Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout190-1277. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU S-23
Weld Starting Head, Install POGLM
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
190-127
50-029-22088-00-00
11634
Conductor
Surface
Intermediate
Production
Liner
9224
80
2669
10899
932
11582
20"
13-3/8"
9-5/8"
7"
9188
34 - 113
33 - 2702
29 - 10928
10692 - 11624
34 - 113
33 - 2702
29 - 8732
8567 - 9217
Unknown, 11582
2260
4760
7020
None
5020
6870
8160
10949 - 11408
4-1/2" 12.6# L-80 27 - 10714
8746 - 9067
Structural
4-1/2" Baker F-1 Packer
10625
8522
Torin Roschinger
Operations Manager
Hunter Gates
hunter.gates@hilcorp.com
907-777-8326
PRUDHOE BAY, Prudhoe Oil
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028257, 0028258
27 - 8583
N/A
N/A
93
413
89
234
93
91
700
1800
320
320
324-474
13b. Pools active after work:Prudhoe Oil
No SSSV Installed
10625, 8522
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 8:55 am, Sep 30, 2025
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2025.09.30 07:57:57 -
08'00'
Torin Roschinger
(4662)
J.Lau 11/6/25
RBDMS JSB 100225
ACTIVITY DATE SUMMARY
10/4/2024
T/I/O = 610/652/1 Temp = SI. CMIT-TxIA FAILED to 2750 psi. LLR to small to
register with pump. (PATCH TUBING / LINER) Pumped 37 bbls Crude into TBG/IA
to reach 2753/2750. 1st 15-minute loss of 111/117 psi, 2nd 15-minute loss of 65/66
psi, for a total loss of 176/183 psi in 30 minutes. Multiple attempts made to perform
CMIT-TxIA which all failed. On 4th attempt lost 60/64 in 15 mins, lost 50/51 psi in 30
mins, lost 46/48 in 45 mins and lost 44/47 in 60 mins for a total loss of 200/210 psi in
60 mins. See log for details. Bled WHPs to 493/285 psi. Monitor. Gained 174/260 in
30 min monitor. FWHPs = 667/545/2 Valve Positions: SV/WV/SSV/AL= Closed, MV=
Open, IA/OA= OTG
11/20/2024
***WELL S/I ON ARRIVAL***
STBY FOR HIGH WINDS
***CONT ON WEATHER TICKET***
11/21/2024
T/I/O=920/700/0 Temp=S/I (Assist SL with load and test CMIT-TxI) Pumped 10 bbls
of crude down the TBG for load. Pumped a further 16 bbls of Crude down the TBG
for Testing. CMIT-TxI *******Failed****** Pumped 9 bbls of Crude down the TBG/IA to
reach a max applied psi of 2750. 1st 15 min TBG/IA lost 50/40, 2nd 15 min TBG/IA
lost 50/10 psi for a total loss of 100/50 psi in a 30 min test. *****WSR continued on
11-22-2024*****
11/21/2024
***WELL S/I ON ARRIVAL***
PULLED P-PRONG FROM 4-1/2" PX PLUG BODY @ 10681' MD
PULLED 4-1/2" PX PLUG BODY FROM X-NIP @ 10681' MD
BRUSHED 4-1/2" XN NIP @ 10702' MD
SET 4-1/2'' x 2-3/8'' XN-NIP REDUCER @ 10702' MD
RAN 4-1/2'' CHECKSET O XN-NIP REDUCER @ 10702' MD (Good)
SET 1.875'' XN PLUG IN XN-NIP REDUCER @ 10702' MD
PERFORM C-MIT (FAIL)
***WSR CONT. ON 11/22/2024***
11/22/2024
******WSR continued from 11-21-2024******* (TFS unit 1 assist S-Line with load and
test CMIT-TxIA) CMIT-TxIA **********PASSED********** @ 2750 psi. Pumped 9 bbls
of Crude down the TBG/IA to to reach a max applied psi of 2750 psi. 1st 15 min
TBG/IA lost 50/50 psi, 2nd 15 min TBG/IA lost 25/0 psi for a total loss of 75/50 psi in
a 30 min test. Bled TBG/IA down to 900 psi. Well left in S-Line control.
Final WHPS 1100/850/0
Daily Report of Well Operations
PBU S-23
Daily Report of Well Operations
PBU S-23
11/22/2024
***WSR CONT. FROM 11/21/2024***
T-BIRD PERFORMED PASSING CMIT-TxIA (see t-bird log)
SET 4-1/2" WHIDDON CATCHER SUB ON 4-1/2" x 2-7/8" XN NIP REDUCER @
10702' MD
PULLED RA-DGLV FROM ST #1 @ 10589' MD
PULLED RM-DGLV FROM ST #3 @ 8397' MD
PULLED RM-DGLV FROM ST #5 @ 3165' MD
SET RM-LGLV (16/64" ports, tro 1641 psi) IN ST #5 @ 3165' MD
SET RM-LGLV (16/64" ports, tro 1613 psi) IN ST #3 @ 8397' MD
SET RM-OGLV (24/64" orifice) IN ST #1 @ 10589' MD
PULLED RM-EXT PKG DGLV FROM ST #4 @ 5919' MD (left as open pocket for
poglm)
PULLED 4-1/2" WHIDDON CATCHER SUB FROM TOP OF 4-1/2" x 2-7/8" XN NIP
REDUCER @ 10702' MD (empty)
***WELL LEFT S/I ON DEPARTURE***
12/7/2024
T/I/O = 720/330/VAC. Temp = SI. Displacing tubing, IA & OA w/ N2 (weld). ALP =
350 psi, SI @ CV. Strap conductor @ 7',3", no fluid. OA FL @ ~24'. Pressure OAP
to 50 psi w/ N2. Leave N2 cap for 20 min. Bled OAP to BT to 5 psi in < 5 min. T &
IA FL near surface. Bled TP & IAP slowly to BT to 650/150 psi in 2hr, 30 min.
(gas/energized fluid, 5.66 bbls). U-Tube TxIA for 30 min. Equalized @ 570 psi. Bled
TP & IAP slowly to BT to 300 psi in 2 hrs (gas/energized fluid, 0.5 bbls). Total BBLs =
6.1. Monitored for 30 min. TP increased 30 psi & T FL @ 210'. IAP increased 10 psi
& IA FL @ 350'. Final WHPs = 330/310/5
SV, WV, SSV = C. MV = O. IA, OA = OTG. 19:30.
12/15/2024
T/I/O = 560/390/0+. Temp = SI. T/IA/OA FL (pre weld). ALP = 0 psi, SI @ CV. T FL
@ 560' (1550' above SSSV Nip, 8.5 bbls). IA FL @ 250' (2915' above sta # 5 Dome,
13.4 bbls). OA FL @ 24'.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 11:30
1/9/2025
T/I/O = 580/420/3. Temp = SI. Bleed TP & IAP (pre load). ALP = 500 psi, SI @ CV.
Temporary containment installed in cellar. T FL @ 590' (9 bbls). IA FL @ 260' (14
bbls). OA FL @ 70' (5 bbls). Bled ALP to 0 psi in 0 psi in 1.5 hrs. Bled IAP to 0 psi
in 1.5 hrs (gas). Bled TP to 450 psi in 3 hrs (gas/energized fluid). Unable to bleed
lower. IAP increased 10 psi. Monitored for 30 min. TP increased 60 psi, IAP
increased 10 psi. Final WHPs = 510/20/3.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 05;00
1/9/2025
T/I/O= Load Tbg, IA, & OA with Diesel ( Pre Weld ) TxIA Comminication. Pumped
48 bbls diesel down TBG Bleed pressure off of TBG/IA both Fluid Packed. Pumped
3.6 bbls diesel down OA bleed OA down fluid packed. Secured well FWHP=90/90/8
***Job Continued 1-10-25***
1/10/2025
T/280/280/30. Temp = SI. Rock out diesel from T/IA/OA (pre weld). AL
disconnected. Flooring removed, replaced with plywood over cellar. OA casing
valves removed, integrols installed at 3:00 & 9:00. T FL @ surface. IA FL @ surface.
Bled TP & IAP to BT to 50 psi, begin pushing N2 down tbg, taking fluid out IA,
returning 7.2 bbls. U-tube TxIA for 30 minutes. Equalized @ 130 psi. T FL @ 70'. IA
FL @ 40'. OA FL inconclusive ( unable to strap due to grease in OA). TP & IAP
increased 60 psi throughout duration of job. Final WHPs = 190/190/0
SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30
Daily Report of Well Operations
PBU S-23
1/10/2025 ***Job Continued from 1-9-25*** Rig Down
1/11/2025
T/I/O = SSV/290/0 Prep for Weld Repair
Assist DHD and Worley welders with prep and RU Miller Pro Heat. OA fluid level is
not low enough for pre-heat and welding. DHD unable to get hose down past
possible grease plug. Plan to have full bore flush OA. Secure well and close out
permits.
1/11/2025
T/I/O = SSV/290/0+. Temp = SI. Purge OA for weld. AL disconnected. Flooring
removed, replaced with plywood over cellar. OA casing valves removed, integrals
installed. Purged ~0.75 gals of fluid from OA. Strapped OA at ~16" (1" below lowest
future weld, need 12"). Held up by apparent grease bridge. Hot oil ordered to flush
grease out. Final WHPs = SSV/290/0
SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30
1/11/2025
T/I/O=287/293/9 ( PATCH TBG / LINER ) Artic Pack Flush. Pressured up OA and
bleed off multiple times see Log for details. *** Job Continued 1-12-25 ***
1/12/2025
T/I/O = 290/290/10 Prep for Weld Repair
Assist DHD and Worley welders to prep for weld and RU Miller Pro Heat. OA fluid
level evacuated to 3' below bottom weld area. Bleed IC-PO and tubing hanger test
voids and blow them out with air to remove as much hyd fluid as possible. Miller pro
heat wrapped and tested good in preparation for pre-heat to 550 deg F and weld
repair tomorrow morning.
1/12/2025
T/I/O = 290/290/10. Temp = SI. Valve grease OA flush, purge OA for weld. AL
disconnected. Flooring removed, replaced with plywood over cellar. OA casing
valves removed, integral & 2" hardline installed. LRS purged diesel through OA to AP
tank. Pressured OA in intervals dumping pressure each time from 100 psi to 500 psi.
Bled OAP to 0 psi. Purged fluid from OA to ~3' bleow lowest weld. Purged OA with
N2 & held N2 sweep while welders tack weld heat pad into place (5 bottles used, 11
full) . Job prepped for welding to commence in the morning.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00
1/12/2025
*** Job Continued from 1-11-25 *** ( PATCH TUBING / LINER ) Rig Down Secure
well FWHP=289/298/450.
1/13/2025
T/I/O = 290/290/35 Weld Repair
Assist DHD and Worley welders, begin pre-heat, temps at 550 for 1 hour and then
Miller Pro Heat control unit had electrical issue, shut down MPH, standby for second
control unit to be delivered and swapped and pre-heat started again. Temp at 550 for
1.5 hours, temps dropped to 450, thermal expansion brought OA fluid level back up
to surface. Shut down pre-heat. Discussion with town, release Worley welders, DHD
monitor OA with open bleed, standby for OA fluid level to be lowered.
1/13/2025
T/I/O = 290/290/0+. Temp = SI. Purge OA for weld (weld). AL disconnected.
Flooring removed, replaced with plywood over cellar. OA casing valves removed,
integral & 2" hardline installed. Began N2 sweep, welders began preheating starting
head. Starting head reached 550° then fell 100°. Fluid to surface due to thermal
expansion, welders shut down heating. Held open bleed for ~1 hr. OA went on VAC
as well cooled down. Shut in N2 bleed. Disconnected heater and open doors to cool
wellhead.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30
Daily Report of Well Operations
PBU S-23
1/14/2025
T/I/O = 290/290/0+. Temp = SI. Purge OA for weld (weld). AL disconnected.
Flooring removed, replaced with plywood over cellar. OA casing valves removed,
integral & 2" hardline installed. Strapped OA fluid @ ~1' from lowest weld. Purged
~5 gallons of fluid from OA. OA strapped @ ~4' from lowest weld, tagged solid,
unable to get deeper.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00
1/16/2025
T/I/O = 290/290/0+. Temp = SI. Purge OA for weld (weld). AL disconnected.
Flooring removed, replaced with plywood over cellar. OA casing valves removed,
integral & 2" hardline installed. Attempted to sweep fluid from OA w/ N2, no fluid
evacuated after multiple attempts. OA strapped @ ~4' from lowest weld, tagged
solid, unable to get deeper. Job prepped for braiden head heating in the morning.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:00
1/17/2025
T/I/O = 300/300/10 Purge OA w/N2 (assist welders). Welders heating WH to 550 °
F. Holding constant flow of N2 through OA to OT until WH cools to below 185°. Left
a 10 psi cap of N2 on OA upon departure. Final WHPs = 300/300/10.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 18:00
1/18/2025
T/I/O = 300/300/10 Purge OA w/N2 (assist welders). Welders heating WH to 550 ° F
and welded uper and lower collar on Braden head. Held constant flow of N2 through
OA to OT until WH cools to below 185°. Left a 10 psi cap of N2 on OA upon
departure. Final WHPs = 300/300/10.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00
1/18/2025
T/I/O = 300/300/0
Weld Casing head to 13-3/8 casing - Weld 13-3/8 casing pup to collar.
Pre & post heat with Miller pro heat induction heater.
Final WHP's 300/300/0
1/19/2025
T/I/O = SSV/310/0+. Temp =SI. MIT-OA to 1200 psi w/N2 **PASS**. AL
disconnected. Flooring removed, replaced with plywood over cellar. OA casing
valves removed, integral & 2" hardline installed. Performed MIT-OA w/ N2 to 1200
psi, lost 38 psi in 1st 15 min, lost 16 psi in 2nd 15 min for a PASS. Bled OAP to 0 psi.
IAP decreased 10 psi. Left heater in wellhouse, backdoor left chained open. Final
WHPs = SSV/300/0+.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 11:00
1/19/2025
T/I/O = 300/300/0
MPI weld repair (pass) - Rig down miller pro heat machine.
Final WHP's T/I/O = 300/300/0
1/20/2025
Installed OA and OA companion blind, VR Profiles full of cement (Could not install VR
plugs), Torqued flanges to API Spec.
2/1/2025
***WELL SI ON ARRIVAL*** (SET LOWER POGLM PACKER)
INITIAL T/I/O: 300/300/0 PT 300/2500PSI LOG CORRELATED TO 4.5" TUBING
TALLY
RUN NS 450-368 MONO-PAK L-80 LOWER POGLM PACKER. ME SET DEPTH:
5950' CCL STOP: 5940.7' CCL-ME: 9.3'
***JOB COMPLETE***
Daily Report of Well Operations
PBU S-23
2/5/2025
(Assist Slickline) TFS U4, Assist with MIT-T on patch and gas lift mandrel, Initial
WHP T/IA/OA= 400/300/0, Target for MIT-T 2500 psi with MAP of 2750, pumped
crude down tubing took 4 bbls to reach MAP of 2750, First 15 minutes TBG lost 270
psi, Second 15 TBG lost 280 psi and IA came up 25 psi, Pressured back up to MAP
of 2750 for second MIT-T, Took 1 bbls crude to reach MAP of 2750, First 15 TBG lost
150 psi, Second 15 TBG lost 300 psi while IA stayed at 350 psi for duration of test,
bled pressure off for SL to go in hole, **** Job postponed due to weather****
2/5/2025
***WELL S/I ON ARRIVAL***
SET 450-368 NS MONO-PAK UPPER POGLM STRADDLE PACKER@ 5914' MD to
mid element (2-3/8" spacer pipe & gaslift mandrel w/ bk-dglv installed, id=1.905",
36.60' lih) IN LOWER ANCHOR @ 5,950' MD
THUNDERBIRD PERFORMED 2 FAILING MIT-T'S TO 2,500 PSI
LAY DOWN EQUIPMENT (phase weather coming)
***POLLARD 59 ON WEATHER HOLD (high winds)***
2/6/2025
***OFF WEATHER HOLD, BACK ON WSR FOR S-23 FROM 2-5-25***
T-BIRD ATTEMPTED MIT-T TO 2500 psi w/ MAX APPLIED TO 2750 psi (fail see t-
bird log)
T-BIRD ATTEMPTED CMIT TO 2,500 PSI (fail)
RE-ATTEMPTED MIT-T W/ SAME RESULTS
2 ATTEMPTS TO PULL 2-3/8" XXN PLUG FROM 10,702' MD
MADE 2 x 1-3/4" PUMP BAILER TO PLUG @ 10,702' MD (recovered ~2 cups of
hard packed frac sand)
SET 4-1/2" CAT w/ 3" SEALS IN TOP OF 450-368 POGLM STRADDLE @ 5917'
SLM
T-BIRD ATTEMPTED MIT-T TO 2500 AGAINST CAT (pass, see t-bird log)
PULL 4-1/2" CAT FROM TOP OF 450-368 POGLM STRADDLE @ 5917' SLM
T-BIRD ATTEMPTED MIT-T TO 2500 (fail)
***WSR CONTINUED ON 2-7-25***
2/6/2025
T/I/O=269/300/0 (Assist Slickline W/pressure test) TFS U4. Pumped 2.6 bbls of crude
down the TBG to attempt a pressure test @ 2750 psi MAP. Reached test pressure @
2748 psi TBG, 348 psi IA. First 15 minutes TBG lost 341 psi, IA lost 2 psi. Second 15
mintutes TBG lost 263 psi, IA lost 0 psi. Hooked up jumper hose to IA and equalized
pressure from TBG to IA. Pumped 13 bbls of crude down the TBG and IA to Pressure
test both strings for a CMIT-TxIA. Reached test pressure @ 2696 psi TBG, 2742 psi
IA. First 15 minutes TBG lost 83 psi, IA lost 82 psi. Second 15 minutes TBG lost 69
psi, IA lost 73 psi ***CMIT-TxIA FAILED***. Pumped 1 bbl of crude down the TBG for
second test against TBG only. Reached test pressure @ 2742 psi TBG, 472 IA. First
15 minutes TBG lost 409 psi, IA gained 25 psi. Second 15 TBG lost 303 psi, IA
gained 16 psi. Pumped 1.7 bbls of crude down the TBG for a pressure test against
CSV set by slickline. Reached test pressure @ 2750 psi TBG, 337 psi IA. First 15
minutes TBG lost 93 psi, IA lost 8 psi. Second 15 minutes TBG lost 28 psi, IA lost 8
psi, Test passed. Bled back 1.7 bbls for Slickline to pull CSV. Pumped 3 bbls of crude
down the TBG to test after pulling CSV. Reached test pressure @ 2746 psi TBG, 350
psi IA. First 15 minutes TBG lost 343 psi, IA gained 23 psi. Second 15 minutes TBG
lost 273 psi, IA gained 6 psi *Job continues to 2-7-25*
Daily Report of Well Operations
PBU S-23
2/7/2025
*Job continues from 2-6-25* (Assist Slickline, MIT-T) TFS U4. Pumped 16 bbls of
crude down the TBG to flush and assist SL in settings plug. Pumped 4 bbls of crude
down the TBG to pressure up for an MIT-T MAP @ 2750 psi. Reached test pressure
at 2741 psi TBG and 336 psi IA. First 15 minutes TBG lost 180 psi, IA gained 19 psi.
Second 15 minutes TBG lost 106 psi, IA gained 12 psi. ***MIT-T FAILED***.
Established LLR @ .023 BPM @ 2750 psi. Attempted to Bleed down TBG to 0 psi.
Unable to achieve lower than 264 psi. Took back 32 bbls. Pumped 14 bbls of crude
down the TBG to attempt another MIT-T MAP @ 2750 psi. Reached test pressure at
2750 psi TBG, 91 PSI IA. First 15 minutes TBG lost 161 psi, IA gained 5 PSI. Second
15 minutes TBG lost 110 psi, IA gained 4 PSI. ***MIT-T FAILED***. Continued
watching pressure for another 30 minutes with average losses of ~100 psi. Bled back
3 bbls to bring TBG to 800 psi. Well left in control of slickline upon departure. Tags
hung on IA and master for tests
FWHPS=804/110/0 IA/OA=OTG SV/WV/SSV=C MV=O
2/7/2025
***WSR CONTINUED FROM 2-6-25***
RAN KJ, 1-3/4" P. BAILER (msfb). S/D @ 10714' SLM (recovered ~1 cup of hard
packed frac sand, metal marks on blr bottom)
MADE ATTEMPT TO EQ/PULL 1.875" XXN PLUG FROM 10702' MD
RAN 1.75" HYDROSTATIC BAILER TO 10,714' SLM, RECOVERED ~1-1/2 CUPS
OF HARD PACKED CARBOLITE
PULLED 1.875" XXN PLUG FROM 10,702' MD, PLUG PACKED OFF W/ FRAC
SAND, PACKING & O-RINGS LOOK GOOD
SET 1.875" XXN PLUG (on seat, 14" fill ext, 36" lih, 4 x 3/16" ports) IN NIPPLE
REDUCER @ 10,702' MD
T-BIRD PERFORMED A FAILING MIT-T TO 2,500 PSI
T-BIRD BLED BACK TBG & ATTEMPTED MIT-T TO 2500 (fail)
***WSR CONT ON 2-8-25***
2/8/2025
***WSR CONTINUED FROM 2-7-25***
RIG DOWN POL 59
***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS***
2/20/2025
T/I/O = SSV/340/5. Temp = SI. Bleed IAP (pre E-Line LDL). ALP = 0 psi, AL SI @
CV. IA FL @ 120' (6.5 bbls). Bled IAP to BT (gas) from 340 psi to 90 psi in 30 min.
SI bleed, fluid @ surface. Monitor for 30 min. IAP increased 30 psi. FWHPs =
SSV/120/5
SV/WV/SSV = C. MV = O. IA, OA = OTG. 13:00
2/21/2025
***WELL S/I ON ARRIVAL*** ( LEAK DETECTION LOG IN PROGRESS)
RIG UP YJ ELINE.
PT PCE 300 PSI LOW /3000 PSI HIGH
RIH TO LOG BASE LINE, SAT DOWN UNABLE TO GET THROUGH POGLM TAG
AT 5940' MD,
RIG DOWN
***WELL S/I ON DEPARTURE***
2/21/2025
T/I/O= 531/130/1. LRS 72 Assist E-Line with LDL (PATCH TUBING / LINER). E/L
could not get down the TBG so job cancelled.
Daily Report of Well Operations
PBU S-23
4/16/2025
***WELL S/I ON ARRIVAL***
RAN 2 3/8" BRUSH AND 1.75" SAMPLE BAILER. S/D IN POGLM @ 5928' SLM.
BRUSH POGLM UNTIL NO LONGER SITTING DOWN.
RAN 10' x 1.875" STEM W/ 1.5" BULLNOSE. DRIFT CLEANLY THROUGH POGLM
TO TAG PLUG @ 10,702' MD.
RAN HES 24 ARM CALIPER FROM 10,710' SLM TO SURFACE, GOOD DATA
***WELL S/I ON DEPARTURE***
6/27/2025
***WELL S/I ON ARRIVAL***
DRIFTED W/ 20' x 1.75" BAILER. NO ISSUES THROUGH POGLM @ 5,914' MD.
CONTINUED DRIFT TO NIPPLE REDUCER & PLUG @ 10,702' MD W/ NO ISSUE
***WELL LEFT S/I ON DEPARTURE***
7/2/2025
T/I/O= 752/365/3 (PATCH TUBING/LINER) Assist E-Line. Pumped 6.1 bbls diesel
into TBG to pressure to 2500 psi. Monitored pressure for 5 min intervals and
calculated LLR 0.84 gpm/ 0.02 bpm. Pumped 9.6 bbls diesel holding 2500 psi on
TBG.
7/2/2025
***WELL SI ON ARRIVAL*** (LDL)
MIRU YELLOWJACKET E-LINE
PT PCE 300PSI LOW, 3000PSI HIGH. FUNCTION TEST WLVS
RIH WITH READ ARCHER ACOUSTIC LDL TOOLSTRING AND CORRELATE TO
WELL SCAMATIC
LOG BASELINE PASS TO 10697', INITIATE LEAK, T/I/O 760/365/0
LEAK FOUND AT 10629' IN THE PACKER
RDMO YELLOWJACKET E-LINE
*** WELL SI ON DEPARTURE*** JOB COMPLETE
9/4/2025
T/I/O=703/350/0 Job Objective: Confirm IA stabilization. Verify IA was Fluid packed,
Bled IA from 350 psi to 283 psi went to fluid. Pumped 2.9 bbls down tubing to
pressure up to 2750 and maintained tubing pressure between 2500- 2750 with 0.9 bbl
total over the 3.5-hour test. IA increased to 356 psi and slowly climbed to ~420 where
it remained stable for 2.5 hours. Bled tbg to staring pressure. FWHP=705/348/2 Well
secured, DSO notified upon departure.
9/21/2025
*** WELL S/I ON ARRIVAL ***
BAIL FORMATION SAND FROM TOP OF PLUG @ 10,702 MD.
JOB IN PROGRESS
**** WSR CONT ON 09/22/25 ****
9/22/2025
**** WSR CONT FROM 9/21/2025 ****
**** WELL CONTROL DRILL W/ WSL ****
RAN 2 3/8" DOGLESS GS TO 1.875" XN PLUG IN NR @ 10,702' MD (sheared).
PULLED 1.875" XN PLUG FROM NR @ 10,702' MD (1/2 cup sand/carbolite in fill
extension).
*** JOB COMPLETE, WELL S/I ON DEPARTURE ***
7. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field:
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in this pool?
Will perfs require a spacing exception due to property boundaries?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStratigraphicExploratory
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
AOGCC USE ONLY
Commission Representative:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other Conditions of Approval:
Post Initial Injection MIT Req'd?Yes No
Subsequent Form Required:
Approved By:Date:
APPROVED BY
THE AOGCCCOMMISSIONER
PBU S-23
Weld Starting Head
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK
99503
190-127
50-029-22088-00-00
341J
ADL0028257, 0028258
11634
Conductor
Surface
Intermediate
Production
Liner
9224
80
2669
10899
932
10681
20"
13-3/8"
9-5/8"
7"
8560
34 - 113
33 - 2702
29 - 10928
10692 - 11624
2375
34 - 113
33 - 2702
29 - 8732
8567 - 9217
Unknown, 11582
2260
4760
7020
10681
5020
6870
8160
10949 - 11408 4-1/2" 12.6# L-80 27 - 107148746 - 9067
Structural
4-1/2" Baker F-1 Packer
No SSSV Installed
10625, 8522
Date:
Torin Roschinger
Operations Manager
Alex Vaughan
alex.vaughan@hilcorp.com
907-564-5258
PRUDHOE BAY
9/1/2024
Current Pools:
PRUDHOE OIL
Proposed Pools:
PRUDHOE OIL
Suspension Expiration Date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 8:41 am, Aug 19, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.08.16 21:15:44 -
08'00'
Torin
Roschinger
(4662)
324-474
SFD 8/19/2024 DSR-8/21/24
10-404
MGR12SEP24*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2024.09.13 21:04:11
-04'00'09/13/24
RBDMS JSB 091724
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
Well Name:S-23 Permit to Drill:190-127
Current Status:Not Operable, PAL API Number:50-029-22088-00
Estimated Start Date:September 1st 2024 Estimated Duration:10 days
Regulatory Contact:Abbie Barker Revision:0
First Call Engineer:Alex Vaughan (907) 564-5258 (O)(907) 748-5478 (M)
Current Bottom Hole Pressure:3250 psi (average Ivishak) 7.14 ppg | PPFG at top perf
Max Anticipated Surface Pressure:2,375 psi (Based on 0.1 psi/ft gas gradient)
Last SI WHP:1500 psi Sep 7
th, 2021
Min ID:3.725” @ 10,702’ MD XN-Nipple
Max Angle:51 deg @ 5,301’ MD
Last Tag:PXN plug in XN @ 10,702’ MD
Brief Well Summary:
S-23 is an Ivishak and Sag artificial lift producer that has been shut in since June 2023
Current Status:
NotOperable - PAL. Currently shut in due to TxIA communication through GLM #4 and leaking wellhead starting
head flange.
Objective:
- Repair starting head to address observable hydraulic leak
- Install POGLM to address logged tubing to inner annulus communication at GLM #4
WBL Steps:
1 FB Perform CMIT to confirm well envelope hydraulic competency
2 DHD Repair Starting Head
3 SL Pull PXN from XN-Nipple
4 SL Install nipple reducer with 2-3/8 XN plug and pressure test
5 FB Perform CMIT to confirm nipple reducer hydraulic competency
6 SL Install gas lift valves in GLM #1,2,3,5
7 EL Set POGLMacross GLM#4
8 FB Perform MIT-T to confirm POGLM and OV hydraulic competency
9 SL Pull 2-3/8 XN plug from nipple reducer
Procedural Steps:
Fullbore
1. Perform CMIT to confirm hydraulic competency of 9-5/8” casing and tubing packer
x Target pressure of 2500 psi w/ max pressure 2750 psi
Wellhead repair
1. Repair leaking starting head adapter to restore outer annulus well integrity
a. Nitrogen purge surface casing as per welding service company requirements
b. Heat soak relevant section of wellhead and surface casing as per welding service company
requirements
c. Weld repair starting head to close hydraulic leak path
d. Perform NDE of weld to confirm weld suitability
Slickline
1. Drift to PXN plug is recommended but, at supervisors discretion
x Last tubing entry was June 28, 2023 for MFC log and well has been shut in since.
POGLM
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
x Successful 1500psi CMIT on June 27, 2023
2. Pull PXN plug at 10,681’ SLMD located in XN-nipple 10,702’ MD
x PXN plug installed June 26, 2023
3. Install 4-1/2” x 2-3/8” XN-nipple reducer at 10,702’ MD
4. Set 2-3/8” XXN plug in nipple reducer
5. Set valve catcher on XXN plug
Fullbore
1. Perform CMIT to confirm nipple reducer hydraulic competency
x Target pressure of 2500 psi w/ max pressure 2750 psi
Slickline
1. Replace gas lift valves in GLM# 1, 2, 3, 5 as per ALS model
2. Pull valve catcher from XXN plug in nipple reducer
E-Line
1. Set POGLMacross GLM #4 at 5919’ MD per tie-in log
x Confirm completion equipment that arrives on location has drift capacity to pull 2-3/8” XXN plug
through entire assembly.
i. 2-3/8” GLM Drift: 1.901”
ii. 2-3/8” XN seal bore: 1.875”
x Consider removal of snap latch if lubricator length allows single run option.
x First run: Install lower tubing patch packer with snap latch profile
i. Baker 10 setting tool
x Second run: Install upper tubing patch packer, 2-3/8” GLM, and snap latch
i. Snap into lower tubing patch packer and pull tension to confirm
ii. Baker 10 setting tool
x Locate top slip/element at: 5914’MD
i. Center of pup above GLM #4
x Locate bottom slip /element: 5943’-5973’ MD
i. Range provided is 5’ inside range 3 joint below GLM #4
ii. Selection of bottom slip / element location dependent on maximizing lubricator length
available.
x Note: Full joint directly above GLM #4 is reported as 57.97% damage per HAL MFC log and should
not be used to set tubing patch upper slip/element in.
x Note: Pup below GLM #4 is indeterminately close to identified leak location via LDL log and should
not be used to set tubing patch bottom slip/element in.
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
ôIJťôŘĺċϙťĺŕŜīĖŕϯôīôıôIJťϙīĺèÍťôîĖIJϙèôIJťôŘϙĺċϙŕŪŕÍæĺŽôϙ@[aϙϭ͓ôIJťôŘĺċϙæĺťťĺıŜīĖŕϯôīôıôIJťϙīĺèÍťôîĖIJϙċŪīīϙĤĺĖIJťϙæôīĺſϙ@[aϭ͓ϙÍťϙīôÍŜťϙ͔ċťϙÍſÍƅċŘĺıϙÍϙèĺIJIJôèťĖĺIJ
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
Fullbore
1. Perform MIT-T to confirm hydraulic competency of tubing patch and gas lift valve installation
x Target pressure of 2500 psi w/ max pressure 2750 psi
Slickline
1. Pull 2-3/8” XXN plug from 4-1/2” x 2-3/8” nipple reducer
Attachments
x Current Wellbore Schematic
x Reference Leak Detection Log
x Relevent Section of Leak Detection Log
x Reference Multi Finger Caliper Log
x Relevent Section of Multi Finger Caliper Log:
x Sundry Change Form
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
Current Wellbore Schematic:
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
Proposed Wellbore Schematic
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
Reference Leak Detection Log:
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
Relevent Section of Leak Detection Log:
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
Reference Multi Finger Caliper Log
SH Repair & Tubing Patch
Well: S-23
PTD: 190-127
API: 50-029-22088-00
Relevent Section of Multi Finger Caliper Log
Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: August 16, 2024Subject: Changes to Approved Sundry Procedure for Well S-23Sundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:190-127
6.50-029-22088-00-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
11634
11582
9188
10625
None
8521
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 79 20" 34 - 113 34 - 113
Surface 2669 13-3/8" 33 - 2702 33 - 2702 5020 2260
Intermediate 10899 9-5/8" 29 - 10928 29 - 8732 6870 4760
Production
Perforation Depth: Measured depth: 10949 - 11408
feet
True vertical depth:8746 - 9067 feet
Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 27 - 10741 28 - 8601
10625 8521Packers and SSSV (type, measured and
true vertical depth)
4-1/2" Baker F-1 Packer
Liner 932 7" 10692 - 11624 8567 - 9217 7240 / 8180 5410 / 7020
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
1st Stage - Slowly pump cement into OA valve while taking returns from OA companion side to half drum. Fluid level @ 60' before starting. Fill up volume is 3.6 bbls. Hesitate and pump to allow cement
and diesel to swap out. 10 bbls away over 5 hrs and still have dirty returns after each 30 min hesitation. Decide to let cement set and will return 3-4 days to attempt to sqz starting head leak.
2nd Stage - Drop gel pill in OA then pump 5 bbls of 14.0 ppg SqueezeCrete cement. Pressure up to 1200 psi in 300 psi steps. Held 1200 psi for one hour. No visible leaks on starting head
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
21818002524121
2572200 1262
1220
508 379
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Aras Worthington
aras.worthington@hilcorp.com
Authorized Name:Stan Golis
Authorized Title:
Authorized Signature with Date:Contact Phone:(907)564-4763
Treatment descriptions including volumes used and final pressure:
13.
Operations Manager
Operations Performed1.
Abandon Plug Perforations Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured9224
Sundry Number or N/A if C.O. Exempt:
320-005
No SSSV Installed
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Starting Head Squeeze
Operations shutdown
Change Approved Program
5
Surface - ~100'
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well5
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 028257 & 028258 PBU S-23
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
Unknown x5, 11582
By Samantha Carlisle at 1:01 pm, Oct 20, 2020
Digitally signed by Stan Golis
DN: cn=Stan Golis,
ou=Users
Date: 2020.10.20 12:38:30 -
08'00'
Stan Golis
DSR-10/20/2020MGR22OCT2020 RBDMS HEW 11/10/2020
SFD 10/20/2020
ACTIVITY DATE SUMMARY
5/13/2020
T/I/O = SI/300/0. Remove OA working side 2" valve and companion side 2" blind flange.
Removed 2" VR plug from companion side. DHD strapped OA. Install 2" integrol flanges
on both sides and torque to API specs. Install Block valves and 1502 caps. RDMO ***Job
Complete*** SEE LOG FOR DETAILS Final T/I/O = SI/300/0. IA/OA = OTG
Note: Valve and blind left in well house. Will need to bring out 2" Tapped blind flange for
re-install
5/13/2020
T/I/O = SI/300/0. Temp = SI. Strap TOC & FL on OA. ALP = 0 psi. SI @ CV.
Strapped 200' to TOC. Strapped 60' to FL.
Valve Crew in control of well on departure. 13:00
5/18/2020
Job Scope: OA Cement Squeeze to repair starting head leak. Slowly pump cement into
OA valve while taking reurns from OA companion side to half drum. Fluid level @ 60'
before starting. Fill up volume is 3.6 bbls. hesitate and pump to allow cement and diesel to
swap out. 10 bbls away over 5 hrs and still have dirty returns after each 30 min hesitation.
Decide to let cement set and will retun 3-4 days to attempt to sqz starting head leak
***to be continued***
5/22/2020
T/I/O = SSV/340/0. Temp = SI. Strap TOC in OA (OA dwnsqz). ALP = 0 psi, SI at mod
and CV. Maintained open bleed on OA for 1 hr. Pulled block valves from OA. Strapped
OA to TOC @ 215' (12.84 bbls). Reinstalled block valves. FWHPs = SSV/340/0.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:45
5/26/2020
Objective: Repair leak at starting head .Scope of activity: Reverse out fluid from OA
objective depth of ~200'. Was able to get 75 ' down and recover 3.64 bbls of fluid (Crude).
See Log for details. ...job in progress...
6/5/2020
Job Scope: Remove 3/8" hose form OA (pre cement). Removed 75' of 3/8" HP hose from
OA, hose mostly dry coming out chain on bottom of the hose was wet. OA FL @ ~100'.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00
6/28/2020
Objective: Repair leak at starting head. Scope of activity: Drop gel pill in OA then pump 5
bbls of 14.0 ppg SqueezeCrete cement. Pressure up to 1200 psi in 300 psi steps. Held
1200 psi for one hour. No visible leaks on starting head or exposed collar in cellar. After
one hour total loss was 110 psi. Bled OA to zero. Tags hung. Pad Op notified. ***Job
Complete***
7/2/2020
RD Intergal and block valve from working OA, Install gate valve and blind flange to
working OA. RD intergal and block from Comp OA, Install tapped blind w/ alemite fitting to
Comp OA. RDMO.
10/3/2020
***WELL S/I ON ARRIVAL***
SET 4-1/2" WHIDDON CATCHER SUB @ 10,668' SLM
PULLED RM-FLOWSLEEVE FROM ST #2 @ 10,403' MD
***CONT JOB ON 10/4/20 WSR***
10/4/2020
***CONT JOB FROM 10/3/20 WSR***
PULLED RM-DGLV FROM ST #4 @ 5919' MD.
PULLED RM-DGLV FROM ST #5 @ 3165' MD.
SET RM-LGLV IN ST #5 @ 3165' MD.
***CONT JOB ON 10/5/20 WSR***
10/4/2020
LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Begin WSR 10/4/20, Spot on
Edge of Pad, SB for Slickline Operations, Begin STBY for Scheduling. Inlet Well S-23,
Outlet Well S-19. Job in Progress, Continue on WSR 10/5/20
Daily Report of Well Operations
PBU S-23
Daily Report of Well Operations
PBU S-23
10/5/2020
LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/4/20.
Continue STBY for Scheduling. Inlet Well S-23, Outlet Well S-19. Job in Progress,
Continue on WSR 10/6/20
10/5/2020
***CONT JOB FROM 10/4/20 WSR***
ATTEMPT TO RECOVER DROPPED VALVE FROM ST #2
RECOVERED DROPPED RM-OGLV FROM ST#2 @ 10,403' MD.
SET RM-OGLV(20/64") IN ST#4 @ 5919' MD.
SET RM-DGLV IN ST#2 @ 10,403' MD.
***JOB CONT'D ON 10/06/20 WSR***
10/6/2020
LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/5/20.
Complete STBY for Scheduling, Perform Unit Move, Rig Up. Inlet Well S-23, Outlet Well S-
19. Job in Progress, Continue on WSR 10/7/20
10/6/2020
***CONT'D FROM 10/05/20 WSR***
PULLED 4-1/2" WHIDDON CATCHER SUB FROM 10,681' SLM.(empty)
PULLED 4-1/2" PX-PLUG FROM X-NIPPLE @ 10,681' MD.
***WELL S/I ON DEPARTURE, PAD-OP NOTIFIED OF STATUS***
10/7/2020
LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/6/20.
Complete Rig Up, PT, POP Well, Initiate GL, Pumping MeOH Pills as needed, Continue to
Flow/ Stabilize Well. Inlet Well S-23, Outlet Well S-19. Job in Progress, Continue on WSR
10/8/20
10/8/2020
LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/7/20.
Continue Flow/ Stabilize Well, DHD on Location/ Fluid Level @ SO, PCC increased GLR/
Valve @ 35%. Continue to Flow/ Stabilize Well. Inlet Well S-23, Outlet Well S-19. Job in
Progress, Continue on WSR 10/9/20
10/8/2020
T/I/O = 230/1420/600. Temp = 68°. IA FL (Testers req). AL SI @ CV. PB GL rigged to
IA is online. IA FL @ 5919' (#4 SO, 317 bbls).
Testers in control of well upon departure. 09:15
10/9/2020
LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/8/20.
Perform 12 Hr Well Test, Continue Flowback. Inlet Well S-23, Outlet Well S-19. Job in
Progress, Continue on WSR 10/10/20
10/10/2020
LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/9/20.
Perform 12 Hr Well Test, Reduced GLR to 2.0mmscf/d, PCC Diverted Well into WPS,
Continue Flowback. Inlet Well S-23, Outlet Well S-19. Job in Progress, Continue on WSR
10/11/20
10/11/2020
LRS Well Test Unit 6. POP Well under Eval Post OA Sqz. Continued from WSR 10/10/20.
Perform 4 Hr Purge, Perform 12 Hr Piggyback Test, Begin RDMO. Inlet Well S-23, Outlet
Well S-19. Job Complete/ End WSR
10/12/2020
T/I/O = SSV/1620/Vac. Temp = SI. WHPs (Eval SH leak). AL SI & blinded @ casing
valve (40 psi). Poor boy AL rigged up to companion side IA valve (#19 AL, 1740 psi).
Crude has seeped from the upper SH from the 2 to 4 o'clock positions (could not tell how
old seepage is, cleaned SH before departure). Well has a sombrero liner installed with a
minor amount of crude sepage in it.
SV. WV, SSV = C. MV = O. IA, OA = OTG. 11:00
10/13/2020
T/I/O = SSV/1620/Vac. Temp = SI. WHPs (Eval SC leak). AL SI @ blinded @ casing
valve (40 psi). Poor boy AL rigged up to companion side IA (#19 AL, 1740 psi, S/I). No
new seepage on starting head. Well has a sombrero liner installed.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:15
10/14/2020
T/I/O = 1550/1550/VAC. Temp = SI. WHPs & T FL (eval SC leak). AL blined @ CV. T
FL @ 6180' (4071' below SSSVN).
SV, WV, SSV = C. MV = O. IA, OA = OTG. 22:30
Daily Report of Well Operations
PBU S-23
10/16/2020
T/I/O = SSV/1550/VAC. Temp = SI. WHPs (eval SC leak). AL blined @ CV. Temporary
liner installed in cellar. No new seepage detected. WHPs unchanged overnight.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 00:30
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Aras Worthington
Interventions and Integrity Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU S-23
Permit to Drill Number: 190-127
Sundry Number: 320-005
Dear Mr. Worthington:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.clogcc.daska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
J re . P e
Chair
DATED this 15 day of January, 2020.
RBDMSL5�-' SAN 15 2020
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
JAN 0 6 2020
pTs r(13/zo
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well m Oper ti uglriw
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑
Plug for Rednll ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other OA Squeeze 0 .
2. Operator Name: BP Exploration (Alaska), Inc
4. Current Well Class:
Exploratory ❑ Development 0-
5. Permit to Drill Number: 190-127
3, Address: P.O. Box 196612 Anchorage, AK
99519-6612
Stratigraphic ❑ Service ❑
6. API Number: 50-029-22088-00-00
7. If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
8. Well Name and Number:
Will planned perforations require a spacing exception? Yes ❑ No El
PBU 5-23 `
9. Property Designation (Lease Number):
10. Field/Pools-
ADL 0282574& 028258 '
PRUDHOE BAY. PRUDHOE OIL -
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):
Plugs (MD): Junk (MD):
11634 9224 10681 8560
10681 Unknown x5,11582
Casing Length Size MD TVD
Burst Collapse
Structural
Conductor 80 20" 34-113 34-113
Surface 2669 13-3/8" 33-2702 33-2702
5020 2260
Intermediate 1 10899 9-5/8" 1 29-10928 1 29-8732
1 6870 1 4760
Production
Liner 1 932 7" 10692 - 11624 8567 - 9217
7240 / 8180 5410 / 7020
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
10949 - 11408
8746-9067
4-1 /2" 12.8#
L-80
1 27-10741
Packers and SSSV Type: 4-1/2" Baker Packer
Packers and SSSV MD (ft) and TVD (ft): 10625/8522
No SSSV Installed
No SSSV Installed
12. Attachments: Proposal Summary 9 Wellbore Schematic 21
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development m Service ❑
14. Estimated Date for Commencing Operations: January 10, 2020
15. Well Status after proposed work:
Oil EI WINJ ❑ WDSPL ❑ Suspended ❑
16. Verbal Approval: Date:
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
IT I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Worthington, Ares J
be deviated from without prior written approval.
Contact Email: Aras.Worthingtonabp.com
Authorized Name: Worthington, Aras J
Contact Phone: +1 907 564 4102
Authorized Title: Interyenjilio & Integrit ngineer
Authorized Signature: Date: //3
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
_ ��
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other:
46DMS 4" r/JAN 1 51010
Post Initial Injection MIT Regd? Yes ❑ No ❑
Spacing Ex\ptonquired? Yes ❑ No lid Subsequent Form Required: 1Q - yoy
Approved bCOMMISSIONER COMMISSIONAPPROVEDBDate
Date: i ) i J /f �J
ME
9
Form 10-403 Revised 04/2017
ORIGINAL
Submit Form antl
Approved application is valid for 12 months from the date of approval. Attachments in Duplicate
S-23 OA Cement Squeeze
Intervention Engineer
Aras Worthington (907) 564-4102
Production Engineer
Samuel Infanti (907) 564-5676
Expected Start Date:
January 1011 2020
History
S-23 was a producer on artificial lift. The OA shoe was downsqueezed with cement in 2003 with
the TOC displaced to —2000' MD.
The well developed a starting head leak which was diagnosed in 2014 during an MITOA.
Current Status
The well is classified as "Not Operable" by BP and is secured with a tubing tail plug with a passing
CMIT TAA to 3000 psi.
Objective
Pump sealant down the OA into the starting head leak and squeeze the leak.
Procedural steps
DHD/Special projects
1. Pump sealant (squeezecrete, Well Lock, or similar product) into the OA.
2. Squeeze sealant into the starting head leak.
3. Wait on sealant to cure.
DHD/Well Integrity Engineer
1. POP well Under -Evaluation and monitor starting head for any leakage.
2. If there is no leakage, convert well to Operable status.
T1*E- 4-1116"QW
V1Hl7EAIf
FMC
AC"TC R- ..
OTB
443 SCV-_
-845E
6F. UXV -
3s. f3'
I(OP
3185
Lt3x Angle =
51• 53419"
Mum ATS-
11120'
vatum TV0-
6"35
13 38" CSO, 885, N17 80. U
Minimum 10 = 3.126" @ 10702'
4-1P2" OTIS XN NIPPLE
4-117" 7n0, 1260, 1 "80 Tho,
,0152 6P1, 17 - 31h8"
fb-118' C:G, 47a: NT moi_
WOW
PFJdMAATION Sl.SM1RY
WF LOG. Mm 1�9TV ON 10110190
AWO FATTOP SFT 4V0 10449`
.
Note. Wer m Pmduc&m 06 "or Mtomal pert data
SLOE SFF Nf6ttVAL
rJSOz
,`"4107
1 SOS '
3-M" 4 10949-11019
0
01tf19193
07151
G 3378" 10 11165 - 11172
O
1120191
E
-Ul" 6 11182 -11210
Q
11/01191
O1N'l
4 11182-112%
0
11f03790
09/30/15
..338- 4 19304 11&54
O
11I03f80
OT13
3-3.18" 4 11384 - 11386
4
1113196
09130715
' 3-3+0" 4 11396 - 11408
O
11/03/90
0715
WSL
MA
-
0V.W5
t' t f,V, 261 ASOTrAS, OTBI Cpl, 13=8.276" 11506'
LF871O 11882'-.
t Wk 29k _I -AO RTS6 6371 hof. 1) - 6 194-J-t�-11624' ...
S � SAFETY 40TES N01I Y G( OFANY W571. OPEPAn0N
WtICUOOUIOINGR4A&I t i OW OR T7a )WN RA 15'fi Ou
TO r SIQO R-OWLINLrP0'TENTIAl 131051411.
GAS LFT wNrm S
I UAKETI MC AN" OR C -� 3A96�
io&W i #g-t;,A•; a1,r Bwx :7<Tt, ID ='59F
76738' ._31--C1.M6 TT L00Oi561N5�9L7
19108' 7'Ab1F3187 JO14T
r ?? ii FiSFi POS OOVtAsPRT�K'CBYTRALQSt
L J�
AFAd {015031145
I �� !.-?Lbn rx>cALwtraAl+rararu:uo�
^_�? ] t6n 2 11.4393134 tiH#:N1, T 5(41 bN3 F75.G i
f 11 a82' FTBn-VWL i4i L0(:49O42 PP4GEn NCAAYii_._. =_.. ,
--� BL@�4'A47H4T rlV JCSS ftAVFH15T4?Rt PF _I
C0A114G 0L51 VWH KOAW,EC OR 15ANWGEOPf$
r�D 7VD
I CSVTVPE
4LV
FLAT&
€[Nil"
O4TE
5
3165 13163
9
07151
CMM
W
0
,89=15
4
.5919 152$5
48
O1N'l
OABI
RAA
r 0
09/30/15
3
8397' 6995
44
OT13
CMY
FN
0
09130715
2
10403! 6:965
46
0715
WSL
MA
-
0V.W5
1
10589184%
46
0718
DMY
1`,A
0
14122,114
I UAKETI MC AN" OR C -� 3A96�
io&W i #g-t;,A•; a1,r Bwx :7<Tt, ID ='59F
76738' ._31--C1.M6 TT L00Oi561N5�9L7
19108' 7'Ab1F3187 JO14T
r ?? ii FiSFi POS OOVtAsPRT�K'CBYTRALQSt
L J�
AFAd {015031145
I �� !.-?Lbn rx>cALwtraAl+rararu:uo�
^_�? ] t6n 2 11.4393134 tiH#:N1, T 5(41 bN3 F75.G i
f 11 a82' FTBn-VWL i4i L0(:49O42 PP4GEn NCAAYii_._. =_.. ,
--� BL@�4'A47H4T rlV JCSS ftAVFH15T4?Rt PF _I
C0A114G 0L51 VWH KOAW,EC OR 15ANWGEOPf$
OF Tye • •
h*.P\\ //7 tv THE STATE Alaska Oil and Gas
01,
til,. A of T e 1 Conservation Commission
333 West Seventh Avenue
"74-7414•1.
GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572
Main: 907.279.1433
ALAS Fax: 907.276.7542
www.aogcc.alaska.gov
Oliver Sternick
Well Integrity Engineer 5CAIIEa MAS?• p
BP Exploration (Alaska), Inc. 4 2016
P.O. Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU S-23
Permit to Drill Number: 190-127
Sundry Number: 316-128
Dear Mr. Sternick:
Enclosed is the approved application for sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the
AOGCC an application for reconsideration. A request for reconsideration is considered timely if
it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend.
Sincerely,
f-2:Le,7-7r,t./
Cathy . Foerster
�� Chair
DATED this!-'� day of February, 2016.
RBDMS ti v FEB 2 6 2016
STATE OF ALASKA
LASKA OIL AND GAS CONSERVATION COMMI
APPLICATION FOR SUNDRY APPROVA S
20 MC 25.280
1. Type of Request: Abandon 0 Plug Perforations 0 • Fracture Stimulate 0 Repair Well ❑ Operations shutdown 0
Suspend 0 Perforate 0 Other Stimulate 0 Pull Tabing 0 Change Approved Program 0
Plug for Redrill 0 Perforate New Pool ❑ Re-enter Susp Well 0 Alter Casing 0 Other New Tech-BiSN Plug 0
2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number 190-127 -
Exploratory 0 Development 0
3. Address: P.O.Box 196612 Anchorage,AK 6. API Number: 50-029-22088-00-00
•
99519-6612 Stratigraphic 0 Service 0
7. If perforating: 8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes 0 No 0 PBU S-23 RECEIVED
9. Property Designation(Lease Number): 10. Field/Pools: FEB 1 7 2016
ADL 0028258 ' PRUDHOE BAY,PRUDHOE OIL ' D-7# Z�2¢l4
11. PRESENT WELL CONDITION SUMMARY ®® �/'��/ lac
A®�.IAe"w,.
Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD):
11634 • 9224 . 10681 8560 10681 See Attachment
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 80 20"Conductor 33-113 33-113 0 0
Surface 2669 13-3/8"68#L-80 33-2702 33-2702 5020 2260
Intermediate 10899 9-5/8"47#L-80 29-10928 29-8732 6870 4760
Production
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
See Attachment See Attachment 4-1/2"12.6#L-80 L-80 27-10741
Packers and SSSV Type: 4-1/2"Baker F-1 Packer Packers and SSSV MD(ft)and TVD(ft): 10652, 8539.56
No SSSV Installed No SSSV Installed
12.Attachments: Proposal Summary 0 Wellbore Schematic 0 13.Well Class after proposed work:
-
Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development 0 Service 0
14.Estimated Date for Commencing Operations: 3/8/16 15. Well Status after proposed work:
Oil 0 WINJ 0 WDSPL 0 Suspended 0
16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0
Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0
17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Sternicki,Oliver R
be deviated from without prior written approval.
Email Oliver.Sternicki@bp.com
Printed Name Sternicki,Oliver R Title Well Integrity Engineer
Signature --- -� Phone +1 907 564 4301 Date 2 /7 /
COMMISSION USE ONLY !
Conditions of approval:Notify Commission so that a representative may witness Sundry Number:
3\ R - X21(
Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0
Other:
/
Post Initial Injection MIT Req'd? Yes 0 No 'J
Spacing Exception Required? Yes 0 No g Subsequent Form Required: `G 4 c4,
APPROVED BYTHE
Approved by: "1
COMMISSIONER COMMISSION Date: Z—Z�/�
it L /7 //1.•
ORIGINAL RBDMS FEB L 6 2016
,e2-4o
Submit Form and
Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate
• •
Junk Attachment
PBU S-23
SW Name MD Date Comments
S-23 11299 07/03/2014 Piece of WRP Rubber Element
S-23 11345 07/03/2014 PDS Bowstring Centralizer Arm
S-23 11390 06/02/2008 PDS Caliper Arms
S-23 11400 01/26/2007 2 Rubber Elements, 1 Stiffing Ring
S-23 11582 01/26/2007 W/L Tel Locator Finger In GLM#1
•
a o 0 0 0 0
R O O r N O
C N O ti N-
C)
o 0 0 0 0
L N N' CC) CO
7 O CO N r t7
m O CO N- CO 00
co N N c-
0 Cr) CO O
f� N- N CO
N CO O) 6) CO
I I I I I I
H
10 U)
M M O C) M N-
M M N O r N
O O
Asa
N CO Nt
M O N O N d'
r O CO CO
N.
r N O r r 0
r r r '-
C.)
EIIIIII
M LOQ N MM CD N.
M co N N
/^= r c-
a.o- Loo
2 1 C?c OaO
C) UJJaooJ
_C CD -3 *k J J 4:k
C N U a`O N N
0
oM11n � F� �
= C)
OO co O
Jcao0 (000N- rN-N O 0
r
W
� Q
c0H 0
U
wW
O O � W Q. c Z
ZCW W W CD
ODF- ZZD
U fn Z J
• .
0
0
0
CO O) r C) N r tp CO "7'
Cfl N M r M Cr O N
O▪ C) O N C") CO N LC) CO
p 1- O) C) C) CA O O O
a a0 CO CO CO CSO CA C) O)
>
0.
0
- 00 1- CO O N (n CO CD
t N N N Co r M Tt C70
fl- O CO mi N tf) 4 CO o0 ❑
d � CS) O N M CA (,) t() W
p N- oO CA CA CS) CA O O >
p
00 CO OD Cb 00 00 CA CA 0
w
❑• ❑ w z
w p W ❑
N Y J o
U 0
m O O Cr) W Y
Cn N N O d d O (70 J U U W W
_ f- O N CA to C70 O J J J d d fn Z
O r N N N C�) M ,T ¢ ¢ ¢ w (9 -
� U
A U J W U U W
W • r r r . . . . . Z Z Z OJ J J D J
Ca ¢ ¢ ¢ 2 ❑ ❑ 0_ W 4_
O O O w d c Z o z
W w W 0_ I— I— ¢ J ¢
V M 2 2 2 O co U) Co to cn
}ACV
< CO a
0
• r CA LO N N O V CO
M Q CO 00 O N O CO CA
O LLI a) O `- N N M M M
+� li 0• r r r r r r r r
L d
O 2 = 0) = 10 O a J a
I-2 2 O to cn cn up cn
0)
a
0
U
C• C/) C/) C/) Cn C/) C/) U) C/)
;, mmmmmmmm
a
0
0
m
0
0
a tnUOUntnUDUlU, UD ❑ 0
0 0 0 0 0 0 0 0 w
O N N N N N N N N Z
¢ W
Ow N W
N N N N N N N N Z w W U W W W W
00.0 M C) C) M M M MCA
W J J J ❑ 0
¢ ¢ 0_ 0) U UL U W d w
a)
E
m
z
m M M M C') m m M
C0 °4N N N N N N N tl 0 C/) O w N tL
Ch (A C/) C/) U) Ci) Ch (/) ¢ ¢ m m ti � W a c
• ALASKA WELL ACT).STATEMENT OF REQUIREMENTS (V2.0,DBID,EAZ,BPG 10/12/15)
General Information
Well Name: S-23 Well Type: Gas Lift Producer
API Number: 50-029-22088-00 Well Activity Conventional 4
Classification:
Activity Description: Set BiSN Plug Cost Code/AFE: APBOTMMA
Field/Reservoir: PRUDHOE IVISHAK 12 Month Avg IOR,
bopd:
Job Type: Profile Modification
Estimated Cost,
$K:
AWGRS Job Scope: NEW TECHNOLOGY PROJECT Other regulatory
requirements?
Sundry Form 10-403
Required? Yes
Sundry Form 10-404
Required? Yes Primary Secondary
Engineer: Matt Bergene Contact numbers: (907) 564-4849 (307)630-9653
Well Intervention Engineer: Oliver Sternicki Contact numbers: (907) 564-4301 (907)350-075
Lead Engineer: Brian Glasheen Contact numbers: (907) 564-5905 (907) 545-1144
Date Created: February 12, 2016
Revisions(date,who,what changed):
Current Well Status Information
Water Rate or Gas Rate or FTP or Injectior
Date Oil Rate In) Rate Gas Injection GOR Choke Setting Gas Lift Rate Pressure
(bopd) (bwpd)Water Rate (scf/stbo) (Mscf/Day)
Cut(%) (Mscf/Day) (psi)
11/26/2014 121 2524 bwpd, 1,220 10,099 95 3,000 218
WC 95.43%
Current Status: Not Operable Shut In Inclination>70°at Depth(ft)
Recent H2S (date, Maximum Deviation (Angle and 51° 5,301' MD
ppm) 11/16/2014 *ppm Depth) —
Datum depth,ft TVDss 8800' TVDss Dogleg Severity(Angle and Depth) 3° 5,512' MD
Reservoir pressure(date, 4/19/2005 3,426psi Minimum ID and Depth
psig)
P 3.725" 10,702' MD
Reservoir Temp,F 224° F Shut-in Wellhead Pressure
Known mech. integrity
problems(specifics) 07/04/14: Caliper 4.5"0-64% penetration. IA x OA comm unmanageable by bleeds
Last downhole operation (date, 10/5/2015 Set TTP @ 10681' MD, set DGLV in sta#2,
operation)
Most recent TD tag(date,depth, 7/3/2014 11,162' MD 4 1/2" BRUSH, 3.68"CENT, 2' x 1 7/8"WB, 3.70"CENT&
toolstring OD) 3.50" MAGNET
Surface Kit Fit-for-Service? If No,Why? If well has been shut in for> 1 year or job cost>$500M, fill out Non Rig
Surface Equipment Checklist.
Comments,well history, SH leak confirmed-04/11/14
background information, IA x OA comm unmanageable by bleeds
etc: OA Downsqueezed-4/13/03
> 04/17/14: MIT-IA Passed to 2500 psi
>07/04/14: Set LGLVs, Caliper 4.5"0-64% pen; 7"281 jts 0-29% pen, 3 its 70-93% pen, Possible hole
11,081'MD, ovality
> 09/29/15: Set TTP @ 10681' MD, set DGLV in sta#2, CMIT-TxIA Passed to 2000 psi
•
• Well Intervention Details •
Suspected Well Problem: SH Leak
Specific Intervention or Well Objectives:
1 Set 3.5" OD BiSN plug in 4.5"tubing tail and pressure test plug to validate setting.
2
3
Key risks,critical issues: Mitigation plan:
1 New technology L2RA for BiSN plug
2 Setting off BiSN plug at surface. BiSN specific procedure to be followed
3 Bursting corroded 4.5"tubing Hold 1000 psi back pressure on the IA While conducting
MIT-T.
Summary Service Line Activity
Step#
1 FB CMIT-TxIA to 3000 psi
2 SL Pull PXN plug
3 EL Set bottom of BiSN plug @10709'
3 FB CMIT-TxIA to 500 psi, 1000 psi, 1500 psi, 2000 psi, 2500 psi, 3000 psi. LLR if fails
Detailed work scope(If no RP/SOP exists for the intervention type,a well-specific procedure is required in addition to the SOR):
1 FB CMIT-TxIA to 3000 psi
2 SL Pull PXN plug
Set bottom of BiSN plug @10709'. Though not an explosives operation follow grounding and isolation
3 EL procedures set forth in GWO Alaska Region Recommended Practice: E-Line Set Packers,Retainers,
and Bridge Plugs.
Tie into the attached tubing tally dated 10/15/1990
3 FB CMIT-TxIA to 500 psi, 1000 psi, 1500 psi, 2000 psi, 2500 psi, 3000 psi. LLR if fails
Performance Expectations(may be NA if no change anticipated due to the intervention)
BOPD: MMSCFD: BWPD:
Expected Production Rates: —
FTP(psi): Choke setting: PI(bfpd/psi dp)
Post job POP instructions: Leave SI
Attachments-include in separate excel worksheets
Required attachments: Current wellbore schematic
As needed: Perf form,logging form,well test chart,annotated mini log,annotated log section,tubing/casing tallies,Wellhead
info,etc
Approvals
Management Approval: Date:
Wells Approval: Date:
TREE= 4-1/16"aw SAFETY NOTES: NOTIFY GC OF ANY W8.1 OPERATION
S ACTUATOD2=__._____ • -2 3 TO 3 FLOWLINHIDULD NEE(POTENTIALSE FLOW
ON RATES Dl
E
OTIS
ODS.ELEV= 64.56'
BE ESV= 35.73'
KOP= 3165
Max Angfe= 51"@ 5301'
.__-__..------_. --- 2109' —14-1/2"011S SSSV NP,D=3.813"
Datum MO= 11120'
Datum IVO= 8800'SS
GAS LFT MANDRELS
13-3/8"CSG,68#,NT-80,D=12.415" --I 2702' ST MD TVD DEV TYPE VLV LATCH PORT DATE
5 3165 3163 9 OTIS DMI' RM r 0 09/30/15
4 5919 5265 48 OTIS OMD' RMt ' 0 09/30/15
Minimum ID = 3.725" 10702' L 3 8397 6985 44 OTIS OMy' RM r 0 09/30/15
2 10403 8366 46 OTIS FLWSLV RM — 09/30/15
4-1/2" OTIS XN NIPPLE 1 10589 8496 46 OTIS OMY RA ' 0 11/22/94
I I 10618' —14-1/2"PKR SWS NP,ID=3.813"
10624' BAKER TBG ANCHOR,D=3.958
10625' —9-5/8"x 4-1/2"BKR PKR,D=3.99"
'® 10681' 4-1/2"FKR SWS NP,ID=3.813"
TOP OF 7"LNR -H 10692' 10681' --14-1/2"PX PLUG(09/29/15)
10702' H4-112"OTIS XN NP,D=3.725"
to Tog k gr5A''pl-y
4-1/2"TBG,12.6#,L-80 TDS, —{ 10714' 10714' H4-1/2"WLEG,D=3.958"
.0152 bpf,E)=3.958" 10738' —{ELMD TT LOGGED 01/05/90
9-5/8"CSG,47#,NT-80S,ID=8.681" H 10928' 1
FEFFORATlON SLM,4ARY
RE=LOG:MWD RESITN ON 10/10/90
ANGLE AT TOP FERF:46"@ 10949'
Note:Refer to Production D8 for historical pert data 11108' —17"MARKER JOINT
SEE SPF INTERVAL Opn/Sgz SHOT SQZ
3-3/8" 4 10949-11019 0 07/09/93
3-3/8" 10 11165-11172 0 11/20/91
3-3/8" 6 11182-11220 0 11/01/91
3-3/8" 4 11182-11294 0 11/03/90ilk ?? —I FISH-PECE OF INRP RUBBER H.EN(07/03/14)
3318" 4 11304-11354 0 11/03/90 ' ?? —ASH-FDS BOWSPRNG CHYTRALIZD32
3-3/8" 4 11364-11386 0 11/03/90Ilk
3-3/8" 4 11396-11408 0 11/03/90
p ?? —{FISH-PDS CA LEER ARMS(06/02/08)
7"LNR,26#,L-80 TC4S,.0383 bpf,D=6.276" -H 11505' 'I ' ?? FISH: 2 RLEBB213i3VID JT,1 STFFNG PNG
11582' —ASH-W/L TEL LOCATOR FINGER N GLM#1
PBTD —I 11582'
........4
1111111 SUBSEQUENT CTU JOBS HAVE HISTORYOF
111111111/1111,
1 O MP G CXJT WITH MARKED OR DAMAGBD PIPE
7'LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" —{ 11624' 1 1.1•� 1
DATE REV BY COMutBVTS DATE REV BY COMMENTS NITS FRUDHOE BAY UNIT
11/06!90 N-18E ORIGINAL COMPLETION 10/02/15 TBDJMtD GLV C7O(09/30/15) WELL: S-23
07/07/14 PJC API NUMBER CORRECTION FORINT No: '1901270
07/08/14 WECIJP4)GLV C7O(07/04/14) AR No: 50-029-22088-00
07/08/14 JMD LEGENI]'OKB CORRECTIONS Sec.35,T12N,T12E,1631'FN &944'FWL
07/08/14 JAMJMD PULL WRPfFISH(07/02-03!14)
10/02115 TBLYJMD SET PX PLUG(09/29/15) BP Exploration(Alaska)
' �M
WeICII0k ' , 1
"'.�,t.�• ,. 4 ,.. '" a =�,c' • d 4.w +,.
,A ,
,,„,,... ...
. i it/,,,,/ A
, h
k
}
y jr`F:
Metal to Metal Gas Tight Seal
0 No mechanical parts
Effective even in Corroded and
Damaged Casing
® Larger Drift than Traditiona o 0 . fJ
Bridge Plugs - by 'asses restrictions 0 ® ,f `® 4®° 0 0
/® ® Soo
Reduced Rig Time - Ready for �! X 4° 4 )0 a
11 ®;)991 t 3 4 ®V D
Testing in 1 /2 hour ,d' ' J,;> ® ®
® ®® ®/
0 i
. . igh Holding Pressure, .. j.
• ®,,
I
•
4 High Working Temperature up to 600 °C
f` )a♦♦$
If •I•$I
9 0.1160
::
®111100,1 4 ISO 14310 -VO Rated - Gas Tig
tf 749s®0
y
q 1 �
s
m (:
` ' For further information call us on; 832-919-7500
BlSN _
email: info@bisnoiltools.com 1 www.bisnoiltools.com
OIL TOOLS
• •
~
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
June 25, 2009 R ~
Enclosed please find a spreadsheet with a list of wells from S-Pad that were treated
with corrosion inhibitor in the surface casing by conductor annulus. The corrosion
inhibitor is engineered to prevent water from entering the annular space and causing
external corrosion that could result in a surface casing leak to atmosphere. The
attached spreadsheet represents the well name, top of cement depth prior to filling and
volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
~~~'~~~r " ~-. {,. ~~,-;
~ i~~.. ~ v ~G~,:a
Torin Roschinger
BPXA, Well Integrity Coordinator
•
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
S-pad
~
~..+~
[]p}p
6/25/2009
Well Name
PTD #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor C.OffOSlOfI
inhibitod
sealant date
ft bbls f[ na al
5-078 1952020 025 NA 025 NA 2.6 5/30/2009
S-02A 1941090 025 NA 025 NA 1.7 5/25/2009
S-03 /811900 1325 NA 7325 NA 92.65 5/20/2009
5-04 1830790 0 NA 0 NA 0.9 5/25/2009
S-OSA 1951890 0 NA 0 NA 0.9 5/26/2009
5-06 1821650 0 NA 0 NA 0.9 5/26/2009
S-07A 1920980 0 NA 0 NA 0.9 5/26/2009
S-088 2010520 0 NA 0 NA 0.85 5/27/2009
5-09 1821040 1.5 NA 1.5 NA 9.4 5/37/2009
S-10A 1911230 0.5 NA 0.5 NA 3.4 5l31/2009
S-11B 1990530 025 NA 025 NA 1.7 5/27/2009
S-12A /851930 0.25 NA 0.25 NA 1.7 6/1/2009
S-13 7827350 8 NA 8 NA 55.3 6/1/2009
5-15 1840170 025 NA 025 NA 3 6/212009
S-17C 2020070 025 NA 025 NA 2.6 6/i/2009
S-18A 2021630 0.5 NA 0.5 NA 3 6/2/2009
S-19 1861160 0.75 NA 0.75 NA 22 5/19/2009
S-20A 2010450 025 NA 0.25 NA 7.3 5/19/2009
5-21 1900470 0.5 NA 0.5 NA 3.4 5l25/2009
S-22B 1970570 0.75 NA 0.75 NA 3 5/19/2009
5-23 ~ 1901270 025 NA 025 NA 1] 5/25/2009
5-248 2031630 0.5 NA 0.5 NA 2.6 5/25/2009
S-25A 1982140 0.5 NA 0.5 NA 2.6 5/25I2009
5-26 1900580 0.75 NA 0.75 NA . 3.4 5/26/2009
5-278 2031680 0.5 NA 0.5 NA 2.6 5/31/2009
S-288 2030020 0.5 NA 0.5 NA 2.6 5/31/2009
S-2sA~1 7960120 0 NA 0 NA 0.85 5/27/2009
S30 7900660 0.5 NA 0.5 NA 5.1 5/31/2009
S31A 1982200 0.5 NA 0.5 NA 3.4 5/26/2009
S-32 1901490 0.5 NA 0.5 NA 3.4 5/31/2009
5-33 1921020 0.5 NA 0.5 NA 4.3 5/26/2009
S-3a 7921360 0.5 NA 0.5 NA 3.4 5/31l2009
S35 1921480 0 NA 0 NA .BSin 5/31/2009
S38 1921160 0.75 NA 0.75 NA 425 5/27/2009
5-37 1920990 125 NA 125 NA 11.9 5/27/2009
S-38 1921270 025 NA 0.25 NA 102 5/27/2009
S-47 7960240 1.5 NA 1.5 NA 11.1 5/30/2009
5-42 1960540 0 NA 0 NA 0.9 SI30/2009
S-43 1970530 0.5 NA 0.5 NA 7.7 5/28/2009
S-44 1970070 025 NA 025 NA 1.7 5/28/2009
5-700 2000760 2 NA 2 NA 21.3 5/29/2009
5-101 2001150 125 NA 125 NA 11.9 5/29/2009
S-t02L1 2031560 1.25 NA 125 NA 11.7 5/31/2009
S-103 2001680 1.5 NA 1.5 NA t1.9 5/18l2009
S-104 2001960 1.75 NA 1.75 NA 15.3 5/20/2009
S-to5 2001520 4 NA 4 NA 32.7 5/20/2009
5-106 2010720 1625 NA 1625 NA 774.3 6/2/2009
S-7o7 2017130 2.25 NA 225 NA 28.9 5/18/2009
S-toe 2011000 3.5 NA 3.5 NA 40 5/30/2009
S-10s 2022450 2 NA 2 NA 21.3 5/30/2009
S-110 2011290 1775 NA 17J5 NA 98.6 5/30/2009
S-111 2050510 2 NA 2 NA 19.6 5/30/2009
S-112 2021350 0 NA 0 NA 0.5 5/30l2009
5-113 2021430 1.75 NA 1.75 NA 22.1 5/18/2009
5-114A 2021980 1.25 NA 125 NA 10.2 5/30/2009
5-115 2022300 2.5 NA 2.5 NA 272 5/29/2009
5-116 2031810 1.5 NA 1.5 NA 13.6 5/28/2009
5-117 2030120 1.5 NA 1.5 NA 15.3 5/29/2009
S-118 2032000 5 NA 5 NA 76.5 5/28/2009
5-1~9 2041620 1 NA 1 NA 52 5/30/2009
S-120 2031980 5.5 NA 5.5 NA 672 5/29/2009
5-121 2060410 4.5 NA 4.5 NA 53.6 5/28/2009
5-~22 2050810 3 NA 3 NA 21.3 5/29/2009
S-i23 2041370 1.5 NA 1.5 NA 20.a 5/26/2009
5-124 2061360 175 NA 1 J5 NA 11.9 5/26f2009
S-125 2070830 225 NA 225 NA 20.4 5/28/2009
5-126 20710970 125 NA 125 NA 15.3 6/7/2009
5-200 1972390 1.25 NA 125 NA 14.5 5/28l2009
S-201 2001840 0 NA 0 NA 0.85 &79/2009
S413A 2042130 2 NA 2 NA 13.6 5/29/2009
5-215 2021540 2 NA 2 NA 7E.7 &1/2~9
S-2t6 2007970 4.75 NA 4.75 NA 57 5/29/2009
5-277 2070950 0.25 NA 025 A 1.7 6/1/2009
5-400 2070740 2 NA 2 NA 9.4 5/28/2009
S-401 2060780 16 NA 16 NA 99.5 6/2/2009
5-504 0 NA 0 NA O.ES 5/28/2009
C~
~ - -~.~ HAS BEEN
O1',1 OR BEFO
STATE OF ALASKA
ALASKA'OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [~Abandon [] Suspend [] Plugging []Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1631' SNL, 4336' WEL, SEC. 35, T12N, R12E, UM
At top of productive interval
1848' SNL, 1110' WEL, SEC. 27, T12N, R12E, UM
At effective depth
1552' SNL, 1151' WEL, SEC. 27, T12N, R12E, UM
At total depth
1516' SNL, 1156' WEL, SEC. 27, T12N, R12E, UM
t5. Type of well:
[] Development
[] Exploratory
[~ Stratigraphic
[-1 Service
6. Datum Elevation (DF or KB)
KBE = 64.56'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
S-23
9. Permit Number
90-127
10. APl Number
50-029-22088
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
11634 feet
9224 feet
11583 feet
9189 feet
Length Size
Structural
Conductor 110' 20"
Surface 2673' 13-3/8"
Intermediate 10899' 9-5/8"
Production
Liner 942' 7"
Plugs (measured)
Junk (measured)
Cemented
2255 cu ft Arcticset III & II
1515 cu ft Class 'G'
266 cuft Class 'G'
139' 139'
2702' 2667'
10928' 8697'
10692'-11624'
8526'-9183'
Perforation depth: measured 11165'-11408'¢iveintervals)
true vertical subsea 8832'-9003'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 10714'
ORIGINAL
Packers and SSSV (type and measured depth) 9-5/8" Baker Packer at 10625'; SSSV Nipple at 2109'
13. Attachments [~ Description summary of proposal ~] Detailed operations program [] BOP sketch
14. Estimated date for commencing operation
December 24, 1998
16. If proposal was verbally approved
Name of-approver .Da. te approved
Contact Engineer Name/Number: C. Michael Jackson, 564-5480
15. Status of well classifications as:
[~ Oil E~ Gas [~ Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
Dan Stone Title Engineering Supervisor
Commission Use Only
Date
Conditions of Approval: Notify Commission so representative ma~witness
Plug integrity / BOP Test / Location clearance
Mechanical Integrity Test ~
,,,',riginal Sign~0 u~
Approved by order of the Co~rr~~' Johnston
Form 10-403 Rev. 06/~15/88
I Approval No.~-, _~¢~
Subse~se.~t form required 10- ~ o ~
." ~e~%' ~!~V Commissioner
Submit In Triplicate
ka are. d
rv ces
rilling
BP Exploration / ARCO Alaska Inc.
To:
Blair Wondzell - AOGCC
Date: December 16, 1998
From:
C. Michael Jackson
Subject: S-23A Application for Sundry Permit
The S-23A sidetrack is currently scheduled for Nabors 7ES following the completion of E-04A.
* Notify the field AOGCC representative with intent to plug and abandon *
Pre-Riq Work:
.
Perform a cement P&A of 15.8 ppg class 'G' cement with adequate cement volume to cover the 7" liner
from PBTD at 11,582' to a minimum of 100' above the top perforation at 11,165' plus squeeze 5 bbls to
the perforations. Estimated cement volume needed is 25 barrels. A full bore P&A is recommended but is
at the discretion of the Wells Group. There are no GLM's in the completion string.
Note: Top of cement must be at a minimum of 11,065' for AOGCC compliance. Top of cement may
extend into the tubing as long as it does not interfere with the tubing cutting operations.
2. Rig up slickline, tag and document top of cement.
3. Cut the 4 1/2" L-80 tubing in the middle of a full joint of tubing at 4600'. This cut will not be fished and is
at the discretion of the Wells Group as to chemical or jet cut.
4. Test the FMC 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes.
5. Test the casing against the cement plug to 3000 psi for 30 minutes. Freeze protect top 2200' MD with
diesel. Ensure the cut is successful and communication exists between casinq/tubin.q to avoid
tubing collapse.
6. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000
psi. Secure well.
7. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation
cost on the handover form.
Rig Operations:
10.
11.
12.
1. MIRU Nabors 7ES
2. Circulate out freeze protection. Set TWC.
3. Nipple down tree. Nipple up and test BOPE.
4. Pull 4-1/2" tubing.
5. Make up an 8.5" bridge plug on drill pipe and set at 4200'.
6. Weight test the bridge plug and pressure test the casing to 3000 psi for 30 minutes.
7. Displace the well to milling fluid and spot a 18 ppg pill from the bridge plug to the milled section.
8. RIH with 9-5/8" Baker section mill assembly and mill a 50' window from 3900' to 3950'.
9. RIH with a mule shoe to 100' below the base of the section and spot a 17 ppg balanced cement plug
from 100' below the section to 200' above the section.
Kick-off drilling the 8-1/2" intermediate section to TSag @ +9687' md(8744' TVD).
Run and cement a 7", 26# intermediate liner with a minimum of 150' liner lap in the 9-5/8".
Test the 7" and the 9-5/8" casing from the 7" landing collar to surface to 3000 psi for 30 minutes.
13. Drill the 6" production section building 34°/100' to horizontal targeting the Sag River sands(8744' TVD)
to an estimated depth of 12,403' md(8823' TVD).
14. Run a 4-1/2", 12.6# slotted production liner throughout the 6" wellbore. A Bonzai(solid/cemented and
slotted) liner will be a contingency dependent on the amount of drilled
15. Run a USIT / CBT on e-line as deep as possible logging the 4.5" and 7" cement bond for 1000' above
the top of the 4.5" liner.
;1 6. Test the 4-1/2", 7" and 9-5/8" casing from the 4-1/2" landing collar to surface to 4000 psi for 30 minutes.
17.
18.
19.
20.
21.
22.
The 4-1/2" production liner will be perforated with DPC 2.75" guns on a 400 psi under balance.
Perforating intervals to be determined after reviewing logs.
Run 4-1/2" NSCT L-80 completion tying into the 4-1/2" liner.
Test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes with 2000 psi on the tubing.
Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
Freeze protect the well to -2200' and secure the well.
Rig down and move off.
Estimated Pre-rig Start Date: 12/24/98
Estimated Spud Date: 01/07/98
C. n
564-5486
;12/;16/98
NELLHEAD: 13-5/8" - 5M FMC
ACTUATOR: OTIS
NT-8OCYHE, BTRS
CMT'd-
KOP: 2800
MAX ANGLE: 52 °
TDS
TNON~IPC TUBING
CAPACITY: 0.0152 BBL/FT
TopofTIW [ 10692 ]
Liner Hanger
9'5/8"'47#~' [ 10928]
NT-80S, NSCC
REF: LOG: MWD ESITIV.IO/10~30
3-3/8 6 11182-11220 OPEN / 11-91
3-3/8 4 11182-11294 OPEN
3-3/8 4 11304-11354 OPEN
11396-11408 O PEN
BF. ELEV = 35.73
SSSV LANDING NIPPLE
2100
-- (Otis)(3.813" ID)
GAS LIFT MANDRELS
5 3165 3100
4 5919 5200
3 8397 6892
2 10403 8302
I 10589 8432
"SWS" NIPPLE [ 10618
(PARKER) (3.813" ID)
BAKER TUBING I 10624
ANCHOR
9 -5/~" PACKER I
(Baker) (3.99" ~D) 10625
4-1~2", 12.6 #~1, L-80 TAILPIPE
4-1/~" *'SWS" NIPPLE [
(PARKER) (3.813" ID) 10681
4-1/2" "XN" NIPPLE [
(OTIS) (3.725" ID) 10702
4-1/2" WLEG (ELMD) [ 10713
10738
-- MARKER JOINT I 11113
-- ~ Minimum Top of Cemer~
NOTE: 3#ELOWLINE IN SKID
PORTIONS OF THIS WELL'S
ELOWLINE ARE 3" AND
SUBJECT TO EROSION. THE
GC SHOULD BE NOTIFIED OF
ANY WELL OPERATION
WHICH COULD iNCREASE
FLOW OR EROSION RATES.
PBTD 111302
7", 26 #/ft, L-80, BTRS I 11634
DATE
10-16-90
REV, BY
DFF
COMMENTS
iNITIAL OMPLETION
11 -O5-90 RAB iNITIAL PERFORATIONS
11/29/90 CMM ADDED TBG TAILELMD
RQM
~EC 3s: T12N: RG12E
BP EXPLORATION
11/19/91 ADDED FRAC PERES
I
AlaSka
hared
ervlces
rilling
WELL NAME
S-23
DRILLING PERMIT/SUNDRY/PRE-RIG
COVER SHEET
IThe attached work cannot commence without obtaining the required signatures in I
the "APPROVAL TO PROCEED" section at the bottom of this cover sheet.
I
"APPROVAL TO PROCEED" will signify AOGCC approval has been received.
This cover sheet is applicable to: (only one category per cover sheet)
DRILLING PERMIT
D Permit Documentation Prepared:
ODE: Date:
[-~ Permit Application Reviewed:
SDE/ES: Date:
D Permit Application Submitted:
TA: Date:
SUNDRY NOTICE
D Sundry Documentation Prepared:
ODE: Date:
D Sundry Application Reviewed:
SDE/ES: Date:
D Sundry Application Submitted:
TA: Date:
NOTE:
IF SUNDRY IS FOR PRE-RIG WORK~ USE
PRE-RIG WORK SECTION AT BELOW LEFT
AND CHECK "ABANDON" BOX BELOW
PRE-RIG WORK
Reason for Sundry (Check all that aDDIy)
Pre-Rig Memo Reviewed:
SDE/ES: ~-----~---~,~'. ~
Pre-Rig Memo Sent to Slope:
ODE:
Date: ,d,~,,]q~
Date:
Pre-Rig Sundry Documentation Prepared:
ODE: ~' ."~,.t .D.~X q,.....__~ Date:~
Pre-Ri} Sundry A~plication Reviewed:
SDE/ES: ~-----"~----,~.~~:~ Date:~/(~,)q%
Pre-Rig~,Sundry Submitted:
TA: '~h0~~ ~lC~ Date:l~
Abandon
Alter Casing
Suspend
Repair Well
Plugging
Pull Tubing
Variance
Other(Explain):
Change Approved Program
Operation Shutdown
Re-enter Suspended Well
Time Extension
Perforate
Stimulate
I APPROVAL TO PROCEED
Approved AOGCC Permit/Sundry Received TA: Date:
Approval to Commence Operations SDE/ES: Date:
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 17 November 1994
Transmittal of Data
Sent by: MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
DESCRIPTION '
1 PLS FINAL BL
1 PLS FINAL RF
1 PLS FINAL BL
1 PLS FINAL RF
1 PLS FINAL BL
1 PLs FINAL RF
1 PLS/STP FINAL BL
1 PLS/STP FINAL RF
Run # 1
Run # 1
Run # 1
Run ~ 1
Run # 1
Run # 1
Run # 1
Run # 1
1 PLS FINAL BL Run # 1
1 PLS FINAL RF Run # 1
1 PLS FINAL BL
1 PLS FINAL RF
Run # 1
Run # 1
1 PLS FINAL BL Run # 1
1 PLS FINAL RF Run # 1
ECC No.
2012.03
4123.04
4440.03
4887.06
4892.02
5613.02
5865.02
Received by: /
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
STATE OF ALASKA
ALA,~'~' OIL AND GAS CONSERVATION COMMISSI¢
REPORT (JI= SUNDRY WELL OPEI-IATIONS
1. Operations performed: Operation shutdown Stimulate Plugging
Pull tubing Alter casing Repair well
Perforate X
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1631 'SNL, 4336 WEL, SEC. 35, T12N, R 12E
At top of productive interval
1848'SNL, 11 IO'WEL, SEC.27, T12N, R 12E
At effective depth
1552'SNL, 1151 'WEL, SEC. 27, T12N, R 12E
At total depth
1516'SNL, 1156 WEL, SEC.27, T12N, R12E
5. Type of Well:
Development X
Explorato~
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE=64.56 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
S-23(42-27-12-12)
9. Permit number/approval number
90-127 /
10. APl number
50- 029-22088
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
true vertical
Length
--
11634' feet
9224' feet
Plugs (measured)
11583' feet Junk (measured)
9189' feet
Size Cemented
Measured depth
139
2702
10928
110' 20"
2673' '3 3/8" 2255 cuft Arcticset Ill&Il
10899' 9 5/8" 1515 cu ft Class G
measured
..
942' 7" 266 cu ft C/ass G 10682-11624
11165'-11172', 11182'-11294', 11304'-11354', 11364'-11386'
true vertical subsea8832'-8837',8844'-8923',8930'-8965',8972'-8987'
True vertical depth
BKB
139
2667
8697
8526-9183
Tubing (size, grade, and measured depth) 4-1/2"12.6# L-80 @ 10714'
Packers and SSSV (type and measured depth) Packer set @ 10625' and SSSV @2109'
RECEIVED
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
d iJ i'"i 2,'5
...':,.!:'_-.'-;i:a. 0::i & C, as 0ohs. 6orr~rnission
Anchorase
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
,~-?
1990 5403 2025 1796
1660 /~ 1070 1692 1384
Tubing Pressure
291
259
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby c~rti~ that the foregping is true and correct to the best of my knowledge.
Si~ned ~-/~v~,~ (i) ~-~ (~_~,.~ Title Senior TechnicalAssistant/
Form 10-404 Rev 06/15/88 ~/~
Date
SUBMIT IN DL,4'PLI(~ATE
WELL S-23(42-27-12-12)
ADDPERF
07~8~3
The following additional interval were perforated using 3 3/8"
guns, 4 SPF, random orientation and 120° phasing.
10949' - 11019' MD SAG PERFS
fjh
6/20/94
RECEIVED
d t..! I ~ (' ~:i ':' ..-. x~
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 07/13/93
T# 84761
BPX/PBU CH LOGS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
A-40 SBL
S-23 ~ ~'\~/ PERF
X-13A ~5 SBL
X-13A %%' PERF
07/09/93 #1
07/07/93 #1
07/09/93 #1
07/06/93 #1
07/07/93 #1
Z-06~,~~ PRODUCTION LOG 06/07/93 #1
Information Control
Well Records
8900.00- 9496.00 ATLAS 5 "
9720.00-10189.00 ATLAS 5 "
10850.00-11130.00 ATLAS 5 "
10220.00-10716.00 ATLAS 5 "
7800.00-10650.00 ATLAS 5 "
9850.00-10350.00 ATLAS 5 "
FI E P ORT nF'SUNDRYWEL LOPEFIATI O N S
1. Operations performed: Operation shutdown Stimulate X Plugging Perforate
Pull tubing ~ Alter casing Repair well Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1631 'SNL, 4336 WEL, SEC. 35, T12N, R 12E
At top of productive interval
1848'SNL, 1110'WEL, SEC.27, T12N, R12E
At effective depth
1552'SNL, 1151 'WEL, SEC.27, T12N, R12E
At total depth
1516'SNL, 1156 WEL, SEC.27, T12N, R12E
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE=64.56 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
S-23(42-27-12-12)
9. Permit number/approval number
90-127/
10. APl number
50- 029-22088
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11634'feet Plugs (measured)
9224*[eet
115831eet Junk (measured)
9189'~eet
Casing Length
Structural --
Conductor 110'
Surface 2673'
Intermediate 10899'
Production --
Liner 942'
Perforation depth: measured
Size Cemented Measured depth
20" 139
13 3/8" 2255 cu ft Arcticset IIl&fl 2702
9 5/8" 1515 cuft Class G 10928
7" 266 cu fi Class G 10682-11624
11165'-11172', 11182'-11294', 11304'-11354', 11364'-11386'
True vertical depth
BKB
139
2667
8697
8526-9183
true vertical subsea8832'-8837',8844'-8923',8930'-8965',8972'-8987'
Tubing (size, grade, and measured depth) 4-1/2"12.6tt L-80 @10714'
Packers and SSSV (type and measured depth) Packer set @lO625' and SSSV@2109'
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
Alaska 0JJ & Gas CoBs. 6omm~ss\O~
Anchorage
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
400 372 120 928
4110 /' 4031 650 1823
Tubing Pressure
25O
324
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations __
16. Status of well classification as:
Oil X Gas Suspended__
Service
17. I hereby ce~ify that the foreEm, ing to my
r-- ¢ ~()/~ (i; i~tru~e and correct] thebestof knowledge.
Signed~-._-~'~: ~.."i,¢'~-, ~-~ ,,,,~.~ /'~d-O~,-,~.~. Title Senior Technical Assistant,
Form 10-40~ REV-06/15/88
Date /c.~/'// //¢,-.~
SUBMIT IN DUPLICATE
WELL S-23(4.2-27-12-12)
REPERF/FRAC
The following interval was reperforated on 11/19/91 using 3 3/8
gun diameter with 6 shot density, random orientation and 60
phasing.
11165' - 11172' MD
11182' - 11202' MD
11202' - 11220' MD
Performed hydraulic fracture on 12/01/91 pumped a total of
i78,500# 16/20 carbolite pumped. 175,500# TO formation and
3,000# !eft in TBG/Liner.
FLUIDS:
30 bbls 50# Gel Prepad to Establish Rate
4-i3 bbls 50# X-Link Gel Pad W/8% ESL
797 bbls 50# X-Link Gel
169 bbls 20# Gel Flush
120 bbls Diesel to PT lines and freeze protect
10/08/92
fjh
RE6EIVED
Alaska Oil & Gas Cons.
Anchorage
BP EXPLORATION
BP Ex01oration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561.5111
DATE: 11/25/91
T# 83038
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
Information Control
Well Records
Adrian J. Martin
CL 11/19/91 #1 11014.00-11320.00 ATLAS 5 "
CARBON OXYGEN LOG 11/15/91 ~1 10800.00-11380.00 ATLAS
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: ARCO Date:l 0/18/90
CHEVRON T#:81602
EXXON
MOBIL
PHILLIPS ......... ~
TEXACO
GEOSClENCE
ARCHIVES
BP OPEN HOLE FINAL
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
S-23
S-23
S-23
S-23
S-23
S-23
S-23
S-23
RWD DUAL PROP RGD 10/08/90 #11-12 0.0-11636 TELECO
MENORY 1:600 MEASURED DEPTH
RWD DUAL PROP RGD 10/08/90 #11-12 0.0-11 636 TELECO
MENORY 1:240 TRUE VERTICAL DEPTH
RWD DUAL PROP RGD 10/08/90 #11-12 0.0-11 636 TELECO
MENORY 1:600 TRUE VERTICAL DEPTH
RWD DUAL PROP RGD 10/08/90 #11-12 0.0-11 636 TELECO
MENORY 1:240 MEASURED DEPTH
RWD DUAL PROP RGD NPFD 10/08/90 #11-12 0.0-11 636
TELECO 2" MENORY 1:600 TRUE VERTICAL DEPTH
RWD DUAL PROP RGD NPFD 10/08/90 #11-12 0.0-11 636
TELECO 5" MENORY 1:240 MEASURED DEPTH
RWD DUAL PROP RGD NPFD 10/08/90 #11-12 0.0-11636
TELECO 2" MENORY 1:600 TRUE VERTICAL DEPTH
RWD DUAL PROP RGD NPFD 10/08/90 #11-12 0.0-11636
TELECO 2" MENORY 1:240 TRUE VERTICAL DEPTH
.
.
1!
*** G EOS/ARCO/EXXON/ARCHIVES ONLY.
STATE ONLY:
Magnetic Single Shot Directional Survey Date:
Gyroscopic Directional Date:
Inforation Control
Well Records LR 2-1
J..Dietz/S. McCurry
Job#:
Job#:
? , STATE OF ALASKA 0 t
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
BP Exploration 90-127
3. Address 8. APl Number
P. 0. Box 196612, Anchorage, Alaska 99519-6612 s0- 029-22088
4. Location of well at surface 9. Unit or Lease Name
At Top Producing Interval ~ 10. Well Number
1848'SNL, 1110' WEL, SEC. 27, T12N, R12E
At Total Depth ~ ~.~ '~ ,! ! ~, ?",~_rl~_j Prudhoe Bay Field/Prudhoe Bay Pool
1516' SNL, 1156 WEL, SEC. 27, T12N, R12E
5~ Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Sedal No.
64.56' KBE I ADL 28258
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions
9-23-90 10-10-90 11-06-90I N/A feet MSLI One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+'I'VD 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
11634'MD/9224'TVD 11583'MD/9189'TVD YES [] NO []I 2109 feet MD I 1900'
22. Type Electric or Other Logs Run
CNL/GR
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE w-r. PER FT. GRADE TOP BO'I-rOM I-K~E SIZE CEMENTING RECORD AMOUNT PULLED
.,
20" Surface 110
13-3/8" 68# L-80 Surface 2702 16" 2255 cu ft Arcticset III & II
9-5/8" 47# NTSO-S Surface 10928' 12-1/4 1515 cufl Class G
7" 26# L-80 10682' 11624' 8-1/2 266 cu ft Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET IMDI PACKER SET (MD}
Schlumberger 3-3/8" @ 4 spf 4-1/2" 12. 6 # 10 714' 10625'
MD TVDSS L-80
11165'- 11172' 8832'-8837, 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
11182'- 11294' 8844' - 8923' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11304'- 11354' 8930'-8965' 13-3/8"9-5/8" Freeze Protect with 144 bbls Diesel
11364' - 11386' 8972' - 8987' annulus
27. PRODUCTION TEST
D'ate First Production IMethod of Operation (Flowing, gas lift, etc.)
12-4-90 I FIowin~7
Date of .Test Hours Tested PRODUCTION FOR DIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO
~ TEST PERIOD I~
I
Flow Tubing Casing Pressure CALCULATED..~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
i28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
RECEIVED
FEB - 4 t991
Form 10-407
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
Submit in duplicate
29. $0.
GEC~Cx21C MARKERS -"~RMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Sag 10949 8746
Schublik A 11017 8793
Zone 4 11165 8896
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
/
Signed . Title rngirlcer Date. //----';¢~'--
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Monday. September 24, 1990
-
WELL: S-23 (42-27-12-12) AP! No.
5O-O29-22O88
Day: 2
Depth at 0600 Hrs. =
48 Hour Footage =
2,6O0 Ft.
2,600 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nab, ors Rig #18-E
125273
Current Operation' Drilling
,,Summary_ of Last 48 Hours:
Accepted rig at 22:00 hrs on 9-22'90.
Drilled the 16" hole to 2600'.
Mud Tvoe Mud Weiaht
Spud 9.4 #/gal
Viscosity p V YP
105 Sec. 43 16
Fluid Loss Solids
12.0 cc 9%
Temo
oF
Survey Deoth Anale Direction
--
TVD
N (+)/S (-) E(+)/W(-)
Section Coordinate Coordinate
Dog Leg
o/100'
Reviewed By: ,¢S
RECEIVED
FEB - 4 t99t
Alaska 0il & Gas Cons. Commission
Anchorage
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Tuesday. September 25. 1990
-
WELL: S-23 (42-27-12-12) APl No.
50-029-22088
Day' 3
Depth at 0600 Hrs. --
24 Hour Footage =
21725 Ft.
12,5 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
.Nabor$ Rig #18-E
125273
Current Operation' POH
Summary_ of Last 24 Hours'
Drilled the 16" hole to 2725'. Ran 13-3/8" casing to 2125' but would not go. POH with casing and
RIH to ream the hole to 17-1/2".
Mud 'l'_v.oe Mud Weight Viscosity ? ¥ YP ~ Solids TemD
Spud 9.3 #/gal 255 Sec. 43 61 12.0 cc 8% 56 °F
Survey Depth Angle Direction TVD
N (+)/S f-) E(+)/W(-) ...Dog Leg
Section Coordinate Coordil3ate °/100'
Reviewed By: SS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Wednesday. September 26. 1990
WELL: S-23 (42-27-12-12), APl No.
,,50-.029-22088
Day: 4_
Depth at 0600 Hrs. =
24 Hour Footage =
2,150 Ft.
OFt.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #18-E
125273
Current Operation' POH
Summary_ of Last 24 Hours:
Reamed the hole with 17-1/2" hole opener (110'-2150').
POH
Mud T_voe Mud Weight Viscosity
Spud 9.11 fi/gal 210 Sec.
PV yp Fluid Loss ~ TemD
34 62 12.0 cc 8% °F
Survey D..EEtb Angle i.[~..¢..6.d.O~ TV.l:;)
N (+)/S (-) E(+)/W(,) Dog Le.g
Section Coordinate Coordinate °/100~
Reviewed By: SS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Thursday. Seotember 27. 1990
WELL: $-23 (42-27-12-12~ AP! No.
50-029-22088
Day' 5
Depth at 0600 Hrs. =
24 Hour Footage =
2.735 Ft.
10 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Ria #18-E
125273
Current Operation' WOC
Summary_ 0f Last 24 Hours:
Reamed the 16" hole with 17-1/2" hole opener from 2150' to 2735'.
casing.
Ran and cemented 13-3/8"
Mud Tvoe Mud Weiaht Viscosity
Spud @.4 #/gal 185 Sec.
Survey ~ Angle J~:.e.a~,JJ.Q~ TVD
P ¥ YP .F~iLC[_J.Q~ Solids Temo
31 45 12.0 cc 8% °F
N (+)/S (-) E(+)/W(-) Dog Leg
Section Coordinate Coordinate °/100'
Reviewed By: $$
BP
EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Friday. Seotember 28. 1990
WELL: $-23 (42-27-12-12) APl No.
5O-O29-22O88
Day: 6
Depth at 0600 Hrs. =
24 Hour Footage =
2.950 Ft.
215 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabor$ Rig #18-E
125273
Current Operation' Drilling
Summary of Last 24 Hours:
-
Drilled cement inside the 13-3/8" casing.
Drilled the 12-1/4" hole to 2950'.
Mud T_vpe Mud Weight
Low Solids 8.9 #/gal
Viscosity P V YP
50 Sec. 10 27
Fluid Loss Solids Temo
15.0 cc 4% °F
Survey
Tvo
N (+)/S (-) E(+)/W(-), Dog Leg
Section Coordinate goordinate °/100'
Reviewed By: $S
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Monday, October !. 1990
WELL: S'23 (42-27-12-12). AP! No.
50-029-22088
Day: 9
Depth at 0600 Hrs. =
72 Hour Footage =
61515 Ft.
3.565 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #18-E
125273
Current Operation: Drilling
Summary of Last 72 Hours:
Drilled the 12-1/4" hole to 6515'.
Mud Tvoe
Low Solids
Mud Weight
9.5 lC/gal
Viscosity
36 Sec.
p V. YP Fluid Loss Solids
6 7 8.0 cc 9%
Temo
oF
Survey Deoth
Anale
--
'l'VO
N (+)/S (-) E(+)/W(-)
Section Coordinate Coordinate
DOg Leg
°/100!
Reviewed By: SS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: .PRUDHOE BAY UNIT
As of 0600' Hrs. Tuesday, October 2. 1990
WELL: S-23 (42-27-12-12~ APl No.
50-029-22088
Day: 1,0
Depth at 0600 Hrs. =
24 Hour Footage =
7.630 Ft.
1,115 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #18-E
125273
Current Operation' POH
Summary of Last 24. Hours'
Drilled the 12-1/4" hole to 7630'. POH for bit change.
Mud Tv0e Mud Weight Viscosity
Low Solids 9.7 Cf/gal 39 Sec.
PV .YP. Fluid Los~ ~ Temo
1 0 1 5 8.0 cc 1 1% °F
Survey Depth ..Angle J;~[.E.e. flJ. Lg~ TVQ
N (+)/S (-) E(+)/W(-), Dog Leg
Sectign Coordinate Coordinate °/100'
Reviewed By: SS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs...Wednesday. October 3. 1990
WELL: S-23 (42-27-12-12) AP! No.
50-029-22088
Day: !,1
Depth at 0600 Hrs. =
24 Hour Footage =
8,472 Ft.
8,42 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #18-E
125273
Current Operation: Drilling
Summary of Last 24 Hours:
Drilled the 12-1/4" hole to 8472'.
Mud Type
Low Solids
Mud Weight
9.9 Cf/gal
,Viscosity
36 Sec.
pv YP Fluid Loss Solids
8 5 11.0 cc 11%
Temp
76 OF
Survey Death
Anale
--
'T'VD
N (+)/$ (-) E(+)/W(-)
Section Coordinate Coorclinate
Dog Leg
o/100'
Reviewed By: ~
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Thursda, y, OctOber 4, 1990
WELL: S-23 (42-27-12.12), APl No.
5O-O29-22O88
Day: 12
Depth at 0600 Hrs. =
24 Hour Footage =
9,250 Ft.
778 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #18-E
125273
Current Operation: Drilling
.Summary of Last 24, Hot~r,,s:,
Drilled the 12-1/4" hole to 9250'.
Mud Type
Low Solids
Mud Weioht
--
9.9 #/gal
Viscosity
38 Sec.
P V YP.. i~L~Ij.Q_L¢_,~ Solids Temo
8 10 11.0 cc 11% 80 °F
Survey Deoth
Anale
.0irection
TVD
N (+)/S (-) E(+)/W(-) Dog Leg
Section Coordinate Coordinate °/100'
Reviewed By: SS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: P. RUDHOE BAY UNIT
As of 0600 Hrs. Fddav. October 5. 1990
WELL: $-2~ (42-27-12-12) AP! No.
50-029-22082
Day: 13
Depth at 0600 Hrs. =
24 Hour Footage =
9.725 Ft.
47,5 Ft.
Current Operation' Drilling 12-1/4" hole.
Summary_ of Last 84 Hours'
Ddlled and surveyed 12-1/4" hole to 9725'.
Rig:
ArE Number:
ArE Amount =
Current Costs =
Estimated Final Cost =
Na, bor~, Rig #,! 8-E
125273
Mud Tvoe Mud Weiaht Viscosity
Low Solids 9.8 #/gal 38 Sec.
P V YP F,!uid Loss Solids
8 11 6.8 cc 10%
N (+)/S (-) E(+}RV(-)
Section Coordinate ,Coordinate
TemD
76 OF
Dog Leg
°I1OO'
Reviewed By: SS
RECEIVED
FEB - 4 t99~
Alaska 0il & Gas Cons. Commission
Anchorage
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Mond~_v. October 8. 1990
WELL: $-2~ (42-27-12-12) AP! No.
50-029-22088
Day: 1.6
Depth at 0600 Hrs. = 10,942 Ft.
72 Hour Footage = 1,217 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabor$ Rig #18-E
125273
Current O0erati(~n: RIH with 9-5/8" casing.
Summary of Last 72 Hours;
-
Ddiled the 12-1/4" hole to 10942'. RIH with 9-5/8" casing
Mud Ty0e Mud Weight Viscosity
Low Solids 9.8 #/gal 41 Sec.
pv YP Fluid Loss Solids
13 1 0 6.2 cc 10%
Temp
92 OF
Angle .QJ.[.e..c,..t. Lg~ TVD
N (+)IS (-) E(+)/W(-)
Section Coordinate Coordinate
Dog Leg
o/100'
Reviewed By' SS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT:
As of 0600 Hrs. Tuesday. October 9. 1990
WELL: $-~3, (42-27-12-]2),
Day: !.7
Depth at 0600 Hrs. =
24 Hour Footage =
10,942 Ft.
OFt.
PRUDHOE BAY UNIT
AP! No.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
50-029-22088
Nabors Rig #18-E
125273
Current Operation: RIH with 8-1/2" bit.
Summary of Last 24 Hours:
Ran and cemented the 9-5/8" casing at 10928'.
Running in hole with 8-1/2" bit.
Mud Type Mud Weiaht
Low Solids 8.5 #/gal
Viscosity BV yp Fluid Loss Solids
30 Sec.~- 1 1 cc 1%
Temo
oF
Survey Deoth Anale ~
--
N (.+)IS (-_) E(+)/W(-)
Section Coordinate Coordinate
Dog Leg
01100'
Reviewed By: SS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Thursday. October 11. 1990
WELL: S-23 (42-27-12-12) APl No.
50-029-22082
Day: ! 9
Depth at 0600 Hrs. -- 11.634 Ft.
24 Hour Footage = 1 41 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
,.N,,abors Rig #18-E
12527:~
Current OperatiQn' POH for logs.
Summa~ry Qf ,Last ,..24 Hours'
Drilled the 8-1/2" hole to 11,634'. Attempted logs. Couldn't get past 10,937'. Made cond. trip.
Mud'r'_voe Mud Weight Viscosity p V yp Fluid Loss Solids
Low solids 8.9 #/gal 35 Sec~. 4 6 11.0 cc 4.5%
Temp
90 OF
Survey De.otb Angle D.~ TVD
N (+)/S (-) ,E(+)/VV(-)
Section Coordinate Coordinate
Dog Leg
o/100'
Reviewed By: /¢~
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Wednesday. October !0.1990
WELL: $-23 (42-27-12-12) AP! No.
50-029-22088
Day: 1~
Depth at 0600 Hrs. = 11,493 Ft.
24 Hour Footage = 551 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nab0r$ Rig #18-E
12.5273_
Current Ooeration: Drilling
Summary of Last 24 Hours:
Drilled out cement. Drilled the 8-1/2" hole to 11493'.
Mud Type Mud Weiaht Viscosity
Low Solids ' 8.9 #/gal 36 Sec.
P V YP IE!IzLd_t.9_~ Solids Temo
5 6 11.0 cc 5% 90 °F
Survey Deoth /~ngle g.J.~73,[QJ3.
N (+)/S (-) E(+¥W(-) Dog Leg
TVD Section Coordinate Coordinate °/100'
Reviewed By: SS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHQE, BAY UNIT.
As of 0600 Hrs. Friday, October 12. 1990
WELL: S-23 (42-27-!2,-!2~ APl No.
~.0-029-22082
Day: 2Q
Depth at 0600 Hrs. = !.1.634 Ft.
24 Hour Footage = O Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabor$ Rig, #18-E
125273
Current Ooeration' CBU.
St~mma, ry of Last 2.4., Hours:
Ran logs. Couldn't get past bridge at 10,937'.
Logged well with MWD.
Mud 'f'vDe Mud Weiaht
- . v
Low Solids 8.9 #/gal
.V. jc.c,,~.L~ P V YP
65 Sec. 8 10
lJ~_!.u.i.~LJ.Q.~ Solids Temp
7.0 cc 4.5% 90 °F
Survey ~ Angle
N (+)/S (r) E(+)/W(,) Dog, Leg
Section Coordinate Coordinate °/100'
Reviewed By:
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Monday. October 15. 1990
WELL: S-23 (42-27-12-12) AP! No.
50-029-22088
Day: 23
Depth at 0600 Hrs. = 11,624 Ft.
72 Hour Footage = 0 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Ria #18-E
--
125273
Current Operation: Running casing logs.
Summary of Last 72 Hours'
Ran and cemented 7" liner at 11624'. Cleaned out cement.
casing logs.
Displaced mud with brine.
RIH with
Mud 'Type Mud Weight Viscosity P ¥,
Brine 8.5 #/gal Sec.
Survey Deoth Angle Direction TVD
yp Fluid Loss Solids Temo
cc °F
N (+)/S (-) Ef+)/Wf-)_ Dog Leg
Section Ooordinate Coordinate °/100'
Reviewed By: SS
REEEIVED
FEB - 4 t991
Alaska.Oil & Gas Cons. Commission
~chorage
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Tuesday. October 16. 1990
WELL: $-23 (42-27-12-12) APl No.
,~0.-029-22088
Day: 2.4
Depth at 0600 Hrs. =
24 Hour Footage =
11,624 Ft.
_QR.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #18-E
125273
Current Operation: Install X-Mass tree.
Summary 0f Last 24 Hours'
Completed casing logs. Ran 4-1/2" tubing.
Mud Type Mud Weight
Brine 8.5 #/gal
~iscosity
Sec.
pV yp Fluid Loss Solids
CC
Temp
oF
Survey Depth Angle Direction
TVD
N (+)/S (.) E(+)/W{-)
~ Co0rCnate Coordinate
Dog Leg
o/100'
Reviewed By: SS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Wednesday. October 17. 1990
WELL: S-23 (42-27-12-12) AP! No.
50-029-22088
Day' 25
Depth at 0600 Hrs. = 11,624 Ft.
24 Hour Footage = O Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
NabQr~ Rig #18-E
125273
Current Operation'
Summa _ry of Last 24 Hour~;:
Tested wellhead and tubing packer ok. Placed Diesel in the tubing annulus. Released rig at 13:00
hrs.
MudTy.oe Mud Weight Viscosity PV YP Fluid Lo~ Solids Temo
#/gal Sec. cc °F
N (+)/S (-) E{+),/W(-) Dog Leg
Survey Death Angle Direction TVD Section Coordinate Coordinate °/100'
Reviewed By: SS
WELL No. S-23
LAT. - 70'21'12.988"
LONG. '- 149'01'58.146"
Y = 5,979,855.08 A.S.P.
X -- 619,105.67 ZONE 4
1631' FROM NORTH UNE
9¢5' FROM WEST LINE
(MILES)
SURVEYOR'S CERTIFICATE
I hereby certify that I em properly
registered and licensed to practice
land surveying in the State of Alaska,
and that this plat represents a
survey made by me Or under my
supervision, and that all dimensions
and other details :~re Correct. .
Date:.SEPT.'i'13,''t990 iLS'No. '~ 7535
~- Registered Land ~rVeyor
WELL PAD "S"
WELL No. S-23 ASBUILT
LOCATED IN PROTRACTED SECTION ,35,
TOWNSHIP 12 NORTH, RANGE 12 EAST,
UMIAT MEREDIAN, ALASKA
SURVEYED FOR:
B.P. EXPLORATION
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
'' St.l~O BY:
ARCTIC SLOPE CONSULTING OROUP
6700 ARCTIC SPUR ROAD
ne,~ aY' ANCHORAGE, ALASKA 99518
KVc 9/~o/9o
26
35
35
26
943'
·
' 28 7 8 9
...
o o
10 11
I
T12N
T11N
NO SCALE
WELL PAD "S"
55
35
2
PADS-23X
SURVEYED BY:
ARCTIC SLOPE CONSULTING CROUP
6700 ARCTIC SPUR ROAD
ANCHORAGE, ALASKA 99518
DRAWN BY: KMC IDATE: 9/13/90
I
i i
SURVEYED FOR:
B.P. EXPLORATION
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
WELL No. S-25 ASBUILT
LOCATED IN PROTRACTED SECTION .35,
TOWNSHIP 12 NORTH, RANGE 12 EAST,
UMIAT MEREDIAN, ALASKA
Teleco Oilfield Sf es Inc.
6116 Nielson way.
Anchorage, AK
99518
(907) 562-2646
October 19, 1990
JOB ~781
BP EXPLORATION (ALASKA) INC.
WELL: S-23
PRUDHOE BAY
RIG: NABORS 1SE
Attached please find a copy of the computer calculated MWD
directional surveys for the above mentioned well.
Teleco appreciates this opportunity to provide service to BP
Exploration (Alaska) Inc.
Teleco is committed to providing the highest quality MWD Service
and we would welcome any comments or questions concerning t.hese
surveys or any of our other services.
Sincerely,
Eric $. Brown
Field Operations Supervisor
ESB/ng
Enclosures
r)ate ~ oO
RE .EIYED
Alaska Oil & Gas Cons.
Anchorage
i
A S~NAT COMPANY
TELECO OILFIELD SERVICES
SURVEY CALCULATIONS
Date 18 OCT 90
'Company: BP EXPLORATION
~Well: S-23
Location: PRUDHOE BAY
Rig: NABORS 18E
TELECO Job #
Grid Correction:
Magnetic Declination:
Total grid correction:
Proposed Direction:
781TAK
0.0°
30.0°
30.0°
340.8°
MINIMUM CURVATURE CALCULATION
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
*******************************************************************************************************
TIE-IN TO SURFACE
0 0 0.0 167.0 0.01 0.01 0.01N 0.01E 0.01 N 45.00E 0.00
TELECO MWD SURVEYS
474 474 0.8 167.0 474.00 -3.12 3.05S 0.72E 3.14 S 13.21E 0.16
987 513 0.3 354.0 986.98 -5.37 5.21S 1.35E 5.38 S 14.57E 0.19
1495 508 0.3 245.0 1494.98 -4.40 4.58S 0.23E 4.58 S 2.93E 0.08
2005 510 0.5 265.0 2004.97 -3.97 5.24S 2.99W 6.03 S 29.71W 0.05
PAGE 1
Compan¥~ Bp EXPLORATION, Well: S,23, Location: PRUDHOE BAY, Riq: NABORS 18E
Meas Course True Vertical Coordinates Closure Dog Leg
..~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
2504 499 0.3 64.0 2503.97 -3.30 4.95S 4.18W 6.48 S 40.17W 0.15
2748 244 0.7 261.0 2747.96 -2.98 4.95S 5.18W 7.16 S 46.25W. 0.39
2841 93 2.2 311.6 2840.93 -1.32 3.86S 7.07W 8.05 S 61.39W 1.98
2934 93 4.4 319.0 2933.77 3.55 0.02N 10.75W 10.75 N 89.88W 2.40
3039 105 6.5 320.7 3038.29 12.88 7.66N 17.15W 18.79 N 65.93W 2.01
~.3135 96 8.5 321.1 3133.47 24.66 17.39N 25.05W 30.49 N 55.23W 2.08
3230 95 10.9 326.4 3227.10 39.97 30.34N 34.43W 45.89 N 48.62W 2.69
3324 94 12.8 329.9 3319.10 58.81 46.75N 44.57W 64.59 N 43.64W 2.16
3419 95 15.8 337.6 3411.15 82.06 67.82N 54.78W 87.18 N 38.93W 3.73
3513 94 18.7 337.6 3500.91 109.89 93.59N 65.40W 114.18 N 34.95W 3.09
3607 94 21.2 338.0 3589.26 141.92 123.28N 77.51W 145.63 N 32.16W 2.66
3700 93 23.3 337.3 3675.34 177.08 155.85N 90.91W 180.42 N 30.26W 2.28
3796 96 25.6 336.2 3762.72 216.71 192.34N 106.61W 219.91 N 29.00W 2.44
3890 94 28.8 334.5 3846.32 259.47 231.37N 124.56W 262.77 N 28.29W 3.50
PAGE 2
Company: BP EXPLORATION, Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E
'Meas Course True Vertical Coordinates Closure Dog Leg
.~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
~eet feet deg deg feet feet feet feet feet deg deg/100'
3985 95 31.7 335.2 3928.37 307.06 274.69N 144.88W 310.56 N 27.81W 3.08
4080 95 34.7 334.8 4007.86 358.81 321.83N 166.87W 362.52. N 27.41W 3.17
4174 94 37.4 336.2 4083.85 413.88 372.17N 189.79W 417.77 N 27.02W 3.00
4269 95 40.3 335.9 4157.83 473.26 426.62N 213.98W 477.28 N 26.64W 3.06
4365 96 42.0 335.5 4230.11 536.19 484.20N 239.98W 540.41 N 26.36W 1.80
4460 95 44.8 335.9 4299.12 601.20 543.69N 266.83W 605.64 N 26.14W 2.95
4554 94 46.8 336.2 4364.65 668.36 605.28N 294.19W 672.98 N 25.92W 2.14
4650 96 46.8 336.2 4430.36 738.11 669.31N 322.43W 742.92 N 25.72W 0.00
4743 93 47.0 336.6 4493.90 805.82 731.54N 349.61W 810.79 N 25.54W 0.39
4838 95' 47.5 336.6 4558.38 875.40 795.56N 377.32W 880.51 N 25.37W 0.52
4933 95 48.3 337.3 4622.07 945.73 860.42N 404.92W 950.94 N 25.20W 1.00
5028 95 49.0 337.6 4684.83 1016.93 926.29N 432.27W 1022.19 N 25.02W 0.78
5120 92 49.2 337.6 4745.06 1086.36 990.59N 458.77W 1091.67 N 24.85W 0.21
PAGE 3
Compa.n.¥:. Bp EXPLORATION, Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E
Meas Course True Vertical Coordinates Closure Dog Leg
depth Length Incl Azi Vert. Dp. Section N/S 'E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
5216 96 50.7 338.3 4806.83 1159.75 1058.70N 486.35W 1165.07 N 24.67W 1.66
5311 95 51.4 338.7 4866.55 1233.58 1127.44N 513.43W 1238.84 N 24.48W 0.81
5403 92 51.7 339.0 4923.76 1305.58 1194.64N 539.42W 1310.77 N 24.30W 0.42
5495 92 50.5 338.0 4981.53 1377.12 1261.26N 565.64W 1382.29 N 24.15W 1.55
5590 95 49.7 338.7 5042.47 1449.94 1329.00N 592.52W 1455.10 N 24.03W 1.01
.5685 95 49.7 339.4 5103.91 1522.35 1396.66N 618.43W 1527.45 N 23.88W 0.56
5780 95 48.5 339.0 5166.11 1594.13 1463.79N 643.92W 1599.16 N 23.74W 1.30
5876 96 48.3 339.0 5229.85 1665.88 1530.81N 669.63W 1670.87 N 23.63W 0.21
5971 95 47.8 338.7 5293.36 1736.50 1596.71N 695.12W 1741.46 N 23.53W 0.58
6066 95 47.4 338.3 5357.41 1806.59 1661.98N 720.83W 1811.57 N 23.45W 0.52
6160 94 46.8 338.0 5421.40 1875.38 1725.90N 746.45W 1880.40 N 23.39W 0.68
6254 94 46.1 338.3 5486.17 1943.43 1789.13N 771.80W 1948.51 N 23.33W 0.78
6337 83 46.4 338.3 5543.56 2003.33 1844.84N 793.97W 2008.44 N 23.29W 0.36
PAGE 4
Company: BP EXPLORATION, Well: S-23, Location: PRUDHOE..BAY, Riq: NABORS 18E
Meas Course True Vertical Coordinates Closure Dog Leg
~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
*******************************************************************************************************
6443 106 46.1 337.6 5616.86 2079.81 1915.81N 822.72W 2084.99 N 23.24W 0.55
6536 93 46.4 338.0 5681.17 2146.90 1978.01N 848.09W 2152.16 N 23.21W 0.45
6630 94 46.8 337.6 5745.76 2215.10 2041.25N 873.89W 2220.45 N 23.18W 0.53
6722 92 46.8 337.6 5808.74 2282.06 2103.25N 899.45W 2287.51 N 23.15W 0.00
6817 95 46.4 337.3 5874.01 2350.97 2167.00N 925.92W 2356.53 N 23.14W 0,48
~6913 96 46.7 337.6
7009 96 46.8 336.8
7102 93 46.8 335.9
5940.03 2420.54 2231.36N 952.65W 2426.22 N 23.12W 0.39
6005.81 2490.33 2295.82N 979.74W 2496.14 N 23.11W 0.62
6069.48 2557.91 2357.92N 1006.94W 2563.93 N 23.12W 0.71
7196 94 46.9 336.6 6133.76 2626.28 2420.69N 1034.56W 2632.50 N 23.14W 0.55
7290 94 47.1 336.'6 6197.87 2694.84 2483.79N 1061.86W 2701.25 N 23.15W 0.21
7383 93 46.8 336.2 6261.36 2762.60 2546.06N 1089.07W 2769.21 N 23.16W 0.45
7479 96 46.8 335.9 6327.07 2832.34 2610.02N 1117.48W 2839.18 N 23.18W 0.23
7575 96 46.9 336.6 6392.73 2902.16 2674.12N 1145.68W 2909.22 N 23.19W 0.54
PAGE 5
_Company: BP EXPLORATION,...Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E
Meas Course True Vertical Coordinates Closure Dog Leg
~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
~eet feet deg deg feet feet feet feet feet deg deg/100'
7669 94 46.6 335.9 6457.14 2970.41 2736.79N 1173.26W 2977.68 N 23.20W 0.63
7763 94 46.1 336.6 6522.02 3038.21. 2799.05N 1200.65W 3045.69 N 23.22W 0.76
7857 94 45.7 336.2 6587.44 3105.51 2860.90N 1227.67W 3113.19 N 23.23W 0.52
7953 96 45.6 336.2 6654.54 3173.94 2923.71N 1255.38W 3181.83 N 23.24W 0.11
8046 93 45'2 335.5 6719.84 3239.91 2984.14N 1282.47W 3248.04 N 23.26W 0.69
...8141 95 44.6 335.5 6787.14 3306.68 3045.16N 1310.28W 3315.09 N 23.28W 0.63
8235 94 43.8 335.2 6854.53 3371.92 3104.72N 1337.61W 3380.60 N 23.31W 0.88
8332 97 43.8 336.2 6924.54 3438.79 3165.91N 1365.23W 3447.73 N 23.33W 0.71
8426 94 44.1 336.2 6992.21 3503.81 3225.60N 1391.56W 3512.96 N 23.34W 0.32
8522 96 44.0 336.9 7061.21 3570.38 3286.84N 1418.13W 3579.72 N 23.34W 0.52
8618 96 43.9 336.6 7130.31 3636.85 3348.06N 1444.43W 3646.35 N 23.34W 0.24
8712 94 43.6 337.3 7198.22 3701.70 3407.87N 1469.88W 3711.35 N 23.33W 0.61
8807 95 43.9 337.6 7266.84 3767.29 3468.54N 1495.07W 3777.04 N 23.32W 0.38
PAGE 6
Company: BP EXPLORATION, ...... Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E
Meas Course True Vertical Coordinates Closure Dog Leg
~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg .deg/100'
8902 95 43.9 338.3 7335.29 3833.08 3529.59N 1519.80W 3842.89 N 23.30W 0.51
8997 95 44.3 339.0 7403..52 3899.14 3591.17N 1543.86W~ 3908.97 N 23.26W 0.67
9033 36 44.6 338.7 7429.22 3924.34 3614.68N 1552.96W 3934.16 N 23.25W . 1.03
9123 90 45.4 339.4 7492.86 3987.95 3674.12N 1575.71W 3997.75 N 23.21W 1.05
9219 96 46.1 339.7 7559.84 4056.70 3738.55N 1599.73W 4066.43 N 23.17W 0.76
9313 94 47.3 339.4 7624.31 4125.09 3802.64N 1623.64W 4134.77 N 23.12W 1.30
9409 96 47.9 340.4 7689.04 4195.97 3869.22N 1648.00W 4205.56 N 23.07W 0.99
9504 95 48.5 341.1 7752.36 4266.79 3936.08N 1671.34W 4276.22 N 23.01W 0.84
9599 95 49.5 341.5 7814.69 4338.48 4003.99N 1694.33W 4347.72 N 22.94W 1.10
9693 94 50.3 341.1 7875.24 4410.38 4072.10N 1717.38W 4419.43 N 22.87W 0.91
9787 94 50.5 341.1 7935.15 4482.81 4140.62N 1740.84W 4491.69 N 22.80W 0.21
9882 95 49.2 341.5 7996.41 4555.42 4209.40N 1764.12W 4564.12 N 22.74W 1.41
9977 95 48.6 342.9 8058.86 4626.98 4277.55N 1786.01W 4635.44 N 22.66W 1.28
PAGE 7
Company: BP EXPLORATION, Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E
Meas Course True Vertical Coordinates Closure Dog Leg
,~epth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
*******************************************************************************************************
10072 95 48.3 343.2 8121.87 4698.02 4345.56N 1806.74W 4706.19 N 22.58W 0.39
10167 95 47.7 343.9 8185.44 4768.54 4413.27N~ 1826.73W 4776.39 N 22.49W 0.84
10262 95 47.0 343.9 8249.79 4838.31 4480.41N 1846.11W 4845.84 N 22.39W 0.73
10324 62 46.2 344.3 8292.39 4883.29 4523.73N 1858.45W 4890.61 N 22.33W 1.39
10418 94 46.3 345.0 8357.39 4951.04 4589.21N 1876.42W 4958.01 N 22.24W 0.56
10514 96 46.1 345.4 8423.84 5020.12 4656.20N 1894.12W 5026.72 N 22.14W 0.36
10608 94 46.4 346.4 8488.84 5087.75 4722.06N 1910.66W 5093.96 N 22.03W 0.83
10703 95 46.2 347.5 8554.48 5156.04 4788.97N 1926.17W 5161.81 N 21.91W 0.86
10799 96 46.1 349.6 8620.99 5224.63 4856.81N 1939.91W 5229.90 N 21.77W 1.58
10872 73 45.9 351.0 8671.70 5276.42 4908.57N 1948.75W 5281.26 N 21.65W 1.42
10960 88 46.3 353.8 8732.72 5338.52 4971.41N 1957.13W 5342.78 N 21.49W 2.33
11054 94 46.4 354.1 8797.61 5404.75 5039.05N 1964.30W 5408.37 N 21.30W 0.26
11147 93 45.4 354.8 8862.33 5469.65 5105.52N 1970.76W 5472.68 N 21.11W 1.20
PAGE 8
Company.: BP EXPLORATION, Well: S-23, Location: PRUDHOE BAY, Riq: NABORS 18E
Meas Course True Vertical Coordinates Closure Dog Leg
depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
11242 95 45.3 354.5 8929.09 5535.27 5172.81N 1977.06W 5537.75 N 20.92W 0.25
11336 94 45.7 354.1 8994.98 5600.46 5239.52N 1983.72W 5602.48 N 20.74W 0.52
11400 64 45.9 356.6 9039.60 5644.86 5285.25N 1987.44W 5646.57 N 20.61W 2.82
PAGE 9
TE _-CO OClfield SePvic. ~
PLAN VIEW
6400
BP EXPLORATION
S-23
PRUDHOE BAY
NABORS ¢8E
JOB# 781TAK/O0
SCALE:
~ inch = BO0
'~400 i
~1242
~0960 '
~0703
~.04:1.8
:1.0 ! 67
9882 ' ~
9599 ' _~_
93't3 ' _~
8997 ' ~
87 ~.2 ' ~
8426 ' ~
8~4~- ' ~
7857 ' ~
7290 ' ~
6~22 ' ~
6443 ' ~
6~_60 ' ~
5876 ' ~
53~ ' ~
5028
4743
4 ~74
~7~6,
feet
5600
4800
4O00
3200
2400
1600
800
8OO
4000
3200
2400
WEST
·
8OO
8OO
2O0O
4000
.~5000
08000
>10000
12000
~4000
15000
18000
-lO00
,,
;~LECO Oilfield Sepvi~
VER T I C AL PROJECT T ON
lO00 3000 5000 7000 9000 11000
474 ' .75 deg
987 ' .25 deg
i495 ' .25 deg
2005 ' .5 deg
2504 ' .25 deg
2934 ' 4.4 deg
BP EXPLORATION
S-23
PRUDHOE BAY
NABORS 1 BE
JOB# 78iTAK/O0
L83419 ' 15.8 deg SCALE:
so · 28.8 ~g 1 inch = 2000 feet
460 . 44.8 deg '
:t,k~20 ' 49.2 deg ,
78o ' 48.5 deg
~%~443 " 46.1 deg
% 102 · 46.8 deg
~763' 46., deg
~8~32' 43.8 deg
· ~902 ' 43.9 deg
04 ' 48.5 deg
~?i67' 47.7 deg
VERTICAL SECTION (ft)
·
ORIGINA~
?o
J~ UIDANcE
~ ONTINUOus
~OOL
SUB. SURFA C£
DIRECTIONAL
SURV£y
Company
~ ECEIVED
~ FEB - 4 t991 ~
15-0ct-90
KOHRZNG
* SCHLUMBERGER *
GCT DIRECTIONAl SURVEY
CUSTDMER LISTING
FOR
BP EXPLORATION
S-23 (4Z-IT-II-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
SURVEY DATE: 15-OCT-gO
ENGINEER: SCHWARTZ
METHODS OF COMPUTATION
TOOL LOC~TION: TANGENT[4L- AVERAGED DEVIATION AND AZIMUTH
INTERPOLATION: LINEAR
VERTICAL SECTION: HORIZ. DIST. P~OJECTED ONTO A TARGET AZIMUTH OF NORTH 21 DEG 31 MIN W~ST
Cg~PUTATIgN DATE: 30-OCT-90 PAGE
BP EXPLORATION
S-23 (42-27-1Z-12)
PRUDHDE BAY
NORTH SLOPEr ALASKA
INTERPOLATEO VALUES FgR EVEN 100
TRUE SUB-SEA
MEASURED VER'TICAL VERTICAL
DEPTH D=PTH~_ DEPTH
0.00 0,00 -6¢,56
100,00 100.00 35,¢4
200,00 200.00 135,44
300.00 300.00 235.44
400.00 400.00 335.44
500°00 500.00 435.44
600.00 600.00 535.44
7OD,D0 700.00 635.44
800.00 800.00 735.44
900.00 900.00 835.44
1000,00 lO00.OO
1100,00 1100.00
,lZO,O.O0 1200,00
1300.00 1300.00
1400.00 1400.00
1500,00 1500,00
1600,00 1500,00
1700.00 1700.00
1800.00 1800.00
1900.00 1899.99
ZO00.O0 1999.98
2100.00 2099.98
2200.00 2199.98
2300.00 22'99,98
2400.00 2399.99
2500.00 2499.98
2600,00 2599.98
2700,90 2699.95
Z800.O0 2799.98
2900.00 2899.91
3000,00 2999,62
3100,00 3098,95
3200,00 3197,75
3300.00 3295.88
3400.00 3393.03
3500.00 34,98.80
3600.00 3592.98
3700.00 3675.65
3800.00 3766.39
3900.00 3855.03
D,~TE OF SURVEY:
KELLY BUSHING ELEVATION:
~EET OF MEASURED DEPTH
935.44
1035.44
1135.44
1235.44
1335.44
1435.44
!535.44
1635..44
1735.44
1835.43
COURSE VER'TIC4L DOGLEG
DEVIATION AZIMUTH SECTION SEVERITY
DEG M'IN DEG MIN FEET OEG/IO0
1935.42
2035.42
2135.42
2235.42
2335.42
2435.42
2535.42
2635.42
2735.42
2~35.35
0 0 N 0 g E 0.00
0 14 S 54 4'I W 2.06
0 16 S 53 55 E -0.24
0 16 S 16 58 E -0.53
0 9 S I0 15 E -O.~Z
0 11 S 24 43 E -1.38
0 13 S 15 33 E -I,71
0 9 S 2.3 15 W -1.86
0 3 N 16 28 W -1,98
0 4 S 49 19 ,E -2,02
2935.06
3034.39
3133.19
3Z31.32
3328.47
3424.24
3518.42
3611.09
3701.83
3790.47
0 3 S 75 4'3 W -1.98
0 3 N 36 42 E -2.04
0 4 S 16 52 W -Z.O0
0 4 N 24 23 E -2.05
0 3 S 19 45 W -l.99
0 5 N 60 44 E -2.07
0 5 N 54 26 W -1.95
0 6 S 2 2~ W -1.98
0 10 S 39 29 W -2,14
0 42 S 59 1Z W -2.15
0 29 S 71 15 W -2.17
0 3 S 85 44 W -2.13
0 lO N ~1 17 W -2.04
0 5 S 64 49 W -1.95
0 3 S 75 21 E -1.98
0 5 N 3 46 W -1.94
0 10 N 22 18 W -1,68
0 5 N 33 52 W -1.49
1 1 N 74 11 W -0.99
3 10 N 47 40 W 1.93
ENG!N~ER:
5 30 N 37 38 W 8.98
7 47 N 37 54 W 20.01
10 3 N 35 54 W 34.92
1Z 15 N 30 27 W 53.58
15 7 N 24 42 W 77.05
18 20 N 23 28 W 105.76
ZO 58 N 22 58 W 139.34
23 16 N 23 32 W 176.87
26 9 N 24 59 W 218.81
29 10 N 26 12 W 264.95
RECT4NGUL.AR COORDINATES HORIZ,
NORTH/SOUTH EAST/WEST DIST,
mEET FEET ~EET
0.00
0.25
0.51
0.39
0.28
0.33
0.37
0.14
0.22
0.24
O.O0 N 0.00 E 0.00
0.01 N O.1Z W 0.13
0.33 S 0.1'8 W 0.38
0.54 S 0.08 E 0.55
0.89 S 0.27 E 0.93
1.33 :S 0.3'9 E 1.38
1.67 S 0.42 E 1.72
1.84 S 0.41 E 1.89
1.96 S 0.41 E 2.01
2.0~ S 0.36 E 2.07
0.00
0.00
0.17
0.00
0.00
0.13
0.09
0.00
0.75
0.00
1.99 S 0.36 E 2.02
2.04 S 0.37 E 2.08
2.03 S 0.33 E 2.05
2.04 S 0.40 ~ 2.08
2.00 S 0.35 E 2.03
2.05 S 0.44 E 2,09
1.92 S 0.46 E 1.97
1.9"-) S 0.37 E 2.02
2.15 S 0.3'7 E 2.18
2.50 S 0.49 W 2.54
0.73
0.20
0.00
0 · 06
0.00
0.00
0.00
0.00
1.65
3.18
2.92 S 1.51 W 3.29
3.04 S 1.92 W 3.59
2.99 S 2.03 W 3.61
2.9-9 S 2.27 W 3.75
3.03 S 2.28 W 3.79
2.95 S Z.2Z W 3.70
2.70 S 2.27 W 3.53
2.52 S 2.34 W 3.44
2,25 S 3.02 W 3.75
0.29 S 6,03 W 6.01
2.40
2.26
2.71
2.35
2.08
2.75
2.47
3.39
2.09
3.21
5.34 N 10.94 ~ I2.15
14.38 N 15.09 W 23.11
26.59 N 27.50 W 38.25
42.52 N 38.22 W 57.18
63.44 N 49.18 W 80.27
89.75 N 60.72 W 105.35
120.62 N 73.95 W 141.49
155.19 N 88.59 W 178.70
193.38 N 106.10 W 220.57
235.08 N 126.10 W 266.77
15 OCT-90
64.56 FT
SCHW ~RTZ
DEPARTURE
AZIMUTH
OEG MIN
N 0 0 E
N 83 31 w
S 28 8 w
S 75.5 E
S 16 51 E
S 15 I8 E
S 14 18 E
S 1Z 31 E
S 11 53 E
S 9 55 E
S 10 7 E
S 10 ZO E
S 9 12 E
S 11 6 ~
S 10 3 ~
S 1Z 6 E
S 13 30 E
S 10 31 E
S 9 .~9 E
S lO 50 W
S 27 19 W
S 32 15 W
S 34 10 W
S 37 13 w
S 36 58 w
S 36 52 w
S 40 7 W
S 42 50 W
S 53 I9 W
S 87 14 W
N 63 59 W
N 51 31 k
N 45 58 W
N 41 57 W
N 37 47 W
N 34 5 W
N 31 31 W
N 29 43 w
N 28 45 W
N 25 13 W
COMPUTATION DATE: 30-OCT-g0 PAGE 2
BP EXPLORATION
S-23 (42-27-12-123
PRUDHOE B&¥
NDRTM SLOPE, &LASKA
OST~ OF SURVEY: 15-0CT-90
KELLY BUSHING ELEV4TI~N: 64.56 PT
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED OEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MZN
4000.00 3941.11 3876.55 31 58
4100.00 4024.50 395'9.94 35 12
4200.00 4104.74 4040.18 38 0
4300.00 4181.86 4117.30 40 49
4400.00 4256.44 4191.88 42 52
4500°00 4328.13 4263.57 45 32
4600.00 4397°32 4332.76 46 40
4700.00 4465.95 4401.39 46 4'7
4800°00 4534.31 4469.75 46
4900.00 4602.17 4537.61 47
ENGINEER: SCHWARTZ
5000.00 4659.1,2 4604.56 48 20
5100.00 4735.0B 4570.52 49 1
5200.00 4799.86 4735.30 50 15
5300.00 4862.92 479 ~J. 36 51 ll
5400.00 4975.66 4861.10 51 10
5500.00 49138.75 4924.19 50 6
5600.00 5053.52 4988.96 49 34
5700.00 5118.65 5054.09 49 0
5800.00 51~4.94 5120.38 48 9
5900.00 5251.89 5187.~3 47 49
VERTICAL 30GLEG R~CTANGUL~R C30ROIN~TES HORIZ. DEPARTURE
S~CTI~N SEVERITY NDRTH/SgUTH E~ST/WEST DIST. AZIMUTH
FEET OEG/IO0 FEET :EET FEET DEG MIN
6000.00 5319.35 5254.79 47 25
6100.00 5387.29 5322.73 46 58
6200.00 5456.06 5391.50 4~ 19
6300.00 5525.46 5460.90 45 45
6400.00 5594.95 5530.40 46 7
6500.00 5664.43 5599.87 46 2
6600.00 5733.68 5.669.12 46 18
6700.00 5802.72 5738.16 46 17
6800.00 5871.79 5807.23 46 19
6900.00 5940.B5 5876.29 46 22
N 25 37 W 315.67
N 25 19 W 370.71
N 25 ! W 430.24
N 24 59 W 493.77
N 25 5 W 560.25
N 24 39 W 629..84
N 24 32 W 701.93
N 24 25 W 774.57
N 24 7 W 84~.47
N 23 43 W 920.85
7000.00 5009.67 5945.11 46 35
7100.00 6078.32 6013.76 46 42
7200.00 5146.95 6082.39 46 44
7300°00 6215.33 6150.77 46 48
7400.00 5283.85 6219.29 46 44
7500.00 6352.39 6287.33 46 38
7600.00 5421.14 6356.58 46 33
7700.00 6489.94 6425.38 46 18
7~00.00 6559.40 6494.84 45 45
7900.00 6629.36 6564.80 45 26
N 23 15 W 995.09
N 22 54 W 1070.22
N 22 25 W 1145.38
N 22 15 W 1223.98
N 22 12 W 1301.3~
N 22 1~ W 1379.~3
N 22 35 W 1455.60
N 22 3~ W 1531.47
N 22 46 W 1606.33
N .22 49 W 1680.58
N 22 38 W 1754.39
N 22 23 W 1827.T6
N 22 27 W 1900.34
N 22 49 W 1'972.33
N 22 39 W 2044.21
N ZZ ~6 W 2116.12
N 23 3 W 218~.24
N ~3 9 W 2260.56
N 23 30 W 2332.~34
N 23 43 W 2405.12
N 24 2 W 2477.61
N 24 27 W 2550.24
N 24 3~ W 2622.B7
N 24 4~) W 2595.72
N 24 53 W 2768.43
N 24 42 W 2~41.13
N ~4 46 W 2913.63
N 24 34 W 2986.10
N 24 27 W 3057.94
N 24 21 W ~129.30
2.6?
2.90
3.06
1.93
2.43
2.00
0.52
0.40
0.51
1.21
280.84 N 148.3~ W 317.61 N 27 51 W
330.67 N 1TI.02 W 372.7,4 N 27 29 W
3'~4.68 N 197.33 W 432.34 N 27 9 W
442.37 hi 224.21 ',~ 495.94 N 25 53 W
·
502.71 N 252.4~, W 562.53 N 26 40 W ~
565.95 N 281.72 W 632.Z0 N 26 28 W
631.62 N 311.7:5 W 704.36 N 26 16 W
,597.82 N 341.86 W 777.06 N 26 6 W
764.34 N 371.8~ W 850.01 N 25 57 W
831.4~ N 401.66 W 923.42 N 25 :~'7 W
I .22
1.21
1
0.73
0.36
2.78
0.53
1.58
0.76
0.60
899.6~ N 431.20 W 997.64 N 25 37 W
968.75 N 460.75 W 1072.73 N 25 26 W
1039.07 N 490.05 W 1148.83 N 25 15 W
1110.86 N 519.5.~ W 1226.34 N 25 4 W
1182.92 N 5~,9.02 W 1304.12 N 24 54 W
1254.77 N 578.32 W 1381.53 N 24 45 W
1325.17 N 607.44 W 1457.75 N 24 38 W
1395.21 N 636.6:5 W 11533.60 N 24 32 W
1464.37 N 665.31 W 1608.42 N 24 26 W
1532.83 N 694.12 W 1682.61 N 24 22 W
0.41
0.73
0.31
0.14
0.27
0.5~
0.22
0.52
0.1~
0.34
1600.91 N 722.67 W 1756.46 N 24 18 W
1658.71 N 750.73 W 1829.81 N 2~ 13 W
1735.84 N 778.38 W 1902.37 N 24 9 W
1802.29 N 806.07 W 1974.34 N 24 6 W
1868.60 N 833.87 W ~046.22 N 24 3 W
1934.97 N 861.59 W ?-118.12 N 24 0 W
2001.42 N 839.69 W Z190.Z5 N 23 5~ W
2067.97 N 918.05 W 2262.60 N 23 56 W
2134.38 N 946.$~ W 2334.91 N 23 55 W
2200.66 N 975.63 W 2407.23 N 23 55 W
0.32
0.28
0.2~
0.60
0.16
0.65
0.27
0.71
0 °47
0.40
2267.02 N 1004.9.:5 W 2479.78 N 23 54 W
2333.32 N 1034.81 W 2552.49 N 23 55 W
2399.47 N 1055.04 W 2625.22 N 23 56 W
2465.77 N 1095.51 W 2698.15 N 23 57 W
2531.84 N 1136.17 W 2771.09 N 23 59 W
2597.95 N 1156.69 W 2843.82 N 24 0 W
2663.92 N 1187.03 W 2916.42 N 24 1 W
2729.85 N 1217.35 W 2959.00 N 24 2 W
2795.35 N 1247.13 W 3050.93 N 24 3 W
2860.39 N 1276.70 W 3132.33 N 24 3 W
COMPUTATI3N D~TE: 30-gCT-90 ~AGE 3
BP EXPLgRATION
$-23 (4 2-27-12-128
PRUOHOE BAY
NORTH SLOPE, ~,LASKA
INTERPDLATEO VALUES FOR EVEN 100
TRUE SUB-SE~
MEASURED VERTICAL VERTICAL
DEPTH DEPTH OEPTM
8000.00 6699.66
8100.00 5770.43
8200.00 6842.21
8300.00 6914.60
8400.00 6986.89
8509.00 705~.93
8600.00 7131.03
8700.00 7203.3.4
8800.00 7275.90
8900.00 7348.13
9000.00 7420.2~
9100.00 7491.61
9200.00 7561.9B
9300.00 7631.02
9400.00 '7698.80
9500.00 7765.93
9600.00 7831.91
9700.00 7896.68
9800.00 7960.82
9900.00 8025.59
10000.00 8091.95
10100.00 8158.87
10200.00 8226.53
10300.00 B295.17
lO~,OO.O0 8364.66
10500.00 8434.21
10600.00 8503.66
10700.00 8572.92
10800.00 8642.2~
"" 10900.00 9712.08
llOOO.O0 8781.5'~
11100.00 8850.75
11200.00 3920.99
11300.00 8991.54
11400.00 9061.65
11500.00 9131.47
11600.00 9200.,85
11634.00 9224.43
DATE 3F SURVEY:
KELLY ~USHING ELEVATICN:
6635.10
6705.87
6777.65
6850.04
6922.33
6994.37
7066.47
7138.78
7211.34
77H3.62
FEET DF ~EASURED DEPTH
7355.72
742 7.0 5
7497.42
7566.46
7634.24
7701.37
7767.35
7832.12
7'696.26
7961.03
COURSE VERTICAL DOGLEG
DEVIATION AZIMUTH SECTION SEVERITY
DEG MIN DEG MIN FEET OEG/IO0
8027.~0
8094.31
8161.97
8230.51
8300.10
B369.65
8439.10
850~.36
8577.72
8647.52
45 13 N 25 Z W 3200.32
44 33 N 25 45 W 3270.79
43 51 N 26 1 W 3340.22
43 33 N 25 55 W 3409.g0
43 49 N 25 37 W 3477.90
43 56 N 25 19 W 3547.09
43 50 N 2.4 46 W 3616.26
43 32 N 24 10 W 3685.24
4~ 35 N 23 49 W 3753.99
43 48 N 23 33 W 3823.05
8717.03
8786.Z0
8856.43
8926.98
8997.09
9066.9I
9136.29
9159.87
44 5 N 22 57 W 389Z.31
44 53 N ZZ 35 W 3962.38
45 41 N Z1 41 W 4033.42
46 57 N 21 14 W 4105.T6
47 36 N 21 5 W 4179.28
48 8 N ZO 15 W 4253.39
49 15 N 19 57 W 4321-3.51
49 56 N 19 42 W 440~.$6
50 11 N 19 3q W 4q, 81.34
48 55 N 18 47 W 4557.47
48 ,3 N 17 55 W 4632.15
47 42 N 17 33 W 4706.31
47 5 N I7 39 W 4779.77
46 13 N 17 1~ W 4852.31
45 55 N 16 55 W 4924.~1
45 59 N 16 19 W 4995.59
46 5 N 15 12 ~ 5067.17
~+6 15 N 13 2~ W 5~3~.74
45 56 ~'3!1 41 W 520}.91
45 38 N 9 40 ~ 5280.23
ENGINEER:
46 2& N 8 29 W 5350.38
45 51 N 8 7 W 5420.71
45 9 N 7 4? W 5489.~9
45 17 N 7 53 W 5558.75
45 39 N 7 49 W 562~.04
45 4~ N 8 1] W 5697.65
46 5 N 8 21 W 5767.75
46 5 N 8 21 W 5791.60
RECTANGULAR COORDINATES HgRIZ.
NORTH/SOUTH EAST/WEST DIST.
FEET FEET FEET
0.79
1.17
0.34
0.46
0.35
0.32
0.41
0.42
0.?1
0.30
15-OCT-90
64.56 FT
0.84
0.80
1.0~
1.01
0.36
1.30
0.58
0.45
0.56
1.5'7
SCHWARTZ
0.51
0.38
0.92
0.45
0.22
1.03
1.12
4.47
1.61
1.56
DEm~TURE
AZIMUTH
OEG M IN
0.89
0.92
0.16
0.46
0.55
1.06
0.00
0.00
2925.07 N 1306.30 W 3203.50 N 24 4 W
29,88.87 N 1336.62 W 3274.12 N 24 6 W
3051.50 N 1367.04 W 3343.72 N 24 8 W
3113.52 N 1397.26 W 3412.6~ N 2,4 10 W
31'75.75 N 1427.28 W 3481.74 N Z4 1Z W
3238.37 N 1457.08 W 3551.08 N 24 I4 W
3301.16 N 1486.40 W 3620.37 N 24 14 W
3364.0~ N 1514.99 W 3689.44 N 24 15 W
3416.9% N 1542.912 Vd 3758.25 N 24 14 W
3490.22 N 1570.69 W 3827.35 N 24 14 W
3553.88 N 1598.05 W 3896.64
3618.50 N 1625.17 W 3966.70
3694.31 N 1651.94 W 4037.71
3751.69 N 1678.29 W 4109.96
3820.24 N 1704.83 W 41B3.39
3889.56 N 1731.05 W 4257.38
3960.17 N 1756.75 W 4332.35
4031.82 N 1782.69 W 4408.3~
~104.07 N 1808.50 W 448~.87
4175.99 N 1833.61 W 45'50.82
4246.98 N 1857.18 W 4635.29
4317.76 N 1879.84 W .4709.23
4387.96 N 1902.05 W ',,792.47
4457.34 N 1923.86 W 4854.81
4526.0'3 N 19~4.99 w 4916.29
4594.93 N 1965.52 w 4997.67
4664.1~ N 1985.00 W 5059.01
4734.06 N 2002.90 W 5140.33
4804.35 N 2018.63 W 5211.21
~+874.73 N 2031.87 w 5281.24
N 24 13 W
N 24 11 W
N 24 9 W
N 24 6 W
N 24 3 W
N 23 59 W
N 23 55 W
N 23 51 W
N 23 ~7 W
N 23 ~Z W
N 23 37 W
N 23 32 W
N 23 26 W
N 23 21 W
N 23 15 W
N 23 I0 W
N 23 .~ W
N 22 56 W
N 21 47 W
N ZZ 38 W
4945.75 N 2042.95 W 5351.09 N 22 27 W
5017.21 N 2053.4~ '~ 5421.18 N 22 16 W
5087.72 N 2053.23 W 54~0.15 N 22 4 W
5157.92 N 2072.90 ~ 5558.88 N 21 5& W
5228.56 N 2052.65 W 5628.0~ N 21 43 W
5299.45 N 2092.62 W 56:)7.65 N 21 33 W
5370.70 N 2103.01 W 5767.76 N 21 23 W
538~.94 N 2106.55 W 5791.63 N 21 20 W
COMPUTATION DATE: 30-~CT-90 PAGE 4
BP EXPLDR~T'[ON
S-23 (42-27-12-12)
PRUDHOE BAY
NORTH SLDPE, ALASKA
DATE OF SURVEY: 15-0CT-90
KELLY 5USHZN~3 ELEVATION: 64.56 FT
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED OEPTH
TRUE SUO-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION J, ZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG
0.00 0.00 -6&.56 0 0
1000.00 lO00.O0 935.44 0 3
2000.00 19~9.93 1935.¢2 0 29
3000.00 2999.62 2935.06 5 30
4000.00 3941.11 3876.55 31 58
5000.00 ~659.12 4604.56 48 20
6000.00 5319.35 525%.79 %7 26
7000.00 $009.67 5945.11 46 35
8000,00 6699.66 6635.10 45 13
9000.00 7420.28 7355.72 44 5
ENGIN!~ER: SCHWARTZ
10000.00 8091.96 8027.40 48 8
11000.00 8781.59 8717.03 46 24
11634.00 9224.43 9159.87 46 ~
VERTICAL DOGL~.G RECTANGULAR C~O~DINATES HDRZZ. DEPARTURE
SECTION SEVERITY NSRTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET t=EET FE~T DEG MIN
N 0 0 : 0.00
S 75 43 W -1.98
S 71 15 W -2.17
N 37 38 W 3.98
N 25 37 W 315.67
N 23 1!5 W 995.09
N 22 3,~ W 1754.39
N 24 2 W 2477.61
N 25 ~ W 3200.32
N 22 57 W 3892.31
N 17 5!5 W 4632.15
N 8 2'9 W 5350.3
8
N 8 21 W 5791.60
0.00
0.00
0.73
2.40
2.67
1.22
0.41
0.32
0.79
0.84
0.00 N 0.00 f 0.00 N 0 0 E
1.99 S 0.35 =' 2.02 S 10 7 ~.
2.92 S 1.51 W 3.29 S 27 19 W
5.34 N 10.94 ~ 12.1~ N 63 59 W -
· 2',~0.84 N 14,8.34 ~ 317.61 N 27 51 ~ )
899.64 N 431.2~ W 997,64 N 25 37 W
1600.91 N 722.67 W 1756.46 N 2~+ 18 W
2267.02 N 1004.95 W 2479.78 N 23 ~4 W
2925.07 N 1306.30 W 3203.50 N 24 4 W
3553.$8 N 1598.05 W 3896.6~, N 2~, 13 W
0.51
0.89
0.00
%246.9S N 1857.13 W 4635.2'~ N 23 37 W
4945.75 N 2042.95 W 5351.09 N 22 27 W
53'94.94 N 2105.55 W 5791.63 N 21 20 W
C~MPUTATIgN DATE: 30-3CT-90 PAGE
BP EXPLORATION
$-23 (42-27-12-123
PRUDHOE B~Y
NORTH SLOPEr ALASKA
MEASURED
DEPTH
0.00
64.56
164.56
264.56
364.56
464.56
564.56
664.56
764.56
864.56
96~: 56
1064.56
1164.56
1264.56
1364.56
1464.56
1564.56
1664.56
1764.56
1864.57
1964.57
2064.58
2164.58
2264.58
2364.58
2464.58
2564.58
2664.58
2764.5B
2864.61
1964.80
3065.32
3166.34
3268.00
337D.56
3474.52
35B0.30
3687.96
3797.96
3910.91
TRUE
VERTICAL
DEPTH
0.00
64.56
164.56
264.56
364.56
464.56
564.56
664.56
764.56
864.56
964.56
1064.56
1164.56
1264.56
1364.56
1464.56
1564.56
1664.56
1764.56
1864.56
1964.56
2064.56
2164.56
2264.56
2364.56
2564.56
2654.56
2764.56
2864.56
2964.56
30,64.56
3164.56
3264.56
3364.56
3464.56
3564.56
3664.56
3764.56
3864.56
INTERPOLATED VALUES FOR EVEN 100
SUB-SEA
VERTICAL
DEPTH
-64.56
0.00
100.00
200.00
300.00
400.00
500.00
600.00
700.00
800.00
900.00
1000.00
1100.00
1200.00
1300.00
1.400.00
1500.00
1600.00
1700.00
1800.00
1900.00
2000.00
2100.00
2200.00
2300.00
2400.30
2500.00
2600.00
2?00.00
2900.00
CgURS~
DEVIATION AZIMUTH
DEG MIN DEG MIN
0 0 N 0 0 E
0 11 N 86 23 w
0 15 S 6 39 E
0 9 S 40 39 E
0 12 S 36 50 E
0 19 S 21 51 E
0 15 S I 34 E
0 4 S ¢1 37 W
0 3 S ¢5 4 E
0 6 S 17 51W
0 4 N 23 41 W
0 4 S 593.3 E
0 3 N 894'9 W
0 4 N 91 40 E
0 3 N 87 22 W
0 5 S 73475
0 5 N 7 23 W
0 5 S 39 34 W
0 5 S 10 42 E
0 40 S 69 51 W
0 39 S 67 5 W
0 11 S 74 45 W
0 6 N 30 43 W
0 8 S q5 15 W
0 1 S 11 54 E
D 4 N 18 4! ~
0 10 N 13 0 W
C 5 N 133'2 w
O 3~ N 70 2~'~. W
2 20 N 54 17 W
2900.00 4 36 N 39 43 W
3000.00 6 58 N 38 43 W
3100.00 9 13 N 37 31 W
3200.00 11 23 N 33 39 W
3300.00 14 ZO N 26 20 W
340~.90 17 33 N 23 30 W
3500.00 20 27 N 23 3 W
3600.00 22 57 N 23 1~ W
3700.00 26 7 N 24 59 W
3800.00 29 31 N 26 12 W
KELLY
FEET OF SUB-SEa DEPTH
VERTICAL DOGLEG RECTANGULAR
SECTI3N SEVERITY NORTH/SOUTH
FEET DEG/IO0 FEET
0.00 0.00 0.00 N
0.04 0.42 0.04 N
-0.09 0.48 0.20 S
-0.41 0.44 0.43 S
-0.83 0.29 0.80 S
-1.ZZ 0.41 1.19 S
-1.55 0.36 1.51 S
-1.83 0.37 1.79 S
-1.98 0.22 1.97 S
-1.98 0.09 1.9'9 S
SURVEY'
ELSV,~TIDN:
CNG!NmER:
C30RD'IN~TES
EAST/WEST
FEET
0.00 ~
O.OO E
0.25 W
0.03 =
0.22 6
0.32 E
0.4O E
0.45 E
0.40 E
O. 35 E
ORIZ.
ST.
ET
15-CCT-9O
64.56 F'T
SCHWARTZ
H
0.00 N 0 0 E
0.04 N 0 56 E
.0.33 S 51 57 W
0.43 S 3 51 E
0.83 S 15 40 E
1.23 S 15 10 E
1.56 S 14 48 E
1.84 S 14 4 E
2.01 S 11 34 E
2.0.2 S 9 54 E
-2.01 0.13 2.01 S 0.3.8 E 2.0~
-2.03 0.19 1.04 S 0.34 E 2.07
-2.00 0.00 2.01 S 0.35 r-_ 2.04
-2.06 0.00 Z.OT S 0.37 E 2.10
-I.99 0.11 1.9'9 S 0.38 E 2.02
-2.05 0.10 2.05 S 0.39 E 2.09
-2.00 0.00 1.96 S 0.48 E 2.02
-1.94 0.09 1.93 S 0.39 E 1.97
-2.09 0.03 2.0'9 S 0.39 E 2.13
-2.16 0.14 2.35 S 0.05 W 2.35
1.1!
1.85
1.94
2.21
2.30
2.2~
2.24
2.32
2.55
4.71
3.03
3.54
3.5-')
3.70
3.74
3.53
3.45
~.49
4.90
-2.17
-2.13
-2.09
- 1.96
-1. ~6
-1.98
-1.78
-1.54
-1.28
0.48
5.03
15.75
29.38
47.11
69.58
97.92
132.34
172.19
217.91
270.24
DEP4RTUR=
AZIMUT~
OEG MIN
0.18 2.79 S
0.50 3.02 S
0.73 3. O1 S
0.16 2.97 S
0.14 3.01 S
0.19 3.01 S
0.00 2.80 S
O. O0 2.57 S
1.83 2.38 S
1.47 1.35 S
2.52 2.92 N
1.86 10.89 N
2.72 22.05 N
4.20 36.94 N
3.41 56.67 N
3.42 82.55 N
3.08 114.18 N
2.99 150.89 N
2.07 192.56 N
3.05 239.85 N
S 10 49 =
s 9
S 9 55 E
S la 5 E
S 10 q. 8 E
S 13 51E
S 11 19 E
S 10 39 E
S 2 Z W
S 22 5.3 w
S 31 28 W
S 32 ~+9 w
S 36 35 W
S 37 19 W
S 36 27 w
S 33 42 W
S 4Z 3 W
S 47 2 W
S 74 4 W
9.02 W 9.49 N 72 3 W
15.33 W 18.80 N 54 37 W
24.14 W 32.73 N 47 34 W
34.7~ W 50.71 N 43 14 W
~,5.95 W 72.97 N 3'-~ 3 W
57.60 W 10C.66 N 34 ~4 W
71.22 W 134.57 N 31 57 W
~6.75 W 174.05 N 2~ 54 W
105.72 W 219.67 N Z3 46 W
128.45 W 272.08 N 28 10 W
COMPUTATION DATE: 30-0CT-90
BP EXPLORATION
S-23 (4Z-27-12-123
PRUDHOE BAY
NORTH SLOPE, ALASKA
TRUE
MEASURED VERTICAL
DEPTH DEPTH
4027.77 3964.56
4149.49 4064.56
4277.21 4164.56
4411.12 4264.56
4552.38 4364.56
4697.97 4464.56
4844°43 4564.56
4993.15 ~664.56
5145.20 4764.56
5302,.62 ~864.56
5461.96 4964.56
5617.00 5064.56
5769.42 5164.56
5918.85 5264.56
6066.65 5364.56
6212.30 5464.56
6356.17 5564.56
6500.18 5664.56
6644.73 5764.5.5
6789.54 5864.56
6934°40 5964.56
7079.94 6064.56
7225.71 6164.56
7371.85 6264.56
7517.73 6364.56
7663.17 6454.56
7807.39 5564.56
7950.13 5664.55
8091.76 6764.55
8230.96 6864.56
8369.07 6964.56
8507.81 7064.56
8646.44 7164.56
8784.36 7264.56
8922.69 7364.56
9061.91 7464.56
9203.70 7564.56
9349.33 ?664.56
9497.94 7764.56
9550.22 7864.56
INTERPOLATED VA
SUB-SEA CgURS
VERTICAL DEVIATION A
DEPTH DEG MIN D
LUES FOR EVEN 100 FEET OF
KELLY
3900.00 32 45 N
400'0.00 36 35 N
4100.00 40 21 N
4200.00 43 8 N
4300.00 46 19 N
4400.00 46 47 N
4500.00 47 IZ N
4600.00 48 15 N
4700.00 49 34 N
4800.00 -51 11 N
SU~-SE~ DEPTH
4900.00 50 55 N
5000.00 49 31 N
5100.00 48 17 N
5200.00 47 43 N
5300.00 47 8 N
5,400.00 46 17 N
5500.00 46 Z N
5600.00 46 2 N
5700.00 46 24 N
5800.00 46 19 N
E VERTIC,~L DOGLEG RECTANGULAR
ZIMUTH SECTION SEVERITY NORTH/SOUTH
EG MI:N FEET DEG/IO0 FEET
5900.00 ,46 30 N
6000.00 46 42 N
6100.90 46 50 N
6200.00 46 46 N
6300.00 46 35 N
6400.00 46 33 N
6500.00 45 44 N
6600.00 45 21 N
6700.90 44 38 N
6800.00 43 42 N
25 28 W 330.51 2.89
25 5 W 39'9.71 2.68
24 57 W 478.96 2.28
25 ) W 567.83 2.50
24 34 W 667..42 1.47
24 25 W ?73.09 0.45
23 58 W 879.98 0.55
23 16 W 989.98 1.11
22 39 W 1104.47 1.42
22 14 W 1226.02 O.TT
6900.00 43 45 N
7000.00 43 55 N
7100.00 43 42 N
7200.00 43 30 N
7300.00 43 46 N
7400.00 44 36 N
7500.00 45 44 N
7500.00 47 21 N
7700.00 48 7 N
7800.00 49 40 N
22 11 W !350.07 1.62
22 38 W 1468.53 0.42
22 31 W 1583.53 1.1'9
!2 49 W 1694.54 1.22
22 26 W 1B03.35 0.41
22 29 W 1909.23 0.43
22 45 W 2012.64 0.50
22 46 W 2116.25 0.56
Z3 5 W 2220.59 0.41
!3 29 W 2325.28 0.20
23 47 W 2430.02 0.47
24 23 W 2535.66 0.29
24 39 W 2641.58 0.60
24 56 W 2747.96 0.28
24 41 W 2B54.00 0.26
24 41 W 2959.44 0.69
24 28 W 306).23 0.37
24 32 W 3164.94 0.75
25 42 W 3265.03 1.Z0
26 3 W 3361.57 0.95
25 42 W 3456.55 0.35
~_5 17 W 3552.50 0.39
24 28 W 3648.34 0.67
:~3 50 W 3743.23 0.4.2
23 27 W 3838.74 0.39
12 45 W 3935.57 0.94
2l 39 W 4035.08 1.15
21 11 W 4141.92 0.49
lO 16 W 4251.~5 1.31
19 56 W 4366.65 1.18
294.26 N
356.97 N
428.92 N
509.59 N
600.18 N
696.47 N
794.07 N
894.94 N
1000.34 N
1112.75 N
D~T= OF SURVEY'
,-, %,. .
5USHING ELEVATION:
ENGINEER:
COORDINATES HgRIZ.
EAST/WEST gIST.
mEET FEET
154.75 W 332.47
184.39 W 401.78
217.94 W 481.11
255.65 W 570.12
297.39 W 669.82
341.25 W 775.58
385.13 W 882.54
429.1,8 W 992.53
474.00 W 1106.96
520.30 W 12Z8.38
1227.59 N 557.21 W 1352.30
1337.11 N 512.41 W 1470.68
1443.32 N 656.5,4 W 1585.63
1545.70 N 699.53 W 1696.62
1646.14 N 741.42 w 1805.41
1744.05 N 7~1.78 W 1911.25
1839.47 N 821.69 W !014.66
1935.09 N 861.65 W 2118.25
2031.20 N 90Z.36 W 2222.62
2127.44 N 943.67 W 2327.34
2223.47 N
2320.03 N
2416.50 N
2513.24 N
2609.66 N
2705.60 N
2800.17 N
2892.89 N
2983.66 N
3070.75 N
3156.45 N
3243.27 N
3330.38 N
3417.08 N
3504.62 N
3593.76 N
3686.79 N
37~5.40 N
3888.12 N
3996.04 N
PAGE 6
15-0CT-90
64.56 F'T
SCHWARTZ
·
DEPARTURE
AZIMUTH
DEG
N 27 44 W
N 27 19 W
N 26 56 W
N 26 39 W
N 26 21 w
N 26 6 W
N 25 52 W
h 25 37 W
N 25 Z~. W
N 25 4 W
N 24 48 W
N 24 37 W
N 24 ZB W
N 24 Z1 W
N 24 15 W
N 2~+ 9 W
N 24 4 W
N 24 OW
N 23 57 W
N 23 55 W
1418.01 W 3450.34 N 24 11 W
1459.39 W 3556.4g N 2~+ 14 W
1499.7:~ W 3652.5,3 N 24 15 W
1538.57 ;~ 3747.49 N 24 14 W
1576.94 W 3~43.06 N 24 14 W
1614.84 ~ ~939.90 N 24 12 W
1652.92 W 4040.35 N 2~ 9 W
1691.~7 W 41~6.03 N 24 5 W
1730.53 W 4255.34 N 24 0 W
1759.79 W 4370.41 N 23 53 W
9~5.67 W 2432.15 N 23 54 W
1028.78 W 2537.90 N 23 55 W
1072.84 W 2643.95 N 2.3 56 W
1117.53 W 2750.50 N 23 58 W
1162.07 W 2856.70 N 24 0 W
1206.23 W 2962.31 N 24 2 W
1249.32 W 3066.23 N 24 3 W
1291.45 W 3168.07 N 24 3 W
133~.I1 W 3268.34 N 24 5 W
1376.44 W 3355.13 N 24 9 W
COMPUTATION DATE: 30-OCT-90 PAG'~ 7
BP EXPLORATION
S-23 (42-27-12-12)
PRUDHOE BAY
NORTH SLOPE~ ALASKA
DATE OF SURVEY: 15-0CT-90
KELLY 5USHINS ELEVATION: 64.56 PT
ENGINEER: SCHWARTZ
INTERPOLATEO VALUES FOR EVEN 100 FEET OF SUS-SEA OEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH OEPTH DEG MIN DEG M[N
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. OEPARTURE
SECTION SEVERITY NORTH/SOUTH E&ST/WEST DIST. AZIMUTH
~EET OEG/IO0 FEET FEET FEET DEG ~IN
9805°84 7954.55 7900.00 50 9
9958.90 B064.55 8000.00 48 16
10108.45 8164.56 8100.00 47 39
10255.61 ' 8264.56 8200.00 46 37
10399.86 8364.56 8300.00 ~5 55
10543.73 8464.56 8400.00 46 1
10687.89 B564.56 8500.00 46 25
10831.99 8664.56 8600.00 45 48
10975.34 8764.56 8700.00 46 10
11119.77 ~864.56 8800.00 45 40
N 19 36 W 4685.82
N 18 18 W 4501.57
N 17 31 W 4712.55
N 17 24 W &820.25
N 16 55 W 4923.91
N 15 49 W 5026.~3
N 13 46 W 5130.07
N 11 1 W 5232.50
N 8 29 W 5333.01
N 7 5~ W 5434.48
0.70
1.23
0.04
0.91
O.2Z
1.33
6.96
1.57
1.25
1.05
6108.29 N 1810.00 W 4489.34 N 23 ~7 W
4217.86 N 1847.67 W 4604.80 N 23 39 W
,4323.7Z N I881.T2 W 4715.44 N 23 31 W
4426.65 N 1914.2~:l W 4822.83 N 23 23 W
~.525.98 N 1944.96 W 4926.20 N 23 15 W ~)
4625.19 N 1974.18 W 5028.90 N 23 7 W
4725.55 N 2000.85 W 51'31.69 N 22 57 W
6826.85 N 2023.15 W 52]).71 N 22 46 W
4928.12 N 2040.32 W 5333.79 N 22 29 W
5031.22 N 2055.46 W 5434.90 N 22 13 W
11261.69 8964.56 8900.00 45 10
11404.16 9064.56 9000.00 45 39
11547.66 9164.56 9100.00 66 6
11634.00 92~4.43 9159.~7 46
N T 52 W 5532.32
N 7 49 W 5630.93
N 8 21 W 5731.02
N 8 21 W 5791.60
0.17
0.51
0.00
0.00
5130.93 N 2069.18 W 5532.49 N 21 58 W
5231.51 N 2083.06 W 5630.97 N Z1 4.3 W
5333.38 N 2097.53 W 5731.02 N Z1 28 W
5394.94 N 2106.55 W 5791.63 N 21 ZO W
SCHLUMBERGER
O I REC T I ONAL SURV E Y
COMPANY
BP EXPLORAT I ON
WELL
S-23 142-27- 12- 12)
F I ELD PRUOHOE BAY
COUNTRY USR
RUN ONE
DATE LOOOEO 1S - OCT - 90
REFERENCE 74157
,LL' S-23 (42-27-12-12) ~---
~1631' SNL, 943' E~.;L, SEC 3:,, ,'12N, RlZE)
HORIZONTAL PROJECTION
NORTH 7000
6000
4OOO
3OOO
~000
10o0
~UTH - ! 1200
WEST
REF 74!~? SCALE = !/lO00 IN/FT
--*-.-:-r--~--:--.-?t-+--b.-r?-,---?-,-?.-+-...-.H..4.4-¢4:'-4.-.~-.~ ....... .L.L~..~.--f,.----:.-+--H?'. t'--H* ....... .:-..H..4 ....... .5-..:'.-HH--4--b¢.H-.~.4-.L!.b,L~...L~
...i--;.-,b~;, ..... 1....;.--4-..* ...... *--*...4-4 ....... -~,..,;-..4...4 ....... ,'-.-:...i,..; ......I ;---;.-4...; ....... -.:...L.-;--.; ...... *.'"";"'i'"+ ....... *"+'-H-*.' ...... +"'i"'H'3 ....... ~"'{."+'"-? ...... ,*'.'i"";'"+ ........ i"-i'"H"?'"H'?'"'(" f'-? ...... *,'-~".* t' "f 3"'3"'~'.'
4.-4..4.-4 ....... b.~.4-4..--4.4-i--.b-.4.--4...*-.; ....... 4...;...;-i ...... L:...i...: ....... i...;~...;..1...4...I...4...4..~...:...;...;...4...t...4...;...;...4 ....... ;..4...;.-;...t...;...;...;...: ....... ;...:..+..;...4 .............................. , ....... l..., ...... ~ .......
.... : . · , , . , , ~ : : : : ! : ; : : : : : : ! : I : : : : : : ! : : : ; : : : : : , : I : : . . : .......
,-,3.4.-*...4 .... 4---~--p-i--. ,-.*--.4--.-,..--4 ....... 4.-.-.: -.-4-..i--., --.4...4---4,-4..-+...4...4 ...... ' ....... '-.' ..4...4--~t -.4---4.-4--4 ...... 4.--4..-4.--4.-.,...4..-4-.4...' ...... ;.... '... '... '...4...4.,.4... '...4 ....... 4...4...*.,.-,-...~...4...4......; ...... ;...4...4... !...1..}..; ... :- :...
' ' : ~ ' ' ' : : : : I ........ · : : t :* t T ...... ~ , , · .... ? ~ ..* t t : : t .....
-.,-+4...~. ....... ,...,.-.~-~.- .-..,..4..-~ .......... +--H*'--* ....... *'-'*--~---*--'H*..-*.--~.~ ....... ,...+.4..*.4-*..-*--*...*.--4 ...i.--;--.$-*-4--.i..-*-.*-.., ....... ;-..;...i..-*-..l.-.*..-*..-;-..* ...... ;...~...;...,...f...;...+-;..4 ..... ;-4...,...,-.,...;...H.;-.,...
+e-*~'-- ..... ~'~. ' .~ff"t~ ! : : : ,--4--4-.~.--+--.[ ! : : ,-.-~,---4-.4--.*---,; T ! ! -.4-..i---;.--}; ~ .......... .... ~---4-4---4 ....... ~-4-.4--4..4..'~-.-~..-.4.-4.-~ ....... --*~-i~--*.--* ..... 4 H*--~"-.-; ........ .... *..-;~4--.i ..... ~ ¢..4...¢.-i-- ............ -.*...;-.-;..4 ......
_.,,.., .......................................................................... Z...,...,...,..., ....... ...... , ....... .................. ....._.. ................. , ..................
....... ;~ ..................... ~ !: .... "?"*"'*"~"["'+"';"'*"'~ .....
-~-~*--~-+'+"-* ....... , ........... ~ .......... * ....... *'-*--*-'H'--'-.-~..-~-.* ..... ,-.;.--*-++-+..*-+*.-~--*--,-.*--,.-4..-;-..,.., ........... ,...,-.., ....... } ..... ~ .............. ~..*..,-.H..., ............
M..4.A.4...L..,..,.,~4 ....... ¢...,...;.-; ...... L..L.;-.L....4...L.;.4...,.4...L..L.¢ ...... ;..;-.L.~..4.-*...;-.,...;...4...L..L..L..;...,...;...L..L.~ ...... ¢.4~.;-.L.~...L.;...;...; ...... ;...;...L.;...~...L.;,..L.~ .......
-~-H.-~-,'++~"*"'--+--,--*--'-++++--,---?*--,-'*-4'++--++'.-gl~*47'?-*--* ...... ??'+--?~'++--*-+'-',"'~.-'+ ....... H-.*--*-'+-+'-.."~"+'-'"'+ ....... ,"',"+'* ...... +"+"+ ....... I"+-"-'-+""
~-L4-. [-4---4---}..-~---4.4--4-4-H*..4.-4--4---: .-4..4...i--$--4-.-;...:-..¢.[.-...,-4--+--¢--4--+-.¢.4..4-+ ...... ¢-+-H4.4.-+.4.-4.-4--, .-.}.-4..-b-L.+..b-+...+--f-.. "4'"f"+'-f'-"+"*"'f"~ .......
~-:-F' ~'~"T'''t- '-~'. "T"t ..... t"t'~-'t": '"t'"t'"T"'t ...... ,'-,'",'"~ "'T"t'"T'T'- -~ ...... t"T" "T't ...... t'-l'"t"?"t"'t ....... t'''t~'t'''t .... t'"t"'l"'t ....... ?t"'?t ...... '"'H'+"~ ....... t-'+"'t"'t ....... *"'?'?'+'"
~ { ( -'l"'i ..... f'*"{'"t ....... ~ ...... f-~ ....... *'-t ....... i ...... f-+"t''4 .......... f'"H'i~"-'?"?"H'f''~ 'H'"?"t"~ ...... ~-'-~.~-f---.4...H+--T ...... i..-f...f...f.....~.-.~-4..4 ....... ;..-1...+.--+ ..... {..4---t.-.{ ....... ~"'t'"t"~ ...... ~"'t'"f'"i
. i f I , - : : ~ i i : : : : : : . . : : .......... ' . - : : -
t t : : . ~ ~ . . . , ~ ~ . . . ~ · ~ ....... , . . ~ . . . ~ . t T . ~ ~ . : . . . . . . ~ .....
-~..,1 ~ ~ s~4.-~-~ ~.~: ~ ...... 4"~'- ............ -~'"e'"* ...... *"'~"'*'"~" ~"~"'*'"*'"*"1:''~ ~'~'"* ........... "~'*'~' '~"~'"~"*t ....... *"~"'~"*:: .... *"'*'"*"*~ I : i .... ~"~:: ~ t* ....... ~'~'"*"'*"': · t : ..~...~...,..~. .... ....... ~ ...... ~ *..4 ...... ...... ,...,.-~.-*..-
..... ..... ....... ........... ..... ........... .......... ...... .........
~4-.L.~.--&4...~..-L- ...i-.L..~-.&.....i..,;...i...L., ,.4...L..;...~ ....... L.i...i-.;...¥i-.¥-i-4 ..... &.i...L.i ...... i,..i-.;..L,,...~...;.&4 .... i...L..L,.~ ....... L..;-4.-~ ....... L..i.-:..4-.[...&.L..i..&.....4.,.:..4.,.i ...... i...L..;...; ....
' ; ; : ; ; : : : ; : ~ ~ : ; ; : : : : : · : , ~ : ~ , ~ : : ~ ; : · : . · , ; ; . : ; : ; , . ,
-~..~...~.~-~-4-~..~-'~; ........... ...f..~..-,...; ...,..~-..~-~.-. ~...$-~.4..4.-.~..-~..4...~-4....~' ................... ..~.--*..~-..~-. -+..$.~4 ...... ,..4...,-., ....... ~..4~...~ ..... ~...;..,..~.....~..%+.4......+--;..4..4... ,..4..~..4..~..-4-.~-.*.~ '~ ;]~..-;-..~ ....
~'f"'"++'~'~; ~ .... t"~-t-'?;; ~ ; ' ~ ~ ~ ~ ' ' ~ ~ '"'t"~"~?"k"?"???'+?'?t"?- ~ ~ ~ ; '-~"~ : ~?'?'" ' : ~ '~'"r"~"'~ ~ ~ ~ ....... ~'?~"t~ ~ ~ ~ ..... ~"~"~"'~ ~ ~ ~ ....... *"'~-'~"~""~:: ~ "~"'??r"; ~ ~ ~ '"??-~-~ ~ ~ ....... ~'--"~"~ ..... ...... r'-$'-~"-~--" ~ '
.L ~=~ ~. -.;.4...~.~.- ...;...~...;.-~ ...... ;-;..4..4... ,-4.-4...~-4 ....... ;-;...~-.~.., .~;.~..~, .... ~4-~..4 ....... ;-~...~.-.~ ....... ~...i..4.~ ...... ~..~..4..-; ....... ;.4.-~..~.-- ..4..4..4..4...-.~-.;..4..4 ....... ~"4'-.~"-; ....... ;'.'~-';"-~ ....
~-~,~.-.~.-4.-~ ...... ~-.~-~4--~.4- '.~...;.. L;.4_;.,.~ ...... ;4...;..~....~4..4..~... -~-.~...;...~ .... ~.44...~ ....... ~-.¢.44...L.4...~.L.~ ...... ;...~-~...~ ..... L.-L4,,.;..,..~-.L4..~ ...... ~.,,;-4,.~ ....... L..;..,;..~ ....
...~...H.., +~...~.-~.~-=+.+.--+*.+..~ ..H...~...~.-~..+4::~:~4-*+.--+,..4..,...-+.-~? ~-.H..+.+..-,-+..~..+ ..~-+++.-.,.+..~ ....... 4,..+...,.+...,4.4--+..
W.,-+-~.-.-H-+.+......H..+-~.~-.+-4...H.-L..H..4.-4...,...H..4-..~ ....... H..-~4~.--..+4..+..+ ....... H-.+.-~ ...... H..4...H..4..~'"H""-+'+4-¢'~--4-'-~4'-~ ...... H...H ...... ~...H.-.~...
~-+..e--+~¢-~--?-~.-~-.,--.~ ....... ,.-++--,---{-..~.--t-H ..... ~"~'-~ ~?'*'t"?'+t'?~"' ?.?-.,-t-. ~-'~"~+5" '"H-'~- "T'?t"t""?Hq ...... %..H...b+..~..~-+-
~-~'-?'-'~+--~-'-,'?-~-~--t~'--*--~ ...... ~--?t--t'--t-"*-?'~'"t'--t-'*-"~---~-" gr--k-t--t ....... t-m-?-:-'-f-?'r--?'?-r'+"'t"tm" 'm??'~'"' '~w'"t"* .......
'"1 , ~ ~ : ~ : : ~ .... I .... :'"r'T'~ ....... *"~ ...... ~-', --~.'-'-~-":-"?: ..... r? ."~'-?,"~ ......... ~ ........................ i ....... ~..,-.,..4 ....... ,...:...,.4 ....... '-4...,-,...
m.-~*.m..- "~--*-~-'~'t"'*-*'"*"4 ......... 4.4~...{.-&.+.?.~... -+4.-~-4.,-.-~-~q--~ ..... H+-.4.-+~-.{-4 .... . L.-4---H~-, ....... . ..... +.~-.- ..4-4.-4 ........
;iii .............. ' ................
-4-~-4.-- 4--~-~-.~-~...$-4.-~--.~ ........ ;.-~-.~.-$---,--4-4--4-~-- .-$.-,$-.4.--$-.~-4.-~4-~ ...... *---~..-$.-.~--.~--$-4-4-.....-,,-4-..~...~-.~ ...... ~...~.-~...~-, -.4~4..~..~...
-~fH-'~ ............. ~ .......... 4-, .......... t ........ ~' ~'+~-'~ ....... F',~-'t'-.-?4 .... r" -~"'*'~"~'" "?'t"'t''4 ....... ?'*"~' '"f'~ ............ t~"'~-4'''
-"~ ...... ?~'~--~-~---f-t ....... ?f-'?~ ...... t---~--*~'-~--t-Hr-~'-~'-?--?~-?~z*==-~-t'''?-'?-'~ ...... y--wr"? ...... r~-'T"~-~"~-t-'~ '-w'?'--?~ .... r-~-'?m-'--T~-'w?"-
~ .-~.4--~- ,-~.-.~.-4--4 ...... ~.-~-4---~.-- .-4-..*-~~..-i--..-.i.--i...~4.- .~4.--~--4-..*..~ ~14-4-*..~ -.~.:.~ ---~-~...*...* ....... ~-.;-~..~- -..~..-i.~..-~.- ;...*,.~--*-..i ....... m--*,.,~ ...... *,,4-.~ ...... *,-~--H*-.-
'~"~' .... TT ,~'-'..4 ' · ,...~, t T :'--~ ..... ~T : T i ~ ; ~ ~: ~;' · '..4-',.-~ -.' '...~ ..- L ..... ~...~$ .... ~ ~'..4. · 4... ~.~, ~4 .~.. '..4 ..... .... ~...~..4-$ .... ~; . , J , ~' .4-~.4 ...... ~ ..... .......... ~,., m.~.4.,~....-., ..4-.....~..4 ...... .,...-...,..; .... ...... ~..t , :"'~"~-
.... , .... ~ ........ J ............... . ; ~ ~ J ~ ~ ~ ~ ~ ~ ~
'.-'-'.--~.. -f.-~-f-.~ -++4-4 ...... H.-+--;---..-H.-++-'..H..-H--,+H...* ....... ??,?.~-,..~--.~..?~ ...... H-.H ....... ~..,~,.-$..~ ....... H...+.+..,..i..?.t..t ....... i-i"'Y'~"'
-++-+'+---+~'-,-+++-r- --b-f+--?-+.+--~+-- ~-~-'~-~"'t'"~'"~-4..4...;...L....4-+4...: ....... ;..;-;.4 ........ ,..+.~ ..... ,...~.,.., ....
· -.4..H-4 ...... H-H--.'--~-~---t-,--~--5-~-+-, ...... H.-.?-, ..... {.-~-'-?-~ ..... H'"f"~ ......
'T'Ft'"~ ....... ~T'FP"?'?'T ....
~4..~- ~'T ~ '~"'t"~-'r"~" "T"t-~'"t"~"~'~'"t"'t"' r"r"t'"~'t ..... r"t"~-t"- , ~ ....
-4-4...L~ ......... ~-4-4-+....~.~..~.~ ....... ,.4...,..., ...... ,.4..+..~....~...~..4-.,--~4..~..-4-4 .... H¢4-4...~..4-.4~-H ~...~..??-.~ ..........................
~ ~ ~ ~ ~4-{ .... ~.&bb-4..4-~.4..[4-~.¢~-.-+.~Sd.-~-fd-~ ~-~f-i-"-%4"+"~"~'?:f":~Z:i2~:
-T..,-.~?.
.... f.?..~?_ _~..?~.~.. _~ ......... ? ...... ? ....~.~.4-..~. ..~..4..~...}-.~.1.]...~-4...~ ...... ~-.i...~--~ ...... ],.,]...~4 ....... ~.,4-.~...~.--[.--],.-~...~...] ....
' ; : ; ; : : , ~ I : : ~ : : , ; il' : , ' ' ; : : ' ; : :
: : :, '-,-?,'?-: ~---,-T-~--~-'--~-r-~--~-~-'?~-~"-?~-?~ v[.-~.--?-4."}-'.~-+'+"+ ...... +..+.+-+....%+..~-.* ...... +...~-+--+ ...... H+'+..t ....
.... .%~.~4_~ : : ~4_=¢4 ] .......................
' ~ '': ~::: --4--,{.-bb~-b4-.-H .... ~"'~"'~'"~"'~"'~'"~"'~ ~" ~-'~"'}'"+"'~"'~'"+ ...... ~"'+"'+"'~"'["'t"""'~"'+ ...... ~l"t"'+"'~"'}"+"'?'~'"+'"
~' ~ ~ '"t'~"~-'
i. ...... ..........
........... · .~.1...~..;-¢...i ....... ~...~...;,.4 ....... :...~,..;.&... '''il'';''';''~''~''';'''~'l';'''~'--
......... t"~-t--?t"t'"?".'"??f"t-'"5'f'~-J ....... rT"rT- : ........ ~_l,. ,: ~: .,~
~ -~- -~...t..+-~.-.t-i.-?? ...... +'+'",'", .... +'+'?~ ....... +'+'?'+"
~..._~3] -~.H '~]TT'I]~]' ' ' Ei~;;~': "~!"l'~ .... ]~~:~T" ~-.+.-~--4 ..... ~.4...L.i-.: ~ ~ : .4...~.4...: :~ .... .q.]]]]i]]] ...b4..4..4 ...... ,---, .............. ;.-H...~ ...... H.-.;...~ ....... H..+.+..
. ~ ~.: .... yyy.yl ~_~: ~ ..... f"t-?'?" .-*-4-*...~.. ..~q..f.( .......
...., ' ............... ~...~-.f.~- ..-~-.:4-4.-.-4-4...~.4 .....
..... z ..: .... -.?..,...,--., ....... ...... * ...... t"t"'t"'?t'"t"'t"t"'?'":.t"'?t .......
, , ~ ..... T"T'T'T" , ~, ~ . . . .
-4000 -DO00 -2000 - 1000 0 1000 2000 3000
EI:~T
ELL' S-23 (42-27-12-12) ~
(1631' Slib,,9¢3' E~.IL, SEC 3b. F12M, R12E)
VERTICAL PROJECTIOI'I
- ! 000 0 0 ! 000 2000 9000
158. r j i ~ ! I ~ ~ ~ ~ ~ ~ ~ ! .... ; .... ~-"'?' ....... ~'"'-'""~ euuu bUUU 6000 '/000
..... ,; ........ ...... ....... ....... ......
....... ....... ....... ::: i'
'...~...~.]~]]~]],. ~ , ][]~]~]~]]~]]~ ~ []]~:~]:~ ~"t ...... F'?'T"t ...... T'T'T"r"*~?"?'i +'+" +; ~ ~~ ~ ~ ' ' ; .... ...... ~...~...~...~...'...~...~...~...~ ~.. ~..~...~
· ?.....-?..?? ..... ...... Z:i ....... ....
-.~.-;..~-~ ...... ;...:..;--~......;..;~...~ ....... ~.-4...' : ]...',:: ~;~ : ~ .... ~'"~"'~'"? ...... ?'?"'?--~ ....... ~.-+-+..;..-t..;-.-;--.;...; ....... ; ....... ; ....... ,...~...;...;; z...L ~ ~;: ~
-H...~...¢4...~..4..4 ....... ~...4..4..L~ ...... L.r:]X:::~]X:X,:::~"'r"t"rT?"t"¢"-~-":'"P~-"t-~'-t'--?++-.~ ..... H'--~"-~"'r'-~'--¢'-.;-; .......
...... YT'TT!'T't"Y ...... TFW':"'Yri"? ...... ....... .-
&..~-¢.¢. 444.+...44..4...~-L4...;..~X ~ ~. ~...~J 5][T'r'""?'?r-FT'?'T"t"~'" '"~'--f--~--i ....... f-+-+..; ...... ¥4-+.4 ....... 4-..~..4...¢ ...... ~...;...;...~...~...L.~_.;...;.. ~.~...~..~ ~
i~4..4.-4 ...... I...~.-4...~....&-:...:...~. ~ } ~ ~ } ~ ~ ; ~ "~-?T-?'*'"~"~-T"T-"W"?'~-~ ....... ~"+"'+"~ ...... ,...L..~...¢ ...... ~..4..4...* ....... ~...~ ...... ~..4..-i-~..¢.} ' : ~ ~ : ; : ~'
~ ~ ~ - : ~ ~ :~ ~ ~ ~ ~ ~ '. ~ ~ ~ ~ ~ · ~ ~ ~ ~ ~ ~ ~ ~ .... ?"~"'??"7'~'"~"'~"'~ ...... :'"~'":"T"~ "'~'"~"'*'"?T"*'";"+''* ...... ~..+..¥4...~-.~,..~...~...~ ....
-'--~---~..+-----4--~--~..~ ....... ? '"~"'~-"t'--~--~..-~---~-- ~,..;..~ ~ ~ ~ ~ j : ; : ~ ~ ~ ~ ~ ~ T"T ........ ~'"T"'?"? ....... ?"'?'"t"'? ...... t"'t"'?'t ...... t"'?"'+'"+ ....... *-.4,..*,..*...~,.*..~ ~,..t.
..~'....~ ....... I..¢..~..~-....4. : ~ ' ~ ~ j j ~ ~ ~ ~ ~ ~ i r'T'?"FF"T'T'~"T ...... r'~"'rT"t"'t"-t--i-'-t ....... t.-+-+-~-..'-.4.-+-+--~ ...... ;-.4..+..~-...'...;..~...;.-~ ...... ;..;..J...;..L..~:, ~ .
, ~ ~ ~ ~ ~ j ~ ? ~ ~ t~..~...' t T i "t "t"'t"?'-~"?"t-+"+'-,--~-~-.--~--~.4.~.-~.~.' ...... ~..~ ~ ~ ~ ~ ~ : : ~ ~ ' : : : ~ : ~ ~ ~ : ;
p~'-~-~-..-?-~-~ .... ~..-~...~-f--[..~.' .~.4..- ~ ; ;~_ ~_; ~;. ~, ~ ~ ~ T"? ....... ?'T'~ ...... ?'-t-?-t ..... ?...,-.~..~....4-+.~ ...... ,..~_.,..e ...... ~...;...~_~
,--4.~..~..~..., .~. +..~-~ .~ ~-~..1.....~...j...~ ,...~ : ~ ~ : : ~ · ~ ~ ' : T "?'"T ...... t'"~"T'~ ..... ?~'"t"'~ ...... r"t'"t .............. T,.-~...~ ...... + ~- ~-.~ ....... J..4.. ~ ~
. ~ I . I ~ ; ~ I ~ : ......... ~ ? '~'*T" ~'"?"~"~ .... ~"~-'~'-~-...~.--'. ' ..... : ' : : . ; ~ ~ ~ : J : ~ ~ · · : '
... ~.. ~ : ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ : : :'"T"''7-T"?'"?-'~"~"~-C"t"-"+-+.~ ....... ~ .... ~..~ ..... L..~.-'.: ...... '..~-.'. ~ ~ : ' ~ ~ t 2 ~ , · ~ ~
% T'7'"t ...... ?"?~"'~ ..... ~"~'"?"' '"?'"?'"?~ ....... . "'?T'"t"+'+'+"+ ...... ~"-+"-+'--*-'-~-.4---~--+---~--,.-~.~ ~ i _: ~ ~ ~ , ~ ~ [ ~ ~ ~ ~ ? ? ~ T"'"t-'PT"[ ....... ?"T"?'? ...... ?'~'~-?"-
]~ ;~ ~'~ '-'~"'[~ J~J~l ~T'T-FT ..... T"T'T'T ....... Y'T'"T~ ...... F'r"T-T'P'?'T-'t ....... ?'t-'t'"r't'"t"'T'f ....
-,"~: ~:~ ~ ~ ~ ~ ~ ~"+'+'~: +-+'+--~-~---~.*.-~--:..~-~...~--~-~-.b.LJ~J- ~4 ~ ~ ~ ~: ~ ~ ' 12 ' ' ~ ~
-'~"~"¢- -'~'-~". ~--~-. --~-~ ~-~ ~ w....~...-.. · ..... ~........... ~. ~ ~_ . . . ~ ............ ~ ~ ....... ~ ..... t ..... ~ ............ . . . ~--r.. * · · ~ ~ i ;
- ' ' : : : ~ : ~ ' : : ~ ~ · T T ? % ...... ?"'?'?'"~" '"?~"'?'t ....... ?*..?..~ -~ ~ ~ ~ f + ~ .~ .... ~ ~ 4 ; ~ i ; ~ ~ ~ ; ~
~?"F'F"~'FT'[-'"~'."TTT'T ....... T'"FT'T'?T"r"r'~'"~i~-.-.~m...--f.4--+.+.....4..+..~...; ....... ~...J~~;~a m~'~. ~ ....... ; ~ j ~ j ~ ~ '
.+++-F--~.$+-~.~..~;~..~.;.~.,...'.~..:..~..L; ~.~ ~. ]'TT'r't'~f'~'-r"r-t'-¢--t ..... t-.f.+.~ ....... f.+.+.4 ....... ¥+.+.4 ...... ¥4..4..4 ...... ~...;..~...~ ....... z...L~...L..
, ~ ~ ~ ~ ~ ,t r '-r-r-,"-r-'r-?~- ~--??-, ...... ?.+..~.~...-~ ........ , ...... ; ~_~_,._ , , ~j jl , ~ ~ , . ~ , t: ,'"t
-*'~" -~-' ' ~ ~ ~ ~ ~ · ' .... i ' * . ~ * "*~ .............. *-*--..-~.-.*-* ........ ~ - 1-~ ~ , .....
"'~ i ~ ; ~'~ ~; · ~:~:.~f~::~---~.-~ ....... ~-~4.-~4-~ : ~ ..... ~ I ~ ~ ~ ~ ~ ~i · i ~ ~ ~ ~ ~ ~ f ~ ~ ~ ; ', ~ ~ ~ ~
.-~.~4~. ~...~.~ , : ~ : ~ ~ ~ ~ ~ j ~ T T '%'" "T'T":-%" '%"~ ...... ??~-'?-"-t . 4--t ......... ,-..'-~ ...... ~..~...~...~ ...... ~-.-,...*-'..-..~ .~...~ .. ~ '-; : i : ' ,
' ' ' ? .... ?"?'~'? .... ?"'?"?'* ........ ~'" "~"'*'" "~ ~"~"'~ ~ ~-' ..... : ' ' ' ~ ! ' ? -'?"~ ...... t'"?'t ....
· .;,,_....,...,~, ,~, ~,~, ~ ~ ~ .... r'r": ...... ??'~ ....... ?-~-.,..?...~i:~~,__4_~...,.~ ...... . ....... ...~.~ ..:... , ,~,,
~ , *l ~ t '"t ...... ?'r'TT' "r'?"~'"t ........ t---t'-'~.-.t ...... ?f'+"f" "~'"*-'-~--~---'-.~---~-~:---.;-~-..~--;-L..J...J.-.L.~. ~ ~ ~ ; : · ~ ~ ~ ~ [ T ~ ~ T '"t-7"':"'t"y"t'"?'t'"~ ....
..... ~--~ ..... ' ' ' .~.~...' '. -' ~_;_~ ~ ~ , , ~ ~ : : T , , t '"'~'? .......... t-'~-'?"~ ....... r"?"~ ......... ?'t'"?'t ...... +.-.~.-.*-..* ....... ~...*...*...'.-.
' ~ ~ ~ ~ ~ :~ ~ : ~ , ~ , : · ~ , ~ f ' :: ~ ' ~ ' ; ~ ~ ~ '/' · : ~ ~ : ~.~ , ~;~' ' ~ ~~~ '"T ............ -~
:f:~ f ~ ~: ~ 'f~ -f i:.+-+.+~ f +-+.~.-~..4--.;...J...~..4..4~.J...; ~ ~ ~ ~ ..'..L ~ ~ ~ ~ ~ ~_ f f ~ ~ ~~ ~ ~ ~ ~
· i : t ~ ' ~ : ~ : ~ : ~ ~ :': : · : ~ ?? ~ ~ ? ~'"? ..... ~'-~'~"~-' - ~-~--~--+-.- --~.-*---~..~... ~ ... '. ' ' ' ' ' ; : : ' : : .
~ ~ ~ : ~ ; ~--~.~ ~ ~-~ ~. ~ ~~ ~ ~ ~ . ~, : : . . . ~ ..?. -?.?.?..? ....... ,...?...,...~ ....... ,..~..,...~ ..... ,...,..~..~..
, ~, t~ ~., , ~. .~' .: . .... ~ ~ . ~ ..... , "r'~r'-'-???~-. ~"~'? "~, ....... '-~-'t ..... ~ ~-', ~' ~-.~ ~- ~. ...... ~-~-~ .-,' - ?' ~-.,..., ....... ~.~ ~-,.
'- '~ ...... T~r. -~?i ..... ?.~--?~.- .?.T-?+-.-+++-+.-.-+.4-~..~...~-.4-H..+...~ ~4..~ . ~ ~ ~ ~ r ~-['~-' ,'-~"-r'-? ~- [I'~ ....... t-~.-r.....~..
l~ i ' ~eJ~ ~ ~ ~ ; ~ ~ } ~ ~ ~ ' f ; ~ ~ ','T"t": ........ W-'r"T"'"="'T-T-T~C' ~ ......
~ x ~ . . ~ . ~ . ~ . . ~ . ~ , , . . . ~ ....
"~-~--t ~-- ~--$- ' - ~ ' ~- ~. ' · ~ ~ : ~ ~ : J ~ : ~ : ~ : : . t ~ ...... ~"'?-'t-w .... T ..... *...* ..... *...*.--*---~ ....... t.--, -.-~ ~ ~.~ . ' $ .....
-;.;--~4-~ ~$~[- -~ T.; T] "Z[t]~t][~::']"T'T'TT-"I'"t"T'T''~''T'T''~''T'- -i-'i'-+'(-,-.~-~.-.f-?-~.-+-+..?~ ...... ~-+..~.a....4..~...~...~ ...... L.J...L.J ....... ~].]. J ....... J..; L ~ ..... [ ~ L I
--~.~.~.-.~.~-. ~~_~...~..: ..... ~ ~ ~ ~ T : T ~ : t ?-y-~--%~.t.-~ ...... ~'"~'-~-~-'-*'"?+...t ....... +--*---t--.~ ...... t..+..*...1 ...... ¥.;..i.-.~.. ~ ~ ~-~
: ~ ~ · ~ ~ .... ~ i ! ~ f i ' ' ~ i ~ : ' : : ~ ~ : : ~ : ~ ~ : : ~ : ' : ' '.: ' ~ ? '? :"? ....... ~'"""'?"~ ...... *"'"'?"'? ....... *"'*'"*'"~'"
· .~,,i ~ ~ f..`..~...?..~:.~.~.+..L.L...`~...L.L~...~...L.j...?...L.~...<..L.i."...~...L.L.i ~ j ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ j ~ ~ ~ ~ ~ ~
~-~.+--~.!.~...-~...~.~4-..~..4_~... ~_~.~J I.~ I...;.j , z~ ?'T' "T'] ...... rTT"r"'TT"r"t ...... ?~'"~'"t ....... *--r'+"~ ....... ~.'.t"-?..t.-.~-.+..?+-.~ ....... ~..~.-~...~ .......
~ I ' ' ' · ~: ~ : : : ~ : ~ ~ : ~ - '-~"'?"~'"? ..... ?"?~"~-' "~-~- '-'~'*~.--t .... + ~. ~..4 ........ ~.-~...~ ....... ~...
~ ....... ~ -~.-...-~.-.~-4-'---.~+.--~-~ -~ ~-~ ~ ........... ~ ~ ~"'~-'f ...... f"~"+"~ ....... ~"+'+"t ...... r'.?~...f ....
-¢.~-.f..~-4~..~.....~..4..~:Z~;XZ]]ZTi"TT~-r'IT'r-r'T":"Z"?P't- -¢-~-?--~--~.ff.-4 ..... f+4...+ ..... ~..4.4-4....-+.4...~..4 ...... ;..f..4...f .... t...;J...; ..... ;..;..f...~ ....... L..L.L.f...:
· -t'?~ -~-i~'~" '-~ +-+.~ ....... ~-~-+.+-..--~. ~.~.~ ...... ,- . -,~ ~ ~__~ , , ~ T. T : T ~..*.. r
: . .. · ~ % ~ T ~ : : ~ ? t ...... ?..,.--~ ......... . ~ .......
i' ~' ~ ~ ~ ~-~"" "~ ........ ~--~"'~- "~ ~-~-~ ~ ~ ~-~ :- ' : ~ ~ ' ~ ~ ~ :-- ' ' ' ' ~ ~ ~ ....... ?"~"'~"'~ ....... ?'~"""" ....... +"'+"~'"+'"
, · : ~ ' · : ' ' ~ ~ ...... ~'~-~~-~ .... ~-+--' ..-+.-'-'-' 4 + : i ~ : ~ ..... ~ ~ ' ;
~- . . ~ .. '.' ._ · · . : : · · ~ . .~ · ~ t ~ '?-"-~ ..... ~ ........... * .......... *...~...,..., ....... ~....~...,...~ ~ ~-~ ~
'~'~"~-"-~"~--.-~+~-~-..+~-~.- .-4..+~+..~+.~.-~ L~..~..~ .... i-L..L;., ~ ~ ~ 1% ~ ..... ?FT"?"I"'T'T'T"~ ......r'T'T"r"','"r'T"r"~ ....
-'~ ..... * ........ ~-W-~..4--~ -4..~.~--~ ~.~ ..... '.~ ~ ~~ ~ ~ : ! : i : : : . t t"'t ...... t'"~"'t'"t"'/-"t...?..?..t ....... t"'t ....... * ...... ~.~ ....... * ....
-~-. . 14 · - ~._ ~..+...~.....~., ~ , : ~ ~ , , ~ . ~ : , T ..... T f T"'t"'l"'*"T"~"'t ...... T"'~"'t'"t ........... r"t'"t .......................... ~..~...~ ....... ' F
~ r~-~ ? ~ ~-~-~e ..... e4.-~?....-~+..~-~ ,~...~..+.. ~..~, , 4-'-' ' ~ , ~ , ~ ~ , ] ~ i ~ ~ r"~ ...... r'r"?'r"~-'T"r'-r-.r..
-~. --~, '---~T ~$. ~-, ~-' "-~'~' ~""'~'------"~~-~::, , , '~'. , - ::~'~'~ f?~ ~ p: ~ TM -i, ~, "~4' "~ "~ ~' -~-~'~'4"~' .... -.~.-~-..~.--~?..,.,... -~..~..~._."~'~"~' ...... ~ .,_~-4'"~'"~..., .. ...... ..... ,~'"~"'L'~.,;, ........ ,_;"~',...,...~_.~' ~-..~...~...i,. . . ~. i, ~.~ ~..,~ ,...,~ ,'
~ ..... ~-~q"~ ........ ~--~-.-...-~.~-~-~ 4-~-+~-~ .. ~ ~ ~ ~ ....... ~ . t ~ t"'t ........... ~"'~--~ ....
: · ' T: : : · ' ' 1'' ~ ~ ".' ~'~' ~'~ ~'~ ...... *'"t"'*'-*- ..~....--~..4- ~ ' ~ ...... : ~ '
.... ' ...... ~ ~ ~ ~ ~ ~ ~ ~ ~ ' ~ i ~ ~ i : · . ~ ~' T"t"'t-'~ ....... t"'?t"'t ....... ¥'¥': .......... ~"'¥+.'~ ....
: _ t i . ~ I ~ · t , ~ ..... ~ t"'t~"'t ...... ~t'-t-'~"-"~'"*"'~' ",-* ~--* ...... l-t ~ ¢ ..... +-* i i .... '
....... - ', , ,, .......... ...... .......
998.
PROUECTION ON VERTICAL PLANE 998. - ]58. (~Ci:II. ED IN VEI~TICAL OEPT~ HORIZ SCALE = I/1000 IN/FT
BP EXPLORATION
PAD
S (42-27-12-12)
$ 25
/¢o ~ IZ ?
?
ORIGINAL
Controlled
Drilling
Consultants,
Inc.
LES HENDERSON
(907) 333-1552
CONi'ROLLED DRILLING CONSULTANTS, INC.
P.O. Box 190560
Anchorage, Alaska 99519-0560
(907) 333-1552
October 7,1990
Mr. Brian Rose
BP Exploration
Pouch 196612
Anchorage, Ak. 99519-6612
RE: Magnetic Single Shot Survey
Job No.A-0990-023
Well:S-23 (42-27-12-12)
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: 9-23-90 to 10-7-90
Dear Mr. Rose-
Please find enclosed the "Original" and Four (~.4+
copies of our Magnetic Single Shot Survey on the above
well. The method used in calculating this survey was
Radius of Curvature. The depth of the survey was 474'
to 10,872'.
Thank you for giving us this opportunity to be of
service.
Yours very truly,
Controlled Drilling Consultants, Inc.
D±rectional Superv±sor
HORIZONTAL VIEW
B.P. EXPLORATION
WELL S-25 (42-27-12-12)
RADIUS OF CURVATURE
MAGNETIC SINGLE SHOT
SCALE: I' · 1,000'
TVD = 8,670'
TMD = 10,872'
~,~,00
$0o°
.~,oO
6GO0
G~,O0
$0O0 ~
560°
&sOC
ALL DEPTHS SHOWN
ARE TVD
~0O'
~0O0
BP EXPLORATION
MAGNETIC SINGLE SHO'f SURVEY
RADIUS OF CURVATURE METHOD OF CO~PUTA'I'tOH
ENGINEER C.W, HARRINGTON
COMPUTED FOR CDC BY ARTIC SLOPE CONSULTING
;iR OUP
JO8 NO A-0990-023
WELL ' "'~
KB ELEY ~.5~ FT,
SURVEY DATE 24/09/9fl
PROPOSE~ DiR N~9-20B
RECORD OF SURVEY
TRUE
NEAS. DRIFT VERTICAL SUB DRIFT
DEPTH ANGLE DEPTH SEA DIREC
D H DEG,
TOTAL COORDINATES
C L 0 S U R E S
DISTANCE ANGLE
.F.:, 0 (; LE~S
SEVER I T Y
D E G,.." t OOFT
ASSUMED VERTICAL TO
0 0 0 ,00 -'64,56 i.,t
4.74 0 45 47~,99 409,43
987 0 15 986.97 922,4I N
1495 0 ~5 I494~96 14~0,40 S65
2005 0 ~0 20~4,95 i940,~9 884
25 04 0 ~5 25 03,94 24,39,38 N65
2748 0 42 2747,93 2683,37 881
2841 2 ~2 2840,90 2776,34 N48
2934 4 24 293~,74 2869,!8
3039 6 30 ~038,26 2973,70
32~0 I0 54 3227,07 3162,5t
3324 12 48 3319,06 3254,50 NJ0
3419 t5 48 34II,t0 3346,54 N22
3513 18 42 ~500,8'? 3436,3~ N22
36 87 2 i i 2 3589,22 3524 , 6~ N22
3700 23 I8 3675,29 36t 0,73 N22
3796 25 54 3762,57 3698,0~ N23
3890 28 48 3846,05 3781,4.9 N25
3985 31 42 3928,1i 3863,55 N24
4080 34 42 4007,59 ~943,0g N25
,00
2,53
1,60
2,49
,28
i,06
i,TO
5,50
I3,, 12
22,.85
35,75
52,i4
73,17
98,94
128,63
16'1,20
'~97,9i
2.'37, t 6
280' ,, 47
:;27,6 'l
,00 W
,70 E
S,62 E
i, 97 'E
i,24 W
I,.85
2 26 W
4 44 Y
821 W
14 64 W
22 5,1. W
32 O0
52 55
75 29
88 68
i 04 45
~22,46
~42,80
'i 64., 78
4,
2
2
'I
2
4
9
i9
47
90
I17
i49
':' 2 'g
~66
· S 14
366
85 N 30 29 29
98 N 28 49 0
79 N 27 49 2:'7
9I N 27 iS 79
7~ N 26 58 57
72 N 26 ,4.2 5
SIHGLE SHOT 'SURVEY
C O. f,'i. P O T E R - i I 0 C T ::~_. ,,'"'
.;:~", .° .
..:, ELEV c.,q.,56 Fi,
RECORO OF SURVEY
!"lEA9,
DEPTH
TRUE
bR1FT VERTICAL
ANGLE ~EPTN
D H
4174 37 24
4269 40 18
4365 42 O
4460 44 48
4554 46 48
4838 47 30
5246 50 42
5403 51 42
5780 48 30
6066 47 24
6254 46 6
6536 46 24
6@I7 46 24
7196 4,~ 54
7479 46 48
7763 46 6
8046 45 12
8426 44 6
87~2 43 36
8997 44 I8
9123 45 24
940'9 47 54
9599 49 30
9787 50 30
9977 48 36
~0262 47 O
105~4 46 6
~0707 ,46 ~2
4083,58
4157 56
4229 84
4298 86
4364 39
4557 53
49 04 99
4922 t 7
5163 96
5355 52
5484 33
5679 33
5'873 I2
6326 83
6522 50
6720
6990 66
7402 09
749i 4.2
7687 7~
7813 13
7933 97
8057 23
8248,67
8421,97
8552,90
SUB
SEA
4019, 02
4093, O0
4165,28
4234,30
4299
4492,97
4740,43
4857,6
5099,48
529 0,96
54~9,77
5614,77
580,'3,56
6068,72
6252,27
6457,94
6926, t O
7132,
7337,53
7426,
7623, i7
7869., 4
7992,67
8357
9488,74
DRIFT
DiREC
DEG.
TOTAL C. OORDIHaTES
377 94
432 40
489 97
549 46
611 04
801 84
! 065 66
~201,39
~471.37
1669.16
!796,39
!985,46
2~73,67
2427,26
2616,24
2804,, 64
2989,58
32:33,26
34 i 5,3 O
3598,88
368 t, 95
3 q 77 23
4 0'~ 2,, 15
4148,56
4286, 06
4488,38
4664~ 79
4.797,29
!87,72
2i I ,9I
237,9
264,76
292,
375 47
485 02
538 08
641 7t
719 03
769 66
845 47
922 85
1 03 O, 76
t I 1~ ,9t
1278,96
1466
154 O
I571
'i 643
1 689,64
! 735,82
~780,49
!840;81
't 889,23
,~921,17
C L 0 S U R E S
DISTANCE ANGLE
D
LEG
c,E;,,,:ER ~ i'f
OOFT
422 00
544 67
6 09 92
677 28
885 39
1i70,84
1316,39
1605,22
18t7,44
2 ~ 57,98
2361 ,46
26~7,05
2843,50
7049
325~ ,~7
3518 68
,]:716
3914 54
4003
42i I
4497 87
464 '~ ~ 7
485t 20
5032 84
5167 67
924
055
955
I 3,4
,582
,849
,407
,,5
;278
3:73
38I
888
9 06
.,592
,472
,531
S F L': T :[ 0 H
BP WELL S-23
SINGLE SHOT SURVEY
JOB NO A'-09".-)0--023
COi'!PUTER- ? ! OL':.T !!O
KB EL. EV d',4.; ~'6
RECORD 0~- SURVEY
TRUE
HEAS. DRIFT VERTICAL SUB DRIFT
DEPTH ANGLE DEPTH SEA DIREC
D H DEG,
TOTAL COORDINATES
C L 0
STANCE
R E S
A i',I P
LEG
SEVER~T',"
DEG/tOOFT
:L:.'; E: S T :}: 0 H
THE FOLLOWING IS EXTRAPOLATED TO TD
0872 45 54 8670,19 8605,6.'.~ N 9.OOW
BOTTOM HOLE CLOSURE 5287,t~ FEET AT N
4916,81 N 194..-4,~b'~" W
21 .~4 t6 W
I,; 21
~6 W
BP WELL '-'" :>" ,,,,r-
~-,..-, SINGLE SHAT '" ,._ .
. . ,.-,UR Y dOB
HEA.:~,.,RED DEPTH ANC, OTHER DATA FOR EVERY EVEN tn0 FEET OF
':'LIB E;EA
CONPUTER- i'~ OCT
i<'E: ELE',,,~ E..4,56
TRUE
HEAgURED VERTICAL SUB HD-TVD YERTIC~L
DEPTH DEPTH SE~ DZFFERE~CE CORRECTZON
TOT:~L.
COORD i NAT~'-'.
8 0, -65
i ¢5 165 . 1 O 0
265 265, 200
365 ..'365, ~08
465 465 , 400
565 565, 500
665 665 . ~00
765 765 , 700
865 865. 800
965 965 , 900
I 065 i 065, ~ 080
1165 i 165, I; O0
1265 ~ 265., ~ 2bO
~ 365 1~65, ~ ~00
} 465 I465 , i 4OO
1565 1565, iSOO
i665 ~665. 16OO
1765 i 765, 1700
I865 t865, 18OO
'1965 I 965, 1900
2065 2065, 2000
2i65 2165, 2~ O0
2265 2265 , 2200
2~65 2~65, 2:~00
2465 2465, 2400
2565 2565, 2500
2665 2665, 2&OO
2765 2765, 2700
2865 2e65, 2800
2965 2965 , 2900
3066 ~065, 3000
3167 3165, 3100
:~268 3265, 3200
3371 3365, ~3OO
3475 ~465 ,, 34 O O
,OO
,20
,05
1,I4
2,86
4,12
4,98
5,23
4.,86
.r.~ 21
i , 60
i, 49
i
i 92
2 il
2 46
,74
I , 04
7,4.~
15,5.5
61 .80
8?. 96
'i , 4 4
,02
9 O
212
,5 .,..
:3 '29
2 09
i 67
90
2 40
2 69
2
2 09
2 50
16,62
,47, ;36
BP
HEASURED
S,-2~
DEP TH
~.N D
¢'INGLE SHOT '-' ~
~.-,LRVEY JOB N.O A-ogqo-o':'3
OTHER £:,AT~ FOR EVER:'~ .... ,~*'"
e.'.~x 100 FEET OF SUB SEA DEPTH,
C 0 i'i P ill T E R- i 'i 0 C T
KB E!_EV 64,56 FT,
HEASURED
DEPTH
TRUE
VERTICAL '~;-' -
oU~ HD-T'¢D VERTIL:AL
DEPTH SEA DIFFERENCE CORRECTION
TOT.qL
COORDIHATES
7581
3688
3798
3911
4028
4150
4278
4412
4554
4848
4999
547J
5628
5781
6079
6225
6~70
6660
6805
6950
7242
7~88
75S4
7679
7824
7967
8J09
8250
3565. 3500 !6
3665, 3600 23 7
3765, 3780 33 JO
3865, 3800 46
3965, 3900 63 i?
4065, 4000 85 22
4i65, 4100 113 28
4265, 4260 ~47 34
4365, 4300 J89 42
4465, 4400 236 47
4565, 4500 283 47
4665, 4600 333 50
4765, 4700 387 54
4865, 4808 445 58
4965, 4900 506 6t
5065, 5000 563 57
5165, 5t00 616 53
5265, 5200 666 50
5365, 5300 714 48
5465, 5400 760 46
5565, 5500 805 ,,5
5665, 5600 850 45
5765, 5700 895 45
5865, 5800 940 45
5965, 5900 985 45
6065, 6000 I030 45
6t65. 6~00 i077 47
6265, 6200 J123 46
6365, 6300 i169 46
6465, 6400 1214 45
6565, 6500 1258 44
66.65, 6600 1302 44
6765, 6700 1344 42
6865, 6808 J385 4t
6965, 6900 !425 40
ii9
t56
i98
246
30i
364
437
5 i 9
611
709
I 02 0
124i
I'471
1576
!678
I777
I 87':'
~970
~068
2t65
2262
2~59
2:457
9652
~ 749
~,.~. 44
~ ..~
· ~,~:: 'i 0
,93
,96
,47
,45
°83
,i5
21
34
88
94
28
98
,24.
.99
,29
, ":24
:99
,I2
,37
,44
,59
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
I 04,85
126.$9
18 ! ,.':38
2i,~
25! 14
422
466
558 0 O
60:3,43
6:, '41 , 9'5
682,38
722.66
762. O4.
800,6:3
839,68
879,
9t9,39
04,4,05
086.92
!30
i7;:2.71
.'2:55 , 7
':' q 7
,~. , :'3
:S 3 S,
i377,98
BP WELL
HEASURED
:,-23 SINGLE SHOT SURVEY
DEPTH AND OTHER ()ATA FOR EVERY EVEN '100 FEET OF SUB :~Efl DEPTH,
COHPU?'ER- 'i'; OCT
KB EL:~-,' ~:~ :: ......
9 {i
TRUE
MEASURED VERTICAL SUB i'!D-TVD VERTICAL
DEPTH DEPTH SEA DIFFERENCE CORRECTION
TOTAL
COORDIHATES
8529 7065, 7000 i 464 39
8806 7265, 7200 }54J ~9
8.945 7Z465, 7,308 }580 39
9085 7465, 7408 1620 40
9228 7565, 7500 ~ 663 43
9~75 7665, 7600 i789 46
9525 7765, 7700 ~ 760 5~
9679 7865, 7808 ~ 8 i 3 53
98~5 7965. 7988 ~ 878 57
9988 8065, 8000 I 923 5g
0138 8~65, 8~ OO ~973 58
8285 8265, 8200 2020 47
04~ 8365, 8388 2866 46
0575 8465, 84 O0 2 ~ i 8 44
0720 8565, 8508 2t 55 45
0864 8665, 8600 2i 99 44
0872 8670, 8606 220J 2
3475
.:4564
3655
3752
~958
4069
4~8~
4294
4400
4606
4707
4889
49il
49~6
,68
86
09
80
6~
59
2.~
89
66
42
,00
76
7"4
05
8~
1 454,48
'i 526, :34
1562, ,.'.'.4
16S4, ,:t:7
i 782 93
J815 J7
~87:? 87
i900 I:::;
't 923 ,. 75
BP WELL $--23
SltqGLE SHOT SLtRVEY
dO8 NO A-0990-023
COMPIdTER- t i OCT ':30
KE! EL~',' 64 ~F, FT
INTERPOLATED VALUES FOR EVEN
TRUE
HEASLIRED VERTICAl_
DEPTH DEPTH
l O(iO FEET OF Id. EASURED DEPTH,
~ LIB
SEC, TOTAL COORD ItqATES
0 O, -65
I O00 i 000, 935,
2000 2000, i935,
3000 2999, 2935
5000 4666, 460i
6000 531 t , 5246
7000 5999, 5934
8000 5638, 662~
9000 7404. 7~40
0000 8072, 8008
0872 8670. 8606
O0
2,48 S
2,48 S
9,9~ N
287,67 FI 146
'~..I2,94 N 42"'
22'96,02 N 974
2959,82 N 1265
3600,83 N i540,
,4302,54 N ~785
49!6,81 N '194~
08 W
61 E
98 W
!.7, tO
72 W
46 bJ
4'5 W
~5 W
86 W
AOGCC GEOLOGICAL MATERIALS ~NV~NTORY UST
PERMIT # ,. ? ~, - /.g ~
CO!dPLETiONDATE // !
WELL NAME /z~Z~
x ! ~o CO. CONTACT
cl]ecl~ otl or list data as it is received,*!!st received date for 407. if not required list as NR
.... '~'"? !*..~/',,'/f/ I drillin~ history! ~' s.~eyl~'! weU tests ~41'c~re descrirao~
Cored int~als core analysis ~" d~,ditch inte~als * digital data
, , ~~ c~) ~
I
i ........ LOG -"'-'n': ~
, ,~-~- RUN INTERVALS SCALE
NO. {to thc nearest foot~ [inchl100'1
i31 ,, (/: ~ ~,~9~, " ' ~
, , ,
111 C ~ / ~2oo- //~ ~
i i iii
12i' p E~F .......... / / o g/~ - / / r~o ~ ....
i
, ~
.................i ........
........... ~ , * , ~ , ,
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :12/14/90
T#:81938
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
G-17 '/ GR/CCL 11/27/90 #2 11100-11340 Camco 5"
M-28 ,/ Inj/Temp 11/28-29/90 #1 8600-8935 Camco ,~ ',',
R-03 ~, Inj 11/29/90 #1 10200-10560 Camco 5"
S-23 Prod- F 11/29/90 #1 11100-11500 Camco 5"
W-17 ,/ GR/Collar 11/27/90 #1 11000-11882 Camco
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
DEC 211990
Alaska 011 & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: ARCO DATE:I 1/08/90
EXXON T#: 81805
PHILLIPS
STATE OF ALASKA
ARCHIVES
SYSTEM T~q.De & Transmittal Only
BP MAGNETIC LIS TAPE & LISTING
Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
CASED HOLE:
S-23 CH/CNL 10/15/90 · #1
SCH#74128 1600BPI
7560-11550 TAPE POS.#07412
AP1#50-029-22088
OPEN HOLE:
F-38
DIFL/BHC/FMT/CN 10~26~90
ATLAS#4637 1600BPI
·
-. ~._": ~_ .... _
-;
#1&2
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
RECEIVED
NOV '1 4 1990
Alaska 011 & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :11/09/90
T#:81797
FROM:
SUBJECT:
Information Control
Well Records LR2-1
,BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
S-23 Perf 11/03/90 #1 10680-11550 Sch 5"
S-28 CBT 11/05/90 #1 9410-10030 Sch 5"
S-28 CET 11/05/90 #1 2520-10046 Sch 5"
S-28 WD Packer Setter 11/04/90 #1 9620-9920 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
RECEIVED
NOV 1 4 1990
Alaska 011 & Gas Cons. Comml,~ion
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: ARCO DATE:I 1/05/90
EXXON T#: 81627
PHILLIPS
STATE OF ALASKA
ARCHIVES
SYSTEM ..Tape & Transmittal Only
BP MAGNETIC LIS TAPE & LISTING
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
S-23 RWD DUAL PROP RGD NPFD 10/08/90 #13
TELECO#TAK781 1600BPI
S-23 RWD DUAL PROP RGD NPFD 10/08/90 #13
TELECO#TAK781 1600BP!
10900-11650 TAPEPOS#07404
AP!#50-029-22088
11250-11600 TAPEPOS#07405
AP1#50-029-22088
RECEIVED
NOV 1 4 1990
Alaska 011 & Gms Cons. Commission
Anchorage
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson ElouJevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907} 561-5111
TO: DISTRIBUTION Date :10/19/90
T#:81751
FROM'
SUBJECT:
Information Control
Well Records LR2-1
BP (~ASED HOLE FINALS
Enclosed is your copy of the matedai listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
.~"~-24 Prod-F 10/12/90 #2 9000-9585 Sch 5"
¢---1~- 12 Prod- F 10/14/90 #1 9550-9721 Sch 5"
,..~N~15 Per/ 10/14/90 #1 9650-10161 Sch 5"
,,.-'S- 23 CBT 10/15/90 #1 2700-11550 Sch 5"
./S-23 CET 10/15/90 #1 2700-11573 Sch 5"
/~S<23 CNL 10/15/90 #1 7650-11528 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
Telecopy No.
(907) 276-7542
September 12, 1990
G W Kirton
PBU Lead Engineer
BP Exploration (Alaska) Inc
P 0 Box 196612
Anchorage, ~ 99519-6612
Re:
Prudhoe Bay Unit S-23
BP Exploration (Alaska) Inc
Permit ~ 90-127
Surf Loc 163i'SNL, 4336'WEL, Sec 35, T12N, R12E, UM
Btm~hole Loc 1382'SNL, 976'WEL, Sec 27, T12N, R12E, UM
Dear Mr Kirton:
Enclosed is the approved application ior permit to drill
the above referenced well,
The permit to drill does not exempt you from obtaining
additional pe~its required by law from other governmental
agencies, and does not authorize conducting drilling operations
until all other required permitting determinations are made.
The Commission will advise you of those BOPE tests that it
wishes to witness.
Sincerely,
Lonnie C: Smith
Commissioner
BY O~E~. OF T~ COMMISSZON
jo
encl
Dept of Fish & Game, Habitat Section - w/o encl
Dept of Environmental Conservation - w/o encl
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redrilll-Illb. Type of well.'i~'x'ploratoryl-i Stratigraphic Testl-I Development Oill~l
Re-Entry [] Deepen []1 Service [] Development Gas [] Single Zone [] Multiple Zone[]
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exo/oration KBE = 66' fee t Prudhoe Bay Field/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 2~25~
4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(se,, 2o AAc 25.025)
1631' SNL, 4336' WEL, SEC. 35, T12N, R12E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
1600' SNL, 900' WEL, SEC. 27, T12N, R12E S-23 (42-27-12-12) 2S100302630-277
At total depth 9. Approximate spud date Amount
1382'SNL, 976' WEL, SEC. 27, T12N, R12E September25, 1990 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(uOandTVD)
property line
ADL 28257 @ 976' feet S-21 @ 3877'/28' feet 2560 11650'MD/9197'TVDfeet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25.035 (e)(2))
Kickoff depth 2soo'feet Maximum hole ancjle,~7.;~6 o Maximum surface 3330 pslg At total depth (TVD) 8800'/~90 pslg
18. Casing program Specifications Setting Depth
s~ze Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data)
20" Cond. 80' Surface 110' 110'
16" 13-3/8" 68tt L-80 Butt 2650' Surface 2680' 2680' 1996 cu ft Arcticset II & III
12-1/4" 9-5/8" 4711 NT80-~ NSCC 10958 Surface 10988' 8749' 2392 cu ft Class G
8-1/2" 7" 2611 NT-80 NSCC 912' 10738' 8580' 11650' 9791' 293 cu ft Class G
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Sct°rnUdC3~:tr°arl R ECEIV ED
Surface
Intermediate
Production S E P - 7
Liner
Perforation depth: measured Alaska 0il & Gas Cons. (;0~
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program []
Drillincj fluid proc, lram [] Time vs depth pict [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[]
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~ ~-t./~- Title PBU Lead Engineer ~//~/~ ~ Date
Commission Use Only
Permit Number IAPI number IAppr°~)~ ~tL~/90 See cover letter
C~ ,/,Z 7 150'OZ-~- ~ ~ o ~?",~' for other requirements
Conditions of approval Samples required [] Yes J~NO Mud Icg required []Yes ~ No
Hydrogen sulfide measures [] Yes ,J~ No Directional survey requ~recl ~1~ Yes [] No
Required working pressure for BOPE ~. []2M; []3_M; I~5M; I-I10M; I-I15M;
Approved by -,~' ~ i' '; ~ , by order of
Commissioner tne commission Date
Form 10-401 Rev. 12-1-85
Submit in triplicate
20" Conductor
PR: IMINARY WELL PLAN
WELL S-23
(~-2-27-12-12) PBU
PROPOSED DEPTH
BKB
110'
Ball Valve
2100'
13-3/8" Casing Shoe
16" Open Hole
2680'
2700'
Cement Top
30OO'
4-1/2" 12.6# L-8OTDS. Tubing with 5 GLM's
9-5/8" Packer
7" Tieback Assembly
RE6.E VED
Gas ~ons. ~o
L4~.,hO~e
9-5/8" Shoe
12-1/4" Open Hole
7" 26# NT-80 Liner
7" PBTD
7" Liner Shoe
8-1/2" Open Hole
10988'
10998'
11610'
11 650'
11650'
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL S-23 [42-27-12-12] PBU
AF~ No. 125273
Install and cement 80' of 20" conductor to surface.
The drilling fluid program will consist of an 8.5 - 9.5 ppg spud mud in the 16"
hole, a 9.0 - 9.7 ppg water base mud in the 12-1/4" hole and a 9.0 ppg water base
mud in the 8-1/2" hole.
Drill 16" hole to 2700' TVD(BKB) and cement 13-3/8" L-80 Buttress casing to
surface.
Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams,
blind rams, and annular preventer. Maximum possible bottomhole pressure is
3710 psi at 8800' TVD(SS) based on original reservoir pressure. Maximum
possible surface pressure is 3330 psi based on a gas column to surface from
8600' TVD(SS) and an oil column to 8800' TVD(SS).
Directional drill 12-1/4" hole to the 9-5/8" casing point above the Sag River
Sandstone. Run 9-5/8" 47# L-80 NSCC casing to within 5' of 12-1/4" TD and
cement with Class G cement around the 9-5/8" shoe. The annulus will be freeze
protected by dry crude.
Directional drill 8-1/2" hole to TD. Run 7" liner from TD to 250' inside
9-5/8" casing shoe and cement using Class G cement.
Clean out to 7" float equipment. Change over to NaCI completion fluid. Test
casing and lap to 3000 psi.
Run 9-5/8" production packer on tubing. Set packer 50' above top of liner. A
subsurface safety valve with dual control lines will be placed 100' below base
of permafrost. Install and test Xmas tree with diesel. Displace tubing to diesel.
Set and test packer.
Shut down rig operations for perforating subsequent to rig release.
will be perforated in accordance with normal practices.
The well
Fluids incidental to the drilling of a well will be pumped down the 9-5/8" x 13-
3/8" annulus of the well.
Tubing Size: 4-1/2", 12.6# L-80 TDS TBG with 5 GLM's.
Tailpipe Size: 4-1/2", 12.6# L-80 TDS TAILPIPE
DH: 8-10-90
RECEIVED
SEP - ? 1990
Alaska Oil & Gas Cons. Commission
/~nehorage
PRELIMINARY WELL PLAN
WELL:
S-23
AFE NUMBER:
LOCATION: Surface:
Target:
T.D.:
1631' SNL,
1600' SNL,
1382' SNL,
[42-27-12-12]
4336' WEL,
900' WEL,
976' WEL,
PBU
Sec. 35, T12N, R12E
Sec. 27, T12N, R12E
Sec. 27, T12N, R12E
ESTIMATED START:
October 1990
OPR. DAYS TO COMPLETE: 24
Nabors 18E
MAX ANGLE/SECT COURSE/KOP/BUILD RATE:
47.36/N 19.2 W/2800/2.5
Item TVD(SS) MD(BKB) Mud Wt,
20" CONDUCTOR 80
13-3/8" SHOE 2614
BASE WEST SAK FORMATION 5225
9-5/8" SHOE 8683
TOP SAG RIVER SANDSTONE 8697
TOP SADLEROCHIT 8835
TARGET 8918
TOTAL DEFFH 9131
110 8.5
2680 9.5
5882 9.0
10988 9.7
11008 9.0
11212 9.0
11335 9.0
11650 9.0
LOGGING PROGRAM:
Open
Hole - Record all logs on magnetic tape where applicable.
12-1/4" Hole: None
8-1/2" Hole: DIL/BHC/CNL/GR (OPTIONAL LDT)
Cased Hole
CBT/CET/Gyro
DH: 8-10-90
and perforate
after rig
release (if wireline perforating.)
,R;E EIVED
BOP STACK CONFIGURATION
13 5/8", 5000 PSi WP
TRIPLE RAM STACK
DRILLING
RISER
ANNULAR
PREVENTER
2" KILL LINE
PIPE RAMS
MANUAL HYDRAULIC
'GATE GATE
BLIND RAMS
i
DRILLING
SPOOL
4" CHOKE LINE
HYDRAULIC MANUAL
GATE-
I
PIPE RAMS
I
^ ECEIVED
S E P - ? 1990
Nasl&l Oil & Gas Cons.
SURFACE HOLE DIVERTER SYSTEM
Two lines venting 90 deg. apart in directions
that ensure safe down wind venting, and ex-
tending to a point at least 100' from any potential
source of ignition.
J
10" Full Opening Valves
35' or as required
-I
Dresser Sleeve
10" Diverter Line
NOTES
1. All pipe connections 150# ANSI
Flanges or welded connections
and secured to prevent movement.
F,,,II'OF~-,~;~
2. Manual lO",l~valves
mechanically connected to ensure
that one valve is fail-safe open at
all times.
3. All turns are 90 deg. and
targeted.
10" Full opening ball valve w/Hydraulic
Actuator
Cellar
20" Diverter Spool w/10" Side Outlet
RECEIYED
S EP - 1' 1990
~]~J~ .Oil J~ 6as (;0115..~;).Et.i]~ R L. 12/18/89
MUD WEIGHT CALCULATIONS
WELL S-23 (42-27-12-12}
Mud Wt. (8-1/2" Hole):
P @ Sag River:
P @ Sadlerochit:
P @ Top S adlerochit:
OB @ Sag River:
OB @ Top Sadlerochit:
Current GOC:
9-5/8" Casing Shoe:
Top Sag River:
Top Sadlerochit:
9.0 ppg.
3900 psi.
3800 psi. at 8800' TVDSS
3814 psi.
201 psi.
352 psi.
Not Present
8749' TVDBKB
8763' TVDBKB
8901' TVDBKB
CEMENT CALCULATION
13-3/8" CASING
Measured Depth:
Basis:
Total Cement Vol:
Lead Slurry Vol:
Tail Slurry Vol:
2680'
2 X Annular Volume
1996 cu ft
1231 cu ft (634 Sx Arcticset III @ 1.94 Cu ft/Sk)
765 cu ft (822 Sx Arcticset II @ 0.93 Cu ft/Sk)
9-5/8"CASING
Measured Depth: 10988'
Basis: 90% Annular Volume to 13-3/8" + 50 cu ft
Total Cement Vol: 2392 cu ft
Lead Slurry Vol: 1817 cu ft (1015 Sx G+8% @ 1.79 Cu ft/Sk)
Tail Slurry Vol: 575 cu ft (500 Sx Neat G @ 1.15 Cu ft/Sk)
7" LINER
Measured Depth: 10738' (Hanger) - 11650' (Shoe)
Basis: 1.5 X Annular volume to 9-5/8" shoe + 150 cu ft
Total Cement Vol: 293 cu ft (253 Sx @ 1.16 Cu ft/Sk)
DH: 8-10-90
RECEIVED
SEP - 1 1990
/~ ~lt & Gas Cons. ~ommissio.[~
$45DUA124:[DRAN034]S23 CLOSAP SHORT.LIS;2
10-AUG-1990
---- Closest Approach Analysis ---
Date: 10-AUG-90 Time: 10:10:56
Search Radius= 200 COURSE LINE
For proposed well: S-23 [42-27-12-12]
Location = W-E S-N TVD(SBS)
Top 619104.00 5979854.00 -66.00
Bottom 616994.83 5985617.40 9390.00
Note: Ail depths in feet Below Kelly Bushing (BKB)
10:11
Page
Closest Approach
WELL IDENT /PROPOSED% /NEARBY\ CLOSEST
TVD DEPART TVD DEPART DISTANCE
A029-2069500
S-3 1642.5 0.0
A029-2069800
S-2 2868.8 1.5
A029-2071701
S-1 2299.1 0.0
A029-2077100
S-9 NO COORDINATE POINTS
A029-2077800
S-8 NO COORDINATE POINTS
A029-2095900
S-4 892.0 0.0
A029-2111300
S-15 4106.1 408.9
A029-2112300
S-16 2466.0 0.0
A029-2161100
S-19 3266.4 48.4
A029-2163700
S-20 1604.3 0.0
A029-2203600
S-21 ( 3877.3 269.4
A029-2204400
S-24 ( 199.8 0.0
1643.6 10.9 31.5
2870.6 29.9 53.0
2299.5 35.2 173.0
WITHIN SPECIFIED SEARCH WINDOW
WITHIN SPECIFIED SEARCH WINDOW
900.0 6.3 141.0
4243.2 560.7 242.4
2483.8 112.7 410.7
3272.7 16.6 85.9
1609.0 31.5 34.4
3888.3 276.2 27.7
200.0 0.2 108.8
SUMMARY
The well which comes closest to
A029-2203600 S-21
Closest approach distance =
KICK OFF for this run =
the proposed well is:
27.7 feet
2800.0 feet
Vertical
/PROPOSED\
TVD DEPART
Intersection
/NEARBY%
TVD DEPART
VERTICAL
DISTANCE
3913.3 289.2 3971.8 319.7 59.8
3794.4 227.5 4273.8 585.8 476.?
4021.5 352.9 4777.5 802.4 754.8
3531.0 120.3 2319.6 136.3 -1212.5
$45DUA124:[DRAN034[S23 CLOSAP SHORT7.LIS;2
10-AUG-1990
--- Closest Approach Analysis ----
Date: 10-AUG-90 Time: 10:11:40
Search Radius= 200 7 DEGREE LEAD LINE
For proposed well: S-23 [42-27-12-12]
Location = W-E S-N TVD(SBS)
Top 619104.00 5979854.00 -66.00
Bottom 616308.17 5985317.40 9390.00
Note: All depths in feet Below Kelly Bushing (BKB)
10:11
Page
Closest Approach
WELL IDENT /PROPOSED% /NEARBY~ CLOSEST
TVD DEPART TVD DEPART DISTANCE
A029-2069500
S-3 1642.5 0.0
A029-2069800
S-2 2879.4 1.7
A029-2071701
S-1 2299.1 0.0
A029-2077100
S-9 NO COORDINATE POINTS
A029-2077800
S-8 NO COORDINATE POINTS
A029-2095900
$-4 892.0 0.0
A029-2111300
S-15 4031.4 358.9
A029-2112300
S-16 2466.0 0.0
A029-2161100
S-19 3288.7 52.9
A029-2163700
S-20 1604.3 0.0
A029-2203600
S-21 ( 4031.4 358.9
1643.6 10.9 31.5
2881.1 30.7 52.8
2299.5 35.2 173.0
WITHIN SPECIFIED SEARCH WINDOW
WITHIN SPECIFIED SEARCH WINDOW
900.0 6.3 141.0
4157.3 493.9 236.3
2483.8 112.7 410.7
3294.3 17.1 79.7
1609.0 31.5 34.4
4048.8 362.9 46.5
A029-2204400
S-24 ( 199.8 0.0
SUMMARY
The well which comes closest to
A029-2069500 S-3
Closest approach distance =
KICK OFF for this run =
200.0
the proposed well is:
31.5 feet
2800.0 feet
0.2 ~, 108.8
~,,..
Vertical
/PROPOSED\
TVD DEPART
Intersection
/NEARBY\
TVD DEPART
VERTICAL
DISTANCE
5539.8 1884.0 6193.5 1916.5 655.1
6813.0 3266.8 8073.1 3298.8 1261.4
3731.7 198.5 4226.1 547.0 491.7
3920.1 292.9 4711.0 730.8 789.8
3667.0 170.6 2510.3 189.1 -1157.8
· z.¸
!
TRIP TANK
I~I U D
H,OP?E i~ PI L L. T~J K.
lDO ~6C
I, ULUH ~ T,~ K
D~G.A 5SER T^N K
H40
V'~C u Utt
T Y F~:
--
--
- Choke .Manifold
- Poor Boy Degasser ·
- ~:andt Vacuum.-?ype Degasser
- Brandt Dua[ Tandem Shale S~aker
- ?toneer Hud Cleaners
- Pioneer HKI Centrifuge
DISTRII~JTION DFrc
PIT
1 - Recording drilling fluid, pit 'level indica~0r with both visual and audio warning
devices at driller's console
1 - Trip Tank (75 BBL.)
1 - Drilling fluid flow sensor with readout at driller's console
11 - 5 Hp AgitatOrs
CHECK LIST FOR NEW WELL PERMITS
ITEM APPROVE DATE
F e_.a~ /CPc. ?//o/9o
(2 thru 8)
(3) Admin ~/°r- ~o~ 9.
. lbru f3) ' ' 10.
.~< ~-/~-~ ~.
(10 and 13) 12.
13.
(4) Casg
(14 thru 22)
(5) BOPE
(23 thru 28)
(6) OTHER ~?( ~/~
'(29 thr6 3i)
(6) Add: ~F~, ~o/m-~
Geology: Engineering:
DwJ C~'~LC s SEW
rev: 01/30/89
6.011
Company ,.~. ~
.
Is the permit fee attached ..........................................
2. Is well t~ be located in a defined pool .............................
3. Is well located proper distance from property line ..................
4. Is well located proper distance from other wells ....................
5. Is sufficient undedicated acreage available in this pool ............
6. Is well to be deviated and is wellbore plat included ................
7. Is operator the only affected party .................................
8. Can permit be approved before fifteen-day wait ......................
Lease & Well No.
YES NO
£
_
~s
Does operator have a bond in force ..................................
Is a conservation order needed ...................................... ~-
Is administrative approval needed ...................................
Is the lease number appropriate .................................... ~
Does the well have a unique name and number . ~ ,
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
For
29.
30.
31.
32.
Is conductor string provided ........................................
Will surface casing protect all zones reasonably expected to
serve as an underground source of drinking water .....................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ...
Will cement cover all known productive horizons .....................
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................
Is a diverter system required .......................................
Is the drilling fluid program schematic and list of equipment adequate./~I
Are necessary diagrams and descriptions of ~r a~g BOPE attached..~
Does BOPE have sufficient pressure rating - Test to .~o~o psig .. ~
Does the choke manifold comply w/API RP-53 (May 84) ..................
,,
Is the presence of H2S gas probable ................................. ~
exploratory and Stratigraphic wells:
Are data presented on potential overpressure zones? .................
Are seismic analysis data presented on shallow gas zones ............
If an offshore loc., are survey results of seabed conditions presented
Additional requirements .............................................
INITIAL CEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
~e/ot~o Da,z.; /-~// gqo //~ oAJ
Well Histo.ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process ·
but is part of the history file.
T° improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX~
.,
No special'effort has been made to chronologically
organize this category of information.
.o
LIS VERIFICATION LISTING FOR:
BP EXPLORATION ALASKA
WELL S-23 RELOG SECTION
PRUDHOE BAY UNIT
RECEIVED
NOV 1 4 1990
Alaska 011 & Gas Cons. Commission
Anchorage
Below are the mnemonics used on the LIS tape requested
by BP EXPLORATION ALASKA for the WELL S-23 Relog Section,
PRUDHOE BAY UNIT.
GRCM - Gamma Ray Cor [RWD] I MWD-API
RACM- Resistivity (AR) Cor [RWD] I ohm-m
ROPS - Rate Of Penetration l ft/hr
RPCM- Resistivity (PD) Cor [RWD] I ohm-m
~ i I I | t ~ j ~ ] , J ! J I _ J ...... ] J J J ]
** reel header **
service name : DPR
date : 9 O/10/26
origin :TR01
reel name : 781TAK
continuation # :01
previous reel :
comment :TELECO OILFIELD SERVICES PROPRIETARY FIELD TAPE
** tape header **
service name. · DPR
date : 90/10/26
origin :TR01
tape name : 781TAK
continuation # :01
previous tape :
comments :RIG NABORS 18-E
** file header **
file name : 781TAK.REL
service name : DPR
version # : 1.31
date :90/10/26
maximum length : 1024
file type : LO
previous file :
** information records **
table type :TOOL
MNEM
STAT
LENG
WEIG
HEIG
GR ALLO 0.000 0.000 0.000
RSN ALLO 72.000 0.000 0.000
DCDS ALLO 360.000 0.000 0.000
** information records **
table type :CONS
MNEM
STAT
PUNI
TUNI
VALU
BS UNAL IN
CS I Z UNAL I N
SD UNAL F
WMUD UNAL LB/G
SHT UNAL DEGC
BHT UNAL DEGC
TD UNAL F
YEAR UNAL
MONT UNAL
DAY UNAL
IN
IN
F
LB/G
DEGC
DEGC
F
** information records **
8.500
9.625
11250.000
9.000
0.000
0.000
11600.000
90.000
10.000
26.000
table type :CONS
MNEM STAT
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm,
SON UNAL
Ri UNAL
R2 UNAL
R3 UNAL
R4 UNAL
R5 UNAL
R6 UNAL
R7 UNAL
R8 UNAL
HIDE UNAL
WN UNAL
CN UNAL
FN UNAL
FL UNAL
FL1 UNAL
LUL UNAL
ENGI UNAL
WITN UNAL
DFT UNAL
LONG UNAL
LATI UNAL
STAT UNAL
COUN UNAL
DMF UNAL
LMF UNAL
PDAT UNAL
APIN UNAL
PUNI
TUNI
VALU
DUAL/PRO PAG/RES I S / NEUT/POR/FORM/DEN S I
S-23 RELOG SECTION
BP EXPLORATION ALASKA
PRUDHOE BAY
ANCHORAGE
PREZGAY/REESE
ALASKA
NORTH SLOPE
RKB
RKB
OS 1 UNAL
OS2 UNAL
OS 3 UNAL
OS4 UNAL
OS5 UNAL
OS 6 UNAL
TLAB UNAL
TCS UNAL
TN1 UNAL
TN2 UNAL
TN3 UNAL
TN4 UNAL
TN5 UNAL
TN6 UNAL
TN7 UNAL
TN8 UNAL
TN9 UNAL
TN10 UNAL
TNll UNAL
TN12 UNAL
SECT UNAL
TOWN UNAL
RANG UNAL
NATI UNAL
CONT UNAL
MSS UNAL
MFSS UNAL
MCSS UNAL
SLAB UNAL
CLAB UNAL
CS 1 UNAL
CS2 UNAL
CS 3 UNAL
BS 1 UNAL
BS 2 UNAL
BS3 UNAL
HLD UNAL
RUN UNAL
LUN UNAL
OPER UNAL
LCC UNAL
BLI UNAL
TLI UNAL
EPD UNAL
APD UNAL
F F
F F
F F
F F
USA
NAM
STATE
COUNTY
13.375
9.625
17.50
12.25
8.50
INCL
0.000
0.000
0.000
0.000
O.00O
0.000
0.000
0.000
t | I J i J J J ] J ..... -] ...... J ---] ....... -J J J ) . J J
EKB UNAL F F
EDF UNAL F F
EGL UNAL F F
TDD UNAL F F
TDL UNAL F F
CWl UNAL LB/F LB/F
BS D 1 UNAL F F
CBD1 UNAL F F
CBL1 UNAL F F
CW2 UNAL LB/F LB/F
BSD2 UNAL F F
CBD2 UNAL F F
CBL2 UNAL F F
CW3 UNAL LB/F LB/F
BSD3 UNAL F F
CBD3 UNAL F F
CBL3 UNAL F F
STEM UNAL DEGC DEGC
MRT UNAL DEGC DEGC
DFD UNAL LB/G LB/G
DFV UNAL S S
DFPH UNAL
DFL UNAL C3 C3
RMFS UNAL OHMM OHMM
RMS UNAL OHMM OHMM
RMCS UNAL OHMM OHMM
MST UNAL DEGC DEGC
MFST UNAL DEGC DEGC
MCST UNAL DEGC DEGC
** information records **
64.000
63.000
0.000
11600.000
11600.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
table type :PRES
MNEM
OUTP STAT TRAC CODI
DEST
MODE
GRCM GRCM ALLO TI
PDEM PDEM ALLO Ti
ROPS ROPS ALLO Ti
RACM RACM ALLO T23
RPCM RPCM ALLO T23
DRHM DRHM DISA T2
DPEM DPEM DISA T2
R0 R0 DISA T2
LLIN
LDAS
LSPO
LDAS
LLIN
MGAP
LSPO
LDAS
NB
WRAP
WRAP
NB
NB
NB
NB
GRAD
TENS TENS D I SA T 3 LGAP
NPHI NPHI DISA T23 LSPO
DPHI DPHI DISA T23 LLIN
11 DUMM DI SA T2 LGAP
12 DUMM DISA T1 LLIN
13 DUMM DISA Ti LLIN
14 DUMM DISA Ti LLIN
15 DUMM DISA T1 LLIN
16 DUMM DISA Ti LLIN
17 DUMM DISA Ti LLIN
18 DUMM DISA Ti LLIN
19 DUMM DISA Ti LLIN
** information records **
BOTH
2
2
1
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
SHIF
SHIF
SHIF
GRAD
NB
NB
NB
NB
NB
NB
NB
NB
table type :FILM
MNEM GCOD GDEC DEST DSCA
1 EEE PF1 S2
2 EEE .... PF2 S5
** information records **
table type :AREA
MNEM STAT BEGI END PATT DEST
1 ALLO DPHI NPHI GAS
2 DISA Z1 Z1 BLAN
3 DISA Z1 Z1 BLAN
4 DISA Z1 Z1 BLAN
5 DISA Z1 Zl BLAN
6 DISA Z1 Z1 BLAN
7 DISA Z1 Z1 BLAN
8 DISA Z1 Z1 BLAN
** data-format record **
entry blocks
type
4
8
9
size repr code entry
1 66 255
4 68 60.000
4 65 .liN
2
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
12 4 68
0 2 79
-9999.000
0
datum specification blocks
WARNING the following table is in LIS Datum Specification Block
Sub-Type 0 and the API Type Codes may be Unreliable!!!
mnem service service unit api api api api file size spl repr
id order # log type class mod no. code
DEPT FT 00 000 00 00 0 4 1 68
GRCM 00 000 00 00 0 4 1 68
RACM 00 000 00 00 0 4 .1 68
ROPS 00 000 00 00 0 4 1 68
RPCM 00 000 00 00 0 4 1 68
process
level
depth =
GRCM
depth =
GRCM
depth =
GRCM
depth =
GRCM
depth =
GRCM
depth =
GRCM
depth =
GRCM
depth =
GRCM
depth =
GRCM
11250.0000 feet .... 3429.0000 meters
1.0000 RACM 1.0000 ROPS 1.0000 RPCM
11275.0000 feet .... 3436.6200 meters
-9999.0000 RACM -9999.0000 ROPS -9999.0000 RPCM
11300.0000 feet .... 3444.2400 meters
35.3340 RACM 8.1320 ROPS -9999.0000 RPCM
11325.0000 feet .... 3451.8600 meters
23.2560 RACM 7.8690 ROPS 54.9120 RPCM
11350.0000 feet
38.9720 RACM
3459.4800 meters
5.8890 ROPS 121.7500 RPCM
11375.0000 feet
36.6850 RACM
3467.1000 meters
4.7760 ROPS 66.6790 RPCM
11400.0000 feet
21.8030 RACM
3474.7200 meters
4.9870 ROPS 108.7730 RPCM
11425.0000 feet
26.1620 RACM
3482.3400 meters
4.1820 ROPS 102.3670 RPCM
11450.0000 feet
30.6190 RACM
3489.9600 meters
4.4930 ROPS 203.2250 RPCM
1.0000
-9999.0000
9.0940
7.1060
5.3650
5.6620
5.4310
5.7150
6. 1860
depth =
GRCM
depth =
GRCM
depth =
GRCM
depth =
GRCM
depth =
GRCM
depth =
GRCM
11475.0000 feet
18.8950 RACM
3497.5800 meters
2.3750 ROPS 74.1620 RPCM
11500.0000 feet
28.9430 RACM
3505.2000 meters
1.7710 ROPS 96.1000 RPCM
11525.0000 feet
18.1990 RACM
3512.8200 meters
1.3750 ROPS 94.4280 RPCM
11550.0000 feet .... 3520.4400 meters
-9999.0000 RACM -9999.0000 ROPS 68.5660 RPCM
11575.0000 feet 3528.0600 meters
-9999.0000 RACM -9999.0000 ROPS -9999.0000 RPCM
11600.0000 feet .... 3535.6800 meters
-9999.0000 RACM -9999.0000 ROPS -9999.0000 RPCM
4.2350
2.5410
2.3970
-9999.0000
-9999.0000
-9999.0000
** file trailer **
file name :781TAK.REL
service name.-DPR
version # : 1.31
date :90/10/26
maximum length :1024
file type :LO
next file name :
cf'O -
LIS VERIFICATION LISTING FOR:
BP EXPLORATION ALASKA
WELL S-23
PRUDHOE BAY UNIT
NO¥ 1 ~ ~990
Alaska Oil & ~as Cons. Commission
knchorage
Below are the mnemonics used on the LIS tape requested
by BP EXPLORATION ALASKA for the WELL S-23, PRUDHOE BAY UNIT.
BDCM - Bulk Density Compensated [RWD]lg/cc
DPEM - Photoelectric Cross Sect [RWD]IB/e
DRHM - Delta RHO - Density Cor [RWD]lg/cc
GRCM - Gamma Ray Cor [RWD]IMWD-API
NFBM - Neutron Far Base [RWD]Icps
NNBM - Neutron Near Counts [RWD]lcps
NPSM - Neutron Porosity (SS) [RWD]Ip.u.
PDEM - Phase Difference - Elapsed Timelseconds
RACM - Resistivity (AR) Cor [RWD]lohm-m
ROPS - Rate Of Penetrationlft/hr
RPCM - Resistivity (PD) Cor [RWD]lohm-m
TVD - True Vertical Depth
** reel header **
service name :DPR
date :90/10/26
origin :TR01
reel name :781TAK
continuation # :01
previous reel :
comment :TELECO OILFIELD SERVICES PROPRIETARY FIELD TAPE
** tape header **
service name.-DPR
date :90/10/26
origin :TR01
tape name :781TAK
continuation # :01
previous tape :
comments :RIG NABORS 18-E
** file header **
file name :781TAK. 001
service name :DPR
version # : 1.31
date :90/10/26
maximum length :1024
file type :LO
previous file :
** information records **
table type :TOOL
MNEM
STAT
LENG
WEIG
HEIG
GR ALLO 0.000 0.000 0.000
RSN ALLO 72.000 0.000 0.000
DCDS ALLO 360.000 0.000 0.000
** information records **
table type :CONS
MNEM
STAT
PUNI
TUNI
VALU
BS UNAL
CS I Z UNAL
S D UNAL
WMUD UNAL
SHT UNAL
BHT UNAL
TD UNAL
YEAR UNAL
MONT UNAL
DAY UNAL
** information records **
IN
IN
F
LB/G
DEGC
DEGC
F
IN
IN
F
LB/G
DEGC
DEGC
F
table type
MNEM
:CONS
STAT
PUNI
TUNI
SON UNAL
Ri UNAL
R2 UNAL
R3 UNAL
R4 UNAL
R5 UNAL
R6 UNAL
R7 UNAL
R8 UNAL
HIDE UNAL
WN UNAL
CN UNAL
FN UNAL
FL UNAL
FL1 UNAL
LUL UNAL
ENGI UNAL
WITN UNAL
DFT UNAL
LONG UNAL
LATI UNAL
STAT UNAL
COUN UNAL
DMF UNAL
LMF UNAL
PDAT UNAL
APIN UNAL
8.500
9.625
10900.000
9.000
0.000
0.000
11650.000
90.000
10.000
26.000
VALU
DUAL/PRO PAG/RES I S /NEUT/POR/FORM/DEN S I
S-23
BP EXPLORATION ALASKA
PRUDHOE BAY
ANCHORAGE
PREZGAY/REESE
ALASKA
NORTH SLOPE
RKB
RKB
OS1
OS2
OS3
OS4
0S5
OS6
TLAB
TCS
TN1
TN2
TN3
TN4
TN5
TN6
TN7
TN8
TN9
TNiO
TNll
TN12
SECT
TOWN
RANG
NATI
CONT
MSS
MFSS
MCSS
SLAB
CLAB
CS1
CS2
CS3
BS1
BS2
BS3
HLD
RUN
LUN
OPER
LCC
BLI
TLI
EPD
APD
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
UNAL
USA
NAM
STATE
COUNTY
13.375
9.625
17.50
12.25
8.50
INCL
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
EKB UNAL F
EDF UNAL F
EGL UNAL F
TDD UNAL F
TDL UNAL F
CW1 UNAL LB/F
BSD1 UNAL F
CBD1 UNAL F
CBL1 UNAL F
CW2 UNAL LB/F
BSD2 UNAL F
CBD2 UNAL F
CBL2 UNAL F
CW3 UNAL LB/F
BSD3 UNAL F
CBD3 UNAL F
CBL3 UNAL F
STEM UNAL DEGC
MRT UNAL DEGC
DFD UNAL LB/G
DFV UNAL S
DFPH UNAL
DFL UNAL C3
RMFS UNAL OHMM
RMS UNAL OHMM
RMCS UNAL OHMM
MST UNAL DEGC
MFST UNAL DEGC
MCST UNAL DEGC
** information records **
F
F
F
F
F
LB/F
F
F
F
LB/F
F
F
F
LB/F
F
F
F
DEGC
DEGC
LB/G
S
C3
OHMM
OHMM
OHMM
DEGC
DEGC
DEGC
64.
63.
0.
11650.
11650.
0.
0.
0.
0.
0.
0.
0.
000
000
000
000
000
000
000
000
000
000
000
000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
table type :PRES
MNEM OUTP STAT TRAC CODI DEST MODE
GRCM GRCM ALLO Ti
PDEM PDEM ALLO Ti
ROPS ROPS ALLO Ti
NPSM NPSM ALLO T23
BDCM BDCM ALLO T23
DRHM DRHM ALLO RHT2
DPEM DPEM ALLO RHT2
RO RO DISA T2
LLIN
LDAS
LSPO
MDAS
LLIN
MGAP
LSPO
LDAS
WRAP
WRAP
WRAP
NB
WRAP
NB
NB
GRAD
TENS TENS DISA T3 LGAP
NPHI NPHI DISA T23 LSPO
DPHI DPHI DISA T23 LLIN
11 DUMM DISA T2 LGAP
12 DUMM DISA T1 LLIN
13 DUMM DISA T1 LLIN
14 DUMM DISA T1 LLIN
15 DUMM DISA T1 LLIN
16 DUMM DISA T1 LLIN
17 DUMM DISA T1 LLIN
18 DUMM DISA T1 LLIN
19 DUMM DISA T1 LLIN
** information records **
BOTH
2
2
1
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
SHIF
SHIF
SHIF
GRAD
NB
NB
NB
NB
NB
NB
NB
NB
table type :FILM
MNEM GCOD GDEC DEST DSCA
1 EEE .... PF1 S2
2 EEE .... PF2 ' S5
** information records **
table type :AREA
MNEM
STAT BEGI END PATT DEST
1 ALLO DPHI NPHI GAS
2 DISA Z1 Z1 BLAN
3 DISA Z 1 Z 1 BLAN
4 DISA Z1 Z1 BLAN
5 DISA Z1 Z1 BLAN
6 DISA Z1 Z1 BLAN
7 DISA Z1 Z1 BLAN
8 DISA Z1 Z1 BLAN
** data-format record **
entry blocks
type
4
8
9
size repr code entry
1 66 255
4 68 60.000
4 65 .liN
2
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
NEIT
! j J j J J ........ J ....~1 ...... ! ....... J J J ) i i ! ] } ]
12 4 68
0 2 79
datum specification blocks
WARNING the following table is
Sub-Type 0 and the API
in LIS
Type
mnem service service unit api api
id order # log type
DEPT FT 00 000
BDCM 00 000
DPEM 00 000
DRHM 00 000
GRCM 00 000
NFBM 00 000
NNBM 00 000
NPSM 00 000
PDEM 00 000
RACM 00 000
ROPS 00 000
RPCM 00 000
TVD 00 000
-9999.000
0
Datum Specification Block
Codes may be Unreliable!!!
api api file
class mod no.
00 0O 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
size spl repr
code
4 1 68
4 1 68
4 1 68
4 1 68
4 1 68
4 1 68
4 1 68
4 1 68
4 1 68
4 1 68
4 1 68
4 1 68
4 1 68
0
0
0
0
0
0
0
0
0
0
0
0
0
process
level
depth = 10900.0000 feet
BDCM 1.9520 DPEM 8.4720
NFBM 13.6420 NNBM 6187.0000
RACM 0.1000 ROPS 144.8030
depth = 10950.0000 feet
BDCM 2.6450 DPEM
NFBM 22.7440 NNBM
RACM 7.9240 ROPS
depth = 11000.0000 feet
BDCM 2.4900 DPEM
NFBM 30.5530 NNBM
RACM 7.6020 ROPS
depth = 11050.0000 feet
BDCM 2.3440 DPEM
NFBM 38.6360 NNBM
RACM 11.6850 ROPS
3322.3200 meters
DRHM -0.8600
NPSM 54.9630
RPCM -9999.0000
3337.5600 meters
3.9520 DRHM 0.2330
6680.5088 NPSM 17.5180
26.7760 RPCM 8.1240
3352.8000 meters
2.7920 DRHM 0.1400
6995.4932 NPSM 23.2400
47.6070 RPCM 7.7220
3368.0400 meters
3.4680 DRHM -0.0150
7110.5576 NPSM 20.3510
12.0010 RPCM 10.0280
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
183.5590
6.3700
8691.1621
209.4520
39.2670
8725.8359
59.6570
22. 3170
8760.3809
102.2900
63.9670
8794.8926
depth =
BDCM
NFBM
RACM
depth =
BDCM
NFBM
RACM
depth =
BDCM
NFBM
RACM
depth =
BDCM
NFBM
RACM
depth =
BDCM
NFBM
RACM
depth =
BDCM
NFBM
RACM
depth =
BDCM
NFBM
RACM
depth =
BDCM
NFBM
RACM
depth =
BDCM
NFBM
RACM
11100.0000 feet 3383.2800 meters
2.5960 DPEM 3.6840 DRHM 0.1360
23.3270 NNBM 6694.2822 NPSM 37.5940
4.5030 ROPS 17.3450 RPCM 3.7950
11150.0000 feet 3398.5200 meters
2.6830 DPEM 4.3270 DRHM 0.0630
83.0070 NNBM 7636.4355 NPSM 7.8980
88.'6040 ROPS 22.4630 RPCM 170.3200
11200.0000 feet .... 3413.7600 meters
2.4840 DPEM 3.0150 DRHI~ 0.1340
32.3570 NNBM 7073.7100 NPSM 21.8540
17.3440 ROPS 91.7660 RPCM 23.1510
11250.0000 feet .... 3429.0000 meters
2.4480 DPEM 3.3010 DRHM 0.1490
31.0630 NNBM 7047.4375 NPSM 23.4160
16.3620 ROPS 105.2640 RPCM 15.9190
11300.0000 feet 3444.2400 meters
2.5840 DPEM 3.4750 DRHM 0.2190
29.4690 NNBM 6967.8711 NPSM 23.2790
12.0350 ROPS 27.5280 RPCM 9.9050
11350.0000 feet .... 3459.4800 meters
2.3630 DPEM 2.5850 DRHI~ 0.1660
24.5920 NNBM 6983.5527 NPSM 29.3880
8.4400 ROPS 147.6380 RPCM 8.6590
11400.0000 feet 3474.7200 meters
2.3170 DPEM 2.7070 DRHM 0.1280
5.9250 NNBM 7061.6094 NPSM 28.1680
7.9910 ROPS 79.8290 RPCM 8.7160
11450.0000 feet 3489.9600 meters
2.4220 DPEM 2.5520 DRHM 0.2330
7.4770 NNBM 7072.5615 NPSM 17.9430
4.2310 ROPS 143.8810 RPCM 4.8980
11500.0000 feet 3505.2000 meters
2.5340 DPEM 3.4940 DRHM 0.3180
29.1090 NNBM 7009.5283 NPSM 24.1880
2.0870 ROPS 115.4110 RPCM 1.7800
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
153.5790
33.6670
8829.6660
76.7070
44.5170
8864.4824
39.8250
22.1120
8899.6191
29.4320
9.0870
8934.7441
97.6820
20.1670
8969.7891
31.9950
12.5500
9004.7832
21.2910
8.4000
9039.6445
24.5790
21.9700
9074.4395
29.5800
16.9310
9109.2344
depth = 11550.0000 feet 3520.4400 meters
BDCM 2.4040 DPEM 3.2010 DRHM 0.2770
NFBM 31.9620 NNBM 7074.0225 NPSM 21.3890
RACM 1.9770 ROPS 72.7260 RPCM 1.9850
depth = 11600.0000 feet .... 3535.6800 meters
BDCM 2.3120 DPEM 2.0500 DRHM 0.2510
NFBM -9999.0000 NNBM -9999.0000 NPSM -9999.0000
RACM 1.8950 ROPS 86.1100 RPCM 1.9350
depth = 11650.0000 feet .... 3550.9200 meters
BDCM -4.7510 DPEM -0.2400 DRf{M -10.2010
NFBM -9999.0000 NNBM -9999.0000 NPSM -9999.0000
RACM -9999.0000 ROPS -9999.0000 RPCM -9999.0000
GRCM
PDEM
TVD
GRCM
PDEM
TVD
GRCM
PDEM
TVD
18.5230
34.3920
9144.0312
23.4780
9.8330
9178.8262
-9999.0000
-9999.0000
9213.6230
** file trailer **
file name :781TAK. 001
service name :DPR
version # : 1.31
date :90/10/26
maximum length :1024
file type :LO
next file name :
~ ,~L~SKA CDMPU'TING CENTER
CDMPANY NAME : 5.P. EXPLCRATION
WELL N,~ME : S - 23
FIELD NA~E : PRUDHOE ~AY
~O~OUGH : NORTH SLOPE
ST,~T E : ALASKA
API NUMBER : 50-029-Z20-B8
REFERENCE ND : 74128
RECEIVED
NOV I 4 1990
Alaska Oil & Gas Cons. Commission
Anchorage
IS T~.PE VERiFICaTION LISTING
CHLUM~ERGER ALASK~ COMPUTING CENTER
5-NOV-1990 1'9:157
**~* REEL HEADER
SERVICE ~N~ME : EgIT
DATE : 90/11! 5
REEL NAME :
CgNTIN'U~TiON ~ :
PREVIOUS REEL :
COMMENT : B.P. EKPLO~AT[ON,PRUgHgE ~Y,.'S - 2~,50-02'9-22088
**~-* TAPE HEADER
SERVICE NAME : EDIT
O~TE : 90111/ 5
ORIGIN : FL!C
T~PE NAME :
CONTINUATION ~ : ~
P~EVIOUS ~TAPE :
' . T' P~UgHOE B~Y, S - 23,50-029-2208B
COMMENT . ~ P. EXPLORA ~ON, .
*~** FILE HE ~.DER '~
FILE N~ME : EDIT .001
SERVICE : FLIC
VERSION :
DATE : 90/I1/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST ~=ILE :
· ~ SCMLUMBERG:,:_R WELL SERVICES
CO~ANY N,~ME: ~.P. EXPLORATION
WELL: S - 23
FIELD: PRUOHOE BAY
BOROUGH: NORTH SLOPE
STATE:
API NUMBER:
LOC~TION: 1631' FNL~ 4335' FEL
SECTION: 35 TOWNSHIP:
RANGE:
PERMANENT DATUm: ~SL ELEV&TISN: O'
LOG ~5ASUPEO :R3~ R~B 6~' ABOVE PERMANENT
,IS 'T~E YERI~ICATION LISTIiNG
;CHLUMEERGER ~,LASK.~ COMPUTING CENTER
5-NOV-199D 19:57
PAGE:
ELEVATIONS
DATE LOGGED:
RUN NUMBER:
TO ORIL:LER:
TO LOGGER:
C~SING 1:
CASING 2:
CASING 3:
GL: 3~5'
15-0CT-90
!
11582'
11581'
13 3/$" ~ DRILLER DEPTH OF O' TO 2702'
g 5/8" 9 DRILLER DEPTH O~ O' TO 10928'
'7" @ DRILLER DEPTH O~ 10682~' TD 1162,~'
TYPE FLUID IN HO:LE: ~!RINE
DENSITY: 8.g LS/GAL
iLOGGING DISTRICT:
LOGGING ENG'INEE~:
WITNESS:
TOOL NUMBERS:
C~L-Y-030
SGC-SA-53
C~C-DB-88
~CEEC-C-7~5
TCM-50g
PRUDHOE
G. SARBER
P. DUNH~M, ~o MARSH
TCC-:B-2 8!
CNC-H-OZ?
C.~S-D &-83
CEMS-&-TO)
ST~-C~-T01
DATE JOB STARTEO: f-NOV-90
JOB REFERENCE NO: 7~1,28
LOP/~N~: R. KRUWELL
FIL: - EDIT.O01
.m..p. EXmLORATIDN
PRUDHCE BaY
.S - 23
50-029-22088
"~EPEAT ,:~LE ,~Rg~ FIELD TAPE miL.,:. ~!I"
D~T,~ SAMPLEC EVERY -.5000 FEET
CAT~ INCLUDEO -
T 3OL EXTENS ION 'TOOL
TYPE USED NAME
CNT-&/D/H .CNR COMPENSATED NEUTRON
.IS :TA~E VERIFICATION LISTING
iCHLUM~ERGER A~ASK~ COMPUTING CE~T~
5-NOV-1990 19:57
~GE:
TABLE TYPE : CONS
TUNI
VALU D~F!
CN 5.P. EX~LgRA, TION
FN P'qUOHOE B~Y
WN S - 23
~PIN 50-ozg-z2088
FL 1631
SECT 35
TOWN 12E
RANG
COUN NORTH SLOPE
STAT ALASKA
NATI US~
WITN P. DUNHAM, ,B. M,~RSH
SON 391597
P O ~ T M S L
EPD FT 0
L MF
APO FT 64°
EKB FT 6~.
EOF FT 63.
EGL FT 35.
TOO FT 11582.
BLI ~T 11528.
TLI FT 7565.
OFT BRINE
D~D G/C3 8.9
COMPANY NAME
FI ELD NAME
WELL NAME
API SERIAL NUMBER
FIELD LOCA'TION
SECTION
TOWNSHIP
RANGE
COUNTY
ST,~TE OR PROVINCE
NATION
WITNESS' NAME
SERVICE ORDER NUMBER
PERMANENT DATUM
ELEVATION O'F PERM. D~TUM
LOnG MEASURED FROM
~BOVE PERMANENT DATUM
ELEVATION OF KELLY BUSHING
EtEV:&TION OF OERRICK FLOOR
ELEVATION OF GROUNO LEVEL
TOTAL OEPTH- DRILLER
80'TTOM tOG INTERVAL
TOP LOG INTERVAL
DRILLING FLUID TYPE
DRILLING FLUID DENSITY
TADLE TYPE : CURV
OEFI
DEmT
NmH!
TNR~
RTN~
RCNT
RCFT
CNTC
CFTC
GR
TENS
CCL
gE~TH CHANNEL NAME
NEUTRON POROSITY
CALIBRATED THERMAL NEUTRON RATIO
qAW THERMAL NEUTRON RATIO
RCNT
RC~T
CNTC
CFTC
~AMM~ R~Y
TENSICN
CCL ~MPLITUDE
IS TAPE V~R'IFICATION LISTING
CHLUMBERGER ALASKA COMPUTING CENTER
5-NOV-1990 19:57
PASE:
DATA FORMAT SPECIFIC&TION RECORD
,~'~ SET TYPE - 64E~ ~*
TYPE REPR CO!D~ VALUE
2 66 0
3 T3 44
5 56
6 73
? 65
8 ,68 0.5
9 65 mT
12 68
13 66 0
1H 65 ~T
15 ,66 58
16 66 1
0 66 0
~ SET TYPE - CHAN ~
NaME SERV UNIT SERVICE API ~PI APl ~Pt FILE NUMB N'U~B SIZE REPR
ID DROER ~ :LO'G TYPE CLASS MOD NUMB SAMP ELEM CODE
P~DCESS
(HEX)
DEPT FT 1391597 O0
NPHI CNR PU 3'91597 O0
TNR~ CNR 391597 O0
RTNR CN~ 391597 O0
~CNT CNR CmS '391597 O0
RCFT CNR CPS 391597 O0
CNTC CNR CPS 391597 O0
C~TC CNR CPS 391597 O0
GR CNR G~PI 391597 O0
TENS CN~ LB 39'1597 O0
CCL CNR V 391597 O0
000 O0 0 1 I I 4 68
DOD O0 0 I I I 4 68
DO0 O0 0 1 i 1 .4 68
000 O0 0 I 1 1 4 68
000 O0 0 I 1 1 4 68
000 O0 0 I I 1 ~ 68
OOO 00 0 1 I 1 4 68
000 O0 0 1 1 1 4 68
000 O0 0 I 1 1 4 68
000 O0 0 1 I I 4 68
000 OO 0 1 1 1 4 68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
~ DATA ~
DEPT. I15¢6.000 NPHI.CNR 22.510 TN2A.CNR
RCNT.CNR 2550.424 ~CmT.CNR 905.460 CNTC.CNR
GR.CNR 22.719 TENS.CNR 3040.000 CCL.CNR
DEPT. 11500.000 NPHI.CNR 22.427 TNPA.CNR
RCNT.CNq 2657.773 2C~T.CNR 922.069 CNTC.CNR
GR.CNR 20.&35 TENS.CNA 4905.000 CCL.CN~
2.637 RTNR.CNR
2651.I19 CmTC-CNR
0.044
2.633 RTNR.CNR
2509.69Z CmTC.CNR
0.085
Z.780
942.400
Z.5T5
980.470
TAmE VERtFIC~TIDN LISTING
:H'LUMSE~'GER AL~S'K,~, COMPUTING ~CENT~R
DEPT. 11400.000 NPHI.CNR 213.
RCNT.CN~ 2370.315 RC~T,CNR 835.
GR.CNR 18.938 TENS.CNR 4840.
DEPT. 11300.000 NPHI.CNR 22.
RCNT. CNR 219'7. 991 RCFT. CNR 858.
GR.CNR 46°688 T~NS.CNR 4740.
DEPT. 11200.000 NPHI.CNR 22.
RCNT.CNR 2¢72.0gB ~CFT.CNR 865.
G~.CN~ 23.719 TENS.CNR 4665.
DEPT. 11100'000 NPHI.CNR 44.
RCNT.CN~ 13'73.170 RCFT.CNR 334.
GR.CNR 51.685 TENS.CNR 4700.
DEPT. 1t000.000 NPHI.CNR 19.
RCNT.CN~ 2400.076 ~CFT.CNR 91~.
G~.CNR ~5.344 TENS.CNR 4505.
~iEPT. 10900.000 NPHI.CNR 52.
RCNT.CNR I¢??.?17 RCFT.CNR
GR.CNR 1~6,375 TENS.CNR
D~PT. 10800.000 NPHI.CNR
RCNT.CN~ I~14.047 RCFT.CNR 286.
GR.CNR 56.500 'T~NS.CNR 4~85.
~EPT. 10700.000 NPHI.CNR 55.
RCNT.CNR 127~.368 RC~T.CNR 2?0.
GR.CN~ 51.4~g TENS.CNR
DEPT. 10600.000 NPHI.CNR 47.
RCNT.CN~ 1410.975 RCFT.CNR
GR.CNR 91.500 TENS.CNR 4290.
DEPT. 10500.000 NPHI.CNR
RCNT.CNq 148&.048 RCFT.CNR 400.
GQ.CNR 68.375 TENS.CNR 4290.
DE~T. 10423.500 NPHI.CNR
RCNT.CNq 15~3.628 RC=T.CNR 409.
GR.CNR 56.375 TENS.CNR 41~0.
END O: O~T& ~
5-NDV-1990 19:57
~35 TNR~.CNR
723 CNTC.CNR
000 CCL.CNR
881 TNRA,.CNR
996 CNTC.CNR
O00 CCL.CNR
44) TNRA.CNR
ir98 CNTC.CNR
000 CCL.CNR
215 TNR~.CNR
07 ! C N T C . C N R
OOO CCL. CNR
077 'TNRA.CNR
$04 CNTC.CNR
OOO CCL.CNR
983 TNRA.CNR
506 CNTC'CNR
OOO CCL.CNR
037 TNR~.CNR
500 CNTC.CNR
000 CCL.CNR
355 TNRA.CNR
005 CNTC.CNR
OOO CCL.CNR
34~ TNR~oCNR
506 CNTC.CNR
O00 CCL.CN~
262 TNR~.CNR
686 CNTC.CNR
000 CCL.CNR
195 TNR~.CNR
681 CNTC.CNR
000 CCL.CNR
~.688
2308.99b
-0.O8?
2.658
2298.3~8
-0.037
2.634
2.371.431
0.04!
3.828
1387.197
-0.035
2.423
2259,167
-0.040
4.309
1389.366
0.075
4. Z O Z
I
O. 064
4.439
1190.505
-0.066
4.000
1387.067
-0.038
3.776
1463.2~2
-0.036
3.607
1545.426
-0.037
RTNR.CNR
· C FT C. C N R
RTNR.CNR
CF'TC.CN~
RTNR. CNR
C FT C. C NR
RTNR.CNR
C ~TC. CNR
RTNR..CNR
CFTC .CNR
RTNR.CNR
CFTC.CNR
RTNR.CNR
CFTC.CNR
RTNR.CNR
C~TC.CNR
RTNR.CNR
CFTC.CNR
RTNR.CNR
CFTC.CNR
RTNR.CNR
C~TC.CNq
PAGE: 5
2.8B4
857,690
2. 845
904. 818
2.787
902.867
4.000
381.353
2. 523
953.119
4.225
333.781
4.278
306.269
5.107
25g'262
4.421
340.014
4.133
395.648
3.851
426.449
IS TAPE V~ER[FIC~TION LISTING
CHLUMBE~GER ALASKA COMPUTING CENTER
5-NOV-1990 19:57
PAGE:
*~-~-~, FILE TRAILER ~X~
FILE NAME : EDIT .001
SERVICE : FLZC
VERSION : 00'I A06
DATE : 90/1:1/ 5
MAX R~C SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE NAME : EDIT .002
SERVICE : FLIC
V~RS~ON : 00tA06
DAT~E : 90/11/ 5
MAX REC SIZE : 1024
FZLE TYPE : LO
L~ST FILE :
FILE - ED~T.OO2
.P. EXPLOR,&TION
P~UDHOE BAY
.S - 23
0-029-22088
"M~IN PASS LO=~ DATa FROM ,¢IELO TAPE FILE
D&TA SAMPLED EVERY -.5000 FEET
DAT~ INCLUDED -
TOOL =XTENSION TOOL
TYPE US:D NA~E
CNT-A/O/H .CNL COMPENSATED N~UTRgN
T~BLE TYPE : CONS
TUNI
CN
FN
WN
~PIN
V~LU DEFI
B.P. EXPLOR&T!ON
PRUDHOE BAY
S - 2]
50-029-ZZOB8
COMPANY NAME
FISL9 NAME
WELL N~M~
~PI SEqI~L NURSER
IS TAPE VERIFICATION LI:STIN~!]
CHLUM~,ERGER A:LASK~ COMPUTING CENT':-R
5-NOV-199,0 lO:5?
PAGE: 7
TUN I
FL
S E C T
T OWN
C ~UN
STAT
NATI
WITN
SON
POAT
EPD FT
~L MF
APD ~T
EK B VT
ED F FT
EG'L FT
TOD FT
B L I FT
TLI FT
DFT
D ~= O G/C ~
V ALU
!631' FNL, 4336' FEL
35
1ZE
NORTH SLOPE
ALASK ~
U SA
P. OUNH.~M, 5. ~RSH
391597
M S L
0-
64.
6).
35.
115~2.
1 15 Z B -
7 565.
BRINE
8.9
FIELD LOCATION
S E C T 'I O N
'TOWNSHIP
RANGE
COUNTY
.STATE OR PROVINCE
NATION
WITNESS:' N~ME
SERVICE ORDER NUMBER
PERMAN!ENT DATUM
ELEVAT'ION O~F PERM. DATUM
LO~ MEASUR!,_D FRaM
ABOVE OERMANEN'T DATUM
ELEVATION OF KELLY ~USHING
· ELE'VATZON OF DERRICK FLOOR
ELEVATI'ON OF GROUND LEVEL
TO'T~L DEPTH - ORILLER
BOTTOM L~G INTERVAL
TOP LOG INTERVA, L
DRILLING FLUID TYPE
DRILLING FLUID DENSITY
TABLE TYPE : CURV
DEPT
NPH'I
TNRA
RTNR
RCNT
RCFT
CNTC
C;TC
Gq
TENS
CCL
DEOTH CHANNEL NA~E
NEUTRON POROSITY
CALIBRATED THE~RMAL NEUTRON RATIO
RAW THERMAL NEUTRON RATIO
RCNT
RC'~T
CNTC
CFTC
GAMMA ~'AY
TENSION
CCL AMPLITUD'.E
'""' D.ATA FORMAT SP:CIFICAT~" ......
SET TYPE - 64E~ ~=
TYP~ REPR CODE
V&LUE
1 66 0
2 66 O
3 73 44
IS TAPE VERIFI,C~TIDN LISTING
CHLUMBERGER AL~SK-~ COMPUTING CENTER
5-NOV-lg90 t9:57
PAGE:
TYPE REPR CODE VALUE
4 66 1
5 66
7 6:5
8 6E 0.5
9 65 FT
11 66 23,
12 68
13 66 O
14 65 FT
15 66 68
16 66 1
0 66 1
SET TYPE - CHAN ~
N&ME SERV UNIT
SERVICE ~PI ~PI A~I ~Pl FILE NUMB NUMB
OROE~ ~ LOG TYPE CLASS MOD NUMB S~MP ELEM
DEPT FT 391597 O0
NPHI CNL PU 391597 O0
TNR~ CNL 391597 O0
RTNR CNL 391597 O0
RCNT CNL CPS 391597 OD
RCFT CNL CPS 391597 O0
CNTC CNL :CPS 391597 O0
CFTC CNL CPS 391597 O0
GR CNL G~PI 391597 O0
TENS CNL L~ 391597 O0
CCL CNL V 391597 O0
SIZE
000 O0 O 2 I 1
000 O0 0 2 I 1
000 O0 0 2 1 1
000 O0 O Z 1 1
OOO O0 O 2 1 1 4
000 O0 0 2 1 1 4
000 O0 0 Z 1 1
000 O0 0 Z 1 1 4
000 O0 O 2 1 1
000 O0 0 Z 1 1 4
000 00 0 Z I 1 4
REaR
CODE
PROCESS
CHEX)
68
68
68
68
68
5 $
58
68
68
0000000000
0000000000
0000000000
0000000000
0000000000
O000000OO0
0000000000
O000000OO0
0000000000
0000000000
0000000000
D~PT.
RCNToCNL
G~.CNL
D~PT.
RCNToCNL
GRoCNL
DEPT.
RCNT.CNL
GR.CNL
DEPT.
RCNT.CNL
GR.CNL
11550.500
2470.221
23.Z50
11500.000
2673.970
17.688
11400.000
!4.86.855
15.945
11300.000
2453.060
33.1~$
NPHI
RC~T
TENS
NPHI
RCFT
TENS
NPHI
RCFT
TENS
NPH!
RC~T
TENS
.CNL
.CNL
.CNL
.CNL
.CNL
.CNL
.CNL
.CNL
.CNL
.CNL
.CNL
.CNL
19.Z87
950.35Z
3075.000
ZZ.415
959.243
4770.000
25.198
~30.329
4580.009
19.270
974.411
4690.000
TNR~.CNL
CNTC.CNL
CCL.CNL
TNR~.CNL
CNTC.CNL
CCL.CNL
TNR~.CNL
CNTC.CNL
CCL.CNL
TNq~.CNL
CNTC.CNL
CCL.CNL
2.437
2374.039
O.04Z
2.632
2470.~97
0.037
2.785
2357.578
-0.090
2.435
2371.8oa
0.047
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR..CNL
Cr:TC.CNL
2.568
989.123
2.8Z7
931.355
2.962
851.472
2.655
958.415
IS TAPE VERIFICATION LISTING
CHLUM~E~GER ,~LASKA CgMPUTING CENTER
DEPT. 11200.000 NPHI.:CNL
RCNT.CNL 2435.805 RCFT.CNL
GRoCNL 26.438 TENS.CNL
DEPT. 11100.000 NPHI.CNL
RCNT.CNL 1435.32.3 RCFT.CNL
GR.CNL 64° 500 TENSoCNL
22.
841.
4460.
4 3.
373.
449 O.
DEPT. 11000.000 NPHI.CNL 17.
RCNT. CNL 23?9.742 RCFT.CNL 953.
GR.CNL 38.344 TENS.CNL 4505.
DEPT. 10900.000 NPHI.CNL 51.
RCNToCNL 1500.299 ~C~T.CNL 339.
GR.CNL 160.000 TENS.CNL 4~,45.
DEPT. 10800.000 NpHI.CNL 58.
RCNT.CNE 1347.353 RCFToCNL 272.
GR,.CNL 52.188 TENS.CNL 4385.
:DEPT. 10700.000 NPHI.CNL 45.
RCNT.CNL 125~.257 ~C=T.CNL 298.
GR.CNL 52.43~ TENS.CNL 4370.
DEPT. 10600.000 NPHI.CNL 48.
RCNT.CNL 1451.146 RCFT.CNL 314.
GR.CNL 89.125 TENS.CNL 4245.
DEPT. 10500.000 NPH!.CNL 42.
RCNT.CNL 1561.914 RCFT.CNL 401.
GR.CNL 59.750 TENS,CNL 4120.
DEPT. 10400.000 NPHI.CNL
RCNT.CNL 1632.779 RC~T.CNL
GR.CNL 112.6881 TENS.CNL
35.
46T.
4105.
DEPT. 10300.000 NPHI.CNL 31.
RCNT.CNL 1855.031 RCFT.CNL 529.
GffoCNL 49.219 TENS.CNL ~215.
S-NOV-1990 19:57
DSPT. 10200.000 NpHI.CNL 34.
RCNT.CNL 1521.235 RCmT.CNL 460.
GR.CNE 53.156 TENS.CNL 4125.
DEPT. 10100.000 NPHI.CNL 31.
RCNT. CNL 1697.459 RCmT.CNL 502.
GR.CNL 41.031 TENS.CNL 4020.
DEPT. 1000Q.000 NPHI.CNL
~CNT.CNL 1496.728 RCFT.CNL 408.
GR.CNL 52.688 TENS.CNL 4120.
~58 TNRA.CNL
387 CNTC.CNL
O00 CCL.CNL
8:16 TNRAo~CNL
427 CNTC.CNL
900 CCLoCNL
272 T N ~ ~. C N k
531 CNTC.CNL
000 CCL.CNL
30.6 T N R A, C N L
'729 C N T C, C NL
000 CCL. CNL
308 TNRA.CNL
183 CNTC.CNL
000 CCL.CNL
855 TNRA.CNL
727 CNTC.CNL
000 CCL.CNL
009 TNR~.CNL
841 CNTC.CNL
gO0 CCL.CNL
433 TNRA.CNL
971 CNTC.CNL
000 CCL.CNL
454 TNRA.CNL
699 CNTC.CNL
DO0 CCL.CNL
881 TNRA.CNL
Zl~ CNTC.CNL
000 CCL.CNL
~64 TNI~A.CNL
627 CNTC. CNL
000 CCL.CNL
974 TNRA.CNL
947 CNTC.CNL
go0 CCL.CNL
Bt3 TNRA.CNL
~09 CNTC.CNL
OOO CCL.CNL
2. ,557
2388. '875
-0.035
3.806
145 5.039
2.301
2265.712
0.04O
4.217
1417.~19
0.075
4.6 O1
130 Z. 770
- 0.037
3.973
1186.111
-0.043
4.036
1388.709
-0.032
3.730
1485.B53
0.039
3.402
1589.535
-0.031
3.151
1696.539
0.033
3.Z93
1531.906
0.037
3.157
1553.680
-0.042
3.696
1427.345
-O.03Z
RTNR.CNL
C. FTCoCNL
RTNR.CNL
CFTC,C.NL
RTNR.CNL
CFTC.CNL
RT NR. C NL
CF'TC,CNL
RTN~oCNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR .CNL
CFTC .CNL
R'TNR.CNL
CmTC.rNL, ,~
RTN~.CNL
CmTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
C,c:TC.CNL
RTNR.CNL
CFTC.CNL
PASE:
2.
914.627
4.098
402.252
2.305
975.888
4.595
337.399
4.800
294.325
4.189
291.335
4.410
359.730
3.955
402'687
3.475
496.283
3.2B3
571.922
3.679
473.551
3.473
497.154
3.930
417.108
IS TAmE VERIFICATION LISTING
CHLUMi3ERGER ALASK~ :OMPUTING CENT'ER
DEPT.
RCNT.CNL
GR.CNL
DEPT.
RCNT.CNL
GR.CNL
RCNT.CNL
GR.CNL
DEPT.
RCNT.CNL
GR.CNL
DEPT.
RCNT.CNL
GR.CNL
9900.000 NPHI.CNL
1361.879 qCFT.CNL
53.125 TENS.CNL
9800o!000 NPHI.CNL
1286-386 RCFT.CNL
73.000 TENS.CNL
9700.000 NPHI.CNL
1378.435 RCFT.CNL
55. 063 TENS.iCNL
9600.000 NPHI..CNL
1514.156 RCFT.CNL
52.594 TENS.CNL
9500.000 NPHI.CNL
1212.513 RCF'T.CNL
59.000 TENS.CNL
DEPT. 9400.000 NPHI.CNL
RCNT.CNL 1279.315 ~C~T.CNL
GR.CNL 48.625 TENS.CNL
DEPT.
RCNT.CNL
GR.CNL
DEPT.
RCNT.CNL
GR.CNL
DEPT.
RCNT.CNL
GR.CNL
DEPT.
RCNT. CNL
GR .CNL
DEPT.
RCNT.CNL
GR.CNL
DEPT.
RCNT.CNL
GR.CNL
DEPT.
RCNT.CNL
G~.CNL
9300.000 NPHI.CNL
~Z87.876 RCFT.CNL
182.750 TENS.CNL
9ZO0. O00 NPHI.CNL
1209.912 RC~T.CNL
98.313 'TENS. CNL
9100.000 NPHI.CNL
1359.716 ~CFT.CNL
~1.313 TENS.CNL
9000.000 NPHI.CNL
133Z.852 RC~T.CNL
313.500 TENS.CNL
3900.000 NPHI.CNL
1298.750 ~CFT.CNL
53.719 TENS.CNL
~800.000 NPHi. CNL
1314.464 RCFT.CNL
56.188 TENS.CNL
· B700.O00 NPHI.CNL
1334.735 RCFT.CNL
56.563 TENS.CNL
5-NOV-1990 19:57
54.257 TN~A.CNL
303.ZB6 CNTC.CNL
3970.000 CCL.CNL
49.726 TNRA.CNL
332. 621 CNTC.CNL
3915.000 CCL.CNL
38.~70 TNRA.CNL
366 . 465 C N T ~C. C N L
3925.000 CCL.CNL
31.544 TNRA.CNL
418.251 CNTC.CNL
3845.000 CC~L.CNL
54.038 TNRA.CNL
275.325 CNTC.CNL
3830.000 CCL.CNL
4'7.961 'TNRA.CNL
321.35¢ CNTC.CNL
3820.000 CCL.CNL
50.964 TNRA.CN!L
266.736 CNTC.CNL
3810.000 CCL.CNL
49.538 ~TNRA.CNL
293.~95 CNTC.CNL
~805.000 CCL.CNL
51.733 TN~.CNL
289.859 CNTC.CNL
3~45.900 CCL.CNL
45.204 TNRA.CNL
3Z1.354 CNTC.CNL
3790.000 CCL.CNL
49.722 TNRa. CNL
290.16~ CNTC.CNL
3,800.009 CCL.CNL
43.883 TNqA.CNL
312.145 CNTC.CNL
3395.000 CCL.CNL
50.780 TNR~.CNL
30Z.93~ CNTC.CNL
3!25.000 CCL.CNL
4.. 379
129 1.56,4
-0.030
A.130
1268.205
-0.033
3.535
130 ?. 523
O. 03,~
3.1~3
1401.449
0.062
4.367
1223.766
-0.056
4.033
1288.000
0.051
4.198
1203.531
-0.044
4.120
1254.592
-0.038
4.Z40
1284.134
-0.053
3.882
1255.434
0.048
4.130
1254.021
0.066
3.810
1274.094
0.061
4.188
1Z66.875
0.044
RTNR.CNL
CmTC.CNL
RTNR.C'NL
CFTC.CNL
RTN2.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
R'TNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CmTC.CNL
RTNRoCNL
C~TC.CNL
RTNR.CNL
CFTC.CNL
PAGE: 10
4.6'76
303.565
4.706
311.459
3.950
360.021
3.151
441.379
4.545
293.881
4.382
318.423
4.516
273.545
4.412
308. 834
4.452
307.548
4.387
319.997
4.147
304.811
4.118
334.455
4.581
309.373
TAPE VERIFIC&TION LISTING
fLUMBERGER ALASKA COMPUTING CENTER'
DEPT. ~B60 O. 000 NPHI.CNL
RCNT.CNL 1277.030 RCFToCNL
GR.CNL 61.313 TENS.CNL
DEPT. 8500.00'0 NPHI-~CNL
RCNT.CNL 1289o370 RCFT.CNL
G~,.CNL 513.531 TENS..CNE
OEPT. 8400.000 NP~qI.CNL
RCN'T.CNL 1239.621 RCFT.CNL
GR.CNL 55.250 TENS.CNL
DEPT. 8300.000 NPHI.CNL
RCNT.CNL 1309'649 RCFT.CNL
GR.CNL ,~1.5Z5 TENS.CNL
DEPT. 8200.000 NPHI.CNL
RCNT.CNL 1394. 246 RCFT.CNL
GR.CNL 51.Z50 TENS.CNL
DEPT. 8100.000 NPHI.CNL
RCNT.CNL 1250-417 RCFT.CNL
GR.CNL 94.935 TENS.CNL
DEPT. 8000. 000 NPHI.CNL
RCNT.CN~L 1513.137 qCFT.CNL
GR.CNL 64.750 TENS.CNL
DEPT. 7900.000 NPHI.CNL
RCNT.CNL 1253.319 RCFT.CN'L
GR.CNL 150.~:75 TENS.CNL
DEPT. 7800.000 NPHI.CNL
RCNT.CNL 1449.028 eCmT.CNL
G~.CNL 61.625 TENS.CNL
DEPT. 7700.000 NPHI.CNL
RCNT.CNL 1345.670 RCCT.CNL
GR.CNL 278.750 TENS.CNL
DEPT. 7600.000 NPHI.CNL
RCNT.CNL !420.120 RCFT.CNL
GR.CNL 58.406 TENS.CNL
DEPT. 7550.500 NPHI.CNL
RCNT.CNL '1~3~.550 RC:T.CNL
GR.CNL 67.053 TENS.CNL
END g~ DATA
5--NOV-1990 1~:57
51.552 TNRA.CNL
281.310 CNTC.CNL
379'0.000 C'CL.CNL
51.Z94 'TNRA.'CNL
257.51.5 CNTC.CNL
3800.00'0 CCL.CNL
~8.307 TNRA.CNL
321.72~ CNTC.CNL
3 '? 05 . 000 C C L . C N L
49.240 TNRA.CNL
322.465 CNTC.CNL
~700 gOO CCL.CNL
51.716 TNRA.CNL
294.070 CNTC.CNL
3655.000 CCL.CNL
42.477 'TN~.CNL
331.325 CN'TC.CNL
3570.0'00 CCL.CNL
31.712 TNRA'CNL
41,4.965 CN'TC.CNL
3520.000 CC:L.CNL
50.266 TNR~.CNL
288.539 CNTC.CNL
3565.000 CCL.CNL
44.937 TNRA.CNL
340.55 9 CNTC.CNL
3530.000 CCL.CNL
49.220 TNRA.CNL
~28. 577 CNTC.CNL
3475. gO0 CCL.CNL
38.580 TNRA.CNL
395.909 CNTC.CNL
3370.000 CCL.CNL
39.515 TNRA.CNL
379.014 CNTC.CNL
3~95.000 CCL.CNL
1256.83!0
-0.035
4. Z16
1225.764
-0.069
1217.159
-0.077
4.104
1243.970
-0.03.3
4.Z39
1336.892
O. 043
3.733
1200.300
0.038
3.142
1428.215
0.043
4.160
1230.33:5
-O.O4Z
3.365
138~.963
0.045
4.103
1295.779
-0.035
3.519
1402.361
-0.043
3.570
1352.37.3
-0.066
RTNR .CNL
C ~ T C. 'C N L
RTNR.CNL
CFTC.CNL
RTNR. CNL
CFT C. CNL
RT NR. C NL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
C~TC .CNL
RTNR.CNL
CFTC.CNL
RTNR.CNL
CFTC.CNL
4.548
298.3:30
3,. 943
Z"93. 744
4.200
317.171
4.452
316.512
4.382
319.358
4.219
319 · 003
3.245
447.570
4.545
327.108
3.753
373.819
4.484
321. 729
3.641
407.942
4.132
3;34.253
IS 'T6~PE VERIFICATION LISTING
'HLUMSERGER ALA. SK~ COMPUTING CENTER
**** FILE TRAILER
FILE NAME : EDIT
SERVICE : FLIC
VERSION :
DATE : 90/11/
MAX REC SIZE = 1024
FILE TYPE : LD
LAST FILE :
5-NDV-1990 19:57
**** TAPE TRAILER **~
SERVICE NA,~.E : EDI'T
DATE : ~0/1I.t 5
ORIGIN : FLIC
TAPE NAME : 74128
CONTINUATION ~ : I
PREVIOUS TSPE :
COMMENT : 5.P. EXPLOR~.TIDN,PRUDH~E B,~Y,.S- 23,50-029-22088
~*~ REEL TR.~ILER
SEP. VICE NAME : EDIT
D.~TE : 90/11/ 5
ORIGIN : FL[C
REEL NAME : 74128
CQNTINU~TIDN
PREVIOUS ~EEL :
COMMENT : ~.~. EXPL~R~TION,PRUOH~]E ~Y,.S - 23~50-029-22088
12