Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-053 . STATE OF ALASKA
AL A OIL AND GAS CONSERVATION COMMI: iN
REPORT OF SUNDRY WELL OPERATIONS
1 Operations Abandon❑ Repair Well ❑ Plug Perforations ❑ Perforate Other L Mill CIBP
Performed Alter Casing❑ Pull Tubing ❑ Stimulate-Frac ❑ Waiver Time Extension❑
Change Approved Program❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended W❑
2 Operator '4 Well Class Before Work 5 Permit to Drill Number
BP Exploration(Alaska),Inc
Name Development 2 Exploratory ID 201-053-0
3.Address P.O Box 196612 Stratigraphic ❑ Service 6.API Number
Anchorage,AK 99519-6612 50-029-20085-01-00
7.Property Designation(Lease Number). 8 Well Name and Number
ADL0028280 PBU F-03A
9 Logs(List logs and submit electronic and pnnted data per 20AAC25.071) 10 Field/Pool(s).
PRUDHOE BAY,PRUDHOE OIL
11 Present Well Condition Summary'
Total Depth measured 12364 feet Plugs measured None feet
true vertical 9028 97 feet Junk measured 12289 feet
Effective Depth measured 12298 feet Packer measured See Attachment feet
true vertical 9035 31 feet true vertical See Attachment feet
Casing Length Size MD ND Burst Collapse
Structural None None None None None None
Conductor 95 30"STOVE PIPE 18.5-113 5 18 5-113 5 0 0
Surface 2306 87 18-5/8"96 5#K-55 18-2324.87 18-2324 83 930 870
Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Production None None None None None None
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation depth Measured depth 11120-11150 feet 11450-11475 feet 11500-11525 feet 11537-11562 feet 11600-11625 feet
11670-12050 feet 12160-12279 feet
True Vertical depth 9000 48-9021 83 feet 9058 13-9054 87 feet 9052 42-9051 28 feet 9051 15-9051 5 feet 9052 2-9051 38 feet
9045 72-9028.84 feet 9036 76-9036 54 feet
Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment
Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer
None None None yipl
12 Stimulation or cement squeeze summary n { 5
Intervals treated(measured) SAN % 2i��
S
Treatment descriptions including volumes used and final pressure
13 Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
•
Prior to well operation 289 20099 25 320 1053
Subsequent to operation. 354 14898 24 350 1079
14 Attachments. 15 Well Class after work.
Copies of Logs and Surveys Run Exploratory ❑ Development Li Service ❑ Stratigraphic ❑
Daily Report of Well Operations X 16 Well Status after work Oil 0 Gas ❑ WDSPL ❑
GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP ❑ SPLUG ❑
17.I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt:
N/A
Contact Garry Catron Email Garry.CatronBP.Com
Printed Name Garry Catron Title PDC PE
Signature iflucAsiPhone 564-4424 Date 1/12/2015
`
17r7-- //2--q1 c 5--- RBDMS"(`Y JAN 1 3 1015
, i 0-0/r
Form 10-404 Revised 10/2012 Submit Original Only
Packers and SSV's Attachment
ADL0028280
SW Name Type MD TVD Depscription
F-03A PACKER 9296.94 7550.65 4-1/2" Otis HB Packer
F-03A PACKER 11076.88 8965.19 4-1/2" Baker SAB Perm Packer
a O O O O cn 0 0 0
0 • CO N 0 0 O O
- I� ti N
0 V f� 0
U
O o
ob
i ON- N NO CO CO
7 CO O 00 CO CO Lt) CO 00 O O i- co
CA M
Lt) p) O M C) co O C)
M 0 00 V O N
N O LC) N
N CO O CA r- O CO U) O)
N CO CO CO CA N I- co
H
CA L!) as
N N o N O
0
co CO 0 0
a- 1 0 L()
N CO COCD I-
(Dm oi 000
0 0 0 0 0 M N LI) 0O 0
N N o r O N N N-
� r r r
C.) o
• O 2
▪ co
< N 0 0
CA 0 CO O L() O 00 •00 V CO
• N N 0 0 N
O N (A 1- 1- CA
•
z
1- 9WoO Ooo
� co 0, Co ° "'
O co , Y co
JZZDOJ
C a) Z N * aoo
'N N0CO � � a) (60) 7 -1
pO 00 NCV CV
o
• 0 0 M N 0
� N
4
L
+-' co CA CA co
131 Lt) 00 CO O CO CO O CO O
O C) NN- CO 0 N CO N CO
G) N N N- N N O) N-
J
W W W
Nc U 0 0 a W
U
U p eC cC CC E c.� Z ZZ
Z W W W W W w c m m
0 I- I Z Z Z D D D
U Z Z Z J J J (fJ H
(11
/\ F=
I / 2 / 0/
/ 2 § u) i
% o w f cC /
Q2 � — =
U » c co
k 2 ® � m 2
E _
C = / / k \
O t ® /
c« co a E m
P. % $ ° \
»2CkCa
° \ $ w y R
j _0_ m
± GE« & 7
= =
_
c O)2 0
- F $ 4 q O
6
Cl) \ $ $ 3 % �� 2
2 fob / � k % a
co .« / & / / q
a m 6- a
a f $ / _/ — %
2 n / c /_ $ cci )
& q ` . 2f J2 / 2 /
4- 0 % / t \a. / k $ I /
-t 0 = ' ,- c 2 3 2 / e5
o <0. , 2 o 3 \ K 0 3 f
$ E f - \ /
CL - ° ® � £ _ =
/ V = CO � � $
E_» $ 3 a E g _-
13 H \ / / / .-6 \ f / $
m E — «
0 3 2 2 a) - o t
- / co .17ZS \ 2 as /\ o\
2777co e
® \ k k R / ƒ / LL o
2 g \\ ° § cl. 0 50 2 I \
/ - - c \ /� � * / E /
\ , 02E t (Do_ :
II
xl #
0
p74 0 N
ifrii % Nco
E4
--c-:, \
�
.
•
!NEL= 6'WCEVOY
,ti11H LHEAD= MCEVOY SAFE 1TES: WELL EXCEEDS 70°@ 11241'ALL
ACTUATOR= OTIS F A 4-1/2"JEWELRY
COVERED Y 2
7/8" DTRK LNR ALL SDTRK PERFS PP&A'D
'OKB.ELEV- 56.3'
BF.ELEV 38.26, W/CMT.
KOP= 2700' 9-5/8",47#,L-80 BUTT
M _
ax Angle=100°@ 11683' TIEBACK STRN( 0 L,....„
��' —{51/2"OTIS SSSVI�D=4.562"
Litum MD= 10948' 2102' H13-3/8"FOC
Datum ND= 880(Y SS E 2297' —113-3/8"X 9-5/8"7W RN RN RKR W/TEBACK
13-3/8"CSG,68#, H 2299' / \ / 2299' —113-3/8" X 9-5/8"XO,D=8.681"
K-55 BTRS,ID=17.655" ,
18-5/8"CSG,96.5#, H 2325' GAS LFT MANDRELS
K-55 BTRS,13=17.655" ST MD ND DEV TY FE VLV LATCH SIZE DATE
1 2998 2990 15 OTIS SO RM 20 11/05/11
Minimum ID =2.372" @ 10081'
3-1/2" FL4S X 2-7/8" FL4S XO
9280' —15-1/2"OTIS X NP,D=4.562"
5-1/2"TBG,17#,L-80 PC-BTC, —{ 9282' i--
.0232 bpf,0=4.892" 9282' H BAKER FBR SEAL ASSY
9296' —19-5/8"X 41/2"BKR Fit RKR,D=4.000"
L�� 9334' —{7"NV FBR TACK(40')
9454' H9-5/8"X 7"TNV LNR HA.NGER/F KR
9-5/8"CSG,47#,N-80 SEALLOCK, —I 10005' • ,
ID=8.681"
10075' —13.75"BKR DB'LOY SLV,ID=3.00"
li 10081' —13-112"FL4S X 2-7/8"FL4S XO,D=2.372"
11041' —141/2"OTIS XA SLD SLV,D=3.813'
4-1/2",12.6#,L-80 IPC BTC. —1 11085' 1 /I 11076' HT X 4-1/2"BKR SAB RKR w/K ANCHOR,D=4.00"
.0152bpf,D=3.958" M 0.0
fl
44 6 1•,k• 11083' H4-1/2"OTIS XN NP,D=3.725"
PERFORATION SUMMARY �414�
��� / 141 11085' —141/2"WLEG,D=3.958"
REF LOG: SWR/
S GCNL 04/28/01
ANGLE AT TOP PERF: 40"@ 11120' 4444 14444
4444 ..4 MLLOUT WNDOW F-03A)11091'-11097'
Nate:Refer to Production DB for historical perf data 41
SIZE SPF WTERVAL Opn/SSHOT SQZ 444444�4'
gz �
2" 4
6 11120-11150 + 0 06/24/14 444444444444*,414�
444444
2" 6 11450-11475 0 09/01/08 444444
..............14
4/444444
2" 6 11500-11525 0 08/31/08 12289'CM TD —FISH PALLED CEP
244444441
6 11537- 11562 0 08/31/08 41444444 ` (12/17/14)
444414N
2 6 11600-11625 0 08/30/08 44444444
2 4 11670-12050 0 04/28/01 44441444444414 12280' PBTD
444444444444444 y�7,4:S
ti
4 12160-12279 0 04/28/01 4 4 4 1
44444444� �.44V
44444444444444
x.4.4.4.4.4.4.4
7"LNR,29#,N-80 SEAL-LOCK,D=6.184' —{ 11302'
2-7/8"L .6.16#,L-80 STL,.0058 bpf,D=2,372" —1 12364'
DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY UNIT
06/11/76 ORIGINAL COMPLETION 12/18/14 I I WJM) F5}-t M LEDCEP(12/17/14) WELL F-03A
06/16/89 RWO FERMT No: 201-053
08/25/89 RHO AR No: 50-029-20085-01
04/29/01 CH/KAK CTD SIDETRACK - SEC 2,T11N,R13E,2207'FSL 8 2394'FWL
03/04/10 PJC DRAWING CORRECTIONS
06/25/14 JCMJMD ADP82F/CBP(06/24/14) BP Bcploration(Alaska)
Imagl.' 'roject Well History' File Cover il ge
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
~ L- OS-~ Well History File Identifier
Organizing Ido,,~.l []
RESCAN
Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
DIGITAL DATA
/ Diskettes, No. ~.~.
[] Other, No/Type
BY:
BEVERLY ROBIN VINCENT SHER~Wr INDY
OVERSIZED (Scannable)
[] Maps:
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
Project Proofing
BY;
BEVERLY ROBIN VINCENT SHERY~JWINDY
DATE: 7//~.,~ IS/
Scanning Preparation
x30= +
BY:
BEVERLY ROBIN VINCENT SHERY~ WINDY
- TOTAL PAGES
--- /
DATE: '~ij'/63 /S/ V~'p
Production Scanning
Stage I PAGE COUNT FROM SCANNED FILE: ~
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: y YES
BY:
Stage 2
IF NO IN STAGE 1 , PAGE(S) DISCREPANCIES WERE FOUND: ~ YES
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY~ GRAYSCALE OR COLOR IMAGES )
ReScanned (i~tdiWduaf p.;z¢e [,.,.,pe, c,"al ,~ft.c, nt'/r.~,~q ,.~c~nning complex, ed)
NO
NO
RESCANNED B~': BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
General Notes or Comments about this file:
DATE: /S/
Quality Checked
12110/02Rev3NOTScanned.wpd
El IhA
07/27/10
SchIwnberger
NO. 5567
Alaska Data 8 Consulting Services Company: State of Alaska
2525 Gambol! Street, Suite 400 Alaska Oil & Gas Cons Comm
_
Anchorage, AK 99503-2838 3 Attn: Christine Mahnken
ATTN: Beth 1 t _ 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job k Log Description Date BL Color CD
P2 -16 BB6M -00027 LDL I y 3 - Lam ) ' - 07/20/10 1 1
F -03A AYKP-00096 SCMT vim.. ' ;f -- 07/22/10 1 1
BBKA -00039 USIT _Tty;BJ,]illy, - T 07/01/10 1 1
S -100 BCZ2 -00014 UsrT ?F r • ': ' O!( 07/14/10 1 1
2- 58/S -09 BCZ2 -00016 LDL i ' l 07/17/10 1 1
1- 15/P -25 AYKP -00094 LDL •-• lo, 6 07/11/10 1 1
• W -19A BCRD -00036 USIT '� 07/25/10 1 1
01 -228 AZ2F -00042 MCNL ( —r1 e 05/19/10 1 1
8 -20
AY1M-00042 RST j —f , ( /� 05/07/10 1 1
04 -20 BCRJ-00020 RST j � / ' / �j , 05/30/10 1 1
B -18 AYKP-00082 RST () _ / is L 06/02/10 1 1
05 -32A 88K5 -00040 RST — (VI 7 / 05/19/10 1 1
H -25 BCRD -00017 RST / — .0411f /f 05/10/10 1 1 I
P2 -34 AVYO -00063 - RST � 43 — OV , _3 i t 04/17/10 1 1
3 :.il U -s VI/ j 'i- -- I
1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. Alaska Data A Consulting Services
Petrotechnical Data Center LR2 -1 2525 Gambol) Street, Suite 400
• 900 E. Benson Blvd. Anchorage, AK 99503 -2838
W u _ k Ham' ..:;' " RECEIVED
Jul. 2 +3 2010
Oil A Ga
C QAt ml
Anchorage
/b
09/21/09
SahliMINIM
NO. 5372
Alaska Data Consulting Services Company: State of Alaska
2525 Gambelt Street, Suite 400 Alaska Oil Gas Cons Comm
Anchorage, AK 99503 -2838 Attn: Christine Mahnken
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job 8 Log Description Date BL Color CD
06 -09 AP3O.00052 LDL 41 7i fS0 07/21/09 1 1
Z -228 AWL8-00025 SBHP SURVEY 06/29/09 1 1
F-03A AV1H -00024 RST A 1 08/09/09 1 1
1 29/M-25 8350 -00018 RST 08/09/09 1 1
F -15A AVOO -00038 RST Z1; 09/03/09 1 1
18 -29C 09AKA0144 'OH MWD/LWD EDIT' 06/23/09 4 1
'(THIS WELL DELIVERED 09/21/09, TRANS S 4841 TO AOGCC TO MEET COMPLIANCE)
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. Alaska Data Consulting Services
Petrotechnical Data Center LA2 -1 rt 2525 Gambell Street, Surly 400
900 E. Benson Blvd. r {'1 ,�,1 OOS Anchorage, AK 99503 -2838 S
V V~~
1 °~4/~~~f ~l "~l L
.;~~, .
- _ ~-
ProActive Diagnostic Services, Inc.
To: AOGCC
Christine Mahnken
333 W. 7th Ave
Suite 100
Anchorage, Alaska 99501
(907) 793-1225
•
z„ r~.-~ i'+ :its ~.r '~ ~~1~?
..r .r l ;.3' ,,,~,.J z f E,, i~
RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MTT)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning
a signed copy of this transmittal letter to the following
BP Exploration (Alaska], Inc.
Petrotechnical Data Center
Attn: Joe Lastufica
LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
and
ao i -~~
ProActive Diagnostic Services, Inc.
Attn: Robert A. Richey
130 West International Airport Road
Suite C
Anchorage, AK 99518
Fax. (907] 245-8952
1) Coil Flag
2) Coil Flag
Signed
Print Name:
30-Aug-O8 F-03A (run 1 J
01-Sep-08 F-03A [run 2J
~~
n.l_ti_ r;-~ .~ _ ~~~~~~Q
V'
EDE
EDE
~ ~~~~
l ~~~5i
50-029-2008501
50-029-2008501
Date : Q
PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518
PHONE: (907)245-8951 FAx: (907)245-88952
E-MAIL: ~s~san~~s~r~~~s~~,°~or~l~~.~~sdsa WEBSITE:bry.~,VVV„~ta~:~z~~3s~q.~~l'
~~'.
C:\Daciunents and Settings\OwneADesktop\Tranamit_BP.doc
STATE OF ALASKA 9'~''~~ k ~ ~ ~r
ALA OIL AND GAS CONSERVATION COM~ION ~{
REPORT OF SUNDRY WELL OPERATIONS ~~"~~ ~ ~ ~nn~
1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ^ ''` $ } ~~! ~,,,
Performed: Alter Casing Pull Tubin Perforate New Pool Waiver Time Extension `~°~r ~
Shutdown ^ Perforate ~ ~ Re-enter Suspended Well ^~a~u.~C~~-.
Change Approved Program ^ Operat
.
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development ~ - Exploratory 201-0530'
3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number:
Anchorage, AK 99519-6612 50-029-20085-01-00-
7. KB Elevation (ft): 9. Well Name and Number:
56.3 KB ~ PBU F-03A
8. Property Designation: 10. Field/Pool(s): -
ADLO-028280 - PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 12364 ' feet Plugs (measured) None
true vertical 9028.97 - feet Junk (measured) None
Effective Depth measured 12298 feet s , ~~~~~~~~ ~~~ ~. ~, ~~~
true vertical 9035 feet
Casing Length Size MD TVD Burst Collapse
Conductor 110' 30" Surface - 95' Surface - 95'
Surface 2335' 18-5/8"96.5# K-55 Surface - 2325' Surface - 2325' 930 870
Production 10005' 9-5/8" 47# L-80 Surface - 1005' Surface - 8089' 6870 4760
Liner 1757' 7" 29# N-80 9334' - 11091' 7578' - 8977' 8160 7020
Liner 2289' 3-3/16X2-7/8 L-80 10074' - 12363' 8144' - 9029'
Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _
True Vertical depth: _ _
Tubing: (size, grade, and measured depth) 5-1/2" 17# L-80 SURFACE - 9282'
4-1/2" 12.6# L-80 9282' - 11085'
Packers and SSSV (type and measured depth) 4-1/2" BKR FHL PKR 9296'
7" TIW LNR HANGER PKR 9454'
4-1/2" PKR SAB PKR 11076'
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 271 14923 52 919
Subsequent to operation: SI
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory ~ Development ' - Service
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil ' - Gas WAG ~' GINJ WINJ ~ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Prebl Title Data Management Engineer
Signature Phone 564-4944 Date 9/8/2008
Form 10-404 Revised 04/2006 4 ~ ~' ~~_ ~FP ~ ZQ~B Submit Original Only '~h
F-03A
201-053
PFRF ~TT~f`HMFNT
•
Sw Name Operation Date Perf Operation Code ' Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
F-03A 4/28/01 PER 11,670. 12,050. 9,045.72 9,028.84
F-03A 4/28/01 PER __
12,160. 12,279. 9,036.76 9,036.54
F-03A 8/30/08 _ _ __
APF 11,600. 11,625. _
9,052.2 9,051.38
F-03A 8/31/08 APF 11,500. 11,525. 9,052.42 9,051.28
F-03A 8/31/08 APF 11,537. _
11,562. 9,051.15 9,051.5
F-03A 9/1/08 APF 11,450. 11,475. 9,058.13 9,054.87
AB ABANDONED PER PERF
APF
ADD PERF
_
RPF
REPERF _
BPP
BRIDGE PLUG P
ULLED
SL
SLOTTED LINER _
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL
FILL
SQF _
SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
A ~
F-03A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
ACTIVITYDATE
8/30/2008
GTU #5 w/ 1.75" OD CT. MIRU CTU. Perform partial well kill. RIH with PDS
pressure/GR/CCL memory logging toolstring. Log interval 11800' - 11300' ctmd ' _
and paint flag. Pull to surface, confirm good data, make correction of -2.5'. MU ',
and RIH with perf gun #1. Perforate interval 11600' - 11625' ELMD with
reference to SLB MCNL 28-April-2001. Perforations are 2.0", 6 SPF, 60 deg
phasing loaded with 2006 PJ HMX charges. Pull to surface. Cap BOPE and
test cap. Standby until tomorrow. Job continued on WSR 08/31/08. ';
8/31/2008'CTU #5 w/ 1.75" OD CT. Continued from WSR 08/30/08. MU and RIH with perf
:gun #2. Perforate interval 11537 - 11562' ELMD with reference to SLB MCNL
28-April-2001. Perforations are 2.0", 6 SPF, 60 deg phasing loaded with 2006
PJ HMX charges. Pull to surface. MU and RIH with perf gun #3. Perforate
'interval 11500' - 11525' ELMD with reference to SLB MCNL 28-April-2001.
'Perforations are 2.0", 6 SPF, 60 deg phasing loaded with 2006 PJ HMX
:charges. Pull to surface. Perform weekly BOPE test. Job continued on WSR
09/01 /08.
9/1/2008'CTU #5 w/ 1.75" OD CT. Continued from WSR 08/31/08. MU and RIH with
!PDS pressure/GR/CCL memory logging toolstring. Log interval 11800' - 11300'
ctmd and paint flag. Pull to surface, confirm good data, make correction of -3.5'.
MU and RiH with perf gun #4. Perforate interval 11450' - 11475' ELMD with
'reference to SLB MCNL 28-April-2001. Perforations are 2.0", 6 SPF, 60 deg
'phasing loaded with 2006 PJ HMX charges. Pull to surface. Freeze protect well
'to 2500' with 50/50 methanol/water. Hand well over to operations. RDMO. Job
'complete.
FLUIDS PUMPED
BBLS
62 1 % XS KCL
71 50/50 METHANOLM/ATER
30.4 12% HCL
EVENT SUMMARY _
SUMMARY
e
e
iZ~,
.~ t,
"",'
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LascrFichc\CvrPgs _ Inserts\Microfihn _Marlœr.doc
WELL LOG
TRANSMITTAL
ProActive Diagnostic Services, Inc.
To~
State of Alaska AOGCC
333 W. 7~Street
Suite # 700
Anchorage, Alaska 99501
RE' Distribution - Final Print(s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of'
Joey Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 1369
Stafford, TX 77497
BP Exploration [Alaska}, Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 995138
LOG DIGITAL MYLAR / BLUE LINE .REPORT
WELL DATE TYPE OR SEPIA PRINT[S} OR
CD-ROM FILM COLOR
Open Hole I 1 1
Res. Eval. CH 1 1 1
F-03 ,~ 8-11-03 Mech. CH 1
Caliper Survey
Signed ·
Print Name:
ProActive Diagnostic Services, Inc., PO Box 1369 Stafford Tx 77477
Phone:(281) 565-9085 Fax:(281) 565-1369 E-mail: pds~memorylog.com Website: www. memorylog.com
Permit to Drill 2010530
MD 12364 .,.~- TVD
DATA SUBMITTAL COMPLIANCE REPORT
41t 8~2003
Well Name/No. PRUDHOE BAY UNIT F-03A Operator BP EXPLORATION (ALASKA) INC
9029 / Completion Dat 4/29/2001 /' Completion Statu 1-OIL Current Status 1-OIL
APl No, 50-029-20085-01-00
UIC N
REQUIRED INFORMATION
Mud Log N._9o Sample N_.~o
Directional Survey _~,-I~__;~.?~_,/ _ .....
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Fmt
(data taken from Logs Portion of Master Well Data Maint)
Log Log Run
Name Scale Media No
Interval
OH I Dataset
Start Stop CH Received Number Comments
9448 12276 Case 5/29/2001 10067 9448-12276
0~ FINAL
Compensated Neutron 2 FINAL
GP,/CCL/CNL
Directional Survey FINAL
c_~tlW D Survey FINAL
9448 12276 ch 6/1/2001
9948 12276 ch 6/1/2001
OH 7/6/2001
OH 7/6/2001
10067
9448-12276 Digital Data
9948-12276 BL, Sepia
Directional Survey, Paper
Copy
MWD Survey, Digital Data
Well Cores/Samples Information:
Name
Interval
Start Stop Sent
Dataset
Received Number Comments
ADDITIONAL INFORMATION
Well Cored? Y / N
Chips Received? Y / N
Analysis Y / N
R~n~.iv~.d?
Daily History Received? Y / N
Formation Tops ,/'Y'~ N
Comments:
Compliance Reviewed By: Date:
A( STATE OF ALASKA I~i
ALASK ,.,,IL AND GAS CONSERVATION COM ,_31ON
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 201-053
,,
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20085-01
well at surface i .............. 7LOC, A~I~$[ 9. Unit or Lease Name
4.
Location
of
3072' SNL, 2886' WEL, SEC. 02, Tll N, R13E, UM ~"~' '~
..... .~ Prudhoe Bay Unit
At top of productive interval . ..~.'~;~/, ,.,
595' SNL, 1659' EWL, SEC. 12, T11N, R13E, UM
At total depth i ~,~i~' i ~ 10. Well Number
' F-03A
1089' SNL, 2636' EWL, SEC. 12, tl 1 N, R13E, UM ..'
~" ......... '~"~ 11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool
KBE - 56.30' ADL 028280
12. Date Spudded 113. DateT. D. Reached114. Date Comp., Susp., or Aband. 115. Water depth, if offshore .16. Ne. of Completions
4/19/2001 4/22/2001 4/29/2001 N/A MSL I One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD.TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost
12364 9029 FTI 12298 9035 FTI [] Yes [] NoI (Nipple) 2100' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, CNL
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT, GRADE ....TOP BOTTOM SiZE CEMENTING RECORD AMOUNT PULLED
. . ..30,, Stove .pipe cond. '"Surface ...... 95, 36,;' 250 sx Per'rn'affost II .............
18-5/8" 96.5# ....... K.55 ' Surface ' .2.325, .24,, 5300 sx Permafrost ii ...............................
9-5/8" 47# L-80 / N-80 Surface 10005' 12-1/4" 2130 sx Class 'G', 150 sx PF 'C'
................................................................
7" 29# N-80 9334' 11091' 8-1/2" 460 sx Class 'G'
3'3'16"X2-7'8" 6.2;~II/ 61~15~1 iIIII IiII I iI'lILii80 ........ ll!l~017~: IIII "Iii!l~13163",, ,," II3.i3~4"I 93 i~xl~a~lll,l~l:ll ~ iiI i ~ ...... Illll I ..... I .... I .... IIii: ..... I ....... ~ II I
241 Perforations open to Produc'tion (M,D+~'VD of Top'End ........ 25.' ............. TUBING R~=CORD ..........
Bottom and interval, size and number) SIZE ................. DEPTH SET (MD) .............. P~K'ER SET (MD)'"
2" Gun Diamter, 4 spf 5-1/2", 17#, L-80 ........ 9'296; ..... 9296' ' ......
MD TVD MD TVD '" 4-1/2", 12.6#, L-80 11085' ' ' ' 11076'
11670' - 12050' 9046' - 9029'
12160' - 12279' 9037' - 9037' 26. AC~D, FRACTURE, CEMENT SQUEEZE, FTC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
2000' Freeze Protect with MeOH
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
May 8, 2001 Flowing
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ] GAS-OIL RATIO
6/9/2001 4 TEST PERIOD 692 4,189 24 94.18I 6,056
'~'J~W Tubing Casing 'Pressure CALCULATED OIL-BBL GAS-MCF' WATER-BBL ' OIL GRAVITY-APl (CORR) ' '
Press. 24-HOUR RATE 26.2
_
_ 28. CORE DATA
'Brief description of I'itl~ol0gy, P0ros'ity, 'i~aci~'m~',"aPparent dips and presence of oil, gas or water, sub'mit ~'0r~'chips. ' ......................
RECEIVED
.
JUN 1 9 7_001
Alaska Oil & Gas Cons. Commission
_ Anchorage
Form 10-407 Rev. 07-01-80
O IGiklAL Submit In Duplicate
29. 30.
Geologic Markers Formation Tests
Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered
Depth Depth and gravity, GOR, and time of each phase.
Zone 1 B 11112' 8994'
14N 11123' 9003'
14P 11130' 9008'
TDF 11154' 9024'
13N 11184' 9042'
RECEiVEL
JUN
Alaska Oil & Gas Cons. Commissior;
Anchorage
31. List of'Attachments: ' summary Of Daily Dri'lling Reports, Surveys ..............
32. I hereby certify that the fore,going is true and correct to the best of my knowledge
Signed TerrieHubble-'""i~_''/''' ~ Title TechnicalAssistant Date
F-03A 201-053
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
O IGtiiAL
BP EXPLORATION Page 1 of 9
Operations Summary Report
Legal Well Name: F-03
Common Well Name: F-03A Spud Date: 12/14/1970
Event Name: REENTER+COMPLETE Start: 4/9/2001 End:
Contractor Name: NABORS TRANSOCEAN Rig Release: Group: COIL
Rig Name: CDR-1 Rig Number: 1
Date From-To Hours Task Sub
Code Phase Description of Operations
4/7/2001 09:00 - 18:00 9.00 MOB PRE RD CTD equipment & prepare for move. Layover coil & catwalk.
Scope-in mast & layover scissor & coil trailer. Dig-up electrical lines
from rig to camp. Prepare upright KCL & methanol tank & load on truck.
Prepare pump room #2 for move & pick with crane. Blow down steam
thoughout rig. Prepare boiler complex & load on truck.
18:00 - 21:00 3.00 MOB PRE Load catwalk on truck. Move out pumps with crane. Move out pump
mats & pits.
21:00 - 00:00 3.00 MOB PRE Set up cranes & set off coil trailer. Move out scissor sub, mats & camp.
Install gooseneck to sub.
4/8/2001 00:00 - 06:00 6.00 MOB PRE Start moving modules to F Pad. Install tugger line sheave on derrick.
Lay herculite and set mats for sub.
06:00 - 08:00 2.00 MOB PRE Spot sub & mats for scissor trailer.
08:00 - 09:00 1.00 MOB PRE Remove tugger arm at crown of mast & turn right side up. Install safety
cable.
09:00 - 11:00 2.00 MOB PRE Spot scissor trailer, tool trailer & pits.
11:00 - 13:00 2.00 MOB PRE Clean up E-07A location.
13:00 - 20:30 7.50 MOB PRE Raise scissor trailer, spot bolier complex, lay herculite & mats for mud
pumps. Spot pumps, generator set complex & catwalk.
20:30 - 00:00 3.50 MOB PRE Level coil trailer, raise tower, install floor plates, remove tugger line
guide. Raise & scope up derrick. Raise catwalk.
4/9/2001 00:00 - 03:00 3.00 MOB PRE Berm around pumps, gen& fule tank. Hook-up air, electric, fuel & mud
lines to pumps. Weld-on guide plates for snubbing table.
03:00 - 09:00 6.00 RIGU PRE ACCEPT RIG ON F-03A AT 03:00 HRS 4/9/2001. NU BOPE. Prep pits
to take return fluid.
09:00 - 14:00 5.00 RIGU PRE Changeout hydraulic orienter valve & install blankets on sunction &
discharge lines from MPs. Take on 500 KCL in pits.
14:00 - 15:00 1.00 RIGU PRE Changeout plywood in cellar area to 3/4" for better footing & install
diaper under wellhead. Reboot cyber & function tested BOPs.
15:00 - 16:00 1.00 RIGU PRE PJSM & review of new BOP test procedure for using test joint with
donut. Commence BOPE pressure test. AOGCC rep John Spalding
waived witnessing test. Grease choke manifold.
16:00 - 21:00 5.00 RIGU PRE Test choke manifold. Attempt to test stack. Suspect master valve
leaking. Call out DSM to pull BPV & install 2 way check.
21:00 - 00:00 3.00 RIGU PRE DSM pull BPV. Had 1200psi on well - suspect gas perculation. Install
TWC¥.
4/10/2001 00:00 - 04:30 4.50 RIGU PRE Pressure test BOPE as per AOGCC regulations.
04:30 - 06:00 1.50 RIGU PRE RU DSM & pull TWCV. Had 15psi on well.
06:00 - 08:00 2.00 RIGU PRE RU Otis cap with guage to monitor well. Bleed well to tiger tank.
08:00 - 10:00 2.00 RIGU PRE RU & P/T new hydraulic orienter valve, HP mud line, unit bolt on kill line
& coil. Hammer up 3" Demco for mud line.
10:00 - 11:00 1.00 RIGU PRE M/U MHA & nozzle. P/T back side lines.
11:00 - 12:00 1.00 RIGU PRE RIH to 2200' to displace out FP fluid from wellbore & coil with KCL
12:00 - 13:00 1.00 RIGU PRE POOH 1:1 @ 80%. Monitor well @ 500'- stable. LID MHA & nozzle.
13:00 - 14:00 1.00 STWHIP WEXlT R/U for M/U BHA
14:00 - 15:30 1.50 STWHIP OTHR WEXIT Wait on MWD collar.
15:30 - 16:30 1.00 STWHIP WEXIT MU cement mill BHA#1 (OAL=116.73).
16:30 - 19:30 3.00 STWHIP WEXlT RIH BHA#1. SHT @ 500' - OK. Continue RIH to EOP flag (-31'
correction). Continue RIH & tagged top of the cement at 10762'.
19:30 - 20:00 0.50 STWHIP WEXlT Had pre-operations safety meeting. Emphasised on pre-tour/job safety
metings & HNHM.
20:00 - 22:00 2.00 STWHIP WEXIT '~ Mill cement in 4-1/2" TBG from 10762' to 10935'. Had very soft cement
to 10933 (200fph ROP).
22:00 - 23:30 1.50 STWHIP WEXlT PUH to 10890' and log GR tie-in @ 30fph to 10921', (+22' correction).
Printed: 5/1/2001 10:32:21 AM
BP EXPLORATION Page 2 of 9
Operations Summary Report
Legal Well Name: F-03
Common Well Name: F-03A Spud Date: 12/14/1970
Event Name: REENTER+COMPLETE Start: 4/9/2001 End:
Contractor Name: NABORS TRANSOCEAN Rig Release: Group: COIL
Rig Name: CDR-1 Rig Number: 1
Sub
Date From - To Hours Task Code Phase Description of Operations
4/10/2001 23:30 - 00:00 0.50 STWHIP WEXlT Continue milling cement in 4-1/2" TBG from 10957'.
4/11/2001 00:00 - 00:20 0.33 STWHIP WEXlT Finish tying in w/gamma, -24' correction.
00:20 - 05:00 4.67 STWHIP WEXlT Drill cement f/10,950'-11,071.
05:00 - 06:00 1.00 S'TWHIP WEXlT Multiple stalls over 45 minute period...acts suspiciously like an x/n
nipple, but depth is 12' high.
06:00 - 09:30 3.50 STWHIP WEXlT POOH fl 1.25 deg motor. Flag EOP @ 10,000'.
09:30 - 11:00 1.50 STWHIP WEXlT Change out BHA. P/U 1.25 deg motor.
11:00 - 14:15 3.25 STWHIP WEXlT RIH, shallow hole test, OK. Continue in hole.
14:15 - 15:15 1.00 STWHIP WEXlT Tie in w/gamma, -5' correction.
15:15 - 15:45 0.50 STWHIP WEXlT Drill cement w/Iow side TF f/11,073' to 11,079'. ROP 30-35 fph w/
200-300 psi dp on motor. Cement is not extremely hard.
15:45 - 16:15 0.50 STWHIP WEXlT Flip TF to high side & drill to 11,086' See (2) hard stalls. Flip TF back to
Iow side & see (2) more hard stalls @ 11,086'. Conclude this is the true
x/n nipple.
16:15 - 17:00 0.75 STWHIP WEXlT Drill cement to 11,092' w/high side toolface, some indication of perhaps
the casing wall.
17:00 - 20:30 3.50 STWHIP WEXlT POOH BHA#2. Monitor well @ 500'- OK.
20:30 - 22:30 2.00 STWHIP WEXlT OOH. LID BHA#2. M/U window exit BHA#3.
22:30 - 23:30 1.00 STWHIP WEXlT RIH BHA#3. Shallow hole test, OK. Continue RIH.
23:30 - 00:00 0.50 STWHIP WEXlT PJSM. Service injector.
4/12/2001 00:00 - 02:00 2.00 STWHIP WEXlT Continue to RIH, tie in @ EOP flag, subtract 46'.
02:00 - 03:30 1.50 STWHIP WEXlT Tie in w/gamma, add 5' correction.
03:30 - 03:45 0.25 s'rWHIP WEXlT Orient to 60L.
03:45 - 04:00 0.25 STWHIP WEXlT RIH, tag @ 11,092', p/u & check Tr. RIH wi HS TF, tag @ 11,092,
.paint flag & p/u 1'.
04:00 - 05:00 1.00 STWHIP WEXlT Lock down brake & begin time milling sequence.
05:00 - 05:30 0.50 STWHIP WEXlT Rig pump down, orienter cycled, p/iu & reorient to HS.
05:30 - 06:45 1.25 STWHIP WEXlT RBIH, tag, p/u 1'. commence time milling, TF walked to the right,
reorient around (1) more time.
06:45 - 18:00 11.25 STWHIP WEXlT Begin time miling sequence @ 11,092', after going to 11,093',
.repainting flag & picking up to 11,092'. Lock down brake f/(1) hr & eaC~
successive 10th of a foot as per program, (Extended Time Drill \
Schedule). TF remained HS to 10-15R throughout. Significant metal ~
back. Continue milling window from 11092' to 11098' through window.
18:00 - 19:00 1.00 STWHIP WEXlT .On formation @ 11098'. TOW @ 11093' & BOW @ 11097'. Drilled
!fromation to 11108'. Pump 10 bbl biozan pill & recovered 95% cement
~& traces of formation sand.
19:00 - 22:15 3.25 STWHIP WEXlT POOH window exit BHA#3. Paint EOP flag @ 10700'. Monitor well -
'OK. Continue POOH & monitor well @ 500'- OK.
22:15 - 23:00 0.75 STWHIP WEXlT OOH. L/D BHA#3. Inspected mill - wear marks indicate that center line
was crossed.
'23:00 - 00:00 1.00 STWHIP WEXlT M/U window dressing BHA#4 with crayola mill.
4/13/2001 00:00 - 00:15 0.25 STWHIP WEXlT Continue to M/U BHA #4.
00:15 - 00:30 0.25 STWHIP WEXlT RIH, shallow hole test, OK. Pressure @ 2.5 bpm is 3500 psi,
approximately 650 psi higher than on previous run.
00:30 - 00:45 0.25 STWHIP WEXlT POOH to check BHA.
00:45 - 02:30 1.75 STWHIP WEXlT OOH, nothing amiss w/BHA. Motor tight, but able to turn w/pipe
wrench. CIO motor. Adjust Baker motor to 1.69 deg & m/u BHA.
02:30 - 04:45 2.25 STWHIP WEXlT RIH, shallow hole test, OK. Pressure still high as before, continue in
hole. Tie into EOP flag, subtract 24' correction.
04:45 - 06:15 1.50 STWHIP WEXlT Log gamma tie in, no correction.
06:15 - 07:00 0.75 STWHIP WEXlT Orient to HS, RIH, tag @ 10, 086', (x/n), ream thru, pump off & continue
~n. Tag @ 10,097'. P/U check TF, orient to HS. Run in w/pump on &
Printed: 5/1/2001 10:32:21 AM
BP EXPLORATION Page 3 of 9
Operations Summary Report
Legal Well Name: F-03
Common Well Name: F-03A Spud Date: 12/14/1970
Event Name: REENTER+COMPLETE Start: 4/9/2001 End:
Contractor Name: NABORS TRANSOCEAN Rig Release: Group: COIL
Rig Name: CDR-1 Rig Number: 1
Sub Phase Description of Operations
Date From-To Hours Task Code
4/13/2001 06:15 - 07:00 0.75 STWHIP WEXlT stall @ 10,097'. P/U & mill slowly past 10,097' w/HS toolface. Tag @
11,006'.
07:00 - 10:15 3.25 STWHIP WEXlT Dress window at HS TF, 80R & 80L. Drift thru OK @ various toolfaces.
Pump bio swep. Tag @ 11,006' & stall w/WOB (2) times.
10:15 - 14:00 3.75 STWHIP WEXlT POOH w/crayola mill. Bottoms up sample shows cement...no sand...?
7" was perfed @ exit point & cement squeezed. Will find out w/build
run.
14:00 - 15:15 1.25 DRILL PROD1 L/D crayola mill, MHA, & orienter. Adjust motor, m/u new MHA &
orienter.
15:15 - 17:45 2.50 DRILL PROD1 RIH BHA#6. Shallow hole test, OK.
17:45 - 18:00 0.25 DRILL PROD1 Log GR tie-in, (+5' correction).
18:00 - 19:00 1.00 DRILL PROD1 Orient to 30-40L. RIH tag bottom @ 11108'. Orient to HS. RIH and
attempt to drill. Had continuous stalls @ 11106' with up to 7klbs
overpull and acting like metal junk grabbing.
19:00 - 22:45 3.75 DRILL PROD1 POOH BHA#6. Reviewed overall situation and decided to RIH another
1-step diamond speed mill to munch away any possible junk obstructing
window??
22:45 - 23:45 1.00 DRILL PROD1 M/U BHA#7 with l-step diamond speed milll.
23:45 - 00:00 0.25 DRILL PROD1 RIH BHA#7.
4/14/2001 00:00 - 02:45 2.75 STWHIP WMIL WEXlT Continue in hole, shallow hole test, OK. Tie into EOP flag @ 10,700',
subtract 39'.
02:45 - 03:15 0.50 STWHIP WMIL WEXlT Orient to HS & tag @ 11,108'.
03:15 - 09:45 6.50 STWHIP WMIL WEXlT Flag & p/u 1' & go thru time milling procedure.
09:45-11:15 1.50 STWHIPWMIL WEXIT Mill by weight, mill ahead @ 20 fph f/11,121'-11,145'. Check for
departure from original wellbore ..... no departure..cement & metal in
cuttings .... no sand.
11:15 - 12:30 1.25 STWHIP WMIL WEXlT P/U to 11,080' & orient to LS. Mill down to 11,100' at various toolfaces
to clean up below TT f/underreamer.
12:30 - 15:45 3.25 STWHIP WMIL WEXlT POOH f/underreamer.
15:45 - 17:15 1.50 STWHIP WMIL WEXlT LID window mill, (center wear), motor,..chunked ..... & MWD & orienter.
P/U straight motor, underreamer, & (2) DCs.
17:15 - 19:30 2.25 STWHIP WMIL WEXIT RIH underreamer assy BHA#8. Tie into fOP flag, -33' correction.
19:30 - 00:00 4.50 STWHIP WMIL WEXIT Underreamed 7" liner from 11090' to 11125'.
4/15/2001 00:00 - 03:00 3.00 STWHIP WMIL WEXlT POOH w/under reamer. Flag EOP@ 10,700'.
03:00 - 04:00 1.00 STWHIP WMIL WEXlT L/D under reamer & DCs. M/U nozzle & FL4S extension. Inspect under
reamer, wear indicates blades opened fully & contacted bottom of tbg.
tail, OK.
04:00 - 06:45 2.75 STWHIP WMIL WEXlT RIH w/cementing nozzle, correct @EOP flag, subtract 32'.
06:45 - 07:30 0.75 STWHIP WMIL WEXlT Circulate down to 11,139' uncorrected depth.
07:30 - 09:45 2.25 STWHIP WMIL WEXlT W/O & R/U cementers.
09:45 - 10:00 0.25 STWHIP WMIL WEXIT Pre job safety meeting, emphasis on communication, safe areas,
watching for leaks & proper valve alignment.
10:00 - 11:30 1.50 STWHIP WMIL WEXIT Pump 2 bbls water & PT lines, 3800 psi, OK. Pump 10 bbls 17 ppg
class G cmt, displace w/57 bbls KCL/water. W/59 bbls out, POOH f/
11,139'6 45 fpm pumping 2.2 bpm. Decrease pump rate to 1 bpm
after entering 4 1/2" tbg. Pull to 10,500' & circulate, allow cement to
settle & start biozan downhole. CIP @ 11:30.
11:30 - 12:15 0.75 STWHIP WMIL WEXIT When biozan @ nozzle, wash down to 11,030'6 2.7 bpm.
12:15 - 16:00 3.75 STWHIP WMIL WEXIT POOH chasing cement out. Begin testing choke manifold w/POOH.
State Rep (John Crisp) notified of intent to test BOPE @ 06:45 AM &
OK'd. State Rep Jeff Jones waived witnessing test. Monitor well @ 500'
- stable.
16:00 - 17:30 1.50 STWHIP WMIL :WEXIT LID stinger & nozzle. PU swizzel stick & flush BOP stack, kill line &
Printed: 5/1/2001 10:32:21 AM
BP EXPLORATION Page 4 of 9
Operations Summary Report
Legal Well Name: F-03
Common Well Name: F-03A Spud Date: 12/14/1970
Event Name: REENTER+COMPLETE Start: 4/9/2001 End:
Contractor Name: NABORS TRANSOCEAN Rig Release: Group: COIL
Rig Name: CDR-1 Rig Number: 1
Sub Phase Description of Operations
Date From-To Hours Task Code
4/15/2001 16:00 - 17:30 1.50 STWHIP WMIL WEXIT orienter line. Clean out tees & sensators.
17:30 - 18:00 0.50 STWHIP WMIL WEXlT RU & install TWCV w/dry rod.
18:00 - 22:00 4.00 STWHIP WEXlT PJSM & review of new BOP test procedure for using test joint with
donut. Commence pressure testing BOPE.
22:00 - 00:00 2.00 STWHIP BARR WEXlT Swap liner combi rams side to side due to misalignment of the ram
guide pin.
4/16/2001 00:00 - 03:45 3.75 STWHIP WEXlT Continue testing BOPE
03:45 - 04:30 0.75 STWHIP WEXlT Pull 2 way check & L/D lubricator.
04:30 - 05:15 0.75 STWHIP WEXlT Test master valve..did not test, & test reel valve, OK.
05:15 - 06:45 1.50 STWHIP WMIL WEXlT M/U pilot hole BHA.
06:45 - 08:00 1.25 STWHIP WMIL WEXlT RIH, shallow hole & orienter test @ 3000', OK.
08:00 - 08:15 0.25 STWHIP WMIL WEXlT Pressure test cmt & tbg to 2000 psi, bled 250 psi in 10 min.
08:15 - 10:00 1.75 STWHIP WMIL WEXlT Continue in hole, correct @ EOP flag, subtract 25' correction.
10:00 - 10:30 0.50 ST'WHIP WMIL WEXlT Log gamma tie in, add 10' correction.
10:30 - 11:30 1.00 STWHIP WMIL WEXlT Tag @ 11,038', drill cement @ 60 fph to 11,065', w/2.5K WOB & 350
psi dp on motor. Cement sample left on rig very soft. Consult w/town &
Dowell lab & opt to wait (4) hrs. Lab report shows cement to be 4000
psi compressive strength @ 04:00.
11:30 - 15:30 4.00 ST'WHIP WMIL WEXIT Wait on cement .... service injector.
15:30 - 16:00 0.50 STWHIP WMIL WEXlT Drill cement to 11,085' @ 50 fph, w/2.5K WOB & 350 psi dp on motor.
16:00 - 16:30 0.50 STWHIP WMIL WEXlT Log gamma tie in, no correction.
16:30 - 17:00 0.50 STWHIP WMIL WEXlT Drill cement ramp fl 11,086'-11,091'. Drill @ 20 fph w/10-15R TF & 1K
WOB, 200-250 psi dp on motor. Notice very slight TF change to 5-10R
@ 11,091'.
17:00 - 19:30 2.50 STWHIP WMIL WEXlT POOH, flag EOP @ 10,700'. Observe well @ 500' - stable.
19:30 - 20:00 0.50 STWHIP WMIL WEXlT OOH. PJSM. LID BHA#10.
20:00 - 21:30 1.50 STWHIP WMIL WEXIT P/U window mill BHA#11.
21:30 - 23:30 2.00 STWHIP WMIL WEXlT RIH BHA#11 with pumps off. Tie into EOP flag, -20' correction.
Continue RIH and tag bottom @ 11081'.
23:30 - 00:00 0.50 STWHIP WMIL WEXlT PUH to 11066'. Bring pumps on and check TF. TF @ 150L. Orient TF
to 30L.
4/17/2001 00:00 - 00:15 0.25 STWHIP WEXlT Continue to orient to 30L.
00:15 - 00:45 0.50 STWHIP WEXlT RIH to bottom, tag @ 11,091', correct to TD...add 10'. Orient to HS, tag,
flag & P/U 1'.
00:45 - 01:45 1.00 STWHIP WEXlT Begin time milling. Lost pump prime & cycled orienter.
01:45 - 03:00 1.25 STWHIP ORNT WEXlT Orient around to HS. After 5-6 cycles, note increase in pump pressure
of 800-900 psi. No MWD signal. Suspect orienter, try bleeding &
repressuring several times, no success.
03:00 - 06:15 3.25 STWHIP ORNT WEXlT POOH, flag EOP @ 10,700'.
06:15 - 09:15 3.00 STWHIP ORNT WEXlT LID & inspect BHA. Remove top sub of orienter & note piston
unscrewed ...... cause of problems. Also note motor is weak. Call for new
motor & P/U sperry oreinter. CIO window mill as well.
09:15 - 12:15 3.00 STWHIP ORNT WEXlT RIH, correct @ EOP flag, subtract 1' correction ..... tag @ 11,091'. Tie in
w/gamma to confirm, no correction.
12:15 - 12:45 0.50 STWHIP WEXlT Orient TF to 10L, tag @ 11,091', flag pipe & P/U 1'.
;12:45 - 0.00 STWHIP WEXIT Commence time milling as per extended time milling procedure. Seeing
significant amounts of metal back before getting to flag. Motor work &
reactive .... TF steadily working over to 30L. Metal in returns. W/4'
drilled, no significant WOB ..... some question as to whether we are
getting a window.
4/18/2001 00:00 - 02:15 2.25 STWHIP WMIL WEXIT Consult w/town, decision made to start over. P/U to 11,091 & restart
window milling procedure. After 2 hrs, no motor work or reactive, or
WOB.
Printed: 5/1/2001 10:32:21 AM
BP EXPLORATION Page 5 of 9
Operations Summary Report
Legal Well Name: F-03
Common Well Name: F-03A Spud Date: 12/14/1970
Event Name: REENTER+COMPLETE Start: 4/9/2001 End:
Contractor Name: NABORS TRANSOCEAN Rig Release: Group: COIL
Rig Name: CDR-1 Rig Number: 1
Sub Phase Description of Operations
Date From-To Hours Task Code
4/18/2001 02:15 - 05:45 3.50 STWHIP WMIL WEXIT POOH to check window mill. Flag EOP @ 10,700'. Monitor well (~ 500'.
05:45 - 07:00 1.25 STWHIP WMIL WEXlT Check out window mill, wear on face indicating crossing the center line
in the casing. CIO mill, re run last one that has no wear on center of
face.
07:00 - 10:30 3.50 STWHIP WMIL WEXlT RIH, tie in @ EOP flag, subtract 42' correction.
.10:30 - 10:40 0.17 STWHIP WMIL WEXlT Log gamma tie in, add 5' correction.
:10:40 - 11:00 0.33 STWHIP WMIL WEXlT Orient TF to HS & RIH, tag @ 11,094'.
11:00 - 13:30 2.50 STWHIP WEXIT Mill 1st 10th @ 15 minutes, 2nd @ 10 & decreasing time by 1 minute w/
each tenth, seeing motor work.. 150 psi, & 5-15 degrees reactive. 1K
WOB. Mill to 11,096.5 & see some clockwise TF rotation. Stall @
11,097' (3) times.
: 13:30 - 15:00 1.50 STWHIP WEXlT Mill (formation?) @ 15 fph to 11,107'. .... (10') from BOW.
15:00 - 18:15 3.25 STWHIP WEXlT POOH, flag EOP @ 10,700', monitor well @ 500', OK.
18:15 - 19:30 1.25 STWHIP WEXlT LID window mill, some wear across center of face. P/U crayola mill &
1.75 deg motor.
19:30 - 22:30 3.00 STWHIP WEXlT Shallow hole test. OK. RIH
22:30 - 23:00 0.50 STWHIP WEXlT Tie in @EOP. -42'. Log gamma ray +5. Orient to HS. 3250 psi free
spin.
23:00 - 23:30 0.50 STWHIP WEXIT RIH pumping minimum rate. Stack out @11093.7'. Bring pumps on.
RIH @2.5 bpm. TF 15L
23:30 - 00:00 0.50 STWHIP WEXlT Try to mill through window. Stall @11091.4'. 2.5/3260/15L.
4/19/2001 00:00 - 01:30 1.50 STWHIP WEXlT Continue milling through window. Motor stall several times. Work to
10093.3. 2.5/3290/15L
01:30 - 03:00 1.50 STWHIP WEXlT ~lncrease pump rate. Stalling. Try w/pumps off. stack out @11096'.
03:00 - 04:30 1.50 STWHIP WEXIT 'Mill on window from 11090.3 to 11094.4. Broke thru. RIH to 11108.
04:30 - 07:15 2.75 STWHIP WEXlT Ream in & out of the window at various toolfaces. Drift window f/30L to
30R TF, OK. Mill 3' on bottom, no stalls.
07:15 - 10:00 2.75 STWHIP WEXlT POOH f/build assembly. Flag pipe @ 10,700' EOP. Monitor well @
500'. 7 bbls over calculated hole fill to fill hole.
10:00 - 11:30 1.50 DRILL PROD1 LID crayola mill...gauged @ 3.79". P/U M09 & build motor. CIO MHA.
11:30 - 14:00 2.50 DRILL PROD1 RIH, correct @ EOP flag, subtract 39'.
14:00 - 14:15 0.25 DRILL PROD1 Tie in w/gamma, add 6' correction.
14:15 - 14:45 0.50 DRILL PROD1 Orient to 20R.
14:45 - 17:45 3.00 DRILL PROD1 RIH, tag @ 11,111'. Drill ahead to 11,140' & confirm departure from
casing. Start FIo Pro around & drill on to 11,184'. Reactive TF is
20-30R. Orienter, (Sperry), is not cycling. Attempt to click after mud
around, no good. Drill to 11,184'.
17:45 - 20:30 2.75 DRILL ORNT PROD1 POOH f/orienter.
20:30 - 21:45 1.25 DRILL ORNT PROD1 OOH. Change out orienter. Adjust motor.
21:45 - 00:00 2.25 DRILL PROD1 Rib w/Weatherford orienter. Shallow hole test OK. RIH correct ~EOP
-46'.
4/20/2001 00:00 - 00:45 0.75 DRILL PROD1 Tie in w/gamma add 5'.
00:45 - 01:50 1.08 DRILL PROD1 Orienting.
01:50 - 03:30 1.67 DRILL PROD1 Drill ahead to 11255'. 2.5/2850/15R
03:30 - 04:45 1.25 DRILL PROD1 Wiper trip to the window. Circulate sample out.
04:45 - 07:00 2.25 DRILL PROD1 POH to change motor. Wellsite geologist confirmed top of HOT ~
8980' TVD, bottom @ 8993' TVD.
07:00 - 08:00 1.00 DRILL PROD1 CIO BHA, P/U DS49 & 1 deg motor.
08:00 - 10:30 2.50 DRILL PROD1 RIH, shallow hole test, OK. Correct @ EOP flag, subtract 43'.
10:30 - 10:45 0.25 DRILL PROD1 Log gamma tie in, no correction.
10:45 - 11:00 0.25 DRILL PROD1 RIH, thru window,..smooth, tag @ 11,257'.
11:00 - 11:15 0.25 DRILL PROD1 Orient TF to HS-15R.
11:15 - 18:00 6.75 DRILL PROD1 Drill ahead f/11,257'. ROP 120 fph, WOB 2K. Freespin 2650 psi,
Printed: 5/1/2001 10:32:21 AM
BP EXPLORATION Page 6 of 9
Operations Summary Report
Legal Well Name: F-03
Common Well Name: F-03A Spud Date: 12/14/1970
!Event Name: REENTER+COMPLETE Start: 4/9/2001 End'
'Contractor Name: NABORS TRANSOCEAN Rig Release: Group: COIL
Rig Name: CDR-1 Rig Number: 1
Sub Phase Description of Operations
Date From-To Hours Task Code
4/20/2001 11:15 - 18:00 6.75 DRILL PROD1 200-350 psi dp on motor. Inclination @ 11,257' was 84.7 degrees. 90
deg @ 11,315'..TVD 9012'. Head up to target TVD of 8975' before
entering polygon, orienting as needed. @ 11,600', TVD is 8995', angle
dropped more than expected @ 11,525', will need higher angle motor to
catch up.
18:00 - 22:00 4.00 DRILL PROD1 POH to change out motor. Plan to adjust motor to 1.5 degrees.
22:00 - 23:30 1.50 DRILL PROD1 OOH. Adjust motor.
23:30 - 00:00 0.50 DRILL PROD1 RIH w/1.69 degrees motor.
4/21/2001 00:00 - 00:30 0.50 DRILL PROD1 Shallow hole test. OK
00:30 - 01:45 1.25 DRILL PROD1 Correct @EOP -46'.
01:45 - 02:25 0.67 DRILL PROD1 Tie in w/gamma -3'. WT up 40 K. WT dwn 26k.
02:25 - 03:15 0.83 DRILL PROD1 Stack out @11568'. Wotk through spot. Shut pumps off to pass
through shales. OK. Made 100' wiper trip.
03:15 - 04:45 1.50 DRILL PROD1 Drill ahead to 11658'. 2.5/2950/HS. Project 98 degrees at the bit.
Circulate up sample & wipe area @ 11,575'.
04:45 - 07:30 2.75 DRILL PROD1 POH to adjust motor to 1 degree. Flag EOP @ 10,700'. Monitor well @
500'.
07:30 - 08:30 1.00 DRILL PROD1 Adjust motor to 1 degree.
;08:30 - 09:30 1.00 DRILL PROD1 Adjust main power pack clutch & cio hydraulic filters.
09:30 - 12:00 2.50 DRILL PROD1 RIH, shallow hole test & orienter function test @ 3000', OK. Tie into
EOP flag @ 10,700', add 24' correction.
112:00 - 12:45 0.75 DRILL PROD1 Log tie in w/gamma, add 4' correction.
: 12:45 - 13:45 1.00 DRILL PROD1 Orient & RIH to bottom. Tight spot, (shale), @ 11,582', work thru. Tag
@ 11,658'.
13:45 - 13:55 0.17 DRILL PROD1 Drill ahead f/11,658'-11,675' w/TF of 30L, 110 fph ROP. Verify
inclination heading up at 98 degrees.
13:55 - 14:15 0.33 DRILL PROD1 Orient to 90L.
14:15 - 15:00 0.75 DRILL PROD1 Drill on to 11,745' w/80-90L TF. ROP slowing down to 70 fph. 2800 psi
freespin 300 dp on motor. 37K up wt, 25K dn. 1-2K WOB.
15:00 - 15:15 0.25 DRILL PROD1 Orient to 120L to level out.
15:15 - 16:00 0.75 DRILL PROD1 Drill on to 11,786', leveling out OK.
16:00 - 16:30 0.50 DRILL PROD1 Short trip to window, no hang ups.
16:30 - 17:45 1.25 DRILL PROD1 Drill to 11884'. 2.5/3200/60L
17:45 - 18:45 1.00 DRILL PROD1 Short trip to the window. No problems
18:45 - 20:20 1.58 DRILL PROD1 Drill. Stacking out. 100' wiper. Stacking w/motor. Unable to stall out.
20:20 - 21:40 1.33 DRILL PROD1 Drill to 11957'. 2.7/3100/100L. Unable to dril w/WOB. Motor work goes
to 500 psi & stalls .... ? Suspect motor problems or washed out bleed
sub. POH to check BHA
21:40 - 00:00 2.33 DRILL BHA PROD1 POH to check out BHA. EOP flag @ 10,700'.
4/22/2001 00:00 - 01:00 1.00 DRILL BHA PROD1 Continue POH
00:50 - 02:30 1.67 DRILL BHA PROD1 Found wash out on bleed sub in the motor and some rubber on MHA.
Change out motor. MU new MHA.
02:30 - 04:45 2.25 DRILL BHA PROD1 RIH w/new motor. Shallow hole test, OK. Tie into EOP flag @ 10,700',
subtract 36' correction.
04:45 - 05:15 0.50 DRILL BHA PROD1 Tie in w/gamma -7' correction.
05:15 - 05:35 0.33 DRILL PROD1 Continue in hole, start new FIo Pro down. Tag @ 11,953'.
05:35 - 06:30 0.92 DRILL PROD1 Drill ahead to 12,025' @ 90R, 2.5 bpm/3200 psi freespin. 200-300 dp
on motor, 2-3K WOB. 38K up wt, 25K dh. ROP 100 fph.
06:30 - 06:45 0.25 DRILL , PROD1 Orient to 120L.
06:45 - 07:00 0.25 DRILL PROD1 Drill ahead to 12,048'.
07:00-08:30 1.50 DRILL PROD1 ,Drill@ 90Lto 12,097', click&drillto 12,161'@ 70L. 1 moreclick &drill
to 12,220' @ 50L. ROP 70-110 fph
08:30 - 09:30 1.00 DRILL PROD1 Short trip to window, slight motor work pulling thru 11,588' area, smooth
Printed: 5/1/2001 10:32:21 AM
BP EXPLORATION Page 7 of 9
Operations Summa Report
Legal Well Name: F-03
Common Well Name: F-03A Spud Date: 12/14/1970
Event Name: REENTER+COMPLETE Start: 4/9/2001 End:
Contractor Name: NABORS TRANSOCEAN Rig Release: Group: COIL
Rig Name: CDR-1 Rig Number: 1
Sub
Date From -To Hours Task Code Phase Description of Operations
4/22/2001 08:30 - 09:30 1.00 DRILL PROD1 going back in.
09:30 - 10:00 0.50 DRILL PROD1 Drill ahead to 12,292' @ 30-45L TF. ROP 130 fph.
10:00 - 10:45 0.75 DRILL DS PROD1 Pick up to get survey, stuck.., try relaxation technique several times
unsuccessfuly. Stack w/pump on, no motor work. Full returns, able to
orient. 20K overpull..call f/crude.
10:45 - 13:00 2.25 DRILL DS PROD1 Circulate until crude arrives. Pre job on pumping crude.
13:00 - 13:30 0.50 DRILL DS PROD1 Pump 10 bbls crude. W/5 bbls out, P/U & pull free @ 51K, (14K over
up wt.)
13:30 - 14:15 0.75 DRILL PROD1 Short trip to 11,000'. Hole smooth.
14:15 - 15:00 0.75 DRILL PROD1 Tie in w/gamma. -2'.
15:00 - 17:30 2.50 DRILL PROD1 RIH to 12292'. Orienting to 85 L.
17:30 - 18:15 0.75 DRILL PROD1 Drill to 12343' @ 2.5/3450/80L
18:15 - 19:50 1.58 DRILL PROD1 Erratic TF. Made 100' wiper. Orient to 80 L. Drill to 12363' 2.5/3500.
19:50 - 21:30 1.67 DRILL PROD1 Erratic TF. Acts like orientor not locking. Try to make it work w/o
success. POH to window Received call from town calling TD.
21:30 - 21:45 0.25 DRILL PROD1 Evacuation drill.
21:45 - 22:30 0.75 DRILL PROD1 RIH to condition well. No motor work. No stacking, well looks in good
condition.
22:30 - 23:45 1.25 DRILL PROD1 POH to made drift run. Drift OK. No problems.
23:45 - 00:00 0.25 DRILL PROD1 Pull up to gama tie in.
4/23/2001 00:00 - 00:40 0.67 DRILL PROD1 Continue pulling to tie in.
00:40 - 01:30 0.83 DRILL PROD1 Tie in w/gamma. -8'.
01:30 - 02:30 1.00 DRILL PROD1 RIH to tag bottom. TD 612364'.
02:30 - 06:30 4.00 DRILL PROD1 Lay in 25 bbls of new mud. POH. Paint EOP flags @ 8800' & 10,075'.
06:30 - 07:30 1.00 DRILL PROD1 L/D drilling BHA.
07:30 - 08:00 0.50 CASE COMP Pre job safety meeting on pumping dart.
08:00 - 09:00 1.00 CASE COMP Pump dart thru coil, 53.5 bbls coil volume. Dart OK.
09:00 - 10:00 1.00 CASE COMP Cut off weld on connector & M/U Baker slip type connector.
10:00 - 10:15 0.25 CASE COMP PJSM on running liner...stress on good communication & line of sight f/
winchline operator.
10:15 - 20:15 10.00 CASE COMP Pick up jewelry & 2 7/8" ST L liner. Making up to 1600 lbs/ft.
20:15 - 22:50 2.58 CASE COMP RIH w/2 7/8" liner, correct @ EOP flag @ 8800', subtract 24'.
22:50 - 00:00 1.17 CASE COMP Up wt 38K dnwt 24.6K. Pass through window w/o problems. RIH w/o
problems. Smooth hole. Tag up @ 12,377', (uncorrected). 37.7K up,
23.5K dn, set dn 10K on bottom. Circulating @ 2.6 bpm @ 2900 psi.
4/24/2001 00:00 - 00:30 0.50 CASE COMP Launch 5/8" ball. Pump at 2.6 bpm/2930 psi. Displace 39 bbls on coil.
Slow down to 0.4 bpm/1450 psi. Seat ball at 42.3 bbls. Shear off @
3850 psi. Release liner. PU to 26K. Stack back on 10 K. Circulate @
2.6 bpm/2750 psi.
00:30- 03:15 2.75 CASE TRAN COMP Waiting on trucks. Circulate well w/FIo-pro.
03:15 - 06:15 3.00 CASE COMP Received first load of KCI. Dipslace wel to KCL.
06:15 - 06:45 0.50 CASE COMP Pre job on cementing operation, including dart launching. Focus on
communication..action request, request acknowlegement, action
completed & final acknowledgement on all communications. Proper
valve identification & line monitoring.
06:45 - 08:00 1.25 CASE COMP Batch mix cement as pe~ procedure.
08:00 - 09:45 1.75 CASE COMP Pump 5 bbls water, pressure test lines to 4000 psi, OK. Pump 19 bbls
cement, wash up & launch dart. Displace dart, expect to latch up @
53.5 bbls. At 54.5 bbls see slight increase in pump pressure...200-300
psi...(may have been dart latching up), 12.8 bbls liner volume to landing
collar. Displace 66.3 bbls total displacement. Plug did not bump. ClP @
09:30. Estimate 1-2 bbls left in liner. Test floats 1/4 bbl back total &
floats are holding. Check to verify dart lauched, dart did launch. 1:1
Printed: 5/1/2001 10:32:21 AM
BP EXPLORATION Page 8 of 9
Operations Summary Report
Legal Well Name: F-03
Common Well Name: F-03A Spud Date: 12/14/1970
Event Name: REENTER+COMPLETE Start: 4/9/2001 End:
Contractor Name: NABORS TRANSOCEAN Rig Release: Group: COIL
Rig Name: CDR-1 Rig Number: 1
Sub Phase Description of Operations
Date From-To Hours Task Code
4/24/2001 08:00 - 09:45 1.75 CASE COMP returns throughout job, confirmed w/dedicated displacement tank.
09:45 - 13:15 3.50 CASE COMP Sting out of liner top, 30K up wt w/pump off. Pull to 50' above liner top
& break circulation. POOH circulating @ 2.5 bbls/min to bottoms up. No
cement back. Estimate TOL @ 10,080'. Estimate TOC outside liner @
10,000'. Weekly BOPE test due yesterday, kept Lou Grimaldi & Chuck
Scheve informed since Sunday AM. OK to test after running liner.
Chuck Scheve waived witnessing of test, testing choke manifold w/
POOH.
13:15 - 14:15 1.00 CASE COMP OOH, liner wiper plug still attached to liner running tool. Disassemble
tool & find dart approximately 1 1/2" from seating up in wiper
plug...(tight). Sent to Baker shop f/removal.
14:15 - 14:45 0.50 CASE COMP R/U to test BOPE. Test choke manifold. Flush stack.
14:45 - 16:00 1.25 CASE COMP Install TWC.
16:00- 16:15 0.25 CASE COMP PJSM.
16:15 - 22:00 5.75 CASE COMP Test BOPE. OK
22:00 - 23:30 1.50 CASE COMP Pull TWC.
23:30 - 00:00 0.50 CASE COMP Cut 100 ft of coil
4/25/2001 00:00 - 01:30 1.50 CASE COMP Weld coil connector. Pull test 25K/2000 psi. OK. Circulate coil.
01:30 - 02:15 0.75 CASE COMP RIH to center coil from racking back.
02:15 - 02:40 0.42 CASE COMP Put 2000 psi on liner lap for 10 minutes. Lost 50 psi.
02:40 - 03:15 0.58 CASE COMP PJSM. Stress on communication and heavy loads.
03:15 - 08:30 5.25 CASE COMP P/U motor/mill and CS Hydril.
08:30 - 11:30 3.00 CASE COMP RIH w/motor & mill.
11:30 - 12:15 0.75 CASE COMP Tag @ 12095'. Drill cement to 12137'.
12:15 - 13:00 0.75 CASE COMP Got stuck. Work pipe. Got free. Made short trip
13:00 - 15:00 2.00 CASE COMP Clean out to 12180'. Made Short trips each 15' drilled.
15:00 - 17:30 2.50 CASE FILL COMP Got stuck @ 12170'. Work pipe w/o success.
17:30 - 22:00 4.50 CASE FILL COMP Decided to pump acid. Line up acid w/Schlumberger. Inform pad
operator. Move in portable shower. Waiting on acid.
22:00 - 00:00 2.00 CASE FILL COMP Mix neutralizer ( soda ash) on pit. Pump neutralizer to tiger tank.
4/26/2001 00:00 - 02:00 2.00 CASE FILL COMP Continue pumping neutralizer to tiger tank.
02:00 - 03:00 1.00 CASE FILL COMP PJSM. stress on acid handling, communications. Review acid incident
on Nordic 1. Discuss job procedure.
03:00 - 03:30 0.50 CASE FILL COMP RU acid truck. Switch to Schlumberger pumps. Pump 2 bbls of KCI.
P/'r 64000 psi OK.
03:30 - 04:40 1.17 CASE FILL COMP Start pumping acid 61 bpm/3600 psi. Pump 10 bbls of acid. Switch
to KCI and displace to put 5 bbls of acid outside pipe.
04:40 - 05:45 1.081 CASE FILL COMP Pump 4 bbls of acid out of the pipe. Let it soak for 15 mnutes. Switch
to rig pumps. Blow down Schlumberger lines. Move 1 bbls away.
Work pipe w/o success. Move 3 bbts. Work pipe 53 K up wt. Hold up
for 5 minutes. 53 K up wt. 14 k dn wt. No success. Move last bbls of
acid out of pipe. Work pipe 53 k up wt. No success. Leave pipe on
tension 40 K.
05:45 - 08:00 2.25 CASE FILL COMP Pipe came free at 0545 hrs. Circulate acid out. POH slow to keep pipe
moving while circ out acid to outside tankage and neutralising same.
08:00 - 10:30 2.50 CASE !FILL COMP Cont POH to BHA.
10:30 - 17:30 7.00 CASE FILL COMP OOH. Stand back CSH. Change out motor and mill.
17:30 - 18:45 1.25 CASE FILL COMP RIH w/motor and mill. Pass TOL w/o problems.
18:45 - 19:15 0.50 CASE FILL COMP RIH to 11000'. 32k up wt. 23.3k dn wt.
19:15 - 22:30 3.25 CASE FILL COMP RIH to 12180'. 1.4/1600 psi. Pump 10 bbls of biozan pill.
22:30 - 23:15 0.75 CASE COMP Continue cleaning up. Made 100' short trip after clean out 15' of
cement. Pump 10 bbls of biozan each 30 minutes.
23:15 - 00:00 0.75 CASE COMP Clean out cement to 12138'. Made short trip to 12100'.
Printed: 5/1/2001 10:32:21 AM
BP EXPLORATION Page 9 of 9
Operations Summary Report
Legal Well Name: F-03
Common Well Name: F-03A Spud Date: 12/14/1970
Event Name: REENTER+COMPLETE Start: 4/9/2001 End:
Contractor Name: NABORS TRANSOCEAN Rig Release: Group: COIL
:Rig Name: CDR-1 Rig Number: 1
Sub
Date From -To Hours Task Code Phase Description of Operations
4/27/2001 00:00 - 04:40 4.67 CASE COMP Clean out cement to 12290' 1.4/2085 psi.
04:40 - 06:00 1.33 CASE COMP Made short trip to 11500'. Pump 30 bbls of Biozan. Drill out cement to
12299.5'. Continue pumping biozan pills 61.5 bpm. Had a lot of fines
on returns.
06:00 - 09:00 3.00 CASE COMP POH. EOP 67600'. Continue POH
09:00 - 13:30 4.50 CASE COMP OOH. Rack back injector. L/D motor and mill. Stand back CS Hydrill.
13:30 - 14:30 1.00 CASE COMP Test liner lap 62000/30 minutes. Lost 40 psi. Test OK.
14:30- 14:45 0.25 EVAL COMP PJSM.
14:45 - 17:00 2.25 EVAL COMP MU CNL tool. P/U 73 joints of 1 1/4" Hydrill
17:00 - 19:00 2.00 EVAL COMP RIH w/CNL tools. RIH to EOP. Correct -38'
19:00 - 21:00 2.00 EVAL COMP Log from 10000' to 10800' at 60 fpm. Slow down to 30 fpm and log to
12204'. Push down to 12248'. Pul tight 47k.
21:00 - 22:30 1.50 EVAL FILL COMP Displace well w/new KCI. Mix 50 bbls pill of biozan. Pump at maximim
rate.
22:30 - 23:30 1.00 EVAL COMP Log f/12248' to 12297'. Looks like well is clean.
23:30 - 00:00 0.50 EVAL COMP Pump perf pill and spot it in liner. Logging up.
4/28/2001 00:00 - 01:30 1.50 EVAL COMP Log from 12296' to 10000'.
01:30 - 04:15 2.75 EVAL COMP POH w/logging tools.
04:15 - 07:45 3.50 EVAL COMP Rack back injector and 1 1/4" CS Hydril. LID logging tools.
07:45 - 11:00 3.25 EVAL COMP Download memory log data and FAX to Anch for review by geologist.
11:00 - 13:00 2.00 PERF COMP Geologist verified perf intervals OK and change bottom perf depth.
Deliver guns to location.
13:00- 13:15 0,25 PERF COMP PJSM
13:15 - 17:00 3,75 PERF COMP P/U guns. MU 53 jts of CS Hydril.
17:00 - 18:00 1.00 PERF COMP RIH w/guns.
18:00 - 21:30 3.50 PERF COMP Continue RIH w/guns. Correct -57.49' 6EOP. Tagged at 12245'. Hard
tag. Tagged several times at same spot. Check & correct CSH pipe
tally. Tagging up firm on PBTD 6 12280'.
21:30 - 21:45 0.25 PERF COMP PJSM
21:45 - 23:00 1.25 PERF COMP Pump 10 bbls of FIo-pro. Drop 5/8" ball. Guns fired after 56 bbls and
2800 psi. Perforated f/11670'- 12050' and 12160'- 12279' intervals.
23:00 - 00:00 1.00 PERF COMP Pick up free - OK, POH.
4/29/2001 00:00- 02:10 2.17 PERF COMP POH
02:10 - 04:30 2.33 PERF COMP OOH. Rack back Hydrill
04:30 - 04:45 0.25 PERF COMP PJSM.
04:45 - 08:30 3.75 PERF COMP LD perfs guns and CS Hydrill
08:30 - 09:30 1.00 PERF COMP P/U nozzle to freeze protect.
09:30 - 13:30 4.00 PERF COMP Circulate out KCI. Freeze protect w/methanol 62000'.
13:30 - 14:30 1.00 PERF COMP Waiting on drillsite maintenance
14:30 ~ 15:00 0.50 PERF COMP Set BPV.
15:00 - 00:00 9.00 PERF COMP Blow down lines. Clean pits. LD coil/catwalk. Rig released. 600:00
Printed: 5/1/2001 10:32:21 AM
Obp BP Amoco
Baker Hughes INTEQ Survey Report
Company: BP Amoco Date: 611312001 Time: 15:51:25 Page: 1
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-03, True North
Site: PB F Pad Vertical (TVD) Reference: 3 · 03 1211411970 00:00 56.3
Well: F-03 Section (VS) Reference: Well (0.00N,0.00E, 135.00Azi)
Welipath: F-03A Survey Calculation Method: Minimum Curvature Db: Oracle
-.' '': ': ' 7-~':''' '-' :? ..... -' -' ':.--' - :-::'-~-~- :-'-'-:~-~:-: :-':- ' -- 7':::-:"~--: :~_:- '-:.-:'_~_~ '::~?' .-'-"::; :: ~'-.--:----'--~-'_- '_-' :T _~:'~_--_-'-_'~'T -_-;-_': _'~:'__--"-:; ~-.- -:~:?::~-.---:: ~:-:..:-----~:-
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: BGGM2001
Site: PB F Pad
TR-11-13
UNITED STATES · North Slope
Site Position: Northing: 5972527.29 ft Latitude: 70 19 55.283 N
From: Map Easting: 650960.70 ft Longitude: 148 46 31.468 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.15 deg
Well: F-03 Slot Name: 03
F-03
Well Position: +N/-S 1180.17 ft Northing: 5973727.73 ft Latitude: 70 20 6.889 N
+E/-W 1023.40 ff Easting: 651960.07 ff Longitude: 148 46 1.582 W
Position Uncertainty: 0.00 ft
Wellpath: F-03A Drilled From: F-03
500292008501 Tie-on Depth: 11090.00 ft
Current Datum: 3 · 03 12/14/1970 00:00 Height 56.30 ft Above System Datum: Mean Sea Level
Magnetic Data: 4/18/2001 Declination: 26.67 deg
Field Strength: 57476 nT Mag Dip Angle: 80.79 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
................. ff fl ft deg
0,00 0,00 0.00 135,00
Survey: MWD Start Date: 4/22/2001
Company: Baker Hughes INTEQ Engineer:
Tool: MWD,MWD - Standard Tied-to: From: Definitive Path
Annotation
Survey
11090.00 32.09 146.32 8976.30 8920.00 -2790.73 4541.41 5971029.79 656556.75 0.00 5184.61
11147.00 47.90 145.00 9019.84 8963.54 -2820.84 4562.06 5971000.10 656578.01' 27.78 5220.50
11175.00 54.20 144.90 9037,43 8981.13 -2838.66 4574.56 5970982.54 656590.87 22.50 5241.94
11198.00 62.70 142.40 9049.45 8993.15 -2854.42 4586.18 5970967.02 656602.80 38.10 5261.30
11241.00 79.80 146.00 9063.23 9006.93 -2887.35 4609,86 5970934.58 656627.14 40.54 5301.33
11274.00 86.30 148.10 9067.22 9010.92 -2914.83 4627.66 5970907.47 656645.49 20.68 5333,34
11310.00 89.50 151.90 9068.54 9012.24 -2945.97 4645.64 5970876.70 656664.10 13.79 5368.08
11345.00 91.90 155.10 9068.11 9011.81 -2977.29 4661.25 5970845.71 656680.34 11.43 5401.26
11376.00 94.00 154.10 9066.52 9010.22 -3005.25 4674.53 5970818.02 656694.18 7.50 5430.43
11410.00 96.40 150.50 9063.43 9007.13 -3035.23 4690.27 5970788.38 656710.52 12.69 5462.75
11442.00 98.50 147.40 9059.28 9002.98 -3062.41 4706.63 5970761.54 656727.43 11.63 5493.54
11480.00 96.60 143.50 9054.29 8997,99 -3093.42 4727.99 5970730.96 656749.41 11.34 5530.57
11523.00 91.30 141.00 9051.33 8995.03 -3127.33 4754.24 5970697.60 656776.34 13.62 5573.11
11559.00 88.40 137.20 9051.42 8995.12 -3154,53 4777,81 5970670.88 656800.45 13.28 5609,01
11599.00 89.40 131.60 9052.19 8995.89 -3182.50 4806.37 5970643.50 656829.57 14.22 5648.98
11640.00 96.90 128.40 9049.94 8993.64 -3208.79 4837.70 5970617.85 656861.43 19.88 5689.73
11683.00 100.30 124.90 9043.51 8987.21 -3234.17 4871,80 5970593.17 656896.03 11.28 5731.78
11713.00 98.80 121.70 9038.53 8982.23 -3250.41 4896.52 5970577.43 656921.08 11,65 5760.75
BP Amoco
Baker Hughes INTEQ Survey Report
INTEQ
Company: BP Amoco Date: 6/13/2001 Time: 15:51:25 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-03, True North
Site: PB F Pad Vertical (TVD) Reference: 3: 03 12/14/1970 00:00 56.3
Well: F-03 Section (VS) Reference: Well (0.00N,0.00E,135.00Azi)
· W.e_ll_p.a_th_:.~__.E-O .3:A_ .............................................................................. S.U~_e.y__Ca_l_c_u_la. fi_°._n_M_e_t..h.ml_.:. ...... ._Mi.n!._m_u__m__C.u__n/_a_t_u.r,e ............ _D_.b!.__o_.~!_e ..........
Survey
MD lncl Azim TVD SSTVD N/S E/W MapN MapE DLS VS
: ff deg deg ff ff ff ft ft ff deg/100ft
11743.00 98.30 117.80 9034.07 8977.77 -3265.13 4922.27 5970563.24 656947.12 12.96 5789.36
11777.00 94.10 115.40 9030.40 8974.10 -3280.25 4952.49 5970548.73 656977.63 14.21 5821.43
11815.00 90.90 111.50 9028.74 8972.44 -3295.35 4987.30 5970534.34 657012.75 13.27 5856.72
11875.00 90.30 106.20 9028.11 8971.81 -3314.73 5044.06 5970516.12 657069.88 8.89 5910.56
11912.00 90.50 103.10 9027.85 8971.55 -3324.09 5079.85 5970507.49 657105.85 8.40 5942.48
11946.00 90.40 98.90 9027.58 8971.28 -3330.57 5113.22 5970501.68 657139.34 12.36 5970.66
11977.00 90.00 94.60 9027.48 8971.18 -3334.22 5144.00 5970498.66 657170.18 13.93 5995.00
12011.00 89.60 92.90 9027.59 8971.29 -3336.44 5177.92 5970497.13 657204.15 5.14 6020.57
12056.00 86.30 93.60 9029,20 8972.90 -3338.99 5222.82 5970495.49 657249.08 7.50 6054.11
12111.00 85.70 85.10 9033.05 8976.75 -3338.37 5277.63 5970497.22 657303.86 15.46 6092.43
12158.00 85.60 78.80 9036.62 8980.32 -3331.81 5324.01 5970504.72 657350.09 13.37 6120.59
12203.00 89.10 85.50 9038.70 8982.40 -3325.68 5368.51 5970511.75 657394.46 16.78 6147.72
12243.00 91.80 84.10 9038.38 8982.08 -3322.05 5408.34 5970516.18 657434.20 7.60 6173.32
12274.00 93.80 76.70 9036.87 8980.57 -3316.90 5438.84 5970521.95 657464.59 24.70 6191.24
12305.00 93.60 76.00 9034.87 8978.57 -3309.59 5468.90 5970529.86 657494.50 2.34 6207.34
12318.00 96.00 75.60 9033.78 8977.48 -3306.42 5481.46 5970533.29 657506.99 18.71 6213.97
12364.00 96.00 75.60 9028.97 8972.67 -3295.04 5525.77 5970545.56 657551.06 0.00 6237.26
BP Amoco
Parent Wellpath:
Tie on MD:
Rig:
Ref. Datum:
V.Secflon
Angle
135.00°
WELLPATH DETAILS
F-03A
500292008501
F-03
110~0.00
3: 03 12/14/1970 00:00 56.30ft
Origin Origin Stinting
+NtiS +E/-W Frore 'FVD
0.00 0.00 0.00
REFERENCE INFORMATION
Co-ordinate (N/E) Reference: Well Centre: F-03, TrUe North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Slot - 03 (0.00N,0.00E)
Measured Depth Reference: 3: 03 12/14/1970 00:00 56.30
Calculation Method: Minimum Curvature
ANNOTATIONS
TVD MD Annotation
8920.00 11090.00 KOP
8972.67 12364.00 Projected to TD
897sm ~27113 .~47 ~
~97500 -33~8~,5 518~17 Por=l
LEGEND
-- F-03.F-03A.Plan #4
F.-03 (F-03)
-- F-03A
T
_.
Azimuths to True North
Magnetic North: 26.67°
Magnetic Field
Strength: 57476nT
Dip Angle: 80.79°
Date: 4/18/2001
Model: BGGM20Ol
-2300
-2400
-2500
-2600
-2700
--2800
~-"3~
We,path: (F-03/F-03A)
Created By: Brij PotnisDate: 6/13/2001
Contact information
Direct: (907) 267-6613
E-mail. brij potnis~.inteq ,".om
Baker Hughes IN'i' EQ. (907) 267-6600
-3200 -
! F-O3.F-03A,Plan #.4:
3300 _
~,~1 _~j.O0 - ~ Projected to TD
8500 .' ............ . . _ .
2,,
8550
\
8600-: - 'X,-- -
8650 --
-
8700 \
. ~ . . - --- . . . -3900_ - - '
~1~8750 \ .......
_
~89oo
_
-3600 _ '
3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 5000 5100 5200 5300 5400 5500 5600 5700 5800 5900 6000 6100 6200 6300 6400 6500
West(-)/East(+) [50ft/in]
.
9000 ___ ? . ~ - · Projected to
j=~9050 ....
9100 :: ---: ..... _ _
9150 .- - . -
9200 _ _ _ . - .......
_
- ! F-03 (F-03).
9250 - - --.
49505000 5050 5100 5150 5200 5250 5300 5350 5400 5450 5500 5550 5600 5650 5700 5750 5800 5850 5900 5950 6000 6050 6100 6150 6200 6250 6300 6350 6400 5450 6500 6550 6600 6650 6100 6750 6800 6850
Vertical Section at 135.00° [50ft/in]
6/13/2001 3:58 PM
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-57tl
ATTN: Sherrle
NO. 1164
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
05/29/01
Well Job # Log DeScription Date Blueline CD
Color
Sepia Prints
D.S. t-20 /~1 -/~..;/ 21229 CNTG 04108101
D,S. 2-14 - . 21233 RST 04127101
D.S. 4-01 / "7~'c'~)~-,/o~ 21134 CNTG 03104101
D.S. t5-38 I C}[/-!O~ 99050 MCNL 09119198
B-04 ) -'1 i~- O .~=,~ 21230 CNTG 0412010t
C-33A ~ (~;~-,,~ O¢~ 21058 MCNL 01128101
D-28A Ltv iC~,~,.Ol~// 21236 RST 05102/01
E-07A ~ O/-~y../ 21164 MCNL 03127101
F-03A .~)1"' ~'~,~ 21234 MCNL 04128101
F-45 /' ~t""(,~ '~' 21235 RST 05102/01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO.'
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
RECEIVED
JUN 0 1 2001
~Jaaka Oil & Gas Cons. Commis~m
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711 '
ATTN: Sherrie
TONY KNOWLES, GOVERNOR
333 W. 7~ AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Thomas McCarty
CT Drilling Engineer
BP Exploration (Alaska), Inc.
P O box 196612
Anchorage, AK 99519-6612
Re;
Prudhoe Bay Unit F-03A
BP Exploration (Alaska), Inc.
Permit No: 201-053
Sur Loc: 3072'SNL, 2886'WEL, Sec. 02,T1 IN, R13E, UM
Btmhole Loc. 1126'SNL, 2662'EWL, Sec. 12, T1 IN, R13E, UM
Dear Mr. McCarty:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Daniel T. Seamount, Jr.
Commissioner
BY ORDER OF THE CO~VIMISSION
· DATED this ' _//~-/-4~ day of March, 2001
rill/Enclosures
cc: Department offish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
,, ,I STATE OF ALASKA ,- ~/(~__.
ALASK,i' iL AND GAS CONSERVATION COM~[,.._~SION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill 1 lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen [] Service [] Development Gas [] Single Zone [] Multiple Zone
I
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 58.88' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028280
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
3072' SNL, 2886' WEL, SEC. 02, T11N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
340' SNL, 1492' EWL, SEC. 12, T11N, R13E, UM F-03A Number 28100302630-277
At total depth 9. Approximate spud date
1126' SNL, 2662' EWL, SEC. 12, T11N, R13E, UM 03/15/01 Amount $200,000.00
12. Distance to nearest property line 113. Distance toinearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028304, 2617' MDI No Close Approach 2560 12391' MD / 8963' TVDss
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 11100' MD Maximum Hole Angle 95 o Maximum surface 2144 psig, At total depth (TVD) 8800' / 3200 psig
18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Wei.qht Grade Couplin,q Len,qth MD TVD MD TVD (include sta,qe data)
3-3/4" ~,-q,~fl~' x 6.2# L-80 ST-L 2741' 9650' 7810' 12391' 8963' 112 cuft Class 'G'
,
2-7/8" ' '
~ ~,"~, ~v~j~ v I LUUI
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary Alaska Oil & Gas Cons. Commission
Total depth: measured 11320 feet .. Plugs (measured) Anchorage
true vertical 9172 feet
Effective depth: measured 11230 feet Junk (measured) Packer assembly milled and pushed to bottom
true vertical 9095 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 95' 30" 250 sx Permafrost II 95' 95'
Surface 2307' 18-5/8" 5300 sx Permafrost II 2325' 2323'
Intermediate 9987' 9-5/8" x 13-3/8" 2130 sx Class 'G', 150 sx PF 'C' 10005' 8089'
Production
Liner 11284' 7" 460 sx Class 'G' 9334' - 11302' 7578' - 9156'
Perforation depth: measured Open: 10902'- 10907', 10997'- 11002', 11040'-11050', 11068'- 11073', 11085'-11110', 11124'-11166'
Sqzd: 10951'- 10981', 10993'- 10997', 11012'- 11027', 11050'- 11068'
true vertical Open: 8818' - 8822', 8898' - 8902', 8934' - 8942', 8958' - 8962', 8972' - 8993', 9005' - 9041'
Sqzd: 8859' - 8884', 8894' - 8898', 8910' - 8923', 8942' - 8958'
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Thomas McCarty, 564-5697 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Thomas McCarty Title CT Drilling Engineer Date
"...'.;'~ :" :':i::";? "'.." ."': i." i ::i";'"i"':.:;:' :' ;'..:..:'..;~ .'.'::.. i~.;".':.:':
Permit Number_ I APINumber J Approval~Date... '" ---~ I Seecoverletter
..Z.o/ ~ ~,_~ 50- 029-20085-01 ,~ ~,,-.-.-3. /' for other requirements
Conditions of Approval: Samples Required [] Yes '~['No Mud Log Required [] Yes '1~ No
Hydrogen Sulfide Measures [] Yes,~ No Directional Survey Required '~ Yes'/~ No
Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K '~3.5K psi for CTU
Other:
D 'Taylor" seamount by order of
~Approved By Commissioner the commission Date ~..~'-',/'._~i'- ~)~/
Form 10-401 Rev. 12-01-85
ORIGINAL
Submit In Triplicate
'2001 14:04 FAX 907 564 5510 bp
' STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAO 25.005 .
l'a. Ty~e of work r3 Dri, ' i
r'l Re-Entnj [~ Redrlll lb. Type of well I'1 Service B Exploratory" I'! Stmtigraphic Test Development Oil
Deepen Development Gas [-I Single Zone Multiple Zone
~. Nam'~ of Op~rato~ 5. Datum Elevation (DF or KB) 10. field and I~ool
BP F. xplorafion (Alaska) Inc. . ~ . KBE = 58~88' Prudhoe Bay Field / Prudhoe
3. Address I ~. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-8612 ADL 028280
4~ Loc~tion of well at surface - : 7. Unit Or property Name 11. Type Bond (See 20 AAC 25.025)
3072' SNL., 2886' WEL, SEC. 02, T11N, R13E, UM p.rudhoe..Bay Unit
At top of productive interval ~. Well Number
340' 8NL, 1492' EWL, SEC. 12, T11N, R13E, UM F-03A Number 2S100302630-277
At total depth 9. ApProximate spud'date
1126' SNL, 2662' EWL, SEC. 12, T11N, R13E, UM 03/15/01 Amount $200,000.00
12. DiStance to nearest property iine ~13. Dista~ce to'nearest well 14. Number of acres i'n prol~erty :15. Proposed depth (MD and TVD)
ADL 028304, 2617' MD~ No Close Approach 2560 12391' MD / 8963' TVDss
16. To be complete~"for deviated wells ~ 17. AnticiPated Pressure {see20 AAc 25,035 (~) (2~}" '
Kick Off .D...epth 11100' MD Maximum Hole Angle 95 ° Maximum surface 2144 psig, At total depth (TVD) 8800' / 3200 psig
'18. Casi_nc,] Program Specifications Setting Depth
~fze , Top Bottom , Ou~_ntlty .of Cement
Hole Casing .~ We[qht '(~mde C~)uplin.q Length MD TVD MD TVD (include stage data) '
3-3/4" ,3.3/16" x 6.2# L-80 _ ST-L 2741' 9650~ 7810' 12391' 8963' 1 ~2 cuft ClasS 'G~ ....
2-7/8" ' ......
,,,, , , .
.......... : I I Y I:: ir-
· ~'B'"--'~m'~B----I V' L----I....~
..
,
~9. To' be completed for Reddll, Re-entry, and O,~pen Operations.
"'~'~
Present well condition summary
Total depth: measured 11320 feet , Plugs (measured) Alaska 0il & Gas Cons. commission
true vertical 9172 feet Anchorage
Effective depth: measured 11230 feet Junk (measured) Packer assembly milled and pushed to bottom
true vertical 90~5 feet
Casing Length Size Oemented MD TVD
Structural
Conductor 95' 30" 250 sx Permafrost II 95' 95'
Surface 2307' 18-5/8" . 5300 sx Permafrost il 2325' 2323'
Intermediate 9987' 9-5/8" x 13-3/8" 2130 sx Class 'G', 150 sx PF 'C' 10005' 8089'
Production
Liner 11284' 7" 460 sx Class 'G' 9334' - 11302' 7578' - 9156'
Perforation depth: measured Open: 10902'. 10907', 10997'- 11002', 11040'. 11050', 11068'- 11073', 11085'- 111 t0', 11124'- 11166'
Sqzd: 10951' - 10981', 10993' - 10997', 11012'- 11027', 11050' - 11068'
true vertical Open: 8818' - 882,?, 8898' - 8902', 8934' - 8942', 8958' - 8962', 8972' - 8993', 9005' - 9041'
Sqzd: 8859'- 8884', 8894'-8898', 8910'-8923', 8942'-8958'
20. Attachmentg'' [] Filing Fee []' i~operty Plat ~ BOP Sketch [] Div".~der Sketch BII Drilling Program'
[] Ddlllng Fluid Program I-! Time v$ Depl~ Plot [~ Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Ce,~!~,:; Engtneer N~ne/Numbec' "Thomas Mccarty, $6'~"-'5697 ' ' ' Prepared ey Na~ne/Numbec Terrie'Hubble; '564-462.8
21. I hereby certify that the ior ~ oegg~g is true an~J 'correct to the best of my knowtedge ....
Signed ThomasMcCa~'~'7"--~..~~ ~'~.~le CT Ddlling Engineer Date
I '1'' ' ' 'I'll '11 ' ' '1- .k'"7 ' ' IIi ~ [' _1_~,,.'.. I I I ' 'i . . [ ....
Perm. n Number [ CPI Numbe,,t,,,'''~- - I /~rovaI,Date ~,, ~ [ See cove[' ietter .....
I~0- 029-,,~e5-.01
[ ~"--'/,,_'~' --- U/[ for other requirements
C(~nditions of A~)provah Sar~p}Jes Re~luired ' [] Yes []
Hydr/bgen Sulfide Measures ~ Yes n No Directional Survey Required D Yes I"1 No
Reo/blred Wod<ing Pressure for BOPE ~] 2K [] 3K [] 4K [] 5K [] 10K [] 15K [] 3.5K psi for CTU
f D -~'aylo~' S,e,~"r~ou~- · by order of
Approved By Commissioner the commission Date C~ -,j~-" ~/
, , , ,
Form 10-401 Rev. 12-01-85 Submit In Triplicate
BP Alaska Drilling & Wells
F-03A Sidetrack
Summary of Operations:
F-03 has been shut in due to high GOR since late 1996. The sidetrack, F-03A, will exit the 7" liner in the
existing peris off of a cement ramp and target the Ivishak Zone 2 with a clean and optimized completion.
Existing peris will be squeezed by pumping ±10 bbls cement below and through a sliding sleeve. It will be
completed with a solid cemented and perforated 3 3/16"x 2 7/8" liner.
a e 1: Drift, set whipstock on E-Line & squeeze with service coil. Planned for I~r 27-28, 2001.
Tubing and liner drifted (12/00).
Gas lift mandrels dummied off.
Kinley caliper through tubing and liner. (12/00)
Master valve, wing valve and tree successfully tested to 5000psi.
~'~ / ~ Wellhead seals tested for integrity.
~ i Tubing integrityverified.
Service coil will squeeze ±10 bbls cement below and through sliding sleeve to shut off all existing
peris.
Service coil will mill window if time permits.
Phase 2: Mill window, Drill and Complete sidetrack: Planned for Mar. 15, 2001.
Drilling coil will be used to drill and complete the directional hole as per attached planR ECE J~'E~)
Mud Program:
· Phase 1: Seawater M,~J~ 0 ? ,2001
· Phase 2: Fie-Pro (8.6 - 8.7 ppg)
Alaska 0il & Gas Cons. Commission
Disposal: Anchorage
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program: ~ ~ $ (~r~ t · Top of 3 3/16" x 2 7/8" liner to be ±9,650 MD (-,-7,810' TVDSS), 2 7/8" will be run from TD to
approximately 11,160' MD (±8,973'TVDSS).
· The tapered liner will be cemented with approximately 20bbls of 15.8ppg cement.
Well
Control:
BOP diagram is attached.
Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
The annular preventer will be tested to 400 psi and 2000 psi.
Directional
· See attached directional plan. BHL (State Plane): 651,960; 5,973,727. Max. hole angle is 95deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging · An MWD Gamma Ray log will be run over all of the open hole section.
· A memory CNL will be run in cased hole.
Hazards
No recent H2S samples on F-03, F-Pad is not considered to be a high H2S risk area.
Lost circulation risk is Iow with the possibility for crossing small faults along the wellbore prior to
entering the polygon.
The polygon is considered a hard line due to offset faults outside the planned polygon.
Reservoir Pressure
Res. press, is estimated to be 3200 psi at 8,800'TVDss, 7.0ppg EMW. Maximum surface pressure with
gas (0.12psi/ft gradient) to surface is 2144psi.
TREE~ 6" McEVOY
WELLHEA D= Mc EV OY
'~'CTU~ATOR= oTis
KB: ELEV' = 56.26.
"'B'Fi"~E~""-: 38.26
KOP = 2375'
Max' Angie'= 51@ 7800'
~t~J~ I~D''~' ~
.......................................................................................................
Datum TV D= ?
I18 5/8",96.5~, K-55, .3027bpf, ID=I 7.655
F-03A t" ISAFETY NOTES
PROPOSED CTD HORIZONTAL SIDETRACK
2100' Id SSSV OTIS NIP, ID--4.562" I
GAS LIFT MANDRELS
Id 2325' OT~
5 1/2" TBG, 17#,L-80,.0232 bpf,ID=4.892
IMinimum ID = 3.725' 2 11083'
4 1/2" OTIS XN NIPPLE
9454'
9650' I~
10005'
[TOP OF 7"LNR
]PROPOSED TOP OF 3-3/16" Liner
19 5/8,'CSG'47#'N'80'SEALOCK'0'0732bpf'ID=8.681 I--~
9280' Id 51/2,, OTIS x NIP, ,D=4.562" I
9282' I-~ BKR PBRSEAL ASSY I
9296' I--~ 9 5/8"BKR PKR, ID- 4.00 I
H ," E C E i VE D
MAR 0 7 ZOO1
Alaska Oil & Gas Cons. Commission
Anchorage
11041' I--]4 1/2" OTIS XA SLIDING SLEEVEID=3.813 I
4 1/2" TBG TAIL,12.6#,L-80,0.0152bpf,ID= 3.958 Id
PERFORATION SUMMARY
REF LOG: SWS BHCS 01/17/71
ANGLiE'~"~'~(~"~'i ......... 133 @ 10902'
Note: Refer to Production DB for historical perf data
SEE SPF INTERVAL Opn/Sqz DATE
3 3/8 6 10902'-10907' P&A'd 03/24/96
5 4 10951'-10981' P&A'd
5 4 10993'-10997' P&A'd
4 1/8 6 10997'-11002' P&A'd 02/24/96
5 4 11012'-11027' P&A'd
5 4 11043'-11068' P&A'd
5 4 11068'-11073' P&A'd
5 4 11085'-11110' P&A'd
5 4 11124'-11166' P&A'd
11085'
IPBTD I-I 11230' I
I 7"LNR, 29#,N80,SEALOCK, 0.0371bpf, ID=6.184 Id 11302' I
I 11055' 1~4 1/2" BLAST JOINT, ID=4.00,
/BLAST JOiNTTO 11075' I
I 11076' IdT" BKRPKRW/K-22,1D=4.00ANCHOR
11083' I~ 4 1/2" OTIS XN NIP, ID=3.725 I
11085' Id 41/2"TBGTAILW/LEG I
Original Perforations P&A'd w/Cement
I 11100' I I Cement RampKOP I
I I I xo I
3-3/4" Open Hole
2-7/8" Liner Cemented & PerforatedI I 12400' I
11230'
PKR ASSY,MILLED & PUSHED TO BTM
DATE REV BY COMMENTS
7/11/2009 ORIGINAL COMPLETION
1/8/2001 SIS-MVVH CONVERTED TO CANVAS
1/15/2001! pcr proposed F-03A Sidetrack
PRUDHOE BAY UNIT
WELL: F-03A ST Proposed
PERMIT No: 170-0580
APl No: 50-029-20085-01
SEC. 02; TN 11N;RGE 13E
BP Exploration (Alaska)
CANVAS UPDATE:
BPArnoco BP Amoco
Baker Hughes INTEQ Planning Report
INFEQ
Company: BP Amoco Date: 12/1212000 Time: 16:42:55 Page: 1
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-03, True North
Site: PB F Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: F-03 Section (VS) Reference: Well (0.00E,0.00N,135.00Azi)
..... -W..,e,?p.?.._t!~.!.,.., ...P! .a..n_..~_3_~-_ .°_.3 _A. $.~..Y_ ..C.a.!~u.?_i..o.n..,M.e_t,h_o.. d: ........ _M.i.n.! ?uhm_ _.~.~.~a_~ ?. ..................... D..t~_-'._0_ra?!~ .............
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Ceo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: BGGM2000
Site: PB F Pad
TR-11-13
UNITED STATES · North Slope
Site Position: Northing: 5972527.29 ft Latitude: 70 19 55.283 N
From: Map Easting: 650960.70 ft Longitude: 148 46 31.468 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.15 deg
Well: F-03 Slot Name: 03
F-03
WelIPosition: +N/-S 1180.17 ft Northing: 5973727.73 ft Latitude: 70 20 6.889 N
+E/-W 1023.40 ft Easting: 651960.07 ft Longitude: 148 46 1.582 W
Position Uncertainty: 0.00 ft
Wellpath: Plan #3 F-03A Drilled From: F-03
500292008501 Tie-on Depth: 11100.00 ft
Current Datum: 3 ' 03 12/14/1970 00:00 Height 56.30 ft Above System Datum: Mean Sea Level
Magnetic Data: 12/12/2000 Declination: 26.78 deg
Field Strength: 57474 nT Mag Dip Angle: 80.79 deg
VerticaISection: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
0.00 0.00 0.00 135.00
Plan: Plan #3 Date Composed: 12/12/2000
Version: 1
Principal: Yes Tied-to: From: Definitive Path
Targets
................. '~':""-"~ ............ '~'-':"'=' .... : ....................................... : ........................... ~ .... ~ .................................................................. "-~ ...................................... :- ............ 7' ....................... ' ......... :-' ..... : .......................................................
..... Map Map <---- Latitude :.--> <-- Longitude --->
· Name :' ' DescriPtion TVD. i'!. +N/~S' ".+E/w Northing . Easting . 'Deg Mln · Sec' Deg Min Sec
· ..
Annotation
10978.00 8825.20 Tie-in Position
111100'001265.17 9004.908928'41 Kick off Point1 ~/t~R 072001
11432.63 8998.14 2
11582.15 8986.08 3 Alaska Oil & Gas Cons. Commission
11745.30 8978.00 4
12010,80 8975.00 5 ~13c.orage
12090.80 8972,39 6
12390.78 8963.01 TD
Plan Section Information
MD . Incl Azim TVD +N/-s +E/-W DLS Build Turn TFO Target '
ft deg deg ' ft ft' ·. ft deg/100ft deg/100ft'deg/100ft' deg . .
10978.00 32.25 146.00 8825.20 -2741.20 4508.20 0.00 0.00 0.00 0.00
11100.00 32.19 146.12 8928.41 -2795.17 4544.52 0.07 -0.05 0.10 133.21
11265.17 90.00 146.12 9004.90 -2910.18 4621.75 35.00 35.00 0.00 360.00
11432.63 94.60 130.00 8998.14 -3034.23 4733.16 10.00 2.75 -9.63 286.16
11582,15 94.60 145.00 8986.08 -3143.79 4833.55 10.00 0.00 10.03 89.40
11745.30 91.04 128.86 8978,00 -3262.40 4944.47 10.12 -2.18 -9.89 -101.98
12010.80 90.23 101.83 8975.00 -3375.00 5182.17 10.18 -0.30 -10,18 -91.52
12090.80 93.50 94.44 8972,39 -3386.31 5261.26 10.10 4.09 -9.24 -66.05
BPAmoco
· ..-,-, BP Amoco
INTEQ Planning Report
INTEQ
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-03, True North
Site: PB F Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: F-03 Alaska Oil & Gas Cons, Cor~rnission Section (vs) Reference: Well (0.00E,0.00N,135.00Azi)
.........Wellpath! _p!_an_.~3_?.:,.o_3.A_. Anchorage Survey Calculation Method: Minimum Curvature Db: Oracle
Plan Section Information
MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg
.........................................................................................................................................................................................
12390.79 90.00 64.47 8963.00 -3332.00 5552.63 10.05 -1.17 -9.99 -96.04
Survey
MD lncl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ft deg deg ft ft ft ft ft deg/100ft ft deg
10978.00 32.25 146.00 8825.20 -2741.20 4508.20 5971078.63 656522.55 0.00 5126.10 0.00 MWD
11000.00 32.24 146.02 8843.81 -2750.93 4514.76 5971069.04 656529.30 0.07 5137.62 133.21 MWD
11025.00 32.24 146.02 8864.95 -2761.99 4522.21 5971058.13 656536.98 0.00 5150.71 0.00 MWD
11050.00 32.24 146.02 8886.10 -2773.05 4529.65 5971047.23 656544.64 0.00 5163.79 0.00 MWD
11075.00 32.20 146.10 8907.26 -2784.11 4537.09 5971036.32 656552.30 0.22 5176.87 133.19 MWD
11100.00 32.19 146.12 8928.41 -2795.17 4544.52 5971025.41 656559.95 0.07 5189.94 133.13 MVVD
11125.00 40.94 146.12 8948.47 -2807.52 4552.81 5971013.23 656568.49 35.00 5204.54 360.00 MWD
11150.00 49.69 146.12 8966.03 -2822.26 4562.71 5970998.69 656578.69 35.00 5221.97 360.00 MWD
11175.00 58.44 146.12 8980.69 -2839.05 4573.99 5970982.14 656590.30 35,00 5241.81 360.00 MWD
11200.00 67.19 146.12 8992.10 -2857.50 4586.37 5970963.95 656603.05 35.00 5263.61 360.00 MWD
11225.00 75.94 146.12 9000.00 -2877.17 4599.58 5970944.55 656616.66 35.00 5286.86 360.00 MWD
11250.00 84,69 146.12 9004.20 -2897.61 4613.30 5970924.40 656630.79 35.00 5311.02 360.00 MWD
11265.17 90.00 146.12 9004.90 -2910.18 4621.75 5970912.00 656639.49 35.00 5325.88 0.00 MWD
11275.00 90.27 145.18 9004.88 -2918.30 4627.30 5970904.00 656645.20 10.00 5335.54 286.16 MWD
11300.00 90.97 142.77 9004.61 -2938.51 4642.00 5970884.09 656660.31 10.00 5360.23 286.16 MWD
11325.00 91.66 140.37 9004.03 -2958.09 4657.53 5970864.83 656676.23 10.00 5385.06 286.13 MWD
11350.00 92.35 137.97 9003.16 -2976.99 4673.86 5970846.26 656692.94 10.00 5409.97 286.08 MWD
11375.00 93.04 135.56 9001.98 -2995.19 4690.97 5970828.42 656710.41 10.00 5434.93 285.99 MWD
11400.00 93.72 133.15 9000.50 -3012.63 4708.81 5970811.34 656728.60 10.00 5459.88 285.88 MWD
11425.00 94.40 130.74 8998.74 -3029.30 4727.36 5970795.05 656747.48 10.00 5484.78 285.74 MWD
11432.63 94.60 130.00 8998.14 -3034.23 4733.16 5970790.24 656753.38 10.00 5492.37 285.57 MWD
11450.00 94.62 131.74 8996.74 -3045.56 4746.25 5970779.18 656766.70 10.00 5509.64 89.40 MWD
11475.00 94.63 134.25 8994.73 -3062.55 4764.48 5970762.56 656785.26 10.00 5534.54 89.54 MWD
11500.00 94.64 136.76 8992.71 -3080.32 4781.94 5970745.15 656803.08 10.00 5559.46 89.74 MWD
11525.00 94.64 139.27 8990.69 -3098.84 4798.61 5970726.97 656820.12 10.00 5584.34 89.94 MWD
11550.00 94.63 141.78 8988.67 -3118.08 4814.45 5970708.07 656836.35 10.00 5609.14 90.15 MWD
11575.00 94.61 144.28 8986.66 -3137.98 4829.43 5970688,47 656851.73 10.00 5633.81 90.33 MVVD
11582.15 94.60 145.00 8986.08 -3143.79 4833.55 5970682.75 656855.96 10.00 5640.83 90.53 MWD
11600.00 94.22 143.23 8984.71 -3158.21 4843.98 5970668.54 656866.68 10.12 5658.40 258.02 MVVD
11625.00 93.69 140.75 8982.98 -3177.86 4859.34 5970649.21 656882.44 10.12 5683.16 257.88 MWD
11650.00 93.15 138.27 8981.49 -3196.83 4875.54 5970630.57 656899.02 10.12 5708.03 257.71 MWD
11675.00 92.60 135.80 8980.24 -3215.11 4892.56 5970612.65 656916,40 10.12 5732.98 257.57 MWD
11700.00 92.05 133.33 8979.23 -3232.63 4910.35 5970595.49 656934.54 10.12 5757.96 257.44 MWD
11725.00 91.49 130.86 8978.45 -3249.38 4928.89 5970579.12 656953.42 10.11 5782.91 257.37 MWD
11745.30 91.04 128.86 8978.00 -3262.40 4944.47 5970566.42 656969.26 10.11 5803.13 257.30 MWD
11750.00 91.03 128.38 8977.92 -3265.33 4948.14 5970563.56 656972.99 10.18 5807.80 268.48 MWD
11775.00 90.96 125.84 8977.48 -3280.41 4968.07 5970548.89 656993.22 10.18 5832.56 268.47 MVVD
11800.00 90.89 123.29 8977.08 -3294.59 4988.66 5970535.13 657014.08 10.18 5857.14 268.43 MWD
11825.00 90.82 120.75 8976.71 -3307.85 5009.85 5970522,31 657035.54 10.18 5881.50 268.39 MWD
11850.00 90.74 118.20 8976.37 -3320.15 5031.61 5970510.45 657057.54 10.18 5905.58 268.35 MWD
11875.00 90.67 115.66 8976.06 -3331.47 5053.89 5970499.59 657080.05 10.18 5929.35 268.31 MWD
11900.00 90.59 113.12 8975.79 -3341.79 5076.66 5970489.73 657103.02 10.18 5952.74 268.28 MWD
11925.00 90.51 110.57 8975.55 -3351.09 5099.86 5970480.90 657126.40 10.18 5975.73 268.25 MWD
11950.00 90.43 108.03 8975.34 -3359.35 5123.45 5970473.12 657150.15 10.18 5998.25 268.23 MWD
11975.00 90.35 105.48 8975.17 -3366.56 5147.39 5970466.40 657174.23 10.18 6020.27 268.21 MWD
12000.00 90.27 102.94 8975.04
12010.80 90.23 101.83 8975.00
12025.00 90.81 100.52 8974.87
-3372.70 5171.62 5970460.75 657198.58 10.18 6041.75 268.19 MWD
-3375.00 5182.17 5970458.66 657209.17 10.29 6050.83 267.90 MWD
-3377.75 5196.10 5970456.20 657223.15 10.10 6062.63 293.95 MWD
BPAmoco BP Amoco
Baker Hughes INTEQ Planning Report
INTEQ
Company: BP Amoco Date: 12/12/2000 Time: 16:42:55 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-03, True North
Site: PB F Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: F-03 Section (VS) Reference: Well (0.00E,0.00N,135.00Azi)
..... ...................................................................................................................... ..............e_ .......................
Survey
MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ft deg deg ft ft ff ff ff deg/100ff ft deg
12050.00 91.84 98.21 8974.29 -3381.82 5220.76 5970452.63 657247.89 10.10 6082.94 293.94 MWD
12075.00 92.86 95.90 8973.27 -3384.89 5245.55 5970450.06 657272.73 10.09 6102.64 293.92 MWD
12090.80 93.50 94.44 8972.39 -3386.31 5261.26 5970448.96 657288.47 10.09 6114.76 293.83 MWD
12100.00 93.40 93.52 8971.84 -3386.95 5270.42 5970448.51 657297.64 10.05 6121.68 263.96 MWD
12125.00 93.13 91.02 8970.41 -3387.93 5295.36 5970448.03 657322.59 10.05 6140.02 263.90 MWD
12150.00 92.86 88.52 8969.10 -3387.83 5320.32 5970448.63 657347.54 10.05 6157.60 263.76 MWD
12175.00 92.58 86.02 8967.92 -3386.64 5345.26 5970450.33 657372.46 10.05 6174.39 263.63 MWD
12200.00 92.29 83.52 8966.86 -3384.36 5370.14 5970453.11 657397.27 10.05 6190.37 263.51 MWD
12225.00 92.00 81.02 8965.92 -3381.00 5394.89 5970456,97 657421.95 10.05 6205.49 263.41 MWD
12250.00 91.70 78.52 8965.12 -3376.57 5419.48 5970461.90 657446.44 10.05 6219.74 263.31 MWD
12275.00 91.41 76.03 8964.44 -3371.06 5443.85 5970467.90 657470.70 10.05 6233.09 263.23 MVVD
12300.00 91.11 73.53 8963.89 -3364.50 5467.97 5970474.95 657494.68 10.05 6245.50 263.16 MWD
12325.00 90.80 71.04 8963.47 -3356.90 5491.78 5970483.03 657518.32 10.05 6256.96 263.11 MWD
12350,00 90.50 68.54 8963.19 -3348.26 5515.23 5970492.14 657541.60 10.05 6267.44 263.07 MWD
12375.00 90.19 66.05 8963.04 -3338.62 5538.30 5970502.25 657564.46 10.06 6276.92 263.02 MVVD
12390.79 90.00 64.47 8963.00 -3332.00 5552.63 5970509.16 657578.66 10.06 6282.38 263.00 MWD
RECEIVED
0 7 001
Alaska Oil & Gas Co~s. Commission
Anchorage
BP Amoco
WELLPATH DETAILS
Plan #3 F-~3A
500292008501
Parent Wellpath: F-03
Tie on MD: 11100.00
Vertical Section Origin: Slot -03 (0.00,0.00)
Vertical Section Angle: 135.00°
Rig:
Depth Reference: 3: 03 12J1411970 00:00
BPAmoco
Co-ordinate (N/E) Reference: Well Centre: F-03, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Slot - 03 (0.00,0.00)
Measured Depth Reference: 3: 03 12/14/1970 00:00 56.3
Calculation Method: Minimum Curvature
ANNOTATIONS
No. TVDMD Annotath3n
1~8825.20 10978.00 Tle4n Pos~on
8928.41 11100.00 1Kic~offPeinl
3 9~4.90 11265.17
4 8998.14 11432.63 2
658986.08 11582.15 43
8978.01 11745.30
8~72.3~ 12000.~0
0 8003.0~ ~230~.78 ID
LEGEND
F~3(F-03)
Pbn#3F~3A
T
Azimuths to True North
Magnetic North: 26.78*
Magnetic Field
Strength: 57474nT
Dip Angle: 80.79°
Date: 12/12_/2000
Model: BGGM2000
We~path: (F-O3/Pfan ~3 F.O3A)
Created By: I~j Po~'~ Date: 12/t2/2000
REFERENCE INFORMATION '~ -:'~":"~'"'"'-' ' ' ~ · X'C..i..:..,- .¢.
-28oo-..~ ;'.;.'.i.'.
.
'"N, ·"
......... _29oq
,"~,,~.,~ '"" .... ~ :~ --~ :.:'.:.i::. :.:.!' !'i !';: : %- :.
~ !i ':':':":'.:'~;!' 2' %',%.. : :":':';"
'~'-3000'-~'' '~~~' '-','% ' ~:"'::.'!:::'~"¢'"";'" '(~' :'~' '~' ............... ! .............. ! ............ ~ ............ ¢ ......... : ....... ! ......... ! ........ " : :."
~ .4 '...--:-.[-:..;..'. : \ %. I~1...-.:...-.:-: '~ .. ~'--:~-: .- . : : : : : ; '. '
· !' 4 -: ~ :.: -' ' "'"~~ ~:::. :'::: ..:::U"::'
~'-505o~"::-'!-:~":-4'"'-?':"!:
~1~ -3100'~f ~ · .-;.:;. :; ::;. :i .';. ': .?~ :i~!-i.i.!: -:i. :'i-? i!:i'I' "
~ .'*?":";:":'":" . . ' . ' ..... .- ; .
~ -'.'· :.:::i:.: ' ' .~.~ ..' ~'-' ~ · ...;.. .~ ............ i ........... ; ......... i....:....~ ~ .... i · - '
,~-3150'-~."¥~?~'¥'?' ¥- ' ~ i ~-..~'~.' ".i-~ '~' . :. :i'!
· ~ ~ .:;.;:;;~';:.- ' . ""h'"'-.~ ::
~-3200'-~~' ::i::!::
~ .~ ::'..:-.: :.:::.''.-:; . -: .... .. . · . .
-- 0 ~ -:~:::;<" - ' : .'..i..!.::...--"'[:' "~ ....... -!" . ...... ~: ...... ' ' ' '
..: .....
-3300'_i' :!"t' ' '?';
-34oo-, ':.' ~":-'-':..":. ............... · ......... i'"'
4 .... i'" · ' .:.:i.'....!" ; -..~. - ; ' ; ~ ; ; : :, ; i i ;
q · !. - ; ' "~ :':":'~".. - ' _' Z
' -3450'":: · '-:"%~"~'?:: ...... - ' '?".'":'77:' ........... ~'"'7'7'"'~'"":'"'""~". ; .... "'~ '~ ......... : ...................... ! .... '. ' !"~ '
...I'._;:;...; : . : .:.~:.-.:~ ': := ' ';- ; · . ' ~ ; ; ; ; ; ; ; ·
-3500'-q· . -}-*h?';.:'i..t.'f:'!: ........ · ' ' :"::'""~:::;¥:'.';'~'.'~':H'7.'¢:'.::'i;t';i'i'
440044504500455046004650 47004750 48004850 4900 4950 5000 5050 5100 5150 5200 5250530053505400545055005550560056505700
West(-)/East(+) [5Oft/in]
...- ........
. :-.~ ~--~. ~.:
...........
........
....
'..'b-.' ~ , '"'":",,;;.:,,*" . ;: ',. : : ! i : ~ o
"
· ' :':?:~"i':i'::,:';"i':
~".'""':' :' ~" ' -. · } · ': i ' ';; { '_.; '; : · ,,. - ..: .............. :;4:-::,::i.:;:;:.;. . ~. ........ ·
4850 4900 4950 5000 5050 5100 5150 5200 5250 5300 5350 5400 5450 5500 5,~50 56~0 5650 5¢00 57'50 5800 5850 5(,,-~)0 5950 6000 6050 6100 6150 6200 6250 6300 6350 6400 6450 6500 6550 6600 6650 6700 6750
Vertical Section at 135.00' [50ft/in]
.%..-.?.-:.-.:
..... ..
· .. '.' .:.... v.
'C?T:'~":
:..
m
Plot 12/12/2000 4:52 PM
CDR1
Drilling Wellhead
F-03a
tail
21.10'
16
19.30'
Rig Floor
5.59'
~0'~
Shaffer Dual
T.O.T. 5,000 psi W.P.
R~_~ Type Dual Gate BOPE
~ CT Injector Head
Otis Q.C. thread half
Traveling plate
5-1/2" lubricator
Jacking Frame
Top Stationary Plate
Annular BOP
(Hydril),7-1/16" ID
Annular BOP
(Hydril),7-1/16" ID
Top blind / shearI
Bottom 2 3/8" ,~
Variable pipes
Kill Line
I Top 2 7/8" pipe / slips
Btm 2 3/8" pipe/slips
Manual Master Valve
Tubing Hanger
9-5/8" Annulus
0.66'
~ Matt
Ground Level
13-3/8" Annulus
~/~R 0 7 ~001
Alaska Oil & Gas Cons. Commission
Anchorage
F-03A Revidsed Completion
Subject: F-03A Revidsed Completion
Date: Tue, 13 Mar 2001 16:18:33 -0600
From: "McCarty, Thomas M" <McCartTM@bp.com>
To: "Tom Maunder (E-mail)" <Tom_maunder@admin.state.ak.us>
Tom:
As we have discussed: F-03a will be completed with 2-7/8" liner instead of
the originally proposed 3-3/16" x 2-7/8" tapered string. In this case, this
solution seems to be the best compromise.
Tom, feel free to give me a call if you need any other info .... if you
cannnot reach me at my desk feel free to try my cell at 240-8065.
Regards,
Thomas McCarty
Coil Tubing Drilling Engineer
Alaska Drilling & Wells
Office: 907-564-5697
Cell: 907-240-8065
I of 1 3/13/01 1:31 PM
BP.EXPLORATION (ALASKA).,: .INC,
RO.":'BQX; 196612 -.:.~.. . '"~:.,' :
ANCHORAGE, .ALAS~:' 99519-6612
':?.: :.,.: ' ....... : ....
:' :" ~;~t '''
:
PAY
FIRST NATIONAL.BANI( .OF ASHEAND
· ;~NiAEFILIATE, OF :':'. '
NATION,a~'CITY BANK
CLEVELAND, OHIO
"' '"":~8-389.' 412
No,. H i80965
CONS(~L!DAT[ED ~OMMERCIAL ACCOUNT
:' . .'::i. ·"
O0180965
oNE".: ED;i!: &;::=. / 1 ~..~..~..~;~.~.~..~.~~.x~:~:.~-x..~.x..~.~.~.~..~:`.~.~:~..~-~:.~ ..US:::: DOLLAR
AK 99501
ANCHORAGE
DATE . " ..'::,::':.:AMOUNT
.... ' i:i :. NOll:iYALID AFTER 120 DAYS. ' ......
· , ....:.,. . .. ': '.,:,,LJ.. :::::!::i":...,:
DATE ) C.EC,< NO.
H ! 8 0 9 6 5 i2/28/ooI .
00180965
VENDOR ALASKAOILA O0
........ nl--nwr~nu ~ I.-n vv
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
122100 CKi22iOOE i00. O0 i00. O0
PYMT ;OMMENTS- Peenit To D~ill
HANDLING INST' S/H - Ter~-ie Hubi:)le X4628
~,~ .. ~ ~ '"., ,.,C. ...... 'I','
! ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. ~ 100- O0 1 OO, OO
WELL PERMIT CHECKLIST COMPANY
FIELD & POOL G ~ ~;)/' .F~"7
INIT CLASS
ADMINISTRATION
. WELL NAME ._~'-d3_~ ~ PROGRAM: exp
GEOL AREA
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available' in drilling unit ............
8. If deviated, is wellbore plat included ............. ...
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can.be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
ENGINEERING 14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
DATE 26.
~ 27.
28.
20.
Conductor string provided ...................
Surface casing protects all known USDWs ...........
CMT vol adequate to circulate on conductor & surf csg .....
CMT vol adequate to tie-in long string to surf csg ........
CMT will cover all known productive horizons ..... .....
Casing designs adequate for C, T, B & permafrost .......
Adequate tankage or reserve pit .................
If a re-drill, has a 10-403 for abandonment been approved...
Adequate wellbore separation proposed ....... : .....
If diverter required, does it meet regulations ..........
Drilling .fluid program schematic & equip list adequate .....
BOPEs, do they meet regulation ................
BOPE press rating appropriate; test to "~;(~r~. psig.
Choke manifold complies w/APl RP-53 (May 84) .........
Work will occur without operation shutdown ...........
Is presence of H2S gas probable .................
dev ,.~ redrll .. ~ serv
~?/~ UNIT# I
i N
Y'N
Y N
Y N
Y N
wellbore seg.
ann. disposal para req
ON/OFF SHORE
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures ...... Y N .~/ ·
31. Data presented on Potential overpressure zones ....... Y ~'/
32. Seismic analysis of shallow gas zones ..........
33. Seabed condition survey (if off-shore)... ..........
34. Contact name/phone for weekly progress reports [exploratory on, n,n~] Y N
ANNULAR DISPOSAL35. With proper cementing recOrds, this plan
(A) will contain waste in a sUitable receiving zonei ....... Y N
APPR DATE . (B) will not contaminate freShwater; or cause drilling waste... Y N
to surface; ' '
(C) will not impair mechaniCal integrity of the well used for diSposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412, Y N
GEOLOGY: ENGINEERING:. UlC/Annular COMMISSION:
Comments/Instructions: