Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-051David Douglas Hilcorp Alaska, LLC Sr. GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: Date: 01/23/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL Well Name PTD Number API Number W-201 201-051 50-029-23007-00-00 Definitive Directional Surveys (Composited) - Gyrodata Re-Survey 12/17/2024 Main Folder Contents: Please include current contact information if different from above. 201-051 T39990 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.01.23 13:58:32 -09'00' Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 02/09/2024 Mr. Mel Rixse Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 02/09/2024. Dear Mr. Rixse, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 02/09/2024. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki DN: cn=Oliver Sternicki, c=US, o=Hilcorp North Slope LLC, ou=PBU, email=oliver.sternicki@hilcorp.com Date: 2024.02.09 11:15:58 -09'00' Oliver Sternicki Hilcorp North Slope LLC. Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-off Report of Sundry Operations (10-404) 02/09/2024 Well Name PTD # API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date L-293 223020 500292374900 30 8/29/2023 S-09A 214097 500292077101 2 9/19/2023 S-102A 223058 500292297201 2 9/19/2023 S-105A 219032 500292297701 10 9/19/2023 S-109 202245 500292313500 7 9/19/2023 S-110B 213198 500292303002 35 9/19/2023 S-113B 202143 500292309402 10 9/19/2023 S-115 202230 500292313000 4 9/19/2023 S-116A 213139 500292318301 4 9/19/2023 S-117 203012 500292313700 3 9/19/2023 S-118 203200 500292318800 9 9/19/2023 S-122 205081 500292326500 5 9/19/2023 S-125 207083 500292336100 2 9/19/2023 S-126 207097 500292336300 3 9/19/2023 S-134 209083 500292341300 35 9/19/2023 S-200A 217125 500292284601 7 9/19/2023 S-202 219120 500292364700 13 9/19/2023 S-210 219057 500292363000 10 9/19/2023 S-213A 204213 500292299301 4 9/19/2023 S-215 202154 500292310700 3 9/19/2023 S-216 200197 500292298900 4 9/19/2023 S-41A 210101 500292264501 3 9/19/2023 W-16A 203100 500292204501 2 9/23/2023 W-17A 205122 500292185601 3 9/23/2023 Well Name PTD #API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date W-19B 210065 500292200602 8 9/23/2023 W-21A 201111 500292192901 8 9/23/2023 W-32A 202209 500292197001 4 9/23/2023 W-201 201051 500292300700 44 9/23/2023 W-202 210133 500292343400 6 9/23/2023 W-204 206158 500292333300 3 9/23/2023 W-205 203116 500292316500 3 9/23/2023 W-207 203049 500292314500 3 9/23/2023 W-211 202075 500292308000 8 9/23/2023 W-213 207051 500292335400 3 9/23/2023 W-214 207142 500292337300 10 9/23/2023 W-215 203131 500292317200 2 9/23/2023 W-223 211006 500292344000 7 9/23/2023 Z-69 212076 500292347100 2.0 27 1.5 10/24/2023 S-128 210159 500292343600 11 12/27/2023 S-135 213202 500292350800 16 12/27/2023 V-113 202216 500292312500 24 12/31/2023 V-114A 203185 500292317801 5 12/31/2023 V-122 206147 500292332800 5 12/31/2023 V-205 206180 500292333800 2 12/31/2023 V-207 208066 500292339000 8 12/31/2023 V-214 205134 500292327500 5 12/31/2023 V-215 207041 500292335100 2 12/31/2023 V-218 207040 500292335000 5 12/31/2023 V-224 208154 500292340000 16 12/31/2023 V-225 209118 500292341900 6 12/31/2023 V-01 204090 500292321000 3 1/1/2024 V-02 204077 500292320900 5 1/1/2024 V-04 206134 500292332200 5 1/1/2024 V-102 202033 500292307000 8 1/1/2024 V-104 202142 500292310300 5 1/1/2024 V-220 208020 500292338300 4 1/1/2024 W-201 201051 500292300700 44 9/23/2023 e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F: \LaserFiche\CvrPgs _ Inserts\Microfilm_ Marker. doc Permit to Drill 20'105'10 l j,j DATA SUBMITTAL COMPLIANCE REPORT 614/2003 Well Name/No. PRUDHOE BAY UN POL W-201 Operator BP EXPLORATION (ALASKA) INC APl No. 50-029-23007-00-00 MD 10343 ~-~ -I-VD 5323 -~ Completion Dar 6/9/2001 ~ Completion Statu 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log N._~_o Sample N__~o Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type ,_,~l~e d i a Fmt ~ D ~ See Notes (data taken from Logs Portion of Master Well Data Maint) Interval Log Log Run OH I Dataset Name Scale Media No Start Stop CH Received Number Comments Lo i Lo Lo Lo Directional Survey 10355 LIS Verification 10335 MWD -S-m'vey Directional Survey IFR Survey ~[~ ,U I.~Lr. asonic Imaging 5 Tool/Cement ~ Production P,,.~roduction ,,4:Y6 Production 4P~r,e'~roduction Pro Production Spi Spinner 1'~ Te Temperature Pre Pressure Cai Caliper log 2 Blu 2 Blu 2 Blu 2 Blu 2 Blu 1 6448 7241 Case 1/23/2002 ,'~10534 Coil Flag 43 10288 Open 9/27/2001 '~0335 43-10288 FINAL OH 6/19/2001 MWD Survey, Paper Copy FINAL 2801 10240 oh 10/4/2001 f,~r0355 2801-10240 Digital Data FINAL 43 10288 OH 9/27/2001 43-10288 LIS Verification FINAL 43 10288 oh 9/27/2001 '-'~0335 43-10288 Digital Data FINAL OH 6/19/2001 MWD Survey, Digital Data FINAL CH 6/19/2001 Directional Survey, Paper Copy FINAL OH 6/19/2001 IFR Survey, Digital Data FINAL 2859 7160 CH 7/13/2001 2859-716(~Sel~a- 1 6846 7518 ,Case 9/23/2002 ~/11015 1 6846 7518 Case 9/23/2002 1 6987 7520 Case 9/25/2002 ,.-' 11020 1 ~6eJ8~7 7520 Case 9/25/2002 1 6848 7516 Case 9/13/2002 1 ~ase 9/13/2002 . 1 6848 7516 Case 9/13/2002 1 6848 7516 Case 9/13/2002 I 6848 7516 Case 9/13/2002 Well Cores/Samples Information: Permitto Drill 2010510 MD 10343 TVD Name DATA SUBMITTAL COMPLIANCE REPORT 61412003 Well Name/No. PRUDHOE BAY UN POL W-201 Operator BP EXPLORATION (ALASKA) INC 5323 Completion Dat 6/9/2001 Completion Statu 1-OIL Current Status 1-OIL Interval Dataset Start Stop Sent Received Number Comments APl No. 50-029-23007-00-00 UIC N ADDITIONAL INFORMATION Well Cored? Y / ~ Chips Received? ~ Analysis ~ R ~.c~.ive. d ? Daily History Received? ~.~N Formation Tops ~/N Comments: Compliance Reviewed By: Date: WELL LOG TRANSMITTAL II. ProActive Diagnostic Services, Inc. 0/-05 / To: State of Alaska A~ 333 W. 7~Street Suite # 700 Anchorage, Alaska 99501 RE' Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Joey Button / Jeni Thompson ProActive Diagnostic Services, Inc. P. 0. Box 13S9 Stafford, TX 77497 BP Exploration [Alaska}, Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT[S] OR CD-ROM FILM COLOR Open Hole I I 1 W-201 8/23/02 Res. Eval. CH I I 1 Mech. CH 1 Caliper Survey Signed' Print Name: Date · ProActive DiagnosTic Services, Inc., 310 K Street Suite 200, Anchorage, AK 99501 ?hone:(90?) 245-~9S ! ~'a×:(~0?) 245-$9~2 ~,-~edl: pd$~nChm'a~¢~¢~o~lo~.¢o~ WCb$j~¢: ~v~v.mCmo~%~.com WELL LOG TRANSMITTAL I~" ProActive Diagnostic Services, Inc. To~ State of Alaska Aor~c 333 W. 7~Street Suite # 700 Anchorage, Alaska 99501 RE' Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LoG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT[S} OR CD-ROM FILM COLOR Open Hole I 1 1 W-201 8/22/02 Res. Eval. CH 1 1 1 Mech. CH 1 , Caliper Survey Signed' Print Name: Date · ProActive Diagnostic Services, Inc., 310 K Street SuiTe 200, Anchorage, AK 99501 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage~memorylog.com Website: www.memorvlog, com 09/03/02 Schlumberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth NO. 2386 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris Well Job # Log Description Date Color Sepia BL CD W-201 ' ~-~ O )-O.~ ! MPSPIPPROFILE 08/23102 i -- _ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: RECEIVED SEP 13 2002 ~a~_. ~'~ & Gas Cons. Commission Anchorage Schlumberger DCS 3940 Arctic Blvd Suite 300 Anchorage AK 99503-5789 ATTN: Beth R eceive~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _X Plugging_ Perforate _X ADD PERFS / FRAC WELL Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~le, AK 99519-6612 4. Location of well at surface 450' FNL, 1177' FEL, Sec. 21, T11N, R12E, UM At top of productive interval 2690' FNL, 1145' FEL, Sec. 15, T11N, R12E, UM At effective depth 2690' FNL, 1145' FEL, Sec. 15, T11N, R12E, UM At total depth 2385' FNL, 16' FEL, Sec. 15, T11N, R12E, UM 5. Type of Well: Development __X Exploratory__ Stratigraphic__ Service__ ~sp~ 612049, 595980~ (asp's 616020, 5962534) (asp's 617307, 5962927) ~sp~ 618431, 5963249) 6. Datum elevation (DF or KB feet) RKB 81 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-201 9. Permit number / approval number 201-051 / 301-342 10. APl number 50-029-23007-00 11. Field / Pool Prudhoe Bay Field / Polaris Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2845' Intermediate 7712' Liner / Slotted 2775' 10343 feet Plugs (measured) 5323 feet 9171 feet Junk (measured) 5252 feet Size Cemented Measured Depth True Vertical Depth 20" 260 sx AS (Aprrox) 139' 139' 9-5/8" 444 sx ASII, 273 sx 'G' 2874' 2672' 7" 494 sx Class 'G' 7738' 5222' Slotted Liner / 235 sx 4-1/2" 7568' - 10343' 5203' - 5322' Class 'G' Perforation depth: measured Open Perforates 7090'-7092', 7300'-7302', 7490'-7492', Slotted Liner 7718'- 9040' true vertical Open Perforates 5061 '-5062', 5138'-5139', 5189'-5189', Slotted Liner 5~2!i~..- 524.1' ' '~'"' ~'" Tubing (size, grade, and measured depth) 3-1/2" 9.3¢ Baker S-3 Packer @ 6162' MD. Packers & SSSV (type & measured depth) 7" x 3-1/2" Baker S-3 Packer ~ 6162' MD. 3-1/2" HES 'X' Nipple e 2100'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation Shut-In Subsequent to operation 01/20/2002 Representative Daily Avera.qe Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 1177 416 131 285 15. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations __ 16. Status of well classification as: Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~ ,~~)~,,~ Title: Technical Assistant DeWayne R. Schl'~orr ~ Form 10-404 Rev 06/15/88 · Date August 22, 2002 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE 12/07/20O 1 12/08/2001 1 2/10/2001 12/11/2001 12/12/2001 12/12/2001 12/13/2001 12/14/2001 12/15/2001 12/15/2001 12/17/2001 12/17/2001 12/18/2001 12/21/2001 12/22/2001 12/23/2001 12/23/2001 12/27/2001 12/28/2001 12/29/2001 12/30/2001 12/30/2001 01/14/2002 01/16/2002 01/17/2002 12/07/01 12/08/01 12/10/01 12/11/01 W-201 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS FRACTU RI N G FRACTURING FRACTURING FRACTURING FRACTU RI N G FRACTURING FRACTU RI N G FRACTURING FRACTU RI N G : SET SPMG (PRE FRAC) IN PROGRESS : INSTALL SPMGS-MIT (PRE FRAC) : PRE FRAC SLOI-I-ED LINER SAND PACK : SAND DUMP/ADD-PERF : SAND DUMP -- ADPERF · . O-D SAND FRAC : FCO/PERF (PRE-FRAC) : DRIFT & TAG (POST FCC) : OB-C FRACTURE FRACTURING: MIT IA TO 3500 PSI DRILL-POST WORK: C/OUT SPMG AT ST#1 (PRE FRAC) FRACTURING: LEAK DETECTION LOG DRILL-POST WORK: C/OUT PETREDAT SPM GAUGES AT ST#1 & ST#2 FRACTURING: FCC / SRT / ACID / PERF FRACTU RING: FRACTU RING: FRACTU RI N G: FRACTU RING: FRACTU RI N G: FRACTURING: FRACTURING: FRACTU RING: FRACTURING: FRACTU RING: FRACTU RING: FCC FCC HYD FCC FCC / SRT / ACID / PERF / PERF RAULIC FRAC SCHRADER OBA SAND PULL SPMG'S, INSTAL NEW G/L DESIGN HOT OIL TUBING INSTALL NEW GASLIFT DESIGN FCC W/TEST SEP. FCC FCC EVENT SUMMARY DRIFTED WITH 2.5" CENTRALIZER. OVERCOME BY DEVIATION AT 7529' WLM. SET CATCHER. PULLED OGLV FROM STA #1, DGLV FROM STA #2 & LGLV FROM STA #3. SET DGLV IN STA #3.SET PETREDAT SPMG IN STA #2. BEGIN PUMPING WITH LRS TO FLUID PACK IA. SET PETRADAT SPM IN ST # 1. MIT IA TO 4000#. BLEED BACK TO 1000#. PULL CATCHER SUB. PRE FRAC SLOTTED LINER SAND BACK. PUMP 20 BBL 60# HEC SPACER, 36 BBLS 8PPA C-LITE AND 36 BBLS 20/40 RIVER SAND, FLUSH W/40 BBL 60# HEC AND 30 BBL SLICK WATER. PRESSURE INCREASED TO 2300 PSI. HESITATE PUMP OVER NEXT 3 HRS TO BRIDGE SAND, FINAL PRESSURE 3000 PSI @ 3 BPM. TURN OVER TO CTU TO DRESS OFF SAND TOP. RIH W/2.25" JS NOZZLE. TAG AT 7577' (LINER OR SAND TOP) - GET INJECTIVITY OF 1700 PSI AT 0,8 BPM. DUMP 2-1200# 20/40 SAND & 200 # 100 MESH SAND, TAG AT WHAT APPEARS TO BE TOP OF LINER, FINAL Page I 12/12/01 12/12/01 12/13/01 12/14/O 1 12/15/O 1 12/15/01 12/17/01 12/17/01 12/18/01 W-201 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS MU BAKER MHA AND MEMORY LOGGING TOOLS. RIH AND LOG TIE IN FROM 7530 TO 6500. TURN WELL OVER TO 2% KCL. RI W/SWS PERF GUNS: 2 1/2" HSD 6 SPF. 2 GUNS FOR SHOOTING ACROSS SAME INTEREVAL: >>>7,490' - 7,492'<<<. SHOOT 1ST GUN USING HYD. DELAY FIRING HEAD, DROP BALL AND FIRE 2ND GUN.----POSITIVE INDICATION ON BOTH GUNS. POST SHOT INJECTIVlTY: 2.5 BPM @ 1500 PSI. FRAC'D SCHRADER OB-D SANDS WITH YF125LG SYSTEM AND 290,883# OF 16/20 C-LITE. PLACED 284,570# BEHIND PIPE, LEFT 6313# IN CSG. EST TOS- 7300', WELL FP'D TO 3000' WITH DIESEL. MAX TREAT 3600 PSI, AVG TREAT= 3000 PSI. LOAD TO RECOVER IS 1320 BBLS. TREESAVER CUPS RECOVERED. RIH AND TAG TOP OF SAND AT 7201 CTMD. CLEAN OUT TO 7400 CTMD. LAY IN NON-SLK 2% KCL ACROSS LINER. CONDUCT INJECTIVITY TEST PER TOWN ENG: 0.7 BPM @ 1270 PSI WHP. RIH W/2.5" PERF GUN. SHOOT 7300'- 7302' AT 12 SPF W/35B UP CHARGES. POOH. ASF. FP WELL TO 2500' WITH 60/40 MW. FINAL INJECTIVITY = 0.8 BPM @ 2800 PSI. RDMO. **LEFT WELL SHUT-IN PENDING FRAC** DRIFTED TUBING W/2.5" CENTRALIZER, TTL AND SAMPLE BAILER TO 7058' SLM, APPEARED TO BE DEVIATION. RUN A 5' 2.5" PUMP BAILER TO 7055' SLM AND BRING BACK A SMALL AMOUNT OF FRAC SAND. BELIEVE S/D IS DUE TO THE COMBINATION OF DEVIATION & LIGHT AMOUNT OF FRAC SAND ON LOW SIDE. - WELL LEFT SHUT IN. ATTEMPTED TO FRAC OB-C SANDS, NOTICED TBG X IA COMMUNICATION DURING RIG UP (+-8 GPM @ 3500 PSI). COULD NOT BREAKDOWN PERFS TO ESTABLISH FRAC RATES OVER 4 BPM UNDER 8400 PSI. FREEZE PROTECTED TBG WITH 25 BBLS DIESEL. MIT IA TO 3500 PSI FAILED 1850/1950/60 SET X-LOCK C-SUB AT 6125'SLM. MIRU ELINE, RIH WITH PRESS/TEMP/FBS/CFS/GRAD FOR LEAK DETECT LOG. LOG BASELINE DN 120 FPM FROM SURFACE TO 100' BELOW TT. (NO TAG) PUMP 30 BBLS CRUDE DN IA AT 0.25 BPM, IA = 3400 PSI, LOG UP AND FIND LEAK IN LOWER GLM (6058') LOG STOP COUNTS ABOVE AND BELOW TO VERIFY. LOG 120 FPM OUT OF HOLE, NO OTHER LEAKS SEEN ON LOG, POOH, RDMO ELINE. PULLED RK-SPMG FROM ST#1 (BTM PKG WASHED OUT). PULLED RK-SPMG FROM ST#2 (PKG LOOKED GOOD). SET PETREDAT SPM GAUGES AT ST#1 AND ST#2. LEFT WELL S/IN, PRE-FRAC. Page 2 12/21/01 12/22/O 1 12/23/O 1 12/2 3/O 1 W-201 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS PULLED CATCHER. PT IA TO 3500 PSI. FOR 30 MIN. START 3500 PSI END 3350 PSI. RETEST TO 3500 PSI FOR 30 MIN. START 3550, END 3540 PSI *** LEAVE WELL SHUT IN FOR FRAC *** RIH TO FCO WITH 2.5" JSN TAG SAND AT 7262' CTD, FCO TO 7400' CTD, PARK AT TTAIL FOR SRT. SRT DOWN COIL = (0.5 BPM@ 17OO PSI, AND 1 BPM @ 2500 PSI). RBIH DRY TO TAG SAND TOP AT 7402' CTD, PUH TO 3000' CTD FOR SRT DOWN BSIDE = (3.6 BPM @ 2840 WHP, FINAL = 2.6 BPM @ 2900 WHP). PUH TO SURFACE SRT = (3.3 BPM @ 3300 WHP). RBIH TO TAG SAND HIGH AT 7286' CTD, FCO WITH 3# BIOZAN AND CHASE TO SURFACE. RBIH TO DRY TAG AT 7414' CTD, PUH TO ESTABLISH INJECTION 1.1 BPM @ 2100 WHP, STAGE 9 BBLS 15 % HCL ACID TO NOZZLE. ACID TREAT WITH 9 BBLS OF 15 % HCL FROM 7300' CTD TO 7302' CTD, 100 PSI WHP DROP WHEN ACID HIT PERFS, FINAL INJ AFTER ACID- 1.2 BPM @ 2100 PSI, POOH. RIH WITH PDS MEM GR/CCL TOOLS TO A LIGHT TAG AT 7425' CTD, LOG UP TO FLAG DEPTH OF 7250' CTD, LOG UP TO 6450' CTD, POOH MAINTAINING 600 WHP. MU 2.5" HSD 34B UP BH GUNS. RIH TO FLAG DEPTH, CORRECT TO TOP SHOT. RIH TAG SAND AT 7250'. POOH.. BO GUNS, RIH W/2.5 JS NOZZLE. FCO TO 7410', LAY IN 3 BBLS BIO, POOH @ 60 % IN LINER, 80 % IN TUBING. RBIH WITH PERF GUNS TO TAG HIGH AT 7055' CTD, BRING PUMP ON, WORK DOWN TO 7084' CTD. TAG WITH PERF GUNS AT 7055' WORK DOWN TO 7129' CTD. DECISION MADE TO ABORT LOWER PERFS. PERF 7090'-7092' 12 SPF WITH (2.5" HSD 34B UP BH 6-SPF HDF/CBF) , INJECTION TEST 2 BPM- 2200 PSI, 2.5 BPM-2300 PSI, 3 BPM-2450 PSI, 3.5 BPM- PSI CLIMBED TO 3500 PSI, BACK RATE DOWN TO 2 BPM AND 3075 PSI. SHUT DOWN PUMP LET WELL BLEED TO 1000 PSI SHUT IN SWAB, 20 BBLS METH PUMPED. ***WELL SHUT IN AND FREEZE PROTECTED FOR FRAC*** FRAC OBA FM. LAST INJECTION POST COIL TCP WAS 2.3 BPM @ 3100 PSI. START DH W/BD. PUMPED 54 BBLS 25# SLICK WATER @ 16 BPM 6400 PSI. TREE SAVER CUPS GAVE UP. SD AND REPLACED CUPS. STARTED DH W/100 BBL YF125LG DATA FRAC @ 15 BPM AND 5137 PSI. SD FOR PRESSURE ANALYSIS. CLOSURE EST @ 14.7 MIN 53% FLUID EFF. REDESIGNED FRAC. Page 3 12/27/O 1 12/28/O 1 12/29/01 12/30/01 12/3O/O 1 01/14/02 01/16/02 W-201 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS START DH WITH 15 BBLYF125LG PAD @ 15 BPM @ 4170 PSI. STEP FROM 1 TO 12 PPA 16/20 C-LITE PROP AVG RATE=15 BPM AVG PSI= 3000 PSI. LAST STAGE INCREASE PROP CON TO 14 PPA OF 16/20 RCP POLAR PROP WITH ACTIVATOR. PUMPED 59 BBLS BEFORE NEAR WELL BORE SCREEN OUT. NO RCP BEHIND PIPE. PLACED 95786# BEHIND PIPE WITH 12 PPA @ PERFS. LEFT 33912# IN PIPE (29696# OF 14 PPA RCP IN PIPE). FLUSHED WH W/ DIESEL AND INJECTED 1.3 BBLS DOWN WELL. WELL LEFT SHUT IN, WRAPPED WITH A HEATER. FCO JET FRAC SAND FROM 290' ENCOUNTER VARIOUS ICE BRIDGING TO 1000' CTD, CONTINUE TO FCO TO TAIL SWEEP CLEAN, REVERSE 7" TO 7300', START TO LOSE FLUID TO FORMATION SWAP BACK TO JETTING WITH SLK 2% AND HEC GEL PILLS, FCO TO 7855' PUH AND APPEARS FRAC SAND CAME IN FROM PERFS ABOVE NOZZLE, STARTED LOSING RETURNS TO THE FORMATION. HANGING UP @ 7730'. WORK COIL & PUMP RATES, WORK TO 6400'. FCO FROM 7855' CTD, PULLING WT FROM BOTTOM, BROKE FREE @ 5961' CTD, POOH TO SURFACE, RBIH TO FCO TUBING TO 6250' CTD, WASHING GLMS WITH HEC GEL AND 2% KCL. FREEZE PROTECT TBG W/60/40 MEOH TO 2500'. --WELL LEFT SI-- SET 3.813 X- KEYED CATCHER @ 6166' WLMD -- PULL SPMG'S FROM GLM'S 1 & 2 -- PULL DGLV FROM GLM # 3 -- SET LGLV IN GLM # 3 ( 16/64" PORT W/ 1854 PRESS. ) PUMP HOT CRUDE TO WARM UP WELL BORE. SET DGLV IN STA.# 2 @ 5856' WLM -- SET S/O GLV ( 20/64" ORIFICE ) IN STA.# 1 @ 6044' WLM -- PULL 3 1/2 CATCHER SUB FROM X-NIPPLE @ 6166' WLM ****LEFT WELL SHUT IN**** MIRU CTU #3 & APC TEST SEPARATOR. CLEAN OUT FRAC SAND THROUGH SEP. TO WELL W-200 FROM 6,500' - 7550' WITH 2% KCL AND HEC GEL. NOTE: ICE IN CELLAR, SUSPECT IA X OA COMM? LEAVE WELL FLOWING THROUGH APC TEST UNIT @ 1.5 MM AL RATE. MIRU DS CTU #3. PERFORM WEEKLY BOP TEST. RIH WITH 2.14" JS NOZZLE. 01/17/o2 RIH JETTING TO 7550'. SWEEP WITH 5 BBLS HEC GEL. PUH PULLED HEAVY, ERRATIC WEIGHT AND COIL PRESSURE. CONT' TO PULL EXTREMELY HEAVY. WELL PRODUCING LARGE QUANTITIES OF SAND. POOH TO MONITOR PRODUCTION. WELL UNSTABLE BUT SAND PRODUCTION Page 4 W-201 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 01/17/02 (CONTINUED) DIMINISHED. RBIH. ERRATIC WT. AT 7000', PUH CLEAN OUT FROM 6500' TO 7550' AGAIN WITH 7 SWEEPS OF HEC. CHASE INTO TBG, PUMP BU AND GET HEAVY SOLIDS FOR 15 MINUTES. ABORT CO OF LINER, RIH, PUMP 75 BBLS HEC AND DO FINAL CO TO 7550' CTD. POOH AT 60 %. NO SOLIDS RETURNED. FREEZE PROTECT COIL. TURN WELL OVER TO APC TEST SEPERATOR. JOB COMPLETE. FLUIDS PUMPED BBLS 1 PRESSURE TEST LUBRICATOR W/1 BBL OF DIESEL, (1 TEST) 176 NEAT METHANOL 571 60/40 METHANOL WATER 175 DIESEL 432 DEAD CRUDE 1141 2% KCL WATER 3050 2% SLICK KCL WATER 2063 2% EXTRA SLICK KCL WATER 1410 2% DOUBLE SLICK KCL WATER 120 SLICK WATER 1290 GEL WATER 9 15% HCL ACID 50 HEC 80 60# HEC 155 HEC GEL 140 70# HEC GEL 72 8 PPA C-LITE/RIVER SAND 60# HEC SLURRY 40 BIOZAN 141 3# BIOZAN 224 L-64 FW 702 F/W +2 GPT L64 CLAY STABILIZER 12042 TOTAL ADD PERFS THE FOLLOWING INTERVALS WERE PERFORATED USING 2-1/2" HSD 34B BIG HOLE, 12 SPF (INTERVALS WERE PERFORATED TWICE USING 6 SPF GUNS), 60 DEGREES PHASING, RANDOM ORIENTATION. 12/23/2001 7090' - 7092' 12/13/2001 7300' - 7302' 12/12/2001 7490' - 7492' Page 5 WELL T ANSMITTAL ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7~Street Suite # 700 Anchorage, Alaska 99501 RE' Distribution- Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT{S) OR CD-ROM FILM COLOR Open Hole I 1 1 Res. Eval. CH 1 I 1 W-201 12/22/01 Mech. CH I --. Caliper Survey Signed · Print Name: Date · RECEIVED JAN 2 2002 Alaska Oil & Gas Cor, s. Commi~,~ion Anchorage ProActive Diagnos'~ic Services, INC., 3'10 K Street SUiTe 200, Anchorage, AK 99501 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage(L~memoryiog.com Website: .w__w_~,_.~.e_!!!Or_y~io_g..c.gJ]3. 01 / 14~02 Sc#lumberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 All'N: Sherrie NO. 1720 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris,Borealis, Midnight Sun Well Job # Log Description Date Color Sepia BL CD W-201 c:~JO/-C),~.~ / LEAK DETECTION LOG 12/17/01 1 ] Z-101 ,:::::~00-/~,~ PRODUCTION PROFILE 12/23/01 1 1 E-104 ~..C)/----,~O _~ 21524 USIT 12/11/01 2 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: RECEIVED 2O02 Schlumberger DCS 3940 Arctic Blvd Suite 300 Anchorage AK 99503-5789 Al-tN: Sherrie STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: PERF & FRAC Abandon_ Suspend_ Operational shutdown _ Re-enter suspended well _ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _X Change approved program _ Pull tubing _ Variance _ Perforate _X Other _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~le, AK 99519-6612 5. Type of Well: Development __X Exploratory __ Stratigraphic __ Service__ 4. Location of well at surface 450' FNL, 1177' FEL, Sec. 21, T11N, R12E, UM At top of productive interval 2690' FNL, 1145' FEL, SEC 15, T11N, R12E, UM At effective depth 2690' FNL, 1145' FEL, Sec. 15, T11N, R12E, UM At total depth 2385' FNL, 16' FEL, Sec 15 T11N, R12E, UM (asp's 612049, 5959806) (asp's 616020, 5962534) (asp's 617307, 5962927) (asp's 618431, 5963249) 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Size Conductor 110' 20" Surface 2845' 9-5/8" Production 7712' 7" liner 2775' 4-1/2" 10343 feet Plugs (measured) 5323 feet 9171 feet Junk (measured) 5252 feet Cemented 260 sx AS (Approx.) 444 sx ASIII, 273 sx 'G' 494 sx Class 'G' Slotted Liner / 235 sx Class 'G' Perforation depth: measured Slotted Liner 7718'- 9040' true vertical Slotted Liner 5221' - 5241' Tubing (size, grade, and measured depth Packers & SSSV (type & measured depth) 3-1/2" 9.3#, L-80 TBG @ 6219'. 7"x 3-1/2" Baker S-3 Packer @ 6162' MD. 3-1/2" HES 'X' Nipple @ 2100'. 6. Datum elevation (DF or KB feet) RKB 81.3 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-201 9. Permit number / approval number 201-051 10. APl number 50-029-23007 11. Field / Pool Prudhoe Bay Field / Polaris Pool (undefined) Measured Depth True vertical Depth 139' 139' 2874' 2672' 7738' 5222' 7568'-10343' 5203'-5322' RECEIVED DEC 1 0 2001 Alaska 011 & Gas Cms. Commissior~ 'Anchorage 13. Attachments Description summary of proposal _X Detailed operations program _ BOP sketch __ 15. Status of well classification as: 14. Estimated date for commencing operation 12/13/2001 16. If proposal was verbally approved Name of approver Date approved Oil _ X Gas __ Suspended _ Service 17. I hereby c~ t~he ~o_~ is tru.,~and correct to the best of my knowledge. Signed ~J-'~.~~'/.2.,,~, / Title: Polaris Lead Engineer Don Schmohr FOR COMMISSION USE ONLY Questions? Call Bruce W. Smith @ 564-5093. Date December 10, 2001 Prepared b)/DeWayne R. Schnorr 564-5174 Conditions of approval: Notify Commission so representative may witness I Approval ,,q~. Plug integrity _ BOP Test_ Location clearance_ . .l,~,'x,) ~'~--~ - & {~l ~. Mechanical Integrity Test _ Subsequent form required 10- Approved by order of the Commission C:~mmv l'1tm~.~li T~ulm, Commissioner Date ORIGINAL Form 10-403 Rev 06/15/88 · SUBMIT IN TRIPLICATE bp BP Exploration (Alaska) Inc. 900 East Benson Boulevard P. O, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 December 10, 2001 Tom Maunder Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Dear Tom: Re: Sundry Notice for W-201 Fracs of the OBd, OBc, Oba Sands This program outlines the procedure to sand-back the OBd HAW, separately perf & frac three Schrader Bluff zones (OBd heel, OBc, and OBa), and clean-out through and including the OBd HAW toe. Implementation of the job is pending the arrival of the Schlumberger Protectozone VP plug chemicals (expected 12/5/01). The procedure includes the following major steps: Step~ Category NOB Description I S 600 2 O 600 3 C 6OO 4 C 600 5 O 600 6 C 600 7 C 600 8 O 600 9 C 600 10 C 600 11 O 600 12 C 600 13 S 600 14 T 600 Dummy-off GLMs. Set SPMG in GLM at 6058' (57°). MIT IA to 4000 psig. Full-bore sand-back of HAW heel. Dress-off sand-back to ~ 7530' ELM. Leak-off test < 0.5 BPM. Perf Schrader OBd from 7490 - 7492' ELM (79©) w/12 SPF. Frac Schrader Bluff OBd Sand. Adjust sand top to - 7400' ELM (75°). Perf Schrader OBc from 7300 - 7302' ELM (72©) w/12 SPF. Frac Schrader Bluff OBc-Sand. Adjust sand top to - 7200' ELM (69°). Perf Schrader OBa from 7090 - 7092' ELM (66©) w/12 SPF. Frac Schrader Bluff OBa-Sand. FCO & acid wash to - 8900' MD (bottom slotted liner, 86°). Pull SPMG. HOT. Install GLVs. POP. Frac Flowback. Contacts Office Home Cell Donn Schmohr 564-5093 345-2948 440-8008 Steve Deckert 564-4128 338-1476 240-8046 :::.: ................. : .......... ::...:..:..: ............... :._..: .......... :::::::::::::::::::::::::::::::::: .................................. . :. ~ . ........................................... Last test: Max Deviation: 323 BOPD, 134 MSCFGPD, 0 BWPD, 1540 M GLT, 104B, 281 psig HAW 90° @ 8387'MD. Perf deviation: Min. ID: Last TD tag: Last Downhole Ops: Latest H2S value: BHT & BHP: Reference Log: 65° - 78° 2.813" X Nipples @ 2100', 6150', 6188', & 6208'. 8905' CTM on 9/4/01. Step Rate Test on 9/11/01. None. Offset W-200 10 ppm on 8/19/00. 100° F & 2112 psia Sperry Sun MWD EWR 06/07/01. Operation Procedure 1) Slickline: Prepare well for HAW sand-back & fracs: a) Dummy-off GLMs. i) An HOT of the tubing may be necessary to get slickline tool action at higher angles. b) Set sidepocket memory gauge in GLM #1 @ 6058' MD (57°). i) Program gauge with high daytime and Iow nightime capture rate. Period Sample Frequency Number of Samples (1) 7 AM - 10 PM 12 seconds 4500 (2) 10 PM - 7AM 1 minute 540 The gauge should hold 2 weeks of data (75,000 lines) at this capture rate. (3) After this data gathering period, have the gauge go into the hibernate mode, with a pressure trigger to activate for one more day of high sample rate. c) MIT IA to 4000 psig. 2) Fullbore Sand-Back of HAW: a) Sand-back with to_+7530' MD: i) The sand-back top needs to be above the top of the liner hanger (7568') and below the upcoming perfs (78° OBd heel 7490-7492'). The liner hanger has 5 ina of flow area and does not have a packer, thus this circulation path must be blocked for the frac. The leak-off rate needs to be < 0.5 BPM at 1500 psig wellhead surface (dead string side), so that leak-off does not compromise the upcoming frac. The well must be able to hold 600 psig (acceptable if continuous pumping) to allow use of the Schlumberger CTU e-Fire select fire perforating system. ii) Bullhead in 5 Bbl Schlumberger Protectozone viscous pill (details in spreadsheet) at 3 - 5 BPM. This cross-linked HEC pill will remain in place until broken with HCI. It should provide a pillow to land the slurry pill on. iii) Bullhead in 2800 lbs of sand in a slurry pill of 14 Bbls of 6 ppg sand / 40 ppMg HEC gel (details in spreadsheet) at 3 - 5 BPM. A mixture of 20-40 River Sand and 100 Mesh Sand is recommended to form both an interlocking tight bridge and also to keep the sand-back material from rolling downhill. iv) Displace the leading edge of the slurry pill to 1 Bbl below the liner top at 7568' with 5 Bbls of 40 ppMg HEC gel, followed by 50 Bbls of seawater, followed by 26 Bbls of 60/40 Methanol at 3 - 5 BPM, reducing the rate 1 v) vii) Shut ~( .... n for 15 minutes to let the sand form (' 'idge. Slowly pump on and hesitate to pack the sand into a bridge. The maximum incremental working volume of fluid is only 12 Bbls before the desired sandback depth of _+7530' is reached. If it becomes necessary to lay in another sand slurry pill to get a bridge to hold, then it is recommended to leave the existing sand pill and viscous pill in place and attempt to spot the next sand pill with CTU. Pressure test sandback to 1500 psig wellhead surface (dead string side). A leak-off rate of < 0.5 BPM is acceptable. 3) CTU: Dress-off Sand-back & perf OBd (heel): a) Dress-off sandback plug to _+7530' MD. If a fill clean-out is required, then circulate clean to _+7530' and perform another leak-off test. If the leak-off rate is greater than 0.5 BPM: i) then pull to safety, close in, and pump 1 Bbl of fluid at 1/2 BPM and hestitate. Repeat up to the point that there is still 1 Bbl of the slurry pill from step 2)a)iii above the liner top packer. If the leak rate is still greater than 0.5 BPM; (1) then circulate in a small 100 mesh sand pill, close in and hesitate squeeze until a bridge is formed. b) Perf OBd sand from 7490 - 7492' ELM (twice, yielding 12 spf, spreadsheet attached). i) Recommend Schlumberger e-Fire system (+$3500). Allows two separate select fire gun runs on a single CTU trip. First gun fires on fail safe pressure telemetry. Second gun fires with ball drop. ii) Two runs: 60° phasing 6 JSPF, 2-1/2" 35B UP charges, random orientation. iii) 5 of 6 holes with > 8:1 perf:prop ratio, ie 0.33" perfs > 8 x 0.0394" prop diameter. iv) HAW necessitates very short perf section (2') to initiate a single frac. Friction issue: (1) 12 SPF: 18 BPM / 25 perfs = 0.7 BPM/perf. dPperf friction = 150 psi (negligible). (2) 6 SPF: 18 BPM / 13 perfs = 1.4 BPM/perf. dPperf friction = 400 psi (tolerable). (3) 2 SPF: 18 BPM / 4 perfs = 1.4 BPM/perf. dPperf friction - 1000 psi (significant). 4) OBd Fracture Treatment: a) Load frac tanks with - 100°F 2% KCI water; - 1600 bbls are required (excluding tank bottoms). b) RU the tree-saver/isolation tool for 3 1/2" 9.3 #/ft tubing (verify from rig tubing tally that a joint of 4-1/2" tubing was not run on top). PT backside and maintain 3500 psi throughout treatment (set inner annulus pop-off at 4000 psi). Note, this well has a conventional completion with anchored packer and should withstand treating pressures up to 8500 psi. Pressure test the treating lines to 8000 psi. Set pressure relief valve to 7500 psi, and set pump trips to 7000 psi. This well is expected to treat at ___4100psi (including 1000 psi near well friction) and require 1800 HHP. It is recommended that 3 pumps be on location (1 backup). c) Breaker Tests will be performed on fluids Prior to frac. The breaker schedule will be designed to ensure fluid stability at end of pump time with complete break wi" '~ one hour of shutdown. A minimum '00 cp @ 100 sec-~ is required au shutdown. d) Perform on-site pre-job QA/QC tests and complete BP form. e) Begin pumping Data frac, initial rate will be 5 bpm while displacing wellbore fluid, after displacing Data frac fluid to within a few barrels of top perf, increase pump rate to 18 bpm to displace Data frac. Shutdown for ISIP, monitor for closure time, calculate efficiency and adjust frac schedule as necessary (pad size, fluid loss additive, etc). f) Additional diagnostic tests may be performed after Data frac analysis. Consult with engineer before proceeding with frac. g) Re-establish injection, when add rates are lined out, start counting PAD. Pump pad at 5 BPM and early sand stages at 10 BPM until pad on perfs, then increase rate to 18 BPM. Pump the proppant schedule as detailed in the attached pump schedule. Flush with linear fluid and diesel for freeze protection. i) Underflush by 4 Bbls to provide perf sandback coverage. The top of the slurry should be between the existing OBd perfs (7490-7492') and the upcoming OBc perfs (7300-7302'). The sand will settle to the Iow side of the hole in the 70° hole section. h) Shut-in for ISIP, monitor for 15 minutes. i) Bleed off excess annulus pressure. Rig down service company. 5) CTU prepare for OBc frac a) Dress-off sandback plug to ___7400' MD. If a fill clean-out is required, then circulate clean to __.7400' and perform a leak-off test. If the leak-off rate is greater than 0.5 BPM: i) then, pull to safety, close in, and pump 1 Bbl of fluid at Y2 BPM and hestitate. Repeat up to 3 Bbls (4 Bbl frac underflush volume above perfs. If the leak rate is still greater than 0.5 BPM; (1) then circulate in a small mixed 20-40 and 100 mesh sand pill, close in and hesitate squeeze until a bridge is formed. b) Perf OBc sand from 7300 - 7302' ELM (twice, yielding 12 spf, spreadsheet attached). i) Recommend Schlumberger e-Fire system (+$3500). Allows two separate select fire gun runs on a single CTU trip. First gun fires on fail safe pressure telemetry. Second gun fires with ball drop. ii) Two runs: 60° phasing 6 JSPF, 2-1/2" 35B UP charges, random orientation. iii) 5 of 6 holes with > 8:1 perf:prop ratio, ie 0.33" perfs > 8 x 0.0394" prop diameter. iv) HAW necessitates very short perf section (2') to initiate a single frac. Friction issue: (1) 12 SPF: 18 BPM / 25 perfs = 0.7 BPM/perf. dPperf friction = 150 psi (negligible). (2) 6 SPF: 18 BPM / 13 perfs = 1.4 BPM/perf. dPperf friction = 400 psi (tolerable). (3) 2 SPF: 18 BPM / 4 perfs = 1.4 BPM/perf. dPperf friction = 1000 psi (significant). 6) OBc Fracture Treatment a) Load frac tanks with - 100°F 2% KCI water; -1600 bbls are required (excluding tank bottoms). b) RU the tre( aver/isolation tool for 3 Y2" 12.6 #/ft ti[' ~g (verify from rig tubing tally that a joint of 4-1/2" tubing was not run on top). PT backside and maintain 3500 psi throughout treatment (set inner annulus pop-off at 4000 psi). Note, this well has a conventional completion with anchored packer and should withstand treating pressures up to 8500 psi. Pressure test the treating lines to 8000 psi. Set pressure relief valve to 7500 psi, and set pump trips to 7000 psi. This well is expected to treat at +_4100psi (including 1000 psi near well friction) and require 1800 HHP. It is recommended that 3 pumps be on location (1 backup). c) Breaker Tests will be performed on fluids prior to frac. The breaker schedule will be designed to ensure fluid stability at end of pump time with complete break with-in one hour of shutdown. A minimum of 100 cp @ 100 sec-~ is required at shutdown. d) Perform on-site pre-job QA/QC tests and complete BP form. e) Begin pumping Data frac, initial rate will be 5 bpm while displacing wellbore fluid, after displacing Data frac fluid within a few barrels of top perf, increase pump rate to 20 bpm to displace Data frac. Shutdown for ISIP, monitor for closure time, calculate efficiency and adjust frac schedule as necessary (Pad size, fluid loss additive, etc). f) Additional diagnostic tests may be performed after Data frac analysis. Consult with engineer before proceeding with frac. g) Re-establish injection, when add rates are lined out, start counting PAD. Pump pad at 5 BPM and early sand stages at 10 BPM until pad on perfs, then increase rate to 18 BPM. Pump the proppant schedule as detailed in the attached pump schedule. Flush with linear fluid and diesel for freeze protection. i) Underflush by 5 Bbls to provide perf sandback coverage. The top of the slurry should be between the existing OBc perfs (7300-7302') and the upcoming OBa perfs (7090-7092'). The sand will settle to the Iow side of the 65° hole section. h) Shut-in for ISIP, monitor for 15 minutes. i) Bleed off excess annulus pressure. Rig down service company. 7) CTU prepare for OBa frac a) Dress-off sandback plug to +_7200' MD. If a fill clean-out is required, then circulate clean to +_7200' and perform another leak-off test. If the leak-off rate is greater than 0.5 BPM: i) then, pull to safety, close in, and pump 1 Bbl of fluid at Y2 BPM and hestitate. Repeat up to 4 Bbls (5 Bbl frac underflush volume above perfs. If the leak rate is still greater than 0.5 BPM; (1) then circulate in a small mixed 20-40 and 100 mesh sand pill, close in and hesitate squeeze until a bridge is formed. b) Perf OBa sand from 7090 - 7092' ELM (twice, yielding 12 spf, spreadsheet attached). i) Recommend Schlumberger e-Fire system (+$3500). Allows two separate select fire gun runs on a single CTU trip. First gun fires on fail safe pressure telemetry. Second gun fires with ball drop. ii) Two runs: 60° phasing 6 JSPF, 2-1/2" 35B UP charges, random orientation. iii) 5 of 6 holes with > 8:1 perf:prop ratio, ie 0.33" perfs > 8 x 0.0394" prop diameter. iv) HAW necessitates very short perf section (2') to initiate a single frac. Friction issue: (1) 1 'PF: 18 BPM / 25 perfs = 0.7 BPM/pe IPperf friction = 150 psi (negligible). (2) 6 SPF: 18 BPM / 13 perfs = 1.4 BPM/perf. dPperf friction = 400 psi (tolerable). (3) 2 SPF: 18 BPM / 4 perfs = 1.4 BPM/perf. dPperf friction = 1000 psi (significant). 8) OBa Fracture Treatment a) Load frac tanks with - 100°F 2% KCI water; - 1600 bbls are required (excluding tank bottoms). b) RU the tree-saver/isolation tool for 3 Y2" 9.3 #/ft tubing (verify from rig tubing tally that a joint of 4-1/2" tubing was not run on top). PT backside and maintain 3500 psi throughout treatment (set inner annulus pop-off at 4000 psi). Note, this well has a conventional completion with anchored packer and should withstand treating pressures up to 8500 psi. Pressure test the treating lines to 8000 psi. Set pressure relief valve to 7500 psi, and set pump trips to 7000 psi. This well is expected to treat at _+4100psi (including 1000 psi near well friction) and require 1800 HHP. It is recommended that 3 pumps be on location (1 backup). c) Breaker Tests will be performed on fluids prior to frac. The breaker schedule will be designed to ensure fluid stability at end of pump time with complete break with-in one hour of shutdown. A minimum of 100 cp @ 100 sec-1 is required at shutdown. d) Perform on-site pre-job QA/QC tests and complete BP form. e) Begin pumping Data frac, initial rate will be 5 bpm while displacing wellbore fluid, after displacing Data frac fluid to within a few barrels of top perf, increase pump rate to 18 bpm to displace Data frac. Shutdown for ISIP, monitor for closure time, calculate efficiency and adjust frac schedule as necessary (pad size, fluid loss additive, etc). f) Additional diagnostic tests may be performed after Data frac analysis. Consult with engineer before proceeding with frac. g) Re-establish injection, when add rates are lined out, start counting PAD. Pump pad at 5 BPM and early sand stages at 10 BPM until pad on perfs, then increase rate to 18 BPM. Pump the proppant schedule as detailed in the attached pump schedule. Flush with linear fluid and diesel for freeze protection. i) Underflush by 4 Bbls to prevent overflushing the slurry past the perfs. h) Shut-in for ISIP, monitor for 15 minutes. i) Bleed off excess annulus pressure. Rig down service company. 9) Fill Clean-Out a) Perform CTU fill clean-out and acid wash to - 8900' MD (last tag) or bottom of slotted liner (9040' MD): i) If possible, set GLVs to perform an GLT under-balanced FCO. ii) If an under-balanced FCO is not possible, then use filtered seawater and HEC gel sweeps to clean out. To minimize near wellbore damage, HEC gel sweeps are requested. Biozan gel does not break well at Schrader Bluff formation temperature of 100°F and may cause significant near wellbore damage. Have lab determine HEC gel & breaker loading for mix water at 100°F and desired working time. iii) Expect to encounter sand-back plugs at - 7200', -7400', and -7300'. b) Jet and ci( .... 'ate out 1000 gals of 7-1/2% HCL thru" "~ the 5 Bbl Protectozone viscous pill, which should be at - 7630- 7960' MD. I'his cross-linked HEC viscous pill is non-damaging to the reservoir, but must be broken with HCI. c) Clean-out to - 8900' MD (last tag) or bottom of slotted liner (9040' MD). Circulate clean. d) Freeze protect to 2500' with neat methanol. 10) Prep for Production a) Slickline retrieve SPMG in STA #1 GLM, at 6058' MD. b) It has proven beneficial in preventing hydrates to circulate 170° F hot oil around the IA and tubing shortly prior to POP'g. Thus, when the well is kicked-off, warm fluid is being flowed down the annulus and up the tubing. The gas lift engineer will need to confirm a design that will allow valve opening at 150° F kick-off and valve closing at 40° F operating conditions. If a gas lift design cannot be arrived at to accommodate the HOT, then drop the HOT and instead circulate 20-30 Bbls of Methanol into the IA to provide as a spear ahead of the displacing gas lift. If pumping liquid into the IA and down through a gas lift valve, then limit the surface injection pressure to 1000 psig (~ 1 BPM) to prevent damage to the gas lift valves. c) Set GLV design to lift from bottom. 11) Frac Flowback a) Rig up flowback test separator. b) Schrader wells tend to hydrate-off, especially when unloading cold fluids. Treat gas lift with methanol to prevent freezing. c) Attempt to quantify returned proppant to tank. This will help determine proper flowback procedures. d) Unload well with 0.5 MMSCFGPD. Once the IA volume has been recovered, maintain the production rate at 300 BPD (via the choke). e) Conduct 4 hour well tests. If after 12 hours, solids are <0.1%, then increase GLT to 1 MMSCFGPD and open choke until rate is 600 BPD. f) Conduct 4 hour well tests. If after 12 hours, solids are <0.1%, then increase GLT to 1.5 MMSCFGPD and set choke at full open. g) Do not surge well to flow-back proppant. Surging could cause formation failure and sand production. h) Continue producing to the flow-back separator until the frac gel load has been recovered or the watercut < 10% and the solids production is less than 0.1%. 12) Put well on production immediately. To prevent hydrate formation, do not leave the well shut-in, unless the Pad Operator instructs to shut-in. Don Schmohr TREE = 4-1/16" ClVV WELLHEAD= FMC ACTUATOR= KB. ELEV = 81.3' BF. ELEV = 53.2' KOP= 1450' Max Angle = 55 @ 7749' Datum MD = 10343' Datum TVD= 5323' SS W-201 I 9-5/8" CSG, 40~, L-80, ID= 8.835" H 2874' IMinimum ID = 2.813" @ 2100' 3-112" HES X NIPPLE 13-1/2" TBG, 9.39, L-80, EUE 8rd, D = 2.992" I--~ 6219' ITOP OF 4-1/2" SLOTTED LNR H 7718' 7" CSG, 26#, L-80, ID = 6.276" H 7738' FERFORATION S UIVIVIARY REF LOG: ANGLEATTOPPERF: 86@ 7718' Note: Refer to Production DB for historical pen' data SIZE SPF INTERVAL Opn/Sqz DATE SFF PAGE 2 FOR PERFS I I I I 9040' SAFETY NOTES: WB_L EXCEEDS 70 DEG @ 7313' AND GOES HORtZONTAL@ 7800'. 2100' H3-1/2"HESX NIP, ID: 2.813" I GAS LIFT MANDRELS 6150' 6162' 6188' 6208' 622O' 6661' 6749' 6906' 7568' 7577' H3-1/2,, HES XNIP, ID= 2.813"I H7"x 3-1/2" BKR S-3 PKR, ID= 3.910" H3-1/2" HES X NIP, ID= 2.813" J H3-1/2" HES XNIP, ID= 2.813" ]--~3-1/2" WLEG, ID= 2.992"I HRA TAGIN 7" CSG I H 7" MARKER JOINT I HRA TAG IN 7' CSG I H7"x 5" BKR HR SLV W/6' TIEBK, D = 5.250"I H7"X 5" BKRCMC LNR HGR, ID= 4.408" 8069' IdRA TAG IN 4-1/2" SLOTTED LNR 9096' HBKR EXT. CSG PKR, ID = 3.920"  9170' ]4--1/2" LNR, 12.6#, L-80 ,BT, .0152 bpf, ID=3.958" Id 10343' DATE REV BY COIVIMI~ITS DATE REV BY COIVIVIENTS 06/09/01 HORIZONTAL COMFLETION 06/24/01 CH/lJh CONVERTED TO CANVAS 08/26/01 JJ/KAK PERFS 09/05/01 CAO/tlh DATUM UPDATES PRUDHOE BAY UNIT WELL: W-201 PERNIT No: 201-051 AFl No: 50-029-23007-00 4829' NSL & 1177' WB., Sec.21, T11N, R12E BP Exploration (Alaska) W-201 PERFS ,. PERFORATION SUMMA RY REF LOG: ANGLEATTOP PERF: 86 @ 7718' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 4-1/2" SLTD 7718- 9040 O 06/09/01 4-1/2" SLTD 7765- 7785 O 08/22/01 4-1/2" SLTD 7805- 7815 O 08/22/01 4-1/2" SLTD 7885- 7905 O 08/22/01 4-1/2" SLTD 8000- 8020 O 08/21/01 4-1/'2" SL'DD 8100- 8120 O 08/21/01 4-1/2" SLTD 8170- 8190 O 08/21/01 4-1/2" SLTD 8305- 8315 O 08/21/01 4-1/2" SL'rD 8340- 8360 O 08/20/01 4-1/2" SLTD 8465- 8485 O 08/20/01 4-1/2"~ SLTD 8535- 8555 O 08/20/01 4-1/2" SLTD 8654- 8674 O 08/19/01 I I DATE REV BY COMMENTS DATE REV BY COMMENTS 06/09/01 HORIZO NTA L COMFL ETIO N 06/24/01 CH/tlh CONVER-I'~DTO CANVAS 08/26/01 JJ/KAK PERFS ,, , PRUDHOE BAY UNIT WELL: W-201 PERMIT No: 201-051 APl No: 50-029-23007-00 4829' NSL & 1177' WEL, Sec.21, Tll N, R12E BP Exploration (Alaska) WELL LOG TRANSMITTAL To-' State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 October 3,2001 MWD Formation Evaluation Logs · W-201 POLARIS, AK-MM- 10161 W-201 Polaris: Digital Log Images: 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 R[CE!VED OCT 0 4 2001 Alaska Oil & Gas Cons. Commission Anchorage WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska MWD Formation Evaluation Logs W-201, AK-MM- 10161 September 19, 2001 1 LDWG formatted Disc with verification listing. API#: 50-029-23007-00. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: RECEIVED & Gas Cons. Commis,~ion Anchorage DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL AND GAS TONY I~OWI_~$, GOVERNOR 550 WEST 7TM AVENUE, SUITE 800 ANCHORAGE, ALASKA 99501-$560 PHONE: (907) 269-8800 FAX: (907) 269-8938 September 6, 2001 BP Exploration (Alaska) Inc. 900 East Benson Blvd. P.O. Box 196612. Anchorage, Alaska 99519-6612 RECEIVED 2001 Alaska Oil & Gas Cons. Commission Anchorage Via Fax (564-4637) and Mail Attention: Gil Beuhler Central New Developments Manager Subject: Prudhoe Bay Unit Tract Operations for Wells S-200, S-201 and S-213 on ADL 28258, W-200 (ADL 28263), S-216 (ADL 28261), and W-201 (ADL 28282) Dear Mr. Beuhler: Reference is made to your letter of August 31, 2001 regarding a'request to continue Tract Operations for PBU Wells S-200, S-201 and S-213 on ADL 28258, W-'200 on ADL 28263, S-216 on ADL 28261, and W-201 on ADL 28263-1.. The Division approves your request to extend the Tract Operations. for the six wells' from September 1, 2001 until the fkst of the month following the issuance of the Polaris Participating Area final decision, but in nO case, later than November 1,2001. Sincerely, Mark D. Myers Director cc: Cammy Taylor- AOGCC Wade Fennel- Chevron PBU.PolarisWELLS.TOExtension.doc "Develop, Conserve, and Enhance Natural Resources for Present and Future Alaskans." September 5, 2001 Mr. Mark Myers, .Dire'ctor Division of Oil sad. Gas Department of Natural Resources 550 West 7th Avenue, Suite g00 Anchorage, AK 99501 Tract Operations W-201 Prudhoe Bay Unit ADL 28263.1 BP Exploration ~Alssk~l Ino, 900 Eaat B~nson Boulevard RO. Box 198812 Anchorage, Aleska 99519-6812 {907) S61-S111 Fax (907) 269-8939 Dear Mr. Myers: BP Exploration (Alaska) Inc., ("BP"), on behalf ~f itself and Chevron U.S,A. Inc., Exxon Mobil CorpOration, Forest Oil 'CorpOration, Mobil Alaska I~&P, Inc. and Phillips Alaska, Inc., requested Tract Operations for the Polaris W-20. I well in its letter of Febmm-y 22, 2001. The Division approved this request in its letter of F~bruary 21 and has since extended its approval until September 1,2001. On Friday, August 31, ~001, BP submitted the final documents relative to the Polaris PA along with a request for continued Tract Operations for the Polaris wells to allow for continued production until such time as .,[the Polaris PA is approved by the Division, BP's Tract Operations request of February 20 s~ggested that production from the W-201 well would potentially be from both ADL 047451 a~d ADL 47452 and that we would propose an allocation between these two leases when the 'well was opened to production. This letter incorrectly identified the leases from which production might be attributed, The correct leases should have been ADL 047451 and ADL 028263~1. The W-201 well has been drilled and is now ope~ tO production. The well bottomhole loea,tion was very near the lease line between ADL 047451 and ADL 028263-1; however, it has since been plugged back to a point substantially away f.rom the lease line. All production for this well will be allocated to lease ADL 028263-1, A pla~ is attached which depicts the well trajectory, bottomhole location, plug back location, and the 16, use boundaries, I I apologize for any confusion that the original request may have caused and I look forward to your favorable reply to our August 31~ request ~ ' ' a~d the ulttmate approval of the Polaris you need any additional information, please call me at 564-5727, Best regards, Senior Commercial Analyst BP Exploration (Alaska) Inc. Cc, w/Attachment ' I M, Evans - I~xxon Mobil Corporation K. Griffin - Forest Oil Corporation J. Johnson. - Phillips Alaska, Inc. W. Fennel - Ch,vron U.$,A. Inc. RECEIVED SEP 6 200 An~horaoe I {, Polaris Schrader Bluff Well W-201 Location . ADL026260 ~W-20I Plug Back TD iX=617,306 Y=5,962,926 Z=-5170' TVDSS ~.028263-1 W-201 BHL ~X=618,432 ,Y=5,963~250 ',Z=-5323' TVDSS W.Pad ADL047451 IADL028263-2 · ¢ ADL047452 ADL028264 Structure Contours on 0 Top OBd Sand 1000 2000 3000 4000 5000 Feet STATE OF ALASKA'{' ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service [] TSUSP 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 201-051 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 ........ 50-029-23007-00 4. Location of well at surface 4829' NSL, 1177' WEL, SEC. 21, T11N, R12E, UM ~,,,~ '.~.~ ~/... :_ . ' ~,A~'." 9. Unit or Lease Name At top of productive interval i Z~.,,~?/~'. __ i W:~=~_I P rudhoe Bay Unit 2216' NSL, 2841' EWL, SEC. 15, T11N, R12E, UM 10. Well Number At total depth ~~'7~,_ ~ 2894' NSL, 5263' EWL, SEC. 15, T11 N, R12E, UM ' ' .......... "' h W-201 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Polaris Pool RKB = 81.3' ADL 047451 (Undefined) 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 120. Depth where SSSV set121. Thickness of Permafrost 10343 5323 FTI 9171 5252 FTI []Yes [] NoI (Nipple) 2100' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, DEN, RES, CNL, DIR, USIT, ABI, EWR, PWD 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED ...... 201', ....... 9,1,.5# H-40 28' 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 29' 2874' 12-1/4" 444 sx AS III, 273 sx Class 'G' 7" 26# L-80 26' 7738' 8-3/4" 492 sx Class 'G' 4-1/2" 12.6# L-80 7568' " 'i0343' 6H/~"' Slotted Line~"'/235 sx Class 'G" ' ' 24.'Perforations open to Production (MD+TVD'0f TOp and 25. ' TUBING RECORD " ' Bottom and interval, size and number) ................. SIZE ' DEPTH SET (MD) PACKER SET (MD) 4-1/2" SLTD Section 3-1/2", 9.3#, L-80 6220' 6162' MD TVD MD TVD 7718' - 9040' 5221' - 5241' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 78 Bbls of Diesel 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) July 9, 2001 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL'BBL GAS'MCF WATER'BBL CHOKE SIZE ~ GAS-OIL RATIO 8/1/2001 4 TEST PERIOD 202 113 30 104I 560 Flow Tubing Casing Pressure CALCULATED elL'DEL GAS'MOF WATER-BBL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE ...... Co. ...... Brief' clesc~iPti'O'~ 'Oi lithoiogy, porosity, fractures, apparent dips and presence'of oil, gas or water. Submit core Chips. RECEIVED AUG 09 2001 · Form 10-407 Rev. 07-01-80 0 R I GI.,,N A[ " & Gas ~ns. u.0mm,lsslu~ Alaska 0il Anch~¢~z ~nl.)uplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. MA 6287' 4607' Mb1 6356' 4648' Mb2 6427' 4692' Mc 6569' 4778' Na 6685' 4848' Nb 6726' 4872' Nc 6798' 4913' CA 6948' 4995' OBa 7055' 5046' eBb 7158' 5089' CBc 7255' 5123' OBd 7472' 5185' OBd 8752' 5240' OBd 9220' 5258' ~1. List of Attachments: '" Summary of Daily Dril'ling'Reports, Surveys'i Leak Off Test Summary ................. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubb,e .~~ ~(~. Title Technical Assistant Date ~)~'i~?"~/ W-201 201-051 Prepared By Name/Number: $ondra Stewman, 564-4750 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Legal Name: W-201 Common Name: W-201 5/28/2001 LOT 2,905.0 (ft) 2,677.0 (ft) 9.50 (ppg) 590 (psi) 1,911 (psi) 13.74 (ppg) 6/4/2001 FIT 7,738.0 (ft) 5,221.0 (ft) 9.10 (ppg) 790 (psi) 3,258 (psi) 12.01 (ppg) Printed: 6/28/2001 2:17:42 PM BP EXPLORATION Page. 1 of 7 Operations Summa Report Legal Well Name: W-201 Common Well Name: W-201 Spud Date: 5/22/2001 Event Name: DRILL+COMPLETE Start: 5/20/2001 End: Contractor Name: NABORS Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 5/20/2001 04:30 - 09:30 5.00 MOB P PRE RID top drive, bridal lines, floor equip. Lay down derrick. Open cellar, unhook lines. 09:30 - 15:00 5.50 MOB P PRE Wait on matts and plywood being laid on road. 15:00 - 18:30 3.50 MOB P PRE Move camp and mud pits to W pad. Move rig sub to spine road. 18:30 - 22:00 3.50 MOB P PRE Reposition mats and plywood on spine road. 22:00 - 00:00 2.00 MOB P PRE Moving rig on spine road. 5/21/2001 00:00 - 03:00 3.00 MOB P PRE Cont. to move rig. 03:00 - 06:00 3.00 MOB P PRE Spot Sub base, Pits and Cuttings tank. 06:00 - 07:00 1.00 RIGU P PRE Wait on trucks moving another rig. 07:00 - 11:00 4.00 RIGU P PRE Held PJSM. Raise derrick and pin, cont. RU. 11:00 - 14:00 3.00 RIGU P PRE Clear floor, service RT, Top Drive. 14:00 - 16:00 2.00 RIGU P PRE Clean Rig - derrick. RIG ACCEPTED 14:00 hrs - 5/21/01. 16:00 - 19:00 3.00 BOPSUR P SURF NU Diverter, 20" riser and diverter line. 19:00- 20:00 1.00 RIGU P PRE Clean Rig Floor. 20:00 - 21:00 1.00 RIGU P PRE Held pre-spud / HSE meeting. 21:00 - 00:00 3.00 DRILL P SURF PU 2,147' of 4" DP. 5/22/2001 00:00 - 02:00 2.00 DRILL P SURF Con. PU 4" DP, 5" HWDP and stand back. 02:00 - 06:00 4.00 DRILL P SURF PU BHA #1, orient MWD. adjust motor to 1.5 deg. 06:00 - 06:30 0.50 DRILL P SURF Function test Diverter system - okay. RIH and tag cmt at 101'. 06:30 - 08:30 2.00 DRILL P SURF PJSM, drill to 178'. 08:30 - 10:30 2.00 DRILL N SFAL SURF Unplug flowline. 10:30 - 12:30 2.00 DRILL P SURF Drill from 210' - 275' 12:30 - 13:00 0.50 DRILL N SFAL SURF Unplug flowline. 13:00 - 14:00 1.00 DRILL P SURF Drill from 275' - 310'. 14:00 - 14:30 0.50~ DRILL P SURF Circ. and cond. mud. 14:30 - 15:00 0.50 DRILL 'N WAIT SURF Wait on Super Sucker trucks. 15:00 - 19:30 4.50 DRILL P SURF Drill ahead 310'- 551'. 19:30 - 21:00 1.50 DRILL P SURF RU slickline and run Gyro chk shot survey - 1.8 deg inclination. 21:00 - 22:30 1.50 DRILL P SURF Slide from 551' - 628' making course correction. 22:30 - 00:00 1.50 DRILL P SURF Rotary drill to 736'. 5/23/2001 00:00 - 03:00 3.00 DRILL P SURF Drill 736' - 923'. 03:00 - 03:30 0.50 DRILL P SURF ~Circ & Cond at 923'. 03:30 - 04:30 1.00 DRILL P SURF POOH for BHA change. 04:30 - 05:00 0.50 DRILL P SURF PU BHA, MU HWDP. 05:00 - 05:30 0.50 DRILL P SURF RIH w/BHA and HWDP, CO elevators from 5" to 4". 05:30 - 06:00 0.50 DRILL P SURF Drill 923'-954'. 06:00 - 07:00 1.00 DRILL P SURF Orient MWD, RU to run gyro chk shot survey. 07:00 - 23:00 16.00 DRILL 3 SURF Drill 954' - 1,845'. 23:00 - 23:30 0.50 DRILL 3 SURF CBU (Outer retainer on Pop-off for #1 pump failed. Unable to drill ahead). 23:30 - 00:00 0.50 DRILL 3 SURF Short trip to top of HWDP. 5/24/2001 00:00 - 01:00 1.00 DRILL 3 SURF Cont. ST from 1,326' - 860'. Change out Popoff on #1 mud pump. 01:00 - 02:30 1.50 DRILL 3 SURF RIH, finish change out Popoff. 02:30 - 16:00 13.50 DRILL ~ SURF Drill 1,845' - 2 885' (ART - 3.25, AST = 5.5 hrs). 16:00 - 17:00 1.00 DRILL ~ SURF C & C mud at 500 gpm. 17:00 - 18:30 1.50 DRILL 3 SURF ST to top of HWDP at 860'. SLM - no correction. Pulled 25K over at 2,350', 2,312' and 2,198'. 18:30 - 20:30 2.00 DRILL ~ SURF RIH to TD, with tight spots at 1,957' and 2,198'. Wash and ream through - okay. 20:30 - 23:00 2.50 DRILL 3 SURF C&C hole at 490 gpm. Reduce vis to 150. 23:00 - 00:00 1.00 DRILL P SURF Drop 2.25" rabbit, POOH to 1,400'. Printed: 6/11/2001 2:51:01 PM BP EXPLORATION Page 2 of 7 Operations Summary Report Legal Well Name: W-201 Common Well Name: W-201 Spud Date: 5/22/2001 I Event Name: DRILL+COMPLETE Start: 5/20/2001 End: Contractor Name: NABORS Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 5/25/2001 00:00 - 01:30 1.50 DRILL P SURF Cont. POOH to top of motor assembly at 214'. 01:30 - 02:00 0.50 DRILL P SURF Clean rig floor. 02:00 - 04:30 2.50 DRILL P SURF LD BHA. 04:30 - 05:00 0.50 DRILL P SURF Clear rig floor, prep for casing job. 05:00 - 09:00 4.00 CASE P SURF PJSM, PU/RU casing equip and Fillup tool. Drift TAM Port collar to 8.75". 09:00 - 10:00 1.00 CASE P SURF MU Landing joint to Hngr, drift Hngr to 8.75", Make dummy test run - okay. 10:00 - 12:00 2.00 CASE : P SURF PJSM, Run, thrd lock 9-5/8" shoe track, check Float shoe. 12:00 - 14:30 2.50 CASE P SURF Run 22jts of 9-5~8", 40#, L-80 BTC-M casing, ran bow spring cents, w/stop rings on jts 3-15, and rigid cent. on shoe joints. Torqued to 9,000 fi-lb. 14:30 - 15:30 1.00 CASE P SURF Braided cable on sling parted and jr. #23 fell approx. 8' back onto the skate. No injuries. Safety stand-down. 15:30 - 19:30 4.00 CASE N SFAL SURF Wait on rig modification an delivery of new sling. Safety team investigated rig incident. Reviewed problems and procedures. Made necessary changes and plan modifications. 19:30 - 00:00 4.50 CASE N FLUD SURF Remove and thaw rotary hose. Thaw standpipe gooseneck. Removed standpipe, to thaw and remove freeze plug. 5/26/2001 00:00 - 03:30 3.50 CASE N FLUD SURF Cont. thawing standpipe. Reconnect standpipe and Rotary Hose. 03:30 - 07:30 4.00 CASE P SURF PJSM. cont. running 9-5/8", 40-1b/ft, L-80, BTC csg to 1,986'. Hit ledge, tight hole - 105K up, 90K down. 07:30 - 09:00 1.50 CASE N DPRB SURF Pump thru fillup/circ tool. Circ hole clean. Wash thru tight spots at 1,986' and 2,026'. 09:00 - 11:00 2.00 CASE P SURF Cont. to run csg. Work thru tight spots at 2,150' and 2,170'. 11:00-11:30 0.50 CASE N DPRB SURF Wash from2,170-2,189'. 11:30 - 13:30 2.00 CASE P SURF Cont. RIH with csg to 2,873' 13:30 - 14:00 0.50 CASE P SURF RU to circulate casing. 14:00 - 18:00 4.00 CASE P SURF C&C mud for cementing. Reciprocate pipe - 140K Up, 115K Dwn. 18:00 - 20:30 2.50 CASE P SURF PJSM. R/U Cementers, pumped 5 bbl H20, & pressure test lines to 3500 psi - OK. Pump 5 bbl H20, 75 Bbls 10.0 ppg Mudpush, 351 Bbls (1,971 ft3) Arcticset Lite III, Lead cmt @ 10.Tppg, followed by 57 Bbls (320 ft3) tail cmt + additives @ 15.8 ppg, at 6 BPM. Reciprocate pipe until 351 bbl of Lead was pumped, and pipe became sticky. Set pipe down. Drop plug & displace w/212 Bbls 9.6 ppg mud w/rig pump. Plug bumped w/ 1500 psi & floats held OK. CIP @ 20:30 Hrs. Recovered 56 Bbls of contaminated cmt, 25 bbls 10.7ppg cmt. 20:30 - 23:00 2.50 CASE P !SURF RD Cementers. RD csg tools. Back out Landing Jr., wash down stack. 23:00 - 00:00 1.00 BOPSUF. P SURF ND Diverter system. 5/27/2001 00:00 - 04:30 4.50 WHSUR P INT1 i Cont. ND Diverter system. 04:30 - 06:00 1.50 WHSUR P INT1 NU 5000 psi FMC Split Speedhead, Base Flange, Tubinghd. 06:00 - 10:00 4.00 BOPSUF.P INT1 NU BOPE. Changed pump liners to 5". ;10:00- 10:30 0.50 BOPSUF.P INT1 PU, Installtest plug. 10:30 - 12:00 1.50 BOPSUF.N RREP INT1 ] Repair Test Pump. 12:00 - 18:30 6.50 BOPSUF.P INT1 'PJSM. Test BOPs -Annular, Pipe Rams, Blind Rams 25013,500 psi - okay. Test - Chk line and valves, HCR valves, Kill Line valves 250/3,500 psi-okay. UppedLower Kelly cock valves, Ball valve, TIW valve - 250/3,500 psi - okay. All tested for 10 min Hi/Low. Test witnessing waived by Jeff Jones - Printed: 6/11/2001 2:51:01 PM BP EXPLORATION Page 3 of 7 Operations Summa Report Legal Well Name: W-201 Common Well Name: W-201 Spud Date: 5/22/2001 Event Name: DRILL+COMPLETE Start: 5/20/2001 End: Contractor Name: NABORS Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 5/27/2001 12:00- 18:30 6.50 BOPSUFiP INT1 AOGCC. 18:30 - 20:00 1.50 DRILL I P INT1 Service Top Drive. 20:00- 20:30 0.50 :)RILL =P INT1 RU to PU DP/BHA. 20:30 - 22:00 1.50 DRILL . P INT1 PJSM, PU 4" DP and stand in derrick. 22:00 - 22:30 0.50 DRILL N RREP INT1 Repair hydraulic hose on drawworks. 22:30 - 00:00 1.50 DRILL P INT1 Cont. to PU 4" DP. 5/28/2001 00:00 - 02:00 2.00 DRILL P INT1 PU/MU 4" DP, stand back. 02:00 - 07:00 5.00 DRILL P INT1 PJSM. PU/MU BHA, PU/MU MWD tools to 239'. Surface function test, add probe, orient. 07:00 - 09:30 2.50 DRILL P INT1 RIH w/HVVDP, 4" DP to above the FC at 2,753'. 09:30 - 11:00 1.50 DRILL P INT1 PJSM, CIT - 9-5/8", 40# E-80 csg. MW 9.8ppg. Pump at 1/2 BPM, and press, up to 3,500 psi - hold for 30 rain - okay. Bleed press. 11:00 - 15:00 4.00 DRILL P INT1 Service Top Drive. Change out Drill Line. 15:00 - 18:00 3.00 DRILL P INT1 Drill out cmt Float equip, and shoe track. Drill new fm to 2,905' md. 18:00 - 19:00 1.00 DRILL P INT1 Circ. and CIO to 9.5 ppg LSND. 19:00 - 21:00 2.00 DRILL P INT1 Perform LOT, pump 1/2 BPM. Leak offat 580 psi, 13.7 EMW. 21:00 - 00:00 3.00 DRILL P INT1 Control drill at 180 fi/hr to 3,275'. 5/29/2001 00:00 - 06:30 6.50 DRILL P INT1 Con't ~ Directional drill 8 3~4" hole @ a controlled rate of 180 fi/hr from 3,275' to 3962'. MWD = GR, DEN, RES, CNL, & DIR. (stg wt = 125 k up, 90 k dn,& 102 k rot). ART = 4.25 Hrs & AST = .75 Hrs. 06:30 - 07:30 1.00 DRILL P INT1 Circulate bottoms up. monitor well - static. 07:30 - 08:30 1.00 DRILL P INT1 Short trip from TD @ 3962' to 2847' (note - 9 5/8" csg set @ 2873'). No hole problems. Monitor well - static. RIH to TD. 08:30 - 14:30 6.00 DRILL P INT1 Con't ~ Directional drill 8 3~4" hole @ a controlled rate of 180 fi/hr from 3962' to 4606'.. MWD - GR, DEN, RES, CNL, & DIR. (stg wt = 130 k up, 90 k dh, & 105 k rot). ART = 3.50 Hrs & AST = .25 Hrs. 14:30 - 17:00 2.50 DRILL N RREP INT1 Change out popoff on #1 mud pump (a change out of popoff body was required) & repaired popoff on #2 pump. 17:00 - 00:00 7.00 DRILL P INT1 Con't ~ Directional drill 8 3/4" hole @ a controlled rate of 180 fi/hr from 4606' to 5363'. MWD = GR, DEN, RES, CNL, & DIR. (stg wt = 145 k up, 95 k dn, & 105 k rot). ART = 4.25 Hrs & AST = .50 Hrs. 5/30/2001 00:00 - 03:30 3.50 DRILL P INT1 Con't ~ Directional drill 8 3/4" hole from 5363' to 5736'. MWD = GR, DEN, RES, CNL, & DIR. (stg wt = 150 k up, 95 k dn,& 110 ~k rot). ART = 2.50 Hrs & AST -- 0.0 Hrs. 03:30 - 04:30 1.00 DRILL P INT1 Circulate bottoms up & monitor well - static. 04:30 - 07:30 3.00 DRILL P INT1 POH f/5736' to 4685' w/30 - 40 k overpull f/5300' to 4685'. RIH f/4685' to 4800'. Wash down f/4800' to 5300'. Con't RIH to TD @ 5736'. 07:30 - 09:30 2.00 DRILL P INT1 Pump hi-vis sweep, circulate & condition hole & raise mud weight to 9.8 ppg. 09:30 - 11:00 1.50 DRILL P INT1 Monitor well - static. POH f/5736' to 3863' w/no hole problems. Monitor well - static. RIH to TD @ 5736'. 11:00 - 00:00 13.00 DRILL P INT1 Con't ~ Directional drill 8 3/4" hole from 5736' to 6575'. MWD = GR, DEN, RES, CNL, & DIR. (stg wt = 155 k up, 100 k dn,& 120 k rot). ART = 9.50 Hrs & AST = 3.50 Hrs. 5/31/2001 00:00 - 00:00 24.00 DRILL P INT1 Con't ~ Directional drill 8 3/4" hole from 6575' to 7748'. MWD = GR, DEN, RES, CNL, & DIR. (stg wt -- 160 k up, 110 k dn,& 120 k rot). ART = 4.00 Hrs & AST = 11.75 Hrs. Printed: 6/11/2001 2:51:01 PM BP EXPLORATION Page 4 of 7 Operations Summa Report Legal Well Name: W-201 Common Well Name: W-201 Spud Date: 5/22/2001 Event Name: DRILL+COMPLETE Start: 5/20/2001 End: Contractor Name: NABORS Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 6/1/2001 00:00 - 01:30 1.50 DRILL P INT1 Pump hi-vis sweep & circulate bottoms up. Monitor well - static. 01:30 - 04:00 2.50 DRILL P INT1 Short trip f/TD @ 7748' to 5717'. No hole problems. Monitor well - static. RIH & return to TD w/no hole problems. 04:00 - 05:30 1.50 DRILL P INT1 Pump hi-vis sweep & circulate hole clean. 05:30 - 09:30 4.00 DRILL P INT1 POH f/TD @ 7748' to 887'. 09:30 - 13:30 4.00 DRILL P INT1 PJSM. POH & L/D directional BHA & download MWD tools. Clear floor & secure MWD/directional equipment. 13:30 - 15:00 1.50 DRILL P INT1 PJSM. Rig up & pull wear bushing. M/U 7" Csg hanger & landing joing & make dummy run - OK. 15:00 - 16:30 1.50 DRILL P ;INT1 PJSM. Close blind rams & change top rams to 7". PJSM & pressure test bonnet door seals to 250 PSI (Iow) & 3500 psi (high) - OK. 16:30 - 18:00 1.50 DRILL P INT1 PJSM. R/U for running 7" Csg. 18:00 - 22:00 4.00 DRILL P INT1 P/U & threadlock first 3 jts. R/U Franks fill up tool & fill same. Check float equipment - OK. 22:00 - 00:00 2.00 DRILL P INT1 Con't ~ RIH w/7" 26#, L-80, BTC Csg. 6/2/2001 00:00 - 04:30 4.50 DRILL P INT1 Con't ~ RIH w/7" Csg to 7738'. 04:30 - 05:00 0.50 DRILL P INT1 P/U & M/U 7" hanger, landing joint, & cement head. 05:00 - 07:00 2.00 DRILL P INT1 Stage pumps slowly & break circulation. Circulate & condition hole while recipracting csg. (stg wt = 180 k up & 95 k dn). 07:00 - 09:00 2.00 DRILL P INT1 MI & RU Dowell. PJSM. Pump 5 Bbl (CWl00) chemical wash & pressure test pumps & lines to 4000 K - OK. Drop bottom plug folowed by 50 bbls mud push, mix & pump lead cmt of 72 Bbls @ 13.0 ppg, & 71.5 Bbls Tail cmt @ 15.8 ppg. Drop closing plug & pump 10 Bbls water. Csg reciprocated during entire cmt job. (Final stg wt = 200 k up & 105 k dh). Note - Please see cement & casing reports attached. .09:00 - 10:00 1.00 DRILL P INT1 Displace 7" csg with rig pump (282 3/4 Bbls). Bump plug & pressure Csg to 3500 psi. Check floats- OK. Mud push spacer seen in returns at time plug was bumped. 10:00 - 11:00 1.00 DRILL P INT1 RID Csg equipment & secure floor. 11:00 - 12:00 1.00 DRILL P INT1 Install packoff, run in lock down screws, & pressure test same to 5000 psi for 15 min - OK. 12:00 - 12:30 0.50 DRILL P INT1 Establish injection rate & inject 40 Bbl mud @ 38 bpm @ 1000 psi. Con't to inject 1 Bbl every 30 min while waiting on compressive strength results from Dowell lab. 12:30 - 14:00 1.50 DRILL P INT1 PJSM. Change out top set of BOP rams from 7" to 3 1/2" X 6" variable. 14:00 - 19:30 5.50 DRILL P INT1 PJSM. Set test plug & pressure test BOPE, et al, as per BP requirements. Pressure test (Iow) to 250 psi for 5 min & (high) of 3500 for 10 min. All pressures & times charted & recorded. AOGCC represenative, Mr. Chuck Schieve, on location to witness all pressure testing. 19:30 - 20:00 0.50 DRILL P INT1 Recover test plug & set wear bushing. 20:00 - 21:00 1.00 DRILL P INT1 PJSM. Slip & cut drilling line. 21:00 - 22:00 1.00 DRILL P INT1 Service top drive. 22:00 - 00:00 2.00 DRILL P INT1 Con't to inject 1 Bbl every 30 min while waiting on compressive strength results from Dowell lab, as per program, with a total of 68 Bbls pumped in annulus. 6/3/2001 00:00 - 00:30 0.50 DRILL P INT1 Con't ~ Inject mud in 7"X 9 5/8" annulus & wait on Dowell lab results. Total injected in annulus = 69 Bbls mud. 00:30 - 02:30 2.00 DRILL P INT1 PJSM. R/U Hot oil sv¢ & freeze protect 7" X 9 5/8" annulus w/ Printed: 6/11/2001 2:51:01 PM BP EXPLORATION Page 5 of 7 Operations Summary Report Legal Well Name: W-201 Common Well Name: W-201 Spud Date: 5/22/2001 Event Name: DRILL+COMPLETE Start: 5/20/2001 End: Contractor Name: NABORS Rig Release: Rig Name: NABORS 7ES Rig Number: Date From-To Hours Activity Code NPT Phase Description of Operations 6/3/2001 00:30 - 02:30 2.00 DRILL P INT1 57 Bbl 'dead' crude @ 1.4 bpm @ 100 psi. Dead crude temp = 90 Deg. 02:30 - 10:00 7.50 DRILL P INT1 PSJM. R/U Schulmberger & RIH w/USIT logs. Loggers TD = 7160'. Run USIT log from 7160' to 2800'. POH, R/D & M/O Schlumberger. 10:00 - 14:00 4.00 DRILL P INT1 P/U 6 1/8" bit & M/U BHA # 4. Upload MWD. RIH to 248' & shallow test all components of BHA # 4 - OK. 14:00 - 19:30 5.50 DRILL P INT1 RIH picking up 4" DP singles f/248' to 5952'. Fill drill string & con't RIH. Tag top of cement @ 7622'. 19:30 - 20:30 1.00 DRILL P INT1 PJSM. Perform CIT pressure test to 3500 psi & hold for 30 min - OK. CIT pressure test charted & recorded. 20:30 - 22:00 1.50 DRILL P INT1 Clean out cement stringers, drill float collar & float shoe (6 7738'). 22:00 - 23:00 1.00 DRILL P INT1 Clean out 10' of rathole & drill 20' of new formation. MAD PASS 7743' to 7768'. (MWD = ABI, GR, EWR, Dir, PWD, DEN, CNL) ART = .25 Hrs &AST = 0 Hrs. (Stg wt = 150 k up, 90 k dn,& 104 k rot). 23:00 - 00:00 1.00 DRILL P INT1 Displace hole to 9.1 ppg new Baradrill mud. 6/4/2001 00:00 - 00:30 0.50 DRILL P INT1 Con't ~ MAD PASS from 7738' to 7768'. 00:30 - 01:00 0.50 DRILL P INT1 Perform FIT to 790 psi (EMW of 12.0 ppg) & hold for 10 min. All pressures & rates charted & recorded. 01:00 - 18:00 17.00 DRILL P INT1 Directional drill 6 1/8" hole w/1.50 Deg mtr f/7768" to 8831". MWD = ABI, GR, EWR, DIR, PWD, DEN, & CNL. (stg wt = 160 k up, 80 k dn,& 110 k rot). ART = 10.0 Hr & AST = 1.50 Hrs. 18:00 - 19:30 1.50 DRILL P INT1 Pump high vis sweep & circulate bottoms up. Monitor well - static. 19:30 - 20:00 0.50 DRILL P INT1 Short trip from 8831' to 7712' (Note - 7" csg shoe @ 7738'). No hole problems. 20:00 - 20:30 0.50 DRILL P INT1 Service top drive unit. Monitor well - static. 20:30 - 21:00 0.50 DRILL P INT1 RIH f/7712' to TD @ 8831'. No hole problems. 21:00 - 00:00 3.00 DRILL P INT1 Directional drill 6 1/8" hole w/1.50 Deg mtr f/8831to 8864". MWD = ABI, GR, EWR, DIR, PWD, DEN, & CNL. (stg wt = 168 k up, 70 k dn, & 98 k rot). ART = 1.0 Hr & AST = 0.75 Hrs. 6/5/2001 00:00 - 00:00 24.00 DRILL P INT1 Con't ~ Directional drilling 6 1/8" hole w/1.50 Deg mtr f/ 8864" ~to 10,010'. MWD = ABI, GR, EWR, DIR, PWD, DEN, & CNL. (stg wt = 180 k up, 65 k dh, &105 k rot). ART = 10.75 Hr & AST = 6.25 Hrs. 6/6/2001 00:00 - 04:00 4.00 DRILL P INT1 Con't ~ Directional drilling 6 1/8" hole w/1.50 Deg mtr f/10,010' to 10,343'. MWD = ABI, GR, EWR, DIR, PWD, DEN, & CNL. (stg wt = 180 k up, 65 k dn, &105 k rot). ART = 3.0 Hr & AST = 0.0 Hrs. 04:00 - 05:30 1.50 DRILL P INT1 Mix & pump hi vis sweep & circulate hole clean. Rotate & reciprocate drill string during circulation. 05:30 - 07:00 1.50 DRILL P INT1 Monitor well- static. POH into 7" csg @ 7712'. No hole ~roblems. 07:00 - 08:00 1.00 DRILL P INT1 Service top drive unit. 08:00 - 09:00 1.00 DRILL P INT1 Monitor well - static. RIH f/7712' to TD @ 10,343'. No hole ~roblems. 09:00 - 10:00 1.00 DRILL P INT1 Mix & pump hi vis sweep & circulate hole clean. Rotate & reciprocate drill string during circulation. 10:00 - 11:00 1.00 DRILL P INT1 Spot 95 Bbl Iliner running pill in open hole section. Monitor well - static. Drop 2.25" rabbit. Printed: 6/11/2001 2:51 :O1 PM BP EXPLORATION Page 6 of 7 Operations Summary Report Legal Well Name: W-201 Common Well Name: W-201 Spud Date: 5/22/2001 Event Name: DRILL+COMPLETE Start: 5/20/2001 End: Contractor Name: NABORS Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 6/6/2001 11:00 - 16:30 5.50 DRILL P INT1 POH to 246'. 16:30 - 21:30 5.00 DRILL P INT1 PJSM. Down load MWD tools & L/D directional BHA & clear floor. 21:30 - 22:30 1.00 DRILL P INT1 PJSM. Slip & cut drilling line. 22:30 - 00:00 1.50 DRILL P INT1 Rig up to run 4 1/2" liner. 6/7/2001 00:00 - 01:30 1.50 DRILL P INT1 PJSM (wi new crew). Con't R/U casing equipment & verify I casing running order. 01:30 - 06:00 4.50 DRILL P INT1 !Run 4 1/2" 12.6#, L-80, IBT-M liner (float shoe, 28 jts tbg, float ~collar, X-O & Baker seal bore extension~ Baker External Casing Pkr, Baker seal bore extension & X-O's, 1 jt tbg, 25 jts slotted tbg, 1 Marker jt slotted tbg, 11 jts slotted tbg, 3 jts tbg). 06:00 - 11:30 5.50 DRILL P INT1 P/U & R/U 2 7/8" handling equipment. Run 47 jts of 2 7/8" 7.7# FOX tbg for inter string & space out same. 11:30 - 12:00 0.50 DRILL P INTI P/U & M/U Baker liner hanger ass'y & RID 2 7/8" equipment. 12:00 - 12:30 0.50 DRILL P INT1 RIH w/1 stand DP f/2796' to 2890'. Circ liner vol, drop ball & check seals - OK. 12:30 - 19:00 6.50 DRILL P INT1 Con't ,,, RIH to 10322'. M/U cement head & circulate to TD @ 1 O343'. 19:00 - 22:00 3.00 DRILL P INT1 Circulate & condition hole & wait on trucks, pump rates =2 bpm @ 400 psi, 3 bpm @ 575 psi, 4 bpm @ 830 psi. Stg wt = 180 k up & 78 k dn. 22:00 - 00:00 2.00 DRILL P INT1 PJSM. Set CMC mechanical set liner hanger. Pump 5 Bbl preflush, pressure test pump & lines to 4500 psi - OK. Pump remaining 5 Bbl preflush followed by 15 Bbl MudPush XL. Batch mix & pump 48 Bbls (230 sx) class 'G' cement, as per program. Drop wiper plug & displace w/85 Bbls mud. Plug down & cement in place @ 23:47 Hrs. Inflate ECP packer @ 3100 psi. 6/8/2001 00:00 - 00:30 0.50 DRILL P INT1 L/D cement head & POH to 8762'. 00:30 - 03:00 2.50 DRILL P INT1 Circulate bottoms up. Circulate +/- 3 Bbls cement contamiated mud to surface. Continue circulating & displace hole to 9.1 ppg brine. Mix & pump dry job. 03:00 - 08:30 5.50 DRILL P INT1 POH & stand back 6 stands. Con't POH laying down singles of 4" drill pipe to 1472'. 08:30 - 09:30 1.00 DRILL P INT1 PJSM. R/U 2 7/8" tubing handling equipment 09:30 - 11:30 2.00 DRILL P INT1 POH laying down 2 7/8" inter string tbg & con't POH laying down remainder of 4" drill pipe. 11:30 - 12:30 1.00 DRILL P INT1 Clear floor & secure 2 7/8" & 4" handlling tools. 12:30 - 13:00 0.50 DRILL P INT1 Pull wear bushing. 13:00 - 14:30 1.50 DRILL P INT1 Rig up 3 1/2" tubing handlling equipment. 14:30 - 22:30 8.00 DRILL P INT1 PJSM. Run 3 1/2" production tubing to 6187'. P/U & M/U tubing hanger & landing joint. 22:30 - 00:00 1.50 DRILL P INT1 Reverse circulate clean 9.1 ppg brine with corrosion inhibitor. 6/9/2001 00:00 - 00:30 0.50 DRILL P INT1 Con't reverse circulate w/clean 9.1 ppg brine w/corrosion inhibitor. 00:30 - 01:00 0.50 DRILL P INT1 Land tubing hanger & run in lock down screws. 01:00 - 02:30 1.50 DRILL P INT1 Drop ball & rod combination (1 5/16"), pressure up on tubing to 3500 psi (22 stks) & set packer @ 6166'. Hold pressure for 30 rain - OK. Bleed tbg pressure to 1500 psi & pressure annulus to 1800 psi. Hold for 30 min - OK. Bleed tbg pressure & shear RP valve. (Note - Pressures charted & recorded.) 02:30 - 03:00 0.50 DRILL P INT1 L/D landing joint & install TVVC. Pressure test same to 1800 psi Printed: 6/11/2001 2:51:01 PM BP EXPLORATION Page 7 of 7 Operations Summary Report Legal Well Name: W-201 Common Well Name: W-201 Spud Date: 5/22/2001 Event Name: DRILL+COMPLETE Start: 5/20/2001 End: Contractor Name: NABORS Rig Release: Rig Name: NABORS 7ES Rig Number: Date From-To Hours Activity Code NPT Phase Description of Operations 6/9/2001 02:30 - 03:00 0.50 DRILL P INT1 from below - OK. (Note - Pressure charted & recorded) 03:00 - 07:00 4.00 DRILL P INT1 N/D BOP stack & N/U Tubing adaptor & Xmas tree. 07:00 - 07:30 0.50 DRILL P INT1 Pressure test adaptor & Xmas tree to 5000 psi- OK. 07:30 - 11:30 4.00 DRILL N WAIT INT1 Wait on DSM. Note - This waiting period was due to bridge being out on the Kuparuk River. 11:30 - 12:30 1.00 DRILL P INT1 PJSM w/DSM personnel. PJU lubricator, pull TWC, & PJD lubricator. 12:30 - 13:00 0.50 DRILL P INT1 PJU to U-tube diesel. 13:00 - 14:30 1.50 DRILL N WAIT INT1 Wait on HB&R (hot oil service). 14:30 - 15:30 1.00 DRILL P i lNT1 PJSM. R/U HB&R hot oil service. Freeze protect w/78 Bbls diesel (pumped @ 1.8 bpm @ 725 psi). 15:30 - 17:30 2.00 DRILL P INT1 U-tube diesel & blow down lines. 17:30 - 18:30 1.00 DRILL P INT1 Install back pressure valve & pressure test from below to 1800 psi - OK. 18:30 - 19:30 1.00 DRILL P INT1 Remove secondary annular valve & secure well. 19:30 - 00:00 4.50 DRILL P INT1 Rig released @ 1930 Hrs to move to W - 21A. Printed: 6/11/2001 2:51:01 PM DEFINITIVE North Slope Alaska Alaska Drilling & Wells PBU_WOA W Pad, Slot W-201 W-20? Job No. AKZZIO16$, Surveyed: 6 June, 2001 S UR VEY REPORT June, 2001 Your Ref: API500292300700 Surface Coordinates: 5959805.74 N, 612048.94 E (70° 17' 56.8811" N, 149° 05' 33.1444" W) Kelly Bushing: 81.30ft above Mean Sea Level R£C£1V£D AUG 09 2.001 Alaska Oit E Gas COns. commission Anchorage DRILLIN6 SERVICES A Halliburton Company Survey Ref: svy10846 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) 0.00 0.000 0.000 -81.30 202.04 0.060 186.280 120.74 293.56 0.620 112.690 212.26 388.33 1.560 111.670 307.01 481.58 1.930 110.180 400.22 Vertical Depth (ft) 0.00 202.04 293.56 388.31 481.52 575.55 2.090 91.540 494.13 575.43 669.23 2.620 81.090 587.73 669.03 762.98 2.710 75.740 681.38 762.68 855.58 2.790 78.520 773.87 855.17 886.68 2.840 76.760 804.94 886.24 978.34 3.410 72.970 896.46 977.76 1072.46 4.030 66.940 990.38 1071.68 1164.13 3.900 46.950 1081.84 1163.14 1257.42 4.730 46.070 1174.86 1256.16 1349.52 7.350 53.660 1266.44 1347.74 1443.61 9.860 54.450 1359.47 1440.77 1628.72 12.660 52.740 1540.99 1622.29 1723.46 12.700 54.660 1633.42 1714.72 1818.21 14.840 55.300 1725.45 1806.75 1907.91 19.540 54.140 1811.12 1892.42 Sperry-Sun Drilling Services Survey Report for W-201 Your Ref: API500292300700 Job No. AKZZfOf63, Surveyed: 6 June, 200f DEFINITIVE Alaska Drilling & Wells PBU WOA W Pad 2003.08 19.930 53.020 1900.70 1982.00 2097.15 21.730 52.480 1988.61 2069.91 2188.98 22.430 54.090 2073.71 2155.01 2282.91 26.480 53.050 2159.20 2240.50 2376.72 32.250 52.330 2240.92 2322.22 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) Dogleg Rate (°/'~OOft) Vertical Section Comment 2469.16 38.310 54.300 2316.35 2397.65 2560.87 42.470 55.680 2386.18 2467.48 2658.02 46.530 57.130 2455.46 2536.76 2752.02 51.370 56.680 2517.18 2598.48 2816.81 53.570 56.640 2556.64 2637.94 0.00 N 0.00 E 5959805.74 N 612048.94 E 0.11S 0.01W 5959805.63 N 612048.93 E 0.34 S 0.44E 5959805.40 N 612049.39 E 1.02 S 2.11 E 5959804.75 N 612051.07 E 2.03 S 4.77 E 5959803.78 N 612053.74 E 0.030 0.662 0.992 O.4OO 0.00 -0.06 0.22 1.37 3.22 AK-6 BP IFR-AK 2.62 S 7.96 E 5959803.24 N 612056.94 E 2.33 S 11.79 E 5959803.58 N 612060.76 E 1.46 S 16.05 E 5959804.52 N 612065.01 E 0.47 S 20.38 E 5959805.57 N 612069.33 E 0.14 S 21.87 E 5959805.92 N 612070.81 E 0.713 0.726 0.282 0.168 0.321 5.75 9.25 13.41 17.69 19.16 1.18 N 26.69 E 5959807.31N 612075.61 E 3.29 N 32.41E 5959809.51N 612081.30 E 6.68 N 37.65 E 5959812.98 N 612086.49 E 11.52 N 42.74 E 5959817.89 N 612091.50 E 17.64 N 50.22 E 5959824.13 N 612098.89 E 0.661 0.778 1.507 0.892 2.968 24.02 30.06 36.28 43.06 52.56 25.89 N 61.63 E 5959832.55 N 612110.17 E 47.39 N 90.67 E 5959854.48 N 612138.90 E 59.70 N 107.43 E 5959867.04 N 612155.47 E 72.64N 125.90 E 5959880.25 N 612173.75 E 87.97 N 147.52 E 5959895.90 N 612195.13 E 2.671 1.523 O.447 2.264 5.253 66.52 102.30 122.90 145.30 171.62 107.05 N 173.37 E 5959915.37 N 612220.70 E 127.31N 200.00 E 5959936.01N 612247.02 E 147.93 N 227.67 E 5959957.05 N 612274.38 E 171.04N 258.93 E 5959980.62 N 612305.29 E 198.93 N 295.49 E 5960009.06 N 612341.43 E 0.571 1.924 1.008 4.336 6.162 203.44 236.50 270.66 309.16 354.59 230.76 N 338.32 E 5960041.52 N 612383.78 E 264.82 N 387.00 E 5960076.30 N 612431.95 E 302.46 N 443.72 E 5960114.78 N 612488.10 E 341.16 N 503.08 E 5960154.37 N 612546.88 E 369.40 N 546.01 E 5960183.24 N 612589.38 E 6.669 4.639 4.308 5.162 3.396 407.41 466.44 534.25 6O4.89 656.08 15 June, 2001 - 13:11 Page 2 of 6 DrillQuest 2.00.08.005 Sperry-Sun DnTling Services Survey Report for W-201 Your Ref: API500292300700 Job No. AKZZfO'I63, Surveyed: 6 June, 200'i North Slope Alaska Measured Depth (ft) Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 2929.20 52.830 56.010 2623.97 2705.27 3019.77 56.520 52.290 2676.34 2757.64 3115.40 57.130 50.480 2728.67 2809.97 3207.80 57.020 48.630 2778.90 2860.20 3300,69 56.040 47.950 2830.13 2911.43 3395.27 54.100 47.730 2884.28 2965.58 3476.65 53.300 47.410 2932.46 3013.76 3579.70 52.500 47.240 2994.62 3075.92 3674,20 52.760 47.270 3051.97 3133.27 3766.68 56.860 49.880 3105.26 3186.56 3859,91 56.710 49.710 3156.33 3237.63 3951.13 56.570 50.090 3206.49 3287,79 4044.28 56.850 49.260 3257.62 3338.92 4138.33 57.020 49.800 3308.94 3390.24 4232.17 57.010 49.890 3360.02 3441.32 4324.30 55.100 50.590 3411.47 3492.77 4417,14 54.270 51.180 3465.14 3546.44 4510.42 51.360 52.920 3521.51 3602.81 4602.76 50.600 53.630 3579.65 3660.95 4698.35 53.150 53.960 3638.66 3719.96 4792.04 55.590 54.050 3693.23 3774.53 4886.31 55.580 54.160 3746.51 3827.81 4980.28 55.540 54.640 3799.66 3880.96 5072.15 55.950 54.350 3851.37 3932.67 5164.54 56.230 54.390 3902.91 3984.21 5257.33 56.420 53.930 3954.36 4035.66 5355.02 57.420 53.960 4007.68 4088.98 5447.52 57.490 53.570 4057.44 4138.74 5540.13 57.340 53.600 4107.32 4188.62 5631.85 57.590 53.090 4156.65 4237.95 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 419.30 N 620.90 E 5960234.25 N 612663.52 E 462.60 N 680.73 E 5960278.44N 612722.70 E 512.55 N 743.27 E 5960329.32 N 612784.48 E 562.86 N 802.29 E 5960380.50 N 612842.75 E 614.42 N 860.14 E 5960432.91 N 612899.82 E 666.46 N 917.61E 5960485.81N 612956.51E 710.71N 966.02 E 5960530.77 N 613004.26 E 766.42 N 1026.45 E 5960587.38 N 613063.85 E 817.39 N 1081.60 E 5960639.17 N 613118.24 E 867.35 N 1138.28 E 5960689.96 N 613174.16 E 917.70 N 1197.85 E 5960741.20 N 613232.98 E 966.77 N 1256.13 E 5960791.14 N 613290.52 E 1017.16 N 1315.49 E 5960642.40 N 613349.12 E 1068.32 N 1375.46 E 5960894.45 N 613408.31 E 1119.08 N 1435.62 E 5960946.10 N 613467.71 E 1167.96 N 1494.36 E 5960995.85 N 613525.72 E 1215.75 N 1553.14 E 5961044.52 N 613583.78 E 1261.47 N 1611.72 E 5961091.10 N 613641.67 E 1304.37 N 1669.22 E 5961134.85 N 613698.52 E 1348.78 N 1729.89 E 5961180.16 N 613758.53 E 1393.53 N 1791.50 E 5961225.82 N 613819.46 E 1439.12 N 1854.50 E 5961272.36 N 613881.77 E 1484.24 N 1917.51 E 5961318.40 N 613944.11 E 1528.34N 1979.33 E 5961363.42 N 614005.26 E 1573.01 N 2041.65 E 5961409.01 N 614066.91 E 1618.22 N 2104.25 E 5961455.16 N 614128.82 E 1666.40 N 2170.42 E 5961504.31N 614194.27 E 1712.49 N 2233.32 E 5961551.34 N 614256.47 E 1758.81N 2296.11E 5961598.59 N 614318.57 E 1804.97 N 2358.15 E 5961645.67 N 614379.91 E Dogleg Rate (°/100ft) O.797 5.274 1.708 1.685 1.219 2.060 1.033 0.787 0.276 4.997 0.222 0,380 0.803 0.514 0.081 2.167 1.034 3.455 1.017 2.681 2.606 0.097 0.423 0.517 0.305 0.461 1.024 0.363 0.164 O.542 Alaska Drilling & Wells PBU WOA W Pad Vertical Section Comment 745.7O 818.95 897.73 973.60 1049.03 1124.37 1188.02 1267.70 1340.49 1414.13 1490.50 1565.13 1641.33 1718.43 1795.52 1870.47 1944.92 2018.20 2089.20 2163.71 2239.20 2316.32 2393.22 2468.59 2544.67 2621.25 2702.39 2779.65 2856.94 2933.48 15 June, 2001 - 13:11 Page 3 of 6 DrillOt~est 2.00.08.005 Sperry-Sun Drilling Services Survey Report for W-20'l Your Ref: AP1500292300700 Job No. AKZZ10163, Surveyed: 6 June, 2001 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 5726.72 57.120 53.690 4207.82 4289.12 5819.89 55.450 54.080 4259.54 4340.84 5914.13 55.980 53.660 4312.62 4393.92 6007.55 56.680 53.910 4364.41 4445.71 6100.18 54.310 53.950 4416.88 4498.18 6192.19 55.150 53.680 4470.01 4551.31 6285.25 53.480 53.580 4524.29 4605.59 6378.92 51.990 53.730 4581.01 4662.31 6470.91 52.390 53.700 4637.40 4718.70 6563,04 52.720 51.570 4693.42 4774.72 6658,24 53.350 50.190 4750.67 4831.97 6752.40 54.420 50.270 4806.17 4887.47 6845.50 56.590 54.080 4858,91 4940.21 6938.74 58.240 56.050 4909.12 4990.42 7031.44 62.630 57.930 4954.85 5036.15 7124.67 66,850 61.180 4994.64 5075.94 7217.74 69.160 62.710 5029.49 5110.79 7312.87 71.580 66.130 5061.46 5142.76 7406.15 75.200 68.140 5088.12 5169.42 7499,55 78.220 70.740 5109.59 5190.89 7593.48 80.790 73.950 5126.70 5208.00 7646.95 83.890 75.060 5133.83 5215.13 7796.01 88.650 76.090 5143.52 5224.82 7827.34 88.830 76.650 5144.21 5225.51 7919.44 88.340 74.500 5146.49 5227.79 8012.97 88.830 75.300 5148.80 5230.10 8105.05 87.780 76.310 5151.52 5232.82 8198.94 88 950 77.800 5154.20 5235.50 8292.98 88.830 80.200 5156.02 5237.32 8387.27 90 250 80.120 5156.78 5238.08 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 1852.61N 2422.27'E 5961694.26 N 614443.31E 1898,29 N 2484.87 E 5961740.87 N 614505.23 E 1944.20 N 2547.76 E 5961787.72 N 614567.43 E 1990.14 N 2610.49 E 5961834.58 N 614629.46 E 2035.08 N 2672.18 E 5961880.44 N 614690.48 E 2079.43 N 2732.81 E 5961925.69 N 614750.44E 2124.25 N 2793.67 E 5961971.41 N 614810.63 E 2168.43 N 2853.72 E 5962016.48 N 614870.01 E 2211.44 N 2912.30 E 5962060,36 N 614927.94 E 2255.83 N 2970.43 E 5962105.61 N 614985.40 E 2303.82 N 3029.44 E 5962154.48 N 615043.69 E 2352.48 N 3087.90 E 5962204.00 N 615101.42 E 2399.49 N 3148.51E 5962251.91N 615161.32 E 2444.47 N 3212.91 E 5962297.84N 615225.05 E 2488.35 N 3280.52 E 5962342.73 N 615291.99 E 2531.02 N 3353.20 E 5962386.48 N 615364.03 E 2571.60 N 3429.36 E 5962428.19 N 615439.57 E 2610.26 N 3510.16 E 5962468.05 N 615519.79 E 2644.97 N 3592.51 E 5962503.98 N 615601.62 E 2676.87 N 3677,61E 5962537.15 N 615686.23 E 2704.87 N 3765.60 E 5962566.45 N 615773.79 E 2719.02 N 3816.66 E 5962581.37 N 615824.63 E 2756.06 N 3960.67 E 5962620.55 N 615968.08 E 2763.44 N 3991.11E 5962628.38 N 615998.41 E 2786.38 N 4080.28 E 5962652.65 N 616087.22 E 2810.73 N 4170.55 E 5962678.35 N 616177.12 E 2833.30 N 4259.78 E 5962702.24 N 616266,00 E 2854.33 N 4351.24 E 5962724.63 N 616357.14 E 2872.26 N 4443.53 E 5962743.94 N 616449.15 E 2888.38 N 4536.43 E 5962761.44 N 616541.79 E Dogleg Rate (°/100ft) 0.727 1.826 0.672 0.782 2.559 0.944 1.797 1.596 0.436 1.870 1.334 1.138 4.099 2.510 5.053 5.515 2.913 4.235 4.396 4.218 4.333 6.152 3.267 1.877 2.394 1.003 1.582 2.017 2.555 1.508 Alaska Drilling & Wells PBU WOA W Pad Vertical Section Comment 3012.55 3089.36 3166.54 3243.58 3319.24 3393.68 3468.55 3542.39 3614.39 3686.65 3761.41 3836.00 3911.69 3989.75 4070.10 4154.34 4240.62 4330.08 4419.02 4509.03 4599.72 4651.35 4795.60 4825.88 4915.19 5006.15 5095.34 5185.76 5275.43 5364.77 15 June, 2001 - 13:11 Page 4 of 6 DrillQuest 2.00.08.005 Sperry. Sun Drilling Services Survey Report for W-201 Your Ref: API500292300700 Job No. AKZZfOf63, Surveyed: 6 June, 200f North Slope Alaska Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings N0rthings Eastings (ft) (ft) (ft) (ft) 8479.51 89,940 78.920 5156.63 5237.93 2905.16 N 4627.12 E 5962779.57 N 616632.23 E 8573.87 89.750 79.380 5156.88 5238.18 2922.92 N 4719.80 E 5962798.71 N 616724.63 E 8667.51 89.630 78.990 5157.39 5238.69 2940.49 N 4811.77 E 5962817.65 N 616816.33 E 8760,84 88.770 77.900 5158.69 5239.99 2959.18 N 4903.20 E 5962837.70 N 616907.47 E 8854.81 89.820 80.490 5159.85 5241.15 2976.79 N 4995.49 E 5962856.69 N 616999.49 E 8946.07 92.150 80.020 5158.28 5239.58 2992.24 N 5085.41E 5962873.47 N 617089.17 E 9040.80 86.370 76.180 5159.50 5240.80 3011.75 N 5178.04E 5962894.37 N 617181.50 E 9133.55 84.450 77.240 5166.92 5248.22 3033.01 N 5268.01 E 5962916.96 N 617271.14 E 9227.02 83.280 75.530 5176.91 5258.21 3054.88 N 5358.33 E 5962940.18 N 617361.12 E 9319.39 87.540 73.240 5184.31 5265.61 3079.66 N 5446.98 E 5962966.28 N 617449.39 E Dogleg Rate (°/100ft) 1.344 0.527 o.436 1.488 2.974 2.605 7.324 2.363 2.208 5.232 9413,04 87.720 71.850 5188.18 5269.48 3107.73 N 5536.24 E 5962995.67 N 617538.22 E 9507.01 87.110 73.680 5192.42 5273.72 3135.54N 5625.89 E 5963024.82 N 617627.45 E 9600.93 87.350 75,380 5196.96 5278.26 3160.56 N 5716.30 E 5963051.19 N 617717.48 E 9693.60 88.030 75.430 5200.69 5281.99 3183.90 N 5805.91 E 5963075.85 N 617806.73 E 9782.78 87.660 75.110 5204.04 5285.34 3206.55 N 5892.09 E 5963099.79 N 617892.57 E 1.495 2.051 1.826 0.736 0.548 9880.20 87.850 75.900 5207.86 5289.16 3230.92 N 5986.34 E 5963125.56 N 617986.44E 9972.25 86.430 75.440 5212.45 5293.75 3253.67 N 6075.41 E 5963149.64N 618075.16 E 10064.00 86.180 75.710 5218.37 5299.67 3276.48 N 6164.09 E 5963173.77 N 618163.49 E 10156.93 85.440 75.000 5225.16 5306.46 3299.91 N 6253.75 E 5963198.53 N 618252.80 E 10248.08 84.890 74.960 5232.84 5314.14 3323.45 N 6341.48 E 5963223.38 N 618340.16 E 0.833 1.621 0.401 1.102 0.605 10270.12 84.830 75.420 5234.81 5316.11 3329.06 N 6362.70 E 5963229.31N 618361.29 E 10343.00 84.830 75.420 5241.38 5322.68 3347.33 N 6432.95 E 5963248.62 N 618431.26 E 2.096 0.000 All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.443° (20-May-01) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 61.520° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 10343.00ft., 15 June, 2001 - 13:11 Page 5 of 6 Alaska Drilling & Wells PBU WOA W Pad Vertical Section Comment 5452.50 5542.42 5631.65 5720.92 5810.44 5896.85 5987.57 6O76.79 6166.61 6256.35 6348.19 6440.26 6531.66 6621.54 6708.11 6802.57 6891.71 6980.53 7070.52 7158.85 7180.18 725O.64 Projected Survey DrillOuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for W-201 Your Ref: API500292300700 Job No. AKZZ10163, Surveyed: 6 June, 2001 North Slope Alaska The Bottom Hole Displacement is 7251.72ft., in the Direction of 62.510° (True). Alaska Drilling & Wells PBU WOA W Pad Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 10343.00 532268 3347.33 N 6432.95 E Comment Projected Survey Survey tool program for W-201 From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0.00 10343.00 5322.68 Survey Tool Description AK-6 BP_IFR-AK 15 June, 2001 - 13:11 Page 6 of 6 Dr#lQ,est 2.00.08.005 North Slope Alaska Alaska Drilling & Wells PBU_WOA W Pad, Slot W-201 W-201 MWD Job No. AKMMf0161, Surveyed: 6 June, 2001 S UR VEY REPORT June, 200~ Your Ref: AP1-500292300700 Surface Coordinates: 5959805.74 N, 6f2048.94 E (70° 17' 56.8811" N, ~49° 05' 33.1444" I/V) Kelly Bushing: 81.3Oft above Mean Sea Level DRILLING SERVICES Survey Ref: svy10843 A Hs~lllburton Company Sperry-Sun Drilling Services Survey Report for W-2OI_MWD Your Ref: API-500292300700 Job No. AKMMfOf6f, Surveyed: 6 June, 2001 North Slope Alaska Measured Depth (ft) Sub-Sea Depth (ft) Vertical Depth (ft) 0.00 0.000 0.000 -81.30 0.00 202.04 0.060 186.180 120.74 202.04 293.56 0.620 112,640 212.26 293.56 388.33 1.560 111,780 307.01 388.31 481.58 1.930 110,310 400.22 481.52 575.55 2.090 91.250 494.13 575.43 669.23 2.620 81.170 587.73 669.03 762.98 2,710 76.050 681.38 762.68 855.58 2.790 78.750 773.87 855.17 886.68 2.840 76.960 804.94 886.24 978.34 3,410 73.220 896.46 977.76 1072.46 4.030 66.420 990.38 1071.68 1164.13 3.900 46.540 1081.84 1163.14 1257.42 4.730 45,810 1174.86 1256.16 1349.52 7.350 53.230 1266.44 1347.74 1443.61 9,860 54,060 1359.47 1440.77 1628.72 12.660 52.600 1540.99 1622.29 1723.46 12.700 54.540 1633.42 1714.72 1818.21 14,840 55.460 1725,45 1806.75 1907.91 19.540 54.440 1811.12 1892.42 2003.08 19.930 53.250 1900.70 1982.00 2097.15 21.730 52.390 1988.61 2069.91 2188.98 22.430 53.760 2073.71 2155.01 2282.91 26.480 52.430 2159.20 2240.50 2376.72 32.250 51,860 2240.92 2322.22 2469.16 38.310 53.740 2316.35 2397.65 2560.87 42.470 55.030 2386.18 2467.48 2658.02 46.530 56.640 2455.46 2536.76 2752.02 51.370 56.440 2517.18 2598.48 2816.81 53.570 56.360 2556.64 2637.94 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 0.00 N 0.00 E 5959805.74 N 612048.94 E 0.11S 0.01W 5959805.63 N 612048.93 E 0.34 S 0.44E 5959805.40 N 612049.39 E 1.02 S 2.11 E 5959804.75 N 612051.07 E 2.04 S 4.76 E 5959803.78 N 612053.73 E 2.62 S 7.96 E 5959803.24 N 612056.94E 2.33 S 11.78 E 5959803.59 N 612060.76 E 1.47 S 16.05 E 5959804.51 N 612065.01 E 0.50 S 20.39 E 5959805.54N 612069.33 E 0.18 S 21.88 E 5959805.89 N 612070.82 E 1.12 N 26.70 E 5959807.26 N 612075.62 E 3.25 N 32.41 E 5959809.47 N 612081.30 E 6.69 N 37.63 E 5959812.99 N 612086.46 E 11.55 N 42.69 E 5959817.92 N 612091.45 E 17.72 N 50.13 E 5959824.21 N 612098.80 E 26.06 N 61.48 E 5959832.71 N 612110.02 E 47.68 N 90.43 E 5959854.77 N 612138.65 E 60.03 N 107.16 E 5959867.36 N 612155.19 E 72.95 N 125.64E 5959880.56 N 612173.48 E 88.20 N 147.32 E 5959896.13 N 612194.93 E 107.16 N 173.26 E 5959915.47 N 612220.59 E 127.38 N 199.91 E 5959936.09 N 612246.93 E 148.11N 227.50 E 5959957.23 N 612274.21E 171.49 N 258.57 E 5959981.06 N 612304.92 E 199.72 N 294.86 E 5960009.83 N 612340.79 E 231.93 N 337.40 E 5960042.67 N 612382.85 E 266.50 N 385.72 E 5960077.96 N 612430.64E 304.70 N 442.06 E 5960117.00 N 612486,41 E 343.78 N 501.18 E 5960156.95 N 612544.94 E 372.21 N 543.98 E 5960186.02 N 612587.31 E Dogleg Rate (°/'~OOft) 0.030 0.662 0.992 0.400 0.728 0.716 0.271 0.164 0.325 0.660 0.807 1.499 0.892 2.963 2.671 1.520' 0.451 2.270 5.250 0.588 1.941 0.946 4,351 6.158 6.659 4.627 4.337 5.151 3.397 Alaska Drilling & Wells PBU WOA W Pad Vertical Section Comment 0.00 -0.06 0.23 1.40 3.28 5.84 9,36 13.54 17.83 19.30 24.18 30.23 36.44 43.18 52.64 66.55 102.23 122.78 145.15 171.42 203.20 236.18 270.25 308.61 353.85 406.48 465.32 532.96 603.46 654.55 MWD Magnetic 18 June, 2001.8:57 Page 2 of 6 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for W-2Of_MWD Your Ref: API-500292300700 Job No. AKMMfOf6f, Surveyed: 6 June, 200'/ North Slope Alaska Measured Depth (ft) Sub-Sea Depth (ft) Vertical Depth (ft) 2929.20 52.830 55.850 2623.97 2705.27 3019.77 56.520 52.210 2676.34 2757.64 3115.40 57.130 50.440 2728.67 2809.97 3207.80 57.020 48.630 2778.90 2860.20 3300.69 56.040 48.060 2830.12 2911.42 3395.27 54.100 47.830 2884.28 2965.58 3476.65 53.300 47.570 2932.45 3013.75 3579.70 52.500 47.560 2994.61 3075.91 3674.20 52.760 47.600 3051.97 3133.27 3766.68 56.860 50.380 3105.26 3186.56 3859.91 56.710 49.490 3156.33 3237.63 3951.13 56.570 49.880 3206.49 3287.79 4044.28 56.850 48.570 3257.62 3338.92 4138.33 57.020 49,070 3308.94 3390.24 4232.17 57.010 49.380 3360.03 3441.33 4324.30 55.100 50.150 3411.47 3492.77 4417.14 54.270 50.750 3465.14 3546.44 4510.42 51.360 52.610 3521.51 3602.81 4602.76 50.600 53.240 3579.65 3660.95 4698.35 53.150 53.580 3638.66 3719.96 4792.04 55.590 53.670 3693.23 3774.53 4886.31 55.580 53.780 3746.51 3827.81 4980.28 55.540 54.260 3799.66 3880.96 5072.15 55.950 54.010 3851.37 3932.67 5164.54 56.230 54.100 3902.91 3984.21 5257.33 56.420 53.730 3954.36 4035.66 5355.02 57.420 53.830 4007.68 4088.98 5447.52 57.490 53.490 4057.44 4138.74 5540.13 57.340 53.470 4107.32 4188.62 5631.85 57.590 53.030 4156.65 4237.95 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 422.40 N 618.68 E 5960237.32 N 612661.25 E 465.82 N 678.43 E 5960281.63 N 612720.34E 515.84N 740.91 E 5960332.57 N 612782.07 E 566.17 N 799.91 E 5960383.78 N 612840.32 E 617.67 N 857.81 E 5960436.13 N 612897.44E 669.61 N 915.38 E 5960488.92 N 612954.23 E 713.75 N 963.89 E 5960533.78 N 613002.08 E 769.21 N 1024.55 E 5960590.14 N 613061.91 E 819.87 N 1079.99 E 5960641.62 N 613116.59 E 869.41N 1137.03 E 5960692.00 N 613172.88 E 919.61N 1196.72 E 5960743.09 N 613231.82 E 968.90 N 1254.82 E 5960793.25 N 613289.17 E 1019.76 N 1313.78 E 5960844.97 N 613347.37 E 1071.65 N 1373.10 E 5960897.75 N 613405.91E 1123.06 N 1432.71 E 5960950.04N 613464.75 E 1172.43 N 1491.05 E 5961000.27 N 613522.34E 1220.67 N 1549.46 E 5961049.37 N 613580.03 E 1266.76 N 1607.74 E 5961096.33 N 613637.61 E 1310.01 N 1664.98 E 5961140.43 N 613694.20 E 1354.82 N 1725.35 E 5961186.14 N 613753.90 E 1399.98 N 1786.66 E 5961232.21N 613814.53 E 1446.00 N 1849.36 E 5961279.15 N 613876.53 E 1491.53 N 1912.07 E 5961325.61 N 613938.56 E 1536.01N 1973.61E 5961371.01N 613999.43 E 1581.02 N 2035.68 E 5961416.94 N 614060.82 E 1626.50 N 2098.09 E 5961463.35 N 614122.54E 1674.87 N 2164.12 E 5961512.69 N 614187.85 E 1721.08 N 2226.93 E 5961559.83 N 614249.96E 1767.51 N 2289.64 E 5961607.20 N 614311.97 E 1813.78 N 2351.60 E 5961654.38 N 614373.24 E Dogleg Rate (°/100ft) 0.752 5.229 1.675 1.649 1.173 2.061 1.016 0.776 0.277 5.068 0.815 0.389 1.213 0.481 0.277 2.186 1.038 3.501 0.979 2.682 2.606 0.097 0.423 0.500 0.314 0.390 1.027 0.319 0.163 0.488 Alaska Drilling & Wells PBU WOA W Pad Vertical Section Comment 744.01 817.08 895.63 971.25 1046.42 1121.52 1184.96 1264.42 1337.04 1410.55 1486.71 1561.04 1636.86 1713.48 1790.13 1864.71 1938.83 2011.84 2082.61 2156.88 2232.14 2309.02 2385.7O 2460.85 2536.72 2613.10 2694.03 2771.11 2848.2O 2924.55 18 June, 2001 - 8:57 Page 3 of 6 Dr#lQ,est 2.00.08.005 Sperry. Sun Drilling Services Survey Report for W-2Of_MWD Your Ref: API-500292300700 Job No. AKMMfOf6f, Surveyed: 6 June, 200f North Slope Alaska Measured Depth (ft) Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 5726.72 57.120 52.900 4207.82 4289.12 5819.89 55.450 53.400 4259.54 4340.84 5914,13 55.980 52.970 4312.62 4393.92 6007.55 56.680 53.280 4364.42 4445.72 6100.18 54.310 53.430 4416.88 4498.18 6192.19 55.150 53.240 4470.01 4551.31 6285.25 53.480 53.210 4524.30 4605.60 6378.92 51.990 53.390 4581.01 4662.31 6470.91 52.390 53.330 4637.41 4718.71 6563.04 52.720 51.310 4693.42 4774.72 6658.24 53.350 49.930 4750.67 4831.97 6752.40 54.420 50.260 4806.17 4887.47 6845.50 56.590 53.430 4858.90 4940.20 6938.74 58.240 55.190 4909.12 4990.42 7031.44 62.630 57.250 4954.85 5036.15 7124.67 66.850 60.790 4994.63 5075.93 7217.74 69.160 62.270 5029.49 5110.79 7312.87 71.580 65.700 5061.46 5142.76 7406.15 75.200 67.720 5088.12 5169.42 7499.55 78.220 70.390 5109.59 5190.89 7593.48 80.790 73.750 5126.70 5208.00 7646.95 83.890 74.880 5133.83 5215.13 7796.01 88.650 76.450 5143.52 5224.82 7827.34 88.830 76.960 5144.21 5225.51 7919.44 88.340 74.330 5146,49 5227.79 8012.97 88.830 75.150 5148.80 5230.10 8105.05 87.780 76.160 5151.52 5232.82 8198.94 88.950 77.650 5154.20 5235.50 8292.98 88.830 80.040 5156.02 5237.32 8387.27 90.250 79.960 5156.78 5238.08 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 1861.89 N 2415.37 E 5961703.44N 614436.28 E 1908.37 N 2477,38 E 5961750.84N 614497.59 E 1955.03 N 2539.72 E 5961798,42 N 614559.22 E 2001.69 N 2601.91 E 5961846.00 N 614620.72 E 2047.24 N 2663.15 E 5961892.47 N 614681.27 E 2092.10 N 2723.41 E 5961938.22 N 614740.85 E 2137.35 N 2783.95 E 5961984.36 N 614800.71 E 2181.90 N 2843.72 E 5962029.80 N 614859.81 E 2225.27 N 2902.03 E 5962074.04 N 614917.47 E 2269.98 N 2959.92 E 5962119.61N 614974.68 E 2318.24 N 3018.71E 5962168.74 N 615032.74 E 2367.04 N 3077,06 E 5962218.40 N 615090.36 E 2414.41 N 3137.40 E 5962266.66 N 615149.99 E 2460.23 N 3201.20 E 5962313.43 N 615213.10 E 2505.02 N 3268.22 E 5962359.21N 615279.44E 2548.36 N 3340.50 E 5962403.63 N 615351.07 E 2589.49 N 3416.35 E 5962445.88 N 615426.30 E 2628.76 N 3496.86 E 5962486.35 N 615506.22 E 2664.08 N 3578.95 E 5962522.89 N 615587.77 E 2696.55 N 3663.83 E 5962556.62 N 615672.16 E 2724.97 N 3751.69 E 5962586.35 N 615759.58 E 2739.29 N 3802.70 E 5962601.43 N 615810.37 E 2776.10 N 3946.77 E 5962640.38 N 615953.88 E 2783.31 N 3977.25 E 5962648.04 N 615984.25 E 2806.13 N 4066.44E 5962672.19 N 616073,09 E 2830.74 N 4156.65 E 5962698.14 N 616162.92 E 2853.54N 4245.81 E 5962722.27 N 616251.73 E 2874.81 N 4337.22 E 5962744.90 N 616342.81 E 2892.99 N 4429.46 E 5962764.46 N 616434.77 E 2909.37 N 4522.31E 5962782.21N 616527.37 E Dogleg Rate (°/100ft) 0.509 1.847 O.677 0.799 2.562 0.928 1.795 1.598 0.438 1.777 1.334 1.171 3.648 2.379 5.115 5.681 2.887 4.243 4.401 4.265 4.456 6.164 3.362 1.726 2.904 1.021 1.582 2.017 2.544 1.508 Alaska Drilling & Wells PBU WOA W Pad Vertical Section Comment 3003.36 3079.85 3156.72 3233.45 3308.84 3383.03 3457.65 3531.26 36O3.O4 3675.O5 3749.52 3823.84 3899.27 3977.05 4057.19 4141.33 4227.61 4317.15 4406.26 4496.52 4587.53 4639.37 4784.O9 4814.43 4904.04 4995.37 5084.95 5175.79 5265.95 5355.81 18 June, 2001 - 8:57 Page 4 of 6 DriilOuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for W-2OI_MWD Your Ref: API-500292300700 Job No. AKMM'i016'I, Surveyed: 6 June, 2001 North Slope Alaska Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 8479.51 89,940 78.770 5156.63 5237.93 2926.39 N 4612.97 E 5962800.59 N 616617.76 E 8573.87 89.750 79.230 5156.88 5238.18 2944.39 N 4705.59 E 5962819.97 N 616710.11 E 8667.51 89.630 78.830 5157.39 5238.69 2962.21 N 4797.52 E 5962839.16 N 616801.76 E 8760.84 88.770 77.760 5158.69 5239.99 2981.14 N 4888.90 E 5962859.45 N 616892.84 E 8854.81 89.820 80.350 5159.85 5241.15 2998.98 N 4981.14 E 5962878.66 N 616984.81 E 8946.07 92.150 79.930 5158.28 5239.58 3014.61 N 5071.03 E 5962895.62 N 617074.46 E 9040.80 86.370 76.060 5159.50 5240.80 3034.29 N 5163.63 E 5962916.69 N 617166.75 E 9133.55 84.450 77.130 5166.92 5248.22 3055.73 N 5253.56 E 5962939.46 N 617256.35 E 9227.02 83.280 75.500 5176.91 5258.21 3077.71 N 5343.85 E 5962962.79 N 617346.30 E 9319.39 87,540 73.270 5184.31 5265.61 3102.49 N 5432.50 E 5962988.89 N 617434.57 E 9413.04 87.720 71.860 5188.18 5269.48 3130.53 N 5521.77 E 5963018.25 N 617523.41 E 9507.01 87.110 73.710 5192.42 5273.72 3158.31 N 5611.43 E 5963047.37 N 617612.65 E 9600.93 87.350 75.350 5196.96 5278.26 3183.33 N 5701,84E 5963073.74 N 617702.68 E 9693.60 88.030 75.390 5200.69 5281.99 3206.72 N 5791.43 E 5963098.46 N 617791.91 E 9782.78 87.660 75.080 5204.04 5285.34 3229.43 N 5877,60 E 5963122.45 N 617877.74 E 9880.20 87.850 75.860 5207.86 5289.16 3253.85 N 5971.84E 5963148.28 N 617971.59 E 9972.25 86.430 75.400 5212.45 5293.75 3276.67 N 6060.89 E 5963172.42 N 618060.30 E 10064,00 86.180 75.730 5218.37 5299.67 3299.49 N 6149.56 E 5963196.56 N 618148.62 E 10156.93 85.440 75.030 5225.16 5306.46 3322.89 N 6239,24 E 5963221.29 N 618237,94E 10248.08 84.890 74.990 5232.84 5314.14 3346.38 N 6326.97 E 5963246.09 N 618325.31 E 10270.12 84.830 75.440 5234.81 5316.11 3351.98 N 6348.20 E 5963252.00 N 618346.45 E 10343.00 84.830 75.440 5241.38 5322.68 3370.23 N 6418.45 E 5963271.30 N 618416.43 E All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vedical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.443° (20-May-01) The Dogleg Severity is in Degrees per 100 feet (US). Vedical Section is from Well and calculated along an Azimuth of 62.374° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 10343.00ft., 18 June, 2001 - 8:57 Page 5 of 6 Dogleg Rate (°/100ft) 1.333 0.527 0.446 1.471 2.974 2.594 7.342 2.368 2.138 5.202 1.517 2.071 1.763 0.735 0.541 0.823 1.621 0.451 1.095 0.605 2.052 0.000 Alaska Drilling & Wells PBU WOA W Pad Vertical Section Comment 5444.02 5534.43 5624.14 5713.88 5803.88 589O.77 5981.94 6071.55 6161.74 6251.78 6343.87 6436.19 6527.9O 6618.12 6705.00 6799.81 6889.29 6978.44 7068.74 7157.37 7178.77 7249.47 Projected survey DdllQ,est 2.00.08.005 Sperry-Sun Drilling Services Survey Report for W-2Of_MVI/D Your Reft API-500292300700 Job No. AKMMfOf6f, Surveyed: 6 June, 200'/ North Slope Alaska The Bottom Hole Displacement is 7249.48ft., in the Direction of 62.297° (True). Alaska Drilling & Wells PBU WOA W Pad Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 10343.00 5322.68 3370.23 N 6418.45 E Comment Pr~ected survey Survey tool program for W-2OI_MWD · F r om T o Measured VeAical Measured VeAical Depth Depth Depth Depth (fi) (fi) (fi) (fi) 0.00 0.00 10343.00 5322.68 Survey Tool Description MWD Magnetic 18 June, 2001 - 8:57 Page 6 of 6 DrillQuest 2.00.08.005 07/11101 Schlmberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. t282 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Aurora Polaris Well Job # Log Description Date Color Sepia BL CD S-t08 ,~O1~'/~ 21315 CMR 06/19/01 2 S-t06 ~ / .~ 21317 RST .. 06116/01 I I 1 W-201 Z~)/..- O~ ~ 21293 USIT I 06103/01 2 .. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: .. BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: RECEIVED · JUL I 3 2001 Almka0il&GasCons.~ Schlumberger DCS 3940 Arctic Blvd Suite 300 Anchorage AK 99503-5789 ATTN: Sherrie Receiv~~'~~,~~~ 14-Jun-01 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well W-201 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Surv'ey: Projected Survey: 0.00' MD 'MD 10,343.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED JUN ,1 g 2001 ~ Oil & Gas Cons. Com~ An(ha'age 14-Jun-01 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Definitive Survey Re: Distribution of Survey Data for Well W-201 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 'MD 10,343.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED JUN.'1 9 2001 Alaska 0il & Gas Cons. ~ Anchorage ALASKA 01L AND GAS CONSERVATION COM SSION May24,2001 7_0 ora( TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Gil Beuhler Central New Development Manager BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Subject: Application for Extension of Pilot Production Operations Well W-200; and Initial Production Operations at W-201, Prudhoe Bay Unit - Polaris Accumulation (Schrader Bluff Formation), ADL-28263, 047451, and 047452. File: Prudhoe Bay Field - Polaris Pool Dear Mr. Beuhler: The AOGCC has received an application from BP Exploration (Alaska) Inc. ("BP") to extend pilot production operations at the Polaris prospect, Prudhoe Bay Unit, at Well W-200 through August 31, 2001 and to initiate pilot production operations at Well W-201. The request is based on the need for additional information to evaluate primary development and establish a depletion plan. On February 22, 2001, BP provided additional information to Jack Hartz, AOGCC Sr. Reservoir Engineer, regarding primary' production and the anticipated pressure response during the extended production period. The AOGCC approved the original request for a waiver of the GOR limitations of 20 AAC 25.240 for production operations on W-200. The waiver of the GOR limitations is necessary to continue tract and production operations at W-200, and the initial tract and production operations at W-201. Prior production reporting and allocation procedures are still applicable. Production should be reported to the Polaris Undefined Pool, number 640160. Your commitment to gather pressure data and maintain reservoir pressure aboVe bubble point will ensure reservoir energy is not diminished unnecessarily. We anticipate you will .keep the Commission informed about any significant developments. Therefore the Commission approves an extension of the Gas-Oil ratio variance through the end of August 2001 for well W-200 and through February 28, 2002 for W-201, conditioned on reservoir pressure performance. AOGCC approval is coincident with any restrictions imposed by The Division of Oil & Gas on Tract or PA operations. PresSure data should be forwarded to the AOGCC after each survey, or pressure test. If there are any questions please contact Jack Hartz at 279-1433 ext. 232. Copy: Mark Myers, DOG D.E. Dickinson, DOR Oil & Gas Audit Sincerely, Cammy'Ta~r, Chair PbuPolarisPilotOperations-Renewal-WPad.doc ~KA OIL AND GAS CONSERVATION COMMISSION Allen Sherritt Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, Alaska 99519 / / / TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: ' Prudhoe Bay Unit W-201 BP Exploration (Alaska) Inc. Permit No: 201-051 Sur Loc: 4829' NSL, 1177' WEL, SEC. 21, T1 IN, R12E, UM Btmhole Loc. 3567' NSL, 2327' EWL, SEC. 14, T1 IN, R12E, UM Dear Mr. Sherritt: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by Contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Julie M. Heusser Commissioner BY ORDER OF THE COMMISSION DATED this ~..~T~ day of April, 2001 jjc/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. .,( STATE OF ALASKA .," ALASK ,iL AND GAS CONSERVATION COM,v. _,SION PERMIT TO DRILL 20 AAC 25.005 I [] Exploratory [] Stratigraphic Test ail DeveloPment Oil la. Type of work [] Ddll [] Redrill lb. Type of well [] Service [] Development Gas [] Single Zone [] Multiple Zone [] Re-Entry [] Deepen 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 80.5' Prudhoe Bay Field / Rolar-~ 3. Address 6. Property Designation -Pool" ~.-4,-~J~_.,,- z~/~:t'" P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047451 ~'~ ~,~/'c~,'-¢~¢./ 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 A~C 25.025) 4829' NSL, 1177' WEL, SEC. 21, T11N, R12E, UM , Prudhoe Bay Unit At top of productive interval 8. Well Number 2320' NSL, 2836' EWL, SEC. 15, T11N, R12E, UM W-201 Number 2S100302630-277 At total depth 9. Approximate spud date 3567' NSL, 2327' EWL, SEC. 14, T11N, R12E, UM 03/20/01 Amount $200,000.00 12. Distance to nearest property line ~13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028260, 1712' MDI 39.6' away from W-200 at 1400' MD 2560 12811' MD / 5403' TVD 16. TO be completed for deviated wells. 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 1083'MD Maximum Hole Angle 87° Maximum surface 1781 psig, At total depth (TVD) 5130'/2294 psig ,, 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stagedata) 30" 20" 91.5# H-40 Weld 80' Surface Surface 109' 109' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-M 2896' Surface Surface 2896' 2683' 414 sx AS III, 256 sx Class 'G' 8-3/4" 7" 26# L-80 BTC-M 7749' Surface Surface 7749' 5213' 460 sx Class 'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-Mod 4212' 7599' 5200' 11811' 5367' Uncemented Slotted Liner 6-1/8" 4-1/2" 12.6# L-80 IBT-Mod 1000' 11811' 5367' 12811' 5403' 109 sx Class'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production Liner RECEIVED 0 7 2001 Perforation depth: measured Alaska Oil & Gas Cons. Commission true vertical Anchorage 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Allen S~ferritt, 564-5204 Prepared By Name/Number: Terrie Bubble, 564-462'8 21. I hereby certify that the_foregC'ng is true and, Cbrrect to the best of my knowledge Signed Lowell Crane ~/ ~~,,,_~_...,.T~Io Senior Drilling Engineer Date Permit Number I APl Number I Cy,..~%~¢t~ I See cover letter :2__0 / - O ,S-'/ 50- ~ ~ ~ -- 2_.. ~ ~.)~ ~' for other requirements Conditions of Approval: Samples Required ~'Yes [] No Mud L~)~'~equ'1'red [] Yes ~[] No Hydrogen Sulfide Measures [] Yes [] No Directional Survey Required [] Yes [] No Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K ~3-.5K psi Other: OR,G,NALS,GNEDBY by order of Approved By ,J. ~. Heusser ...Commissioner the commission Date Form 10-401 Rev. 12-01-85 ORIGINAL Submit In Trit cate I Well Name: IW-201 RECEIVED r~/~R 0 ? 2001 Drill and Complete Plan Summary Alaska Oil & Gas Cons. Commission Anchorage I Type of Well (service ! producer/injector): I Producer I Surface Location: Target Location: Schrader Bluff "O" sands Bottom Hole Location: X = 612,048.9 Y = 5,959,806.1 450' FNL 1177' FEL S21 T11N R12E Umiat X = 616,015.00 Y = 5,962,638.00 2320' FSL 2442' FEL S15, T11N, R12E Umiat X = 620,763.00 Y = 5,963960.00 3567' FSL 2952' FEL S14, T11N, R12E Umiat I AFENumber: 15M1013 I I Estimated Start Date:13/20/2001 I I MD: 112,811' I I Rig: I Nabors7ES I Operating days to complete: 130.0 I TVD: 15,403' I I BF/MS: 152.4' I I RKB: 1~0.5' I Well Design (conventional, slimhole, etc.): I Ultra Slimhole Horizontal I Objective' I Schrader Bluff Formation (Target zones Obd sands) Mud Program: Surface Interval Mud Properties: Spud Mud Fluid 12 ~/~" hole Density Viscosity Yield Point tau0 APl FL PH (ppg) (seconds) (Ib/100ftz) (Ib/T~'(Jft2) (mls/30min) Initial 8.5 - 8.6 300 50 - 70 > 9 15 - 20 8.5 - 9.5 below -2000' MD 9.0 - 9.5* 100 - 200 30 - 45 > 7 < 10 8.5 - 9.5 interval TD 9.6 max. 100 25 - 35 > 6 < 10 8.5 - 9.5 Intermediate Interval Mud Properties: LSND Fluid ~2~'hole Density Plastic Yield Point tau0 10' Gel ~ (ppg) Viscosity (Ib/100ft~) (Ib/100ft2) (cp) Initial 10 10 - 15 18 - 25 3 - 7 10 - 18 8.5 - 9.5 Final 10.5 10 - 18 20 - 28 4 - 7 10 - 18 8.5 - 9.5 Production Interval Mud Properties: 6% KCI Baradril-n Fluid 6 1/8" hole Density Plastic Vis Yield Point MBT APl FL HTHP FL pH C/ (PPg) (cp) (lb/100ftz) (m Is/30 m in ) Initial 9.1 8-14 22-27 < 2.5 < 4-6 <10 8.5 - 9.5 27-32k **Keep drilled LGS <12ppb W-201 Permit to Drill Final Page I RECEIVED Directional: o Ver. Sperry WP-02 Draft '"~"" ~ ~uu ~ KOP: 1083' Alaska 0il & Gas Cons. Commission Maximum Hole Angle: 87° at 7749' MD Anchorage Close Approach Wells: W-200 = 39.6' center-center (10.7' allowable deviation from plan) to 1400' MD. All other wells are south of the W- 201 trajectory. Logging Program: Surface Intermediate Hole Production Hole Drilling: MWD / GR Open Hole: None Cased Hole: None Drilling: MWD / GR / Res Open Hole: None Cased Hole: USIT cement evaluation Drilling: MWD / GR / Res / PWD / with Neu / Den (recorded) Open Hole: None Cased Hole: None Formation Markers: Formation Tops MDbkb TVDss Estimated pore pressure, PPG Base Permafrost 2004 1900 8.8 SV3 2766 2520 8.8 SV2 3068 2700 8.8 SV1 3635 3025 8.8 UG4 4290 3400 8.8 UG4A 4377 3450 8.8 - 10.4 Top Ugnu Ma sand 6296 4550 8.9 Mb1 6375 4595 8.9 Mb2 6462 4645 8.7 Mc/WS2/Top 6567 4705 8.7 Schrader Bluff Na 6672 4765 8.7 Nb 6715 4790 8.7 Nc 6785 4830 8.7 Top OA sand / WS1 6948 4915 8.7 OBa 7069 4970 8.6 Obb 7156 5005 8.6 Obc 7272 5045 8.6 OBd 7489 5100 8.6 TD 12811 5320 8.60 Target Sand Obe Not Reached. Obf Not Reached. Obf Base Not Reached. W-201 Permit to Drill Final Page 2 RECEIVED MAR 0 7 Alaska Oil & Gas Cons. Commission Anchorage Casin /Tubing Proqram: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tb~l O.D. MD/TVD MD/TVD bkb 30" 20" 91.5# H-40 WLD 80' GL 109/109 12-1/4" 9-5/8" 40# L-80 BTC-M 2896' GL 2896'/2683' 8-3/4" 7" 26# L-80 BTC-M 7749' GL 7749'/5213' 61/8" 4 Y2" Slotted 12.6# L-80 IBT-Mod 4212' 7599'/5200' 11811'/5367' 61/8" 41/2" 12.6# L-80 IBT-Mod 1000' 11811 '/5367' 12811 '/5403' Tubing 3-1/2" 9.3# L-80 EU 8rd 7599' GL 7599'/5200' Cement Calculations: The following surface cement calculations are based upon a single stage job using a port collar as contingency if cement is not circulated to surface. Casino. Basis: Size 19-5/8" Surface Lead: Based on 2000' of annulus in the permafrost @ 175% excess and 231' of open hole from top of tail slurry to base permafrost @ 30% excess. Lead TOC' To surface ITotal Cement Volume: Tail: Based on 500' TVD open hole volume + 30% excess + 80' shoe track volume. Tail TOC: At -2231' MD (2173' TVDbkb). Lead 327 bbl/1838 f¢ / 414 sks of Dowell ARTICSET Lite 3 at 10.7 ppg and 4.44 cf/sk. Tail 54 bbl / 302 f¢ / 256 sks of Dowell Premium 'G' at 15.8 ppg and 1.18 cf/sk. Casin~. Size 17" Intermediate Longstring I Basis: Lead: Based on TOC 500' above top of Ugnu formation and 30% excess above top of Tail Lead TOC: 3789' MD, 3196' TVDbkb Tail: Based on TOC 1788' above top of 7" shoe and 30% excess + 80' shoe volume Tail TOC: 5961' MD, 4441' TVDbkb iTotalCementVolume: i Lead 171bbls/402f¢/144sksofDowellPremium,G, at11.51 ppg and 2.790f/sk. Tail 165 bbls / 367 f¢/316 sks of Dowell Premium 'G' at 15.8 ppg and 1.16 cf/sk. Casing Size 14 Y2" P&A 1000' tail. Basis: ILead: NA Tail: Based on TOC 11811' top of 4 1/2" liner and 30% excess + 80' shoe volume I Total Cement Volume: Tail 1 22 bbls / 126 ftc/109 sks of Dowell Premium 'G' at 15.8 I ppg and 1.16 cf/sk. W-201 Permit to Drill Final Page 3 Well Control: Surface hole will be drilled with diverter. The intermediate hole, well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon calculations below BOP equipment will be tested to 3500 psi Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Production Interval- . Maximum anticipated BHP: · Maximum surface pressure: 2294 psi @ 5130' TVDss - Schrader OBf Sands 1781 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: 3500 psi (required casing test for future frac) · Planned completion fluid: 8.6 ppg seawater / 6.8 ppg Diesel Drilling Hazards/Contingencies: (See also hazards identified following the Procedure Summary) HYDROGEN SULFIDE - H2S · Standard Operating Procedures for H2S precautions should be followed at all times. The highest level of H2S recently measured on W-pad in the last 12 months was on several of the wells @ 10 ppm in August 2000. · The closest wells to W-201 are W-200 and W-24. Both measured 10 ppm at the last test in Aug/Sept, 2000. · W-200 is the closest BHL to W-201, with a reading of 10 ppm, August 2000. DRILLING CLOSE APPROACH: The closest well to the W-201 planned trajectory is W-200. W-200 = 39.6' center- center (10.7' allowable deviation from plan) to 1400' MD. All other wells are south of the W-201 trajectory. All wells pass the major risk criteria. Surface gyros will be run as required to ensure adequate separation between wells. Disposal: No annular injection in this well. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for injection. Haul all Class I wastes to Pad 3 for disposal. W-201 Permit to Drill Final RECEIVED rvlAR 0 ? 2001 Alaska 0il & Gas Cons. Commission Anchorage Page 4 DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Rig Work: The 20" conductor is in p/ace. 1. Weld an FMC landing ring for the FMC Ultra slimhole wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. 3. Ensure any required plugs and / or well shut-ins have been accomplished in nearby wells for rig move and close approach concerns. Rig 1. 2. 3. Operations: MIRU Nabors 7ES. Nipple up and function test 16" diverter system. PU 4" DP as required and stand back in derrick. MU 12 ¼" drilling assembly and drill surface hole to +/-100' TVD below the SV3 sand top (30' below the sand base). 4. Run and cement the 9 5/8", 40# surface casing back to surface. A TAM port collar will be positioned at _+1000' as contingency in the event cement does no fully circulate to surface. 5. ND diverter spool and riser and NU casing / tubing head. NU BOPE and test to 3500 psi. 6. MU 8 3~,, drilling assembly and RIH to float collar. Test the 9 5/8" casing to 3500 psi for 30 minutes. 7. Drill out shoe joints and displace well to LSND drilling fluid. Drill new formation to 20' below 9-5/8" shoe and perform a FIT to 12.5 ppg EMW. 8. Drill per directional plan and land well base of target, Schrader OBd sand. Circulate and condition hole, POOH. 9. Run 7" 26#/ft long string casing to TD of intermediate section and cement to 500' MD above the Ugnu 4A formation, set on mandrel hanger. Displace cement with mud. Bump plug to 3500 psi, check floats. 10. Freeze protect 7" x 9-5/8" annulus with dead crude to 2000' TVD by bullheading down the surface X long-string annulus. 11. RU Schlumberger, run DPC USIT cement evaluation log from 7" landing collar to surface casing shoe. (The USIT log does not need to be run under pressure.) 12. MU 6 1/8" drilling assembly and RIH to float collar. Test the 7" casing to 3500 psi for 30 minutes. 13. Drill out shoe joints and displace well to 6% KCI Baradrilln drilling fluid. Drill new formation to 20' below 7" shoe and perform a FIT to 9.5 ppg EMW. 14. Drill per directional plan the lateral in the Schrader OBd sand to TD of -12,811' MD. Circulate and condition hole, displace lateral section with new Baradrilln liner running pill. POOH. 15. Run -1000' of 4 Y2" 12.6#/ft solid liner w/ECP followed by -4112' of 4 Y2" slotted liner, (with inner- string), to TD of lateral section and cement above the top of the 4 ¥2" solid liner. Displace cement with clean seawater. Bump plug to 3500 psi, check floats. Release inner-string from 4 Y2" liner. Circulate well to clean seawater. Set liner top hanger. POOH. 16. Run 3-1/2", 9.3# L-80 completion string leaving 50' between tubing tail and 4 Y2" liner top. 17. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. 18. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 19. Freeze protect the well to -2200' and secure the well. 20. Install BPV. Secure the well and rig down / move off 7ES. Estimated Spud Date: 3/20/2001 Allen Sherritt Alaska Drilling & Wells 564--5204 mailto:sherriia @ BP.com W-201 Permit to Drill Final RECEIVED 0 7 20 1 Alaska Oil & Gas Cons. Commission Anchorage Page 5 Job 1- MIRU Hazards and Contingencies > Well W-200 is located 35' south of planned well center and therefore does not require to be shit-in for moving the rig. Reference RPs 4° "Drilling/Workover Close Proximity Surface and Subsurface Wells Procedure" Operational Specifics Job 2: Drillinq Surface Hole Hazards and Contingencies > No faults are expected to be penetrated by W-201 in the surface interval. The SV1 sand may contain gas hydrates, however, only two wells have encountered thus far in the W-pad development. Hydrate will be treated at surface with appropriate mud products. W-Pad does not have a history of over-pressure in the SV3/Cretaceous intervals from Produced water injection. Reference RPs Operational Specifics Job 3: Install surface Casinq Hazards and Contingencies ~ It is critical that cement is circulated to surface for well integrity. 175% excess cement through the permafrost zone (and 30% excess below the permafrost) is planned. As a contingency, a 9-5/8" port collar will be positioned at ___1000'MD to allow a secondary circulation as required. Reference RPs Operational Specifics RECEIVED MAR 0 7 ZOO1 Alaska Oil & Gas Cons. Commission Anchorage Job 4: Drillinq Intermediate Hole Hazards and Contingencies ~ W-201 is not expected to penetrate any faults in either the reservoir or tangent sections. It is important that the planned well trajectory for W-201 be maintained in the Ugnu W-201 Permit to Drill Final Page 6 section of the well, as W-201 W.P. #1 passes 600' north of a small offset (<20') fault. W-201 also passes -700' north of the tip out of a second small offset fault (<20') in the Schrader Bluff OA Sand interval. The surface casing point is chosen just below the SV3 sands, leaving the SV1 exposed for the 8-3/4" hole. The intermediate TD is above the HRZ, (Schrader OBd), a lower mud weight will be require, thus minimizing the risk of differential sticking across the SV1. The kick tolerance for the 8 3A" open hole section would be 107 bbls assuming an influx from the Schrader interval at -7749' MD. This is a worst case scenario based on a 8.6 ppg pore pressure gradient, a fracture gradient of 12.5 ppg at the surface casing shoe, and 10.5 ppg mud in the hole. Rig will perform LOT after drilling 20ft of new formation. Reference RPs Operational Specifics Job 5: Loq.qin.cj Intermediate Cased Hole Hazards and Contingencies ~ No hazards specific to this well have been identified for this phase of the well construction. Reference RPs Operational Specifics Job 6: Install Lon.qstring Casin.q Hazards and Contingencies ~ The Ugnu 4A will have approximately 50' - 70' oil bearing interval. For this reason the 7" casing will be cemented to 500' above the Ugnu 4A sand (the uppermost significant hydrocarbon). After freeze protecting the 7" x 9-5/8" casing annulus with dead crude, the hydrostatic pressure alone will be less than the formation pressure. Ensure a double-barrier at the surface on the annulus exists until the cement has set up for at least 12 hours. Expect trapped annulus pressure after pumping the dead crude. Reference RPs W-201 Permit to Drill Final RECEIVED Alaska Oil & Gas Cons. Commi[sion Anchorage ~age 7 Operational Specifics Job 7: Drill Production Hole Hazards and Contingencies ~ Milne Point has seen differential sticking problems drilling the long, (+3000'), Schrader laterals. Maintain mud properties, Iow MBT and fluid loss, while drilling the production interval. Avoid leaving the drilling string stationary for extended periods of time. No planned fault crossings in the production interval. The kick tolerance for the 7" shoe would be an infinite influx (annular volume) assuming an influx at section TD of 12,811' MD. This is a worst case scenario based on a 8.6 ppg pore pressure, a minimum fracture gradient of 9.5 ppg at the 7" casing shoe, and 9.1 ppg mud in the hole. Rig will perform FIT to 9.5 ppg after drilling 20ft of new formation. Reference RPs Operational Specifics Job 9: Case & Cement Production Liner Hazards and Contingencies ~ Milne Point has seen differential sticking problems running the long slotted liners, (+3000'), in the Schrader laterals. Circulate new Baradrilln liner running pill prior to PO(DH. Run two straight blade centralizers per joint to help minimize differential sticking while running liner. Avoid leaving the liner stationary for extended periods of time. Reference RPs Operational Specifics Job 12: Run Completion Hazards and Contingencies :> No hazards specific to this well have been identified for this phase of the well construction. Reference RPs Operational Specifics W-201 Permit to Drill Final RECEIVED Alaska 0il & Gas Cons. Commission Anchorage Page 8 Job 13: ND/NU/Release Riq Hazards and Contingencies ~ No hazards specific to this well have been identified for this phase of the well construction. Reference RPs Operational Specifics W-201 Permit to Drill Final RECEIVED Alaska 0il & Gas Cons. Commission Anchorage Page 9 TREE -- 4" 5000 psi WELLHEAD= FMC 11" 'A (~'~6'R'-- i~'~i~'~" ~''''L-' 53.2 KOP = 1100' ~'A'n'gje"& .... 5~'"@' 7~'9" Datum MD = ................................................................................................... Datum ~D= I 9-5/8 " 40# m-BTC I [2896' MD ~ Minimum ID - 2.813" RECEIVED MAR 0 ? 2001 Alaska 0il & Gas Cons. Commission Anchorage I 'Eeback Receptacle I I7599' I 7" 26# m-BTC ] 1774~' MD I PERFORATION SUMMARY REF LOG: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE W-20t SAFETY NOTES 2100' 1 [ 3-1/2" x, 3.813" ID I GAS LIFT MANDRELS STA MD TVD DEV TYPE MAN LATCH 4 2500 3 3500 2 4400 1 4500 6181' MD] I 3-1/2"X, 2.813" ID I 6231' MD1 I 3-1/2" X, 2.813" ID I 6246' MD] I 3-1/2"WLEG I --------~7609' MD] I 7"x4.5" Hanger/PKR] 7686. M°l I x in 150' solid 4.5" I 7749' to 11811' MDI I 4-1/2 " Slotted Liner I PlugbackECP&tbg ] Well TD DATE REV BY COMMENTS 03/4/20011 JAS Original proposed completion PRUDHOE BAY UNIT / FOLARIS FIELD WELL: W-201 PERMIT No: APl No: Sec. 21, T11N, R12E, 1177' FEL, 450' FNL BP Exploration (Alaska) ~:~=~r~-su~.I NorthSiopeAlaska o.,--,.....v,=.. Alaska Drilling & Wells A Ha]lll~lton ~ PBU WOA W Pad W-201 WP02 I DrillQuest Current Well Properties Well: Horizontal Coordinates: Ref. Global Coordinates: Ref. Structure Reference: Ref. Geographical Coordinates: RKB Elevation: North Reference: Units: W-201 WPS 5959805.74 N, 612048.94 E 2579.46 N, 2172.24 E 70° 17'56.7641' N, 149° 05' 33.1853" W 83.201t above Mean Sea Level 83.20ft above Structure Reference True North Feet o I Proposal Data for W-201 Wp02 Vertical Origin: Well Horizontal Origin: Well Measurement Units: ff NoAh Reference: True North Dogleg severity' Degrees per 100 feet Vertical Section Azimuth' 65.366° Vertical Section Description: Well Vertical Section Origin .' 0.00 N,0.00 E Measured Incl. Azim. Vertical Northings Eastings Vertical Depth Depth Section 0.00 0.000 0.854 0.00 0.00 N 0.00 E 0.00 1083.20 0.000 0.854 1083.20 0.00 N 0.00 E 0.00 0.00 1233.20 1.500 54.350 1233.18 1.14 N 1.60 E 1.93 1.00 1383.20 4.500 54.350 1382.96 5.72 N 7.97 E 9.63 2.00 2004.04 23.125 54.350 1983.20 91.73 N 127.89 E 154.49 3.00 2104.04 23.125 54.350 2075.16 114.62 N 159.80 E 193.04 0.00 2878.93 54.121 54.350 2673.20 393.10 N 548.06 E 662.04 4.00 2978.93 54.121 54.350 2731.81 440.32 N 613.91 E 741.57 0.00 3016.57 55.035 51.815 2753.63 458.75 N 638.43 E 771.54 6.00 6756.83 55.035 51.815 4897.08 2353.62 N 3047.71 E 3751.38 0.00 7749.07 87.797 75.920 5213.20 2741.19 N 3881.76 E 4671.07 4.00 7879.16 87.797 75.920 5218.20 2772.81 N 4007.85 E 4798.86 0.00 7894.84 87.850 75.294 5218.80 2776.71 N 4023.03 E 4814.28 4.00 12811.24 87.850 75.294 5403.20 4023.87 N 8775.03 E 9653.64 0.00 1500 :~ 3000 O O ~ 4500 .-- DIr ~ 1.00*110~t : 10~.20ft MD, 10~a.2Olt TVD In OIr Rate ~ 2.lX)ell0Oft : 127,&20ft MD, 123a. 18ft TVD DIrRate~:l. 00e/t0eft :laaa.2OftMD, 1a82.gaft'rVD 9 ~8l 2895.99' MD DIr, Start Sail ~ 23.125': 2tX)4.04ItMD, I~&2OftTVD Begin Dlr ~ 4.00*il00ft : 2104.04ft MD, 2075.18ft 'rvD Dir, Start Sail ~ 64.121°: 2~T8.g3flMD,2675.20ftTVD Dir ~ &~X)elli~ft : 2~/~gaft MD, 2731.8tft TVD DIr, Start ~all ~ 65.0a5°: 3016.67flMD,275a.63ftl'VD Begin Dir ~ 4.00*tl0Oft : 6756.83ft MD, 4897.0~ft 1'VI) End Dir, Start Sail ~ 87.79i~': '/749.07ftMD,5213.20ftTVD Begin DIr~4.00*ll0~ft : 7879.16fl MD, 5218.20ft TVD End Dir, Start Sail ~ 87.860*: ?894.84flMD,621&~0ftTVO 0 Scale: linch = 1500ff I 1500 I 3000 7' Cas~g 5213.20' TVD w-Jo] we I 4500 6000 Vertical Section W-201 Wl~)2 I I 4 1/2= Liner 12811.24' MD 7500 9000 ~3.~ wp Section Azimuth: 65.366° (True North) S24&2e'TVD Depth 12~11.24ft MD,640~.20ft 'rvo PBU_WOA W Pad I DrillQuesf W-201 WP02 North Slope Alaska Alaska Drilling & Wells WeB T~get D~& for W-201 WP8 Nm'ia ~ ~ ASP¥ A~PX 5213.~0 51 ~0.~? ~.~;2~0.~ N6161~.~ E 5213 ~ 51~.~ ~o.~ ~ 6~.~ G ~21~.~ ~1~.~ ~.~ ~ 61~110.~ E 5213 ~ ~1~ ~ ~.~ ~ 6~.~ ~ 5213~ 51 ~.~ 5~ ~ N ~5 ~ z 5213.~ 51~ ~ 5~.~ ~ ~.~ E 5213 ~ 51~.~ ~5.~ ~ ~l~ ~ E 5213 ~ 51~ ~ 5~2~ ~ H 61~I0 ~ · 5213 ~ 51~.~ ~3~ ~ N 61~.~ E 5213 ~ 51~.~ ~ ~ 61~.~ ~ 5213 ~ 51~.~ 5~35~ ~ H ~ 3l ~ 5213 ~ 51~.~ 5~3~1.~ U ~1.55 ~ 5213 ~ ~1~.~ ~.~ ~l~l~l~i 4000 - 3000 - 2000 - 1000 - Vedlcal ~ ~: 0.00 N,0.00 E Proposal Data for W. Z01 Wp02 4 lr2' Liner 12811.24' MD 5403.20' TVD w-2#? w~, §215.20' End Dir, Start Sail ~ 87.880°: 7894.84flMD,5218.80ftTVD Begin Olr ~4.00'110~ft :7~fg. 16fl MD, 5218.20ft TVD End Dir, St;ut Sail ~ 87.797~': 77,Lg.07ftMD,621&20ftTVO Begin DIr~4.00ell00ft :6766.8aflMD, 489?.0~ftTVO 9 5/8" Casing 2895.99' MD DIr, Start Sail ~ ~.036°: 3015.87flMD,275&6~flTVO 2683.20' TVD In DIr ~ &OlPIltX)ft : 2978.93ft MD, 2/~J1.81fl TVD DIr, $tafl ~all ~ 64.1~°: 2~7~.~afIMD,~/~.20ftTVD Dir ~ 4.00'll00ft : 2104.04ft MD, 2070.16ft TVD DIr, Start Sail ~ 23.126°: 2004.04ftMD, I~3.20fITVD DIr Rate ~ $.01r'll0Oft : 13&~_.__~0ff MD, 13~2.~eft TVD Increase in DIr Rate ~ ~00"/10Oft : '1233.~0fl MD, 1233.1Blt 'I"VD 1.00'll00ft : 1083J0fl MD, 1083.~0ft TVI:) I 0 1000 2000 3000 Scale: linch = lO00ft Current Well Properties Well: Horizontal Coordinates: Ref. Global Coordinates: Ref. Structure Reference: Ref. Geographical Coordinates: RKB Elevation: North Reference: Units: W-201 WP02 5959805.74 N, 612048.94 E 2579.46 N, 2172.24 E 70° 17' 56.7641" N, 149° 05' 33.1853" W 83.20ft above Mean Sea Level 83.20ft above Structure Reference True North Feet 4000 5000 6000 7000 Eastings 8000 9000 Reference is True North Sper,/-Sun Drilling Se./ices Proposal Data - W-201 WPS - W-201 Wp02 MD Delta Inclin. Azimuth TVD Delta Northings Eastings Dogleg Toolface (ft) MD (fl) (°) (°) (fi) TVD (fi) (fl) (fi) (°/100fi) (o) 11 0.00 0.000 0.000 0.00 0.00 0.00 2' { 1083.20 1083.20 0.000 0.000 1083.20 1083.20. 0.00 0.00 0.000 0.0(X) · 3 1233.20 150.00 1.500~ 54.350 123~3~18 149:98 1.i4N 1.60E 1.000 541350 5'i 6 i 2104-041 100.00 23.125 54.350 2075.16 91.961 114.62Ni 159.80E 0.000 0.000 7' I 2878.93l 774.89 '54.121' 54.3501 2673.20 598.04 393.10'i .... , N! 548.06 E 4.000 0.000 8I 2978.93t 100.00 54.121. 54.3502731.81 58.61~ 440.32N.. 613.91E 0.000 0.000 9 3016.57 37.64 55,035 51;815 2753.63 21,82 458.75 N 638.43 E 10 6756,83 3740.26 55.035 51.815 4897.08 2143.45 2353.62N 3047.71 E 11T 7749.07 992.23 87.797 75.920 5213.20 316.12 2741.19 N 3881.76 E [' 12,~ 7879.161 !'30.091 87.7971 75!920t 5218.201, 5,00t 2772.elNI 4007.85EI 13 75.294 5218.80 0.60 2776.71:N 4023.03E 14T 75:294 5403.20 i84.40 4023.87 N 8775.03 E 6.000 293.141 0.000 0.000 4.000 39.720 o.ooo1 o.,oool 4.000 274.851 0.000 : 0.000 5 February, 2001 - 12:23 - 1 - DriilQuest North SIo. p.e Alaska Alaska Drilling & PBU WOA ~ w- o, ~P~~O~AL REPORT 5 February, 2001 Surface Coordinates: 5959805.74 N, 612048.94 E (70° 17' 56.7641" N, Kelly Bushing: 83.20ft above Mean Sea Level 149o05'33.1853"W) DRILLING SERVICES A Halliburton Company Proposal Ref: pro 10726 Sperry-Sun Drilling Services Proposal Report for W-201 WPS- W-201 Wp02 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) 0.00 0.000 0.000 -83.20 100.00 0.000 0.000 16.80 200.00 0.000 0.000 116.80 300.00 0.000 0.000 216.80 400.00 0.000 0.000 316.80 500.00 0.000 0.000 600.00 0.000 0.000 700.00 0.000 0.000 800.00 0.000 0.000 900.00 0.000 0.000 1000.00 0.000 0.000 1083.20 0.000 0.000 1100.00 0.168 54.350 1200.00 1.168 54.350 1233.20 1.500 54.350 1300.00 2.836 54.350 1383.20 4.500 54.350 1400.00 5.004 54.350 1500.00 8.004 54.350 1600.00 11.004 54.350 1700.00 14.004 54.350 1800.00 17.004 54.350 1900.00 20.004 54.350 2000.00 23.004 54.350 2004.04 23.125 54.350 Vertical Depth (ft) 0.00 100.00 200.00 416.80 500.00 516.80 600.00 616.80 700.00 _--_.~.°°~ __ 716.80 800.00 ~=_~ ~~ 816.80 900_.~ __-~ ~ N 91~ ~~_ ~ 0.00N 1000.~ li~i~.~ 0.00 N 1016.80 ~=~.00 0.01 N =~. 1116.79 ~ 1199.99 0.69 N 1149.98 1233.18 1.14 N Local Coordinates Northings (ft) 0.00 N 0.00 N 0.00 N 0.03 N 0,00 N __ --~ 0~ Global Coordinates Northings ~. Eastings (ft) _~_:_ ~ -~ (ft) Eastings (ft) __ 0.00 E 5~~_~N-~12048.94 E 0.00 E ..... 595~J~05.~ ~12048.94 E _ ~.00 ~~N ~12048.94 E -- /~~ ~ ~9 ~8~r~74 N 612048.94 E ~ 0.00~~980~4=_ N 612048.94 E ~~E 5959805.74 N 612048.94 E ~-~30 E 5959805.74 N 612048.94 E 0.00 E 5959805.74 N 612048.94 E 0.00 E 5959805.74 N 612048.94 E 0.00 E 5959805.74 N 612048.94 E 0.00 E 5959805.74 N 612048.94 E 0.00 E 5959805.74 N 612048.94 E 0.02 E 5959805.75 N 612048.96 E 0.97 E 5959806.45 N 612049.90 E 1.60 E 5959806.91 N 612050.52 E 1216.73 1299.93 2.62 N 1299.76 1382.96 5.72 N 3.65 E 5959808.41 N 612052.55 E 7.97 E 5959811.58 N 612056.83 E 1316.50 1399.70 6.53 N 1415.85 1499.05 13.13 N 1514.46 1597.66 22.75 N 1612.08 1695.28 35.37 N 1708.43 1791.63 50.95 N 1803.25 1886.45 69.44 N 1896.28 1979.48 90.81 N 1900.00 1983.20 91.73 N 9.10 E 5959812.41 N 612057.95 E 18.31 E 5959819.14 N 612067.05 E 31.72 E 5959828.96 N 612080.32 E 49.32 E 5959841.84 N 612097.72 E 71.03 E 5959857.74 N 612119.21 E 96.82 E 5959876.62 N 612144.71 E 126.60 E 5959898.42 N 612174.18 E 127.89 E 5959899.37 N 612175.45 E Dogleg Rate (°/lOOft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 2.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Alaska Drilling & Wells PBU_WOA W Pad Vertical Section Comment 0.00 o.0o o .o2 1.17 1.93 Begin Dir @ 1.00°/100ft · 1083.20ft MD, 1083.20ft TVD Increase in Dir Rate @ 2.00°/100ft · 1233.20ft MD, 1233.18ft TVD 4.41 9.63 11.00 22.12 38.32 Increase in Dir Rate @ 3.00°/100ft · 1383.20ft MD ~'~-~- 1382.96ft TVD 59.57 85.81 116.95 152.93 1 54.49 End Dir, Start Sail @ 23.125° · 2004.04ftMD,1983.20ftTVD Base Permafrost $ February, 2001 - 14:20 Page 2 of 13 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS- W-201 Wp02 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 2100.00 23.125 54.350 1988.25 2071.45 2104.04 23.125 54.350 1991.96 2075.16 2200.00 26.964 54.350 2078.88 2162.08 2300.00 30.964 54.350 2166.36 2249.56 2400.00 34.964 54.350 2250.24 2333.44 2500.00 38.964 54.350 2600.00 42.964 54.350 2700.00 46.964 54.350 2765.56 49.586 54.350 2878.93 54.121 54.350 2895.99 54.121 54.350 2900.00 54.121 54.350 2978.93 54.121 54.350 113.69 N 114.62 N 138.29 N 166.51 N 198.2=1 N ____ -- __ __ 2330.13 2413.33 ~~1 2405.62 2488.82 --.. ~_~.46~ _~ 2476.36 2559.56 -~_ 3~ ~ 2520.00 2603._2~__ ~~~ N 2542.01 ---~6~ ~ ~.59 N 2590.~ 21~.~ 393.10 N 2600.00 ~.20 401.16 N 2602.35 ~-~ 2685.55 403.05 N 2646.61 2731.81 440.32 N 3000.00 54.626 52.924 2660.88 2744.08 3016.57 55.035 51.81 5 2670.43 2753.63 3068.17 55.035 51.81 5 2700.00 2783.20 3100.00 55.035 51.81 5 2718.24 2801.44 3200.00 55.035 51.815 2775.55 2858.75 3300.00 55.035 51.815 2832.85 2916.05 3400.00 55.035 51.815 2890.16 2973.36 3500.00 55.035 51.81 5 2947.47 3030.67 3600.00 55.035 51.81 5 3004.78 3087.98 3635.29 55.035 51.81 5 3025.00 3108.20 3700.00 55.035 51.81 5 3062.08 3145.28 156.51 E 159.80 E _. _~959922.~ __. ~=. ~ ---- _____ 232.15~_-_--~997~9 N .276. -- 5 o0008.05 N ~-- '~1 E 5~.82 N 378.47 E 5~2.81 N ~5.~ E 5~124.~ N 475.~ E 5~153.~ N 497.16 E 5~169.70 N Global Coordinates Northings _.~ Eastings (ft) __~ ~ (ft) 5~N'~12205.74 E -~12207.02 E ..__ 612239.66 E 612278.68 E 612322.31 E 612370.53 E 612423.32 E 612480.11 E 612519.44 E 612540.73 E 548.06 E 5960206.97 N 612591.08 E 559.30 E 5960215.19 N 612602.19 E 561.94 E 5960217.12 N 612604.81 E 613.91 E 5960255.17 N 612656.21 E 450.48 N 627.70 E 5960265.53 N 612669.85 E 468.75 N 638.43 E 5960273.96 N 612680.45 E 484.89 N 671.66 E 5960300.59 N 612713.30 E 501.02 N 692.16 E 5960317.02 N 612733.56 E 551.68 N 756.68 E 5960368.64 N 612797.21 E 602.34 N 820.99 E 5960420.25 N 612860.86 E 653.00 N 885.41 E 5960471.87 N 612924.51 E 703.66 N 949.82 E 5960523.49 N 612988.17 E 754.32 N 1014.24 E 5960575.10 N 613051.82 E 772.20 N 1036.97 E 5960593.32 N 613074.28 E 804.98 N 1078.65 E 5960626.72 N 613115.47 E Dogleg Rate (°/lOOft) o.oo o,oo 4.00 4,00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0.00 0.00 0.00 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Alaska Drilling & Wells PBU_WOA W Pad Vertical Section Comment 191.48 193.04 232.90 280.43 333.82 392.83 457.17 526.52 574.55 600.55 662.04 675.61 678.80 741.57 758.34 771.54 812.65 838.00 917.67 997.34 1077.01 1156.68 1236.35 1264.46 1316.02 Begin Dir @ 4.00°/100ft · 2104.04ft M D, 2075.16ft TV SV3 End Dir, Start Sail @ 54.121° · 2878.93ftM D,2673.20ftTVD 9 5/8" Casing Begin Dir ~ 6.00°/100ft · 2978.93ft MD, 2731.81ft TVD End Dir, Start Sail @ 55.035° · 3016.57ftMD,2753.63ftTVD SV2 SVl DrillQ~est 2.00.06 5 February, 2001 - 14:20 Page 3 of 13 Sperry-Sun Drilling Services Proposal Report for W-201 WPS - W-201 Wp02 North Slope Alaska Measured Depth (ft) Incl. Azim. 3800.00 55.035 51.815 3900.00 55.035 51.815 4000.00 55.035 51.815 4100.00 55.035 51.815 4200.00 55.035 51.815 4289.65 55.035 51.815 4300.00 55.035 51.815 4376.90 55.035 51.815 4400.00 55.035 51.815 4500.00 55.035 51.815 4600.00 55.035 51.815 4700.00 55.035 51.815 4800.00 55.035 51.815 4900.00 55.035 51.815 5(X)0.00 55.035 51.81 5 5100.00 55.035 51.815 5200.00 55.035 51.815 5300.00 55.035 51.815 5400.00 55.035 51.815 5500.00 55.035 51.815 5600.00 55.035 51.815 5700.00 55.035 51.815 5800.00 55.035 51.815 5900.00 55.035 51.815 6000.00 55.035 51.815 6100.00 55.035 51.815 6200.00 55.035 51.815 6296.38 55.035 51.81 5 6300.00 55.035 51.815 6374.90 55.035 51.815 Sub-Sea Vertical Depth Depth (ft) (ft) Local Coordinates Northings Fastings (ft) (fi) 3119.39 3202.59 855.65 N 3176.70 3259.90 906.31 N 3234.01 3317.21 956.97 N 3291.31 3374.51 1007.63 N 3348.62 3431.82 1058.29 N 3400.00 3483.20 ~~ 3405.93 3489.13 ~r~ 3450.00 3533.20 _2 ~__=~_.91~ ~ 3463.24 3546.44 ~ 1-~61 ~ 3520.54 3603~.7:~__~ ~_~1~ N 35T'~- ~i~1~ ~1260.94 N 3749.77 ~2.97 1412.92 N 3807.08 '~ 3800.28 1463.58 N 1143.07 E 1207.48 E _ __~9~9.~ ~1 ~ 5[1~8~18 N ~1400,73~_ --_:~~ N ~ 5960931,08 N Y465714 E 5960936,42 N 1514,68 E 5960976,11 N 1529.56 E 5960988,03 N 1593.97 E 5961039.65 N Global Coordinates Northings ~ Fastings (ft) (.) 5~__:.N-~1~ 3179,12 E ~13242,78 E ~13306,43 E 613370.08 E 613433.73 E 613490.80 E 61 3497.39 E 613546.34 E 613561.04 E 613624.69 E 1658.39 E 5961091.26 N 613688.34 E 1722.80 E 5961142.88 N 613752.00 E 1787.22 E 5961194.50 N 613815.65 E 1851.63 E 5961246.11 N 613879.30 E 1916.05 E 5961297.73 N 613942.95 E 1980.46 E 5961349.35 N 614006.61 E 2044.68 E 5961400.96 N 614070.26 E 2109.29 E 5961452.58 N 614133.91 E 2173.71 E 5961504.19 N 614197.56 E 2238.12 E 5961555.81 N 614261.21 E 3864.39 3947.59 1514.24 N 3921.70 4004.90 1564.91 N 3979.00 4062.20 1615.57 N 4036.31 4119.51 1666.23 N 4093.62 4176.82 1716.89 N 4150.92 4234.12 1767.55 N 4208.23 4291.43 1818.21 N 4265.54 4348.74 1868.87 N 4322.85 4406.05 1919.53 N 4380.15 4463.35 1970.20 N 2302.54 E 5961607.43 N 614324.87 E 2366.95 E 5961659.04 N 614388.52 E 2431.37 E 5961710.66 N 614452.17 E 2495.78 E 5961762.27 N 614515.82 E 2560.20 E 5961813.89 N 614579.48 E 4437.46 4520.66 2020.86 N 4494.77 4577.97 2071.52 N 4550.00 4633.20 2120.35 N 4552.08 4635.28 2122.18 N 4595.00 4678.20 2160.13 N 2624.61 E 5961865.51 N 614843.13 E 2689.03 E 5961917.12 N 614706.78 E 2751.11 E 5961966.87 N 614768.13 E 2753.44 E 5961968.74 N 614770.43 E 2801.69 E 5962007.40 N 61 4818.11 E Alaska Drilling & Wells PBU_WOA W Pad Dogleg Vertical Rate Secllon Comment (°/lOOft) 0.00 1395.69 0.00 1475.36 0.00 1555.03 0.00 1634.70 0.00 1714.37 0.00 1785.79 UG4 0.00 1794.04 0.00 1855.30 UG4A 0.00 1873.70 0.00 1953.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2112.71 2192.38 2272.05 2351.72 2670.~ 27~.07 2820.74 2~.~ 2080.07 ~.74 3228.08 3307.75 3384.54 3387.42 3447.09 Top Ma Sands Mb1 $ February, 2001 - 14:20 Page 4 of 13 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS - W-201 Wp02 North Slope Alaska Measured Depth (ft) Sub-Sea Vertical Depth Depth (ft) (fi) 6400.00 55.035 51.815 4609.38 4692.58 6462.15 55.035 51.815 4645.00 4728.20 6500.00 55.035 51.815 4666.69 4749.89 6566.85 55.035 51.81 5 4705.00 4788.20 6600.00 55.035 51.815 4724.00 4807.20 6671.55 55.035 51.815 6700.00 55.035 51.815 6715.17 55.035 51.81 5 6756.83 55.035 51.815 6785.28 55.914 52.693 6800.00 56.370 53.141 6900.00 59.515 56.059 6947.85 61.041 57.388 7000.00 62.720 58.793 7069.00 64.961 60.587 4765.00 4848.20 4781.31 4864.51 4790.00 4873.20 4813.88 4897.08 4838,~_ 4_~_~.~ 4891.2~ ~.48 4915.00 ~8.20 4939.58 ? 5022.78 4970.00 5053.20 7100.00 65.975 61.372 4982.87 5066.07 71 56.41 67.830 62.769 5005.00 5088.20 7200.00 69.272 63.823 5020.94 5104.14 7271.96 71.665 65.520 5045.00 5128.20 7300.00 72.601 66.169 5053.60 5136.80 7400.00 75.957 68.430 5080.70 5163.90 7488.89 78.957 70.385 5100.00 5183.20 7500.00 79.3.33 70.626 5102.09 5185.29 7600.00 82.725 72.774 5117.69 5200.89 7700.00 86.126 74.889 5127.40 5210.60 7749.07 87.797 75.920 5130.00 5213.20 7800.00 87.797 75.920 5131.96 5215.16 Local Coordinates Northings Eastings (ft) (ft) 2172.84 N 2204.33 N 2223.50 N 2257.37 N 2274.16 N __ ~.51~ ~ -~3~2 ~ ~7.97 N ....... 2375.33 N 3076.00 E 2424.39 N 3145.08 E 2447.18 N 3179.82 E 2471.49 N 3218.86 E 2502.73 N 3272.33 E 2817.86 E 2857.89 E _~ ~_52.~ ~~_ ~2~__48 N ~2946.69~~-~6212~.~9 N ~~ 5962160.52 N 301W?10 E 5962175.20 N 3020.87 E 5962183.03 N 3047.71 E 5962204.54 N Global Coordinates Northings ~ Eastings (ft) ~ ~ (ft) 5~N ~S14634.09 E ~14873.65 E ~14897.74 E 614940.29 E 614961.39 E 615006.93 E 61 5025.04 E 615034.70 E 615061.22 E 3066.25 E 5962219.16 N 615079.54 E 5962226.68 N 615089.18 E 5962276.75 N 615157.52 E 5962300.08 N 615191.92 E 5962324.95 N 615230.60 E 5962356.98 N 615283.59 E 5962371.03 N 615308.04 E 5962396.01 N 615353.52 E 5962414.78 N 615389.49 E 5962444.69 N 615450.34 E 5962455.98 N 615474.53 E 2516.41 N 3296.99 E 2540.71 N 3342.83 E 2558.94 N 3379.08 E 2587.94 N 3440.37 E 2598.86 N 3464.72 E 2635.99 N 3553.51 E 5962494.42 N 615562.75 E 2666.49 N 3634.72 E 5962526.13 N 615643.50 E 2670.14 N 3645.01 E 5962529.93 N 615653.73 E 2701.14 N 3738.78 E 5962562.32 N 615747.02 E 2728.84 N 3834.35 E 5962591.45 N 615842.17 E 2741.19 N 3881.76 E 5962604.50 N 615889.40 E 2753.57 N 3931.13 E 5962617.62 N 615938.57 E Alaska Drilling & Wells PBU_WOA W Pad Dogleg Vertical Rate Section Comment (°/100ft) 0.00 3467.09 0.00 3516.60 Mb2 0.00 3546.76 0.00 3800.02 Mc 0.00 3826.43 0.00 0.00 0.00 0.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0.00 3683.43 3706.10 3718.18 3751.38 3774.20 Na Nb Begin Dir @ 4.00°/100ft · 6756.83ft MD, 4897.08ft TVD Nc 3786.14 3869.38 3910.46 OA 3956.08 4017.70 OBa 4045.82 o -'~ O 4097.62 OBb 4138.16 4205.97 OBc 4232.66 4328.84 4415,37 top OBd Sands 4426,24 4524,40 4622.82 4671.07 4721.10 End Dir, Start Sail @ 87.797° : 7749.07ftMD,5213.20ftTVD 7" Casing Target - TO 7" Casing Point, Current Target 5 February, 2001 - 14:20 Page 5 of 13 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS- W-201 Wp02 North Slope Alaska Measured Sub-Sea Depth Incl. Azim. Depth (ft) (ft) 7879.16 87.797 75.920 5135.00 7894.84 87.850 75.294 7900.00 87.850 75.294 8000.00 87.850 75.294 8100.00 87.850 75.294 8200.00 87.850 75.294 8300.00 87.850 75.294 8400.00 87.850 75.294 8500.00 87.850 75.294 8600.00 87.850 75.294 8678.79 87.850 75.294 8700.00 87.850 75.294 8800.00 87.850 75.294 8900.00 87.850 75.294 9(XX).00 87.850 75.294 9100.00 87.850 75.294 9200.00 87.850 75.294 9300.00 87.850 75.294 9400.00 87.850 75.294 9500.00 87.850 75.294 9600.00 87.850 75.294 9700.00 87.850 75.294 9800.00 87.850 75.294 9900.00 87.850 75.294 10000.00 87.850 75.294 10100.00 87.850 75.294 10200.00 87.850 75.294 10300.00 87.850 75.294 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings ~ Eastings (ft) (ft) (fi) (ft) ..... ~ (ft) 5218.20 2772.81 N 4007.85 E 5962638J~-~_-_ ~16015.00 E 52 8.8o 5135.79 5218.99 2778.0._1 N ~8.~ -~5962643.50 N 616035.09 E 5139.54 5222.74 f~l~_~ ~7 E 5962670.31 N 616131.36 E 5143.29 5226.49 ~.7~ ~ 4221.33 E 5962697.12 N 616227.62 E 5147.04 5230.24 ~-°~2 ~ 4317.99 E 5962723.92 N 616323.89 E 5150.79 5233.9~ ~ ~7~ N 4414.64 E 5962750.73 N 616420.16 E 5154.54_~~ ~_-_.~4.85 N 4511.30 E 5962777.53 N 616516.43 E 5158.~ 5~ .~ 2930.22 N 4607.96 E 5962804.34 N 616612.69 E 5162.0~ 5~.24~ 2955.59 N 4704.61 E 5962631.15 N 616708.96 E 5165.00 ~48.20 2975.57 N 4750.77 E 5962852.27 N 616784.81 E 5165.80 ~ 5249.00 2980.95 N 4801.27 E 5962857.95 N 616805.23 E 5169.55 5252.75 3006.32 N 4897.92 E 5962884.76 N 616901.49 E 5173.30 5256.50 3031.69 N 4994.56 E 5962911.56 N 616997.76 E 5177.05 5260.25 3057.06 N 5091 2.4 E 5962938.37 N 617094.03 E 5180.80 5264.00 3082.42 N 5187.89 E 5962965.17 N 617190.30 E 5164.55 5267.75 3107.79 N 5264.55 E 5982991.98 N 617286.56 E 5188.30 5271.50 3133.16 N 5381.21 E 5963018.79 N 617382.63 E 5192.05 5275.25 3158.53 N 5477.86 E 5963045.59 N 617479.10 E 5195.80 5279.00 3183.89 N 5574.52 E 5963072.40 N 617575.36 E 5199.55 5282.75 3209.26 N 5671.17 E 5963099.20 N 617671.63 E 5203.30 5286.50 3234.63 N 5767.63 E 5963126.01 N 617767.90 E 5207.05 5290.25 3259.99 N 5864.49 E 5963152.81 N 617864.17 E 5210.81 5294.01 3285.36 N 5961.14 E 5963179.62 N 617960.43 E 5214.56 5297.76 3310.73 N 6057.80 E 5963208.43 N 618056.70 E 5218.31 5301.51 3336.10 N 6154.46 E 5963233.23 N 618152.97 E 5222.08 5305.26 3361.46 N 6251.11 E 5963260.04 N 618249.24 E 5225.81 5309.01 3386.83 N 6347.77 E 5963286.84 N 616345.50 E Dogleg Rate (°/10Oft) 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Alaska Drilling & Wells PBU_WOA W Pad Vertical Section Comment 4798.86 4814.28 4819.36 Begin Dir @ 4.00°/100ft : 7879.16ft MD, 5218.20ft TVD Target - W-201 Wp 01 T1, End Dir, Start Sail @ 87.850~ : 7894.84ftMD,5218.80ffTVD 4917.79 5016.23 5114.66 5213.09 5311.53 5409.96 5508.39 5585.95 Obe 5606.82 5705.26 5803.69 5902.12 6000.56 6098.99 6197.42 6295.86 6394.29 6492.72 6591.15 6689.59 6788.02 6886.45 6984.89 7O83.32 7181.75 5 February, 2001 - 14:20 Page 6 of 13 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS- W-201 Wp02 North Slope Alaska Measured Depth (fi) 10400.00 87.850 75.294 10500.00 87.850 75.294 10600.00 87.850 75.294 10700.00 87.850 75.294 10800.00 87.850 75.294 10900.00 87.850 75.294 11000.00 87.850 75.294 11100.00 87.850 75.294 11200.00 87.850 75.294 11300.00 87.850 75.294 11400.00 87.850 75.294 11500.00 87.850 75.294 11600.00 87.850 75.294 11700.00 87.850 75.294 11800.00 87.850 75.294 11900.00 87.850 75.294 12000.00 87.850 75.294 12100.00 87.850 75.294 12200.00 87.850 75.294 12300.00 87.850 75.294 12400.00 87.850 75.294 12500.00 87.850 75.294 12600.00 87.850 75.294 12700.00 87.850 75.294 12800.00 87.850 75.294 12811.24 87.850 75.294 Sub-Sea Vertical Depth Depth (ft) (ft) Local Coordinates Northings Eastings (fi) (ft) 5229.56 5312.76 3412.20 N 5233.31 5316.51 3437.57 N 5237.06 5320.26 3462.93N 5240.81 5324.01 3488.30N 5244.56 5327.76 3513.67N N 6541.08 E ._-~__96~140.~ ~~ ~_07N ~6831.05~~4~7 N ~'~;~ 5963447.68 N ~ E 5963474.48 N 7121.02 E 5963501.29 N 7217.67 E 5963528.10 N 7314.33 E 5963554.90 N 5248.31 5331.51 5252.06 5335.26 5255.81 5339.01 5259.57 5342.77 . ~~~4 5263.32 5346_=.~ ~~ 526~ ~~ ~--3665.87 5270.~ ~.~= 3691.24 5274.5~ ~.77-~ 3716.61 5278.32=~1-- ~ .52 3741 5282.07 ~ 5365.27 3767.34 Global Coordinates Northings ~ Eastings 5~.N ~18441.77 E ~_~18538.04 E -~18634.30 E 618730.57 E 616826.84 E 618923.11 E 619019.37 E 619115.64 E 619211.91 E 619308.18 E N 7410.99 E 5963581.71 N 619494.44 E N 7507.64 E 5963608.51 N 619500.71 E N 7604.30 E 5963635.32 N 619596.98 E N 7700.95 E 5963662.12 N 619693.24 E N 7797.61 E 5963688.93 N 619789.51 E 5285.82 5389.02 3792.71 N 7894.27 E 5963715.74 N 619885.78 E 5289.57 5372.77 3818.08 N 7990.92 E 5963742.54 N 619982.05 E 5293.32 5376.52 3843.45 N 8087.58 E 5963769.35 N 620078.31 E 5297.07 5380.27 3868.81 N 8184.24 E 5963796.15 N 620174.58 E 5300.82 5384.02 3894.18 N 8280.89 E 5963822.96 N 620270.85 E 5304.58 5387.78 3919.55 N 6377.55 E 5963849.77 N 620367.11 E 5308.33 5391.53 3944.91 N 6474.20 E 5963876.57 N 620463.38 E 5312.08 5395.28 3970.28 N 8570.86 E 5963903.38 N 620559.65 E 5315.83 5399.03 3995.65 N 8667.52 E 5963930.18 N 620655.92 E 5319.58 5402.78 4021.02 N 8764.17 E 5963956.99 N 620752.18 E 5320.00 5403.20 4023.87 N 8775.03E 5983960.00 N 620763.00E Alaska Drilling & Wells PBU_WOA W Pad Dogleg Vertical Rate Section Comment (o~looft) 0.00 7280.19 0.00 7378.62 0.00 7477.05 0.00 7575.48 0.00 7673.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7772.35 7870.78 7959.22 8067.65 8166.08 8264.52 8362.95 8461.38 8559.81 8658.25 8756.68 8855.11 8953.55 9051.98 9150.41 9248.85 9347.28 9445.71 9544.15 9842.58 Total Depth: 12811.24tiM D,5403.20ftTVD 4 1/2" Liner Target - W-201 Wp 01 T2, Geological 5 February, 2001 - 14:20 Page 7 of 13 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS- W-201 Wp02 North Slope Alaska Alaska Drilling & Wells PBU_WOA W Pad All data is in feet unless olherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.949° (29-Jan-01) The Dogleg Severity is in Degrees per 100 feet. ~_~_ Vertical Section is from Well and calculated along an Azimuth of 65.366° ~__e). __ Based upon Minimum Curvature type calculations, at a Measur~~ of 1~., The Bottom Hole Displacement is 9653.64ft., in the Direction o~~(True). Comments -=%~ Measured Station Coord~ates Depth TVD Nor~hings Eastings Comment (ft) (ft) (tt) 1083.20 1083.20 0.00 N 0.00 E 1233.20 1233.18 1.14 N 1.60 E 1383.20 1382.96 5.72 N 7.97 E 2004.00 1983.20 91.73 N 127.89 E 2100.00 2075.16 114.62 N 159.80 E Begin Dir @ 1.00°/10Oft : 1083.20ffMD, 1083.20ftTVD Increase in Dir Rate @ 2.00°/103ft : 1233.20ft MD, 1233.18ft TVD Increase in Dir Rate @ 3.00°/100ft : 1383.20ft MD, 1382.96fl TVD End Dir, Start Sail @ 23.125°: 2004.04ftMD,1983.20ftTVD Begin Dir @ 4.00°/10Oft : 2104.00ft MD, 2075.16ft TVD 2878.93 2673.20 393.10 N 548.06 E 2978.93 2731.81 440.32 N 613.91 E 3016.57 2753.63 458.75 N 638.43 E 6756.83 4897.08 2353.62 N 3047.71 E 7749.07 521320 2741.1 9 N 3881.76 E End Dir, Start Sail @ 54.121°: 2878.93ftMD,2673.20ftTVD Begin Dir @ 6.00°/100ft : 2978.93ft MD, 2731.81ft 'I'VD End Dir, Start Sail @ 55.035°: 3016.57ftMD,2753.63ftTVD Begin Dir @ 4.00°/100ft : 6756.83ft MD, 4897.08ft TVD End Dir, Start Sail @ 87.797°: 7749.07ftMD,5213.20ftTVD o (-') ~ ~ $ February, 2001 - 14:20 Page 8 of 13 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS- W-201 Wp02 North Slope Alaska Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comments (Continued) 7879.16 5218.20 7894.84 5218.80 12811.24 54O3.20 2772.81 N 4007.85 E 2776.71 N 4023.03 E 4023.87 N 8775.03 E Formation Tops Measured Vertical Depth Depth (ft) (ft) Comment ~--- ~ -- Begin Dir @ ~°/1~: 787g..16ft MD, 5218.20ff TVD ~En~Start ~ ~ ° ~ ~ - 7894.84flMD,5218.80ftTVD ~' 128~D,5403.20ftTVD Depth North_ __ s ~ Eastings Dip Dip Dir. Formation Name (ft) (ft)~ (ft) Deg. Deg. 2004.04 1983.20 1900.00 91.73 N 127.89 E 0.000 0.854 Base Permafrost 2765.56 2603.20 2520.00 341.15 N 475.64 E 0.000 0.854 SV3 3068.17 2783.20 2700.00 484.89 N 671.66 E 0.000 0.854 SV2 3635.29 3108.20 3025.00 772.20 N 1036.97 E 0.000 0.854 SVl 4289.65 3483.20 34(X).00 1103.71 N 1458.48 E 0.000 0.854 UG4 4376.90 3533.20 3450.00 1147.91 N 1514.68 E 0.000 0.854 UG4A 6296.38 4633.20 4550.00 2120.35 N 2751.11 E 0.000 0.854 Top Ma Sands 6374.90 4678.20 4595.00 2160.13 N 2801.69 E 0.000 0.854 Mb1 6462.15 4728.20 4645.03 2204.33 N 2857.89 E 0.000 0.854 Mb2 6566.85 4768.20 4705.00 2257.37 N 2925.33 E 0.000 0.854 Mc 6671.55 4848.20 4765.00 2310.41 N 2992.77 E 0.000 0.854 Na 6715.17 4873.20 4790.00 2332.51 N 3020.87 E 0.000 0.854 Nb 6785.28 4913.20 4830.00 2367.97 N 3066.25 E 0.000 0.854 Nc 6947.85 4998.20 4915.00 2447.18 N 3179.82 E 0.000 0.854 OA 7069.00 5053.20 4970.00 2502.73 N 3272.33 E 0.000 0.854 OBa Alaska Drilling & Wells PBU_WOA W Pad 5 February, 2001 - 14:20 Page 9 of 13 DrillQuest 2.00,06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS- W-201 Wp02 North Slope Alaska Measured Vertical Sub-Sea Depth Depth Depth Northings (ft) (ft) (fi) (ft) Formation Tops (Continued) Eastings Dip Dip Dir. Formation Name (ft) Deg. Deg. Alaska Drilling & Wells PBU_WOA W Pad 7156.41 5088.20 5005.00 2540.71 N 3342.83 E 7271.96 5128.20 5045.00 2587.94 N 3440.37 .~ =~ii~ii¥.,.O.O00 ...'~i .... ~!~.~ii!~ .... 7488.89 5183.20 5100.00 2666.49 N 3634.7~.~i~,.. 8678.79 5248.20 5165.00 2975.57 N 4780.~i~ '~ ~00 Casing deMils ~r'~}}~, Measured Vertical Measured ve~ Depth Depth Depth De~i~ Casing Detail (ft) (ti) (ft) (~t) <Surface> <Surface> 2895.99 2683.20 9 5/8" Casing <Surface> <Surface> 7749.07 5213.20 7" Casing <Surface> <Surface> 12811.24 5403.20 4 1/2" Liner 0.854 OBc top OBd Sands Obe 5 February, 2001 - 14:20 Page 10 of 13 DrillQuest 2,00.06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS - W-201 Wp02 North Slope Alaska Alaska Drilling & Wells PBU_WOA W Pad Targets associated with this wellpath Target Name T~-g ~ E~ y Coordinates ~_'r~ _ ~ ~hings Eastings ~ ~ ~13.20 Mean Sea~__[~ ~ 5130.00 _._=~---_~ __~ Point #1 5213.20 #2 521320 #3 5213.20 #4 5213.20 #5 5213.20 ~6 5213.20 #7 5213.20 #8 5213.20 #9 5213.20 #10 5213.20 #11 5213.20 #12 5213.20 #13 5213.20 #14 5213.20 (ft) (ft) 2772.81 N 4007.85 E 5962638.00 N 616015.00 E 70° 18' 24.0262" N 149° 03' 36.2967' W 2473.13 N 4118.39 E 3071.49 N 3897.29 E 3230.21 N 4319.70 E 3556.01 N 5274.67 E 3881.51 N 6249.63 E 4178.50 N 7124.16 E 4494.75 N 8048.97 E 4666.52 N 8601.60 E 3381.22 N 8947.47 E 3318.76 N 8441.48 E 3123.10 N 7478.46 E 2942.29 N 6525.66 E 2757.29 N 5517.79 E 2565.96 N 4600.13 E Mean Sea Level/Global Coorcrmates #1 5130.00 · 2 5130.00 #3 5130.00 #4 5130.00 #5 5130.00 #6 5130.00 #7 5130.00 #8 5130.00 ~9 5130.00 #10 5130.00 #11 5130.00 #12 5130.00 #13 5130.00 #14 5130.00 5962340.00 N 616130.00 E 5962935.00 N 615900.00 E 5963100.00 N 616320.00 E 5963440.00 N 617270.00 E 5963780.00 N 618240.00 E 5964090.00 N 619110.00 E 5964420.00 N 620030.00 E 5964600.00 N 620580.00 E 5963320.00 N 620945.00 E 5963250.00 N 620440.00 E 5963040.00 N 619460.00 E 5962845.00 N 618530.00 E 5962645.00 N 617525.00 E 5962460.00 N 616610.00 E Target Target Shape Type Polygon Drillers 5 February, 2001- 14:20 Page 11 of 13 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS- W-201 Wp02 North Slope Alaska Target Name Targets associated with this wellpath (Continued) Target Entry Coordinates 'rVD ~rthings Eastings (ft) ~ ~ (ft) (ft) Geographical~es#1~~ ~ 70°18'21.0780"N 149°03'33.0775'W ~ tl~ ~? 70° 18' 26.9645" N 149° 03' 39.5166' W .... ~ ~_ ~--_~_ ~ 70° 18' 28.5234" N 149° 03' 27.1939' W ~-~--~ -~-#4 70° 18' 31.721 6" N 149° 02' 59.3341 ' W ~ _. #5 70° 18' 34.9160" N 149° 02' 30.8886' W '~ ~6 70° 18' 37.8295' N 149° 02' 05.3712" W #7 70° 18' 40.9308' N 149° 01' 38.3841" W #8 70° 18' 42.6143' N 149° 01' 22.2575' W ~J 70° 18' 29.9685' N 149° 01' 12.2123' W #10 70° 18' 29.3599' N 149° 01' 26.9726' W #11 70° 18' 27.4454' N 149° 01' 55.0668' W #12 70° 18' 25.6758" N 149° 02' 22.8610" W #13 70° 18' 23.8642" N 149° 02' 52.2600' W #14 70° 18' 22.1850" N 149° 03' 19.0263' W TO 7' Casing Point W-201 Drillers Poly @ 95% Mean Sea Level/Global C(x)r(~ates: Geographical Coordinates: Mean Sea Level/Global Coordinates: Geographical Coorcrmates: Target Boundary Point #1 #4 #5 #7 #8 #9 #10 #11 #12 5213.20 2741.1 9 N 3881.76 E 5130.00 5962604.50 N 615889.40 E 70° 18' 23.7158" N 149° 03' 39.9745" W 5213.20 3000.27 N 4889.69 E 5130.00 5962878.59 N 616893.36 E 70° 18' 26.2584" N 149° 03' 10.5735" W 5213.20 3198.02 N 4729.87 E 5213.20 3198.02 N 4729.87 E 5213.20 3301.30 N 4966.90 E 5213.20 4240.29 N 7740.02 E 5213.20 4298.27 N 7982.64 E 5213.20 4298.27 N 7982.64 E 5213.20 3600.85 N 8284.98 E 5213.20 3506.39 N 8306.98 E 5213.20 3412.91 N 8234.41 E 5213.20 3412.91 N 8234.41 E 5213.20 2802.63 N 5125.54 E 5213.20 2778.85 N 4873.43 E Alaska Drilling & Wells PBU_WOA W Pad Target Target Shape Type Point Current Target Polygon Current Targ~ 5 February, 2001 - 14:20 Page 12 of 13 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for W-201 WPS- W-201 Wp02 North Slope Alaska Target Name Targets associated with this wellpath (Continued) W-201 Wp 01 T1 W-201 Wp 01 T2 Mean Sea Level/Global ~nat~s #1~-~.~ ~- ~ '~ 30.00 _~.__~ ~ ~- _~ 513o.oo ~ ~ ~ "~-~-#4 5130.00 ~--~ #5 5130.00 ....... #7 5130.00 --~-- ---- .... ~ ~ #8 5130.00 ~ #9 5130.00 -~ ~ ~-~_ #10 5130.00 ~_ .... _~--- ~ #11 5130.00 ~_ #12 5130.00 Geographical Coordinates #1 #2 #3 #4 ~ #5 #10 #11 #12 5218.2.0 540~.20 Moan Sea I..ev~/Global Coordinates: 5320.00 Target Entry Coordinates TVD ._._Northings Eastings (ft) ~_ ~ (fi) (ft) 5963073.93 N 616730.60 E 5963073.93 N 616730.60 E 5963180.73 N 616966.06 E 5964160.97 N 619724.87 E 5964222.56 N 619966.60 E 5964222.56 N 619966.60 E 5963529.72 N 620279.31 E 5963435.60 N 620302.69 E 5963341.05 N 620231.55 E 5963341.05 N 620231.55 E 5962684.48 N 617132.12 E 5962656.95 N 616880.39 E 70° 18' 28.2043" N 149° 03' 15.2313" W 70° 18' 28.2048" N 149° 03' 15.2313' W 70° 18' 29.2186" N 149° 03' 08.3161' W 70° 18' 38.4813" N 149° 01' 47.4045" W 70° 18' 38.9990" N 149° 01' 40.3253" W 70° 18' 38.9990" N 149° 01' 40.3253' W 70° 18' 32.1361" N 149° 01' 31,5282" W 70° 18' 31,2068" N 149° 01' 30.8903" W 70° 18' 30.2882" N 149° 01' 33.0092" W 70° 18' 30.2882" N 149° 01' 33.0092" W 70° 18' 24.3128" N 149° 03' 03.6989' W 70° 18' 24.0806" N 149° 03' 11.0522" W 2772.81 N 4007.85 E 5962638.00 N 616015.00 E 70° 18' 24.0262" N 149° 03' 36.2987" W 4023.87 N 8775.03 E 5963960.00 N 620763.00 E 70° 18'36.2913" N 149° 01' 17,2199"W Alaska Drilling & Wells PBU_WOA W Pad Target Target Shape Type Point Geological Point Geological 5 February, 2001 - 14:20 Page 13 of 13 DrillQuest 2.00.06 Sperry-Sun Anficollision Report Comlmny: BPAmoco ])ate: ~1 Time: 13:46:43 Page: Reference Site: PB W Pad Co-oP) Re~renee: Well: W-201, True North Referenee We~: W-201 Vertical (TVD) Rd'erenee: W-201: N-TES (~ 83.2' 83.2 RefereneeWeElmth: Plan W-201 Db: Oracle GLOBAL SCAN APPLIED: All welllmths within 200'+ 10el1000 of reference - There are I~teq~olaflon Metlmd: MD [-te~al: 100.0000 It Em. or Medal: ISCWSA Ellipse Depth Range: 83.2000 to 12811.2400 ft ~ Method: Trav Cylinder North Mn~tmm l~lusd 472.8040 ff Error Snrface: Ellipse + Casing Cas~g Pob~ts tt in in ~2895.-~1 2683.2(XX) 9.62 12.25 95/8" r7748.7765 5213.2000 7.00 8.50 7,, 1~811.2400 5403.2501 4.50 6,00 41/2', Plan: W-201 Wp02 Date Composed: 02/01/2001 Version: Principal: Yes Tied-to: From Well Ref. Point PB W Pad W-17 W-17 Vl 1196.2684 1200.0000 319.4333 29.2163 290.2170 Pass: Major Risk PB W Pad W-18 W-18 V1 1196.6891 1200.0000 284.6885 30.5017 254.1868 Pass: Major Risk PB W Pad W-19A W-19A V5 1197.0773 1200.0000 249.2829 27.6484 221.6345 Pass: Major Risk PB W Pad W-19 W-19 V1 1197.0773 1200.0000 249.2829 27.6484 221.6345 Pass: Major Risk PB W Pad W-200PB1 W-200PB1 V7 1399.1907 1400.0000 39.5621 30.0570 9.5107 Pass: Major Risk PB W Pad W-200 W-200 V4 Plan: Undefin 1399.1991 1400.0000 39.6489 29.4836 10.1729 Pass: Major Risk PB W Pad W-20 W-20 V1 1197.5182 1200.0000 212.8613 27.7171 185.1442 Pass: Major Risk PB W Pad W-21A W-21A V3 Plan: Define 999.0279 1000.0000 172.3464 32.5191 139.8302 Pass: Major Risk PB W Pad W-21 W-21 V1 999.0279 1000.0000 172.3484 32.7202 139.6292 Pass: Major Risk PB W Pad W-22 W-22 V1 1099,7259 1100.0000 146.3037 28.1876 118.1171 Pass: Major Risk PB W Pad W-23 W-23 V1 1393.9984 1400.0000 104.5043 29.9811 74.5422 Pass: Major Risk PB W Pad W-24 W-24 V1 1199,2814 1200.0000 68.5432 30.3001 38.2431 Pass: Major Risk 0 ? 200 Alaska 0il & Gas Cons. Commission Anchorage GRA 175 150 75 25 25 75 Ti'ax elling C31inder Azimmh (TFO+AZI) [deg] vs Centre Io Cenlre Separado~ [15f H 18 2 8 5 5 oi/~o,,ol ool~~ VENDOR ALASKAO I LA OO DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 012901 CKO12901F 100. O0 100. O0 PYMT (;OMMENTS: Per~ it to Drill l'ee HANDL]:NG INST: S/H - Ter~ie Hub le X4628 CHECK IS I" PAYMENT FOR ITEMS DESCRIBED ABOVE. ~ 1OO. OO 100. OO 'HE A'n'ACHED ;,BP,EXPLORATION (ALASKA),~JN~, '. :. :~, AN~H0'~GEi::::AL~SI~i!:99519-6612 ~;!;'i::~:.I~. i:.? ';;;;~!;ii;' ::. ', ,:i:: i,;" PAY :ALASKA O I L AND ,!::,~AS;;" ';~:·~33 "~ST 7TH '"A,~ENUE:::i;;!;,.': ANCHORAGE AK ~501 .US?DOLLAR $1 O0.00.I AFTER 120 DAYS .,:..". .,....':.:' ,... :':i':i' ,.i:::. '(::.' ,.,,. ' J ':!':":~:~' ii': "'::;: '?"~;'~"'i" ";''i'':i'''~ :=''::~:*: WELL PERMIT'CHEcKLIST ~, coMpANy .Z~ ~ ' WELL NAME'~~-) -'.2_o / FIELD & POOL/~Z~'' .~'~-~Jc.x' ~,~'~r' W'~i~'~SS r~/~'~' /-*'7 ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available' in drilling unit ............ 8. If deviated, is wellbore plat included ............. ... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can.be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons ..... ' ..... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ....... ~ ...... 23. If diverter required, does it meet regulations .......... 24. Drilling .fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to '~,~-~.~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ......... 28. Work will occur without operation shutdown... ........ 29. Is presence of H2S gas probable ................. PROGRAM: exp __ dev "2<' redrll __ serv ~ wellbore seg ann. disposal para req ~ GEOL AREA ~ ~ C~ UNIT# //' ~/'~' ,~' ~ ,GEOLOGY 30. 32. / 34. ON/OFF SHORE N ,. LYJ .1~, . ' _ .. ,. ~ , Permit can be issued wlo hydrogen sulfide measures ....... Y N / ~,.{- c,,,~> e..~,,~,3~,~SJ ~~~ ~ ~ Data presented on potential ove~ressure zones ....... ~~,~/~ ' x Seismic analysis of shallow gas zones ............. ~ , Seabed ~ndition suwey (if off-shore) ............. ' Conta~ name/phone for weekly progress repo~s [explorato~ o~ Y N ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei .... ~,PPR DATE (B) will not contaminate freshwater; or cause drilling waste... to surface; ' ' (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from a pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. GEOLOGY: ENGINEERING:, 'lq.C/Annular COMMISSION: Y'N ~ Y N Y N Comments/Instructions: O Z O --I ill c:~soffice\wordian~iana\checklist'(rev. 111011100) . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this . nature is accumulated at the end of the file under APPE .N. DIXi No 'special'effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Wed Sep 19 12:53:49 2001 Reel Header Service name ............. LISTPE Date ..................... 01/09/19 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 01/09/19 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 1 AK-MM-10161 M. HANIK J. RALL W-201 500292300700 BP Exploration (Alaska), Inc. Sperry Sun 14-SEP-01 MWD RUN 2 MWD RUN 3 AK-MM-10161 AK-MM-10161 M. HANIK R. KRELL R. BORDES R. BORDES 21 llN 12E 4829 1177 .00 81.30 52.80 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 12.250 20.000 110.0 2ND STRING 8.750 9.675 2873.0 3RD STRING 6.125 7.000 7738.0 PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 3. MWD RUN 2 IS DIRECTIONAL WITH DGR AND ELECTROFiAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4), STABILIZED LITHO-DENSITY (SLD), AND COMPENSATED NEUTRON POROSITY (CNP). MWD RUN 3 IS DGR, EWR-4, SLD, AND COMPENSATED THERMAL NEUTRON POROSITY (CTN). CNP AND CTN ARE PRESENTED AS ONE POROSITY LOG. GAP IN BULK DENSITY AND STANDOFF CORRECTION DATA BETWEEN 7674' MD / 5218' TVD AND 7738' MD / 5222' TVD IS DUE TO SLD TOOL RESPONSE IN CASING. GAP IN RESISTIVITY DATA BETWEEN 7685' MD / 5219' TVD AND 7703' MD / 5220' TVD IS DUE TO CHANGE IN SENSOR DISTANCE-FROM-BIT BETWEEN RUNS TWO AND THREE. 6. DEPTH SHIFTING IS WAIVED PER THE E-MAIL OF 6/12/2001 FROM G. BERNASKI OF BP EXPLORATION (ALASKA) INC. LOG AND HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH REFERENCE. 7. MWD RUNS 1-3 REPRESENT THE MWD DATA FOR WELL W-201 WITH API# 50-029-23007-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10343' MD, 5323' TVD. SROP = SMOOTHED RATE OF PENETRATION SGRC = SMOOTHED GAMMA RAY COMBINED SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( EXTRA SHALLOW SPACING ) SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( SHALLOW SPACING ) SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( MEDIUM SPACING ) SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( DEEP SPACING ) SFXE = SMOOTHED FORMATION EXPOSURE TIME SBD2 = SMOOTHED BULK DENSITY (LOW-COUNT BIN) SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN) TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE) SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE) PARAMETERS USED IN NEUTRON / POROSITY LOG CALCULATIONS: HOLE SIZE: 8.75", 6.125" MUD WEIGHT: 9.1 - 9.8 PPG MUD FILTRATE SALINITY: 700 - 28,000 PPM CHLORIDE FORMATION WATER SALINITY: 20,000 PPM CHLORIDE FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/19 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUM~LARY PBU TOOL CODE START ROP GR 43 NCNT 2801 NPHI 2801 FCNT 2801 PEF 2812 RPX 2823 RPS 2823 RPM 2823 RPD 2823 FET 2823 RHOB 2873 DRHO 2873 $ BASELINE CURVE FOR SHIFTS: DEPTH 0 5 5 5 5 5 0 0 0 0 0 5 5 CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REMARKS: STOP DEPTH 10343.0 10288.0 10240.0 10240.0 10240.5 10256.0 10295 0 10295 0 10295 0 10295 0 10295 0 10256 0 10256 0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 43.5 2885.0 2 2885.5 7747.5 3 7748.0 10343.0 MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 RHOB MWD G/CC 4 1 68 32 9 DRHO MWD G/CC 4 1 68 36 10 PEF MWD B/E 4 1 68 40 11 NPHI MWD PU 4 1 68 44 12 NCNT MWD CP30 4 1 68 48 13 FCNT MWD CP30 4 1 68 52 14 First Name Service Unit Min Max Mean Nsam Reading DEPT FT 0 10343 5171.5 20687 0 ROP MWD FT/H 0 643.69 139.741 20493 0 GR MWD API 11.15 132.87 70.6486 20490 43.5 RPX MWD OHMM 0.31 2000 9.25152 14910 2823 Last Reading 10343 10343 10288 10295 RPS MWD OHMM 0.37 2000 RPM MWD OHMM 0.17 2000 RPD MWD OHMM 0.24 2000 FET MWD HOUR 0.18 102.22 RHOB MWD G/CC 1.23 3.21 DRHO MWD G/CC -0.45 0.72 PEF MWD B/E 1.18 14.28 NPHI MWD PU 3.09 76.13 NCNT MWD CP30 2024 36069 FCNT MWD CP30 110 1190 First Reading For Entire File .......... 0 Last Reading For Entire File ........... 10343 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/19 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 10.3928 14910 14.1082 14910 26.1986 14910 2.26922 14910 2.25933 14642 0.0773897 14642 3.01102 14888 33.7076 14878 9032.46 14878 488.673 14879 2823 2823 2823 2823 2873.5 2873.5 2812.5 2801.5 2801.5 2801.5 10295 10295 10295 10295 10256 10256 10256 10240 10240 10240.5 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/19 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 43.5 2830.0 ROP 98.5 2885.0 $ LOG HEADER DATA DATE LOGGED: 24-MAY-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.16 DATA TYPE (MEMORY OR REAL-TIME): Real-Time TD DRILLER (FT): 2885.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .1 MAXIMUM ANGLE: 53.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PBO2030HG8 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 12.250 DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: SPUD MUD DENSITY (LB/G): 9.50 MUD VISCOSITY (S): 289.0 MUD PH: 9.3 MUD CHLORIDES (PPM): 300 FLUID LOSS (C3): 9.5 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 .0 75.0 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 43.5 2885 1464.25 5684 ROP MWD010 FT/H 0 643.69 116.362 5574 GR MWD010 API 21.49 131.35 62.5754 5574 First Reading 43.5 98.5 43.5 Last Reading 2885 2885 2830 First Reading For Entire File .......... 43.5 Last Reading For Entire File ........... 2885 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/19 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/19 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW 5EWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 .5000 DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE FCNT NCNT NPHI PEF RPM RPD RPS RPX FET GR DRHO RHOB ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE START DEPTH STOP DEPTH 2801.5 7662.5 2801.5 7662.5 2801.5 7662.5 2812.5 7674.0 2823.0 7685.5 2823.0 7685.5 2823.0 7685.5 2823.0 7685.5 2823.0 7685.5 2830.5 7693.0 2873.5 7674.0 2873.5 7674.0 2885.5 7747.5 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL {FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 01-JUN-01 Insite 66.16 Real-Time 7748.0 50.6 83.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB02034HNLRG6 EWR4 ELECTROMAG. RESIS. 4 PB02034HNLRG6 SLD STABILIZED LITHO DEN PB02034HNLRG6 CNP COMPENSATED NEUTRON PB02034HNLRG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 12.250 LSND 9.80 48.0 9.5 700 3.0 2.900 71.0 1.690 127.0 4.200 71.0 5.000 71.0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset DEPT FT 4 1 68 0 ROP MWD020 FT/H 4 1 68 4 GR MWD020 API 4 1 68 8 RPX MWD020 OHMM 4 1 68 12 RPS MWD020 OHMM 4 1 68 16 RPM MWD020 OHMM 4 1 68 20 RPD MWD020 OHMN 4 1 68 24 FET MWD020 HOUR 4 1 68 28 RHOB MWD020 G/CC 4 1 68 32 DRHO MWD020 G/CC 4 1 68 36 PEF MWD020 B/E 4 1 68 40 NPHI MWD020 PU 4 1 68 44 NCNT MWD020 CP30 4 1 68 48 FCNT MWD020 CP30 4 1 68 52 Channel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Name Service Unit Min Max Mean DEPT FT 2801.5 7747.5 5274.5 ROP MWD020 FT/H 0 637.16 162.332 GR MWD020 API 11.15 127.7 68.7015 R?X MWD020 OHMM 1.03 2000 10.206 RPS MWD020 OHMM 0.9 2000 11.5006 RPM MWD020 OHMM 0.31 2000 11.6025 RPD MWD020 OHMM 0.45 2000 26.9113 FET MWD020 HOUR 0.18 102.22 2.29374 RHOB MWD020 G/CC 1.23 3.21 2.22421 DRHO MWD020 G/CC -0.45 0.69 0.073795 PEF MWD020 B/E 1.45 13.62 3.17852 NPHI MWD020 PU 14.29 76.13 37.6461 NCNT MWD020 CP30 2024 3768 2698.21 FCNT MWD020 CP30 402 1029 589.426 First Reading For Entire File .......... 2801.5 Last Reading For Entire File ........... 7747.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/19 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Nsam 9893 9725 9726 9726 9726 9726 9726 9726 9602 9602 9724 9723 9723 9723 First Reading 2801.5 2885.5 2830.5 2823 2823 2823 2823 2823 2873.5 2873.5 2812.5 2801.5 2801.5 2801.5 Last Reading 7747.5 7747.5 7693 7685.5 7685.5 7685.5 7685.5 7685.5 7674 7674 7674 7662.5 7662.5 7662.5 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/19 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 .5000 DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE FCNT NPHI NCNT PEF GR RPS RPX RPM RPD FET RHOB DRHO ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE START DEPTH 7651.5 7651.5 7651.5 7666.0 7693.5 7703.5 7703.5 7703.5 7703.5 7703.5 7736.5 7736.5 7748.0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10240.0 10240.0 10240.0 10256.0 10288 0 10295 0 10295 0 10295 0 10295 0 10295 0 10256 0 10256 0 10343 0 06-JUN-01 In$ite 66.16 Real-Time 10343.0 73.8 92.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER EWR4 ELECTROMAG. RESIS. 4 PB02035HAGR4 DGR DUAL GAMMA RAY PB02035HAGR4 SLD STABILIZED LITHO DEN PB02035HAGR4 CTN COMP THERMAL NEUTRON PB02035HAGR4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet 12.250 LSND 9.10 50.0 9.3 28000 4.5 .280 69.0 .190 104.0 .240 69.0 .190 69.0 Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD030 FT/H 4 1 68 GR MWD030 API 4 1 68 RPX MWD030 OHMM 4 1 68 RPS MWD030 OHMM 4 1 68 RPM MWD030 OHMM 4 1 68 RPD MWD030 OHMM 4 1 68 FET MWD030 HOUR 4 1 68 RHOB MWD030 G/CC 4 1 68 DRHO MWD030 G/CC 4 1 68 PEF MWD030 B/E 4 1 68 NPHI MWD030 PU 4 1 68 NCNT MWD030 CP30 4 1 68 FCNT MWD030 CP30 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 Name Service Unit Min Max DEPT FT 7651.5 10343 RO? MWD030 FT/H 0 486.73 GR MWD030 API 39.81 132.87 R?X MWD030 OHMM 0.31 1539.73 RPS MWD030 OHMM 0.37 1540.24 RPM MWD030 OHMM 0.17 2000 RPD MWD030 OHMM 0.24 2000 FET MWD030 HOUR 0.19 73,86 RHOB MWD030 G/CC 2.11 2.92 DRHO MWD030 G/CC -0.07 0.72 PEF MWD030 B/E 1.18 14.28 NPHI MWD030 PU 3.09 50.09 NCNT MWD030 CP30 13688 36069 FCNT MWD030 CP30 110 1190 First Reading For Entire File .......... 7651.5 Last Reading For Entire File ........... 10343 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/19 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Mean 8997.25 122. 601 82.9678 7.46069 8.31424 18.8091 24.8616 2.22323 2.32624 0.0842381 2.72845 26.3413 20957.6 298.053 Nsam 5384 5191 5190 5184 5184 5184 5184 5184 5040 5040 5181 5178 5178 5178 First Reading 7651.5 7748 7693.5 7703 5 7703 5 7703 5 7703 5 7703 5 7736 5 7736 5 7666 7651.5 7651.5 7651.5 Last Reading 10343 10343 10288 10295 10295 10295 10295 10295 10256 10256 10256 10240 10240 10240 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 01/09/19 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 01/09/19 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Scientific Technical Services Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File