Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout190-1277. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU S-23 Weld Starting Head, Install POGLM Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 190-127 50-029-22088-00-00 11634 Conductor Surface Intermediate Production Liner 9224 80 2669 10899 932 11582 20" 13-3/8" 9-5/8" 7" 9188 34 - 113 33 - 2702 29 - 10928 10692 - 11624 34 - 113 33 - 2702 29 - 8732 8567 - 9217 Unknown, 11582 2260 4760 7020 None 5020 6870 8160 10949 - 11408 4-1/2" 12.6# L-80 27 - 10714 8746 - 9067 Structural 4-1/2" Baker F-1 Packer 10625 8522 Torin Roschinger Operations Manager Hunter Gates hunter.gates@hilcorp.com 907-777-8326 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028257, 0028258 27 - 8583 N/A N/A 93 413 89 234 93 91 700 1800 320 320 324-474 13b. Pools active after work:Prudhoe Oil No SSSV Installed 10625, 8522 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:55 am, Sep 30, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.09.30 07:57:57 - 08'00' Torin Roschinger (4662) J.Lau 11/6/25 RBDMS JSB 100225 ACTIVITY DATE SUMMARY 10/4/2024 T/I/O = 610/652/1 Temp = SI. CMIT-TxIA FAILED to 2750 psi. LLR to small to register with pump. (PATCH TUBING / LINER) Pumped 37 bbls Crude into TBG/IA to reach 2753/2750. 1st 15-minute loss of 111/117 psi, 2nd 15-minute loss of 65/66 psi, for a total loss of 176/183 psi in 30 minutes. Multiple attempts made to perform CMIT-TxIA which all failed. On 4th attempt lost 60/64 in 15 mins, lost 50/51 psi in 30 mins, lost 46/48 in 45 mins and lost 44/47 in 60 mins for a total loss of 200/210 psi in 60 mins. See log for details. Bled WHPs to 493/285 psi. Monitor. Gained 174/260 in 30 min monitor. FWHPs = 667/545/2 Valve Positions: SV/WV/SSV/AL= Closed, MV= Open, IA/OA= OTG 11/20/2024 ***WELL S/I ON ARRIVAL*** STBY FOR HIGH WINDS ***CONT ON WEATHER TICKET*** 11/21/2024 T/I/O=920/700/0 Temp=S/I (Assist SL with load and test CMIT-TxI) Pumped 10 bbls of crude down the TBG for load. Pumped a further 16 bbls of Crude down the TBG for Testing. CMIT-TxI *******Failed****** Pumped 9 bbls of Crude down the TBG/IA to reach a max applied psi of 2750. 1st 15 min TBG/IA lost 50/40, 2nd 15 min TBG/IA lost 50/10 psi for a total loss of 100/50 psi in a 30 min test. *****WSR continued on 11-22-2024***** 11/21/2024 ***WELL S/I ON ARRIVAL*** PULLED P-PRONG FROM 4-1/2" PX PLUG BODY @ 10681' MD PULLED 4-1/2" PX PLUG BODY FROM X-NIP @ 10681' MD BRUSHED 4-1/2" XN NIP @ 10702' MD SET 4-1/2'' x 2-3/8'' XN-NIP REDUCER @ 10702' MD RAN 4-1/2'' CHECKSET O XN-NIP REDUCER @ 10702' MD (Good) SET 1.875'' XN PLUG IN XN-NIP REDUCER @ 10702' MD PERFORM C-MIT (FAIL) ***WSR CONT. ON 11/22/2024*** 11/22/2024 ******WSR continued from 11-21-2024******* (TFS unit 1 assist S-Line with load and test CMIT-TxIA) CMIT-TxIA **********PASSED********** @ 2750 psi. Pumped 9 bbls of Crude down the TBG/IA to to reach a max applied psi of 2750 psi. 1st 15 min TBG/IA lost 50/50 psi, 2nd 15 min TBG/IA lost 25/0 psi for a total loss of 75/50 psi in a 30 min test. Bled TBG/IA down to 900 psi. Well left in S-Line control. Final WHPS 1100/850/0 Daily Report of Well Operations PBU S-23 Daily Report of Well Operations PBU S-23 11/22/2024 ***WSR CONT. FROM 11/21/2024*** T-BIRD PERFORMED PASSING CMIT-TxIA (see t-bird log) SET 4-1/2" WHIDDON CATCHER SUB ON 4-1/2" x 2-7/8" XN NIP REDUCER @ 10702' MD PULLED RA-DGLV FROM ST #1 @ 10589' MD PULLED RM-DGLV FROM ST #3 @ 8397' MD PULLED RM-DGLV FROM ST #5 @ 3165' MD SET RM-LGLV (16/64" ports, tro 1641 psi) IN ST #5 @ 3165' MD SET RM-LGLV (16/64" ports, tro 1613 psi) IN ST #3 @ 8397' MD SET RM-OGLV (24/64" orifice) IN ST #1 @ 10589' MD PULLED RM-EXT PKG DGLV FROM ST #4 @ 5919' MD (left as open pocket for poglm) PULLED 4-1/2" WHIDDON CATCHER SUB FROM TOP OF 4-1/2" x 2-7/8" XN NIP REDUCER @ 10702' MD (empty) ***WELL LEFT S/I ON DEPARTURE*** 12/7/2024 T/I/O = 720/330/VAC. Temp = SI. Displacing tubing, IA & OA w/ N2 (weld). ALP = 350 psi, SI @ CV. Strap conductor @ 7',3", no fluid. OA FL @ ~24'. Pressure OAP to 50 psi w/ N2. Leave N2 cap for 20 min. Bled OAP to BT to 5 psi in < 5 min. T & IA FL near surface. Bled TP & IAP slowly to BT to 650/150 psi in 2hr, 30 min. (gas/energized fluid, 5.66 bbls). U-Tube TxIA for 30 min. Equalized @ 570 psi. Bled TP & IAP slowly to BT to 300 psi in 2 hrs (gas/energized fluid, 0.5 bbls). Total BBLs = 6.1. Monitored for 30 min. TP increased 30 psi & T FL @ 210'. IAP increased 10 psi & IA FL @ 350'. Final WHPs = 330/310/5 SV, WV, SSV = C. MV = O. IA, OA = OTG. 19:30. 12/15/2024 T/I/O = 560/390/0+. Temp = SI. T/IA/OA FL (pre weld). ALP = 0 psi, SI @ CV. T FL @ 560' (1550' above SSSV Nip, 8.5 bbls). IA FL @ 250' (2915' above sta # 5 Dome, 13.4 bbls). OA FL @ 24'. SV, WV, SSV = C. MV = O. IA, OA = OTG. 11:30 1/9/2025 T/I/O = 580/420/3. Temp = SI. Bleed TP & IAP (pre load). ALP = 500 psi, SI @ CV. Temporary containment installed in cellar. T FL @ 590' (9 bbls). IA FL @ 260' (14 bbls). OA FL @ 70' (5 bbls). Bled ALP to 0 psi in 0 psi in 1.5 hrs. Bled IAP to 0 psi in 1.5 hrs (gas). Bled TP to 450 psi in 3 hrs (gas/energized fluid). Unable to bleed lower. IAP increased 10 psi. Monitored for 30 min. TP increased 60 psi, IAP increased 10 psi. Final WHPs = 510/20/3. SV, WV, SSV = C. MV = O. IA, OA = OTG. 05;00 1/9/2025 T/I/O= Load Tbg, IA, & OA with Diesel ( Pre Weld ) TxIA Comminication. Pumped 48 bbls diesel down TBG Bleed pressure off of TBG/IA both Fluid Packed. Pumped 3.6 bbls diesel down OA bleed OA down fluid packed. Secured well FWHP=90/90/8 ***Job Continued 1-10-25*** 1/10/2025 T/280/280/30. Temp = SI. Rock out diesel from T/IA/OA (pre weld). AL disconnected. Flooring removed, replaced with plywood over cellar. OA casing valves removed, integrols installed at 3:00 & 9:00. T FL @ surface. IA FL @ surface. Bled TP & IAP to BT to 50 psi, begin pushing N2 down tbg, taking fluid out IA, returning 7.2 bbls. U-tube TxIA for 30 minutes. Equalized @ 130 psi. T FL @ 70'. IA FL @ 40'. OA FL inconclusive ( unable to strap due to grease in OA). TP & IAP increased 60 psi throughout duration of job. Final WHPs = 190/190/0 SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30 Daily Report of Well Operations PBU S-23 1/10/2025 ***Job Continued from 1-9-25*** Rig Down 1/11/2025 T/I/O = SSV/290/0 Prep for Weld Repair Assist DHD and Worley welders with prep and RU Miller Pro Heat. OA fluid level is not low enough for pre-heat and welding. DHD unable to get hose down past possible grease plug. Plan to have full bore flush OA. Secure well and close out permits. 1/11/2025 T/I/O = SSV/290/0+. Temp = SI. Purge OA for weld. AL disconnected. Flooring removed, replaced with plywood over cellar. OA casing valves removed, integrals installed. Purged ~0.75 gals of fluid from OA. Strapped OA at ~16" (1" below lowest future weld, need 12"). Held up by apparent grease bridge. Hot oil ordered to flush grease out. Final WHPs = SSV/290/0 SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30 1/11/2025 T/I/O=287/293/9 ( PATCH TBG / LINER ) Artic Pack Flush. Pressured up OA and bleed off multiple times see Log for details. *** Job Continued 1-12-25 *** 1/12/2025 T/I/O = 290/290/10 Prep for Weld Repair Assist DHD and Worley welders to prep for weld and RU Miller Pro Heat. OA fluid level evacuated to 3' below bottom weld area. Bleed IC-PO and tubing hanger test voids and blow them out with air to remove as much hyd fluid as possible. Miller pro heat wrapped and tested good in preparation for pre-heat to 550 deg F and weld repair tomorrow morning. 1/12/2025 T/I/O = 290/290/10. Temp = SI. Valve grease OA flush, purge OA for weld. AL disconnected. Flooring removed, replaced with plywood over cellar. OA casing valves removed, integral & 2" hardline installed. LRS purged diesel through OA to AP tank. Pressured OA in intervals dumping pressure each time from 100 psi to 500 psi. Bled OAP to 0 psi. Purged fluid from OA to ~3' bleow lowest weld. Purged OA with N2 & held N2 sweep while welders tack weld heat pad into place (5 bottles used, 11 full) . Job prepped for welding to commence in the morning. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 1/12/2025 *** Job Continued from 1-11-25 *** ( PATCH TUBING / LINER ) Rig Down Secure well FWHP=289/298/450. 1/13/2025 T/I/O = 290/290/35 Weld Repair Assist DHD and Worley welders, begin pre-heat, temps at 550 for 1 hour and then Miller Pro Heat control unit had electrical issue, shut down MPH, standby for second control unit to be delivered and swapped and pre-heat started again. Temp at 550 for 1.5 hours, temps dropped to 450, thermal expansion brought OA fluid level back up to surface. Shut down pre-heat. Discussion with town, release Worley welders, DHD monitor OA with open bleed, standby for OA fluid level to be lowered. 1/13/2025 T/I/O = 290/290/0+. Temp = SI. Purge OA for weld (weld). AL disconnected. Flooring removed, replaced with plywood over cellar. OA casing valves removed, integral & 2" hardline installed. Began N2 sweep, welders began preheating starting head. Starting head reached 550° then fell 100°. Fluid to surface due to thermal expansion, welders shut down heating. Held open bleed for ~1 hr. OA went on VAC as well cooled down. Shut in N2 bleed. Disconnected heater and open doors to cool wellhead. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30 Daily Report of Well Operations PBU S-23 1/14/2025 T/I/O = 290/290/0+. Temp = SI. Purge OA for weld (weld). AL disconnected. Flooring removed, replaced with plywood over cellar. OA casing valves removed, integral & 2" hardline installed. Strapped OA fluid @ ~1' from lowest weld. Purged ~5 gallons of fluid from OA. OA strapped @ ~4' from lowest weld, tagged solid, unable to get deeper. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 1/16/2025 T/I/O = 290/290/0+. Temp = SI. Purge OA for weld (weld). AL disconnected. Flooring removed, replaced with plywood over cellar. OA casing valves removed, integral & 2" hardline installed. Attempted to sweep fluid from OA w/ N2, no fluid evacuated after multiple attempts. OA strapped @ ~4' from lowest weld, tagged solid, unable to get deeper. Job prepped for braiden head heating in the morning. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:00 1/17/2025 T/I/O = 300/300/10 Purge OA w/N2 (assist welders). Welders heating WH to 550 ° F. Holding constant flow of N2 through OA to OT until WH cools to below 185°. Left a 10 psi cap of N2 on OA upon departure. Final WHPs = 300/300/10. SV, WV, SSV = C. MV = O. IA, OA = OTG. 18:00 1/18/2025 T/I/O = 300/300/10 Purge OA w/N2 (assist welders). Welders heating WH to 550 ° F and welded uper and lower collar on Braden head. Held constant flow of N2 through OA to OT until WH cools to below 185°. Left a 10 psi cap of N2 on OA upon departure. Final WHPs = 300/300/10. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 1/18/2025 T/I/O = 300/300/0 Weld Casing head to 13-3/8 casing - Weld 13-3/8 casing pup to collar. Pre & post heat with Miller pro heat induction heater. Final WHP's 300/300/0 1/19/2025 T/I/O = SSV/310/0+. Temp =SI. MIT-OA to 1200 psi w/N2 **PASS**. AL disconnected. Flooring removed, replaced with plywood over cellar. OA casing valves removed, integral & 2" hardline installed. Performed MIT-OA w/ N2 to 1200 psi, lost 38 psi in 1st 15 min, lost 16 psi in 2nd 15 min for a PASS. Bled OAP to 0 psi. IAP decreased 10 psi. Left heater in wellhouse, backdoor left chained open. Final WHPs = SSV/300/0+. SV, WV, SSV = C. MV = O. IA, OA = OTG. 11:00 1/19/2025 T/I/O = 300/300/0 MPI weld repair (pass) - Rig down miller pro heat machine. Final WHP's T/I/O = 300/300/0 1/20/2025 Installed OA and OA companion blind, VR Profiles full of cement (Could not install VR plugs), Torqued flanges to API Spec. 2/1/2025 ***WELL SI ON ARRIVAL*** (SET LOWER POGLM PACKER) INITIAL T/I/O: 300/300/0 PT 300/2500PSI LOG CORRELATED TO 4.5" TUBING TALLY RUN NS 450-368 MONO-PAK L-80 LOWER POGLM PACKER. ME SET DEPTH: 5950' CCL STOP: 5940.7' CCL-ME: 9.3' ***JOB COMPLETE*** Daily Report of Well Operations PBU S-23 2/5/2025 (Assist Slickline) TFS U4, Assist with MIT-T on patch and gas lift mandrel, Initial WHP T/IA/OA= 400/300/0, Target for MIT-T 2500 psi with MAP of 2750, pumped crude down tubing took 4 bbls to reach MAP of 2750, First 15 minutes TBG lost 270 psi, Second 15 TBG lost 280 psi and IA came up 25 psi, Pressured back up to MAP of 2750 for second MIT-T, Took 1 bbls crude to reach MAP of 2750, First 15 TBG lost 150 psi, Second 15 TBG lost 300 psi while IA stayed at 350 psi for duration of test, bled pressure off for SL to go in hole, **** Job postponed due to weather**** 2/5/2025 ***WELL S/I ON ARRIVAL*** SET 450-368 NS MONO-PAK UPPER POGLM STRADDLE PACKER@ 5914' MD to mid element (2-3/8" spacer pipe & gaslift mandrel w/ bk-dglv installed, id=1.905", 36.60' lih) IN LOWER ANCHOR @ 5,950' MD THUNDERBIRD PERFORMED 2 FAILING MIT-T'S TO 2,500 PSI LAY DOWN EQUIPMENT (phase weather coming) ***POLLARD 59 ON WEATHER HOLD (high winds)*** 2/6/2025 ***OFF WEATHER HOLD, BACK ON WSR FOR S-23 FROM 2-5-25*** T-BIRD ATTEMPTED MIT-T TO 2500 psi w/ MAX APPLIED TO 2750 psi (fail see t- bird log) T-BIRD ATTEMPTED CMIT TO 2,500 PSI (fail) RE-ATTEMPTED MIT-T W/ SAME RESULTS 2 ATTEMPTS TO PULL 2-3/8" XXN PLUG FROM 10,702' MD MADE 2 x 1-3/4" PUMP BAILER TO PLUG @ 10,702' MD (recovered ~2 cups of hard packed frac sand) SET 4-1/2" CAT w/ 3" SEALS IN TOP OF 450-368 POGLM STRADDLE @ 5917' SLM T-BIRD ATTEMPTED MIT-T TO 2500 AGAINST CAT (pass, see t-bird log) PULL 4-1/2" CAT FROM TOP OF 450-368 POGLM STRADDLE @ 5917' SLM T-BIRD ATTEMPTED MIT-T TO 2500 (fail) ***WSR CONTINUED ON 2-7-25*** 2/6/2025 T/I/O=269/300/0 (Assist Slickline W/pressure test) TFS U4. Pumped 2.6 bbls of crude down the TBG to attempt a pressure test @ 2750 psi MAP. Reached test pressure @ 2748 psi TBG, 348 psi IA. First 15 minutes TBG lost 341 psi, IA lost 2 psi. Second 15 mintutes TBG lost 263 psi, IA lost 0 psi. Hooked up jumper hose to IA and equalized pressure from TBG to IA. Pumped 13 bbls of crude down the TBG and IA to Pressure test both strings for a CMIT-TxIA. Reached test pressure @ 2696 psi TBG, 2742 psi IA. First 15 minutes TBG lost 83 psi, IA lost 82 psi. Second 15 minutes TBG lost 69 psi, IA lost 73 psi ***CMIT-TxIA FAILED***. Pumped 1 bbl of crude down the TBG for second test against TBG only. Reached test pressure @ 2742 psi TBG, 472 IA. First 15 minutes TBG lost 409 psi, IA gained 25 psi. Second 15 TBG lost 303 psi, IA gained 16 psi. Pumped 1.7 bbls of crude down the TBG for a pressure test against CSV set by slickline. Reached test pressure @ 2750 psi TBG, 337 psi IA. First 15 minutes TBG lost 93 psi, IA lost 8 psi. Second 15 minutes TBG lost 28 psi, IA lost 8 psi, Test passed. Bled back 1.7 bbls for Slickline to pull CSV. Pumped 3 bbls of crude down the TBG to test after pulling CSV. Reached test pressure @ 2746 psi TBG, 350 psi IA. First 15 minutes TBG lost 343 psi, IA gained 23 psi. Second 15 minutes TBG lost 273 psi, IA gained 6 psi *Job continues to 2-7-25* Daily Report of Well Operations PBU S-23 2/7/2025 *Job continues from 2-6-25* (Assist Slickline, MIT-T) TFS U4. Pumped 16 bbls of crude down the TBG to flush and assist SL in settings plug. Pumped 4 bbls of crude down the TBG to pressure up for an MIT-T MAP @ 2750 psi. Reached test pressure at 2741 psi TBG and 336 psi IA. First 15 minutes TBG lost 180 psi, IA gained 19 psi. Second 15 minutes TBG lost 106 psi, IA gained 12 psi. ***MIT-T FAILED***. Established LLR @ .023 BPM @ 2750 psi. Attempted to Bleed down TBG to 0 psi. Unable to achieve lower than 264 psi. Took back 32 bbls. Pumped 14 bbls of crude down the TBG to attempt another MIT-T MAP @ 2750 psi. Reached test pressure at 2750 psi TBG, 91 PSI IA. First 15 minutes TBG lost 161 psi, IA gained 5 PSI. Second 15 minutes TBG lost 110 psi, IA gained 4 PSI. ***MIT-T FAILED***. Continued watching pressure for another 30 minutes with average losses of ~100 psi. Bled back 3 bbls to bring TBG to 800 psi. Well left in control of slickline upon departure. Tags hung on IA and master for tests FWHPS=804/110/0 IA/OA=OTG SV/WV/SSV=C MV=O 2/7/2025 ***WSR CONTINUED FROM 2-6-25*** RAN KJ, 1-3/4" P. BAILER (msfb). S/D @ 10714' SLM (recovered ~1 cup of hard packed frac sand, metal marks on blr bottom) MADE ATTEMPT TO EQ/PULL 1.875" XXN PLUG FROM 10702' MD RAN 1.75" HYDROSTATIC BAILER TO 10,714' SLM, RECOVERED ~1-1/2 CUPS OF HARD PACKED CARBOLITE PULLED 1.875" XXN PLUG FROM 10,702' MD, PLUG PACKED OFF W/ FRAC SAND, PACKING & O-RINGS LOOK GOOD SET 1.875" XXN PLUG (on seat, 14" fill ext, 36" lih, 4 x 3/16" ports) IN NIPPLE REDUCER @ 10,702' MD T-BIRD PERFORMED A FAILING MIT-T TO 2,500 PSI T-BIRD BLED BACK TBG & ATTEMPTED MIT-T TO 2500 (fail) ***WSR CONT ON 2-8-25*** 2/8/2025 ***WSR CONTINUED FROM 2-7-25*** RIG DOWN POL 59 ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** 2/20/2025 T/I/O = SSV/340/5. Temp = SI. Bleed IAP (pre E-Line LDL). ALP = 0 psi, AL SI @ CV. IA FL @ 120' (6.5 bbls). Bled IAP to BT (gas) from 340 psi to 90 psi in 30 min. SI bleed, fluid @ surface. Monitor for 30 min. IAP increased 30 psi. FWHPs = SSV/120/5 SV/WV/SSV = C. MV = O. IA, OA = OTG. 13:00 2/21/2025 ***WELL S/I ON ARRIVAL*** ( LEAK DETECTION LOG IN PROGRESS) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH RIH TO LOG BASE LINE, SAT DOWN UNABLE TO GET THROUGH POGLM TAG AT 5940' MD, RIG DOWN ***WELL S/I ON DEPARTURE*** 2/21/2025 T/I/O= 531/130/1. LRS 72 Assist E-Line with LDL (PATCH TUBING / LINER). E/L could not get down the TBG so job cancelled. Daily Report of Well Operations PBU S-23 4/16/2025 ***WELL S/I ON ARRIVAL*** RAN 2 3/8" BRUSH AND 1.75" SAMPLE BAILER. S/D IN POGLM @ 5928' SLM. BRUSH POGLM UNTIL NO LONGER SITTING DOWN. RAN 10' x 1.875" STEM W/ 1.5" BULLNOSE. DRIFT CLEANLY THROUGH POGLM TO TAG PLUG @ 10,702' MD. RAN HES 24 ARM CALIPER FROM 10,710' SLM TO SURFACE, GOOD DATA ***WELL S/I ON DEPARTURE*** 6/27/2025 ***WELL S/I ON ARRIVAL*** DRIFTED W/ 20' x 1.75" BAILER. NO ISSUES THROUGH POGLM @ 5,914' MD. CONTINUED DRIFT TO NIPPLE REDUCER & PLUG @ 10,702' MD W/ NO ISSUE ***WELL LEFT S/I ON DEPARTURE*** 7/2/2025 T/I/O= 752/365/3 (PATCH TUBING/LINER) Assist E-Line. Pumped 6.1 bbls diesel into TBG to pressure to 2500 psi. Monitored pressure for 5 min intervals and calculated LLR 0.84 gpm/ 0.02 bpm. Pumped 9.6 bbls diesel holding 2500 psi on TBG. 7/2/2025 ***WELL SI ON ARRIVAL*** (LDL) MIRU YELLOWJACKET E-LINE PT PCE 300PSI LOW, 3000PSI HIGH. FUNCTION TEST WLVS RIH WITH READ ARCHER ACOUSTIC LDL TOOLSTRING AND CORRELATE TO WELL SCAMATIC LOG BASELINE PASS TO 10697', INITIATE LEAK, T/I/O 760/365/0 LEAK FOUND AT 10629' IN THE PACKER RDMO YELLOWJACKET E-LINE *** WELL SI ON DEPARTURE*** JOB COMPLETE 9/4/2025 T/I/O=703/350/0 Job Objective: Confirm IA stabilization. Verify IA was Fluid packed, Bled IA from 350 psi to 283 psi went to fluid. Pumped 2.9 bbls down tubing to pressure up to 2750 and maintained tubing pressure between 2500- 2750 with 0.9 bbl total over the 3.5-hour test. IA increased to 356 psi and slowly climbed to ~420 where it remained stable for 2.5 hours. Bled tbg to staring pressure. FWHP=705/348/2 Well secured, DSO notified upon departure. 9/21/2025 *** WELL S/I ON ARRIVAL *** BAIL FORMATION SAND FROM TOP OF PLUG @ 10,702 MD. JOB IN PROGRESS **** WSR CONT ON 09/22/25 **** 9/22/2025 **** WSR CONT FROM 9/21/2025 **** **** WELL CONTROL DRILL W/ WSL **** RAN 2 3/8" DOGLESS GS TO 1.875" XN PLUG IN NR @ 10,702' MD (sheared). PULLED 1.875" XN PLUG FROM NR @ 10,702' MD (1/2 cup sand/carbolite in fill extension). *** JOB COMPLETE, WELL S/I ON DEPARTURE *** 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU S-23 Weld Starting Head Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 190-127 50-029-22088-00-00 341J ADL0028257, 0028258 11634 Conductor Surface Intermediate Production Liner 9224 80 2669 10899 932 10681 20" 13-3/8" 9-5/8" 7" 8560 34 - 113 33 - 2702 29 - 10928 10692 - 11624 2375 34 - 113 33 - 2702 29 - 8732 8567 - 9217 Unknown, 11582 2260 4760 7020 10681 5020 6870 8160 10949 - 11408 4-1/2" 12.6# L-80 27 - 107148746 - 9067 Structural 4-1/2" Baker F-1 Packer No SSSV Installed 10625, 8522 Date: Torin Roschinger Operations Manager Alex Vaughan alex.vaughan@hilcorp.com 907-564-5258 PRUDHOE BAY 9/1/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 8:41 am, Aug 19, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.08.16 21:15:44 - 08'00' Torin Roschinger (4662) 324-474 SFD 8/19/2024 DSR-8/21/24 10-404 MGR12SEP24*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.09.13 21:04:11 -04'00'09/13/24 RBDMS JSB 091724 SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 Well Name:S-23 Permit to Drill:190-127 Current Status:Not Operable, PAL API Number:50-029-22088-00 Estimated Start Date:September 1st 2024 Estimated Duration:10 days Regulatory Contact:Abbie Barker Revision:0 First Call Engineer:Alex Vaughan (907) 564-5258 (O)(907) 748-5478 (M) Current Bottom Hole Pressure:3250 psi (average Ivishak) 7.14 ppg | PPFG at top perf Max Anticipated Surface Pressure:2,375 psi (Based on 0.1 psi/ft gas gradient) Last SI WHP:1500 psi Sep 7 th, 2021 Min ID:3.725” @ 10,702’ MD XN-Nipple Max Angle:51 deg @ 5,301’ MD Last Tag:PXN plug in XN @ 10,702’ MD Brief Well Summary: S-23 is an Ivishak and Sag artificial lift producer that has been shut in since June 2023 Current Status: NotOperable - PAL. Currently shut in due to TxIA communication through GLM #4 and leaking wellhead starting head flange. Objective: - Repair starting head to address observable hydraulic leak - Install POGLM to address logged tubing to inner annulus communication at GLM #4 WBL Steps: 1 FB Perform CMIT to confirm well envelope hydraulic competency 2 DHD Repair Starting Head 3 SL Pull PXN from XN-Nipple 4 SL Install nipple reducer with 2-3/8 XN plug and pressure test 5 FB Perform CMIT to confirm nipple reducer hydraulic competency 6 SL Install gas lift valves in GLM #1,2,3,5 7 EL Set POGLMacross GLM#4 8 FB Perform MIT-T to confirm POGLM and OV hydraulic competency 9 SL Pull 2-3/8 XN plug from nipple reducer Procedural Steps: Fullbore 1. Perform CMIT to confirm hydraulic competency of 9-5/8” casing and tubing packer x Target pressure of 2500 psi w/ max pressure 2750 psi Wellhead repair 1. Repair leaking starting head adapter to restore outer annulus well integrity a. Nitrogen purge surface casing as per welding service company requirements b. Heat soak relevant section of wellhead and surface casing as per welding service company requirements c. Weld repair starting head to close hydraulic leak path d. Perform NDE of weld to confirm weld suitability Slickline 1. Drift to PXN plug is recommended but, at supervisors discretion x Last tubing entry was June 28, 2023 for MFC log and well has been shut in since. POGLM SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 x Successful 1500psi CMIT on June 27, 2023 2. Pull PXN plug at 10,681’ SLMD located in XN-nipple 10,702’ MD x PXN plug installed June 26, 2023 3. Install 4-1/2” x 2-3/8” XN-nipple reducer at 10,702’ MD 4. Set 2-3/8” XXN plug in nipple reducer 5. Set valve catcher on XXN plug Fullbore 1. Perform CMIT to confirm nipple reducer hydraulic competency x Target pressure of 2500 psi w/ max pressure 2750 psi Slickline 1. Replace gas lift valves in GLM# 1, 2, 3, 5 as per ALS model 2. Pull valve catcher from XXN plug in nipple reducer E-Line 1. Set POGLMacross GLM #4 at 5919’ MD per tie-in log x Confirm completion equipment that arrives on location has drift capacity to pull 2-3/8” XXN plug through entire assembly. i. 2-3/8” GLM Drift: 1.901” ii. 2-3/8” XN seal bore: 1.875” x Consider removal of snap latch if lubricator length allows single run option. x First run: Install lower tubing patch packer with snap latch profile i. Baker 10 setting tool x Second run: Install upper tubing patch packer, 2-3/8” GLM, and snap latch i. Snap into lower tubing patch packer and pull tension to confirm ii. Baker 10 setting tool x Locate top slip/element at: 5914’MD i. Center of pup above GLM #4 x Locate bottom slip /element: 5943’-5973’ MD i. Range provided is 5’ inside range 3 joint below GLM #4 ii. Selection of bottom slip / element location dependent on maximizing lubricator length available. x Note: Full joint directly above GLM #4 is reported as 57.97% damage per HAL MFC log and should not be used to set tubing patch upper slip/element in. x Note: Pup below GLM #4 is indeterminately close to identified leak location via LDL log and should not be used to set tubing patch bottom slip/element in. SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 ôIJťôŘĺċϙťĺŕŜīĖŕϯôīôıôIJťϙīĺèÍťôîĖIJϙèôIJťôŘϙĺċϙŕŪŕÍæĺŽôϙ@[aϙϭ͓ôIJťôŘĺċϙæĺťťĺıŜīĖŕϯôīôıôIJťϙīĺèÍťôîĖIJϙċŪīīϙĤĺĖIJťϙæôīĺſϙ@[aϭ͓ϙÍťϙīôÍŜťϙ͔ċťϙÍſÍƅċŘĺıϙÍϙèĺIJIJôèťĖĺIJ SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 Fullbore 1. Perform MIT-T to confirm hydraulic competency of tubing patch and gas lift valve installation x Target pressure of 2500 psi w/ max pressure 2750 psi Slickline 1. Pull 2-3/8” XXN plug from 4-1/2” x 2-3/8” nipple reducer Attachments x Current Wellbore Schematic x Reference Leak Detection Log x Relevent Section of Leak Detection Log x Reference Multi Finger Caliper Log x Relevent Section of Multi Finger Caliper Log: x Sundry Change Form SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 Current Wellbore Schematic: SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 Proposed Wellbore Schematic SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 Reference Leak Detection Log: SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 Relevent Section of Leak Detection Log: SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 Reference Multi Finger Caliper Log SH Repair & Tubing Patch Well: S-23 PTD: 190-127 API: 50-029-22088-00 Relevent Section of Multi Finger Caliper Log Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: August 16, 2024Subject: Changes to Approved Sundry Procedure for Well S-23Sundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:190-127 6.50-029-22088-00-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 11634 11582 9188 10625 None 8521 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 79 20" 34 - 113 34 - 113 Surface 2669 13-3/8" 33 - 2702 33 - 2702 5020 2260 Intermediate 10899 9-5/8" 29 - 10928 29 - 8732 6870 4760 Production Perforation Depth: Measured depth: 10949 - 11408 feet True vertical depth:8746 - 9067 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 27 - 10741 28 - 8601 10625 8521Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker F-1 Packer Liner 932 7" 10692 - 11624 8567 - 9217 7240 / 8180 5410 / 7020 12. Stimulation or cement squeeze summary: Intervals treated (measured): 1st Stage - Slowly pump cement into OA valve while taking returns from OA companion side to half drum. Fluid level @ 60' before starting. Fill up volume is 3.6 bbls. Hesitate and pump to allow cement and diesel to swap out. 10 bbls away over 5 hrs and still have dirty returns after each 30 min hesitation. Decide to let cement set and will return 3-4 days to attempt to sqz starting head leak. 2nd Stage - Drop gel pill in OA then pump 5 bbls of 14.0 ppg SqueezeCrete cement. Pressure up to 1200 psi in 300 psi steps. Held 1200 psi for one hour. No visible leaks on starting head Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 21818002524121 2572200 1262 1220 508 379 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Aras Worthington aras.worthington@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:(907)564-4763 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9224 Sundry Number or N/A if C.O. Exempt: 320-005 No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Starting Head Squeeze Operations shutdown … Change Approved Program 5 Surface - ~100' Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well5 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028257 & 028258 PBU S-23 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Unknown x5, 11582 By Samantha Carlisle at 1:01 pm, Oct 20, 2020 Digitally signed by Stan Golis DN: cn=Stan Golis, ou=Users Date: 2020.10.20 12:38:30 - 08'00' Stan Golis DSR-10/20/2020MGR22OCT2020 RBDMS HEW 11/10/2020 SFD 10/20/2020 ACTIVITY DATE SUMMARY 5/13/2020 T/I/O = SI/300/0. Remove OA working side 2" valve and companion side 2" blind flange. Removed 2" VR plug from companion side. DHD strapped OA. Install 2" integrol flanges on both sides and torque to API specs. Install Block valves and 1502 caps. RDMO ***Job Complete*** SEE LOG FOR DETAILS Final T/I/O = SI/300/0. IA/OA = OTG Note: Valve and blind left in well house. Will need to bring out 2" Tapped blind flange for re-install 5/13/2020 T/I/O = SI/300/0. Temp = SI. Strap TOC & FL on OA. ALP = 0 psi. SI @ CV. Strapped 200' to TOC. Strapped 60' to FL. Valve Crew in control of well on departure. 13:00 5/18/2020 Job Scope: OA Cement Squeeze to repair starting head leak. Slowly pump cement into OA valve while taking reurns from OA companion side to half drum. Fluid level @ 60' before starting. Fill up volume is 3.6 bbls. hesitate and pump to allow cement and diesel to swap out. 10 bbls away over 5 hrs and still have dirty returns after each 30 min hesitation. Decide to let cement set and will retun 3-4 days to attempt to sqz starting head leak ***to be continued*** 5/22/2020 T/I/O = SSV/340/0. Temp = SI. Strap TOC in OA (OA dwnsqz). ALP = 0 psi, SI at mod and CV. Maintained open bleed on OA for 1 hr. Pulled block valves from OA. Strapped OA to TOC @ 215' (12.84 bbls). Reinstalled block valves. FWHPs = SSV/340/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:45 5/26/2020 Objective: Repair leak at starting head .Scope of activity: Reverse out fluid from OA objective depth of ~200'. Was able to get 75 ' down and recover 3.64 bbls of fluid (Crude). See Log for details. ...job in progress... 6/5/2020 Job Scope: Remove 3/8" hose form OA (pre cement). Removed 75' of 3/8" HP hose from OA, hose mostly dry coming out chain on bottom of the hose was wet. OA FL @ ~100'. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 6/28/2020 Objective: Repair leak at starting head. Scope of activity: Drop gel pill in OA then pump 5 bbls of 14.0 ppg SqueezeCrete cement. Pressure up to 1200 psi in 300 psi steps. Held 1200 psi for one hour. No visible leaks on starting head or exposed collar in cellar. After one hour total loss was 110 psi. Bled OA to zero. Tags hung. Pad Op notified. ***Job Complete*** 7/2/2020 RD Intergal and block valve from working OA, Install gate valve and blind flange to working OA. RD intergal and block from Comp OA, Install tapped blind w/ alemite fitting to Comp OA. RDMO. 10/3/2020 ***WELL S/I ON ARRIVAL*** SET 4-1/2" WHIDDON CATCHER SUB @ 10,668' SLM PULLED RM-FLOWSLEEVE FROM ST #2 @ 10,403' MD ***CONT JOB ON 10/4/20 WSR*** 10/4/2020 ***CONT JOB FROM 10/3/20 WSR*** PULLED RM-DGLV FROM ST #4 @ 5919' MD. PULLED RM-DGLV FROM ST #5 @ 3165' MD. SET RM-LGLV IN ST #5 @ 3165' MD. ***CONT JOB ON 10/5/20 WSR*** 10/4/2020 LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Begin WSR 10/4/20, Spot on Edge of Pad, SB for Slickline Operations, Begin STBY for Scheduling. Inlet Well S-23, Outlet Well S-19. Job in Progress, Continue on WSR 10/5/20 Daily Report of Well Operations PBU S-23 Daily Report of Well Operations PBU S-23 10/5/2020 LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/4/20. Continue STBY for Scheduling. Inlet Well S-23, Outlet Well S-19. Job in Progress, Continue on WSR 10/6/20 10/5/2020 ***CONT JOB FROM 10/4/20 WSR*** ATTEMPT TO RECOVER DROPPED VALVE FROM ST #2 RECOVERED DROPPED RM-OGLV FROM ST#2 @ 10,403' MD. SET RM-OGLV(20/64") IN ST#4 @ 5919' MD. SET RM-DGLV IN ST#2 @ 10,403' MD. ***JOB CONT'D ON 10/06/20 WSR*** 10/6/2020 LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/5/20. Complete STBY for Scheduling, Perform Unit Move, Rig Up. Inlet Well S-23, Outlet Well S- 19. Job in Progress, Continue on WSR 10/7/20 10/6/2020 ***CONT'D FROM 10/05/20 WSR*** PULLED 4-1/2" WHIDDON CATCHER SUB FROM 10,681' SLM.(empty) PULLED 4-1/2" PX-PLUG FROM X-NIPPLE @ 10,681' MD. ***WELL S/I ON DEPARTURE, PAD-OP NOTIFIED OF STATUS*** 10/7/2020 LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/6/20. Complete Rig Up, PT, POP Well, Initiate GL, Pumping MeOH Pills as needed, Continue to Flow/ Stabilize Well. Inlet Well S-23, Outlet Well S-19. Job in Progress, Continue on WSR 10/8/20 10/8/2020 LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/7/20. Continue Flow/ Stabilize Well, DHD on Location/ Fluid Level @ SO, PCC increased GLR/ Valve @ 35%. Continue to Flow/ Stabilize Well. Inlet Well S-23, Outlet Well S-19. Job in Progress, Continue on WSR 10/9/20 10/8/2020 T/I/O = 230/1420/600. Temp = 68°. IA FL (Testers req). AL SI @ CV. PB GL rigged to IA is online. IA FL @ 5919' (#4 SO, 317 bbls). Testers in control of well upon departure. 09:15 10/9/2020 LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/8/20. Perform 12 Hr Well Test, Continue Flowback. Inlet Well S-23, Outlet Well S-19. Job in Progress, Continue on WSR 10/10/20 10/10/2020 LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/9/20. Perform 12 Hr Well Test, Reduced GLR to 2.0mmscf/d, PCC Diverted Well into WPS, Continue Flowback. Inlet Well S-23, Outlet Well S-19. Job in Progress, Continue on WSR 10/11/20 10/11/2020 LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/10/20. Perform 4 Hr Purge, Perform 12 Hr Piggyback Test, Begin RDMO. Inlet Well S-23, Outlet Well S-19. Job Complete/ End WSR 10/12/2020 T/I/O = SSV/1620/Vac. Temp = SI. WHPs (Eval SH leak). AL SI & blinded @ casing valve (40 psi). Poor boy AL rigged up to companion side IA valve (#19 AL, 1740 psi). Crude has seeped from the upper SH from the 2 to 4 o'clock positions (could not tell how old seepage is, cleaned SH before departure). Well has a sombrero liner installed with a minor amount of crude sepage in it. SV. WV, SSV = C. MV = O. IA, OA = OTG. 11:00 10/13/2020 T/I/O = SSV/1620/Vac. Temp = SI. WHPs (Eval SC leak). AL SI @ blinded @ casing valve (40 psi). Poor boy AL rigged up to companion side IA (#19 AL, 1740 psi, S/I). No new seepage on starting head. Well has a sombrero liner installed. SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:15 10/14/2020 T/I/O = 1550/1550/VAC. Temp = SI. WHPs & T FL (eval SC leak). AL blined @ CV. T FL @ 6180' (4071' below SSSVN). SV, WV, SSV = C. MV = O. IA, OA = OTG. 22:30 Daily Report of Well Operations PBU S-23 10/16/2020 T/I/O = SSV/1550/VAC. Temp = SI. WHPs (eval SC leak). AL blined @ CV. Temporary liner installed in cellar. No new seepage detected. WHPs unchanged overnight. SV, WV, SSV = C. MV = O. IA, OA = OTG. 00:30 THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Aras Worthington Interventions and Integrity Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU S-23 Permit to Drill Number: 190-127 Sundry Number: 320-005 Dear Mr. Worthington: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.clogcc.daska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, J re . P e Chair DATED this 15 day of January, 2020. RBDMSL5�-' SAN 15 2020 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 JAN 0 6 2020 pTs r(13/zo 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well m Oper ti uglriw Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Rednll ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other OA Squeeze 0 . 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0- 5. Permit to Drill Number: 190-127 3, Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-22088-00-00 7. If perforating: What Regulation or Conservation Order governs well spacing in this pool? 8. Well Name and Number: Will planned perforations require a spacing exception? Yes ❑ No El PBU 5-23 ` 9. Property Designation (Lease Number): 10. Field/Pools- ADL 0282574& 028258 ' PRUDHOE BAY. PRUDHOE OIL - 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 11634 9224 10681 8560 10681 Unknown x5,11582 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 34-113 34-113 Surface 2669 13-3/8" 33-2702 33-2702 5020 2260 Intermediate 1 10899 9-5/8" 1 29-10928 1 29-8732 1 6870 1 4760 Production Liner 1 932 7" 10692 - 11624 8567 - 9217 7240 / 8180 5410 / 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10949 - 11408 8746-9067 4-1 /2" 12.8# L-80 1 27-10741 Packers and SSSV Type: 4-1/2" Baker Packer Packers and SSSV MD (ft) and TVD (ft): 10625/8522 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary 9 Wellbore Schematic 21 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development m Service ❑ 14. Estimated Date for Commencing Operations: January 10, 2020 15. Well Status after proposed work: Oil EI WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ IT I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Worthington, Ares J be deviated from without prior written approval. Contact Email: Aras.Worthingtonabp.com Authorized Name: Worthington, Aras J Contact Phone: +1 907 564 4102 Authorized Title: Interyenjilio & Integrit ngineer Authorized Signature: Date: //3 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: _ �� Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: 46DMS 4" r/JAN 1 51010 Post Initial Injection MIT Regd? Yes ❑ No ❑ Spacing Ex\ptonquired? Yes ❑ No lid Subsequent Form Required: 1Q - yoy Approved bCOMMISSIONER COMMISSIONAPPROVEDBDate Date: i ) i J /f �J ME 9 Form 10-403 Revised 04/2017 ORIGINAL Submit Form antl Approved application is valid for 12 months from the date of approval. Attachments in Duplicate S-23 OA Cement Squeeze Intervention Engineer Aras Worthington (907) 564-4102 Production Engineer Samuel Infanti (907) 564-5676 Expected Start Date: January 1011 2020 History S-23 was a producer on artificial lift. The OA shoe was downsqueezed with cement in 2003 with the TOC displaced to —2000' MD. The well developed a starting head leak which was diagnosed in 2014 during an MITOA. Current Status The well is classified as "Not Operable" by BP and is secured with a tubing tail plug with a passing CMIT TAA to 3000 psi. Objective Pump sealant down the OA into the starting head leak and squeeze the leak. Procedural steps DHD/Special projects 1. Pump sealant (squeezecrete, Well Lock, or similar product) into the OA. 2. Squeeze sealant into the starting head leak. 3. Wait on sealant to cure. DHD/Well Integrity Engineer 1. POP well Under -Evaluation and monitor starting head for any leakage. 2. If there is no leakage, convert well to Operable status. T1*E- 4-1116"QW V1Hl7EAIf FMC AC"TC R- .. OTB 443 SCV-_ -845E 6F. UXV - 3s. f3' I(OP 3185 Lt3x Angle = 51• 53419" Mum ATS- 11120' vatum TV0- 6"35 13 38" CSO, 885, N17 80. U Minimum 10 = 3.126" @ 10702' 4-1P2" OTIS XN NIPPLE 4-117" 7n0, 1260, 1 "80 Tho, ,0152 6P1, 17 - 31h8" fb-118' C:G, 47a: NT moi_ WOW PFJdMAATION Sl.SM1RY WF LOG. Mm 1�9TV ON 10110190 AWO FATTOP SFT 4V0 10449` . Note. Wer m Pmduc&m 06 "or Mtomal pert data SLOE SFF Nf6ttVAL rJSOz ,`"4107 1 SOS ' 3-M" 4 10949-11019 0 01tf19193 07151 G 3378" 10 11165 - 11172 O 1120191 E -Ul" 6 11182 -11210 Q 11/01191 O1N'l 4 11182-112% 0 11f03790 09/30/15 ..338- 4 19304 11&54 O 11I03f80 OT13 3-3.18" 4 11384 - 11386 4 1113196 09130715 ' 3-3+0" 4 11396 - 11408 O 11/03/90 0715 WSL MA - 0V.W5 t' t f,V, 261 ASOTrAS, OTBI Cpl, 13=8.276" 11506' LF871O 11882'-. t Wk 29k _I -AO RTS6 6371 hof. 1) - 6 194-J-t�-11624' ... S � SAFETY 40TES N01I Y G( OFANY W571. OPEPAn0N WtICUOOUIOINGR4A&I t i OW OR T7a )WN RA 15'fi Ou TO r SIQO R-OWLINLrP0'TENTIAl 131051411. GAS LFT wNrm S I UAKETI MC AN" OR C -� 3A96� io&W i #g-t;,A•; a1,r Bwx :7<Tt, ID ='59F 76738' ._31--C1.M6 TT L00Oi561N5�9L7 19108' 7'Ab1F3187 JO14T r ?? ii FiSFi POS OOVtAsPRT�K'CBYTRALQSt L J� AFAd {015031145 I �� !.-?Lbn rx>cALwtraAl+rararu:uo� ^_�? ] t6n 2 11.4393134 tiH#:N1, T 5(41 bN3 F75.G i f 11 a82' FTBn-VWL i4i L0(:49O42 PP4GEn NCAAYii_._. =_.. , --� BL@�4'A47H4T rlV JCSS ftAVFH15T4?Rt PF _I C0A114G 0L51 VWH KOAW,EC OR 15ANWGEOPf$ r�D 7VD I CSVTVPE 4LV FLAT& €[Nil" O4TE 5 3165 13163 9 07151 CMM W 0 ,89=15 4 .5919 152$5 48 O1N'l OABI RAA r 0 09/30/15 3 8397' 6995 44 OT13 CMY FN 0 09130715 2 10403! 6:965 46 0715 WSL MA - 0V.W5 1 10589184% 46 0718 DMY 1`,A 0 14122,114 I UAKETI MC AN" OR C -� 3A96� io&W i #g-t;,A•; a1,r Bwx :7<Tt, ID ='59F 76738' ._31--C1.M6 TT L00Oi561N5�9L7 19108' 7'Ab1F3187 JO14T r ?? ii FiSFi POS OOVtAsPRT�K'CBYTRALQSt L J� AFAd {015031145 I �� !.-?Lbn rx>cALwtraAl+rararu:uo� ^_�? ] t6n 2 11.4393134 tiH#:N1, T 5(41 bN3 F75.G i f 11 a82' FTBn-VWL i4i L0(:49O42 PP4GEn NCAAYii_._. =_.. , --� BL@�4'A47H4T rlV JCSS ftAVFH15T4?Rt PF _I C0A114G 0L51 VWH KOAW,EC OR 15ANWGEOPf$ OF Tye • • h*.P\\ //7 tv THE STATE Alaska Oil and Gas 01, til,. A of T e 1 Conservation Commission 333 West Seventh Avenue "74-7414•1. GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Oliver Sternick Well Integrity Engineer 5CAIIEa MAS?• p BP Exploration (Alaska), Inc. 4 2016 P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU S-23 Permit to Drill Number: 190-127 Sundry Number: 316-128 Dear Mr. Sternick: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, f-2:Le,7-7r,t./ Cathy . Foerster �� Chair DATED this!-'� day of February, 2016. RBDMS ti v FEB 2 6 2016 STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMI APPLICATION FOR SUNDRY APPROVA S 20 MC 25.280 1. Type of Request: Abandon 0 Plug Perforations 0 • Fracture Stimulate 0 Repair Well ❑ Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Pull Tabing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool ❑ Re-enter Susp Well 0 Alter Casing 0 Other New Tech-BiSN Plug 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number 190-127 - Exploratory 0 Development 0 3. Address: P.O.Box 196612 Anchorage,AK 6. API Number: 50-029-22088-00-00 • 99519-6612 Stratigraphic 0 Service 0 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No 0 PBU S-23 RECEIVED 9. Property Designation(Lease Number): 10. Field/Pools: FEB 1 7 2016 ADL 0028258 ' PRUDHOE BAY,PRUDHOE OIL ' D-7# Z�2¢l4 11. PRESENT WELL CONDITION SUMMARY ®® �/'��/ lac A®�.IAe"w,. Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 11634 • 9224 . 10681 8560 10681 See Attachment Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"Conductor 33-113 33-113 0 0 Surface 2669 13-3/8"68#L-80 33-2702 33-2702 5020 2260 Intermediate 10899 9-5/8"47#L-80 29-10928 29-8732 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment See Attachment 4-1/2"12.6#L-80 L-80 27-10741 Packers and SSSV Type: 4-1/2"Baker F-1 Packer Packers and SSSV MD(ft)and TVD(ft): 10652, 8539.56 No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary 0 Wellbore Schematic 0 13.Well Class after proposed work: - Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development 0 Service 0 14.Estimated Date for Commencing Operations: 3/8/16 15. Well Status after proposed work: Oil 0 WINJ 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Sternicki,Oliver R be deviated from without prior written approval. Email Oliver.Sternicki@bp.com Printed Name Sternicki,Oliver R Title Well Integrity Engineer Signature --- -� Phone +1 907 564 4301 Date 2 /7 / COMMISSION USE ONLY ! Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 3\ R - X21( Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0 Other: / Post Initial Injection MIT Req'd? Yes 0 No 'J Spacing Exception Required? Yes 0 No g Subsequent Form Required: `G 4 c4, APPROVED BYTHE Approved by: "1 COMMISSIONER COMMISSION Date: Z—Z�/� it L /7 //1.• ORIGINAL RBDMS FEB L 6 2016 ,e2-4o Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • • Junk Attachment PBU S-23 SW Name MD Date Comments S-23 11299 07/03/2014 Piece of WRP Rubber Element S-23 11345 07/03/2014 PDS Bowstring Centralizer Arm S-23 11390 06/02/2008 PDS Caliper Arms S-23 11400 01/26/2007 2 Rubber Elements, 1 Stiffing Ring S-23 11582 01/26/2007 W/L Tel Locator Finger In GLM#1 • a o 0 0 0 0 R O O r N O C N O ti N- C) o 0 0 0 0 L N N' CC) CO 7 O CO N r t7 m O CO N- CO 00 co N N c- 0 Cr) CO O f� N- N CO N CO O) 6) CO I I I I I I H 10 U) M M O C) M N- M M N O r N O O Asa N CO Nt M O N O N d' r O CO CO N. r N O r r 0 r r r '- C.) EIIIIII M LOQ N MM CD N. M co N N /^= r c- a.o- Loo 2 1 C?c OaO C) UJJaooJ _C CD -3 *k J J 4:k C N U a`O N N 0 oM11n � F� � = C) OO co O Jcao0 (000N- rN-N O 0 r W � Q c0H 0 U wW O O � W Q. c Z ZCW W W CD ODF- ZZD U fn Z J • . 0 0 0 CO O) r C) N r tp CO "7' Cfl N M r M Cr O N O▪ C) O N C") CO N LC) CO p 1- O) C) C) CA O O O a a0 CO CO CO CSO CA C) O) > 0. 0 - 00 1- CO O N (n CO CD t N N N Co r M Tt C70 fl- O CO mi N tf) 4 CO o0 ❑ d � CS) O N M CA (,) t() W p N- oO CA CA CS) CA O O > p 00 CO OD Cb 00 00 CA CA 0 w ❑• ❑ w z w p W ❑ N Y J o U 0 m O O Cr) W Y Cn N N O d d O (70 J U U W W _ f- O N CA to C70 O J J J d d fn Z O r N N N C�) M ,T ¢ ¢ ¢ w (9 - � U A U J W U U W W • r r r . . . . . Z Z Z OJ J J D J Ca ¢ ¢ ¢ 2 ❑ ❑ 0_ W 4_ O O O w d c Z o z W w W 0_ I— I— ¢ J ¢ V M 2 2 2 O co U) Co to cn }ACV < CO a 0 • r CA LO N N O V CO M Q CO 00 O N O CO CA O LLI a) O `- N N M M M +� li 0• r r r r r r r r L d O 2 = 0) = 10 O a J a I-2 2 O to cn cn up cn 0) a 0 U C• C/) C/) C/) Cn C/) C/) U) C/) ;, mmmmmmmm a 0 0 m 0 0 a tnUOUntnUDUlU, UD ❑ 0 0 0 0 0 0 0 0 0 w O N N N N N N N N Z ¢ W Ow N W N N N N N N N N Z w W U W W W W 00.0 M C) C) M M M MCA W J J J ❑ 0 ¢ ¢ 0_ 0) U UL U W d w a) E m z m M M M C') m m M C0 °4N N N N N N N tl 0 C/) O w N tL Ch (A C/) C/) U) Ci) Ch (/) ¢ ¢ m m ti � W a c • ALASKA WELL ACT).STATEMENT OF REQUIREMENTS (V2.0,DBID,EAZ,BPG 10/12/15) General Information Well Name: S-23 Well Type: Gas Lift Producer API Number: 50-029-22088-00 Well Activity Conventional 4 Classification: Activity Description: Set BiSN Plug Cost Code/AFE: APBOTMMA Field/Reservoir: PRUDHOE IVISHAK 12 Month Avg IOR, bopd: Job Type: Profile Modification Estimated Cost, $K: AWGRS Job Scope: NEW TECHNOLOGY PROJECT Other regulatory requirements? Sundry Form 10-403 Required? Yes Sundry Form 10-404 Required? Yes Primary Secondary Engineer: Matt Bergene Contact numbers: (907) 564-4849 (307)630-9653 Well Intervention Engineer: Oliver Sternicki Contact numbers: (907) 564-4301 (907)350-075 Lead Engineer: Brian Glasheen Contact numbers: (907) 564-5905 (907) 545-1144 Date Created: February 12, 2016 Revisions(date,who,what changed): Current Well Status Information Water Rate or Gas Rate or FTP or Injectior Date Oil Rate In) Rate Gas Injection GOR Choke Setting Gas Lift Rate Pressure (bopd) (bwpd)Water Rate (scf/stbo) (Mscf/Day) Cut(%) (Mscf/Day) (psi) 11/26/2014 121 2524 bwpd, 1,220 10,099 95 3,000 218 WC 95.43% Current Status: Not Operable Shut In Inclination>70°at Depth(ft) Recent H2S (date, Maximum Deviation (Angle and 51° 5,301' MD ppm) 11/16/2014 *ppm Depth) — Datum depth,ft TVDss 8800' TVDss Dogleg Severity(Angle and Depth) 3° 5,512' MD Reservoir pressure(date, 4/19/2005 3,426psi Minimum ID and Depth psig) P 3.725" 10,702' MD Reservoir Temp,F 224° F Shut-in Wellhead Pressure Known mech. integrity problems(specifics) 07/04/14: Caliper 4.5"0-64% penetration. IA x OA comm unmanageable by bleeds Last downhole operation (date, 10/5/2015 Set TTP @ 10681' MD, set DGLV in sta#2, operation) Most recent TD tag(date,depth, 7/3/2014 11,162' MD 4 1/2" BRUSH, 3.68"CENT, 2' x 1 7/8"WB, 3.70"CENT& toolstring OD) 3.50" MAGNET Surface Kit Fit-for-Service? If No,Why? If well has been shut in for> 1 year or job cost>$500M, fill out Non Rig Surface Equipment Checklist. Comments,well history, SH leak confirmed-04/11/14 background information, IA x OA comm unmanageable by bleeds etc: OA Downsqueezed-4/13/03 > 04/17/14: MIT-IA Passed to 2500 psi >07/04/14: Set LGLVs, Caliper 4.5"0-64% pen; 7"281 jts 0-29% pen, 3 its 70-93% pen, Possible hole 11,081'MD, ovality > 09/29/15: Set TTP @ 10681' MD, set DGLV in sta#2, CMIT-TxIA Passed to 2000 psi • • Well Intervention Details • Suspected Well Problem: SH Leak Specific Intervention or Well Objectives: 1 Set 3.5" OD BiSN plug in 4.5"tubing tail and pressure test plug to validate setting. 2 3 Key risks,critical issues: Mitigation plan: 1 New technology L2RA for BiSN plug 2 Setting off BiSN plug at surface. BiSN specific procedure to be followed 3 Bursting corroded 4.5"tubing Hold 1000 psi back pressure on the IA While conducting MIT-T. Summary Service Line Activity Step# 1 FB CMIT-TxIA to 3000 psi 2 SL Pull PXN plug 3 EL Set bottom of BiSN plug @10709' 3 FB CMIT-TxIA to 500 psi, 1000 psi, 1500 psi, 2000 psi, 2500 psi, 3000 psi. LLR if fails Detailed work scope(If no RP/SOP exists for the intervention type,a well-specific procedure is required in addition to the SOR): 1 FB CMIT-TxIA to 3000 psi 2 SL Pull PXN plug Set bottom of BiSN plug @10709'. Though not an explosives operation follow grounding and isolation 3 EL procedures set forth in GWO Alaska Region Recommended Practice: E-Line Set Packers,Retainers, and Bridge Plugs. Tie into the attached tubing tally dated 10/15/1990 3 FB CMIT-TxIA to 500 psi, 1000 psi, 1500 psi, 2000 psi, 2500 psi, 3000 psi. LLR if fails Performance Expectations(may be NA if no change anticipated due to the intervention) BOPD: MMSCFD: BWPD: Expected Production Rates: — FTP(psi): Choke setting: PI(bfpd/psi dp) Post job POP instructions: Leave SI Attachments-include in separate excel worksheets Required attachments: Current wellbore schematic As needed: Perf form,logging form,well test chart,annotated mini log,annotated log section,tubing/casing tallies,Wellhead info,etc Approvals Management Approval: Date: Wells Approval: Date: TREE= 4-1/16"aw SAFETY NOTES: NOTIFY GC OF ANY W8.1 OPERATION S ACTUATOD2=__._____ • -2 3 TO 3 FLOWLINHIDULD NEE(POTENTIALSE FLOW ON RATES Dl E OTIS ODS.ELEV= 64.56' BE ESV= 35.73' KOP= 3165 Max Angfe= 51"@ 5301' .__-__..------_. --- 2109' —14-1/2"011S SSSV NP,D=3.813" Datum MO= 11120' Datum IVO= 8800'SS GAS LFT MANDRELS 13-3/8"CSG,68#,NT-80,D=12.415" --I 2702' ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3165 3163 9 OTIS DMI' RM r 0 09/30/15 4 5919 5265 48 OTIS OMD' RMt ' 0 09/30/15 Minimum ID = 3.725" 10702' L 3 8397 6985 44 OTIS OMy' RM r 0 09/30/15 2 10403 8366 46 OTIS FLWSLV RM — 09/30/15 4-1/2" OTIS XN NIPPLE 1 10589 8496 46 OTIS OMY RA ' 0 11/22/94 I I 10618' —14-1/2"PKR SWS NP,ID=3.813" 10624' BAKER TBG ANCHOR,D=3.958 10625' —9-5/8"x 4-1/2"BKR PKR,D=3.99" '® 10681' 4-1/2"FKR SWS NP,ID=3.813" TOP OF 7"LNR -H 10692' 10681' --14-1/2"PX PLUG(09/29/15) 10702' H4-112"OTIS XN NP,D=3.725" to Tog k gr5A''pl-y 4-1/2"TBG,12.6#,L-80 TDS, —{ 10714' 10714' H4-1/2"WLEG,D=3.958" .0152 bpf,E)=3.958" 10738' —{ELMD TT LOGGED 01/05/90 9-5/8"CSG,47#,NT-80S,ID=8.681" H 10928' 1 FEFFORATlON SLM,4ARY RE=LOG:MWD RESITN ON 10/10/90 ANGLE AT TOP FERF:46"@ 10949' Note:Refer to Production D8 for historical pert data 11108' —17"MARKER JOINT SEE SPF INTERVAL Opn/Sgz SHOT SQZ 3-3/8" 4 10949-11019 0 07/09/93 3-3/8" 10 11165-11172 0 11/20/91 3-3/8" 6 11182-11220 0 11/01/91 3-3/8" 4 11182-11294 0 11/03/90ilk ?? —I FISH-PECE OF INRP RUBBER H.EN(07/03/14) 3318" 4 11304-11354 0 11/03/90 ' ?? —ASH-FDS BOWSPRNG CHYTRALIZD32 3-3/8" 4 11364-11386 0 11/03/90Ilk 3-3/8" 4 11396-11408 0 11/03/90 p ?? —{FISH-PDS CA LEER ARMS(06/02/08) 7"LNR,26#,L-80 TC4S,.0383 bpf,D=6.276" -H 11505' 'I ' ?? FISH: 2 RLEBB213i3VID JT,1 STFFNG PNG 11582' —ASH-W/L TEL LOCATOR FINGER N GLM#1 PBTD —I 11582' ........4 1111111 SUBSEQUENT CTU JOBS HAVE HISTORYOF 111111111/1111, 1 O MP G CXJT WITH MARKED OR DAMAGBD PIPE 7'LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" —{ 11624' 1 1.1•� 1 DATE REV BY COMutBVTS DATE REV BY COMMENTS NITS FRUDHOE BAY UNIT 11/06!90 N-18E ORIGINAL COMPLETION 10/02/15 TBDJMtD GLV C7O(09/30/15) WELL: S-23 07/07/14 PJC API NUMBER CORRECTION FORINT No: '1901270 07/08/14 WECIJP4)GLV C7O(07/04/14) AR No: 50-029-22088-00 07/08/14 JMD LEGENI]'OKB CORRECTIONS Sec.35,T12N,T12E,1631'FN &944'FWL 07/08/14 JAMJMD PULL WRPfFISH(07/02-03!14) 10/02115 TBLYJMD SET PX PLUG(09/29/15) BP Exploration(Alaska) ' �M WeICII0k ' , 1 "'.�,t.�• ,. 4 ,.. '" a =�,c' • d 4.w +,. ,A , ,,„,,... ... . i it/,,,,/ A , h k } y jr`F: Metal to Metal Gas Tight Seal 0 No mechanical parts Effective even in Corroded and Damaged Casing ® Larger Drift than Traditiona o 0 . fJ Bridge Plugs - by 'asses restrictions 0 ® ,f `® 4®° 0 0 /® ® Soo Reduced Rig Time - Ready for �! X 4° 4 )0 a 11 ®;)991 t 3 4 ®V D Testing in 1 /2 hour ,d' ' J,;> ® ® ® ®® ®/ 0 i . . igh Holding Pressure, .. j. • ®,, I • 4 High Working Temperature up to 600 °C f` )a♦♦$ If •I•$I 9 0.1160 :: ®111100,1 4 ISO 14310 -VO Rated - Gas Tig tf 749s®0 y q 1 � s m (: ` ' For further information call us on; 832-919-7500 BlSN _ email: info@bisnoiltools.com 1 www.bisnoiltools.com OIL TOOLS • • ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 June 25, 2009 R ~ Enclosed please find a spreadsheet with a list of wells from S-Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, ~~~'~~~r " ~-. {,. ~~,-; ~ i~~.. ~ v ~G~,:a Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) S-pad ~ ~..+~ []p}p 6/25/2009 Well Name PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor C.OffOSlOfI inhibitod sealant date ft bbls f[ na al 5-078 1952020 025 NA 025 NA 2.6 5/30/2009 S-02A 1941090 025 NA 025 NA 1.7 5/25/2009 S-03 /811900 1325 NA 7325 NA 92.65 5/20/2009 5-04 1830790 0 NA 0 NA 0.9 5/25/2009 S-OSA 1951890 0 NA 0 NA 0.9 5/26/2009 5-06 1821650 0 NA 0 NA 0.9 5/26/2009 S-07A 1920980 0 NA 0 NA 0.9 5/26/2009 S-088 2010520 0 NA 0 NA 0.85 5/27/2009 5-09 1821040 1.5 NA 1.5 NA 9.4 5/37/2009 S-10A 1911230 0.5 NA 0.5 NA 3.4 5l31/2009 S-11B 1990530 025 NA 025 NA 1.7 5/27/2009 S-12A /851930 0.25 NA 0.25 NA 1.7 6/1/2009 S-13 7827350 8 NA 8 NA 55.3 6/1/2009 5-15 1840170 025 NA 025 NA 3 6/212009 S-17C 2020070 025 NA 025 NA 2.6 6/i/2009 S-18A 2021630 0.5 NA 0.5 NA 3 6/2/2009 S-19 1861160 0.75 NA 0.75 NA 22 5/19/2009 S-20A 2010450 025 NA 0.25 NA 7.3 5/19/2009 5-21 1900470 0.5 NA 0.5 NA 3.4 5l25/2009 S-22B 1970570 0.75 NA 0.75 NA 3 5/19/2009 5-23 ~ 1901270 025 NA 025 NA 1] 5/25/2009 5-248 2031630 0.5 NA 0.5 NA 2.6 5/25/2009 S-25A 1982140 0.5 NA 0.5 NA 2.6 5/25I2009 5-26 1900580 0.75 NA 0.75 NA . 3.4 5/26/2009 5-278 2031680 0.5 NA 0.5 NA 2.6 5/31/2009 S-288 2030020 0.5 NA 0.5 NA 2.6 5/31/2009 S-2sA~1 7960120 0 NA 0 NA 0.85 5/27/2009 S30 7900660 0.5 NA 0.5 NA 5.1 5/31/2009 S31A 1982200 0.5 NA 0.5 NA 3.4 5/26/2009 S-32 1901490 0.5 NA 0.5 NA 3.4 5/31/2009 5-33 1921020 0.5 NA 0.5 NA 4.3 5/26/2009 S-3a 7921360 0.5 NA 0.5 NA 3.4 5/31l2009 S35 1921480 0 NA 0 NA .BSin 5/31/2009 S38 1921160 0.75 NA 0.75 NA 425 5/27/2009 5-37 1920990 125 NA 125 NA 11.9 5/27/2009 S-38 1921270 025 NA 0.25 NA 102 5/27/2009 S-47 7960240 1.5 NA 1.5 NA 11.1 5/30/2009 5-42 1960540 0 NA 0 NA 0.9 SI30/2009 S-43 1970530 0.5 NA 0.5 NA 7.7 5/28/2009 S-44 1970070 025 NA 025 NA 1.7 5/28/2009 5-700 2000760 2 NA 2 NA 21.3 5/29/2009 5-101 2001150 125 NA 125 NA 11.9 5/29/2009 S-t02L1 2031560 1.25 NA 125 NA 11.7 5/31/2009 S-103 2001680 1.5 NA 1.5 NA t1.9 5/18l2009 S-104 2001960 1.75 NA 1.75 NA 15.3 5/20/2009 S-to5 2001520 4 NA 4 NA 32.7 5/20/2009 5-106 2010720 1625 NA 1625 NA 774.3 6/2/2009 S-7o7 2017130 2.25 NA 225 NA 28.9 5/18/2009 S-toe 2011000 3.5 NA 3.5 NA 40 5/30/2009 S-10s 2022450 2 NA 2 NA 21.3 5/30/2009 S-110 2011290 1775 NA 17J5 NA 98.6 5/30/2009 S-111 2050510 2 NA 2 NA 19.6 5/30/2009 S-112 2021350 0 NA 0 NA 0.5 5/30l2009 5-113 2021430 1.75 NA 1.75 NA 22.1 5/18/2009 5-114A 2021980 1.25 NA 125 NA 10.2 5/30/2009 5-115 2022300 2.5 NA 2.5 NA 272 5/29/2009 5-116 2031810 1.5 NA 1.5 NA 13.6 5/28/2009 5-117 2030120 1.5 NA 1.5 NA 15.3 5/29/2009 S-118 2032000 5 NA 5 NA 76.5 5/28/2009 5-1~9 2041620 1 NA 1 NA 52 5/30/2009 S-120 2031980 5.5 NA 5.5 NA 672 5/29/2009 5-121 2060410 4.5 NA 4.5 NA 53.6 5/28/2009 5-~22 2050810 3 NA 3 NA 21.3 5/29/2009 S-i23 2041370 1.5 NA 1.5 NA 20.a 5/26/2009 5-124 2061360 175 NA 1 J5 NA 11.9 5/26f2009 S-125 2070830 225 NA 225 NA 20.4 5/28/2009 5-126 20710970 125 NA 125 NA 15.3 6/7/2009 5-200 1972390 1.25 NA 125 NA 14.5 5/28l2009 S-201 2001840 0 NA 0 NA 0.85 &79/2009 S413A 2042130 2 NA 2 NA 13.6 5/29/2009 5-215 2021540 2 NA 2 NA 7E.7 &1/2~9 S-2t6 2007970 4.75 NA 4.75 NA 57 5/29/2009 5-277 2070950 0.25 NA 025 A 1.7 6/1/2009 5-400 2070740 2 NA 2 NA 9.4 5/28/2009 S-401 2060780 16 NA 16 NA 99.5 6/2/2009 5-504 0 NA 0 NA O.ES 5/28/2009 C~ ~ - -~.~ HAS BEEN O1',1 OR BEFO STATE OF ALASKA ALASKA'OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [~Abandon [] Suspend [] Plugging []Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1631' SNL, 4336' WEL, SEC. 35, T12N, R12E, UM At top of productive interval 1848' SNL, 1110' WEL, SEC. 27, T12N, R12E, UM At effective depth 1552' SNL, 1151' WEL, SEC. 27, T12N, R12E, UM At total depth 1516' SNL, 1156' WEL, SEC. 27, T12N, R12E, UM t5. Type of well: [] Development [] Exploratory [~ Stratigraphic [-1 Service 6. Datum Elevation (DF or KB) KBE = 64.56' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number S-23 9. Permit Number 90-127 10. APl Number 50-029-22088 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 11634 feet 9224 feet 11583 feet 9189 feet Length Size Structural Conductor 110' 20" Surface 2673' 13-3/8" Intermediate 10899' 9-5/8" Production Liner 942' 7" Plugs (measured) Junk (measured) Cemented 2255 cu ft Arcticset III & II 1515 cu ft Class 'G' 266 cuft Class 'G' 139' 139' 2702' 2667' 10928' 8697' 10692'-11624' 8526'-9183' Perforation depth: measured 11165'-11408'¢iveintervals) true vertical subsea 8832'-9003' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 10714' ORIGINAL Packers and SSSV (type and measured depth) 9-5/8" Baker Packer at 10625'; SSSV Nipple at 2109' 13. Attachments [~ Description summary of proposal ~] Detailed operations program [] BOP sketch 14. Estimated date for commencing operation December 24, 1998 16. If proposal was verbally approved Name of-approver .Da. te approved Contact Engineer Name/Number: C. Michael Jackson, 564-5480 15. Status of well classifications as: [~ Oil E~ Gas [~ Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Dan Stone Title Engineering Supervisor Commission Use Only Date Conditions of Approval: Notify Commission so representative ma~witness Plug integrity / BOP Test / Location clearance Mechanical Integrity Test ~ ,,,',riginal Sign~0 u~ Approved by order of the Co~rr~~' Johnston Form 10-403 Rev. 06/~15/88 I Approval No.~-, _~¢~ Subse~se.~t form required 10- ~ o ~ ." ~e~%' ~!~V Commissioner Submit In Triplicate ka are. d rv ces rilling BP Exploration / ARCO Alaska Inc. To: Blair Wondzell - AOGCC Date: December 16, 1998 From: C. Michael Jackson Subject: S-23A Application for Sundry Permit The S-23A sidetrack is currently scheduled for Nabors 7ES following the completion of E-04A. * Notify the field AOGCC representative with intent to plug and abandon * Pre-Riq Work: . Perform a cement P&A of 15.8 ppg class 'G' cement with adequate cement volume to cover the 7" liner from PBTD at 11,582' to a minimum of 100' above the top perforation at 11,165' plus squeeze 5 bbls to the perforations. Estimated cement volume needed is 25 barrels. A full bore P&A is recommended but is at the discretion of the Wells Group. There are no GLM's in the completion string. Note: Top of cement must be at a minimum of 11,065' for AOGCC compliance. Top of cement may extend into the tubing as long as it does not interfere with the tubing cutting operations. 2. Rig up slickline, tag and document top of cement. 3. Cut the 4 1/2" L-80 tubing in the middle of a full joint of tubing at 4600'. This cut will not be fished and is at the discretion of the Wells Group as to chemical or jet cut. 4. Test the FMC 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes. 5. Test the casing against the cement plug to 3000 psi for 30 minutes. Freeze protect top 2200' MD with diesel. Ensure the cut is successful and communication exists between casinq/tubin.q to avoid tubing collapse. 6. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000 psi. Secure well. 7. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Rig Operations: 10. 11. 12. 1. MIRU Nabors 7ES 2. Circulate out freeze protection. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. 4. Pull 4-1/2" tubing. 5. Make up an 8.5" bridge plug on drill pipe and set at 4200'. 6. Weight test the bridge plug and pressure test the casing to 3000 psi for 30 minutes. 7. Displace the well to milling fluid and spot a 18 ppg pill from the bridge plug to the milled section. 8. RIH with 9-5/8" Baker section mill assembly and mill a 50' window from 3900' to 3950'. 9. RIH with a mule shoe to 100' below the base of the section and spot a 17 ppg balanced cement plug from 100' below the section to 200' above the section. Kick-off drilling the 8-1/2" intermediate section to TSag @ +9687' md(8744' TVD). Run and cement a 7", 26# intermediate liner with a minimum of 150' liner lap in the 9-5/8". Test the 7" and the 9-5/8" casing from the 7" landing collar to surface to 3000 psi for 30 minutes. 13. Drill the 6" production section building 34°/100' to horizontal targeting the Sag River sands(8744' TVD) to an estimated depth of 12,403' md(8823' TVD). 14. Run a 4-1/2", 12.6# slotted production liner throughout the 6" wellbore. A Bonzai(solid/cemented and slotted) liner will be a contingency dependent on the amount of drilled 15. Run a USIT / CBT on e-line as deep as possible logging the 4.5" and 7" cement bond for 1000' above the top of the 4.5" liner. ;1 6. Test the 4-1/2", 7" and 9-5/8" casing from the 4-1/2" landing collar to surface to 4000 psi for 30 minutes. 17. 18. 19. 20. 21. 22. The 4-1/2" production liner will be perforated with DPC 2.75" guns on a 400 psi under balance. Perforating intervals to be determined after reviewing logs. Run 4-1/2" NSCT L-80 completion tying into the 4-1/2" liner. Test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes with 2000 psi on the tubing. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Freeze protect the well to -2200' and secure the well. Rig down and move off. Estimated Pre-rig Start Date: 12/24/98 Estimated Spud Date: 01/07/98 C. n 564-5486 ;12/;16/98 NELLHEAD: 13-5/8" - 5M FMC ACTUATOR: OTIS NT-8OCYHE, BTRS CMT'd- KOP: 2800 MAX ANGLE: 52 ° TDS TNON~IPC TUBING CAPACITY: 0.0152 BBL/FT TopofTIW [ 10692 ] Liner Hanger 9'5/8"'47#~' [ 10928] NT-80S, NSCC REF: LOG: MWD ESITIV.IO/10~30 3-3/8 6 11182-11220 OPEN / 11-91 3-3/8 4 11182-11294 OPEN 3-3/8 4 11304-11354 OPEN 11396-11408 O PEN BF. ELEV = 35.73 SSSV LANDING NIPPLE 2100 -- (Otis)(3.813" ID) GAS LIFT MANDRELS 5 3165 3100 4 5919 5200 3 8397 6892 2 10403 8302 I 10589 8432 "SWS" NIPPLE [ 10618 (PARKER) (3.813" ID) BAKER TUBING I 10624 ANCHOR 9 -5/~" PACKER I (Baker) (3.99" ~D) 10625 4-1~2", 12.6 #~1, L-80 TAILPIPE 4-1/~" *'SWS" NIPPLE [ (PARKER) (3.813" ID) 10681 4-1/2" "XN" NIPPLE [ (OTIS) (3.725" ID) 10702 4-1/2" WLEG (ELMD) [ 10713 10738 -- MARKER JOINT I 11113 -- ~ Minimum Top of Cemer~ NOTE: 3#ELOWLINE IN SKID PORTIONS OF THIS WELL'S ELOWLINE ARE 3" AND SUBJECT TO EROSION. THE GC SHOULD BE NOTIFIED OF ANY WELL OPERATION WHICH COULD iNCREASE FLOW OR EROSION RATES. PBTD 111302 7", 26 #/ft, L-80, BTRS I 11634 DATE 10-16-90 REV, BY DFF COMMENTS iNITIAL OMPLETION 11 -O5-90 RAB iNITIAL PERFORATIONS 11/29/90 CMM ADDED TBG TAILELMD RQM ~EC 3s: T12N: RG12E BP EXPLORATION 11/19/91 ADDED FRAC PERES I AlaSka hared ervlces rilling WELL NAME S-23 DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT D Permit Documentation Prepared: ODE: Date: [-~ Permit Application Reviewed: SDE/ES: Date: D Permit Application Submitted: TA: Date: SUNDRY NOTICE D Sundry Documentation Prepared: ODE: Date: D Sundry Application Reviewed: SDE/ES: Date: D Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW PRE-RIG WORK Reason for Sundry (Check all that aDDIy) Pre-Rig Memo Reviewed: SDE/ES: ~-----~---~,~'. ~ Pre-Rig Memo Sent to Slope: ODE: Date: ,d,~,,]q~ Date: Pre-Rig Sundry Documentation Prepared: ODE: ~' ."~,.t .D.~X q,.....__~ Date:~ Pre-Ri} Sundry A~plication Reviewed: SDE/ES: ~-----"~----,~.~~:~ Date:~/(~,)q% Pre-Rig~,Sundry Submitted: TA: '~h0~~ ~lC~ Date:l~ Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Other(Explain): Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimulate I APPROVAL TO PROCEED Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 17 November 1994 Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION ' 1 PLS FINAL BL 1 PLS FINAL RF 1 PLS FINAL BL 1 PLS FINAL RF 1 PLS FINAL BL 1 PLs FINAL RF 1 PLS/STP FINAL BL 1 PLS/STP FINAL RF Run # 1 Run # 1 Run # 1 Run ~ 1 Run # 1 Run # 1 Run # 1 Run # 1 1 PLS FINAL BL Run # 1 1 PLS FINAL RF Run # 1 1 PLS FINAL BL 1 PLS FINAL RF Run # 1 Run # 1 1 PLS FINAL BL Run # 1 1 PLS FINAL RF Run # 1 ECC No. 2012.03 4123.04 4440.03 4887.06 4892.02 5613.02 5865.02 Received by: / 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson STATE OF ALASKA ALA,~'~' OIL AND GAS CONSERVATION COMMISSI¢ REPORT (JI= SUNDRY WELL OPEI-IATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well Perforate X Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1631 'SNL, 4336 WEL, SEC. 35, T12N, R 12E At top of productive interval 1848'SNL, 11 IO'WEL, SEC.27, T12N, R 12E At effective depth 1552'SNL, 1151 'WEL, SEC. 27, T12N, R 12E At total depth 1516'SNL, 1156 WEL, SEC.27, T12N, R12E 5. Type of Well: Development X Explorato~ Stratigraphic Service 6. Datum elevation (DF or KB) KBE=64.56 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-23(42-27-12-12) 9. Permit number/approval number 90-127 / 10. APl number 50- 029-22088 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length -- 11634' feet 9224' feet Plugs (measured) 11583' feet Junk (measured) 9189' feet Size Cemented Measured depth 139 2702 10928 110' 20" 2673' '3 3/8" 2255 cuft Arcticset Ill&Il 10899' 9 5/8" 1515 cu ft Class G measured .. 942' 7" 266 cu ft C/ass G 10682-11624 11165'-11172', 11182'-11294', 11304'-11354', 11364'-11386' true vertical subsea8832'-8837',8844'-8923',8930'-8965',8972'-8987' True vertical depth BKB 139 2667 8697 8526-9183 Tubing (size, grade, and measured depth) 4-1/2"12.6# L-80 @ 10714' Packers and SSSV (type and measured depth) Packer set @ 10625' and SSSV @2109' RECEIVED 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure d iJ i'"i 2,'5 ...':,.!:'_-.'-;i:a. 0::i & C, as 0ohs. 6orr~rnission Anchorase 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure ,~-? 1990 5403 2025 1796 1660 /~ 1070 1692 1384 Tubing Pressure 291 259 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby c~rti~ that the foregping is true and correct to the best of my knowledge. Si~ned ~-/~v~,~ (i) ~-~ (~_~,.~ Title Senior TechnicalAssistant/ Form 10-404 Rev 06/15/88 ~/~ Date SUBMIT IN DL,4'PLI(~ATE WELL S-23(42-27-12-12) ADDPERF 07~8~3 The following additional interval were perforated using 3 3/8" guns, 4 SPF, random orientation and 120° phasing. 10949' - 11019' MD SAG PERFS fjh 6/20/94 RECEIVED d t..! I ~ (' ~:i ':' ..-. x~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 07/13/93 T# 84761 BPX/PBU CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-40 SBL S-23 ~ ~'\~/ PERF X-13A ~5 SBL X-13A %%' PERF 07/09/93 #1 07/07/93 #1 07/09/93 #1 07/06/93 #1 07/07/93 #1 Z-06~,~~ PRODUCTION LOG 06/07/93 #1 Information Control Well Records 8900.00- 9496.00 ATLAS 5 " 9720.00-10189.00 ATLAS 5 " 10850.00-11130.00 ATLAS 5 " 10220.00-10716.00 ATLAS 5 " 7800.00-10650.00 ATLAS 5 " 9850.00-10350.00 ATLAS 5 " FI E P ORT nF'SUNDRYWEL LOPEFIATI O N S 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull tubing ~ Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1631 'SNL, 4336 WEL, SEC. 35, T12N, R 12E At top of productive interval 1848'SNL, 1110'WEL, SEC.27, T12N, R12E At effective depth 1552'SNL, 1151 'WEL, SEC.27, T12N, R12E At total depth 1516'SNL, 1156 WEL, SEC.27, T12N, R12E 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE=64.56 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-23(42-27-12-12) 9. Permit number/approval number 90-127/ 10. APl number 50- 029-22088 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 11634'feet Plugs (measured) 9224*[eet 115831eet Junk (measured) 9189'~eet Casing Length Structural -- Conductor 110' Surface 2673' Intermediate 10899' Production -- Liner 942' Perforation depth: measured Size Cemented Measured depth 20" 139 13 3/8" 2255 cu ft Arcticset IIl&fl 2702 9 5/8" 1515 cuft Class G 10928 7" 266 cu fi Class G 10682-11624 11165'-11172', 11182'-11294', 11304'-11354', 11364'-11386' True vertical depth BKB 139 2667 8697 8526-9183 true vertical subsea8832'-8837',8844'-8923',8930'-8965',8972'-8987' Tubing (size, grade, and measured depth) 4-1/2"12.6tt L-80 @10714' Packers and SSSV (type and measured depth) Packer set @lO625' and SSSV@2109' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure Alaska 0JJ & Gas CoBs. 6omm~ss\O~ Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 400 372 120 928 4110 /' 4031 650 1823 Tubing Pressure 25O 324 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations __ 16. Status of well classification as: Oil X Gas Suspended__ Service 17. I hereby ce~ify that the foreEm, ing to my r-- ¢ ~()/~ (i; i~tru~e and correct] thebestof knowledge. Signed~-._-~'~: ~.."i,¢'~-, ~-~ ,,,,~.~ /'~d-O~,-,~.~. Title Senior Technical Assistant, Form 10-40~ REV-06/15/88 Date /c.~/'// //¢,-.~ SUBMIT IN DUPLICATE WELL S-23(4.2-27-12-12) REPERF/FRAC The following interval was reperforated on 11/19/91 using 3 3/8 gun diameter with 6 shot density, random orientation and 60 phasing. 11165' - 11172' MD 11182' - 11202' MD 11202' - 11220' MD Performed hydraulic fracture on 12/01/91 pumped a total of i78,500# 16/20 carbolite pumped. 175,500# TO formation and 3,000# !eft in TBG/Liner. FLUIDS: 30 bbls 50# Gel Prepad to Establish Rate 4-i3 bbls 50# X-Link Gel Pad W/8% ESL 797 bbls 50# X-Link Gel 169 bbls 20# Gel Flush 120 bbls Diesel to PT lines and freeze protect 10/08/92 fjh RE6EIVED Alaska Oil & Gas Cons. Anchorage BP EXPLORATION BP Ex01oration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561.5111 DATE: 11/25/91 T# 83038 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. Information Control Well Records Adrian J. Martin CL 11/19/91 #1 11014.00-11320.00 ATLAS 5 " CARBON OXYGEN LOG 11/15/91 ~1 10800.00-11380.00 ATLAS BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO Date:l 0/18/90 CHEVRON T#:81602 EXXON MOBIL PHILLIPS ......... ~ TEXACO GEOSClENCE ARCHIVES BP OPEN HOLE FINAL Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. S-23 S-23 S-23 S-23 S-23 S-23 S-23 S-23 RWD DUAL PROP RGD 10/08/90 #11-12 0.0-11636 TELECO MENORY 1:600 MEASURED DEPTH RWD DUAL PROP RGD 10/08/90 #11-12 0.0-11 636 TELECO MENORY 1:240 TRUE VERTICAL DEPTH RWD DUAL PROP RGD 10/08/90 #11-12 0.0-11 636 TELECO MENORY 1:600 TRUE VERTICAL DEPTH RWD DUAL PROP RGD 10/08/90 #11-12 0.0-11 636 TELECO MENORY 1:240 MEASURED DEPTH RWD DUAL PROP RGD NPFD 10/08/90 #11-12 0.0-11 636 TELECO 2" MENORY 1:600 TRUE VERTICAL DEPTH RWD DUAL PROP RGD NPFD 10/08/90 #11-12 0.0-11 636 TELECO 5" MENORY 1:240 MEASURED DEPTH RWD DUAL PROP RGD NPFD 10/08/90 #11-12 0.0-11636 TELECO 2" MENORY 1:600 TRUE VERTICAL DEPTH RWD DUAL PROP RGD NPFD 10/08/90 #11-12 0.0-11636 TELECO 2" MENORY 1:240 TRUE VERTICAL DEPTH . . 1! *** G EOS/ARCO/EXXON/ARCHIVES ONLY. STATE ONLY: Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Date: Inforation Control Well Records LR 2-1 J..Dietz/S. McCurry Job#: Job#: ? , STATE OF ALASKA 0 t ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 90-127 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 s0- 029-22088 4. Location of well at surface 9. Unit or Lease Name At Top Producing Interval ~ 10. Well Number 1848'SNL, 1110' WEL, SEC. 27, T12N, R12E At Total Depth ~ ~.~ '~ ,! ! ~, ?",~_rl~_j Prudhoe Bay Field/Prudhoe Bay Pool 1516' SNL, 1156 WEL, SEC. 27, T12N, R12E 5~ Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Sedal No. 64.56' KBE I ADL 28258 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 9-23-90 10-10-90 11-06-90I N/A feet MSLI One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+'I'VD 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 11634'MD/9224'TVD 11583'MD/9189'TVD YES [] NO []I 2109 feet MD I 1900' 22. Type Electric or Other Logs Run CNL/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE w-r. PER FT. GRADE TOP BO'I-rOM I-K~E SIZE CEMENTING RECORD AMOUNT PULLED ., 20" Surface 110 13-3/8" 68# L-80 Surface 2702 16" 2255 cu ft Arcticset III & II 9-5/8" 47# NTSO-S Surface 10928' 12-1/4 1515 cufl Class G 7" 26# L-80 10682' 11624' 8-1/2 266 cu ft Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET IMDI PACKER SET (MD} Schlumberger 3-3/8" @ 4 spf 4-1/2" 12. 6 # 10 714' 10625' MD TVDSS L-80 11165'- 11172' 8832'-8837, 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11182'- 11294' 8844' - 8923' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11304'- 11354' 8930'-8965' 13-3/8"9-5/8" Freeze Protect with 144 bbls Diesel 11364' - 11386' 8972' - 8987' annulus 27. PRODUCTION TEST D'ate First Production IMethod of Operation (Flowing, gas lift, etc.) 12-4-90 I FIowin~7 Date of .Test Hours Tested PRODUCTION FOR DIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO ~ TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED..~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE i28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED FEB - 4 t991 Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. $0. GEC~Cx21C MARKERS -"~RMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 10949 8746 Schublik A 11017 8793 Zone 4 11165 8896 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge / Signed . Title rngirlcer Date. //----';¢~'-- INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday. September 24, 1990 - WELL: S-23 (42-27-12-12) AP! No. 5O-O29-22O88 Day: 2 Depth at 0600 Hrs. = 48 Hour Footage = 2,6O0 Ft. 2,600 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nab, ors Rig #18-E 125273 Current Operation' Drilling ,,Summary_ of Last 48 Hours: Accepted rig at 22:00 hrs on 9-22'90. Drilled the 16" hole to 2600'. Mud Tvoe Mud Weiaht Spud 9.4 #/gal Viscosity p V YP 105 Sec. 43 16 Fluid Loss Solids 12.0 cc 9% Temo oF Survey Deoth Anale Direction -- TVD N (+)/S (-) E(+)/W(-) Section Coordinate Coordinate Dog Leg o/100' Reviewed By: ,¢S RECEIVED FEB - 4 t99t Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday. September 25. 1990 - WELL: S-23 (42-27-12-12) APl No. 50-029-22088 Day' 3 Depth at 0600 Hrs. -- 24 Hour Footage = 21725 Ft. 12,5 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = .Nabor$ Rig #18-E 125273 Current Operation' POH Summary_ of Last 24 Hours' Drilled the 16" hole to 2725'. Ran 13-3/8" casing to 2125' but would not go. POH with casing and RIH to ream the hole to 17-1/2". Mud 'l'_v.oe Mud Weight Viscosity ? ¥ YP ~ Solids TemD Spud 9.3 #/gal 255 Sec. 43 61 12.0 cc 8% 56 °F Survey Depth Angle Direction TVD N (+)/S f-) E(+)/W(-) ...Dog Leg Section Coordinate Coordil3ate °/100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday. September 26. 1990 WELL: S-23 (42-27-12-12), APl No. ,,50-.029-22088 Day: 4_ Depth at 0600 Hrs. = 24 Hour Footage = 2,150 Ft. OFt. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #18-E 125273 Current Operation' POH Summary_ of Last 24 Hours: Reamed the hole with 17-1/2" hole opener (110'-2150'). POH Mud T_voe Mud Weight Viscosity Spud 9.11 fi/gal 210 Sec. PV yp Fluid Loss ~ TemD 34 62 12.0 cc 8% °F Survey D..EEtb Angle i.[~..¢..6.d.O~ TV.l:;) N (+)/S (-) E(+)/W(,) Dog Le.g Section Coordinate Coordinate °/100~ Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday. Seotember 27. 1990 WELL: $-23 (42-27-12-12~ AP! No. 50-029-22088 Day' 5 Depth at 0600 Hrs. = 24 Hour Footage = 2.735 Ft. 10 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Ria #18-E 125273 Current Operation' WOC Summary_ 0f Last 24 Hours: Reamed the 16" hole with 17-1/2" hole opener from 2150' to 2735'. casing. Ran and cemented 13-3/8" Mud Tvoe Mud Weiaht Viscosity Spud @.4 #/gal 185 Sec. Survey ~ Angle J~:.e.a~,JJ.Q~ TVD P ¥ YP .F~iLC[_J.Q~ Solids Temo 31 45 12.0 cc 8% °F N (+)/S (-) E(+)/W(-) Dog Leg Section Coordinate Coordinate °/100' Reviewed By: $$ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Friday. Seotember 28. 1990 WELL: $-23 (42-27-12-12) APl No. 5O-O29-22O88 Day: 6 Depth at 0600 Hrs. = 24 Hour Footage = 2.950 Ft. 215 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig #18-E 125273 Current Operation' Drilling Summary of Last 24 Hours: - Drilled cement inside the 13-3/8" casing. Drilled the 12-1/4" hole to 2950'. Mud T_vpe Mud Weight Low Solids 8.9 #/gal Viscosity P V YP 50 Sec. 10 27 Fluid Loss Solids Temo 15.0 cc 4% °F Survey Tvo N (+)/S (-) E(+)/W(-), Dog Leg Section Coordinate goordinate °/100' Reviewed By: $S BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, October !. 1990 WELL: S'23 (42-27-12-12). AP! No. 50-029-22088 Day: 9 Depth at 0600 Hrs. = 72 Hour Footage = 61515 Ft. 3.565 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #18-E 125273 Current Operation: Drilling Summary of Last 72 Hours: Drilled the 12-1/4" hole to 6515'. Mud Tvoe Low Solids Mud Weight 9.5 lC/gal Viscosity 36 Sec. p V. YP Fluid Loss Solids 6 7 8.0 cc 9% Temo oF Survey Deoth Anale -- 'l'VO N (+)/S (-) E(+)/W(-) Section Coordinate Coordinate DOg Leg °/100! Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: .PRUDHOE BAY UNIT As of 0600' Hrs. Tuesday, October 2. 1990 WELL: S-23 (42-27-12-12~ APl No. 50-029-22088 Day: 1,0 Depth at 0600 Hrs. = 24 Hour Footage = 7.630 Ft. 1,115 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #18-E 125273 Current Operation' POH Summary of Last 24. Hours' Drilled the 12-1/4" hole to 7630'. POH for bit change. Mud Tv0e Mud Weight Viscosity Low Solids 9.7 Cf/gal 39 Sec. PV .YP. Fluid Los~ ~ Temo 1 0 1 5 8.0 cc 1 1% °F Survey Depth ..Angle J;~[.E.e. flJ. Lg~ TVQ N (+)/S (-) E(+)/W(-), Dog Leg Sectign Coordinate Coordinate °/100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs...Wednesday. October 3. 1990 WELL: S-23 (42-27-12-12) AP! No. 50-029-22088 Day: !,1 Depth at 0600 Hrs. = 24 Hour Footage = 8,472 Ft. 8,42 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #18-E 125273 Current Operation: Drilling Summary of Last 24 Hours: Drilled the 12-1/4" hole to 8472'. Mud Type Low Solids Mud Weight 9.9 Cf/gal ,Viscosity 36 Sec. pv YP Fluid Loss Solids 8 5 11.0 cc 11% Temp 76 OF Survey Death Anale -- 'T'VD N (+)/$ (-) E(+)/W(-) Section Coordinate Coorclinate Dog Leg o/100' Reviewed By: ~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursda, y, OctOber 4, 1990 WELL: S-23 (42-27-12.12), APl No. 5O-O29-22O88 Day: 12 Depth at 0600 Hrs. = 24 Hour Footage = 9,250 Ft. 778 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #18-E 125273 Current Operation: Drilling .Summary of Last 24, Hot~r,,s:, Drilled the 12-1/4" hole to 9250'. Mud Type Low Solids Mud Weioht -- 9.9 #/gal Viscosity 38 Sec. P V YP.. i~L~Ij.Q_L¢_,~ Solids Temo 8 10 11.0 cc 11% 80 °F Survey Deoth Anale .0irection TVD N (+)/S (-) E(+)/W(-) Dog Leg Section Coordinate Coordinate °/100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: P. RUDHOE BAY UNIT As of 0600 Hrs. Fddav. October 5. 1990 WELL: $-2~ (42-27-12-12) AP! No. 50-029-22082 Day: 13 Depth at 0600 Hrs. = 24 Hour Footage = 9.725 Ft. 47,5 Ft. Current Operation' Drilling 12-1/4" hole. Summary_ of Last 84 Hours' Ddlled and surveyed 12-1/4" hole to 9725'. Rig: ArE Number: ArE Amount = Current Costs = Estimated Final Cost = Na, bor~, Rig #,! 8-E 125273 Mud Tvoe Mud Weiaht Viscosity Low Solids 9.8 #/gal 38 Sec. P V YP F,!uid Loss Solids 8 11 6.8 cc 10% N (+)/S (-) E(+}RV(-) Section Coordinate ,Coordinate TemD 76 OF Dog Leg °I1OO' Reviewed By: SS RECEIVED FEB - 4 t99~ Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Mond~_v. October 8. 1990 WELL: $-2~ (42-27-12-12) AP! No. 50-029-22088 Day: 1.6 Depth at 0600 Hrs. = 10,942 Ft. 72 Hour Footage = 1,217 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig #18-E 125273 Current O0erati(~n: RIH with 9-5/8" casing. Summary of Last 72 Hours; - Ddiled the 12-1/4" hole to 10942'. RIH with 9-5/8" casing Mud Ty0e Mud Weight Viscosity Low Solids 9.8 #/gal 41 Sec. pv YP Fluid Loss Solids 13 1 0 6.2 cc 10% Temp 92 OF Angle .QJ.[.e..c,..t. Lg~ TVD N (+)IS (-) E(+)/W(-) Section Coordinate Coordinate Dog Leg o/100' Reviewed By' SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Tuesday. October 9. 1990 WELL: $-~3, (42-27-12-]2), Day: !.7 Depth at 0600 Hrs. = 24 Hour Footage = 10,942 Ft. OFt. PRUDHOE BAY UNIT AP! No. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = 50-029-22088 Nabors Rig #18-E 125273 Current Operation: RIH with 8-1/2" bit. Summary of Last 24 Hours: Ran and cemented the 9-5/8" casing at 10928'. Running in hole with 8-1/2" bit. Mud Type Mud Weiaht Low Solids 8.5 #/gal Viscosity BV yp Fluid Loss Solids 30 Sec.~- 1 1 cc 1% Temo oF Survey Deoth Anale ~ -- N (.+)IS (-_) E(+)/W(-) Section Coordinate Coordinate Dog Leg 01100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday. October 11. 1990 WELL: S-23 (42-27-12-12) APl No. 50-029-22082 Day: ! 9 Depth at 0600 Hrs. -- 11.634 Ft. 24 Hour Footage = 1 41 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = ,.N,,abors Rig #18-E 12527:~ Current OperatiQn' POH for logs. Summa~ry Qf ,Last ,..24 Hours' Drilled the 8-1/2" hole to 11,634'. Attempted logs. Couldn't get past 10,937'. Made cond. trip. Mud'r'_voe Mud Weight Viscosity p V yp Fluid Loss Solids Low solids 8.9 #/gal 35 Sec~. 4 6 11.0 cc 4.5% Temp 90 OF Survey De.otb Angle D.~ TVD N (+)/S (-) ,E(+)/VV(-) Section Coordinate Coordinate Dog Leg o/100' Reviewed By: /¢~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday. October !0.1990 WELL: $-23 (42-27-12-12) AP! No. 50-029-22088 Day: 1~ Depth at 0600 Hrs. = 11,493 Ft. 24 Hour Footage = 551 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nab0r$ Rig #18-E 12.5273_ Current Ooeration: Drilling Summary of Last 24 Hours: Drilled out cement. Drilled the 8-1/2" hole to 11493'. Mud Type Mud Weiaht Viscosity Low Solids ' 8.9 #/gal 36 Sec. P V YP IE!IzLd_t.9_~ Solids Temo 5 6 11.0 cc 5% 90 °F Survey Deoth /~ngle g.J.~73,[QJ3. N (+)/S (-) E(+¥W(-) Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHQE, BAY UNIT. As of 0600 Hrs. Friday, October 12. 1990 WELL: S-23 (42-27-!2,-!2~ APl No. ~.0-029-22082 Day: 2Q Depth at 0600 Hrs. = !.1.634 Ft. 24 Hour Footage = O Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig, #18-E 125273 Current Ooeration' CBU. St~mma, ry of Last 2.4., Hours: Ran logs. Couldn't get past bridge at 10,937'. Logged well with MWD. Mud 'f'vDe Mud Weiaht - . v Low Solids 8.9 #/gal .V. jc.c,,~.L~ P V YP 65 Sec. 8 10 lJ~_!.u.i.~LJ.Q.~ Solids Temp 7.0 cc 4.5% 90 °F Survey ~ Angle N (+)/S (r) E(+)/W(,) Dog, Leg Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday. October 15. 1990 WELL: S-23 (42-27-12-12) AP! No. 50-029-22088 Day: 23 Depth at 0600 Hrs. = 11,624 Ft. 72 Hour Footage = 0 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Ria #18-E -- 125273 Current Operation: Running casing logs. Summary of Last 72 Hours' Ran and cemented 7" liner at 11624'. Cleaned out cement. casing logs. Displaced mud with brine. RIH with Mud 'Type Mud Weight Viscosity P ¥, Brine 8.5 #/gal Sec. Survey Deoth Angle Direction TVD yp Fluid Loss Solids Temo cc °F N (+)/S (-) Ef+)/Wf-)_ Dog Leg Section Ooordinate Coordinate °/100' Reviewed By: SS REEEIVED FEB - 4 t991 Alaska.Oil & Gas Cons. Commission ~chorage BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday. October 16. 1990 WELL: $-23 (42-27-12-12) APl No. ,~0.-029-22088 Day: 2.4 Depth at 0600 Hrs. = 24 Hour Footage = 11,624 Ft. _QR. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #18-E 125273 Current Operation: Install X-Mass tree. Summary 0f Last 24 Hours' Completed casing logs. Ran 4-1/2" tubing. Mud Type Mud Weight Brine 8.5 #/gal ~iscosity Sec. pV yp Fluid Loss Solids CC Temp oF Survey Depth Angle Direction TVD N (+)/S (.) E(+)/W{-) ~ Co0rCnate Coordinate Dog Leg o/100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday. October 17. 1990 WELL: S-23 (42-27-12-12) AP! No. 50-029-22088 Day' 25 Depth at 0600 Hrs. = 11,624 Ft. 24 Hour Footage = O Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = NabQr~ Rig #18-E 125273 Current Operation' Summa _ry of Last 24 Hour~;: Tested wellhead and tubing packer ok. Placed Diesel in the tubing annulus. Released rig at 13:00 hrs. MudTy.oe Mud Weight Viscosity PV YP Fluid Lo~ Solids Temo #/gal Sec. cc °F N (+)/S (-) E{+),/W(-) Dog Leg Survey Death Angle Direction TVD Section Coordinate Coordinate °/100' Reviewed By: SS WELL No. S-23 LAT. - 70'21'12.988" LONG. '- 149'01'58.146" Y = 5,979,855.08 A.S.P. X -- 619,105.67 ZONE 4 1631' FROM NORTH UNE 9¢5' FROM WEST LINE (MILES) SURVEYOR'S CERTIFICATE I hereby certify that I em properly registered and licensed to practice land surveying in the State of Alaska, and that this plat represents a survey made by me Or under my supervision, and that all dimensions and other details :~re Correct. . Date:.SEPT.'i'13,''t990 iLS'No. '~ 7535 ~- Registered Land ~rVeyor WELL PAD "S" WELL No. S-23 ASBUILT LOCATED IN PROTRACTED SECTION ,35, TOWNSHIP 12 NORTH, RANGE 12 EAST, UMIAT MEREDIAN, ALASKA SURVEYED FOR: B.P. EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 '' St.l~O BY: ARCTIC SLOPE CONSULTING OROUP 6700 ARCTIC SPUR ROAD ne,~ aY' ANCHORAGE, ALASKA 99518 KVc 9/~o/9o 26 35 35 26 943' · ' 28 7 8 9 ... o o 10 11 I T12N T11N NO SCALE WELL PAD "S" 55 35 2 PADS-23X SURVEYED BY: ARCTIC SLOPE CONSULTING CROUP 6700 ARCTIC SPUR ROAD ANCHORAGE, ALASKA 99518 DRAWN BY: KMC IDATE: 9/13/90 I i i SURVEYED FOR: B.P. EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 WELL No. S-25 ASBUILT LOCATED IN PROTRACTED SECTION .35, TOWNSHIP 12 NORTH, RANGE 12 EAST, UMIAT MEREDIAN, ALASKA Teleco Oilfield Sf es Inc. 6116 Nielson way. Anchorage, AK 99518 (907) 562-2646 October 19, 1990 JOB ~781 BP EXPLORATION (ALASKA) INC. WELL: S-23 PRUDHOE BAY RIG: NABORS 1SE Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning t.hese surveys or any of our other services. Sincerely, Eric $. Brown Field Operations Supervisor ESB/ng Enclosures r)ate ~ oO RE .EIYED Alaska Oil & Gas Cons. Anchorage i A S~NAT COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 18 OCT 90 'Company: BP EXPLORATION ~Well: S-23 Location: PRUDHOE BAY Rig: NABORS 18E TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 781TAK 0.0° 30.0° 30.0° 340.8° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* TIE-IN TO SURFACE 0 0 0.0 167.0 0.01 0.01 0.01N 0.01E 0.01 N 45.00E 0.00 TELECO MWD SURVEYS 474 474 0.8 167.0 474.00 -3.12 3.05S 0.72E 3.14 S 13.21E 0.16 987 513 0.3 354.0 986.98 -5.37 5.21S 1.35E 5.38 S 14.57E 0.19 1495 508 0.3 245.0 1494.98 -4.40 4.58S 0.23E 4.58 S 2.93E 0.08 2005 510 0.5 265.0 2004.97 -3.97 5.24S 2.99W 6.03 S 29.71W 0.05 PAGE 1 Compan¥~ Bp EXPLORATION, Well: S,23, Location: PRUDHOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg ..~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 2504 499 0.3 64.0 2503.97 -3.30 4.95S 4.18W 6.48 S 40.17W 0.15 2748 244 0.7 261.0 2747.96 -2.98 4.95S 5.18W 7.16 S 46.25W. 0.39 2841 93 2.2 311.6 2840.93 -1.32 3.86S 7.07W 8.05 S 61.39W 1.98 2934 93 4.4 319.0 2933.77 3.55 0.02N 10.75W 10.75 N 89.88W 2.40 3039 105 6.5 320.7 3038.29 12.88 7.66N 17.15W 18.79 N 65.93W 2.01 ~.3135 96 8.5 321.1 3133.47 24.66 17.39N 25.05W 30.49 N 55.23W 2.08 3230 95 10.9 326.4 3227.10 39.97 30.34N 34.43W 45.89 N 48.62W 2.69 3324 94 12.8 329.9 3319.10 58.81 46.75N 44.57W 64.59 N 43.64W 2.16 3419 95 15.8 337.6 3411.15 82.06 67.82N 54.78W 87.18 N 38.93W 3.73 3513 94 18.7 337.6 3500.91 109.89 93.59N 65.40W 114.18 N 34.95W 3.09 3607 94 21.2 338.0 3589.26 141.92 123.28N 77.51W 145.63 N 32.16W 2.66 3700 93 23.3 337.3 3675.34 177.08 155.85N 90.91W 180.42 N 30.26W 2.28 3796 96 25.6 336.2 3762.72 216.71 192.34N 106.61W 219.91 N 29.00W 2.44 3890 94 28.8 334.5 3846.32 259.47 231.37N 124.56W 262.77 N 28.29W 3.50 PAGE 2 Company: BP EXPLORATION, Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E 'Meas Course True Vertical Coordinates Closure Dog Leg .~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity ~eet feet deg deg feet feet feet feet feet deg deg/100' 3985 95 31.7 335.2 3928.37 307.06 274.69N 144.88W 310.56 N 27.81W 3.08 4080 95 34.7 334.8 4007.86 358.81 321.83N 166.87W 362.52. N 27.41W 3.17 4174 94 37.4 336.2 4083.85 413.88 372.17N 189.79W 417.77 N 27.02W 3.00 4269 95 40.3 335.9 4157.83 473.26 426.62N 213.98W 477.28 N 26.64W 3.06 4365 96 42.0 335.5 4230.11 536.19 484.20N 239.98W 540.41 N 26.36W 1.80 4460 95 44.8 335.9 4299.12 601.20 543.69N 266.83W 605.64 N 26.14W 2.95 4554 94 46.8 336.2 4364.65 668.36 605.28N 294.19W 672.98 N 25.92W 2.14 4650 96 46.8 336.2 4430.36 738.11 669.31N 322.43W 742.92 N 25.72W 0.00 4743 93 47.0 336.6 4493.90 805.82 731.54N 349.61W 810.79 N 25.54W 0.39 4838 95' 47.5 336.6 4558.38 875.40 795.56N 377.32W 880.51 N 25.37W 0.52 4933 95 48.3 337.3 4622.07 945.73 860.42N 404.92W 950.94 N 25.20W 1.00 5028 95 49.0 337.6 4684.83 1016.93 926.29N 432.27W 1022.19 N 25.02W 0.78 5120 92 49.2 337.6 4745.06 1086.36 990.59N 458.77W 1091.67 N 24.85W 0.21 PAGE 3 Compa.n.¥:. Bp EXPLORATION, Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg depth Length Incl Azi Vert. Dp. Section N/S 'E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 5216 96 50.7 338.3 4806.83 1159.75 1058.70N 486.35W 1165.07 N 24.67W 1.66 5311 95 51.4 338.7 4866.55 1233.58 1127.44N 513.43W 1238.84 N 24.48W 0.81 5403 92 51.7 339.0 4923.76 1305.58 1194.64N 539.42W 1310.77 N 24.30W 0.42 5495 92 50.5 338.0 4981.53 1377.12 1261.26N 565.64W 1382.29 N 24.15W 1.55 5590 95 49.7 338.7 5042.47 1449.94 1329.00N 592.52W 1455.10 N 24.03W 1.01 .5685 95 49.7 339.4 5103.91 1522.35 1396.66N 618.43W 1527.45 N 23.88W 0.56 5780 95 48.5 339.0 5166.11 1594.13 1463.79N 643.92W 1599.16 N 23.74W 1.30 5876 96 48.3 339.0 5229.85 1665.88 1530.81N 669.63W 1670.87 N 23.63W 0.21 5971 95 47.8 338.7 5293.36 1736.50 1596.71N 695.12W 1741.46 N 23.53W 0.58 6066 95 47.4 338.3 5357.41 1806.59 1661.98N 720.83W 1811.57 N 23.45W 0.52 6160 94 46.8 338.0 5421.40 1875.38 1725.90N 746.45W 1880.40 N 23.39W 0.68 6254 94 46.1 338.3 5486.17 1943.43 1789.13N 771.80W 1948.51 N 23.33W 0.78 6337 83 46.4 338.3 5543.56 2003.33 1844.84N 793.97W 2008.44 N 23.29W 0.36 PAGE 4 Company: BP EXPLORATION, Well: S-23, Location: PRUDHOE..BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg ~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 6443 106 46.1 337.6 5616.86 2079.81 1915.81N 822.72W 2084.99 N 23.24W 0.55 6536 93 46.4 338.0 5681.17 2146.90 1978.01N 848.09W 2152.16 N 23.21W 0.45 6630 94 46.8 337.6 5745.76 2215.10 2041.25N 873.89W 2220.45 N 23.18W 0.53 6722 92 46.8 337.6 5808.74 2282.06 2103.25N 899.45W 2287.51 N 23.15W 0.00 6817 95 46.4 337.3 5874.01 2350.97 2167.00N 925.92W 2356.53 N 23.14W 0,48 ~6913 96 46.7 337.6 7009 96 46.8 336.8 7102 93 46.8 335.9 5940.03 2420.54 2231.36N 952.65W 2426.22 N 23.12W 0.39 6005.81 2490.33 2295.82N 979.74W 2496.14 N 23.11W 0.62 6069.48 2557.91 2357.92N 1006.94W 2563.93 N 23.12W 0.71 7196 94 46.9 336.6 6133.76 2626.28 2420.69N 1034.56W 2632.50 N 23.14W 0.55 7290 94 47.1 336.'6 6197.87 2694.84 2483.79N 1061.86W 2701.25 N 23.15W 0.21 7383 93 46.8 336.2 6261.36 2762.60 2546.06N 1089.07W 2769.21 N 23.16W 0.45 7479 96 46.8 335.9 6327.07 2832.34 2610.02N 1117.48W 2839.18 N 23.18W 0.23 7575 96 46.9 336.6 6392.73 2902.16 2674.12N 1145.68W 2909.22 N 23.19W 0.54 PAGE 5 _Company: BP EXPLORATION,...Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg ~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity ~eet feet deg deg feet feet feet feet feet deg deg/100' 7669 94 46.6 335.9 6457.14 2970.41 2736.79N 1173.26W 2977.68 N 23.20W 0.63 7763 94 46.1 336.6 6522.02 3038.21. 2799.05N 1200.65W 3045.69 N 23.22W 0.76 7857 94 45.7 336.2 6587.44 3105.51 2860.90N 1227.67W 3113.19 N 23.23W 0.52 7953 96 45.6 336.2 6654.54 3173.94 2923.71N 1255.38W 3181.83 N 23.24W 0.11 8046 93 45'2 335.5 6719.84 3239.91 2984.14N 1282.47W 3248.04 N 23.26W 0.69 ...8141 95 44.6 335.5 6787.14 3306.68 3045.16N 1310.28W 3315.09 N 23.28W 0.63 8235 94 43.8 335.2 6854.53 3371.92 3104.72N 1337.61W 3380.60 N 23.31W 0.88 8332 97 43.8 336.2 6924.54 3438.79 3165.91N 1365.23W 3447.73 N 23.33W 0.71 8426 94 44.1 336.2 6992.21 3503.81 3225.60N 1391.56W 3512.96 N 23.34W 0.32 8522 96 44.0 336.9 7061.21 3570.38 3286.84N 1418.13W 3579.72 N 23.34W 0.52 8618 96 43.9 336.6 7130.31 3636.85 3348.06N 1444.43W 3646.35 N 23.34W 0.24 8712 94 43.6 337.3 7198.22 3701.70 3407.87N 1469.88W 3711.35 N 23.33W 0.61 8807 95 43.9 337.6 7266.84 3767.29 3468.54N 1495.07W 3777.04 N 23.32W 0.38 PAGE 6 Company: BP EXPLORATION, ...... Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg ~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg .deg/100' 8902 95 43.9 338.3 7335.29 3833.08 3529.59N 1519.80W 3842.89 N 23.30W 0.51 8997 95 44.3 339.0 7403..52 3899.14 3591.17N 1543.86W~ 3908.97 N 23.26W 0.67 9033 36 44.6 338.7 7429.22 3924.34 3614.68N 1552.96W 3934.16 N 23.25W . 1.03 9123 90 45.4 339.4 7492.86 3987.95 3674.12N 1575.71W 3997.75 N 23.21W 1.05 9219 96 46.1 339.7 7559.84 4056.70 3738.55N 1599.73W 4066.43 N 23.17W 0.76 9313 94 47.3 339.4 7624.31 4125.09 3802.64N 1623.64W 4134.77 N 23.12W 1.30 9409 96 47.9 340.4 7689.04 4195.97 3869.22N 1648.00W 4205.56 N 23.07W 0.99 9504 95 48.5 341.1 7752.36 4266.79 3936.08N 1671.34W 4276.22 N 23.01W 0.84 9599 95 49.5 341.5 7814.69 4338.48 4003.99N 1694.33W 4347.72 N 22.94W 1.10 9693 94 50.3 341.1 7875.24 4410.38 4072.10N 1717.38W 4419.43 N 22.87W 0.91 9787 94 50.5 341.1 7935.15 4482.81 4140.62N 1740.84W 4491.69 N 22.80W 0.21 9882 95 49.2 341.5 7996.41 4555.42 4209.40N 1764.12W 4564.12 N 22.74W 1.41 9977 95 48.6 342.9 8058.86 4626.98 4277.55N 1786.01W 4635.44 N 22.66W 1.28 PAGE 7 Company: BP EXPLORATION, Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg ,~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 10072 95 48.3 343.2 8121.87 4698.02 4345.56N 1806.74W 4706.19 N 22.58W 0.39 10167 95 47.7 343.9 8185.44 4768.54 4413.27N~ 1826.73W 4776.39 N 22.49W 0.84 10262 95 47.0 343.9 8249.79 4838.31 4480.41N 1846.11W 4845.84 N 22.39W 0.73 10324 62 46.2 344.3 8292.39 4883.29 4523.73N 1858.45W 4890.61 N 22.33W 1.39 10418 94 46.3 345.0 8357.39 4951.04 4589.21N 1876.42W 4958.01 N 22.24W 0.56 10514 96 46.1 345.4 8423.84 5020.12 4656.20N 1894.12W 5026.72 N 22.14W 0.36 10608 94 46.4 346.4 8488.84 5087.75 4722.06N 1910.66W 5093.96 N 22.03W 0.83 10703 95 46.2 347.5 8554.48 5156.04 4788.97N 1926.17W 5161.81 N 21.91W 0.86 10799 96 46.1 349.6 8620.99 5224.63 4856.81N 1939.91W 5229.90 N 21.77W 1.58 10872 73 45.9 351.0 8671.70 5276.42 4908.57N 1948.75W 5281.26 N 21.65W 1.42 10960 88 46.3 353.8 8732.72 5338.52 4971.41N 1957.13W 5342.78 N 21.49W 2.33 11054 94 46.4 354.1 8797.61 5404.75 5039.05N 1964.30W 5408.37 N 21.30W 0.26 11147 93 45.4 354.8 8862.33 5469.65 5105.52N 1970.76W 5472.68 N 21.11W 1.20 PAGE 8 Company.: BP EXPLORATION, Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 11242 95 45.3 354.5 8929.09 5535.27 5172.81N 1977.06W 5537.75 N 20.92W 0.25 11336 94 45.7 354.1 8994.98 5600.46 5239.52N 1983.72W 5602.48 N 20.74W 0.52 11400 64 45.9 356.6 9039.60 5644.86 5285.25N 1987.44W 5646.57 N 20.61W 2.82 PAGE 9 TE _-CO OClfield SePvic. ~ PLAN VIEW 6400 BP EXPLORATION S-23 PRUDHOE BAY NABORS ¢8E JOB# 781TAK/O0 SCALE: ~ inch = BO0 '~400 i ~1242 ~0960 ' ~0703 ~.04:1.8 :1.0 ! 67 9882 ' ~ 9599 ' _~_ 93't3 ' _~ 8997 ' ~ 87 ~.2 ' ~ 8426 ' ~ 8~4~- ' ~ 7857 ' ~ 7290 ' ~ 6~22 ' ~ 6443 ' ~ 6~_60 ' ~ 5876 ' ~ 53~ ' ~ 5028 4743 4 ~74 ~7~6, feet 5600 4800 4O00 3200 2400 1600 800 8OO 4000 3200 2400 WEST · 8OO 8OO 2O0O 4000 .~5000 08000 >10000 12000 ~4000 15000 18000 -lO00 ,, ;~LECO Oilfield Sepvi~ VER T I C AL PROJECT T ON lO00 3000 5000 7000 9000 11000 474 ' .75 deg 987 ' .25 deg i495 ' .25 deg 2005 ' .5 deg 2504 ' .25 deg 2934 ' 4.4 deg BP EXPLORATION S-23 PRUDHOE BAY NABORS 1 BE JOB# 78iTAK/O0 L83419 ' 15.8 deg SCALE: so · 28.8 ~g 1 inch = 2000 feet 460 . 44.8 deg ' :t,k~20 ' 49.2 deg , 78o ' 48.5 deg ~%~443 " 46.1 deg % 102 · 46.8 deg ~763' 46., deg ~8~32' 43.8 deg · ~902 ' 43.9 deg 04 ' 48.5 deg ~?i67' 47.7 deg VERTICAL SECTION (ft) · ORIGINA~ ?o J~ UIDANcE ~ ONTINUOus ~OOL SUB. SURFA C£ DIRECTIONAL SURV£y Company ~ ECEIVED ~ FEB - 4 t991 ~ 15-0ct-90 KOHRZNG * SCHLUMBERGER * GCT DIRECTIONAl SURVEY CUSTDMER LISTING FOR BP EXPLORATION S-23 (4Z-IT-II-12) PRUDHOE BAY NORTH SLOPE, ALASKA SURVEY DATE: 15-OCT-gO ENGINEER: SCHWARTZ METHODS OF COMPUTATION TOOL LOC~TION: TANGENT[4L- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. P~OJECTED ONTO A TARGET AZIMUTH OF NORTH 21 DEG 31 MIN W~ST Cg~PUTATIgN DATE: 30-OCT-90 PAGE BP EXPLORATION S-23 (42-27-1Z-12) PRUDHDE BAY NORTH SLOPEr ALASKA INTERPOLATEO VALUES FgR EVEN 100 TRUE SUB-SEA MEASURED VER'TICAL VERTICAL DEPTH D=PTH~_ DEPTH 0.00 0,00 -6¢,56 100,00 100.00 35,¢4 200,00 200.00 135,44 300.00 300.00 235.44 400.00 400.00 335.44 500°00 500.00 435.44 600.00 600.00 535.44 7OD,D0 700.00 635.44 800.00 800.00 735.44 900.00 900.00 835.44 1000,00 lO00.OO 1100,00 1100.00 ,lZO,O.O0 1200,00 1300.00 1300.00 1400.00 1400.00 1500,00 1500,00 1600,00 1500,00 1700.00 1700.00 1800.00 1800.00 1900.00 1899.99 ZO00.O0 1999.98 2100.00 2099.98 2200.00 2199.98 2300.00 22'99,98 2400.00 2399.99 2500.00 2499.98 2600,00 2599.98 2700,90 2699.95 Z800.O0 2799.98 2900.00 2899.91 3000,00 2999,62 3100,00 3098,95 3200,00 3197,75 3300.00 3295.88 3400.00 3393.03 3500.00 34,98.80 3600.00 3592.98 3700.00 3675.65 3800.00 3766.39 3900.00 3855.03 D,~TE OF SURVEY: KELLY BUSHING ELEVATION: ~EET OF MEASURED DEPTH 935.44 1035.44 1135.44 1235.44 1335.44 1435.44 !535.44 1635..44 1735.44 1835.43 COURSE VER'TIC4L DOGLEG DEVIATION AZIMUTH SECTION SEVERITY DEG M'IN DEG MIN FEET OEG/IO0 1935.42 2035.42 2135.42 2235.42 2335.42 2435.42 2535.42 2635.42 2735.42 2~35.35 0 0 N 0 g E 0.00 0 14 S 54 4'I W 2.06 0 16 S 53 55 E -0.24 0 16 S 16 58 E -0.53 0 9 S I0 15 E -O.~Z 0 11 S 24 43 E -1.38 0 13 S 15 33 E -I,71 0 9 S 2.3 15 W -1.86 0 3 N 16 28 W -1,98 0 4 S 49 19 ,E -2,02 2935.06 3034.39 3133.19 3Z31.32 3328.47 3424.24 3518.42 3611.09 3701.83 3790.47 0 3 S 75 4'3 W -1.98 0 3 N 36 42 E -2.04 0 4 S 16 52 W -Z.O0 0 4 N 24 23 E -2.05 0 3 S 19 45 W -l.99 0 5 N 60 44 E -2.07 0 5 N 54 26 W -1.95 0 6 S 2 2~ W -1.98 0 10 S 39 29 W -2,14 0 42 S 59 1Z W -2.15 0 29 S 71 15 W -2.17 0 3 S 85 44 W -2.13 0 lO N ~1 17 W -2.04 0 5 S 64 49 W -1.95 0 3 S 75 21 E -1.98 0 5 N 3 46 W -1.94 0 10 N 22 18 W -1,68 0 5 N 33 52 W -1.49 1 1 N 74 11 W -0.99 3 10 N 47 40 W 1.93 ENG!N~ER: 5 30 N 37 38 W 8.98 7 47 N 37 54 W 20.01 10 3 N 35 54 W 34.92 1Z 15 N 30 27 W 53.58 15 7 N 24 42 W 77.05 18 20 N 23 28 W 105.76 ZO 58 N 22 58 W 139.34 23 16 N 23 32 W 176.87 26 9 N 24 59 W 218.81 29 10 N 26 12 W 264.95 RECT4NGUL.AR COORDINATES HORIZ, NORTH/SOUTH EAST/WEST DIST, mEET FEET ~EET 0.00 0.25 0.51 0.39 0.28 0.33 0.37 0.14 0.22 0.24 O.O0 N 0.00 E 0.00 0.01 N O.1Z W 0.13 0.33 S 0.1'8 W 0.38 0.54 S 0.08 E 0.55 0.89 S 0.27 E 0.93 1.33 :S 0.3'9 E 1.38 1.67 S 0.42 E 1.72 1.84 S 0.41 E 1.89 1.96 S 0.41 E 2.01 2.0~ S 0.36 E 2.07 0.00 0.00 0.17 0.00 0.00 0.13 0.09 0.00 0.75 0.00 1.99 S 0.36 E 2.02 2.04 S 0.37 E 2.08 2.03 S 0.33 E 2.05 2.04 S 0.40 ~ 2.08 2.00 S 0.35 E 2.03 2.05 S 0.44 E 2,09 1.92 S 0.46 E 1.97 1.9"-) S 0.37 E 2.02 2.15 S 0.3'7 E 2.18 2.50 S 0.49 W 2.54 0.73 0.20 0.00 0 · 06 0.00 0.00 0.00 0.00 1.65 3.18 2.92 S 1.51 W 3.29 3.04 S 1.92 W 3.59 2.99 S 2.03 W 3.61 2.9-9 S 2.27 W 3.75 3.03 S 2.28 W 3.79 2.95 S Z.2Z W 3.70 2.70 S 2.27 W 3.53 2.52 S 2.34 W 3.44 2,25 S 3.02 W 3.75 0.29 S 6,03 W 6.01 2.40 2.26 2.71 2.35 2.08 2.75 2.47 3.39 2.09 3.21 5.34 N 10.94 ~ I2.15 14.38 N 15.09 W 23.11 26.59 N 27.50 W 38.25 42.52 N 38.22 W 57.18 63.44 N 49.18 W 80.27 89.75 N 60.72 W 105.35 120.62 N 73.95 W 141.49 155.19 N 88.59 W 178.70 193.38 N 106.10 W 220.57 235.08 N 126.10 W 266.77 15 OCT-90 64.56 FT SCHW ~RTZ DEPARTURE AZIMUTH OEG MIN N 0 0 E N 83 31 w S 28 8 w S 75.5 E S 16 51 E S 15 I8 E S 14 18 E S 1Z 31 E S 11 53 E S 9 55 E S 10 7 E S 10 ZO E S 9 12 E S 11 6 ~ S 10 3 ~ S 1Z 6 E S 13 30 E S 10 31 E S 9 .~9 E S lO 50 W S 27 19 W S 32 15 W S 34 10 W S 37 13 w S 36 58 w S 36 52 w S 40 7 W S 42 50 W S 53 I9 W S 87 14 W N 63 59 W N 51 31 k N 45 58 W N 41 57 W N 37 47 W N 34 5 W N 31 31 W N 29 43 w N 28 45 W N 25 13 W COMPUTATION DATE: 30-OCT-g0 PAGE 2 BP EXPLORATION S-23 (42-27-12-123 PRUDHOE B&¥ NDRTM SLOPE, &LASKA OST~ OF SURVEY: 15-0CT-90 KELLY BUSHING ELEV4TI~N: 64.56 PT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED OEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MZN 4000.00 3941.11 3876.55 31 58 4100.00 4024.50 395'9.94 35 12 4200.00 4104.74 4040.18 38 0 4300.00 4181.86 4117.30 40 49 4400.00 4256.44 4191.88 42 52 4500°00 4328.13 4263.57 45 32 4600.00 4397°32 4332.76 46 40 4700.00 4465.95 4401.39 46 4'7 4800°00 4534.31 4469.75 46 4900.00 4602.17 4537.61 47 ENGINEER: SCHWARTZ 5000.00 4659.1,2 4604.56 48 20 5100.00 4735.0B 4570.52 49 1 5200.00 4799.86 4735.30 50 15 5300.00 4862.92 479 ~J. 36 51 ll 5400.00 4975.66 4861.10 51 10 5500.00 49138.75 4924.19 50 6 5600.00 5053.52 4988.96 49 34 5700.00 5118.65 5054.09 49 0 5800.00 51~4.94 5120.38 48 9 5900.00 5251.89 5187.~3 47 49 VERTICAL 30GLEG R~CTANGUL~R C30ROIN~TES HORIZ. DEPARTURE S~CTI~N SEVERITY NDRTH/SgUTH E~ST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET :EET FEET DEG MIN 6000.00 5319.35 5254.79 47 25 6100.00 5387.29 5322.73 46 58 6200.00 5456.06 5391.50 4~ 19 6300.00 5525.46 5460.90 45 45 6400.00 5594.95 5530.40 46 7 6500.00 5664.43 5599.87 46 2 6600.00 5733.68 5.669.12 46 18 6700.00 5802.72 5738.16 46 17 6800.00 5871.79 5807.23 46 19 6900.00 5940.B5 5876.29 46 22 N 25 37 W 315.67 N 25 19 W 370.71 N 25 ! W 430.24 N 24 59 W 493.77 N 25 5 W 560.25 N 24 39 W 629..84 N 24 32 W 701.93 N 24 25 W 774.57 N 24 7 W 84~.47 N 23 43 W 920.85 7000.00 5009.67 5945.11 46 35 7100.00 6078.32 6013.76 46 42 7200.00 5146.95 6082.39 46 44 7300°00 6215.33 6150.77 46 48 7400.00 5283.85 6219.29 46 44 7500.00 6352.39 6287.33 46 38 7600.00 5421.14 6356.58 46 33 7700.00 6489.94 6425.38 46 18 7~00.00 6559.40 6494.84 45 45 7900.00 6629.36 6564.80 45 26 N 23 15 W 995.09 N 22 54 W 1070.22 N 22 25 W 1145.38 N 22 15 W 1223.98 N 22 12 W 1301.3~ N 22 1~ W 1379.~3 N 22 35 W 1455.60 N 22 3~ W 1531.47 N 22 46 W 1606.33 N .22 49 W 1680.58 N 22 38 W 1754.39 N 22 23 W 1827.T6 N 22 27 W 1900.34 N 22 49 W 1'972.33 N 22 39 W 2044.21 N ZZ ~6 W 2116.12 N 23 3 W 218~.24 N ~3 9 W 2260.56 N 23 30 W 2332.~34 N 23 43 W 2405.12 N 24 2 W 2477.61 N 24 27 W 2550.24 N 24 3~ W 2622.B7 N 24 4~) W 2595.72 N 24 53 W 2768.43 N 24 42 W 2~41.13 N ~4 46 W 2913.63 N 24 34 W 2986.10 N 24 27 W 3057.94 N 24 21 W ~129.30 2.6? 2.90 3.06 1.93 2.43 2.00 0.52 0.40 0.51 1.21 280.84 N 148.3~ W 317.61 N 27 51 W 330.67 N 1TI.02 W 372.7,4 N 27 29 W 3'~4.68 N 197.33 W 432.34 N 27 9 W 442.37 hi 224.21 ',~ 495.94 N 25 53 W · 502.71 N 252.4~, W 562.53 N 26 40 W ~ 565.95 N 281.72 W 632.Z0 N 26 28 W 631.62 N 311.7:5 W 704.36 N 26 16 W ,597.82 N 341.86 W 777.06 N 26 6 W 764.34 N 371.8~ W 850.01 N 25 57 W 831.4~ N 401.66 W 923.42 N 25 :~'7 W I .22 1.21 1 0.73 0.36 2.78 0.53 1.58 0.76 0.60 899.6~ N 431.20 W 997.64 N 25 37 W 968.75 N 460.75 W 1072.73 N 25 26 W 1039.07 N 490.05 W 1148.83 N 25 15 W 1110.86 N 519.5.~ W 1226.34 N 25 4 W 1182.92 N 5~,9.02 W 1304.12 N 24 54 W 1254.77 N 578.32 W 1381.53 N 24 45 W 1325.17 N 607.44 W 1457.75 N 24 38 W 1395.21 N 636.6:5 W 11533.60 N 24 32 W 1464.37 N 665.31 W 1608.42 N 24 26 W 1532.83 N 694.12 W 1682.61 N 24 22 W 0.41 0.73 0.31 0.14 0.27 0.5~ 0.22 0.52 0.1~ 0.34 1600.91 N 722.67 W 1756.46 N 24 18 W 1658.71 N 750.73 W 1829.81 N 2~ 13 W 1735.84 N 778.38 W 1902.37 N 24 9 W 1802.29 N 806.07 W 1974.34 N 24 6 W 1868.60 N 833.87 W ~046.22 N 24 3 W 1934.97 N 861.59 W ?-118.12 N 24 0 W 2001.42 N 839.69 W Z190.Z5 N 23 5~ W 2067.97 N 918.05 W 2262.60 N 23 56 W 2134.38 N 946.$~ W 2334.91 N 23 55 W 2200.66 N 975.63 W 2407.23 N 23 55 W 0.32 0.28 0.2~ 0.60 0.16 0.65 0.27 0.71 0 °47 0.40 2267.02 N 1004.9.:5 W 2479.78 N 23 54 W 2333.32 N 1034.81 W 2552.49 N 23 55 W 2399.47 N 1055.04 W 2625.22 N 23 56 W 2465.77 N 1095.51 W 2698.15 N 23 57 W 2531.84 N 1136.17 W 2771.09 N 23 59 W 2597.95 N 1156.69 W 2843.82 N 24 0 W 2663.92 N 1187.03 W 2916.42 N 24 1 W 2729.85 N 1217.35 W 2959.00 N 24 2 W 2795.35 N 1247.13 W 3050.93 N 24 3 W 2860.39 N 1276.70 W 3132.33 N 24 3 W COMPUTATI3N D~TE: 30-gCT-90 ~AGE 3 BP EXPLgRATION $-23 (4 2-27-12-128 PRUOHOE BAY NORTH SLOPE, ~,LASKA INTERPDLATEO VALUES FOR EVEN 100 TRUE SUB-SE~ MEASURED VERTICAL VERTICAL DEPTH DEPTH OEPTM 8000.00 6699.66 8100.00 5770.43 8200.00 6842.21 8300.00 6914.60 8400.00 6986.89 8509.00 705~.93 8600.00 7131.03 8700.00 7203.3.4 8800.00 7275.90 8900.00 7348.13 9000.00 7420.2~ 9100.00 7491.61 9200.00 7561.9B 9300.00 7631.02 9400.00 '7698.80 9500.00 7765.93 9600.00 7831.91 9700.00 7896.68 9800.00 7960.82 9900.00 8025.59 10000.00 8091.95 10100.00 8158.87 10200.00 8226.53 10300.00 B295.17 lO~,OO.O0 8364.66 10500.00 8434.21 10600.00 8503.66 10700.00 8572.92 10800.00 8642.2~ "" 10900.00 9712.08 llOOO.O0 8781.5'~ 11100.00 8850.75 11200.00 3920.99 11300.00 8991.54 11400.00 9061.65 11500.00 9131.47 11600.00 9200.,85 11634.00 9224.43 DATE 3F SURVEY: KELLY ~USHING ELEVATICN: 6635.10 6705.87 6777.65 6850.04 6922.33 6994.37 7066.47 7138.78 7211.34 77H3.62 FEET DF ~EASURED DEPTH 7355.72 742 7.0 5 7497.42 7566.46 7634.24 7701.37 7767.35 7832.12 7'696.26 7961.03 COURSE VERTICAL DOGLEG DEVIATION AZIMUTH SECTION SEVERITY DEG MIN DEG MIN FEET OEG/IO0 8027.~0 8094.31 8161.97 8230.51 8300.10 B369.65 8439.10 850~.36 8577.72 8647.52 45 13 N 25 Z W 3200.32 44 33 N 25 45 W 3270.79 43 51 N 26 1 W 3340.22 43 33 N 25 55 W 3409.g0 43 49 N 25 37 W 3477.90 43 56 N 25 19 W 3547.09 43 50 N 2.4 46 W 3616.26 43 32 N 24 10 W 3685.24 4~ 35 N 23 49 W 3753.99 43 48 N 23 33 W 3823.05 8717.03 8786.Z0 8856.43 8926.98 8997.09 9066.9I 9136.29 9159.87 44 5 N 22 57 W 389Z.31 44 53 N ZZ 35 W 3962.38 45 41 N Z1 41 W 4033.42 46 57 N 21 14 W 4105.T6 47 36 N 21 5 W 4179.28 48 8 N ZO 15 W 4253.39 49 15 N 19 57 W 4321-3.51 49 56 N 19 42 W 440~.$6 50 11 N 19 3q W 4q, 81.34 48 55 N 18 47 W 4557.47 48 ,3 N 17 55 W 4632.15 47 42 N 17 33 W 4706.31 47 5 N I7 39 W 4779.77 46 13 N 17 1~ W 4852.31 45 55 N 16 55 W 4924.~1 45 59 N 16 19 W 4995.59 46 5 N 15 12 ~ 5067.17 ~+6 15 N 13 2~ W 5~3~.74 45 56 ~'3!1 41 W 520}.91 45 38 N 9 40 ~ 5280.23 ENGINEER: 46 2& N 8 29 W 5350.38 45 51 N 8 7 W 5420.71 45 9 N 7 4? W 5489.~9 45 17 N 7 53 W 5558.75 45 39 N 7 49 W 562~.04 45 4~ N 8 1] W 5697.65 46 5 N 8 21 W 5767.75 46 5 N 8 21 W 5791.60 RECTANGULAR COORDINATES HgRIZ. NORTH/SOUTH EAST/WEST DIST. FEET FEET FEET 0.79 1.17 0.34 0.46 0.35 0.32 0.41 0.42 0.?1 0.30 15-OCT-90 64.56 FT 0.84 0.80 1.0~ 1.01 0.36 1.30 0.58 0.45 0.56 1.5'7 SCHWARTZ 0.51 0.38 0.92 0.45 0.22 1.03 1.12 4.47 1.61 1.56 DEm~TURE AZIMUTH OEG M IN 0.89 0.92 0.16 0.46 0.55 1.06 0.00 0.00 2925.07 N 1306.30 W 3203.50 N 24 4 W 29,88.87 N 1336.62 W 3274.12 N 24 6 W 3051.50 N 1367.04 W 3343.72 N 24 8 W 3113.52 N 1397.26 W 3412.6~ N 2,4 10 W 31'75.75 N 1427.28 W 3481.74 N Z4 1Z W 3238.37 N 1457.08 W 3551.08 N 24 I4 W 3301.16 N 1486.40 W 3620.37 N 24 14 W 3364.0~ N 1514.99 W 3689.44 N 24 15 W 3416.9% N 1542.912 Vd 3758.25 N 24 14 W 3490.22 N 1570.69 W 3827.35 N 24 14 W 3553.88 N 1598.05 W 3896.64 3618.50 N 1625.17 W 3966.70 3694.31 N 1651.94 W 4037.71 3751.69 N 1678.29 W 4109.96 3820.24 N 1704.83 W 41B3.39 3889.56 N 1731.05 W 4257.38 3960.17 N 1756.75 W 4332.35 4031.82 N 1782.69 W 4408.3~ ~104.07 N 1808.50 W 448~.87 4175.99 N 1833.61 W 45'50.82 4246.98 N 1857.18 W 4635.29 4317.76 N 1879.84 W .4709.23 4387.96 N 1902.05 W ',,792.47 4457.34 N 1923.86 W 4854.81 4526.0'3 N 19~4.99 w 4916.29 4594.93 N 1965.52 w 4997.67 4664.1~ N 1985.00 W 5059.01 4734.06 N 2002.90 W 5140.33 4804.35 N 2018.63 W 5211.21 ~+874.73 N 2031.87 w 5281.24 N 24 13 W N 24 11 W N 24 9 W N 24 6 W N 24 3 W N 23 59 W N 23 55 W N 23 51 W N 23 ~7 W N 23 ~Z W N 23 37 W N 23 32 W N 23 26 W N 23 21 W N 23 15 W N 23 I0 W N 23 .~ W N 22 56 W N 21 47 W N ZZ 38 W 4945.75 N 2042.95 W 5351.09 N 22 27 W 5017.21 N 2053.4~ '~ 5421.18 N 22 16 W 5087.72 N 2053.23 W 54~0.15 N 22 4 W 5157.92 N 2072.90 ~ 5558.88 N 21 5& W 5228.56 N 2052.65 W 5628.0~ N 21 43 W 5299.45 N 2092.62 W 56:)7.65 N 21 33 W 5370.70 N 2103.01 W 5767.76 N 21 23 W 538~.94 N 2106.55 W 5791.63 N 21 20 W COMPUTATION DATE: 30-~CT-90 PAGE 4 BP EXPLDR~T'[ON S-23 (42-27-12-12) PRUDHOE BAY NORTH SLDPE, ALASKA DATE OF SURVEY: 15-0CT-90 KELLY 5USHZN~3 ELEVATION: 64.56 FT INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED OEPTH TRUE SUO-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION J, ZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG 0.00 0.00 -6&.56 0 0 1000.00 lO00.O0 935.44 0 3 2000.00 19~9.93 1935.¢2 0 29 3000.00 2999.62 2935.06 5 30 4000.00 3941.11 3876.55 31 58 5000.00 ~659.12 4604.56 48 20 6000.00 5319.35 525%.79 %7 26 7000.00 $009.67 5945.11 46 35 8000,00 6699.66 6635.10 45 13 9000.00 7420.28 7355.72 44 5 ENGIN!~ER: SCHWARTZ 10000.00 8091.96 8027.40 48 8 11000.00 8781.59 8717.03 46 24 11634.00 9224.43 9159.87 46 ~ VERTICAL DOGL~.G RECTANGULAR C~O~DINATES HDRZZ. DEPARTURE SECTION SEVERITY NSRTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET t=EET FE~T DEG MIN N 0 0 : 0.00 S 75 43 W -1.98 S 71 15 W -2.17 N 37 38 W 3.98 N 25 37 W 315.67 N 23 1!5 W 995.09 N 22 3,~ W 1754.39 N 24 2 W 2477.61 N 25 ~ W 3200.32 N 22 57 W 3892.31 N 17 5!5 W 4632.15 N 8 2'9 W 5350.3 8 N 8 21 W 5791.60 0.00 0.00 0.73 2.40 2.67 1.22 0.41 0.32 0.79 0.84 0.00 N 0.00 f 0.00 N 0 0 E 1.99 S 0.35 =' 2.02 S 10 7 ~. 2.92 S 1.51 W 3.29 S 27 19 W 5.34 N 10.94 ~ 12.1~ N 63 59 W - · 2',~0.84 N 14,8.34 ~ 317.61 N 27 51 ~ ) 899.64 N 431.2~ W 997,64 N 25 37 W 1600.91 N 722.67 W 1756.46 N 2~+ 18 W 2267.02 N 1004.95 W 2479.78 N 23 ~4 W 2925.07 N 1306.30 W 3203.50 N 24 4 W 3553.$8 N 1598.05 W 3896.6~, N 2~, 13 W 0.51 0.89 0.00 %246.9S N 1857.13 W 4635.2'~ N 23 37 W 4945.75 N 2042.95 W 5351.09 N 22 27 W 53'94.94 N 2105.55 W 5791.63 N 21 20 W C~MPUTATIgN DATE: 30-3CT-90 PAGE BP EXPLORATION $-23 (42-27-12-123 PRUDHOE B~Y NORTH SLOPEr ALASKA MEASURED DEPTH 0.00 64.56 164.56 264.56 364.56 464.56 564.56 664.56 764.56 864.56 96~: 56 1064.56 1164.56 1264.56 1364.56 1464.56 1564.56 1664.56 1764.56 1864.57 1964.57 2064.58 2164.58 2264.58 2364.58 2464.58 2564.58 2664.58 2764.5B 2864.61 1964.80 3065.32 3166.34 3268.00 337D.56 3474.52 35B0.30 3687.96 3797.96 3910.91 TRUE VERTICAL DEPTH 0.00 64.56 164.56 264.56 364.56 464.56 564.56 664.56 764.56 864.56 964.56 1064.56 1164.56 1264.56 1364.56 1464.56 1564.56 1664.56 1764.56 1864.56 1964.56 2064.56 2164.56 2264.56 2364.56 2564.56 2654.56 2764.56 2864.56 2964.56 30,64.56 3164.56 3264.56 3364.56 3464.56 3564.56 3664.56 3764.56 3864.56 INTERPOLATED VALUES FOR EVEN 100 SUB-SEA VERTICAL DEPTH -64.56 0.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 1200.00 1300.00 1.400.00 1500.00 1600.00 1700.00 1800.00 1900.00 2000.00 2100.00 2200.00 2300.00 2400.30 2500.00 2600.00 2?00.00 2900.00 CgURS~ DEVIATION AZIMUTH DEG MIN DEG MIN 0 0 N 0 0 E 0 11 N 86 23 w 0 15 S 6 39 E 0 9 S 40 39 E 0 12 S 36 50 E 0 19 S 21 51 E 0 15 S I 34 E 0 4 S ¢1 37 W 0 3 S ¢5 4 E 0 6 S 17 51W 0 4 N 23 41 W 0 4 S 593.3 E 0 3 N 894'9 W 0 4 N 91 40 E 0 3 N 87 22 W 0 5 S 73475 0 5 N 7 23 W 0 5 S 39 34 W 0 5 S 10 42 E 0 40 S 69 51 W 0 39 S 67 5 W 0 11 S 74 45 W 0 6 N 30 43 W 0 8 S q5 15 W 0 1 S 11 54 E D 4 N 18 4! ~ 0 10 N 13 0 W C 5 N 133'2 w O 3~ N 70 2~'~. W 2 20 N 54 17 W 2900.00 4 36 N 39 43 W 3000.00 6 58 N 38 43 W 3100.00 9 13 N 37 31 W 3200.00 11 23 N 33 39 W 3300.00 14 ZO N 26 20 W 340~.90 17 33 N 23 30 W 3500.00 20 27 N 23 3 W 3600.00 22 57 N 23 1~ W 3700.00 26 7 N 24 59 W 3800.00 29 31 N 26 12 W KELLY FEET OF SUB-SEa DEPTH VERTICAL DOGLEG RECTANGULAR SECTI3N SEVERITY NORTH/SOUTH FEET DEG/IO0 FEET 0.00 0.00 0.00 N 0.04 0.42 0.04 N -0.09 0.48 0.20 S -0.41 0.44 0.43 S -0.83 0.29 0.80 S -1.ZZ 0.41 1.19 S -1.55 0.36 1.51 S -1.83 0.37 1.79 S -1.98 0.22 1.97 S -1.98 0.09 1.9'9 S SURVEY' ELSV,~TIDN: CNG!NmER: C30RD'IN~TES EAST/WEST FEET 0.00 ~ O.OO E 0.25 W 0.03 = 0.22 6 0.32 E 0.4O E 0.45 E 0.40 E O. 35 E ORIZ. ST. ET 15-CCT-9O 64.56 F'T SCHWARTZ H 0.00 N 0 0 E 0.04 N 0 56 E .0.33 S 51 57 W 0.43 S 3 51 E 0.83 S 15 40 E 1.23 S 15 10 E 1.56 S 14 48 E 1.84 S 14 4 E 2.01 S 11 34 E 2.0.2 S 9 54 E -2.01 0.13 2.01 S 0.3.8 E 2.0~ -2.03 0.19 1.04 S 0.34 E 2.07 -2.00 0.00 2.01 S 0.35 r-_ 2.04 -2.06 0.00 Z.OT S 0.37 E 2.10 -I.99 0.11 1.9'9 S 0.38 E 2.02 -2.05 0.10 2.05 S 0.39 E 2.09 -2.00 0.00 1.96 S 0.48 E 2.02 -1.94 0.09 1.93 S 0.39 E 1.97 -2.09 0.03 2.0'9 S 0.39 E 2.13 -2.16 0.14 2.35 S 0.05 W 2.35 1.1! 1.85 1.94 2.21 2.30 2.2~ 2.24 2.32 2.55 4.71 3.03 3.54 3.5-') 3.70 3.74 3.53 3.45 ~.49 4.90 -2.17 -2.13 -2.09 - 1.96 -1. ~6 -1.98 -1.78 -1.54 -1.28 0.48 5.03 15.75 29.38 47.11 69.58 97.92 132.34 172.19 217.91 270.24 DEP4RTUR= AZIMUT~ OEG MIN 0.18 2.79 S 0.50 3.02 S 0.73 3. O1 S 0.16 2.97 S 0.14 3.01 S 0.19 3.01 S 0.00 2.80 S O. O0 2.57 S 1.83 2.38 S 1.47 1.35 S 2.52 2.92 N 1.86 10.89 N 2.72 22.05 N 4.20 36.94 N 3.41 56.67 N 3.42 82.55 N 3.08 114.18 N 2.99 150.89 N 2.07 192.56 N 3.05 239.85 N S 10 49 = s 9 S 9 55 E S la 5 E S 10 q. 8 E S 13 51E S 11 19 E S 10 39 E S 2 Z W S 22 5.3 w S 31 28 W S 32 ~+9 w S 36 35 W S 37 19 W S 36 27 w S 33 42 W S 4Z 3 W S 47 2 W S 74 4 W 9.02 W 9.49 N 72 3 W 15.33 W 18.80 N 54 37 W 24.14 W 32.73 N 47 34 W 34.7~ W 50.71 N 43 14 W ~,5.95 W 72.97 N 3'-~ 3 W 57.60 W 10C.66 N 34 ~4 W 71.22 W 134.57 N 31 57 W ~6.75 W 174.05 N 2~ 54 W 105.72 W 219.67 N Z3 46 W 128.45 W 272.08 N 28 10 W COMPUTATION DATE: 30-0CT-90 BP EXPLORATION S-23 (4Z-27-12-123 PRUDHOE BAY NORTH SLOPE, ALASKA TRUE MEASURED VERTICAL DEPTH DEPTH 4027.77 3964.56 4149.49 4064.56 4277.21 4164.56 4411.12 4264.56 4552.38 4364.56 4697.97 4464.56 4844°43 4564.56 4993.15 ~664.56 5145.20 4764.56 5302,.62 ~864.56 5461.96 4964.56 5617.00 5064.56 5769.42 5164.56 5918.85 5264.56 6066.65 5364.56 6212.30 5464.56 6356.17 5564.56 6500.18 5664.56 6644.73 5764.5.5 6789.54 5864.56 6934°40 5964.56 7079.94 6064.56 7225.71 6164.56 7371.85 6264.56 7517.73 6364.56 7663.17 6454.56 7807.39 5564.56 7950.13 5664.55 8091.76 6764.55 8230.96 6864.56 8369.07 6964.56 8507.81 7064.56 8646.44 7164.56 8784.36 7264.56 8922.69 7364.56 9061.91 7464.56 9203.70 7564.56 9349.33 ?664.56 9497.94 7764.56 9550.22 7864.56 INTERPOLATED VA SUB-SEA CgURS VERTICAL DEVIATION A DEPTH DEG MIN D LUES FOR EVEN 100 FEET OF KELLY 3900.00 32 45 N 400'0.00 36 35 N 4100.00 40 21 N 4200.00 43 8 N 4300.00 46 19 N 4400.00 46 47 N 4500.00 47 IZ N 4600.00 48 15 N 4700.00 49 34 N 4800.00 -51 11 N SU~-SE~ DEPTH 4900.00 50 55 N 5000.00 49 31 N 5100.00 48 17 N 5200.00 47 43 N 5300.00 47 8 N 5,400.00 46 17 N 5500.00 46 Z N 5600.00 46 2 N 5700.00 46 24 N 5800.00 46 19 N E VERTIC,~L DOGLEG RECTANGULAR ZIMUTH SECTION SEVERITY NORTH/SOUTH EG MI:N FEET DEG/IO0 FEET 5900.00 ,46 30 N 6000.00 46 42 N 6100.90 46 50 N 6200.00 46 46 N 6300.00 46 35 N 6400.00 46 33 N 6500.00 45 44 N 6600.00 45 21 N 6700.90 44 38 N 6800.00 43 42 N 25 28 W 330.51 2.89 25 5 W 39'9.71 2.68 24 57 W 478.96 2.28 25 ) W 567.83 2.50 24 34 W 667..42 1.47 24 25 W ?73.09 0.45 23 58 W 879.98 0.55 23 16 W 989.98 1.11 22 39 W 1104.47 1.42 22 14 W 1226.02 O.TT 6900.00 43 45 N 7000.00 43 55 N 7100.00 43 42 N 7200.00 43 30 N 7300.00 43 46 N 7400.00 44 36 N 7500.00 45 44 N 7500.00 47 21 N 7700.00 48 7 N 7800.00 49 40 N 22 11 W !350.07 1.62 22 38 W 1468.53 0.42 22 31 W 1583.53 1.1'9 !2 49 W 1694.54 1.22 22 26 W 1B03.35 0.41 22 29 W 1909.23 0.43 22 45 W 2012.64 0.50 22 46 W 2116.25 0.56 Z3 5 W 2220.59 0.41 !3 29 W 2325.28 0.20 23 47 W 2430.02 0.47 24 23 W 2535.66 0.29 24 39 W 2641.58 0.60 24 56 W 2747.96 0.28 24 41 W 2B54.00 0.26 24 41 W 2959.44 0.69 24 28 W 306).23 0.37 24 32 W 3164.94 0.75 25 42 W 3265.03 1.Z0 26 3 W 3361.57 0.95 25 42 W 3456.55 0.35 ~_5 17 W 3552.50 0.39 24 28 W 3648.34 0.67 :~3 50 W 3743.23 0.4.2 23 27 W 3838.74 0.39 12 45 W 3935.57 0.94 2l 39 W 4035.08 1.15 21 11 W 4141.92 0.49 lO 16 W 4251.~5 1.31 19 56 W 4366.65 1.18 294.26 N 356.97 N 428.92 N 509.59 N 600.18 N 696.47 N 794.07 N 894.94 N 1000.34 N 1112.75 N D~T= OF SURVEY' ,-, %,. . 5USHING ELEVATION: ENGINEER: COORDINATES HgRIZ. EAST/WEST gIST. mEET FEET 154.75 W 332.47 184.39 W 401.78 217.94 W 481.11 255.65 W 570.12 297.39 W 669.82 341.25 W 775.58 385.13 W 882.54 429.1,8 W 992.53 474.00 W 1106.96 520.30 W 12Z8.38 1227.59 N 557.21 W 1352.30 1337.11 N 512.41 W 1470.68 1443.32 N 656.5,4 W 1585.63 1545.70 N 699.53 W 1696.62 1646.14 N 741.42 w 1805.41 1744.05 N 7~1.78 W 1911.25 1839.47 N 821.69 W !014.66 1935.09 N 861.65 W 2118.25 2031.20 N 90Z.36 W 2222.62 2127.44 N 943.67 W 2327.34 2223.47 N 2320.03 N 2416.50 N 2513.24 N 2609.66 N 2705.60 N 2800.17 N 2892.89 N 2983.66 N 3070.75 N 3156.45 N 3243.27 N 3330.38 N 3417.08 N 3504.62 N 3593.76 N 3686.79 N 37~5.40 N 3888.12 N 3996.04 N PAGE 6 15-0CT-90 64.56 F'T SCHWARTZ · DEPARTURE AZIMUTH DEG N 27 44 W N 27 19 W N 26 56 W N 26 39 W N 26 21 w N 26 6 W N 25 52 W h 25 37 W N 25 Z~. W N 25 4 W N 24 48 W N 24 37 W N 24 ZB W N 24 Z1 W N 24 15 W N 2~+ 9 W N 24 4 W N 24 OW N 23 57 W N 23 55 W 1418.01 W 3450.34 N 24 11 W 1459.39 W 3556.4g N 2~+ 14 W 1499.7:~ W 3652.5,3 N 24 15 W 1538.57 ;~ 3747.49 N 24 14 W 1576.94 W 3~43.06 N 24 14 W 1614.84 ~ ~939.90 N 24 12 W 1652.92 W 4040.35 N 2~ 9 W 1691.~7 W 41~6.03 N 24 5 W 1730.53 W 4255.34 N 24 0 W 1759.79 W 4370.41 N 23 53 W 9~5.67 W 2432.15 N 23 54 W 1028.78 W 2537.90 N 23 55 W 1072.84 W 2643.95 N 2.3 56 W 1117.53 W 2750.50 N 23 58 W 1162.07 W 2856.70 N 24 0 W 1206.23 W 2962.31 N 24 2 W 1249.32 W 3066.23 N 24 3 W 1291.45 W 3168.07 N 24 3 W 133~.I1 W 3268.34 N 24 5 W 1376.44 W 3355.13 N 24 9 W COMPUTATION DATE: 30-OCT-90 PAG'~ 7 BP EXPLORATION S-23 (42-27-12-12) PRUDHOE BAY NORTH SLOPE~ ALASKA DATE OF SURVEY: 15-0CT-90 KELLY 5USHINS ELEVATION: 64.56 PT ENGINEER: SCHWARTZ INTERPOLATEO VALUES FOR EVEN 100 FEET OF SUS-SEA OEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH OEPTH DEG MIN DEG M[N VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. OEPARTURE SECTION SEVERITY NORTH/SOUTH E&ST/WEST DIST. AZIMUTH ~EET OEG/IO0 FEET FEET FEET DEG ~IN 9805°84 7954.55 7900.00 50 9 9958.90 B064.55 8000.00 48 16 10108.45 8164.56 8100.00 47 39 10255.61 ' 8264.56 8200.00 46 37 10399.86 8364.56 8300.00 ~5 55 10543.73 8464.56 8400.00 46 1 10687.89 B564.56 8500.00 46 25 10831.99 8664.56 8600.00 45 48 10975.34 8764.56 8700.00 46 10 11119.77 ~864.56 8800.00 45 40 N 19 36 W 4685.82 N 18 18 W 4501.57 N 17 31 W 4712.55 N 17 24 W &820.25 N 16 55 W 4923.91 N 15 49 W 5026.~3 N 13 46 W 5130.07 N 11 1 W 5232.50 N 8 29 W 5333.01 N 7 5~ W 5434.48 0.70 1.23 0.04 0.91 O.2Z 1.33 6.96 1.57 1.25 1.05 6108.29 N 1810.00 W 4489.34 N 23 ~7 W 4217.86 N 1847.67 W 4604.80 N 23 39 W ,4323.7Z N I881.T2 W 4715.44 N 23 31 W 4426.65 N 1914.2~:l W 4822.83 N 23 23 W ~.525.98 N 1944.96 W 4926.20 N 23 15 W ~) 4625.19 N 1974.18 W 5028.90 N 23 7 W 4725.55 N 2000.85 W 51'31.69 N 22 57 W 6826.85 N 2023.15 W 52]).71 N 22 46 W 4928.12 N 2040.32 W 5333.79 N 22 29 W 5031.22 N 2055.46 W 5434.90 N 22 13 W 11261.69 8964.56 8900.00 45 10 11404.16 9064.56 9000.00 45 39 11547.66 9164.56 9100.00 66 6 11634.00 92~4.43 9159.~7 46 N T 52 W 5532.32 N 7 49 W 5630.93 N 8 21 W 5731.02 N 8 21 W 5791.60 0.17 0.51 0.00 0.00 5130.93 N 2069.18 W 5532.49 N 21 58 W 5231.51 N 2083.06 W 5630.97 N Z1 4.3 W 5333.38 N 2097.53 W 5731.02 N Z1 28 W 5394.94 N 2106.55 W 5791.63 N 21 ZO W SCHLUMBERGER O I REC T I ONAL SURV E Y COMPANY BP EXPLORAT I ON WELL S-23 142-27- 12- 12) F I ELD PRUOHOE BAY COUNTRY USR RUN ONE DATE LOOOEO 1S - OCT - 90 REFERENCE 74157 ,LL' S-23 (42-27-12-12) ~--- ~1631' SNL, 943' E~.;L, SEC 3:,, ,'12N, RlZE) HORIZONTAL PROJECTION NORTH 7000 6000 4OOO 3OOO ~000 10o0 ~UTH - ! 1200 WEST REF 74!~? SCALE = !/lO00 IN/FT --*-.-:-r--~--:--.-?t-+--b.-r?-,---?-,-?.-+-...-.H..4.4-¢4:'-4.-.~-.~ ....... .L.L~..~.--f,.----:.-+--H?'. t'--H* ....... .:-..H..4 ....... .5-..:'.-HH--4--b¢.H-.~.4-.L!.b,L~...L~ ...i--;.-,b~;, ..... 1....;.--4-..* ...... *--*...4-4 ....... -~,..,;-..4...4 ....... ,'-.-:...i,..; ......I ;---;.-4...; ....... -.:...L.-;--.; ...... *.'"";"'i'"+ ....... *"+'-H-*.' ...... +"'i"'H'3 ....... ~"'{."+'"-? ...... ,*'.'i"";'"+ ........ i"-i'"H"?'"H'?'"'(" f'-? ...... *,'-~".* t' "f 3"'3"'~'.' 4.-4..4.-4 ....... b.~.4-4..--4.4-i--.b-.4.--4...*-.; ....... 4...;...;-i ...... L:...i...: ....... i...;~...;..1...4...I...4...4..~...:...;...;...4...t...4...;...;...4 ....... ;..4...;.-;...t...;...;...;...: ....... ;...:..+..;...4 .............................. , ....... l..., ...... ~ ....... .... : . · , , . , , ~ : : : : ! : ; : : : : : : ! : I : : : : : : ! : : : ; : : : : : , : I : : . . : ....... ,-,3.4.-*...4 .... 4---~--p-i--. ,-.*--.4--.-,..--4 ....... 4.-.-.: -.-4-..i--., --.4...4---4,-4..-+...4...4 ...... ' ....... '-.' ..4...4--~t -.4---4.-4--4 ...... 4.--4..-4.--4.-.,...4..-4-.4...' ...... ;.... '... '... '...4...4.,.4... '...4 ....... 4...4...*.,.-,-...~...4...4......; ...... ;...4...4... !...1..}..; ... :- :... ' ' : ~ ' ' ' : : : : I ........ · : : t :* t T ...... ~ , , · .... ? ~ ..* t t : : t ..... -.,-+4...~. ....... ,...,.-.~-~.- .-..,..4..-~ .......... +--H*'--* ....... *'-'*--~---*--'H*..-*.--~.~ ....... ,...+.4..*.4-*..-*--*...*.--4 ...i.--;--.$-*-4--.i..-*-.*-.., ....... ;-..;...i..-*-..l.-.*..-*..-;-..* ...... ;...~...;...,...f...;...+-;..4 ..... ;-4...,...,-.,...;...H.;-.,... +e-*~'-- ..... ~'~. ' .~ff"t~ ! : : : ,--4--4-.~.--+--.[ ! : : ,-.-~,---4-.4--.*---,; T ! ! -.4-..i---;.--}; ~ .......... .... ~---4-4---4 ....... ~-4-.4--4..4..'~-.-~..-.4.-4.-~ ....... --*~-i~--*.--* ..... 4 H*--~"-.-; ........ .... *..-;~4--.i ..... ~ ¢..4...¢.-i-- ............ -.*...;-.-;..4 ...... _.,,.., .......................................................................... Z...,...,...,..., ....... ...... , ....... .................. ....._.. ................. , .................. ....... ;~ ..................... ~ !: .... "?"*"'*"~"["'+"';"'*"'~ ..... -~-~*--~-+'+"-* ....... , ........... ~ .......... * ....... *'-*--*-'H'--'-.-~..-~-.* ..... ,-.;.--*-++-+..*-+*.-~--*--,-.*--,.-4..-;-..,.., ........... ,...,-.., ....... } ..... ~ .............. ~..*..,-.H..., ............ M..4.A.4...L..,..,.,~4 ....... ¢...,...;.-; ...... L..L.;-.L....4...L.;.4...,.4...L..L.¢ ...... ;..;-.L.~..4.-*...;-.,...;...4...L..L..L..;...,...;...L..L.~ ...... ¢.4~.;-.L.~...L.;...;...; ...... ;...;...L.;...~...L.;,..L.~ ....... -~-H.-~-,'++~"*"'--+--,--*--'-++++--,---?*--,-'*-4'++--++'.-gl~*47'?-*--* ...... ??'+--?~'++--*-+'-',"'~.-'+ ....... H-.*--*-'+-+'-.."~"+'-'"'+ ....... ,"',"+'* ...... +"+"+ ....... I"+-"-'-+"" ~-L4-. [-4---4---}..-~---4.4--4-4-H*..4.-4--4---: .-4..4...i--$--4-.-;...:-..¢.[.-...,-4--+--¢--4--+-.¢.4..4-+ ...... ¢-+-H4.4.-+.4.-4.-4--, .-.}.-4..-b-L.+..b-+...+--f-.. "4'"f"+'-f'-"+"*"'f"~ ....... ~-:-F' ~'~"T'''t- '-~'. "T"t ..... t"t'~-'t": '"t'"t'"T"'t ...... ,'-,'",'"~ "'T"t'"T'T'- -~ ...... t"T" "T't ...... t'-l'"t"?"t"'t ....... t'''t~'t'''t .... t'"t"'l"'t ....... ?t"'?t ...... '"'H'+"~ ....... t-'+"'t"'t ....... *"'?'?'+'" ~ { ( -'l"'i ..... f'*"{'"t ....... ~ ...... f-~ ....... *'-t ....... i ...... f-+"t''4 .......... f'"H'i~"-'?"?"H'f''~ 'H'"?"t"~ ...... ~-'-~.~-f---.4...H+--T ...... i..-f...f...f.....~.-.~-4..4 ....... ;..-1...+.--+ ..... {..4---t.-.{ ....... ~"'t'"t"~ ...... ~"'t'"f'"i . i f I , - : : ~ i i : : : : : : . . : : .......... ' . - : : - t t : : . ~ ~ . . . , ~ ~ . . . ~ · ~ ....... , . . ~ . . . ~ . t T . ~ ~ . : . . . . . . ~ ..... -~..,1 ~ ~ s~4.-~-~ ~.~: ~ ...... 4"~'- ............ -~'"e'"* ...... *"'~"'*'"~" ~"~"'*'"*'"*"1:''~ ~'~'"* ........... "~'*'~' '~"~'"~"*t ....... *"~"'~"*:: .... *"'*'"*"*~ I : i .... ~"~:: ~ t* ....... ~'~'"*"'*"': · t : ..~...~...,..~. .... ....... ~ ...... ~ *..4 ...... ...... ,...,.-~.-*..- ..... ..... ....... ........... ..... ........... .......... ...... ......... ~4-.L.~.--&4...~..-L- ...i-.L..~-.&.....i..,;...i...L., ,.4...L..;...~ ....... L.i...i-.;...¥i-.¥-i-4 ..... &.i...L.i ...... i,..i-.;..L,,...~...;.&4 .... i...L..L,.~ ....... L..;-4.-~ ....... L..i.-:..4-.[...&.L..i..&.....4.,.:..4.,.i ...... i...L..;...; .... ' ; ; : ; ; : : : ; : ~ ~ : ; ; : : : : : · : , ~ : ~ , ~ : : ~ ; : · : . · , ; ; . : ; : ; , . , -~..~...~.~-~-4-~..~-'~; ........... ...f..~..-,...; ...,..~-..~-~.-. ~...$-~.4..4.-.~..-~..4...~-4....~' ................... ..~.--*..~-..~-. -+..$.~4 ...... ,..4...,-., ....... ~..4~...~ ..... ~...;..,..~.....~..%+.4......+--;..4..4... ,..4..~..4..~..-4-.~-.*.~ '~ ;]~..-;-..~ .... ~'f"'"++'~'~; ~ .... t"~-t-'?;; ~ ; ' ~ ~ ~ ~ ' ' ~ ~ '"'t"~"~?"k"?"???'+?'?t"?- ~ ~ ~ ; '-~"~ : ~?'?'" ' : ~ '~'"r"~"'~ ~ ~ ~ ....... ~'?~"t~ ~ ~ ~ ..... ~"~"~"'~ ~ ~ ~ ....... *"'~-'~"~""~:: ~ "~"'??r"; ~ ~ ~ '"??-~-~ ~ ~ ....... ~'--"~"~ ..... ...... r'-$'-~"-~--" ~ ' .L ~=~ ~. -.;.4...~.~.- ...;...~...;.-~ ...... ;-;..4..4... ,-4.-4...~-4 ....... ;-;...~-.~.., .~;.~..~, .... ~4-~..4 ....... ;-~...~.-.~ ....... ~...i..4.~ ...... ~..~..4..-; ....... ;.4.-~..~.-- ..4..4..4..4...-.~-.;..4..4 ....... ~"4'-.~"-; ....... ;'.'~-';"-~ .... ~-~,~.-.~.-4.-~ ...... ~-.~-~4--~.4- '.~...;.. L;.4_;.,.~ ...... ;4...;..~....~4..4..~... -~-.~...;...~ .... ~.44...~ ....... ~-.¢.44...L.4...~.L.~ ...... ;...~-~...~ ..... L.-L4,,.;..,..~-.L4..~ ...... ~.,,;-4,.~ ....... L..;..,;..~ .... ...~...H.., +~...~.-~.~-=+.+.--+*.+..~ ..H...~...~.-~..+4::~:~4-*+.--+,..4..,...-+.-~? ~-.H..+.+..-,-+..~..+ ..~-+++.-.,.+..~ ....... 4,..+...,.+...,4.4--+.. W.,-+-~.-.-H-+.+......H..+-~.~-.+-4...H.-L..H..4.-4...,...H..4-..~ ....... H..-~4~.--..+4..+..+ ....... H-.+.-~ ...... H..4...H..4..~'"H""-+'+4-¢'~--4-'-~4'-~ ...... H...H ...... ~...H.-.~... ~-+..e--+~¢-~--?-~.-~-.,--.~ ....... ,.-++--,---{-..~.--t-H ..... ~"~'-~ ~?'*'t"?'+t'?~"' ?.?-.,-t-. ~-'~"~+5" '"H-'~- "T'?t"t""?Hq ...... %..H...b+..~..~-+- ~-~'-?'-'~+--~-'-,'?-~-~--t~'--*--~ ...... ~--?t--t'--t-"*-?'~'"t'--t-'*-"~---~-" gr--k-t--t ....... t-m-?-:-'-f-?'r--?'?-r'+"'t"tm" 'm??'~'"' '~w'"t"* ....... '"1 , ~ ~ : ~ : : ~ .... I .... :'"r'T'~ ....... *"~ ...... ~-', --~.'-'-~-":-"?: ..... r? ."~'-?,"~ ......... ~ ........................ i ....... ~..,-.,..4 ....... ,...:...,.4 ....... '-4...,-,... m.-~*.m..- "~--*-~-'~'t"'*-*'"*"4 ......... 4.4~...{.-&.+.?.~... -+4.-~-4.,-.-~-~q--~ ..... H+-.4.-+~-.{-4 .... . L.-4---H~-, ....... . ..... +.~-.- ..4-4.-4 ........ ;iii .............. ' ................ -4-~-4.-- 4--~-~-.~-~...$-4.-~--.~ ........ ;.-~-.~.-$---,--4-4--4-~-- .-$.-,$-.4.--$-.~-4.-~4-~ ...... *---~..-$.-.~--.~--$-4-4-.....-,,-4-..~...~-.~ ...... ~...~.-~...~-, -.4~4..~..~... -~fH-'~ ............. ~ .......... 4-, .......... t ........ ~' ~'+~-'~ ....... F',~-'t'-.-?4 .... r" -~"'*'~"~'" "?'t"'t''4 ....... ?'*"~' '"f'~ ............ t~"'~-4''' -"~ ...... ?~'~--~-~---f-t ....... ?f-'?~ ...... t---~--*~'-~--t-Hr-~'-~'-?--?~-?~z*==-~-t'''?-'?-'~ ...... y--wr"? ...... r~-'T"~-~"~-t-'~ '-w'?'--?~ .... r-~-'?m-'--T~-'w?"- ~ .-~.4--~- ,-~.-.~.-4--4 ...... ~.-~-4---~.-- .-4-..*-~~..-i--..-.i.--i...~4.- .~4.--~--4-..*..~ ~14-4-*..~ -.~.:.~ ---~-~...*...* ....... ~-.;-~..~- -..~..-i.~..-~.- ;...*,.~--*-..i ....... m--*,.,~ ...... *,,4-.~ ...... *,-~--H*-.- '~"~' .... TT ,~'-'..4 ' · ,...~, t T :'--~ ..... ~T : T i ~ ; ~ ~: ~;' · '..4-',.-~ -.' '...~ ..- L ..... ~...~$ .... ~ ~'..4. · 4... ~.~, ~4 .~.. '..4 ..... .... ~...~..4-$ .... ~; . , J , ~' .4-~.4 ...... ~ ..... .......... ~,., m.~.4.,~....-., ..4-.....~..4 ...... .,...-...,..; .... ...... ~..t , :"'~"~- .... , .... ~ ........ J ............... . ; ~ ~ J ~ ~ ~ ~ ~ ~ ~ '.-'-'.--~.. -f.-~-f-.~ -++4-4 ...... H.-+--;---..-H.-++-'..H..-H--,+H...* ....... ??,?.~-,..~--.~..?~ ...... H-.H ....... ~..,~,.-$..~ ....... H...+.+..,..i..?.t..t ....... i-i"'Y'~"' -++-+'+---+~'-,-+++-r- --b-f+--?-+.+--~+-- ~-~-'~-~"'t'"~'"~-4..4...;...L....4-+4...: ....... ;..;-;.4 ........ ,..+.~ ..... ,...~.,.., .... · -.4..H-4 ...... H-H--.'--~-~---t-,--~--5-~-+-, ...... H.-.?-, ..... {.-~-'-?-~ ..... H'"f"~ ...... 'T'Ft'"~ ....... ~T'FP"?'?'T .... ~4..~- ~'T ~ '~"'t"~-'r"~" "T"t-~'"t"~"~'~'"t"'t"' r"r"t'"~'t ..... r"t"~-t"- , ~ .... -4-4...L~ ......... ~-4-4-+....~.~..~.~ ....... ,.4...,..., ...... ,.4..+..~....~...~..4-.,--~4..~..-4-4 .... H¢4-4...~..4-.4~-H ~...~..??-.~ .......................... ~ ~ ~ ~ ~4-{ .... ~.&bb-4..4-~.4..[4-~.¢~-.-+.~Sd.-~-fd-~ ~-~f-i-"-%4"+"~"~'?:f":~Z:i2~: -T..,-.~?. .... f.?..~?_ _~..?~.~.. _~ ......... ? ...... ? ....~.~.4-..~. ..~..4..~...}-.~.1.]...~-4...~ ...... ~-.i...~--~ ...... ],.,]...~4 ....... ~.,4-.~...~.--[.--],.-~...~...] .... ' ; : ; ; : : , ~ I : : ~ : : , ; il' : , ' ' ; : : ' ; : : : : :, '-,-?,'?-: ~---,-T-~--~-'--~-r-~--~-~-'?~-~"-?~-?~ v[.-~.--?-4."}-'.~-+'+"+ ...... +..+.+-+....%+..~-.* ...... +...~-+--+ ...... H+'+..t .... .... .%~.~4_~ : : ~4_=¢4 ] ....................... ' ~ '': ~::: --4--,{.-bb~-b4-.-H .... ~"'~"'~'"~"'~"'~'"~"'~ ~" ~-'~"'}'"+"'~"'~'"+ ...... ~"'+"'+"'~"'["'t"""'~"'+ ...... ~l"t"'+"'~"'}"+"'?'~'"+'" ~' ~ ~ '"t'~"~-' i. ...... .......... ........... · .~.1...~..;-¢...i ....... ~...~...;,.4 ....... :...~,..;.&... '''il'';''';''~''~''';'''~'l';'''~'-- ......... t"~-t--?t"t'"?".'"??f"t-'"5'f'~-J ....... rT"rT- : ........ ~_l,. ,: ~: .,~ ~ -~- -~...t..+-~.-.t-i.-?? ...... +'+'",'", .... +'+'?~ ....... +'+'?'+" ~..._~3] -~.H '~]TT'I]~]' ' ' Ei~;;~': "~!"l'~ .... ]~~:~T" ~-.+.-~--4 ..... ~.4...L.i-.: ~ ~ : .4...~.4...: :~ .... .q.]]]]i]]] ...b4..4..4 ...... ,---, .............. ;.-H...~ ...... H.-.;...~ ....... H..+.+.. . ~ ~.: .... yyy.yl ~_~: ~ ..... f"t-?'?" .-*-4-*...~.. ..~q..f.( ....... ...., ' ............... ~...~-.f.~- ..-~-.:4-4.-.-4-4...~.4 ..... ..... z ..: .... -.?..,...,--., ....... ...... * ...... t"t"'t"'?t'"t"'t"t"'?'":.t"'?t ....... , , ~ ..... T"T'T'T" , ~, ~ . . . . -4000 -DO00 -2000 - 1000 0 1000 2000 3000 EI:~T ELL' S-23 (42-27-12-12) ~ (1631' Slib,,9¢3' E~.IL, SEC 3b. F12M, R12E) VERTICAL PROJECTIOI'I - ! 000 0 0 ! 000 2000 9000 158. r j i ~ ! I ~ ~ ~ ~ ~ ~ ~ ! .... ; .... ~-"'?' ....... ~'"'-'""~ euuu bUUU 6000 '/000 ..... ,; ........ ...... ....... ....... ...... ....... ....... ....... ::: i' '...~...~.]~]]~]],. ~ , ][]~]~]~]]~]]~ ~ []]~:~]:~ ~"t ...... F'?'T"t ...... T'T'T"r"*~?"?'i +'+" +; ~ ~~ ~ ~ ' ' ; .... ...... ~...~...~...~...'...~...~...~...~ ~.. ~..~...~ · ?.....-?..?? ..... ...... Z:i ....... .... -.~.-;..~-~ ...... ;...:..;--~......;..;~...~ ....... ~.-4...' : ]...',:: ~;~ : ~ .... ~'"~"'~'"? ...... ?'?"'?--~ ....... ~.-+-+..;..-t..;-.-;--.;...; ....... ; ....... ; ....... ,...~...;...;; z...L ~ ~;: ~ -H...~...¢4...~..4..4 ....... ~...4..4..L~ ...... L.r:]X:::~]X:X,:::~"'r"t"rT?"t"¢"-~-":'"P~-"t-~'-t'--?++-.~ ..... H'--~"-~"'r'-~'--¢'-.;-; ....... ...... YT'TT!'T't"Y ...... TFW':"'Yri"? ...... ....... .- &..~-¢.¢. 444.+...44..4...~-L4...;..~X ~ ~. ~...~J 5][T'r'""?'?r-FT'?'T"t"~'" '"~'--f--~--i ....... f-+-+..; ...... ¥4-+.4 ....... 4-..~..4...¢ ...... ~...;...;...~...~...L.~_.;...;.. ~.~...~..~ ~ i~4..4.-4 ...... I...~.-4...~....&-:...:...~. ~ } ~ ~ } ~ ~ ; ~ "~-?T-?'*'"~"~-T"T-"W"?'~-~ ....... ~"+"'+"~ ...... ,...L..~...¢ ...... ~..4..4...* ....... ~...~ ...... ~..4..-i-~..¢.} ' : ~ ~ : ; : ~' ~ ~ ~ - : ~ ~ :~ ~ ~ ~ ~ ~ '. ~ ~ ~ ~ ~ · ~ ~ ~ ~ ~ ~ ~ ~ .... ?"~"'??"7'~'"~"'~"'~ ...... :'"~'":"T"~ "'~'"~"'*'"?T"*'";"+''* ...... ~..+..¥4...~-.~,..~...~...~ .... -'--~---~..+-----4--~--~..~ ....... ? '"~"'~-"t'--~--~..-~---~-- ~,..;..~ ~ ~ ~ ~ j : ; : ~ ~ ~ ~ ~ ~ T"T ........ ~'"T"'?"? ....... ?"'?'"t"'? ...... t"'t"'?'t ...... t"'?"'+'"+ ....... *-.4,..*,..*...~,.*..~ ~,..t. ..~'....~ ....... I..¢..~..~-....4. : ~ ' ~ ~ j j ~ ~ ~ ~ ~ ~ i r'T'?"FF"T'T'~"T ...... r'~"'rT"t"'t"-t--i-'-t ....... t.-+-+-~-..'-.4.-+-+--~ ...... ;-.4..+..~-...'...;..~...;.-~ ...... ;..;..J...;..L..~:, ~ . , ~ ~ ~ ~ ~ j ~ ? ~ ~ t~..~...' t T i "t "t"'t"?'-~"?"t-+"+'-,--~-~-.--~--~.4.~.-~.~.' ...... ~..~ ~ ~ ~ ~ ~ : : ~ ~ ' : : : ~ : ~ ~ ~ : ; p~'-~-~-..-?-~-~ .... ~..-~...~-f--[..~.' .~.4..- ~ ; ;~_ ~_; ~;. ~, ~ ~ ~ T"? ....... ?'T'~ ...... ?'-t-?-t ..... ?...,-.~..~....4-+.~ ...... ,..~_.,..e ...... ~...;...~_~ ,--4.~..~..~..., .~. +..~-~ .~ ~-~..1.....~...j...~ ,...~ : ~ ~ : : ~ · ~ ~ ' : T "?'"T ...... t'"~"T'~ ..... ?~'"t"'~ ...... r"t'"t .............. T,.-~...~ ...... + ~- ~-.~ ....... J..4.. ~ ~ . ~ I . I ~ ; ~ I ~ : ......... ~ ? '~'*T" ~'"?"~"~ .... ~"~-'~'-~-...~.--'. ' ..... : ' : : . ; ~ ~ ~ : J : ~ ~ · · : ' ... ~.. ~ : ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ : : :'"T"''7-T"?'"?-'~"~"~-C"t"-"+-+.~ ....... ~ .... ~..~ ..... L..~.-'.: ...... '..~-.'. ~ ~ : ' ~ ~ t 2 ~ , · ~ ~ % T'7'"t ...... ?"?~"'~ ..... ~"~'"?"' '"?'"?'"?~ ....... . "'?T'"t"+'+'+"+ ...... ~"-+"-+'--*-'-~-.4---~--+---~--,.-~.~ ~ i _: ~ ~ ~ , ~ ~ [ ~ ~ ~ ~ ? ? ~ T"'"t-'PT"[ ....... ?"T"?'? ...... ?'~'~-?"- ]~ ;~ ~'~ '-'~"'[~ J~J~l ~T'T-FT ..... T"T'T'T ....... Y'T'"T~ ...... F'r"T-T'P'?'T-'t ....... ?'t-'t'"r't'"t"'T'f .... -,"~: ~:~ ~ ~ ~ ~ ~ ~"+'+'~: +-+'+--~-~---~.*.-~--:..~-~...~--~-~-.b.LJ~J- ~4 ~ ~ ~ ~: ~ ~ ' 12 ' ' ~ ~ -'~"~"¢- -'~'-~". ~--~-. --~-~ ~-~ ~ w....~...-.. · ..... ~........... ~. ~ ~_ . . . ~ ............ ~ ~ ....... ~ ..... t ..... ~ ............ . . . ~--r.. * · · ~ ~ i ; - ' ' : : : ~ : ~ ' : : ~ ~ · T T ? % ...... ?"'?'?'"~" '"?~"'?'t ....... ?*..?..~ -~ ~ ~ ~ f + ~ .~ .... ~ ~ 4 ; ~ i ; ~ ~ ~ ; ~ ~?"F'F"~'FT'[-'"~'."TTT'T ....... T'"FT'T'?T"r"r'~'"~i~-.-.~m...--f.4--+.+.....4..+..~...; ....... ~...J~~;~a m~'~. ~ ....... ; ~ j ~ j ~ ~ ' .+++-F--~.$+-~.~..~;~..~.;.~.,...'.~..:..~..L; ~.~ ~. ]'TT'r't'~f'~'-r"r-t'-¢--t ..... t-.f.+.~ ....... f.+.+.4 ....... ¥+.+.4 ...... ¥4..4..4 ...... ~...;..~...~ ....... z...L~...L.. , ~ ~ ~ ~ ~ ,t r '-r-r-,"-r-'r-?~- ~--??-, ...... ?.+..~.~...-~ ........ , ...... ; ~_~_,._ , , ~j jl , ~ ~ , . ~ , t: ,'"t -*'~" -~-' ' ~ ~ ~ ~ ~ · ' .... i ' * . ~ * "*~ .............. *-*--..-~.-.*-* ........ ~ - 1-~ ~ , ..... "'~ i ~ ; ~'~ ~; · ~:~:.~f~::~---~.-~ ....... ~-~4.-~4-~ : ~ ..... ~ I ~ ~ ~ ~ ~ ~i · i ~ ~ ~ ~ ~ ~ f ~ ~ ~ ; ', ~ ~ ~ ~ .-~.~4~. ~...~.~ , : ~ : ~ ~ ~ ~ ~ j ~ T T '%'" "T'T":-%" '%"~ ...... ??~-'?-"-t . 4--t ......... ,-..'-~ ...... ~..~...~...~ ...... ~-.-,...*-'..-..~ .~...~ .. ~ '-; : i : ' , ' ' ' ? .... ?"?'~'? .... ?"'?"?'* ........ ~'" "~"'*'" "~ ~"~"'~ ~ ~-' ..... : ' ' ' ~ ! ' ? -'?"~ ...... t'"?'t .... · .;,,_....,...,~, ,~, ~,~, ~ ~ ~ .... r'r": ...... ??'~ ....... ?-~-.,..?...~i:~~,__4_~...,.~ ...... . ....... ...~.~ ..:... , ,~,, ~ , *l ~ t '"t ...... ?'r'TT' "r'?"~'"t ........ t---t'-'~.-.t ...... ?f'+"f" "~'"*-'-~--~---'-.~---~-~:---.;-~-..~--;-L..J...J.-.L.~. ~ ~ ~ ; : · ~ ~ ~ ~ [ T ~ ~ T '"t-7"':"'t"y"t'"?'t'"~ .... ..... ~--~ ..... ' ' ' .~.~...' '. -' ~_;_~ ~ ~ , , ~ ~ : : T , , t '"'~'? .......... t-'~-'?"~ ....... r"?"~ ......... ?'t'"?'t ...... +.-.~.-.*-..* ....... ~...*...*...'.-. ' ~ ~ ~ ~ ~ :~ ~ : ~ , ~ , : · ~ , ~ f ' :: ~ ' ~ ' ; ~ ~ ~ '/' · : ~ ~ : ~.~ , ~;~' ' ~ ~~~ '"T ............ -~ :f:~ f ~ ~: ~ 'f~ -f i:.+-+.+~ f +-+.~.-~..4--.;...J...~..4..4~.J...; ~ ~ ~ ~ ..'..L ~ ~ ~ ~ ~ ~_ f f ~ ~ ~~ ~ ~ ~ ~ · i : t ~ ' ~ : ~ : ~ : ~ ~ :': : · : ~ ?? ~ ~ ? ~'"? ..... ~'-~'~"~-' - ~-~--~--+-.- --~.-*---~..~... ~ ... '. ' ' ' ' ' ; : : ' : : . ~ ~ ~ : ~ ; ~--~.~ ~ ~-~ ~. ~ ~~ ~ ~ ~ . ~, : : . . . ~ ..?. -?.?.?..? ....... ,...?...,...~ ....... ,..~..,...~ ..... ,...,..~..~.. , ~, t~ ~., , ~. .~' .: . .... ~ ~ . ~ ..... , "r'~r'-'-???~-. ~"~'? "~, ....... '-~-'t ..... ~ ~-', ~' ~-.~ ~- ~. ...... ~-~-~ .-,' - ?' ~-.,..., ....... ~.~ ~-,. '- '~ ...... T~r. -~?i ..... ?.~--?~.- .?.T-?+-.-+++-+.-.-+.4-~..~...~-.4-H..+...~ ~4..~ . ~ ~ ~ ~ r ~-['~-' ,'-~"-r'-? ~- [I'~ ....... t-~.-r.....~.. l~ i ' ~eJ~ ~ ~ ~ ; ~ ~ } ~ ~ ~ ' f ; ~ ~ ','T"t": ........ W-'r"T"'"="'T-T-T~C' ~ ...... ~ x ~ . . ~ . ~ . ~ . . ~ . ~ , , . . . ~ .... "~-~--t ~-- ~--$- ' - ~ ' ~- ~. ' · ~ ~ : ~ ~ : J ~ : ~ : ~ : : . t ~ ...... ~"'?-'t-w .... T ..... *...* ..... *...*.--*---~ ....... t.--, -.-~ ~ ~.~ . ' $ ..... -;.;--~4-~ ~$~[- -~ T.; T] "Z[t]~t][~::']"T'T'TT-"I'"t"T'T''~''T'T''~''T'- -i-'i'-+'(-,-.~-~.-.f-?-~.-+-+..?~ ...... ~-+..~.a....4..~...~...~ ...... L.J...L.J ....... ~].]. J ....... J..; L ~ ..... [ ~ L I --~.~.~.-.~.~-. ~~_~...~..: ..... ~ ~ ~ ~ T : T ~ : t ?-y-~--%~.t.-~ ...... ~'"~'-~-~-'-*'"?+...t ....... +--*---t--.~ ...... t..+..*...1 ...... ¥.;..i.-.~.. ~ ~ ~-~ : ~ ~ · ~ ~ .... ~ i ! ~ f i ' ' ~ i ~ : ' : : ~ ~ : : ~ : ~ ~ : : ~ : ' : ' '.: ' ~ ? '? :"? ....... ~'"""'?"~ ...... *"'"'?"'? ....... *"'*'"*'"~'" · .~,,i ~ ~ f..`..~...?..~:.~.~.+..L.L...`~...L.L~...~...L.j...?...L.~...<..L.i."...~...L.L.i ~ j ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ j ~ ~ ~ ~ ~ ~ ~-~.+--~.!.~...-~...~.~4-..~..4_~... ~_~.~J I.~ I...;.j , z~ ?'T' "T'] ...... rTT"r"'TT"r"t ...... ?~'"~'"t ....... *--r'+"~ ....... ~.'.t"-?..t.-.~-.+..?+-.~ ....... ~..~.-~...~ ....... ~ I ' ' ' · ~: ~ : : : ~ : ~ ~ : ~ - '-~"'?"~'"? ..... ?"?~"~-' "~-~- '-'~'*~.--t .... + ~. ~..4 ........ ~.-~...~ ....... ~... ~ ....... ~ -~.-...-~.-.~-4-'---.~+.--~-~ -~ ~-~ ~ ........... ~ ~ ~"'~-'f ...... f"~"+"~ ....... ~"+'+"t ...... r'.?~...f .... -¢.~-.f..~-4~..~.....~..4..~:Z~;XZ]]ZTi"TT~-r'IT'r-r'T":"Z"?P't- -¢-~-?--~--~.ff.-4 ..... f+4...+ ..... ~..4.4-4....-+.4...~..4 ...... ;..f..4...f .... t...;J...; ..... ;..;..f...~ ....... L..L.L.f...: · -t'?~ -~-i~'~" '-~ +-+.~ ....... ~-~-+.+-..--~. ~.~.~ ...... ,- . -,~ ~ ~__~ , , ~ T. T : T ~..*.. r : . .. · ~ % ~ T ~ : : ~ ? t ...... ?..,.--~ ......... . ~ ....... i' ~' ~ ~ ~ ~-~"" "~ ........ ~--~"'~- "~ ~-~-~ ~ ~ ~-~ :- ' : ~ ~ ' ~ ~ ~ :-- ' ' ' ' ~ ~ ~ ....... ?"~"'~"'~ ....... ?'~"""" ....... +"'+"~'"+'" , · : ~ ' · : ' ' ~ ~ ...... ~'~-~~-~ .... ~-+--' ..-+.-'-'-' 4 + : i ~ : ~ ..... ~ ~ ' ; ~- . . ~ .. '.' ._ · · . : : · · ~ . .~ · ~ t ~ '?-"-~ ..... ~ ........... * .......... *...~...,..., ....... ~....~...,...~ ~ ~-~ ~ '~'~"~-"-~"~--.-~+~-~-..+~-~.- .-4..+~+..~+.~.-~ L~..~..~ .... i-L..L;., ~ ~ ~ 1% ~ ..... ?FT"?"I"'T'T'T"~ ......r'T'T"r"','"r'T"r"~ .... -'~ ..... * ........ ~-W-~..4--~ -4..~.~--~ ~.~ ..... '.~ ~ ~~ ~ ~ : ! : i : : : . t t"'t ...... t'"~"'t'"t"'/-"t...?..?..t ....... t"'t ....... * ...... ~.~ ....... * .... -~-. . 14 · - ~._ ~..+...~.....~., ~ , : ~ ~ , , ~ . ~ : , T ..... T f T"'t"'l"'*"T"~"'t ...... T"'~"'t'"t ........... r"t'"t .......................... ~..~...~ ....... ' F ~ r~-~ ? ~ ~-~-~e ..... e4.-~?....-~+..~-~ ,~...~..+.. ~..~, , 4-'-' ' ~ , ~ , ~ ~ , ] ~ i ~ ~ r"~ ...... r'r"?'r"~-'T"r'-r-.r.. -~. --~, '---~T ~$. ~-, ~-' "-~'~' ~""'~'------"~~-~::, , , '~'. , - ::~'~'~ f?~ ~ p: ~ TM -i, ~, "~4' "~ "~ ~' -~-~'~'4"~' .... -.~.-~-..~.--~?..,.,... -~..~..~._."~'~"~' ...... ~ .,_~-4'"~'"~..., .. ...... ..... ,~'"~"'L'~.,;, ........ ,_;"~',...,...~_.~' ~-..~...~...i,. . . ~. i, ~.~ ~..,~ ,...,~ ,' ~ ..... ~-~q"~ ........ ~--~-.-...-~.~-~-~ 4-~-+~-~ .. ~ ~ ~ ~ ....... ~ . t ~ t"'t ........... ~"'~--~ .... : · ' T: : : · ' ' 1'' ~ ~ ".' ~'~' ~'~ ~'~ ...... *'"t"'*'-*- ..~....--~..4- ~ ' ~ ...... : ~ ' .... ' ...... ~ ~ ~ ~ ~ ~ ~ ~ ~ ' ~ i ~ ~ i : · . ~ ~' T"t"'t-'~ ....... t"'?t"'t ....... ¥'¥': .......... ~"'¥+.'~ .... : _ t i . ~ I ~ · t , ~ ..... ~ t"'t~"'t ...... ~t'-t-'~"-"~'"*"'~' ",-* ~--* ...... l-t ~ ¢ ..... +-* i i .... ' ....... - ', , ,, .......... ...... ....... 998. PROUECTION ON VERTICAL PLANE 998. - ]58. (~Ci:II. ED IN VEI~TICAL OEPT~ HORIZ SCALE = I/1000 IN/FT BP EXPLORATION PAD S (42-27-12-12) $ 25 /¢o ~ IZ ? ? ORIGINAL Controlled Drilling Consultants, Inc. LES HENDERSON (907) 333-1552 CONi'ROLLED DRILLING CONSULTANTS, INC. P.O. Box 190560 Anchorage, Alaska 99519-0560 (907) 333-1552 October 7,1990 Mr. Brian Rose BP Exploration Pouch 196612 Anchorage, Ak. 99519-6612 RE: Magnetic Single Shot Survey Job No.A-0990-023 Well:S-23 (42-27-12-12) Prudhoe Bay Field North Slope, Alaska Date of Survey: 9-23-90 to 10-7-90 Dear Mr. Rose- Please find enclosed the "Original" and Four (~.4+ copies of our Magnetic Single Shot Survey on the above well. The method used in calculating this survey was Radius of Curvature. The depth of the survey was 474' to 10,872'. Thank you for giving us this opportunity to be of service. Yours very truly, Controlled Drilling Consultants, Inc. D±rectional Superv±sor HORIZONTAL VIEW B.P. EXPLORATION WELL S-25 (42-27-12-12) RADIUS OF CURVATURE MAGNETIC SINGLE SHOT SCALE: I' · 1,000' TVD = 8,670' TMD = 10,872' ~,~,00 $0o° .~,oO 6GO0 G~,O0 $0O0 ~ 560° &sOC ALL DEPTHS SHOWN ARE TVD ~0O' ~0O0 BP EXPLORATION MAGNETIC SINGLE SHO'f SURVEY RADIUS OF CURVATURE METHOD OF CO~PUTA'I'tOH ENGINEER C.W, HARRINGTON COMPUTED FOR CDC BY ARTIC SLOPE CONSULTING ;iR OUP JO8 NO A-0990-023 WELL ' "'~ KB ELEY ~.5~ FT, SURVEY DATE 24/09/9fl PROPOSE~ DiR N~9-20B RECORD OF SURVEY TRUE NEAS. DRIFT VERTICAL SUB DRIFT DEPTH ANGLE DEPTH SEA DIREC D H DEG, TOTAL COORDINATES C L 0 S U R E S DISTANCE ANGLE .F.:, 0 (; LE~S SEVER I T Y D E G,.." t OOFT ASSUMED VERTICAL TO 0 0 0 ,00 -'64,56 i.,t 4.74 0 45 47~,99 409,43 987 0 15 986.97 922,4I N 1495 0 ~5 I494~96 14~0,40 S65 2005 0 ~0 20~4,95 i940,~9 884 25 04 0 ~5 25 03,94 24,39,38 N65 2748 0 42 2747,93 2683,37 881 2841 2 ~2 2840,90 2776,34 N48 2934 4 24 293~,74 2869,!8 3039 6 30 ~038,26 2973,70 32~0 I0 54 3227,07 3162,5t 3324 12 48 3319,06 3254,50 NJ0 3419 t5 48 34II,t0 3346,54 N22 3513 18 42 ~500,8'? 3436,3~ N22 36 87 2 i i 2 3589,22 3524 , 6~ N22 3700 23 I8 3675,29 36t 0,73 N22 3796 25 54 3762,57 3698,0~ N23 3890 28 48 3846,05 3781,4.9 N25 3985 31 42 3928,1i 3863,55 N24 4080 34 42 4007,59 ~943,0g N25 ,00 2,53 1,60 2,49 ,28 i,06 i,TO 5,50 I3,, 12 22,.85 35,75 52,i4 73,17 98,94 128,63 16'1,20 '~97,9i 2.'37, t 6 280' ,, 47 :;27,6 'l ,00 W ,70 E S,62 E i, 97 'E i,24 W I,.85 2 26 W 4 44 Y 821 W 14 64 W 22 5,1. W 32 O0 52 55 75 29 88 68 i 04 45 ~22,46 ~42,80 'i 64., 78 4, 2 2 'I 2 4 9 i9 47 90 I17 i49 ':' 2 'g ~66 · S 14 366 85 N 30 29 29 98 N 28 49 0 79 N 27 49 2:'7 9I N 27 iS 79 7~ N 26 58 57 72 N 26 ,4.2 5 SIHGLE SHOT 'SURVEY C O. f,'i. P O T E R - i I 0 C T ::~_. ,,'"' .;:~", .° . ..:, ELEV c.,q.,56 Fi, RECORO OF SURVEY !"lEA9, DEPTH TRUE bR1FT VERTICAL ANGLE ~EPTN D H 4174 37 24 4269 40 18 4365 42 O 4460 44 48 4554 46 48 4838 47 30 5246 50 42 5403 51 42 5780 48 30 6066 47 24 6254 46 6 6536 46 24 6@I7 46 24 7196 4,~ 54 7479 46 48 7763 46 6 8046 45 12 8426 44 6 87~2 43 36 8997 44 I8 9123 45 24 940'9 47 54 9599 49 30 9787 50 30 9977 48 36 ~0262 47 O 105~4 46 6 ~0707 ,46 ~2 4083,58 4157 56 4229 84 4298 86 4364 39 4557 53 49 04 99 4922 t 7 5163 96 5355 52 5484 33 5679 33 5'873 I2 6326 83 6522 50 6720 6990 66 7402 09 749i 4.2 7687 7~ 7813 13 7933 97 8057 23 8248,67 8421,97 8552,90 SUB SEA 4019, 02 4093, O0 4165,28 4234,30 4299 4492,97 4740,43 4857,6 5099,48 529 0,96 54~9,77 5614,77 580,'3,56 6068,72 6252,27 6457,94 6926, t O 7132, 7337,53 7426, 7623, i7 7869., 4 7992,67 8357 9488,74 DRIFT DiREC DEG. TOTAL C. OORDIHaTES 377 94 432 40 489 97 549 46 611 04 801 84 ! 065 66 ~201,39 ~471.37 1669.16 !796,39 !985,46 2~73,67 2427,26 2616,24 2804,, 64 2989,58 32:33,26 34 i 5,3 O 3598,88 368 t, 95 3 q 77 23 4 0'~ 2,, 15 4148,56 4286, 06 4488,38 4664~ 79 4.797,29 !87,72 2i I ,9I 237,9 264,76 292, 375 47 485 02 538 08 641 7t 719 03 769 66 845 47 922 85 1 03 O, 76 t I 1~ ,9t 1278,96 1466 154 O I571 'i 643 1 689,64 ! 735,82 ~780,49 !840;81 't 889,23 ,~921,17 C L 0 S U R E S DISTANCE ANGLE D LEG c,E;,,,:ER ~ i'f OOFT 422 00 544 67 6 09 92 677 28 885 39 1i70,84 1316,39 1605,22 18t7,44 2 ~ 57,98 2361 ,46 26~7,05 2843,50 7049 325~ ,~7 3518 68 ,]:716 3914 54 4003 42i I 4497 87 464 '~ ~ 7 485t 20 5032 84 5167 67 924 055 955 I 3,4 ,582 ,849 ,407 ,,5 ;278 3:73 38I 888 9 06 .,592 ,472 ,531 S F L': T :[ 0 H BP WELL S-23 SINGLE SHOT SURVEY JOB NO A'-09".-)0--023 COi'!PUTER- ? ! OL':.T !!O KB EL. EV d',4.; ~'6 RECORD 0~- SURVEY TRUE HEAS. DRIFT VERTICAL SUB DRIFT DEPTH ANGLE DEPTH SEA DIREC D H DEG, TOTAL COORDINATES C L 0 STANCE R E S A i',I P LEG SEVER~T'," DEG/tOOFT :L:.'; E: S T :}: 0 H THE FOLLOWING IS EXTRAPOLATED TO TD 0872 45 54 8670,19 8605,6.'.~ N 9.OOW BOTTOM HOLE CLOSURE 5287,t~ FEET AT N 4916,81 N 194..-4,~b'~" W 21 .~4 t6 W I,; 21 ~6 W BP WELL '-'" :>" ,,,,r- ~-,..-, SINGLE SHAT '" ,._ . . . ,.-,UR Y dOB HEA.:~,.,RED DEPTH ANC, OTHER DATA FOR EVERY EVEN tn0 FEET OF ':'LIB E;EA CONPUTER- i'~ OCT i<'E: ELE',,,~ E..4,56 TRUE HEAgURED VERTICAL SUB HD-TVD YERTIC~L DEPTH DEPTH SE~ DZFFERE~CE CORRECTZON TOT:~L. COORD i NAT~'-'. 8 0, -65 i ¢5 165 . 1 O 0 265 265, 200 365 ..'365, ~08 465 465 , 400 565 565, 500 665 665 . ~00 765 765 , 700 865 865. 800 965 965 , 900 I 065 i 065, ~ 080 1165 i 165, I; O0 1265 ~ 265., ~ 2bO ~ 365 1~65, ~ ~00 } 465 I465 , i 4OO 1565 1565, iSOO i665 ~665. 16OO 1765 i 765, 1700 I865 t865, 18OO '1965 I 965, 1900 2065 2065, 2000 2i65 2165, 2~ O0 2265 2265 , 2200 2~65 2~65, 2:~00 2465 2465, 2400 2565 2565, 2500 2665 2665, 2&OO 2765 2765, 2700 2865 2e65, 2800 2965 2965 , 2900 3066 ~065, 3000 3167 3165, 3100 :~268 3265, 3200 3371 3365, ~3OO 3475 ~465 ,, 34 O O ,OO ,20 ,05 1,I4 2,86 4,12 4,98 5,23 4.,86 .r.~ 21 i , 60 i, 49 i i 92 2 il 2 46 ,74 I , 04 7,4.~ 15,5.5 61 .80 8?. 96 'i , 4 4 ,02 9 O 212 ,5 .,.. :3 '29 2 09 i 67 90 2 40 2 69 2 2 09 2 50 16,62 ,47, ;36 BP HEASURED S,-2~ DEP TH ~.N D ¢'INGLE SHOT '-' ~ ~.-,LRVEY JOB N.O A-ogqo-o':'3 OTHER £:,AT~ FOR EVER:'~ .... ,~*'" e.'.~x 100 FEET OF SUB SEA DEPTH, C 0 i'i P ill T E R- i 'i 0 C T KB E!_EV 64,56 FT, HEASURED DEPTH TRUE VERTICAL '~;-' - oU~ HD-T'¢D VERTIL:AL DEPTH SEA DIFFERENCE CORRECTION TOT.qL COORDIHATES 7581 3688 3798 3911 4028 4150 4278 4412 4554 4848 4999 547J 5628 5781 6079 6225 6~70 6660 6805 6950 7242 7~88 75S4 7679 7824 7967 8J09 8250 3565. 3500 !6 3665, 3600 23 7 3765, 3780 33 JO 3865, 3800 46 3965, 3900 63 i? 4065, 4000 85 22 4i65, 4100 113 28 4265, 4260 ~47 34 4365, 4300 J89 42 4465, 4400 236 47 4565, 4500 283 47 4665, 4600 333 50 4765, 4700 387 54 4865, 4808 445 58 4965, 4900 506 6t 5065, 5000 563 57 5165, 5t00 616 53 5265, 5200 666 50 5365, 5300 714 48 5465, 5400 760 46 5565, 5500 805 ,,5 5665, 5600 850 45 5765, 5700 895 45 5865, 5800 940 45 5965, 5900 985 45 6065, 6000 I030 45 6t65. 6~00 i077 47 6265, 6200 J123 46 6365, 6300 i169 46 6465, 6400 1214 45 6565, 6500 1258 44 66.65, 6600 1302 44 6765, 6700 1344 42 6865, 6808 J385 4t 6965, 6900 !425 40 ii9 t56 i98 246 30i 364 437 5 i 9 611 709 I 02 0 124i I'471 1576 !678 I777 I 87':' ~970 ~068 2t65 2262 2~59 2:457 9652 ~ 749 ~,.~. 44 ~ ..~ · ~,~:: 'i 0 ,93 ,96 ,47 ,45 °83 ,i5 21 34 88 94 28 98 ,24. .99 ,29 , ":24 :99 ,I2 ,37 ,44 ,59 N N N N N N N N N N N N N N N N N N N N N N N N I 04,85 126.$9 18 ! ,.':38 2i,~ 25! 14 422 466 558 0 O 60:3,43 6:, '41 , 9'5 682,38 722.66 762. O4. 800,6:3 839,68 879, 9t9,39 04,4,05 086.92 !30 i7;:2.71 .'2:55 , 7 ':' q 7 ,~. , :'3 :S 3 S, i377,98 BP WELL HEASURED :,-23 SINGLE SHOT SURVEY DEPTH AND OTHER ()ATA FOR EVERY EVEN '100 FEET OF SUB :~Efl DEPTH, COHPU?'ER- 'i'; OCT KB EL:~-,' ~:~ :: ...... 9 {i TRUE MEASURED VERTICAL SUB i'!D-TVD VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDIHATES 8529 7065, 7000 i 464 39 8806 7265, 7200 }54J ~9 8.945 7Z465, 7,308 }580 39 9085 7465, 7408 1620 40 9228 7565, 7500 ~ 663 43 9~75 7665, 7600 i789 46 9525 7765, 7700 ~ 760 5~ 9679 7865, 7808 ~ 8 i 3 53 98~5 7965. 7988 ~ 878 57 9988 8065, 8000 I 923 5g 0138 8~65, 8~ OO ~973 58 8285 8265, 8200 2020 47 04~ 8365, 8388 2866 46 0575 8465, 84 O0 2 ~ i 8 44 0720 8565, 8508 2t 55 45 0864 8665, 8600 2i 99 44 0872 8670, 8606 220J 2 3475 .:4564 3655 3752 ~958 4069 4~8~ 4294 4400 4606 4707 4889 49il 49~6 ,68 86 09 80 6~ 59 2.~ 89 66 42 ,00 76 7"4 05 8~ 1 454,48 'i 526, :34 1562, ,.'.'.4 16S4, ,:t:7 i 782 93 J815 J7 ~87:? 87 i900 I:::; 't 923 ,. 75 BP WELL $--23 SltqGLE SHOT SLtRVEY dO8 NO A-0990-023 COMPIdTER- t i OCT ':30 KE! EL~',' 64 ~F, FT INTERPOLATED VALUES FOR EVEN TRUE HEASLIRED VERTICAl_ DEPTH DEPTH l O(iO FEET OF Id. EASURED DEPTH, ~ LIB SEC, TOTAL COORD ItqATES 0 O, -65 I O00 i 000, 935, 2000 2000, i935, 3000 2999, 2935 5000 4666, 460i 6000 531 t , 5246 7000 5999, 5934 8000 5638, 662~ 9000 7404. 7~40 0000 8072, 8008 0872 8670. 8606 O0 2,48 S 2,48 S 9,9~ N 287,67 FI 146 '~..I2,94 N 42"' 22'96,02 N 974 2959,82 N 1265 3600,83 N i540, ,4302,54 N ~785 49!6,81 N '194~ 08 W 61 E 98 W !.7, tO 72 W 46 bJ 4'5 W ~5 W 86 W AOGCC GEOLOGICAL MATERIALS ~NV~NTORY UST PERMIT # ,. ? ~, - /.g ~ CO!dPLETiONDATE // ! WELL NAME /z~Z~ x ! ~o CO. CONTACT cl]ecl~ otl or list data as it is received,*!!st received date for 407. if not required list as NR .... '~'"? !*..~/',,'/f/ I drillin~ history! ~' s.~eyl~'! weU tests ~41'c~re descrirao~ Cored int~als core analysis ~" d~,ditch inte~als * digital data , , ~~ c~) ~ I i ........ LOG -"'-'n': ~ , ,~-~- RUN INTERVALS SCALE NO. {to thc nearest foot~ [inchl100'1 i31 ,, (/: ~ ~,~9~, " ' ~ , , , 111 C ~ / ~2oo- //~ ~ i i iii 12i' p E~F .......... / / o g/~ - / / r~o ~ .... i , ~ .................i ........ ........... ~ , * , ~ , , BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :12/14/90 T#:81938 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. G-17 '/ GR/CCL 11/27/90 #2 11100-11340 Camco 5" M-28 ,/ Inj/Temp 11/28-29/90 #1 8600-8935 Camco ,~ ',', R-03 ~, Inj 11/29/90 #1 10200-10560 Camco 5" S-23 Prod- F 11/29/90 #1 11100-11500 Camco 5" W-17 ,/ GR/Collar 11/27/90 #1 11000-11882 Camco Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED DEC 211990 Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE:I 1/08/90 EXXON T#: 81805 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM T~q.De & Transmittal Only BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. CASED HOLE: S-23 CH/CNL 10/15/90 · #1 SCH#74128 1600BPI 7560-11550 TAPE POS.#07412 AP1#50-029-22088 OPEN HOLE: F-38 DIFL/BHC/FMT/CN 10~26~90 ATLAS#4637 1600BPI · -. ~._": ~_ .... _ -; #1&2 Information Control Well Records LR 2-1 J. Dietz/S. McCurry RECEIVED NOV '1 4 1990 Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :11/09/90 T#:81797 FROM: SUBJECT: Information Control Well Records LR2-1 ,BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. S-23 Perf 11/03/90 #1 10680-11550 Sch 5" S-28 CBT 11/05/90 #1 9410-10030 Sch 5" S-28 CET 11/05/90 #1 2520-10046 Sch 5" S-28 WD Packer Setter 11/04/90 #1 9620-9920 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR RECEIVED NOV 1 4 1990 Alaska 011 & Gas Cons. Comml,~ion Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE:I 1/05/90 EXXON T#: 81627 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM ..Tape & Transmittal Only BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. S-23 RWD DUAL PROP RGD NPFD 10/08/90 #13 TELECO#TAK781 1600BPI S-23 RWD DUAL PROP RGD NPFD 10/08/90 #13 TELECO#TAK781 1600BP! 10900-11650 TAPEPOS#07404 AP!#50-029-22088 11250-11600 TAPEPOS#07405 AP1#50-029-22088 RECEIVED NOV 1 4 1990 Alaska 011 & Gms Cons. Commission Anchorage Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson ElouJevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907} 561-5111 TO: DISTRIBUTION Date :10/19/90 T#:81751 FROM' SUBJECT: Information Control Well Records LR2-1 BP (~ASED HOLE FINALS Enclosed is your copy of the matedai listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. .~"~-24 Prod-F 10/12/90 #2 9000-9585 Sch 5" ¢---1~- 12 Prod- F 10/14/90 #1 9550-9721 Sch 5" ,..~N~15 Per/ 10/14/90 #1 9650-10161 Sch 5" ,,.-'S- 23 CBT 10/15/90 #1 2700-11550 Sch 5" ./S-23 CET 10/15/90 #1 2700-11573 Sch 5" /~S<23 CNL 10/15/90 #1 7650-11528 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED Telecopy No. (907) 276-7542 September 12, 1990 G W Kirton PBU Lead Engineer BP Exploration (Alaska) Inc P 0 Box 196612 Anchorage, ~ 99519-6612 Re: Prudhoe Bay Unit S-23 BP Exploration (Alaska) Inc Permit ~ 90-127 Surf Loc 163i'SNL, 4336'WEL, Sec 35, T12N, R12E, UM Btm~hole Loc 1382'SNL, 976'WEL, Sec 27, T12N, R12E, UM Dear Mr Kirton: Enclosed is the approved application ior permit to drill the above referenced well, The permit to drill does not exempt you from obtaining additional pe~its required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE tests that it wishes to witness. Sincerely, Lonnie C: Smith Commissioner BY O~E~. OF T~ COMMISSZON jo encl Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll-Illb. Type of well.'i~'x'ploratoryl-i Stratigraphic Testl-I Development Oill~l Re-Entry [] Deepen []1 Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exo/oration KBE = 66' fee t Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 2~25~ 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(se,, 2o AAc 25.025) 1631' SNL, 4336' WEL, SEC. 35, T12N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 1600' SNL, 900' WEL, SEC. 27, T12N, R12E S-23 (42-27-12-12) 2S100302630-277 At total depth 9. Approximate spud date Amount 1382'SNL, 976' WEL, SEC. 27, T12N, R12E September25, 1990 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(uOandTVD) property line ADL 28257 @ 976' feet S-21 @ 3877'/28' feet 2560 11650'MD/9197'TVDfeet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25.035 (e)(2)) Kickoff depth 2soo'feet Maximum hole ancjle,~7.;~6 o Maximum surface 3330 pslg At total depth (TVD) 8800'/~90 pslg 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 20" Cond. 80' Surface 110' 110' 16" 13-3/8" 68tt L-80 Butt 2650' Surface 2680' 2680' 1996 cu ft Arcticset II & III 12-1/4" 9-5/8" 4711 NT80-~ NSCC 10958 Surface 10988' 8749' 2392 cu ft Class G 8-1/2" 7" 2611 NT-80 NSCC 912' 10738' 8580' 11650' 9791' 293 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Sct°rnUdC3~:tr°arl R ECEIV ED Surface Intermediate Production S E P - 7 Liner Perforation depth: measured Alaska 0il & Gas Cons. (;0~ true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drillincj fluid proc, lram [] Time vs depth pict [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~-t./~- Title PBU Lead Engineer ~//~/~ ~ Date Commission Use Only Permit Number IAPI number IAppr°~)~ ~tL~/90 See cover letter C~ ,/,Z 7 150'OZ-~- ~ ~ o ~?",~' for other requirements Conditions of approval Samples required [] Yes J~NO Mud Icg required []Yes ~ No Hydrogen sulfide measures [] Yes ,J~ No Directional survey requ~recl ~1~ Yes [] No Required working pressure for BOPE ~. []2M; []3_M; I~5M; I-I10M; I-I15M; Approved by -,~' ~ i' '; ~ , by order of Commissioner tne commission Date Form 10-401 Rev. 12-1-85 Submit in triplicate 20" Conductor PR: IMINARY WELL PLAN WELL S-23 (~-2-27-12-12) PBU PROPOSED DEPTH BKB 110' Ball Valve 2100' 13-3/8" Casing Shoe 16" Open Hole 2680' 2700' Cement Top 30OO' 4-1/2" 12.6# L-8OTDS. Tubing with 5 GLM's 9-5/8" Packer 7" Tieback Assembly RE6.E VED Gas ~ons. ~o L4~.,hO~e 9-5/8" Shoe 12-1/4" Open Hole 7" 26# NT-80 Liner 7" PBTD 7" Liner Shoe 8-1/2" Open Hole 10988' 10998' 11610' 11 650' 11650' PROPOSED DRILLING AND COMPLETION PROGRAM WELL S-23 [42-27-12-12] PBU AF~ No. 125273 Install and cement 80' of 20" conductor to surface. The drilling fluid program will consist of an 8.5 - 9.5 ppg spud mud in the 16" hole, a 9.0 - 9.7 ppg water base mud in the 12-1/4" hole and a 9.0 ppg water base mud in the 8-1/2" hole. Drill 16" hole to 2700' TVD(BKB) and cement 13-3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 3710 psi at 8800' TVD(SS) based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVD(SS) and an oil column to 8800' TVD(SS). Directional drill 12-1/4" hole to the 9-5/8" casing point above the Sag River Sandstone. Run 9-5/8" 47# L-80 NSCC casing to within 5' of 12-1/4" TD and cement with Class G cement around the 9-5/8" shoe. The annulus will be freeze protected by dry crude. Directional drill 8-1/2" hole to TD. Run 7" liner from TD to 250' inside 9-5/8" casing shoe and cement using Class G cement. Clean out to 7" float equipment. Change over to NaCI completion fluid. Test casing and lap to 3000 psi. Run 9-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree with diesel. Displace tubing to diesel. Set and test packer. Shut down rig operations for perforating subsequent to rig release. will be perforated in accordance with normal practices. The well Fluids incidental to the drilling of a well will be pumped down the 9-5/8" x 13- 3/8" annulus of the well. Tubing Size: 4-1/2", 12.6# L-80 TDS TBG with 5 GLM's. Tailpipe Size: 4-1/2", 12.6# L-80 TDS TAILPIPE DH: 8-10-90 RECEIVED SEP - ? 1990 Alaska Oil & Gas Cons. Commission /~nehorage PRELIMINARY WELL PLAN WELL: S-23 AFE NUMBER: LOCATION: Surface: Target: T.D.: 1631' SNL, 1600' SNL, 1382' SNL, [42-27-12-12] 4336' WEL, 900' WEL, 976' WEL, PBU Sec. 35, T12N, R12E Sec. 27, T12N, R12E Sec. 27, T12N, R12E ESTIMATED START: October 1990 OPR. DAYS TO COMPLETE: 24 Nabors 18E MAX ANGLE/SECT COURSE/KOP/BUILD RATE: 47.36/N 19.2 W/2800/2.5 Item TVD(SS) MD(BKB) Mud Wt, 20" CONDUCTOR 80 13-3/8" SHOE 2614 BASE WEST SAK FORMATION 5225 9-5/8" SHOE 8683 TOP SAG RIVER SANDSTONE 8697 TOP SADLEROCHIT 8835 TARGET 8918 TOTAL DEFFH 9131 110 8.5 2680 9.5 5882 9.0 10988 9.7 11008 9.0 11212 9.0 11335 9.0 11650 9.0 LOGGING PROGRAM: Open Hole - Record all logs on magnetic tape where applicable. 12-1/4" Hole: None 8-1/2" Hole: DIL/BHC/CNL/GR (OPTIONAL LDT) Cased Hole CBT/CET/Gyro DH: 8-10-90 and perforate after rig release (if wireline perforating.) ,R;E EIVED BOP STACK CONFIGURATION 13 5/8", 5000 PSi WP TRIPLE RAM STACK DRILLING RISER ANNULAR PREVENTER 2" KILL LINE PIPE RAMS MANUAL HYDRAULIC 'GATE GATE BLIND RAMS i DRILLING SPOOL 4" CHOKE LINE HYDRAULIC MANUAL GATE- I PIPE RAMS I ^ ECEIVED S E P - ? 1990 Nasl&l Oil & Gas Cons. SURFACE HOLE DIVERTER SYSTEM Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. J 10" Full Opening Valves 35' or as required -I Dresser Sleeve 10" Diverter Line NOTES 1. All pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. F,,,II'OF~-,~;~ 2. Manual lO",l~valves mechanically connected to ensure that one valve is fail-safe open at all times. 3. All turns are 90 deg. and targeted. 10" Full opening ball valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet RECEIYED S EP - 1' 1990 ~]~J~ .Oil J~ 6as (;0115..~;).Et.i]~ R L. 12/18/89 MUD WEIGHT CALCULATIONS WELL S-23 (42-27-12-12} Mud Wt. (8-1/2" Hole): P @ Sag River: P @ Sadlerochit: P @ Top S adlerochit: OB @ Sag River: OB @ Top Sadlerochit: Current GOC: 9-5/8" Casing Shoe: Top Sag River: Top Sadlerochit: 9.0 ppg. 3900 psi. 3800 psi. at 8800' TVDSS 3814 psi. 201 psi. 352 psi. Not Present 8749' TVDBKB 8763' TVDBKB 8901' TVDBKB CEMENT CALCULATION 13-3/8" CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 2680' 2 X Annular Volume 1996 cu ft 1231 cu ft (634 Sx Arcticset III @ 1.94 Cu ft/Sk) 765 cu ft (822 Sx Arcticset II @ 0.93 Cu ft/Sk) 9-5/8"CASING Measured Depth: 10988' Basis: 90% Annular Volume to 13-3/8" + 50 cu ft Total Cement Vol: 2392 cu ft Lead Slurry Vol: 1817 cu ft (1015 Sx G+8% @ 1.79 Cu ft/Sk) Tail Slurry Vol: 575 cu ft (500 Sx Neat G @ 1.15 Cu ft/Sk) 7" LINER Measured Depth: 10738' (Hanger) - 11650' (Shoe) Basis: 1.5 X Annular volume to 9-5/8" shoe + 150 cu ft Total Cement Vol: 293 cu ft (253 Sx @ 1.16 Cu ft/Sk) DH: 8-10-90 RECEIVED SEP - 1 1990 /~ ~lt & Gas Cons. ~ommissio.[~ $45DUA124:[DRAN034]S23 CLOSAP SHORT.LIS;2 10-AUG-1990 ---- Closest Approach Analysis --- Date: 10-AUG-90 Time: 10:10:56 Search Radius= 200 COURSE LINE For proposed well: S-23 [42-27-12-12] Location = W-E S-N TVD(SBS) Top 619104.00 5979854.00 -66.00 Bottom 616994.83 5985617.40 9390.00 Note: Ail depths in feet Below Kelly Bushing (BKB) 10:11 Page Closest Approach WELL IDENT /PROPOSED% /NEARBY\ CLOSEST TVD DEPART TVD DEPART DISTANCE A029-2069500 S-3 1642.5 0.0 A029-2069800 S-2 2868.8 1.5 A029-2071701 S-1 2299.1 0.0 A029-2077100 S-9 NO COORDINATE POINTS A029-2077800 S-8 NO COORDINATE POINTS A029-2095900 S-4 892.0 0.0 A029-2111300 S-15 4106.1 408.9 A029-2112300 S-16 2466.0 0.0 A029-2161100 S-19 3266.4 48.4 A029-2163700 S-20 1604.3 0.0 A029-2203600 S-21 ( 3877.3 269.4 A029-2204400 S-24 ( 199.8 0.0 1643.6 10.9 31.5 2870.6 29.9 53.0 2299.5 35.2 173.0 WITHIN SPECIFIED SEARCH WINDOW WITHIN SPECIFIED SEARCH WINDOW 900.0 6.3 141.0 4243.2 560.7 242.4 2483.8 112.7 410.7 3272.7 16.6 85.9 1609.0 31.5 34.4 3888.3 276.2 27.7 200.0 0.2 108.8 SUMMARY The well which comes closest to A029-2203600 S-21 Closest approach distance = KICK OFF for this run = the proposed well is: 27.7 feet 2800.0 feet Vertical /PROPOSED\ TVD DEPART Intersection /NEARBY% TVD DEPART VERTICAL DISTANCE 3913.3 289.2 3971.8 319.7 59.8 3794.4 227.5 4273.8 585.8 476.? 4021.5 352.9 4777.5 802.4 754.8 3531.0 120.3 2319.6 136.3 -1212.5 $45DUA124:[DRAN034[S23 CLOSAP SHORT7.LIS;2 10-AUG-1990 --- Closest Approach Analysis ---- Date: 10-AUG-90 Time: 10:11:40 Search Radius= 200 7 DEGREE LEAD LINE For proposed well: S-23 [42-27-12-12] Location = W-E S-N TVD(SBS) Top 619104.00 5979854.00 -66.00 Bottom 616308.17 5985317.40 9390.00 Note: All depths in feet Below Kelly Bushing (BKB) 10:11 Page Closest Approach WELL IDENT /PROPOSED% /NEARBY~ CLOSEST TVD DEPART TVD DEPART DISTANCE A029-2069500 S-3 1642.5 0.0 A029-2069800 S-2 2879.4 1.7 A029-2071701 S-1 2299.1 0.0 A029-2077100 S-9 NO COORDINATE POINTS A029-2077800 S-8 NO COORDINATE POINTS A029-2095900 $-4 892.0 0.0 A029-2111300 S-15 4031.4 358.9 A029-2112300 S-16 2466.0 0.0 A029-2161100 S-19 3288.7 52.9 A029-2163700 S-20 1604.3 0.0 A029-2203600 S-21 ( 4031.4 358.9 1643.6 10.9 31.5 2881.1 30.7 52.8 2299.5 35.2 173.0 WITHIN SPECIFIED SEARCH WINDOW WITHIN SPECIFIED SEARCH WINDOW 900.0 6.3 141.0 4157.3 493.9 236.3 2483.8 112.7 410.7 3294.3 17.1 79.7 1609.0 31.5 34.4 4048.8 362.9 46.5 A029-2204400 S-24 ( 199.8 0.0 SUMMARY The well which comes closest to A029-2069500 S-3 Closest approach distance = KICK OFF for this run = 200.0 the proposed well is: 31.5 feet 2800.0 feet 0.2 ~, 108.8 ~,,.. Vertical /PROPOSED\ TVD DEPART Intersection /NEARBY\ TVD DEPART VERTICAL DISTANCE 5539.8 1884.0 6193.5 1916.5 655.1 6813.0 3266.8 8073.1 3298.8 1261.4 3731.7 198.5 4226.1 547.0 491.7 3920.1 292.9 4711.0 730.8 789.8 3667.0 170.6 2510.3 189.1 -1157.8 · z.¸ ! TRIP TANK I~I U D H,OP?E i~ PI L L. T~J K. lDO ~6C I, ULUH ~ T,~ K D~G.A 5SER T^N K H40 V'~C u Utt T Y F~: -- -- - Choke .Manifold - Poor Boy Degasser · - ~:andt Vacuum.-?ype Degasser - Brandt Dua[ Tandem Shale S~aker - ?toneer Hud Cleaners - Pioneer HKI Centrifuge DISTRII~JTION DFrc PIT 1 - Recording drilling fluid, pit 'level indica~0r with both visual and audio warning devices at driller's console 1 - Trip Tank (75 BBL.) 1 - Drilling fluid flow sensor with readout at driller's console 11 - 5 Hp AgitatOrs CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE F e_.a~ /CPc. ?//o/9o (2 thru 8) (3) Admin ~/°r- ~o~ 9. . lbru f3) ' ' 10. .~< ~-/~-~ ~. (10 and 13) 12. 13. (4) Casg (14 thru 22) (5) BOPE (23 thru 28) (6) OTHER ~?( ~/~ '(29 thr6 3i) (6) Add: ~F~, ~o/m-~ Geology: Engineering: DwJ C~'~LC s SEW rev: 01/30/89 6.011 Company ,.~. ~ . Is the permit fee attached .......................................... 2. Is well t~ be located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ...................... Lease & Well No. YES NO £ _ ~s Does operator have a bond in force .................................. Is a conservation order needed ...................................... ~- Is administrative approval needed ................................... Is the lease number appropriate .................................... ~ Does the well have a unique name and number . ~ , 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. For 29. 30. 31. 32. Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate./~I Are necessary diagrams and descriptions of ~r a~g BOPE attached..~ Does BOPE have sufficient pressure rating - Test to .~o~o psig .. ~ Does the choke manifold comply w/API RP-53 (May 84) .................. ,, Is the presence of H2S gas probable ................................. ~ exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements ............................................. INITIAL CEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE ~e/ot~o Da,z.; /-~// gqo //~ oAJ Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process · but is part of the history file. T° improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX~ ., No special'effort has been made to chronologically organize this category of information. .o LIS VERIFICATION LISTING FOR: BP EXPLORATION ALASKA WELL S-23 RELOG SECTION PRUDHOE BAY UNIT RECEIVED NOV 1 4 1990 Alaska 011 & Gas Cons. Commission Anchorage Below are the mnemonics used on the LIS tape requested by BP EXPLORATION ALASKA for the WELL S-23 Relog Section, PRUDHOE BAY UNIT. GRCM - Gamma Ray Cor [RWD] I MWD-API RACM- Resistivity (AR) Cor [RWD] I ohm-m ROPS - Rate Of Penetration l ft/hr RPCM- Resistivity (PD) Cor [RWD] I ohm-m ~ i I I | t ~ j ~ ] , J ! J I _ J ...... ] J J J ] ** reel header ** service name : DPR date : 9 O/10/26 origin :TR01 reel name : 781TAK continuation # :01 previous reel : comment :TELECO OILFIELD SERVICES PROPRIETARY FIELD TAPE ** tape header ** service name. · DPR date : 90/10/26 origin :TR01 tape name : 781TAK continuation # :01 previous tape : comments :RIG NABORS 18-E ** file header ** file name : 781TAK.REL service name : DPR version # : 1.31 date :90/10/26 maximum length : 1024 file type : LO previous file : ** information records ** table type :TOOL MNEM STAT LENG WEIG HEIG GR ALLO 0.000 0.000 0.000 RSN ALLO 72.000 0.000 0.000 DCDS ALLO 360.000 0.000 0.000 ** information records ** table type :CONS MNEM STAT PUNI TUNI VALU BS UNAL IN CS I Z UNAL I N SD UNAL F WMUD UNAL LB/G SHT UNAL DEGC BHT UNAL DEGC TD UNAL F YEAR UNAL MONT UNAL DAY UNAL IN IN F LB/G DEGC DEGC F ** information records ** 8.500 9.625 11250.000 9.000 0.000 0.000 11600.000 90.000 10.000 26.000 table type :CONS MNEM STAT mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm, SON UNAL Ri UNAL R2 UNAL R3 UNAL R4 UNAL R5 UNAL R6 UNAL R7 UNAL R8 UNAL HIDE UNAL WN UNAL CN UNAL FN UNAL FL UNAL FL1 UNAL LUL UNAL ENGI UNAL WITN UNAL DFT UNAL LONG UNAL LATI UNAL STAT UNAL COUN UNAL DMF UNAL LMF UNAL PDAT UNAL APIN UNAL PUNI TUNI VALU DUAL/PRO PAG/RES I S / NEUT/POR/FORM/DEN S I S-23 RELOG SECTION BP EXPLORATION ALASKA PRUDHOE BAY ANCHORAGE PREZGAY/REESE ALASKA NORTH SLOPE RKB RKB OS 1 UNAL OS2 UNAL OS 3 UNAL OS4 UNAL OS5 UNAL OS 6 UNAL TLAB UNAL TCS UNAL TN1 UNAL TN2 UNAL TN3 UNAL TN4 UNAL TN5 UNAL TN6 UNAL TN7 UNAL TN8 UNAL TN9 UNAL TN10 UNAL TNll UNAL TN12 UNAL SECT UNAL TOWN UNAL RANG UNAL NATI UNAL CONT UNAL MSS UNAL MFSS UNAL MCSS UNAL SLAB UNAL CLAB UNAL CS 1 UNAL CS2 UNAL CS 3 UNAL BS 1 UNAL BS 2 UNAL BS3 UNAL HLD UNAL RUN UNAL LUN UNAL OPER UNAL LCC UNAL BLI UNAL TLI UNAL EPD UNAL APD UNAL F F F F F F F F USA NAM STATE COUNTY 13.375 9.625 17.50 12.25 8.50 INCL 0.000 0.000 0.000 0.000 O.00O 0.000 0.000 0.000 t | I J i J J J ] J ..... -] ...... J ---] ....... -J J J ) . J J EKB UNAL F F EDF UNAL F F EGL UNAL F F TDD UNAL F F TDL UNAL F F CWl UNAL LB/F LB/F BS D 1 UNAL F F CBD1 UNAL F F CBL1 UNAL F F CW2 UNAL LB/F LB/F BSD2 UNAL F F CBD2 UNAL F F CBL2 UNAL F F CW3 UNAL LB/F LB/F BSD3 UNAL F F CBD3 UNAL F F CBL3 UNAL F F STEM UNAL DEGC DEGC MRT UNAL DEGC DEGC DFD UNAL LB/G LB/G DFV UNAL S S DFPH UNAL DFL UNAL C3 C3 RMFS UNAL OHMM OHMM RMS UNAL OHMM OHMM RMCS UNAL OHMM OHMM MST UNAL DEGC DEGC MFST UNAL DEGC DEGC MCST UNAL DEGC DEGC ** information records ** 64.000 63.000 0.000 11600.000 11600.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 table type :PRES MNEM OUTP STAT TRAC CODI DEST MODE GRCM GRCM ALLO TI PDEM PDEM ALLO Ti ROPS ROPS ALLO Ti RACM RACM ALLO T23 RPCM RPCM ALLO T23 DRHM DRHM DISA T2 DPEM DPEM DISA T2 R0 R0 DISA T2 LLIN LDAS LSPO LDAS LLIN MGAP LSPO LDAS NB WRAP WRAP NB NB NB NB GRAD TENS TENS D I SA T 3 LGAP NPHI NPHI DISA T23 LSPO DPHI DPHI DISA T23 LLIN 11 DUMM DI SA T2 LGAP 12 DUMM DISA T1 LLIN 13 DUMM DISA Ti LLIN 14 DUMM DISA Ti LLIN 15 DUMM DISA T1 LLIN 16 DUMM DISA Ti LLIN 17 DUMM DISA Ti LLIN 18 DUMM DISA Ti LLIN 19 DUMM DISA Ti LLIN ** information records ** BOTH 2 2 1 NEIT NEIT NEIT NEIT NEIT NEIT NEIT NEIT SHIF SHIF SHIF GRAD NB NB NB NB NB NB NB NB table type :FILM MNEM GCOD GDEC DEST DSCA 1 EEE PF1 S2 2 EEE .... PF2 S5 ** information records ** table type :AREA MNEM STAT BEGI END PATT DEST 1 ALLO DPHI NPHI GAS 2 DISA Z1 Z1 BLAN 3 DISA Z1 Z1 BLAN 4 DISA Z1 Z1 BLAN 5 DISA Z1 Zl BLAN 6 DISA Z1 Z1 BLAN 7 DISA Z1 Z1 BLAN 8 DISA Z1 Z1 BLAN ** data-format record ** entry blocks type 4 8 9 size repr code entry 1 66 255 4 68 60.000 4 65 .liN 2 NEIT NEIT NEIT NEIT NEIT NEIT NEIT 12 4 68 0 2 79 -9999.000 0 datum specification blocks WARNING the following table is in LIS Datum Specification Block Sub-Type 0 and the API Type Codes may be Unreliable!!! mnem service service unit api api api api file size spl repr id order # log type class mod no. code DEPT FT 00 000 00 00 0 4 1 68 GRCM 00 000 00 00 0 4 1 68 RACM 00 000 00 00 0 4 .1 68 ROPS 00 000 00 00 0 4 1 68 RPCM 00 000 00 00 0 4 1 68 process level depth = GRCM depth = GRCM depth = GRCM depth = GRCM depth = GRCM depth = GRCM depth = GRCM depth = GRCM depth = GRCM 11250.0000 feet .... 3429.0000 meters 1.0000 RACM 1.0000 ROPS 1.0000 RPCM 11275.0000 feet .... 3436.6200 meters -9999.0000 RACM -9999.0000 ROPS -9999.0000 RPCM 11300.0000 feet .... 3444.2400 meters 35.3340 RACM 8.1320 ROPS -9999.0000 RPCM 11325.0000 feet .... 3451.8600 meters 23.2560 RACM 7.8690 ROPS 54.9120 RPCM 11350.0000 feet 38.9720 RACM 3459.4800 meters 5.8890 ROPS 121.7500 RPCM 11375.0000 feet 36.6850 RACM 3467.1000 meters 4.7760 ROPS 66.6790 RPCM 11400.0000 feet 21.8030 RACM 3474.7200 meters 4.9870 ROPS 108.7730 RPCM 11425.0000 feet 26.1620 RACM 3482.3400 meters 4.1820 ROPS 102.3670 RPCM 11450.0000 feet 30.6190 RACM 3489.9600 meters 4.4930 ROPS 203.2250 RPCM 1.0000 -9999.0000 9.0940 7.1060 5.3650 5.6620 5.4310 5.7150 6. 1860 depth = GRCM depth = GRCM depth = GRCM depth = GRCM depth = GRCM depth = GRCM 11475.0000 feet 18.8950 RACM 3497.5800 meters 2.3750 ROPS 74.1620 RPCM 11500.0000 feet 28.9430 RACM 3505.2000 meters 1.7710 ROPS 96.1000 RPCM 11525.0000 feet 18.1990 RACM 3512.8200 meters 1.3750 ROPS 94.4280 RPCM 11550.0000 feet .... 3520.4400 meters -9999.0000 RACM -9999.0000 ROPS 68.5660 RPCM 11575.0000 feet 3528.0600 meters -9999.0000 RACM -9999.0000 ROPS -9999.0000 RPCM 11600.0000 feet .... 3535.6800 meters -9999.0000 RACM -9999.0000 ROPS -9999.0000 RPCM 4.2350 2.5410 2.3970 -9999.0000 -9999.0000 -9999.0000 ** file trailer ** file name :781TAK.REL service name.-DPR version # : 1.31 date :90/10/26 maximum length :1024 file type :LO next file name : cf'O - LIS VERIFICATION LISTING FOR: BP EXPLORATION ALASKA WELL S-23 PRUDHOE BAY UNIT NO¥ 1 ~ ~990 Alaska Oil & ~as Cons. Commission knchorage Below are the mnemonics used on the LIS tape requested by BP EXPLORATION ALASKA for the WELL S-23, PRUDHOE BAY UNIT. BDCM - Bulk Density Compensated [RWD]lg/cc DPEM - Photoelectric Cross Sect [RWD]IB/e DRHM - Delta RHO - Density Cor [RWD]lg/cc GRCM - Gamma Ray Cor [RWD]IMWD-API NFBM - Neutron Far Base [RWD]Icps NNBM - Neutron Near Counts [RWD]lcps NPSM - Neutron Porosity (SS) [RWD]Ip.u. PDEM - Phase Difference - Elapsed Timelseconds RACM - Resistivity (AR) Cor [RWD]lohm-m ROPS - Rate Of Penetrationlft/hr RPCM - Resistivity (PD) Cor [RWD]lohm-m TVD - True Vertical Depth ** reel header ** service name :DPR date :90/10/26 origin :TR01 reel name :781TAK continuation # :01 previous reel : comment :TELECO OILFIELD SERVICES PROPRIETARY FIELD TAPE ** tape header ** service name.-DPR date :90/10/26 origin :TR01 tape name :781TAK continuation # :01 previous tape : comments :RIG NABORS 18-E ** file header ** file name :781TAK. 001 service name :DPR version # : 1.31 date :90/10/26 maximum length :1024 file type :LO previous file : ** information records ** table type :TOOL MNEM STAT LENG WEIG HEIG GR ALLO 0.000 0.000 0.000 RSN ALLO 72.000 0.000 0.000 DCDS ALLO 360.000 0.000 0.000 ** information records ** table type :CONS MNEM STAT PUNI TUNI VALU BS UNAL CS I Z UNAL S D UNAL WMUD UNAL SHT UNAL BHT UNAL TD UNAL YEAR UNAL MONT UNAL DAY UNAL ** information records ** IN IN F LB/G DEGC DEGC F IN IN F LB/G DEGC DEGC F table type MNEM :CONS STAT PUNI TUNI SON UNAL Ri UNAL R2 UNAL R3 UNAL R4 UNAL R5 UNAL R6 UNAL R7 UNAL R8 UNAL HIDE UNAL WN UNAL CN UNAL FN UNAL FL UNAL FL1 UNAL LUL UNAL ENGI UNAL WITN UNAL DFT UNAL LONG UNAL LATI UNAL STAT UNAL COUN UNAL DMF UNAL LMF UNAL PDAT UNAL APIN UNAL 8.500 9.625 10900.000 9.000 0.000 0.000 11650.000 90.000 10.000 26.000 VALU DUAL/PRO PAG/RES I S /NEUT/POR/FORM/DEN S I S-23 BP EXPLORATION ALASKA PRUDHOE BAY ANCHORAGE PREZGAY/REESE ALASKA NORTH SLOPE RKB RKB OS1 OS2 OS3 OS4 0S5 OS6 TLAB TCS TN1 TN2 TN3 TN4 TN5 TN6 TN7 TN8 TN9 TNiO TNll TN12 SECT TOWN RANG NATI CONT MSS MFSS MCSS SLAB CLAB CS1 CS2 CS3 BS1 BS2 BS3 HLD RUN LUN OPER LCC BLI TLI EPD APD UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL USA NAM STATE COUNTY 13.375 9.625 17.50 12.25 8.50 INCL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 EKB UNAL F EDF UNAL F EGL UNAL F TDD UNAL F TDL UNAL F CW1 UNAL LB/F BSD1 UNAL F CBD1 UNAL F CBL1 UNAL F CW2 UNAL LB/F BSD2 UNAL F CBD2 UNAL F CBL2 UNAL F CW3 UNAL LB/F BSD3 UNAL F CBD3 UNAL F CBL3 UNAL F STEM UNAL DEGC MRT UNAL DEGC DFD UNAL LB/G DFV UNAL S DFPH UNAL DFL UNAL C3 RMFS UNAL OHMM RMS UNAL OHMM RMCS UNAL OHMM MST UNAL DEGC MFST UNAL DEGC MCST UNAL DEGC ** information records ** F F F F F LB/F F F F LB/F F F F LB/F F F F DEGC DEGC LB/G S C3 OHMM OHMM OHMM DEGC DEGC DEGC 64. 63. 0. 11650. 11650. 0. 0. 0. 0. 0. 0. 0. 000 000 000 000 000 000 000 000 000 000 000 000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 table type :PRES MNEM OUTP STAT TRAC CODI DEST MODE GRCM GRCM ALLO Ti PDEM PDEM ALLO Ti ROPS ROPS ALLO Ti NPSM NPSM ALLO T23 BDCM BDCM ALLO T23 DRHM DRHM ALLO RHT2 DPEM DPEM ALLO RHT2 RO RO DISA T2 LLIN LDAS LSPO MDAS LLIN MGAP LSPO LDAS WRAP WRAP WRAP NB WRAP NB NB GRAD TENS TENS DISA T3 LGAP NPHI NPHI DISA T23 LSPO DPHI DPHI DISA T23 LLIN 11 DUMM DISA T2 LGAP 12 DUMM DISA T1 LLIN 13 DUMM DISA T1 LLIN 14 DUMM DISA T1 LLIN 15 DUMM DISA T1 LLIN 16 DUMM DISA T1 LLIN 17 DUMM DISA T1 LLIN 18 DUMM DISA T1 LLIN 19 DUMM DISA T1 LLIN ** information records ** BOTH 2 2 1 NEIT NEIT NEIT NEIT NEIT NEIT NEIT NEIT SHIF SHIF SHIF GRAD NB NB NB NB NB NB NB NB table type :FILM MNEM GCOD GDEC DEST DSCA 1 EEE .... PF1 S2 2 EEE .... PF2 ' S5 ** information records ** table type :AREA MNEM STAT BEGI END PATT DEST 1 ALLO DPHI NPHI GAS 2 DISA Z1 Z1 BLAN 3 DISA Z 1 Z 1 BLAN 4 DISA Z1 Z1 BLAN 5 DISA Z1 Z1 BLAN 6 DISA Z1 Z1 BLAN 7 DISA Z1 Z1 BLAN 8 DISA Z1 Z1 BLAN ** data-format record ** entry blocks type 4 8 9 size repr code entry 1 66 255 4 68 60.000 4 65 .liN 2 NEIT NEIT NEIT NEIT NEIT NEIT NEIT ! j J j J J ........ J ....~1 ...... ! ....... J J J ) i i ! ] } ] 12 4 68 0 2 79 datum specification blocks WARNING the following table is Sub-Type 0 and the API in LIS Type mnem service service unit api api id order # log type DEPT FT 00 000 BDCM 00 000 DPEM 00 000 DRHM 00 000 GRCM 00 000 NFBM 00 000 NNBM 00 000 NPSM 00 000 PDEM 00 000 RACM 00 000 ROPS 00 000 RPCM 00 000 TVD 00 000 -9999.000 0 Datum Specification Block Codes may be Unreliable!!! api api file class mod no. 00 0O 0 00 00 0 00 00 0 00 00 0 00 00 0 00 00 0 00 00 0 00 00 0 00 00 0 00 00 0 00 00 0 00 00 0 00 00 0 size spl repr code 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 0 0 0 0 0 0 0 0 0 0 0 0 0 process level depth = 10900.0000 feet BDCM 1.9520 DPEM 8.4720 NFBM 13.6420 NNBM 6187.0000 RACM 0.1000 ROPS 144.8030 depth = 10950.0000 feet BDCM 2.6450 DPEM NFBM 22.7440 NNBM RACM 7.9240 ROPS depth = 11000.0000 feet BDCM 2.4900 DPEM NFBM 30.5530 NNBM RACM 7.6020 ROPS depth = 11050.0000 feet BDCM 2.3440 DPEM NFBM 38.6360 NNBM RACM 11.6850 ROPS 3322.3200 meters DRHM -0.8600 NPSM 54.9630 RPCM -9999.0000 3337.5600 meters 3.9520 DRHM 0.2330 6680.5088 NPSM 17.5180 26.7760 RPCM 8.1240 3352.8000 meters 2.7920 DRHM 0.1400 6995.4932 NPSM 23.2400 47.6070 RPCM 7.7220 3368.0400 meters 3.4680 DRHM -0.0150 7110.5576 NPSM 20.3510 12.0010 RPCM 10.0280 GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD 183.5590 6.3700 8691.1621 209.4520 39.2670 8725.8359 59.6570 22. 3170 8760.3809 102.2900 63.9670 8794.8926 depth = BDCM NFBM RACM depth = BDCM NFBM RACM depth = BDCM NFBM RACM depth = BDCM NFBM RACM depth = BDCM NFBM RACM depth = BDCM NFBM RACM depth = BDCM NFBM RACM depth = BDCM NFBM RACM depth = BDCM NFBM RACM 11100.0000 feet 3383.2800 meters 2.5960 DPEM 3.6840 DRHM 0.1360 23.3270 NNBM 6694.2822 NPSM 37.5940 4.5030 ROPS 17.3450 RPCM 3.7950 11150.0000 feet 3398.5200 meters 2.6830 DPEM 4.3270 DRHM 0.0630 83.0070 NNBM 7636.4355 NPSM 7.8980 88.'6040 ROPS 22.4630 RPCM 170.3200 11200.0000 feet .... 3413.7600 meters 2.4840 DPEM 3.0150 DRHI~ 0.1340 32.3570 NNBM 7073.7100 NPSM 21.8540 17.3440 ROPS 91.7660 RPCM 23.1510 11250.0000 feet .... 3429.0000 meters 2.4480 DPEM 3.3010 DRHM 0.1490 31.0630 NNBM 7047.4375 NPSM 23.4160 16.3620 ROPS 105.2640 RPCM 15.9190 11300.0000 feet 3444.2400 meters 2.5840 DPEM 3.4750 DRHM 0.2190 29.4690 NNBM 6967.8711 NPSM 23.2790 12.0350 ROPS 27.5280 RPCM 9.9050 11350.0000 feet .... 3459.4800 meters 2.3630 DPEM 2.5850 DRHI~ 0.1660 24.5920 NNBM 6983.5527 NPSM 29.3880 8.4400 ROPS 147.6380 RPCM 8.6590 11400.0000 feet 3474.7200 meters 2.3170 DPEM 2.7070 DRHM 0.1280 5.9250 NNBM 7061.6094 NPSM 28.1680 7.9910 ROPS 79.8290 RPCM 8.7160 11450.0000 feet 3489.9600 meters 2.4220 DPEM 2.5520 DRHM 0.2330 7.4770 NNBM 7072.5615 NPSM 17.9430 4.2310 ROPS 143.8810 RPCM 4.8980 11500.0000 feet 3505.2000 meters 2.5340 DPEM 3.4940 DRHM 0.3180 29.1090 NNBM 7009.5283 NPSM 24.1880 2.0870 ROPS 115.4110 RPCM 1.7800 GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD 153.5790 33.6670 8829.6660 76.7070 44.5170 8864.4824 39.8250 22.1120 8899.6191 29.4320 9.0870 8934.7441 97.6820 20.1670 8969.7891 31.9950 12.5500 9004.7832 21.2910 8.4000 9039.6445 24.5790 21.9700 9074.4395 29.5800 16.9310 9109.2344 depth = 11550.0000 feet 3520.4400 meters BDCM 2.4040 DPEM 3.2010 DRHM 0.2770 NFBM 31.9620 NNBM 7074.0225 NPSM 21.3890 RACM 1.9770 ROPS 72.7260 RPCM 1.9850 depth = 11600.0000 feet .... 3535.6800 meters BDCM 2.3120 DPEM 2.0500 DRHM 0.2510 NFBM -9999.0000 NNBM -9999.0000 NPSM -9999.0000 RACM 1.8950 ROPS 86.1100 RPCM 1.9350 depth = 11650.0000 feet .... 3550.9200 meters BDCM -4.7510 DPEM -0.2400 DRf{M -10.2010 NFBM -9999.0000 NNBM -9999.0000 NPSM -9999.0000 RACM -9999.0000 ROPS -9999.0000 RPCM -9999.0000 GRCM PDEM TVD GRCM PDEM TVD GRCM PDEM TVD 18.5230 34.3920 9144.0312 23.4780 9.8330 9178.8262 -9999.0000 -9999.0000 9213.6230 ** file trailer ** file name :781TAK. 001 service name :DPR version # : 1.31 date :90/10/26 maximum length :1024 file type :LO next file name : ~ ,~L~SKA CDMPU'TING CENTER CDMPANY NAME : 5.P. EXPLCRATION WELL N,~ME : S - 23 FIELD NA~E : PRUDHOE ~AY ~O~OUGH : NORTH SLOPE ST,~T E : ALASKA API NUMBER : 50-029-Z20-B8 REFERENCE ND : 74128 RECEIVED NOV I 4 1990 Alaska Oil & Gas Cons. Commission Anchorage IS T~.PE VERiFICaTION LISTING CHLUM~ERGER ALASK~ COMPUTING CENTER 5-NOV-1990 1'9:157 **~* REEL HEADER SERVICE ~N~ME : EgIT DATE : 90/11! 5 REEL NAME : CgNTIN'U~TiON ~ : PREVIOUS REEL : COMMENT : B.P. EKPLO~AT[ON,PRUgHgE ~Y,.'S - 2~,50-02'9-22088 **~-* TAPE HEADER SERVICE NAME : EDIT O~TE : 90111/ 5 ORIGIN : FL!C T~PE NAME : CONTINUATION ~ : ~ P~EVIOUS ~TAPE : ' . T' P~UgHOE B~Y, S - 23,50-029-2208B COMMENT . ~ P. EXPLORA ~ON, . *~** FILE HE ~.DER '~ FILE N~ME : EDIT .001 SERVICE : FLIC VERSION : DATE : 90/I1/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST ~=ILE : · ~ SCMLUMBERG:,:_R WELL SERVICES CO~ANY N,~ME: ~.P. EXPLORATION WELL: S - 23 FIELD: PRUOHOE BAY BOROUGH: NORTH SLOPE STATE: API NUMBER: LOC~TION: 1631' FNL~ 4335' FEL SECTION: 35 TOWNSHIP: RANGE: PERMANENT DATUm: ~SL ELEV&TISN: O' LOG ~5ASUPEO :R3~ R~B 6~' ABOVE PERMANENT ,IS 'T~E YERI~ICATION LISTIiNG ;CHLUMEERGER ~,LASK.~ COMPUTING CENTER 5-NOV-199D 19:57 PAGE: ELEVATIONS DATE LOGGED: RUN NUMBER: TO ORIL:LER: TO LOGGER: C~SING 1: CASING 2: CASING 3: GL: 3~5' 15-0CT-90 ! 11582' 11581' 13 3/$" ~ DRILLER DEPTH OF O' TO 2702' g 5/8" 9 DRILLER DEPTH O~ O' TO 10928' '7" @ DRILLER DEPTH O~ 10682~' TD 1162,~' TYPE FLUID IN HO:LE: ~!RINE DENSITY: 8.g LS/GAL iLOGGING DISTRICT: LOGGING ENG'INEE~: WITNESS: TOOL NUMBERS: C~L-Y-030 SGC-SA-53 C~C-DB-88 ~CEEC-C-7~5 TCM-50g PRUDHOE G. SARBER P. DUNH~M, ~o MARSH TCC-:B-2 8! CNC-H-OZ? C.~S-D &-83 CEMS-&-TO) ST~-C~-T01 DATE JOB STARTEO: f-NOV-90 JOB REFERENCE NO: 7~1,28 LOP/~N~: R. KRUWELL FIL: - EDIT.O01 .m..p. EXmLORATIDN PRUDHCE BaY .S - 23 50-029-22088 "~EPEAT ,:~LE ,~Rg~ FIELD TAPE miL.,:. ~!I" D~T,~ SAMPLEC EVERY -.5000 FEET CAT~ INCLUDEO - T 3OL EXTENS ION 'TOOL TYPE USED NAME CNT-&/D/H .CNR COMPENSATED NEUTRON .IS :TA~E VERIFICATION LISTING iCHLUM~ERGER A~ASK~ COMPUTING CE~T~ 5-NOV-1990 19:57 ~GE: TABLE TYPE : CONS TUNI VALU D~F! CN 5.P. EX~LgRA, TION FN P'qUOHOE B~Y WN S - 23 ~PIN 50-ozg-z2088 FL 1631 SECT 35 TOWN 12E RANG COUN NORTH SLOPE STAT ALASKA NATI US~ WITN P. DUNHAM, ,B. M,~RSH SON 391597 P O ~ T M S L EPD FT 0 L MF APO FT 64° EKB FT 6~. EOF FT 63. EGL FT 35. TOO FT 11582. BLI ~T 11528. TLI FT 7565. OFT BRINE D~D G/C3 8.9 COMPANY NAME FI ELD NAME WELL NAME API SERIAL NUMBER FIELD LOCA'TION SECTION TOWNSHIP RANGE COUNTY ST,~TE OR PROVINCE NATION WITNESS' NAME SERVICE ORDER NUMBER PERMANENT DATUM ELEVATION O'F PERM. D~TUM LOnG MEASURED FROM ~BOVE PERMANENT DATUM ELEVATION OF KELLY BUSHING EtEV:&TION OF OERRICK FLOOR ELEVATION OF GROUNO LEVEL TOTAL OEPTH- DRILLER 80'TTOM tOG INTERVAL TOP LOG INTERVAL DRILLING FLUID TYPE DRILLING FLUID DENSITY TADLE TYPE : CURV OEFI DEmT NmH! TNR~ RTN~ RCNT RCFT CNTC CFTC GR TENS CCL gE~TH CHANNEL NAME NEUTRON POROSITY CALIBRATED THERMAL NEUTRON RATIO qAW THERMAL NEUTRON RATIO RCNT RC~T CNTC CFTC ~AMM~ R~Y TENSICN CCL ~MPLITUDE IS TAPE V~R'IFICATION LISTING CHLUMBERGER ALASKA COMPUTING CENTER 5-NOV-1990 19:57 PASE: DATA FORMAT SPECIFIC&TION RECORD ,~'~ SET TYPE - 64E~ ~* TYPE REPR CO!D~ VALUE 2 66 0 3 T3 44 5 56 6 73 ? 65 8 ,68 0.5 9 65 mT 12 68 13 66 0 1H 65 ~T 15 ,66 58 16 66 1 0 66 0 ~ SET TYPE - CHAN ~ NaME SERV UNIT SERVICE API ~PI APl ~Pt FILE NUMB N'U~B SIZE REPR ID DROER ~ :LO'G TYPE CLASS MOD NUMB SAMP ELEM CODE P~DCESS (HEX) DEPT FT 1391597 O0 NPHI CNR PU 3'91597 O0 TNR~ CNR 391597 O0 RTNR CN~ 391597 O0 ~CNT CNR CmS '391597 O0 RCFT CNR CPS 391597 O0 CNTC CNR CPS 391597 O0 C~TC CNR CPS 391597 O0 GR CNR G~PI 391597 O0 TENS CN~ LB 39'1597 O0 CCL CNR V 391597 O0 000 O0 0 1 I I 4 68 DOD O0 0 I I I 4 68 DO0 O0 0 1 i 1 .4 68 000 O0 0 I 1 1 4 68 000 O0 0 I 1 1 4 68 000 O0 0 I I 1 ~ 68 OOO 00 0 1 I 1 4 68 000 O0 0 1 1 1 4 68 000 O0 0 I 1 1 4 68 000 O0 0 1 I I 4 68 000 OO 0 1 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ~ DATA ~ DEPT. I15¢6.000 NPHI.CNR 22.510 TN2A.CNR RCNT.CNR 2550.424 ~CmT.CNR 905.460 CNTC.CNR GR.CNR 22.719 TENS.CNR 3040.000 CCL.CNR DEPT. 11500.000 NPHI.CNR 22.427 TNPA.CNR RCNT.CNq 2657.773 2C~T.CNR 922.069 CNTC.CNR GR.CNR 20.&35 TENS.CNA 4905.000 CCL.CN~ 2.637 RTNR.CNR 2651.I19 CmTC-CNR 0.044 2.633 RTNR.CNR 2509.69Z CmTC.CNR 0.085 Z.780 942.400 Z.5T5 980.470 TAmE VERtFIC~TIDN LISTING :H'LUMSE~'GER AL~S'K,~, COMPUTING ~CENT~R DEPT. 11400.000 NPHI.CNR 213. RCNT.CN~ 2370.315 RC~T,CNR 835. GR.CNR 18.938 TENS.CNR 4840. DEPT. 11300.000 NPHI.CNR 22. RCNT. CNR 219'7. 991 RCFT. CNR 858. GR.CNR 46°688 T~NS.CNR 4740. DEPT. 11200.000 NPHI.CNR 22. RCNT.CNR 2¢72.0gB ~CFT.CNR 865. G~.CN~ 23.719 TENS.CNR 4665. DEPT. 11100'000 NPHI.CNR 44. RCNT.CN~ 13'73.170 RCFT.CNR 334. GR.CNR 51.685 TENS.CNR 4700. DEPT. 1t000.000 NPHI.CNR 19. RCNT.CN~ 2400.076 ~CFT.CNR 91~. G~.CNR ~5.344 TENS.CNR 4505. ~iEPT. 10900.000 NPHI.CNR 52. RCNT.CNR I¢??.?17 RCFT.CNR GR.CNR 1~6,375 TENS.CNR D~PT. 10800.000 NPHI.CNR RCNT.CN~ I~14.047 RCFT.CNR 286. GR.CNR 56.500 'T~NS.CNR 4~85. ~EPT. 10700.000 NPHI.CNR 55. RCNT.CNR 127~.368 RC~T.CNR 2?0. GR.CN~ 51.4~g TENS.CNR DEPT. 10600.000 NPHI.CNR 47. RCNT.CN~ 1410.975 RCFT.CNR GR.CNR 91.500 TENS.CNR 4290. DEPT. 10500.000 NPHI.CNR RCNT.CNq 148&.048 RCFT.CNR 400. GQ.CNR 68.375 TENS.CNR 4290. DE~T. 10423.500 NPHI.CNR RCNT.CNq 15~3.628 RC=T.CNR 409. GR.CNR 56.375 TENS.CNR 41~0. END O: O~T& ~ 5-NDV-1990 19:57 ~35 TNR~.CNR 723 CNTC.CNR 000 CCL.CNR 881 TNRA,.CNR 996 CNTC.CNR O00 CCL.CNR 44) TNRA.CNR ir98 CNTC.CNR 000 CCL.CNR 215 TNR~.CNR 07 ! C N T C . C N R OOO CCL. CNR 077 'TNRA.CNR $04 CNTC.CNR OOO CCL.CNR 983 TNRA.CNR 506 CNTC'CNR OOO CCL.CNR 037 TNR~.CNR 500 CNTC.CNR 000 CCL.CNR 355 TNRA.CNR 005 CNTC.CNR OOO CCL.CNR 34~ TNR~oCNR 506 CNTC.CNR O00 CCL.CN~ 262 TNR~.CNR 686 CNTC.CNR 000 CCL.CNR 195 TNR~.CNR 681 CNTC.CNR 000 CCL.CNR ~.688 2308.99b -0.O8? 2.658 2298.3~8 -0.037 2.634 2.371.431 0.04! 3.828 1387.197 -0.035 2.423 2259,167 -0.040 4.309 1389.366 0.075 4. Z O Z I O. 064 4.439 1190.505 -0.066 4.000 1387.067 -0.038 3.776 1463.2~2 -0.036 3.607 1545.426 -0.037 RTNR.CNR · C FT C. C N R RTNR.CNR CF'TC.CN~ RTNR. CNR C FT C. C NR RTNR.CNR C ~TC. CNR RTNR..CNR CFTC .CNR RTNR.CNR CFTC.CNR RTNR.CNR CFTC.CNR RTNR.CNR C~TC.CNR RTNR.CNR CFTC.CNR RTNR.CNR CFTC.CNR RTNR.CNR C~TC.CNq PAGE: 5 2.8B4 857,690 2. 845 904. 818 2.787 902.867 4.000 381.353 2. 523 953.119 4.225 333.781 4.278 306.269 5.107 25g'262 4.421 340.014 4.133 395.648 3.851 426.449 IS TAPE V~ER[FIC~TION LISTING CHLUMBE~GER ALASKA COMPUTING CENTER 5-NOV-1990 19:57 PAGE: *~-~-~, FILE TRAILER ~X~ FILE NAME : EDIT .001 SERVICE : FLZC VERSION : 00'I A06 DATE : 90/1:1/ 5 MAX R~C SIZE : 1024 FILE TYPE : LO LAST FILE : FILE NAME : EDIT .002 SERVICE : FLIC V~RS~ON : 00tA06 DAT~E : 90/11/ 5 MAX REC SIZE : 1024 FZLE TYPE : LO L~ST FILE : FILE - ED~T.OO2 .P. EXPLOR,&TION P~UDHOE BAY .S - 23 0-029-22088 "M~IN PASS LO=~ DATa FROM ,¢IELO TAPE FILE D&TA SAMPLED EVERY -.5000 FEET DAT~ INCLUDED - TOOL =XTENSION TOOL TYPE US:D NA~E CNT-A/O/H .CNL COMPENSATED N~UTRgN T~BLE TYPE : CONS TUNI CN FN WN ~PIN V~LU DEFI B.P. EXPLOR&T!ON PRUDHOE BAY S - 2] 50-029-ZZOB8 COMPANY NAME FISL9 NAME WELL N~M~ ~PI SEqI~L NURSER IS TAPE VERIFICATION LI:STIN~!] CHLUM~,ERGER A:LASK~ COMPUTING CENT':-R 5-NOV-199,0 lO:5? PAGE: 7 TUN I FL S E C T T OWN C ~UN STAT NATI WITN SON POAT EPD FT ~L MF APD ~T EK B VT ED F FT EG'L FT TOD FT B L I FT TLI FT DFT D ~= O G/C ~ V ALU !631' FNL, 4336' FEL 35 1ZE NORTH SLOPE ALASK ~ U SA P. OUNH.~M, 5. ~RSH 391597 M S L 0- 64. 6). 35. 115~2. 1 15 Z B - 7 565. BRINE 8.9 FIELD LOCATION S E C T 'I O N 'TOWNSHIP RANGE COUNTY .STATE OR PROVINCE NATION WITNESS:' N~ME SERVICE ORDER NUMBER PERMAN!ENT DATUM ELEVAT'ION O~F PERM. DATUM LO~ MEASUR!,_D FRaM ABOVE OERMANEN'T DATUM ELEVATION OF KELLY ~USHING · ELE'VATZON OF DERRICK FLOOR ELEVATI'ON OF GROUND LEVEL TO'T~L DEPTH - ORILLER BOTTOM L~G INTERVAL TOP LOG INTERVA, L DRILLING FLUID TYPE DRILLING FLUID DENSITY TABLE TYPE : CURV DEPT NPH'I TNRA RTNR RCNT RCFT CNTC C;TC Gq TENS CCL DEOTH CHANNEL NA~E NEUTRON POROSITY CALIBRATED THE~RMAL NEUTRON RATIO RAW THERMAL NEUTRON RATIO RCNT RC'~T CNTC CFTC GAMMA ~'AY TENSION CCL AMPLITUD'.E '""' D.ATA FORMAT SP:CIFICAT~" ...... SET TYPE - 64E~ ~= TYP~ REPR CODE V&LUE 1 66 0 2 66 O 3 73 44 IS TAPE VERIFI,C~TIDN LISTING CHLUMBERGER AL~SK-~ COMPUTING CENTER 5-NOV-lg90 t9:57 PAGE: TYPE REPR CODE VALUE 4 66 1 5 66 7 6:5 8 6E 0.5 9 65 FT 11 66 23, 12 68 13 66 O 14 65 FT 15 66 68 16 66 1 0 66 1 SET TYPE - CHAN ~ N&ME SERV UNIT SERVICE ~PI ~PI A~I ~Pl FILE NUMB NUMB OROE~ ~ LOG TYPE CLASS MOD NUMB S~MP ELEM DEPT FT 391597 O0 NPHI CNL PU 391597 O0 TNR~ CNL 391597 O0 RTNR CNL 391597 O0 RCNT CNL CPS 391597 OD RCFT CNL CPS 391597 O0 CNTC CNL :CPS 391597 O0 CFTC CNL CPS 391597 O0 GR CNL G~PI 391597 O0 TENS CNL L~ 391597 O0 CCL CNL V 391597 O0 SIZE 000 O0 O 2 I 1 000 O0 0 2 I 1 000 O0 0 2 1 1 000 O0 O Z 1 1 OOO O0 O 2 1 1 4 000 O0 0 2 1 1 4 000 O0 0 Z 1 1 000 O0 0 Z 1 1 4 000 O0 O 2 1 1 000 O0 0 Z 1 1 4 000 00 0 Z I 1 4 REaR CODE PROCESS CHEX) 68 68 68 68 68 5 $ 58 68 68 0000000000 0000000000 0000000000 0000000000 0000000000 O000000OO0 0000000000 O000000OO0 0000000000 0000000000 0000000000 D~PT. RCNToCNL G~.CNL D~PT. RCNToCNL GRoCNL DEPT. RCNT.CNL GR.CNL DEPT. RCNT.CNL GR.CNL 11550.500 2470.221 23.Z50 11500.000 2673.970 17.688 11400.000 !4.86.855 15.945 11300.000 2453.060 33.1~$ NPHI RC~T TENS NPHI RCFT TENS NPHI RCFT TENS NPH! RC~T TENS .CNL .CNL .CNL .CNL .CNL .CNL .CNL .CNL .CNL .CNL .CNL .CNL 19.Z87 950.35Z 3075.000 ZZ.415 959.243 4770.000 25.198 ~30.329 4580.009 19.270 974.411 4690.000 TNR~.CNL CNTC.CNL CCL.CNL TNR~.CNL CNTC.CNL CCL.CNL TNR~.CNL CNTC.CNL CCL.CNL TNq~.CNL CNTC.CNL CCL.CNL 2.437 2374.039 O.04Z 2.632 2470.~97 0.037 2.785 2357.578 -0.090 2.435 2371.8oa 0.047 RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR..CNL Cr:TC.CNL 2.568 989.123 2.8Z7 931.355 2.962 851.472 2.655 958.415 IS TAPE VERIFICATION LISTING CHLUM~E~GER ,~LASKA CgMPUTING CENTER DEPT. 11200.000 NPHI.:CNL RCNT.CNL 2435.805 RCFT.CNL GRoCNL 26.438 TENS.CNL DEPT. 11100.000 NPHI.CNL RCNT.CNL 1435.32.3 RCFT.CNL GR.CNL 64° 500 TENSoCNL 22. 841. 4460. 4 3. 373. 449 O. DEPT. 11000.000 NPHI.CNL 17. RCNT. CNL 23?9.742 RCFT.CNL 953. GR.CNL 38.344 TENS.CNL 4505. DEPT. 10900.000 NPHI.CNL 51. RCNToCNL 1500.299 ~C~T.CNL 339. GR.CNL 160.000 TENS.CNL 4~,45. DEPT. 10800.000 NpHI.CNL 58. RCNT.CNE 1347.353 RCFToCNL 272. GR,.CNL 52.188 TENS.CNL 4385. :DEPT. 10700.000 NPHI.CNL 45. RCNT.CNL 125~.257 ~C=T.CNL 298. GR.CNL 52.43~ TENS.CNL 4370. DEPT. 10600.000 NPHI.CNL 48. RCNT.CNL 1451.146 RCFT.CNL 314. GR.CNL 89.125 TENS.CNL 4245. DEPT. 10500.000 NPH!.CNL 42. RCNT.CNL 1561.914 RCFT.CNL 401. GR.CNL 59.750 TENS,CNL 4120. DEPT. 10400.000 NPHI.CNL RCNT.CNL 1632.779 RC~T.CNL GR.CNL 112.6881 TENS.CNL 35. 46T. 4105. DEPT. 10300.000 NPHI.CNL 31. RCNT.CNL 1855.031 RCFT.CNL 529. GffoCNL 49.219 TENS.CNL ~215. S-NOV-1990 19:57 DSPT. 10200.000 NpHI.CNL 34. RCNT.CNL 1521.235 RCmT.CNL 460. GR.CNE 53.156 TENS.CNL 4125. DEPT. 10100.000 NPHI.CNL 31. RCNT. CNL 1697.459 RCmT.CNL 502. GR.CNL 41.031 TENS.CNL 4020. DEPT. 1000Q.000 NPHI.CNL ~CNT.CNL 1496.728 RCFT.CNL 408. GR.CNL 52.688 TENS.CNL 4120. ~58 TNRA.CNL 387 CNTC.CNL O00 CCL.CNL 8:16 TNRAo~CNL 427 CNTC.CNL 900 CCLoCNL 272 T N ~ ~. C N k 531 CNTC.CNL 000 CCL.CNL 30.6 T N R A, C N L '729 C N T C, C NL 000 CCL. CNL 308 TNRA.CNL 183 CNTC.CNL 000 CCL.CNL 855 TNRA.CNL 727 CNTC.CNL 000 CCL.CNL 009 TNR~.CNL 841 CNTC.CNL gO0 CCL.CNL 433 TNRA.CNL 971 CNTC.CNL 000 CCL.CNL 454 TNRA.CNL 699 CNTC.CNL DO0 CCL.CNL 881 TNRA.CNL Zl~ CNTC.CNL 000 CCL.CNL ~64 TNI~A.CNL 627 CNTC. CNL 000 CCL.CNL 974 TNRA.CNL 947 CNTC.CNL go0 CCL.CNL Bt3 TNRA.CNL ~09 CNTC.CNL OOO CCL.CNL 2. ,557 2388. '875 -0.035 3.806 145 5.039 2.301 2265.712 0.04O 4.217 1417.~19 0.075 4.6 O1 130 Z. 770 - 0.037 3.973 1186.111 -0.043 4.036 1388.709 -0.032 3.730 1485.B53 0.039 3.402 1589.535 -0.031 3.151 1696.539 0.033 3.Z93 1531.906 0.037 3.157 1553.680 -0.042 3.696 1427.345 -O.03Z RTNR.CNL C. FTCoCNL RTNR.CNL CFTC,C.NL RTNR.CNL CFTC.CNL RT NR. C NL CF'TC,CNL RTN~oCNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR .CNL CFTC .CNL R'TNR.CNL CmTC.rNL, ,~ RTN~.CNL CmTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL C,c:TC.CNL RTNR.CNL CFTC.CNL PASE: 2. 914.627 4.098 402.252 2.305 975.888 4.595 337.399 4.800 294.325 4.189 291.335 4.410 359.730 3.955 402'687 3.475 496.283 3.2B3 571.922 3.679 473.551 3.473 497.154 3.930 417.108 IS TAmE VERIFICATION LISTING CHLUMi3ERGER ALASK~ :OMPUTING CENT'ER DEPT. RCNT.CNL GR.CNL DEPT. RCNT.CNL GR.CNL RCNT.CNL GR.CNL DEPT. RCNT.CNL GR.CNL DEPT. RCNT.CNL GR.CNL 9900.000 NPHI.CNL 1361.879 qCFT.CNL 53.125 TENS.CNL 9800o!000 NPHI.CNL 1286-386 RCFT.CNL 73.000 TENS.CNL 9700.000 NPHI.CNL 1378.435 RCFT.CNL 55. 063 TENS.iCNL 9600.000 NPHI..CNL 1514.156 RCFT.CNL 52.594 TENS.CNL 9500.000 NPHI.CNL 1212.513 RCF'T.CNL 59.000 TENS.CNL DEPT. 9400.000 NPHI.CNL RCNT.CNL 1279.315 ~C~T.CNL GR.CNL 48.625 TENS.CNL DEPT. RCNT.CNL GR.CNL DEPT. RCNT.CNL GR.CNL DEPT. RCNT.CNL GR.CNL DEPT. RCNT. CNL GR .CNL DEPT. RCNT.CNL GR.CNL DEPT. RCNT.CNL GR.CNL DEPT. RCNT.CNL G~.CNL 9300.000 NPHI.CNL ~Z87.876 RCFT.CNL 182.750 TENS.CNL 9ZO0. O00 NPHI.CNL 1209.912 RC~T.CNL 98.313 'TENS. CNL 9100.000 NPHI.CNL 1359.716 ~CFT.CNL ~1.313 TENS.CNL 9000.000 NPHI.CNL 133Z.852 RC~T.CNL 313.500 TENS.CNL 3900.000 NPHI.CNL 1298.750 ~CFT.CNL 53.719 TENS.CNL ~800.000 NPHi. CNL 1314.464 RCFT.CNL 56.188 TENS.CNL · B700.O00 NPHI.CNL 1334.735 RCFT.CNL 56.563 TENS.CNL 5-NOV-1990 19:57 54.257 TN~A.CNL 303.ZB6 CNTC.CNL 3970.000 CCL.CNL 49.726 TNRA.CNL 332. 621 CNTC.CNL 3915.000 CCL.CNL 38.~70 TNRA.CNL 366 . 465 C N T ~C. C N L 3925.000 CCL.CNL 31.544 TNRA.CNL 418.251 CNTC.CNL 3845.000 CC~L.CNL 54.038 TNRA.CNL 275.325 CNTC.CNL 3830.000 CCL.CNL 4'7.961 'TNRA.CNL 321.35¢ CNTC.CNL 3820.000 CCL.CNL 50.964 TNRA.CN!L 266.736 CNTC.CNL 3810.000 CCL.CNL 49.538 ~TNRA.CNL 293.~95 CNTC.CNL ~805.000 CCL.CNL 51.733 TN~.CNL 289.859 CNTC.CNL 3~45.900 CCL.CNL 45.204 TNRA.CNL 3Z1.354 CNTC.CNL 3790.000 CCL.CNL 49.722 TNRa. CNL 290.16~ CNTC.CNL 3,800.009 CCL.CNL 43.883 TNqA.CNL 312.145 CNTC.CNL 3395.000 CCL.CNL 50.780 TNR~.CNL 30Z.93~ CNTC.CNL 3!25.000 CCL.CNL 4.. 379 129 1.56,4 -0.030 A.130 1268.205 -0.033 3.535 130 ?. 523 O. 03,~ 3.1~3 1401.449 0.062 4.367 1223.766 -0.056 4.033 1288.000 0.051 4.198 1203.531 -0.044 4.120 1254.592 -0.038 4.Z40 1284.134 -0.053 3.882 1255.434 0.048 4.130 1254.021 0.066 3.810 1274.094 0.061 4.188 1Z66.875 0.044 RTNR.CNL CmTC.CNL RTNR.C'NL CFTC.CNL RTN2.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL R'TNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CmTC.CNL RTNRoCNL C~TC.CNL RTNR.CNL CFTC.CNL PAGE: 10 4.6'76 303.565 4.706 311.459 3.950 360.021 3.151 441.379 4.545 293.881 4.382 318.423 4.516 273.545 4.412 308. 834 4.452 307.548 4.387 319.997 4.147 304.811 4.118 334.455 4.581 309.373 TAPE VERIFIC&TION LISTING fLUMBERGER ALASKA COMPUTING CENTER' DEPT. ~B60 O. 000 NPHI.CNL RCNT.CNL 1277.030 RCFToCNL GR.CNL 61.313 TENS.CNL DEPT. 8500.00'0 NPHI-~CNL RCNT.CNL 1289o370 RCFT.CNL G~,.CNL 513.531 TENS..CNE OEPT. 8400.000 NP~qI.CNL RCN'T.CNL 1239.621 RCFT.CNL GR.CNL 55.250 TENS.CNL DEPT. 8300.000 NPHI.CNL RCNT.CNL 1309'649 RCFT.CNL GR.CNL ,~1.5Z5 TENS.CNL DEPT. 8200.000 NPHI.CNL RCNT.CNL 1394. 246 RCFT.CNL GR.CNL 51.Z50 TENS.CNL DEPT. 8100.000 NPHI.CNL RCNT.CNL 1250-417 RCFT.CNL GR.CNL 94.935 TENS.CNL DEPT. 8000. 000 NPHI.CNL RCNT.CN~L 1513.137 qCFT.CNL GR.CNL 64.750 TENS.CNL DEPT. 7900.000 NPHI.CNL RCNT.CNL 1253.319 RCFT.CN'L GR.CNL 150.~:75 TENS.CNL DEPT. 7800.000 NPHI.CNL RCNT.CNL 1449.028 eCmT.CNL G~.CNL 61.625 TENS.CNL DEPT. 7700.000 NPHI.CNL RCNT.CNL 1345.670 RCCT.CNL GR.CNL 278.750 TENS.CNL DEPT. 7600.000 NPHI.CNL RCNT.CNL !420.120 RCFT.CNL GR.CNL 58.406 TENS.CNL DEPT. 7550.500 NPHI.CNL RCNT.CNL '1~3~.550 RC:T.CNL GR.CNL 67.053 TENS.CNL END g~ DATA 5--NOV-1990 1~:57 51.552 TNRA.CNL 281.310 CNTC.CNL 379'0.000 C'CL.CNL 51.Z94 'TNRA.'CNL 257.51.5 CNTC.CNL 3800.00'0 CCL.CNL ~8.307 TNRA.CNL 321.72~ CNTC.CNL 3 '? 05 . 000 C C L . C N L 49.240 TNRA.CNL 322.465 CNTC.CNL ~700 gOO CCL.CNL 51.716 TNRA.CNL 294.070 CNTC.CNL 3655.000 CCL.CNL 42.477 'TN~.CNL 331.325 CN'TC.CNL 3570.0'00 CCL.CNL 31.712 TNRA'CNL 41,4.965 CN'TC.CNL 3520.000 CC:L.CNL 50.266 TNR~.CNL 288.539 CNTC.CNL 3565.000 CCL.CNL 44.937 TNRA.CNL 340.55 9 CNTC.CNL 3530.000 CCL.CNL 49.220 TNRA.CNL ~28. 577 CNTC.CNL 3475. gO0 CCL.CNL 38.580 TNRA.CNL 395.909 CNTC.CNL 3370.000 CCL.CNL 39.515 TNRA.CNL 379.014 CNTC.CNL 3~95.000 CCL.CNL 1256.83!0 -0.035 4. Z16 1225.764 -0.069 1217.159 -0.077 4.104 1243.970 -0.03.3 4.Z39 1336.892 O. 043 3.733 1200.300 0.038 3.142 1428.215 0.043 4.160 1230.33:5 -O.O4Z 3.365 138~.963 0.045 4.103 1295.779 -0.035 3.519 1402.361 -0.043 3.570 1352.37.3 -0.066 RTNR .CNL C ~ T C. 'C N L RTNR.CNL CFTC.CNL RTNR. CNL CFT C. CNL RT NR. C NL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL RTNR.CNL C~TC .CNL RTNR.CNL CFTC.CNL RTNR.CNL CFTC.CNL 4.548 298.3:30 3,. 943 Z"93. 744 4.200 317.171 4.452 316.512 4.382 319.358 4.219 319 · 003 3.245 447.570 4.545 327.108 3.753 373.819 4.484 321. 729 3.641 407.942 4.132 3;34.253 IS 'T6~PE VERIFICATION LISTING 'HLUMSERGER ALA. SK~ COMPUTING CENTER **** FILE TRAILER FILE NAME : EDIT SERVICE : FLIC VERSION : DATE : 90/11/ MAX REC SIZE = 1024 FILE TYPE : LD LAST FILE : 5-NDV-1990 19:57 **** TAPE TRAILER **~ SERVICE NA,~.E : EDI'T DATE : ~0/1I.t 5 ORIGIN : FLIC TAPE NAME : 74128 CONTINUATION ~ : I PREVIOUS TSPE : COMMENT : 5.P. EXPLOR~.TIDN,PRUDH~E B,~Y,.S- 23,50-029-22088 ~*~ REEL TR.~ILER SEP. VICE NAME : EDIT D.~TE : 90/11/ 5 ORIGIN : FL[C REEL NAME : 74128 CQNTINU~TIDN PREVIOUS ~EEL : COMMENT : ~.~. EXPL~R~TION,PRUOH~]E ~Y,.S - 23~50-029-22088 12