Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout190-136 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Sunday, September 20, 2015 5:54 PM To: AK, OPS GC1 OSM;AK, OPS GC1 Field O&M TL; AK, OPS GC1 Facility OTL;AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad YP; Odom, Kristine; Wallace, Chris D (DOA) Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Regg, James B (DOA) Subject: OPERABLE: Producer P-19 (PTD#1901360) TIFL Passed Post Valve Change Out Attachments: Producer P-19 (PTD #1901360) TIO Plot.docx All, Producer P-19 (PTD#1901360) passed TIFL on September 20, 2015 following gas lift valve work. This passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. • Well status is Operable • A SSSV is not required A copy of the TIO plot is included for reference. Thank you, Kevin Parks (Alternate: Whitney Pert BP Alaska-Well Integrity Coordinator GWGlobal Wells Organization SCA*" JUN 0 12016 Office: 907.659.5102 WIC Email:AKDCWeIlIntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Thursday, September 10, 2015 7:36 AM To: AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad YP; Odom, Kristine; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Regg, James B (DOA) (jim.reqg@alaska.gov); Pettus, Whitney Subject: UNDER EVALUATION: Producer P-19 (PTD #1901360) Sustained Inner Annulus Casing Pressure over MOASP All, Producer P-19 (PTD#1901360) was reported to have sustained inner annulus casing above MOASP on September 7th, 2015. The pressures were confirmed to be TBG/IA/OA= 2050/2050/0 psi. A warm TIFL subsequently failed on 1 • • • September 9th, 2015 indicating a lack of potential downhole barriers. At this time,the well has been reclassified as Under Evaluation for further diagnostics. Plan Forward: 1. Downhole Diagnostics:TIFL—FAILED 09/09/15 2. Slickline: Change out orifice gas lift valve 3. Well Integrity Engineer: Additional diagnostics as needed Please call with any questions or concerns. Thank you, Whitney Pettus (Alternate: Kevin Parks) BP Alaska-Well Integrity Coordinator GW WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com 2 • • Producer P-19(PTD#1901360)TIO Plot a OM ten. m )1111r _AMA 04.1.15 Xi't! m.»5 Na'n a715. mmn at..IS 18,15 • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Thursday, September 10, 2015 7:36 AM To: AK, OPS GC1 OSM;AK, OPS GC1 Field O&M TL; AK, OPS GC1 Facility OTL;AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad VP; Odom, Kristine; Wallace, Chris D (DOA) Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Regg, James B (DOA); Pettus, Whitney Subject: UNDER EVALUATION: Producer P-19 (PTD#1901360) Sustained Inner Annulus Casing Pressure over MOASP All, Producer P-19 (PTD#1901360) was reported to have sustained inner annulus casing above MOASP on September 7th, 2015. The pressures were confirmed to be TBG/IA/OA= 2050/2050/0 psi. A warm TIFL subsequently failed on September 9th, 2015 indicating a lack of potential downhole barriers. At this time, the well has been reclassified as Under Evaluation for further diagnostics. Plan Forward: 1. Downhole Diagnostics:TIFL—FAILED 09/09/15 2. Slickline: Change out orifice gas lift valve 3. Well Integrity Engineer: Additional diagnostics as needed Please call with any questions or concerns. Thank you, Whitney Pettus (Alternate:Kevin Parks) SCANNED MAR 0 8 2016 BP Alaska-Well Integrity Coordinator G WIC Office: 907.659.5102 WIC Email: AKDCWeIlIntegrityCoordinator@BP.com 1 &eau f +ct • • ( i Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWellIntegrityCoordinator @bp.com] Qec °5/2-1c 5 Sent: Thursday, May 02, 2013 10:37 AM To: AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad YP; Charles, Marcus A; Weiss, Troy D; Regg, James B (DOA); Schwartz, Guy L (DOA) Cc: AK, D &C DHD Well Integrity Engineer; AK, D &C Well Integrity Coordinator; Holt, Ryan P Subject: OPERABLE: Producer P -19 (PTD # 1901360) Passing TIFL All, Producer P -19 (PTD #1901360) passed a TIFL on 05/01/2013 after being brought back online from a pad shutdown. The passing TIFL confirms two competent barriers in the welibore. The well is reclassified as Operable. Please call with any questions. Thank you, Jack Disbrow :: , su mo JUL 0 8 `1.013 BP Alaska - Well Integrity Coordinator Glob& Wells Drganizatior Office: 907.659.5102 WIC Email: AKDCWeIIIntegrityCoordinator bp.com From: AK, D &C Well Integrity Coordinator Sent: Monday, April 22, 2013 11:36 PM To: AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpa• Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Well Services Operations Team Lead; AK, %: C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS -II Pad YP; Charles, Marcus A; Weiss, Troy D; 'jim.regg @alaska.gov'; 'Schwartz, Guy L (DOA)' Cc: AK, D &C DHD Well Integrity Engineer; Climer, Laurie A; Clingingsmith, Mike J Subject: Under Eval: Producer P -19 (PTD # 1901360) Sustained Inner Annulus C. ng Pressure Above MOASP All, Producer P -19 (PTD# 1901360) broke MOASP during a pad shut in. At th': time, the well is able to be brought back online for further diagnostics. The well has been reclassified as Under Eval ion. Plan Forward: 1. Bleed IA as necessary 2. DHD to perform TIFL Regards, / Laurie Climer (1 itern iie•:.Icrr•k L3i.Nhrour) r' BP Alaska - Well Integrity Coordirrator Gkp ,o: W?'` i:i £fir aro aI!on 1 • • P -1 Pr no( 3,(:) Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [AKDCWeIIIntegrityCoordinator @bp.com] Sent: Saturday, April 13, 2013 10:39 AM To: Regg, James B (DOA); Schwartz, Guy L (DOA) Subject: NOT OPERABLE: Producer P -19 (PTD # 1901360) Sustained Inner Annulus Casing Pressure Above MOASP Attachments: Producer P -19 (PTD #1901360) TIO Plot.docx Jim, Guy Please note that P -16 is not over MOASP as stated below. P -19 has sustained inner annulus pressure above MOASP. Please disregard the original email and reference the correct email as follows: All, Producer P -19 (PTD #1901360) was found to have sustained inner annulus pressure above MOASP due to P -pad having been shut in for critical construction in the area. The well is reclassified as Not Operable until the pad is brought back online and a TIFL can be performed to verify tubing integrity. Plan forward: 1. DHD: Perform warm TIFL once P -pad is back online A copy of the TIO plot is included for reference. Please call with any questions. SCANNED J , �L U 8 2013 Thank you, Jack Disbrow BP Alaska - Well Integrity Coordinator GVV Global Wells f rganizatior! Office: 907.659.5102 WIC Email: AKDCWeIllntegrityCoordinator Pbp.com From: AK, D &C Well Integrity Coordinator Sent: Saturday, April 13, 2013 9:46 AM To: AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad YP; Charles, Marcus A; 'jim.regg @alaska.gov'; 'Schwartz, Guy L (DOA)'; Weiss, Troy D Cc: AK, D &C DHD Well Integrity Engineer; AK, D &C Well Integrity Coordinator; Holt, Ryan P; Walker, Greg (D &C) Subject: NOT OPERABLE: Producer P -16 (PTD # 1901630) Sustained Inner Annulus Casing Pressure Above MOASP All, Producer P -16 (PTD #1901630) was found to have sustained inner annulus pressure above MOASP due to P -pad having been shut in for critical construction in the area. The well is reclassified as Not Operable until the pad is brought back online and a TIFL can be performed to verify tubing integrity. Plan forward: 1. DHD: Perform warm TIFL once P -pad is back online A copy of the TIO plot is included for reference. 1 • Please call with any questions. Thank you, Jack Disbrow BP Alaska - Well Integrity Coordinator G �9 Global Wells �! �! Organization Office: 907.659.5102 WIC Email: AKDCWeIIIntegrityCoordinator Pbp.com 2 PBU P-19 PTD #1901360 4/13/2013 TIO Pressures Plot Well: P-19 • 3.000 Tbg —II— LA 2,000 00A —40— 000A On 1. CO0 Mar • 01119113 01/261 3 02102113 02 02/16113 02/23/13 03/02/13 03109/13 03/16/13 03123/13 03/30/13 04.061 3 041 313 • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 August 22, 2011 r ?..UL RECEIVED' AUG 3 1 NV Mr. Tom Maunder Ci�CeN�'jsE�011 Alaska Oil and Gas Conservation Commission mm Q 1 333 West 7 Avenue CMS Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB P -Pad q o 36 Dear Mr. Maunder, '— I Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB P- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) P -Pad Date: 07/21/11 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal P -01 1920920 500292228700 0.30 NA 0.30 NA 0.85 4/24/2010 P -02A 2000840 500292237601 0.30 NA 0.30 NA 4.25 4/25/2010 P -03A 1972280 500292217601 12.70 5.0 0.30 7/12/2010 2.55 8/5/2010 P -04 1910760 500292218000 1.80 NA 1.80 NA 15.30 4/25/2010 P -05A 2000510 500292254501 0.80 NA 0.80 NA 5.95 4/25/2010 P -06B 2051380 500292216602 11.30 3.0 1.00 7/12/2010 9.35 8/5/2010 P -07A 2011960 500292253501 0.50 NA 0.50 NA 1.70 4/24/2010 P -08A 2000850 500292237701 0.10 NA 0.10 NA 0.85 4/24/2010 P -09 1930580 500292236200 0.10 NA 0.10 NA 0.85 4/24/2010 P -10 1910520 500292215800 3.00 NA 3.00 NA 28.05 4/24/2010 P -11 1910290 500292214300 3.00 NA 3.00 NA 23.80 4/23/2010 P -128 2001330 500292213602 0.30 NA 0.30 NA 0.85 4/23/2010 P -13 1901110 500292208000 0.30 NA 0.30 NA 1.70 4/23/2010 P -14 1910070 500292212900 7.50 NA 7.50 NA 56.10 7/21/2011 P -16 1901630 500292211300 4.30 NA 4.30 NA 37.40 4/22/2010 P -17 1901550 500292210500 8.00 NA 8.00 NA 89.30 4/28/2010 P -19 1901360 500292209400 0.80 NA 0.80 NA 5.10 4/21/2010 P -20B 2001590 500292208902 0.20 NA 0.20 NA 0.85 4/21/2010 P-21B 1970640 500292214802 0.40 NA 0.40 NA 4.30 4/21/2010 P -22 1931210 500292239600 0.30 NA 0.30 NA 1.70 4/23/2010 P -23 1931120 500292239300 0.30 NA 0.30 NA 0.85 4/24/2010 P -24 1970540 500292275500 1.80 NA 1.80 NA 8.50 4/24/2010 P -25 1970260 500292274200 64.00 24.0 2.60 7/17/2011 23.80 7/20/2011 P -26 1962000 500292272700 2.60 NA 2.60 NA 22.10 4/25/2010 P -27 2040500 500292320300 1.00 NA 1.00 NA 6.80 4/25/2010 P -28 2100480 500292342500 1.20 NA 1.20 NA 10.20 8/7/2010 OR BEFORE c:~O~n°c STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COMMISSIC REPORT OF SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2960' SNL, 2950' WEL, SEC. 31, T11N, R13E At top of productive interval 276' SNL, 1302' WEL, SEC. 6, TION, R13E At effective depth 482' SNL, 1266' WEL, SEC. 6, TION, R13E At total depth 564' SNL, 1247' WEL, SEC. 6, TION, R13E 5. Type of Well: Development X Exploratory Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) 91.90 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number P-19 (41-06-10-13) 9. Permit number/approval number 90-136 / 10. APl number 50- 029-22094 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2654 Intermediate 9732 Production -- Liner 829 Perforation depth: measured 10360' feet Plugs (measured) 9271 feet 10236' feet Junk (measured) 9180' feet Size Cemented Measured depth 146 2680 9768' 20 10-3/ 3720 c.f 7-5/8" 1392 c.f 5,1/2" 182 c. f 9531 - 10360 9980'- 10020', 10032-10075', 9942'- 9952',9962'- 9990 True vertical depth BKB 146 2588 7381 7236- 7733 true vertical subsea 7485-8969 (four intervals) Tubing (size, grade, and measured depth) 4-1/2" 12.6#1-80 @9534 Packers and SSSV (type and measured depth) TlWpacker @ 9440' SSSV @ 2090' RECEIVED 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure JUN I 5 i994 aisska Oil & Oas Cons. Commissior. Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 400 389 210 1137 450 147 334 1276 Tubing Pressure 232 233 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended. , Service 17. I hereby (~ertify that the foregoing is true and correct to the best of my knowledge. S~gned' ~~ (._ / ~ ,d~ Title Senior Technbal Assistant I Form 10-404} Rev 06/15/88 Date ~,//$/~ SUBMIT IN DLfPLI6ATE~ ?, 2/12/93 WELL P-19(41-06-10-13) Stimulation Operation A HCL Acid Wash Treatment was performed using the following fluids: 9/30/93 fjh 6/13/94 SUMMARY LIQUID PACKED WELL WITH 100 BBLS SW. WASHED PERFS WITH 46 BBLS 15% HCL/10% XYLENE. RETURN WELL TO PRODUCTION AND BEGIN FLOWBACK SAMPLING. BBLS. 140 46 30 FLUIDS PUMPED 3 MICRON FILTERED 140 F SEA WATER 15% HCL / 10 % XYLENE W/1% ACI-274, 0.4% NE41, 0.7% S- 500, 0.2% Inflo45, 24 ppt Ferrotrol -210 METHANOL A 5% HCL Acid Wash Treatment was performed using the following fluids: JOB SUMMARY RIH WHILE PUMPING SW, TAGGED TD AT 10097,S/L CORRECTED TD WAS 100075. DID NOT MAKE ANY COIL DEPTH CORRECTION, FELT COIL JUST RUNNING THROUGH CL. PRESSURE TESTED BJ AND PUMPED 254 BBLS OF 5% HCL WHILE RECIPROCATING NOZZLE ACROSS PERFS. SAW NO PRESSURE RESPONSE THROUGHOUT THE FIRST 180 BBLS. PRESSURE SLOWLY ROSE AT THAT POINT. DISPLACED ACID OUT OF THE CT WITH 23 BBLS SW AND CONTINUED TO PUMP AN ADDITIONAL 55 BBL SW WHILE POOH TO ENSURE ALL ACID BEHIND PIPE. POOH AND F/P WITH 24 BBL METH. RETURNED WELL TO PRODUCTION WITH INSTRUCTIONS TO BRING ON PER PROGRAM. FLUID SUMMARY 94 BBL SW FILTERED TO 3 MICRON 254 BBL HCL 78 BBL SW 24 BBL METHANOL ADDITIVES 5% HCL 4 GPT NE-41 2 GPT-MS-10 25 PPT FERROTROL 210 4 GPT ACI-274 RECEIVE 0ii & Oas Cons. Cornmissior Anchorage ...... STATE OF ALASKA AL ~A OIL AND GAS CONSERVATION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other. 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2960' SNL, 2950' WEL, SEC. 31, T11N, R13E 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) 91.90 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number P-19 (41-06-10-13) At top of productive interval 276'SNL, 1302' WEL, SEC. 6, TION, R13E At effective depth 482' SNL, 1266' WEL, SEC. 6, TION, R13E At total depth 564' SNL, 1247' WEL, SEC. 6, TION, R13E 9. Permit number/approval number 90-136/N/A 10. APl number 50- 029-22094 11. Field/Pool Prudhoe Off Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2654 Intermediate 9732 Production -- Liner 829 Perforation depth: measured 10360'feet Plugs (measured) 9271feet 10236'feet Junk (measured) 9180feet Size Cemented Measured depth 2O 146 10-3/4" 3720 c.f 2680 7-5/8" 1392 c.f 9768' 5-1/2" 182 c.f 9531-10360 9980'- 10020', 10032-10075', 9942'- 9952',9962'- 9990 True vertical depth BKB 146 2588 7381 7236-7733 true vertical subsea Tubing (size, grade, and measured depth) 4-1/2" 12.6//1-80 @9534 Packers and SSSV (type and measured depth) TlWpacker@ 9440' SSSV @ 2090' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure 640 471 28 667 3040 ~ 2636 84 1091 Tubing Pressure 22O 251 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/8 SUBMIT IN DUPLICATE WELL 'P-19 (41-.06-10.13) ADDED PERF/FRAC The following interval was reperforated on 4/20/91 using 3 3/8 gun diameter with 6 shot density, random orientation and 60 phasing. 9918' 9950' Performed hydraulic fracture on 5/3-4/91. Pumped 97,000 4/. of 16/20 CL and left 3,000 4/ in the Liner. After the frac the ISIP was 3000 PSI. 4/02/92 fjh STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSi,_., REPORT OF SUNDRY WELL 1. Operations performed: Operation shutdown Stimulate . Plugging Puli tubing Alter casing Repair well . Perforate X Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2960' SNL, 2950' WEL, SEC. 31, T11N, R13E 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) 91.90 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number P-19 (41~06-10-13) At top of productive interval 276' SNL, 1302' WEL, SEC. 6, TION, R13E At effective depth 482' SNL, 1266' WEL, SEC. 6, TION, R13E At total depth 564' SNL, 1247' WEL, SEC. 6, TION, R13E 12. Present well condition summary Total depth: measured true vertical 103601eet Plugs (measured) 9271feet 9. Permit number/approval number 90-136/N/A 10. APl number 50- 029-22094 11, Field/Pool Prudhoe Oil Pool Effective depth: measured 10236~[eet Junk (measured) true vertical 91801eet Casing Length Size Cemented Structural -- Conductor 110 20 Surface 2654 10-3/4" 3720 c.f Intermediate 9732 7-5/8" 1392 c.f Production -- Liner 829 5-1/2" 182 c.f Perforation depth: measured 9980'- 10020', 10032-10075', 9942'- 9952',9962'- 9990 Measured depth 146 268O 9768' 9531-10360 true vertical subsea 7485-8969 (four intervals) Tubing (size. grade, and measured depth) 4-1/2" 12.6~ 1-80 @9534 Packers and SSSV (type and measured depth) TIWpacker@ 9440' SSS V @ 2090' True vertical depth BKB 146 2588 7381 7236-7733 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure Added perfs 9942'-9952', and 9962-9990' on February 11, 1990 3.375gun, 41B HJ2, HPD, 4 spf. 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 1'5. Attachments Copies of Logs and Surveys run. Daily Report of Well Operations 780 409 39 620 205 840 ~'~' 469 33 657 209 16. Status of wellclassification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~lned /. ~- · ~,~,.) ~/,~4,~./'~ Title Supervisor waterflood & Miscible flood Form 10-404 Rev 0~,~15/j~8 Date SUBMIT IN DUPLI(~ATE BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :05/14/91 T#:82386 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-23 E-19 M-21 -'P-17 U-11 W-25 · ~ X-07 7-20 Gas Entry Survey 04/24/91 #1 10100-10480 Camco 5" Gas Entry/Prod-F 04/19/91 # 1 11450-11690 Camco 5" Gamma -Ray 04/16/91 # 1 8300-9005.5 Camco 5" Prod-F 04/17/91 #1 12100-12445 Camco 5" GR/CCL/Pre Frac 04/19/91 #1 8700-9178 Camco ~ 5" Gamma-Ray 04/24/91 #1 9300-9954 Camco 5' PITS 04/23/91 #1 1.0400-11190 Camco 5" Leak Det. 04/26/91 #1 9500-9750 Camco 5" Prod-F 04/18/91 #1 10100-10553 Camco 5" Jewelry 04/23/91 #1 9900-11000 Camco. 5" Temp 04/27/91 #1 3000-13132 Camco 5" Gas Entry Survey 04/17/91 #1 11100-11521 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES MAY 2 0 1991 Alaska 011 & Oas Cons. Commission ~ch0rage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519.6612 (907) 561-5111 TO: DISTRIBUTION Date :04/25/91 T#:82371 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, Please contact BP Well Records at (907) 564-4445. -22 '' 2 P-19 Completion 04/21/91 #1 9540-10340 Sch 5" CET 04/21/91 #1 9087-9820 Sch 5" CBT 04/21/91 #1 9087-9797 Sch 5" CET 04/22/91 #1 8900-9647 Sch 5" CBT 04/22/91 #1 8900-9623 Sch 5" Completion 04/20/91 #1 9740-10184 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2960' SNL, 2950' WEL, SEC. 31, T11N, R13E At top of productive interval 276' SNL, 1302' WEL, SEC. 6, TION, R13E At effective depth 482' SNL, 1266' WEL, SEC. 6, TION, R13E At total depth 564' SNL, 1247' WEL, SEC. 6, TION, R13E 12. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Stimulate Plugging Alter casing Repair well 5, Type of Well: Development X Exploratory S~'atlgraphlc Service 10360'feet Plugs (measured) true vertical 9271feet measured 10236'feet Junk (measured) true vertical 91801eet Length Size Cemented 110 20 2654 10-3/4" 3720 c.f 9732 7-5/8" 1392 c.f measured 829 5-1/2" 182 c.f Perforate × Other 6. Datum elevation (DF or KB) 91.90 AMSL feet 7, Unit or Property name Prudhoe Bay Unit 8, Well number P-19 (41-06-10-13) 9. Permit number/approval number 9O- 136/N/A 10. APl number 50- 029-22094 11. Field/Pool Prudhoe Oil Pool Measured depth True vertical depth BKB 146 146 2680 2588 9768' 7381 9531-10360 7236- 7733 9980'- 10020', 10032-10075', 9942'- 9952',9962'- 9990 true vertical subsea 7485-8969 (four intervals) Tubing (size, grade, and measured depth) 4-1/2" 12.6~ 1-80 @9534 Packers and SSSV (type and measured depth) TlWpacker@ 9440' SSS V @ 2090' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Re_oresentative Daily Averaoe Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 780 409 39 620 205 840 469 33 657 209 Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run. Daily Report of Well Operations ... 16. Status of well classification as: Oil × Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. .Form 10-404 Rev 06/15/88 ~ Date SUBMIT IN DUPLICATE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION OR IG IN A WELL COMPLETION OR RECOMPLETION REPORT AND LOG ;1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] _ 2. Name of Operator 7. Permit Number BP Exploration 90-136 3. Address 8. APl Number P. O. Box 196612, Anchorage, A/aska 99519-6612 5o- 029-22094 4. Location of well at surface 9. Unit 0r Lease Name 2960' SNL, 2950' WEL, SEC. 31, T11N, R13E.~: ,'_:i~;,.'.,i:~i.~ ~'~,~?~ ~ '= ....... ~= = '''~ Prudhoe Bay Unit At Top Producing Interval ! ''r.', ..--*~ :t :~'--- '-' -- 10. Well Number 276'SNL, 1302'WEL, SEC. 6, T10N, R13E P-19.(.4.1-06-10-13) At Total Depth ,/~ ;~ i :¢u~.~,,ll Prudhoe Bay Field/Prudhoe Bay Pool 564' SNL, 1247' WEL, SEC. 6 TION, R13E 5~' EleVation in feet (i'ndicate KB, DF, etc.) [6. Lease Designation and Sedal No. 91.9' KBE I ADL 28289 12. Date Spudded 13. Bate T.D. Reached 14. Date Comp., Susp. or Ab~nd. 115. Water Depth, it ollshore J16. No. of Completions 10-09-90 10-22-90 12-29-90I N/A feet MSL I One 17. Total Depth (MD+TVB) 18. Plug Back Depth (MD+TVD)19. Directional 'Survey 120. Depth where SS~V set 121. Thickness of Permatrost 10360' MD/g271' TVD 10236' MD/9180' TVD YES [] NO [] .J . 2090feet MD I 19.85' 2'~. 'Type Eleciri(~ or Other Logs Run ' ' DI .~. MSFL/GR/SP/BHC, LO T/CNL/HFFGR · . 23. CASING, LINER AND CEMENTING RECORD ., SETflNG DEPTH MD CASING SIZE WT. PER FT. GPA. DE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Cond. Surface 110' 10-3/4" 45.5# L-80 Surface 2680' 13-1/2" 3720 cuft Permafrost ..... 7-5/8" 29. 7# NT95HS Surface 9768' 9-7/8" 1392 cufl Class G 5-1/2" 17# NTsOS' ' 9531' 10360' 6-3/4" 182 cufl Class 'G , .... , 24. 'Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD " interval, size and number) SIZE DEPTH SET (MDI PACKER SET (MD/ Schlumberger 3-3/8" @ 4 spf 4-1/2" 12.6# 9534' 9440' MD TVDSS L-80 9980'- 10020' 8896'- 8927' 2~. ACID, FRACTURE, CEMENT SQUEF'2;E, ETC. 10032' - 10075' 8936'- 8969' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL LLS~D 10-3~4" X 7-5/8" Do~vnsqueezed annulus with ' ' ' annulus 150 bbls Dry Crude ,, ,, 27. PRODUCTION TEST Date First Production IMethod ol Operation (Flowing, gas lilt, etC.) f2-30-90 IF/owing. Date of 'Test Hours Tested PRODUCTION FOR OlL-BBL GAS-MCF ¢VATER-BBL CHOKE SIZE IGAS-OIL'RATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED :DIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DAT,~' Brief description of ,ithology, porosity, fractures, apparent dips, and presenc_~ of oil, . MAR - ~ 199~ . . Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate . .. GEOLOGIC MARKERS FOmrv~TION TESTS =, NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. ,, , Shublik A 9791' 8840' , Zone 4 9916' 8938' 31. LIsT OF A'I-i'ACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signe , Title PBU Lead Engineer Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: ,P, RUDHOE BAY UNIT As of 0600 Hrs. Thursday, October 1 !, 1990 WELL: F-38 (34-03-11-13~ AP! No. 50-029-22093 Day: 2 Depth at 0600 Hrs. = 24 Hour Footage = 1,233 Ft. 733 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost: Nab0r$ Rig #22-E 125305 Current Operation: Tripping for BHA change Sumrna~ry of Last 24. Hours: Drilled 17-1/2" hole to 1233' Mud Ty[~e Mud Weight Viscositv SpUd Mud 9.2 #/gal 218 Sec. ? V yP. Fluid Loss Solids Tem0 1 5 6 5 cc °F Survev .~ Angle N-S E-W Dog Leg TVD Section Coordinate Coordinate °!100' Alaska Oil & Gas Cons, Anchorage Reviewed By: MJS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday. October 10. 1990 WELL: F-35 (34-03-11-1~) APl No. 50-029-22093 Day: 1 Depth at 0600 Hrs. = 24 Flour Footage = 500 Ft. 390 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig #22-E 125305 Current Operation' Surveying. Summary_ of Last 24 Hours: Drilled the 17-1/2" hole to 500'. Mud Type Mud Weiaht -- #/gal Viscosity Sec. PV yp, Fluid Loss ~ Temp oF CC - Survey Depth Anale -- Direction .TVD N-S E-W Dog Leg Section Coordinate. Coordinate °/100' Reviewed By: ~' BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRIdDHOE BAY UNIT As of 0600 Hrs. Friday. October 12. 1990 WELL: F-38 (34-0:3-11-1~)~ AP! No. 50-029-22093 Day: 3 Depth at 0600 Hrs. = 24 Hour Footage = 2.500 Ft. 1,267 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig #22-E Current Operation' Running 13-3/8" casing. Summary of Last 24 Hours' Drill to 2500'. Run 13-3/8" casing. Mud Tv.De Mud Weight Viscosity Spud 9.5 #/gal 137 Sec. PV yP EJuid Loss Solids 16 30 0.0 cc 7.5% Temp oF Survey ~ Angle N-~; E-W Section Coordinate ,Coordinate Dog Leg o/100' Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Mc~nday, October 15. 1990 WELL: F-38 (31-03-11-13~ APl No. ~;0-029-22093 Day: .6. Depth at 0600 Hrs. = 72 Hour Footage = 2.510 Ft. 10 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Riq #22-E 1253O5 Current Operation: Drilling 12-1/4" hole. Summary of Last 72 Hours: Run and cement 13,3/8" casing. Test BOPs. Drill out cement. Mud Type Mud Weight Viscosity p V LSND 8.9 #/gal 33 Sec. 8 yP. Fluid Loss Solids Temo 2 12.0 cc 3% °F Sun/ev Deoth Anale Direction TVD N-S E-W Dgg Leg Section Coordinate Coordinate °/100' Reviewed By: ,~~_~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday. October 16, 1990 WELL: F-38 (31-03-11-13) APl No. 50-029-22093 Day: Z Depth at 0600 Hrs. = 24 Hour Footage --- 2.917 Ft. 407 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #22-E 1253O5 Current Operation: Tripping. St~mmary 9f Last ,24. Hours' Drill to 2917'. Trip for motor change. Mud Type Mud Weight Viscosity LSND 9.1 #/gal 35 Sec. p V yp. Fluid Loss Solids Temp 7 4 16.2 cc 6 % °F Survey Depth Angle Direction TVD N-$ E-W Dog Leg Section Coordinate Coordinate °/100; Reviewed By' I~'~"~:~._ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday. October 17, !990 WELL: F-38 (31-03-11-13) AP! No. 50-029-22093 Day:..8_ Depth at 0600 Hrs. = 24 Hour Footage = 4,035 Ft. 1,118 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nab0rs Rig #22-E 125305 Current Operation' POH. Summary of Last 24 Hours: Drill to 3527'. Trip for assembly change. Ddil to 4O35'. POH. .Mud Type Mud Weight Viscosity L.S. 9.1 #/gal 37 Sec. P V .YP. Fluid Loss .Solids Temo 7 5 12.0 cc ,..._ 5% °F ~ Depth Angle Direction TVD N-$ E-W Dog Leg Section Coordinate Coordinate 0/100! Reviewed By: MJ$ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursda, y, October 18. 1990 WELL: F-38 (31-03-11-13), AP! No. ~0-029-22093 Day: 9 Depth at 0600 Hrs. = 24 Hour Footage = 5,242 Ft. 1,207 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors, ,.Rig #22-E 125305 Current Operation' Drilling. Summary of Last 24 Hours: Trip for BHA change. Drill 12-1/4" to 5242'. Mud Tvae Mud Weiaht Viscosity LSND 9.3 #/gal 39 Sec. ? V YP Fluid Loss Solids Temp 9 7 9.8 cc 7% 78 °F Survey Death Angle Direction TVD N-$ E-W Dog Leg Section .Coordinate Coordinate °/100' Reviewed By: MJ$ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRIJDHOE BAY UNIT As of 0600 Hrs. Friday. October 19, 1990 WELL: F-38 f31-03-11-13) APl No. 50-029-22093 Day' 1 0 Depth at 0600 Hrs. = 24 Hour Footage = 5,894 Ft. 652. Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #22-E 1253O5 Current Operation: Drilling. Summary_ of Last 24 Hours' Drilled to 5305'. Tdp for BHA change. Drill to 5894'. Mud Type Mud Weight Viscosity LSND 9.3 #/gal 40 Sec. P, V YP Fluid Loss Solids Temp 9 8 10.0 cc 7% °F Survey Death E-W. Dog Leg TVD Sectioq Coordinate Coordinate °/100' Reviewed By' MJ,.¢ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday. October 22, 1990 WELL: F-3.$ (31-03-11-13) APl No. ~0-029-22093 Day: 13 Depth at 0600 Hrs, = 72 Hour Footage = 7,815 Ft. ,120 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #22-E 125305 Current ODeration: Tripping. Summary of Last 72 Hours: Drill to 12-1/4" to 7815'. Mud Type MSNO Mud Weight 9.3 #/gal Viscosity 38 Sec. p¥ yP Fluid Loss SQlids Temp 1 1 9 5.2 cc 7% °F Survey Deoth Anale TVD N-$ E-W Dog Leg Section Ooordinate Coordinate °/100' Reviewed By: MJS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday. October 23. 1990 WELL: F-~$ (~1-0~-11,-13) AP! No. ~0-029-22093 Day' 1 4 Depth at 0600 Hrs. = 24 Hour Footage = 7,954 Ft. 1,.14 Ft. Rig: AFE Number: AFE Amount = Current Costs -- Estimated Final Cost = Nabors Rig #22-E 125305 Current Operation: Tripping. Summary of Last 24 Hours: Ddll to 7954'. Trip for assembly change. Mud Type ,, Mud Weight MSND 9.3 Cf/gal Viscosity . 39 Sec. P¥ YP Fluid Loss Solids Tem.o 1 1 16 5.4 cc 5% °F Survey ~ n~¢.¢¢. N-$ E-W. ~ TVD Section Ooordinate Ooo. rdinat~ °/100, Reviewed By' MJ$ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, October 24. 1990 WELL: F-38 (31-03-11-13~ AP! No. 5O-O29-22O93 Day: 1 5 Depth at 0600 Hrs. = 24 Hour Footage = 8,800 Ft. 849 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = ,Nabor,.s Rig #22-E 125305 Current OperatiQn: Drilling. Summary of Last 24 H0ur~: Drill 12-1/4" hole to 8492'. Trip for assembly change. Trip to 8800'. Mud Tyoe Mud Weight Viscosity P V YP LSND 9.5 #/gal 35 Sec. 1 2 7 Fluid Loss Solids Tem,o 5.6 cc 6% °F Survey D_EE~ Angle Directiorl TVD N-$ E-W Dod Leq Section Coordinate Coordinate °/100' Reviewed By: MJS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday. October 25, 1990 WELL: F-38 (31-03-11-13) AP! No. 50-029-22093 Day: 1 6 Depth at 0600 Hrs. = 24 Hour Footage = 9.354 Ft. 554 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig #22-E 1253O5 Current Operation' Drilling. Summary of Last 24 Hours: Drill to 9328'. Trip to pick up motor. Drill to 9354'. Mud Type Mud Weight Viscosity LSND 9.6 #/gal 37 Sec. pv YP Fluid Loss Solids Temo 1 1 5 5.8 cc 7% °F Survey Depth Angle Direction N-S E-W Doq Leg TVB Section Coordinate Coordinate °/100' Reviewed By' MJS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: P. RU, DHOE BAY UNIT As of 0600 Hrs. Friday. October 26. 1990 WELL: F,-,38 (31-03-1,1-13~ APl No. ~0-029-22093 Day' 1 7 Depth at 0600 Hrs. = 24 Hour Footage = 9.940 Ft. 586 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor~; Rig #22-E 125305 Current Operation' Drilling. Summary of Last .2 .4 Hours' Drill to 9446'. Trip for assembly change. Drill to 9940'. Mud Tv.De Mud Weight Viscosity LSND 9.6 #/gal 38 Sec. P V ,YP, Fluid Loss Solids Temp 1 1 7 5.6 cc 7% °F Survey D..e. Et.b Angle J2LEe,.6tJ.g.E TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: MJS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday. October 29. 1990 WELL: F-38 (31-03-11-13), APl No. 50-029-22093 Day: 20 Depth at 0600 Hrs. = 72 Hour Footage = 10,095 Ft. 155 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig #22-E 125305 Current Operation: Tripping in with 8-1/2" BHA. Summary. of Last 72 Hours: Drill to 10,095'. Run logs. Run and cement 9-5/8" Casing. RIH to drill out. Mud Type Mud Weight Viscosity LSND 9.0 #/gal 35 Sec. PV YP. Fluid Loss Solids 7 4 8.8 cc 5% Temr Survey Depth Angle Direction TVD N-S E-W Section Coordinate Coordinate Dog. Le[ °/10C Reviewed By: MJS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRI. JDHOE BAY UNIT As of 0600 Hrs. Tuesday. October 30. 1990 WELL: F-38 (31-03-11-13~ APl No. 50-029-22093 Day: 21 Depth at 0600 Hrs. = 10.720 Ft. 24 Hour Footage = 625 Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #22-E 125305 Current Operation' Tripping. Summary of Last 24 Hours' Drill out 9-5/8" shoe. Ddil 8-1/2" to 10720' TD. POH. Mud Type Mud Weight ~iscosit¥ LSND 8.8 #/gal 35 Sec. ? ¥ YP Fluid Loss Solids Temp 9 7 10.2 cc 5% °F Survey Depth ,Artgle D_J.EEqt[~ N-$ E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By' MJ$ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT. As of 0600 Hrs. Wednesday. October 31, 1990 WELL: F-38 (31-03-11-13~ APl No. 50-O29-22O93 Day' 22~ Depth at 0600 Hrs. = 10,720 Ft. 24 Hour Footage = _0. Ft. Rig: AFE Number: AFF: Amount = Current Costs = Estimated Final Cost = Nab0r$ Rig #22-E 125305 Current Operation' RIH with 7" liner. Summary of Last 24 Hours' Ran open hole logs. Ran wiper trip and circulated bottom up. Rig up and run 7" liner. Mud Type Mud Weight Viscosity P V LSND 8.9 Cf/gal 34 Sec. 5 yP Fluid Loss Solids Temo 8 10.4 cc 5% 92 °F Survey Depth Angle Direction TVD N-$ E-W Doq Leg Section Coordinate Coordinate °/100' Reviewed By: dh BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UN!,T. As of 0600 Hrs. Thursday, November 1, 1990 WELL: F-38 (31-03-11.13) APl No. 50-029-22093 Day: 23. Depth at 0600 Hrs. = 10.720 Ft. 24 Hour Footage = 0 Ft. Rig: AFE Number: AFE Amount = Current Costs- Estimated Final Cost = Nabors Ria #22-E -- 125305 Current OperatiQn' TIH w/8-1/2" bit. Summary. of Last 24, Hours' Ran and cemented 7" liner. POOH with liner running tool. JV!,ud Type Mud Weight Viscosity LSND 8.9 #/gal 34 Sec. PV YP Fluid Loss Solids 8 5 10.5 cc 5% Survey Depth Angle DirectiQn TVD N-S E-W Dog Leg Secti~)r~ Coordinate Coordinate 0/100! Reviewed By: MJS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Friday, November 2, 1990 WELL: F-38 (31-03-11-13} AP! No. 50-029-22093 Day: 24 Depth at 0600 Hrs. = 24 Hour Footage = 10,720 Ft. O Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = NcbQr$ Rig #22-E 125305 Current Operation: Displacing mud with brine water. Summary of Last 24 Hours: Cleaned out cement inside of liner to float collar (10678' MD). Tested 5-1/2" liner to 3000 psi, ok. Pumped away excess mud down 13-3/8" x 9-5/8" annulus. MudType Mud Weight ,Viscosity P V YP Fluid Loss Solids Temp LSND 9.0 #/gal 48 Sec. 1 2 7 20.0 cc 6% °F Survey Depth Angle Direction 'D/D N-$. E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: dh BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, November 5. 1990 WELL: F-38 (31-03-11-1~), APl No. 5O-029-22O93 Day: 2,6. Depth at 0600 Hrs. = 10,720 Ft. 72 Hour Footage = O Ft. Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #22-E 1253O5 Current Operation: Rig released @ 1430 hrs, 11-4-90. Summary_ of Last 72 Hours: Displaced mud with completion fluid. Ran 4-1/2" tubing. Freeze protected tubing annulus with diesel. Pressure tested tubing annulus to 2500 psi, ok. Freeze protected casing annulus with diesel. Cleaned up the pit and released the rig @ 1430 hrs, 11-4-90 for F-39. Mud Type Mud Weight yiscosity P V YP. Fluid Loss Solids Temp Brine 8.6 #/gal Sec. cc °F Survey, Depth. Angle Direction .N-S E-w. Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: ¢'h .A SUB.$URFACE DIRECTIONAL $URVEY F~UIDANCE [~]ONTINUOUS FfIOoL Alaska Oil .& Gas Co~s. Commission's. ;~nchora§o Company Well Name Field/Location BP EXPLORATION P-19 (2319' NSL,2057' EWL,SEC 31,T11N,R13E) PRUDHOE BAY, NORTH SLOPE, ALASKA Job Reference No. 74266 Logged By: JOHNSON Date 16-DEC-90 Computed By: KRUWELL * SCHLUMBERGER * , * ******************** GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION P-19 (41-06-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA SURVEY DATE: 16-DEC-1990 ENGINEER: G. JOHNSON METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- Avecaged deviation amd azimuth INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 31 DEG 18 MIN EAST BP EXPLORATION P-19 (41-06-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 O0 7O0 O0 800 O0 900 O0 0.00 lO0.O0 200.00 300.00 40O O0 500 O0 600 O0 700 O0 799 99 899 99 COMPUTATION DATE: 31-DEC-90 PAGE 1 DATE OF SURVEY: 16-DEC-1990 KELLY BUSHING ELEVATION: 91.90 FT ENGINEER: G. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH 0 0 N 0 0 E 0 13 S 14 35 E 0 11 S 11 45 E 0 11 S 26 37 E 0 10 S 27 14 E 0 11 S 22 37 E 0 15 S 23 49 E 0 17 S 29 16 E 0 17 S 18 57 E 0 18 S 6 3 E 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 999 99 O0 1099 O0 1199 O0 1299 O0 1399 O0 1499 O0 1599 O0 1699 O0 1799 O0 1899 -91 90 810 108 10 208 10 308 10 408 10 508 10 608 10 708 09 808 09 0 9 S 31 37 E 0 15 S 74 31 E 0 19 S 59 51 E 0 16 S 39 5 E 0 18 S 12 28 W 0 15 S 33 27 E 0 21 S 14 41 W 0 11 S 10 17 W 0 19 S 30 13 E 0 21 S 26 20 E 908.09 99 1008.09 99 1108.09 99 1208.09 99 1308.09 99 1408.09 99 1508.09 99 1608.09 98 1708.08 98 1808.08 2000 O0 1999 98 1908 08 O0 2099 O0 2199 O0 2299 O0 2399 O0 2499 O0 2599 O0 2699 O0 2799 O0 2899 98 2008 98 2108 97 2208 96 2308 95 2408 94 2508 92 2608 91 2708 90 2808 O8 O8 O7 O6 O5 O4 02 01 O0 0 15 S 43 47 E 022 S 9 9 E 0 31 S 30 46 E 0 39 S 31 14 E 0 47 S 26 0 E 0 58 S 17 30 E 1 0 S 19 45 E 1 0 S 21 51 E 0 58 S 18 1 E 0 54 S 14 58 E 2100 2200 2300 2400 2500 2600 2700 2800 2900 3000 O0 2999.88 2907.98 O0 3099.87 3007.97 O0 3199.86 3107.96 O0 3299.85 3207.95 O0 3399 84 3307'.94 O0 3499 84 3407.94 O0 3599 83 3507.93 O0 3699 83 3607.93 O0 3799 83 3707.93 O0 3899 83 3807.93 0 49 S 11 19 E 0 51 S 4 22 E 0 50 S 8 55 W 0 47 S 16 44 W 0 40 S 37 0 W 0 36 S 47 36 W 0 26 S 60 36 W 0 25 S 62 23 W 0 12 S 30 27 W 0 13 S 5 2 E 3100 3200 3300 3400 3500 3600 3700 3800 3900 FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 0 2O 051 0 83 1 12 1 45 1 81 2 25 2 74 3 2O 3 58 3 83 4 25 4 70 5 19 5 51 601 631 6 72 731 791 8 37 9 13 10 10 11 35 12 84 14 51 16.23 17.91 19.43 2O 90 22 24 23 49 24 50 25 20 25 52 25 60 25 54 25 60 25 88 0 O0 0 04 0 O0 0 O0 0 O0 0 O0 0 15 0 O0 0 O0 0 11 0 25 0 O0 O01 0 16 0 36 012 015 015 0 28 0 O0 0 25 0 O0 0 82 0 O0 0 12 0 04 012 0 O0 0 43 0 O0 0 30 0 02 016 0 O0 012 0 O0 0 O0 0 O0 0 O8 0 O0 0.00 N 0.17 S 0.50 S 0 81 S 1 06 S 1 36 S 1705 2 10 S 2545 301 S 3.4O S 3.50 S 3.70 S 4.00 S 4.5O S 4.82 S 5.33 S 5.77 S 6.10 S 6.64 S 7.16 S 7565 8325 9125 10 23 S 11 61 S 13 25 S 14.89 S 16.45 S 17.98 S 19.48 S 20.90 S 22.39 S 23.77 S 24 92 S 25 74 S 26 27 S 26 61 S 26 96 S 27 30 S 0 O0 E 0 11 E 0 17 E 0 28 E 041 E 0 55 E 0 68 E 0 89 E 1 09 E 1 20 E 1 30 E 1 61 E 2 09 E 2 47 E 2 58 E 2 69 E 2 80 E 2 66 E 2 90 E 3 16 E 3 45 E 3 67 E 3 89 E 4 43 E 5 03 E 5 62 E 6 14 E 6.76 E 7.41 E 7.83 E 8 19 E 8 43 E 8 40 E 8 07 E 7 53 E 6 78 E 6 06 E 5 40 E 493 E 4 92 E 0 O0 N 0 0 E 20 S 33 15 E 53 S 18 24 E 85 S 18 53 E 14 S 21 3 E 47 S 21 58 E 83 S 21 43 E 28 S 23 1 E 76 S 23 15 E 24 S 21 45 E 3 64 S 20 59 E 85 S 24 47 E 25 S 29 28 E 70 S 31 44 E 19 S 29 52 E 52 S 29 9 E 02 S 27 44 E 35 S 24 46 E 75 S 25 24 E 35 S 25 26 E 7 94 S 25 44 E 8 41 S 25 53 E 9 19 S 25 4 E 10 14 S 25 55 E 11 40 S 26 10 E 12 90 S 25 48 E 14 60 S 24 53 E 16.35 S 24 25 E 18.04 S 24 15 E 19.61 S 23 32 E 21.13 S 22 48 E 22.54 S 21 58 E 23.91 S 20 34 E 25.10 S 18 45 E 26 03 S 16 48 E 26 62 S 14 45 E 26 96 S 12 59 E 27 15 S 11 29 E 27 41 S 10 22 E 27 74 S 10 13 E COMPUTATION DATE: 31-DEC-90 PAGE 2 BP EXPLORATION P-19 (41-06-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 16-DEC-1990 KELLY BUSHING ELEVATION: 91.90 FT ENGINEER: G. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUT~ DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 3999.83 3907.93 1 5 S 25 42 E 4100 4200 4300 4400 4500 4600 4700 4800 4900 O0 4099.67 4007.77 4 27 S 29 54 E O0 4199.21 4107.31 6 46 S 26 52 E 41 O0 4298.16 4206.26 9 45 S 32 8 E 55 O0 4396,22 4304 32 12 58 S 36 7 E 75 O0 4492.91 4401 01 16 27 S 38 4 E 100 O0 4587.82 4495 92 20 25 S 37 54 E 131 O0 4680.06 4588 16 24 25 S 40 47 E 169 O0 4770,19 4678 29 26 57 S 41 27 E 212 O0 4858.26 4766 36 29 31 S 41 53 E 259 26.56 31 87 36 73 25 57 77 94 60 17 3.49 2.63 3.39 3.69 4.06 2.85 5.24 2.55 2.61 2.31 27 96 S 5.15 E 28.43 S 10 26 E 32 53 S 7.84 E 33,46 S 13 33 E 41 02 S 12.15 E 42.78 S 16 30 E 53 44 S 19 37 E 56.85 S 19 56 E 69 65 S 30 28 E 75.95 S 23 30 E 89 92 S 45 69 E 100.86 S 26 56 E 114.66 S 65 07 E 131.83 S 29 34 E 144.41 S 89 60 E 169.94 S 31 49 E 177.01 S 118 09 E 212.79 S 33 43 E 212.38 S 149 56 E 259.76 S 35 9 E 5000.00 4944.28 4852.38 31 43 S 42 21 E 309 26 5100.00 5028.33 4936.43 33 56 S 43 4 E 362 37 5200.00 5110.42 5018.52 35 28 S 43 40 E 418 19 5300.00 5191 93 5100 03 35 20 S 44 17 E 474 71 5400.00 5273 58 5181 68 35 9 S 44 34 E 530 94 5500.00 5355 25 5263 35 35 26 S 44 37 E 587 10 5600.00 5436 86 5344 96 35 17 S 44 57 E 643.29 5700.00 5518 35 5426 45 35 32 S 45 3 E 699.60 5800.00 5599 58 5507 68 35 46 S 45 13 E 756.24 5900.00 5680 82 5588 92 35 31 S 45 42 E 812.78 1 97 2 34 0 52 0 42 0 27 0 57 041 0 24 0 34 0 30 250.23 S 183 73 E 310 44 S 36 17 E 290.07 S 220 331.52 S 259 373.21 S 299 414.44 S 340 455.53 S 380 496.54 S 421 537.52 S 462 578.69 S 503 619.62 S 545 44 E 364 70 E 421 93 E 478 34 E 536 86 E 593 58 E 651 55 E 709 88 E 767 39 E 825 32 S 37 14 E 13 S 38 4 E 79 S 38 47 E 28 S 39 24 E 77 S 39 54 E 37 S 40 20 E 15 S 40 43 E 31 S 41 3 E 46 S 41 21 E 6DO0 O0 5762.32 5670 42 35 14 S 46 16 E 868.85 6100 6200 6300 640O 6500 6600 67OO 6800 6900 O0 5844.27 5752 37 34 39 S 46 36 E 924.17 O0 5926.75 5834 85 34 13 S 47 7 E 978.65 O0 6009.60 5917 70 33 48 S 47 28 E 1032.48 O0 6092.97 6001 07 33 16 S 47 30 E 1085.50 O0 6177.01 6085 11 32 26 S 47 16 E 1137.59 O0 6261.56 6169 66 32 6 S 46 47 E 1188.97 O0 6346.62 6254.72 31 19 S 45 50 E 1239.75 O0 6432.21 6340.31 31 3 S 44 36 E 1289.94 O0 6517.95 6426.05 30 51 S 42 56 E 1340.20 0.54 0.54 0.52 0.64 0.52 O.54 0.73 0.76 0.77 0.94 659.89 S 587.07 E 883 24 S 41 39 E 699.40 S 628.57 E 940 738.08 S 669.82 E 996 776 07 S 710.95 E 1052 813 37 S 751.68 E 1107 850 08 S 791.55 E 1161 886 44 S 830.65 E 1214 922 76 S 868.68 E 1267 959 16 S 905.40 E 1318 996 35 S 940.99 E 1370 36 S 41 57 E 71 S 42 13 E 49 S 42 30 E 52 S 42 45 E 55 S 42 57 E 81 S 43 8 E 32 S 43 16 E 99 S 43 21 E 46 S 43 22 E 7000 O0 6603 93 6512.03 30 33 S 41 25 E 1390 34 7100 7200 7300 7400 7500 7600 7700 7800 7900 O0 6690 O0 6776 O0 6863 O0 6950 O0 7037 O0 7123 O0 72O6 O0 7288 O0 7371 16 6598 26 30 21 S 40 7 E 1440 55 6684 20 6771 35 6858 57 6945 10 7031 23 7114 98 7197 94 7280 65 30 10 S 38 54 E 1490 30 29 43 S 37 16 E 1539 45 28 59 S 34 55 E 1588 67 30 7 S 33 56 E 1637 20 32 27 S 33 30 E 1689 33 34 32 S 33 58 E 1744 08 33 42 S 32 59 E 1800 30 14 71 57 40 15 68 77 04 34 36 S 31 56 E 1856.60 0.80 1034.20 S 975 25 E 1421.50 S 43 19 E 1 07 1072.58 S 1008 81 1111,41 S 1040 15 1150.69 S 1071 22 1190.30 S 1100 43 1230.71 S 1127 33 1273.78 S 1156 11 1320.02 S 1187 93 1366.81 S 1218 01 1413.94 S 1248 29 E 1472.10 S 43 14 E 34 E 1522.35 S 43 6 E 16 E 1572.09 S 42 57 E 06 E 1620.79 S 42 45 E 60 E 1669.17 S 42 30 E 39 E 1720.39 S 42 14 E 20 E 1775.36 S 41 58 E 23 E 1830.91 S 41 43 E 17 E 1886.04 S 41 26 E COMPUTATION DATE: 31-DEC-90 PAGE 3 BP EXPLORATION P-19 (41-06-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 16-DEC-1990 KELLY BUSHING ELEVATION: 91.90 FT ENGINEER: G. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG MIN 8000 O0 7453 28 7361.38 36 25 8100 8200 8300 8400 8500 8600 8700 8800 890O O0 7533 O0 7614 O0 7694 O0 7774 O0 7853 O0 7930 O0 8006 O0 8080 O0 8154 69 7441 79 36 23 36 7522 96 7603 71 7682 29 7761 55 7838 35 7914 51 7988 09 8062 46 36 5 06 36 35 81 37 4O 39 38 49 65 39 59 45 41 30 61 42 29 19 42 48 S 31 46 E 1914 75 S 30 31 E 1974 S 29 16 E 2033 S 28 17 E 2092 S 27 6 E 2152 S 26 1 E 2214 S 25 3 E 2277 S 24 7 E 2342 S 23 1 E 2408 S 22 50 E 2475 20 27 40 61 24 40 17 62 62 0 92 1 34 0 23 1 13 1 27 1 24 1 39 2 10 051 0 83 1463 34 S 1278 84 E 1943 40 S 41 9 E 1514 1565 1617 1670 1726 1783 1842 1904 1966 17 S 1309 46 S 1339 33 S 1367 77 S 1395 11 S 1423 40 S 1450 72 S 1477 27 S 1504 64 S 1530 68 E 2001 03 E 2060 54 E 2118 53 E 2176 15 E 2237 49 E 2298 60 E 2361 28 E 2426 65 E 2492 99 S 40 51 E 01 S 40 33 E O0 S 4O 13 E 92 S 39 52 E 14 S 39 30 E 79 S 39 7 E 97 S 38 43 E 74 S 38 18 E 10 S 37 54 E 9000.00 8227 80 8135.90 42 15 9100.00 8302 9200.00 8378 9300.00 8455 9400 O0 8534 95O0 O0 8612 9600 O0 8691 9700 O0 8769 9800 O0 8847 9900 O0 8925 38 8210.48 41 12 25 8286.35 40 5 68 8363 78 38 14 35 8442 45 38 27 76 8520 86 38 17 18 8599 28 38 32 38 8677 48 38 32 29 8755 39 39 5 39 8833 49 37 57 S 21 22 E 2542 34 S 19 28 E 2607 76 S 16 36 E 2671 17 S 13 7 E 2731 89 S 11 1E 2790 12 S 8 34 E 2847 88 S 5 49 E 2904.50 S 3 7 E 2960.15 S 1 11 E 3014.69 S 3 50 E 3069.26 1 39 1 97 2 64 2 58 1 98 1 62 1 74 1 90 1 O0 3 63 2029.23 S 1556 13 E 2557.21 S 37 29 E 2091.62 S 1579 45 E 2620.98 S 37 3 E 2153.53 S 1599 69 E 2682.67 S 36 36 E 2214.66 S 1616 02 E 2741 58 S 36 7 E 2275.03 S 1628 81 E 2798 O0 S 35 36 E 2336.19 S 1639 41 E 2854 02 S 35 4 E 2397.74 S 1647 17 E 2909 O0 S 34 29 E 2459.87 S 1652 09 E 2963 17 S 33 53 E 2522.52 S 1654.04 E 3016 45 S 33 15 E 2584.91 S 1656.45 E 3070 12 S 32 39 E 10000.00 9003.71 8911.81 39 26 10100.00 9079.90 8988.00 41 14 10200'.00 9154.02 9062.12 43 11 10300.00 9226.91 9135.01 43 12 10360.00 9270.65 9178.75 43 12 S 8 13 E 3125.57 S 10 51 E 3185.75 S 13 15 E 3249.08 S 13 18 E 3314.32 S 13 18 E 3353.38 2.87 2.42 5.36 0.00 0.00 2646.70 S 1663.21 E 3125.91 S 32 9 E 2710.55 S 1674.05 E 3185.83 S 31 42 E 2776.21 S 1687.97 E 3249.08 S 31 18 E 2842.92 S 1703.81 E 3314.39 S 30 56 E 2882.90 S 1713.26 E 3353.56 S 30 43 E COMPUTATION DATE: 31-DEC-90 PAGE 4 BP EXPLORATION P-19 (41-06-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEV: 16-DEC-1990 KELLY BUSHING ELEVATION: 91.90 FT ENGINEER: G. JOHNSON INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 1000 O0 999 2000 O0 1999 3000 O0 2999 4000 O0 3999 5000 O0 4944 6000 O0 5762 7000 O0 6603 8000 O0 7453 9000 O0 8227 0 O0 -91.90 0 0 99 908.09 0 9 98 1908.08 0 15 88 2907.98 0 49 83 3907 93 1 5 28 4852 38 31 43 32 5670 42 35 14 93 6512 03 30 33 28 7361 38 36 25 80 8135 90 42 15 N 0 0 E S 31 37 E 3 S 43 47 E 7 S 11 19 E 20 S 25 42 E 26 S 42 21 E 309 S 46 16 E 868 S 41 25 E 1390 S 31 46 E 1914 S 21 22 E 2542 0 O0 58 91 90 56 26 85 34 75 34 0 O0 0 25 0 25 0 3O 3 49 1 97 0 54 0 80 0 92 1 39 0 O0 N 3 7 19 27 250 659 1034 1463 2029 40 S 1 16 S 3 48 S 8 96 S 5 23 S 183 89 S 587 20 S 975 34 S 1278 23 S 1556 0 O0 E 0.00 N 0 0 E 30 E 3.64 S 20 59 E .45 E 7.94 S 25 44 E 19 E 21.13 S 22 48 E 15 E 28.43 S 10 26 E 73 E 310.44 S 36 17 E 07 E 883.24 S 41 39 E 25 E 1421.50 S 43 19 E 84 E 1943.40 S 41 9 E 13 E 2557.21 S 37 29 E 10000.00 9003.71 8911.81 39 26 S 8 13 E 3125.57 10360.00 9270.65 9178.75 43 12 S 13 18 E 3353.38 2.87 2646.70 S 1663.21 E 3125.91 S 32 9 E 0.00 2882.90 S 1713.26 E 3353.56 S 30 43 E COMPUTATION DATE: 31-DEC-90 PAGE 5 BP EXPLORATION P-19 (41-06-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 16-DEC-1990 KELLY BUSHING ELEVATION: 91.90 FT ENGINEER: G. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 91 90 191 9O 291 90 391 9O 491 90 591 90 691 9O 791 91 891 91 0 O0 91 90 191 9O 291 90 391 9O 491 90 591 9O 691 9O 791 90 891 90 -91.90 0 0 N 0 0 E 0.00 0 13 S 17 57 E 100.00 0 11 S 12 15 E 200.00 0 10 S 26 17 E 300.00 0 10 S 29 8 E 400.00 0 11 S 24 18 E 500.00 0 14 S 22 6 E 600.00 0 16 S 29 5 E 700.00 0 17 S 19 8 E 800.00 0 17 S 5 52 E 0 O0 0 18 0 49 081 1 10 1 42 ~ 77 2 22 2 7O 3 16 0 O0 0 17 0 O0 0 O0 0 O0 0 O0 0 O4 0 O0 0 O0 0 03 0.00 N 0.14 S 0.48 S 0 78 S 1 04 S 1 34 S 1 67 S 2065 2 50 S 2.97 S 0.00 E 0.10 E 0.16 E 0.26 E 0 40 E 0 54 E 0 66 E 0 87 E 1 08 E 1 20 E 0 O0 N 0 0 E 18 S 36 11 E 50 S 18 43 E 83 S 18 39 E 12 S 20 54 E 44 S 21 56 E 80 S 21 41 E 24 S 22 55 E 72 S 23 18 E 20 S 21 57 E 991 91 1091 1191 1291 1391 1491 1591 1691 1791 1891 91 1091.90 1000 91 1191.90 1100 91 1291.90 1200 91 1391.90 1300 91 1491.90 1400 91 1591.90 1500 91 1691.90 1600 .92 1791.90 1700 991.90 900 O0 O0 O0 O0 O0 O0 O0 O0 O0 92 1891.90 1800.00 0 9 S 25 24 E 0 15 S 76 54 E 0 19 S 60 40 E 0 16 S 41 37 E 0 19 S 8 19 W 0 15 S 33 52 E 0 21 S 11 27 W 0 12 S 13 20 W 0 19 S 34 3 E 0 21 S 26 42 E 3.56 3.80 4.21 4.66 5.15 5.48 5.97 6.29 6.67 7.26 0 O9 0 O0 0 O0 0 07 0 29 0 O8 018 0 23 0 4O 0 O0 3 38 S 3 49 S 3 68 S 3975 4 46 S 4795 5 28 S 5 74 S 6065 6595 1.29 E 1.58 E 2.05 E 2.45 E 2 59 E 2 67 E 281 E 2 67 E 2 87 E 3 13 E 3.62 S 20 57 E 3.83 S 24 23 E 4.22 S 29 9 E 4.66 S 31 4O E 5.15 S 30 10 E 5.48 S 29 8 E 5.98 S 28 1 E 6.33 S 24 54 E 6.71 S 25 21 E 7.30 S 25 26 E 1991 92 1991.90 1900.00 2091 2191 2291 2391 2491 2591 '2691 2791 2892 0 16 92 2091.90 2000.00 0 23 92 2191 90 2100.00 0 32 93 2291 90 2200.00 0 39 93 2391 90 2300.00 · 0 47 95 2491 90 2400.00 0 58 96 2591 90 2500.00 0 59 98 2691 90 2600.00 1 0 99 2791 90 2700.00 0 59 O0 2891 90 2800.00 0 54 S 39 42 E S 8 9 E S 24 53 E S 31 51 E S 26 20 E S 18 18 E S 19 9 E S 21 40 E S 20 6 E S 14 53 E 7 87 8 32 9 O6 10 01 11 24 12 71 14 37 16 09 17 77 19 31 0 62 0 O0 0 89 0 O0 0 O4 016 0 O6 0 O0 0 59 0 O0 7.13 S 7.51 S 8.26 S 9.04 S 10.13 S 11.48 S 13.11 S 14.76 S 16.32 S 17.86 S 3.43 E 3.66 E 3.86 E 4.38 E 4.98 E 5.57 E 6.10 E 6.70 E 7.37 E 7.80 E 7 91 S 25 40 E 8 9 10 11 12 14 16 17 19 36 S 26 0 E 11 S 25 2 E 05 S 25 52 E 28 S 26 10 E 76 S 25 53 E 46 S 24 56 E 21 S 24 26 E 91 S 24 17 E 48 S 23 36 E 2992.01 2991.90 2900 O0 3092.03 3091,90 3000 3192.04 3191,90 3100 3292.05 3291.90 3200 3392.05 3391.90 3300 3492.06 3491.90 3400 3592.07 3591.90 3500 3692.07 3691.90 3600 3792.07 3791.90 3700 3892.07 3891.90 3800 0 51 O0 0 51 O0 0 51 O0 0 48 O0 0 40 O0 0 36 O0 0 26 O0 0 25 O0 0 13 O0 0 12 S 11 12 E S 5 6 E S 7 34 W S 16 20 W S 35 38 W S 47 3 W S 60 10 W S 62 57 W S 34 47 W S 9 43 E 2O 79 22 13 23 4O 24 43 25 17 25 50 25 60 25 55 25 59 25 85 0 40 0 O8 0 19 0 O0 0 27 0 O0 0 O0 0 O0 0 24 0 19 19 36 S 2O 78 S 22 27 S 23 66 S 24 84 S 25 69 S 26 24 S 26 58 S 26.94 S 27.27 S 8.17 E 8.42 E 8.41 E 8.10 E 7.58 E 6.84 E 6.11 E 5.45 E 4.95 E 4.91 E 21 01 S 22 52 E 22 23 25 25 26 26 27 27 27 42 S 22 3 E 81 S 20 42 E 01 S 18 54 E 97 S 16 58 E 58 S 14 55 E 94 S 13 7 E 14 S 11 36 E 39 S 10 25 E 71 S 10 13 E COMPUTATION DATE: 31-DEC-90 PAGE 6 BP EXPLORATION P-19 (41-06-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 16-DEC-1990 KELLY BUSHING ELEVATION: 91.90 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 21 4091 64 4191 65 4291 57 4391 95 4491 37 4591 02 4691 44 4791 84 4891 0 49 S 25 41 E S 30 43 E S 26 24 E S 31 54 E S 35 54 E S 38 3 E 538 0 E S 40 55 E S 41 33 E S 42 1 E 90 4000 O0 4 16 9O 4100 O0 6 31 9O 4200 O0 9 31 90 4300 O0 12 48 90 4400 O0 16 25 90 4500 O0 20 39 90 4600 O0 24 44 90 4700 O0 27 35 90 4800.00 30 25 ENGINEER: G. JOHNSON 3992 07 3991 90 3900.00 4092 4192 4293 4395 4498 4604 4713 4824 4938 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 5056.34 4991 90 4900.00 32 56 5177.28 5091 90 5000.00 35 18 5299.96 5191 90 5100.00 35 20 5422.40 5291 90 5200.00 35 8 5544.95 5391 90 5300.00 35 15 5667.51 5491 90 5400.00 35 29 5790.54 5591 90 5500.00 35 45 26 42 31 28 40 53 54 65 74 28 100 28 133 33 175 29 223 64 278 25 S 42 41 E 338.79 S 43 36 E 405.33 S 44 17 E 474.69 S 44 37 E 543.48 S 44 49 E 612.40 S 45 1 E 681.26 S 45 11 E 750.87 291 2 02 3 56 4 52 4 O3 2 87 5 28 2 48 2 64 2 35 27.83 S 32.02 S 40.27 S 52.53 S 68 87 S 89 69 S 115 89 S 148 52 S 185 226 5 09 E 7 11 18 29 45 66 93 42 S 125 83 S 162 54 E 32 78 E 41 8O E 55 72 E 75 51 E 100 04 E 133 15 E 175 53 E 223 54 E 279 28 29 S 10 22 E 89 S 13 15 E 96 S 16 18 E 80 S 19 42 E 01 S 23 20 E 58 S 26 54 E 39 S 29 40 E 31 S 32 6 E 91 S 34 6 E 05 S 35 37 E 2.35 1.16 0.42 0.21 0.65 0.16 0.31 272 42 S 204 07 E 340 37 S 36 50 E 321 99 S 250 62 E 408 03 S 37 54 E 373 19 S 299 91 E 478 77 S 38 47 E 423 62 S 349 39 E 549 12 S 39 31 E 474 02 S 399 15 E 619 69 S 40 6 E 524 18 S 449 20 E 690 33 S 40 36 E 574 79 S 499 96 E 761 80 S 41 1 E 5913.61 5691 6036.18 5791 6157.81 5891 90 5600.00 35 31 90 5700.00 35 4 90 5800.00 34 24 6278.67 5991 90 5900.00 33 56 6398.72 6091 6517.64 6191 6635.77 6291 6752.94 6391 6869.64 6491 6986.03 6591 7102.02 6691 7217.74 6791 7333.01 6891 9O 6000 O0 33 17 9O 6100 90 6200 90 6300 9O 64OO 90 6500 90 6600 90 67O0 90 6800 O0 32 21 O0 31 52 O0 31 6 O0 3O 57 O0 30 36 O0 3O 21 O0 30 6 O0 29 30 7447.49 6991 90 6900.00 29 1 7563.24 7091 7682.62 7191 7803.51 7291 7924.32 7391 8048.03 7491 8172.19 7591 8296.18 7691 8421.74 7791 90 7000.00 31 26 90 7100.00 34 27 90 7200.00 33 41 90 7300,00 35 5 90 7400.00 36 31 90 7500.00 36 9 90 7600.00 36 33 90 7700.00 37 54 8549.77 7891.90 7800.00 39 24 S 45 47 E 820.44 S 46 22 E 888.96 S 46 53 E 955.75 5 47 23 E 1021 05 S 47 30 E 1084 S 47 14 E 1146 S 46 28 E 1207 S 45 14 E 1266 S 43 25 E 1324 S 41 37 E 1383 S 40 6 E 1441 S 38 39 E 1498 S 36 34 E 1555 83 68 24 33 94 34 31 96 94 S 34 13 E 1611.52 S 33 45 E 1669.74 S 33 53 E 1734.85 S 32 57 E 1802.72 S 31 51 E 1870.48 S 31 21 E 1943.31 S 29 28 E 2016.89 S 28 20 E 2090.13 S 26 52 E 2165.89 S 25 32 E 2245.51 0.31 0.59 0.53 071 0 48 0 52 0 92 0 69 0 86 0 74 1.10 0.85 1 .32 1 .45 2.23 0.74 0 88 1 9O 0 92 0 83 1 08 1 29 1 34 625 674 721 14 S 551 28 S 602 86 S 652 05 E 833 13 E 904 43 E 973 34 S 41 24 E O0 S 41 46 E 01 S 42 6 E 768.02 S 702 20 E 1040 65 S 42 26 E 812.90 S 751 856,51 S 798 899.46 S 644 941,97 S 888 984,98 S 930 1028.87 S 970 1073,36 S 1008 1118,36 S 1045 1163,73 S 1080 16 E 1106 49 E 1170 42 E 1233 25 E 1294 32 E 1354 55 E 1414 95 E 1473 91E 1531 96 E 1588 82 S 42 44 E 98 S 43 0 E 72 S 43 12 E 71 S 43 19 E 87 S 43 22 E 40 S 43 20 E 12 S 43 14 E 23 S 43 5 E 32 S 42 53 E 1209 24 S 1113 10 E 1643 55 S 42 38 E 1257 1311 1368 1425 1487 1551 1615 1682 1754 59 S 1145 63 E 1701 86 S 1181 71 E 1765 i44 S 1219 28 E 1832 73 S 1255 50 E 1899 68 S 1293 79 E 1971 17 S 1330 99 E 2043 32 S 1366.47 E 2115 64 S 1401.57 E 2189 40 S 1436.79 E 2267 18 S 42 20 E 62 S 42 1E 83 S 41 42 E 73 S 41 22 E 57 S 41 1 E 93 S 40 38 E 77 S 40 14 E 90 S 39 48 E 66 S 39 19 E COMPUTATION DATE: 31-DEC-90 PAGE 7 BP EXPLORATION P-19 (41-06-10-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 16-DEC-1990 KELLY BUSHING ELEVATION: 91.90 FT ENGINEER: G. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8680.74 7991.90 7900.00 41 10 8815.44 8091.90 8000.00 42 33 8951.41 8191.90 8100.00 42 30 9086.07 8291.90 8200.00 41 22 9217.81 8391.90 8300.00 39 50 9345.99 8491.90 8400.00 37 57 9473.43 8591.90 8500.00 38 16 9600.91 8691.90 8600.00 38 32 9728.82 8791.90 8700.00 38 40 9857.34 8891.90 8800.00 38 38 S 24 21 E 2329 54 S 22 59 E 2418 94 S 22 11 E 2510 03 S 19 48 E 2598 78 S 16 1E 2682 22 S 12 1 E 2758 71 S 9 17 E 2832 66 S 5 48 E 2905 01 5 2 11E 2975 93 S 2 16 E 3046.01 1 .90 0 63 1 18 1 86 2 64 1 38 2 17 1 75 2 30 2 32 1831.11 S 1472 39 E 2349 66 S 38 48 E 1913.87 S 1508 1998.82 S 1543 2082.97 S 1576 2164.51 $ 1602 2242.33 S 1622 2319.93 S 1636 2398.30 S 1647 2477.83 S 1652 2558.53 S 1655 35 E 2436 98 E 2525 40 E 2612 90 E 2693 14 E 2767 86 E 2839 23 E 2909 93 E 2978 09 E 3047 81 S 38 15 E 70 S 37 41 E 24 S 37 7 E 39 S 36 31 E 56 S 35 53 E 26 S 35 12 E 50 S 34 29 E 56 $ 33 42 E 19 S 32 54 E 9984.77 8991.90 8900.00 39 5 10115.99 9091.90 9000.00 41 32 10251.96 9191.90 9100.00 43 12 10360.00 9270.65 9178.75 43 12 S 7 44 E 3116.76 S 11 14 E 3195.65 S 13 18 E 3283.04 S 13 18 E 3353.38 3.08 2.42 0.00 0.00 2637.18 S 1661.91 E 3117.16 S 32 13 E 2720.91 S 1676.06 E 3195.70 S 31 38 E 2810.91 S 1696.26 E 3283.06 S 31 7 E 2882.90 S 1713.26 E 3353.56 5 30 43 E SCHLUMBERGER O I RECT I ONAL SURVEY COMPANY BP EXPLORAT I ON WELL P- 19 FI ELD PRUOHOE BAY COUNTRY USA RUN 1 DATE LOOOED 16 - DEC - 90 REFERENCE ?4266 ~ELL' P-19 .... (2319' NSL, 2057' EWL, SEC 3i '11N, R13E) HORIZONTAL PROJECTZON N~RTH 1000 REF 742S6 S~UTH -3000 -I000 8CI:ILE = l/~ IN/FT · .,~-.,4-.~..4- · I i ~ i i~i i i ~ ~ ~ ~i?".,'-'~ ~ ~ ~ ~-YT"Y'__:;4'~F_~..._~ ~-~ ~ : - ~ :-~ ~ : : ~ } ' ~ i ~ ' J b~-~..~-.~..4..~-L.'--...'..~.. '..;.... '..-, '-'...~ ...... ~..'.,.' ..... ~ : : ~ ~ ~ :' ~ i ~i; ; , :T : .... T~T~ t : :T,:~% : t ~ t t "~'"?"%"'t'"t"' ~ ~4- ~ '"?r+~"-~"+'~"+"? ...... r'-r-~'" "m"?'~"? '-'~'-+'ff-.~ ..... : ~ : . : : -~.~...~..~-.~...~..~.....4..4..-;.+..+.-~-.~-.-:..+.4...g.. i i : : : ~H~-~-~.-4-~-~--~ ~ ~ " ~-~+ ~ ~ ~.~--~---b~ .... b-~-~--~'---~--~---~..b.-.-~-~.~..-~- -~.-;..4-.- ~-~*'+-+--~-+-~," : .............. ~ ~ , -+~-"++~~ ~ ~ ~ ~ ~ , ~ .... +-+~ ~ ........ ~ ~ ..... ~'-+'"t'~ ~ ~ , ....... H-.+.;..-~--+-f'-~-'9"-'+"bF+--~---bHH+ ...... f-+-+--~'-'f'~-b'H ~-~-.,.~.-~..-,...~-4-4.~-~4---,.~ ~ .... ~.+~.~-...~-~.-~. ~.~.--~.~-,~.-,..~-~4 ~.~-+.~..,..,..,..~--.,..,...-~-~ ...... ~-,~.- "T'T-T?t~--Y~"~~? i T~ ~ i ~ i J "~-T""T~'~- ~'~ :i *'~-? .... ~'T- 'T'YT~'~- ~ J J : : i I I : i i i i I ; ' ; ' ] i i j I ~ I ! ]j i I' I : J~ ! ~ ~ I jj J J ~ ! }:]q'-~-' l~ ~'~1 J J ]'~'Y':"'-j'TI"'T"~H'~-~:i i, · ~4~..~ L~.L...~..g~-~...~_~ ~ ~ ~ ~ ~ i ~ ~ ~ --.i..+..H+.- ,--+--H-?~ ....... f.++-~...-H~-+--~ ...... -r.-,--T-?- ~ ~: ~ ~: i: ! ~ ~ ~ ~ ~ ~ ~ -~ ]-~. ~-H--~..H-H"-'-+H-'+-' ..+..H.~--~-H..1 -+.+-~ ~ ~ I ~ I I i J I I ! ~ ~ i ~ i .~ ~-~ :_?.~_?.~....l~_~_ ?'~'T~ ...... ~'~"~"'~ ...... ~"~-~'~ .................. I I~ ~i: ~ "~:-~--~:Ti~ ~ .... i ..... Ill[: i ! i~ ~ ~ ~ i~ ~ ~ ~i ~ ~: ~l~_~..l.~.~...~ ....... LZbZ.~LL.~-.--~-ZL~ ..... LZLL IIII I li~i ~l i ~ ~i ~,~l ~ ~ ~:~Z~4-~..~-~..1-~h.f.~ ...... t"t"?"~'?~""~"~"Y'~"'"~"?"~'"t" .................. , ..... ~-~.,..._+..~ i ,,, .............. .... ...... -500 0 SOO 1000 1500 2000 :;>500 3000 ERST ~ELL: P- 19 ~- (2319' NSL, 2057' EWL, SEC 3~ ,'llN, R13E) VERTICAL PROJECTION -L~C~__ - 1000 0 0 ! 000 ~ ~ 4000.__~ ~'.~ ~ ~ ~ ~1,~ I~T~"~T ~ ~??~r~ ..... ~'~'=-t .... :-'-~--: ..... T?"t--~-.V...: ....... i ) ! ( ~ ) I i ! I i ' I I ~ - j i i i ~ ~ ' - I i ~ ~ ~ ~ i; i -f ....... -- -- -?+- -f -'i ...... ~'"f'v", --"T'-t'm'f?)- i ~ : ~ ; ! i i i . ! i i 1 F 1 · ~ ~ ~ q ~ i i ~ i j : : j ~ : i ; i i ~-~-~'~-~ i ~ ~--+.-~ ....... ~.-4-..~-.-~ .... ~-~.-~.-.~ ...... ~..-*-~-..~.-.~...'-.~.4--~.-- ' ~ I : ' ; ~ ' ; = ; ~ : : ' .... I ' ' I J , I [ [ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ j j J J J ! i j ' i i j j ~ : i J ~ ] ~ ! ~ ~ 'T~-~'"'~'+"+'+~'+--+'+'+'+-"~"+~ - , - , : . ~ ~ - , , _ , . . ! , , , , , · - · ~ ~ i ~ 4 !l!!lJ!)l !l!i iii! ljil lli! J I I I !Ii Ilii i ) il)I i~); ; iii : ,: l!l i i iii iii; ..... I~ , ..... ,,, · , : ~,,. .,~. .~,. ,,, I ........ ,. ,l~, ',, l!~ ! ! l! i !l i i il i~ ~_.J_L~{ {~{~ ~ ii l ii ~li ~ i i i iii ~ - i i i i : ; : I : i i i I I 1! i i i i ) i i iii ) HIIIlll I, l~. ii i i !i i I I VtD~ Ii I~CI' ' .)[~,1 .... l~i ) ' t I ~" '~"++----+.++ ~ I 11 Ii ~ , ~i ~-~-~ ~ q i ~i: 'i:' !ili Ifil llll ...... , ,; ~ , . I.~ Illl l!i! ill! I1~;- liii l, ~ ' j~ 1,. --- ...... Ji i~ illl. !,,~, .... ~iii I.~_ _ L~ i ii!! I!ii ~ ~I I1i iii '''" · ' iJ' '' ',i ! .....! , 1,~!'~ ...... I~ ~ '' ~ ! ~i,i ~_i~.~_,_]..~.4! ! ~ ~ ! ffX~ ~i i ~ i i i i. ~ ' ~ ''~'- '~ ...... t~'*~'"'"'"'~"~- : %;~.-~'.' 4- J ! 4-3 ..... ' ~..i .... ~.~.4..4.. ~i j I i ~ i~) LLi i Ii i i J {I i i Ii ~j j j ii i ] r ~, I I IT~i I 111! I i i ! I ~ ~I ~l [ I i i i ! { : ~ ~ N i i {Ill i !ii II I!!i I I ~ ~ ' ' i:i ! i i i i_i i ~ ~ ~ i i i ~ ~ I I i ! i I i I I i i ~ ~ i i i ~ '~ i~T"' J J i I i i i ~ ~ i i~ i ~ { ~ ~ i ~ ~ ~ ' : I ' i i i ~ i i i i i i j i I } ''~'~' ~--'~ff''~''~'' ..'~''~.T~ i , , i ~ ~ q~ .... ~ ' ' ' el ~ i ~ I i l~: ~ ~ · ~, ~ ~ ~.i~-~.~¥.-~..,ff.~....l-+-4-~ ...... ~.-;..*.~ Jl -- -~ ...... ~-4 .......4-4..-~--' : ~ i q ' ' -" ' ; ; ' '~ ~--''~ .... '.---' '~ '- 4-' ~i~iI 1 .~l I i i I'~-??''i-'r''i-'~''~'i, i , ~ ~ I , ~ ...... i"+ff'"~;; ~ .... H-i'4"'i ! ~ ~ "++t~ '-~-~+' :~ ~ ; II , , -~-F~--~-.a~ 4--~-4-.-i-- , , , I i i i ~ i i I ! i~ i ~ i-i { i ~.] .... ~ ...... ~'"i"T"~ ..... ~"'¥?'~'"; "'~"T"7'T' ' , ~ ~ ~ ++..-~--.;.-4..~-~ ...... g-~,+-.i ...... ;..~,~.g ..... i..4..~.~.- ....... ~ , ~ ~ I ~ I I I J i .......... +~ ..... + ......... ~ .................... I!!i !I~ ,,,~ iii. ~U~]i~:~ ~, iili II}I :~ - - ~ ~ ' ~ ~ : ~ : ' ~ ' ' , i i ~ ~ ~'~' ~'+'?'?" "T'?'*''+'' ~"~"~'~"~ ....... ~-'~? .......... ?"~"~"? .~11 Iii! !!!Ii I!iii il!lili! iili!iii ii'I1 I iii}it ! I~,!1~ ''''!iii~i~'l [~+~ - ,~ ~4~I ;-~4 ~41i !III Ilii !ili i!ii {_iii i{{J im { i!ii i i~ : i~ii I i i i I I I ! i I ! ~ ~ ~ ~ ~ L~ ~ ~ i ~ I ~ ! i I i~ ~ j ! i"i ~'~'FTT~T"-~'~'F'T"-T'T'T"~ ....... T'T'TT" · ,,t I m J j ,i J I, 1 i , :l ~ , , = . ~ : , , , ,' 'T]-"}-T'~] , ,{ f ,{ ,l ' ,,i { j' J i j i T- , , ~ ~'~"T"T'T-"T'"T' ~T"'~'T"T ...... T'"T'~'"T ...... I I J , I ' ..... ": : ~ i { ~ i ~ , i I ~ f~ ~-i ~ i +-+~--~--'+ ...... +.'~-+.-+ ...... +.-~-~-.+- , ....... - .! I ~ : ' ~ ~'-~' ~ff-+"~'--~-+~ ..... ~-~-~"i .....!'"i"~'l~ ...... ~..%llr..~.ll ~-~' ~ i-~ .-~--? ~ :i ~ - ' - i I i I- ~--~ ~-~..~...-..i..-~...i...! ..... i..~...i...~ .... i.. i...i...i ...... L.i.&4.. :.4.. Iii{ Iii{ i,,-- ,, I ~ ~ ~, ! ! i { i iii'~T-?'~iii iiii i iI . ~ ~ ! i ~ ~ ~ ~ ! ! -~ 4 ~ i ...... ~.4..L.i- ..i...i-~...i .... i..~..~..i ...... i..i..-~...~ i , i ~ ~ ' ~ ~ I i i i i l'ti { { i i i I i j i {li { --~t. ~ 1,:,:z'~-+ .... +..4..~.~..:: . : ..4..4...;..4-:;:: ..~...~...i...~=:;; ...... i...;.-i..i=,,,l===,i...; i~, { 'iii~{ili, ~ ~,~n~ ~, ~ ~ ~{ ~t ~ ~---~,.--~ ........ ~-+.* ...... +.+.+...+..~.-~-.-~...,-..~ ...... *.+-?.-~T,.~-.--~-..~... 149. PROJECTION ON VERTICRL. PLANE 149. - 329. SCALED IN VERTICAL D(EPTHS HORIZ SCALE = I/I000 IN/FT TELE£O Teleco Oilfield S6 611 6 Nielson Way Anchorage, AK 99502 (907) 562-2646 ~s of Alaska Inc. November 15, 1990 JOB #782 BP EXPLORATION (ALASKA) INC. WELL: P-19 NORTH SLOPE/PRUDHOE BAY UDi 4, ORIGINAL Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Jonathan G. Mapes Field Operations Supervisor JGM/el Enclosures Alaska 0il & Gas Cons. C~mrnissio~] ;~,rlchorago, A .~..,,id~"l' COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 10/22/90 Company: BP Exploration Well: P-19 Location: North Slope/Prudhoe Bay Rig: AUDI 2 TELECO Job # 782TAK Grid Correction: 0.0° Magnetic Declination: 30.0° Total grid correction: 30.0° Proposed Direction: 145.9° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl /Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' Tie-in to magnetic single shots 496 0 0.8 55.0 '496.00 -0.05 1.86N 2'.66E 3.25 N 55.04E 0.00 995 499 0.5 122.0 994.98 1.89 2.58N 7.18E 7.63 N 70.25E 0.14 1495 500 0.8 260.0 1494.96 2.55 0.85N 5.81E 5.87 N 81.63E 0.23 1993 498 0.8 95.0 1992.95 3.27 0.00N 5.85E 5.85 N 89.96E 0.30 2490 497 0.3 150.0 2489.93 6.41 1.22S 9.63E 9.71 S 82.79E 0.13 PAGE 1 Company: BP E×ploration, Well: P-19, Location: North Slope/Prudhoe Bay, Riq: AUDI 2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' Teleco MWD surveys 2951 461 0.8 97.9 2950.91 9.56 2.53S 13.32E 13.56 S 79.24E 0.15 3422 471 0.7 63.0 3421.87 12.12 1.68S 19.14E 19.21 S 84.99E 0.10 3922 500 0.3 148.1 3921.86 13.80 1.40S 22.55E 22.60 S 86.44E 0.15 3976 54 0.9 153.0 3975.85 14.37 1.90S 22.82E 22.90 S 85.24E 1.11 4071 95 4.0 148.5 4070.75 18.42 5.40S 24.89E 25.47 S 77.76E 3.28 4165 94 5.6 159.0 4164.42 26.18 12.48S 28.26E 30.89 S 66.16E 1.93 4259 94 8.6 148.1 4257.70 37.67 22.74S 33.6].E 40.58 S 55.93E 3.49 4353 94 11.4 147.8 4350.26 53.98 36.57S 42.28E 55.90 S 49.14E 2.98 4448 95 14.8 143.9 4442.77 75.50 54.32S 54.44E 76.90 S 45.06E 3.70 4542 94 18.0 142.1 4532.94 102.00 75.49S 70.44E 103.25 S 43.02E 3.46 4635 93 22.3 139.7 4620.22 133.90 100.31S 90.69E 135.23 S 42.12E 4.70 4743 108 25.3 139.3 4719.03 177.21 133.44S l19.00E 178.79 S 41.73E 2.78 4837 94 27.9 139.0 4803.07 219.00 165.27S 146.53E 220.88 S 41.56E 2.77 4937 100 30.4 137.9 4890.40 267.29 201.71S 178.85E 269.58 S 41.56E 2.56 PAGE 2 Company: .BP Exploration, Well: P-19, Location: North Slope/Prudhoe Bay, Riq: AUDI 2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 5032 95 32.3 137.6 4971.53 316.21 238.29S 212.08E 319.00 S 41.67E 2.01 5125 93. 34.5 136.2 5049.16 366.77 275.66S 247.07E 370.17 S 41.87E 2.51 5218 93 35.4 136.2 5125.39 419.28 314.11S 283.94E 423.42 S 42.11E 0.97 5309 91 35.4 135.8 5199.57 471.21 352.03S 320.56E 476.11 S 42.32E 0.25 5409 100 35.3 134.1 5281.13 528.00 392.90S 361.50E 533.91 S 42.62E 0.99 5503 94 35.4 133.7 5357.80 581.20 430.61S 400~69E 588.20 S 42.94E 0.27 5604 101 35.4 134.8 5440.13 638.50 471.44S 442.60E 646.64 S 43.19E 0.63 5688 84 35.7 134.8 5508.47 686.42 505.85S 477.25E 695.45 S 43.33E 0.36 5776 88 35.9 134.4 5579.85 736.90 541.99S 513.90E 746.90 S 43.48E 0.35 5870 94 35.8 133.7 5656.04 790.77 580.27S 553.47E 801.90 S 43.65E 0.45 5964 94 35.6 133.0 5732.38 844.31 617.93S 593.35E 856.68 S 43.84E 0.48 6065 101 34.9 132.0 5814.86 901.02 657.32S 636.32E 914.86 S 44.07E 0.90 6159 94 34.5 132.0 5892.14 952.96 693.13S 676.08E 968.25 S 44.29E 0.43 PAGE 3 Company: BP Exploration, Well: P-19, Location: North Slope/Prudhoe Bay, Riq: AUDI 2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 6253 94 34.1 132.7 5969.79 1004.46 728.82S 715.23E 1021.14 S 44.46E 0.59 6347 94 3.3.7 132.7 6047.81 1055.50 7.64.37S 753.76E 1073.51 S 44.60E 0.43 6441 94 33.0 133.4 6126.33 1105.88 799.65S 791.53E 1125.15 S 44.71E 0.84 6528 87 32.4 133.4 6199.53 1151.77 831.95S 825.68E 1172.13 S 44.78E 0.70 6622 94 32.2 133.7 6278.99 1200.84 866.56S 862.09E 1222.34 S 44.85E 0.27 6715 93 31.3 134.4 6358.07 1248.73 900.58S 897.26E 1271.27 S 44.89E 1.05 6815 100 31.2 135.8 6443.56 1299.68 937.32S 933.88E 1323.14 S 44.89E 0.73 6908 93 30.8 135.8 6523.28 1346.84 971.66S 967.27E 1371.04 S 44.87E 0.43 7000 92 30.7 136.9 6602.35 1393.22 1005.69S 999.74E 1418.06 S 44.83E 0.62 7093 93 30.4 139.7 6682.44 1440.06 1040.98S 1031.18E 1465.25 S 44.73E 1.56 7187 94 30.3 141.4 6763.56 1487.35 1077.65S 1061.36E 1512.55 S 44.56E 0.92 7281 94 29.9 142.1 6844.88 1534.37 1114.67S 1090.54E 1559.41 S 44.37E 0.57 7374 93 29.2 144.3 6925.79 1580.17 1151.38S 1118.02E 1604.89 S 44.16E 1.39 PAGE 4 Company: BP Exploration, Well: P-.19, Location: North Slope/Prudhoe Bay, .Riq: AUDI 2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 7455 81 28.9 145.7 6996.60 1619.50 1183.60S 1140.58E 1643.73 S 43.94E 0.92 7547 92 31.0 145.0 7076.30 1665.43 1221.38S 1166.70E 1689.07 S 43.69E 2.32 7642 95 34.1 145.7 7156.37 1716.54 1263.44S 1195.75E 1739.57 S 43.42E 3.28 7736 94 34.3 145.7 7234.11 1769.38 1307.09S 1225.52E 1791.76 S 43.16E 0.21 7830 94 33.4 146.7 7312.18 1821.73 1350.59S 1254.66E 1843.44 S 42.89E 1.13 7925 95 35.1 148.1 7390.71 1875.18 1395.64S 1283.45E 1896.06 S 42.60E 1.97 8019 94 36.7 148.5 7466.85 1930.24 1442.54S 1312.41E 1950.21 S 42.30E 1.72 8114 95 36.4 150.2 7543.17 1986.71 1491.20S 1341.25E 2005.65 S 41.97E 1.11 8209 95 36.2 149.2 7619.73 2042.83 1539.76S 1369.62E 2060.76 S 41.65E 0.66 8311 102 36.8 150.2 7701.72 2103.37 1592.14S 1400.23E 2120.27 S 41.33E 0.83 8405 94 38.0 153.0 7776.40 2160.17 1642.37S 1427.36E 2175.94 S 40.99E 2.23 8499 94 39.0 152.3 7849.95 2218.29 1694.36S 1454.25E 2232.86 S 40.64E 1.16 8599 100 40.3 154.8 7926.95 2281.53 1751.49S 1482.65E 2294.77 S 40.25E 2.05 PAGE 5 Company: BP Exploration., Well: P-19, Location: North Slope/Prudhoe Bay, Riq: AUDI 2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 8681 82 41.6 154.1 7988.88 2334.67 1799.97S 1505.83E 2346.79 S 39.92E 1.68 8781 100 42.6 155.2 8063.08 2400.93 1860.56S 1534.53E 2411.73 S 39.51E 1.24 8875 94 42.7 154.5 8132.21 2463.84 1918.21S 1561.59E 2473.48 S 39.15E 0.52 8974 99 42.4 157.3 8205.15 2529.76 1979.31S 1588.93E 2538.18 S 38.76E 1.94 9068 94 41.6 159.7 8275.01 2591.14 2037.81S 1611.99E 2598.30 S 38.35E 1.91 9161 93 40.5 162.5 8345.15 2650.07 2095.58S 1631.78E 2655.96 S 37.91E 2.30 9255 94 38.9 163.9 8417.47 2707.40 2153.05S 1649.15E 2712.07 S 37.45E 1.95 9343 88 38.1 167.8 8486.35 2758.88 2206.14S 1662.55E 2762.45 S 37.00E 2.90 9437 94 38.4 168.2 8560.17 2812.81 2263.06S 1674.65E 2815.30 S 36.50E 0.41 9531 94 38.4 172.0 8633.85 2866.04 2320.56S 1684.68E 2867.60 S 35.98E 2.52 9625 94 38.7 173.8 8707.37 2918.23 2378.69S 1691.91E 2919.02 S 35.42E 1.23 9700 75 38.7 177.0 8765.91 2959.04 2425.42S 1695.66E 2959.38 S 34.96E 2.68 PAGE 6 TEL,-'CO 0 ~ 1 f i e 1 d PLAN VIE~ Services 400 BP Exploration P-19 ~X~9s ' North Slope/Prudhoe ~x,~.ss5 ' AUDI 2 '~,x,4937 ' JOB# 782TAK/O0 x~x 521a ' SCALE:  ~os ' 1 inch = 400 feet 8~14 '  83~ ' 8499 ~0~ ' ~ ~700 ~ 9437 ' Bay 4OO 800 1200 aa CD I 600 ~ 2OOO 2400 2800 3200 0 400 800 1200 1600 2000 EAST(ft) 2400 -~000 TEL~JO Oi 1 f ie ld Serv ~ ces VERT I CAL PROJECTION lO00 2000 3000 4000 5000 1000 20OO ~3000 ~4'000 >5000 6OOO 7OO0 BO00 9OO0 496 ' .75 cleg 995 ' .5 deg 1495 ' .75 cleg ~993 ' .75 deg BP Exploration P-19 North S]ope/Prudhoe Bay AUDI 2 JOB# 782TAK/O0 SCALE: ~ inch = lO00 feet 2490 ' .25 deg 295~ ' .8 cleg 3422 ' .7 deg 3922 ' .3 deg 4~65 ' 5.6 deg 4448 ' ~4.8 deg ff~4743 ' 25.3 deg -f~5032 ' 32.3 deg -~5309. ' 35.4 Oeg -~5604 ' 35.4 deg -~5870 ' 35.8 deg -k~6159 ' 34.5 aeg -~6441 ' 33.01 deg -~67i5 ' 31.3 deg -~7000 ' 30.7 deg -~728~ ' 29.9 deg -~7547 ' 31.01 deg -~7830 ' 33.4 deg ~x,~81~4 ' 36.4 deg kxX,8405 ' 38.01 deg --~681 ' 41.6 deg ~x,x,8974 ' 42.4 deg -~9255 ' 38.9 deg VERTICAL SECTION (ft) GREAT LAND DIRECTIONAL DRILLING, INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY BP EXPLORTION COMPANY 0 ....... LOCATION AL1090D34 MWD 10/19/90 JOB NUMBER LYNN HENSLEY TYPE SURVEY DIRECTIONAL SUPERVISOR DATE NAME TITLE SIGNATURE 496 FT. 9776 FT. DEPTH INTERVAL FROM TO 10/09/90 10/19/90 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. GREAT LAND Client .... : Field ..... : Well ...... : Section at: Engineer..: DIRECTIONAL DRILLING, BP EXPLORATION PRUDHOE BAY PRUDHOE BAY P-19 S,34.09,E LYNN HENSLEY INC. S MEAS INCLN C DEPTH ANGLE 3 496 0.75 3 995 0.50 3 1495 0.75 3 1993 0.75 3 2490 0.25 3 2951 0.80 3 3422 0.70 3 3922 0.30 3 3976 0.90 3 4071 4.00 3 4165 5.60 3 4259 8.60 3 4353 11.40 3 4448 14.80 3 4542 18.00 3 4635 22.30 3 4743 25.30 3 4837 27.90 3 4937 30.40 3 5032 32.30 3 5125 34.50 VERTICAL-DEPTHS BKB SUB-SEA 496.0 404.1 995.0 903.1 1494.9 1403.0 1992.9 1901.0 2489.9 2398.0 2950.8 2858.9 3421.8 3329.9 3921.8 3829.9 3975.8 3883.9 4070.7 3978.8 SECTION DISTNCE -1.5 1.3 4.3 8.1 11.9 15.7 18.2 21.3 21.8 25.9 4164.3 4072.4 33.6 4257.6 4165.7 45.1 4350.2 4258.3 61.4 4442.7 4350.8 83.0 4532.9 4441.0 109.5 4620.1 4528.2 141.4 4718.9 4627.0 184.7 4803.0 4711.1 226.5 4890.3 4798.4 274.8 4971.4 4879.5 323.7 5049.1 4957.2 374.3 10/23/90 RECORD OF SURVEY Computation...: Survey Date...: RKB Elevation.: Reference ..... : Ragnetic Dcln.: RADIUS OF CURVATURE 10/19/90 91.90 ft 30.00 E DIRECTION BEARING N 55.00 E S 58.00 E S 80.00 W S 85.00 E S 30.00 E S 82.10 E N 63.00 E S 31.90 E S 27.00'E S 31.50 E S 21.00 E S 31.90 E S 32.20 E S 36.10 E S 37.90 E S 40.30 E S 40.70 E S 41.00 E S 42.10 E S 42.40 E S 43.80 E RELATIVE-COORDINATES CLOSURE FROM-WELL-HEAD DISTNCE BEARING DL /lO0 2.8 N 1.4 E 3.1 N 27.50 E 0.15 2.9 N 6.6 E 7.2 N 66.18 E 0.05 1.2 S 5.8 E 5.9 S 77.82 E 0.05 5.7 S 6.0 E 8.3 S 46.16 E 0.01 8.0 S 9.5 E 12.4 S 49.96 E 0.10 10.3 S 12.9 E 16.5 S 51.47 E 0.12 9.2 S 18.9 E 21.0 S 63.89 E 0.02 10.3 S 22.7 E 24.9 S 65.56 E 0.08 10.8 S 23,0 E 25.4 S 64,81 E 1,11 14.3 S 24.9 E 28.8 S 60.10 E 3.26 21.4 S 28.4 E 35~6 S 53.04 E 1.71 31.8 S 33.6 E 46.2 S 46.59 E 3.20 45.6 S 42.2 E 62.2 S 42.81 E 2.98 63.4 S 54.3 E 83.5 S 40.59 E 3.59 84.6 S 70.3 E 110.0 S 39.72 E 3.41 109.5 S 90.5 E 142.0 S 39.58 E 4.64 142.6 S 118.8 E 185.6 S 39.80 E 2.78 174.4 S 146.3 E. ~ 227.7 S 39.99 E 2.77 210.9 S '178.6 E 276.4 S 40.27 E 2.52 247.5 S 211.9 E 325.8 S 40.57 E 2.00 284.8 S 246.8 E 376.9 S 40.91 E 2.41 Survey Codes: 3/MWD PRUDHOE BAY P-19 S MEAS C DEPTH 3 5218 3 5309 3 5409 3 5503 3 5604 3 5688 3 5776 3 5870 3 5964 3 6065 3 6159 3 6253 3 6347 3 6441 3 6528 3 6622 3 6715 3 6815 3 6908 3 7000 3 7093 3 7187 3 7281 3 7374 3 7455 INCLN ANGLE 35.40 35.40 35.30 35.40 35.40 35.70 35.90 35.80 35.60 34.90 34.50 34.10 33.70 33.00 32.40 32.20 31.30 31.20 30.80 30.70 30.40 30.30 29.90 29.20 28.90 VERTICAL-DEPTHS BKB SUB-SEA SECTION DISTNCE 5125.3 5033.4 426.8 5199.5 5107.6 478.8 5281.0 5189.1 535.6 5357.7 5265.8 588.8 5440.0 5348.1 646.1 5508.4 5416.5 694.0 5579.8 5487.9 744.5 5656.0 5564.1 798.4 5732.3 5640.4 851.9 5814.8 5722.9 908.6 5892.1 5800.2 960.5 5969.7 5877.8 1012.0 6047.7 5955.8 1063.1 6126.2 6034.3 1113.5 6199.5 6107.6 1159.3 6278.9 6187.0 1208.4 6358.0 6266.1 1256.3 6443.5 6351.6 1307.3 6523.2 6431.3 1354.4 6602.3 6510.4 1400.8 RECORD OF SURVEY 6682.4 6590.5 1447.6 6763.5 6671.6 1494.9 6844.8 6752.9 1541.9 6925.7 6833.8 1587.8 6996.5 6904.6 1627.1 DIRECTION BEARING S 43.20 E S 44.20 E S 45.90 E S 46.30 E S 45.20 E S 45.20 E S 45.60 E S 46.30 E S 47.00 E S 48.00 E RELAT I V E- COORD I NATES FROM-WELL-HEAD 323.5 S 283.5 E 361.6 S 319.9 E 402.5 S 360.9 E 440.2 S 400.1 E 481.0 S 442.0 E 515.4 S 476.6 E 551,6 S 513.3 E 589.8 S 552.8 E 627.5 S 592.7 E 666.9 S 635.7 E S 48.00 E 702.7 S 675.5 E S 47.30 E 738.4 S 714.6 E S 47.30 E 773.9 S 753.2 E S 46.60 E 809.2 S 790,9 E S 46.60 E 841.5 S 825.1 E S 46.30 E S 45.60 E S 44.20 E S 44.20 E. S 43.10 E Page 2 CLOSURE DISTNCE BEARING 430.1 S 41.23 E 482.8 S 41.50 E 540.6 S 41.88 E 594.8 S 42.27 E 653.2 S 42.58 E 10/23/90 DL /lOO 0.99 0.37 0.58 0.18 0.37 702.0 S 42.76 E 0.36 753.4 S 42.94 E 0.28 808.4 S 43.15 E 0.28 863.2 S 43.37 E 0.33 921.3 S 43.63 E 0.77 974.7 S 43.87 E 1027.6 S 44.06 E 1079.9 S 44.2.2 E 113115 S 44.35 E 1178.5 S 44.44 E 876.1S 861.5 E 1228.7 S 44.52 E 910.1S 896.6 E 1277.6 S 44.57 E 946.9 S 933.3 E 1329.5 S 44.59 E 981,2 S 966.7 E 1377.4 S 44.57 E 1015.2 S 999.1 E 1424.4 S 44.54 E S 40.30 E 1050.5 S 1030.6 E 1471.6 S 44.45 E S 38.60 E 1087.2 S 1060.7 E 151910 S 44.29 E S 37.90 E 1124.2 S 1089.9 E 1565.8 S 44.11 E S 35,70 E 1161.0 S 1117.4 E 1611.3 S 43.90 E S 34.30 E 1193.2 S 1140.0 E 1650.2 S 43.69 E 0.43 .0.49 0.43 0.78 0.69 0.23 0.99 0.39 0.43 0.33 0.84 0.47 0.46 0.94 0.55 3 7547 31.00 7076.2 6984.3 1673.0 S 35.00 E 1231.0 S 1166.1 E 1695.6 S 43.45 E 2.29 PRUDHOE BAY P-19 S MEAS INCLN C DEPTH ANGLE 3 7642 34,10 3 7736 34,'30 3 7830 33,40 3 7925 35,10 3 8019 36,70 VERTICAL-DEPTHS BKB SUB-SEA SECTION DISTNCE 7156.3 7064,4 1724.1 7234,0 7142,1 1776,9 7312,1 7220,2 1829,3 7390,6 7298,7 1882,8 7466,8 7374,9 1937,8 3 8114 36.40 7543,1 7451,2 3 8209 36,20 7619,6 7527,7 3 8311 36,80 7701,6 7609,7 3 8405 38,00 7776,3 7684,4 3 8499 39,00 7849,9 7758,0 3 8599 40,30 7926,9 7835,0 3 8681 41.60 7988,8 7896,9 3 8781 42,60 8063,0 7971,1 3 8875 42,70 8132,1 8040,2 3 8974 42,40 8205,1 8113.2 3 9068 41,60 8274,9 8183,0 3 9161 40,50 8345,1 8253,2 3 9255 38,90 8417,4 8325,5 3 9343 38,10 8486,2 8394,3 3 9437 38,40 8560,1 8468,2 RECORD OF SURVEY 3 9531 38,40 8633,7 8541,8 3 9625 38,70 8707,2 8615,3 3 9700 38.70 8765.8 8673,9 X 9776 38,70 8825,1 8733,2 1994,3 2050,3 2110,8 2167,6 2225,7 2288,9 2342,1 2408,4 2471,3 2537.2 2598,6 2657,5 2714,8 2766,3 2820,2 DIRECTION BEARING RELATIVE-COORDINATES FROM-WELL-HEAD Page 3 CLOSURE DISTNCE BEARING S 34,30 E 1273.0 S 1195.1 E 1746,1 S 43,19 E S 34,30 E .1316,6 S 1224,9 E 1798,3 S 42,93 E S 33,30 E 1360,2 S 1254,0 E 1850,0 S 42,68 E S 31,90 E 1405,2 S 1282,8 E 1902,7 S 42,39 E S 31,50 E 1452,1 S 1311,8 E 1956,9 S 42,09 E S 29,80 E S 28,80 E S 29,80 E S 27.00 E S 27,70 E 1500,8 S 1340,6 E 2012,4 S 41,77 E 1549,8 S 1368,2 E 2067,3 S 41,44 E 1602,7 S 1397,9 E 2126,7 S 41,09 E 1652,9 S 1425,0 E 2182,4 S 40,76 E 1704,9 S 1451,9 E 2239,4 S 40,42 E S 25,20 E 1762,0 S 1480,3 E 2301,3 S 40,03 E S 25,90 E 1810,5 S 1503,5 E 2353,4 S 39,71 E S 24,80 E 1871,1 S : 1532,2 E 2418,4 S 39,31 E S 25,50 E 1928,8 S 1559,3 E 2480,2 S 38,95 E S 22,70 E 1989,9 S 1586,6 E 2545,0 S 38,57 E 2048,4 S 1609,6 E 2106,1 S 1629,4 E 2163,6 S 1646,8 E 2216,7 S 1660,2 E 2273,7 S 1672,3 E 10/23/90 S 20,30 E S 17.50 E S 16,10 E S 12,20 E S 11,80 E DL /lOO 2873,5 S 8,00 E 2925,7 S 6,20 E 2966.5 S 3.00 E 3007,2 S 3,00 E 3,27 0,21 1,01 1,85 1,71 0.70 0,42 0,69 1,70 1,10 1,67 1,63 1,12 0,36 1,32 2605,1 S 38,16 E 1,41 2662,9 S 37,73 E 1,74 2719,0 S 37,28 E 1,80 2769,5 S 36,83 E 1,92 2822,4 S 36,33 E 0,36 2331,2 S 1682,3 E 2874,8 S 35,82 E 1,56 2389,3 S 1689,5 E 2926,3 S 35,27 E 0,81 2436,0 S 1693,3 E 2966,7 S 34.80 E 1,67 2483,5 S 1695,8 E 3007,2 S 34,33 E 0,00 ASurvey Codes: 3/MWD X/EXTRAPOLATED PRUDHOE BAY P-19 DATA INTERPOLATED FOR 100 Page FT SUBSEA INTERVAL 4 10/23/90 SUBSEA MEAS DEPTH DEPTH 500 592 600 692 700 792 800 892 900 992 INCLN TVD MD-TVD VERT ANGLE BKB DIFF CRRT 0.70 592 0 0.65 692 0 0.60 792 0 0.55 892 0 0.50 992 0 1000 1092 0.55 1092 1100 1192 0.60 1192 1200 1292 0.65 1292 1300 1392 0.70 1392 1400 1492 0.75 1492 1500 1592 0.75 1592 1600 1692 0.75 1692 1700 1792 0.75 1792 1800 1892 0.75 1892 1900 1992 0.75 1992 2000 2092 0.65 2092 2100 2192 0.55 2192 2200 2292 0.45 2292 2300 2392 0.35 2392 2400 2492 0.25 2492 2500 2592 0.37 2592 2600 2692 0.49 2692 2700 2792 0.61 2792 2800 2892 0.73 2892 2900 2992 0.79 2992 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DIRECTION BEARING 0 S 1.32 E 0 S 60.04 E 0 N 61.23 E 0 N 2.51 E 0 N 56.21 W S 31.24 E S 3.64 E S 23.96 W S 51.56 W S 79.16 W RELATIVE COORDINATES FROM WELL HEAD 2.32 N 2.33 E 2.87 N 3.71 E 4.61 N 4.40 E 6.58 N 3.53 E 7.38 N 1.39 E 2.28 N 7.20 E 1.34 N 7.51 E 0.30 N 7.38 E 0.64 S 6.78 E 1.23 S 5.81 E S 47.87 W 1.80 S 4.65 E' S 14.73 W 2.90 S 3.98 E S 18.40 E 4.19 S 4.02 E S 51.54 E 5.25 S '4.76 E S 84.67 E 5.73 S 5.95 E S 74.04 E 5.95 S 7.16 E S 62.97 E 6.35 S 8.12 E S 51.91 E 6.86 S 8.84 E S 40.84 E 7.43 S 9.29 E S 30.23 E 7.98 S 9.49 E S 41.53 E S 52.83 E S 64.14 E S 75.44 E N 53.76 W 8.42 S 9.81 E 8.95 S 10.35 E 9.49 S 11.12 E 10.00 S 12.15 E 9.87 S 13.03 E 3000 3092 0.77 3092 0 0 N 15.27 E 9.28 S 14.35 E PRUDHOE BAY P-19 Page 5 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL 10/23/90 SUBSEA MEAS INCLN DEPTH DEPTH ANGLE TVD BKB 3100 3192 0,75 3192 3200 3292 0,73 3292 3300 3392 0,71 3392 3400 3492 0,64 3492 3500 3592 0,56 3~592 3600 3692 0,48 3692 3700 3792 0.40 3792 3800 3892 0,32 3892 3900 3992 1,43 3992 4000 4092 4.36 4092 4100 4193 6,48 4192 4200 4294 9,63 4292 4300 4396 12,93 4392 4400 4499 16,54 4492 4500 4605 20,90 4592 4600 4713 24,47 4692 4700 4824 27,55 4792 4800 4939 30.44 4892 4900 5056 32,87 4992 5000 5177 35,00 5092 5100 5300 35,40 5192 5200 5422 35,31 5292 5300 5545 35.40 5392 5400 5668 35,63 5492 5500 5791 35,88 5592 MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 0 0 N 84,30 E 10,31 S 16,12 E 0 0 S 26,67 E 12,80 S 16,42 E 0 0 S 42,36 W 14,69 S 14,48 E 0 0 S 24,46 W 9,68 S 19,31 E 0 0 S 30,53 E 9,72 S 20,49 E 0 0 S 85.51 E 8.71 S 21.56 E 0 0 N 39,51 E 7,03 S 21,62 E 0 0 N 15,47 W 5,69 S 20,42 E 0 0 S 27,76 E 11,09 S 23,11 E 0 0 S 29,12 E 15,68 S 25,73 E 1 0 S 24,21 E 24,08 S 29,54 E 2 1 S 32,01 E 36,44 S 36.50 E 4 2 S 33,95 E 53,14 S 47,16 E 7 3 S 37,08 E 74,50 S 62,56 E 13 6 S 39,52 E 100,88 S 83,34 E 21 9 S 40,59 E 133,08 S 110,63 E 33 11 S 40,96 E 170,04 S 142,51 E 47 14 S 42,11 E 211,58 S 179,26 E 64 17 S 42,77 E 257,10 S 220,71 E 85 21 S 43,46 E 306,35 S 267,34 E 108 23 S 44,10 E 357,74 S 316,18 E 130 23 S 45,96 E 407,82 S 366,40 E 153 23 S 45,84 E 457.04 S 417,56 E 176 23 S 45,20 E 507,09 .S 468,23 E 199 23 S 45,71 E 557,71 S 519,56 E 5600 5914 35,71 5692 222 23 S 46,63 E 607,67 S 571,61 E PRUDHOE BAY P-19 Page DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL 6 10/23/90 SUBSEA MEAS DEPTH DEPTH 5700 6037 5800 6159 5900 6280 6000 6400 6100 6519 6200 6637 6300 6755 6400 6872 6500 6988 6600 7104 INCLN TVD MD-TVD VERT DIRECTION ANGLE BKB DIFF CRRT BEARING 35.09 5792 245 23 S'47.72 E 34.50 5892 267 22 S 48.00 E 33.99 5992 288 21 S 47.30 E . 33.31 6092 308 20 S 46.91 E 32.46 6192 327 19 S 46.60 E RELATIVE COORDINATES FROM WELL HEAD 656.14 S 623.84 E 702.62 S 675.40 E 748.54 S 725.65 E 793.83 S 774.58 E 838.20 S 821.58 E 32.05 6292 345 18 S 46.18 E 881.74 S 867.36 E 31.26 6392 363 17 S 45.04 E 924.61 S 911.29 E 30.96 6492 380 17 S 44.20 E 967.80 S 953.61 E 30.71 6592 396 16 S 43.24 E 1010.76 S 994.91 E 30.39 6692 412 16 S 40.10 E 1054.82 S 1034.18 E 6700 7220 6800 7335 6900 7450 7000 7565 7100 7685 30.16 6792 428 16 S 38.36 E 1100.18 S 1071.05 E 29.49 6892 443 15 S 36.62 E 1145.61 S 1106.19 E 28.92 6992 458 15 S 34.39 E 1191.07 S 1138.53 E 31.60 7092 473 16 S 34.86 E 1238.77 S 1171.53 E 34.19 7192 493 20 S 34.30 E 1292.95 S 1208.74 E 7200 7806 7300 7927 7400 8050 7500 8175 7600 8299 33.63 7292 514 21 S 33.56 E 1348.99 S 1246.67 E 35.13 7392 535 21 S 31.89 E 1405.96 S 1283.31 E 36.60 7492 558 24 S 30.94 E 1468.09 S 1321.49 E 36.27 7592 583 24 S 29.16 E ~ 1532.02 S 1358.31 E 36.73 7692 607 24 S 29.68 E 1596.40 S 1394.25 E 7700 8425 7800 8553 7900 8685 8000 8820 8100 8956 38.21 7792 633 26 S 27.15 E 1663.82 S 1430.57 E 39.71 7892 661 29 S 26.34 E 1735.61 S 1467.55 E 41.64 7992 693 32 S 25.85 E 1812.99 S 1504.69 E 42.64 8092 728 35 S 25.09 E 1895.22 S 1543.41 E 42.45 8192 764 36 S 23.20 E 1978.77 S 1581.90 E 8200 9091 41.33 8292 799 34 S 19.62 E 2062.47 S 1614.76 E PRUDHOE BAY P-19 Page 7 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL 10/23/90 SUBSEA MEAS INCLN DEPTH DEPTH ANGLE TVD BKB 8300 9222 39.46 8392 8400 9350 38.12 8492 8500 9478 38.40 8592 8600 9605 38.64 8692 8700 9733 38.70 8792 MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 830 31 S 16.59 E 2143.70 S 1640.94 E 858 28 S 12.17 E 2221.07 S 1661.10 E 886 27 S 10.16 E 2298.43 S 1677.07 E 913 28 S 6.58 E 2377.09 S 1688.18 E 942 28 S 3.00 E 2456.93 S 1694.40 E PRUDHOE BAY P-19 Page 8 DATA INTERPOLATED FOR 1000 FT MEASURED DEPTH INTERVAL 10/23/90 MEAS INCLN VERT-DEPTHS SECT DIRECTION REL-COORDINATES CLOSURE' DL/ DEPTH ANGLE BKB SUB-S DIST BEARING FROM-WELLHEAD DIST BEARING. 100 1000 0.50. 1000 908 2000 0.74 2000 1908 3000 0.79 3000 2908 4000 1.68 4000 3908 5000 31.66 4944 4852 1 S 56.62 E 3 N 7 E 8 S 84.23 E 6 S 6 E 15 N 48.28 W 10 S 13 E 22 S 28.14 E 11 S 23 E 307 S 42.30 E 235 S 200 E 7 N 66.47 E 0.1 8 S 46.55 E 0.1 16 S 53.20 E 0.1 26 S 64.08 E 3.3 309 S 40.47 E 2.0 6000 35.35 5762 5670 872 S 47.36 E 642 7000 30.70 6602 6510 1401 S 43.10 E 1015 8000 36.38 7451 7360 1927 S 31.58 E 1442 9000 42.18 8224 8132 2554 S 22.04 E 2006 608 E 884 S 43.46 E 0.8 999 E 1424 S 44.54 E 0.3 1306 E 1946 S 42.16 E 1.7 1593 E 2562 S 38.46 E 1.4 Spast L end Directional O~illing. £nc. <KB>O A 500 ~ . i t000 ~ t500 ~ 2000 ------ 2500 , 3000 3500 4000 T 45oo V D ~ooo 5500 6000 6500 7000 - 7500 BO00 850O 9000 500 VEBTICAL SECTION VIEW BP EXPLORATION FRUOHOE BAY P-i9 Section at: S 34.09 E TVD Scale.: ~ inch = I000 feet Dep Scale.: i inch = iO00 feet Drawn .....: 10/23/§0 Marker Identification MD TVD SECTN INCLN A) KB 0 0 0 0.00 B) TD 9776 8825 3007 38.70 I 500 iO00 i500 2000 2500 3000 3500 4000 4500 5000 Section Departure 14arker Identification MD N/S F/il A) KB 0 0 N 0 E B) TD 9776 2483 S t696 E PLAN VIEW BP EXPLORATION PRUDHOE BAY F-19 CLOSURE ..... : 3007 ft S 34.33 E DECLINATION.: 30.00 E i SCALE · ~ inch = 400 feet ~DRAHN.' ...... : '' 0 '~ aoo 400 800 ~000 i~O0 i400 i§O0 iBO0 -- ~000 2200 ~400 2§00 200 I 0 200 400 <- ~EST · EAST -> 800 800 t000 t200 t400' t600 t800 2000 2200 PERMIT # ~ b COMPLETION DATE AOGCC GEOLOGICAL MATERIALS ]NVENTO~Z LiST /$ WELL NAME ,~,i~ ~ / /~ ~ ~ / ~o CO. CONTACT check off or list data as it is received.*list received date for 407. if not reo, uircd list as NR 4§7 l*.3//¢/~/ drillina histo,-v I ~'1 surveyL~ J well tests ~ core dcscriptio~ cored in{e~ais core analysis dry, ditch intervals digital data ~' ?..~ i . ,~o"~,.,n= i RUN i iINlklTC'ntiilO,--n,~,LO 1 SCALE i ~" '' ~ ! HO. [to thc nearest foot] [inchtl I " ' ~ ' ' ' ....... ~'" ! ' ' ' ' .... J ...... ' '-' BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO Date:l 1/05/90 CHEVRON T#:81 626 EXXON MOBIL PHILLIPS STATE OF ALASKA TEXACO GEOSCIENCE ARCHIVES BP OPEN HOLE FINAL Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. ! P-19 DIL/SFL 10/22/90 #1 9764-10356 HLS 2"/5" "P-19 DSN 10/22/90 #1 10058-10247 HLS 2"/5" ~ P-19 BHCS 10/22/90 #1 9764-10334 HLS 2"/5" --P-19 HRi/DFL 10/24/90 #1 10058-10292 HLS 2"/5" '" P-19 DSN2 10/22/90 #1 HLS 2"/5 ',D-19 HR!/DFL I r~oo:~n,,,, ,- .... #1 HLS 2"/" *** GEOS/ARCO/EXXON/ARCH IVES ONLY. STATE ONLY: Magnetic Single Shot Directional Survey Gyroscopic Directional Date: Date: Job#: Job#: Inforation Control Well Records LR 2-1 J.. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P,O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :02/20/91 T#:82117 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. %P-14 % P-14 ,,~-S-22 S-22 ~.-.S-22 CBT 02/11/91 #1 5300-10338 Sch 5" CET 02/11/91 #1 9858-10361 Sch 5" Completion 02/11/91 #1 9777-10190 Sch 5" CBT 02/01/91 #1 9350-10163 Sch 5" CET 02/01/91 #1 9350-10186 Sch 5" Completion 02/10/9i #1 9762-10153 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561.5111 TO: DISTRIBUTION Date: 02/04/91 T#:82028 FROM: SUBJECT: Information Control Well Records LR2-1 ,BP CA,~ED HOLE FINALS Enclosed is your copy of the rnatedai listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. K-04 TEMP 01/18/91 #1 8000-8935 CAMCO P-19 PROD-F 01/21/91 #1 9850-10200 CAMCO P-20 CCL/TEM P 01/18/91 #1 11800-12500 CAMCO _ Z-01 CCLFFEM P 01/19/91 #1 9700-10700 CAMCO 5~ 5" 5" 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 01/07/91 T#:81922 FROM: SUBJECT: Information Control Well Records LR2-1 BP P..A,~ED HOLE FINAL.~ Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. F-38 CBT 12/23/90#1 9513-10653 SCH F-38 CET 1 2/23/90 #1 9513-10675 SCH J-08 TUBING PUNCHER 12/28/90 #1 2890-5165 SCH S-29 PERF 1 2/29/90 #1 12420-I 3249 SCH P-19 PERF 12/29/90 #1 9380-10201 SCH 11 Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED JAN 15 1991 Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE: 12/31/90 EXXON T#: 81911 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM Tape & Transmittal Only BP MAOoNETI¢, LI~; TAP~ & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. OPEN HOLE: S-31 DITE/BHC/CNL 1 2/14/90 #2 7100-11415 SC H#74248 1600 B PI AP1#50-029-22109 TAPE POS.#07526 '~ /~ '~/¢"~' CASED HOLE: P-19 CNL 12/16/90 #1 9745-10232 SCH#74249 1600BPI AP1#50-029-22094 TAPE POS.fl07527 Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date' 12/20/90 T#:81906 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. P-19 CBT 12/16/90 #1 9400-10207 SCH 5" P-19 CET 12/16/90 #1 9400-10230 SCH 5" P-19 CNL 1 2/16/90 #1 9745-10232 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE:I 1/02/90 EXXON T#: 81625 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM TaPe ¢ Transmittal Only BP MA(~NETI¢ I,,I,~ TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. P-19 DIL/MSFL/BCS/H RI/SDL/DSN2 TAPE POS.#07403 HLS#532191 10/22/90 #1 9760-10390 800BPI AP1#50-029-22094 Information Control Well Records LR 2-1 J. Dietz/S. McCurry REC£1V£D t,10V 1 4 1990 Alaska O~l & Gas Cons. commission Anchorage TO: THRU: FROM: MEMORANOUM Stale of Alaska ALASKA OIL AND GAS CONSERVATION CO~IISSION Lonnie C. Smi~R October 22, 1990 Commis s ioner FILE NO: JT HH 102f) · . ~..2 TELEPHONE NO: SUBJECT: RIG/BOPE Test BPX PBU Pad P-19 Permit No. 90-136 Prudhoe 0il Pool HaroId Hawkins Petroleum inspector ~ Thursda)I October il, 1990: I went to BPX PBU pad-P to witness a BOP test on AUDI ~' --~ ~.zg ~_. Lewis Bro~rn was the BPX representative. ])an Hebert was the toolpusher. There were no failures. Attached is an AOGCC zze~d report· In surmary: The BOP test on BPX PBU pad P-19 was satisfactorily per~.oz~ned by AUD 2 rig crew. 02~001A (Rev. 6/89) 20/ll/MEMO1.PM3 OPERATION: Drlg / Wkvr STATE OF ALASKA ALASKA 01L AND GAS CONSERVAT i ON COMM I SS I ON BOPE Inspection Report / TEST: Initial~ b/ Weekly~ Other Well, b Orlg contrctr ~ b Housekeeping (general Reserve pit ~ , Well sign. MUD SYSTEMS: Trip tank V~al Pit gauge ~? Flow monitor Cas detectors Audio Rig, BOPE STACK: Test Pressure Annular preventer Pipe rams B]ind rams Choke line valves ... HCR valve ~--~ Kill line valves Check valve ~/~. TEST RESULTS: ACCUMULATOR 5YSTEH: ft Full charge pressure Press after closure Pump incr clos press 200 psig Full charge press attained ._~. psig pstg min /7 sec mi n ~)' sec N 5/.Z 2lmm Controls: Master . e./_~/~? Remote ' .i~'/~y B1 i nd switch cover KELLY AND FLOOR SAFETY VALVES: Upper Kelly Lower Kelly Ball type Inside BOP Choke manifold Number valves // Number flanges Hydraulically operated choke Test pressure Test pressure Test pressure Test pressure Test pressure Failures /~ &' ~-- Test time . hfs Repair or replacement of failed equipment to be made within --~-'-U~ys, Notify the Inspector, and follow with written/FAXed verification to Commission office, Distribution: ortg - AOGCC c - Operator c - Supervisor C.004 (rev 05/10/90) WITNESS October 8, 1990 Telecopy: (907)276-7542 Bill Kirton PBU Lead Engineer BP Exploration (Alaska) inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Unit P-19 BP Exploration (Alaska) Inc. Permit No. 90-136 Sur. Loc. 2319'SNL, 2057'WEL, Sec. 31, TllN, R13E, UPI Btmhoie Loc. 395'SNL, l122'WEL, Sec. 06, T10N, R13E, UM Dear Mr. Kirton: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other goverrm~ental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE tests 'that it wishes to witness. Sincere ly, Co~ission~' Alaska O~l and Gas Conservation Co~ission BY OF-~ER OF THE COMI-IISSION dif Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrillr-]llb. Type of well. Exploratory E] Stratigraphic Test[-I Development Oill[] Re-Entry [] DeepenF'II Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Ex~lorati(~n KBE = 88' feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchorage. Alask~ 99519-6~12 ADL 4. Location of well at surface 7. UnJ't or property Name 11. Type Bond(see 2o AAC 25.025) 2319' SNL, 2057' WEL, SEC. 31, T11N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 262' SNL, 1212' WEL, SEC. 06, ~14.N, R13E P-19 (41-06-10-13) 2S100302630-277 At total depth ?-×~,,,.-.,' 9. Approximate spud date Amount 395' SNL, 1122' WEL, SEC. 06, T~14N, R13E October 10, 1990 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(uDandTVD) property line ADL 28279/395' feet P-20 @ surface~35' feet 2560 102 40'MD/9217'TVDf e e t 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25.035 ¢,)(2)) Kickoff depth 4ooo'feet Maximum hole angle~6.~6 o Maximum surface 3330 pslg At total depth (TVD) 8800'/#390 pslg 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" Cond. 80' Surface 110' 110' 13-1/2" 10-3/4" 45# L-80 Butt 2650' Surface 2680' 2680' 1949 cu ft Permafrost 9-7/8" 7-5/8" 29. 7# L-80 NSCC 9662' Surface 9692' 8776' 1392 cu ft Class G 6-3/4" 5-1/2" 17# NT80-$ FL4S 798' 9442' 8574' 10241' 9217' 168 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Surface Conductor ECEIVED Intermediate Production Liner Perforation depth: measured true vertical -~-,.~., 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify~a..~e ,~,rue and correct ,o the best of my knowledge.~ Signed Title PBU Lead En.qineer /' ,~ ~ Date Commission Use Only Permit Number IAPI number ~ IApproval date ISee cover letter ~'~ '"/-~/" 15°'~~'- ~ ~ ?~' I 10/08/90 Ifor other requirements Conditions of approval Samples required [] Yes ~ Mud log requi~d_ [] Yes~.'i__.t'No Hydrogen sulfide measures [] Yes..~ No Direction~. survey requ~re~ /E~'Yes [] No Required working pressure for BO~J~E 1-12M~.._~ ~5M; r-I10M; r-115M; Other:~/,,,~"'/ ,,/ /._/,~,//' ,t.. ~' by order of Approved by ,- ~ Form 10-401 Rev. 12-1-8~x Submit in triplicate AFE No. 125291 PROPOSED DRILLING AND COMPLETION PROGRAM 3yELL P-19 [41-6-10-131 PBU Install and cement 80' of 20" conductor to surface. Install 20" diverter. The Drilling fluid program will consist of an 8.5-9.5 ppg spud mud in the 13- 1/2" hole, a 9-9.7 ppg water base mud in the 9-7/8" hole and a 9.0 ppg water base mud in the 6-3/4" hole. Drill 13-1/2" hole to 2700' MD and cement 10-3/4" 45# L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directional drill 9-7/8" hole to the 7-5/8" casing point above the Sadlerochit Sandstone. Run 7-5/8" 29.7# L-80 NSCC casing to within 10' of 9-7/8" TD and cement with Class G cement around the 7-5/8" shoe. The annulus will be freeze protected by dry crude. Directional drill 6-3/4" hole to TD. Run 5-1/2" liner from TD to 250' inside 7-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" float equipment. Test casing and lap to 3000 psi. Change over to NaCL completion fluid. Run 7-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. The well will be perforated with rig off location. Fluids incidental to the drilling of a well will be pumped down the 7-5/8" x 10- 3/4" annulus of the well. Tubing Size: 4-1/2", 12.6# L-80, TDS R-3 TBG with 7 GLM's. Tailpipe Size: sal: 9/11/90 4-1/2" TAILPIPE PROPOSED DOWNHOLE DIAGRAM WELL P-19 [41-6-10-13] PBU PROPOSED DEPTH BKB 20" Conductor 110 Ball Valve 2100 10-3/4" Casing Shoe 13-1/2" Open Hole 2680 2700 Calculated cement top 3210' 4-1/2" 12.6# L-80 TDS R-3 Tubing with 7 GLM's 7-5/8" Packer 9392 5-1/2" Tieback Assembly 9442 7-5/8" Shoe 9692 9-7/8" Open Hole 9702 5-1/2" 17# FL4S NT-80S Liner 5-1/2" PBTD 10171 5-1/2" Liner Shoe 10241 6-3/4" Open Hole 10241 SAL: 8/24/90 PRELIMINARY WELL PLAN Well: P-19 LOCATION: Surface: Target: T.D.: ESTIMATED START: [41-6-10-13] PBU 2319' SNL, 2057' WEL, Sec. 31 , TllN, R13E 262' SNL, 1212' WEL, Sec. 6, Tl lN, R13E 395' SNL, 1122' WEL, Sec. 6, Tl lN, R13E October 1990 OPR. DAYS TO COMPLErE: 24 Alaska United #2 MAX ANGLE/SECT COURSE/KOP/BUILD RATE: I;~m TVD~$ 36.26/S 34.1 20" CONDUCTOR 10-3/4" SHOE BASE WEST SAK FORMATION IKRU-PBU 7-5/8" SHOE TOP SAG RIVER SANDSTONE TOP SADLEROCH1T TARGET TOTAL DEPTH E/4000/2.5 MD(BKB) Mud Wt. 110 8.5 2588 2680 9.5 5593 5859 9.O 7353 8041 9.0 8683 9692 9.7 8692 9702 9.0 8809 9847 9.0 8907 9969 9.0 9126 10241 9.0 LOGGING PROGRAM: Open H01e - Record all logs on magnetic tape where applicable. 9-7/8" Hole: None 6-3/4" Hole: GR/SP/DIL/BHCS, GR/CNL/LDT, RFI' and optional sidewall coring Cased Hole CBT/CET and Gyro. sal: 9/11/90 Perforate after rig release. BOP STACK CONFIGURATION 13 5/8", .5000 PSI WP TRIPLE RAM ST ACK DRILLING RISER ANNULAR PREVENTER , , I I PI PE RAMS 2" KILL LINE MANUAL GATE I BLIND RAMS HYDRAULIC GATE DRILLING SPOOL I PI PE RAMS , I I 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE SURFACE HOLE DIVERTER SYSTEM Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. 10" Full Opening Valves 35' or as required ,,,..._ I · '"- i 3 Dresser Sleeve 10" Diverter Line 1. All pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. 2. Manual 10".b~valve~ mechanically connected to ensure that one valve is fail-safe open at all times. 3. All tums are 90 deg. and targeted. 10" Full opening ball valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet KRL 12/18/89 WELL No. P-19 LAT. == LONG. = ~34~°56'17.205 y = ~5,947,047.85 A.S.P: X ... .631,343.35 ZONE ' 2057' FROM WEST LINE SURVEYOR'S CERTIFICATE (MILES) 2 3 PADP-19 I hereby certify that I om properly registered and licensed to practice land surveying in the State of Alaska, and that this plat represents a survey made by me or under my supervision, and that all dimensions and other details 'are correct. .. Date SEPT. 111; 1990:: :LS 'No~.' :'": 17335::-- *'"/ Registered Land'-~yor WELL PAD "P" ¸th .Keith A. McNeil -No. LS 7335 WELL No. P-19 ASBUILT LOCATED IN PROTRACTED SECTION 31, TOWNSHIP 11 NORTH, RANGE 13 EAST, UMIAT MEREDIAN, ALASKA SURVEYED FOR: B.P. EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 SURVEYED BY: ARCTIC SLOPE CONSULTING GROUP 6700 ARCTIC SPUR ROAD ANCHORAGE, ALASKA 99518 DRAWN BY: KMC DATE: 9/10/90 .! 251 30 31 5O 31 Ld 31 2057' T11 N T1 ON 51 6 NO SCALE PADP-19X WELL PAD "P" WELL No. P-19 ASBUILT LOCATED IN PROTRACTED SECTION 51, TOWNSHIP 11 NORTH, RANGE 15 EAST, UMIAT MEREDIAN, ALASKA SURVEYED FOR: B.P, EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 SURVEYED BY: ARCTIC SLOPE CONSULTING GROUP 6700 ARCTIC SPUR ROAD ANCHORAGE, ALASKA 99518 DRAWN BY: KMC IDATE: 9/12/90 $45DUA124:[DRAN034]P19 CLOSAP SHORT.LIS;1 Search Radius= 200 COURSE LINE For proposed well: P-19 [11- 6-10-13] Location = W-E S-N TVD(SBS) Top 631343.00 5947048.00 -92.00 Bottom 633176.34 5944439.18 9005.00 lI-SEP-1990 15:34 --- Closest Approach Analysis ---- Date: ll-SEP-90 Time: 15:34:34 Note: All depths in feet Below Kelly Bushing (BKB) Page 1 Closest Approach WELL IDENT /PROPOSED% /NEARBY~ CLOSEST TVD DEPART TVD DEPART DISTANCE A029-1000200 P-Sl A029-1000202 P-56 A029-1000204 P-62 A029-2053600 MPTR43 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 7935.8 2336.7 8029.3 4096.9 1019.4 SUMMARY The well which comes closest to the proposed well is: A029-2053600 MPTR43 Closest approach distance = 1019.4 feet KICK OFF for this run = 4000.0 feet Vertical Intersection /PROPOSED\ /NEARBY~ TVD DEPART TVD DEPART VERTICAL DISTANCE $45DUA124:[DRAN034]P19 CLOSAP SHORT.LIS;1 15:34 Page 1 Search Radius= 200 COURSE LINE For proposed well: P-19 [11- 6-10-13] Location = W-E S-N TVD(SBS) Top 631343.00 5947048.00 -92.00 Bottom 633176.34 5944439.18 9005.00 Note: Ail depths in feet Below Kelly Bushing (BKB) ll-SEP--1990 --- Closest Approach Analysis --- Date: ll-SEP-90 Time: 15:34:34 Closest Approach WELL IDENT /PROPOSED% /NEARBY% CLOSEST TVD DEPART TVD DEPART DISTANCE A029-1000200 P-51 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW A029-1000202 P-56 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW A029-1000204 P-62 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW A029-2053600 MPTR43 7935.8 2336.7 8029.3 4096.9 1019.4 Vertical /PROPOSED% TVD DEPART Intersection /NEARBY~ TVD DEPART VERTICAL DISTANCE SUMMARY The well which comes closest to the proposed well is: A029-2053600 MPTR43 Closest approach distance = 1019.4 feet KICK OFF for this run = 4000.0 feet WELL P-19 (11-6-10-13~ Cement Calculations J0-3/4" CASING Measured Depth: 2680' Basis: 2 X Annular volume Total Cement Vol: 1949 (cu ft) 7-5/8"CA$IN(~ Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 9692' 90% Annular Volume to 10-3/4" + 36 cu ft 1392 (cuft) 1242 (cuft) 150 (cu ft) 5-1/2" LINER Measured Depth: Basis: Total Cement Vol: 10241' (Shoe) 1.5 X Annular volume to 7-5/8" shoe + 100 cuft 168 (¢u ft) sal: 9/11/90 · · · r 4 ct D Fo rtuD ro T~r 1 - Brandt Dual Tandem Shale Shaker 1- Demco 6-12" Cone Shale Desander 1- Demco 416t! w/16 cones & (1) Demco 48H w/16 cones (Desilter) ' 1 - Drilco Atmospheric Mud Degasser rl~ Ftow, D£~Co IZ 3 50 e~.. 50 1- 200 gpm Operating Capacity. Centrifuge 15 - Brandt MA5 Mud Mix Agitators 1- 150 bbl. Trip Tank 1- Recording drilling fluid pit level indicator with both visual and audio warning, devices at driller' s console LZsI F0z wmm APPROVE DATE (2 8)'" ' (~) (10 ~ i3). 12.' 13. (4) Casg , ,, (23 :hr: 28) Company ~ ~ Lease & Well No. · , , YES NO , ~ Is :he parmA: fee an:ached., ..... .................................. :. ~ 14. 15. 16. 17. 18. !9. 20. 21. 23. 24. 25. 26. 27. 28. Z. Is well :o' be located in a defined pool ............................. 3. is well loca:ed proper dis:anco from property line .., ............... 4. Is well located proper dis:anco ~rom other wells ........ ~ ........... 5. is sufficien= undedicated acreage available in :his pool ............ 6. Is well =o be deviated and is we!lbore plat included ................ 7. Is operator :he only affected parry. ......... ' ....................... 8. Can permi= be approved before fifteen-day wa_it ...................... Does operator have a bond in force .................................. is a conservation order needed ...................................... Is ad~s=rative approval needed ................................... Is =he lease number appropriate ..................................... Does =he well have a unique marne and number ..................... · .... IS c6nduccor string provided ........................................ Will surface casing pro=ac: all zones reasonably ~xuec:ed :o serve as an underground source of drinkf~g wa:ar ..................... Is enough careen: used =o circulaua on conduc:or and suvaco ......... W~I :amen: :ia in surface and intarmedia:e or produc:ion strings ...' Will cement cover ~ known produc:ive horizons ..................... Will al! casing give adaqua=a safety in collapse, :ension and burs:.. ts =his well to be kicked off from an e---~lsting wei!bor~ ............. Is old wellbore abandoumen= procedure included on 10-403 ............ is adequate wellbore separation proposed ..................... ' ...... is a d/veT=ar system r~quired ....................................... Is ~he dri!/.img fluid program schematic and list of equipmen: adequa:e Are necessary dlagr~.s and descriptions of ~iveruar and BOPE atuached. Does BOPE have sufficien: pressure rating - Test ~:o ~-Ooo psig .. Does ~he choke manifold comply w/APl R~-53 (May 84) .................. IS :he presence of ~2S gas probable ............................. ~... (6) OTKb~ rev: 01/30/89 6.0IL · · 29. 30. 31. 32. exp. iorauo=t and S=rauigrap. kic we!!sr Are data presenued on potential overpressure zones? ................. Are seismic analysis data presented on shaJ_low gas zones ............. If an offshore lo¢., are survey resul:s of seabed ¢ondltions presen:ed Addi=iom~l requiremmmus ............................................. INITIAL GE0. IINIT { 0N / OFF POOL C-ASS STraTUS AREA NO. SNORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. T° improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX.' .. No special 'effort has been made to chronologically organize this category of information. COMPUTER DIRECT DIGITAL LOGGING RECEIVED NOV 1 4 1990 Alaska Oil & Gas Cons. Commission Anchorage PROCESSED ANALYSIS CROFILME iLLLLLLLLLL ,LLLLLLLLLL IIIIIIIIII SSSSSSS$ IIIIIIIiII SSSSSSSSSS ii SS ii SS Ii SSSSSSSSS II SS~SSSSSS Ii SS Ii SS ii SS ~S iIIIIIIii! ~SS~SS~ IIiiiIIiIi SSS~S~S DDDDD[)DDD UU UU DDDDDDDDDD UU UU DD DD UU UU DD DD UU UU DD DD UU UU DD DD UU UU DD DD UU UU D D D D U U U U D D D L~ U U U U D D D D U iJ U U DDDDDDDDDD UUUUUUUUUUUU DDDDDDDDD UUUUUUUUUU MM MM HHM HMH H F1 H H FI F1 H H Ht"I HH HH HH M M H M H M Fi M Fi H Fl H F1 H J'J J"J HJ"I MM HH H H H Fi HH HH HH MM HH PPPPPPPPPP~ PP ~ pp ~ PP 9999999999 999999999999 99 99 99 99 99 99 999999999999 999999999999 99 99 99 99 999999999999 9999999999 2222222222 222222222222 22 22 22 22 22 22 22 22 22 222222222222 222222222222 NH NH NH NN NNN NH NNNN NN NN NN NN NN NN NH NN NN NH NN NH NN NN NN NN NN NNNN NN NNN NN NN 00000000 0000000000 O0 O0 88 88 O0 O0 88 88 O0 O0 88 88 O0 O0 88888888 O0 O0 88888888 O0 O0 88 88 O0 O0 88 88 O0 O0 88 88 O00O'O00000 888888888888 00000000 8888888888 000000000000 VV VV 000000000000 VV VV O0 O0 VV VV O0 O0 VV VV O0 O0 VV VV O0 O0 VV VV O0 O0 VV gV O0 OO VV VV O0 O0 VV VV O0 O0 VV VV 000000000000 VV 000000000000 VV AA AA AA AA AA AA AR AA AA AAAAAAAAAAAA AAAAAAAAAAAA AA AA AA AA AA AA AA AA 9999999999 999999999999 99 99 99 99 99 99 999999999999 999999999999 99 99 99 99 999999999999 9999999999 MM i"i H ii H H H Fi It t'lJ HH MM t, iH ~ NH HHHH MM HH HH HH MM HM HH t'itt O00OOOOO 000000000 O0 O0 O0 O0 O0 O0 O0 O0 000000000, 00000000 REEL HEADER Previous reel: Date: 9071l?02 Comment~: HEADER Origin: RECORDS Reel namm: 532191 Page Continuation I I TAPE · HEADER Service name: &GSFO1 Previous tape: Date: 9071i/02 Comments: Origin: Tape name: 532i91 Continuation #: O1 FILE HEADER File name: .001 Service name: Version Date: Maximum length: 1024 File type: LO Previous ?ile: I NFORMAT I ON RECORDS I'1N E !'1 CN W N FN COUN STAT CTRY AP iN LAT i LONG SECT T 0 W N RAI'.IQ EK8 E [>F EG[_ PD LMF DMF RUN TIME [)ATE LOC SOH L U N FL LUL ENGi WI TH D D DL CBD i CSLi TLI 8LI Tu~ TLA8 8HT MT DFD HV I S DFPH DFL RM RMF NFST MFSS RMC C 0 N T E N T S UNIT BP EXPLORATION P-J9 PRUDHOE BAY [>ATE LOGGEu NORTH SLOPE ....... PlLH:SKR ....... USA ....... '22094. 000 .................. 0 Deq, 0 Min, O, 0 Smc 0 De~ 0 Min. O, 0 Smc 31 ..... 11N .... i~E .... 0.000.. 92,020, 54,000 ........ HS ............ DF ............. L)P ............... i I i ~ I i I I i , , , i m I l 2144,000 ........... 22,." i 0/90 ......... 30 ............... 532191 ...... 7611/51 ~J..~': ....... NORTH SLOPE NORTH SLOPE ' ) '.'' ~ ' : · ,, RHN[ ELL/~HRBRL,,HcKH'r LEWiS/WELLS 10360.000 10362,000 9768.000, 9770,000, 9764,000, 10356,000 t600,000, 2144,000, 202,000,, 202,000,, LIGNOS CIRCULATED 9.500. 4i,000 4,200, 3.200. 1.820. 2.140, 56,500 HEAS, . 2.360 ........ APl i 0-2:--'&24-90 .... i I I I I · i i i i I i I i~# i · !i it .i iI I . , .1. , ,, II ~, ,I . , , . , , i , , , , , i , i , I, ,. ,I . , , . . i I i t i i I , i i , I I i Ii Ii ii i , I i i i i i I I lIli · , i IilIi m IllII i I , NUH: 50-029-22094-00 ........... t i i I i , i . · ! 1, , l i i IIlII IIII ,,il .liilliiiilIli,i lilt IIII I ,it,lilll ,IIIIIIll FT FT FT FT FT FT FT FT FT HR HR DEQF DEQF LB/Q CP OHHH OHMM DEGF OHMH TYPE CRTG 0 0 0 0 0 0 0 0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 0 0 3 3 4 I SIZE 40 40 40 '20 20 20 4 34 34 2 3 4 4 4 2 2 2 2 4 2 iO iO 20 20 20 20 4 4 4 4 4 4 4 4 4 4 20 ~U 4 4 4 4 4 4 4 12 4 CODE 65 65 65 65 65 65 65 65 6.5 68 65 79 68 65 65 65 65 65 65 65 68 68 68 68 68 68 68 68 68 65 65 68 G8 68 G8 68 6'8 65 G8 Page ERROR MHEM MCST MCSS I NFORMAT I ON RECORDS CONTENTS UNIT 70.300 .................................................. blESS ............................................. ~ 625 ~I IlIlIIIIIIIlmlIllJIlIIlIIImIlIIIIIiIiilIiWilIiieIii 6 750 I IWllllt/IIWIIlIIIlIIIlIlItIImllIlllllmIlIIIlIlIlmII DEGF TYPE CATG SIZE 4 i2 4 4 CODE 68 68 68 Page ERROR COMMEHT RECORDS Well [.ocat !,.Icl 1 Locmt !,.icl 1 l_ocat Wel 1 Locat &tel 1 Fi lm t,~el I Fi le. &Iai 1 Fi lm ion Comment l: SURFACE: 2319' ion Comment 2: ion Comment 3: ion Comment 4: Commmnt i: USED SAME GAMMA RAY Commmnt 2: Comment 3: FOR DOWN LOGS #1<10-22-90) & REPEAT DIL?8CS. FILES FNL & 2057" FEL THE FOLLOWING: DOWN LOGS #2(10-24-90) AND FOR MAIN ON TAPE: #1 = MAIN~ #2 = REPEAT~ Well Film Comment. 4: #3= DOWN LOGS #1~ #4 = DOWN LOGS #2 *:~ LIS tape written bp: ANCHORAGE COMPUTING CENTER .m mm All curve and tool mnemonics used are those which most closelp match mm :~:~ Halliburton curve and tool mnemonics, ~ HALLIBURTON TO SCHLUMBERGER TOP 80TTOM MNEH SERVICE UNIT MHEM SERVICE UNIT DEPTH DEPTH DEPTH FT DEPT FT 9750,00 10390,00 TENS DILBCS LBS TENS DILBCS LBS 9767,50 10390,00 SP DIL MV SP DIL MV 9767.50 10390.00 GR DILBCS AP1 GR DIL. BCS APl 9767,50 10390,00 CALl MSFL IN CALl MSFL IN 9767,50 10390,00 ILD DIL OHMM ILD DIL OHMM 9767.50 10390.00 ILM DIL OHNN ILM DIL OHMM 9767,50 1 0390, O0 NSFL NSFL OHNN MSFL MSFL OHMM 9767.50 1 0390. O0 DT BCS US/F DT 8CS US/F 9767.50 1 0390, OO TT1 8CS US TTI 8CS US 9767.50 10390,00 Page BCS' BCS BCS HRISDL OSH2 DSH2 DSN2 DSH2 SDL SDL SDL SDL SDL SDL SDL SDL HP.I HP, I HR! HP, I US US US GAPI CPS CPS DECP C,,'C DECP CPS CPS 6?03 IN OHMM TT2 TT3 TT4 FDSN NDSN NPH I NRAT DPHI DRHO FSDL NSDL PE PELC RHOB F:ALI H D R H D X HHR HMX HDRS BCS BCS BCS HRISDL DSN2 DSN2 DSN2 DSN2 SDL SDL SDL SDL SDL. SDL. SDL SDL HRI HR I HRI HRI HR I US US US GAPI CPS CPS DECP C?C DECF' CPS CPS G/C3 IN OHMM 9767 50 9767 50 9767 50 9767 SO 9767 50 9767 50 9767.50 9767,50 9767.50 9767.50 9767,50 9767.50 9767,50 9767.50 9767 .50 9767 50 9767 50 976.7 50 9767 50 9767 50 9767 50 0390 O0 0390 O0 0390 O0 0J90 O0 0390 O0 0390 O0 0390 O0 0390 O0 0390 O0 0390 O0 0390 O0 0390 O0 0390, O0 0390 O0 0390 O0 0390 O0 0390 O0 0390 O0 0390 O0 0390 O0 0390 O0 HMRSI DFL1 SPI TENSI DLOD1 HRI HRI HRI HRISDL HRISDL OHMM OHMM MV LBS COMMEN HHRS HRI DFL HRI SP HRI TENS HRiSDL DLOD HRISDL T RECORDS OHMM 9?6?° 50 10390. O0 OHMM 9767.50 1 0390. O0 MV 9767.50 1 0390. O0 LBS 9767.50 10390. £10 9767.50 i0390.00 Page DA T~. FORM~ ENTRY BLOCKS .~*: ~:~ EN TRY lIII'IlltllllIIlllIlIIIlIIlIIlIlII OIIIIIllIllIIIIIIIIlIIlIIIlIIIIllI T SPEC I F I CA TYPE SIZE CODE ~..~m:~ ENTRY 8LOCK LEGEND TYPE DESCRIPTION 16 Datum s~eci?icmtion 0 Termina or ( no more block sub.-t~pe entries ) 0 i 66 TIONS Pag~ QATA FORMAT oPEC I F I CA T IONS Pag~ · e*** [>ATUH 9PEClFICATiON 8LOCKS **** SERVICE SERVICE MNEH iD ORDER # AP1 APl AP1 APl FILE UNIT LOG TYPE CLASS MOD # PRC # SiZE LVL SHPL RC PROCEgS iNDiCA DEPT 532191 TEHS DILDCS 532i9i SP DIL 532i91 GR DiLDCS 532i9! CALl MSFL 532i9i ILD OIL 5J2i9i ILH DIL 532i9i MSFL MSFL 5~2i91 DT BCS 5~2i9i TTi BCS 5S2i91 TT2 BCS 532i9i TT3 8CS 5~2i9i TT4 8CS 5~219i GR HRiSDL 5~i9i FDSN DSN2 5~2i9i NDSN DSN~ 532i9i NPHI DSN2 5S2i9i HRAT DSH2 532191 DPHI SDL 5~2i91 DRHO SDL 5~2i9i FSDL. SDL 5~2i91 HSDL SDL 5~2i9i PE SOL 532i9i PELC SDL RHO8 SDL 53~i~1 CALI SOL 53219i HDR HRI 5~2i9i HDX HRI 532i9i HHR HRI 5~219i HHX HRI 5~2191 HDRS HRI' 5~191 HHRS HR! 5~2igi DFL HRI 5~i9i SP i.,tRI 53~i9i TENS HRISDL 5~19i DLOD HR~SDL 5~i9i FT 0 0 0 0 LBS 94 6~5 0 i HV 94 1 0 i i APl 94 31 0 IN 94 280 2 i OHMH 94 120 46 i OHHt'l 94 i~O 44 i OHHM 94 ~70 4 i US,-'F 94 5~0 ~2 i U~ 94 5~ ~ i US 94 52~ ,.z i US 94 5~ US 94 5~ ~APi 94 0 0 i uP._ 94 0 0 i CPS 94 0 0 i DECP 94 0 0 i C/C 94 0 0 i DECP 94 0 0 i G/CJ 94 0 0 i CPS 94 0 O i CPS 94 0 0 94 0 0 J 94 0 0 G/C~ 94 0 0 i I H 94 0 94 0 0 94 0 0 i 94 0 0 i 94 0 OHHH 94 0 0 i OHHH 94 0 0 i OHMN 94 0 0 1 HV LBS 94 0 0 94 0 0 1 0 4 0 i 68 0 4 0 i 68 0 4 0 i 68 0 4 0 I 68 0 4 0 1 68 0 4 0 i 68 0 4 0 1 68 0 4 0 i 68 0 4 0 i 68 0 4 0 i 68 0 4 0 I 68 0 4 0 i. 68 0 4 0 i 68 0 4 0 i 68 0 4 0 J 68 0 4 0 I 68 0 4 0 i 68 0 4 0 1 68 0 4 0 1 68 0 4 0 i 68 0 4 0 i 68 0 4 0 i 68 0 4 0 1 68 0 4 0 1 68 0 4 0 i 68 0 4 0 i 68 0 4 0 i 68 0 4 0 i 68 0 4 0 i 68 0 4 0 i 68 0 4 0 i 68 0 4 0 1 68 0 4 0 i 68 0 4 0 i 68 0 4 0 i 68 000000 000000 O00000 000000 000000 000000 000000 000000 000000 O00OO0 O00OO0 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 DEPT DT NPHI RHOB DFL TENS TTi NRAT CALl SP TT2 .DPHI HDR TENS DA GR II.~ DRHO HDX DLOD TR RECORDS CALl TT4 FSDL HMR ILD NSDL HN ,'4 ILM FDSN PE MSFL PELC HHR9 Page 1 039 0 0 -' L"* '.--t ~ --9 9 9 - .~.=~ 54 0200 84 2 5 I0100, 88, , 2, 9 , 9900, 88, -999, -.999, -999. .000 ,000 ,250 ,250 .250 , '000 ,250 .250 ,250 ,000 .000 ,232 ,gO9 ,653 000 lO0 271 ~97 148 000 800 250 250 250 000 200 250 250 250 2122.000 3i4,000 -999,250 -999,250 -999,250 4392,000 290,000 -999.250 -999,250 -999,250 4~57,000 315,000 4,904 6,730 269,493 4~43,000 317.000 5,766 6.974 265,499 4377,000 327,000 -999,250 -999,250 -999,250 4645,000 25~,000 -999,250 -999,250 -999,250 O. 000 330. OOO -999.250 -999,250 -999.250 -44.600 294,000 - 99'.-3,250 -99'3.250 -999,250 -60,500 3i 9,000 ,206 302.662 485.3.677 -86. 000 322. 000 ,i53 146, ,198 4996,432 -108,600 3~'~ 000 -999,250 -999,250 -999.250 -104,100 262,000 -999,250 -999,250 -999,250 0.000 495. O00 -999,250 -999,250 -9'99.250 19,700 432,000 -999.250 -999,250 26,300 480.00.0 ,019 80.777 1155,662 24.300 -,012 24,405 1245,900 21 .700 506,000 -999,250 ~9, 0 -999.250 71.000 372,000 -999,250 -999,250 -999,250 0o000 499,000 -999,250 -999,250 6,680 433,000 -999.250 -999.250 6.930 483,000 7628,672 ~36,883 6,950 483',000 6076,895 156.928 6,960 499.000 -~¥~,~DU -999,250 7,130 375,000 -999,250 -999,250 1.000 -999.250 -999,250 -999,250 2,767 -999,250 -999. 250 -999.250 2.483 30.673 15101,461 40,968 6,397 24.669 13937.734 8.329 11,858 -999,250 -999,25'0 -999,250 7,638 -999,250 -999,250 -999.250 i 00000,020 -999,250 -999,250 -999,250 3,236 -999,250 -999.250 -999.250 2.483 5098.768 2.496 2.496 6.123 3935.747 4.034 6,268 9.638 -999,250 -999,250 -999,250 7,534 -999,250. -999,250 -999.250 1 ,000 -999,25 0 -999,250 -999,250 10,423 -999,250 -999.250 -999.250 9.441 23219.977 2.407 2.629 ~5,171 21076.094 4.209 5.787 15.417 -99'9,250 -999,250 -999,250 5,754 -999.250 -999,250 -999,250 DATA RECORDS DEPT DT NPHi RHO~ DFL TENS TTi NRAT CALI SP TT2 DPHI HDR TENS GR TT3 DRHO HDX DLOD CALI TT4 FSDL HMR ILD N~DL HHX ILM FDSN PE HDRS MSFL NDSN HMRS Page 9800,000 55.700 -999,250 -999,250 -999.250 4542,000 ~¢'~,UUU -999.250 -999,250 -999,250 -i12,500 273,000 -999,250 -999,250 -999,250 77.400 399,000 -9'99.250 -999.250 -999,250 7,350 389. 000 -999.250 -999.250 46,989 -999.250 -999.250 -999,250 60,256 -999,250 -999.250 296,483 -':~.~.~, ~D U -999,250 FILE TRAILER Fil~ name: &G§FO1 . 001 Maximum length: t024 TRAILER RECORDS Fil~ type: LO Version #: Date: Page ~.'** FILE HEAl, ER **** File n~me: ,002 Service name: Version #: Dmte: Maximum length: 1024 File type: LO Previous f'ile: I NFORMAT I ON RECORDS Pag~ 11 M N E M CONTENTS UNIT TYPE CRTG SIZE CODE ERROR C: f..I W H Fi'4 C 0 U 1',i 9TAT U APIN LATi LONG SECT T 0 W 1',1 R A N G EK B EDF EGL PD LMF Dt'tF R U T.i blE [)ATE LOC SON L U N FL LUL ENG I WI TH DD DL CBDi CSL1 TLI BLI TCS TLA8 8HT MRT PISS DFD NV I S DFPH DFL RH RHF t4FST HFSS R t,l C BP EXPLORATION P-iS PRUDHOE BAY NORTH SLOPE ALASKA USA ....... 22094. OOO .................. 0 Drag, O Min. O. 0 ,mc 0 Dmg. 0 M in. O, 0 o 111',1 ....... I~E ..... 0,000.. , 9z, 020, , 54. 000, HS ..... DF ..... DF ..... 2144, OOu 22/1 0/90 532191 , ,7611 ,.;51939 , HORTH SLOPE HORTH SLOPE ': 1~ "': ' I'l ' R~-i N [: ELL,' ~ F~RBR .. ,' H ci'... R Y LEWIS/WELLS I 0360,000 1 0~62,000 9768,00 O, 9770,000, 9764,00 O. I 0356.0 0 0 1600,000, 2144,000, 2'02. 000,, 202· 000.. LIGNOS CIRCULATED 9,500. , 41 .000 . 4,200. , 3.200. . 1 ,820. , 2,140, , 56,500 , MEAS, 2,360 ........ IIII III! AP1 f.iLiM: 50-02'9-22094-00 ............... [:,ATE L l_l u is ir... 12 I I I I I I I I I I I I I I I I I I I I I I I I I · ! i i , iiimmi m I m Itl IilIillI iIlilltl illll ilill #llifliliIi iltii IIIIilllIiI Ii,ti illii , ,,,1·1! IIIIllItllIlIIII IIlIImIIIIIIIIII 0 0 0 0 0 0 0 0 0 0 u u 0 0 0 0 0 0 · 0 0 0 0 0 0 FT 0 FT 0 FT -0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FT 0 FT 0 FT .0 FT 0 3 FT 0 FT 0 HR 0 2 HR 0 4 DEGF 0 1 DEaF :0 1 0 2 0 2 LB,;'] O 2 CP 0 2 0 2 0 2 OIH hi i"'l l.i 2 0 H H H O 2 DEGF I0 2 0 2 OHHH 0 2 40 65 40 65 40 65 20 65 20 65 :-'U 34 65 34 65 2 65 3' 65 :3 65 4 6,9 4 6S 4 6',9 2 65 2 65 2 65 2 79 4 68 :8 65 2 79 lO 65 10 65 20 65 2.0 65 20 65 20 65 4 4 68 4 68 4 68 4 '68 4 68 4 68 4 68 20 65 20 65 4 68 4 68 4 68 4 68 4 68 4 68 4 68 12 65 4 68 MNEM HCST HCSS CS BS I HFORMAT 1 ON RECORDS COI-,IT ENTS UNIT 70.300 .................................................. HEAS ............................................. 7.625 6.750 ................................................... DEGF TYPE CATG SiZE 4 i2 4 4 CODE 68 Page ERROR COMMENT RECORDS We 1 W e 1 W e 1 We 1 We 1 1 Location Comment 1 Location, Comment 1 Location Comment 1 Location Comment 1 File Comment $: 1 File Comment 2: 1 File Comment 3: 1 File Comment 4: l: SURFACE: 2319' FNL & 205?' FEL 4: USED SAME GAMMA RAY FOR THE FOLLOWING: DOWN LOGS #1<10-22-90) & DOWN LOGS #2<10-24-90) AND FOR MAIN & REPEAT DIL?BCS. FILES ON TAPE: #! = NAIN~ #2 = REPEAT~ #3= DOWN LOGS #1; #4 = DOWN LOGS #2 LIS tape written by: ANCHORAGE COMPUTING CENTER All curve and tool mnemonics used are those which most closely match Halliburton curve and tool mnemonics, HALLIBURTON TO SCHLUMBERGER TOP BOTTOM MNEM SERVICE UNIT MNEM SERVICE UNIT DEPTH DEPTH Page 13 DEPTH FT DEPT FT 9750,00 TENS2 D ILBC'S LBS TENS DILBUo LBS 9767,50 SP2 [)IL MV SP [)IL. MY 9767.50 GR2 DILBCS AP1 GR DILBCS APl 9767.50 CAL I2 MSFL IN CALI MSFL IN 9767,50 ILD2 DIL OHMM IL[) DIL OHMM 9767,50 ILM2 OIL OHMM ILM DIL OHMM 9767.50 HSFL2 MSFL OHMM MSFL MSFL OHMM 9767.50 DT2 BCS ".q '" C"" . u~r DT B~o US/F 9767 50 TT12 BCS US TT1 8CS US 9767.50 10390 O0 10390 O0 I 0390 O0 1 0390 O0 10390 O0 10390 O0 10390 O0 1 0390. O0 10390, O0 1 0390, O0 TT22 TT32 TT4,2 BCS' BCS BCS US US US TT2' TT.'3 TT4 BCS BCS US US US ~767.50 ',~767.50 J 03'~0. O0 10390, O0 ! 03."30, O0 DA TA ENTRY BLOCKS ENTRY FORMAT oPECIFICA TYPE SIZE CODE i6 1 66 TIONS Pag~ ENTRY BLOCK LEGEND TYPE DESCRIPTION Datum zpmci¢ication block sub-t, ypm Tmr. mina~or~ ( no morm mntr. ims ) ' DATA FORMAT SPECIFICATIONS Page DATUM SPECIFICATION BLOCKS MNEM SERVICE SERVICE AP1 AP1 AP1 AP1 FILE ID ORDER # UNiT LOG TYPE CLASS MOD # PRC # SIZE LVL SMPL RC PROCESS iNDICATORS DEPT 532i91 TENS DILBCS 532i9i SP DIL 532i9i GR DiLBCS 532i9i CALl MSFL 532i9i ILD DIL 53~19! ILM DIL 53219i MSFL MSFL 532191 DT BCS 53~i9i TT1 BCS 532i91 TT2 8CS 53~i91 TTJ BCS 532i9i TT4 BCS 532i91 FT 0 0 LBS 94 G~5 MV 94 iO API 94 3i0 iN 94 280. OHMM 94 i20 OHMM 94 120 OHMM 94 270 US/F 94 520 US 94 522 US 94 522 US 94 522 US 94 522 0 0 2 0 3 i 1 3 1 i 3 i 2 3 i 46 3 i '44 3 1 4 3 i 32 3 i 32 3 i 32 3 i 32 3 i 32 3 i 4 0 1 68 4 0 i GS 4 0 I G8 4 0 i 68 4 0 i Ge 4 0 ! G8 4 0 I 68 4 0 1 68 4 0 i 68 4 0 ! 68 4 0 I Ge 4 0 i 68 4 0 1 68 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 0.00000 000000 RECORDS DEPT TENS TTi SP TT2 GR ii~ CALI TT4 ILD ILM MSFL Page 10390.000 0.000 10300.000 80.900 10200.000 84,200 10100.000 87.800 10000.000 93.~00 9900,000 87.900 9800,000 55.600 2049.000 315.000 4337.000 290.000 4338.000 315,000 4335.000 317,000 4360,000 328.000 4647,000 252,000 4589,000 280.000 0.000 329,000 -44.600 294,000 -60.500 320.000 -86.000 321.000 -108,600 333.000 -104.100 260.000 -112.500 272,000 0.000 496.000 19.700 432,000 26.300 480.000 24.300 483,000 21,700 505,000 71.000 37i.000 77,400 388.000 0.000 499.000 6.390 434.000 6.870 482.000 6.880 484.000 6,890 500.000 7,060 374.000 7,280 389.000 1 ,000 2,564 2.382 6. 383 11 .940 7.621 45.604 100000.020 2.735 2,443 6,109 9.661 7.534 63.241 1.000 10.765 9.727 15,417 14.723 5,383 267.917 **** FILE TRAILER **** F~le name: &GSFO! , 002 Maximum length: i024 TRAILER RECORDS Versi on #: File type: LO Next ~ile: Date: File name: ,003 Service name: Version #: Date: Maximum length: 1024 File type: LO Previous ~ile: MNEM CN W N FN COLIN STAT CTRV AP i N LATi LONG SECT TOWN RANG EK8 EDF EGL_ PD LHF DHF ~iJN T[ttE D~TE LCC SON LLiN FL. LUL EN~ ~ i.d [ T N DD DL CBD1 CDL ~ TL[ BL,[ TCS TL~D BHT HET HT HSS DFD NV [ S DFPH DFL EH EMF HFST HFSS RHC I NFORHAT I ON RECORDS CONTENTS UH I T 8P EXPLORATION PRUDHOE BAY NORTH SLOPE ALASKA USA 22094 ,,.: 0 Drag u 0 Drag 0 1 iN. , 13E.. 0,000 92 020 54 000 MS ,.. DF . , . DF . . . I . 2i44:6oo , 22/1 0/90 . -0 532191 , , 7611251939 , . NORTH SLOPE NORTH SLOPE RANDELL/'YARBRO,:HcKAY LEWIS/WELLS 10360.000 ., , I0362.000 ., , 9768,0 0 0 .... 9770. 000 .... 976,1.000 .... I 0356,000 . , , 1600,000, .,, 2144,000 .... 202,000 ..... 202,000 ..... · i,.-.o LIGNOo CIRCULATED 9,500 ....... 41 ,000 .... .. . 4,200, .,.. , 3,200 ..... 1 ,820 ..... 2,140 ..... 56.500 .... MEAS. , 2.360 ........ 000 ..... 0 Hin 0 Min , , · · AP i NUH: DATE LOGGED 0 Sm< 50-029-22094-00 ................ , ! ~, m m m m m ! · m · m m m , m J , FT FT FT FT FT FT FT FT FT HR DEGF DEGF LB,;G UP' OHHH OHHH DEGF OHMH TYPE CATG SIZE 0 0 40 0 0 40 0 0 40 0 0 20 0 0 20 0 0 20 0 0 4 0 0 34 0 0 34 0 -0 2 0 0 0 0 3 0 3 4 -0 3 4 0 3 4 0 3 2 · 0 3 2 0 0 2 0 'O 4 0 0 · 0 0 2 0 0 10 0 0 1 0 0 0 2 0 0 0 20 0 0 2 0 0 0 20 0 3 `1 0 3 4 0 3 4 0 3 4 0 3 0 2 4 0 4 4 0 1 0 1 4 0 2 20 0 2 20 0 2 0 2 4 0 2 4 0 2 4 0 2 4 0 2 4 0 2 12 0 2 CODE 65 65 65 65 65 65 65 65 65 68 68 68 65 65 65 79 65 65 65 65 65 68 68 68 68 68 68 68 68 68 65 65 68 68 68 68 65 68 Page ERROR INFORMA TION RECORDS Page MNEM MCST MCSS CS BS CONTENTS 70.:300 .................................................. MEAS ............................................. 7.625 ................................................... 6.750 ................................................... UNIT DEGF TYPE CATG SIZE 4 12 4 4 CODE 68 ERROR C 0 M M E N T RECORDS Well Location Comment 1: SURFACE: 2319' FNL & 2057' FEL Well Location Comment 2: Well Location Comment 3: Well Location Comment 4: ~lell File Comment l: USED SAME GAMMA RAY FOR THE FOLLOWING: Well File Comment 2: DOWN LOGS #1(10-22-90) & DOWN LOGS #2(10-24-90) AND FOR Well File Comment 3: & REPEAT DIL?BCS, FILES ON TAPE: #1 = MAIN; #2 = REPEAT; Well File Comment 4: #3= DOWN LOGS #!; #4 = DOWN LOGS #2 MAIN ~,~ LIS tape written b..v: ANCHORAGE COMPUTING CENTER ~ :+:* All curve and tool mnemonics used are those which most closelp match ** ** Halliburton curve and tool mnmmonics, ** HALLIBURTON TO SCHLUMBERGER TOP BOTTOM' MNEM SERVICE UNIT MNEH SERVICE UNIT DEPTH DEPTH DEPTH FT DEPT FT 9750, (l'O 10390. O0 GR3 DILBCS GAPI GR DILBU~ GAPI 9?60 O0 10360,00 FDSN3 DSN2 CPS FDSN DSN2 CP~ 9760. O0 10J60 O0 NDSNJ DSN2 CPS NDSN DSN2 CPS 9760. O0 10360. O0 oN~ DECP 9760 O0 10o~0 O0 NPHI3 DSN2 DECP HPHI D'~ ~' . ~' . NR~T3 DSN~ C/C NRAT DSN2 C/C 9760.00 10360.'00 DPHI3 SDL D. ECP DPHI SDL DECP 9760.. O0 I 0~60. O0 DRHO~ SDL ~/C3 DRHO SDL ~/C3 ~760,00 10360.00 FSDL~ SDL CPS FSDL SDL CPS ~760. O0 1 0360. O0 NSDL3 SDL CPS NSDL SDL CPS 9760,0'0 10360. O0 Page PE3 PELC3 RHOB3 HDRS HDX3 HMR~ HMXJ HDRSJ HMRS3 DFL3 SPJ TENSJ SDL SDL SDL HRI HRI HRI HRI HRI HRI HRI HRI HRI SDL OHMM OHMM OHMM MV LBS PE PELC RHO8 HDR HDX H MR HM X HDRS HMRS DFL SP TENS SDL SDL SDL HRI HRI HRI HRI HRI HRI HRI HRI HRI SD L OHMM OHMM OHMM MY LBS 976 976 976 976 976 976 976 976 976 976 976 976 0 O0 0 O0 0 O0 0 0o' 0 O0 0 O0 0 O0 0 O0 0 O0 0 00- 0 O0 0 O0 0360. O0 0360. O0 0360. O0 0360 O0 0360 O0 0360 O0 0360 O0 0JG0 O0 0360 O0 0360 O0 0360 O0 0360 O0 DA TA E H T R Y FORMA T SPEC I F 1 CA TYPE SIZE CODE 16 i 66 TIONS Page 21 ENTRY BLOCK LEGEND TYPE DESCRIPTION 16 Datum specification block zub-t.~pe 0 Terminator ( no more entries ) DATA FORMA DATUM SPECIFICATION BLOCKS *-**.* T SPEC I F I CAT IONS SERVICE SERVICE AP1 AP1 APl API FILE MNEM ID ORDER # UNIT LOG TVPE CLASS MOD # DEPT 532191 FT 0 0 0 0 GR DILBCS 532i91 GAPI 94 0 0 2 FDSN DSN2 532i 91 CPS 94 0 0 2 NDSN DSN2 532191 CPS 94 0 0 2 NPHI DSN2 532i 91 DECP 94 0 0 2 NRAT DSN2 53219i C/C 94 0 0 2 DPH! SDL 532191 DECP 94 0 O 2 DRHO SDL 532i91 6/C3 94 0 0 2 FSDL SDL 532i9i CPS 94 0 O 2 NSDL SDL 532i91 CPS 94 0 0 2 PE SDL 532191 94 O O 2 PELC SDL 532i9i 94 0 0 2 RHOB SDL 532i91 ~/C3 94 0 O 2 HDR HRI 5~2i9i 94 0 0, 2 HDX HRI 532i9i 94 0 0 2 HMR HRI 5~2i9i 94 0 0 2 HM~ HRI 5~2i9i 94 0 0 2 HDRS HRI 5~2i9i OHMM 94 0 0 2 HMRS HRi 532i9i OHM~ 94 0 0 2 DFL HRI 532191 OH~M 94 '0 0 2 SP HRI 5J2i91 MV 94 0 0 2 TENS HRISDL 53219! LBS 94 0 0 2 PRC # SIZE LVL SMPL RC PROCESS INDICATORS 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 00'0000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 Page DATA RECORDS DEPT GR FDSN NDSN NPHI NRAT FSDL NSDL PE PELC RH08 HDR HHX HDRS HHRS DFL SP TENS 10:360.000 0.000 -999,250 -999,250 -999.250 2720.72:9 5661 . 443 . 707 . 733 , 759 6~, 132 1,925 I ,847 :3. 592 209,036 'I0~00.000 8699.@i6 42,439 10200.000 82i9.467 43,997 10100,000 7547,753 i7,133 10000.000 940,4,746 4.276 19 16784 2 26 16834 2 24 16373 21 12 ?! 16211 9900,000 6496,620 · 700 5525 . 760 24024 , 039 . 220 ,918 2.0'9-31 2, i91 2.268 , 520 2,622 4 , 933 2i 0 , 062 DPHI HDX .300 5107,623 23245,848 ,231 ,082 2,149 2,216 2,320 ,386 2,433 4,690 2i6,490 ,300 4399,053 22i89, i25 ,260 445 2,756 3,004 2,342 ,832 6,404 9.929 212.543 ,700 3,921 ,646 21.382.102 ,29i ,023 2,384 2,64.3 2.207 ,974 10,22:3 11,508 217.920 , 000 4029,870 19598,._'395 ,253 , 6."31 2,586 2,624 2,467 , 74 0 6 , 3:31 7 , 993 254 , 40i 9800,000 77,400 12778,879 27240,754 ,077 .3962,75! 14165,682 4,25i 4,308 2,69i 2,075 47.691 23.793 323,286 290,539 -999,250 375.747 1998.573 4,682 30i.655 1998,573 4.901 311,667 2463,549 5.431 134,347 2472,692 6,025 66,367 2526,768 5.250 ! 02,254 2:351 , 060 2.297 23,399 2198,430 ,057 i i2,980 ,232 77,676 ,200 79,237 , 23.600 .269 2,002 ,11i 16,178 -, 025 - q93 DRHO HHR ,033 ,029 334,639 ,04'8 354.803 147. 150 .015 85.561 .057 124.0ii -.000 14.385 Page 2'; File name: ~GSFO! , 003 Maximum length: i024 TRAILER RECORDS Version #: File tppe: LO Nmxt f'ile: Date: Page ¢ File name: .004 Service name: Version Date: Maximum length: i024 File type: LO Previous ~ile: M H E H c: N td t,i FN COUN 9TAT CTR:¢ AP i N LRTi LONG SECT T 0 W N RANG EKB EOF EGt_ LHF BMF RUN TiblE DATE LCC SON LUN Fl_ LUL E N ~'.~ I WI TN DD DL CBD 1 CBI_I TLI BLI TC,S TLA8 BHT MT MSS BFQ HV i S DFPH DFL Ri'iF MFST HFSS RHC I NFORMAT I ON RECORDS CONTENTS UNIT BP EXPLORATION P-t9 AP1 PRUDHOE BAY [)ATE NORTH SLOPE ALASKA USA 22094. 000 .......... 0 Dmq, 0 Min, 0 0 Dm~ 0 Min. 0 i 1H. , . i~E, , , 0.000. 92 020 54 000 MS . . . DF . . . i . 2i44'oo0 22,.; 1 0/9 o 5~2191 761 i/5i 939 NORTH SLOPE HORTH SLOPE RANDELL/YARBRO/McKAY LEWIS/WELLS i0360.008 ,. . 10362.000 ., 9768, O 0 O, , , 9770,000, , , 9764,000, , , 10356.000 . . 1608,000, , 2i44,000, , , 202. OOO .... 202, O00 .... L I 6NOS CIRCULATED 9,500 ..... 41 . OOO .... 4,200 ..... 3,200 ..... i ,820 ..... 2,140 ..... 56.500. , ,', HERS, 2, i ~ m~ m I I · I m m ~ 360 .......... ~ m · m NUM: 50-02g-22094- O0 ................ LOGGEO ~ 0-22&24-90 ................ illlllm lIlllIlllllllflmlilliiliIlI! ilIiIIi ilIilillilltIllilIlIilliIliI IIIIIii IIIlIIIIIiiitiiIllIiiIiiliii Illl}Il 0 ~mc ...................... 0 S~ ~ ........................ m i m m · t i i i TYPE C A TG SIZE 0 0 40 0 0 40 0 0 40 0 0 20 0 0 20 0 0 20 0 0 4 0 0 34 0 0 34 0 0 2 0 0 3 0 O 3 FT 0 :3 4 FT 0 .3 4 FT 0 3 4 0 :3 2 0 3 2 0 3 2 0 0 2 0 0 4 0 0 8 0 0 2 0 0 10 0 0 10 0 0 20 0 0 20 0 0 20 0 0 20 FT 0 3 4 FT 0 3 .4 FT 0 3 4 FT 0 3 4 FT 0 :3 4 FT 0 :3 4 HR 0 2 4 HR 0 4 4 DEGF 0 i 4 DEGF 0 1 4 0 2 20 0 2 20 LB,"G 0 2 4 CP 0 2 4 O 2 4 0 2 4 0 H H bi 0 2 4 OHHM 0 2 4 DEGF 0 2 4 0 2 12 OHHH 0 2 4 CODE 65 65 65 65 · 65 65 68 68 65 65 65 79 68 65 79 65 65 65 65 65 65 68 68 68 68 68 6'-" 68 68 68 65 65 68 68 68 68 68 68 65 68 Page ERROR 2.' MNEM MCST MeSS CS BS I ~FORMAT I ON RECORDS COHTEHTS UNIT 70,:300 .................................................. ME~S ............................................. 7'.625 ................................................... 6,750 ................................................... DEGF TYPE CATG 2 2 3 3 SIZE 4 i2 4 4 CODE 65 . -- Page ERROR 2~ COMMENT RECORDS Wmll Location Comment !~mll Location Comment Wmll Location Comment &fell Location Comment Well File Comment hlell File Comment Ymll File Comment l: SURFACE: 2319' FNL & 205?' FEL 3: USED SAME GAMMA RAY FOR THE FOLLOWING: DOWN LOGS #1(10-22-98) & DOWN LOGS #2(10-24-90) AND FOR MAIN & REPEAT DIL?BCS. FILES ON TAPE: #! = MAIN~ ~2 = REPEAT~ Well File Comment 4: #3= DOWN LOGS #i~ #4 = DOWN LOGS ~2 m. LIS tape written by: ANCHORAGE COMPUTING CENTER m. All curve and tool mnemonics used are those which most closel~ match ** Halliburton curve and tool mnemonics. HALLIBURTON TO SCHLUMBERGER TOP BOTTOM MNEM SERVICE UNIT MNEM SERVICE UNIT DEPTH DEPTH ili DEPTH FT DEPT FT 9?50,00 10390.00 GR4 DILBCS GAPI GR DILBCS GAPI 9760.00 10236.00 FDSN4 DSN2 CPS FDSN DSN2 CPS 9760.00 10236o00 NDSN4 DSN2 CPS NDSN DSN2 CPS 9760,00 10236,00 NPHI4 DSN2 DECP NPHI DSN2 DECP 9760.00 NRAT4 DSH2 C?C NRAT DSN2 C?C 9760.00 DPHI4 SDL DECP DPHI SDL DECP 9760,00 10236o00 DRH04 SDL G?C3 DRHO SDL G/C3 9760,00 I0236,00 FSDL4 SDL CPS FSDL SDL CPS 9760,00 10236.00 NSDL4 SDL CPS NSDL. SOL CPS 9760,00 Page PE4 PELC4 RHOB4 HDR4 HDX4 HMR4 HMX4 HDRS4 HMRS4 DFL4 ' SP4 TEl,IS4 SDL SDL SDL HRI HRI HP, I HRI HRI HRI HRI HRI HRISDL G,."C3 OHMM OHMM OHMM MV L~S PE PELC RHO8 HDR HDX HMR HMX NDRS HHRS DFL SP TENS S [:L S DL SDL HRI HRI HRI HRI HRI HRI HRI HRI HRI SDL G/C3 OH~ OH~ LBS 9;:'6 976 '976 976 976 976 976 97'6 976 976 976 976 0 O0 0 oo 0 O0 0 O0 0 O0 0 O0 0 O0 0 O0 0 O0 0 O0 0 O0 0.00 0236. O0 0236, O0 0236,00 0236. O0 0236,00 0236, O0 023r-S, O0 0236, O0 0236,00 0236, O0 023~;, 00 0236, '00 DA TA ENTRY BLOCK~ '~:~-'~ ENTRY F 0 R M A T SPECIFICA TYPE SIZE CODE 16 1 66 TIONS Page 2,'.' ENTRY BLOCK LEGEND ~:~ TYPE DESCRIPTION 16 Datu~ sBeci¢ication block sub-type 0 Terminator ( no mope entries ) DATA F 0 R M A DATUM SPECIFICATION BLOCKS SERVICE SERVICE API API MNEM ID ORDER # UNIT LOG TYPE T m=% oPEC I F I CA DEPT 532191 FT 0 0 OR DILBCS 53219i QAPI 94 0 FDSN DSN2 532191 CPS 94 0 NDSN DSN2 532191 CPS 94 0 NPHi DSN2 53219i DECP 94 0 NRAT DSN2 532i9i C/C 94 0 DPHI SDL 53~191 DECP 94 .0 DRHO SDL ~32i9i ~/C3 94 0 FSDL SDI. 53~i9i CPS 94 0 NSDL SDL 532i91 CPS 94 0 PE SDL 532i91 94 0 PELC SDL 53219i 94 0 RHOB SDL 532i91 G/C3 94 0 HDR HRI 532191 94 0 HD× HRI 532i91 94 0 HMR HRI 53219! 94 0 HMX HRI 532191 94 0 HDRS HRI 53219i OHMM 94 HMRS HRI 532191 OHbiM 94 DFL HRI 532i91 OHblM 94 0 SP HRI 53219! MV 94 TENS HRISDL 53219! LBS 94 0 API RPI FILE PRC # CLASS MOD # SIZE LVL SHPL 0 0 4 4 0 1 0 2 3 4 0 i 0 2 3 4 0 1 0 2 3 4 0 0 2 3 4 0 0 2 3 4 0 i 0 2 3 4 0 1 0 2 .3 4 0 i 0 2 3 4 0 i 0 2 3 4 0 i 0 2 3 4 0 1 0 2 3 4 0 i 0 2 3 4 0 1 0 2 3 4 0 i 0 2 3 4 0 1 0 2 3 4 0 0 2 3 4 0 i 0 2 3 4 0 1 0 2 · .:, 4 0 1 0 2 3 4 0 0 2 ~,= 4 0 1 0 2 3 4 0 TIONS RC G8 68 68 68 68 G8 Ge G8 G8 68 68 68 G8 68 PROCESS iNDiCATORS 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000' 000000 000000 000000 Page 2~ DEPT FSDL Ht'l ~'' ¢'% 0236, 000 8956. ?83 11 , 472 0200. 000 80?3,005 4J , 703 1 01 00,000 8E, 72.869 25,585 10000,000 1 0509,596 6. 179 9900, 000 7802,886 9.753 9800, '000 60R2~ ,0 J 4 1.110 DATA RECORDS (IR NSDL HDRS F 0 S N PE HHRS ND SH PELC DFL NPH I RHO8 SP NRAT HDR TENS DPH I HDX DRHO 22. 000 17005. 187 5,173 26.300 16318.279 2,4i9 24,300 17170,293 6,141 21,700 17555,023 13,564 7I .000 lv5.~ 406 9.168 77,400 16030,410 45,344 4756, 2, 5, 4756, 2, 2. 4103, 3, 5, 4475, 2. 10, 3848. 3, 8, 13879, 4, 31, 229 676 195 229 -- ._ 525 877 .375 780 368 847 099 396 060 570 951 402 594 22154 22154 2 5 21395 3 JO 22027 3 i1 19828 3 14 26774 4 247 .383 .i7i ,608 ,383 .766 .282 ,152 .1GJ ,348 .038 ,439 ,789 .318 ,889 .910 ,502 ,065 ,238 2.334 322.694 ,238 2,360 316,550 ,269 2.362 306.266 .249 2,242 309. 444 ,265 2,418 2,537 . O62 2,578 364,535 5.016 i50.887 254 i . 043 5,016 306.392 2541 , 043 5.614 14i.445 2541.043 5,301 63,895 2541,327 5,550 97,335 2536,624 2,077 21,205 2344,939 .192 27,705 ,176 .174 33,07 0 ,247 4.619 ,140 19.267 .044 .918 .111 34i.82i ,159 155,246 ,143 88.752 ,144 1 08,327 .162 16,004 Page :~.:~** FiLE TRAILER Fi le name: &GSFO1 .004 Maximum length: 1024 TRAILER RECORDS Version #: File type: LO Next f"ile: Date: Page REEL TRAILER Service name: &~SFO1 Next reel: Date: 90/11/02 Commentz: Origin: Reel name: 532191 Continuation #: O1 **** TAPE TRAILER Service name: &OSFO1 Date: 90/11702 Origin: Tape 532191 Continuation #: Ol Next tape: Comments: COMPANY NAME WELL NAME : P-19 FIELD NAME I PRUDH( BAY BOROUGH : NORTH OPE STA?E R , API NUMBE~ : 50-02;:-22094-009 REFERENCE NO ~ ?424 I CROFILMED RECEIVED JAN 1 5 1991 Alaska Oil & Gas Cons. Commission Anchorage Ih Tape Verification Listing chlUmberqer Alaska Computing CeDter 20-DEC-1990 14:26 **** REEL HEADER **** SERVICE NAME : EDIT DATE ~ 90/12120 ORIGIN I FLIC REEl. NAME : 74249 CONTINUATION # PREVIOUS REEL CO,,ENT ~ BP EXPLORATION.PRUDHOE BA¥,P-19.50-029-22094-O0 **** TAPE HEADER SERVICE NAME ~ EDIT DAT~ I 90/12/20 ORIGIN I FLIC TAPE NAME .~ I 74249 CONTINUATION # t i PREVIOUS TAPE COMMENT I BP E~PL~RATION,PRUDHOE **** FILE HEADER **** FILE NAME : EDIT ,001 SERVICE : FLIC VERSION : 001A06 DATE I 90/12/20 MAX REC SIZE I 1096 FILE TYPE ~ LO LAST FILE ~ PAGE: COMPANY NAME: BP EXPLORATION WMLL~ P-19 F~ELD~ PRUDHOE BAY BOROUGH'~ NORTH SLOPE STATE~ ALASKA API NUMBER~ 50-029-2~094-00 LOCATION: ~3t9' FML & 2057~ FEb SECTION~ 31 TOWNSHIP~ P~RMANENT DATUM~ ~SL ELEVATION~ 0 LnG ~EASU~ED FRO~ DF 92 RANGE~ ABOVE PERMANENT DATU~ I8 Tame Verification Listing ,Cblumberoer AlasKa Computing Center 20-DEC-1990 14:26 PAG~~ E[~EVATIONS KB: DATE LOGGED: ~b RUN NUMBER~ 1 TD DRILLER: 10236 T~ LOGGER: 10235 DF: 92 GL: 53.99999 BTT SIZE 1: 8,75 BTT SIZE 2: 7 BIT SIZE 31 TUBING TYPE FLUID IN HOLE~ DENSITY~ BRXNE 9,199999 LOGGING DISTRICT) LOGGING ENGINEER) WITNESSI 4615 JOHNSON PARKER TOOL NUMBERSl CAL-YA-1592 SGC-SA-27 CAE-AT CAE-AU CAE"AT CES$'A'758 TCC-B"420 CBC-DB'uu CBS'CB'B6 CEEC'"A'832 FIELD REMARKS~ TIED, TO HLS SONIC DATED 10-22-90 WELL NOT PERFORATED RAN A 2,5" CNL ON SANDSTONE MATRIX DATE JOB STARTED: 20-DEC'90 jOB REFERENCE NOl 74249 LDP/ANA: R, SINES ****************************************************************************** FILE - EDIT,O0~ BP EXPLORATION PRUDHOE BAY P-19 50-029-22094-00 PASS ! THRU 4 AND HODGE$ LEHMAN AVERAGE NPHI DATA SAMPLED EVERY -.5000 FEET ,IS Tape Yerificat~on Listing ~chlumberqer Alaska Computing Center 20-DE'C-1990 14:26 TYPE CNT-AtD/H CNT-A/D/H CNT-A/D/H CNT-A/D/H CNT-A/D/H DATA INCLUDED - EXTENSION TOOL USED NAME PS1 COMPENSATED NEUTRON PS2 COMPENSATED NEUTRON PS3 COMPENSATED NEUTRON PS4 COMPENSATED NEUTRON HLA COMPENSATED NEUTRON PAGEI 3 TABLE TYPE = CONS CN BP EXPLORATION Companx Name FN PRUDHOE BAY F~lem W~ P-19 W id NameName APIN 50-029-22094-00 APl Serial Number FL 2319' FN5 & 2057' FEL Field Location SECT 31 Section TOWN lin Township RANG ~3E Rang9 COU~ ORTH SLOPE County STAT ALASKA 8tare or Prov~nce NAT! USA Nation LATI Latitude LONG Longitude WITN C PARKER Withess'.Name 3560 Service Order Number PDAT MSL EPD FT 0. ~'i~erman~nt datum Elevation. o~ Perm. Da LMF DF bo~ .easu'red from EDF FT 92. Elevat on o~ Derric~ EGL PT 53 ~9999 Elevation of Gr ~nd TDD rT iO~ .6 Total Depth - D~lller TDL FT 10235.. Total DePth - Logger BLi rT 10232, Bottom LOg Interval TLI FT 9745 Top Log Interval ~ DFT BRIN~ Drilling Fluid Type DFD G/C3 9.199999 Drilling Fluid. Densit DFP~ Drilling Fluid Ph DrY CP Dri final Fluid Viscos DFL F3 Drilllno Fluid boss R~$ OHMM Resistivity of Mud Sa MST DEaF Mud Sample Temperatur R~F$ OHMM Resistivity of mud fi MFST DECF Mud Filtrate Sample TUN! VALU DEr! TYPE ZONE ZONE ZONE ZONE ZOnE ZONE ZONE Tape Verification blstinO 20-DEC-1990 i4:26 PAGE~ 4 ichlumberoer AlasKa Computing Center TUNX VALU DEF! TYPE R~CS OHMM ~e$1stivit¥ o~ Mud Ca ZONE ~CST DEGF Mud CaKe Sample Tempe ZONE STE~ DEGF -20, Surface Temperature BHT DEGF Bottom Hole Temperatu ZONE TABLE TYPE : ZONE TUN! BDEP TDEP DFPH DFV DFL RMS MST RMF$ MFST R~CS ~CST FT 0, 0, O, O, O. O, O, O, O, O, . Ol TABLE TYPE ~ CURV DEFI DEPT Depth Channel Name NPHI Neutron PoroSity RTNR Raw Thermal Neutron Ratio TNRA Calibrated Thermal Neut.on Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC G~ Gamma TENS Tension CCL CCh AmplitUde-. NPH! ~eutron porosity ~NR Raw:Thermal_Neutron Ratio R~.~T RCFT CNTC CNTC CFtC CFTC GR Gamm Ray TENS Tension CCL CC5 AmPlitude.. NPH! Neutron Porosity RTNR Raw. Thermal Neutron Ratio TNRA Calibrated Thermal Neutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC ES Ta~e Verification Listing ehlumberger Alaska Computing Center 20-DEC-lggO 14:26 PAGEI DEFI G~ Gamma ~av TF, N$ Tension CCb CCL Amplitude NPHI Neutron Porosity RTNR Raw. Thermal Neutron Ratio TNR~ Calibrated Thermal .eutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC G~ Gamma Ray TENS Tension _ CCL CCL Amplitude. NPHI Neutron Porosity DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB *,*. TYPE REPR CODE ,VALUE 0 3 73 168 4 66 5 66 6 73 ? 65 9 65 11 66 6 66 0 14 65 FI I~ 66 68 16 66 ! ~ 0 66 0 ** SET TYPE * CHAN ** N~ME SERV UNIT SERVICE AP1 AP1 APi APl FILE NUMB'NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP<iELEM CODE (HEX) DEPT FT 413560 O0 000 O0 0 i 1 1 4 68 0000000000 NPHI PSI PU 413560 O0 000 O0 0 1 ! 1 4 68 0000000000 RTNR PSi 413560 00 000 00 0 1 1 1 4 68 0000000000. TNR~ PS1 413560 O0 000 O0 '0 I 1 I 4 68 0000000000 RCNT PS1 CPS 413560 O0 000 O0 0 I I 1 4 68 0000000000 Tape Veri~icstion Listinq chl~mberqer ~les~a Co~uti~ Center 20=DEC-1990 i4:26 PAGEI RCF~ PS1 CPS 41356O CNTC PS1 CPS 413560 CFTC PSi CPS 413560 GR PSi GAPI 413560 TENS PS1 h. 413560 CCh PS, ¥ 41356O NP., PS2 PO 413560 RTNR PS2 413560 TNRA PS2 413560 RCNT PS2 CPS 413560 RCFT P$2 CPS 413560 CNTC PS2 CPS 413560 CFTC P82 CPS 413560 GR PS2 GAPI 413560 TENS PS2 LB 413560 CCL PS2 V 413560 NPH! PS3 PU 413560 RTNR PS3 413560 TNRA PS3 413560 ' RCNT PS3 CPS 413560 RCFT P$3 CPS 413560 CNTC P$3 ~p$ 413560 413560 CFTC PS3 bPs G. PS3 GAP, 413.560 TENS P53 LB 413,60 CCL PS3 V 413560 NPH? PS4 PU 4135 60 RTN, P$4 413560 TNRA PS4 413560 RCNT PS4 CPS 413560 RCFT PS4 CPS 41 3560 CNTC P$4 CPS 413560 CFTC P$4 CPS 413560 GR PS4 GAPI 413560 TENS PS4 LB 413560 NA~F SERV UNIT SERVICE API AP1 AP1 APl FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ooooo ooo, , , ~ ~ oooooooooo ooooo ooo, , , ~ ~ oooooooooo ooooo ooo, , , ~ ~ oooooooooo ooooo ooo, , , , ,,oooooooooo ooooo ooo, ~ , . ~,oo ooooooo o ooooo ooo, , , , ~,oooooooooo ooooo ooo, , , , ~,oooooooooo ooooo ooo, , , , ~,oooooooooo ooooo ooo, , , , ~,oooooooooo ooooo ooo, , , , ,,oooooooooo oo ooo ooo, , , , ,,oooooooooo ooooo ooo, ,', , ~,oooooooooo ooooo ooo, , ~ , ~,oooooooooo ooooo ooo{ + . ~ ~ ~~~o ooooo ooo, ~ i , ~,~~vO ooooo ooo~ ~ ~ , 6,oooooooooo ooooo ooo~ , ~ , ,,oooooooooo ooooo ooo~ , ~ , 6,oooooooooo ooooo ooo~ ~ , , ~,oooooooooo ooooo ooo~ , , , ooooo ooo, , , ~ ~ 68 0000000000 · 0000000000 oo ooo ooo , , . , ~, oooooooooo oo ooo ooo , , , ~ ~ oooooooooo cc~ ,54 ~ ~)~ oo ooo oo o ~ ' ' ~ ~ o~ooooooooo 000000000 · 560 00 000 00 0 DATA DEPT RCNT G~ RTNR CNTC CCI, RCNT GR RTNR 10279 PSi -999 PS1 -999 PS2 -999 P$2 -999 PS2 -999 PS3 -999 PS3 -999 PS4 -999 500 NPHI,PSl -999 250 RCFT,PSi -999 250 TENS.;PSI -999 250 TNRA'PS2 -999 ~0 CFTC,PS2 -999 0 NPHi.PS3 -999 250 RCFT,PS3 -999 250 TENS,PS3 -999 250 TNRA.PS4 -999 250 250 250 250 2'50 250 250 RTNR PSi CNTC PS1 CCh PSi RCNT PS2 GR P$2 RTNR PS3 CNTC PS3 CCL,PS3 RCNT,PS4 ~999 .999 -999 -999. ,999: -999 -999 -999 -999 ,250 TNRA ,.250 CFTC 250 NPHi 250 RCFT 250 TENS 250 TNRA 250 CFTC 250 NPHI 250 RCFT ,Psi PS PS PS ,PS2 'g99, -999 -999 .-999 -999 -999 -999 -999 -999 250 250 ~$0 '3O IS Tape verification bisting .chlumberqer AlasKa Computing Center CNTC.P$4 -999,250 CC[,,PS4 -999,250 DEPT RCN? PSt GR PSi RTNP PS2 CNTC PS2 CCL PS2 RC~T PS3 G~ PS3 RTN~ CNTC PS4 CCL PS4 DEPT, RCNT.PS1 GR RTN~ P$2 CNTC PS2 COL PS2 RCNT PS3 GR PS3 RTN~ P84 C~T¢ PS4 CCL P84 DEPT, RCNTePS1 GR.PS~ RTNR,P82 CNTC,PS2 CC5.PS2 RCNT;PS3 G~,PS3 RTNR~PS4 , CNTC,P84 CCt,;PS4 DEPT ~CNT CNTC PS2 CCL PS2 ~CNT GR PS3 RT~ PS4 CNTC PS4 CCL PS4 DFPT RCNT!PS1 RTNR PS2 10200 000 4253 578 13 773 3 534 4450 417 0 O00 4306 483 18 172 3 649 4582 714 0,000 395i 277 0 000 4 9 0 000 10000,000 3860,94'0 4099 075 0 000 4 357 3955 244 '2 701 9900 000 3722 449 43 500 3 288 3896 855 0 000 3992 42 375 3 545 3751 992 0 000 9800,000 8112,225 42,406 1.764 CFTC.PS4 NPHI.HLA NPHI.PS1 RCFT,PSI TENS,PS1 TNRA.P$2 CFTC,PS2 NPHI,P$3 RCFT,PS3 TENS.PS3 TNRA,PS4 CFTC,PS4 NPHI.HLA NPHI. PSi RCFT TENS PS1 TNRA P$2 CFTCPSps~ NPHI RCFT PS3 TENS PS3 TNRAPS4 CFTC PS4 NPHI MbA NPH I, PS i RCFT.,PS[ TENS PS'I TNRA~ PS2 CFTC PS2 NPHI P$3 RCFT PS 3 TENS PS 3 TNRA PS4 CFTC P$4 NPHI HLA NPHi~PSI RCFT,PS TENS PS TNRA P8~ CFTC PS 2 NPHI PS3 RCFT P$3. TENS PS3 TNRA PS4 CFTC PS4 NPHI ~5A RC'FT.PS1 TENS.PSi TNRA.PS2 20-DEC-1990 14:26 '999.250 GR,PS4 0,000 20 559 1200 000 2284 000 3 765 ll~ 887 865 I 000 o g54 28 125 883 436. 943 0~6 2.310 000 8444 657 899 27 295 .24,787 2~66,667 40,000 4 458 2324 0 0 4 2 451 O98 19 78 tt38 228~ 000 ?07 ~066 $89 O27 1152 000 2260 000 99~ 992 543 19 873 6,~87 O4 22 1,870 RTNR.PS1 CNTC,PS! CCh,PS[ RCNT,PS2 GR,PS2 RTMR~PS3 CNTC.PS3 CCL.PS3 RC~T,PS4 ~R.PS4 CN~ PSi C( PSi ECl P$2 RTl PS2 PS3 CN PS3 C PS3 RC PS4 PS4 RTt PS C] PSI Ri PS2 PS2 RTNR~ PS 3 CN~;C' PS3 CCh,PS3 · * P84 RTe',PS1 CN~ ,PS~ CC' PS2 RCN~ PSi GR PS2 R?NR P83 CNTC PS3 cch PS3 RCN~ PS4 GR PS4 RTNR,p$1 CNTC' PS 1 CC5, PS 1 RCNT, PS2 -999.250 TENS.PS4 3 556 TNRA,PS1 4469 084 CFTC.PSi 0 4277 18 3 4476 O. 4473. 22 000 NPHX.P$2 551 RCFT.P$2 922 TENS,PS2 680 TNRA,PS3 399 CF?C,PS3 000 NP~I,PS4 -469 RCFTePS4 063 TENS'PS4 4 630 TNRA.,PS1 3830 549 CFTC,PS1 PS 0, 000 NPH!'pS22 3719 438 RCFT. 3624 16 TNRA,PS. 00 CFTC, NPH~, 90 RCFT,P$4 69 TENS,PS4 4 4024 0 1¢ 4015. , 0 3820, 17 CFTC PSl 000 NP~I. · 000 RCFT 984 TENS 200 TNRA 805 CFTC 000 NPM! 408 RCFT 063 TENS PS2 PS 0 3783 41 3 3949 0 3795 46 2~8 CFTC.PS! ooo ,567 RCFT,P PS 844 TENS bs~ 306 TNRA~ 386 CFTC PS3 000 NPH! P84 501 RCFT PS4 :656 TENS PS4 828 '000 7887 "775 TNRA.PS1 CFTC.PS NPHX,,PS RCFT,P82 PAGEI 7 '999,250 82 3"981 1137. 2290.000 ~.;e69 1142,977 1210,634 2384,000 855 2350 4 599 86 959 2354 000 4,~90' 919~9i4 25,,307 945,892 2334,'000 4.3~9 934,.S53 25,964 23 ~, O0 1168, 2244:.000 1077,55 2284,00~ IS Ta~e Verification Listing chlumberqer Alaska Computing Center CNTC PS2 8171.712 CFTC.PS2 CCL:PS2 0.000 NPHI,P$3 RCNT,PS3 7951,903 RCFT,PS3 G~,PS3 44,625 TENS,PS3 RTNR,PS4 t 708 TNRA,PS4 CNTC,P$4 8361:i95 CFTC,PS4 CCL.PS4 O.000 NPHI'HLA DEPT RCNT CNTC CCL RCNT RTNR CNTC CCL PS2 PS2 P$4 PS4 PS4 9735 500 -999 -999250 -999 250 -999 250 -999 0 -999 0 -999 250 -999 250 NPHI.PSI RCFT.PS1 TENS.PS! TNRA,PS2 CFTC,PS2 NPHI,PS3 RCFT,PS3 TENS, PS3 TNRA,PS4 CFTC,PS4 NPHI,HbA END OF DATA 20-DEC-1990 14=26 4112,600 6 104 4479 371 2244 000 ! 844 4390 650 6 152 -999,250 -999,250 -999,250 -999,250 -999o250 -999;.50 -999.~50 -999 250 -999 250 250 -.99~ 000 GR.P$2 'RTNR,PS3 CNTC,PS3 COb,PS3 RCNT,PS4 GA,PS4 RTNR.P$1 CNTC,PS! CCL,P81 RCNT,PS2 GA,PS2 RT'NR,P83 CNTC.P$3 ,P84 GA,P84 46.313 TENS.PS2 ! 705 TNRA.,P83 8255:592 CFTC'PS3 0.000 NPHI P$4 8195.918 RCrT!PS4 40,281 TENS P$4 -999.250 -999 -999: -999 -999 -999: ~999, "999 -999 -999 NPNI,P$2 250 RCrT.,P$2 250 TENS,PS2 , 50 TNRR,P83 ~50 CFTC,PS3 250 NPHI,PS4 250 RCFT,PS4 250 TENS,PS4 PAGE." 2250,000 2274,000 ., -999 -999 150 -999 150 '-999 -999 -9 250 -999 250 **** FILE TRAILER FILE NAME = EDIT .O01 SERVICE = FLIC VERSION : 001A06 DATE , 90~2/20 MaX PEC SIZE ." 10 ' FILE TYPE : LO LAST FILE **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 90/t2/20 ORIGIN = FLIC ~PE NAME , 74249 NTINUATION # I 1 PREVIOUS TAPE = COMMENT = BP ExpLORATION,PRUDHOE BAY,P-i9,50-029-22094~O0 **** REEL TRAILER **** SERVICE NAME = EDIT DATE : 90/12/20 ORIGIN = rbIC REEI, NA~E . = 74249 CONTINUATION # ~ PREVIOUS REEL = CO~ENT ~ BP EXPLORATION,PRUDHOE BAY,P-lg,50-029-22094-O0