.46 W -0.,55 0.00 0.18 N 2.65 W -0.45 0.61 0.30 N 2.71 W -0.36 0.07 0.46 N 2.96 W -0.25 0.00 0.67 N 3.29 W -0.17 0.23 0.84 N 3.60 W 1.63 S 52 41 W 1.67 S 59 64 W 1.84 S 65 56 W 2.12 S 78 40 W 2.44 S 89 15 W 2.65 N 86 7 W 2.73 N 83 45 W 3.00 N 81 10 W 3.35 N 7,8 .27 W 3.70 N 7,6 57 W -0.19 0.10 0.81 N 3.56 W -0.21 0.99 0.81 N 3.62 W -1.03 0.08 0.06 N 4.02 W -1.98 0.67 0.82 S 4.38 W -2.95 0.41 1.74 S 4.70 W -3.67 0.38 2.48 S 4.74 W -4.66 0.91 3.31 S 4.69 W -4.87 0.27 3.82 S 4.40 W -5.13 0.65 4.18 S 4.08 N -5.36 0.07 4.50 S 3.81 W 3.65 N 77 11 W 3.71 N 77 .26 W 4.02 N 89 4 W 4.46 S 79 21 W 5.01 S 69 38 i' 5.36 S 62 25 k ) 5.74 S 54 45 W 5.82 S 49 2 W 5.84 S 44 18 W 5.89 S 40 15 W -5.,58 0.00 4.90 S 3.55 -6.00 0.03 5.29 S 3.33 -6.42 0.16 5.74 S 3.30 -7.04 0.09 6.35 S 3.40 -8.05 0.17 7.33 S 3.68 -9.32 0.31 8.51 S 4.17 -10.47 0.60 9.55 S 4.70 -11.$6 0.18 10.55 S 5.18 -12.68 0.15 11.59 S 5.63 -13.57 0.38 12.45 S 5.88 6.05 S 35 56 W 6.25 S 32 11 W 6.62 S Z9 52 W 7.21 S 28 11 W 8.20 S 26 38 W 9.4'3 S 26 7 W 10.65 S 25 11 W 11.75 S 25 8 w 12.88 S 25 55 W 13.76 S 25 17 W COMPUTATION DATE': 5-0CT.-90 PAGE BP EXPLORATION P-13 (32-31-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH OEG MIN DEG MZN OATE OF SURVEY: KELLY BUSHING ELEVATION: 91.83 FT ENGINEER: WEST INTERPOLATED VALUES FOR EVEN 100 FEET DF SUB-SE~ DEPTH VERT[CAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 22 S 4 28 W -14.27 0.40 13.15 S 5.96 W 0 33 S 4 27 E -15.05 0.15 13.96 S 5.9~ W 0 47 S I 58 W -16.42 1.11 15.37 S 5.98 W 0 46 S 7 4 E -17.67 0.00 16.69 S 5.91 W 0 34 S 9 54 E -18.78 0.25 t7.8'3 S 5.78 W 0 31 S 22 11 E -19.57 0.16 18.75 5 5.61 W 0 33 S 60 Z E -20.09 0.81 19.43 S 5.11 W I 6 S 72 52 E -20.31 0.29 ZO.O7 S 3.64 W I 8 S 82 31 E -20.2.0 0.87 20.50 S 1.71 W 0 53 N 82 58 E -19.72 0.00 20.49 S 0.00 W 3991.91 3991.83 3900.00 4091.91 4091.83 4000.00 4191.92 '4191.83 4100.00 4291.93 4291.83 4200.00 4391.94 4391.83 4300°00 4491.94 4491.83 4400.00 4591o94 4591.83 4500.00 4691.95 4691.83 4600.00 4791o98 4791.83 4700.00 4891.99 4891.83 4800.00 0 44 N 81 30 E -19.14 0.44 20.29 S 1.41 E 0 33 N 77 17 E -18.64 0.25 20.08 S 2.53 E 0 24 N 72 18 E -18.27 0.00 19.93 S 3.37 E 0 22 N 67 40 E -17.91 0.41 19.72. S 3.96 E 0 18 N 51 13 E -17.46 0.33 19.41 S 4.48 E 0 13 N 6 22 W -1'7.14 0.10 19.12 S 4.6¢ E 0 25 N 3 53 W -16.69 0.09 18.64 S 4.61 E 0 2,5 N 10 28 W -16.01 0.06 17.91 S 4.50 E 0 15 N 33 0 W -15.39 0.82 17.21 S 4.32 E 0 25 N 73 55 W -15.34 0.31 17.05 S 3.97 E 4992.00 4991.83 4900.00 5092.01 5091.83 5000°00 5192.01 5191.83 5100.00 5292.01 5291.83 5200.00 5392.02 5391.83 5300.00 5492.01 5491.83 5400.00 5592.02 5591.83 5500.00 5692.02 5691.83 5600.00 5792.02 5791.83 5700.00 5892.02 5891.83 5800.00 0 37 S $4 3'3 W -15.56 0.26 17.03 S 3.0'7' E 0 44 S 76 6 W -16.07 0.33 17.23 S 1.92 E 0 33 S 84 0 W -16.63 0.20 17.48 S 0.71 E 0 40 S 89 33 W -16.99 0.19 17.55 S 0.38 W 0 36 N 75 26 W -17.2.0 0.31 17.44 S 1.52 W 0 51 N ,67 44 W -17.15 0.30 17.06 5 2.67 W 1 10 N 43 47 W -16.73 1.62 16.21 S 4.13 W 4 49 N I 19 W -12.38 3.63 11.43 S 5.09 W N 3 13 E -1.88 2.91 0.58 S 4.84 W N 8 27 E 13.45 2.22 14.88 N 3.Z1 W 5992.03 5991.83 5900.00 6092.03 6091.83 6000.00 6192o04 6191.83 6100.00 6292.05 6291.83 6200.00 6392.05 6391.83 6300.00 6492.06 6491.83 6400.00 6592.07 6591.83 6500.00 6692.22 6691.83 6600.00 6792.81 6791.83 6700.00 7 23 6894.02 6891.83 6800.00 10 N 8 20 E 33.06 3.06 34.42 N N 5 59 E 57.32 1.71 58.76 N N 5 59 E 84.34 0.50 86.05 N N 3 23 E 111.96 0.93 114.04 N N 8 6 E 139.98 2.60 142.42 N N 10 45 E 171.84 2.33 174.01 N N 12 55 E 207.45 1.31 208.92 N N 14 2.6 E 245.99 1.35 246.37 N N 15 55 E 287.21 1.13 286.16 N N 17 51 E 331.24 1.60 328.29 N 6995.97 6991.83 6900.00 1Z 36 7098.94 7091.83 7000.00 14 43 7202.63 7191.83 7100.00 15 45 7306.51 7291.83 7200.00 15 28 7410.50 7391.83 7300.00 16 48 7515.51 7491.83 7400.00 18 42 7621.69 7591.83 7500.00 20 28 7728.87 7691.83 7600.00 21 42 7837.04 7791.83 7700.00 23 5 7946.31 7891.83 7800.00 24 31 14.44 S 2.4 22 W 15.17 S 23 3 W 16.50 S 21 15 W 17.70 S 19 31 ~ 18.79 .S 17 !55 ,.. 19.57 S 16 39 W 20.09 S 14 44 W 20.40 S 10 18 W 20.58 S 4 47 W 20.49 S 0 0 W 20.34 S 3 58 E 20.24 S 7 10 E 20.21 S 9 36 E 20.12 S 11 21 E 19.92 S 13 0 E 19.68 S 13 '38 E 19.20 S 13 54 E 18.47 S 14 6 E 17.74 S 14 5 E 17.51 S 13 6 E 17.30 S 10 13 E 17.34 S 6 Z1 17.50 S Z 20 E 17.55 S I 14 W 17.51 S 4 58 17.27 S 16.73 S 14 17 W 12.51 S 24 1 W 4.87 S 83 6 W 15.22 N 12 10 W 0.23 W 34.42 N 0 23 W 2.82 E 58.83 N 2 45 E 5.60 E 86.24 N 3 44 E $.lZ E 114.33 N 4 4 E 10.71 E 142.82 N 4 18 E 16.07 E 174.75 N 5 17 E 23.50 E Z10.24 N 6 25 E 32.67 E 248.53 N 7 33 E ~3.47 E 289.44 N $ 38 E 56.29 E 333.08 N '9 44 E COMPUTATION DATE: 5-OCT-g0 PAGE 8P EXPLOR,~TION P-13 C32-31-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: ZO-SEP-199, O KELLY BUSHING ELEVATION: 91.33 FT ENGINEER: WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF SU~-SEA 3E.'?TH TRU'E SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 8056.99 7991.83 7900.00 26 13 8169.36 8091.83 8000.00 27 36 8282.,7 8191.83 8100.00 28 5 8395.25 8291.83 8.200.00 27 27 8509.21 8391.83 8300.00 30 5 8626.48 8491.83 8400.00 32 43 8746.28 8591.83 8500.00 33 41 8866.17 8691.83 8600.00 33 10 8985.53 8791.83 8700.00 32 58 9104.83 8891.83 8800.00 33 3 9224-17 8991-88~ 8900.00 ~4 0 9347. 1 9091. 9000.00 6 55 9,73.,2 9191.83 9100.00 37 ,6 9500.00 9212.85 9121.02 37 46 VERTIC*L DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NO.RTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN N 19 26 E 37B.6C N 17 13 E 429.79 N 17 10 E 482.63 N 19 19 E 53'.72 N 20 54 E 589.17 N 18 10 E 650.25 N 18 O E 716.18 N 19 49 E 782.22 N 20 47 E 847.15 N 19 0 E 912.00 N 16 32 E 977.24 N14 2 E 1048.55 N 13 48 E 1125.64 N 13 48 E 1141.91 1.99 , 0.80 1.20 1.54 2.71 1.94 0.76 2.50 0.53 0.87 373.19 N 71.56 E 379.99 N 10 51 E ~21.85 N 87.62 E 430.85 N 11 44 E 472.36 N 103.17 E 483.49 N 12 19 E 5,21.85 N 119.58 E 535.38 N 12 54 573.10 N 138.49 E 589.59 N 13 35 630.7¢ N 159.12 E 650.51 N 14 10 693.55 N 1'79.29 E 716.35 N 14 30 E 756.tl N 200.75 E 782.31 N 1, 52 E 817.15 N 223.54. E 8,47.18 N 15 18 E 878.14 N 246.21 E 912.00 N 15 40 E 2. 0.00 0.00 940.20 N 2&6.SB E 977.24 N 15 49 E 1009.02 N 285.18 E 1048.55 N 15 47 E 1083.92 N 303.61 E 1125.64 N 15 39 E 1099.73 N 307.50 E 1141.91 N 15 37 E SCHLUMBERGER O I RECT I ONAL SURVEY COMPANY BP EXPLORATION WELL P-13 (32-S1-11-13) FI ELD PRUOHOE BAY COUNTRY USA RUN ONE DATE LOOOED 20 - SEP - 90 REFERENCE 74091 ..~ELL'-P-13 (3Z-31-11-13) (Z496' NSL, Z171' EWL, SE( ", T11N, R13E) HOP-Z-70NTAL PROJECTION NORTH ] 400 REF 7409 1200 ]000 8OO 6OO 400 ~'00 SOUTH -200 SCRLE = 1/200 IN/FT ~T':%+?,-'..*":'""-..-?'::'"."-'~"~t'?'~ ....... t.-.~-.-?'.-f---t---*~.-~--? ...... , - ., 4- . - .*- - -,, -- - -: --- :-- +- - .* ...... .*..-.*-4---.*---~--4-:.--+-..:.-~---,:--.*'...+..-~-.-~...?"-..~....:..~ ....... ~---~.-:..-:.-.b.~...:...~ ......... :..;...:..-:.- :..:..;-.:. --:-r--.*-~-±-f--+--t-~ ...... t-4-+--H.+f--k-.*---.--4--+-4'--HH---~.+4-.-.-4---H..-HH--,:--4--4 ....... .~-4.--::---M.--:-.-':-.i-.4..~-.I-i-.:...~-.4..4...~..,L-: ...... :.-.L.4..4...I...;...~...L..~ ...... L.~...;...L.I...L..~...L.L.. ~ . ~ . : : : : : ; ; : , : : : : : : : : : : : : : : : : : ~ : : : ; : : : : ! : : : . , . : · : : : ; . ~ · : : : : : : : : : . : : : : . 4_. ~'-¢~H44~4-+4~4"~+~4-~i~-½~!~4-4~+-H~4~4~+~4~:~-L4-~:~-~4~L-:;.~&-~4~4~4~+f%~f .... +-4--+.-~ ..... .*-f--4--+-- -.+-+-f---t ....... t---?'---t.--.*---' --t---~--4-.-.* ...... 3----:---;,---* ..... ~---,~.-!..'..-f ....... ~...*..4-..;,...,,....~....;,_..~.....~_.~4_4_i_,14_L4_~ ~.:~''.4'''*.'.4'4.'4.'''*-''':''''~''';1~ ....... ;"";'";'":'"~"~ ~ ~ ~i~ ! i i;"'"'"';'""~ ...... '~-'~'"';"~:~: '~ .... 1 ;""~'"';'"':'"' 4C4-~k~4--t~4-4~4~1~4~4~1-*~4~4~4~:~4.~4~1~4~4~1-`:: ...... ':,....~-.L..~-4-i-4-4...i ...... ~-4-4...L..14 ."~ ~] Ti ? t' ] 7"'T'"T ...... *:."T"T"'F',,.'".,'"'F":.-'7'-"?'"T"'.?"T'T"'...-'?'FF ~ : ; , : i : : : : : : : : : ~ ~ : : : : : : : : : :~.: : ~ : , : : : :'[ ~ .'II ? ~ ? ~ : T"?'"~ ....... '.."T'-f""[.'","'?"'T":'"'~ ...... T'"?"'?"'T"t'"':"'?"'T'':'" '?-'~."-~-4"f-f"-F-~ ..... .*'~"'+-"~"t"4"~'"'~"t ...... ?-?-"~"4'"~'"?'"4"4'-'+"- -4-'~'"'~"'?' , '~."~.'-f-' -'4"4-4-4~'~"'-'"4'--4'.--*.-- --4--*.4...4..-,-4--4---4...-* ....... *.--*.--*.-4---{.--*.-.4-,,;-.-.} ...... 4-.-:-. 4-4.-f--4 ..... ;- :- [...b~...~...~ -.-t-t-+w-,-x-+-:-r,----t-i--~---t-:-t-m.t-.-i:: ,-??t--t--+ :-ri--.?~-i-t--t-+~.~.+--H-++.' .f.+-.~--..~ ...... 4--4-4..4 ...... H-.4...~... ....... L.L..L..?':...b.i..4...i...L.. '-i-;--t-:*--±4--.+--..*---?"--~---- -~ -t:~'.-t--::.--T-2---t:--t-'-t ....... t.--%f-%:%-+~i.-"-I.-~..%.5-f-+..H~+--.~-4-4---.,.:--H.---H--4 .... H-4---,:---44--4--4 ...... ,:-.+.4.-4--- .-4--4-.4.-4 ....... 4..4.--i-.H-..4..-H-.i--. ,.4--~--.*-} i ." 7"~"-'-4--4.-4---4 ..... -i--4.-.4-.*.-+-4-4--4--4..-,--4-.4-.4..4.. i i ~ i ! i i , [ ~ ; [/ ." i ~ ~'"4"4'"4~-4 ...... 4--4---4---*-4-4--4-.4-4----4-.-~--~--'~ [ : I }' .... 4--i-4.--i ..... i--4--i-.4..... 4-4.-~-i -: : 4 i 4 -: 4 4 : 4 ~ ~ : ~ --'t'-t-l'-'1;'l'"?-?-, '1'."!-. ' '"1:-?-?"'T'"1'-~"-"?'"1:"- "?-'?~-!'"'?'"'f'".'t"'!"-?-' .'t'" ' -'.+'-".'"?-'?'"l"-t'".+-?''~'''' "-'~-'1"4-'t'4--'~;.14_~ .-.;,,-4.L..4..-i..- ,-.4-~.--4--4 ....... *.-.-;--4...4 ....... *...*...~..4 ....... 4..-*...4--.4..-4.. *..4...4-../. : ~ ~ : ' ; ' ' ! ! / ! ! ~ t? I ~f-f:--~sd--i--is-H-i-b]--fi--f-i.--.-~-f-i--.,:.id--f.H----~--+-i-.-H-.-H--~ ~-~-!-..:'--H--+-i i-~.-4.H-4-H-~....i-4--4...4 ..... i.H..i ...... i-..bi...]---t-..i..-i--i.--4 .... C ji--.++i-fi'-i--,-i--f-t'i---"-fffi ....... f'i-fd'i"i"ff'h!'-i"-f-Df'+-f'¢-fi-'-i"fi-i/'i-i'--f-H ...... H"'H ....... i-H"i ...... H"i"i ...... i-..i--.Ff ...... H--H ....... H.H-.. ~ , .-,-~ -,.-~.-..-.-,--,.-,,-,-.-~-- -?-f -, +-4- ..m.'--4-+- ~-+-, f-4-**-f..4 -. 4~ .... ~4¢4 4- ' ................... ' ' -4-.4-.'.4-~.4--r-~.4.-..4--4.-4.4.-- .4-4-4--:-.- :_: L: _' '_: :_._: : : '--: : ' '-' · : ~' : : : : ~ : : : i · , , { '}~ i I' ?'I', ~ .+. ~ %% "t-T-f-*: .... -i-..' i i i ~-!...-i i i"~--...-f--t..:-i-i"i'!-..'. ~-i"i"7'-t-!-~"'-t;"i-'1'!' .-t-t-~--..~ -&4-4.. '.-L, _4_4-4-4_. :..~.4..4_4 .... .L..,'_I..4 ...... ,i._~...~...~ ....... .L4..4.-L.. ~'"': ': 'iT ,,'-mm, , '-,-?'r-~-,,,, -. ,?-"~-'~: , ----,.~-.~-.-r-f--..,-t:----:---.t.',,,,,,,,, ...... , *"'*~,, ,'1 -+, ,'rat'-t:,, ~H-H--.':-b.bH-.--~-4--4-.4 ....... b-~-.-~-4 ....... .L4..4..4 ....... .4-:: ~--~.,.-~-, : .: :-.~,--,-,-~--~--,--,.--,b----.*...--1---l~.-~..'4 .......... ~-'-'-~-"-*-'--~+'*'-:-'"'-"-'-'~ ..... ';"t'i-%-"t'"t"t'~ ...... H"'t"lf"!"i"~-'t"!-' -~ l: :: : i : : -~4-44-J,-4....-gs-~.--,"..4--bS.4-..L.4--4-4---4-.4-~.4-b..L:-~-: -~JZ.-.L-'l': .:..: .... : : i i i ."- i : i [ii: l il;: :' '" : :i"4'~.~ : : : T-'4_~..' ':~ 'Y' "~': : ~ '"~'~'-~: '~' Ti :*"~ ~.'-[.' .? :T' -'~'"T"?-T;-'~'"Y'?-Y-T:"'"'?"?"'~-?"¥T'-?~-'?"' I i 4..-I-. 4-£4..4- ~-?---r-*-.Jm.---~---?--- '?~-?"*-~':-?'l'-?'-".*'?".*: .~-4--+- -.* .- ~ ~ ~ -t-f-4 ...... t-.-+-4-l--f-f..4.-4- -:.:-.: ~--~-.:~.~--.~-,-:-,--~-~-~-,.-..~-~-.:-,-,-~,.~-:---~***.~-~-~-~-:_ .-~-~....~..u_.:_..~_.:_~_,....,~_:..~ ..... ~..~..~.~ ...... ~...~..~_~ ...... ~..-~-. ~...~.-.t.--~-.~..1:-.-~-- 4444-- ~ .1.: ...: il 1.: i ,." .:. ~..,-..~_.~...:_?..?~.~~_,..,.~_:_~..?_.. ..... :?,?. _,.. ?-?-?.--~?l..:-.,.--...-?.-,...?l.. "?"?'"'"? ..... '"'?'"' ....... ~ ....... ~"T---T'TT :--F :--'~-TT' -TT"~T !'~- .'.'m---': ~'~-~m'-T'~'f't-?~--h' ~"H '+~f-' -"H:l+'+-'' .'Hb'~-4- "4-: ~- '.-bS.-- .-4---H-H -.H--.,b4---l-4.4-.4.-.b "TTT- :"~- ~-'Y-' 'T- ':. } :I'-T" ,-'~'7-', ~-?....'-T~..- '- 1.4- :'Y?lF'41"'??'~.~ "?'- --f' .'"H+'4..--~'+'4-f~-J .~.i.--;-4--4-- -4.~--4-4-- -4--4--4.--4 -:. :~4-4--- - '-.g-4-.4--4 ...... :-.i--*.4. ..... :--4.4..4.-.-]--4-4..4.--:--- -V?"['~l.'---t--r'+'+'--+-+'H'.-H-~--i-l'H-~ '-H+-.-+-.+-4--+--~-~---.*--4--4.---q':--½-+~--~-4~- j,: : .: : :: : : : : : : : ,: : : ~: : : : i ......... ...... :l..: :~::..: ... : ~ :. : : : . ....... :~::: ~, L:~"F:"~..-"~-..'"'T-..'y--ff-~-~-?-'--T~.."-f'-.t--'~'-~--yff- .-~-.*~...?:..~ ...... -?-.'L-f-T-11.--f-'-'f..'..ff-.-'? ...o--." l'"-i-':---L:ll L-' ., -'--' " -' * "4 J--LLLLLs-4--'~-' ' ':: .......... ' ': ............... JLS-LLS& ..44.4.-4-b.1-L.?L.L...4._'.:LS_.L...-iS.4..4..._-1_4_4_4 ..... L.1...i-4 ...... ~,....;_.L.; ...... ~..4...~...~... 4.4- :-L.LS- .'.L::.4.-L~ -4-4_4.4. A..~4..4.4_...4_;...LS..J._ .;_.LS_-:' .~ ~.LLL.~_ ; ...... , .......................... --,i--~-4--~-....4.-.-;,.-~-4-. -4-4..4-4.-. ,..4-4...4..-4 ...... 4.-.4--4-4-- ..4-..4..-.-;.-4 ...... ;,..-*...4.,-.,; ...... *.-4--4..-..;.-. } .~ i i ~ i .: ~ ~/ ........ ~ '-'4.'"*'-4.'"* L~..4-4...i ........................................................ 4..4"~ ...... ..... m..4..4... -4..4"4"4 ...... ,..4..4..4 ....... ...__.__....__, ..4-4-4.4.--4.4-4-4-..4-4-4-.4-_~ _ &.. ~.~ H ~ i %H-+t~-++'+'- , .............. ~: ~-~.-.H-~-.:4--+H~ --.~H-4- -i-+-4-+-'-4+.*-+-'---,'-++-~-.. ~-~-+.4-+... ---~. 1-~,- 4- -t -4~4 -4-..4~- .-4-4-4--4....~ -4 - 4- 4-4 .... -4-~"f'~.' ..... i-4"q:'-f''' -~~f'~.'-'.* .... ! i'~.'"~.'-' : ~ .."~-~--.* .... 4.-.+4-4--- 4-4-.i--4 ....... I-4--¢4-- -4.-4--4--4-- -4"+"~-~ ..... ~,"+".~'4-' :-4.--H-4-- ""-"- ............ ....... ': ....................................... ~, : .:¢!~ ~ i"'7~ ~.+f", ..... .T"'~ ....H-f---,: ..... .~.4-4--:L-..-¢4--4..4.....4-4...4..4.- -4..4..4..4..-..4-.:...;-.4 ..... :...i...:..4......-4_.i...i...: .... 4: ! ~t 4-4-&.- -4-4~;4--4-4-4.4-4-.. ,-4-..4---4.-4-- -4-.4-4-4--- .-4-44---4-.4~44-4-4 ...... ~- 4 --~ 4 I1} - 4.- 4-4-- 4-4 4 4-..-:,.4-.4-.4-- -.4..4-.4-4 ..... *-4--*'-~~ - · 4- 4- 4-.-4. ....... *-.4--4-4- ~: :.~: ~ ~ i .-r..4--r-t-~-H-~-T--.?-' -..*"r:T'~ ..... t"?-?-"..-'-?-.'.-*~?'~.-4~-'-'.-'.'~.-~'-.-~-. ~.-',--~-.~4-4--~.-~.'--* .-+-.-+++f-..'..4-t-.*.-+--.-t.+.:..4.....+f--+-,... ~ i~'d-'?.::-h~-"??"t-?'ffS-?'?"?"'-?'!-'.t-i ...... ?';:"fi-'?'--??i"4/t-~i-'~ff-ff .... f~ff"-..": .... i'?.:-f'"'"f'i~ffS, d'4'"!"~ ...... !"?:'"ff"ff"':"'f"!'"H ....... !"i'"f"~ ....... ?""'hf"!- -4-~-.*'-4.--b~.4--..LL-.L4--4-~--.'-~-.+.~...i- _..L~_~...~......~..LS_.~ ...... -.:---~--~-~,!4.--L4-.-~ ...... ~..~--~...; ..... M--~--~ ..... H-.;.4-.:..~...L;...~ ...... .L~..;...;_:...;4...;.; ....... L;...;...L. ~ :' 4-4--~-L.4-F'4- .4--¢4-.*.-,-4-4-",-4.-. A-4-4-4--..4..-LJ-4-- --L.LS!~ .,~-~- -.'gS-L-i-...-i.. :. L~... ~ . LS_ L .:_ ~_~_ _L L ~ ~ ~ ~ ~ ~ ~ 4 ~ ~ ~ ~ ~ ~-' .-F ,:-4 ~ i :.f.l+_.;__ ~ . ._ -4-4-4-b.,.4-4-.4.4 ...... .;-4.--bs-.--4-3L-]ff..,~-4..4-bs-, '-g.4--k.' ..:,.-I.4..4-4-4-.-J,.-.l.-.~-:-~--Ls-.i 4--..-4.4-4-4. ~ ].-.~-4..-J, .~ : .* :4. .4-i ~ ~: ~..~--. --~H--.~--., ~--~q--.f--..~--~.f.. --~.e.~.~..-..~..~. ~ ~ -- --~. ~-- * ~--~ .... ~H~.4 .... *--~.~--~... ~---~-~ . --4. 4 --4 ~ ~ 4' ~ 4 -- ~ 4.,.4..~ ..... ;., 4 ..4 ,4. f-- 4 [ [ ~ [ i: ' : : : : : .... : ~ : : : : : : : i : ' i ! : ,1. ! ! ! ! i [ I I ! ! I ! i ! : i ; I ! i ! ! ! ! i i i i: Hf-H---~---[H-b: - -~-4 .:-]-..-H4-4-4.--..4-4-+4---+-~:'" -~ -f-H-t-.-+++-t-- t 'l. :: t: -t%+?.--f--,.-:---~ ..... *.4..4..4 ...... ,-4...4. .......... ,-4.-*..4-..~-.4 ......... = :: ~ r~-'-'~--"b4 .... +4.-4-...4_4..4...L. -..i.-4.-.i-4.- ..4-.:..4-4-- '-+-:/r- ;-F'-:'- -4..4-4,..4-...4.-4-4."-4-- ..4-.:-4.-.:,-..4.-,-i-4-...4---.~-.i-.:-1 'I -i --..:H--4.-4---[--i--.b4-.4-----4-?'-4-4:-.- -.4--4..4-{--- ?~'-li-H.' ~-k~ ~-~-~ +~"+'+.""-H-H .... H-H'-~-..q-,"- qlq..'~_,.4.4'.'_b4_ ~4-i ] ::4-4-4--4-----4--.-F4--¥. -i'+H"' '-'t..'--.H"~ .... ::-+".b'.:"':"+++l'~"' 4 ~-+ 1-++.'..-~ H-t:-.t--- .-t.'-f-f-4--.%-+--.,-.4....--t--4-~f-%, ..H.~. 4- 4..4--:.--:-..-4-4.-:.-.i- :..4-4,..4,_ -~.:-4.4.-~-4-.4-: ....... 4...4.--,.--.-4...4....4...4 ..... 4.-4..-i-:-41..4-4-4-4 : Iii J':i~' i~--.1--~-.-[-~.--'J-.1-:-~-.1-~--/-}'~/-il- [iii' i [ i [:ii il..': ] [ [ i : i ! ! ii:.: i : .: ~] '~'~1: ~ i , I i , : : : I : : , i : : : · : : · i~ ' ."t-'Y-1'-? i i ? i-~l'--tW?---.r-. ?-~--r--.-I-?---t-.-~- '"'r--r-'l--t" "'-*"4-'*.-'b--"4-4-4""b"i'-4'~-4--4-'l~4 ! I ·i ~ ~ i ~'-'~'~--'-4 '.--FH:'-t--H4-4 ...... --+-+-f~-++?-~ '-4-' .-i-Sm~.'-.-~ ~ ! -~ 4-4-4-4-4"4 ..... ~,-4-4-4-.--J,-4-4-.1 ...... ~,..4-4..4-.- ~ : : ~ ~ ~ : ~ ~ ' · !:i~-' -~'4i-I-~-~-F:TTR~-TTT-r''-T'T-T-rFT~T~ ~ ~: ~ i ~-+: 4_,_f_~. ,: ,:t-i ~ ~4"-~4..+ ..... +f+'"'?"h't'~ .... ~-i"i-~-'17'?'i"i ....... -~ ....... .t--~-4-~.., ...... 4 ...... 4. ........ *'.,.-*.-4.-.:::.FI:: :: ::i::~::: ::.:" ::: 7;;7: i: ~ : ! : ! ! : : i : ! ! i : : : i : : ! : i : i ] i [ i i i : i : : i i i : : : I : : i I ; i : : : : · : : : --: : : : : - : : : : : J i i i .: : I .1.' iTTT:I'T.:TTy-T"T:-T~ I i [ :'l i l i'[ ~ [ i : ~ : : : .: ~ .... : : : , i : : _ : : , , l i:i .-4-[ g[ 4:-4.-[ - .4-:: 4-~-]--4-4-4--4- :ii: ::: .... [] !J--~-Z :i!i ~:ii -.4-¢-.]---] ...... {--4~---{ ...... {...{...{....L-{...{...{..4...{.4...{...{-4..- · '+"i"'.?:-".:. .... ~ ~-~--:--:-~-~-.--~--:-~..-~----"-*--:-~---..:7:.-t-.~ ..... t-t?~ ...... t--f-!-'~ ..... f-f"?t"T"i"'!"'?? i!ii [!!! !!!! i!i!!ii!l~i~: ii!! -'-t-+-4--~ .... i ~ ~ ~ i i i i ~ ~ I : ~" ~ ;:" ~"; ':" "~' ~~~4-4.-,-.':.4-½~i-4~--~4..~.-~4-4-.-{-- ~'~ ...,.+;-:+-.-.;...,-.;.H-.,-..,-;-.,- 1~ F' I .~ ..: i ~ 4 4-4 ~_LI 4A-L4 ~ ; ; i 2~j iill ~.7 ~,T.~'..~J_-]~-i,]~_..k. HS..4_,.+4_..,.,..4 ..... :.--4.-.-k.b-~-.+-.H~..-~ ...... ,:...~.-.;.-~ ..... ½.-.*'-4-.~..- :~: 4. -- --i-4-4:I .i-+.4--4-4-. i : i 4..'.4,-.4-4 ,: :..u,.: !_-t~ ~ ...: ~ ,: , , ~ ~ ~ ....-,..--,-,.-..~-+4...4-.~-.;.4...4.-..:-..--~..,..~-.~... :i:i21 i- i! i47:HSZ..:-: 24-44.4.'--.1-..,..-,.--, :~;: ..,-4-.--,.-?.-.:, i i-f'i-'%i"'fi ..... ¢4..4..,."... .4..-,-4-4 ..... :...:.4..-:'.-...-:....,,...:-.i... Iii! 'ii! [ i i I iil :il I[ iii .... ; : : ' : ' ' : : : ' ....... ' ' .... A-L ii i i!i ~::': ,,::. ,*.~ ~:,~ .:-,-r-... ~---.H-,bi -+-.:-4."-4------i-4-H*.: ....... b4--.*'-4 ....... i-4.4-4..-4--i--:.'-4 ..... ,-.~--L-1.-..2~]~_-.?.: - , : ~: , ~ ~ i ~ ~ ~i !i'~.. ~: f-T-4-: :*- -4-~- :.4-~- 4-4_4_--[-.4-'..i.4..--.4-..,...: ~....[ .... ~." "'H"-.4..4~4--4 .... ~4 :.: ~.: :.+..-,~.--,~4 : : :: -4..4-4-,- --;.--4...,...; ....... :.4..4-4...--H.4...~ ...... H-+4.-. .4-.4..-b-.L- :]] i-l''l' , I i ~ : : , : : i : : , : : : .: i ~ : i ! : ; : ~ : ~ I i--- i . : . -600 -400 -200 0 200 400 600 800 1000 NEST ERST 'WELL-~ P-13 (32-31-11-13) (2496' NSL, 2171' EWL, SE(, .1, T11N, R13E) Vi ICAL PROJECTION 19B. -200 0 0 ~00 400 600 800 ! 000 ]200 !400 IS. Itl -t II z PROJECTION ON VERTICiqt. PLANE IG. - 196. SCI:ILEO IN V£RTICI:II_ DEPTHS HORIZ SCALE = I/2DD IN/FT AOGCC GEOLOGICAL MATERIALS iNVENTORY LiST PERMIT# ~ - /?/ WELL NAME COMPLETION DATE /,~. ! /,5' ]. ~'~ CO. CONTACT check off or list data as it is receiYed.*list rece~¥ed date"f~ 4§7;. if not rcouired'list as NR drillinu histo~' survev well tests core descri cored intervals core analysis dry ditch intervals di itai data i ' I nr~ -r,~nc i i RUN INTERVALS SCALE ':ii . ~_u~ , , rL ' ii ~. [to.the nearest foot~ .... [inchll BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :01/15/91 T#:82045 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. ~ A-30 Prod-F 12/15/90 ,~A-34A PITS 12/28/90 4 B-25 Prod-F/Jewelry 12/11/90 '-C-15 Prod-F 12/24/90 -'"E-02 ' - ' Prod-F/Jewelry ..... 12/20/90 "E-27 Prod-F 12/13/90 *'G-07 C CL/Temp 12/13/90 "' P- 13 Prod-F 12/27/90 ~. M-28 INJ/PITS 12/16/90 "-6-32 Prod-F 12/27/90 -,,S-29 Prod-F 12/21/90 '"W-40 Prod-F 12/14/90 '~.Y-14 Prod-f/PITS 12/23/90 '"Y-14 Jewelry Log 12/23/90 k,,, Y-19 Jewelry Log 12/22/90 #1 10650-11080 Camco 5" #1 8900-9190 Camco 5" #1 9800-101 64 Camco 5" #1 9350-9757 Camco 5" .... #1 .... 9675-9981 - - -Camco ..... 5". #1 9450-9720 Camco 5" #1 11150-11396 Camco 5" #1 9000-9380 Camco 5" #1 8750-8925 Camco 5" #1 10100-10540 camco 5" #1 12850-13190 Camco 5" #1 10200-10510 Camco 5" #1 9900-10401 Camco 5" #1 9600-10300 Camco 5" #1 8900-9701 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED JAN 2 ,~ 1991 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519.6612 (907) 561-5111 TO: DISTRIBUTION Date'12/19/90 T#:81950 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. P-I 3 Comp 12/15/90 #1 8647-9390 Sch 5" S-32 CBT 12/12/90 #1 9736-10605 Sch 5" S-32 CET 12/12/90 #1 9736-10625 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED JAN 1991 Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard rr.W£ ..o. R~,,C Anchorage. Alaska 99519-6612 (907) 561-5111 OC'[ 1 o 1990 TO: ARCO Date:09/27/90 CHEVRON T~:81707 EXXON MOBIL PHILLIPS TEXACO STATE OF A~SKA GEOSCIENCE ARCHIVES : BP OPEN HOLE FINAL Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. P-13 Mudlog 08/29-09/12/90 #- 2723-9500 Epoch Well Logging, Inc. GEOS/ARCO/EXXON/ARCHIVES ONLY. STATE ONLY: Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Date: Job~: Inforation Control Well Records LR 2-1 J.. Dietz/S. McCurry BP EXPLORATION OCT o 1990 TO: DISTRIB~ ~ ~ ~~ Date :09/27/90 ~ T~:81706 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 FROM: Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINAL~; Enclosed is your copy of the matedai listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. B-11 Prod-F 09/18/90 #1 10850-11016 Sch 5" G-01 Tubing Puncher/Cutter 09/21/90 #1 8550-9996 Sch 5" K-12 Completion 09/24/90 #1 8580-9340 Sch 5" P-13 CBT 09/20/90 #1 8802-9420 Sch 5" P-13 CET 09/20/90 #1 8802-9424 Sch 5" S-29 CBT 09/20/90 #1 12510-13280 Sch 5" S-29 CET 09/20/90 #1 10990-13300 Sch 5" Y-18 Completion 09/23/90 #1 11000-11261 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION RECEIV[. Anchorage BP Exploration (Alaskal Inc. 900 East Benson Boulevard F~). Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO' ARCO DATE: 09/18/90 EXXON T# 81 659 ~_~P~ -~ATE OF A~S~_~ ARCHIVES SYSTEM Tape & Transmittal Only BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the matedai listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. G-06 COL/Lis 09/14/90 #4 8890-9584 Atlas ECC~4582 Api#50-029-20358 1600bpi TP#07320 P-13 DIFL/caliper 09/08-11/90 #2 2713-9479 Api#50-029-22080 1600bpi Atlas ECC~4579 '~-"~::~ 5/./ TP#07321 ***ARCHIVES ONLY: Information Control Well Records LR 2-1 J. Dietz/S. McCurry August 14, 1990 Telecopy~ (907)276-7542 George W. Kirton PBU Lead Engineer BP Exploration (Alaska) !nc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Unit P-13 BP Exploration (Alaska) Inc. Permit No. 90-111 Sur. Loc. 2784'SNL, 2834'WEL, Sec. 31, TllN, R!3E, UM Btmho!e Loc. 153i'SNL, 252!'~L, Sec. 31, TllN, R13E, UM Dear Mr. Kirton: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill do~s not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE tests that it wishes to witness. Very truly yours, G i;-C. <:' Gommissioner of~ ~klaska Oil an-d~-~as Conservation Commission BY ORDER OF THE COMMISSION dlf Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 8, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton P-13 (32-31-11-13) PBU Enclosed, in triplicate, is form 10-401, our Application for Permit to Drill the above named well. Also included are the attachments listed on the application form and a check in the amount of $100.00 to cover the permit filing fee. The cellar and conductor is presently being installed, and a site survey is underway, which will be forwarded to you promptly. Also, the 1"=100' pad maps are not enclosed because there are no close approaches within 8000'. If you have any questions, please do not hesitate to call me. Yours very truly, G. W. Kirton PBU Lead Engineer GWK/KTH CC S. A. Leach Well File STATE OF ALASKA ALASI~A OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of work Drill [] Redrilll'-IJlb. Type of well. ExploratoryF'l Stratigraphic Testl-! Development OilEI Re-Entry [] DeepenVII Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exoloration KBE = 88' feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28288 4. Location of well at surfaCe 7. Unit or property Name 11. Type Bond(see 2o AAC 25.O25) 2784' SNL, 2834' WEL, SEC. 31, T11N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 1650' SNL, 2550' WEL, SEC. 31, T11N, R13E P-13 (32-31-11-13) 2S 100302630-277 At total depth 9. Approximate spud date Amount 1531'SNL, 2521' WEL, SEC. 31, T11N, R13E August 15, 1990 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(uDandTVD) pro p eArtDYL line 28264 @ 2477' feet Y-13 approx 8000' east feet 2560 9557'MD/9201' TVDfeet !16. To be completed for deviated wells ,17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 6600'feet Maximum hole anf)le34.26 o Maximum sudace 3330 pslg At total depth (TVD) 8800'/4390 pslg 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20' Cond. 80' Surface 110' 110' 13-1/2" 10-3/4" 45.5~ L-80 Butt 2650' Surface 2680' 2680' 1949 'cu ft Permafrost 9-7/8" 7-5/8" 29. 7# L-80 NSCC 9100' Surface 9130' 8848' 1281 cu ft Class G 8-1/2" 5-1/2" 17# L-80 FL4S 677' 8880' 8642' 9557' 9201' 153 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECF. IVED Intermediate Production Liner AUG o 8 Perforation depth: measured ~,Ja$~i~ ~il.& Gas Cons. ' ''~ ~ 60mmls.~0,,., true vertical ~,,,,[, 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch ~ ~ll~.~r~rogram [] Drilling fluid program [] Time vs depth pict [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify that the foregoing is true and correct to the best of my knowledge . "~ , ~ ,I/ Signed i:' ' .~..~,.~.. Title PBU Lead Engineer~ Date Commission Use Only Permit Number JAPI number JApproval date ]See cover letter ~d3 -'//J 150- o2.~- .~_ ~_o ~0 [ - 08/14/90 Ifor.other requirements Conditions of approval Samples required ,l~ Yes [] No Mud Io~'r~q~Cr/cl~Yes [] No Hydrogen sulfide measures [] YeseS' No Directiona_.l survey required '~ Yes [] No Required working pressure for DOPE 1-12M; 1-13M; J~SM; I-IIOM; I-I15M; Other: ~ (~~.~,. -- by order of ,_Approve~ ~ ~_~_.~-,~.~~. Commissioner ,ne commission Date Form 10-401 Rev. 12-1-85 ~_ Submit ir ~ate AFE No. PROPOSED DRILLING AND COMPLETION PROGRAM WELL P-13 [32-31-11-13] PBU Install and cement 80' of 20" conductor to surface. Install 20" diverter. The Drilling fluid program will consist of an 8.5-9.5 ppg spud mud in the 13- 1/2" hole, a 9-9.7 ppg water base mud in the 9-7/8" hole and a 9.0 ppg water base mud in the 6-3/4" hole. Drill 13-1/2" hole to 2700' MD and cement 10-3/4" 45# L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directional drill 9-7/8" hole to the 7-5/8" casing point above the Sadlerochit Sandstone. Run 7-5/8" 29.7# L-80 NSCC casing to within 10' of 9-7/8" TD and cement with Class G cement around the 7-5/8" shoe. The annulus will be freeze protected by dry crude. Directional drill 6-3/4" hole to TD. Run 5-1/2" liner from TD to 250' inside 7-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" float equipment. Change over to NaCL completion fluid. Test casing and lap to 3000 psi. Run 7-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. The well will be perforated with rig on location. Fluids incidental to the drilling of a well will be pumped down the 7-5/8" x 10- 3/4" annulus of the well. Tubing Size: 41/2", 12.6# L-80, TDS R-3 TBG with 7 GLM's. Tailpipe Size: sal: 7/11/90 4-1/2" TAILPIPE PRELIMINARY WELL PLAN Well: P-13 [32-31-11-13] PBU AFE NUMBER: LOCATION: Surface: Target: T.D.: 2784' SNL, 2834' WEL, Sec. 31 , TllN, R13E 1650' SNL, 2550' WEL, Sec. 31, TllN, R13E 1531' SNL, 2521' WEL, Sec. 31, TllN, R13E ESTIMATED START: August, 1990 OPR. DAYS TO COMPLETE: 23 Alaska United #2 MAX ANGLE/SECT COURSE/KOP/BUILD RATE: 34.28/N 13.9 E/6600/2.5 Item TVDss MD(BKB). Mud Wt. 20" CONDUCTOR 10-3/4" SHOE BASE WEST SAK FORMATION IKRU-PBU 7-5/8" SHOE TOP SAG RIVER SANDSTONE TOP SADLEROCHIT TARGET TOTAL DEPTH 110 8.5 2588 2680 9.5 5540 5632 9.0 7270 7376 9.0 8756 9130 9.7 8765 9140 9.0 8882 9282 9.0 8929 9338 9.0 9109 9557 9.0 LOGGING PROGRAM: OPen H01e - Record all logs on magnetic tape where applicable. 9-7/8" Hole: 6-3/4" Hole: GR/SP/DIL/BHCS, Mudlog, RFT in Createasous GR/SP/DIL/BHCS, GR/CNL/LDT, RFT optional sidewall coring with 4 arm caliper. Cased Hole CBT/CET and Gyro. Perforate before fig release. ~ sah 7/11/90 P~.OPOSED DOWNHOLE DIAGRAM WELL P-13 f32-31-11-13] PBld PROPOSED DEPTH BKB 20" Conductor 110 Ball Valve 2100 10-3/4" Casing Shoe 13-1/2" Open Hole 2680 2700 Calculated cement top 3160' 4-1/2" 12.6# L-80 TDS R-3 Tubing with 7 GLM's 7-5/8" Packer 883O 5-1/2" Tieback Assembly 8880 7-5/8" Shoe 9-7/8" Open Hole 9130 9140 5-1/2" 17# FL4S NT-80S Liner 5-1/2" PBTD 5-1/2" Liner Shoe 6-3/4" Open Hole 9487 9557 9557 SAL:7/11190 BOP STACK CONFIGURATION 13 5/8", 5000 PSI WP TRIPLE RAM ST ACK DRILLING RISER ANNULAR PREVENTER - I I 2" KILL LINE I I BLIND RAMS I MANUAL HYDRAULIC GATE GATE DRILLING SPOOL I PI PE RAMS I 4" CHOKE LINE HYDRAULIC MANUAL · GATE GATE SURFACE HOLE DIVERTER SYSTEM Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. 31 10" Full Opening Valves 35' or as required Dresser Sleeve 10" Diverter Line NOTES 1. All pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. 2. Manual 10" ~ valves mechanically connected to ensure that one valve is fail-safe open at all times. 3. All turns are 90 deg. and targeted. 10" Full opening ball valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet JWB 2/2O/89 _$45DUA124'. [DRANO13]P13_CLOSAP_SHORT. LIS~2 lO-dUL-1990 10' 55 P~ge --- Closest Appwoach Analgsis --- · Date 10-dOL-90 Time: 10: Few pwoposed mell' P-13 [32-31-11-13] ,,,., Top 63140~. O0 0~7~26. O0 -~2. O0 Note' All depths in ~eet Belom Kellg Bushing (BKB) i16i WELL IDENT .~. A02C~- 10001 O0 ..... A02C~- 1000~01 P-55 ,: :,' ....... -A'0'2~='1'000~O~5' : P-64 :,, A02C2-2054500 ........ MPTR'~ SUMMARY Closest Approach /PROPOSED\ /NEARBY\ CLOSEST TVD .......... DEPART ................ TVD ......... DEP'~RT-------~'I'STANCE ......... NO--C'OORDINATE'"~OINTS-WI'THIN-SPECIFIED-'SEARC'H-T4'I'NDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 'NO--~OOR~'I'NATE"POINTS'~WITHIN-SPECIF'IE~-SE~RCH--~INDOW Vertical Intersection /PROPOSED\ /NEARBY\ VERTICAL I'VD ...........D EP"A R T ........................ TVD .............. DEP A'R T Closest approach distance = 979~9~.0 ~eet KICK OFF ~o~ this ~un = O.O ~eet 1,191 _$45DUA12~:[DRANO13]P13_CLOSAP_SHORTT. LIS;2 lO-JUL-1990 10:55 Page --- Closest Approach Analysis --- Date' iO-dUL-90 Time' 10:50:46 ~earCh"RadiUs='~O0 ...... 7 DEQREE LEAD LINE For proposed well' P-13 [3~-31-11-13] Top .63145~.00 0~472~6.00 -~.00 Bottom 631615.84 5~8790.4~ 95~.00 ' Note: All depths in ~eet Below Kelly Bushing (BKB) ~ Closest Approach Vertical Intersection .~, WELL IDENT /PROPOSED\ /NEARBY\ CLOSEST /PROPOSED\ /NEARBY\ DEP~T ~D-- ~EP~RT-OIST~NCE -l~D' ~DEPA~T TVD ...... DEPAET ~: AO~-IO00100 ,.,- ..... · ,. A0~-1000801 '.,.. ........ NO-C'OORDINATE'"POlNTS-WITHIN-'SPECIFIED-SEARCH-WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW VERTICAL O'I"ST'ANC'E' 29 ~! P-64 A0~9-~05~000 : ~ MP'TR'~' -- :, ,. ::,. ....... SUMM'AR¥ NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO--COORDIN~TE-POINTS-WITHIN-'SPEC~FIED'-SEARCH-I~INDO~ ~v 31 ~' 32 33 :15 .... -- "37[ Closest ~pproach distance = 999~9~.0 ~eet KICK OFF For this run = O.O ~eet ;49! __iS2l MUD WEIGHT CALCULATIONS WELL P-13 (32-31-11-13~ Cement Calculations 10-3/4" CASING Measured Depth: Basis: Total Cement Vol: 7-5/8"CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 5-1/2" LINER Measured Depth: Basis: Total Cement Vol: 2680' 2 X Annular volume 1949 (cuft) 9130' 90% Annular Volume to 10-3/4" + 36 cuft 1281 (cuft) 1131 (cuft) 150 (cu ft) 9557' (Shoe) 1.5 X Annular volume to 7-5/8" shoe + 100 cu ft 153 (cuft) sal: 7/11/90 PUMI~ 18~ 66L I"I~JD PMI~P$ ro I'IUD r'i.~q ~ r o~ D 1 - Brandt Dual Tandem Shale Shaker 1 - Demco 6-12" Cone Shale Desander 1- Demco 416H w/16 cones & (1) Demco 4BH w/16 cones (Desilter) l 1 - Drilco Atmospheric Mud Degasser lc~Nr~ .. [,wu:os,aI $0 ~L D£~CO IZ 3 1- 200 gpm Operating Capacity. Centrifuge 15 - Brandt MA5 Mud Mix Agitators 1- 150 bbl. Trip T .ank 1 - Recording drilling fluid pit level indicator with both visual and audio warning devices at driller' s console 50 B~. So eel - Drilling fluid flow s.?~,~sor · with readout at drill%~.;s console CHECK LIST FOR NEW WELL PER, fITS IT--U~M APPROVE DATE (2' thru (3) Admin ~_°,('- (10 and 13) (14 :hru 22) (23 thru 28) Company Lease&YES Well NO i. Is the permit fee at=ached .......................................... ~ '~' 2. Is well to' be located in a defined pool ............................. 3 Is well located proper distance from property line .................. 4 is wei! located proper distance from other wei!s ........ ~ ........... " - 5 Is sufficient undedicated acreage available in this pool ............ 6 Is we!! :o be deviated and is we!lbore plat included ................. $ ' 7 Is operator the only affected party ......... i ........................ 8 Can permit be approved before fifteen-day wait ...................... 9. Does operator have a bond in force .................................. X 10. is a conservation order needed ...................................... ~- 11. Is administrative approval needed ................................... '"' ~ 12.' Is :he lease number appropriate ..................................... ~' 13. Does :he well have a unique name and number ......................... 14. Is c6nductor string provided ........................................ 15. Will surface casing protect al! zones reasonably expected to serve as an underground source of drinking water ..................... 16. Is enough cement used to circulate on conductor and surface ......... 17. Will cement tie in surface and intermediate or production strings ... 18. Will cement cover all kno~-a productive horizons ..................... 19. Will all casing give adequate safety in collapse, tension and burst.. 20. Is ~his well to be kicked off from an existing we!lbore ............. 21. Is old we!lbore abandomment procedure included on 10-403 ............ 22. Is adequate weilbore separation proposed ...................... '...... 23. Is a diver~er system required ....................................... 24. Is the drilling fluid program schematic and list of equipment adequate/~ 25. Are necessary diagrmms and descriptions of diverter and BOPE a~tached. 26. Does BOPE have sufficient pressure rating - Test :o ~OO¢~ psig .. 27. Does the choke manifold comply w/API P.P-53 (May 84) .................. : 28. Is the presence of HZS gas probable ............................. ~... 7/ 'IT9 th=d For exploratory amd Stratigraphic wells: 29. Are data presented on potential overpressure zones? ................. 30. Are seismic analysis data presented on shallow gas zones ............ 31. If an offshore loc., are survey results of seabed conditions presented 32. Additional requirements ............................................. /.- /. rev: 01/30/89 6.011. mzzzan UNZZ I o /orr POOL CLASS STATUS Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIXi ,. No special'effort has been made to chronologically organize this category of information. ,o PROGRAM: LISCAN REVISION: 5.2 PART NUMBER: W5790-MICRO Start of execution: Fri 14 SEP 90 2:31p **** REEL HEADER **** LIS 90/09/11 ATLAS 01 'LIS CUSTOMER FORMAT TAPE' RECEIVED gas Cons. Con] -p, s ~o~. Anchorage **** TAPE HEADER **** LIS 90/09/11 4579 01 'OPEN HOLE-BHC, ZDL/CN,DIFL & DEL2: 2773 - 9479 FT' FILE # 1 MAIN .001 **** FILE HEADER **** 1024 CN WN FN COUN STAT : BP EXPLORATION (ALASKA), : P- 13 (32-31-11-13) : PRUDHOE BAY : NORTH SLOPE : ALASKA * COMMENT RECORD * RUN NO.1 MAIN PASS * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 12 CURVES : NAME CODE SAMPLE# UNIT BYTES 1 GR 2 SPD 3 SP 4 CHT 5 CAL 6 TEMP 7 TTEN 8 AC 9 RFOC 10 RILD 11 CILD 12 RILM 68 68 68 68 68 68 68 68 68 68 68 68 API 4 F/MM 4 MV 4 LB 4 IN 4 DEGF 4 LB 4 US/F 4 OHMM 4 OHMM 4 MMHO 4 OHMM 4 * DATA RECORD DEPTH CAL RILD 9050.000 -999.2500 -999.2500 9000.000 0.9767001 1.435878 8950.000 1.438601 1.478573 8900.000 2.139501 1.377398 8850.000 2.104501 1.820267 8800.000 -0.2635999 1.158824 8750.000 1.781700 1.149963 8700.000 1.277301 1.827982 8650.000 3.821201 2.000044 8600.000 1.567400 (TYPE# GR TEMP CILD -999.2500 -999.2500 -999.2500 o) 0.0000000E+00 0.0000000E+00 696.4382 135.4573 161.5882 676.3279 127.9147 162.2181 726.0061 135.2729 162.3980 549.3701 132.3350 162.4358 862.9436 126.2171 162.4499 869.5930 106.8839 162.4658 547.0513 103.4790 162.1155 499.9890 99.39488 160.5664 994 BYTES * SPD TTEN RILM -999.2500 -999.2500 -999.2500 26.99730 3904.047 1.503251 33.99661 3943.079 1.562613 46.98941 3917.460 1.469513 53.59430 3870.928 2.049178 54.99451 3927.917 1.228996 53.99460 3885.847 1.212272 55.55251 3919.334 1.911138 54.62401 3864.300 2.032516 55.95871 3862.058 SP AC -999.2500 -999.2500 2.032606 110.7605 -8.216848 115.6212 -0.6846277 105.5780 -1.004560 110.3830 -3.310045 107.4372 -4.105205 112.4569 -5.028292 100.6341 -4.117806 93.04697 -4.785574 95.67105 CHT RFOC -999.2500 -999.2500 972.4224 1.980416 973.9072 2.421170 979.6731 1.995802 974.1838 2.384598 979.2446 1.659397 960.4189 1.752419 995.3416 2.480109 989.4590 2.817568 987.2434 2.547617 2.187395 457.1648 2.309664 8550.000 2.882301 2.279829 8500.000 1.738800 1.378313 8450.000 1.554100 1.267303 8400.000 1.788501 1.260982 8350.000 1.915000 1.255008 8300.000 1.673000 1.327197 8250.000 -2.362501 1.208097 8200.000 1.838300 1.425245 8150.000 2.125300 2.545233 8100.000 1.887100 2.475298 8050.000 2.037601 2.278409 8000.000 -0.1096000 1.032993 7950.000 0.1357000 0.9945951 7900.000 1.548100 0.8749388 7850.000 1.305100 90.55661 158.8915 438.6294 119.6001 157.3555 725.5244 120.9902 155.6614 789.0776 113.0475 154.1248 793.0330 114.2792 153.1263 796.8076 116.1250 152.7129 753.4678 108.6134 152.2969 827.7476 106.7854 151.7107 701.6335 81.62009 151.0333 392.8914 80.12190 149.8390 403.9917 86.54019 148.8350 438.9028 115.3562 147.8481 968.0605 109.9237 146.8720 1005.434 113.1379 145.7288 1142.937 106.5554 144.8567 54.58830 3808.725 2.451768 55.03020 3770.142 1.508195 54.99451 3792.397 1.378510 55.55251 3781.930 1.357420 54.99451 3722.208 1.346828 55.55251 3825.293 1.398617 55.00040 3688.858 1.320042 55.03020 3774.130 1.503775 56.99429 3673.514 2.723013 56.98840 3641.036 2.512891 56.99429 3639.786 2.342519 56.43631 3627.917 1.107027 56.99429 3603.060 1.066896 56.00031 3552.947 0.9652382 56.99429 3514.427 -8.897671 87.96634 -3.174368 105.5368 -3.403447 112.3361 -1.872652 111.0776 -1.304144 106.0118 -0.3218362 110.2769 -1.230455 109.6029 -2.161060 105.0192 -3.393211 90.37057 -4.329647 89.03957 -3.088456 89.65826 -2.499269 112.0202 -3.066897 113.0468 -2.966652 116.0553 -3.478478 115.9394 988.4854 2.868964 969.2527 1.951909 1029.728 1.823112 1031.373 1.830297 1041.100 1.952830 1058.450 1.876799 1042.364 1.792068 1081.993 1.945841 1026.272 2.857288 993.9385 2.792673 974.1262 2.440881 976.8474 1.454156 979.8865 1.443691 994.9905 1.261256 975.8223 1.273884 0.8967289 7800.000 1.246800 1.073480 7750.000 1.936901 1.247534 7700.000 2.265901 1.410116 7650.000 1.966101 1.050313 7600.000 3.320400 1.211838 7550.000 1.411600 1.445427 7500.000 1.989201 2.306057 7450.000 1.986601 1.495526 7400.000 1.332800 1.451483 7350.000 2.452002 2.439173 7300.000 1.757101 1.352259 7250.000 2.254001 2.321013 7200.000 1.962400 3.053742 7150.000 2.131999 2.198331 7100.000 2.096101 1115.164 108.9242 144.0844 931.5500 98.55376 143.3660 801.5818 105.9824 142.7137 709.1616 120.6112 141.9398 952.0972 112.8111 141.2481 825.1931 112.5200 140.5502 691.8369 97.78140 140.0473 433.6406 107.5437 138.8493 668.6609 107.5036 138.7464 688.9504 225.8151 138.5408 409.9751 190.8077 138.1135 739.5037 209.1128 137.7205 430.8462 246.8646 136.9533 327.4670 150.3444 136.3020 454.8906 129.0474 135.2890 0.9858823 56.95860 3486.845 1.152125 56.55240 3461.368 1.320250 56.98840 3426.114 1.508886 56.98840 3391.580 1.129552 56.98840 3405.375 1.304121 55.99442 3413.478 1.490902 39.00200 3310.501 2.350770 54.99451 3341.805 1.602325 55.99442 3279.342 1.520864 54.68401 3241.498 2.505218 39.99600 3241.390 1.489844 39.99600 3230.868 2.403227 39.99600 3173.055 3.059143 39.99600 3159.056 2.365887 39.99600 3135.292 -3.598769 111.8999 -5.391462 113.1066 -3.517492 117.3531 -2.794594 114.5959 -2.172894 106.3352 -2.363177 105.0983 -5.063978 93.93237 -5.016435 112.4855 -4.757795 110.7727 -4.116526 119.9229 -4.008274 121.9112 -4.436361 121.0750 -3.774340 113.5512 -3.467827 113.1466 -2.960672 108.7065 954.6694 1.467506 941.1655 1.630709 968.5945 1.871428 983.6335 1.484627 1012.609 1.686893 1055.704 1.823843 1051.486 2.468396 1061.822 1.931958 1031.246 1.994947 1036.550 3.345091 1043.157 2.131886 1039.025 3.055578 1018.371 4.442612 1033.528 3.731765 1036.403 3.605901 2.702813 369.9849 2.761493 7050.000 2.000000 1.930305 7000.000 2.531700 3.080909 6950.000 1.715600 1.336947 6900.000 2.027901 1.247416 6850.000 2.416902 1.496194 6800.000 1.473500 2.205361 6750.000 2.021801 1.916332 6700.000 3.242400 1.981585 6650.000 3.231900 2.455361 6600.000 2.896801 2.922283 6550.000 3.078901 3.392979 6500.000 2.568601 1.962861 6450.000 3.328201 1.371858 6400.000 1.313500 2.050432 6350.000 2.776701 159.0660 134.4166 518.0527 192.8676 133.7968 324.5796 189.2644 133.1057 747.9724 139.4827 132.4173 801.6567 175.2182 131.8782 668.3628 116.2141 131.3294 453.4404 105.9448 130.5979 521.8301 96.44420 130.0627 504.6467 90.40288 129.5843 407.2720 106.8002 129.0971 342.1982 94.12529 128.8139 294.7263 102.7050 128.3156 509.4604 88.75543 127.8189 728.9387 90.72290 127.2586 487.7021 97.02141 126.8621 39.99600 3110.920 2.040547 39.99600 3102.292 3.196933 39.99600 3061.668 1.508152 39.99600 3042.333 1.210437 41.75999 3011.132 1.576335 44.34061 2995.542 2.238049 43.99561 2961.596 1.941560 53.99460 2956.033 2.009287 53.99460 2942.074 2.537005 53.99460 2918.679 2.949800 53.75880 2881.146 3.362327 53.99460 2814.963 1.989079 53.99460 2843.687 1.391852 52.99471 2820.704 2.096807 53.99460 2802.853 -0.8381359E-02 113.6559 -10.10136 109.7668 -2.202052 108.7629 -0.3057687 110.1246 0.8643581 110.9827 -1.829866 99.26581 -0.6091706 98.85214 -0.5003224E-01 95.97252 0.3126984 91.76408 -0.2511371 91.78523 0.1859158 86.95607 2.135782 99.17024 1.666080 102.0890 3.433350 99.59088 3.500303 99.29134 1024.254 2.881043 1021.861 4.366687 1029.167 2.220266 1048.552 1.741854 1013.719 2.253938 1037.804 2.352027 1044.039 2.243857 1030.402 2.321943 1055.603 2.742166 1042.917 3.008643 1045.532 3.417423 1042.034 2.146825 1045.792 2.009909 1047.137 2.254175 1046.125 2.335255 2.115028 472.8069 2.178016 6300.000 3.572201 2.377735 6250.000 2.173801 1.805034 6200.000 1.367900 3.001685 6150.000 2.204201 6.285642 6100.000 1.685200 6.604027 6050.000 2.092200 3.088766 6000.000 0.6784003 4.320498 5950.000 2.013300 2.492067 5900.000 1.030300 3.710182 5850.000 1.975600 3.010417 5800.000 1.973300 3.629102 5750.000 2.000000 3.221954 5700.000 2.000000 3.002206 5650.000 1.212600 3.532652 5600.000 2.102100 89.88058 126.3456 420.5684 88.06210 125.8078 554.0063 98.93077 125.3295 333.1462 80.29280 124.8963 159.0927 77.98659 124.3964 151.4228 111.0386 123.9858 323.7539 101.1609 123.5078 231.4548 109.5414 123.0273 401.2732 101.1382 122.6776 269.5286 98.85902 122.1578 332.1799 93.51598 121.7149 275.5503 77.26781 121.3257 310.3706 95.28807 120.7726 333.0884 77.81641 120.4199 283.0735 81.79366 120.0193 53.64960 2801.661 2.397561 53.88541 2723.798 1.916571 53.99460 2764.234 2.990835 54.88530 2744.848 6.222505 54.99451 2736.974 6.086740 54.75870 2735.984 3.121639 55.64941 2712.563 4.178357 54.99451 2683.130 2.488692 54.99451 2660.346 3.701418 54.33960 2633.232 3.014864 54.75870 2640.278 3.614948 54.99451 2613.510 3.139434 54.99451 2598.440 2.911392 54.23039 2572.148 3.525026 54.99451 2557.859 4.631879 97.91357 -3.399287 103.3223 -5.070188 95.34297 -8.822226 89.91988 -9.663414 83.17212 -6.038014 97.57614 -8.095875 93.25679 -7.282585 98.47136 -8.497633 97.27574 -7.528294 100.4379 -8.395309 101.0320 -6.727497 96.77315 -7.089753 97.64554 -8.046185 103.0026 -11.34649 100.0422 1048.256 2.591152 1057.277 2.007599 1056.669 3.138447 1058.814 4.610094 1061.521 7.141415 1068.726 3.171221 1059.772 3.730949 1074.140 2.909872 1076.723 3.576465 1080.912 3. 045172 1080.189 3.500310 1075.630 3.764893 1093.120 3.265579 1095.211 3.282380 1095.539 2.998332 3.344812 298.9705 3.184012 5550.000 2.000000 4.556569 5500.000 2.989100 4.375974 5450.000 2.083900 2.969549 5400.000 1.362600 4.795966 5350.000 3.276100 3.199842 5300.000 2.302601 4.045132 5250.000 2.005600 3.164826 5200.000 2.196900 3.610277 5150.000 3.016001 1.553295 5100.000 1.701000 3.486082 5050.000 3.008701 1.610194 5000.000 2.018301 1.697869 4950.000 1.510400 1.729042 4900.000 0.9280001 2.369125 4850.000 1.325200 88.31250 119.6317 219.4633 62.97919 119.3305 228.5206 48.78902 118.7676 336.7515 61.90755 118.2534 208.5085 74.15102 117.6878 312.5154 90.17033 117.1977 247.2107 71.16273 116.8261 315.9731 70.42505 116.3311 276.9871 50.28371 115.8182 643.7925 107.0980 115.1531 286.8550 36.96053 114.7082 621.0432 55.77174 114.3588 588.9736 60.40503 113.8737 578.3550 55.03807 113.3852 422.0967 44.49699 112.9509 54.75870 2538.292 4.673414 54.75870 2538.469 4.464250 55.99442 2516.740 3.105718 55.99442 2483.273 5.092937 55.99442 2470.719 3.148273 55.99442 2459.778 3.955541 55.99442 2426.046 3.410508 55.99442 2437.472 3.312214 55.99442 2431.514 1.719505 55.99442 2407.196 3.626201 55.10370 2368.211 1.762588 56.10361 2355.708 1.847162 55.99442 2337.093 1.850346 55.99442 2347.728 2.576793 55.99442 2318.048 -17.73042 95.47719 -35.40860 101.3215 -39.99585 102.0220 -27.72353 89.78064 -7.036170 104.1818 -8.409719 103.4094 -15.83294 103.9295 -3.261415 111.2628 -52.95828 100.3897 -10.66593 113.9952 -51.33612 102.6715 -46.44623 104.2128 -40.99010 110.1227 -23.28857 108.9245 -35.88660 109.4662 1100.019 4.228312 1085.261 4.669533 1099.136 3.647948 1089.552 6.546993 1096.798 3.614916 1100.353 3.500639 1098.439 3.311700 1093.916 3.234406 1092.335 3.364906 1100.756 3.268451 1097.636 2.993817 1094.690 2.799734 1100.392 2.958804 1108.373 3.091657 1127.622 2.827956 1.906500 524.5215 2.095174 4800.000 1.603701 1.514070 4750.000 2.077801 2.379366 4700.000 1.002700 4.843081 4650.000 2.227100 2.669691 4600.000 2.059401 3.124946 4550.000 2.450901 4.504364 4500.000 1.433700 3.181050 4450.000 0.9087001 4.280266 4400.000 2.426601 6.053894 4350.000 1.748500 5.180017 4300.000 1.012400 4.266392 4250.000 2.349800 4.845819 4200.000 1.992701 4.269624 4150.000 2.177300 5.799030 4100.000 2.254001 32.80463 112.5231 660.4714 46.17952 112.1838 420.2800 67.88416 111.8128 206.4801 60.22421 111.5802 374.5752 81.35524 111.2035 320.0056 61.22993 110.8228 222.0069 58.31972 110.4760 314.3616 64.34880 110.0086 233.6303 62.24010 109.5998 165.1829 80.54602 109.2583 193.0496 91.51714 108.9100 234.3901 90.25337 108.5778 206.3634 97.20995 108.1786 234.2126 92.92981 107.7982 172.4426 76.23647 107.3573 55.99442 2325.135 1.689732 55.88521 2282.160 2.451903 57.64920 2256.000 4.663046 56.75850 2236.194 2.700129 56.99429 2224.053 3.244097 52.99471 2223.781 4.864145 51.64981 2191.269 3.119333 51.99481 2184.251 4.156438 52.33980 2169.117 5.800076 51.99481 2142.484 4.959670 54.23039 2122.868 4.299821 55.64941 2107.847 4.603114 54.99451 2087.714 3.970037 54.99451 2073.983 5.416553 53.99460 2069.894 -41.64500 105.4396 -23.92055 113.1939 -1.105650 103.8990 -16.90501 114.3092 -3.635357 106.9110 -7.040391 102.9406 -2.141234 115.6358 0.7727486E-01 108.8888 -0.4178258 118.2509 7.584413 117.4990 3.929134 128.3023 4.974235 112.7808 4.271881 126.4983 4.110536 115.9693 -5. 675138 120.8038 1117.320 2.613942 1128.366 3.098062 1140.635 4.412603 1130.736 2.992133 1136.277 3.405062 1136.731 4.530119 1140.681 3.376209 1146.396 4.429306 1131.535 5.639324 1134.387 4.484900 1146.699 4.035062 1148.526 4.322084 1154.446 3.848615 1155.578 5.338964 1162.120 5.687376 6.757443 147.9850 6.406365 4050.000 0.6025000 4.455969 4000.000 1.681101 4.194850 3950.000 2.540601 5.373670 3900.000 2.645101 5.604689 3850.000 1.935600 9.425110 3800.000 1.713100 2.433366 3750.000 1.580700 8.019400 3700.000 3.163900 8.416090 3650.000 1.241600 10.58990 3600.000 1.767900 10.55358 3550.000 2.085000 10.10539 3500.000 2.419201 11.00902 3450.000 2.431300 9.483910 3400.000 2.511600 11.07274 3350.000 1.674299 76.17180 106.9511 224.4181 50.52283 106.4827 238.3875 73.74632 106.0995 186.0926 82.96060 105.7236 178.4221 72.94101 105.3815 106.0995 90.09367 104.9443 410.9534 60.68202 104.2968 124.6976 73.86368 103.8310 118.8200 53.11234 103.1826 94.42960 48.51785 102.5749 94.75458 57.49870 102.0273 98.95709 60.37511 101.4125 90.83463 76.24570 101.0826 105.4417 73.59636 100.6876 90.31189 51.19476 100.1537 54.99451 2049.143 4.314453 54.99451 2023.331 4.390268 55.99442 2017.243 5.075326 55.23030 2004.827 5.218578 55.99442 1977.231 8.135942 55.99442 1976.128 2.446575 55.88521 1948.184 7.427481 55.99442 1928.881 7.765459 55.33951 1920.594 9.420454 55.99442 1897.053 9.262501 55.99442 1882.971 9.089209 55.33951 1847.531 9.501236 55.33951 1846.280 8.443726 55.33951 1823.594 9.690557 55.99442 1826.129 -5.075813 117.8822 -18.21747 107.5268 -2.508419 114.5010 6.520805 118.6877 6.337623 152.2269 3.466814 140.3285 -7.758922 123.5727 -1.508470 119.7476 -9.927559 120.7438 -4.182015 133.3676 -1.586611 129.1934 -8.579811 130.3465 -2.384869 121.5963 -0.8524753 124.0867 -5.071030 131.1422 1149.812 4.206327 1168.914 4.923950 1165.739 5.006120 1167.923 5.688325 1142.833 7.987523 1150.985 3.126333 1154.080 6.947703 1138.012 7.198793 1135.449 8.347467 1148.081 8.068321 1148.045 8.738838 1156.729 8.514063 1162.117 8.216896 1163.065 9.091862 1162.969 8.450056 12.46932 80.19681 10.57551 3300.000 3.313101 10.78673 72.83928 99.89543 92.70647 54.99451 1794.569 9.337242 -2.451774 121.7206 1168.130 9.095911 3250.000 2.386500 12.40131 67.91145 99.49364 80.63663 55.9944 1778.74 11.0145 -3.365664 118.9188 1168.696 9.888771 3200.000 2.497201 10.88465 79.92833 99.21135 91.87245 56.9942 1765.08 9.62868 -1.904201 124.5952 1159.329 9.238890 3150.000 2.343801 11.17079 74.52763 98.77043 89.51917 56.9942 1739.95 9.77292 -2.677694 127.4430 1157.183 8.379950 3100.000 2.515100 12.57363 63.86795 98.29245 79.53151 56.3394 1728.12 11.1819 -3.030738 125.5117 1168.961 9.354019 3050.000 2.762000 10.30687 68 97 97 .30716 .81065 .02266 57.23010 1707.295 9.196213 -3.824653 124.8313 1173.586 8.635630 3000.000 1.616000 9.403603 61.93581 97.52835 106.3422 56.99429 1703.109 7.571317 -5.340565 135.1101 1167.100 7.425345 2950.000 2.215000 10.83706 72 97 92 .19032 .19501 .27597 56.99429 1686.618 9.590092 -2.839271 126.3984 1173.069 8.397720 2900.000 1.445900 9.394176 89.35016 96.71426 106.4489 56.9942 1653.73 8.19152 -1.671791 133.4241 1160.644 7.972965 2850.000 1.591599 8.869408 75.09091 96.42075 112.7471 56.7585 1658.57 8.03220 -3.368434 130.3283 1161.270 7.492988 2800.000 3.441401 7.762936 60. 08180 95.91911 128.8172 56.99429 1635.886 7.135972 -17.45477 126.2809 1172.402 6.397738 2750.000 0.9670001 6.520771 75.08472 95.44127 153.3561 56.99429 1623.895 5.517637 -15.26355 128.7525 1174.865 5.884252 2700.000 3.862801 395.9036 49.37297 95.14200 2.525868 56.9942 1585.33 10000.0 -5.878342 78.40471 1180.227 0.3528720 2650.000 6.000000 0.2000000 51.15520 94.70123 0.0000000E+00 0.000000 1500.00 0.200000 OE+O0 0 0 -80.00000 50.00000 300.0000 0.2000000 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 677 9050.00 ENDING TAPE DEPTH = 2620.00 FILE # 2 MAIN .002 **** FILE HEADER **** 1024 * COMMENT RECORD * RUN NO.2 DIFL-AC MAIN PASS * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 12 CURVES : NAME CODE SAMPLE# UNIT 1 GR 68 1 API 2 SPD 68 1 F/MM 3 SP 68 1 MV 4 CHT 68 1 LB 5 CAL 68 1 IN 6 TEMP 68 1 DEGF 7 TTEN 68 1 LB 8 AC 68 1 US/F 9 RFOC 68 1 OHMM 10 RILD 68 1 OHMM 11 CILD 68 1 MMHO 12 RILM 68 1 OHM~ BYTES 4 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD (TYPE# 0) 994 BYTES * DEPTH GR SPD CAL TEMP TTEN RILD CILD RILM 9540.000 -999.2500 -999.2500 9490.000 6.000000 5.376754 -999.2500 -999.2500 -999.2500 0.0000000E+00 0.0000000E+00 185.9858 26.76517 181.1925 9440.000 1.593100 -999.2500 -999.2500 -999.2500 26.99730 4016.449 6.516924 29.99701 3984.618 SP AC -999.2500 -999.2500 -40.52881 70.39557 -50.95425 87.86951 CHT RFOC -999.2500 -999.2500 934.4001 7.975940 929.6895 3.130404 1.826612 547.4614 1.890033 9390.000 0.9781001 1.550128 9340.000 1.171200 1.690697 9290.000 1.493400 8.595266 9240.000 2.399600 14.92239 9190.000 1.930700 7.711156 9140.000 0.9946002 55.49004 9090.000 2.977000 8.968943 9040.000 2.182302 4.191928 24.84346 183.3089 645.1082 25.37450 184.5755 591.4722 32.02066 184.8870 116.3431 22.85757 184.2071 67.01340 35.49702 182.9120 129.6823 194.1129 181.2293 18.02126 114.5811 178.7009 111.4958 189.4688 176.6475 238.5537 8990.000 69.63339 2.021999 174.2354 0.2000000 0.0000000E+00 29.99701 4033.533 1.635951 -53.04637 91.10013 28.99710 -54.80179 3921.299 92.16100 1.713950 29.99701 -45.13208 3941.399 84.97426 8.238228 29.88780 -44.50880 3943.578 80.73138 14.62764 29.10631 -52.36063 4074.894 92.91591 9.568558 29.76120 -4.380912 4098.340 58.44252 46.73026 28.99710 -31.19872 4012.911 79.65060 8.654488 29.76120 -2.515837 3911.036 105.7778 2.708597 0.0000000E+00 -80.00000 2500.000 50.00000 0.2000000 1017.672 2.850385 898.1809 3.495749 900.0493 11.72551 904.6611 22.07755 1035.902 18.35593 1070.475 417.7104 1017.422 9.886478 937.3511 4.054600 300.0000 0.2000000 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 62 9540.00 ENDING TAPE DEPTH = 8960.00 FILE # 3 **** FILE HEADER **** MAIN .003 1024 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 20 CURVES : NAME 1 GR 2 CAL 3 SSD 4 SHR 5 RB 6 DEV 7 CHT 8 TTEN 9 SPD 10 SFT2 11 HRD 1 12 HRD2 13 LSN 14 SSN 15 CN 16 CNC 17 ZDEN 18 ZCOR 19 PE 20 PORZ CODE SAMPLE# UNIT BYTES 68 1 API 4 68 1 IN 4 68 1 CTS 4 68 1 CTS 4 68 1 DEG 4 68 1 DEG 4 68 1 LB 4 68 1 LB 4 68 1 F/FM 4 68 1 CTS 4 68 1 CTS 4 68 1 CTS 4 68 1 CTS 4 68 1 CTS 4 68 1 PCT 4 68 1 PCT 4 68 1 GMCC 4 68 1 GMCC 4 68 1 BARN 4 68 1 PCT 4 * DATA RECORD DEPTH RB SFT2 CN PORZ 9530.000 -999.2500 -999.2500 -999.2500 -999.2500 9480.000 -999.2500 1012.232 12.31177 11.01976 9430.000 -999.2500 1242.778 17.68855 17.10345 9380.000 -999.2500 1180.541 15.47067 15.46886 (TYPE# GR DEV HRD1 CNC -999.2500 -999.2500 -999.2500 -999.2500 0.0000000E+00 -999.2500 1191.028 17.13673 34.78940 -999.2500 1431.~413 22.67331 24.79105 -999.2500 1488.702 20.38554 0) 1014 BYTES * CAL CHT HRD2 ZDEN -999.2500 -999.2500 -999.2500 -999.2500 6.740626 -999.2500 1564.800 2.468174 6.843752 -999.2500 1765.041 2.367793 6.843752 -999.2500 1866.880 2.394764 SSD TTEN LSN ZCOR -999.2500 -999.2500 -999.2500 -999.2500 9742.555 4640.883 215.5177 0.5991545E-01 9857.973 4586.109 142.9284 0.2682425E-01 10498.95 4532.488 151.3569 0.7608116E-01 SHR SPD SSN PE -999.2500 -999.2500 -999.2500 -999.2500 0.6708268 23.99760 328.3643 2.076703 0.5929459 24.88831 256.9482 2.762147 0.6636840 24.10680 255.5552 2.132829 9330.000 32.46901 6.832850 10222.41 -999.2500 -999.2500 -999.2500 4313.754 1217.342 1523.602 1940.234 128.5875 18.93674 23.96326 2.344135 0.3947634E-01 18.53726 9280.000 27.67561 6.843752 10351.22 -999.2500 -999.2500 -999.2500 4485.754 1430.347 1666.622 2136.676 140.4906 17.27449 22.24577 2.284434 0.2316684E-01 22.15550 9230.000 33.71646 6.817558 10269.09 -999.2500 -999.2500 -999.2500 4452.926 1442.680 1652.627 2027.911 141.7837 16.89082 21.84981 2.301428 0.2512270E-01 21.12558 9180.000 220.3940 6.842999 8784.664 -999.2500 -999.2500 -999.2500 4619.098 797.4539 952.3584 1175.759 143.2497 16.95557 21.91661 2.559085 0.3336147E-01 5.510013 9130.000 499.3499 6.946877 8370.777 -999.2500 -999.2500 -999.2500 4669.016 570.0491 785.5828 1075.667 213.5969 11.73547 16.54524 2.612436 0.2541790E-01 2.276593 9080.000 100.8445 7.050000 8651.539 -999.2500 -999.2500 -999.2500 4594.539 715.8752 864.1248 1094.062 399.0393 5.132514 9.186985 2.606945 0.4327369E-01 2.609397 0.5573970 24.76170 238.8070 3.140071 0.6461700 24.23340 249.7507 2.275697 0.6366451 24.10680 249.3959 2.356704 0.6142390 24.99750 252.4284 2.557267 0.3973601 24.34261 318.7395 5.755012 0.5011021 24.99750 436.9407 3.853684 9030.000 88.58163 6.985352 4019.571 0.1991530 -999.2500 -999.2500 -999.2500 4446.570 23.99760 280.3901 461.7349 743.0076 41.71620 132.6789 58.44606 62.26352 2.242950 -0.5402014 14.13324 24.66968 8980.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 94 9530.00 ENDING TAPE DEPTH = 8970.00 FILE # 4 MAIN .004 **** FILE HEADER **** 1024 * COMMENT RECORD * MAIN PASS 4 ARM CALIPER * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT CURVES : NAME CODE SAMPLE# UNIT 1 C13 68 1 IN 2 C24 68 1 IN 3 GR 68 1 API 4 RB 68 1 DEG 5 DEV 68 1 DEG 6 TEMP 68 1 DEGF 7 CAL 68 1 IN 8 CHT 68 1 LBS 9 SPD 68 1 M/MN BYTES 4 4 4 4 4 4 4 4 4 * DATA RECORD DEPTH DEV (TYPE# C13 TEMP o) 1006 BYTES * C24 CAL GR CHT RB SPD 9520.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9470.000 354.8560 6.759667 0.0000000E+00 6.894719 6.827193 31. 8150~0 432.2444 5.365482 29.99701 9420.000 354.0730 6.766328 0.0000000E+00 6.841022 6.803675 22.74092 403.3059 5.637794 30.99690 9370.000 353.2007 6.918139 0.0000000E+00 6.902647 6.910393 62.65649 488.2620 6.215300 31.88760 9320.000 352.8455 6.799432 0.0000000E+00 6.765388 6.782410 24.68993 444.1909 6.425815 30.99690 9270.000 352.4573 6.832408 0.0000000E+00 6.903844 6.868126 27.39122 432.1526 6.818557 30.99690 9220.000 351. 6707 6.832408 6.947104 43.64330 7.391026 0.0000000E+00 6.889756 424.9844 30.99690 9170.000 351.5901 6.905149 7.099404 165.4906 7.259448 0.0000000E+00 7.002276 533.7358 30.99690 9120. 000 351.1746 6.905310 7.387248 428.2661 7.472754 0.0000000E+00 7.146279 563.1284 30.99690 9070.000 350.6255 6.934959 7.108272 60.46558 7.765101 0.0000000E+00 7.021616 514.1909 30.99690 9020.000 5.000000 0.0000000E+00 0.0000000E+00 5.000000 5.000000 0.0000000E+00 0.0000000E+00 0.0000000E+00 0.0000000E+00 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 41 9520.00 ENDING TAPE DEPTH = 9010.00 FILE # 5 MAIN .005 **** FILE HEADER **** 1024 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT CURVES : NAME 1 GR 68 2 SPD 68 3 TTEN 68 4 A2F 68 5 A2N 68 6 D2EC 68 7 P2HS 68 8 R2AT 68 9 R2SL 68 CODE SAMPLE# UNIT 1 API 1 F/MM 1 LB 1 DIM 1 DIM 1 DIM 1 DEG 1 OHMM 1 OHMM BYTES 4 4 4 4 4 4 4 4 4 * DATA RECORD DEPTH A2N (TYPE# GR D2EC 0) 1006 BYTES * SPD P2HS TTEN A2F R2AT R2 SL 9530.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9480.000 0.2890000 0.0000000E+00 10.48202 23.99760 64.23770 4640.883 0.5395762 0.1559375 9.403572 9430.000 0.2815000 34.78940 13.04382 24.88831 76.59109 4586.109 0.4236234 0.1192500 5.067457 9380.000 0.2820000 24.79105 13.52376 24.10680 79.67946 4532.488 0.3953899 0.1115000 4.420525 9330.000 0.2885000 32.46901 11.44151 24.76170 68.20844 4313.754 0.5047661 0.1456250 7.678559 9280.000 0.2935000 27.67561 13.06058 24.23340 72.26741 4485.754 0.5004257 0.1468750 7.124606 9230.000 0.2935000 33.71646 11.37793 24.10680 66.44366 4452.926 0.5417376 0.1590000 9.175730 9180.000 0.2515000 220.3940 15.41057 24.99750 89.20923 4619.098 0.3307655 0.8318752E-01 3.185890 9130.000 0.3070000 499.3499 17.88988 24.34261 81.53247 4669.016 0.5315554 0.1631875 7.162215 9080.000 0.2895000 100.8445 12.99042 24.99750 66.62015 4594.539 0.7040155 0.2038125 23.35275 9030.000 0.2243125 88.58163 5.567911 23.99760 165.8003 4446.570 0.1143750E-01 0.5098913E-01 0.5670298 8980.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 45 9530.00 ENDING TAPE DEPTH = 8970.00 FILE # 6 **** FILE HEADER **** REPEAT. 006 1024 * COMMENT RECORD * RUN NO.2 DIFL-AC REPEAT PASS FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 12 5 6 7 8 9 10 11 12 CURVES : NAME CODE SAMPLE# UNIT 1 GR 68 1 API 2 SPD 68 1 F/MM 3 SP 68 1 MV 4 CHT 68 1 LB CAL 68 1 IN TEMP 68 1 DEGF TTEN 68 1 LB AC 68 1 US/F RFOC 68 1 OHMM RILD 68 1 OHMM CILD 68 1 MMHO RILM 68 1 OHMM BYTES 4 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD DEPTH CAL RILD 9540.000 -999.2500 -999.2500 9490.000 6.000000 5.331361 9440.000 2.013200 1.817640 9390.000 1.472100 (TYPE# 0 ) GR TEMP CILD -999.2500 -999.2500 -999.2500 0.0000000E+00 0.0000000E+00 187.5694 24.91212 179.0217 550.1638 26.49486 179.9360 994 BYTES * SPD TTEN RILM -999.2500 -999.2500 -999.2500 35.99640 3952.877 6.530396 42.99571 3981.985 1.882579 28.99710 4024.508 SP AC -999.2500 -999.2500 -31.26459 70.33540 -37.39781 88.03476 -40.00969 91.03195 CHT RFOC -999.2500 -999.2500 835.9421 6.871500 868.3054 3.070545 921.8665 2.779179 1.551835 644.3984 1.634064 9340.000 2.583799 1.727689 9290.000 1.720700 8.559385 9240.000 1.366401 14.81825 9190. 000 1.713201 7.567123 9140.000 2.438400 57.52667 9090.000 3.034000 8.913252 9040.000 3.020700 3.551726 8990.000 1.987801 1.847753 8940.000 1.000000 1.864407 8890.000 1.271000 1.844376 8840.000 1.514000 0.2000000 8790.000 6.000000 0.2000000 24.57529 181.0311 578.8079 33.56133 181.2425 116.8308 20.48520 180.6892 67.48433 37.23695 179.5389 132.1506 204.4373 177.3070 17.38324 108.0779 174.1162 112.1925 184.7421 172.5825 281.5532 65.94829 171. 1450 541. 1980 98.12491 169.9503 536.3638 75.80922 168.7197 542.1890 87.40086 167.3560 0.0000000E+00 0.0000000E+00 0.0000000E+00 0.0000000E+00 28.99710 3920.586 1.698980 28.99710 3917.730 8.173738 28.99710 3913.510 14.47284 28.99710 4066.127 9.048307 28.99710 4028.965 46.55022 28.10640 4009.798 8.574602 28.99710 3885.610 2.565250 28.88791 3918.902 1.868082 28.99710 3893.383 1.871529 28.99710 3864.173 1.850888 0.0000000 2500.000 0.2000000 E+00 0.0000000E+00 2500.000 0.2000000 -36.72403 92. 31718 -24. 18915 84.93613 -30.09265 81.21106 -37.93654 92.85814 14.46780 58.66171 -22.76210 80.11655 7.764132 103.1694 -21.17151 55.09918 3.038253 54.05710 1.689944 54.05710 -80.00000 54.05710 -80.00000 50.00000 844.1873 3.413982 847.6648 11.45522 880.6345 21.70598 1010.051 17.71185 1040.268 365.4761 1012.019 10.10209 927.6985 4.038822 968.0459 2.264595 971.4043 2.271957 949.3516 2.273367 300.0000 0.2000000 300.0000 0.2000000 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 81 9540.00 FILE # 7 REPEAT. 007 **** FILE HEADER **** ENDING TAPE DEPTH = 8780.00 1024 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 20 CURVES : NAME CODE SAMPLE# 1 GR 68 1 2 CAL 68 1 3 SSD 68 1 4 SHR 68 1 5 RB 68 1 6 DEV 68 1 7 CHT 68 1 8 TTEN 68 1 9 SPD 68 1 10 SFT2 68 1 11 HRD1 68 1 12 HRD2 68 1 13 LSN 68 1 14 SSN 68 1 15 CN 68 1 16 CNC 68 1 17 ZDEN 68 1 18 ZCOR 68 1 19 PE 68 1 20 PORZ 68 1 UNIT BYTES API 4 IN 4 CTS 4 CTS 4 DEG 4 DEG 4 LB 4 LB 4 F/FM 4 CTS 4 CTS 4 CTS 4 CTS 4 CTS 4 PCT 4 PCT 4 GMCC 4 GMCC 4 BARN 4 PCT 4 * DATA RECORD (TYPE# 0 ) 1014 BYTES * DEPTH GR CAL SSD SHR RB DEV CHT TTEN SPD SFT2 HRD1 HRD2 LSN SSN CN CNC ZDEN ZCOR PE PORZ 9530.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 0.0000000E+00 -999.2500 1227.730 18.24014 9480.000 -999.2500 1029.881 13.38587 9.297024 -999.2500 -999.2500 -999.2500 -999.2500 6.584731 -999.2500 1487.484 2.496599 -999.2500 -999.2500 -999.2500 -999.2500 9906.070 4561.672 209.0172 0.8146828E-01 -999.2500 -999.2500 -999.2500 -999.2500 0.6458119 24.99750 330.4448 2.278699 9430.000 -999.2500 1267.982 17.87540 16.34802 9380.000 -999.2500 962.7263 15.62602 10.72777 9330.000 -999.2500 1103.817 19.59329 16.94583 9280.000 -999.2500 1410.391 19.55287 20.14186 9230.000 -999.2500 1477.350 17.64284 21.64925 9180.000 -999.2500 712.1980 14.06162 1.989161 9130.000 -999.2500 592.7388 7.360043 2.100829 9080.000 -999.2500 701.0557 4.679109 1.166979 9030.000 -999.2500 251.7908 64.20074 22.74059 8980.000 -999.2500 -999.2500 -999.2500 -999.2500 31.36760 -999.2500 1432.883 22.86629 31.73663 -999.2500 1247.160 20.54561 36.15550 -999.2500 1392.782 24.64249 28.41504 -999.2500 1619.240 24.60066 30.26958 -999.2500 1682.852 22.62610 182.0492 -999.2500 830.9971 18.93500 426.4500 -999.2500 791.9639 11.67170 98.32109 -999.2500 837.0164 8.684408 90.43677 -999.2500 444.3069 67.47098 -999.2500 -999.2500 -999.2500 -999.2500 6.776596 -999.2500 1766.681 2.380258 6.740998 -999.2500 1551.844 2.472992 6.740626 -999.2500 1741.767 2.370394 6.843752 -999.2500 2008.909 2.317659 6.843752 -999.2500 2068.557 2.292788 6.843752 -999.2500 1061.155 2.617179 6.877710 -999.2500 1076.935 2.615336 6.994128 -999.2500 1060.145 2.630745 6.946877 -999.2500 701.0381 2.274780 -999.2500 -999.2500 -999.2500 -999.2500 9990.621 4547.082 144.4683 0.3997601E-01 9897.824 4655.574 152.3594 0.7148898E-01 9736.023 4315.375 126.4763 0.2027809E-01 10326.25 4261.949 134.8937 0.3502149E-01 10332.87 4300.355 138.3226 0.2543515E-01 8521.867 4564.008 175.5112 0.3819586E-01 8421.566 4679.016 314.5928 0.3025867E-01 8651.516 4660.703 405.7073 0.5282106E-01 3998.688 3000.000 39.83571 -0.5310174 -999.2500 -999.2500 -999.2500 -999.2500 0.6392851 24.99750 261.0149 2.334008 0.6348039 25.99741 258.4392 2.372645 0.5847089 25.99741 238.7658 2.845498 0.6851590 25.99741 254.4032 1.967602 0.6759050 25.99741 248.3633 2.037525 0.5533990 25.96170 283.6816 3.185720 0.4194300 25.99741 389.5349 5.261894 0.5120970 25.99741 431.7874 3.701235 0.2287390 0.0000000E+00 131.8659 15.53320 -999.2500 -999.2500 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 94 9530.00 ENDING TAPE DEPTH = 8970.00 FILE # 8 REPEAT. 008 **** FILE HEADER **** 1024 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT CURVES : NAME 1 GR 68 2 SPD 68 3 TTEN 68 4 A2F 68 5 A2N 68 6 D2EC 68 7 P2HS 68 8 R2AT 68 9 R2SL 68 CODE SAMPLE# UNIT BYTES 1 API 4 1 F/MM 4 1 LB 4 1 DIM 4 1 DIM 4 1 DIM 4 1 DEG 4 1 OHMM 4 1 OHMM 4 * DATA RECORD DEPTH A2N (TYPE# 0) 1006 BYTES * GR SPD D2EC P2HS TTEN R2AT A2F R2SL 9530.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9480.000 0.3110000 0.0000000E+00 11.25008 24.99750 67.59076 4561.672 0.5078375 0.1579375 7.843607 9430.000 31.36760 24.99750 4547.082 0.1229375 0.2945000 13.45803 77.91469 0.4174448 4.875550 9380.000 31.73663 25.99741 4655.574 0.1207500 0.3055000 14.32594 81.35599 0.3952538 4.327433 9330.000 0.3040000 36.15550 11.25470 25.99741 66.35542 4315.375 0.5361842 0.1630000 8.973343 9280.000 0.3005000 28.41504 12.31386 25.99741 69.44377 4261.949 0.5245423 0.1576250 8.167843 9230.000 0.3065000 30.26958 12.28489 25.99741 68.91434 4300.355 0.5358891 0.1642500 8.629375 9180.000 0.3295000 182.0492 19.35953 25.96170 95.65063 4564.008 0.3380121 0.1113750 3.042690 9130.000 0.3100000 426.4500 16.87262 25.99741 77.47350 4679.016 0.5987903 0.1856250 10.25176 9080.000 0.2815000 98.32109 10.41927 25.99741 59.03162 4660.703 0.9236234 0.2600000 1000000. 9030.000 0.2135000 90.43677 -3.849196 0.0000000E+00 3000.000 0.1157812E-01 152.3881 0.5423009E-01 0.6308514 8980.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 45 9530.00 ENDING TAPE DEPTH = 8970.00 **** TAPE TRAILER **** LIS 90/09/11 4579 01 TOTAL RECORDS IN THIS LOGICAL TAPE : 1173 **** REEL TRAILER **** LIS 90/09/11 ATLAS 01 TOTAL RECORDS IN THIS LOGICAL REEL : 1174 TOTAL RECORDS IN THIS PHYSICAL REEL: 1174 End of execution: Fri 14 SEP 90 2:34p Elapsed execution time = 2 minutes, 36.4 seconds. SYSTEM RETURN CODE = 0