HomeMy WebLinkAbout190-136 • •
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com>
Sent: Sunday, September 20, 2015 5:54 PM
To: AK, OPS GC1 OSM;AK, OPS GC1 Field O&M TL; AK, OPS GC1 Facility OTL;AK, OPS GC1
Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well
Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK,
RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad YP;
Odom, Kristine; Wallace, Chris D (DOA)
Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C
Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R;
Morrison, Spencer; Regg, James B (DOA)
Subject: OPERABLE: Producer P-19 (PTD#1901360) TIFL Passed Post Valve Change Out
Attachments: Producer P-19 (PTD #1901360) TIO Plot.docx
All,
Producer P-19 (PTD#1901360) passed TIFL on September 20, 2015 following gas lift valve work. This passing test
confirms two competent barriers in the wellbore. The well is reclassified as Operable.
• Well status is Operable
• A SSSV is not required
A copy of the TIO plot is included for reference.
Thank you,
Kevin Parks
(Alternate: Whitney Pert
BP Alaska-Well Integrity Coordinator
GWGlobal Wells
Organization SCA*" JUN 0 12016
Office: 907.659.5102
WIC Email:AKDCWeIlIntegrityCoordinator@bp.com
From: AK, D&C Well Integrity Coordinator
Sent: Thursday, September 10, 2015 7:36 AM
To: AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod
Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline
Operations Superintendent; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad YP;
Odom, Kristine; 'chris.wallace@alaska.gov'
Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer;
AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Regg, James B (DOA) (jim.reqg@alaska.gov);
Pettus, Whitney
Subject: UNDER EVALUATION: Producer P-19 (PTD #1901360) Sustained Inner Annulus Casing Pressure over MOASP
All,
Producer P-19 (PTD#1901360) was reported to have sustained inner annulus casing above MOASP on September 7th,
2015. The pressures were confirmed to be TBG/IA/OA= 2050/2050/0 psi. A warm TIFL subsequently failed on
1
• •
•
September 9th, 2015 indicating a lack of potential downhole barriers. At this time,the well has been reclassified as
Under Evaluation for further diagnostics.
Plan Forward:
1. Downhole Diagnostics:TIFL—FAILED 09/09/15
2. Slickline: Change out orifice gas lift valve
3. Well Integrity Engineer: Additional diagnostics as needed
Please call with any questions or concerns.
Thank you,
Whitney Pettus
(Alternate: Kevin Parks)
BP Alaska-Well Integrity Coordinator
GW
WIC Office: 907.659.5102
WIC Email: AKDCWellIntegrityCoordinator@BP.com
2
•
•
Producer P-19(PTD#1901360)TIO Plot
a OM
ten.
m
)1111r _AMA
04.1.15 Xi't! m.»5 Na'n a715. mmn at..IS 18,15
•
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com>
Sent: Thursday, September 10, 2015 7:36 AM
To: AK, OPS GC1 OSM;AK, OPS GC1 Field O&M TL; AK, OPS GC1 Facility OTL;AK, OPS GC1
Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well
Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK,
RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad VP;
Odom, Kristine; Wallace, Chris D (DOA)
Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer; AK, D&C
Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R;
Morrison, Spencer; Regg, James B (DOA); Pettus, Whitney
Subject: UNDER EVALUATION: Producer P-19 (PTD#1901360) Sustained Inner Annulus Casing
Pressure over MOASP
All,
Producer P-19 (PTD#1901360) was reported to have sustained inner annulus casing above MOASP on September 7th,
2015. The pressures were confirmed to be TBG/IA/OA= 2050/2050/0 psi. A warm TIFL subsequently failed on
September 9th, 2015 indicating a lack of potential downhole barriers. At this time, the well has been reclassified as
Under Evaluation for further diagnostics.
Plan Forward:
1. Downhole Diagnostics:TIFL—FAILED 09/09/15
2. Slickline: Change out orifice gas lift valve
3. Well Integrity Engineer: Additional diagnostics as needed
Please call with any questions or concerns.
Thank you,
Whitney Pettus
(Alternate:Kevin Parks) SCANNED MAR 0 8 2016
BP Alaska-Well Integrity Coordinator
G
WIC Office: 907.659.5102
WIC Email: AKDCWeIlIntegrityCoordinator@BP.com
1
&eau f +ct
• • ( i
Regg, James B (DOA)
From: AK, D &C Well Integrity Coordinator [ AKDCWellIntegrityCoordinator @bp.com] Qec °5/2-1c 5
Sent: Thursday, May 02, 2013 10:37 AM
To: AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1
Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Well
Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, RES GPB
West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad YP; Charles,
Marcus A; Weiss, Troy D; Regg, James B (DOA); Schwartz, Guy L (DOA)
Cc: AK, D &C DHD Well Integrity Engineer; AK, D &C Well Integrity Coordinator; Holt, Ryan P
Subject: OPERABLE: Producer P -19 (PTD # 1901360) Passing TIFL
All,
Producer P -19 (PTD #1901360) passed a TIFL on 05/01/2013 after being brought back online from a pad shutdown. The
passing TIFL confirms two competent barriers in the welibore. The well is reclassified as Operable.
Please call with any questions.
Thank you,
Jack Disbrow
:: , su mo JUL 0 8 `1.013
BP Alaska - Well Integrity Coordinator
Glob& Wells
Drganizatior
Office: 907.659.5102
WIC Email: AKDCWeIIIntegrityCoordinator bp.com
From: AK, D &C Well Integrity Coordinator
Sent: Monday, April 22, 2013 11:36 PM
To: AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpa• Lead; AK, OPS Prod
Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Well Services Operations Team Lead; AK, %: C Wireline Operations
Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS -II Pad YP; Charles, Marcus
A; Weiss, Troy D; 'jim.regg @alaska.gov'; 'Schwartz, Guy L (DOA)'
Cc: AK, D &C DHD Well Integrity Engineer; Climer, Laurie A; Clingingsmith, Mike J
Subject: Under Eval: Producer P -19 (PTD # 1901360) Sustained Inner Annulus C. ng Pressure Above MOASP
All,
Producer P -19 (PTD# 1901360) broke MOASP during a pad shut in. At th': time, the well is able to be brought back online
for further diagnostics. The well has been reclassified as Under Eval ion.
Plan Forward:
1. Bleed IA as necessary
2. DHD to perform TIFL
Regards,
/
Laurie Climer
(1 itern iie•:.Icrr•k L3i.Nhrour) r'
BP Alaska - Well Integrity Coordirrator
Gkp ,o: W?'` i:i
£fir aro aI!on
1
• • P -1
Pr no( 3,(:)
Regg, James B (DOA)
From: AK, D &C Well Integrity Coordinator [AKDCWeIIIntegrityCoordinator @bp.com]
Sent: Saturday, April 13, 2013 10:39 AM
To: Regg, James B (DOA); Schwartz, Guy L (DOA)
Subject: NOT OPERABLE: Producer P -19 (PTD # 1901360) Sustained Inner Annulus Casing
Pressure Above MOASP
Attachments: Producer P -19 (PTD #1901360) TIO Plot.docx
Jim, Guy
Please note that P -16 is not over MOASP as stated below. P -19 has sustained inner annulus pressure above MOASP.
Please disregard the original email and reference the correct email as follows:
All,
Producer P -19 (PTD #1901360) was found to have sustained inner annulus pressure above MOASP due to P -pad having
been shut in for critical construction in the area. The well is reclassified as Not Operable until the pad is brought back
online and a TIFL can be performed to verify tubing integrity.
Plan forward:
1. DHD: Perform warm TIFL once P -pad is back online
A copy of the TIO plot is included for reference.
Please call with any questions.
SCANNED J , �L U 8 2013
Thank you,
Jack Disbrow
BP Alaska - Well Integrity Coordinator
GVV Global Wells
f rganizatior!
Office: 907.659.5102
WIC Email: AKDCWeIllntegrityCoordinator Pbp.com
From: AK, D &C Well Integrity Coordinator
Sent: Saturday, April 13, 2013 9:46 AM
To: AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod
Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations
Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad YP; Charles, Marcus
A; 'jim.regg @alaska.gov'; 'Schwartz, Guy L (DOA)'; Weiss, Troy D
Cc: AK, D &C DHD Well Integrity Engineer; AK, D &C Well Integrity Coordinator; Holt, Ryan P; Walker, Greg (D &C)
Subject: NOT OPERABLE: Producer P -16 (PTD # 1901630) Sustained Inner Annulus Casing Pressure Above MOASP
All,
Producer P -16 (PTD #1901630) was found to have sustained inner annulus pressure above MOASP due to P -pad having
been shut in for critical construction in the area. The well is reclassified as Not Operable until the pad is brought back
online and a TIFL can be performed to verify tubing integrity.
Plan forward:
1. DHD: Perform warm TIFL once P -pad is back online
A copy of the TIO plot is included for reference.
1
•
Please call with any questions.
Thank you,
Jack Disbrow
BP Alaska - Well Integrity Coordinator
G �9 Global Wells
�! �! Organization
Office: 907.659.5102
WIC Email: AKDCWeIIIntegrityCoordinator Pbp.com
2
PBU P-19
PTD #1901360
4/13/2013
TIO Pressures Plot
Well: P-19
•
3.000
Tbg
—II— LA
2,000
00A
—40— 000A
On
1. CO0
Mar
•
01119113 01/261 3 02102113 02 02/16113 02/23/13 03/02/13 03109/13 03/16/13 03123/13 03/30/13 04.061 3 041 313
• •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
August 22, 2011 r ?..UL RECEIVED'
AUG 3 1 NV
Mr. Tom Maunder Ci�CeN�'jsE�011
Alaska Oil and Gas Conservation Commission mm Q 1
333 West 7 Avenue CMS
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPB P -Pad q o 36
Dear Mr. Maunder,
'— I
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB P-
Pad that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
P -Pad
Date: 07/21/11
Corrosion
Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft na gal
P -01 1920920 500292228700 0.30 NA 0.30 NA 0.85 4/24/2010
P -02A 2000840 500292237601 0.30 NA 0.30 NA 4.25 4/25/2010
P -03A 1972280 500292217601 12.70 5.0 0.30 7/12/2010 2.55 8/5/2010
P -04 1910760 500292218000 1.80 NA 1.80 NA 15.30 4/25/2010
P -05A 2000510 500292254501 0.80 NA 0.80 NA 5.95 4/25/2010
P -06B 2051380 500292216602 11.30 3.0 1.00 7/12/2010 9.35 8/5/2010
P -07A 2011960 500292253501 0.50 NA 0.50 NA 1.70 4/24/2010
P -08A 2000850 500292237701 0.10 NA 0.10 NA 0.85 4/24/2010
P -09 1930580 500292236200 0.10 NA 0.10 NA 0.85 4/24/2010
P -10 1910520 500292215800 3.00 NA 3.00 NA 28.05 4/24/2010
P -11 1910290 500292214300 3.00 NA 3.00 NA 23.80 4/23/2010
P -128 2001330 500292213602 0.30 NA 0.30 NA 0.85 4/23/2010
P -13 1901110 500292208000 0.30 NA 0.30 NA 1.70 4/23/2010
P -14 1910070 500292212900 7.50 NA 7.50 NA 56.10 7/21/2011
P -16 1901630 500292211300 4.30 NA 4.30 NA 37.40 4/22/2010
P -17 1901550 500292210500 8.00 NA 8.00 NA 89.30 4/28/2010
P -19 1901360 500292209400 0.80 NA 0.80 NA 5.10 4/21/2010
P -20B 2001590 500292208902 0.20 NA 0.20 NA 0.85 4/21/2010
P-21B 1970640 500292214802 0.40 NA 0.40 NA 4.30 4/21/2010
P -22 1931210 500292239600 0.30 NA 0.30 NA 1.70 4/23/2010
P -23 1931120 500292239300 0.30 NA 0.30 NA 0.85 4/24/2010
P -24 1970540 500292275500 1.80 NA 1.80 NA 8.50 4/24/2010
P -25 1970260 500292274200 64.00 24.0 2.60 7/17/2011 23.80 7/20/2011
P -26 1962000 500292272700 2.60 NA 2.60 NA 22.10 4/25/2010
P -27 2040500 500292320300 1.00 NA 1.00 NA 6.80 4/25/2010
P -28 2100480 500292342500 1.20 NA 1.20 NA 10.20 8/7/2010
OR BEFORE
c:~O~n°c
STATE OF ALASKA
ALAS OIL AND GAS CONSERVATION COMMISSIC
REPORT OF SUNDRY WELL OPEHATIONS
1. Operations performed: Operation shutdown Stimulate X Plugging
Pull tubing Alter casing Repair well
Perforate
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2960' SNL, 2950' WEL, SEC. 31, T11N, R13E
At top of productive interval
276' SNL, 1302' WEL, SEC. 6, TION, R13E
At effective depth
482' SNL, 1266' WEL, SEC. 6, TION, R13E
At total depth
564' SNL, 1247' WEL, SEC. 6, TION, R13E
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
ORIGINAL
6. Datum elevation (DF or KB)
91.90 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
P-19 (41-06-10-13)
9. Permit number/approval number
90-136 /
10. APl number
50- 029-22094
11. Field/Pool
Prudhoe 0il Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural --
Conductor 110
Surface 2654
Intermediate 9732
Production --
Liner 829
Perforation depth: measured
10360' feet Plugs (measured)
9271 feet
10236' feet Junk (measured)
9180' feet
Size Cemented
Measured depth
146
2680
9768'
20
10-3/ 3720 c.f
7-5/8" 1392 c.f
5,1/2" 182 c. f 9531 - 10360
9980'- 10020', 10032-10075', 9942'- 9952',9962'- 9990
True vertical depth
BKB
146
2588
7381
7236- 7733
true vertical subsea
7485-8969 (four intervals)
Tubing (size, grade, and measured depth) 4-1/2" 12.6#1-80 @9534
Packers and SSSV (type and measured depth) TlWpacker @ 9440'
SSSV @ 2090'
RECEIVED
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
JUN I 5 i994
aisska Oil & Oas Cons. Commissior.
Anchorage
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
400 389 210 1137
450 147 334 1276
Tubing Pressure
232
233
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended. ,
Service
17. I hereby (~ertify that the foregoing is true and correct to the best of my knowledge.
S~gned' ~~ (._ / ~ ,d~ Title Senior Technbal Assistant I
Form 10-404} Rev 06/15/88
Date ~,//$/~
SUBMIT IN DLfPLI6ATE~
?,
2/12/93
WELL P-19(41-06-10-13)
Stimulation Operation
A HCL Acid Wash Treatment was performed using the
following fluids:
9/30/93
fjh
6/13/94
SUMMARY
LIQUID PACKED WELL WITH 100 BBLS SW. WASHED PERFS WITH 46
BBLS 15% HCL/10% XYLENE. RETURN WELL TO PRODUCTION AND
BEGIN FLOWBACK SAMPLING.
BBLS.
140
46
30
FLUIDS PUMPED
3 MICRON FILTERED 140 F SEA WATER
15% HCL / 10 % XYLENE W/1% ACI-274, 0.4% NE41, 0.7% S-
500, 0.2% Inflo45, 24 ppt Ferrotrol -210
METHANOL
A 5% HCL Acid Wash Treatment was performed using the
following fluids:
JOB SUMMARY
RIH WHILE PUMPING SW, TAGGED TD AT 10097,S/L CORRECTED TD
WAS 100075. DID NOT MAKE ANY COIL DEPTH CORRECTION, FELT
COIL JUST RUNNING THROUGH CL. PRESSURE TESTED BJ AND
PUMPED 254 BBLS OF 5% HCL WHILE RECIPROCATING NOZZLE
ACROSS PERFS. SAW NO PRESSURE RESPONSE THROUGHOUT THE
FIRST 180 BBLS. PRESSURE SLOWLY ROSE AT THAT POINT.
DISPLACED ACID OUT OF THE CT WITH 23 BBLS SW AND CONTINUED
TO PUMP AN ADDITIONAL 55 BBL SW WHILE POOH TO ENSURE ALL
ACID BEHIND PIPE. POOH AND F/P WITH 24 BBL METH. RETURNED
WELL TO PRODUCTION WITH INSTRUCTIONS TO BRING ON PER
PROGRAM.
FLUID SUMMARY
94 BBL SW FILTERED TO 3 MICRON
254 BBL HCL
78 BBL SW
24 BBL METHANOL
ADDITIVES
5% HCL
4 GPT NE-41
2 GPT-MS-10
25 PPT FERROTROL 210
4 GPT ACI-274
RECEIVE
0ii & Oas Cons. Cornmissior
Anchorage
...... STATE OF ALASKA
AL ~A OIL AND GAS CONSERVATION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate X Plugging
Pull tubing Alter casing Repair well
Perforate
Other.
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2960' SNL, 2950' WEL, SEC. 31, T11N, R13E
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
91.90 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
P-19 (41-06-10-13)
At top of productive interval
276'SNL, 1302' WEL, SEC. 6, TION, R13E
At effective depth
482' SNL, 1266' WEL, SEC. 6, TION, R13E
At total depth
564' SNL, 1247' WEL, SEC. 6, TION, R13E
9. Permit number/approval number
90-136/N/A
10. APl number
50- 029-22094
11. Field/Pool
Prudhoe Off Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural --
Conductor 110
Surface 2654
Intermediate 9732
Production --
Liner 829
Perforation depth: measured
10360'feet Plugs (measured)
9271feet
10236'feet Junk (measured)
9180feet
Size Cemented Measured depth
2O 146
10-3/4" 3720 c.f 2680
7-5/8" 1392 c.f 9768'
5-1/2" 182 c.f 9531-10360
9980'- 10020', 10032-10075', 9942'- 9952',9962'- 9990
True vertical depth
BKB
146
2588
7381
7236-7733
true vertical subsea
Tubing (size, grade, and measured depth) 4-1/2" 12.6//1-80 @9534
Packers and SSSV (type and measured depth) TlWpacker@ 9440'
SSSV @ 2090'
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure
640 471 28 667
3040 ~ 2636 84 1091
Tubing Pressure
22O
251
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Form 10-404 Rev 06/15/8
SUBMIT IN DUPLICATE
WELL 'P-19 (41-.06-10.13)
ADDED PERF/FRAC
The following interval was reperforated on 4/20/91 using 3 3/8 gun
diameter with 6 shot density, random orientation and 60 phasing.
9918' 9950'
Performed hydraulic fracture on 5/3-4/91.
Pumped 97,000 4/. of 16/20 CL and left 3,000 4/ in the Liner. After
the frac the ISIP was 3000 PSI.
4/02/92
fjh
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSi,_.,
REPORT OF SUNDRY WELL
1. Operations performed: Operation shutdown Stimulate . Plugging
Puli tubing Alter casing Repair well .
Perforate X
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2960' SNL, 2950' WEL, SEC. 31, T11N, R13E
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
91.90 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
P-19 (41~06-10-13)
At top of productive interval
276' SNL, 1302' WEL, SEC. 6, TION, R13E
At effective depth
482' SNL, 1266' WEL, SEC. 6, TION, R13E
At total depth
564' SNL, 1247' WEL, SEC. 6, TION, R13E
12. Present well condition summary
Total depth: measured
true vertical
103601eet Plugs (measured)
9271feet
9. Permit number/approval number
90-136/N/A
10. APl number
50- 029-22094
11, Field/Pool
Prudhoe Oil Pool
Effective depth: measured 10236~[eet Junk (measured)
true vertical 91801eet
Casing Length Size Cemented
Structural --
Conductor 110 20
Surface 2654 10-3/4" 3720 c.f
Intermediate 9732 7-5/8" 1392 c.f
Production --
Liner 829 5-1/2" 182 c.f
Perforation depth: measured 9980'- 10020', 10032-10075', 9942'- 9952',9962'- 9990
Measured depth
146
268O
9768'
9531-10360
true vertical subsea
7485-8969 (four intervals)
Tubing (size. grade, and measured depth) 4-1/2" 12.6~ 1-80 @9534
Packers and SSSV (type and measured depth) TIWpacker@ 9440'
SSS V @ 2090'
True vertical depth
BKB
146
2588
7381
7236-7733
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure Added perfs 9942'-9952', and 9962-9990' on February 11, 1990
3.375gun, 41B HJ2, HPD, 4 spf.
14.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
Subsequent to operation
1'5. Attachments
Copies of Logs and Surveys run.
Daily Report of Well Operations
780 409 39 620 205
840 ~'~' 469 33 657 209
16. Status of wellclassification as:
Oil X Gas Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Si~lned /. ~- · ~,~,.) ~/,~4,~./'~ Title Supervisor waterflood & Miscible flood
Form 10-404 Rev 0~,~15/j~8
Date
SUBMIT IN DUPLI(~ATE
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :05/14/91
T#:82386
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
D-23
E-19
M-21
-'P-17
U-11
W-25
· ~ X-07
7-20
Gas Entry Survey 04/24/91 #1 10100-10480 Camco 5"
Gas Entry/Prod-F 04/19/91 # 1 11450-11690 Camco 5"
Gamma -Ray 04/16/91 # 1 8300-9005.5 Camco 5"
Prod-F 04/17/91 #1 12100-12445 Camco 5"
GR/CCL/Pre Frac 04/19/91 #1 8700-9178 Camco ~ 5"
Gamma-Ray 04/24/91 #1 9300-9954 Camco 5'
PITS 04/23/91 #1 1.0400-11190 Camco 5"
Leak Det. 04/26/91 #1 9500-9750 Camco 5"
Prod-F 04/18/91 #1 10100-10553 Camco 5"
Jewelry 04/23/91 #1 9900-11000 Camco. 5"
Temp 04/27/91 #1 3000-13132 Camco 5"
Gas Entry Survey 04/17/91 #1 11100-11521 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
MAY 2 0 1991
Alaska 011 & Oas Cons. Commission
~ch0rage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage. Alaska 99519.6612
(907) 561-5111
TO: DISTRIBUTION Date :04/25/91
T#:82371
FROM'
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the matedal listed below. If you have any questions, Please contact BP
Well Records at (907) 564-4445.
-22
''
2
P-19
Completion 04/21/91 #1 9540-10340 Sch 5"
CET 04/21/91 #1 9087-9820 Sch 5"
CBT 04/21/91 #1 9087-9797 Sch 5"
CET 04/22/91 #1 8900-9647 Sch 5"
CBT 04/22/91 #1 8900-9623 Sch 5"
Completion 04/20/91 #1 9740-10184 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Pull tubing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2960' SNL, 2950' WEL, SEC. 31, T11N, R13E
At top of productive interval
276' SNL, 1302' WEL, SEC. 6, TION, R13E
At effective depth
482' SNL, 1266' WEL, SEC. 6, TION, R13E
At total depth
564' SNL, 1247' WEL, SEC. 6, TION, R13E
12. Present well condition summary
Total depth: measured
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Stimulate Plugging
Alter casing Repair well
5, Type of Well:
Development X
Exploratory
S~'atlgraphlc
Service
10360'feet Plugs (measured)
true vertical 9271feet
measured 10236'feet Junk (measured)
true vertical 91801eet
Length Size Cemented
110 20
2654 10-3/4" 3720 c.f
9732 7-5/8" 1392 c.f
measured
829 5-1/2" 182 c.f
Perforate ×
Other
6. Datum elevation (DF or KB)
91.90 AMSL feet
7, Unit or Property name
Prudhoe Bay Unit
8, Well number
P-19 (41-06-10-13)
9. Permit number/approval number
9O- 136/N/A
10. APl number
50- 029-22094
11. Field/Pool
Prudhoe Oil Pool
Measured depth True vertical depth
BKB
146 146
2680 2588
9768' 7381
9531-10360 7236- 7733
9980'- 10020', 10032-10075', 9942'- 9952',9962'- 9990
true vertical subsea
7485-8969 (four intervals)
Tubing (size, grade, and measured depth) 4-1/2" 12.6~ 1-80 @9534
Packers and SSSV (type and measured depth) TlWpacker@ 9440'
SSS V @ 2090'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Re_oresentative Daily Averaoe Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
780 409 39 620 205
840 469 33 657 209
Prior to well operation
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run.
Daily Report of Well Operations ...
16. Status of well classification as:
Oil × Gas Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
.Form 10-404 Rev 06/15/88 ~
Date
SUBMIT IN DUPLICATE
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
OR IG IN A
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
;1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] _
2. Name of Operator 7. Permit Number
BP Exploration 90-136
3. Address 8. APl Number
P. O. Box 196612, Anchorage, A/aska 99519-6612 5o- 029-22094
4. Location of well at surface 9. Unit 0r Lease Name
2960' SNL, 2950' WEL, SEC. 31, T11N, R13E.~: ,'_:i~;,.'.,i:~i.~ ~'~,~?~ ~ '= ....... ~= = '''~ Prudhoe Bay Unit
At Top Producing Interval ! ''r.', ..--*~ :t :~'--- '-' -- 10. Well Number
276'SNL, 1302'WEL, SEC. 6, T10N, R13E
P-19.(.4.1-06-10-13)
At Total Depth ,/~ ;~ i :¢u~.~,,ll Prudhoe Bay Field/Prudhoe Bay Pool
564' SNL, 1247' WEL, SEC. 6 TION, R13E
5~' EleVation in feet (i'ndicate KB, DF, etc.) [6. Lease Designation and Sedal No.
91.9' KBE I ADL 28289
12. Date Spudded 13. Bate T.D. Reached 14. Date Comp., Susp. or Ab~nd. 115. Water Depth, it ollshore J16. No. of Completions
10-09-90 10-22-90 12-29-90I N/A feet MSL I One
17. Total Depth (MD+TVB) 18. Plug Back Depth (MD+TVD)19. Directional 'Survey 120. Depth where SS~V set 121. Thickness of Permatrost
10360' MD/g271' TVD 10236' MD/9180' TVD YES [] NO [] .J . 2090feet MD I 19.85'
2'~. 'Type Eleciri(~ or Other Logs Run ' '
DI .~. MSFL/GR/SP/BHC, LO T/CNL/HFFGR
· .
23. CASING, LINER AND CEMENTING RECORD
.,
SETflNG DEPTH MD
CASING SIZE WT. PER FT. GPA. DE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" Cond. Surface 110'
10-3/4" 45.5# L-80 Surface 2680' 13-1/2" 3720 cuft Permafrost
.....
7-5/8" 29. 7# NT95HS Surface 9768' 9-7/8" 1392 cufl Class G
5-1/2" 17# NTsOS' ' 9531' 10360' 6-3/4" 182 cufl Class 'G
,
.... ,
24. 'Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD "
interval, size and number) SIZE DEPTH SET (MDI PACKER SET (MD/
Schlumberger 3-3/8" @ 4 spf 4-1/2" 12.6# 9534' 9440'
MD TVDSS L-80
9980'- 10020' 8896'- 8927' 2~. ACID, FRACTURE, CEMENT SQUEF'2;E, ETC.
10032' - 10075' 8936'- 8969' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL LLS~D
10-3~4" X 7-5/8" Do~vnsqueezed annulus with ' ' '
annulus 150 bbls Dry Crude
,,
,,
27. PRODUCTION TEST
Date First Production IMethod ol Operation (Flowing, gas lilt, etC.)
f2-30-90 IF/owing.
Date of 'Test Hours Tested PRODUCTION FOR OlL-BBL GAS-MCF ¢VATER-BBL CHOKE SIZE IGAS-OIL'RATIO
TEST PERIOD ~
Flow Tubing Casing Pressure CALCULATED :DIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DAT,~'
Brief description of ,ithology, porosity, fractures, apparent dips, and presenc_~ of oil,
.
MAR - ~ 199~
. .
Form 10-407
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
Submit in duplicate
. ..
GEOLOGIC MARKERS FOmrv~TION TESTS
=,
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
,, ,
Shublik A 9791' 8840'
,
Zone 4 9916' 8938'
31. LIsT OF A'I-i'ACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signe , Title PBU Lead Engineer Date
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: ,P, RUDHOE BAY UNIT
As of 0600 Hrs. Thursday, October 1 !, 1990
WELL: F-38 (34-03-11-13~ AP! No.
50-029-22093
Day: 2
Depth at 0600 Hrs. =
24 Hour Footage =
1,233 Ft.
733 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost:
Nab0r$ Rig #22-E
125305
Current Operation: Tripping for BHA change
Sumrna~ry of Last 24. Hours:
Drilled 17-1/2" hole to 1233'
Mud Ty[~e Mud Weight Viscositv
SpUd Mud 9.2 #/gal 218 Sec.
? V yP. Fluid Loss Solids Tem0
1 5 6 5 cc °F
Survev .~ Angle
N-S E-W Dog Leg
TVD Section Coordinate Coordinate °!100'
Alaska Oil & Gas Cons,
Anchorage
Reviewed By: MJS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Wednesday. October 10. 1990
WELL: F-35 (34-03-11-1~) APl No.
50-029-22093
Day: 1
Depth at 0600 Hrs. =
24 Flour Footage =
500 Ft.
390 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabor$ Rig #22-E
125305
Current Operation' Surveying.
Summary_ of Last 24 Hours:
Drilled the 17-1/2" hole to 500'.
Mud Type
Mud Weiaht
--
#/gal
Viscosity
Sec.
PV yp, Fluid Loss ~ Temp
oF
CC -
Survey Depth
Anale
--
Direction
.TVD
N-S E-W Dog Leg
Section Coordinate. Coordinate °/100'
Reviewed By: ~'
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRIdDHOE BAY UNIT
As of 0600 Hrs. Friday. October 12. 1990
WELL: F-38 (34-0:3-11-1~)~ AP! No.
50-029-22093
Day: 3
Depth at 0600 Hrs. =
24 Hour Footage =
2.500 Ft.
1,267 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabor$ Rig #22-E
Current Operation' Running 13-3/8" casing.
Summary of Last 24 Hours'
Drill to 2500'. Run 13-3/8" casing.
Mud Tv.De Mud Weight Viscosity
Spud 9.5 #/gal 137 Sec.
PV yP EJuid Loss Solids
16 30 0.0 cc 7.5%
Temp
oF
Survey ~ Angle
N-~; E-W
Section Coordinate ,Coordinate
Dog Leg
o/100'
Reviewed By:
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Mc~nday, October 15. 1990
WELL: F-38 (31-03-11-13~ APl No.
~;0-029-22093
Day: .6.
Depth at 0600 Hrs. =
72 Hour Footage =
2.510 Ft.
10 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Riq #22-E
1253O5
Current Operation: Drilling 12-1/4" hole.
Summary of Last 72 Hours:
Run and cement 13,3/8" casing. Test BOPs. Drill out cement.
Mud Type Mud Weight Viscosity p V
LSND 8.9 #/gal 33 Sec. 8
yP. Fluid Loss Solids Temo
2 12.0 cc 3% °F
Sun/ev Deoth Anale Direction TVD
N-S E-W Dgg Leg
Section Coordinate Coordinate °/100'
Reviewed By: ,~~_~
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Tuesday. October 16, 1990
WELL: F-38 (31-03-11-13) APl No.
50-029-22093
Day: Z
Depth at 0600 Hrs. =
24 Hour Footage ---
2.917 Ft.
407 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #22-E
1253O5
Current Operation: Tripping.
St~mmary 9f Last ,24. Hours'
Drill to 2917'. Trip for motor change.
Mud Type Mud Weight Viscosity
LSND 9.1 #/gal 35 Sec.
p V yp. Fluid Loss Solids Temp
7 4 16.2 cc 6 % °F
Survey Depth Angle Direction
TVD
N-$ E-W Dog Leg
Section Coordinate Coordinate °/100;
Reviewed By' I~'~"~:~._
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Wednesday. October 17, !990
WELL: F-38 (31-03-11-13) AP! No.
50-029-22093
Day:..8_
Depth at 0600 Hrs. =
24 Hour Footage =
4,035 Ft.
1,118 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nab0rs Rig #22-E
125305
Current Operation' POH.
Summary of Last 24 Hours:
Drill to 3527'. Trip for assembly change.
Ddil to 4O35'.
POH.
.Mud Type Mud Weight Viscosity
L.S. 9.1 #/gal 37 Sec.
P V .YP. Fluid Loss .Solids Temo
7 5 12.0 cc ,..._ 5% °F
~ Depth Angle Direction
TVD
N-$ E-W Dog Leg
Section Coordinate Coordinate 0/100!
Reviewed By: MJ$
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Thursda, y, October 18. 1990
WELL: F-38 (31-03-11-13), AP! No.
~0-029-22093
Day: 9
Depth at 0600 Hrs. =
24 Hour Footage =
5,242 Ft.
1,207 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors, ,.Rig #22-E
125305
Current Operation' Drilling.
Summary of Last 24 Hours:
Trip for BHA change. Drill 12-1/4" to 5242'.
Mud Tvae Mud Weiaht Viscosity
LSND 9.3 #/gal 39 Sec.
? V YP Fluid Loss Solids Temp
9 7 9.8 cc 7% 78 °F
Survey Death Angle Direction
TVD
N-$ E-W Dog Leg
Section .Coordinate Coordinate °/100'
Reviewed By: MJ$
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRIJDHOE BAY UNIT
As of 0600 Hrs. Friday. October 19, 1990
WELL: F-38 f31-03-11-13) APl No.
50-029-22093
Day' 1 0
Depth at 0600 Hrs. =
24 Hour Footage =
5,894 Ft.
652. Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #22-E
1253O5
Current Operation: Drilling.
Summary_ of Last 24 Hours'
Drilled to 5305'. Tdp for BHA change.
Drill to 5894'.
Mud Type Mud Weight Viscosity
LSND 9.3 #/gal 40 Sec.
P, V YP Fluid Loss Solids Temp
9 8 10.0 cc 7% °F
Survey Death
E-W. Dog Leg
TVD Sectioq Coordinate Coordinate °/100'
Reviewed By' MJ,.¢
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Monday. October 22, 1990
WELL: F-3.$ (31-03-11-13) APl No.
~0-029-22093
Day: 13
Depth at 0600 Hrs, =
72 Hour Footage =
7,815 Ft.
,120 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #22-E
125305
Current ODeration: Tripping.
Summary of Last 72 Hours:
Drill to 12-1/4" to 7815'.
Mud Type
MSNO
Mud Weight
9.3 #/gal
Viscosity
38 Sec.
p¥ yP Fluid Loss SQlids Temp
1 1 9 5.2 cc 7% °F
Survey Deoth Anale
TVD
N-$ E-W Dog Leg
Section Ooordinate Coordinate °/100'
Reviewed By: MJS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Tuesday. October 23. 1990
WELL: F-~$ (~1-0~-11,-13) AP! No.
~0-029-22093
Day' 1 4
Depth at 0600 Hrs. =
24 Hour Footage =
7,954 Ft.
1,.14 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs --
Estimated Final Cost =
Nabors Rig #22-E
125305
Current Operation: Tripping.
Summary of Last 24 Hours:
Ddll to 7954'. Trip for assembly change.
Mud Type ,, Mud Weight
MSND 9.3 Cf/gal
Viscosity
.
39 Sec.
P¥ YP Fluid Loss Solids Tem.o
1 1 16 5.4 cc 5% °F
Survey ~ n~¢.¢¢.
N-$ E-W. ~
TVD Section Ooordinate Ooo. rdinat~ °/100,
Reviewed By' MJ$
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Wednesday, October 24. 1990
WELL: F-38 (31-03-11-13~ AP! No.
5O-O29-22O93
Day: 1 5
Depth at 0600 Hrs. =
24 Hour Footage =
8,800 Ft.
849 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
,Nabor,.s Rig #22-E
125305
Current OperatiQn: Drilling.
Summary of Last 24 H0ur~:
Drill 12-1/4" hole to 8492'. Trip for assembly change. Trip to 8800'.
Mud Tyoe Mud Weight Viscosity P V YP
LSND 9.5 #/gal 35 Sec. 1 2 7
Fluid Loss Solids Tem,o
5.6 cc 6% °F
Survey D_EE~ Angle Directiorl TVD
N-$ E-W Dod Leq
Section Coordinate Coordinate °/100'
Reviewed By: MJS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Thursday. October 25, 1990
WELL: F-38 (31-03-11-13) AP! No.
50-029-22093
Day: 1 6
Depth at 0600 Hrs. =
24 Hour Footage =
9.354 Ft.
554 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabor$ Rig #22-E
1253O5
Current Operation' Drilling.
Summary of Last 24 Hours:
Drill to 9328'. Trip to pick up motor.
Drill to 9354'.
Mud Type Mud Weight Viscosity
LSND 9.6 #/gal 37 Sec.
pv YP Fluid Loss Solids Temo
1 1 5 5.8 cc 7% °F
Survey Depth Angle Direction
N-S E-W Doq Leg
TVB Section Coordinate Coordinate °/100'
Reviewed By' MJS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: P. RU, DHOE BAY UNIT
As of 0600 Hrs. Friday. October 26. 1990
WELL: F,-,38 (31-03-1,1-13~ APl No.
~0-029-22093
Day' 1 7
Depth at 0600 Hrs. =
24 Hour Footage =
9.940 Ft.
586 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabor~; Rig #22-E
125305
Current Operation' Drilling.
Summary of Last .2 .4 Hours'
Drill to 9446'. Trip for assembly change. Drill to 9940'.
Mud Tv.De Mud Weight Viscosity
LSND 9.6 #/gal 38 Sec.
P V ,YP, Fluid Loss Solids Temp
1 1 7 5.6 cc 7% °F
Survey D..e. Et.b Angle J2LEe,.6tJ.g.E TVD
N-S E-W Dog Leg
Section Coordinate Coordinate °/100'
Reviewed By: MJS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Monday. October 29. 1990
WELL: F-38 (31-03-11-13), APl No.
50-029-22093
Day: 20
Depth at 0600 Hrs. =
72 Hour Footage =
10,095 Ft.
155 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabor$ Rig #22-E
125305
Current Operation: Tripping in with 8-1/2" BHA.
Summary. of Last 72 Hours:
Drill to 10,095'. Run logs. Run and cement 9-5/8" Casing.
RIH to drill out.
Mud Type Mud Weight Viscosity
LSND 9.0 #/gal 35 Sec.
PV YP. Fluid Loss Solids
7 4 8.8 cc 5%
Temr
Survey Depth Angle Direction TVD
N-S E-W
Section Coordinate Coordinate
Dog. Le[
°/10C
Reviewed By: MJS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRI. JDHOE BAY UNIT
As of 0600 Hrs. Tuesday. October 30. 1990
WELL: F-38 (31-03-11-13~ APl No.
50-029-22093
Day: 21
Depth at 0600 Hrs. = 10.720 Ft.
24 Hour Footage = 625 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #22-E
125305
Current Operation' Tripping.
Summary of Last 24 Hours'
Drill out 9-5/8" shoe. Ddil 8-1/2" to 10720' TD. POH.
Mud Type Mud Weight ~iscosit¥
LSND 8.8 #/gal 35 Sec.
? ¥ YP Fluid Loss Solids Temp
9 7 10.2 cc 5% °F
Survey Depth ,Artgle D_J.EEqt[~
N-$ E-W Dog Leg
TVD Section Coordinate Coordinate °/100'
Reviewed By' MJ$
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT.
As of 0600 Hrs. Wednesday. October 31, 1990
WELL: F-38 (31-03-11-13~ APl No.
50-O29-22O93
Day' 22~
Depth at 0600 Hrs. = 10,720 Ft.
24 Hour Footage = _0. Ft.
Rig:
AFE Number:
AFF: Amount =
Current Costs =
Estimated Final Cost =
Nab0r$ Rig #22-E
125305
Current Operation' RIH with 7" liner.
Summary of Last 24 Hours'
Ran open hole logs. Ran wiper trip and circulated bottom up.
Rig up and run 7" liner.
Mud Type Mud Weight Viscosity P V
LSND 8.9 Cf/gal 34 Sec. 5
yP Fluid Loss Solids Temo
8 10.4 cc 5% 92 °F
Survey Depth Angle Direction TVD
N-$ E-W Doq Leg
Section Coordinate Coordinate °/100'
Reviewed By: dh
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UN!,T.
As of 0600 Hrs. Thursday, November 1, 1990
WELL: F-38 (31-03-11.13) APl No.
50-029-22093
Day: 23.
Depth at 0600 Hrs. = 10.720 Ft.
24 Hour Footage = 0 Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs-
Estimated Final Cost =
Nabors Ria #22-E
--
125305
Current OperatiQn' TIH w/8-1/2" bit.
Summary. of Last 24, Hours'
Ran and cemented 7" liner. POOH with liner running tool.
JV!,ud Type Mud Weight Viscosity
LSND 8.9 #/gal 34 Sec.
PV YP Fluid Loss Solids 8 5 10.5 cc 5%
Survey Depth Angle DirectiQn TVD
N-S E-W Dog Leg
Secti~)r~ Coordinate Coordinate 0/100!
Reviewed By: MJS
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Friday, November 2, 1990
WELL: F-38 (31-03-11-13} AP! No.
50-029-22093
Day: 24
Depth at 0600 Hrs. =
24 Hour Footage =
10,720 Ft.
O Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
NcbQr$ Rig #22-E
125305
Current Operation: Displacing mud with brine water.
Summary of Last 24 Hours:
Cleaned out cement inside of liner to float collar (10678' MD). Tested 5-1/2" liner to 3000 psi, ok.
Pumped away excess mud down 13-3/8" x 9-5/8" annulus.
MudType Mud Weight ,Viscosity P V YP Fluid Loss Solids Temp
LSND 9.0 #/gal 48 Sec. 1 2 7 20.0 cc 6% °F
Survey Depth Angle Direction 'D/D
N-$. E-W Dog Leg
Section Coordinate Coordinate °/100'
Reviewed By: dh
BP EXPLORATION (ALASKA), INC.
DAILY DRILLING REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Monday, November 5. 1990
WELL: F-38 (31-03-11-1~), APl No.
5O-029-22O93
Day: 2,6.
Depth at 0600 Hrs. = 10,720 Ft.
72 Hour Footage = O Ft.
Rig:
AFE Number:
AFE Amount =
Current Costs =
Estimated Final Cost =
Nabors Rig #22-E
1253O5
Current Operation: Rig released @ 1430 hrs, 11-4-90.
Summary_ of Last 72 Hours:
Displaced mud with completion fluid. Ran 4-1/2" tubing. Freeze protected tubing annulus with
diesel. Pressure tested tubing annulus to 2500 psi, ok. Freeze protected casing annulus with
diesel. Cleaned up the pit and released the rig @ 1430 hrs, 11-4-90 for F-39.
Mud Type Mud Weight yiscosity P V YP. Fluid Loss Solids Temp
Brine 8.6 #/gal Sec. cc °F
Survey, Depth. Angle Direction
.N-S E-w. Dog Leg
TVD Section Coordinate Coordinate °/100'
Reviewed By: ¢'h
.A
SUB.$URFACE
DIRECTIONAL
$URVEY
F~UIDANCE
[~]ONTINUOUS
FfIOoL
Alaska Oil .& Gas Co~s. Commission's.
;~nchora§o
Company
Well Name
Field/Location
BP EXPLORATION
P-19 (2319' NSL,2057' EWL,SEC 31,T11N,R13E)
PRUDHOE BAY, NORTH SLOPE, ALASKA
Job Reference No.
74266
Logged By:
JOHNSON
Date
16-DEC-90
Computed By:
KRUWELL
* SCHLUMBERGER *
, *
********************
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
BP EXPLORATION
P-19 (41-06-10-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
SURVEY DATE: 16-DEC-1990
ENGINEER: G. JOHNSON
METHODS OF COMPUTATION
TOOL LOCATION: TANGENTIAL- Avecaged deviation amd azimuth
INTERPOLATION: LINEAR
VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 31 DEG 18 MIN EAST
BP EXPLORATION
P-19 (41-06-10-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
0 O0
100 O0
200 O0
300 O0
400 O0
500 O0
600 O0
7O0 O0
800 O0
900 O0
0.00
lO0.O0
200.00
300.00
40O O0
500 O0
600 O0
700 O0
799 99
899 99
COMPUTATION DATE: 31-DEC-90 PAGE 1
DATE OF SURVEY: 16-DEC-1990
KELLY BUSHING ELEVATION: 91.90 FT
ENGINEER: G. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
0 0 N 0 0 E
0 13 S 14 35 E
0 11 S 11 45 E
0 11 S 26 37 E
0 10 S 27 14 E
0 11 S 22 37 E
0 15 S 23 49 E
0 17 S 29 16 E
0 17 S 18 57 E
0 18 S 6 3 E
1000 O0
1100
1200
1300
1400
1500
1600
1700
1800
1900
999 99
O0 1099
O0 1199
O0 1299
O0 1399
O0 1499
O0 1599
O0 1699
O0 1799
O0 1899
-91 90
810
108 10
208 10
308 10
408 10
508 10
608 10
708 09
808 09
0 9 S 31 37 E
0 15 S 74 31 E
0 19 S 59 51 E
0 16 S 39 5 E
0 18 S 12 28 W
0 15 S 33 27 E
0 21 S 14 41 W
0 11 S 10 17 W
0 19 S 30 13 E
0 21 S 26 20 E
908.09
99 1008.09
99 1108.09
99 1208.09
99 1308.09
99 1408.09
99 1508.09
99 1608.09
98 1708.08
98 1808.08
2000 O0 1999 98 1908 08
O0 2099
O0 2199
O0 2299
O0 2399
O0 2499
O0 2599
O0 2699
O0 2799
O0 2899
98 2008
98 2108
97 2208
96 2308
95 2408
94 2508
92 2608
91 2708
90 2808
O8
O8
O7
O6
O5
O4
02
01
O0
0 15 S 43 47 E
022 S 9 9 E
0 31 S 30 46 E
0 39 S 31 14 E
0 47 S 26 0 E
0 58 S 17 30 E
1 0 S 19 45 E
1 0 S 21 51 E
0 58 S 18 1 E
0 54 S 14 58 E
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000 O0 2999.88 2907.98
O0 3099.87 3007.97
O0 3199.86 3107.96
O0 3299.85 3207.95
O0 3399 84 3307'.94
O0 3499 84 3407.94
O0 3599 83 3507.93
O0 3699 83 3607.93
O0 3799 83 3707.93
O0 3899 83 3807.93
0 49 S 11 19 E
0 51 S 4 22 E
0 50 S 8 55 W
0 47 S 16 44 W
0 40 S 37 0 W
0 36 S 47 36 W
0 26 S 60 36 W
0 25 S 62 23 W
0 12 S 30 27 W
0 13 S 5 2 E
3100
3200
3300
3400
3500
3600
3700
3800
3900
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 O0
0 2O
051
0 83
1 12
1 45
1 81
2 25
2 74
3 2O
3 58
3 83
4 25
4 70
5 19
5 51
601
631
6 72
731
791
8 37
9 13
10 10
11 35
12 84
14 51
16.23
17.91
19.43
2O 90
22 24
23 49
24 50
25 20
25 52
25 60
25 54
25 60
25 88
0 O0
0 04
0 O0
0 O0
0 O0
0 O0
0 15
0 O0
0 O0
0 11
0 25
0 O0
O01
0 16
0 36
012
015
015
0 28
0 O0
0 25
0 O0
0 82
0 O0
0 12
0 04
012
0 O0
0 43
0 O0
0 30
0 02
016
0 O0
012
0 O0
0 O0
0 O0
0 O8
0 O0
0.00 N
0.17 S
0.50 S
0 81 S
1 06 S
1 36 S
1705
2 10 S
2545
301 S
3.4O S
3.50 S
3.70 S
4.00 S
4.5O S
4.82 S
5.33 S
5.77 S
6.10 S
6.64 S
7.16 S
7565
8325
9125
10 23 S
11 61 S
13 25 S
14.89 S
16.45 S
17.98 S
19.48 S
20.90 S
22.39 S
23.77 S
24 92 S
25 74 S
26 27 S
26 61 S
26 96 S
27 30 S
0 O0 E
0 11 E
0 17 E
0 28 E
041 E
0 55 E
0 68 E
0 89 E
1 09 E
1 20 E
1 30 E
1 61 E
2 09 E
2 47 E
2 58 E
2 69 E
2 80 E
2 66 E
2 90 E
3 16 E
3 45 E
3 67 E
3 89 E
4 43 E
5 03 E
5 62 E
6 14 E
6.76 E
7.41 E
7.83 E
8 19 E
8 43 E
8 40 E
8 07 E
7 53 E
6 78 E
6 06 E
5 40 E
493 E
4 92 E
0 O0 N 0 0 E
20 S 33 15 E
53 S 18 24 E
85 S 18 53 E
14 S 21 3 E
47 S 21 58 E
83 S 21 43 E
28 S 23 1 E
76 S 23 15 E
24 S 21 45 E
3 64 S 20 59 E
85 S 24 47 E
25 S 29 28 E
70 S 31 44 E
19 S 29 52 E
52 S 29 9 E
02 S 27 44 E
35 S 24 46 E
75 S 25 24 E
35 S 25 26 E
7 94 S 25 44 E
8 41 S 25 53 E
9 19 S 25 4 E
10 14 S 25 55 E
11 40 S 26 10 E
12 90 S 25 48 E
14 60 S 24 53 E
16.35 S 24 25 E
18.04 S 24 15 E
19.61 S 23 32 E
21.13 S 22 48 E
22.54 S 21 58 E
23.91 S 20 34 E
25.10 S 18 45 E
26 03 S 16 48 E
26 62 S 14 45 E
26 96 S 12 59 E
27 15 S 11 29 E
27 41 S 10 22 E
27 74 S 10 13 E
COMPUTATION DATE: 31-DEC-90
PAGE 2
BP EXPLORATION
P-19 (41-06-10-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 16-DEC-1990
KELLY BUSHING ELEVATION: 91.90 FT
ENGINEER: G. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUT~
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN
4000 O0 3999.83 3907.93 1 5 S 25 42 E
4100
4200
4300
4400
4500
4600
4700
4800
4900
O0 4099.67 4007.77 4 27 S 29 54 E
O0 4199.21 4107.31 6 46 S 26 52 E 41
O0 4298.16 4206.26 9 45 S 32 8 E 55
O0 4396,22 4304 32 12 58 S 36 7 E 75
O0 4492.91 4401 01 16 27 S 38 4 E 100
O0 4587.82 4495 92 20 25 S 37 54 E 131
O0 4680.06 4588 16 24 25 S 40 47 E 169
O0 4770,19 4678 29 26 57 S 41 27 E 212
O0 4858.26 4766 36 29 31 S 41 53 E 259
26.56
31 87
36
73
25
57
77
94
60
17
3.49
2.63
3.39
3.69
4.06
2.85
5.24
2.55
2.61
2.31
27 96 S 5.15 E 28.43 S 10 26 E
32 53 S 7.84 E 33,46 S 13 33 E
41 02 S 12.15 E 42.78 S 16 30 E
53 44 S 19 37 E 56.85 S 19 56 E
69 65 S 30 28 E 75.95 S 23 30 E
89 92 S 45 69 E 100.86 S 26 56 E
114.66 S 65 07 E 131.83 S 29 34 E
144.41 S 89 60 E 169.94 S 31 49 E
177.01 S 118 09 E 212.79 S 33 43 E
212.38 S 149 56 E 259.76 S 35 9 E
5000.00 4944.28 4852.38 31 43 S 42 21 E 309 26
5100.00 5028.33 4936.43 33 56 S 43 4 E 362 37
5200.00 5110.42 5018.52 35 28 S 43 40 E 418 19
5300.00 5191 93 5100 03 35 20 S 44 17 E 474 71
5400.00 5273 58 5181 68 35 9 S 44 34 E 530 94
5500.00 5355 25 5263 35 35 26 S 44 37 E 587 10
5600.00 5436 86 5344 96 35 17 S 44 57 E 643.29
5700.00 5518 35 5426 45 35 32 S 45 3 E 699.60
5800.00 5599 58 5507 68 35 46 S 45 13 E 756.24
5900.00 5680 82 5588 92 35 31 S 45 42 E 812.78
1 97
2 34
0 52
0 42
0 27
0 57
041
0 24
0 34
0 30
250.23 S 183 73 E 310 44 S 36 17 E
290.07 S 220
331.52 S 259
373.21 S 299
414.44 S 340
455.53 S 380
496.54 S 421
537.52 S 462
578.69 S 503
619.62 S 545
44 E 364
70 E 421
93 E 478
34 E 536
86 E 593
58 E 651
55 E 709
88 E 767
39 E 825
32 S 37 14 E
13 S 38 4 E
79 S 38 47 E
28 S 39 24 E
77 S 39 54 E
37 S 40 20 E
15 S 40 43 E
31 S 41 3 E
46 S 41 21 E
6DO0 O0 5762.32 5670 42 35 14 S 46 16 E 868.85
6100
6200
6300
640O
6500
6600
67OO
6800
6900
O0 5844.27 5752 37 34 39 S 46 36 E 924.17
O0 5926.75 5834 85 34 13 S 47 7 E 978.65
O0 6009.60 5917 70 33 48 S 47 28 E 1032.48
O0 6092.97 6001 07 33 16 S 47 30 E 1085.50
O0 6177.01 6085 11 32 26 S 47 16 E 1137.59
O0 6261.56 6169 66 32 6 S 46 47 E 1188.97
O0 6346.62 6254.72 31 19 S 45 50 E 1239.75
O0 6432.21 6340.31 31 3 S 44 36 E 1289.94
O0 6517.95 6426.05 30 51 S 42 56 E 1340.20
0.54
0.54
0.52
0.64
0.52
O.54
0.73
0.76
0.77
0.94
659.89 S 587.07 E 883 24 S 41 39 E
699.40 S 628.57 E 940
738.08 S 669.82 E 996
776 07 S 710.95 E 1052
813 37 S 751.68 E 1107
850 08 S 791.55 E 1161
886 44 S 830.65 E 1214
922 76 S 868.68 E 1267
959 16 S 905.40 E 1318
996 35 S 940.99 E 1370
36 S 41 57 E
71 S 42 13 E
49 S 42 30 E
52 S 42 45 E
55 S 42 57 E
81 S 43 8 E
32 S 43 16 E
99 S 43 21 E
46 S 43 22 E
7000 O0 6603 93 6512.03 30 33 S 41 25 E 1390 34
7100
7200
7300
7400
7500
7600
7700
7800
7900
O0 6690
O0 6776
O0 6863
O0 6950
O0 7037
O0 7123
O0 72O6
O0 7288
O0 7371
16 6598 26 30 21 S 40 7 E 1440
55 6684
20 6771
35 6858
57 6945
10 7031
23 7114
98 7197
94 7280
65 30 10 S 38 54 E 1490
30 29 43 S 37 16 E 1539
45 28 59 S 34 55 E 1588
67 30 7 S 33 56 E 1637
20 32 27 S 33 30 E 1689
33 34 32 S 33 58 E 1744
08 33 42 S 32 59 E 1800
30
14
71
57
40
15
68
77
04 34 36 S 31 56 E 1856.60
0.80 1034.20 S 975 25 E 1421.50 S 43 19 E
1 07 1072.58 S 1008
81 1111,41 S 1040
15 1150.69 S 1071
22 1190.30 S 1100
43 1230.71 S 1127
33 1273.78 S 1156
11 1320.02 S 1187
93 1366.81 S 1218
01 1413.94 S 1248
29 E 1472.10 S 43 14 E
34 E 1522.35 S 43 6 E
16 E 1572.09 S 42 57 E
06 E 1620.79 S 42 45 E
60 E 1669.17 S 42 30 E
39 E 1720.39 S 42 14 E
20 E 1775.36 S 41 58 E
23 E 1830.91 S 41 43 E
17 E 1886.04 S 41 26 E
COMPUTATION DATE: 31-DEC-90
PAGE 3
BP EXPLORATION
P-19 (41-06-10-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 16-DEC-1990
KELLY BUSHING ELEVATION: 91.90 FT
ENGINEER: G. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/100 FEET FEET FEET DEG MIN
8000 O0 7453 28 7361.38 36 25
8100
8200
8300
8400
8500
8600
8700
8800
890O
O0 7533
O0 7614
O0 7694
O0 7774
O0 7853
O0 7930
O0 8006
O0 8080
O0 8154
69 7441 79 36 23
36 7522
96 7603
71 7682
29 7761
55 7838
35 7914
51 7988
09 8062
46 36 5
06 36 35
81 37 4O
39 38 49
65 39 59
45 41 30
61 42 29
19 42 48
S 31 46 E 1914 75
S 30 31 E 1974
S 29 16 E 2033
S 28 17 E 2092
S 27 6 E 2152
S 26 1 E 2214
S 25 3 E 2277
S 24 7 E 2342
S 23 1 E 2408
S 22 50 E 2475
20
27
40
61
24
40
17
62
62
0 92
1 34
0 23
1 13
1 27
1 24
1 39
2 10
051
0 83
1463 34 S 1278 84 E 1943 40 S 41 9 E
1514
1565
1617
1670
1726
1783
1842
1904
1966
17 S 1309
46 S 1339
33 S 1367
77 S 1395
11 S 1423
40 S 1450
72 S 1477
27 S 1504
64 S 1530
68 E 2001
03 E 2060
54 E 2118
53 E 2176
15 E 2237
49 E 2298
60 E 2361
28 E 2426
65 E 2492
99 S 40 51 E
01 S 40 33 E
O0 S 4O 13 E
92 S 39 52 E
14 S 39 30 E
79 S 39 7 E
97 S 38 43 E
74 S 38 18 E
10 S 37 54 E
9000.00 8227 80 8135.90 42 15
9100.00 8302
9200.00 8378
9300.00 8455
9400 O0 8534
95O0 O0 8612
9600 O0 8691
9700 O0 8769
9800 O0 8847
9900 O0 8925
38 8210.48 41 12
25 8286.35 40 5
68 8363 78 38 14
35 8442 45 38 27
76 8520 86 38 17
18 8599 28 38 32
38 8677 48 38 32
29 8755 39 39 5
39 8833 49 37 57
S 21 22 E 2542 34
S 19 28 E 2607 76
S 16 36 E 2671 17
S 13 7 E 2731 89
S 11 1E 2790 12
S 8 34 E 2847 88
S 5 49 E 2904.50
S 3 7 E 2960.15
S 1 11 E 3014.69
S 3 50 E 3069.26
1 39
1 97
2 64
2 58
1 98
1 62
1 74
1 90
1 O0
3 63
2029.23 S 1556 13 E 2557.21 S 37 29 E
2091.62 S 1579 45 E 2620.98 S 37 3 E
2153.53 S 1599 69 E 2682.67 S 36 36 E
2214.66 S 1616 02 E 2741 58 S 36 7 E
2275.03 S 1628 81 E 2798 O0 S 35 36 E
2336.19 S 1639 41 E 2854 02 S 35 4 E
2397.74 S 1647 17 E 2909 O0 S 34 29 E
2459.87 S 1652 09 E 2963 17 S 33 53 E
2522.52 S 1654.04 E 3016 45 S 33 15 E
2584.91 S 1656.45 E 3070 12 S 32 39 E
10000.00 9003.71 8911.81 39 26
10100.00 9079.90 8988.00 41 14
10200'.00 9154.02 9062.12 43 11
10300.00 9226.91 9135.01 43 12
10360.00 9270.65 9178.75 43 12
S 8 13 E 3125.57
S 10 51 E 3185.75
S 13 15 E 3249.08
S 13 18 E 3314.32
S 13 18 E 3353.38
2.87
2.42
5.36
0.00
0.00
2646.70 S 1663.21 E 3125.91 S 32 9 E
2710.55 S 1674.05 E 3185.83 S 31 42 E
2776.21 S 1687.97 E 3249.08 S 31 18 E
2842.92 S 1703.81 E 3314.39 S 30 56 E
2882.90 S 1713.26 E 3353.56 S 30 43 E
COMPUTATION DATE: 31-DEC-90
PAGE 4
BP EXPLORATION
P-19 (41-06-10-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEV: 16-DEC-1990
KELLY BUSHING ELEVATION: 91.90 FT
ENGINEER: G. JOHNSON
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 O0
1000 O0 999
2000 O0 1999
3000 O0 2999
4000 O0 3999
5000 O0 4944
6000 O0 5762
7000 O0 6603
8000 O0 7453
9000 O0 8227
0 O0 -91.90 0 0
99 908.09 0 9
98 1908.08 0 15
88 2907.98 0 49
83 3907 93 1 5
28 4852 38 31 43
32 5670 42 35 14
93 6512 03 30 33
28 7361 38 36 25
80 8135 90 42 15
N 0 0 E
S 31 37 E 3
S 43 47 E 7
S 11 19 E 20
S 25 42 E 26
S 42 21 E 309
S 46 16 E 868
S 41 25 E 1390
S 31 46 E 1914
S 21 22 E 2542
0 O0
58
91
90
56
26
85
34
75
34
0 O0
0 25
0 25
0 3O
3 49
1 97
0 54
0 80
0 92
1 39
0 O0 N
3
7
19
27
250
659
1034
1463
2029
40 S 1
16 S 3
48 S 8
96 S 5
23 S 183
89 S 587
20 S 975
34 S 1278
23 S 1556
0 O0 E 0.00 N 0 0 E
30 E 3.64 S 20 59 E
.45 E 7.94 S 25 44 E
19 E 21.13 S 22 48 E
15 E 28.43 S 10 26 E
73 E 310.44 S 36 17 E
07 E 883.24 S 41 39 E
25 E 1421.50 S 43 19 E
84 E 1943.40 S 41 9 E
13 E 2557.21 S 37 29 E
10000.00 9003.71 8911.81 39 26 S 8 13 E 3125.57
10360.00 9270.65 9178.75 43 12 S 13 18 E 3353.38
2.87 2646.70 S 1663.21 E 3125.91 S 32 9 E
0.00 2882.90 S 1713.26 E 3353.56 S 30 43 E
COMPUTATION DATE: 31-DEC-90
PAGE 5
BP EXPLORATION
P-19 (41-06-10-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 16-DEC-1990
KELLY BUSHING ELEVATION: 91.90 FT
ENGINEER: G. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 O0
91 90
191 9O
291 90
391 9O
491 90
591 90
691 9O
791 91
891 91
0 O0
91 90
191 9O
291 90
391 9O
491 90
591 9O
691 9O
791 90
891 90
-91.90 0 0 N 0 0 E
0.00 0 13 S 17 57 E
100.00 0 11 S 12 15 E
200.00 0 10 S 26 17 E
300.00 0 10 S 29 8 E
400.00 0 11 S 24 18 E
500.00 0 14 S 22 6 E
600.00 0 16 S 29 5 E
700.00 0 17 S 19 8 E
800.00 0 17 S 5 52 E
0 O0
0 18
0 49
081
1 10
1 42
~ 77
2 22
2 7O
3 16
0 O0
0 17
0 O0
0 O0
0 O0
0 O0
0 O4
0 O0
0 O0
0 03
0.00 N
0.14 S
0.48 S
0 78 S
1 04 S
1 34 S
1 67 S
2065
2 50 S
2.97 S
0.00 E
0.10 E
0.16 E
0.26 E
0 40 E
0 54 E
0 66 E
0 87 E
1 08 E
1 20 E
0 O0 N 0 0 E
18 S 36 11 E
50 S 18 43 E
83 S 18 39 E
12 S 20 54 E
44 S 21 56 E
80 S 21 41 E
24 S 22 55 E
72 S 23 18 E
20 S 21 57 E
991 91
1091
1191
1291
1391
1491
1591
1691
1791
1891
91 1091.90 1000
91 1191.90 1100
91 1291.90 1200
91 1391.90 1300
91 1491.90 1400
91 1591.90 1500
91 1691.90 1600
.92 1791.90 1700
991.90 900 O0
O0
O0
O0
O0
O0
O0
O0
O0
92 1891.90 1800.00
0 9 S 25 24 E
0 15 S 76 54 E
0 19 S 60 40 E
0 16 S 41 37 E
0 19 S 8 19 W
0 15 S 33 52 E
0 21 S 11 27 W
0 12 S 13 20 W
0 19 S 34 3 E
0 21 S 26 42 E
3.56
3.80
4.21
4.66
5.15
5.48
5.97
6.29
6.67
7.26
0 O9
0 O0
0 O0
0 07
0 29
0 O8
018
0 23
0 4O
0 O0
3 38 S
3 49 S
3 68 S
3975
4 46 S
4795
5 28 S
5 74 S
6065
6595
1.29 E
1.58 E
2.05 E
2.45 E
2 59 E
2 67 E
281 E
2 67 E
2 87 E
3 13 E
3.62 S 20 57 E
3.83 S 24 23 E
4.22 S 29 9 E
4.66 S 31 4O E
5.15 S 30 10 E
5.48 S 29 8 E
5.98 S 28 1 E
6.33 S 24 54 E
6.71 S 25 21 E
7.30 S 25 26 E
1991 92 1991.90 1900.00
2091
2191
2291
2391
2491
2591
'2691
2791
2892
0 16
92 2091.90 2000.00 0 23
92 2191 90 2100.00 0 32
93 2291 90 2200.00 0 39
93 2391 90 2300.00 · 0 47
95 2491 90 2400.00 0 58
96 2591 90 2500.00 0 59
98 2691 90 2600.00 1 0
99 2791 90 2700.00 0 59
O0 2891 90 2800.00 0 54
S 39 42 E
S 8 9 E
S 24 53 E
S 31 51 E
S 26 20 E
S 18 18 E
S 19 9 E
S 21 40 E
S 20 6 E
S 14 53 E
7 87
8 32
9 O6
10 01
11 24
12 71
14 37
16 09
17 77
19 31
0 62
0 O0
0 89
0 O0
0 O4
016
0 O6
0 O0
0 59
0 O0
7.13 S
7.51 S
8.26 S
9.04 S
10.13 S
11.48 S
13.11 S
14.76 S
16.32 S
17.86 S
3.43 E
3.66 E
3.86 E
4.38 E
4.98 E
5.57 E
6.10 E
6.70 E
7.37 E
7.80 E
7 91 S 25 40 E
8
9
10
11
12
14
16
17
19
36 S 26 0 E
11 S 25 2 E
05 S 25 52 E
28 S 26 10 E
76 S 25 53 E
46 S 24 56 E
21 S 24 26 E
91 S 24 17 E
48 S 23 36 E
2992.01 2991.90 2900 O0
3092.03 3091,90 3000
3192.04 3191,90 3100
3292.05 3291.90 3200
3392.05 3391.90 3300
3492.06 3491.90 3400
3592.07 3591.90 3500
3692.07 3691.90 3600
3792.07 3791.90 3700
3892.07 3891.90 3800
0 51
O0 0 51
O0 0 51
O0 0 48
O0 0 40
O0 0 36
O0 0 26
O0 0 25
O0 0 13
O0 0 12
S 11 12 E
S 5 6 E
S 7 34 W
S 16 20 W
S 35 38 W
S 47 3 W
S 60 10 W
S 62 57 W
S 34 47 W
S 9 43 E
2O 79
22 13
23 4O
24 43
25 17
25 50
25 60
25 55
25 59
25 85
0 40
0 O8
0 19
0 O0
0 27
0 O0
0 O0
0 O0
0 24
0 19
19 36 S
2O 78 S
22 27 S
23 66 S
24 84 S
25 69 S
26 24 S
26 58 S
26.94 S
27.27 S
8.17 E
8.42 E
8.41 E
8.10 E
7.58 E
6.84 E
6.11 E
5.45 E
4.95 E
4.91 E
21 01 S 22 52 E
22
23
25
25
26
26
27
27
27
42 S 22 3 E
81 S 20 42 E
01 S 18 54 E
97 S 16 58 E
58 S 14 55 E
94 S 13 7 E
14 S 11 36 E
39 S 10 25 E
71 S 10 13 E
COMPUTATION DATE: 31-DEC-90
PAGE 6
BP EXPLORATION
P-19 (41-06-10-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 16-DEC-1990
KELLY BUSHING ELEVATION: 91.90 FT
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
21 4091
64 4191
65 4291
57 4391
95 4491
37 4591
02 4691
44 4791
84 4891
0 49
S 25 41 E
S 30 43 E
S 26 24 E
S 31 54 E
S 35 54 E
S 38 3 E
538 0 E
S 40 55 E
S 41 33 E
S 42 1 E
90 4000 O0 4 16
9O 4100 O0 6 31
9O 4200 O0 9 31
90 4300 O0 12 48
90 4400 O0 16 25
90 4500 O0 20 39
90 4600 O0 24 44
90 4700 O0 27 35
90 4800.00 30 25
ENGINEER: G. JOHNSON
3992 07 3991 90 3900.00
4092
4192
4293
4395
4498
4604
4713
4824
4938
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
5056.34 4991 90 4900.00 32 56
5177.28 5091 90 5000.00 35 18
5299.96 5191 90 5100.00 35 20
5422.40 5291 90 5200.00 35 8
5544.95 5391 90 5300.00 35 15
5667.51 5491 90 5400.00 35 29
5790.54 5591 90 5500.00 35 45
26 42
31 28
40 53
54 65
74 28
100 28
133 33
175 29
223 64
278 25
S 42 41 E 338.79
S 43 36 E 405.33
S 44 17 E 474.69
S 44 37 E 543.48
S 44 49 E 612.40
S 45 1 E 681.26
S 45 11 E 750.87
291
2 02
3 56
4 52
4 O3
2 87
5 28
2 48
2 64
2 35
27.83 S
32.02 S
40.27 S
52.53 S
68 87 S
89 69 S
115 89 S
148 52 S
185
226
5 09 E
7
11
18
29
45
66
93
42 S 125
83 S 162
54 E 32
78 E 41
8O E 55
72 E 75
51 E 100
04 E 133
15 E 175
53 E 223
54 E 279
28 29 S 10 22 E
89 S 13 15 E
96 S 16 18 E
80 S 19 42 E
01 S 23 20 E
58 S 26 54 E
39 S 29 40 E
31 S 32 6 E
91 S 34 6 E
05 S 35 37 E
2.35
1.16
0.42
0.21
0.65
0.16
0.31
272 42 S 204 07 E 340 37 S 36 50 E
321 99 S 250 62 E 408 03 S 37 54 E
373 19 S 299 91 E 478 77 S 38 47 E
423 62 S 349 39 E 549 12 S 39 31 E
474 02 S 399 15 E 619 69 S 40 6 E
524 18 S 449 20 E 690 33 S 40 36 E
574 79 S 499 96 E 761 80 S 41 1 E
5913.61 5691
6036.18 5791
6157.81 5891
90 5600.00 35 31
90 5700.00 35 4
90 5800.00 34 24
6278.67 5991 90 5900.00 33 56
6398.72 6091
6517.64 6191
6635.77 6291
6752.94 6391
6869.64 6491
6986.03 6591
7102.02 6691
7217.74 6791
7333.01 6891
9O 6000 O0 33 17
9O 6100
90 6200
90 6300
9O 64OO
90 6500
90 6600
90 67O0
90 6800
O0 32 21
O0 31 52
O0 31 6
O0 3O 57
O0 30 36
O0 3O 21
O0 30 6
O0 29 30
7447.49 6991 90 6900.00 29 1
7563.24 7091
7682.62 7191
7803.51 7291
7924.32 7391
8048.03 7491
8172.19 7591
8296.18 7691
8421.74 7791
90 7000.00 31 26
90 7100.00 34 27
90 7200.00 33 41
90 7300,00 35 5
90 7400.00 36 31
90 7500.00 36 9
90 7600.00 36 33
90 7700.00 37 54
8549.77 7891.90 7800.00 39 24
S 45 47 E 820.44
S 46 22 E 888.96
S 46 53 E 955.75
5 47 23 E 1021 05
S 47 30 E 1084
S 47 14 E 1146
S 46 28 E 1207
S 45 14 E 1266
S 43 25 E 1324
S 41 37 E 1383
S 40 6 E 1441
S 38 39 E 1498
S 36 34 E 1555
83
68
24
33
94
34
31
96
94
S 34 13 E 1611.52
S 33 45 E 1669.74
S 33 53 E 1734.85
S 32 57 E 1802.72
S 31 51 E 1870.48
S 31 21 E 1943.31
S 29 28 E 2016.89
S 28 20 E 2090.13
S 26 52 E 2165.89
S 25 32 E 2245.51
0.31
0.59
0.53
071
0 48
0 52
0 92
0 69
0 86
0 74
1.10
0.85
1 .32
1 .45
2.23
0.74
0 88
1 9O
0 92
0 83
1 08
1 29
1 34
625
674
721
14 S 551
28 S 602
86 S 652
05 E 833
13 E 904
43 E 973
34 S 41 24 E
O0 S 41 46 E
01 S 42 6 E
768.02 S 702 20 E 1040 65 S 42 26 E
812.90 S 751
856,51 S 798
899.46 S 644
941,97 S 888
984,98 S 930
1028.87 S 970
1073,36 S 1008
1118,36 S 1045
1163,73 S 1080
16 E 1106
49 E 1170
42 E 1233
25 E 1294
32 E 1354
55 E 1414
95 E 1473
91E 1531
96 E 1588
82 S 42 44 E
98 S 43 0 E
72 S 43 12 E
71 S 43 19 E
87 S 43 22 E
40 S 43 20 E
12 S 43 14 E
23 S 43 5 E
32 S 42 53 E
1209 24 S 1113 10 E 1643 55 S 42 38 E
1257
1311
1368
1425
1487
1551
1615
1682
1754
59 S 1145 63 E 1701
86 S 1181 71 E 1765
i44 S 1219 28 E 1832
73 S 1255 50 E 1899
68 S 1293 79 E 1971
17 S 1330 99 E 2043
32 S 1366.47 E 2115
64 S 1401.57 E 2189
40 S 1436.79 E 2267
18 S 42 20 E
62 S 42 1E
83 S 41 42 E
73 S 41 22 E
57 S 41 1 E
93 S 40 38 E
77 S 40 14 E
90 S 39 48 E
66 S 39 19 E
COMPUTATION DATE: 31-DEC-90
PAGE 7
BP EXPLORATION
P-19 (41-06-10-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 16-DEC-1990
KELLY BUSHING ELEVATION: 91.90 FT
ENGINEER: G. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
8680.74 7991.90 7900.00 41 10
8815.44 8091.90 8000.00 42 33
8951.41 8191.90 8100.00 42 30
9086.07 8291.90 8200.00 41 22
9217.81 8391.90 8300.00 39 50
9345.99 8491.90 8400.00 37 57
9473.43 8591.90 8500.00 38 16
9600.91 8691.90 8600.00 38 32
9728.82 8791.90 8700.00 38 40
9857.34 8891.90 8800.00 38 38
S 24 21 E 2329 54
S 22 59 E 2418 94
S 22 11 E 2510 03
S 19 48 E 2598 78
S 16 1E 2682 22
S 12 1 E 2758 71
S 9 17 E 2832 66
S 5 48 E 2905 01
5 2 11E 2975 93
S 2 16 E 3046.01
1 .90
0 63
1 18
1 86
2 64
1 38
2 17
1 75
2 30
2 32
1831.11 S 1472 39 E 2349 66 S 38 48 E
1913.87 S 1508
1998.82 S 1543
2082.97 S 1576
2164.51 $ 1602
2242.33 S 1622
2319.93 S 1636
2398.30 S 1647
2477.83 S 1652
2558.53 S 1655
35 E 2436
98 E 2525
40 E 2612
90 E 2693
14 E 2767
86 E 2839
23 E 2909
93 E 2978
09 E 3047
81 S 38 15 E
70 S 37 41 E
24 S 37 7 E
39 S 36 31 E
56 S 35 53 E
26 S 35 12 E
50 S 34 29 E
56 $ 33 42 E
19 S 32 54 E
9984.77 8991.90 8900.00 39 5
10115.99 9091.90 9000.00 41 32
10251.96 9191.90 9100.00 43 12
10360.00 9270.65 9178.75 43 12
S 7 44 E 3116.76
S 11 14 E 3195.65
S 13 18 E 3283.04
S 13 18 E 3353.38
3.08
2.42
0.00
0.00
2637.18 S 1661.91 E 3117.16 S 32 13 E
2720.91 S 1676.06 E 3195.70 S 31 38 E
2810.91 S 1696.26 E 3283.06 S 31 7 E
2882.90 S 1713.26 E 3353.56 5 30 43 E
SCHLUMBERGER
O I RECT I ONAL SURVEY
COMPANY BP EXPLORAT I ON
WELL P- 19
FI ELD PRUOHOE BAY
COUNTRY USA
RUN 1
DATE LOOOED 16 - DEC - 90
REFERENCE ?4266
~ELL' P-19 ....
(2319' NSL, 2057' EWL, SEC 3i '11N, R13E)
HORIZONTAL PROJECTZON
N~RTH 1000 REF 742S6
S~UTH -3000
-I000
8CI:ILE = l/~ IN/FT
· .,~-.,4-.~..4- ·
I i ~ i i~i i i ~ ~ ~ ~i?".,'-'~ ~ ~ ~ ~-YT"Y'__:;4'~F_~..._~ ~-~ ~
: - ~ :-~ ~ : : ~ } ' ~ i ~ ' J b~-~..~-.~..4..~-L.'--...'..~.. '..;.... '..-, '-'...~ ...... ~..'.,.' ..... ~ : :
~ ~ ~ :' ~ i ~i; ; , :T : .... T~T~ t : :T,:~% : t ~ t t "~'"?"%"'t'"t"'
~ ~4- ~
'"?r+~"-~"+'~"+"? ...... r'-r-~'" "m"?'~"? '-'~'-+'ff-.~ .....
: ~ : . : :
-~.~...~..~-.~...~..~.....4..4..-;.+..+.-~-.~-.-:..+.4...g..
i i : : :
~H~-~-~.-4-~-~--~ ~ ~ " ~-~+ ~ ~ ~.~--~---b~ .... b-~-~--~'---~--~---~..b.-.-~-~.~..-~- -~.-;..4-.-
~-~*'+-+--~-+-~," : .............. ~ ~ , -+~-"++~~ ~ ~ ~ ~ ~ , ~ .... +-+~ ~ ........ ~ ~ ..... ~'-+'"t'~ ~ ~ , ....... H-.+.;..-~--+-f'-~-'9"-'+"bF+--~---bHH+ ...... f-+-+--~'-'f'~-b'H
~-~-.,.~.-~..-,...~-4-4.~-~4---,.~ ~ .... ~.+~.~-...~-~.-~. ~.~.--~.~-,~.-,..~-~4 ~.~-+.~..,..,..,..~--.,..,...-~-~ ...... ~-,~.-
"T'T-T?t~--Y~"~~? i T~ ~ i ~ i J "~-T""T~'~- ~'~ :i *'~-? .... ~'T-
'T'YT~'~- ~ J J
: : i I I : i i i i I ; ' ; '
] i i j I ~ I ! ]j i I' I : J~ ! ~ ~ I jj J J ~ ! }:]q'-~-' l~ ~'~1 J J
]'~'Y':"'-j'TI"'T"~H'~-~:i i,
· ~4~..~
L~.L...~..g~-~...~_~ ~ ~ ~ ~ ~ i ~ ~ ~
--.i..+..H+.- ,--+--H-?~ ....... f.++-~...-H~-+--~ ......
-r.-,--T-?-
~ ~: ~ ~: i: ! ~ ~ ~ ~ ~ ~ ~ -~ ]-~. ~-H--~..H-H"-'-+H-'+-' ..+..H.~--~-H..1 -+.+-~
~ ~ I ~ I I i J I I ! ~ ~ i ~ i .~ ~-~ :_?.~_?.~....l~_~_ ?'~'T~ ...... ~'~"~"'~ ...... ~"~-~'~
.................. I I~ ~i: ~ "~:-~--~:Ti~ ~ .... i .....
Ill[:
i ! i~ ~ ~ ~ i~ ~ ~ ~i ~ ~: ~l~_~..l.~.~...~ ....... LZbZ.~LL.~-.--~-ZL~ ..... LZLL
IIII I
li~i ~l i ~ ~i ~,~l ~ ~ ~:~Z~4-~..~-~..1-~h.f.~ ...... t"t"?"~'?~""~"~"Y'~"'"~"?"~'"t"
.................. , ..... ~-~.,..._+..~
i
,,, .............. .... ......
-500 0 SOO 1000 1500 2000 :;>500 3000
ERST
~ELL: P- 19 ~-
(2319' NSL, 2057' EWL, SEC 3~ ,'llN, R13E)
VERTICAL PROJECTION
-L~C~__ - 1000 0 0 ! 000 ~ ~ 4000.__~
~'.~ ~ ~ ~ ~1,~ I~T~"~T ~ ~??~r~ ..... ~'~'=-t .... :-'-~--: ..... T?"t--~-.V...: .......
i ) ! ( ~ ) I i ! I i ' I I ~ - j i i i ~ ~ ' - I i ~ ~ ~ ~ i; i -f ....... -- -- -?+- -f -'i ...... ~'"f'v", --"T'-t'm'f?)-
i ~ : ~ ; ! i i i . ! i i 1 F 1 · ~ ~ ~ q ~ i i ~ i j : : j ~ : i ; i i ~-~-~'~-~ i ~ ~--+.-~ ....... ~.-4-..~-.-~ .... ~-~.-~.-.~ ...... ~..-*-~-..~.-.~...'-.~.4--~.--
' ~ I : ' ; ~ ' ; = ; ~ : : ' .... I ' '
I J , I [ [ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ j j J J J ! i j ' i i j j ~ : i J ~ ] ~ ! ~ ~ 'T~-~'"'~'+"+'+~'+--+'+'+'+-"~"+~
- , - , : . ~ ~ - , , _ , . . ! , , , , , · - · ~ ~ i ~ 4
!l!!lJ!)l !l!i iii! ljil lli! J I I I !Ii Ilii i ) il)I i~); ; iii : ,:
l!l i i iii iii; .....
I~ , ..... ,,, · , : ~,,. .,~. .~,. ,,, I ........ ,. ,l~, ',,
l!~ ! ! l! i !l i i il i~ ~_.J_L~{ {~{~ ~ ii l ii ~li ~ i i i iii
~ - i i i i : ; : I : i i i
I I 1! i i i i ) i i iii ) HIIIlll I, l~. ii i i !i i I I VtD~ Ii I~CI' ' .)[~,1 .... l~i ) ' t
I
~" '~"++----+.++ ~
I
11 Ii
~ , ~i ~-~-~ ~ q i ~i: 'i:' !ili Ifil llll
...... , ,; ~ , . I.~ Illl l!i! ill! I1~;- liii l, ~
' j~ 1,. --- ...... Ji i~
illl. !,,~, .... ~iii I.~_ _ L~ i ii!! I!ii ~ ~I I1i iii '''" · ' iJ' '' ',i ! .....! , 1,~!'~ ...... I~ ~
'' ~ ! ~i,i ~_i~.~_,_]..~.4! ! ~ ~ ! ffX~ ~i i ~ i i i i. ~ ' ~ ''~'- '~ ...... t~'*~'"'"'"'~"~-
: %;~.-~'.' 4- J ! 4-3 ..... ' ~..i .... ~.~.4..4..
~i j I i ~ i~) LLi i Ii i i J {I i i Ii ~j j j ii i ] r ~, I I IT~i I
111!
I i i ! I ~ ~I ~l [ I i i i ! { : ~ ~ N i i
{Ill i !ii
II I!!i
I I ~ ~ ' ' i:i ! i i i i_i i ~ ~ ~ i i i ~ ~ I I i ! i I i I I i i ~ ~ i i i ~ '~ i~T"'
J J i I i i i ~ ~ i i~ i ~ { ~ ~ i ~ ~ ~ ' : I ' i i i ~ i i i i i i j i I } ''~'~' ~--'~ff''~''~'' ..'~''~.T~
i , , i ~ ~ q~ .... ~ ' ' ' el ~ i ~ I i l~: ~ ~ · ~, ~ ~ ~.i~-~.~¥.-~..,ff.~....l-+-4-~ ...... ~.-;..*.~
Jl
-- -~ ...... ~-4 .......4-4..-~--' : ~ i q ' ' -" ' ; ; ' '~ ~--''~ .... '.---' '~ '- 4-'
~i~iI 1 .~l I i i I'~-??''i-'r''i-'~''~'i, i , ~ ~ I , ~ ...... i"+ff'"~;; ~ .... H-i'4"'i ! ~ ~ "++t~ '-~-~+' :~ ~ ; II , , -~-F~--~-.a~ 4--~-4-.-i-- , , , I i i i ~ i i I ! i~ i ~ i-i { i ~.] .... ~ ...... ~'"i"T"~ ..... ~"'¥?'~'"; "'~"T"7'T'
' , ~ ~ ~ ++..-~--.;.-4..~-~ ...... g-~,+-.i ...... ;..~,~.g ..... i..4..~.~.-
....... ~ , ~ ~ I ~ I I I J i .......... +~ ..... + ......... ~ ....................
I!!i !I~ ,,,~ iii. ~U~]i~:~ ~, iili II}I :~ - - ~ ~ ' ~ ~ : ~ : ' ~
' ' , i i ~ ~ ~'~' ~'+'?'?" "T'?'*''+'' ~"~"~'~"~ ....... ~-'~? .......... ?"~"~"?
.~11 Iii! !!!Ii I!iii il!lili! iili!iii ii'I1 I iii}it ! I~,!1~ ''''!iii~i~'l [~+~ - ,~ ~4~I ;-~4 ~41i
!III Ilii !ili i!ii {_iii i{{J im { i!ii i i~ : i~ii I i i i
I I I ! i I ! ~ ~ ~ ~ ~ L~ ~ ~ i ~ I ~ ! i I i~ ~ j ! i"i ~'~'FTT~T"-~'~'F'T"-T'T'T"~ ....... T'T'TT"
· ,,t I m J j ,i J I, 1 i , :l ~ , , = . ~ : , , , ,' 'T]-"}-T'~] , ,{ f ,{ ,l ' ,,i { j' J i j i T- , , ~ ~'~"T"T'T-"T'"T' ~T"'~'T"T ...... T'"T'~'"T ......
I I J , I ' ..... ": : ~ i { ~ i ~ , i I ~ f~ ~-i ~ i +-+~--~--'+ ...... +.'~-+.-+ ...... +.-~-~-.+-
, ....... - .! I ~ : ' ~ ~'-~' ~ff-+"~'--~-+~ ..... ~-~-~"i .....!'"i"~'l~ ...... ~..%llr..~.ll
~-~' ~ i-~ .-~--? ~ :i ~ - ' - i I i I- ~--~ ~-~..~...-..i..-~...i...! ..... i..~...i...~ .... i.. i...i...i ...... L.i.&4.. :.4..
Iii{ Iii{ i,,-- ,,
I ~ ~ ~, ! ! i { i iii'~T-?'~iii iiii i iI
. ~ ~ ! i ~ ~ ~ ~ ! ! -~ 4 ~ i ...... ~.4..L.i- ..i...i-~...i .... i..~..~..i ...... i..i..-~...~
i , i ~ ~ ' ~ ~ I i i i i l'ti { { i i i I i j i {li { --~t. ~ 1,:,:z'~-+ .... +..4..~.~..:: . : ..4..4...;..4-:;:: ..~...~...i...~=:;; ...... i...;.-i..i=,,,l===,i...;
i~, { 'iii~{ili, ~ ~,~n~ ~, ~ ~ ~{ ~t ~ ~---~,.--~ ........ ~-+.* ...... +.+.+...+..~.-~-.-~...,-..~ ...... *.+-?.-~T,.~-.--~-..~...
149.
PROJECTION ON VERTICRL. PLANE 149. - 329. SCALED IN VERTICAL D(EPTHS HORIZ SCALE = I/I000 IN/FT
TELE£O
Teleco Oilfield S6
611 6 Nielson Way
Anchorage, AK
99502
(907) 562-2646
~s of Alaska Inc.
November 15, 1990
JOB #782
BP EXPLORATION (ALASKA) INC.
WELL: P-19
NORTH SLOPE/PRUDHOE BAY
UDi 4,
ORIGINAL
Attached please find a copy of the computer calculated MWD
directional surveys for the above mentioned well.
Teleco appreciates this opportunity to provide service to BP
Exploration (Alaska) Inc.
Teleco is committed to providing the highest quality MWD Service
and we would welcome any comments or questions concerning these
surveys or any of our other services.
Sincerely,
Jonathan G. Mapes
Field Operations Supervisor
JGM/el
Enclosures
Alaska 0il & Gas Cons. C~mrnissio~]
;~,rlchorago,
A .~..,,id~"l' COMPANY
TELECO OILFIELD SERVICES
SURVEY CALCULATIONS
Date 10/22/90
Company: BP Exploration
Well: P-19
Location: North Slope/Prudhoe Bay
Rig: AUDI 2
TELECO Job # 782TAK
Grid Correction: 0.0°
Magnetic Declination: 30.0°
Total grid correction: 30.0°
Proposed Direction: 145.9°
MINIMUM CURVATURE CALCULATION
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl /Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
Tie-in to magnetic single shots
496 0 0.8 55.0 '496.00 -0.05 1.86N 2'.66E 3.25 N 55.04E 0.00
995 499 0.5 122.0 994.98 1.89 2.58N 7.18E 7.63 N 70.25E 0.14
1495 500 0.8 260.0 1494.96 2.55 0.85N 5.81E 5.87 N 81.63E 0.23
1993 498 0.8 95.0 1992.95 3.27 0.00N 5.85E 5.85 N 89.96E 0.30
2490 497 0.3 150.0 2489.93 6.41 1.22S 9.63E 9.71 S 82.79E 0.13
PAGE 1
Company: BP E×ploration, Well: P-19, Location: North Slope/Prudhoe Bay, Riq: AUDI 2
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
Teleco MWD surveys
2951 461 0.8 97.9 2950.91 9.56 2.53S 13.32E 13.56 S 79.24E 0.15
3422 471 0.7 63.0 3421.87 12.12 1.68S 19.14E 19.21 S 84.99E 0.10
3922 500 0.3 148.1 3921.86 13.80 1.40S 22.55E 22.60 S 86.44E 0.15
3976 54 0.9 153.0 3975.85 14.37 1.90S 22.82E 22.90 S 85.24E 1.11
4071 95 4.0 148.5 4070.75 18.42 5.40S 24.89E 25.47 S 77.76E 3.28
4165 94 5.6 159.0 4164.42 26.18 12.48S 28.26E 30.89 S 66.16E 1.93
4259 94 8.6 148.1 4257.70 37.67 22.74S 33.6].E 40.58 S 55.93E 3.49
4353 94 11.4 147.8 4350.26 53.98 36.57S 42.28E 55.90 S 49.14E 2.98
4448 95 14.8 143.9 4442.77 75.50 54.32S 54.44E 76.90 S 45.06E 3.70
4542 94 18.0 142.1 4532.94 102.00 75.49S 70.44E 103.25 S 43.02E 3.46
4635 93 22.3 139.7 4620.22 133.90 100.31S 90.69E 135.23 S 42.12E 4.70
4743 108 25.3 139.3 4719.03 177.21 133.44S l19.00E 178.79 S 41.73E 2.78
4837 94 27.9 139.0 4803.07 219.00 165.27S 146.53E 220.88 S 41.56E 2.77
4937 100 30.4 137.9 4890.40 267.29 201.71S 178.85E 269.58 S 41.56E 2.56
PAGE 2
Company: .BP Exploration, Well: P-19, Location: North Slope/Prudhoe Bay, Riq: AUDI 2
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
5032 95 32.3 137.6 4971.53 316.21 238.29S 212.08E 319.00 S 41.67E 2.01
5125 93. 34.5 136.2 5049.16 366.77 275.66S 247.07E 370.17 S 41.87E 2.51
5218 93 35.4 136.2 5125.39 419.28 314.11S 283.94E 423.42 S 42.11E 0.97
5309 91 35.4 135.8 5199.57 471.21 352.03S 320.56E 476.11 S 42.32E 0.25
5409 100 35.3 134.1 5281.13 528.00 392.90S 361.50E 533.91 S 42.62E 0.99
5503 94 35.4 133.7 5357.80 581.20 430.61S 400~69E 588.20 S 42.94E 0.27
5604 101 35.4 134.8 5440.13 638.50 471.44S 442.60E 646.64 S 43.19E 0.63
5688 84 35.7 134.8 5508.47 686.42 505.85S 477.25E 695.45 S 43.33E 0.36
5776 88 35.9 134.4 5579.85 736.90 541.99S 513.90E 746.90 S 43.48E 0.35
5870 94 35.8 133.7 5656.04 790.77 580.27S 553.47E 801.90 S 43.65E 0.45
5964 94 35.6 133.0 5732.38 844.31 617.93S 593.35E 856.68 S 43.84E 0.48
6065 101 34.9 132.0 5814.86 901.02 657.32S 636.32E 914.86 S 44.07E 0.90
6159 94 34.5 132.0 5892.14 952.96 693.13S 676.08E 968.25 S 44.29E 0.43
PAGE 3
Company: BP Exploration, Well: P-19, Location: North Slope/Prudhoe Bay, Riq: AUDI 2
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
6253 94 34.1 132.7 5969.79 1004.46 728.82S 715.23E 1021.14 S 44.46E 0.59
6347 94 3.3.7 132.7 6047.81 1055.50 7.64.37S 753.76E 1073.51 S 44.60E 0.43
6441 94 33.0 133.4 6126.33 1105.88 799.65S 791.53E 1125.15 S 44.71E 0.84
6528 87 32.4 133.4 6199.53 1151.77 831.95S 825.68E 1172.13 S 44.78E 0.70
6622 94 32.2 133.7 6278.99 1200.84 866.56S 862.09E 1222.34 S 44.85E 0.27
6715 93 31.3 134.4 6358.07 1248.73 900.58S 897.26E 1271.27 S 44.89E 1.05
6815 100 31.2 135.8 6443.56 1299.68 937.32S 933.88E 1323.14 S 44.89E 0.73
6908 93 30.8 135.8 6523.28 1346.84 971.66S 967.27E 1371.04 S 44.87E 0.43
7000 92 30.7 136.9 6602.35 1393.22 1005.69S 999.74E 1418.06 S 44.83E 0.62
7093 93 30.4 139.7 6682.44 1440.06 1040.98S 1031.18E 1465.25 S 44.73E 1.56
7187 94 30.3 141.4 6763.56 1487.35 1077.65S 1061.36E 1512.55 S 44.56E 0.92
7281 94 29.9 142.1 6844.88 1534.37 1114.67S 1090.54E 1559.41 S 44.37E 0.57
7374 93 29.2 144.3 6925.79 1580.17 1151.38S 1118.02E 1604.89 S 44.16E 1.39
PAGE 4
Company: BP Exploration, Well: P-.19, Location: North Slope/Prudhoe Bay, .Riq: AUDI 2
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
7455 81 28.9 145.7 6996.60 1619.50 1183.60S 1140.58E 1643.73 S 43.94E 0.92
7547 92 31.0 145.0 7076.30 1665.43 1221.38S 1166.70E 1689.07 S 43.69E 2.32
7642 95 34.1 145.7 7156.37 1716.54 1263.44S 1195.75E 1739.57 S 43.42E 3.28
7736 94 34.3 145.7 7234.11 1769.38 1307.09S 1225.52E 1791.76 S 43.16E 0.21
7830 94 33.4 146.7 7312.18 1821.73 1350.59S 1254.66E 1843.44 S 42.89E 1.13
7925 95 35.1 148.1 7390.71 1875.18 1395.64S 1283.45E 1896.06 S 42.60E 1.97
8019 94 36.7 148.5 7466.85 1930.24 1442.54S 1312.41E 1950.21 S 42.30E 1.72
8114 95 36.4 150.2 7543.17 1986.71 1491.20S 1341.25E 2005.65 S 41.97E 1.11
8209 95 36.2 149.2 7619.73 2042.83 1539.76S 1369.62E 2060.76 S 41.65E 0.66
8311 102 36.8 150.2 7701.72 2103.37 1592.14S 1400.23E 2120.27 S 41.33E 0.83
8405 94 38.0 153.0 7776.40 2160.17 1642.37S 1427.36E 2175.94 S 40.99E 2.23
8499 94 39.0 152.3 7849.95 2218.29 1694.36S 1454.25E 2232.86 S 40.64E 1.16
8599 100 40.3 154.8 7926.95 2281.53 1751.49S 1482.65E 2294.77 S 40.25E 2.05
PAGE 5
Company: BP Exploration., Well: P-19, Location: North Slope/Prudhoe Bay, Riq: AUDI 2
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
8681 82 41.6 154.1 7988.88 2334.67 1799.97S 1505.83E 2346.79 S 39.92E 1.68
8781 100 42.6 155.2 8063.08 2400.93 1860.56S 1534.53E 2411.73 S 39.51E 1.24
8875 94 42.7 154.5 8132.21 2463.84 1918.21S 1561.59E 2473.48 S 39.15E 0.52
8974 99 42.4 157.3 8205.15 2529.76 1979.31S 1588.93E 2538.18 S 38.76E 1.94
9068 94 41.6 159.7 8275.01 2591.14 2037.81S 1611.99E 2598.30 S 38.35E 1.91
9161 93 40.5 162.5 8345.15 2650.07 2095.58S 1631.78E 2655.96 S 37.91E 2.30
9255 94 38.9 163.9 8417.47 2707.40 2153.05S 1649.15E 2712.07 S 37.45E 1.95
9343 88 38.1 167.8 8486.35 2758.88 2206.14S 1662.55E 2762.45 S 37.00E 2.90
9437 94 38.4 168.2 8560.17 2812.81 2263.06S 1674.65E 2815.30 S 36.50E 0.41
9531 94 38.4 172.0 8633.85 2866.04 2320.56S 1684.68E 2867.60 S 35.98E 2.52
9625 94 38.7 173.8 8707.37 2918.23 2378.69S 1691.91E 2919.02 S 35.42E 1.23
9700 75 38.7 177.0 8765.91 2959.04 2425.42S 1695.66E 2959.38 S 34.96E 2.68
PAGE 6
TEL,-'CO 0 ~ 1 f i e 1 d
PLAN VIE~
Services
400
BP Exploration
P-19
~X~9s ' North Slope/Prudhoe
~x,~.ss5 ' AUDI 2
'~,x,4937 ' JOB# 782TAK/O0
x~x 521a ' SCALE:
~os ' 1 inch = 400 feet
8~14 '
83~ '
8499
~0~ '
~ ~700
~ 9437 '
Bay
4OO
800
1200 aa
CD
I
600 ~
2OOO
2400
2800
3200
0 400 800 1200 1600 2000
EAST(ft)
2400
-~000
TEL~JO Oi 1 f ie ld Serv ~ ces
VERT I CAL PROJECTION
lO00 2000 3000 4000 5000
1000
20OO
~3000
~4'000
>5000
6OOO
7OO0
BO00
9OO0
496 ' .75 cleg
995 ' .5 deg
1495 ' .75 cleg
~993 ' .75 deg
BP Exploration
P-19
North S]ope/Prudhoe Bay
AUDI 2
JOB# 782TAK/O0
SCALE:
~ inch = lO00 feet
2490 ' .25 deg
295~ ' .8 cleg
3422 ' .7 deg
3922 ' .3 deg
4~65 ' 5.6 deg
4448 ' ~4.8 deg
ff~4743 ' 25.3 deg
-f~5032 ' 32.3 deg
-~5309. ' 35.4 Oeg
-~5604 ' 35.4 deg
-~5870 ' 35.8 deg
-k~6159 ' 34.5 aeg
-~6441 ' 33.01 deg
-~67i5 ' 31.3 deg
-~7000 ' 30.7 deg
-~728~ ' 29.9 deg
-~7547 ' 31.01 deg
-~7830 ' 33.4 deg
~x,~81~4 ' 36.4 deg
kxX,8405 ' 38.01 deg
--~681 ' 41.6 deg
~x,x,8974 ' 42.4 deg
-~9255 ' 38.9 deg
VERTICAL SECTION (ft)
GREAT LAND DIRECTIONAL DRILLING, INC.
REPORT OF SUB-SURFACE DIRECTIONAL SURVEY
BP EXPLORTION
COMPANY
0 .......
LOCATION
AL1090D34 MWD 10/19/90
JOB NUMBER
LYNN HENSLEY
TYPE SURVEY
DIRECTIONAL
SUPERVISOR
DATE
NAME TITLE SIGNATURE
496 FT. 9776 FT.
DEPTH INTERVAL
FROM TO
10/09/90 10/19/90
DATE SURVEY TAKEN
FROM TO
THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE
HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES
FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL
COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON
WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE
AND ARE HELD IN STRICTEST CONFIDENCE.
GREAT LAND
Client .... :
Field ..... :
Well ...... :
Section at:
Engineer..:
DIRECTIONAL DRILLING,
BP EXPLORATION
PRUDHOE BAY
PRUDHOE BAY P-19
S,34.09,E
LYNN HENSLEY
INC.
S MEAS INCLN
C DEPTH ANGLE
3 496 0.75
3 995 0.50
3 1495 0.75
3 1993 0.75
3 2490 0.25
3 2951 0.80
3 3422 0.70
3 3922 0.30
3 3976 0.90
3 4071 4.00
3 4165 5.60
3 4259 8.60
3 4353 11.40
3 4448 14.80
3 4542 18.00
3 4635 22.30
3 4743 25.30
3 4837 27.90
3 4937 30.40
3 5032 32.30
3 5125 34.50
VERTICAL-DEPTHS
BKB SUB-SEA
496.0 404.1
995.0 903.1
1494.9 1403.0
1992.9 1901.0
2489.9 2398.0
2950.8 2858.9
3421.8 3329.9
3921.8 3829.9
3975.8 3883.9
4070.7 3978.8
SECTION
DISTNCE
-1.5
1.3
4.3
8.1
11.9
15.7
18.2
21.3
21.8
25.9
4164.3 4072.4 33.6
4257.6 4165.7 45.1
4350.2 4258.3 61.4
4442.7 4350.8 83.0
4532.9 4441.0 109.5
4620.1 4528.2 141.4
4718.9 4627.0 184.7
4803.0 4711.1 226.5
4890.3 4798.4 274.8
4971.4 4879.5 323.7
5049.1 4957.2 374.3
10/23/90
RECORD OF SURVEY
Computation...:
Survey Date...:
RKB Elevation.:
Reference ..... :
Ragnetic Dcln.:
RADIUS OF CURVATURE
10/19/90
91.90 ft
30.00 E
DIRECTION
BEARING
N 55.00 E
S 58.00 E
S 80.00 W
S 85.00 E
S 30.00 E
S 82.10 E
N 63.00 E
S 31.90 E
S 27.00'E
S 31.50 E
S 21.00 E
S 31.90 E
S 32.20 E
S 36.10 E
S 37.90 E
S 40.30 E
S 40.70 E
S 41.00 E
S 42.10 E
S 42.40 E
S 43.80 E
RELATIVE-COORDINATES CLOSURE
FROM-WELL-HEAD DISTNCE BEARING
DL
/lO0
2.8 N 1.4 E 3.1 N 27.50 E 0.15
2.9 N 6.6 E 7.2 N 66.18 E 0.05
1.2 S 5.8 E 5.9 S 77.82 E 0.05
5.7 S 6.0 E 8.3 S 46.16 E 0.01
8.0 S 9.5 E 12.4 S 49.96 E 0.10
10.3 S 12.9 E 16.5 S 51.47 E 0.12
9.2 S 18.9 E 21.0 S 63.89 E 0.02
10.3 S 22.7 E 24.9 S 65.56 E 0.08
10.8 S 23,0 E 25.4 S 64,81 E 1,11
14.3 S 24.9 E 28.8 S 60.10 E 3.26
21.4 S 28.4 E 35~6 S 53.04 E 1.71
31.8 S 33.6 E 46.2 S 46.59 E 3.20
45.6 S 42.2 E 62.2 S 42.81 E 2.98
63.4 S 54.3 E 83.5 S 40.59 E 3.59
84.6 S 70.3 E 110.0 S 39.72 E 3.41
109.5 S 90.5 E 142.0 S 39.58 E 4.64
142.6 S 118.8 E 185.6 S 39.80 E 2.78
174.4 S 146.3 E. ~ 227.7 S 39.99 E 2.77
210.9 S '178.6 E 276.4 S 40.27 E 2.52
247.5 S 211.9 E 325.8 S 40.57 E 2.00
284.8 S 246.8 E 376.9 S 40.91 E 2.41
Survey Codes: 3/MWD
PRUDHOE BAY P-19
S MEAS
C DEPTH
3 5218
3 5309
3 5409
3 5503
3 5604
3 5688
3 5776
3 5870
3 5964
3 6065
3 6159
3 6253
3 6347
3 6441
3 6528
3 6622
3 6715
3 6815
3 6908
3 7000
3 7093
3 7187
3 7281
3 7374
3 7455
INCLN
ANGLE
35.40
35.40
35.30
35.40
35.40
35.70
35.90
35.80
35.60
34.90
34.50
34.10
33.70
33.00
32.40
32.20
31.30
31.20
30.80
30.70
30.40
30.30
29.90
29.20
28.90
VERTICAL-DEPTHS
BKB SUB-SEA
SECTION
DISTNCE
5125.3 5033.4 426.8
5199.5 5107.6 478.8
5281.0 5189.1 535.6
5357.7 5265.8 588.8
5440.0 5348.1 646.1
5508.4 5416.5 694.0
5579.8 5487.9 744.5
5656.0 5564.1 798.4
5732.3 5640.4 851.9
5814.8 5722.9 908.6
5892.1 5800.2 960.5
5969.7 5877.8 1012.0
6047.7 5955.8 1063.1
6126.2 6034.3 1113.5
6199.5 6107.6 1159.3
6278.9 6187.0 1208.4
6358.0 6266.1 1256.3
6443.5 6351.6 1307.3
6523.2 6431.3 1354.4
6602.3 6510.4 1400.8
RECORD OF SURVEY
6682.4 6590.5 1447.6
6763.5 6671.6 1494.9
6844.8 6752.9 1541.9
6925.7 6833.8 1587.8
6996.5 6904.6 1627.1
DIRECTION
BEARING
S 43.20 E
S 44.20 E
S 45.90 E
S 46.30 E
S 45.20 E
S 45.20 E
S 45.60 E
S 46.30 E
S 47.00 E
S 48.00 E
RELAT I V E- COORD I NATES
FROM-WELL-HEAD
323.5 S 283.5 E
361.6 S 319.9 E
402.5 S 360.9 E
440.2 S 400.1 E
481.0 S 442.0 E
515.4 S 476.6 E
551,6 S 513.3 E
589.8 S 552.8 E
627.5 S 592.7 E
666.9 S 635.7 E
S 48.00 E 702.7 S 675.5 E
S 47.30 E 738.4 S 714.6 E
S 47.30 E 773.9 S 753.2 E
S 46.60 E 809.2 S 790,9 E
S 46.60 E 841.5 S 825.1 E
S 46.30 E
S 45.60 E
S 44.20 E
S 44.20 E.
S 43.10 E
Page 2
CLOSURE
DISTNCE BEARING
430.1 S 41.23 E
482.8 S 41.50 E
540.6 S 41.88 E
594.8 S 42.27 E
653.2 S 42.58 E
10/23/90
DL
/lOO
0.99
0.37
0.58
0.18
0.37
702.0 S 42.76 E 0.36
753.4 S 42.94 E 0.28
808.4 S 43.15 E 0.28
863.2 S 43.37 E 0.33
921.3 S 43.63 E 0.77
974.7 S 43.87 E
1027.6 S 44.06 E
1079.9 S 44.2.2 E
113115 S 44.35 E
1178.5 S 44.44 E
876.1S 861.5 E 1228.7 S 44.52 E
910.1S 896.6 E 1277.6 S 44.57 E
946.9 S 933.3 E 1329.5 S 44.59 E
981,2 S 966.7 E 1377.4 S 44.57 E
1015.2 S 999.1 E 1424.4 S 44.54 E
S 40.30 E 1050.5 S 1030.6 E 1471.6 S 44.45 E
S 38.60 E 1087.2 S 1060.7 E 151910 S 44.29 E
S 37.90 E 1124.2 S 1089.9 E 1565.8 S 44.11 E
S 35,70 E 1161.0 S 1117.4 E 1611.3 S 43.90 E
S 34.30 E 1193.2 S 1140.0 E 1650.2 S 43.69 E
0.43
.0.49
0.43
0.78
0.69
0.23
0.99
0.39
0.43
0.33
0.84
0.47
0.46
0.94
0.55
3 7547 31.00 7076.2 6984.3 1673.0 S 35.00 E 1231.0 S 1166.1 E 1695.6 S 43.45 E 2.29
PRUDHOE BAY P-19
S MEAS INCLN
C DEPTH ANGLE
3 7642 34,10
3 7736 34,'30
3 7830 33,40
3 7925 35,10
3 8019 36,70
VERTICAL-DEPTHS
BKB SUB-SEA
SECTION
DISTNCE
7156.3 7064,4 1724.1
7234,0 7142,1 1776,9
7312,1 7220,2 1829,3
7390,6 7298,7 1882,8
7466,8 7374,9 1937,8
3 8114 36.40 7543,1 7451,2
3 8209 36,20 7619,6 7527,7
3 8311 36,80 7701,6 7609,7
3 8405 38,00 7776,3 7684,4
3 8499 39,00 7849,9 7758,0
3 8599 40,30 7926,9 7835,0
3 8681 41.60 7988,8 7896,9
3 8781 42,60 8063,0 7971,1
3 8875 42,70 8132,1 8040,2
3 8974 42,40 8205,1 8113.2
3 9068 41,60 8274,9 8183,0
3 9161 40,50 8345,1 8253,2
3 9255 38,90 8417,4 8325,5
3 9343 38,10 8486,2 8394,3
3 9437 38,40 8560,1 8468,2
RECORD OF SURVEY
3 9531 38,40 8633,7 8541,8
3 9625 38,70 8707,2 8615,3
3 9700 38.70 8765.8 8673,9
X 9776 38,70 8825,1 8733,2
1994,3
2050,3
2110,8
2167,6
2225,7
2288,9
2342,1
2408,4
2471,3
2537.2
2598,6
2657,5
2714,8
2766,3
2820,2
DIRECTION
BEARING
RELATIVE-COORDINATES
FROM-WELL-HEAD
Page 3
CLOSURE
DISTNCE BEARING
S 34,30 E 1273.0 S 1195.1 E 1746,1 S 43,19 E
S 34,30 E .1316,6 S 1224,9 E 1798,3 S 42,93 E
S 33,30 E 1360,2 S 1254,0 E 1850,0 S 42,68 E
S 31,90 E 1405,2 S 1282,8 E 1902,7 S 42,39 E
S 31,50 E 1452,1 S 1311,8 E 1956,9 S 42,09 E
S 29,80 E
S 28,80 E
S 29,80 E
S 27.00 E
S 27,70 E
1500,8 S 1340,6 E 2012,4 S 41,77 E
1549,8 S 1368,2 E 2067,3 S 41,44 E
1602,7 S 1397,9 E 2126,7 S 41,09 E
1652,9 S 1425,0 E 2182,4 S 40,76 E
1704,9 S 1451,9 E 2239,4 S 40,42 E
S 25,20 E 1762,0 S 1480,3 E 2301,3 S 40,03 E
S 25,90 E 1810,5 S 1503,5 E 2353,4 S 39,71 E
S 24,80 E 1871,1 S : 1532,2 E 2418,4 S 39,31 E
S 25,50 E 1928,8 S 1559,3 E 2480,2 S 38,95 E
S 22,70 E 1989,9 S 1586,6 E 2545,0 S 38,57 E
2048,4 S 1609,6 E
2106,1 S 1629,4 E
2163,6 S 1646,8 E
2216,7 S 1660,2 E
2273,7 S 1672,3 E
10/23/90
S 20,30 E
S 17.50 E
S 16,10 E
S 12,20 E
S 11,80 E
DL
/lOO
2873,5 S 8,00 E
2925,7 S 6,20 E
2966.5 S 3.00 E
3007,2 S 3,00 E
3,27
0,21
1,01
1,85
1,71
0.70
0,42
0,69
1,70
1,10
1,67
1,63
1,12
0,36
1,32
2605,1 S 38,16 E 1,41
2662,9 S 37,73 E 1,74
2719,0 S 37,28 E 1,80
2769,5 S 36,83 E 1,92
2822,4 S 36,33 E 0,36
2331,2 S 1682,3 E 2874,8 S 35,82 E 1,56
2389,3 S 1689,5 E 2926,3 S 35,27 E 0,81
2436,0 S 1693,3 E 2966,7 S 34.80 E 1,67
2483,5 S 1695,8 E 3007,2 S 34,33 E 0,00
ASurvey Codes: 3/MWD X/EXTRAPOLATED
PRUDHOE BAY P-19
DATA INTERPOLATED FOR 100
Page
FT SUBSEA INTERVAL
4 10/23/90
SUBSEA MEAS
DEPTH DEPTH
500 592
600 692
700 792
800 892
900 992
INCLN TVD MD-TVD VERT
ANGLE BKB DIFF CRRT
0.70 592 0
0.65 692 0
0.60 792 0
0.55 892 0
0.50 992 0
1000 1092 0.55 1092
1100 1192 0.60 1192
1200 1292 0.65 1292
1300 1392 0.70 1392
1400 1492 0.75 1492
1500 1592 0.75 1592
1600 1692 0.75 1692
1700 1792 0.75 1792
1800 1892 0.75 1892
1900 1992 0.75 1992
2000 2092 0.65 2092
2100 2192 0.55 2192
2200 2292 0.45 2292
2300 2392 0.35 2392
2400 2492 0.25 2492
2500 2592 0.37 2592
2600 2692 0.49 2692
2700 2792 0.61 2792
2800 2892 0.73 2892
2900 2992 0.79 2992
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
DIRECTION
BEARING
0 S 1.32 E
0 S 60.04 E
0 N 61.23 E
0 N 2.51 E
0 N 56.21 W
S 31.24 E
S 3.64 E
S 23.96 W
S 51.56 W
S 79.16 W
RELATIVE COORDINATES
FROM WELL HEAD
2.32 N 2.33 E
2.87 N 3.71 E
4.61 N 4.40 E
6.58 N 3.53 E
7.38 N 1.39 E
2.28 N 7.20 E
1.34 N 7.51 E
0.30 N 7.38 E
0.64 S 6.78 E
1.23 S 5.81 E
S 47.87 W 1.80 S 4.65 E'
S 14.73 W 2.90 S 3.98 E
S 18.40 E 4.19 S 4.02 E
S 51.54 E 5.25 S '4.76 E
S 84.67 E 5.73 S 5.95 E
S 74.04 E 5.95 S 7.16 E
S 62.97 E 6.35 S 8.12 E
S 51.91 E 6.86 S 8.84 E
S 40.84 E 7.43 S 9.29 E
S 30.23 E 7.98 S 9.49 E
S 41.53 E
S 52.83 E
S 64.14 E
S 75.44 E
N 53.76 W
8.42 S 9.81 E
8.95 S 10.35 E
9.49 S 11.12 E
10.00 S 12.15 E
9.87 S 13.03 E
3000 3092 0.77 3092 0 0 N 15.27 E 9.28 S 14.35 E
PRUDHOE BAY P-19
Page 5
DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL
10/23/90
SUBSEA MEAS INCLN
DEPTH DEPTH ANGLE
TVD
BKB
3100 3192 0,75 3192
3200 3292 0,73 3292
3300 3392 0,71 3392
3400 3492 0,64 3492
3500 3592 0,56 3~592
3600 3692 0,48 3692
3700 3792 0.40 3792
3800 3892 0,32 3892
3900 3992 1,43 3992
4000 4092 4.36 4092
4100 4193 6,48 4192
4200 4294 9,63 4292
4300 4396 12,93 4392
4400 4499 16,54 4492
4500 4605 20,90 4592
4600 4713 24,47 4692
4700 4824 27,55 4792
4800 4939 30.44 4892
4900 5056 32,87 4992
5000 5177 35,00 5092
5100 5300 35,40 5192
5200 5422 35,31 5292
5300 5545 35.40 5392
5400 5668 35,63 5492
5500 5791 35,88 5592
MD-TVD VERT DIRECTION RELATIVE COORDINATES
DIFF CRRT BEARING FROM WELL HEAD
0 0 N 84,30 E 10,31 S 16,12 E
0 0 S 26,67 E 12,80 S 16,42 E
0 0 S 42,36 W 14,69 S 14,48 E
0 0 S 24,46 W 9,68 S 19,31 E
0 0 S 30,53 E 9,72 S 20,49 E
0 0 S 85.51 E 8.71 S 21.56 E
0 0 N 39,51 E 7,03 S 21,62 E
0 0 N 15,47 W 5,69 S 20,42 E
0 0 S 27,76 E 11,09 S 23,11 E
0 0 S 29,12 E 15,68 S 25,73 E
1 0 S 24,21 E 24,08 S 29,54 E
2 1 S 32,01 E 36,44 S 36.50 E
4 2 S 33,95 E 53,14 S 47,16 E
7 3 S 37,08 E 74,50 S 62,56 E
13 6 S 39,52 E 100,88 S 83,34 E
21 9 S 40,59 E 133,08 S 110,63 E
33 11 S 40,96 E 170,04 S 142,51 E
47 14 S 42,11 E 211,58 S 179,26 E
64 17 S 42,77 E 257,10 S 220,71 E
85 21 S 43,46 E 306,35 S 267,34 E
108 23 S 44,10 E 357,74 S 316,18 E
130 23 S 45,96 E 407,82 S 366,40 E
153 23 S 45,84 E 457.04 S 417,56 E
176 23 S 45,20 E 507,09 .S 468,23 E
199 23 S 45,71 E 557,71 S 519,56 E
5600 5914 35,71 5692 222 23 S 46,63 E 607,67 S 571,61 E
PRUDHOE BAY P-19
Page
DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL
6 10/23/90
SUBSEA MEAS
DEPTH DEPTH
5700 6037
5800 6159
5900 6280
6000 6400
6100 6519
6200 6637
6300 6755
6400 6872
6500 6988
6600 7104
INCLN TVD MD-TVD VERT DIRECTION
ANGLE BKB DIFF CRRT BEARING
35.09 5792 245 23 S'47.72 E
34.50 5892 267 22 S 48.00 E
33.99 5992 288 21 S 47.30 E .
33.31 6092 308 20 S 46.91 E
32.46 6192 327 19 S 46.60 E
RELATIVE COORDINATES
FROM WELL HEAD
656.14 S 623.84 E
702.62 S 675.40 E
748.54 S 725.65 E
793.83 S 774.58 E
838.20 S 821.58 E
32.05 6292 345 18 S 46.18 E 881.74 S 867.36 E
31.26 6392 363 17 S 45.04 E 924.61 S 911.29 E
30.96 6492 380 17 S 44.20 E 967.80 S 953.61 E
30.71 6592 396 16 S 43.24 E 1010.76 S 994.91 E
30.39 6692 412 16 S 40.10 E 1054.82 S 1034.18 E
6700 7220
6800 7335
6900 7450
7000 7565
7100 7685
30.16 6792 428 16 S 38.36 E 1100.18 S 1071.05 E
29.49 6892 443 15 S 36.62 E 1145.61 S 1106.19 E
28.92 6992 458 15 S 34.39 E 1191.07 S 1138.53 E
31.60 7092 473 16 S 34.86 E 1238.77 S 1171.53 E
34.19 7192 493 20 S 34.30 E 1292.95 S 1208.74 E
7200 7806
7300 7927
7400 8050
7500 8175
7600 8299
33.63 7292 514 21 S 33.56 E 1348.99 S 1246.67 E
35.13 7392 535 21 S 31.89 E 1405.96 S 1283.31 E
36.60 7492 558 24 S 30.94 E 1468.09 S 1321.49 E
36.27 7592 583 24 S 29.16 E ~ 1532.02 S 1358.31 E
36.73 7692 607 24 S 29.68 E 1596.40 S 1394.25 E
7700 8425
7800 8553
7900 8685
8000 8820
8100 8956
38.21 7792 633 26 S 27.15 E 1663.82 S 1430.57 E
39.71 7892 661 29 S 26.34 E 1735.61 S 1467.55 E
41.64 7992 693 32 S 25.85 E 1812.99 S 1504.69 E
42.64 8092 728 35 S 25.09 E 1895.22 S 1543.41 E
42.45 8192 764 36 S 23.20 E 1978.77 S 1581.90 E
8200 9091 41.33 8292 799 34 S 19.62 E 2062.47 S 1614.76 E
PRUDHOE BAY P-19
Page 7
DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL
10/23/90
SUBSEA MEAS INCLN
DEPTH DEPTH ANGLE
TVD
BKB
8300 9222 39.46 8392
8400 9350 38.12 8492
8500 9478 38.40 8592
8600 9605 38.64 8692
8700 9733 38.70 8792
MD-TVD VERT DIRECTION RELATIVE COORDINATES
DIFF CRRT BEARING FROM WELL HEAD
830 31 S 16.59 E 2143.70 S 1640.94 E
858 28 S 12.17 E 2221.07 S 1661.10 E
886 27 S 10.16 E 2298.43 S 1677.07 E
913 28 S 6.58 E 2377.09 S 1688.18 E
942 28 S 3.00 E 2456.93 S 1694.40 E
PRUDHOE BAY P-19 Page 8
DATA INTERPOLATED FOR 1000 FT MEASURED DEPTH INTERVAL
10/23/90
MEAS INCLN VERT-DEPTHS SECT DIRECTION REL-COORDINATES CLOSURE' DL/
DEPTH ANGLE BKB SUB-S DIST BEARING FROM-WELLHEAD DIST BEARING. 100
1000 0.50. 1000 908
2000 0.74 2000 1908
3000 0.79 3000 2908
4000 1.68 4000 3908
5000 31.66 4944 4852
1 S 56.62 E 3 N 7 E
8 S 84.23 E 6 S 6 E
15 N 48.28 W 10 S 13 E
22 S 28.14 E 11 S 23 E
307 S 42.30 E 235 S 200 E
7 N 66.47 E 0.1
8 S 46.55 E 0.1
16 S 53.20 E 0.1
26 S 64.08 E 3.3
309 S 40.47 E 2.0
6000 35.35 5762 5670 872 S 47.36 E 642
7000 30.70 6602 6510 1401 S 43.10 E 1015
8000 36.38 7451 7360 1927 S 31.58 E 1442
9000 42.18 8224 8132 2554 S 22.04 E 2006
608 E 884 S 43.46 E 0.8
999 E 1424 S 44.54 E 0.3
1306 E 1946 S 42.16 E 1.7
1593 E 2562 S 38.46 E 1.4
Spast L end Directional O~illing. £nc.
<KB>O A
500 ~ .
i
t000 ~
t500 ~
2000 ------
2500 ,
3000
3500
4000
T 45oo
V
D ~ooo
5500
6000
6500
7000
- 7500
BO00
850O
9000
500
VEBTICAL SECTION VIEW
BP EXPLORATION
FRUOHOE BAY P-i9
Section at: S 34.09 E
TVD Scale.: ~ inch = I000 feet
Dep Scale.: i inch = iO00 feet
Drawn .....: 10/23/§0
Marker Identification MD TVD SECTN INCLN
A) KB 0 0 0 0.00
B) TD 9776 8825 3007 38.70
I
500
iO00
i500 2000 2500 3000 3500 4000 4500 5000
Section Departure
14arker Identification MD N/S F/il
A) KB 0 0 N 0 E
B) TD 9776 2483 S t696 E
PLAN VIEW
BP EXPLORATION
PRUDHOE BAY F-19
CLOSURE ..... : 3007 ft S 34.33 E
DECLINATION.: 30.00 E
i SCALE · ~ inch = 400 feet
~DRAHN.' ...... :
'' 0
'~ aoo
400
800
~000
i~O0
i400
i§O0
iBO0
-- ~000
2200
~400
2§00
200
I
0 200 400
<- ~EST · EAST ->
800 800 t000 t200 t400' t600 t800 2000 2200
PERMIT # ~ b
COMPLETION DATE
AOGCC GEOLOGICAL MATERIALS ]NVENTO~Z LiST
/$
WELL NAME ,~,i~ ~
/
/~ ~ ~ / ~o CO. CONTACT
check off or list data as it is received.*list received date for 407. if not reo, uircd list as NR
4§7 l*.3//¢/~/ drillina histo,-v I ~'1 surveyL~ J well tests ~ core dcscriptio~
cored in{e~ais
core analysis
dry, ditch intervals
digital data
~' ?..~
i . ,~o"~,.,n= i RUN i iINlklTC'ntiilO,--n,~,LO 1 SCALE
i ~" '' ~ ! HO. [to thc nearest foot] [inchtl
I "
' ~ ' ' ' ....... ~'" ! ' ' ' ' .... J ...... ' '-'
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: ARCO Date:l 1/05/90
CHEVRON T#:81 626
EXXON
MOBIL
PHILLIPS
STATE OF ALASKA
TEXACO
GEOSCIENCE
ARCHIVES
BP OPEN HOLE FINAL
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
! P-19 DIL/SFL 10/22/90 #1 9764-10356 HLS 2"/5"
"P-19 DSN 10/22/90 #1 10058-10247 HLS 2"/5"
~ P-19 BHCS 10/22/90 #1 9764-10334 HLS 2"/5"
--P-19 HRi/DFL 10/24/90 #1 10058-10292 HLS 2"/5"
'" P-19 DSN2 10/22/90 #1 HLS 2"/5
',D-19 HR!/DFL I r~oo:~n,,,, ,- .... #1 HLS 2"/"
*** GEOS/ARCO/EXXON/ARCH IVES ONLY.
STATE ONLY:
Magnetic Single Shot Directional Survey
Gyroscopic Directional
Date:
Date:
Job#:
Job#:
Inforation Control
Well Records LR 2-1
J.. Dietz/S. McCurry
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P,O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :02/20/91
T#:82117
FROM'
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
%P-14
% P-14
,,~-S-22
S-22
~.-.S-22
CBT 02/11/91 #1 5300-10338 Sch 5"
CET 02/11/91 #1 9858-10361 Sch 5"
Completion 02/11/91 #1 9777-10190 Sch 5"
CBT 02/01/91 #1 9350-10163 Sch 5"
CET 02/01/91 #1 9350-10186 Sch 5"
Completion 02/10/9i #1 9762-10153 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561.5111
TO: DISTRIBUTION Date: 02/04/91
T#:82028
FROM:
SUBJECT:
Information Control
Well Records LR2-1
,BP CA,~ED HOLE FINALS
Enclosed is your copy of the rnatedai listed below, if you have any questions, please contact BP
Well Records at (907) 564-4445.
K-04 TEMP 01/18/91 #1 8000-8935 CAMCO
P-19 PROD-F 01/21/91 #1 9850-10200 CAMCO
P-20 CCL/TEM P 01/18/91 #1 11800-12500 CAMCO
_
Z-01 CCLFFEM P 01/19/91 #1 9700-10700 CAMCO
5~
5"
5"
5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date: 01/07/91
T#:81922
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP P..A,~ED HOLE FINAL.~
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
F-38 CBT 12/23/90#1 9513-10653 SCH
F-38 CET 1 2/23/90 #1 9513-10675 SCH
J-08 TUBING PUNCHER 12/28/90 #1 2890-5165 SCH
S-29 PERF 1 2/29/90 #1 12420-I 3249 SCH
P-19 PERF 12/29/90 #1 9380-10201 SCH
11
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
JAN 15 1991
Alaska 0il & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: ARCO DATE: 12/31/90
EXXON T#: 81911
PHILLIPS
STATE OF ALASKA
ARCHIVES
SYSTEM Tape & Transmittal Only
BP MAOoNETI¢, LI~; TAP~ & LISTING
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
OPEN HOLE:
S-31 DITE/BHC/CNL 1 2/14/90 #2 7100-11415
SC H#74248 1600 B PI AP1#50-029-22109
TAPE POS.#07526 '~ /~ '~/¢"~'
CASED HOLE:
P-19 CNL 12/16/90 #1 9745-10232
SCH#74249 1600BPI AP1#50-029-22094
TAPE POS.fl07527
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date' 12/20/90
T#:81906
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
P-19 CBT 12/16/90 #1 9400-10207 SCH 5"
P-19 CET 12/16/90 #1 9400-10230 SCH 5"
P-19 CNL 1 2/16/90 #1 9745-10232 SCH 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
Alaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: ARCO DATE:I 1/02/90
EXXON T#: 81625
PHILLIPS
STATE OF ALASKA
ARCHIVES
SYSTEM TaPe ¢ Transmittal Only
BP MA(~NETI¢ I,,I,~ TAPE & LISTING
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
P-19 DIL/MSFL/BCS/H RI/SDL/DSN2
TAPE POS.#07403 HLS#532191
10/22/90 #1 9760-10390
800BPI AP1#50-029-22094
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
REC£1V£D
t,10V 1 4 1990
Alaska O~l & Gas Cons. commission
Anchorage
TO:
THRU:
FROM:
MEMORANOUM Stale of Alaska
ALASKA OIL AND GAS CONSERVATION CO~IISSION
Lonnie C. Smi~R
October 22, 1990
Commis s ioner FILE NO:
JT HH 102f)
· . ~..2
TELEPHONE NO:
SUBJECT:
RIG/BOPE Test
BPX PBU Pad P-19
Permit No. 90-136
Prudhoe 0il Pool
HaroId Hawkins
Petroleum inspector ~
Thursda)I October il, 1990: I went to BPX PBU pad-P to witness a BOP
test on AUDI ~' --~
~.zg ~_. Lewis Bro~rn was the BPX representative. ])an
Hebert was the toolpusher. There were no failures. Attached is an
AOGCC zze~d report·
In surmary: The BOP test on BPX PBU pad P-19 was satisfactorily
per~.oz~ned by AUD 2 rig crew.
02~001A (Rev. 6/89)
20/ll/MEMO1.PM3
OPERATION: Drlg / Wkvr
STATE OF ALASKA
ALASKA 01L AND GAS CONSERVAT i ON COMM I SS I ON
BOPE Inspection Report
/
TEST: Initial~ b/ Weekly~ Other
Well, b
Orlg contrctr ~ b
Housekeeping (general
Reserve pit ~ ,
Well sign.
MUD SYSTEMS:
Trip tank V~al
Pit gauge ~?
Flow monitor
Cas detectors
Audio
Rig,
BOPE STACK:
Test Pressure
Annular preventer
Pipe rams
B]ind rams
Choke line valves ...
HCR valve ~--~
Kill line valves
Check valve ~/~.
TEST RESULTS:
ACCUMULATOR 5YSTEH:
ft
Full charge pressure
Press after closure
Pump incr clos press 200 psig
Full charge press attained ._~.
psig
pstg
min /7 sec
mi n ~)' sec
N 5/.Z 2lmm
Controls: Master . e./_~/~?
Remote ' .i~'/~y B1 i nd switch cover
KELLY AND FLOOR SAFETY VALVES:
Upper Kelly
Lower Kelly
Ball type
Inside BOP
Choke manifold
Number valves //
Number flanges
Hydraulically operated choke
Test pressure
Test pressure
Test pressure
Test pressure
Test pressure
Failures /~ &' ~-- Test time . hfs
Repair or replacement of failed equipment to be made within --~-'-U~ys, Notify
the Inspector, and follow with written/FAXed verification to Commission office,
Distribution:
ortg - AOGCC
c - Operator
c - Supervisor
C.004 (rev 05/10/90)
WITNESS
October 8, 1990
Telecopy:
(907)276-7542
Bill Kirton
PBU Lead Engineer
BP Exploration (Alaska) inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay Unit P-19
BP Exploration (Alaska) Inc.
Permit No. 90-136
Sur. Loc. 2319'SNL, 2057'WEL, Sec. 31, TllN, R13E, UPI
Btmhoie Loc. 395'SNL, l122'WEL, Sec. 06, T10N, R13E, UM
Dear Mr. Kirton:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not exempt you from obtaining additional
permits required by law from other goverrm~ental agencies, and
does not authorize conducting drilling operations until all other
required permitting determinations are made.
The Commission will advise you of those BOPE tests 'that it wishes
to witness.
Sincere ly,
Co~ission~'
Alaska O~l and Gas Conservation Co~ission
BY OF-~ER OF THE COMI-IISSION
dif
Enclosure
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redrillr-]llb. Type of well. Exploratory E] Stratigraphic Test[-I Development Oill[]
Re-Entry [] DeepenF'II Service [] Development Gas [] Single Zone [] Multiple Zone[]
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Ex~lorati(~n KBE = 88' feet Prudhoe Bay Field/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612. Anchorage. Alask~ 99519-6~12 ADL
4. Location of well at surface 7. UnJ't or property Name 11. Type Bond(see 2o AAC 25.025)
2319' SNL, 2057' WEL, SEC. 31, T11N, R13E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
262' SNL, 1212' WEL, SEC. 06, ~14.N, R13E P-19 (41-06-10-13) 2S100302630-277
At total depth ?-×~,,,.-.,' 9. Approximate spud date Amount
395' SNL, 1122' WEL, SEC. 06, T~14N, R13E October 10, 1990 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(uDandTVD)
property line
ADL 28279/395' feet P-20 @ surface~35' feet 2560 102 40'MD/9217'TVDf e e t
16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25.035 ¢,)(2))
Kickoff depth 4ooo'feet Maximum hole angle~6.~6 o Maximum surface 3330 pslg At total depth (TVD) 8800'/#390 pslg
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
20" Cond. 80' Surface 110' 110'
13-1/2" 10-3/4" 45# L-80 Butt 2650' Surface 2680' 2680' 1949 cu ft Permafrost
9-7/8" 7-5/8" 29. 7# L-80 NSCC 9662' Surface 9692' 8776' 1392 cu ft Class G
6-3/4" 5-1/2" 17# NT80-$ FL4S 798' 9442' 8574' 10241' 9217' 168 cu ft Class G
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Surface Conductor ECEIVED
Intermediate
Production
Liner
Perforation depth: measured
true vertical -~-,.~.,
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program []
Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[]
21. I hereby certify~a..~e ,~,rue and correct ,o the best of my knowledge.~
Signed Title PBU Lead En.qineer /' ,~ ~ Date
Commission Use Only
Permit Number IAPI number ~ IApproval date ISee cover letter
~'~ '"/-~/" 15°'~~'- ~ ~ ?~' I 10/08/90 Ifor other requirements
Conditions of approval Samples required [] Yes ~ Mud log requi~d_ [] Yes~.'i__.t'No
Hydrogen sulfide measures [] Yes..~ No Direction~. survey requ~re~ /E~'Yes [] No
Required working pressure for BO~J~E 1-12M~.._~ ~5M; r-I10M; r-115M;
Other:~/,,,~"'/ ,,/ /._/,~,//' ,t.. ~' by order of
Approved by ,- ~
Form 10-401 Rev. 12-1-8~x
Submit in triplicate
AFE No. 125291
PROPOSED DRILLING AND COMPLETION PROGRAM
3yELL P-19 [41-6-10-131 PBU
Install and cement 80' of 20" conductor to surface.
Install 20" diverter.
The Drilling fluid program will consist of an 8.5-9.5 ppg spud mud in the 13-
1/2" hole, a 9-9.7 ppg water base mud in the 9-7/8" hole and a 9.0 ppg water
base mud in the 6-3/4" hole.
Drill 13-1/2" hole to 2700' MD and cement 10-3/4" 45# L-80 Buttress casing to
surface.
Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams,
blind rams, and annular preventer. Maximum possible bottomhole pressure is
4390 psi at 8800' TVDss based on original reservoir pressure. Maximum
possible surface pressure is 3330 psi based on a gas column to surface from
8600' TVDss and an oil column to 8800' TVDss.
Directional drill 9-7/8" hole to the 7-5/8" casing point above the Sadlerochit
Sandstone. Run 7-5/8" 29.7# L-80 NSCC casing to within 10' of 9-7/8" TD and
cement with Class G cement around the 7-5/8" shoe. The annulus will be freeze
protected by dry crude.
Directional drill 6-3/4" hole to TD. Run 5-1/2" liner from TD to 250' inside
7-5/8" casing shoe and cement using Class G cement.
Clean out to 5-1/2" float equipment.
Test casing and lap to 3000 psi.
Change over to NaCL completion fluid.
Run 7-5/8" production packer on tubing. Set packer 50' above top of liner. A
subsurface safety valve with dual control lines will be placed 100' below base
of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test
packer.
The well will be perforated with rig off location.
Fluids incidental to the drilling of a well will be pumped down the 7-5/8" x 10-
3/4" annulus of the well.
Tubing Size:
4-1/2", 12.6# L-80, TDS R-3 TBG with 7 GLM's.
Tailpipe Size:
sal: 9/11/90
4-1/2" TAILPIPE
PROPOSED DOWNHOLE DIAGRAM
WELL P-19 [41-6-10-13] PBU
PROPOSED DEPTH
BKB
20" Conductor 110
Ball Valve 2100
10-3/4" Casing Shoe
13-1/2" Open Hole
2680
2700
Calculated cement top 3210'
4-1/2" 12.6# L-80 TDS R-3 Tubing with 7 GLM's
7-5/8" Packer 9392
5-1/2" Tieback Assembly
9442
7-5/8" Shoe 9692
9-7/8" Open Hole 9702
5-1/2" 17# FL4S NT-80S Liner
5-1/2" PBTD 10171
5-1/2" Liner Shoe 10241
6-3/4" Open Hole 10241
SAL: 8/24/90
PRELIMINARY WELL PLAN
Well:
P-19
LOCATION:
Surface:
Target:
T.D.:
ESTIMATED START:
[41-6-10-13] PBU
2319' SNL, 2057' WEL, Sec. 31 , TllN, R13E
262' SNL, 1212' WEL, Sec. 6, Tl lN, R13E
395' SNL, 1122' WEL, Sec. 6, Tl lN, R13E
October 1990
OPR. DAYS TO COMPLErE: 24
Alaska United #2
MAX ANGLE/SECT COURSE/KOP/BUILD RATE:
I;~m TVD~$
36.26/S 34.1
20" CONDUCTOR
10-3/4" SHOE
BASE WEST SAK FORMATION
IKRU-PBU
7-5/8" SHOE
TOP SAG RIVER SANDSTONE
TOP SADLEROCH1T
TARGET
TOTAL DEPTH
E/4000/2.5
MD(BKB) Mud Wt.
110 8.5
2588 2680 9.5
5593 5859 9.O
7353 8041 9.0
8683 9692 9.7
8692 9702 9.0
8809 9847 9.0
8907 9969 9.0
9126 10241 9.0
LOGGING PROGRAM:
Open
H01e - Record all logs on magnetic tape where applicable.
9-7/8" Hole: None
6-3/4" Hole: GR/SP/DIL/BHCS, GR/CNL/LDT, RFI' and
optional sidewall coring
Cased Hole
CBT/CET and Gyro.
sal: 9/11/90
Perforate after rig release.
BOP STACK CONFIGURATION
13 5/8", .5000 PSI WP
TRIPLE RAM ST ACK
DRILLING
RISER
ANNULAR
PREVENTER
, , I I
PI PE RAMS
2" KILL LINE
MANUAL
GATE
I
BLIND RAMS
HYDRAULIC
GATE
DRILLING
SPOOL
I
PI PE RAMS
, I I
4" CHOKE LINE
HYDRAULIC MANUAL
GATE GATE
SURFACE HOLE DIVERTER SYSTEM
Two lines venting 90 deg. apart in directions
that ensure safe down wind venting, and ex-
tending to a point at least 100' from any potential
source of ignition.
10" Full Opening Valves
35' or as required
,,,..._ I
· '"- i
3
Dresser Sleeve
10" Diverter Line
1. All pipe connections 150# ANSI
Flanges or welded connections
and secured to prevent movement.
2. Manual 10".b~valve~
mechanically connected to ensure
that one valve is fail-safe open at
all times.
3. All tums are 90 deg. and
targeted.
10" Full opening ball valve w/Hydraulic
Actuator
Cellar
20" Diverter Spool w/10" Side Outlet
KRL 12/18/89
WELL No. P-19
LAT. ==
LONG. = ~34~°56'17.205
y = ~5,947,047.85 A.S.P:
X ... .631,343.35 ZONE
' 2057' FROM WEST LINE
SURVEYOR'S CERTIFICATE
(MILES)
2 3
PADP-19
I hereby certify that I om properly
registered and licensed to practice
land surveying in the State of Alaska,
and that this plat represents a
survey made by me or under my
supervision, and that all dimensions
and other details 'are correct. ..
Date SEPT. 111; 1990:: :LS 'No~.' :'": 17335::--
*'"/ Registered Land'-~yor
WELL PAD "P"
¸th
.Keith A. McNeil
-No. LS 7335
WELL No. P-19 ASBUILT
LOCATED IN PROTRACTED SECTION 31,
TOWNSHIP 11 NORTH, RANGE 13 EAST,
UMIAT MEREDIAN, ALASKA
SURVEYED FOR:
B.P. EXPLORATION
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
SURVEYED BY:
ARCTIC SLOPE CONSULTING GROUP
6700 ARCTIC SPUR ROAD
ANCHORAGE, ALASKA 99518
DRAWN BY: KMC DATE: 9/10/90
.!
251 30
31
5O
31
Ld
31
2057'
T11 N
T1 ON
51
6
NO SCALE PADP-19X
WELL PAD "P"
WELL No. P-19 ASBUILT
LOCATED IN PROTRACTED SECTION 51,
TOWNSHIP 11 NORTH, RANGE 15 EAST,
UMIAT MEREDIAN, ALASKA
SURVEYED FOR:
B.P, EXPLORATION
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
SURVEYED BY:
ARCTIC SLOPE CONSULTING GROUP
6700 ARCTIC SPUR ROAD
ANCHORAGE, ALASKA 99518
DRAWN BY: KMC IDATE: 9/12/90
$45DUA124:[DRAN034]P19 CLOSAP SHORT.LIS;1
Search Radius= 200 COURSE LINE
For proposed well: P-19 [11- 6-10-13]
Location = W-E S-N TVD(SBS)
Top 631343.00 5947048.00 -92.00
Bottom 633176.34 5944439.18 9005.00
lI-SEP-1990 15:34
--- Closest Approach Analysis ----
Date: ll-SEP-90 Time: 15:34:34
Note: All depths in feet Below Kelly Bushing (BKB)
Page 1
Closest Approach
WELL IDENT /PROPOSED% /NEARBY~ CLOSEST
TVD DEPART TVD DEPART DISTANCE
A029-1000200
P-Sl
A029-1000202
P-56
A029-1000204
P-62
A029-2053600
MPTR43
NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW
NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW
NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW
7935.8 2336.7 8029.3 4096.9 1019.4
SUMMARY
The well which comes closest to the proposed well is:
A029-2053600 MPTR43
Closest approach distance = 1019.4 feet
KICK OFF for this run = 4000.0 feet
Vertical Intersection
/PROPOSED\ /NEARBY~
TVD DEPART TVD DEPART
VERTICAL
DISTANCE
$45DUA124:[DRAN034]P19 CLOSAP SHORT.LIS;1 15:34 Page 1
Search Radius= 200 COURSE LINE
For proposed well: P-19 [11- 6-10-13]
Location = W-E S-N TVD(SBS)
Top 631343.00 5947048.00 -92.00
Bottom 633176.34 5944439.18 9005.00
Note: Ail depths in feet Below Kelly Bushing (BKB)
ll-SEP--1990
--- Closest Approach Analysis ---
Date: ll-SEP-90 Time: 15:34:34
Closest Approach
WELL IDENT /PROPOSED% /NEARBY% CLOSEST
TVD DEPART TVD DEPART DISTANCE
A029-1000200
P-51 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW
A029-1000202
P-56 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW
A029-1000204
P-62 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW
A029-2053600
MPTR43 7935.8 2336.7 8029.3 4096.9 1019.4
Vertical
/PROPOSED%
TVD DEPART
Intersection
/NEARBY~
TVD DEPART
VERTICAL
DISTANCE
SUMMARY
The well which comes closest to the proposed well is:
A029-2053600 MPTR43
Closest approach distance = 1019.4 feet
KICK OFF for this run = 4000.0 feet
WELL P-19 (11-6-10-13~
Cement Calculations
J0-3/4" CASING
Measured Depth: 2680'
Basis: 2 X Annular volume
Total Cement Vol: 1949 (cu ft)
7-5/8"CA$IN(~
Measured Depth:
Basis:
Total Cement Vol:
Lead Slurry Vol:
Tail Slurry Vol:
9692'
90% Annular Volume to 10-3/4" + 36 cu ft
1392 (cuft)
1242 (cuft)
150 (cu ft)
5-1/2" LINER
Measured Depth:
Basis:
Total Cement Vol:
10241' (Shoe)
1.5 X Annular volume to 7-5/8" shoe + 100 cuft
168 (¢u ft)
sal: 9/11/90
·
·
·
r 4 ct D
Fo rtuD
ro T~r
1 - Brandt Dual Tandem Shale Shaker
1- Demco 6-12" Cone Shale Desander
1- Demco 416t! w/16 cones & (1) Demco
48H w/16 cones (Desilter) '
1 - Drilco Atmospheric Mud Degasser
rl~ Ftow,
D£~Co IZ 3
50 e~.. 50
1- 200 gpm Operating Capacity. Centrifuge
15 - Brandt MA5 Mud Mix Agitators 1- 150 bbl. Trip Tank
1- Recording drilling fluid pit level
indicator with both visual and audio
warning, devices at driller' s console
LZsI F0z wmm
APPROVE DATE
(2 8)'" '
(~)
(10 ~ i3). 12.'
13.
(4) Casg
, ,,
(23 :hr: 28)
Company ~ ~ Lease & Well No.
· ,
, YES NO
, ~
Is :he parmA: fee an:ached., ..... .................................. :. ~
14.
15.
16.
17.
18.
!9.
20.
21.
23.
24.
25.
26.
27.
28.
Z. Is well :o' be located in a defined pool .............................
3. is well loca:ed proper dis:anco from property line .., ...............
4. Is well located proper dis:anco ~rom other wells ........ ~ ...........
5. is sufficien= undedicated acreage available in :his pool ............
6. Is well =o be deviated and is we!lbore plat included ................
7. Is operator :he only affected parry. ......... ' .......................
8. Can permi= be approved before fifteen-day wa_it ......................
Does operator have a bond in force ..................................
is a conservation order needed ......................................
Is ad~s=rative approval needed ...................................
Is =he lease number appropriate .....................................
Does =he well have a unique marne and number ..................... · ....
IS c6nduccor string provided ........................................
Will surface casing pro=ac: all zones reasonably ~xuec:ed :o
serve as an underground source of drinkf~g wa:ar .....................
Is enough careen: used =o circulaua on conduc:or and suvaco .........
W~I :amen: :ia in surface and intarmedia:e or produc:ion strings ...'
Will cement cover ~ known produc:ive horizons .....................
Will al! casing give adaqua=a safety in collapse, :ension and burs:..
ts =his well to be kicked off from an e---~lsting wei!bor~ .............
Is old wellbore abandoumen= procedure included on 10-403 ............
is adequate wellbore separation proposed ..................... ' ......
is a d/veT=ar system r~quired .......................................
Is ~he dri!/.img fluid program schematic and list of equipmen: adequa:e
Are necessary dlagr~.s and descriptions of ~iveruar and BOPE atuached.
Does BOPE have sufficien: pressure rating - Test ~:o ~-Ooo psig ..
Does ~he choke manifold comply w/APl R~-53 (May 84) ..................
IS :he presence of ~2S gas probable ............................. ~...
(6) OTKb~
rev: 01/30/89
6.0IL
·
·
29.
30.
31.
32.
exp. iorauo=t and S=rauigrap. kic we!!sr
Are data presenued on potential overpressure zones? .................
Are seismic analysis data presented on shaJ_low gas zones .............
If an offshore lo¢., are survey resul:s of seabed ¢ondltions presen:ed
Addi=iom~l requiremmmus .............................................
INITIAL GE0. IINIT { 0N / OFF
POOL C-ASS STraTUS AREA NO. SNORE
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
T° improve the readability of the Well History file and to
simplify finding information, information-of this
nature is accumulated at the end of the file under APPENDIX.'
..
No special 'effort has been made to chronologically
organize this category of information.
COMPUTER
DIRECT
DIGITAL
LOGGING
RECEIVED
NOV 1 4 1990
Alaska Oil & Gas Cons. Commission
Anchorage
PROCESSED ANALYSIS
CROFILME
iLLLLLLLLLL
,LLLLLLLLLL
IIIIIIIIII SSSSSSS$
IIIIIIIiII SSSSSSSSSS
ii SS
ii SS
Ii SSSSSSSSS
II SS~SSSSSS
Ii SS
Ii SS
ii SS ~S
iIIIIIIii! ~SS~SS~
IIiiiIIiIi SSS~S~S
DDDDD[)DDD UU UU
DDDDDDDDDD UU UU
DD DD UU UU
DD DD UU UU
DD DD UU UU
DD DD UU UU
DD DD UU UU
D D D D U U U U
D D D L~ U U U U
D D D D U iJ U U
DDDDDDDDDD UUUUUUUUUUUU
DDDDDDDDD UUUUUUUUUU
MM MM
HHM HMH
H F1 H H FI F1 H H
Ht"I HH HH HH
M M H M H M Fi M
Fi H Fl H F1 H
J'J J"J HJ"I
MM HH
H H H Fi
HH
HH HH
MM HH
PPPPPPPPPP~
PP ~
pp ~
PP
9999999999
999999999999
99 99
99 99
99 99
999999999999
999999999999
99
99
99 99
999999999999
9999999999
2222222222
222222222222
22 22
22
22
22
22
22
22
22
222222222222
222222222222
NH NH
NH NN
NNN NH
NNNN NN
NN NN NN
NN NN NH
NN NN NH
NN NH NN
NN NN NN
NN NNNN
NN NNN
NN NN
00000000
0000000000
O0 O0 88 88
O0 O0 88 88
O0 O0 88 88
O0 O0 88888888
O0 O0 88888888
O0 O0 88 88
O0 O0 88 88
O0 O0 88 88
O00O'O00000 888888888888
00000000 8888888888
000000000000 VV VV
000000000000 VV VV
O0 O0 VV VV
O0 O0 VV VV
O0 O0 VV VV
O0 O0 VV VV
O0 O0 VV gV
O0 OO VV VV
O0 O0 VV VV
O0 O0 VV VV
000000000000 VV
000000000000 VV
AA
AA AA
AA AA
AA AR
AA AA
AAAAAAAAAAAA
AAAAAAAAAAAA
AA AA
AA AA
AA AA
AA AA
9999999999
999999999999
99 99
99 99
99 99
999999999999
999999999999
99
99
99 99
999999999999
9999999999
MM
i"i H ii
H H H Fi It t'lJ
HH MM t, iH ~
NH HHHH
MM HH
HH
HH
MM
HM
HH
t'itt
O00OOOOO
000000000
O0
O0
O0
O0
O0
O0
O0
O0
000000000,
00000000
REEL HEADER
Previous reel:
Date: 9071l?02
Comment~:
HEADER
Origin:
RECORDS
Reel namm:
532191
Page
Continuation
I I
TAPE · HEADER
Service name: &GSFO1
Previous tape:
Date: 9071i/02
Comments:
Origin:
Tape name:
532i91
Continuation #: O1
FILE HEADER
File name: .001
Service name:
Version
Date:
Maximum length: 1024 File type: LO Previous ?ile:
I NFORMAT I ON RECORDS
I'1N E !'1
CN
W N
FN
COUN
STAT
CTRY
AP iN
LAT i
LONG
SECT
T 0 W N
RAI'.IQ
EK8
E [>F
EG[_
PD
LMF
DMF
RUN
TIME
[)ATE
LOC
SOH
L U N
FL
LUL
ENGi
WI TH
D D
DL
CBD i
CSLi
TLI
8LI
Tu~
TLA8
8HT
MT
DFD
HV I S
DFPH
DFL
RM
RMF
NFST
MFSS
RMC
C 0 N T E N T S
UNIT
BP EXPLORATION
P-J9
PRUDHOE BAY [>ATE LOGGEu
NORTH SLOPE .......
PlLH:SKR .......
USA .......
'22094. 000 ..................
0 Deq, 0 Min, O, 0 Smc
0 De~ 0 Min. O, 0 Smc
31 .....
11N ....
i~E ....
0.000..
92,020,
54,000 ........
HS ............
DF .............
L)P ...............
i I i ~ I i I I i , , , i m I l
2144,000 ...........
22,." i 0/90 .........
30 ...............
532191 ......
7611/51 ~J..~': .......
NORTH SLOPE
NORTH SLOPE
' ) '.'' ~ ' : · ,,
RHN[ ELL/~HRBRL,,HcKH'r
LEWiS/WELLS
10360.000
10362,000
9768.000,
9770,000,
9764,000,
10356,000
t600,000,
2144,000,
202,000,,
202,000,,
LIGNOS
CIRCULATED
9.500.
4i,000
4,200,
3.200.
1.820.
2.140,
56,500
HEAS, .
2.360 ........
APl
i 0-2:--'&24-90 ....
i I I I I · i i i i I i I
i~# i · !i it .i iI I
. , .1. , ,, II ~, ,I
. , , . , , i , , , , , i , i , I, ,. ,I . , , . .
i I i t i i I , i i , I I i Ii Ii ii i , I i i i i i
I
I lIli
·
,
i IilIi
m IllII
i
I ,
NUH: 50-029-22094-00 ...........
t i i I i ,
i
.
·
!
1,
,
l
i
i
IIlII
IIII
,,il
.liilliiiilIli,i
lilt
IIII
I
,it,lilll
,IIIIIIll
FT
FT
FT
FT
FT
FT
FT
FT
FT
HR
HR
DEQF
DEQF
LB/Q
CP
OHHH
OHMM
DEGF
OHMH
TYPE
CRTG
0
0
0
0
0
0
0
0
0
0
0
0
3
3
0
0
0
0
0
0
0
0
0
0
3
3
4
I
SIZE
40
40
40
'20
20
20
4
34
34
2
3
4
4
4
2
2
2
2
4
2
iO
iO
20
20
20
20
4
4
4
4
4
4
4
4
4
4
20
~U
4
4
4
4
4
4
4
12
4
CODE
65
65
65
65
65
65
65
65
6.5
68
65
79
68
65
65
65
65
65
65
65
68
68
68
68
68
68
68
68
68
65
65
68
G8
68
G8
68
6'8
65
G8
Page
ERROR
MHEM
MCST
MCSS
I NFORMAT I ON RECORDS
CONTENTS
UNIT
70.300 ..................................................
blESS .............................................
~ 625
~I IlIlIIIIIIIlmlIllJIlIIlIIImIlIIIIIiIiilIiWilIiieIii
6 750
I IWllllt/IIWIIlIIIlIIIlIlItIImllIlllllmIlIIIlIlIlmII
DEGF
TYPE
CATG
SIZE
4
i2
4
4
CODE
68
68
68
Page
ERROR
COMMEHT RECORDS
Well [.ocat
!,.Icl 1 Locmt
!,.icl 1 l_ocat
Wel 1 Locat
&tel 1 Fi lm
t,~el I Fi le.
&Iai 1 Fi lm
ion Comment l: SURFACE: 2319'
ion Comment 2:
ion Comment 3:
ion Comment 4:
Commmnt i: USED SAME GAMMA RAY
Commmnt 2:
Comment 3:
FOR
DOWN LOGS #1<10-22-90)
& REPEAT DIL?8CS. FILES
FNL & 2057" FEL
THE FOLLOWING:
DOWN LOGS #2(10-24-90) AND FOR MAIN
ON TAPE: #1 = MAIN~ #2 = REPEAT~
Well Film Comment. 4: #3= DOWN LOGS #1~ #4 = DOWN LOGS #2
*:~ LIS tape written bp: ANCHORAGE COMPUTING CENTER .m
mm All curve and tool mnemonics used are those which most closelp match mm
:~:~ Halliburton curve and tool mnemonics, ~
HALLIBURTON TO SCHLUMBERGER TOP 80TTOM
MNEH SERVICE UNIT MHEM SERVICE UNIT DEPTH DEPTH
DEPTH FT DEPT FT 9750,00 10390,00
TENS DILBCS LBS TENS DILBCS LBS 9767,50 10390,00
SP DIL MV SP DIL MV 9767.50 10390.00
GR DILBCS AP1 GR DIL. BCS APl 9767,50 10390,00
CALl MSFL IN CALl MSFL IN 9767,50 10390,00
ILD DIL OHMM ILD DIL OHMM 9767.50 10390.00
ILM DIL OHNN ILM DIL OHMM 9767,50 1 0390, O0
NSFL NSFL OHNN MSFL MSFL OHMM 9767.50 1 0390. O0
DT BCS US/F DT 8CS US/F 9767.50 1 0390, OO
TT1 8CS US TTI 8CS US 9767.50 10390,00
Page
BCS'
BCS
BCS
HRISDL
OSH2
DSH2
DSN2
DSH2
SDL
SDL
SDL
SDL
SDL
SDL
SDL
SDL
HP.I
HP, I
HR!
HP, I
US
US
US
GAPI
CPS
CPS
DECP
C,,'C
DECP
CPS
CPS
6?03
IN
OHMM
TT2
TT3
TT4
FDSN
NDSN
NPH I
NRAT
DPHI
DRHO
FSDL
NSDL
PE
PELC
RHOB
F:ALI
H D R
H D X
HHR
HMX
HDRS
BCS
BCS
BCS
HRISDL
DSN2
DSN2
DSN2
DSN2
SDL
SDL
SDL
SDL
SDL.
SDL.
SDL
SDL
HRI
HR I
HRI
HRI
HR I
US
US
US
GAPI
CPS
CPS
DECP
C?C
DECF'
CPS
CPS
G/C3
IN
OHMM
9767 50
9767 50
9767 50
9767 SO
9767 50
9767 50
9767.50
9767,50
9767.50
9767.50
9767,50
9767.50
9767,50
9767.50
9767 .50
9767 50
9767 50
976.7 50
9767 50
9767 50
9767 50
0390 O0
0390 O0
0390 O0
0J90 O0
0390 O0
0390 O0
0390 O0
0390 O0
0390 O0
0390 O0
0390 O0
0390 O0
0390, O0
0390 O0
0390 O0
0390 O0
0390 O0
0390 O0
0390 O0
0390 O0
0390 O0
HMRSI
DFL1
SPI
TENSI
DLOD1
HRI
HRI
HRI
HRISDL
HRISDL
OHMM
OHMM
MV
LBS
COMMEN
HHRS HRI
DFL HRI
SP HRI
TENS HRiSDL
DLOD HRISDL
T RECORDS
OHMM 9?6?° 50 10390. O0
OHMM 9767.50 1 0390. O0
MV 9767.50 1 0390. O0
LBS 9767.50 10390. £10
9767.50 i0390.00
Page
DA
T~. FORM~
ENTRY BLOCKS .~*: ~:~
EN TRY
lIII'IlltllllIIlllIlIIIlIIlIIlIlII
OIIIIIllIllIIIIIIIIlIIlIIIlIIIIllI
T SPEC I F I CA
TYPE SIZE CODE
~..~m:~ ENTRY 8LOCK LEGEND
TYPE DESCRIPTION
16 Datum s~eci?icmtion
0 Termina or ( no more
block sub.-t~pe
entries )
0 i 66
TIONS
Pag~
QATA FORMAT
oPEC I F I CA T IONS
Pag~
· e*** [>ATUH 9PEClFICATiON 8LOCKS ****
SERVICE SERVICE
MNEH iD ORDER #
AP1 APl AP1 APl FILE
UNIT LOG TYPE CLASS MOD #
PRC #
SiZE LVL SHPL
RC
PROCEgS iNDiCA
DEPT 532191
TEHS DILDCS 532i9i
SP DIL 532i91
GR DiLDCS 532i9!
CALl MSFL 532i9i
ILD OIL 5J2i9i
ILH DIL 532i9i
MSFL MSFL 5~2i91
DT BCS 5~2i9i
TTi BCS 5S2i91
TT2 BCS 532i9i
TT3 8CS 5~2i9i
TT4 8CS 5~219i
GR HRiSDL 5~i9i
FDSN DSN2 5~2i9i
NDSN DSN~ 532i9i
NPHI DSN2 5S2i9i
HRAT DSH2 532191
DPHI SDL 5~2i91
DRHO SDL 5~2i9i
FSDL. SDL 5~2i91
HSDL SDL 5~2i9i
PE SOL 532i9i
PELC SDL
RHO8 SDL 53~i~1
CALI SOL 53219i
HDR HRI 5~2i9i
HDX HRI 532i9i
HHR HRI 5~219i
HHX HRI 5~2191
HDRS HRI' 5~191
HHRS HR! 5~2igi
DFL HRI 5~i9i
SP i.,tRI 53~i9i
TENS HRISDL 5~19i
DLOD HR~SDL 5~i9i
FT 0 0 0 0
LBS 94 6~5 0 i
HV 94 1 0 i i
APl 94 31 0
IN 94 280 2 i
OHMH 94 120 46 i
OHHt'l 94 i~O 44 i
OHHM 94 ~70 4 i
US,-'F 94 5~0 ~2 i
U~ 94 5~ ~ i
US 94 52~ ,.z i
US 94 5~
US 94 5~
~APi 94 0 0 i
uP._ 94 0 0 i
CPS 94 0 0 i
DECP 94 0 0 i
C/C 94 0 0 i
DECP 94 0 0 i
G/CJ 94 0 0 i
CPS 94 0 O i
CPS 94 0 0
94 0 0 J
94 0 0
G/C~ 94 0 0 i
I H 94 0
94 0 0
94 0 0 i
94 0 0 i
94 0
OHHH 94 0 0 i
OHHH 94 0 0 i
OHMN 94 0 0 1
HV
LBS 94 0 0
94 0 0 1
0 4 0 i 68
0 4 0 i 68
0 4 0 i 68
0 4 0 I 68
0 4 0 1 68
0 4 0 i 68
0 4 0 1 68
0 4 0 i 68
0 4 0 i 68
0 4 0 i 68
0 4 0 I 68
0 4 0 i. 68
0 4 0 i 68
0 4 0 i 68
0 4 0 J 68
0 4 0 I 68
0 4 0 i 68
0 4 0 1 68
0 4 0 1 68
0 4 0 i 68
0 4 0 i 68
0 4 0 i 68
0 4 0 1 68
0 4 0 1 68
0 4 0 i 68
0 4 0 i 68
0 4 0 i 68
0 4 0 i 68
0 4 0 i 68
0 4 0 i 68
0 4 0 i 68
0 4 0 1 68
0 4 0 i 68
0 4 0 i 68
0 4 0 i 68
000000 000000 O00000
000000 000000 000000
000000 000000 000000
O00OO0 O00OO0 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
DEPT
DT
NPHI
RHOB
DFL
TENS
TTi
NRAT
CALl
SP
TT2
.DPHI
HDR
TENS
DA
GR
II.~
DRHO
HDX
DLOD
TR
RECORDS
CALl
TT4
FSDL
HMR
ILD
NSDL
HN ,'4
ILM
FDSN
PE
MSFL
PELC
HHR9
Page
1 039 0
0
-' L"* '.--t ~
--9 9 9
- .~.=~ 54
0200
84
2
5
I0100,
88,
,
2,
9 ,
9900,
88,
-999,
-.999,
-999.
.000
,000
,250
,250
.250
, '000
,250
.250
,250
,000
.000
,232
,gO9
,653
000
lO0
271
~97
148
000
800
250
250
250
000
200
250
250
250
2122.000
3i4,000
-999,250
-999,250
-999,250
4392,000
290,000
-999.250
-999,250
-999,250
4~57,000
315,000
4,904
6,730
269,493
4~43,000
317.000
5,766
6.974
265,499
4377,000
327,000
-999,250
-999,250
-999,250
4645,000
25~,000
-999,250
-999,250
-999,250
O. 000
330. OOO
-999.250
-999,250
-999.250
-44.600
294,000
- 99'.-3,250
-99'3.250
-999,250
-60,500
3i 9,000
,206
302.662
485.3.677
-86. 000
322. 000
,i53
146, ,198
4996,432
-108,600
3~'~ 000
-999,250
-999,250
-999.250
-104,100
262,000
-999,250
-999,250
-999,250
0.000
495. O00
-999,250
-999,250
-9'99.250
19,700
432,000
-999.250
-999,250
26,300
480.00.0
,019
80.777
1155,662
24.300
-,012
24,405
1245,900
21 .700
506,000
-999,250
~9, 0
-999.250
71.000
372,000
-999,250
-999,250
-999,250
0o000
499,000
-999,250
-999,250
6,680
433,000
-999.250
-999.250
6.930
483,000
7628,672
~36,883
6,950
483',000
6076,895
156.928
6,960
499.000
-~¥~,~DU
-999,250
7,130
375,000
-999,250
-999,250
1.000
-999.250
-999,250
-999,250
2,767
-999,250
-999. 250
-999.250
2.483
30.673
15101,461
40,968
6,397
24.669
13937.734
8.329
11,858
-999,250
-999,25'0
-999,250
7,638
-999,250
-999,250
-999.250
i 00000,020
-999,250
-999,250
-999,250
3,236
-999,250
-999.250
-999.250
2.483
5098.768
2.496
2.496
6.123
3935.747
4.034
6,268
9.638
-999,250
-999,250
-999,250
7,534
-999,250.
-999,250
-999.250
1 ,000
-999,25 0
-999,250
-999,250
10,423
-999,250
-999.250
-999.250
9.441
23219.977
2.407
2.629
~5,171
21076.094
4.209
5.787
15.417
-99'9,250
-999,250
-999,250
5,754
-999.250
-999,250
-999,250
DATA RECORDS
DEPT
DT
NPHi
RHO~
DFL
TENS
TTi
NRAT
CALI
SP
TT2
DPHI
HDR
TENS
GR
TT3
DRHO
HDX
DLOD
CALI
TT4
FSDL
HMR
ILD
N~DL
HHX
ILM
FDSN
PE
HDRS
MSFL
NDSN
HMRS
Page
9800,000
55.700
-999,250
-999,250
-999.250
4542,000
~¢'~,UUU
-999.250
-999,250
-999,250
-i12,500
273,000
-999,250
-999,250
-999,250
77.400
399,000
-9'99.250
-999.250
-999,250
7,350
389. 000
-999.250
-999.250
46,989
-999.250
-999.250
-999,250
60,256
-999,250
-999.250
296,483
-':~.~.~, ~D U
-999,250
FILE TRAILER
Fil~ name: &G§FO1 . 001
Maximum length: t024
TRAILER RECORDS
Fil~ type: LO
Version #:
Date:
Page
~.'** FILE HEAl, ER ****
File n~me: ,002
Service name:
Version #:
Dmte:
Maximum length: 1024 File type: LO Previous f'ile:
I NFORMAT I ON
RECORDS
Pag~
11
M N E M
CONTENTS
UNIT TYPE CRTG SIZE CODE ERROR
C: f..I
W H
Fi'4
C 0 U 1',i
9TAT
U
APIN
LATi
LONG
SECT
T 0 W 1',1
R A N G
EK B
EDF
EGL
PD
LMF
Dt'tF
R U
T.i blE
[)ATE
LOC
SON
L U N
FL
LUL
ENG I
WI TH
DD
DL
CBDi
CSL1
TLI
BLI
TCS
TLA8
8HT
MRT
PISS
DFD
NV I S
DFPH
DFL
RH
RHF
t4FST
HFSS
R t,l C
BP EXPLORATION
P-iS
PRUDHOE BAY
NORTH SLOPE
ALASKA
USA .......
22094. OOO ..................
0 Drag, O Min. O. 0 ,mc
0 Dmg. 0 M in. O, 0 o
111',1 .......
I~E .....
0,000.. ,
9z, 020, ,
54. 000,
HS .....
DF .....
DF .....
2144, OOu
22/1 0/90
532191 ,
,7611 ,.;51939 ,
HORTH SLOPE
HORTH SLOPE
': 1~ "': ' I'l '
R~-i N [: ELL,' ~ F~RBR .. ,' H ci'... R Y
LEWIS/WELLS
I 0360,000
1 0~62,000
9768,00 O,
9770,000,
9764,00 O.
I 0356.0 0 0
1600,000,
2144,000,
2'02. 000,,
202· 000..
LIGNOS
CIRCULATED
9,500. ,
41 .000 .
4,200. ,
3.200. .
1 ,820. ,
2,140, ,
56,500 ,
MEAS,
2,360 ........
IIII
III!
AP1 f.iLiM: 50-02'9-22094-00 ...............
[:,ATE L l_l u is ir... 12
I I I I I I I I I I I I I I I I I I I I I I I I I
·
!
i
i
,
iiimmi
m
I
m Itl
IilIillI
iIlilltl
illll
ilill #llifliliIi
iltii IIIIilllIiI
Ii,ti
illii
,
,,,1·1!
IIIIllItllIlIIII
IIlIImIIIIIIIIII
0 0
0 0
0 0
0 0
0 0
u u
0 0
0 0
0 0
· 0 0
0 0
0 0
FT 0
FT 0
FT -0
0 3
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
FT 0
FT 0
FT .0
FT 0 3
FT 0
FT 0
HR 0 2
HR 0 4
DEGF 0 1
DEaF :0 1
0 2
0 2
LB,;'] O 2
CP 0 2
0 2
0 2
OIH hi i"'l l.i 2
0 H H H O 2
DEGF I0 2
0 2
OHHH 0 2
40 65
40 65
40 65
20 65
20 65
:-'U
34 65
34 65
2 65
3' 65
:3 65
4 6,9
4 6S
4 6',9
2 65
2 65
2 65
2 79
4 68
:8 65
2 79
lO 65
10 65
20 65
2.0 65
20 65
20 65
4
4 68
4 68
4 68
4 '68
4 68
4 68
4 68
20 65
20 65
4 68
4 68
4 68
4 68
4 68
4 68
4 68
12 65
4 68
MNEM
HCST
HCSS
CS
BS
I HFORMAT 1 ON RECORDS
COI-,IT ENTS
UNIT
70.300 ..................................................
HEAS .............................................
7.625
6.750 ...................................................
DEGF
TYPE
CATG
SiZE
4
i2
4
4
CODE
68
Page
ERROR
COMMENT RECORDS
We 1
W e 1
W e 1
We 1
We 1
1 Location Comment
1 Location, Comment
1 Location Comment
1 Location Comment
1 File Comment $:
1 File Comment 2:
1 File Comment 3:
1 File Comment 4:
l: SURFACE: 2319' FNL & 205?' FEL
4:
USED SAME GAMMA RAY FOR THE FOLLOWING:
DOWN LOGS #1<10-22-90) & DOWN LOGS #2<10-24-90) AND FOR MAIN
& REPEAT DIL?BCS. FILES ON TAPE: #! = NAIN~ #2 = REPEAT~
#3= DOWN LOGS #1; #4 = DOWN LOGS #2
LIS tape written by: ANCHORAGE COMPUTING CENTER
All curve and tool mnemonics used are those which most closely match
Halliburton curve and tool mnemonics,
HALLIBURTON TO SCHLUMBERGER TOP BOTTOM
MNEM SERVICE UNIT MNEM SERVICE UNIT DEPTH DEPTH
Page
13
DEPTH FT DEPT FT 9750,00
TENS2 D ILBC'S LBS TENS DILBUo LBS 9767,50
SP2 [)IL MV SP [)IL. MY 9767.50
GR2 DILBCS AP1 GR DILBCS APl 9767.50
CAL I2 MSFL IN CALI MSFL IN 9767,50
ILD2 DIL OHMM IL[) DIL OHMM 9767,50
ILM2 OIL OHMM ILM DIL OHMM 9767.50
HSFL2 MSFL OHMM MSFL MSFL OHMM 9767.50
DT2 BCS ".q '" C"" .
u~r DT B~o US/F 9767 50
TT12 BCS US TT1 8CS US 9767.50
10390 O0
10390 O0
I 0390 O0
1 0390 O0
10390 O0
10390 O0
10390 O0
1 0390. O0
10390, O0
1 0390, O0
TT22
TT32
TT4,2
BCS'
BCS
BCS
US
US
US
TT2'
TT.'3
TT4
BCS
BCS
US
US
US
~767.50
',~767.50
J 03'~0. O0
10390, O0
! 03."30, O0
DA
TA
ENTRY BLOCKS
ENTRY
FORMAT
oPECIFICA
TYPE SIZE CODE
i6 1 66
TIONS
Pag~
ENTRY BLOCK LEGEND
TYPE DESCRIPTION
Datum zpmci¢ication block sub-t, ypm
Tmr. mina~or~ ( no morm mntr. ims ) '
DATA
FORMAT
SPECIFICATIONS
Page
DATUM SPECIFICATION BLOCKS
MNEM
SERVICE SERVICE AP1 AP1 AP1 AP1 FILE
ID ORDER # UNiT LOG TYPE CLASS MOD #
PRC #
SIZE LVL SMPL RC
PROCESS iNDICATORS
DEPT 532i91
TENS DILBCS 532i9i
SP DIL 532i9i
GR DiLBCS 532i9i
CALl MSFL 532i9i
ILD DIL 53~19!
ILM DIL 53219i
MSFL MSFL 532191
DT BCS 53~i9i
TT1 BCS 532i91
TT2 8CS 53~i91
TTJ BCS 532i9i
TT4 BCS 532i91
FT 0 0
LBS 94 G~5
MV 94 iO
API 94 3i0
iN 94 280.
OHMM 94 i20
OHMM 94 120
OHMM 94 270
US/F 94 520
US 94 522
US 94 522
US 94 522
US 94 522
0 0 2
0 3 i
1 3 1
i 3 i
2 3 i
46 3 i
'44 3 1
4 3 i
32 3 i
32 3 i
32 3 i
32 3 i
32 3 i
4 0 1 68
4 0 i GS
4 0 I G8
4 0 i 68
4 0 i Ge
4 0 ! G8
4 0 I 68
4 0 1 68
4 0 i 68
4 0 ! 68
4 0 I Ge
4 0 i 68
4 0 1 68
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 0.00000 000000
RECORDS
DEPT
TENS
TTi
SP
TT2
GR
ii~
CALI
TT4
ILD
ILM
MSFL
Page
10390.000
0.000
10300.000
80.900
10200.000
84,200
10100.000
87.800
10000.000
93.~00
9900,000
87.900
9800,000
55.600
2049.000
315.000
4337.000
290.000
4338.000
315,000
4335.000
317,000
4360,000
328.000
4647,000
252,000
4589,000
280.000
0.000
329,000
-44.600
294,000
-60.500
320.000
-86.000
321.000
-108,600
333.000
-104.100
260.000
-112.500
272,000
0.000
496.000
19.700
432,000
26.300
480.000
24.300
483,000
21,700
505,000
71.000
37i.000
77,400
388.000
0.000
499.000
6.390
434.000
6.870
482.000
6.880
484.000
6,890
500.000
7,060
374.000
7,280
389.000
1 ,000
2,564
2.382
6. 383
11 .940
7.621
45.604
100000.020
2.735
2,443
6,109
9.661
7.534
63.241
1.000
10.765
9.727
15,417
14.723
5,383
267.917
**** FILE TRAILER ****
F~le name: &GSFO! , 002
Maximum length: i024
TRAILER
RECORDS
Versi on #:
File type: LO
Next ~ile:
Date:
File name: ,003
Service name:
Version #:
Date:
Maximum length: 1024 File type: LO Previous ~ile:
MNEM
CN
W N
FN
COLIN
STAT
CTRV
AP i N
LATi
LONG
SECT
TOWN
RANG
EK8
EDF
EGL_
PD
LHF
DHF
~iJN
T[ttE
D~TE
LCC
SON
LLiN
FL.
LUL
EN~ ~
i.d [ T N
DD
DL
CBD1
CDL ~
TL[
BL,[
TCS
TL~D
BHT
HET
HT
HSS
DFD
NV [ S
DFPH
DFL
EH
EMF
HFST
HFSS
RHC
I NFORHAT I ON RECORDS
CONTENTS
UH I T
8P EXPLORATION
PRUDHOE BAY
NORTH SLOPE
ALASKA
USA
22094 ,,.:
0 Drag u
0 Drag 0
1 iN. ,
13E..
0,000
92 020
54 000
MS ,..
DF . , .
DF . . .
I .
2i44:6oo ,
22/1 0/90 .
-0
532191 , ,
7611251939 , .
NORTH SLOPE
NORTH SLOPE
RANDELL/'YARBRO,:HcKAY
LEWIS/WELLS
10360.000 ., ,
I0362.000 ., ,
9768,0 0 0 ....
9770. 000 ....
976,1.000 ....
I 0356,000 . , ,
1600,000, .,,
2144,000 ....
202,000 .....
202,000 .....
· i,.-.o
LIGNOo
CIRCULATED
9,500 .......
41 ,000 .... .. .
4,200, .,.. ,
3,200 .....
1 ,820 .....
2,140 .....
56.500 ....
MEAS. ,
2.360 ........
000 ..... 0 Hin
0 Min
,
,
·
·
AP i NUH:
DATE LOGGED
0 Sm<
50-029-22094-00 ................
,
!
~, m m m
m
m
!
·
m
·
m
m
m
, m J ,
FT
FT
FT
FT
FT
FT
FT
FT
FT
HR
DEGF
DEGF
LB,;G
UP'
OHHH
OHHH
DEGF
OHMH
TYPE
CATG
SIZE
0 0 40
0 0 40
0 0 40
0 0 20
0 0 20
0 0 20
0 0 4
0 0 34
0 0 34
0 -0 2
0 0
0 0 3
0 3 4
-0 3 4
0 3 4
0 3 2
· 0 3 2
0 0 2
0 'O 4
0 0
· 0 0 2
0 0 10
0 0 1 0
0 0 2 0
0 0 20
0 0 2 0
0 0 20
0 3 `1
0 3 4
0 3 4
0 3 4
0 3
0 2 4
0 4 4
0 1
0 1 4
0 2 20
0 2 20
0 2
0 2 4
0 2 4
0 2 4
0 2 4
0 2 4
0 2 12
0 2
CODE
65
65
65
65
65
65
65
65
65
68
68
68
65
65
65
79
65
65
65
65
65
68
68
68
68
68
68
68
68
68
65
65
68
68
68
68
65
68
Page
ERROR
INFORMA
TION
RECORDS
Page
MNEM
MCST
MCSS
CS
BS
CONTENTS
70.:300 ..................................................
MEAS .............................................
7.625 ...................................................
6.750 ...................................................
UNIT
DEGF
TYPE
CATG
SIZE
4
12
4
4
CODE
68
ERROR
C 0 M M E N
T RECORDS
Well Location Comment 1: SURFACE: 2319' FNL & 2057' FEL
Well Location Comment 2:
Well Location Comment 3:
Well Location Comment 4:
~lell File Comment l: USED SAME GAMMA RAY FOR THE FOLLOWING:
Well File Comment 2: DOWN LOGS #1(10-22-90) & DOWN LOGS #2(10-24-90) AND FOR
Well File Comment 3: & REPEAT DIL?BCS, FILES ON TAPE: #1 = MAIN; #2 = REPEAT;
Well File Comment 4: #3= DOWN LOGS #!; #4 = DOWN LOGS #2
MAIN
~,~ LIS tape written b..v: ANCHORAGE COMPUTING CENTER ~
:+:* All curve and tool mnemonics used are those which most closelp match **
** Halliburton curve and tool mnmmonics, **
HALLIBURTON TO SCHLUMBERGER TOP BOTTOM'
MNEM SERVICE UNIT MNEH SERVICE UNIT DEPTH DEPTH
DEPTH FT DEPT FT 9750, (l'O 10390. O0
GR3 DILBCS GAPI GR DILBU~ GAPI 9?60 O0 10360,00
FDSN3 DSN2 CPS FDSN DSN2 CP~ 9760. O0 10J60 O0
NDSNJ DSN2 CPS NDSN DSN2 CPS 9760. O0 10360. O0
oN~ DECP 9760 O0 10o~0 O0
NPHI3 DSN2 DECP HPHI D'~ ~' . ~' .
NR~T3 DSN~ C/C NRAT DSN2 C/C 9760.00 10360.'00
DPHI3 SDL D. ECP DPHI SDL DECP 9760.. O0 I 0~60. O0
DRHO~ SDL ~/C3 DRHO SDL ~/C3 ~760,00 10360.00
FSDL~ SDL CPS FSDL SDL CPS ~760. O0 1 0360. O0
NSDL3 SDL CPS NSDL SDL CPS 9760,0'0 10360. O0
Page
PE3
PELC3
RHOB3
HDRS
HDX3
HMR~
HMXJ
HDRSJ
HMRS3
DFL3
SPJ
TENSJ
SDL
SDL
SDL
HRI
HRI
HRI
HRI
HRI
HRI
HRI
HRI
HRI
SDL
OHMM
OHMM
OHMM
MV
LBS
PE
PELC
RHO8
HDR
HDX
H MR
HM X
HDRS
HMRS
DFL
SP
TENS
SDL
SDL
SDL
HRI
HRI
HRI
HRI
HRI
HRI
HRI
HRI
HRI
SD L
OHMM
OHMM
OHMM
MY
LBS
976
976
976
976
976
976
976
976
976
976
976
976
0 O0
0 O0
0 O0
0 0o'
0 O0
0 O0
0 O0
0 O0
0 O0
0 00-
0 O0
0 O0
0360. O0
0360. O0
0360. O0
0360 O0
0360 O0
0360 O0
0360 O0
0JG0 O0
0360 O0
0360 O0
0360 O0
0360 O0
DA
TA
E H T R Y
FORMA
T SPEC I F 1 CA
TYPE SIZE CODE
16 i 66
TIONS
Page
21
ENTRY BLOCK LEGEND
TYPE DESCRIPTION
16 Datum specification block zub-t.~pe
0 Terminator ( no more entries )
DATA
FORMA
DATUM SPECIFICATION BLOCKS *-**.*
T SPEC I F I CAT IONS
SERVICE SERVICE AP1 AP1 APl API FILE
MNEM ID ORDER # UNIT LOG TVPE CLASS MOD #
DEPT 532191 FT 0 0 0 0
GR DILBCS 532i91 GAPI 94 0 0 2
FDSN DSN2 532i 91 CPS 94 0 0 2
NDSN DSN2 532191 CPS 94 0 0 2
NPHI DSN2 532i 91 DECP 94 0 0 2
NRAT DSN2 53219i C/C 94 0 0 2
DPH! SDL 532191 DECP 94 0 O 2
DRHO SDL 532i91 6/C3 94 0 0 2
FSDL SDL 532i9i CPS 94 0 O 2
NSDL SDL 532i91 CPS 94 0 0 2
PE SDL 532191 94 O O 2
PELC SDL 532i9i 94 0 0 2
RHOB SDL 532i91 ~/C3 94 0 O 2
HDR HRI 5~2i9i 94 0 0, 2
HDX HRI 532i9i 94 0 0 2
HMR HRI 5~2i9i 94 0 0 2
HM~ HRI 5~2i9i 94 0 0 2
HDRS HRI 5~2i9i OHMM 94 0 0 2
HMRS HRi 532i9i OHM~ 94 0 0 2
DFL HRI 532191 OH~M 94 '0 0 2
SP HRI 5J2i91 MV 94 0 0 2
TENS HRISDL 53219! LBS 94 0 0 2
PRC #
SIZE LVL SMPL
RC
PROCESS INDICATORS
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 00'0000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
Page
DATA RECORDS
DEPT GR FDSN NDSN NPHI NRAT
FSDL NSDL PE PELC RH08 HDR
HHX HDRS HHRS DFL SP TENS
10:360.000 0.000 -999,250 -999,250 -999.250
2720.72:9 5661 . 443 . 707 . 733 , 759
6~, 132 1,925 I ,847 :3. 592 209,036
'I0~00.000
8699.@i6
42,439
10200.000
82i9.467
43,997
10100,000
7547,753
i7,133
10000.000
940,4,746
4.276
19
16784
2
26
16834
2
24
16373
21
12
?!
16211
9900,000
6496,620
· 700 5525 . 760 24024 , 039 . 220
,918 2.0'9-31 2, i91 2.268
, 520 2,622 4 , 933 2i 0 , 062
DPHI
HDX
.300 5107,623 23245,848 ,231
,082 2,149 2,216 2,320
,386 2,433 4,690 2i6,490
,300 4399,053 22i89, i25 ,260
445 2,756 3,004 2,342
,832 6,404 9.929 212.543
,700 3,921 ,646 21.382.102 ,29i
,023 2,384 2,64.3 2.207
,974 10,22:3 11,508 217.920
, 000 4029,870 19598,._'395 ,253
, 6."31 2,586 2,624 2,467
, 74 0 6 , 3:31 7 , 993 254 , 40i
9800,000 77,400 12778,879 27240,754 ,077
.3962,75! 14165,682 4,25i 4,308 2,69i
2,075 47.691 23.793 323,286 290,539
-999,250
375.747
1998.573
4,682
30i.655
1998,573
4.901
311,667
2463,549
5.431
134,347
2472,692
6,025
66,367
2526,768
5.250
! 02,254
2:351 , 060
2.297
23,399
2198,430
,057
i i2,980
,232
77,676
,200
79,237
,
23.600
.269
2,002
,11i
16,178
-, 025
- q93
DRHO
HHR
,033
,029
334,639
,04'8
354.803
147. 150
.015
85.561
.057
124.0ii
-.000
14.385
Page
2';
File name: ~GSFO! , 003
Maximum length: i024
TRAILER
RECORDS
Version #:
File tppe: LO
Nmxt f'ile:
Date:
Page
¢
File name: .004
Service name:
Version
Date:
Maximum length: i024 File type: LO Previous ~ile:
M H E H
c: N
td t,i
FN
COUN
9TAT
CTR:¢
AP i N
LRTi
LONG
SECT
T 0 W N
RANG
EKB
EOF
EGt_
LHF
BMF
RUN
TiblE
DATE
LCC
SON
LUN
Fl_
LUL
E N ~'.~ I
WI TN
DD
DL
CBD 1
CBI_I
TLI
BLI
TC,S
TLA8
BHT
MT
MSS
BFQ
HV i S
DFPH
DFL
Ri'iF
MFST
HFSS
RHC
I NFORMAT I ON RECORDS
CONTENTS
UNIT
BP EXPLORATION
P-t9 AP1
PRUDHOE BAY [)ATE
NORTH SLOPE
ALASKA
USA
22094. 000 ..........
0 Dmq, 0 Min, 0
0 Dm~ 0 Min. 0
i 1H. , .
i~E, , ,
0.000.
92 020
54 000
MS . . .
DF . . .
i .
2i44'oo0
22,.; 1 0/9 o
5~2191
761 i/5i 939
NORTH SLOPE
HORTH SLOPE
RANDELL/YARBRO/McKAY
LEWIS/WELLS
i0360.008 ,. .
10362.000 .,
9768, O 0 O, , ,
9770,000, , ,
9764,000, , ,
10356.000 . .
1608,000, ,
2i44,000, , ,
202. OOO ....
202, O00 ....
L I 6NOS
CIRCULATED
9,500 .....
41 . OOO ....
4,200 .....
3,200 .....
i ,820 .....
2,140 .....
56.500. , ,',
HERS,
2,
i ~ m~ m
I I · I
m m ~
360 ..........
~ m
· m
NUM: 50-02g-22094- O0 ................
LOGGEO ~ 0-22&24-90 ................
illlllm lIlllIlllllllflmlilliiliIlI!
ilIiIIi ilIilillilltIllilIlIilliIliI
IIIIIii IIIlIIIIIiiitiiIllIiiIiiliii
Illl}Il
0 ~mc ......................
0 S~ ~ ........................
m
i m
m
·
t
i
i i
TYPE
C A TG
SIZE
0 0 40
0 0 40
0 0 40
0 0 20
0 0 20
0 0 20
0 0 4
0 0 34
0 0 34
0 0 2
0 0 3
0 O 3
FT 0 :3 4
FT 0 .3 4
FT 0 3 4
0 :3 2
0 3 2
0 3 2
0 0 2
0 0 4
0 0 8
0 0 2
0 0 10
0 0 10
0 0 20
0 0 20
0 0 20
0 0 20
FT 0 3 4
FT 0 3 .4
FT 0 3 4
FT 0 3 4
FT 0 :3 4
FT 0 :3 4
HR 0 2 4
HR 0 4 4
DEGF 0 i 4
DEGF 0 1 4
0 2 20
0 2 20
LB,"G 0 2 4
CP 0 2 4
O 2 4
0 2 4
0 H H bi 0 2 4
OHHM 0 2 4
DEGF 0 2 4
0 2 12
OHHH 0 2 4
CODE
65
65
65
65
· 65
65
68
68
65
65
65
79
68
65
79
65
65
65
65
65
65
68
68
68
68
68
6'-"
68
68
68
65
65
68
68
68
68
68
68
65
68
Page
ERROR
2.'
MNEM
MCST
MeSS
CS
BS
I ~FORMAT I ON RECORDS
COHTEHTS
UNIT
70,:300 ..................................................
ME~S .............................................
7'.625 ...................................................
6,750 ...................................................
DEGF
TYPE
CATG
2
2
3
3
SIZE
4
i2
4
4
CODE
65
. --
Page
ERROR
2~
COMMENT RECORDS
Wmll Location Comment
!~mll Location Comment
Wmll Location Comment
&fell Location Comment
Well File Comment
hlell File Comment
Ymll File Comment
l: SURFACE: 2319' FNL & 205?' FEL
3:
USED SAME GAMMA RAY FOR THE FOLLOWING:
DOWN LOGS #1(10-22-98) & DOWN LOGS #2(10-24-90) AND FOR MAIN
& REPEAT DIL?BCS. FILES ON TAPE: #! = MAIN~ ~2 = REPEAT~
Well File Comment 4: #3= DOWN LOGS #i~ #4 = DOWN LOGS ~2
m. LIS tape written by: ANCHORAGE COMPUTING CENTER
m. All curve and tool mnemonics used are those which most closel~ match
** Halliburton curve and tool mnemonics.
HALLIBURTON TO SCHLUMBERGER TOP BOTTOM
MNEM SERVICE UNIT MNEM SERVICE UNIT DEPTH DEPTH
ili
DEPTH FT DEPT FT 9?50,00 10390.00
GR4 DILBCS GAPI GR DILBCS GAPI 9760.00 10236.00
FDSN4 DSN2 CPS FDSN DSN2 CPS 9760.00 10236o00
NDSN4 DSN2 CPS NDSN DSN2 CPS 9760,00 10236,00
NPHI4 DSN2 DECP NPHI DSN2 DECP 9760.00
NRAT4 DSH2 C?C NRAT DSN2 C?C 9760.00
DPHI4 SDL DECP DPHI SDL DECP 9760,00 10236o00
DRH04 SDL G?C3 DRHO SDL G/C3 9760,00 I0236,00
FSDL4 SDL CPS FSDL SDL CPS 9760,00 10236.00
NSDL4 SDL CPS NSDL. SOL CPS 9760,00
Page
PE4
PELC4
RHOB4
HDR4
HDX4
HMR4
HMX4
HDRS4
HMRS4
DFL4 '
SP4
TEl,IS4
SDL
SDL
SDL
HRI
HRI
HP, I
HRI
HRI
HRI
HRI
HRI
HRISDL
G,."C3
OHMM
OHMM
OHMM
MV
L~S
PE
PELC
RHO8
HDR
HDX
HMR
HMX
NDRS
HHRS
DFL
SP
TENS
S [:L
S DL
SDL
HRI
HRI
HRI
HRI
HRI
HRI
HRI
HRI
HRI
SDL
G/C3
OH~
OH~
LBS
9;:'6
976
'976
976
976
976
976
97'6
976
976
976
976
0 O0
0 oo
0 O0
0 O0
0 O0
0 O0
0 O0
0 O0
0 O0
0 O0
0 O0
0.00
0236. O0
0236, O0
0236,00
0236. O0
0236,00
0236, O0
023r-S, O0
0236, O0
0236,00
0236, O0
023~;, 00
0236, '00
DA
TA
ENTRY BLOCK~ '~:~-'~
ENTRY
F 0 R M A
T SPECIFICA
TYPE SIZE CODE
16 1 66
TIONS
Page
2,'.'
ENTRY BLOCK LEGEND ~:~
TYPE DESCRIPTION
16 Datu~ sBeci¢ication block sub-type
0 Terminator ( no mope entries )
DATA
F 0 R M A
DATUM SPECIFICATION BLOCKS
SERVICE SERVICE API API
MNEM ID ORDER # UNIT LOG TYPE
T m=%
oPEC I F I CA
DEPT 532191 FT 0 0
OR DILBCS 53219i QAPI 94 0
FDSN DSN2 532191 CPS 94 0
NDSN DSN2 532191 CPS 94 0
NPHi DSN2 53219i DECP 94 0
NRAT DSN2 532i9i C/C 94 0
DPHI SDL 53~191 DECP 94 .0
DRHO SDL ~32i9i ~/C3 94 0
FSDL SDI. 53~i9i CPS 94 0
NSDL SDL 532i91 CPS 94 0
PE SDL 532i91 94 0
PELC SDL 53219i 94 0
RHOB SDL 532i91 G/C3 94 0
HDR HRI 532191 94 0
HD× HRI 532i91 94 0
HMR HRI 53219! 94 0
HMX HRI 532191 94 0
HDRS HRI 53219i OHMM 94
HMRS HRI 532191 OHbiM 94
DFL HRI 532i91 OHblM 94 0
SP HRI 53219! MV 94
TENS HRISDL 53219! LBS 94 0
API RPI FILE PRC #
CLASS MOD # SIZE LVL SHPL
0 0 4 4 0 1
0 2 3 4 0 i
0 2 3 4 0 1
0 2 3 4 0
0 2 3 4 0
0 2 3 4 0 i
0 2 3 4 0 1
0 2 .3 4 0 i
0 2 3 4 0 i
0 2 3 4 0 i
0 2 3 4 0 1
0 2 3 4 0 i
0 2 3 4 0 1
0 2 3 4 0 i
0 2 3 4 0 1
0 2 3 4 0
0 2 3 4 0 i
0 2 3 4 0 1
0 2
· .:, 4 0 1
0 2 3 4 0
0 2 ~,= 4 0 1
0 2 3 4 0
TIONS
RC
G8
68
68
68
68
G8
Ge
G8
G8
68
68
68
G8
68
PROCESS iNDiCATORS
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000'
000000 000000 000000
Page
2~
DEPT
FSDL
Ht'l ~''
¢'%
0236, 000
8956. ?83
11 , 472
0200. 000
80?3,005
4J , 703
1 01 00,000
8E, 72.869
25,585
10000,000
1 0509,596
6. 179
9900, 000
7802,886
9.753
9800, '000
60R2~ ,0 J 4
1.110
DATA
RECORDS
(IR
NSDL
HDRS
F 0 S N
PE
HHRS
ND SH
PELC
DFL
NPH I
RHO8
SP
NRAT
HDR
TENS
DPH I
HDX
DRHO
22. 000
17005. 187
5,173
26.300
16318.279
2,4i9
24,300
17170,293
6,141
21,700
17555,023
13,564
7I .000
lv5.~ 406
9.168
77,400
16030,410
45,344
4756,
2,
5,
4756,
2,
2.
4103,
3,
5,
4475,
2.
10,
3848.
3,
8,
13879,
4,
31,
229
676
195
229
-- ._
525
877
.375
780
368
847
099
396
060
570
951
402
594
22154
22154
2
5
21395
3
JO
22027
3
i1
19828
3
14
26774
4
247
.383
.i7i
,608
,383
.766
.282
,152
.1GJ
,348
.038
,439
,789
.318
,889
.910
,502
,065
,238
2.334
322.694
,238
2,360
316,550
,269
2.362
306.266
.249
2,242
309. 444
,265
2,418
2,537
. O62
2,578
364,535
5.016
i50.887
254 i . 043
5,016
306.392
2541 , 043
5.614
14i.445
2541.043
5,301
63,895
2541,327
5,550
97,335
2536,624
2,077
21,205
2344,939
.192
27,705
,176
.174
33,07 0
,247
4.619
,140
19.267
.044
.918
.111
34i.82i
,159
155,246
,143
88.752
,144
1 08,327
.162
16,004
Page
:~.:~** FiLE TRAILER
Fi le name: &GSFO1 .004
Maximum length: 1024
TRAILER RECORDS
Version #:
File type: LO
Next f"ile:
Date:
Page
REEL TRAILER
Service name: &~SFO1
Next reel:
Date: 90/11/02
Commentz:
Origin:
Reel name:
532191
Continuation #: O1
**** TAPE TRAILER
Service name: &OSFO1
Date: 90/11702
Origin:
Tape
532191
Continuation #: Ol
Next tape: Comments:
COMPANY NAME
WELL NAME : P-19
FIELD NAME I PRUDH( BAY
BOROUGH : NORTH OPE
STA?E R ,
API NUMBE~ : 50-02;:-22094-009
REFERENCE NO ~ ?424
I CROFILMED
RECEIVED
JAN 1 5 1991
Alaska Oil & Gas Cons. Commission
Anchorage
Ih Tape Verification Listing
chlUmberqer Alaska Computing CeDter
20-DEC-1990 14:26
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE ~ 90/12120
ORIGIN I FLIC
REEl. NAME : 74249
CONTINUATION #
PREVIOUS REEL
CO,,ENT ~ BP EXPLORATION.PRUDHOE BA¥,P-19.50-029-22094-O0
**** TAPE HEADER
SERVICE NAME ~ EDIT
DAT~ I 90/12/20
ORIGIN I FLIC
TAPE NAME .~ I 74249
CONTINUATION # t i
PREVIOUS TAPE
COMMENT I BP E~PL~RATION,PRUDHOE
**** FILE HEADER ****
FILE NAME : EDIT ,001
SERVICE : FLIC
VERSION : 001A06
DATE I 90/12/20
MAX REC SIZE I 1096
FILE TYPE ~ LO
LAST FILE ~
PAGE:
COMPANY NAME: BP EXPLORATION
WMLL~ P-19
F~ELD~ PRUDHOE BAY
BOROUGH'~ NORTH SLOPE
STATE~ ALASKA
API NUMBER~ 50-029-2~094-00
LOCATION: ~3t9' FML & 2057~ FEb
SECTION~ 31 TOWNSHIP~
P~RMANENT DATUM~ ~SL ELEVATION~ 0
LnG ~EASU~ED FRO~ DF 92
RANGE~
ABOVE PERMANENT DATU~
I8 Tame Verification Listing
,Cblumberoer AlasKa Computing Center
20-DEC-1990 14:26
PAG~~
E[~EVATIONS KB:
DATE LOGGED: ~b
RUN NUMBER~ 1
TD DRILLER: 10236
T~ LOGGER: 10235
DF: 92
GL: 53.99999
BTT SIZE 1: 8,75
BTT SIZE 2:
7
BIT SIZE 31 TUBING
TYPE FLUID
IN HOLE~
DENSITY~
BRXNE
9,199999
LOGGING DISTRICT)
LOGGING ENGINEER)
WITNESSI
4615
JOHNSON
PARKER
TOOL NUMBERSl
CAL-YA-1592
SGC-SA-27
CAE-AT
CAE-AU
CAE"AT
CES$'A'758
TCC-B"420
CBC-DB'uu
CBS'CB'B6
CEEC'"A'832
FIELD REMARKS~
TIED, TO HLS SONIC DATED 10-22-90
WELL NOT PERFORATED
RAN A 2,5" CNL ON SANDSTONE MATRIX
DATE JOB STARTED: 20-DEC'90
jOB REFERENCE NOl 74249
LDP/ANA: R, SINES
******************************************************************************
FILE - EDIT,O0~
BP EXPLORATION
PRUDHOE BAY
P-19
50-029-22094-00
PASS ! THRU 4 AND HODGE$ LEHMAN AVERAGE NPHI
DATA SAMPLED EVERY -.5000 FEET
,IS Tape Yerificat~on Listing
~chlumberqer Alaska Computing Center
20-DE'C-1990 14:26
TYPE
CNT-AtD/H
CNT-A/D/H
CNT-A/D/H
CNT-A/D/H
CNT-A/D/H
DATA INCLUDED -
EXTENSION TOOL
USED NAME
PS1 COMPENSATED NEUTRON
PS2 COMPENSATED NEUTRON
PS3 COMPENSATED NEUTRON
PS4 COMPENSATED NEUTRON
HLA COMPENSATED NEUTRON
PAGEI 3
TABLE TYPE = CONS
CN BP EXPLORATION Companx Name
FN PRUDHOE BAY F~lem
W~ P-19 W id NameName
APIN 50-029-22094-00 APl Serial Number
FL 2319' FN5 & 2057' FEL Field Location
SECT 31 Section
TOWN lin Township
RANG ~3E Rang9
COU~ ORTH SLOPE County
STAT ALASKA 8tare or Prov~nce
NAT! USA Nation
LATI Latitude
LONG Longitude
WITN C PARKER Withess'.Name
3560
Service Order Number
PDAT MSL
EPD FT 0. ~'i~erman~nt datum
Elevation. o~ Perm. Da
LMF DF bo~ .easu'red from
EDF FT 92. Elevat on o~ Derric~
EGL PT 53 ~9999 Elevation of Gr ~nd
TDD rT iO~ .6 Total Depth - D~lller
TDL FT 10235.. Total DePth - Logger
BLi rT 10232, Bottom LOg Interval
TLI FT 9745 Top Log Interval ~
DFT BRIN~ Drilling Fluid Type
DFD G/C3 9.199999 Drilling Fluid. Densit
DFP~ Drilling Fluid Ph
DrY CP Dri final Fluid Viscos
DFL F3 Drilllno Fluid boss
R~$ OHMM Resistivity of Mud Sa
MST DEaF Mud Sample Temperatur
R~F$ OHMM Resistivity of mud fi
MFST DECF Mud Filtrate Sample
TUN! VALU DEr! TYPE
ZONE
ZONE
ZONE
ZONE
ZOnE
ZONE
ZONE
Tape Verification blstinO 20-DEC-1990 i4:26 PAGE~ 4
ichlumberoer AlasKa Computing Center
TUNX VALU DEF! TYPE
R~CS OHMM ~e$1stivit¥ o~ Mud Ca ZONE
~CST DEGF Mud CaKe Sample Tempe ZONE
STE~ DEGF -20, Surface Temperature
BHT DEGF Bottom Hole Temperatu ZONE
TABLE TYPE : ZONE
TUN! BDEP TDEP DFPH
DFV DFL RMS MST
RMF$ MFST R~CS ~CST
FT 0, 0,
O, O, O. O,
O, O, O, O, .
Ol
TABLE TYPE ~ CURV
DEFI
DEPT Depth Channel Name
NPHI Neutron PoroSity
RTNR Raw Thermal Neutron Ratio
TNRA Calibrated Thermal Neut.on Ratio
RCNT RCNT
RCFT RCFT
CNTC CNTC
CFTC CFTC
G~ Gamma
TENS Tension
CCL CCh AmplitUde-.
NPH! ~eutron porosity
~NR Raw:Thermal_Neutron Ratio
R~.~T RCFT
CNTC CNTC
CFtC CFTC
GR Gamm Ray
TENS Tension
CCL CC5 AmPlitude..
NPH! Neutron Porosity
RTNR Raw. Thermal Neutron Ratio
TNRA Calibrated Thermal Neutron Ratio
RCNT RCNT
RCFT RCFT
CNTC CNTC
CFTC CFTC
ES Ta~e Verification Listing
ehlumberger Alaska Computing Center
20-DEC-lggO 14:26
PAGEI
DEFI
G~ Gamma ~av
TF, N$ Tension
CCb CCL Amplitude
NPHI Neutron Porosity
RTNR Raw. Thermal Neutron Ratio
TNR~ Calibrated Thermal .eutron Ratio
RCNT RCNT
RCFT RCFT
CNTC CNTC
CFTC CFTC
G~ Gamma Ray
TENS Tension _
CCL CCL Amplitude.
NPHI Neutron Porosity
DATA FORMAT SPECIFICATION RECORD
SET TYPE - 64EB *,*.
TYPE REPR CODE ,VALUE
0
3 73 168
4 66
5 66
6 73
? 65
9 65
11 66 6
66 0
14 65 FI
I~ 66 68
16 66 ! ~
0 66 0
** SET TYPE * CHAN **
N~ME SERV UNIT SERVICE AP1 AP1 APi APl FILE NUMB'NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP<iELEM CODE (HEX)
DEPT FT 413560 O0 000 O0 0 i 1 1 4 68 0000000000
NPHI PSI PU 413560 O0 000 O0 0 1 ! 1 4 68 0000000000
RTNR PSi 413560 00 000 00 0 1 1 1 4 68 0000000000.
TNR~ PS1 413560 O0 000 O0 '0 I 1 I 4 68 0000000000
RCNT PS1 CPS 413560 O0 000 O0 0 I I 1 4 68 0000000000
Tape Veri~icstion Listinq
chl~mberqer ~les~a Co~uti~ Center
20=DEC-1990 i4:26
PAGEI
RCF~ PS1 CPS 41356O
CNTC PS1 CPS 413560
CFTC PSi CPS 413560
GR PSi GAPI 413560
TENS PS1 h. 413560
CCh PS, ¥ 41356O
NP., PS2 PO 413560
RTNR PS2 413560
TNRA PS2 413560
RCNT PS2 CPS 413560
RCFT P$2 CPS 413560
CNTC PS2 CPS 413560
CFTC P82 CPS 413560
GR PS2 GAPI 413560
TENS PS2 LB 413560
CCL PS2 V 413560
NPH! PS3 PU 413560
RTNR PS3 413560
TNRA PS3 413560
' RCNT PS3 CPS 413560
RCFT P$3 CPS 413560
CNTC P$3 ~p$ 413560 413560
CFTC PS3 bPs
G. PS3 GAP, 413.560
TENS P53 LB 413,60
CCL PS3 V 413560
NPH? PS4 PU 4135 60
RTN, P$4 413560
TNRA PS4 413560
RCNT PS4 CPS 413560
RCFT PS4 CPS 41 3560
CNTC P$4 CPS 413560
CFTC P$4 CPS 413560
GR PS4 GAPI 413560
TENS PS4 LB 413560
NA~F SERV UNIT SERVICE API AP1 AP1 APl FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
ooooo ooo, , , ~ ~ oooooooooo
ooooo ooo, , , ~ ~ oooooooooo
ooooo ooo, , , ~ ~ oooooooooo
ooooo ooo, , , , ,,oooooooooo
ooooo ooo, ~
, . ~,oo ooooooo
o
ooooo ooo, , , , ~,oooooooooo
ooooo ooo, , , , ~,oooooooooo
ooooo ooo, , , , ~,oooooooooo
ooooo ooo, , , , ~,oooooooooo
ooooo ooo, , , , ,,oooooooooo
oo
ooo ooo, , , , ,,oooooooooo
ooooo ooo, ,', , ~,oooooooooo
ooooo ooo, , ~ , ~,oooooooooo
ooooo ooo{ + . ~ ~ ~~~o
ooooo ooo, ~ i , ~,~~vO
ooooo ooo~ ~ ~ , 6,oooooooooo
ooooo ooo~ , ~ , ,,oooooooooo
ooooo ooo~ , ~ , 6,oooooooooo
ooooo ooo~ ~ , , ~,oooooooooo
ooooo ooo~ , , ,
ooooo ooo, , , ~ ~
68
0000000000
· 0000000000
oo ooo ooo , , . , ~, oooooooooo
oo ooo ooo , , , ~ ~ oooooooooo
cc~ ,54 ~ ~)~ oo ooo oo o ~ ' ' ~ ~ o~ooooooooo
000000000
· 560 00 000 00 0
DATA
DEPT
RCNT
G~
RTNR
CNTC
CCI,
RCNT
GR
RTNR
10279
PSi -999
PS1 -999
PS2 -999
P$2 -999
PS2 -999
PS3 -999
PS3 -999
PS4 -999
500 NPHI,PSl -999
250 RCFT,PSi -999
250 TENS.;PSI -999
250 TNRA'PS2 -999
~0 CFTC,PS2 -999
0 NPHi.PS3 -999
250 RCFT,PS3 -999
250 TENS,PS3 -999
250 TNRA.PS4 -999
250
250
250
250
2'50
250
250
RTNR PSi
CNTC PS1
CCh PSi
RCNT PS2
GR P$2
RTNR PS3
CNTC PS3
CCL,PS3
RCNT,PS4
~999
.999
-999
-999.
,999:
-999
-999
-999
-999
,250 TNRA
,.250 CFTC
250 NPHi
250 RCFT
250 TENS
250 TNRA
250 CFTC
250 NPHI
250 RCFT
,Psi
PS
PS
PS
,PS2
'g99,
-999
-999
.-999
-999
-999
-999
-999
-999
250
250
~$0
'3O
IS Tape verification bisting
.chlumberqer AlasKa Computing Center
CNTC.P$4 -999,250
CC[,,PS4 -999,250
DEPT
RCN? PSt
GR PSi
RTNP PS2
CNTC PS2
CCL PS2
RC~T PS3
G~ PS3
RTN~
CNTC PS4
CCL PS4
DEPT,
RCNT.PS1
GR
RTN~ P$2
CNTC PS2
COL PS2
RCNT PS3
GR PS3
RTN~ P84
C~T¢ PS4
CCL P84
DEPT,
RCNTePS1
GR.PS~
RTNR,P82
CNTC,PS2
CC5.PS2
RCNT;PS3
G~,PS3
RTNR~PS4 ,
CNTC,P84
CCt,;PS4
DEPT
~CNT
CNTC PS2
CCL PS2
~CNT
GR PS3
RT~ PS4
CNTC PS4
CCL PS4
DFPT
RCNT!PS1
RTNR PS2
10200 000
4253 578
13 773
3 534
4450 417
0 O00
4306 483
18 172
3 649
4582 714
0,000
395i 277
0 000
4 9
0 000
10000,000
3860,94'0
4099 075
0 000
4 357
3955 244
'2 701
9900 000
3722 449
43 500
3 288
3896 855
0 000
3992
42 375
3 545
3751 992
0 000
9800,000
8112,225
42,406
1.764
CFTC.PS4
NPHI.HLA
NPHI.PS1
RCFT,PSI
TENS,PS1
TNRA.P$2
CFTC,PS2
NPHI,P$3
RCFT,PS3
TENS.PS3
TNRA,PS4
CFTC,PS4
NPHI.HLA
NPHI. PSi
RCFT
TENS PS1
TNRA P$2
CFTCPSps~
NPHI
RCFT PS3
TENS PS3
TNRAPS4
CFTC PS4
NPHI MbA
NPH I, PS i
RCFT.,PS[
TENS PS'I
TNRA~ PS2
CFTC PS2
NPHI P$3
RCFT PS 3
TENS PS 3
TNRA PS4
CFTC P$4
NPHI HLA
NPHi~PSI
RCFT,PS
TENS PS
TNRA P8~
CFTC PS 2
NPHI PS3
RCFT P$3.
TENS PS3
TNRA PS4
CFTC PS4
NPHI ~5A
RC'FT.PS1
TENS.PSi
TNRA.PS2
20-DEC-1990 14:26
'999.250 GR,PS4
0,000
20 559
1200 000
2284 000
3 765
ll~ 887
865
I
000
o g54
28 125
883 436.
943 0~6
2.310 000
8444 657
899
27 295
.24,787
2~66,667
40,000
4 458
2324 0 0
4 2
451
O98
19 78
tt38
228~ 000
?07
~066 $89
O27
1152 000
2260
000
99~ 992
543
19 873
6,~87
O4
22 1,870
RTNR.PS1
CNTC,PS!
CCh,PS[
RCNT,PS2
GR,PS2
RTMR~PS3
CNTC.PS3
CCL.PS3
RC~T,PS4
~R.PS4
CN~ PSi
C( PSi
ECl P$2
RTl PS2
PS3
CN PS3
C PS3
RC PS4
PS4
RTt PS
C] PSI
Ri PS2
PS2
RTNR~ PS 3
CN~;C' PS3
CCh,PS3
· * P84
RTe',PS1
CN~ ,PS~
CC' PS2
RCN~ PSi
GR PS2
R?NR P83
CNTC PS3
cch PS3
RCN~ PS4
GR PS4
RTNR,p$1
CNTC' PS 1
CC5, PS 1
RCNT, PS2
-999.250 TENS.PS4
3 556 TNRA,PS1
4469 084 CFTC.PSi
0
4277
18
3
4476
O.
4473.
22
000 NPHX.P$2
551 RCFT.P$2
922 TENS,PS2
680 TNRA,PS3
399 CF?C,PS3
000 NP~I,PS4
-469 RCFTePS4
063 TENS'PS4
4 630 TNRA.,PS1
3830 549 CFTC,PS1
PS
0, 000 NPH!'pS22
3719 438 RCFT.
3624
16
TNRA,PS.
00 CFTC,
NPH~,
90 RCFT,P$4
69 TENS,PS4
4
4024
0
1¢
4015.
, 0
3820,
17
CFTC PSl
000 NP~I.
· 000 RCFT
984 TENS
200 TNRA
805 CFTC
000 NPM!
408 RCFT
063 TENS
PS2
PS
0
3783
41
3
3949
0
3795
46
2~8
CFTC.PS!
ooo
,567 RCFT,P
PS
844 TENS bs~
306 TNRA~
386 CFTC PS3
000 NPH! P84
501 RCFT PS4
:656 TENS PS4
828 '000
7887 "775
TNRA.PS1
CFTC.PS
NPHX,,PS
RCFT,P82
PAGEI 7
'999,250
82
3"981
1137.
2290.000
~.;e69
1142,977
1210,634
2384,000
855
2350
4 599
86
959
2354 000
4,~90'
919~9i4
25,,307
945,892
2334,'000
4.3~9
934,.S53
25,964
23 ~, O0
1168,
2244:.000
1077,55
2284,00~
IS Ta~e Verification Listing
chlumberqer Alaska Computing Center
CNTC PS2 8171.712 CFTC.PS2
CCL:PS2 0.000 NPHI,P$3
RCNT,PS3 7951,903 RCFT,PS3
G~,PS3 44,625 TENS,PS3
RTNR,PS4 t 708 TNRA,PS4
CNTC,P$4 8361:i95 CFTC,PS4
CCL.PS4 O.000 NPHI'HLA
DEPT
RCNT
CNTC
CCL
RCNT
RTNR
CNTC
CCL
PS2
PS2
P$4
PS4
PS4
9735 500
-999
-999250
-999 250
-999 250
-999 0
-999 0
-999 250
-999 250
NPHI.PSI
RCFT.PS1
TENS.PS!
TNRA,PS2
CFTC,PS2
NPHI,PS3
RCFT,PS3
TENS, PS3
TNRA,PS4
CFTC,PS4
NPHI,HbA
END OF DATA
20-DEC-1990 14=26
4112,600
6 104
4479 371
2244 000
! 844
4390 650
6 152
-999,250
-999,250
-999,250
-999,250
-999o250
-999;.50
-999.~50
-999 250
-999 250
250
-.99~ 000
GR.P$2
'RTNR,PS3
CNTC,PS3
COb,PS3
RCNT,PS4
GA,PS4
RTNR.P$1
CNTC,PS!
CCL,P81
RCNT,PS2
GA,PS2
RT'NR,P83
CNTC.P$3
,P84
GA,P84
46.313 TENS.PS2
! 705 TNRA.,P83
8255:592 CFTC'PS3
0.000 NPHI P$4
8195.918 RCrT!PS4
40,281 TENS P$4
-999.250
-999
-999:
-999
-999
-999:
~999,
"999
-999
-999
NPNI,P$2
250 RCrT.,P$2
250 TENS,PS2
, 50 TNRR,P83
~50 CFTC,PS3
250 NPHI,PS4
250 RCFT,PS4
250 TENS,PS4
PAGE."
2250,000
2274,000
.,
-999
-999 150
-999 150
'-999
-999
-9
250
-999 250
**** FILE TRAILER
FILE NAME = EDIT .O01
SERVICE = FLIC
VERSION : 001A06
DATE , 90~2/20
MaX PEC SIZE ." 10 '
FILE TYPE : LO
LAST FILE
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 90/t2/20
ORIGIN = FLIC
~PE NAME , 74249
NTINUATION # I 1
PREVIOUS TAPE =
COMMENT = BP ExpLORATION,PRUDHOE BAY,P-i9,50-029-22094~O0
**** REEL TRAILER ****
SERVICE NAME = EDIT
DATE : 90/12/20
ORIGIN = rbIC
REEI, NA~E . = 74249
CONTINUATION # ~
PREVIOUS REEL =
CO~ENT ~ BP EXPLORATION,PRUDHOE BAY,P-lg,50-029-22094-O0