Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-089 • • BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 .; Post Office Box 196612 Anchorage, Alaska 99519 - 6612 December 20, 2010 witONED Mr. Tom Maunde ° �a *Xx n � Alaska Oil and Gas Conservation Commission 333 West 7 Avenue �'' di z 41^ Anchorage, Alaska 99501 n ut erns. L4.. asion Subject: Corrosion Inhibitor Treatments of GPB Y Pad 0q0 6)64 Mr. Maunder, i,574 Enclosed please find multiple copies of a spreadsheet with a list of ells from Y Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 12 /20/10 Corrosion Well Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal Y -01B 2010760 50029203940200 NA 2.5 _ NA 8.50 4/11/2010 Y - 02A 2011730 50029203950100 NA 0.1 NA 0.85 4/11/2010 Y - 03A 2042350 50029204110100 NA 2.2 NA 18.70 4/16/2010 Y - 04 1791050 50029204230000 NA 1 NA 5.10 4/11/2010 Y -05B 2081380 50029204360200 NA 3.3 NA 20.40 4/15/2010 Y -06A 2042510 50029204310100 NA 0.7 NA 3.40 4/16/2010 Y -07A 2071050 50029205600100 14.5 2.0 0.3 NA 1.70 8/4/2010 Y -08A 1880560 50029205720100 NA 4 NA 15.30 8/5/2010 Y - 09A 1970830 50029205790100 19 1.5 3.6 NA 17.00 8/4/2010 Y -10A 2042500 50029205870100 19 3.0 8.75 NA 54.40 8/6/2010 Y -11 C 2051640 50029205130300 NA _ 0.1 NA 0.90 4/14/2010 Y - 13 1811120 50029206340000 NA 0.4 NA 3.40 4/15/2010 Y -14B 2011010 50029218320200 NA 3.8 NA 20.40 4/10/2010 Y -15A 2010890 50029209400100 NA 2.1 NA 11.90 4/10/2010 Y - 16 1830490 50029209320000 18.8 2.0 1.7 NA 10.20 8/4/2010 Y - 18 1830290 50029209160000 NA 0.8 NA 5.10 4/9/2010 Y -19 1880960 50029218570000 NA 0.2 NA 0.85 4/15/2010 Y - 20A 2010250 50029215870100 NA 1.5 NA 11.90 4/14/2010 Y - 21A 1950370 50029215740100 NA 0.1 NA 1.70 4/13/2010 Y - 22A 1881150 50029215580100 _ NA 0.5 NA 3.40 8/4/2010 Y - 23B 2031640 50029215900200 NA 1.2 NA 6.80 4/13/2010 Y -24 1861130 50029216080000 NA 1 NA 6.80 4/12/2010 Y - 25A 2081400 50029218830100 NA 0.3 NA 1.70 4/18/2010 Y - 26A 2010430 50029221910100 NA 0.3 NA 1.70 4/15/2010 Y -27 1900280 50029220190000 NA 0.5 NA 3.40 4/14/2010 Y - 28 1910650 50029221690000 NA 3.5 NA 28.90 4/12/2010 Y - 29A 1960910 50029221230100 NA 0.2 NA 1.70 4/13/2010 Y -30 1910150 50029221350000 NA 0.5 _ NA 2.60 4/13/2010 Y -31 1910560 50029221610000 NA 0.5 NA 3.40 4/12/2010 Y - 32 1910410 50029221490000 NA 0.3 _ NA 1.70 4/18/2010 Y -33 1910300 50029221440000 NA 0.9 NA 6.80 4/12/2010 Y - 34A 1990040 50029221780100 NA 0.9 NA 5.10 4/11/2010 Y -35A 2022370 50029221860100 NA 1.5 NA 10.20 4/15/2010 Y - 36 1931310 50029224000000 NA 0.9 NA 5.95 4/10/2010 Y -37A 2020460 50029224030100 NA 0.8 NA 6.00 4/14/2010 e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfihn _ Marker. doc Permit to Drill 2010890 DATA SUBMITTAL COMPLIANCE REPORT 7/3012003 Well Name/No. PRUDHOE BAY UNIT Y-15A Operator BP EXPLORATION (ALASKA) INC APl No. 50-029-20940-01-00 MD 12019 ' 'l-VD 8948 -~-' Completion Dat 7/8/2001 ~' Completion Statu 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log N_.g_o Sample No Directional Survey ~ .k/__.4,'~~ .... DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt Log Log Run Name Scale Media No Interval Start Stop (data taken from Logs Portion of Master Well Data Maint) OH / Dataset CH Received Number Comments ED ,/.~"~' Ver LIS Verification ,L-- L 1 'Co~mpensated NEU/GR 2 FINAL ~ FINAL ~--Directional Survey FINAL ---~- Directional Survey FINAL 9600 11949 Case 8/3/2001 10146 12041 Open 5/6/2002 9600 11949 ~ c ,-~ 8/3/2001 9600 11949 CH 8/3/2001 ch 9/7/2001 ch 9/7/2001 ~_..Q222 9600-11949 9600-11949 BL, Sepia 9600-11949, Digital Data Directional Survey Digital Data Directional Survey _ Well Cores/Samples Information: Name Interval Start Stop Sent Received Dataset Number Comments ADDITIONAL INFORMATION Well Cored? Y / N Chips Received? Y / N Analysis Y / N R~.n~.iv~.d ? Daily History Received? Y / N Formation Tops ~/N Compliance Reviewed By: Date: ALASKA OIL AND GAS CONSERVATION GOMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: ADD PERFS 2. Name of Operator Operation shutdown_ Stimulate _ Pull tubing _ Alter casing _ 5. Type of Well: luggingJ~laska epair w'elf_ 6. Datum elevation BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 514' FNL, 4680' FEL, Sec. 34, T11N, R13E, UM At top of productive interval 3136' FNL, 1670' FEL, Sec. 27, TllN, R13E, UM At effective depth 3247' FNL, 5255' FEL, Sec. 26, T11 N, R13E, UM At total depth 3270' FNL, 5203' FEL, Sec. 26, T11 N, R13E, UM Development _X Explorato~_._ Stratigraphic__ Service__ (asp's 645397, 5949753) (asp's 648349, 5952469) (asp's 650046, 5952391) ~sp~ 650099, 5952369) RKB 87 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-15A 9. Permit number / approval number 201-089 10. APl number 50-029-20940-01 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool. 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2654' Intermediate 9955' Liner 434' 2327' Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) 12019 feet Plugs (measured) 8948 feet 11953 feet Junk (measured) 8916 feet Size Cemented Measured Depth True Vertical Depth 20" 72 cf Concrete 146' 146' 13-3/8" 3816 cf AS III 2690' 2690' 9-5/8" 230 cf 'G", 130 cf PF 'C' 9991' 8716' 7" 285 cf Class 'G' 9711'- 10145' 8490'- 8839' 3-1/2" x 2-7/8" 168 cf Class 'G' 9692' - 12019' 8474' - 8948' Open Perfs 10264-10518, 10550-10660, 10690-10780, 10900-10940, 10958-11134, Open Perfs 11150-11200, 11224-11296, 11320-11350, 11410-11450, 11480-11550, Open Perfs 11600-11906, Sqzd Perfs 10010' - 10031 ', 10128' - 10180'. Open Perfs 8904-8898, 8895-8888, 8886-8879, 8870-8866, 8864-8849, 8849-8848, Open Perfs 8846-8840, 8838-8836, 8834-8835, 8835-8838, 8841-8896 Sqzd Perfs 8731-8748, 8826-8865 4-1/2", 12.6#, L-80, TBG @ 9667' MD; 4-1/2", 12.6#, L-80, Tubing Tail @ 9747' MD. 13-3/8" x 9-5/8" DV PKR @ 2610'. 9-5/8" x 4-1/2" TIW HBBP PKR @ 9667'. 4-1/2" Otis SSSV @ 2074' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 04/01/2002 Subsequent to operation 04/22/2002 OiI-Bbl 387 Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl 1288 469 1154 3198 1692 Casing Pressure Tubing Pressure 331 345 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil _X Gas _ Suspended _ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. · ~~---¢~¢~z¢~ ~~~-~.~ Title: Technical Assistant DeWayne R, Schnorr Date April 26, 2002 Prepared by DeWar/ne R. $chnorr 564-5174 Form 10-404 Rev 06/15/88 · ORI61NAL SUBMIT IN DUPLICATE Y-15A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 03/27/2002 ANN-COMM (AC-EVAL AND REPAIR): AC-TIFL 04/06/2002 PERFORATING: LOAD WELL TO SECURE; PATCH TUBING / CASING 04/06/2002 PERFORATING: JEWELRY LOG--DEPTH CONTROL; PERFORATING 04/07/2002 PERFORATING: JEWELRY LOG--DEPTH CONTROL; PERFORATING EVENT SUMMARY 03/27/02 TIFL PASSED. EVALUATE HIGH IA PRESSURE DURING CTD. 04/06/02 MAKE UP SWS MEMORY GR/CCL. PT. LOAD IA W/CRUDE/METH CAP. FREEZE PROTECT FLOWLINE. KILL WELL W/10 BBL METH/WTR & 360 BBL OF FILTERED 2% KCL. FREEZE PROTECT BACKSIDE W/60 BBLS METH/WTR. TAG TD @ 11831' CTM. LOG GR/CCL FRO 11650'-10300'. PAINT FLAGS FOR PERFORATING @ 10700' & 11250' CTM. LAY IN 15 BBLS FLO-PRO FROM 11831'- 9600' CTM. FILL HOLE & PERFORM NO-FLOW TEST. M/U GUN # 1. RIH & PARK TOP SHOT @ 11150'. SHOOT INTERVALS FROM 11150-11200', 11320'-11350', 11410'-11450' & 11480'-11550'. POOH KEEPING HOLE FULL. TAG UP, FILL HOLE, PERFORM NO-FLOW TEST. LAY DOWN GUN # 1. MU GUN #2. RIH. 0~0~02 TIE INTO FLAG W/GUN 2. PARK @ 10550'. PUMP FLOPRO PILL, DROP BALL, SHOOT 10550'-10660', 10690'-10780', 10900'-10940'. POH, KEEPING HOLE FULL W/METH/WTR. TAG UP @ SURFACE. PERFORM NO-FLOW TEST. GOOD. LAY DOWN GUN 2. REFILL HOLE W/METH/WTR FOR FREEZE PROTECT. BLOW DOWN REEL W/N2 FOR MAINTENANCE. RDMO. Fluids Pumped BBLS 0 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( 0 TEST) 18 METHANOL 220 60/40 METHANOL WATER 360 2% KCL WATER 25 FLO-PRO 290 CRUDE 913 TOTAL Page I Y-15A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ADD PERFS 04/06-07/2002 THE FOLLOWING INTERVALS WERE PERFORATED USING THE 2" 2006 pj, 6SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 10550'-10660' 10690'-10780' 10900'-10940' 11150'-11200' 11320'-11350' 11410'-11450' 11480'-11550' Page 2 i' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service [] TSUSP 2. Name of Operator '7. Permit Number BP Exploration (Alaska) Inc. 201-089 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20940-01 4. Location of well at surface ..--~iT,~.,~-]!-i-~ ........ 9. Unit or Lease Name 514' SNL, 599' EWL, SEC. 34, T11N, R13E, UM I,,..--,: ': Prudhoe Bay Unit At top of productive interval ..~ <;=..,_~.[_ 2144' NSL, 3607' EWL, SEC. 27, T11N, R13E, UM At total depth .. "~.ii.'..':::.. 10. Well Number 2008' NSL, 77' EWL, SEC. 26, T11N, R13E, UM Y-15A 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool KBE = 86.80' ADL 028286 12. Date Spudded6/29/2001 113' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband'7/2/2001 7/8/2001 115' water depth' if °ffsh°reN/A MSL 116' N°' °f C°mpleti°nsOne 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 120. Depth where SSSV set1 21. Thickness of Permafrost 12019 8948 ETI 11953 8916 FTI []Yes [] NoI (Nipple) 2074' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, USMPR, RES, MEM CNL, CCL 23. CASING, LINER AND CEMENTING RECORD ,, CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" X 30" INSUL COND Surface 110' 36" 8 cu )/ds Concrete 13-3/8" 72# L-80 Surface 2690' 1'7-1/2,, 3816 cu ft AS III ' 9-5/8" 47# L-80 Surface 9991' 12-1/4" 230 cu ft Class 'G'r 130 cuft PF 'C' 7" 26# L-80 9711' 10145' 8-1/2" 285 cu ft Class 'G' 3-1/2. x2-7/8,,8.8# x 6.16# L-80 9692' 12019' 3-3/4" 168 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2" Gun Diameter, 6 SPF 4-1/2", 12.6#, L-80 9747' 9667' MD TVD MD TVD 10264' - 10518' 8904' - 8898' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. 10958' - 11134' 8864' - 8849' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11224' - 11296' 8846' - 8840' Freeze Protected with 30 Bbls of MeOH 11600' - 11906' 8841' - 8896' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) July 22, 2001 Gas Lift Date of Test Hours Tested PRoDuCTION FOR OIL'BBL ' GAS-MOF' WATER'BBL CHOKE SIZE I GAS-OIL RATIO 8/11/2001 4 TEST PERIOD 1460 2000 76.85 176I 1370 Flow Tubing Casing Pressure CALCULATED OIL'BBL GAS'MCF WATER'BBL OIL GRAVITY-APl (CORR) Press. 24-HouR RATE 25.8 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core R~ C E tV E D q 0'01 .Alaska 0il & Gas Cons. Commission Anchorage Form 10-407 Rev. 07-01-80 ORIGINAL Submit In Duplicate 29. Geologic Markers 30. Formation Tests Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered Depth Depth and gravity, GOR, and time of each phase. Top of Sadlerochit (original well) 10125' 8824' 45N 10167' 8857' 45P 10172' 8860' 44N 10214' 8886' 44P 10227' 8893' 44P 10525' 8898' 44N 10573' 8893' 45P 10936' 8867' 45N 10943' 8866' Top of Sadlerochit 11378' 8835' Top of Sadlerochit 11448' 8834' R E C E iV E D 45N 11714' 8853' 45P 11720' 8842' AUG g 2001 Alaska Oil & Gas Gons, Oommission Anchorage 81. List of Attachments: Summa~ o~ Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble,~~~"' -- ,~ Title TechnicalAssistant Date O~/~9/~1 Y- 15A 201-089 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 TREE = CAN 6" SA FETY NOTES: WELLFF_.A D COMPLETED W/~MERGENCY Y 15A ACTUATOR = OTIS m HGRVOIDABOVE70% OF COLLAPSEOF 9-5/8" OSG. WELL KB. ELEV = 86.77' EXCEEDS 70° @ 10230' AND GOES HORIZONTAL @ 10300'. BF. ELEV = 50.97' KOP = 3000' I 2074' II I 4-1/2" OTB SSSV LANDING NIP, ID 3.813" Max Angle = 100 @ 10979'~ IH I Datum MD = 10231' = 00' S ST IVD TVD DEV TYPE VLV LATCH PORT DATE 6 2816 2729 4 IVERLA DV RA 05/26/01 5 5640 5156 41 IVERLA DV RA 05/26/01 MinimumID = 2.37" @ 10178' . 4 7758 6738 36 ~ERLA DV RA 05/26/01 L 3 8984 7779 29 IVERLA DV RA 05/26/01 3-1/2" X 2-7/8" LIN ER XO 2 9447 8180 30 IVERLA DV RA 05/26/01 1 ' 9617 8324 33 IVERLA DV RA 05/26/01 I X ! I ' I I 19736' H4'1/2" OTIS XN NIP, ID: 3'725" I I I 9726' HELm'R'-LOGGED 11/27/92 9-5/8" CSG, 47#, L-80, ID = 8.681" 9991' II II ANGLE AT TOPPEI~: 78 @ 10264' ~oto: Refor to ~roduction DB for historical porf data 3-3/8" 6 10010-10031 S 6101 3-3/8" 6 10128-10130 S 2/93 3-3/8" 6 10130-10180 S 6/01 2" 6 10264-10518 0 07106/01 2" 6 10958-11134 O 07106101 2" 6 11224-112~ 0 07106101 2" 6 11600-11906 O 07/06/01 17"LNR, 26#,L80,.0383bpf, ID=6.276"I--i 10625' I I I I I 12-W8"LNR, 6.16#, L-80, S'[k, .0058bpf, ID= 2.37" H 12019' DA TE REV BY COIVIVIENTS DATE REV BY COMIVENTS PRUDHOE BAY UNIT 08/27/86 ORIGINAL COMPLETION 06/24/01 DBrvl/tlh SEF WHIPSTOCK/P&A WB.L: Y-15A 01/09/01 SIS-SLT CONVERTED TO CANVAS 07/07/01 CTD SIDE]'RACK PERMITNo: 201-089 03/14/01 SIS-rvD FINAL 07/21/01 CH/TP CORRECTIONS APINo: 50-029-20940-01 05/16/01 RN/TP CORRECTIONS 514' SNL& 599'EVVL, Sec. 34, T11N, R13E 06/21/01 /TP ADD IBP BP Exploration (Alaska) SIZE SFF INTERVAL Opn/Sqz DATE 3-3/8" 6 10010-10031 S 6/01 3-3/8" 6 10128-10130 S 2/93 3-3/8" 6 10130-10180 S 6/01 2" 6 10264-10518 O 07/06/01 2" 6 10958-11134 O 07/06/01 2" 6 11224-11296 O 07/06/01 2" 6 11600-11906 O 07/06/01 DATE REV BY COIVIVIENTS DATE REV BY COMIVENTS 08/27/86 ORIGINAL COMPLETION 06/24/01 DBIVVtlh SEt WHIPSTOCK/R&A 01/09/01 SIS-SLT CONVERTED TO CANVAS 07/07/01 CTD SIDE-I'RACK 03/14/01 SIS-rvD FINAL 07/21/01 CH/TP CORRECTIONS 05/1 6/01 RN/TP CORRECTIONS 06/21/01 /TP ADD IBP BP EXPLORATION Page 1 of 7 Operations Summa Report Legal Well Name: Y-15 Common Well Name: Y-15A Spud Date: 4/24/1983 Event Name: REENTER+COMPLETE Start: 6/24/2001 End: 7/8/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/8/2001 ,Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 6/24/2001 06:00 - 18:00 12.00 RIGU N WAIT PRE RD pumps, coil, scissor trailer. Scope down derrick. Work on floor motor clutch. PE's still working on removal of flowline, wellhouse and xmas tree from well. 12 hrs of rig standby time from 0600-1800 hrs on 6124101. 18:00 - 00:00 6.00 RIGU P PRE Lay herculite for complexes. Prep remaining complexes for move. 6/25/2001 00:00 - 06:00 6.00 RIGU P PRE PJSM on rig move. Moved boiler complex, pumps, both generators, coil trailer, scissor trailer, sub. 06:00 - 12:00 6.00 RIGU P PRE Spot CDR rig on Y-15 well. 12:00 - 23:30 11.50 RIGU P PRE RU CDR on Y15A. Raise derrick. Hook up mud lines. Raise coil tower and RU coil tower. Raise catwalk. Finished berms. Spot cuttings box. 23:30 - 00:00 0.50 RIGU P PRE NU BOPE's. 6/26/2001 00:00 - 03:00 3.00 RIGU P PRE Continue NU BOPE's. 03:00 - 04:30 1.50 RIGU P PRE RU to pull BPV. Waiting on TWC. Bleed off 1700 psi on IA. 04:30 - 06:00 1.50 RIGU P PRE RU to bleed down 525 psi on wellhead. Bleed off methanol. 06:00 - 13:30 7.50 RIGU P PRE P/Tested BOPE as per AOGCC regulations. Witnessing of test waived by State Rep Leu Grimaldi. While testing BOPE, the gauge came off top of test jt under pressure causing the test jt to jump & an ear on the dog collar to break. 13:30 - 16:00 2.50 RIGU P PRE R/U & test DSM lubricator. Pull 2WCV. RID lubricator. 16:00 - 17:00 1.00 RIGU P PRE M/U MHA & nozzle, BHA#1. M/U coil. Flood lines & stack. P/Test outside lines - OK. 17:00 - 18:00 1.00 RIGU P PRE RIH BHA#1 to 2200' displacing out MeOH FP fluid with KCL. 18:00 - 19:00 1.00 RIGU P PRE POOH BHA#1. 19:00 - 19:30 0.50 RIGU P PRE OOH. Rack back injector. LID BHA#1. 19:30 - 20:30 1.00 STWHIP P WEXlT M/U window milling BHA #2 (OAL -- 85.16'). M/U injector to BHA. 20:30 - 23:30 3.00 STWHIP P WEXIT RIH with BHA#2 & tie into EOP flag @ 9627' (+42' correction to 9585'). Continue RIH circ at min rate to XN nipple at 9727' (uncorr). Correct depth to ELM of 9736' (+9'). 23:30 - 00:00 0.50 STWHIP P WEXIT Had repetitive stalls @ XN. P/U & slowly ease into milling - had continuous stalls. Finally milled thru XN nipple. Made several passes with & without pumping. 6/27/2001 00:00 - 01:00 1.00 STWHIP P WEXIT Wipe/drift thru XN nipple - OK. RIH & tag up @ 10161' (uncorr). PUH to flag & reconfirm depth tracking - OK. RBIH & finally tag up @ 10167.1'. Correct to 10145' WS pinch pt. 01:00 - 13:30 12.50 S'I-WHIP P WEXIT Paint flag & resume window milling. Mill 3.8" window from 10145' to 10153'. Drilled formation to 11163'. Dress/drift window & made several backream passes till clean. Meanwhile swap well to flopro mud. 13:30 - 17:30 4.00 STWHIP P WEXIT POOH BHA#2. Flag EOP @ 10,000'. Monitor well @ 500'. While POOH, observed coil kinked @ +/-9435'. 17:30 - 18:00 0.50 STWHIP P WEXIT OOH. L/D window milling BHA#2. 18:00 - 20:30 2.50 STWHIP N RREP WEXIT RIH with nozzle above MV. Close MV & stripper. Displace coil to KCL. 20:30 - 22:00 1.50 STWHIP N RREP WEXIT PJSM. Hook up Dowell hard-line to 1502 on #1 pump line. Isolate shaker valve. Blow down coil with nitrogen taking returns through manual choke & out to tiger tank. 22:00 - 23:00 1.00 STWHIP N RREP WEXIT Cross chain reel. Install clamp on coil 4' above injector & cross chain clamp to reel. Cut off coil 1' below clamp. Lay over coil. 23:00 - 00:00 1.00 STWHIP N RREP WEXIT New coil trailer arrive location. Meanwhile wait on crane. 6/28/2001 00:00 - 08:00 8.00 STWHIP N RREP WEXIT Crane arrive location @ 02:00 Hrs. Swap out coil reels. Raise Printed: 7/9/2001 3:50:45 PM BP EXPLORATION Page 2 of 7 Operations Summa Report Legal Well Name: Y-15 Common Well Name: Y-15A Spud Date: 4/24/1983 Event Name: REENTER+COMPLETE Start: 6/24/2001 End: 7/8/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/8/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 6/28/2001 00:00 - 08:00 8.00 STWHIP N RREP WEXlT coil trailer. Install back brake & swivel. 08:00 - 11:00 3.00 STWHIP N RREP WEXlT Install new weld on connector. Pull/pressure test WOC - OK. 11:00 - 17:00 6.00 STVVHIP N RREP WEXlT 'Drop dart. Pump 99bbl, no dart retrieved. Pump 2nd dart & displace. 1st dart bumped after 25bbls. Retrieve 1st dart. Pumped 60bbls more & retrieve 2nd dart. Total coil displacement estimated @ 60.7bbls. To reconfirm before cement job. 17:00 - 18:00 1.00 DRILL P PROD1 M/U build/turn drilling BHA#3. 18:00 - 21:30 3.50 DRILL P PROD1 RIH BHA#3 to 350'. SliT orienter & MWD - OK. Continue RIH to 9900'. 21:30 - 00:00 2.50 DRILL P PROD1 Tie into GR marker. 6/29/2001 00:00 - 00:30 0.50 DRILL P PROD1 Continue tieing into GR marker (-37' correction). 00:30 - 01:00 0.50. DRILL P PROD1 Orient. RIH & tag up @ 10163'. 01:00- 01:20 0.33 DRILL iN SFAL PROD1 Reboot MWD surface computers. 01:20 - 01:45 0.42 DRILL P PROD1 Orient to 0-10L & drill to 10168' with 2.4bpm / 3000psi freespin / 250psi dp / 2k WOB / 20fph ROP. 01:45 - 02:00 0.25 DRILL P PROD1 Orient to 0-10R & drill to 10184' with 2.4bpm / 3000psi freespin / 300psi dp / 3k WOB / 64fph ROP. 02:00 - 02:20 0.33 DRILL P PROD1 Orient to 25-35R & drill to 10199' with 2.4bpm / 2950psi freespin / 325psi dp / 3k WOB / 45fph ROP. 02:20 - 03:00 0.67 DRILL P PROD1 Pressure increase by 250psi. Check/clean screens and pressure - OK. 03:00 - 03:25 0.42 DRILL P PROD1 Orient 8 clicks twice as orienter did not respond 1st time. 03:25 - 04:10 0.75 DRILL P PROD1 Drill to 10228' with 2.5bpm / 2975psi freespin / 210psi dp / 20R TF / lk WOB / 39fph ROP. Had several motor stalls with less than 100psi dp. 04:10 - 05:00 0.83 DRILL P PROD1 Drill to 10266' with 2.5bpm / 2980psi freespin / 220psi dp / 0-10R TF / 2k WOB / 45fph ROP. 05:00 - 05:20 0.33 DRILL P PROD1 Wiper trip from 10266' to 10163'. 05:20 - 05:50 0.50 DRILL P PROD1 Drill to & landed buid section @ 10296' with 2.5bpm / 3000psi freespin / 50psi dp / 0 TF / 2k WOB / 60fph ROP. Landed 17'sstvd (Geology requested 10-15') higher than plan trajectory with an average DLS of 38deg/100'. 05:50 - 06:30 0.67 DRILL P PROD1 Wiper trip from 10296' to EOP @ 9900'. 06:30 - 07:00 0.50 DRILL P PROD1 Take flow off surveys. 07:00 - 10:00 3.00 DRILL P PROD1 POOH BH^#3 for lateral motor. Paint EOP flag @ 9900'. Continue POOH & monitor well @ 500' - OK. 10:00 - 10:30 0.50 DRILL P PROD1 OOH. L/D BHA#3. 10:30 - 11:30 1,00 DRILL N RREP PROD1 Drop, pump & retrieve dart. Total coil displacement confirmed to be 58.7bbls. 11:30 - 13:00 1.50 DRILL P PROD1 PJSM. M/U lateral drilling BHA#4 with BHI USMPR tool. 13:00 - 15:45 2.75 DRILL P PROD1 RIH BHAng, to 500'. SHT orienter & MWD - OK. Continue RIH to EOP @ 9900' (-43' correction). 15:45 - 17:00 1.25 DRILL P PROD1 Tied into GR marker (+4' correction). 17:00 - 19:00 2.00 DRILL P PROD1 RIH to btm. Logged-up resistivity across build section from 10296' to 10160'. RBIH to btm. 19:00 - 21:20 2.33 DRILL P PROD1 Drill to 10444' with 2.5bpm / 2900psi freespin / 200-300psi dp / 65-80R TF / 2k WOB / 66fph ave ROP. See indications of formation change & fault crossing @ 10342' with no losses. 21:20 - 21:40 0.33 DRILL P PROD1 Wiper trip to window. Up wt =35k; Down wt =25k. No overpulls. 21:40 - 21:45 0.08 DRILL P PROD1 Drill to 10452' with 2.5bpm / 2900psi freespin / 200psi dp / 80-90R TF / 2k WOB / 96fph ROP. 21:45 - 22:10 0.42 DRILL P PROD1 TF flopped to 90-100R. Reorient to 60-70R. Printed: 7/9/2001 3:50:,45 PM BP EXPLORATION Page 3 of 7 Operations Summa Report Legal Well Name: Y-15 Common Well Name: Y-15A Spud Date: 4/24/1983 Event Name: REENTER+COMPLETE Start: 6/24/2001 End: 7/8/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/8/2001 Rig Name: CDR-1 Rig Number: 1 Date From To Hours Activity Code NPT Phase Description of Operations 6/29/2001 22:10 - 00:00 1.83 DRILL P PROD1 Drill to 10543' with 2.5bpm / 2900psi freespin / 200psi dp / 60-80R TF / 2k WOB / 70fph ave ROP. 6/30/2001 00:00 - 01:40 1.67 DRILL P PROD1 Drill to 10656' with 2.Sbpm / 2900psi freespin / 350psi dp / 80-120L TF / 2k WOB / 64fph ave ROP. Suspect fault crossing @ 10600'. 01:40 - 02:00 0.33 DRILL P PROD1 Wiper trip to window. 02:00 - 03:30 1.50 DRILL P PROD1 Orient to 60-80R & drill to 10703' with 2.5bpm / 2900psi freespin / 350psi dp / 2k WOB / 35fph ROP. Getting 180 deg reactive. Orient as needed to compensate. Suspect fault crossing @ 10663'. 03:30 - 04:20 0.83 DRILL P PROD1 Drill to 10748' with 2.5bpm / 2900psi freespin / 400psi dp / 90-120R TF / 2k WOB / 41fph ave ROP. Building @ 80-90R & stacking. 04:20 - 05:00 0.67 DRILL P PROD1 Wiper trip to window. 05:00 - 06:15 1.25 DRILL P PROD1 Drill to 10806' with 2.5bpm / 2900psi freespin / 400psi dp / 90-140R TF / 2k WOB / 53fph ave ROP. Flow off survey. 16bbl total losses in 12 hrs. 06:15 - 07:15 1.00 DRILL P PROD1 Orient to 60-100R & drill to 10890' with 2.5bpm / 3000psi freespin / 300psi dp / 6k WOB / 101fph ROP. TF walks right. 07:15 - 08:45 1.50 DRILL P PROD1 Orient. Drill & stalling. Reorient to 30-70R & drill to 10943' with 2.5bpm / 3000psi freespin / 300psi dp / 6k WOB / 108fph ave ROP. 08:45 - 09:40 0.92 DRILL P PROD1 Wiper trip to window. 09:40 - 11:20 1.67 DRILL P PROD1 Drill to 11038' with 2.Sbpm / 3000psi freespin / 300-400psi dp / 60-120R TF / 8k ave WOB / 73fph ave ROP. Flow off survey. 11:20-12:15 0.92 DRILL P PROD1 Drillto11084'with2.5bpm13150psifreespin1250psidpl 120-140L TF / 9k ave WOB / 87fph ave ROP. Stacking. 12:15 - 12:30 0.25 DRILL P PROD1 Short 100' wiper trip. Start new mud downhole. 12:30 - 13:50 1.33 DRILL P PROD1 Drill to 11200' with 2.5bpm / 3100-3300psi freespin / 300-500psi dp / 120-45L TF / 6k ave WOB / 97fph ave ROP. Walking right. 13:50 - 15:00 1.17 DRILL P PROD1 Wiper trip to window. 15:00 - 15:50 0.83 DRILL P PROD1 Drill to 11288' with 2.5bpm / 3100psi freespin / 400psi dp / 100-60L TF / 5k ave WOB / 107fph ave ROP. 15:50 - 16:05 0.25 DRILL P PROD1 Short 100' wiper trip. 16:05 - 17:20 1.25 DRILL P PROD1 Drill to 11400' with 2.5bpm / 3100psi freespin / 300psi dp / 120-95L TF / 6k ave WOB / 101fph ave ROP. 17:20 - 18:30 1.17 DRILL P PROD1 Wiper trip to window. 18:30 - 20:15 1.75 DRILL P PROD1 Drill to 11489' with 2.Sbpm / 3100-3300psi freespin / 300psi dp / 65-95R TF / 3k WOB / 97fph ave ROP. Unable to orient to 80R. 20:15 - 20:45 0.50 DRILL P PROD1 Short 100' wiper trip. 20:45 - 23:30 2.75 DRILL P PROD1 Drill to 11678' with 2.5bpm / 3300psi freespin / 200-600psi dp / 80-120R TF / 3k WOB / 76fph ave ROP. 23:30 - 00:00 0.50 DRILL P PROD1 Wiper trip to window. 7/1/2001 00:00 - 01:30 1.50 DRILL P PROD1 Tie into GR marker @ 10230' (-20' correction). 01:30 - 02:00 0.50 DRILL P PROD1 RBIH to bottom. 02:00 - 03:00 1.00 DRILL P PROD1 Drill to 11680' with 2.5bpm / 3750psi freespin / 450psi dp / 150R TF / 2k WOB / 37fph ave ROP. No reactive. Slow drilling. Motor acting-up. Swap pumps for MWD. 03:00 - 05:20 2.33 DRILL P PROD1 Drill to 11724' with 2.5bpm / 3750psi freespin / 450psi dp / 95-100R TF / 2k WOB / 16fph ave ROP. No progress - suspect motor or bit. Motor is up at max recommended hours. Printed: 7/9/2001 3:50:45 PM BP EXPLORATION Page 4 of 7 Operations Summa Report Legal Well Name: Y-15 Common Well Name: Y-15A Spud Date: 4/24/1983 Event Name: REENTER+COMPLETE Start: 6/24/2001 End: 7/8/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/8/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/1/2001 05:20 - 09:00 3.67 DRILL P PROD1 POOH BHA#4 to changeout motor. Paint EOP flag @ 9900'. Continue POOH & monitor well @ 500' - OK. 09:00 - 09:30 0.50 DRILL P PROD1 OOH. I_/D BHA#4. Observe weak motor - could turn easily with wrenches. 09:30 - 10:00 0.50. DRILL P PROD1 Download MPR data. 10:00 - 10:30 0.50 DRILL P PROD1 M/U lateral drilling BHA#5 with new motor & MH^. 10:30 - 13:30 3.00 DRILL P PROD1 RIH BHA#5 to 500'. SHT orienter & MWD - OK. Continue RIH to EOP @ 9900' (-31' correction). 13:30 - 14:00 0.50 DRILL P PROD1 Tie into GR marker (-1' correction). 14:00 - 14:50 0.83 DRILL P PROD1 RIH to btm and tag up @ 11722'. 14:50 - 16:40 1.83 DRILL P PROD1 Drill to 11810' with 2.5bpm / 3200psi freespin / 300psi dp / 95-120R TF / 6k ave WOB / 83fph ave ROP. 16:40 - 17:20 0.67 DRILL 3 PROD1 Drill to 11831' with 2.5bpm / 3200psi freespin / 300psi dp / 140L TF / 14k WOB / 63fph ROP. 17:20 - 17:35 0.25 DRILL ~ PROD1 Short 100' wiper trip. 17:35 - 17:40 0.08 DRILL 3 PROD1 Drill to 11835' with 2.5bpm / 3300psi freespin / 300psi dp / 120L TF / 15k WOB / 48fph ROP. 17:40 - 19:10 1.50 DRILL 3 PROD1 Wiper trip to window. 19:10 - 19:30 0.33 DRILL ~ PROD1 Will not drill. Start 50 bbls new mud down hole. 19:30 - 20:10 0.67 DRILL P PROD1 Drill to 11864' with 2.5bpm / 3300psi freespin / 200-550psi dp / 100-120L TF / 9k ave WOB / 42fph ave ROP. 60-70fph with new mud, but stacking with old mud. 20:10 - 23:50 3.67 DRILL 3 PROD1 Drill to 11986' with 2.5bpm / 3550psi freespin / 400psi dp / 95-100L TF / 11 k ave WOB / 43fph ave ROP. Continuous stalls. 23:50 - 00:00 0.17 DRILL 3 PROD1 300' wiper trip. 7/2/2001 00:00 - 00:45 0.75 DRILL 3 PROD1 Drill & TD lateral section @ 12022' with 2.5bpm / 3650psi freespin / 250psi dp / 100L TF / 14k ave WOB / 29fph ave ROP. 00:45 - 02:20 1.58 DRILL 3 PROD1 Work tight spots while PUH to tie in. 02:20 - 03:00 0.67 DRILL 3 PROD1 Tie into GR marker @ 10230' (-4' correction). 03:00 - 04:00 1.00 DRILL ~ PROD1 Drift hole to bottom & tag TD @ 12019'. 104:00 - 07:00 3.00 DRILL 3 PROD1 POOH BHA#~ for openhole MCNL/GR log. Paint EOP flag @ 9900'. Continue POOH & monitor well @ 500' - OK. 07:00 - 08:00 1.00 DRILL P PROD1 OOH. L/D BHA#5. 08:00 - 09:00 1.00 DRILL P PROD1 Download MPR data. 09:00 - 10:30 1.50 DRILL P PROD1 M/U MHA, stinger & nozzle, BHA#6. RIH & service injector. POOH & L/D BHA#6. 10:30 - 11:30 1.00 EV^L P COMP PJSM & HNHM on logging job. R/U MCNL/GR logging tools. Advised to postpone logging job. R/D logging tools. 11:30 - 14:30 3.00 CASE P COMP M/U MHA, stinger & nozzle, BHA#7. RIH to EOP (+2' correction). 14:30 - 18:00 3.50 CASE P COMP POOH BHA#7. Paint EOP flags @ 9500', 9000' & 7800'. Continue POOH & L/D nozzle. 18:00 - 19:30 1.50 CASE P COMP Cut off WOC and install Baker slip type connector. Pull test same to 15000 lbs and pressure test to 3500 psi - OK. R/U for running 2-7/8" & 3-1/2" liner. 19:30 - 20:00 0.50 CASE P COMP PJSM, HNHM and pre-job review on running liner. Review procedures and emphasize on different liner sizes and safe handling of running tools. 20:00 - 00:00 4.00 CASE P COMP M/U & RIH 2-7/8", 6.16#, L-80 STL liner X/over to 3-1/2", 9.2#, L-80 FL4S liner and jewelry as per program. 7/3/2001 00:00 - 02:00 2.00 CASE P COMP Continue RIH 2-7~8" x 3-1/2" liner. MU CTLRT with Printed: 7/9/2001 3:50:45 PM BP EXPLORATION Page 5 of 7 Operations Summa Report Legal Well Name: Y-15 Common Well Name: Y-15A Spud Date: 4/24/1983 Event Name: REENTER+COMPLETE Start: 6/24/2001 End: 7/8/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/8/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/3/2001 00:00 - 02:00 2.00 CASE P COMP disconnect/swivel & latch into deployment sleeve. M/U coil. 02:00 - 04:30 2.50 CASE P COMP RIH liner assy BHA#8 @ 100 fpm pumping @ 0.30bpm/1700psi. Tie into EOP flag (-39' correction). RIH thru window @ 50 fpm - no bobbles. Continue RIH & tag TD @ 12017'. Up wt = 36k & down wt = 17k. 04:30 - 06:00 1.50 CASE P COMP PJSM. Drop 5~8" ball and pump down @ 2.5bpm. Ball on seat @ 40bbls. Pressure up to 2850psi & shear out ball. P/U @ 29k confiming release & wt loss of 7k. TOL @ 9692'. PBTD @ 11950'. Will correct w/memory log. 06:00 - 10:30 4.50 CEMT P COMP Pump 15bbls biozan pill ahead and displace well to 2% KCl at 2.6bpm & 3200psi max. Meanwhile W.O. Dowell and additional KCL. 10:30 - 11:00 0.50 CEMT P COMP PJSM & HA/HM on cementing job. Emphasis on personnel communication, staying clear of HP lines & monitoring fluids. 11:00 - 11:30 0.50 CEMT P COMP RU Dowell. Dowell batch mix cement slurry to desired properties (15.8ppg). 11:30 - 11:50 0.33 CEMT P COMP Pump 5 bbls of KCL/water preflush. Test lines to 4000 psi - OK. Pump additional 5 bbls of KCL/water ahead. 11:50 - 12:00 0.17 CEMT P COMP Pump 30 bbls of cement slurry @ 1.9bpm/1700psi. 12:00 - 12:45 0.75 CEMT P COMP Load & launch dart. Pump lbbl KCL. Shut down & confirm that dart left the launching chamber. Continue displacing dart at 2.8bpm/1600psi. Slow to 2bpm & latched up to wiper plug @ total of 61.2bbls. Pressure up & shear wiper plug @ 3000psi. Continue displacing & bumped plug w/75.5bbls total displacement @ 2000psi. Bleed off pressure & checked floats - OK. ClP @ 12:40. 1:1 returns throughout job. 12:45 - 14:30 1.75 CEMT P COMP Pump 10bbls biozan pill. Pressure to 1000 psi & sting out of PBR. Confirm sting-out. 14:30 - 16:30 2.00 CEMT P COMP Circulate biozan pill out & circulate at liner top. Paint EOP flag & POOH. Flush GLMs while POOH. L/D CTLRT. 16:30 - 18:00 1.50 CLEAN P COMP M/U swizzle stick to coil & flush out stack. 18:00 - 19:00 1.00 CLEAN P COMP R/B injector. LID Swizzle stick. Re-tighten Baker coil connector. 19:00 - 22:30 3.50 CLEAN P COMP PJSM. M/U cement ¢leanout BHA#9 w/2.30" mill & 2-1/8" motor. P/U 1-1/4" CS Hydril tubing. 22:30 - 23:00 0.50 CLEAN N MISC COMP Observe damaged I~ox thread on 5PA Box x 2-3/8" Reg pin X/over to Baker coil connector. Receive new X/over from Baker. 23:00 - 00:00 1.00 CLEAN P COMP M/U coil to BHA & RIH to 5300'. Compressive strength of cement = 1500psi @ 20:45 hrs. 7/4/2001 00:00 - 02:00 2.00 CLEAN P COMP RIH w/cleanout BHA, correct @ EOP flag, subtract 30'. 02:00 - 02:30 0.50 CLEAN P COMP Tag cement @ 11,681' & drill @ 200-250 fph to 11,712'. 02:30 - 03:00 0.50 CLEAN N STUC COMP Stuck @ 11,712', work pipe & pump biozan sweep, pull free. 03:00 - 09:00 6.00 CLEAN P COMP Drill cement @ 50 fph to 11,944'. Tag latch collar @ 11,944', (depth uncorrected to log). 09:00 - 09:45 0.75 CLEAN P COMP Pump biozan sweep & chase w/clean KCL. 09:45 - 12:30 2.75 CLEAN P COMP POOH w/displacing to clean KCL. 12:30 - 15:15 2.75 CLEAN P COMP Rack back 74jts 1-1/4" CS Hydril & L/D BHA. 15:15 - 16:30 1.25 CLEAN P COMP Line up to test liner lap. Compressive strength of cement @ 0600 was 2527 psi. I/A 0 psi, & O/A 150 psi @ onset of test. Staged up in 500 psi intervals, monitoring I/A & O/A. PT @ 2000 psi, leaked 600 psi in 15 rain, no change in inner or outer annulus pressures throughout test. i 16:30 - 17:00 0.50 EVAL P COMP PJSM, HNHM and pre-job review on logging job. Review Printed: 7/912001 3:50:45 PM BP EXPLORATION Page 6 of 7 Operations Summa Report Legal Well Name: Y-15 Common Well Name: Y-15A Spud Date: 4/24/1983 Event Name: REENTER+COMPLETE Start: 6/24/2001 End: 7/8/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/8/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/4/2001 16:30 - 17:00 0.50 EVAL P COMP ~rocedures and emphasize handling radio active source. 17:00 - 20:15 3.25 EVAL P COMP P/U SWS CNLJGPJCCL tool & M/U to 1-1/4" CS Hydril tubing. 20:15 - 22:15 2.00 EVAL P COMP M/U coil to BHA, RIH & synchronize depth tracking with SWS. Continue RIH to 9573' & tie into EOP flag (-45' correction). 22:15 - 00:00 1.75 EVAL ~ COMP Log down @ 30fpm from 9600' to PBTD (tagged @ 11941') & log back up from PBTD to 11480'. 7/5/2001 00:00 - 01:15 1.25 EVAL 3 COMP Continue logging f/11,941' up to 9600'. RBIH to 11,941'. 01:15 - 04:45 3.50 EVAL 3 COMP Lay in New 150,000 LSRV FIo Pro & POOH. Test choke manifold w/POOH. 04:45 - 08:00 3.25 EVAL ~ COMP Rack back 74 jts 1 1/4" CS Hydril, L/D logging tool. 08:00 - 08:15 0.25 EVAL 3 COMP Safety meeting on handling of memory logging tool. 08:15 - 08:45 0.50 EVAL ~ COMP L/D logging tool & download same. Confirm TOL @ 9687' & PBTD @ 11951'. 08:45 - 09:30 0.75 BOPSUF 3 COMP Set test plug prior to testing BOPE. 09:30 - 18:00 8.50 BOPSUF N DFAL COMP Attempt to test choke manifold, (one set of valves w/State Inspector witnessing), unable to get test. After several attempts, and pressure not holding, realign valves to isolate 3otential leaks & repressure to 3950 psi at which time a noise like a door slamming was heard to come from the wellhead. Wellhead personell were called out & attempts to retrieve Cameron 6"J plug were unsuccessful. Determined that plug was centered properly, but approximately 6" higher than it should be when properly set. Discussed w/town & opt to attempt to pull w/rig & up jars, rig up to do same. 18:00 - 20:00 2.00 BOPSUF.N DFAL COMP Mobilise fishing tools from BOT. Meanwhile check derrick, drawworks and BOPs. 20:00 - 20:30 0.50 BOPSUF.N DFAL COMP PJSM on fishing operation with all personnel. Review procedures & advice all non essential personnel to stay off the rig floor while jarring. 20:30 - 21:30 1.00 BOPSUF,N DFAL COMP R/U fishing tool - O/S box, 3-1/2" DP P/its & jar. RIH with blocks & screw onto TVVCV with 4 RH turns. P/U in stages to 40klbs over block wt & pull TVVCV free. Retract dogs w/7 RH turns & pull TVVCV OOH. L/D fishing tool. Observe damaged upper seals on TWCV. 21:30 - 23:00 1.50 BOPSUF:N DFAL COMP R/U DSM lubricator & set another TVVCV. R/D lubricator. 23:00- 23:30 0.50 BOPSUF:N DFAL COMP PJSM on BOP testing. 23:30 - 00:00 0.50 BOPSUF:N DFAL COMP Attempt to body test BOP stack, pressure leaking. Troubleshoot surface equipment & lines, no leakages. Suspect TWC¥. 7/6/2001 00:00 - 02:45 2.75 BOPSUF:N DFAL COMP P,/U to pull Cameron 6"J plug, pull same & inspect, no apparent flaws. Set 3rd plug. 02:45 - 09:00 6.25 BOPSUF:P COMP Full test on BOPE, manual kill line failed, repaired same. 09:00 - 09:45 0.75 BOPSUF:P COMP Pull 2 way check. 09:45 - 12:00 2.25 BOPSUF:P COMP Rig up to & test I/A & 4 1/2" tubing/2 7/8" liner lap @ 2000 psi f/ 30 minutes. Bled 75 psi in 30 minutes. 12:00 - 12:30 0.50 PERF . P COMP PJSM & HNHM on perforation job. Emphasize on safe gun handling procedures & good communication. 12:30 - 14:00 1.50 PERF P COMP P/U & RIH 2" HSD 4spf perforating guns. 14:00 - 15:30 1.50 PERF ;P COMP P/U & RIH 55 its 1-1/4" CSH workstring. 15:30 - 18:30 3.00 PERF P COMP MU injector. RIH with perf guns. Tag bottom. PUH & position bottom shot @ 11906' for 1st shot. 18:30 - 19:00 0.50 PERF P COMP PJSM with crew, SWS prior to firing perf guns. 19:00 - 19:30 0.50 PERF P COMP Pressure up annulus to 400psi & ramp up to 1700psi. Hold for Printed: 7/9/2001 3:50:45 PM BP EXPLORATION Page 7 of 7 Operations Summa Report Legal Well Name: Y-15 'Common Well Name: Y-15A Spud Date: 4/24/1983 Event Name: REENTER+COMPLETE Start: 6/24/2001 End: 7/8/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/8/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/6/2001 19:00 - 19:30 0.50, PERF P COMP 2rains. Bleed off pressure & wait approx 15mins for lower set of guns to fire. Perf intervals: 11600'-11906'. Bring up annular pressure to 1700psi & observe 885psi bleed off in 3mins confirming fired shots. Also observe shot detection on sonolog. 19:30 - 20:00 0.50 PERF P COMP PUH to position upper set of guns for second set of perfs. 20:00 - 20:45 0.75 PERF P COMP Load 5/8" ball &circ down while positioning guns for bottom shot at 11296'. Pump ball on seat slowing to 1 bpm. Ball on seat @ 54.5 bbls away. Observe 4000psi circulating pressure while circulating ball @ 2.5bpm?? 20:45 - 21:00 0.25 PERF P COMP Pressure up to 4000psi & observe firing head fire upper guns. Perf Intervals: 10958'-11134' and 11224'-11296'. 21:00 - 22:45 1.75 PERF P COMP POOH to 9650' with guns filling hole via the annulus - OK. Paint EOP flag & monitor well - OK. Continue POOH & monitor well @ 2950'- OK. Continue POOH. 22:45 - 00:00 1.25 PERF P COMP PJSM. Rack back injector. Rack back 1-1/4" CS Hydril tubing work string. Monitor well @ 500' for 10rains - static. 7/7/2001 00:00 - 02:30 2.50 PERF P COMP Rack back 55 jts of 1-1/4" CS Hydril 02:30 - 02:45 0.25 PERF P COMP PJSM on handling perf guns, laying down & picking up same. Emphasis on good communication & line of sight for winch operator. 02:45 - 04:45 2.00 PERF P COMP L/D perf guns, ASF. Fill & monitor well, well stable. 04:45 - 05:30 0.75 PERF P COMP P/U 13 perf guns. 05:30 - 07:15 1.75 PERF P COMP RIH w/25 jts of 1-1/4" CS Hydril. 07:15 - 10:00 2.75 PERF P COMP RIH w/perf guns, subtract 39' @ EOP flag. 10:00 - 11:15 1.25 PERF P COMP Launch 5/8" ball & park @ 10,518'. Circulate ball down @ 2.5 bpm & slow pump to 1.5 bpm @ 45 bbls away. See pressure spike & zero return rate w/54 bbls away indicating ball on seat, : appears guns fired @ 2450 psi. Circulate to verify. 11:15 - 11:45 0.50 PERF P COMP . POOH to 9600' & monitor well, no fluid losses to hole, well stable. 11:45 - 14:30 2.75 PERF P COMP POOH, monitor well @ 500', well stable, no fluid losses to hole. 14:30 - 15:30 1.00 PERF P COMP Rack back 25 jts of 1-1/4" CS Hydril. 15:30 - 15:45 0.25 PERF P COMP PJSM on laying down perf guns, emphasis on communication & review of well control procedure. : 15:45 - 16:15 0.50 PERF P COMP LID 13 guns, ASF. 16:15 - 18:00 1.75 PERF P COMP Hole full, well stable, close master valve & LID 1-1/4" CS Hydril tubing. 18:00 - 21:30 3.50 RIGD P COMP M/U stinger & nozzle. RIH to 2000' & FP well to methanol/water, POOH. RIB injector & LID nozzle. 21:30 - 23:00 1.50 RIGD P COMP R/U DSM lubricator. Set BPV. RID lubricator. 23:00 - 00:00 1.00 RIGD P COMP RIH with nozzle above MV. Close MV & stripper. Line up to blow down coil with nitrogen. Meanwhile RID & blow down mud pump #2 & begin cleaning pits. 7/8/2001 00:00 - 02:00 2.00 RIGD P COMP Wait on N2 truck & blow down mudpumps, clean pits. 02:00 - 02:15 0.25 RIGD P COMP Pre job on evacuating coil w/N2. Focus on proper valve alignment, good communication & attention on choke manifold. 02:15 - 04:30 2.25 RIGD P COMP Blow down coil w/N2 & allow pressure to bleed to zero. 04:30 - 05:00 0.50 RIGD P COMP L/D nozzle. 05:00 - 08:00 3.00 RIGD P COMP Nipple down BOPE, nipple up tree cap, secure well. Rig released @ 0800 hrs, 07/08/01. Printed: 7/9/2001 3:50:45 PM ObP BP Amoco Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad Well: Y-15 Wellpath: Y-15A Date: 816/2001 Time: 10:06:29 Page: 1 Co-ordinate(NE) Reference: Well: Y-15, True North Vertical (TVD) Reference: 22: 15 4/2411983 00:00 86.8 Section (VS) Reference: Well (0.00N,0.00E,90.00Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Alaska, Zone 4 Coordinate System: Well Centre Geomagnetic Model: BGGM2001 Site: PB Y Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5948541.48 ft Latitude: 70 16 0.041 N 647748.73 ft Longitude: 148 48 18.991 W North Reference: True Grid Convergence: 1.12 deg Well: Y-15 Slot Name: 15 Y-15 Well Position: +N/-S 1257.56 ft Northing: 5949753.00 ft Latitude: 70 16 12.406 N +E/-W-2328.67 ft Easting: 645396.00 ft Longitude: 148 49 26.781 W Position Uncertainty: 0.00 ft Wellpath: Y-15A Drilled From: Y-15 500292094001 Tie-on Depth: 10140.00 ft Current Datum: 22: 15 4/24/1983 00:00 Height 86.80 ft Above System Datum: Mean Sea Level Magnetic Data: 6/1/2001 Declination: 26.57 deg Field Strength: 57471 nT Mag Dip Angle: 80.75 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ff ft ff deg 0.00 0.00 0.00 90.00 Survey: MWD Start Date: 7/2/2001 Company: Baker Hughes INTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Annotation I 10'140.00 KOp ': : :: i!::: i::' i 112019.00 8948.02 TD Survey MD"''. Incl Azim. TVD 'SSTVD : ': N/S.' E/W MapN. MaPE' ?' "DLS... ".VS'. ft · ..' deg dOg ff ':'. ff "· "..' ft'" . ft ' 'fi:.. :. ft..." .' ' deg/100ft 'ff 10140.00 36.55 66.07 8835.83 8749.03 2662.87 3011.18 5952473.34 648354.95 0.00 3011.18 10192.00 50.10 75.40 8873.61 8786.81 2674.24 3044.83 5952485.36 648388.37 28.76 3044.83 10226.00 64.00 70.20 8892.07 8805.27 2682.75 3071.97 5952494.39 648415.34 42.83 3071.97 10262.00 78.10 69.80 8903.73 8816.93 2694.37 3103.88 5952506.62 648447.02 39.18 3103.88 10295.00 88.90 66.30 8907.46 8820.66 2706.62 3134.24 5952519.45 648477.14 34.38 3134.24 10325.00 90.50 70.20 8907.62 8820.82 2717.73 3162.10 5952531.10 648504.77 14.05 3162.10 10362.00 91.70 74.00 8906.91 8820.11 2729.10 3197.29 5952543.15 648539.74 10.77 3197.29 10392.00 92.40 77.50 8905.83 8819.03 2736.48 3226.35 5952551.08 648568.64 11.89 3226.35 10432.00 92.50 83.20 8904.12 8817.32 2743.17 3265.73 5952558.54 648607.88 14.24 3265.73 10464.00 93.10 86.30 8902.56 8815.76 2746.10 3297.55 5952562.08 648639.64 9.86 3297.55 10504.00 95.30 89.50 8899.63 8812.83 2747.56 3337.41 5952564.31 648679.46 9.69 3337.41 10535.00 96.50 86.00 8896.44 8809.64 2748.77 3368.22 5952566.11 648710.24 11.88 3368.22 10571.00 94.20 80.70 8893.08 8806.28 2752.92 3403.80 5952570.95 648745.73 15.99 3403.80 10615.00 92.00 74.70 8890.70 8803.90 2762.28 3446.71 5952581.14 648788.45 14.50 3446.71 10646.00 92.50 69.50 8889.48 8802.68 2771.80 3476.17 5952591.22 648817.72 16.84 3476.17 10696.00 95.80 73.70 8885.86 8799.06 2787.54 3523.47 5952607.87 648864.71 10.66 3523.47 10722.00 95.90 77.20 8883.21 8796.41 2794.03 3548.51 5952614.85 648889.61 13.40 3548.51 10762.00 93.80 80.40 8879.83 8793.03 2801.77 3587.60 5952623.34 648928.54 9.54 3587.60 ObP BP Amoco Baker Hughes INTEQ Survey Report INTFQ Company: BP Amoco Date: 8/6/2001 Time: 10:06:29 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: Y-15, True North Site: PB Y Pad Vertical (TVD) Reference: 22: 15 4/2411983 00:00 86.8 Well: Y-15 Section CVS) Reference: Well (0.00N,0.00E,90.00Azi) Wellpath: Y-15A Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD SSTVD N/S E/W MapN MapE DLS VS ft deg deg ff ff ff ff ff ff deg/100ft ff 10792.00 92.90 86.30 8878.08 8791.28 2805.24 3617.33 5952627.38 648958.20 19.86 10836.00 94.10 91.30 8875.39 8788.59 2806.16 3661.22 5952629.15 649002.06 11.67 10868.00 93.60 96.90 8873.24 8786.44 2803.88 3693.06 5952627.48 649033.93 17.53 10939.00 97.50 103.90 8866.36 8779.56 2791.14 3762.51 5952616.09 649103.61 11.24 10979.00 99.80 107.40 8860.35 8773.55 2780.48 3800.58 5952606.17 649141.87 10.39 11024.00 97.40 113.80 8853.61 8766.81 2764.83 3842.20 5952591.32 649183.79 15.04 11058.00 93.30 113.10 8850.44 8763.64 2751.36 3873.25 5952578.46 649215.09 12.23 11093.00 90.40 110.20 8849.31 8762.51 2738.46 3905.76 5952566.19 649247.84 11.71 11128.00 89.50 106.40 8849.34 8762.54 2727.47 3938.98 5952555.84 649281.26 11.16 11165.00 91.30 102.50 8849.08 8762.28 2718.24 3974.80 5952547.31 649317.25 11,61 11205.00 93.90 98.30 8847.27 8760.47 2711.03 4014.09 5952540.86 649356.67 12.34 11255.00 94.80 90.90 8843.47 8756.67 2707.03 4063.75 5952537.82 649406.39 14.87 3617.33 3661.22 3693.06 3762.51 3800.58 3842.20 3873.25 3905.76 3938.98 3974.80 4014.09 4063.75 11294.00 95.60 87.40 8839.93 8753.13 2707.61 4102.58 5952539.15 649445.20 9.17 11328.00 93.60 84.20 8837.21 8750.41 2710.09 4136.37 5952542.28 649478.94 11.07 11385.00 92.30 79.00 8834.27 8747.47 2718.40 4192.67 5952551.68 649535.06 9.39 11415.00 89.40 80.40 8833.83 8747.03 2723.77 4222.17 5952557.61 649564.45 10.73 11454.00 88.30 84.60 8834.61 8747.81 2728.85 4260.82 5952563.44 649603.00 11.13 11492.00 88.30 90.20 8835.74 8748.94 2730.58 4298.75 5952565.90 649640.88 14.73 11522.00 87.10 92.70 8836.94 8750.14 2729.82 4328.72 5952565.72 649670.85 9.24 11564.00 86.90 99.30 8839.14 8752.34 2725.44 4370.41 5952562.14 649712.61 15.70 11595.00 87.80 104.60 8840.58 8753.78 2719.03 4400.69 5952556.32 649743.01 17.32 11654.00 84.00 112.70 8844.80 8758.00 2700.24 4456.40 5952538.61 649799.07 15.13 11684.00 82.10 114.50 8848.43 8761.63 2688.32 4483.68 5952527.22 649826.58 8.69 11748.00 81.70 122.50 8857.46 8770.66 2658.11 4539.32 5952498.10 649882.78 12.39 11770.00 81.40 125,40 8860.70 8773,90 2645.96 4557.37 5952486.30 649901.06 13.11 11820.00 78.30 130.60 8869.51 8782.71 2615.68 4596.14 5952456.78 649940.41 11.97 11855.00 73.60 126.10 8878.01 8791.21 2594.62 4622.74 5952436.23 649967.41 18.32 11905.00 66.30 121.50 8895.15 8808.35 2568.48 4661.71 5952410.85 650006.87 16.96 11934.00 63.10 118.30 8907.55 8820.75 2555.40 4684.43 5952398.22 650029.84 14.87 11974.00 61.10 113.40 8926.27 8839.47 2539.98 4716.22 5952383.42 650061.92 11.92 12019.00 61.10 113.40 8948.02 8861.22 2524.34 4752.38 5952368.48 650098.37 0.00 4102.58 4136.37 4192.67 4222.17 4260.82 4298.75 4328.72 4370.41 4400.69 4456.40 4483.68 4539.32 4557.37 4596.14 4622.74 4661.71 4684.43 4716.22 4752.38 ~lP REFERENCE INFORMATION Vertical (TVD/Reference: Syslem: Mean Sea Level Section 0/S Reference: Slot - 15 (000N,0 00E) Measured Deptl~ Reference: 22: 15 4/24/1983 00:00 8680 Calculation Melhod Minimum Cu~ature 8200 2900 ~2400 2600 2700 2800 2900 3000 3108 9200 3300 ~400 3500 3600 3700 3800 3900 4000 4100 4200 4300 4400 4~00 4600 470O 4800 4900 500O 5100 5200 West(-)/Eas~(+) [t OOft/in] :Ii 3000 3050 3100 3150 3200 3250 33O0 3350 3400 34-50 3500 95'50 3600 3650 9700 9750 9800 3850 3900 3950 4000 40~0 4100 4150 420O 4250 4300 4350 4400 4450 4500 ~550 4800 465O 470O 475O 4800 485O 49O0 8~6~200 1 AM 08/01/01 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 1345 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job # Log Description Date Blueline Sepia Prints CD D.S. 'l 8-28 ~ c./5 - c,~Tz-/' PSP-LDL 07122/01 I 1 B-30A -?~-- J ~35 21329 MCNL 06/25101 I I 1 E-35A ~_Ol-~l=/ 21333 MCNL 07103101 t I 1 K-10A ~ZOi'- O5~ 213,~1 MCNL 06/27101 1 1 1 D.S. 18-32A ~_crl-/p 7 21328 MCNL 0612110~ I 1 1 Y-15A '_7_0 j,-O~/ 21334 MCNL 07105101 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A'I-I-N: Sherrie RECEIVED AUG 0 5 ?.001 Received by: Oil & Gas Cons. Commission Anchorage ~'ONY KNOWLES, GOVERNOR 3,33 W. ~ AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Thomas McCarty CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage AK 99519 Re.' Prudhoe Bay Unit Y-15A BP Exploration (Alaska) Inc Permit No: 201-089 Sur Loc: 514' SNL, 599' EWL, Sec 34, T1 iN, R13E, UM Btmhote Loc. 2035' NSL, 206' EWL, Sec 26, T1 iN, R13E, UM Dear Mr. McCarty: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed priOr to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on. the North Slope pager at 659-3607. Sincerely, Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this/~'/~' day of May, 2001 j jo/Enclosures cc: Department offish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALAS KA " PERMIT TO DRILL 20 ~C 25.005 I [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [][] DrilIRe. Entry [][] ReddllDeepen lb. Type of well [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 86.80' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028286 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.O25) 514' SNL, 599' EWL, SEC. 34, T11N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 2114' NSL, 3538' EWL, SEC. 27, T11N, R13E, UM Y-15A Number 2S100302630-277 At total depth 9. Approximate spud date 2035' NSL, 206' EWL, SEC. 26, T11N, R13E, UM 06/10/01 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028287, 206' MDI No Close Approach 2560 12142' MD/8864' MD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 10140' MD Maximum Hole Angle 97 ° Maximum surface 2244 psig, At total depth (TVD) 8800' / 3300 psig 18. Casing Program Specifications Setting Depth Size To 3 Bottom Quantity of Cement Hole Casin,q Wei,qht Grade Couplin,q Len,qth MD TVD MD TVD (include sta,qe data) 3-3/4" 3-1/2. x 2-7/8. 9.3# x 4.6# L-80 ST-L 2442' 9700' 8481' 12142' 8864' 140 cu ft Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. IVi~Y i z~ Z 0 0 ] Present well condition summary Total depth: measured 10635 feet Plugs (measured) Alaska 0il & Gas Cons. Commission true vertical 9229 feet Anchorage Effective depth: measured 10581 feet Junk (measured) See Diagram. true vertical 8041 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110' Surface 2690' 13-3/8" 3816 cuft Arcticset III and Arcticset I 2690' 2690' Intermediate 9991' 9-5/8" 230 cu ft Class 'G', 130 cuft PF 'C' 9991' 8716' Production Liner 914' 7" 285 cuft Class 'G' 9711' - 10625' 8490' - 9221' Perforation depth: measured Open: 10010'- 10031', 10130'- 10180' Sqzd: 10128'- 10130', 10180'- 10202', 10214'- 10280' true vertical Open: 8731' - 8735', 8828' - 8868' Sqzd: 8826' - 8828', 8868' - 8886', 8895' - 8948' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Thomas McCarty, 564-5697 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Thomas McCart"'y/'~.~., ,, _ ~ /g"4''~'~-t~ ~ Title CT Drilling Engineer Date _~--i~~/ . ......:..:...:.;....;......:...... :.... .... .....:......:.:.:..;...:..: .:......:..........~.::..!..:::.:......!:.:.......... ..... , . ......:..:. :.: Com. mlssio:n.u,e:On:i...i:;..:...:.;:i..!...:::...!.;:,..... '::.'...:., :.: ........ :..:.: .:.: _: .........:;~......! ......... :.......::. ::..... "i~e'rmit Nu'mber ...... I'API Number ' Approval Date See cover letter · ~-o ? - ~ (~ ~- 150- 029-20940-01 .~ ,/~7, (~)/ for other requirements Conditions of Approval: Samples Required [] Yes l~ No Mud Log Required [] Yes J~ No Hydrogen Sulfide Measures J~ Yes [] No Directional Survey Required ,]~ Yes [] No Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K /']~.5K psi for CTU /f Other: ORIGINAL SIC-';.~.,. by order of ~Approved By D T~vlnr ¢,:.,,, Commissioner the commission Date ~'-,/~)~. ~ / iForm 10-401 Rev. 12-01-85 ORIGINAL Submit In Triplicate BPX Y-15A Sidetrack Summary of Operations: A CTD sidetrack of well Y-15 will be drilled. Specific prep work, (Phase 1) and drilling, (Phase 2) operations are detailed below. Phase 1: Isolate & integrity test inner annulus, (IA). Drift/caliper liner and set whipstock. Mill window if service coil is available. Planned for May 20, 2001 · Drift well with dummy whipstock and caliper liner near setting depth. · Integrity test IA after displacing to seawater & installing dummy gas lift valves. · Set through tubing whipstock using e-line at approx. 10,140' · Pump cement past the whipstock to P&A the existing perforations. · Mill window with service coil if available. Phase 2: Drill and Complete CTD sidetrack: Planned for June 10, 2001 2-3/8" coil will be used to drill a -2000 foot, 3-3,4'' open hole sidetrack, (as per attached plan) and run a solid, cemented & perforated 3-1/2" x 2-7/8" liner completion. Mud Program: · Phase 1: Seawater · Phase 2: Seawater and FIo-Pro (8.6 - 8.7 ppg) Disposal: · No annular injection on this well. · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 3-1/2", L-80, solid liner will be run from 9700'md (TOL, 8481 TVDss) to approx. 10,170'md and then crossed over to 2- 7/8",L-80, solid liner to TD at approx 12,142'md. Liner will be cemented in place with approximately 25bbls (annular volume plus 25% excess in OH) of 15.8ppg class G cement. Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2200 psi. Directional · See attached directional plan · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · An MWD Gamma Ray log will be run over the open hole section. · Real time resistivity may be run in the OH, if not, a memory resistivity log will be run after reaching TD. Hazards H2S was measured at 10 ppm on March 10, 2001. The well-path will cross 3 mapped faults. Offset wells indicate there is risk of lost circulation along the wellpath. Reservoir Pressure Res. press, is estimated to be 3300 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface is 2244 psi. WELLHEAD=- GRAU K~. ELF'V = 86.77' 'E~i'"~'"':: ................................... 50.97' KOP = 2988' '~X xh'g~'= ....... 39'~' ~tum MD = 13-3/8" CSG, 72#, L80, 0.1481 bpf, ID=12.3471d 2700' IMinimum ID = 3.725" @ 9736' 4-1/2" OTIS 'XN' NIPPLE Y-15 SAFETYI , ES - Wellhead completed with emergency slips on 9-5/8" CSG hanger. Do not press test 9-5/8" CSG hanger void above 70% of collapse of 9-5/8" CSG. 2074' Id4-1/2" OTIS SSSV Landing Nip, ID=-3.8131 2610' I--~ 13-3/8" x 9-5/8" DV PKR I GAS LIFT MANDRELS STAI MD I TVD I DEVITYPEMANI LATCH 5 I 5640151561 41I MERLA 4177581 67381 36 I MERLA 3 I ~S"l ~12~1 M~A 21~.q ~013oI M~_A II 96171 83241 33I MERLA 9647' H4-1/2" OTIS 'X' NIP, ID=3.813 I 4-1/2" TBG, 12.6#, L80, .0152 bpf, ID=3.958 Id 9667' ITOPOF 7" LNR I--I 9711' 9667' 9714' 1~Ig-s/~" ~v HBBP PKR, ID=4.0 I 14-1/2" Taitpipe, 12.6#, L80, .0152 bpf, ID=3.958 I--I 9747' 9-5/8" CSG, 47#, L80, .0732 bpf, ID=8.681 Id 9991' i PERFORATION SUMMARY REF LOG: GO-BHCS, 5/7/83 ANGLE AT TOP PERF: 137@ 10010 Note: Refer to Production DB for historical perf data 'SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8 6 10010-10031 O 5/96 3-3/8 6 10128-10130 S 2/93 3-3/8 6 10130-10180 O 2/93 3-3/8 6 10180-10202 S 2/93 3-3/8 6 10214-10254 S 2/93 3-1/8 4 10254-10280 S 2/93 I~1-I lO54O'I 10625'I 17,, LNR, 26#, L80, .0383 bpf, ID=6.276 Id L 9736' 9747' I-~4-1/2" OTIS 'XN' NiP, ID=3.725 I 1~4-1/2" OTIS WLEG, ID=3.854 I I 10142' HMAP, KERJOINT I 10267' I- 10360' J- 10640' I- FISH - 1-7/8" Wireline tool string 26' long covered up with frac sand FISH- 3 bow springs (16"x25"x5"), I spinner blade (.75"x75"x.125"), I tapered bull nose (6"xl.69") FISH- 3-3/8" Perf gun (34'), I bow spring centralizer (2'x1') DATE REV BY COMMENTS 1983 ORIGINAL COMPLETION 01/09/01 SlS-SLT CONVERTED TO CANVAS PRUDHOE BAY UNIT WELL: Y-15 PERMIT No: 183-0580 APl No: 50-029-20940-00 Sec. 27, 11N, 13E BP Exploration (Alaska) ACTL~TOR= OTIS '~i'"~"~"'~ 50.97' ..................................KOP = Max'Angle'= 39"@' '--? Datum MD = DatumTVD= I 13-3/8" CSG, 72#, L80, 0.1481 bpf, ID=12.3471d 2700' IMinimum Id = 3.725" @ 9736' 4-1/2" OTIS 'XN' NIPPLE Y'-15A proposed ST SAFETYI~. , ES - Wellhead completed with emergency slips on 9-5/8" CSG hanger. Do not press test 9-5/8" CSG hanger void above 70% of co,apse of 9-5/8" CSG. 2074' H4-1/2" OTIS SSSV Landing Nip, ID=3.813I 2610' I-'~ 13-3/8' x 9-5/8' DV PKR I GAS LIFT MANDRELS 15156401 51561 41I ME~_~ I 2 I 94471 81801 3°1 ME~_A I 1 196171 83241 331 MERLA 9647' I--!~-~" OTIS 'X' NIP, ID=3.813 I I 4-1/2" TBG, 12.6#, L80, .0152 bpf, ID=3.958 I~i 9667' ITOPOF 7" LNR I--~ 9711' 9667' 9714' 1~9-5/8. TIW HBBP~R, ID=-4.0 I ]d4-1/2" OTIS 'X' NIP, ID=3.813 I 9736' I~4-1/2" OTIS 'XN' NiP, ID=3.725 I I 4-1/2" Tailpipe, 12.6#, L80, .0152 bpf, ID=3.958 I-~ 9747' 9747' I---]4-1/2" OTIS WLEG, ID=3.854 I I 9726' I-I -M°I I19-5/8" CSG, 47#, L80, .0732 bpf, ID=8.681 Id 9991' I 10142' I--IMARKERJO'NT I KOP= 10,140 at 37deg Inc. PERFORATION SUMMARY REF LOG: GO-BHCS, 5/7/83 ANGLE AT TOP PERF: 137 @ 10010 I I -10170 Id 3-3/16"X2-7/8" I Note: Refer to Production DB for historical perf data 3_3/81 6 i 10010_10031 ..... :., ....:...... ,,, ITM I 6I10128-10130 I'~" 12142 I 13.3/81 6 i 10130.10180 .... 1 3-3/818 I10180-10202 I 2-7/8", 4.6#, L-80, STL LINER- Cemented & Perf'd ' I 3-3/8 I 6 I 10214-10254 10267' I-- FISH- 1-7/8"Wirelinetoolstring26' I 3-1/81 4 I 10254-10280 Iongcoveredupwithfracsand ~{ 10360' I-- FISH- 3 bow springs (16"x25"x5"), I 10 0, 1spinnerblade(.75"x75"x.125"), I tapered bull nose (6"xl.69") I 7" LNR, 26#, L80, .0383 bpf, 1D=6.276 Id 10625' 10540' I-- FISH- 3-3/8" Perf gun (34'), I bow spring centralizer (2'x1') I DATE REV BY COMMENTS 1983 ORIGINAL COMPLETION 01/09/01 SlS-SLT CONVERTED TO CANVAS 05/11/01 TMM Proposed CTD Sidetrack PRUDHOE BAY UNIT WELL: Y-15 PERMIT No: 183-0580 APl No: 50-029-20940-00 Sec. 27, 11N, 13E BP Exploration (Alaska) Vertical Section 0 50o 86o0 8650 Y-15 Path Distance [Feet) 1,500 2,000 2,500 3,500 Y-15L1 case 102 Jan. 24, 2001 ~8700 Ted x4694 ,8750 Angle @ K.O.:37 ~ deg MD:10140 8800 8850 8900 -ii~s Tot Drld:2002 fi' 12142 TD Marker Depths @Orig Wellborn Js^e I e,6351ftTVD TSHU I a,6651f*T O 8,74318,?43Jft TVD TSAD J 8,737Jfl TVD JKickOff J 8,749JftTVD 10,1401fl MD JDeprtr @KO 4,035 fl MD New Hole Total MD 12,142J TVD TD 8,864] DLS deg/lO0 Tool Face Length w. Curve I 28 20 220 Curve 2 10 -90 259 Curve 3 10 90 490 Curve 4 10 -90 375 Curve 5 10 110 349 Curve 6 10 145 309 2,002 Drawn: 1/24/2001 14:10 Plan Name: Case 122 Y-15 4,500 E Y-15L1 Case 102 Jan. 24, 2001 Ted x4694 ! I I 3,000 3,500 4,000 X distance from Sfc Loc JWell Name Y- 15 J CLOSURE IDistance 5,508 fl Az 61 deg NEW HOLE E/W (X) N/S (Y) Kick Off 2,959 2,72 ! TD 4,832 2,645 State Plane 650,228 5,952,398 Surface Loc 645,396 5,949,7,53 DLS deg/100 Tool Face Length Curve i ' 28 20 220! Curve 2 10 -90 259 Curve 3 10 90 490I Curve 4 10 -90 375~ Curve 5 10 110 349 Curve 6 10 145 309 2.002 Drawn: 1/24/2001 14:10 Plan Name: Case 122 CDR1 Drilling Wellhead 19.30' 21.10' 16. ~,~ Rig Floor 5.59' Dual T.O.T. 5,000 psi W.P. R~n Type Dual Gate BOPE ~ CT Injector Head Otis Q.C. thread half Traveling plate 5-1/2" lubricator Jacking Frame 4-'" Top Stationary Plate Annular BOP (Hydril),7-1/16" ID Annular BOP (Hydril),7-1/16" ID Top blind / shearI 2-7/8" - 3.5" Variable bore rams Kill Line I Top 2 7/8" pipe / slips I Btm 2 3~8" pipe / slips Manual Master Valve -- Tubing Hanger 9-5/8" Annulus 0.66' Rig Matt Ground Level 13-3/8" Annulus H 1 881 30 VENDOR ALASKAOILA O0 NET DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT 04 i 80 i C~041801E 100. O0 1 OO. O0 PYMT (;OMMENTS: Pe~it to D~ill l:ee HANDL:'NO INST: S/H - Te~ie Hubl~le X4&28 . --vi-. [1!~:..' BP EXPLORATION'(.ALASKA), INC. ,,RS, o~^...,,.. .NO', =-'O ::). OHIO :,- ,156;389 ,::,.:,i!':':? 412 'CONSOLIDATED COM MERC:IAL' ACCOUNT 1'30 ," I,R~ ~, ~,O," ':Oh ~, ;~O=,Rc~c~l: OORt, h l, cl," FIELD & POOL ~-Mr~.)~'c3 INIT CLASS "' WELL NAME~.~'~---y ,~-/'5'~ PROGRAM: exp day r,.~"' reddl ~ serv 4~,~...~' 2_ ~.,'/ ~c:=~"(g UNIT# ADMINISTRATION 1. Permit fee attached ....................... ENGINEERING wellbore sag 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available, in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can-be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... 14. Conductor string provided ................... 15. Surface casing protects all known USDWs .... ....... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons ..... ' ..... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ....... ; ..... AREA ann. disposal para req //4~'L~'~ .. ON/OFF SHORE 23. If diverter required, does it meet regulations .......... 24. Drilling.fluid program schematic & equip list adequate.. ~ . ' ~l'--m · 25. BOPEs, do they meet regulation ......... . . ~.~ .... ..., .. ,....,.. ,. . TE 26. BOPE press rating appropriate; test to -~%-~C~'~ Dsig. ~ ~ t~'-~' e~.;~'~_t-~ (~ ~t~,_~>~ .. p~TE ..~,. ~ 27. Choke manifold complies w/APl RP-53 (May 84) ......... 28. Work will occur without operation shutdown ........... Y 29. Is presence of H2S gas probable ................. GEOLOGY 30. Permit can be issued wlo hydrogen sulfide measures ...... Y N 31 Data presented on potential overpressure zones ....... ~~~.~ 32. Seismic analysis of shallow gas zones ............. .~.PR D~TE 33. Seabed condition survey (if off-shore) ............. ~_./.~/ 34. Contact name/phone for weekly progress reports [exploratory onl.~ Y N ' ' ~.NNULAR DISPOSAL35. With proper cementing records, this plan ', (A) will contain waste in a suitable receiving zonei ....... Y N ' ~,PPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the Well used for diSposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) Wi!I no_t circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N .......... . . GEOLOGY: ENGINEERING: UlClAnnular COMMISSION: . Comments/Instructions: . O Z O z -I- c:~nsoffice\wordia n~iana\checklist (rev. 11101//00) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this. , nature is accumulated at the end of the file under APPENDIXi .. . No Special'effort has been made to chronologically,'. ,, organize this category of information. **** REEL HEADER **** RWD 02/02/01 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** RWD 02/02/01 168209 01 13.125" USMPR *** LIS COMMENT RECORD *** Remark File Version 1.000 Extract File: ldwg.las -Version Information VERS. 1.20: WRAP. NO: -Well Information Block #MNEM.UNIT Data Type STRT.FT 10146.0000: STOP.FT 12041.0000: STEP.FT 0.5000: NULL. -999.2500: COMP. COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API . API NUMBER: ~Parameter Information Block #MNEM.UNIT SECT. 34 TOWN.N llN RANG. 13E PDAT. MSL EPD .F 0 LMF . RKB FAPD.F 86.80 DMF . KB EKB .F 86.80 EDF .F N/A EGL .F N/A CASE.F N/A OS1 . DIRECTIONAL -Remarks CWLS log ASCII Standard -VERSION 1.20 One line per frame Information Starting Depth Ending Depth Level Spacing Absent Value BP Exploration, Inc. Y-15A Prudhoe Bay Unit 514' SNL , 599' EWL North Slope Borough Alaska Baker Hughes INTEQ 3.125" USMPR 02-Jul-01 500292094001 Value .................. : : : : : : : : : : : : : (1) Ail depths are Measured Depths (MD) Gearhart Borehole Compensated Sonic, 07 May 1983 (last tie-in done the 01st of July between 13:05 hrs and 13:35 hrs, -1 ft correction applied before beggining of the logging). (2) Baker Hughes INTEQ Run 1 utilized Directional and Gamma surveys to drill formation from 10153' MD (8757' SSTVD) to 10296' MD (8820' SSTVD) in 3-3/4" hole. This section was relloged on Run 2. (3) After a Tie-in performed the 01st July 2001 between 00:48 hrs and 01:15 hrs, Gamma Ray data showed a 20 ft offset. All data recorded between 10153 ft MI Description ............................... Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 unless otherwise noted and are tied in to and 11672 ft MD (Bit Depth) were squeezed to fit between 10153 and 11652 ft. (4) Well Y-15A was drilled to TD at 12019' MD (8861' SSTVD) on Run 2. After depth shifting to PDC, TD was adjusted to 12041' MD (8861' SSTVD). (5) Well Y-15A was kicked off @ 10140' MD (8749' SSTVD) from the wellbore of Well Y-15. (6) The interval from 12022' MD (8852' SSTVD) to 12041' MD (8861' SSTVD) was not logged due to sensor to bit offset. (7) Flo-Pro mud was used to drill this section. The mud resistivity was 0.10 OHMM at BHCT. (8) The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) supplied by BPX (SWS, 05-Jul-01). (9) A Magnetic Declination correction of 26.57 degrees has been applied to the Directional Surveys. MNEMONICS: GRAM = Gamma Ray MWD-API [MWD] (MWD-API units) ROPS = Rate of Penetration, feet/hour TVD = Subsea True Vertical Depth (SSTVD), (feet) TCDM = Downhole Temperature [MWD], (deg F) RACLM = Resistivity Compensated 400 kHz Attenuation Resistivity Borehole Corrected [MWD], (ob_m-m) RPCLM = Resistivity Compensated 400 kHz Phase Difference Resistivity Borehole Corrected [MWD], (ohm-m) RACHM = Resistivity Compensated 2 MHz Attenuation Resistivity Borehole Corrected [MWD], (ob_m-m) RPCHM = Resistivity Compensated 2 MHz Phase Difference Resistivity Borehole Corrected [MWD], (ohm-m) SENSOR OFFSETS: RUN RESISTIVITY GAIVIMA DIRECTIONAL 2 23.93 ft. 17.12 ft. 37.33 ft. 3 24.05 ft. 17.24 ft. 37.45 ft. CURVE SHIFT DATA BASELINE 10157 5 10183 7 10211 2 10245 9 10340 6 10398 7 10428 7 10521 7 10544 10611 10673 10687 10699 10737 10746 10777 10797 10928 10948 11033 11063 11104 11207 11303 11366 11408 11452 11472 11562 11567 11716 11796 11830 11842 11872 11884 MEASURED, 10159.1 10186.5 10215.0 10250.4 10348.1 10404 3 10435 4 10529 6 0 10550 7 5 10620 7 1 10683 1 7 10697 5 .4 10709 8 .5 10745 2 .3 10753 8 .1 10787 8 .3 10809 4 9, 10942 5 9, 10963 3 3, 11049.3 7, 11081.0 4, 11120.3 7, 11227.1 7 11327.3 4 11386.4 1 11427 5, 3 11474 6, 1 11495 7, 0 11586 7, 9 11592 3, 1 11733 6, 8 11813 3, 8 11850 2, 9 11862 1, 0 11893 1, 6 11906 7, DISPLACEMENT 1.66895 2.71191 3.75488 4.58887 7.50879 5.63184 6.67480 7.92676 6.67480 9.17773 10.0127 9.80469 10.4297 7.71777 7.50977 10.6387 12 0986 13 5586 14 3936 16 0615 17 3135 15 8535 19 3994 23 5703 20 0254 19 3994 22 3193 23 5703 24 6133 24 4053 17 5215 16 4795 19.3994 19.1904 21.0684 22.1113 EOZ END ' BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 119 records... Minimum record length: Maximum record length: 10 bytes 138 bytes **** FILE HEADER **** RWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU ............................ WDFN mwd.xtf LCC 150 CN BP Exploration, Inc. WN Y-15A FN Prudhoe Bay Unit COUN North Slope Borough STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 1. The data presented has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by BPX 3. The PDC used is a Schlumberger Gamma Ray dated 05-Jul-01. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP .................................................... GRM GRM GRAM10 0.0 ROP ROP ROPS10 0.0 RAH RAH RACHM10 0.0 RAL RAL RACLM10 0.0 RPH RPH RPCHM10 0.0 RPL RPL RPCLM10 0.0 TCD TCD TCDM10 0.0 FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 32 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: IF ] Number of frames per record is: 31 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool 1 GRM RWD Code Samples Units Size Length 68 1 API 4 4 2 ROP RWD 68 1 F/HR 3 RAH RWD 68 1 OHMM 4 RAL RWD 68 1 OHMM 5 RPH RWD 68 1 OHMM 6 RPL RWD 68 1 OHMM 7 TCD RWD 68 1 degF Total Data Records: 123 Tape File Start Depth = 10146.000000 Tape File End Depth = 12041.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 137 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** FILE HEADER **** RWD .002 28 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN mwd.xtf LCC 150 CN BP Exploration, Inc. WN Y-15A FN Prudhoe Bay Unit COUN North Slope Boro STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is the unedited field raw data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GRAM GRAM GRAM 0.0 ROPS ROPS ROPS 0.0 RAHM RAHM RACHM 0.0 RALM RALM RACLM 0.0 RPHM RPHM RPCHM 0.0 RPLM RPLM RPCLM 0.0 TCDM TCDM TCDM 0.0 (TYPE# 64) Data record type is: 0 Datum Frame Size is: 32 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: IF ] Number of frames per record is: 31 One depth per frame (value= 0) * FORMAT RECORD Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units Size GRAM RWD 68 1 API ROPS RWD 68 1 F/HR RAHM RWD 68 1 OHMM RALM RWD 68 1 OHMM RPHM RWD 68 1 OHMM RPLM RWD 68 1 OHMM TCDM RWD 68 1 degF Length 4 4 4 4 4 4 4 4 4 4 4 4 4 4 28 Total Data Records: 65 Tape File Start Depth = Tape File End Depth = Tape File Level Spacing = Tape File Depth Units **** FILE TRAILER **** Tape Subfile: 3 Minimum record length: Maximum record length: 11046.000000 12041.000000 0.500000 = feet 79 records... 54 bytes 4124 bytes **** TAPE TRAILER **** RWD 02/02/01 168209 01 **** REEL TRAILER **** RWD 02/02/01 BHI 01 Tape Subfile: 4 Minimum record length: Maximum record length: 2 records... 132 bytes 132 bytes Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GRM RPH RPL 10146.0000 -999.2500 ROP TCD -999.2500 RAH 0.1972 RAL 0.131~ 0.0701 0.1965 155.3000 10146.5000 31.7202 -999.2500 6.7001 0.2955 155.3000 10200.0000 25.6464 111.2254 9.3954 9.1515 155.3000 10300.0000 17.5960 79.3004 8.6505 9.0764 155.3000 10400.0000 27.6452 45.7901 13.4136 11.9813 155.3000 10500.0000 34.3105 103.8716 13.6326 13.6858 158.0000 10600.0000 28.1579 95.9494 15.1361 15.0420 158.9000 10700.0000 23.5734 47.9314 14.3049 13.3048 162.2030 10800.0000 34.3262 107.4798 5.4912 6.0208 162.5000 10900.0000 23.3318 10.5764 4.6849 4.8665 165.8750 11000.0000 31.2247 115.3018 8.7247 8.6137 165.8750 11100.0000 38.5185 74.2816 18.5595 18.2227 165.8750 11200.0000 18.8344 122.0377 23.4001 22.1698 165.8750 11300.0000 28.6038 133.5630 17.4396 17.0873 169.2500 11400.0000 165.3081 82.6117 7.5050 46.5431 173.0171 11500.0000 37.0556 125.1004 25.1562 19.4964 172.8771 11600.0000 37.2736 148.0339 20.0153 18.6644 175.8493 11700.0000 24.0101 10.9033 10.3465 10.8453 176.4500 11800.0000 38.9196 79.4380 17.6879 16.2813 176.4500 11900.0000 34.6804 45.9208 20.8268 17.6170 176.4500 12000.0000 21.9743 93.4230 5.3347 5.0937 176.6750 12041.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = Tape File End Depth = Tape File Level Spacing = Tape File Depth Units = Tape Subfile 3 is type: LIS DEPTH GRAM RPHM RPLM 10146.000000 12041.000000 0.500000 feet ROPS TCDM 0.0699 8.5699 8.9555 10.6280 13.0898 14.8972 12.0243 6.0176 4.7842 8 0073 16 2342 19 0649 16 2964 15 3210 14 3425 15 7103 10 1975 14 2543 14.7995 4.8007 -999.2500 RAHM 0.4660 9 1875 10 2996 10 4501 13 1074 13 5934 12 1955 7 3578 5.9794 9.4979 16.3970 18.4352 15.1680 -999.2500 9.2870 13.4004 11.5886 15.5879 13.9279 5.2807 -999.2500 RALM Tape 11046.0000 26.3180 15.9870 16.6120 11046.5000 26.7160 15.8090 16.4890 11100.0000 30.3190 21.9200 20.4360 94.3520 165.8750 95.4780 165.8750 91.1520 165.8750 11200.0000 29.3330 92.5900 18.0510 17.3560 165.8750 11300.0000 28.2290 126.6650 19.4810 18.5790 169.2190 11400.0000 185.6280 79.2100 34.2130 32.0280 172.6260 11500.0000 26.5000 108.4430 23.1760 20.4620 173.0750 11600.0000 24.0870 113.5350 17.3020 16.1590 173.5350 11700.0000 23.7130 101.3250 8.7560 9.9160 176.4500 11800.0000 80.3430 83.7410 16.1750 16.7160 176.4500 11900.0000 24.3010 10.7580 11.3590 12000.0000 47.8930 -999.2500 -999.2500 12041.0000 -999.2500 -999.2500 -999.2500 Tape File Start Depth = Tape File End Depth = Tape File Level Spacing = Tape File Depth Units = Subfile 4 is type: LIS 82.4210 176.4500 93.0690 180.0500 -999.2500 -999.2500 11046.000000 12041.000000 0.500000 feet 15.8920 15.8990 17.0160 14.7970 15.9280 26.4580 16.9540 14.3890 10.5530 15.6960 11.3970 -999.2500 -999.2500 15 8140 15 8600 16 1150 15 5850 14 6470 8 3640 12.5780 12.3150 11.7570 18.2780 12.0650 -999.2500 -999.2500