Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout191-091 STATE OF ALASKA t ALASKA OIL AND GAS CONSERVATION COMMON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Repair Well Il Re-enter Susp Well 0 Other:OA Cement Squeeze 11 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 191-091 3. Address: P.O.Box 196612 Anchorage, Development I Exploratory ❑ AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22192-00-00 7. Property Designation(Lease Number): ADL 0365548 8. Well Name and Number: PRUDHOE BAY UN PTM P2-60 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PT MCINTYRE OIL p� 11.Present Well Condition Summary: RECEIVE D 13250 MAR I. 62017 i/ Total Depth: measured feet Plugs measured feet true vertical 9412 feet Junk measured feet AOGCC Effective Depth: measured 13149 feet Packer measured 12380 feet true vertical 9318 feet Packer true vertical 8608 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"Conductor 30-110 30-110 Surface 3120 13-3/8"68#L-80 28-3148 28-2788 5020 2260 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner 810 7"26#NT8OS 12418-13228 8643-9392 7240 5410 Perforation Depth: Measured depth: 12750 12820 feet 12842-12862 feet 12893-12913 feet True vertical depth: 8947-9012 feet feet 9033-9052 feet 9080-9099 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 25-12473 25-8692 Packers and SSSV(type,measured and 4-1/2"TIW HBBP Packer 12380 8608 true vertical depth) 4-1/2"BBE SSSV 2138 2063 12.Stimulation or cement squeeze summary: -, r.f Intervals treated(measured): CA��E0 „t: t J In OA:Surface-3148' 6`� Treatment descriptions including volumes used and final pressure: 10/16/16:15 Bbls 60/40 Methanol/Water,125 Bbls Fresh Water w/Surfactant Musol,15 Bbls 13.5 Spacer III,167 Bbls 15 ppg Class G Cement,51 Bbls Aggregate Pressure Seal,630 psi. 12/10/16:10 Bbls 14 ppg SqueezeCrete Cement,80 Bbls Fresh Water,130 psi. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 556 782 4904 2273 672 Subsequent to operation: 18 176 1702 2237 376 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations H Exploratory 0 Development Eff Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Il Gas ❑ WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG ❑ GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 316-436 Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature 14 Phone +1 907 564 4424 Date 3/16/17 VTI— /2-. 7J 7 / " ? oForm 10-404 Revised 5/2015 I/ Submit Original Only • • m a 0 0 0 0 0 co cocom0 N f— I— 0 N V V CO N- 0 y 0 0 0 0 0 0 L N N- (` cr co O 0 00 CO N m 0 CO CO CO 00 0 O CO V N N O CO — CO CO 0) CA I� O N- CA M N CO C O 00 O) 00 i ell H O O CO O CO f— — CO t LO ( NDN- (0N CO CO CO O C G1 N coicCOCOCOCO O Q. fO CON- N N- CV co N N CO N U a E i i i i i i CO Q ? CD CO r ch L CONNCON 1.0 C) NN CO _ .▪2 QM M '▪ LUO0 (n O Lco 0 CI 0 Cn 00 O O J O C = � ftZ � ZH *k „.7 0.)N o � N ZN o LL O M- Co\ 0 0\0 _ a N in O) Lc) O O V co Cn O Ocsic\I DOO O G) c') 000 c) J W W W Q Q Q H W 0 0 0 .5") O U W W W 0 0 ct et Et ct Z z c W W W W 0 w Z Z Z J H • • rn ' i � c aC) (> O > N fl co 0 ' O djO a3 U m co O) co L ° co E = N O C m O 0ai 0 a) N 0 m .NJ � o_ c• t_A ° cin tet°• � � co > ��\\ - Q O N II fl 0 _ N V c U co • > ( a) N o_Q) N U . 7 co a) z t — O N o ° > d a) U = Ty-) c O> N c� cn N > U Q In > O o a) c/) UU`` ©�1 lam° Q O p N a) U N -0 Q O V V O V* 0 '- O (I) } ` n m O c O � LLJ J J O a) O NLLI -0 O J Q O U Q > W w TIS LLIc6 ` COIJ c Cl) Ca N Y CO Q O a) J Q > Q O N d .8 Cl) (ten c_) Z Q 4- al Uj ao U U' .. WpUUO a) Cl) od O CO to .. co Q cCT o N o) II U \ .� N cu U 6 Q C� o a) •c U a 0- U Z Q LO N O c >- ) 7 U a 0 E. a) > cooQ ai w > a' a) �' 0 cX c Q o S2 OZ ° (0M C Ti0 o p 0 O in U E cu C co , o- o O — ai a) c W N d .� La J ` -O c O N N � c j co L a > > H o a) O L Q .�a o ° a o co II CDM � 0 = 0 - ti .t00 ° <-1°- ,...b. rno '� o 0a H Q C� o II > " > Q o o N ami 0 > II CO .S aoi m I �o o a U) co o 0 o ° o7:3_ o °- •3 a) Z I d ? To ._o_ > O rn O U Q c ami 0 aa) c o O com © aa)) ( .0 = D o -0 W C U > a o U H L L H ca J H (,� -c O a) O 2 C a) i- co Q 0 a) O cu o o O D Q .w ( c o cu > .0 p W 0 < CD (/) ° •0U 0)QU > � Q o cOQQN f° Q'7 ° D7 Qof il O m 2 o (o a) p rn I- II N cn c O L9 Q L20 _ m °) O .� 'o, 0 = oaoo (o o o v > 0 (N O >+> (i) > fn ) c = } C W Q cocoQ - QW cn Nv ca co d Q. 0 a .3 � 2 II u O -0 - E0u > a C � 0)-•,-,; TI),. Q � (n Q - CD = 0- t Q p 0-P a) • L c < 0 a_o o v Cl) - °o Ce a E ° 0 0 E o 0 E >, > 0 ami o c E ((f N }; o U Cl) c E IO-N 0 � H O H 0_ II H U II fl a Q� II > O a U �� E a II U J cn > x > - J o > . E c H O > as ii-d o c- x II o o o a) .a cD c o O a 6 c a) c S C > 0 (D a) O O > UCE OH pY i 2 0 .O U O O 0 o U co 7_ U ~ ._ O (D>. N c(oo CD eL M a) -0 oM c`a II CD II - = CD o c ,- o Tli a '' c U N > a) N > > N a) N O9_ -Q -c a) \ 'Y c O > rte-- N Op. 0 II p m(n ,, O O > H N- J N O I,- c w0 E0n > > O � N rE > Co � > II U) O U) (/) (n i j U (n 00 a L -Y ic) (n Q S > (n a) _ -o > (/) to +_ :E o D d)CI) O Y O oo II II Q II �' W• ISI Q Cr) ° 0_ •= O CD((I) II =O +V N L 0 * > O E O • m ° E .c 0 O II � O o O ° — O -its > � (o > � .N N > � O a) � ao � a) %-; -,,, DN O 7. )< < > H4 > (nH cn (AH o_.� U) HdD > Hin4DU H X - c 1- 000) W H Q co co co co co co co o O oCD 0 0 0 0 HN N N N N (N N N M M co Lc cc)> N N i= O O 0) O O O O 0 Q • al a)te �. a) U © 0 0 CD c -0 H c c ) 0 •0 E o Q * u) m m .E - 0 ') U) O CD- Ci) a) O »= 00 .� O N ._ NLL N a co N- f° II m a > d - a-0 0 - ° 0 2 (/) ID- op Qa aa) -0Q c- � Q o 0 � 0 Q- N -aQ ry � � � a � SO oN o -0 oa ° U) w 0 0) a) w C) a3 a) O O U II .O a) 1- .( C ELI (4‘i J a3 aj O Cn _ To U 4- .� O Q m o • > II 3 U E co d a) 0 = M o U) a3 3 ai C * . a� Tx, I- E > o Q — 0_ co ° N _o O Xa) > O N 0 N L O a) 0 _-co Q o c �r Q c > o O o ca E Q N ° 73 0 o a CO C •° _c a g a) a) > Q °' o p 06 a) ccocn atecn �U O QNO x V . o -c M o E � cna) as a) Q n ami O < c a'c o a) "' rn aQ a3 U E ac) O 0- D o o > >'00 2 E2o � cp03aioEC13 — ( mE * wca ,- o V c' to co o -9 a a) c L a) - c D ui rn o �- CC � o _0 a7 -C7 .0 w x — C • O E N � O c� °� Ci"- a `. LX-) E CO o 't 3 > -0 2 a3 N a0i .6 _ o_, r- = � .` �w •N o o Y a) o 0 a > WM �o 0 ID v) •o o p ai O o. o C o -o CO ai a 0 m a $ a a v d Q C a co co u) _ 2 c a) m cYi m _iV Q as c .n cci a o m c m rn al -cc .a) 0 U t 'Q- E ' 0 > Z' =n Q W 2 Z o N o m .c L cn > O N 0 O o O E o 2 m ` a 0 Q o Q E > a o v o o L Q a) cor) �' (n 5 p a i w o) E a— C as -p d > O = E cn a) O N C O 0 0 Q N L N o) rn o_ -CD > ` o w II Q o N c 4 o u4 II t m O-O .x a (n NZO .CN � a) 4- N II pO � oaf � .Q� � J a0 cIn •§ ' aco U � � 0 CO ca - 0oma o � 0 .E. N- C Ce Ce 0 0 0 o � � � � vch E0 ° O aa) o a) in a�s2N UO � 0 O u) rn c rn • 2 a3 O Q N N II vaj co E Q E c II Q _ c - _ o (ORE i-- aiO c Q m om > OO � rn O co 3 _0 a.S a.. ai L) -a .S i.L > o a u H 6 0 cod ZQ � 0 E (Dca o aio a3 � ._ � O � Qp a) p CQ � ~ — Zx- in0 Ecc) ` Oco m`t 8 �v •,.E. UJ Q-o • `n -a° - N c>u. — ° O 0QwO � c -0 Co L � 'Q wtc) 0C') ° D -0 �- c) > a) v . VOU � f- C Q (cu o C o 3 E io N O 0 © II 00 _ 0 c (Ni Tx/ C a> d O D Z E c E c a) a) Q 0- cn o > c U) -' N 2-it -5.- o a c o --=-- p E �o 0U) 0 ° -0 c° -0cn � -_S c-� u) oo o cn CO o � w � � wOU a) o U D)}• C co o 3 -.EH, L a) O Q wi a) J J Z U `C aa) a c - N (-1 a () m Q II c z° Q (moo w w (�i) m a) • E Q O w aE) cacti aE) o < o aE) cu — > >, 00 > - .Sow - @ •N m 0 > 1 2 0 3 •- 0 -000 o 01-:-• 0 a) - — v) H E .0 0 F- 0 o .c (1) * I- (i) * CO CO CO CO CO 0 0 0 0 N N O O O N N (N CD 0\ N N CO CO O O r S r r • • Q N O 111 0a) 0 < sZ c C * ch Co > E0_ T15 D 2i:3 cn O a) H 70 �\ >, (o W Q M O < V a) * ` a) (r) C Z Es 0 0 D I— ct 06 Z O LJL NN o CV W Q N Z TD c (/) O (o (o c V Z WQ V a O O C N m- - W _ O > O Q O J O II Z Z U) Q 2 oc0 O W Q "0a 0 } ca-E, O J mdQ o 0 .Eh zJ f- c a) � .S 0 0 p c >z Q o 2 0 a`) z C p = Q o 0 a) CD O d y 0 CO W Q �_ as avo z H D p N o c co o C CO N 0 0 3 m 3 0 u) o c c) O N 0 ( 2 - 0 u , W Oir) (0 (o II -0 Z U II (o CU 0- 2 o o c3 2 > m H CI Z = d N Q N > c) 2 co p v -a a) 0 ° � F- > Y Q m > -00 c O0. a � p _ a 0) a_ z M0Q _ � (D a � � � � a o d Z coWQ mcg c_ > OW �1 ❑ Wd 0 L_ a� u) v_ N U) a) .0 O (o U) ❑ m V CC W = a) iii 7 �4.1 Q N— =CO CO- ❑ din 3 EU) WQ ZpZ � C Dols (n .c 0 Q O H H H 2 v > � O a) ci) ❑ f— > Z —I O p U) � � a Q O Q V 4, a) x u) ❑ Z U) U _ (n _ CO J Q Q H (4 : �W � (n O W c .w _ c . I O 0 WcoWD 4* aMrCD a) corn * U) H ¢ ❑ ZU ❑ U) S � F2n oW5 II .n Q- O , HJHHN@a to > Uco J ❑ O � 2aZO II 0Q � O c W CI � OM° z cop ❑ In. +o (com > m � m co _0W ❑ e �o' u) _0 w aEi owv >+ n .- d- X00 NOQ E 5 cYFCp 0m ^N CMZ a3i _ 0--0, � H2 Q >O 11 CE- O ❑ H c .c NQQ - r z D . .moo ~ or- oo N000 O > > u) W I- LL_ UJ' ItHJLL' oto c1--c° OZ i O Baa_ � au=) o > -0o ° oo -aLOm0) 4A Z Z O W O Z OO co rnD ? ❑ Q Qd m p u_ o > c � ami o c °' 0000 N 0CT) Z XZ > �02co — H Ww zZmW W > Y . o Q � o ' o O � 2 U) a co 0 aH c ❑ - 2J U c eco cco tiroi) UI_ cCpp J Jp0 U) C t J " � 0_ EW � Ct � co -- 0coF II 0 � 2co N ,_ � Ha ❑ ❑ 00 � � II E °� � LLIH rip Qc= v � w II - CC E0_ II 0 II w 4CL » > WWD4 o Eo : cr ❑ (x1- ccww � � o � � � = � o ❑ O@ « ❑ dW WU) U) W + H O a) o_ * ❑ 2J < 3cocoo_ : I..= _c H _0L : H• *kFW co a (0 (0 (0 CO m r r r 0 0 r 0 0 0 0 N N N N N N N 0) O O CO CO 0) O N r f • • 3 U- \ ƒ — ¥ / ¥ \ f / ix k \ / E / % p/ 2c 00 m �\ _J U c 0 C / ± / / ± ® ° = o •- w 2 = y § \ / § 'E q § o L A R \. / 2/ (0/ / a/ a 0 0 e c E \ / / \ (Na) \ k f e o �� �� E e // E \ E t _o\ 2 0_ / o _1m am e 2 . - 2 > p p \ / 20 2 Cr) a-1 �-1 2 � / / 3 � a " m O � 0 � y2 0 � \ / 22 \ \ / / � / E2 �p E \ � � < » d / / / \ o \ / _ _1G - @M af9 — — mt = Er' > m •U) O � E / / ƒ p / p `- O -a j 0 O / 2 / d C 7 0 7 d / G % * \ ® 2 0 CD M .E 2 R 7 c 7 c H = t 9 - < 2 ".4_ >- 2a) / / wE / \ / \ / / � / / / « « / / . / < $ J / \ ƒ i / \ 0_ O / \/ - a \ a \ 0 _< / / \ ? co d / / @I / E $ ' ate 2c� ® � *2f � f \ / cc 8 .- / b / 2 $ / 2 .o \ » \ £ / o >, m .- ,- �� R n .- R r II n W < 0 / G ,— -c) Cri rt / / / d co 2 6 \ / \ \ E \ / \ / $ f / / \ \ / d / >, cio / / / _ \ a ® E $ ..... E $ A �� o = Oz \ / c / / •E = BAt / 9 t $ / \ - / » _ c4- a o ? % \ \ / k = E k •a 2 o J 9 R 4 Z E °\ C.) fa) a) © > / f \ E c R- > 2 II " O " ."-'a0 (:` ," ^ " ^ 7 $ ^ _ ± $ \ f 3 .2 f:1- (/)- O CO c / 7 co O — R _1 U $ c I \ k $ / / co©- 0 / ©.o $ / E i < / i i 72 E ƒ / / / / / / 0 CD CD 00 CD A g g A g t CD \ \ / / / • r o � (N C II ••(7O La. In to •C 1 ‘-- U' V Q) Q J O Z Ncn O Q co Q — >, N Z w Q m O � N C O U) C7) 0 -csW a) - ' -0 II c "iii = _7 Q U' a. m O Q O N< 75Q .c 0 p O a L o_ Q Z p s > (� O 0 f0 - Q Q CSV a) ca N O N 06 W O Q N C O N 0'5co . w 0 0 v G5 m o -p UvJ) 2 0_Com) '(9 Q m 3 0 J a) Q - N - o ') _c . b Za ' N o- am) L° = co - . - () �M w QO O N � � N Q0m � � _ ._ �� oc 00L9aa) � c 7 m w m (J) E Y a) L N 2 Q W d• a) o_- mD m v o a 0 Co O (n rn a`) ` c m 3 as •- c p-o ami o to pp N �- - c = rn:.-1C o U) I i a) ii 0) N H a) ai N U N CO N �- -� FW N N a Q N Q aoi cad E" w o_ 0 U)c ,4_ w -C U) QO ' m . a "d -O L MIN--I - o O N c c o V m CO .0 O Z 0 � Q O J a) c 0 0 a) .*k d G EHE -5' -le. —Fs > H L E O (gym nNcv) > * O a > z O Q > O Q O7 a > Z N H Q O O � Cfl o a) _ u) � w � � Q 3 � o QQ > - 00 - o ,- viu_ cr a) Z N 0 J � 2 a a) ° 2 O c �"z c c a a ID Q v a Q a� aco - aco - Q0_ co Q � - > U o " � a - N � 2N cQcM O * _c,tats a a) 0 a) M � U0 NO 1.r. � 0z F- Cvt� = Gr 0 := z * 2 a) II a) .4- 0 �� N p o Q Q CO X � co 2 �' N Q * M z +`. Q m I I Q n O C W COUCV • N � vN � � rJ UaCONOQ a) O _• O � aO u) * r * N LL LL _ N a * r Q (n NII _ Ce r 0Lo � � (I) � rr a) � � r U- I- rU) W7- U) W X . LL ' .- m EC W a) OO N t/I j � O a) j _ O � (n ' 2 � ' W - cn0N U) QQHL II F.. co W II U U �� p �' m ° > � Q � � �m � •c �' � pLiJC� zr � � oc ° a) o 15 0 d E :-,-3 2 QQ a OX Q O m 00 z m z °° co Q •� a O O U) � C) 7) cno .cU o �2O0 O c woD pr - >X = W = O o0OwQWwQHN a) a N � ^o n o Q = 2 CL wQ = N 2) Z0- W CN 11) j N , N Nm � aZZ c6 LU) > m U) m,_ N - N - N \ H o_ N 0 n > U) F. c- 1 Z - � > DI 7 .4 -1747 .4 rW c0 �o�II U) L_0n- U) N � J (nv JiJU) -ca00 � O II VU) _, = HJDHJHJD u) (/) UUHcO 0 m * Ct il v) W Q CCW Q W Q C L c[ * * W W * O > C N -c O : J CO .w U) a m U) a U) a m 13 J « : U) a H C U) H N L 4e U) H .0 CO CO CO CO CO r r 0 0 r r r N N O O O CN N (N N oo N N C r r N (N N r r r a- a- • • c L (1) Q CO J O Cl- L p a) a) c) a) L a) -a _ •- LL L E a) a) 'C L > la a7 > a) ,-.0 O a _c rn a (73 N O Q N (o 0- O to (O 73 CO > a) N C > 0 (D L- SON a) .. c oa. �- �c a) co o) m I L a) � c� O ot5 > I in co o c c) 2 c p O c . cn c) m V) a) co E N J O d U) O a L U) ; N L co aQaO /U.) ° ra ° a 0 �-o /C-) 3 @� N OQ -� U c $ c co C U aU C) _ a) = U — c N N U) a0 � m cca U' aa) _o .c 0)— c Q� CD a a) ci o -0 . 0 c_ Cl 0 - = co rn-5 Q C C) c o c O Ln c o _ CS o T co O o r a) CO C N U) p - a) 7 U) O N N a) N -a (Ni N 0 LL .0 N N (o L O !z C N II II O II t. --O � Q >Z I I 3 2 a) a,} Eat a a a) o_ c) a co Q� O d < Q ° C a N J = J CO J (Ni Q O !z p Q c c0 N O a) a) = O •c > N O !? a) > > co cn N N _N a) d N N 0 c� O " Eu) a) o O co co sco cn c a) — Cl) N z > a) u) CT Ca) c O °� �`N � E u)cn aa) _cc) ccoin.� w � Cr�� Cl) � � .a d v N L o O U) O a)-.-' -a _a a) O < a) O Q C O Q ( ao d J J P. 0 CO Q O O c Q ° N I< N O C M O a) Ln O '� O O a U w "a3 O a) M d "13 O . • cO - O C-N Q O `- a) -C N CO 'C a N r- O cn r- co O O O ° cn . M O Q O O U) p a) O a) O N Qin o_ o — ° N O cA "a O cL > • oGZu o -U _ U 0 Lc oo OOa . Oao Uc Lj o aa -oagQ (7, op 0cfi3a. 0 , mE � oa0 0 eL -0° 0a `- > 0a o � a ° jN >a) O E • -c II 2 II Qj N Oa) 2II po c � II 2 n > n � >t m °occl rna0 CO Oc d > O _ � O O _ 2 O� ' mW _..- 0- ° Q cm0 U /) Q Q ' QQCOmQ a v) 9,2 c _ Q 2 a) • E � � -q-) O 0_-0O � O = E � � � c c)- o0 EQU/) O E o0 EQ LO A = O N N N II a) m I1 a) c "O U �) •= a < II H O a) II H Q II a) (-) Q 11 > N :� c > ~ ai � 'U ° m•_� > mom_ �° H > o > c o > �-- p C-0 M a p T Q C a 3 0 7 `- C-Q O L o a) • o cao -.. o ca0 •o = UU) N - E = -0 M a, 1Z-- oU0o U 3U � o cU N Q 00 0 CL 0 _ > N ° > mNO a) Uo cr) II c ° UN a) > o "a Q> N >_ > N "t3 O > > N U) > 3 C w- `._ - m N > u U' O " > > U) > N U) V) 06 a) C-N U) U) C U) N O 2O 0 • C � U) .c U) U) co Q U) U) .0 U) U) co 4) U) >II 0 m N w -0 Ngo n c U ui U) a O) `) U) _a U) E) co - 0 ��, E 3 > OFio m ° QQ o ° E oo �o 0 •- Y O w II - & > �' O co O m a) E > o > - -V) >- - 11 -5 >- i— �- > — 1- U) _a mU>) H .cU>) U) .S - o 'o (2 CO) o_il .cU) F- Q � U) 1- .� U) HQ 3U>) O O O O O O (0 r r r r r r O O o 0 o O O N N N N N N0.1 O O O L— O O N N N N N N N • • _ m Q O C ° > Q O 0 _co co a) a _© U 0 O .N O Q E ° 2 ° rZ ° _> 3 0 .c > ©c) -io N U a Q a. •tn O a) > = O (/) cn II N 'C N L O U) �'-0 . W O a. a0 i J u % to � 0 3 � N � O > cco t- F- II 0_� => E vS L 0 cu O to a) a) O L = o O > v O Q U W 0- L m > Q Q c co a0 J U O -0 J N 2 a) > 0 O 3 a) m N Q co LL o CO fp_ 0 0 Q a. a 0 ° .ai , co Q ate) -a c°o 11 u Q O ° o 0) Q c a) L d o aaEi 0 -' 0 � C ._ m CYTO m U J O >; > -0O -Ca o Q °� 3 Q ° E a o m .° o ¢ a°) o 73 17- �0 v c Q c\I cd ti N a) N o 0 @� - o o ° _ o0 a) -0 o _ Y ° .� O III 11:r a)M a) a Q a) CO(o '�_ > -o N O N C 0 cn O V Q a O C 0 0 Q c Q J co 0 Cl) co a) m Q c C U O o C) a. U) 3 c to Q > m Lo _Cu L O O Y ° O N Q Q ° o c c ° o0 `� `o O 0 ors .o CO 0 < a) ° > Ny 0 O •LL — Q o in orsQ a tq acn n 0 ccoo - > ac) aaiv � � ccncn• > O = = NQOo 3 C 0 N O in > O c L tri c o cn C w II p Y a O �° a N a O c = o o o •L O M 13- U ) Q cci a cn a cY O N L a c a) Q o-a a`) o M Q cc n 000 0 a) a) io v ( C� a) Q o 0 o . ors O 2Q .= 00 0 0 • _ o 0a > � QEY >'� � NNo a°) io 0o c 0o) M - � � O v •c ca_ 0 o)U) cn • o E o > co r-: rn a) o00 �Et o O d cn _� 0 Eo c°'nL Lcn — 73 22 m -0 0 N � J > ` 002 a- a) c:)E O a) d ? O.•Q C0 O� O o •- Q0 — w o U c aci ai 0 0 •N O Q •E a C5 �j 0 ami m .E o C� ao O co a©.S c • = O - O o Q II F- 0 .u, I co a) • 0 H N L a '- •- vi 1 " m 0)co cn O -a °-v 0 in 't z o -0II O O m > ate) < ci) 0o a) = - 0 F a) u) ..-..:.• ° 2 QQ o Qin Ea < W - c`no O . .c cC� . - c' Q cn �co c � u°)i � 0 c 0 . -° O � N > 0 as w = IQ a Q 7 prp 10-7 U Q co o I I I IQ t.N -0 a) cOA O .C rn Q °-n) ii °-0 °- E - ° � .c >, j aEri a) a) . Ecn � 'E --`• E Ea � � o tea. a) 11 EYQ E aa)) in "a ° Ii 1 Q O ° a) a) c ° U m U ._ ° • ,_ II .� dF- p 0CJ CJ ~ ©FD -c EQ H -o >' c ._ Q0 . o0 > ~ Q a) - -o Q> oats o ix cn ri u_ 03 m o a) U o L t c ° o_ o o .S 2 0 0 � c aa)) '0 coo . r-- a) .75S .c cot a) O_ a) -c a) co E - L a) N O a U O > > oQ . c0 o 0 ' •v) QH -° o o Uo u) o 0� u U O CO O II N > E N O c a) a II N C O O fo +0 0 C II N II 07 O a) Y II j M c O M tl Q a) O > M L Q 0 -0 ° C 2 O > M L >, (..:2 -° 0 -04t 0 > � � > 0 > > Q C � M � > 3 N � 'rn � > io � ocncoco ° � - -00tH -O ai cn U) -0 "O U) 0 0)W u) a) 0) O .` O C O_u) u) a_ -0 v- u) r� ct a) w U) a U) a CD > O a) • c cn c„ .c z = a •c o (A a) o co c 0. o II N O II C C it 0)06 cn .17- a) II Q O co cB E ° II Q0 p N II O N M p 2 -E p 'o op .c > ao- 0 0 ) - c0-) 0 -o 'E CO 0 - o Esa. >- 1— .S 3v) i 001- 0 > .E - Tn. cco Hrt0 - x) -002 2 .0- c>n � m EcUnc>/) F- coo LE, 0U) co CO (.0CO o a r r r a- r-- CD O O O O C9CO C))) N N O r r o N N `-' N N N N N N N • 0 0 m Q o H Q Q a Q o NQ 2p No0 � 00 a) E II II o O CL Q c -o II O c ° E Q a d o 0 m�TS Q@ Q 'Q� E Q 0 Q cu Q m -0 E 0 0 c>3 C Lt V CT) > U a) ` L a) U o w O O _C c 0 Q U 0 '� 0 ucd °) _Ts IP > c ° o om o : > 0 © t < ,C a- u c°) aci = ai . " ._0 Q U -0 D — a C N Q Q N o w UO CO O p C U) . __ @.= O O C n 0 f0 U o O O (>3 .� a 3 N °i o a Q Q ° E > ° a) a o O o a) Ws -a c m 2 0 a) c rn_ < el .� co - c c ° L Q U 0Q • co a) C a) C O :Q O a § °_) p Q Q" ,-N. O ' N O 0 U 0 a) O > c Y 0 0 _ ° 0 r 11 O 0 > 0 > i° -° (0 N U 0 . � (O '0md No a a) U o fl'flii a m • cnus- 0co a ° 0 a) _0 0 N 0_ -0 „co 0 H c>s 0 Q c rn o _ (0 con + o c Va 0 m asM U 0 a 0 a) II LL O C C O O N 0 c •� O O O .0 _o r r _ t- � a 0c � � � �c• o � � a � � Q � Q Q �- c � 0 cca cod ° Vi ° Q •� m .MoID � C) voi 0 � p � Ci Qi_ <a. >> v � 0Q73 cu 0 Q4t ° -0 - - 0d00 CO < a) � < � cod < "" O O d ¢ -0 0 0 0 a) m o O ° c o v E E o 0 rn o — o v Q co Q N- C Q •cn E }' co a) r .. . 0 C1 Z > a. .cn c Q - a) 0- rn- 0 ° U 000_ 0 0) 0 ° rn >. Q....c U -a ( ) co LO < - Q O cnp0 0 .c O c O U O 0 a) .0 a - 0 co II — E O II 2 Q a 0_ II � - Il d II O m 1-1-1 Ln m E Ex -0 0 a coo • ' Q p < = a) < I c° < I C0 < CL c0 Q 0 O a) m ©� �S� Q c 0 O mp L 0 -C 0 fl. Q J Q ° c a`) � � cA• � � � � oaQcn o) Qcn � Q uj0 QUO Q a'CD p cn in c 15 cL Nt w IQQ c CS o- O IQ_ O II 0. m •p ' > O II > O �' E rn� o ami o 70 E > ° ° Q `� II E II a n u n .� I- O CQ rn o > N H > . QO o2Hd > H - � H rn a) > H > CI CL C to O C C o ° .N a) CO 12 (n O O- ° v 0 p O Q 0 to to v 0 co_ E0 o •� Ln }' d o a.Ocoo0S Uin cu C.) d co Uco 'cU CO > U U c) O () O .c7) c < I I + I I + 't I I o U I I o U a) I I co > -in v' a) a o 0Lo 0 ° II o O a_) o >. o H > o � > '- _� > '- _Ud o ��\\ L U) U) > L (n > OC') Y Q� N 0 a) 0 N- V Q N co 3 V) N- •aj U) U) � (� U) � �U) U) � N U) o -° a) a)a 0 r U) 0 E a) O 0).° r U U) U) •-- U) .( rn C C C IJ II C II II II cII O ° cO ¢ oL � cp . 00 ° - oDEo :� a � c .= . N N > UE V _ O > Z a) > LC) u > LU C > H Et cn O L H O U) I- (1) H o U) H N o U) H N z U) r` r` r` r` r` r r r r r ,--- 0 o O 0 0 0 0 N N N N N N r r r r r r r r • • Y Q ° Q a) Q_ >ii 0 d rn < < -DQ 0 (D N - Cl) J c O L O o O O C a' E > o c Q a) > c a Q a) a) • > II 0 U O N 7 0) O Q j > -O L C m fA a) `�`— N ate) a ai cn c -0 0 ai ( > ° .O c N N c a > o c Q o u)co caa) a) `Cm Um a) a)a) U) _c >as I Uoc � E a) 0 Oa Uv`� 1- Oa _ - C O > @� ) ._ o E E '7) U) v c 0 L O UU) UO Z c U) N a U 0 I) (n o rn N a°i v°i ii - z O c) .o Q o Q rn 6 C fn < f0 C c O y W O W co L °" U N O 0 a) a) C L rn p `�co O O O L •u) O • > cn -0 U a) C a L O c 0 0_ 0_ 7 0 MI E N c a) c E cA N = 0 r= D E O N c o ��O11 u) N �l N U > O .( -0 0 > II > u) -O • u) N O E II 7 V N O `'-'" c Q N N C O Q (0 Cl_ a) a) co 0 a cn E a 0-N (n 6 > L •C .0 O > J O O O - LO - J O O < 2 > a \ 0 > = C f° cd > < -a -0 (n •c Q °-`- 0 (J) CL. .- o W Ec • ° a) v) a) 1 E . 0 cD a) 0 N to a) _ N a N O 0a) C t/j �p p �_ O a) p) II 00 O C to a) C Q C a a) C a) -0 C m M c0 U y m to O . _ _ Q) 0 < > � '- 7o a)a) m o ac o < ,u) aai ° Q3f2 - N o o � L a0 � Q � � _c0 � Q TT) o a°) o w � •c 0 � 0 -U)) � - • aQ a�i � Ga � � (N II C) 06 � O > p o u' -0 O 0 -0 U) co o cn C �o 0 J O a) O O aEl I- - w a W 'cn � a '- - U) o - o Nin 05 vi- � c c oCL > �� o f ii O a 0 0 c`n To 05 •g og .— Ep a) QM . c II L o c u Z o 00- + < WC� o m C7 ovOa cn � Q 'wots o QO N LSO aOi O j m en a a) H Q O H a) H o_� � Q °-� c-— off._ a) sz (n O 0 0 cn O .ca = = � ,_ � p Q = w I m •._ c E 11 II aU) w O a 06 O m ami uOi ° 0 0 a`�i a�'i cNYi Q r C W � � OmM .c 0 � -c <1 cu a°') Om aria Eo 13 -c a�'i ami o ° oO � 2 00 < 6 L W Q . C a) U) 0 U > m _c,'-a) C 11 a) !� II re =OU) U Eo c — v) m — tea c � � a - a m 0) a) as cnOa = o° 2 I1 ; 0 Il '.- 6E0 " ai 0 II -c 0 II < 0 , 11 < _0 < 0_ c o U �, II Q II > II EO II E0 ami c0 a0 -0 o Y oU ami o I • �} 0 •c m > m > m a) • < o o U 0 m o o II Cr)) u Q€13 a c � C 2 H 2H U }, aH U I ca > o .cots > fn p L_ E C N U as C U) C U a) U O pOj U) M V) co U) cU U cu ' o ca _c c o `g U E � � � .� g U EU ° 'tU � � U � � m E cn •t OM � c,.) a) a) � O a) II O a) -0 0_ II p a) It p ° II p I E p p 0 c U M 0 p = - 0 1- _v p > -7 m a9 CO > 7- _v p > n > N O N O N O N O N 0 a ca „Nw— C H M) C > cn � U />/1 �_ 12 u) u7 u)) >/� � �(I) > — N '— �>/� N a) >/1 2 co Ex— O > a3 00 U) N U) U) L O U) U) O U) U) -0 U) U) 'O .c -0 U) a •— a) O U) -O U N C a) U) _ U) U) cn Z a) U) •-- 0) U) a) U) a) 0 a) U) 0 N a) C U) II 0 II O II ° II C II c N C II c N 0)ON II C C .� II V .2 C -c ao as 0p - OO4 a) 0Os 0 a) 0 O •- 0 N c — 0 a) E }• el_ O ca a O 0 — L U -- O U E E Q•c E Q•C > E E •cn O a) t ° C in C > 7 N O 0 > — LO c > — a) > — a) O O a) O 15 V) a) 0 O 0_> 7 0 >.- 1— N 7 (nH .��. .— U) HN OU) H UU) HU LUHU c' aU) H U U 0.0 OU) H v) — U) N- N- N- N- N- (` N r r c- r r r c- r O O O O O O O O O ,- N (C) N- N- O) r r r r w— r— r • • CL C, Q aCi � • 0W `- o � © � c W 0 u� �' o o° - - o o II N 8 m E a) �o o_ a) as a co ° � o QQ (no nJ � o � Qo coc Ts a) < L mO •- U Q (7) -a . ,V > V_)-- a C fII0_ Q O 0 y o o L O L 6 o c Q ll E a a) L N U 0 O U 0 0 _ O U a) — (n E O c L N aa)i v) 4- - .-SIO � < cn _ 0 a "_C) c > c(1) c\i ` • o o •N (a 0 (0 = 0 = O c 3 O U o Q U � (Oj p N O Q L C > .6 c c a) aj> N O Q°� al Q co N Q Ui > 0 o a " 5o o >,- c d Q >_ c > m o o c -0 O Q E O Q> > Q am Q -o N• • Oyo •� as .NO co co N •7, + > 0 n Qo O a Q E v o 0 O QN C CO o m (n = o a 2, •c m sz O a) a_ i O (n N (Yj O O •7, D c a3 d o 0 N _m a) c a)_O O co (o O_ F- (o +. (n Q m LY o . Y � o 1- T) 0o Q � .c o > 73 � Q �Q o o o co o a) ` ONO6 C o " O L d o N c o as rn (pc 3 cad aa) 2 3o Q °' m °ts o o > o oI c 0 a) > L o Q O M Q o E o o > in O N == E O O >> o V T (0 `- 8 �C () (0 O 4-- O L "a = > -a M "a Uo> E U c �`Y p> -c j O F- O U 0)-0E O = C O O• C o ,� C a > N `C - v 0 N c a) m O 0 N a) a) a) m N _8 Co = U " _ U i a L c (n m aa) N N a) (n m o O D (�, U m o c }' N CL cn t f0 m II o N U -11 u) 0 7 0 co CL QCI) aa) v) Q M Q o Q v 12) CC I I O 2 L Cl_ 00 I I N I Vi N O I I N -0 -o c LO (/) 4- I O I I - v > => I I > tri C Q" 2 Q ) i a co a +. a) a) t o o Q a) N o=5 co (o - a a) O il d aE) aa)) Q� `- a0i aa)) Q� � � a) o mu) IQ � � � a) rnQ o >>c � (Un � m j � co 1- c O L co 1- E O 1 E _a „ o E N I-' ai .E o 8 > 11 F- ai ui 0 G1 m E E oo Ham.• " oo c0 .• 0o c > FO- I 3 a�i � . • � E � 0 > deo °' I- } o 0 c .- • •= 0 o � 110 o0 << cUnOY- QO :o N v c 00 - u_ .0 •C0 � 0 i N -0 c (o II II C a .7) 0y co cm 5 O O u U • Nin o' O •- a) a) * * N o E -0 (n m nO o m o o ca .o �0 Q > o a O o o 0-00 fl-� .a ° O - rn u) Q-a v ami 0 CL a 0 0 2_LLI a_- c a o � ,� L -c Q o > m o = Q (� o o Q o - o ,, U Q c._ a) U � .s o� Q d 2 0 0' U a) a U N c U0 — Y a) )-EL a o N : 2 0 o ca c o c d E - or) ° - or)E L > E U E Q-w O � poca ° 2YOoo0oc0 oorn � 0 ._ a) aiOoa < OoOoa0000 >I = CO "a O L O 11 M > O L U II M N N .` Li: II Q > (73 II co U O O co II > U 0 U O ai �p II � o mo ” > � Uo) w o > c� rn = > o co > > o < oo (,.> > 0 a") `o c > `L° @ - •- UMcnY � MU ,- .( > •c- .cUo o � •Uo > Qrn0N- N * � > o CO .) CO oQ > i oQ Q] L) 0 > o o-> m o > Lo > ON 11 NiON 2 aN) 4 To II > � 0 � w > QUO co ai ESO o2 °� � u) - , o U � o > u) .Q >� v �a _,e o o v) v>) o (n o �a ami (� (n > X Cr 0 L 4=.' C)(n II 00 to O > I1 (n O II J O o w 1I -- m N N II > . II .- _a c N 0 (n > -a 2) 0a_ > -o 2 0 < •Ec') 0 - o o - ui c = O 2O -1 -a a) U F- II > 2 .g. (>/) F- Q > 2 .5 (u) 0_0 � (� � c =5HQ rnMU) � - a� Qm co.) c (> N. r ti rN- N- _N- co r r r r N N O O O O O _ N N N N N CO N N Cr 0 CO N- N- N N N N N • • co O 0) II o — II < C a < < C 0 O O o rn 0 Lo J . ' w 0 L u) c N O �`O J N Q N N ao U 2 mo O N II V U J CI- Qcci- Lc) - IL O N _@ L N cu z ( C) Q CO > N • C a w t a) o c o Co ° a �C) CV ` O * 0_ - a) E II a) -c (Na Na • Va cn Q Q E co -, o0 00 0_ o o c 6 co N co o win Es-, U 00 Co o o = O N • v r�� M 0 u' O 0 •U5 d -I oo ¢ Q -0 c J o LJ II (,.) m o o 0_ 2 : -0 Q a) N.- O n LL c Jw N o - o Q o o II :c o �� ° - ca U- = II y Q= 0 u) ILr) o 00 0 lata c c LO - - -Io O 3 O 1) N 0 N O CO 0 •a) a) o Q O M O L a II II < �) II +' C O C O N o O 00 L() U N N O O c - 0 c 0 • II II Lo C O E) o -0 QL�1 Jo252 °� --I < as ___1 0- OH - OU d co to 4_,0 '9 C _• Jo > EQ o Q JN To U ¢ rn C W W < (3- . -- � CoIL c > N O . O QO v, a co (n Q) N a (n co • o 0- a' N (n0 00- c -0 wa- oo u) 'n in oa 20 L a d c-`o O O w M — cm N O > Na OCS ° Co N c o cr O o o o 6 < o_ rn G U -o wN O v0 toa0a (n06c) M SrJ OIJJ (n MO LC) O aF-MF- ZijC .c7, = m0N = W C = 0u) Oin = a.ON U") -I O06I N (0 0 CO a) o +. 0 Z L�o ami C7 C7 ,- (9 (.5 o C ,u' 0_ •0 II •CD 0 t3 • CD a C5 >. = ' C7 ?' ,_ aa) 2) a) m 0 < �u�i0 0-"Caa_ 0vo 200 LLOUOIJLO a) O > o Oa _c O C N o Q O 0 +. Co CO Q a. to > N • 2 O Q Q U II II a. O II c N II 2 II Q 4) II . II N II > II ti 'E coi Oco NcN0 v-i � � O E U) o � 00 d0o • 2 & 0 � 0 ii 00 _ 0 0 o O co 0 CA O 0 a) CO M O O ,-0 - IQoo - Q O i Q N 2 IQo < IIIA I I Q- " M� Q 0 O5 Q O Q W o IQ ( •0- O aE —tow � w0 = - E 0 ENO E 0) off II Cop E 0 A = E z 4- C II H < II Q LU J II O c H U II F 2 II a) a c II • ---I in II a) s II m (n o _ > > EJ > -OE Li > > F- " > N -Joe > ~ a > d ~ o vS �c713 � � •a) a)) a)• 02 ai N -i orn2o � �2v � 2oo � 2 16 -0 c - 6 U) CO II - • T -E0 C) O `C U) d t O U) C 6----(17. O N (n O (6 0 (n cM O O (n p (n U C) + c U II O . (n - D 4_ W N U a Now = II w 00 -0 (9 ( M -0 (9 w M N H O a) to N O O O * (VII (B N N CAN N CAN CD - - >2 •C > E ' o � o ° O ° a > � aoa N QNO N .Co � aCU > � U - .- o > M 0 O 0 6) > OW o > NO 7 D > M D j II (n O (n U) Q '- p > CO a) • O N a) N o ,- 13 O N O (n • I 0 0- O u c 0 u c 0 0 II 0 u a 0 u o U II ( EU II 7 0)> Lu N , 0 0 > ' O a) II O 0 n O Q O c II 0 II II O — II O — 0 II a) • O C) -I N 0 N O � N (A00 0-L" a) > - a) w- > - CL) o - ' > - LU > - > > - ni O > F- 0-N- 7 (/) O) H U U) U N U) H- c- c h-- (n H J (n 5. -E (n E (n H O (n O O O O O O O O O N N N N N N N N N V co co co O) O N N V r N N N N N N N N N (N (N N N • • mQ in w > 0 0 c o a z 0 a) ..cN J To cd a) II @o (n a) 'y (n -c cm co co > p)04 j N c c CL cn O U • co ` @� J -O o `o .to COO1 OL Q E N Q—O Q Q (1 IL c co05 OON .00 0 ° 0O > Q Q co c � va no 73 Lo - (L > >Oor` 2o e O •� © O a (1) O N ceL .co— as c CO @�;; 00 � m .� > 00 � Q c ao �\ c Q c O p ^ Oco a) p a) � a) O V._ O O N C Y N a) Cr) N (A a) (o_O d o c o a) Q O a J w al Q N J o a. Q U -° -O vi N o m cr-E 11 7 Q O - CO Q o J 0 a) L J a) a) m 0 ai a) C a � Qa) - 11 Q ° � v Q °) o ai ° min E Q o o in m -0 o w U o ! a o 6 w w _c - a) u) (o 5 C }L`, OM °� _co CO0J d w 3 °- • .() O 0 (n ? aa) 0) m II — (A a 0 0 O o n. Q c 0 o a -C d >' a o Q c c o < ) CC) N `o aa)) Cl) pQ 11 J Ti.)- ¢ 5 JNO>D o `C a.-° a) co O 2 a EQD C Q o Q a N x . (o._ L a) LL— p O ^� o ° o .N o o < .( c I c > OS d aa)i U (a > _ a) o > o CT) Q a o c > o cno a°o af°i ° Q L. M o-d a) OO a) Op N+L. a) V Oc.oO Q II 00 W ° Tp0 Q 1_ N a. 0 cci a) O Cci w c OM a- •c a iii °6 O a) .S O iii 'J Q a) U > O Od (no . -p -c ' a. o .: E oa a6a) (oao a Oa= ° CL co 'v, ZO 11 2U U Q n � (0Q Q aai 0_ -7-3 E2 -0 co E > (nom m CL M � 2 0 a � 0 a. OU1- a. v („ 0 0O ami °) X 00 H Q > a) = o0aj � O a Q o N I I D II O II m m rn II a Y E o Qo ' m . 00 . O _ UO . acl- Q _ � � Ocn � *- �•S •0, 0 0_0- °° _ � � s aEi Q. OILI � N Fp <- � a. Q � o0c� c 3Q IQin * � � ooQ v) aci ° Q c &D) can) d 2 °-N rn CL O_CD Q as E CO . c a a. Z. 0 ', c > `) cep aE) 0 `n0 E) 11 0 E) 20 E < 0 ° eco , •- TO 4- CO a) > a ° H0o (� 2 o o > E .- c ~ o a. > ~ N > ~ 0 11 ~ o6 m> •OCDcr, E co H � Y � o Cl aoo u _ Loo2rn Q� o 00 o c . co o 0 = _ -0 o In J c) LLI 2 U CO o O (0 N c O o V 0 N N N U N O ° O o 0 M J N II Lo O II lLo ii U co o ii 0 M 7 0 Q Q II O N U L U O ° (No a > rnN > O) N II rn 00 > •—co c-, }EH5QO > N Q c OQ t (f) -0 u O 6w U) 11 CU) a � c>i) (I) al0 (1) CD7,, 0 00� m � si.? •9 = > � (co U u) (n cn N cn o U U a) U N co E m U u/) U (n o co Z' u � n II c: i i c � a @�U) o C I I O - oo U > cc o O N - Oo O J O ' QIL � � EY v O a0 � (nY E � — +' a) > : O > — w > — a. Q_ > — * * o c c > — d Q N o .L F- (n F'- II u) H— J (n H Q a. (n H Q : : 4- 7 (n I- a. 7 2 d 2 O1 >> tiN N- N- C) C) O O O O O CNNt. CV N N N N N N N 0) O0 N N M CO CO M i:-.0- • 0 _o a_ Q = — ca a _gym cQ (7) El Eo J ._II Q (A c 0 N — a w co •U 0 � !Z _ c) Ma .L 5 O ..4- O O (B 0 c II Q LL. co a - (N 2' N Q 4# (N O)'(D WO D CL _ .- "0w J M L �N I— O d " ccC) @�0- 2 ''47.. nl J Q O E O i aQQTSC c o D Q. QUO Fa(1) � 1- a, 0 � � a, o a) t - ° am . m a) � m ( Q oac com0- WvC OTo Q. O it N -0N Q . in , 06 �_' O 0 U > (u C wW 0 CSI 13_ ai ..O N U a) a) Q — cr a_ N — N Lt N a N c) ' M Q U - 0 m co (LD N (of II I O § = C� 0) N \J� a) E 0- -" ly>^, c L L O 0 N L V/ a) N co -.--' c0 U _ 0- ca °r5 N co >� a0 Q c U) II mc �2. 2 � > )) C) C 0) 0) O Q_0 v) 2 in cam) > U) v U) � 0 n. 7, 0_ U) F- co 0 co 7 W c> (.0 LL cM- c- N U I- LLL. 1"-- ,- 0 W OW N to ti M .. TREE= FMC III SAFETY NOTES:WELL REQUIRES A SSSV. WELLHEAD= FMC P2-60 ACTUATOR= BAKER C OKB.ELEV= 39.11' BF.ELEV KOP= 1126' OA c vENTED TO --F-11/ X Max Angle= 56°@ 6400' SURFACE(12/10/16) 1, / X 2137' 4-1/2'OTIS HXO SVLN,D=3.812', Datum NO= 12633' /• Q WRSSSV RAN 6/22/00 Datum TVD= 8800'SS 11 11 , GAS LFT 13-3/8"(SG,68#,L-80,D=12.415"J—{ 3148' 1 AST MD TVD DEV TYPE MVAL LATCH FORT DATE 1 3510 3008 53 0115 DOME 12 16 11/09/16 Minimum ID = 3.726" 12460' 2 8123 5713 54 OTIS So T2 26 11/09/16 3 10523 7185 50 0115 DMY T2 0 02/10/16 PARKER SWN NIPPLE _ L 4 11698 8026 35 OTIS DMY T2 0 05/05/00 5 12161 8416 29 OTIS DMY T2 0 08/12/91 6 12348 8580 27 OTIS CM/ T2 0 08/12/91 I III 12378' J4-1/2"PARKER SWS NIP,D=3.813" Z 12387' H9-5/8"X 4-1/2"TM/HB-BP PKR,ID=4.0" TOP OF 7"LM —{ 12420' — , 12439' H4-112'PARKER SWS NP,D=3.813" ' 12460' —4-1/2"PARKER SWN NP,D=3.725" 4-1/2"TBG-FC, 12.6#,L-80,.0152 bpf,D=3.958" H 12471' 12471' H4-112"TUBt4G TAIL,WIEGJ 12460' —{E-MD TT LOGGED 02/24/01 9-5/8"CSG,47#,L-80,D=8.681" H 12737' A ' PERFORATION SUMMARY REF LOG:DIUSFUGR ON 08/05/91 ANGLE AT TOP FERE:21'@ 12750' Note:Refer to Roduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 12750-12820 0 11/14/93 3-3/8" 6 12842-12862 0 11/14/93 3-3/8" 6 12893-12913 0 07/09/02 FISH:BAIT SUB CATCHER SET 02/09/16- — 13102'CTM OAL=31'w14-1/2"G FISH NECK-SEE WELL FOLDER FOR FULLOMENSIONS(02/23/16) PUSHED DH(03/21/16) PBTD —{ 13149' • • •• 7"LNR,29#,L-80,0.0371 bpf,D=6.184" —{ 13230' 0.0.0.41 DATE DATE REV BY COMMENTS DATE REV BY COMMENT'S POINT MC 1N Y RE UNIT 08/12/91 ORIG COWL-WAS PM-13 03/31/16 NLW/JMD SET PXN PLUG(03/29/16) WELL: P2-60 02/22/01 SIS-MD FINAL 10/21/16 DMS/JMD CMT OA(10/16/16) PERMIT No: `1910910 09/04/01 RN/TP CORRECTIONS 11/17/16 MAD RESTRAPPED OA CMT(11/10/19) AR No: 50-029-22192-00 02/24/16 JTG/JMD SET FISH BATT SUB CATCHER(2/911E 11/17/16 JTG/JMD PULL PLUG/GLV C/O(11/10/16) SEC 14,T12N,R14E,520'FNL&1023'FWL 03/24/16 ALM'JMD PUSHED FISH DH(03/21/16) 03/02/17 DS/JMD CMT OA TO SURFACE(12/10/16) BP Exploration(Alaska) • ! Quick, Michael J (DOA) From: Quick, Michael J (DOA) Sent: Thursday, November 10, 2016 2:22 PM h 1 2S To: 'Worthington, Aras J' PTA) r �" Cc: Schwartz, Guy L (DOA) Subject: RE: MITOAs P"rD. 2 D b -- D ci‘ Oat Aras- K.1 - You are approved to not perform the MIT-OA as was outlined in your procedure,on these 3 sundry's. Michael Quick Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commissionr f„a3 333 West 7th Avenue SCANNED iy,i i I L u I Anchorage,AK 99501 (907)793-1231(phone) (907)276-7542(fax) mike.quick@alaska.gov CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mike Quick at 907-793-1231 or mike.quick@alaska.gov. From: Worthington, Aras 1 [mailto:Aras.Worthington@bp.com] Sent:Thursday, November 10, 2016 1:41 PM To:Quick, Michael J (DOA)<michael.quick@alaska.gov> Subject: FW: MITOAs Mike, As per phone discussion we are requesting that we forego the MITOA on these three approved job Sundrys. The complete 403 approved packages are attached to this e-mail for reference. Our rationale is as follows: 1. The MITOA typically will not pass conventional pressure test criteria (30 minute test with 10%pressure loss) due to the extremely small volume we are trying to test in a fully cemented OA. The 30 minute test criteria was designed for a large volume (un-cemented,fluid packed tubing or casing and associated annuli). 2. Due to point#1, BP does not consider a passing"MITOA" to be the appropriate measure of success or failure of the repair. 3. BP proposes that the indicator for job success will be bringing the well online under evaluation and monitoring the conductor for any leak,weep, etc. as well as monitoring any thermal pressure buildup in the small void space in the OA daily. 4. In the future, BP will submit Sundries for these types of repair without an MITOA included for the above reasons. 1 . • If you agree, could you please respond to this e-mail with "approved" or"agreed"? Thank you for your time, Aras Worthington Well Interventions & Integrity Engineer BP Alaska Inc. Office: (907) 564-4102 Cell: (907)440-7692 2 ti • yor Tg �s THE STATE Alaska Oil and Gas oLASI�;A Conservation Commission (ALASKA 5 } `= 333 West Seventh Avenue :7 h„ GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Aras Worthington Interventions and Integrity Engineer ��ED SEP 3 0 016 BP Exploration(Alaska), Inc. SCA P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Pt. McIntyre Oil Pool, PTM P2-60 Permit to Drill Number: 191-091 Sundry Number: 316-436 Dear Mr. Worthington: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this / day of September, 2016. RBDMS ' SEN - 1 2016 STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMADON APPLICATION FOR SUNDRY APPROVALS 20 MC 25.280 I1. Type of Request: Abandon 0 Plug Perforations o Fracture Stimulate 0 Repair Well H Operations shutdown 0 I Suspend 0 Perforate ❑ Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other OA Cement Down Squ H 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number 191-091 3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development Q• 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22192-00-00 • 7. If perforating: What Regulation or Conservation Order governs well spacing in this pool? N/� 8. Well Name and Number: Will planned perforations require a spacing exception? Yes 0 No H - PTM P2-60 , 'RECEIVED IVED 9. Property Designation(Lease Number): 10. Field/Pools: A q ADL 0365548 • PRUDHOE BAY,PT MCINTYRE OIL' AUG 2 4 2016 11. PRESENT WELL CONDITION SUMMARY & `3 Lr/6 Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): lk. 13250 9412 12460 8680 12460 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"Conductor 30-110 30-110 Surface 3120 13-3/8"68#L-80 28-3148 28-2788 5020 2260 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner 810 7"26#NT8OS 12418-13228 8643-9392 7240 5410 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment 1 See Attachment 4-1/2"12.6#L-80 L-80 25-12473 Packers and SSSV Type: 4-1/2"TIW HBBP Packer Packers and SSSV MD(ft)and TVD(ft): 1238 8608.11 ark 7 No SSSV installed No SSSV Installed 12.Attachments: Proposal Summary 0 Wellbore Schematic Q 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development H • Service 0 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: Oil Q• WINJ 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Worthington,Aras J be deviated from without prior written approval. Email Aras.Worthington@bp.com Printed Name Worthington,Aras J Title Interventions&Integrity Engineer / Signature +�. Phone +1 907 564 4102 Date tf,/ 3/.,'-� /.4` COMMISSION USE ONLY f 4` r�'"�' Conditions of approval:Notify Commission so that a representative may witness Sundry Numb bern: �, / PlugIntegrity '3 l `-� -� ` 9 ty 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0 Other: 81i)k Post Initial Injection MIT Req'd? Yes 0 No 11 Spacing Exception Required? Yes 0 No Subsequent Form Required: /(i — 4.,''/ jl Approved by: P4,....1,44___ COMMISSIONER COMMISSION Date: /4 /rl f3/3///h t jan/s APPROVED BYTHE 9 ORIGINAL RBDMS L`-SEP - 1 2016 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • • a) a O O o D a o • CDCOCOCO — O C N V ct tf) f- V N 0 0 0 0 0 0 O CO CO CO N m CO CD CO N- CO O O CA CD V' N N CO r- CO M O O) I. O CA co co N co co co CA co I- O) CO co O co co NI- co N N N CO CO CO C COOco Lo CD CO 00 M N N- E CO co In M O N N C0 N N- O < Ln O CO O CO I,- M • � co N N Cfl N N N CC O • a 0 CO 00 CO C) 5 - ~ J 00 � Z N O _ NUQO � d - N N MLO CA O) 4 a co O N O O = co `- O Cn O J M O co W W Q Q Q N (� C> W W W U O Z 0cnZZZ � H • • a) to ca L v Ln a N � C) a) In a) 0 0 0 0 0 CD rn rn a O s— Ln co s (NI O) Ni- t' to N Ocr) co 0 C) co O > 0 ooCC) 0 cc 0 O 0 CU h a 0 5 5Q 0 0 0 Y Y OCV Cy, O O 0 ~ w co�+ O111 N CO C- J J J ¢ Q (n W 4.1 COCV CV CO N 0 0 0 _J W CL w O Z O Z Z Z O 0 -J O d ns QQ< Z 0 0 O Imo— 0 0 0 0 W Z O Z LL1 111 CU t) 0 2 2 2 O () ci) Ua) t) c RI tO ++ I — N a aa2 C r O N CO 0 � mIn i� aoco ++ 0 N N N H CL L a) ` 0 CO v) m v) CO 0 a 0 C.) a .2 (n Cl) Cl) co o_ Q_ 0_ t co no cca O a) m a a) j io CO CO CO 0 r- c- 0 `7 O c O O O W _j Z O N N N Z 1 1 < JJ W m 6) W CV 0w 'JJ 011 J '4 O N W N N N Z O' :7 W 9 LLI W W O _ M M M Q 0 _O _Thj J JDJ D 0 CO C] 1' 0 1' W —13 ,7 0 W W < < m a. 00 U) LL LL :n LL U) o_ Cr a) E 10 i I � a. o_ d < < m co u_ � � a. (r . • 4"- 4-4 4 Well: P2-60 P2-60 OA Cement Downsqueeze Well Interventions Engineer: Aras Worthington (907) 440-7692 Pad Engineer: Kaity Burton (907) 564-5554 Expected Start Date: September 10th 2016 History P2-60 is a highly prolific producer in Point McIntyre which sees great MI response from offset injectors P2-28 and P2-29. This well has had historically good on-time but was SI January 2016 due to failing MIT-OA with fluid to surface as well as suspected communication to offset wells conductors P2-58 and P2-59. P2-60 was pressure tested on the OA 01/31/2016 with monitors on the offset producers. A fluid volume to fill the OA was pumped and pressure started dropping, at this point the pumping was halted and a LLR was obtained of 0.8bpm @ 525psi. P2-58 observed not only LEL alarms but had rapid bubbling in the cellar while P2-59 had only LEL detection. Since P2-60 has been SI, both offset producers P2-58 and P2-59 have been online with no signs of bubbling or LELs. P2-60 historically has had issues with ann-comm predominantly through the wellhead. An OA downsqueeze with, _ . q e was pumped 08/24/1998 wiarcTic set cement with a subsequent MITOA failing with LLR 6.8gpm. Another MITOA was attempted later that year with LLR 12.8gpm @ 980psi. No bubbling to surface was observed and the failing MITOA was resolved with sealtite in the wellhead so the failing MITOA was not further pursued. An MITT to 2600 psi passed in March of 2016 and an MITIA to -2900 psi passed in February of 2016 so the well has two competent internal barriers. Current Status The well is currently classified as "Non Operable" by BP due to suspected IA x OA communication (only when on gas lift) as well as the suspect OA x Conductor leok. The well is currently shut-in. Job Economics Over the next 10 years, there are 124mbo estimated to be recovered as a result of getting this well back on production. Current economics do not support a rig-workover, therefore this alternative integrity repair is proposed to regain operability of the well. Objective The objective of this job is to cement the OA (13-3/8" x 9-5/8" annulus) to seal-off the suspected IA x OA leak and the possible OA x surface leak. Also, to plastic pack the IC packoffs to seal off the. suspected packoff leak from the IA to the OA. Cement will be pumped down the OA and into formation. The intent is to have cement in the OA from the Surface Casing Shoe to Surface. Post-Job Evaluation MITOA to 1200 psi Long-Term Integrity Monitoring • ➢ Daily pressure-monitoring of WHPs ➢ Periodic inspection of the Conductor/Cellar to ensure no wellbore fluid leaks 2 • • TREE= FPAC SAFETY NOTES:WELL REQUIRES A SSSV —1 WELLI-END- RC P2-60 Current rACTLA TOR.=.; BAKER C ICK13.ELEV- 30.1t o'r , KW--= 1128 ....., Msx itriale= 56‘4640(1 4,_ -1_a* 213T -4-12"OT1S HXO SVLN.D..3.812', 1 Caton.M3= 12603 0i'-`,2 1ARSSSV RAN 622_100 I Datum TVD= 8800'S.5., ,"----1 tes 1c 44A ./ 61-0,,,,I,1-1 13-3/8'OSG,SW L-80,V=12415' 1-1. 3148' _A it( (..KS LFT VANDRELS sr'. 14) ' 1v0 OEV 1FY FE 1/1.1/ LATCH ROW DATE 1 ' 3510 3008 53 0118 MY 12 0 02110/16 2 1 8123 5713 54 ORS DAY 12 0 02/10/16 Minimum ID = 3.726"@12460 3 110523 7185 50 CMS OW 72 0 02/10/10 1PARKER SINN NIPPLE L 4 I 1169E1 8026 35 OM ( W 12 0 105105/00 5 '12161 8416 29 OT1S [MV 12 0 08/12/91 6 12348 8580 27 O1 [MV 12 0 08/12/91 II ----- I 12378' -14-Itr PAWER SWS PP, 12387' ---4 5-nr X 4-112"TM'HB-BP PKR 1)-4 0" 110P OF 7'LNR---L__12420' --, I i1243 ' .hi 4-1/?PA 9 P4,t)=.. 8 I--14-1)7 PARKER Sws 483,8) 3 13'j 4-112 PARKER 984•4141P,ID=3.725' 12460'1-14-V?PXPIFLUG iO3/271/16) [4 115 11543 I'4I'4IP 00,L-00, 0160 by/,ID,,,3.150. I I 12471' - 12471' 1 14-12"7U13040 TAIL,Nst.E3 12460. Ham u LOGGED 02/24101 10-ser csG.47.,L-80.D=&ear H 12737' HA k PERFORATION SUMMARY REP LOG:C4../SFLIGR ON 08/0511 1 FT A Ncit Al i VP FIN.:i11-133 1Z/W Ptsie F*fer to Ftocludion 06 for hislorictel pert data ' g22E j SIT INTEWAL Oprk/Scp O&M 3-143'i 6 12750- 12E20 0 11/14/90 I 3-319" 6 12842 12962 0 11/14193 I 3-308" 6 12683- 12313 0 07i09/02 I I FISP{BAIT SUB CATO. car 02/00/16 -113102'Cifili Ake OAL=31*w14-1/2"G R584 NECK-SEPAELL FOLLER FOR FULLIJ84345ONS(02/23/16) ipusHED o99(03•21/16) I Pero 1,---{ 1314" ,1111/11-iti 44.4.4. ............... 1'LM.29# L-81) 0 0371 bp,0-6 184" 1--1 13230' I 04,TE REV BY COPAN:WS DATE RW By I °DEMENTS urowriCP4TY RE UNIT 08/12/9i OMG COMF1.-1AAS PM-13 02/24/18 SWC2.111D1G1 V 00(02/10/16) V.13.1 P2-60 11/28/00 51S-k1 IONVERTED TO CANVAS 03/24(16 ALMJIAD,FUSI-ED FISH OH103121/16) ,_ 1 F13 ,111-No0 . '1910910 0222/01 S-15411)'FlPAL 03131/16 MatIJACI SET MN MUG(0329/16) All Pb: 50-029-22192-00 09/04/01 RNIP 0014RECTEINS SEC 14,112N,R14E,520,FPI_&1023'WA_ I 0224/16 J1C01.4)SET FISH BATT SUB CATCHER(219116) I BP Exploration(Alsalta) 3 • • TREE= FMD SAFETY NOTES:WELL REQUIRES A SSSV. L' D ACTRYITOR= BAKER C P2-60 Proposed OKB ELEV= 39 11' BF.ELEV_ KOP= 112E Max Angle= 56" 6400 9 Cement in OA from 13-3/8" Shoe to Datum AD= 12633' r . Datum ND= 8800'SS 0 Surface 13-318"CSG,68*,L-80,D=12.415' 1--it 314W 1-4 1- _A GAS LFT MANDRELSr ST MD I ND I DEV TYPE VLV I LATCFIl PORT' DATE ' 1 3510 130081 53 OTs I DOME i 12 1 16 [12/15/15 2 8123 15713 54 OT1S DOAE j 12 1 20 12/15/15 3 1052317185 50 OTIS SO T2 1 28 12/15/151 LI 411698I,8026 35 OTIS DAH 12 I 0 05/05001 5 8416 29 OTIS DAH i 12 : 0 08/12/91 Minimum ID = 3.726"@ 12460' I i 6 ,1234818580 27 1 OTs, DAH T2 1 0 108/12/911 PARKER SWN NIPPLE 1 I I 12378' H 4-112"PARKER SWS NP,D=3,813' _1 Z —L1238TH 9-5/8"X 4-1/7 TM/i-1/3-BP PKR D=4A" 1 TOP OF 7'LNR 12420' 4.- i 1 I 12439' H 4-1/2"PARKER SWS NP,D=3.813' 1 I I 12460' —I 4-ti2'PARKER SWN NP,D=3.725' 4-1/2'TBG-PC,12.6*,L-80, 0152 bpf,D=3.958' h 12471' . - d 12471' 1H 4-112'TL1BPG TAIL,AtEG I { 12460' H fl.MD TT LOGGED 0224101 1 9-5/8'CSG,47#,L-8o D=8.681" H 1273T I—, h. PERFORATION SUMMARY REF LOG DUSFUGR ON 08,05/91 ANGLE A T TOP'PERF:21`r: 1275(7 Note:Refer to Production DB for historical perf data SEE SFE INTERVAL ' OpnISgz DATE 3-3/8' 6 12750-12820 0 11/14/93 3-3/8' 6 12842-12862 0 11/14/93 3-3/8" 6 12893-12913 I O 07/09/02 I II PBTD H 13149' - . . . 7"LNR,29#.L-80,0.0371 bpf,0=6.184" � 13230' ♦�1��•����1 A DATE REV BY COMMENTS DATE REV BY COMENTS PONT KINTYRE(.NT 08/12/91 ORIG COWL-WAS PM413 09/01/10 SV GLV CIO(07/16/01) '% L; 172-60 111/28/00 SIS-Isl COM/I:HI ED TO CAMAS 09/29/10 MN/PJC WB_LI-AD CORRECTION ON F AT No: '1910910 02/22/01 S1S-MD FNAL 02/18/11 A61JMD ADDED SSSV SAFETY NOTE API No: 50-029-22192-00 09/04/01 121`4TP CORFECTIONS 07/31/15 STF/JMD GLV C/O(07/04/15) SEC 14,T12N,R14E,520'FM_8 1023'F1Nt 07/09/02 CAO/1h ADD FETES 12/22/15 RCT/JK) GLV C/O(12/15/15) BP Exploration(Alaska) 4 TREE= FMC FETY NOTES:WELL REQUIRES A SSSV. WELLHEAD= FMc P2-60 Proposed P&A ACTUATOR= BAKER C OB.E3.EV= 39..11' BF.AFV= f:.., . ;::' NIX Angle -ssa n s4ioo Cement plug#3 circulated down h Datum ND= 12633' tubing, through tubing punches nDatum TVD= 8800'SS 11 -1 500' MD and upLFT IAMAto surface 13-318"CSG,68#,L-80,ID=12.415" H 3148' NORB S 1ST". MD `ND DEV TYPE VLV l LATCH!PORT' DATE 1 1 1 1 3510 3008 53 OTIS WW1 12 1 16 ,12/15/151 7;:: :::,,,,,..•.7"10.1 Cement plug#2 circulated down ;1sr15 $'%' 15/15 �, tubing, through tubing punches '05/00 .. above packer, and up IA IMANI " �1 s Minimum ID = 3/26 @ 12460' , .�: (12/91 I PARKER SWN NIPPLE F14-.0.9.A4 9.A :IOW.e;: 12378' — 4-1/2"PARKB2 SWS NP,ID=3.813" r Ce i['i iis[al 123$7'..,!,;,!,!;....i,:!,1,!,1..,:l.!:!..!;11___ ? 9 518 X d-1/2"TIW M 3 BP R(R D=4.0" TOP OF 7"LNR 12420' 1ement plug#1 pumped FB or laid :.::::;■iwn. mw/CT F-, 12460' --1 4-1/2"PARKER SWM NIP,D=3,725" j 4-112"TBG-FC,12.6#,L-80, 0152 bpf,D=3.958" 4 12471' " 12471" --$ 4-112"'R P G TAIL,%MEG 1 1 1246(Y H t3.M0 Yr LOGGED 02124/01 9-518'CSG,47#,L-80,D=8.681" --I 1273T Pt32FORATION SUMMARY RE LOG:DE/SR/Gil ON 08105/91 ANGLE Al TOPFERF:21"a 1275Cr 1;1111.1111!1•111111111:,:i. Mote:Refer to Production CB for historical perf data SIZE SPF INTERVAL OpnfSgz DATE f3-3/8' 6 12750-12820 0 11/14/93 3-3/8" 6 12842-12862 0 11/14/93 1 3-3/8' 6 12893-12913 0 07/09/02 ff1 I 1.!1•111111111:: I PBTD 13149' a s w+`tf rvr 7"LNit,29#,L-80,0.0371 bpf,D=8.184" H 13230' X70:11*:0:4 DATE 1 REV BY COMMENTS DATE REV BY 1 COMMENTS POM MC NTY RE MT 08/12/91 i ORIG COM'L-WAS PM-13 09/01/10 SV GLV CIO(07116/01) WELL P2-60 11/28/00 SIS-Isl CONVERTED TO CANVAS 09/29/10 NW/PJC Wt3.LI EAD CORRECTION FERMI No: '1910910 02122/01 SIS-M) FINAL 02/18/11 Mi/JM) ADDED SSSV SAFETY NOTE AR Mo' 50-029-22192-00 09/04/01 RAYTP CORRECTIONS 07/31/15 STF/JND GLV C/O(07/04/15) SEC 14,T12N,R14E,520'FM-8 1023'FW._ — 07/09/02 t CAO/tt, ADD PERFS 12/22/15 RCT/JM} GLV CIO(12/15/15) 8P Exploration(Alaska) 5 •Cement Calculations • • OA fillup volume of Cement 188 Bbls Total cement to pump 220 Bbls Key Parameters Ppg: 15.8 ppg Class G — Mix on the fly Slurry Temperature: between 80° and 110°F API fluid loss: 40 - 200 cc Thickening Time: Minimum 4 hours Compressive Strength: 2000 psi in 24—48 hours Cement thickening time: Mix on the fly Activity Time(hours) Shearing time,quality control, PJSM 0 Cement displacement 2 Cement contamination 0 Safety 2 Minimum required thickening time: 4 Cement Ramp for Blend Time Temp Pressure 0:00 90 0 1:00 65 0 2:00 65 0 5:30 52 0 10:00 46 0 16:30 42 0 24:00 39 0 Volumes: top volume MD bot MD Size ID bbls/ft. Ft. bbls 13-3/8" 12.415" 68#x 9- x 13-3/8"x 9-5/8"annulus 0 3148' 5/8" 47# 9.625" 0.0597 3148' 188 9-5/8"47# 3150' (to 13- x 4-1/2" 8.681" 9-5/8"x 4-1/2""annulus 0 3/8" shoe) 12.6# x 4.5" 0.0535 3150' 168 6 • 411/ • • I FuliborefSpecial Projects 1. Have vac trucks rigged up on location to vac fluids from conductor/cellar during the job from all three of the following wells: P2-60, P2-58, & P@-59. Note: No personnel should enter the wellhouse during the injectivity test due to the suspected leak from the conductor. Note: While pressuring up the OA of P2-60 on 2/10/16 w/AL, bubbling in the cellar was observed from P2-58. 2. RU LRS to OA. 3. Using diesel, fill up OA and pressure up the OA until it starts taking fluid and the shoe is broken down. Max OA pressure is 3000 psi. Record the injectivity rate and pressure after the shoe breaks down. Target 3-5 bpm if attainable. Vac out the conductor continuously during the pumping job to ensure all fluids remain in containment. Note: Injectivity into the OA was established @ 2.5 bpm/2000 psi 9/15/1998. Sticktine ,z. 1. Pull DGLV from Station #1 @ 3510' MD and run Circulation Sleeve @ same. 7 • FUCibore Cement • • 1. Have vac trucks rigged up on location to vac fluids from conductor/cellar during the job from all three of the following wells: P2-60, P2-58, & P2-59 . Note: No personnel should enter the wellhouse due to the known leak from the conductor during pumping. 2. RU LRS to the IA. Pump 170 bbls of hot (180F) crude down the IA through to heat the wellbore prior to the cement squeeze. Max pressure 2500 psi. 3. RU Cementers to the OA. RU in such a way that the OA can be closed in and wash up water diverted upstream of the OA. Mix cement on the fly. Pump the following schedule at maximum rate below 2500 psi treating pressure. ➢ 10 bbls neat MEOH ➢ 100 bbls hot (180 deg) freshwater + surfactant; 2 gal/bbl Surfactant and 2 gal/bbl Mutual Solvent ➢ 10 bbls of 13.5 ppg Spacer ➢ 10 bbls of neat cement ➢ 50 bbls of cement with 15-ppb aggregate/pressure-seal ➢ 160 bbls of neat cement No displacement behind cement. Slow rate to -1 bpm as aggregate gets to the casing shoe. (OA volume is -188 bbls, aggregate will be at the shoe @ 198 bbls total cement away/22 bbls left to pump). Swap to take returns from upstream of the OA while still on cement (S/D pumping as needed), and as the last couple of barrels are pumped (3-5 bbls left to pump). Ensure that returns are swapped to taking cement returns to surface before the last of the cement is pumped downhole to ensure nothing but cement goes down the OA. SI the OA and flush lines through a different route than down the OA. Note that the OA may be on a vacuum and may suck any wash up water that is pumped across the OA down into the OA if allowed to do so and would likely freeze and crush the casing and/or tubing (thus swapping and SI OA before wash up water). * Note: Good success on OA downsqueezes has been realized by the hesitation squeeze method; i.e. shutting down pump entirely as the last -10 bbls of cement are pumped, watching to see if pressure is maintained or drops right off, then pumping a couple more barrels until catching fluid and repeating this to give the aggregate every opportunity to bridge off either in the OA or at the shoe. See WSRs from X-34 & Y-39 for reference. 4. After washing up surface lines, hold open bleed on OA for 1 hour, sniff for LEL's, then ND gate valve and manually clean any residual cement from the valve and VR profile. (See MOC#10083 for specific deviation details allowing for this operation). 5. Grease the OA gate valve to clear of all cement & NU valve. 1. Wait on Cement -3 days. 2. Shoot fluid level on OA to locate TOC. 3. If fluid level is "near surface" then strap TOC to verify actual depth. 8 • Special Projects/Valve Shop .. rr 1. ND OA Gate Valve, strap TOC. 2. NU OA Integral. 3. Bleed Annuli, Prep OA, Squeezecrete OA top job to 2500 psi per RP: "Small volume cement squeeze". DHD 1. WOC for 7 days. MITOA to 1200 psi. Slickline y �� r�,: � r 1� � r ! '` psi 1xf-ffr 4,,;lllr''%.,"'r'1�/lr�f,+i i l ?2,;7."J:.ku'�'.,l"., 1. Run Generic GLV design. Weti integrity Coordinator 1. POP under evaluation and monitor conductor and cellar for any fluid leakage. 9 UNSCANNED, OVERSIZED MATERIALS AVAILABLE: �9f FILE # Y we To request any /all of the above information, please contact: Alaska Oil & Gas Conservation Commission i333 W. 7th Ave., Ste. 100 Anchorage, Alaska 99501 Voice (907) 279 -1433 Tax (907) 276 -7542 • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 Mr. Jim Regg Alaska Oil and Gas Conservation Commission �AC �� 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA PM -2 . Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, G( Mehreen Vazir BPXA, Well integrity Coordinator • • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM-2 Date: 04/30/2012 Corrosion Vol. of cement Anal top of Cement top Corrosion inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2 -03 1970440 50029227490000 2.0 NA 2.0 NA 10.20 6/22/2009 P2-04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2 -06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2 -07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2 -08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2-09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 1020 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 10.20 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2-31 1940360 50029224560000 2.2 NA 2.2 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -33B 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2 -35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P240 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P241 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P242 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P2 -43 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P2-44 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P2-46 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P247 1951900 50029226280000 0.0 NA 0.0 NA NA NA P248 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P249 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2 -59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA --- P2-60 1910910 50029221920000_ 8.3 NA 8.3 NA 56.10 3/13/2012 Page 1 Regg, James B (DOA) / From: Regg, James B (DOA) ell? Sent: Tuesday, November 16, 2010 3:09 PM l To: 'AK, D &C Well Integrity Coordinator' Subject: RE: PBU P2 -60 (PTD 1910910) Thank you for the information; Inspector's report has been adjusted to reflect IA pressure for P2 -60 is 2120psi. Jim Regg AOGCC h� �y q fl 333 W.7th Avenue, Suite 100 y��D NI GiV 1 8 2 0 t0 Anchorage, AK 99501 907 - 793 -1236 From: AK, D &C Well Integrity Coordinator [ mailto: AKDCWellIntegrityCoordinator @bp.com] Sent: Tuesday, November 16, 2010 6:08 AM To: Regg, James B (DOA) Cc: AK, D &C Well Integrity Coordinator Subject: FW: PBU P2 -60 (PTD 1910910) Jim, Enclosed is a picture taken last night on P2 -60 that shows both gauges. The gauge in the fore round is attached to the IC hangar void and the gauge in the back ground is the IA pressure. If we can be of further assistance, please let us know. Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 From: AK, D &C Well Integrity Coordinator Sent: Monday, November 15, 2010 4:38 PM To: 'Regg, James B (DOA)' Cc: AK, D &C Well Integrity Coordinator Subject: RE: PBU P2 -60 (PTD 1910910) Jim, Attached is the requested plot for P2 -60 (PTD # 1 10910). 1 am at a loss for the pressures that are being quoted for the IA pressure. I believe what was served may have been a gauge on the IC hangar void, as a Seal -Tite treatment had just been perfor ed on the IC- hangar seal. With the Seal -Tite treatment having bee pumped on 9/28/2010, DHD had been monitoring the wellhead pressures, so I have a second verifica i n of the pressures, besides the well operators reads. I am enclosing the details of the reads. 10/5/2010: TWO = 500/0/0 +. T p = 70 *. Monitor well during POP, Post IC PO Tur -Flo treatment. No build up on OA observed whi well BOIL. IC Packoff void holding at 3000 psi. See log for details. Job complete. Final T /I /O = 75 250/0 +. 10/8/2010: T /1 /0= 570/2120/140. Temp= 130* WHPs (Post seal - tite). AL online. TP decreased 180 psi, IAP decreased 130 psi, OAP increased 140 psi since 10/5/10. 11/16/2010 • • Page 1 of 2 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWelllntegrityCoordinator @bp.com] Sent: Tuesday, November 16, 2010 6:08 AM To: Regg, James B (DOA) f Cc: AK, D &C Well Integrity Coordinator Subject: FW: PBU P2 -60 (PTD 1910910) Attachments: PM2 -60 IA and IC HAngar Void Gauges 11- 15- 2010.jpg I +_ I Jim, Enclosed is a p icture taken last night on P2 -60 that shows both gauges. The gauge in the fore ground is _ attached to the IC hangar void and the gauge in the back ground is the IA pressure. If we can be of further assistance, please let us know. Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 From: AK, D &C Well Integrity Coordinator Sent: Monday, November 15, 2010 4:38 PM To: 'Regg, James B (DOA)' Cc: AK, D &C Well Integrity Coordinator Subject: RE: PBU P2 -60 (PTD 1910910) Jim, i Attached is the requested plot for P2 -60 (PTD # 1910910). 1 am at a loss for the pressures that are being quoted for the IA pressure. I believe what was observed may have been a gauge on the IC hangar void, as a Seal -Tite treatment had just been performed on the IC- hangar seal. With the Se -Tite treatme having been pumped on 9/28/2010, DHD had been monitoring the wellhead pressures, so I have a second verification of the pressures, besides the well operators reads. I am enclosing the details of the reads. 10/5/2010: T /I /O = 500/0/0 +. Temp = 70 *. Monitor well during POP, Post IC PO Tur -Flo treatment. No build up on OA observed while well BOL. IC_ Packoff void holding at 3000 ps i. See log for details. Job complete. Final TWO = 750/225010 +. 10/8/2010: T /1 /0= 570/2120/140. Temp= 130* WHPs (Post seal - tite). AL online. TP decreased 180 psi, IAP decreased 130 psi, OAP increased 140 psi since 10/5/10. SV =C; MV, SSV, & WV =O; IA & OA= OTG. NOVP. 10/11/2010: T /I /0= 660/2120/150. Temp= 132 °. WHPs (post seal- tite). AL online. TP increased 90 psi, IAP unchanged, & OAP i crn eased 10 psi since 10/8/10. SV =C. WV, SSV & MV =O. IA & OA =OTG. NOVP. Please note that these reads reflect the TIO plot that was enclosed. Also, not that the IC void pressu was montiored at 3000 psi on 10/05/201 and the w ell increased in temperature which would ha incre the IC void hangar press If the inspectors on the slope would like to discuss this further, we would be happy to show them that the gauge they observed was not reading IA pressure. Please call if you would like to discuss or have further questions. I am heading to Anchorage this evening and Torin will arrive Tuesday evening on the slope. 11/16/2010 • • Page 2 of 2 Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 From: Regg, James B (DOA) [mailto:jim.regg @alaska.gov] Sent: Monday, November 15, 2010 9:30 AM To: AK, D &C Well Integrity Coordinator Subject: PBU P2 -60 (PTD 1910910) Please send 90day TIO plot for PBU P2 -60 (PTD 1910910). Commission Inspector witnessed SVS tests on P2 pad on October 9, 2010 and recorded IA pressure as 3490psi. Based on casing info in our files, it appears the IA pressure (if correct) exceeds 45% of the published casing min. internal yield pressure (9 -5/8 ", L80, 47ppf; MIYP= 6870psi; IA pressure would be 50.8 %); this should have triggered notice and corrective action (Conservation Order 503, Rule 5). Jim Regg AOGCC 333 W.7th Avenue Suite 100 Anchorage, AK 99501 907 - 793 -1236 11/16/2010 Page ~/- Regg, James B (DOA) From: Grinna|di, Louis R(DOA) Sent: Monday, November 15.201O7:42PyN To: Rmog. James B(DOA) Subject: RE: PBU P2-60 (PTD 1910910 | most likely observed 2490 and wrote 3490. | think this was during the time that | was trying to get from ~ the manifold building out to the wellhouses and back to observe all portions of test. I will run out there and look this hitch. Lou From: Regg, James B(DOA) Sent: Monday, November 15, 2010 4:47 PM To: Grimaldi, Louis R(OOA) Subject: FVV: PBUPZ-6D(PTD 1910910) Jinn Re g AOGCC � mmW.7thAvenue, Suite 100 AK 99501 � � � Fr om : -_- We I n t egr ity ` Coo _.' __ —_'- -—__--_'^ Sent: Monday, November 15, 2010 4:38 PM Cc: AK, D&C Well Integrity Coordinator Subject: RE: PBU 132-60 (PTD 1910910) Attached is the requested plot for P2-60 (PTD # 1910910). 1 a at a lo r the pressures that are being quoted for the IA pressure. I believe what was observed may have b gauge on the IC hangar void, as a Seal-Tite treatment had just been performed on the IC-hanga ea. With the Seal-Tite treatment having been pumped on 9/28/20 , DHD had been monitoring the wellhead pressures, so I have a second verification of the pressures esides the well operators reads. I am enclosing the details of the reads. 10/5/2010: T/l/O = 500/0/0+. Temp = 70*. Monitor 11 during POP, Post IC PO Tur-Flo treatment. No build up on OA observed while well BOL. IC Pac ff void holding at 3000 psi. See log for details. Job complete. Final TWO 750/2250/0+. in be ee me t' e C -h r' ana DHI v a n /h e e e IAP decreased 130 psi, OAP increased 40 psi since 10/5/10. 10/1 1/201 0: T/1/0= 660 12 15 . Temp= 132'. WHPs (post seal-tite). AL online. TP increased 90 psi, Please note that /theseads reflect the TIO plot that was enclosed. Also, note that the IC void pressure was montiored at 3 0 psi on 10/05/2010 and the well increased in temperature, which would have increased the IC id hangar pressure. ]l/lh/70lU PBU P2 -60 PTD 1910910 11/16/2010 Attachment Refer to email 11/16/2010 from BPXA Well Integrity Engineer (Gerald Murphy) regarding questions about high inner annulus (IA) pressure observed during SVS testing 10/9/2010 IA pressure gauge r-- • IC hanger void / pressure gauge E PBU P2 -60 PTD #1910910 11/15/2010 TIO Pressures Plot Well: P2 -60 4,000 Oi io — Tbg �— OA 2.000 OOA OOOA { On 1,000 00:'2=:'10 09/111 09/25/10 10/09/10 10 /CM0 11/06)10 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A'I-I'N: Beth 09/30/03 NO. 2981 Company: State of Alaska Alaska Oil & Gas Cons Corem Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job # Log Description Date Blueline Prints CD D.S. 5-16B ~ (:~ q ,-[ ~ LDL 09110/03 P2-60. ~ q [ --(""~t '\ PROD PROFILE W/DEFT 09113/03 H-26 ,' ,~'j;:~ -~ -~----~- PROD PROFILE 09/17/03 E-21A~( ~l~j[ ~ } C-~<:~ SBHP SURVEY 09/16103 NK-29 ~' C~'( ~ '- i c~- ~:) PROD PROFILE W/DEFT 09109103 D.S. 3-29 '~/:~1_" (:~'~ PROD PROFILE W/DEFT 09/19/03 D.S. 15-18 ~ ~-'I'~Y-J '(:::)('O~ SBHP SURVEY 09/19/03 U-08A I ~'~- ~~ SBHP SURVEY 09/20/03 W-24., [ ~<:~ ~~ ) / LDL 09/23/03 D.S. 9-06 ~ "~/~-(~)L~_,~_ PROD PROFILE W/DEFT 09/20/03 D.S. 2-08B '}<::~ ~:~ ~c~=~ 23375 CH EDIT MCNL 05/31/03 ~N-23A~... ' . -- 23373 OH EDIT LWD IMPULSE DATA -- 04130103 W-23A ~.~,~(~_'~".(")~tf/-.~ 23373 MD VISION RESISTIVITY 04130103 W-23A ~ 23373 TVD VISION RESISTIVITY 04/30103 .VV-23A ,/ 23373 MD BOREHOLE PROFILE 04/30103 MPS-02~ ~/-,,.,.~.,/C~:~ 10624537 CH EDIT SCMT GR (PDC) 08/09103 MPS-02/"'C~'''4-'/ ' ~ 23435 SCMT 08109103 MPS-18~k., ~-j~,.~ 10559235 CH EDIT SCMT GR (PDC) 03103/03 MPS-18//(:~ ~" ~t..,~ 10559235 SCMT 03103/03 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: OCT 10 Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X ADD PERFS Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 39 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service~ Point Mclntyre Unit 4. Location of well at surface 8. Well number 519' FNL, 4257' FEL, Sec. 14, T12N, R14E, UM (asp's 681272, 5998057) P2-60 At top of productive interval 9. Permit number / approval number 1951' FNL, 1998' FEL, Sec. 12, T12N, R14E, UM (asp's 688710, 6002090) 191-091 At effective depth 10. APl number 1964' FNL, 2015' FEL, Sec. 12, T12N, R15E, UM (asp's 688693, 6002077) 50-029-22192-00 At total depth 11. Field / Pool 1939' FNL, 1962' FEL, Sec. 12, T12N, R14E, UM (asp's 688746, 6002104) Point Mclntyre Oil Pool 12. Present well condition summary Total depth: measured 13250 feet Plugs (measured) TD Tagged @ 13089' (07/08/2002) true vertical 9412 feet Effective depth: measured 13089 feet Junk (measured) true vertical 9263 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 13" 5400 sx Permafrost 3148' 2788' Surface 12737' 9-5/8" 638 cf Class 'G' 12737' 8935' Production 810' 7" 319 cf Class 'G' 12420' - 13230' 8644' - 9394' Perforation depth: measured Open Perfs 12750'- 12820', 12842'- 12862', 12893'- 12913' true vertical Open Perfs 8908' - 8973', 8993' - 9012', 9080' - 9099' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 TBG @ 12471'. Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" TIW HB-BP Packer @ 12387'. 4-1/2" Otis HXO SVLN @ 2137'. .-~,!a ..... ;~ fjii 4, .:,,.. ,~¢,.: ..... ; .......... 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 07/05/2002 863 627 4332 988 Subsequent to operation 07/11/2002 1209 259 5473 954 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is ~ue and correct to the best of my knowledge. ~1~~_ _ ¢*'~"'~"~'¢~2~ ~~~¢"~~ Title: Technical Assistant Date July 15, 2002 S norr SCANNED ,l [)l .!. DeWar/ne R. Schnor, 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 07/08/2002 07/09/2002 07/12/2002 O7/08/02 P2-60 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS PERFORATING: DRIFT/TAG PERFORATING: PERFORATING PERFORATING: SSSV C/O OR STROKE EVENT SUMMARY PULLED SSSV (LEFT OOH ) DRIFTED TO 13079' SLM, (13089' CORRECTED) WITH 3.375" DUMMY GUN. <<< TURNED WELL OVER TO DSO >>> 07/O9/02 PERF--RIH W/20' OF 3-3/8" HSD- PJ- HMX 6-SPF, PULLED UP TO STOP DEPTH (12889') TO PERFORATE 12893' - 12913' (CCL TO TOPSHOT = 4'). FI RED GUN WITH WELL FLOWING AT 1600 PSI (2500 PSI SIP), 40 % CHOKE. NOTED LARGE TENSION BOUNCE (300 LB) WHEN FIRED. SI WELL TO RIH & POOH. DID NOT TAG TD. NOTIFY PAD OP OF WELL STATUS: <<< BRING WELL ON 07/12/O2 SET 4 1/2" QOS CONTROL OPERATED / BAL & CHEMICAL PLUGGED --- SERAIL# LQOS-404 .... CLOSURE TEST 1550# TO 1250# ( GOOD )--- RDMO--- <<< GAVE WELL TO DSO TO PUT ON PRODUCTION >>> FLUIDS PUMPED BBLS 3 DIESEL FOR PRESSURE TESTING SURFACE PRESSURE CONTROL EQUIP 3 TOTAL 07/09/2002 ADD PERFS THE FOLLOWING INTERVAL WAS PERFORATED USING THE 3-3/8" POWERJET, LOADED 6 SPF, 60 DEGREES PHASING, RANDOM ORIENTATION. 12893' - 12913' Page I TREE = FMC WELL H EA D = CIW ACTUATOR = BAKER C KB. REV = 43.3' BF. REV= KOP = 1126' Max Angle -- 56 @ 6400' Datum IVD = 12633' Datum TV D = 8800' SS I 13-3/8" CSG, Co8#, L-80, ID= 12.415" H 3148' IMinimum ID = 3.725" @ 12460' I PARKER SWN NIPPLE I TOPOF7"LNR H 12420' 4-1/2"TBC_~IPC, 12.6#, L-80, .0152 bpf, ID= 3.958" H 12471' I 9-5/8" CSG, 47#, L-80, ID = 8.681" 12737' PERFORATION SUIVIVIARY REF LOG: DIL/SFL/GR ON 08/05/91 ANGLE AT TOP PERF: 21 @ 12750' Note: Refer to ProducUon DBfor historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 12750 - 12820 O 11/14/93 3-3/8" 6 12842 - 12862 O 11/14/93 3-3/8" 6 12893 - 12913 O 07/09/02 I 7" LNR' 29#' L'80' 0'0371 bPf' ID = 6'184" H 13230' P2-60 ~k ISA FI-FY NOTES: 2137" H 4-1/2" OTIS HXO SVLN, D =3.812", '1 WRSSSV RAN 6f22/00 GAS LIFT MANDRELS 1113~1°13°°81~3 I OT~SlIT~I I I --t 2 18~3 157131 54 I OTISl I~ I I I 1 3 110523171~1 so I OTISl I= I I I I 4 11169818o261 35 I OT~Sl I= I I I I5 112~61184161 29 lOT,SI IT~I I I I 6 112348185801 27 I OT~SI IT2I I I 12378' H 4-1/2" PARKERSWS NIP' ID =3'813" I 12387'H 9-5/8" X 4-1/2" TIW I-B-BP PKR, ID = 4.0"I 12439' H 4-1/2" PA RKER SWS NIP, ID = 3.813"I 1 2460' H 4-1/2" PA RKER SWN NIP, ID = 3.725"I 12471' H 4-1/2" TUBING TAIL, WLEG I 12460' H ELIVD'FI' LOGGED02/24/01 I DATE REV BY COMIVENTS DATE REV BY COMIVENTS 08/12/91 ORIG COIVPL-WAS PM-13 11/28/00 SlS-Isl CONVERTED TO CANVAS 02/22/01 SIS-IVD FINAL o9/o4~ol ~ coR~c~o~s 07/09/02 CAO/tlh ADD PERFS 86'Ahii SEC14 PONT MCNTYRE UNIT WELL: P2-60 PERIVIT No: 91-091 APl No: 50-029-22192-00 EL 1939.03 FhL (Alaska) Pt Mclntyre Wellname Changes 5/28/02 Pt. Mclntyre 01 i177-046 Pt. Mclntyre 02 i177-065 Pt. Mclntyre 03 P1-02 i188-005 Pt. Mclntyre 04 P1-03 1189-013 Pt. Mclntyre 05 P1-25 i189-041 Pt. Mclntyre 06 Pt. Mclntyre 07 P2-58 ,190-008 P1-01 i190-027 Pt. Mclntyre 08 P1-07 189-134 Pt. Mclntyre 09 P2-59 190-140 Pt. Mclntyre 10 P2-57 ,191-079 · i Pt. Mclntyre 11 P1-12 1191-013 Pt. Mclntyre 12 !191-037 Pt. Mclntyre 13 'P2-60 j191-091 Pt. Mclntyre 3 DP 189-003 Page 1 STATE OF ALA~;KA ALASK/~ir~":L AND GAS CONSER~/ATION COMMIS REPOR'i SUNDRY WELL,OPERATI,JNS 1. Operations performed: Operation shutdown __ Stimulate ~ Plugging_ Pull tubing __ Alter casing __ Repair well __ Perforate Other__ ~_. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 519' FNL, 4257' FEL, Sec. 14, T12N, R14E At top of production interval 3328' FSL, 3282' FWL, Sec. 12, T12N, R14E At effective depth At total depth 1939' FNL, 1960' FEL, Sec. 12, T12N, R14E 5. Type of Well: Development Exploratory Stratigraphic Service Datum elevation (DF or KB) KB 39 feet 7. Unit or Property name POINT MCINTYRE UNIT 8. Well number P2-60 9. Permit number/approval number 91-91 / 10. APl number 500292219200 11. Field/Pool Point Mclntyre 12. Present well condition summary Total Depth: measured: Effective Depth: Casing Conductor Surface 13250 feet true vertical: 9412 feet measured: 13116 feet true vertical: 9288 feet Length Size Cemented 3148' 13 5400 SX Permafrost Plugs (measured) Junk (measured) None. None. Measured depth True vertical depth 3148' 2788 Intermediate 12737' 9 5/8" 638 CU ft Class G Liner 810' 7" 319 CU ft Class G Perforation depth: measured 12750-12820', 12842-12862' true vertical 8908-8973', 8993-9012' Tubing (size, grade, and measured depth) 4 1/2 in. 12.6# L-80 @ 0-12471' MD, Packers and SSSV (type and measured depth) 4 X 8 2/3 PKR @ 12387' MD, 3 4/5 x 4 1/2 SSSV @ 2137' MD 12737' 8935 13230' 9394 JUL 22 Alaska Oil a 6a.s 6u,~_--.. Csr:~:~issi~ Anchorace 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure Please refer to attached. ORIOII ,IAL 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1423 919 3037 2092 1193 5460 I 16. Status of well classification as: Oil ~ Gas Suspended 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 17. I hereby certify that the~oregpin~l is true and correct to the best of my knowledge. Sign ed- ~' /I ~ ~-~~'; ?~__._ Title ~.;~,-~'" V~ ~¢~ Tubing Pressure 764 816 Service Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE P2-60 DESCRIPTION OF WORK COMPLETED OUTER ANNULUS CEMENT DOWNSQUEEZE Date Event Summary 08-24-1998 Performed an Outer Annulus Cement Downsqueeze. MIRU. Well pressure tested to 3500psi w/50/50 Meth, then the fluids were pumped in the following stages: a) 5 bbls Meth at 2 bpm, followed by b) 3 bbls Fresh Water at 2 bpm, followed by c) 35 bbls Arctic Set Cement w/1/4 pps Cellophane Flakes at 1.4 bpm, followed by d) 5 bbls Fresh Water pumped through mix tub for cleanup, followed by e) 140 bbls Crude at 2.5 bpm, followed by f) 13 bbls Diesel at 2.9 bpm, followed by g) Shutdown. RDMO. Well left flowing. Well- P2-60 SSSV LN -- NIP -- PKR -- NIP -- NIP -- Per[ - Per[ - GPMA WEB Date: 4/'15/99 APl: 500292219200 SSSV Type: CAT I - SSSV Annular Fluid: A/L GAS Reference DIL/SFL/GR Log: Last Tag: 13116' SLMD-CORR Last Tag Date: 9/19/97 Well Type: PROD Odg Compltn: Last W/O: Ref Log Date: 8/5/91 TD: 13230 ftKB Angle @ TS: deg @ Angle @ TD: 22 deg @ 13250 Rev Reason: RAN WR SSSV Last Update: 12/5/98 Max Hole 56 deg @ 6400 Angle: :Safe~:Nbtes: ::::: ::::: :::::: : :: : Date Note 8/12/91 Minimum ID: 3.725" PARKER SWN NIPPLE @ 12460' MD Note: Formedy PM-13 Date Note 8/12/91 Tubing Hanger: FMC BIG BORE @ 23' MD 8/12/91 Well Status: ACTIVE Other (plugs, equip., etc.) - JEWELRY Depth TVD Type Description 2137 2062 SSSV LN 4-1/2" OTIS 'HXO' SVLN, ID=3.812", WRSSSV INSTALLED 12/4/98. 12378 8607 NIP 4-1/2" PARKER SWS NIPPLE, ID=3.813" 12387 8615 PKR 9-5/8" X 4-1/2" TIW 'HB-BP' PACKER 12439 8662 NIP 4-1/2" PARKER SWS NIPPLE, ID=3.813" 12460 8680 NIP 4-1/2" PARKER SWS NIPPLE, ID=3.725" 12471 8690 TT 4-1/2" TUBING TAIL WLEG ( 12460' ELMD) Casing Strings -:AIl~ :::: :: ID 3.812 3.813 3.910 3.813 3.725 4.000 Size Weight Grade Top Btm Feet Description 13.375 68.00 L-80 0 3148 3148 SUR. CASING 9.625 47.00 L-80 0 12737 12737 PROD. CASING 7.000 29.00 L-80 12420 13230 810 LINER Tubing Strings-All : Size Weight Grade Top Btm Feet Description 4.500 12.60 L-80 0 12471 12471 TUBING-IPC Gas Lift MandrelsNalves::: : :::: ] Stn MD TVD Man Man VMfr VType VOD Latch Port TRO Date Vlv Mfr Type Run Comment 1 3510 3008 OTIS CA GLV 1.5 T2 0.250 2209 10/22/98 GLM 2 8123 5713 OTIS CA GLV 1.5 T2 0.250 2286 10/22/98 GLM 3 10523 7185 OTIS CA DV 1.5 T2 0.000 0 GLM 4 11698 8026 OTIS CA ORIFICE 1.5 RA 0.375 0 10/22/98 GLM 5 12161 8416 OTIS CA DV 1.5 T2 0.000 0 GLM 6 12348 8580 OTIS CA DV 1.5 T2 0.000 0 GLM interval TVD Zone Status Feet SPF Date Type Comment 12750 - 8947 - 9012 70 611/14/9: 12820 12842 - 9033 - 9052 20 611/14/9: 12862 rF'' BP EXPLORATION Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501 Dear Chairman Johnston, BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 October 6th, 1997 Pursuant to the Point Mclntyre Agreement Regarding Interim Funding, Final Equity Determination, and Facility Sharing dated 4/28/92, please transfer the name of Operator of the following wells from BP Exploration (Alaska) Inc. to ARCO Alaska, Inc.' Well Permit # P2-59 (Formerly Point Mclntyre #9) P2-58 (Formerly Point McIntyre #6) P2-60 (Formerly Point McIntyre #13) 90-0140 90-0008 91-0091 Yours Sincerely, /- i Robert W. Janes ~ Manager, Greater oint Mclntyre Area cc. Joe Leone (ARCo Alaska, Inc.) Jim Branch (Exxon Co. USA) 1997 guohorag Date: Subject: From: ARCO Alaska, Inc. Lisburne/Point McIntyre Engineering December 2, 1993 Transmittal #367 ARCO Alaska Inc. To: Bob Crandall AOC~C 3001 Porcupine Drive Anchorage, AK 99501 The following Point McIn~e data are enclosed. cooperation in maintaining confidentiality is appreciated. · Well Log ,-',).-/ I blueline 1 sepia I~)?_D -- l,'~?qZ,~ 5" ~ P1-01 Perforation Record 2-1/i' BH ENERJET r'.~'; P1-05 -'Static Pressure Survey fPRESS/TEMP/GR/CCL) .q~.d/Fi-08ST~tVLWD Verf 'Enhanced Resistivity CDR ~sqqr~°~'~' / ~PI~'"LWD True Vertical Depth CDR ~¢q- ~v~ % 5 crnl~ IPl-17 ~Pl-17 >~ ~~P2-16 P2-16 -IP2-46 ...7c~P2-57 ~ IP2-57 [_~P2-60 P2-60 P2-60 \! This information is confidential and your Run # Run D~te Company ~'Perforation Record 3-%8" HSD -4lB '~oO-toz.5o) s" 1 /Perforation Record ~/i~D 4lB fi~0o-.t0~o~ ~" 1 wDataFrac~g ~voo-t~zSo~ 5" 1 wCement Ev~uafion Log (CET~R) ~ement Bond Log (CBT~R) 3~o-i0q0o s,' 1 <~ent Ev~uafion'Log (CET~R) ~~t Bond Log (CBT-GR) ~tTz-fi~, 5" 1 ,Compe~ated Neuron Log (2.5" ~T-D/~ 11/14/.93 ~Perforafion Record (~/~ G~ -4lB ~tafic Press~e s~ey ~SS/~~/GR/CCL) ~erforafion Record ~/i' ~IB ~ ~5~ Izod, 5"1 11/14/93 11126193 .1129193 11/07193 0/24/93 0/24/93 0/24/93 10/24/93 1 11/3-4/93 Sd-dm~ PLEASE SIGN ONE COPY AND RETURN Transm/l-tal g367 (AC)GCC) Page 2 c~b-C~t P1-21 ~]P2-16 P2-16 c)~_t~ P2-46 P246 ! Well Tape/Diskette w/verification ot~ '~ 5qT,-'b .--\o ~v Run # R~ Date Comply ~Tgl C~Data ~ 2 ST Bit R~s (w/Orig. WeS) 1 7/18/93. Du~ PropResis/Neu/Dens/GR-DePth S~tedc* 4 Du~ PropResis/Neu/Dens/CR-Depth Shi~e~-3~zs }~/m 8/31/93 Schl~~ 9/13/93 Atlas 9/12/93 Schltanbar~ 9/27/93 Atlas 9/26/93 Schl~~ Please sign ~ ,~o~ ~c~'~ and return to. Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 Anchorage, Alaska 99510-0360 -, Transmittal #367 " '~gO -wn/~ieelon PLEASE SIGN ONE COPY AND RETURN STATE OF ALASKA Alaska Oil Gas Conservation Commission Anchorage, Alaska 99501-3192 CONFIDENTIAL DATA RELEASE The AOGCC will release confidential well data authorized DNR/DOG employees. All data is to inventoried prior to release and a copy of the inventory given to the DNR/DOG employee. to Permit. O~ !- C~ I WellName: 01) Permit to Drill (401): pages 02) Completion Report (407) '~ pages 03) Daily Drilling History: ~ pages 04) Directional Surveys:~ pages 05) Drill Stem Tests: ~ 07) Core Description: ~ 09) Formation Picks: pages 06) Core Analysis Report: ~ pages 08) Digital Data: reels pages pages 10) Bluelines ' logs (list below) LOG TYPE INTERVAL RUN # SCALE TODAY'S DATE', The under-signed ~)h-~/])cx~ employee hereby accepts receipt of the above listed confidential Name:materials' P,~,~~~ Authorized A~cc p~, sign b/M~f¢~ference of~hese confidential materials. Signature:~~ To: From: Larry Grant DNR-Oii & Gas Conservation Fax: 276-754.2 Kent RicMer DNR-Division of Oil & Gas Phone: 782-2138 Date: 06t28193 Subject: List of well clara requestecl Tor pickup un May 20, /Pt. Mclntyre 1 ~3,4,11,7', 13,9,1 ,?.,P 1 /Ali I want is ]~ the tapes if you have Lhem. If not, ~en copy the sonic, density ~t --a"d deviatio~ I~s. Than~. Please have re~cly for me to pick up: As soon au possible (of course) Hopefully sometime June 29, 'g3. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 31, 1992 Mr. Robert Crandall Alaska Oil and Gas Consen.,ation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject' RE: Point Mclntyre #13 Well Cuttings Samples BPX recently received a request from Mr. Larry Grant for a more complete well cuttings sample set for Point Mclntyre #13. Our core store sent the original, unopened set of the Epoch Well Logging, Inc. dry sample cuttings from 7,500' to 13,250' on 6/18/92. Apparently, this set does not meet the AOGCC weight criteria. We regret this error and will contact the mudlogging companies to ensure they are aware of the 3 ounce sample/bag requirements for future wells. Cuttings returns during coring operations are commonly poor and powdery. At your request, we have provided the AOGCC with additional core chip samples from the reservoir interval of this well when the original chips from Core Labs were deemed too small. In the future, we will also request that mudloggers annotate sample bags when only small or no samples are recovered. Please contact me at 564-4553 if you require further information. Thank you. Robert B. Hunter Lisburne and New Developments RECEIVED S E P - 1 19 J2 Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 14, 1992 Mr. Larry Grant Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject' Point Mclntyre ¢6 and ¢13 Well Data Transmittal CONFIDENTIAL Please acknowledge receipt of the following Pt. Mclntyre (PM) ¢6 and ¢13 core descriptions. The core analysis reports from Core Laboratories also contains detailed core descriptions (copies attached). Those reports were sent under separate covers dated 6/22/92 for PM ¢13 and dated 6/14/90 for PM ¢6. Please contact Bob Hunter at 564-4553 if you require further information. Thank you. RETURN TO: Terry Obeney BP Exploration (Alaska)Inc. P.O. Box 196612 Anchorage, AK 99519-6612 28. COREDATA ~: '~" ' '~ Briel descriplion ol lithology, porosily, Iractures, apparent dips, and presence ol oil, gas or water. Submit core chips, .. ' '. ;' !!ii{';~ '!~'i~'~'i .... ~.'.' 'i. ' Cae #1: 12,750-12,816' MD, Recovered 57' of 100% Sandstone. fine lower to medium upper grained, quadzose, glauconltic, wkh none to Irregular to banded slder#e oemenL Even to ~ brigM yelow florescence, white/yellow cut flore~cenc~ light brown oll Blain. · .,.,, · · ' ' · I '' . . . '[ . . , . . Core #2: 12,810-12,890' MD, recovered 71' of 100% Sandstone, predominantly fine to upper medium grained, quart2ose,, glau..c~n. Itle. Decrease In ?l.derk? .ce .ment rel .al .h/e to core #1 and occur~ng in (x:casional bands and nodules. Vtsble bleeding o11, even bright yellow florescence, Instantaneous white/yellow sb'eammg cut florescence, even dad< to light brown staJn. Core #3: 12,890-12,980' MD, recovered gO' of 100% Sandstone', fIne upper to medium lower grained, quartzose, glauconitlc. Visible bleedIng oll from core, brl0ht gold to dull gold Ilorescence, fast I white/blue to gold cut florescence, medium to light brown staIn. . ~ . .... ~ ' ' '..,' :, ·' '; ;, ' ¢*, i i ',:,: ;' . ~ . . ~ , , , .. . . ., ? . , · Core ~: 12,081-13,071' MD, Cut and Recovered 90' of Sandstone, moderately' triable, line lower to medium upper grained, predominantly quart2ose, whh minor gtauconite. Mostly spotty to no '. stain, dominantly pale gold tloroscence, ta~t str~ yellow/gold/blue cut Ilorescence. .~ . T.'.. '.'"'" ~' ;' : Form 'i0-407 Submit in duplicate Rev. 7-1-80 CONTI~ED ON REVERSE SIDE July 16, 1992 Mr. Larry Grant Alaska Oil End Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject: Point Mclntyre #13 Well Data Transmittal CONFIDENTIAL Please acknowledge receipt of the following Pt. Mclntyre #13 data. The PM #13 and PM #6 core descriptions will be sent upon my return from vacation after July 27, 1992. Please contact Bob Hunter (564-4553) if you require further information. Thank you. LOGGING SUMMARY Final Composite sepia copies Micro log -Gamma ~/, 8/5/91 Natural Gamma Ray Spectrometry Log 8/5/91 Dual Induction - SFL - GR, phasor proccessed--'/'8/5/91 ? Borehole Compensated Sonic Log ~ 8/5/91 Litho Density- Neutron (Porosity) Litho Density - Neutron (Raw) v Repeat Formation Test ~ 8/5/91 8/5/91 8/5/91 Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger , RECEiVED jUL I G 1992. Alaska 0il & Gas Cons. Commission Anchorage MWD Logs (One paper sepia each and one blueline each) MWD- Resistivity Gamma ~"'"'~" Measured Depth Log (2", 5") (sepia and paper) MWD - Resistivity Gamma True Vertical Depth Log (2", 5") (sepia) 8/5/91 8/5/91 Schlumberger Schlumberger RECEIVED BY: DATE RECEIVED: RETURN TO' Terry Obeney BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 RECEIVED JUL 1 6 1992 Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION June 22, 1992 BP Exploration (Alaska) Inc. 900 East Benson Boulevard Re. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Mr. Larry Grant Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject: Point Mclntyre #13 Well Data Transmittal CONFIDENTIAL ~ I' Please acknowledge receipt of the following Pt. Mclntyre #13 data. Additional material will be sent as we receive it from the vendor. MUD LOGS ~ ~ (One paper sepia each and one b~'ueline each) Digital Mud Logging 7/20-8/4/91 Epoch Well Logging CORING SUMMARY Core Analysis Report (one paper copy) LOGGING SUMMARY 9/10/92 Core Labs Final Composite °"//'Micro Icg- Gamma o.17 Natural Gamma Ray Spectrometry Log.-~ 8/5/91 8/5/91 Schlumberger Schlumberger Schlumberger Schlumberger Dual Induction - SFL- GR ~ ,ttf~ 8/5/91 Borehole Compensated Sonic Log v'/ ~0'r,~ 8/5/91 Lithe Density-Neutron (Raw)~ ' ~ ~ f ~5~f VED Schlumberger Repeat Formation Test / X~~ 8~13 ~992 Schlumberger ~ Alas~ Oit& Gas ?ns. Commisslo. Anchorage MWD Logs (One paper sepia each and one blueline each),'"' -,/= Lo~.~' amma s ct,ona,. True ve~ical Depth Log (?, 5"~ 8/5/91 Schlumberger Cased Hole Logs (One p~per sepi~ e~ch ~nd one blueline e~ch) v GCT Gyro Directional Su~ey ~ ¢ 8/11/91 Schlumberger Cement Bond Log (CBT) %w~ ~ 8/11/91 Schlumberge~ Cement Evaluation Log (CET)~ ~ ~ 8/11/91 Schlumberger Composite Run (One digital tape and one verification listing) Open Hole Wireline Logs ~ .('"2~/~ ~ Field Tape files 9, 10, 11, 13, 18, 19~~?~ DIRECTIONAL SURVEYS 8114/9e-y''/ 8/6/91 '''//'' Schlumberger Schlumberger Subsurface Directional (1 digital tape and one verification listing) Subsurface Directional Survey (GCT)-Cf;/' RECEIVED BY: DATE RECEIVED: 8/1 1/91 Schlumberger RETURN TO: Terry Obeney BP Exploration (Alaska)Inc. P.O. Box 196612 Anchorage, AK 99519-6612 RECEIVED dUN 2 5 ~ 0ii & Gas Cons° Anchorage ,..t t.t 'n (..'.) :J. !ii: , -I'i. ¢:) C) "') '1:" 'f: 0 'fl'! WALTER J. HICKEL, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION April 14, 199[ 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 John Trautwein Core Store BP Exploration(Alaska), Inc. 1310 West 56th Avenue Anchorage, Alaska 99501-1433 Re: Inadequate or missing samples Well Name: Pt McIntyre #13 Permit Number: 91-91 Dear Mr. TraUtwein: The Alaska Oil and Gas Conservation Commission requests the operator of the above~ referenced well to resubmit the dry ditch /'core sample intervals listed on the attached transmittal(s). Sample sets have been received by the Commission, however during the verification process, some intervals have been deemed either inadequate or were not submitted. The intervals are listed on the attachment, please submit these listed intervals as soon as possible. The following is an excerpt from the Alaska Oil and Gas Commission Regulations: 20 AAC 25.071. Geological Data and Logs. stipulates that operator shall: (b) within 30 days after completion, suspension, or ~ban=~nme,~t of a drilling well the operator shall file with the commission (2) a complete set of washed and dried, legibly- identified samples of all drill cuttings, as caught by the operator in accordance with good geological practices, cons~ting~o of a minimum of one-quarter cup in volume or three ounces in weight of cuttings for each sample interval; (3) a lithologic description of all cores and a chip or =~o~ of recovered core; the Chips must chips from each ~^ ~ be representative of the one-foot interval, and must be approximately either one cubic inch in volume or ~ree ounces in weight; If you have any questions in reference to this matter, please contact Larry Grant at (907) 279-1433. ~~~Sincerely ~ , Robert Crandall Senior Petroleum Geologist .~.iaska Oii Gas Conservation Commission 3001 Porcupine Drive §07-279-1433 ,.,c Permit: 9!-9! 8ubie~: ~ Receipt of the following core samples. These samples are hereby acknowledged as being..-oceived. CORE ! 2 3 INTERVALS 12}'59' thru ! 28! 5' 12819' thru 12890' 1 2890' thru 12980' I ~,. ~.~ ql~ ! tlllg ~'~-, .c '-",u,,uw,,,y=-- intervals are inadequate:. 1,.8,., 1291n. ! 28! 9' ! 29! 9 !?R73' ! 29_73 I qO"~l i I 'rH'l rJ~ .4 12814' 1 2941 i 2879' 129z12 12882: 13000 I ,~l 0 i~i ~' I ~u.~ 13001 ~) 1 I ,_9,6' 13050 Copy sentto sender: Yes ~o ~ TI.. ,,,e following intervals 'were not submitted: 12816' !_~8!7' 1~..18' ALAS'- IL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG . 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] '2. Name of Operator 7. Permit Number BP Exploration 91-91 ,3. Address 8. APl Number P, O, Box 196612, Anchorage, Alaska 99519-6612 $0- 029-22192 ;4. Location of well at surface_ 9. Unit or Lease Name Field and Pool 3343'FSL, 3316' FWL, SEC. 12, T12N, R14E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Sedal No. KBE = 39.11' I ADL 365548 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. ol Completions 07-12-91 08-04-91 08-12-91I N/Aeet MSL~1 one 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey ~20. Depth where SSSV set ~1. Thickness of Permafrost 13250'MD/9409'TVD 13149'MD/9316'TVD YES E~ NO []! 2137feet MD! 1735' 22. Type Electric or Other Logs Run DIL/SP/GR/BHC, FDC/CNL/GR, RFT 23. CASING, LINER AND CEMENTING RECORD SE'I-rING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEM~ RECORD AMOUNT PULLED Surface 13-3/8"' 68# L-80 Surface 3149' 17-1/2" 5400 sx Permaftost 9-5/8' 47# NTSOS Surface 12737' 12-1/2" 638 cu ft Class G 7' 26# NT80S 12420' 13229' 8-1/2" 319 cuft Class G 24. Perlorations open to Production (MD+TVD of Top and Bottom and 25. TUBING REOORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET {MD) Well not perforated 4-1/2" 12.6# 12471' 12387' ~6. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 13-3/8"X 9-5/8" Downsgueeze Annulus w/220 bbls Diesel 27. PROBUOTK3N TEST Date First Production IMethod of Operation (Flowing', gas lift, etc.) Not yet on Production I N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD I~ Fl~w Tubing Casing Pressure CALCULATED..~ OIL-BBL GAS-MCF WATER-BBL ~IL GRAVITY-APl (corr) Press. 24-HOUR RATE Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. ,~rr~(~e~hi~s.v r,,. d/kN t99P- Alask 'Anoho_raii Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ~' ~: ~ -:~ '~ ~-~ 30. GEOLQGIC MARKERS F,.,r~MATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VENT. BEPTH GOR, and time of each phase. HRZ 12722' 8879'ss Kuparuk 12744' 8900'ss Miluveach 13102' 9233'ss 31. LIST OF ATTACHMENTS 32. I hereby ced/fy that the foregoing is true and correct to the best of my knowledge Sign C.///~~~~. Title Sen/or TechnicalAssistant Date /'~' % INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 0 1 2 ISLAND (M~L~S) GWYDYR BAY POINT STORKERSEN POINT MCINTYRE No. 13 LAT. = 70'23'59.69" LONG. = 14.8'31 '28.56" y = 5,998,055.51 A.S.P. X -- 681,271.53 ZONE 521' FROM NORTH LINE 1,022' FROM WEST LINE SURVEYOR S CERTIFICATE I hereby certify that I am pop y registered and licensed to practice land surveying in the store of Alaska, . ond thor th~s pl~t represents o '~ .... ~"~ "~ ....... ~ .... su~ey made bv me or under my .up.~,.,on. ona ~ho~ ~,, d,m..,;. ~'~=;,o"';'; ~..~h~ ~'"'"'"'"'"'"~ ond other detoils ore co~ect. .... ~egistered Land Surve~r T~HIS SURVEY 1" = 5280' EIVED 31 ~992 Gas Cons. buritrnissiO A.,,,h^roqR BP-052 ASBUILT WELL No. 1,3 LOCATED IN PROTRACTEB SECTION 14-, TOWNSHIP 12 NORTH, RANGE 14. EAST, UMIAT MEREDIAN, ALASKA SURVEYED FOR: B.P. EXPLORAIION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 SURVEYED BY: ARCTIC SLOPE CONSULTINO GROUP .301 DANNER SUITE 200 ANCHORAGE, ALASKA 99518 DRAWN BY: DAG IDA.rE: 8/15/91 Western Atlas International A L~on/D~e~ser Company CORE LABORATORIES BP EXPLORATION (ALASKA), INC. CORE ANALYSIS REPORT PT. Mc INTYRE #13 NORTH SLOPE, ALASKA CL FILE NO. BP-3-1441 Performed by' Core Laboratories 8005 Schoon St. Anchorage, AK 99518 (907) 349-3541 Final Report Presented September 10, 1991 These analysis, opinions or interpretations are based on observations and materials supplied by the client to whom, and for whose exclusive and confidential use, this report is made. The interpretations or opinions expressed represent the best judgement of Core Laboratories (all errors and omissions excepted); but Core Laboratories and it's officers and employees assume no responsibility and make no warranty of representation as to the productivity, proper operations, profitability of any oil, gas or other mineral well or formation in connection with which such report is used or relied upon. 8005 Schoon Street, Anchorage, Alaska 99518-3045, (907) 349-3541, Fax (907) 344-2823 INTRODUCTION Core Laboratories was requested to perform a core analysis study on behalf of BP Exploation (Alaska), Inc. for samples recovered from the Point McIntyre #13 well from the North Slope, Alaska. Presented herein are the results of this study. Conventional cores cut with a bland mud were processed on site by Core Laboratories and BP personnel. Service description and methodology are presented in section 1. The core analysis results and lithological descriptions are presented in section 2. A statistical summary and plots are presented in section 3. Section 4 contains copies of shipping and receiving transmittals. In conjunction with the report, the tabular results of the analysis are supplied on an IBM PC compatible diskette. We sincerely appreciate this opportunity to be of service and hope these data prove beneficial in the development of this reservoir. Section 1 2 3 4 CONVENTIONAL CONVENTIONAL CONVENTIONAL TRANSMITTALS, TABLE OF CONTENTS CORE ANALYSIS, SERVICE DESCRIPTION CORE ANALYSIS, TABULAR RESULTS CORE ANALYSIS, STATISTICAL DATA AND DATA DISKETTE SECTION 1 CONVENTIONAL CORE ANALYSIS, SERVICE DESCRIPTION RECEIVED JUN 2 3 'lPq;: Alaska 0il & Oas C..~' ~,~'~sst(,,.r Anchorage SECTION 1 CONVENTIONAL CORE Fi el d Procedures Conventional coring equipment in conjunction with a bland mud drilling fluid was used to extract core samples during August of 1991. Two Core Laboratories field personnel assisted with wellsite core handling. The fiberglass inner barrels were removed from the core barrels and moved from the rig floor'to the pipe shed. There the barrels were depth marked and double striped, red on the right and black on the left for orientation. After marking the fiberglass barrels were cut into three foot sections. Chip samples were taken by BP personnel from core near the cut points. The three foot sections were then rubber capped. These caps were secured with clamps. The capped three foot sections were put into boxes which were wrapped in plasic bubble wrap, and finally, placed in wooden crates for shipment to Core Laboratory's Anchorage facility. Conventional Core Processing Upon arrival at Core Laboratories Anchorage facility, the fiberglass barrels were removed from their boxes, placed ir, depth order, and surface core gamma logged one core at a time. Once gamma logged the core sections were removed from their barrels, fit together, oriented, depth marked and double striped to help maintain proper orientation. Horizontal plugs were then drilled, using brine as a coolant, from each foot and trimmed into right cylinders. The horizontal plugs were wrapped immediately in foil and refrigerated. The plug trim ends were placed in plastic bags and boxed. The plugging completed, the whole core was then slabbed into two third and one third library sections, with appropriate depths being marked on both. One set of state chips were taken from the two third sections. Both the one third and two third slabbed sections were then boxed according to depth. The two third sections were also photographed with visible and ultra violet light. Approximately fifteen feet of core appears in each photograph. Four sets of photographs have been included in separate binders. Conventional Analysis Techniques Dean-Stark Fluid Saturation Measurements Water was extracted from the horizontal plug samples by Dean-Stark technique using toluene. Samples were removed from the Dean-Stark and placed in toluene for hydrocarbon extraction a minimum of two days, or until no fluorescence was visible. Extracted samples were dried in a convection oven at 250 degrees F. for a minimum of 24 hours, and cooled in a desiccator to room temperature before porosity and permeability was measured. Saturations by Dean-Stark methods were calculated using Equations 1 and 2. Where: So : [((W1 - W2 - H20)/Do)/Vp] x 100 Sw = [H20/Vp] x 100 So = Oil Saturations, Percent Sw = Water Saturation, Percent W1 : Natural Weight W2 : Extracted and Dried Weight H20 : Extracted Water,.Density Assumed 1.0 gm/cc Do : Density of Oil Vp : Pore Volume (2) Grain Density Grain volume determinations were measured on the horizontal samples according to Boyle's Law utilizing the Extended Range Helium Porosimeter. Grain densities were calculated using Equation 3. Dg : Mg/Vg (3) Where: Dg = Grain Density Vg = Grain Volume Mg = Grain Mass Atmospheric Porosity The horizontal plug samples were measured for bulk volume by mercury displacement at ambient conditions. Porosity was calculated using Equation 4. P : [(Vb-Vg) ? Vb)] x 100 (4) Where: P = Porosity, Percent Vb = Bulk Volume Vg = Grain Volume Atmospheric Permeability to Air Horizontal and permeabilities were measured in a Hassler type core holder at a confining pressure of 400 psig. Permeability calculations were performed as defined by Darcy's Equation for compressible fluids, Equation 6. Pa x v x 1000 Qa x L x L K = x (6) (P1 - P2)(P1 +P2) 2 Yb Where: K = Permeability v : Gas Viscosity P1 - P2 : Differential Pressure P1 +P2 = Mean Pressure Pa = Atmospheric Pressure Qa = Flow Rate L = Length Vb : Bulk Volume SECTION 2 CONVENTIONAL CORE ANALYSIS, TABULAR RESULTS RECEIVED JUN 2 b 1992 72aska Oil & Gas Cons. Commission Anchorage DEAN-STARK ANALYSIS CORE LABORATORIES Company : BP EXPLORATION (ALASKA), INC. Field : POINT McINTYRE Well : Pt. McINTYRE 13 Formation : EXPLORATION Location : 12-12N-14E UM, Fr NE cot 2044'S 1908'W {BHL) Coring Fluid : BLAND MUD Co,State : NORTH SLOPE, ALASKA Elevation : CORE ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-gl API No. : Analysts: PLB, DJS SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc CORE i 12759.0 - 12815.5 FEET i I 12759.2 499. 24.1 22.2 53.7 2.G8 S$-ltgy,f-mgr pred fgr,wsrtd,sbrnd,modcmt,qtz,glau I 2 12760.2 404. 23.2 20.4 56.9 2.G8 Ss-ltgy,f-mgr pred fgr,wsrtd,sbrnd,modcmt,qtz,glau I 3 12761.2 519. 24.6 21.1 57.8 2.71 S$-ltgy,f-mgr pred fgr,wsrtd,sbrnd,modcmt,qtz,glau i 4 12762.2 731. 23.7 27.6 56.0 2.95 Ss-ltgy,fgr,vwsrtd,sbrnd,w-vwcmt,qtz,glau,occ wh cht,sid i 5 12763.2 578. 23.6 25.3 53.1 2.78 Ss-ltgy,f-mgr pred fgr,wsrtd,sbrnd,modcmt,qtz,glau,sid I 6 12764.4 570. 24.2 21.9 55.5 2.78 Ss-ltgy,f-mgr pred fgr,wsrtd,sbrnd,modcmt,qtz,glau,$id i 7 12765.5 59.0 19.9 22.7 68.4 2.74 Ss-ltolvgy,vf-mgr pred fgr,wsrtd,rnd,modcmt,glau,qtz i 8 12766.2 539. 24.0 19.8 59.1 2.69 Ss-ltgy,fgr,vwsrtd,sbrnd,modcmt,qtz,glau i 9 12767.4 592. 24.7 22.2 58.9 2.70 S$-ltgy,fgr,vwsrtd,sbrnd,modcmt,qtz,glau i 10 12768.4 541. 25.8 18.2 64.1 2.72 Ss-ltgy,fgr,vwsrtd,sbrnd,modcmt,qtz,glau,occ brn cly I 11 12769.3 542. 24.8 23.G 53.G 2.67 Ss-ltgy,fgr,vwsrtd,$brnd,modcmt,qtz,glau I 12 12770.2 592. 24.2 14.7 58.2 2.66 Ss-ltgy,fgr,vwsrtd,sbrnd,modcmt,qtz,glau,occ wh cly I 13 12771.2 545. 24.8 20.6 56.0 2.68 S$-ltgy,fgr,vwsrtd,sbrnd,modcn~c,qtz,glau,wh cbt i 14 12772.4 389. 23.7 18.0 57.3 2.72 Ss-ltgy,fgr,vwsrtd,sbrnd,modcmt,qtz,glau,wh cht,occ sid 1 15 12773.3 0.01 5.0 16.5 77.2 3.17 Ss-ltbrngy,fgr,vwsrtd,sbrnd,vwcmt,qtz,glau,wh cht,sid I 1G 12774.2 487. 25.5 16.8 61.8 2.71 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,wh cht,sid i 17 12775.2 160. 23.3 17.6 65.6 2.76 Ss-ltgy,f-mgr pred fgr,wsrtd,$brnd,modcmt,qtz,glau,tr brn cly I 18 12776.3 0.79 12.1 20.9 62.2 3.10 Ss-ltbrngy,f-n~jr pred fgr,vwsrtd,sbrnd,vwcmt,qtz,glau,wh cht,sid i 19 12777.2 0.51 11.3 28.4 55.5 3.09 Ss-ltbrngy,fgr,vwsrtd,$brnd,vwcmt,qtz,glau,occ wh cht,sid I 20 12778.2 770. 25.1 19.9 56.3 2.66 Ss-ltgy,f-mgr pred fgr,wsrtd,sbrnd,modcmt,qtz,glau,occ wh cht i 21 12779.1 766. 25.3 19.3 62.3 2.68 Ss-mltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,wh cht I 22 12780.3 843. 25.1 17.5 56.1 2.65 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau I 23 12781..2 346. 23.2 18.3 58.5 2.67 Ss-ltgy,fgr,vwsrtd,sbang,wcmt,qtz,glau,wh cht I 24 12782.1 985. 24.4 25.0 54.7 2.73 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,tr wh cbt i 25 12783.2 14G5. 26.6 20.1 56.5 2.66 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,tr wh cbt I - 1 Company : BP EXPLORATION (ALASKA), INC. Well : Pt. McINTYRE 13 CORE CORE LABORATORIES Field : POINT McINTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-gl SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc i 26 12784.4 821. 24.6 22.5 58.4 2.65 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,wh cht I 27 12785.2 743. 25.0 18.9 52.7 2.71 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,tr wh cht i 28 12786.3 550. 26.8 20.2 58.3 2.74 Ss-ltgy,fgr,vwsrtd,rnd,wcmt,qtz,glau,wh cht I 29 12787.2 0.19 6.2 19.2 56.9 3.22 Ss-ltbrngy,fgr,vwsrtd,$brnd,vwcmt,qtz,glau,wh cht,sid i 30 12788.3 427. 23.7 14.5 53.9 2.71 Ss-ltgy,fgr,vwsrtd,rnd,wcmt,qtz,glau,wh cht 1 31 12789.2 396. 24.4 14.5 56.2 2.70 Ss-ltgy,fgr,vwsrtd,sbrnd,modcmt,qtz,glau,tr sid i 32 12790.3 510. 25.1 16.8 55.7 2.66 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau I 33 12791.3 472. 22.8 18.3 51.1 2.84 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau i 34 12792.1 501. 24.9 15.5 54.0 2.73 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau i 35 12793.2 496. 24.9 17.6 53.8 2.70 Ss-ltgy,fgr,vwsrtd,sbrnd,modcmt,qtz,glau 1 36 12794.2 206. 18.7 26.0 53.5 2.88 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,gy sltst i 37 12795.1 1273. 26.1 21.0 50.8 2.65 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cht i 38 12796.6 189. 21.4 25.2 52.1 2.70 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cht,occ gr sltst i 39 12797.1 283. 22.9 25.5 51.9 2.72 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cht,occ gr sltst 0 40 12798.2 358. 23.2 17.5 51.0 2.68 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cht,occ gr sltst I 41 12799.2 564. 23.4 21.2 45.4 2.66 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cht i 42 12800.2 447. 23.4 21.9 46.2 2.67 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cbt i 43 12801.2 466. 24.5 23.3 49.8 2.76 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cbt i 44 12802.4 177. 21.8 30.2 52.5 2.83 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cbt i 45 12803.2 4.26 15.2 24.6 50.2 3.02 Ss-ltgy,vf-fgr,pred fgr,wsrtd,sbang,vwcmt,qtz,glau,wh cht,carb cmt i 46 12804.3 646. 25.2 20.8 52.8 2.66 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau i 47 12805.2 197. 21.5 21.3 55.4 2.82 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,wh cbt I 48 12806.2 1049. 27.3 21.9 53.3 2.68 Ss-ltgy,fgr,r mgr,vwsrtd,rnd,wcmt,qtz,glau,occ brn cly i 49 12807.2 179. 23.1 17.5 62.5 2.73 Ss-ltgy,f-mgr pred fgr,wsrtd,sbrnd,wcmt,qtz,glau,wh cbt i 50 12808.2 228. 21.4 23.5 54.2 2.89 Ss-ltgy,fgr,r mgr,vwsrtd,sbrnd,w-vwcmt,qtz,glau,wh cht,wh carb cmt I 51 12809.1 93.7 20.4 17.0 60.9 2.72 Ss-ltgy,fgr,r cgr,wsrtd,sbrnd,mod-wcmt,qtz,glau,wh cht,brn cly I 52 12810.2 630. 26.1 17.7 57.2 2.66 Ss-ltgy,fgr,r cgr,vwsrtd,sbrnd,wcmt,qtz,glau,wh cbt I 53 12811.3 42.2 18.1 18.8 63.6 2.91 Ss-ltgy,fgr,r cgr,wsrtd,sbrnd,mod-wcmt,qtz,glau,wh cht,brn cly I 54 12812.3 50.3 17.1 22.6 6G.G 2.84 Ss-ltgy,fgr,r cgr,wsrtd,sbrnd,mod-wcmt,qtz,glau,wh cht,brn cly 1 -2 Company : BP EXPLORATION (ALASKA), INC. Well : Pt. McINTYRE 13 CORE CORE LABORATORIES Fi el d : PO I NT Mc I NTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-gl " SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 1 55 12813.2 15.6 18.3 19.8 55.9 3.03 Ss-ltgy,fgr,wsrtd,sbrnd,wcmt,qtz,glau,wh cht 1 56 12814.2 176. 22.0 40.3 40.2 2.68 Ss-ltgy,fgr,wsrtd,sbrnd,wcmt,qtz,glau,brn cly,occ wh cbt I 57 12815.2 603. 26.2 17.1 61.3 2.67 Ss-ltgy,fgr,r cgr,vwsrtd,sbrnd-rnd,wcmt,qtz,glau,wh carb cmt CORE 2 12819.0 - 12890.1 FEET 2 1 12819.2 304. 24.9 12.3 70.0 2.68 Ss-ltgy,fgr,r mgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cht 2 2 12820.7 145. 22.9 42.8 45.2 2.76 Ss-ltgy,fgr,vwsrtd,$brnd,w-vwcmt,qtz,glau 2 3 12821.5 194. 23.4 34.3 51.4 2.68 Ss-ltgy,fgr,vwsrtd,rnd-sbrnd,wcmt,qtz,glau,brn cly 2 4 12822.2 150. 20.6 24.9 59.8 2.73 Ss-ltgy,fgr,vwsrtd,rnd-sbrnd,wcmt,qtz,glau,brn cly 2 5 12823.2 74.2 20.1 40.4 42.0 2.66 Ss-ltgy,fgr,vwsrtd,rnd-sbrnd,wcmt,qtz,glau,brn cly, wh cht 2 6 12824.5 192. 21.4 33.9 42.6 2.67 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,occ wh cht 2 7 12825.2 167. 21.5 32.4 48.4 2.69 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,wh cht 2 8 12826.3 94.5 20.7 48.2 30.2 2.66 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,wh cbt 2 9 12827.4 60.6 20.5 44.7 36.8 2.74 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau,wh cht,occ brn cly 2 10 12828.2 66.5 21.5 40.9 38.2 2.77 Ss-ltgy,fgr,r cgr,vwsrtd,sbrnd,wcmt,qtz,glau,brn cly 2 11 12829.2 57.3 19.0 29.9 51.G 2.86 Ss-mltgy,fgr,r mgr,vwsrtd,sbrnd,modcmt,qtz,glau 2 12 12830.2 157. 23.3 40.1 59.9 2.76 Ss-mltgy,fgr,r mgr,vwsrtd,sbrnd,modcmt,qtz,glau 2 13 12831.2 68.8 21.4 43.3 46.6 3.04 Ss-ltbrngy,f-cgr pred fgr,wsrtd,sbrnd,vwcmt,qtz,glau,sid cmt 2 14 12832.2 26.1 22.5 35.4 58.9 2.76 Ss-ltbrngy,fgr,vwsrtd,sbrnd,wcmt,qtz,glau 2 15 12833.7 6.48 17.7 41.2 51.4 2.88 Ss-ltbrngy,fgr,brn cly len,wsrtd,sbrnd,wcmt,qtz,glau 2 16 12834.3 97.9 21.4 43.5 54.1 2.71 Ss-ltbrngy,vf-fgr,pred fgr,wsrtd,rnd,qtz,glau 2 17 12835.G 89.5 15.5 46.4 41.7 3.20 Ss-ltbrngy,vf-mgr,pred fgr,wsrtd,sbrnd,mod-vwcmt,qtz,glau,sid,frac 2 18 12836.4 62.3 20.2 39.2 50.3 2.69 Ss-ltbrngy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau,tr brn cly 2 19 12837.6 871. 28.9 44.1 40,2 2.91 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau 2 20 12838.2 542. 28.8 50.4 36.1 2.78 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcnfc,qtz,glau 2 21 12839.3 7.63 15.4 34.7 52.9 3.14 Ss-ltbrngy,vf-fgr,pred fgr,vwsrtd,sbrnd,vwcmt,qtz,glau,sid cmt,frac 2 22 12840.2 276. 24.5 45.6 44.0 2.70 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau 2 23 12841.6 0.44 4.8 20.8 74.6 3.16 Ss-mltgy,vf-mgr,pred fgr,wsrtd,rnd,vwcmt,qtz,glau,wh cht,sid I -3 Company : BP EXPLORATION (ALASKA), INC. Well : Pt. McINTYRE 13 CORE CORE LABORATORIES Fi el d : PO INT Mc I NTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-g1 'SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 2 24 12842.2 1.26 6.6 21.3 73.5 3.20 Ss-mltgy,vf-mgr,pred fgr,wsrtd,rnd,vwcmt,qtz,glau,wh cht,sid 2 25 12843.4 241. 23.8 29.3 56.7 2.68 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau 2 26 12844.2 171. 23.7 36.9 48.7 2.70 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau 2 27 12845.4 212. 22.4 40.4 44.6 2.69 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcm~,qtz,glau 2 28 12846.2 7.70 17.3 34.4 56.5 2.75 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau,occ brn cly len 2 29 12847.2 15.3 18.3 30.0 56.3 2.69 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau,occ brn cly len 2 30 12848.4 31.9 21.2 35.8 53.7 2.73 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau,occ brn cly len 2 31 12849.2 20.2 20.6 32.5 49.3 2.99 Ss-ltgy,vf-mgr,pred vfgr,wsrtd,sbrnd,vwcmt,qtz,glau,carb cmt 2 32 12850.2 45.9 23.4 33.1 49.1 2.76 Ss-ltgy,vf-mgr,pred vfgr,wsrtd,sbrnd,vwcmt,qtz,glau,carb cmt 2 33 12851.2 78.6 22.5 35.2 46.8 2.69 S$-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau,wh carb cmt 2 34 12852.2 1.79 16.0 22.6 67.3 2.68 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau,wh carb cmt,occ brn cly 2 35 12853.3 0.01 8.8 41.2 53.8 3.19 Ss-ltbrngy,vf-mgr,pred fgr,vwsrtd,rnd,vwcmt,qtz,glau,carb cmt 2 36 12854.8 0.11 11.9 14.1 72.6 3.18 Ss-ltbrngy,vf-mgr,pred fgr,vwsrtd,rnd,vwcmt,qtz,glau,carb cmt 2 37 12855.2 96.2 18.6 33.1 57.7 3.09 Ss-ltbrngy,vf-mgr,pred fgr,vwsrtd,rnd,vwcmt,qtz,glau,carb cmt 2 38 12856.1 1.77 14.0 26.8 66.8 2.81 Ss-ltbrngy,vf-mgr,pred fgr,vwsrtd,rnd,vwcmt,qtz,glau,carb cmt/brn cly 2 39 12857.2 224. 23.6 36.8 50.7 2.72 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau 2 40 12858.6 66.0 22.0 48.9 40.9 2.87 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcm~,qtz,glau 2 41 12859.3 241. 24.2 38.3 42.3 2.68 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau 2 42 12860.2 91.6 22.2 42.7 42.2 2.68 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcnfc,qtz,glau 2 43 12861.3 14.6 19.9 46.0 53.0 2.67 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau 2 44 12862.3 16.1 20.4 42.7 40.1 2.66 Ss-ltbrngy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,glau,carb cmt 2 45 12863.3 8.27 19.4 46.5 43.1 2.67 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,glau,carb cmt 2 46 12864.2 3.98 18.1 34.0 51.5 2.69 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,glau,carb cmt 2 47 12865.2 24.8 22.2 36.3 45.3 2.69 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,glau,carb cmt,wh cbt 2 48 12866.2 8.79 20.6 37.0 52.3 2.70 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,glau,carb cmt 2 49 12867.4 2.81 17.8 35.7 50.7 2.68 S$-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,glau,carb cmt 2 50 12868.2 3.13 18.5 30.9 55.3 2.68 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,glau,carb cmt 2 51 12869.3 1.80 17.2 27.2 60.2 2.67 Ss-ltbrngy,vf-vcgr,pred vfgr,modsrtd,sbrnd,wcmt,qtz,glau,carb cmt 2 52 12870.2 1.03 15.9 24.4 63.3 2.73 Ss-ltgy,vf-cgr,pred vfgr,modsrtd,sbrn,wcmt,qtz,glau,carb cmt 1 -4 Company : BP EXPLORATION {ALASKA), INC. Well : Pt. McINTYRE 13 CORE CORE LABORATORIES Field : POINT llcINTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-gl SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 2 53 12871.2 6.60 18.8 26.3 56.4 2.71 Ss-ltgy,vf-cgr,pred vfgr,modsrtd,sbrn,wcmt,qtz,glau,carb cmt 2 54 12872.4 5.66 17.2 27.5 59.7 3.08 Ss-ltbrngy,vf-mgr,pred vfgr,wsrtd,rnd,wcmt,qtz,glau 2 55 12873.3 130. 23.0 34.7 50.8 2.67 Ss-ltgy,vf-fgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 56 12874.2 36.5 22.3 3.2 78.4 2.69 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 57 12875.3 323. 27.0 37.3 52.5 2.79 Ss-ltgy,vf-cgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 58 12876.8 45.8 16.2 19.5 57.9 2.98 Ss-ltbrngy,vf-cgr,pred fgr,wsrtd,rnd,vwcmt,qtz,glau,sid,frac 2 59 12877.2 66.5 22.1 43.9 43.7 2.73 Ss-ltbrngy,vf-cgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 60 12878.8 42.8 19.3 22.0 58.5 2.70 Ss-ltbrngy,vf-cgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 61 12879.4 64.9 20.8 36.8 47.1 2.68 Ss-ltbrngy,vf-cgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 62 12880.4 3.8 41.3 48.2 3.15 Ss-ltbrngy,vf-mgr,pred fgr,wsrtd,rnd,vwcmt,qtz,glau,sid 2 63 12881.2 66.6 20.3 35.6 47.2 2.71 Ss-ltbrngy,vf-cgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 64 12882.1 212. 22.4 32.1 47.1 2.67 Ss-gngy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 65 12883.2 218. 23.0 31.8 49.2 2.70 Ss-gngy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 66 12884.6 454. 24.3 24.2 54.7 2.68 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 67 12885.G 108. 22.2 38.0 46.1 2.73 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau 2 68 12886.2 75.4 20.8 36.2 48.9 2.70 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 2 69 12887.3 147. 21.8 26.3 53.9 2.69 Ss-ltgy,vf-fgr,pred vfgr,wvsrtd,rnd,wcmt,qtz,glau 2 70 12888.2 114. 21.1 34.1 53.6 2.70 Ss-ltgy,vf-fgr,pred vfgr,wvsrtd,rnd,wcmt,qtz,glau 2 71 12889.2 214. 22.9 35.8 43.6 2.69 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau CORE 3 12890.0 - 12980.4 FEET 3 i 12890.G 144. 21.2 24.0 54.0 2.68 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau 3 2 12891.2 33.5 19.8 26.8 53.7 2.67 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,glau,occ wh cbt 3 3 12892.3 80.2 21.8 31.3 48.4 2.68 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 3 4 12893.3 96.8 21.9 31.2 47.4 2.67 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 3 5 12894.1 6.82 16.9 31.5 52.3 2.70 Ss-ltgy,vf-cgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau 3 6 12895.2 28.0 19.1 29.3 50.7 2.73 Ss-ltgy,vf-bcgr,pred fgr,modsrtd,rnd,wcmt,qtz,glau,wh cbt 3 7 12896.2 53.7 19.4 16.9 58.8 2.69 Ss-ltgy,vf-cgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau,wh cht I -5 Company : BP EXPLORATION (ALASKA), INC. Well : Pt. McINTYRE 13 CORE CORE LABORATORIES Field : POINT NcINTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-91 I SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 3 8 12897.2 322. 24.2 21.9 53.1 2.66 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,glau,wh cht 3 9 12898.2 368. 24.9 26.2 49.8 2.66 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 10 12899.1 315. 24.7 18.3 54.2 2.64 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 11 12900.3 456. 26.0 22.7 56.0 2.68 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 12 12901.3 396. 25.2 26.8 51.2 2.69 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 13 12902.5 441. 25.4 25.2 50.9 2.66 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 14 12903.3 417. 25.5 24.9 52.7 2.67 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 15 12904.4 278. 23.8 23.6 53.1 2.67 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 16 12905.3 228. 22.9 25.7 52.0 2.69 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 17 12906.3 261. 24.0 27.4 50.2 2.70 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 18 12907.4 441. 25.2 24.4 52.6 2.67 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glsu 3 19 12908.3 334. 25.0 25.9 52.6 2.69 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 20 12909.4 287. 24.4 28.8 53.9 2.73 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 21 12910.3 343. 25.0 25.6 53.7 2.65 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 22 12911.3 209. 22.7 30.0 50.4 2.73 Ss-lt§y,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 23 12912.3 305. 23.9 25.9 51.9 2.65 Ss-ltgy,fgr,vwsrtd,$brnd,wcmt,qtz,wh cht,occ glau 3 24 12913.3 260. 23.2 26.5 52.0 2.65 S$-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau S 25 12914.3 316. 24.0 25.5 52.5 2.65 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ 91au 3 26 12915.2 342. 24.4 26.7 52.2 2.65 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 27 12916.2 90.4 19.8 24.1 52.2 2.65 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau,occ brn cly lam 3 28 12917.3 144. 20.7 23.2 50.3 2.65 Ss-ltgy,fgr,vwsrtd,rnd,wcmt,qtz,occ wh cht&glau,tr brn cly 3 29 12918.3 177. 22.4 26.2 51.1 2.65 Ss-ltgy,fgr,vwsrtd,rnd,wcmt,qtz,occ wh cht&glau,tr brn cly 3 SO 12919.4 214. 23.1 27.8 47.5 2.70 Ss-ltgy,fgr,vwsrtd,rnd,wcnlt,qtz,occ wh cht&glau,tr brn cly 3 31 12920.2 123. 18.3 22.6 56.1 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ wh cht&glau,tr brn cly 3 32 12921.1 78.7 17.7 31.4 41.8 2.93 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,vwcmt,qtz,occ wh cht,tr glau,sid 3 33 12922.2 98.0 20.6 23.8 53.3 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,glau,tr brn cly 3 34 12923.2 111. 18.9 24.1 52.3 2.65 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ glau,tr brn cly 3 35 12924.2 57.1 17.1 21.2 56.7 2.65 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcn~,qtz,occ glau,tr brn cly 3 36 12925.2 159. 22.1 24.3 54.3 2.64 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcm~,qtz,occ glau,tr brn cly I -6 Company : BP EXPLORATION (ALASKA), INC. Well .' Pt. McINTYRE 13 CORE CORE LABORATORIES Fi el d : PO I NT Nc I NTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-91 SATURATION' SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 3 37 12926.3 172. 19.9 24.0 55.6 2.64 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ glau,tr brn cly 3 38 12927.3 131. 22.0 27.3 48.0 2.64 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ glau 3 39 12928.3 120. 18.8 31.3 48.3 2.64 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ glau,tr brn cly 3 40 12929.2 115. 18.7 29.0 51.9 2.G4 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ glau,tr brn cly 3 41 12930.3 20.4 17.0 28.9 52.2 2.71 Ss-ltbrngy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ glau,tr brn cly tr sid 3 42 12931.3 103. 18.9 27.2 53.1 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ glau,tr bit 3 43 12932.3 129. 19.6 22.4 57.7 2.64 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ glau,tr bit 3 44 12933.2 40.0 19.3 22.3 56.6 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ glau 3 45 12934.3 2.84 12.9 17.8 65.0 2.75 Ss-mltgy,vf-fgr,pred vfgr,wsrtd,rnd,wcmt,qtz,wk cly lam, glau 3 46 12935.6 6.79 15.6 14.0 66.7 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ glau,wk cly lam 3 47 12936.2 80.2 18.4 12.8 66.7 2.64 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ glau,wk cly lam 3 48 12937.2 14.2 17.3 11.5 66.2 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ glau,wk cly lam 3 49 12938.2 4.35 13.6 13.5 63.9 2.89 Ss-mltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,occ glau,sid,frac 3 50 12939.3 15.0 15.3 1.5 77.8 2.64 Ss-ltgy,vf-vcgr,pred vfgr,wsrtd,rnd vwcmt,qtz,occ glau,wk cly lam 3 51 12940.2 405. 23.4 25.6 51.0 2.77 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,vwcmt,qtz,occ glau&wh cbt 3 52 12941.3 1644. 24.9 16.7 58.1 2.68 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,vwcmt,qtz,occ glau&wh cht 3 53 12942.2 1729. 25.2 21.3 56.7 2.G8 Ss-ltgy,vf-mgr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 54 12943.2 134. 21.7 14.4 63.2 2.80 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,occ wh cht&glau 3 55 12944.2 133. 20.1 1G.1 57.7 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,occ wh cht&glau,tr brn cly 3 56 12945.2 119. 21.7 20.2 55.4 2.71 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,vwcmt,qtz,occ glau 3 57 12946.2 64.2 18.3 10.7 63.1 2.66 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,vwcm~c,qtz,occ glau 3 58 12947.2 61.4 17.9 6.4 67.8 2.64 Ss-ltgy,vf-mgr,pred fgr,wsrtd,rnd,vwcmt,qtz,occ glau,tr brn cly 3 59 12948.2 366. 24.6 18.7 57.7 2.70 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 60 12949.3 38.4 19.9 1.4 71.4 2.91 Ss-ltgy,vf-mgr,pred fgr,wsrtd,sbrnd,vwcmt,qtz,occ wh cht&glau 3 61 12950.5 1008. 24.7 8.5 71.6 2.71 Ss-ltgy,vf-mgr,pred fgr,wsrtd,sbang-sbrnd,wcmt,qtz,wh cht,occ glau 3 62 12951.3 162. 22.5 10.1 70.8 2.79 Ss-ltgy,vf-cgr,pred fgr,modsrtd,sbrnd,wcmt,qtz,occ wh cht&glau 3 63 12952.2 81.9 20.8 8.9 72.2 2.81 S$-ltgy,vf-cgr,pred fgr,modsrtd,sbrnd,wcmt,qtz,occ wh cht&glau 3 64 12953.2 34.5 20.0 9.6 67.0 2.90 Ss-ltbrngy,vf-vcgr,pred fgr,modsrtd,rnd,vwcmt,qtz,wh cht,glau,carbcmt 3 65 12954.2 113. 21.2 7.6 69.7 2.74 Ss-ltgy,f-vcgr,pred mgr,modsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 1 -7 Company : BP EXPLORATION (ALASKA), INC. Well : Pt. McINTYRE 13 CORE CORE LABORATORIES Field : POINT McINTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-91 SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 3 66 12955.2 519. 21.1 8.9 70.0 2.72 S$-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ glau 3 67 12956.3 40.4 17.6 4.9 67.6 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau,tr gy cly 3 68 12957.9 21.5 14.2 19.2 51.6 2.97 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,vwcmt,qtz,whcmt,occ glau 3 69 12958.3 115. 20.0 9.6 66.9 2.70 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,w-vwcmt,qtz,carb cmt,occ glau 3 70 12959.3 19.4 16.9 9.3 70.1 2.65 Ss-mltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau,cly lam 3 71 12960.3 56.5 15.9 13.7 56.4 2.87 Ss-ltgy,vf-mgr,pred fgr,wsrtd,sbrnd,vwcmt,qtz,occ glau 3 72 12961.3 95.6 19.9 7.5 68.4 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 73 12962.3 6.32 15.1 8.0 71.4 2.65 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ glau,wk cly lam 3 74 12963.3 3.35 14.1 8.7 70.8 2.65 S$-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcn~c,qtz,occ glau,wk cly lam 3 75 12964.2 47.1 18.2 10.5 67.7 2.77 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcm~,qtz,occ glau,wk cly lam 3 76 12965.2 28.8 11.7 73.2 2.68 S$-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ wh cht&glau,rbl 3 77 12966.2 56.6 18.4 9.8 66.8 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ glau,wk cly lam 3 78 12967.2 125. 20.7 G.9 66.9 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,vwcmt,qtz,wh cht,tr glau,tr bit 3 79 12968.3 74.4 18.4 12.6 62.0 2.65 S~-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,vwcmt,qtz,wh cht,tr glau,tr bit 3 80 12969.3 27.1 15.9 7.4 66.3 2.65 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,vwcmt,qtz,wh cht,tr glau,tr bit 3 81 12970.2 371. 23.6 7.5 67.1 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 82 12971.2 740. 26.9 6.9 68.6 2.68 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 83 12972.2 608. 26.3 0.4 75.2 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 84 12973.3 815. 27.2 6.3 71.2 2.65 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 85 12974.6 809. 28.9 7.0 71.8 2.65 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 86 12975.9 942. 27.7 9.0 69.8 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,modcn~c,qtz,wh cht,occ glau 3 87 12976.4 614. 26.6 2.2 75.9 2.76 Ss-vltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 3 88 12977.3 28.5 12.7 74.6 2.66 Ss-vltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau,rbl 3 89 12978.1 882. 28.3 7.7 71.2 2.67 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,occ wh cht&glau 3 90 12979.2 1008. 28.1 5.2 71.9 2.67 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,occ wh cht&glau 3 91 12980.2 1160. 28.7 1.2 70.8 2.66 Ss-ltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,occ wh cht&glau I -8 Company : BP EXPLORATION (ALASKA), INC. Well : Pt. McINTYRE 13 CORE CORE LABORATORIES Field .' POINT McINTYRE Formation : EXPLORATION ANALYSIS RESULTS File No..- 8P-3-1441 Date : 20-SEPT-g1 SATURATION SAMPLE DEPTH PERMEABILITY. POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md '% % % gm/cc CORE 4 12981.0 - 13071.8 FEET 4 1 12981.3 957. 28.3 9.2 78.3 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,mod wcmt,qtz,occ wh cht,tr glau 4 2 12982.3 1042. 28.7 6.4 64.4 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,mod wcmt,qtz,occ wh cht,tr glau 4 3 12983.3 1016. 28.7 8.3 61.9 2.66 S$-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,mod wcmt,qtz,occ wh cht,tr glau 4 4 12984.3 1187. 28.7 6.5 62.7 2.65 S$-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,mod wcmt,qtz,occ wh cht,tr glau 4 5 12985.3 937. 27.2 7.9 66.5 2.64 S~-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,mod wcmt,qtz,occ wh cht,tr glau 4 6 12986.2 1113. 27.7 5.9 68.2 2.67 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,mod wcmt,qtz,occ wh cht,tr glau 4 7 12987.3 133. 20.4 9.6 64.8 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau,wk cly 4 8 12988.4 12.4 16.1 9.8 71.1 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau,wk cly 4 9 12989.2 67.4 18.7 0.1 74.1 2.67 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau,wk cly 4 10 12990.3 128. 20.4 5.9 68.9 2.64 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau,wk cly 4 11 12991.2 13.2 15.3 6.6 75.5 2.65 Ss-mltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,occ wh cht,cly lam,tr glau 4 12 12992.2 51.0 18.4 8.0 70.7 2.67 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau,wk cly 4 13 12993.3 56.7 18.1 8.9 68.3 2.71 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,carb cmt,tr glau 4 14 12994.6 9.33 15.4 6.4 71.3 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,tr glau,wk cly lam 4 15 12995.3 98.3 19.3 10.2 63.1 2.76 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,tr glau,occ cly lam 4 16 12996.2 142. 21.2 5.5 66.9 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,tr glau,occ cly lam 4 17 12997.2 80.5 16.9 5.8 77.0 2.64 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,tr glau,wk cly lam 4 18 12998.3 580. 24.5 6.7 72.2 2.64 Ss-vltgy,vf-mgr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 19 12999.1 697. 26.3 7.8 68.6 2.66 Ss-vltgy,vf-mgr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 20 13000.2 691. 26.1 7.3 70.6 2.65 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 21 13001.3 603. 26.4 6.3 69.6 2.68 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 22 13002.2 642. 26.7 6.8 68.2 2.68 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 23 13003.3 764. 27.3 8.6 66.2 2.67 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 24 13004.2 672. 27.0 6.8 67.7 2.66 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 25 13005.2 690. 27.0 8.8 66.9 2.66 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 26 13006.2 648. 27.4 8.0 67.5 2.66 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 27 13007.2 679. 27.5 5.0 66.5 2.66 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 1 - 9 Company : BP EXPLORATION (ALASKA), INC. Well : Pt. McINTYRE 13 CORE CORE LABORATORIES Fi el d : PO I NT Mc I NTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-91 SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc ..... 4 28 13008.3 546. 26.5 6.9 66.7 2.69 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 29 13009.4 409. 25.4 G.8 64.4 2.71 Ss-vltgy,fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 30 13010.4 548. 25.7 8.3 63.7 2.65 Ss-vltgy,fgr w/r cgr,vwsrtd,rnd,wcmt,qtz,tr wh cht&glau 4 31 13011.3 175. 22.7 7.6 64.8 2.77 Ss-vltgy,fgr w/r cgr,vwsrtd,rnd,wcmt,qtz,tr wh cht&glau 4 32 13012.2 200. 23.2 G.7 64.3 2.74 Ss-vltgy,fgr w/r cgr,vwsrtd,rnd,wcmt,qtz,tr wh cht&glau 4 33 13013.2 207. 23.2 6.2 65.9 2.73 Ss-vltgy,fgr w/r cgr,vwsrtd,rnd,wcmt,qtz,tr wh cht&glau 4 34 13014.2 352. 23.0 6.5 64.6 2.77 Ss-vltgy,fgr w/r cgr,vwsrtd,rnd,wcmt,qtz,tr wh cht&glau 4 35 13015.2 215. 23.4 9.9 63.4 2.73 Ss-vltgy,fgr w/r cgr,vwsrtd,rnd,wcmt,qtz,tr wh cht&glau 4 36 13016.2 129. 22.3 7.6 69.8 2.80 Ss-vltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ wh cht&glau 4 37 13017.3 328. 24.1 9.3 60.0 2.69 Ss-vltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,occ wh cht&glau 4 38 13018.2 354. 25.1 10.4 61.1 2.70 Ss-vltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau 4 39 13019.1 231. 24.4 12.7 61.0 2.72 Ss-vltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau 4 40 13020.3 182. 23.2 13.1 65.0 2.75 Ss-vltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau 4 41 13021.3 505. 25.7 14.5 63.8 2.65 Ss-vltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau 4 42 13022.1 647. 26.4 12.7 66.7 2.65 Ss-vltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau 4 43 13023.3 531. 25.9 22.3 58.5 2.66 Ss-vltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau 4 44 13024.1 583. 25.9 19.4 58.7 2.67 Ss-vltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau 4 45 13025.2 394. 23.8 9.5 68.2 2.66 Ss-vltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau 4 46 13026.2 373. 23.9 6.5 68.2 2.68 Ss-vltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau 4 47 13027.2 4.48 14.5 9.0 74.7 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,wk cly lam, tr glau 4 48 13028.2 27.7 17.4 2.8 81.7 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,wk cly lam, tr glau 4 49 13029.2 5.12 14.9 9.1 72.3 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,wk cly lam, tr glau 4 50 13030.2 21.7 16.6 6.3 74.2 2.73 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,wk cly lam, tr glau 4 51 13031.4 24.7 17.2 12.6 68.6 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,wk cly lam, tr glau 4 52 13032.2 26.4 17.3 11.0 71.4 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,wk cly lam, tr glau 4 53 13033.2 22.8 17.5 7.6 74.8 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,wk cly lam, tr glau 4 54 13034.2 0.71 10.1 15.4 64.1 2.97 Ss-ltbrngy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,occ glau,sid cmt 4 55 13035.4 5.73 14.8 8.2 76.5 2.66 Ss-ltbrngy,vf-fgr,pred vfgr,vwsrtd,rnd,wcnvL,qtz,wh cht,occ glau,wk cly lam 4 56 13036.2 32.1 17.8 8.0 73.9 2.68 Ss-ltbrngy,vf-fgr,pred vfgr,vwsrtd,rnd,wcn~c,qtz,wh cht,occ glau,wk cly lam 1 - 10 Company : BP EXPLORATION (ALASKA), INC. Well : Pt. NcINTYRE 13 CORE CORE LABORATORIES Field : POINT McINTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-g1 SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 4 57 13037.2 17.8 16.4 6.1 74.8 2.65 Ss-ltbrngy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau,wk cly lam 4 58 13038.2 34.9 17.1 6.7 77.3 2.65 Ss-ltbrngy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau,wk cly lam 4 59 13039.2 84.2 18.G 5.3 78.4 2.65 Ss-ltbrngy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau,wk cly lam 4 60 13040.4 83.8 19.6 6.5 68.1 2.65 Ss-ltbrngy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,wh cht,occ glau,wk cly lam 4 61 13041.3 72.6 18.9 5.9 73.6 2.68 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,wcmt,qtz,occ glau,tr brn cly 4 62 13042.2 149. 20.9 4.7 68.9 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 63 13043.2 143. 20.4 4.7 69.0 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau,occ cly lam 4 64 13044.3 127. 20.5 G.8 68.1 2.64 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau,occ cly lam 4 65 13045.3 184. 21.4 3.5 71.8 2.70 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau,occ cly lam 4 $6 13046.2 171. 21.7 4.3 70.4 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau,occ cly lam 4 67 13047.2 227. 22.6 5.8 70.0 2.71 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau,occ cly lam 4 68 13048.2 140. 20.9 4.4 73.2 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau,occ cly lam 4 69 13049.2 88.6 19.7 3.3 75.1 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau,occ cly lam 4 70 13050.2 119. 20.7 4.4 73.3 2.67 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau 4 71 13051.2 208. 23.5 5.9 69.7 2.67 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau 4 72 13052.2 159. 22.5 4.9 71.6 2.67 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau 4 73 13053.2 265. 23.2 6.3 69.7 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau 4 74 13054.2 161. 21.5 4.9 71.4 2.69 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr glau 4 75 13055.2 192. 22.1 39.1 55.3 2.66 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,occ glau 4 76 13056.2 47.6 16.9 6.4 73.2 2.88 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,tr glau 4 77 13057.2 163. 22.4 6.2 72.8 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,tr glau 4 78 13058.2 256. 22.5 5.0 68.1 2.67 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,tr glau 4 79 13059.2 147. 21.3 5.5 69.6 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,tr glau 4 80 13060.1 94.6 20.5 4.7 74.6 2.66 S$-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,tr glau,tr gy cly 4 81 13061.1 114. 19.9 4.6 73.9 2.73 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,tr glau,tr gy cly,occ sid 4 82 13062.1 128. 20.3 5.3 71.0 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,tr glau 4 83 13063.3 44.5 18.6 3.6 77.6 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,wk cly lam, occ glau 4 84 13064.3 35.7 18.1 3.2 73.6 2.66 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,wk cly lam, occ glau 4 85 13065.3 62.6 19.2 2.7 73.0 2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,wk cly lam, occ glau 1 - 11 Company : BP EXPLORATION (ALASKA), INC. Wel 1 : Pt. McINTYRE 13 CORE CORE LABORATORIES Field : POINT NcINTYRE Formation : EXPLORATION ANALYSIS RESULTS File No.: BP-3-1441 Date : 20-SEPT-91 SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 4 86 12066.2 12.1 16.3 4.2 79.9 2.66 Ss-mltgy,vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,abd wk cly lam,tr glau 4 87 13067.2 5.77 15.1 6.4 79.2 2.66 Ss-mltgy,vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,abd wk cly lam,tr glau 4 88 13068.2 10.6 16.4 5.8 77.5 2.67 Ss-mltgy,vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,abd wk cly lam, tr glau 4 89 13069.2 1.28 14.7 7.5 77.9 2.66 Ss-mltgy,vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,abd wk cly lam,tr glau 4 90 12070.2 4.28 14.7 8.2 75.2 2.68 Ss-mltgy,vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,abd wk cly lam,tr glau 4 91 13071.2 2.57 14.9 6.9 75.5 2.66 Ss-mltgy,vfgr,vwsrtd,rnd,vwcmt,qtz,wh cht,abd wk cly lam,tr glau 1 - 12 SURFACE CORE GAMMA LOG SECTION 3 CONVENTIONAL CORE ANALYSIS, STATISTICAL DATA Company Wel 1 CORE : BP EXPLORATION (ALASKA), INC. : Pt. McINTYRE 13 ANALYT I CAL PROC EDUR LABORATORIES Fi el d : PO I NT Mc I NTYRE Formation : EXPLORATION ES AND QUALITY File No.: BP-3-1441 Date : 20-SEPT-g1 ASSURANCE HANDLING & CLEANING Core Transportation Solvent Extraction Equipment Extraction Time Drying Equipment Drying Time Drying Temperature AIR FREIGHT TOULENE DEAN-STARK 24 HOURS CONVECTION OVEN 24 HOURS 240 DEGREES F. ANALYSIS Grain volume measured by Boyle's Law in a matrix cup using He Bulk volume by Archimedes Principle Water saturations by Dean Stark Oil saturations by weight difference in Dean Stark Permeabilities measured on 1.0 in. diameter drilled plugs Core Gamma Composite Dean Stark grain densities clean, dry solid mineral phase are measured Company Well : BP EXPLORATION (ALASKA), INC. : Pt. McINTYRE 13 CORE LABORATORIES Field : POINT McINTYRE Formation : EXPLORATION File No.: BP-3-1441 Date : 20-SEPT-91 TABLE I S U M !,! A R Y O F C O R E D A T A ZONE AND CUTOFF DATA ZONE: Identification EXPLORATION Top Depth 12759.0 ft Bottom Depth -- 13072.0 ft Number of Samples 310 ATA TYPE: Porosity .............. (HELIUM) Permeability (HORIZONTAL) Kair CUTOFFS: Porosity (Minimum) 0.0 % Porosity (Maximum) 100.0 % Permeability (Minimum) --- O.O00O md Permeability (Maximum) --- 100000. md Water Saturation (Maximum) 100.0 % Oil Saturation (Minimum) - 0.0 % Grain Density (Minimum) -- 2.00 gm/cc Grain Density (Maximum) -- 4.00 gm/cc Lithology Excluded NONE CHARACTERISTICS REMAINING AFTER CUTOFFS ZONE: Number of Samples Thickness Represented - POROSITY: Storage Capacity Arithmetic Average .... Minimum Maximum ............... Median ................ Standard Deviation GRAIN DENSITY: Arithmetic Average .... Minimum ............... Maximum ............... Median Standard Deviation .... 310 310.0 ft 6596 2 ~-ft 213% 38% 289% 218% +44% 2.72 gm/cc 2.64 gm/cc 3.22 gm/cc 2.68 gm/cc _+0.12 gm/cc PERMEABILITY: Flow Capacity ......... Arithmetic Average Geometric Average Harmonic Average Minimum ............... Maximum ............... Median ................ Standard Dev. (Geom) -- 82151.5 md-ft 258 99 9 i 31 0 01 1729 145 K.io_+O 833 md md md md md md md HETEROGENEITY (Permeability): Dykstra-Parsons Var. -- Lorenz Coefficient 0.781 0.499 AVERAGE SATURATIONS (Pore Volume): Oil Water 19.1% 59.9 % Stat 1 - 1 Permeability v~ Porosity iO000. ~000.0 ~00.0 ~0.0 O.i 0.0~ 0.0 Heiium PoPo~ity: ~4.0 30.0 - LESEND ~ iO0 iO0 90 70 60 ~0 20 iO 2.60 90 BO 70 ~0 40 iO 3.30 BP EXPLORATION (ALASKA), P~. HcINTYRE EXPLORATION i27~9.2 - i307i.2 'rNC, - LE6EN6 - Median Velue Arith. Average lO0 90 80 70 BO SO 40 30 EO iO 0 3~0 Porosity Histogram / lO0 9O ~0 40 30 80 iO 0 BP EXPLORATION (ALA~KA). Pt. MclNTYRE 13 EXPLORATION i275g.2 - i307i.8 Arith. AvePage [8i.3) Cumulative Capacity L~st iO0 90 70 ~0 40 -.ao ~0 :LO 0 .005 iO0 = ~.0 5793. BP EXPLORATZON (ALASKA). P~:. McZNTYA~ i3 EXPLORATION i~759.~ - i3071.~ - LEGEND - Median Value SECTION 4 TRANSMITTALS, AND DATA DISKETTE TRANSMITTALS TRANSMITTAL AND ACKNOWLEDGEMENT OF RECEIPT TO: BP CORE STORE ANCHORAGE, ALASKA ATTENTION: JOHN MA TERIALS RECEIVED VIA: CORE LAB PERSONNEL ITEMS RECEIVED: POINT MCINTYRE #13 1/3 AND 2/3 SECTIONS. POINT MCINTYRE fl13 STATE CHIPS AND PLUG ENDS Shipped by: PERRY BROWN R ecieved?~i'. ~ ~. for CORELAB for BP Date: 27-AUG-91 Date: / ? - P/ease note that the items listed above are inventoried, shipped and received in good faith, but due to errors, are subject to minor adjustments. In .~tch case both shipper and receiver agree to make a timely and bona fide effort to correct any observed discrepancies. ., . . ~.~', ~ ' ' . BOX INVENTORY COMPANY NAME: WELL NAME: CORE: TOP OF CORE DEPTH: BOTTOM CORE DEPTH: SECTION CUT: BP EXPLORATION POINT MciNTYRE #13 1,2,3,4 12759.0 13071.8 STATE C HIPS NUMBER OF BOXES: CORE# BOX# 1 1 1 2 2 1 2 2 3 1 3 2 4 1 4 2 DEPTHS 12759.0 - 12796.0 12797.0 - 12815.0 12819.0 - 12851.0 12852.0 - 12890.0 12890.0 - 12940.0 12941.0 - 12980.0 12981.0 - 13030.0 13031.0 - 13071.0 CORE# PAGE 1,2,3,4 FILE: 1441 DATE 27-AUG-91 BOX# DEPTHS . - ... BOX INVENTORY .- COMPANY NAME: WELL NAME: CORE: .- TOP OF CORE DEPTH: BOTTOM CORE DEPTH: SECTION CUT: ... NUMBER OF BOXES: BP EXPLORATION POINT MclNTYRE #13 '1,2,3,4 12759.0 13071.8 PLUG ENDS 14 CORE# BOX# 1 1 1 2 I 3 2 1 2 2 2 3 3 1 3 2 3 3 3 4 4 1 4 2 4 3 4 4 DEPTHS 12759.2 -12781.2 12781.2 - 12802.4 12803.2 - 12815.2 12819.2 - 12848.4 12849.2 - 12870.2 12871.2 - 12889.2 12890.6 - 12912.3 12913.3 - 12933.2 12934.3 - 12955.2 12956.3 - 12980.2 12981.3 - 13000.2 13001.3 - 13021.2 13022.1 - 13045.2 13046.2 - 13070.2 CORE# PAGE '1,2,3,4 FILE: 1441 DATE 27-AUG-91 BOX# DEPTHS COMPANY NAME: WELL NAME: CORE: TOP OF CORE DEPTH: BOTTOM CORE DEPTH: SECTION CUT: NUMBER OF BOXES: BOX INVENTORY BP EXPLORATION POINT MclNTYRE #13 1 12759.0 12815.5 1/3 7 PAGE 1 FILE: 1441 DATE 27-AUG-91 CORE# BOX# DEPTHS I 1 1 2 1' 3 I 4 I 5 1 6 1 7 12759.0 -12768.0 12768.0 - 12777.0 12777.0 -12785.5 12785.5 - 12793.0 12793,0 -12801,0 12801.0 -12808.4 12808.4 -128t5.5 CORE# BOX# DEPTHS COMPANY NAME: WELL NAME: CORE: TOP OF CORE DEPTH: BOTTOM CORE DEPTH: SECTION CUT: NUMBER OF BOXES: BOX INVENTORY BP EXPLORATION POINT McINTYRE #13 2 12819.0 12890.1 1/3 9 PAGE 2 FILE: 1441 DATE 27-AUG-91 CORE// BOX# DEPTHS 2 1 2 2 -~ 3 _) 4 2 5 2 6 2 7 2 8 2 9 12819.0 -12827.8 12827.8 -12836.9 12836.9 - t2846.0 12846.0 - 12855.0 12855.0 -12863.5 12863.5 -12871.4 1287t .4 - 12880.0 12880.0 - 12888.5 12888.5 -12890. t CORE# BOX# DEPTHS COMPANY NAME: WELL NAME: CORE: TOP OF CORE DEPTH: BOTTOM CORE DEPTH: SECTION CUT: NUMBER OF BOXES: BOX INVENTORY BP EXPLORATION POINT MclNTYRE #13 3 12890.0 12980.4 1/3 12 CORE# BOX# DEPTHS 3 1 3 2 3 3 3 4 3 5 3 6 3 7 8 3 9 3 10 3 11 3 12 12890.0 -12896.8 12896.8 -12905.0 12905.0 -12912.0 12912.0 -12919.5 12919.5 -12927.9 12927.9 -12936,9 12936.9 -12945.8 12945.8 -12953.0 12953.0 -12961.3 12961.3 -12969.0 12969.0 -12976.2 12976.2 -12980.4 CORE# PAGE 3 FILE: 1441 DATE 27-AUG-91 BOX# DEPTHS COMPANY NAME: WELL NAME: CORE: TOP OF CORE DEPTH: BOTTOM CORE DEPTH: SECTION CUT: NUMBER OF BOXES: BOX INVENTORY BP EXPLORATION POINT MclNTYRE #13 4 12981.0 13071.8 1/3 11 PAGE 4 FILE: 1441 DATE 27-AUG-91 CORE# BOX# DEPTHS 1 2 3 4 5 6 7 8 9 0 1 12981.0 - 12989.0 12989.0 -12997.3 12997.3 - 13004.7 13004.7 - 13012.6 13012.6 -13021.6 13021.6 - 13029.5 13029.5 -13038.0 13038.0 -13047.3 13047.3 -13056.0 13056.0 - 13064.8 13064.8 - 13071.8 CORE# BOX# DEPTHS BOX INVENTORY COMPANY NAME: WELL NAME: CORE: TOP OF CORE DEPTH: BO~-TOM CORE DEPTH: SECTION CUT: NUMBER OF BOXES: BP EXPLORATION POINT MclNTYRE//13 CORE# BOX# 1 12759.0 12815.5 2/3 22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 DEPTHS 12759.0 12761.7 12764.2 12766.5 12769.1 12771.8 12774.0 12777.0 12780.0 12783.0 12785.5 12788.0 12790.8 12793.0 12795.9 12798.6 12800.9 12803.5 12806.0 12808.6 12811.0 12813.8 12761.7 12764.2 12766.5 12769.1 12771.8 12774.0 12777.0 12780 12783.0 12785.5 12788.0 12790.8 12793.0 12795.9 12798.6 128O0.9 12803.5 12806.0 12808.6 12811.0 12813.8 12815.5 CORE# PAGE 1 FILE: 1441 DATE 27-AUG-91 BOX# DEPTHS ;2 2 2 2 2 2 2 2 2 2 2 2 2 2 BOX INVENTORY COMPANY NAME: WELL NAME: CORE: TOP OF CORE DEPTH: BOTTOM CORE DEPTH: SECTION CUT: NUMBER OF BOXES: BP EXPLORATION POINT McINTYRE #13 2 12819.0 12890.1 2]3 26 CORE# BOX# DEPTHS 12819.O 12822.0 12825.0 12827.8 12830.8 12833.7 12836.0 12839.O 12841.6 12844.4 12847.3 12849.9 12852.4 12855.3 12858.2 12861.0 12863.5 12866.4 12869.O 12871.5 12874.0 12876.8 12879.5 12882.2 12884.9 12887.7 12822.0 12825.0 12827.8 12830.8 12833.7 12836.0 12839.0 12841.6 12844.4 12847.3 12849.9 - 12852.4 - 12855.3 - 12858.2 - 12861.0 - 12863.5 - 12866.4 - 12869.0 - t2871.5 - 12874.0 - 12876.8 - 12879.5 - 12882.2 - 12884.9 - 12887.7 - 12890.1 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 CORE# PAGE 2 FILE: 1441 DATE 27-AUG-91 BOX# DEPTHS COMPANY NAME: WELL NAME: CORE: TOP OF CORE DEPTH: BOTTOM CORE DEPTH: SECTION CUT: NUMBER OF BOXES: BOX INVENTORY BP EXPLORATION POINT McINTYRE #13 3 12890.0 12980.4 2/3 36 PAGE 3 FILE: 1441 DATE 27-AUG-91 CORE# BOX# DEPTHS 3 3 3 3 3 3 3 i3 3 3 3 3 3 3 3 3 3 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3O 12890.0 -12892.0 12892.0 -12894.9 12894.9 -12896.9 12896.9 -12899.4 12899.4 -12902.2 12902.2 -12905.0 12905.0 -12907.0 12907.0 - 12909.9 12909.9 - 12912.0 12912.0 - 12914.9 12914.9 -12917.0 1291710 - 12919.6 12919.6 - 12922.5 12922.5 -12923.4 12923.4 -12927.9 12927.9 -12930.0 12930.0 -12932.7 12932.7 -12935.1 12935.1 -12937.7 12937.7 -12940.0 12940.0 -12942.9 12942.9 -12945.9 12945.9 -12947.9 12947.9 -12951.0 12951.0 - 12953.0 12953.0 - 12955.5 12955.5 - 12958.4 12958.4 -12960.6 12960.6 -12963.1 12963.1 -12965.5 CORE# BOX# 31 32 33 34 35 36 DEPTHS 12965.5 12968.0 12970.5 12972.5 12975.6 12978.7 - 12968.0 - 12970.5 - 12972.5 - 12975.6 - 12978.7 - 12980.4 COMPANY NAME: WELL NAME: CORE: TOP OF CORE DEPTH: BOTTOM CORE DEPTH: SECTION CUT: NUMBER OF BOXES: BOX INVENTORY BP EXPLORATION POINT MciNTYRE #13 4 12981.0 13071.8 2/3 36 PAGE 4 FILE: 1441 DATE 27-AUG-91 CORE# BOX# 4 1 4 2 4 3 4 4 4 5 4 6 4 7 4 8 4 9 4 10 4 11 4 12 4 13 4 14 4 15 4 16 4 17 4 18 ~4 19 4 20 4 21 4 22 4 23 4 24 4 25 26 4 27 4 28 4 29 4 30 DEPTHS 12981.0 -12984.0 12984.0 - 12986.8 12986.8 - 12989.0 12989.0 - 12991.8 12991.8 -12994.5 12994.5 - I2996.5 12996.5 - 12999.3 12999.3 - 13001.7 13001.7 - 13004.8 13004.8 - 13007.5 13007.5 -13010.0 13010.0 - 13012.7 13012.7 -13014.9 13014.9 -13017.1 13017.1 -13020.1 13020.1 -13022.7 13022.7 -13024.8 13024.8 - 13027.5 13027.5 -13030.0 13030.0 - 13033.0 13033.0 - 13035.9 13035.9 -13038.6 13038.6 - 13041.0 13041.0 - 13043.0 13043.0 - 13045.5 13045.5 - 13048.0 13048.0 - 13050.0 13050.0 - 13053.0 13053.0 -13056.0 13056.0 - 13058.0 CORE# BOX# DEPTHS 31 32 33 34 35 36 13058.0 13060.5 13063.1 13065.6 13068.5 13070.8 - 13060.5 - 13063.1 - 13065.6 - 13068.5 - 13070.8 - 13071.8 3~'udhoe Bay Drilling " ,:)ally Drilling Report.,.. AFL ,o. 730038 IRpL No. 34 b~i" 8/13/91 D"yl... Si.c~' Spud/~.t 32 / 42 Supv. Init. L. PEAK we,, " Pt. Mclntyre//13 Dep,h'(UO~rVD) PBTD 13149 I"''v'°u' Depth (MD) I,,ogree. ContractOr " Daily Cost i~,..- /,--, " et. Cost T~ Date '' Nabors 28E N/A I " Operation it 0600 Last Cig. Next Csg. Shoe Test RIG RELEASED 4 1/2 TBG.@ 12471 3000 PSI W/ 9.9 , MUD DATA" BIT DATA MUD LOG DATA DRILLING DATA , , Mud type DIESEL UBT Bit No. !Depth Depth Rot. Wt. K# P.U. g.o. Weight 6.8 PPg pH Size Mud WL PPg Wt. K# Wt. K# ,. Avg. Max. Vlacoslty aec Pm Make Formation WI. K# Wt. Trq.' PV/YP PI Type BO ged vBtm. fi.lb 011. It.lb Pump Data Geld UI Serial No Conn. gad v DepIh Ou~ Pump No. 1 2 APt W.L cc Chlorides ppm MD/TVD Trip gas Liner Size 6 6 HTHP I00 pal cc OII % Footage Max. BGG v BPM HTHP 500 pal cc OWR ADT/AST DC Exponent .. RPM GPM Solida % ES Table/Mir Shale density WOB Prellure Sand % _GS % Min./Max Est. pore prell. Siow Pump Data Hole Vol. 190 bbl. Pit Vol. 0 bbl. Jeta/l'FA ROPIShala fph Slow P.S. D,,y U,d $ 0 rot,~ a,d $ 154763 a~t Co,t ROPISand Iph Slow P.P. <~..,-,., ~OOHRS 7/~/~ °'"" 111 III 2300 ERS Surv. No. Depth (MD) Angle ,,, IDIrectlon T.V.D. Vert. Sec. ,,. North/South East/West Dog Leg ,, Accident? (Y/N) N IName N/A IEmpl°yer N/A j RpI. Filed? (Y/N)N/A Time Hours Code Operations From 0600 - 0600 ..... 0600-0700 1 21 RIG DOWN OTIS + TORQUE TURN, CLEAR RIG FLOOR , ,, 0700-1000 3 14 :",N / D BOPE 1000-1500 5 22 N / U TREE, TEST PACKOFF @ 5000 PSI, TEST TREE @ 5000 PSI, REMOVE ...... 2 - WAY CHECK 1500-1830 3.5 G blSPLACE -I-BG. W / DIESEL + 140 BBLS TO FRZ. PROT. ANNULUS, 1830- 2200 3.5 E 'DROP BALL, PRESS UP ON TBG. TO 4000 PSI + SET PKR., BLEED PRESS TO 0 PSI, PRESS TBG AGAIN TO 3500 PSI F/ 15MIN-OK, TEST TBG X95/8 ANNULUS TO 2500 PSI FOR 30 MIN- OK, SET 2-WAY CHECK, N/D SWAB VALVE, SECURE TREE, L2 ,2,00-2300 1 F FRZ. PROT. PT. MC. # 9 ANNULUS W / 220 BBLS DIES~;.,SUCK OUT CELLER + ^ OUN ¥^N S + N F ! V r: n ' - w ...... RELEASE RIG @ 2300 HRS JAN 31 ]992 OiJ & Gas Cons. Commissio. L;HA D,'. J~;r~Dlio n: ,, BHA No.: Drillpipe Data (Top To BOttom) OD Weight Grade Connection Class " Leng!h BHA Length: :)ate L~.il Inspected: .... 7/g/gl , , Hours on Jars: , , InJe~:tion Data Fuel & Water ,. ,.i.c,ion We,,: Pt. Mclntyre# ....~ 16637 1443 '~o...~: 28E v.~.~.:~ 80 ~x~ F~.~.: JUNK H20 ¢~'.~ n.~.l..d 1000 F..I ,o..., BPX D~i. Water On Loc.don D~'['. Water U~ed ~SE 2~0 DIESEL Drl. Waler Received Drl: Water Source 110 PUT ~7 PIT P~'table Water On LOcalion~0i~ble Water une~ ' Daily Volume: OUmulatlve Volume: Potable Water Received P~iabi· water source Outling Data Weather Data Personnel Safety/BOP Data . Daily: 0 Temperature ~ PB DRLG I Lant BOPE Tent Last BOP Drill B/~/g 1 8/2/g 1 Cumulative Wind speed Contractor Last H2t Drill Last Fire Drill ~08 ~ KNOT5 ~ 7/~1/gl 7/~]/S] Storage Site: Chill Factor G.rvlce La.t Safety Mtg Latt Spill Drill L1 HE~. PIT 8/]2/~] 8/1 ]/~1 Well Name Date: Other Spill (Y/H) Volume (Gall.) Pt,Moln~re ~1~ 8/1~/~ 1 N N/A Signed: Total Type Spill Report Filed7 LES PEAK ~7 N/A N/A Time Houri Code Operations From 0600 To 0600 2~00-0~00 7 1 ~IG ~WN FO~ MOVE TO STAGING A~EA , ,, ,,, , ,, ,, ,,, ,,,'PrU'dhOe Bay Drilling , Daily Drilling Report w.,, Pt. Mclntyre #13 Oep, h (MOrrVD) PBTD 13149 ipre'''°u' O.p,h ,MD) IProgrees Contractor Daily Co"* Ic.,,m C.,~i Est. Cost To Date Nabors 28E N/A Operation at 0600 L,;st Cag. Next Csg. Shoe Teat LAND TBG HGR 7" LINER @ 13230' 4 1/2 TBG. @ 12471' 12.4 EMW MUD DATA BIT DATA MUD LOG DATA DRILLING DATA , ,,, Mud type BRINE MBT Bit No. Depth Depth RoL Wt. K# P.U. S.O. Weight 9.9 PPg pH Size Mud Wt. ppg Wt. K# Wt. K# Avg. Max. Viscoaity aec Pm Make Formation Wt. K# Wt. K# Trq. Trq. PV/YP PI Type BG gas v Btm. It.lb OII. It.lb Pump Data Gela MI Serial No. Conn. gaa v Depth Oul Pump No. 1 2 APl W.I- cc Chloridea ppm MDITVD Trip gaa v Liner Size 6 6 HTHP 100 pal cc Oil % Footage Max. BGG v BPM HTHP 500 pal ©c OWR ADTIAST DC Exponent RPM GPM Solids % ES TablelMtr Shale density WeB Pressure Sand % LG8 % Min./Max, Est. pore press. Slow Pump Data Hole VoL 850 bbl. Pit VoL130bbl. Jets/TFA BOP/Shale fph Slow P.S. Da,y Mud $ 0 Tot,~ Mud $ 154763 ,it Co,t BOP/Sand fph S,ow P.P. Rig Accept Dull I ! I I I I Rig Release (hr,/d,te) 1400HRS 7/11/91 G,,de !11 III Surv. No. Depth (MD) Angle Direction T.V.D. Vert. Sec. , North/South East/West ... Dog Leg Accid'ent? (YIN) N I'Name N/A IEmpl°yer N/A IRpt' Filed? (YIN) N/A , Time Houre Code Operations From 0600 - 0600 0600-0630 .5 6 ~ L/D 43/4 DC'S 0630-0800 1.5 11 'tR/U SCHLUMBERGER ,, 0800-1100 3 11 W/L RUN #1, CET,CBT, GR, CCL , 1100-1600 5 11 W/L RUN #2, GYRO 1600-1630 .5 11 IRIG DOWN SCHLUMBERGER 1630-1700 .5 21 PULL WEAR RING 1700-0130 8.5 B RIH W/ 4 1/2 TBG,PKR., 6 - GLM'S 0130-0200 .5 B P/U SSSV, TEST CONTROL LINES TO 5000 PSI, 15 MIN , 0200-0430 2:5 B RIH W/4 1/2 TBG. 0430-0600 1.5 B P/IJ + M/U TBG. HGR., TEST CONTROL + BALANCE LINES TO 5000 PSI, LAND TBG. HGR., RILDS $cription: ' , BHA No.: Drillpipe Data (Top To Bottom) OD Weight Grade Connection Claes Length BHA Length: Date Laat Inapected: 7/S/91 Houra on Jars: Injection Data Fuel & Water Injection Well: Pt. Molntyre ~ 9 IRate: 3 BPM IPreasure: 500 PSI Fuel On Location Fuel 16637 1443 Source: 28E Volume: 600 ~y~, Fluid: MUD F,,,~ Received 1000 F,,o~ source BPX Drl. Water On Location ;Drl. Water Uaed Drl. Water Received 'Drl. Water Source 110 PUT #27 PIT Potable Water On Location Potable Water Uaed Daily Volume: :umulative Volume: Potable Water Received Potable Water Source 600 8225 220 MCC Cutting Data Weather Data Personnel ~afety/BOP Data Daily:63 Temperature34 PB DRLG 1 Laat BOPE Teat Last BOP Drill 8/3/91 8/2/91 Cumulative i Wind Speed Contractor Laat H2a Drill Laat Fire Drill 2608 10 KNOTS 34 7/31/91 7/31/91 Sto~age Site: Chill Factor Service Laal ~afety Mag Laat Spill Drill L1 RES. PIT 18 6 8/10/91 8/11/91 Well Name Date: other Spill (Y/N) Volume (Gals.) Pt,Mclntyre #13 8/12/91 1 - BP N N/A Signed: Total Type Spill Report Filed? LES PEAK 42 N/A N/A Time Houra Code Operations From 0600 To 0600 BKB TO GROUND LEVEL = 35 FT. BKB TO SS = 39 FT. , "Prudl~oe Bay Drilling ~ Daily Drilling Report 8/11/91 Day. si.ce Sp.a,E,t 29/36 L. PEAK w;'fi .......... Pt. McJntyre #13 D,p,h (uorrvD) PBTD 13149'!P''v'°u' IP'°"'''' DePth' (MD) I 'Contractor ~Daily Cost ICum. Cost ..... lEal. Cost To Date Nabors 28E N/A 'Operelio~' at'0600 .... Lilt c,~. ' Neat'Cig. Isho, Teat LDDP 13 3/8 @ 3149 9 5/8 @ 12754I 12.4 EMW ' ' MUD DATA ........ ~'DAT,~ ......... MUD LOG'DATA dRILLING DATA RoL Mud ~yp. BRINE MaT mt No. n,pt, U,pth wt. Kit ............................ P.U; .... S.O. ' ...... Weight 9.9 Ppg pH Size Mud WI. ppg Wt. K# WI. Kit Avg. Vt~coalty aec Pm Make Formation Wt. Kit Wt. Kit ............. Tr~l. Trq. PVIYP PI Type SG gaa vBtm. fi.lb OII. fi. lb. Pump Data Gala MI Serial No, Conn. gal v ' ' Pump No. 1 2 ,, , . . Depth OM1 APl W.L cc Chloridet ppmMDITVD Trip gal v HTHP 100 psi ccOii F ct ge Max. BGG v ....... BPM HTHP 500 pat cc OWR ADTIAST DC Exponent ..... RP~4 ............ GPM Solide % ES Table/Mir Shale density .... ~0'B' 3rea,ur, Sand % LGS % Min./Max Esl. pore pres.. Slow pump Data ,el, vol 850 bbl. Pit Vo~. 130 bbl. Jeta/rFA ReP/Shale fph Slow P.S. ..... o.,y Mu, $ 695 Tot-, U-d $ 154763 S, Co,t I,OP/S,nd fp. Slow P.P. 400HRS! ....... .!.11 ill ................... , , rsurv. No. , , Depth (MD) Angle Direction T.V.D. ,, ,, , ,,, , , ,,, , ...... Vert. Sec. North/South East/West Dog Leg ,, , ..... ,, , ,,, ....... I " ....... I I Zc~d'"t? (YIN) N i~,m. N/A Em'pl;yer / N/A Time Houra Codo Operations From 0600 . 0600 o oo-0. o 0830'09~0 ....... 1 .... ~' Di~i~L RING OUTOF LINER HGR. @ 12428. ' .......... 0930-1000 .5 6 RIH 1000-1400 4 2 DRILL CMT. AND LANDING COLLAR F/ 13038' TO FLT. COLLAR @ 13149' ,, , , , , ,, , 1400-1530 1.5 5 CIR~.'HIGH vISC. AROOND . 1530-1600 I E TEST LINER LAP AND SHOE TO 3000 PSI F/ 30 MIN. - OK 1600-1930 3.5 5 DISPLACE HOLE TO BRINE. PUMPED 380 BBLS H20, 120 BBLS DIRT-MAG, AND .,, , , , , ..... , 1300 BBLS OF BRINE. UNTIL BRINE CLEANED UP TO LESS THAN 100 MG/LITER , , , . ,., , .,, , SOLIDS 1930-2000 .5 E TEST LINER AGAIN W/BRINE, 3000 PSI, 20 MIN, - OK ,, ,,, .., , 2000-0430 8.5 6 LD 5" DP · ~', Pr~Udhoe Bay Drilling ,,-----.~ ~-'" Daily Drilling Report AF'= No. 730038 "'i,C'~o. 3 t 8/10/91 29/34 L.P. .... w.,, Pt. Mclntyre #13 De.,. (UDrrVD) 13250 / 9384 ]P,evio,,. Dep,h (.D) 13250 !~',°g'e'' TD ContraClor Daily Cosl ICum. C~ Est. Cosl T~' Dat~ Nabors 28E N/A Operation It 0600 Li~t Csg. Next Cs~. Shoe Te~t RIH 7"~ 13230 4 1/2 TBG. NONE MUD DATA ~T DATA" MUD LOG DATA DRILLING DATA ...... , . ,, ..... Rot. u.~ ~,. CORE FL. ua~ 14 a, .o. ~*"~ ~'"~" w,. 210 " P.U. G.O. w.~,,~ 10.0 ,,, "" 11.3 si,. 6 1/8 8 1/2 u., w~. ,,, w~. 355 K~ w,. 150 Avg. Max. v,.~..,~ 54 "~ "' 2.7 u.~. STC STC ~o,..,o. w~. ~ w~. trq. Trq. .w~ 16/13 P~ .75 ~"' FDTC FDT .~ ,.. . .~.. ~ '.~". ~'~' 5/17/22 u~ 2.2 s...~ .o. KR9757 NB1831 co... gas V Pump '' ' Depth Oul Pump No. 1 2 ~. W.L. 5.7 '" c,~.,~,.. 6700 ,,~ MDITVD Trip ga, v " Liner Size ~ HTHP 100 p=i cc Oil .1 ~ % Footage Max. BGG v ,,, ~"" 60 60 "' ... ~"" 254 254 s.,~. 9.5 ~ ~s ;.b~.~,, 80 S,.~. ' ' ""'"'* 2100 PSI woe s.., .125 ~ ~s 4.0 ~ .~..~u.., 0/10 E.,. ,~,..,,... S,....~. D.~. , , ..~. vo~. 815 ""~;"" w~. 375 ""~' ,,~.n~A OPEN 3-28'S ,o,~s,.~, ~,, s~o. ,.s. 35 ...... ..,,, ..d; 1353 ;o~.~ Mud $154069 ., c..~ $1904 .o,/s.., ~,h S~o. ,... 425 .,.'--.. ...... .u,, I I I I I I "'. ("'"""') 1400HRS """ II !,, II,I" N/A , , Surv. No, Depth Angle Dlr~clion , , Ve~. No~h/~outh East/West Dog Leg Accident,(V/N) N iN.me N/A IEmPlOyer N/A IRp.' Filed? (Y/N) N/A Time Houra Code t Operattona From 0600 - 0600 0600-0900 3 6 RIH 0900-1000 I 1 9 '.SPACE OUT, WASH TO FISH, SCREW INTO FISH, ROTATE TO RELEASE RUNNING , , . ........... T~L, PULL FREE (55K OVER PU ~. ) ,. 1000-1500 5 6 P~H, ~D FISH ., , ,. ,,, . 1500-1530 .5 6 P/U BIT, C/O BHA , . ~, ,. 1530-1900 3.5 6 RIHTO 12166' ..... 1900-2030 1.5 3 WASH + REAM F/ 12166' TO LINER TOP ~ 12421' , , ............. 2030-2200 1.5 5 CIRC. HIGH VISC. SWEEP AROUND .......... 2200-2300 I E TEST 7" LINER ~AP + CSG. T~ 3000 PSI FOR 30 MIN. - OK ( LOST 125 PSI IN 30 MIN 2300-0330 4.5 6 P~H, ~D H~ DP + 6 1/4 DC'S ,, . 0330-0400 .5 6 R/U FOR SMALLER BHA , ,, .... BHA Description: BIT, BIT SUB, 10- 4 3/4 DG'~, 15- 3 1/2 HWT DP, BHA No.: Drillpipe Data (Top To Bottom) 1 7 O D Weight Grade Connectio,,n Class Lensth BHA Length: 804.47 5 22.5 S-135 4 1/2 IF PREM 3796 Date Last Inspected: 07/09/91 5 21.9 G-105 4 1/2 IF PREM 7249 HoUrs on Jars: , Injection Dali Fuel & Water ~nject~o. We,: Pt. Mclntyre # 9 iRste: 3 BPM IPressure: 550 '650 Fue, On Loca,,o" Fue, U.ed 19396 2537 Source: 28E vo,ume: 150 Ty~ Fluid: H20 ru°i ne.eivod 0 r.e~ Sou,ca BPX Drl. Water On Location Drl. Water USed 28E 25 DIESEL Dri. Water Received Drl. Water Source 210 PUT #27 PiT 'Potable Water On Locslion 3otable Water Us'ed Daily Volume: CUmulative Volume: Potable Water Received Potable Water Sourc· 175 6405 110 MCC ,, Cutting Data Weather Data Personnel Safety/BOP Data Daily: 7 Temperature38 PB DRLG ! Last BOPE Test Lall BOP Drill 813191 812/91 Cumulative Wind SPeed Contraclor Last H2a Drill Last Fire Drill 2512 5 KNOTS 30 ~i~31/91 ~/31/91 Storage Site: Chill Factor Service Last Safely Ig Last Spill Dr L-1 RES. PIT 32 817191 813191 Well Name Date: Other SPill (Y/N) Volume (Gala.) Pt,Mclntyre #13 8/10/91 8 N N/A Signed Report Filed? ; : Total Type Spill LES PEAK 39 N/A N/A Time Hours code Operations FrOm 0600 To 0600 0400-0500 1 6 P/U 4 3/4 COLLARS , 3 1/2 HWT DP + 6 1/8 BIT 0500-0600 1 6 -. Pr[. ,dhoe Bay Drilling ,-,. .-- Daily Drilling Report ^F,= .o. 730038 IRpi..o. 3L D,t. 8/9/91 Daye Si.ce Sp.d~E, 28/33 S,,pv. ,... L.P. we, Pt. Mclntyre #13 D,,,h (U~Vm 13250/9384 ~,,.v~o~, D~,,h (U~) 13250 ~,,o~,,, TD Conlractor Daily Co~l ' ICum. Cosl E~t. C'o'=i To Date Nabors 28E N/A Operation at 0600 Last Cig. Next Csg. ~ghoe Teat C~ DRLG LINE 7"~ 13230 4 1/2 TBG. NONE MUD DATA ~T DATA MUD LOG DATA DRILLING' DATA '' ...... ..d~,, COREFL. MaT 14.5 a~.o. 83/8OD ~.,~ ~.,~ 12417 w~. 210 .... P.U. S'.'O. w.lg~ 10.0 ,,~ "~ 11.15 si=. 67/81D ~.dw~. ,,. w~. 345 ~' w~. 130 ..... Avg. Mix. v~..o..~ 58 '" P' 2.4 u.~. TRI ST. ~o,~.,~o. w,. K~ w~. .......... ~Trq. Trq. ,v~, 17/14 "~ .65 ;~"' SHOE a~ ,., , m=. 22-27 '-~" o,. 22K ., .... G.I. 6/18/23 u~ 2.0 Serial No Conn. gu, v ~ump De~f Depth Ou Pump No. I 2 ~, W.L 4.9 '" Ch~o,~,., 6800 ,,~ Um~V~ 12417 T,~. ,.. .... Liner Size 6 6 HTHP 100 psi cc O11.33% Footage Max. BGG v . . aP" 90 HTHP ~00 p,I cc OWR .33/90.0 ADTIAST DC Exponenl RPM GPM 381 so.d, 9.5 % ES T.~.~U. 60 Sh~. .... , . . ,,...u,. 1700 PSI WOB S,,d .33 % LG8 4.0 % ~Min./M,x 10-20 Ell. pot, pr, l~. Slow Pump D~I~ ii ii i i i i Hol, Vol. 813 bbl Pit Vol. 430 bbl. J~I~FA ROP/Shil, fph Slow P.S. 35 ........ D,ily Mud ~ 500 Tot,I Mud S 15271~ ~811Co~l ROP/Sond Iph Slow P.P. 425 ..... i .,o.-., III I!1 .,0 ,h,.,.,., 00HRS I1, I Iii ..... A~gl~ V~. ~c. Dog L~g . . . , Accidenl~ (Y/N) N IName N/A IEmpl°yer N/A I npt' Filed? (Y/N) N/A Tirol Houri Code Operations From 0600 - 0600 0600-0630 .5 6 ~ D 6 1/4 DC'S OUT OF DERRICK  ...... 0~30-1500 8.5 6 ?~ CRIPPLED MILL, 236'OFWASH PIPE, 9-63/4SD0'S AND RIHTO 12,200' 1500-2100 6 19 P/UKELLY AND WASH OVER FISH ( DP) F/12219' TO12288', TAGGED CMT. .... MILL C~. F/ 122~' TO 12417' ( BTM OF LINER HGR. SE~ING T~L ) , , , 2100- 2230 1.5 5 ~IRC HI~H VISC. SWEEP AROUND ..... , ,, 2230-0300 4.5 6 POOH ,, 0300-0400 I 6 ~D WASHPIPE 0400-0500 I 6 P/U 5' PUP AND RIH TO SCREW INTO FISH ~ 12219' ...... 0500-0600 I 9 CUT AND SLIP DRLG. LINE , , ,, BHA Daacrlptlon: ~ ~'~ (BHA # 1) CRIPPLE tOTARY SHOE, 8 ,ITS. WASH PIPE, TOP 1~,..,,5HING, BUMPER JARS, OIL JARS, ........ , X~), 9 - SDC'S, X~:3, 21 JTS. HWT DP ( BHA #2 ) PUP JT, B-JARS, OIL JARS, X-O, 9-SDC'S,X-O, 21-JTS HWT DP BHA No.: Drlllplpe Dat., (Top To Bottom) 14 / 15 " OD Weight Grade ....... Connection Claes Length ...... , .,, ,. ,., , BHA Length: 1174 / 935 5 22.5 S-135 4 1/2 IF PREM 3796 Oaia LIar In'peeled: 07/09/91 5 21.9 G-105 4 1/2 IF PREM 7249 Houre on Jars: ...... , InJeclion Data Fuel & Water Injection Well: Pt. Mclntyre # 9 I~te~ ipreaeura: Fuel On Location Fuel U.ed 21933 2166 ...... Source: Volume: 0 Type FLuid: Fuel Received 10001 Fuel Sourc. BPX Drl. Water On Location Drl. Water Uaed Drl. Water Received Drl. Water Source 21 0 PUT #27 PIT Potable Waler On Location )olable Water" Uied Daily Volume: Cumulative Volume: Polable Water Received Potable Water Source 0 623,O 11 0 UCC Culling D.,la' Weather Dale Peraonnel Safety/SOP Data ..... ;Daily: 0 Temperalure PB DRLG 1 Last BOPE TestLast BOP Drill 8/3/91 8/2191 Cumulative Wind Speed Contractor Last H2a Drill L.,st Fire Drill 2505 30 7/31/91 7/31/91 Storage Site: Chill Factor I Service Laat Safety MIs Last Spill Drill L-1 RES. PIT 7 8/7/91 8/3/91 w,, .,m, Pt,Mclntyre 813 D,to: 8/9/91 Other Spill (Y/N) Volume (Gale.) N N/A Signed: Tol.,I Type Spill IReport Filed? .... LES PEAK 38 N/A N/A , ..... . .., , Time Hour., Coda Operatlona From 0600 To 0600 I BP Exploration ,"'-', '"'" Daily Drilling Report w,,I PT. MclNTYRE #13 D,pth (MDrrVD) 13250/9384' iPr'viDe' Depth (MD) 13250 IP'~gr°'a TD Con'tracior ................. Daily Cell .... ,~,,,~ r,,-', 'Iaea'. Coat To'Data NABORS 28 E N/A Operation It 0600 Last 'Cog: Next"Ceg:IshoaTest POOH 7"@ 13230 4 1/2 TBG.! NONE MUD DATA BIT DATA" MUD LOG"DATA " 'DRIL'LING DATA ................ :IOL' Mad typo CORE FL. MaT 15.5 Bit No. Depth Depth Wt. K# ppgl P.U. a.D. weight 10.0 pH 8.75 Si,e UudWL ppg Wt. 280 Kid Wt. 140 Kid Avg. Max~ Viecoait¥ 54 aec Pm .60 Make Formation WI. Kid Wt. Kid .............. T'rq. , Trq. PV/YP 16/13 PI .20 Type DG ga, v Btm. It.lb. Oil. It.lb ............... Pum? Data ..... o,la 3/11/19 M, 1.90 Seri.t Ho. r co,n. gao .... Depth Dui........ Pump No. 1 2 An W.L. 4.3 co Chlorides 7000 ppm MD/TVD Trip gan v .............. Liner Size HTHP 100 pal cc Oil .5 %Footage M~x. BGG v ..... BPM HTHP 500 psi co OWR .5/90.0 ADT/AST DC Exponenl RPM GPM Solida9.5% ES Table/Mir Shale density ........ ..... Preaaura web s,,d .125 ~' LGS 4.21 % Min./Max, Eat. pore prec,. Slow Pump Ho,. VD,. 941 bbl Pit VoL 450 bbl. JetafI'FA ReP/Shale Iph Slow ... D,Ily Mud $ 700 ;ot,I M,d $ 152216 Sit Co,t ,OP/Sa,d Iph Slow P.P. 7/1 / 1 400HRS III !11 N/A ....... ,... , , Surv. No. Depth (MD) Angle .. Direction T,V.D. , , Vert. Sec. ,, , ..... ,,, North/South Eaat/Weat Dog Lag Time Houra Code Operatlone From 0600 - 0600 0600-0700 1 15 'i '~ CHANGE TOP RAMS, R/D CMT HEAD =., 0700~0900 2' 21 'WALTON ATLAS WL · 0900-1200 3 1 9 R/U ATLAS, W/O APRS · . . · 1200:1830 6.5 19 R/U FREE PT. LOCATOR, RIH, FIND FREE PT. @ 12162' _ 1830-2030 2 1 9 POOH W/LOCATOR, R/U STRING SHOT CHARGE, RIH W/ WL 2030-2130 1 1 9 WORK 8 WRAPS OF REVERSE TORQUE INTO STRING 2130-2200 .5 1 9 LOCATE TOOL JT. FIRE STRING SHOT, BACKED OFF DRILL STRING, PU Wt. 280K , ......... 2200-2330 I 19- POOHW/WL, R/D ATLAS ,, , ,, ,,, 2330-0030 I 5 CBU ......... 0030-0530 5 6 POOH, CK EVERY CONNECTION FOR TORQUE AFTER BACKOFF, PULLED ....... 12,219' OF DP OUT OF HOLE .... BHA No.: Drlllpipe Data (Top To Bottom) O., .a. Weight ' GtC. d;.. ' ' Conn'ecllon Cl.el... Length.,. BHA'"Length: 5 22.5 S-135 41/2 IF PREM 4970 ....... D,t, L,,t I,ep, ct,d: 5 21.9 G-105 4 1/2 IF PREM 7249 Houra on Jara: , "'"' Injection Data Fu~l & Water injec'ilo,'w,,: PM'//9 IR't': 3 BPM IPr'a'Ur': 650 PSI Fu.I On Location F~;l"Ua'e'~ . 14098 2284 Sourc,: 28E Vo.um.: 225 T~, F.u~d: JUNK H20 Fu,I R.,:e~v.,~ 0 F~',l "s,;~,,c. BPX Drl. Water On Location Drl, Water Used 28E 25 DIESEL , , Drl. Water Received Dr'i. WaJ'~r S~'~'rce 220 PUT #27 PiT ...... Polable W,;ter On Location :~otable Wst~r'lLJaed Daily Volume: ..... ~umulatlve Volume: Potable'W~ter Received Po'Jable Weter"~ourc~ 110 .... MCC "Culling Dali Weather Data Personnel Sal'ety/BOP Data Daily: 0 Temperature 37 ~"D t Leal BOPE TeSl Lael BOP Drill 8/3/91 8/2/91 ,. C~'~"ulativ~l Wind ~peed Contractor Laet H2~ D'dll Leal Fire Drill 2505 10 30 7/31/91 7/31/91 Sto~:;,ge Site: C~ill Factor .... g'~rvlce LaSt 9alety'JVlrt~' Lair 8pill Drill L-1 RES PIT 23 8 8/7/91 8/3/91 W~i[ Name Date: Other Spill (Y/N) Volume (Gal-,.) PM # 13 8/8/91 N N/A Si~]~ed: T~Ial ' T~pe Spill Report Filed'/ LES PEAK 39 N/A N/A ,, ,, Time Houri Coda Operatione From 0600 To 0600 0530-0600 .5 6 RAJ TO PiCK UP WASHOVER PiPE ,, ..... -- ,, ,, ,,, ..... ...... Pru'dhoe Bay Drilling Daily Drilling Report We,, Pt. Mclntyre #13 Oep, h (UDrrVD) 13250/9384 I"re''°u' Depth (aD)' 13250 I"'°"'eM' TD :Contractor 'Dally Coat Cum, Cost ;Est. Coat T~'"Data NABORS 28E ~ N/A Operalion al 0600 Last Cog. Nexl Cog. Shoe Test STUCK 7" @13248 4 1/2 TBG. MUD"DATA "' BIT DATA MUD LOG DATA DRILLING DATA u,,~ typ. CORE FL. U.T 16.0 o, No. ~ D,pt, D,pth W,. " P'.U. S'.'O. Weight 10.1+ PPg pH 8.55 81za Mud Wt. ppgl Wi. K# Wt. K# ..... Avg. Max. v~.co.,v 57 o,o Pm .45 U.k. rorm..on W.. K# Wt. ..... Trq. Trq. PV/VP 19/14 m .20 gyp. aG g,. , atm. ,.,b. O,. Gel, 5/13/22 M, 1.95 ser~,~ No, ce.ri, gaa ~ .~...,r.., ~',at.. ...... Depth OUl Pump No. 1 2 APl W.L 3.9 cc Chlo,i,~e. 7100 ppm MDITVD Trip gaa v Liner Size HTHP t00 pal cc OII .5 % Footage Max. BGG v BPM HTHP 500 pal cc OW. .5/89.5 ADT/AST DC Exponenl , , RPM GPM Solida 1 0 % ES Tabls/Mtr Shale densily ' " WC~B Pressure S,,d .125 % LGS 4.45 % UI,,U,. E,t. po,. pro,,. Slow P,,mp Ds,, Ho,, vol. 941 bb~ Pit Vol. 450 bbl. JoIa/TFA ROPIShale Iph Slow P.S. ~,i,v u., $ 3157 Tot,I Mud, 151516 Sit Coat ,OP/S,,, fph Slow P.P. , 0Acc,t D.. I I I I I I.. ,I,,.lee. ,<h,e/d,t,) 1400 HRS 7/11/91 G,,d, I I ,,i I,, I I Surv. No. Deplh (MD) Angle Direcllon T.V.D. Va~1. Sac. No~lh/Soulh , , Eaat/West Dog Leg Accident? (YIN) Time Houra Code Operaliona From 0600 - 0600 0600-1130 5.5 I 1 !~W/L GUAGE RING, JUNK BSKT. RETRIEVED NO JUNK 1130-1200 .5 1 I !.R/D SCHLUMBERGER , , , 1200-1300, 1 15 CNG.TOP RAMS TO 7",PULL WEAR RING, SET TEST PLUG, TEST DOORS, PULL PLUG, SET WEAR RING ,,, ,, , , , 1300-1500 2 12 A/U CSG TOOLS, P/U 7" LINER, P/U LINER HGR + CIRC. LINER VOL 1500-2230 7.5 6 RIH W/LINER FILLING EVERY 12 STDS. ,, 2230-2300 .5 5 CIRC. PIPE VOL. @12565', 8BPM,1150 PSI ,,, , , 2300--2400 1 6 RIH,TAG BTM @ 13250' ...... 0001-0230 2.5 5 CIRC + COND. MUD F/ 7" LINER ,, 0230-0330 1 12 TEST CMT LINES, PUMP 20BBL PRE FLUSH, 40BBL SPACER,49BBLS.CMT. 0330-0500 1.5 12 SET LINER HGR. ROTATE TO RELEASE, COULD NOT RELEASE , CMT.SET UP ,,, , ...... , , . . - BHA No.: Drillpipo Dsta (Top To Bottom) o~ W.ight Or'd'. Co.nect~on Cl,,. L~n~th ...... , BHA Length: ., Date Laat Inapecled: !Houri on Jarl: Injection Data F-el & Waler !Injection Well: PT.MC. 9 IR,te: "' IPre..ur.: Fuel On Locallon '' Fu.I Ulod 16382 1921 ~Source: Volume: 0 Ty~ Fluid: Fuel Received 0 Fuel Source BPX , , ,, ,, Dd. Water On Localion Drl. Waler Used , ...... Drl. Waler Received Drl. Waler Source 440 PUT ~27 PiT , , , Polable Waler On Location )otablo Waler Used Daily Volume: CumulalJve Volume: Potable Water Received Polable Water Source 0 ,, 59~0 110 MOC Culling Dala W~alh~r Dal'a P~r~onn~l SaletylBOP Dala ..... D~lly: 0 Temperature 38 PBD 1 L~sl BOPE Tesl L~t BOP Drill 8/3/91 8/2/91 Cumulaliv~ Win~ ~pee~ Centractor Last H2s Drill L~I Fire Drill 2505 YDS 10 KNOTS 30 7/31/91 7/31/91 Storage Site: Chill Factor So'vice Last Safety Mtg Last Spill Drill 24 9 8/6/~1 8/3/~1 Well' Name Date: Other Spill (Y/H) Velum. (Gala.) Pt. MclnWre g13 8/7/91 N N/A Signed: Total Type Spill ~Report Filed? LES PEAK 40 N/A N/A .... TIm~ Hour~ Code Operation~ From 0600 To 0600 ,,, 0500-0600 1 CALL APR , TRI STATE, CHANGE TOP RAMS TO VARIABLE i,. ,, , , ' Prudhoe Bay Driiling, --- --' Daily Drilling Report'- · ' -- ID.,. ID'Y' S'nce ^Fi .*. 730038 ~, 08/06/91 25/33 Z. RUNJE ,,, Well PL Mcln~re~13 Depth (aD'VD, 13250,9384 IPrevi°u, Depih (MD) 13250 Ip'°~'''' TD Contractor Daily C~st ~"- ~-~ Est. Cost To Date Nabom 28E N/A Operation at 0600 L~=t Csg. Next Csg.' Shoe Test RIH W/GRIN~JUNK BASKET/CCL 9 5/8 ~ 12737 7 ~ 13250 F.I.T. 1~ EMW MUD DAYA ~T DATA MUD LOG DATA DRILLING "D~TA ............ RoL a~d typ, CORE FL. ~s; 15.5 a,,o. 10 D.p~h Doplh WI. KJ P.U: S.C. Weight 10.1+ ppg pH 7.9 Sl,e 8.5 Mud WL PPg Wt. , , Avg. w.oo.,v 74 "~ "= .40 ~'~' STC Eo.~.,o. w,. ..... T'rq. '" Trq. ,v/~. 20/24 P~ .15 tv,. FDT aG g., v a~. .... Pump Dali G,~. 6/21/36 ~ 1.85 ,s.,l'~ .~ NB1831 c~.. ~.. ~ ..... , , .... Depth oU~ Pump No. t 2 AR W.L 3.8 cc Chleride, 7200 .~- aD~tvD WIPER t,~, ~, Liner Size ,tH, ~oo ,,J N/A ~' o, .5 ~ Foo~.,. RUN a... a~ .~.P ~o0 p.~ N/A "own .5/89.5 ADTIAST _ DC Exponent RPM GPM so,., 10.0 ~ Es N/A Table/Mtr - Shale density ......... WOB E~I. po~e press. '' is.,, TR ~ Lo8 4.3 ~ Min./Ma=. - Slow Pump Data Hole VoL 872 bbl Pit VoL 400 bbl. Jels~FA 3-28 ReP/Shale Iph Slow P.S. ,.., , , Daily Mud $ 2004 Total Mud S 1 4835~ Bit Cost N/C ReP/Sand Iph Slow P.P. (,..,..,., 0OHRS III III N/A .... Suer. No. Depth (MD) ..... Angle Direction T.V.D. Ve~. Sec. No,h/South East/West Dog Leg ~ .... Accident, (YIN) N iName N/A 1Empl°yer N/A I RpI. ........ Time Hou~ Codo Oporallons F~om 0600 - 0600 0600-0800 2 1 T~,. CONTINUED WITH LOGGING RUN ~2 (DENSITY,NEUTRON,SPECTRAL GAMMA RAY, !~ CALIPER,MICROLOG). POOH. ,, , 0800-1400 6 1 1 R/U T~LS FOR LOGGING RUN ~3. (R~ FOR PRESSURE GRADIENTS). RIH. ,, .... , ........ OBTAINED MOST OF THE DATA .WAS DIFFERENTIALLY STUCK ~ 12819'. ~ PULLED 2000 OVER PUW OF 5800 BUT WELL WITHIN SAFE OVERPULL BEFORE PULLING OUT OF ROPE SOCKET. PULLED OUT OF HOLE. ...... 1400-1430 2 1 1 ~D SCHLUMBERGER. , , , ........ 1430-1530 1 6 M/U WIPER BHA AND RIH TO 2650'. , ,, , ........ 1530-1630 1 6 CUT AND SLIPED 104' OF DRILLING LINE. .... , ,,,, ,, ,,, , , ..... 1630-1930 3 6 CONTINED TO RIH . WASHED 60' TO BOSOM. FOUND 1' OF FILL. ........ 1930-2100 1.5 CIRCULATED 60 BBLS OF SWEEP AT 150 SPM AT 300 PSI. ,,, BHA//13 FOR wIF. RUN--- BIT,RWP,NMLC,NMSTAB,NMDC,I,.~.,STAB,3NMDCS,X/O,JARS,21 HWTDP BNA No.: Drillpipe Date (Top To Bottom) I 3 .O. O Weight G,r~,de Conn..ec.!!.on Clae? , Length., BHA Length: 813.94 5 21.9 G-105 4 1/2 IF ~REM N/A , Data Laat Inepecled: 07/09/91 5 22.5 S-135 4 1/2 IF PREM N/A Houri on #1621-0072 @26 .... .... Injection Dete Fuel &Weter InjectionW.l,:Pt. Mclntyre#9 I"'t': .... Ipre.aure: Fuel On Location FuelU.ed 18303 3885 [Source: Volume: Type Fluid: Fuel Received Fuel Source 600O BPX Drl. Water On Location DrL Water Used N/A N/A Drl. Water Received Drl. Water Source 220 PUT//27 PIT Potable Water on Location 3otable Wat'er"Used ....... N/A Ilia .o,eb,. wa,.. Daily Volume: :umulative Volume: Potable Water Received 0 . . .5.980 110. MCC Cutting Data Weather Data Peraonnel Safety/BOP Dale Daily:14 Temperature 35 PB DflLG I Lest BOPE Test Laet BOP Drill ~,~,/03/91 08/02/91 Cumulellve Wind Speed Contractor Last H2s Leal Fire Drill 2505 SW 18 KN 30 7/31/91 7/31/91 Storege Site: Chill Factor " Service Last Safety~t~" Leal Spill Drill L-1 RES. PIT 10 8 08/02/91 08/03/91 Well Name Date: Other ~plll (Y/N) Volume (Gals.) Pt,Mclntyre 813 08/06/91 BPX-1 N N/A Signed: Total Type Spill Report Filed? ZELJKO RUNJE 4 0 N/A N/A Time Houri Code Operallona From 0600 To 0600 , ,, .... 2100-2230 1.5 6 DROPED DRILL PIPE DRIFT. POOH TO RUN 7" LINER. .... 2230-0300 1.5 6 PULLED OUT OF OPEN HOLE WITHOUT ANY PROBLEMS. PUW WAS CONSTANT AT 370000. BEGAN TO NOTICE ADDITIONAL DRAG INSIDE 9 5/8. AT 37 STANDS OUT OF HOLE WAS STUCK, AND SWABING (@9800'). P/U KELLY AND SLOWLY WORKED PIPE , , FREE. CBU FROM THIS DEPTH. CONTINUED TO POOH. NC:) PROBLEMS UP HOLE. .... 0300-0600 3 1 1 R/U WIRELINE TO RUN 8.40" OD GAUGE RING/JUNK BASKET/CCL TO 9 5/8 SHOE. TO MAKE SURE THAT SLIPS HANDLE IS NOT INSIDE OF 9 5/8. ,, i NOTE: #1- F/P 13 3/8 X 9 5/8 ANNULUS WITH 250 BBLS OF 50/50 FOLLOWED WITH 50 BBLS OF DIESEL.PUMPED 3 BPM AT 550 PSI. #2-- ALSO, ADDITIONAL DRAG WAS NOTICED EVERY 40 '( @ CSG COLLARS) WHICH INDICATED THAT SLIPS HANDLE WAS PROBABLY BEING DRAGGED UP HOLE THUS GAUGE RING/JUNK BASKET/CCL RUN WAS CHOSEN BEFORE RUNNING 7" LINER. , , ,Prudhoe Bay Drilling----, Daily Drilling Report Pt. Mclntyre#13 a,p,h(UOrrVD) 13250/9384 JP,eviouaDepth(UD)13130 JP,o,,oaa 120 Contraolor Daily Coa* ICum. Cost Eet. Cost To Date Nabors 28E N/A Operation at 0600 Last' Cog. Next Csg, IShoe Tees LOGGING 8- 1/2 OPEN HOLE 9 5/8 @ 12737 7 @ 13250 F.I.T. 12 EMW MUD DA'TA BIT DATA MUD LOG DATA DRILLING DATA" . . . Rot. U,d~yp, COREFL. MBT 14 lilitNo. 9RR Depth 13250 Deplh 13250 wt. 215 p.u.' ........ ~',o. We~,ht 10.1+ ppglP" 7.35 Slz, 8.5 U.,WL 10.1+ PP~ WL 390 K, Wt. 145 Avg. Max. v~.¢os,y 68 ..c Pm .35 M,k. STC Form,,o, SHALE wt. N/A K# wt. N/A K~ Tr~. Tr,. pwvp 19/21 P~ .15 Tvp. F1L ,G g,e 13 ¥ atm. 24 K rS.lb O,. N/A .... Ge,a 5/18/31 Ul 1.7 S.,~.l ,o. K52998 Conn. gas - v Pu.'.mp Date '' .... Depth Ou! Pump Ho. 1 2 An W.L. 3.7 cc Chlod,., 7300 ppm MD~TV~ 13250 t,~p ,~, ......... Liner Size 6 6 ,TNP ~oo p.~ N/A ~o Oil TR % Foot,g, 183 ..x. B~G 19 v Bpu 6.1 6.1 HTHP 500 poi N/A ''' OWR TR/90.0 ADTIAST r9.25 HRS DC Expo,e,l ,,, , ,Pu GPu 256 256 So,d. 10.0 % ES N/A T.~.,ut, 80 Sh.~. ,e,,,y . ...... ~a' ' P,e...r. 34 0 0 S.,d TR % LGS 4.25 ~ ul,./u,~. 30/40 Est. po,e p,.s,. 9.5 S~o,, Pump ,,, ,ct. Vol. 872 ""' pit Vol. 390 ,,i. Jeta/l'FA .44 TFA ,oP/s,.i. 17 fph SIc,, P.S.30 30 .... D,,y M,,~ $ 3958 Total M,,d $ 146354 Bit Cost 5697 ROP~S,,,~ ~ph S~o,, P.P.425 425 (h,./,*,,o) 1400 HRS 7/11/91 "'"'~' i I I El ~1NT~ N/A , , S,r,. ,o. 65 66 SS#1C SS#11 Depth (MD) 12856 13211 13192 13191 A,,l. 21 .4 22.3 23 23 DIr.ctio, N67.6E N67.4E N66E N67E .... T.V.D. 9018 9348 ,, v,,. Se~. 8381 8513 , , , , No.h/South N3716 N3767 E,et/Weet E7512 E7634 .... r)og L,g 0.53 0.25 Accident?(Y'lN) N I'""" N/A IEm'p'°'r N/A I"P''Fi'°d?(y'N' N/A Time Houra Coda Operations From 0600 - 0600 0600-14.00 8 2,~,. DRILLED FROM13130' TO13250'. ADT=6.25 HRS. TD8-!/2 HOLE. 1400-1530 1.5 5 ~,.. CIRCULATED 60 BBLS HI-VIS SWEEP FOR SHORT TRIP. ,, , 1530-1630 1 6 ATTEMPTED SHORT TRIP TO SHOE BUT IT WAS TIGHT OFF BOTTOM.P/U KELLY .... AND PUMPED 2 JTS OFF BOTTOM. PULLED TIGHT TO 13100'. NO PROBLEM FROM ,, ,, , ~ THERE ON TO THE SHOE. WASHED AND REAMED 50' TO BO-II-OM.NO FILL. ..... , 1630-1800 1.5 5 CIRCULATED 20 BBL SWEEP. 1800-1830 .5 1 0 DROPPED SS SURVEY. PUMPED DRY JOB. ,,! ,, , .. 1830-2300 4.5 6 POOH FOR LOGS. L/D BIT, LOGGING TOOL. .. 2300-2400 I 1 1 RIGGED UP SCHLUMBERGER AND M/U LOGGING TOOLS FOR RUN #1. , 0001-0400 4 1 1 RUN #1/PHASOR DUAL INDUCTION/SP/GR/BHC ( W/GR TO SURFACE IN CASEING , ...... , ........ 0400-0600 2 1 1 RUN#2/DENSITY/NEUTRON/SPECTRAL GR/CALIPER/MICROLOG. , .... ,, , LOGGING 8-1/2 C ,! I-tOLE , ,, BNA No.: Drlllptpe D-la (Top To Botlom) N/A o D Weight {~r~de ConnectiOn Claes Length aHA Length: N/A 5 21.9 G-105 4 1/2 IF PREM N/A Date List Inspected: 5 22.5 S-135 4 1/2 IF PREM N/A Hours on Jars: //1621-0072 @26 Injection Data Fuel & Water Inj.ction W.,l: Pt. Mclntyre # 9 '!R't': 3BPM Ipr'''ur': 550 Fuel On Location Fu.I U.ed 16188 3828 ,, Source: Volume: Type Fluid: Fuel Received Fuel Source 0 BPX Drl. Water On Location DrL Waler Use~:l ' 28 E 60 WASH H20 N/A N/A ,,, Drl. Water Received Orl. Water Source 28 E 25 F/P 50/50 110 PUT #27 PIT .... Potable Water On Location '" ~otable Water' Ueed N/A , Daily Volume: Cumulative Volume: Potable Water Received Potable Water Source 85 5980 110 MCC , ', , , " C'~iting Data Weather Data Personnel Salary/BOP Data Dally: 14 Temperature 4 2 Pa' DRLG 1 Last BOPE Test Lalt"BOP Drill 08/03/91 08102191 , Cumulative Wind Speed Conlraclor Last H2s Drill Leal Fire Drill 2491 SW 12KN 30 -~,~1191 7/31191 Storage Site: Chill Factor Service Last Safety Laet Spill Drill L-1 RES. PIT 26 13 08/02/91 08/03/91 Will Name Date: Olher Spill (Y/N) Volume (Gala.) Pt,Mclntyre #13 08/05/91 BPX-3 N N/A S'~'l~t~d:' Total Type Spill Report Filed? ZELJKO RUNJE 4 6 N/A N/A Time Hours Code Operationa From 0600 To 0600 ...... NOTE: W/L TAGGED BOTTOM AT @ 13249' ......... , , ,,, , P:udhoe Bay Drilling, '- ,, --- Daily Drilling Report ~FE No.' 730038 ._j 23/31 Z. RUNJE we,,'" Pt. Mclntyre#13 Dep, h(UDrrVO) 13130/9273 IPr'vi°uaD'P'h(MD) 13004 Ipr°gr''' 126 Contraclor Daily Cee' ,~,.- ~-* Est. Co~l To Date Nabors 28E N/A Operation at 0600 Last Csg. Next Csg. Shoe Test DRILLING 9 5/8 ~ 12737 7 ~ 13220 F.I.T. 12 EMW MUD DATA ~T DATA " MUD LO~' D'~TA DRILLING DATA u.d~,. COREFL. eat 11.5 a,.o. CB~3RR 9RR o.p~h 13100 ~.,~h 13130 WL 220 " P.e. a'.b. ' ..... w,~gh~ 10.1 ppg ,H 7.1 8~.. 8.5/4 8.5 U.dWL 10.1 PPD WL 365 K~ WL 145 K~ .... ,, .... w....~ 59 '" "" .25 ".~. EASTMA STC ~.,~.~o. SND/SILT wL - ~ wL K~ .... Trq. Trq. ~v/~ 17/14 ~ .10 ~' RC476 F1L BE ~.. 30 ~ mm. 23K ,.~b OH. - , , G'~' 3/13/24 ~ 1.7 s.,,~ ,~ 0115126 K52998 co,,. ,., 0 ~ r"m, " DeptR Ou~ .... Pump No, 1 2 A~ W.L 3.8 "~ Ch~.,~a,, 7200 ~,m MO/TVD 13067 SIH z'~P ""' 0 ,THe ~0o ,,~ N/A ~ o, TR ~ F,~,,, 90 63 , . ...... ape 6.1 6.1 .ZHP ,0o ..~ N/A ~" ow. TR/90.0 AD~/ASZ 2.25 3 HRS 9c E.po...~ N/A RP~ G~. 256 256 s.""~ 10.0 ~ [e N/A ~..~./u~ 70/80 80 Sh"~' ,.n.~y N/A " ..... ~'*""" 3400 PSI .... ~'~" web s..d TR ~ LGS 4.2 ~ u,../u., 8/10 30/40 Ell. po,, p ..... 9.5 S~.. P.~p ....... H.~, WL 860 ""~' P.V.L 400 ~"~' J.~.~EA .5TFA .44TFA ROP/Sh.~. N/A ~.h S~o. P.S. 45 45 ., , ....... , ,, . , , o.,y a.~ ~ 2680 ~o~.~ ~.d ~ 142396 ~a, c..~ N/C 5697 ~oP~s,., 20 ~h s~o~ ~.P. 700 700 0." d%l !. I I"1"... ,,, (",,'",'*) 1400HRS 7/11/91 """ Iil III ..... surv. No. 6 5 , , o,,~h (,o) 12856 A..~. 21.4 iDt~.~to. N67.6E ~.V.D. 901 8 No.h/South N3716 E..~/W.~ E7512 oo, L., 0.53 Acc'ident? (Y/N) N ia.m, N/A IEmPloyer N/A IRPL Fi';"? (wu) N/A., , Time Hour~ Code Operations From 0600 - 0600 0600-0800 2 A CORED F/13004' TO 13067'. ACT=1.75 FIRS 1;. , ............ 0800-1130 3.5 6'}'t PUMPED DRY JOB AND POOH W/CORE 84. , , 1130-1230 1 21 ~D CORE 8 4. ,, 1230-1530 3 1 5 PULLED WEAR RING,INSTALLED TEST PLUG,OPENED DOORS ON RAMS TO ............................ I INSPECT RAM CAVITY FOR FISH,NO FISH WAS FOUND.COMPLETED WEEKLY BOP TEST.A~CC WAS NOTIFIED BUT NO ONE WITNESSED THE TEST. NO FAILURES. , , ........ 1530-1630 I 21 ~D CORE BBL ASSY. , , 1630-2100 4.5 6 P/U BHA g12. RIH. TESTED ANADRILL ~ 1460. OK. ..................... 2100-0230 5.5 3 REAMED FROM 12750' TO 13067'.ART=4.5 HRS, TQ=24000,RPM=80-100,500GPM, , ,, , , , ........... 2800 PSl,WOB=0-4,PUW=340000,SOW=165000,ROT ~.=215000, AROP=70'/HR , ,, ,, ,, ....... , ,,, THIS ENTIRE I~ERVAL WAS LOGGED WITH ANADRILL WHILE REAMING. BIT#9 RR,NBSTA~.,. JO,ANADRILL LOGGING TOOL,X/O,NMS-I ~,MDC,NMSTAB,3MDCS,X/O, JARS,21 JTS HWTDP BNA No.: Drlllpipe Data (Top To Bottom) 1 2 oD Welghl Grade Connection Claaa L~nglh aHA Length: 848.03 5 21.9 ~-105 4 1/2 IF PREM 7407.13 Date Laet Inspected: 7/9/91 5 22.5 S-135 4 1/2 IF PREM 4814.97 'loUts on Jura: #1621-0072 @16.5 , ,, Injection Dale i=uel & Water I i F'~., U..d I.je¢,on W.,l: Pt. Mclntyre # 9 R,t.: 3BPM Preaeure: 550 Fuel On Location 2001 6 1368 sourc,: 28E Volume: 410 Typa Fluid: WASH H20 Fuel Received 10000 Fuel Source BPX Drl. Water On Location Drl. Water Uaed 28E 60 F/P 50/50 N/A N/A , .... Drl. Water R~ceived Drl. Waler 8ource 11 0 PUT #27 PIT Potable' Water On Location 3Diablo Water' Used N/A NIA Daily Volume: Cumulative Volume: Potable Wuler Received' Potable Waler Source 470 589,5. 110 M~C ,, Cutting Data Weather Data Personnel SalelylBOP Data Daily: 0 Temperature 32 PB DRLG I Last BOPE'Test ' " Last B'0P Drill " Last H25 Laet Fire Drill Cumulative Wind Speed Contractor 2477 N/NE 3 30 7/31/91 7/31/91 Storeg~ Site: L-1 RES. PiT Chill Factor Service Last Salary'Mlg Last Spill Drill 29 1 5 08/02/91 08/03/91 Will Name Date: Olher Spill (V/N) Volume (Gale.) Pt,Mclntyre 813 08/04/91 BPX-3 N N/A , , Signed: Total i'ype Spill Report Filed? ZELJKO RUNJE 4 8 N/A N/A Time Hours Code Operallona From 0600 To 0600 0230-0600 3.5 2 DRILLED FROM 13067' TO 13130'. ADT=3 HRS. PROJECTED TD=@13250'. NOTE:WHILE DRILLING SANDSTONE/SILTSTONE TRANSITION @13067'-13080' TORQUE WAS @ 24000-27000, FROM 13080' ON IT LEVELED- OFF @ 22000-23000. ,,, ~. CORE RUN #1 .... F/12759 MD-8928 TVD TO 12819 MD-8984 TVD/REC 56.5'=94% , t1~CORE RUN #2 .... F/12819 MD-8984 TVD TO 12887 MD-9046 TVD/REC 71.5'=106% , , CORE RUN #3 .... F/12887 MD-9046 TVD TO 12977 MD-9130 TVD/REC 90'= 100% CORE RUN #4 .... F/12977 MD-9130 TVD TO 13067MD-9214 TVD/REC 90'=100% LOST FOOTAGE FROM CORE RUN #1 WAS RECOVERED ON CORE RUN #2 TO DATE: TOTAL FOOTAGE CORED =308' .,. TOTAL FOOTAGE RECOVERED = 308' , , TACT=14.25 HRS , , ,, , Pr.{Jdhoe Bay Drilling Daily Drilling Report W,ll Pt. Mclntyre #13 ,D, pt'h (MDrr~O) 13004/91 P,ev~o,, Dep,h' (MD) ' 2~87'" C~flt'r'lctor '" i Daily COst ' . . ,m C.,~,~t ' Est. Coat To Date Nabors 28E N/A OPera{ion at 0600 ' Last tag. Nex[ Csg. '' S'hoe Teat ....... CUTING CORE ~4 9 5/8 @ 12737 7 @ 13220 F.I.T. 12 EMW " MUD' D~I~A Bit DATA ......... MUD"LOG DATA DRILLING DATA .... U,,dtyp. COREFL. Mat 11.5 -ltNo. CB#2 CB#3 Depth 12977 Depl" 13004 wt. 240 ......... p.u.' ' s'.O. W.ight 10+ PPg pH 7.15 S~.. 8.5/4 8.5/4 U.,~ WL 10+ PPg WL 370 K, ,WL 155 Avg. Max. vi,oo,,y 62 '"°:Pm .25 a,k, EASTMA EASTMA Fo,ma,°, OIL SNDSTO wt. 130 K, wt. ......... Trq. " '' PV/YP 17/1 6 Pi .10 Type RC-412 RC-476 OB gsa 176 v atm. 23-24 ft.lb, el,. N/A It.lb. ................... Pump o,I, 3/12/28 Ul 1.65 se,~,l ,o.0116451 0115126 co,,. g,, 0 ....... Depth Dui ........ Pump No. 1 2 A, W.L 3.8 .clChlo,id.. 7300 ppm MD/TVD 12887 12977 T,p ,a, 0 ....... Liner Si,, 6 6 .THP ~oo p.i N/A o~i o, TR ~' ~=ootag. 68 90 Ma~..~G 385 v ........... aPM 7.3 N/A HTHP ~00 psi N/A oD owR TR/90 ADTIAST 2.25 2.75 DC Exponent N/A " R',, ......... O,M 306 N/A So.de 10 '~ ES N/A T.b~./Mt. 60 70 sha~. ,,salty N/A ~;oa ,-, p,....r. 1350 Sand TR % LGS 4.2 ~' Ml,./U,,. 4-10 4-9 Esl. pore prise. 9.5 Slow P..mp ....... ,°~e V°I. 851 ,hi. Pit VoL 425 bbl. J,te~rFA .ETFA .ETFA ROP/S,,I, N/A Ip, s~°,, p.s. 30 N/A . . .. D,iI~ Mud $ 5011.42 To.. Mud $ 139715 ,, Co.t N/C N/C RoP/S..d 30-60 Iph Sis. ~'.,. 460 N/A ,,g AC.p, ......... D.,, S01%! "'1 '1'" I "'""' " ,,,.,,.,., ,oo,,s o..,. !11 III N/A .... ,,, Surv. No. .......... Depth (MD) Angle Dlreotion , i . T.V.D. ,,, Veil. Seo. Neath/South Ee-tlWeat ........ Dog Leg Acc'l'~le n¥~; (Y/N) N I""A' N/A IEmpl°yer N/A IRPt' Filed? (Y/N) N/A Time Hours Code Operations From 0600 - 0600 0600-0830 1.5 ~ ...... CONTINUED TO L/,D' CORE #2.D. RE,S, SED 90' BBL FOR COR.E ,g,3..P/U B!T#3.ORIENTED. 830-0900 :5 ~'~ RIH W/CORE BBL #3 TO 9, 2312'. 0900-1000 i 9 SLIPED AND CUT 104' OF DRILLING LINE. 1000-1330 3.5 6 CONTINUED TO RIH W/CORE BBL #3. I 1330-1430 I 51 CBU AT 8.5 BPM/1500 PSI TO ENSURE THI:RI: IS NO GAS. 1430-1730 3 4' CORE RUN #3. CORED FROM 12887'-12977'.ACT=2.75 HRS. FIRST 15' WAS" HARD" R.O.P. WAS @10'/HR. LAST 70' CORED @ 60'/HR. 1730-2200 4.5 6 PUMPED DRY JOB AND POOH W/CORE #3 , ,, ,, ....... 2200-2230 .5 21 L/D CORE #3 ...... 2230-2330 1 22 MAJ 90' CORE BBL FOR CORE RUN #4 W/BIT #3 RR. ORIENTED. 2330-0030 I 6 RIH W/CORE BHA #4 TO500'. RC-4765 CORE BIT(. J0 FEET CORE BBL,X/O,MDC,MSTAB,3M ..... S,X/O,JARS,21 JTS HWTDP CORE BHA #4 SAME AS ABOVE (#3) W/BIT #3 RR ..... BHA No.: Drillpipe Data (Top To Bottom) CBHA #3/4 O D Weight Grade Connection Clael Length ,,, ....... BHA Length: 887.59 5 21.9 G-105 4 1/2 IF PREM 7407.13 Date Lull Inlpecled: 7/9/91 5 22.5 S-135 4 1/2 IF PREM 4679.28 ., Houri on Jarl: 81621-0072 @11.75 , , , , , , Injection Dell Fuel & Water ,.,.,,o.w.,,: I I 11384 3564 .... Source: Volume: Type Fluid: Fuel Received Fuel Source 0 BPX , Drl. Water On Locution Drl. Water Uled N/A N/A Orl. Water Received "' Orl.' Water Source '' 11 0 PUT #27 PR' Potuble Water O'n' LOcution ~otable Wat~r"U~ed "' N/A N/A Daily Volt'me: ~umulitive Volume: Potable Water Received Potable Water Source 0 5.42.5. 110 MCC , i Cutting Data Weather Data'' Peraonnal SaletylBOI~I Data I '' :Last BOPE Teat ' " Lair BOP Drill' O,.y: 1 6 :Temperature 33 7/25/91 08/02/91 Cumulative Wind Speed Conlractor Last H21' Drill Loll Fire Drill 2477 NE 3 KN 3 0 ~1/91 7/31/91 Storage Site: Chill Factor Service L'ast Safely Leal Spill Drill L-1 RES. PIT 29 13 (¥/.)C)8/02/91 7120191 Well Name Date: Other S~ill Volume (Gale.) Pt,Mclntyre #13 08/03/91 BPX-2 N N/A Signed: "' Total Type Spill Report Filed? ZELJKO RUNJE 46 .N./.A. N/A Time Houri Code Operallonl From 0600 To 0600 ..... 0030-0100 .5 6 M/U NEXT CONN., SET BACK THE SLIPS,CONT'D TO RIH,SLIPS FELL OVER AND ONE OF THE HANDLES BROKE OFF AND FELL DOWN HOLE. DUE TO THE OD OF THE HANDLE IT CANT GO PAST THE STAB OR THE BIT,THUS CONT'D TO RIH TO CORE. IF THE FISH DOESN% DISAPPEAR UNDER THE 9 5/8 SHOE IT WILL BE DELT WITH. , , 0100-0400 3 6 RIH TAGGED AT 12977'. 0400-0530 .5 5 CBU TO ENSURE THAT THERE IS NO GAS. ...... 0530-0600 .5 4 CORED FROM 12977-13004. ACT=.5 HRS. , , ,~ORE RUN #1 .... F/12759 MD-8928 TVD TO 12819 MD-8984 TVD/REC 56.5'=94% ,, ~ORE RUN #2 .... F/12819 MD-8984 TVD TO 12887 MD-9046 TVD/REC 71.5'=106% CORE RUN #3 .... F/12887 MD-9046 TVD TO 12977 MD-9130 TVD/REC 90'= 100% CORE RUN #4 .... F/12977 MD-9130 TVD TO ( IN HOLE STILL CORING) l NOTE: LOST FOOTAGE FROM CORE RUN #1 WAS RECOVERED ON CORE RUN #2 .... , , ..... , ,, ,, ,, Prudhoe Bay Drilling I Daily Drilling Report 'w."" Pt. Mclntyre#13 '" Dep, h ,uDrrvo) 12887/9046 !Previ~'"''DeP'ih("°)'' 12759 [,,o~,e,',: 128 '" Contractor '" Daily"Coet " ICum. Co'~t Est. Cost To D'~Io Nabors 28E N/A Operati(~'n ";t 0GOO ..... L-et Csg." " Next Csg. "' Shoe Test POOH W/CORE ~/2 9 518 @ 12737 7 @ 13220 F.I.T. 12 EMW ' ' 'MUD DATA ..... IgT'DAT'A ........ MUD-LOG DATA DRILLING"'D~"A ..... ,, ............................... ~ot'." U-dtype COREFL. MST 11.5 Bit,o. CB#2 CB#1 Depth 12889 D.p~h 12887 wt. 215 ' ' p.u. " ~'.o.' W.ight 10 PPg pU 7.3 Si,. 8.5/4 8.5/4 Uud Wt. 10 PP" W,. 345 K# Wt. 155 K,' , Avg. Max. v~.co.,y 62 .eD Pm .35 U.k. EASTMA EASTMA Forr,,,~o, SANDSTONE wt. 130 K# wt. 140 K#! ' ' Trq. Trq. "' pvivp 19/16 Pi .15 Typ, RC-412 SC-777 aG ,,, 130 ~ mm. 21-24 "'~" o,. N/A .... , ...... , ,, , ...... G,I, 3/13/32 al 1.6 S,rl,I No 0116451 0117058 Conn. g,, 0 v Pu,,p ........ Depth Ou . .......... Pump No. I 2 APl W.L 3.6 ~o Chloride. 7200 PPm MD/TVD 12887 12819 T"P g,, 205 v ..... .............. Liner Size 6 6 HTHP 100 psi N/A ~, oil 0 ~- Fcc,,,. 68 60 u,.. BOG 275 ~ .. ................. aPu 7.3 N/A HTHP 500 psi N/A ,c owR 0~90 ADTIAST 2.25 4.75 DC Expo,.nt .......... hPu ...... cpu 306 N/A Solid' 10 % Es N/A T.l,I,/Utr 60 60 eh.'. d....y N/A ......... ........... P,ossure 1250 web S.nd TR % LG$ 4.2 ~' U~n./U,. 4-10 10 Esl. pore press. 9.5 Sio¥, Pu,~p'"O;,'~' uol, Vol. 852 b,I Pit Vol. 425 """ JeIs/TFA .5 TFA .ETFA ROP/Sh,I. N/A Iph s,o~, P.s.30 N/A O..y Mud; 4904 Tot,I and; 134704 Bit Co,t N/A 22000 ;,OP/S,,d 10-88 Iph S,o~, P.P.450 N/A .,. A...p, ......... oN,, i' I '1"1' s°J,"l' I' .i0 (hfs/date).. . 1400HRS 7/11/91 GrAde Ill Iil N/A ................... Surv. No. Depth (MD) Angle .... Direction ...... T.V.D. , Verl. Sec. North/South ......... East/West Dog Leg X =cld'a,i? '(V/U) IH'amc ..... " Emp,o'.r p,: F.?? ; [ [ I II ........ I II i i I ...... ; I Time Hour. Code Operations From 0600 - 0600 ................. 0600-0700 1 ., _ ~,.CONTINUED TO CBU AT 6 BPM AND 1000 PSI 0700-1200 5 41" CORED FROM 12759 TO 12819. ACT=4.75 I-IRS. 1200-1600 4 6 PUMPED DRY JOB. POOH WITH CORE #1. .... 1600-1700 I 22 L/D 60' CORE BBL. ............... I 1700-1.830 1:5 .... 2.2.. ~ P(U CORE BIT #2(SO.FT. ER AND MORE AGGR.E. SIVE. THEN BIT #1)t AND 90' COR.E.. BBL AND ORIENTED. 1830-2200 3.5 6 RIH WITH CB#2.CIRCULATED @ 3000' AT6 BPM/525 PSI AND 9600' AT 5 BPM/650 PSI 2200-2330 1.5 5 CONTINUED TO RIH. CBU TO ENSURE THERE IS NO GAS. 8.5 BPM/1500 PSI. 2330-0230 3 4 CORED FROM 12819' TO 12887'. ACT=2.25 HRS.ENCOUNTERED SEVERAL HARD "SPOTS" @1' LONG LAST ONE AT12887'. DID NOT JAM THE BBL,THE BIT APPEARED DULL. ~IHA D~scrlpiton: r 130-412 CORE B~ ~ FEET CORE BBL,X/O.MDC.MSTAB,3Mb _ .~,X/O,JARS,21 .ITS HWTDP ...... aHA No.: Drlllplpe Data (Top To Botlom) CORE BHA#2 OD Weight Grade Co'nnection Claee Le ngt'h .... , ,, , , , ,,, BHA Length: 887.59 5 21.9 G-105 4 1/2 IF PREM 7407.13 , ,, Dele Last Inepecled: 7/9/91 5 22.5 S-135 4 1/2 IF PREM 4562.28 4cure on #1621-0072 @ 7.75 ,,, Injection Data' ' Fuel & Water , , ,niec,io. We,,: Pt. Mclntyre # 9 IRe'': 3BPM IP'e'u'e, 550 F-el On Lo:a, ion Fue, Used 14948 2458 , , sou,.: 28E volum.: 455 Tvp. Fl.~d: C/FWASH F.,, Rece~v,d 0 Fu,I Sour. BPX D~I. Water On Location Drl. Waler Used 28E 50 F/P N/A N/A ,. Drl. Water Received Drl. Water Source 110 PUT #27 PIT Potable Water On Location )otable Wat'er"U[e~ N/A N/A Daily Volume: =umulative Volume: Potable Waler Received' Potable Waler Source 505 ,5,,4,,,25 110 UCC Cutting Data Weather' Data Pereonnel SaletylBOP Data Daily: 4 Temperature 33 P. DRLG 1 ILeal BOPE' Tes~ ' ' Lasl BOP Drill ~{25/91 08/02/91 Cumulative Wind Speed Contractor Last H2s O '1 Lasl Fire Drill 2461 CALM 30 ~,,!¢ 1./91 ~/31/91 Storage Site: Chill Factor Service Last Safety -u Last Spill Dr L-1 RES. PIT N/A 13 08/02/91 7/20/91 Well Name Date: Other Spill (YIN) Volume (Gale.) Pt,Mclntyre #13 089/02/91 BPX-2 N N/A Signed: Total Type 'Spill Report Filed'/ ZELJKO RUNJE 4 6 N/A N/A Time Houro Code Operalione From 0600 To 0600 ,, 0230-0600 3.5 6 PUMPED DRY JOB AND POOH WITH CORE #2. ,, ,, },. CORE RUN #1 .... CORED 60'/RECOVERED 56.5'/94% ~ CORE RUN #2 .... CORED 68'/STILL POOH NOTE: WEEKLY BOP TEST WAS POSTPONED UNTIL THE WIPER TRIP WITH THE PERMISSION FROM AOGCC INSPECTOR MR. HAROLD HAWKINS WHO CONDUCTED RIG INSPECTION AND FOUND NO VIOLATIONS. i -Prudhoe Bay Drilling .... Daily Drilling Report '.'.' 08/01/91 20~25 Z. RUNJE , w,. Pt. Mclntyre #13 o, pth (uorrvo) ......... ~,'ogre.. 1 0 C~'~tractor Daily Coat -- Cum. Cio$I Esi. CoaIIT~ Data Nabors 28E ~ N/A operation at 05'~i) Last Cag, Next Csg, ' 'Shoe Teat CBU 9 5/8 @ 12737 7 @ 13220 F.I.T. 12 EMW .... MUD DATA ........... IUT'D~TA ...... MUD LOG DATA DRILLIN~'"~ATA ' ~oL' u,,d tvp. CORE FL. uaT 10.5 Bit ,o, 9 CB ~ 1 Depth Depth Wt. K# ............. p,u. ~'.'o. Weight 10 PPg pH 7.65 SI,e 8.5 8.5/4 Mud Wt. PPg Wt. K# Wt. Kit' ............ Avg. Max. vi..o,,y 65 ,.c pm .30 u.k. ST(:; EASTMA Fo,m,,o, W,. Kit W,. Kit: ...... tr~. Trq. pv/Yp 15/18 Pf .20 Typ, F 1 L SC-777 sc. gas v Sim. Il.lb OIL it. lb c.el. 2/11/17 al 1.35 S.rl., No K52998 0117058 !Conn. 0,, ~ Pump ' ' Depth Oul ..... Pump No. I 2 APl W.L 3.2 c" Ch,o,tdoa 7600 ,Pm MD/TVD 12759 T"P g.. v .... ............ Liner Si,o 6 6 HTHP 100 pat N/A ~ o, 0 %! Foot,g, 10 ua,. ac.c. BPM HTHP 500 pal N/A "c ow, 0/90 ADTIAST .2 DC E,pon,nt ...... .PM .... Sollda 10 % ES N/A T,blelalr 80-100 Shale density .... W0B ' ' Preaaura S,,d TR ~ iLG$ 4.65 % u~,./u, 30-45 E,t. pore press. Slow Pump Data , , ,, ..... Ho,, VoL 838 ,,l. Pit Vol. 500 bbl. JelI/TFA 3-13/.39 .5TFA ReP/Shale fph Slow Da,~ Mud ~ 2327 Total U.,* $129800 s, co.t 5697 22000 ReP/Sand Iph Slow P.P. Rjr}Accept Dull 111 (h,a/dat.) 1400 HRS 7/11/91 Grad. I I . F '" N/A ..... Surv. No. 'Depth (MD) Angle rD'ireclien ~, , T.V.D. Vert. Sac. ....... North/South Eaat/West Dog Lag A'cident? (Y/Ni ' N 1N'm' ''' N/A ....... IEmpl°yer N/A IRpt' Fi'la'd? (YIN) N/A Time Houra Code Operations From 0600 . 0600 0600-963.0 .5 2~ TESTED ANADRILL. OK. , 0630-1030 4 6t ~. CONTINUED TO RIH W/BHA//11 .L/D 40 JTS OF S-135 DRILL PIPE AND P/U 37 JTS _ OF G-105. TAGGED F/C AT 12616 FEET. 1030-1130 .5 5 CIRCULATED TO CONDITION MUD. OBSERVED SOME CMT OVER THE SHAKERS ..... I 15 MIN INTO C;. IRC. ULATION (TOP PLUG DID NOT WIPE PIPE WELL ?? ).RATE 9 BPM AT 2100 PSI/6 BPM AT 1500 PSI. 1130-1200 .5 E TESTED 9 5/8 CSG TO 3000 PSI FOR 30 MIN. TOOK 7.8 BBLS TO PRESSURE Up. OK. ................. , , ,, , , 1200-1400 2 2 DRILLED F/C CMT F/12617-12735. W.O.B.=10-15000,12 BPM AT 3000 PSI. 1400-1500 I E TESTED 9 5/8 CSG TO 3000 PSI . IT LEAKED OFF 200 PSI DUE TO SOFT CMT ABOVE SHOE 1500-1600 1 E DRILLED 3 FEET CMT/FS/10 FEET NEW HOLE TO 12759. ACDT = 1.5 HR/ADT =.2 HR SC-777 CORE BI~ =FEET CORE BBL,X/O,MDC,MSTAB,3ME. X/O,JARS,21 JTS HWTDP , , BHA No.: Drillpipo Data (Top To CORE BHA#1 OD Weight Grade Connection Ciasa _Length ....... BHA Length: 857.59 5 21.9 G-105 4 1/2 IF PREM 7407.13 Date Last Inapecled: 7/9/91 5 22.5 S-135 4 1/2 IF PREM 4494.28 , ,, Houri on Jara: #1621-0072 @ 2 HRS , , Injection Dale Fuel & Waler ,niect,o.W,,,: Pt. Mclntyre#9 'I"'''= I""""": """°"'°""°" .... 17406 2484 ,, source: 28 E Volume: 1150 Ty~, Fluid: MUD 'Fuel R,ceived 0 Fuel Source BPX Drl. Waler On Location Drl. Water Used 28 E 900 WASH/H20 ...... Drl. Water Received DrL Walar Source 28 E 30 F/P 770 PUT #27 PIT )otabte Water On Locution' )otahle Water U~e~- Dally Volume: Cumulative Volume: 3otable Water Received iPotabla Water Source 2080 4.920 11 0 MCC Cutting Data Weather Data Pereonnel Safety/BOP Date D,.y: 42 Temperature 34 PB DRLG I Last BOPE Teal ' " Last BOP Drill (.~umulatlve Wind Speed Contractor Lasl H2s D '1 Lael Fire Drill 24 57 E 4 KNTS 3 0 ~31/91 7/31/91 Storage Site: Chill Factor i Service Last Safety g Last Spill Drill L-1 RES. PIT 30 13 7/20/91 7/20/91 Spill (Y/NJ Volume (Gala.) We, .am, Pt,Mclntyre #13 Da,e: 08/01/91 Olher BPX-3 N N/A Signed: Total Type Spill Raport Filed? ZELJKO RUNJE 47 N/A N/A Time Hours Code Operations From 0600 To 0600 1600-1630 .5 E PERFORMEDF. I.T. TEST TO 12.0PPG EMW. HELD PRESSURE 10MIN. NOLEAK-OFF , , , 1630-1900 2.5 5 DISPLACED MUD IN THE HOLE WITH 40 BBLS OF H20 + 875 BBLS CORE FLUID AT 10 BPM/2800 PSI. PUW GRADUALLY DECREASED F/420000TO 345000. 1900-1930 .5 5 CLEANED LINES/SHAKERS. PUMPED DRY JOB. 1930-2400 4.5 6 POOH FOR CORE RUN # 1.L/D ANADRILL LOGGING TOOL. 0001-0130 1.5 21 P/U BHA FOR CORE # 1 0130-0530 4 6 RIH , , 0530-0600 .5 5 CBU FOR POSSIBLE GAS BEFORE STARTING TO CORE. 6 BPM AT 1000 PSI. ,, .... ,,, , , , ,,, Ptudhoe Bay Drillinq/- , Daily Drilling i "/ Report... ^F..o. 730038 "P~ "°' zU 7/30/91 18/22 L. PEAK ,,,, ,,,,, !w,, Pt. Mclntyre #13 D,,,, (.DnVD) 12749/8915 IP''v~°u' D,p,h (UD) 12600 JP,o,r,., 149 Dr;'" "'^" I~,,m. Casl lEst. Coil To Date co,,,.c,o, Nabors 28E N/A Operation at 0600 Last Cag. Next Csg. IShoa Test RUNNING 9 5/8 CSG. 13 3/8 @ 3149 9 5/8 @ 12754I 12.4 EMW ' ' 'MUD DATA BIT DATA MuD LOG DATA DRILLING"'0~TA Uud typ, PHPA UST 22 -, ,o. 8 D, pth 12749 D.pth W,. 230 " p.u. s.'O. ' ' w,~h~ 10.2 PP, P" 9.3 s~" 12.25 U,d Wt. 10.2 PP0 Wt. 360 ~' Wt. 160 Avg. M,,x. w.o.,y 49 s.¢ P"' .35 U.k. STC F .... ,o. shale/sand w,. 130 ~<, wt. .... Trq. T~'q. Pv/yP 14/19 P~ .15 Type MFDSHC aG gas 35 v atm. 22K ,.,b. o~,. ,,, G,~, 7/28/38 al 1.0 s,,.i No KS3762 co... ga, 5 ~ P,~,~? o~,t,,, Depth Ou~ Pump No. I 2 AP~ W.L 4.8 '" Ch,o,d.. 1500 ppm~ MDITVD 12749 ~,~p ,a. 250 ~ i Liner Size6 6 HTHP 100 psi cc o, 2 % Foo,.~. 149 ua.. ago 81 upu 85 85 I-ITHP 500 psi cc ow, 2/89 ADT/AST 8 1/2 Dc E,pone.t 'RPM' GPM 360 360 so.,~. 9 ~' ED rs,.e~ut, I 10 Sh,.,e . . . Pr.,.u,, 3750 wes S.,d TR ~' LOS 3.8 ~ Uin./U,.: 50-55 E,t. po,. pres.. 'S'~o,, Pump Da,. ,, , , .o~. vo~. 1765 b.~ Pit vol 440 b~,,. Jots/'I'FA .653 ROPlShale ~ph s~o,. P.s.45 45 ....... ,, D.i,y u,,,~ ~ 4009 ~o,.~ Uud, 126060 B, Co., $5054 ,OP/Sa.d fph Slow P.P. 475 475 " Du,i 11'1' tl.A , , , .,. ,h,.,d,,.) 1400 HRS 7/11/91 Or.ds :l'lr;dtd I I I. S,r,. ,o. 62 63 64 PROJ. Depth (UD) 12612 12707' 12724 12749 ^,,'s 22.7 21 .4 21 .3 21 .3 D~ect~o, N65.9E N66.2E N65.7E N65.7E T.V.D. 8791 8879 8895 8919 Vs,. Se~. 8291 8327 8333 8342 No,h~South N3681 N3695 N3698 N3701 , , Ee,UWost E7430 E7462 E7468 E7476 Do. L.. 1.53 1.37 1.22 , Accidenl? '(Y/N) N IName NiA IEmPl°yer N/A IRPt' Filed? (Y/N) N/A .... Time Hour~ Cods Operations From 0600 - 0600 0.6.00-0630 .5 3~,. CONT. TO LOG OVERLAP 0630-1600 9.5 21',, DRILL F/ 12600' TO 12749' AST=8 1/2 HRS 1600-1800 2 5 CIRC. 20 BBL. HIGH VISC. SWEEP AROUND 1800-1900 I 6 SHORT TRIP 10 STANDS ...... 1900-2100 2 5 ~ CIRC. 70 BBL. HIGH VISC. SWEEP AROUND , , ,,, 2100-0230 5.5 6 DROP SURVEY, PUMP PILL, POOH, L/D BIT-X/O-MWD-STAB 0230-0400 1.5 1 5 PULL WEAR RING, CHG. BTM. RAMS TO 9 5/8, TEST BONNE'i-r TO 5000PSI 0400-0430 .5 12 R/U TO RUN CSG. ............ 0430-0600 1.5 12 RIH W/ 9 5/8 CSG. ~-~^' 'b.,r~',tio,: ~. ~, 9 5/8 CASING BHA No.: Orillpipe Dale (To'p To Bottom) " 'OD'' Weight Grade Connection Cleee Long!h, BHA Length: ............... Dote' L'aet Inlpected: ...... 7/9/91 , Houre on Jara: 191 1/2 , , , , , , , Injection' Data Fuel '& Water Inj. ction Well: Pt. MclntY're'#9 IR't': 3 BPM Ipr'''ur'j ....550 ~1 p,,,. F,,~ Oh-Location Fu~'I "Oecd . .. 21989 4273 so.,c.: 28E Vol.m.: 250' Ty., Fluid: MUD 'F~,el n:celv, d 10000 F..~ So.,c. BPX ... Drl. Water On Location Drl. 'Water Uaed 28E 25 DIESEL ~'1. Water Received Drl. Water Source 770 PUT #27 .P!T Potable Water On Location 3Diablo Water' U~le~ ' Daily Volume: :umulallve V~lu'me: Potable Water Received Potable Water Source 275 .. 2! 80 110 ..... MCC C~lting Data Weather Del',; ........ Personnel ' '~afelylBOP Data iDally: 42YDs Temperature3 9 PB DRLG I Leal BoPE 'Teat La;'i BOP Drill Comolllive Wind Speed Contractor Cant H2I O;i,|25/9-~/ 1 L.,t Fi,. · Di1~7125/91 2389 YDS 0 30 , , ?/17191 7,/18/91 Storage Site: Ci~II Factor ' !Service Laet Safety Mtg Leal Spill' Drill L1 RES. PiT 39 18 Well 'Name " Date: Other Spill' '(Y~,) 7~20/91 7120/91 IVolume (Gala,) Pt,Mclntyre #13 7/30/91 N N/A Signed: ......... Total Type Spill iRepo~l Filed? " LES PEAK 49 N/A N/A Time Houra Code Operatione From 0600 To 0600 ...... ,.. ,, ,, .., , , , ,, , , Prudhoe Bay Drilling - Daily Drilling Report ~E ,o':' 730038 RPt: .o. ~' 1 D.,.' D.~a Si.c. Sp,,d,E,,, S.pv. 7/31/91 19/23 Z. RUNJE , , we,I Pt. Mclntyre//13 Dep, h,...V., I"'"'°"'"'"'"'""' I"'""'" I I Conlractor .... Daily Ca.I ICum. Cost IEsJ'. Co~t To"'Dale Nabors 28E N/A Operation at 0600 Lastc,g. N,t c,,. Isbn,Teat ........ RIH WITH BHA g 11 9 5/8 ~ 12737 7 ~ 13220J N/A MUD DATA " ~T DATA MUD LOG DATA DRILLING DATA ..... ,. ,. , p.u. ~':'0. Weight 10.3 ,,. ,u 9.0 s~.. 8.5 ..a w~. ,,, w~. ~, w~. ,, Avg. Max, Trq, Trq, PVIYP14/19 ,i .1 Type F 1 L aG ,.. v u~m. "'~"' o,. ,, ~'~' 10/30/40 ~M~ 1.0 s,,,., No K52998 co... 0.. ~ ,u~p .... Depth Oul Pump No. 1 2 ~, W.L 5.2 ~ Ch~orld,, 1500 ppm MDITVD THp ga, v ' ' Liner Si., 6 6 HTHP 100 p~i cc O, 2 % Foolage Max. BGG v ... .... UPM HTHP 500 p~l cc OWR 2/89 ADT/AST DC Exponenl RPM GPM Solidi 9 % E~ Table/Mir Shale denlily ~OB Pressure SandTR% LG8 % Min.IMax, E~I. pore pre~. 91ow Pump .... .o~. vo~. 935 ,,~..i~vo~. N/A ""~' J.t,~F, 3-13/.39 .o.~sh.~. ~,h S~o...s, ..... o,,v u,, ~ 1413 ~o~,~ u,, ~ 127473 a, co,~ 5697 RoP~s.,, ~,h s~o, ..,.,...., .OOHRS """' I,.!1 !11 N/A Surv. No. ,,,, Depth (MD) , ,, Angle Direction T.V.D. Ve~. No~h/Soulh East/We~l Dog Leg ,,. Accident? (Y/N) N INam' N/A IEmpl°yar N/A IRPI' Fi'led? (Y/N) N/A Time Houre Code Operations From 0600 - 0600 ,, 0600-1600 1 0 1'~ CONTINUED TO RUN 9 5/8 CSG , 1600-1800 2 5~ ~ CONDITIONED MUD/HOLE PRIOR TO CMT ..... 1800-2000 2 1 2 PUMPED 5~ SACKS G C~ WITH ADDITIVES AS PER WELL PLAN. DISP~CED CMT , , , , WITH 924 BBLS OF MUD (CALC VOLUME = 924 BBLS~. DID NOT BUMP TH~ PLUG. ~ FLOATS HELD. CMT IN PLACE ~ 2000 HRS. 2000-2100 1 12 UD C~ HEAD AND ~NDING JOINT 2100-2300 2 22 INSTALLED 9 ~e PACK OFF AND TESTED SAME TO 5000 PSI FOR 15 MIN. UD .............. CSG T~LS. ....... 2300-0100 2 1 5 CHANGED BO~OM RAMS TO 3 1/2 -6 AND TESTED SAME TO 5000 PSI. INSTALLED ..................... WEAR RING. 0100-0130 .5 23 INJECTED 50 BBLS OF MUD DOWN 13 3/8-9 5/8 ANNULUS AT 600 PSI AND 3 BPM .......  ¢.riPtio'n: . .. i ...... ,=~'~"~-~ "-~--- . . ' ...... , . BIT#9:BS, X/O, M~ RES GR LOGGING TOOL,X/O,STB,MDC,,.... ,J,3MDCS,X/O,JARS,21 J'rs HWT .................................................. , ,, , ,, BHA No.: Drillptpe Data (Top To Bollom) 1 1 OD Weight Grade ~:onnection Claaa' Length BHA Length: 846.26 5 21.9 G-105 4 1/2 IF PREM Date Laat Inapected: 7/9/91 5 22.5 S-135 4 1/2 IF PREM Houre on Jara: 0 , , , , , Injection Data Fuel & Water ,ni,ctton We,,: Pt. Mclntyre # 9 IRata:' 3 BPM Ipr'e'"'': 550 PSI. Fuel O. Location '"' F~l"Osed 19890 2099 so.,¢.: 28E vo~,,me: 650 Typ. Fluid: MUD F-e~ Received 0 Fuel Source BPX Drl. Water On Localion Drl. Water Used 28 E 10 F/P Drl. Water Received Drl. Water 13ource 660 PUT #27 PIT Potable Water On Location 3otabll Water' ILJied Daily Volume: ~umulallve Volume: Potable Water Received Potable Water Source 660 .2, .8, 4. 0. 110 UCC Cutting Data Weather Data Peraonnel Safety/BOP Data ..... Daily: 26 Temperature 36 Pa DRLG ! Last DOPE Teat Laat BOP Drill Cumulative Wind Speed Contractor Lasl H2a D I Last Fire Drill 2415 E 12 KNTS 30 7/31/91 7131/91 Storage Site: Chill Factor Service Last Safety'Mtg Laet Spill Drill L1 RES. PiT 18 1 6 7/20/91 7/20/91 Well Name Date: Other Spill (Y/N) Volume (Gals.) Pt,Mclntyre #13 7/31/91 N N/A Signed: Total Type Spill Report Filed? ZELJKO RUNJE 47 N/A N/A ...... Time Hours Code Operations From 0600 To 0600 0130-0400 2.5 21 L/D 12.25 BHA AND P/U 8.5 BHA 0400-0430 .5 6 RIH TO 2081 FEET 0430-0530 1 9 CUT AND SLIP 104 FEET DRILLING LINE 0530-0600 .5 6 CONTINED TO RIH. NOTE: COMPLETE CMT/CSG RFPORT IS ENCLOSED. !'., ,,, , Prudhoe Bay Drilling Daily Drilling Report ,, Well Pt. Mclntyre#13 Dopth i'LiD/~v~)) 12600/8775'1P'~evi°us DePth (MD) 12285'1Pr°g'''s 315 ,,, , ..... Contractor Daily Cost ICu~. Cn~l ""~t. Cost To Dele Nabors 28E N/A Operalion It 0600 Last Cig: Next C'a. IShoe T~I '" REAM TO BTM. TO L~ 13 ~8 ~ 3149 9 5/8 ~ 12754I 12.4 EMW MUD DATA ........ ~T DATA MUD LOG' DA~A DRILLJ'NG' D~TA .... """ ~"' PHPA u,~ 22 a~ ,o. 8 7 D,,~, 12600 Depth Wt. 200 ......... p.U. ~'.~. W,~Oh~ 10.2 ,,g pH 9.3 s~,,12.25 12.25 ,., wL 10.2 ,,g wL 350 K~ w~. 160 ........... ~ ..... Avg. Max. w..~.,~ 48 "': P' .3 ~'~' STC STC ~o,~.o. clay/sand wL ~ wL ............... ;~q. :;r~. .v/~, 15/20 P~ .15 ~YP~ MFDSHC S-85 aG g~' 65 ~ m~. "'~' o.. ,, ,, ,, ,, ,, G.~. 8/28/45 MI .9 s.,t.I .~.KS3762 JQ1907A co...~. 0 ~ P~P'~:~f '" Depth Dui ....... Pump No. 1 2 A~ W.L 4.9 =~;c~o,~.. 1700 ,,' UD/~VO 12600 ~'lP g~' 0 v , .......... Liner Size ~ H~HP ~00 ,.I c~ o, 2 ~ ~oo~.g. 848 ~. ~ 150 ~ ...... ap~ 85 85 ,mp ~oo ,.~ ~. ow, 2/89 ~s~ 16 1/4 ~c ,,u ............. ~,u 360 360 So,d. 9 ~Es T,~.~u. 100-120 sh.~. .... P"""" 3950 WOG s..d TR ~ LGS 3.8 ~ a~../u.x, 8-20 ~,~..o,. p,.... S,o.'p.., ..... ,.... H,~, wL 1743 ~ ,i~ vol 450 ~- J,~.~EA .653 TFA .778TFA ,oP~s~.~. ~p~ s~o, P.s. 50 50 . . ........ o.,~ u.a s 5023 ~o~,~ u,d $122651 a, co.t $5054 ,o~s.., ~p, s~o, P.~. 675 675 o.,, i' '1 '1 121w0n 4OOHRS """ Iil Xl N/A .... ,,. , ,. s,,~. ,,. 58 59 60 61 SS¢1 SS~2 ,, ,,, o,p~h(MO) 12236 12331 12426 12519 12489 12489 .... A,¢, 28.6 27.6 26.3 24.1 26.0 26.25 ................. OIr,,~, N65.SE N65.TE N66.0E N66.5E N66.0E N65.0E ,,,, r.v.o. 8453 8537 8622 8706 ..... , .... v,,. s,,. 8127 8172 8215 8254 .. ,o,,h~So,,,iN3614 N3632 N3650 N3666 ,., E,,~w,,~ E7279 E7320 E7360 E7396 ...... ,., oog L.g 1.65 1.05 1.38 2.38 .......... , ,, ,, , .... ,, ,, ,, 0600-1600 10 ~,. DRILL F/ 1~85' TO 12600' ADT=7 1/4 HRS 1600-1800 2 5~ t CBU, DROP SURVEY, PUMP DRY JOB .... 1800-2230 4.5 6 POOH , , 2230-2330 I 6 C/O BHA '' t 2330-0330 4 6 , RIH, CK. MWD~ BENCHMARK (3389') -- OK I ....... 0330-0430 1 3 REAM 60' TO LOG OVERLAP ,, , .... 0430-0530 1 8 RIG REPAIR, BROKEN LINK ON ROTERY TABLE CHAIN ........................ 0530-0600 .5 3 REAM 30' TO BTM TO LOG OVERLAP ....... , ....... ,, ..... ,, , ..... , ,, ...... ~ Deacription; ' '~--~'~',' ~ ;"' BIT#8, X-O, ANAD: LWD, NM STAB, MONEL DC, NM STAB, :)NEL DC, STAB, JARS, SDC, X-O, = 245.00', 21 HWDP .... BHA N°.: Drlllplpe Data (Top To Bottom) 10 OD weight " Grade Connection Claaa Length' aHA",',ngth'~ 876.84 5" 21.9 G-105 4 1/2 IF PREM. 6241 Data Leal I~aPecte'd: ........ 7/9/91 5" 22.5 S-135 4 1/2 IF PREM. 5482 , . Houri on Jara: 182 3/4 ,, .............. , ..... , , ,., ,,',. ; .... Injecllon Data Fusl & Water 16162 2865 ....... sO.';'~.= .... 28E velum,= 250 ry~ Fluid: MUD F.ol ,,ceived 10000 F.,I Sour'c, BPX Drl. Water On Location Drl. Waist Uteri .... 28E 25 DIESEL ...... ,,, Drl. Water Received DrL Water Source 990 PUT 827 PiT .... Potable W~t'~r On' Location 3GaBble W'ater"[J;e~ .... Dai'l~'"'Voluma: '-~mulativa Volums: Potable Waist Recslved Potable Water Source 275 ... ..1.,90_5 110 MCC Cutting Data Weather Da't~ Psraonnel .... Solely/BOP Dat" D,'y: 64 yds. ;T~mperature 37 PB DRLG 1 Last BOPE Teat Last BOP Drill ..... 7/25/91. 7/25/91 Cumulative Wind Speed Contractor Laa~ H2s Drill Last Fire Drill 2347 yds. 12 KNOTS 30 ~.7/91 7118/91 Slorage Site: ' ' CJ~'lll' Factor S~Jvlce Last Safely Lest Spill Drill L1 RES. PIT 20 17 7/20/91 7/27/91 . W~Jl'"'Nams ' D~te: Other Spill (YIN) Volums (Gale.) Pt,Mclntyre #13 7/29/91 N N/A Si~'d: .... Total Type Spill Report Filed? LES PEAK 4 8 N/A N/A Time 'Hour~ Cod~ Operationa From 060~) To 0600 ..... ,, ........ , , ,. ,,, ,, ,, , ...... , , , ..... P 'udhoe Bay Drilling ..... Daily Drilling Report AFE No. 730038 IRPt' N°', 18 ID"t- . 7/28/91 .IDaye since s~a'£e~ 16/20 IsuPv' InIt' L. PEAK w,, Pt. Mclntyre #13 Depth (MDnVD) 12285 / 8497 JP~*~ou. D;',,h'(MD) 11735 I"r°gr''" 550 ~ntr~ctor D~i'ly Cot* ~,,- ~-, I~t'. Coat To Date Nabors 28E N/A Operation at 0600 Last C,g. Next C,g. Isho, Test DRILLING 13 ~8 ~ 3149 9 5/8 ~ 12754I 12.4 EMW '"MUD UA~X"' ~ UATA ~UD LOG"UA~A UmLU,G DA~A ................. Ua, ty,, PHPA ua~ 25 a,,o. 7 6 D~Pt~ 12178 D""t~ 12285 wL 225 " ~.u. ~.o. ' "' w,~,ht 10.1 ,,, ,H 9.4 S~=. 12.25 12.25 U.,WL 10.1 ",, WL 240 ~" WL 160 CLAY/SAND A,". w..=.,y 50 "~ "~ .35 a'~' STC SEC ~....,o, wL 115 ~" wL 155 ..., Trq. Trq. ,wv, 15/20 "~ .175 ~Y"* S-85 S82FLJ4 aG ~.. 120 ~ m~. 25-32 "~" o,. 25K ..... Pum~ ~f~f .. G'~' 9/25/35 ~ 1.0 s.,~,~ ,=. JQ19074 551423 co,.. g~. 2-25 "' Pump Ne. I 2 Depth A~ W.L 4.2 " ch~=.~.. 1900 ,P' M~W 11752 T'~, ~' 140 v ...... Liner Size6 ,~H, ~oo ,,~ ,. o, 2 ~ ~o~,g, 533 474 ~.. a~G 185 ~ .. ,.. , , . apa 88 88 HTHP 500 p*l ¢c owR 2/89.5 ADTIAST 9 11-15.5 DC Exponent ... '" ~"" 373 373 s=,a. 8.5 ~ ES ~.~,/a, 100-120 100 Sh.~, ~oa P'"""" 3650 s.., TR ~ ~s 3.5 ~ u~..,,.. 8-25 45 ~'" "~" ""'" s,.. pu~, ,,, ..... Ho,, vol 1655 bbl. P, VoL 480 bbl. J,I,RF* .778 IFA .699 IFA ROPISh,I, Iph s,,w p.s. 45 45 ,, , , D,,y Uud ~ 5798 Toga U~d S 117628 a, C,,~ $0-- RR $11,112 ,o,/s~,* ~,h S~,, P.P. 450 450 (h~.,d.t.) 1400HRS ~,,~, !!! F! IIn~p: N/A ,,, s,,,. ,~. 52 53 54 55 56 57 SS~I SS82 ,,,, D, pth(UD) 11671 11763 11859 11954~ 12046 12141 11611 11611 ,, ~"~" 35.9 34.9 34.5 32.1 30.9 30.1 37.5 37.75 mr,,u,, N67.3E N67.4E N67.3E N66.8E N67.0E N66.7E N67.0E N69.0E T.V.D. 7977 8052 8131 8210 8289 8371 , v,,. s,~. 7825 7878 7932 7984 8032 8081 , , ,,,h/S,~h N3495 N3516 N3537 N355] N3576 N3595 ~"~"~ E7001 E7050 E7100 E7148 E7193 E7237 ...... D,~ L,g 2.39 1.09 0.42 2.54 1.31 0.86 , , ~cci'e'Ai'",Y/N,' N IName ' N/A [Employer N/A IRPI'F'I'd?(Y/N) N/A ,,,, , , Time Hour~ Cede Operations From 0600 - 0600 ,, 0600-0730 1.5 ~. DRILL F/ 11735'TO 11752' ADT= 1/4 HR, AST= 1 HR, , , , ,, ,,, ,, .... 0730-0930 2 ~ CBU, DROP SS SURVEY, PUMP DRY JOB ,, . , ....... , , ,, , 0930-1400 4.5 6 POOH , ,, 1400-1500 1 6 C/O DYNADRILL + BIT, REDRESS 4 STABS ,,, , .... , ,, 1500-1530 .5 6 ! RIH , ,,, 1530-1630 1 9 CUT 104' DRILLING LINE , , 1630-1930 3 6 ~IH, TE~T ~WD ~ BENCHMARK (36~'}. - OK 1930-0600 10.5 2 DRILL F/ 11752' TO 12285' ADT= 9 FIRS ..... NOTE; Bit~ 7 is a rerun from Pt. M~lnWre ~ 10 [aHA De~cripllon: BIT#7, DYNADRILt .... -O, F-S, NM STAB, 2 MONEL LDO, NM S-I.~,., ANADRILL MWD/LWD, NM STAB, MONEL DC, NM STAB, 3 MONEL DCS, STAB, JARS, SDC, X-O, = 302.84 21- HWDP BNA Ho.: Drlllplpe Data (Top To Bottom) 9 OD Welg'hl Grade Conne'cll0n C!.at~_ Length ,, BHA I:englh: 934.68 5" 21.9 G-105 4 1/2 IF PREM. 6241 IDate Laet Inspected: 7/9/91 5" 22.5 S-135 4 1/2 IF PREM. 5109 , Houra on Jera: 175 Injecllon Data Fuel & Water ,njectionWel,: Pt. Mclntyre#9 IRate: Ipreaaur": FuelOn'Loc.lion 9027,., F~'l'Us.d 4999 ..... , .... Source: Volume: 0 l'yp~ Fluid: Fuel Received 0 Fuel' Sourc. BPX ,. DH. Water On Location Drl. Water Used Drl. Water Received Drl. Water Source 440 PUT #27 PIT Potable Water On Location 3olable Wal~r"[Jsed" , , Daily Volume: :umulatlva Volume: Potable Water Received Potable Water Source 0 1630 110 ,,, MC(';, Culling Data '" Weather"Data '-'"" Personnel Safety'lBOP Data O.ily: 40 YDS Temperature 3 5 PB DRLG 1 Leal BOPE Teat Last BOP Drill ,7i(25/91 7/25/91 Cumulative Wind Speed Co'nlractor Last H2a D I Last Fire Drill 2283 YDS 7 KNOTS 30 7/17/91 7/18/91 Chill Factor Service Leal Safety'l~l-g Last Spill Drill slot,g, sit,: L1 RES. PIT 24 16 7/20/91 7/27/91 Well Name Date: Other Spill (Y/N) Volume (Gala.) Pt,Mclntyre #13 7/28/91 N N/A Signed: Total Type Spill 'Report Filed? LES PEAK 47 N/A N/A Time Houra Code Operations From 06~) To 0600 "' , , },, , '" Pi'udhoe Bay Drillinq~~' Daily Drilling Report APE No. 730038 Rpt. N,,. I 6 7/26/91 14 / 17 L. PEAK w.,, Pt. Mclntyre#13 Depth (UDnVD) 11341 / 7718 IPreys°us Depth (MD) 11250 IP'°g'es' 91 I I Contractor Daily' Coat ir',,., ~,~., lest. Cost T~ Date Nabors 28E N/A .... Operation it 0600 " Last Csg. Next Csg. Shoo Test DRILLING 13 3/8 @ 3149 9 5/8 @ 12754 12.4 EMW MUD DATA I~T DATA MUD LOG DATA DRILLING DATA '' ....... ,Nd type PHPA ,"T 23 mt,o. 5 6 Dep,h 11309 D,pIh 11330 Wt. 200 P.U. S.O. Weight 10.1 ppg pH 9.0 Sl,e 12.25 12.25 ,udWt. 10.1 PPg wt. 315 K~ Wt. 150 K# ..... Avg. Max. vis,osi,v 54 .DC Pm .3 Uake SEC SEC Fo,ma,on claY/sltstn/sd ;wt. 115 ~ wi. 130 :Trq. Trq. pv/ve 13/24 Pt .1 rye. 882FLJ4 S82FLJ4 aG gas 6 ~ i[itm. 21K II.~b O,i. 24K G.,a 15/52/65 "~ .7 So,~.i No 551424 551423 Conn. gus 0 v Pump .,Data ,, Pump No. I 2 Depth Oul APl W.L 5.2 cc Chlorides 2000 ppm MO/TVO 11278 Trip gas 2 ' ' Liner Slxe 6 6 HTHP 100 psi cc o, 1 ~' Foo~,g. 1448 ~l M,,. ,~G 1 3 ap, 88 88 HTHP 500 psi cc OWR 1/90.5 ADTIAST 41 3/4 3 1/2-0 DC Exponent ... Gpu 373 373 So,da 8.5 % ES T,hi,~Ulr 90-110 100-110 Sha~e W'6B P,e.su,. 3800 S..d TR % LBS 3.6 % u,,.,u.,,, 30-50 45 Est. pore press. Slow Pump Data Ho,. VD,. 1560 bbi, Pit Vol. 400 bbl. Jets/I'FA .653 TFA .699 ROP/Shale Iph Slow P.S. 45 45 ..... , ..... o.J,yUud, 4842 Tol..,,ud$105771 ,,Co., $11.112 $11.112 ,OP,S.n, ,ph Slow P.P. 500 500 .,g x~cep, ' ' ON,, 2151btlM I I I .,..e,ease ,h..,d.,., 1400 HRS 7/11/91 '"""'El ~lw~", I I I N/A s,,,,. No. 49 SS#1 SS#2 De,th <MD) 11197 11197 11197 A,gte 43.3 44.0 44.25 re,et.lo. N68.1E N67.0E N67.0E T.V.D. 7613 V,,. Sec. 7523 Uorth/SoulhiN3389 , E.sUw,t !E6717 Dog L.g 2.65 'Ace,d..,,,V,,) N J..m. N/A JEmp,oyer N/A J,p,.F,.d?iV,,, N/A,,, Time Houri Code Operations From 0600 - 0600 0600-0800 2 ~ D.R. ILL Fi 11250'TO 11278' AST- 2 .. 0800-0930 1.5 ~t CBU ,, , , ,, 0930-1000 0.5 1 0 DROP SS SURVEY, PUMP DRY JOB , , ...... , , , 1000-1430 4.5 6 POOH I 1430-1530 1 6 CHANGE BIT,MWD+MOTOR, REORIENT 1530-1730 2 1 5 PULL WEAR RING,SET PLUG,TEST BOPE, SET WEAR RING , , ,, ,, , 1730-1900 1 21 TEST ANADRILL MWD @BENCHMARK (3668')~AZIMUTH 10-12 DEGREES OFF 2000-2230 2.5 6 POOH,C/O ANADRILL LOGGING TOOL 2230-2330 1 6 RIH 2330-2400 0.5 21 TEST ANADRILL MWD @ BENCHMARK --- OK , , 0001-0200 2 6 RIH BIT#6, 1 DEGREE 15' "¥NADRILL, X-O~ F-S, NM STAB, 2 MONEL ..lC, NM STAB, ANADRILL MWD/LWD, ,, ............ NM STAB, MONEL DC, NM STAB, 3 MONEL DC, STAB, JARS, SDC, X-O, = 302.40 , 21 HWDP BI'lA No.: Drillpipe Dale ~op To Bottom) 8 OD Weight Or;,c~e Co~'nectlon Claaa ,L ,e.n. gth BHA Length: .... 934.24 5" 21.9 G-105 4 1/2 IF PREM. 6241 , Date Last Inapecled: 7/9/91 5" 22.5 S-135 4 1/2 IF PREM 4166 Hour, on Jars: 145 . Injection Data Fuel & Water ,n,'c,,o. W.,,.' Pt. Mclntyre # 9 IR''': 3 BPM IPi'''"'': 600psi Fue, On Loc.,,o. F.~;,' U.ed 18658 3097 so'urce: 28E Volume: 175 Typo Fluid: MUD Fuel Received 0 Fue~ Sourc. BPX Drl. Waler On Localion !Drl. Water Used 28E 30 DIESEL Drl. Water Received 'Drl. Water Source 450 PUT #27 PIT rPotable Water On Location Potable Wal~r"U~ed .... Daily Volume: Cumulative Volume: :Polable Water Received Potable Water 5ourcs 205 1,460 0 MCC Cutting Date Weather Date personnel Salely/BOP Data '' D.l~y: 21 Temperature35 PB DRLG I Last BOPE Tesl Last BOP Drill 7/25/91 7/25/9'1 Cumulettve Wind Speed Contractor Lasl H2s Drill Last Fire Drill 2187 10 KNOTS 30 7/17/91 7/18/91 S,or,g. Site: L1 RES. PiT Chill Factor Service Last Safety Mtg Last Spill Drill 18 14 7/20/91 7/20/91 w,, N,m. Pt,Mclntyre #13 D.t.: 7/26/91 Other Spi,' (Y/N) Ye,urns (G.I..) N N/A Signed: Total Type Spill Report Filed? LES PEAK 4 5 N/A N/A Time Hours Code "' Operations From' 0600 T~ 0600 .... . . 0200-0600 4 2 DRILL F/ 11278'TO 11341' ADT=3 1/2 , I , ,, ... -- ,,Prudhoe Bay Driilino----,, ,--- Daily Drilling Report AFE No."' 730038 ,7 7/27/91 15/18 L. PEAK w,,, Pt. Mclntyre#13 Depth (uorrvo) 11735 / 8027!P'"'°" °*"'" ("°) 11341 IP'°gre'' 394 Conlrector '" Dally Coal ..... Eat'.' Coal To Dale Nabors 28E N/A Operation at 0600 Leal Cag. Next Csg. Shoe Te,,t DRILLING 13 3/8 @ 3149 9 5/8 @ 12754 12.4 EMW MUD DATA BIT DATA MUD LOG"DATA DRILLING 'DATA '' , ........ Roi. u..d tvp. PHPA MBT 25.0 mt Ho. 6 Deplh 11730 Depth 11728 Wt. 210 p.u. s'.'O. w,~ht 10.1 Ppg P' 9.3 s~,, 12.25 U.dW,. 10.1 PP" Wt. 325 ~<# Wt. 150 , , ......... Avg. Max. vl.co,,y 52 "c P'" .35 u.~,. SEC Forma,on clay/snd/sltst w,. 115 ~<" wt. 160 , , , ' ' , ..... Trq, T'rq. pv/Yp 15/22 P~ .1 Type S82FLJ4 sG ~,,, 33 ¥ atm. 21-24 It.lb O,. 25K It.~'. Pump Data G.I. 10/34/40 u, 1.0 s.,.t aD 551423 co.,. ~.. 2-12 v ....... Depth Ou~ Pump No. I 2 APt W.L 5.0 cc Chloridaa 2100 ppm MDITVD Trip O"' none .... Liner St,, 6 6 HTHP 100 pal cc o, 2 % Foot.ga 457 U,x. BGG 73 BPU 90 90 ,THP 500 p,~ .~ OWR 2/89.5 ADTIAST 10.75-14.. DC Expo,,nt ~RPU GPU 381 381 Solid, 8.5 % ES !TablelMtr100-110 Sha~, ....... Pr.,ur, 3800 WOB S..d TR ~' LGs 3.5 % U~../..., 45 Eat. pore press. $1o. Pump Data .ol. vo,. 1616 b~,,. P, vol 400 ..t. Jeta/l'FA .699 TFA ReP/Shale Iph s~o~, P.S.45 45 ,, , D.,v U,d $ 5459 Tot.~ Mud $ 111225 mt Co.t $11,112 ,OP/S.,d ~ph S~o,,, P.P. 450 450 'Rig Accapt '" Dull ,'1,."'1 .... I" !11 Rig Relea,a ,h,e/d.,., 1400HRS 7/11/91 G,.d. II! II! Sur,. No. 50 51 Dep,h (UD) 11388 11577 ,,, 'A..I. 40.5 37.9 Direction N70.9E N69.0E ....... r.V.D. 7755 7902 Va,. Sec. 7650 7768 North/South N3433 N3474 E.,/w.at E6836 E6948 Do; L.~ 1.76 1.52 , , Accident,(Y/N) N IName N/A IEmPl°yer N/A IRPI' Filed? (Y/N) N/A Time Hour~ Code Operations From 0600 - 0600 , , 0600-1200 6 ~ DRILLF/ 11341' TOl1445' ADT--1 1/2, AST=4 ...... , ,, , , .... 1200-2400 12 ~I",.. DRILLF/ 11445' TO 11658' ADT=31/2, AST=7, , .... , ...... 0001-0600 6 2 DRILL F/ 11658' TO 11735' ADT=2 1/4, AST=3 1/2, I BIT#6, I DEGREE.' 'DYNADRILL, X-O, F-S, NM STAB, 2 MOl',, __DC, NM STAB, ANADRILL IVlWD/LWD NM STAB, MONEL DC, NM STAB, 3 MONEL DC, STAB, JARS, SDC, X-O, =302.40, 21 HWDP , ....... BHA No.: Drlllplpe Data (Top To Bottom) 8 OD We'~ghl Gr~c~e Connection Class Lengl!~ BHA Length: 934.24 5" 21.9 G-105 4 1/2 IF PREM. 6241 Date "Lsat Ini'pecledi .......... 7/9/91 5" 22.5 S-135 4 1/2 IF PREM. 4560 Houra on Jars: 164 1/2 InJe~tion Date Fuel & Water Inj.ction Welh Pt. Mclntyre # 9 'l~;,t,~ .... I , 3 BPM pr.,eu,.: 550 psi Fue, On Location 14026 Fuo, Used 4632 So.',c,: 28E Volume: 150 Tyl~e Fluid: MUD F~'&'i Received 0 Fuel So,,rc. BPX :Drl.'"Water On Location Drl. Waler Used 28E 20 DIESEL Drl. Water Received Orl. Water SourCe 750 PUT #27 PIT P~'i~ble Water On Location' Potable Wat~'r' U;,ed ' ' Dli'iy' Volume: Cumulative Volume: Potable Water Received Potable Water Source 170 =1.6...3.0_ 0 UCC Cutting 'Date Weelher Data Pereonnel Sal~tylBOP Dala o,,'y: 56 YDS Temperature 45 Pa DRLO 1 Last BOPE Test Last BOP Drill 7125/91 7125191 Cumulative Wind' Speed Co'ntrsctor Last H2a Drill Last Fire Drill 2243 YDS 10 KNOTS 3 0 7/17/91 . 7/18/91 S{;a'rsga Site: Chill Factor ~ervlce Lasl Salely Dig Last Spill Drill L1 RES. PIT 34 15 7/20/91 7/20/91 Well Name Date: Other Spill (YIN) Volume (Gale.) Pt,Mclntyre #13 7/27/91 N N/A ...... Signed: LES PEAK io,.I 46 Type Spill Report Filed? N/A N/A Time Houra Cods Operations From 0600 To 0600 , , , , .. .... 41aska 011 & Gas Cons. Commi~.~inn ' Anchorage .. ~ '; P~dhoe Bay Drilling ~--" -" Daily Drilling Report XFE ,o. 730038 Rpt. ,o. 1 4 O,t. 7/24/91 D,y, Si,ca Sp-d~E.t 1~/ 15 S.,p,,. I,iL L.PEAK Well ' '"' Depth (IdD/TVD) · D~pth' (la'D) ' " Pt. MclNTYRE #13 10744 / 7296 [p,,;iou, 9830 [Progreea 914 Contractor ....... Daily Coat ICum. Co.t ....... lEal, C~,t To'Date'" i NABORS 28 E " N/A Op'eration at 0600 ..... Laet ceo.' .. He.t c.g. Isho. Teat ......... DRILLING 13 3/8 @ 3149 9 5/8 @ 12754I 12.4 EMW MUD DATA ........ B~T DATA MuD LOG"~ATA DR~LUNG"'D~TA U,d typ. PHPA MaT 23 alt .o. 5 4 D. pth 10718 D. pt, 10744 iw,. 195 Kill .... P:U. ra.o. W.1oht 9.9 pp, pH 9.2 Si,, 12.25 12.25 U,,d W~. 9.9 PP" Wt. 300 K, Wt. 135 , ,, , Avg. Max. v,.co.,,, 49 ..c],m .3 ..k. SEC STC ,o,..,io. c!a¥/~ands, tn ,,,. ~ 05 ~, ,,,. 155 .............. ~'rq. ITrq. ' "'" PV/¥P 11 /16 P~ .1 Type S82FLJ4 FlCL aGgae 15 v Btm. 21K It. lb, OII. 24K It.lb. .............. Gel. 6/40/55 u~ .6 S.ri.~ Ua. 551424 NB4623 Co.n.g.. 0 ~ Pure., D,t..,. .... Dej~th Oul .............. Pump No. 1 2 AP~ W.L. 6.0 .c Ch~ori,e. 2000 PP"' MD/TVD 9830 Tr~p ge. 26 ' "' Liner Slze 6 6 HTHP 100 psi cc eli 1% ~ root.;. 914 165 ~=. ago 30 , ...... .pa 9 9 ,zHp ~oo p.i ., ow. I / 91.5 ADT/AST 15.75 - 3 I - 1.5 ~ ' ' RPM ................... GPM 381 381 ~Solid' 7.5 ~ ES T.bi.~M~, I O0 100-90 sh.,. den.ity .... won ....... P"""" 3400 S..d TR ~ LOS 3.1% ~ ui../u.,, 50 30-50 E.t..re ~r,... Slow Pump . L .,, ..... ,Hole Vol. 1480 bbl Pit Vol. 500 bbl. JeII~FA~ .653 .65TFA RoP~s..~. ~. a~.. P.a. 45 45 , , ........ , , D.,~u.,$ $6641 ~.~.u.,~ 90323 ,,c.. $11112 $10978 .oP/s.., ~,, s,o.P.,. 450 460 ....... L,, , ,i, ~..., .~,, I ! I' 21 ~IBt ~ "~'; "'"'" (...,..,.~ 1400 HRS 7/1~/s~ """' ! ! ! FI IIN~d N/A " ,, , . ' .... . su,~. N.. 42 43 44 45 , ....... , ......... Depth (MD) 9809 10032 10285 10535 . ,, i A.,,, 50.7 51.2 50.8 50.2 .., , ,, ,,, , ,. Direction N~2.1E N~2.~E N~2~gE N~4.3E ........ ~.v... 6704 6844 7003 7162 ...... , .......... v... s... 6476 6650 6846 7039 .... , ...... ,,,,. ..,,,/s..,h N2937 N3018 N3109 N3194 ....... -,, , ......... E..,/w,., IE5773 E5926 E6100 E6273 ,, ,, .. Dog Leg 1.36 0.23 0.24 0.49 ..... Acciaent? (Y/N) .... N N~me '" N/A Em'ployer N/A Rpt". ~Jl.d? (Y/N) N/A .... ,., ,,, . ,, ,~. Time Houri Code Operation~ From 0600 - 0600 ...... , , , 0600-1200 6 ~. DRILL F/9830 TO 10050 ADT=3.5 , AST=1.25 ............. , ...... 1200-2400 12 '¥~ DRILL F/10050 TO 10590 ADT=9.75 ,., .,,, , ,. ,., , , 0001-0430 4.5 DRILL F/ 10590 TO 10729 ADT=2, AST=1.75 ,, . ......... . ....... 0430-0530 I SERVICE MUD PUMP ,, ,, ~ " ......... , ,. , .... 0530-0600 0.5 DRILL F/ 10729 TO 10744 ADT=0.5 , ,, ..... ,,. ....... . ...... TOTAL ADT = 15.75 , AST = 3 .... ,,, ,. , , . , ,. , ........ , , , ,,, ,,,, , ,,,,. .... ................ BIT#5,1 DEGREE E D,X-O,F/S,NM STAB,2 MONEL LDC,NM~. J,MWD/LWD,NM STAB,MONEL DC, , , ...... , ..... - ~ ~. ............... ,, NM STAB,3 MONEL DCS,STAB JARS,SDC,XO = 302.42 , 21 HWDP , ,, BHA No.: Drillplpe Data (Top To Bottom) 5 OD W.~ght ' O';:d. ' Co..'e~,'~o. Ci,,a "L..,th BHA Length: 934.:::'§ 5" 21.9 G-105 41/:) IF PREM 0810 .... ,, Date Last Inspected: 7/9/91 Hour-, on Jars: 118 Injection Data Fuel & Water Injection Well: PM -~9 IRate: JPreelure: Fuel On Location Fuel Used 16438 3475 .... Source: Volume: 0 Type Fluid: Fuel Received 0 Full Sour. BPX ...... DH. Water On Location OrL Water Uaed :Drl. Water Received 'Drl. Water Source 900 PUT #27 PiT P~)table Water On Locatio~ ' ' ~otable Wat~r'Uaed Daily Volume: Cumulative Volun~e: P01abl. Water Received " 'Potable Water Source " 0 950 0 MCC , ,,,, , , , Cutting Data Weather Dali Per'sonnel SaleIy/BOP' Data Daily: 7 0 Temperature 3 9 PB DRLG 1 Last BOPE Te.t , Last BOP' Drill Cumulative Wind Bp.ed Co.ta, ctor Last .2, O 17/91 'Last Fire Drill 2110 6 KNOTS 30 7/17/91 7/18/91 Slorage Site: Chill Facior Servl(~'s La~I Safety'M'Ii~ Laat Spill Drill L 1 RES. PiT 32 1 5 7/20191 7,/20/91 Well Name Date: Other Spill (Y/N) "',~luma (Gale.) PM #13 7/24/91 N N/A Signed: Total Type Spill ' LRepo. Filed? LES PEAK 46 N/A N/A , Time Hours Code Operations From 0600 To 0600 ,, · ,, ,, , ,, ,. ,,, Prudhoe Bay Drilling, - .... Daily Drilling Report i ~ 7/25/91 13/17 L. PEAK w.,i Pt. Uclntyre #13 D, pth"(aO/TVO) 11250 / 7650 iPrev~°u' Depth (MD) 10744 IPr°ar''a 506 Contractor Daily ,-'-_. lC'urn. Cost " _ Esl. Coat To Date .... Nabors 28E N/A Operation at 0600 Last Cag. Next Csg. Shoe T~,'i DRILLING 13 3/8 @ 3149 9 5/8 @ 12754 12.4 EMW MUD D'~I'A " BIT DATA MUD LOG D,~TA DRILLING' DA'fA .......... , .... Rot. Uud typo PHPA UST 23 Bit No. 5 Depth 1121 5 Depth 11225 Wt. 200 ~.U. '" S.'O. Weight 10.1 Pp, P" 9.3 S,x. 12.25 U.d WL 10.1 PP" W,. 290 K~ Wt. 150 K~ ' ' A;g. Max. Vi*coaity 49 a,o Pm .35 U,ke SEC Formation CLAY/SLTST wt. 90 K~ wt. 130 ,, , ' ' ' T'rq. Trq, PV/YP 13/24 Pi .15 Typ. S82FLJ4 sG ,aa 13 " Btm. 20K ..i,., o.. 24K Pump Data G.I. 10/35/50 Ui .7 's,..I .o 551424 Con.. ,.. 1 0 D~pth 0~1 .,, Pump No. 1 2 AP~ W.L. 5.3 cc Chlorides 2100 ppm MDITVD Trip ,as N/A ........ Liner Size 6 6 HTHP 100 ps1 cc oil 1 ~- Foot,aa 1420 ".x-S~ 20 . .... s., 90 90 HTHP 500 psi cc ow. 1/90.5 ADT/AST 30 - 9 3/4 DC " n'i~. . .. DP. 381 381 So,ida 8.5 % ES T.,I.~Ut, 90-110 S,.le .... P.es.u.. 3600 WOe S..d TR % L~S 3.6 ~' Min./Max, 50 Est. pore press. Slow Pump Dat'a ,oi. vo~. 1545 ~,b~ Pit Vol. 440 ,,,I. ,~,tan~X .653 TFA ROP/Shale Iph s~ow P.s. 45 45 D.ii~ and, 10606 To~.l .,,d, 100929 Bit Coat $11,112 ,OP~Sa.d fph Slow P.P. 500 500 ........ <hr./dst., 1400HRS 7/11/91~,,d. I! !, II ,! ,, Surv. No. 46 47 48 ... O.pth(~O) 10726 10915 111041 ,, X.,l. 48.0 46.5 45.6 , ...... Oir.oUon N64.7E N66.5E N69.4E T.V.D. 7287 7416 7547 v.,. s,,. 7183 7322 7458 .. No.h/So~th N3257 N3314 N3365 .... E.a~/We.t E6403 E6530 E6656 Do, L., 1.1 6 1.06 1.20 Accident? (Y/N} " N Name N/A Employer N/A npt. Filed? (Y/N) N/A ,., Time Hour~ Code Operations F~om 0600 - 0600 0600-0600 24 ~, DRILL F/10744' TO 11250' ADT = 14.25 FIRS, AST = 6.75 HRS, ............ .. .... I ... ,, , , BP" Exploration Daily Drilling Report AFE No. 730038 Rp~. No. 13 7/23/91 11/13 Z.RUNJE ......... Well ................. Depth (UDrrV'D) ...... 9830-6714 J'Pr.v,ous DePth (uD) IProgrees PT. MclNTYRE #13 9665 165 C~n'i'raClor .... Daily Cost ICum. Cost ' E;t. Cost To D/{e ........ NABORS 28 E 7 N/A Operation at' 0(~00 '' Lees CSg'. ' ..... Next 'Csg. ' ....... Shoe Tees RIH 133/8 @ 3149 95/8 12.4 MUD DAT'A ......... i~t:1' DATA .... MUD LOG DAYA DRILLING DATA FIoL u.a typo POLYMER UBT 20 .it ,o. 4 3 O.,th D.pth Wt. ......... P.U." 9.'0. W. lght 9.9 Ppg pH 8.8 S~=. 12.25 12.25 U,d Wt. ppo wt. ~<, wt. ................ AVg.' .... Me;,. ' ' ' W,co.lty 48 '" Pm .2 U,k. STC STC Fo,m,,o, WL K~ W,. ....... T'rq. Trq, " ' ' pv/Y~= 8-19 Pi .1 Typ, F1CL FICL BG gee v Btm. It.lb.OII. It.lb. G.ls 12-48-54 U, .5 se,i.~ No.NB4623 NB4616 co,,. ,.e V ?.,.?.p Depth Oul ...... Pump No. I 2 Aa W.L, 6.5 cc Chlorldel 2100 ppm uD/Zvo 9830 9665 Tr~p g,e ............ Liner Size HTHP 100 p,I o¢ o, 1 ~ Footege 165 2547 u,x. eGG v .... BPM HTHP 800 psi cc ow, 1-91.5 ADT/AST 1-1.5 26-8 CC Ezpo,e,t . . ..... RPM GPM So,ds 7.5 ~ ES T.b~.~Ut, 100-90 100-90 Sh.~o density , , wOe ..................... S,.d .25 % LG$ 3.1 ~' U~../U., 30-50 30-50 Eat. pore press. 'blow Pump Dale Hole VoL 1356 ..I. Pit Vol. 480 bbl. Jell'ri'FA .65 .47 ROPlSh-le Iph Slow P.S. D.W Mud $ 7413 Tot.I Uud $836681 Bit cost 10978 ':~{'09'78 Rop/s.,, Iph sio,, " O.,, ! I I ! t ! "'°""°"' ........... (h,s/,e,.) 1400 HRS 7'11-91 Gr,,. I I! I. I ! ................... Surv. Ho. Depth (MD) Angle ........ Direction ....... T.V.D. VetS. Sec. North/South ............ EaetlWest iDog Leg Acci;:lent? (Y/N) "l~i'im* ....... IEmplo'yer .... "' "'' "lRpt. Filed? (Yi~l) ...... Time Hours Code Operations From 0600 . 0600 ....... , .... , ,,,,, ,,, 0600-07.0.0 1 }: CONTINED TO CIRCULATE. HI VIS SWEEP BEFORE. pOOH 0700-0730 .5 t"~ DROPED SINGLE SHOT SURVEY PUMPED PILL 0730-1130 4 PULLED OUT OF HOLE 1130-1300 .5 L/D DOWN 3/4 DEGREE MOTOR AND P/U I DEGREE MOTOR. P/U ANADRILL .................. TRIPLE COMBO LOGGING TOOL L/D MWD. RIH. TESTED ANADRILL TOOL 1300-1400 1 CUT AND SLIP DRILL LINE 1400-1700 3 CONTINED RIH WITH BIT # 4 1700-2130 4.5 DRILLED FROM 9665 TO 9830. AST=I.5 HRS. ADT= 1 HRS. ANADRILL DID NOT , ,,,, , ...... , ................................. WORK COULD NOT GET CORRECT SURVEY. 2130-2300 1.5 CBU 2300-0200 3 POOH FOR ANADRILL , , ,! , ,, ........... ,BHA ~"i~¢riptio n: ,r . BIT # 4,1 DEGREE D~ O,FLOAT SUB,NM STAB,2NMLCS,NMST ANADRILL TRIPLE COMBO TOOL ,L .,,. : ,, ...... ~ ' "' ........ , ,,, ' ' ' '~', ' , ,, , ,~ ,; -': ," '; ;" ' ' ' '" ' ' NMSTAB,NMDC,NMSTAB,3NMDCS,STAB,JARS,SDC,XO ~HA No.: "' Drillplpe D~tl"~rop To BottOm) 5 ob weight' Gra~'~l '" Connecti~n ...... C'i'ael Length Bi'lA'"Length: 937 .... ~;,., 21'.9 .... p~.105 41/2 IF pREM ,,,, ,, ,, , ,, , Date" Ll~l Inspected: 7-9-91 Ho~J'r~ on Jars: .... 103.2 ,, ',, ,', .., . ,., ~ ., .; ;,.~ ,,j.;io. o,t'" '" " Fu;,, ~'W.~;,, ' '_ ,9 ] '" I 19913 Fu,."U,;;d ' ' Injection W'eil: PI~t Flli;: Praaeur~t: Fuel On' Loc'atiO'h 3698 ,, ,. ;Source: '' ' Volume: " Type Fluid: Fuel n"=.iv.d 10084 Fu.i Sou,c, BPX I ' Drl. Water On Location Drl. 'Water Uaad" ........... DrL Water flecelve'd .... OrL Water 8cures.... 440 PUT #27 PIT ..... ~ot~bla 'Wai'er On Location" 'olable Water ILIied Daily Volume: '" ~'~mulativl Voluble: ~otable"Water Received Potable Wlttr Sour'el 0 950 . 110 MCC _ Cutting Dali " .....' W~athe~ Data ...... '"' ........ Personnel' ~' '"" ' ..... Se'lely/BOP Data Daily:77 Te'~pereture 3 4 PB'D I 'Leal BOPE ~eat Leer'BOP D~r~ll ~,;17-91 7-20-91 Cumulative ..... Wind'~peed " C'0n{'r'ictc)'r 'Leat"H2e D " Leal Fire Drill 2040 CALM 30 7-1.?:91 7118191 Storage Silo: Chill Factor ' Service ILeal Safety'[MI~ Last Spill Drill L-1 RES PiT 34 1 4 7-20-91 7,20:91 W~ll Hame Data:' Other ' Spill (Y/N) Volume (Gala.) PM # 13 7-23-gl N N/A Sig'~led: T~tal 'Type Spill '' Report Fileo~? "' ZELJKO RUNJE 4 5 ..N./A N/A "Time '" Houre C'ode ........ Operatlone From' 0600 To 0600 0200-0300 1 CIO ANADRILL MWD PART OF THEIR TOOL. CIO BIT # 4 DUE TO ALL SEAL FAILERES .......... , , , . ........... RE-ORIENT AND RIH 0300-0600 3 RIH W/BIT # 5. ,,. ,, , ,, .... ,. ,, ,,, , .,,,, ..... , .... , .......... ................ · ........ .......... , ............ .............. ,, ..... pradhoe Bay Drilling ,~-'- --,~, Daily Drilling Report , , Since ......... ,-.o. ...!""".°' !°''' ..... .... I""' "1 . . 900 W';il Pt. MclNTYRE #13 Depth lUDrrVD) 9665-6612 [P,.v~o,,. Dop,h (,D) 876 Co~irlciol ........... Dally Coal I/~.m_ ~.~,~l ' Esl. Cell To Date NABORS 28 E N/A Oplreti'on at '060t~ ..... Lest Ceg, Next Csg. Shoe Teat CIRCULATING 133/8 3149 MD 95/8 12.4 EMW ' ' MUD DA'I'A '" BIT DATA UUb'£bG"~A]'A DRILLING DAtA p RoL U,d ry,. OLYMER aCT 21 ,,,o. 3 Depth Depth 9665 wt. 185 ......... P,U. ' ......... s.O'. Welghl 9.8 PPg .H 8.8 Siz. 12.25 U.dWt. PPO Wt. 275 KJ Wt. 140 .......... , Avg. Max. Vlacoetty 50 sec Pm .2 ,,k, STC Fo,me,°, Wt. 90 K# Wt. 110 ..... Trq. 'Trq.' ...... ,V/VP 8-17 ~Pl .1 ~YP' F1CL aG gee v Sim. ? It.lb. O.. 23000 It.lb .......... v pump Date Ge~. 11-50-55 ~'" .6 So,~., ,o.NB4616 Con,,. · ' Depth ~)ul ..... Pump No. $ 2 AP~ W.L 6.8 cc Chlorides 1800 ppm UD/TVD ? 'trip g... ,, · . .................. Liner size 6 6 HTHP ~00 .*~ cc O. 1 ~ Foot... 2647 U...~ ......... epa 8.5 8.5 HTHP 500 p,I ¢~; OWR 1-92 ADTIAST 26-8 DC E,ponent " Rea ......... Gpu 357 357 Solid, 7 % Es T.ble/Utr 100/90 Sha~' den,lty ...... ...... W'O"a ........ Preee, ure '~ ,,,~(::~ 0 S,.d .25 % LG8 2.9 ~' ,~n./U,. 30/50 Eot. pore p ..... Slow .......................... Hole VoL 1329 bbl. Pit VoL 500 bbl. Jete/TFA .47 .OPtShale ,ph S~ow p.s. 45 45 o,,y Mud S 15671 Tot-,..d $ 76268 s, coat 10978 ReP/Sand fph Slow P.P. 500 500 .,. A-.., ~',,,'1 "I I '1 I I "'~'"'"e" .......... ,h,e/d.te,1400HRS7/ 1/9 "'"' ,11,1 II!. N/A s.,,...o. 3 8 3 9 4 0 41 ........ D, pth (,D~8801 9053 9306 9557 ^..i. 53.8 53.2 52.8 51.7 Dt~,Uo, N62.SE N63.SE N65.6E N66.3E ]'.V.D. 6090 6240 6392 6546 v.,t. s.c. 5677 5880 6082 6280 ,°,h/So.th N 2594 N2685 N2771 N2852 E.et/Woat E 5051 E5232 E5415 E5596 .......... Dog Leg .49 .40 .59 .49 Time Hour~ Code Operetlone From 0600 . 0600 ....... ,,, , ,, , ..... 0600-1800 12 ~ DRILLED FROM 8765-9352. ADT=8.75 HRS AST=.75 HRS 1800-1930 1.5 I CIRCULATED SWEEP FOR SHORT TRIP , ,, , ............. 1930-2030 I SHORT TRIP TO 8200 FEET. NO TIGHT SPOTS OR FILL 2030-0530 9 CONTINUED TO DRILL FROM 9352-9665. ADT=3 HRS AST=5 HRS 0530-0600 .5 CIRCULATED SWEEP WILL POOH DUE TO BIT//3 BEING UNDER GAUGE , ,,,, .... ,, , ,, ,,, ,,, .......... ,, , ,, , ,, ..... , ...... , ....... ............. , .................. ,,, , ,,, ............. //3 BIT,3/4 DEGREE D, f~lA DRILL,X/O,FS,NM STAB,2 NMLC,NM S i ~3,MWD,NM STAB,NMDC,NM STAB 3 NMDCS,STAB,JARS,SDC,X/O BHA No.: " Driilplpe Detl (Top To 'i~otiom') ........... 4RR oD ' , 'Weight Gra~e ......... Co'nn~ctl~n ..... Class Length_ , , ellA' Length: 929.97 5" 21.9 G-105 41/2 IF PREM 8705 D~le' Laik In'eF~eote~l: ........ 7/9/91 H~ura on J~a: .............. 96 .., , :. , .. , .. ;: .,.., . .,.J ........ ~... . .... ,... , ................... , .. Injection Data Fuel & Water ,.j.ctio. w.,,: PM #9 IR,,.~ ..... IP,...ur.: ' Fu., On Loc;ilo. 17395 Fu.l'U.'ed .......... 4382 Source: Volume: Type Fluid: Fuel Received I~:uel' Source 0 BPX ........................ OrL' W~ler'On Location' Ori. Water Us'e~l "' ....... Drl. Walelr' Received Drl. Water SOurce 11 O0 PUT #27 PiT '" Potable Water On Locallon ........ ~otabie Water Ueed Daily Volume: ..... ~-umul~tiv~ Volume:' Potable W'ale'r Received ' Potable Water S(~'urc'e " 0 950 110 ,.,, .,,,i :i~, ,,. ,, ,: MCC " C'utting"'Data ...... ' ' Weath'er Oa'i'a ...... ' " ' .... Per'eonnel Salary/BOP Data Dali;: ' ' ' 238 Temperature 44 pa DRLG I I~et BOPE Teat Last"BOP Drill 7/17/91 7/20/91 Cumulative ...... Wind 9Feed Contractor Last H2s Drill Laet Rre Drill 1963 W 4 KNOTS 30 7/17/91 7/18/91 ~to~l~ Site: C'hlll Factor " ' Service Last'Safety Mlg Last SPill Drill L 1 RES. PIT, ,, 40 1 5 7120191 7/20/91. W.ll ..m. PM #13 D.t.: 7/22/91 Otb., Spill (V/N) Volume (Gals.) N N/A 5igned: ................ Total T~pe'Sp'lll ' Report File'd? .... ZELJKO RUNJE 46 N/A N/A Time Houri Code ........... 0'pe'~tiona From 0G00 T~ 0600 ..... ,, , ----', .--- Daily Drilling Report BP' Exploration , ~ ~ ~ I"'" "°' ' !, , -, - , , ,'1'"""'"' '~ '" ' ' Oeplh (MD/TVD)~ ~ ' IP~evtou~ Oepl.h (MD) ~ Contr.ctor ' Dail'~'Co~t _ ' ICum. Est. Co'it To Oa~e/ 4 " ~/~ "' M'UD"~ATA ...... ~T DATA MUD LOG DATA ~ILLING D~TA ,~ '~,~, ...................... ........... Avg. r,m" I ....... , ...... ~ Pump Dala ..,. ~ t / ¢o/s ~ ., . ,.,,., .o. m G ~14 ~... ,.. ~...... Depth Oul ............. Pump No. I 2 ...................... Liner .,.. ,oo .., - ow. I I, ~ .o.,... I~)v .c Exponent ......... ~1.101 ~ '" ... Rig ,.,.,..,., I~oo.[~ 7/n/ql """ I I I I I I .,.,. I!! II! , .. , , , , ........ ,, ,, .-- '*'""""'""' ~ I"'" ..... ~ I""0'" ~ I"'"'"";'%' .... , .... ,, Time Hour. Code Operatlon~ From 0600 - 0600 ,, ..... · , , , ,, ,,, ,, , , , ......... ,,,, , ,,,,,, , , , , ,, .... , , . Drillpipe Dal~ ~op To Bottom) Data Last'lnsp,cted:: ~ " . . F-~-'~/ ........ Houri on Jarl: .......... ~ ..... , ..... ,, ,,,, ..... ,, ................ ~.,u..: ,,,.,,u,,: '""""""' ~ '"'"" %~X ........ '" Dd. Waler On Location Drl. ..... poiahla 'WaIa~ On' Loc~lion Potable W~[er U~ed Daily Volume: cumul~live Volume: Potable Water , ,, ,. , ,,, , , , ', ,;., , Cultin~ D,I~ ' Weather Dat, P~r~onnel 5alety'/BOP ............. L,~I BO'P Drill Time ' Ho'~' 'C'o~e .... ~per~tlon~ From 0600 To 0600 ...... ,,, , ........... .., ..... . ...... .... ,. , , ,., ,,,., , , ........ ..... I ...... , ,, , ,, .... ....... , , , . ,,,, Bp Exploration ~' Daily Drilling Report F''"°' i8, /,o I No. ; '" ID,Y, Since' ~Pud/Ell Init ' w.. 1~ · ~3 I ~/~ /~~' ~ '~7~/ ~~ ' ~ Dail~"~0tl ' ~Cum. Cotl E~I. C0~l To Dale ...... so . q~/~ ' MUD'DATA ~T DATA MUD L~'"'DATA DRILUNG DATA p.u. s.~. '" Avg. .... Y~q. ,, , , Pump Data o.,. ~% -, . ~ ~..., .o, ~~1~ ~ ~ 3/~ co... ~.. . , ,, Depth Oul ~ ~ ~ Pump Ho. 1 2 ...... .... .~.,,oo,., ~ ooow. ~/~ ...,-. ~/~/~ ~/~,1~ ~ ~.., "~" ~ ~'~ ,,, ,, , , , ,-,~ / '-'~ Hole VoL q~O bbl. Pit Vol. ~O bbl. Jets~FA ~'~3 '~ ~. .~ "OPIShale Iph 8'0. P.8. , ,., ., ,. ..,.,..... /5oo o/./q; ~,..!1 !,,II! .... ,, ,, ~.~ o.~o o.e~ o.~ o.~l o.~o ,, , , , ~Ime HeurI Cede Oper.tleni From 0600 - 0600 ~ $~9~ ~ ~ ~ ,( ~ ~:~' To ~s-~9 - . ' ' ~ 7 I , ............... ·,. ' .... ~ · ". T ~ '~ " ..... Drlllpipe Data (Top'To Boiiom) " ,HA'.;:: LI- '~, 9.. ' ''OD "warm O,.d. Co...o,o. C,a,. El H,l~' Length: .................. ~ ,, O~l~' Li'~I I~.'p~Ole'd: .................... ,, ,, ......... H~';~ on jar.: ..... IiI I iiI1~ .............. i I II ii i .... I i ii i .......... i , ,; ~ ;" ~nie'~tio~ Dar. Fu~I & Wirer InjeC~On WIll: ~ ' ..... Fuel O~"'Locetion Fuel' U~ed "~ . ' ' ' ...... Volume: .... Ty~ Fluid: Fuel Received Fuel ....... Ioiol , ,,, , .... , , ~ ~ t ~ ~ L O ~ ~ O O,l:' Wa~r On LoCation Drl. Waier ................ ,, , ~o ....... Polabl~"'Wiler On ~oc~llon ~olablI WIItr UIId " ' Dally Volume:' " Cumul~tive Volume: P~{;ble Water Received Potlble' W~ler ................ ' ...... ,,.. ' ...... .. ' L ',,:, ,, ,, ,. ,,, cUtti'Ag Dali Weather Data ''~ Plrlonnel 9';flty'lB~ Dali ' C'AIII F~clo; ...... L.~l'S.l.ly'Utg ' " Well Hame Date: '" other 8pill ~Y)H) Volume'(Gil&.) ............... ....... Ti~e Hour8 Code ............. Oper~tion'8 From 0600 To 0600 ......... ~oo'~ ij(~ , ....... ~o ~//~. i , , .... ., , ,, . ............... .... Xl .................. , ................. ', ....... ,,, ........... ,,, ~ .... , ...... , ...... ,,, ...... ,,,, , ........ ..... , , ,, ......... ...... , .... ....... ARCO Alaska, Inc. Daily Drilling Report ,i._,' '~Dale7/ I'~"Z3/' ' I''~a'sS'"ce S,,,~,,s,.~ .. I~SU"v''"'~':~ ...... [~5~th J'~revious D~h (MD) I Progress I ~1 ~ [ Cum ~ s~ , j Esl. Cost To Date ' ~ 'v ..................Cs ~ ' lLasl Csg. Z/ ~ ~/ Shoe Test Bit DATA ;;;;2T,5- Viscosity A.,w.~_./7-:? cc HTHP 100 psi ~ cc HTHP 500 psi .... cc Pm Chlorides .~a ~ own ,~3 '7 Solids 3 qb ES , Sand ~ % LGS ~ Hole Vol. ..-------_. bbl. Pti. Vol. ~_~ ~:::~ bbl DailyMud$ ~'?~'~ TolalMud$ ~r~l~.--.- Rig Accept I I-ITc- II. I hrs. / rpm Depth Mud Wl. ppg! P.U. Wt. FornlaJion i BG gas C. orlrl, gas U Roi, Depth WI. K# K# K# WI. Avg. Max. K# K# Drag. Drag. Trq. 'frq Il.lb. ti.lb. Btm. Oil. Pump tala l,ip ~]as '~. j ',t 11. Max BOO ~, __ hfs DC Exponefrl 2 fpm %hah. don';lly Ku Esl pore pless. Iph flOP/Sand lph lhq Release Stow Pump Data spin psi Surv. Depth (MD) Angle Direction TV.D. Verl. Sec, Norlh/Soulh East/West Doq Leg Time Operations From 0600 ~ 0600 ~ '~ARCO Alaska, Inc AFE No. No. ~ J Rpl. _ . :-~'Date //1 ~ / I Days Since SpudlEsl, .~ J Supv. Intl. ~)/ I I I .... ~/rbe~t~ --- ) ...... ~ I Previous D~lh {MB) J Daily Cost --~--~ ....... T~. ,,T C,..si - /Last Csg. ~' t I Nexl (;sg.~ ...... BI [ DAIA MUD LOG '~TA Daily Drilling Report I Progres.~ Esl Cosl To D~le'~3~ Shoe DRILLING DATA Weight ~" I ppg pH .... PI . Chlorides /~ iii .... H~HP 100 psi ~ . cc Oil HTHP 500 psi ~ cc OWR ~/~ Solids ~ % ES Sand . ~ % LGS ~Z ....... ........ Rig Accepl Su[v No. Depth iUD) An!ih` Direclion T.VD. Vert. Sec. North/South East/West Dog Leg Time hrs. Deplh P.U. S.O. WI. Max K# Drag. 7rq. Trq Btm. &(:~lb' Oil. ~'~ ~? ~ Corm gas u" ~ Pump Data ................... I'~ump N(~ I 1 '-' ...... -,l'~- Liner Size I ~ ~7~ ,, ~.x.~ ~" .....I ..... q:.- B , I ~ densily .......... I ........... I<.Esl pore press. ' Slow Pump Dala I_~t~ ...... , I1OP/Shale Slow P.S. spin ~ lletease fi.lb. 2 spin Operalions F~om 0600--0600 O Alaska, Inc. ~ Daily Drilling Rep. D,_ No. I Dale / --lq / I Days Since Spud/Esl. I Supv. Init. Operalion at 0600 I t.asl Usg. I ~ H~xl C~g. ~' --I ~T DAIA ..... F~U~TO~ DA?A" I OnlLLIN~ DATA HTHP 100 psi .... cc Oil ~ oh ttIHP 500 psi .------- cc. Solids 7 Sand, Hole Vol, '"'"' ~ ~_~ bbl. Daily Mud Pit. Vol. ~"'~:~ bbl. ,o,., M.,,, ('5 Dr, plh I II. II.I.la× BGG u .................. D~:A;~% ~ ,, .... '""'"'"'"""', ~ K# E~I porn press .......... ;JS~- ~ nOP/Shale ~: . fl( )1 Deplh P.U. _ --K# ~.0. w,:/,2~"'- ~,. / lo K, Avg. ~ Oax. Drag. K# Drag. K# frq. ~ I Trq. u Blm.'~~b' Oil ti.lb. PumJ Dala PlesstlrO I [ph s~m ~pm h,hll SI,~ PP p,, II f~i~ IlelPase Surv. No. Depth {MD) Angle Direction TVD. Vert. Sec. Nor Ih/~,~'~ East/IAl~t Dog Leg Time Operations From 0600- 0600 ~CQ Alaska, Inc.v'~' ~ ' DaiiY Di'illing' Report Daily Cost ~_ / [ Cum. CO~ Est. Coat To Date' ' Co.,ac,or ~~: ~ ~ ~,oe Operation al 0600 C ~ /~ ~ MUD DATA BIT DATA - MUD LOG DATA DRILLING DATA Mud type MBT ~ Size ...... P.U. S.O. Weight ~:~+ ppg oH ~~ /Ty~ ~~ MudWt. 000 Wt. /,~K' ,,. Make - - ' i Avg. Max. Viscosity ~ sec. Pm * I flT~ Formation Drag. ~ K, Drag. Type ~ I Trq. Trq. Pump Data Serial No. Conn. gas u c Chlorides /q~ ppm MD~VD ~ ~ ~ ~, Trip.as i~ LinerSize /. in. Z in. Footage ~ u "'"P500ps' ~ CC OW" ~ O//:~hrs'.7~,~:- DCExponen, GPM ~4~ ~~ RPM t ' ' Solids ~ % ES~ WOBTable/Mtr ~}~ ~ ~ rpm I rpm Shale density Pressure ~/~ -- Jets~FA ~--~ nOP/Sha~ fph S~ow P.S. spin spin ,oleVol. ~ bbl. PiL Vol. ~~ bbl. Bil Cost ROP/Sand fph Slow P.P. psi psi DogLeg 2.12 617 2,7~ ~.~ a.~~il.- 2~ Time/ Hours Code Operalions From 0600- 0600 ... ..... ARCO Alaska, Inc. 'O ,.,o,*y ,.-,,,,,,,~ ,,--'P--.- ..... - .... BIT DATA .... MUD L~,~ DAT~ DRILLI~G DATA ' ' Size.. -- P.U'~ '- Max. Viscosily sec. Pm Formation , Drag. Drag. . ~ ~ .. [ype Gels MI ' Conn. gas u -- · , ,, '" Dept~ 0ul ........ Pump No. 1 2 ...... Liner Size ~ m ~ in HTHP 500 psi ~ cc OWR hrs. h~s DC Exponent -- - . , - GPM nPu 7~ X~7o wo. Sand ~ %LGS Min./Max. ~ ~ K8 I K~Esl. poro press, SIo~ Pump Data ............ deisg~A ' ~t Cos~ ' ~ ' " ..... Surv. No. ............................ Deplh (~D) ...... Angle ............ Direction ............. T.V.D. .......... Verl. Sec. Norlh/Soulh ..... EasllWesl .............. Dog Leg , I, ~ : ,,: ,,, ~ ,. .......... Time Hours Code Ope~alions From 0600 - 0600 ...... ~-~ ~ ~__~ ....... ~- ~/~ c ~ ....... , _. ~ .~ ~ ~. ..... ~ ''~.' ~ ~ ' ~ , ', o , Alaska, Inc.~ ,,," ~ ('~ Daily Drilling Report I""'''°' 7:' 1 I I ~ontractor Daily Cos~ _ I Cum ~t ~ Esl. Cost To Date I ...... Operation al 0600 Last Csg.. Ne~s~____.~ Shoe Test ~/~__ MUD DATA BiT DATA , MUD LOG DATA DRILLING DATA Bit No. ~ Rot Mud type ~ ~ MBT~ Deplh Deplh Wl, K~ s.o, Weight I O PPg pH ~ ~ [__.~ Mud Wt. PPg Wt. Make Avg. Max. Viscosity p ~ ~ sec. Pm ~T~ Formation i Drag. K~ Drag. K~ Type ~ Trq, Trq, PVIYP ~0 ' ' Pf NF~5~ BGgas u Btm. It.lb. Off. It.lb. Serial No. Pump Data Gels ~, L~' Mf ~%~ Iq~ Conn. gas u Deplh Out. Pump No. 1 2 APl W.L. O~T cc Chlorides ppm MD~VD i i hip gns (,~ u Liner Size ~ in. ~ in. Footage ~' f HTHP 100 psi cc Oil % fl. ft. Max BGG ~ u ADT/AST ..... SPM HTHP 500 psi cc OWR / hrs. hrs DC Exponenl RPM GPM Solids % ES Table/Mir t rpm / [pm Shale density Pressure web Sand % LGS Min.IMax. I K~ I Kfl Est. pore press. Slow Pump Data "oleVol,~g~ bbl. Pit. Vol. ~O bbl- Jets~FA ~ } ~ ~ ~ ~ ROPIShale fph Slow P.S. spm spm B~t Cost ~ O~ ~ Daily Mud $ ~0~ Total Mud $ 3~ 0~ ~ ROPISand fph Slow P.P. psi psi RigAccept ,Dell III !1 Rig'Release Surv. No. , , Depth (MD) Angle Direction T.V.D. Vert. Sec, North/South East~est Dog Leg Time Hours Code Operations From 0600- 0600 , ARCO Alaska, Inc .~, ~ Daily Drilling Report Operation ,,0600 ~ )CC~ ~ ~ i)a~O~ ~ ~/4 q NextCsg. q ,/~ Shoe Test MUD DATA BIT DATA MUD LOG DATA DRILLING DATA ~ Rot. M~d type ~p ~ MBT ~ ~ Bi, No. ~ Depth Depth~ /~ Avg. Max. Viscosity h ~ sec. Pm ~- O Make ~ ~ Formation PV/YP t 0 / J ~ Pf . ~ Type I Trq. Trq. ~ FD 5 ~ C BG gas u BIm.I Z OO~'lb' Off. / fi.lb. .. Gels ~ O J~O ' ~ ~ M, ~. [ Serial ,o. lC S ~ I ~ ~ Co,,. ,,, Depth Out Pump No. 1 2 APl W.L. [ ~-~ cc Chlorides J ~O O ppm MD~VD ~l ~ I I Trip gas ' Liner Size ~ in. in. HTHP 100 psi ' cc Oil ~ % Footage J~ ~ ~ ,. ft.Max BGG ~ u ,, SPM Solids ~ % ES ~ RPM TablelMtr I I O I ~ ~rpm I rpm Shale density WeB ~ Pressure ~ O Sand ~ *~ % LGS ~*~ O/O Min./Max. ~ ~ / ~K~ I K~ Est. porepress. SlowPump'Data .oleVol. ~ bbl. Pit. Vol. ~O bbl. Jels~FA . ~ ,OPlShale ,ph SlowP.S.~spm ~ ~spm Bil Cost ~j ReP/Sand fph Slow P.P. ~OO PSi ~OO pm Daily Mud, G ~ ~ Total Mud,~ 5 %0 ~0. ~ O' I , Depth(MD) 5sq~sq 3~ T.V.O. ~qq 50qS'b~g~ Vert. Sec. I~J J~O J~q East/West I1~ i5o~ ~%1 Time Hours Oode Operations From 06~-0600 ~>o J ~~ ~g ~CLp ~oN~ o~ ~[I~C/~ 1~30 ..... ,~>~ ~ hl....~ ~.~~ ,, ........... , Daily Drilling Report Well Depth ~. /. / _ _ I Previous ?epth (M.D) I Prog.~e Conlractorg ~ ~ ~4~O~S . D~ilv~n.t .-- ICum Cost I.., ~ostT~D~e~ Last Cs ' ~ ~ U' ~ Ne;t Csg~ ~/~ I Shoe Test Operation at 0600 O [ I LC ~ ~ ~ ' --'-- ~ ~ ~ ~ATA ~ U,'L-~ "-- ' -- ~ ~5~ . B. No. Rot. Mud type~L~~ MBT ZO ~ Depth Depth~~ Wt. Size [~ P.U. S.O. Max. Make i Avg. Drag.~~ K~ Drag. v,~co~,~ ~ o sec. Pm ' % ~T~ ~orma,o. Trq. Trq. PV/YP ~ / I ~. Pf · ~ Type ~~ BG gas u Btm. I~OOO fi.lb. Off. / fi.lb. Serial No. Pump Data ~.,. ~ /~o, ~ ~, ~ ~/~ c0,,.~, u ' Pump N0. 1 2 Depth Out Trip gas ~ u ~PIW.L. ~.~ cc Chlorides ~OOO ppm MD~VD 5~ I I LinerSize ~ in. ~ in., Footage HTHP 100 psi ~ cc Oil ~ % ~O ! ~ ft. fl, Max BGG u SPM ~ ~  ADTIAST HTHP 500 psi ~ cc OWR ~ W~ ~11[ I ~ ~ hfs. hrs. DC Exponent GPM ~? ~ RPM Solids ~ % ES ~ Table/Mir IOO / ~O rpm / rpm Shale denslty ....Pressure O~O WOB s~.~ · ~ % L~S ~' 7 M,n.~Ma.. 3 Y ' ~ ~ "" ~ ~, Es,.,or~,re.,. S,ow Pump OailyMud$ ~1%~ T°talMud$~2 ~1 BilCost ~O~~ ROP/Sand fph SlowP.P. ~O~.si WOO ps, DogLeg 1.32 1.1~ O.q3 0.gq o.%1 Time Hours Code Operations From 06~-0600 O~OO o~o t~l~ ~~vEg / cc~~b cc~ o~T oF 9os5~ fla-cc~e-S o t~ CoPT'~ ~ ~,LL ~~ 46~O ~o ~3) 5lib - 5 UR£A ¢£ DIRECTIONAL SURVEY [-~ UIDANCE ~ ONTINUOUS [~ OOL REC£1VF..D ,JAN ) 1 199~ Naska Oil & Gas Cons. Gom~'tss~ ~ohorage Company Bi> EXPLORATION Well Name PT. MCINTYRE #13 (520' FNL,4257' FEL,SEC 14, TWN 12. N, R14E) Field/Location POINT MCINTYRE, NORTH SLOPEr ALASKA Job Reference No. Date 74847 11-AUG-91 Loqqed By: Computed By MCBRIDE DEES I I II I SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH SLOPE, ALASKA SURVEY DATE: 11-AUG-1991 ENGINEER: M.MCBRIDE METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION; TANGENTIAL- LINEAR HORIZ. DIST. AverageO Oeviation and azimuth PROJECTED ONTO A TARGET AZIMUTH OF NORTH 62 DEG 57 MIN EAST COMPUTATION DATE: 20-AUG-91 PAGE BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY: Il-AUG-1991 KELLY BUSHING ELEVATION: 39.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTh DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WESl DIS}. AZIMUT~ FEET DEG/IO0 FEET FEET FEET DEG 0 O0 100 O0 2O0 O0 300 O0 400 O0 500 O0 60C 700 O0 800 O0 900 O0 0 O0 lO0 O0 200 O0 300 O0 4OO O0 500 O0 600 O0 7OO O0 799 99 899 85 -39 O0 61 O0 161 O0 261 O0 361 O0 461 O0 561 O0 661 O0 760 99 860 85 0 O N 0 0 E 0 4 S 75 36 W 0 6 N 24 50 W 0 7 N 54 48 W 0 6 S 49 50 W 0 6 S 8224' O 4 S 40 34 E 0 6 S 35 59 E 1 41 N 63 57 E 4 13 N 64 56 E 0 O0 -0 O1 -0 06 -0 08 -0 24 -0 37 -0.4O -0.37 0.84 5.88 0 O0 0 O0 0 O0 0 O0 0 O0 0 O9 00i 021 221 3 21 0 O0 N '0 O0 S 0 07 N O 23 N 021 N 0 06 N 0 07 S 0 19 $ 0 24 N 2 45 N 0 O0 E 0 01 W 0 11 W O 20 W 0 38 w 0454 O 42 w 031 4 081 E 5 35 E 0 O0 N 0 0 E 01 S 75 7 W 13 N 57 0 W 30 N 41 35 W 44 N 60 42 W 46 N 82 13 4 42 S BO 54 4 37 S 58 21 w 85 N 73 18 E 89 N 65 22 E 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 999.32 O0 1098.15 1059 O0 1196.35 1157 O0 1293.71 1254 O0 1390.68 1351 O0 1487.49 1448 O0 1583.40 1544 O0 1677.21 1638 O0 1768.62 1729 O0 1857.95 1818 960 32 7 30 15 9 48 35 12 1 71 14 1 68 14 11 49 15 5 40 18 6 21 22 15 62 25 27 95 27 42 N 67 14 E N 66 27 E N 64 2 E N 61 10 E N 62 32 E N 65 0 E N 68 12 E N 70 19 E N 71 10 E N 70 46 E 16.01 31.19 50.00 72.81 97.22 122.27 150.47 184.82 224.94 269.42 291 1 49 2 92 051 0 59 2 04 4 37 3 73 2 84 1 18 12 20 30 42 53 64 77 90 104 14 66 E 49 N 28 32 N 45 99 N 65 60 N 87 69 N 109 88 N 135 04 N 168 30 N 206 64 E 31 76 E 50 93 E 72 41 E 97 88 E 122 82 E 150 19 E 184 46 E 225 92 N 248.94 E 270 16 04 N 66 4 E 25 N 66 27 E O7 N 66 3 E 85 N 64 50 E 24 N 64 1 E 29 N 63 58 E 52 N 64 28 E 99 N 65 23 E 34 N 66 23 E 14 N 67 9 E 2000 O0 1945 69 1906.69 30 6 2100 2200 2300 24O0 2500 2600 2700 2800 2900 O0 2031 O0 2114 O0 2195 O0 2273 O0 2348 O0 2421 O0 2493 O0 2562 O0 2629 08 1992.08 32 21 50 2075.50 34 41 26 2156.26 37 36 28 2234.28 39 50 69 2309.69 42 3 86 2382.86 43 50 13 2454.13 45 23 14 2523.14 47 9 66 2590.66 48 13 h 70 33 E N 65 31 E N 59 32 E N 60 24 E N 61 0 E N 63 57 E N 65 11 E N 61 42 E N 60 22 E N 61 14 E 316.95 368.70 423.80 482.66 545 16 610 80 678 90 749 03 821 34 895 05 3 15 4 80 3 13 3 O0 2 55 3 66 2 63 2 54 061 1 94 120 75 N 294 22 E 318 04 N 67 41 E 139 165 195 225 256 285 316 351 388 77 N 342 64 N 391 42 N 442 92 N 496 58 N 554 20 N 616 68 N 679 92 N 742 02 N 806 62 E 370 27 E 424 15 E 483 75 E 545 81 E 611 66 E 679 33 E 749 52 E 821 85 E 895 03 N 67 48 E 89 N 67 3 E 41 N 66 9 E N 65 33 E 26 N 65 11 E 42 N 65 11 E 51 N 65 0 E 70 N 64 38 E 30 N 64 19 E 3000.00 2695 20 2656.20 50 2 3100.00 2758 3200.00 2820 33O0.00 2882 3400.00 2942 3500.00 3002 3600.00 3061 3700.00 3121 3800.00 3180 3900.00 3237 10 2719 10 51 47 33 2781 37 2843 44 2903 26 2963 71 3022 06 3082 31 3141 63 3198 33 51 17 37 52 22 44 53 25 26 53 6 71 53 49 O6 53 24 31 54 18 63 55 26 N 61 37 E N 61 26 E 1048 N 61 12 E 1126 N 60 55 E 1204 N 60 21 E 1284 N 60 34 E 1364 N 60 59 E 1445 N 61 48 E 1525 N 62 26 E 1606 N 62 50 E 1688 97O 54 26 50 89 76 82 17 62 17 10 2 65 1 14 0 48 1 55 0 11 0 5O 0 8O 091 1 74 1 40 424.12 N 873 18 E 970.74 N 64 6 E 460.97 N 941 498.74 N 1010 536.63 N 1078 575.92 N 1148 615.41N 1218 654.74 N 1288 693.30 N 1358 730.86 N 1430 768.67 N 1502 63 E 1048.41 N 63 55 E 19 E 1126.60 N 63 43 E 86 E 1204.95 N 63 33 E 48 E 1284.79 N 63 22 E 21 E 1364.83 N 63 12 E 34 E 1445.17 N 63 4 E 99 E 1525.62 N 62 58 E 25 E 1606.17 N 62 56 E 94 E 1688.10 N 62 55 E BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 20-AUG-91 PAGE 2 DATE OF SURVEY: 11-AUG-1991 KELLY BUSHING ELEVATION: 39.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTh DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 4000.00 3294 71 3255 71 54 39 4100.00 3352 4200.00 3410 4300 O0 3469 4400 O0 3532 4500 O0 3593 46O0 O0 3653 4700 O0 3713 4800 O0 3772 4900 O0 3831 79 3313 69 3371 88 3430 22 3493 31 3554 91 3614 9C 3674 32 3733 42 3792 79 54 33 69 54 48 88 51 49 22 51 29 31 53 9i 52 39 90 53 46 32 53 55 42 53 42 N 63 38 E 1770 21 N 62 54 E 1851 N 62 11 E 1933 N 61 50 E 2013 N 61 51 E 2091 N 61 37 E 2171 N 61 38 E 2250 N 61 44 E 2330 N 61 5O E 2411 N 62 5 E 2492 61 14 71 89 04 56 54 69 35 2 09 0 58 0 86 1 73 1 80 0 42 0 83 I 8O I 15 0 86 805 49 N 1576.33 E 1770 21 N 62 56 E 842 879 917 954 991 1029 1067 1106 1143 13 N 1649.03 E 1851 69 N 1721.39 E 1933 61 N 1792.50 E 2013 46 N 1861.45 E 2091 97 N 1931.17 E 2171 76 N 2001.17 E 2250 70 N 2071.60 E 233C 10 N 2143.10 E 241t 95 N 2214.34 E 2492 61 N 62 57 E 14 N 62 56 E 71 N 62 53 E 89 N 62 51 E 04 N 62 49 E 57 N 62 46 E 56 N 62 44 E 71 N 62 42 E 37 N 62 41 E 5000 O0 3890 37 3851.37 54 3 5100 O0 3948 5200 O0 4004 5300 O0 4061 5400 O0 4119 5500 O0 4177 5600 O0 4236 5700.00 4295 5800.00 4355 5900.00 4412 24 3909.24 55 21 84 3965.84 55 25 95 4022.95 54 56 72 4080.72 54 31 97 4138.97 54 15 70 4197.70 53 51 83 4256.83 53 37 13 4316.13 54 5 22 4373.22 55 44 N 61 49 E 2573 N 60 10 E 2654 N 59 31E 2736 N 59 36 E 2818 N 59 45 E 2900 N 59 40 E 2981 N 59 46 E 3062 N 59 49 E 3~42 N 59 46 E 3223 N 60 23 E 3305 62 92 87 35 51 32 84 24 23 0 68 2 09 0 75 0 O9 0 66 0 58 0 38 0 47 2 28 0 6O 1181 93 N 2285 63 E 2573 14 N 62 39 E 1221 1262 1304 1345 1386 1427 1467 1508 1549 13 N 2357 82 N 2428 43 N 2499 66 N 2569 65 N 2639 48 N 2709 95 N 2779 53 N 2848 44 N 2920 14 E 2654 25 E 2736 02 E 2818 46 E 2900 66 E 2981 54 E 3062 29 E 3~43 84 E 3223 01 E 3305 67 N 62 37 E 99 N 62 31 E 98 N 62 26 E 51 N 62 22 E 71 N 62 17 E 57 N 62 13 E 14 N 62 9 E 59 N 62 6 E 64 N 62 3 E 6000 O0 4468 81 4429 81 55 25 6100 6200 6300 64O0 6500 6600 67O0 6800 6900 O0 4525 75 4486 lO0 4583 21 4544 O0 4641 16 4602 O0 4698 33 4659 O0 4754 74 4715 O0 4811 68 4772 O0 4869 02 4830 O0 4926.95 4887 O0 4985.26 4946 75 55 5 21 54 47 16 54 28 33 55 44 74 55 21 68 55 14 02 54 46 95 54 33 26 54 11 N 60 24 E 3387 60 N 60 9 E 3469 N 59 56 E 3551 N 60 31 E 3632 N 62 19 E 3714 N 62 38 E 3797 N 6'2 27 E 3879 N 62 44 E 3961 N 63 12 E 4043 N 63 24 E 4124 72 46 85 86 43 64 56 08 31 0 72 1 28 0 50 2 32 1 40 0 18 0 67 0 38 0 30 0 26 1590 09 N 2991 75 E 3388 06 N 62 1 E 1630 1671 1712 1751 1789 1827 1865 1902 1938 81 N 3O63 68 N 3134 37 N 3204 34 N 3276 45 N 3350 37 N 3423 08 N 3495 10 N 3568 58 N 3641 15 E 3470 06 E 3552 68 E 3633 87 E 3715 12 E 3798 06 E 388O 79 E 3962 41 E 4043 O0 E 4124 23 N 61 58 E 03 N 61 55 E 48 N 61 53 E 52 N 61 53 E 08 N 61 53 E 29 N 61 54 E 20 N 61 55 E 71 N 61 56 E 92 N 61 58 E 7000.00 5044.11 5005 11 53 50 7100.00 5103.43 5064 7200.00 5162.79 5123 7300.00 5221.67 5182 7400.00 5280.42 5241 7500.00 5339.26 5300 7600.00 5398.42 5359 7700.00 5457.90 5418 7800.00 5518.04 5479 7900.00 5578.35 5539 43 53 31 79 53 36 67 53 56 42 53 59 26 53 58 42 53 32 90 53 19 04 52 40 35 53 26 N 63 38 E 4205 16 N 64 0 E 4285 N 63 22 E 4366 N 61 48 E 4446 N 61 54 E 4527 N 61 56 E 4608 N 62 14 E 4689 N 62 32 E 4769 N 62 48 E 4849 N 62 20 E 4929 65 12 94 84 69 30 69 58 34 0.80 1 ,04 2.88 0.35 0.36 0.87 0.70 1.16 0.59 1 .46 1974 70 N 3713 33 E 4205.74 N 62 0 E 2010 2045 2083 2121 2159 2197 2234 2271 2307 19 N 3785 48 N 3857 08 N 3929 22 N 4000 31N 4072 08 N 4143 32 N 4214 03 N 4285 62 N 4356 59 E 4286.20 N 62 2 E 92 E 4366.64 N 62 4 E 47 E 4447.46 N 62 4 E 83 E 4528.38 N 62 4 E 15 E 4609.24 N 62 4 E 39 E 4689.86 N 62 4 E 63 E 4770.25 N 62 4 E 59 E 4850.14 N 62 5 E 47 E 4929.90 N 62 5 E BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 20-AUG-91 PAGE 3 DATE OF SURVEY: 11-AUG-1991 KELLY BUSHING ELEVATION: 39.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTM FEET DEG/IO0 FEET FEET FEET DEG MIN 8000.00 5637.70 5598.70 53 35 8100.00 5696 96 5657.96 53 39 8200.00 5756 8300 O0 5815 8400 O0 5875 8500 O0 5935 8600 O0 5995 8700 O0 6055 8800 O0 6115 8900 O0 6174 35 5717.35 53 32 66 5776 66 53 30 12 5836 12 53 28 11 5896 11 53 0 50 5956 50 52 48 64 6016 64 53 19 01 6076 01 53 42 32 6135 32 53 25 N 62 3 E 5009 82 N 61 36 E 5090 N 60 3O E 5170 N 60 34 E 5251 N 60 42 E 5331 N 61 6 E 5411 N 61 27 E 5491 N 62 17 E 5571 N 62 4O E 5651 N 62 57 E 5732 35 76 20 53 49 16 04 50 02 0 64 0 28 0 76 0 19 1 15 0 68 0 62 1 3~ C 6~ 0 77 2345 20 N 4427 63 E 5010 38 N 62 5 E 2383 36 N 4498 2422 37 N 4568 2462 02 N 4639 2501 44 N 4709 2540 38 N 4778 2578.69 N 4848 2616.45 N 4919 2653.46 N 4990 2690.28 N 5062 57 E 5090 94 E 5171 01 E 5251 08 E 5332 98 E 5412 88 E 5491 28 E 5571 73 E 5652 33 E 5732 93 N 62 5 E 37 N 62 4 E 85 N 62 3 E 23 N 62 1 E 22 N 62 0 E 92 N 62 0 E 82 N 62 0 E 27 N 62 0 E 76 N 62 1 E 9000 O0 6234.12 6195 12 53 6 9100 9200 9300 9400 9500 9600 9700 9800 9900 O0 6294.15 6255 O0 6354.24 6315 O0 6414.46 6375 O0 6475.36 6436 O0 6536.91 6497 O0 6598.93 6559 O0 6661.74 6622 O0 6724.84 6685 O0 6788.35 6749 15 53 6 24 53 5 46 52 57 36 52 10 91 51 54 93 51 18 74 51 84 50 31 35 50 55 N 63 10 E 5812 17 N 63 20 E 5892 14 N 63 37 E 5972 07 N 63 49 E 6051 90 N 64 20 E 6131 20 N 64 43 E 6209 98 N 63 56 E 6288 40 N 63 34 E 6366.21 N 62 4 E 6443.78 N 61 25 E 6521.00 0 45 0 39 0 24 1 64 0 62 0 14 0 87 0 60 1 82 1 22 2726 61 N 5133 78 E 5812 92 N 62 2 E 2762 2798 2833 2868 2902 2936 2970 3005 3042 64 N 5205 33 N 5276 68 N 5348 35 N 5419 21N 5490 19 N 556t 61 N 5631 75 N 5700 5O N 5768 17 E 5892 70 E 5972 28 E 6052 61 E 6131 79 E 6210 49 E 6288 27 E 6366 43 E 6444 38 E 6521 88 N 62 3 E 79 N 62 4 E 59 N 62 5 E 86 N 62 7 E 6O N 62 8 E 99 N 62 10 E 77 N 62 11 E 33 N 62 12 E 57 N 62 11 E lOGO0 O0 6851 04 6812 04 51 8 10100 10200 10300 10400 lo5oo 10600 10700 10800 10900 OO 6913 OO 6976 O0 7039 O0 7103 oo 7167 oo 7231 OO 7296 O0 7363 O0 7431 76 6874 71 6937 94 7000 43 7064 36 7128 62 7192 52 7257 45 7324 16 7392 76 51 2 71 50 55 94 50 42 43 50 33 36 50 14 62 49 48 52 48 38 45 47 50 16 46 48 N 61 33 E 6598.88 N 62 4 E 6676.75 N 62 11 E 6754.44 N 62 24 E 6831.91 N 62 42 E 6909.16 N 63 22 E 6986.06 N 64 3 E 7062.68 N 64 21E 7138.73 N 64 49 E 7213.00 N 66 1 E 7286.53 0 66 0 27 0 95 0 50 0 17 0 44 0.95 2.98 0.71 1 .24 3079 76 N 5836 79 E 6599 48 N 62 11 E 3116 3152 3188 3224 3259 3293 3326 3358 3389 56 N 5905 94 N 5974 90 N 6042 55 N 6111 41N 6179 41N 6248 38 N 6317 51N 6384 12 N 6450 44 E 6677 09 E 6755 71E 6832 25 E 6909 79 E 6986 46 E 7063 02 E 7139 O0 E 7213 93 E 7287 36 N 62 11 E 06 N 62 11 E 53 N 62 11 E 78 N 62 11 E 67 N 62 11 E 27 N 62 12 E 30 N 62 14 E 54 N 62 15 E 02 N 62 17 E 11000.00 7500 17 7461 17 46 0 11100.00 7570 11200.00 7641 11300.00 7714 11400.00 7789 11500.00 7866 11600.00 7944 11700.00 8024 11800.00 8106 11900.00 8189 05 7531 58 7602 71 7675 28 7750 14 7827 31 7905 73 7985 72 8067 34 8150 05 45 21 58 43 15 71 42 47 28 40 32 14 39 16 31 37 36 73 35 23 72 34 39 34 33 35 N 66 58 E 7358 75 N 67 52 E 7430 N 68 30 E 7499 N 69 28 E 7567 N 69 46 E 7633 N 70 9 E 7697 N 68 43 E 7759 N 66 55 E 7818 N 66 56 E 7875 N 66 45 E 7931 06' 64 48 62 ~ 11 04 25 36 57 1 .27 1 .66 1.15 1 .O9 2.04 0.90 2.42 1 .35 0.16' 1 .79 3417 97 N 6517 30 E 7359 19 N 62 20 E 3445 3471 3495 3518 3540 3562 3585 3607 3629 47 N 6583 41N 6648 88 N 6711 96 N 6774 87 N 6834 57 N 6892 06 N 6947 49 N 7000 65 N 7052 33 E 7430 20 E 7499 87 E 7567 36 E 7633 46 E 7697 91 E 7759 92 E 7818 59 E 7875 38 E 7931 44 N 62 22 E 95 N 62 26 E 72 N 62 29 E 81 N 62 33 E 25 N 62 37 E 13 N 62 40 E 32 N 62 42 E 42 N 62 44 E 61 N 62 46 E BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 20-AUG-91 PAGE 4 DATE OF SURVEY: 11-AUG-1991 KELLY BUSHING ELEVATION: 39,00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 12000.00 8273 95 8234.95 31 5 12100.00 8360 12200.00 8446 12300.00 8534 12400.00 8623 12500.00 8713 12600.00 8805 12700.00 8897 12800.00 8991 12900.00 9084 03 8321.03 30 19 77 8407.77 29 1 78 8495.78 27 44 64 8584.64 26 46 63 8674.63 24 41 26 8766.26 22 44 88 8858.88 21 33 11 8952.11 21 13 26 9045.26 21 17 N 66 30 E 7984 75 N 66 8 E 8035 N 65 45 E 8085 N 65 42 E 8132 N 65 27 E 8178 N 65 35 E 8222 N 65 53 E 8261 N 65 44 E 8299 N 65 7 E 8335 N 65 12 E 8372 55 23 65 46 O0 98 63 77 12 1 .90 0.49 1 .68 0.94 0.97 2.72 1 .35 1 .58 0.55 0.87 3650 75 N 7101 32 E 7984 78 N 62 48 E 3671 3691 3710 3729 3747 3764 3779 3794 3809 16 N 7147 45 N 7193 96 N 7236 89 N 7278 70 N 7318 09 N 7354 47 N 7389 56 N 7422 78 N 7455 94 E 8035 36 E 8085 64 E 8132 41 E 8178 20 E 8222 73 E 8261 15 E 8299 02 E 8335 06 E 8372 57 N 62 49 E 25 N 62 5O E 66 N 62 51 E 46 N 62 52 E O0 N 62 53 E 99 N 62 54 E 63 N 62 55 E 77 N 62 55 E 12 N 62 56 E 13000.00 9177.38 9138.38 21 34 13100,00 9270.28 9231.28 21 48 13200.00 9363.09 9324.09 21 51 13229.00 9390.01 9351.01 21 51 N 65 0 E 8408.55 N 64 57 E 8445.53 N 64 59 E 8482.65 N 64 59 E 8493.44 0.23 1 .86 O.O0 0.00 3825.17 N 7488.11 E 8408.55 N 62 56 E 3840.88 N 7521.61 E 8445.53 N 62 57 E 3856.59 N 7555.27 E 8492.65 N 62 57 E 3861,16 N 7565.05 E 8493.44 N 62 58 E COMPUTATION DATE: 20-AUG-91 PAGE 5 BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH 5LOPE, ALASKA DATE OF SURVEY: Il-AUG-1991 KELLY BUSHING ELEVATION: 39.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUT~ FEET DEG/IO0 FEET FEET FEET DEG MiN 0 O0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0.00 O0 999.32 96O O0 1945.69 1906 O0 2695.20 2656 O0 3294.71 3255 O0 3890.37 3851 O0 4468.81 4429 O0 5044.11 5005 O0 5637.70 5598 O0 6234.12 6195 -39 O0 0 0 32 7 30 69 30 6 20 50 2 71 54 39 37 54 3 81 55 25 11 53 50 70 53 35 12 53 8 N 0 0 E N 67 14 E 16 N 70 33 E 316 N 61 37 E 970 N 63 38 E 1770 N 61 49 E 2573 N 60 24 E 3387 N 63 38 E 4205 N 62 3 E 5009 N 63 10 E 5812 0 O0 01 95 54 21 11 60 16 82 17 0 oo 291 3 15 2 65 2 09 0 68 0 72 0 80 0 64 0 45 0 O0 N 6 120 424 8O5 1181 1590 1974 2345 2726 0 O0 E 51N 14 75 N 294 12 N 873 49 N 1576 93 N 2285 09 N 2991 70 N 3713 20 N 4427 61N 5133 0 O0 N 0 0 E 66 E t6 22 E 318 18 E 970 33 E 1770 63 E 2573 75 E 3388 33 E 4205 63 E 5010 78 E 5812 04 N 66 4 E 04 N 67 41 E 74 N 64 6 E 21 N 62 56 E 14 N 62 39 E 06 N 62 1 E 74 N 62 0 E 38 N 62 5 E 92 N 62 2 E ]0000.00 6851.04 6812.04 51 8 11000.00 7500.17 7461.17 46 0 12000.00 8273.95 8234.95 31 5 13000.00 9177.38 9138.38 21 34 13229.00 9390.01 9351.01 21 51 N 61 33 E 6598.88 N 66 58 E 7358.75 N 66 30 E 7984.75 N 65 0 E 8408.55 N 64 59 E 8493.44 0.66 1 .27 I .90 0.23 0.00 3079.76 N 5836.79 E 6599.48 N 62 1] E 3417.97 N 6517.30 E 7359.19 N 62 20 E 3650.75 N 7101.32 E 7984.78 N 62 48 E 3825.17 N 7488.11 E 8408.55 N 62 56 E 3861.16 N 7565.05 E 8493.44 N 62 58 E COMPUTATION DATE; 20-AUG-91 PAGE 6 BP EXPLORATION POINT MCINTYRE #13 POINT MCINTVRE NORTH SLOPE, ALASKA DATE OF SURVEY: 11-AUG-1991 KELLY BUSHING ELEVATION: 39.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZ[MUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVER[TY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET LEG M[N 0 O0 39 O0 139 O0 239 O0 339 O0 439 O0 539 O0 639 O0 739 O0 839 04 0 O0 39 O0 139 O0 239 O0 339 O0 439 O0 539 O0 639 O0 739 O0 839 oo -39 O0 0 O0 100 O0 200 O0 300 O0 40O O0 500 O0 600 O0 700 oo 80o O0 0 0 N 0 0 E 0 2 N 44 44 W 0 4 N 65 28 W 0 6 N 21 59 W 0 7 N 83 33 W 0 6 S 26 50 W 0 5 S 9 5 E 0 6 S 49 7 E 0 25 N 76 27 E 2 35 N 63 34 E 0 O0 0 O0 -0 05 -0 06 -0 13 -0 30 -0 4O -0 38 -0 26 2 29 0.00 0,00 001 0 O0 0 O0 0 O0 0 O0 0 O0 1 74 2 43 0 O0 N 0 O0 N 0 O0 S 0 14 N 0 25 N 0 16 N 0 O0 N 0 11 S 021 S 0 89 N 0 O0 E 0 O0 E 0 05 W 0 14 W 0 27 W 0 42 W 0 45 W 0384 0 184. 2 12 E 0 O0 N 0 0 E O0 N 0 0 E 05 S 88 59 W 19 N 44 59 W 37 N 46 51 W 45 N 69 18 W 45 N 89 37 4' 39 S 74 18 W 27 S 41 14 4' 29 N 67 17 E 939.29 1040.08 1039 1141.51 1139 1243.70 1239 1346.70 1339 1449,86 1439 1553.51 1539 1658.96 1639 1767.33 1739 1878.63 1839 939 O0 900 O0 O0 1000 O0 1100 O0 1200 O0 1300 O0 1400 O0 1500 O0 1600 O0 1700 O0 1800 5 25 N 66 6 E O0 8 34 N 66 58 E O0 10 39 N 65 44 E O0 13 9 N 62 6 E O0 14 9 N 61 21 E O0 14 26 N 63 41 E O0 16 27 N 66 44 E O0 20 37 N 69 37 E O0 24 26 N 71 4 E O0 27 23 N 70 51 E 9 18 21 61 38 54 59 52 84 18 109 53 136 76 169 96 211 30 259 63 331 2 20 2 20 2 44 0 38 0 94 3 26 3 92 3 12 1 67 3 82 N 8 15 24 36 48 59 71 85 101 8 35 E 69 N 19 47 N 35 65 N 54 47 N 75 17 N 98 61N 123 91N 154 84 N 193 67 N 239 9 19 N 65 26 E 83 E 21 38 E 38 25 E 59 9O E 84 39 E 109 12 E 136 11 E 170 42 E 211 61 E 260 65 N 66 19 E 61 N 66 23 E 58 N 65 34 E 20 N 64 20 E 55 N 63 55 E 79 N 64 10 E 06 N 64 59 E 61 N 66 4 E 29 N 67 0 E 1992.30 1939 O0 1900.00 29 51 2109 37 2O39 2229 95 2139 2355 70 2239 2486 96 2339 2623 83 2439 2766 11 2539 2914.05 2639 3069.24 2739 3229.86 2839 O0 2000.00 32 32 O0 2100.00 35 33 O0 2200.00 38 50 O0 2300.00 41 49 O0 2400.00 44 11 OO 2500.00 46 42 O0 2600.00 48 28 O0 2700.00 51 23 O0 2800.00 51 21 N 7C 36 E N 64 46 E N 59 17 E N 60 54 E N 63 21 E N 64 21 E N 60 33 E N 61 21 E N 61 44 E 1024 N 61 13 E 1149 313 17 373 70 440 99 517 li 602 08 695 44 796 61 905 54 16 79 3.25 4.99 3.03 2.01 3.54 3.33 1 .97 1 .63 1 .88 0.49 119 49 N 290 63 E 314.23 N 67 39 E 141 174 212 252 292 339 393 449 509 83 N 347 41N 406 29 N 472 73 N 546 26 N 631 72 N 720 07 N 816 50 N 920 96 N 1030 18 E 375.03 N 67 47 E 10 E 441.97 N 66 45 E 23 E 517.75 N 65 48 E 98 E 602.55 N 65 12 E 63 E 695.96 N 65 10 E 99 E 797.02 N 64 46 E 05 E 905.78 N 64 17 E 43 E 1024.32 N 63 58 E 61 E 1149.88 N 63 40 E 3394,23 2939.00 2900.00 53 25 3561 53 3039.00 3000.00 53 47 3730 12 3139.00 3100.00 53 28 3902 41 3239.00 3200 O0 55 26 4076 23 3339.00 3300 O0 54 32 4248 95 3439.00 3400 O0 54 5 4410 90 3539.00 3500 O0 51 41 4575 47 3639.00 3600 O0 52 32 4742 88 3739.00 3700 O0 54 35 4912.83 3839.00 3800 N 60 21 E 1280 13 N 60 43 E 1414 13 N 62 5 E 1549 81 N 62 52 E 1690 09 N 63 3 E 1832 N 61 53 E 1973 N 61 50 E 2100 N 61 38 E 2231 N 61 45 E 2365 O0 53 46 N 62 3 E 2502 25 07 41 O8 30 69 0.24 1 40 1 19 1 37 0 58 5 73 2 09 0 28 1 69 0 62 573 63 N 1144 45 E 1280 16 N 63 23 E 639 704 769 833 898 958 1020 1084 1148 61 N 1261 67 N 1380 58 N 1504 32 N 1631 41N 1756 48 N 1868 50 N 1984 16 N 2102 80 N 2223 22 E 1414 34 E 1549 71 E 1690 78 E 1832 66 E 1973 97 E 2100 02 E 2231 22 E 2365 48 E 2502 t4 N 63 7 E 81 N 62 57 E 09 N 62 55 E 25 N 62 57 E 07 N 62 55 E 41 N 62 51 E 09 N 62 47 E 32 N 62 43 E 72 N 62 41 E COMPUTATION DATE: 20-AUG-91 PAGE 7 BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY: Il-AUG-1991 KELLY BUSHING ELEVATION: 39.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUT~ DEPTH DEPTH DEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 5083 80 3939.00 3900 O0 55 9 5259 5433 5603 5772 5947 6123 6296 6472 6647 95 4039.00 4000 14 4139.00 4100 90 4239.00 4200 65 4339.00 4300 43 4439.00 4400 13 4539.00 4500 28 4639.00 4600 28 4739.00 4700 78 4839.00 4800 O0 55 10 O0 54 22 O0 53 51 O0 53 40 O0 55 32 O0 55 2 O0 54 27 O0 55 27 O0 55 1 N 60 39 E 2641 32 N 59 33 E 2786 N 59 44 E 2927 N 59 47 E 3065 N 59 43 E 3201 N 60 31 E 3344 N 60 6 E 3486 N 60 26 E 3629 N 62 37 E 3774 N 62 35 E 3918 10 26 46 18 34 66 82 62 84 3 37 0 43 0 47 0 39 0 96 0 45 1 14 2 08 0 83 0 38 1214 56 N 2345 56 E 2641 36 N 62 37 E 1287 1359 1429 1497 1568 1640 17t0 1778 1845 81N 2470 24 N 2592 07 N 2712 40 N 2829 74 N 2954 26 N 3079 87 N 3202 97 N 3329 45 N 3457 72 E 2786 75 E 2927 27 E 3065 76 E 3201 07 E 3344 6O E 3489 05 E 3630 86 E 3775 84 E 3919 20 N 62 28 E 43 N 62 20 E 72 N 62 13 E 52 N 62 7 E 77 N 62 2 E 18 N 61 58 E 45 N 6i 53 E 27 N 61 53 E 48 N 6i 55 E 6820 76 4939 O0 4900 O0 54 27 6991 7159 7329 7499 7668 7834 8002 8170 8339 34 5O39 96 5139 48 5239 55 5339 29 5439 56 5539 18 5639 82 5739 21 5839 O0 5000 O0 5100 O0 5200 O0 5300 O0 5400 O0 5500 O0 56O0 O0 5700 O0 5800 O0 53 51 N 63 35 E 4198 O0 53 31 N 64 9 E 4333 O0 54 1 N 61 52 E 4470 O0 53 58 N 61 56 E 4608 O0 53 31 N 62 27 E 4744 O0 52 43 N 62 50 E 4877 O0 53 36 N 62 2 E 5011 O0 53 31 N 60 40 E 5147 O0 53 28 N 60 38 E 5282 N 63 16 E 4059 98 17 91 78 32 22 06 57 32 67 0.73 0.64 0.67 1 .13 0.87 0.49 0.81 0.72 0.80 0 1909 71 N 3583 50 E 4060 6C N 61 57 E 1971 2031 2094 2159 2222 2283 2346 2410 2477 59 N 3707 28 N 3829 34 N 3950 14 N 4071 56 N 4192 58 N 4310 02 N 4429 84 N 4548 49 N 4666 07 E 4198 O1 E 4334 48 E 4471 84 E 4608 04 E 4744 03 E 4877 18 E 5012 50 E 5147 45 E 5283 75 N 62 0 E 44 N 62 3 E 30 N 62 4 E 87 N 62 4 E 78 N 62 4 E 61 N 62 5 E 13 N 62 5 E 92 N 62 5 E 34 N 62 2 E 8506.47 5939 O0 5900 O0 52 58 8672.23 6039 8840.52 6139 9008.14 6239 9174.65 6339 9340.52 6439 9503.39 6539 9663.86 6639 9822.26 6739 9980.80 6839 O0 6000 O0 53 4 oo 6100 oo 53 42 O0 6200 O0 53 6 O0 6300 O0 53 2 oo 6400 oo 52 29 O0 6500 oo 51 54 O0 6600.00 51 2 O0 6700.00 50 30 O0 6800.00 51 10 N 61 8 E 5416 66 N 61 57 E 5548 N 62 44 E 5684 N 63 10 E 5818 N 63 34 E 5951 N 64 2 E 6084 N 64 43 E 6212 N 63 40 E 6338 N 61 42 E 6460 N 61 27 E 6583 81 15 68 ~3 65 ll 95 94 0 79 1 20 1 16 0 77 0 35 1 O1 0 15 0 34 0 84 0 43 2542 88 N 4783 50 E 5417 39 N 62 0 E 2606 2668 2729 2789 2847 2903 2958 3013 3072 06 N 4899 44 N 5019 55 N 5139 31N 5258 85 N 5377 35 N 5493 12 N 5606 84 N 5715 63 N 5823 63 E 5549 74 E 5684 59 E 5819 56 E 5952 24 E 6084 20 E 6213 11 E 6336 58 E 6461 65 E 6584 58 N 62 0 E 93 N 62 0 E 43 N 62 2 E 54 N 62 3 E 81 N 62 6 E 27 N 62 9 E 68 N 62 Il E 51 N 62 12 E 52 N 62 11 E 10140.11 6939 O0 6900.00 50 59 10298.51 7039 10455.73 7139 10611.44 7239 10763.60 7339 10911.43 7439 11055.67 7539 11196.45 7639 11333.00 7739 11464.88 7839 O0 7000.00 50 43 O0 7100.00 50 8 O0 7200.00 49 47 O0 7300 O0 47 47 O0 7400 O0 46 39 O0 7500 O0 45 39 O0 7600 O0 43 18 O0 7700 O0 42 19 O0 7800 O0 39 32 N 62 3 E 670792 N 62 24 E 6830 N 63 6 E 6952 N 64 9 E 7071 N 64 23 E 7186 N 66 6 E 7294 N 67 24 E 7398 N 68 28 E 7497 N 69 47 E 7589 N 70 2 E 7675 75 O6 41 O4 83 53 22 66 O0 0 18 0 48 0 95 0 88 1 05 1 36 0 42 1 27 2 30 0 65 3131.16 N 5932.97 E 6708 53 N 62 11 E 3188.36 N 6041.69 E 6831 3244.11N 6149.43 E 6952 3297.22 N 6256.32 E 7072 3346.94 N 6359.64 E 7186 3392.49 N 6458.53 E 7295 3433.42 N 6554.07 E 7398 3470.52 N 6645.94 E 7497 3503.67 N 6732.81 E 7589 3533.28 N 6813.51 E 7675 37 N 62 11 E 68 N 62 11 E O0 N 62 13 E 59 N 62 15 E 32 N 62 17 E 93 N 62 21 E 54 N 62 26 E 89 N 62 30 E 15 N 62 35 E BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 20-AUG-91 PAGE 8 DATE OF SURVEY: 11-AUG-1991 KELLY BUSHING ELEVATION: 39.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUE5 FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTh DEPTH DEPTH DEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUT~ FEET DEG/100 FEET FEET FEET DEG MIN 11593 29 7939.00 7900 O0 37 44 11717 11839 11959 12075 12191 12304 12417 12527 12636 48 8039.00 8000 O0 35 10 21 8139.00 8100 O0 34 29 03 8239.00 8200 O0 31 53 64 8339.00 8300 O0 30 23 11 8439.00 8400 O0 29 10 77 8539.00 8500 O0 27 41 19 8639.00 8600 O0 26 40 84 8739.00 8700.00 24 0 53 8839.00 8800.00 22 17 N 68 52 E 7754 97 N 66 54 E 7828 32 N 66 52 E 7897 56 N 66 40 E 7963 40 N 66 20 E 8023 N 65 47 E 8080 N 65 43 E 8134 N 66 11E 8186 N 65 52 E 8233 N 65 57 E 8275 26 92 87 46 95 2 65 1 15 0 80 2 38 0 72 1 8O 0 89 441 2 24 1 17 3561.09 N 6889 3589.02 N 6957 3616.21N 7021 3642.25 N 7081 3666.20 N 7136 3689.67 ~ 718~ 3711.85 ~ 7238 3733.07 ~ 7285 3752.42 N 7328 3769.80 ~ 7367 10 E 7755 06 N 62 40 E 2O E 7828 O6 E 7897 69 E 7963 67 E 8023 42 E 8080 66 E 8134 45 E 8186 66 E 8233 50 E 8275 39 N 62 43 E 61 N 62 45 E 43 N 62 47 E 28 N 62 49 E 93 N 62 50 E 88 N 62 5~ E 18 N 62 52 E 47 N 62 53 E 96 N 62 54 E 12744,14 8939.00 8900.00 21 7 N 65 21 E 8315.65 12851.41 9039,00 9000.00 21 24 N 65 23 E 8354.44 12958.76 9139.00 9100.00 21 24 N 65 2 E 8393.45 13066.31 9239.00 9200.00 21 47 N 64 49 E 8433.02 13174.05 9339.00 9300.00 21 51 N 64 59 E 8473.00 13229.00 9390.01 9351.01 21 51 N 64 59 E 8493.44 0 49 1 03 0 39 0 17 0 O0 0 O0 3786.11 N 7403 74 E 8315.65 N 62 55 E 3802.39 N 7438 99 E 8354.44 N 62 56 E 3818.79 N 7474 41 E 8393.45 N 62 56 E 3835.56 N 7510 28 E 8433.02 N 62 57 E 3852.51 N 7546 52 E 8473.00 N 62 57 E 3861.16 N 7565 05 E 8493.44 N 62 58 E COMPUTATION DATE: 20-AUG-91 PAGE BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH SLOPE, ALASKA MARKER TOP 7" LINER 9 5/8" CASING SHOE GCT LAST READING PBTD ~---t-~' CASING SHOE ~S DEPTH DATE OF SURVEY: Il-AUG-1991 KELLY BUSHING ELEVATION: 39.00 FT ENGINEER: M.MCBR~DE INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 520' FNL & 4257' FEL, SEC14 T12N R14E MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 12420 O0 12737 O0 13102 80 13149 O0 13229 O0 13229 O0 8641 51 8932 35 9272 88 9315 75 939O 01 9390 01 8602 51 8893 35 9233 88 9276 75 9351 01 9351 01 3733 57 N 3785 04 N 3841 32 N 3848 57 N 3861 16 N 386t 16 N 7286.60 E 7401.40 E 7522.55 E 7538.07 E 7565.05 E 7565.05 E BP EXPLORATION POINT MCINTYRE #13 POINT MCINTYRE NORTH SLOPE, ALASKA MARKER COMPUTATION DATE: 20-AUG-91 STRATIGRAPHIC SUMMARY MEASURED DEPTH BELOW KB 13149.00 13229.00 PBTD FINAL WELL LOCATION AT TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 13229.00 9390.01 9351.01 PAGE 10 DATE OF SURVEY: Il-AUG-1991 KELLY BUSHING ELEVATION: 39.00 FT ENGINEER; M.MCBRIDE SURFACE LOCATION = 520' FNL & 4257' FEL, SEC14 T12N R14E TVD RECTANGULAR COORDINATES FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 9315.75 9276.75 3848.57 N 7538.07 E 9390.01 9351.01 3861.16 N 7565.05 E HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG 8493.44 N 62 58 E DIRECTIONAL SURVEY COMPANY BP EXPLORATION FIELD POINT MCINTYRE WELt. POINT MCIN'FYRE #13 COUNTRY USA RUN ONE DATE LOGGED 11 - AUG - 91 DEPTH UNIT FEET REFERENCE 74847 Al Inllrlxe~na ~'e opinions I:)aaed on I~1 ~ e~l ~ ~r me~eml~ ~4 ~ ~n~ ~d ~o n~ M~ ~e a~a~ or ~me~en or ~ ~~& ~ ~ aM ~ ~ m me ~e ~ gma8 or ~ ~ ~ our pa~ De I1~ ~ rospon~le r~ a~ M8~ ~ ~el ~ ~l m~wed or 8~d ~ ~ ro~ ~m ~ ~o~reM~on m~o ~y a~ of our ~ agl~ ~ ~pMy~ ~ese I~e~m~om ~e WELL: PT. MCINTYRE #13 (520' FNL, 4257' FEL, SEC 14, TWN i2N, RNG 14E) VERTICAL PROJECTION .-4000 -2OOO O O 2000 4000 ~ 8000 10000 12000 '"i'"i'"i'"i ...... i-"i'"i'"i ...... !-"!"'i"'i ...... i'--!---i---i", --'i-"i'"i":i ..... !--'!-'-i-'-i ...... i-'i-"i'"i ...... i---!'"i---i ....... i---!---i---~ ...... i'-'i--'i---i ...... !'"i'"i--i ...... i'--i--'i'-'! ...... i--i'--i--'i ..... !'"!'"!'"i ..... !"°i-°!-'~ ...... !'";°"~'"i ~::!~ ::.[ ..... ~...!...[...i...[ .... i...!...[...!.. ~ ..... i..i.'..i..~ i..!...[...~...i ...... [,..i...i ..... : .... -:-i:--! ...... i'"! ...... i ...... i ......... !---he ......... !'m-i ..... ~"~'i ......... ~ ......... i ...... i--.~ ...... }-.-i ...... ~ ...... i---i---~'-'?~5--?-~'~---hl---i--.~-~-~'t'~!~'~--!-'-~-E!e-~'~-O-,i'"i ...... i..-~...hi--. ---i ............... i ............ ~---} ...... i ............ m ...... ¢---~.--i--.i ......... i---i ......... }.--}-.-}.--} ...... i---!---i---~ ...... i-.-;.--i---}.-:..-¢4-~1.*:~-.} ...... i---i.--!---i-'-.:--.i---i.--i---i ...... i..-i---[.-.i ......... i ................... ...... :.--: ...... ! ............ ~ ......... h.-h.-; ...... i ...... i--.~ ..... ~.'-!---¢---~ ...... ~---¥'-!-'-~ ....... h.-i.--!---! ...... i-.-~-..~---: ...... i---h--~--.¥---.-:.--~---~--.~.-~.~---i.--i---~ ..... i--.i---~.--~ ...... !'--~-.'~ ........................ ~ ...... : ............... :"'~"' · -.~...}...~..-~ i..., ~ ....... ~...i-..i...i...]...i-..i.~-i ~...i...i...i...i..-~...~...~...i ...... i..-i...i...~ ......... i ...... ~...i...~-..i...~...~ ...... ~...~...i...i...~...~...i...~...~...: ..... :-.- x~i ...... i ...... i...i...;...i ..... i...~...~...i ...... *.--i ......... .~...~.~..~ .... ~...~..~.: .... ~...!.~...,...i...~.~ ..... i...~...i...~ ...... ~...~...~..i i.: ...... ,~.~_.~... ,.. ..................... . .............. "'['"["T"~ ...... i"T"['"i ..... ~'"!'"!'"! ......... !'~'!'"! ......... ['"! ......... ~"!'~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ; ~ i ~ ~ 7 ~ ~ ~ i ~\i ~ ~ ~ ~ ~ ; ~ ~ i i '~::: :[:[,:;!'; :::: .:.: :::. · ....... ................... ::: :::: :::: .-.~-.-~---~--.~ ....... i---~--.~---~ ....... ~---~--¥---~ ...... ;---~---~.-.~ ...... ~---~-.-~..-i ...... ~---~..-~--.~ ...... i'"~"'i'"! ...... !'"i'"~'"i ...... !'"i"'i'"i ...... i'"~'"!'";"'i"'i'"i"'i ...... ?"!'"? ..... !'";'"? ...... !'"!'"?"? ...... i-"?'i'"i ...... r"?"!"'; ~.-::.: ....... :: ........................................... }-~:..!---!...!...! ...... !..-!-.-!...} ...... !.-.!-.-!..-} .... !...!-.-!..-! ...... ~...i.-.!-..! ...... i-..!...i..-! ...... !--.i...i--.! ...... i...!...!...i .... ~.-.~...~.-.~ ....... !...!-..?!-.. ::: .... :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ....... ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::i:::}:::}:::i::: :::i:::i:::!:::i::: :::i:::}:::i:::}:::;:::i:::i:::i:::--.~'"~'"~"'~'"~ ...... ?'"'"?"~ ::: ::: ::: :: ::: :: ::: :::,---!.--!---!--.i--- ::: ::: ::: ::: :::-:: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: :::'::: ::: ::: ::: ::: ::: ::: ::: :::: ::: ::: ::: :;:: :::: :::: :::: :::: ::: :::: ...?..?..r...r...:...r..r..? ...... r...r..?r ....... r.?..? r..??..[ ...... r..r..r..r...r?.?..? ...... r..r..r..[ ...... r..r..r..~...?.r...r..r ...... ?j...r..?:...[...r.:...?.r..r.., .... r...?.r...7...r...?..[ "'i'"!'"!'"!'"~-i'"!'"i'"~ ...... !-'i'"!'"i .... !--'!---!'"! .... i'"!'"i"'!'"i'"!'"i'"i'"i'"i'"i-! ...... i'"i'"i'"i ....... !'"i"'!'"i ...... !'"i'"~'"i ...... i'"i'"i'"i ...... i'"i'"!'"! ...... !'-'i'"!'''; ...... i'"!?"! ...... i"'!'"!'"i ...... .... '"~'"i'"!'"i ....... i"'!'"i"'! ...... i'"i'"i"'i ..... ?'??"? ...... ~"-;"'r"; ...... ??"r"? ...... ?"?"?"; ...... ?"?"?"1 ...... ,"','"'"" ....... '"'"'"'"'"'"'""""'""~"'"'"'"'"" ...... '"""'"'"'" . .... }"?'i'"} .......::::,.--, ....... , ...................... :::: ~.--,.--!-.-i ............. ...... ,---~---,---i ...... ~---~---!..-! ...... ,---~---~..-i~ ..... ...... ~--.~--.~--.i ............................... i ........................... i ............... ...;...;...;...;...::::..-;...~...i'...¢ ...... ;...;.-.:...; ...... ;...i...~...;...''~' ~''~''~ ~ ~"'i'"i'"!'"i ...... i'"i'"i"'i ...... !'"i'"i'"! ...... i'"i'"i'"i ...... i"'i"'i'"i ...... !'"i'"!'"i ............ '-'~'"~"-;'"; ...... r"r"?? ...... ,'", ....... : ...... :'",'",'", ,...,...:...,.... ....... : : : : . · . , . . . . : : : : : : : : "';"'["T"i''~ ,..?..?..?;.-?.;...?..; ...... ?..;...?..; ............... ........................ ~ ..... :...~...~...: ...... :...:.--:-.-~.--:-.-:---:-.-: ...... :-.-~---:---: ...... ~--.:---:---~ ...... ;--.?--?--! ................. ~ ............ .................... ::::::::: :::: :::: .::: ,::: .... .... . . . . . ................... .... ~...~...~...~ ..... ~...~...~...~ ...... ~...~...~...~ ...... ~...~...~...i ...... h--i--.~---~ ...... :---:-o-:---:--.:---~-.h--h--~-'.~---i'"i"-i"-i ...... :'"~'":'": ...... ~'":'"~"'~ ...... :'":'":'": ...... :'";'":"'~ ....... :'":'":'": ...... h--h.-i---i ..... i.--~--.;---~ ...... i'"i'"i"'i'" !;;; ::::...~...[...~...~... ~ :::: .... ::::':::: ::::,..~...:...:...~ ............................................ i.-.~--.;-.';" ?.;...?oo? ..... ~...~...~..o~o....... ........ .............................................. ?.-?-.?--: .... ?"?'?'";'";"'?";'"; ....... ?F"?"!"'?"'?'"?"?". ....... . , . . ---?--!---i---i ...... !-°-~---!--'i ...... !"-!---!'--f-"i---i---!'--! ...... i---i---!---i ...... i-'-!---i-'-i---;--'i---!---i---i ....... i--'i---!---! ...... !--'i"-!---!-"i---!---i-!---! ...... i---i'-'!---i ...... i---!'-'i---! ...... i-i-i? ..... !'"!"'i'"i ...... ~'"~'"!'"~ ...... .... !-.i...i---i~...~-.-~---~.--~ ...... ~.--i--.~---~ ...... h--;---~---; ...... ~..-h..~..-i ...... ~-.-h-.~-.-h--;-.-;---~---h.-~ ...... ~.--~-~-i---~ ...... ~---;---~---~ .... ~---~---~.--~ ...... h--~--.~-..~ ...... i'"i"'i'"i ...... i'"i"?"; ...... ?'!"';'"; ...... ?";"?'";'"!'";'";'"?' F";'"?"; ...... ?';~'?"; ...... ;"?'"?'; .... '"':'"~'":'": ....... ?"?'?; ...... ??;'"?"'"??'?? ...... ?'??"; ...... ..~...:...~...: ............ ..... :...:...:...: ...... :...:-.~...~...~...~...h..;~...~...~-i...i o-.:...~...:...~..~:::: ...:...~...:-.-~-.;::: ~---~-.-~--*~ ...... ~-.-i---~-.-~...-~---~-.-~---~ ...... ~--.i--.h--~ ....... h--~-"h"~ ...... i'"i'"!'"i ....... ?"?'?'? ....... ?"?";'"? ...... ?--i---!---! ..... !-'-!~--!-! ...... i---i.-.i.-~ ---!~--!---i---!--~---!~-----i---i---!---i ...... i---!---i-i ....... i---i---!---i ..... i--.i---!-..i ...... !--,-!-.-!-..!,.-.i.-.i.-.i...!..','-~i-'-i-"!'"i ...... ???'-~ ...... ?..i-?-i ....... i'"?"?'~ ...... WELL: PT. MCINTYRE//'13 (520' FNL, 4257' FEL, SEC 14, TWN 12N, RNG 14E) .)RIZONTAL PROJECTION 1oooo "!'"!'"i'"i ...... ............... i---!...i..-!---!--'i"-i-"! ...... i"'!"'!'"i ...... i"'!"'~'"! ...... ~"'~"'~'"?'~'"i?'"i .... !'"!-'+--~'-?"~"+-~ ...... ~--.~-..~---~ ...... ~--.~ ....... ~ ...... i---!-.-~-.-i...~.--!--.i...~.-.~ ...... ~--?.-i? ........... ~..+-~ ...... ~ ....... ~ "~'"!'"!'"~ ....... i'"!'"!'"! ...... !'"!'"!"~i'"!''':'''~'''~ ...... !"'!'"!'"!'",'"!"""T'T'"'"""!'":"'!'":"'?"?"!"'! ...... i'"i"'~'"! ...... i'"?"?~ ..... ?'i'"! ...... ?~'"i'"~ ...... i'"??"i ...... ~"'~---~-'~ ....... i?-!fi ...... .--i-.-!-..i..-i ...... i--.i...i---! ...... !-..i---i.--i ...... i!.il...i...!...!...~ ...... i...L.!...~ ..... i...~...:...: ...... ~...~...i...~ ...... ~...~...~---~ ...... i...~...i...i...,...~.-.i...~...~ ...... i...i...i-..i ....... ~...~...~...i ...... ~...i..-i...i ...... i.-i-.L-i ...... '"?"'!'"i"'?"?i ...... ?"!'"! ...... ?.i.--i ...... i.--~..-!...! ...... i.-.i--.!...! ..... !.--?i--.i ...... i..-!.-.i-.~i ...... F-!---i.--i ...... i-.-i...i---i---i---i-..i---i-.-i-..!-..i...i--.i-.-i ....... ~...i..+..~ ...... i...i.4-.i ...... i..+-~-..i ...... ..-:---:-'-:--'~ ...... :"':---:---: ...... :"-:---,---~ ..... ~..-:...:---~ ..... :..-~---m-: ...... :---:---~--.: ...... :--.~--.h--~ ...... i-.¥--.h.-~ ...... ~'-'i---!---h.-!---~---i--.F--~ ...... F..F--F-¥ ...... F--F.-F--~ ..... i---F--i--.! ..... h..i---h--; ...... i--i.--i--! ..... ..~...~...~...i ........... ...... ~...~...~...i ...... !...~..+..~ ...... ~...:...~...: ...... i...F.!...i..~...i...:...~i...:':... ........... .-.~--.~---~-..~-.,' ........................ ............... · "?!-'-!"-! ...... ?.'!-..m-~ ...... ~..-!-.-!--.?..~ ........ "'~'"~"'~'": ...... !'"!'"?"! ...... ~'"~"'~'"~ ...... ~'"?..~-.-~ .--~---~...m.~.- "?'-?"~'": ...... ?"?"?"~ ...... i'"!'"!'--i"-i-'-~ ....... !'--! ..... i---~-.-~--'~ ....... F"i'-'~-"~ ...... ~---!--.h.-~ ...... ~...~-.-i.--i ..... i.-.i---h-.i ...... i-.-h..~.--~ ...... F.-i..-~.--i ...... h..h-.F--i ...... ½---i---i.-.~ ...... h-.i--!--~-.~-.:-.~ ......... "!'"!"'~'"! ...... !"~!"'!'"~'"...'":'":'":'": ..... i"'! ............ i"'m!'-i ............ i"'i ...... !"'!'"i'"!"'"'i'"i"+"i ...... i'"i'"i'"f ...... ~"i"'i"'i ...... i'"i'"i"'! ...... k"i'~!-'i'-'i-"!'-'i.-.i: ..................................... ~...~...~...~ .... ~ ....... ~---~ ...... ~.-.~---~---~ ...... ~..-~---~---~---i-.-i---i---?..:...m~---k..i ...... ~-..~-..~..-~ ...... ~-.-~-..~.--~ ..... ~.--~ ....... ~ ...... i-.-~---i--.~ ...... i..-i.-.i..-~.-.i--.~-.+..i....--~--.i...~...~ ...... ~-.+..?i ................ !.-.i ...... i'-i .... ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::i:::!:::!:::i .... ~.-.m-~ ...... ~...:--.m.,..-~..-~--.~---~ ...... ........ ,---,..-~--, ...... ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ....... ......... ?'~"'!'"! ...... !'":'"!'"! ..... !'-?'-!-"? ...... ?--?--!'--! ...... !-'-!-'-?--! ...... !-.-!---~..-~ ...... ~-.-:-.-h--h-- · ..i--.i...i.-.:.:.. ...... :..::--.~ ....... ~ ...... i..-m.! ......... :: h--:---:-.-~: ......... ':~"'m'i"'''i'"~'"!'" ..-F.-i---h--h--~..-i.--h--:--.~: ........... ...... h.-m-h.-~ ...... i---:---F.-~ ...... ~'"~---h--~ ...... i..-~---~---~ ...... ~o--i--moi ...... F-~-4-.i ..... ~-.m-~-.i ...... . . .,:::: ::.: :~: :~:: ~:.: ...... i...i---i .................. i ............... ! ..................... i ............ ~L:~--i-.-i ...... i---h---i ...... i-.-~--.i.--i--.--i---i---i---i-.:.---i.-.i:--i:::i::: :"'m"'!'": ...... ~'"!'"!'"T':'"?"~'"!'"?'"~"'~'"i ...... !"'T'"!":~ '' ..... !"'!'"~'"~ ...... ~'"i'"!'"i ....... ?"i'"i'"~"'i'"!'"i"'i ....... i'"i'"?'i ? i ..-i..-i---i...i ...... ~.-?-.i.--i ...... i.--i---F! ...... i.--i-..Fi...~--.i-..i---i...i.--i-..?-.i--.i---i ..... ~.--i-.-i..-i ...... i---i---i--.i ....... !--?--i--.i ...... i.-.i.-i--~-- ................ '"i'"!"'~'--i-'-:::i:::i:::i:::i:::---:'"m-~--'m-,---~:-~--~ ..... ~-"~ ...... m','"~ ....... m'~'"~ ..... i'"i'"i'"i'"~-'!'"?i"'i"- ...... · ..,...,...,...,--.,...,..-,...,..., ...... i...i...i..-E ...... '"'"'"'""'"'"'"'"'"'"'"'"'"''"'"'"~:i::: ...... ~..i J"J"l ~ ..... ~...i i .i i. ..' i. ,L,..i...ii "'!'"TT"7 ..... r"'!'"m7 ....... 7'"!"T"5'"'"'"'""" ...... ~"'?":'"7 ...... :"'?"r'"7'"~'"?"r'"r'"~ ...... ?'"? ...... ?"7'"?m!'"r"'m?"r .... r'"?"? ...... r'"?":'", ...... ?"~'":"'?'~"'r'"?"?', ...... ,'","','","'","','",'",'" :: :.,. :::: ':: : : ;::: ::: :::: · : :':' ::: :: ;~:-:: i!!: :::: .!:i :':' :':i .... ii.! ':'' .:!: :::: '' I::! :::: '''' · ....... ~'"~"'~'"~ ...... ~'"~'"~"'~ .............. ~'"~ ..... ?"~'"i'"i ...... i...L..i ....... '"~'"~'"~'"~ ...... ~'"~"'~'"~ ........ '"~'"~'"~ ......... -"~'"~ ...... ~'"~'"~"'~ ...... ~'"~'"~'"~ ....... ~"'~'"~'"~ ...... !'"!'"!'"!'"!"'?"!'"! ..... ?'!"+"i ....... i'"i'"!'"i ...... ........... i---~--¥--i ...... ~--.~ ....... ~--.'.-~..-~ .............. k'!-'i-'! ..... !'d-! ~::: ~;~ :::: ::;: :::~ ::::,:~:~ ............... '"!"?"!'"~ ....... !"'?"? ...... ?"?'"~ ...... ?"!"'?'~ ...... ?"?'"!".'":"':'"!"'~ ...... ?"?"?"? ...... !'"~'"?"?"~"'?'"?"~ ...... !'"f'"!'"i ...... TT"!'"~ ..... !"'~'"!"'! ...... i'"i'"m~'"~'"f"'~'ff-'~ ..... ~-.+-i--! ....... '"~'-~"'-"~ ...... ~'"~"?'"?". ..'--?"!"'!'"! ...... !'"?'?"'! ....... ~"'t'"!"'~ ...... !'"?"?"! ...... ~"?--~'-'~ ..... i...L..i...i ...... L..L..~...~ ...... L..L..L..~ ...... L..~...L..! ...... i...~...i...i ...... i...i...i...i ..... i...L_L..i ....... i_.i_.i_.~ ........ ::::~.::: ::~: :::: :::: :;:: :::: :::; '.--~---i---i---! ....... i-..!--.!.--! ............................................................. ~'"i'"i'"i ...... ?'i'"?! ...... !i:~"'?"!'"i'"?"!'"?';'"!:'"i'"?"i'"i ...... ?!'"?"i ...... ?"?'!"': ! ....... !'"!"'~'"¥"¥"~ .............. ~ -?--?.-?--~.... ~---i--+.-~ ..... i---~---i---i--. ~ ~ ~ ~ ~ ~ ~ i ........ · . :iii ........ "T"!"'T'! ...... i"'F'T"! ..... !"T'T"i ...... T'~'"~"'~ ...... T'~"T"~ ...... ~"T'T"T'.'"?"?"m? ........................ ...... !'"?"?"? ..... ~"'!'"m~ ...... !'"?"? ....... !'"!'"?"~ ..... ?"?'?'? ...... '"!'"!'"!'"! ....... !'"!'"!'"! ...... !'"!'"!'"! ..... ~'"?i"'i ...... !"'~'"~"'! ...... ~'"?"~'"~ ...... !'"?"~'"~ ...... ~"?'"~'"~ ...... ~'"i'"~'"!~'"! ....... ....... ...... ~'"~'"~'"~ ...... ~'"!'"~"'~ ...... ~'"~'"~"'~ ...... ~"'m': ...... !m'~'"~ ...... "+-~"+"~,~ ...... ~"+'+"~ ............ ...... ~"+'+"~ ...... ~"'~"+"~ ..... !"'!"'i'"! ........................................... i~ ~ i'"i'"!'"!'","'i'"~'"i'"i ...... !'"i"'i'"i ...... i'"i'"!"'i ...... i'"!'"!'"i i'"?-i ...... ?'?°i ...... !??i ...... .-~-.- ii i .-~ ............ !.--F-.~--i ...... ~---F-.i.-.~ ...... F-.F--F-.~ ...... ~---~-~h.-~ ...... ½-.-F--i.--~ ...... F--~---~.--~ ...... i---!-.-~---~ ...... AOGCC GEOLOGICAL MATERIALS INVENTORY LIST .~..-~ q~ - ~1 w~,,~,[ ¢4, ~[~.r~ ~t~ COMPLETION DATE . ~ l,I ~ I q l CO. COaTACT ,, $~ , ,, cheCk off 0r list data as ii' i~' ieCeiv'~'.*li~st receiVed dat, e.A°r 407;. 'if n°t ~q'U'i'~ed list as NH 4Oil * l lSl',',l~ ~' drilling'hist°w .... ~ y su.e}l ~ we.tests '~ ~l'~,ore'a.scr~¢iOd ~ cored int~Wa~s core analysis ~ ~ ditch intewals digital data ')~~ ,"'~~ ....... 7, . ~ ~ ,/~ ~~... ~~ ~ '... ./.k~t %~ ~ ~ ................. a ~ b~, ~ .... .... LOG TYPE .......... ROil INTERVALS SCALE ..... NO. {to, the nearest foot) [inchl100'1 ._ ..... Decembe~ 19~ 1991 I"i~'. I .... C, !3mith Alaska (1.1 .i. 1 & (3as Conset'vaA'..i. on Cotam:i. ss:i. on ,gOO1 Po¥'cupine Iii". A'nchor, age, Al< 99501-.-J. 438 (.:.:.: l"r a'ns'm :i. ~; s ion ,:,'f' ~:: I'1 .i. I:, F..F~,.'5~..'iI~IlI:~ ]. e~'l'"'o P ~:;'['..7:it c_-'.2_~.:~~.1:~'c ~.l'l"), '1"~¥, o ¥.1 I:.~ el'.~ e p e Ti c  .~. ..-- . ..... .~ ...~.....-~ r) r',~ · ,~ ,' ,'~ ,, iL ,:) ~.,~ :i. n .'.:~ (,~ e 1 iL s: .... . i'.t :...[ n !.'. y i. ,...~ .ll. jl~,, ,' ,:),.J ~~ ( A ¥: c o ) ,J ~.~ n "f' I"1E F:' O I... L.. O L,J I N (3 H A "f' E R I A I.. I S B E I N (3 S U 13 H I T"F E I] l"l Ii"' R Iii] I,,J I T I"1 . P I... E A S Iii: A C K N O I,,J L.. lie [) G E RECli~.II"-'T 13Y S'.[GiqlNG A COPY OF' THT,S LE:'TTt!'~R ANO P, ETURN]IN(3 I[1" '1"O THI:3 OI-'-"F:ICli~.: -I.:, tq,:.:In't.y~,e :l~.J. 3: 8 boxes, ove'r .l:.he :i.'a-t.e~-val iL27~g9.-l:307:L, (CONF'IDli."iq'I"IAI_) 13 t.I .1. 4 .-- ':~ 9: ~L";I:) o x e s, o s, r.., t, t h ce i n 'l'. ,::-:, ~. ',, ::':~ 1 ,,.~, '::',.: 13 .... 9' 6 ',"5 ,(il , · .- 17 ', 4 b o x ,:-? s, o v ;:., ¥. 't. h ,':.~ :i. n .I- e ~. v a iL 9.1. '~. 3 .-- 9.'349 RECEIVED Alaska Oil & Gas Cons. Commission Anchorage MEMORANL UM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION TO: Lonnie C. Smlt~!j~~ Commissioner DATE: August 15, 1991 FILE NO: HH815 - 1 TELEPHONE NO: THRU: SUBJECT: RIG/BOPE Inspection BPX Pt. McIntyre #13 Permit No. 91-91 Prudhoe Oil Pool FROM: Harold R. Hawkins Petroleum Inspector Thursday Auqust 1~ 19~: I performed a RIG/BOPE inspection on Nabors 28E for BPX Pt. McIntyre no. 13. I found no infractions. I filled out a RIG/BOPE inspection report which is attached. In summary: The RIG/BOPE inspection was performed satisfactorily for BPX Pt. McIntyre no. 13. Attachment. 02-00lA (Rev. 6/89) 20/ll/MEMO1.PM3 / OPERATION: Drlg / Compl ' Operator Location: Sec Drlg contr Location (gen'l) I N COMPL ! ANCE ~es n~ n/a A. DIVERTER 4. ()~() 7. (/) ( ) 8. (d 9. (v~ ll. 12. Wkvr UIC . Permit # ~TT., , R./~ M Well sign ~ff~/~/ff STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Rig/BOPE Inspection Report DATE: ~// Represe~ta~i ye/ Well name F/-'r Representative line sz & length tine cOnn& anchored bifurcated & dwn wind 90° targeted turns vlvs: auto & simultaneous annular pack-off condition B. BOP STACK wellhead flg wkg press stack wkg press annular preventer pipe rams bl i nd rams .? 13. ( ) ( ) ( ) stack anchored 1~. (I/~ ( ) ( ) {~ke/kil] line sz IN COMPLIANCE; yes n__o n/a 33. (~ ( ) 34. (~) ( ) 35. (d () 36. (~J ( ) 37. (~9 ( ) 38. (~) ( ) 39. (~/) ( ) 40. (~) ( ) 41. (~ ( ) ~2. (H () 43. (~) ( ) ~.. (~ ( ) ~5. (~) ( ) firewall nitrogen power source (back-up) condition (leaks, hoses, etc) D. MUD SYSTEM pit level floats installed flow rate sensors mud gas separator '. degasser separator bypass gas sensor chke In conn trip tank E. RIG FLOOR ' kelly cocks (upper,lower, IBOP) floor vlvs (dart vlv, ball vlv) 15. (-), (-) 16. ( ( ) ( ) HCR vlvs (chke & kill) 17. (~' ( ) ~8.(~ () 19. ('~ ( ) 20. (~ ( ) 21. (~ ( ) 22. (v9/ ( ) 23. (/ ( ) 24. (vi ( ) 25. (~ ( ) 26. (y~ ( ) 27. (yJ ( ) 28. (v~ ( ) 29. (~ ( ) 30. (d ( ) 31. (~ ( ) 32.(v') () ( ) 90° turns targeted (chke & kill ln) 46. (m) ( ) 47. (~') ( ) manual Vlvs (chke & kill) connections (flgd~ whd, clmpd) ~'rl spool ,:~] ow nipple ,~]o'w monitor &ootro] lines fire protected .. C. CLOSING UNITS wkg press fluid level O~rtg press press gauges sufficient vlvs regulator bypass 4-way vlvs (actuators) blind handle cover driller control panel remote control panel 48. (KD ( ) ~9. (~ ( ) 5o.(W/ () 51.(~ () s2.(¥ () 53. (~' ( ) 5,+. (~ () 55.'(~)~ () 56. (u/ ( ) 57. (~.~ ( ) 58 ( () ( ) kelly & floor vlv wrenches ( ) driller's console (flow monitor, flow rate indicator, pit level indicators, gauges) ( ) kill sheet up-to-date ( ) gas ~eteetion monitors (H-S & methane) ( ) hydr chke panel ( ) chke manifold F. MISC EQUIPMENT ( ) flare/vent line ( ) 90° turns targeted (dwn strm choke Ins) ( ) reserve pit tankage ( ) personnel protective equip avail ( ) all drl site suprvs trained for procedures ( ) H2S probes ( ) rig housekeeping RECORDS: Date of last BOP inspection: Resulting non-compliance: Non-compliances not corrected & why:../~/~ Date corrections will be completed: BOP test & results properly entered on daily record? Date of last BOP test: ~.~ff~' / / Kill sheet current?/~ Inspector £.001_~ ( rev {37/(}R/q1 ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION DESIGNATION OF OPERATOR 20 AAC 25.020 1. Name of Owner Exxon Corporation 2. Address P.O. Box 2180 Houston, TX 77252-2180 3. Notice is hereby given of a designation of operatorship for the oil and gas property described below: Property designation: ADL 34624 Legal description of property: West Dock #3 T12N, R14E UM Sec. 14 NW 1/4 For operations associated with the drilling and operation of the Pt. Mclntyre #13 well Property Plat Attached r"] 4. Name of Designated Operator Address BP Exploration (Alaska) Inc P.O. Box 196612 Anchorage, AK 99519-6622 RECEIVED J U L 4 991 Alaska 0il & Gas (;ohs. Oornmiss~o~ Anchorage 5. Effective date designation July 1, 1991 6. Acceptance of operatorship for the above described property with all attendant responsibilities and obligations is hereby acknowledged 7. The owner be?'e~y certifies that the foregoing is true and correct u Date Form 10-411, 12-1-85 Title Date / / · , Submit m Duphcate TO: THRU: FROM: MEMORANOUM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION Lonnle c. Smith DATE: July 22, 1991 Commissioner FILE NO: LG722 - 3 TELEPHONE NO: SUBJECT: BOP Test BPX Pt McIntyre #13 Exploratory Permit No. 91-91 Louis R. Grimaldi/~ Petroleum Inspector ~_%~1991: I traveled to the west dock area in Prudhoe Bay to witness the initial BOP test on Nabors rig #28E drilling the exploratory well "Pt. McIntyre #13" for BPX. I found the rig to be in good shape and the surrounding area being kept clean and orderly. I found much evidence of regular maintenance of the BOPE. The BOP test went well with the exception of the upper pipe rams having a very slight leak (75 PSI in five minutes). After investigation, it was found that the wear bushing in the BOP body was washed out. This item was not available on the North Slope and had to be~hot.~shoted'~up from Anchorage. The rig contacted me via telephone late this night to inform me it had been installed and tested o.k. I approved the rig to drill at this point. It should be noted that the BPX representative Zelko Runje ("Z") and the Nabors toolpusher~ Laverne Linder, performed a very in-depth BOP test and I got the impression that this was the normal procedure. In summary: With the exception of the upper pipe rams, I witnessed a good BOP test on Nabor's 28 E. 02-001A (Rev. 6/89) 20/11/MEMO1.PM3 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COI~ISSION BOPE Inspection Report OPERATION: Dr]g/ Wkvr ~7>/~ r~~T~/TES T = Initial./ Week]y~ Other Operator Representat;tve Z ~-~- ~. Location= Sec <~, T /~4 r ~q~ H O~ "~..:~/:~: Castng s.~ ~ ,:';~ ./ Drlg con~rc~r ~~ ~~ .,~tg~~ ~. Rep ~J~?,d~' Loca~ton (general) ~Well sign ~ ACcuNU~ToR SYS~B{= Housekeeping (general) Etg ~~ Full charge pressure Reserve pl~ Press after closure MUD SYSTEMS: Trip tank Ptt gauge Flow monitor Gas detectors Audio ft pstg pstg Pump tncr clos press 200 pslg / mtn .~C~ sec Full charge press attained .,.~ mtn sec Controls: Hast:er ~ Remote ~')0c,~7~ el tnd swt t:ch cover KELLY AND FLOOR SAFETY VALVES: Upper Kelly. ~'""~Test pressure BOPE STACK= Annular preventer Pipe rams Bltnd rams ~ Choke line valves HCR valve Kill line valves Check valve Lower Kelly ~ Test Ball type ~ Tes~ Inside BOP Test Choke manifold ~ Test Number valves Number flanges Adjus. table chokes Mydrau!tcally operated choke pressure ~'d~'~) pressure -~o E) (_~ pressure ~.~e..~ pressure ~ C~ ~ TEST RESULTS= Failures, Test ttme ~ ~ hrs · Repair or replacement of failed equipment: to be made within days. Notify the Inspector~ and follow with wrttten/FAXed verification to Commission office. Dtstrtbutton~ ortg - AOGCC o - Operator c - Supervisor W I TNESS -' C.OOq (rev O5/10/90) WALTER J. HICKEL, GOVERNOR REPLY TO: DEPAIIT~IENT OF LAW OFF/CE OF THE A TTORNE Y GENERA L J~ly 18, 1991 Shawn J. Holliday Groh, Eggers & Price 2550 Denali Street, suite 1700 Anchorage, Alaska 99503 Billie Pirner Garde Hardy, Milutin & Johns 500 Two Houston Center 909 Fannin at McKinney Houston, Texas 77010 ~'~ 1031 W 4TH AVENUE, SUITE 200 ANCHORAGE, ALASKA 99501- I994 PHONE: (907) 269-5100 FAX: (907) 276-3697 KEY BANK BUILDING 100 CUSHMAN ST., SUITE 400 FAIRBANKS, ALASKA 99701.4679 PHONE: (907) 452- I568 FAX: (907) 456-I317 P.O. BOX K- STATE CAPITOL JUNEAU, ALASKA 99811-0300 PHONE: (907) 465-3600 FAX: (90.7) 463-5295 Re: Exxon Corp. v. Burglin, civ. H-90-3995 Our file: 661-92-0017 Dear Mr. Holliday and Ms. Garde: I represent the Alaska Oil and Gas Conservation Commission with respect, to the deposition subpoena that was directed to its records custodian in the above-referenced case. Some of the materials requested in that subpoena are required to be maintained confidential by AS 31.05.035(c). A review of the Commission's files shows that these materials are the reports and information required by AS 31.05.035(a) for Pt. McIntyre 3, 3 dpn, 4, 5, 6, 7, 8, 9, 10, 11, 12, and 13 since the Commission is precluded by law from disclosing these materials, the Commission objects, pursuant to Federal Rule of civil'Procedure 45(d) (1), to inspection or copying of these materials. I note that all of the materials in question were filed with the Commission by the owners of the wells to which they relate, and that the owners themselves are of course not subject to the constraints of AS 31.05.035(c). Perhaps you will wish to consider directing your discovery efforts to those owners. RECI 'IYED JUL 1 919 I Alaska .Oil .& .~as Co,s, Sincerely, CHARLES E. COLE ATTORNEY~ ~ GENERAL ~ By: Robert E. Mintz Assistant Attorney General 03-C5LH TO: THRU: FROM: MEMORANL UM State of Alaska ALASFJ% OIL A/~D GAS CONSERVATION COMMISSION · Lonnie C. S~ DATE: July, 1991 Commissioner FILE NO: HH716 - 1 TELEPHONE NO: SUBJECT: Diverter Inspection/ RIG/BOPE Inspection BPX Pt McIntyre #13 Permit No. 91-91 Prudhoe Bay Field Harold R. Hawkins Petroleum InsPector saturday Julv 1~ ~9~: I inspected the diverter system and performed a RIG/BOPE inspection at BPX Pt. McIntyre #13 on Nabors rig 28E. The diverter and RIG/BOPE inspection was satifactorily performed with no infractions I could find. The last BOP test was June 12, 1991. The last RIG/BOPE inspection was on 7/5/91, Pt. McIntyre #10. In summary: I inspected the diverter system and RIG/BOPE inspection satisfactorily. Attachment. 02-001A (Rev. 6/89) 20/11/MEMO1.PM3 OPERATION: Drlg ..... Wkvr UIC Operator ~~, ' Permit Location: Sec /A/ T /2 ~ R /~ Y M Drlg contr .~~ ' Rig~ Location (gen'l) ~/~j~ Well sign / I N COMPL I ANCE; ~es n~ nya A. DIVERTER 3. (X) 4. s. (t) 6.0~) 7. (~) STATE OF ALASKA ^LASKA 01L AND GAS CONSEEVAT I ON COMM ISS BOPE Walk-Thru Inspection Report Representative Well name yO~ Representative ( ) ( ) line sz & length ( ) ( ) line conn& anchored ( ) ( ) bifurcated & dwn wind ( ) ( ) 90° targeted turns ( ) ( ) vlvs: auto & simultaneous ( ) ( ) annular pack-off 8.() () 9.() () 10. ( ) ( ) 11. ( ) ( ) 12. ( ) ( ) ~3. (~y ( ) 14. ( ) ( ) 15. ( ) ( ) 16.() () 17. ( ) ( ) 18. ( ) ( ) 19. (~ ( ) 20. (v3 ( ) 21.() () 22. (~ ( ) condi ti on B. BOP STACK wellhead fl g wkg press stack wkg press annular preventer pi pe rams blind rams stack anchored chke/kill line sz 90° turns targeted (chke & kill ln) HCR vlvs (chke & kill) manual vlvs (chke & kill) connections (flgd, whd, clmpd) drl spool flow nipple flow monitor control lines fire protected C. CLOSING UNITS wkg press fluid level oprtg press press gauges sufficient vlvs regulator bypass 4-way vlvs (actuators) blind handle cover driller control panel remote control panel 23. 24. (~) 25. (~) 26. (~') 27. (~) 28. 29. 30. 31. IN COMPLIANCE; y_~ no n/a 33. (v) (-[ ( ) firewall 34. (~) ( ) ( ) nitrogen power source (back-up) 35. (~/) ( ) ( ) condition (leaks, hoses, etc) D. MUD SYSTEM 36. (~/) ( ) ( ) pit level floats installed 37. (~ ( ) ( ) flow rate sensors 38. (V) ( ) '( ) mud gas separator 39. (~/) ( ) ( ) degasser 40. (//~ ( ) ( ) separator bypass 41. (4 ( ) ( ) gas sensor 42. (~) ( ) ( ) chke In conn 43. (~ ( ) ( ) trip tank E. RIG FLOOR 44. (~ ( ) ( ) kelly cocks (upper,lower, IBOP) 45. (~/) ( ) ( ) floor vlvs (dart vlv, ball vlv) 46. (~/) ( ) ( ) kelly & floor vlv wrenches 47. (//~ ( ) ( ) driller's console (flow monitor, flow rate indicator, pit level indicators, gauges) 48. ( ) ( ) (~ kill sheet up-to-date 49. (~ ( ) ( ) gas ~etection monitors (H S & methane) 50. (t~)' ( ) ( ) hydr chke panel 51. ( ) ( ) (~) chke manifold F. MISC EQUIPMENT 52. (Z~) ( ) ( ) flare/vent line 53. (/~)' ( ) ( ) 90° turns targeted (dwn strm choke Ins) 54. ( ) ( ) (~ reserve pit tankage 55. (~ ( ) ( ) personnel protective equip avail 56..(~ ( ) ( ) all drl site suprvs trained for procedures 57. (~ ( ) ( ) H2S probes 58. (~ ( ) ( ) rig housekeeping REMARKS: Date of last BOP inspection: ~/Z~ Y~/,/.,~,,~/ Date of last BOP test: _~/" Resulting non-compliance: Non-compliances not corrected & why: Date corrections will be completed: BOP test & results properly entered on daily record? V~ Kill sheet current? ~ / C.0013 (rev 04/29/91 ) BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907') 561-5111 July 9th, 1991 Blair Wondzell AOGCC 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Wondzell, Reference' Rule 20 AAC 25.035 Pt. Mclntyre #6 was the first well drilled at West Dock 3. A 20" diverter system was used while drilling surface hole. Pt. Mc. #6 and subsequent wells drilled at West Dock 3 encountered no gas or abnormal pressures while drilling surface hole. Drilling experience on West Dock 3 indicates that a diverter system in not necessary in drilling surface hole. Therefore, BP Exploration (Alaska) Inc. respectfully requests a waiver to Rule 20 AAC 25.035 requiring a diverter system. Sincerely, Mark Stanley ~ Senior Drilling Engineer BPXA cc: Pt. Mc #13 Well file RECEIVED J U L - 9 't991 Alaska 0il & Gas Cons. Commission Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION July 1!, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 M.J. Stanley Drilling Engineer BP Exploration (Alaska) Inc. 'P. O. Box 196612 Anchorage, AK 99519-6612 Re: Pt. McIntyre #13. BP Exploration (Alaska) Inc. Permit No. 91-91 Sur. Loc. 520' FNL,4257'FEL,SEC.14,T12N,R14E UM Btmhole Loc.2044'FNL, 1908'FEL,SEC12,T12N,R14E UM Dear Mr. Stanley: Enclosed is the approved applicatiQn for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Sufficient notice must be given to allow for a representative of .the commission to witness the BOPE installed on the surface casing and a test of same prior to drilling out the surface casing shoe. David W. Jo~h~ man Oil~and~Gas Conservation Commission Alaska BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental-Conservation w/o encl. STATE OF ALASKA ~v~s~ou #~_ ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill r-Illb. Type of well. Exploratory l--I Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration BKB=36 feet Pt. Mclntyre 3. Address 6. Property Designation P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 365548 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25,025) 52O' FNL, 4257' FEL, SEC. 14, T12N, R14E Pt. Mclntyre At top of productive interval 8. Well number Number 2110' FNL, 2052' FEL, SEC. 12, T12N, R14E Pt. Mclntyre #13 2S100302630-277 At total depth 9. Approximate spud date Amount 2044'FNL, 1908'FEL, SEC. 12, T12N, R14E 7/11/91 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 365549 @ 1908' feet Pt. Mclntyre #9/22' @ 950~eet~ 3601 AC 13221'MD / 9336' TVDfeet 16. To be completed for deviated wells 17. Anticipated pressure (s~, 20 AAC 25.035 (e)(2)) Kickott depth 800 feet Maximum hole angle 54 o Maximum surface 3560 psig At total depth (TVD)9400'/4575 psig 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20 Cond. 80 Surfac~ 110' 110' 17-1/2" 13-3/8" 68# NT80C Butt 3000' Surfac~ 3036' 2700' 4270 cu fl Arcticset il 12-1/4" 9-5/8" 47# NT80S NSCC/au~ 12707' Surfac~ 12743' 8886' 2700 cu ft Class G 8-1/2" 7" 26# L-80 NSCC 729 12492 13221' 9336' 250 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECCEIVED Surface Intermediate Production JtJ L. - ~ Liner Perforation depth: measured /~laska Oil & Gas O0ns. true vertical 'Atrlchora§e 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program IT1 Drilling fluid program [] Time vs depth pict [] Refraction analysis l-I Seabed reportl-I 20 AAC 25.050 requirementsl-] c re ing is true and correct to the best of my knowledge Signed Title Drilling Engineer Date p~r~nu~)rn Commission Use Only Permit Number I ber JAppro7v/~l date See cover letter c)j..~/ [50'~'"C'~-~ - ~.~/02.,I --1/91 for other requirements Conditions ~f approval Samples required [] Yes ~No Mud Icg required []Yes ~ No Hydrogen sulfide measures [] Yes 1~ No Directional survey required ~Yes [] No Required~or BOP,~.--[~-J~ 1-13M; .~g[5M; r-I10M; I-I15M; Other: q , ~,~_ ~-"-.,.~___ [~: ~ by order of Approved~ ~,~/~ ~,~~ Commissioner the commission Date ~/~///~/ Form 10-401 Rev.~-l~'l~--8~ Submit PROP(:;)$ED WELL PROGRAM ,PI; Mg!NTYRE #13 Ob!ective Pt Mclntyre #13 will be drilled from Dockhead #3 of the West Dock causeway to further delineate the Pt Mclntyre prospect to the North. In the event that the well encounters sufficient hydrocarbons, it will be completed with the rig as a future producer. O.Derations Install & cement 20", 133# K-55 Buttress conductor from 80' BGL to surface, if necessary, one joint of 30", 157.5# pipe will be installed to support surface gravel. Install rig, over well. Vertically drill 17 1/2" hole to 800 ft TVD. Kick off and directionally drill to surface casing point at 2700 ft TVD. Run and cement 13 3/8" 68# NT-80CYHE Buttress casing to surface. Install and test 13 5/8"x 5000 psi blowout preventer stack consisting of two sets of pipe rams, one set of blind rams and one annular preventer. Estimated maximum BHP is 4575 psi at 9400ft TVD ss. Maximum possible surface pressure is 3650 psi assuming a full gas column to surface. Pressure test 13-3/8" casing. Drill out casing and 5ft of new hole and perform a leak off test. Directionally drill 12 1/4" hole to the intermediate casing point at approximately 8886ft TVD. No abnormal pressures are expected in the 12 1/4" hole section. Run open hole logs. Run and cement 9 5/8" 47# NT-80S NSCC casing to surface and cement same up to approx 4000ft MD. Test BOPE. Pressure test casing. Drill out casing and 5' of new hole and perform a formation leak off test. Drill and core 8 1/2" hole to TD. Intervals to be cored will be picked by the wellsite geologist. Run open hole logs. Run and cement 7" 26# L-80 NSCC liner from TD to approximately 250ft inside the 9 -5/8" casing. Clean out liner to the float collar. Test casing and lap to 3000psi. Change well over to NaCi brine. Run CBT/CET/GR in 7" liner and a gyroscopic survey from PBTD to surface. Complete the well with production tubing and a 9 5/8" production packer. Nipple down PROPOSED WELL PROGRAM Pt M~INTYRE #13 0 bj,ect,,,ive Pt Mclntyre #13 will be drilled from Dockhead #3 of the West Dock causeway to further delineate the Pt Mclntyre prospect to the North. In the event that the well encounters sufficient hydrocarbons, it will be completed with the rig as a future producer. O~erations Install & cement 20", 133# K-55 Buttress conductor from 80' BGL to surface, if necessary, one joint of 30", 157.5# pipe will be installed to support surface gravel. Install rig, over well. Vertically drill 17 1/2" hole to 800 ft TVD. Kick off and directionaily drill to surface casing point at 2700 ft TVD. Run and cement 13 3/8" 68# NT-80CYHE Buttress casing to surface. Install and test 13 5/8"x 5000 psi blowout preventer stack consisting of two sets of pipe rams, one set of blind rams and one annular preventer. Estimated maximum BHP is 4575 psi at 9400ft TVD ss. Maximum possible surface pressure is 3650 psi assuming a full gas column to surface. Pressure test 13-3/8" casing. Drill out casing and 5ft of new hole and perform a leak off test. Directionally drill 12 1/4" hole to the intermediate casing point at approximately 8886ft TVD. No abnormal pressures are expected in the 12 1/4" hole section. Run open hole logs. Run and cement 9 5/8" 47# NT-80S NSCC casing to surface and cement same up to approx 4000ft MD. Test BOPE. Pressure test casing. Drill out casing and 5' of new hole and perform a formation leak off test. Drill and core 8 1/2" hole to TD. Intervals to be cored will be picked by the wellsite geologist. Run open hole logs. Run and cement 7" 26# L-80 NSCC liner from TD to approximately 250ft inside the 9 -5/8" casing. Clean out liner to the float collar. Test casing and lap to 3000psi. Change well over to NaCi brine. Run CBT/CET/GR in 7" liner and a gyroscopic survey from PBTD to surface. Complete the well with production tubing and a 9 5/8" production packer. Nipple down BOPE. Install production tree on wellhead and test to 5000psi. Freeze protect the 9 5/8"x 13 3/8" annulus to 3000ft. Release rig. If hydrocarbons are encountered, the well will be flow tested with surface testing equipment after the rig has been moved off location. At the conclusion of testing, a sub-surface safety valve will be installed below the base of the permafrost and the well suspended. Fluids associated with the drilling and completion of the well will be injected down the 9 5/8"x 13 3/8" annulus. Pt. MglNTYRE #13 .~ .OPOSED WELL DIAGRAM NON-FREEZING FLUID 'r~D (BKB) MD CBKB1 20" CONDUCTOR 120 FT 120 FT BASE PERMAFROST 1786 FT 1819FT .. . SSSV 2040 FT 2110 FT 13-3/8" 68~/FT NT-80CYHE BTC 2700 Fi' 3036 FT BOTTOM OF FREEZE PROTECTION (ESTIMATED) 3300 FT TOP OF 9-5/8" CEMENT (ESTIMATED) 4000 FT ~ 4-1/2', 1~_6/~=T L~0 TDS TUBING W/GLM's AND 4-1/2" TAILPIPE ASSEMBLY 4-1/2" 'X' NIPPLE 9-5/8' PACKER 8606 FT 12442 FT 7" LINER TOP 8653 FT 12492 FT 9-5/8' 47#/FT NT-80S NSCC 8886 FT 12743 FT PLUG BACK TD 13101 FT 7" 268/FT L-80 NSCC LINER 9336 FT 13221 FT MclNTYRE #13 MUD pRG'r 1AM Interval Mud Weight Viscosity Fluid Loss (sec/qt) (ml/30min) 0-3,000' 8.8-9.8 100-200 20- 15 8.5-9.0 3,005'- 12,600' 9.2-10.5 9.2-10.5 12,600'- 13078' Set 13-3/8" casing 40-60 8-16 8.0-10.0 Set 9-5/8" casing 40-60 8-16 8.0-11.0 Mud Type/ Components Generic Mud #~ Fresh water Gel Soda Ash Barite Generic Mud #7 Fresh water Gel Caustic Soda Soda Ash Barite Sodium Bicarbonate Lignite Boreplate Drispac PHPA Polymer Generic Mud #7 Seawater Fresh water Gel Caustic Soda Soda Ash Barite Sodium Bicarbonate Lignite Boreplate Drispac PHPA Polymer Calcium Carbonate Sodium Chloride Set 7" Liner Pt. MclNTYRE #13 DIRECTIONAL DIAGRAM DEPARTURE TO BHL: 8499FT 13221 FT MD 9336 FT TVD BKB DEPARTURE TO TARGET: 8342 FT 12759 FT MD ~ TRUE 8901FTTVDBKB t~'~ ! NORTH ~ GRID ~ SURFACE LOCATION: X = 681,272FT; Y = 5,998,057FT; ASP 4 520FT SNL; 1023FT EWL SEC 14, T12N, R14E NOTE: THE CLOSEST WELL TO PT. MclNTYRE #13 IS PT. MclNTYRE ~9 LOCATED 30FT SOUTHEAST AT THE SURFACE. MJS/7-9-91 iiiiii ii i iii _$45DUA247:[DRAN043]PM13_CLOSAP_SIiORT.LIS;9 3-JUL-1991 17:13 Pape 1 --- Closest Approach Analysis --- Date: 3-JUL-91 Time: 17:13:11 Search Radius= 200 COURSE LINE For proposed well: PM13 [ 0-12-12-14] Location = W-E S-N TVD(SBS) Top 681272.00 5998057.00 -36.00 Bottom 688660.00 6001530.00 8865.00 Note: All depths in feet Below Kelly Bushing (BKB) Closest Approach WELL IDENT /PROPOSED% /NEARBY~ TVD DEPART TVD DEPART A029-2200000 PMC-06 1209.4 A029-2209600 PMC-09 950.8 SUMMARY 37.1 1214.8 2.6 CLOSEST DISTANCE Vertical /PROPOSZD~ TVD DEPART Intersection /NEARBY% TVD DEPART 54.8 1479.4 103.2 1960.5 1152.8 27.9 954.0 5.5 954.9 27.0 22.5 83.3 26.9 VERTICAL DISTANCE 475.6 -204.4 The well which comes closest to the proposed well is: A029-2209600 PMC-09 Closest approach distance = 22.5 feet KICK OFF for this run = 800.0 feet SORtie6. pT r~C $45DUA247:[DRAN043]PM13 CLOSAP S}IORTT.LIS;8 Search Radius= 200 7 DEGREE LEAD LINE For proposed well: PM13 [ 0-12-12-14] Location = W-E S-N TVD(SBS) Top 681272.00 5998057.00 -36.00 Bottom 688181.68 6002404.48 8865.00 Note: All depths in feet Below Kelly Bushing (BKB) 3-JUL-1991 --- Closest Approach Analysis --- Date: 3-JUL-91 Time: 17:14:16 17:14 Page Closest Approach WELL IDENT /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART A029-2200000 PMC-06 1168.4 30.3 1173.8 2.5 A029-2209600 PMC-09 956.2 5.9 960.3 27.7 CLOSEST DISTANCE Vertical /PROPOSED\ TVD DEPART Intersection /NEARBY\ TVD DEPART VERTICAL DISTANCE 58.9 1522.0 117.2 2024.2 102.5 496.7 22.5 1168.3 30.3 987.1 31.1 -186.7 SUMMARY The well which comes closest to the proposed well is: A029-2209600 PMC-09 Closest approach distance = 22.5 feet KICK OFF for this run = 800.0 feet NABORS 28E MUD SYSTEM PIT #1 130 BBLS mit #2 81 BBLS PIT #5 117 BBLS pTT.T. PIT 20 BRLS PIT #6 : 135 BBLS ~ TRIP TANK 170 BBLS PIT #3 137 BBLS PIT $4 179 BBLS EQUIPMENT - D~T~.T.IN~ FLUID SYSTEM (3) DERRICK FLO-LINE CLEANRR (1) DERR.TC~ ~ ~ (i) BRANDer CF-2 Ca~x~'rru~ (1) ~,'r~ MARK I ~rmJSg (1) RIG BUILT GAS BUSTER (1) DRILCO DEGASSER (1) P~T SENSOR PER PIT w/ visual and audio warning devices (1) A~ITATOR PER PIT (1) DRI~.~.ING FLOW SHOW SENSOR W/ readout convenient to the driller's console ! $-5/8"'"";000 ANNULAR PREYENTER PIPE RAiI~ BLi ND DRILLING :SPOOL SPOOL t STARTiI~IO ALL BOP EQUIPMENT 5000 PSI RATED 11. 12. 14. 15. 16. 17. 18. PS1 BOP STAC DIAGRAM_ ACCUMULATOR CAPACITY TEST __ 1. CHECK AND FILL ACCUMULATOR RESERYOIR TO PROPER LEYEL WITH HYDRAULIC FLUID. Z. ASSURE THAT ACCUMULATOR PRESSURE I$ :5000 PSi WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. :5. OBSERYE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHAi;~ING PUMP OFF. 4. RECORD ON IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. 13-5/8' BOP STACK TEST_ 1. FILL BOP STACK AND MANIFOLD WITH A NON-FREtTING LIQUID. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED. MARK RUNNING JCl NT WITH PREDETERIMI NED PLI.16 SEATING DEPTH. RUN TEST PLUG ON DRILL PIPE AND SEAT IN WELLHEAD. RUN IN LOCK DOWN SCREWS. CLOSE ANNULAR PREYENTER AND UPSTREAM YALYES'. 4. FUNCTIONALLY TEST CHOKES. 5. IN EACH OF THE FOLLOWING TF. STS, FIi~'"T HOLD A 250 PS1 LOW PRESSURE TEST FOR A MINIMUM OF $ MINUTES, THEN TEST AT THE HIGH PRESSURE. 6. INCR~E PRESSURE TO :5000 PSI AND HOLD FOR A MINIMUM OF 5 MINUTES. BLEED PRESSURE TO ZEi;~. 7. 'OPEN ANNULAR PREYENTER AND CLI~E TOP SET OF PIPE RAMS. I NCR~E PRESSURE TO 5000 PSI AND HOLD FOR AT LEAST :5 MINUTES. BLEED PRESSURE TO ZERO. 8. CLOSE YALYES DIRECTLY UPSTREAM OF CHOKES AND OPEN CHOKES. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR AT LEAST :5 MINUTES. BLEED PRESSURE TO ZEI~. 9. OPEN TOP SET OF PI PE RAMS THEN CLOSE EIOTTOM SET OF PIPE RAMS. INCREASE PRESSURE TO 5000 PSI BELOW THE BOTTOM SET OF PIPE RAMS AND HOLD FOR AT LEA~T :5 MINUTES. 10. TEST REMAINING UNTESTED MANIFOLD YALYES (IF ANY) WITH 5000 PSI UPSTREAM OF YALYE AND ZEI~ PRESSURE DOWN- STREAM. BLEED PREE~URE TO ZERO. OPEN BOTTOM SET OF PIPE RAMS. BACK OFF RUNNING JOINT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR AT LEAST 3 MINUTES. 13. BLEED PRESSURE OFF ALL EQUIPMENT. OPEN BLIND RAMS. MAKE SURE MANI FOLD AND Li NES ARE FULL OF NON- FREEZING LIQUID AND ALL YALYES ARE SET IN DRILLING POSITION. TEST STANDPIPE YALYES TO 5000 PSi. TEST KELLY COCKS AND INSIDE BOP TO $000 PSI. CHECK OPERATION OF DEGASSER. RECORD TEST INFORMATION ON BLOWOUT PREYENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERYISOR. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNC- TIONALLY OPERATE BOPE DAILY. /'-" STATE OF ALASKA '~ '~ AL~,.,4KA OIL AND GAS CONSERVATION CO,v~MISSION DESIGNATION OF OPERATOR 20 AAC 25.02O 1. Name of Owner ARCO Alaska Inc. 2. Address P.O. Box 100360 Anchorage, AK 99510-0306 3. Notice is hereby given of a designation of operatorship for the oil and gas property described below: Property designation: ADL 34624 Legal description of property: West Dock #3 T12N, R14E UM Sec. 14 NW 1/4 For operations associated with the drilling and operation of the Pt. Mclntyre #13 well. Property Plat Attached BI 4. Name of Designated Operator Address BP Exploration (Alaska) Inc P.O. Box 196612 Anchorage, AK 99519-6622 5. Effective date designation July 1, 1991 6. Acceptance of operatorship for the above described property with all attendant responsibilities and obligations is hereby acknowledged 7. The owner certifies/ that the foregoing is true and correct Signed Date Form 10-4~.1', 12-1-85 Submit in Duplicate s¢o,. , · ~o.oo E a st - - > 1QQCI 1010 102Q YOJO 1~40 10~0 1060 1070 I~ 1~ I1~ ttlO tt~ ~1~ 1140 I1~ 11~ 1170 11~ t1~ I~ 1210 1~ t:~ t2~ 1~ 12~ 1270 1~ 12~   i i i I i I I f I I I J I t I i~1 I i I I I I I i i i [ ~ ~ -~o _ . . -4~ 470- . . $1o. 12~ -$1o i I V ~.' ~ I C~ation* are co~t~ J .~ V' . . - ~ . _ . ~70- . . BP EXPLORATION (Alaska) Inc. - Structure : Point Mclntyre / West Dock [~ ' - Field : Prudhoe Bay Location : North Slope, Alasko 6~- t - 620 - . ~ i i , i i , ~ , , , i i , ~ , , , t , i , , ~ ~ i , ~ i ~ , , , 1~ 1010 1~ 1~ 1040 1~ 1~ 1070 t~ l~ 11~ 1110 11~ 11~ 1140 ll~ 11~ 11~ I1~ I1~ I~ 1210 1~ 12~ 12~ 12~ 12~ 1270 12~ ~2~ s~,~, · ,o.oo E a st - - > ITEM APPROVE DATE t2 Chru 8]'-/" (3) Admin ** CHECK LIST FOR NEW WELL PERMITS ** 7/ ol9r [8] [9 thru 13] [lo ~ 13] ¢4) Casg [14 thru 22] [23 thru 28] (6) Other '[~9 thru'31]' (6) Addl ~ geology: eng i neer i ng' D~~ MTM/ LCS RP BEW~J~ RAD JH rev 03/29/91 jo/6.011 2 3 4. 5 6 7 8 9 10 11 12 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. YES NO REMARKS . Is permit fee attached ............................................... · Is well to be located in a defined pool ............................... Is well located proper distance fr~ property line ................... " ' - Js well located proper distance Fr~ other wells ..................... Is sufficient undedicated acreage available in this pool . Is well to be deviated & is wellbore plat included. ...~. Is operator the only affected party ................ Can pemit be approved before 15-day wait .......... Does operator have a bond in force ................. Is a conservation order needed ..................... Is administrative approval needed .................. ~ .. /~ /~ ~ ~,.x~~ Is lease n~er appropriate ........................ Does well have a unique n~e & n~er ................................ ~_ / ~ - Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to -.~O~ psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. INITIAL GEO1 UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE ,~, ~' /-o,'/ ~ o i-t,,/7. ~ ~/ Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special 'effort has been made to chronologically organize this category of information. FI, EbD NA~: : POI~JT ~CIN'i'YRE ~ORf]UGN : NOR'~,H S,L~PE STATE : AI,,AS~ A APl Nt,IMt:~ER : 50-0~9-22].02-00 REFERE~'~CE ~,~[~ : 74807 I [,IS Tape Verification L.tstI. no SchlumberQer Alaska Computing Center 6-AUG-1991 PAGE: **** RFEL HEADER *$** SERVICE NA."~F, : DITE D~TE : 91108/05 O~ICIN : DI,,IS REEl, NAME : DEFAULT CONTINUATION ~ : ~ PPF~VIOUS REEL : COS~ENT : PRsCESSED BY 5Ct{LUMBERGEP [)LIS TO LIS CgNVERTER UTILITY ***.* TAPE SETRVlCE t'IAME : FDIT~ DATF ~' 91/08/05 O~[~IN : DL!S T~PF. NAME : DEFAIJLT C o N ~' I M U A T I 0 N PREVIOUS 'PA=E : CO~MMblT : PRUCM~SED BY MCliLUMBMRGER Di, IS TO LIS CONVERTER UTILITY **** FILE ItEADEP **** FTL~' r~AME : DITE .009 SERVICE : JDB VEPSlON : 41-30-] 69 D A .TF, : 91/0,9/05 MaX RFC SIZE : ~192 F!LF. TYPE : DB LAST FI[,E : ** DATA FORMAT SPECIFICATION RECORD 2 66 0 3 79 54,2 4 66 1 5 66 6 73 0 8 73 60 9 &5 ,lin 11 66 15 !2 68 -999. 14 65 .lin 15 66 '73 !6 66 0 66 .. Tame verification b'fstino Schlumberoer Alaska Computinq Center 6-AUG-~991 ]8:26 i ** SET TYPE - CHAH ** .... ................................................ TIM. D ~,4S 07 636 21 0 q I ] 4 68 0000000000 FCD bi'rE I~,t CS PI T~.; F/HR CVE[, DIq't:; FIN~N TENS DIT~ I,BF HTEN DITE I,,BF ETI~ DfTE S ITT D rTE S RPOC bi'rE V XFOC DITE V SFO~ pi'rE FTVP DI'rE V FTVZ f)ITF: V DI~V DITE V RDi~ D.[TE V R~FO DITE V RXFO OITE V RPSD DITE EPSf) DI~E XPSP DII'E IPSn DITE IP~, OlTE 2IRP DITE IRDA DITE 2TXP BITE VOF)C f)l~E IWF1 IWF~ DITE INDB DITE ~ 5VT DITE 25VW $?Iv t) I'rtf 15VS D I'I'E HV D 1 TI{: V ITE~ DITE DEGF R IT~ I)ITE DEGF MTEU DITE DEGF A~T~ l,)ITlf f,)EGF COCP ~I'I'E ~M/M CDCx ~ l'f'g I IRP ~.!TE CDLP DI'rF MM/M 07 2R2 0J. 0 9 1. 1 4 68 0000000000 07 282 Ol 0 9 1. 1 4 68 0900000000 07 636 ~.l 0 g 1 ] 4 68 0000000000 07 636 00 0 9 1 1 4 68 0000000000 07 635 21 0 g 1 1 4 6B 0000000000 07 000 n() 0 9 1. ! 4 68 00000000O0 07 636 21 0 9 I 1 4 68 0000000000 07 529 92 0 9 1 I 4 68 0000000000 07 150 Ol 0 9 I 1 4 68 0000000000 o7 000 O0 o 9 1 1 4 68 O000OO0000 07 000 O0 0 q 1, 1 4 68. O00OO00000 07 O00 O0 0 9 1 I 4 b8 00000()0000 07 () 00 o 0 0 (~ 1 ! 4 68 00 00000000 07 0(10 00 0 9 1 1 4 68 0000o00000 07 0o0 O0 0 9 1 1 4, 68 0000000000 07 O00 00 0 9 1 1 4 68 00()0000000 07 00 () 00 0 9 1 1, 4, 68 0000000000 07 OAO O0 0 9 :1 1 4 68 00000o0000 07 O00 O0 0 9 1 1. 4 6B 00000()0000 07 000 O0 0 q 1 1 4 68 0000000000 07 O00 O0 0 9 1, 1 4 6fi 0t,~00000000 07 (,)00 O0 0 9 1 1 4 68 0000000000 07 000 ¢) 0 0 0 1. 1 4 68 000 () 000000 07 000 00 0 g I 1, 4 6fl 0000000000 07 00O 00 0 0 1 I 4 68 0000000000 0 7 0 O 0 0 (.) 0 9 1 1. 4 68 0000000000 07 000 00 0 9 1 i 4 68 0 (100000000 07 o00 00 r) 9 1 1 ~ 6 B 0000000(100 07 000 O0 0 9 I ' 1 4, 68 0000000000 07 0 r) f'~ 00 0 .q 1 I ,l 68 0000 000000 07 000 00 0 9 1 I 4 68 0000000000 07 000 00 0 9 :1. ], 4 68 000 000 () 000 07 0 O 0 00 0 q 1 ~t 4 68 00 () 0 (.)00000 07 000 O0 0 9 1 ~ 4 68 0000000000 07 O 0 0 00 0 9 1 1 4 68 0 (.) 000 o 0000 07 000 00 0 9 1 1 4 68 0000000000 07 000 O0 n 9 I I 4 68 0000000000 0 'l () 00 00 0 9 1 ], 4 68 0000000000 07 000 O0 0 9 I 1 4 68 0000000000 07 000 O0 0 9 1 1 4 68 0000000000 07 000 00 0 9 1 I 4 68 0 () 00 () 0 r) 000 07 00 (.) 00 0 ~q 1 1 4 68 00 () 00 () 0000 07 0()0 O0 0 9 1 1 4 68 0000000000 0 7 000 00 0 9 1 ,! 4. 6 fl 0000000000 07 000 O0 0 9 1 ! 4 68 0000000000 07 900 00 (') q 1 1 4 68 0000000000 t) 7 000 00 0 q 1 1 ,t 6 H 0000000000 07 000 00 0 cl. I 1 4 68 00000000 O0 07 000 00 0 9 I 1 4 68 00000 (.) 00 (') 0 PAGE: Tape VerJ flcat]on blstjno Scblumberqer Alaska ComputJ. nq Center 6-AUG-.i991 ]8:~6 PAGE: I I I I I I IiX~, DTI'E ~.~/N C ~I I.,X DITE Clhm DITE ~'~/~ DC'ID DI'rE ~/~ DCI.~ DITE CSF'~ BITE I~DD D,ITE RTRD OlTE RIX'D DI'Tg IX~P BITE RTRv [:).T · E RIX~ BITE I~P~ P 7: ?~ IT,~ D 11'~70HMM S F' I., ~ DImE SPl,,!~ ,)I'rE f,]MMM SF~ BITE SFC !)!TE MA SWF3P DITE SFB~ I)ITR RSFC BITE SFCZ DITE] GPV DITE MV GP l)I~Y SPA~ D..[TE: ~4V SPD D 1' TF: MV SFVP BITE ~IV 07 000 O0 07 0 o 0 00 07 000 00 07 000 00 07 t 10 4:6 07 110 44 07 000 O 0 (} 7 00 ('~ 00 07 I 10 46 07 t!O 44 07 210 O1 07 2.1. 0 01 07 000 O0 07 000 00 07 000 00 0 7 0 0 0 0 0 07 000 '00 O7 O00 O0 (~7 000 O0 O7 000 O0 07 000 00 07 000 O0 07 00 (') 00 07 000 00 07 000 00 07 00 () 00 07 00[,I 00 07 000 0 0 07 000 00 07 !20 46 07 120 44 o7 I20 4.6 07 12O 44 07 22.2 01 07 220 Ot O 7 000 00 07 00 0 00 '37 000 O0 07 000 00 07 000 O0 07 00 f) 00 07 000 O0 07 000 o0 07 000 00 07 000 O0 07 Ol 0 01 07 010 01,. 07 00o oo 07 0 00 00 07 000 oo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 g 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 1 ! 4 68 0000000000 I 1 4. 68 0000000000 1 1 4 6 ~ () 000000000 1 I 4 68 0000000000 1 I 4 68 0000 (.} 0 (.) 000 1 1 4 68 001) 0000000 I ! 4 68 0000000000 1 1 4: 68 0n0o000000 I 1 4, 68 0 (') 00000 ¢) 00 1. 1 4 6fl 0000000000 1 ! 4 6 8 o 0 000 f') 0000 I 1 4 68 0000000o00 1 1 -~ 68 (7t 000000000 1 1. 4 68 00 (.) {:) 000000 1 ,1, 4 68 0000000000 1 I 4 68 00000000()0 !. 1 4 68 Oot)O000000 1 1 4 68 0000000000 I I .4 68 0000000000 1 I 4. 68 Oo00000000 1, 1. 4. 68 0000000000 I 1 4 68 0000000000 1 1 4 68 0000000000 I ~ .4 68 ()(.)00000000 1 I 4 68 0000000000 1 1. 4: 68 0000000000 1 1 4 68 0000000000 1 1 4. 6g 0000000000 .1 1 4 68 (.) 0 00000000 !, 1 .4 68 000000000 O 1 1. 4 68 o00000o000 1 I 4 68 0000000000 1 1 4 6~.~ 0000000000 1 1 4 68 00000o0000 1 1 4 6~ 0000000000 1 I 4 68 0000000000 1 1 4 68 0 (,) t) 0000000 ! 1 4 68 0000000000 1 I 4 68 0000000000 1 1 4 6¢ 00000()0000 ' 1 I 4 68 0000000000 1, 1 4 6 ft 00 00000000 ! 1 4 68 1 ! 4 68 0000000000 :1 ..!, 4 68 0o00000000 ! 1 4 68 O000000000 1 1 4 68 00()0()00000 1 1 4 68 O00OO000oO l i 4 68 0000000r~00 I 1 4, 68 00o0000000 ,j LIS Tane Verification I,istin,~ 8chlumberuer Alaska ComputlDn Center 6-AUG-1991 3.8:26 PAGE: AP1 API PF CLASS MOD 0 0 o 0 9 1 1 4 68 0 00 0 9 1 1 't 6 B 0 O1 0 9 1 1 4 68 0 O1 0 9 1 1 4 68 0 O0 0 9 1 1 't 68 () 00 0 q ! 1 4 68 o O0 0 9 1 1 4 68 0 00 0 9 1 ! 4 7 3 9 O0 0 9 1 1 2 79 0 O0 0 g 1 1 2 79 0 O0 0 q 1 1 2 79 0 O1 0 9 1 1 4 68 0 41 0 9 1 I 4 68 0 ~ 0 0 9 1 1 4 ' 68 0 04 0 q 1 1 4 68 2 01 0 9 1 I 4 68 2 O1 0 9 1 1 4 68 2 01, 0 g I 1 4 68 2 01 0 9 1. I 4 68 0 O0 0 9 ! 1, 4 68 0 O0 0 9 1 1 4 68 6 21 0 9 3 I 12 6R 2 B3 0 9 3 I ~2 68 2 F;J3 0 9 3 1 1.2 68 0000000000 000o000000 00nO020000 0000020000 0000000000 0000000000 000000()000 O00000r) O00 O0000OOO00 000()000000 0000000000 0000000000 0ohO000000 000000000o OOOO0OO000 0000000000 OOO0000000 00(')0000000 00()0(')00000 0000()00000 0000000000 00 ()0 t) 00 O00 0 (')0 000 0 O00 ()O00000OO0 TT1 DITg US 07 52~ 83 0 9 3 ! 12 68 0000000000 TT2 DITE LiS 07 522 83 0 9 3 I 12 68 O0000OO00C) ,$ ** DATA DEPTH = 13274.500 FEET ** TT~.IE. DITE 0.000 B$.DITE 8.500 FCD.DITE 0.000 CS.DITE CVET,. DITE -30.3! 1. T E N S, !) I'.!.'.' E 2075.000 HTEN. L)ITE -0.957 E',PlM. DITE l'rq'. DITE (.m) , () 0 () ~,~AR K, DI'I'E 72,0(.)0 RFOC.DITE 0.223 XFOC.DITE IgO~'. DIq'E (). go('> 1 ~,0F. [)l'r ~ o.000 SF'OF. DITE 0.000 FTVP.DITE FTVZ.DITE 0.010 DIHV.DITE 243.196 RD IH.. I)ITF, 229.287 RRFO.DITE RXFO.DITE 0.05,4 RPSD.D]T~ 1.831 EPSD.DITE 2.197 XPSD.DITE iPSD.{)ImE 2.207 IRMA.D]'TE 0.015 2IRP.DITE 2.192 IRDA.DITE 2TXP. I')ITE 2.2!2 VODC.DITE 4.619 IWF1.DITE 2,031. IWF2.DI~E I NDB. DI',P~: 3.6ql 15v'r,DITE 4,648 25VT.D!TE 2.339 S2iV.DITE 15VS.DITE 4.624 HV.DITE 245.940 ITEU,D!TE 147.424 RITE.DITE CTE~. [)ITE 157.100 g'I'EM. DITE 156.~49 AMTE,DITE ~56.849 CDCR.DITE CDCX.DITE7 -3~.7Q() IIND.DITE ~55.933 ll. XD. DIT~i 70.520 C[)[,R. DITE CDI,,X. DITE -32.227 C~C~. [)ITE 413,748 CMCX,QITE 91 .~09 ITR~.DITE I IX).'~. DITE 29,960 CNLR.DITE 414.193 C~I!,X, OITE 99.356 CIDP.DITE CIMP.DITFm 436.472 DC.ID.DITE 0.000 DCIM.DITE 0.000 C1LD.DITE C I I,~. DI'TE 436,903 CSFA. DITE 401.970 CSFb. DITE 401.970 DCSF. D ITE I RF)~'). DIT~' 1779.~36 IXDH. DI'TF, ]785.q67 IRDP.DTTE !776.103 ],X[)P. DITE R TRD. DITf~'. 336.065 RIX[).DITE 3.754 IRDZ.DITE -9.898 IXDZ.DiTE 1818.641 0.000 0.023 3.774 0.430 1.831 0.020 2.031 0.020 140.984 352.643 345,316 404.465 450.838 451.4~5 0,000 228.106 -9,888 [,,IS Tape Verlf, Jcatlon l,istlhq ,(~ S, chlumberqer Alaska Computj, no Center IP~l. Bi'rE 3231.383 IX~N,D]T.K ~ R Ip~. DI'I'E 30q,492 PlX~q. !')[TE IDPW. BITE 2,21 ~ J', ~PH, DITE 5~bA.PlTE .2.498 SPI,U. D/'TE SWC.DITE 9.939 SFBP.I)ITE ~ S~CP.DI'rF ~ 1.693 RSFC.!:)~T~: SP.DITE; -20.000 SP~R.I)ITE SFVP.~ITE 3o5.4n9 PSFV.nITE RSP~. PlmE 0.3V5 SPDP. I) ITE ~ D~TS.[)iTE C, DECb. I')ITE SPltI.DImD 26.380 SVEL.1)ITE AFCP, ~I ~E O. 000 ABS. D I TE RGP. P ITF 101.333 dR. I.)ITE ~ TT4. DI. TE -999. 250 'I'TI. D,ITE DEPTH = !2644.500 FEET TTt~F,DITE 1,075,250 BS,DI'rE CVE'.L. BITE -27.50~ wENS. L)!TE T 'J,' T. t~ i 'r E (.). o 5 '~ ~ A ~ K. P I '.I: ~7 IDOF,~ImE 0,000 !~40F. PI'rE FTVZ.DImE 0.015 DINV.DTTE RXF~.DITE J. ,833 RPSO.DITE IPSO.BITE 2.207 I t~ ~ ~. [)I'.!.'E 21XP.DITE 2.193 VODC.DITE IND¢. PI'rE 3,945 15VT. L>ITE 15VS. OITE 4.6 14 NV. DITE CTE~. D I'['E 166,1,00 ~T~Ij'4, D] TE CDCX.DI'rE -546,555 IIRD.P!TE CDL, X. DIT~ -535.233 Ci',4C~. DJ TE I l'Xt,4. BITE 1687.362 C~'!LR. I)ITE CIMP.DITE -563,262 DC]D.D'ITE C!l,~. BITE -59o.253 CSF'A.D!TE I R D ~.~. D I W E 1. 762.7 fl 2 '[ X P N. D 1' ',rE RIRr~.DITE -27.494 RIXD,DIT~ IRM~,~. BI'rE 3234.234 1' XMN. DI'I;E RIR~.BI'rE -40o.856 IDP[~, BI'rE 13,g05 I~P~t. D1TE S~'bh. t) ITE 9700. ooo SFI, U. DITE SFC,DITE 0.233 SFBP.!)!TE SFCP,DITE 11,657 RSFC. I)IT~ , . 0 . . SP.OI'PE -48.625 ~PAR DITE SFVD.DITF 304.571 ~SFV. DI'I'F~ RSDA.DIq'E 0.375 SPDP.DITE DETS.DITE 0 DECL.DITE SPHI'.DITE 7 855 SVEh DII , gFCP. BITE 0. 000 ~gS. DITE R(;¢. DImE 46.949 GP. DI TT~. DITE 284. ooo TT 1. BITE ** END OF DATA 6-AI.1G-1991 1~:26 31.83.616 I ~lu, P. BITE 3226.979 141 .019 1RmZ,DTTE -7.066 2'. 291 I LO. OI1'E 2.2 15 2.488 ~,~RES.oT'rE O. 150 562.431, RSFB. DTq'E 29.202 8,692 SFCZ.OITE -0.073 -20.000 SPD.DITE 559.000 1 !.254 SFVZ.DITE 0.769 946.167. RSPD.DITE 514.859 2 O E C $. 91 ",!' E 6 ~ 44 0319, o 16 DT. BiTE 96. 900 0.394 IHV.I)ITE 0.o00 105,102 lA,BITE -999.250 -999,250 TT2, [)]TE -999,25(-) 8.500 FCD.D[TE 5660,000 HTE?4.DTTE 72,000 RF()C,DITE 0.000 . SFOF.DITE 241.193 R~I H. DI I"F: !,826 EPSL),DYTE 0.020 2IRP.DITE: 4..634 TWF1 .DTTE 4,629 25v'r. L)I'.t'~ 245. 940 I'I'E~.~. BITE 1,53.249 A~TE, O I'!'E 69.324 I IXD, DI'I"E -57~,487 CMC'X. BIT?. -610.094 C~[,X. BITE O. 060 DCT~, DI',[E -534,898 CSFL,OITE 1771,095 IRDP,DITE -542. 000 IRDZ. 31.86.722 IRMP. DITF., 1714,354 IR~Z.DITE 1950.000 ILD.D!TE 9700.000 ~,tRES, BITE 561.897 PSF'B. BITE O. I 54. SFCZ, -48,625 SPD. D l I'F, 0.535 SFVZ.DITE 940,700 RSP[:.:, !)I TE 0 DECS. DITF, 5612,8C) .1. DT. DI, TE 0.394 IHV.DITE 49,1~5 1 h. DI'['E 426,000 TT2. l.)l TE 0.000 599.629 1.. 502 0,000 227.117 2.236 2.1.92 2.026 2.329 154.465 ,153. 327 -4.32.~71 1.759.4,23 1757.855 0.O7O -596.664 1759.999 -10,074 3229,668 -7.547 12.366 0.151. 1.90.777 -0,074 547.419 0.719 499.~30 7360 ' 64. 050 0.000 3 5 2.5 (') 0 289.200 IX~P.DITE IX~Z.DITE I[,,g.DITE SFB.DITE SFBZ.DITE SFV.DITE SPDF.DITE RSP.DITE SPDZ.DITE DERS.DITE ARE~.DITE ICV.DITE TT3.DITE CS,BITE ETI:M.DITE XFDC,DITE FTVP.DITE RRFO.DITE XPSD,DITE IRD~.DITE IwF~.OITE S2IV.DITE RITE.DITE CDCR.DITE CDLR, BITE I IP~. BITE CIDP.DITE CII, D. DITE DCSF.DITE I×0P.DITE IXDZ.DITE IX~P.DITE IX~IZ.DI, TE ILM.DITE SFB.DITE SFBZ.D1TE SF¥.DITE SPDF.DITE RSP.DITE SPDZ,DITE DERS.DITE AREA.BITE ICV.DITE TT3,DITE PAGE: 517.455 -16.671 2,289 28.124 1.006 10,441 -20.009 595.250 -31,849 252 0.000 0.000 -999.250 1650.494 1322,148 0,968 3,770 2,834 1.826 0,015 2.026 1.860 147.488 ~9.807 48.593 -619,484 72.438 80,865 0,565 -234,206 -8,930 -3O7.440 -16,857 1950.000 188.883 1.89i -0,184 -45,528 566.625 -34,749 ,132 0.000 0,000 426,000 · $chlumberqer A 1 asKa ComDut in¢.l Center 6-AUG-J9gl 18:26 ,0 SERVICE blAME .' F'nI'I'F; D zt'7' P : gl/OR/05 ~)P T.G] !',{ : T~PF~ t,;AM.E : DEFAUUT CCl~',i'~' 1. NII A T I ON# [.~REV IOUS TAPE COr,:~;'~','T · PROCESSE'.I) P.Y SC}.fDU~RKRGER D(,IS TO I, IS C'l ., . .............. ,.-, N V F..]R'r E R I. ITI bITY **** REEL TRAILER SFRVlCE Nt~ME : DIWE DATE : 91108105 ORIG.[N : OUTS R~E[, NA~4E', : OEF'AU[~T PR E %' I OI..;S RE:EL, CON~NT : PROCE:SSED BY ~CH[,IJ~BERGER D.LIS TO [,[~ COHVETRTER U'.['.I[.,ITY O, **** REEL HEADETR SP..RVICE NACRE : OIT.E DAq.'F' : 91108/05 [)RIClN : CONI'INI/ATION ~ : 1. PREVIOUS REEL : COMMENT : PROCESSED BY SCit[,U~BE~GE',F' PI, IS TO LIS CONVERTER UTI[~I~'.rY **** TAPE HEADER **** SFRVICF.: NAME : DATF : 91/0~/05 ORIGIN : CONTIN(;~T.ION ~ : 1, PPEVIOUS TAP~; COMMENT : RROCESSED BY SCH[,[iMBERGER OUTS TO LIS CONVERTER ~'rILITY PAGE: LIS Tape Verification l~lst'Jno SChlUmberqer AlasKa Computlnc Center 6-AUG-I, 991 18:26 **** FI[,[': HEADER S F, p, V I C P: : ,] 0 B VERSION : 4B0-!6q DaT~': : 91./08/05 ~aX REC SIZE : ~.[92 FTI.,~ TYP[{ : DL LAST FILE : I i ** DATA FORNAT SpECIFI¢.':ITI(]N REC(]RI.) *'* 1 2 66 0 3 79 542 4 66 6 73 0 7 65 I N 8 73 60 9 65 1 IN ..~ ~ ~ 12 68 -999, !3 66 14 65 .I, IN !5 66 73 '!.6 66 0 66 I ** SET T'YPE - CiiA?,! ** Fi~ ........... ~;~ ........... ~;-..~"' ..,. ,. -~;.:.,-- ...... ~: ........ ;~ ~ ..... ..................................~..-. ~,~ ,s ~ 6~ ')':..~ ~ ........ .~o ~. .............. ~ 4 ~.. ......... oooooo,.'5~"'o BS Dll'~:: l]N 07 282 01 0 ]0 1 1 4 68 0000000000 07 282 01 0 10 07 636 2!. 0 10 07 636 nO 0 !0 07 635 21 0 10 07 000 O 0 0 10 07 63~ 21 0 10 07 520 07 150 07 900 00 0 10 07 000 O0 0 10 07 000 00 0 10 07 000 O0 0 I 0 1 4 68 1 4 68 ! 4 68 .1 4 68 I 4 68 1 4 68 1 4 68 1 4 68 1 4. 68 1 4 68 ! 4 68 1 4 6~ 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 000000000¢) 0000000000 0000000000 0o00000000 0000000000 PAGE: LIS wade Yeri..tJcatlon LlstIno Sc.blumberqer Alaska Computtno Center 6-~UG-I. qg! 1,8:26 ,0 Ir) ORDER ff l,(iG TYPk: CLASS MOl) NOMB S~MP EL, EM CODE (HEX) SFOP D!TF: ~0 . 1 68 n . On000 FTVP DITE V FTV? nlTF: DTI{V D~TE V RDIU I)ITE V R~F'O OITE V RXF~ DImE V EPSD DImE XPfiP l.)I TE IPSr~ DITE I~DA DI'rF 2IXP DITF; VODC DITE IWF1 DIVE IWF2 DImE 15yin P/l'E 25VT D%TE S~IV DI'rE 15rS DIT~7 HV D I'.rg I T E~.,! D ~'.P g RITE !)Img DEGF CTE~ DImE DEGF MTF.~ DImE DEGF A~'.I'W DITE DEGF CDC~ DITg C~4L~ r)lmE CIMP DImE DCID I)ITE t)CIY DITE CTI,D DImE CTLt,~ DITE CSFn DITE DCSF DITF~ 07 000 O0 0 10 1 1 4 68 0o00000000 07 00o on 0 10 1 1 ~. 68 00o0000000 07 000 O0 0 10 1 I 4 68 0000000000 07 000 00 0 I 0 1 1 4 68 0000000000 07 000 O0 0 10 ! I 4 68 0000000000 07 n00 00 0 10 1 1 4 68 0000000000 07 000 00 0 10 1 1 4 68 0000000000 07 O00 o0 0 10 I l a 68 0000000000 07 000 00 0 10 .1. 1 4 68 0O00000000 O7 000 O0 0 10 1 I 4 68 000000(~000 07 000 00 0 10 I 1 4 68 00gO000000 07 000 O0 0 ! 0 1 1 a 6~. 0000000000 07 , OOO O0 0 lO 1 I 4. 6,~ 0000()00000 07 0go O0 0 I 0 1 1 4 68 0000000000 O7 o0o ¢)0 0 !, 0 1 1 4 68 0000000000 07 () 0 (.) O0 0 10 1 1 4 68 000000O000 07 000 O0 0 1U I 1 4 6[] 0000000000 07 000 00 0 I 0 1 1 4 68 0nO000()000 07 000 O0 0 10 1 ! 4 68 0000000000 07 000 O0 0 10 1 1 4 68 0000000000 07 000 oO 0 I 0 ! 1 4 6[~ 0000000000 07 000 0() 0 !, 0 1, 1 4 68 0¢)00000000 07 OOO OO 0 10 1. 1 4 68 0000000000 07 000 00 0 10 1 1 4 68 0000000000 07 000 00 0 10 ! ! 4 68 0000000000 07 000 00 0 10 1 ] 4 68 0000()00000 07 000 o0 0 10 1 1 4 68 0000000000 07 000 O0 0 10 1 1 4 68 0000000000 07 000 O0 0 10 I I 4 68 0000000000 07 000 O0 0 1,0 I 1 4 69. 0000000000 07 000 O0 n 10 .1 1 4 68 0000000000 07 000 O0 0 10 I 1 4 68 0000000000 07 OOO O0 0 10 1 1 4 68 0000000000 07 000 00 0 !. 0 1 1 4 68 0000000000 07 000 00 0 10 1 1, 4 68 0000000000 07 000 O0 0 10 1. 1 4. 68 0000000000 07 000 00 0 10 1, 1 4 68 0000000000 07 000 00 0 10 1 1 4 68 0000000000 07 000 00 0 !,0 I I 4 68 0000000000 07 C)00 o0 0 10 1 I 4 68 0000000000 07 110 46 0 10 I 1 4 68 0000000000 07 .ilo 44 0 1.0 1 ,'1 4 68 0000000000 07 000 nO 0 .1.0 1 !, 4 68 0000000000 (')7 000 O0 0 l0 1 1 4. 68 0000000000 07 110 46 0 10 1 I 4 68 0000000000 07 ! 10 4,4 0 10 1, 1. 4 68 0000000000 07 2!0 O1 0 10 1 ~. 4 6~ 0000000000 07 210 O1 0 10 1 I 4 68 000000O000 o7 000 O0 0 10 1 1 4, 68 0000000000 07 000 00 0 10 i 1. 4 68 0000000000 PAGE: Tape Veri. fication List.~nq SChlumberger Alaska Computln(l Center 6-AUG-~ 991 1B:~6 PAGE: NAN EP, V UN.IT SERV']'CF; . /~.PI API I!,M NU~R N~IF~H $1 S ID ORD[!;R # I, OG 'CYPR CDASS M[)D NUMB SA~P FIUEM CODE (HEX) IXD DI'rE D4~ 0~ 000 0(.) 0 10 1 1 4 68 0000000000 IRDD DITE RIRD DIq'E ~tM RTXD DI'PE I PM~,~ DITE IX~P Dl'f'~ ~AM/M R T R ~,': DITE RIXv DITE M~/~ IRMZ DI'PE ~:~/M IX~Z D I'.PE ID[)~ DITE I~PH DL!.'J'E OHMD', IY,D D1TE II,~ DITI!: SF[,A DITE ~ D E.S DITE SFB Olq'E SVC bITE N A SFI:~D D~TE ~ SF[~7, D!TE DX A S~CP PI'TE M~ RSFC DITE . ~'~ S F C ~ ,H ~ I h ~ S P D ! T E ~,~ V SPAD DITE HV SDD DITE Mv SDDV [)ITC MV SFVD DITE SVVZ D!'r[: D4v RSP BITE NV RSpA PI'rE MV RSPD DITE YV SPL)~ DImE MY O ~ T,S D I 'riC DFC[, DIVE DFCS SPliT t) ITE PU SVEI, DIq'[;: FT/S DT D I'.I' E Ug/F ADE~ I)ITE FT2 07 000 O0 0 !0 07 000 00 0 J 0 07 000 00 0 I 0 07 000 O0 0 07 (' 00 00 0 1. 0 07 000 00 0 10 07 000 O0 0 I 0 07 () 00 00 0 !. 0 07 000 O0 0 1.0 07 000 O0 0 ~0 07 000 O0 0 1.,0 07 00() 00 0 .! 0 07 000 00 0 10 07 000 00 0 10 07 1.20 46 0 1 0 07 120 44 0 1.0 07 120 46 0 I 0 07 120 44 0 10 07 222 01 0 10 o 7 22 o 01 0 10 07 000 00 0 10 07 000 O0 0 10 07 000 00 0 ! o 07 000 O0 0 !. ~) 07 000 00 n 1 0 07 000 O0 0 10 07 0 (.) 0 00 0 10 07 000 00 0 1 (} 07 000 00 0 19 07 00 C, O 0 0 1. 0 07 O 1. 0 01 0 10 07 0! 0 01 0 10 07 000 O0 0 I 0 07 000 00 0 10 0 '7 000 o 0 0 1, 0 07 000 00 0 1 O 07 0O0 00 0 10 07 O! 0 01 0 t. 0 () 7 01. 0 O 1 0 I 0 07 000 o0 0 10 07 000 00 0 10 07 000 00 0 1, 0 07 000 00 0 1 C, 07 000 O0 0 10 O7 000 O0 0 10 07 000 00 n 1' 0 07 890 01 0 10 07 800 41. 0 1,0 07 5 20 80 0 10 07 280 o4 0 10 1 1 4 68 0000000000 I I 4 68 0000000000 1 I 4 62 On00000000 I 1, 4: 68 0000000000 1 J a 68 0000000000 !. ~ 4 68 0000000000 1 1. 4 68 O000000000 1 1 4 68 0000000000 1 i 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 1. 1 4 68 0000000000 I 1 4 68 0000000000 1 1 4, 68 0 (> 00000000 1 1 4 68 000000 (} 000 1 ,1 4 68 0000000000 1 I 4 68 0000000000 1 1. 4 68 0000000000 I 1 4. 68 0000000000 l ! 4 68 00o0000000 !. 1, 4 68 0000000000 1 ~I 4 68 0000000000 ! 1. 4 68 0000000000 1 1, 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 1. .1. 4 68 0000000000 I 1. 4 68 0000000000 1 I 4 68 0000000000 1 ] 4 68 oo00000000 1 I 4 68 0000000000 1 .~ 4 68 0000000000 J. 1 4 68 0000000000 1. I 4 68 OOOOOOO000 I 1, 4 68 0000000000 1 1, 4 68 C, O00000000 1 1 4 68 0000000000 1. 1 4 62 0000020000 J. J. 4 68 0000020000 1 1 4 68 0000000000 J. 1 4 68 0000000000 1 1 4 F;8 0000000000 1 1. 4 73 0000000000 Ct. 1 2 79 0000000000 1 1 2 79 0000000000 I 1 2 79 0000000000 ! 1 4, 6R 0000000000 I 1 4 68 O00000000n 1 1 4 68 0000000000 J, 1 4 68 000000000o LIS Tame Verification l.,~ist, lr'~q 6-AUG-199,1, 18:26 Schlumberqer Alaska Computtnm Center ID ID IHV DITE F3 ICV DITE 'I'T~ DITE US TT4 ~ I'r}S US TTI DITE US TT2 DITE U8 .~4[.t ZE I~EPR C $5 ELE,q (?ODE (HE×) 0! 0 '10 1 ~ 4 68 0()00000000 07 2~2 01 0 10 1 1 4 68 0(.~00000000 07 2~,2 O] O !0 I 1. 4 68 0000000000 07 2~2 01 O lO l 1 4 68 0000000000 07 000 o0 0 1 0 ! ! 4 68 0000000000 07 ooo o0 0 10 1 1 4 68 00¢)0000000 07 636 21 0 10 3 1 12 68 0000000000 07 522 83 0 I 0 3 I i2 68 0()00000000 07 522 ta3 0 l0 3 I 12 68 0o00000000 07 522 ~3 0 10 3 ~ 17 6~ 0o00000000 07 522 83 0 ! o 3. 1 12 68 o000000o00 .mmmmmm'mmmmmmmmmmm..m DEPTH : 1306'1.0 T I M Fl. I,, I q' E 0,000 B S CVEI,. D'.r. TE -25.818 TEk'5. ITT.DITE 0.000 ~A~K. IDOP,DITE 0.00,0 IHOF. FTVZ,DITE 0.015 DI[iV. RXFO.PI'rE 0.054 IPS~.DI~E 2. 168 IRMA. 21XP. OI'I'E 2.222 VODC. INDg. DITE 3.'130 ~ 5VT. 15VS. I)IT[( 4,614 ~v Cq'E~,~. DI q'E 166.1,00 CBLX.DITE -4~ ~ 1 9.5 IIXb~.DITE .32,965 C;g¢.DITE 373.0a2 DCID. C!b~.DITE 37a.672 CSPA. I~D~r. DITE 1777.146 I~DN. RTRD.I)ITE 2¢8,31 I RIXD. I~M[". D1TE 3226,979 IXMt,;. RIR~r, BI'rE 331.340 RIXM. IDPu . ;~ I'TE 2.624 !MPH 8Fk, .r)I'rE 3,890 SFL[I. SF'C.DITE 8.837 SFBP. 8PCP.DITE ll.653 RSFC. S P. [~ I T E: - 20. O O 0 $ P A ;; SPV~.DiTE 304,516 RSFV. RSPg .DITE 0,375 SPDP. D~TS, [liTE 0 DF:Cb S¢*~I .DITE ~ 8,252 A F'C D. O .l T ~: (,). 0 n (.) A B S RG;~, ~II'E 43,308 TT4..OI'FE -999,250 TT1 00 FEET 8. 500 ?'CD. [)liTE 0. 000 CS. DITE 3085 000 H'rEN.DIt.."P 456.860.. ETIM,.DITE 'Il, ;000 ~'~F~C. 0 !'rE 0.9..47 XFOC.DITE 0,000 SFOF.DITE 0.000 FTVP. DI. TE 243,060 RDI'H. DI'I~E 228.473 RRF0.DITE 1.831 EPSD.DITE ~.]83 XPSD.DITE 0,020 2IRP.DIT~ 2.222 IRDA.DITE 4.648 iWF'I.OITE 2.007 lWF'P.DITE 4.629 25VT.DITE 2.33a S~IV.DITE 248.280 ITEN.DITE 157.967 RITE.DITE 156.463 Ap~TE. DITE 156.463 CDCP.DITE 315.704 liXD.DIT[C 54.404 CDLR.DITE 357.652 C~'ICX. DI'rE 95.509 IIR~.DITE 357,728 Ca[.,X, DITE 102.637 CIDP.DITE O. 000 DCI M. DITF O. 000 CIbD. DITE 257.0~1 CSFb. D'ITE 257.081 DCSF.'DITE 1784.223 1~ R DP, OI',['E 1773.880 IXDP.DITE -16.598 IRDZ,I)ITE -9.968 IXDZ.DITE 3180.580 IP~P.DITE 3~2].212 IX~!P.DITE 138.~44 IR~Z.DI'rE -7.494 I7MZ.DITE ~.680 I'[,D. DITE 2.612 ILM.DITE 3.;~90 ~RES, DITE 0.~5~ SFB.DITE 561.090 ~SPB,DITE 32.792 SFBZ.DITE 8.56? SFCZ,DITE -0.074 SFV.DITE -20.000 SPD.D!TE 537.630 SPDF.[)ITE 16,872 SFVZ.DITE 0.709 ~.~SP.DITE 940.129 RSPD,DITE 484.432 SP[)Z.DITE 0 DECS. [,)ITE 7344 I)ERS.DiTE 12642,225 DT.DITE 79.100 ARE~.DITE 0.394 1HV.DITE 0.000 ICV'.DITE 44,919 iA,DITE -999.750 TT3.DITE -999.250 TT2. DI'TE -999.~50 PAGE: 1549.053 0,000 0.021 3.770 0,479 1.826 0,015 2,.017 0,.015 146.082 301,262 294,996 348,270 381.154 382,890 0.000 241,862 -10.048 544.781 -16.811 ~.669 31,768 1,020 16.1.39 -19.992 555.563 -34,894 172 0,000 0,000 -999,250 10 Tape Verification I.,.i. stfnn $chlumber.aer Alaska Comput. f na Center 6-AUG-1991 1FI :26 PAGE: 11 DEPTH : 12633.500 FEET TTMF:.D!TE -999.250 CuEI,. DI'rE -999.250 TE N,S. I'> 1~ TI~ ITT. r',I TE -9~g. 250 MA~K. I'>ITE ~ IDQF.OITE -999,250 IMOF.D]TE FTVZ,0ITE -999.250 DI~V.DITE RX FO. DI',!'E -9q9. ~ 5('.} RPSD. t')TTE ~ I P s D. D I ~' ~1 - 999.250 21XD.DITE] -999.250 VODC.DITE IN[)P. DITE -999,250 15VS.OITE -999.~50 HV.D!TE ~ CTE~ .DITE -9~9.250 CDCX.DITE: -999.250 CD!,X. D I'['E -999.250 C~ICR.DITE IiX, .DIME -999.250 CrqLR,DITE ~ C~ p.9ITg -999. 250 , DCIO. DI'.rE CI !,,,~, DITE -909.250 CSFA. DI'J'E IRDN.DImE -9q9.250 l XDN. D I.'I'E R!RD.DITE -909.250 RI'XD,DITE RTa~.DITE -999,250 RIX~!. I)ITE IDPN.DImE -999,250 I~iPH. 1~,I TE SFI,~ A. O I'I'E -9o9,250 SFI,,U. L)ITE ~ SKC.[>ITE -999.250 SFBP.DI. TE SwCO.DITE -909.250 RSFC.D!TE SP. DITE -999. 250 SP~R. I)! TK SVVP.DITE -999,250 ~ RSP.~ .DITE -999,250 SPI)P.D!TF D~TS.D'ITE () I)ECL. [)!TK SPiiT.OITF: -999.'250 SV~TI~. l)l T~ AFCD.hI, TE -999.250 ABS.DITE ~ PGP.PITF.: -999,250 GR. I) ].'.r E TT4, DJ. TE 279. 200 TT 1.1') I '.F Fj -099,250 -999.250 -999.250 -999.950 -Q99 ?50 -~991950 -999.250 -999.250 -999.250 -999,250 -q99.250 -999,750 -999.250 -999.~50 -999.250 -999,750 -999.250 -999,250 -999.250 -999.250 -999,750 -999,250 -999,250 -999.25O zSO -999,~' -999,250 -999.~5o 0 -999.?50 -99q,250 -!~96. 393,600 -999.250 -999.250 -999.250 -999.250 -090.250 -999.250 -999.~50 -999.~50 -999.250 -999.250 -999.~50 -999.?50 -999.?50 -999.?50 -999.~50 -999.250 -999.~50 -999.~50 -099.250 -999.~50 -999.250 -999.~50 -999.P50 -999.250 -999.~50 -99~.~50 0 -999.250 -999. 250 353. 000 282.400 CS.DITE ETI'~ ,DITE XFOC. F)ITE FTVP. DI TE RPFO.D!TE XPSD.DiTE 1RDA.DITE IWF2.DITE $21V.DITE RI?E,D1TE CDCR.DITE CDL~,DITE IIR~,DITE C!DP.DITE CI[.,D.DITE DCSF.DITE I×DP.DITE I×DZ.DITE IXMP.DITE IXFZ,DITE II,~. DITE SFB.DITE SFBZ.DITE SFV,DITE SPDF.DITE PSP,DITE 5PD~.DITE DERS.DITE AREA.DITE ICV.DITE TT3.DITE -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999.250 -999,250 -999.~50 -999,250 -999,250 -999.250 -999o~50 -999.~50 -999,250 -999,250 -999.250 -999,~50 -999.250 -999,250 -999,250 -999,250 -999,250 -999,250 -999.250 -999.~50 0 -999,~50 -999°250 392.800 I ** END OF DATA I I **** glt, C TRAIbgP FILE }~JA.,'.tf.": : DI'I'E .010 s~nv It}{: : JOB VER~!ON : 4B0-169 DATE gaX I{EC SIZE : FILF TYPE : Db LAST FILE I I I, IS Tane Ver]f:icatton fJistln~ · Schlumberaer Alaska Comput~nq Center 6-AUG-1991 18:26 SF. RVICE N~,~E : FI)ITF, DATF : 91/0~/O5 OPlGIN : T~PF NA~E : DE~FAi..II,T PREVi~3US TAUE C~,~.~i,]NT : PROCESSED BY ,5CI~LtI~,~BERGER DLIS T(3 LIS CO~VERTER UTILITY **** R ~]EI, TRA I T~E'R **** SERVICE NAME : DITE ORIGIN : DLIS REEL ~',.IA~E] : DEFAUf,T CONq'J. NU~T~ON ~ : RETV Ir)IJS REEL : O~UENT ~ PROCESSED BY SCllLUMBERGER lpLIS TO [,IS CONVERTEP UTILITY ,0 **** REEL HEADER **** SE:RVICE ~A~E : D[TM DATE : 91/U~/05 OPIGIM : DLIS REEI~ RAgE : DEF'AU!~T CONTIMUa'FJiOr, I # : 1 '~ pREvIOUS REEb t CO,MICET : PROCESSED BY SCI'{I,Ut~BERGER DJ, IS TO LIS C{')NVFRTER UTILITY SERvICK r'~ h uF : [)P IGI rl : Bt,, I S TAP~" t, IA~4E; : Ok]FAUI.,,T PREVIOUS TAPE' ~ "r ..... I E ., CO~lgEr,I[I' ., : P!.q.)CEoSED BY SCHt, k,~BERG R DLIS TO LIS C(')r~VER'PER UTII.,ITY **** F I i..,E }.lEADER **** FTLF r'iAl','~E '.. D[T[": .011 SERVICE : VER$ rf]r,a : 4B0-1.69 DhT~ ~hX REC SIZE : ~{1.9~ FTbt~ TYPl~ . : Db LAST FIhE : PAGE: 12 [,IS Ta~e Veri.(!~cation '~ SchlUroberc~er hi. ask,3 Comp,~tinq Center 6-AUG-1991 1. B:26 ** DATA I'rORHAT SPECI'F!CgTION PECORD ** 1 66 3 79 542 9 6[5 .lin 1~ 66 15 ! 2 6~ -999. 13 66 1 15 66 73 16 66 0 66 ** ,gE'l' TYPE - CItAN ** ' "' . PROCESS ].D ORDER , l.,rl('; TYPE CLISS ~IO[) NUM[t S~,?P EI.,E?.I CODE (HEX) TINE pi'rE t'48 FCI) BITE I.~3 CS DITE F/HR CVE!., DI'rE F/MH TENS r)ITE LBF [ITEN DITE LBF ITT DITE S R~OC ~I'rE V XPOC Bt'rE v IB()F [~ I'"E S~QW DIT~; FTVP [)I'r[ V F~VT. hi'rE V Dl'!,.~V DITE V RDl'n p.l, Wg V RRFn DI'PE V R~F'O PlTE V XPSr¢ DI'PE ()7 636 ?1 o 11 1 I 4.. 68 0000000000 07 282 0 t 0 1 It t. 1 4 68 0000000000 07 282 O1 0 11. 1 1 4 6tq O00OO00000 07 636 21 o 11 I 1 4: 68 0000000000 07 636 O0 0 11 1. 1 4 68 0000000000 07 6.35 ?,1 0 11. 1' l 4 68 0000000000 07 OOO O0 0 1 l 1 1 4 6[4 0000000000 07 636 ~1. 0 I 1 I ! 4 68 0000000000 o7 529 8.2 0 ! 1 I ! 4. 68 OoO0OO0000 07 150 Ol 0 11 1 ! 4 68 t)O00000000 07 000 O0 0 I l 1 1. 4 68 0000000000 07 000 O0 0 l 1 1. 1 ~ 68 0o00000000 07 000 o0 0 1. l 1 I 4 68 00000000o0 07 00o O0 n 11 1 1 4 68 0000000000 07 00O nO 0 1 I 1 ] 4 68 0000000000 07 009 O0 0 l 1 I 1 4 68 0000000000 07 000 O0 0 11 I I 4 6~ 0000000000 07 000 00 0 11 ! ! 4 68 0000000000 07 000 00 0 11 !. I 4 68 0000000000 07 OOn O0 0 I ! ! 1. 4 68 0000000000 07 OC)O O0 0 1. 1 I 1 4 68 0000000000 07 000 O0 O I 1 1 1 4 68 0000000000 07 00'.) O0 0 .1. 1 ! 1. 4 68 t)O0000()O0¢) 07 0(}0 n0 0 11 !. I 4 68 000000000o 07 000 O0 0 11 1 I 4 68 0000000000 07 OOO O0 0 11 1. 1 4 68 O00000000O PAGE: LIS Tape. Yerificat~on SchlUmberger Alaska Comput!nn Center 6-AUG-!99~ IR:26 PAGE: 14 mM~mN#M M mmmM~m~! e ~mmm mm M ~m m m m ~mmMm~ ~mmm~m ~e m ID ORDER It l.,~(; TYPE Ct, ASS MOl) NUMB SAMP EUE~ CODE (HEX) -' ............................. 555'"5 I~t:,a DITE 07 000 O0 0 il 1 1 4 6a 0000000000 4 68 0000000000 4 6.8 0000000000 4 6~ 0000000000 4 6~ 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0080000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0Oo0000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 6H 0000000000 4 68 0000000000 4 68 0000000000 4 68 000000 () 00 o 4 68 0000000000 4 68 0oo00o00o0 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 00()0000000 4 68 00000o0000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 OOO0000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 00o0000000 4 68 000000000o 4 68 0000000000 4 68 0000000000 4 68 0o00000000 4 68 0000000000 4 68 00000000o0 4 68 0o000o0000 4 68 0000000000 4 68 0o000o0000 I.,?S Tape Verification T..,istlnn ~ $chlumherqer Alaska Comoutino Center 6-AU(;-1991 I~:P~ PAGE: 1.5 ; ........ ;; ............. .7aoO 0 1, 1 07 00 fl 00 0 1 I 1 !. 07 000 00 0 11 1 1 O7 12(3 46 0 1! I !. 0 '7 120 07 120 07 120 44 0 1 I. 1 21. 07 222 O1 0 1 l 1 1, 07 220 O1 0 11 1 1 07 000 00 0 1 ! 1 1 07 00() O0 0 11 I .1 07 000 O0 0 11 1. 1 0 7 0 O () 0 O 0 U'l 000 O0 0 11 1 07 o o 0 () 0 0 11 I 1 07 0 O 0 00 0 1 I 1 1 07 00 () 00 0 11 1 I 07 000 O0 0 11 1 1 07 000 00 0 11 I 07 OlO Ol o 1. 1 I 1 o 7 01 ~) 01 0 11. 1, ! 07 00(.) O0 0 ! 1 1, 1 07 00 ~) o 0 0 11 1 1 07 O 00 00 0 11 1 o 7 00 () 00 0 11 1 1 07 000 O0 0 () 7 010 01 0 I 1 i 1 () 7 01 () 0 1 0 11 1 1 07 000 00 0 11 1 1 07 000 O0 0 11 1 I 07 000 00 0 11 1 o7 00o O0 0 1 I. 1 1 .o 7 000 o 0 0 1 I 1 1 07 O 0 0 0 0 0 11 1 07 00 () 00 0 1. 1 1 07 ~ 9 0 () 1, o t. 1 1 1 07 8~}f) 41 0 11. ,) '1 5 ? 0 R 0 0 11 1. 1 07 2~0 04 0 1,1 1 l 07 282 al 0 11 ] I 07 2R2 O1 0 11 1 1. 07 282 01 0 11 I 1 07 2R. 2 O1 0 11 1 07 000 O0 0 1 1 1 1. 07 00 0 00 () ! 1 1 (.)7 636 21 0 ! 1. 3 1 07 522 83 0 1 i 3 07 522 83 0 11 3 1 t..) 7 5 22 R 3 0 11 3 1 P. 7 5?..2 a3 0 11. 3 1 Nl;t ~ SIZE. RF. FR 0 $hMP ELEM CnDE (HEX) ...................... [;, ; .... 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 6 B 00 n c) 0000 00 4 68 0000000o00 4 68 0000000000 4 6fl 0000000000 4 68 0000000000 4, 68 0000000000 4. 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 O000000nO0 4 68 O000000000 4 68 0000000000 ,l 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 OoO0000000 4 68 0000000000 4 6H 0000000000 4 68 0000000000 4 68 0000000000 4 68 00000200O0 4 68 0000020000 4 68 0000000000 4 68 000000(,000 4 68 0000000000 4 73 0000000000 :2., 79 0000000000 2 79 00000o0000 2 79 UO00000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 O()O0000OO0 4 6fl 0000000000 4 68 0000000000 4 6B 0000000000 12 68 0000000000 12 6B 00()0000000 12 68 00o0000000 12 68 00 () 0 C) 00000 12 68 O00OOt)OOOn LIS Ta~e Vet[fi. cation [.,ist:J.n¢] 6-AL1G-1.991 [fl:26 SchlUmheruer Alaska Computfnq Center -~mmmmmmmm~m-~--~mm~m~m~m~em~mmmmmmmm~mmmmmm-mmmm~mmm~m-mmmm#m-~m~m-~m~mmm~m * * D/% T A * * ., {~ ** DEP'r~I = 12749.000 FEET TTNR.D1TE 0.0o0 BS. DI'.PK 8.500 FCI).DITE O.nO0 C,$.DITE CVEI,.lJlTF -26.2~1 TE~]S. [)!TE 2575.000 HTEN.OITE 439.570 ETIM.D1TE ITT. DI!'E 0,On0 MARK. DITF 71 .0o0 RFOC. DI'rF, 1 .5~8 XFOC. DImE IDOF'.DITE 0,O00 I~"~QF. Dime 0.000 SFOF.DTT~; 0.00o FTVP.DITE FTVZ.DITE 0.010 DI}~V.DIT~ 240.14] RDIH.[)ITE ?25.828 RRPO.OITE RXF'O. PI'rE 1,816 RPSr). DI T~7 1.821 EPSI3. {) [TW 2.202 XPSD.DITE IPSO. D.[TE ~.217 .rRr4A. l)!Tg 0.020 2 iep. r)I'r~: 2.197 [pl)g .DITE 21, XP.DITE ~.192 vODC.D!TE 4.624 lWF1 .DITE ?.026 IwF2.DtTE I ~I)~. Dl'a'~l 3.950 15VT.D!TE 4.624 5v'r. 2.329 S2IV.DITE 1AVS DI '"'' . · .... . ~,,. 4 6O9 }tV r)!'r~ 247 11.0 rTE,4 [)'I't'g 154. 148 RITE.DI'rE Cq'g~4. OITiC t70.6o0 u'l'!~'4. D ['rE 152.674 AMTE.UITE 15~.674 CDCR.D[TE CDCY.Di E 544.967 !I*~[).[)!TE 73 761. !IXD.DITE -431.960 CDLR.DITE IIx~.D.t'rE !.641.17a C~[,R.[)I E -579 876 CNI,X.DTT~; 1711.464 C!DP.DI.E CT~P. r~a'{5 -589.253 ~)C [[). DtTF; 0.000 DCIM.DITE 0.r)00 CI Lg. I") I'rE -592.312 CS~ A. DI'.!'K -402.879 CSFL.DITE -402.819 I,)CSF.DITE I~DU. DIq'E; 1766.239 ! XDr,;. !)ITE 17'14.366 IRhP.DITE 1763.636 .[XDP.DITE RIRD.DIq'E -18.913 R'I W~). l.,! T~C -542.000 IRDZ.DITE -10.127 IXDZ,.[)ITE IRMN. oI'r~l 3237.376 IXM:].I~ITE 3191 .701 I[~MP. D!TFI 3~33.904 I'Xh%P. BITE "' ~ ' 1 .... 7.5q4 I X~qZ. D I TE R]',R~.l)lTc~ -4~ ~..'969 P!,Xq.I)ITE 1716 0,~2 IRMZ.DI"E - ., . IDP~. DIT~ 1.2. 469 ~,[MP~. [)ITR 1950 [ 000 I[,O. DITE 12.1 3 ~ IL~.DITE SFL, A. DITF: 9700,000 SFLU. I)ITF: 9700,000 MRES. DI'rE 0.1 50 Srg. DITE sro. r>I,r[.: 0.164 SFBP. D! T~,: 561,568 RS~'~. Dt'r~? 193.~04 SFC¢. D !:'rp,; 1,1.647' RSFC.DITE 0.085 SFCZ.DITg -0.075 sFv.DI'rg sp. DI'r~: -20.000 S'P~R.D~TE -20.000 5PD.DITR 530.392 SPDF.DITE S~Vt~.DITE 304.237 ~s~v. [)I'.r~ 0.498 SFVZ,DITE 0.689 RSP.DITE RSP~. DI'FiC 0.375 SPDP. L)IT~ 939,037 RSP[). I)ITE 481.290 SPDZ..DITE D~TS.DITE () I')ECU. D TTF, 2 DECS,D!TE 6144 DERS.DITE $PI..II.DI'rt~ 13.549 SVEL.PlTE 13986.012 DT.DITE 71.5()0 AR~:A.DITE AFCD [)i'['E 0.000 ARS.DI'r[< 0,394 IHV.DITF: 0.000 ICV.DITE ~c~:r>z*~: 48.ooo G R. [, l'l'r,~ ,49.785 1A.DI'rg -099.250 TT3.DITE TT~,D'[TE -999,250 TTI.[)ITE -999,250 TT2,DITE -999.250 ** DF~PTH : 2q00.500 FP;ET ** TI,4F.DITE -9'99.25() AS. Dl'['r -999.250 FCO. DIT~: -999.~50 CS.DITE CVEI,.DITE -999.250 TEI'~S. D T'r[,: -99q.250 HTEN.D!TE -999.250 ETI'M.DITE 1TT. OI'I,'E -909.250 M Al*K, OI'l'~ -099.250 RFOC,DITE -999.250 XFOC.DI~E T E - ,.. . ,.. · , · ID('~.I.)I 999,250 I[qO~ DITE -99q.250 SFQF,I)!TE -9q9 250 FTVP DIE T FTVZ.DITE -909.250 I)i;t'7. DITE -999.250 RI)IH. O I'I~E -999.250 RRF'O.DITE RXFO. I~ITE -909.~50 RPSr) DITE -999.250 EPSD,DITE -999.250 XPSD.DITE IPSO. D I'rF -999. 250 I Rs A* 0 I'!'E., -099.250 2'IRB . DITE -999 .250 1. RDA . DITE 2IXD.DITE -999.250 VODC. [)I'I'E -999.250 TWF1. DITIE -999,250 IWF2.DITE IND~.DITE -999,250 15VT. DI']'E -999.~50 25VT.DTTE -999.250 S2I'V.DITE 15V~ DIT - .... -999.250 RIT~:.DITE ,~.. tC -9~9,250 HV. DI'C~ 999 250 ITEM CT[<~~ DITE -999.25C, ~T~M.I')I'I'Iq -q9q.250 A~, ~E,.OIT~ 999 ~5() CI.(,.R.DITE CDCX D.I'eE': 99) 250 IIRD DITE 99q 250 IIXI.) DITE qqq.~50 CDLR,DITE CDLX . l) ITE', -999,250 C¢4CR. DI"!'E -999,250 CMCX,OITtC -999.250 '.[ ]'RM. DITE PAGE: 16 1,576.873 0,000 0.960 3.774 2,866 1,.836 0.029 2.026 1,870 147.31,2 54.341 53,033 -589 277 80~202 82.419 0,000 -216..674 -9.250 -278.667 -16.951 1,950,000 191.372 1,816 -O.lgl -19.973 561,875 -35.706 68 0.000 0,000 "999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 -999.250 -999,250 -999,250 -999.250 [,IS Tape Ver.[f.iCatJ. on Llstln~! O SchlUmberger Alaska Computing Center O [1'E -999.25() C CIMP.DITF: -999.290 DCID. D I'!'E CI b~,~. D ITt£ -999.250 I~DN.DITE -9~)9.250 IXDN.[)ITF DITE -9~9. 250 RiX mi'rE -oo9 250 R,,[X~ DTTE r) ITE -999. 250 I ~) I T E - 999.250 S F I, ~. i) I q' E S FC. [') I T~-i -999.~5() SFRP. I.~ITE SFCP.DITE -999.250 RSFC.[)ITE SP.DImE -999,250 SPAR. !.)ITE sFVP.DIT~ -999,250~ RSFV.DITE ~SP~. I'~iTF: -999.250 ~PDP.DIT~ .DITE -999.250 AFCD.DITE -999.25'0 ABS, I')!TE PG~.DiTE -999.250 GR. DITF, D I T E TT~.DITE 280.400 '.i,T 1, . ** END OF I)/~Th ** -999.250 C~[.,X.DITE -999.250 -099 250 DCIM.I)ITE -999.250 -999[250 CS~L.D~'rE -099.250 -999.250 IRDP.DITE -999.250 -999.250 IRDZ.DITE -999.250 -999.250 IR~P,!OITE -999.250 -999,250 IR~Z,DITE -999.250 -999 250 !I,D.DITE -999.750 999~250 ~RES.I)ITE -999.250 -999.250 RSFB.t)ITE -999.250 -999.250 SFCZ.DITE -999.250 -990.250 SPD.D!TE -q99.~50 -999.250 SFVZ.I,)ITE -999.250 -999,250 RSPD.DITE -999.~50 0 D E C S. D I T E o -999.250 DT. I)l'[f -999.250 -999.250 I~V.DITE -999.250 -999. 250 l A. D'['I!E 9 ].. 00O 398.~00 TT2.DITE 285.200 CIDP.DITE CILD.DITE DCSF.DITE TXDP.DITE IXDZ.DITE IXgP.DITE IX~Z.D!TE IbM .DiTE SF~.DITE 5FBZ.DITE SFV.DITE SPDF'.DITE RSP.DITE SPDZ.DITE I)ENS.DITE ICV.DITE TT3.DITE PAGE: -999.250 -999,250 -999,250 -999.250 -999,250 -999,250 -999,250 -999 25O -999:250 -999.25O -999.250 -999.250 -999.250 -999.250 0 -999.250 -999.250 393.200 17 **** F" I bE TRA I'I,ER FII,F ~'IA,',~'E ; DIq"E: .011 SFRvICE : JOB V%~PSIOH : 4130-169 Daq'F' : ql/0~/05 ~aX RPtC SIZE : ~192 FILF. TYPE : DL LaST F I I.,E : TAPE TkAII,ER **** F!AqF: : FD!TE : q'l/O~/05 : D'UT5 q A~.~E : DEFAUbT TAPE : : PROCESSED i.)Y **** REEl, TRAIl, ER SERVICE NA['<!h~. : DITE DATF : ~1/(')~/05 OR!CIN = DI.,'[ 8 REF;~ t~A~l~ : OEFAUE, T pR~V IOtlS REED : COM~.~F:NT : PROCESSED BY SCI-{LI~NBERGER DLIS $C H LIj ~ t~ERGt.'.:R DLIS TO I..,l.$ C{7~I',IVEFYTER UTII.,[TY T('} LIS CONVER'I'ER UTIbITY Tame v¢~rlficatton Listir~q $chlumberoer Alaska C. omputina Center 6,-AUG-19q I 18:~6 SERVICE N~M~ : DITE D~!'~ : 9110~/05 OR IC.[ r'~ : OLTS PEET, NA~E : DEFAULT CONTi[d!IATIO~ ~ : l"' PPEvIOI~S RE~I~ : CO~EH!' : PRUCESSE9 BY SC~tl,[.IML~ERGE~ DblS TO LIS CONVERTER IITIL[TY SERVICE N A ~.~ w,, : DAT~" : 91108/05 OPIGIN : PI, TS TAPF NA~.~E : I.)F;FAII[,T PREVIOUS TAPE Ca~F~NT : PtiOC~SS~:D DY 8CHI,t. IM~tERGER DblS TO LIS CONVERTER IITILiTY **** FII~E HEADER **** FTbF, MA~t.i : DITE .013 SRRVICE : SPL'[CE VF. RS3'.[]~I : 4~10-166 DATF : 91/(.)~/05 MAX REIC SIZE : R192 F!I,~7 TYPE : Db LAST FILE DATA FOR~,]AT SPECIFTCATI[')N RECORD ** PAGE: 18 [,IS Tape verl. ficatJ, on [,lstJnq $chlumbero, er Alaska Computino Center 6-AUG-1. 991. PAGE: 19 ,0 0 ! t3 S FCD DITE IN CS DITE F/HR CVEI, DITE F/NN TENS D!~'E I.,BF HT~N ITT D1TI~ S M a R ~ D I T E F XFOC ;)ITF.: Y IDO~' I~OF' DITE SFOF DITE FTVP bITE V FTVZ DITE V DIHV D!TE v RDIH DITE ~PFO DITE RPSD DIT~ EPSD DIT~ XPSD D!'FK IPSD ]: P N,~ D 1 I'F, 2TRD IRDA DImE 2TXP DITb: VODC DI'rK I w F 1 D I T IwF? DITE IND~ DITE 15VT DITE 25V~ DITE S~IV D1TE HV DI'FE V ITE~ [)ITE DE(;F RITE D!TE ..... CTEg DITE [)EGF A"TK D l T F..: ITRD DIT~: ~,~/~ IIXD CDLR D I TF': CDLX DiTE CMCR !) ! q'E (~7 ?82 O1 0 1 C! I 4. 68 07 29,2 O1 0 tl 1 1 ~.1 68 (..'.7 636 21 0 1 1. 1 4 68 () 7 636 00 0 I 1 1, 4 6 a 07 635 21 0 1 1 I 4 68 07 00 O' t') 0 0 1. 1 1 4 68 07 636 21 0 1 1 1 4 68 o7 52~:~ [~2 0 1 I 1 4 68 07 1.5(~ O1 0 1 1 I 4 68 07 000 00 0 ! 1 1 4 68 07 00 U 00 0 1 1 1 4 A 8 ('37 000 00 0 I 1 1 4 68 0 ~ C, 00 00 0 I ! 1 4 68 O? 0()0 O0 0 ~ 1 ~ 4 68 :? 7 000 00 0 1 1 1 4. 68 (', 7 (!t~ 0 00 0 i 1 1. 4 68 07 000 00 0 1 I 1 a 68 O 7 000 00 0 1 1 I 4 68 () 7 00 (} 00 0 I " I ~ 4 68 07 000 00 0 ! 1. 1. 4 68 o7 0oo 00 0 1 ~ 1 4 68 07 00 0 00 0 1. I 1 4: 68 07 000 O0 0 I !. 1 4 68 07 00 t) o 0 0 1 I 1. 4 68 07 000 00 0 1 1 ! 4 68 O 7 00 () 0 (., 0 1 1 1 4 68 0 7 0 0 0 0 0 0 1. I 1 4 6 8 07 () c 0 0 o 0 I !. 1 4 68 07 000 00 0 1 1 ~ 4 6 R 07 () 0 ~ o 0 0 1 1. ! 4. 68 07 000 O0 0 ! 1 1 4 68 07 00 (.} 00 0 1 1 I 4 68 0 ? 0 (') 0 00 0 1 1 ! 4 68 07 000 00 n 1 1 1. 4 68 07 no0 o0 0 ~ 1. 1 4 68 07 000 00 0 ~ 1 1 4 68 07 000 00 0 I 1 1 4 68 07 000 00 0 1. l 1 4 68 07 00 (~ 00 0 1 1. t 4 68 07 000 n O 0 1. 1 1. ~ 68 07 00o O0 o I 1. 1 4 6~ 07 000 00 0 1. 1 1 4 68 o 7 000 00 0 1. 1 i ,! 68 07 000 00 t'} 1 1 i ,t 68 07 000 0 () (.) I 1 1 4 68 07 000 o 0 0 1, I !. 4 6 H 07 000 O0 0 1, ! 1 4 68 07 000 o 0 o ! 1 I 4 68 0oo000000o 00()0000000 00()0000000 0000000000 0000000000 0000000000 O 0000 (,) O000 0000()00000 0000000000 00000000(,0 0000000000 00 (',) 0000000 O0000ot) o00 0000000000 0000000000 0000000000 0000000000 00OO000000 0000000000 0000000000 0000000000 O00OO00000 0000000000 0000000000 00000o0000 0000000000 O0000oO000 000000()000 0000000000 0000000000 0000000000 0000000000 0000000000 00 (.) 0000000 0000000000 0000000000 0000000000 0 (,) 00000 0 () 0 0000000000 O0(~000O000 0000000000 I) () () 00 f) 0000 00000()0000 0000000000 00o0000000 0000000000 0000000000 O0OO00000O O()oOOO0000 I I, IS Tape Verification [,istina "0 Schlumberoer ^].asKa Computin~ Center 6-AU(;-1991 I~:26 #m~mm ~ mmmmmmm mm m mm~mmmm m~mm~mmmmmmmm mmmmm~mmm~m~mm~mm~m~m m m mm~mmmmmmmm mmmmmmmmm~m mm m mmmmm m mm~mmm C~CX D~'rE r~/H 0 O0 O0 0 I 1 6R .0- 0000 IIe~~ hI~E ~,I~I~ 07 000 O0 O 1 1 ~ 4 68 0000000000 07 000 oo 0 J 1 1 4 68 07 000 00 0 1 1 1 4 68 07 000 O0 0 1 1 1 4 68 07 1.1, 0 46 0 I 1. 1 4 68 07 1 i 0 44 0 1 1 ! 4 68 07 000 00 0 1 1, .1. 4 68 07 000 00 0 1 J 1 4 68 07 1. tO 46 0 1' 1 1 4 68 07 ll0 44 0 .~ 1 ~ 4 68 07 210 01, 0 J 1 ! 4 69 07 210 01 O 1 1 1 4. ~ B 07 0 C)(.) 00 0 1 1 1 4 6 H 07 000 O0 0 I I ! 4 68 07 000 00 0 ~ 1 1 4 68 () 7 000 00 0 1 !. 1 4 68 07 0 O 0 00 0 I 1 1 4 68 07 000 O0 0 1 1 1. 4 68 07 ¢) o 0 00 0 1 1 1 4 68 07 000 O0 0 1 I ~1 4 68 07 000 00 n 1 1. 1 4 68 07 000 00 0 1 1 1 4 68 07 000 O0 0 I I .! 4. 68 07 000 O0 0 I 1 1 4 68 O 7 000 00 0 1 1 1 4 68 07 000 O0 0 1 I , I 4 68 07 000 00 ¢) 1 1 1 4 68 () 7 000 () 0 0 1 1 :t 4 68 07 000 00 0 I 1 ~ 4 68 07 J. 2. 0 46 0 1. 1 1, 4 6 t~ 07 120 44 0 1 1 1. 4 68 07 120 46 0 !. ~ I 4 68 ()7 120 44 0 1 1. 1 4 6~ 07 222 01 0 1 1 1 4 68 07 220 O1 0 1 !. 1 4 68 07 000 O0 0 1, 1 I 4 68 o 7 o 00 00 0 1 I ! 4 68 07 000 O0 0 1 1. 1 4, 68 07 () 00 00 0 !, 1 1. 4, 68 07 000 O0 0 1 1. 1 n 68 07 000 O0 0 I 1 1 4 68 07 000 O0 0 1 I 1. 4 68 07 00o O0 0 .1, 1 1. 4 68 07 000 O0 0 1 I 1. 4 68 07 000 00 0 1 1 1 4 68 07 010 01 0 1 J ,! 4 68 (.)7 010 O1 0 1 1 1 4 68 07 000 00 0 i 1 1. 4 6 B 07 00 t) 00 0 1 1 1 4 68 07 000 00 0 !, 1 ! 4 6 H 0000000000 0000000000 0000000000 0000000000 0000000000 O0OO00000o 000o000000 0000000000 0090000000 00o0000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0 (,) 00000000 0000000000 0000000000 0000000000 0000000000 (') 0 (,~ 0000000 0000000000 0000000(~00 0000000000 0000000000 0000000000 0000000000 0000000000 00 () 0000000 0000000000 0000000000 000O000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 000000 () 000 PAGE: 20 [,IS Tane VerJ, f]cati, on l,istlnq I' Schlumberqer Alaska ComputJnq Center 6-AU(;-1991 1fl:26 PAGE: 2,1 1 n 0 R h E R # [, 0 RSFV DITE ~,~V II II III III III III G TYPE C[.~ASS MOD NUM[½ ~qANP --'6 ;,.', oo ; 0 1 ,'1 o I 0 1 ! 1 olO O1 0 ~ 1 1 000 n 0 o 1 1 1 000 00 0 1 1 000 00 0 I I 1 0 O 0 00 0 1 000 00 0 1 I 1. 000 O0 0 1 1 1 000 O0 0 1 1 1 800 01 0 8q0 41 0 ~ 1 1, 520 80 0 1 2~0 04 0 1 I 1 282 01 0 2~2 O1 0 1 1 1 2~2 O1 0 0 o 0 00 0 1 1 000 0 o 0 1. 1 1 636 21 0 1 3 1. 522 a3 0 ! 3 1 522 g3 0 1 3 1, 522 ~3 0 1 3 1 522 83 o 4 68 0000000000 4 68 0000020000 4 68 0000020000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 73 Ot) O0000000 2 79 0000000000 2 79 0 (') 00000000 2 79 0000000000 4 68 0000000000 4 68 000000()000 4 68 0()00000000 4 68 O000OO0000 4 68 OHO0000000 ~ 68 0000000000 ,t 68 0000000000 4 68 0000O00000 4 68 0000000000 4 68 0000000000 1.2 68 0000000000 12 68 0000000000 1. 2 68 0000000000 I 2 68 0000000000 1.7 6~ 00oo000000 DATA DEPTH = 132'14 TT~F.DITF: 0. 000 CVEI..DITE -30.31 ITT. O I '..,'E D (") F. p 1 T [,: 0.00 O FTVZ.Di'T'E 0.0!0 RXPO. DICPE o. 054 IDSD. PI TE ~. 2n7 2IX~ . D1TE 2. 5VS. DI'FE 4. 624 CTEM. CDCX. I')ITE -32. 790 CObX. D1Ta -32.227 IX~'. lalTE 29. 960 C!t.~. DITE 436. 472 CII,u. DITE 436. 903 IRI)~.DITE 177q.236 R'I~. ~ITE 336. 065 .50() FEET RS. DITE 8. 500 T E ~' ,'5. f.', l' 'rE 2075.000 !~,APK. [> 1 TM 72. 000 l ~(:, F. o T',rE 0. ooo D!HV. DI TE 243.1 96 PPSt). OIT[; 1.831 ! R~A. DI TE O. Ol 5 VODC. DTTF: 4.619 1,. 5VT. OI'l'~: 4. 648 Hr. D]~TE 245. 940 r..'l'r E ~i, DI TF I 56, ~ 49 I IRD. D].TF7 365. 933 CHCR.DITE 413.748 C~4LR. DITE 414.193 DCID. D!TF O. 000 CSFA. DI'TE 401. 970 I KDH. D1TE 1785. 967 R IX[). DI TE 3. 754 0.000 CS.DITE -0.957 ETI~.DITE ().723 XFOC.DITE O. ooo FTVP.DITE 22q.287 RRFO.DITE 2. ~ 97 XPSD. DI'.rE 2. 102 IRDA.DITE 2.031 IWF2.[)ITE 2.339 S2IV.DITE 1.47.424 R/TE.DITE 156.~49 CDCR.DITE 70. 520 CDb~.DITE 91 .209 IIR~.DITE 99.356 CIDP.DITE 0.000 CILD.DITE 401.970 DCSF.DITE 1776.~03 1XDP.[)ITE -9.888 iXDZ.DITE 1.818.641 0,000 0,023 3,774 0.430 1.831 0,020 2.031 0.020 140.9~4 ]52.643 345,31,6 404.465 450.8]8 451'425 0.000 228.106 -9.888 t. IS Tan. e Yerif. ication Schlumberqer AJ. asKa Co,,putinq Center I m,~.~. D1TE 3231.3.~3 'I X ~, ~.;. [) I q"E RTR~'~. DImE 389.4.82 P !XM. gt TE 1PP~. D] T~j 2.2 ~ B l HPH. L~I'~F' SFLA.D1T~7 , 2.488 SF[II.DITF SFC.I)[TE ~.939 SFCD.DITE ~ J.,693 RSFC.DITE SP, D].T~q -20.000 SFVP. DIT~ 305.40 ~ RSFV. DITE RSPa.DImE 0.375 gPPP.DIT~ DETS. DIT[{ 0 DECb. D]TE SPH T. D ITl.~] 26.38(; SVEL.[)ITK AFCD. DITE 0. 000 AriS. DITF TT4. D!'rE -999.250 TT1 .~ITF DEPTH = 12644,500 FEET TI~,tF,. DITE -999.250 BS,DITF C V E !.,. D I ~' E - 999.250 '~' l T T. () I T E - 999.25 (.> I D O ~. D I T E - 999.25 () T F'TVZ, DITg -999. 250 D RXFO.DITE -999.25{) RPSD. DIT~: IPSP. DIT5 -909. 250 f 21XP.DITE -999.25r ~tOOC. DI, TF I. NDD' PI'r . -999.2~0 15VT.I)ITE 15VS.DiTE -999.250 }~V.DITE CTEM.DITE -999.250 CDCW.DITE -999.250 C1)JjW {)'.[C~,., -909 250 C~'~CR.I)I'FE IIX~.DITE -999.250 CT~D.DIF..' K -999.250 I..CID,DITE)" , Clbu DIT{~: -999 250 CSF~ D.[[ ... IRDN.r~'I~E -9o9.250 IXDH .... DT' 'rF,. RIRD.DITE -999.250 PIXD.DITE I~M~, D.ITE -999,250 IXMN.DTt. RIRu. D.I'~E -999. 250 R Ipp~t DIr~. 999 250 S~[., &. DI'~'E -999.250 SFLU.DITE SFCP.DImE -9. g9.25() RSVC. DJ',I'E SP,DIT~: -999,250 SPAR, [)J'TE . . o F V. r) I RSPA, bITE -9~q, 250 ET ""~ D S. D i ~ E 0 D SPHI.Di'i'E -9o9.. ,250 ..... 8V~.:b. DITE AFCD. [').TTE -999,250 ARS, DI'.I'E PGR.DITE -999.250 GR,DITE TT4.DITE ' 294:'000 TTI.I,')ITE 6-AIJG-199~ 18:26 3183.616 I RMP. [.:II'g 141.019 IRYZ.DITE 2.291 II, D. DITw, 2.488 ~IRES. DJiTE 562.43l RSFB.DITE 8. 692 SFCZ. DITE -20.000 SPD.DITE I 1.~54 SFVZ.DITK 946.162 RSPD. I') I'.~E 2 DECS.DITE 0319.916 DT. DITE 0. 394 lilY. DITE ~ 05. J. 02 6A. DITE -999.250 TT2.DITE 'q99.250 2 II'{P, D:ITE 99.250 ITIqM, D I'I'E -999.250 AHTE.DITF -999.250 IIXD.D/TE -999. 250 C~CX. PI'rE -999. 250 C~I,X. DT'rE -999 250 DCIN.D -999: 256 cst t,,. o ~ ~,' ~; -ggg 250 '999:250 IRDZ.DITE -999. 250 IR~P. DITE -999. ~50 ~RPZ. DITF '999. 250 IhD. D!TE -999,250 MRE8, D!T~7 .99q.25o SFCZ.DITE -099.~50 SPD.DITE -999.~50 SFVZ.DITE -099.250 RSPD, I.) ITE (,) D E C S, D -999. 250 DT. DI'I'E -99g.250 ZHV'DITE -g9~.250 : 6A.DITE 426. 000 TT2. DITE 3226.979 2.21..5 0.150 29.202 -0.07't 559.00O 0.769 514.859 6144. 96,000 0. oo0 -g99. ~50 -999. 250 -999.250 -999.250 -999. 250 -q9g. 25O -099.250 -999.25(.) -999. ~50 -999. 250 -999.250 -999.~50 -099.25o -999. 250 -999. 250 -99.o.250 -999. 250 -¢)99. 250 -999.2,50 -999.250 -999.250 -999. 250 -999.750 -999. ~.50 -999.~50 -999.~50 -999. -999. 250 0 -999.250 -999.250 352.5O0 2~9.200 CS .DITE ETIM.DITE XFOC .PITt FTVP.DITE RRFO.DITE XPSD.D1TE I'RDA.DITE IWF2.DITE $2IV.DITE RITE .DITE CDCR.DITE CDLR.DITE IIR~.DITE CIDP.DITE CIbD.DITE DCSF.DITE I ×I.)P. DITE IXDZ.DITE I X~.P. DITE I×HZ.DITE IL~.DITE SFB. l) tTI~: SFBZ,DITE SFU'.DITE SPDF". BITE RSP. DITE SPDZ.DITE Dw. RS.DITE AREA. DITE ICV.DITE TT3. DITE PAGE: 22 517,455 -16.671 2.289 28.124 1,006 10,441 -20,009 595,250 -31.849 252 0.000 0.000 -999°250 -999,250 -999,250 -999,250 -999,250 -999 250 -999~250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 -999.~50 -999.250 -999.250 -999 250 -999:250 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 0 -999.250 -999.250 426.000 [,IS Tape VerJ£icetJon [.,ist~nq .. ~ Schlumberqer Alaska Computlno Center 6-AUG-1991 18:26 **** FI [.,E TRail,ER FILE [,iAME : O.[Tt;; .013 S~VlCE ': SPLICE VERSION : 4~0-166 DaTE : 9119at05 FILW TYPE : l')[ .... LAST FILE SERVICE F3A~] : FDI. TE [)ATF : ql/O~t/05 TapF NAMf] : DEFA[]LT PP~V IOIJS TAPE CO~.~ENT : P~OC[<SSP;D BY S(~HLU~BERGER DLIS TO [,IS CO~vE~r.,R. ' F UTIL~'I'Y.. ,O **** REF:L q'~A!LEP **** SERVICE ti&NE : DImE DI~T~ ~ ql/08/05 REEl, ~.~A~'~E : DEFA~ILT CONTINUaT!(]~4 ~ : 1 PPEVIOUS REEb CO~ENT : PROCESSED BY SCHLU~BERGER DJ, IS TO LIS CGFIVERTER I~TIL1TY **** REEl, I~EA[)ER **** SERVICE [..)ATE OPlCIN : D I'.~ ! $ RFET, FIA~4E : DEFAUI,,T CO,~EMT : PROCESSED BY SCH[,~;~BERGER DLIS TO LIS CONVERTER UTIbITY **** TAPE HEADER SERVICF. NA,ME : DATF :. 91109/05 OPlCI~ : DL!S TAPF NA~E : CONTINUATIUN ~ : 1 PREVIOUS TAPE COMMENT : PROCESSED ~;Y SCHLUMbErGER DLIS TO LIS CONVERTER UTIblTY PAGE: 23¸ I LIS Tane verifiicatl, on Listinq Schlumberqer Alaska ComouttDa Center 6-AU(;-1991 18:72.6 I FTLE t,~a~k: : GPIT .018 SERVICE ,1 JOB y ~R S l.[']~l .1 480-169 PaT~" ~ 91108/05 FII.,~ TYPE : Db LAST F[I,E : I I I O I ** DATA Ft.lR~AT SPECIFICA:I.'IO5) RECORD ** I ~a .. SE V NIT $... CE A ' aPI AP . I NUI~B . ROCESS ID ORDER ~ LnG TYP~ C[.,ASS MOD MUMB SA~.~P E~L~]~,i CODE (HEY) TIME (;PIT F C D C~ P ! T R[.,A GPIT RSA GPIT k,~ GP[T Sa (;PIT RCA~, GPIT CALl GPI'r CS CPTT CvE~, TENS GP!T H'F E ~.' (;PIT 76 636 21 0 1.8 1 1 4 6a 76 282 01 0 !.8 1 1 4 68 76 ?0.'2 ()1 0 18 I 1 4 68 76 2 ~t o 0 ~ (') 18 1. 1 4 08 76 ~ 80 01 0 18 1 :! 4, 68 76 280 01 0 18 1 I ~ 68 76 280 01 0 18 I I 4 68 76 ~80 01 0 18 1 I 4 68 76 2 ~ 0 01 0 1 a 1 1 4 68 76 2 f~ 0 01 0 I 8 ! 1 4 6 a 76 636 21 0 18 1 1 4 68 76 636 O0 0 la 1 :!. 4 68 76 635 21 0 18 ~ 1 4 68 76 000 00 0 I 8 1 1 4 6 ~ 0000000000 0000000000 0000000000 0000 ¢") 00000 0O00020000 0 () () 0020000 0000000000 0000000000 0()00000000 0000000000 0000000000 0000000000 0000000000 0000000000 PAGE~ 24 i I,I$ Tape Verification I,i, stino I "$chlumberqer Alaska Comput!.no Center- [)AGE 25 ID {3RDER # l,(1¢3 TYPE CLASS MOD ~[.!>4B SAF,'{P EbE[t CODE (HEX) ETYN GPIT S M~R}< GPIT F AREA .C, PIT FT2 AFCD CPIT AR8 ~PIT IHV GPIT F3 ICV ANO~ CF)IT F/S2 FNOP GPIT DER FINC (;PIT DEG HAZI GP.[T DEG P1AZ CPIT DEG Pg GPIT PEG SDEV dPlT DEG TPR~ CPIT ~V GPTm V PHN~ B r) o C DALP GPIT PFF ~1) fT LSHV GPI'.l' V 5SHv CP.'fT V FFSS GP TA[,P (;PIT ~TNP CPTT G n',l' <;PIT DE(;F GMT (;PIT DEGF CTE~ GP!T DEGF MI'E~ GP[T DEGI? A~'CE GP!T CGR CP'[T (;APl SGR GPIT G~PI RSGR (;P~T GAP'[ THOR GPTT ppb{ URA~ GPTT WI},}~ GPTT CPS W3NG GP!T CPS W4NG GP!T CPS WSNG GPTT CPS RLL GPt'T CPS R[.,U GP!T CP~ RLS fi:PIT CPS RI, ST GPIT RSS1 (;PIU' CPS 76 636 21. 0 l.B I 1 4 6~ 0000000000 76 1.50 01 O 1'8 1 1 4 6.R 0000000000 76 28 o (.)4 0 18 1. 1 4 6~ 0000000000 76 ?~2 01 0 1~ 1. 1 4 6~. O0000000oO 76 28? 0.~ 0 1 ~ 1 I 4 68 0000000000 76 2H?, 01 0 18 I l, 4. 6.R 0000000000 76 2R? O1 0 1 ~J 1, 1 4. 6f~ 0000000000 76 631 01. 0 18 1 I 4 68 00000000,00 76 63!. 01, 0 lg 1 1 4: 68 {}000000000 76 631 O1 0 18 76 630 01 0 18 ~ 1 4 6~ 00OOO00000 76 630 01 0 1R ~ t 4 68 00()O000000 76 63tl O1 0 1,~ I 1 4 6~ 0~)0000¢)000 76 620 0 ! 0 1 ~ ! I 4 68 0000000000 76 719 50 (." 18 1 1 4 68 0000000000 7 ~ 000 00 O I ~ ! 1 4 fib n()n0000000 76 000 (.)0 O I 8 1. l, 4 68 0000000000 76 000 00 0 18 1, ~ a 6~ 0000000000 76 000 0 n 0 1 ~ 1 !. 4 6 ~.~ 0 ;) 00000000 7 fi 890 01 0 1. ~ 1 1 4 6fi OOO(.)O00000 7 ~; 0 ~i 0 00 0 18 ! 3. 4 6 ~ 0 () 00 (} 00000 76 3!36 ol 0 18 ~ 1 a, 6H 0000000000 76 358 O1 0 iR. 1 ! 4 68 000000oO00 76 354 O1 0 19 I I 4 6R 0(30',)00¢)000 76 354 00 0 18 1 1 4 6R 0000020000 76 354 O0 0 1 R 1 I 4. 68 000002.0000 76 354 O0 0 18 1 1 4 68 ()000000000 7fi 35/4. 00 0 18 1 1 4 6~{ 0o00020o00 76 000 ()0 0 1. 8 1 I 4 6 fi 0000000000 76 0fl0 O0 0 18 I 1 4 68 0000000000 76 000 O0 0 18 I ! 4 6~ 00000O0000 76 000 00 0 ] H 1 I 4 6~ 0()00000000 76 OOO O0 0 1 ~q 1, I 4 6~ 0000000000 76 000 00 0 IR ! 1 4 68 0000000000 76 000 00 U 18 I I 4 6 .~ 0080000000 7fi 000 O0 (} 1 .~ 1 1 4 6B 0000000000 76 3 !. 0 01 0 1 ~ 1 1 4 68 0000000000 76 3!0 O1 o 18 1 1 4 68 0000000000 76 310 OI 0 18 1 !. 4 68 0000000000 76 790 50 0 1~ 1 l 4 68 0000000000 76 79~ 50 0 lB 1 1 4 68 0000000000 76 310 02 0 1.~ J 1 4 fib 0000020000 76 310 02 0 1 ~ 1 1 4 6~ 0000020000 7~ 310 02 0 1 ~ 1 1 4 6~ 000002()000 76 310 02 0 18 1 1 4 6~ 0000020000 76 31o 02 0 18 I, 1 4 6B 000002{)000 76 354 O? 0 1 ~, I I 4 6~ 00O0020000 76 354 0 ~. 0 1 ~ .~ I 4 6 P 000 (.) 020000 76 354 02 0 1,8 1 1 4 6~, 0000020000 76 354 02 0 J. 8 1 I 4 68 0000070000 76 354 O1 O 18 ~ 1 4 6~ 0000020000 [,IS Tape Verlficatlon bistl, nq SchlumberQer Alaska Compt]timc] Center 6-AUG-1991 18:2.6 PAGE: 26 mm ~ mmm~mmm m m~m~ mm mmm~mmmm m mmmmmmmm ~ mm~m mmm .............................................. mmm m m mmmm mmm mmm mmmmmmmmmm~m RS Tg' CPS 76 354 O1 0 18 1 I 4 68 0000020000 L[, GPTT CPS bi.! C, PIT (.'PS L$ C, PTT CPS [,ITH ¢;PTT CPS SS1 GPTT CPS SS2 (;PIT CPS RGCN f,'P.T.T CPS RCNT GPI"I.' CPS RCFT C,P].T CPS CNTC GP'tT CFTC ~PY"I.' CPS SPCD CP!T 1~ R [..-:,q GPIT DPHI GPTT TNpH cpl'r pu NPHT GP!T l::,l,,l NDL (i P'I' ']' DRHO (.lPlT (.';/C3 LSR~'; GP'[T G/C3 LUR.~ (;PIT (.i/C3 QRL$ OP..r,'t' GIC3 0 I..,$ C, P'r T G/C3 OSS GPTT G/C3 RUOB GPIT G/C3 SIR" GPIT C,/C3 NRHf~ GPIT G/C3 S C N 1.., GPTT NPOR GPIT PU 1. h GPIT RMI CPl'T RMN G P T'.r [)R M t'4 MTNV GPI'I.' OH~IM MNUR C:,PIT O~ GPIT H8 AX OPI'r FtS2 AY GP!T F'/S2 GPIT F/$2 FX CPTT fiE[{ FY GP'[T 76 354 O1 0 18 1 76 354 o1 0 18 1 76 3!54 Ol 0 I 8 .1.. 76 354. 0.1. 0 18 1 76 354 02 0 18 1 76 354 02 0 1R 1 7~ 000 O0 0 1 ~ 1 76 0 () 0 00 0 I 8 1 76 000 O0 0 76 000 00 0 76 0o0 O0 O 18 1 76 280 00 0 18 1 78 0 () 0 00 0 1 g 1 76 89,.0 O1 0 18 1. 76 000 00 0 18 76 0 O 0 00 0 18 1 76 000 O0 0 76 356 01 0 18 1 76 350 02 0 1~ 1 76 350 02 0 18 1 76 354 76 354 O1 0 ltq 1 76 354 0! 0 1.8 ! 76 350 02 0 1~ 1 76 350 02 0 18 1 76 350 Ol 0 18 1 76 000 O0 0 l.g l 76 000 O0 0 18 1 76 636 21 0 18 3 76 2..50 O! O 18 3 76 250 02 0 I 8 3 76 250 01, 0 18 3 76 250 o 2 0 I. 8 3 76 636 2~ 0 18 4 76 61.5 02 0 18 4 76 615 03 0 In 4 76 61.5 O] 0 18 4 76 000 00 0 18 4 1 4 I 4 t 4 1 4 t 4 l 4 1 4 1 4. 1 4 I 4 1. 4 1 4 1 4 1 4 1 4 1 4 ! 4 1 4 '1. 4 1 4 ! 4 ! l 1 4 1 1 1 J 1 1 1. I. 1 68 0000000000 00000()0000 68 oO00OO0000 0o00000000 68 0OO0000000 68 0o0000o000 68 ()000000000 0000000000 68. 0oo0000000 68 00o0000000 68 0o0o00o000 79 0000020000 6R 00000()0000 68 0000000000 68 0000000000 0000000000 0000000000 68 0000000000 0000000000 68 0000000000 0000000000 0000000000 68 0000000000 68 00000On000 68 00o0000000 6g 0000000000 79 0000000000 0000000000 1.2 68 12 68 1.2 68 1,2 68 1.2 68 1.6 6~ ,1, 6 68 16 6R 16 68 16 6~ 0000000000 0000020000 0000020000 O00000nO00 O(',n()O00000 0o00000000 0()0000o000 0000000000 0000000000 0000000000 ** DATA ** ** DEPTH : 13'!.78,000 FEET I, IS Tape verification I,ist. Inq ~) Schlumherqer Alaska Comp,)t.lno Center ' '"W T!ME.C-PI'r 0.000 i RLA. GP T'!' 0.000 RSA. GD/T ~,.' RCAI.,. ~P~ T 0.000 C~!,I .GPlT ,,:;~ TE~IS. (;PIT 3405.000 ~{'rEt~. GpI T : A~g~.GP!T 0.065- ~ ICV.GPlT -0.10I Ai~Oa. (;PIT H~ZI.~P!T 6~. 14'3 Pl~Z.GPlT POT~.GPIT 0,073 TPRA.GPIT }iV GPIT 245 940 PI'~MD ~ PE':F.GPIT 5.47~ ORSS.GPI:T SSHV.GPIT 1326.49& FFSS.GPIT TNR A. GPIT 3,3 3 ~ (; lT. ~PlT MTE~.GPIT 163.540 ~P'I'E. GPlT ~ RS(;~.~PIT 94. 126 'FaOR.GPIT W2NG.GP!T 150. 376 ~ 1,1.. flPlT 1 ~ 3. 005 R[,U. (;PIT R~S1 .GPIT 251.152 RSS2.GPlT ~ LS.GPIT 330,O77 l.,, [TH. GPl T RGCN.GPIT 1653.5~0 CFTC.CPI'T 503.541 SPCD.GPlT T~p~.(;PIT 39,30,4 ~lP~4I.(;P.IT ~ bSRW.GPIT 2.295 UURH.dt?IT OS~. GPI T 0. 077 SCNI,. GPI T 0 ~PUR. GPIT RNN.GPIT -999.250 MtNV.GP!T O AX.GP.rT -909.250 ~Y.GPIT FY.GPtT -999.250 FZ.GPIT ** DEPT}t = 1.2689.000 F O TIMR.GPIT -999.25(:! PI, A.GPTT -999.250 RSA.GPlT RCAL.GP!T -9o9, '?,5i~ fiA[,I.GPIT ~ TENS.GPIT -999.750 APEA .(:PIT -909.25o AFCD.GPIT ICV. ('.P[T -999. 250 A~OR.GPIT },IAZT ,CPIT -999.250 PI, AZ.GPlT ~ POq'~. GP]'T -999.250 TPRA.CP.[T HV.GPIT -999.250 PHN[). GP !'F PE~ GPIT -999 ~50 OReo., ...... ~, Sc CPtT SSHV.GPIT -999,250 FFSS,.GPIT ~ T~IRg .GPlT -9~9,250 (;A'.P, GP I T RSGP.f;P!T -999.250 Ti'fOR. GPiT W~NC. GPI']' -909.250 W3MG.GPlT ~ ~1.,[.. G['~ I T -909.250 RSSI.CPIT -999.250 R.SS2.GPIT I~S.(;PIT -999.P5() I,.l TH. CPJ, T RGCN.GPIT -999.250 RCNT.GPiT ~ CFTC.GPlT -999.~50 SFCD.GPlT TNPH.GPIT -999.25U NPFII .(;PIT [.,SR~. GPI T -999.250 [,[~PH.GP!T OSS. GPI'I' -999.259 ~ SCNI,.CP!T [) ~,lP(3R. GP IT R N ~,~. O P I T 0.0 a 0 ~.,I 1 N V. (; P .[ T gET ~ o 3. 2. 352,. 0. 32, 402. O. 0. '0. 131 . 163. 9. 60. 294. 32a' 170~. 46. 2. ?. 39. -999. -999. -g99 o -999. -999. -999. -999. -999. -999. -999. -099. -999. -099. -999. -999. -999. -099. -999. -999. -999. -999. -999. -999. -999. -999. -q99, 0. 6-AUG-1991 18:76 500 F'CD,GPIT 7.000 ~40 !..,A.GPIT 4.366 713 CS.GP[T 850.R63 902 ETI~,GPIT 0.000 267 ABS.GPIT 0.394 132 Fi,IOR.GPI~T 0 637 975 RB.(;PIT ,1,4a:752 524 TI.JR~,GPlT 1.8.366 114 BDOC.GPlT 767 I,SHV.GPlT 1,439.034 060 TALP 329 (';~'r, G["[T 166.484 540 CGR.GPIT 70.990 183 IlRAN.GPlT 0.500 1.50 W4~IG.GPlT 0.000 04~ RI.,S.GPI. T 330.027 859 Lh. GPr'r 183.006 912 SS1.GP,IT 251.152 964 RCFT.GPIT 483.436 0 MRES.GP,£~ 0.1,46 887 NPL.GDIT 40.440 351, ORLS.GPIT 0.740 462 S1RH.GPIT 1.9'76 304 1A.GPIT -999.750 250 MtlO~.GPIT -099.~50 250 AZ.GPlT -999.250 250 250 FCD.GP[T -999.250 250 LA.GPIT -999.250 250 CS.(;PlT -999.250 ?50 ETIM.(jPlT -999.250 250 ABS.GPIT -999.25o 250 FIqOR.GPlm -999,250 250 RB.GPlT -990.750 ~50 TIIRA,(;PIT -999.250 250 BDOC.GPIT -999.250 250 bSHV.GPIT -999.25{) 25([) TAI, P.GPIT -999.250 250 GNT.GI"IT -999.250 250 CGR.GPIT -999.250 250 [,IRA~4.GDIT -999.250 ~St} W4NG.GPIT -999.250 25o R[,,$.GPIT -999.950 ~50 [,L.GP!T -999.P50 250 SS1.GPlT -999.250 250 RCFT.GPIT -999.250 0 ~RES.GPIT -999.250 250 MP[,.GPIT -999.250 250 ORI,,$.GP!T ~50 S1RH.GPlT -~99.250 250 ~ A.GPI~ 672.50o 000 MNOR.GPIT 0.0()0 }tDIA.GPIT SA.GPlT CVEL.GPIT IHV .GPIT FINC.(;PI, T SDEV. GPI'r [IPRA.GPIT DALP.GPlT FFLS.GP!T RTNR.GPIT CTE~.GPlT SGR.CPIT W1NG.GPIT WSNG.GPIT RblT.GPlT I.,U.GPIT SSP.GPIT CNTC.GPIT DPHI.GPIT DR[JO.GPIT OLS.GPIT NRMO,GPIT R~I .GPIT 2A.GPIT FY. (;PIT HD.[ A. GPIT 5A.GPlT CvEL. GPIT ~ARK.GPIT IHV.GPIT F! NC. C,P !'I' SDEV.(;P! T LIPR~. GPIT DA[lP.GPIT FFLS.GPIT RTNR. GPI T CTE~.GPIT SGR.GPIT W1NG.GPIT wSNG.GPIT RI.,I.T. GPIT ][,, II. GP I T SS2.GPIT C~TC.GPlT 5PHI .GPIT DRHO.GPIT Q[,,S.GPlT NRHf,.~. GPIT R~II .GPIT 2A .GPIT PAGE: 4.754 0.388 -14.1.~1 68.000 O. 032 80.230 21.812 21.916 0.497 -0.066 3.500 1,52.600 94.561 285.714 1,5.038 69.912 294.043 324.859 1653.580 11,377 0.167 0.080 2.462 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999.250 -999,250 -999,250 -999,250 -999,250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 -999,250 -999.250 -999.250 0.000 -999.250 27 [,IS ~'ame Verj.[ication [0Jst].nq · Schlumberoer A.laska Computinq Center 6-ALIG-1991 18:26 A×.GPIT -999.251) AY.¢;PlT -990 250 AZ.GPIT 0 FV,(;PIT -9q9.~50 F'Z. (;PIT -99q~250 -999.250 ** EN~ O? DATA ** **** F I bF., TRAILER FTbE NAME : GPIT .0 SERVICE : ,JO. VFRSION : 4B0-160 DATE : 91/08/05 MAX REC SIZE : 2192' FI [,E TYPE : LAST FILE **** TAPE TRA II, ER **** SERVICE N A ~ P7 : DATE : OR IC,'[N : TAP~: NAIF: : OEFAUI, T CON~'INUA'TION ~ : 1 PREVIOUS TAPE : COt~,~ENT : PROCE,.S~,[) BY SCtlbIJ~[3~fRGkfR DLIS TO LIS CONVER%ER UTI[,.[TY ,e ,o **** TAPE HEADER **** SP~RVI'CE ~;A~iE : FGPlT DATF : 91/08/05 ORI~IM : DL!S TApF NA~f : DF, FAULT CONq'iN~.IATIOM ~, : 1, PREVIOUS TAPE : COM~IEDJT : PROCESSED [~y SCI..~[,UMBERGER ObIS TO LIS CONVERTER IITI'[,].'TY **** FILE HEADF:R **** FILE NAME : GPIT .01.0 SERVICE : dOB VERSION : 4.,BO- 169 DATE : 91/0~/05 ~AX [iRC SIZE : 8192 FIBE TYPE ~ DJ,, I,~ST rlbE : FX.GPIT PAGE: -999.250 bis Tape VerlfJ. cation l..,J, stlnq Schlumherqer AlaSKa Comput. inq Center 6-AUG-1991 18:26 DATA FOR~IAT SPECIFICATIUN RECORD ** SET TYPE - 64EB ** TYPE REPR CODE VAbtJE 1 66 2 66 0 3 79 544 4 66 1. 6 73 0 7 65 IN 8 73 6O 11, 66 1,5 12 68 -999, 13 86 15 66 73 16 66 0 66 TIME GPTT BS GP[T IN F C D tIDIA GPIT Itt RI,A GPIT I~ RSA GPTT t,~ GP!T SA GPIT RCAT., GPI'T I CALl GPTT C S (; p [ 'r F CUE[, TENS (;PIT l, f3F IITE~ GP'[T LnF ET.Iu (;PIT S MARK (JPTT F AREA GPJT FT2 AFCD CPIT Fro2 A~S (;PIT FT2 IPV GPIT F3 ANOR GPlT F/S2 FNOP (;P'TT [) F,' T N C HAZI GPIT DE(; P~aZ CPTT DEG 76 636 21 0 19 I ~ 4 6~ 0(}00000000 76 282 O1 0 lo 1 1 4 68 O000OO0000 76 282 O1 0 lq 1 i 4 b8 OOO0000000 76 280 O1 0 19 1 1 4: 68 0000000000 76 280 (.)1 0 1,9 I 1 ,,3, 68 000002,0000 76 PUn O~ 0 lO ! 1 4 68 0000020000 76 280 0! 0 19 1 1 4 68 0()00000000 78 2f3() 01. 0 19 ~ ! 4 6R O000nO0000 76 28O 01 0 lo ~ 1 4 68 0000000000 76 280 O1 0 19 1. 1 4 6?, 0000000000 76 636 21 0 19 !. 1 4 69 ¢')0 O0000(.~00 76 6.36 O0 0 1.9 1. I 4 61t 0000000000 76 635 21. 0 19 1 1. 4 68 0000000000 76 0()0 oo 0 l 9 1. 1 4 68 0000000000 7G 636 21 0 lq 1 1 4 6~ 00000000O0 76 150 01 0 lq !, 1 4 68 0000000000 76 2 ~.,' 0 O 4 0 19 I 1 4 68 () 000000000 76 282 Ol 0 iq 1. 1 4 6§ 0000000000 76 282 O1 0 19 1 1 4 68 0000000000 76 2~2 O1 0 !.9 I 1 4, 6fl 0000000000 76 282 O1 0 19 1 I 4 68 0000000000 76 631 01 0 lq I. 1 4. 68 0000000000 76 631 O1 0 19 1 I 4 6fl 000000o000 76 631 O1 0 lq 1. 1 4 62 0()0()000000 76 630 O1 0 lg 1 1 4 68 000()000000 76 63r) 01 0 I o 1 1 4 68 0000000000 PAGE: 2g Tape Verlflcatlon I,ist..]oo SchlU.mber(ler AlasKa Comuutinq Center 6-AUG-1991 1,8:26 PAGE: 3O PoTh C-.PIT TPRA GPIT TIIRA GPIT UPRA GPTT HV GPIT v pNND GPIT BDOC GPIT [) A L P G P 1 T pFF ~P T'I' O~SS ~PTT LSI!V GPIT V FFLS GPIT SSHV GPIT V FFSS GPTT T~bP RTNP GPTT q'NP~ GPTT GAT GP l']" DEGF GMT (;PIT DEGP CTF.~ ~PTT DEGF MTE~'~ GPIT DEGF AMTE GPIT DEGF CGR GP l'. T GAPI SGR GPlT GAPI RSGR GPI'T GAPI T['tO~ GPIT PPM UPAN GPIT WI[,]C GP!T CPS WgNC GPIT CPS W3NC ~PIT CPS W4. NC GPIT CPS WSN~ ~PIT CPS RLb GP!T CPS RLU GPIT CPS R[,S GPIT CPS RLIT GPIT CPS RSS! GPI'r CpS RSS~ GPIT CPS L[, GPIT CPS bU CPIT CPS LS GP!T CPS LITI~ CPIT CPS SS1 GPIT CPS SS2 CPIT CPS RGCM GPIT CPS RCNT (;PIT CPS RCFT (;PIT CPS CNTC ~PIT CFTC PIT CPS 76 76 76 76 76 76 76 76 7~ 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 76 '?J.q 50 0 000 O0 0 19 000 00 0 1 q 000 O0 0 19 000 O0 0 19 890 01 0 000 00 0 1 q 356 O1 0 19 358 01 0 19 354 01 0 19 3.54 O0 0 19 354, O0 0 19 354, O0 0 1.9 354 00 0 1 g n 00 00 0 19 000 00 0 19 00 (; o 0 0 19 000 o 0 0 I 9 000 00 0 000 00 00 () 00 0 19 000 OO 0 19 31,0 01 0 310 O1 0 19 310 01 0 1.9 790 50 0 .1.0 792 50 0 1.9 310 02 0 1.9 310 o2 0 19 310 02 0 lO 310 02 0 19 310 02 () 19 354 02 354 02 0 l.g 354 02 0 l,g 35/1 02 0 19 354 £)~ 0 19 354 01 0 19 354 0 ! 0 19 354 01 0 19 354 0! 0 19 35~J. O1 0 19 354 02 0 354 02 (') 19 000 00 0 19 000 00 0 1 000 00 0 19 000 O0 0 19 000 00 0 19 I 1 4 68 1 1 4 68 1 1 4 68 1. 1 4 68 ! I a 68 1 1 4. l 1 4 1 1 4 68 1 1 4 68 1 1. 4. 68 1 I 4 68 I 1 4 1. 1, 4 1, I 4 68 1 1 4 68 1. I 4 68 I 1 4 68 1 1 4 68 1 I 4 6P 1. 1. 4 68 1 1 4 6~ I 1. 4 6~ 1 1 ~, 69, I I 4 68 1 I 4 68 1. t 4 68 I 1 4 68 1 1 4 68 I 1, 4. 1, 1 4 68 1 1 a 1 1 4 68 1, 1 4 68 t. 1, 4. 1. 1, 4 6~ 1, 1. 4 68 1, 1. 4 68 1 I 4, 68 ! 1 4 68 1 1 4, 68 !, 1 4 68 1. 1 4 68 ! I 4 68 1 1 4 68 1 I 4 68 1 1. 4 68 1 1. 4 68 t 1 4 '68 O000nO0000 ()¢)0000000() 0000000000 0000000000 0000000000 0000000000 0000000000 0 (.) 00000000 0()00000000 00o0000000 oo00020o00 000002000'0 0000000000 OOO00200O0 0000000000 0000000000 0000000000 0000000000 000()()00000 o000000000 0000000000 0000000000 0000000000 0000000000 0000000000 O000oOOO00 0000000000 0000020000 ()00o020000 '00000200 00 000O020000 00000200O0 o000020000 0000020000 0000020000 0000020000 0000020000 0000020000 0000000000 0000000000 0000000000 0000000000 00000000o0 0000000000 0000000000 0000000000 o00(jO00000 0000000000 0000000000 LIS Tar>e Yeri~l. catlon I..,lstlnq Schl. t]mberqer AlasKa ComDutl. nq Center 6-AUG-1991 18:26 PAGE: 31 SPCD GPIT 76 280 DP}il GPTT TNpH GPlT P[~' 76 000 NPHI (;p!"r p,~ 76 090 ~ NPL <:PIT PU DRHO (;PIT G/C3 76 356 bSRH CPT'I' G/CB 76 35O [,URu GP!T G/C3 76 350 .~ O~hS GP!'.{: G/C3 76 354. OI.,S GP[T G/C3 76 354 OSS GP ] 'i' G/C3 76 354 RHOB GP!T G/C] 76 350 ~ Sl~'" GPlT G/C3 76 350 [,PHD GP!T G/C3 76 350 SCNL GPIT 76 000 NPOP GPIT ~ 1~ CPTT g5 76 636 RMI d P I 'I.' OHM'4 76 R~N CP!T O~M~ 76 250 MTNV GPIT O~IM~ 76 250 ~ ~NOP GPIT OHM~q 76 250 2~ GP I'{' MS 76 636 AX GPIT F/S2 76 615 AY GP!T F/S2 76 615 .~ AZ GPIT F/S~ 76 615 FX GPIT OER 76 000 FY C;PTT []ER 76 000 DATA ** D[.:F']?}4 : 1. 3066.0 T! ME. CPTT O. 000 95. ~ RL~. GP!T o. 00(.} RSA. R C A l.,. G P '[ T 0.960 C A L I. T F N g. C P l T 3660.0 o 0 t~t T F ~'l. APE~, ,GP!T 0.0[~4 ~ 1CV. (;P II' -0.091 ~NOR. HAZI.GPI'T 6! .075 POT3,. GPIT 0.001 TPPA. HV .GPIT 247.11 ¢) PHND. 0 PEF CPIT 3 616 O°n* S~HV.CPI'C I 3~8,~5a 'rNRA. GPTT I. 971 GAT. MTE~~ .(;PIT 162.609 AaTE. .~ RSG~, 6Pl T lq, 23.4 T~ON, W2NG,GPIT 44.776 W3NG. O0 0 19 1 00 () 19 1 01 0 lq O0 0 19 1 0O 0 19 00 0 19 1. 0! 0 19 02 0 19 02 0 19 1. Ol 0 1.9 01 0 19 1 Ol 0 Iq 1 O2 0 19 1 02 0 1 o 1 01. 0 I'9 1 00 O 19 O0 {) 1 O 1 21. O 19 3 0! 0 lq 3 O2 (; 19 3 01 0 19 02 u 19 3 21 0 19 4 02 0 J9 03 0 19 4 01 0 19 4 (')0 0 1 q 00 0 19 4 00 0 19 4 1 2 79 o000020000 1 4 6R 0000000000 1 4 68 0000000o00 1 4 6R 0000000000 1 4 68 0o00000000 1 4 6 ~ 000000009 (,) 1 4, 68 ohO0000000 1 4 6R 0000000000 1 4 6 g 0000 t) 00 (> t~ 0 1 4 6[.~ 0000000000 1 4 6 ~ 0 (') O 0000000 I 4 6~ 0000000000 1 4. 68 O0000000oo I 4 68 0000000000 1 4 68 o000000000 1 2 79 0000000000 1 4 6R 0000000000 !. I 2 fir 0000000000 1 12 68 0000020000 I I 2 6P 0000020000 I 12 68 0000000000 1 12 68 00OO000000 1 16 68 0000000000 1 16 68 0000000000 1 1 6 66 0000000000 1. 16 68 0000000000 I 1, 6 6 [~ 0000000000 I ! 6 6~ 0o00000000 ~ 16 68 00000000()0 00 FEET GPIT 8.500 [;'CD. (]PIT 3. 920 [,,A. GPtT 3.541. CS. (:.. Ia' 557.396 ETIM GP IT O. 267 ABS. GPlT 32.199 FNOR, G['J;T 210. 773 RB. GPJ. T 435.70~ TIJRA. (; ~ I '~ 0. ~ 19 ~ [) 0 C. 6PIT O.719 I,SHV. GPlT -O.035 TALP. GP!T I (,1 .400 GHT. (;PIT 162. 609 CGR. (2P I. T 0.436 I. tR AN, GP!T 0.000 W4NG. GPlT 7. 000 ?tf)IA.GPIT GP.IT 4. 366 SA.GPIT GPIT 824.931 CVEI,.GPIT GPIm 0.000 M^RK.GPIT GPIT 0.394 .IHV.GPIT GPIT 0.635 f'l'NC. GPIT (;PIT 151 .500 SDEV.GPIT GP[T 0.476 LIPRA.GPIT GPIT 0. 000 D~LP.GPIT G°IT 1445.51 l FFI.,S. GPIT GPIT 1 .034 RTNR. GP'.I T GPIT 196.831 CTEM.GPlT (;PIT 2. g54 SGR.(;P!T (;pI'r 0.915 WlN(J.(IPIT GPIT 0.n00 WS[.~G.GPI T 4.825 0.458 -1] 749 68~000 0,042 80.1.23 21,710 914.626 -0,042 -0.013 2.067 175.100 1,9.323 59,701 0.000 LIS Tame Verification I. lstJnu Schlumberoer AlasKa Computinq Center' 6-AUG-19ql 38:26 RLI,.C. PIT 183.835 Rbl].GPIT 307.724 RLS.GPIT 337.697 ~ RS~.GPTT 201.546 PSS2.(;PI? 283.490 bL.GPIT 183.835 .GPIT 337.697 LITH.(;PTT 9~.917 SS~.GPIT 2()~.546 RGCM.GPIT 3699.294 ~C~]T. (;["' l· 3~23.~95 RCF'T.GPIT 1822.37Q CFTC.GPTT 1 898. 1.6(~ SPCD.GPIT 8 ~RES.G~IT 0.146 ~ TNP~ GPIT 1~.~43 NPHI.GPIT 23.175 k~PL. GPlT 19.021 bSRW$CPlT 2.2ql I.,URH. GPIT 2.323 OPLS.GPIT 0.693 OSS.GPTT 0.03i) RHO~.GPlT 2 2~9 S1RH.GPiT 2.~99 SCb!I.,. CP~ T i; ~,,~POR. (;PIT 18~943 1A.GPIT -999.~50 ~ R~N.GPlT -999.,250 ~INV.GPIT -999.~5() I,i~OR. aPI'[' -999.250 AW.CPlT -999.'95~) AY.(;PlT -999.250 AZ.GP.IT -990.250 FY.GP!T -999.25~) FZ.GP],T -999.~b0 ** DEPT}! : 1.2690.5110 FEET TIME.GPlT 2452.000 BS.GPlT RI,n,. ¢;PIT 5. 609 RSA. GP] m RCAI,. ¢IP.T.T 6.9~0 CALl .GPlT TFNS.GPIT 6220,000 HTEN. (';PlT AREA.GPIm 0.418 AFCD.GPlT TCV.GPlT 44.303 ANOR.GPlT HAZT.GPIT 175.853 PlAZ.(;PIT P~TA,.G~IT 0.0~ 2 TPRA.GPIT [tV.GPIT 2~3.600 PIiND.GPiT PEF.GPI'T ~ i{. 159 ORSS.GPIT SSHv.GPtT 1330.551 FFSS.GPIT T~RA .GPTT 3.512 (;~'['. GPlT ~ITEI, i. GP I'!' 158.b56 A~,ITE. GPIT RSGP.GPIT 63.7~ T}IDR.GPIT WgNG.GPIT 94.498 ' W3NG.GPIT RLI... GPIT 6~ .0~ ~ RLU. GPlT RSSi .GPIT 59.69a RSS~.GPIT bS.~PIT 128.~47 LITH.GPIT RGCN.(;PIT 1602.239 RCNT.GPIT CFTC.GPIT 46I~.691 SPCD.GDIT TNPH.GPIT 41.890 MPHI.GPIT 5 S R ~. ~ P ,l T 2.948 b {J !~ H, G P I T OSS.GPIT -0.133 RHOB.GPIT SCNt,.GPIT 0 t. JPOR. GP!T R~M.GPIT 0..000 ~I~aV. GPlT AX. GPTT i. 1,787 l Y. GOIT FY,GPIT 0, 151 FZ.GP!T Et.lt) OF. r)ATA ** 8.500 FCO.GPlT 4. 880 I.,A. GPIT 8.684 CS.GPIT 782.541 ETI~.GPIT 0,267 ABS,(;PT ' 31.540 FN.OR.GPlT 21 R. 57 a 525.211 TLIRA.GPIT 0.36g BDOC.GPIT 0.557 I,SHV.GPIT 0.036 165.725 G~T.GPIT 158.619 CGR.GPIT 6.~05 URAN.GP!T 3~.476 W4NG.GP[T 132,471 RLS.GPlT 0 ~RES,GPIT 43,~.59 NDb,GPIT 2,981 ORLS,GPlT 2.041 S1RI.I,GPlT 41.913 1 A,GP IT 0.0UO MNOR,GPIT 0,924. AZ 0,59~ 7.000 B.833 743.~69 149§.230 0. 394 0.fl44 41.26'1 1, .~06 0.00n 1447.742 0.824 200.937 42.314 3.435 5.1.04 128,247 62.0~2 54.41,6 462. 406 0.1,4.7 37.3.9,1, 0.6.38 4.838 806.000 0.000 29.894 HO1A .GPIT SA.GPIT CVEh.GPIT ~.,~ARK.GBIT I H V. C, P I T FINC.GPIT SDF, V.GPIT LIPRA.GPIT DAbP.GPT. T FFLS. GPI'[' RTNR .GPIT CTE~',. GPI T SGR .GPlT W1NG.GPIT WS~,~G. GPIT RLI T. G PI T [,U.GPIT S82 .(;PIT CNTC.GPIT DPHI.,GPlT DRIll.) GPIT OI.,$'. GPIT NRH0. GPI T R~]'..GPIT 2 A .. GPI T FX.GPIT PAGE: 32 91.917 307.724 283,490 3699.294 21,904 -0,002 0,033 2,289 "999,250 "999.250 "999,250 10.137 1.303 -12.399 70,000 144.786 63.339 18 171 2901'180 -1.975 0.036 3.543 175.100 65.576 210.123 5,104 13.088 132,471 85.404 1588 310 36~879 021 2,041 0.000 1210,000 0,546 t,IS Tape Verff.icatton l,j. stina · $chlUmherqer AlasKa Comput. in¢l Center 6-AUG-19gl 18:26 **** FI/,E '.['R A ! hEP FILE ~.IA,HE : GP!T .0!g SE.RV ICE r. JOB VF}~$ IO1~ : 4BO-169 D~TE : 9110~/05 ~X RFC SIZE ~ ~192 Fll,E TY P ~.i : L~ST F1LE : **** TAPE T[tA I I..,EP **** SERVICE ~'.J h t~ F, : D/~TE : PREVIOUS TaPE : CO~,~Ei'.~T : PP, f)C[~8S~iI') PY SCHI'.,I.I~BENGER DI,,IS 'rD LiS CONVERTF:R I~TI[~ITY 0 **** I:~ F,'. k: 1, "1' R A 1 T, .b.':P D/~ T,.m, : OP I Gl r~' : DLIS RF.E.T, N~M[,] : [)F,F/IUI, T CONTIbtl.}hTTC')N # .' 1 PPEV.I. OIIS P E.:E b : COMME~,I'.[' : PROCESSED BY 5CHI,U~BER(;ER DLJ.$ TO LIS CO~tVEI~TER I.ITI[,,ITY PAGE: REC£1V£D Alaska Oil & Gas Gons. Gommi~sion AnChorage Tape Verification b[sting .-hlumberger Alaska Comput~,ng CeDter 19-AUG-1991 11:31 SERVICE NAME : DATE : 91/08/11 ORIGIN : CSU REEL MANE : 422562** CONTINUATION # : O0 PREVIOUS REEL COMMENT : SCHLUMBERGER WELL SERVICES CSU TAPE **** TAPE HEADER **** SERVICE NAME : PM13 DAT~ : 91/08/11 ORIGIN : CSU T~PM NAME : 4,22562**- CONTINUATION # : O0 PREVIOUS TAPE : CO~ENT : ~.CHhUMBERGER WELL SERVICES CSU TAPE **** FILE HEADER **** FILE NA~E : GCT ,.003 SERVICE ~ LOG VERSION : 32 4 DATE : 91~08/11 MAX REC SIZE : 1,024 FILE TYPE : PR LAST FILE : ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR ~DE VAL~ 1 66 0 2 66 0 3 79 120 4 66 5 66 0 6 73 0 7 65 INCH 8 73 60 9 65 il 66 12 68 13 66 14 65 ~IN ~5 66 0 66 0 Chlumberqer lasKa Comput ng Center PAGE~ ** SET TYPE NAME SERV UNIT SERVICE AP1 API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUmB SA~P ELEM CODE (HEX) TOD GCT S 99 000 O0 0 3 { ! ' 4 73 0200800000 TI~E GCT ~$ 99 636 2~ 0 3 { 1 4 68 0000800000 ETI~ GCT S 99 636 21 0 3 { ~ 4 68 0000800000 CS GCT F/HR 99 636 2~ 0 3 ~ ! 2 49 0200800000 TDEP GCT F 99 636 2~ 0 3 ~ ! 4 68 0000800000 DIFF GCT F 99 636 2~ 0 3 ~ 1 4 68 0000820000 TFN$ GCT bBF 99 635 21 0 3 I 1 4 68 0000800000 ~ARK GCT F 99 150 O1 0 3 1 I 2 49 0000800000 GCSD GCT F/HR 99 000 O0 0 3 ! 1 4 68 0000800000 A~NG GCT DEG 99 000 O0 0 3 1 ~ 4 68 0000820000 AXAM GCT DEG 99 615 O0 0 3 ~ I 4 68 0000820000 AZIM GCT DEG 99 630 1~ 0 3 ~ 1 4 68 0000800000 CDPT GCT F 99 000 O0 0 3 i I 4 68 0000820000 CWEI, GCT D/HF 99 000 O0 0 3 ~ 1 4 68 0000800000 DER2 GCT DEG 99 000 O0 0 3 . ~ I 2 49 0000820000 DEVI GCT DEG 99 620 11 O 3 i I 4 68 0000800000 ED GCT F 99 000 O0 0 3 ~ ! 4 68 0000800000 GDEP GCT F 99 000 00 0 3 1 I 4 68 0000800000 ND GCT F 99 000 O0 0 3 1 ! 4 68 0000800000 R~AN GCT DEG 99 000 O0 0 3 ! 1 4 68 0000820000 R2AN GCT DEG 99 000 00 0 3 ! ! 2 49 0000820000 RAZI GCT DEG 99 630 11 0 3 1 1 4 68 0000820000 RDPT GCT F 99 000 00 0 3 ~ 1 4 68 0000820000 RED GCT F 99 000 O0 0 3 1 ! 4 68 0000820000 RND GCT F 99 000 O0 0 3 ~ 1 4 68 00008~0000 RTYD GCT F 99 000 00 0 3 1 ! 4 68 00008~0000 SROT GCT REV 99 000 O0 0 3 ~ 1 4 68 0000800000 TICK GCT S 99 000 O0 0 3 ~ ! 4 68 0000800000 TVD GCT F 99 960 O~ 0 3 ~ ~ 4 68 0000800000 VSEC GCT F 99 000 O0 0 3 ~ ~ 4 68 0000800000 VSTR GCT F 99 000 O0 0 3 1 1 2 49 0000820000 CTE~ GCT DEGC 99 660 21 0 ~ 1 ! 2 49 10008~0000 CCSW GCT 99 000 O0 0 3 ] 1 2 79 1000810000 HV GCT V 99 000 O0 0 3 ! 1 2 49 1000810000 DATA DEPTH = 65535.500 FEET TOD.GCT 366380726 TIME,GCT TDEP.GCT i00,O00 DIFF,GCT GCSP,GCT 16744,184 AANG.GCT CDpT.GCT ~00,000 CWEL.GCT ED,GCT 0,000 GDEP.GCT R2AN.~CT 235,375 RAZI,GCT RND.GCT 0,000 RTVD.GCT TVD.GCT 92.000 VSEC,GCT CCSW.GCT 4,096 HV,GCT 8877,000 0,000 0 000 92 000 189 485 0 000 0 000 250 500 ETI~.GCT TENS.GCT AXAN,GCT DER2,GCT ND,GCT RDPT,GCT SROT,GCT VSTR,GCT 8.877 CS.GCT 008 AZIN,GCT -0'341 DEVI,GCT 0.000 R1AN,GCT ~00..000 RED~GCT 0.000 TICK.GCT 0.000 CTEM,GCT 25 254 0 -0 0 263 23 344 750 485 071 076 000 400 750 :hlumberqer Alaska Computinc] Center DEPTH = 65183.000 FEET TOD.GCT 36638707.1 TI~E.GCT TDEP.GCT 13110.850 DIFF.GCT GCSP.GCT 0,000 AANG.GCT CDPT.GCT 13110,844 CWEL~GCT ED.GCT 7522,566 GDEP.GCT 2AN,GCT 235'375 RAZI,GCT RRND.GCT 8441,172 RTVD,GCT TVD,GCT 9272~20 VSEC.GCT 9000.000 ETI~ GCT 4.050 TENS GCT 0'006 AXAN GCT 3'880 DER2 GCT 13i02i844 ND GCT 359,984 RDPT GCT 9180; 20 SROT GOT 8445,~2 VSTR GCT · 249'3 5 END OF DATA 6353.867 CS.GCT GCT 18!5;000 ,0:'009 AZI~,GC? 0,.210 DEVI.GCT 3841'324 R1AN.GCT GCT RED. 13110,844 21,~500 TICK,,GCT 0..000 CTE~,GCT 199'875 21'848 . 21,8~9 302;248 6608,,100 68,,250 **** FILE TRAILER **** FILE ~A~E ~ GCT ,003 SERVICE : bOG VERSION ~ 32.4 DATE : 91/08/I1 ~lX REC SIZE : 1024 FILE TYPE : PR bAST FILE : **** FILE HEADER FILE NAME : GCT .005 SERVICE : LOG VERSION : 32 4 DATE : 91}08/11 ~X REC SIZE : 10~4 FILE TYPE : PR LAST FILE : ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE , 64EB ** ''''''''''''''''''''''''''''''T PE EPR CODE ALUE 2 66 0 3 79 120 4 66 1 5 66 0 6 73 0 7 65 INCH 8 73 60 9 65 .lIN IS Ta~e Verification Llstinq chlu~berqer Alaska Computinq Center 19-AUG-~991 11:31 TYPE REPR CODE vALUE 11 66 8 12 68 13 66 1 14 65 !IN ~S 66 16 66 0 66 1 ., ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 AP1 AP1 API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE.CLASS MOD NUMB SA:MP EbEM ..CODE (HEX) .. TOD GCT S g9 000 O0 0 5 ! I 4 73 020'0800000 TIME GCT MS 99 636 21 0 5 I 1 4 68 0000800000 ETIM GCT S 99 636 2t 0 5 i I 4 68 0000800000 CS GCT F/HR 99 6'36 21 0 5 1 I 2 49 0200800000 TDEP GCT F 99 636 21 0 5 l, 1 4 68 0000800000 D!FF GCT F 99 636 21 0 5 1 1 4 68 0000820000 T~NS GCT LBF 99 635 21 0 5 1 1 4 68 0000800000 MARK GCT F 99 150 01 0 5 1 1 2 49 0000800000 GCSP GCT F/HR 99 000 O0 0 5 1 1 4 68 0000800000 AANG GCT DEG 99 000 O0 0 5 1 1 4 68 0000820000 AXAN GCT DEG 99 615 O0 0 5 1 1 4 6'8 00008~0000 A~IM GCT DEG 99 630 l! 0 5 1 1 4 68 0000800000 CDPT GCT F 99 000 O0 0 5 1 ! 4 68 0000820000 CWEL GCT D/HF 99 000 00 0 5 1~ 1 4 68 0000800000 DER2 GCT DEG 99 000 O0 0 5 1 1 2 49 0000820000 D~VI GCT DEG 99 620 11 0 5 1 1 4 68 0000800000 ED GCT F 99 000 00 0 5 1 1 4 68 0000800000 GDEP GCT F 99 000 O0 0 5 1 1 4 68 0000800000 ND GCT F 99 000 00 0 5 ! ! 4 68 0000800000 RIAN GCT DEG 99 000 00 0 5 1 ! 4 68 0000820000 R2AN GCT DEG 99 000 00 0 5 1 1 2 49 0000820000 RaZI GCT DEG 99 630 11 0 5 1 1 4 68 0000820000 RDPT GCT F 99 000 O0 0 5 ! 1 4 68 0000820000 RED GCT F 99 000 00 0 5 1 I 4 68 0000820000 RND GCT F 99 000 O0 0 5 1 t 4 68 0000820000 RTVD GCT F 99 000 00 0 5 I 1 4 68 0000820000 SROT GCT REV 99 000 O0 0 5 1 1 4 68 0000800000 TIC~ GCT S 99 000 O0 0 5 ~ 1 4 68 0000800000 TVD GCT F 99 960 01 0 5 1 I 4 68 0000800000 VSEC GCT F 99 000 O0 0 5 1 ~ 1 4 68 0000800000 VSTR GCT F 99 000 O0 0 5 1 1 2 49 0000820000 CTE~ GCT DEGC 99 660 2! 0 5 1 ~ 2 49 10008~0000 CCSw GCT 99 000 00 0 5 1 1 2 79 1000810000 HV GCT V 99 000 00 0 5 1 1 2 49 1000810000 ~mmmmmmmmmmmmmmmmmmmmm~mmmm~#mmmmmmmm#mm~mmmmmmmmmmm#mmmmmmmmmm#m#m~mmmmmmm~mmm#Mmmmmm ~$ TaDe verif~catloD List~inq :hlumberoer AlasKa ComPutln~ Center TOD.GCT TDEP.GCT GCSP.GCT CDPT.GCT ED.GCT R2AN.GCT RMD'GCT TvD.GCT CCSW.GCT TOD.GCT TDEP.GCT GCSP.GCT CDPT.GCT En. GCT R2AM.GCT RND.GCT TVDGCT CCSW~GCT ** DEPTH = 65535.500 FEET 366387180 TIME.GCT 111!0,900 DIFF,GCT 0.000 AANG,GCT 13110,895 CWEL,GCT 7522~583 GDEP,GCT 235,375 RAZI'GCT 844i'191 RT~D~GCT 9272~967 VSEC,GCT 4096 HV,GCT DEPTH = 65263,000 FEET - 366392085 TIME,GCT 100,100 DIFF,GCT 0,000 AANG.GCT 100.100 CWEL,GCT 16,683 GDEP'GCT 235,375 RAZI.GCT 11.497 RTVD'GCT 89'027 VSEC.,GCT 4096 HV'GCT ** END OF DATA 19-AUG-].ggl 1~ :31 8876.000 ETI~.GCT 4.100 TEN$.GCT 0,006 AX.AN~GCT 3.880 DER2.~CT 13102~895 ND~GCT )59.984 RDPT,GCT 9180'967 SROT4GCT 8445'691 VSTR,GCT 250,500 9002,000 1.300 20 o 0 0 92 100 ii 181 249 375 ETXM,,GCT TEN$,GCT AXAN'GCT DER~,GCT _ ND,GCT ~DP'T.GCT SROT.GCT VS?R,GCT 8.876 CS.GCT 1865.000 MARK.GCT -0.002 AZIM.GCT -0 210 DEVI.GCT 384~.~ 332 RIAN,GCT 13110 895 RED.GCT -2~'.500 TICK.GCT 0,000 CTEM.GCT 4913.865 CS-GCT 470.000 ~ARK.GCT 0,.001 AZIM.GCT 0.397 DEVI.GCT 00 RED.GCT 6.000 TICK,'GCT 00 CTEM,GCT PAGE{ 5 200.250 18,750 64,984 21,847 21,844 -302'248 6717,399 70,250 199.875 1~.,750 318'73! 0~034 14:,821' !1622,100 29,641 **** FILE TRAILER **** FIL~ MA~E : GCT ,005 SERVICE i LOG VERSION : 32,4 DATE i 91/08/11 MAX REC SIZE : 1024 FIL~ TYPE : PR L~ST FILE : **** TAPE TRAILER **** SFRVICE NAME : PM13 DATE : 91/08/11 ORIGIN : CSU TAPE NA~E : 422562~ CONTINUATION ~ : 00 PREVIOUS TAPE COMMENT : SCHLUMBERGER WELL SERVICES CSU TAPE ES Tape Veriflcatlon Llstlnq :hlumberger Alaska Comp%}tlnq Center lg-AUG-Ig91 11231 PAGE{ **** REEL TRAILER **** SERVICE NAME : PM13 DATE : 91/08/11 ORIGIN : CSU REEL NAME : 422562~ CONTINUATION # : O0 PREVIOUS REEL COMMENT : SCHLUMBERGER WELL SERVICES CSU TAPE ALASKA COMPUTING CENTER * ******************************* · ------' SCHLUMBERGER COMPANY NAME WELL NA~E FIELD NAME BOROUGH STATE API NUMBER REFERENCE NO B,P, EXPLORATION INC, POINT MCINTYRE #13 POINT MCINTYRE NORT~ S'bOPE ALASKA 74~050 0~9-22192-00 RECEIVED ,JUN 2 ~ 199,?. Alask~ 011 & Gas Corm. Commission IS Tape Verification Listing cblumberger Alaska Computing Center 14-AOG-i991 09:08 PAGE~ 1 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 91/08/1.4 ORIGIN : FLIC REEL NAME . : 74807 CONTINUATION ~ : ' PREVIOUS REEL : COMMENT : B,P, EXPLORATION INC,,POINT MCINTYRE,POINT MCINTYRE #13,50-059-22 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 91/08/14 ORIGIN : FLIC TAPE NAME : 74807 CONTINUATION # : I' PREVIOUS TAPE COMMENT : B,P. EXPLORATION INC,,POINT MCINTYRE,POINT MCINTYRE **** FILE HEADER **** FILE NAME : EDIT ,001 SERVICE : FbIC V~RSION ~ 00tA06 DATE : 91/08/!4 MAX REC SIZE : 1024 FIL~ TYPE : LO LAST FILE : ******************************************************************************** ******************************************************************************** ** ** ** SCHLUMBERGER WELL SERVICES ******************************************************************************* ******************************************************************************* COMPANY NAME: B.P, EXPLORATION INC. WELL: POINT MCINTYRE #13 FIELD: POINT MCINTYRE BOROUGH: NORTH SLOPE STATE: ALASKA AP1 NUMBER: 50-029-22192-00 LOCATION: 520' FNL & 4257' FEL SECTION: 14 TOWNSMIP: 12N RANGE: 14E PERMANENT DATUM: MEAN SEA LEVEL ELEVATION: 0 LOG MEASURED FROM RKB 39.0 ABOVE PERMANENT DATUM Tape veri~icati, on t, Isting 14-AUG-1991 09:08 PAGE: 2 :hlumberger AlasKa ComPutln~ Center ELEVATIONS KB: 39,0 DF: 42,:3 GL: 4,0 DATE LOGGED: RUN NUMBER: TD DRILLER: TD LOGGER: CASING 5-AUGUST-1991 13250 13247 9,625 DRILLER DEPTH OF 12737 AND 50GGER DEPTH OF 12739,0 BIT SIZE 1: 8.5 TYPE FLUID IN HOLE: CORE FLUID DENSITY: 10.1 ¥ISCOSITY: 59 PH: 7,1 FLUID LOSS~ 3,8 ~UD RESISTIVITY: - 0,761 ~ 62 FILTRATE RESISTiViTY: 0.59 ~ 62 MUD CAKE RESISTIVITY: 1~,32 ~ 62 TIME CIRCULATION ENDED: 18:30 ~AXIMUM TE~P RECORDED: 156 LOGGING DISTRICT: PRUDHOE BAY LOGGING E~GINEER: G..SARBER WITNESS: STEPANEK,ZARNDT,BLUNDELL TOOL NUMBERS: A~$-A SGT-L DIS-MB 379 CNC-HA 398 GPIC-A 834 FTELD RE~ARKS~ TCC-B SLS-WA 2001 NGC'C 1935 DRs-C 4950 THE DEPTHS GIVEN ON THE HEADER FOR RKB, DRILL FLOOR AND GROUND LEVEL ARE ESTIMATED. THE FINAL SURVEY WILL ~E MADE WHEN THE RIG ~OVES OFF'LOCATION.~ THE GAIN ON THE SONIC WAS INCREASED BETWEEN LOGGING PASSES DUE TO A CYCLE SKIP ON THE ~AIN PASS 20' OF 50G DATA ON THE MAIN PASS WAS SPLICED OUT AND REPLaCeD WITH GOOD DATA FROM THE REPEAT SECTION ON THE SONIC LOG.' DATE JOB STARTED: 13-AuG-g1 JOB REFERENCE NO: 74807 LDP/ANA: S. DEES FILE - EDIT.O0! IS Ta~e Ver{Aflcatlon c~lum, erger las~a Co~u<ing Center 14,,'AUG,.1991 09:08 B.P. EXPLORATION INC, POINT MCINTYRE POINT MCINTYRE #13 50'029'22192'00 DITE LOG DATA FROM FIELD FILE DITE.O09 BHC LOG DATA FROM FIELD FILE DITE'009 GPIT LOG DATA FROM FIELD FILE GPI~,OI8 LDTD LOG DATA FROM FIELD FILE GPIT,O18 CNTH bOG DATA FROM FIELD FILE GP!T'O18 NGTD LOG OATA FROM FIELD FILE GPIT,0i$ DATA SAMPLED EVERY -,5000 FEET DATA INCLUDED - TOOL EXTENSION TOOL TYPE USED NAME DIT-E ,DTE BHC ,BHC GPlT 'GPI LDT ,LDT CNT-A/D/H ,CNL NGT ,NGT PHA$OR DUA~ INDUCTION SFb= BOREHOLE COMPENSATED SONIC GENERAL PURPOSE INCLINOMETRY TOOL LITHO DENSITY COMPENSATED NEUTRON ,,, NATURAL GAMMA SPECTROSCOPY PAGE: 3 TABLE TYPE : CONS TUNI VALU DEFI . CN B P.-EXPLORATION INC. Company Name FN P6INT MCINTYRE Field Name wN API~ SECT COUN STAT NLTt LATI PDAT EPD APD FT FT FT POINT MCINTYRE #13 50-029-22~92-00 520' FNL & 4257' FEL ~4 14E NORTH SLOPE ALASKA USA STEPANEK,ZARNDT,BLUNDELL 548209 ~EAN SEA LEVEL 0 39. 39, Well Name AP1 Serial Number Field Location Section Townsh{p RanGe County State or Province Nation Latitude Longitude Witness' Name Service Order Number Permanent datum Elevation of Perm, Datum Log Measured From ABOVE PERMANENT DATUM Elevation of Kelly Bushin~ [$ TaPe verification bisting :hlumberger AlasKa Computino Center 14-AUG-t991 09:08 PAGE: 4 TUNI VALU DEFI ELF FT 42,3 EGL FT 4 ' TLI FT 12 DFT COR~ ~bUI DF[) G/ca !0,! DFP~ 7 I DFV CP 5~ DFL F3 RMS OHMM 0~761 FS MFST DEGF R cs MCST DEGF TC$ 18,30 STEM Elevation of Derrick Floor Elevation of Ground bevel Total Depth - Driller Total Depth - Logger Bottom Log InterVal Log Interval T°lllingDr Fluid Type Dr!~.lng Fluid Ph Dril~lng Fluid Viscosity i~g Fluid Loss ~ud Sample. Temperature Resistivity of mud filtrate s Mud Filtrate Sample Temperatu Resistivity o~ Mud Ca~eSampl Mud Cake Sample Temperature Time Circulation Stopped DEGF 20. Surface Temperature. BHT DEGF 156, : Bottom Hole Tempe'rature TABLE TYPE : CURV DEFI DEPT CIDP IDPH CIMP CILD ILD IDQF IIRD IIXD IIR~ IIXM SFL!! GR TENS MTEM MRES HTEN DT TT2 TT3 De~th Channel Name IN UCTION DEEP PHASOR CONDUCTIVITY INDUCTION DEEP PHASOR RESISTIVITY INDUCTION ~EDIU~ PHASOR CONDUCTIVITY INOUCTION MEDIUM PHA$OR RESISTIVITY Deep Induction Standard Processed Conductivity Deep Induction Standard Processed Resistivl~ ~edlum Induction Standard Processed Conducti¥it¥ Medium Induction Standard Processed Resistivity IDQF DEEP INDUCTION QUALITY FACTOR XMQF MED INOUCTION QUALITY FACTOR Deep Induction Real Intermediate Conductivity Deep Induction Quad Intermediate Conductivity ~edium InductXon Real Intermediate Conductivity ~edium Induction Quad Intermediate Conductivity 8FL Resistivity (unaveraged) Spontaneous Potential Gamma Ray Tension Mud Temperature MUD Resistivity Head Tension DELTA-T TRANSIT TI~E TRANSIT TIME TRANSIT TIME 3 IS TaPe Verification Listing chlumbergerAlasKa Computing Center 14-AUG-!ggl 09~08 DEFI TT4 TRANSIT TIME 4 SP TENS MTE~ HTEN SGR CGR TENS NTEM MRES C~LI HDIA RHOB D~O OLS ~L LIT~ LSHV SSHV S1RH LSRH CALl RB HAZI P~AZ CGR TENS MTE~ M~ES HTEN NPH! RTNR TNpH ?NR~ NDOR RCNT Spontaneous Potential Gamma Ray Tension Mud Temperature hUD Resistivity Head Tension Spectroscopy Gamma-Rag Computed G from Thorium, Uranium, Potassium Tension Mud Temperature MUD Resistlvity Head Tension Hole amete'r Relative Bearing Large Arm Small Arm Mlcro-Inver Re istl itY Densit Porosity BUlK D[nslty Delta RHO Photqelectric Factor Quality control of long spacing for bDT Quality control on short spacing for bDT Long SP t d Count Ra ) acino.ComPu e te ~Lb+LU/2 bong UPper 1-2 Window Count Rate (bUI+LU2) Long 5ower~wtndow Count Rate Litholog Wlndow Count Rate Short Spacing 1 Window Count Rate Short Spacing 2 Window Count, Rate Long Spacing High Voltage Output Short SPaci~g High Voltage Loop OutPut Short Spacing 1.Density 'RHOB Co Lon~ spacin (Un rrecte d) Long u R PDer HOB Caliper Relative Bearing Hole Azimut~ Pad 1 Azimuth Spectroscopy Gamma-Ray Computed GR from Thorium, ~ran~um, Potassium Tension ~ud Temperature MUD Resistivity Head Tension Neutron Porosity Raw Thermal Neutron Ratio Thermal Neutron Porosity Calibrated Thermal Neutron Ratio Neutron Porosity OutPut From an ~Pplication Program RCNT Tape verification Ltstin~ ~hlumberger Alaska Computin~ Center 14-,AUG-~991 09:08 DEFI RCFT RCFT CNTC CNTC , CFTC CFTC SGR Spectrosc~ ~Gamma-Ra¥ uranium Potassium CGR Computed ~¥~rom Thorium, , CAL! Caliper TENS Tension MRES MUD Resistivity MTEM Mud Temperature HTEN Head Tension $~R Spectroscopy Gamma-Ray ~ CGR Computed GR from Thorium, Uranium, PotaSS~um~ THOR Thorium POT,~ Potassium ~ URA~ Uranium W~N~ window I (,15~ - 15 ~EV) W2NG window 2 ( 5 I ~EV) W3NG window 3 ({.1 - {,6 MEV) W4NG Window 4 (I,6 - ~ MEV) W5NG window 5 (~ -3 ~EV) T~NS Tension ~TE~ ~ud TemPerature M~ES MUD Resistivity CS Cable Speed HTEM Head Tension ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64ES ** TYPE REPR. CODE VAbUE 1 66 0 ~ 66 0 3 73 416 4 66 1 5 66 6 73 7 65 9 65 1~ 66 1~ 68 ~3 66 0 ~4 65 FT 15 66 68 16 66 0 66 0 PAG~ 6 .I~ TaLe verification L~st~no Chlumberoer AlasKa Computing Center 14-AUG.199! 09~08 %* SET TYPE - CHAN $~ NAME SERV UNIT SERVICE AP1 API API API FILE NUMB NUMB SIZE REPR PROCE~,$~S ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE , (HEX) DEPT FT 548209 00 000 00 0 ! I 1 4 68 0000000000 CIDP DTE MMHO 548209 00 IDPH DTE OH~M 548209 00 ClNP DTE M~HO 548209 O0 IMP~ DTE OH~N 548209 O0 CILD DTE ~MHO 548209 00 ILD DTE OHM~ 548~09 00 C!L~ DTE MM~O 548209 00 ILM DTE OHM~ 548209 O0 IDQF DTE 548209 00 I~OW DTE 548209 00 IX~D DTE ~MHO 548209 00 II×D DTE M~HD 548209 O0 ItR~ DTE M~HO 548209 O0 IIX~ DTE MMHO 548209 00 SFLU DTE OHMN 548~09 O0 SP DTE NV 548209 00 GR DTE GAPI 548209 00 T~$ DTE LB 548209 O0 NTE~ DTE DEGF 548209 O0 NRES DTE OHM~ 548209 00 HTE~ DTE LB 548209 00 DT BHC US/F 548209 00 TT! BNC US 548209 00 TT2 BHC US 548209 00 TT3 BHC US 548209 00 TT4 BHC US 548209 00 SP BHC NV 548209 O0 GR BHC GAPI 548209 00 TENS BHC LB 548209 00 MTEM BHC DEGF 548209 O0 ~ES BHC DHMM 548209 00 HTEN BHC LB 548209 O0 SGR GPI GAPI 548209 O0 CGR GPI G~PI 548209 00 TENS GPI LB 548209 00 MTE~ GPI DEGF 548209 00 MRES GPI OHM~ 548209 O0 HTEN GPI LB 548209 O0 CALI GPI I~ 548209 00 HDIA GPI FT 548209 O0 RB GPI DEG 548209 O0 LA GPI IN 548209 O0 SA ~PI I~ 548209 O0 MNO~ GPI OHM~ 548209 O0 MINV GPI O~M 548209 O0 DDHT LDT PU 548209 00 RHOB DDT G/CB 548209 00 DRHO LDT G/C3 548209 00 P~F LDT 548209 O0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 00 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 i t 1 4 68 0000000000 i 1 I 4 68 0000000000 I ! t 4 68 0000000000 1 ! ! 4 68 0000000000 I I I 4 68 0000000000 1 ~ 1 4 68 0000000000 1 ~ 1 4 68 0000000000 I ! 1 4 68 0000000000 1 1 1 4 68 0000000000 I 1 1 4 68 0000000000 I t I 4 68 0000000000 1 I 4 68 0000000000 I I 1 4 68 0000000000 I I I 4 68 0000000000 ! 1 1 4 68 0000000000 I 1 I 4 68 0000000000 1 1 1 4 68 0000000000 I 1 1 4 68 0000000000 I I I 4 68 0000000000 1 1 I 4 68 0000000000 I .I I 4 68 0000000000 I 1 1 4 68 0000000000 1 1 1 4 68 0000000000 I ! 1 4 68 0000000000 1 1 1 4 68 0000000000 i ! 1 4 68 0000000000 t 1 1 4 68 0000000000 I t 1 4 68 0000000000 1 1 1 4 68 0000000000 ! 1 1 4 68 0000000000 1 1 I 4 68 0000000000 1 1 1 4 68 0000000000 I 1 1 4 68 0000000000 I ! 1 4 68 0000000000 1 1 1 4 68 0000000000 I 1 1 4 68 0000000000 1 1 1 4 68 0000000000 I 1 1 4 68 0000000000 ! 1 1 4 68 0000000000 I 1 1 4 68 0000000000 1 ! 1 4 68 0000000000 1 1 I 4 68 0000000000 i 1 1 4 68 0000000000 I 1 I 4 68 0000000000 I 1 1 4 68 0000000000 1 1 1 4 68 0000000000 ! 1 1 4 68 0000000000 1 ! 1 4 68 0000000000 1 1 i 4 68 0000000000 .-hlUm erqer laska Comput ng Center 14-AUG-I99! 09:08 NAME SERV UNIT SERVICE API AP! API AP! FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # 50G TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) OL$ LDT 548209 O0 OSS LOT 548209 O0 LB LDT CPS 548209 O0 LU LDT CPS 548209 O0 LL LDT CPS 548209 O0 LITH LDT CPS 548209 O0 SS1 LDT CPS 548209 O0 $S2 LDT CPS 548209 O0 LSHV LDT V 548209 O0 $SHV LDT V 548209 O0 SlRH LDT G/C3 548209 O0 LSRH LDT G/C3 548209 00 LURH LDT G/C3 548209 O0 CALl LDT IN 548209 O0 RB LDT DEG 548209 O0 HAZI LDT DEG 548209 O0 PIAZ LDT DEG 548209 O0 SGR LDT GAPX 548209 O0 CGR LDT GAPi 548209 O0 TENS LDT LB 548209 O0 MTEM LDT DEGF 548209 O0 MRES LDT OHMM 548209 O0 HTEN LDT LB. 548209 00 NPHI CNL PU 548209 O0 RTNR CNL 548209 O0 TNPM CNL PU 548209 O0 TNR~ CNL 548209 O0 NPOR CNL PU 548209 O0 RCNT CNL CPS 548209 O0 RCFT CNL CPS 548209 O0 CNTC CNL CPS 548209 00 CFTC CNL CPS 548209 O0 SGR CNL GAPI 548209 O0 CGR CNb GAP! 548209 O0 CALl CNL IN 548209 O0 TENS CNL LB 548209 O0 MRES CNL OHMM 548209 O0 ~TE~ CNL DEGF 548209 O0 HTE~ CNL LB 548209 O0 SGR NGT GAPI 548209 O0 CGR NGT GAPI 548209 O0 TNO~ NGT PPM 548209 O0 POTA NGT PU 548209 O0 UPAN NGT PPN 548209 00 WiNG NGT CPS 548209 O0 W2NG NGT CPS 548209 O0 W3NG NGT CPS 548209 O0 W4NG NGT CPS 548209 O0 WLNG NGT CPS 548209 O0 TFN$ NGT LB 548209 O0 MTE~ NGT DEGF 548209 O0 000 O0 0 1 1 1 4 68 000 O0 0 1 ! I 4 68 000 O0 0 i 1 1 4 68 000 O0 0 ! ! 1 4 68 000 O0 0 ! 1 1 4 68 000 O0 0 I 1 1 4 68 000 O0 0 1 l:i 1 4 68 000 O0 0 ! !< 1 4 68 000 O0 0 i 1. 1 4 68 000 O0 0 1 1 1 4 68 000 O0 0 1 I I 4 68 000 O0 0 1 1 : I 4 68 000 O0 0 I 1:i I 4 68 000 O0 0 1 1 I 4 68 000 O0 0 1 I , I 4 68 000 O0 0 1 1 1 4 68 000 O0 0 ! I 1 4 68 000 O0 0 1 1<: 1 4 68 000 O0 0 1 1:: 1 4 68 000 O0 0 I ! : 1 4 68 000 O0 0 ! t I 4 68 000 O0 0 I ! i 4 68 000 O0 0 1 1 1 4 68 000 O0 0 I 1 '~ 1 4 68 000 O0 0 I 1 I 4 68 000 O0 0 i 1 I 4 68 000 O0 0 1 1 1 4 68 000 O0 0 I i 1 4 68 000 O0 0 1 I 1 4 68 000 O0 0 1 I 1 4 68 000 O0 0 1 1 1 4 68 000 O0 0 I I 1 4 68 000 O0 0 ! 1 1 4 68 000 O0 0 1 I I 4 68 000 O0 0 ! ! I 4 68 000 O0 0 i 1 1 4 68 000 O0 0 1 ! I 4 68 000 O0 0 1 1 1 4 68 000 O0 0 1 1 1. 4 68 000 O0 0 I 1 1' 4 68 000 O0 0 1 i 1 4 68 000 O0 0 1 I 1 4 68 000 O0 0 i 1 I 4 68 000 O0 0 1 I 1 4 68 000 O0 0 1 I 1 4 68 000 O0 0 I I 1 4 68 000 O0 0 1 1 1 4 68 000 O0 0 1 1 1 4 68 000 O0 0 1 1 I 4 68 000 O0 0 ! 1 1 4 68 000 O0 0 ! 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 o000000000 0000000000 0000000000 00000o0000 0000000000 0000000000 0000000000 iS Tame Verification Listing chlumbergerAlaska Computing Center 14-AUG-!991 09:08 PAGE: NAME SERV UNIT SERVICE API API APl API FILE NUMB NUMB SIZE REPR PROCESS ID O~DER # 50G TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) MRE$ NGT OHMM 548209 O0 000 O0 0 I i 1 4 68 0000000000 CS NGT F/HR 548209 O0 000 O0 0 1 1 1 4 68 0000000000 HTEN ~GT LB 548209 O0 000 O0 0 ~ ~ 1 4 68 0000000000 ~* DATA DEPT' IMPH,DTE ILM.DTE IIXD.DTE SP.DTE MRE$.DTE TT2,BHC GR..BHC HTEN.BHC H IR.GPI MNOR,GPI DRHO.LDT LS.LDT SSl'LDT RB,LDT CGR.LDT HTEN'LDT TNRA.CNL CNTC.CNL CAL! CN5 HTEN CNL POTA,NGT W3NG,NGT ~TEM.NGT DEPT. IMpH DTE IL~iDTE IIXD'DTE SP,DTE M~ES.DTE TT2.BHC G~.BHC HTE~.BHC MTE~.GPI HDIA.GPI ~NOR,GPI DgHO.LDT LS.LDT SS].LDT $~RN.LDT 13274.500 2.29! 7~ 289 52O -20 000 0:150 -999 250 105 10~ '0 957 -999 250 ~999 250 -999 ~50 -999 250 -999 250 -999 250 -999 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 ~50 -999 250 13200 000 2 532 2 465 63 583 -14,813 0,150 439,600 101,862 575.250 -999.250 -999,250 -999.250 :999.250 999.250 -999.250 -999.250 CIDP,DTE CtbD,DTE ID~F*DTE IIRM*DTE GR,DTE HTEN'DTE TT3~BHC TENS'BHC SGR'GPI MRE~GPI RB;GPI MINV~GPI PEF. LDT LUiLDT SS2~LDT LSRM~LDT HAZI=LDT TENS LDT NPHICNL NPORCNL CFTC~CNL TENS. CNL SGR NGT URAN NGT w4NG, NGT MRE$ NGT CIDP,DTE CIbD~DTE IDDF,DTE IIRM.DTE GR,DTE HTEN DTE TT3iBMC TENS, BHC SGR,GPI MRES.GPI RB,GPI ~INV,GPI PEF,LDT LU'LDT SS2~LDT LSRH,LDT 450.838 45[~425 0'000 404.4~5 105;102 ~0,957 '999,250 2075.000 '999,'250 '999.250 '999 250 -999 0 -999 0 -999 250 -999 50 -999 ~ 0 '999 0 '999 0 '999 250 "999 50 '999 ~50 '999 250 07 478 05 013 0 o0 376 28~ 101 862 575 250 624 400 5975 000 -999 250 -999 -999 250 -999 250 -999 ~$0 -999 250 ~999 250 ~999 250 ~DPH'DTE ILD~.DTE INOFi,'DTE IIXM:.~DTE TEN$,OTE DT~,BHC TT41, BHC MTEM,,BHC CGR~GPI HTEN,:~GPI LAi~GPI DPMi,~LDT OL$,UDT Lb~"LDT LSHV~LDT LURM*5DT PlAg,:LDT MTEM~LDT RTNRiCNL RCNTiCNL SGRiCNL MRES, CNL CG~,NGT WlNG~,NGT WLNG~NGT C$~NGT IDPH,DTE ILD,DTE I~OF~DTE IIXM~,OTE TE~.DTE ,BHC TT4,BHC MTEM,SHC CGR,GPI HTEN~GPI LA,GPI DPHI,LDT OL$,LDT LL,LDT I.SHV,LDT LURH,LDT 2'218 CI)4P DTE 2,2~5 CILM DTE 0 000 IiRD DTE -999 ~56 -999 -999 -999 -999 -999 -999 -999 ~999 -999 -999 -999 -'999 -999 -999 -999 -999 -999 -999 .960 SFLU DTE 000 MTEM,DTE 900 TTI~BHC · 250 SP,BHC .849 MRES,BHC ~250 TENS.GPI .:~50 I,GPI 150 CAb SA GPI .250 RMOB :250 0SS 250 blTH ,~50 SSHv 50 CALl ,250 50 TNPH ,250 RCFT ,~50 250 NTE~ 25O THOR ,:250 W2NG 25O TENS 25O HTEN LDT LDT LDT bDT LDT bDT bDT CNL CNL :CNb CN5 NGT .NGT .NGT NGT 2,454 CIMP,DTE 2,469 CILM'DTE 0 :~00 IIRD.DTE 31~ 61 SFLU,DTE 5975.000 MTEM,DTE 95,400 TTt.BHC 429 600 SP.BHC 156 655 MRES.BHC -999 -999 -999 -999 -999 -999 -999 -999 250 TENS GPX 250 CALI:GPI 250 SA,GPI 250 RHOB.LDT 250 OSS.LDT 250 LITH,LDT 250 SSHV.LDT 250 CALI.LDT 436 472 436 90 365 41~8 156 849 -999 250 '20 000 .0 150 '99'9 250 -999~ 250 '999' :250 '999 250 -999 250 '999 250 · ,999 250 -999 50 "999 '99~ 250 '"99 150 8o '9999 '9~ 250 '99 250 -, o '999 394.917 405.633 335,486 .-3,005 1'56'655 630'000 . 999.250 -999.250 -999 250 -999 250 -999250 -999 250 -999.250 -999 250 Tape Verification Listinq ..hlumberqer Alaska Computinq Center 14-AUG-1991 09:08 RB,LDT CG~,LDT HTEN.LDT TNRA,CNL CNTC.CNL C.ALI.CNL HTE~{,CNL POT=A,NGT W]NG,NGT MTE~,NGT DEPT, I~P~,DTE L~'DTE IIXD.DTE SP.DTE MRES.DTE TT2,BHC GP,BHC HTEN,BHC MTEM.GPI HDIA*GPI MNOR.,GP! DRHO,LDT LS,LDT $$1,LDT S1R~LDT RB~LDT CGP,LDT HTEN,LDT TNRA.CNL CNTC.CNL CALI.CNL HTEN,CNL POTA.NGT W3NG.NGT MTEM.NGT DEPT. IMPH,DTE IL~,DTE IIXD,DTE SP.DTE M~ES,DTE TT~,BHC GR BHC HTEN~BHC MTE~,GPI MDI4.GPI MNO~ DRHO]LDT LS.LDT SSl.LDT $1R~.LDT RB,LDT "999,250 '999,250 '999,250 '999,250 '999,250 '999'250 '999,250 '999+250 '999,250 '999,250 !3100,000 4;958 4.745 34,565 '25.500 0:150 365 800 80 971 586 252 162 6!7 10 2 886 0 015 233 537 197 633 2 457 180 493 83 471 738 864 3 564 2402 033 8,753 738,864 2,518 40,336 162,746 13000.000 1,735 745 -36'500 0,149 394,800 25,590 569,670 593 2,040 '0,003 389 268 204:860 2,230 185,701 HAZI LDT TENS LDT NPHI CNL ~POR CN5 CFTC CNL TENS CNL SGR NGT URAN NGT W4NG NGT ARES NGT CIDP DTE CILDDTE IDOFDTE IIRM DTE GR DTE HTEN DTE TT3 BHC TENSBHC SGR. GPI ~RES. GPI RB. GPI ~INV. GPI PEF,LDT LU~LDT SS2,LDT LSRH,LDT' HAZI,LDT TENS~LDT NPHICNL NPOR CNL CFTC CN5 TENS CNL SGR NGT URAN NGT W4NG. NGT MRES. NGT CIDP~DTE CILD'DTE IDOF.DTE IIRM,DTE GR,DTE HTEN,DTE TT3.BHC TENS, BHC SGR.GPI MRES.GPI RB.GPI ~INV,GPI PEF.LDT LU,LDT SS2,LDT LSRH,LDT HAZI.LDT -999 250 -999 50 -999 ~50 -999 :250 -999 50 -.999 '999 250 '999 250 '999 250 '999 250 7!6 0 000 19B 032 80 971 58 92~ 252 8OO 5795 000 95 865 0 ,14 18o 435 523 227 68 267 31 2 16 61 14 6395 000 44 004 59 .369 610 813 6395 000 95 865 I 530 7203 0 !46 59 32 0,000 525, 569,670 562'800 5770,000 26,534 0,146 185,70! 1 903 2 476 357 354 296 209 2 61 745 PIAZ, LDT M?E~<'LDT RTNR,CNL RCNT.CNi~ MR~E$ CNb C~GR NGT W lNG NGT WLNG NGT CS NGT , H,DTE I ~DTE ~ DTE T ~, BHC 4 , B.C BHC GP1 .bDT h~ bDT P 5DT M~ R~ CNb R~ CNL CNL CNL NGT W NGT W NGT NGT ~UeH DTE O DTE IM~F DTE I!XM DTE TENS DTE TT4 BHC ~TE~ B~C CGR GP I HTEN,GPI bA,GPI DPHI,bDT Q~S,bDT bL,LDT LSHV,LDT LURH, bDT P1AZ,LDT -999.250 SGR,LDT -999,250 ~RES.LDT -999'250 TNPH,CNL -999...250 RCFT,CNL -999.250 CGR,CNL -999,.250 ~TE~,CNL -999j~250 THORjNGT -999'250 W2NG,NGT -999,250 TENS,NGT -999,250 HTEN'NGT 0 20 5795 77 363 157 83 738 8 7 -0 119 1441 21 CI~P~DTE g61 CIb~'DTE 000 IIRD.DTE 977 SFLU*DTE 000 MTEM DTE 900 TT~ BHC 200 SP BHC 687 MAES BHC 471 TENS GPI 864 CALI GPI 664 SA 241 RHOB LDT 004 OSS,LDT 853 LITH*.LDT 849 SSHV.LDT 2~524 CALI,LDT 242,146 SGR,LDT {62*746 MRES,LDT 3'691 TNPH,CN5 2097'.963 RCFToCNL 95'865 CGR.CNL 0,146 MTEM.CNL 83.471 THOR.NGT 305'402 W2NG,NGT 11,044 TENS.NGT 834~568 HTEN,NGT 1,683 CI~P,DTE 1~662 CILM.DTE 0.000 iIRD,DTE 52.513 SFLU,DTE 5770.000 MTEMiDTE 86 550 TT1.BHC 389~600 SP,BHC 158,596 MRE$,BHC 10.451 TEN$,GPI 661.148 8.325 26 453 0 001 210 591 1444 247 2 231 247 866 CALl SA:GPX RHOB.LDT OSS.LDT hITH'LDT $SHV.LDT CALI.LDT SGR.LDT -999,250 '-999 250 -999 250 -999 250 -999,250 -999 250 -999 250 -999 ~50 -999 250 -999 250 201. 686 210 738 195 5 73 I57 687 525 600 '25 500 0 ~50 6395 00 o o~ 132~, 9~,146 ,a546 83;471 t63,746 I ,944 6395,000 738i864 576 15~ 072 . 596 56 O0 ~ 149 620¢ 000 8373 O. 020 133 6i2 1329 456 8 442 26 534 IS Tape Verification Listin.c chlumberger Alaska Computing Center !4"AUG-1991 09:O8 CGR.LDT HTEN,LDT TNRA,CNL CNTC:~NL CALI NL H~EN'CNL POTA NGT W3NG:NGT MTEN.NGT DEPT,.. 'DTE ]IXD,DTE 8P,DTE MR~S.DTE T 2.BHC Gg'BHC HTEN,BHC ~TEM.GP! HDIA'GPI ~NO~.GPI DRHO.LDT LS,LDT SSt,LDT SIRH,LDT RB.LDT CGR LDT HTEN 5DT TNRA CNL CNTC CNL CALI CN5 HTEN'CNL POTA,NGT W3NG.NGT MTE~.NGT DEPT, IMPH.DTE IL~ DTE IIXD.DTE SP.DTE ~RE$.DTE TT~.BHC G~,BHC HTE~.BHC ~TE~,GPI HDIa.GPI DRHO,LDT bS,LDT SS{,LDT ${RH.LDT R~.LDT CGg.LDT {0 661 148 2 635 3158 797 8 442 66! !48 0 23O 12 494 164 12908.000 2 237 ~9 5O9 5 {05 -90 438 0:150 391 600 29 071 566 853 163 722 9 684 3 543 0 000 356 455 204:160 2 265 178 954 20 339 68~,932 ,593 3196.7~0 8.442 68~,932 13 ,493 ,929 163,722 508 2 802 120~ 23 Aoo 534 2 O68 4325 0 146 TENS'LDT NPHI'CNL NPOR'CN5 c~!~,cD5 TEN~,CNL SGR~NGT URAN,NGT W4NG,NGT MRES'NGT CIDP~DTE CILD.,DTE IDQF.,DT~ IIRM'DTE GR'DTE HTEN, DTE TT3,.BHC TENS'B~C MRES'GPI RB~GPI ~INV,GPI PEF,LDT LU,SDT SS2~'LDT 5SRH.SDT HAZI.LDT TEN NPHI CNL NPOR :CNL CFTC :CNL TENS CNL SG~ NGT URAN NGT W4NG NGT MRES.NGT CIDP,DTE CILD.DT£ IDQF,DTE IIRM.DTE GR*DTE H~EN,DTE TT3,BHC TEN$.BHC SGR.GPI MRES. GPI RB.GPI MINV.GPI PEF*LDT LU,LDT SS2,LDT LSRH,LDT ~AZI.LDT TENS.LDT ,171 0,000 8.693 9,071 566,853 000 30 474 0 1.46 1:78 954 2 740 32~ 6~5 787 287 386 775 000 !263 688 SO000 6030 474 1 342 3 362 0 146 MTEM bDT RTNR CNL RCNT CNG SGR CNL MRES CNL CGR NGT WlNG NGT W5NG~NGT CS*NOT IDPH DTE ILO DTE I~Or DTE IIXN =DTE TENS.~DTE TT4~BHC NT~.;OHC CR.,OPI HTEN..GPI 'LA.,;GPI DPH~.,SDT QL~ GDT Lb bDT 5$HV ,LDT MTEM BDT ~TNR CNL RCN'~.CNL SGR~CNL MRES CNL CGR,NGT WING NOT WSN~ NGT CS NOT 12800,000 27,376 IDPH,DTE 20,750 29,381 ILD,~DTE 18,686 0 000 IMOF~DTE 3,740 50:829 IIX~,DTE -23,563 31.~83 TENS,DTE 0,151 598, 89 DT,BHC 388.000 550~200 TT4,BNC 31,383 5705,000 MTE~'BNC 598,289 36.940 CG.R~GPI 161,304 0.~47 HTEN,GPI 9.868 181,892 LAeGP! 3,640 2.983 DPHI,LDT '0,010 2,589 OLS,LDT 228.667 223~920 LL,LDT 184.633 256,580 LSHV,LDT 2 563 2 524 LURH,LDT 1811892 61i529 PlAZ,SDT 43.302 6255 000 MTEM,LDT PAGE: I1 164.319 ~RES LDT 2.765 TNPH CNL 3!85..180 RCFT CNL 26.534 CGR CNL 0.146 MTEM CNL 10'451 THOR NGT 92~744 W2NG NGT 4,.325 TENS NGT 842.328 HTEN NGT 40 045 CI~P,DTE 35 498 CILM DTE 0 000 IIRD DTE 8 .326 SFLU DTE 5685 000 ~TEM DTE 85 .850 TTI BHC 386 400 SP BHC {57 624 ~RES BHC 20,.,339 TENS GPI 682 ~32 CALI GPI 8 381 SA GPI 23 255 RHOB LDT 0 007 OSS bDT 1,92 :061 LITH LDT 1446 250 SSH¥ LDT 2 282 CALI LDT 24~'653 SGR LDT ~722 ~RES LDT 162'678 TNPH CNL 3287,306 RCFT CNL 30.,474 CGR CNL 0.146 MTEM CNL .339 2'0 THOR,NGT 94,140 W2NGiNGT 3,842 TENSeNGT 846,473 HTEN,NGT 36,528 CIMP.DTE 34.036 CILM'DTE 0,000 IIRD.DTE -4,~72 SFLU~DTE 5705.000 MTEM,DTE 85.300 TTI'BHC 380.800 SP,BHC 155'754 ~RES,BHC 43.302 TENS'GPI 709.738 CALI-GP! 8.55~ SA.GPI 8.225 RHOB.LDT -0.010 OSS LDT 116 707 5ITH:LDT 1446' 2.997 SSHV.LDT .535 CALI,LDT 243,558 SGR.LDT 161,.304 ~RES.LDT .. 0 146 28 6 1.0 ~ 1 164, ~9 787' 6200 000 661148 49, !4 24,995 157,,624 ~63.,200 90.1438 6080 0 8 442 2 6 0033 1~7604 ~329 750 8 442 30 474 2~ 146 554 1186 827 20.339 163 722 4~ 290 472 6080 000 682 932 48.194 53517 27 244 25 416 155 754 551 2OO -2~ 563 151 6255 000 8 512 i 374 2 514 0 OO5 52 590 1329 862 8 512 36 940 0 147 IS' ?aDe Yerlflcatlon Listing chlumLerger AlasKa Computtnq Center 14-AUG-1991 09:08 PAGE~ 12 HTEN.LDT TNRA'CML CNTC.CNL CALI,CML HTEN.CNL POTA.NGT W3N~.NGT NTE~.NGT DEPT.. i~ 'DTE .DTE IIXD,DTE SP.DTE ~RES DTE TT~ BHC GR BHC HTEN BHC MTE~ GPI HDIA.GPI MNOR,GPI DRHO,LDT L$.LDT SS1,LDT $1RH,LDT RB bDT CGR bDT HTEN bDT TMR~ CML CMTC CNL CALI CNL HTEN..CNL POTA NGT W3~iNGT MTE~ NGT DEPT. IMPH..DTE ILM.DTE IIXD.DTE SP.DTE MRES,DTE TT2.BHC GR.BHC HTEN.BHC MTE~.GPI HDIA.GPI MNO~.GPI DRHO.LDT L$.LDT $S~.LDT $1R~.LDT RB.LDT CG~.LDT HTEM.LDT 709,738 2 2 73i 963 011 8 5t2 709 738 0 698 13 903 161 304 12700,000 1950,000 1950,000 43!,996 -50~563 o 287 60O 63 803 585 610 158 072 I0 137 0 000 '0 875 130 256 54 528 4 8t5 145 486 59 ~!4 795 01 3 545 1587 946 8 650 795 501 1.791 35,543 158,006 12633 500 -999 25O -999 250 -999 250 -999 250 -999 250 -999,250 -999,250 -999,250 -999 25O -999:250 -999,250 -999.250 -999 250 '999i250 -999.250 -999,250 -999,250 -999.250 ~PHI,CNL 29,862 NPOR'CNL 32,524 CFTC*CNL 1106.317 TEN$2CNL 625~i000 SG..~,NGT 3 ,940 URAN~NGT 0,500 W4NG,NGT 5,46~ ~RE$.NGT 0,147 ClDPiDTE CILD. DTE IDOF, DTE IIRM~DTE GR~DTE HTEN. DTE TT3, BHC TEN$.BHC SGR~GPX MRE$.GPI MINV GPI PEF bDT LULDT SS~ LDT LSRH.LDT ~Z~,5~T TEN$.,LDT NPHI'CNL NPOR.2CNL CFTC,CNL TENS,.CN5 S~R.NGT URAN.NGT W4NG.NGT MRES"NGT CIDP'DTE CILD.DTE IDQF~DTE IIRM,DTE GR.DTE HTEN,DTE TT3,BHC TENS.BHC SGR.GPI MRE$.GPI RB.GPI MINV..GPI PEF,LDT LU,LDT S$2,LDT bSRH.LDT HAZI.GDT TENS.bDT NPHI.CNL 0 63, 3 585.~0 426,600 5635, O0 1,45 486 0000 ~40 94 797 2 9O8 6~84 186 75 000 4380 41 000 77025 40! 0 "999~ 50 '999~50 '999 250 -999~250 -999250 -999250 -999 250 -999 250 '999 250 '999 250 '999 250 '999 250 '999 250 '999 250 -999 250 -999 250 -999 250 -999 250 RTNR.CNb RCNT..CNL SGR,CNh MRE$, CNb CG~, WING,NG~ WLNG*N~T CS, NGT DTE .DTE DTE DTE DTE BHC bDT bDT bDT ~DT P M ,DT R CNb R CNL ~ CNL ( W~ NGT NGT NGT 'X:]~D, DTE XM~F~DTE TE] S,DTE ,) ,T.BHC T~ '4,BHC MT~ :M · BHC C! :R,GPI HTEN,GPI D ~A,GPI PHI,bDT bb, bDT LS~V,LDT bUWH, bDT PiAZ,5DT MTEM,LDT RTNR.CNb 2 98! TNPH 28~ :730 RCFT 940 CGR 0 147 MTE~ 43 302 THOR 103 277 W2NG 6455 TENS 902,984 HTEN ,tNb .CNL .CML *NGT .NGT ,NGT .NGT 3,689 CIMP..DTE 3'327 CILM.DTE  0~000 IIRD DTE .921 SFLU DTE '000 MTE~ DTE ,BHC ~BHC ~BHC ,GPX ~PX bDT bDT bDT bDT 148 ~TEM CNL 31-4 TMOR.NGT 272 W2NG,NGT !65 TENS.NGT ~38 HTEN,N~T 1545 5635 63.600 83,600 ~53.570 59~314 795i,501 8,,833 37,~396 0:031 62~636 14411 328 t58 3 1668 77 0 59 2~? MRES TENS RHOB. 615 SSHV 963 CALI 595 SGR 006 MRES 606 TNPH 079 RCFT 025 CGR -999:250 CIMP,DTE -999250 -999 250 IIRD,DTE -999:250 SFLU-DTE -999 ~.250 MTEM,DTE -999.250 TT1,BHC -999 250 SP.BHC -999 250 MRES,BHC -999 250 TENS,GP! -999.250 CALIiGP! :999.250 SA.GP! .999,250 RHOB,bDT 999,250 ~SSeLDT :999.250 LITH,LDT .999'250 SSHV.LDT 999.250 CALl,bDT -999,250 SGR*LDT -999.250 MRE$,.LDT -999.250 TNPH.CNL 1046 02 43 302 304 57 100 6255,000 709 738 -564.,640 -56~,562 67.472 9700.000 153 570 426 ,600 :-50 563 0 :~00 6375 8 615 ~'268 7 ;025 ~8 8~1'4 120,,5~7 .-999 250 -999250 ~999 250 "999 250 '999 250 "999 250 '999250 '999 250 '999 250 '999 250 '999 250 '999 250 '999 250 '999250 -999 250 -999,250 '999~250 -999250 -999 250 :hlUmi..erger. lasKa Computing Center TNRA'CNL -999.250 NPOR*CNL ~999.250 RCNT.CNb -.999.250 RCFT.CNL CNTC.C.L -999..250 C~TC. CNL ..999.250 SGR,CNL 99'~250 CGR*CNL CALI.CNL -999.250 TEN&.CNL -'999,250 MRES,CNL -999,250 ~TEM'CNL HTEN.CNL -999'250 SGR,NGT -999,250 CGR,NGT -999,~250 THOR.NGT POTA~NGT -999.250 URAN,NGT -999,250 W1N~..NGT ~999"250 W2NG.NGT W3NG,NGT -999.250 W4NG.~NGT -999,~50 W5NG,NGT -999~.250 TENS~NGT MTE~.NGT -999.250 MRE&~NGT -999'250 CS.NGT -999,250 HTEN.NGT END OF DATA -999,250 -999 250 '~999:250 -999'250 -999,250 -99 ,250 FILE NAME ~ EDIT .00~ SERVICE ~ F~IC VERSION ~ O0~A06 DATE : 91/00/~4 MAX REC SIZE : 1024 FILE TYPE L~ST FILE **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 91/05/~4 O~IGIN : FbIC TAPE NAME . ~ 74807 CONTINUATION # ~ ~ ' PREVIOUS TAPE : COMMENT ) B.P, EXPLORATION INC,,POINT MCINTYRE,POINT MCINTyRE #13,50-029~2~ **** REEL TRAILER *~** SERVICE NAME : EDIT DATE : 91/00/14 ORIGIN : FLIC REEL NA~E ~ 74007 CONTINUATION # ) PREVIOUS REEL : COMMENT : B,P, EXPLORATION INC,,POINT MCINTYRE,POINT MCINTYRE #~3,50-029-2~