From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com>
Sent: Thursday, August 20, 2015 4:41 PM
To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M IL; AK, OPS GC2 Wellpad Lead; AK, OPS
Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations
Superintendent; AK, D&C Well Services Operations Superintendent; AK, RES GPB West
Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS WELL PAD S; Peru, Cale;
Wallace, Chris D (DOA)
Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C
Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R;
Morrison, Spencer; Regg, James B (DOA)
Subject: OPERABLE: Producer S-08B (PTD #2010520)TIFL Passed
Attachments: Producer S-08B (PTD #2010520) TIO Plot.docx
All,
Producer S-08B (PTD#2010520) passed a TIFL on 08/15/2015. The passing TIFL confirms two competent barriers in the
wellbore. The well is reclassified as Operable.
A copy of the TIO plot is included for reference.
Thank you,
Kevin Parks
(Alternate. Whitney Pettus)
BP Alaska-Well Integrity Coordinator
GWglçellobaWls
ion SOWED AUG 2 4 2015
Office: 907.659.5102
WIC Email:AKDCWellIntegritvCoordinator@bp.com
FromK, D&C Well Integrity Coordinator
Sent:.�riday, August 14, 2015 6:45 PM
To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski,
Doug A; Daniel, Ryan; AK, D&C Wireline Operations Superintendent; AK, D&C Well Services Operations Superintendent;
AK, RES GPB We ells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS WELL PAD S; Peru, Cale;
'chris.wallace@alaska. '
Cc: AK, D&C Well Integrity oordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer;
AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Whitney; 'Regg, James B (DOA) (jim.regq@alaska.gov)'
Subject: NOT OPERABLE: Producer S-08B (PTD #2010520) Sustained Inner Annulus Casing Pressure above MOASP
All,
Producer S-08B (PTD#2010520) was reported to have sustained ' er annulus casing pressure above MOASP on August
10, 2015. The pressures were reported to be TBG/IA/OA= 2090/2060/280 si. At this time, the well has been
reclassified as Not Operable until integrity can be verified or restored.
Plan Forward:
1. Downhole Diagnostics:TIFL
1
Producer S-08B(PTD#2010520)TIO Plot
Well 01
4.
Y.
-0-n•
On
•- 6
lac
06�'�5 ro]'tt ILIO{ O['tVaOfir.-.... _ .. ,15 LIMA_ ;T.
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com>
Sent: Friday, August 14, 2015 6:45 PM
To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead; AK, OPS
Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations
Superintendent; AK, D&C Well Services Operations Superintendent; AK, RES GPB West
Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS WELL PAD S; Peru, Cale;
Wallace, Chris D (DOA)
Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C
Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R;
Pettus, Whitney; Regg, James B (DOA)
Subject: NOT OPERABLE: Producer S-08B (PTD #2010520) Sustained Inner Annulus Casing
Pressure above MOASP
Attachments: Producer S-08B (PTD 2010520) TIO Plot.docx
All,
Producer S-08B (PTD#2010520) was reported to have sustained inner annulus casing pressure above MOASP on August
10, 2015. The pressures were reported to be TBG/IA/OA= 2090/2060/280 psi. At this time, the well has been
reclassified as Not Operable until integrity can be verified or restored.
Plan Forward:
1. Downhole Diagnostics:TIFL
2. Well Integrity Engineer: Additional diagnostics as needed
A copy of the TIO plot has been included for reference.
Please call with any questions or concerns.
Thank you,
Whitney Pettus SCANNED AUG 2 4 2015
(Alternate: Kevin Parks)
BP Alaska-Well Integrity Coordinator
GV"
WIC Office: 907.659.5102
WIC Email: AKDCWeIlIntegrityCoordinator@BP.com
1
Producer S-08B (PTD 2010520) TIO Plot August 14, 2015
s.
IMO
+Th.
COO G
♦ 0M
—0-000
ax
06.0.;'5 S 06'815 0(25'3 07,615 0lm% •7M15 07121-15 01/10,, %MI5 0610111
Imagi'" ~roject Well History File Cover I' ~e
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
C~ DJ- ~)~~Well History File Identifier
RESCAN D,~TA L DATA
[] Color items: ~ Diskettes, No.
[] Grayscale items: [] Other, No/Type
[] Poor Quality Originals:
[] Other:
NOTES:
BY:
BEVERLY ROBIN VINCENT SHERYL ~WINDY
OVERSIZED (Scannable)
[] Maps:
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
Project Proofing
BY:
BEVERLY ROBIN VINCENT SHERYL~"~..WINDY
Scanning Preparation / x 30 = ,30
BY: BEVERLY ROBIN VINCENT SHERYL(~WINDY
Production Scanning
Stage I PAGE COUNT FROM SCANNED FILE: ~
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~ YES~
BY:
Stage 2
BY~
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES )
NO
IF NO IN STAGE t, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES NO
BEVERL~INCENT SHERYL MARIA WINDY DATE:~.,~"~"~Si'~~
RESCANNEDB~': BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE:
Is~
General Notes or Comments about this file:
Quality Checked
12/10/02Rev3NOTScanned.wpd
~
BP Exploration (Alaska) Inc.
Attn: Well Integriry Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
June 25, 2009
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of S-Pad
Dear Mr. Maunder,
~
~
~
,~ ~
Ju~ o r zoos
~1~~~.~ ~i~ ~ Gas Gon~o Car~mis~Q~R
Anc~~r~~~
ot,~ ~- ~~~-
~ -o-~ ~
Enclosed please find a spreadsheet with a list of wells from S-Pad that were treated
with corrosion inhibitor in the surface casing by conductor annulus. The corrosion
inhibitor is engineered to prevent water from entering the annular space and causing
external corrosion that could result in a surface casing leak to atmosphere. The
attached spreadsheet represents the well name, top of cement depth prior to filling and
volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
x:* ~"~i~1~~? ~ .fU~. ~~ ~ CGi! i
Torin Roschinger
BPXA, Well Integrity Coordinator
~. J
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Spad
~
nnrn,
Fi/25/2009
Well Name
PTD It
Initial top af
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corcosion
inhibRod
sealant date
ft bbls it na al
S-018 1952020 025 NA 0.25 NA 2.6 5/30/2009
S-02A 1941090 025 NA 025 NA 1.7 5/25/2009
5-03 7817900 7325 NA 1325 NA 92.65 5/20/2009
5-04 1830790 0 NA 0 NA 0.9 5J25/2009
S-OSA 7951890 0 NA 0 NA 0.9 5/26/2009
S-O6 1821650 0 NA 0 NA 0.9 5/26/2009
S-07A 1920980 0 NA 0 NA 0.9 5/26/2009
S-OBB 20f0520 0 NA 0 NA 0.85 5/27/2009
S-09 7821040 1.5 NA 1.5 NA 9.4 5/31/2009
S-10A 1911230 0.5 NA 0.5 NA 3.4 5/31/2009
S-11B 1990530 0.25 NA 025 NA 1.7 5/27/2009
S-i2A 1851930 025 NA 025 NA 1.7 6/1/2009
5-13 1821350 8 NA 8 NA 55.3 6/1/2009
S-15 1840170 025 NA 025 NA 3 6/2/2009
S-17C 2020070 025 NA 025 NA 2.6 6/1/2009
S-18A 2021630 0.5 NA 0.5 NA 3 6/2/2009
S-19 1861160 0.75 NA 0.75 NA 22 5/19/2009
S-20A 2010450 0.25 NA ~ 025 NA 1.3 5/79/2009
S-21 1900470 0.5 NA 0.5 NA 3.4 5/25/2009
S-22B 1970510 0.75 NA 0.75 NA 3 5/79/2009
5-23 1901270 025 NA 025 NA 1.7 5/25/2009
S-248 2031630 0.5 NA 0.5 NA 2.6 5/25/2009
S-25A 1982140 0.5 NA 0.5 NA 2.6 5/25/2009
5-26 1900580 0.75 NA 0.75 NA 3.4 5/26/2009
S-27B 2031680 0.5 NA 0.5 NA 2.6 5/31/2009
S-288 2030020 0.5 NA 0.5 NA 2.6 5/31/2009
S-29AL7 1960120 0 NA 0 NA 0.85 5/27/2009
5-30 1900660 0.5 NA 0.5 NA 5.1 5/31/2009
S-31A 1982200 0.5 NA 0.5 NA 3.4 5/26/2009
S32 1901490 0.5 NA 0.5 NA 3.4 5/31/2009
S-33 1921020 0.5 NA 0.5 NA 4.3 5/26/2009
5-34 7921360 0.5 NA 0.5 NA 3.4 5/31/2009
5-35 1921480 0 NA 0 NA -.e5in 5/31/2009
5-36 1921160 0.75 NA 0.75 NA 425 5/27/2009
S-37 1920990 1.25 NA 125 NA 11.9 5/27/2009
5-38 1921270 0.25 NA 025 NA 702 5/27/2009
5-4t 7960240 7.5 NA 1.5 NA 11.1 5/30/2009
S-42 7960540 0 NA 0 NA 0.9 5/30/2009
S-43 7970530 0.5 NA 0.5 NA 1.7 5/28/2009
S-44 1970070 025 NA 025 NA 1.7 5/28/2009
5-100 2000780 2 NA 2 NA 21.3 5/29I2009
S-101 2001150 1.25 NA 125 NA 11.9 5/29/2009
S-t02L1 2031560 125 NA 125 NA 11.7 5/31/2009
S-103 2001680 1.5 NA 1.5 NA 71.9 5/18/2009
S-104 2001960 1.75 NA 7.75 NA 15.3 5/20/2009
5-105 2001520 4 NA 4 NA 32.7 5/20/2~9
5-106 2010120 1625 NA 1625 NA 174.3 6!2/2009
5707 2071130 225 NA 225 NA 28.9 5/18/2009
S-~08 2011000 3.5 NA 3.5 NA 40 5/30/2009
S-109 2022450 2 NA 2 NA 21.3 5/30/2009
S-tt0 2011290 11.75 NA 11.75 NA 98.6 5/30/2009
S-7t1 2050510 2 NA 2 NA 19.6 5/30/2009
5-112 2021350 0 NA 0 NA 0.5 5/30/2009
5-113 2021430 1.75 NA 1.75 NA 22.1 5/18/2009
S-114A 2021980 125 NA 125 NA 10.2 5/30/2009
S-t15 2022300 2.5 NA 2.5 NA 272 5/29/2009
5-116 2031810 1.5 NA 1.5 NA 13.6 5/28/2009
5-117 2030120 1.5 NA 1.5 NA t5.3 5/29/2009
S-718 2032000 5 NA 5 NA 76.5 5/28/2009
S-tis 204f620 1 NA i NA 5.2 5/30/2009
S-720 2031980 5.5 NA 5.5 NA 67.2 5/29/2009
5-121 2060410 4.5 NA 4.5 NA 53.8 5/28/2009
S-722 2050810 3 NA 3 NA 27.3 5/29/2009
5-123 2041370 7.5 NA 1.5 NA 20.4 5/26/2009
5-~24 2061360 1.75 NA 1.75 NA ~1.9 5/26/2009
S-t25 2070830 225 NA 225 NA 20.4 5/28/2009
S-126 20710970 125 NA 7.25 NA 15.3 6/1/2009
S-200 1972390 125 NA 725 NA 14.5 5/28/2009
5-207 2001840 0 NA 0 NA 0.85 61t9/2009
S-213A 2042130 2 NA 2 NA 73.6 5/29/2009
S-215 2021540 2 NA 2 NA 18.7 6/1/2009
S-276 2001970 4.75 NA 4.75 NA 51 5/29/2009
5-217 2070950 025 NA 025 NA 1.7 6l1/2009
5-400 2070740 2 NA 2 NA 9.4 5/28/2009
5-401 2060780 16 NA 16 NA 99.5 6/2/2009
S-SOa 0 NA 0 NA 0.85 5/2&2009
I~ J
• STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMON
REPORT OF SUNDRY WELL OPERATIONS ~~aska n., p.
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulated Other O~fi'ifSSl
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver Time Extension Q~ ~ ta~@
Change Approved Program ~ Operat. Shutdown ~ Perforate Q . Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development ~ Exploratory 201-0520 -
3. Address: P.O. Box 196612 Stratigraphic ~~~ Service ~~ 6. API Number:
Anchorage, AK 99519-6612 50-029-20778-02-00 -
7. KB Elevation (ft): 9. Well Name and Number:
67.63 KB - PBU S-08B -
8. Property Designation: 10. Field/Pool(s): _
ADLO-028257 - PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 10650 ~ feet Plugs (measured) None
true vertical 8818.41. feet dunk ({nea~ured) None
Effective Depth measured 10587 feet
true vertical 8792 feet
Casing Length Size MD TVD Burst Collapse
Conductor 110 20" Surface - 110 Surface - 110
Surface 2672 13-3/8" 72# L-80 Surface - 2672 Surface - 2672 5380 2670
Intermediate 8892 9-5/8" 47# L-80 Surface - 8892 Surface - 8574 6870 4760
Liner 547 7" 26# L-80 8413 - 8960 8121 - 8638 7240 5410
Scab Liner 645 5" 15# 13CR80 8315 - 8960 8029 - 8638 8290 7250
Liner 2298 3-3/16"X2-7/8" 8352 - 10650 8662 - 8875
Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _
True Vertical depth: _ _ _ _ _
Tubing: (size, grade, and measured depth) 4-1/2" 12.6# CR-80 SURFACE - 8314'
0 0 -
Packers and SSSV (type and measured depth) 9-5/8"X4-1/2" BAKER SC-3 PAH PKR 8231'
0 0
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 51 244 451 210
Subsequent to operation: SI
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory ~~ Development ~' ' Service ~
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil - Gas r WAG GINJ ~ WINJ ~ WDSPL
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Pr Title Data Management Engineer
Signature Phone 564-4944 Date 3/9/2009
#~~~~~
~/o,~
-~AR 0 9 2009
Form 10-404 R vised 04/2006 ,~ ,.~ . !cf'3 ~ Submit Original Only
S-086
198-228
PERF ~4TT~4CHMENT
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
S-08B 4/17/01 PER 10,125. 10,180. 8,731.3 8,734.99
S-08B 4/17/01 PER 10,260. 10,295. 8,741.54 8,743.11
S-08B 4/27/01 PER 10,200. 10,240. 8,736.78 8,740.19
S-08B 4/27/01 PER 10,315. 10,360. 8,743.6 8,744.
S-08B 4/27/01 PER 10,380. 10,495. 8,744.85 8,762.31
S-08B 4/27/01 PER 10,515. 10,570. 8,767.54 8,785.36
S-08B 7/23/01 APF 9,570. 9,800. 8,768.11 8,741.28
S-08B 7/23/01 APF 9,870. 10,125. 8,740.78 8,731.3
S-08B 3/4/09 APF 8,943. 8,961. 8,622.12 8,639.16
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
•
S-~gB
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVITYDATE SUMMARY
3/3/2009 '**WELL FLOWING ON ARRIVAL. INITIAL T/I/O = 650/1100/100 PSI***
RIG UP E-LINE
***LOG CONTINUED ON 4-MAR-2009***
3/4/2009,***JOB CONTINUED FROM 3-MAR-2009***
.PERFORATE 8943'-8961 WITH 2" PJ OMEGA 6 SPF 60 DEG PHASING
.ENTRANCE HOLE DIAMETER = 0.22", PENETRATION = 21.8"
FINAL T/I/O =800/1100/0
WELL LEFT FLOWING. DSO NOTIFIED. VALVES LEFT AS FOUND.
*"*JOB COMPLETE*"*
FLUIDS PUMPED
BBLS
1 MEOH
1 Total
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker. doc
Permit to Drill 2010520
MD 10650 --~ TVD
DATA SUBMITTAL COMPLIANCE REPORT
41'18~2003
Well Name/No. PRUDHOE BAY UNIT S-08B
Operator BP EXPLORATION (ALASKA) INC
8818 --- Completion Dat 4/27/2001 ~.~ Completion Statu 1-OIL
Current Status 1-OIL
APl No. 50-029-20778-02-00
UIC N
REQUIRED INFORMATION
Mud Log N..~o Sample N__~o
Directional Survey
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Fret
~ D Ver LIS Verification
'd~ Ver LIS Verification
~ C Pdf Cn See Notes
(data taken from Logs Portion of Master Well Data Maint)
Log Log Run
Name Scale Media No
Interval
Start Stop
OH I Dataset
CH Received Number Comments
MWD Survey
Directional Survey
10165
10382 10532 Open
FINAL CH
FINAL CH
FINAL 10382 10532 OH
1 8959 10601 Open
1 8959 10601 Open
1 8959 10650 Case
6/25/2001 /~165
5/25/2001
5/25/2001
6/25/2001 ~0~ 5
9/10/2002 ~I'~33
9/10~2002
12/3/2002 ~1~1363
10382-10532
MWD Survey, Digital Data
Directional Survey, Digital
Data
10382-10532, Digital Data
Digital Well Log data
Well Cores/Samples Information:
Name
ADDITIONAL INFORMATION
Well Cored? YT~
Chips Received? ~
Analysis
R ~.r~.ivc. d ?
Start
Interval
Stop
Dataset
Sent Received Number
Daily History Received? (~ N
Formation Tops Y~N
Comments
Comments:
Compliance Reviewed By: Date:
To:
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
December 02, 2002
MWD Formation Evaluation Logs' S-08B,
AK-MW-10135
S-08B:
Digital Log Images
50-029-20778-02
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING. A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center, LR2-1
900 E. Benson 'Blvd.
Anchorage, Alaska 99508
Date:
RECEIV'E9
DEC 07) ?_002
Alaska 0;~ & Gas Cons. Commission
WELl, LOG TRANSM1TFAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
RE: MWD Formation Evaluation Logs S-08B, AK-MW-10135
September 05, 2002
1 LDWG formatted Disc with verification listing.
API#: 50-029-20778-02
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO TIlE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
SEP lO 2002
Alaska 0~1 & 6a~ Cons. Commission
Anchorage
(i STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate
[] Pull Tubing [] Alter Casing [] Repair Well [] Other
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Inc. [] Development KBE = 67.63'
"3. Address [] Exploratory 7. Unit or Property Name
[] Stratigraphic Prudhoe Bay Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
4. Location of well at surface 8. Well Number
1640' SNL, 1525' EWL, SEC. 35, T12N, R12E, UM S-08B
At top of productive interval 9. Permit Number / Approval No.
201-052
3324' SNL, 610' EWL, SEC. 35, T12N, R12E, UM 10. APl Number
At effective depth 50-029-20778-02
4609' SNL, 18' EWL, SEC. 35, T12N, R12E, UM 11. Field and Pool
At total depth Pru~BFy~ Friel~.J P~dl'~ Bay
4666' SNL, 22' EWE, SEC. 35, T12N, R12E, UU Po(I'I'~. ~, ~[~i
12. Present well condition summary
Total depth: measured 10650 feet Plugs (measured) AUG 2 2 200]
true vertical 8818 feet
Effective depth: measured 10587 feet Junk (measured) Alaska Oil & Gas Cons. Commission
true vertical 8792 feet Anchorage
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110'
Surface 2672' 13-3/8" 3720 cuft Arcticset II 2672' 2672'
Intermediate 8892' 9-5/8" 1218 cuft Class 'G', 130 cuft AS I 8892' 8574'
Production
Liner 547' 7" 420 cuft Class 'G' 8413' - 8960' 8121' - 8638'
Scab Liner 645' 5" 200 cuft Class 'G' 8315' - 8960' 8029' - 8638'
Liner 2298' 3-3/16" x 2-7/8" 8352' - 10650' 8662' - 8875'
Perforation depth: measured 9570'- 9800', 9870'- 10180', 10200'- 10240', 10260'- 10295', 10315'- 10360', 10380'- 10495',
10515' - 10570'
true vertical 8768' - 8741', 8731' - 8735', 8737' - 8740', 8742' - 8743', 8744' - 8744', 8745' - 8762', 8768' - 8785'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13CR80 to 8314'.
Packers and SSSV (type and measured depth) 9-5/8" x 4-1/2" Baker SC-2 PAH packer at 8231' and a 4-1/2" Otis SSSV Landing Nipple
at 2801'.
113. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
'~4'. Representative Daily Averaqe Production or Iniection Data '
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: SI
Subsequent to operation: 54 474 633
15. Attachments 16. Status of well classifications as:
[] Copies of Logs and Surveys run
[] Oil [] Gas [] Suspended Service
[] Daily Report of Well Operations
17. I hereby certify that the f. oregoing is true an~d correct to the best of my knowledge
__ Signed Son~]~~~~~ .... Title Technical Assistant Date
Prepared By Name/Number: Sondra Stewman, 564-4750
~ .............. _~_ ..--,_ ,. _--_ .. :. : .'. ·
Form 10-404 Rev. 06/15/88
ORiGiNAL'
Submit In Duplicate
BP AMOCO Page 1 of 6
Operations Summary Report
Legal Well Name: S-08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 7/23/2001
Contractor Name: NABORS Rig Release: 7/23/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
4/20/2001 00:00 - 14:00 14.00 MOB P PRE Derrick up move from MPU F-73 to PBU S-08A.
14:00 - 15:00 1.00 MOB P PRE Spot over well. Level rig. Establish phone & network.
15:00 - 16:30 1.50 BOPSUR P DECOMP Accept rig @ 1500 hrs 4/20/01. Remove tree cap. NU BOPE.
16:30 - 18:00 1.50 BOPSUR P DECOMP Wait on DSM berm crew to spot & berm cuttings tank.
18:00- 19:30 1.50 BOPSUF; P DECOMP Finish berm job
19:30 - 20:00 0.50 BOPSUR P DECOMP Fill pits w/KCl water
20:00 - 00:00 4.00 BOPSUR P DECOMP Initial BOPE test. AOGCC waived witness
4/21/2001 00:00 - 01:00 1.00 BOPSUI~ P DECOMP Fin test BOPE
01:00 - 03:00 2.00 BOPSUI~ P DECOMP RU injector. Fill CT w/KCI water. Pump wiper dart(s). First
dart hit at 60.2 bbls. Pump a second volume looking for
second dart-none. Bleed IA from 1560 to 600 psi (gas)
03:00 - 03:30 0.50 BOPSUF~ P DECOMP PT inner reel valve @ 4000. Check well for press, 165 psi.
Bleed to zero
03:30 - 04:00 0.50 STWHIP P WEXlT Install Baker CTC. PT 35k, 3500 psi. Change packoffwhile
WHP bleeds crude to tank
04:00 - 04:45 0.75 STWHIP P WEXlT MU milling BHA
04:45 - 05:25 0.67 STWHIP P WEXlT RIH w/milling BHA #1. Pump at min taking gassy crude
returns to slop tank thru buster
05:25 - 05.:45 0.33 STWHIP P WEXlT Park at 3300' and pressure test ClBP to 850 psi w/16 bbls.
Lots of gas compression. Bled to 700 psi in 3 min. Bleed off
press. IA remained constant at 970 psi
05:45 - 06:15 0.50 STWHIP P WEXlT RIH holding 250 psi BP while circ at 0.8 bpm thru buster
06:15 - 10:00 3.75 STWHIP N WEXlT Burp crude out top of gas buster onto roof. Clean up same.
Continue to circulate while waiting on additional flow back
equipment.
10:00 - 12:30 2.50 STWHIP P WEXlT RU flow back tank. Test hardline to 3000 psi.
12:30 - 13:00 0.50 STWHIP P WEXIT Hold PJSM regarding bleed down procedures.
13:00 - 14:00 1.00 STWHIP 'P WEXlT RIH. Bleed gas to tiger tank. ISITP 1100 psi. Bleed to zero.
Continue displacing well to 1% kcl water.
14:00 - 16:00 2.00 STWHIP P WEXIT Tag whipstock at 8960'. 37k# up, 25K# dn wt. 2700psi@2.8.
Stacking weight, up to 7K. Up to 500 psi mtr work. Unable to
make progress.
16:00 - 17:15 1.25 STWHIP P WEXIT POOH to remove string reamer and check window mill.
17:15-17:45 0.50 STWHIP P WEXIT At surface. Offwell. Standback BHA. Remove string reamer
& DSM. Run window master 6 bladed MM mill.
17:45 - 19:20 1.58 STWHIP P WEXIT RIH with window milling assembly.
19:20 - 20:10 0.83 STWHIP P WEXIT Corr -4.4' at flag to put mill at 8960' 2.5/2300. Work to get
started milling-blades hanging up on top of WS. Corr +2' after
numerous stalls
20:10 - 21:40 1.50 STWHIP P WEXIT Begin steady milling
21:40 - 00:00 2.33 S'TWHIP P WEXIT At 8965.5' (7" casing contact) and pump a sweep 2.5/2400.
Continue milling
4/22/2001 00:00 - 00:20 0.33 STWHIP P WEXIT Stall and overpull at 8969.8'. Wiper to EOT while pump sweep
00:20 - 00:35 0.25 STWHIP P WEXIT Attempt to resume milling and begin losing ground. Lost hole
to 8967.4'
00:35 - 02:00 1.42 STWHIP P WEXIT POOH to check milling assy. Most of window should be cut
(should be ready to fully exit 7" liner)
02:00 - 02:50 0.83 STWHIP N DFAL WEXIT Left two of six Window Master mill blades (one chunk of
3"x3"x2") in hole. MU used 3.80" window mill and 3.80" SR
02:50 - 04:25 1.58 STWHIP P WEXIT RIH w/BHA #3 to mill up junk and dress window
04:25 - 08:00 3.58 STWHIP P WEXIT i Tag WS and corr to 8960'. RIH 2.6/2040 clean to stall at
8965.0'
Mill to 8967.6' and had overpull. Motor work dropped off at
Printed: 7/30/2001 4:00:04 PM
BP AMOCO Page 2 of 6
Operations Summary Report
Legal Well Name: S-08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 7/23/2001
Contractor Name: NABORS Rig Release: 7/23/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
4/22/2001 04:25 - 08:00 3.58 STWHIP P WEXlT 8969'. Appear to be drilling new/open hole.
08:00 - 10:30 2.50 STWHIP P WEXlT Mill ahead in Shublik to 8982'.
10:30 - 13:00 2.50 STWHIP P WEXlT Dress window. Top window @ 8960', btm at 8970'. Smooth.
13:00 - 13:45 0.75 STWHIP P WEXIT Pump 22 bbl bio sweep. Paint EOP flag at 8800'.
13:45 - 15:00 1.25 STWHIP P WEXlT Circ out of hole to PU build assy.
15:00 - 15:30 0.50 STWHIP P WEXlT LD window assembly. DSM & string reamer both gauge at
3.77-78".
15:30 - 16:15 0.75 DRILL P PROD1 MU Build assembly. (BHA # 3). M-09 with 2.4 deg mtr.
16:15 - 18:00 1.75 DRILL P PROD1 RIH. Shallow test mwd for pulses only. Continue in hole.
Correct to EOP flag at 8800'. Add 6' correction. Through
window. Tag TD at 8983'.
18:00 - 19:00 1.00 DRILL P PROD1 Circulate on btm while displacing to used rio-pro. Work on
Sperry PC and DD calcs
19:00 - 21:50 2.83 DRILL P PROD1 Drill ahead in Shublik orienting as necessary for HS TF. Sperry
having trouble with PC's. 2.6/3700/13L
21:50 - 23:00 1.17 DRILL P PROD1 Drill to 9045'. Log up to get on depth w/BHCS 2.1/2970
23:00 - 23:30 0.50 DRILL P PROD1 Add 8.0' to CTD. RIH. Orient around
23:30 - 00:00 0.50 DRILL P PROD1 Drilling 2.6/3700/7L 60-90'/hr from 9053'
4/23/2001 00:00 - 02:00 2.00 DRILL P PROD1 Drill 60-180'/hr 2.4/3500/7R from 9084-9220'. Survey (20 min)
02:00 - 02:15 0.25 DRILL P PROD1 Backream to window. Flag at 8800' EOP
02:15 - 03:40 1.42 DRILL P PROD1 POOH for horizontal assy
03:40 - 06:00 2.33 DRILL P PROD1 Change bit, motor. LD shock sub. Upload and add resistivity.
MU BHA
06:00 - 08:00 2.00 DRILL P PROD1 RIH w/BHA #5. Correct to EOP flag @ 8800: subtract 1'.
Continue in hole.
08:00 - 09:00 1.00 DRILL P PROD1 Log resistivity MADD pass up from TD to top of Zone 4.
09:00 - 10:00 1.00 DRILL P PROD1 Log GR tie in from 9020' up to window. Add 4' correction.
Establish tie in point inside liner.
10:00 - 11:45 1.75 DRILL P PROD1 Drill lateral from 9220'. 2.6/3500. TF:45R. 70-100 fph.
11:45 - 12:15 0.50 DRILL P PROD1 Drill lateral from 9360'. 2.5/3600 TF:110R 100 fph. Mud
wearing out. Weight x-fer slowing ROP. New mud ready. No
vac trucks available.
12:15 - 13:15 1.00 DRILL P PROD1 Short trip to window from 9400'. Hole very smooth.
13:15 - 19:15 6.00 DRILL P PROD1 Drill lateral from 9400-9700'. 2.613700 TF: 55L 90 fph.
Weight x-fer becoming very poor. Wiper to window at 9550'.
Still waiting on vac trucks.
19:15 - 19:45 0.50 DRILL P PROD1 Wiper to window from 9700'
19:45 - 20:15 0.50 DRILL P PROD1 Log up from 9000' to tie-in, add 4.0'
20:15 - 20:45 0.50 DRILL P PROD1 RIH to corr TD @ 9703'
20:45 - 20:55 0.17 DRILL P PROD1 Orient to left
20:55 - 21:45 0.83 DRILL P PROD1 Drilling 2.6/2800/122L from 9703-9770' 40-80'/hr stacking bad,
sli overpulls
21:45 - 22:00 0.25 DRILL P PROD1 Wi'per to window
22:00 - 00:00 2.00 DRILL N FLUD PROD1 Park in liner at 8950'. Circulate and wait on mud (vac trucks
unavailable-now second on list). Current mud is too dirty to
continue 8.8 ppg/2.4% drilled solids
4/24/2001 00:00 - 05:00 5.00 DRILL N FLUD PROD1 Continue circ at 8950' while wait on new mud
05:00 - 05:30 0.50 DRILL P PROD1 RIH. Begin displacing to fresh mud
05:30 - 07:45 2.25 DRILL P PROD1 Drilling from 9770' 60-90'/hr 2.7/3500/148L
07:45 - 09:15 1.50 DRILL P PROD1 Drilling from 9920' 80-100'/hr 2.7/3500/45L
09:15 - 10:15 1.00 DRILL P PROD1 Short trip from 10000'. A little tight at 9650'. Otherwise
smooth.
10:15- 12:15 2.00 DRILL P PROD1 Drilling from 10000' 80-100'/hr 2.7/3500/90L
Printed: 7/30/2001 4:00:0,4 PM
BP AMOCO Page 3 of 6
Operations Summary Report
Legal Well Name: S-08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 7/23/2001
Contractor Name: NABORS Rig Release: 7/23/2001
Rig Name: NABORS 3S Rig Number:
I
Date From-To Hours iActivity Code NPT Phase Description of Operations
4/24/2001 12:15 - 13:15 1.00 DRILL P PROD1 Short trip from 10150' (8664' TVD high point). Hole smooth.
13:15 - 14:45 1.50 DRILL P PROD1 Drilling from 10150' 80-90'/hr 2.7/3500/45L
14:45 - 15:30 0.75 DRILL P ~PROD1 Drilling from 10250' 80-90'/hr 2.7/3600/65R
15:30 - 16:40 1.17 DRILL P PROD1 Short trip from 10301' to the window. Hole smooth.
16:40 - 20:15 3.58 DRILL P i PROD1 Back on bottom. Wiper trip smooth, no problems RIH.
Resume drilling.
Drilling from 10300' 2.7 bpm/3700 psi 145L
20:15 - 20:50 0.58 DRILL P , PROD1 Wiper to window from 10456'
20:50 - 21:10 0.33 DRILL P PROD1 Log tie-in, add 6.0'
21:10-22:00 0.83 DRILL P PROD1 RIHtoTD. Losing4bph
22:00 - 22:30 0.50 DRILL P PROD1 Toggle MWD to drill mode. DS engr experiment w/levelwind.
Orient to around to Iow side to finish hole. Geo's extended the
horizontal before the drop section. Added approx 300' to
TD-still in polygon
22:30 - 23:15 0.75 DRILL P PROD1 Orient to Iow side. Orientor not working properly
23:15 - 23:30 0.25 DRILL P PROD1 Drill to 10474' (8690' TVD) 2.5/3220/145L
23:30 - 00:00 0.50 DRILL P PROD1 Orient around to Iow side
4/25/2001 00:00 - 00:40 0.67 DRILL P PROD1 Continue working to get orientor to point Iow side
00:40 - 02:05 1.42 DRILL P PROD1 Resume drilling from 10474' 2.5/3350/148L (close enough)
02:05 - 02:55 0.83 DRILL P PROD1 Wiper to window from 10586'. Sli overpull at 9550'
02:55 - 03:05 0.17 DRILL P PROD1 Log tie-in, add 1.0'
03:05 - 04:05 1.00 DRILL P PROD1 RIH to TD
04:05 - 05:00 0.92 DRILL P PROD1 Drilling from 10586' 2.4/3200/134L
05:00 - 06:30 1.50 DRILL P PROD1 TD at 10650' (8751' TVD). Begin MAD pass up at 1200'/hr
06:30 - 06:45 0.25 DRILL P PROD1 Tie-in at 8990'. Add 2.0'
06:45 - 08:20 1.58 DRILL P PROD1 POOH. Flag pipe at 8350' EOP, and 6600' EOP.
08:20 - 11:00 2.67 DRILL P PROD1 Tag up at surface, lay down MHA, read MWD tool.
11:00 - 11:30 0.50 DRILL P PROD1 Safety meeting prior to running liner.
11:30 - 16:30 5.00 DRILL P PROD1 Pickup 2-7/8" x 3-3/16" liner. Centralized as per proceedure.
Slick on first 2 joints, 1 in line turbolizer centralizer per joint on
2 7/8" STL liner. No centralizers on 3 3/16" TC11 liner.
16:30 - 17:15 0.75 DRILL P PROD1 Cut 30' of coil make up CTC, PT to 3500 psi, Pull test to
35klbs. Make up MHA.
17:15 - 18:55 1.67 DRILL P PROD1 RIH with liner BHA. Check first flag at 8900' MD (6600' EOP +
2299.9' BHA). Found at 8886.5'. Make a +14' correction.
Check weight at shoe. Up weight=34klbs, down wt=20klbs.
18:55 - 19:05 0.17 DRILL P PROD1 Tag btm at corr depth. PUH 38.2K. Recip 35' twice. Load 5/8
"steel ball
:19:05 - 19:40 0.58 DRILL P PROD1 Circ ball over gooseneck and let it fall. Sheared ball seat at
4300 psi. Release from liner 28k
19:40 - 21:00 1.33 CASE P PROD1 Start displacement to KCI water. RU DS cementers.
Safety mtg re: cmt
21:00 - 21:20 0.33 CASE P PROD1 End displacement. PT DS @ 3500 psi
21:20 - 21:30 0.17 CASE P PROD1 DS load CT w/20 bbls 15.8 ppg G cement w/Latex 2.4/2440
21:30 - 22:25 0.92 CASE P PROD1 Load Baker wiper dart (and check). Displace w/2% KCI
2.4/1060
Dart latched at 59.5 bbls 2.5/2530. Dispalce to latch collar at
73.4 bbls. Had 18.7 bbls returned. Unsting, chk floats
22:25 - 23:35 1.17 CASE P PROD1 POOH
23:35 - 23:50 0.25 CASE P PROD1 LD Baker CTLRT
23:50 - 00:00 0.17 CASE P PROD1 MU 2.25" mill, 2.125" motor, MHA (will do ¢leanout run while
wo SWS for logs)
4/26/2001 00:00 - 01:00 1.00 CASE P PROD1 RIH w/36 stds CSH workstring
,,
Printed: 7/30/2001 4:00:04 PM
BP AMOCO Page 4 of 6
Operations Summary Report
Legal Well Name: S-08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 7/23/2001
Contractor Name: NABORS Rig Release: 7/23/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
4/2612001 01:00 - 03:00 2.00 CASE P PROD1 RIH w/CT clean to PBD @ 10570' CTD. Recovered 4 bbls of
10 ppg dirty water from TOL
03:00 - 04:50 1.83 CASE P PROD1 POOH w/CT
04:50 - 06:10 1.33 CASE P PROD1 Shear circ sub. Standback CSH workstring (wet)
06:10 - 06:30 0.33 CASE P PROD1 Crew XO, safety mtg
06:30 - 08:45 2.25 CASE P PROD1 Fin standback workstring
08:45 - 09:00 0.25 CASE P PROD1 Safety meeting prior to rigging up Schlumberger memory tools.
09:00 - 10:00 1.00 CASE P PROD1 Pick up SWS memory logging tools for GR-CCL-Temp. RIH
with 1-1/4" CSH work string.
10:00 - 10:30 0.50 CASE P PROD1 Make up Dowell BHA to top of CSH. Make up injector.
10:30 - 11:40 1.17 CASE P PROD1 Set depth to 2272', RIH with coil.
11:40 - 11:45 0.08 CASE P PROD1 Stop at 8000' CTM, flag pipe. Flag will be at 5727' EOP non
corrected to log depth.
11:45 - 12:30 0.75 CASE P PROD1 Start down log at 60 fpm. Pumps are down.
12:30 - 13:15 0.75 CASE P PROD1 Tag 10571' uncorrected, POH.
13:15 - 13:40 0.42 CASE P PROD1 Back up to 8000', Kick on pumps, RIH to lay in high vis perf pill.
13:40 - 15:40 2.00 CASE P PROD1 PUll laying in high vis pill.
15:40 - 17:00 1.33 CASE P PROD1 Tag up at top of CS hydrill pipe. Stand back injector, stand
back CSH.
17:00 - 17:45 0.75 CASE P PROD1 At surface with SWS memory logging tool. Lay down tool.
Stand by to ensure we have good data. RU to perform liner
PT. Dowell Lab reports UCA of sample from our cement job is
in excess of 3300 psi compressive strength. Bring WHP up to
2000 psi.
17:45 - 18:30 0.75 CASE P PROD1 PT wellbore to 2050 psi. In 15 minutes bled to 1897 psi. In 30
minutes bled to 1801 psi. Load perf guns into pipe shed.
18:30 - 18:45 0.25 CASE P PROD1 Safety mtg re: perf guns
Good log data. TOL is at 8352', PBD @ 10586'
18:45 - 19:45 1.00 CASE P PROD1 MU perfguns
19:45 - 20:45 1.00 CASE P PROD1 MU 29 stds CSH
20:45 - 22:15 1.50 CASE P PROD1 RIH w/CT
22:15 - 22:30 0.25 CASE P PROD1 Tag at 10573' CTD. Corr to 10586'. PUH to set depth. Pump
7 bbls 120k LSRV FIo Pro to CT. Load 5/8" steel ball.
22:30 - 23:00 0.50 CASE P PROD1 Displace ball to firing head with 2% KCI. Guns fired at 3300 psi
diff. Lost 0.5 bbl
23:00 - 00:00 1.00 P PROD1 POOH filling from BS
4/27/2001 00:00 - 00:30 0.50 CASE P PROD1 Finish POOH w/CT
00:30 - 02:00 1.50 CASE P PROD1 Standback CSH workstring
02:00 - 02:15 0.25 CASE P PROD1 Safety mtg re: perfguns
02:15 - 04:30 2.25 CASE P PROD1 POOH LD perf guns-all shots fired
Perforated 10125-180', 10200-240', 10260-295', 10315-360',
10380-495', 10515-570' w/2" Power Jet guns @ 4 spf
Kick drill-stab safety jt on spent gun, set top rams and SI well in
acceptable time. Discuss (10). Load out guns
04:30 - 05:30 1.00 CASE P PROD1 RIH w/nozzle to 1500' and FP wi MeOH. SI swab
05:30 - 07:00 1.50 RIGD P POST PT DS N2 @ 3500 psi. Displace CT to N2. Bleed off WHP
07:00 - 08:30 1.50 RIGD P POST ND BOP stack, NU tree cap and PT. Moving outside eq.,
preparing to move.
08:30 - 11:00 2.50 RIGD P POST Rig release at 0830 hrs 4/27/01. Move rig off well at 10:00.
Begin move to G-29 at 11:00.
11:00 - 0.00 RIGD P POST Move to G-29.
7/20/2001 06:00 - 17:00 11.00 RIGU P PRE Accept Nabors 3S at 1200 hrs 7-20-2001. Start move to S-08B.
Move delayed due to well site prep at S-08B.
Printed: 7/30/2001 4:00:04 PM
BP AMOCO Page 5 of 6
Operations Summary Report
Legal Well Name: S-08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 7/23/2001
Contractor Name: NABORS Rig Release: 7/23/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
7/20/2001 17:00 - 22:00 5.00 RIGU P PRE Nipple up BOP stack. Recieved a call from John Crisp of the
AOGCC notifying that we could procede with the BOP test
without a state witness.
22:00 - 00:00 2.00 RIGU P PRE Perform full body test on BOP and install 2-way check.
7/21/2001 00:00 - 07:00 7.00 BOPSUF.P COMP Continue with and finish testing BOPE.
07:00 - 07:30 0.50 BOPSUF.P COMP Function test H2S detector system. OK
07:30 - 08:30 1.00 PERF P COMP Pull two-way check.
08:30 - 09:30 1.00 PERF P COMP P/U injector M/U CTC pull test to 25k# PT to 4000 psi.
09:30 - 10:30 1.00 PERF P COMP TIH to displace freeze protection. No returns while TIH to
3000'. Stop and bring pump rate up to 3.2 bpm establish
returns 3.2 / 2.0. Displace 35 bbls from wellbore.
10:30 - 11:30 1.00 PERF N DPRB COMP TOH tag up wait 15 rain without pumps. Bring pump online well
took 12 bbls before established returns. Well drinking 40+
bbls/hr. Shut master valve.
11:30 - 13:30 2.00 PERF N DPRB COMP (Spot 2-400 bbl upright tanks wait on 600 bbl 2% KCL)
13:30 - 14:15 0.75 PERF N DPRB COMP Opened master valve and filled annulus, took 23 bbls to fill
after +/- 2 hrs. Set back injector.
14:15 - 18:00 3.75 PERF N DPRB COMP Keeping hole full, back to 40 bbl/hr. Observing well. Change in
plans: rather than P/U 1 1/4" tbg with fluid losses as high as
they are, arranging to bullhead FIo-Pro and spot on top of perfs
at 10125'. Wait on FIo-Pro.
18:00 - 18:30 0.50 PERF N DPRB COMP Crew change PJSM.
18:30 - 20:10 1.67 PERF N DPRB COMP Bullhead 70 bbls FIo-Pro mud followed by 68 bbls 2% KCL.
This places mud at the top of open perfs at 10125'.
20:10 - 21:00 0.83 PERF N DPRB COMP Circulate over top of hole~ Losses down to 5 bbl/hr. Hold PJSM
on p/u 1 1/4" tbg and well control.
21:00-23:20 2.33 PERF P COMP P/U BHA#9 (1818.4')
23:20 - 00:00 0.67 PERF P COMP TIH with 2.125" drifts.
7/22/2001 00:00 - 02:15 2.25 PERF P COMP RIH with 2.125" drifts. Stopped at 8352' (top of liner). Unable
to work past.
02:15 - 05:30 3.25 PERF P COMP TOH stand back 1 1/4" tbg.
05:30 - 06:00 0.50 PERF P COMP L/D Haliburton drifts. P/U actual 10' used guns with more
rounded bullnose end.
06:00 - 06:35 0.58 PERF P ;COMP Crew change PJSM running 1 1/4" tbg and BOP drill. Hole
taking +/- 12 bbl/hr.
06:35 - 07:35 1.00 PERF P COMP TIH with BHA #10 (1818.75')
07:35 - 07:55 0.33 PERF P COMP P/U and stab on injector
07:55 - 10:30 2.58 PERF P COMP TIH to 10150' no problems at liner top.
10:30 - 14:00 3.50 PERF P COMP TOH laying in 1:1 50 bbls FIo-Pro. Stand back tbg.
14:00 - 14:15 0.25 PERF P COMP PJSM p/u logging tools.
14:15 - 15:05 0.83 PERF P COMP P/U BHA #11 (233.65') p/u injector and stab on well.
15:05 - 17:00 1.92 PERF P COMP TIH w/logging tools.
17:00 - 18:00 1.00 PERF P COMP Log CLL/Gr from 8050' to 8500' and back.
18:00 - 19:30 1.50 PERF P COMP TOH (flag pipe at 8150') L/D logging tools. (Hole taking +/-
4bph)
19:30 - 19:50 0.33 PERF P COMP Prep floor to p/u perf guns.
19:50 - 20:10 0.33 PERF P COMP PJSM on picking up perf guns and job assignments.
20:10 - 23:30 3.33 PERF P COMP P/U BHA #12 (1871.32') (556' of 2" HSD 4spf Power Jet guns)
23:30 - 00:00 0.50 PERF P COMP TIH
!7/23/2001 00:00 - 00:45 0.75 PERF P COMP Finish TIH to 10125' on depth corrected to flag -9'.
00:45 - 01:35 0.83 PERF P COMP Drop and pump .625" ball. With ball on seat guns fired at 3000
psi. Good pressure drop and loss of about 1/2 bbl. Perforated
w/2" guns 4 spf P J2006 HMX Charge 6.5 gm .20" entrance
Printed: 7/30/2001 4:00:04 PM
BP AMOCO Page 6 of 6
Operations Summary Report
Legal Well Name: S-08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 7/23/2001
Contractor Name: NABORS Rig Release: 7/23/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
7/23/2001 00:45 - 01:35 0.83 PERF P COMP 18.6" penetration From: 9570' - 9800' & 9870' - 10125'
01:35 - 03:15 1.67 PERF P COMP TOH. Tag up set back injector.
03:15 - 07:30 4.25 PERF P COMP L/D 1 1/4" tbg and perf guns all guns fired.
07:30 - 09:30 2.00 PERF P COMP RIH w/remaining 16jts 1-1/4" tbg and L/D same.
09:30- 10:00 0.50 PERF P COMP P/U injector.
10:00 - 11:00 1.00 PERF P COMP RIH to 2000'. Freeze protect well w/35 bbl crude to surface.
Cleanout stack.
11:00 - 12:00 1.00 PERF P COMP Set BPV.
12:00 - 17:45 5.75 DEMOB P COMP Displace fluids in ROC and e-line coil with N2. (ROC off
location at 1430 hrs enroute to Deadhorse for maintenance)
17:45 - 19:45 2.00 DEMOB P COMP Rig down DS #4. Clean mud tanks.
19:45 - 21:00 1.25 DEMOB P COMP N/D BOPE. Install tree cap and test to 3000 psi.
DS #4 to Deadhorse for maintenance.
Nabors 3S released at 2100 hrs 7-23-2001
Printed: 7/30/2001 4:00:04 PM
W LL LOG
,,. TRANSMITTAL
ProActive Diagnostic Services, Inc.
To~
State of Alaska A~
333 W. 7~Street
Suite # 700
Anchorage, Alaska 99501
RE' Distribution - Final Print[s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of'
Joey Burton / Jerry Morgan
ProActive Diagnostic Services, Inc.
P. O. Box 1369
Stafford, TX 77497
BP Exploration (Alaska}, Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 99508
LOG DIGITAL MYLAR / BLUE LINE REPORT
WELL DATE TYPE OR SEPIA PRINT[SI OR
CD-ROM FILM COLOR
Open Hole 1 I 1
Res. Eval. CH. I 1
,,
Mech. CH 1
~,~1- 052. I
Caliper Survey
Signed'
RECEIVED
Print Name:
JUN 2 5 2001
ProActive Diagnostic Services, Inc., 310 K Street Suite 200,. Anchorage, AK 99501
Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage~memorylog.com Website: .www.memorvlog.com
K~ STATE OF ALASKA {
ALAS OIL AND GAS CONSERVATION COMIv~,SSION
WELL COMPLETION OR REOOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 201-052
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20778-02
4. Location of well at surface ~--'[~~~ 9. Unit or Lease Name
1640' SNL, 1525' EWL, SEC. 35, T12N, R12E, UM ? ~:?.i--'_,'~:m.-",.~ ':" ~¥~fl.~:~., Prudhoe Bay Unit
At top of produ,,ctive interval ~ ...... .~ ."~:.: ''-,:~'. i ~ ~ Il'
At total depth ii ..z_:_-:._.?_£_ i 10. Well Number
4666' SNL, 22' EWL, SEC. 35, T12N, R12E, UM I \,'L:r~;.~'!) ! ~ S-08B
i --- ,'~-',~ ~ 11 Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease!~~h:~hd Serial No. '
Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 67.63' ADL 028257
12. Date Spudded4/22/2001 113' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband'4/25/2001 4/27/2001 115' Water depth' if °ffsh°reN/A MSL 116' N°' °f C°mpleti°nsOne
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 120. Depth where SSSV set1 21. Thickness of Permafrost
10650 8818 FTI 10587 8792 FTI [] Yes [] NoI (Nipple) 2081' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, RES, CCL, Temp
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" X 30" Insulated Conductor Surface 110' 36" 8 cu yds concrete
13-3/8" 72# L-80 Surface 2672' 17-1/2" 3720 cu ft Arcticset II
9-5/8" 47# L-80 Surface 8892' 12-1/4" 1218 cu ft Class 'G', 130 cu ft Arcticset
7" 26# L-80 8413' 8960' 8-1/2" ¢20 cuft Class 'G'
5,, 15# 13Cr80 8315' 8960' 8-1/2" _~00 cu ft Class 'G' iScab Liner, 1991/ ,
3-3/16,,x 2-7/8,, 6.2# / 6.4# L-80 8352' 10650' 3-3/4" ' .....
24. Perforations .open to, Production (MD+TVD of Top and 25. ' ' TUBING RECORD
Bottom and ~nterva~, size and number) ,
..... SiZE ' 'DEPTH'SET (MD) .... PACKER'"SET (MI:))"
2" Gun Diameter, 4 spf 4-1/2"i "12.6#, 13Cr80 8314' 8231' '
MD TVD MD TVD
10125' - 10180' 8731' - 8735'
10200' - 10240' 8737' - 8740' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
10260' - 10295' 8742' - 8743' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10315' - 10360' 8744' - 8744'
10380' - 10495' 8745' - 8762' Freeze Protect with MeOH
10515' - 10570' 8768' - 8785'
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
May 6, 2001 Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL'BBL GAS'MCF WATER'BBL CHOKE SIZE ~ GAs-OIL RATIO
5/22/2001 4 TEST PERIOD 23 489 396 95.77I 21,410
Flow Tubing Casing Pressure CALCULATED OIL'BBL GAS'MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HouR RATE 25.8
,,,,
28. CORE DATA
Briefdes~ripti~n~f~ith~~~gy~p~r~sity~fra~tures~~pp~~r~e~tdipsandpresen~e~f~i~~g~s~r~~ter~ Submit core chips. RECEIVED
JUN 1 3 Z001
Alaska Oil & Gas Cons. Commission
Anchorage
Form 10-407 Rev. 07-01-80
ORIGINAL
Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered
Depth Depth and gravity, GOR, and time of each phase.
Shublik 'A' 8972' 8650'
Sadlerochit 9062' 8727'
31. LiSt of Attachments: Summary of Daily Drilling Reports, SurveYs ......
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble..~~.,~ Title TechnicalAssistant Date ~)~;~"l~)-{~)I
S-08B 201-052
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. /Approval No.
INSTRUCTIONS
GENERAL; This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5; Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
O lGIIIAL
BP AMOCO Page 1 of 4
Operations Summary Report
Legal Well Name: S-08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 4/27/2001
Contractor Name: DOWELL SCHLUMBERGER Rig Release: 4/27/2001 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Sub Phase Description of Operations
Date From-To Hours Task Code
4/20/2001 00:00 - 14:00 14.00 MOB PRE Derrick up move from MPU F-73 to PBU S-08A.
14:00 - 15:00 1.00 MOB PRE Spot over well. Level rig. Establish phone & network.
15:00 - 16:30 1.50 BOPSUF DECOMP Accept rig @ 1500 hrs 4/20/01. Remove tree cap. NU BOPE.
16:30 - 18:00 1.50 BOPSUF DECOMP Wait on DSM berm crew to spot & berm cuttings tank.
18:00 - 19:30 1.50 BOPSUF DECOMP Finish berm job
19:30 - 20:00 0.50 BOPSUF DECOMP Fill pits w/KCI water
20:00 - 00:00 4.00 BOPSUF DECOMP Initial BOPE test. AOGCC waived witness
4/21/2001 00:00 - 01:00 1.00 BOPSUF DECOMP Fin test BOPE
01:00 - 03:00 2.00 BOPSUF DECOMP RU injector. Fill CT w/KCl water. Pump wiper dart(s). First dart hit at
60.2 bbls. Pump a second volume looking for second dart-none. Bleed
IA from 1560 to 600 psi (gas)
03:00 - 03:30 0.50 BOPSUF DECOMP PT inner reel valve @ 4000. Check well for press, 165 psi. Bleed to
zero
03:30 - 04:00 0.50 STWHIP WEXIT Install Baker CTC. PT 35k, 3500 psi. Change packoff while WHP
bleeds crude to tank
04:00 - 04:45 0.75 STWHIP WEXIT MU milling BH^
04:45 - 05:25 0.67 S'I'WHIP WEXIT RIH w/milling BHA #1. Pump at rain taking gassy crude returns to slop
tank thru buster
05:25 - 05:45 0.33 STWHIP WEXIT Park at 3300' and pressure test CIBP to 850 psi w/16 bbls. Lots of gas
compression. Bled to 700 psi in 3 min. Bleed off press. IA remained
constant at 970 psi
05:45 - 06:15 0.50 S-I-WHIP WEXIT RIH holding 250 psi BP while circ at 0.8 bpm thru buster
06:15 - 10:00 3.75 STWHIP WAST WEXIT Burp crude out top of gas buster onto roof. Clean up same. Continue
to circulate while waiting on additional flow back equipment.
10:00 - 12:30 2.50 STWHIP WEXIT RU flow back tank. Test hardline to 3000 psi.
12:30 - 13:00 0.50 STWHIP WEXIT Hold PJSM regarding bleed down procedures.
13:00 - 14:00 1.00 S'I'WHIP WEXIT R!H. Bleed gas to tiger tank. ISITP 1100 psi. Bleed to zero. Continue
displacing well to 1% kcl water.
14:00 - 16:00 2.00 S'I'WHIP WEXIT Tag whipstock at 8960'. 37k# up, 25K# dn wt. 2700psi@2.8. Stacking
weight, up to 7K. Up to 500 psi mtr work. Unable to make progress.
16:00 - 17:15 1.25 S'I'WHIP WEXIT POOH to remove string reamer and check window mill.
17:15 - 17:45 0.50 STWHIP WEXIT At surface. Offwell. Standback BHA. Remove string reamer & DSM.
Run window master 6 bladed MM mill.
17:45 - 19:20 1.58 STWHIP WEXIT RIH with window milling assembly.
19:20 - 20:10 0.83 STWHIP WEXIT Corr -4.4' at flag to put mill at 8960' 2.5/2300. Work to get started
milling-blades hanging up on top of WS. Corr +2' after numerous stalls
20:10 - 21:40 1.50 STWHIP WEXIT Begin steady milling
21:40 - 00:00 2.33 STWHIP WEXIT At 8965.5' (7" casing contact) and pump a sweep 2.5/2400. Continue
milling
4/22/2001 00:00 - 00:20 0.33 STWHIP WEXIT Stall and overpull at 8969.8'. Wiper to EOT while pump sweep
00:20 - 00:35 0.25 STWHIP WEXIT Attempt to resume milling and begin losing ground. Lost hole to 8967.4'
00:35 - 02:00 1.42 STWHIP WEXIT POOH to check milling assy. Most of window should be cut (should be
ready to fully exit 7" liner)
02:00 - 02:50 0.83 STWHIP WMIL WEXIT Left two of six Window Master mill blades (one chunk of 3"x3"x2") in
hole. MU used 3.80" window mill and 3.80" SR
02:50 - 04:25 1.58 STWHIP WEXIT RIH w/BHA #3 to mill up junk and dress window
04:25 - 08:00 3.58 STWHIP WEXIT Tag WS and corr to 8960'. RIH 2.6/2040 clean to stall at 8965.0'
Mill to 8967.6' and had overpull. Motor work dropped off at 8969'.
Appear to be drilling new/open hole.
08:00 - 10:30 2.50 ST'WHIP WEXIT Mill ahead in Shublik to 8982'. '~,
10:30 - 13:00 2.50 S'I'WHIP WEXIT Dress window. Top window @ 8960', btm at 8970'. Smooth.
13:00 - 13:45 0.75 STWHIP WEXIT Pump 22 bbl bio sweep. Paint EOP flag at 8800'.
13:45 - 15:00 1.25 S'I'WHIP WEXIT Circ out of hole to PU build assy.
Printed: 5/1/2001 10:32:02 AM
BP AMOCO Page 2 of 4
Operations Summary Report
Legal Well Name: S-08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 4/27/2001
Contractor Name: DOWELL SCHLUMBERGER Rig Release: 4/27/2001 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Sub
Date From -To Hours Task Code Phase Description of Operations
4/22/2001 15:00 - 15:30 0.50 STWHIP WEXlT LD window assembly. DSM & string reamer both gauge at 3.77-78".
15:30 - 16:15 0.75 DRILL PROD1 MU Build assembly. (BHA # 3). M-09 with 2.4 deg mfr.
16:15 - 18:00 1.75 DRILL PROD1 RIH. Shallow test mwd for pulses only. Continue in hole. Correct to
EOP flag at 8800'. Add 6' correction. Through window. Tag TD at
8983'.
18:00 - 19:00 1.00 DRILL PROD1 Circulate on btm while displacing to used rio-pro. Work on Sperry PC
and DD calcs
19:00 - 21:50 2.83 DRILL PROD1 Drill ahead in Shublik orienting as necessary for HS TF. Sperry having
trouble with PC's. 2.6/3700/13L
21:50 - 23:00 1.17 DRILL PROD1 Drill to 9045'. Log up to get on depth w/BHCS 2.1/2970
23:00 - 23:30 0.50 DRILL PROD1 Add 8.0' to CTD. RIH. Orient around
23:30 - 00:00 0.50' DRILL PROD1 Drilling 2.6/3700/7L 60-90'/hr from 9053'
4/23/2001 00:00 - 02:00 2.00i DRILL PROD1 Drill 60-180'/hr 2.4/3500/7R from 9084-9220'. Survey (20 min)
02:00 - 02:15 0.251 DRILL PROD1 Backream to window. Flag at 8800' EOP
02:15 - 03:40 1.421 DRILL PROD1 POOH for horizontal assy
03:40 - 06:00 2.33 DRILL PROD1 Change bit, motor. LD shock sub. Upload and add resistivity. MU
BHA
06:00 - 08:00 2.00 DRILL PROD1 RIH w/BHA #5. Correct to EOP flag @ 8800: subtract 1'. Continue in
hole.
08:00 - 09:00 1.00 DRILL PROD1 Log resistivity MADD pass up from TD to top of Zone 4.
09:00 - 10:00 1.00 DRILL PROD1 Log GR tie in from 9020' up to window. Add 4' correction. Establish tie
in point inside liner.
10:00 - 11:45 1.75 DRILL PROD1 Drill lateral from 9220'. 2.6/3500. TF:45R. 70-100 fph.
11:45 - 12:15 0.50 DRILL PROD1 Drill lateral from 9360'. 2.5/3600 TF:110R 100 fph. Mud wearing out.
Weight x-fer slowing ROP. New mud ready. No vac trucks available.
12:15- 13:15 1.00 DRILL PROD1 Short trip to window from 9400'. Hole very smooth.
13:15 - 19:15 6.00 DRILL PROD1 Drill lateral from 9400-9700'. 2.6/3700 TF: 55L 90 fph. Weight x-fer
becoming very poor. Wiper to window at 9550'. Still waiting on vac
trucks.
.19:15 - 19:45 0.50 DRILL PROD1 Wiper to window from 9700'
19:45 - 20:15 0.50 DRILL PROD1 Log up from 9000' to tie-in, add 4.0'
20:15 - 20:45 0.50 DRILL PROD1 RIH to corr TD @ 9703'
20:45 - 20:55 0.17 DRILL PROD1 Orient to left
20:55 - 21:45 0.83 DRILL PROD1 Drilling 2.6/2800/122L from 9703-9770' 40-80'/hr stacking bad, sli
overpulls
21:45 - 22:00 0.25 DRILL PROD1 Wiper to window
22:00 - 00:00 2.00 DRILL PROP PROD1 Park in liner at 8950'. Circulate and wait on mud (vac trucks
unavailable-now second on list). Current mud is too dirty to continue
8.8 ppg/2.4% drilled solids
4/24/2001 00:00 - 05:00 5.00 DRILL PROP PROD1 Continue circ at 8950' while wait on new mud
05:00 - 05:30 0.50 DRILL PROD1 . RIH. Begin displacing to fresh mud
05:30 - 07:45 2.25 DRILL PROD1 'Drilling from 9770' 60-90'/hr 2.7/3500/148L
07:45 - 09:15 1.50 DRILL PROD1 Drilling from 9920' 80-100'/hr 2.7/3500/45L
09:15 - 10:15 1.00 DRILL PROD1 Short trip from 10000'. A little tight at 9650'. Otherwise smooth.
10:15 - 12:15 2.00 DRILL PROD1 Drilling from 10000' 80-100'/hr 2.7/3500/90L
12:15 - 13:15 1.00 DRILL PROD1 Short trip from 10150' (8664' TVD high point). Hole smooth.
13:15 - 14:45 1.50 DRILL PROD1 Drilling from 10150' 80-90'/hr 2.7/3500/45L
14:45 - 15:30 0.75 DRILL PROD1 Drilling from 10250' 80-90'/hr 2.7/3600/65R
15:30- 16:40 1.17 DRILL PROD1 Short trip from 10301' to the window. Hole smooth.
16:40 - 20:15 3.58 DRILL PROD1 Back on bottom. Wiper trip smooth, no problems RIH. Resume drilling.
Drilling from 10300' 2.7 bpm/3700 psi 145L
20:15 - 20:50 0.58 DRILL PROD1 Wiper to window from 10456'
20:50 - 21:10 0.33 DRILL PROD1 Log tie-in, add 6.0'
Printed: 5/1/2001 10:32:02AM
BP AMOCO Page 3 of 4
Operations Summary Report
Legal Well Name: S-08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 4/27/2001
Contractor Name: DOWELL SCHLUMBERGER Rig Release: 4/27/2001 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Date From-To Hours Task Sub
Code Phase Description of Operations
....
4/24/2001 21:10 - 22:00 0.83 DRILL PROD1 RIH to TD. Losing 4 bph
22:00 - 22:30 0.50 DRILL PROD1 Toggle MWD to drill mode. DS engr experiment w/levelwind. Orient to
around to Iow side to finish hole. Geo's extended the horizontal before
the drop section. Added approx 300' to TD-still in polygon
22:30 - 23:15 0.75 DRILL PROD1 Orient to Iow side. Orientor not working properly
23:15 - 23:30 0.25 DRILL PROD1 Drill to 10474' (8690' TVD) 2.5/3220/145L
23:30 - 00:00 0.50 DRILL PROD1 Orient around to Iow side
4/25/2001 00:00 - 00:40 0.67 DRILL PROD1 Continue working to get orientor to point Iow side
00:40 - 02:05 1.42 DRILL PROD1 Resume drilling from 10474' 2.5/3350/148L (close enough)
02:05 - 02:55 0.83 DRILL PROD1 Wiper to window from 10586'. Sli overpull at 9550'
02:55 - 03:05 0.17 DRILL PROD1 Log tie-in, add 1.0'
03:05 - 04:05 1.00 DRILL PROD1 RIH to TD
04:05 - 05:00 0.92 DRILL PROD1 Drilling from 10586' 2.4/3200/134L
05:00 - 06:30 1.50 DRILL PROD1 TD at 10650' (8751' TVD). Begin MAD pass up at 1200'/hr
06:30 - 06:45 0.25 DRILL PROD1 Tie-in at 8990'. Add 2.0'
06:45 - 08:20 1.58 DRILL PROD1 POOH. Flag pipe at 8350' EOP, and 6600' EOP.
08:20 - 11:00 2.67 DRILL PROD1 Tag up at surface, lay down MHA, read MWD tool.
11:00 - 11:30 0.50 DRILL PROD1 Safety meeting prior to running liner.
11:30 - 16:30 5.00 DRILL PROD1 Pickup 2-7/8" x 3-3/16" liner. Centralized as per proceedure. Slick on
first 2 joints, 1 in line turbolizer centralizer per joint on 2 7/8" STL liner.
No centralizers on 3 3/16" TC11 liner.
16:30 - 17:15 0.75 DRILL PROD1 Cut 30' of coil make up CTC, PT to 3500 psi, Pull test to 35klbs. Make
up MHA.
17:15 - 18:55 1.67 DRILL PROD1 RIH with liner BHA. Check first flag at 8900' MD (6600' EOP + 2299.9'
BHA). Found at 8886.5'. Make a +14' correction. Check weight at
shoe. Up weight=34klbs, down wt=20klbs.
18:55 - 19:05 0.17 DRILL PROD1 Tag btm at corr depth. PUH 38.2K. Recip 35' twice. Load 5/8" steel
ball
19:05 - 19:40 0.58 DRILL PROD1 Circ ball over gooseneck and let it fall. Sheared ball seat at 4300 psi.
Release from liner 28k
19:40 - 21:00 1.33 CASE PROD1 Start displacement to KCl water. RU DS cementers.
Safety mtg re: cmt
21:00 - 21:20 0.33 CASE , PROD1 End displacement. PT DS @ 3500 psi
21:20 - 21:30 0.17 CASE PROD1 DS load CT w/20 bbls 15.8 ppg G cement w/Latex 2.4/2440
21:30 - 22:25 0.92 CASE PROD1 Load Baker wiper dart (and check). Displace w/2% KCl 2.4/1060
Dart latched at 59.5 bbls 2.5/2530. Dispalce to latch collar at 73.4 bbls.
Had 18.7 bbls returned. Unsting, chk floats
22:25 - 23:35 1.17 CASE PROD1 POOH
23:35 - 23:50 0.25 CASE PROD1 LD Baker CTLRT
23:50 - 00:00 0.17 CASE PROD1 MU 2.25" mill, 2.125" motor, MHA (will do cleanout run while wo SWS
for logs)
4/26/2001 00:00 - 01:00 1.00 CASE PROD1 RIH w/36 stds CSH workstring
01:00 - 03:00 2.00 CASE PROD1 RIH w/CT clean to PBD @ 10570' CTD. Recovered 4 bbls of 10 ppg
dirty water from TOL
03:00 - 04:50 1.83 CASE PROD1 POOH w/CT
04:50 - 06:10 1.33 CASE PROD1 Shear circ sub. Standback CSH workstring (wet)
06:10 - 06:30 0.33 CASE PROD1 'Crew XO, safety mtg
06:30 - 08:45 2.25 CASE PROD1 Fin standback workstring
08:45 - 09:00 0.25 CASE PROD1 Safety meeting prior to rigging up Schlumberger memory tools.
09:00 - 10:00 1.00 CASE PROD1 Pick up SWS memory logging tools for GR-CCL-Temp. RIH with
~ 1-1/4" CSH work string.
10:00 - 10:30 0.50 CASE PROD1 Make up Dowell BHA to top of CSH. Make up injector.
10:30 - 11:40 1.17 CASE PROD1 Set depth to 2272', RIH with coil.
Printed: 5/1/2001 10:32:02 AM
BP AMOCO Page 4 of 4
Operations Summary Report
Legal Well Name: So08
Common Well Name: S-08B Spud Date: 4/21/2001
Event Name: REENTER+COMPLETE Start: 4/20/2001 End: 4/27/2001
Contractor Name: DOWELL SCHLUMBERGER Rig Release: 4/27/2001 Group: COIL
Rig Name: NORDIC 1 Rig Number:
Sub Phase Description of Operations
Date From-To Hours Task Code
4/26/2001 11:40 - 11:45 0.08 CASE PROD1 Stop at 8000' CTM, flag pipe. Flag will be at 5727' EOP non corrected
to log depth.
11:45 - 12:30 0.75 CASE PROD1 Start down log at 60 fpm. Pumps are down.
112:30- 13:15 0.75 CASE PROD1 Tag 10571' uncorrected, POH.
,13:15 - 13:40 0.42 CASE PROD1 Back up to 8000', Kick on pumps, RIH to lay in high vis perf pill.
13:40 - 15:40 2.00 CASE PROD1 PUH laying in high vis pill.
15:40 - 17:00 1.33 CASE PROD1 Tag up at top of CS hydrill pipe. Stand back injector, stand back CSH.
17:00 - 17:45 0.75 CASE PROD1 At surface with SWS memory logging tool. Lay down tool. Stand by to
ensure we have good data. RU to perform liner PT. Dowell Lab reports
UCA of sample from our cement job is in excess of 3300 psi
compressive strength. Bring WHP up to 2000 psi.
17:45 - 18:30 0.75 CASE PROD1 PT wellbore to 2050 psi. In 15 minutes bled to 1897 psi. In 30 minutes
bled to 1801 psi. Load perf guns into pipe shed.
18:30- 18:45 0.25 CASE PROD1 Safety mtg re: perf guns
Good log data. TOL is at 8352', PBD @ 10586'
18:45 - 19:45 1.00 CASE PROD1 MU perf guns
19:45 - 20:45 1.00 CASE PROD1 MU 29 stds CSH
20:45 - 22:15 1.50 CASE PROD1 RIH w/CT
22:15 - 22:30 0.25 CASE PROD1 Tag at 10573' CTD. Corr to 10586'. PUH to set depth. Pump 7 bbls
120k LSRV FIo Pro to CT. Load 5/8" steel ball.
22:30 - 23:00 0.50 CASE PROD1 Displace ball to firing head with 2% KCI. Guns fired at 3300 psi diff.
Lost 0.5 bbl
23:00 - 00:00 1.00 PROD1 POOH filling from BS
4/27/2001 00:00 - 00:30 0.50 CASE PROD1 Finish POOH w/CT
00:30 - 02:00 1.50 CASE PROD1 Standback CSH workstring
02:00 - 02:15 0.25 CASE PROD1 Safety mtg re: perf guns
02:15 - 04:30 2.25 CASE PROD1 POOH LD perf guns-all shots fired
Perforated 10125-180', 10200-240', 10260-295', 10315-360',
10380-495', 10515-570' w/2" Power Jet guns @ 4 spf
Kick drill-stab safety jt on spent gun, set top rams and SI well in
acceptable time. Discuss (10). Load out guns
04:30 - 05:30 1.00 CASE PROD1 RIH w/nozzle to 1500' and FP w/MeOH. SI swab
05:30 - 07:00 1.50 RIGD POST PT DS N2 @ 3500 psi. Displace CT to N2. Bleed off WHP
07:00 - 08:30 1.50 RIGD POST ND BOP stack, NU tree cap and PT. Moving outside eq., preparing to
move.
08:30 - 11:00 2.50 RIGD POST Rig release at 0830 hrs 4/27/01. Move rig off well at 10:00. Begin
move to G-29 at 11:00.
11:00 - 0.00 RIGD POST Move to G-29.
=
Printed: 5/1/2001 10:32:02AM
22-May-01
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well S-08B Zo~-oS~
Dear Dear SidMadam:
Enclosed are two survey hard copies and 1 disk
REC'EtVED
PAY 2 5 2001
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
8,900.03' MD
8,960.00' MD
10,650.00' MD
(if applicable
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
DEFINiTiVE
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA S Pad, Slot S-08
S-08B
Job No. AKMWlO135, Surveyed: 22 April, 200~
SURVEY REPORT
22 May, 200~
Your Reft API500292077802
Surface Coordinates: 5979855.00 N, 6~9687.00 E (70° 2~' ~2.8969" N, ~49° 0~'4~.~550" VI/)
Kelly Bushing: 67.63ft above Mean Sea Level
BRtLLING SERVICES
Survey Ref: svy'i08'16
A Halliburton Company
Sperry-Sun Drilling Services
Survey Report for S-08B
Your Ref: API500292077802
Job No. AKMW~O~35, Surveyed: 22 April, 200~
North Slope Alaska
Measured
Depth
(ft)
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
8900.03 18.900 221.317 8513.83 8581.46
8925.00 18.850 221.590 8537.46 8605.09
8950.00 18.790 221.850 8561.12 8628.75
8960.00 18.770 221.950 8570.59 8638.22
8993.47 24.780 219.950 8601.65 8669.28
9038.92 35.330 216.820 8640.94 8708.57
9071.62 44.910 214.630 8665.92 8733.55
9118.42 59.060 220.600 8694.68 8762.31
9178.05 77.430 219.020 8716.69 8784.32
9196.27 83.030 219.480 8719.78 8787.41
9232.06 91.810 217.550 8721.39 8789.02
9261.96 93.130 221.430 8720.10 8787.73
9290.08 93.570 224.600 8718.46 8786.09
9325.30 93.570 228.830 8716.27 8783.90
9353.56 92.950 233.410 8714.66 8782.29
9390.06 90.480 235.350 8713.56 8781.19
9426.78 92.330 231.470 8712.66 8780.29
9467.08 93.920 226.360 8710.47 8778.10
9501.36 96.650 224.430 8707.31 8774.94
9545.38 95.510 221.960 8702.65 8770.28
9575.68 94.360 215.440 8700.04 8767.67
9603.06 95.330 211.740 8697.72 8765.35
9627.78 97.270 216.670 8695.01 8762.64
9657.53 98.680 220.730 8690.88 8758.51
9692.23 99.380 224.070 8685.43 8753.06
9728.48 96.830 221.610 8680.32 8747.95
9768.61 95.680 217.380 8675.95 8743.58
9808.23 91.940 214.040 8673.31 8740.94
9862.16 88.710 208.500 8673.01 8740.64
9890.95 90.660 204.690 8673.17 8740.80
Local Coordinates Global Coordinates
.
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
1631.73 S 868.49W 5978209.60 N 618844.69 E
1637.79 S 873.83W 5978203.46 N 618839.44 E
1643.81S 879.20W 5978197.36 N ' 618834.17 E
1646.20 S 881.35W 5978194.93 N 618832.06 E
1655.59 S 889.46W 5978185.41 N 618824.10 E
1673.47 S 903.49W 5978167.31 N 618810.35 E
1690.58 S 915.75W 5978150.01N 618798.37 E
1719.57 S 938.33W 5978120.66 N 618776.26 E
1761.96 S 973.59W 5978077.71N 618741.68 E
1775.86 S 984.95W 5978063.63 N 618730.54 E
1803.81S 1007.19W 5978035.33 N 618708.75 E
1826.86 S 1026.18W 5978011.98 N 618690.13 E
1847.38 S 1045.33W 5977991.15 N 618671.31E
1871.48 S 1070.91W 5977966.65 N 618646.12 E
1889.18 S 1092.87W 5977948.60 N 618624.45 E
1910.43 S 1122.53W 5977926.88 N 618595.14 E
1932.30 S 1151.99W 5977904.54 N 618566.02 E
1958.74 S 1182.31W 5977877.62 N 618536.13 E
1982.70 S 1206.61W 5977853.27 N 618512.21E
2014.61S 1236.57W 5977820.89 N 618482.77 E
2038.16 S 1255.43W 5977797.05 N 618464.28 E
2060.88 S 1270.53W 5977774.09 N 618449.56 E
2081.20 S 1284.33W 5977753.55 N 618436.08 E
2104.18 S 1302.75W 5977730.27 N 618418.03 E
2129.49 S 1325.85W 5977704.60 N 618395.34 E
2155.80 S 1350.25W 5977677.90 N 618371.36 E
2186.58 S 1375.61W 5977646.73 N 618346.49 E
2218.67 S 1398.68W' 5977614.27 N 618323.95 E
2264.74 S 1426.65W 5977567.76 N 618296.71E
2290.48 S 1439.54W 5977541.82 N 618284.23 E
Dogleg
Rate
(o/10oft)
0.406
0.413
0.379
18.090
23.460
29.609
31.838
30.904
30.836
25.115
13.695
11.362
11.987
16.328
8.603
11.703
13.261
9.739
6.151
21.771
13.923
21.319
14.322
9.718
9.727
10.863
12.643
11.890
14.866
Alaska Drilling & Wells
PBU WOA S Pad
Vertical
Section Comment
1801.88 Tie On
MWD Magnetic
1809.95
1818.02
1821.24
1833.65
1856.34
1877.30
1914.00
1969.13
1987.07
2022.76
.2052.61
2080.66
2115.63
2143.39
2178.86
2214.69
2254.53
2288.55
2332.28
2362.43
2389.49
2413.88
2443.31
2477.57
2513.43
2553.30
2592.65
2645.79
2673.68
Window Point
22 May, 200~ - 9:35 Page 2 of 4 DrillQuest 2.00.08.005.
Sperry-Sun Drilling Services
Survey Report for S-08B
Your Ref: API500292077802
Job No. AKMWfOI35, Surveyed: 22 April, 200~
North Slope Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(fi) (ft) (fi) (ft)
9919.03 93.740 202.930 8672.09 8739.72 2316.14 S 1450.87W 5977515.98 N 618273.32 E
9948.43 93.390 200.110 8670.26 8737.89 2343.44 S 1461.63W 5977488.51N 618262.99 E
9982.23 93.920 197.470 8668.10 8735.73 2375.37 S 1472.49W 5977456,41N 618252.64 E
10013.03 93.410 192.820 8666.13 8733.76 2405.03 S 1480.52W 5977426.63 N 618245.09 E
10041.98 91.630 186.360 8664.86 8732.49 2433.53 S 1485.34W 5977398.05 N 618240.73 E
10072.03 91.910 186.410 8663.93 8731.56 2463.38 S 1488.68W 5977368.15 N 618237.87 E
10100.66 90.570 182.840 8663.31 8730.94 2491.91S 1490.98W 5977339.59 N 618236.02 E
10132.37 86.870 181.960 8664.02 8731.65 2523.57 S 1492.31W 5977307.91 N 618235.19 E
10169.43 85.460 179.670 8666.50 8734.13 2560.54 S 1492.84W 5977270.94 N 618235.26 E
10200.11 84.580 177.730 8669.16 8736.79 2591.10 S 1492.14W 5977240.40 N 618236.44 E
10242.27 85.730 172.270 8672.73 8740.36 2632.93 S 1488.48W 5977198.63 N 618240.77 E
10273.86 87.310 176.140 8674.64 8742.27 2664.29 S 1485.30W 5977167.32 N 618244.45 E
10306.36 88.630 179.670 8675.80 8743.43 2696.75 S 1484.11W 5977134.89 N 618246.16 E
10338.06 90.220 181.430 8676.11 8743.74 2728.44 S 1484.42W 5977103.19 N 618246.36 E
10370.53 87.580 184.780 8676.74 8744.37 2760.85 S 1486.18W 5977070.76 N 618245.12 E
10412.11 83.440 185.660 8679.99 8747.62 2802.12 S 1489.94W 5977029.43 N 618242.01E
10442.71 80.790 188.480 8684.19 8751.82 2832.20 S 1493.67W 5976999.30 N 618238.76 E
10476.53 77.800 187.420 8690.47 8758.10 2865.10 S 1498.27W 5976966.33 N 618234.69 E
10524.21 72.860 182.660 8702.55 8770.18 2911.02 S 1502.34W 5976920.35 N 618231.35 E
10569.52 68.460 179.840 8717.55 8785.18 2953.75 S 1503.29W 5976877.62 N 618231.09 E
10601.75 65.900 176.850 8730.06 8797.69 2983.43 S 1502.44W 5976847.94 N 618232.42 E
10625.15 64.140 173.850 8739.94 8807.57 3004.57 S 1500.72W 5976826.84 N 618234.47 E
10650.00 64.140 173.850 8750.78 8818.41 3026.81S 1498.33W 5976804.65 N 618237.22 E
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 26.532° (27-Apr-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well Reference and calculated along an Azimuth of 220.915° (True).
Dogleg
Rate
(°/lOOft)
12.631
9.647
7.951
15.157
23.124
0.947
13.316
11.993
7.245
6.922
13.189
13.211
11.589
7.482
13.134
10.178
12.582
9.362
14.161
11.347
11.670
13.842
0.001
Alaska Drilling & Wells
PBU WOA S Pad
Vertical
Section Comment
2700.50
2728.17
2759.42
2787.O9
2811.78
2836.52
2859.59
2884.39
2912.67
2935.31
2964.52
2986.14
3009.89
3034.04
3059.68
3093.34
3118.50
3146.38
3183.75
3216.65
3238.53
3253.38
3268.61
Projected Survey
22 May, 2001 - 9:35 Page 3 of 4 DriilQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for S-08B
Your Ref: API500292077802
Job No. AKMWlO135, Surveyed: 22 April, 200~
North Slope Alaska
Based upon Minimum Curvature type calculations, at a Measured Depth of 10650.00ft.,
The Bottom Hole Displacement is 3377.36ft., in the Direction of 206.336° (True).
Alaska Drilling & Wells
PBU WOA S Pad
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
Comment
8900.03 8581.46 1631.73 S 868.49 W Tie On
8960.00 8638.22 1646.20 S 881.35 W Window Point
10650.00 8818.41 3026.81 S 1498.33 W Projected Survey
Survey tool program for S-08B
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (fi) (fi)
0.00 0.00 8900.03 8581.46
8900.03 8581.46 10650.00 8818.41
Survey Tool Description
Good Gyro (S-08B)
MWD Magnetic (S-08B)
22 May, 200'i - 9:35 Page 4 of 4 DrillQuest 2.00.08.005
ALASKA OIL AND GAS
CONSERVATION CO SSION
Mary Endacott
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
/
/
/
/
/
/
TONY KNOWLES, GOVERNOR
333 W. 7TM AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re:
Prudhoe Bay Unit S-08B
BP Exploration (Alaska) Inc.
Permit No: 201-052
Sur Loc: 1640' SNL, 1525' EWL, SEC. 35, T12N, R12E, UM
Btmhole Loc. 4445' SNL, 80' EWL, SEC. 35, T12N, R12E, UM
Dear Ms. Endacott:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required.
permitting determinations .are made.
Information regarding a "safety joint" for running the 3-3/16" portion of the planned production liner has
been received from Mr. Ted Stagg. Providing such a "safety joint" equipped with a suitably sized lifting
sub and threaded crossover to mate with the 3-3/16" liner section should lessen the time required to install
the joint should a flow be observed while running the liner. However, be advised that the Commission
views the use of this joint as an interim measure pending the receipt of pipe rams capable of sealing on
this Size pipe. Not later than May 15, 2001, Alaska Drilling and Wells (BP Exploration Alaska) is
directed to provide the Commission with information regarding the availability/deliverability of rams
sized for 3-3/16" and other such sizes that you may plan to run.
BloWout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 036.. Sufficient
notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a
test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission
petroleum field inspector on the North Slope pager at 659-3607.
Commissioner
BY ORDER OF THE COMMISSION
DATED this / 0' ~ day of April, 2001
jjc/Enclosures
cc: Department offish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA ""~ H('t (.,
ALASK,~" iL AND GAS CONSERVATION COMI( ,SION
PERMIT TO DRILL
20 AAC 25.005
I [] Exploratory [] Stratigraphic Test [] Development Oil
la. Type of work B Drill [] Reddll lb. Type of well [] Service [] Development Gas [] Single Zone [] Multiple Zone
Re-Entry [] Deepen
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 67.63' AMSL Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028257
,
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1640' SNL, 1525' EWL, SEC. 35, T12N, R12E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
3307' SNL, 621' EWL, SEC. 35, T12N, R12E, UM S-08B Number 2S100302630-277
At total depth 9. Approximate spud date
4445' SNL, 80' EWL, SEC. 35, T12N, R12E, UM 04/05/01 Amount $200,000.00
12. Distance to nearest property line ~13. Distance to nearest well ~ 14. Number of acres in property 15. Proposed depth (MD and 'I-VD)
ADL 028258, 80' MDI No Close Approach ~ 2560 10412' MD / 8779' TVDss
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 8972' MD Maximum Hole Angle 100 ° Maximum surface 2150 psig, At total depth (TVD) 8700' / 3200 psig
18. Casing Program Specifications Setting Depth
Size !Top Bottom Quantity of Cement
Hole Casin,q Wei,qht Grade Couplin,q Len.qth .MD TVD MD TVD (include sta,qe data)
3-3/4" 3-3/16" x 6.16# L-80 ST-L 2062' 8350' 8060' 10412' 8779' 84 cu ft Class 'G'
2-7/8"
-
~AI~ 0 7
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary Alaska 0il & Gas Cons. Commission
Total depth: measured 10332 feet Plugs (measured) Anchorage
true vertical 8875 feet
Effective depth: measured 10267 feet Junk (measured)
true vertical 8870 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110'
Surface 2672' 13-3/8" 3720 cu ft Arcticset II 2672' 2672'
Intermediate 8892' 9-5/8" 1218 cu ft Class 'G', 130 cu ft AS I 8892' 8574'
Production
Liner 622' 7" 420 cuft Class 'G' 8413' - 9035' 8121' - 8709'
Scab Liner 720' 5" 200 cu ft Class 'G' 8315' - 9035' 8029' - 8709'
Liner 1347' 2-7/8" 73 cu ft Class 'G' 8985' - 10332' 8662' - 8875'
Perforation depth: measured 9562' - 9700', 9758' - 9800', 9862' - 9883', 9918' - 9940', 10022' - 10104', 10138' - 10180'
true vertical 8862' - 8848', 8846' - 8847', 8848' - 8849', 8850' - 8851', 8856' - 8861', 8863' - 8865'
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Mary Endacott, 564-4388 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the for~egoing is true,and correct to tbe~ best of my knowledge
Signed M.S. Endacott ""-~!/) /~./,:i"?/'~///7'/'"/'ik-~ Title CT Drilling Engineer Date
....... ~, t t, ,-~ ~: ;L,""? ?, ..','..'. · '- ~h?~x:~,: !,'.[ ......................................................
Permit NUmber I APl Number I . ~ ,Approval Date ] See cover letter
o 150-029-20778-02 I {} '0 / I for other requirements
~onditions of Al~proval: Samples Required [] Yes I~1 No Mud'Log Required [] Yes [] No
Hydrogen Sulfide Measures li~ Yes [] No Directional Survey Required EIYes [] No
Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K ~[,3.5K psi for CTU
Other:
ORIGINAL SIGNED BY by order of 4/~_~'/
Approved By D Taylor Seamounl Commissioner the commission Date
Form 10-401 Rev. 12-01-85
Submit In Triplicate
bp
S-08b Sidetrack
Summary of Operations:
S-08a is currently completed in the top of Zone 4B, production rates have been disappointing. Gross fluid
rate has declined from 600 bfpd to 210bfpd and the water cut has increased. The sidetrack, S-08b, will exit
the 5" and 7" liners in the Shublik interval and target a more desirable location in Zone 4. Existing perfs will
be squeezed by pumping ±20 bbls cement past the whipstock. It will be completed with a cased and
perforated 3 Y2"x 2 7/8" liner.
Phase 1
: Drift, set whipstock on E-Line & squeeze with service coil. Planned for Mar 27-28, 2001.
Tubing and liner drifted.
Gas lift mandrels dummied off.
Kinley caliper through tubing and liner.
Master valve, wing valve and tree successfully tested to 5000psi.
Wellhead seals tested for integrity.
Tubing integrity verified.
E-Line will set a mechanical whipstock at ±8,972' in the 5" liner.
Service coil will squeeze ±20 bbls cement past the whipstock to shut off all existing perfs.
Service coil will mill window.
Phase 2: Mill window, Drill and Complete sidetrack: Planned for Apr. 5, 2001.
Drilling coil will be used to drill and complete the directional hole as per attached plan.
Mud Program: · Phase 1' Seawater
· Phase 2: FIo-Pro (8.6- 8.7 ppg)
Disposal: · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program: · Top of 3 3/16" x 2 7/8" liner to be ±8,350' MD (±8060' TVDSS), 2 7/8" will be run from TD to ±9,032'
MD (±8630'TVDSS).
· The tapered liner will be cemented with ±15 bbls cement.
Well Control: · BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2000 psi.
Directional
· See attached directional plan. BHL (State Plane): 619,687; 5,979,855. Max. hole angle is 100deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging · An MWD Gamma Ray log will be run over all of the open hole section.
· A real time Resistivity Log will be run in open hole.
Hazards
The highest H2S recorded to date on S Pad is 120 ppm on S-32 on 1/12/00.
Lost circulation risk is Iow at small fault in Zone 4.
Milling through two strings of casing
Reservoir Pressure
Res. press, is estimated to be 3200 psi at 8700'ss, 7.1ppg EMW. Max. surface pressure with gas
(0.12psi/ft) to surface is 2150 psi.
TRE=, 4-1/16"
WELLHEAD= MCEVOY
ACTUA~'~R=" A'X~SON
~B'i' ~EV "~ ..................................... 67.63'
'B'i~'i' '~'"~'''L- ......................................... 39.63'
Datum MD = RKB,
I 13-3/8", 72#/FT, L-80 BTRS I I 2671'
4 1/2" 12.6#FT, CR-80 TDS TBG,ID=3.958 I I
I 5" 19# LINER(ID=4.408") TOP I [ 8315' I--
I 3 3/16" LINER proposed TOP I I ~ 8350'
I7'' 23# LINER TOP ] I 8413'
5/8" 47#/FT, L-80, BTRS I I 8892'
PERFORATION SUMMARY
REF LOG: PDS MEMORY INDUCTION 4/99
A NG L ~"~'~'"~'~'"~'~i ........... ]
Note: Refer to Production DB for historical perf data
SEE SPF INTERVAL Opn/Sqz DATE
2 4 9562-9700 O
2 4 9758- 9800 O
2 4 9862-9883 O
2 4 9918-9940 O
2 4 10022-10104 O
2 4 10138-10180 O
S-08B (I SAFETY NOTES
PROPOSED CTD SIDETRACK
2081' 1 I OTIS SSSV NIPPLE, ID=-3.813" I
GAS LIFT MANDRELS
STA MD TVD DEV TYPE MAN LATCH
5 3095' 3026' 2 OTIS 11/2RA
4 5168' 4992' 21 ....
3 6841' 6572' 17 ....
2 7886' 7560' 20 " "
1 8112' 7771' 20 ....
8219'
8230'
8231'
8281'
8302'
8314'
4 1/2" SWS NIPPLE, ID=3.813" I
TUBING LATCH ASSY' I
9-5/8" PACKER, ID=4.00" ]
sws I
4-1/2 SWN NIPPLE,
ID milled to =3.80"
4 1/2" WLEG lD=3'833'' I
I 2 7/8', 6.16#/ft, L-80 LNR, .0058 bpf, ID=2.38" I--~ 10332' I--
I 8972'
9032'
2 7/8" cemented and perfed LNR
proposed
WHIPSTOCK proposed
3 3/16" X 2 7/8" XO
10412'
~'Original hole proposed P&A'd with cement
RECEIVED
MAR 0 7 Z001
Alaska 0il & Gas Cons. Commission
Anchorage
1 o2e?' ] I PBTD I
DATE REV BY COMMENTS
INITIAL COMPLETION
04/01/99 Ct SIDETRACK
12/18/00 SlS-JLH PROPOSED CTD SIDETRACK COMPLETION - K.K.
PRUDHOE BAY UNIT
WELL: S-08B
PERMIT No:
APt No: 50-029-20778-60
Sec., N, E, FEL, FNL
BP Exploration (Alaska)
BP Amoco
WELLPATH DET~LS
Parent Wellpath: S-08
Tie on MD: 8912A0
Vertical Se~io. Origin: Slot-68
REFERENCE INFORMATION
Co-ozdina~e (N~) Re~e~er~e: Wea ~ S-08, True
ver~al _(TyD)Reference: Sysa~rc Mean Sea Level
I~m~u~~~kl~mum15: ~.7F,~6/,9~2 O0:OOCunrmure 67.6
ANNOTATIONS ~ -6-~
851~ 8~00.03 Tle-~l ~
Cma~d By:. 8nl Peln~ ~ 1/tl/30131
Contac! Information:
Direct: (907) 267-6613
E-mail: brll.potnla ~lnleq,com
Baker Hughes INTEQ: (907) 267.6600
West(-)/East(+) [lOOft~in]
Vertical Section at 220J)0' [50ft/in]
Plot 1111/2001 10:09 AM
Obp
( BP Amoco (
Baker Hughes INTEQ Planning Report
HNTEQ
.:
Company: BP Amoco , ,,
Field: PrudhoeBay ' .' ,, .. . . ~ '
. .
Site: PBS Pad ...
Wall: · S-08
Wellpath: Plan#1 S-08B
· D~te: ~1/11ao01, ii '~:~ :.~e:i' o9:5i:51 Page:
i'.' Co.°rdinate(NE)Reference: ~':.;,.'Well: S-08, True North ' -
vertical (TVD) Reference: .". System: Mean Sea Level
Section (¥S) Reference:.. Well (0,00E,0,00N,220,00Azi)
Sur~ey Calcnlation Method: . Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Ceo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2000
Site: PBS Pad
TR-12-12
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5980854.54 ft Latitude: 70 21 23.002 N
617919.92 ft Longitude: 149 2 32.343 W
North Reference: True
Grid Convergence: 0.90 deg
Well: S-08 Slot Name: 08
S-08
Well Position: +N/-S-1027.32 ft Northing: 5979855,00 ft Latitude: 70 21 12.897 N
+E/-W 1751.27 ff Easting: 619687,00 ft Longitude: 149 1 41,155 W
Position Uncertainty: 0.00 ft
Wellpath: Plan#1 S-08B Drilled From: S-08
500292077802 Tie-on Depth: 8972,00 ft
Current Datum: 15: 08 7/26/1982 00:00 lleight 67.63 fl; Above System Datum: Mean Sea Level
Magnetic Data: 1/11/2001 Declination: 26.62 dog
Field Strength: 57461 nT Mag Dip Angle: 80.78 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ff ff ff deg
0.00 0.00 0.00 220.00
Plan: Plan #1 Date Composed: 1/11/2001
Based on Lamar's Plan #6 Version: 1
Principal: Yes Tied-au: From: Definitive Path
Targets
Annotation
· .: ,MD" ,: TVD:'::. ::i
8900.03 8513.83
8972.00 8581.95
9209.53 8711.58
9309,53 8711.58
9409.53 8711.58
9566.26 8697.89
9668.96 8680.15
10007.20 8650.38
10412.17 8779.36
Tie-in Point
Kick-off Point
1
2
3
4
5
6
TD.
Plan Section Information
RECEIVED
MAR 0 7 ;'001
Alaska Oil & Gas Cons. Commission
Anchorage
8900.03 18,90 221,33 8513.83
8972.00 18,74 222,08 8581.95
9209.53 90.00 222.08 8711.58
9309.53 90.00 232,08 8711.58
9409.53 90.00 222.08 8711.58
9566.26 100.00 209.95 8697.89
9668.96 99.84 220.37 8680.15
10007,20 90.00 187,85 8650,38
-1631.49
-1648.83
-1783.06
-1851.07
-1919.08
-2044.90
-2127.49
-2430.82
-868.88
-884.32
-1005.53
-1078.67
-1151.81
-1243.42
-1301.60
-1436.58
0.00
0.40
30.00
10.00
10.00
10.00
10.00
10.00
0.00
-0.22
30.00
0.00
0.00
6.38
-0.16
-2.91
0.00
1.04
0.00
10.00
-10.00
°7.74
10.15
-9.62
0.00
123,83
0,00
90,00
270,00
310,00
90,00
255.00
NI.-.-CEiVED
ObP
( BP Amoco f
Baker Hughes INTEQ Planning Report
Company: BP Amoco
Field: Prudh°e Bay '
Site: PB 8 Pad
Well: S-O8
Wellpath: Plan~l S-08B
'Date:' . .i111/2001 ' . Time:: 09:51:51 Page: 2
Ce-erdinnte(NE) Reference: ' Well: 8-08, True North
Vertical (TVD) Referenee: System: Mean Sea Level
~ction (VS) Reference: : Well (0.00E.0.00N,220.00Azi)
Survey CalcUlation Method: Minimum Curvature Db: Oracle
Plan Section Information
MD Incl Azim TVD +N/-S +E/-W DLS:: Build 'Turn TFO Target
ff deg deg ft ' ft :.ft deg/100ft .deg/100ft deg/100ft' deg
10012.18 52.39 171.57 8779.37 -2805.84 -1440.89 10.00 -9.29 -4.02 200.00
Survey
MD Incl .AZlm : . SSTVD : N!S ' :E/W MapN ':'~MnpE: :..DLS ' VS . ' TFO ' Tool
ff deg 'deg ' ff 'ft ":ft~ '':It',".:.:' deg/lOOft, ft
..
8900.03 18.90 221.33 8513.83 -1631.49 -868.88 5978209.98 618844.37 0.00 1808.30 0.00 MWD
8925.00 18.84 221.59 8537.46 -1637.54 -874.23 5978203.84 618839.12 0.40 1816.37 123.83 MWD
8950.00 18.79 221.85 8561.12 -1643.56 -879.59 5978197.74 618833.85 0.40 1824.43 123.59 MWD
8972.00 18.74 222.08 8581.95 -1648.83 -884.32 5978192.39 618829.21 0.40 1831.51 123.34 MWD
8975.00 19.64 222.08 8584.78 -1549.56 -884.98 5978191.65 618828.56 30.00 1832.49 0.00 MWD
9000.00 27.14 222.08 8607.71 -1656.92 -891.63 5978184.19 618822.03 30.00 1842.40 360.00 MWD
9025.00 34.64 222.08 8629.15 -1666.44 -900.22 5978174.53 618813.59 30.00 1855.22 0.00 MWD
9050.00 42.14 222.08 8648.73 -1677.96 -910.62 5978162.85 618803.38 30.00 1870.72 360.00 MWD
9075.00 49.64 222.08 8666.12 -1691.27 -922.64 5978149.35 618791.57 30.00 1888.65 360.00 MWD
9100.00 57.14 222.08 8681.02 -1706.15 -936.08 5978134.25 618778.37 30.00 1908.69 0.00 MWD
9125.00 54.64 222.08 8693.17 -1722.35 -950.71 5978117.82 618764.01 30,00 1930.50 360.00 MWD
9150,00 72.14 222,08 8702.37 -1739.59 -966.27 5978100.34 618748.72 30,00 1953,71 0.00 MWD
9175,00 79,64 222,08 8708,46 -1757,58 -982,51 5978082,10 618732.77 30,00 1977,93 0.00 MWD
9200,00 87,14 222,08 8711,34 -1775,99 -999,14 5978063,42 618716.44 30.00 2002,73 360,00 MWD
9209,53 90,00 222.08 8711,58 -1783,06 -1005,53 5978056,26 618710,17 30,01 2012,25 0,00 MWD
9225.00 90.00 223.63 8711.58 -1794.40 -1016.05 5978044.75 618699.83 10.00 2027.70 90.00 MWD
9250.00 90.00 226.13 8711.58 -1812.11 -1033.69 5978026.76 618682.48 10.00 2052.60 90.00 MWD
9275.00 90.00 228.63 8711.58 -1829.04 -1052.08 5978009.54 618664.36 10.00 2077.39 90.00 MWD
9300.00 90.00 231.13 8711.58 -1845.15 -1071.20 5977993.13 618645.50 10.00 2102.02 90.00 MWD
9309.53 90.00 232.08 8711.58 -1851.07 -1078.67 5977987.09 618638.13 10.00 2111.36 90.00 MWD
9325.00 90.00 230.53 8711.58 -1860.74 -1090.74 5977977.23 618626.21 10.00 2126.53 270.00 MWD
9350.00 90.00 228.03 8711.58 -1877.05 -1109.69 5977960.62 618607.53 10.00 2151.20 270.00 MWD
9375.00 90.00 225.53 8711.58 -1894.17 -1127.91 5977943.22 618589.59 10.00 2176.02 270.00 MWD
9400.00 90.00 223.03 8711.58 -1912.06 -1145.36 5977925.05 618572.42 10.00 2200.95 270.00 MWD
9409.53 90.00 222.08 8711.58 -1919.08 -1151.81 5977917.93 618566.09 10.00 2210.47 270.00 MWD
9425.00 90.99 220.89 8711.45 -1930.67 -1162.06 5977906.18 618556.03 10.00 2225.93 310.00 MWD
9450.00 92.60 218.98 8710.66 -1949.83 -1178.10 5977886.77 618540.30 10.00 2250.92 309.99 MWD
9475.00 94.20 217.06 8709.18 -1969.49 -1193.47 5977866.87 618525.25 10.00 2275.86 309.93 MWD
9500.00 95.80 215.13 8707.00 -1989.61 -1208.14 5977846.51 618510.90 10.00 2300.70 309.82 MWD
9525.00 97.39 213.18 8704.13 -2010.16 -1222.08 5977825.75 618497.29 10.00 2325.41 309.65 MWD
9550.00 98.98 211.23 8700.57 -2031.09 -1235.27 5977804.61 618484.44 10.00 2349.92 309.42 MWD
9566.26 100.00 209.95 8697.89 -2044.90 -1243.42 5977790.67 618476.51 10.00 2365.74 309.16 MWD
9575.00 100.00 210.84 8696.37 -2052.32 -1247.77 5977783.18 618472.27 10.00 2374.23 90.00 MWD
9600.00 99.98 213.38 8692.03 -2073.18 -1260.86 5977762.12 618459.52 10.00 2398.61 90.15 MWD
9625.00 99.95 215.91 8687.71 -2093.43 -1274.86 5977741.65 618445.85 10.00 2423.12 90.59 MWD
9650.00 99.89 218.45 8683.40 -2113.05 -1289.74 5977721.79 618431.29 10.00 2447.72 91.03 MWD
9668.96 99.84 220.37 8680.15 -2127.49 -1301.60 5977707.17 618419.66 9.97 2466.40 91.42 MWD
9675.00 99.68 219.78 8679.13 -2132.04 -1305.43 5977702.55 618415.90 10.00 2472.36 255.00 MWD
9700.00 99.02 217.33 8675.06 -2151.33 -1320.81 ,5977683.02 618400.84 10.00 2497.01 254.90 MWD
9725.00 98.35 214.90 8671.29 -2171.30 -1335.37 5977662.83 618386.60 10.00 2521.67 254.50 MWD
9750.00 97.66 212.47 8667.81 -2191.89 -1349.10 5977642.02 618373.20 10.00 2546.27 254.13 MWD
9775.00 96.95 210.05 8664.63 -2213.09 -1361.97 5977620.62 618360.67 10.00 2570.78 253.80 MWD
9800.00 96.24 207.64 8661.76 -2234.84 -1373.95 5977598.69 618349.00 10.00 2595.14 253.49 MWD
9825.00 95.51 205.24 8659.20 -2257.11 -1385.02 5977576.25 618338.33 10.00 2619.32 253.21 MWD
9850.00 94.77 202.84 8656.96 -2279.84 -1395.16 5977553.35 618328.55 10.00 2643.26 252.97 MWD
9875.00 94.03 200.45 8655.04 -2303.01 -1404.36 5977530.04 618319.73 10.00 2666.91 252.75 MWD
9900.00 93.27 198.06 8653.45 -2326.56 -1412.58 5977506.37 618311.88 10.00 2690.24 252.57 MWD
9925.00 92.52 195.67 8652.18 -2350.46 -1419.83 5977482.36 618305.02 10.00 2713.20 252.42 MWD
O bP
Company: BP Amoco
BP Amoco
Baker Hughes INTEQ Planning Report
INTEQ
Field: Prudh°e Bay
Site: PBS Pad'
Well: S-08
Wellpath: Plan#1 S-08B
SSTVD
ft
8651.25
page: 3
"Co-ordinate(NE) Reference: ~i..Well! SO8, TrUe North
'Vertical (TVD) Reference:· 'System: Mean Sea Level
Section (¥$) Reference: - Well (0.00E,0.00N,220.00Azi)
· SurVey CalcUlatiOn Method:
Minimum Curvature Db: Oracle
N/S . E/W M~pN ', 'MapE:. DLS VS TFO Tool
~ff"."".".."..:"~ ~"' · . ~ iff.. deg/100ft ~ deg
-2374.64 -1426.07 5977458.08 618299.16 10.00 2735.74 252.29 MWD
-2399.08 -1431.31 5977433.57 618294.32 10.00 2757.83 252.21 MWD
Survey
MD lnd Azim
ft deg. deg
9950.00 91.75 193.29
9975.00 90.99 190.91
8650.65
10000.00 90.22 188.53 8650.39
10007.20 90.00 187.85 8650.38
10025.00 88.33 187.24 8650.64
10050.00 85.98 186.38 8651.88
10075.00 83.63 185.52 8654.15
10100.00 81.28 184.65 8657.43
10125.00 78.94 183.77 8661.72
10150.00 76.60 182.87 8667.02
10175.00 74.26 181.96 8673.31
10200.00 71.92 181.03 8680.58
10225.00 69.59 180.07 8688.81
10250.00 67.27 179.08 8698.00
10275.00 64.95 178.06 8708.13
10300.00 62,64 176.99 8719.17
10325,00 60.34 175.89 8731.10
10350,00 58.04 174.73 8743.90
10375.00 55.76 173.51 8757.55
10400.00 53.49 172.22 8772.03
10412.18 52.39 171.57 8779.37
-2423.72 -1435.53 5977408.87 618290.49 10.00 2779.41 252.15 MWD
-2430.82 -1436.58 5977401.75 618289.55 9.93 2785.53 251.89 MWD
-2448.46 -1438.92 5977384.07 618287.50 10.00 2800.55 200.00 MWD
-2473.25 -1441.88 5977359.24 618284.93 10.00 2821.44 200.01 MWD
-2498.02 -1444.46 5977334.44 618282.75 10.00 2842.07 200.05 MWD
-2522.70 -1446.66 5977309.73 618280.94 10,00 2862.39 200.13 MWD
-2547.26 -1448.47 5977285.14 618279.53 10.00 2882.37 200.24 MWD
-2571.65 -1449.88 5977260.74 618278.50 10.00 2901.96 200.40 MWD
-2595.82 -1450.91 5977236.55 618277.87 10.00 2921.14 200.58 MWD
-2619.73 -1451.53 5977212.64 618277.62 10.00 2939.86 200.81 MWD
-2643.33 -1451.76 5977189.04 618277.77 10.00 2958.08 201.09 MWD
-2666.58 -1451.59 5977165.80 618278.32 10.00 2975.78 201.40 MWD
-2689.43 -1451.02 5977142.96 618279.25 10.00 2992.92 201.77 MWD
-2711.83 -1450.05 5977120.58 618280.57 10.00 3009.46 202.18 MWD
-2733.76 -1448.69 5977098.68 618282.29 10.00 3025.38 202.65 MWD
-2755,16 -1446.94 5977077,31 618284,38 10.00 3040.64 203.18 MWD
-2775.99 -1444.79 5977056.52 618286.86 10.00 3055.22 203.77 MWD
-2796.21 -1442.26 5977036.34 618289.71 10.00 3069.09 204.44 MWD
-2805.84 -1440.89 5977026.74 618291.23 10.01 3075.58 205.05 MWD
RECEIVED
MAR 0 ? ZOO1
Alaska Oil & Gas Cons. Commission
Anchorage
2 3/8" CT -~11
I 10,000 psi
Pack-Off
Lubricator~
Nordic 1
S-08B
CT Drilling & Completion BOP
7 1/16"
Annular
Pipe/Slips
7 1/16"
Pipe/Slips
I
2 7/8"
--- 2 3/8"
SWAB OR MASTER VALVE
RECEIVED
I~,q l~ 0 7 ~ 0 01
Alaska Oil & Gas Cons. Commission
Anchorage
H 1 2856
DATE I I CHECK NO.
01/30/01I 0018285~
VENDOR ALASKAO I LA OO
-..
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
012~01 CKO12gOlO 100.00 100.00
PYMT (:OMMENTS: Peem)it to Drill ! ee
HANDLINO INST: S/H - Teeeie Hub~ le X4&~8
IE ATTACHED CHECK ms IN PAYMENT FOR ITEMS DESCRIBED ABOVE. ~ 1OO. CO 1OO. CO
..:BP.EXPLORATION (ALASKA),JNC.
"' :~.0.::~bX:196~12 .. i:::.:::.. -'!' : ?i~ ?":: ::.......:.:~.'.
:.. ANGHORAGE, ALASKA 99519-6612
:,!i!:;..' ':: ':' · · . ,:' ',,.;i.,,':'. :' ::i' :' '¥'!:':
':,'?.":! ,' . :'i' , AW 'AI~I, EIATE O~ ':~ .:~' "': :: :',~ .,
:::,,":/:,.:~..', ~ "~EV~AhD, OH'lb .:',., :'. :'"
: ~',: ,,: :, ,,,.:: ,. ~,:,,: ., ~,; ,.', ;::,,: ,,. ::,.: ::
..":':;;' .:';~;::':,:~'-~s9 ~;.~ ~..:'~'
.....,. ~. ,,, .
PAY
To'?'.:'Th.e::;,:~ ::,ALASKA OIL AND ::::OAS:::..~:. .'i" l:'m: :' :mi:':'
ORDER' ':'~ONSERVAT I ON :::;~[3~Mi''SS'! ON :::::::::::::::::::::::::
::':':::0~ '?' . :::333 .EST 7TH ====================== SbI~':'::?lO0
AK 99501
ANCHORAOE
"' ~,G ~G 5 r=,' m-'O h ~ ~0 :~G c] 5m=_ OOR h h ~
FIELD 8, POOL ~ ~/0/.~' h
COMPANY ~/~ WELL NAME~
INIT CLASS ,~ ~' /-
ADMINISTRATION
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available-in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can.be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
Conductor string provided ...................
14.
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..... .....
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate weilbore separation proposed ....... ~. ....
23. If diverter required, does it meet regulations ..........
PROGRAM: exp
G~L AREA
Y N
Y N
Y N
Y N
Y N
Y N
N.
Y N
Y N
Y N
Y N
dev ~ reddl ,',,y" serv wellbore sag
ann. disposal para req
UNIT# ///~",~' <:~ ON/OFF SHORE
..
,,Y. N
24. Drilling.fluid program schematic & equip list adequate ..... (~N c - - - , . r t -- . , , ~.~,,
JJ ,~,' 25- BOPEs, d° they meet regulation ........ _. '... L'~ N ~c>~,~,~ ~.~,~,--~ ~- ~ 3 !(~" \-~ e',R.~: ,o,">c~-"~-."~-t ~?'ee'r '5 ~ ~\o~~ ....
· - . _
DATE 26. BOPE press rating appropriate; test to ~5~ psig. ~ N
fv~ N - ~ ~' ~ '
27.
Choke manifold ~mplies w/APl RP-53 (May 84) ......... ~ ~ ~ ~ ,
28. Work will o~ur without operation shutdown.
29. Is presen~ of H2S gas probable ................. Y
GEOLOGY 30. Pe~it ~n be issued wlo hydrogen sulfide measures. ' Y' N ~ ~~%, '
' 31. Data presented on Potential ove~ressure zones ....... Y N/
' 32. Seismic analysis of shallow gas zones .......... '. · · Y~
II AP~R D~T~ 33. Seabed condition suwey (if off-shore) ........... . . ~ N
co.,a name/phOne for weekly progress reports [explorato~ on~ Y N ~ . ' _ ~ . . .
II ANNU~ DISPOS~[35. With proper cementing records, this plan
IJ (A) will contain waste in a suitable re~iving zone~ .... ... Y N ~ ~ ' ~ II
IIAPPR DATE . (B) will not ~ntaminate freshwater; or,use dHllingwaste ... y N / , ~ ~ , ~ ' II
" , to su a ; ' "
.. (C) will not impair mechaniCal integH~ of the well used for disPosal; Y N '
(D) will not damage producing formation or impair recove~ from a Y N
.. pool;and ' ~ ~ II
. (~). will not circumvent 20 ~C 25.252 or 20 ~C 25.412. . Y N
GEOLOGY: ENGINEERING:. ' UlCl~nnular COMMISSION: . Commen~llnstructions' '
. WM ', ' Il
TE~~ ~/,,_ JMH ~j ~ ~,~ ~ i II
ICI
O
Z
O
-I
c:~msoffice\wordian~diana\checklist (rev. 11101fl00)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPE .N. DIX:
No 'special'effort has been made to chronologically
organize this category of informatiOn.
Sperry-Sum Drilling Services
LIS Scan UtiliEv
SRevision: 3 $
LisLib SRevision: 4 $
Wed Sep 04 06:21:47 2(/02
Reel Header
Service name ............. LISTPE
Date ..................... 02/09/04
Origin ................... STS
Reel Name ................ UN~OWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Tape Header
Service name ............. LISTPE
Date ..................... 02/09/04
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
~WD RUN 1
AK-MW-10135
B. JAHN
GOODRICH / S
S-08B
500292077802
BP Exploration (Alaska), Inc.
Sperry Sun
03-SEP-02
MWD RUN 2 MAD RUN 2
AK-MW-10135 AK-MW-10135
B. JAHN B. JAHN
GOODRICH / S GOODRICH / S
35
12N
12E
1640
1525
67 . 63
66.60
39.60
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 7.000 8960.0
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
MWD RUN i IS DIRECTIONAL, WITH NATURAL, GAMMA PROBE
(NGP)
UTILIZING A SCINTILLATION DETECTOR.
MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER
MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4).
ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4) DATA
FROM
8957' MD, 8568' SSTVD TO 9186' MD, 8718' SSTVD WAS
OBTAINED ON A
MADPASS WHILE RUNNING IN THE HOLE BEFORE DRILLING
MWD RUN 2
AND IS APPENDED TO MWD RUN 2 DATA TO COMPLETE THE
RESISTIVITY DATA.
5. A MADPASS WAS PERFORMED WHILE PULLING OUT OF THE
HOLE AFTER
DRILLING MWD RUN 2 AND IS PRESENTED AS A TAIL TO
THIS LOG.
6. DIGITAL DATA ONLY IS DEPTH CORRECTED TO THE PDC LOG
OF 04/06/01
(MCNL GR) WITH A KBE OF 67.63' AMSL.
THIS WELL KICKS OFF FROM S-08 AT 8960' MD, 8571'
SSTVD (TOP OF WHIPSTOCK).
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCES.
7.
MWD RUNS 1 & 2 REPRESENT WELL S-08B WITH API #
50-029-20778-02.
THIS WELL REACHED A TOTAL DEPTH OF 10650' MD, 8751'
SSTVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY
EXTRA SHALLOW SPACING )
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY
SHALLOW SPACING
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY
MEDIUM SPACING )
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY
DEEP SPACING )
SFXE = SMOOTHED FORMATION EXPOSURE TIME
CURVES WITH THE EXTENSION "M" ARE MEASURED AFTER
DRILLING (MAD)
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/09/04
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
RPD
RPX
RPM
FET
RPS
GR
ROP
.5000
START DEPTH
8950 0
8950 0
8950 0
8950 0
8950 0
8959 0
8983 5
STOP DEPTH
]..061.2 5
10612 5
10612 5
10612 5
10612 5
10601 5
10649.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DE?TH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH
8956 5
8961 0
8964 0
8968 5
8973 0
89°~ 0
8988 5
9003 0
901'7 0
9019 5
9023 0
9025 0
9028 0
9031 0
9032 5
9036 5
9040.0
9051.0
9054 . 5
9058.0
9062.0
9068.0
9082.0
9084.0
9096.5
9102.5
9109.5
9112.5
9123 5
9130 5
9142 0
9147 0
9153 0
9160 0
9167 5
9172 0
9195.5
9203.0
9239.0
9254.0
9264.0
9303.5
9315.5
9324 0
9332 0
9346 5
9354 0
9360 0
9370 5
9375 0
9378 5
9413 5
9416 0
9419 5
9424 0
9428 5
9436 0
9447 0
9452 0
9462 5
9468 0
9474 0
9477 5
9486 0
9495 5
94 99 0
9524 0
9530 5
9553 0
GR
8956 5
8961 0
8967 5
u°972 5
8977 0
8981 0
8988 0
90{i}1 5
9015.0
9018.5
902'2.5
9025.0
9027.5
9030.0
9032.0
9036.0
9039.0
9050.5
9054.5
9057.5
9062.0
9068.0
9082.0
9084.5
9096.0
9102.5
9110.0
9112.5
9123.0
9131 0
9142 5
9147 5
9153 5
9159 5
9167 5
9172 0
9196 5
9203 5
9238 0
9251 5
9261 5
9302 5
9314 5
9324 5
9333 5
9347 5
9353.5
9360.0
9368.0
9374.0
9377.5
9414.5
9418.0
9420.0
9424.5
9429.5
9435.0
9445.5
9451.5
9463.5
9468.0
9474.5
9477.0
9484.5
9493.5
9498.5
9524.5
9532.5
9553.0
9567.5
9576.5
9579.5
9589.5
9594.0
96{}6.0
9623.0
9631.0
9641.5
9647 5
9656 0
9662 5
9704 0
9711 5
9716 0
9733 0
9739 0
9757 0
9763 5
9770 0
9772 0
9774 0
9777 0
9782 0
9787 5
97 93 0
97 97 0
9800 0
9802 5
981.0.5
9815.5
9825.0
9833.5
9837.0
9839.5
9843.0
9844.5
9850.5
9856.0
9858.5
9872.5
9901.5
9906.0
9910.0
9918.0
9926.0
9934.5
9946 5
9964 0
9976 0
9988 5
9995 0
10004 0
10019 0
10024 0
10032 0
10055.0
10061.0
10068.5
10088.5
10094.5
10100.0
10104.0
1.0109.0
10118.0
10136.0
10137.5
10145.0
10146.5
10152.0
10164.0
10174.5
10180.5
10189.5
10197.5
9567.5
9576.5
9579.0
9589.0
9594 . 0
9606.5
9624.0
9632.0
9643.5
9648.5
9657 0
9663 0
9705 5
9713 5
9717 5
9736 0
9743 5
97 60 5
9769 5
9775 0
9778 0
9779.5
9782.0
9786.5
9791.5
97 95.5
97 98.0
9800.5
9803.5
9813.0
9819.0
9827 0
9834 5
9837 5
9841 5
9846 0
9847 5
9852 0
9857 5
9863 0
9876 0
9904 0
9909 0
9912 0
9920 0
9928 0
9938.5
9949.5
9967 0
9978 0
9988 0
9995 5
10005 0
10019 5
10024 5
10034 5
10059 0
10063 0
10070 5
10089 5
10095 5
10102 5
10107 5
10110 0
10119 5
10137 0
10141 0
10147 0
10150 0
10155 0
10165 5
10177 0
10183 0
10193 0
10200 0
10214.0
10216.5
10226.0
10231.5
161235.0
10239 0
1,0243 0
10251 0
10253 5
10257 0
10267 0
10275 0
10296 0
10300 0
10302 0
10304 5
10314 5
10335 0
10340 5
10346 0
10350 0
10353 0
10366.5
10376.5
10398.5
10402.5
10427.5
10452.0
10460.0
10467.0
10482.0
10502.0
10504.5
10521.0
1.0524 5
10534 0
10538 5
10540 0
10548 0
10550 5
10560 5
10574 0
10649 0
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
10216.0
10218.5
10228.0
10234 5
10237 5
10241 0
10246 0
10254 0
10256 5
10266) 0
10269 0
10277 5
10298 0
10300 5
10302 0
10304 0
10316 0
10337 0
10343 0
10346 5
10349 5
10352 5
10368 0
10377 0
10401 0
10404 5
10428 5
10451 0
10460.0
10466.5
10482.5
10501.5
10503.5
10519.5
10524.0
10535.0
10538.0
10539.0
1.0547.0
10550.5
10561.5
10575.0
10650.0
BIT RUN NO MERGE TOP MERGE BASE
1 8959.0 9220.0
2 9220.5 10650.0
REMARKS: MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. [)own
Optical 1, og depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-'type...0
Name Service Order
U'ni'ts Size Nsam Rep Code Offset Channel
DE PT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
R PX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 i 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FE T MWD HR 4 i 68 28 8
Name Service Unit Min Max
DE PT FT 8950 10649
ROP N~qD FT/H 0.41 2096.51
GR MWD AP1 18. 02 896.21
RPX MWD OHMM 0.22 2000
RPS HWD OHMM 0.1 2000
RPM MWD OHMH 0.29 2000
RPD HWD OHMH 0.11 2000
FET HWD HR 0.28 15.91
First Reading For Entire File .......... 8950
Last Reading For Entire File ........... 10649
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/09/04
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Mean
9799.5
90 5173
46 8544
14 3614
20 2079
24 3655
25 3147
2 6211
Nsam
3399
3332
3286
3326
3326
3326
3326
3326
Fi rst
Reading
8950
3.5
8959
8950
8950
°950
8950
8950
Last
Reading
10649
10649
10601.5
10612.5
10612.5
10612.5
10612.5
10612.5
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
'Version Number ........... 1.0.0
Date of Generation ....... 02/09/04
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
EDITED MERGED MAD
Depth shifted and clipped curves; all MAD runs merged using earliest passes.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
FET 8956.5 10613.0
RPM 8956.5 10613.0
GR 8956.5 10601.5
RPD 8956.5 10613.0
RPX 8956.5 10613.0
RPS 8956.5 10613.0
RAT 8997 . 0 1,064 9.0
$
MERGED DATA SOURCE
PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE
MWD 2 1 8950.0 10650.0
$
REMARKS: MERGED MAD PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Blook Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Doeth Units .......................
Datum Specification Block sub-type...0
Name Service Order
Units Size Nsam Rep Code Offset Channel
DE PT FT 4 1 68 0 i
~tAT MAD FT/H 4 1 68 4
GR MAD API 4 1 68 8
RPX MAD OHP~4 4 1 68 12 4
RPS MAD OHM 4 1 68 16 5
RPM MAD OHMM 4 1 68 20 6
RPD MAD OHMM 4 1 68 24 7
FET MAD HR 4 1 68 28 8
Name Service Unit Min Max
DEPT FT 8956.5 10649
RAT MAD FT/H 981.78 1226.23
GR MAD API 13.08 366.51
RPX MAD OHMM 0.13 2000
RPS MAD OHMM 0.1 2000
RPM MAD OHMM 0.19 2000
RPD MAD OHMM 0.12 2000
FET MAD HR 0.47 60.74
First Reading For Entire File .......... 8956.5
Last Reading For Entire File ........... 10649
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/09/04
Maximum Physical, Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Mean
9802.75
1073.76
41.2894
15.2057
14.8576
20.6648
21.4858
29.2288
Nsam
3386
3305
3291
3314
3314
331.4
3314
3314
First
Reading
8956.5
8997
8956.5
8956.5
8956.5
8956.5
8956.5
8956.5
Last
Reading
10649
10649
10601.5
10613
10613
10613
10613
10613
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ........ 02/09/04
Maximum Physical Record..65535
File Type ................ LO
Previous Fi].e Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 8959.0 9188.5
ROP 8982.5 9220.0
$
LOG HEADER DATA
DATE LOGGED: 23-APR-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.5
DOWNHOLE SOFTWARE 'VERSION: 3.01
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 9220.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...O
18.8
91.8
TOOL NUMBER
033
3.750
Flo Pro
8.53
65.0
10.0
148000
7.0
.000 ,0
.000 154.0
.000 .0
.000 ,0
Name Service Order Units Size Nsam Rep Code Offset Channel
1DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 AP1 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 8959 9220 9089.5 523
ROP MWD010 FT/H 0.41 2096.51 122.002 476
GR MWD010 API 21.'79 896.21 108.766 460
First Reading For Entire File .......... 8959
Last Reading For Entire File ........... 9220
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/09/04
Fi rst
Reading
8959
8982.5
8959
Last
Reading
9220
9220
9188.5
Maximum Physical Record..65535
File TFpe ................ LO
Ne:-:~ File Name ........... STSLiB.
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.61.0
Date ef Generatien ....... 02/09/04
Ma:,'imum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and leg header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUFMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 8950.0 10613.5
RPD 8950.0 10613.5
RPM 8950.0 10613.5
RPS 8950.0 10613.5
RPX 8950.0 1061.3.5
GR 9189.0 10602.5
ROP 9220.5 10650.0
$
LOG HEADER DATA
DATE LOGGED: 25-APR-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.5
DOWNHOLE SOFTWARE VERSION: 4.30
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 10650.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL {FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 64.1
MAXIMUM ANGLE: 99.4
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PB01862RF3
EWR4 ELECTROMAG. RESIS. 4 PB01862RF3
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 3.750
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE: FloPro
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S): 65.0
MUD PH: 9.5
MUD CHLORIDES (PPM): 88800
FLUID LOSS (C3): 7.0
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .180 69.0
MUD AT MAX CIRCULA'rING TERMPERATURE: .078 167.7
MUD FILTRATE AT MT: .450 69.0
MUD CAKE AT MT: .230 69.0
NEUTRON TOOL,
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL ST~qDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type .....
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order
Units Size Nsam Rep Code Offset Channel
DEFT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX M~D020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HR 4 1 68 28 8
Name Service Unit Min Max
DEFT FT 8950 10650
ROP MWD020 FT/H 1.].3 200.].6
GR MWD020 API 18.02 137.31
RPX MWD020 OHMM 0.22 2000
RPS MWD020 OHMM 0.1 2000
RPM MWD020 OHMM 0.26 2000
RPD MWD020 OHMM 0.11 2000
FET MWD020 HR 0.28 15.91
First Reading For Entire File .......... 8950
Last Reading For Entire File ........... 10650
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/09/04
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Heart
9800
84.6052
35.9386
14.9491
20.3736
24.3205
26.0273
2.62577
Nsam
3401
2860
2828
3328
3328
3328
3328
3328
First
Reading
8950
9220.5
91,89
8950
8950
8950
8950
8950
Last
Reading
10650
10650
10602.5
10613.5
10613.5
10613.5
1,0613.5
10613.5
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/09/04
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MAD
Curves and log header data for each pass of each run in se~arat, e fii. es.
DEPTH INCREMENT: .5006,
MAD RUN NUMBER:
MAD PASS NUMBER: _
FILE SU~'~RRY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 8956.5 10614.0
RPD 8956.5 10614.0
RPM 8956.5 10614.0
RPS 8956.5 10614.0
RPX 8956.5 10614.{,
GR 8956.5 10602.5
RAT 8996.0 10650.0
$
LOG HEADER DATA
DATE LOGGED: 25-APR-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.5
DOWNHOLE SOFTWARE VERSION: 4.30
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 10650.0
TOP LOG INTERVAL (FT):
BOTTOH LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIHUM ANGLE: 64.1
MAXIMUM ANGLE: 99.4
TOOL STRING (TOP 'PO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PB01862RF3
EWR4 ELECTROMAG. RESIS. 4 PB01862RF3
$
BOREHOLE AND CASING ~ATA
OPEN HOLE BIT SIZE (IN): 3.750
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF}
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOl,
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
FioPro
8.70
65.0
9.5
88800
7.0
.180 69.0
.078 167.7
.450 69.0
.230 69.0
Name Service Order
Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MAD021 FT/H 4 1 68 4 2
,iR MAD021 API 4 1 68 8 3
RPX MAD021 OHMM 4 1 68 12 4
RPS MAD021 OHMM 4 1 68 16 5
RPM MAD021 OHMM 4 1 68 20 6
RPD HAD021 OHHH 4 1 68 24 U
FET MAD021 HR 4 1 68 28 8
Name Service Unit Min Max Mean Nsam
DEPT FT 8956.5 10650 9803.25 3388
RAT MAD021 FT/H 981.78 1226.23 1073.77 3309
GR MAD021 API 13.08 366.51 41.158 3293
RPX MAD021 OHMM 0.13 2000 14.7887 3316
RPS MAD021 OHMM 0.1 2000 15.4451. 3316
RPM MAD021 OHMM 0.19 2000 21.8235 3316
RPD MAD021 OHMM 0.12 2000 22.8864 3316
FET MAD021 HR 0.47 60.74 29.2551 3316
First Reading For Entire File .......... 8956.5
Last Reading For Entire File ........... 10650
File Trailer
Service name ............. STSLIB.O05
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/09/04
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
First Last.
Reading Reading
8956.5 1065{I
8996 10656}
8956.5 106{}2.5
8956.5 10614
8956.5 10614
8956.5 10614
8956.5 10614
8956.5 10614
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 02/09/04
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01,
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 02/09/04
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN