Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
201-019
Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:201-019 6.50-029-23000-00-00 PRUDHOE BAY, PRUDHOE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 14819 10779 8805 10746 None None 8783 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 77 20" 30 - 107 30 - 107 1490 470 Surface 4349 10-3/4" 29- 4378 29 - 4275 5210 2480 Intermediate 10956 7" 26 - 10982 26 - 8939 7240 5410 Production Perforation Depth: Measured depth: 10965 - 14716 feet True vertical depth:8928 - 9053 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 24 - 10801 24 - 8820 10746 8783Packers and SSSV (type, measured and true vertical depth) 4-1/2" BAKER S-3 PERM PDFNHU Liner 4021 4-1/2" 10796 - 14817 8816 - 9055 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 3061194214979 406 Shut-In 0 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Richards, Meredyth Meredyth.Richards@bp.com Authorized Name:Richards, Meredyth Authorized Title: Authorized Signature with Date:Contact Phone:+1 9075644867 Treatment descriptions including volumes used and final pressure: 13. Petroleum Engineer Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9055 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Set Patch Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well5 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 028333 PBU 17-22 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Jody Colombie at 9:37 am, Jun 26, 2020 Meredyth Richards Digitally signed by Meredyth Richards Date: 2020.06.26 08:21:22 -08'00' , ADL 28331, ADL 28332 DSR-6/26/2020 SFD 6/30/2020 SFD 6/30/2020MGR26JUN20RBDMS HEW 6/29/2020 ACTIVITYDATE SUMMARY 5/2/2020 ***WELL SHUT IN UPON ARRIVAL***(ELINE SET LOWER PACKER ASSEMBLY) INTIAL T/I/0=0/200/50 PACKER SPECS: 45 FLO-GUARD PACKER, MAX OD=3.7", OAL RUNNING LENGTH=8.42, OAL LIH LENGTH=7.1' MEASUREMENTS: CCL TO MID ELEMENT=8.92', CCL TO BOTTOM OF PACKER=13.92' CCL STOP DEPTH=8230.1' SET MIDDLE ELEMENT OF LOWER PACKER ASSEMBLY AT 8239' FINAL T/I/0=0/200/50 ***JOB COMPLETED*** 5/9/2020 ***WELL S/I ON ARRIVAL***(post eline patch) DRIFT TO BOTTOM ANCHOR W/ 3.80" CENT, 8'-2-1/8" STEM, 10' x 3.65" DUMMY GUN, 3' 1-7/8" STEM, 3.80" CENT, 3.70" LIB @ 8232' SLM ****CONT WSR ON 5-10-20**** 5/10/2020 ****CONT JOB FROM 5-9-20****(patch/tubing) ATTEMPT TO SET BKR 45 KB FLO-GUARD PACKER. UNABLE TO PASS 2012' SLM (parraffin on tools) LRS LOAD TUBING W/ 150 BBLS HOT CRUDE BRUSH TO 8200' SLM W/ KJ, 4-1/2" BRUSH, 3.80" GAUGE RING. ATTEMPT TO TAG BTM SECTION OF PATCH BAIL 4 CUPS OF HARD PACKED METAL SHAVINGS OFF BTM SECTION OF PATCH WILL RETURN AT LATER DATE TO RESUME JOB ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED ON WELL STATUS*** 6/19/2020 ***WELL S/I ON ARRIVAL*** (post eline patch) RAN 3.80" CENT & 3.70" LIB TO LOWER PATCH ASSEMBLY AT 8,239' ELMD (good impression lower patch assembly) DRIFTED W/ 20'x3.70" WHIPSTOCK & 12.5'x3.74" DRIFT TO LOWER PATCH ASSEMBLY AT 8,239' ELMD ***CONT ON 6/20/20 WSR*** 6/20/2020 ***CONT FROM 6/19/20 WSR*** (post eline patch) RUN UPPER 45 FLO-GUARD PKR W/ SNAP LATCH (32.97' lih) SET 4-1/2" WHIDDON ON PATCH AT 8,209' SLM PULLED BK-DGLV'S FROM STA#5 (5228' md) & STA#6 (3706' md) SET BK-LGLV (16/64" - 1500 tro) IN STA#6 AT 3706' MD SET BK-OGLV (20/64") IN STA#5 AT 5228' MD PULLED EMPTY WHIDDON FROM 8,209' SLM ***CONT ON 6/21/20 WSR*** 6/21/2020 ***CONT FROM 6/20/20 WSR*** (post eline patch) SWCP 4521 RIG DOWN ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU 17-22 Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:201-019 6.50-029-23000-00-00 PRUDHOE BAY, PRUDHOE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 14819 14725 9053 10746 None None 8783 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 77 20" 30 - 107 30 - 107 1490 470 Surface 4349 10-3/4" 29- 4378 29 - 4275 5210 2480 Intermediate 10956 7" 26 - 10982 26 - 8939 7240 5410 Production Perforation Depth: Measured depth: 10965 - 14716 feet True vertical depth:8928 - 9053 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 24 - 10801 24 - 8820 10746 8783Packers and SSSV (type, measured and true vertical depth) 4-1/2" BDNHU S-3 PHUP3DFNHU Liner 4021 4-1/2" 10796 - 14817 8816 - 9055 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 3061194214979 208 406 Shut-In 0 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Richards, Meredyth Meredyth.Richards@bp.com Authorized Name:Richards, Meredyth Authorized Title: Authorized Signature with Date:Contact Phone:+1 9075644867 Treatment descriptions including volumes used and final pressure: 13. Petroleum Engineer Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9055 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Operations shutdown Change Approved Program Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 5Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 028333 PBU 17-22 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Meredyth Richards Digitally signed by Meredyth Richards Date: 2020.03.30 14:39:05 -08'00' By Samantha Carlisle at 10:53 am, Apr 02, 2020 SFD 4/2/2020 ADL 028331, ADL 028332 SFD 4/2/2020 RBDMS HEW 4/6/2020 DSR-4/2/2020MGR10APR20 ACTIVITYDATE SUMMARY 12/16/2019 ****WELL S/I ON ARRIVAL****(pre coil) SET 4-1/2'' WHIDDON CATCHER AT 9505' SLM. PULL STA#3 BK-DGLV W/ EXT PKG FROM 8214' SLM .**STA #3 EMPTY POCKET** PULL 4-1/2'' WHIDDON CATCHER FROM 9505' SLM. PULL 2-7/8'' XX PLUG FROM 10,779' MD ***WELL TURNED OVER TO DSO*** 1/18/2020 CTU #9 - 1.75" CT. Job Objective: Depth Log / Adperf MIRU CTU. MU & RIH w/ 2.2" GR/CCL Logging Carrier & 2.25" JSN. Tag PBTD at 14729'. Log from compression up to 12200'. Flag Pipe at 13700'. Pooh. Receive good data ( -1.5' Correction). Corrected PBTD = 14725.98' Correlate to Sperry Sun GR 12-April-2001. MU & RIH w/ Slb 2.0" x 31' Perf Gun #1. ***Continue job on 1/19/2020 WSR*** 1/19/2020 CTU#9 1.75" CT. Job Objective: Depth Log / Adperf Continue Rih w/ Perf Gun #1. Correct depth at flag. Perforate Interval 13800' - 13831'. Pooh. All shots fired. MU Perf gun run #2 with Slb 2.0" x 31' Powerjet, 6spf, guns. RIH and correct at the flag. Perforate Interval 13753 - 13784. POOH. All shots fired. MU Perf gun run #3 with Slb 2.0" x 31' Powerjet, 6spf, guns. RIH and correct at the flag. Perforate Interval 13145 - 13176. POOH. Freeze Protect Tbg w/ 38 bbls 60/40 Methanol. All shots fired. Rig Down CTU. ***Job Complete*** Daily Report of Well Operations PBU 17-22 • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Saturday,June 2, 2018 8:48 AM To: AK, GWO Well Integrity Engineer; Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS FS2 DS Ops Lead;AK, OPS FS2 Facility OIL;AK, OPS FS2 Field OTL;AK, OPS FS2 OSM;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL; G GPB FS2 Drillsites; Nottingham, Derek;Ohms, Danielle H; Richar s, Meredyth; Stechauner, Bernhard; Summers, Matthew Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R; Tempel,Joshua;Worthington,Aras J;AK, GWO Well Integrity Well Information Subject: NOT OPERABLE: Producer 17-22 (PTD#2010190)TxIA communication confirmed with leak detect log. All, Producer 17-22 (PTD#2010190)was made Under Evaluation on 5/03/18 for having sustained IA casing pressure above NOL. On 6/1/18 slickline ran a leak detection log and confirmed a tubing leak at 8,226'. The well was left secured with a tubing tail plug and passed a CMIT-TxIA to 2,496psi on 5/30/18. At this time the well is reclassified as Not Operable and will remain secured. The production engineer will evaluate for a repair plan. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 IINED JUN 0 6 ZDV$ SCAW -..b«.•+r«.• From: AK, GWO We - -'rity Engineer Sent: Thursday, May 31, 201: ..-IAM To: 'Regg, James B (DOA) (jim.regg@a . -.8ov)'; AK, OPS EOC Specialists; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 Field OTL; AK, OPS •SM; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells 0 e Engr; AKOpsProdEOCTL; G GPB FS2 Drillsites; Notting . Derek; Ohms, Danielle H; Richards, Meredyth; Stechauner, Bernhard; Summers, Matthew Cc: 'chris.wallace@alaska.gov'; AK, GWO Completions Well Integrity; WO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well In ' ation; AK, OPS FF Well Ops Comp Re ; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Rom•, ouis A; Sternicki, Oliver R. • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Thursday, May 31, 2018 6:50 AM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS FS2 DS Ops Lead;AK, OPS FS2 Facility OTL;AK, OPS FS2 Field OTL;AK, OPS FS2 OSM;AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; G GPB FS2 Drillsites; Nottingham, Derek; Ohms, Danielle H; Richards, Meredyth; Stechauner, Bernhard; Summers, Matthew Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington, Aras J Subject: UNDER EVALUATION: Producer 17-22 (PTD#2010190) Under Evaluation clock extended 14 days. external-email: 0 All, Producer 17-22 (PTD#2010190)was put Under Evaluation on 05/03/18 for sustained IA casing pressure above NOL. Slickline changed out the screened orifice on 05/22/18 but the well subsequently failed a cold TIFL on 05/24 and a warm TIFL on 05/26.Slickline was delayed in rigging back up on the well due to the proximity of a coil tubing acid treatment nearby. On 05/30/18 Slickline set a TTP and obtained a passing CMIT-TxIA to 2496 psi, but could not obtain a passing MIT-T.The Slickline unit is still rigged up on the well and is currently troubleshooting the source of the tubing leak.The Under Evaluation clock will be extended 14 days to allow Slickline to finish the diagnostic work and repair the well or leave it secured with the TTP. Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization-Alaska Office:907-659-8110 SCANNED JUN 0 2U18 Fro . :K, GWO Well Integrity Engineer Sent: Thur May 03, 2018 6:55 AM To: 'Regg, James B •: 'im.regg@alaska.gov)'; AK, OPS EOC Specialists; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 Fiel• • OPS FS2 OSM; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL; G GPB FS2 Drills' - , • ingham, Derek; Ohms, Danielle H; Richards, Meredyth; Stechauner, Bernhard; Summers, Matthew Cc: 'chris.wallace@alaska.gov'; AK, GWO Completions Well In -• . • AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity v nformation; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerm. ric; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis 3; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; • Louis A; Sternicki, Oliver R; Tempel, Joshua; Worthington, Aras 3 Subject: UNDER EVALUATION: Producer 17-22 (PTD #2010190) Sustained IA pressure above NOL All, 1 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Thursday, May 3, 2018 6:55 AM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS FS2 DS Ops Lead;AK, OPS FS2 Facility OTL;AK, OPS FS2 Field OTL;AK, OPS FS2 OSM;AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL;G GPB FS2 Drillsites; Nottingham, Derek;Ohms, Danielle H; Richards, Meredyth; Stechauner, Bernhard; Summers, Matthew Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J Subject: UNDER EVALUATION: Producer 17-22 (PTD#2010190) Sustained IA pressure above NOL All, Producer 17-22 (PTD#2010190)was called in during the Flow Station#2 power outage for having inner annulus casing pressure above NOL. On 05/03/18 the well failed a warm TIFL.The failed TIFL indicates a failure in one or more well barriers.The well is now classified as Under Evaluation and is on the 28 day clock for diagnostics and repairs. Plan Forward: 1. Slickline: Change out GLVs 2. DHD:TIFL 3. Well Integrity Engineer:Additional diagnostics as needed Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Office:907-659-8110 r Organization-Alaska SCANNED 1 RECEIVED STATE OF ALASKA OLASKA OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS JAN t 4 2018 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 OpA n 0 Suspend 0 Perforate m Other Stimulate 0 Alter Casing 0 Change pprove ro am 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 201-019 3. Address: P.O.Box 196612 Anchorage, Development I 1 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-23000-00-00 7. Property Designation(Lease Number): ADL 0028333 8. Well Name and Number: PBU 17-22 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 14819 feet Plugs measured feet true vertical 9055 feet Junk measured feet Effective Depth: measured 14725 feet Packer measured 10746 feet true vertical 9053 feet Packer true vertical 8783 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 77 20"91.5#H-40 29-106 29-106 1490 470 Surface 4350 10-3/4"45.5#L-80 28-4377 28-4274 5210 2480 Intermediate 10956 7"26#L-80 26-10982 26-8939 7240 5410 Production Liner 4021 4-1/2"12.6#L-80 10796-14817 8816-9055 8430 7500 Perforation Depth: Measured depth: 10965-14716 feet True vertical depth: 8928-9053 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 24-10802 24-8820 Packers and SSSV(type,measured and 4-1/2"BAKER S-3 PERM PACKER 10746 8783 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED JAN I 2. �l 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 79 1459 2105 1372 334 Subsequent to operation: Not Tested 1325 275 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations a Exploratory 0 Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Iv1 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Richards,Meredyth Contact Name: Richards,Meredyth Authorized Title: Petroleum Engineer /JContact Email: Meredyth.Richards@bp.com Authorized Signature: � 1 Date: I/Y?/ e3� Contact Phone: +1 9075644867 Form 10-404 Revised 04/2017 *if 1/77- 1/ 60110 6BDi pS \A, JAN r 2[18 Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary January 22, 2018 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Addition of Perforations for Well 17-22, PTD # 201-019. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • 41 v CD v- 2 J II O J ELQ O O cd Z O Z rn c UO' O 2 = 2 2 = II o in 0a I- Oa 2 rn Q 0 LU W rn ao Loa_ P LoO 0) V O v a 9 H xCI I.L 1() xIL iO QO N cn U N (n J 2 FL- (0 U tY m 0 J N Qj - < U CQ03 _ m co <-1 wo >- z F F c[ m EE E _ 11 0a QRf QQUj0a 0 r: E a) 2cCQ W � I- n >'d W � Q ~Q � ' W 2 WO -* F- � 0W > I O 5 " WW1oO � OE0 fl 77N as F OZa aa « i W = _ - O Wtiza~ OO7 ° f- a ',-9- 4- D +. 1,t1 J JLJOZ O W WN N DOu. 005 - I U _ > I - . J coo On- J aL- CO U co U W m Q. o ,— _ o ,— UcrLL IIINO) a N re i2 oNII ma O W J O ao lll zo'' > wWrncO , WOOOM il Z a W Lu Z rn i 1117U - o o U - C) - __J cn O II � a °J° WO � a °J° W ill (-h. UH. coi)-- - = in � Q } = v5 � O J ~ EE0_ -4— Ecc -cr0_ U'' in, U W Q = II O w N Q II O O Q _ 00 Z 22 t l Z W J J O a zDQQfX W WDQQWO _JiW * a) ccmOa , ccmOaa < 5 : 0 W F Q a 0 N cof 5 N m U Q TREE= 4-1/16'5MC1W WELU-EAD= 13-5/8"FMC SAI-t1Y NOTES: WELL EXCEEDS 70 DEG @ 11159'AND ACTUATOR= BAKER 17_z 2 GOES HORIZONTAL!? 11287. 4.5'VVLEG SPACED OUT KB.ELEV= 64.8' INTO BAKER ZXP PACKER TEBACK SLEEVE+/-5 FT, BF.ELEV KOP= 1350' Max Angle= 92 @ 13960' I I 2015' —14-12"FES NP,D=3.813" Datum MD= 10868' Datum TVDss= 8800' 10-3/4"CSG,45.5#,L-80 BTC,D=9.950" — 4378' _ _ GAS LFT MANDRELS ST MD TVD DEV TYPE V LV LATCH PORT CitATE 6 3706 3560 17 KBG-2 DOME BK 16 12/06/07 5 5228 5008 34 KBG-2 DOME BK 16 12/06/07 4 6702 6015 50 KBG-2 DOME BK 16 12/06/07 4-1/2"BKR 45 WL'KB"PATCH(11/26/07), H 9515'-9550' 3 8226 7033 47 KBG-2 SO BK 20 12/06/07 D=2.45" '2 9528 7903 49 KBG-2 *DM1' BK 0 08/21/06 8 ' 1 10522 8571 48 KBG-2 DMY BK 0 04/28/01 'GLM#2 IS COVERE)BY PATCH i ' 10725' 7141/7 HES'X'NP,D=3.813" Minimum ID = 1313" @ 10779' 2-7/8" 'X' NIPPLE X 10745' —7"X 4-1/2"BKR'S-3'PKR,F)=3.875' 111 10779' 41/2'I ES'X NP,D=3.813' 10779' -2-7/8"NPREDUCER,D=2.313"(11/14/07) 10796' —7'X5"BAKERZXP LM RR 4-1/2"TBG, 12.6#,L-80 BTC-MH 10801' W/TE33ACK,D=3.958" .0152 bpf,D=3.958" 10801' —11 41/2"WLEG,D=4.000' —TEL ELM-NOT LOGO IF-- 10867' —20'JOINT WYE'RA TAG 7"CSG,26#,L-80 BTC-M,D=6276" —1 10982' —A R , PERFORATION SLWARY REF LOG:SPERRY-SUN EVVR/GR ON 4/12/01 ANGLE AT TOP PERF:49 @ 10965 Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE ` 12706' -120'JOM WITH RA TAG 2-1/8" 6 10965- 10974 0 12/23/17 ` 2-1/8" 6 10794- 10985 0 12/23/17 2-3/4" 4 11225- 11380 0 04/19/01 H 2-3/4' 4 11463- 11710 0 04/19/01 71 14725' PBTD 2-3/4" 4 11856- 12024 0 04/19/01 2-3/4" 4 12295- 12330 0 04/19/01 2-3/4" 4 12870- 13190 0 04/19/01 x- 2-3/4" 4 13240-13260 0 04/19/01 2-3/4" 4 13328- 13560 0 04/19/01 2-3/4" 4 13605- 13700 0 04/19/01 2-3/4" 4 13860- 14010 0 04/19/01 2-3/4" 4 14058- 14716 0 04/19/01 4-1/2"L1NF2, 12.6#,L-80 BTC-M,.0152 bpi,D=3.958" —1 14817' DATE REV BY COMMENTS , DATE REV BY COMMI3NTS FRIDHOEBAY ENT 04/29/01 CWTP SIDETRACK 11/27/07 JKLYPJC BKR PATCH SET @ 9515' WELL: DS 17-22 08/14/06 RCT/PJC GLV GO ; 12/14/07 TEL/PJC GLV C/O PERMIT No:I' 010190 08/21/06 JCMPAG GLV C/O 12/27/17 MS/JIVU ACFERFS(1223/17) API No: 50-029-23000-00 02/09/07 JGM'PAG SET PX TTP to 10779' SEC.22,TION,R15E,2246'FSL 8 1097'FW. 11/19/07 SEWSV PULL PX TTP(11/14/07) ' 11/19/07 SEMSV SET NP.fes.(11/14/07) BP Exploration(Alaska) Ima.~ °roject Well History File Cover('--~ge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. _~OL- 0j_(~j~ Well History Fileldentifier RESCAN DIGITAL DATA OVERSIZED (Scannable) / Color items: / Diskettes, No./ - Maps: D Grayscale items: [] Other, No/Type [] Other items scannable by large scanner [3 Poor Quality Originals: OVERSIZED (Non-Scannable) [] Other: NOTES: D Logs of various kinds D Other Project Proofing BY: BEVERLY ROBIN VINCENT SHERYL~)WINDY Scanning Preparation .'"~ X 30 = (~D + '-' / BY: BEVERLY ROBIN VINCENT SHERYL~WINDY Production Scanning Stage I BY: Stage 2 BY: PAGE COUNT FROM SCANNED FILE: .. / O~ PAGE COUNT MATCHES NUMBER iN SCANNING PREPARATION: ."~_ YES /- IF NO IN STAGE 1 ~ PAGE(S) DISCREPANCIES WERE FOUND: ................. YES NO NO (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES ) RESCANNEDBY: BEVERL, Y ROBIN VINCENT SHERYI. MARIA WINDY DATE: fsi General Notes or Comments about this file: Quality Checked 12/10/02Rev3NOTScannedwpd Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2836 ATTN: Beth Well Job # N0.5514 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD Z-30A P-16 03.01 P2-22 U-03 AWJI-00077 AYS4-00122 B9RH-00024 BBUO-00007 BBKA-00021 MEMORY GLS - PRODUCTION PROFILE _ C X-FLOW CHECK/IBP/CEMENT D MP - USIT - ~ X-FLOW CHECK/P 03/06/10 03/08!10 04/21/10 03/08/10 1 / 1 1 1 1 1 1 03-37 S-111 BBKA-00023 85JN-00049 UG/C MENT G/ - L STATIC PRESSURE SURVEY ~ ~) INJECTON 04/22M0 04/24/10 1 1 1 1 R-28 R-04 BCZ2-00009 BCZ2 00010 PROFILE I PRODUCTION PROFILE - t 04/19/10 04/26/10 1 1 1 1 13-23A S-O6 Z-31 17-22 14-07 - BBSK-00016 BBKA-00026 6350-00060 AWJI-00085 AVYO-00068 PRODUCTION PROFILE - WJECTION PROFILE - INJECTION PROFILE INJECTION PROFILE MEM PRODUCTION PROFILE -~ -- PR 04/27/10 04/29/10 04/30/10 04/27/10 04/28/10 1 1 1 1 1 1 1 1 1 1 04-29AL1 A-06 A-28 17-09A BBSK-00017 BBKA-00006 AYTO-00037 10AKA0128 ODUCTION PROFILE - USIT ~ RST - RST - OH MWD/L D EDIT 04/26/10 04/30/10 02/09/10 02/16/10 02/11/10 1 1 1 2 1 1 1 1 1 1 17-09APB7 t0AKA0128 OH MWD/LWD EDIT ~ 0210"7/10 2 1 PLEASE ACKNOWLEDGE REC EIPT BY SIGNIN G eun wort twutur_ nuc r•nwv c.~., r.,. fiN Exploration (Alaska) Inc. Petrotechnical Data Center LR2-i 900 E. Benson Blvd. Alaska Data 8 Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2638 os/mn o 1I 11 u >t ~~~j~r ~f ~ .,;~ e~ ~.~~Y ~. ~~~~ 211(} .~~ t~ ,~~ STATE OF ALASKA !-9l/d ALA~A OIL AND GAS CONSERVATION COM~SION REPORT OF SUNDRY WELL OPERATIONS ~~~ ~ g ~~,~, 1. Operations Abandon ~ Repair Well Q Plug Perforations ~ Stimulate ~ Other ~ TUBING PATCH Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver Ti~t~r~i~~~~ ~[9f=~, ~QrTtffi195Si0fr Change Approved Program ~ Operat. Shutdown Perforate ~ Re-enter Suspended Well ~?'~t~i" 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ~ Exploratory ' 201-0190 ' 3. Address: P.O. Box 196612 StratlgraphlC Service 6. API Number: Anchorage, AK 99519-6612 50-029-23000-00-00~ 7. KB Elevation (ft): 9. Well Name and Number: 64.8 KB PBU 17-22 8. Property Designation: 10. Field/Pool(s): _ ADLO-028333. PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 14819 ' feet Plugs (measured) None true vertical 9055.13 ' feet Junk (measured) None Effective Depth measured 14725 feet ;~ , ~~~ JAN ~ ~ 2~~~ true vertical 9053 feet Casing Length Size MD TVD Burst Collapse Conductor 77 20" 94# H-40 29 - 106 29 - 106 1530 520 Production 10957 7" 26# L-80 25 - 10982 25 - 8939 7240 5410 Surface 4350 10-3/4" 45.5# L-80 28 - 4378 28 - 4275 5210 2480 Liner 27 5" 15# L-80 10796 - 10823 8817 - 8834 8290 7250 Liner 3994 4-1/2" 12.6# L-80 10823 - 14817 8834 - 9055 8430 7500 Perforation depth: Measured depth: 11225 - 11380 11463 - 11710 11856 - 12024 12295 - 12330 12870 - 13190 13240-13260 13328-13560 13605-13700 13860-14010 14058-14716 True Vertical depth: 9034.63 - 9035.7 9034.84 - 9040.5 9043.69 - 9044.49 9052.79 - 9052.8 9048.78 - 9045.7 9045 - 9045 9044 - 9049 9050 - 9053 9053 - 9050 9048 --9053 Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 23 - 10801 0 0 - Packers and SSSV (type and measured depth) 4-1/2" Baker S-3 Perm Packer 10745 5" Baker ZXP Top Packer 10796 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment des i ti i l di l d d fi l ~ ~' ~~~ ~ ~ ~d~~ cr p ons nc ng vo u umes use an na pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SHUT-IN Subsequent to operation: SHUT-IN 14. Attachments: 15. Well Class after proposed work' Copies of Logs and Surveys Run Exploratory ~' Development ~ Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil Gas ~ WAG ~ GINJ ~ WINJ ~' WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 ~` Date 12/28/2007 ` r. w 17-22 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ~CTIVITYDATE ~ SUMMARY ~ 11/25/2007 WELL S/I ON ARRIVAL. T/I/O = 290/250/0 RIH WITH 4.5" BAKER SINGLE TRIP TUBING PATCH. OVERALL TOOL LENGTH 52.5', MAX OD = 3.70". PULL INTO POSITION TO SET PATCH. IGNITOR DID NOT FIRE. APPEARS TO BE A SHORT. POOH. CHECKED 'IGNITOR AT SURFACE IN FIRING HEAD. SHOWING IGNITOR SHORTED ';TO FIRING HEAD. CHECKED CCL AND TEST FIRE AT SURFACE STILL ', ''GOOD. IGNITOR CHECKED GOOD OUT OF FIRING HEAD. REPLACED IGNITOR. CHECKED GOOD AT SURFACE. RIH WITH PATCH AGAIN. '"""CONTINUED ON 26-NOV-2007*** JOB INCOMPLETE. 11/26/2007 "`*CONTINUED FROM 25-NOV-200T`** 'WELL S/I ON ARRIVAL. T/I/O = 290/250/0 !RIH WITH 4.5" BAKER SINGLE TRIP TUBING PATCH. OVERALL TOOL LENGTH 52.5', MAX OD = 3.70". PULL INTO POSITION TO SET PATCH. .IGNITOR DID NOT FIRE. APPEARS TO BE A SHORT. POOH. CHECKED '.IGNITOR AT SURFACE IN FIRING HEAD. SHOWING IGNITOR SHORTED 'TO FIRING HEAD. CHECKED CCL AND TEST FIRE AT SURFACE STILL GOOD. IGNITOR CHECKED GOOD OUT OF FIRING HEAD. REPLACED 'IGNITOR. CHECKED GOOD AT SURFACE. RIH WITH PATCH AGAIN. 'PATCH SET FROM 9515'-9550'. GOOD INDICATION OF SETTING. _ !WELL LEFT SHUT-IN. FINAL T/I/O: 220/260/0. ... - __ _ _ _._ m .. 11/27/2007T/I/O=SSV/230/10. Temp-SI. IA FL, pre-MITIA (restore tubing integrity). A/L :.disconnected. IA FL @ surface. 11/29/2007 T/I/O = 150/260/20 1VlIT IA to 3000 psi PASSED. (Restore tubing integrity) :Pumped 3.3 bbls of crude into the IA to reach test pressure. MIT IA lost 80 psi in the 1st 15 min and 20 psi in the 2nd 15 min for a total loss of 100 psi in the 30 min test. Bled IAP back down. Final WHP's = 200/0/0 Annulus valves tagged and open to the gauges at the time of de ... _ _ _.. FLUIDS PUMPED BBLS 2 Diesel 2 Total e Jo og escrlptlon ae o or L5-23 11733320 PRODUCTION PROFILE 04/30/07 1 W-38A 11660532 MEM PROD PROFILE 05/02/07 1 Z-38 11660534 MEM PROD PROFILE 05/05/07 1 17-22 11745213 LDL 04/29/07 1 W-19A 11628772 MEM PROD PROFILE 05/07/07 1 Y-24 11630477 LDL 05/08/07 1 16-08A 11686747 LDL OS/20/07 1 G-05 11773110 LDL 05/13/07 1 16-03 11686743 LDL 05/11/07 1 14-07 11637334 PRODUCTION PROFILE 05/08/07 1 V-03 11628770 MEM LDL 04/30/07 1 MPF·91 11628759 MEM TEMP SURVEY 03/09/07 1 MPF-89 11628758 MEM TEMP SURVEY 03/08/07 1 MPS-10A 11638630 INJECTION PROFILE 05/07/07 1 B-34 11594500 INJECTION PROFILE OS/22/07 1 04-10 11594498 LDL 05/19/07 1 B-07 11657125 PRODUCTION PROFILE 05/11/07 1 H-24 11745216 PPROF/GLS 05/02/07 1 04-24 11773112 PRODUCTION LOG 05/19/07 1 C-28A N/A LDL 05/09/07 1 M-07 11630476 LDL 05/07/07 1 P1-14 11745214 INJECTION PROFILE 04/30/07 1 P1-16 11594494 INJECTION PROFILE 05/01/07 1 Scblumberger 1 Z007 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN; Beth c()\nmi$§ic!1 go l - cta, WI! L D b# PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc·C.f"'lit..U.U:n JUN Q 1 2007 Petrotechnical Data Center LR2-1 ",'iIM'U......, ~ 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: 06/07/07 NO. 4290 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay D t CI CD BL . . Alaska Data & Consulting Services 2525 Gambe" Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ß-- Received by: ~ ---- 'ðl? e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _Inserts\Microfilm _ Marker.doc ~ ~ STATE OF ALASKA ALASKA Oil AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIO~CE'VED 1. Operations Performed: Stimulate I!] Ot~r!n 2 3 2004 Abandon 0 Repair Well 0 PluQ PerforationsD Alter CasingD Pull TubingD Perforate New PoolD WaiverD Time ExtenSi?i~€'" C C mmissior Change Approved Program D Operation ShutdownD Perforate D &.1 ~ W,I ;Jas ons. 0 Re-enter Sus ~§ ~ el lnr.hl me ora 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Œ] ExploratoryD 201-0190 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 Stratigraphic D ServiceD 5~29-23000~~ 7. KB Elevation (ft): 9. Well Name and Number: 64.80 17-22 8. Property Designation: 10. Field/Pool(s): ADL-o028333 Prudhoe Bay Field / Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 14819 feet true vertical 9055.1 feet Plugs (measured) None Effective Depth measured 14725 feet Junk (measured) None true vertical 9053.1 feet Casing Length Size MD TVD Burst Collapse Conductor 77 20" 94# H-40 29 - 106 29.0 - 106.0 1530 520 Liner 27 5" 15# L-80 10796 - 10823 8816.5 - 8834.3 8290 7250 LIner 3994 4-1/2" 12.6# L-80 10823 - 14817 8834.3 - 9055.1 8430 7500 Production 10957 7" 26# L-80 25 - 10982 25.0 - 8938.6 7240 5410 Surface 4350 10-3/4" 45.5# L-80 28 - 4378 28.0 - 4274.5 5210 2480 Perforation depth: Measured depth: 11225 - 11380, 11463 -11710, 11856 - 12024, 12295 - 12330, 12870 -13190, 13240 - 13260, 13328 -13560 13605 -13700,13860 -14010, 14058 - 14716 True vertical depth: 9034.63 - 9035.7,9034.84 - 9040.5,9043.69 - 9044.49,9052.79 - 9052.8,9048.78 - 9045.7,9044.99 - 9044.74 9044.06 - 9049.26,9050.39 - 9052.65,9053.48 - 9049.91,9048.18 - 9052.94 Tubing ( size. grade. and measured depth): 4-1/2" 12.6# L-80 @ 23 - 10801 Packers & SSSV (type & measured depth): 4-1/2" Baker S-3 Perm Packer @ 10745 5" Baker ZXP Liner Top Packer @ 10796 12. Stimulation or cement squeeze summary: Intervals treated (measured): 11225 -14716 Treatment descriptions including volumes used and final pressure: 58 Bbls 12% DAD Acid @ 127 psig 13 Representative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Me! Water-Bbl Casing Pressure Tubina Pressure Prior to well operation: 341 1.6 1396 374 240 Subsequent to operation: 311 1.6 1295 0 257 14. Attachments: 15. Well Class after proposed work: Exploratory 0 Development ŒI ServiceD Copies of Logs and Surveys run - 16. Well Status after proposed work: Daily Report of Well Operations - ! OilŒ] GasD WAGD GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISUndry Number or N/A if C.O. Exempt: Contact Garry Catron N/A Printed Name Garry Catron Title Production Technical Assistant Signature Mr... .... {'\~ Phone 564-4657 Date 9/21/04 I - Form 1 0-404 Revised 4/2004 OP1~1t\JAL. 7tf.'¡ b . ~E\? 2 7 lûü~ ~ ~ 17-22 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 06/22/04 MIRU CTU #5. LOAD IA WI CRUDE. RIH WI 2.3" JSN. LOAD WELL WI 225 BBL FILTERED 2% KCL CAP BACKSIDE WI 90 BBLS CRUDE. JET PERFS WI KCL TAG PBTD @ 14723' (CTM-UP). CONTINUED ON 06/23/04 WSR. 06/23/04 CONTINUED FROM 06/22/04 WSR. COMPLETE JETTING PERFS WI FILTERED KCL LAY IN 58 BBLS OF 12% DAD ACID ACROSS PERFS @ 1 :1. SOAK ACID FOR 30 MIN'S. DISPLACE WI FILTERED 2% KCL @ MAX COIL PRESSURE. POOH, PUMPING MIN RATE DOWN CT. RDMO. WELL IS READY TO POP. . **NOTE: PRE-INJECTIVITY = 40 WHP/1830 CTPI 1.6 BPM DOWN CT. POST-INJECTIVITY= 135 WHP/3050 CTP/2.1 BPM DOWN CT** BBLS 263 2% KCL 233 Crude 58 12% DAD Acid 554 TOTAL FLUIDS PUMPED Page 1 Permitto Drill 2010190 MD 14819 j -I-VD DATA SUBMITTAL COMPLIANCE REPORT 4/18~2003 Well Name/No. PRUDHOE BAY UNIT 17-22 Operator BP EXPLORATION (ALASKA) INC 9055 f Completion Dat 4/2112001 '"'"' Completion Statu 1-OIL Current Status 1-OIL ~/,'~4.. / 3 ~"~ APl No. 50-029-23000-00-00 UIC N ~ REQUIRED INFORMATION Mud Log N._9o Sample No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type I~edia Fmt ~ D ~ Ver LIS Verification i Rp~ Ver LIS Verification ,~o~ Pre Pressure "L-e, Te Temperature ~ Cn See Notes (data taken from Logs Portion of Master Well Data Maint) Log Log Run Name Scale Media No Interval Start Stop ~Survey FINAL OH I Dataset CH Received Number Comments __ Open 5/1/2001 MWD Survey, Digital Data Directional Survey FINAL C..-r~'~S u rvey FINAL Directional Survey FINAL ~Survey FINAL Directional Survey FINAL 5 Blu 5 Blu 125 14757 125 14757 10550 11070 125 14819 OH 5/1/2001 Directional Survey, Paper Copy OH 5/1/2001 Gyro Survey, Digital Data OH 5/1/2001 Directional Survey OH 5/1/2001 IIFR Survey, Digital Data OH 5/1/2001 Directional Survey, Paper Copy Open 8/23/2002 ~0~77 Open 812312002 Case 8/16/2002 S/.ta~ey PSP Case 8/16/2002 Static Survey PSP Case 2/13/2003 ~ DigitaIWell Logging Data Well Cores/Samples Information: Name Start Interval Stop Sent Received Dataset Number Comments ADDITIONAL INFORMATION Well Cored? Y / Chips Received? . ',' / Analysis R P.r~.ivP. d ? Daily History Received? ~/N Formation Tops ~/N Permit to Drill 2010190 MD 14819 Comments: TVD DATA SUBMITTAL COMPLIANCE REPORT 4/'18~2003 Well Name/No. PRUDHOE BAY UNIT 17-22 Operator BP EXPLORATION (ALASKA) INC 9055 Completion Dat 4/21/2001 Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-23000-00-00 UIC N Compliance Reviewed By: Date: To' RE' WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 MWD Formation Evaluation Logs · 17-22, February 12, 2003 AK-MM-10084 17-22: Digital Log Images 50-029-23000-00 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2- 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: RECEIVED FEB 1 3 2003 ~l~a 0/1 & Gas Cons. ~rm~J~i~n WELL LOG TRANSMITTAL To: State of Alaska August 15, 2002 Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7m Avenue, Suite 100 Anchorage, Alaska RE: MWD Formation Evaluation Logs 17-22, AK-MM- 10084 1 LDWG formatted Disc with verification listing. API#: 50-029-23000-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING. AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO TIlE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: 08/15~02 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-57ii ATTN: Beth NO. 2319 Company: State of Alaska Alaska Oil & Gas Cons Corem At'tn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job # Log Description Date Blueline Sepia Prints CD PSI-09 ~-,/~-~ ~ BASE TEMP/JEWELRY LOG 07129/02 1 P-23 j c~ ~).-I~ ~, LEAK DETECTION LOG 08102102 1 K-07C I~-- IO(~ STATIC SURVEY 08103102 1 D.S. 17-22~Ol- O/~ STATIC SURVEY 08104/02 1 GNI-03 lCl?..i ~ SHUT-IN TEMP SURVEY 07/2e102 1 D-2SALI i c~ 7" O/c~ STATIC SURVEY 08103/02 K-03A ~ ~ C~_ OO ~) STATIC SURVEY 0Sl02102 K-12A ~,~OO-c-~O-'l STATIC SURVEY 0Sl04102 K-09B I (~.~...~)~r~ STATIC PRESS SURVEY 08105/02 1 PSI-09~O~- JC~ SBHP LOG 07130102 i BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: RECEIVED AUG 1 6 2002 Alaska Oi, i & Gas Cons. Commission Anchorage Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A'I-rN: Beth Receiv~ ~1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG RECEIVED JUN 0 6 Gas Cons. Commission 1. Status of Well Classification of Service W~ [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 201-019 3. Address ~'" 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 i~ · ~.. 50-029-23000-00 4. Location of well at surface .... : ..... i ~rf~.. 9. Unit or Lease Name 2248' NSL, 4184' WEL, SEC. 22, T10N, R15E, UM . '. ' 'i~.H.~:' Prudhoe Bay Unit At top of productive interval 15' NSL, 843' EWL, SEC. 23, T10N, R15E, UM ...,w~r-r¢,;'i.... :. 10. Well Number At total depth ;i ,~--~-~. .......... ~; 17-22 1748' SNL, 4021' EWL, SEC. 26, T10N, R15E, UM .,.,,,... 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Sedal No. 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool KBE = 64.8' ADL 028333 12. Date Spudded 3-13-2001 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'4-11-2001 4-21-2001 115' Water depth' if °fish°re N/A MSL 116' N°' °f c°mpleti°ns One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost 14819 9055 FTI 14725 9053 ETI [] Yes [] NoI (Nipple) 2015' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run DIR, GR, 4PHRES 23. CASING, LINER AND CEMENTING RECORD CASING SE'Fl'lNG DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 106' 30" 260 sx Arctic Set (Approx.) 10-3/4" 45.5# L-80 28' 4378' 13-1/2" 747 sx Arcticset Lite 3, 253 sx Class 'G' 7" 26# L-80 26' 10982' 9-7/8" 285 sx Class 'G' 4-1/2" 12.6# L-80 10796' 14817' 6-1/8" 365 sx Class 'G' 24. Perforations pp. en to. P.roducti.on (M,D+,TVD of Top and 25. TUBING RECORD Bottom and ~merva~, s~ze ana numDer) SIZE DEPTH SET (MD) PACKER SET (MD) 2-1/2" & 2-3/4" Gun Diameter, 4- SPF 2-1/2" & 2-3/4" Gun Diameter, 4- SPF 4-1/2", 12.6#, L-80 10801' 10745' MD TVD MD TVD 11225' - 11380' 9035' -9036' 13240' - 13260' 9045' - 9045' 11463' - 11710' 9035' - 9041' 13328' - 13560' 9044' - 9049' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. 11856' - 12024' 9044' - 9049' 13605' - 13700' 9050' - 9053' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12295' - 12330' 9053' - 9053' 13860' - 14010' 9053' - 9050' 12870' - 13190' 9049' - 9046' 14058' - 14716' 9048' - 9053' 2200' Freeze Protected with 80 bbls.of Diesel 27. PRODUCTION TEST bate First Production Method of Operation (Flowing, gas lift, etc.) May 6, 2001 Gas Lift bate of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL'BBL GAS-MCF WATER'BBL OIL GRAVITY'API (CORR) Press. 24-HOUR RATE '~28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chip~:.. ,,,,. ~., ~., I ~. r ~..., ~...-., ~, , Form 10-407 Rev. 07-01-80 ~ (¢ Submit In Duplicate 29. Marker Name Geologic Markers Measured Depth Sag River Shublik 'A' Shublik 'B' Sadlerochit True Vertical Depth · List of Attachments: 10960' 8924' 10984' 8940' 11024' 8963' 11159' 9021' 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. Summa~ of Daily Drilling Repo~s, Su~eys, Formation Integrity Test I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubb,e ~ Title TechnicalAssistant Date 17-22 201-019 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and teases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval {multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Legal Name: '17-22 Common Name: 17-22 : :: AMW:: :::: I: Surface Pressure Leak Off Pressure (BHP) EMW 3/20/2001 FIT 4,414.0 (ft) 4,290.0 (ft) 9.30 (ppg) 715 (psi) 2,788 (psi) 12.51 (ppg) 4/6/2001 FIT 10,984.0 (ft) 8,942.0 (ft) 8.40 (ppg) 512 (psi) 4,414 (psi) 9.50 (ppg) Printed: 5/1/2001 1:41:55 PM BP EXPLORATION Page I of 12 Operations Summary Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Sub Phase Description of Operations Code 3/11/2001 20:00 - 00:00 4.00 MOB PRE Disconnect all fluid and electrical lines. Prepare to move Camp, pit module and Shop. 3/12/2001 00:00 - 12:00 12.00 MOB PRE Lay Derrick down and move rig from NG1-04 to DS 17. 12:00 - 18:00 6.00 MOB PRE Line up on well. Raise derrick and rig up floor while moving snow on backside of well for diverter line. Install diverter & lines and spot speed head and tree behind cellar at this time due to close well spacing, limiting access after spotting. Lay mats & Herculite. 18:00 - 00:00 6.00 MOB PRE Spot Sub Base pits & camp. Start taking on water in Pits. Hook up all fluid and electrical lines. Change out air boot to 20". RIG ACCEPTED @ 18:00 HRS. 3/13/2001 00:00 - 06:00 6.00 RIGU PRE Continue riggig up to spud. M/U riser and dresser sleeve. Load BHA and 5" DP in shed. Cont. taking on water and spud mud. CIO Top Drive quill to 41/21F 06:00 - 14:30 8.50 RIGU PRE P/U and stand back 40 stands 5" S-135 DP and & 7 stands HWDP. 14:30 - 15:30 1.00 RIGU PRE Clean floor. Hold Spud Meeting w/all personnel 15:30 - 17:00 1.50 RIGU PRE Function test Diverter and Knife valves, test all rig gas alarms. Witnessed by Lou Grimaldi; AOGCC. Hold H2S -Abandonment Drill. 17:00 - 20:30 3.50 RIGU PRE M/U BHA # 1. Adjust Motor to 1.83 deg. Upload MWD. Orient MWD, Motor and UBHO sub. 20:30 - 21:00 0.50 RIGU PRE Fill BHA Test Motor - OK. Test Mud lines to 3000 psi. 21:00 - 00:00 3.00 DRILL SURF Tag at 106'. Drill to 272'. taking Gyro survey every stand. ART 1.5 hrs. NO AST. 3/14/2001 00:00 - 06:30 6.50 DRILL ;SURF Continue drilling 13.5" hole from 272' to 500'. Slide 45' wi 400 gpm @ 565psi. Rot. 183' w/500 gpm @ 850 psi. Gyro surveys every stand down. 06:30 - 07:00 0.50 DRILL SURF CBU / Clean Hole 07:00 - 10:00 3.00 DRILL SURF POH & P/U 3 NlM flex Drill Collars &Jars. RIH 10:00 - 10:30 0.50 DRILL SURF Gyro survey & Orient Motor. 10:30 - 00:00 13.50 DRILL SURF Drill 13.5" Directional hole from 500' to 1272' .Sliding w/425 gpm and rotating w/525 gpm & 40 rpm. with 15K to 35K on bit. AST = 6 Hrs. ART = 10.25 Hrs 3/15/2001 00:00 - 00:00 24.00 DRILL SURF Drill 13.5" Directional hole from 1272' to 2639'. Drilling w/500 - 525 GPM, 30K to 35K on Bit, 40 RPM. 4k-6k ftlb torque on bottom torque & smooth connections indicate good clean hole. P/U 130K, S/O 121K, RotWt 125k. ART = 8.25 Hrs. AST = 9 Hrs 3/16/2001 00:00 - 03:00 3.00 DRILL SURF Drill 13.5" Directional hole from 2639' to 2863'. Drilling w/500-550 GPM, 30K-35K WOB, 4K-8K ftlb torque, P/U 125, S/O 117, Rot Wt 122. ART = 1 HR, AST = 0.5 Hr. 03:00 - 04:00 1.00 DRILL MAIN SURF Lost power to Sperry Sun Trailer. Circ & reciprocate while identifying and correcting problem within trailer. 04:00 - 15:00 11.00 DRILL SURF Continue drilling 13.5" Directional Hole to 3547' ROP steadily dropping. Drilling w/575 GPM, 15 to 35K WOB, 5K to 7K torque. P/U 136K, S/O 129K, Rot Wt. 134K. ART = 7.25 Hrs. AST - 3.75 Hrs. 15:00 - 16:30 1.50 DRILL SURF Circulate Hole Clean. 16:30 - 20:00 3.50 DRILL SURF POH to MWD. 20:00 - 22:00 2.00 DRILL SURF L/D Bit #1 & P/U Bit # 2. Change Motor to 1.5 Degree. 22:00 - 00:00 2.00 DRILL SURF RIH w/HWDP & shallow test MWD. Cont. RIH 3/17/2001 00:00 - 01:00 1.00 DRILL SURF Wash down from 3387' to 3547' 01:00 - 16:00 15.00 DRILL SURF Drill 13.5" Directional hole from 3547' to 4394'. Drilling w/550 -575 Printed: 5/1/2001 10:30:02 AM BP EXPLORATION Page 2 of 12 Operations Summary Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Sub Date From -To Hours Task Code Phase Description of Operations 3/17/2001 01:00 - 16:00 15.00 DRILL SURF GPM, 16K to 38K WOB, 6K to 9K Torque, P/U 150K, S/O 142K, ROT WT 147K ART = 8.75 Hrs. AST = 2.25 Hrs. Note: Top of SV1 sand @ 4249' MD/4150' TVD. 16:00 - 17:30 1.50 DRILL SURF Circulate Hole Clean: 575 GPM @ 1900 psi. 17:30 - 22:00 4.50 DRILL SURF Wiper - POH Tight @ 3800'-3650', 2190' - 1800' RIH Tight 1850' - 2200', 4000'- 4200' worked through, cleaned up. Circ dn.4364' to 4394' - No Fill 22:00 - 23:30 1.50 DRILL SURF Circulate 40 bbl. Hi-Vis Barofiber Sweep. Hole Clean. 23:30 - 00:00 0.50 DRILL SURF Observe well. Pump Dry Job. 3/18/2001 00:00 - 03:30 3.50 DRILL SURF POH 15K Max. Drag. Hole clean. 03:30 - 06:00 2.50 DRILL SURF LID BHA 06:00 - 07:00 1.00 DRILL SURF Clean rig floor, L/D BHA tools. 07:00 - 07:30 0.50 DRILL SURF Make Dummy run w/Casing Hanger & landing jt. 07:30 - 09:30 2.00 DRILL SURF R/U casing tools, Franks fill up tool and CIO bales. 09:30 - 10:00 0.50 DRILL SURF Hold PJSM on running casing. 10:00 - 18:00 8.00 DRILL SURF Run 105 Jts, 10 3/4", 45.5 ppf., L-80, BTC casing as per program. Encountered obstruction/tight hole @ 3547' - wash down to 3600' w/6 BBM at 525 PSI. Land casing. Final P/U wt. 250K, S/O 170K. Shoe @ 4378', F/C 64291', Tam Collar @ 1018'. Centralizers as per program. 18:00 - 18:30 0.50 DRILL SURF L/D Franks tool. R/U SOS Cement Head. 18:30 - 21:00 2.50 DRILL SURF Circulate and Condition Mud for Cement Job. Staged up to 10 BPM. w/ 610 PSI. Reciprocating pipe throughout. Held PJSM w/rig crew, cementers, mud hands and Peak drivers. 21:00 - 00:00 3.00 DRILL SURF Cement as per program. Test lines to 3500 psi. Drop bottom plug. pump 75 bbls.10.2 ppg. MudPush spacer. - 610 bbls.10.7 ppg. IArcticSet # Lite Lead Slurry, followed by 53 bbls 15.8 ppg Class G tail Slurry. Drop top plug and chase w/10 bbls water from cement unit. Switch to rig pumps and continue displacement. Reciprocated Csg. until 400 bbls lead pumped - Hole stickey - landed Hgr. Lost approximately 13 bbls returns while pumpig lead. Otherwise, full returns throughout job. 3/19/2001 00:00 - 01:00 1.00 CEMT SURF Displace cement with rig pumps. Pumped 404 bbls. mud @ 6 BPM slowing to 3 BPM last 3 bbls. Bumped plug w/3500 psi. Floats - OK. 45 bbls contaminated cement and 185 bbls good cement to surface. Full returns throughout displacement. 01:00 - 02:30 1.50 CEMT SURF Flush and drain flow line, riser and Hydril. RID cement head and landing joint. 03:00 - 06:00 3.00 BOPSUF~ SURF N/D Diverter Line and valves, Riser and Hydril. 06:00 - 07:00 1.00 WHSUR SURF M/U FMC 13 5~8" 5M split speed head, test Metal to metal seal to 1100 ~si/10 minutes. 07:00 - 08:00 1.00 CASE SURF RID and LID Casing equip., CIO 16' bales. 08:00 - 12:00 4.00 BOPSUI~ SURF N/U 13 5/8" 5000 psi BOP & Riser 12:00 - 16:00 4.00 BOPSUR SURF Test BOPE 250 / 3500 psi - APl. Witness of test waived by John Crisp, AOGCC. 16:00 - 17:00 1.00 BOPSUR SURF RID test equip. Install Wear Bushing. 17:00 - 21:00 4.00 DRILL SURF RIH w/7 stands HWDP & P/U 108 Jts 5" DP from shed. 21:00 - 00:00 3.00 DRILL SURF POH and stand back DP and HWDP 3/20/2001 00:00 - 01:00 1.00 DRILL INT1 Finish POOH with 5" drill pipe. 01:00 - 04:00 3.00 DRILL INT1 M/U 9 7/8" Steerable Drilling assembly with MWD/PWD. 04:00 - 04:30 0.50 DRILL INT1 Held PJSM with Rig Crew on P/U Drill Pipe operations. 04:30 - 09:30 5.00 DRILL INT1 TIH with 9 7/8" Steerable Drilling assembly ( P/U 96 Jts of 5" DP ) to 4196'. Fill-up drill pipe & break circulation. Printed: 5/1/2001 10:30:02 AM BP EXPLORATION Page 3 of 12 Operations Summa Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Sub Date From - To Hours Task Code Phase Description of Operations 3/20/2001 09:30 - 10:30 1.00 DRILL INT1 Test 10 3/4" casing to 3500 psi for 30 minutes. Test was APl. 10:30 - 11:00 0.50 DRILL INT1 Service Rig. 11:00 - 13:30 2.50 DRILL INT1 Wash down to 4284'. Tag-up on cement. Drill out cement, 10 3/4" Shoe Track from 4284' to 4378'. Clean out 13.5" Rat Hole to 4394' and drill 20' of new formation to 4414'. 13:30 - 14:30 1.00 DRILL INT1 Displace hole to 9.3 ppg LSND WBM. Perform FIT. Pressure up on formation to 715 psi for a EMW of 12.5 ppg. 14:30 - 15:00 0.50 DRILL INT1 Take SCR and PWD base line test at 10 3/4" casing shoe before drilling ahead. 15:00 - 00:00 9.00 DRILL INT1 Drill 9 7/8" Directional hole from 4414' to 5044'. WOB 5-30K, RPM 60 + MM w/5-6K Torque, GPM = 550 w/1980 psi. P/U 157K, S/O 151K, Rot Wt 154K. ART = 4.5 hrs, AST = 2.5 hrs. 3/21/2001 00:00 - 02:00 2.00 DRILL INT1 Drill 9 7/8" Directional hole F/5044' - 5081'. Lost a total of 600 psi while drilling. ( Original on btm pressure at the start of drilling @ 4414' w/9.3# mud was 1900 psi w/550 gpm ). ART = 0, AST = 0.5 02:00 - 07:30 5.50 DRILL PIPE INT1 Pressure test surface equipment to 2600 psi-OK. POOH "Wet" in search of a washout in the Drill String. No washout found. Max drag while POOH = 30k over pull. 07:30 - 08:00 0.50 DRILL PIPE INT1 L/D Bit. Clean Rig Floor. 08:00 - 12:00 4.00 DRILL PIPE INT1 M/U 9 7/8" PDC Bit. Adjust mud-motor to 1.15 deg bend. Orient and test MWD/Mud-motor. Change out Jars. 12:00 - 15:30 3.50 DRILL PIPE INT1 TIH with BH^ on 5" drill pipe to 4300'. Establish a circulating rate of 332 gpm and record pressure every 10 stands. Average pressure increase per 10 stands was 60 psi. 15:30 - 17:00 1.50 DRILL INT1 PJSM. Slip and cut Drill Line. Service Top-drive. 17:00 - 18:00 1.00 DRILL PIPE INT1 TIH to 5041'. Wash to bottom, no fill. 18:00 - 00:00 6.00 DRILL INT1 Drill 9 7/8" Directional hole from 5081' to 5384'. WOB 9-12K, RPM 80 w/7k Torque, GPM 550. P/U 165K, S/O 150K, Rot Wt 157K.. ART = 1 hrs, AST = 3hrs. 3/22/2001 00:00 - 00:00 24.00 DRILL INT1 Drill 9 7/8" Directional hole from 5384' to 6954'. WOB 10-20K, RPM 90 w/7-9k Torque, GPM 580 w/1660 PSI. P/U 180K, S/O 150K, Rot Wt 165K. ART = 12.5 hrs. AST = 5 hrs. 3/23/2001 00:00 - 13:00 13.00 DRILL INT1 Drill 9 7/8" Directional hole from 6954' to 7864'. WOB 10K, RPM 90 w/ 9-11K Torque, GPM 575 w/1750 psi. P/U 190K, S/O 170K, Rot Wt 183K. ART = 6.5hrs. AST = 2.5 hrs. !13:00 - 14:00 1.00 DRILL INT1 Pump Hi-vis sweep and circulate hole clean. 14:00 - 17:00 3.00 DRILL INT1 POOH for wiper trip to 10 3/4" casing shoe @ 4378'. Encountered tight spots @ 7108', 6885' 6513', 6355', 5979', 5477', 5226', 5039', 4852'. Max overpull 110k at 5226'. Work pipe through tight spots with no 3roblems. 17:00 - 17:30 0.50 DRILL INT1 Service Top-Drive. Fill Drill Pipe. 17:30 - 19:30 2.00 DRILL INT1 TIH to 7765' with no hole problems encountered. Fill Drill Pipe @ 6238'. 19:30 - 20:30 1.00 DRILL INT1 Establish circulation. Wash and ream to bottom @ 7864'. CBU. ECD 11 ppg with lots of cutting coming over the shakers. Initial circulating rate 575 gpm. Reduce rate to 400 gpm half way through bottoms-up due to large amount of cutting and shaker screens blinding off. 20:30 - 00:00 3.50 DRILL INT1 Drill 9 7/8" Directional hole from 7864' to 8052'. WOB 10K, RPM 90 w/10-12k Torque, GPM 575 w/1750 psi. P/U 190K, S/O 175K, Rot Wt 185K. ART = 2.5hrs. ^ST = 0hrs. 3/24/2001 00:00 - 03:30 3.50 DRILL INT1 Drill 9 7/8" Directional hole From 8052' to 8239'. WOB 10K, RPM 90 w/12K Torque, GPM 575 w/1750 psi. P/U 205K, S/O 180K, Rot Wt 190K. ART = 2.5hrs. AST = 0.5hrs. Printed: 5/1/2001 10:30:02 AM i, BP EXPLORATION Page 4 of 12 Operations Summary Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Sub Date From-To Hours Task Code Phase Description of Operations '312412001 03:30 - 04:00 0.50 DRILL MOTR INT1 Had a sudden increase in pressure while backreaming a stand prior to making connection. Pressure went from 1650 psi @ 575 gpm to 3700 , psi @ 300 gpm. Trouble shoot problem. Either the stator rubber chunked out or bearing section failure. 04:00 - 10:30 6.50 DRILL MOTR INT1 POOH with 5" drill pipe. No hole problems encountered while tripping through open hole section. Max drag 30K. 10:30 - 14:00 3.50 DRILL MOTR INT1 PJSM. POOH with BHA. Flush MWD and download same. L/D bit, found that the bearing section on mud-motor had failed. L/D mud-motor. 14:00 - 14:30 0.50 BOPSUF INT1 Pull wear bushing. Run test plug. 14:30 - 16:30 2.00 BOPSUF INT1 Test BOPE and all surface related equipment to 250/3500 psi. All test were APl. Witness of test waived by John Crisp, AOGCC. 16:30 - 17:00 0.50 BOPSUF INT1 Pull test plug. Install wear bushing. 17:00 - 17:30 0.50 DRILL INT1 Clear rig floor. 17:30 - 20:00 2.50 DRILL INT1 P/U BHA #5. M/U rebuilt Hycalog DST0 PDC bit and new 1.15 deg bend mud-motor. Orient MWD/Mud-motor. 20:00 - 21:30 1.50 DRILL INT1 TIH with 9 7/8" steerable drilling assembly on 5" drill pipe to 4378'. 21:30 - 22:00 0.50 DRILL INT1 CBU with 480 gpm @ 750 psi. 22:00 - 00:00 2.00 DRILL INT1 Continue TIH ( 6925' @ Midnight ). 3/25/2001 00:00 - 01:30 1.50 DRILL MOTR INT1 Continue TIH. Tag-up on obstruction @ 8150'. 01:30 - 02:30 1.00 DRILL MOTR INT1 Establish circulation. Wash past tight spot @ 8150' with no problems. Continue wash and ream to bottom @ 8239'. 02:30 - 21:00 18.50 DRILL INT1 Drill 9 7/8" Directional hole from 8239' to 9546'. WOB 10-12K, RPM 80 w/10-12K ftlb Torque, GPM 575 wi 1900 psi. P/U 235K, S/O 180K, Rot Wt 195K. ART = 10.75 hrs., AST = 3.25 hrs. Note: Started weighting up the mud to 10.9 ppg @ 9500'. 21:00 - 22:00 1.00 DRILL 'LOG INT1 Had MWD failure ( no signal ) circulate while Sperry-Sun ran surface diagnostic checks on MWD. 22:00 - 23:00 1.00 DRILL LOG INT1 Circulate and condition mud. Finish wt up mud to 10.9 ppg in and out. 23:00 - 00:00 1.00 DRILL LOG INT1 POOH. Hole tight and swabbing. Pulling 50K-70K over pull from 9486'. Backream from 9360' to 9174'. 3/26/2001 00:00 - 05:30 5.50 DRILL LOG INT1 Continue POOH due to MWD tool failure from 9174' to 8613' with 40K max overpull. Tight @ 8697'. Backream 8697'- 8336'. POOH to 7867' witn no problems. Encountered tight hole 7867'-7681' with 50K-70K overpull. Backream 7681'- 7019'. 05:30 - 07:30 2.00 DRILL LOG INT1 POOH with no pump. Worked through tight hole 7019'-6547' with 40K-60K overpull. Then finish POOH up to 4378' with no other hole problems. 07:30 - 08:00 0.50 DRILL LOG INT1 Flow check well at 10 3/4" casing shoe-OK. Pump slug. 08:00 - 10:30 2.50 DRILL LOG INT1 Finish POOH with 5" DP and HWDP. 10:30 - 12:30 2.00 DRILL LOG INT1 LID jars, MWD, mud-motor and bit. 12:30 - 13:30 1.00 DRILL INT1 Service Top-Drive and check main shaft on Drawworks. 13:30 - 15:30 2.00 DRILL LOG INT1 M/U BHA #6. P/U Fresh mud-motor ( 1.15 deg bend ), MWD/PWD and jars. Up-load MWD tool. 15:30 - 18:00 2.50 DRILL LOG INT1 TIH with BHA on 5" DP to 10 3/4" casing shoe @ 4378'. Fill drill pipe. 18:00 - 19:00 1.00 DRILL INT1 Slip and cut 72' of drill line. Re-set and test C-O-M. Adjust Drawworks brakes. 19:00 - 20:00 1.00 DRILL LOG INT1 Circulate bottoms up at shoe and test MWD tool with 577 gpm @ 1450 psi. 20:00 - 22:30 2.50 DRILL LOG INT1 Continue TIH to 9363' with no problems. Fill 5" DP @ 6500'. 22:30 - 00:00 1.50 DRILL LOG INT1 Establish circulation. Wash from 9363' to 9546' with no problems. Take MWD check shot on each connection. 3/27/2001 00:00 - 23:00 23.00 DRILL INT1 Drill 9 78 drctnl hole from 9546 to 10076, reduced Printed: 5/1/2001 10:30:02 AM BP EXPLORATION Page 5 of 12 Operations Summa Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Date From-To Hours Task Sub Code Phase Description of Operations 312712001 00:00 - 23:00 23.00 DRILL INT1 pump rate until btms up from trip. Cont drill ahead full rate. WOB 10-15, RPM 100, 575 gpm @ 2200 psi. PU 248, SO 180, Rot 206. ART 14.5, AST 3.75, torque on 12-13, off 11-12. Reduced rop to 2 feet per hr, change parameters, no increase rop. 23:00 - 23:30 0.50 DRILL INT1 Circ nut plug sweep, observe well, PJSM 23:30 - 00:00 0.50 DRILL INT1 Prepare and poh, pull clean off btm, pull 15 stds, no swab, to 8711 ft. 3/28/2001 00:00 - 01:30 1.50 DRILL INT1 Cont. poh for bit, 265 up, 168 dn, drag 5 - 25 K, no swab, to 8711 ft., flow check, pump dry job, observe well. 01:30 - 05:30 4.00 DRILL INT1 Cont. poh to bha 05:30 - 07:30 2.00 DRILL INT1 Monitor well at bha, lay dn sngle hwdp, stand bk bha, monitor well at bit, break and inspect bit. ( bit balled up and crown area worn ) 07:30 - 09:00 1.50 DRILL INT1 Download MWD, clear floor, service rig 09:00 - 10:30 1.50 DRILL INT1 Make up new PDC bit, handle bha. observe well. 10:30 - 12:00 1.50 DRILL INT1 Rih 5"dp to shoe at 4378 ft 12:00 - 15:30 3.50 DRILL INT1 Fill pipe, test MWD, cont rih to 7400 ft, fill pipe, break circ. Rih to 9900 ft. Tight ( 15 - 20 K ) at 8800 to 9200 ft. No reaming necessary. 15:30 - 16:30 1.00 DRILL INT1 Wash / ream ( precautionary ), 9900-10076 ft. No fill. 16:30 - 00:00 7.50 DRILL INT1 Resume drill ahead 10076 - 10144 ft. drctnl drlg. ART 3 3/4, AST 1 3/4. up 260, dn 170, rot 210 620 gpm @ 2670 psi, torque 10 - 12 K. 3/29/2001 00:00 - 00:00 24.00 DRILL INT1 Cont drill 9 7/8 hole, drctnl, 10144 - 10442 ft, WOB 5-15, RPM 60, GPM 620, SP 2550, Torque 13 PU 248, SO 183, ROT 210, ART 14.25 hrs, AST 6.25 hrs. 3/30/2001 00:00 - 02:00 2.00 DRILL INT1 Drill 9 7/8 drctnl hole 10442 - 10499. 620 gpm @ 2550 psi, 10-14 WOB, 40 - 60 RPM, Tq dn 13, Tq offbtm 12, Up 248, dn 183, Rot 210. Ast 0, Art 2. Discover rubber components from mud motor at surface, decision poh for inspection. 02:00 - 03:30 1.50 DRILL DIR INT1 Circ out sweep pumped prior to motor failure, observe well. 03:30 - 09:30 6.00 DRILL DIR INT1 Prepare and poh 500 ft, no swab, 5 - 20 drag, pump dry job, observe well, cont poh to shoe at 4300 ft. observe well, poh to bha. 09:30 - 12:00 2.50 DRILL DIR INT1 Monitor well, stand bk hwdp, Lay out jars, Handle bha, Break and inspect bit / motor ( Condition unknown until shop disassembly ). 12:00 - 13:00 1.00 DRILL DIR INT1 Clear floor, drain stack, pull wear bshg. install test plug. 13:00 - 17:00 4.00 DRILL DIR INT1 Proceed test bope, choke, all components, as per BP / ^OGC specs. 250 Iow/3500 high 10 min. Witness test waived Grimaldi ^OGC. 17:00 - 18:00 1.00 DRILL DIR INT1 Clear floor, rig dn test equip, blow dn lines. 18:00 - 18:30 0.50 DRILL DIR INT1 :Service top drive 18:30 - 20:30 2.00 DRILL DIR INT1 Handle bha, make up motor/mwd, set at 1.15 deg, orient and sign off adjustment. Rih remainder bha, observe well. 20:30 - 21:30 1.00 DRILL DIR INT1 Rih 5" dp to 4297. 21:30 - 22:30 1.00 DRILL DIR INT1 Slip and cut 65 ft drlg line Printed: 5/1/2001 10:30:02AM BP EXPLORATION Page 6 of 12 Operations Summa Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 3/30/2001 22:30 - 23:00 0.50 DRILL DIR INT1 Fill dp / test mwd. Observe well 23:00 - 00:00 1.00 DRILL DIR INT1 Cent rih 5" dp to 8485 ft. 3/31/2001 00:00 - 02:30 2.50 DRILL INT1 Cent rih, work tight hole 8282 and 10390 ft. No rot, no pump. 02:30 - 03:00 0.50 DRILL INT1 Precautionary wash 10390 - 10499, no fill, hole good cond. 03:00 - 03:30 0.50 DRILL INT1 Commence drill ahead 9 7/8 hole, 10499 - 10503. WeB 5, Rot 60, 530 gpm @ 2850, Tq up 12, Tq btm 13. 03:30 - 04:00 0.50 DRILL INT1 Reduce gpm ( shakers blinding ), circ off btm. 04:00 - 00:00 20.00 DRILL INT1 Resume drill ahead, 10503 - 10787 ft. Up 255, Dn 183, Rot 211, Art 14.5, Ast 1.75 4/1/2001 00:00 - 05:00 5.00 DRILL INT1 Cont. drill ahead 9 7/8 hole 10787 - 10861. No abnormal conditions. WeB 25-27, RPM 80,600 gpm @ 2800, Tq 10 - 12, Up 265, Dn 189, Rot 219. 05:00 - 06:00 1.00 DRILL INT1 Daylight savings time adjustment 06:00 - 07:00 1.00 DRILL CIRC INT1 Circ with pump #1, repair mud pump #2 07:00 - 16:00 9.00 DRILL INT1 Resume drill ahead 10861 - 10983 TD. 16:00 - 17:00 1.00 DRILL INT1 Circ for samples as per Co Geo. 17:00 - 18:30 1.50 DRILL INT1 Survey, pump sweep, recip pipe. 18:30 - 20:30 2.00 DRILL INT1 Observe well, prepare and poh as wiper trip to 7990 ft. Up 290, dn 185, 25 - 30 drag, no swab. Hole good cond. 20:30 - 22:00 1.50 DRILL INT1 Observe well, rih to 10983 ft. Down drag normal, no fill, cond. good. 22:00 - 00:00 2.00 DRILL INT1 Recip pipe while circ 2nd Hi Vis sweep, shaker clean. 4/2/2001 00:00 - 01:00 1.00 DRILL INT1 Spot 100 bbl, 11 ppg, 5%, Lubetex pill on btm. Follow with wt pill, observe well. 01:00 - 12:30 11.50 DRILL INT1 Commence poh laying dn 5" dp. Up 292, Dn 180. Hole good cond. No abnormalties. 12:30 - 15:00 2.50 DRILL INT1 Observe well, lay dn 5" hwdp / DCs, drctnl assy. 15:00 - 16:30 1.50 DRILL INT1 Change to 7" rams, test to 250 / 3500 psi against test plug. Lay out test equip. 16:30 - 18:30 2.00 DRILL lINT1 Rig up for 7" csg run, MU Franks tool, clear rig floor. 18:30 - 23:30 5.00 DRILL INT1 Assemble / run 7" shoe track to include guide shoe, 2 jts csg, float, thread locked, and float tested, followed with 7" csg to 10 3/4 shoe at 4378 ft. 23:30 - 00:00 0.50 DRILL INT1 Circ 5 bpm, note no losses. Observe well. 4/3/2001 00:00 - 09:30 9.50 CASE INT1 Continue running 7", 26 ppf., L-80, BTC-M Casing. Reduce running speed @ 5200' to 40/50 fpm.to minimize surge pressue. Wash last Jt, ( # 273 ) to bottom. Shoe @ 10983' Float @10899'. 09:30 - 12:30 3.00 CEMT INT1 Circulate 1.5 % Annular volume staging pumps up to 8 BPM @ 725 psi. 12:30 - 13:30 1.00 CEMT INT1 RD Franks tool, PJU Cement Head. 13:30 - 14:00 0.50 CEMT INT1 Cent circ @ 8 BPM 725 psi. 14:00 - 16:00 2.00 CEMT INT1 PJSM w/all hands, Test lines to 3500 psi. Pump 50 bbls 12.0 ppg Mud Push spacer, followed by 65 bbls, 15.8 ppg, Class G Slurry. Max rate of 4 bpm with max pressure of 765 psi. Drop top plug and displace w/Rig pumps. Pumped @ 7 bpm then 3 bpm / 400psi. for last 7 bbls. Bumped plug w/3500 psi - 417 bbls total displacement. Floats OK. 16:00 - 18:00 2.00 CEMT INT1 R/D Cmt Head, blow down all lines Monitor well 18:00 - 00:00 6.00 WHSUR INT1 N/D BOP. Set slips w/105 K over string Wt. ( 280K string wt. ) Cut casing and install Seal ^ssy. N/U BOP. Torque LDS to 450 E/lbs. Test Seals to 4328 psi./15 min. OK. 4/4/2001 00:00 - 02:00 2.00 BOPSUF INT1 C/O top pipe rams to 3.5" X 6" variables. Install flow riser and turnbuckles. 02:00 - 03:30 1.50 BOPSUF INT1 C/O top drive equip and lower safety valve to 4" HT. Printed: 5/1/2001 10:30:02 AM BP EXPLORATION Page 7 of 12 Operations Summary Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Date From-To Hours Task Sub Code Phase Description of Operations 4/4/2001 03:30 - 09:00 5.50 BOPSUR INT1 Test BOPE to 250 psi Iow & 3500 psi high. Witness of test waived by Chuck Sheve, AOGCC. R/U to inject mud and freeze protect annulus while testing. Install Wear Bushing. 09:00 - 12:00 3.00 CASE ~INT1 Bullhead 220 bbls 10.9 ppg. mud down 7"X 10 3/4" annulus staging up to 3 bbm @ 150 psi.Then freeze protect with 126 bbls dead crude pumpig @ 2 bbm @ 1000 psi, with the final pressure of 1400 psi.@ 2 bbm. 12:00 - 19:00 7.00 DRILL INT1 P/U 4500 ft. of 4" DP and stand back in derrick. 19:00 - 00:00 5.00 DRILL INT1 P/U and M/U BHA. Test MWD and LWD tools. 6 1/8 PDC bit with 1.83 Deg. Motor.will not enter casing. 4/5/2001 00:00 - 03:30 3.50 DRILL INT1 Attempt to enter casing w/6 1/8" PDC Bit & 1.83 deg. Motor - NO GO. Made attempts w/Insert bit, straight motor still NO GO. Stopping at 27" RKB:slip aea in wellhead. Attempt w/6" OD bit sub 2.5" long - Tight but worked through. Believe 7" casing to be slightly pinched in by point loading of 4" long emergency slips. 03:30 - 05:00 1.50 DRILL lINT1 Slip & Cut drilling line, Service top drive & Brakes 05:00 - 07:00 2.00 DRILL CLCG lINT1 M/U 6" PDC bit. RIH w/straight assembly and RIH work through tight spot at 27". POH, adjust motor to 1.83 deg. RIH through tight spot. POH stand back BHA. 07:00 - 08:00 1.00 DRILL INT1 Rig up and test 7" Casing to 3500 psi for 30 min. OK 08:00 - 20:30 12.50 DRILL i lNT1 RIH wi 6" PDC Bit w/1.83 deg Motor & BHA. picking up 4" DP from pipe shed. Fill DP every 3000 ft. RIH to 10,676'. 20:30 - 22:30 2.00 DRILL INT1 Wash down & tag cement @ 10,875". Drill Med. hard cement to Float collar @ 10,895'. Drill plugs and hard cement to 10,980". 22:30 - 00:00 1.50 DRILL INT1 Circulate bottoms up @ 250 gpm w/2400 psi. Hold reservoir meeting while circ. 4/6/2001 00:00 - 03:30 3.50 DRILL PROD1 Circ. while PJSM. Pump 10 bbls water, Drop vinyl ball to open PBL tool followed by barofiber spacer and 8.4 ppg QUICKDRILLn Mud to displace casing. When returns clean - shut down pumps & clean possum bellies, troughs & shakers. Drop steel ball & pump down to close PBL. 03:30 - 06:00 2.50 DRILL PROD1 Drill out shoe to 10985'. Flow check well for 10 min. - Static. Slide to build angle 20' to 11,005' ART - 0.5 Hr. AST - 1.5 Hr. 06:00 - 08:00 2.00 DRILL PROD1 Circulate bottoms up. Perform FIT - pressure 512 psi with 8.4 ppg mud. EMW = 9.5 ppg. 08:00 - 00:00 16.00 DRILL PROD1 Directional drill 6" hole from 11,005 to 11,205 building angle. ROT. - 0 to 40. WOB - 3K to 7K. 250 GPM @ 1650 psi. P/U - 194,000. S/O = 160,000. ROT - 177,000 AST = 1.75 Hrs. ART = 9.25 Hrs. 4/7/2001 00:00 - 22:00 22.00 DRILL PROD1 Directional drill 6" hole from 11,205" to 12,168. WOB: 1K to 8K. 266 GPM @ 1880 to 2060 psi. Torque: 5K to 6K. P/U 194K, S/O 150K. ROT 170K Pump Hi - Vis sweeps every 300'. AST = 2.75 Hrs. ART - 10.75 Hrs. 22:00 - 23:30 1.50 DRILL PROD1 Circulate HI - VIS sweep in preparation for Wiper. 23:30 - 00:00 0.50 DRILL PROD1 POH / Wiper trip - 20K Max overpull; Hole in good shape. 4/8/2001 00:00 - 00:30 0.50 DRILL PROD1 Complete POH to 7" Csg. Shoe @ 10,982'. Hole clean - Max. Drag = 20K. 00:30 - 01:00 0.50 DRILL PROD1 Service Top Drive & Crown. 01:00 - 02:00 1.00 DRILL PROD1 RIH from Shoe. Wash last stand down to bottom. Hole Slick. - No Problems. Printed: 5/1/2001 10:30:02AM BP EXPLORATION Page 8 of 12 Operations Summa Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 4/8/2001 02:00 - 00:00 22.00 DRILL PROD1 Directional Drill 6" Hole from 12,168' to 13,320'. WOB = 1K to 7K. 277 GPM @ 2120 psi. Torque = 5K to 6K. P/U - 192K. S/O 146K ROT. - 170K. ART =10.5 Hrs. AST = 3.5 Hrs. 4/9/2001 00:00 - 02:00 2.00 DRILL PROD1 Directional Drill 6" hole from 13320' to 13382'.WOB =3K to 5K. 277GPM @ 2240 psi. P/U 190K S/O 146K ROT 170K. TQ. = 5 to 7K AST .5 Hrs. ART .5 02:00 - 03:30 1.50 DRILL PROD1 Circulate Hi Vis Sweep. 03:30 - 05:30 2.00 DRILL PROD1 POH to shoe. Max 10K Drag. Hole Slick!! 05:30 - 06:00 0.50 DRILL PROD1 Service top drive & crown 06:00 - 07:30 1.50 DRILL PROD1 RIH to 13289' wash last stand to bottom No Fill 07:30 - 08:00 0.50 DRILL PROD1 Pump Hi Vis sweep into Casing 08:00 - 00:00 16.00 DRILL PROD1 Directional Drill 6" Hole from 13382' to 13944' WOB 3 to 7K. 270 GPM @ 2190 psi. P/u 194K S/O 145K ROT 168K. AST .75 Hrs. ART 5.25 Hrs. 4/10/2001 00:00 - 00:00 24.00 DRILL PROD1 Directional Drill 6" Hole from 13,944" to 14,621. WOB: 3K to 10K, 270 GPM @ 2050 psi. P/U 191K S/O 145K ROT 169K ART = 8.5 Hrs. AST = 6.5 Hrs Still in productive Sand with Stringers of Pyrite and Aciderite. 4/11/2001 00:00 - 08:00 8.00 DRILL PROD1 Drill 6" Directional Hole from 14621" to 14819" WOB = 3K to 7K P/U - 192K, S/O 145K, ROT 169K 270 GPM @ 2350 psi. ART=2.5 Hrs. AST= 2.5 Hrs. Geology called TD 08:00 - 09:30 1.50 DRILL PROD1 Circulate Hi Vis sweep. PJSM 09:30 - 12:00 2.50 DRILL PROD1 POH to 7" Casing shoe Max P/U 210K Hole Slick. 12:00 - 13:30 1.50 DRILL PROD1 Service Top Drive, Drawworks & Crown. Clean Floor. 13:30 - 16:00 2.50 DRILL PROD1 RIH to 14,784' Wash to botom @ 14819' No Fill. 16:00 - 19:00 3.00 DRILL PROD1 Circulate around Hi Vis Sweep @ 6.5 BPM 2650 psi. Spot 150 Bbl. Liner Running Pill in O/H. Pump Pill. 19:00 - 00:00 5.00 DRILL PROD1 POH. Stand back 115 Stds. LID 4" DP 4/12/2001 00:00 - 03:30 3.50 DRILL PROD1 Lay Down 135 Jts. 4" DP. 03:30 - 07:00 3.50 DRILL PROD1 LID BHA. Down Load LWD. 07:00 - 08:30 1.50 DRILL PROD1 RID DP tools R/U to run 4.5" Liner. Make 6" guage run through top of casing. 08:30 - 09:00 0.50 CASE PROD1 PJSM for running Liner - Completion Procedure #1 09:00 ~ 16:00 7.00 CASE PROD1 RIH w/4.5", 12.6#, L-80, BTC-MOD Production liner Assembly. ( 91Jts ) 16:00- 17:00 1.00 CASE PROD1 CIO elevators, M/U Hanger, Circulate Liner volume. @ 6 BPM, 360 psi. Liner Wt. = 44K 17:00 - 22:30 5.50 CASE PROD1 Continue RIH w/4.5" Liner on 4" DP to 10, 938'. 22:30 - 23:30 1.00 CASE PROD1 Circulate DP & Liner Volume. M/U Plug dropping/Cement Head on a , single and lay on skate. 23:30 - 00:00 0.50 CASE PROD1 Continue RIH w/4.5" Liner. P/U 180 K, S/O 152K at 7" Shoe. 4/13/2001 00:00 - 04:00 4.00 CASE PROD1 Continue RIH w/4.5" Liner on 4' DP to 14,780'. M/U Plug drop/Cmt Head & wash to bottom - 14,819'. 04:00 - 05:30 1.50 CASE PROD1 Stage pumps up to 7 BBM @ 1880 psi. while reciprocating 15'. Circ 490 bbls. P/U -' 200K S/O = 145K. Held PJSM with all Hands. 05:30 - 08:00 2.50 CEMT PROD1 Pump 5 bbls C/W test lines to 4500 psi. Pump 15 bbls C/W followed by 50 bbls. 10.0 ppg MudPush Spacer. Then pump 86 bbls,15.8 ppg. Class G Cmt. Flush lines w/Perf Pill, drop dart and dislace w/75 Bbl. Perf Pill followed by 35 bbls. Seawater. Slow pumps to observe latch of Printed: 5/1/2001 10:30:02 AM BP EXPLORATION Page9 of 12 Operations Summar Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Sub Date From-To Hours Task Code Phase Description of Operations 4/13/2001 05:30 - 08:00 2.50 CEMT PROD1 Liner Wiper plug and continue displacement w/60 more bbls Seawater. Bump plug and pressure up to 3500 psi to set Hanger. Slack off 50K, bleed to "0" Floats OK. Release running toolw/20 R/H Turns. 08:00 - 09:00 1.00 CASE PROD1 Pressure DIP to 1000 psi P/U & observe Bleed off and loss of 44K wt. Pump 33 bbls@ 10 bbm. shut dn pumps. S/O 50K and R/H rot. @ 20 RPM to Set the ZXP Packer Observed Shear. Circ 490 bbls. seawater Observed approximately 40 bbls cmt contaminated returns. Well clean - shut down pumps. 09:00 - 12:00 3.00 CASE PROD1 POH 50 Stands. P/U & BIO Plug/Cmt Head. 12:00 - 13:00 1.00 CASE PROD1 Slip & cut drilling line, adjust brakes, clean under draworks, service crown. ~13:00 - 16:30 3.50 CASE PROD1 Continue POH. Break Running tool and L/D. Rotating dog sub had sheared. 16:30 - 17:30 1.00 BOPSUF PROD1 Pull Wear Bushing and rig to test BOPE. 17:30 - 20:00 2.50 BOPSUl; PROD1 Test BOPE - APl. 250 / 3500 psi. Witness of BOP test waived by John Spaulding, AOGCC. 20:00 - 20:30 0.50 BOPSUF PROD1 R/D test equip. Install Wear Bushing. 20:30 - 21:00 0.50 BOPSUI; PROD1 Pressure test Casing to 3500 psi for 30 minutes. Hold PJSM on P/U Perf. Guns. w/all hands. 21:00 - 00:00 3.00 CASE PROD1 P/U Perforating guns & RIH 4/14/2001 00:00 - 01:00 1.00 PERF COMP Continue P/U Perf. guns RIH. Total 3491' 01:00 - 03:00 2.00 PERF COMP R/U 2 7/8" PAC handling equip. P/U and RIH w/17 Jts 2 7/8" PAC Tbg. RA marker between Jts 3 & 4. 03:00 - 04:30 1.50 PERF COMP !R/D 2 7/8" equip. P/U & M/U Safety Jt., Champ IV Pkr. and Big John :Jars. RIH 04:30 - 11:00 6.50 PERF COMP RIH w/4" DP. Tag Landing collar @ 14,726' DPM. P/U and space out guns. Bottom shot @ 14716', Top shot @ 11225'. 11:00 - 12:00 1.00 PERF COMP R/U DP safety valve. Set Champ Pkr. & test to 1500 psi. Open By-Pass. 12:00 - 13:00 1.00 PERF COMP Reverse Circ. @ 4BPM - 800 psi. While R/U HES HP Test manifold and Hot Oiler. PJSM 13:00 - 14:00 1.00 PERF COMP Test lines to 4000 psi. Pump 58 bbls. Diesel down DP to create 200 psi underbalance. Close bypass. R/U Shot Recorder. Pressure up to 4000 3si to initiate firing sequence. Bleed DP to 0 psi. Shots fired. Wait 10 min. 70 psi on DP. 14:00 - 16:30 2.50 PERF :COMP Reverse diesel through choke to cuttings tank Continue to rev. circ. complete well volume through Gas Buster. Un seat Champ and observe well- 2 Bbl. loss in 20 minutes ( 6 bph ). Rig to Lay Down Drill Pipe. 16:30 - 00:00 7.50 PERF COMP POH Laying Down 4" Drill Pipe. 4/15/2001 00:00 - 03:30 3.50 PERF COMP POH LID remaining 4" DP and 2 7/8" PAC. 03:30 - 11:00 7.50 PERF COMP PJSM POH w/HES 2.5" Guns. Only top 19 and bottom 10 Guns fired. Peris: 11,2250 - 11,558 and 14,502 - 14,716. 11:00 - 13:00 2.00 PERF PERF COMP Clear floor and hoist BHA equip to floor. Strap BHA and load 2/7/8" PAC DP in Pipe Shed 13:00 - 19:30 6.50 PERF PERF COMP M/U CIO BHA. RIH P/U 2 7/8" PAC DP.M/U 7" Scraper, PBL Sub and Jars. 19:30 - 20:30 1.00 PERF PERF COMP P/U 1 Stand 4' DP. M/U Top Drive and attempt to Circulate. Pressured up - String plugged. Worked pipe & pump atempting to unplug with no success. 20:30 - 00:00 3.50 PERF , PERF COMP P/U 48 Jts 4" DP and POH standing back in derrick in" L" position for safe Racking of 2 7/8" P^C DP. 4/16/2001 00:00 - 05:30 5.50 PERF PERF COMP Continue POH L/D Jars, PBL, 7" Scraper, XO. R/U & stand back 42 Printed: 5/1/2001 10:30:02 AM BP EXPLORATION Page 10 of 12 Operations Summary Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Date From-To Hours Task Sub Code Phase Description of Operations 4/16/2001 00:00 - 05:30 5.50 PERF PERF COMP stands 2 7/8" PAC DP Break down BHA. Scale & Rust plugged up to 5' on 1st Jr. DP. 05:30 - 10:00 4.50 PERF PERF COMP : Drop off Mill & RIH w/4.5" Scraper open ended on 2 7~8" PAC DP. Break ¢irc every 10 Stands. Clean out run cancelled. !Received orders from the BP Drilling department to POOH and run perf guns. 10:00 - 10:30 0.50 PERF PERF COMP Circulate w/95 spin @ 3320 psi. 10:30 - 16:00 5.50 PERF PERF COMP POH Stand back 9 stands 2 7/8" PAC DP L/D 100 Jts. & scraper. 16:00 - 17:00 1.00 PERF PERF COMP Clear & clean Floor. Load Perf. Guns in Pipe Shed. PJSM w/All Hands. 17:00 - 00:00 7.00 PERF PERF COMP RIH w/2.5" OD Perf guns w/4 SPF. as per program. Run 9 stands PAC DP. P/U & run 7" Champ IV Pkr., 16 stands of 4" DP from Derrick. 4/17/2001 00:00 - 10:00 10.00 PERF PERF COMP TIH with HES 2.5" x 4spf Perf Gun assembly. P/U 4" DP to 10,745'. Total ft of perf guns = 1573'. Total overall gun assembly = 2913'. P/U 196k, S/O 165k. 10:00 - 11:00 1.00 PERF PERF COMP PJSM. TIH. Tag up on the 4.5" Liner Top ( inside PBR ) @ 10804' DPM.P/U 52' to place perf guns on depth. R/U & test surface equipment to 3000 psi. 11:00 - 12:00 1.00 PERF PERF COMP Spot 80 bbl of perf pill down 4" DP. Set Champ IV packer. Test 4" x 7" annulus to 1000 psi-OK. Install HES sound recorder on 4" DP. 12:00 - 12:30 0.50 PERF PERF COMP Pressure up on the annulus to 2000 psi. The perfguns fired @ 1580 psi with good sound indication @ surface. Bleed off annulus pressure to 250 psi. Strip up through Hydril to open Champ packer By-Pass. Monitor well. Well static. 12:30 - 13:00 0.50 PERF PERF COMP Open Hydril. P/U another 10'. Perf Guns free. Monitor well for 30 minutes. Well static. No losses, no gain. 13:00 - 21:00 8.00 PERF PERF COMP POOH. LID 4" drill pipe. Observe well at liner top, i¢ont poh to pkr assy. 21:00 - 22:30 1.50 PERF PERF COMP Layout pkr assy, flow check, clear floor, ru 2 7/8 tbg equip. 22:30 - 00:00 1.50 PERF PERF COMP PJSM, poh laying dn 2 7/8 PAC dp. 4/18/2001 00:00 - 05:30 5.50 PERF PERF COMP PJSM, flow check, brk dn guns. Note #1 misfire, #2, 3., 4 fired. 5 thru 138 misfired. Cont lay out guns. 05:30 - 08:00 2.50 PERF PERF COMP Clear floor, lay down Howco equip, PJSM, slip drlg line, adjust brakes, service top dr. 08:00 - 09:30 1.50 PERF PERF COMP Clean / scrub rig. 09:30 - 20:30 11.00 PERF PERF COMP PJSM, flow check, commence rih singles 4" dp. 20:30 - 00:00 3.50 PERF PERF COMP PJSM, flow check, poh standing bk 4" dp in preparation perf op. Note 4 bph losses poh. 4/19/2001 00:00 - 02:00 2.00 PERF PERF COMP Continue POOH. Rack 4" DP in derrick. 02:00 - 02:30 0.50 PERF PERF COMP PJSM regarding TCP guns and perf procedure. 02:30 - 07:00 4.50 PERF PERF COMP M/U HES 2 3/4 4spf TCP gun assembly W/1509ft of perf guns. ( Top shot to be @ 11665', Bottom shot to be @ 14500ft ). 07:00 - 10:00 3.00 PERF PERF COMP PJSM. P/U and follow guns with 29 Jts of 2 7/8 PAC DP. 10:00 - 11:30 1.50 PERF PERF COMP L/D PAC handling tools, make up safety jr, ~orted sub, Champ IV packer, APCA, jars. 11:30 - 18:00 6.50 PERF PERF COMP PJSM. TIH w/perf gun assembly on 4" DP. Tag liner inside PBR @10804 ft. P/U 197k, S/O 162k. 18:00 - 19:30 1.50 PERF PERF 'COMP Pick up 42' to place guns on depth ( 11665'-14500' ). Break circulation, fill C/K manifold and Gas Buster with seawater. Test surface equipment Printed: 51112001 10:30:02 AM BP EXPLORATION Page 11 of 12 Operations Summa Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: Sub Date From-To Hours Task Code Phase Description of Operations 4/19/2001 18:00 - 19:30 1.50 PERF PERF COMP to 3000 psi. PJU Little Red Hot Oil. Displace 4" DP with 33 bbl of diesel to balance formation pressure inside DP ( 275 psi Diff press ). Set packer and test backside to 1000 psi-OK. Continue pressure up on annulus to 2500 psi. The TCP guns fired @ 1435 psi. Sound recorder detected minimum reaction. Bleed annulus to 250 psi. Open packer By-pass. Observe well. No loss or gain. Well static. 19:30 - 21:00 1.50 PERF PERF COMP Line up and reverse circ diesel from dp to cuttings tank. Change over to gas buster at clean returns, cont reverse out 4 bpm @ 490 psi. no losses. Open hydril, release pkr, observe well 30 minutes. Initially the well looked to be static. After observing the well for 30 minutes the hole had took 3 bbl fluid. 21:00 - 00:00 3.00 PERF PERF COMP Flow check. POOH L/D 4" DP. 4/20/2001 00:00 - 06:00 6.00 PERF PERF COMP Cont lay dn 4" dp 06:00 - 07:00 1.00 PERF PERF COMP Flow check, break and lay out perf bha / pkr assy 07:00 - 08:30 1.50 PERF PERF COMP Prepare and lay dn 2 7/8 pac tbg 08:30 - 15:00 6.50 PERF PERF COMP Commence break and lay out spent perf guns, all shots fired. Lost 68 bbl fluid while POOH. 15:00 - 16:30 1.50 RUNCOr~ COMP Clear rig floor, pull wear bshg, Svc top drv, dwks, pipe machine. 16:30 - 00:00 7.50 RUNCOr~ COMP PJSM, flow check, assemble comp bha, rih same, follow with 4 1/2 LB0 12.6 ppf BTC-M Production tbg. ( 126 jts ). Avg M/U torque = 3800 ftlb. 4/21/2001 00:00 - 06:00 6.00 RUNCOr~ COMP Continue running 4.5" 12.6# L-80 BTC-M Production tubing to 10765'. Avg M/U Torque = 3800 ftbl. 06:00 - 09:00 3.00 RUNCOr~ COMP R/U to circulate. Wash F/10765' to 10804' ( 6.5' inside PBR ). P/U and space out. M/U FMC 12" x 4.5" Tubing Hanger & Pup Jt. Land Hanger to confirm correct space out-OK. P/U Tbg Hanger 3'. Ran 239 jts of 4.5" tubing. 09:00 - 12:00 3.00 RUNCOr~ COMP Circulate down 4.5" tubing @ 3 BPM/170 psi with 164 bbl of clean seawater + 135 bbl of Corexit treated seawater + 164 bbl of clean seawater. 12:00 - 13:30 1.50 RUNCOr~ COMP Land 4.5" tubing. WLEG @ 10801'. RILDS. Drop BOT 1 7/8" packer setting Ball/Rod down 4.5" tubing. PJSM. Set packer. Pressure up on tubing to 3500 psi and hold for 30 minutes. Test was APl. Bleed tubing pressure to 2000 psi. Pressure up on 4.5" x 7" annulus to 3500 psi for 10 minutes-OK. Bleed-off tubing pressure slowly. RP Sheared @ 800 psi. 13:30 - 14:30 1.00 RUNCOI~ COMP LID Landing Jr. Install TWC valve. Test to 3000 psi from below and 500 psi from above-OK. Note: Top connection on Hanger is 4 1/2" NSTC. 14:30 - 18:00 3.50 RUNCOI~ COMP N/D BOP's. N/U FMC 4 1/16" 5M Production Tree. 18:00 - 19:00 1.00 RUNCOI~ COMP FMC test void to 5000 psi. Shell test Tree with water to 5000 psi. Both test were APl. Pull TVVC. 19:00 - 21:00 2.00 RUNCOr~ COMP PJSM. R/U HB & R Hot Oil Truck. Freeze protect 4.5" x 7" IA to 2200' with 80 bbl of diesel. Let well U-tube. 21:00 - 22:00 1.00 RUNCOr~ COMP Install BPV in well head and secure well. 22:00 - 00:00 2.00 RUNCOr~ COMP R/D cellar. Blow down all lines. Finish cleaning pits. Release Rig from DS 17-22 @ 24:00 hrs on April 21, 2001. Printed: 5/1/2001 10:30:O2AM BP EXPLORATION Page 12 of 12 Operations Summary Report Legal Well Name: 17-22 Common Well Name: 17-22 Spud Date: 3/13/2001 Event Name: DRILL+COMPLETE Start: 3/12/2001 End: 4/21/2001 Contractor Name: NABORS Rig Release: 4/21/2001 Group: Rig Name: NABORS 9ES Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 3/19/2001 02:30 - 03:00 0.50 BOPSUIq SURF PJSM on N/D Diverter and N/U BOP. Printed: 511/2001 10:30:02 AM Original Well: 17-22 Field: Prudhoe Bay Field / Prudhoe Bay Pool APl: 50-029-23000-00 Permit: 201-019 Date Post-Riq Work 04127/01 Pulled Ball and Rod form 10763' WLM, Set Whiddon Style Catcher sub at 10763' WLM. 04/28/01 Pulled Dummy valves from STA'S #2 at 9522' WLM, #3 at 8210' WLM, #4 at 6694' WLM, #5 at 5215' WLM and #6 at 3692' WLM. Attempted to set LGLV'S in STA'S #5 and #6. All pockets empty except STA #1, Catcher sub and RHC plug still in hole. 04/29/01 Set LGLV'S in STA's #6 at 3692' WLM (16/64, 1970 TRO), #5 at 5215' WLM (16/64, 1963 TRO), #4 at 6694' WLM (16/64, 1947 TRO), #3 at 8216' WLM (16/64, 1931 TRO) and S/O in STA #2 at 9522' WLM (24/64), Attempt to pull Catcher sub, hung up at 8407' WLM and Sheared GS, Catcher sub and RHC still in hole. 04130/2001 Pulled Whiddon style catcher sub from 10,763' WLM, Pulled RHC plug body from 10768' WLM, Post rig G/L complete, 26-Apr-01 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well 17-22 MWD Dear Dear SidMadam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 357.00' MD 'MD 14,819.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED 14AY 01 2001 AlaC, a 0il 8, 6as ~zms. Oonm~ North Slope Alaska Alaska Drilling & Wells PBU EOA DS ~7, Slot ~7-22 ~7-22 MWD Job No. AKMMIO084, Surveyed: 11 April, 2001 SURVEY REPORT RECEIVED JUN 0 ~ ZOO1 Alaska Oi! & Gas Cons. Commission Anchorage 27 April, 2001 Your Ref: APl 500291230000 Surface Coordinates: 5927614.91 N, 709364.74 E (70° 12' 19.8080" N, 148° 18'43.1050" W) Kelly Bushing: 64.80ft above Mean Sea Level =l=,=,r-,r-,~-==u~ rt RII_LINI~ SERVIr"E= A Halliburton Company Survey Ref: svyl0800 Sperry-Sun Drilling Services Survey Report for 17.22 MWD Your Ref: AP1500291230000 Job No. AKMMlO084, Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (ft) Azim. 357.00 0.100 280.000 458.08 0.350 271.460 508.92 0.090 111.800 601.87 0.410 113.420 691.20 1.960 95.500 Sub-Sea Depth (ft) 292.20 393.28 444.12 537.07 626.37 Vertical Depth fit) 357.00 458.08 508.92 601.87 691.17 787.76 4.820 75.120 722.76 787.56 884.64 6.890 72.220 819.13 883.93 980.22 6.900 75.630 914.02 978.82 1075.01 7.430 77.500 1008.07 1072.87 1169.73 8.530 81.870 1101.87 1166.67 1264.82 9.280 84.080 1195.81 1260.61 1358.34 10.290 85.810 1287.97 1352.77 1450.52 10.150 87.630 1378.69 1443.49 1545.15 10.480 90.780 1471.79 1536.59 1637.71 12.380 91.800 1562.51 1627.31 1733.65 13.500 89.610 1656.01 1720.81 1826.52 14.450 94.930 1746.14 1810.94 1918.70 15.100 101.190 1835.27 1900.07 2012.91 16.210 107.430 1925.99 1990.79 2106.67 15.760 110.510 2016.13 2080.93 2197.10 16000 103.810 2103.12 2167.92 2290.02 16.610 99.780 2192.30 2257.10 2384.71 16.520 99.700 2283.06 2347.86 2475.61 16.260 105.720 2370.27 2435.07 2567.97 15.810 109.220 2459.04 2523.84 2661.42 15.440 108.360 2549.04 2613.84 2758.15 15.110 108.180 2642.35 2707.15 2850.74 14.940 112.070 2731.78 2796.58 2944.90 14.490 114.900 2822.85 2887.65 3035.36 14060 117.180 2910.52 2975.32 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 0.18 N 0.87W 5927615.06 N 709363.87 E 0.20 N 1.26W 5927615.07 N 709363.47 E 0.19 N 1.38W 5927615.06 N 709363.35 E 0.03 N 1.01W 5927614.91 N 709363.73 E 0.24 S 0.80 E 5927614.69 N 709365.55 E 0.64 N 6.37 E 5927615.73 N 709371.09 E 3.46 N 15.84E 5927618.81N 709380.48 E 6.64N 26.86 E 5927622.29 N 709391.40 E 9.37 N 38.36 E 5927625.34 N 709402.82 E 11.69 N 51.29 E 5927628.02 N 709415.69 E 13.48 N 65.90 E 5927630.21 N 709430.24 E 14.87 N 81.73 E 5927632.04N 709446.03 E 15.81N 98.06E 5927633.43 N 709462.32 E 16.04 N 114.99 E 5927634.13 N 709479.25 E 15.61 N 133.33 E 5927634.21 N 709497.59 E 15.36 N 154.81E 5927634.56 N 709519.06E 14.44 N 177.19 E 5927634.26 N 709541.47 E 11.12 N 200.43 E 5927631.58 N 709564.79 E 4.80 N 225.02 E 5927625.95 N 709589.54E 3.58 S 249.43 E 5927618.24 N 709614.18 E 10.86 S 273.04E 5927611.62 N 709637.97 E 16.17 S 298.56E 5927607.02 N 709663.64E 20.74 S 325.17 E 5927603.19 N 709690.36 E 26.37 S 350.16 E 5927598.26 N 709715.50 E 34.01S 374.49 E 5927591.29 N 709740.03 E 42.12 S 398.32 E 5927583.85 N 709764.07 E 50.11 S 422.51 E 5927576.53 N 709788.48 E 58.36 S 445.04E 5927568.91N 709811.23 E 67.88 S 466.98 E 5927560.00 N 709833.42 E 77.66 S 487.02 E 5927550.77 N 709853.72 E Dogleg Rate (°/'~00ft) 0.25 0.86 0.34 1.76 3.17 2.16 0.43 0.61 1.33 0.87 1.12 0.38 0.69 2.06 1.27 1.72 1.87 2.14 1.02 2.04 1.38 0.10 1.89 1.15 0.47 0.34 1.10 0.90 0.78 Alaska Drilling & Wells PBU EOA DS 17 Vertical Section Comment -0.86 Tie On Point MWD Magnetic -1.23 -1.33 -0.92 0.83 5.45 12.74 21.27 30.41 41.04 53.40 67.04 81.31 96.45 113.13 132.56 153.10 175.46 2O0.34 225.96 250.38 275.66 301.59 326.53 351.75 376.73 401.99 425.86 449.75 472.05 27 April, 2001 - 3:28 Page 2 offO DrillQ.est 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 MWD Your Ref: APl 500291230000 Job No. AKMMlO084, Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 3130.36 14.570 114.620 3002.57 3067.37 3222.74 15.000 111.510 3091.89 3156.69 3317.18 14.660 111.260 3183.19 3247.99 3413.31 14.530 110.960 3276.21 3341.01 3505.54 14.070 110.990 3365.59 3430.39 3599.46 14.340 112.920 3456.63 3521.43 369205 14.440 112.980 3546.32 3611.12 3785.83 14.420 112.750 3637.14 3701.94 3881.14 14.370 111.590 3729.46 3794.26 3977.70 14.430 109.750 3822.99 3887.79 4070.12 14.820 108.910 3912.41 3977.21 4163.68 15.140 111.730 4002.79 4067.59 4258.88 15.210 113.360 4094.67 4159.47 4323.91 15.060 113.640 4157.45 4222.25 4432.44 15.140 113.650 4262.23 4327.03 4522.32 15.120 114.210 4349.00 4413.80 4616.27 15.140 114.490 4439.69 4504.49 4710.97 14.840 113.200 4531.17 4595.97 4807.44 14.780 112.900 4624.43 4689.23 4900.11 18.360 114.520 4713.24 4778.04 4991.95 23.280 116.230 4799.06 4863.86 5027.62 24.480 115.690 4831.67 4896.47 5085.37 26.940 116.000 4883.70 4948.50 5179.46 30.480 116.060 4966.21 5031.01 5271.78 34.790 116.900 5043.94 5108.74 5368.50 38.520 116.150 5121.52 5186.32 5462.30 41.830 116.860 5193.18 5257.98 555600 45.290 117.240 5261.07 5325.87 5649.38 48.550 118.830 5324.84 5389.64 5744.22 48.340 117.930 5387.75 5452.55 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 87.91S 508.14 E 5927541.12 N 709875.13 E 97.14 S 529.83 E 5927532.50 N 709897.06E 105.95 S 552.34E 5927524.31 N 709919.80 E 114.68 S 574.93 E 5927516.21 N 709942.63 E 122.83 S 596.21 E 5927508.65 N 709964.12 E 131.45 S 617.58 E 5927500.63 N 709985.72 E 140.42 S 638.77 E 5927492.25 N 710007.15 E 149.50 S 660.30 E 5927483.77 N 710028.93 E 158.44 S 682.24 E 5927475.44 N 710051.11 E 166.92 S 704.71 E 5927467.59 N 710073.80 E 174.64S 726.73 E 5927460.48 N 710096.03 E 183.04 S 749.40 E 5927452.71 N 710118.92 E 192.60 S 772.41 E 5927443.80 N 710142.19 E 199.37 S 787.98 E 5927437.46 N 710157.94E 210.71S 813.88 E 5927426.84 N 710184.15 E 220.22 S 835.32E 5927417.93 N 710205.85 E 230.33 S 857.66 E 5927408.44N 710228.46 E 240.24 S 880.06 E 5927399.16 N 710251.12 E 249.89 S 902.75 E 5927390.14 N 710274.07 E 260.55 S 926.93 E 5927380.15 N 710298.54E 274.58 S 956.39 E 5927366.94 N 710328.37 E 280.90 S 969.37 E 5927360.98 N 710341.52 E 291.83 S 991.92 E 5927350.69 N 710364.36 E 311.66 S 1032.52 E 5927331.99 N 710405.50 E 333.87 S 1077.06E 5927311.02 N 710450.65 E 359.64 S 1128.73 E 5927286.69 N 710503.00 E 386.65 S 1182.86E 5927261.19 N 710557.87 E 416.02 S 1240.36 E 5927233.43 N 710616.15 E 448.09 S 1300.54 E 5927203.04 N 710677.20 E 481.82 S 1362.98 E 5927171.05 N 710740.55 E Dogleg Rate (°/t00ft) 0.86 0.98 0.37 0.16 0.50 0.58 0.11 0.06 0.31 0.48 0.48 0.85 0.45 0.26 0.07 0.16 0.08 0.47 0.10 3.89 5.40 3.42 4.27 3.76 4.69 3.88 3.56 3.70 3.71 0.74 Alaska Drilling & Wells PBU EOA DS 17 Vertical Section Comment 495.53 519.07 543.17 567.30 590.00 612.99 635.97 659.31 682.95 706.86 730.04 754.11 778.98 795.95 824.20 847.64 872.16 896.63 921.26 947.67 980.29 994.73 1019.79 1064.98 1114.75 1172.47 1232.97 1297.52 1365.66 1436.57 27 April, 2001 - 3:28 Page 3 oflO DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 MWD Your Ref: APl 500291230000 Job No. AKMMlO084, Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 5839.78 48.350 118.150 5451.27 5516.07 5933.57 48.960 116.520 5513.23 5578.03 6029.06 48.860 115.110 5575.99 5640.79 6121.00 48.630 116.170 5636.62 5701.42 6214.53 48.610 116.520 5698.44 5763.24 6307.99 48.490 117.190 5760.31 5825.11 6403.18 48.980 116.020 5823.09 5887.89 6495.82 49.930 116.190 5883.31 5948.11 6589.42 50.750 114.940 5943.05 6007.85 6683.87 51.090 114.800 6002.60 6067.40 6776.24 49.870 115.350 6061.37 6126.17 6870.13 49.050 115.670 6122.40 6187.20 6962.85 48.320 115.570 6183.61 6248.41 7056.10 48.880 115.010 6245.28 6310.08 7151.21 47.410 115.590 6308.74 6373.54 7247.47 47.790 114.130 6373.65 6438.45 7340.62 48.230 115.240 6435.97 6500.77 7438.06 46.690 115.140 6501.85 6566.65 7532.96 46.740 113.230 6566.92 6631.72 7627.99 47.290 113.090 6631.71 6696.51 7721.98 48.320 113.300 6694.84 6759.64 7811.89 47.510 113.470 6755.10 6819.90 7906.00 48.150 113.650 6818.28 6883.08 7999.58 48.380 113.630 6880.57 6945.37 8094.73 48.390 113.790 6943.76 7008.56 8281.28 47.650 115.450 7068.54 7133.34 8375.54 47.390 115.700 7132.20 7197.00 8470.99 47.410 115.380 7196.81 7261.61 8557.13 47.460 115.020 7255.08 7319.88 8652.39 47.200 113.960 7319.64 7384.44 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 515.39 S 1425.99 E 5927139.25 N 710804.47 E 547.72 S 1488.54 E 5927108.67 N 710867.89 E 579.05 S 1553.32 E 5927079.13 N 710933.52 E 608.96 S 1615.64 E 5927050.97 N 710996.63 E 640.10 $ 1678.53 E 5927021.58 N 711060.36 E 671.75 S 1741.02 E 5926991.68 N 711123.71 E 703.79 S 1805.00 E 5926961.42 N 711188.55 E 734.76 S 1868.21E 5926932.21N 711252.60 E 765.85 S 1933.21 E 5926902.94 N 711318.44E 796.69 S 1999.73 E 5926873.96 N 711385.79 E 826.88 S 2064.27 E 5926845.56 N 711451.14 E 857.61S 2128.67 E 5926816.63 N 711516.36 E 887.72 S 2191.46 E 5926788.27 N 711579.96 E 917.60 S 2254.70 E 5926760.15 N 711644.01 E 947.87 S 2318.75 E 5926731.67 N 711708.87 E 977.75 S 2383.24 E 5926703.59 N 711774.17 E 1006.67 S 2446.15 E 5926676.43 N 711837.85 E 1037.23 $ 2511.11 E 5926647.69 N 711903.64E 1065.53 S 2574.13 E 5926621.14 N 711967.41E 1092.87 S 2638.04 E 5926595.59 N 712032.06E 1120.29 S 2702.05 E 5926569.94 N 712096.80 E 1146.78 S 2763.29 E 5926545,17 N 712158.76 E 1174.66 S 2827.23 E 5926519.07 N 712223.44E 1202.66 S 2891.20 E 5926492.85 N 712288.16 E 1231.26 S 2956.33 E 5926466.06 N 712354.06E 1289.02 S- 3082.40 E 5926411.82 N 712481.68 E 1319.03 S 3145.10 E 5926383.56 N 712545.20 E 1349.32 S 3208.50 E 5926355.04 N 712609.41 E 1376.34 S 3265.90 E 5926329.63 N 712667.54E 1405.37 S 3329.64E 5926302.37 N 712732.06E Dogleg Rate (°il00ft) 0.17 1.46 1.12 0.90 0.28 0.55 1.06 1.03 1.35 0.38 1.40 0.91 0.79 0.75 1.61 1.19 1.00 1.58 1.47 0.59 1.11 0.91 0.69 0.25 0.13 0.77 0.34 0.25 0.31 0.86 Alaska Drilling & Wells PBU EOA DS 17 Vertical Section Comment 1507.91 1578.30 1650.26 1719.38 1789.56 1859,60 1931.14 2001.54 2073.59 2146.90 2218.14 2289.49 2359.13 2429.08 2499.91 2570.98 2640.20 2711.98 2781.03 2850.47 2920.02 2986.69 3056.38 3126.16 3197.24 3335.87 3405.39 3475.65 3539.09 3609.11 27 April, 2001 - 3:28 Page 4 offO DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 MI/VD Your Ref: APl 500291230000 Job No. AKMMIO084, Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 8746.04 46.800 114.100 7383.51 7448.31 8839.04 47.570 114.840 7446.72 7511.52 8931.97 47.410 115.310 7509.51 7574.31 9025.57 48.920 115.570 7571.94 7636.74 9118.76 49.270 115.610 7632.96 7697.76 9213.21 49.030 115.490 7694.74 7759.54 9306.11 49.000 115.920 7755.67 7820.47 9401.34 48.820 115.700 7818.26 7883.06 9494.29 48.720 117.290 7879.52 7944.32 9585.63 48.880 117.340 7939.69 8004.49 9680.60 49.050 117.250 8002.04 8066.84 9775.68 48.350 117.650 8064.79 8129.59 9869.30 47.580 117.070 8127.47 8192.27 9963.41 46.280 116.400 8191.74 8256.54 10057.41 45.610 118.140 8257.11 8321.91 10150.89 47.790 116.940 8321.21 8386.01 10245.13 48.370 115.040 8384.18 8448.98 10339.98 47.790 115.370 8447.55 8512.35 10433.71 47.390 116.710 8510.76 8575.56 10526.08 48.030 115.670 8572.92 8637.72 10622.13 48.550 117.330 8636.83 8701.63 10715.75 48.620 116.710 8698.76 8763.56 10809.27 48.840 118.200 8760.45 8825.25 10904.57 48.830 117.060 8823.18 8887.98 10932.02 48.820 118.060 8841.25 8906.05 10971.60 49.520 118.550 8867.13 8931.93 11002.64 54.090 117.970 8886.31 8951.11 11035.07 60.020 117.410 8903.94 8968.74 11065.11 60.520 113.790 8918.84 8983.64 11098.38 64.470 113.070 8934.21 8999.01 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 1433.26 S 3392.20 E 5926276.23 N 712795.36 E 1461.52 S 3454.29 E 5926249.70 N 712858.21 E 1490.55 S 3516.33 E 5926222.40 N 712921.04E 1520.51S 3579.31E 5926194.20 N 712984.82 E 1550.93 S 3642.83 E 5926165.55 N 713049.16 E 1581.75 S 3707.29 E 5926136.53 N 713114.45 E 1612.16 S 3770.48 E 5926107.88 N 713178.46 E 1643.41S 3835.09 E 5926078.43 N 713243.91 E 1674.60 S 3897.65 E 5926048.99 N 713307.31E 1706.13 S 3958.71 E 5926019.16 N 713369.22 E 1738.98 S 4022.37 E 5925988.09 N 713433.77 E 1771.91S 4085.76 E 5925956.93 N 713498.05 E 1803.87 S 4147.52 E 5925926.70 N 713560.66E 1834.80 S 4208.91 E 5925897.48 N 713622.89 E 1865.74 S 4268.96 E 5925868.21 N 713683.77 E 1897.19 S 4329.28 E 5925838.45 N 713744.94E 1927.91S 4392.31E 5925809.49 N 713808.80 E 1957.96 S 4456.16 E 5925781.22 N 713873.46 E 1988.34 S 4518.34E 5925752.58 N 713936.46E 2018.49 S 4579.66 E 5925724.13 N 713998.58 E 2050.49 S 4643.82 E 5925693.93 N 714063.61 E 2082.38 S 4706.36 E 5925663.78 N 714127.02 E 2114.79 S 4768.73 E 5925633.11 N 714190.26 E 2148.06 S 4832.29 E 5925601.62 N 714254.72 E 2157.62 S 4850.61 E 5925592.57 N 714273.29 E 2171.82 S 4876.98 E 5925579.11 N 714300.04E 2183.36 S 4898.46 E 5925568.16 N 714321.84E 2196.00 S 4922.55 E 5925556.20 N 714346.27 E 2207.27 S 4946.07 E 5925545.59 N 714370.09 E 2219.00 S 4973.14 E 5925534.61 N 714397.48 E Dogleg Rate (°/100ft) 0.44 1.01 0.41 1.63 0.38 0.27 0.35 0.26 1.29 0.18 0.19 0.80 O.94 1.48 1.51 2.51 1.62 0.66 1.14 1.08 1.40 0.50 1.22 0.90 2.74 2.00 14.80 18.34 10.60 12.03 Alaska Drilling & Wells PBU EOA DS 17 Vertical Section Comment 3677.56 3745.76 3814.26 3883.99 3954.42 4025.86 4095.99 4167.77 4237.66 4306.37 4377.98 4449.38 4518.90 4587.63 4655.17 4723.16 4793.28 4863.85 4933.05 5001.38 5073.07 5143.27 5213.53 5285.24 5305.89 5335.81 5360.18 5387.37 5413.44 5442.92 27 April, 2001 - 3:28 Page 5 oflO .. . DrillQ~est 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 MWD Your Ref: APl 500291230000 Job No. AKMMIO084, Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 11128.12 68.760 115.050 8946.01 9010.81 11193.40 78.000 117.140 8964.66 9029.46 11220.48 82.360 117.500 8969.28 9034.08 11250.91 88030 117.330 8971.83 9036.63 11281.12 90.430 115.440 8972.23 9037.03 11318.41 90.800 115.730 8971.83 9036.63 11345.56 90.920 115.380 8971.43 9036.23 11375.84 90.800 115.100 8970.97 9035.77 11405.54 90.800 113.110 8970.56 9035.36 11436.70 90.800 113.100 8970.12 9034.92 11467.64 89.260 110.410 8970.11 9034.91 11499.13 89.010 110.870 8970.58 9035.38 11530.54 88.770 111.230 8971.19 9035.99 11564.61 88.580 110.680 8971.98 9036.78 11595.77 88.590 110.460 8972.75 9037.55 11623.56 88.460 110.650 8973.46 9038.26 11658.80 88.460 111.190 8974.41 9039.21 11689.98 88.590 111.580 8975.21 9040.01 11718.55 88.460 111.520 8975.95 9040.75 11751.30 88.530 111.350 8976.81 9041.61 11782.90 88.280 111.120 8977.69 9042.49 11810.38 88.400 111.560 8978.48 9043.28 11845.32 90.120 112.870 8978.93 9043.73 11876.47 90.250 112.460 8978.83 9043.63 11904.16 90.120 112.070 8978.74 9043.54 11939.13 89.940 112.380 8978.73 9043.53 11970.08 90.120 112.790 8978.71 9043.51 11998.78 88.640 112.240 8979.02 9043.82 12032.21 88.090 112.420 8979.97 9044.77 12063.49 88.160 111.750 8981.00 9045.80 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 2230.13 S 4998.06E 5925524.18 N 714422.69 E 2257.64 S 5054.16 E 5925498.23 N 714479.53 E 2269.88 S 5077.86 E 5925486.65 N 714503.56E 2283.84 S 5104.76 E 5925473.45 N 714530.85 E 2297.26 S 5131.82 E 5925460.78 N 714558.27 E 2313.36 S 5165.45 E 5925445.61 N 714592.33 E 2325.07 S 5189.94 E 5925434.59 N 714617.14 E 2337.98 S 52t7.33 E 5925422.44 N 714644.87 E 2350.11S 5244.44 E 5925411.07 N 714672.30 E 2362.34 S 5273.09 E 5925399.64 N 714701.29 E 2373.80 S 5301.83 E 5925388.98 N 714730.33 E 2384.90 S 5331.29 E 5925378.70 N 714760.09 E 2396.18 S 5360.60 E 5925368.24 N 714789.70 E 2408.36 S 5392.41 E 5925356.94 N 714821.83 E 2419.31 S 5421.57 E 5925346.81 N 714851.29 E 2429.06S 5447.59 E 5925337.78 N 714877.56E 2441.64S 5480.49 E 5925326.12 N 714910.80 E 2453.00 S 5509.51 E 5925315.56 N 714940.13 E 2463.50 S 5536.08 E 5925305.81 N 714966.98 E 2475.46 S 5566.55 E 5925294.70 N 714997.77 E 2486.90 S 5596.00 E 5925284.08 N 715027.52 E 2496.90 S 5621.58 E 5925274.79 N 715053.37 E 2510.10 S 5653.92 E 5925262.49 N 715086.07 E 2522.11S 5682.67 E 5925251.28 N 715115.13 E 2532.60 S 5708.29 E 5925241.51 N 715141.04E 2545.83 S 5740.66 E 5925229.18 N 715173.76 E 2557.71S 5769.24 E 5925218.09 N 715202.66E 2568.70 S 5795.75 E 5925207.84 N 715229.46 E 2581.40 S 5826.66 E 5925196.01 N 715260.71 E 2593.15 S 5855.63 E 5925185.06N 715290.00 E Dogleg Rate (°/100ft) 15.67 14.48 16.15 18.64 10.11 1.26 1.36 1.01 6.70 0.03 10.02 1.66 1.38 1.71 0.71 0.83 1.53 1.32 0.50 0.56 1.07 1.66 6.19 1.38 1.48 1.03 1.45 5.50 1.73 2.15 Alaska Drilling & Wells PBU EOA DS 17 Vertical Section Comment 5470.20 5532.68 5559.34 5589.64 5619.85 5657.13 5684.28 5714.56 5744.24 5775.36 5806.21 5837.57 5868.86 5902.79 5933.81 5961.47 5996.56 6027.64 6056.12 6088.76 6120.24 6147.62 6182.49 6213.59 6241.22 6276.12 6307.02 6335.66 6369.02 6400.21 27 April, 2001 - 3:28 Page 6 oflO DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 MWD Your Ref: APl 50029'1230000 Job No. AKMM'10084, Surveyed: '1'1 April, 200'1 North Slope Alaska Measured Depth (ft) Sub-Sea Depth (ft) Vertical Depth 12090.92 88.040 111.700 8981.91 9046.71 12123.74 87.850 112.010 8983.08 9047.88 12154.35 87.840 112.210 8984.23 9049.03 12182.55 88.280 113.970 8985.19 9049.99 12216.49 88.030 114.830 8986.28 9051.08 12248.01 87.840 114.400 8987.42 9052.22 12276.37 89.880 114.290 8987.98 9052.78 12310.71 90.000 113.950 8988.02 9052.82 12342.02 90.060 115.250 8988.00 9052.80 12370.59 90.060 115.030 8987.97 9052.77 12404.88 89.820 115.250 8988.01 9052.81 12436.31 89.880 115.260 8988.09 9052.89 12464.05 89.690 116.000 8988.19 9052.99 12497.53 89.320 118.820 8988.48 9053.28 12529.37 89.880 118.980 8988.71 9053.51 12557.24 90.120 119.240 8988.71 9053.51 12590.93 89.690 117.610 8988.76 9053.56 12622.08 91.420 117.840 8988.46 9053.26 12649.87 91.600 117.290 8987.73 9052.53 12684.21 91.420 118.270 8986.82 9051.62 12715.07 91.110 118.980 8986.14 9050.94 12743.09 91.110 118.970 8985.60 9050.40 12778.25 90.800 118.660 8985.01 9049.81 12809.57 90.680 118.040 8984.61 9049.41 12837.56 90.610 118.030 8984.29 9049.09 12871.93 90.430 118.160 8983.98 9048.78 12903.02 90.310 118.320 8983.78 9048.58 12931.36 90.430 118.350 8983.60 9048.40 12965.01 90.490 117.780 8983.33 9048.13 12996.18 90.680 117.460 8983.01 9047.81 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 2603.30 S 5881.10 E 5925175.62 N 715315.74 E 2615.51S 5911.54E 5925164.26 N 715346.51 E 2627.02 S 5939.88 E 5925153.54 N 715375.15 E 2638.08 S 5965.80 E 5925143.21 N 715401.37 E 2652.09 S 5996.70 E 5925130.06 N 715432.64E 2665.21S 6025.33 E 5925117.74 N 715461.63 E 2676.90 S 6051.16 E 5925106.77 N 715487.78 E 2690.93 S 6082.51E 5925093.61N 715519.50 E 2703.96 S 6110.97 E 5925081.37 N 715548.31 E 2716.10 S 6136.84E 5925069.95 N 715574.50 E 2730.67 S 6167.88 E 5925056.25 N 715605.94 E 2744.08 S 6196.30 E 5925043.64 N 715634.72 E 2756.08 S 6221.31 E 5925032.34 N 715660.06E 2771.49 S 6251.03 E 5925017.75 N 715690.19 E 2786.87 S 6278.91 E 5925003.15 N 715718.48 E 2800.43 S 6303.26 E 5924990.27 N 715743.20 E 2816.47 S 6332.88 E 5924975.06N 715773.26 E 2830.96 S 6360.45 E 5924961.34 N 715801.22 E 2843,82 S 6385.08 E 5924949.17 N 715826.19 E 2859.81S 6415.45 E 5924934.02 N 715857.00 E 2874.60 S 6442.53 E 5924919.99 N 715884.48 E 2888.17 S 6467.04 E 5924907.11 N 715909.35 E 2905.11S 6497.84E 5924891.02 N 715940.61 E 2919.98 S 6525.40 E 5924876.92 N 715968.57 E 2933.14 S 6550.11 E 5924864.46 N 715993.63 E 2949.32 S 6580.43 E 5924849.12 N 716024.39 E 2964.03 S 6607.82 E 5924835.17 N 716052.18 E 2977.48 S 6632.76 E 5924822.42 N 716077.48 E 2993.31S 6662.45 E 5924807.42 N 716107.60 E 3007.76 S 6690.07 E 5924793.74 N 716135.61 E Dogleg Rate (°/100ft) 0.47 1.11 0.65 6.43 2.64 1.49 7.20 1.05 4.16 0.77 0.95 0.19 2.75 8.49 1.83 1.27 5.00 5.60 2.08 2.90 2.51 0.04 1.25 2.02 0.25 0.65 0.64 0.44 1.70 1.19 Alaska Drilling & Wells PBU EOADS 17 Vertical Section Comment 6427.55 6460.27 6490.79 6518.94 6552.85 6584.34 6612.69 6647.01 6678.31 6706.88 6741.17 6772.59 6800.33 6833.80 6865.59 6893.42 6927.07 6958.20 6985.97 7020.28 7051.10 7079.07 7114.18 7145.47 7173.44 7207.78 7238.85 7267.16 7300.78 7331.94 27 April, 2001 - 3:28 Page 7 oflO DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 MWD Your Ref: AP1 500291230000 Job No. AKMM10084, Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (ft) Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 13024.02 90.550 117.620 8982.71 9047.51 13058.11 90.490 117.410 8982.40 9047.20 13089.34 90.430 117.590 8982.15 9046.95 13117.38 90.550 117.800 8981.91 9046.71 13152.17 90.860 117.720 8981.48 9046.28 13184.24 90.860 117.530 8981.00 9045.80 13210.61 90.860 117.530 8980.60 9045.40 13245.02 90.680 117.660 8980.14 9044.94 13276.07 90.860 117.320 8979.73 9044.53 13306.78 90.430 116.810 8979.38 9044.18 13339.34 89.940 115.860 8979.27 9044.07 13370.83 89.510 115.930 8979.43 9044.23 13398.83 89.380 116.720 8979.70 9044.50 13432.84 88.090 117.730 8980.45 9045.25 13463.94 88.030 117.520 8981.50 9046.30 13491.82 88.090 117.900 8982.44 9047.24 13526.52 88.340 117.770 8983.52 9048.32 13558.32 88.400 117.800 8984.43 9049.23 13586.53 88.650 117.870 8985.16 9049.96 13621.13 88.460 117.630 8986.03 9050.83 13652.14 88.210 117.560 8986.93 9051.73 13679.18 89.010 119.130 8987.59 9052.39 13713.00 89.750 120.300 8987.95 9052.75 13744.61 89.570 120.080 8988.14 9052.94 13773.12 89.750 119.970 8988.31 9053.11 13807.42 89.510 119.890 8988.53 9053.33 13839.13 89.630 121.190 8988.77 9053.57 13866.81 91.110 123.210 8988.59 9053.39 13901.27 90.680 123.790 8988.05 9052.85 13932.61 90.370 124.130 8987.76 9052.56 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3020.63 S 6714.75 E 5924781.56 N 716160.64E 3036.38 S 6744.99 E 5924766.65 N 716191.30 E 3050.80 S 6772.69 E 5924753.01 N 716219.39 E 3063.83 S 6797.51 E 5924740.67 N 716244.57 E 3080.04 S 6828.30 E 5924725.32 N 716275.79 E 3094.9t S 6856.71 E 5924711.25 N 716304.60 E 3107.09 S 6880.09 E 5924699.71 N 716328.31 E 3123.03 S 6910.58 E 5924684.63 N 716359.23 E 3137.36 S 6938.12 E 5924671.07 N 716387.16 E 3151.33 S 6965.47 E 5924657.86 N 716414.88 E 3165.78 S 6994.65 E 5924644.23 N 716444.45 E 3179.53 S 7022.98 E 5924631.27 N 716473.15 E 3191.95 S 7048.07 E 5924619.55 N 716498.58 E 3207.50 S 7078.31E 5924604.84N 716529.23 E 3221.91S 7105.84E 5924591.20 N 716557,16 E 3234.87 S 7130.51 E 5924578.93 N 716582.18 E 3251.06 S 7161.18 E 5924563.59 N 716613.28 E 3265.88 S 7189.30 E 5924549.56 N 716641.81 E 3279.05 S 7214.24 E 5924537.09 N 716667.10 E 3295.16 S 7244.85 E 5924521.83 N 716698.15 E 3309.51S 7272.32 E 5924508.24 N 716726.00 E 3322.35 S 7296.11 E 5924496.07 N 716750.14 E 3339.11S 7325.48 E 5924480.13 N 716779.96E 3355.01S 7352.81 E 5924465.00 N 716807.72 E 3369.27 S 7377.49 E 5924451.42 N 716832.79 E 3386.38 S 7407.22 E 5924435.14 N 716862.97 E 3402.50 S 7434.52 E 5924419.79 N 716890.72 E 3417.25 S 7457.95 E 5924405.70 N 716914.54E 3436.26 S 7486.68 E 5924387.48 N 716943.79 E 3453.77 S 7512.67 E 5924370.71N 716970.26 E Dogleg Rate (°/100ft) 0.74 0.64 0.61 0.86 0.92 0.59 0.00 0.65 1.24 2.17 3.28 1.38 2.86 4.82 0.70 1.38 0.81 0.21 0.92 0.88 0.84 6.51 4.09 0.90 0.74 0.74 4.12 9.05 2.10 1.47 Alaska Drilling & Wells PBU EOADS 17 Vertical Section Comment 7359.76 7393.84 7425.06 7453.08 7487.85 7519.90 7546.26 7580.65 7611.68 7642.39 7674.94 7706.43 7734.43 7768.42 7799.49 7827.34 7862.00 7893.77 7921.96 7956.53 7987.51 8014.52 8O48.26 8079.78 8108.22 8142.43 8174.03 8201.54 8235.70 8266.72 27 April, 2001 - 3:28 Page 8 of 10 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 MI/VD Your Reft APl 500291230000 Job No. AKMMlO084, Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (ft) Sub-Sea Depth (ft) Vertical Depth (ft) 13960.17 92.330 124.280 8987.11 9051.91 13994.77 92.270 124.500 8985.73 9050.53 14026.32 92.150 124.360 8984.51 9049.31 14054,16 91.910 124.360 8983.52 9048.32 14088.29 91.720 124.270 8982.44 9047.24 14119.82 91.350 124.160 8981.60 9046.40 14146.91 91.230 123.970 8980.99 9045.79 14181.52 91.110 124.010 8980.28 9045.08 14212.35 91.110 123.920 8979.68 9044.48 14239.87 89.820 126.330 8979.46 9044.26 14273.45 88.580 127.620 8979.93 9044.73 14305.08 88,460 127.600 8980.75 9045.55 14332.60 87.910 128.000 8981.62 9046.42 14367.33 88.150 128.480 8982.81 9047.61 14398.20 88.960 130.400 8983.59 9048.39 14426.76 88.340 130.510 8984.26 9049.06 14460.46 89.390 131.070 8984.93 9049.73 14491.18 90.000 131.300 8985.09 9049.89 14519.50 89.630 130.730 8985.18 9049.98 14554.28 89.320 130.000 8985.50 9050.30 14585.86 89.380 129.420 8985.86 9050.66 14613.88 89.450 131.980 8986.15 9050.95 14648.47 88.830 133.250 8986.67 9051.47 14679.58 88.580 132.040 8987.37 9052.17 14707.86 88.890 132.060 8987.99 9052.79 14738.38 88.770 133.650 8988.62 9053.42 14819.00 88.770 133.650 8990.35 9055.15 Local Coordinates Global Coordinates Northings Easfings Northings Eastings (ft) (ft) (ft) (ft) 3469.26 S 7535.46 E 5924355.86 N 716993.46 E 3488.78 S 7563.99 E 5924337.13 N 717022.52 E 3506.61 S 7589.99 E 5924320.03 N 717049.01 E 3522.31 S 7612.96 E 5924304.97 N 717072.40 E 3541.54S 7641.13 E 5924286.53 N 717101.10 E 3559.27 S 7667.20 E 5924269.53 N 717127.65 E 3574.44 S 7689.63 E 5924254.99 N 717150.49 E 3593.78'S 7718.32 E 5924236.45 N 717179.71 E 3611.00 S 7743.89 E 5924219.94 N 717205.74 E 3626.83 S 7766.39 E 5924204.74 N 717228.68 E 3647.03 S 7793.22 E 5924185.30 N 717256.05 E 3666.32 S 7818.26 E 5924166.70 N 717281.62 E 3683.18 S 7840.00 E 5924150.45 N 717303.82 E 3704.67 S 7867.26 E 5924129.73 N 717331.66 E 3724.27 S 7891.09 E 5924110.80 N 717356.03 E 3742.80 S 7912.82 E 5924092.88 N 717378.26 E 3764.81S 7938.33 E 5924071.59 N 717404.37 E 3785.04 S 7961.45 E 5924052.01 N 717428.04 E 3803.62 S 7982.81E 5924034.02 N 717449.92 E 3826.15 S 8009.31E 5924012.24 N 717477.03 E 3846.32 S 8033.60 E 5923992.74 N 717501.87 E 3864.59 S 8054.84 E 5923975.07 N 717523.61 E 3888.01S 8080.30 E 5923952.37 N 717549.70 E 3909.08 S 8103.17 E 5923931.94 N 717573.15 E 3928.01 S 8124.17 E 5923913.59 N 717594.66 E 3948.77 S 8146.54 E 5923893.47 N 717617.60 E 4004.40 S 8204.86 E 5923839.47 N 717677.44E Dogleg Rate (o/looft) 7.13 0.66 0.58 0.86 0.62 1.22 0.83 0.37 0.29 9.93 5.33 0.38 2.47 1.54 6.75 2.20 3.53 2.12 2.40 2.28 1.85 9.14 4.09 3.97 1.10 5.22 0.00 Alaska Drilling & Wells PBU EOADS17 Vertical Section Comment 8293.99 8328.18 8359.35 8386.87 8420.62 8451.80 8478.61 8512.87 8543.39 8570.55 8603.50 8634.46 8661.37 8695.28 8725.28 8752.91 8785.47 8815.10 8842.44 8876.12 8906.78 8933.87 8966.99 8996.77 9023.92 9053.11 9129.87 Projected Survey 27 April, 200'1 - 3:28 Page 9 oflO DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 MWD Your Ref: APl 500291230000 Job No. AKMMlO084, Surveyed: 11 April, 2001 North Slope Alaska Alaska Drilling & Wells PBU EOADS 17 All data is in Feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.882° (12-Mar-01) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well and calculated along an Azimuth of 115.890° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14819.00ft., The Bottom Hole Displacement is 9129.89ft., in the Direction of 116.015° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 357.00 357.00 0.18 N 0.87 W 14819.00 9055.15 4004.40 S 8204.86 E Comment Tie On Point Projected Survey Survey tool program for 17.22 MWD From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0.00 357.00 357.00 357.00 357.00 14819.00 9055.15 Survey Tool Description Tolerable Gyro (17-22 GYRO) MWD Magnetic (17-22 MWD) 27 April, 2001 - 3:28 Page fO of 10 DrillQuest 2.00.08.005 O FIN T VE North Slope Alaska Alaska Drilling & Wells PBU EOA DS ~ 7', Slot ~ 7'-22 17-22 Job No. AKZZ'IO095, Surveyed: 'il April, 2001 S UR VEY REPORT 27 April, 2001 Your Ref: APl 50029f230000 Surface Coordinates: 5927614.9f N, 709364.74 E (70° f2' 19.8080" N, Kelly Bushing: 64.80ft above Mean Sea Level 148°f8'43.1050"W) DRILLING SERVICE== A Halliburton Company Survey Ref: svy10799 Sperry-SUn DnTiing Services Survey Report for 17-22 Your Ref: AP1 500291230000 Job No. AKZZ10095, Surveyed: 11 April, 2001 DEFiNiTiVE North Slope Alaska Measured Depth (ft) Incl. 357.00 0.100 280.000 458.08 0.350 271.460 508.92 0.090 111.420 601.87 0.410 112.500 691.20 1.960 95.040 Sub-Sea Depth (ft) 292.20 393.28 444.12 537.07 626.37 Vertical Depth (ft) 357.00 458.08 508.92 601.87 691.17 787.76 4.820 75.070 722.76 787.56 884.64 6.890 72.250 819.13 883.93 980.22 6.900 75.700 914.02 978.82 1075.01 7.430 77.600 1008.07 1072.87 1169.73 8.530 82.390 1101.87 1166.67 1264.82 9.280 84.720 1195.81 1260.61 1358.34 10.290 86.520 1287.97 1352.77 1450.52 10.150 88.380 1378.69 1443.49 1545.15 10.480 90.600 1471.79 1536.59 1637.71 12.380 91.740 1562.51 1627.31 1733.65 13.500 89.370 1656.01 1720.81 1826.52 14.450 94.600 1746.14 1810.94 1918.70 15.100 100.790 1835.27 1900.07 2012.91 16.210 107.010 1925.99 1990.79 2106.67 15.760 110.080 2016.13 2080.93 2197.10 16.000 103.420 2103.12 2167.92 2290.02 16.610 99.420 2192.30 2257.10 2384.71 16.520 99.360 2283.06 2347.86 2475.61 16.260 105.430 2370.27 2435.07 2567.97 15.810 108.940 2459.04 2523.84 2661.42 15.440 108.060 2549.04 2613.84 2758.15 15.110 107.910 2642.35 2707.15 2850.74 14.940 111.770 2731.78 2796.58 2944.90 14.490 114.540 2822.85 2887.65 3035.36 14.060 117.050 2910.52 2975.32 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 0.18 N 0.87W 5927615.06 N 709363.87 E 0.20 N 1.26W 5927615.07 N 709363.47 E 0.19 N 1.38W 5927615.06 N 709363.35 E 0.03 N 1.01W 5927614.92 N 709363.73 E 0.22 S 0.81 E 5927614.71 N 709365.56 E 0.68 N 6.38 E 5927615.77 N 709371.09 E 3.50 N 15.84 E 5927618.85 N 709380.48 E 6.67 N 26.87 E 5927622.32 N 709391.41 E 9.39 N 38.37 E 5927625.36 N 709402.84E 11.63 N 51.32 E 5927627.96 N 709415.71E 13.27 N 65.94 E 5927630.01 N 709430.29 E 14.47 N 81.79 E 5927631.64N 709446.09 E 15.20 N 98.12 E 5927632.83 N 709462.40 E 15.35 N 115.06E 5927633.44 N 709479.33 E 14.96 N 133.40 E 5927633.56 N 709497.68 E 14.77 N 154.88 E 5927633.97 N 709519.15 E 13.96 N 177.27 E 5927633.78 N 709541.56 E 10.79 N 200.53 E 5927631.25 N 709564.89 E 4.64N 225.16 E 5927625.79 N 709589.69 E 3.56 S 249.64 E 5927618.28 N 709614.38 E 10.67 S 273.29 E 5927611.82 N 709638.23 E 15.81S 298.85 E 5927607.39 N 709663.92 E 20.22 S 325.49 E 5927603.72 N 709690.66 E 25.70 S 350.51E 5927598.93 N 709715.83 E 33.23 S 374.87 E 5927592.09 N 709740.39 E 41.22 S 398.74 E 5927584.76 N 709764.47 E 49.09 S 422.98 E 5927577.57 N 709788.92 E 57.22 S 445.55 E 5927570.06N 709811.70 E 66.62 S 467.54E 5927561.28 N 709833.94 E 76.31S 487.62 E 5927552.14 N 709854.29 E Dogleg Rate (°/100ft) 0.25 0.86 0.34 1.76 3.16 2.16 0.43 0.61 1.36 0.88 1.13 0.39 0.55 2.07 1.29 1.7O 1.85 2.13 1.02 2.03 1.37 0.10 1.90 1.16 0.47 O.34 1.10 0.89 0.83 Alaska Drilling & Wells PBU EOA DS 17 Vertical Section Comment -0.86 Tie On Point AK-6 BP IFR-AK -- -1.23 -1.33 -0.92 0.82 5.44 12.73 21.26 30.42 41.09 53.53 67.26 81,64 96.81 113.48 132.89 153.38 175.69 200.53 226.13 250.52 275.76 301.65 326.55 351.76 376.72 401.96 425.82 449.70 472.00 27 April, 2001 - 3:28 Page 2 oflO DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 Your Ref: AP150029f230000 Job No. AKZZ10095, Surveyed: f f April, 2001 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 3130.36 14.570 114.610 3002.57 3067.37 3222.74 15000 111.490 3091.89 3156.69 3317.18 14.660 110.990 3183.19 3247.99 3413.31 14,530 110.710 3276.21 3341.01 3505.54 14070 110.770 3365.59 3430.39 3599.46 14.340 112.630 3456.63 3521.43 3692,05 14.440 112.870 3546.32 3611.12 3785.83 14.420 112.490 3637.14 3701.94 3881.14 14.370 111.760 3729.46 3794.26 3977.70 14.430 110.100 3822.99 3887.79 4070.12 14.820 109.270 3912.41 3977.21 4163.68 15.140 111.400 4002.79 4067.59 4258.88 15.210 113.110 4094.67 4159.47 4323.91 15.060 113.330 4157.45 4222.25 4432.44 15.140 112.980 4262.23 4327.03 4522.32 15.120 113.630 4348.99 4413.79 4616.27 15.140 113.800 4439.69 4504.49 4710.97 14.840 112.640 4531.17 4595.97 4807.44 14.780 112.340 4624.43 4689.23 4900.11 18.360 113.980 4713.24 4778.04 4991.95 23.280 115.650 4799.06 4863.86 5027.62 24,480 115.080 4831.67 4896.47 5085.37 26.940 115.660 4883.70 4948.50 5179.46 30.480 115,850 4966.21 5031.01 5271.78 34.790 116.700 5043.94 5108.74 5368.50 38.520 116.110 5121.52 5186.32 5462.30 41.830 116.760 5193.18 5257.98 5556.00 45.290 117.230 5261.07 5325.87 5649.38 48.550 118.850 5324.84 5389.64 5744.22 48.340 117.420 5387.75 5452.55 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 86.54 S 508.76 E 5927542.51N 709875.70 E 95.76 S 530.45 E 5927533.89 N 709897.64E 104.52 S 552.98 E 5927525.76 N 709920.40 E 113.14 S 575.61 E 5927517.77 N 709943.27 E 121.20 S 596.92 E 5927510.30 N 709964.79 E 129.73 S 618.33 E 5927502.37 N 709986.43 E 138.63 S 639.55 E 5927494.06 N 710007.89 E 147.64 S 661.11E 5927485.65 N 710029.69 E 156.56 S 683.06E 5927477.34N 710051.88 E 165.14 S 705.49 E 5927469.39 N 710074.53 E 173.00 S 727.46 E 5927462.14 N 710096.71 E 181.40 S 750.13 E 5927454.37 N 710119.61 E 190.84 S 773.19 E 5927445.57 N 710142.92 E 197.54 S 788.79 E 5927439.31 N 710158.71 E 208.65 S 814.79 E 5927428.92 N 710185.00 E 217.93 S 836.33 E 5927420.24 N 710206.79 E 227.80 S 858.79 E 5927411.01 N 710229.51 E 237.46 S 881.29 E 5927401.97 N 710252.28 E 246.89 S 904.08 E 5927393.18 N 710275.31E 257.32 S 928.35 E 5927383.43 N 710299,87 E 271.06 S 957.95 E 5927370.51 N 710329.83 E 277.24 S 971.00 E 5927364.69 N 710343.05 E 287.98 S 993.63 E 5927354.58 N 710365.97 E 307.62 S 1034.33 E 5927336.08 N 710407.20 E 329.68 S 1078.95 E 5927315.27 N 710452.41 E 355.34 S 1130.66 E 5927291.05 N 710504.82 E 382.28 S 1184.84 E 5927265.62 N 710559.72 E 411.60 S 1242.36 E 5927237.91 N 710618.03 E 443.67 S 1302.53 E 5927207.51 N 710679.07 E 477.14 S 1365.11 E 5927175.79 N 710742.56 E Dogleg Rate (°/100ft) 0.83 0.98 0.38 0.15 0.50 0.56 0.13 0.10 0.20 0.43 0.48 0.68 0.48 0.25 0.11 0.19 0.05 0.45 0.10 3.90 5.40 3.43 4.28 3.76 4.69 3.87 3.56 3.71 3.71 1.15 Alaska Drilling & Wells PBU EOADS17 Vertical Section Comment 495.48 519.02 543.11 567.24 589.93 612.91 635.89 659.22 682.87 706.79 729.98 754.O5 778.92 795.88 824.12 847.55 872.06 896.53 921.14 947.53 980.16 994.60 1019.65 1064.84 1114.61 1172.34 1232.84 1297.39 1365.53 1436.44 27 April, 2001 - 3:28 Page 3 of 10 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 Your Reft APl 500291230000 Job No. AKZZ10095, Surveyed: If April, 2001 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 5839.78 48.350 117.480 5451.27 5516.07 5933.57 48.960 117.960 5513.22 5578.02 6029.06 48.860 116.670 5575.99 5640.79 6121.00 48.630 117.010 5636.61 5701.41 6214.53 48.610 117.520 5698.44 5763.24 6307.99 48.490 117.520 5760.31 5825.11 6403.18 48.980 116.410 5823.09 5887.89 6495.82 49.930 116.450 5883.31 5948.11 6589.42 50.750 115.770 5943.05 6007.85 6683.87 51.090 115.550 6002.59 6067.39 6776.24 49.870 115.840 6061.37 6126.17 6870.13 49.050 115.560 6122.39 6187.19 6962.85 48.320 115.050 6183.61 6248.41 7056.10 48.880 114.400 6245.28 6310.08 7151.21 47.410 114.420 6308.74 6373.54 7247.47 47.790 113.710 6373.64 6438.44 7340.62 48.230 113.980 6435.96 6500.76 7438.06 46.690 113.870 6501.84 6566.64 7532.96 46.740 113.390 6566.91 6631.71 7627.99 47.290 113.740 6631.70 6696.50 7721.98 48.320 113.670 6694.83 6759.63 7811.89 47.510 113.530 6755.09 6819.89 7906.00 48.150 113.430 6818.26 6883.06 7999.58 48.380 113.230 6880.56 6945.36 8094.73 48.390 113.700 6943.75 7008.55 8281.28 47.650 115.210 7068.53 7133.33 8375.54 47.390 115.120 7132.19 7196.99 8470.99 47.410 115.310 7196.80 7261.60 8557.13 47.460 115.200 7255.06 7319.86 8652.39 47.200 114.190 7319.63 7384.43 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 510.05 S 1428.47 E 5927144.65 N 710806.80 E 542.81 S 1490.80 E 5927113.64 N 710870.02 E 575.83 S 1554.75 E 5927082.40 N 710934.85 E 607.04 S 1616.42 E 5927052.91 N 710997.36 E 639.19 S 1678.80 E 5927022.50 N 711060.61E 671.55 S 1740.93 E 5926991.87 N 711123.61 E 704.00 S 1804.70 E 5926961.21 N 711188.26 E 735.33 S 1867.73 E 5926931.63 N 711252.14 E 767.04 S 1932.44E 5926901.73 N 711317.70 E 798.79 S 1998.53 E 5926871.83 N 711384.64E 829.68 S 2062.73 E 5926842.72 N 711449.68 E 860.62 S 2127.03 E 5926813.58 N 711514.80 E 890.39 S 2189.98 E 5926785.56 N 711578.56 E 919.65 S 2253.52 E 5926758.08 N 711642.88 E 948.92 S 2318.03 E 5926730.61 N 711708.18 E 977.91S 2382.93 E 5926703.43 N 711773.86 E 1005.89 S 2446.26 E 5926677.21N · 711837.94 E 1035.01S 2511.88 E 5926649.92 N 711904.34E 1062.70 S 2575.17 E 5926624.00 N 711968.38 E 1090.49 S 2638.89 E 5926597.98 N 712032.84E 1118.49 S 2702.65 E 5926571.77 N 712097.35 E 1145.20 S 2763.79 E 5926546.76 N 712159.21 E 1172.99 S 2827.77 E 5926520.75 N 712223.93 E 1200.65 S 2891.89 E 5926494.88 N 712288.80 E 1228.97 S 2957.14 E 5926468.38 N 712354.81 E 1286.37 S 3083.38 E 5926414.50 N 712482.59 E 1315.93 S 3146.29 E 5926386.70 N 712546.30 E 1345.86 S 3209.86 E 5926358.54N 712610.67 E 1372.93 S 3267.24 E 5926333.07 N 712668.78 E 1402.19 $ 3330.87 E 5926305.58 N 712733.20 E Dogleg Rate (°/100ft) 0.05 0.76 1.02 0.37 0.41 0.13 1.02 1.03 1 .O4 0.40 1.34 0.90 0.89 0.80 1.55 0.67 0.52 1.58 0.37 0.64 1.10 0.91 0.68 0.29 0.37 0.72 0.28 0.15 0.11 0.83 Alaska Drilling & Wells PBU EOADS17 Vertical Section Comment 1507.82 1578.19 1650.14 1719.24 1789.40 1859.43 1930.96 2001.36 2073.41 2146.73 2217.98 2289.33 2358.97 2428.90 2499.72 2570.76 2639.95 2711.70 278O.73 2850.19 2919.77 2986.45 3056.14 3125.90 3196.97 3335.60 3405.11 3475.36 3538.80 3608.83 27 April, 2001 - 3:28 Page 4 oflO DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 Your Ref: APl 500299230000 Job No. AKZZIOOgS, Surveyed: ff April, 2001 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 8746.04 46.800 114.300 7383.50 7448.30 8839.04 47.570 115.160 7446.70 7511.50 8931.97 47.410 115.400 7509.50 7574.30 9025.57 48.920 115.430 7571.93 7636.73. 9118.76 49.270 115.440 7632.95 7697.75 9213.21 49.030 115.290 7694.73 7759.53 9306.11 49.000 115.800 7755.66 7820.46 9401.34 48.820 115.550 7818.25 7883.05 9494.29 48.720 116.580 7879.51 7944.31 9585.63 48.880 116.560 7939.67 8004.47 9680.60 49.050 117.130 8002.02 8066.82 9775.68 48.350 117.060 8064.78 8129.58 9869.30 47.580 116.600 8127.46 8192.26 9963.41 46.280 116.650 8191.73 8256.53 10057.41 45.610 115.830 8257.09 8321.89 10150.89 47.790 116.310 8321.20 8386.00 10245.13 48.370 114.930 8384.16 8448.96 10339.98 47.790 115.520 8447.53 8512.33 10433.71 47.390 115.420 8510.74 8575.54 10526.08 48.030 115.690 8572.90 8637.70 10622.13 48.550 116.230 8636.80 8701.60 10715.75 48.620 115.310 8698.74 8763.54 10809.27 48.840 117.410 8760.43 8825.23 10904.57 48.830 118.750 8823.16 8887.96 10932.02 48.820 119.380 8841.23 8906.03 10971,60 49.520 118.550 8867.11 8931.91 11002.64 54.090 117.230 8886.30 8951.10 11035.07 60.020 117.410 8903.92 8968.72 11065.11 60.520 113.220 8918.83 8983.63 11098.38 64.470 112.260 8934.19 8998.99 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 1430.32 S 3393.32 E 5926279.20 N 712796.41 E 1458.86 S 3455.28 E 5926252.39 N 712859.13 E 1488.11S 3517.23 E 5926224.86 N 712921.86 E 1518.04 S 3580.22 E 5926196.69 N 712985.66E 1548.29 S 3643.82 E 5926168.21 N 713050.08 E 1578.90 S 3708.38 E 5926139.41 N 713115.46 E 1609.14 S 3771.65 E 5926110.93 N 713179.54E 1640.23 S 3836.34 E 5926081.64 N 713245.07 E 1670.95 S 3899.13 E 5926052.68 N 713308.69 E 1701.69 S 3960.60 E 5926023.65 N 713370.98 E 1734.04 S 4024.51 E 5925993.09 N 713435.77 E 1766.57 S 4088.10 E 5925962.33 N 713500.24 E 1797.96 S 4150.15 E 5925932.68 N 713563.13 E 1828.77 S 4211.61 E 5925903.58 N 713625.42 E 1858.64S 4272.20 E 5925875.40 N 713686.82 E 1888.54 S 4333.31E 5925847.21N 713748.73 E 1918.85 S 4396.53 E 5925818.66 N 713812.77 E 1948.93 S 4460.38 E 5925790.36 N 713877.42 E 1978.69 S 4522.86 E 5925762.35 N 713940.70 E 2008.17 S 4584.50 E 5925734.59 N 714003.14 E 2039.56 S 4648.97 E 5925705.00 N 714068.45 E 2070.08 S 4712.19 E 5925676.24 N 714132.50 E 2101.29 S 4775.17 E 5925646.79 N 714196.32 E 2135.06 S 4838.46 E 5925614.79 N 714260.52 E 2145.09 S 4856.52 E 5925605.25 N 714278.86 E 2159.60 S 4882.73 E 5925591.48 N 714305.45 E 2171.00 S 4904.28 E 5925580.69 N 714327.32 E 2183.48 S 4928.45 E 5925568.88 N 714351.82 E 2194.63 S 4952.03 E 5925558.38 N 714375.69 E 2206.03 S 4979.24 E 5925547.74 N 714403.21 E Dogleg Rate (°/100ft) 0.44 1.07 0.26 1.61 0.38 0.28 0.42 0.27 0.84 0.18 0.49 0.74 0.90 1.38 0.95 2.36 1.25 0.77 O.43 0.73 0.69 0.74 1.70 1.06 1.73 2.38 15.10 18.29 12.23 12.15 Alaska Drilling & Wells PBU EOADS17 Vertical Section Comment 3677.29 3745.49 3813.99 3883.73 3954.16 4025.60 4095.73 4167.50 4237.40 4306.12 4377.75 4449.16 4518.69 4587.43 4654.98 4723.01 4793.13 4863.70 4932.90 5001.23 5072.93 5143.14 5213.42 5285.11 5305.74 5335.64 5360.01 5387.21 5413.28 5442.74 27 April, 2001 - 3:28 Page 5 of lO DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 Your Reft AP! 500291230000 Job No. AKZZIO095, Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (rt) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 11128.12 68.760 113.920 8945.99 9010.79 11193.40 78.000 116.430 8964.65 9029.45 11220.48 82.360 116.720 8969.26 9034.06 11250.91 88.030 116.780 8971.81 9036.61 11281.12 90.430 114.890 8972.22 9037.02 11318.41 90.800 115.070 8971.82 9036.62 11345.56 90.920 115.090 8971.41 9036.21 11375.84 90.800 115.240 8970.95 9035.75 11405.54 90.800 113.300 8970.54 9035.34 11436.70 90.800 112.990 8970.10 9034.90 11467.64 89.260 111.080 8970.09 9034.89 11499.13 89.010 111,030 8970.56 9035.36 11530.54 88.770 111.590 8971.17 9035.97 11564.61 88.580 111.330 8971.96 9036.76 11595.77 88.590 111.400 8972.73 9037.53 11623.56 88.460 111.290 8973.44 9038.24 11658.80 88.460 111.470 8974.39 9039.19 11689.98 88.590 111.700 8975.19 9039.99 11718.55 88.460 111.520 8975.93 9040.73 11751.30 88.530 111.740 8976.79 9041.59 11782.90 88.280 111.310 8977.67 9042.47 11810.38 88.400 111.710 8978.47 9043.27 11845.32 90.120 113.120 8978.92 9043.72 11876.47 90.250 112.650 8978.82 9043.62 11904.16 90.120 112.180 8978.73 9043.53 11939.13 89.940 112.320 8978.71 9043.51 11970,08 90.120 112.670 8978.69 9043.49 11998.78 88.640 112.200 8979.00 9043.80 12032.21 88.090 111.680 8979.96 9044.76 12063.49 88.160 110.960 8980.98 9045.78 Local Coordinates Global Coordinates Northings Easfings Northings Eastings (ft) (ft) (ft) (ft) 2216.74 S 5004.34E 5925537.73 N 714428.60 E 2243.35 S 5060.87 E 5925512.70 N 714485.85 E 2255.28 S 5084.73 E 5925501.44 N 714510.03 E 2268.92 $ 5111.79 E 5925488.55 N 714537.46 E 2282.09 S 5138.98 E 5925476.14 N 714565.00E 2297.83 S 5172.78 E 5925461.34 N 714599.22 E 2309.34 S 5197.37 E 5925450.52 N 714624.12 E 2322.21S 5224.77 E 5925438.41N 714651.87 E 2334.42 S 5251.84E 5925426.96 N 714679.27 E 2346.67 S 5280.49 E 5925415.51 N 714708.25 E 2358.27 S 5309.17 E 5925404.70 N 714737.23 E 2369.59 S 5338.55 E 5925394.21N 714766.92 E 2381.00 S 5367.81 E 5925383.61 N 714796.48 E 2393.46 S 5399.51 E 5925372.04 N 714828.52 E 2404.81S 5428.52 E 5925361.50 N 714857.83 E 2414.92 S 5454.39 E 5925352.10 N 714883.97 E 2427.76 S 5487.20 E 5925340.18 N 714917.12 E 2439.23 S 5516.18 E 5925329.52 N 714946.41 E 2449.75 S 5542.73 E 5925319.74 N 714973.25 E 2461.81S 5573.17 E 5925308.52 N 715004.00 E 2473.40 S 5602.55 E 5925297.75 N 715033.70 E 2483.48 S 5628.11 E 5925288.39 N 715059.52 E 2496.80 S 5660.40 E 5925275.97 N 715092.17 E 2508.91S 5689.10 E 5925264.65 N 715121.20 E 2519.47 S 5714.70 E 5925254.81 N 715147.08 E 2532.71S 5747.06E 5925242.47 N 715179.80 E 2544.55 S 5775.66E 5925231.43 N 715208.71 E 2555.50 S 5802.18 E 5925221.21 N 715235.53 E 2567.99 S 5833.18 E 5925209.59 N 715266.86 E 2579.36 S 5862.30 E 5925199.04 N 715296.29 E Dogleg Rate (°/~OOft) 15.31 14.62 16.13 18.63 10.11 1.10 O.45 0.63 6.53 0.99 7.93 0.81 1.94 0.95 0.23 0.61 0.51 0.85 0.78 0.70 1.57 1.52 6.37 1.57 1.76 0.65 1.27 5.41 2.26 2.31 Alaska Drilling & Wells PBU EOA DS 17 Vertical Section Comment 5470.00 5532.48 5559.15 5589.46 5619.66 5656.94 5684.09 5714.36 5744.05 5775.17 5806.03 5837.41 5868.71 5902.67 5933.73 5961.42 5996.54 6027.62 6056.10 6088.75 6120.24 6147,63 6182.50 6213.61 6241.25 6276.15 6307.04 6335.69 6369.03 6400.19 27 April, 2001 - 3:28 Page 6 of 10 DrillQttest 2,00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 Your Ref: APl 500291230000 Job No. AKZZfO095, Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 12090.92 88.040 111.370 8981.89 9046.69 12123.74 87.850 111.070 8983.07 9047.87 12154.35 87.840 111.720 8984.22 9049.02 12182.55 88.280 113.830 8985.17 9049.97 12216.49 88.030 114.290 8986.27 9051.07 12248.01 87.840 113.980 8987.40 9052.20 12276.37 89.880 114.030 8987.97 9052.77 12310.71 90.000 114.560 8988.00 9052.80 12342.02 90.060 114.340 8987.98 9052.78 12370.59 90.060 115.130 8987.95 9052.75 12404,88 89.820 115.630 8987.99 9052.79 12436.31 89.880 115.830 8988.07 9052.87 12464.05 89.690 116.580 8988.18 9052.98 12497.53 89.320 119.010 8988.47 9053.27 12529.37 89.880 119.660 8988.69 9053.49 12557.24 90.120 119.190 8988.69 9053.49 12590.93 89.690 118.970 8988.74 9053.54 12622.08 91.420 119.120 8988.44 9053.24 12649.87 91.600 119.420 8987.71 9052.51 12684.21 91.420 117.900 8986.81 9051.61 12715.07 91.110 119.150 8986.12 9050.92 12743.09 91.110 118.720 8985.58 9050.38 12778.25 90800 118.600 8985.00 9049.80 12809.57 90.680 118.000 8984.59 9049.39 12837.56 90.610 118.090 8984.28 9049.08 12871.93 90,430 118.310 8983.96 9048.76 12903.02 90.310 118.290 8983.76 9048.56 12931.36 90.430 118.310 8983.58 9048.38 12965.01 90.490 117.840 8983.31 9048.11 12996.18 90.680 117.510 8982.99 9047.79 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 2589.25 S 5887.87 E 5925189.85 N 715322.12 E 2601.13 S 5918.44 E 5925178.83 N 715353.01 E 2612.28 S 5946.92 E 5925168.47 N 715381.79 E 2623.19 S 5972.91E 5925158.28 N 715408.06E 2637.02 S 6003.88 E 5925145.32 N 715439.41 E 2649.90 S 6032.63 E 5925133.24 N 715468.50 E 2661.44 S 6058.53 E 5925122.43 N 715494.71 E 2675.57 S 6089.83 E 5925109.17 N 715526.39 E 2688.53 S 6118.33 E 5925097.01 N 715555.24E 2700.48 S 6144.28 E 5925085.78 N 715581.51E 2715.18 S 6175.26 E 5925071.94 N 715612.89 E 2728.82 S 6203.57 E 5925059.09 N 715641.57 E 2741.07 S 6228.46 E 5925047.53 N 715666.79 E 2756.68 S 6258.08 E 5925032.75 N 715696.82 E 2772.28 S 6285.83 E 5925017.93 N 715725.00 E 2785.97 S 6310.11 E 5925004.91 N 715749.64E 2802.35 S 6339.55 E 5924989.36 N 715779.53 E 2817.47 S 8366.78 E 5924975.00 N 715807.17 E 2831.05 S 8391.01 E 5924962.09 N 715831.77 E 2847.51S 6421.13 E 5924946.47 N 715862.34E 2862.25 S 6448.24 E 5924932.50 N 715889.84 E 2875.80 S 6472.76 E 5924919.63 N 715914.72 E 2892.66 S 6503.61E 5924903.63 N 715946.03 E 2907.51S 6531.18 E 5924889.55 N 715974.00 E 2920.67 S 6555.88 E 5924877.08 N 715999.06 E 2936.91S 6586.17 E 5924861.69 N 716029.79 E 2951.65 S 6613.55 E 5924847.71N 716057.56 E 2965.08 S 6638.50 E 5924834.97 N 716082.87 E 2980.92 $ 6668.19 E 5924819.97 N 716112.99 E 2995.40 S 6695.79 E 5924806.26 N 716140.98 E Dogleg Rate (°/'~00ft) 1.56 1.08 2.12 7.64 1.54 1.15 7.20 1.58 0.73 2.77 1.62 0.66 2.79 7.34 2.69 1.89 1.43 5.57 1.26 4.46 4.17 1.53 0.95 1.95 0.41 0.83 0.39 0.43 1.41 1.22 Alaska Drilling & Wells PBU EOADS 17 Vertical Section Comment 6427.51 6460.2O 6490.70 6518.84 6552.74 6584.23 6612.56 6646.89 6678.19 6706.75 6741.04 6772.47 6800.21 6833.67 6865.45 6893.27 6926.90 6958.00 6985.74 702O.02 7050.84 7078.82 7113.93 7145.22 7173.19 7207.53 7238.59 7266.91 7300.53 7331.68 27 April, 2001.3:28 Page 7 oflO DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 17-22 Your Reft APl 500291230000 Job No. AKZZlO095, Surveyed: Il April, 2001 North Slope Alaska Measured Depth (ft) Sub-Sea Depth (ft) Vertical Depth (ft) 13024.02 90.550 117.590 8982.69 9047.49 13058,11 90.490 117.380 8982.38 9047.18 13089.34 90.430 117.690 8982.13 9046.93 13117.38 90.550 117.840 8981.89 9046.69 13152.17 90.860 117.240 8981.46 9046.26 13184.24 90.860 117.060 8980.98 9045.78 13210.61 90.860 117.020 8980.59 9045.39 13245.02 90.680 116.870 8980.13 9044.93 13276.07 90.860 117.060 8979.71 9044.51 13306.78 90.430 116.380 8979.36 9044.16 13339.34 89.940 116.430 8979.26 9044.06 13370.83 89.510 116.540 8979.41 9044.21 13398.83 89.380 117.210 8979.68 9044.48 13432.84 88.090 117.870 8980.43 9045.23 13463.94 88.030 117.650 8981.48 9046.28 13491.82 88.090 118.010 8982.43 9047.23 13526.52 88.340 117,830 8983.51 9048.31 13558.32 88.400 117.830 8984.41 9049.21 13586.53 88.650 117.920 8985.14 9049.94 13621.13 88.460 117,740 8986.01 9050.81 13652.14 88.210 117.690 8986.91 9051.71 13679.18 89.010 119.120 8987.57 9052.37 13713.00 89.750 120.070 8987.93 9052.73 13744.61 89.570 119.840 8988.12 9052.92 13773.12 89.750 119.800 8988.29 9053.09 13807.42 89,510 119.620 8988.51 9053.31 13839.13 89.630 121.000 8988.75 9053.55 13866.81 91.110 123.120 8988.57 9053.37 13901.27 90.680 123.190 8988.03 9052.83 13932.61 90.370 124,000 8987.75 9052.55 Local Coordinates Global Coordinates Northings Easfings Northings Eastings (ft) (ft) (ft) (ft) 3008.27 S 6720.47 E 5924794.07 N 716166.01 E 3024.00S 6750.71 E 5924779.19 N 716196.68 E 3038.44 S 6778.40 E 5924765.52 N 716224.76 E 3051,50 S 6803.21 E 5924753.15 N 716249.92 E 3067.59 S 6834.06E 5924737.93 N 716281.20 E 3082.22 S 6862.59 E 5924724.09 N 716310.13 E 3094.21S 6886.08 E 5924712.76 N 716333.94 E 3109.80 S 6916.75 E 5924698.03 N 716365.03 E 3123.88 S 6944.42 E 5924684.72 N 716393.08 E 3137.68 S 6971.85 E 5924671.68 N 716420.88 E 3152.16 S 7001.01 E 5924658.01 N 716450.44E 3166.21S 7029.20 E 5924644.76 N 716479.00 E 3178.86 S 7054.17 E 5924632.80 N 716504.31 E 3194.58 S 7084.32 E 5924617.92 N 716534.89 E 3209,06S 7111.83 E 5924604.21N 716562.78 E 3222.07 S 7136.47 E 5924591.89 N 716587.77 E 3238.31S 7167.11E 5924576.50 N 716618.86 E 3253.15 S 7195.22 E 5924562.45 N 716647.37 E 3266.33 S 7220.15 E 5924549.96N 716672.65 E 3282.48 S 7250.74 E 5924534.67 N 716703.68 E 3296.90 S 7278.18 E 5924521.02 N 716731.51E 3309.76 S 7301~96 E 5924508.82 N 716755.63 E 3326.46 S 7331.36 E 5924492.94 N 716785.49 E 3342.24 S 7358.75 E 5924477.92 N 716813.30 E 3356.42 S 7383.48 E 5924464.44 N 716838.42 E 3373.42 S 7413.27 E 5924448.27 N 716868.67 E 3389.42 S 7440.65 E 5924433.03 N 716896.48 E 3404.11S 7464.11 E 5924419.00 N 716920.33 E 3422.95 S 7492.95 E 5924400.96 N 716949.69 E 3440.29 S 7519.06 E 5924384.35 N 716976.26 E Dogleg Rate (°/100ft) Alaska Drilling & Wells PBU EOADS 17 Vertical Section Comment O.55 7359.51 O.64 7393.59 1.01 7424.80 0.69 7452.83 1.94 7487.60 O.56 7519.66 0.15 7546.02 O.68 758O.42 0.84 7611.46 2.62 7642.17 1.51 7674.73 1.41 7706.21 2.44 7734.21 4.26 7768.19 0.73 7799.26 1.31 7827.11 0.89 7861.77 0.19 7893.54 0.94 7921.72 0.76 7956.29 0.82 7987.27 6.06 8014.28 3.56 8048.02 0.92 8079.55 0.65 8108.00 0.87 8142.22 4.37 8173.83 9.34 8201.35 1.26 8235.53 2.77 8266.58 27 April, 2001 - 3:28 Page 8 of fO DrillOuesf 2.00. 08.005 Sperry-Sun DnTling Services Survey Report for 17-22 Your Ref: AP1500291230000 Job No. AKZZ10095,. Surveyed: 11 April, 2001 North Slope Alaska Measured Depth (ft) Sub-Sea Depth (ft) Vertical Depth fit) 13960.17 92.330 124,210 8987.10 9051.90 13994.77 92.270 124.220 8985.71 9050.51 14026.32 92.150 124,060 8984.49 9049.29 14054.16 91,910 123.960 8983.51 9048.31 14088.29 91,720 124,230 8982.42 9047.22 14119.82 91.350 124.050 8981.58 9046.38 14146.91 91.230 123.880 8980.97 9045.77 14181.52 91.110 124.400 8980.26 9045.06 14212.35 91.110 124.180 8979.67 9044.47 14239.87 89.820 126.550 8979.44 9044.24 14273.45 88,580 127,800 8979.91 9044.71 14305.08 88.460 127.860 8980.73 9045.53 14332.60 87.910 128.340 8981.60 9046.40 14367.33 88.150 128,560 8982.79 9047.59 14398.20 88.960 130.560 8983.57 9048.37 14426.76 88.340 130.460 8984.25 9049.05 14460.46 89.390 130.800 8984.91 9049.71 14491.18 90.000 131.280 8985.08 9049.88 14519.50 89.630 130.620 8985.17 9049.97 14554.28 89.320 129.660 8985.49 9050.29 14585.86 89.380 129.100 8985.84 9050.64 14613.88 89.450 131,250 8986.13 9050.93 14648.47 88,830 132.610 8986.65 9051.45 14679.58 88.580 132.900 8987.35 9052.15 14707.86 88.890 132,360 8987.98 9052.78 14738.38 88.770 133.430 8988.60 9053.40 14819.00 88,770 133.430 8990.33 9055.13 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3455.74 S 7541.87 E 5924369,54 N 716999.50 E 3475.18 S 7570.46 E 5924350.90 N 717028.61 E 3492.88 S 7596.55 E 5924333.94 N 717055.19 E 3508.44 S 7619.61E 5924319.02 N 717078,67 E 3527.56 S 7647.86 E 5924300.69 N 717107.44E 3545.25 S 7673.95 E 5924283.73 N 717134.01E 3560.38 S 7696.41 E 5924269.23 N 717156.88 E 3579.80 S 7725.05 E 5924250.61N 717186.05 E 3597.17 S 7750.52 E 5924233.96 N 717211.99 E 3613.09 S 7772.96E 5924218.66 N 717234.86 E 3633.38 S 7799.71 E 5924199.12 N 717262.16 E 3652.77 S 7824.68 E 5924180.43 N 717287.67 E 3669.74 S 7846.33 E 5924164.06 N 717309.77 E 3691.33 S 7873.51 E 5924143.24 N 717337.54E 3710.98 S 7897.30 E 5924124.25 N 717361.87 E 3729.53 S 7919.01 E 5924106.32 N 717384.08E 3751.47 S 7944.58 E 5924085.09 N 717410.25 E 3771.64 S 7967.75 E 5924065.57 N 717433.97 E 3790.20 S 7989.14 E 5924047.61 N 717455.87 E 3812.62 S 8015.73 E 5924025.94 N 717483.07 E 3832.65 S 8040.14 E 5924006.59 N 717508.02 E 3850.73 S 8061.54E 5923989.11 N 717529.92 E 3873.84 S 8087.27 E 5923966.72 N 717556,28 E 3894.95 S 8110.11 E 5923946.25 N 717579,69 E 3914.10 S 8130.91 E 5923927.69 N 717601.02 E 3934.87 S 8153.27 E 5923907.55 N 717623.94E 3990.28 S 8211.80 E 5923853.78 N 717683,99 E Dogleg Rate (°/100ft) 7.15 0.18 0.63 0.93 0.97 1.30 0.77 1.54 0.71 9.80 5.24 0.42 2.65 0.94 6.99 2.20 3.27 2.53 2.67 2.90 1.78 7.68 4.32 1.23 2.20 3.53 0.00 Alaska Drilling & Wells PBU EOADS 17 Vertical Section Comment 8293.85 8328.06 8359.26 8386.80 8420.57 8451.76 6478.57 8512.82 8543.31 8570.45 8603.38 8634.32 8661.20 8695.O8 8725.06 8752.69 8785.27 8814.93 8842.27 8875.98 8906.69 8933.84 8967.08 8996.84 9023.92 9053.10 9129.95 Projected Survey DrillQuest 2.00.08.005 27 April, 2001 - 3:28 Page 9 of fO Sperry-Sun Drilling Services Survey Report for 17-22 Your Ref: AP1 500291230000 Job No. AKZZlO095, Surveyed: 11 April, 2001 North Slope Alaska Alaska Drilling & Wells PBU EOADS 17 All data is in Feet unless otherwise stated. Directions and coordinates are relative to True North. Vedical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.882° (12-Mar-01) The Dogleg Severity is in Degrees per 100 feet. Vedical Section is from Well and calculated along an Azimuth of 115.890° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14819.00ft., The Bottom Hole Displacement is 9129.95ft., in the Direction of 115.916° (True). Comments Measured Station Coordinates Depth 'I'VD Northings Eastings (ft) (ft) (ft) (ft) 357.00 357.00 0.18 N 0.87 W 14819.00 9055.13 3990.28 S 8211.80 E Comment Tie On Point Projected Survey Survey tool program for 17-22 From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0.00 357.00 357.00 357.00 14819.00 Survey Tool Description 357.00 · Tolerable Gyro (17-22 GYRO) 9055.13 AK-6 BP_IFR-AK (17-22) 27 April, 2001 - 3:28 Page 10 of 10 DrillQuest 2.00.08.005 26-Apr-01 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well 17-22 GYRO Dear Dear SidMadam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 'MD 'MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED Il/kY 01 Almtm0~&Gas Con~. .Ancb~ DEFiNiTiVE North Slope Alaska Alaska Drilling & Wells PBU 'EOA DS ~7, Slot ~7.22 f7-22 GYRO Job No. AKMMlO084, Surveyed: 11 April, 2001 S UR VEY REPORT 27 Aprfl, 200f Your Reft AP1500291230000 Surface Coordinates: 5927614.91 N, 709364.74 E (70° 12' 19.8080" N, 148° 18'43.1050" Vi/) Kelly Bushing: 64.80ft above Mean Sea Level DRILLING SERVICE5 A Halliburton Company Survey Ref: svyf0798 Sperry. Sun Drilling Services Survey Report for 17-22 GYRO Your Reft APl 50029f230000 Job No. AKMMlO084, Surveyed: 11 April, 2001 DEF:IN T VE North Slope Alaska Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 0.00 0.000 0.000 -64.80 0.00 0.00 N 0.00 E 5927614.91 N 709364.74 E 79.00 0.000 0.000 14.20 79.00 0.00 N 0.00 E 5927614.91 N 709364.74 E 172.00 0.100 288.000 107.20 172.00 0.03 N 0.08 W 5927614.93 N 709364.66 E 265.00 0.400 280.000 200,20 265.00 0.11 N 0.47 W 5927615.00 N 709364.26 E 357.00 0.100 280.000 292.20 357.00 0.18 N 0.87 W 5927615,06 N 709363.87 E All data is in Feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.882° (12-Mar-01) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well and calculated along an Azimuth of 115.890° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 357.00ft., The Bottom Hole Displacement is 0.89ft., in the Direction of 281.459° (True). Dogleg Rate (°/100ft) 0.00 0.11 0.32 0.33 Alaska Drilling & Wells PBU EOA DS 17 Vertical Section Comment 0.00 0.00 -0.08 -0.47 -0.86 Tolerable Gyro Survey tool program for 17.22 GYRO From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0,00 357.00 357.00 Survey Tool Description Tolerable Gyro DrillQuest 2.00.08.005 27 April, 2001 - 3:27 Page 2 of 2 FW: 17-22 APD Subject: FW: 17-:22 APB Date: Wed, 7 Feb 2001 17:17:58 -0600 From: "Schmitz, Steve H (Fainveather)" <SchmitSH@bp.com> To: "Tom Maunder (E-mail 2)" <tom_maunder@admin.state.ak.us> forwarding .... <<17-22 Permit to Drill .doc>> ..... Original Message ..... From: Schmitz, Steve H (Fairweather) Sent: Wednesday, February 07, 2001 10:16 AM To: Tom Maunder (E-mail) Cc: Stone, Dan M Subject: 17-22 APD Gentlemen, The following points/issues are clarified or rectified, relating to the APD that is pending approval by the AOGCC: .. 1. A diverter will be utilized as indicated on page 4. ~age S,~Rig Operations" step 2 has been edited to remove the verbal blinded outlet" and the verbage "and function tested' has been inserted. 2.~ Page S_.,,,,"Rig Operations" step 15. The verbage addressing kick ma?gfn'h~s been changed to notify the Supt. if less than 50 bbls is calculated. (omit the 40 bbls). 3.~~Job 2: Drilling Surface Hole: The information "Produced wat~n has over-pressured the Cretaceous zone to g.o EMW" has been moved to Job 4 Drilling Intermediate Hole. The doghouse hazards information page remains the same. 4. ~ Page 3,~7'ail TOC, as defined in the plan, is designed for 1000' abo'~=~D"~f the intermediate casing setting depth of 10983. Tail TOC is gg83' (not 10983'). Attached is the APD supporting documentation with these corrections. Please advise if additonal clarification is needed. <<17-22 Permit to Drill .doc>> Steve Schmitz BP Alaska Drilling & Wells (907) 564-5773 Phone (907) 564-4040 Fax (907) 240.8094 Cell SchmitSH@bp. com I of 2 2/7/01 3:38 PM 17-22 Subject: 17-22 Date: Thu, 8 Feb 2001 21:13:51 -0000 From: "Schmitz, Steve H (Fairweather)" <SchmitSH@BP.com> To: "'Tom_Maunder@admin.state.ak. us'" <Tom_Maunder@admin.state.ak.us>, "'tom_maunder@admin.state.ak. us'" <tom_maunder@admin. state.ak, us> Tom, The SV3 is in the surface hole and is not overpressured with injection water. The UGNU Cretaceous sands are in the intermediate hole and are over-pressured to approx 9.0 ppg due to injection water. Does that clear things up? Call or e-mail to discuss. Steve Schmitz BP Alaska Drilling & Wells (907) 564-5773 Phone (907) 564-4040 Fax (907) 240-8094 Cell SchmitSH@bp.com I of 1 2/8/01 12:51 PM ~KA OIL AND GAS CONSERYA~ION C0~SSION TONY KNOWLES, GOVERNOR 333 W. 7* AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dan Stone Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit 17-22 BP Exploration (Alaska) Inc. Permit No: 201-019 Sur Loc: 2246'NSL, 4183'WEL, Sec. 22, T10N, R15E, UM Btmhole Loc. 2012'SNL, 4129'EWL, Sec. 26, T10N, R15E, UM Dear Mr. Stone: Enclosed is the apprOved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. ',flSaniel t. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION · DATED this //¢2 ~:4~ day of February, 2001 rill/Enclosures cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. .~l' STATE Of ALASKA ALASK/~' L AND GAS CONSERVATION COMk{' 31ON PERMIT TO DRILL 20 AAC 25.005 i [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [][] Re-EntryDdll [][] DeepenRedrill lb. Type of well [] Service [] Development Gas ~ S~ ~le Zone [] Multiple Zone 2. Name of Operator ~5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Planned RKB = 64.4' Prudhoe Bay Field / Prudhoe 3. Address 6., Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ~ :. DL 028333 4. Location of well at surface 7. Unit or Property Nar~ .11. Type Bond (See 2O AAC 25.025) 2246' NSL, 4183' WEL, SEC. 22, T10N, R15E, UM (As Staked) Prudhoe Bay Unit At top of productive interval 8. Well Number 4' NSL, 929' EWL, SEC. 23, T10N, R15E, UM 17-22 Number 2S100302630-277 At total depth 9. Approximate spud date 2012' SNL, 4129' EWL, SEC. 26, T10N, R15E, UM 02/15/01 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028332, 2012' MDI No Close Approach 2560 15116' MD / 9057' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 500' MD Maximum Hole Angle 91 ° Maximum surface 2720 psig, At total depth (TVD) 8800' / 3600 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Wei,qht Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 WLD 145' Surface Surface 145' 145' ~60 sx Arctic Set (Approx.) 13-1/2" 10-3/4" 45.5# L-80 BTC-M 4246' Surface Surface 4246' 4145' B79 sx Arcticset Lite 3, 202 sx Class 9-7/8" 7" 26# L-80 BTC-M 10983' Surface Surface 10983' 8931' __.97 sx Class 'G' 6-1/8" 4-1/2" 12.6# L-80 BTC-M 4266' 10864' 8800' 15116' 9057' 526 sx Class'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate RECEi Production Liner VE'D JAN 1 8 200/ Alaska Oil Perforation depth: measured &AGna~s Cons. Commission true vertical chorage 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Steve Schmitz, 564-5773 ~_~",~t'",.J" //t"7/'o ! Prepared By Name/Numbec Sondra Stewman, 564-4750 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Dan Stone ~----"~.,~ -.-,~. ~ Title Senior Drilling Engineer Date , C t'~ t~ ~.'..". ..... '.:.':'. ' .. :.' ::"..': .. .... .:."~ .v "...:.....'.......':.... i... :.?r...::.....::. ·: .... :.' '.'::': '.: '~ :Commission: ,Use. Only ..... ::.:....::~.. :.: ::~:..i;;;::':.. ?,]'.! ::,'i"':;'.:;"':]!~.::: :;:;:;;i"i"..',:':?':'].:ii'".! i'?,'i:'??'iii Permit Number IAPiNumber I' Appr°valDate' ..~.,~ /'v ISeec°verletter ~2.,CJ>/'-(~/~ 50-/,_~ ,- ~--,d::~:3 _,~../..~. - {,// for other requirements Conditior~s of Approval: Samples Required [] Yes I~No Mud Log Required [] Yes Hydrogen Sulfide Measures .l~['Yes [] No Directional Survey Required I~Yes [] No Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K [] 3.5K psi Other: ORIGINAL S~<'_:.'~',,~'::!~','~ ~.~'~.,' D Taylor Sear'noun~ by order of Ap. proved By Commissioner the commission Date ¢;~ Form 10-401 Rev. 12-01-85 Submit In Triplicate I Well Name: [ 17-22 Drill and Complete Plan Summary I Type of Well (service / producer / injector): I Producer Surface Location: Target Location: Zone 4B Ivishak Sand Bottom Hole Location: X = 709365 Y = 5927614 Conductor Slot: Staked 2246' FSL 4183' FEL S22 T10N R15E Umiat X = 714543 Y = 5925517 TVDss 8970 4' FSL 929' FWL S23, T10N, R15E Umiat X = 717801 Y = 5923592 TVDss 8991 2012' FNL 4129' FWL S26, T10N, R15E Umiat I AFE Number: 14J0467 I Estimated Start Date: 1 2/15/2001 MD: 115116 lTV[:): 19057' I Rig: I Nabors 9ES I Operating days to complete: 132 I BF/MS: 136.0' I IRKS: 164.4' I Well Design (conventional, slimhole, etc.): I Slimhole I Obiective: I Zone 4B, 4A Ivishak Sand Mud Program: 13-1/2" Surface (0-4246'SVl): 10 3,4" Csq Fresh Water Surface Hole Mud Interval Den'sity Visc(~sity YP Tau, Gel-10 Fluid (ppg) (seconds) Ibfll00ft2 sec Loss Initial 8.5-9.6 300 50..70 12 19/55 15-20 Interval TD 9.1-9.6 100 25..35 22-25 12/25 < 15 9-7/8" Intermediate (4246 - 10983' TSGR ~:7" Csq Freshwater LSND/6% KCI/GEM Interval Density Viscosity YP PV pH APl HTHP TD (ppg) (seconds) Filtrate Filtrate. 10983' 9.8-10.5 45-55 20-25 10-17 9.0-9.5 15-10 6 1/8" Production (10983' -15116,: 4 1/2" Liner Low Density! Quick Drill N Interval Density Viscosity YP PV pH APl HTHP TD (ppg) (seconds) Filtrate Filtrate 15115' 8.3-8.5 40-50 20-25 5-8 9.0-9.5 <-10 Permitto Drill JAN ~- 8 ~[1t Page 1 Naska Oil & Gas Cons. Commission Anchorage Directional: KOP: 1500' MD build 2.5/00 Maximum Hole Angle: Close Approach Wells: 91 deg. EOB 5411', hold 48 deg. to intermediate casing point Land & drill horizontal 90 degree leg 11264-15116' TD No Close Approach Issues Logging Program: Surface Intermediate Production Drilling: DIR / GR Drilling: DIR/GR Drilling: DIR/GR/4PHRES Formation Markers Formation Tops MDbkb TVDss Comments Base Permafrost 1920 1920 8.60 SV2 3843 SV1 4079 UG4/K15-C1 4792 UG1/UgS 5760 R~'~'~ ~ WS1/West Sak 6526 JAN.1 8 2007 CM3/K12 6782 Al~ka Oil a Ancoo}~' ~°mmiSsioo THrZ 8498 LCU 8681 Top Kingak/JB 8703 3600 psi ~ 8800' TVDss, 7.9 ppg EMW Sag River 8857 Shublik 8881 Top Sadlerochit 8950 TD 8991 Criteria: Reservoir"pinch-out HOT 8993 Avoid penetrating~ Aquifer below. OWC 9026 Permit to Drill Page 2 Casin(,t/Tubing Proqram: Hole Csgl Wt/Ft Grade C~)nn Length To~ Btm Size Tbg MD/TVD MDrrVD O.D. 30" 20' 9'1.'5# H-40 WLD ~145' GL ~145'M0 i'3-1/2" 10-3/4" 45'.5~ L-80 BTC'M 4246' GL " '4246/4145 9-7/8" 7" 26~ L-80 BTC-M 10983' "GL ''' 10983/8931 6 1/8" 4 ~. 12.6~ L-80' BTC-M 4266 10864/8786 15116/9057 Tubing 4-1/2' 12,6# L-80 NSCT 5900 GL 5900/5544 4 %" 12.6# 13Cr NSCT 4933 5900 10864/8786 **Note: Cross-over to Chrome, NSCT tubing from 5900 to packer depth! Cement Calculations: Casing Size 110-3/4" Surface w/port collar @1000' for contingency 2na stage. I Basis: Lead: Based on 1910' of annulus in the permafrost @ 175% excess and open hole from top of tail slurry to base permafrost @ 30% excess. Lead TOC: To surface Tail: Based on 500' MD open hole volume + 30% excess + 80' shoe track volume. Tail TOC: At ~4700' MD (3100' TVDbkb). ITotal Cement Volume: Lead 1537 bbl 1 3015 ff~ / 679 sks of Dowell ARTICSET Lite 3 at .10~.7.p. pg an.d 4~44. cfisk. Tail . 42 bbl/236 ft~ / 202 sks of Dowell Premium 'G' at 15.8 ppg and 1.17 cf/sk. Casing size 17" Intermediate Casing ! Basis: Lead: N/A Lead TOC: N/A Tail: Based on TOC 1000' above TD and 30% excess + 80' shoe track Volume. Tail TOC: 9983' MD Total Cement Volume: Lead [N/A Tail 16t bbls 1 344 ft~ / 297 sks of Dowell Premium 'G' at 15.8 I ppg and 1.16 cf/sk. Casing Size 14 %" Production Liner I Basis: Lead: N/A Lead TOC: N/A Tail: Based on 150' Liner lap, 4132' 6 1/8" open hole and 30% excess + 80' shoe track. Tail TOC: 10864' MD I Total Cement Volume: ] LeadTail 10 bbls / 615 ft~ / 526 sks of Dowell Premium 'G' at 5.8 ppg and 1.16 cf/sk. Permit to Drill Page 3 Casinq/Tubinq Proqram: Hole Csg/ Wt/Ft Grade Conn Length Top // Btm Size Tbg O.D. MD/7~ MD/TVD 30" 20" 91.5# H-40 WLD ~145' ~ ~145'MD 13-1/2" 10-3/4" 45.5# L-80 BTC-M 4246' .,,/"GL 4246/4145 9-7/8" 7" 26# L-80 BTC-M 10983' .// GL 10983/8931 6 1/8" 4 Y2" 12.6# L-80 BTC-M 4266 /" 10864/8786 15116/9057 Tubing 4-1/2" 12.6# L-80 NSCT 5900./. GL 5900/5544 4 Y2" 12.6# 13Cr NSCT 49~3 5900 10864/8786 **Note: Cross-over to Chrome, NSCT tubing from/~)00 to packer depth! Cement Calculations: , Casing Size 110-3/4" Surface w/port collar ~000' for contingency 2na stage. I Basis: Lead: Based on 1910' of annulus in t,lYe permafrost @ 175% excess and open hole from top of tail slurry to base permafrost @30% excess, Lead TOC: To surface Tail: Based on 500' MD open ho~/e volume + 30% excess + 80' shoe track volume. Tail TOC: At -4700' MD (3100~/TVDbkb). ITotal Cement Volume: Lead/[' 537 bbl t ~015 ft3 / 679 sks of Dowell ARTICSET Lite 3 at 10.7 I /I PPg a.nd 4.44 cf/sk. I Ta)i'! 42 bbl/236 f¢ / 202 sks of Dowell Premium 'G' at 15.8 ppg I ,~! aqd 1.17 cf/sk. Casin~. Basis: Size 17" Intermedi Lead: N/A Lead TOC: N/A Casing Tail: Based on 1000' above TD and 30% excess + 80' shoe track volume. Tail TOC: 10! MD I Total Cement Lead Tail N/A 61 bbls / 344 lC/297 sks of Dowell Premium 'G' at 15.8 ppg and 1.16 cf/sk. Basis: 4 ~" Production Liner N/A TOC: N/A ail: Based on 150' Liner lap, 4132' 6 1/8" open hole and 30% excess + 80' shoe track. TOC: 10864' MD ement Volume: Lead Tail N/A 10 bbls / 615 ft~ / 526 sks of Dowell Premium 'G' at 5.8 ppg and 1.16 cf/sk. RECEIVED Permit to Drill JAN I 8 20nl Alaska Oil & Gas Cons. Commission Anchorage Page 3 Well Control: Surface hole will be drilled with diverter due to the depth of surface casing at a point greater than 3000' TVD. For intermediate hole drilling, well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon calculations below BOP equipment will be tested to 3500 psi Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Production Interval- · Maximum anticipated BHP: · Maximum surface pressure: 3600 psi @ 8800' TVDss -Ivishak Sands 2720 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: 3500 psi (required for casing test) · Planned completion fluid: 8.6 ppg seawater / 6.8 ppg Diesel Drilling Hazards/Contingencies: HYDROGEN SULFIDE- H2S ° DS-17 is designated as an H2S site, therefore ADW Standard Operating Procedures for H2S precautions should be followed at all times. The highest level of H2S recently measured on this pad in the last 12 months was on 17-11 (134 ppm in August 2000) Offset wells 17-14 & 17-13 registered 37 & 30 ppm respectively in Nov 2000. (all drillsites to FS2 are considered H2S sites). DRILLING & SURFACE CLOSE APPROACH: There are no drilling close approach issues identified in the downhol, directional, wellbore proximity analysis. All adjacent wellbores have passed major risk analysis. Well 17-13 maintains 29.8' ctr to ctr distance and 5' rig to wellhead separation. Well 17-14 maintains 65' ctr to ctr distance and 65' rig to wellhead separation. Disposal: No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for injection. Haul all Class I wastes to Pad 3 for disposal. RECEIVED JAN i 8 2001 Permit to Drill Page 4 Alaska Oil & Gas Cons. Commission Anchorage DRILL AND COMPLETE PROCEDURE SUMMARY i i i ii II i i iii I ii . ii i iii i [i i **~DEADHORSE AIRPORT NOTIFICATION REGIUIRED,. S.E.E. PAD DATA. SHEET.*.* Pre-Rig Work: The 20' conductor is pending installation. 1. Weld an FMC landing ring for the FMC wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. 3. Ensure any required plugs and / or well shut-ins have been accomplished in nearby wells for rig move and close approach concerns. Rig 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14, 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Permit to Drill Operations: MIRU Nabors 9ES. Nipple up diverter spool and dser. Function test same. PU 4" DP as required and stand back in derrick. MU 13 1/2" drilling assembly and drill surface hole to at least 20' into the most competent shale below the SVl sand. GRIDIR. Run and cement the 10 3/4", 45.5~ surface casing back to surface. Position a TAM port collar at :t:1000' as contingency in the event cement does no fully circulate to surface. ND diverter spool and riser and NU casing I tubing head. NU BOPE and test to 3500 psi(Notify AOGCC). Measure/record RF-FB & RF-GL distances. MU 9 718~ drilling assembly and RIH to float collar. Test the 10 3~4" casing to 3500 psi for 30 minutes. Drill out shoe joints and displace well to LSND drilling fluid, Drill new formation to 20' below casing shoe and perform a FiT to 12,5 ppg EMW. Calculate kick margin & notify Supt if less than 40 bbl. Drill 9 7~8" intermediate hole per directional plan to TSGR. GR/DIR. Make wiper trip with hole opener as hole conditions require. Run 7" 26~lft INTERMEDIATE casing to TD and cement in place, set on mandrel hanger. Displace cement with mud. Bump plug to 3500 psi, check floats. Land casing on mandrel hanger. Install and test pack-off to 5000 psi. WOC 12 hrs. Freeze protect 7" x 10-314" annulus with dead crude to 2000' 'I'VD by annular injection, a~ Test casing to 3500 psi. MU 6 118" drilling assembly and RIH to float collar. Test 7~ casing to 3500 psi for 30 mins, Drill out shoe joints and displace well to Iow density drilling fluid. Drill new formation to 20' below casing shoe and perform a FIT to 9.$ ppg EMW. Calculate kick margin and notify Supt if less than 40 bbl. Drill 6 1/8" production hole to program TD. Make wiper trip as hole conditions require and spot liner running pill across Open hole section. Run 4 %", 12.6#, L-80 liner to TD. Cement in place and hang-off on Baker ZXP/HMC liner top packer/hanger. Note: Asset team is requesting that a contingency "Banzai" liner plan be at the ready. Drop drill pipe dart & displace cement with perforating pill and seawater. Displace the well to clean seawater above the liner top. POOH wi liner running tool. Pick-up required length of 2 718" DP & perforate 4 %" using DP conveyed guns. Run 4-1/2", 12.6~ Chrome & L-80 tubing, packer, WLEG, profile nipples, GLM's, & SSSV(Xnipple). See attached completion schematic for details..Reverse circulate the well to clean, inhibited seawater, followed by sufficient diesel to freeze protect the tubing and annulus to 2100' after U- tubing. Install two-way check and test to 3500 psi. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Pull the TWC. U-tube the diesel to freeze protect tubing and annulus to 2100'. Drop setting ball and rod, set production packer and test tubing and annulus to 3500 psi. Install & test BPV. Secure the well and rig down / move off 9ES, ~ Job 1.: MIR,U Hazards and Contingencies > DS-17is designated as an H2S site Standard Operating Procedures for H2S precautions should be followed at all times. > Deadhorse Airport must be notified. See Pad Data Sheet for information. Reference RPs o:o "DdllingANorkover Close Proximity Surface and Subsurface Wells Procedure" Operational Specifics · Notify AOGCC 24 hours advance for BOP test witness. · Post drilling permit with summary of drilling hazards in doghouse and camp prior to spud. Job. 2: Dril. ling..Surface Hole Hazards and Contingencies > No fault crossings identified in the SOR. > Directional drilling KOP at 500' w/.5 to 2.5 deg DLS planned. Final angle 15 degrees. ;> Set surface casing just into the shale below of the SVl sand. >, Kick Tolerance: .Calculaton not relevant. Reference RPs ***o "Well Control Operations Station Bill" Operational Specifics · Drill bit 13 %" Run 1: Pending. · Drill bit 13 %" Run 2: Pending · 'BHA: See attached Sperry-Sun recommendation. · Refer to attached mud program for flow rate and other operational specifics and contingencies. · Directional strategy should consider the lesser efficient "drilling the line" and proximity issues of current and planned wells. Use best judgment to achieve both current well and long term development objectives. Minimize DLS. · Maintain the geologist on-site forthe entire surface hole and casing point determination. ..Job 3:,!nstall surface Casina Hazards and Contingencies > it is critical that cement is circulated to surface for welt integrity. 175% excess cement through the permafrost zone (and 30% excess below the permafrost) is planned. ~,,As a contingency, a port collar will be positioned at +_1000'MD to allow a secondary circulation and 2"° stage cement job as required. '- -- -- _.,-r-A_,A Permit to Drill Page 6 "Surface Casing Cementing Guidelines" "Surface Casing Port Collar Procedure" Operational Specifics · Have a port collar shifting tool installed on a stand of drill pipe in the derrick prior to cement job. · Verify that Dowell have on-hand +250 sacks of Arctic-Set Lite-3 lead cement in case the port collar contingency is required. · Ensure all casing joints and accessories drift to 9 7/8". · Make up casing as follows: o Halliburton float shoe o 2 joints of 10 3/4" 45.5# L-80 m-BTC casing o Halliburton float collar o 10 %" L-80 m-BTC casing as required to 1000' o 10 3~4" TAM port collar o 10 ~"" 40# L-80 m-BTC casing to surface(~1000') o FMC fluted mandrel hanger o 10 3/4" split joint (see TAM collar RP) · Centralizers: one bowspring type per joint first 15 joints, plus one each side of the port collar. · Pump cement as per recommended practice at volumes specified in attached cement program. J~b'4: Drilling Intermediat® ' Hazards and Contingencies Reference RPs o:o "Leak-Off and Formation Integrity Tests" o:o "Lubricants for Torque and Drag Management" Faults: None identified on the SOR or Technical Package. Produced water injection has over-pressured the,~,V3~zone to 9.0 . A float w/drilled pinhole must be run in all BHA's below surface caSing. Stuck pipe has occurred through the Kingak formation on past wells. Adequate mud weight and shale inhibition additives will minimize this hazard. Directional drillers will utilize up to 8 degree DLS to achieve final inclination of 48 deg. Kick Tolerance: 82 bbls kick when drilling at 7" shoe depth, taking an influx from a 9.5 ppg reservoir, assuming the weak point is at the surface casing shoe 4250' MD with a 12.5 ppg frac resistance. Geologist to determine intermediate, casing point in siltstone at base of Kingak. Operational Specifics · 9 7/8" bit: Pending Selection Permit to Drill Page 7 DRILL AND COMPLETE PROCEDURE SUMMARY **DEADHORSE AIRPORT NOTIFICATION REQUIRED, SEE PAD DATA SHEET** Pre-Rig Work: The 20" conductor is pending installation. 1. Weld an FMC landing ring for the FMC wellhead on the conductor. ,./ 2. If necessary, level the pad and prepare location for rig move. 3. Ensure any required plugs and / or well shut-ins have been ac(~°mplished in nearby wells for rig move and close approach concerns. Rig 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Operations: MIRU Nabors 9ES. Nipple up diverter spool (with blinded outlet) and riser. PU 4" DP as required and stand back in derrick. ...' MU 13 1/2" drilling assembly and drill surface hole to'at least 20' into the most competent shale below the SVl sand. GR/DIR. . Run and cement the 10 3/4", 45.5# surface ca,~ing back to surface. Position a TAM port collar at +1000' as contingency in the event cement doe~ no fully circulate to surface. ND diverter spool and riser and NU casing,"/tubing head. NU BOPE and test to 3500 psi(Notify AOGCC). Measure/record RF-FB & RF-GLdistances. MU 9 7/8" drilling assembly and RIH to flo, a/~ collar. Test the 10 3/4" casing to 3500 psi for 30 minutes. Drill out shoe joints and displace well CLSND drilling fluid. Drill new formation to 20' below casing shoe and perform a FIT to 12.5 ppg E N. Calculate kick margin & notify Supt if less than 40 bbl. Drill 9 7/8" intermediate hole per plan to TSGR. GR/DIR. Make wiper trip with hole opener as ~ole conditions require. Run 7" 26#/ft INTERMEDIATE c to TD and cement in place, set on mandrel hanger. Displace cement with mud. Bump plug psi, check floats. Land casing on mandrel hanger. Install and test pack-off to 5000 psi. WOC 12 hrs. Freeze protect 7" x 10-3/4" Jlus with dead crude to 2000' TVD by annular injection. Test casing to 3500 psi. MU 6 1/8" drilling assemb RIH to float collar. Test 7" casing to 3500 psi for 30 mins. Drill out shoe joints displace well to Iow density drilling fluid. Drill new formation to 20' below casing shoe and a FIT to 9.5 ppg EMW. Calculate kick margin and notify Supt if less than 40 bbl. Drill 6 1/8" prodl hole to program TD. Make wiper trip as h e conditions require and spot liner running pill across open hole section. Run 4 1/2", 12.6#, -80 liner to TD. Cement in place and hang-off on Baker ZXP/HMC liner top packer/hanger. Asset team is requesting that a contingency "Banzai" liner plan be at the ready. Drop drill pipe d & displace cement with perforating pill and seawater. Displace the well to clean seawater liner top. POOH w/liner running tool. Pick-up requir length of 2 7/8" DP & perforate 4 1/2" using DP conveyed guns. Run 4-1/2", See attach seawater, Install 5000 ps Pull the Drop Chrome & L-80 tubing, packer, WLEG, profile nipples, GLM's, & SSSV(Xnipple). completion schematic for details. Reverse circulate the well to clean, inhibited by sufficient diesel to freeze protect the tubing and annulus to 2100' after U-tubing. check and test to 3500 psi. Nipple down the BOPE. Nipple up and test the tree to diesel to freeze protect tubing and annulus to 2100'. ball and rod, set production packer and test tubing and annulus to 3500 psi. & test BPV. Secure the well and rig down / move off 9ES. RECEIVED Permit to Drill J/~N J. 8 2001 Alaska Oil & Gas Cons. Commission Anchorage Page 5 ~ DS-17is designated as an H2S site Standard Operating Procedures for H2S precautions should be followed at all times. ~- Deadhorse Airport must be notified. See Pad Data Sheet for information. Reference RPs o:o "DrillingNVorkover Close Proximity Surface and Subsurface Wells ProCedure" Job 1: MIRU Hazards and Contingencies Operational Specifics · Notify AOGCC 24 hours advance for BOP test witness. · Post drilling permit with summary of drilling hazards in'doghouse and camp prior to spud. Job 2: Drillin.q Surface Hole Hazards and Contingencies No fault crossings identified in the SOR'. Directional drilling KOP at 500' w/.5'to 2.5 deg DLS planned. Final angle 15 degrees. Produced water injection has over-pressured the SV3/Cretaceous zone to 9.0 EMW. Set surface casing just into the shale below of the SV1 sand. Kick Tolerance: Calculaton not relevant. Reference RPs · :, "Well Control OperationS Station Bill" // Operational Specifics / · Drill bit 13 1/2" Rur¥'l: Pending. JAN Commission / · ,,,,,,lura9e · BHA: Seea/ttached Sperry-Sun recommendation. / · Refer to at~ched mud program for flow rate and other operational specifics and continge/~ies. ,, ,, · Directi~hal strategy should consider the lesser efficient drilling the line and proximity issue~/of current and planned wells. Use best judgment to achieve both current well and/[bng term development objectives. Minimize DLS. ' 71tai,___ __n ~i..,i~iel°gist °n'site for the entire surface h°le and casing p°int determination' Job 3~_..tnstall surface Casinq Hazards and Contingencies ~ It is critical that cement is circulated to surface for well integrity. 175% excess cement through the permafrost zone (and 30% excess below the permafrost) is planned. As a contingency, a port collar will be positioned at _+1000'MD to allow a secondary circulation and 2n° stage cement job as required. Permit to Drill Page 6 Reference RPs · :- "Casing and Liner Running Procedure" · :- "Surface Casing Cementing Guidelines" · :. "Surface Casing Port Collar Procedure" Operational Specifics · Have a port collar shifting tool installed on a stand of~Clrill pipe in the derrick prior to cement job. ,.,' / · Verify that Dowell have on-hand +250 sacks of'"Arctic-Set Lite-3 lead cement in case the port collar contingency is required. · · Ensure all casing joints and accessories di'ift to 9 7/8". · Make up casing as follows: .' o Halliburton float shoe o 2 joints of 10 3/4" 45.5# L-80 m-BTC casing o Halliburton float collar o 10 3~,, L-80 moBTC casi0~ as required to 1000' o 10 3/4" TAM port collar,/ o 10 3,~'"' 40# L-80 m-B~/C casing to surface(-1000') o FMC fluted mandrel,hanger 10 3/4" split joint (s~e TAM collar RP) O Centralizers: one bows~i:ing type per joint first 15 joints, plus one each side of the port collar. / · Pump cement as per/recommended practice at volumes specified in attached cement program. / Job 4: Drillinc~ Hazards and Contim ~ Faults: None :lentified on the SOR or Technical Package. ~- A float w/dr pinhole must be run in all BHA's below surface casing. :> Stuck ~as occurred through the Kingak formation on past wells. Adequate mud weight ar shale inhibition additives will minimize this hazard. Kick PPg 12.~ G~ drillers will utilize up to 8 degree DLS to achieve final inclination of 48 deg. lerance: 82 bbls kick when drilling at 7" shoe depth, taking an influx from a 9.5 ,servoir, assuming the weak point is at the surface casing shoe 4250' MD with a :)pg frac resistance. ,Iogist to determine intermediate casing point in siltstone at base of Kingak. )ff and Formation Integrity Tests" "Lubricants for Torque and Drag Management" Permit to Drill RECEIVED JAN 1 8 2001 Alaska 0il & Gas Cons. Commission Anchorage Page 7 Operational Specifics · 9 7/8" bit: Pending Selection · Recommended BHA: See attached Sperry-Sun BHA recommendation. Job 6: Install Intermediate Casinq Hazards and Contingencies ~ Casing will be cemented 1000' over the shoe measured depth at interval TD. After freeze protecting the 7" x 10-3/4" casing annulus with dead crude, the hydrostatic pressure alone may be less than the formation pressure. Ensure a double-barrier at the surface on the annulus exists until the cement has set up for at least 12 hours. Expect trapped annulus pressure after pumping the dead crude. The surface casing point is chosen just below the SVlsands. Freeze protection of the 10 3~,, x 7" annulus will be accomplished via injection into the formations below (Ugnu & W est sak). Reference RPs *:o Production Interval Cementing" *:* "Freeze Protecting an Outer Annulus" Operational Specifics Run one short joint: Make up casing as follows: o Halliburton float shoe o 2 joints of 7" 29# L-80 m-BTC casing o Halliburton float collar o 7" 29# L-80 m-BTC casing with short joints to surface o FMC fluted mandrel hanger CentraliZation: straight-blade rigid centralizers alternating every joint from the shoe to 1000' above interval TD. Plan to set casing as close to bottom as possible with mandrel hanger. Tag TD before making up mandrel hanger on landing joint. Reciprocate if possible. If hole conditions are questionable, land the casing on the fluted mandrel hanger and continue the cement job without reciprocation. Note on Schlumberger's pump schedule to slow the displacement for the last 25 bbls to avoid excessive ECD. Job 7: Drillinq Horizontal Production Interval Hazards and Contingencies ~ Faults: Geology identifies two sealing faults in this horizontal section. Both are oriented N-S. The first fault is 5' downthrown to the east. Approximately 1400' to the ESE of the 1st fault the well will cross a 12' down to the west fault. RECEIVED Permit to Drill JAN -]- 8 Z 0 01 Page 8 Alaska Oil & Gas Cons. Commission Anchorage Kick Tolerance: Kick Tolerance: Infinite kick can be taken when drilling at TD, taking an influx from a 8 ppg reservoir, assuming the weak point is at the intermediate casing shoe 10983' MD with a 9.5 ppg frac resistance. :~ Casing point will be dictated as the reservoir pinches out. > A liner running pill should be spotted on the last TOOH. Reference RPs 4° "Leak-Off and Formation Integrity Tests" 4° "Lubricants for Torque and Drag Management" Operational Specifics · 6 1/8"bit: Pending Recommended BHA: See attached Sperry-Sun BHA recommendation. Job 9: Install Production Liner Hazards and Contingencies > Solid Casing will be cemented across the entire open hole interval unless a contingency decision to run a banzai slotted liner is made. Reference RPs 4° Production Interval Cementing" *:, "Freeze Protecting an Outer Annulus" Operational Specifics Run two short marker joints placed 100'MD above TSGR and across the 1st fault crossing. · Make up casing as follows: o Halliburton float shoe o 2 joints of 4 Y2", 12.6# L-80 m-BTC casing o Halliburton float collar o Landing collar(thread-lock all connections through LC) o 4 1/2,,# L-80 m-BTC casing as required for 150' liner over-lap. o HMC Hanger o ZXP Packer w/6 ' tie-back receptacle. o C2 setting/running tool. o 4" DP to surface · Centralization: One un-secured solid, straight blade centralizer every 30' across zones of production interest. Centralized one per joint otherwise. Centralizer on jt 1 should be locked down -5' from shoe. · Reciprocate if possible. Note on pump schedule to slow the displacement for the last 25 bbls to avoid excessive ECD. · Displace cement with perf pill and circulate clean seawater above liner top. RECEIVED Permit to Drill J A N .1. 8 Z 0 01 Page 9 Alaska Oil & Gas Cons. Commission Anchorage Job 10: DPC Perforatinq Hazards and Contingencies > No hazards specific to this well have been identified for this phase of the well construction. Reference RPs 4° Drill Pipe Conveyed Perforating Operational Specifics · 2 7/8" Drill Pipe Conveyed inside the 4 Y2" production liner. · Spot adequate column of diesel for 200 psi underbalance. · Halliburton 2 Y2" guns at 4 JSPF. Specific charge selection under evaluation by asset production engineer at this time. Perf interval pending geology & LWD analysis. Job 12: Run Completion Hazards and Contingencies > No hazards specific to this well have been identified for this phase of the well construction. Reference RPs 4° "Completion Design and Running" 4. "Freeze Protection of Inner Annulus" Operational Specifics · Position X nipple at 2000 TVDss in place of SSSV. · X nipple one joint above the production packer, and an X (3.813")nipple below the packer. Refer to completion schematic. · MD for GLMs for the TVDss is pending. Freeze protecting may be accomplished either via full circulation around packer or via the RP shear valve. GLM's positioned at the following TVD's 3500, 5000, 6000, 7000, 7850, & 8500 (+/-100') · Reverse circulate clean corrosion inhibited seawater. Drop ball/rod, set pkr, & tst tbg to 3500 psi. · Baker ZXP packer, HMC Hanger, C-2 setting tool. · Baker S-3 Production packer. Job 13: ND/NU/Release Riq Hazards and Contingencies > No hazards specific to this well have been identified for this phase of the well construction. RECEIVED JAN i 8 200t Permit to Drill Alaska Oil & Gas Cons, Commission Page 10 Anchorage Reference RPs & Operational Specifics 17-22 Ri.qsite Summary of Drilling Hazards POST THIS NOTICE IN THE DOGHOUSE v' Ensure Deadhorse Airport has been notified prior to MIRU. Surface Hole: Tight hole, torque, packing off, washing and reaming have been experienced. v' Intermediate Hole: Cretaceous over pressure has required 9.3 ppg mud. Coal at top of Ugnu has caused stuck pipe. Kingak has caused stuck pipe. Continue best practices for well control during drilling operations. Monitor for signs of a kick. After freeze protecting the 7" x 10 3/4" casing annulus with dead crude, the hydrostatic pressure alone may be less than the formation pressure. Expect trapped annulus pressure after pumping the dead crude. v,' Production Hole: Lost returns have been experienced on this drill- site. Two "sealing" faults oriented North to South will be crossed and are not expected to cause lost circulation. 1st fault 5' downthrown to the east. 2nd fault 12' downthrown to the west. Low density, solids free drilling fluid will be utilized. v' Pyrite concentrations at the top 10' of zone 4B should be avoided by geo-steering beneath. Lost returns in the Shublik have been encountered after intersecting a fault. Minimize chance of differential sticking by maintaining Iow density drilling fluid properties ¢' This pad is a designated H2S pad. Operating Procedures for H2S. Consult ADW Standard RECEIVED JAN 1 8 2001 Permit to Drill Page 11 Alaska Oil & Gas Cons. 0ommission Anchorage CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. TAM Port Collar and Combo Tool Running Procedure: Equipment: 10-PC-01:10 3,4" Port Collar, 45.5 ppf, L-80, BTC boxx pin, 12.75" OD, Shifts down to open and up to close. 10-CT-01:10 3A" Combo Tool w/4 Y2" IF Box by Pin. 4 Y2" Box x 2 7./8" EU Pin x-over 347-CH-01:3 Y~" choke sub, 2 7./8" EU Box by Pin w/insert for 1 1/8" setting ball, pinned w/6 shear pins @ 2040 psi. 288-BK-01:2 7/8" Ball Catcher w/2 7/8" EUE Box up. Pre Job Procedure: A. Upon arrival at the job site, check in at the rig & immediately check all tools on location against the shipping documents and check for shipping damage. B. Ensure that all TAM equip is compatible w/other equipment on location and that all handling tools are on location. C. Actively participate in pre-job planning meeting. Note that the casing must be landed on the mandrel hanger(not emergency slips) for this procedure to be valid w/out rigging up a false rotary table. D. For a landing tool w/LH Acme running threads, modify the landing joint to consist of a 24.5' lower section and a 10' top section w/a MBTC connection. When landed the top of the lower section will be above above the flowline but below the rotary slip bowl. This will allow cement returns(and any carried gravel) to pass directly to the flowline. E. Drift all crossovers and work string with a 1 1/8" steel ball. Running Procedure: 1. Make-up and run 10 3A,, float shoe and landing collar as required. 2. Run 10 3A" casing to desired port collar setting depth. Set casing as Iow as possible in slips to facilitate port collar make up. . RECEIVED Alaska 0il & Gas Cons. Commission Anchorage Permit to Drill Page 12 TREE: 4-1/16" o 5M CIW Carbon WELLHEAD: 13 5/8" - 5M FMC SH 17-22 Proposed Completion Cellar Elevation = Nabors 9ES RKB: 64.4 10-3/4", 45.5 #/ft, L-80, BTC 5900' 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 4-1/2" 12.6# L-80, Premium Threaded Tubing down to 5900' 9Cr Cross-over. J2000' [ 4-1/2" x 1" Camco 'KBG-2' Gas Lift Mandrels with handling pups installed. '--Mb ..... ! ~iZ'~ .... i Valve Type TBD 1" RP Shear TBD 1" DV TBD 1" DV TBD 1" DV TBD 1" DV TBD 1" DV 4-1/2" 12.6# 13 Chrome Premium Threaded Tubing, 5900 to liner top at -10833' RECEIVED JAN A/ ~.._.as,~ Oil & Gas Cons. 4-1/2" 'X' Landing Nipple with 3.813" seal bore. Commission 7"x 4-1/2" Baker 'S-3' Production Packer Anchorage 4-1/2" 'X' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID. 4-1/2" WireLine Entry Guide spaced-out into 4-1/2" liner tie-back sleeve. 7", 26 #/ft, L80, BTC-Mod 0,833' [ BAKER 5" x 7" Liner Tie Back Sleeve ZXP Liner Top Packer 'HMC' Hydraulic Liner Hanger 4-1/2" 12.6 #/ft, L-80, BTC-Mod Plug Back Depth 15,115'I 15,035' [ Date Rev By Comments 12/13/00 LRC Proposed Completion 1/14/01 SHS X Tbg Tail (not XN) Prudhoe Bay Unit WELL: 17-22 APl NO: 50-029-????? BP Alaska Drilling & Wells WELL # S-104i DATE:.. 1/16/01_;~ RT - BF 26.28 OLD RT TO BF CORRECTION 0 GROUND LEVEL TO BF NABORS 9ES 13 518 BOPE STACK WITH 2 SPOOLS (Grass Roots) ORT TO MSL: NtA 9ES RT - GL 28.38 9ES RT.. BF 26.28 5.00 3,72 4.70 4,88 1.80 1.05 2.28 2.~0 DRIP PAN HYDRIL TYPE "GK" SCREWED HEAD SIN H 67879 DOUBLE GATE DOUBLE STUDDED PIPE RAM var 3 112" x 6" 10" MPL#,C,7357 SiN D,.1,3700 10"MPL D-1370 . 13.2.33 .t BLIND SHEAR RAM 14 114" MPL 7807 1,4 II4"MPL B4332 '[_, SINGLE GATE DOUBLE STUDDED 10" MPL C.-2424 MUD CROSS f 11.04 .... I 15,12 [ 2.03 3.85 17.15 PiPE I~A.M var 2 7/8" x 5" SIN 167 10" MPL-0191 [~~"~ T'BG SPOOL. BASE FLANGE 3.00 2100 24.00 RECEIVED Alaska Oil & Gas Cons. Commission Anchorage 26.28 DRIL~N~ S ~R~IC~ S North Slope Alaska Alaska Drilling & Wells PBU_EOA DS 17 17-22 Wp04 DrillQuesf __ 2000 0 C) 0 Current Well Properties Well: Horizontal Coordinates: Ref. Global Coordinates: Ref. Structure Reference: Ref. Geographical Coordinates: RKB Elevation: Norlh Reference: Units: 5927614.78 N, 709365.00 E 1369.44 N, 994.36 E 70° 12' 19.8066" N, 211041, 16.9025" E 66.40ft above Mean Sea Level 66.40ft above Structure Reference True North Feet ~ 0.50°/100fl : S00.00fl MD, 5~O.(X~t TVD in Dir Pate ~ 1.00~/100ff : 700.~Off MD, 699.99fl TVD · 1.50~/10~t : 900.(X)ft MD, 899.86~t TVD : 1100.00ft MD, 1099.22~t TVD ~, 2.50°/10~t : 13~0.001t MD, 1297.23~ 3ryD Start Sail ~ 15.000~: 1500.(X~tMD, 1492.43~tTVD Dir ~ 5.0~'/10(X1 : 2100.00fl MD, 2071.88~ TVD 10 3/4' Casing 4246.43ft MD 4145.50ft TVD Be~in Oi' ~ 8.0ff'/l(X)fl : ,5~X).00fl MD, 4870.011t TVD End Di', S~art Sa~ ~ 48.20Z': 5411.62flMD,5218.63ft'lYD I I 0 20OO Scale: linch = 2000ft 10983.11ff MD Proposal Data for 17-22 Wp4 Vertical Origin: Well Horizontal Origin: Well Measurement Units: ft North Reference: True North Dogleg severity: Degrees per 100 feet Vertical Section ~.imuth: 117.083° Vertical Section Description:Well Vertical Section Origin: 0.00 N,0,00 E Measured Incl. Azim. Vertical Northlngs Eastlngs Vertical D_og!eg Depth Depth Section 7=22 0.00 0.000 1.588 0.00 0.00 N O. OO E 0.00 500.00 O.00O 1.588 500.00 0.00 N 0.00 E 0.00 0.00 700.00 1.000 85.000 699.99 0.15 N 1.74 E 1.48 0.50 900.00 3.000 85.000 899.86 0.76 N 8.69 E 7.39 1.00 1100.00 6.000 85.000 1099.22 2.13 N 24.32 E 20.69 1.50 1300.00 10.000 85.000 1297.23 4.55 N 52.05 E 44.27 2.00 1500.00 IS.(X}0 85.000 1492.43 8.32 N 95.15 E 80.93 2.50 2100.00 15.000 85.000 2071.98 21.86 N 249.86 E 212.51 0.00 2253.64 15.000 115.000 2220.61 15.18 N 287.74 E 249.28 5.00 4996.50 15.0(}0 115.000 4870.01 284.84 S 931.13 E 958.71 0.00 5411.62 48.210 115.098 5218.64 375.74 S 1125.43 E 1173.10 8.00 11003.67 48.210 115.098 8945.21 2144.25 S 4901.16 E 5339.97 0.00 11263.38 89.723 113.091 9036.40 2240.50 S 5117.86 E 5576.74 16.00 12297.36 89.723 113.091 9041.40 2646.02 $ 6068.99 E 6608.19 0.00 12348.28 89.187 119.178 9041.88 2668.44 S 6114.68 E 6659.08 12.(}O 13723.49 89.187 119.178 9061.40 3338.83 S 7315,26 E 8033.24 0.00 13764.64 91.217 122.758 9061.25 3360.00 S 7350.54 E 8074.28 10.O0 14463.86 91.217 122.758 9046.40 3738.26 S 7938.43 E 8769.92 0.00 14822.35 88.210 151.282 9048.23 3997.78 S 8180.29 E 9103.42 8.00 15115.87 88.210 151.282 9057.40 4255.07 S 8321.25 E 9346.06 0.00 I I I 4000 6000 8000 Section Azimuth: 117.083° (True North) Vertical Section DRAFT FOR PLANNING ONLY 15115.87ft MD 9057.40fl TVD I north s,op A,aa a PaU_£on os [DrillQuest' =-,LL,.=- s.nv,-=.. 17-22 Wp04 ~---~ Alaska Drillin~ & Wells Current Well Profiles Propel D~a for 17-22 W~ V~i ~: W~l W~l: 17-~ H~ ~in: Well H~z~I~ ~~: ~r~ U~: Ref. GI~ ~i~m ' 5~7614.78 N, 7093~.~ E N~ R~: True No~ Ref. Strum ~~: 1~9.~ N, 994.36 E Ref. G~~ ~inat~: 7~ 12' 19.8~" N, 211° 41' 16.9025" E ~l~: D~r~s per l~f~ V~ ~ ~im~: 117.~° V~ ~ D~: Well RKB Elev~i~: ~.~ ~ve ~n S~ Level v~ ~ ~in: o.~ N,0.~ E ~.~ ~ve Structure Referen~ M~ I~. ~m. Ve~l~ Nothings ~ln~ V~I~ N~h R~er~: T~ N~h ~ ~Dth ~ Units: F~t o.~ o.~ t.ss~ o.~ o.~ N 0.~ E 0.~ 7~.~ ].~ ~.~ 6~.~ 0.15 N 1,74 E 1.48 0.~ ~ ~.~ 3.~ 85.~ 8~.86 0.76 N 8.~) E 7.39 _~ ~ ]t~.~ 6.~ ~5.~ 1~.22 2.13 N 24.32 E 20,69 I.~ ~ ~- ~ _~ l~.~ 10.~ 85.~ 1297.23 4.55 N 52.05 E ~.27 2.~ _~n ~ ~ ~ !~.~ 15.~ 85.~ 1492.43 8.32 N 95.15 E 80.93 2.~ ~ 21.86 N ~ _ ~ ~' ~ ~3.~ 15.~ 115.~ 2220.61 15.18 N 287.74 E 249.28 5.~ I ~~' ~Y ~ 4~.~ ~5.~ HS.~ ~70.0~ 2~.84 S 93L~3 E 95~.7~ 0.~ ~ ~ ~ ~ ~ ~11.62 ~.210 115.~8 5218.~ 375.74 S 1125.43 E 1173.10 8.~ / ~'~ ~ _~- ~ 11~.67 ~.210 115.~8 8945.21 21~.25 S 4~1.16 E 5339.~ 0.~ : 10 ~ C~i~ ' ~ ~' _~ ~ ]~.~ ~.~ ~.~ ~.~ 22~.50 S 5117.86 E 5576.74 16.~ .... ~ .... ~_ ~' _~ ~ ~ !~.28 89.1~ 119.178 ~1.88 2~8.~ S 6114.68 E ~59.~ 12.~ 41~.~ ~D -~ ~ _~ ~ 137~.49 89.1~ 119.178 ~1.~ 3338.83 S 7315.26 E ~33.24 0.~ ~ ~ ~' ~ 137~ ~ 91 217 1~ 758 ~1.~ 3~.~ S 73~.54 E 8~4.28 10.{~ ~ ~ . . . ~~ ~' ~ 1~3.~ 91.217 1~.758 ~.~ 3738.26 S 7938.43 E 87~.~ 0.~ -] 000 -- ~-- e_~~ ~ ~ 1~.35 88.210 151.2~ ~8.23 3~7.78 S 8180.29 E 9103.42 8.~ ~-- ~ --~ ~ 15115.~ 88.210 151.282 ~57.~ 4255.~ S 8321.25 E 9~.~ 0.~ DRAFT FOR ' PLANNING ONLY , Z ~ ~g ~ ~ 7-22 7-2 Single Well Tarot Da~ for 17-~ ~' G ~ ~T~ P~ ~D~ No.hing. ~,n~ ~ ~in~ ~ln~ ~t ~%q~_~ ._~ II I 17-~ TI ~ Po~t 8~0.~ 5~5517.~ N 714543.~ E ~.~ 22~.~ S 5117.86 E Po~t ~- _ '~ -4000 ~ ~ 17-~ ~ ~ ~o~ ~5,~ 592~0.~ N 71~770.~ E ~1.~ Z~S.S~ S 7~5.2~ E ~o~t 4 1~" Liner , 17-~ T4 ~ Po~t 8980.~ 592~8.~ N 717~.~ E ~-~ 3738.26 S 7938.43 E Pokt ~57.4~ TVD o I/'-,72 i~1II. I I I I I I I I I 0 ~ 0~ 2000 8~0 4~ 5000 6000 7000 8000 8~le: 1 inch = 1 ~R Eastings Relerence is T~e No~h Sper, y-Sun Drilling vices Proposal Data - 17-22 - 17-22 Wp4 2 500.00! 500.001 0.000! 3' 700.00i 200.00i --i.000 4' I 900.001 200.00! 3.000 ~ [ 1T~.~I 200.00! "6.~ t6' 1000.00! 200.00f 10.000 ~7'~T~.ool 200.00l 15.000 , / (~) MD (fi) (°) (°) ........................ L ........ ~ ........... L .... ! (.) /iVD(.)l o.ooi .i o.ooo o.ooo ..... ~-.-0'~------~ o.oo o.~ ~:~~~ o.~ e5.~0[ 699.~ ~ 0.15 N a~ol ~97.~ ~.58. DoglegI Eastings(ff) -?-/1-'0~-~)-'i ToolfaCe(o) 0.00 0.00'. 0.000! 0.000 ._ 1.74E ___0_.500 85.000 8.69 E 1.000!0.000 24.32 E1.500i0.000 198.01l 52.05 E2.000 0.000 - i.~5:2°i 95.15 E2.500 0.000 8 2100.001 600.00I 15.000 85.000{ 2071.98t 579.56{ 21.86Ni 249.86Ef 0.000 0.000 104.511 ,' ~' ~-~_L~:~ ,~-0~ ',~.000I' .~0~'[ .... ~8.~[ ~.~8. ~,.,~ ~.ooo '-1-~'I ~,-~-~~2.86[ 15.000 115.0001 4870,011 .2649.40l. 284.84 931.13E 0.000 0.000 11 5411.62 415.12 48.210 115.098 5218.64 348.62 375.74S 1125.43E 8.000 0.133 !2 11003.67 5592.05 48.210 115.098 8945.21 3726.57 2144.25S 4901'16E 0.000 0:000 13T 11263.38 259i70 89.723 113.091 9036140 ::91,i9 2240.50S 5117.86 E 16.000 356'974 i 14Ti 12297.36[ 1033.98 89.7231 113.091i 9041.40 5~001 2646.02S 6068.99EI 0.0001 0.000! 15 12348.28 50.92 . 89.187 119.178 9041.88 0.48 2668.44 S 6114.68 E 12.000 95.057 16T : ;13723.49 1375:21 89.t87:119;178 9061.40:=;1;9,52:, 3338.83S 7315.26 E 0~000 : ,, , , ,, , , , ,; · , ,, ~,,, : , , ;19 14822.35 358.48 88.210 151.282 9048.23 1.83 3997.78S. 81.80.29E 8.000 '95.967: :20T: 15115.87 293.52 88.210 151.282 9057.40 9.17 4255.078 8321.25E 0.000 0.000 : , : 5 January, 2001 - 13:55 - 1 - DriilQuest Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Measured Oepth (ft) Sub-Sea Vertical Depth Depth (ft) (ft) 0.00 0.000 0.000 -66.40 0.00 100.00 0.OO0 0.000 33.60 100.00 200.00 0.000 0.000 133.60 200.00 300.QO 0.000 0.O00 233.60 300.00 400.00 0.000 0.000 333.60 400.00 500.00 0.000 0.000 433.60 500.00 600.00 0.500 85.000 533.60 600.00 700.00 1.000 85.000 633.59 699.99 800.00 2.(XX) 85.000 733.55 799.95 g00.00 3.000 85.000 833.46 899.86 1000.00 4.500 85.000 933.24 999.64 1100.00 6.000 85.000 1032.82 1099.22 1200.00 8.0(X) 85.000 1132.07 1198.47 1300.00 10.000 85.000 1230.83 1297.23 1400.00 12.500 85.000 1328.90 1395.30 1500.00 15.000 85.000 1426.03 1492.43 1600.00 15.000 85.000 1522.62 1589.02 1700.00 15.000 85.000 1619.21 1685.61 1800.00 15.000 85.000 1715.81 1782.21 1900.00 15.000 85.000 1812.40 1878.80 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (fi) 0.00 N 0.00 E 5927614.78 N 709365.00 E 0.00 N 0~= 5927614.78 N 709365.00 E 0.00 N ~~ ...... 5927614.78 N 709365.00 E 0.00 N ~~ 5927614.78 N 709365.00 E 0.00 N ~~ ~27614.78 N 709365.00 E ~0.~- -~- ~- ~E 5927614.78 N 709365.00 E -0~ ~_ 0.43 E 5927614.83 N 709365.43 E 0.~N~.._._~ ~-~- 1.74 E 5927614.98 N 709366.73 E 0.38 N 4.35 E 5927615.28 N 709369.33 E 0.76 N 8.69 E 5927615.78 N 709373.67 E 1.33N 15~1E 5927616.53N 709380.16 E 2.13 N 24.32E 5927617.58 N 709389.25 E 3.19 N 36.46 E 5927618.98 N 709401.36 E 4.55 N 52.05 E 5927620.77 N 709416.90 E RECEIVED 6.25 N 71.48E 5927623.01N 709436.28 E 8.32 N 95.15 E 5927625.74 N 709459.89 E 10.58 N 120.94 E 5927628.71 N 709485.60 E 12.84 N 146.72 E 5927631.68 N 709511.31 E 15.09 N 172.50 E 5927634.65 N 709537.02 E 17.35 N 198.29 E 5927637.62 N 709562.73 E JAN 1 8 2001 Dogleg Rate (°/100ft) 0.00 0.00 0.00 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 2.50 2.50 0.00 0.00 0.00 0.00 Alaska Drilling & Wells PBU_EOA DS 17 Vertical Section Comment 0.00 0.00 0.00 0.00 0.00 0.00 0.37 1.48 3.70 7.39 12.93 20.69 31.01 44.27 60.79 80.93 102.86 124.79 1 46.72 168.65 Begin Dir @ 0.50°/100ft · 500.0Oft MD, 500.00ft TVD Increase in Dir Rate @ 1.00°/10Oft · 700.00ft MD, 699.99ft I'VD Increase in Dir Rate @ 1.50°/100ft · 900.00ft MD, 899.86ft TVD Increase in Dir Rate @ 2.00°/100ft ' 1100.00ft MD, 1099.22ft TVD Increase in Dir Rate @ 2.50°/100fl ' 1300.00ft MD, ~-~.~ 1297.23fl TVD End Dir, Start Sail @ 15.0000 · 1500.00ftMD,1492.43ft'l'VD 5 January, 2001 - 13:53 Alaska Oil & Gas Cons. Commission Anchorage Page 1 ofll DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Sub-Sea Vertical Depth Depth (tt) (ft) 2000.00 15.000 85.000 1908.99 1975.39 2011.40 15.000 85.000 1920.00 1986.40 2100.00 15.000 85.000 2005.58 2071.98 2200.00 14.556 104.616 2102.34 2168.74 2253.64 15.000 115.000 2154.21 2220.61 Local Coordinates Northings Eastings (ft) (ft) 19.60 N 19.86 N 21.86 N 19.82 N Global Coordinates Northings Eastings (ft) (ft) 224.07 E 5927640.59 N 227__~1~ ~ 5927640.93 N 2~~: 5927643.56 N -~_ _- _~ _.~;9~E ~5927642.21 N '~-5927637.93 N 2300.00 15.000 115.000 2198.99 2265.39 "~ 1~ ~ --298.61 E 2400.00 15.000 115.000 2295.59 2361.99 ~;~. 0.~ S '~ 322.07 E 2500.00 15.000 115.000 2392.18 2458.58 ~~ S 345.53 E 2600.00 15.000 115.000 2488.77 2555.17 '%~_~.71 $ 368.98 E 2700.00 15.000 115.000 2585.36 2651.76 33.64 S 392.44 E 2800.00 15.000 115.000 2681.96 2748.36 2900.00 15.000 115.000 2778.55 2844.95 3000.00 15.000 115.000 2875.14 2941.54 3100.00 15.000 115.000 2971.73 3038.13 3200.00 15.000 115.000 3068.33 3134.73 3300.00 15.000 115.000 3164.92 3231.32 3400.00 15.000 115.000 3261.51 3327.91 3500.00 15.000 115.000 3358.10 3424.50 3600.00 15.000 115.000 3454.70 3521.10 3700.00 15.000 115.000 3551.29 3617.69 3800.00 15.000 115.000 3647.88 3714.28 3900.00 15.000 115.000 3744.47 3810.87 4000.03 15.000 115.000 3841.07 3907.47 4002.00 15.000 115.000 3843.00 3909.40 4100.00 15.000 115.000 3937.66 4004.06 5 January, 2001 - 13:53 RECEIVED JAN .l 8 ~001 Al~ka Oil & Gas Cons. Commiss/on Anchor~ 5927633.16 N 5927622.68 N 5927612.59 N 5927602.31 N 5927592.03 N 709588.44 E 709591.37 E 709614.15 E 709639.27 E 709652.21 E 709663.22 E 709686.97 E 709710.72 E 709734.47 E 709758.22 E 44.58 S 415.90 E 5927581.74 55.52 S 439.35 E 5927571.46 66.46 S 462.81 E 5927561.18 77.40 S 486.27 E 5927550.89 88.33 S 509.73 E 5927540.61 709781.97 709805.72 709829.48 709853.23 709876.98 99.27 S 533.18 E 5927530.32 110.21 S 556.64 E 5927520.04 121.15 S 580.10 E 5927509.76 132.09 S 603.55 E 5927499.47 143.03 S 627.01 E 5927489.19 709900.73 709924.48 709948.23 709971.98 709995.73 153.96 S 650.47 E 5927478.91 164.90 S 673.92 E 5927468.62 175.84 S 697.38 E 5927468.34 176.06 $ 697.85 E 5927458.13 186.78 S 720.84 E 5927448.05 710019.49 E 710043.24 E 710068.99 E 710067.46 E 710090.74 E Dogleg Rate (°/100ft) o.oo o.oo o.oo 5.00 5.00 o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo Alaska Drilling & Wells PBU_EOA DS 17 Vertical Section Comment 190.58 193.08 212.51 235.76 249.28 261.27 287.13 313.00 338.86 364.73 390.59 416.46 442.32 468.19 494.05 519.92 545.78 571.65 597.51 623.37 649.24 675.10 700.97 701.49 726.83 Base Permafrost Begin Dir @ 5,00°/100ft : 2100.00ff MD, 2071.98ft TVD End Dir, Start Sail @ 15.000° : 2253.64flMD,2220,61ftTVD SV2 Page 2 of 11 DrillQuest 2.00,06 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (fi) Vertical Depth (ft) 4200.00 15.000 115.000 4034.25 4100.65 4246.33 15.000 115.000 4079.00 4145.40 4246.43 15.000 115.000 4079.10 4145.50 4300.00 15.000 115.000 4130.84 4197.24 4400.00 15.000 115.000 4227.44 4293.84 4500.00 15.000 115.000 4324.03 4390.43 4600.00 15.000 115.000 4420.62 4487.02 4700.00 15.000 115.000 4517.21 4583.61 4800.00 15.000 115.000 4613.81 4680.21 4900.00 15.000 115.000 4710.40 4776.80 4984.46 15.000 115.000 4792.00 4658.40 4996.50 15.000 115.000 4803.61 4870.01 5000.00 15.280 115.002 4806.99 4873.39 5100.00 23.280 115.049 4901.31 4967.71 5200.00 31.280 115.072 4990.11 5056.51 5300.00 39.280 115.087 5071.68 5138.08 54(X).00 47.280 115.097 5144.42 5210.82 5411.62 48.210 115.098 5152.24 5218.64 5500.00 46.210 115.098 5211.13 5600.00 48.210 115.098 5277.77 5700.00 48.210 115.098 5344.41 5800.00 48.210 115.098 5411.05 5900.00 48.210 115.098 5477.69 6000.00 48.210 115.098 5544.33 6100.00 48.210 115.098 5610.97 Local Coordinates Northings Eastings (ft) (ft) 197.72 S 2O2.78 S 202.80 S 208.65 S 219.59 S ~~ ~:12 E ~__ 25~ ~ ~-~861.58 E '~-~_~___ 263..~ S - ~ 885.04 E ~___~ S 908.49 E _ 283.52 S 928.31 E 284.84 S 931.13 E Global Coordinates Northings Eastings (ft) (ft) 744,30 E 5927437,77 N 755~1~_~ 5927433,01 N 7~9~ 5927433,00 N 7~E:__.. _.. ~-. 5927427,49 N ._~_ ~'I:~E ~-~-_~-~927417,20 N 5927406,92 N 5927396,63 N 5927386,35 N 5927376,07 N 5927365,78 N 5927357,10 N 5927355,86 N 285.23 S 931.96 E 299.18 S 961.85 E 318.58 S 1003.34 E 710114.49 E 710125.49 E 710125.52 E 710138.24 E 710161.99 E 710185.74 E 710209.49 E 710233.25 E 710257.00 E 710280.75 E 710300.81 E 710303.67 E 5927355.5O N 5927342.37 N 5927324.13 N 710304.51 E 710334.78 E 710376.78 E 343.05 S 1055.61 E 5927301.13 N 710429.71 E 372.09 S 1117.64 E 5927273.81 N 710492.53 E 375.74 S 1125.43 E 5927270.38 N 710500.42 E 5277.53 403.69 S 5344.17 435.32 S 1185.10 E 5927244.09 N 710560.84 E 1252.62 E 5927214.35 N 710629.21 E 5410.81 466.94 S 1320.14 E 5927184.61 N 710697.58 E 5477.45 498.57 $ 1387.66 E 5927154.87 N 710765.95 E 5544.09 530.19 S 1455.18 E 5927125.12 N 710834.32 E 5610.73 561.82 $ 1522.70 E 5927095.38 N 710902.69 E 5677.37 593.45 S 1590.22 E 5927065.64 N 710971.06 E Dogleg Rate (°/lOOft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 8.00 8.00 8.00 8.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Alaska Drilling & Wells PBU_EOA DS 17 Vertical Section Comment 752.70 764.68 SV1 764.71 lO 3/4" Casing 778.56 604.43 830.29 856.16 882.02 907.89 933.75 955.60 958.71 959.63 992.60 1038.36 1096.04 1164.50 1173.10 1238.95 1313.46 1387.98 1462.49 1537.01 1611.52 1686.04 UG4/K15 cl Begin Dir @ 8.00°/100ft · 5000.OOft MD, 4870.01ft TVD End Dir, Start Sail @ 48.202° · 5411.62ftMD,521 8.63ftTVD RECEIVED JAN 1 8 ZOO1 5 January, 2001 - 13:53 Alaska 0il & Gas Cons. Commission Page 3 of 11 Anchorage DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Measured Depth (~t) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (fi) (ft) (ft) 6200.00 48.210 115.098 5677.61 5744.01 6300.00 48.210 115.098 5744.25 5810.65 6323.63 48.210 115.098 5760.00 5826.40 6400.00 48.210 115.098 5810.90 5877.30 6500.00 48.210 115.098 5877.54 5943.94 66(X).00 48.210 115.098 5944.18 6010.56 6700.00 48.210 115.098 6010.82 6077.22 6800.00 48.210 115.098 6077,46 61 48.86 6900.00 48.210 115.098 61 44.10 6210.50 7000.00 48.210 115.098 6210.74 6277.14 7100.00 48.210 115.098 6277.38 6343.78 7200.00 48.210 115.098 6344.02 6410.42 7300.00 48.210 115.098 6410.66 6477.06 7400.00 48.210 115.098 6477.30 6543.70 7473.08 48.210 115.098 6526.00 6592.40 7500.00 48.210 115.098 6543.94 6610.34 7600.00 48.210 115.098 6610.58 6676.98 7700.00 48.210 115.098 6677.22 6743.62 7800.00 48.210 115.098 6743.86 6810.26 7857.23 48.210 115.098 6782.00 6848.40 7900.00 48.210 115.098 6810.50 6876.90 8000.00 48.210 115.098 6877.14 6943.54 8100.00 48.210 115.098 6943.78 7010.18 8200.00 48.210 115.098 7010.42 7076.82 8300.00 48.210 115.098 7077.06 71 43.46 8400.00 48.210 115.098 71 43.70 7210.10 8500.00 48.210 115.098 7210.34 7276.74 8600.00 48.210 115.098 7276.99 7343.39 8700.00 48.210 115.098 7343.63 7410.03 8800.00 48.210 115.098 7410.27 7476.67 625.07 S 1657.74 E 5927035.90 N 656.70 S 1725.2~ .. 5927006.16 N 664.17 S 17~1_ ~ 5926999.13 N 688.32 S 17~~_ 5926976.42 N 719.95 S ~~E ~,926946.67 N _:Z~57._ .5~ ~~2~ 5926916.93 N ~~0~ ~:34 E 5926887.19 N 81~ ~- 2062.86 E 5926857.45 N ~_~846.~S ~' 2130.38 E 5926827.71 N ~~ S 2197.90 E 5926797.97 N 909.70 S 2265.42 E 5926768.22 N 941.32 S 2332.94 E 5926738.48 N 972.95 $ 2400.46 E 5926708.74 N 004.58 S 2467.98 E 5926679.00 N 027.69 S 2517.32 E 5926657.26 N 711039.43 E 711107.80 E 711123.95 E 711176.17 E 711244.54 E 711312.91 E 711381.28 E 711449.65 E 711518.02 E 711586.39 E 711654.76 E 711723.13 E 711791.50 E 711859.87 E 711909.84 E 1036.20 S 2535.49 E 5926649.26 N 711928.24 E 1 087.83 S 2603.01 E 5926619.52 N 711996.61 E 1099.45 S 2670.53 E 5926589.77 N 712064.98 E 1131.08 S 2738.05 E 5926560.03 N 712133.35 E 1149.18 $ 2776.69 E 5926543.01 N 712172.48 E 1162.70 S 2805.57 E 5926530.29 N 712201.72 E 1194.33 S 2873.09 E 5926500.55 N 712270.09 E 1225.95 $ 2940.61 E 5926470.81 N 712338.46 E 1257.58 S 3008.13 E 5926441.07 N 712406.83 E 1289.20 S 3075.65 E 5926411.32 N 712475.20 E 1320.63 S 3143.17 E 5926381.58 N 712543.57 E 1352.45 S 3210.69 E 5926351.84 N 712611.94 E 1384.08 S 3278.21 E 5926322.10 N 712680.31 E 1415.70 S 3345.73 E 5926292.36 N 712748.68 E 1447.33 S 3413.25 E 5926262.62 N 712817.05 E Dogleg Rate (°/10Oft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Alaska Drilling & Wells PBU_EOA DS 17 Vertical Section Comment 1760.55 1 635.06 1852.67 UGI/UgS 1909.58 1984.09 2056.61 2133.12 2207.64 2282.15 2356.66 2431.1 8 2505.69 2580.21 2654.72 2709.18 WSl/West Sak 2729.24 28O3.75 2878.26 2952.78 2995.42 3027.29 3101.81 3176.32 3250.64 3325.35 3399.86 3474.38 3548.89 3623.41 3697.92 CM3/K12 5 January, 2001 - 13:53 Page 4 of 11 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 8900.00 48.210 115.098 7476.91 7543.31 9000.00 48.210 115.098 7543.55 7609.95 9100.00 48.210 115.098 7610.19 7676.59 9200.00 48.210 115.098 7676.83 7743.23 9300.00 48.210 115.098 7743.47 7809.87 9400.00 48.210 115.098 7810.11 7876.51 9500.00 48.210 115.098 7876.75 7943.15 9600.00 48.210 115.098 7943.39 8009.79 9700.00 48.210 115.098 8010.03 8076.43 9800.00 48.210 115.098 8076.67 8143.07 9900.00 48.210 115.098 81 43.31 8209.71 10000.00 48.210 115.098 8209.95 8276.35 10100.00 48.210 115.098 8276.59 8342.99 10200.00 48.210 115.098 8343.23 8409.63 10300.00 48.210 115.098 8409.87 8476.27 10400.00 48.210 115.098 8476.51 8542.91 10432.24 48.210 115.098 8498.00 8564.40 10500.00 48.210 115.098 8543.15 8609.55 10600.00 48.210 115.098 8609.79 8676.19 10700.00 48.210 115.098 8676.44 8742.84 10706.85 48.210 115.098 8681.00 8747.40 10739.86 48.210 115.098 8703.00 8769.40 10800.00 48.210 115.098 8743.08 8809.48 10900.00 48.210 115.098 8809.72 8876.12 10970.95 48.210 115.098 8857.00 8923.40 10983.11 48.210 115.098 8865.10 8931.50 11000.00 48.210 115.098 8876.36 8942.76 11003.67 48.210 115.098 8878.81 8945.21 11006.98 48.739 115.061 8881.00 8947.40 11100.00 63.604 114.201 8932.64 8999.04 Local Coordinates Northings Eastings (ft) (ft) Global Coordinates Northings Eastings (ft) (~t) 1478.96 $ 1510.58 S 1542.21 S 1573.83 S 1605.46 S 170~ ~ ~ 3-~53.40 E ~] 731.~s -? 4020.92 E S 1795.21 S 4155.96 E 1826.63 S 4223.48 E 1858.46 S 4291.00 E 1890.08 S 4358.52 E 1921.71 S 4426.04 E 3480.77 E 5926232.87 N 3548.2~ ~ 5926203.13 N 361;~j~- 5926173.39 N 8688~8~E~_ 5926143.65 N 'c ~-' ~: :- --~ _.- 37~50;'~E -:~:~926113.91 N ~.~..- ~-~.'~:::. ~ '~ 5926084.17 N 5926054.42 N 5926O24.68 N 5925994.94 N 4088.44 E 5925965.20 N 5925935.46 N 5925905.72 N 5925875.97 N 5925846.23 N 5925816.49 N 712885.42 E 712953.79 E 713022.17 E 713090.54 E 713158.91 E 713227.28 E 713295.65 E 713364.02 E 713432.39 E 713500.76 E 713569.13 E 713637.50 E 713705.87 E 713774.24 E 713842.61 E 1953.34 S 4493.56 E 5925786.75 N 713910.98 E 1963.53 S 4515.33 E 5925777.16 N 713933.02 E 1984.96 S 4561.08 E 5925757.01 N 713979.35 E 2016.59 S 4628.60 E 5925727.27 N 714047.72 E 2048.21 S 4696.12 E 5925697.52 N 714116.09 E 2050.38 S 4700.74 E 5925695.49 N 714120.77 E 2060.82 S 4723.03 E 5925685.67 N 714143.34 E 2079.84 S 4763.64 E 5925667.78 N 714164.46 E 2111.46 S 4831.1 6 E 5925638.04 N 714252.83 E 2133.90 S 4879.07 E 5925616.94 N 714301.34 E 2137.75 S 4887.27 E 5925613.32 N 714309.65 E 2143.09 S 4898.68 E 5925608.30 N 714321.20 E 2144.25 S 4901.16 E 5925607.21 N 71 4323.71 E 2145.30 S 4903.40 E 5925606.22 N 714325.98 E 2177.37 S 4973.46 E 5925576.11 N 714396.91 E Dogleg Rate (,,/~ooft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 16.00 Alaska Drilling & Wells PBU_EOA DS 17 Vertical Section Comment 3772.44 3846.95 3921.46 3995.98 4070.49 4145.Ol 4219.52 4294.03 4368.55 4443.06 4517.58 4592.09 4666.61 4741.1 2 4815.63 469o.15 4914.17 4964.66 5o39.18 5113.69 5118.8o 5143.4o 5188.21 5262.72 5315.59 5324.65 5337.23 5,339.97 5342.45 5419.43 z THrz LCU Top Kingak/JB Sag River 7" Casing Begin Dir @ 16.00°/100ft 11003.67ft MD, 8945.20ft TVD Shublik 5 January, 2001 - 13:53 Page 5 of 11 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Alaska Drilling & Wells PBU_EOA DS 17 Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 11144.80 70.766 113.868 8950.90 9016.40 11200.90 79.590 113.495 8964.11 9030.51 11263.38 89.723 113.091 8970.00 9036.40 Local Coordinates Northings Eastings (ft) (ft) 2194.17 S 2215.58 S 2240.50 S Global Coordinates Northings Eastings (ft) (ft) 5011.16 E 5925560.35 N 5059~98~-'~ _ 5925540.30 N 51~~ 5925517.00 N ~1.55 E 11500.00 89.723 113.091 8971.14 9037.54 ~.30 S 5335.52 E 11600.00 89.723 113.091 8971.63 9038.03 2372.52 S 5427.51 E 11700.00 89.723 113.091 8972.11 9038.51 2411.74 S 5519.50 E 11800.00 89.723 113.091 8972.59 9038.99 2450.96 S 5611.49 E 11900.90 89.723 113.091 8973.08 9039.48 2490.18 S 5703.47 E 12000.90 89.723 113.091 8973.56 9039.96 12190.00 89.723 113.091 8974.05 9040.45 12200.00 89.723 113.091 8974.53 9040.93 12297.36 89.723 113.091 8975.90 9041.40 12300.00 89.695 113.407 8975.01 9041.41 12348.28 89.187 119.178 8975.48 9041.88 12400.00 89.187 119.178 8976.22 9042.62 12500.00 89.187 119.178 8977.64 9044.04 12600.00 89.187 119.178 8979.06 9045.46 12790.00 89.187 119.178 8980.48 9046.88 5925503.58N 5925466.92 N 5925430.27 N 5925393.61N 5925356.96 N 5925320.30 N 5925283.65 N 714435.05 E 714484.45 E 714543.90 E 714577.07 E 714670.11 E 714763.15 E 714856.19 E 714949.23 E 71 5042.27 E 715135.30 E 2529.40 S 5795.46 E 5925246.99 N 715228.34 E 2568.62 S 5887.45 E 5925210.34 N 715321.38 E 2907.84 S 5979.43 E 5925173.69 N 715414.42 E 2646.02 S 6068.99 E 5925138.00 N 715505.00 E 2647.06 S 6071.42 E 5925137.02 N 715507.46 E 2668.44 S 6114.68 E 5925116.86 N 715551.29 E 2693.65 S 6159.83 E 5925092.90N 715597.13 E 2742.40S 6247.14 E 5925046.59 N 715685.75 E 2791.15 S 6334.44E 5925000.28 N 715774.37E 2639.90S 6421.74E 5924953.98 N 715862.99E RECEIVED Dogleg Rate (°/100fi) 16.00 16.0o 16.0o o.00 0.00 o.0o 0.00 0.00 o.00 0.00 0.00 o.00 o.00 o.00 12.o0 12.00 o.00 0.00 0.0o 0.00 Vertical Section Comment 5460.64 5513.85 5576.74 5613.27 5713.02 5812.78 5912.54 6o12.29 6112.05 6211.81 6311.56 6411.32 6511.07 6608.19 6610.83 6659.08 6710.76 681o.69 6910.61 7010.53 Top Sadlerochit End Dir, Start Sail @ 89.723° 11263.38flMD,9036.490ftTV D Target - 17-22 T1, Current Target Begin Dir @ 12.00°/100fi 12297.36ft MD, 9041.40ft TVD Target - 17-22 T2, Current Target End Dir, Start Sail @ 89.187° : 12348.28ftM D,9041.88ftTVD 5 January, 2001 - 13:53 Page 6 of 11 JAN i 8, "~'" ~.UU'~ Alaska Oil & Gas Cons, Commission Anchorage DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (it) 12800.00 89.187 119.178 8981.90 9048.30 12900.00 89.187 119.178 8983.31 9049.71 13000.00 89.187 119.178 8984.73 9051.13 13100.00 89.187 119.178 8986.15 9052.55 13200.00 89.187 119.178 8987.57 9053.97 13300.00 89.187 119.178 8988.99 9055.39 13400.00 89.187 119.178 8990.41 9056.81 13500.00 89.187 119.178 8991.83 9058.23 13600.00 89.187 119.178 8993.25 9059.65 13700.00 89.187 119.178 8994.67 9061.07 13723.49 89.187 119.178 8995.00 9061.40 13764.64 91.217 122.758 8994.85 9061.25 13800.00 91.217 122.758 8994.10 9060.50 13900.00 91.217 122.758 8991.98 9058.38 14000.00 91.217 122.758 8989.85 9056.25 14100.00 91.217 122.758 8987.73 9054.13 14200.00 91.217 122.758 8985~1 9052~1 14300.00 91.217 122.758 8983.48 9049.88 14400.00 91.217 122.758 8981.36 9047.76 14463.86 91.217 122.758 8980.00 9046.40 Local Coordinates Northings Eastings (ft) Ct) Global Coordinates Northings Eastings (it) (it) 2888.64 S 6509.04 E 5924907.67 2937.39 S 6596,~ 5924861.36 2986.14 S 66~~= 5924815.05 3034.89 S 677_'_'0.i~-~. 5924768.74 3083.64 S ..... :~:~2~ '~-~_924722.43 ~ ~i~:'-:~'---,'-¥~'.~ ...... ~ -.~ _~__ _~32.3~? ~ :i:.~:_;~)~5~ 5924676.12 ~~_ ~:':~.7._-.~2:85 E 5924829.81 3338.83 S 7315.26 E 5924480.00 Dogleg Rate (°/10Oft) N 715951.61 E 0.00 N 716040.23 E 0.00 N 716128.85 E 0.00 N 716217.47 E 0.00 N 716306.09 E 0.00 N 716394.71 E 0.00 N 716483.33 E 0.00 N 716571.94 E 0.00 N 716660.56 E 0.00 N 716749.18 E 0.00 N 716770.00 E 0.00 3360.00S 7350.54E 5924459.82 N 716805.85 E 10.00 3379.13 S 7380.27 E 5924441.52 N 716836.10 E 0.00 3433.22 S 7464.35 E 5924389.77 N 716921.64 E 0.00 3487.32 S 7548.43 E 5924338.03 N 717007.19 E 0.00 3541.42S 7632.50E 5924286.28 N 717092.73E 0.00 3595.51 S 7716.58E 5924234.54N 717178.28 E 0~0 3649.61S 7800.68E 5924182.79 N 717263.82 E 0.00 3703.71 S 7864.74 E 5924131.05 N 717349.37 E 0.00 3738.26 S 7938.43E 5924098.00N 717404.00E 0.00 RECEIVED JAN 1 8 2001 Alaska Drilling & Wells PBU_EOA DS 17 Vertical Section Comment 7110.46 7210.38 731o.30 741o.23 7510.15 7610.07 7709.99 7809.92 7909.84 80o9.76 8033.24 8074.28 8109.46 8208.95 8308.44 84o7.92 85o7.41 8606.90 8706.39 8769.92 Begin Dir @ 10.00°/100ft : 13723.49ft MD, 9061.40ft TVD Target - 17-22 T3, Current Target End Dir, Start Sail @ 91.217° : 13764.64ftMD,9061.25ft'l'VD Begin Dir @ 8.00°/100ft : 14463.86ft MD, 9046.40ft TVD Target - 17-22 T4, Current Target Alaska Oil & Gas Cons. Commission Anchorage DrillQues t 2. 00. 06 5 January, 2001 - 13:53 Page 7 of 11 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 14500.00 90.915 125.633 8979.33 9045.73 14600.00 90.070 133.589 8978.47 9044.87 14700.00 89.224 141.544 8979.08 9045.48 1 4800.00 88.392 149.503 8981.17 9047.57 1 4822.35 88.210 151.282 8981.83 9048.23 14900.00 88.210 151.282 8984.26 9050.66 15000.00 88.210 151.282 8987.38 9053.78 15100.00 88.210 151.282 8990.50 9056.90 15115.87 88.210 151.282 8991.00 9057.40 Local Coordinates Northings Eastings (ft) (~t) Global Coordinates Northings Eastings (ft) (ft) 3758.56 S 7968.31 E 5924078.53 N 3822.26 S 8045,29~. 5924016.99 N 3896.01S 811.~17~ 5923945.14N 3978.36 S 8169~25E~ 5923864.39 N ¥_.-_..~ ~- ~ -~.~ 3997.78 S .~-.8-!_80;2~E ~59_ 23845.28 N ~__ _ .... -_~ ._; .~ - ~- 406~ ~ '8217.58 E 5923778.27 N ~153.~ S '~= 8265.61 E 5923691.98 N ~6 S 8313.63 E 5923605.69 N ~.07 S 8321.25 E 5923592.00 N 717434.43 E 717513.14 E 717582.58 E 717641.39 E 717652.96 E 717692.12 E 717742.56 E 717793.00 E 717801.00 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well and calculated along an Azimuth of 11 7.083° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 15115.87ft., The Bottom Hole Displacement is 9346.06ft., in the Direction of 117.083° (True). Dogleg Rate (°/100fl) 8.00 8.00 8.00 8.00 8.00 O.OO O.OO O.OO O.OO Alaska Drilling & Wells PBU_EOA DS 17 Vertical Section Comment 6805.77 89o3.31 8996.91 9084.75 9103.42 9167.61 9250.28 9332.95 9348.06 End Dir, Start Sail @ 68.210° , 14822.35ftM D,9048,23ft'I'VD 4 1/2" Liner Target - 17-22 BHL, Current Target RECEIVED J/ N 1 8 2001 A/aska Oil & Gas Cons. Commission Anchorage 5 January, 2001 - 13:53 Page 8 of 11 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Alaska Drilling & Wells PBU_EOA DS 17 Comments Measured Depth (ft) 500.00 700.00 900.00 1100.00 1300.00 1500.00 2100.00 2253.64 4996.50 5411.62 11003.67 11263.38 12297.36 12348.28 13723.49 13764.64 14463.86 14822.35 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 500.00 0.00N 0.00 699.99 0.15 N 1.74 899.86 0.76N 8.69 1099.22 2.13 N 24.32 1297.23 4.55 N 52.05 1492.43 8.32 N 95.15 2071.98 21.86N 249.86 2220.61 15.18 N 287.74 4870.01 284.84S 931.13 5218.63 375.74 S 1125.43 Comment E Begin Dir @ ~~~ 500..00ft MD, 500.00ff 'I'VD E .~!~crease_~_l ~/100ft · 700.00ft MD, 699.99ft TVD E~¥~::~!~i~l~_'.r~ Dir~l___ .50°/100ft - 900.0Oft MD, e99.86ft TVD E~-~.' Inc-~e~e~irl:~t-e @ 2.00o/100ff · 1100.00ftMD, 1099.22ftTVD E ~iiii~.. Incr~e i~ir Rate @ 2.50°/100ft · 1300.00ft MD, 1297.23ftTVD E "'~.~"Dir, Start Sail @ 15.000° · 1500.00ftMD,1492.43ftTVD E Begin Dir @ 5.00°/100ft : 2100.00ft MD, 2071.98ft TVD E End Dir, Start Sail @ 15.000° · 2253.64ftMD,2220.61ftTVD E Begin Dir @ 8.00°/100fl · 5000.00ft MD, 4870.01ft TVD E End Dir, Start Sail @ 48.202° · 5411.62ftMD,5218.63ftTVD 8945.20 2144.25 S 4901.16 E 9036.40 2240.50 S 5117.86 E 9041.40 2646.02 S 6068.99 E 9041.88 2668.44 S 6114.68 E 9061.40 3338.83 S 7315.26 E 9061.25 3360.00 S 7350.54 E 9046.40 3738.25 S 7938.43 E 9048.23 3997.78 S 8180.29 E Begin Dir @ 16.00°/100ft : 11003.67ftMD, 8945.20ftTVD End Dir, Start Sail @ 89.723°: 11263.38ftMD,9036.400ftTVD Begin Dir @ 12.00°/100ft : 12297.36ft MD, 9041.4Oft TVD End Dir, Start Sail @ 89.187°: 12348.28ftMD,9041.88ftTVD Begin Dir @ 10.00°/100fl : 13723.49ft MD, 9061.40ft TVD End Dir, Start Sail @ 91.21 7° · 13764.64ftMD,9061.25ft'l'VD Begin Dir @ 8.00°/100ft · 14463.86ftMD, 9046.40ftTVD End Dir, Start Sail @ 88.210° · 14822.35ftMD,9048.23ftTVD RECEIVED JAN 1 8 001 Alaska @'1 & Gas Cons. Commissio~ Anchorage 5 January, 2001 - 13:53 Page 9 of 11 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Alaska Drilling & Wells PBU_EOA DS 17 Formation Tops Measured Vertical Sub-Sea Depth Depth Depth Northings (~) (~) (~) (~) 2011.40 4002.00 4246.33 4984.48 6323.63 1986.40 1920.00 19.86 N 3909.40 3843.00 176.06 S 4145.40 4079.00 202.78 S 4858.40 4792.00 283.52 S 5826.40 5760.00 664.17 S 6592.40 6526.00 1027.69 S 6848.40 6782.00 1149.18 S 8564.40 6498.00 1963.53 S 8747.40 8681.00 2050.38 S 8769.40 8703.00 2060.82 S 7473.08 7857.23 10432.24 10706.85 10739.86 10970.95 8923.40 8857.00 2133.90 S 11006.98 8947.40 8881.00 2145.30 S 11144.80 9016.40 8950.00 2194.17 S Eastings (ft) 227.01 E 697.8_.5_..._ 755~-:f6~?::~ ~00 ~__~ 1741~;21 E 1:-'..~0.O{~10 1.588 ~ ~..~;-.. ..?_.-!.-.;~ ?- -:...~.. ~ .:.' :..._--.- 2517.3~E;: 0.000 1.588 2776.69 E 0.000 1.588 4515,33 E 0.000 1.588 4700.74 E 0.000 1.588 4723.03 E 0.000 1.588 Dip Dip~r.~rmation Name 0.~~~ Ba~gPermafrost SV1 UG4/K15 Cl UG1/UgS WSIANest Sak CM3/K12 THrz LCU Top Kingak/JB 4879.07 E 0.000 1.588 4903.40 E 0.000 1.588 5011.1 6 E 0.000 1.588 Sag River Shublik Top Sac~erochit Casing details From To Measured Vertical Measured Vertical Depth Depth Depth Depth (fi) (ft) (ft) (ft) Casing Detail <Surface> <Surface> 4246.43 4145.50 10 3/4" Casing <Surface> <Surface> 10983.11 8931.50 7" Casing <Surface> <Surface> 15115.87 9057.40 4 1/2" Liner RECEIVED JAN Alaska Oil & Gas Cons, Commission Anchorage 5 January, 2001 - 13:53 Page 10 of 11 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for 17-22 Wp4 North Slope Alaska Alaska Drilling & Wells PBU_EOA DS 17 Targets associated with this wellpath Target Name 17-22 BHL 17-22 T1 17-22 T2 17-22 T3 17-22 T4 Target -- Mean~ Lev~~ Coordinates: ~~hical Coordinates: Mean Sea Level/Global Coordinates: Geographical Coordinates: Mean Sea Level/Global Coordinates: Geographical Coordinates: Mean Sea Level/Global Coordinates: Geographical Coordinates: Entry Coordinates Northings Eastings (ft) (ft) Target Target Shape Type 4255.07 S 8321.25 E Point 8991.00 5923592.00 N 717801.00 E 70° 11' 37.9109" N 211 o 45' 18.2560" E 9036.40 2240.50 S 5117.86 E Point 8970.00 5925517.00 N 714543.00 E 70° 11' 57.7531" N 211 o 43' 45.3831" E 9041.40 2646.02 $ 6068.99 E Point 8975.00 5925138.00 N 715505.00 E 70° 11' 53.7577" N 211 ° 44' 12.9678" E 9061.40 3338.83 S 7315.26 E Point 8995.00 5924480.00 N 716770.00 E 70° 11'46.9328"N 211°44'49.1036'' E 9046.40 3738.26 S 7938.43 E Point 8980.00 5924098.00 N 717404.00 E 70° 11'42.9980" N 211° 45'07.1682" E Current Target Current Target Current Target Current Target Current Target RECEIVED 1 8 Z001 Alaska Oil & Gas Cons. Commission !~nchorao.:~ 5 January, 2001 - 13:53 Page 11 of 11 DrillQuest 2,00. 06 ~LL DLVfAR.S Name +N/-S +E/-W Nonling Easing La~mde Lon~ude Sim 17-99 1367.32 997.46 5927614.78 '/B9365.~13 ~l-'rlg.9~-N 148=18'43.04T~ lOdA ANTI-COLLISION SETIINGS Interpolation Method'MD Interval: 100.00 Depth Range From: 30.00 To: 15115,87 Maximum Range: 1709.65 Reference: Plan: 17-9~ Wp4 -64 --5O --4O --3O --2O --10 -- 0 270 --10 -2O -30 -40 --5O 21t ~om Colour To MD 34 500 500 1000 1000 1500 1500 2000 2000 2500 500O0 2500 3000 3500 --60 -.-' - :: - _ - _. '-64 1~ -~i~.? ~ Tnivelling ~lind~,zimut~(TF~_ ~deg~ Cent~to C~t~ Se~ara~on [20ftFm] 9o T~w,I CB-GYRO-SS ~rarD WLIJ.PATH DI~AII.S Plan 17.22 .~029 Ri~ Doyon 14 Rd'. Danmx V.S~x~n .... 117,1,*;O.{JO 0.00 OOO ~ 16-1~)(16-09). Ma~t~rRi~k ~ 16-10A(16-1OA), Ma~rRkk % Plan: 17-99 Wp4 117-2~dlVnn 17.221 Cn.au'd By: Ihaane Vaagm ~ 01,~L~t. Checked: Dase: ~ SECIION DETAILS Sec MD lac Azi TVD +N/-S +E/.WDL~ TFa~¢ Vgec T~ I 30.00O. OD 0.OD 30.OD O. OD 0.~ O.OO0.011 0.O~ 2 5{10.OD 0.090.OD 5t!1.OD0.00 0.OD0.00O. OD 0.OD 3 700,00 I.gO85.00699.99 o. 15 1.740-5o&q.oo 1.48 900.00 3.0085.(]0 899.8ti 0.76 8.69 I.OD0.OD 7..~9 I IOD.OD 6.0085.001099.~"~ 2.13 24.12.150 OOD 20.68 6 I .~0.00 10.OD 85.001297.23 4.55 52.05 2.00OOD -14,~ 15OD.OD 15.00 85.OD1492.43 8.32 95,15 2.500.OD 80.90 8 2 IOD.OD 15.OD 85.OD207L98 21.86 249.86O. OD 0.OD 212.-82 2r253.64 15.00 115.00 2220,61 15.18 287.745.0[} 104.51 249.18 10 4996.50 15.00 115.OD 4,g'/B.O$ -28&R4931.130.O[I 031} 958.f~3 11 5411.62 48.21 115-10 5218.6_'1 -375.75 1118.43 &OD 0.14 1172..98 12 11OD3.67 48.21 115.10 8945.19 -2144.40 4901.10 GOD 0.00 53.t9.77 13 11263.38 89.72 113.09 9036.39 -2240.65 5117.81 16OD356.97 5576-53 14 12297.36 89.72 113 09 9041.44 -2646.15 60~g_94 0. OD GOD 6607.94 15 12348.298 89.19 119.18 9011.93 -2668.57 6114.63 IZOD95.OD6658.83 16 13~-3.49 89.19 119.18 9061.37 -33.18.99 7315.20 GOD 0.OD 80~3.01 17 13764.64 91.22 12~769~61.22 -3-~0.16 73.50.47 lO.09 60.&q8074.06 18 14463.86 91.=~2 122.76 904fk34 -37.18.44 79.*8.35 O.OD0.00 8769.74 _~ I &8~--35 88.~1 1517,8 9048.16 -3997.97 8180.21 8.009~.97910.1..12. ~ 15115.87 88.21 151.28 9057,32 4255.Z~ 8.12=1,18 0.ODO.OD 9346.08 ~at.L ~'rr.4g~ ANTI-COLLISION SE"I~I~G~ COMPANY ~ SURLY PR~R~I WIJ J MATH I~ ~ +~-S +~-W ~ ~ ~e ~ S~ ~o ~p~Fm ~To Su~'/P~ T~x~] ~n 17-22 Inte~l~on Me~a~ Inte~: 1~.~ M~m R~ge: 17~.65 Ref~e~e: ~: 17-~ W~ ~ s~ I~'SA I~.~ 15115.87 p~: 17-~ W~ VI ~ R~ ~ T~ Cy~ ~ ~.~ ~n~ ~.~ W~: R~ ~ V~ ' ' I I~.17 o. ffi o.~ o.~ --320 12'12 ~ ~ ~ ~om Colour To MD l~ 00 ~~~2- zu~-7~~'..' ~ 500 ~ ~ooo -- 17-11 07-1D, ~ 33~~T'-:.;~-~ -~~.~'}..'~ ~0 1~0 ~ 1500 ~ 200 / / / ' .d/~~ ~f~:-~'.'"--- · ' ~ ,.~, ~o ~ s~oo ~ / ' -' - .-,-~ r - --:-. '- ", . - 50 - ~ / - ._ --50 · . ~ ~ ' .- 't :~- -- -- / ' / "· / / / / 100 t, -- ~ 17-22 W~ (17-~ 17-~) 150 / 200 .X5 ': ~~'" ' . -/ .,// '~ ~ ' ' '~ '"' '"~ ~' ~ .... ._.-.-. .... ,..o..o.... o.. ...o..... . - - - ' ' . // 2 ~.ffi O. ffi 0.~ ~.~ 0,~ 0,~ 0.~ 0,~ 0.~ ~.ffi ~.~ 0.~6 8.~ I.ffi 0.ffi 7.~ ~.~ ,~.= ~.. ~,.,~ ,.~ o.~ ~.~ ~.~ ~1.~ 21.~ 2~.~ 0.ffi 0.ffi 21Z42 ~ ~ 115.ffi ~.61 15.18 ~.74 5.ffi lffi3l 2~.1~ 115.~ ~.0l -2~.~ 931.13 0.~ 0.ffi 9~.~ 115.10 52 IR.~l -375.75 I 1Z~.43 ~ffi 0.14 II~.~ 115.10 ~5.19 -21~.~ ~l.10 O. ffi 0.ffi 113.~ ~.D -22~ 5117.81 16.~ 3~ 557653 113.~ ~1.~ -~.15 ~ Offi 0.~ ~.~ 300 "~-" ~'.~ -~-' ~'"-~ '~'~ ~'~ 320 Hg. ia ~.3~ -3~.~ ~31~.~ 0.~ o.m 122.76 ~1.22 -3~.16 7~.47 io, ffi ~.&s ~4.~ 1~76 ~.~ -37.~.~ ~.35 0.~ 0.~ ~.74 151.~ ~7.32 ~255.Zq 8321.18 ¢ffi O. ffi 9.~ Sperry-Sun Anticollision Report Company: BP Amoco Field: Prudhoe Bay Reference Site: PB DS 17 Reference Well: 17-22 Reference Wellpath: Plan 17-22 Date: 01/05/2001 Time: 14:19:51 Co..ordbmte(N~) Reterence: Well: 17-22, True North Vertieni (TVD) Reference: Nat)om 9ES 66.4 Page: 1 Db: Oracle GLOBAL SCAN APPLIED: All we#paths within 200'+ 100/1000 of reference - There are Tm~l~mmlis in this flLqalcipal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 100.00 ft Error Model: ISCWSA Ellipse Depth Range: 30.00 to 15126.50 ft Scan Method: Trav Cylinder North Maximum Radius: 1709.65 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 11/21/2000 Validated: No Version: 4 Planned From To Survey Toolcode Tool Name 30.00 1000.00 Planned: 17-22 Wp4 V1 CB-GYRO-SS Camera based gyro single shots ~ c-.J e 1000.00 15126.50 Planned: 17-22 Wp4 V1 MWD MWD - Standard ~ oo ~' Casing Points o co MD , TVD Diameter Hole Size Name , ._. ~ ft , ff in ',in · ~ ' t~L] "'9 4268.07 4166.40 9.625 12.250 9 5/8" ~ 10982.98 8931.40 7.000 8.500 7" 15125.50 9057.62 4.500 6.000 4-1/2" Summary , PB DS 16 16-09 16-09 V1 PB DS 16 16-10A 16-10A V3 PB DS 17 17-11 17-11 V1 PB DS 17 17-12 17-12 V1 PB DS 17 17-13 17-13 V1 PB DS 17 17-14 17-14 V1 PB DS 17 17-15 17-15 V2 PB DS 17 17-15APB1 17-15APB1 V3 PB DS 17 17-15A Plan 17-15A V2 11050.00 11400.00 1391.19 493.86 930.79 Pass: Major Risk 14500.00 12400,00 1178.79 624,41 575.31 Pass: Major Risk 1187.39 1200.00 328.88 22.26 306.64 Pass: Major Risk 495,39 500,00 209,72 11.45 198,27 Pass: Major Risk 993,76 1000.00 91.11 20.07 71,05 Pass: Major Risk 1000.14 1000,00 29.04 20,58 8,47 Pass: Major Risk 4218,35 4400.00 241.17 100.98 145.11 Pass: Major Risk 4218.35 4400,00 241.17 100.98 145.11 Pass: Major Risk 4218.35 4400.00 241.17 100.98 145.11 Pass: Major Risk Site: PB DS 16 Well: 16-09 Wellpath: 16-09 V1 Rule Assigned: Major Risk Inter-Site Error: 0.00 ft Reference· .' Offset .Semi. Major Axis "· · Ctr-Ctr No-Go AlloWable MD TVD ". 'MD' TVD Ref .Offset.' .TFO~.AZI' TFO.HS 'CaSing Distance Area ·'Deviation 'Warning ft ft'.' ft. ..,.'ft.. . fi" ' .ft.' ... deg' ...'.deg' · in ft ' ft ft · 11329.19 9036.71 10400.00 8701.96 95.08 36.41 34.73 281.64 11272.81 9036.43 10500.00 8773.62 94.26 38.17 32.51 279.42 11117.10 9006,26 10600.00 8847.11 91.91 41.84 30.47 276.40 11081.75 8990.50 10700.00 8923.12 91.37 44.43 27.25 272.91 11069.26 8984.19 10800.00 9000.09 91.19 46.52 23.72 269.26 11062.98 8980.88 10900.00 9076.86 91.09 48.49 20.01 265.50 11058.45 8978.44 11000.00 9152.75 91.03 50.54 16.17 261.62 11054.98 8976.53 11100.00 9227.90 90.98 52.65 12.22 257.64 11050.00 8973.75 11200.00 9302.26 90.90 54.88 8.20 253.57 11050.00 8973.75 11300.00 9375.36 90.90 57.10 4.11 249.48 11050.00 8973.75 11400.00 9447.25 90.90 59.45 0.00 245.37 11050.00 8973.75 11500.00 9518.19 90.90 61.89 355.91 241.28 11050.00 8973.75 11600,00 9588.72 90.90 64.54 351.86 237.23 11040.16 8968.08 11700.00 9659.24 90.76 67.44 347.92 233.20 11038.65 8967.19 11796.00 9726.95 90.74 69.86 344.23 229.50 1656.73 449.55 1238.39 Pass 1603.69 451.84 1179.59 Pass 1555.07 447.50 1134.86 Pass 1514.91 452.16 1087.77 Pass 1481.61 457.25 1046.40 Pass 1453.05 462.62 1010.36 Pass 1429.66 468.35 980.44 Pass 1411.71 474.30 957.31 Pass 1399.10 480.46 941.03 Pass 1392.01 486.92 931.92 Pass 1391,19 493,86 930.79 Pass 1396.38 501.08 937.50 Pass 1407.95 508.88 952.07 Pass 1426.35 516.39 974.33 Pass 1450,35 523.33 1004.67 Pass Site: PB DS 16 Well: 16-10A Wellpath: 16-10A V3 Rule Assigned: Major Risk Inter-Site Error: 0.00 ft ·' '! ':'' !":' ':: :':: ':" :,:',::i,Ctr~ct~: ,:'N°.Go :,i :AlloWable : ~::' :i,'?:D!S~e: , Deviati0n,',i'i Warning, DATE I CHECK NO. I H 18 0 9 81 ~.~/;',~/ooI oo~.8o%~. VEN~R ALASKAOILA O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET ... 122100 CK122100A 100.00 100. O0 PYMT ;OMMENTS: Per nit To D~iil --ee HANDLING INST: S/H - Te~eie Hub)le X4628 EAI'rACHEDCHECKISINPAY~t=~.'TFORrr~=.~OE~T,;R~.~i.~ABOVE. ~1[I]1111'-~111 --100, O0 100.'00 BP 1EXPLORAT. I. ON (ALA:SKA):.ii.,.!N~, : ':::i:i ::': i.~ST.."~ZT,O..'~:~.,AN~::O~ :.. ~.O..';~:~6~::196612~i::?i?:?~/?~ .".::./ ~i~.'; :?!!i??:i::. '"~"'"~: ............ :'.'.'.::~, .:". :' .,.,~.U^,,.<~ ..: : ~': '.' "....' .. ~:,. :..AN~RO~AG:E;:~;A~S~? 99519.6612 ,~. ~ ~.?.~..:. ~:~'.~ :....~:..... N~'ON~.~,W..$Z"K "':.:~ ~'.': '.: ~:~ :.' ;~'~;~..::'~'::"' . ~ ;':?':?:"~'"' ,:. ~.~:: :~:. '.::.:.:.~::...::,~. 'c~v~L~o,o,~ .':'..: :.. :. ... , ...... ~,;,'~,, ',;:.. ':"..::;~;::;;:,~;~8977:: 412 PAY The? O~.DER :.,::.ALASKA OIL 'CONs:~R VA T I oN!il ' C~M~;~Z ~ 'r O:~ ':!::::ii:~,!::':I ?::ii'::'....:..: :i~:,':::33~. ,;~:,EST 7TH:'?~E~UE:?:~': ANCHORAGE AK 99501 WELL PERMIT CHECKLIST COMPANY WELL NAME/'7- ~ PROGRAM: exp dev '.,/ redrll ~ serv ~ wellbore seg ~ann. disposal para req ~ FIELD & POOL ~ ~'/_..~/._..~ INIT CLASS .~/,/ //-.){'(-.- ADMINISTRATION A~,~ DATE I.~z.ol 1. Permit fee attached ............. , .... 2. Lease number appropriate.~.-. 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from ddlling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available' in ddlling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can.be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor stdng provided ................... 15. Surface casing protects all known USDWs.... ........ 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. GEOL AREA ,5:~'~_} UNIT# ~//~ ON/OFF SHORE 21. If a m-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ~-(~r...~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. GEOLOGY 'APPR DATE .q,~ i, z.2_,:bl 30. Permit can be issued wlo hydrogen sulfide measures ..... 31. Data presented on potential overpressure zones ....... ~N 32. Seismic analysis of shallow gas zones ............. 33. Seabed ~ndition suwey (if off-shore) ............ 34. Conta~ name/phone for weekly progress repods [explog~ only] Y N · ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ........ Y N APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N G E O L~Y: ENGINEERING: UIC.~/_Annular COMMISSION: JMH ~;:~. J0'J . Comments/Instructions: c:~nsoffice\wordian\diana\checklist (rev. 111011/00) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this. .. nature is accumulated at the end of the file under APPENDIXl ., No 'special 'effort has been made to chronologically". . organize this category of information. Sperry-Sun Drillina Services LIS Scan UtiliEy SRevision: 3 $ LisLib SRevision: 4 $ Mort Jul 29 17:56:56 2002 Reel Header Service name ............. LISTPE Date ..................... 02/617/29 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LIST?E Date ..................... 02/07/29 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MM-10084 C.A. DEMOSKI D. WILLIAMS 17-22 500292300000 BP Exploration (Alaska), Inc. Sperry Sun 29-JUL-02 MWD RUN 2 MWD RUN 3 AK-MM-10084 AK-MM-10084 C.A. DEMOSKI C.A. DEMOSKI D. WILLIAMS D. WILLIAMS JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MW[) RUN 4 AK-MM-lO084 C.A. DEMOSKI D. WILLIAMS MWD RUN 5 MWD RUN 6 AK-MM-10084 AK-MM-lO084 D. HAWKINS D. HAWKINS D. WILLIAMS D. WILLIAMS JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 7 AK-MM-10084 J. SACK D. WILLIAMS MWD RUN 8 MWD RUN 9 AK-MM-10084 AK-MM-10084 J. SACK G. NIEHAUS T. ANGLEN D. WILLIAMS 22 i0N 15E 2264 4183 .00 64.80 36.20 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) iST STRING 13.500 10.750 4378.0 2ND STRING 6.750 7.000 10983.0 ~RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE STATED. 2. MWD RUNS 2 - 8 ARE DIRECTIONAL WITH DUAl, GAM~A RAY (DGR) UTILIZING GEIGER MUELLER TUBE DETECTORS. MWD RUN 9 IS DIRECTIONAL WITH DUAL G~d~MA RAY (DGR) UTILIZING GEIGER MUELLER TUBE DETECTORS MD ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4). 4. THE GAP IN THE GAMMA RAY DATA FROM 4339' MD, 4237' TVD TO 4353' MD, 4250' T IS DUE TO A CHANGE IN SENSOR TO BIT DISTANCE. 5. GAMMA RAY IS LOGGED BEHIND CASING FROM 4353' MD, 4250' TVD TO 4378' MD, 4275' TVD. GAMMA RAY IS LOGGED BEHIND CASING FROM 10950' MD, 8919' TVD TO 10983' MD, 8940' TVD. 7. DEPTH SHIFTING / CORRECTION WAIVED BY T. ARCHULETA OF BP EXPLORATION (ALASKA), INC. PER THE EMAIL FROM D. SCNORR OF 03/06/02. MWD CONSIDERED PDC. ALL MWD LOG AND HEADER DATA RETAINS THE ORIGINAL DRILLER'S DEPTH REFERENCES. MWD RUNS 1. - 9 REPRESENT WELLl'?-22 WITH API # 50-029-23000-00. THIS WELL REACHED A TOTAL DEPTH OF 14819' MD, 9056' SSTVD. SROP = SMOOTHED RATE OF PENETRATION SGRC = SMOOTHED GAMMA RAY COMBINED SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( EXTRA SHALLOW SPACING ) SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( SHALLOW SPACING ) SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( MEDIUM SPACING ) SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( DEEP SPACING ) SFXE = SMOOTHED FORMATION EXPOSURE TIME $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 125.0 14757.5 ROP 181.0 14819.0 FET 10973.0 14763.5 RPD 10973.0 RP.M 10973.0 RPS 10973.0 RPX 10973.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD MWD MWD MWD $ REMARKS: 14763.5 14763.5 14763.5 14263.5 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP 1 125.0 2 3547.5 3 4394.5 4 5083.5 5 8239.5 6 9547.5 7 10076.5 8 10499.5 9 10983.5 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-t~ve...0 MERGE BASE 3547 0 4394 0 5083 0 8239 0 9547 0 10076 0 10499 5 10983 0 14819 0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD AP1 4 i 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 i 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HR 4 1 68 28 8 First Name Service Unit Min Max Hean Nsam Reading DEPT FT 125 1.,4819 7472 29389 i[25 ROP MWD FT/H 0.13 349.24 97.4968 292'77 181 GR MWD AP1 12.9 545.12 70.6794 29238 125 RPX MWD OHMM 0.98 2000 44.8227 7582 10973 RPS MWD OHMM 0.42 2000 38.0167 7582 10973 RPM MWD OHMM 0.82 2000 25.7495 7582 10973 RPD MWD OHMM 0.09 2000 30.1352 7582 10973 FET MWD HR 0.38 116.67 2.1392 7582 10973 First Reading For Entire File .......... 125 Last Reading For Entire File ........... 14819 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Last Reading 14819 14819 14757.5 14763.5 14763.5 14763.5 14763.5 14763.5 Ne:<t File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Nu~er ........... 1.0.0 Date of Generation ....... 02/07/29 Ma:.<imum Physical Record..65535 File Tp~pe ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BlT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 125.0 ROP 181.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT' SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (?PM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ STOP DEPTH 3491.0 3547.0 16-MAR-01 Insite 4.05.5 65.44 Memory 3547.0 .0 16.6 TOOL NUMBER PBO1902FHG8 13.500 Spud 9.30 320.0 9.0 6OO 7.6 ,000 .0 .000 88.0 .000 ,0 .000 .0 Dar_a Format Specification Record Data Record T.x~,e .................. 0 Data Specification Block Type ..... 0 Logging Dire,stion ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-tppe...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 l ROD MWD010 FT/H 4 1 68 4 2 GR MWD010 AP1 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 125 3547 1836 6845 ROP MWD010 FT/H 10.07 349.24 106.976 6733 GR MWDO10 API 18.79 110.65 49.4311 6733 First Reading For Entire File .......... 125 Last Reading For Entire File ........... 3547 File Trailer Service name ............. STSLIB.002 Service Sub Level. Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Haximum Physical Record..65535 File Tpe ................ LO Next File Name ........... STSLIB.003 First Reading 125 181 125 Last Reading 3547 3547 3491 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 3491.5 4339.0 ROP 3547.5 4394.0 $ LOG HEADER DATA DATE LOGGED: 17-MAR-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 65.44 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 4394.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): P~iT ROTATING SPEED (RPM): i{OLE ]iNCLINATION (DEG MINIMUM ANGLE: i4.ADiIMUM ANGLE: 14 .1 15.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NU?-'IBER DGR DUAL GAMMA RAY PBO1902FHG8 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 13.500 4378.0 BOREHOLE CONDITIONS MUD TYPE: Spud MUD DENSITY (LB/G): 9.60 MUD VISCOSITY (S): 102.0 MUD PH: 8.9 MUD CHLORIDES (PPM): 600 FLUID LOSS (C3): 6.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specifica'tion Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEFT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 .0 91.4 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 3491.5 4394 3942.75 1806 ROP MWD020 FT/H 1,.86 186.77 100.037 1694 GR MWD020 API 42.31 114.13 81.309 1696 First Reading For Entire File ........... 3491.5 Last Reading For Entire File ........... 4394 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 First Reading 3491.5 3547.5 3491.5 Last Reading 4394 4394 4339 File Type ................ LO Ne:<t File Name ........... STSLIB.0Cl4 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date ,of Generation ....... 02/07/29 Haximum Physical Record..65535 File Tpe ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEP'rH GR 4353.5 ROP 4394.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): 'POP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE 'POOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): HUD PH: MUD CHLORIDES (PPH): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): HUD AT HAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL, MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REHARKS: STOP DEPTH 5049.5 5083.0 21-MAR-01 Insite 4.05.5 66.16 Memory 5083.0 14.8 24.5 TOOL NUMBER PBO1917HWG6 9.875 LSND 9.30 44.0 9.4 4OO 4.0 .000 .0 .000 86.0 .000 .0 .000 .0 S Da~a Fc, rmat Specification Record Data Record Data Specification Biock TFpe ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 . lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DE PT FT 4 1 6 8 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 4353.5 5083 4718.25 1460 ROP MWD030 FT/H 2.32 324.22 138.411 1378 GR MWD030 API 15.7 117.3 57.1038 1393 First Reading For Entire File .......... 4353.5 Last Reading For Entire File ........... 5083 File Trailer Service name ............. STSLIB.O04 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Haximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 First Reading 4353.5 4394.5 4353.5 Last Reading 5083 5083 5049.5 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 5050.0 8205.0 ROP 5083.5 8239.0 $ LOG HEADER DATA DATE LOGGED: 24-MAR-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 66.16 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 8239.0 '?OP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LiT ROTATING SPEED (RPH): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY S BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S): MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT': NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth uni, ts ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Hax frames per recerd ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 26.9 50.8 TOOL NUMBER PBO1917HWG6 9.875 LSND 9.40 44.0 9.4 200 4.6 .000 .000 .000 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DE PT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR HWD040 AP1 4 1 68 8 3 .0 104.1 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 5050 8239 6644.5 6379 ROP MWD040 FT/H 3.61 248.22 118.616 6312 GR MWD040 API 20.37 ].32.86 68.235 6311 First Reading For Entire File .......... 5050 Last Reading For Entire File ........... 8239 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 First Reading 5050 5083.5 5050 Last Reading 8239 8239 8205 Maximum Physical Record..65535 File T 5,,T,e ................ LO Ne:.:~ File Name ........... STSL!B.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date ef Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8205.5 ROP 8239.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AY' TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): STOP DEPTH 9510.0 9547.0 25-MAR- 01 Insite 4.05.5 66.16 Memory 9547.0 46.8 49.3 TOOL NUMBER PBO1917HWG6 9.875 LSND 10.70 47.0 9.0 100 4.2 .000 .0 .000 111.6 .000 .0 .000 .0 REMARKS: $ D_~ta Format Specifi,sation Record Data Record Ty~,e .................. 0 Data Specification Block Logging Direction ................. Down Optical log depth units ........... Fee~ Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 8205.5 9547 8876.25 2684 ROP MWD050 FT/H 5.1,3 203.15 114.024 2616 GR MWD050 API 42.82 ].87.59 106.6 2610 First Reading For Entire File .......... 8205.5 Last Reading For Entire File ........... 9547 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 First Reading 8205.5 8239.5 8205.5 Last Reading 9547 9547 9510 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9510.5 10037.5 ROP 9547.5 10076.0 $ LOG HEADER DATA DATE LOGGED: 27-MAR-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 66.16 DATA TYPE (MEMORY OR REAL-TIME): Memory ?[} DRILLER (FT): 10076.0 'TOP I,OG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): E'.IT ROTATING SPEED (RPM): HOLE INCLINATION (DEG HINIMUM ANGLE: 46.3 N~i~IMUM ANGLE: 4 9. i TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMPIA RAY PB01918HWG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.875 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.90 MUD VISCOSITY (S): 16.0 MUD PH: 9.3 MUD CHLORIDES (PPM): 100 FLUID LOSS (C3): 3.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL, MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. ]Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Dep'th Units ....................... Datum Specification Block sub-'type...0 Name Service Order Units Si, ze Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD060 FT/H 4 1 68 4 2 GR MWD060 API 4 i 68 8 3 .0 122.2 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 9510.5 10076 9793.25 1132 ROP MWD060 FT/H 0.17 304.4 71.5269 1058 GR MWD060 API 65.21 244.32 145.312 1055 First Reading For Entire File .......... 9510.5 Last Reading For Entire File ........... 10076 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 First Reading 9510.5 9547.5 9510.5 Last Reading 10076 10076 10037.5 Date of Generation ....... 02/07/29 !,'Iaximum Physical Record..65535 - File TFpe ................ LO Next File Name ........... STSLI?..008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07./2_c Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10038.0 10461.5 ROP 10076.5 10499.5 $ LOG HEADER DATA DATE LOGGED: 30-MAR-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 66.16 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10499.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 45.6 MAXIMUM ANGLE: 48.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOl, CODE TOO1., TYPE TOOl, NUMBER DGR DUAL GAMMA RAY PB01918HWG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.90 MUD VISCOSITY (S): 43.0 MUD PH: 9.4 MUD CHLORIDES (PPM): 100 FLUID LOSS (C3): 3.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 136.2 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON 'POOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Forma~ Specification Record Data Record Type .................. 0 Data Specification Block T.~,e ..... 0 Logging Direction ................. Down Optical log depth units ........... Fee~ Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lIN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DE PT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 ~ Name Service Unit Min Max Mean Nsam DEPT FT 10038 10499.5 10268.8 924 ROP MWD070 FT/H 0.32 49.68 ]..9.334 84"7 GR MWD070 API 86.22 228.24 156.317 848 First Reading For Entire File .......... 10038 Last Reading For Entire File ........... 10499.5 File Trailer Service name ............. STSLIB.O08 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 First Reading 10038 1.0076.5 10038 Last Reading 10499.5 10499.5 10461.5 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit .run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL, CODE START DEPTH STOP DEPTH GR 10462.0 10950.5 ROP 10500.0 10983.0 $ LOG HEADER DATA DATE LOGGED: 01-APR-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE 'VERSION: 66.16 DATA TYPE {MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): :,~,TT~M LOG INTERVAL ~ FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: Memo Fy 1{1983. 48.0 48.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB01918HWG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.875 10983.0 BOREHOLE CONDITIONS HUD TYPE: LSND MUD DENSITY (LB/G): 10.90 MUD VISCOSITY (S): 41.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 100 FLUID LOSS (C3): 2.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth, units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification, Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD080 FT/H 4 1 68 4 2 GR MWD080 API 4 1 68 8 3 .0 146.0 · 0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 10462 10983 10722.5 1043 ROP MWD080 FT/H 0.33 108.2 18.1682 967 GR MWD080 API 82.92 367.18 190.307 978 First Reading For Entire File .......... 10462 Last Reading For Entire File ........... 10983 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... First Reading 10462 10500 10462 Last Reading 10983 10983 10950.5 Yersion Number ........... 1.0. Date of Generati©n ....... 02/07/29 }Ia.~.:l:'::um Physical Record..65535 File Type ................ Ne.V~ File Name ........... STSLIB. 010 Physical EOF File Header Service name ............. STSLIB.0i0 Service Sub Level Name... Version Number ........... 1.0.0 Date ef Generation ....... 02/07/29 Haximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.009 Comment Record FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10951.0 14757.5 RPD 10973 0 14763.5 RPM 10973 0 14763.5 RPS 10973 0 14763.5 RPX 10973 0 14763.5 FET 10973 0 14763.5 ROP 10983 5 14819.0 $ LOG HEADER DATA DATE LOGGED: il-APR-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite 4.05.5 DOWNHOLE SOFTWARE VERSION: 65.44 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 14819.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 49.5 MAXIMUM ANGLE: 91.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE 'POOL, TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB01947GR4 EWR4 ELECTROMAG. RESIS. 4 PB01947GR4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.50 MUD VISCOSITY (S): 41.0 MUD PH: 8.8 MUD CHLORIDES (PPM): 300 FLUID LOSS (C3): 8.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 2.900 88.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.705 154.4 MUD FILTRATE AT MT: 2.600 77.0 MUD CAKE AT MT: 2.900 77.0 NEUTRON TOOl !"IATR i Il: MATR!:'i DENSITY: HOLE CORRECTION {iN:: FOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Da~a Format Specification Record Data Record Tpe .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical leg depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Hax frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD090 FT/H 4 i 68 GR HWD090 AP1 4 1 68 RPX HWD090 OHHH 4 1 68 RPS HWD090 OHMM 4 1 68 RPM MWD090 OHMM 4 1 68 RPD MWD090 OHMM 4 1 68 FET MWD090 HR 4 i 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 2O 6 24 7 28 8 Name Service Unit Min Max DEPT FT 10951 148].9 ROP MWD090 FT/H 0.13 1,98.22 eR MWD090 API 12.9 545.12 RPX MWD090 OHMM 0.98 2000 RPS MWD090 OHMM 0.42 2000 RP~ MWD090 OHMM , .0...82 2000 RPD MWD090 OHMM 0.09 2000 FET MWD090 HR 0.38 116.67 First Reading For Entire Fi. le .......... 10951 Last Reading For Entire File ........... 14819 File Trailer Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 02/07/29 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.011 Mean Nsam 12885 7737 80.4669 7672 44.0533 7614 44.8227 7582 38.0167 7582 25.7495 7582 30.3.352 7582 2.1.392 7582 First Last Reading Reading 1.0951 148]..9 10983.5 148]_9 10951 14757.5 10973 14763.5 10973 14763.5 10973 14763.5 10973 14763.5 10973 14763.5 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 02/07/29 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Scientific Technical Services Date ..................... 02/07/29 Origin ................... STS Reel Name ................ ,'2ontinuation Number ...... 01 Ne:,~t Reel Name ........... Cc, mments ................. STS LIS Writing LibraL-y. Scientific TechF~ical Services Physical EOF Physical EOF End Of LIS File