Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
190-118
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, March 5, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Josh Hunt P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC PWDW1-2A PRUDHOE BAY UNIT PWDW1-2A Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 03/05/2024 PWDW1-2A 50-029-22024-01-00 190-118-0 W SPT 3200 1901180 1500 898 898 898 898 87 179 173 171 4YRTST P Josh Hunt 1/26/2024 I met with Andrew Ogg and Scott with Little Red Services. They were pressure tested and ready when I arrived. Checked the gauges and paper work out. Good test. Down hole temp was 120 degrees and they heated the diesel to as close to that as possible but it ended up 130 degrees going in. Which I believe accounts for some of the initial pressure loss in the first 15 minutes. No issues to report. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT PWDW1- 2A Inspection Date: Tubing OA Packer Depth 220 1810 1724 1715IA 45 Min 60 Min Rel Insp Num: Insp Num:mitJDH240126094958 BBL Pumped:1.2 BBL Returned:1.1 Tuesday, March 5, 2024 Page 1 of 1 • 0 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission To Jim Regg DATE: Monday,January 25,2016 P.I.Supervisor k M b(((D SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. PWDW l-2A FROM: Johnnie Hill PRUDHOE BAY UNIT PWDW I-2A Petroleum Inspector Src: Inspector Reviewed B Li, P.I.Supry--J1-5C--- NON-CONFIDENTIAL JCNON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT PWDWI- API Well Number 50-029-22024-01-00 Inspector Name: Johnnie Hill 2A Permit Number: 190-118-0 Inspection Date: 1/16/2016 Insp Num: mitJWH160121121552 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 1-- PWDW1-2A , Type Inj W''TVD 3200 - Tubing 970 970 973 980 976 - 978 - PTD 1901180 Type Test SPT Test psi 1500 IA 39 2302 - 2270 2395 2418 - 2414 - 4YRTST P/F P ✓ Interval OA 5 8 7 8 8 8 Notes: 75 Min.-Tubing:980 Casing:2414 OA:7 Total test time was an 1.25 hours �iGAMIE� a y,; Monday,January 25,2016 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Friday, February 10, 2012 Jim Regg P.I. Supervisor '��� SUBJECT: Mechanical Integrity Tests ( BP EXPLORATION (ALASKA) INC PWDWI -2A FROM: Lou Grimaldi PRUDHOE BAY UNIT PWDW1-2A Petroleum Inspector Src: Inspector Reviewed B P.I. Supry , - NON- CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT PWDW 1 - 2A API Well Number: 50 029 - 22024 - 01 - 00 Inspector Name: Lou Grimaldi Insp Num: mitLG120204100407 Permit Number: 190 - 118 - Inspection Date: 2/4/2012 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well PWDWI-2A ' Type Inj. W ' TVD 3200 ' IA 170 2360 - 2320 2320 P.T.D 1901180 ' TypeTest SPT Test psi 1500 OA 10 10 15 15 , Interval 4YRTST ' P/F P ' Tubing I 1748 1728 1743 1805 Notes: 1.5 bbl's pumped, 1.6 bbl's returned. Good solid test. - ki € ;u'f Friday, February 10, 2012 Page 1 of 1 • • Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIlntegrityCoordinator ©bp.com] Sent: Wednesday, February 01, 2012 1:59 PM Z- To: Regg, James B (DOA); Brooks, Phoebe L (DOA) Cl ji Subject: January 2011 AOGCC MIT Forms Attachments: January 2011 MIT -IA Forms.zip; W -216 AOGCC Well File MIT - IA.pdf Jim, Phoebe, Please find attached January AOGCC MIT forms for the following wells: MPU B -12 (PTD #1850800) MPU J -11 (PTD #1941140) MPU J -15 (PTD #1991070) PBU L -105 (PTD #2020580) PBU X -24A (PTD #1991250) PBU NGI -11 (PTD #1770800) AOGCC witnessed MIT -IA performed 01/07/2012 to evaluate TxIA communication. Apply to 4 -year AOGCC test requirement to reset testing clock. PBU 11 -26 (PTD #1861340) Initial AOGCC witnessed MIT -IA performed 01/28/2012 post rig work over operation to repair TxIA communication and PC leak. PBU Z -102 (PTD #2070500) 4 -year AOGCC MIT -IA was due while well was secured for drilling operations on Z- 116. MIT -IA performed 01/28/2012 to put well in compliance to allow injection. The following two wells on your list do not have AOGCC witnessed MIT -IA's performed: PBU W -216 (PTD #2071680): Last AOGCC MIT -IA was performed 10/02/2008 for evaluating IAxOA communication witnessed by Mr. John Crisp. The MIT -IA form was submitted noting the interval as "0". BP will complete a 4 -year AOGCC witnessed test prior to 10/02/2012. I have attached the MIT -IA form pulled from the AOGCC website for reference. PBU P WW1 -2A PTD #1901180): Last 4 -year AOGCC MI - A was performed 01/04/2008. A non - witnessed MIT -IA was performed on 07/19/2009 at which time the test was incorrectly flagged as a witnessed test in our database. A witnessed test will be immediately scheduled (weather permitting) and the test data submitted to the AOGCC as soon as completed. Please call if you have any concerns or require further information. Thank you, FEB U 8 2,[J1Z Mehreen Vazir (Alternate: Gerald Murphy) Well Integrity Coordinator BP Alaska Drilling & Wells Well Integrity Office: 907.659.5102 Email: AKDCWeIIlntegrityCoordinator @BP.com 1 • • From: Regg, James B (DOA) [mailto:jim.reggftalaska.gov] Sent: Wednesday, February 01, 2012 11:01 AM To: AK, D &C Well Integrity Coordinator Subject: Past Due MITs Completed January review of MITs due; following tests are past due date per AOGCC records: MPU B -12 (PTD 1850800) Status= injecting (as of 12/31/11) MIT due 1/11/12 MPU J -11 (PTD 1941140) Status= injecting (as of 12/31/11) MIT due 1/11/12 MPU J -15 (PTD 1991070) Status= injecting (as of 12/31/11) MIT due 1/27/12 PBU L -105 (PTD 2020580) Status = injecting (as of 12/31/11) MIT due 1/18/12 PBU PWDW1 -2A (PTD 1901180) Status= injecting (as of 12/31/11) MIT due 1/4/12 PBU W -216 (PTD 2071680) Status= injecting (as of 12/31/11) MIT due 1/13/12 PBU X -24A (PTD 1991250) Status= injecting (as of 12/31/11) MIT due 1/22/12 If tested, please provide MIT Report; if not yet tested, provide reason for not completing tests on or before due date. Jim Regg AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907 - 793 -1236 2 MEMORANDUM • TO: Jim Regg ~' ~ J, , ~' ', ~~/ P.I. Supervisor ~ ~ ,t~~i` i ' f. ~ ; FROM: Lou Grimaldi Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday, January 04, 2008 SUBJECT: Mechanical Intea ~ity Tests BP EXPLORATION (.4L.4SK A) INC PWDWt-2A PRUDHOE BAY LMT PWDW 1-2A Src: Inspector NON-CONFIDENTIAL Reviewed By: ~„ P.I. Suprv,~k °/ Comm Well Name: PRUDHOE BAY UNIT PWDW1-2A Insp Num: mitLG080104131021 Rel Insp Num: API Well Number: 50-029-22024-01-00 Permit Number: 190-1 I8-0 Inspector Name: Lou Grimaldi Inspection Date: 1%4;2008 Packer Depth Pretest Initial IS Min. 30 Min. 45 Min. 60 Min. Well I, PwDwt- iTypeInj. I ~ TVD 3198 I .IA I 6s t64o i Isn I is~o P.T ~ t9otiso ITypeTest ~sPrl Testpsi~ t6ao ~~ OA '~ to ! to ~ to i to Interval aYRTST p~F P ~ Tubing j _ 400 ~ 400 ~ _ 400 ! 40o j NOteS' ~ I bbl pumped. Good test. Well on inteimittant injection. ~ ~t~ ,, ~~ 41AC~ ~ ~ ~~t~~ Friday, January 04, 2008 Page 1 of 1 MEMORANDUM State of Alaska Packer Alaska Oil and Gas Conservation Commission TO: Jim Rper ��� DATE: Thursday, January 30, 2020 / Z<1212 �a SUBJECT: Mechanical Integrity Tests P.I. Supervisor � I TVD 3200 - BE Exploration (Alaska) Inc. 7048 PWDW I -2A FROM: Jeff Jones PRUDHOE BAY UNIT PWDWI-2A Petroleum Inspector Test psi 1500 Ste: Inspector 179 Reviewed By: BBL Pumped:: P.I. Supry NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT PWDWI- API Well Number 50-029-22024-01-00 Inspector Name: Jeff Jones 2A Permit Number: 190-118-0 Inspection Date: 1/21/2020 .� Insp Num: miU1200129133832 Rel Insp Num: Thursday, January 30, 2020 Page 1 of 1 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well PWDWI-2A - Type Inj u' TVD 3200 - Tubing 7048 1045 - 104 1047 PTD 1901180 - Type Test SPT Test psi 1500 IA 179 T 2196 2144 - 2179 BBL Pumped:: '- 1 BBL Returned: La - OA 4 15' 16 16 Interval 4)RINI wl P ✓ Notes: I well inspected, no exceptions noted. Thursday, January 30, 2020 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg P .1. Supervisor ~4 i) Iii I o~' DA TE: January 4, 2004 SUBJECT: Mechanical Integrity Test BPX Flow Station 1 PWDW 1-2A PBU FROM: Chuck Scheve Petroleum Inspector NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. Well PWDW1-2A Type Inj. S TV.D. 3199 Tubing 1600 1600 1600 1600 Interval 4 P.T.D. 190-118 Type test P Test psi 800 Casing 650 1600 1550 1540 P/F P Notes: Well Type Inj. T.V.D. Tubing Interval P.TD. Type test Test psi Casing P/F Notes: Well Type Inj. TV.D. Tubing Interval P.TD. Type test Test psi Casing P/F Notes: Well Type Inj. TV.D. Tubing Interval P.TD. Type test Test psi Casing P/F Notes: Well Type Inj. TV.D. Tubing . Interval P.TD. Type test Test psi Casing P/F Notes: Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval 1= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover 0= Other (describe in notes) Test's Details I traveled to BPXs Flow Station 1 in the Prudhoe Bay Field and witnessed the routine 4 year MIT on well PWDW 1-2A. The pretest tubing and casing pressures were observed and found to be stable. The pressure test was then performed with the well demonstrating good mechanical integrity. M.I.T.'s performed: 1 Attachments: Number of Failures: Q Total Time during tests: 1 hour cc: f.[,r¡--¡ r~\:)'~ut=f;-:-~ J' r!.~i\~ ..;i;~ t",nrø \?)!~¿r~L~~t!~!!:tL ¡c! Ai ~ .1 ~.t LJ ,JJ MIT report form 5/12/00 L.G. MIT PBU PWDW 1-2A 1-4-04 CS.xls 1/6/2004 ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 January 11, 1999 Ms. Wendy Mahan Alaska Oil & Gas Conservation Commission 3301 Porcupine Drive Anchorage, Alaska 99501-3192 Re: PWDW Well Work Activity Dear Ms. Mahan: Attached is a well work history for each of the ARCO operated Prod~u~r Disposal Wells as you requested. If you require additional information or clar~lease contact Bill Mathews at (907) 263-4607. Sincerely, Injection Engineer Attachments RECEIVED ,]'A~ 1. 2. 1999 Alaska 011 & Gas Cons. Com[mssioJ, Anchorage ,SCANNED DEC 1 9 2002 ARCO Alaska, Inc, is a Subsidiary of AtlanticRIchfleldCompany PWDW2-1 Current plans Date 06/27/77 I O/O8/86 06/27/87 09/04/87 10/03/87 11/12/87 12/21/87 04/08/88 04/10/88 05/02/88 09/18/88 01/13/89 01/19/89 07/09/89 11/05/89 11/06/89 03/28/9O 03/30/90 06/27/91 07/18/91 01/24/94 O2/O9/94 03/17/95 03/17/95 12/04/96 08/10/97 are to drift and tag then re-run Temp Survey to confirm channel. Well Event Shot 90' of initial perforations (5867'-5897', 5945'-5955', 5963'-5983', 6297'-6327'). Passed state-witnessed MIT. Possible annular communication to 13-3/8". Ran a spinner survey. Indicated most of injection going to top perforations. Passed state-witnessed MIT. Rig workover to changeout tubing to 7". Ran a spinner survey. Indicated anomalies up: to 500' above perforations. SBHPS & TEMP - 2718 psi @6000'SS. Confirmed channel up from perforations. Added125' of perforations (5991'-5996', 6005'-6035', 6157'-6197', 6215'- 6245', 77-'6297'). Ran a spinner survey. Had problems due to debris in the well. SBHPS & TEMP - 2689 psi @5900'SS. Indicated a channel up to 5250'ELM. Ran a spinner survey. Indicated casing leak @ 5700'MD taking 35% of injection. SBHPS & TEMP - Indicated channel up; 2774 psi @ 6000'MD. SBHPS & TEMP - 2818 psi @ 6000'SS. Well passed 9-5/8" & 13-3/8" Iow pressure annUli tests. Well passed tubing, 9-5/8", & 13-3/8" high pressure annuli tests. Ran a spinner survey. Indicated possible liner leak above 5700'MD. TEMP -indicated channel top @ 5200'MD. Passed pre-state-witnessed MIT. Passed state-witnessed MIT. SBHPS & TEMP - 2939 psi @ 6022'MD. Indicated large temperature anomaly between 4800' and 4870'. Ran a spinner survey. Indicated 65% of injection going to leak in casing. Ran a spinner survey & TEMP. Channel up to 4500'. 72% of injection going to leak in casing. Well passed MITIA to 2000 psi. TEMP - not logged deep enough to pick up channel. Well passed MITIA to 1500 psi. ~CANNED DEC 1 9 200~ PWDW1-2A Well has been abandoned. Date O9/22/9O 09/24/90 11/28/90 04/06/91 04/24/91 07/1 2/93 08/06/93 08/10/97 Well Event Shot 32' of initial perforations (4784'-4796', 4862'-4882'). SBHPS-2141 psi @ 4666'SS. Added 99' of perforations (4934'-4952', 5062'-5086', 5138'-5158', 5166'- 5203') SBHPS & TEMP - 2258 psi @ 4666'SS. TEMP shows most of injection going to second and last sets of perforations. Ran a spinner survey. Indicates 100% of injection going to second set of perforations. Passed pre-state-witnessed 9-5/8" MIT to 1540 psi. Passed state-witnessed MITIA to 2400 psi. Passed MITIA to 1500 psi. RECEIVED JAN ~2 1999 ~aS~ Oil & Gas Cons. Anchorage ARCO ALASKA/-'~-iNC. - P,o~ Box ANCHORAGE, ALASKA . DATE: ~ 6-5-9~ REFERENCE' ARCO 3-3 5-i?;-9i TEMPERATURE . RUN t , ~'5" HR$ -* - 6-i .::.~. .... .-5-...-i6-~.i-. TUBING-CUTTER ................................. ~ ..... RUN -~ ,'~JS~ ...... ' ....... A,TLA~ ** i 2-8B ~i~-~5~21 ~9i- CALIPER.~.LOG. i.: :, ~...~m. ~''T:~ ' '~' 'i??RUN t'75'. &t Q'.. ~CH ..... OWDW-NW~-'5=2=~ ............. F'I T~-~.C~~ ....... ~ ........... ' RUN--.~ .,.~L5 % .~'~:~-~. ....... CAMCO :'OWDW-~E 5'.~9t ' F ~:~;~Y"';'-~: : - -- ' ""' CAMCO PWDWt 4'24,~t INJECTION.-.?ROFILE .--.'--,- -" ' -.- RUN ~ ~ '~ ''.' I ' :'I '' ' : --' I > ~ ' CAMCO ''tl6 Z SCTZO ........................... . .... ' - -. '.~t..L ..~ '- - . ' ' : ,.[ '; '-. - -PLEA~E-.~IGN--.AND.~ETURN-THE.LATCTACHED COPY A~ RECEIPT OF ---BAI:A.~;~; ;. .-- ' .............. - -" ......,,~.~-:~ - 4L.~<,, -~ k?~¢', - - -.' - ,- ,:. ~>~ ~:- ~*~, ~,,,~¢ ~'. ....... , .- -: ......... .~>¢~;~V-?.... ' ' ... ' ....... ' '.~;.¢. :: ':. - ' x'.*_,<(~-'~f.:-,-s~~;.--- ...... . . · ' ~."-~%~'~!Z4 ~t,¢~k¢.-[%~?.~ ". -- - .'-~ .- ',.~: · ." - -.'" '. ...... .,;.x;~. ,>-:~'~;?A,'-, ..."'?., ." '. , ' ....... ~ .... - -.?---,,-,,~:~'~-,i-~ .....· . ~ · - -~:-**, ....... ¢,,~.,, ......· "- ,~-, ......,' -..¢.- ,. .... ,-.-,~,¢~(: ...... '. ' ..... .... ,'...L. .. . "- ~- -.' ,.~,_?.-.~;:'..5¢4.~-~.~?:~<~;.,:,.. ,,.;-~;;~%; /~?T,,~' ~. . - , .... '-.'.' .. ' . ~.-.: .:,-h" *,..*¢~'~;7~~ - . .., ,,. HAVE .A. N .... ..... ..... .... .., '. .: .. - ', _ :', ."~-':~?~? ..... '--.- '.,;¢'*~,~~t*?:..',-.'..: ' ..:' - ,'?.,--.:.,,'.~.r. ' .... :-...¢'~ ~~4"-..,.------.-:' ............ : ;. "-,-_' ":'~n-:t ~2g~~~,:;'..~-~ '~- -'. .... "." :.:~';;, -.~,**,~ 'o~~'~.:'.-.. ,. .-,.",:, :,.,' . ................... ,.. ~. -.~4 ~. ~,~ ....................... ~d .....,,..=.~_ .. ,....~ .......................... ~; . ,,..,,. . :. .~ ...:..-.... . ,.> .,..~_--- :~-.~:~?~;:.~.~.-.. .-:-., .~ :-.-:~;;:.<~:,~..~.-?~,<,~.-~: . . .:..:¢.. , -- . . .~........ :. ...,-..,~:,~,~,,~-, ..,~:..-... - .,.;, .'~ .'.-~.' -:-~.~.-'~¢r:~:,;¢-."¢'.. -- ..... . -'.-_.-' 'zz~'~..:?~:~'~'~?¢:~;¢-;~-'~'.-'.' '..' '..:- ·" . .. . . ' ~ . , - ¢ , .., .~ ~,~ ~.; ' . - · ;-.-- ' ~:,¢;~=}.,.:.;~. '- :'.?-;',-:5~-:~, ¢* .,~,~';-;:*. ~-.;' "~-' ; .:--.-,-~-..-.-,. '..,--. .... .: . .. :.. *'-_ -x'. - ..' "'..,~,~?:?~ ~?.;,'-'.,, ,- , · '"~,- ~~~z,' .... D I~R~.I BU.Zt. ON ...... -' .,.~....~; ............. :_:-. · ' ',' '"" ..... ... --~ ........... ::?~:.;-,~.? ,.-~?~: ......... _ ........... ~-.., _ ,~.~.,.% ,= .~~..,.. ....................... ~:._.-.-. ,. ¢.' ~;~.¢.::?~.~?,?~;~?~', ,v,~., . ..... :..; ,,.s:~s~,.~-~S-',~-..;<-~¢~;~.-.,..:-,-:~ .. ; ,~,~..- ~ .... ... ..,¢S.~,¢., :, ~,~¢.~'.,.,...~;.~..s,..'¢~. ;~.... . . - ¢ ~ :-'..'.. -':.-. :-:;~-:.,-~.¢~,~.: - ..... : '- ',- · ....-..-,~~:~(_.:~:s~.~:.-r~ · -. :..,. . ' .' - 3~,~; ...... : ~ -~ .... ~-,~. ....: ' .... '.. ,'--' .:' : ,: ./-'-~.%,:'~?-¢*-~L~'?--~ .--~¢~ - .¢::-.;: ':¢ ~;~.-~L~'~;'%_.'.,¢,'...'>..,.;;",;r~..'~,:r .:~, -.~ '~ . -' - ',., ?-.' .'-.-?.~ -:x.:~';.~4¥:¢.:.%-.' '. > .- . '.'~ "~'E'X~T'ENZZON EXPLORATION ,'- ~ BPX · - - ,'-., . ...... ~ ................... ~-.~-~% 0 N ................. ..-*:~~.4-.-.~ ............ ~ ....2,-~TATE.- OF ..A LA ~ K A ...... -~..~,~ ¢....... ....................... .-: -.:,.:~? :., TEXACO ~;... : ' ~ . . -.': ~..-_ . . ' ' - -, '-..-" .-- ~.~,.L,~.~:~-,, -.~- ' ' ,'.-. -.}?~ ¢- - _.-.-' . .. ~ . ', " :'..'¢-, ;.~¢;;~¢;~3~',¢'-:-~ '- · *"¢.~.~:2;" ;',::.: ..- :. ' ' - ".~:'_' ;-' · ** THE. CORRECTED ~F'Z~ FOR':t'2-8~ ~Z 5e-e2~-2e432-e~. ~ ~':,~:'--" ~ . .. ..., . ..................... ~. '.,~.~ ;. ................ .¢ :'¢-'~ ~ . - ..... · ............................................ ~ - . '- -, ' -.~ ...~ .... 1 _.. ~-. -, ~... , . ... - · · ~- - ~:Y.--'~:~-;7-. _ - ~-".: ~..' -' · .,.-. ~'_:.. ' '" '-'-""'-'- ' ' - ' JUN ~ '~¢" ' ........................ - ..... .. ....................................... .]. u .....:~ ~, .............. - ......... ._ Oil-& Ga..~-6~...'gommi~ion Anchorage'.. .." ARCO AI...A.:'~'KA, IN[.'.,, ' .... F:'., 0,~ Ii': 0 X i 0 (i:' 3 6 0 ' A N C: H "/,,c' A (; E, A I... A S' I< A ':?, 9 ..;'::' i (:) i 7 .... i 4 -. 3- 9 i i... Iii: A I< i) Iii: i" [.:. C: 'T' I (:.1 i'./ ! N ,J I.-':'. C: T :[ O N C: B 'T' F' I";: O D U C '1" :1: O N F:' R O D LI .r..': 1" I O N I... !ii: A I'-'.'. P ii.'-. 1" Ii': C:, T' I O N I... E A i< I) Iii; T' Iii: C T' .1; 0 N C: O I... I... A F;.: / F:' Ii': I";: F"' [.; A H H A/' C C I.../' ,..t Iii: !,4 Iii: L.. R Y' I... E.:. A K D Ii/. T' Ii"' C: T' I O i"',! !... !ii: A K .b !ii: '1" E. C 'I I 0 i'..! F:' I T' S / I N J E C: T' I O N I b.J. J Iii: C 1' ]: O I N ,.J Iii: C ff' I O N t:;' R 0 D U C i' ]: 0 N C': 0 L I.. A F;..' I::' F;.: 0 L." LJ C '1" I O H T' E H F'/,":? F:' t i'"J, N E I;: F:' L E A 3 E ,::..: I ['; N A N D F;:F.i: i" U !:;.: N 'T' H E A '1"'1" A C H E D r.: O P Y A,S: Fi: E C F' I F' 'i" 0 F:' D A i"A, I.-IAVE A HIC:[." DAY! ,'.'.;' H/", F;.: 0 i'-..! I..,J I I... ,S' 0 i'.! A'I" O .... i D";2 9 D I/:.; T F;.: I B U i' I O N :Il: C: I:".-: N T I'?. A !... F:' I L E $ · 'Il: C I..I Iii: V i:;: O i'4. D & i"'i :,'J:F.'i: X' '1" E i'.-] E~ Z 0 i",! E. × I::' I... O R A ]" I Ct i".! · ,.'"' E X X O N i"i A R A T H 0 N · ,,.'"' H 0 B I 1.. C A i"i C O C A hi C O C A Pi C O C A H C: O ,.? C I.-I C A H C O C n Pi C 0 C A i'! C O C A f'i C [? F-.', T' I... A ,? C A Pi C 0 C: A ri C 0 C A iq C' 0 C A/"i C: O C A i'i C O C A N C: 0 C A iq C O C A M C O C A H C O · x.. i"l-.I I S I S A D L.I P L. I C A '1" E O t:-" T I..IE:' L.C.) (; Y O L.! A I.. R Iii; A D Y R E C E I V EL D, E. X C E P T T I-.I E A F:' I I.S' COF;.:F<F-'CTED, F' L. [.E A,'.,; I?' TI--It-i:OW T'HE F'REVIOLIS' COPY WIi'H 'I"i-.ii_-'F. WI:,,'ON(; APl:If' AWAY, ARC(] mLA~.KA ][NC P~ 0 · BOX ANCHORAF~E, ALASKA 99.b~ i 0 DATE · i '2--5-9¢, REFI-ZRF'NCE' ARCO L.~.~,".,.:.D HOt_.E F-'INALS 5-:'25 I i--4--9,':i) F'ROD PROFILE RUN i , :~-26 ~0--.S~-9;5 F'ROD PROF.[L.E RUN i, -~-.o i i '-") ' ~o-'-7',2' ['::[]L.I_AR/PEF~F I:;:LJNi , 6-i C' i i -2'.':-'-9~3 F'DK-i 'S"::.;,/t;R/CCI_ RUN i , 6-2.5, i i -26-9,S, F'I)K- i ':9~]/GR/CCL RUi'.! i , 7'-9 i i-:'?,-9':":, F'IT'S/SF'.[NNER RUr...!i , ~-.,._'_o i i-':~a.-c,,':; COI_.L. AR/F'ERF' I:kUN i , t i-4 t i .-4-9,.'~, F'I:;:OD F'ROF:'iL.E NUN 1., i i-5 i i-3--9('., F'ROD PROF]:I._E. F..'LJNi , i i---i t i i--3-':.:-',:~':F'I-i'.OD F'RUFiLI:-' RUN 1 , i S -- 6 i ;:;., -- .:,""' i - ':;", ;':,... N ]: Z';' C G A 5' I N...I I::'R 0 F' I L. [':. R U N ..':'., i 4 - ~, '5 '~, i -....,'= -- ':::', ::',.. ~:', ~:;",. 0 .,,[':, F"R 0 F' i I_ E F;..' I.j N i , i ':J.': - 4 i i '- 2 :.~-- 9 C, V E: R'i" ]: L 0 G R U i"'~ i., i 6-i 9 i ':'}-"-:.5i -9,?COi_LAF;: RUN i , i ",:: '- '? i i --,~. '''~ - ~::'',. ,':'".:. F:' ,.~:;'.. Fi_ .,",", PR 0 F '~'.,. L E F.:. U N i , i '?.-.-9 i i -:3 .... 9':'} F'F<OD F'i:;:OF:!L..I~'. RUN i , i '?- t i i '~ -- ''~ - o,.':; F' 1:;,' ri D F' F;.'. 0 F l L E. R U i".! 2 'i 7-i..-..'-' i i--:3-9,:'} F'ROD F'F.:OFILE F;,'UNi , F' W D W i - 2 A i i - f-:' ,'-:-i - ':;-' ;:; C: 0 L. L. A R ,'" F' E R F' F;..' U i"-~ i , c~' u ~',,' u 5" 5" ,,,~,, 5:" .~. ..j. 5" ..,,,-' ,~::'~,..iF:A,SE 5:i(]-N A;"-~D,.. F;.:ETLJF;..'N '"-i-~'::',,,, ...... AT'i-AC:FiiFLD F:l'!j:;'? AS F.,'iZCi!!:.[F:"F Oi::', DAi"A,. R Iii: C E: ]: V F:: D B Y HAVE A NITM I. .... DAY! SAL. I_Y HOF"FECI< ER A ]" O. - i _; ,_-. ':~ '-' ~;:', C A ri C 0 C' ~, ri C 0 ~::~ Fi_A:!/ A 'f' L. F~ ~' ... H ~"; !..; 0 A'F L_ A ,? U A ri C 0 i:; A M C 0 C~ M C 0 C A M C 0 C: A M C 0 A i'i_..A S C A 7i C .'..] C A M C 0 C A M C 0 t.,~, CO A ¥' L. A .S' D I S T R :1: B U l' ]: 0 N PHILLIF'S PB WELL F:I[.lii. R & D BF'X S,'-I"Ai E I]F ALA;~'K TEXACO RECEIVED DF_C 7 1990 Alaska 0~1 & Gas CsnS. COlilflliSSlOi'i Anchorage STATE OF ALASKA ~'~ O R I G IN AL/ .,A OIL AND GAS CONSERVATION COrv,,,-.~'SSION WELL COMPEETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well PRODUCED WATER DISPOSAL WELL OIL F-~ GAS r'~ SUSPENDED r'~ ABANDONED r-] SERVICE r~ 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 90-118 3 Address 8 APl Number ~ ........................... 50-029-22024-01 P.O. Box 100360, Anchorage, AK 99510-0360 4 Location of well at surfacea;; '~?~T~!, i 'I'(~'~'TI~i~ 9 Unit or Lease Name 761' FSL, 252' FWL, SEC 31, T11N, R15E UM i _~,~.~.¢::,~_ '. i V'E~.~. 10 WeIIPRUDHOE BAY UNITNumber At Top Producing Interval 796' FSL, 63' FWL, SEC 36, T11N, R14E UM ~~--~-1 l r;. H ~ PWDW1-2A At Total Depth 11 Field and Pool 820'FSL, 377"FEL, SEc 36, T11N, R14E UM CRETACEOUS POOL/UNDEFINED 5 Elevation in feet (indicate KB, DF, etc.) 6 Lease Designation and Serial No. RKB 60' ADL 28326 (SILL)/28306 (BHL) 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. I 15 Water Depth, if offshore 116 No. of Completions 08/31/90. 09/01/90. 09/20/90*[ N/A feet M SL[ 1 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of permafrost 5360' MD/5214'TVD 5252' MD/5121'TVD YES ~ NO r-] 2015, feet MD 1900" (approx) 22 Type Electric or Other Logs Run CET/OBT/GR, GOT 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5¢ H-40 SURF 112" 30" 2850¢ POLESET 13-3/8" 68.0¢ K-55/L-80 SURF 3467" 17-1/2" 2000 SX CS III 8, 600 SX CLASS G TOP JOB W/250 SX CS II 9-5/8" 47.0# L-80 SURF 5332' 12-1/4" 575 SX CLASS G & 300 SX CLASS G (ARCTIC PACK) 24 Perforations open to Production (MD+TVD of Top and Bottom and i25 TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7" / 5-1/2" 3269' 3190' 4784'-4796'MD/4714'-4724'TVD W/4 SPF 4862'-4882'MD/4783'-4800'TVD W/4 SPF 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED N/A 27 N/A PRODUCTION TEST ::)ate First Production IMethod of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO I TEST PERIOD ,,~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATI: 28 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE *NOTE: DRILLED & TUBING RUN 9/8/90. PERFORATED WELL 9/20/90. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE ' ilaska Oil & Gas Cons. Anch0ra.qe ;":" 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. T-5 3504' 3504' T-3 4133' 4122' UGNU SANDS 4720' 4657' NONE 31, LIST OF ATTACHMENTS WELL HISTORY~ ADDENDUM (SIGNED 10/19/90), AND GYROSCOPIC SURVEY (2 COPIES) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~f, ~t~) ./~./~,.~ ~..Z~I'~ Title DRILLING ANALYST Date / INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion repod and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pedinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Oil anu Gas Company Well History - Initial Report - Daily Instructions: Prepare and submit the "Initial Roi)orr" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summerized on the form giving inclusive dates only. District Field ARCO ALASKA INC. ICounty, parish or borough NORTH SLOPE [aase or unit ADL: 28326 SHL/28308 BHL T,tle DRILL & COMPLETE State AK FHell no, PRUDHOE BAY 1-2A Auth. or W,O. no. AS3889 API: 50-029-22024-01 Operator ARCO Spudded or W.O. begun SPUD Date and depth as of 8:00 a.m. 08/30/90 ( TD: 3474'( SUPV:GTG 08/31/90 ( TD: 3625'( SUPV:GTG IDate 08/29/90 JHour Complete record for each day re~orted NABORS 2ES 18:00 IARCO W I 22. 0000 Prior status if a W.O, 1) 3474) 2) 151) WORKING 13-3/8" SWAGE/MILL13-3/8"@ 3467' MW: 8.8 VIS: 38 ACCEPT RIG @ 1800 HRS 8/29/90 TO BEGIN THE PWDW 1-2A SIDETRACK. M/U BHA #1, 1 DEG BH MOTOR BHA. FUNCTION TEST MWD. RIH, TAG TIGHT SPOT IN 13-3/8" CSG AT 3347', COULD NOT GET THROUGH. POOH. RIH W/ TAPER MILL & CASING SWAGE BHA. TAGGED UP @ 3309', WORK MILL / SWAGE THRU TIGHT SPOT. DAILY:S53,800 CUM:$53,800 ETD:SO EFC:$1,266,800 DRILLING 13-3/8"@ 3467' MW: 8.8 VIS: 42 WORK MILL / SWEDGE THRU 13-3/8" TIGHT SPOTS. POOH, MILL 70% WORN. RIH W/ NEW MILL / SWEDGE. WORK THRU TIGHT SPOTS @ 411', 724', 3355'-3409'. CIRC & COND. POOH. RIH W/ 1DEG BH MOTOR ASSEMBLY. DRILL F/ 3474'-3625', KICKING OFF WELL 09/01/90 ( TD: 4654'( SUPV:GTG 09/02/90 ( 3) .029) DAILY:S36,688 CUM:$90,-488 ETD:S36,688 EFC:$1,266,800 DRILLING DRILL TO 3903' 4177' CBU. DAILY:S40,516 CIRC ON CHOKE 13-3/8"@ 3467' MW: 9.2 VIS: 38 C&C. SHORT TRIP TO CSG SHOE. DRILL TO DRILL TO 4654'. CUM:$131,004 ETD:S131,004 EFC:$1,213,000 13-3/8"@ 3467' MW:10.1 VIS: 41 TD: 5360'( SUPV:GTG 09/03/90 ( TD: 5360'( SUPV:GTG/DJ 09/04/90 ( TD: 5360'( SUPV:GTG/DJ 706) 5) 0) 6) 0) DRILL TO TD @ 5360'. WELL FLOWING, SHUT IN, SIDP=125, SICP=80, 7 BBL GAIN. RAISE MW TO 10.2 PPG. CIRC THRU CHOKE, LOST 90% RTNS WHEN 10.2 PPG REACHED SURF. MUD VERY THICK, CHECK WELL, WELL STABLE. POOH FOR SHORT TRIP AND TO STAGE OUT THICK MUD. PULLED 5 STDS, PROPER FILL UP, PULLED 4 STDS, HOLE SWABBING. RIH 6 STDS, WELL STARTED TO FLOW. SHUT IN, SIDP=40, SICP=85. CIRC 10.1 PPG MUD THRU CHOKE, LOSING 20-48 BBLS/HR. DAILY:S63,358 CUM:$194,362 ETD:S194,362 EFC:$1,213,000 RIH 13-3/8"@ 3467' MW:10.6 VIS: 47 CIRC THRU CHOKE W/ 10.1 PPG MUD. SHUT IN TO BUILD MUD VOL. RESUME KILL, SIDP=30, SICP=80 PSI. RAISE MW TO 10.6 PPG, FLUID LOSS DID NOT INCREASE. WELL DEAD. CIRC 10.6 PPG W/ WELL OPEN. C&C. POOH SLOW, WELL STABLE. L/D MWD & MOTOR. RIH W/ WIPER ASSEMBLY. DAILY:S80,026 CUM:$274,388 ETD:S274,388 EFC:$1,213,000 RUNNING 9-5/8" CSG 13-3/8"@ 3467' MW:10.6 VIS: 45 RIH TO 5264', WASH & REAM TO 5355', LOSS RATE 2-3 BPM @ 8.5 BPM. C&C MUD. SPOT 55 BBL LCM PILL. SHORT TRIP TO CSG, RIH. C&C MUD, LOSING 1/2-3/4 BPM. SPOT 55 BBL LCM PILL. POOH. L/D BHA, CHANGE TOP RAMS TO CSG RAMS & TEST TO 2500 PSI. R/U CSG TOOLS. RNG 9-5/8", 47#, L-80, BTC CSG, (60) JTS IN HOLE. DAILY:S40,566 CUM:$314,954 ETD:S274,388 EFC:$1,253,566 The above is correct For form preparation and distribution, see Procedures Manual, Section 10, Drilling. Pages 86 and 87. Title RECEIVED AR3B-459-1-D NOV ! 5 ]990 Number all da[llJ~v_ell.hlstoG, forms consecutively jPage no. aa they are ""~e~'0tl'a"Gas Cons. C0mmiss 0r Anch0racja ARCO Oil ana Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all-drill stem tests sequentially. Attach description of all cores. Work performed Dy Producing Section will be reported on "Interim" sheets unlil final completion. Report official or representative test on "Final" form. 1) Submit "lnlerim" sheets when filled out but not less frequently than every 30 days, or (2} on Wednesday of the week in which oit string is set. Submit weekly for workovers and following setting of oil string until completion. County or Parish IStale NORTH SLOPE AK Lease or Unit PWDW 1-2A SIDETRACK IWeU no. I District Field ARCO ALASKA INC. PRUDHOE BAY Date and depth as of 8:00 a.m. 09/05/90 TD: 5360' SUPV:GTG/I 09/06/90 TD: 5360 PB: 5250 SUPV:HMP 09/07/90 TD: 5360 PB: 5252 SUPV:HMP 09/08/90 TD: 5360 PB: 5252 SUPV:HMP Complet ...... d f ..... I~,ld~ dr~Jl~l~ ..... k ....in prog .... 7) 0) 8) 10) CIRC 13-3/8 X 9-5/8 ANNULUS 9-5/8"@ 5332' MW:10.6 VIS: 41 FIN RNG 132 JTS 9-5/8", 47#, L-80, BTC CSG TO 5332' CIRC & COND WHILE RECIPROCATING PIPE. BATCH MIXED 120 BBLS (575 SX) CL 'G' W/ ADDITIVES @ 15.8 PPG. PUMP 25 BBLS ARCO SPACER @ 8.3 PPG. PUMP CMT. DISPLACED CMT W/ MUD. DID NOT BUMP PLUG, 75% RETURNS DURING JOB. INJECT 100 BBLS DOWN 13-3/8" X 9-5/8" ANNULUS. RIH W/ RTTS & "FO" FINGERS. OPEN LOWER "FO" @ 3076' & SET RTTS @ 3045'. EST INJ RATE OF 3 BPM @ 175 PSI. MIX & PUMP 56 BBLS (300 SX) CL 'G' CMT W/ CACL @ 15.8 PPG. DOWN SQUEEZED CMT THRU "FO", FINAL PRESS=500 PSI. RELEASED RTTS & CLOSED "FO". TEST "FO" TO 1500 PSI. OPEN UPPER "FO" @ 2948' CIRC 13-3/8" X 9-5/8" ANNULUS PRIOR TO PUMPING ARCTIC PACK. DAILY:S81,015 CUM:$395,969 ETD:S395,969 EFC:$1,213,0O0 ~.DRLG CMT TO FLOAT COLLAR 9-5/8"@ 5332' MW:10.6 WBM CIRC THRU UPPER "FO" COLLAR @ 2943' ARCTIC PACKED 13-3/8" X 9-5/8" ANNULUS W/ 180 BBLS 8.9 PPG ARCTIC PACK. CLOSED UPPER "FO" COLLAR & TEST CASING TO 2750 PSI. POOR W/ RTT$ "FO" FINGERS. N/D BOPS & DRLG SPOOL. INSTALLED 9-5/8" PACKOFF, N/U TBG HEAD. TEST PACKOFF TO 5000 PSI. N/U & TEST BOPS. INSTALLED WEAR BUSHING. M/U & RIH W/ CLEAN OUT BHA. TAGGED CMT @ 5208'. CLEANING OUT CMT TO FLOAT COLLAR. DAILY:S191,332 CUM:$587,301 ETD:S587,301 EFC:$1,213,000 RUNNING 7" TBG 9-5/8"@ 5332' MW: 9.8 NaCl CLEANED OUT CMT TO FLOAT~.C_Q~R @ 5252'. )CBU, TEST CSG TO 3000 PSI, DISPLACE WELL TO 9.8 PPG BRINE. RETEST CSG TO 3000 PSI. POOH LAYING DOWN DRILL PIPE. R/U SCHLUMBERGER. RUN CET/CBT/GR FROM 5247'-2800'. RUN GR/JB F/ 0'-3400'. M/U BAKER PKR ASSEMBLY. RIH ON E-LINE. SET PKR @ 3190'. E-LINE. PULL WEAR BUSHING, R/U TBG TOOLS, INSTALLED 7" TBG RAMS & TEST DOORS TO 3000 PSI. RIH W/ 7" COMPLETION ASSEMBLY. DAILY:S44,502 CUM:$631,803 ETD:S631,803 EFC:$1,213,000 TESTING TREE 9-5/8"@ 5332' MW: 6.8 Diesel R/U & RUN 7", L-80 COMPLETION ASSY W/ 5-1/2" TAIL ASSY. LOCATE INTO PACKER, P/U AND SPACED OUT. DISPLACE WELL TO DIESEL. LAND TBG. TEST TBG TO 3000 PSI FOR 30 MIN. TEST CSG / PKR TO 3000 PSI FOR 30 MIN. L/D LDG JT, SEAT BPV. CHANGE TOP RAMS TO VARIABLES AND CHANGE HYDRIL RUBBER. N/D BOP. N/U TREE. DAILY:S255,489 CUM:$887,292 ETD:S887,292 EFC:$1,213,000 The above is correct r For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-8 J°~%~r,,~. ITM Drilling Supt. RECEIVED NOV 1 5 1990 ~--.b~ka .QJl & Gas Cons. J Number all daily well history forms consecutively IPage no as they are prepared Ior each well. 1 ARCO (. and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "FInel Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" shoutd be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided, The "Final Report" form may be used for reporting the entire operation if space is available. tAccounting cost center code State A[~ District ARCO ALASKA INC. Ic°unty Or Parish NORTH SLOPE I Field PRUDHOE BAY ILease Or Unit ADL: 28326 SHL/28308 BHL I Auth. or W.O. no. AS3889 ITitle DRILL & COMPLETE API: 50-029-22024-01 JWell no. PWDW 1-2A Operator ARCO J,~.R.Co. w.~. 22. 0000 I Spudded or W.O, bequn IDate SPUD J 08/29/90 Complete record for each dayre~orted NABORS 2ES Date and depth as of 8:00 a.m. 09/09/90 ( TD: 5360 PB: 5252 SUPV:HMP I otai number of wells (active or inactive) on this ost center prior to plugging and bandonment of this well our J Prtor status if a W.O. 18:00 11) RIG RELEASED 9-5/8"@ 5332' P54:6.8 Diesel FIN TESTING TREE TO 5000 PSI. SHEAR OUT SHEAR OUT SUB W/ 3600 PSI. SET BPV. SECURE WELL. RELEASE RIG @ 0630 HRS 9/8/90. TBG TAIL @ 3269', BAKER "FB-i" PACKER @ 3190', C~v/CO "BAL-O" SSSV @ 2015'. DAILY:S12,287 CUM:$899,579 ETD:S899,579 EFC:$1,213,000 Old TD Released rig Classifications (oil, gas, etc.) Producing method JNew TD Date IPB Depth Kind of rig Type completion (single, dual, etc.) Official reservoir name(s) Potential test data Well no, Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM × length Choke size T.P. C,P, Water % .~OR Gravity Allowable Effective date corrected The above is correct ~"~ I~'~, ~\ O~ Drillina SuDt ~ ~. v '\ '\ . _ . .. . For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3BL459-3-C Number all daily well history forms consecutively as they are prepared for each well. iPage no. DtvlNon of AllentlcRIchfleldCompany ADDENDUM Well # PWDW 1-2A Work performed: INITIAL PERFORATIONS Cost: SN/A Date: AFE: AS3889 Perforated well w/ 3-3/8" Hallow carrier, 41B Hyperjet. Perforated f/ 4784'-4796' & 4862'- 4882' w/ 4 spf. DRILLING SUPERINTENDENT . ( (ORIGINAL þ -II tf "'L\~j(ROFILME Date ....l.2.l1...1/ (TO SUB - SURFACE DIRECTIONAL SURVEY @] UIDA~CE [90NTINUOUS RECEIVED ill OOt NOV 1 5 1990 Alaska Oil & Gas Cons. Commission Anchorage Company ARCO ALASKA, INC. Well Name PWDW 1-2A (7611 FSL, 2521 FWL,SEC 31, T11N, R15E,UM) Field/Location PRUDHOE BAY, NORTH SLOPE, ALASKA Job Reference No. Date 74165 22-SEP-90 LOGaed By: Computed By: MCBRIDE SINES r SCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. PWgW 1-2A PRUDHOE BAY NORTH SLOPE, ALASKA SURVEY DATE: 22-SEP-lggO ENGINEER: M.MCBRIDE METHODS OF COMPUTATION TOOL LOCATION: T~NGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: MORIZ. DIST. PegJECTED ONTO A TARGET AZIMUTH ~ SOUTH 8~ DEG 53 MIN wEST COMPUTATION D~TE: 1-NOV-90 PAGE i ARCO ALASKA, INC. PWDW 1-ZA PRUOHOE BAY NORTH SLOPE, ALASKA DAT~ OF SURVEY: ZZ-SEP-1990 KELLY 5USHING ELSVATZON: 60.00 FT, 5NGIN~Eq: M. MCSRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED D~PTH . TRU~ SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG 0.00 0.00 -60.00 0 0 N 0 0 E 100.00 100.00 40.00 0 B S 66 24 W ZO0. O0 200.00 140.00 0 4 S 65 3¢ W 300.00 300.00 240.00 0 12 S 54 3 W 400.00 400.00 340.00 0 12 S 24 44 W 500.00 500.00 440.00 0 5 S 9 30 W 600o00 600.00 540.00 0 1 S 51 5 E 700.00 700.00 640.00 0 1 N 33 12 E 800.00 800.00 740.00 0 0 N 69 1 E 900.00 900.00 840.00 0 0 N 82 37 E 1000~00 1000.00 940.00 1100.00 1100.00 1040.00 1200.00 1200.OO 1140.00 1300.00 1300.00 1240.00 1400.00 1400.00 1340.00 1500.00 1499.99 1439.99 1600.00 1599.99 1539.99 1700.00 1699.99 1639.99 1800.00 1799.98 1739.98 1900.00 1899.98 1839.98 0 4 S 27 35 E'_ 0 10 S 44 53 E 0 11 S 68 14 6 0 16 S 70 31 E 0 20 S 67 50 E 0 23 S 60 49 E 0 26 S 53 14 E 0 29 S 46 43 E 0 32 S 4.5 10 E 0 35 S 4.3 24. :E 2000.00 1999.97 1939.97 2100o00 2099.97 2039.97 1200.00 2199.96 2139.96 2300.00 2299.95 2239.95 2400.00' 2399.95 2339.95 1500.00 2499.95 2439.95 2600.00 2599.94 2539.94. 2700.00 2699.93 2639.93 2800.00 2799.93 2739.93 2900.00 2899.91 2839.91 0 39 S 24 44 = 0 37 S 19 55 ~ 0 40 S 14 51 E 0 33 S 15 41 E 0 33 S 26 41 : 0 35 S 21 45 ~ 0 37 S 19 12 E 0 39 S 20 41 c o 50 s lz 2~ ~. 0 54 S 14 27 E 3000.00 2999.90 2939.90 3100.00 3099.89 3039.H9 3200.00 3199.88 3139.38 3300.00 3299.88 3239.88 3400.00 3399.87 3339.87 3500.00 3499.87 3439.87 3600.00 3599.81 3539.81 3700.00 3699.60 3639.60 0 54. S 9 54, E 053 S 3 9 w 0 47 S 11 4 W 0 26 S 11 35 E 0 30 S 22 5 E 0 23 N ~5 27 W 245 N 24 58 W 4 13 N 4.0 4,9 W N $0 lO W 3800.00 3799.17 3739.17 7 22 3900.00 3897.54 3837.54 11 55 VERTICAL DOGLEG RECTANGULAR C~O~DIN&TES HORIZ. DEPARTURE SECTIDN SEVEAITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 mEET ~EET ~EET DEG MIN 0.00 O.OO 0.00 N 0.00 E 0.02 0.00 0.01 S 0.02 W 0.15 0.11 0.1~ S 0.15 W 0.37 0.04 0.21 S 0.37 W 0.50 0.00 0.50 S 0.59 W 0.64 0.13 0.67 S 0.64 W 0.54 0.00 0-76 S 0.64 W 0.63 0.00 0.75 S 0.63 W 0..62 0.00 0.7,4 S 0.62 W 0.61 0.00 0.74 S 0.61 W 0.00 N 0 0 E 0.02 S 48 37 W 0.18 S 56 44 W 0.43 S 60 52 W 0.78 S 4'9 ~7 k 0.93 S 43 18 W 0.99 S 40 1 W 0.98 S 39 35 W 0.97 S 39 42 W 0.96 S 39 4.6 W 0.60 0.00 0.77 S 0.60 0.47 0.16 0.91 S 0.4'7 0.21 0.04 1.11 S 0.21 -0.15 0.00 1.23 S 0.15 -0.61 0.14 1.40 S 0.61 -1.15 0.10 1.65 S 1.15 -1.73 0.02 2.02 S 1.73 -Z.35 0-15 2.55 S 2.35 -3.00 0.03 3.ZZ S 3-0t -3.68 0.13 3.95 S 3.68 0.97 S 37 48 W 1.04 S 27 6. W 1.13 S 10 47 W 1.24 S 6 45 E 1.53 S 23 ~3 E 2.01 S 34 48 E 2.65 S 40 Z9 E 3.47 S 42 39 E 4.40 S 43 3 E 5.40 S 42 35 f -4.26 0.14 6.85 S 4.27 -4.69 0.00 5.85 S 4.69 -5.06 0.24 6.91 S 5.05 -5.30 0.53 8.04 S 5.30 -5.69 0.1¢ 8.95 S 5.70 -6.09 0.37 9.83 S 6.09 -6.49 0.07 10.71 S 6.50 -6.38 0.44 11.79 S 6.8'9 -7.27 0.21 13.04 S 7.23 -?-68 0.04 14.48 S 7.69 6.46 S 41 21 E 7.50 S 3a 44 E 8.56 S 36 14 E 9.63 S 33 24 E 10.61 S 31 31 r 11.57 S 31 ~7 L 12.58 $ 31 6 E 13.65 S 30 IH E 14.93 S 29 11 E 16.39 S 27 59 E -8.06 0.20 15.98 S 8.07 -8.17 0.29 17.55 S 8.t8 -7.93 0.91 18.97 S 7.94 -9.04 1.29 19.85 S 8.05 -8.32 0.36 20.54 S -8.34 3.92 21.02 S 8.36 -7.86 3.63 17.85 S -3.95 0.37 12.68 S 3.95 Z.59 6.91 6.39 S 2.58 17.35 1.35 3.54 N 17.33 17.90 S 25 47 E 19.37 S 24 59 E 20.57 S 22 43 E 21.42 S 22 4 E 22.17 S 22 5 E 22.62 S 21 ~1 E 19.51 S 23 48 E 13.19 S IT 20 E 6.89 S 22 1 W 17.71 N 73 28 W COMPUTATION D&TE: 1-NOV-90 PAGE ARCO ALASKA, INC. PWDW l-IA PRUDHDE BAY NORTH SLOPE, ALASKA D~TE OF SURVEY: 12:-SEP-1990 KELLY i.~USHING ELEVATION: 60.00 FT INTERPOLA'TEO VALUES FOR EVEN 10,9 FEET OF MEASURED D,2PTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG 4000.00 3995.05 3935.06 14 29 4100.00 4090.87 4030.97 17 49 4200.00 ¢185.30 4125.30 20 54 4300.00 4277.65 4217.56 24 11 4400°00 4368.45 4308.45 2:5 9 4500.00 4458.68 4398.68 25 34 4600.00 4549.0Z 4489.02 25 8 4700.00 4639.17 4579.17 26 50 4800.00 4727.98 4567.98 Z7 17 4900.00 4816.97 4756.97 27 15 ~ G~.N eR: M.MC.~RID'E 5000.00 4904.32 4844.32 30 35 5100.00 4990.32 4930.32 30 32 5200.00 5076.50 5016.50 30 42 5300.00 5162.47 5102.47 30 43 5360.00 5214.05 5154.05 30 43 VERTICAL DOGLEG RECTANGULAR CQORD[N.~TES HORIZ. DEPA~T!JRE SECTION SEVERITY NORTH/SOUTH E&S?/WEST OIST. AZIMUTH FEET DEG/IO0 FEET N 74 5 W 37.49 6.47 N 74 2'7 W 65.39 0.81 N 79 13 W 9'7.10 2.99 N 84 41 W 135.00 2.87 N 88 13 W 176.$3 1.92 S 89 43 W 219.94 0.60 S 89 1 W 26~.82 0.84 N 89 23 W 306.09 3.07 N 88 30 W 352.04 0.95 N 87 3 W 397.63 2.28 N 83 35 W N ~4 37 W N 84 51 W N 84 52 W N 84 52 W 12.37 N 37.49 W 39.48 N 71 45 W 19.~-9 N 65.10 W 65.07 N 73 1 W 27.17 N 97.12 W 100.85 N 74 22 W 32.39 N 135.02 W 138.85 N 76 31 W 176.86 W 180.26 N 7~ 51 ~ ) 34.86 N 35.06 N 219.97 W 222.74 N 80 57 W 34.58 N 252.8~ W 265.11 N 82 30 W 34.49 N 306.11 W 308.05 N 83 34 W 35.23 N 352.07 W 353.83 N 84 17 W 37.0.2 N 3'97.66 W 399.38 N 84 41 W 446.08 1.43 496.83 0.58 547.29 1.35 598.15 0.00 62~.57 0.00 40.98 N 446.11 W 447.99 N 84 45 W 46.39 N 496.86 W 499.02 N 84 40 W 51.47 N 547.32 W 549.74 N 84 38 W 56.07 N 598.19 W 600.81 N 84 39 W 58.82 N 6~8.71 W 631.46 N 84 39 W COMPUTATION DATE: 1-NOV-gO PAGE 3 ARCO ALASKA, INC. PWDW 1-2A PRUOHOE BaY NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG M[N DATE OF SURVEY: 22-SEP-1990 KELLY 8USH'ING ELEVATION: 60.00 FT ENGINEER: M.MC~R[DE INTERPOLATED V~LUES FOR EVEN lOOO FEET DF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COOREIN~TES HgR[Z. gE°ARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG N 0 0 E 0.00 0.00 S 27 35 E 0.50 0.00 S 24 44 E -4.26 0.14 S g 54 ~ -8.06 0.20 N 74 5 W 37.49 6.47 N 83 35 W 446.05 1.43 N 94 52 W 62~.57 0.00 0.00 0.00 -60.00 0 0 1000.00 1000.00 940.00 0 4 ZO00.O0 1999.97 1939.97 0 38 3000.00 2999.90 2939.90 0 54 4000.00 3995.0~ 3935.06 14 29 5000.00 ~904.3Z 4~44,3Z 30 35 5360.00 5214.05 5154.05 30 43 0'00 N 0.00 E 0.00 N 0 0 E 0.77 S 0.60 W 0.97 S 37 48 W 4,85 S 4.27 E 6,46 S 41 21 E 15.9~ S 8.07 E 17.90 S 26 47 E 12.37 N 37.4,~ ~ 39.48 N 71 45 W ~ 40.98 N 446.11 W 447.99 N 84 45 W ; 58.82 N 628.71 W 631.46 N 84 39 W COMPUTATION DATE: 1-NOV-90 PAGE ARCO ALASKA, INC. PWDW 1-2A PRUDHOE BAY NORTH SLOPE, ALASKA TRUE SUB-SEA C3URSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN KELLY BUSH:NG ELCVATZON: 60.00 FT DATE OF SURVEY: ZZ-SEP-1990 · ENGINEER: M.MCERIDE INTERPOLATED VALUES FOR EVEN 100 FEET DY SUB-SEA OEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HOR!Z. DEPARTURE SECTION SEVERITY NORTH/SOUTH E~ST/.EST DIST. AZIMUTH FEET DEG/IOO FEET ~EET CEET DEG MIN 0.00 0.00 -60.00 0 0 N 0 0 E 0.00 0.00 0.00 N 0.00 E 60.00 60.00 0.00 0 0 N 0 0 E 0.00 0.00 0.00 N O.OO ~ 160.00 160.00 100.00 0 5 S 59 1¢ W 0.11 0.00 0.08 S 0.11 W 260.00 260.00 ZO0.O0 0 10 S 65 59 W 0.26 0.16 0.14 S 0.26 W 360.00 360.00 300.00 0 13 S 32 54 W 0.52 0.00 0.37 S 0.52 W 460.00 460.00 400.00 0 5 S 7 25 W 0.63 0.00 0.62 S 0.63 W 560.00 560.00 5DO.OD 0 3 S 0 17 E 0.65 0.00 0.74 S 0.65 W 660.00 660.00 600.00 0 0 N 53 10 E 0.63 0.00 0.76 S 0.63 W 760.00 760.00 700.00 0 0 N 43 4'3 ~ 0.62 0.00 0.75 S 0.62 W 860.00 860.00 800.00 0 i N 35 20 E 0.62 0.00 0.74 S 0.62 W 0 1 S 42 24 E 0.61 0.00 0.7,4 S 0.61 0 8 S 38 55 E 0.54 0.00 0.85 S 0.54 0 12 S 56 22 E 0.33 0.00 1.05 S 0.32 0 12 S 72 13 E 0.01 0.12 1.18 S 0.01 0 16 S 71 32 E -0.42 O.OZ 1.32 S 0.42 0 20 S 64 29 E -0.92 0.25 1.53 S 0.92 0 25 S 54 Z iE -1.49 0.27 1.85 S 1.4~ 0 28 S 49 4 E -2.09 0.31 2.32 S 2.09 0 34 S 42 47 E -2.74 0.06 2.94 S 2.74 0 36 S ¢0 26 E -3.39 0.43 3.64 S 3.39 960.00 960.00 900.00 1060.00 1060.00 1000.00 1160.00 1160.00 1100.00 1260.00 1260.00 1200.00 1360.00 1360.00 1300.00 1460.00 1460.00 1400.00 1560.01 1560.00 1500.00 1660.01 1660.00 1600.00 1760.01 1760.00 1700.00 1860.02 1860.00 1800.00 0 40 S 29 27 E -~.07 0.93 4.43 S 4.07 0 38 S 22 43 E -4.53 0.00 5.44 S 4.53 0 39 S ZO 21 E -4.91 0.12 6.46 S 4.92 0 44 S 11 27 E -5.20 O.ZO 7.60 S 5.20 0 35 S 2: 16 : -5 52 0 O0 8 58 S 5 0 34 S ~4 lO c -5.93 0.27 9.45 S 5.93 0' 35 S 24 4~ E -6.35 0.28 10.39 S 6.36 0 36 S 21 35 : -6.72 O.1Z 11.39 S 6.73 0 46. S 18 Zq ~ -7.13 0.16 12.50 S 7.1~ 0 5l S 16 24 5 -7.52 0.26 13.87 S 7.53 1960.02 1960.00 1900.00 2060.03 2060.00 2000.00 2160.04 2160.00 2100.00 Z260.04 2250.00 2200.00 2360.05 2360-00 2300.00 2460.05 2460.00 2400.00 2560.06 2560.00 2500.00 2660.06 2660.00 2600.00 Z760.07 2760.00 2700.00 2860.08 2860.00 2800.00 2960.09 2950.00 2900.00 3060.10 3060.00 3000.00 3160.12 3160.00 3100.00 3260.12 3260.00 3200.00 3360.13 3360.00 3300.00 3460.13 3460.00 3400.00 3560.15 3560.00 3500.00 3660.30 3660.00 3600.00 3760.59 3760.00 3700.00 0 53 S 14 1.3 E -7.93 0.27 15.38 S 7.94 0 54 S 3 27 E -8.16 0.23 16.94 S 8.1~ 0 47 S 10 35 W -8.05 0 09 18.4~ S 8 05 0 23 S 10 Z E -8.00 1.28 19.57 S 8.02 0 21 S 21 1~ E -8.19 0.69 20.27 S 8.21 0 19 S 2 13 E -8.41 0.86 20.97 S 8.42 2 10 N 3 52 W -8.27 1.73 19.44 S 8.29 3 58 N 38 45 W -5.78 1.36 14.87 S 5.79 5 17 N 46 32 W -0.68 4.44 9.16 S 0.69 N 56 54 W 10.76 4.31 0.46 S 10.75 3861.68 3860.00 3800.00 11 11 0.00 N 0 0 E 0.00 N 0 0 E 0.13 S 54 29 W 0.29 S 61 22 W 0.64 S 54 34 W ) 0.8'9 S 45 21 W O.'gB S 41 1 W 0.99 S 39 37 W 0.97 S 3'~ 42 W 0.96 S 39 43 W 0.95 S 39 38 W 1.01 S 32 23 W 1.lO S 17 13 W 1.18 S 0 31 W 1.39 S 17 30 E 1.78 S 311 Z E 2.~7 S 3'~3 53 E 3.12 S 42 5 E 4.02 S 42 57 E 4.9~ S 42 59 E 6.02 S 42 36 E 7.08 S 39 49 E 8.12 S 37 16 E 9.21 S 34 ZZ E 10.21 S 32 46 r 11.16 S 32 7 12.18 s z7 13.23 S 30 34 E 14.39 S 29 ~5 E 15.79 $ 29 30 E 17.3! S 27 lB, E 18.81 S 25 45 E 20.12 S 23 37 E 21.15 S 22 16 E 21.87 S 22 3 E 22.59 S 21 54 E 21.13 S 23 5 E 15.95 S 21 16 E 9.13 S ~ I8 E IO.TT 5 87 ~3 W CDMPUT~TIgN DATE: 1-NOV-gO PAGE 5 ARCO ALASKA, INC. PWDW l-IA PRUDHDE BAY NORTH SLOPE, ALASKA DATE DF SURVEY: 22-SEP-lggO KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: M.MC~RIDE INTERPOLATED VALUES FOR EVEN IO0 FEET OF SUB-SEA OEPT~ TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH OEP'TH DEPTH DEG MIN DEG MIN VERTICAL OOGLEG RECTANGULAR COORDINAT2S HORIZ. DEPARTURE SECTION SEVERI'TY NORTH/SOU'TH EAST/WEST OIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 3963.92 3960.00 3900.00 12 49 4067.62 4060.00 4000.00 17 24 4172.99 4160.00 4100.00 ZO 0 4280.68 4260.00 4200.00 23 38 4,390.67 ~360.00 4300.00 Z5 4 4501.46 4460.00 4400°00 25 34 4612.13 4560.00 4500.00 Z5 4 4723.39 ~660.00 4600.00 27 23 4836°00 4760.00 4700.00 27 9 4948.81 4860.00 4800.00 29 10 N 67 57 W 29.43 6.14 N 74 43 W 55.64 2.00 N 78 30 W 87.~2 4.13 N ~3 57 W 127.20 3.70 N 87 53 W 172.88 1.38 S 99 43 W 220.57 0.61 S 99 ~ W 267.97 0.66 N 89 21 W 316.74 1.50 N 87 56 W 368.50 0.73 N 85 29 W 420.61 5.40 9.68 N 29.43 W 30.99 N 71 48 W 17.27 N 55.65 W 58.27 N 72 46 W 25.35 N 37.84 W 91.42 N 73 54 W 31.62 N 127.22 W 131.09 N 75 3 W 4.7,2 N 172.9D W 176.36 N 73 ~9 ~ } ~5.06 N 2Z0.60 W 223.37 N 80 58 W " 34.49 N 267.99 W 270.20 N 82 40 W 34.61 N 316.76 W 318.64 N 83 46 W 35.75 N 368.52 W 370.25 N 84 28 W 38.50 N 420.64 W 422.40 N 84 46 W 5064.77 ~960.00 4900.00 30 44 5180.82 5060.00 5000.00 30 31 5~97.13 5160.00 5100.00 30 43 5360°00 5214.05 5154.05 30 43 N 84 '9 W 478.96 1.42 N 84 IT W 537.56 2.0!5 N B4 5Z W 596.69 0.00 N 84 52 W 628.67 0.00 44.66 N 4'79.00 W 481.07 N 84 40 W 50.55 N 537.60 W 539.97 N 84 ?~ W 55.94 N 596.73 W 599.34 N 84 39 W 58.82 N 628.71 W 631.45 N 84 39 W COMPUTATION DATE: 1-NOV-90 PAGE ARCO ALASKAs INC. PWDW 1-2A PRUDHOE BAY NORTH SLOPE, ALASKA MARKER T-3 K-15 GCT LAST ~EADINS UGNU SANDS PBTD TD DATE OF SURVEY: 22-SEP-199~ KELLY BUSHING ELEV6TION: 60.00 FT . ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = '761' FSL g 252' FWL, SEC31 TllN ~lSE MEASURED DEPTH TVO RECTANGULAR COORDINATES 5ELOW KB FROM KB SUB-SEA NORTH/SOUTH E~ST/WEST 3504.09 3503.87 3443.87 20.g7 S 8.34 E 4133.00 412-~.23 4062.23 22.49 N 75.03 W 4720.00 4656.99 4596.99 34.59 N 315.20 W 5200.00 5076.50 5016.50 51. %7 N 54]'. 32 W 5252.00 5121.21 5051.21 53..87 N 573.?7 W 5252.00 5121.24 5061.2~, 53..~7 N 573.76 W 5360.00 521~.05 5154.05 58.92 N 628.71 W COMPUTATION D~TE: 1-NOV-90 PAGE 7 ARCO ALASKA, INC. PWOW PRUDHOE BAY NORTH SLOPE, ALASKA MARKER T-5 T-3 1(,-15 UGNU SANDS. PBTD TD DATE OF SURVEY: ZZ=SEP-1990 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER': M.MC~RZDE SURFACE LOC~TION = 761m FSL & 252' 'FWL, SEC]! TIIN R15E MEASURED DEPTH 'TVD BELOW KB FROM KB SUB-SEA RECTANGULAR COORDIN4T'~S NORTH/SOUTH E~ST/WES'T 3504.00 3503.87 34~3.87 20. g7 S 4133.0~ 4122.23 4062.23 22.~9 N ~720.00 4656.99 4596.99 34.59 N 5252.0Q 5121.21 5061.21 5).87 N 5252.00 5121.Z4 5061.24 53.87 N 5360.00 5Z1~.05 5154.05 58.82 N 8.34 E 75.03 W 315.20 W 573.77 W 573.76 W 628.71 W FINAL WELL LOCAT[DN AT TD: TRUE SUB-SEa MEASURED VERTICAL VERTICa, L DEPTH DEPTH DEPTH 5360.00 5216.05 5154.05 HORIZONTAL DEPARTURE D[ST~NCE AZIMUTH FEET DEG MIN 631.46 N 84 3'9 W SCHLUMBEROER O I REC T I ONAL SURV E Y COMPANY ARCO ALASKA~ INC. WELL PWDW 1-2A FI ELD PRUOWOE BAY COUNTRY USA RUN ONE DATE LOOOED 22 - SEP - 80 REFERENCE 74 ! SS WELL'. PWDW 1-2A ,(761' FSL, 252'~ FWL, SEC 3] ;11N, R15E, UH) HORIZONTAL PROJECTION NORTH 800 REF 74 ! GS SOO 400 ~00 -200 -400 -600 ~OUTH -800 HEST SCRI - -400 -~>00 0 2:00 400 600 EP. ST WELL" PWDW 1-ZA ,(761' FSL, 252' FWL, SEC 3- T11N, R15E, UM) -~--~ VERTICAL PROJECTION -400 -~00 0 0 ~00 ~00 ~;00 800 1000 !200 ITT"f"F~-':'"FFt-'-FF'F?'~'-t"f-P;" -T":.'".t'"f"~'"H'"f'm' "?"r?"r'-m'+t--:'-'"t-m--'? L~.-,-~-~--,...t..?.,...L~...~..?...,... I-..?, ....... ?~...?,...,--.: ...... ~...,...,...,.-.l.--?, ........ '-~-T"r"F'T"'T-?~'-t"' '"t-yF'?'"f-t"y"r"~ '-T"r"?T"f'T't"f?" '"f'"t"t"?'f-f'"f'"f'"f-i '"f'-'t"'f'"f"t"H¥4'-'~ ....... t---~'"t'--t---t-'-t---f'--f---f ....... f-.-+-.f--.~-.-f.-.+-.f.-+-.f-, q ..-f--.+--?Hb.H+..H+.. H---¥4---;---~-;.--~--.~..4 ....... ~--.~...~.-.L.b.~...;...~...:..-~...;...:...~...~...f..~.-~.4...~.-.....~-4...;.--L-f..L.L..~...~ ...... -H'"H"-~'-H--H"-~ '"~'-'H"'~"i'"H"H'-~ "-H'-H"-t"H'-H-----H.H.HH..-b~ -t'-1--T-'t--- -"t-'-?'-?t ....... ?'-??-'?y.t...??~ ...... tl~--?.?-..H-~ ........... ;.-4...~...+...i...~.-~..~ ...... ~..;.-.~...~,..~...~...~...~...~ ...... ~-.+...~.., ~.4.. ~...~. ~ ..~ ~_~ i ' ~ + ~: ~ ~ :; ~ , ~ : m?T'"-T'TTT-']'T?-?-r'-I'"~T'H .....t'T"~"~'"rT"~'i'~" '"f'"~'"~-~'~'-t"r-f'"f''' ...f...f...f...f...~...f._+.¥.f_.._f...f...~...f._~...?.f...?.] ....... f.+_t.,t ...... +--!-"~--f ....... +'"f'"+".~ ....... H.-+..., .... --t-~ -t--t- '"~'"t'"t"'t"'] '" mT'-t'"T ...... t'":"T'-~ ...... ?t-.?---y- -?--t.-t.- ..--~-t.-.t--. ..... ~--.f..-~--~-- ..~...H.f..-~-....~..~...~...i...~ ...~...~.-.~...~ ....... ~...i...~ ......... i...~...+..~ ...... ~...i...~..4 ..4 ...~-.~...:...~ ....... :...~...:...~ .... -?t"??'---t--?-i-~-~'-'??~-?--~-td ...... H-+--?~LH-++" H-H.+:~H.-H.-.4..H...~...~..+.4.-bb....~...bH...b4.+.bl ....... b~-..H ....... H...H ...... ~..~...~...~...:...;...H..,i .... '"'"~-t'"t'""?-??t ...... t'"t'-'+-"~'--f--t.-.~.--~..-~ ..... f...H.H.f._t..4...H.H.~ ...... ~...~...~_~.,.f_.~...~...~...~ ....... ~.-.~-~...:.-.*...~...i..4...~......~...~-.4...~ ....... i...~...~.,.~ ...... :...L-~.4 ...... ~. ~ ~ ~ : : : : ~ ; : : -~--.~-.H4-f-4.-.H~---~...--~-~-.4-.-~-+-~---~-.-~---~--' ;-..~.--~4...~-~-~.-.~..4...~.......~._& ~ _: ~ i : ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : , ~ , . : ~ : ; : ; . ~ ; : t : ? t t T ?'" :'?"T"~ ....... t.--?..~--'~ ....... .'".'"t'". ...... -"'~'"t"'~'" -T'TT'T-~'T'?T"?'~-YFT"?"~'T"FT"T" '"~f-l'"?'?T" "-t'-f--f-~ ....... f-"f'"f'-f ...... .4..4-~...i...L-~...H.4...:..-b~...~4...L.~L-~.: ...L.LL&.-.L~..~...~-4...~...L.Li4-:.4]~.-j...J ....... LLL.L ._~...L.LL~...~._~_.j...j...i...~..4...i...j ....... L.L.L.L ,..LL?..J ...... L.~...L~ ...... LLL,L. -.H'..;-..~...L-~...;...~...:...-.~...;.4...: ...... '_._.~...~ .... ~.-.I...I.4 ...... H~---;..4.-. '-.I.-.~---~.-4- ~ ~_~_~ i i i i_ ~ ~ I ~_ ~ : i ~ ~ I_L1 i ~ ~ i J ~ ~ i ...'-4..L.' ' ' ' -f'"t~-r ............ t"?" '-t'-?t-t'~'-~?t ..... "t"'?~"'~ ..................................................... ~.-~ -Y~ '%"T" 'T'P?'?'" "T'T'T-T ....... ~'"~T'1-T ....... r-'?--?--~----???-~ ....... ~?-t-~ '"H-??'~'--~."H-?--?~ ....... t-~'"~-+-'~'-~"-H-f'-~..-..-~-.-'-..~-..' ...... '""-,-' --' ...... ~.-.+---'-..' ...... '... '... '-..~-.-r-~.,.~...~..-~-..~.J.--~.--~ ...... ~-..~...~-..~...--~-.~...~...~ -?'?-? '"t'"t"??~ '"?"H'"?t"~t"f~ -'~"~'"t'" "T-t'"~-? '-1"'~'"~'-t'"T"'~"'~ --.~.-'?~-.-H~..%H~.--+ ..... +.-~---f--+ ....... H+.+.+-. F...+-.-~.-.~-.+.-----H~.--;..+..~-..~..+..HH ;.4.-4..4--~ ....... ~...~-4 .......... ~...~.-$.-~ ...... L..~..4-~ ....... ¥-;...H~ .... -~e+.+---.~--+-H~-----+.+-HH.--+~H+~ ~H;~.~4~+~.~"~.~.~;...~.4~.;.~".-~.~.~b~.;~4~ ...;...L..~-;... ~ ~; ~ ,4 ~ ~ ~- 4 ~; .& ~ ~.4. ~ ..... L..~...L,; ....... ~..4...~.-~ .... T ~ T' T"?"TT'T'T'PY' '-T'-!"T"T'" 'T'T'"T~'"r"T",'"t"'t" '-T'"t-r"T .....?'F~'"r" "'-r'?"r"t'- '"~-'yr"~ ....... r"r'?"t ..... t'"T ..... ~ ...... t'":'"~ ........ '-. 'tT't'"'---t---t--'t-~---~'-?-',--?-?-~--'~.~y~?'~. -~'"t'"t'",-"~-'f'"~'--~.-f--- -f'"H-f'"' "+"f'"f"f'" '"f'"f'-f'"+'"t'"~"'+" .-H¥-H+-.f,4..+.-~--H--.H-.-H.--~ '"?"y"t"? ""?'?~'-+'- -~?"t"'-*~-?? '"?---?-?+-]'--?+-+--?----*..-?~.+.-,--+-+-+..t--- .... F'???-'"?-'?"J'"?--t-~--t-?"t--?-"?"-~'--? '-?'?-~'"? "'?"'F'?"'~ ....... }...fl.t... · -~-~--~...f-,-+-H..4--.~--.H-H..4---~--4-.-b-H--. r-.H--4..4 ...... H--H ....... H-4---~......b.L.H..-,.4.,.~..,L-~.....4.4...b.L.~...L4...L.~ ...... ~,..~...~...~ ....... H---b.~ ...... LL.~.,,b..-H...b-~ ...... ~.-bL.~... · 4,,-f4---f.., ..-?t..~.--?.~---?DH-.- --.r-.f,-?4--- -.-~nhh -+-H--H--,H.-+,-~ ..... H---bm-- -.~-~+-~---~--.~.-f-H~ ...... HHHH,..4--HH~ .......HHHH, ,,,HH;-.;-- .4..4-.~...,.4..4..4...~.-, ...i...~.-i,.,i.-~,.,L..L..i...i.,. --L..~-.i,-i ....... i...i...~.-i ...... L..L.i...~ ....... L.L.,L.i ....... L,I..I,,.~ ...... ~,,.I..,!...i,,. .-~.-~..~...~-...4...~...;-,~.....,~...;...~..4 ....... -4.H--i-.~---H.--f.i---'-'f'-f--H'-"H-H--' .H.H-....4.-H---b 4-H--b +H-+-,-H-H--.~.H-H,.--H...~,--~ ...... H..H...~.H...b~ ...... ~.H.,.~ ....... H..H ....... b~..-H... '"fT'r'T-["?T"??'"'"T"t-?t"'l"-t---f-t-"t--" '-+.+--f'+.-:-t..-t---~-.? '-'t-t-+-~- · T.~-.,-.,--.---?,.--?,..- ,-~..- *.--*-.-* ....... --~-H{.-+-[.-.:-?:-?.-,---~.?.-:..-.-..??f-~ ....... t-.+--??-,---,-+-t.+-- -Hf-++-.-++..,---,-.-+-t.-.t.-+..~-++-+.,.-...+.+.+.+...-.?..?+.+-~.-+-.t...j...t ...... ?t...t..., ....... +..?...t...t ...... t.-.t...t...t -H~-H ;-HH*..-H ..-HHHH--4-H+.4---.-.~ ...~---H+--~-- ...... ??'!'"' .... f-¥..H! ..... HHHH--4--.b4--4-T4.-4.-4--.~ ...... H+-.4.-4--- .... t~H-H '"f"H-{""'-H~-HHI'"¥-HHH ..4--4..4---~ ....... HHHH.-4-..{---*--}....4--~---HH-.-4-.4-}..-H.-..}.-.}-..;-..~.-.....L..L4..4..+..L..;.-;...i ....... i...}...L.L.+..,...L..L..I ....... ~...L..~...~-+..;...;...;...;... ?--?+..~--.+-+--?-f--.--.f..~-Hb.l--4.--H¥4--- ..4--4...¥.H .-.4--4-.4.-H.-HH}--4... ".}-.-H+..4--- H...¥.~--4.--. 27S J PROJECTION ON VERTICAL PLANE 27S. - 9S, SCALED IN VERTICAL O£PTHS HORIZ SCALE = 1/200 IN/FT I TELECO ] Te,eco OilfJeJ~r''"" ,ices of Alaska IllC, 61~! 6 Nielson Anchorage. AK 99502 (907) 562-2646 ORI61NA[ September 27, 1990 JOB #775 ARCO ALASKA, INC. WELL: DS PWDW1-2A PRUDHOE BAY RIG: NABORS 2-ES Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to ARCO Alaska Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincere 1 y, Field Operations Supervisor JGM/el Enclosures RECEIVED A ~1~111~'1' COMPANY Company: Well: Location: Rig: Arco Alaska Inc. PWDW1-2A Prudhoe Bay Nabors 2ES TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 08/28/90 .:~ TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 775tak 30.1° 0.0° 30.1° 272.8° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* TIE IN COORDINATES 3500 0 0.7 160.0 3499.85 -11.43 22.26S 10.34E 24.54 S 24.92E 0.00 TELECO IN WITH MOTOR 3685 185 4.1 315.6 3684.71 -7.01 18.59S 6.10E 19.57 S 18.15E 2.57 3874 189 11.5 300.0 3871.85 14.75 4.33S 14.98W 15.59 S 73.89W 4.04 4065 191 17.6 284.6 4056.70 60.01 12.49N 59.47W 60.77 N 78.13W 3.76 4254 189 22.6 276.2 4234.17 124.30 23.63N 123.28W 125.52 N 79.15W 3.05 PAGE 1 Company: Arco Alaska Inc., Well: PWDW1-2A, Location: Prudhoe Bay, Riq: Nabors 2ES Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 4474 220 25.7 268.1 4434.95 214.08 26.61N 213.03W 214.68 N 82.88W 2.06 4724 250 27.8 269.2 4658.18 326.30 24.00N 325.51W 326.39 N 85.78W 0.86 4978 254 30.7 274.4 4879.81 450.27 28.15N 449.43W 450.31 N 86.42W 1.52 PAGE 2 TEL SO Oilfield PLAN VIEW Service~ 800 Arco Alaska Inc. PWDW1-2A Prudhoe Bay Nabors 2ES JOB# 775tak/O0 SCALE: i inch = ~00 feet 700 60O 500 4OO 300 200 100 Z --I '-F 500 400 3O0 20 WEST ?ft) lO0 0 ~00 -250 3250 TE, ,CO O~lf~eld Service', VERTICAL PROJECTION 0 250 500 750 1000 1250 35OO 3750 ~4000 04250 >4500 4750 5000 5250 5500 3500 .7 3~585 ' 4. ~. Arco Alaska Inc. PWDW1-2A deg Prudhoe Bay Nabors 2ES JOB# 775tak/O0 ~eg SCALE: 1 inch = 250 feet. 423874 ' 1~..5 deg 4065 ' ~.7.6 oleg 54 ' 22.6 deg 74 ' 85.7 dog ~4. -~ '4 29 778.8. deg 30.7 deg VERTICAL SECTZON (ft.) AOGCC GEOLOGICAL MATERIALS iNVENTORY LiST PERMIT ~ ,~ - //~::F~ WELL NAME /~,~/... /zh/.p~... / COMPLETION DATE ? ! ..~,o ! ~'c, CO. CONTACT /~)/'~ cored, intervals c;;'e a~laiVsis' ~ ...... j'~y ~li'tch intc~a'iS .... i i ii ii iiii ii i mi i iii ii Illll IlIlIlI II J I I II I IIII I IIII IIII III I II III II II I I IIIIIII I I III IIII IIII II iii iiii i iii i I II I I III III [ IIIII IIII II I I I ~ot req, uircd'li'st as NR' i .... ~ digital ,.data i i ii i ii i ii ..... ""l'd"'-r'~nc ................... J'" RUN Ikl'r'L"nt~'~'!L" ' SCALE I1~11 I LJr'IL¥~LO ......... N,,O.' ......... [to thc nearest foot] [inchl100'] ............... ~ ,,&,/,&~ , ,~,, ~ ........ / ~ ~ ~/-- ~2-~ /, , ~ ..... i iiii ill I I iii i i i i i ............................. 2',,~,I.~,,~,,, ?~/~-/.~ ..... ~ ........ ~/~.-.r-~/~-, ,.,, , ~i~! ...................... 11! ................... f ......... ~i~ .............................................. 1 41 151 I i i i i ii i mi I ii ii i ii i i , P . ~ ............. - ..................... 1'~7) I i"i"~! ................... ! ii I I III I IIIl' I I I I II I IIIll IIII I ~ I I I I III II I I II II I Ill I DATE' ~ (::,-~ 7-90 REFF*RE;NC.:E' ARC(_] CA:~E'D HOLE HAVE A N':'°c, ~.,.~. DA'"'":, . ;:"-:AL.L.Y FiOFF':::'""K,...:.. E:'F:. ATO'-'i 5-29 D I :~' 'i" R I B tj "[ ]: 0 N :,~ CE:NTRAL. F I L!.E,? · 'ii:C I-'i lie V I:;:. 0 D & P'i q~: EXTE-"N~: ~ ON EXF'LOF,'A]" Z ON -"- E"x' X 0 i',l. · ir ... : HARATi-tON · "' HO]31'L THE: ................. (]: Fi F.' i:;: I:: i": ".."' F' D AF'I:~: FOR F"WDW~-''~''...:-~ I ~'," 5¢:-029-22':::',:.!4 .... (:)~: RECEIVED OCT 1 9 1990 Ala;ka 011 & (3~s ¢on~. Conlrnission Anchorage AIR(;:(] AL.A~¢KA: INC., F',O, BOX 't ,:.}~S6~:~ ANCHORAGE, ALA;~KA 99~'i ,::} DATE' F,,'EF[-:[!:;,'ii-~NC.k]' ARCO DIRFCTIONAL DATA 9 '-- 4 _~!: 9 - 2 - 9 ".3' M W I) D t F:. E C T ]: 0 N A { .... ~," U R V E Y ..! 0.6:¢ ~: 7 7 6 ,-~ .-. o_,~ o o c, M i,,J D D 'r R E' C '¥' ;[ 0 N A L ;i: U F;..' V E "? ,J 0:64 :~ ''? '7 :~; F'WDW'i '-¢~-~ ~., ."¢-, ......... '" ;~: R E: C Iii: I. F:' T 0 F' D A T A ,. ~-- L [::. A a. ~: ..':T. ]: r' i'.~ A N I) R E:T U F: N T H E A T T A C::I"fE',"'" C 0 ~"' Y A ~.~.' , i.-iAVE A N:[C.E DAY; ' A L. ~ Y i..l 0 F F: E: C ~'-'' F R ~o_ · io. ATO- i ':':2° D :[ ,?TR ! BUT ]: ON C. ENTRAL FILE::"] C.: H E' V R 0 N D & M .... :: .-.*..... ~ --, ,, · ~: E:..,, ~ [:.~q~':. I ON F"..,."Pi !]RAT i ON · "- EXXON HARATHON MOB :[ L P H I t_ L :1: F:' 2' I::.,_ F' ]: L , .~: .... :~: P B W TM L. E: Y r ", C ri p ]: [:' 5; ) R & D "" BPX · '- 3~'f'AT~:: OF ~LA;~KA T E X A C 0 RECEIVED OCT 1 6 19 0 Alaska 011 & I~aa Cons, Commission AF,'CO ALA2KA, INC~, F'., 0 P,F.)v,.-, 'i ;'-'~ E:, 3; 6 (D ANCI4ORAGE, ALA2KA 995i DA TE · 9- ~ 7-9~') pi:-F~:Rr.-kiPE. ., -,.,. ,. ............... raRCO CA2ED HOLE F'INAI_,:? 2.- 7 9- 7- 9 0 'f'B g C U T T E R R U N (5-! 8 ,..,°-"." i,.., -.- '~' ,':;. ... F'EF;.:F RF:F'.'['iF;:O .......... Rt iN 9....... ':~ ..'~; E: -- .3;,:.') - 9,::.;, G Fi' I N C A :?' I N E Fi: U N 9 -4 ~ 8 -;5 ¢ - 9 ,:::, C B T ~;.: U 9 ..... 'l 5 ~::,._. % ,-':~._ ,~, ;.~ i': r:' T i:;.: i J N · :,..~ ,,_ ._, ; -.. ..0 ~.. . . 'i "..2 -'2 9 9 - ..;. - 9 6, A C B L / V D L /21 (;; R (..i N i ':; ....... F.:~ N ._: .... i .". o F' i'D K - i ((:,:3 / 6 F;.: / ,.: ..... ,*-9(!:, f"F:i /BOi:;.'AX . i 6 .-- 2 4 9 - ,4 .- 9 ,:.} C' 0 L L A F.:/F' [:.:' F,.' F-" F;: U N 'i ':::' - '::' 9-~- i (9 .-- 9 ;..:.~ F: D K - i ,'..} 'S-'-...-" G R/" C C L. F.: L.I i".-i P W O W i - 2 A 9 '- 6 '- 9 '::";,C: B T F;.: U N P W D W t - 2 A ? - ,6 - 9 (-) C E T F;.'. L! N F't,JDW. 'i -2R 9-'?-"76, F'K R :~,"E T"i" i NE r" - :'" ?-',',, t:.:. ,... ~_~ l ,.. D:' F,,'U N i, i, i, *.,I ....... i; j''' j'''" -- P L E'A J:.' E ,~ Z g- N A N D R F T U F,' N T H E A T' T A C H E D r": r',, P Y A 2 ~;' r:..: E I P T r'~ F:' D A T A., RECEIVED HAVE A NICE DAY'! H r) F: F'E F.' I<' F R i ... i ,..-' : SEP 1 9 1990 ,,, Alaska Oil & Gas Cons. Gommissi F' r.;'i.';: o Anchorage :'? L': i..i £ C: A T I... A S' A A"[ i.. A 2 A T' i... A S'CPt ,~' C I--t D I 2'f'R I BUT i ON :~ . F'.'i:NTI-:..'AL_ ,_ FILE3' ..-'"'F'H i LL t_'F':"';' ~ CHEVRON PB WELL. FILES D & M R & D -,- EXTENSION EXPLORATION :,~: BF';',;: '"' EXXON '"' ,~ I ~'-4 f'~[ (]F AI_J~Ix A · ~ i'-iA R A THON 'i' EXA C O · .- ~OBIL. August 21, 1990 Telecopy.. (907)276-7542 J. D. Gillespie Regional Dri%ling Engineer ARCO Alaska, inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Re: Prudhoe Bay Unit PWDW 1-2A ARCO Alaska,-Inc. Permit No. 90-118 Sur. Loc. 761'FSL, 252'~, Sec. 31, TllN, R15E UM. Btmhote Loc. 76!'FSL, 348'FEL, Sec. 36, TllN, R14E UM. Dear Mr. Gillespie: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrfll does not exempt you from obtaining additional pe~its required by ].aw from other governmental agencies, and does not authorize conducting redrilltng operations until all other required permitting determinations are made. The Commission will advise you of those BOPE tests that it wishes to witness. Sincerely, Commissioner Alaska Oil and Gas Conservation Commission BY ORDER OF THE COMMISSION dlf Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ,~-. STATE OF ALASKA ALASKA _ AND GAS CONSERVATION Cf, MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill -- Redrill _~lb. Type of well~ Exploratory ~ Stratigraphic Test ~ Development Oil Re-Entry - DeepenEI Service %,/ Developement Gas J_ Single Zone - Multiple Zone 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 761'FSL, 252'FWL, Sec.31, TllN, R15E, UM At top of productive interval 761'FSL, 152'FWL, Sec.31, TllN, R15E, UM At total depth 761'FSL, 348'FEL, Sec.36, TllN, R14E, UM 12. Distance to nearest property line 152' feet 13. Distance to nearest well feet 16. To be completed for deviated wells Kickoff depth 3500'feet Maximum hole an~l~' 9° o 18. Casing program size Specifications Hole Casing Weight ! Grade/Coupling I Length 19. To be completed for Redrill, Re-entry, and Deepen O Present well condition summary 5. Datum Elevation (DF or KB) RKB 60' feet 6. Property Designation ~ ~8~ ~ ~Brface 7. Unit or property Name Prudhoe Bay Unit 8. Well number PWDW 1- 2A 9. Approximate spud date 08/21/90 14. Number of acres in property 2490 10. Field and Pool Cretaceous Pool Undefined 11. ~pe Bond(seo20AAC25.025) Sta%ewide Number No. U-630610 Amount $200,000 1553P2rbOl~)ed depth (M~ and TVbi 5200 ' TVD feet 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) 2044 Maximum surface psig At total depth fTVD) Setting Depth Top Bottom MD / TVD I MD ! TVD 3o'' 1 326' 15 oo' )erations. 2564 paid Quantity of cement (include stage data) 500 sx CL 'G' Total depth: measured 6005' feet Plugs (measured) 3500'-4126' Class 'G' Cmt true vertical 6005 ' feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural 80' 20" 2850# Poleset ll2'MD ll2'TVD Conductor 3435' 13-3/8" 2000 sx CS III 3467'MD 3467'TVD Surface 600 sx Class 'G' RECEIVED Intermediate Top job w/250 sx CS II Production Liner ~UG ~ 0 ]~)JO Perforation depth: measured il~k~ O./J ~ (~a~ ~ ~~ true vertical ~t,~C~10 .~_.` ;,¢,~- 20. Attachments Filing fee ~' Property plat [] BOP Sketch IA' Diverter Sketch 23 Drilling program ~ Drilling fluid program I~ Time vs depth plot [] Refraction analysis [] Seabed report ~ 20 AAC 25.050 requirements 21. ! hereby certify that ,the for,e, going is.. true and correct to the beSt of my knowledge Signed Title Commission Use Only Permit Number I AFl number I Ap~v~8~0 ~' - ~ ~¢¢~ ~ov'er letter ~ -//~ I 50--O~ ~ ~~ ~O/I U~ / /~ / for other requirements C~ndi' --tion9' ' o~''~pproval ~m~le~ required ~ Yes ~N'o MU'd'log requi~ed ~ Yes ~ No ........ Hydrogen sulfide.measures ~ Yes ~ No Directional survey required ~Yes ~ No Required workin pressure for BOPE~q~2M' 3 · · ~ ; 1 ~~ /b~// . / byorderof _ Approved by ...... ~~(. ~~ Commissioner the commission Date 0-40 Re , 4-85 , , PWDW 1-2A REDRILL) PROCEDUF SUMMARY 1. RIH with angle build assembly and sidetrack the well at 2/5 deg / 100'. Build angle to 27 deg 55' in the S 89 deg 58' W. Maintain angle and ddl112-1/4" hole to 5200' 'I'VD / 5326' MD. 2. RAJ E-Line. Run open hole logs. R/D E-Line. 3. Run and cement 9-5/8" casing. 4. Clean out 9-5/8" to float collar. Test 9-5/8" casing to 3000 psi. Displace cement with 8.9 ppg NaCh Retest casing to 3000 psi. 5. R/U E-Line. Run CET / CBT / GR. R/D E-Line. 6.Run Baker 9-5/8" x 5-1/2" packer on drill pipe. Set packer at 3200'. Test packer to 3000 psi. Lay down drill pipe. 8.Run 7" seals, tubing, and SSSV. 9. Displace well with diesel treated with corrosion inhibitor. 10. Land tubing. Test tubing to 3000 psi. Test packer and casing to 3000 psi. 11. Set BPV. Nipple down BOP, nipple up tree. Test tree to 5000 psi. Secure well. 12. Release rig. 13. RAJ E-Line. Run GCT gyro. Perforate well. R/D E-Line. NOTE; a. Excess non-hazardous fluids developed from the well operations and as necessary to control the reserve pit fluid level will be pumped down the 9-5/8" x 13-3/8" annulus. The annulus will be left with a non-freezing fluid during any extended period. The annulus will be sealed with 300 sx of cement followed by Arctic Pack. b. There are no surrounding wells within 200 ft. of the proposed well. c. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.033. d. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/fi). e. Based on previous logs, no potential productive zones are antidpated above 3500' TVD. f. No potential hazardous levels of H2S are antidpated in this well. PWDW 1-2A MUD PROGRAM DEPTH DENSITY PV YP INT 10 min FL OIL SOLIDS MUD (TVD) (PPG) (CP) (#/ft) GEL GEL cc/30min (%) (%) TYPE 13-3/8" 8.9 10 6 2 4 25 0 2 LOW to to to to to to to to SOLIDS 5200' 9.6 15 12 4 10 15 6 NON DIS- PERSED 1. THIS MUD PROGRAM IS ONLY A GUIDELINE. ACTUAL HOLE CONDITIONS WILL DICTATE THE ACTUAL MUD PROPERTIES. ii i ii ! i i i I i Ii I i I I I I I I i i I l ]~KR F~I'JRVATTON' 60' ~ 20' Casing TVD=I12 TME~ll2/'~'~"--O AR¢20 ALASKA, Ii C. PW[)Wl-2A SHL: U ! IN ?5£ 31 767' FSi, 252' FWL TI-IL: U 1LN 14£ 36 76l' FS:~ :348' FEL BHL: U 1 IN 14E 36 761' F$ . 348' FEL S 89 58' ~V 13-3/'8"Casing TVD=3467 TMD=-3467 DEI~. 0 KOP TVI~-3500 ~?.~ AVERAGE ANGLE = 27 55' ~ TVD=4500 FMD=4534 DEP=229 F_.DC TVD=[$73 ~17 DI~= 267 ,,, ~.~¥~,~0-5/~' C..~in8 TVI~$200 T dI~5325 DEP=$99 'I'D j TARGET TVI~-$200 "MI~-$326 DEP=$99 RECEIVED m. UO 2 o 1990 Afasra l il & Gas Cons. ~ mmlss~ .......... ii ....... i ............................................... 1000 2000 3000 40oo 6000 7OOO 8OOO 9OOO 10000 0 1000 2000 3000 4000 5000 6000 7000 VERTICAL SECTION ARCO ALASKA, INC. PWDW1-2A S 89 58'W 2000 1000 0 0 I Z E - W COORDINATES -3000 -2000 - 1000 0 1000 2000 3000 I I I I I I I I I I I I I I I I I [ I f I I I I I I I I I I I I I I I I I I I I I I I ............... I I i I I O 3000 2000 I000 0 -1000 -2000 -3000 -3000 -2000 -1000 0 1~ 2~ -4000 3000 ARCO ALASKA, INC. E - W COORDINATES PWDW1-2A -800 300 2OO 100 I I T T I ' I T I I I i i I I I I h I I i i I I I [ I I I i I I I I i I I I I I I I I I I I I [ I I I I i I I I T i I I I I I I I I i I I I I I I I I I I i ii I [ [ I · ~,, ~, ,~ ......... ~1 ..................................... ~ ..... ~ ............... ~1 ......... -400 -800 -700 -600 -500 -400 -300 -200 - 100 0 E - W COORDINATES 300 200 10o o O -100 ! -200 -400 io0 -300 13-5/8" 5000PSIBOPSTACK i ii i i ANNULAR PREVENTER 7 PIPE RAMS 6 BLIND RAMS 5 DRILLING SPOOL PIPE RAMS 3 TUBING HEAD 2 1. 13-3/8' CASING HEAD 2. 5000 PSI TUBING HEAD 3. 13-5/8' - 5000 PSI PIPE RAMS 4. .~000 P~I DI::III~J_ING 5. 13-5/8" - 5000 I~SI BLIND RAMS 6. 13-5/8' - 5000 I~SI PIPE RAMS 7. 13-5/8" - 5000 PS[ANNULAR ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID, 2, ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED wrrH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5(X)0 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5(XX) PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RE'CORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETION/ WORKOVER OPERATIONS, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST BOP WEEKLY. DAM 11/20/89 BOP SCH (FOR: NAB 2ES) CHECK LIST FOR NEW ~ PERHITS IT_=~M APPROVE DATE (2) Loc (2 thru 8) (~) (3) ( ,~. (~o =d '~'_~) " (14 =hru 22) 28) - ' - ~Es NO ~_~~ ' I. Is the per~:3.: fee attached .......................................... ~ .......................... 2. Is well =o' be loca=ed in a defined pool ....................' ....... , 3. Is well loca=ed proper dis=ance from property line .................. ,., , 4. Is well !oca:ed proper dis:ance from other wells ........ ; ........... , ..... 5. Is sufficien= undedicated acreage available in this pool ............ 6. Is well =o be devia:ed and is we!lbore pla= included ................ ___ 7. Is opera:or the only elf et:ed parry. ................................. . ,,, 8. Can permit be approved before fif=een-day wait ...................... 9. Does operator have a bond ia force .................................. ~. · 10. is a conserve=ion order needed ...................................... . ........ ~ 11. Is adm~.uis=rative approval needed ................................... 12.' Is the lease number appropria=e ..................................... Z 13. Does =he well have a u~ique name and number ......................... ~ _ 14. IS c6nduc:or s:ring provided ........................................ 15. WiLl surface casing pro=act all zones reasonably exy. ected to serve as an u~derground source of drinking wa:er ..................... ,, , 16. Is enough cement used =o circuia:e on conduc=or and su~ace ......... I7. Will camen: tie in surface and in=armediate or produc:ion s=rings .., 18. Will cement cover ~ kno~a productive horizons ..................... 19. Will all casing give adequa:e safety in collapse, tension and burs=.. 20. Is this well to be kicked off from an e?~s=in§ wellbore ............. 21. Is old wei!bore abandonment procedure included on 10-403 ............ 22. is adequa:e weilbore separation proposed ............................ 23. Is a diver~er system required ....................................... 24. Is =he drilling fluid program schematic and list of equipment adequate ~'" 23. Are necessary diagr~ and descriptions of ~ mm~ BOPE a=uached.~ 26 Does BOPE have sufficiau= pressure rauimg - Test to ~OOdP psig .. 27. Does the choke ~ifoid comply w/AP! EP-53 (~ay 84) .................. 28. is the presence of H2S gas probable ............................. ~... rev: 01/30/89 6.011. For expiora:ory and Stratigraphic wellsr 29. Are da:a presenued on po:au:iai overpressure zones? ................. 30. Are seismic a~alysis da:a presented on shallow gas zones ............ 31. If au offshore loc., are sum~ey results of seabed condicions presenced . . 32. Additional re~uirem~u=s ............................................. ,-~