Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout191-115STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________PRUDHOE BAY UNIT 05-30 JBR 07/18/2025 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:3 4" & 4-1/2" joints. Lower Kelly, HCR Kill & Choke FP. All three greased/cycled for a pass. Test Results TEST DATA Rig Rep:Vanhoose/LarsonOperator:Hilcorp North Slope, LLC Operator Rep:Montague/Yearout Rig Owner/Rig No.:Hilcorp Innovation PTD#:1911150 DATE:5/9/2025 Type Operation:WRKOV Annular: 250/3500Type Test:INIT Valves: 250/3500 Rams: 250/3500 Test Pressures:Inspection No:bopSAM250511130943 Inspector Austin McLeod Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 6 MASP: 2499 Sundry No: 325-110 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 1 FP Ball Type 1 P Inside BOP 1 P FSV Misc 0 NA 15 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 13-5/8"P #1 Rams 1 2-7/8"x5-1/2"P #2 Rams 1 Blinds P #3 Rams 0 NA #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 3-1/8"P HCR Valves 2 3-1/8"FP Kill Line Valves 2 3-1/8"P Check Valve 0 NA BOP Misc 0 NA System Pressure P3000 Pressure After Closure P1550 200 PSI Attained P23 Full Pressure Attained P90 Blind Switch Covers:PAll stations Bottle precharge P Nitgn Btls# &psi (avg)P6@2250 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 0 NA Annular Preventer P10 #1 Rams P9 #2 Rams P8 #3 Rams NA0 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P2 HCR Kill P2 9 9 9 9 9 9999 9 9 9 9HCR Valves 2 FP FP Lower Kelly HCR Kill & Choke FP 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 05-30 Install New Completion Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 191-115 50-029-22213-00-00 12000 Conductor Surface Liner Tieback Slotted Liner 8789 3460 9483 1824 8751 1236 11994 13-3/8" 9-5/8" 7" 7" x 4-1/2" x 3-1/2" 4-1/2" 8789 38 - 3498 37 - 9520 9206 - 11030 35 - 10757 10758 - 11994 38 - 3498 37 - 8351 8169 - 8805 35 - 8786 8786 - 8789 None 2260 4760 7020 7020 / 7500 / 10530 None 5020 6870 8160 8160 / 8430 / 10160 9402 - 11948 4-1/2" 12.6# 13Cr 32 - 8834 8283 - 8788 Structural 80 20" 38 - 118 38 - 118 1490 470 4-1/2" HES TNT Packer 8641 7770 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com 907-564-4672 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028326 32 - 7915 7' Scab liner from Surface to 8784'MD Pumped 250-bbls (1134 sks) of 15.3-ppg type I/II cement with final pressure 2846-psi. 1191 1101 32037 15587 871 1051 550 420 973 915 325-110 13b. Pools active after work:Prudhoe Oil No SSSV Installed 8641, 7770 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.06.16 16:36:36 - 08'00' Bo York (1248) By Grace Christianson at 7:42 am, Jun 17, 2025 JJL 6/30/25 RBDMS JSB 062725 DSR-6/18/25 ACTIVITY DATE SUMMARY 4/5/2025 *** WELL SI ON ARRIVAL (ELINE WELLTEC TUBING CUT) *** MIRU YJ ELINE PT PCE 300/3000 PSI, FUNCTION WLV. CORRELATE TO TUBING TALLY 1/27/2011 CUT WITH WELLTEC CUTTER. CCL OFFSET 18.3, CCL STOP 8869.0 FT, CUT DEPTH 8887.3 FT, ANCHORS AT 8877 FT. 750/450/O PSI BEFORE CUT, SAW PRESSURE CHANGE AFTER CUT, GOOD INDICATION, PUMPED ON IA, OBSERVED T X IA COMMUNICATION. RDMO YJ ELINE. WT REPORTS 4.80" EXTENSION ON CUT INDICATOR. *** WELL SI ON DEPARTURE (ELINE COMPLETE) *** 4/10/2025 T/I/O= 731/485/0 LRS Unit 76 (RWO EXPENSE) Pumped 4 BBLS 60/40 followed by 103 BBLS DeepKlean, followed by 308 bbls 9.8 brine down Tbg, taking returns from IA to OTT. Inside opent top leaking at the crossover into the tank. FP surface lines w/ 5 bbls 60/40 meth and wait for vac trucks to vac out outside open top. Pumped 412 bbls 9.8 brine and 4 bbls DSL down Tbg, Up IA to open top tank. Bull headed 16 bbls DSL down IA for DSL cap. Micro Motion had 9.75 ppg fluid to tanks at end of pump job. Freeze protected hardline and choke w/ 5 bbls 60/40 meth. DSO notified of well status per LRS departure. SV,WV,SSV=C MV=O IA,OA=OTG HL=SI 5/1/2025 T/I/O=Vac/0/0. Pre-RWO (I-Rig) , Set 4" TWC #444 , Performed LTT (Pass), Removed 4" Upper Tree and installed Temp valve #81 as Dryhole SV, Torqued to API specs. PT''d Dryhole Tree against TWC to 300/5000 (Pass). RDMO. Final WHP's TWC/0/0. ***Job Complete*** 5/2/2025 T/I/O=TWC/0/0. Pre RWO. Verified TWC LTT. Passed, Removed 4" CIW MV (ring groove pitted) and installed new 4" CIW FLS (tag #38) and Dryhole valve #81 as SV. Torqued flanges to spec. Pressure tested dryhole tree against TWC to 300/5000 psi. Passed. ***Job Complete*** Final WHP's TWC/0/0. 5/7/2025 RWO Scope: RDMO 06-12C staging mods at pad entrance. Mobilize rig moving from DS-06 to Halliburton shop For crew change. ***Cont. WSR on 5/8*** 5/8/2025 T/I/O = 0/Vac/0. Temp = SI. OA FL (I-rig request). OA FL (I-rig request). OA FL @ 80'. I-Rig in control of well upon departure. 20:15 5/8/2025 ***Cont. WSR from 5/7/25*** RWO Scope: Cont. to move rig from Halliburton shop to DS-05 MIRU over 05-30 Work on rig acceptance chekclist. Rig accepted at 00:00 hrs. ***Cont. WSR on 5/9/25*** 5/9/2025 T/I/O = 0/Vac/0. Temp = SI. OA FL (I-rig request). OA FL @ 80', unchanged. I-Rig in control of well upon departure. 02:30 5/9/2025 ***Cont. WSR from 5-8-25*** RWO Scope: Pull BPV, R/U and rock out diesel. Install BPV, N/D tree and inspect LDS and hanger threads N/U BOPE and test as per sundry. Test was witnessed by AOGCC rep Austin McLeod. R/D testing equipment and R/U Integra TRS ***Cont. WSR to 5-10-25*** Daily Report of Well Operations PBU 05-30 Daily Report of Well Operations PBU 05-30 5/9/2025 T/I/O=0/0/0 Pull 4" CIW H TWC, stand by for rig work, set 4" CIW H TWC, check tubing hanger void for psi (0), nipple down THA & dry hole tree, clean void & hanger threads, make up 4-1/2" TC-II test sub 8-1/2 RH, test 3500 psi., good test, bleed off, rig down test equip., function tubing hanger lock down screws one at a time (4-3/8" clear bowl), retorque to 500 ft/lbs, test fit 4-1/2" TC-II crossover 8-1/2 RH, GTG, remove XO, install new RX-54, get ULDS RKB (21.73'), RDMO Final T/I/O=0 5/10/2025 ***Cont. WSR from 5-9-25 RWO Scope: Pulled TWC, Pulled hanger to floor unseating at 125K L/D hanger, R/U and circ soap pill. POOH and L/D 4-1/2" TBG with multiple overpulls ranging from 60-125K. R/U Yellow Jacket E-line and RIH with Caliper ***Cont. WSR on 5-11-25*** 5/11/2025 ***Cont. WSR from 5-10-25*** POOH with Read Caliper tool at 50 FPM R/D E-Line and send off logs M/U taper mill cleanout BHA and single in the hole T/6781' milling through multiple deformed CSG areas. ***Cont. WSR on 5-12-29*** 5/12/2025 ***Cont. WSR from 5-11-25*** Cont. to single in the hole to top of TBG stump at 8893' tagging w/5K milling through 3 more deformation zones last being 7954' Pump Hi-vis sweep, back on time 10% increase POOH F/8893' T/415' cleaning up at 6527' & 5880' due to 10K overpulls L/D milling cleanout BHA, Tapered mill was 1/4" under, string mill was in gauge Flush stack getting 35 lbs of metal back. M/U 8-1/2" dress off BHA and RIH T/6780' ***Cont. WSR on 5-13-25 5/13/2025 ***Cont. WSR from 5-12-25 Cont. to RIH to TBG stump. Wash over 17' and dressed off stump Pump Hi-vis sweep, back on time with 10% increase POOH, L/D dress off BHA M/U Lower tie back run 1 w/overshot and SLZXP dumping 50' of sand on RBP. RIH T/5124' ***Cont. WSR on 5-14-25*** 5/14/2025 ***Cont. WSR from 5-13-25*** Cont. RIH w/Lower tie Back T/8907' Space out 1' off No-Go, Set and release from SLZXP LTP. POOH F/8784' T/2287' M/U storm packer, RIH and set at 108'. PT to 1200 psi N/D BOPE and old spool. N/U new 7" CSG spool and BOPE ***Cont. WSR or 5-15-25*** 5/14/2025 T/I/O= 0/0/0 N/D BOP, sting into IC and bleed psi to 0, monitor 15 mins and re check, N/D Casing head, clean up and change seals on packoff, install new casing head and torque, test IC pack off 5 min 500psi low (pass), 15 min 3500 high (pass), install test plug, RDMO End T/I/O= 0/0/0 Daily Report of Well Operations PBU 05-30 5/15/2025 ***Cont. WSR from 5-14-25*** Cont. N/U BOPE R/U and pressure test all breaks Blinds failed during test, trouble shoot ram issues. Slit stack apart and prep to change out Double gates. ***Cont. WSR on 5-16-25 5/16/2025 ***Cont. WSR from 5-15-25 Cont. splitting stack apart. Swap out double gates with new. Put stack back together and N/U on well. Rig up and test BOPE as per sundry. Witness waived by AOGCC rep Kam St.John M/U running tool and engage in storm packer. ***Cont. WSR on 5-17-25*** 5/17/2025 ***Cont. WSR from 5-16-25*** Pull storm packer to surface and L/D Slip and cut drilling line. Service rig POOH F/2287' T/surface L/D liner running tool. Close blinds and change UPR to 7" test same. Test witness waived by AOGCC Kam StJohn R/U TRS and RIH with 7" tie back w/bullet seals F/surface T/8602' ***Cont. WSR on 5-18-25*** 5/18/2025 ***Cont. WSR from 5-17-25*** Cont. RIH with 7" tie back T/8793' tagging No-Go with 5K Perform space out landing out 2.41' off No-Go. Seal nose at 8790.59' R/U Volant tool and break circulation. R/U CMTR's and perform CMT job. Pumped 250-bbls (1134 sks) of 15.3-ppg type I/II cement with final pressure 2846-psi. 30 bbls spacer and 23 bbls green CMT to surface. N/D BOPE and Install New TBG spool. N/U BOPE, Change UPR's and test with 4" & 4.5" test jts. M/U cleanout BHA and RIH T/3214' ***Cont. WSR on 5-19-25*** 5/18/2025 T/I/O= 0/0/0 P/U 7" mandrel tie back hanger and M/U to string, 5' hanger in hole, hanger landed @21.64 as per RKB, P/U hanger 7', S/B for cement job, re land hanger and R/I LDS (3-3/4" IN), B/O L/J and L/D, RIH with 6" J-BPV, S/B for N/D, install new tubing head and torque, psi up to 50 for 5 min low, 3500 high for 15 mins (pass), pull 6" J-BPV, RDMO End T/I/O= 0/0/0 Daily Report of Well Operations PBU 05-30 5/19/2025 ***Cont. WSR from 5-18-25*** Cont. RIH F/3214' T/8649' washing down last std. R/U and PT 7" CSG to 3500 PSI Wash and ream F/8649' T/8689' tagging cement Drill up Cement and float collar F/8689' T/8733' and wash down T/8850' Pump sweep, POOH and L/D cleanout BHA M/U RCJB BHA and RIH T/8849. Pump ball on seat and washing down to top of RBP at 8864'. Pump sweep, POOH T/7322' ***Cont. WSR on 5-20-25*** 5/20/2025 ***Cont. WSR from 5-19-25*** Cont. POOH F/7322' and L/D RCJB BHA. RCJB was empty Serviced rig M/U BP retrieval tool and RIH to top of Plug @ 8864' Displace well over to seawater. Latch onto BP and POOH L/D 4" DP. R/U and RIH w/4.5" 12.6#, 13Cr VT tubing T/3081' ***Cont. WSR on 5-21-25*** 5/21/2025 Run and land completion, reverse circ CI seawater, set packer and MIT tubing and IA to 3500 psi for 30 min, Shear out SOV. Jet BOP¿s and N/D same, N/U tree and test tree and void to 5000 psi, Freeze protect well, Prep for rig move 5/21/2025 LRS 46. Assist I-Rig (RWO EXPENSE) Pumped 88 bbls Diesel into IA for FP. DSO notified upon LRS departure. 5/21/2025 T/I/O= 0/0/0 P/u 4" tubing hanger and M/U to string, land tubing hanger as per RKB (19.64'), R/I LDS (3-3/4"), torque GNs and LDS to 450 ft/lbs, S/B for pumping, install 4" H style BPV, S/B for N/D, Clean up hanger top and neck, fill void with hydraulic fluid, install SBMS seal in top of hanger neck, install new BX160 ring gasket, P/U tree and land, torque up tree and THA, test hanger-THA void 500 psi low for 5 mins (pass), test to 5000 psi high for 15 mins (pass), bleed test psi, remove 4" H style BPV and install 4" H style TWC, fill tree with water and test DH tree to 5000 psi for 15 mins (pass), bleed test psi, remove TWC and secure tree, RDMO End T/I/O= 0/0/0 5/23/2025 T/I/O = 0/0/0. Post I-Rig. Removed temp valve #38 from Dry Hole configuration and installed 4" CIW Production tree. Torqued to API specs. PT'd against MV 300/5000. Passed. Installed production piping and wellhouse. RDMO. Final WHP's = SI/0/0. ***Job Complete*** 5/23/2025 ***WELL S/I ON ARRIVAL*** SET WHIDDON CATCHER SUB @ 8752'SLM PULLED BK-DGLV FROM ST#2 @ 5931'MD PULLED BEK-SOV FROM ST#3 @ 3587'MD SET BK-LGLV(16/64'' 1500psi) IN ST#3 @ 3587'MD SET BK-OGLV(20/64'') IN ST#2 @ 5931'MD PULLED WCS FROM 8745'SLM PULLED RHC FROM NIPPLE @ 8757' MD *** WSR CONT ON 5/24 *** Daily Report of Well Operations PBU 05-30 5/24/2025 *** WSR CONT FROM 5/23 *** MADE 5 RUNS w/ 2-1/2" PUMP BAILER TO TOP OF JUNK BASKET @ 9055' MD(recovered aprox 5gal fill) PULLED 4-1/2'' JUNK BASKET FROM 9060'SLM PULLED P-PRONG FROM PLUG BODY @ 9071'SLM PULLED 4-1/2'' PXN-PLUG BODY FROM XN-NIP @ 9067'MD ***WELL LEFT S/I ON DEPARTURE*** CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Rixse, Melvin G (OGC) To:Jerry Lau; Lau, Jack J (OGC) Cc:David Bjork; James Lott - (C); Regg, James B (OGC); DOA AOGCC Prudhoe Bay Subject:20250515 1647 APPROVAL - PBU 05-30 (PTD: 191-115) BOP configuration change Date:Thursday, May 15, 2025 4:50:12 PM Attachments:image001.png Jerry, Approved to swap blind rams with variable rams on PTD 191-115 as long as all low and high pressure tests are passing and the proper witness notifications were made. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). cc. Jim Regg and AOGCC Inspectors From: Jerry Lau <Jerry.Lau@hilcorp.com> Sent: Thursday, May 15, 2025 11:21 AM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>; Lau, Jack J (OGC) <jack.lau@alaska.gov> Cc: David Bjork <David.Bjork@hilcorp.com>; James Lott - (C) <jlott@hilcorp.com> Subject: PBU 05-30 (PTD: 191-115) BOP configuration change Mel/Jack, I’m covering for the I-rig 05-30 RWO. We are currently troubleshooting a failed low PT on the blind rams. We changed the seals and failed low PT again. We want to swap the variable and blinds to check whether the cavities or ram seals are the culprit. Then we would just leave the configuration in place and carry on. Configurations Top down: Current: Annular, Variable, Blind Proposed: Annular, Blind, Variable Please review and let me know if you have any questions or concerns Jerry Lau Hilcorp North Slope – Prudhoe Bay East FS3 Operations Engineer (DS 06,07,13,14,15) Cell: (907) 360-6233 Office: (907) 564-5280 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notifiedthat any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility isaccepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 05-30 Install new completion Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 191-115 50-029-22213-00-00 ADL 0028326 12000 Conductor Surface Intermediate Production Liner 8789 80 3460 9494 11994 20" 13-3/8" 9-5/8" 8789 38 - 118 38 - 3498 37 - 9531 2499 38 - 118 38 - 3498 37 - 8357 none 470 2260 4760 none 1490 5020 6870 9402 - 11949 3-1/2" 9.2# 13Cr80 9115 - 107578283 - 8788 Structural 4-1/2" HES TNT Perm , 3-1/2" BAKER MODEL D No SSSV 8963 , 9145 8012 , 8133 Date: Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY 6/15/2025 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov 325-110 By Gavin Gluyas at 8:49 am, Feb 28, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.02.27 15:06:14 - 09'00' Bo York (1248) JJL 3/17/25 SFD 3/26/2025 10-404 X DSR-2/28/25 AOGCC Witnessed BOP test to 3500 psi, Annular to 3000 psi. *&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.03.26 16:51:05 -08'00'03/26/25 RBDMS JSB 032725 RWO 05-30 PTD:191115 Well Name:05-30 API Number:500292221300 Current Status:Shut-In Rig:Hilcorp Innovation Estimated Start Date:06/15/2025 Estimated Duration:14 days Reg.Approval Req’std?10-403, 404 Date Reg. Approval Rec’vd:N/A Regulatory Contact:Carrie Janowski Permit to Drill Number:191115 First Call Engineer:Dave Bjork 907-564-4672 907-440-0331 Second Call Engineer:Jerry Lau 907-564-5280 907-360-6233 Current Bottom Hole Pressure:3,379 psi @ 8,800’ TVD 7.4 PPGE | calc from shut in WHP Max. Anticipated Surface Pressure:2,499 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:1,950 psi (Taken on 12/26/24) Min ID:1.81” ID ‘Sag Straddle’ @ 9,392’-9,444’ MD Max Angle:93 Deg @ 11,249’ Brief Well Summary: 05-30 was drilled in October 1991 and completed as a Z1A producer with a slotted liner. The tubing was swapped in 2011. In 2017 Sag river perfs were added and comingled with Z1A. By 2019 the well was high GOR. A LDL found a PC leak at 5,507’ with a LLR of 2.7bpm at 2,350-psi. In 2021 the tubing passed an MIT-T to 2,500- psi. The Sag river perfs were patched and the well Pop’d under a 60 day eval period. The well flowed at 800- 900 IOR during the eval time. We will now pursue a RWO to repair the PC leak. We will install a fully cemented 7” longstring then run a 4-1/2” chrome gas lifted completion. The well is currently secured with a PX plug in the packer tailpipe. Objective: Pull 4-½” tubing out of the well. Set lower tieback. Run 7” longstring and cement to surface. Add tubing spool. Drill-out shoe tract, pull RBP. Run new 4-½” 13Cr gas lifted completion. Achieve a passing MIT-IA & MIT-T. Pre RWO work: DHD – MIT-T – 2,500-psi Cycle LDS’s PPPOT-T – 5,000-psi E-line - Cut tubing at 8,889ft (10ft down on first full joint of tubing) Fullbore Circ out wellbore with 9.8ppg brine and diesel cap. Valve Shop – Set and test 4-1/16 H CTS plug Pull wellhouse and flow line. RWO 05-30 PTD:191115 Proposed RWO Procedure: 1. MIRU Hilcorp Innovation Rig. 2. ND Tree and NU 11” x 13-5/8” adapter, 13-5/8” BOPE with three preventers configured top down (annular, 2-7/8” x 5-1/2” VBR’s, blinds, mud cross). 3. Test BOPE to 250psi Low/3,500psi High, annular to 250psi Low/3,000psi High (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. A. Perform Test per Hilcorp Innovation BOP test procedure. B. Notify AOGCC 24 hrs in advance of BOP test. C. Confirm test pressures per the Sundry Conditions of approval. D. Test the 2-7/8” x 5-1/2” VBR’s with 4” and 4-1/2” test joint. Test the Annular preventer with a 4” test joint. E. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 4. Pull TWC. 5. MU landing joint or spear, BOLDS and pull hanger to the floor. PU weights are expected to be ~125K 6. Pull 4-1/2” tubing to floor, circulate bottoms up. LD 4-1/2” tubing. 7. PU 4” DP with lower tieback assembly and 4-1/2” overshot and pre-installed 7” RBP. Set liner top packer. 8. POOH with 4” DP and set 9-5/8” storm packer. Test to 1,000-psi. 9. Set back BOP, pull 11” x 13-5/8” adapter. ND 13-5/8” x 11” tubing spool, Install 13-5/8” spool for 7” tieback. NU BOP and 13-5/8” spacer spool. 10. PPPOT-IC to 3,500-psi and Test BOP breaks to 3,500-psi. 11. Pull Storm packer and stand back remaining DP. 12. Swap to upper RAMs to 7” fixed and test to 3,500-psi. 13. Run 7” 26# L-80 VamTop tieback. Space-out and fully cement with 15.3 ppg Class G. 14. Swap upper Rams from 7” fixed to 2-7/8” x 5-1/2” VBRS and test with 4” and 4-1/2” test joints. 15. ND BOP and 13-5/8” Spacer spool, NU new 13-5/8” tubing spool. NU BOP and test breaks to 3,500-psi 16. Test long string to 3,500-psi. 17. RIH with drill-out assembly on 4” DP. Drill up shoe tract. Swap well to seawater. POOH and SBDP. 18. RIH with RBP retrieving tool. Pull RBP and LDDP. 19. Run 4-1/2” 12.6# 13Cr VamTop gas lifted completion as detailed on proposed schematic. 20. Land tubing hanger. 21. Reverse in corrosion inhibited 8.6 ppg brine. 22. Drop ball-n-rod and set packer. Perform MIT-T to 3,500 psi and MIT-IA to 3,500 psi for 30 charted minutes. Shear valve and U tube diesel FP. 23. Set TWC 24. ND BOPE and NU 4-1/16 tree and adapter. 25. Test the tree and adapter void to 5,000-psi. 26. Rig down Hilcorp Innovation. Post Rig Work 1. Pull TWC. Set generic KO design. Pull Ball and rod and RHC profile, pull junk catcher and PX plug. 2. Reconnect flowline and set wellhouse. RWO 05-30 PTD:191115 Attachments: 1. Wellbore Schematic 2. Proposed Wellbore Schematic 3. BOP Drawing 4. Change of Approved Sundry Form RWO 05-30 PTD:191115 Wellbore Schematic RWO 05-30 PTD:191115 Proposed Wellbore Schematic - New production packer ~ 8750' - 8802' Top of SLZXP Tie back cemented to surface with 20bbls excess. Cased hole volume 225.3bbls with a shoe tract of ~ .5bbl. Total planned cement volume 250 bbls. RWO 05-30 PTD:191115 Innovation Rig BOPs Innovation Rig Choke Manifold RWO 05-30 PTD:191115 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date David Douglas Hilcorp Alaska, LLC Sr. GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: Date: 02/19/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL Well: PBU 05-30 PTD: 191-115 API: 50-029-22213-00-00 Definitive Directional Survey -Definitive Directional Survey 07/26/2010 Main Folder Contents: Please include current contact information if different from above. 191-115 T40099 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.02.19 15:04:48 -09'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 05-30 Install Straddle Patch Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 191-115 50-029-22213-00-00 12000 Conductor Surface Intermediate Production Liner 8789 80 3460 9494 11994 20" 13-3/8" 9-5/8" 8789 38 - 118 38 - 3498 37 - 9531 38 - 118 38 - 3498 37 - 8357 none 470 2260 4760 none 1490 5020 6870 9402 - 11949 3-1/2" 9.2# 13Cr80 9115 - 10757 8283 - 8788 Structural 4-1/2" HES TNT Perm , 8963 , 8012 No SSSV 8963 , 9145 8012 , 8133 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028326 8115 - 8786 555 422 61732 44327 44 233 0 0 1127 1051 N/A 13b. Pools active after work:PRUDHOE OIL 3 1/2" BAKER MODEL D , 9145 , 8133 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:21 pm, Jan 24, 2025 Digitally signed by David Bjork (3888) DN: cn=David Bjork (3888) Date: 2025.01.24 11:44:06 - 09'00' David Bjork (3888) RBDMS JSB 013025 DSR-1/31/25 Production A.Dewhurst 04MAR25 Liner WCB 2-11-2025 ACTIVITYDATE SUMMARY 12/19/2024 ***WELL S/I ON ARRIVAL*** PULLED 4-1/2" PX PRONG & PLUG BODY FROM 8,997' MD RAN 30' x 2.73" MONOPAK DRIFT TO 9500' MD (NO ISSUES). ***WELL S/I ON DEPARTURE*** 12/22/2024 ***WELL S/I ON ARRIVAL*** (PATCH-IN PROGRESS) MIRU YELLOWJACKET E-LINE PT PCE 300 PSI LOW /3000 PSI HIGH, FUNCTION TEST WLVS CORRELATED TO SCHLUMBERGER PERFORATION RECORD DATED 24-MAY- 2017 SET NS LOWER PATCH AT 9439' CCL TO MID ELEMENT = 28.1' CCL STOP DEPTH = 9410.9' SAT DOWN AFTER SET BOTTOM OF PACKER AT 9444', SNAP LATCH RECEPTACLE AT 9423'. RDMO YELLOWJACKET ELINE **WELL S/I ON DEPARTURE*** READY FOR SLICKLINE 12/26/2024 Assist Slickline ( PATCH TUBING / LINER ) Pumped 2 bbls 60/40 meth and 140 bbls 180* DSl down Tbg. Pumped 70 bbls 40* DSL at 5 bpm to free up SL. SL in control of wel per LRS departure. IA,OA=OTG 12/26/2024 ***WELL S/I ON ARRIVAL*** SET NS 350 MONO-PAK STRADDLE PATCH @ 9423' MD ***WELL LEF S/I ON DEPARTURE*** Daily Report of Well Operations PBU 05-30 BOTTOM OF PACKER AT 9444',SNAP LATCH RECEPTACLE AT 9423'. From:Rixse, Melvin G (OGC) To:Oliver Sternicki Cc:David Bjork; Lau, Jack J (OGC) Subject:20241209 0924 APPROVAL 05-30 (PTD# 191115) request to POP under eval with PC leak for up to 60 days Date:Monday, December 9, 2024 9:24:50 AM Oliver, Hilcorp is still approved for the original 60 days of flow under evaluation for PBU 05- 30 if the original approval to POP was not initiated. Please copy Jack Lau in the future as we he will be transitioning to be the primary AOGCC engineering contact for PBU Sundries and approvals. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). cc. Bjork, Lau From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Sent: Friday, December 6, 2024 1:46 PM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Cc: David Bjork <David.Bjork@hilcorp.com> Subject: RE: [EXTERNAL] RE: 05-30 (PTD# 191115) request to POP under eval with PC leak for up to 60 days Mel, The work to POP 05-30 under evaluation this summer got pushed down the prioritization list, but operations is again interested in making space for it. Since it is 6 months since your original approval I wanted to circle back with you and make sure you are still good with this work. Nothing has changed with the well, this is just a courtesy to make sure we are all still aligned. Thanks, Oliver Sternicki Hilcorp Alaska, Hilcorp North Slope LLC CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. Well Integrity Supervisor Office: (907) 564 4891 Cell: (907) 350 0759 Oliver.Sternicki@hilcorp.com From: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Sent: Monday, May 6, 2024 3:23 PM To: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Subject: [EXTERNAL] RE: 05-30 (PTD# 191115) request to POP under eval with PC leak for up to 60 days Oliver, Hilcorp is approved to flow test from the Ivishak without gas lift for 60 days. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Sent: Monday, May 6, 2024 10:33 AM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: 05-30 (PTD# 191115) request to POP under eval with PC leak for up to 60 days Mel, 05-30 (PTD# 191115) is a Sag/ Ivishak producer that was made not operable on 11/26/2019 after failing a CMIT-TxIA during CTD screening. A subsequent LDL on 11/30/2019 found a PC leak at 5540’ MD. In 2021 the well was flowed under eval for 60 days to determine if well production would support repair of the PC leak, but the well was not found to be economic. The current plan is to patch over the Sag perforations at 9402-9433’ MD and flow the well just from the Ivishak slotted liner to determine if production rates are sufficient for the repair work. A MIT-T passed on 5/6/2024 to 2595 psi with a plug set in the tubing at 8997’ MD. Hilcorp requests permission to flow the well under eval for up to 60 days to evaluate production rates for well economics to support repair of the production casing. Gas lift will not be used, dummy gas lift valves are set. The IAP will be maintained below MOASP and the well resecured at the end of the under eval period. Regards, Oliver Sternicki Hilcorp Alaska, Hilcorp North Slope LLC Well Integrity Supervisor Office: (907) 564 4891 Cell: (907) 350 0759 Oliver.Sternicki@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Kyle Wiseman Hilcorp Alaska, LLC Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: Kyle.Wiseman@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 01/11/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20230111 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# PBU 05-30 50029222130000 191115 1/2/2023 HALLIBURTON RMT3D PBU 15-07D 50029211660400 215158 12/29/2022 HALLIBURTON RMT3D PBU K-20C 50029225550300 208049 1/2/2023 HALLIBURTON RBT PBU L1-13 50029235630000 216003 1/4/2023 HALLIBURTON RMT3D PBU Z-223 50029237200000 222080 12/22/2022 HALLIBURTON WFL-TMD3D-RMT3D PBU L-112 50029231290000 202229 1/6/2023 READ MemoryRadialCementBondLog Please include current contact information if different from above. By Meredith Guhl at 3:24 pm, Jan 11, 2023 T37435 T37436 T37437 T37438 T37439 T37440 PBU 05-30 50029222130000 191115 1/2/2023 HALLIBURTON RMT3D Meredith Guhl Digitally signed by Meredith Guhl Date: 2023.01.11 15:32:54 -09'00' Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:191-115 6.50-029-22213-00-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12000 11994 8789 8973 , 9145 none none 8019 , 8133 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 38 - 118 38 - 118 1490 470 Surface 3460 13-3/8" 38 - 3498 38 - 3498 5020 2260 Intermediate 9494 9-5/8" 37 - 9531 37 - 8357 6870 4760 Liner 1824 7" 9206 - 11030 8169 - 8805 8160 7020 Perforation Depth: Measured depth: 9402 - 11949 feet True vertical depth:8283 - 8788 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# x 3-1/2" 9.2# 13Cr85 / 13Cr80 34 - 10757 / 34 - 8786 8973 , 9145 8019 , 8133Packers and SSSV (type, measured and true vertical depth) 4-1/2 HES TNT, 3-1/2" Baker D Liner 1236 4-1/2" 10758 - 11994 8786 - 8789 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 1019042334 3558329 0 37251 743 1168 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Dave Bjork David.Bjork@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907) 564-4672 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8789 Sundry Number or N/A if C.O. Exempt: n/a no SSSV Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … pull plug in zone Operations shutdown … Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028326 PBU 05-30 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 9:21 am, Mar 04, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.03.04 07:13:29 -09'00' Bo York MGR12MAR2021 DSR-3/4/21 RBDMS HEW 3/4/2021 SFD 3/8/2021 ACTIVITYDATE SUMMARY 2/15/2021 ***WELL S/I ON ARRIVAL*** (Secure well) PULL P-PRONG FROM 4-1/2" PX PLUG BODY AT 8,997' MD. ***LDFN, WELL S/I & SECURED, CONTINUED ON 2/16/21*** 2/16/2021 ***CONTINUED FROM 2/15/21 WSR*** (Secure well) PULL 4-1/2" PX PLUG BODY FROM 8,969' SLM / 8,997' MD. UNABLE TO PASS 9,532' SLM W/ 3-1/2" WFD WRP RETRIEVAL TOOL. RETRIEVAL TOOL HAS SIGNS OF ASPHALTINES / PARAFFIN ON THE BASE. ***LDFN, WELL S/I & SECURED, CONTINUED ON 2/17/21 WSR*** 2/17/2021 ***CONTINUED FROM 2/16/21 WSR*** (Secure well) RAN 2.50" SAMPLE BAILER TO 10,457' SLM (Flapper broken - Tools back clean). RAN 2.76" G-RING TO TOP OF 3-1/2" WFD WRP AT 10,457' SLM. EQUALIZE & PULL COMPLETE 3-1/2" WFD WRP FROM 10,457' SLM / 10,500' MD. ***WELL S/I ON DEPARTURE, NOTIFIED DSO OF WELL STATUS*** Daily Report of Well Operations PBU 05-30 THE STATE °fALAS KA GOVERNOR MIKE DUNLEAVY Sean Mclaughlin Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 05-30 Permit to Drill Number: 191-115 Sundry Number: 320-063 Dear Mr. Mclaughlin: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.Qogcc.aloskc.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, VJ e M. rice Chair DATED this Q day of February, 2020. teWsI J FEB 14 2820 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 RXEGE1VED FFR I qn- n 1. Type of Request Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well 0 wn ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing❑ ram ❑ B r V Plug for Redrill 0 Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other IA Cement Squeeze ® , 2, Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0 5. Permit to Drill Number 191-115 t 3. Address: P.O. Box 196612 Anchorage, AK 8. 99519-6612 St2tigraphic ❑ Service ❑ API Number: 50-029-22213-00-00 t 7, If perforating. 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No 0 r PBU 05-30 9, Property Designation (Lease Number): I 10. Field/Pools. ADL 028326 ' PRUDHOE BAY. PRUDHOE OIL 11, PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft): Effective Depth MD'. Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 12000 8789 8997 8037 2575 8997,10500 None Casing Length Size MD TVD Buret Collapse Structural Conductor 80 20" 38-118 38-118 1490 470 Surface 3460 13-3/8" 38-3498 38-3498 5020 2260 Intermediate 9494 9-5/8" 37-9531 37 - 8357 6870 4760 Liner 1824 7" 9206 - 11030 8169 - a805 8160 7020 Liner 1236 4-112" 10758-11994 8786-8789 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade'. Tubing MD (ft): 1 9402-11949 8283-8788 4-'(2 12.81k x 3-1/2" 9.2# 13Cr85/13Cr80 34-10757 Packers and SSSV Type: 4-1/2" HES TNT Prod Packer Packers and SSSV MD (ft) and TVD (ft): 8973/8019 3-1/2" Baker D Packer 9145/8133 12. Attachments: Proposal Summary 0 Wellbore Schematic 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ St2tigraphic ❑ Development 0 Service ❑ 14. Estimated Date for Commencing Operations: March 1. 2020 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended 0 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Sperry, Nathan be deviated from without prior written approval. Contact Email: Nathan.Sperry0tip.com Authorized Name: Mdaughlin, Sean M Contact Phone: 907-564-4258 Authorized Title: En neering Team Lead - CTD Authorized Signature: / Date: Q Z 19 O 0 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test � Mechanical Integrity Test lY Location Clearance ❑ Other *Tbk�i1 M 1O 1 M.T^=!i KeplvleED �r i3oP6TE`�`RDSStt�psi �Vte-r1a1J[E' T6 xA�iC2 ?1+6(A-�-1�o a�eW Cewetti�`�r-zL-�nr 15 Q,P4�� [� is CA1734 Z tSap 1-o�fed.ro�a.,,llbe 1'{til�~t\%U �D��asss77vt6oee caS1.1q 3i1;r�.act Tule o ndialInjectionM Req'd? Yes No �'�„1a C�O2�per .1 Z�t1DQj`Ot16acrCY}e V% +19 rp` %�L.e IhI. dryt,T- Spacing Exception Required? Yes ❑ No Subsequent Form Required: P W7'p'mlac 10—`1��7 �.SmM.l'�c,c.Fe4.Re�lt�lA7 APPROVED BYTHE Approved COMMISSIONER COMMISSION Date: by: \w/ / :IBDMS�✓ Fro 14 2020 ORIGINALI' Submit Form and Form 10- 3 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attahment ir Duplicate To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry - CTD Engineer p Date: February 12, 2020 Re: 05-30 Sundry Approval Request Sundry approval is requested to plug off the 05-30 production as part of the drilling and completing the proposed 05-30A coiled tubing sidetrack. History of 05-30 05-30 was originally completed in 1991 and worked over in 2011. 05-30 has gassed out and there are no additional weliwork options to improve the oil rate. There is also a casing leak at 5,540' MD in the Cretaceous (top of UG4 is 4806' MD). Economics The geologic target being pursued cannot support a rig workover to fix the IA leak and a CTD sidetrack. Without an IA remedial squeeze, this well has no utility in the foreseeable future and the target would likely not be pursued. IA Cement Detail The PC leak will be remediated by placing cement between the 4-1/2" tubing and the 9-5/8" casing. A composite plug will be set at 8,950' MD and the tubing punched just above that. A composite retainer will be set at 8,930' MD and coil tubing will place ^265 bbls of 15.8ppg cement in the IA to 5,000' MD. The top of the UG4 is 4806' MD. The surface casing shoe is at 3498' MD. Long term integrity monitoring will include daily recording of the WHP's and biennial CMrr-T%IA's. Proposed plan for 05-30A The sidetrack will be a `3010' horizontal CST that will kicks -out from the 05-30 parent. The CST will establish offtake in the Sag River. The sidetrack will be drilled on or around September 2020. During pre -rig work, it is proposed to set a 3-1/2" whipstock at a kickoff depth of 9570' MD, cement the IA behind the KOP, and cement the IA above the packer to 5,000' MD to fix the casing leak. The rig will move in, test BOPE, mill the window, and drill into the Sag River formation. The proposed sidetrack will be completed with 2-3/8" 13Cr-80 solid liner and cemented in place. This Sundry covers Plugging the existing 05-30 Production via the liner cement job or liner top Packer, if the liner lap Pressure test fails (alternate Plug placement Per 20 AAC 25.112(i)). The following describes the work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current well and proposed sidetrack is attached for reference. Pre -Rig Work (scheduled to begin March 2020) 1. S LDL. Pull PX plug. Pull WRP. 2. EL Set CIBP at 10,500' MD. Tubing punch just above. 3. C Set 1 -trip retainer at 10,470' and circulate cement up to 9,400' MD in IA. 4. E Set CBP at 8,950'. Tubing punch just above. Set composite retainer at 8,930' MD. S. C Circ cement in IA to 5,000' MD. Mill out plugs and push to bottom. 6. S Drift for whipstock. 7. E Set whipstock at 9,570' MD. Sc. IM. T- Fe PL -E6 Cern ew — CrCC 8. 1 V I Pre -CTD tree work. %et>)e+.J 5uQt)k� 320 —063 Rig Work (scheduled to begin September 2020) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2575 psi). 5 ., 4-. W c 2. Mill 2.80" window and 10' of rathole. 3. Drill production section: 3.25" OH 4. Run 2-3/8" liner to TD. 5. Pump primary cement job: 23.4 bbls, 15.3 ppg Class G, TOC at TOL (-909(Y MD)*. 6. Freeze protect well to a min 2,200' TVDss. 7. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(1) AA-osS Variance Requests CO 736 Rule 2 A variance from the 1,500' TVD offset between TOC and surface casing shoe found in CO 736 rule 2 is requested. The proposed plan leaves 1,448' TVD (minimum) between the TOC at 5,000' MD and the surface casing shoe. Post -Rig Work: 1. V: Valve & tree work TD 2. SL/FB: Set LTP if needed. PT LTP. Set KO GLD. 3. C: Perforate -50' Nathan Sperry CC: Well File CTD Engineer Joe Lastufka 564-4258 WELLHEAD= FMC ACTUATOR= I DEV KB. ELEV= 73' BF. ELEV = ? KOP = 4217 Max Apple 1 Da 13-3/8' CSG, 6B#, L-80 BTC, D = 12.415' 3498' - DaW 0520/15 PROPOSED 05-30A _ dir11 mTVD= • 20' CONDUCTOR, I DEV MD = ' 91.5#, H40, DATE 3 8800'SS D=19.124' 1 MMG 13-3/8' CSG, 6B#, L-80 BTC, D = 12.415' 3498' - PC LEAK 5540' Minimum ID = 1.91" @ 9200' 2.70" DEPLOYMENT SLEEVE TOP OF 2x18' LNR 9090' 412' TBG, 122#, 13CR45 VAM TOP, 9098' .0152 bpf, D = 3.958' 312' TUBING STUB( 01r2611 1) 911W TOP OF T LNR I "/8' CSG. 47#. L-80 BUTT. D = 8.681' 1 1342'MONOBOREWHPSTOCK( / I J I 7- LNR, 29#, L50 BTC, .0371 bpf, D = 8.154' I—) 9670' 4-12• LNR, 122#, L-80 FL4S, .0152 bpf, D = 3.958' —967W PERFORATION SUMMARY REF LOG: ON_I /_ ANGLEATTOPPERF: @_' PB7D 2-38' LNR, _S.13CR45 ..._ bpf, D = 1204T SAFETY NOTES: V * WELL E NCILE> 70.910201'11 GAS LFT MANDRELS ST MD TVD I DEV I TY PEI VLV LATCH POR: DATE 3 3501 3500 1 MMG ON1Y RK 0 0520/15 2 5675 5505 40 MMG DMY RK 0 05/20/15 1 7905 7216 41 MMG DMY RK 0 01/27/11 8934' 412'H$XHP,D=3.813' J 7- X 412' HES TN: PROD PKR D=3.903' 8997'4-12' HES X NP, D = 3.813' 906T 41/7 FES XN HP, D= 3.725 9090' 3.70- DEPLOYSL V, D = 3.00' 909G 41/7X3-12'XO, D=2.992' 9113' 9-5/8' x 3117 11NDLE OVERSHOT 9144' P 312' LOC SEAL ASSY 9145' H 9-58' x 3-12' BKR D PKR 19518' X 7' BKR HYFLO LNR HGR MLI OUT WINDOW (05,30A), DATE REV BY COMMENTS DATE REV BY COMMENTS 101061!1 009 ORIGBIAL COMPLETION 0211280 NS/JMD BUI.'TPROPOSEDREV3 0128117 N7ES RIND I / CTO 0630A 12N2119 JMD BULTPROPOSED 12A3/19 JMD BUILT PROPOSED REV 1 01 N920 JMD BUILT PROPOSED REV PRUDHOE BAY UNIT WELL' 05-30A PERMIT No: API No: 50029-22213-01 BP Exploration (Alaska) TREE= 4-1/16' FMC WE_LHE4D= FMC ACTUATOR = BAKER C KB. E -EV = 73' BF. ELEV = ? KOP= 4212' Max Angle = 93• @ 11249' DaIUmMD= NA DBWmTVD= 8800'SS PROPOSAL 20' GOND, 110• 91.5#, H-40, D - 19.124' 13-3/8' CSG, 689, LA0 BTC, D =12.415' 3498' roc 50�0�0•. PC LEAK ®- Minimum ID = 2.76" @ 10732' 3-1/2" O"nS XN NIPPLE 4-10 TBG, 12.6#, 13Cf486 VAMTOP, 9096• .0152 bp1, D = 3.958" 3-12" TIBNG STIR ( 0126/11)9110• TOP OF T LNR 9209' (& 12' MONOBORF WHFSTOCK ( 0 0 7- LNR, 29#, LA0 BTC, .0371 bpf, D = 6.184" -9670' 4-12' LNR, 12.8#, LA0 FL4S, .0152 bpf, D = 3.958- -X9670' PERFORATION SUMMARY REF LOG: ON ANGLE AT TOP PERF: _' @ _' Note: Refer to Plodwfion DB br NsbdcW rfdata SIZE SPF INTERVAL I Opr4SqzDATE DATE 3 3501 3500 1 PBTD 2-3/8' LNR, #, 13CR-86 _ bpr. D = 12047' 05-30 SAFETY NOTES: "•W9IANGLE>70-@10201' •• 34)2"& 4-112' CHROMETBG•" SURFACE - 1300' OA, V,, a Tac CMT GAS LFT MANORAS ST M) TVD DEV TYPE VLV LATCH PORE DATE 3 3501 3500 1 MMG DMP RK 0 05020/15 2 5675 5505 40 MNG OM1' RK 0 05020/15 1 7905 72 RK 0 01/27/11 8934• 4-12- H6 X NP, D = 3.813• DATE 7• X 4-12• FES TNT PROD Fl(; 1)= 3.903• 8997'4-12' HES X NP, D = 3913' 906T 4-1/2•HESXNNP,D=3.725 9098' 4-1/2' X 3-12" XO, D = 2.992' 9113' 9-5/8 X 3-12' U KMOVERSHOT 8144• 3-12• LOC SEAL ASSY 9146' 9-5/8' X 3-12' BKR D WR 7' BKR HYFLO LNR HGR )TB X NIP D = 2.81 MILODT WINDOW (0530A) _ ' DATE REV BY COMMENTS DATE REV BY COMMENTS 10106/81 D-09 JORIGNAL COMPLETION 0528115 JMG/JMD GLV C/O (0520/15) 0128MI WE5 IRWO 0524/17 RB/JMD SETWRP(0523/17) 02/07/11 PJC/DAV GLV C/O 02005/11 0525/17 MRDJJMD ADPERFS 0524/17 02107/11 PJC DRLG DRAFT CORRECTIONS 1126/19 JL/JMD SET PX PLUG (1122/19) 0351/11 WCPJC PULL WRP 03/11/11 05102/11 PJC FINAL DRLG CORRECTIONS PRUDHOE BAY UNIT WELL: 05-30 PERMIT No: 1911150 API No: 50-029-22213-00 J1 N, RISE, 1561' FNL 8 36' BP Exploration (Alaska) To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry - CTD Engineer Date: January 30, 2020 Re: 05-30 Sundry Approval Request Sundry approval is requested to plug off the 05-30 production as proposed 05-30A coiled tubing sidetrack. by the drilling and completing the History of 05-30 05-30 was originally completed in 1991 and worked over in 2011. 05-30s gassed out and there are no additional wellwork options to improve the oil rate. There is also a casing leak at 5,540' MD n the Cretaceous (top of UG4 is 4806' MD). IA Cement Detail The PC leak will be remediated by placing cement between the be set at 8,950' MD and the tubing punched just above that. A will place "265 bbls of 15.8ppg cement in the IA to 5,000' MD.' at 3498' MD. Long term integrity monitoring will include daily re f2" tubing and the 9-5/8" casing. A composite plug will tposite retainer will be set at 8,930' MD and coil tubing top of the UG4 is 4806' MD. The surface casing shoe is of the WHP's and biennial CMIT-TxIA's. Proposed plan for 05-30A The sidetrack will be a `3010' horizontal CST that will kicks- ut from the 05-30 parent. The CST will establish offtake in the Sag River. The sidetrack will be drilled on or around Septe ber 2020. During pre -rig work, it is proposed to set a 3-1/2" whipstock at a kickoff depth of ^9570' MD, cement the IA ehind the KOP, and cement the IA above the packer to 5,000' MD to fix the casing leak. The rig will move in, test BOPE, mill the window, and drill into the Sag River formation. The proposed sidetrack will be completed with 2-3/8" 13Cr- 0 solid liner and cemented in place. This Sundry covers plugging Placement per 20 AAC 25.112011. The following describes the work planned and is sub itted as an attachment to Form 10-403. A schematic diagram of the current well and proposed sidetrack is attached for Oference. Pre -Rig Work (scheduled to begin March 2020) 1. S LDL. Pull PX plug. Pull WRP. 2. EL Set CIBP at 10,500' MD. Tubing pu ch just above. 3. C Set 1 -trip retainer at 10,470' and kculate cement up to 9,400' MD in IA. 4. E Set CBP at 8,950'. Tubing punch j st above. Set composite retainer at 8,930' MD. S. C Circ cement in IA to 5,000' MD. ill out plugs and push to bottom. 6. S Drift for whipstock. 7. IE Set whipstock at 9,570' MD. 8. 1 V I Pre -CTD tree work. Rig Work (scheduled to begin Septemb r 2020) 1. MIRU and test BOPE 250 psi I and 3,500 psi high (MASP 2575 psi). 2. Mill 2.80" window and 10' of lathole. 3. Drill production section: 3.25t OH 4. Run 2-3/8" liner to TD. S. Pump primary cementjob: 2h.4 bbls, 15.3 ppg Class G, TOC at TOL (^'9090' MD)`. 6. Freeze protect well to a mi 2,200' TVDss. 7. Close in tree, RDMO. Approved alternate plug placement per 20 AAC 25.112(i) Sw5Z-0 o Post -Rig Work: 1. V: Valve & tree work 2. SL/F8: Set LTP if needed. PT LTP. 3. C: Perforate 50' Nathan Sperry CTD Engineer 564-4258 Set KO GLD. t�� LHEAD = JATOR=_ ELEV = ELEV= ----- LEV = n MD= n ND= 20' CONDUCTOR, 118' 91.5#, 440, ID =19.124" 13-3/8" CSG, 68#, L-80 BTC, D = 12.415" 3488' Minimum ID = 2.750'@ 10732' 3-1/2" OTIS XN NIPPLE 4-12" TBG, 12.6#, 13CR-85 VAM TOP, .0152 bpf, D = 3.958" 3-12" TUBING STUB ( 0126/11) 9110' 9-5/8" 312' TBG, 9.2#, 13CR-80, .0087 bpf, D = 2.992'10746' TOP OF 4-12' LNR 1 7• LNR, 29#, L-80 BTC, .0371 bpf, D=6.184" 11030' FERFORATIONSLI M4RY REF LOG: RWD DENSITY/NHJTROIN ON 0926/91 ANGLE AT TOP FEW: 54" @ 9402' Note: Refer to Production DB for historical pert data SIZE SPF NTERVAL Opn/Sgz DATE 2-1/2' 6 9402-9433 O 0524/17 4-12" SLID 10974-11948 SLOT 10/05/91 4-12- LNR 12.6#, L-80 i = 3.958' 11994' ® 12000' 05-30 SAFETY NOTES: "" WELL ANGLE> 70' @ 10201' •• 3-12" & 4-12" CHROME TBG"* " HES X NIP, ID = 3.813' GAS LFT MANDRELS ST MD I TVD DEV I TYPEI VLV I LATCH I PORT DATE 3 3501 3500 1 MMG OMY RK 0 0520/15] 2 5676 Ss05 40 MMG DMY RK 0 0520/15' 1 7905 7216 41 MMG DMY RK 0 0127/11 j 1 8963' I 6�r] 14-12' HES X NIP. ID = 3.813" HLU X NIP, IU = PX PLUG 11122/ 906T I-14-12" F£5 XN NP, D = 3.7: 9096• 4-12" X 3-12' XO, D = 2.E 9113' 9-5/8" X 3-12' t1NDIJE OV 9144' 312' LOC SFAL ASSY 91� 9-5/8' X 3-1/2' BKR D PKR 9206' 1--19-5/8- X 7" BKR HY FLO LNR HGR 10600' 3-12" WRP(0523/17) 10732' 3-1/2' OTIS XN NP, D = 2.75' 10/05191 D-09ORIGINAL COMPLETION 1075T 4-12-TNV SEAL ASSY OVERSF 10756' 1 7" X 312' TiW HYDRO SET LTP ??? 1--1 PBTD DATE REV BY COMMENTS DATE REV BY COMMENTS 10/05191 D-09ORIGINAL COMPLETION 0528/15 JMG/JMD GLV C/O (0520/15) 0128H7 WES RWO 0524/17 RB/JMD SETWRP(0523/17 02/07/11 PJC/DAV GLV C/O 02105/11 0525/17 RD/JMD ADPERFS 0524117 02/07/11 PJC DRLG DRAFT CORRECTIONS 1126/19 JL/JMD SETPX PLUG(1122/19) 03131/11 WCIPJC PULL WRP 03/11/11 0 JNU D ADDED REF, BF, 8 COND DEPTHS 021032 M 05/02/11 PJC FINAL DRLG CORRECTIONS 3.903' PRUDHOE BAY UNIT WELL: 0530 PERMIT No: r1911150 API No: 50-029-22213-00 SEC 31, T11 N, R15E, 1561' FNL 8 36 BP Exploration (Alaska) 4-1/16" FMC PRE -RIG FMC B°° PROPOSAL WELLHEAD= 4-12• PX PLUG (1122/19) ACTUATOR = 4-1/7 FES XN NP, D= 3.725 KB. ELEV = 73' BF. ELEV = ? KOP= 4212' Max Angle = 93° @ 11249' Da !R NA DBhImTVD= 88GO'3S 191.5#, H-40, D = 19.724' 13-M- CSG, 680, LA0 BTC, D =12.415• 3498' T TOP OF IACMT L/ /� 6009' PC LEAK LIJ—) Minimum ID = 2.76" @ 107326 3-112" OTIS XN NIPPLE 4-12• TBG, 12.6#, 13CR-85 VAMTOP, 9096' .0152 bpf, D= 3.958" 312" TUBING STUB ( 0126/11) 9110' �- 13 -IIT TBG, 9.2#, YLUZa:Y5Fii11S.A 7" LNR , 29#, L-80 BTC, .0371 bpf, D= 6.184• 11030• PERFORATON SUUMIARY REF LOG_ RAD DENSFrY/NBJ RON ON 091 1 ANGLEAT TOP PEW 54" @ 9402' Nota: Prefer to Production DB for historical if data SIZE SPF MH7VAL Opn/Sgz GATE 2-12' 6 9402 - 9433 O 4/17 4-12' SLID 10974_11948 0974-11948 SLOT moms/91 471r LW 12.60, L-80 FL4S, .0752 bpf, D = 3.958" 11994• Iron 12000' SAFETY NOTES: '"' WELL ANGLE > 70' @ 10201' 015-30 " 3-12" & 4-12" CHROME TBG / �e<L e&eA J 4-1/2"GAS LFT MANOFELSr Luo, 4-12• PX PLUG (1122/19) 9087 4-1/7 FES XN NP, D= 3.725 REV BY COMMENTS MD TVD Dt1/ TYPE VLV LATCH PDRT DATE RWO 3501 5675 7905 350D 5505 7216 1 40 41 MNG MMG MMG DMY RK DMY w DMY RK 0 05201W 0 0520/15 0 0127/11' 02/07/11 8934' -j4-12"FESXNP,D=3.813" 7' X 4-12" FES TNT PROD PKR, 1)= 3.903" 8999 4-12- HES X NP, D - 3.813• 8997' 4-12• PX PLUG (1122/19) 9087 4-1/7 FES XN NP, D= 3.725 REV BY COMMENTS 4-12" X 3-12" XO, D= 2.99r 9113' 9-SIB"X3-1/7 UNDUE OVERSI-IDT 9144• 372' LOC SEAL ASSY 9299' 3-12. OTB X NP, D = 2.813" 10600' 3-12•wRP(osrz3/t7) 1 o73r 3-12" 071S XN NP, D = 2.75• 1075T 4-12• TNV SEAL ASSY O StSWT 1075V 7• X 372• TIW HYORD SEF LTP DATE REV BY COMMENTS DATE REV BY COMMENTS 1000591 0-09 ORIGINAL COMPLETION 0528/15 JMG/JMD GLV C/O (0520/15) 0728H1 N7E3 RWO 0524/17 RB/JMD SET WRP (D523/17) 02007/11 PJCJDAV GLV C/O 0295/11 0525/17 RD/JMD ADPERFS 0524/17 02/07/11 PJC DRLG DRAFT CORRECTIONS 1126/19 JUJMD SET PX PLUG (I l22/19) 03/31/11 WC/PJ PULL VVRP 03H1H1 05/02/11 PJC FINAL DRLG CORRECTIONS G�1H PRUDHOE BAY UNR WELL: 05-30 PERMIT No: 1911150 API NO: 50-029-22213-00 , T11N, R15E, 1561' FNL & 36 BP Exploration (Alaska) Well Sllmhole Quick Test Sub to Otis Top of 7" Otis Distances from top of riser Excluding quick -test sub Top of Annular CDR2-AC 4 Ram BOP Schematic Date 21 -Nov -17 ------------------- a -_._. Top of Annular Element Bottom Annular Ci Blind/Shears 9.3ft Cr 2" PipelSlips 10.1 ft 91 az Kill Line Ci 2-3/8" Pipe/Slips Ci 2" Pipe/Slips CL of Top Swab CL of Flow Cross CL of Master LDS LDS Ground Level 0 12.6 ft 13.4 ft Rig ii trip Pan 7-11iG Sk Flange X 7' tris Boa 93 �— Swab ae T1T�11� pp– ar, TT27''p�' s� Master 18.6 Ft 0 519 IA OA 0 Choke Line Test Pump Hose Sundry Application Plug for Re -drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re - drilled. Those wells that are not re -drilled immediately are identified every 6 months and assigned a current status of"Suspended." Ste Task 1 The initial reviewer will check to ensure that the "Plug for Redrill" box Res onsible Geologist in the upper left comer of Form 10-403 is checked. If the "Abandon" or % "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's v/ Q V, copies)., 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial % then it on both copies of the Form 10-403 (AOGCC's and operator's copies). '/ Instead, check the "Suspended" box and initial that change. Drilling " _ The drilling engineers will serve as quality control for steps 1 and 2. Engineer (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re -drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. • • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations m Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: -e+ W R P EV--- 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 191-115 3. Address: P.O.Box 196612 Anchorage, Development I3 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22213-00-00 7. Property Designation(Lease Number): ADL 0028326 8. Well Name and Number: PBU 05-30 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL RECEIVED ! 11.Present Well Condition Summary: Total Depth: measured 12000 feet Plugsr 9 measured 10500 feet In! 2 lT true vertical 8789 feet Junk I y 2017 measured feet Effective Depth: measured 10500 feet Packer measured See Attachment feet AOGCC true vertical 8743 feet Packer true vertical See Attachment feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 79 20"91.5#H-40 39-118 39-118 1490 470 Surface 3463 13-3/8"68#L-80 38-3501 38-3501 5020 2260 Intermediate 9486 9-5/8"47#L-80 36-9522 36-8352 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 9402-9433 feet feet 10975-11949 feet True vertical depth: 8283-8301 feet feet 8803-8788 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED JUL 2 52017, 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 539 42384 0 920 1786 Subsequent to operation: 637 18558 1 520 1867 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil El Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Oestgaard,Finn Contact Name: Oestgaard,Finn Authorized Title: Produc'on Engineer Challenger , Contact Email: Finn.Oestgaard@bp.com Authorized Signature: _ 10 74rap Date: //401 ii Contact Phone: +1 907 564 5026 Form 10-404 Revised 04/2017 7 / .1--'-L I-N - R B D M S 11,. JUN 2 8 2017 Submit Original Only • • • RECEIVED JUN 262017 AOGCC Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary June 23, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug and Adding of Perforations for Well 05-30, PTD # 191-115. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • Packers and SSV's Attachment PBU 05-30 SW Name Type MD TVD Depscription 05-30 TBG PACKER 8973.09 8019.27 4-1/2" HES TNT Perm Packer 05-30 TBG PACKER 9145.83 8133.62 3 1/2" BAKER MODEL D PACKER 05-30 PACKER 10761.2 8786.58 3-1/2"TIW SS Packer • .OO O O O O M CO CO N O N N- O U') 0 O N d 1- 1- co C.) 0000008 6. 0) N N- CO M N v_ 3 Nr O co O CO CO CO 00 00 0) 0 Y- N 0 0 0 0 O LO O o0 N 00 M 00 co 00 00 0D H 0) 00 CO Os CO NT Y- 01 01 01 MMM r- Ns M y- 00 00 CO COr N M r-01 CD Cr) 00 lO LNC) O O) N- O L• � M 0 0 �- V 2 ▪ 0 r Q M 000 M N e =0 0) o 0) • W I- 0- ulO O 00 O O O O O U CO J 0V' OD0p J M (U • d *k 0 0 4t 4t J .N N 0 0 N 0 N Co • N 00 N 0) U - c?Ul � � NN N 0) M co Ul CD O 0 000 N CO 000 c N- 0D N O CO J 00 CD Y- 0) W dJ V 0 u_ c c a Z Z Z 0 W W W m m O D ' Z Z J D fn Z J J H F- . • • / a a 2 2 o •g m Q / § - cc k _a ° 0 / j II �/ fX 0 uI e -o-0 0 -J , n . 7 co - 2 o G o d/ Cl)/ tn O coQ o O ' T)" V) D / G � w ' CO I- U) CM -J X02 in � $ cc 0 \ 0 0 co _ % 2 0 _J & / / 0 & E >,2,-.) ¥ 0_ -I a ® CO X77 0 - / O O 2 / a7 C >- E2 x 2q0 I0 / o 2 § / = 0 0) _ - % $ q@ E " 20- 2L o < < / 2 X02 \ § \ Ra)e o0 0m 2Z ce / 00303 2 � � R � \ o \ % X • Owed O � 22 III LI 7 >C1) LO f ° f E � 2 222a w \ 0E- n C o m J cr % R O ƒ � fe\ , Co % E-I 0_ q - q0/ / q7 \ 0 f m Aƒ @ = 2 2 CO _ . 7 & 4 a. k -a $ \ > _j u_ / ƒ �7 % \ LuLI CC 7 � > « Rf oiUb t � O ? � 2 CO = - / / / $ / ER / � k / 1D CI30- % I a - I � a m 0 > - 1- t m • < w - = w L = E2a _, 2 m 0 ■ 2 - (q - 2 I 2 0 u « E % 0 2 E e o q 7 « k w \ b ml- v) 2 ii D- z � / �� - 173 03 / � eeI- < nk ( � / § -=-.. 173 / / � ƒ / % 0 t / / k Lu--. F- � � nw w < LL ..J � f0 X52 / mW0 w * ® = E2L � •$ f . G Q. 0000 _1 m t | k 2 a. R 5 i 5 2 ƒ w k r r- ® >- d d % ® 0 0 > / _\ (NI � � � � b LO u) ® « 1Hd:E.= 41/16"FMC • NO **WELL ANGLE `ACTUATOR= BAKER C 05-30 **3-1/2"84 1//2""CHROME TBG`**70' 10201' KB.ELEV= 73' BF.ELEV= ? • LI KOP= 4212' Max Angle= 93`@ 11249' 20"CDNDUCTOR H 110�� Datum MD= NA 91.5#,ti-40, I I 2029' H4-1/2"HES X NP,D=3.813" Datum ND= 8800'SS D=19.124" GAS LFT MANDRELS 13-3/8'CSG,68#,L-80 BTC,D=12.415" —1 3498' J ST MD ND DEV TYPE VLV LATCH PORT DATE I 3 3501 3500 1 MMG DMY RK 0 05/20/15 2 5675 5505 40 MMG DMY RK 0 05/20/15 1 7905 7216 41 MMG DMY RK 0 01/27/11 Minimum ID =2.75" @ 10732' 3-1/2" OTIS XN NIPPLE I I 8934' -14-1/2"t-EsxNIP,D=3.813" 1. ir" , 8963' H 7"X 4-12"HES TNT PROD PKR,D=3.903" 8997' H4-1/2"HES X NP,D=3.813" 1 1 9067' H4-1/2"HES XN NP,D=3.725" 4-1/2"TBG, 12.6#,13CR.85 VAM TOP, H 9096' .0152 bpf,D=3.958" 9096' —14-1/2"X 3-1/2"XO,D=2.992" 3-1/2"TUBING STUB( 01/26/11) H 9110' �___--- 9113' H9-5/8"X 31/2"UNIQUE OVERSHOT —1 9144' H3-1/2"LOC SEAL ASSY.] 9145' H9-518"X 3-1/2"BKR 0 FKR TOP OF 7"LNR H 9206' __r 1--1 1 9206' H9-518"X 7"BKR HY FLO LNR HGR• [ 9298' —{3`112"OTIS X NP,D=2_813" J 9-5/8"CSG,47#,L-80 BUTT,D=8.681" —I 9531' A 10600 3-1/2 WRP(05/23/17) [ 10732' H3-1/2"OTts XN NP,D=2.75" 3-1/2"TBG,9.2#,13CR-80,.0087 bpf,D=2.992" —1 10746' I— 10757' —4-1/2"TTW SEAL ASSY OVERSHOT ITOP OF 41/2"LNR I-1 10758' 1 10758' 1-17"X 3-1/2"11W HYDRO SET LTP 0 7"LNR, 29#,L-80 BTC, .0371 bpf,ID=6.184" H 11030' _A , PERFORATION SUMMARY I I REF LOG:RIND DENSITY/NEUTRON ON 09/26/91 I I ANGLE AT TOP PERF:54"@ 9402' Note:Refer to Production DB for historical perf data I I SEE SPF INTERVAL Opn/Sqz DATE I 2-1/2" 6 9402-9433 0 05/24/17 I 4-1/2" SLID 10974-11948 SLOT 10/05/91 I I ��� '� I JHPBTDI 4-112"LNR, 12.6#,L-80 FL4S,.0152 bpf,D=3.958" —{ 11994' 1.S.1....�...I.� TD H 12000' J ►....* DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/05/91 0-09 ORIGINAL COMPLETION 05/28/15 JMG/JMD GLV GO(05/20/15) WELL: 05-30 01/28/11 N7E5 RWO 05/24/17 RB/JMD SET WRP(05/23/17) PERMIT No:'1911150 02/07/11 PJC/CAV GLV CIO(02/05/11) 05/25/17 MRD/JMD ADPERFS(05/24/17) API No: 50-029-22213-00 02/07/11 PJC DRLG DRAFT CORRECTIONS SEC 31,T11 N,R15E,1561'FNL&36'FEL 03/31/11 SWC/PJC PULL WRP(03/11/11) 05/02/11 PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) • PB(4 Q5 -30 lctl(15c Regg, James B (DOA) From: AK, OPS FF Well Ops Comp Rep [AKOPSFFWeIIOpsCompRep @bp.com] Sent: Tuesday, March 05, 2013 8:45 AM To: Regg, James B (DOA) 4 3 Cc: Redmond, Randy 1 Subject: PBU 05 -30 flowline unsupported Mr. Regg, The repair work of adjusting and leveling the VSM's and piping has been completed on the PBU 05 -30 flowline. Our work order number for this repair was 43311176 and we also tracked it's completion in our Traction system (number 2012 - event - 4288395). Thank You, David Spall FF Well Ops Compliance Rep SCANI'jE BP Exploration (Alaska) Inc. PBOC - B103 Office: (907) 659 -5332 Cell: (907) 350 -2473 Harmony - 7187 1 1 • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 0 Anchorage, Alaska 99519 -6612 May 11, 2012 Mr. Jim Regg AUG Alaska Oil and Gas Conservation Commission 1 S 333 West 7 Avenue q y Anchorage, Alaska 99501 Ir r Subject: Corrosion Inhibitor Treatments of GPB DS -05 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS- 05 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) DS-05 Date: 01/10/2012 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft gal 05-01C 1990280 50029201360000 Sealed conductor NA NA N/A N/A NA 05 -02A 2012410 50029201440100 Sealed conductor NA NA N/A N/A NA 05 -03C 2000940 50029201470300 Sealed conductor NA NA N/A N/A NA 05 -04A 1960890 50029201520100 Sealed conductor NA NA N/A N/A NA 05 -05B 1961800 50029201700200 Sealed conductor NA NA N/A N/A NA 05 -06A 1950840 50029201730100 0 NA 0 N/A N/A NA 05 -07 1770130 50029202430000 Sealed conductor NA NA N/A N/A NA 05 -08A 2100550 50029202480100 Sealed conductor NA NA N/A N/A NA 05 -09A 1990140 50029202540100 Sealed conductor NA NA N/A N/A NA 05 -10C 2070980 50029202630300 Sealed conductor NA NA N/A N/A NA 05 -11A 1960970 50029202520100 Sealed conductor NA NA N/A N/A NA 05 -12B 2011800 50029202440200 Sealed conductor NA NA N/A N/A NA 05 -13B 2071460 50029202500200 Sealed conductor NA NA N/A N/A NA 05 -14A 1930820 50029202530100 Sealed conductor NA NA N/A N/A NA 05 -15B 1960230 50029202550200 Sealed conductor NA NA N/A N/A NA 05 -16B 1991000 50029202620200 Sealed conductor NA NA N/A N/A NA 05 -17B 1981040 50029202710200 Sealed conductor NA NA N/A N/A NA 05 -18A 1981740 50029219600100 Split conductor NA NA N/A N/A N/A 05 -19 1890780 50029219620000 1.4 NA 1.4 N/A 8.5 4/11/2011 05 -20B 2042340 50029221370200 1.2 NA 1.2 N/A 5.1 4/18/2011 05 -21A 1981180 50029219690100 Dust Cover NA NA N/A N/A N/A 05 -22B 2071260 50029219760200 3.1 NA 3.1 N/A 18.7 4/17/2011 05 -23B 2080610 50029219630200 1.2 NA 1.2 N/A 5.1 4/11/2011 05 -24A 2042180 50029222040100 1.5 NA 1.5 N/A 10.2 4/11/2011 05 -25C 2091240 50029219880300 6.0 NA 6.0 N/A 44.2 4/18/2011 05 -26A 2012210 50029219840100 0.5 NA 0.5 N/A 3.4 4/12/2011 05 -27B 2081910 50029219790200 Sealed conductor NA NA N/A N/A N/A 05 -28B 2060890 50029222080200 0.6 NA 0.6 N/A _ 1.7 4/10/2011 --, 05 -30 1911150 50029222130000 1.2 NA 1.2 N/A 10.2 4/11/2011 05-31B 2100850 50029221590200 1.3 NA 1.3 N/A 6.8 4/12/2011 05 -32A 2020010 50029221900100 20.0 6.0 0.5 7/13/2011 3.4 7/23/2011 05 -33B 2100810 50029221680200 4.8 NA 4.8 N/A _ 37.4 4/27/2011 05 -34A 2080370 50029222170100 3.9 NA 3.9 N/A 18.7 1/4/2012 05 -35A 2081340 50029221720100 2.7 NA 2.7 N/A 18.7 4/18/2011 05 -36A 2050700 50029221820100 2.3 NA 2.3 N/A 13.6 4/12/2011 05 -38 1961850 50029227220000 1.8 NA 1.8 N/A 15.3 4/10/2011 05 -39 1961730 50029227150000 1.3 NA 1.3 N/A 10.2 4/10/2011 05-40 1961590 50029227070000 1.6 N/A 1.6 N/A 16.2 1/10/2012 05 -41A 2031700 50029226960100 5.0 NA 5.0 N/A 58.7 1/8/2012 . STATE OF ALASKA ALASK,L AND GAS CONSERVATION COMMIN RECEIVE' REPORT OF SUNDRY WELL OPERA MAR 1 0 all 1. Operations Performed: �� g� e CO0S. Ci0El MiSS101 0 Abandon I .11 )'4 Repair Well ❑Plug Perforations 0 Stimulate ❑ Re- r uspend WW l 1 Alter Casing ® Pull Tubing ❑ Perforate New Pool ❑ Waiver ❑ Other Anchorage ❑ Change Approved Program ❑ Operation Shutdown ❑ Perforate ❑ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ® Development ❑ Exploratory + 191 -115 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 .50 -029- 22213 -00 -00 7. Property Designation: 8. Well Name and Number. ADL 028326 # PBU 05 9. Field / Pool(s): _ Prudhoe Bay Field / Prudhoe Bay Oil Pool 10. Present well condition summary Total depth: measured 12000' feet Plugs (measured) 9202' feet true vertical 8789' feet Junk (measured) Effective depth: measured 12000' feet Packer: (measured) 8963' / 9145' feet true vertical 8789' feet Packer: (true vertical) 8012' / 8133' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 110' 110' Surface 3498' 13 -3/8" 3498' 3498' 4930 2270 Intermediate 9531' 9 -5/8" 9531' 8357' 6870 4760 Production Liner 1836' 7" 9206' - 11030' 8168' - 8805' 8160 7020 Liner 1267' 4-1/2" 10758' - 11994' 8786' - 8789' 8430 7500 Perforation Depth: Measured Depth: Slotted: 10974' - 11948' True Vertical Depth: 8803' - 8788' Tubing (size, grade, measured and true vertical depth): 4 -1/2 ", 12.6# 13Cr -85 9098' MD 8105' TVD 3 -1/2 ", 9.2# 13Cr -80 10757' MD 8786' TVD Packers and SSSV (type, measured and true vertical depth): 7" x 4-1/2" HES TNT Prod Packer 8963' MD 8012' TVD 9 -5/8" x 3 -1/2" BKR D Packer 9145' MD 8133' TVD 11. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Set WRP @ 9202' MD. Cut and pulled 4 -1/2" x 3 -1/2" tubing from 9115' MD. Change 9 -5/8" casing pack -off. Replace choke line HCR. Tag tubing stub at 9113' MD. Clean out and run new 4 -1/2" chrome tubing. Left WRP in the hole. 12. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 20 0 Subsequent to operation: 0 0 0 10 0 13. Attachments: ❑ Copies of Logs and Surveys run 14. Well Class after work: ❑ Exploratory ® Development ❑ Service ❑ Stratigraphic ® Daily Report of Well Operations ® Well Schematic Diagram 15. Well Status after work: ❑ GINJ ' ® OH SUSP ❑ WDSPL ❑ Gas ❑ GSTOR ❑ SPLUG ❑ WAG ❑ WINJ 16. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact David Bjork, 564 -5683 N/A Printed Name Elizabeth Barker Title Drilling Technologist Prepared By Name/Number. Signature `` C� Phone 564 -5674 Date ,,3/O�, ii Elizabeth Barker, 564 - 5674 Form 10-404 Revised • r • 1 !I S M 1 0 2011 cl(&01 f4 Submit Original Only • • 05 -30 Well History (Pre -Rig Workover) Date Summary 11/7/2010 PPPOT -T: Stung into test port (0+ psi), bled to 0 psi. Function LDS, all moved freely (1"). Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 200 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT -IC: Stung into test port (0+ psi), bled to 0 psi. Function LDS, all moved freely (1"). Unable to pump through void, single port. Pressured void to 3500 psi for 30 min test, lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. 11/7/2010 CMIT -Tx IA PASSED to 3000 psi, MIT -OA to 2000 psi (Pre RWO). CMIT -TxIA; Passed on second attempt. Pumped 2 bbls meth and 17.1 bbls crude down TBG to reach test pressure. TBG /IA lost 40/100 psi in the 1st 15 mins and TBG lost 20 psi and IA gained 100 psi. Monitored for additional 15 mins and TBG /IA lost 0/0 psi, Bled back TBG /IA psi (approx 10 bbls) 11/8/2010 MIT -OA PASSED to 2000 psi (Pre RWO) Pumped 5.7 bbls crude down OA to reach test pressure. OA lost 110 psi 1st 15 mins and 30 psi in the 2nd 15 mins for a total loss of 140 psi during the 30 min test. Bled OA psi (approx. 2 bbls) 11/8/2010 CMIT -TxIA PASSED to 3500 psi (Pre RWO) Pumped 12.8 bbls crude down TBG to pressure TBG and IA to test pressure. TBG /IA lost 70/0 psi in the 1st 15 mins and 10/0 psi in the 2nd 15 mins for a total loss of 80/0 psi during the 30 min test. Bled TBG /IA psi (approx 12 bbls). 11/14/2010 RAN 2,50" CENT & 2 1/2" JDC, PULL P -PRONG FROM 3 -1/2" PX PLUG BODY FROM 9276' SLM. 11/15/2010 PULL 3 -1/2" PX PLUG BODY FROM X NIP @ 9282' SLM/9298' MD USE HES SLICKSHOT ETD TO SET 3 1/2" WEATHERFORD WRP @ 9186' SLM / 9202' MD. LRS PERFORMED PASSING CMIT TxIA TO 3500 PSI. 11/15/2010 Fullbore WSL called in flange leak between SSVand Flowcross. Verified barriers. Torqued MV x SSV , SSV x FC, FC x WV to spec. Pressure tested above master to shut wing valve to 500 psi for 5 min and 5000 psi for 15 min (pass) bled off pressure and turned over to LRS. 11/15/2010 CMIT TxIA passed to 3500 psi (RWO Prep) Pump 8 bbls 60/40 meth, 19.5 bbls diesel down IA to achieve test pressure. T /IA lost 40/20 psi 1st 15 min, Flowcross flange started leaking at 29 min mark of test. FMC re- torqued flange bolts and tested to 5000 psi for 15 min lost 150 psi no external leaking. Pumped 4 bbls 60/40 meth & 15 bbls diesel down IA to achieve test pressure. Test #1 T /IA lost 0/0 psi 1st 15 min, 40/40 psi 2nd 15 min total loss of 40/40 psi in 30 min. Test #2 repressured with .2 bbls diesel T /IA lost 0 psi 1st 15 min, 0 psi 2nd 15 min. for a toatl loss of 0 Psi in 30 Min Test. Bled IA x TBG to 500 Osi. 11/19/2010 DUMPED -8' OF SLUGGITS FROM 9186' SLM TO 9178' SLM. SET 10' x 3 -1/2" JUNK BASKET (10.3' OAL, 2.70" MAX OD), 3 -1/2" G FN @ 9164' SLM 11/20/2010 Set 4" ISA BPV thru tree at 108" wtith no extentions. Bled down tree and verified no pressure between the wing valve and lateral valve. Torqued studs and nuts on adapter x MV / Swab valve x cross / and tree cap. There was little or no movement on any of the connections. All other flanges had been torqued previously. Removed 3 1/8" companion valve intergal flange and replaced with 3 1/8 5K flange. Pulled BPV and installed TTP. Tested tree and flange to 500/5000 psi. Both tests passed. 11/25/2010 POWER JET CUT 3.5" TUBING AT 9113' (NEAR TOP OF FIRST FULL JOINT ABOVE PACKER) CMIT TXIA TO 500 PSI PASS 11/29/2010 Pumped .4 bbsl neat down TBG w/ IA jumper SI to pressure up to 1000 psi, no apparent communication w /IA. Pumped 2.5 bbls diesel down IA w/TBG jumper SI to pressure up to 1000 psi, TP pressure tracked. Pumped 2.5 bbls diesel down TBG, up IA to 05 -23 FL to establish circulation rate of .3 bpm @ 3000 psi. Bled TxIAP. Page 1 of 2 • • 05 -30 Well History (Pre -Rig Workover) Date Summary 12/13/2010 RIH WITH 21'X 2.75" TOOLSTRING. CUT 3.5" TUBING AT 9115' WITH 2.75" POWERCUTTER: CCL TO CUTTER = 6.3 FT, CCL STOP DEPTH = 9108.7 FT. POSITIVE INDICATION OF SHOT. LRS PUMPS 30 BBLS FREEZE PROTECT TO CONFIRM CUT. 12/13/2010 (Mini -circ -out to insure tbg cut) Spear into IA w/ 5 bbls neat meth followed by 25 bbls crude @ 2 bpm taking returns up tbg to FL to insure the tbg is cut. Tbg is cut. Freeze protect FL w/ 5 bbls neat meth & 61 bbls crude. Pressure up on FL to 1500 psi. 12/18/2010 Circ -out/ CMIT TxIA Passed to 1120 psi (RWO Prep) Pumped 5 bbls Neat Methanol spear followed by 944 bbls105* F Seawater down TBG while taking returns up IA to flowline on well 23. Swaped to IA and pumped 171 bbls 80 *F Diesel down the IA while taking returns up the TBG to flowline on well 23. U -tubed freeze protect for 90 minutes. CMIT TxIA lost 0 psi in 30 minutes. 12/19/2010 Thaw hardline jumper and freeze protect with 7 bbls neat methanol 12/25/2010 PULLED RK -DGLV FROM CHEMICAL INJECT MANDREL @ 8829' SLM, 8840' MD. PURGED CHEMICAL INJECTION LINE WITH 1 BBL DIESEL 12/31/2010 MV tested to 500 psi for 5 min. (passed); remove tree cap & install lubricator, test to 300 & 3500 psi for 5 min. (passed); Set 4 -16" FMC "ISA" BPV #541 thru tree for 7ES pre -rig; 1 -18" ext. used, tagged @ 84 "; Re -test MV to 500 psi for 5 min. (passed); Installed tree cap, pulled CV and installed tapped blind flange and tested to 300 psi & 5000 psi for 5 min. ea. (passed); No Problems Page 2 of 2 TREE _ ? WELLHEAD= CIW • SAFETY S: *** WELL ANGLE > 70° @ 10201' ACTUATOR = AXELSON 05-30 ** 3-1/2" & -1 /2" CHROME TBG*** KB. ELEV 73' PJC DRAFT BF.ELEV= ? ' I KOP = 4212' Max Angle = 93° @ 11249' 20" CONDUCTOR, --I 110' I Datum MD = NA 91.5 #, H -40, 2029' H4-1/2" GAS HES X LIFT NIPMA ID = 3.813ELS " Datum TV D = 8800' SS ID = 19.124" 13 -3/8" CSG, 68 #, L -80 BTC, ID = 12.415" 1-1 3498' I--• ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3501 3500 1 MMG DOME RK 16 02/05/11 2 5675 5505 40 MMG SO RK 20 02/05/11 1 7905 7216 41 MMG DMY RK 0 01/27/11 Minimum ID = 2.75" @ 10732' 8934' H4 -1/2" HES X NIP, ID = 3.813" I 3 -1/2" OTIS XN NIPPLE j 8963' 1-17" X 4 -12" HES TNT PROD PKR, ID = 3.903" I 8997' I- 4 -1/2" HES X NIP, ID = 3.813" I I 9067' H4-1/2" HES XN NIP, ID = 3.725" I 4 -1/2" TBG, 12.6 #, 13CR -85 VAM TOP, -1 9096' 0 0152 bpf, ID = 3.958" 996 H4 -1/2" X 3 -1/2" XO, ID = 2.992" I 3 -1/2" TUBING STUB ( 01/26/11) I--I 9110' 9113' I- I9 -5/8" X 3 -1/2" UNIQUE OVERSHOT ( 9144' I--- I3 -1/2" LOC SEAL ASSY I 9145' H 9 -5/8" X 3 -1/2" BKR D PKR 1 9202' I -13 -1/2" WRP(11/15/10) I I TOP OF 7" LNR I—I 9206' N 1 9206' H9-5/8" X 7" BKR HY FLO LNR HGR I 9298' I- I3 -1/2" OTIS X NIP, ID = 2.813" I 19 -5/8" CSG, 47 #, L -80 BUTT, ID = 8.681" I-{ 9531' 10732' H3-1/2" OTIS XN NIP, ID = 2.75" I 3 -1/2" TBG, 9.2 #, 13CR -80, .0087 bpf, ID = 2.992" H 10746' I-- 10757' I- 14 -1/2" TI■ SEAL ASSY OVERSHOT) ITOP OF 4 -1/2" LNR I 10758' 10758' I-17" X 3 -1/2" TNV HYDRO SET LTP 1 17" LNR, 29 #, L -80 BTC, .0371 bpf, ID = 6.184" H 11030' I --4 PERFORATION SUMMARY 1 REF LOG: RWD DENSITY /NEUTRON ON 09/26/91 1 1 ANGLE AT TOP PERF: ° @ ' Note: Refer to Production DB for historical perf data 1 1 SIZE SPF INTERVAL Opn /Sqz DATE 1 1 4 -1/2" SLTD 10974 - 11948 SLOT 10/05/91 1 1 1 ? ?? H PBTD I W 1'11'1 14 -1/2" LNR, 12.6 #, L -80 FL4S, .0152 bpf, ID = 3.958" I 11994' MO* OM I TD H 12000' 1 UAW, DATE REV BY COMMENTS ® DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/05/91 D -09 ORIGINAL COMPLETION WELL: 05 -30 01/28/11 N7ES RWO PERMIT No: 1911150 02/07/11 PJC /DAV GLV C/O (02/05/11) API No: 50- 029 - 22213 -00 02/07/11 PJC DRLG DRAFT CORRECTIONS SEC 31, T11 N, R15E, 1561' FNL & 36' FEL BP Exploration (Alaska) • • a wrthAmerida - ALAsm B tOf *I .. , s Op ration Summary Report Common Well Name: 05 -30 AFE No Event Type: WORKOVER (WO) 1 Start Date: 1/5/2011 1 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. 1 UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ' (ft) l 1/5/2011 00:00 - 03:00 l i 3.00 MOB P PRE MOB SAT. CAMP, SHOP AND PITS TO DS -5 03:00 - 06:00 3.00 MOB 1 P PRE RD FLOOR, BRIDLE UP & LAY OVER DERRICK 06:00 - 11:00 5.00 MOB P PRE W/O CRANE TO PICK SPOC SHACK, DUE TO 1 } ,DELAY FROM EMERGENCY RESPONSE ON OTHER LOCATION 11:00 - 11:30 0.50 MOB P PRE I PJSM WITH SECURITY 11:30 - 00:00 12.50 MOB P PRE MOVE RIG OFFS PAD TO FRONTIER CORNER 1/6/2011 00:00 - 06:00 6.00 MOB P PRE I MOB RIG TO DS -5 06:00 - 11:00 5.00 MOB P PRE i RIG ON DS5, MOVE IN OVER WELL, SPOT UP, RAISE DERRICK. 11:00 - 11:30 0.50 MOB P PRE SAFETY, OPERATIONS & ELEVATED RISK I WELL MEETING W/ RWO SUPT AND NIGHT CREW. 11:30 - 13:00 1.50 MOB P 1 PRE CREW CHANGE, SAFETY, OPERATIONS & ELEVATED RISK WELL MEETING W/ RWO SUPT AND DAY CREW. PRE -SPUD & PRE-TOUR MEETING WITH DAY CREW 113:00 - 17:30 4.50 MOB P PRE RU. BRIDLE DOWN. HANG BRIDLE LINES. SECURE DERRICK. RU RIG FLOOR. SPOT CUTTINGS TANK. RU TIGER TANK AND HARD ;LINES 117:30 19:00 1.50 MOB P PRE RU RIG CIRC LINES IN CELLAR. * *RIG ACCEPTED @ 18:00 HRS ** 19:00 - 20:00 1.00 RIGU P PRE I PERFORM RIG EVAC DRILL AND AAR WITH CREW 20:00 23:00 3.00 RIGU P - '; PRE ' TEST TREE & PULL SWAB CAP. RU LUB. AND TEST 250 PSI LOW & 3,500 PSI HIGH. PULL BPV. 23:00 00:00 1.00 E. RIGU P j DECOMP RU CIRC FLANGE ON TREE. 1/7/2011 00:00 00:30 0.50 WHSUR P DECOMP NIPPLE UP TOP FLANGE ON TREE 00:30 - 02:30 2.00 WHSUR P DECOMP CIRC 8.4 PPG BRINE DOWN IA AND UP TBG TO RECOVER FREEZE PROTECT - RECOVER 47 BBLS DIESEL 02:30 - 04:30 2.00 WHSUR P DECOMP CIRC 8.4 PPG BRINE DOWN TBG AND IA TO RECOVER FREEZE PROTECT I - RECOVER 166 BBLS DIESEL _ - FLOW CHECK WELL - WELL STATIC 04:30 - 06:00 1.50 WHSUR P DECOMP RU LUB & TEST - 250 PSI LOW, 3,500 PSI HIGH - SET & TESTED BACK PRESSURE VALVE - TESTED TO 1000 PSI FROM THE BACKSIDE FOR 10 MINUTES - RD LUBRICATOR & TEST LINES 106:00 - 09:30 3.50 WHSUR P DECOMP BLEED OFF CONTROL & CHEMICAL INJECTION LINES - BLEED —1 BBL OF DIESEL FROM CHEMICAL I INJECTION LINE TO BLEED TANK - BREAK NUTS ON TREE & ADAPTOR 09:30 10:30 1.00 WHSUR P r DECOMP ND TREE AND ADAPTOR, CUT AND CAP CONTROL & CHEMICAL INJECTION LINES. Printed 3/4/2011 10:38:58AM �h ricer A44S A BP Paige 2 : x Operat'on Sumlmairyr Report Common Well Name: 05 -30 AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 1 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay I Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: - Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task ' Code I NPT NPT Depth Phase I Description of Operations (ft) ' 10 :30 - 11:30 1.00 i BOPSUR P ' O DECOMP I INSPECT THREADS ON 9-3/4" LH ACME 1 TUBING HANGER, THREADS GOOD -DUMMY RUN WITH XO, 5 -1/2 TURNS TO MAKE UP - INSTALLED ISA BLANKING PLUG. 11:30 - 13:00 1.50 BOPSUR I AN P DECOMP k SAFETY, OPERATIONS & ELEVATED RISK I WELL MEETING W/ RWO SUPT AND NEW DAY I "'CREW. PRE -SPUD & PRE -TOUR MEETING I I WITH DAY CREW 13:00 - 18:00 5.00 BOPSUR P DECOMP NU BOPE, SET DSA & SPACE OUT SPOOL ON ------ - - - - -- - - - - -- - — 18:00 TUBINGSPOOL. 19:00 1.00 BOPSUR P DECOMP RIG UP TO TEST BOPE 19:00 - 00:00 5.00 BOPSUR 1 P DECOMP TEST BOPE - TEST BOPE AND CHOKE MANIFOLD TO 1 3,500 PSI HIGH AND 25I PSI LOW WITH 3 -1/2" j & 4 -1/2" TEST JOINT. TEST ANNULAR PREVENTER TO 3,500 PSI HIGH AND 250 PSI I LOW WITH 3.1/2" TEST JOINT. TEST 0 ACCUMULATOR UNIT. - AOGCC REP JEFF JONES WAIVED WITNESS TO TEST AT 17:45 HRS ON 1/5/2011. TEST - WITNESSED BY NAD TOUR PUSHER BIFF I PERRY AND BP WSL JEFF LOFTIS. 1/8/2011 00:00 - 02:00 2.00 BOPSUR 1 P DECOMP .I CONTINUE TEST BOPE 1 - TEST BOPE AND CHOKE MANIFOLD TO 3,500 PSI HIGH AND 250 PSI LOW WITH 3 -1/2" & 4 -1/2" TEST JOINT. TEST ANNULAR 1 I , PREVENTER TO 3,500 PSI HIGH AND 250 PSI LOW WITH 3 -1/2" TEST JOINT. TEST 'ACCUMULATOR UNIT. , I- AOGCC REP JEFF JONES WAIVED WITNESS TO TEST AT 17:45 HRS ON 1/5/2011. TEST WITNESSED BY NAD TOUR PUSHER BIFF ■ PERRY AND BP WSL JEFF LOFTIS. 1 RD TEST EQUIPMENT 02:00 - 05:00 3.00 BOPSUR P DECOMP ' RU LUB & LUBRICATOR EXTENTION, AND SPACE OUT 1 05:00 - 07:00 2.00 1 BOPSUR P DECOMP ATTEMPT TO TEST LUBRICATOR & EXTENSION BETWEEN BLANKING PLUG AND I I UPPER VRB PIPE RAMS -FOUND WEEPING FLANGE 07:00 - 07:30 0.50 BOPSUR P DECOMP I PULL BLANKING PLUG 07:30 - 10:00 2.50 BOPSUR P j DECOMP STAB LUBRICATOR & EXTENSION - TEST - PRESSURE TEST #1 LOW 250 PSI, HIGH 3000 PSI FOR 5 MIN WITH 3000 PSI ON THE BACKSIDE. PASSED. ATTEMPT TO PULL BACK PRESSURE VALVE, I NOT RETRIEVED - PRESSURE TEST #2 LOW 250 PSI, HIGH 3000 ' PSI FOR 5 MIN WITH 3000 PSI ON THE BACKSIDE. PASSED. 10 00 11:00 1.00 BOPSUR P I DECOMP PULL BACK PRESSURE VALVE, RECOVERED TO SURFACE. 11:00 11:30 0.50 EVAL P , DECOMP ! MONITOR WELL - WELL OUT OF BALANCE. MONITOR AND j 1 MEASURE FLUID UNTIL STATIC. 1 1 1:30 - 12:30 1.00 , BOPSUR P DECOMP RD DSM LUBRICATOR I Printed 3/4/2011 10:38:58AM Mica ALAS BP 7 ; of x C Operation Sum Report, Common Well Name: 05 -30 ( AFE No Event Type: WORKOVER (WO) ! Start Date: 1/5/2011 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay � Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 ©73.00ft (above Mean Sea Level) Date ! From - To Hrs Task ; Code NPT I NPT Depth Phase Description of Operations (hr) ,I (ft) ' — — 12:30 - 18:00 5.50 EVAL P DECOMP 1 CIRC AND CONDITION THRU CHOKE - CIRC. DOWN TBG ( CUT @ 9,115' MD) WITH RETURNS FROM IA THRU OPEN CHOKE & I I GAS BUSTER TO PITS - STAGE PUMPS UP - 2- BPM @ 210 PSI 3 BPM @ 290 PSI ` ** MONITOR GAS BUSTER VENT DURING _ _ ! CIRC. TIME ** 18:00 00:00 6.00 EVAL N WAIT DECOMP CIRC WELL DUE TO FIELD WIDE SHUT DOWN WO ORDERS TO PROCEED 1/9/2011 00:00 DECOMP C 06:00 6.00 EVAL N WAIT CIRC WELL INTERMITANTLY DUE TO FIELD WIDE SHUT DOWN „ WO ORDERS TO PROCEED I I .1- G1RC DOWN IA THRU TBG ( CUT @ 9115') 1 1 - CIRC EVERY HOUR @ 3 BPM & 175 PSI FOR 1 5 MIN. - FLOW CHECK WELL AFTER EACH CIRC. 06:00 - 17:30 11.50 CLEAN P DECOMP PU DRILL PIPE AND STAND BACK FOR CLEAN OUT CONDUCT H2S DRILL, AAR & PU DP - SIMOPS CIRC EVERY HOUR @ 3 BPM & 175 PSI FOR 5 MIN. 17:30 - 00:00 6.50- ! EVAL N WAIT DECOMP CIRC WELL INTERMITANTLY DUE TO FIELD WIDE SHUT DOWN - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT @ 9115') C IR C EVERY HOUR @ 3 BPM & 175 PSI FOR 5 MIN. - FLOW CHECK WELL AFTER EACH CIRC. 1/10/2011 I 00:00 - 12:00 12.00 EVAL N WAIT DECOMP 1 CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN I - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT @ 9115') - CIRC EVERY HOUR @ 3 BPM & 140 PSI FOR 5 MIN. I - FLOW CHECK WELL AFTER EACH CIRC. SIMOPS - PREP TBG IN PIPE SHED, SERVICE IRON ROUGHNECK, MAINT. & CLEANING 12:00 - 22:30 10.50 EVAL N WAIT DECOMP CIRC WELL INTERMITANTLY DUE TO FIELD I WIDE SHUT DOWN - WO ORDERS TO PROCEED , 1- CIRC DOWN IA THRU TBG ( CUT @ 9115') 1 - CIRC EVERY HOUR @ 3 BPM & 175 PSI FOR i 5 MIN. - FLOW CHECK WELL AFTER EACH CIRC. i SIMOPS - TEST EMERGENCY LIGHTING, AUDIT RIG, CHANGE OUT WASH PIPE ON _ITOP DRIVE & PRESS TEST 300/2700 PSI. 22:30 00:00 1.50 EVAL N 1 DECOMP CIRC WELL CONSTANTLY DOWN IA AND UP I I TBG - 62 GPM @ 40 PSI I SIMOPS - RD RISER AND ADAPTER. RU I DUTCH RISER SYSTEM Printed 3/4/2011 10:38:58AM si / k' . Operat Summary: Report Common Well Name: 05 -30 AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) I _ _ Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/11/2011 00:00 - 01:30 1.50 EVAL N WAIT DECOMP CIRC WELL CONSTANTLY DOWN IA AND UP TBG 1- 62 GPM @ 40 PSI SIMOPS - RD RISER AND ADAPTER. RU DUTCH RISER SYSTEM 01:30 - 12:00 10.50 EVAL N WAIT DECOMP CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN - WO ORDERS TO PROCEED E - CIRC DOWN IA THRU TBG ( CUT @ 9115') TAKING RETURNS UP TUBING TO FLOW LINE - CIRC EVERY HOUR © 3 BPM & 130, 2 BPM @;40 PSI FOR 5MIN. - FLOW CHECK WELL AFTER EACH CIRC. ' CUT & SLIP 75' OF DRILL LINE, INSPECT DRAW WORKS, SERVICE CROWN, PERFORM RIG MAINTENANCE & HOUSE KEEPING. SIMOPS - H2S EVAC. DRILL AND AAR 12:00 - 00:00 12.00 EVAL N DECOMP 1 CIRC WELL INTERMITTENTLY DUE TO FIELD 1 WIDE SHUT DOWN - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT @ 9115') TAKING RETURNS UP TUBING TO FLOW LINE CIRC EVERY HOUR @ 3 BPM & 130, 2 BPM @ 40 PSI FOR 5 MIN. - FLOW CHECK WELL AFTER EACH CIRC. CHANGE OUT SEAT 7 GATE ON 4" STANDPIPE VALVE, PRESSURE TEST TO 200 ■ PSI, LEAKED. REMOVE BONNET, INSTALL NEW BONNET 0-RING, PRESSURE TEST TO 200/2,500 PSI FOR 7 MINUTES. REPAIR CASING HYDRAULIC PUMP, DIG NOSE & REPAIR IRON ROUGHNECK JUNCTION BOX AIR PURGE; CREW ENVIRONMENTAL ;AWARENESS MEETING W/ NABORS SAFETY REP. PERFORM SAFETY AUDIT ON CENTRILIFT UNIT TO BE USED FOR CONTROL LINE. 1/12/2011 i 00:00 - 12:00 12.00 EVAL N WAIT DECOMP CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN, - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT @ 9115') TAKING RETURNS UP TUBING TO FLOW LINE - CIRC EVERY HOUR @ 3 BPM & 130, 2 BPM @ 40 PSI FOR 5 MIN. - FLOW CHECK WELL AFTER EACH CIRC. CONTINUE TO MAINTENANCE, CLEAN, & PAINT THROUGHOUT THE RIG. CHANGED OUT 2 BAD VALVES ON WASH DOWN PUMP WATER LINES. CHANGED OUT LEAKING 16" AIR BOOT FOR DUTCH RISER ON BOP STACK. OILED & WORKED LOCK DOWN BOLTS ON DUTCH RISER FLANGE INSPECT & MIC BEARING FOR PM ON DRAW WORKS DRUM. Printed 3/4/2011 10:38:58AM orth America 'ALAS K BP410 Page 5 of 9 - -Operation Summary Report Common Well Name: 05 -30 I AFE No _ Event Type: WORKOVER (WO) Start Date: 1/5/2011 I End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) I (ft) 12:00 - 00:00 12.00 EVAL N WAIT DECOMP CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN - WO ORDERS TO PROCEED CIRC DOWN IA THRU TBG ( CUT @ 9115') TAKING RETURNS UP TUBING TO FLOW LINE - CIRC EVERY HOUR © 3 BPM & 130, 2 BPM @4O PSIFOR5MIN. I- FLOW CHECK WELL AFTER EACH CIRC. FINISH INSPECTING & MIC BEARING FOR PM I ON DRAW WORKS DRUM. INSPECT DRAW WORKS CHAINS, CLEAN AROUND ROTARY. CLOSED 8 OUT OF 18 ITEMS ON THE I HOPKINSAUDIT. 1/13/2011 00:00 - 12:00 12.00 EVAL N WAIT DECOMP I CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN ` , - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT © 9115') TAKING RETURNS UP TUBING TO FLOW LINE - CIRC EVERY HOUR @ 3 BPM & 130, 2 BPM @ 40 PSI FOR 5 MIN. W - FLO CHECK WELL AFTER EACH CIRC. * ** *REMOVE ROTARY TABLE, CLEAN ALL - DRIP PANS AND SUMP AREAS BENEATH RIG FLOOR. INSPECT DERRICK. FUNCTION KICK DETECTION EQUIPMENT I i CONTINUE RIG MAINTENANCE. 12:00 - 00:00 12.00 EVAL N WAIT DECOMP CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT @ 9115') , TAKING RETURNS UP TUBING TO FLOW LINE - CIRC EVERY HOUR @ 3 BPM & 130, 2 BPM @40 PSI FOR 5MIN. - FLOW CHECK WELL AFTER EACH CIRC. CONTINUE WITH CLEANING, MAINTENANCE, & PAINTING. 1/14/2011 00:00 - 12:00 % 12.00 EVAL N WAIT DECOMP CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT @ 9115') TAKI N G RETURNS UP TUBING TO FLOW LINE � I 1 -CIRC EVERY HOUR @ 3 BPM & 140, 2 BPM @ 40 PSI FOR 5 MIN w/ 1% KCL. 1- FLOW CHECK WELL AFTER EACH CIRC. CLEAN & SERVICE, & PAINT AIRSLIPS, REPAIR MUSHROOMED HAMMER UNIONS IN INNER- CONNECT. I I I CONTINUE RIG MAINTENANCE Printed 3/4/2011 10:38:58AM V iorthArnerica-ALASI%- BFI- tea 6 oh 19 Operation Summary R Common Well Name: 05 -30 1AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 End Date: 1/28/2011 !X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay ! Site: PB DS 05 Rig Name /No.: NABORS 7ES I Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 00:00 12.00 EVAL N WAIT DECOMP 1 CIRC WELL INTERMITTENTLY DUE TO FIELD !WIDE SHUT DOWN - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT TAKING RETURNS UP TUBING TO F FFLOW LINE - CIRC EVERY HOUR @ 3 BPM & 140, 2 BPM @ 40 PSI FOR 5 MIN w/ 1% KCL. FLOW CHECK WELL AFTER EACH CIRC. REMOVE FROST FROM DERRICK, CLEANING, PAINT DRAW°WORKS; CHANGE OUT CHECK VALVE ON BOILER #2 1/15/2011 00:00 - 06:30 6.50 EVAL N WAIT ! DECOMP CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN ' WO ORDERS TO PROCEED - CIRC DOWN to THRU TBG ( CUT @ 9115') TAKING RETURNS-UP TUBING TO FLOW LINE j - CIRC EVERY HOUR @ 3 BPM & 140, 2 BPM @40 PSI FOR `5MIN w/ 1% KCL. - FLOW CHECK WELL AFTER EACH CIRC. CONTINUE RIG MAINTENANCE 06:30 - 07:30 1.00 BOPSUR N WAIT DECOMP DRAIN BOP STACK. PICK UP JOINT OF DRILL PIPE. PUMP TO ENSURE HANGER THREADS ARE CLEAN. DRAIN STACK. 07:30 - 09:00 1.50 BOPSUR N WAIT DECOMP PICK UP TEST TOOLS; RE -DRESS & MAKE UP BLANKING SUB TO HANGER. PRESSURE TEST TO 3,500 PSI. 09:00 15:30 6.50 BOPSUR P DECOMP , TEST BOPE - TEST BOPE AND CHOKE MANIFOLD TO 3,500 PSI HIGH AND 250 PSI LOW WITH 3 -1/2" l i l& 4 -1/2" TEST JOINT. TEST ANNULAR PREVENTER TO 3,500 PSI HIGH AND 250 PSI LOW WITH 3 -1/2" TEST JOINT. TEST Q { ACCUMULATOR UNIT. - TEST WITNESSED BY AOGCC REP CHUCK SCHEVE, TOUR PUSHER LARRY WURDEMAN, AND BP WSL BILL DECKER. * ** *MANUAL BEAN CHOKE DID NOT TEST. AOGCC INSPECTER OK'D TO PROCEED. INSPECT MANUAL BEAN CHOKE, ATTEMPT ITO RE -TEST, CHOKE WAS NOT HOLDING RIG I WATER PRESSURE. REASSEMBLE & TEST BONNET & BODY TO 1250/3,500 PSI. RIH MECHANIC IS IN PROCESS OF REPLACING STEM & SEAT. WILL NEED TO RE -TEST AND SUBMIT. 15:30 - 00:00 8.50 BOPSUR N WAIT DECOMP %CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN - WO ORDERS TO PROCEED CIRC DOWN IA THRU TBG ( CUT @ 9115') 1 TAKING RETURNS UP TUBING TO FLOW LINE - CIRC EVERY HOUR @ 3 BPM & 140, 2 BPM 1 ©40 PSI FOR 5 MIN w/ 1% KCL. FLOW CHECK WELL AFTER EACH CIRC. BLOW DOWN CHOKE & MANIFOLD. INSTALL HANDRAIL GATE AT LADDER FROM UPPER DECK TO MOTOR LEVEL. Printed 3/4/2011 10:38:58AM rtl Arnerica1 -ALASKA ESP,. Operation Summary Report Common Well Name: 05-30 I AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Firs I Task Code NPT NPT Depth Phase I Description of Operations (h - (ft) 1/16/2011 00:00 12:00 12.00 N WAIT DECOMP 12.00 EVAL CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT @ 9115') TAKING RETURNS UP TUBING TO FLOW LINE CIRC EVERY HOUR @ 3 BPM & 140, 2 BPM @, 40 PSI FOR 5 MIN w/ 1% KCL. - FLOW CHECK WELL AFTER EACH CIRC. RIO MAINTENANCE. CLEANING. PAINTING ON THE PITS, & PUMP ROOM. 12:00 - 00:00 12.00 EVAL N WAIT DECOMP CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN. WO ORDERS TO PROCEED CIRC DOWN IA THRU TBG ( CUT @ 9115') TAKING RETURNS, UP TUBING TO FLOW LINE - CIRC EVERY HOUR '@ 3 BPM & 140, 2 BPM @`40 PSI FOR 5MIN w/ 1% KCL. - FLOW CHECK WELL AFTER EACH CIRC. I I. CLEAR ICE FROM DERRICK, NEEDLE GUN ON RIG FLOOR, PAINTING, & SERVICE SKATE 1/17/2011 00:00 - 12:00 12.00 EVAL N WAIT �' DECOMP CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT @ 9115') TAKING RETURNS UP TUBING TO FLO W LINE - CIRC EVERY HOUR @ 3 BPM & 140, 2 BPM @ 40 PSI FOR 5 MIN w/ 1% KCL. - FLOW CHECK WELL AFTER EACH CIRC. SERVICE & INSPECT SKATE & CENTRIFUGE. 12:00 - 00:00 12.00 EVAL N 1 WAIT DECOMP , CIRC WELL INTERMITTENTLY DUE TO FIELD WIDE SHUT DOWN - WO ORDERS TO PROCEED - CIRC DOWN IA THRU TBG ( CUT @ 9115') TAKING RETURNS UP TUBING TO FLOW LINE CIRC EVERY HOUR @ 3 BPM & 140, 2 BPM @40 PSI FOR 5 MIN w /1 %KCL. - FLOW CHECK WELL AFTER EACH CIRC. SERVICE IRON ROUGHNECK DRIVE GEARS; CLEAN HAND TOOLS. 1/18/2011 00:00 - 12:00 12.00 EVAL N WAIT DECOMP REVERSE CIRCULATE EVERY HOUR THROUGH TUBING CUT AT 9115' MD. USING 8.4 PPG, 1 % KCL PUMP AT 2 BPM WITH 40 PSI AND 3 BPM WITH 120 PSI. FLOW CHECK WELL AND VERIFY VOLUMES EVERY CIRCULATION. TOTAL OF 143 BBLS PUMPED THIS TIME PERIOD. PERFORM RIG MAINTENANCE AND PAINTING. REPAIR } TRAVELING GEARS ON IRON ROUGHNECK. 12:00 - 00:00 12.00 EVAL N WAIT !, DECOMP I REVERSE CIRCULATE EVERY HOUR THROUGH TUBING CUT AT 9115' MD. USING 8.4 PPG, 1% KCL PUMP AT 2 BPM WITH 40 PSI AND 3 BPM WITH 120 PSI. FLOW CHECK WELL AND VERIFY VOLUMES EVERY ,CIRCULATION. TOTAL OF 169 BBLS PUMPED THIS TIME PERIOD. PERFORM RIG MAINTENANCE AND PAINTING. _ Printed 3/4/2011 10:38:58AM � e 8 of -i9 . • . ., NEf. L1 G7 s'. Operation Su mmary Report Common Well N 05 -30 AFENo Event Type: WORKOVER (WO) ! Start Date: 1/5/2011 End Date: 1/28/2011 �X4- 00PMT -E: (1,806,000.00 ) J Project: Prudhoe Bay I Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) - (ft) 1/19/2011 00:00 - 15:00 7 15.00 EVAL N WAIT DECOMP REVERSE CIRCULATE EVERY HOUR THROUGH TUBING CUT AT 9115' MD. USING 1 8.4 PPG, 1% KCL PUMP AT 2 BPM WITH 40 PSI AND 3 BPM WITH 120 PSI. FLOW CHECK WELL AND VERIFY VOLUMES EVERY CIRCULATION. TOTAL PUMPED THIS TIME PERIOD 176 BBLS. APPROVAL TO RETURN ITOWORK GIVEN BY IMTAT 13:00 HOURS. PREP FOR START UP OF OPERATIONS. 15:00 - 17:30 2.50 PULL P DECOMP PJSM. RIG UP TUBING HANDLING EQUIPMENT. LINE UP PERSONNEL AND TRUCKS. 17:30 - 18:30 1.00 PULL P j DECOMP , E_NG„ NGE TUBING HANGER. BACK OUT LOCK FA EE WITH E 8K UP. PULL B S I LADY AE 125K TO RIG FLOOR. MONITOR WELL. STATIC. BREAK AND LAY.DOWN TUBING HANGER. _ MAKE UP TOP'DRIVE. 18:30 - 21:00 2.50 PULL P DECOMP CIRCULATE BARACLEAN SWEEP SURFACE SURFACE AND DISPLACE WELLBORE WITH CLEAN 8:4 PPG, 1% KCL WATER AT 380 GPM [WITH 1030 PSI. MONITOR FLUIDS IN AND OUT II , WITH ITH N GAINS OR LOSSES. RIG DOWN CENTRALIFT EQUIPMENT WHILE CIRCULATING. 21:00 - 22:00 1.00 PULL P DECOMP WELLBORE OUT OF BALANCE. PUMP SALT I PILL. MONITOR WELLBORE. STATIC. BRINE 1 WEIGHT IN AND OUT 8.4 PPG. 22:00 - 00:00 2.00 r PULL P I DECOMP ' PJSM. PULL 4 1/2" X 3 1/2" TUBING COMPLETION FROM CUT AT 9115' MD. SPOOL TWO 1/4" CONTROL LINES AND ONE 3/8" CHEMICAL LINE. PULL TO 8705' MD. UP WEIGHT 115K, DOWN WEIGHT 100K. 1/20/2011 00:00 04:30 4.50 PULL P DECOMP PULL 4 112" X 3 1/2" COMPLETION FROM 8705' MD to 6143' MD. - PJSM WITH RIG CREW, CENTRILIFT, AND CAMCO HAND. TWO 1/4" CONTROL LINES AND ONE 3/8" CHEMICAL INJECTION LINE. - 87K LBS UP WEIGHT, 80K LBS DOWN WEIGHT. 04:30 - 05:30 1.00 PULL P DECOMP �, CHANGE HANDLING EQUIPMENT - CHANGE FROM 4 1/2" TO 3 1/2" HANDLING EQUIPMENT. - CHANGE OUT CONTROL LINE SPOOL. 05:30 - 12:00 6.50 PULL P fi DECOMP PULL AND LD 3 1/2" TUBING WITH 3/8" I CHEMICAL INJECTION LINE FROM 6143' MD I TO 3280' MD. - FOUND A 1/4" HOLE IN JT #143 —5238' MD. - NOTICEABLE CORROSION ON THE PIN END OF MOST JOINTS. Printed 3/4/2011 10:38:58AM • -*oh' Aiiiefia ALASM‘.. •P' P Operation Summaasy Common Well Name: 05 -30 I AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 1 End Date: 1/28/2011 1X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task 1 Code NPT NPT Depth Phase Description of Operations L (hr) (ft) 12:00 - 22:30 10.50 PULL P DECOMP CONTINUE TO PULL 3 1/2" TUBING WITH 3/8" CHEMICAL INJECTION LINE FROM 3280' - LD A TOTAL OF 72 JTS OF 4 1/2 ", BTC-M, L -80 TUBING. LD A TOTAL OF 178 JTS OF 3 V2 ", 8RD, L -80 ' TUBING. LD 10 JTS OF 3 1/2 ", TDS, CR -80 TUBING. LD ONE 7.56' CUT JOINT OF 3 1/2 ", TDS, CR -80 TUBING - CUT JOINT HAD A VISIBLE BULGE - 2' UP FROM CUT FROM 1ST ATTEMPTED CUT. - RECOVERED 257 CLAMPS AND 21 SS BANDS. - DROPPED ONE 9" LONG CHEMICAL LINE 'CLAMP PIN DOVVNHOLE 22:30 - 00:00 1.50 PULL P DECOMP 1 RD 3 1/2" TUBING HANDLING EQUIPMENT. 1- MONITOR WELL, WELL IS STATIC. 1 - RD TUBING HANDLING EQUIPMENT. - RD CAMCO CHEMICAL LINE SPOOLER. 1/21/2011 00:00 - 00:30 0.50 PULL P I DECOMP CONTINUE TO RD 3 1/2" TUBING HANDLING EQUIPMENT. MONITOR WELL. WELL IS STATIC. - RD TUBING HANDLING EQUIPMENT. - RD CAMCO CHEMICAL LINE SPOOLER. El CLEAN FLOOR. - INSTALL WEAR BUSHING E — — 00 01:30 1.00 FISH P DECOMP BRING 3 1/2" TUBING DRESS-OFF BHA COMPONENTS TO RIG FLOOR. 01 :30 03:00 1.50 FISH i P DECOMP MU BHA #1, 3 1/2" TUBING DRESS -OFF BHA W/ 95/8" CASING SCRAPER. - PJSM WITH RIG CREW, BAKER FISHING REP, WSL, AND NABORS TP. BHA #1 AS FOLLOWS: 8.5" X 3.563" DRESS OFF SHOE; X0 BUSHING; EXTENSION X 3; INNER TUBING DRESS OFF MILL; WASHOVER BOOT BASKET; DOUBLE PIN SUB, 95/8" CASING SCRAPER; BIT SUB W/ FLOAT; STRING MAGNET X 2; BUMPER SUB; , O IL JARS; PUMP OUT SUB W/ 1 7/8" OD DART; 4 3/4" DRILL COLLARS X 6; XO. - TOTAL LENGTH = 248.49'. 1 { - MAX OD = 8.5" -- 8.5" X 3.563" DRESS OFF SHOE - MIN ID = 1" - INNER TUBING DRESS OFF MILL -T 03:00 - 06:00 3.00 FISH P DECOMP RIH WITH BHA #1, 3 1/2" TUBING DRESS -OFF BHA W/ 95/8" CASING SCRAPER ON 4" DP FROM DERRICK TO ^6401' MD. - FILLING PIPE EVERY 30 STANDS. '- TAGGEDU P HARD AT 6401' MD. 1_ PICKED UP 150K LBS, 25K LBS OVER STRING WEIGHT, AND TRIPPED THE JARS. - STRING PULLED FREE OF OBSTRUCTION. - PU WEIGHT = 125K LBS, SO WEIGHT = 118K I LBS. Printed 3/4/2011 10:38:58AM Arnim ALASKA BP • paw to of tw 4 S 4 4 Qperatio Summary Report z Common Well Name: 05 -30 AFE No Event Type: WORKOVER (WO) I Start Date: 1/5/2011 End Date: 1/28/2011 ;X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 ©73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 07:00 1.00 FISH P DECOMP ATTEMPT TO WORK THROUGH TIGHT SPOT 11N 95/8" CASING AT 6401' MD. - PU AND ESTABLISH PARAMETERS. - BEGIN PUMPING AT 320 GPM, 900 PSI. - PU WEIGHT = 125K LBS, SO WEIGHT = 120K LBS. - ROTATING AT 20 RPM, ROT WEIGHT = 123K LBS, TORQUE = 2K FT -LBS. - ATTEMPT TO REAM DOWN THROUGH TIGHT SPOT AT 6401'. - TORQUE INCREASED AND TD STALLED OUT. 07:00 - 08:30 1.50 FISH P DECOMP CIRCULATE AND RECIPROCATE WHILE EVALUATING: TIGHT SPOT. `- PUMPED 998 BBLS OF 8.5 PPG SEAWATER. PU WEIGHT =125 -- 125K LBS, SO WEIGHT = - 1 120K LBS. - MONITOR WELL FOR 5 MINUTES. WELL IS STATIC. PUMPED A DRY JOB AND PREPARED TO P0H. 08:30 - 10:30 2.00 j FISH C DECOMP POH WITH BHA #1, 3 1/2" TUBING DRESS OFF BHA. - FROM 6401' MD TO 248' MD. 10:30 12:00 1.50 FISH C DECOMP POH AND LD BHA #1, 3 1/2" TUBING DRESS OFF BHA WITH 95/8" CASING SCRAPER. - PJSM PRIOR TO LAYING DOWN BHA WITH RIG CREW. - EXAMINED DRESS OFF SHOE. - DRESS OFF SHOE HAD -2" SECTION ON OD THAT HAD BEEN DAMAGED. - DAMAGE TO DRESS OFF SHOE INDICATED THAT OBSTRUCTION WAS COLLAPSED CASING - PHOTOS OF DAMAGED SHOE WERE SENT TO ANCHORAGE ENGINEERS. 12:00 - 14:00 2.00 FISH C DECOMP I DISCUSSIONS WITH ANCHORAGE ENGINEERS ON NEXT COURSE OF ACTION. DECISION WAS MADE TO RIH WITH SLICKLINE AND RUN A CALIPER LOG. 1- RIG CREW CLEANED AND CLEAR RIG FLOOR. - FUNCTION TESTED RAMS. 14:00 - 16:00 2.00 EVAL C DECOMP MOBILZE SLICK LINE UNIT TO PERFORM CALIPER LOG OF TIGHT SPOT AT 6401' MD. - RU DUTCH RISER TO STACK AND RUN IN LOCK DOWNS. - 16:00 - 19:00 3.00 ! EVAL X SFAL DECOMP ! UNABLE TO SPOT SLICKLINE UNIT DUE TO MECHANICAL PROBLEMS WITH TRUCK. - HELD PJSM WITH SLICKLINE CREW. SLICK LINE TRACTOR HAD MECHANICAL PROBLEMS. - WAITING FOR SLICKLINE MECHANIC TO TROUBLESHOOT AND FIX PROBLEM. OA OPENED AT 17:00 HRS - NO PRESSURE PRESENT. - MONITOR OA EVERY HOUR AND VERIFY NO PRESSURE AND NO FLOW IN PREPERATION FOR CASING PACKOFF CHANGE. Printed 3/4/2011 10:38:58AM =. •4orth A iertca - ALASKA BP • Operation Summaryw Report Common Well Name: 05 -30 AFE No Event Type: WORKOVER (WO) I Start Date: 1/5/2011 End Date: 1/28/2011 X4- OOPMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 19:00 - 21:30 2.50 EVAL C DECOMP RU SCHLUMBERGER SLCKLINE UNIT TO RIH WITH A 3" DRIFT. - PJSM WITH RIG CREW, SLICKLINE CREW, RIG WSL, SLICKLINE WSL, AND NABORS TP. RU SLICKLINE SHEAVES AND PULL 1 SLICKLINE TO FLOOR. -PU AND MU TOOLS TO RUN A 3" OD DRIFT `TO 9100' MD. 21:30 - 22:30 1.00 EVAL C DECOMP :RIH WITH 3" DRIFT ON SLICKLINE TO 9100' MD. - CASING DRIFTED CLEAR WITH 3" OD DRIFT IN PREPERATION FOR CALIPER RUN. 22:30 - 23:30 1.00 EVAL C DECOMP POH WITH 3" DRIFT ON SLICKLINE FROM 19100' MD TO SURFACE. 23:30 - 00:00 0.50 EVAL C DECOMP IRIH WITH PDS 40 ARM CALIPER TOOL ON " SCHLUMBERGER SLICKLINE. RIH TO 9100' AND "PREPARE TO LOG UP TO 6000' MD. - 1/22/2011 1 00:00 03:30 ! 3.50 EVAL C DECOMP RIH AND LOG FROM 9100' MD TO 6000' MD WITH PDS 40 ARM CALIPER LOG. - CALIPER LOG INDICATED DAMAGE TO CASING FROM 9024' TO 8990'. FROM 6414' TO 6411'. - LOG SENT TO HOUSTON F R ANALYSIS AND THEN EMAILED TO ANCHORAGE ENGINEERS. CONTINUE TO MONITOR OA EVERY HOUR FOR PACK -OFF REPLACEMENT. NO 03 :30 - 04:30 1.00 EVAL C DECOMP PRESSURE, NO FLOW. . � RD SLICKLINE UNIT AND DUTCH RISER. 04:30 - 08:00 3.50 FISH C DECOMP RIH WITH MULE SHOE ON 4" DP FROM DERRICK. - RIH TO 8558' MD. - PU WEIGHT = 142K LBS, SO WEIGHT = 137K !LBS. 08:00 - 10:00 j 2.00 FISH P DECOMP !PU AND SET HES 9 5/8" R S STORM I PACKER FOR CASING PAC -OFF REPLACEMENT. - PJSM WITH RIG CREW AN 1 HES PACKER REP. PU AND MU 95/8" RTTS AI'D A SINGLE JT ! OF DP. 1 - RIH AND SET RTTS —36' BLOW ROTARY TABLE. 1 - ATTEMPT TO TEST RTTS TO 1000 PSI FROM ABOVE. - GLAND NUTS ON TUBING SPOOL LEAKED. - BLEED OFF PRESSURE AND TIGHTEN GLAND NUTS. - TEST RTTS TO 1000 PSI FROM ABOVE FOR 10 CHARTED MINUTES; GOOD TEST. YH R T R OA EVERY HOUR TO MONITOR CONTINUE O MONI FOR PACK -OFF REPLACEMENT. NO PRESSURE, NO FLOW. 10:00 - 11:00 1.00 r BOPSUR P DECOMP RU TO TEST BOPE. Printed 3/4/2011 10:38:58AM Manta =- ALASKA : BP`` Pa 12 of Operation SIIrnrriary Report, Common Well Name: 05 -30 I AFE No Event Type: WORKOVER (WO) ( Start Date: 1/5/2011 End Date: 1/28/2011 !X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ! Phase Description of Operations (hr) (ft) 11:00 - 16:30 5.50 BOPSUR P DECOMP TEST BOPE AND CHOKE MANIFOLD, MONITORING AN OPEN OA. - TESTING PERFORMED IN ACCORDANCE WITH AOGCC REGS AND BP ADWOP. - LOU GRIMALDI W/ AOGCC WAIVED TEST WITNESS AT 1400 HRS ON 1/20/2011. -TEST TO 250 PSI LOW, 3500 PSI HIGH. 1 - TEST UPPER AND LOWER PIPE RAMS WITH D 4" AND 4.5" TEST JOINT. Q 0 TEST ANNULAR PREVENTER WITH 4" TEST r 1 _ JOINT. 4 1- TEST ACCUMULATOR. - 200PSIAT19SEC,3000PSIAT89 SEC. - 5 BOTTLES @1900 PSI. - CHOKE LINE HCR FAILED. REPLACEMENT 1 HCR LOCATED. 16:30 - 19:00 2.50 BOPSUR P DECOMP ND BOPE AND SPOOL AND STAND BACK - PJSM WITH RIG CREW AND FMC HANDS. 19:00 - 20:00 1.00 WHSUR P DECOMP ; PULL 95/8" CASING PACK -OFF AND INSTALL A NEW PACK -OFF. PJSM WITH RIG CREW AND FMC HANDS. I- PULL 95/8" CASING PACK -OFF. - SET NEW 95/8" CASING PACK -OFF. - RILDS_ 20 :00 - 22:00 2.00 BOPSUR P DECOMP I NU BOPE AND TUBING SPOOL TO WELLHEAD. - PJSM WITH RIG CREW AND FMC HANDS. 22:00 - 23:30 1.50 WHSUR P DECOMP I PRESSURE TEST 95/8" CASING PACK -OFF TO 5000 PSI FOR 30 CHARTED MINUTES. - DIFFICULTY GETTING A GOOD TEST DUE TO SMALL FLUID VOLUME AND EXTREMELY COLD TEMERATURES. - PASSING TEST WAS ACHIEVED. 23:30 - 00:00 0.50 BOPSUR N RREP DECOMP RU TO CHANGE OUT CHOKE LINE HCR. - PJSM. 1/23/2011 00:00 - 06:00 l 6.00 BOPSUR N RREP DECOMP REMOVE AND REPLACE THE HCR ON THE CHOKE LINE FROM THE BOP STACK. 06:00 - 06:30 0.50 BOPSUR N RREP DECOMP NU BOPE - INSTALL TURNBUCKLES. - INSTALL BELL NIPPLE. 06:30 - 07:30 1.00 BOPSUR N RREP DECOMP I PU TESTING TOOLS AND RU TO FINISH TESTING ROPE. 07:30 - 08:00 0.50 BOPSUR P DECOMP I FINISH TESTING BOPE PER AOGCC REGS AND BP ADWOP. - TEST REPLACED HCR TO 250 PSI LOW AND 3500 PSI HIGH. - TEST BLIND SHEAR RAMS TO 250 PSI LOW I AND 3500 PSI HIGH. - TEST CHOKE VALVES 12 AND 13 TO 250 PSI LOW AND 3500 PSI HIGH. 08:00 - 08:30 0.50 BOPSUR ! P DECOMP INSTALL WEAR RING. - LD BOPE TEST TOOLS - RD BOPE TEST EQUIPMENT. Printed 3/4/2011 10:38:58AM Amer - ALASKA B' 0 Pam 13 Operation Summary Report Common Well Name: 05 -30 I AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 I End Date: 1/28/2011 1X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 I Rig Name /No.: NABORS 7ES Spud Date/Time: ■ Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. ' UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date I From - To 1 Hrs Task I Code ■ NPT I NPT Depth I Phase I Description of Operations (hr) (ft) I 08:30 - 09:30 1.00 DHB 1 DECOMP I PICK UP SINGLE JOINT OF 4" DP AND RIH TO 1 1 HE 1 RIEVE HES RTTS STCS PJSM WITH RIG CREW AND HES REPRESENTATIVE. I- ENGAGE AND RELEASE RTTS PER HES I REPRESENTATIVE. - PU WEIGHT = 145K LBS. 1 - - POH AND LD RTTS AND SINGLE JOINT OF 4" DP. 09:30 - 10:00 0.50 FISH C DECOMP RIH WITH MULE SHOE ON 4" DP FROM DERRICK FROM 8558' TO 9103' MD. - TAG a.5" TUBING STUB. 1 - PU WEIGHT = 150K LBS, SO WEIGHT = 143K , LBS. 10:00 14:00 4.00 FISH C DECOMP CIRCULATE IiOLE•CLEAN AND DISPLACE TO 1 I 9.8 .8 PPG BRINE. PJSM WITH RIG CREW, CH2MHILL TRUCK DRIVERS,' AND MUD ENGINEER. - DISPLACE WELL TO 9.8 PPG BRINE AT 290 GPM (7 BPM) AND 690 PSI. I ' _,THE EPOCH STROKE COUNTER FAILED DURING DISPLACEMENT * *. - INCREASED PUMP RATE TO 500 GPM (12 I BPM) AND 1900 PSI. 1 NOTED SOME SCALE IN RETURNS. VERIFIED 9.8 PPG ALL THE WAY AROUND. i - MONITORED WELL; WELL WAS STATIC. I ** NOTIFIED NS SUPERINTENDENT OF STROKE COUNTER ISSUE. USED MANUAL STRAP OF PITS AND STROKE COUNTER ON SUPERCHOKE PANEL TO ENSURE BBL IN / I BBL OUT FOR DISPLACEMENT. RESET EPOCH AFTER DISPLACEMENT AND STROKE COUNTER BEGAN WORKING AGAIN. ** 14:00 - 18:30 1 4.50 FISH i C DECOMP POH FROM 9100', STANDING BACK 4" DP IN 1 DERRICK. I __ 1 - LD MULESHOE. - Printed 3/4/2011 10:38:58AM I4t Operation Summary Report Common Well Name: 05 -30 AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (h (ft) 18:30 - 20:30 2.00 FISH C DECOMP PU BHA #2, 8.5' SLICK OD STRING MILL ASS'Y. PJSM WITH RIG CREW AND BAKER FISHING ! HAND. PU AND MU BI-IA #2, STRING MILL ASS'Y AS FOLLOWS: - BULLNOSE - PIN X PIN SUB - 8.F SLICK OD SPIRAL BLADED STRING MILL - BOOT BASKETS X 2 -BIT SUB - FLOAT SUB WITH FLOAT - STRING MAGNET X 2 - 6.25" BUMPER SUB - 6.25" OIL JAR _ - 6.25" DRILL COLLARS X 9 - XO TO DP., MAX OD = 8.5" SLICK OD SPIRAL BLADED STRING MILL. - [ MIN ID = 0" (FLOAT INSTALLED IN FLOAT f SUB). _TOTAL OVERAL LENGHT = 339.34' 20:30 - 23:00 2.50 °' _ ! FISH C DECOMP RIH WITH BHA #2, STRING MILL ASS'Y, ON 4" DP FROM DERRICK. - FILL PIPE EVERY 25 STANDS. - ENCOUNTERED A TIGHT SPOT AT -5525' i MD. - SET DOWN — 30K LBS. -PU15 T O TD. AND RU BLOWER HOSE 23:00 - 00:00 1.00 FISH C DECOMP ESTABLISHED MILLING PARAMETERS AND MILL OUT TIGHT SPOT AT 5525'. - 425 GPM (10 BPM) AND 1050 PSI. - 80 RPM AND — 2.6K FT -LBS OFF BOTTOM TORQUE. - PU WEIGHT = 123K LBS, SO WEIGHT = 120K LBS, ROT WEIGHT = 123K LBS. - OBTAIN SLOW PUMP RATES. BEGAN MILLING OBSTRUCTION FROM — 5523' I TO 5530' MD. - WOB = 1 -2K LBS, TORQUE = 3 -8K LBS. - THROUGH OBSTRUCTION AT 5530' MD. - WORKED SECTION SEVERAL TIMES UNTIL IT CLEANED UP. Printed 3/4/2011 10:38:58AM # America ' /"{L S B f 4 page 5 VF #ELF Y g 9 Opera�tio Summary Repast Common Well Name: 05 -30 AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. 1 UWI: Active Datum: 05 -30 ©73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/24/2011 00:00 - 04:30 4.50 FISH C DECOMP CONTINUE TO RIH WITH BHA #2, 8.5" OD STRING MILL ASS'Y. - RIH AND CLEAN UP TIGHT SPOTS. - ESTABLISHED MILLING PARAMETERS - 425 GPM (10 BPM) AND 1050 PSI. 80 TO 100 RPM AND - 2.6 -3.4K FT -LBS OFF BOTTOM TORQUE. PU WEIGHT = 123K LBS, SO WEIGHT = 120K LBS, ROT WEIGHT = 123K LBS. ENCOUNTER AND MILLED CLEAN TIGHT SPOTS AT :. -6401' T06403' - 420 GPM (10 BPM) AND 1130 PSI. 100 RPM AND 3.5 -6K FT -LBS TORQUE - PU WEIGHT = 133KLBS, SO WEIGHT = 125K LBS, ROT WEIGHT = 130K LBS. 6785' TO 6787' 420 GPM (10 BPM) AND 1190 PSI. 100 RPM AND 3.5-6K FT -LBS TORQUE PU WEIGHT = 143K LBS, SO WEIGHT = 128K LBS, ROT WEIGHT = 135K LBS. — 6916' TO 6918' - 420 GPM (10 BPM) AND 1190 PSI. - 100 RPM AND 3.5 -6K FT -LBS TORQUE - PU WEIGHT = 143K LBS, SO WEIGHT = 128K LBS, ROT WEIGHT = 135K LBS. RIH FROM 6918' TO 9081' - WASH DOWN TO TUBING STUB 9103'. 5 PSI. S BPM AND 450 1- NO TIGHT SPOTS OR OBSTRUCTIONS NOTED. 04:30 - 07:30 3.00 FISH C DECOMP (CIRCULATE HOLE CLEAN - PUMP 617 BBLS. - 490 GPM (12 BPM) AT 2000 PSI. - PUMP 45 BBL HIGH -VIS SWEEP. - CHASE SWEEP WITH 692 BBLS - 490 GPM (12 BPM) AT 1986 PSI. - PUMP 548 BBLS. - 490 GPM (12 BPM) AT 1986 PSI - ROTATING AND RECIPROCATING - 100 RPM AND 6K FT -LBS TORQUE. - PU WEIGHT = 175K LBS, SO WEIGHT = 145K LBS - ROT WEIGHT = 155K LBS. ;CIRCULATIONS BROUGHT SCALE AND SOME f j ' METAL SHAVINGS TO SURFACE. 07:30 - 11:00 3.50 FISH DECOMP I POH WITH BHA #2, 8.5" OD STRING MILL ASS'Y. - PJSM. j- MONITOR WELL; WELL IS STATIC. 11:00 - 13:00 2.00 FISH C DECOMP LD BHA #2, 8.5" OD STRING MILL ASS'Y. - PJSM. - CLEAN OUT BOOT BASKETS. - RECOVERED (2) SS BANDS AND PIPE SCALE. - CLEAN AND CLEAR RIG FLOOR. - FUNCTION RAMS. Printed 3/4/2011 10:38:58AM 4 h AraeitcP ALASKA , „ F of Operation Summary Report C ommon Well Name: 05 -30 AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay I Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) I (ft) 13:00 - 14:00 1.00 FISH C DECOMP f PRESSURE TEST 95/8" CASING TO 3000 PSI FOR 30 CHARTED MINUTES. - 31 PSI DROP IN THE FIRST 15 MINUTES. - 0 PSI DROP IN THE SECOND 15 MINUTES. ----- -. - - -- — - - -- -- - - - -- 14:00 - 15:00 1.00 FISH C DECOMP PU BHA #3, 3.5" TUBING DRESS -OFF ASS'Y. -PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. M U BHA #3 AS FOLLOWS: I . -.CUT -LIP DRESS -OFF SHOE - XO BUSHING - WASHPIPE EXTENSION X 3 - INNER TUBING DRESS -OFF MILL - WASHOVER BOOT BASKET I I - DOUBLE PIN SUB - 95/8" CASING SCRAPER - BIT SUB - - FLOAT SUB W/ FLOAT - STRING 'MAGNET X 2 - BUMPER SUB - 61/4" DRILL COLLARS X 9 1 - XO TO DP. MAX OD = 8.5" CUT -LIP DRESS -OFF SHOE. MIN ID = 0" (FLOAT INSTALLED IN FLOAT ;;SUB). TOTAL OVERALL LENGHT = 338.08' 20:00 5.00 FISH 15:00 - S H �C DECOMP RIH WITH BHA #3, 3.5" TUBING DRESS-OFF I ASS'Y, ON 4" DP FROM DERRICK TO 6401'. 20:00 - 21:30 1.50 FISH P r DECOMP rRIH WITH BHA #3, 3.5" TUBING DRESS -OFF ASS'Y, ON 4" DP FROM DERRICK. - FROM 6401' TO 8525' DPM. 21:30 22:00 j 0.50 FISH N RREP 8 DECOMP CANRIG DEPTH RECORDER DE -CODER FAILED ON DRAWWORKS. - TROUBLESHOOT AND CALL OUT CANRIG TECH. 22 :00 - 22:30 0.50 FISH P DECOMP RIH WITH BHA #3, 3.5" TUBING DRESS -OFF ASS'Y, ON 4" DP FROM DERRICK. - TAG TUBING STUB AT 9103' DPM. - PU WEIGHT = 170K LBS, SO WEIGHT = 148K ;LBS. 22:30 - 00:00 1.50 FISH P DECOMP DRESS -OFF 3.5" TUBING STUB AT 9103'. - PU AND ESTABLISH MILLING PARAMETERS. - 40 RPM AND 3.5K FT -LBS OFF BOTTOM TORQUE. - PU WEIGHT = 170K LBS, SO WEIGHT = 1148K LBS. - ROT WEIGHT = 160K LBS. - 336 GPM (8 BPM) AND 1080 PSI. - DRESS -OFF TUBING STUB PER BAKER FISHING REP. I I - WOB = 1K LBS, 6K FT -LBS TORQUE. - SWALLOW 17' TO INNER MILL. - 380 PSI INCREASE. - WOB = 5K LBS. - WORK MILL AND MILL —1' OFF TUBING. I EASE BACK - PU OFF OF TUBING STUB DOWN ON STUB SEVERAL TIMES. - MONITOR WELL; WELL IS STATIC. Printed 3/4/2011 10:38:58AM fi rth America`„ ALASKA - • , 0 BP # / I Operation Summary Re Common Well Name: 05 -30 AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 1 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: ; Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. I UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations I (hr) (ft) 1/25/2011 00:00 - 02:30 2.50 FISH P DECOMP CIRCULATE WELLBORE CLEAN. 1- PUMP 450 GPM (11 BPM) AND 1965 PSI. I- PUMP 45 BBL HIGH -VIS SWEEP. tSCALE AND SOME METAL SHAVINGS j ' BROUGHT BACK TO SURFACE. CANRIG DEPTH RECORDER DE -CODER ON iI W DRAWORKS REPAIRED AND CALIBRATED. I I** MW IN g.8 PPG, MW OUT 9.8 PPG** 02:30 - 06:00 3.50 FISH P ± DECOMP T POH WITH BHA #3, - 3.5" TUBING DRESS -OFF ASS'Y, STANDING BACK DP IN DERRICK. 06:00 - 09:00 3.00 FISH P DECOMP I LD BHA #3 - CONFIRM INNER DRESS LANDED. ■ - RECOVER 1/4 SS. BAND AND 1 CLAMP PIN 109:00 - 11:00 2.00 FISH P DECOMP PU BHA #4 , { 18-1/8" CUT LIP SHOE X -0 BUSHING i EXTENSION SHEAR PIN GUIDE ASSY . 14 JNTS 2-1/16" CS HYDRIL TBG 1X-0 LBS 1 JARS PUMP OUT SUB It X -O 11:00 - 16:00 5.00 FISH P DECOMP ' TRIP IN HOLE W/ BHA #4 158' TO 9088' MD - PUW 154K, SOW 137K 16:00 - 17:00 1.00 FISH P DECOMP CIRC AND COND ESTABLISH PARAMETERS 1.0 BPM = 575 PSI -10 RPM =3KTQ ■ '; TAG TBG STUMP @ 9104' MD, TAG PLUG @ 19182' MD j - PU TO CONFIRM FISH ON W/ 20K OVER PULL 1 - POOH ABOVE TBG STUMP & MONITOR 1 WELL FOR 15 MIN. WELL STATIC ** KICK WHILE DRILLING (D2) DRILL ** 17:00 - 19:30 2.50 j FISH P DECOMP 1 DISPLACE 9.8 PPG BRINE WITH 8.4 SEAWATER - DROP 1 -7/8" DART i l - OPEN CIRC SUB @ 2060 PSI - DISPLACE @ 400 GPM, 1470 PSI - MONITOR WELL - WELL STATIC ** MW IN 8.4 PPG, MW OUT 8.4 PPG ** 19:30 - 00:00 I DECOMP LAY DOWN DP 9080' TO 2688' MD � 4.50 FISH P 1/26/2011 100:00 - 00:30 0.50 FISH P DECOMP 1LD DP 2688' TO 1748' MD. 100:30 - 01:30 1.00 FISH P 1 DECOMP SLIP & CUT DRILL LINE 01 :30 - 02:00 0.50 FISH P DECOMP SERVICE TOP DRIVE I 1 - INSPECT BRAKES - SERVICE BLOCKS AND CROWN 1 02:00 03:00 1.00 FISH � P DECOMP 1 LD DP 1748' TO 158' 03:00 - 04:30 1.50 FISH P DECOMP ' LD BHA # 4 - DID NOT RECOVER FISH Printed 3/4/2011 10:38:58AM S P • >, . of i .. Operation Summary = Report Common Well Name: 05 -30 l AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 End Date: 1/28/2011 X4- 00PMT -E: (1,806,000.00 ) Project: Prudhoe Bay I Site: PB DS 05 ■ Rig Name /No.: NABORS 7ES I Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. I UWI: Active Datum: 05 -30 @73.00ft (above Mean Sea Level) Date I From - To Hrs Task Code I NPT NPT Depth Phase Description of Operations 1 (hr) (ft) 04:30 - 07:00 2.50 RUNCOM P j RUNCMP RU TO RUN 4.5" COMPLETION I 1- PULL WEAR BUSHING '- MAKE DUMMY RUN WITH TBG HANGER i L___ - RU CSG TOOLS 07:00 - 08:00 ! 1.00 RUNCOM ; P RUNCMP W/O ORDERS 08.00 - 20:00 12.00 — j RUNCOM P RUNCMP RUN 4.5" 12.6 # /FT,13CR 85 VAM TOP TBG I- TQ TURN MAKE UP AT 4440 PSI - PUW 125K SOW 118K ABOVE FISH ` RAN 212JNTS I I -EOT= 9113' - GOOD INDICATION ON BOTH SHEER PINS ; - TAG NO GO 20:00 - 21:00 1.00 RUNCOM P RUNCMP SPACE OUT WITH 9.71.' PUP - OVERSHOT HAD 9' OF, SWALLOW WITH 4' 1 10F P1CK UP , I- LAND ON HANGER 21:00 - 00:00 3.00 RUNCOM P RUNCMP REV CRC COMPLETION FLUID - PUMP 140 BBLS CLEAN SEAWATER - PUMP 300 BBLS INHIBITED SEAWATER - PUMP 187 BBLS CLEAN SEAWATER 3 BPM @ 980 PSI _ 1/27/2011 00:00 - 01:00 1.00 RUNCOM P RUNCMP CONT REV CIRC COMPLETION FLUID -3 BPM @980 PSI I - PUMP 5 BBL DOWN TBG TO ENSURE BALL SEAT IS CLEAN 01:00 - 03:00 2.00 RUNCOM P RUNCMP :SET HALLIBURTON TNT PACKER & TEST 1 - DROP BALL ROD AND LAND ON RHC PLUG IN BTM XN NIPPLE I - PRESS UP ON TBG - BEGAN TO SET PKR AT 2050 PSI - CONT TO PRESS UP ON TBG TO 3500 PSI 1 FOR 30 MIN - 1ST 15 MIN LOST 61 PSI, 2ND 15 MIN LOST 27 PSI - BLEED PRESS OFF TO 1500 PSI & HOLD 1 - PRESS TEST IA TO 3500 PSI FOR 30 MIN 2 1 ST 15 MIN LOST 40 PSI, 2ND 15 MIN LOST 1 15 PSI BLEED OFF IA TO ZERO PSI, THEN BLEED ■ TBG TO ZERO PSI - PRESS UP ON IA TO 2450 TO SHEER DCR 1 I VALVE IN GLM #3 - PUMP BOTH WAYS THRU DCR © 3 BPM - TBG 350 PSI @ 3 BPM, ANN 600 PSI © 3 BPM_ 03:00 04:30 I 1.50 BOPSUR P I RUNCMP , INSTALL TWC & TEST - PRESS TEST TO 250 PSI LOW & 3500 PSI , , HIGH FOR 5 MIN EACH FROM ABOVE I - PRESS TEST TO 250 PSI LOW & 1000 PSI HIGH FOR 5 MIN EACH FROM BELOW 1 04:30 - 05 :30 1.00 I BOPSUR !, P RUNCMP ! ND BOPS I 1 BREAK DOWN ALL LINES TO BOP AND PITS. I I 1 - SUCK DOWN STACK FROM ABOVE ! 05:30 - 09:00 3.50 BOPSUR P RUNCMP I ND BOPS I - REMOVE CHOKE HOSE - RACK BACK STACK 1 ' - ■ ND SPACER SPOOL & DSA Printed 3/4/2011 10:38:58AM it America - ALASKA BP ., Page t9 of IS Operation Summary Report Common Well Name: 05 -30 1 AFE No Event Type: WORKOVER (WO) Start Date: 1/5/2011 I End Date: 1/28/2011 X4- OOPMT -E: (1,806,000.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name /No.: NABORS 7ES Spud Date/Time: Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 05 -30 ©73.00ft (above Mean Sea Level) Date I From - To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) ! — (ft) 09:00 - 13:00 4.00 t WHSUR P RUNCMP 1 NU TREE &ADAPTER FLANGE - PRESS TEST VOID 250 PSI LOW & 5000 PSI HIGH FOR 5 MIN EACH - PRESS TEST TREE 250 PSI LOW & 5000 PSI HIGH FOR 5 MIN EACH 13:00 - 13:30 0.50 WHSUR P RUNCMP PRE JOB SAFETY MTG W/ DSM - INSTALL LUBRICATOR & TEST 13:30 - 14:00 0.50 WHSUR P ; RUNCMP ( INSTALL LUBRICATOR & PRESS TEST. REMOVE -TWC - PRESS TEST LUBRICATOR 250 PSI LOW & 3000 PSI HIGH FOR 5 MIN EACH - PULL TWC 114:00 16:00 2.00 WHSUR P RUNCMP 4INSTALL BPV & TEST BPV FROM BELOW 1- 250 PSI LOW & 1000 PSI HIGH FOR 10 MIN EACH 16:00 - 18:30 2.50 WHSUR P T ' RUNCMP ND TREE AND ADAPTOR FLANGE NEED TO RE- ORIENT DUE TO FLOW LINE ALIGNMENT - HAD TO BREAK TREE IN ORDER TO GET VALVES TO LINE UP ■ 18:30 - 21:30 3.00 WHSUR P 1 RUNCMP NU TREE AND ADAPTOR FLANGE - PRESS TEST VOID 250 PSI LOW & 5000 PSI ` I HIGH FOR 5 MIN EACH 21:30 - - 00:00 2.50 WHSUR P RUNCMP PRESS TEST TREE TO ADAPTOR FLANGE - PRESS TEST LITTLE RED LINES TO 4000 PSI 1- MU LUBRICATOR TO TREE - PRESS UP IA TO 3500 PSI - PRESS TEST LUB. AND TREE TO 250 PSI 1 LOW & 3500 PSI HIGH FOR 5 MIN EACH OFF IA & TBG - BLEED O 1/28/2011 00:00 03:00 3.00 WHSUR P RUNCMP I PULL BPV. I PRESS TEST LUBRICATOR 250 PSI LOW & 3500 PSI HIGH FOR 5 MIN EACH INSTALL TWC I PRESS TEST TREE 250 PSI LOW & 5000 PSI H t HIGH FOR 5 MIN EACH PULL TWC 1 RD LUBRICATOR 03:00 - 07:00 4.00 WHSUR P RUNCMP CIRC FREEZE PROTECT RU LRS CIRC 140 BBLS 80 DEG. F DIESEL - 1.5 BPM = 450 PSI, 2.0 BPM = 500 PSI -SWAP LINES AND ALLOW TO U TUBE - RD CIRC LINES 107:00 -- - - - - - -- - 08:30 1.50 WHSUR P RUNCMP I INSTALL LUBRICATOR & TEST - PRESS TEST LUBRICATOR 250 PSI LOW & 3500 PSI HIGH FOR 5 MIN EACH - - INSTALL BPV 1 08:30 09:30 1.00 WHSUR P RUNCMP I TEST BPV - PRESS TEST BPV FROM BELOW 250 PSI I LOW FOR 5 MIN & 1000 PSI HIGH FOR 10 MIN 09:30 - 10 :00 0.50 WHSUR P RUNCMP RD DSM LUBRICATOR 10:00 - 12:00 2.00 WHSUR P RUNCMP PREP CELLAR & WELLHEAD - REMOVE SECONDARY ANN. VALVES & INSTALL BLANK FLANGE I 1** RIG RELEASED © 12:00 FIRS Printed 3/4/2011 10:38:58AM 05 -30 RWO (PTD 1911150) API 5029- 22213 -00 Page 1 of 2 • II � Schwartz, Guy L (DOA) From: Bjork, David [David.Bjork @bp.com] Sent: Monday, January 24, 2011 4:04 PM To: Schwartz, Guy L (DOA) Cc: Barker, Elizabeth R (SAIC); Stewman, Sondra D; Reem, David C; Smart, John C; Sarber, Greg J Subject: RE: 05 -30 RWO (PTD 1911150) API 50- 029 - 22213 -00 Guy, The caliper indicated some restrictions at the casing connections around - 6,400ft. The restrictions were successfully milled out and the casing pressure tested 3,000 -psi for 30 charted minutes. We will revert back to the original plan and run new tubing. The casing will again be pressure tested after setting the new production packer. Thank you for the help and consideration while we were performing diagnostic work and formulating a plan forward. Regards, Dave Bjork 5UANAIED FEB G1 2()11 564 -5683 440 -0331 From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Friday, January 21, 2011 4:11 PM To: Bjork, David Cc: Barker, Elizabeth R (SAIC); Stewman, Sondra D; Reem, David C; Smart, John C; Sarber, Greg J Subject: RE: 05 -30 RWO (PTD 1911150) API 50- 029 - 22213 -00 Dave, You have verbal approval to install a 7" scab liner as detailed in the schematic... Email me the updated scope of work once you have the caliper survey data and submit a 403 sundry as soon as possible on Monday. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Bjork, David [mailto:David.Bjork @bp.com] Sent: Friday, January 21, 2011 4:00 PM To: Schwartz, Guy L (DOA) ( ) r Greg Cc: Barker, Elizabeth R (SAIC); Stewman, Sondra D; Reem, David C; Smart, John C; Sarber, J Subject: 05 -30 RWO (PTD 1911150) API 50- 029 - 22213 -00 Guy, As we discussed this afternoon, we currently have Nabors 7ES over 05 -30 for a RWO. The original scope of 1/24/2011 05 -30 RWO (PTD 1911150) API 5429- 22213 -00 Page 2 of 2 work was a tubing swap and casing pack -off change -out. While running in the hole with the dress -off assembly we encountered a tight spot in the 9 -5/8" casing around 6,400ft. Judging from the marks on the dress off assembly it appears we have some collapsed casing. We will run a PDS 40 ARM caliper to evaluate. More than likely we will end up installing a 7" scab liner to cover up the casing damage at 6,400'. Here is a proposed drawing. I will send a scope of work when I get it completed. We would like verbal approval to proceed with the formal paperwork to follow Monday. Please call me if you have any questions. Regards, Dave Bjork 564 -5683 440 -0331 «05 -30 RWO Proposed Rev1.ZIP» 1/24/2011 Schlumberger NO. 4306 Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage. AK 99503-2838 A TTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Gomm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 I q¡ -116 6CANNED JUN'~ 1 2007 Field: Prudhoe Bay D B CI CD Well Job# Log Description : ate L o or L3-12 11695062 PRODUCTION PROFILE 06/06/07 . .... :,,~,o; 1 GNI-03 11637128 PRESS/TEMP SURVEY 06/06/07 1 Y-11C 11661151 MEMORY INJECTION PROFILE 06/01/07 1 C-31B 11745223 MEMORY PROD PROFILE 05/31/07 1 05-30 11801067 LDL 06/01/07 1 13-29L 1 11686753 LDL OS/28/07 1 Y -05A 11628778 MEMORY INJECTION PROFILE OS/28/07 1 L5-23 11661153 MEMORY PROD PROFILE 06/05/07 1 H-37A 11594506 PPROF/IPROF 06/05/07 1 Y-35A 11661152 MEMORY PROD PROFILE 06/03/07 1 N-15 11637129 PRODUCTION PROFILE 06/13/07 1 01-07A 11626098 PRODUCTION PROFILE OS/28/07 1 13-29L 1 11686753 LDL OS/28/07 1 04-24 11773112 PRODUCTION LOG 05/19/07 1 12-19 11637343 LDL 06/13/07 1 G-23A 11638639 LDL 06/03/07 1 14-05A 11813055 PPROF W/RST BORAX 06/11/07 1 K-12A 11745224 MEMORY PROD PROFILE 06/02/07 1 P2-19A 11661154 MEMORY PROD PROFILE 06/06/07 1 Z-29 11686758 PRODUCTION PROFILE 06/15/07 1 3-41/K-39 11813054 INJECTION PROFILE 06/08/07 1 3-41/K-39 11813054 INJECTION PROFILE 06/09/07 1 Z-29 11686758 PRODUCTION PROFILE 06/15/07 1 Z-13A 11649962 MEMORY PROD PROFILE 04/21/07 1 W-17A 40012333 OH EDIT MWD/LWD 09/19/05 2 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E, Benson Blvd Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage. AK 99503-2838 ATTN: Beth Date Delivered: ;¡ H\j ? n ;wm Received by: C),',/ ¡ ~~" 1 06/18/07 . . 05-30 (PTD #1911150) Classified as Problem Well e e '5f.+-- v\'J. \ \D«> Subject: 05-30 (PTD #1(11150) Classified as Problem Well From: "NSLJ, ADW Well Integrity Engineer" <NSUADWWclllntcgrityEnginecr@BP.com> Date: Fri, 17 Feb 2006 20:52:58 -0900 To: "Dean, .James A" <.Jamcs.Dean(i¡;:BP.com>, "GPR FSlíSIP!STP Area Mgr" <GPBFSI TL(Cl}BP.com>, "Rossbcrg, R Steven" <Steven.Rossberg@BP.com>, "NSU, ADW Well Operations Supervisor" <NSUADWWeI10perationsSupcrvisor@BP.com>, "GPB, Wells Opt Eng" <GPBWellsOptEng@BP.com>, "AOGCC Jim Regg (E-mail)..<:iim_regg@admin.state.ak.us>. "AOGCC Winton Aubert (E-mail)..<winton_aubert@)admin.statc.ak.us>. "NSU, ADW WL & Completion Supervisor" <NSLJADWWL&CompletionSupervisor@BP.com>, "GPB, FS I OS Ops Lead" <GPßFS 1 DSOpsLcad@.BP.com> CC: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer(@BP.com>, "Austin, Paul A" <Pau1.A.Austin({l1BP.com> All, Well 05-30 (PTD #1911150) has been found to have sustained casing pressure on the IA. The TIO's on 02/17/06 were 2480/2160/460. A TIFL Failed on 02/17/06. The plan forward for this well is as follows: 1. DHD: TIFL - FAILED 2. WIE: Eval for GLV c/o 3. SL: c/o GL Vs 4. DHD: Re-TIFL ~p ~ ~ Zlb()f'S~ ùÞ-. 4bDf'>; Iv~P 6B7or" 5lJ ZOf'Si to J.Uc.{ f 3/, 4''i., q,Zr~ ¿;(,(- .per Œû4c17..-' ) SC-P ¿ 4-9~ ,~p A wellbore schematic has been included for reference. «05-30.pdt» The well has been classified as a Problem well. Please call if you have any questions. Thank you, }fnna (j)u6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 Content-Description: 05-30.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of 1 2/21/20069:24 AM TREE = ? WEl.LHEAD = CIW SAFETY NOTES: SLOTTED LNR 10974-11948 A CTUA TOR = AXELSON 05-30 KB. ELEV = 73' BF. ELEV- ? KOP= 4212' Max Angle = 93 @ 11249' . 2183' 4-112" CAIIIICO BAL-O SSSV NIp, ID- 3.812" 1 DatumMD= NA DatumTVD = 8800' SS -- .- I 2973' 4-112" X 3-1/2" XO 1 4-1/2" TBG, 12,6#, L-80, ,0152 bpf, ID = 3.958" 2973' Y ITOPOF3-1/2"TBG-IFC I~ 2973' ~ ~ GAS LIFT MANDRELS 3498' - ST MD TVD DBI 1YÆ VLV LATCH PORT DATE 113-3/8" CSG, 68#, L-80, ID = 12.415" I U 1 3141 3141 1 MC-FIVHO DMY RK 0 01110/03 Minimum ID =2.75" @10731' I 2 5249 5159 31 MC-FIVHO DMY RK 0 01/10/03 3-1/2" OTIS XN NIPPLE W/XO 3 6980 6508 40 MC-FIVHO DMY RK 0 4 7861 7178 40 MC-FIVHO DMY RK 0 5 8426 7604 42 MC-FIVHO DMY RK 0 3-112" 1BG-IPC, 9.3#, L-80, ,00870 bpf, ID - 2.992" 8761' 6 8675 7790 41 MC- FIVHO DMY RK 0 ~ CHEMICAL MANDRELS I ST I MD I TVD DBlI 1YÆ VLV LATCH PORT DATE 1 ......... ICNI 8840 I 7912 I 42 I MC-H/HO DMY RK 0 I i ~ 9144' 3-112" LOC SEAL ASSY 1 I TOPOF7" LNR 1 ::8:: ~ 9145' 9-518" X 3-1/2" BAKER D PKR I 9194' I 9298' 1-]3-112" OTIS X NIPW/XO, ID -2.813" 1 9-5/8" CSG, 47#, L-80, ID = 8.681" I 9531' ~ ~ I 10731' 1-]3-112" OTIS XN NIPW/XO, ID = 2.75" I ITOPOF 4-1/2" LNR 10733' J-- 3-1/2" TBG, 9.2#, 13CR-80, .00870 bpf, ID - 2.992" 10746' - 1074T 4-112" llWOVERSHOT SEALASSY I r TOP OF 4-1/2" LNR - SLOTlED 10974' [ I I I 17" LNR, 29#, L-80, .0371 bpf,lD =6.184" 11030' ~ I ~ I I ÆRFORA TON SUMIt1ARY I REF LOG: RIND DENSITY /NEUTRON ON 09/26/91 I I ANGLE AT TOP PERF: 88 @ 10974' I Note: Refer to Production DB for hstoricalperf data I SIZE SFF NTERV A L Opn/Sqz ()tI.lE I I 4-112" SLID 10974 - 11948 0 10/05191 I 1 I I I I I I 1 BOTTOM 4-1/2" LNR - SLOTlED H 11948' I 14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID=3.958" 12000' 1 m 11992' 1- 4-112" TlW GUIDE SHOE I I TO H 12000' I ()tI.lE RBI BY COMrÆNTS DATE REV BY COMM::NTS PRUDI-OE BAY UNIT 10105191 ORIGINAL COMPLETION WELL: 05-30 06117/01 RN/ìP CORRECTlONS PERMIT I'b: 1911150 01/10/03 IVH/Uh GLV UPDATE APII'b: 50-029-22213-00 06119/03 CrvkJ/1L P DATUM I\ID CORRECTION SEC 31, T11 N, R15E, 2046.47' FEL & 2252,61' FNL BP Exploration (Alas ka) e ON OR BEFORE 0 NoX/EMBER 2 200 E INDIVIDUAL WELL PERMIT DATA GEOLOGICAL INVENTORY REPORT DETAIL 09/14/1993 PAGE: 1 Are well Was well If yes, Are dry WELL IS 91-115 91-115 91-115 91-115 91-115 91-115 91-115 91-115 91-115 91-115 91-115 91-115 tests required? Yes cored? Yes~.. was the core analysis & RWD-DPR/GR RWD-MBD/GR RWD-MDP/MNP/DPR RWD-MDP/MNP/DPR RWD-MDP/MNP/GR RWD-MNFC/GR RWD-MNNC/GR SBT/GR/CCL 407 DAILY WELL OP SURVEY ditch samples required? ON COMPLIANCE. ~~ i kT AL 7630-11192,MD 7630-11192,MD 7630-11192,TVD 7630-11192,TVD 7630-11192,MD 7630-11192,MD 7630-11192,MD R1,5",3500-10346 COMP DATE:10/16/91 09/09/91-10/15/91 MWD DIRECTIONAL MWD-DP/MD/N description received? Yes ~ Yes No COMMENTS: / STATE OF ALASKA0 R I 6 IN ALASKA OIL AND GAS CONSERVATION COMMISSION ".; WELL COMPLETION OR RI:COMPLETION REPORT AND LOG . Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO A/aska, /nc. 91-115 3. Address B. APl Number 50 - 029-22213 9. Unit or Lease Name P. O. Box 196612, Anchorage, Alaska 99519-6612 ~,. Location of well at surface 1560' FNL, 36' FEL, S~-"tion 31, T11N, R15E, UM At Top Producing Inte~al 1059' FS~ 19m' ~L, s~ti°n 29, T11N, R15S OM 2246' FNL, 2040' FEL, S~t~n 29, T11N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 73' ¥~2. Date Spudded 9/9/91 6. Lease Designation and Serial No. ADL 28326 J13. Date T.D. Reached J14. Date Comp., Susp. or Aband. I15. 9/26/91 ! 10/5/91 * I 18. Plug Back Depth (,M.D+TVD)~19. Directional SUrvey p. Depth 12000' MD / 8782 TVD J YES r~ NO [] I Prudhoe Bay Unit 0. Well Number DS 5-30 1, Field and Pool Prudhoe Bay Field/Prudhoe Bay Pool Water' Depth, if offshore 116. No. of Completions N/A feet MSL I ONE 17. Total Depth (MD+TVD) 12000' MD / 8782' TVD 122. Type Electric or Other Logs Run where SSSV set 2183feet MD ~1i Thickness of Permafrost 900' MWD 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP mO'Fi'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Cond. H-40 Surface 110' 30" 11 Yards AS , 13-3/8" 68# L-80 Surface 3422' 16" 2880 cf CSIII & 460 cf Ci G Top Job w~ 192 cf CSII 9.5/$" 4-1/2" 47# 29# 12.6# L-80 L-80 L-80 Surface 9206' 10758' 9520' 11030' 11994' 12-1/4" 8-1/2" 8-1/2" 1012cf CIG& 506 sx CIG 497cu fl Class "G" None - Slotted Liner 24. Pedorations open to Production (MD+TVD of Top and Bottom and interval, size and number) None - Slotted Liner Completion 27. b'ate First Production 10/16/91 25. TUBING RECORD SIZE DEPTH SET (MD) 10757' PACKER SET (MD) .... 9145' 3-1/2" 9.3" L-80 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH !NTERVAL (MD) AMOLINT & KIND OF MATERIAL USED IDate o! Test Flow Tubing Press. Hours Tested Casing Pressure 28. I Method of Operation (Flowing, gas lift, etc.) F/owing tPR~ODLICTION FOR IOIL-BBL ~A,S-MC F WATER-BBL EST PERIOD ~ ALCULATED I~ JOIL-BBL GAS-MCF WATER-BBL HOUR RATE CORE DATA fHOKE SIZE IGAS-OIL IL GRAVITY-APl (C°rr) RATIO None KI::(.:EIVED *NOTE: Drilled & Tubing Ran 10/5/91 FEB 18 t992 Alaska 0il & Gas Cons. Commission Anchorage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate ~ GEOLOGIC MARKERS F(.., ..... ~TION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DfiPTH TRUE VERT. DEF~q GOR, and time of each phase. T~oP Saddlerochit " 9566' 8370' ase Saddlerochit 12000' 8782' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to lhe I~st of my knowledge Signed . Title Area Drilling Engineer Date ~'~ INSTRUCTIONS General': This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24 · If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of OperatiOn: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE AK PRUDHOE BAY UNIT DS 5-30 DOYON 9 SURF CIRC: 4.0 (1) TD: 0'( 0) SUPV: HOLE ANGLE: 0 0 MW: 0.0 VIS: 0 MOVE RIG. RIG ACCEPTED @ 02:00 HRS, 9/9/91. MIX SPUD MUD. DAILY:SO CUM:SO ETD:SO EFC:$0 SURF DRIL: 20.5 CIRC: 3.0 BOPE: 0.5 09/10/91 ( 2) DRLG. MW: 9.2 VIS:320 TD: 1700'(1700) MIX SPUD MUD. TEST DIVERTER. SPUD WELL @ 09:30 HRS, SUPV:JAWS 9/9/91. DRLG F/ 110'- 1700'. HOLE ANGLE:88 48 DAILY:S54,794 CUM:$54,794 ETD:S116,316 EFC:$3,383,478 SURF DRIL: 14.5 TRIP: 3.8 SURV: 1.8 CIRC: 4.0 09/11/91 ( 3) POOH FOR SURFACE CSG MW: 9.5 VIS:200 TD: 3505' (1805) DRLG F/ 1700'-3505'. CIRC. POOH. RIH. CIRC. POOH. SUPV:GLC HOLE ANGLE:88 48 DAILY:S57,872 CUM:$112,666 ETD:S174,188 EFC:$3,383,478 SURF TRIP: 1.5 CIRC: 2.5 CASG: 11.3 BOPE: 8.2 OTHR: 0.5 09/12/91 ( 4) RIH WITH BIT#2 13-3/8"@ 3497' MW: 9.6 VIS: 75 TD: 3505'( 0) POOH. R/U WOTCO. RIH W/ 13-3/8" CSG. FS @ 3498'. CIRC. SUPV:GLC PUMP 100 BBLS WATER, 513 BBLS (1500 SX) CSIII, 82 BBLS (400 HOLE ANGLE:88 48 SX) 'G' CMT. DISP W/ WATER. BUMP PLUG W/ 2000 PSI. N/D DIVERTER. TOP JOB W/ 34 BBLS (200 SX) CSII. N/U SPOOL, BOPE. TEST SAME. P/U BHA. DAILY:S333,729 CUM:$446,395 ETD:S507,917 EFC:$3,383,478 P1 DRIL: 16.0 TRIP: 0.8 CIRC: 2.5 EVAL: 0.5 CASG: 1.2 OTHR: 3.0 09/13/91 ( 5) DRLG. 13-3/8"@ 3497' MW: 9.6 VIS: 44 TD: 4750'(1245) RIH. TAG FC @ 3431'. TEST CSG. DRLG FC, CMT TO 3486'. SUPV:GLC CIRC. TEST CSG. CHANGE OUT MUD. DRLG FS, 10' NEW HOLE TO HOLE ANGLE:88 48 3515'. PERFORM LOT (14.6 PPG EMW). DRLG F/ 3515'-4750' DAILY:S81,674 CUM:$528,069 ETD:S589,591 EFC:$3,3~3,478 P1 DRIL: 17.5 TRIP: 5.5 CIRC: 1.0 09/14/91 ( 6) DRLG. 13-3/8"@ 3497' MW:10.4 VIS: 35 TD: 5955' ( 1205) DRLG F/ 4750'-5481'. SHORT TRIP TO SHOE. DRLG F/ SUPV:GLC 5481'-5955'. HOLE ANGLE:88 48 DAILY:S78,062 CUM:$606,131 ETD:S667,653 EFC:$3,383,478 P1 DRIL: 16.0 TRIP: 5.2 SURV: 0.5 CIRC: 0.3 OTHR: 1.8 PROB: 0.2 PROB CODE: TH 09/15/91 ( 7) DRLG. 13-3/8"@ 3497' MW:10.4 VIS: 37 TD: 6850' ( 895) DRLG F/ 5955'-6114' CIRC. POOH. RIH. REAM BTM 60'. SUPV:GLC DRLG F/ 6114'-6850'. HOLE ANGLE:88 48 DAILY:S134,958 CUM:$741,089 ETD:S802,611 EFC:$3,383,478 RECEIVED Alaska Oil & Gas Cons. Oommission Anchorage ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE AK PRUDHOE BAY UNIT DS 5-30 DOYON 9 P1 DRIL: 19.2 TRIP: 2.2 SURV: 0.5 CIRC: 1.3 OTHR: 0.8 09/16/91 ( 8) CHANGE TO BHA#4. 13-3/8"@ 3497' MW:10.4 VIS: 37 TD: 7705'( 855) DRLG F/ 6850'-7705'. CIRC. POOH. CHANGE BHA. SUPV:GLC HOLE ANGLE:88 48 DAILY:S49,759 CUM:$790,848 ETD:S852,370 EFC:$3,383,478 P1 DRIL: 14.2 TRIP: 3.5 RIGS: 2.8 CIRC: 0.3 EVAL: 0.5 BOPE: 0.2 OTHR: 1.0 PROB: 1.5 PROB CODE: EFC 09/17/91 ( 9) DRLG. 13-3/8"@ 3497' MW:10.5 VIS: 41 TD: 8620' ( 915) CHANGE BHA. RIH. CIRC. DRLG F/ 7705'-8620'. SUPV:GLC HOLE ANGLE:88 48 DAILY:S114,701 CUM:$905,549 ETD:S967,071 EFC:$3,383,478 P1 DRIL: 5.5 TRIP: 7.2 CIRC: 1.3 PROB: 10.0 PROB CODE: EFC 09/18/91 (10) REPAIR PUMP. 13-3/8"@ 3497' MW:10.5 VIS: 41 TD: 8950'( 330) DRLG F/ 8620'-8788'. WASH PIPE REPAIR. TRIP TO SHOE. DRLG SUPV:JAWS F/ 8788'-8950'. CBU. POOH. RIH TO 3675'. REPAIR PUMP. HOLE ANGLE:88 48 DAILY:S77,604 CUM:$983,153 ETD:S1,044,675 EFC:$3,383,478 P1 DRIL: 7.0 TRIP: 8.8 CIRC: 1.5 PROB: 6.7 PROB CODE: EFC 09/19/91 (11) POOH. 13-3/8"@ 3497' MW:10.5 VIS: 45 TD: 9182'( 232) REPAIR PUMP. RIH. DRLG F/ 8950'-9182'. CIRC. POOH. SUPV:JAWS HOLE ANGLE:88 48 DAILY:S67,128 CUM:$1,050,281 ETD:Si,iI1,803 EFC:$3,383,478 P1 DRIL: 8.2 TRIP: 7.3 CIRC: 6.0 CASG: 2.0 BOPE: 0.5 09/20/91 (12) RIH W/ 9-5/8" CSG. 9-5/8"@ 9519' MW:10.5 VIS: 39 TD: 9531' ( 349) RIH. DRLG F/ 9182'-9531'. CIRC. SHORT TRIP. CIRC. POOH. SUPV:JAWS TEST BOPE. RIH W/ 9-5/8" CSG. HOLE ANGLE:88 48 DAILY:S62,017 CUM:$1,112,298 ETD:S1,173,820 EFC:$3,383,478 P1 CIRC: 2.0 CASG: 13.5 BOPE: 7.0 OTHR: 1.5 09/21/91 (13) P/U BHA. 9-5/8"@ 9519' MW:10.5 VIS: 0 TD: 9531' ( 0) RIH W/ 9-5/8" CSG. FS @ 9520' CIRC. CMT CSG. DISP W/ SUPV:JAWS 690 BBLS MUD. DID NOT BUMP PLUG. N/D BOPE. INSTALL TBG HOLE ANGLE:88 48 SPOOL. N/U BOPE. TEST BOPE. P/U BHA. DAILY:S89,864 CUM:$1,202,162 ETD:S1,263,684 EFC:$3,383,478 PROD DRIL: 9.4 TRIP: 6.7 RIGS: 1.0 CIRC: 5.3 EVAL: 0.3 CASG: 1.3 09/22/91 (14) CIRC. 9-5/8"@ 9519' MW: 9.1 VIS: 45 TD: 9911' ( 380) RIH. TEST CSG @ 9439'. DRLG FC, CMT. TEST CSG. DRLG TO SUPV:JAWS 9542'. CIRC. RUN LOT (12.5 PPG EMW). DISP WELL W/ OBM. HOLE ANGLE:88 48 DRLG TO 9911'. CBU. DAILY:S121,041 CUM:$1,323,203 ETD:S1,384,725 EFC:$3,383,478 PROD DRIL: 10.0 TRIP: 12.8 CIRC: 1.2 09/23/91 (15) POOH. 9-5/8"@ 9519' MW: 9.1 VIS: 44 TD:10289' ( 378) POOH. RIH. DRLG F/ 9911'-10289'. CIRC. POOH. SUPV:JAWS HOLE ANGLE:88 48 DAILY:S83,291 CUM:$1,406,494 ETD:S1,468,016 EFC:$3,383,478 ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE AK PRUDHOE BAY UNIT DS 5-30 DOYON 9 PROD DRIL: 14.5 TRIP: 9.5 09/24/91 (16) DRLG. 9-5/8"@ 9519' MW: 9.1 VIS: 45 TD:lll30' ( 841) POOH. RIH. DRLG F/ 10289'-11130'. SUPV:JAWS HOLE ANGLE:88 48 DAILY:S104,781 CUM:$1,511,275 ETD:S1,572,797 EFC:$3,383,478 PROD DRIL: 10.5 TRIP: 7.8 RIGS: 1.0 CIRC: 1.2 EVAL: 2.5 OTHR: 1.0 09/25/91 (17) DRLG. 9-5/8"@ 9519' MW: 9.5 VIS: 47 TD:l1440' ( 310) DRLG F/ 11130'-11227'. CBU. POOH. CHANGE BHA. RIH. DRLG SUPV:JAWS F/ 11227'-11440'. HOLE ANGLE:88 48 DAILY:S78,361 CUM:$1,589,636 ETD:S1,651,158 EFC:$3,383,478 PROD DRIL: 18.5 TRIP: 1.5 CIRC: 0.8 EVAL: 3.2 09/26/91 (18) LOG W/ TELECO. 9-5/8"@ 9519' MW: 9.2 VIS: 47 TD:12000' ( 560) DRLG F/ 11440'-12000'. TD WELL @ 03:00 HRS, 9/26/91. CIRC. SUPV:JAWS POOH TO SHOE. RIH TO 10250'. LOG W/ TELECO F/ HOLE ANGLE:88 48 10250'-10550'. DAILY:S178,273 CUM:$1,767,909 ETD:S1,829,431 EFC:$3,383,478 PROD TRIP: 15.3 CIRC: 6.2 EVAL: 2.0 OTHR: 0.5 09/27/91 (19) POOH. 9-5/8"@ 9519' MW: 9.2 VIS: 47 TD:12000' ( 0) REPEAT LOG W/ TELECO. RIH TO 12000'. CIRC. POOH. L/D SUPV:POTTER BHA. RIH TO 11230'. CIRC. PUMP 5 BBLS MUD, 32 BBLS HOLE ANGLE:88 48 FORM-A-PLUG, 5 BBLS DIESEL. DISP W/ MUD. POOH TO SHOE. CBU. POOH. DAILY:S95,467 CUM:$1,863,376 ETD:S1,924,898 EFC:$3,383,478 RCSG: 24.0 09/28/91 ( 20) TD:12000 PB:12000 SUPV:POTTER RIH W/ 7" LNR. 9-5/8"@ 9519' MW: 9.30BM POOH. RIH W/ BHA. WASH F/ 10516'-11010' REAM TO 11030'. CIRC. POOH. TEST BOPE. RIH W/ 7" LNR. 0 DAILY: $123,728 CUM:$1,987,104 ETD: $2,048,626 EFC:$3,383,478 RCSG: 24.0 09/29/91 ( 21) TD:12000 PB:12000 SUPV:POTTER P/U DRLG ASS'Y. 7"@11030' MW: 9.30BM RIH W/ 7" LNR ON DP. CMT LNR. RELEASE F/ LNR. POOH. TEST BOPE. RIH. CIRC @ 9210'. NO CMT. POOH. TEST BOPE. P/U BHA. DAILY:S117,351 CUM:$2,104,455 ETD:S2,165,977 EFC:$3,383,478 COUT: 13.3 TCSG: 2.5 LPRF: 8.2 09/30/91 (22) RUN SBT. 7"@11030' MW: 9.30BM TD:12000 RIH TO 9850'. CIRC. DRLG TO 9988' CIRC. TEST LNR LAP. PB:12000 DRLG CMT F~ 9988'- 10275'. RIH TO ~C @ 10941'. TEST CSG. SUPV:MWW DRLG LC, CMT, FC TO 10986'. TEST CSG. POOH. R/U ATLAS. RIH W/ SBT TO 10350'. DAILY:S153,291 CUM:$2,257,746 ETD:S2,319,268 EFC:$3,383,478 ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE AK PRUDHOE BAY UNIT DS 5-30 DOYON 9 COUT: 20.8 LPRF: 3.3 10/01/91 (23) WASH TO TD. 7"@11030' MW: 9.20BM TD:12000 LOG W/ SBT. R/D ATLAS. RIH W. BIT TO FC @ 10986'. DRLG FC PB:12000 CMT, FS @ 11035. REAM FORM-A-PLUG F/ 11035'-11239'. RIH TO SUPV:MWW 12000'. CIRC. POOH. RIH W/ HOLE OPENER, CSG SCRAPERS. REAM OPEN HOLE. DAILY:S96,222. CUM:$2,353,968 ETD:S2,415,490 EFC:$3,383,478 COUT: 11.5 RCMP: 12.5 10/02/91 (24) SET PKR. 7"@11030' MW: 9.20BM TD:12000 WASH & REAM TO 12000'. CIRC. POOH. RIH W/ 4-1/2" LNR, PKR PB:12000 TO 11994'. CIRC. SET PKR. ATTEMPT TO TEST ANNULUS. RESET SUPV:MWW PKR. 4-1/2" LNR F/ 10758'-11994'. DAILY:S142,470 CUM:$2,496,438 ETD:S2,557,960 EFC:$3,383,478 RCMP: 8.5 OTHR: 15.5 10/03/91 (25) POOH. 7"@11030' MW: 9.0 NaCl TD:12000 PRESS ON PKR. RELEASE F/ HGR. POOH. RIH W/ OVERSHOT TO PB:12000 TOL @ 10758'. WASH OVER TIEBACK. TEST ANNULUS. REV CIRC. SUPV:JAWS CHANGE OVER TO 9.0 PPG BRINE. POOH. DAILY:S42,153 CUM:$2,538,591 ETD:S2,600,113 EFC:$3,383,478 COUT: 2.2 RPKR: 16.3 RCMP: 4.8 OTHR: 0.8 10/04/91 (26) RIH W/ TBG. 7"@11030' MW: 9.0 NaCl TD:12000 POOH. RIH W/ PKR. SET PKR. POOH, L~D DP. RIH W/ TBG. PB:12000 SUPV:JAWS DAILY:S50,665 CUM:$2,589,256 ETD:S2,650,778 EFC:$3,383,478 NDNU: 7.5 RCMP: 13.5 OTHR: 3.0 10/05/91 (27) MOVE RIG. 7"@11030' MW: 9.0 NaCl TD:12000 RIH W/ TBG. DISP W/ 120 BBLS DIESEL. TEST TBG, ANNULUS. PB:12000 N/D BOPE. N/U TREE. TEST TREE. RIG RELEASED @ 03:00 HRS, SUPV:JAWS 10/5/91. MOVE RIG. DAILY:S208,536 CUM:$2,797,792 ETD:S2,859,314 EFC:$3,383,478 DRILL SITE 5 SEC 3~ 32 DRILL SITE TI1N. VICINITY MAP NOTES N.T.S. I I SEC. 31' E. 32 · LEGEND · EXISTING WELLS · , CONDUCTOR AS-BUILT THIS I. BASIS O~ LOCA~O~ PER D~ILL SITE .5 MONUId[NTS SA AND 58. 2. COC)~DINATES S~OWN ALASKA ~7A~ ~AN[ Z~[ 4. · ~CO D~ (~LL.W.) 4. RErEREN~ rl~ B~: PB g0-~ (P. 28- 36) DA~ ~ ~R~Y ~/2~/90 LOCAT[~ ilt!.THIN Plt0TI~ACT'E:D SIC. 31 I: 32. T11N. It15[. LIWIAT M£RI::)[AN. ALASKA. WELLi A.S.P. I I~ANT GEOC~TIC !CELLAR NO. C~RDS. C~. P~lq~ BOx L~A~ E~v. IN ~C~ 23 ~.g4g,521.45 N 2639.62 1~4'24.271' 34.3 1619' ~L ~C. 697,021.~ E 215.22 70q6'01.529' 25' , ~O 5,949,~.22 N 2700.10 ~48~4'24.642' ~.6 1560' ~L ~C. ~97,~7.~ E 215.~ 70~6'02.111' ~, ,,, ~1 5.9497~.82 N 2519.74 ~48~4'2~.5~' 550 17~T ~L ~C. 697,~9.57 E 214.94 70~'~.575' 5279' ~,, 28 5,~9,0~.65 N 1620.14 1~'25'52.68~ 24~1' ~L ~C. ~5.2 69&,127.~1 E ~07.97 70q5'55.~ 4220' ~L 52 , , SURVEYOR'S CERTII:ICA TE I HEREBY CERTIFY THAT ] AM PRO- PERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE: OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMEN- SIONS AND OTHER DETAILS ARE CORRECT AS 0¢ NOV. 29. 1990. RECEIVED DEC 2 o 1990 A_las~.Ojl & Gas Cons. Co' .... '.'-.,i N~choraga F. ROBERT BELL &: ASSOC ARCO Alaska Inc. DRILL SITE 5 CONDUCTOR AS-BUILT WELLS # 25, 28, 30, 51 Teleco Oilfield Sei']"~s~ Inc. [ TELEEO]6116 Nielson way Anchorage, AK 99518 (907) 562-2646 ¢i.__//~'- ORIGINAt TELECO MWD SURVEYS WELL #D5-30 TELECO JOB # 847TAK Teleco appreciates the opportunity to provide our services. Please find attached a copy of the directional surveys in each of the following formats: · Measured Depth No Interpolation · Measured Depth 100' Interpolated · True Vertical Depth 100' Interpolated RECEIVED FEB 1 ii 1992, Alaska Oil & Gas Cons. Commission Anchorage A S~iAT COMPANY MEASURED DEPTH NO INTERPOLATION TELECO OILFIELD SERVICES INC ALASKA PRUDHOE BAY DRILLING Well Name Location Date Surveyed Job No. Survey Performed By : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope : SEP 26, 1991 : 847TAK : JOHN BURTON This survey is correct to the best of my knowledge and is supported by actual field data. · .... TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING Well Name : DS5-30 Location : Drill site # 5 : Prudhoe Bay : North Slope No Interpolation Date SEP 26, 1991 Filename : 847TAK Plane of Vertical Section : 37.8° Latitude & Departure relate to : SLOT CENTER Vertical Section Originates at : SLOT CENTER Slot Coordinates : Lat 0.000ft : Dep 0.000ft Directions Referenced To : TRUE NORTH Depth at Drill Floor : 0.00 ft Calculation Method : MINIMUM CURVATURE Magnetic Declination :+30°48.000'E Platform north : +0° 0' 0'' (T) Grid convergence : +0.0000° TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING Well Name : DS5-30 Location : Drill site # 5 : Prudhoe Bay : North Slope No Interpolation MD C~L INC DIR ft ft deg deg 3455 0 1.0 175.0 3767 312 2.3 3.0 4021 254 6.4 21.3 4212 191 12.5 23.1 4402 190 14.2 25.5 TVD ft 3454.7 3766.6 4019.9 4208.2 4393.0 VS ft -1.4 1.7 19.5 49.7 92.4 Page 1 of 2 Date SEP 26, 1991 Filename : 847TAK LAT DEP D' LEG ft ft ° / 100 -23.0 27.3 0.0 -19.4 27.9 1.1 -1.2 33.3 1.7 27.8 45.3 3.2 67.7 63.4 0.9 4593 191 21.1 32.9 4784 191 24.7 32.2 4975 191 28.4 35.7 5166 191 31.0 37.1 5358 192 33.2 35.7 4575.0 4750.9 4921.7 5087.6 5250.3 149.6 223.6 308.7 403.3 505.3 117.8 92.2 3.8 180.5 132.1 1.9 251.2 179.9 2.1 327.3 236.1 1.4 409.4 296.6 1.2 5579 221 39.9 33.3 5895 316 38.8 33.6 6214 319 39.6 36.1 6532 318 39.8 33.6 6850 318 40.0 34.0 5427.7 5672.1 5919.3 6164.0 6407.9 636.6 836.4 1037.7 1240.5 1444.0 517.9 370.9 3.1 685.1 481.4 0.4 850.5 596.6 0.6 1017.2 712.6 0.5 1186.7 826.1 0.1 7168 318 40.4 38.5 7485 317 40.5 38.9 7797 312 40.4 42.1 8116 319 41.1 42.4 8437 321 41.7 42.1 6650.9 6892.1 7129.5 7371.2 7612.0 1649 1854 2056 2264 2476 .1 .7 .9 .5 .1 1352.1 947.4 0.9 1512.6 1076.0 0.1 1666.5 1207.4 0.7 1820.6 1347.4 0.2 1977.8 1490.2 0.2 8745 308 41.4 42.1 8995 250 43.9 38.9 9184 189 54.7 36.4 9439 255 54.1 38.5 9626 187 57.0 36.4 7842.5 2679.8 2129.3 1627.1 0.1 8026.4 2848.9 2258.2 1737.0 1.3 8149.5 2992.0 2371.6 1824.2 5.8 8297.9 3199.3 2536.2 1950.2 0.7 8403.7 3353.5 2658.6 2044.0 1.8 9724 98 59.9 34.7 9819 95 62.8 33.3 9919 100 65.1 33.3 10011 92 65.7 37.8 10106 95 68.0 37.8 8455.0 8500.5 8544.4 8582.7 8620.1 3436 3520 3609 3693 3780 .9 .1 .6 .2 .5 2726.6 2092.5 3.3 2795.7 2139.1 3.3 2870.8 2188.4 2.3 2938.8 2237.0 4.5 3007.8 2290.6 2.4 10201 95 70.5 37.8 10296 95 72.8 37.5 10390 94 74.8 36.8 10485 95 77.1 35.7 10580 95 79.2 34.7 8653.7 8683.6 8709.9 8732.9 8752.4 3869.4 3959.5 4049.8 4141.9 4234.8 3078.0 2345.0 2.6 3149.4 2400.1 2.4 3221.3 2454.6 2.2 3295.6 2509.1 2.7 3371.6 2562.7 2.4 10676 96 81.3 34.3 10772 96 83.4 33.3 10867 95 85.7 32.2 10963 96 87.5 31.5 11058 95 89.7 30.4 8768.7 8781.5 8790.5 8796.2 8798.5 4329.2 4424.2 4518.3 4613.7 4708.0 3449.6 2616.3 2.2 3528.6 2669.2 2.4 3608.2 2720.3 2.7 3689.6 2770.9 2.0 3771.0 2819.7 2.6 TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING Well Name : DS5-30 Location : Drill site # 5 : Prudhoe Bay : North Slope No Interpolation Page 2 of 2 Date SEP 26, 1991 Filename : 847TAK MD C\L INC DIR TVD ft ft deg deg ft 11154 96 91.8 29.7 8797.2 11249 95 93.3 30.1 8793.0 11343 94 92.7 29.7 8788.1 11438 95 92.4 28.7 8783.9 11533 95 91.1 28.0 8781.0 VS LAT DEP D'LEG ft ft ft °/100 4803.1 3854.1 2867.8 2.3 4897.1 3936.4 2915.1 1.6 4990.1 4017.7 2961.9 0.8 5083.9 4100.6 3008.2 1.1 5177.6 4184.2 3053.3 1.6 11628 95 90.5 28.6 8779.6 11723 95 90.2 29.0 8779.1 11819 96 89.5 28.3 8779.3 11917 98 88.8 28.7 8780.8 5271.3 5365.1 5459.9 5556.6 4267.8 3098.3 0.9 4351.0 3144.1 0.5 4435.3 3190.2 1.0 4521.4 3236.9 0.8 Origin of Bottom Hole Closure SLOT Bottom Hole Closure 5561 ft 35.6° MEASURED DEPTH 100' INTERPOLATED TELECO OILFIELD SERVICES INC ALASKA PRUDHOE BAY DRILLING Well Name Location Date Surveyed Job No. Survey Performed By : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope : SEP 26, 1991 : 847TAK : JOHN BURTON This survey is correct to the best of my knowledge and is supported by actual field data., TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING Well Name : DS5-30 Location : Drill site # 5 : Prudhoe Bay : North Slope Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of MD Plane of Vertical Section : 37.8° Latitude & Departure relate to : SLOT CENTER Vertical Section Originates at : SLOT CENTER Slot Coordinates : Lat 0.000ft : Dep 0.000ft Directions Referenced To : TRUE NORTH Depth at Drill Floor : 0.00 ft Calculation Method : MINIMUM CURVATURE Magnetic Declination :+30°48.000'E Platform north : +0° 0' 0'' (T) Grid convergence : +0.0000° Client Well Name Location TELECO OILFIELD SERVICES INC : PRUDHOE BAY DRILLING : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope Page 1 of 3 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of MD MD C~L INC DIR TVD ft ft deg deg ft 3455 0 1.0 175.0 3454.7 3500 45 1.2 150.2 3499.7 3600 100 1.6 95.1 3599.7 3700 100 2.0 39.9 3699.7 3800 100 2.8 5.4 3799.5 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 100 4.4 12.6 100 6.1 19.8 100 8.9 22.0 100 12.1 23.0 100 13.3 24.2 100 14.2 25.5 100 17.7 29.3 100 21.2 32.9 100 23.1 32.5 100 25.0 32.5 3899.2 3998.9 4097.8 4196.4 4293.8 4391.1 4486.4 4581.4 4673.5 4765.2 4900 100 26.9 34.3 4854.6 5000 100 28.7 35.9 4943.4 5100 100 30.1 36.6 5030.3 5200 100 31.4 36.9 5116.4 5300 100 32.5 36.1 5201.1 5400 100 34.5 35.2 5284.0 5500 100 37.5 34.2 5364.3 5600 100 39.8 33.3 5443.9 5700 100 39.5 33.4 5521.3 5800 100 39.1 33.5 5598.6 5900 100 38.8 33.6 5675.9 6000 100 39.1 34.4 5753.4 6100 100 39.3 35.2 5830.9 6200 100 39.6 36.0 5908.4 6300 100 39.7 35.4 5985.5 6400 100 39.7 34.6 6062.4 6500 100 39.8 33.9 6139.3 6600 100 39.8 33.7 6216.1 6700 100 39.9 33.8 6292.9 6800 100 40.0 33.9 6369.6 6900 100 40.1 34.7 6446.1 7000 100 40.2 36.1 6522.5 7100 100 40.3 37.5 6598.9 7200 100 40.4 38.5 6675.2 7300 100 40.4 38.7 6751.3 VS ft -1.4 -1.0 0.0 1.0 4.0 11.0 18.0 32.0 47.8 69.5 91.9 121.7 152.3 191.0 230.7 275.3 321.1 370.6 421.4 474.5 530.3 589.7 649.9 713.1 776.3 839.5 902.6 965.8 1028.9 1092.6 1156.3 1220.1 1284.0 1348.0 1412.0 1476.3 1540.7 1605.2 1669.8 1734.7 LAT DEP D'LEG ft ft °/100 -23.0 27.3 0.0 -22.5 27.4 0.0 -21.3 27.6 1.3 -20.2 27.8 1.7 -17.1 28.6 1.6 -9.9 30.7 1.7 -2.7 32.8 1.7 10.8 38.2 2.9 26.0 44.5 3.2 46.3 53.7 1.2 67.3 63.2 0.9 93.4 78.2 3.7 120.1 93.6 3.7 152.9 114.6 1.9 186.4 136.1 1.9 223.4 161.2 2.1 261.1 187.3 1.9 301.0 216.7 1.4 341.8 246.8 1.3 384.6 278.3 1.2 430.1 310.7 2.0 479.1 344.4 3.1 529.0 378.3 2.4 581.9 413.2 0.4 634.9 448.2 0.4 687.7 483.2 0.3 739.6 519.3 0.6 791.4 555.4 0.6 843.3 591.5 0.6 895.6 628.0 0.4 948.0 664.5 0.5 1000.4 700.9 0.5 1053.4 736.9 0.1 1106.7 772.6 0.1 1160.0 808.3 0.1 1212.7 845.2 0.5 1264.7 883.3 0.9 1316.7 921.5 0.9 1368.3 960.4 0.7 1418.9 1001.0 0.1 Client Well Name Location TELECO OILFIELD SERVICES INC : PRUDHOE BAY DRILLING : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope Page 2 of 3 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of MD MD C~L INC DIR TVD ft ft deg deg ft 7400 100 40.5 38.8 6827.4 7500 100 40.5 39.1 6903.5 7600 100 40.5 40.1 6979.6 7700 100 40.4 41.1 7055.7 7800 100 40.4 42.1 7131.8 7900 8000 8100 8200 8300 8400 8500 8600 8700 8800 8900 9000 9100 9200 9300 9400 9500 9600 9700 9800 9900 10000 10100 10200 10300 10400 10500 10600 10700 10800 10900 11000 11100 11200 11300 100 40.6 42.2 100 40.8 42.3 100 41.1 42.4 100 41.3 42.3 100 41.4 42.2 100 41.6 42.1 100 41.6 42.1 100 41.5 42.1 100 41.4 42.1 100 41.9 41.4 100 42.9 40.1 100 44.2 38.8 100 49.9 37.5 100 54.7 36.5 100 54.4 37.4 100 54.2 38.2 100 55.0 37.8 100 56.6 36.7 100 59.2 35.1 100 62.2 33.6 100 64.7 33.3 100 65.6 37.3 100 67.9 37.8 100 70.5 37.8 100 72.9 37.5 100 75.0 36.7 100 77.4 35.5 100 79.6 34.6 100 81.8 34.0 100 84.1 33.0 100 86.3 32.0 100 88.4 31.1 100 90.6 30.1 100 92.5 29.9 100 93.0 29.9 7207.6 7283.3 7359.1 7434.2 7509.2 7584.2 7659.1 7734.0 7808.8 7882.9 7956.5 8029.6 8094.8 8158.8 8217.0 8275.2 8332..4 8389.0 8442.4 8491.4 8536.1 8578.1 8617.7 8653.4 8684.8 8712.3 8736.0 8755.8 8771.9 8784.1 8792.4 8797.1 8798.0 8795.2 8790.4 VS LAT DEP D'LEG ft ft ft °/100 1799.6 1469.6 1041.5 0.1 1864.4 1520.0 1082.3 0.2 1929.2 1569.3 1124.5 0.7 1994.0 1618.7 1166.6 0.7 2058.8 1667.9 1208.8 0.6 2123.9 2189.0 2254.0 2319.8 2385.8 2451.7 2517.8 2583.9 2650.0 2717.0 2784.7 2852.7 2928.4 3005.0 3086.3 3167.6 3249.6 3332.0 3416.5 3503.4 3592.6 3683.2 3775.0 3868.4 3963.4 4059.5 4156.6 4254.5 4353.0 4451.9 4551.1 4650.4 4749.6 4848.6 4947.5 1716.3 1252.6 0.2 1764.6 1296.5 0.2 1812.9 1340.4 0.2 1861.7 1384.8 0.2 1910.7 1429.3 0.2 1959.7 1473.7 0.2 2008.8 1518.2 0.0 2058.0 1562.7 0.1 2107.2 1607.1 0.1 2157.7 1651.3 0.7 2209.2 1695.3 1.3 2261.2 1739.3 1.5 2321.2 1785.4 5.8 2381.9 1832.1 4.8 2446.5 1881.5 0.7 2511.0 1931.0 0.7 2576.1 1980.8 0.9 2641.6 2030.9 1.8 2709.9 2080.6 2.9 2781.8 2129.8 3.3 2856.5 2179.0 2.5 2930.6 2231.2 3.7 3003.4 2287.2 2.3 3077.3 2344.4 2.6 3152.4 2402.4 2.4 3229.1 2460.3 2.3 3307.6 2517.5 2.6 3387.9 2573.8 2.4 3469.3 2629.5 2.3 3552.1 2684.3 2.5 3636.2 2737.7 2.5 3721.3 2789.9 2.2 3807.4 2840.8 2.5 3893.9 2890.7 1.9 3980.5 2940.5 0.4 Client Well Name Location TELECO OILFIELD SERVICES : PRUDHOE BAY DRILLING : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope INC Page 3 of 3 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of MD MD C~L INC DIR TVD ft ft deg deg ft 11400 100 92.5 29.1 8785.6 11500 100 91.6 28.2 8782.0 11600 100 90.7 28.4 8780.0 11700 100 90.3 28.9 8779.2 11800 100 89.6 28.4 8779.3 11917 117 88.8 28.7 8780.8 VS LAT DEP D'LEG ft ft ft °/100 5046.4 4067.5 2989.7 0.9 5145.0 4155.1 3037.6 1.3 5243.6 4243.1 3085.1 0.9 5342.4 4330.9 3133.0 0.6 5441.1 4418.6 3181.1 0.8 5556.6 4521.4 3236.9 1.5 Origin of Bottom Hole Closure SLOT Bottom Hole Closure 5561 ft 35.6° TRUE VERTICAL DEPTH 100' INTERPOLATED TELECO OILFIELD SERVICES INC ALASKA PRUDHOE BAY DRILLING Well Name Location Date Surveyed Job No. Survey Performed By : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope : SEP 26, 1991 : 847TAK : JOHN BURTON This survey is correct to the best of my knowledge and is supported by actual field data. ..... ~ COMPANY REPRESENTATIVE TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING Well Name : DS5-30 Location : Drill site # 5 : Prudhoe Bay : North Slope Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of TVD Plane of Vertical Section : 37.8° Latitude & Departure relate to : SLOT CENTER Vertical Section Originates at : SLOT CENTER Slot Coordinates : Lat 0.000ft : Dep 0.000ft Directions Referenced To : TRUE NORTH Depth at Drill Floor : 0.00 ft Calculation Method : MINIMUM CURVATURE Magnetic Declination :+30°48.000'E Platform north : +0° 0' 0'' (T) Grid convergence : +0.0000° Client Well Name Location TELECO OILFIELD SERVICES INC : PRUDHOE BAY DRILLING : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope Page 1 of 2 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of TVD MD C~L INC DIR TVD ft ft deg deg ft 3455 0 1.0 174.8 3455.0 3500 45 1.2 150.0 3500.0 3600 100 1.6 94.9 3600.0 3700 100 2.0 39.7 3700.0 3800 100 2.8 5.4 3800.0 3901 4001 4102 4204 4306 4409 4514 4620 4729 4839 4951 5065 5181 5299 5420 5544 5672 5802 5931 6060 6189 6319 6449 6579 6709 6840 6971 7101 7233 7364 7495 7627 7758 7890 8022 100 4.5 12.6 100 6.1 19.9 101 9.0 22.1 101 12.2 23.0 103 13.3 24.3 103 14.5 25.8 105 18.3 29.9 106 21.6 32.8 109 23.7 32.4 110 25.8 33.2 112 27.9 35.3 114 29.6 36.4 115 31.2 37.0 118 32.5 36.1 121 35.1 35.0 125 38.9 33.7 128 39.6 33.4 129 39.1 33.5 129 38.9 33.9 129 39.2 34.9 129 39.5 35.9 130 39.7 35.3 130 39.7 34.3 130 39.8 33.7 130 39.9 33.8 130 40.0 34.0 131 40.2 35.7 131 40.3 37.6 131 40.4 38.6 131 40.5 38.7 131 40.5 39.0 131 40.5 40.4 131 40.4 41.7 132 40.6 42.2 132 40.9 42.3 3900.0 4000.0 4100.0 4200.0 4300.0 4400.0 4500.0 4600.0 4700.0 4800.0 4900.0 5000.0 5100.0 5200.0 5300.0 5400.0 5500.0 5600.0 5700.0 5800.0 5900.0 6000.0 6100.0 6200.0 6300.0 6400.0 6500.0 6600.0 6700.0 6800.0 6900.0 7000.0 7100.0 7200.0 7300.0 VS ft -1.4 -1.0 0.0 1.0 4.0 11.1 18.1 32.3 48.4 70.9 94.6 126.0 160.1 202.2 248.1 297.9 353.4 411.1 473.8 542.1 616.1 695.7 777.5 859.1 940.6 1022.0 1104.6 1187.5 1270.6 1354.0 1437.4 1521.7 1606.1 1691.0 1776.2 1861.5 1946.6 2031.7 2117.4 2203.3 LAT DEP D'LEG ft ft °/100 -23.0 27.3 0.0 -22.5 27.4 0.0 -21.3 27.6 1.3 -20.2 27.8 1.7 -17.0 28.6 1.6 -9.8 30.7 1.7 -2.6 32.9 1.7 11.2 38.4 2.9 26.5 44.8 3.2 47.6 54.3 1.1 69.7 64.5 1.1 97.2 80.3 3.8 126.7 97.9 3.3 162.4 120.6 1.9 200.8 145.9 1.9 242.2 173.8 2.1 287.1 206.4 1.6 333.5 240.7 1.4 384.0 277.9 1.2 439.8 317.4 2.2 501.0 359.3 3.1 567.4 403.6 0.6 635.8 448.8 0.4 703.8 494.4 0.3 770.7 541.0 0.6 837.6 587.6 0.6 905.5 634.9 0.3 973.6 682.3 0.5 1042.2 729.4 0.3 1111.7 775.9 0.1 1181.2 822.4 0.1 1249.4 872.1 0.9 1317.5 922.0 0.9 1384.8 973.6 0.5 1451.3 1026.9 0.1 1517.7 1080.4 0.1 1582.5 1135.7 0.7 1647.3 1191.1 0.7 1711.4 1248.3 0.3 1775.2 1306.2 0.2 Client Well Name Location TELECO OILFIELD SERVICES INC : PRUDHOE BAY DRILLING : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope Page 2 of 2 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of TVD MD C~L INC DIR TVD ft ft deg deg ft 8154 132 41.2 42.4 7400.0 8288 133 41.4 42.2 7500.0 8421 133 41.7 42.1 7600.0 8555 134 41.6 42.1 7700.0 8688 134 41.5 42.1 7800.0 8823 135 42.2 41.1 7900.0 8959 136 43.5 39.4 8000.0 9108 149 50.4 37.4 8100.0 9271 163 54.5 37.1 8200.0 9443 172 54.2 38.5 8300.0 9619 177 56.9 36.5 8400.0 9818 198 62.8 33.3 8500.0 10055 237 66.8 37.8 8600.0 10355 300 74.0 37.1 8700.0 11917 %1562 88.8 28.7 8780 .8 VS ft 2289.8 2377.7 2465.5 2553.9 2642.2 2732.7 2824.7 2934.5 3062.6 3202.4 3348.1 3519.2 3733.6 4015.9 5556 LAT DEP D'LEG ft ft °/100 1839.4 1364.5 0.2 1904.7 1423.8 0.2 1969.9 1483.1 0.2 2035.6 1542.5 0.1 2101.4 1601.9 0.1 2169.6 1661.5 0.7 2239.7 1721.2 1.3 2326.0 1789.2 4.7 2427.6 1867.1 2.5 2538.6 1952.1 0.7 .6 2654.3 2040.7 2794.9 2138.6 2970.7 2261.8 3194.3 2434.1 4521.4 3236 1.8 3.3 2.4 2.4 .9 7.9 Origin of Bottom Hole Closure SLOT Bottom Hole Closure 5561 ft 35.6° [ TELECD1 Teleco Oilfield Se~~ S Inc. 6116 Nielson way Anchorage, AK 99518 (907) 562-2646 November 26, 1991 JOB #847 TAK PRUDHOE BAY DRILLING GROUP PRUDHOE BAY. FLF2LD Naska 0it & ~'~s Cons, CommiSSJ[~l Attached please find a copy of the final well report for the above mentioned well. Teleco appreciates this opportunity to provide MWD service to the Prudhoe Bay Drilling Group. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning this report or any of our other services. Sincerely, i~- Thomas A. Brockway /~_ Petroleum Engineering~ Supervisor TAB/el Enclosures A $~NAI" COMPANY FINAL WELL REPORT FOR ARCO ALASKA INC. PRUDHOE BAY DRILLING INC. PRUDHOE BAY FIELD DRILL SITE 5, WELL NO. 30 TELECO OILFIELD SERVICES, JOB# 847 TAK Submitted By: John Burton Tommy Foster John Connor Tom Shyr Field Service Engineers September 28, 1991 DISCLAIMER Teleco does not guarantee the accurateness or correctness of interpretations provided in or from this report. Since all interpretations are opinions based on measurements, Teleco shall under no circumstances be responsible for consequential damages or any other loss, costs, damages or expenses incurred or sustained in connection with the use of any such interpretations. Teleco disclaims all expressed and implied warranties related to it's service which is governed by Teleco's standard terms and conditions. TABLE OF CONTENTS I. GENERAL WELL INFORMATION II. WELL SUMMARY III. DRILLING AND ENGINEERING a) Run Summary b) Bottom-hole Assemblies c) Mud Record IV. FORMATION EVALUATION V. DIRECTIONAL SURVEY DATA VI. TELECO SERVICES I. GENERAL WELL INFORMATION GENERAL WELL INFORMATION OIL COMPANY: OIL COMPANY REPRESENTATIVES: WELL LOCATION: WELL TYPE: SPUD DATE: DRILLING CONTRACTOR: RIG NAME AND TYPE: RIG EQUIPMENT: TELECO SERVICES: TELECO JOB NUMBER: TELECO PERSONNEL: PRUDHOE BAY DRILLING INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 GENE COOPER - EVERETT POTTER JOHN WILLOUGHBY SURFACE LOCATION: 1560 FT. FNL, 36 FT. FEL OF SECTION 31, TllN, R15E UM PRUDHOE BAY DRILL SITE 5 WELL #30 NORTH SLOPE, ALASKA INVERTED HORIZONTAL AUG 09, 1991 DOYON DRILLING JV NUMBER 9, LAND DIESEL ELECTRIC, ROTARY DUAL PROPAGATION RESISTIVITY NEUTRON POROSITY DENSITY POROSITY NATURAL GAMMA RAY DIRECTIONAL WEIGHT ON BIT HOOK LOAD RATE OF PENETRATION DOWNHOLE TEMPERATURE DOWNHOLE MEMORY 847 TAK PAUL SMITH - DON LENTZ TOMMY FOSTER - RON GEHRES JOHN BURTON JOHN CONNER TOM SHYR II. WELL SUMMARY WELL SUMMARY Teleco's measurement while drilling service was utilized on Prudhoe Bay Drilling Inc.'s well #DS5-30 located in the Prudhoe Bay field on the North Slope of Alaska. Teleco was used to provide directional data, surveys, and logs throughout the course of the well. The gamma ray and dual propagation resistivity log (DPR) was used through correlation to identify lithologies, pick formation boundaries, and to select a 9 5/8 inch casing point. Gamma ray, resistivity, neutron and density (Triple Combo) service was used as log of record to identify lithologies, formation boundaries, gas-oil contacts and well TD. Directional service began at 3505 feet on September 12, 1991. Logging service commenced at 7705 feet measured depth and was used to a total measured depth of 12,000 feet. The 7 3/4 inch directional tool was used to drill 4200 feet with 73.5 circulating hours. The 7 3/4 inch DPR tool was used to log 1826 feet with 41.5 circulating hours. Triple Combo services with 6 3/4 inch tools were used to log 2569 feet with 72.0 circulating hours. Service ended on September 27, 1991. III. DRILLING AND ENGINEERING DRILLING AND ENGINEERING RUN NO 1 & 2:3505 TO 7705 FEET MD, 12 1/4 INCH HOLE TOOL NUMBER AND TYPE: 257-63, 4X DTF-1 Surface casing was set at 3497 feet. Teleco was then utilized for directional service to drill out of casing and for kick-off #1 at the start of the 12 1/4 inch section of the hole. Surveys were taken every stand in order to ensure well path control. Directional service was completed with a total 73.5 circulating hours. Directional control was established and maintained with the use of a 1 degree bent housing steerable mud motor by sliding and rotating with this assembly. The maximum dogleg for run no. 1 was 3.79 degrees per 100 feet. For run no. 2, the maximum dogleg was 0.92 degrees per 100 feet. Run no. 2 ended with an angle of 40.0 degrees. The directional tool was laid down at this point for a service upgrade. RUN NOS. 3 THRU 5: 7705 TO 9531 FEET MD, 12 1/4 INCH HOLE TOOL NUMBER AND TYPE: 1757-53, 4X DTF-3 Teleco continued to provide directional service and began DPR logging services through this section of hole for correlation and to pick 9 5/8 inch casing point. A 1 degree bent housing steerable mud motor was used with Teleco for directional control during these runs with directional surveys recorded, approximately every 95 feet. Runs 3 and 4 were made using this assembly in order to maintain directional control through the hole section between kick off point no. 1 and no. 2 with maximum doglegs of 0.67 & 1.32 degrees per 100 feet, respectively. Run no. 4 had a final angle of 51.4 degrees. Run number 5 was made from 9182 to 9531 feet MD. The same steerable motor was made up with Teleco to build angle and steer the well path into the second kick-off. The wellbore was built from 51.4 to 54.1 degrees before casing point was chosen and DPR service was terminated. Maximum dogleg for this run was 5.8 degrees per 100 feet. These five runs were made without a Teleco failure. Teleco was laid down after 41.5 circulating hours of DPR service and a total of 115.0 hours (including directional service) for a service upgrade and to run 9 5/8 inch casing. RUN NO 6: 9531 TO 9911 FEET MD, 8 1/2 INCH HOLE TOOL NUMBER AND TYPE: 1677-02, 4X MOD TF-1 Teleco's Triple-Combo service was employed for this section of the hole for correlation purposes in addition to formation evaluation. This service provided density, neutron porosity, dual propagation resistivity, natural formation gamma ray, and bottom hole circulating temperature measurements in addition to directional information. For this run a packed rotary assembly was used, but had to be pulled due to a left-hand walk at 9911 feet with 62.8 degrees of inclination. During this run Teleco experienced two failures of modular tools, the first failure was a density sub which began operating intermittently. This resulted in several data gaps in the memory log. The second was a memory sub failure which lost one quarter of its internal memory. Teleco's memory subs incorporate two redundant memories to safeguard against memory loss, which was successful in the protection of this run's formation data. RUN NO 7: 9911 TO 10289 FEET MD, 8 1/2 INCH HOLE TOOL NUMBER AND TYPE: 1677-02, 4X MOD TF-1 Teleco's triple combo service was used again for run number 7 to provide formation evaluation and for correlation purposes. A 1 degree bent housing motor was utilized for directional control. At the start of this run a checkshot survey was taken and the results agreed with the Teleco surveys. During the run directional surveys were run frequently to check the well path. RUN NO 8:10289 TO 11228 FEET MD, 8 1/2 INCH HOLE TOOL NUMBER AND TYPE: 1677-02, 4X MOD TF-1 Teleco's Triple-Combo tool string was made up with a rotary build assembly for this run which achieved an average build rate of 2.26 degrees per 100 feet and had a maximum dogleg of 2.67 degrees per 100 feet. The inclination was increased from 70.5 to 91.8 degrees in 15 circulating hours. Teleco did not have any failures this run and formation evaluation and lithological correlation was successful. This hole segment also contained a section of relog which was performed after Run 9, from 10280 to 10610 feet md. This run was terminated to pick up a packed rotary assembly to complete the inverted horizontal portion of the wellbore. RUN NO. 9: 11228 TO 12000 FEET MD, 8 1/2 INCH HOLE TOOL NUMBER AND TYPE: 1677-02, 4X MOD TF-1 A packed rotary assembly with Teleco's TC was tripped in the hole for Run 9. Drill rates varied with lithologies from 20 foot per hour to 70 foot per hour in sands. Angle was built from 91.8 degrees to 93.3 degrees, and then dropped to 88.8 degrees at TD. 772 feet of horizontal and inverted wellbore were completed during this run with 27 hours on bottom, the assembly was pulled to the shoe for the relog of the section mentioned in Run 8. Teleco experienced no trouble on this run and tools operated properly for the duration of this run and relog. TELECO RUN TOOL TYPE TOOL BIT # HOLE SIZE (in) BIT TYPE JETS (32") DEPTH IN DEPTH OUT (ft) FEET MADE AVG WOB (klb) FLOW RATE (gpm) PUMP PRESS (psi) MUD WEIGHT (lb/gal) DPR-TF3 1757-53 12 1/4 STC S85 3 x 14 1-12 7705 8950 1245 50 480 3700 10.5 Table 1: Teleco Run Summary DPR-TF3 1757-53 12 1/4 STC MFDSHC 3×14 1-12 8950 9182 232 45 480 3700 10.6 DPR-TF3 1757-53 12 1/4 STC MFDSHC 3 x 14 1-12 9182 9531 349 40 450 3500 10.6 MOD-TF1 1677-02 8 1/2 SEC S84 3 X 12 9531 9911 380 50 450 2350 9.0 MOD-TF1 1677-02 8 1/2 STC MF2 DL 3 X 12 9911 10289 378 45 450 3000 9.0 MOD-TF1 1677-02 8 1/2 Reed HP51AJS 3 X 12 10289 11228 939 45 450 2700 9.0 MOD-TF1 1677-02 10 8 1/2 HTC ATJ22 3 X 12 11228 12000 772 45 425 2950 9.1 SECTION NAME (1) BIT (2) MUD MOTOR (3) CROSS OVER (4) FLOAT SUB (5) NM STAB (6) NM LEAD COLLAR (7) NM STAB (8) CROSS OVER (9) TELECO DIR (10) NM STAB (11) MONEL (12) NM STAB (13) 3 MONELS (14) STAB (15) CROSS OVER (16) 1 HWDP (17) JARS (18) 28 HWDP BHA 91: 3505'-6114 ' SECTION SECTION SECTION CUMULATIVE LENGTH OD ID LENGTH ft in in ft 1.00 12.500 1.00 24.10 7.750 ..... 25.10 1.35 8.000 2.875 26.45 2.05 8.000 2.875 28.50 4.45 7.812 2.875 32.95 10.50 7.875 2.875 43.45 6.10 7.812 2.875 49.55 1.64 7.562 2.812 51.19 29.51 7.750 80.70 6.10 7.812 2.875 86.80 30.52 7.875 2.750 117.32 6.30 7.812 2.875 123.62 90.00 7.875 2.750 213.62 5.51 8.000 2.875 219.13 1.80 7.375 3.000 220.93 29.81 6.375 3.000 250.74 33.39 6.250 2.250 284.13 834.61 6.375 3.000 1118.74 SPECIAL BHA ITEMS: (1) Bit Run 9:2 (2) Mud Motor ( 5 ) Stab (7) Stab (9) Teleco (10) Stab OD: 12.25 (12) Stab OD: 12.25 (14) Stab Bit Type:Smith Flow Area:.466 Dynadrill F-2000 1 Degree Bent Housing # Blades:3 Blade Length:l.50 Blade OD:12.25 # Blades:3 Blade Length:l.50 Blade OD:12.25 Serial 9:257-63 Type:4xD-TF1 # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade OD:12.25 SECTION NAME BHA #2: 6114 '-7705 ' SECTION SECTION SECTION CUMULATIVE LENGTH OD ID LENGTH ft in in ft (1) BIT (2) MUD MOTOR (3) CROSS OVER (4) FLOAT SUB (5) NM STAB (6) NM LEAD COLLAR (7) NM STAB (8) CROSS OVER (9) TELECO DIR (10) NM STAB (11) MONEL (12) NM STAB (13) 3 MONELS (14) STAB (15) CROSS OVER (16) 1 HWDP (17) JARS (18) 28 HWDP 1.00 12.500 1.00 26.50 9.625 27.50 1.45 8.000 2.875 28.95 2.05 8.000 2.875 31.00 4.45 7.812 2.875 35.45 10.50 7.875 2.875 45.95 6.10 7.812 2.875 52.05 1.64 7.562 2.812 53.69 29.51 7.750 83.20 6.10 7.812 2.875 89.30 30.52 7.875 2.750 119.82 6.30 7.812 2.875 126.12 90.00 7.875 2.750 216.12 5.51 8.000 2.875 221.63 1.80 7.375 3.000 223.43 29.81 6.375 3.000 253.24 33.39 6.250 2.250 286.63 834.61 6.375 3.000 1121.24 SPECIAL BHA ITEMS: (1) Bit Run #:3 (2) Mud Motor (5) Stab (7) Stab (9) MWD (10) Stab OD:12.25 (12) Stab OD: 12.25 (14) Stab Bit Type:Smith Flow Area:.561 Dynadrill F-2000 1 Degree Bent Housing # Blades:3 Blade Length:l.50 Blade 0D:12.25 # Blades:3 Blade Length:l.50 Blade OD:12.25 Serial #:257-63 Type:4xD-TF1 # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade OD:12.25 BHA #3: SECTION SECTION NAME LENGTH ft (1) BIT 1.00 (2) MUD MOTOR 26.50 (3) CROSS OVER 1.45 (4) FLOAT SUB 2.05 (5) NM LEAD COLLAR 10.50 (6) NM STAB 6.10 (7) CROSS OVER 2.19 (8) TELECO DPR 42.51 (9) NM STAB 6.10 (10) MONEL 30.52 (11) NM STAB 6.30 (12) 3 MONELS 90.00 (13) STAB 5.51 (14) CROSS OVER 1.80 (15) 1 HWDP 29.81 (16) JARS 35.30 (17) 28 HWDP 834.61 7705'-8950' SECTION SECTION CUMULATIVE OD ID LENGTH in in ft 12.500 ...... 1.00 9.625 27.50 8.000 2.875 28.95 8.000 2.875 31.00 7.875 2.875 41.50 7.812 2.875 47.60 8.062 2.875 49.79 7.750 92.30 7.812 2.875 98.40 7.875 2.750 128.92 7.812 2.875 135.22 7.875 2.750 225.22 8.000 2.875 230.73 7.375 3.000 232.53 6.375 3.000 262.34 6.250 2.250 297.64 6.375 3.000 1132.25 SPECIAL BHA ITEMS: (1) Bit Run #:4 (2) Mud Motor (6) Stab (8) MWD ( 9 ) Stab OD:12.25 (11) Stab OD: 12.25 (13) Stab Bit Type:Smith Flow Area:.780 Dynadrill F-2000 1 Degree Bent Housing # Blades:3 Blade Length:l.50 Blade 0D:12.25 Serial #:1757-53 Type:4xDPR-TF3 # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade 0D:12.25 SECTION NAME (1) BIT (2) MUD MOTOR (3) CROSS OVER (4) FLOAT SUB (5) MONEL (6) NM STAB (7) CROSS OVER (8) TELECO DPR (9) NM STAB (10) 3 MONELS (11) STAB (12) CROSS OVER (13) 1 HWDP (14) JARS (15) 28 HWDP BHA #4: 8950'-9182' SECTION SECTION SECTION CUMULATIVE LENGTH OD ID LENGTH ft in in ft 1.00 12.500 1.00 24.10 7.750 ..... 25.10 1.35 8.000 2.875 26.45 2.05 8.000 2.875 28.50 30.52 7.875 2.750 59.02 6.10 7.812 2.875 65.12 2.19 8.062 2.875 67.31 42.51 7.750 109.82 6.10 7.812 2.875 115.92 90.00 7.875 2.750 205.92 5.51 8.000 2.875 211.43 1.80 7.375 3.000 213.23 29.81 6.375 3.000 243.04 35.30 6.250 2.250 278.34 834.61 6.375 3.000 1112.95 SPECIAL BHA ITEMS: (1) Bit Run #:5 (2) Mud Motor ( 6 ) Stab OD: 12. 188 (8) MWD (9) Stab (11) Stab Bit Type:Smith Flow Area:.561 Dynadrill F-2000 1 Degree Bent Housing # Blades:3 Blade Length:l.50 Blade Serial #:1757-53 Type:4xDPR-TF3 # Blades:3 Blade Length:l.50 Blade 0D:12.063 # Blades:3 Blade Length:l.50 Blade OD:12.063 SECTION NAME (1) BIT (2) MUD MOTOR (3) CROSS OVER (4) FLOAT SUB (5) NM STAB ( 6 ) MONEL (7) NM STAB (8) CROSS OVER (9) TELECO DPR (10) NM STAB (11) 3 MONELS (12) STAB (13) CROSS OVER (14) 1 HWDP (15) JARS (16) 28 HWDP BHA #5: 9182 '-9531' SECTION SECTION SECTION CUMULATIVE LENGTH OD ID LENGTH ft in in ft 1.00 12.500 1.00 24.10 7.750 25.10 1.35 8.000 2.875 26.45 2.05 8.000 2.875 28.50 4.45 7.812 2.875 32.95 30.52 7.875 2.750 63.47 6.10 7.812 2.875 69.57 2.19 8.062 2.875 71.76 42.51 7.750 114.27 6.10 7.812 2.875 120.37 90.00 7.875 2.750 210.37 5.51 8.000 2.875 215.88 1.80 7.375 3.000 217.68 29.81 6.375 3.000 247.49 35.30 6.250 2.250 282.79 834.61 6.375 3.000 1117.40 SPECIAL BHA ITEMS: (1) Bit Run #:5 (2) Mud Motor ( 5 ) Stab OD: 12.125 (7) Stab OD: 12. 188 (9) MWD (10) Stab (12) Stab Bit Type:Smith Flow Area:.561 Dynadrill F-2000 1 Degree Bent Housing # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade Serial #:1757-53 Type:4xDPR-TF3 # Blades:3 Blade Length:l.50 Blade OD:12.063 # Blades:3 Blade Length:l.50 Blade 0D:12.063 SECTION NAME (1) BIT (2) NB RWP ( 3 ) NM STAB ( 4 ) MONEL (5) TELECO TC (6) NM STAB (7) 3 MONEL ( 8 ) STAB (9) CROSS OVER (10) JARS (11) 35 HWDP SPECIAL BHA ITEMS: (1) Bit Run #:7 ( 3 ) Stab OD: 8.50 (6) Stab OD:8.50 (5) MWD ( 8 ) Stab BHA #6: 9531'-9911' SECTION SECTION SECTION CUMULATIVE LENGTH OD ID LENGTH ft in in ft .75 8.500 .75 6.55 7.000 2.875 7.30 5.55 6.250 2.813 12.85 30.60 6.250 2.750 43.45 71.40 6.750 114.85 5.55 6.250 2.813 120.40 91.95 6.250 2.750 212.35 5.67 6.250 2.875 218.02 1.42 6.250 2.500 219.44 35.30 6.250 2.250 254.74 1044.41 6.375 3.000 1299.15 Bit Type:Security S84 TFA:.331 # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade Serial #:1677-02 Type:4xMod-TF1 # Blades:3 Blade Length:l.50 Blade 0D:8.50 BHA #7: 9911'-10289' SECTION SECTION SECTION SECTION CUMULATIVE NAME LENGTH OD ID LENGTH ft in in ft (1) BIT .75 8. 500 .75 (2) MUDMOTOR 22.40 6.500 23.15 (3) CROSS OVER 1.30 6.500 2.750 24.45 (4) FLOAT SUB 1.70 6.250 3.000 26.15 (5) MONEL LC 9.50 6.125 2.750 35.65 (6) NM STAB 5.55 6.250 2.875 41.20 (7) TELECO TC 71.40 6. 750 112.60 (6) NM STAB 5.55 6.250 2.813 118.15 (7) 3 MONEL 91.95 6.250 2.750 210.10 (8) STAB 5.67 6.250 2.875 215.77 (9) CROSS OVER 1.42 6.250 2.500 217.19 (10) JARS 35.30 6.250 2.250 252.49 (11) 35 HWDP 1044.41 6.375 3.000 1296.90 SPECIAL BHA ITEMS: (1) Bit Run #:8 Bit Type:Smith MF2DL TFA:.331 (2) Dynadrill 1 degree steerable mudmotor (6) Stab # Blades:3 Blade Length:l.50 Blade 0D:8.50 (7) MWD Serial #:1677-02 Type:4xMod-TF1 (8) Stab # Blades:3 Blade Length:l.50 Blade OD:8.50 SECTION NAME (1) BIT (2) NB RWP (3) NM STAB (4) MONEL LC (5) MONEL LC (6) TELECO TC (7) NM STAB (8) 3 MONEL ( 9 ) STAB (10) CROSS OVER (11) JARS (12) 35 HWDP SPECIAL BHA ITEMS: (1) Bit Run #:9 (3) Stab 0D:8.50 (6) Stab 0D:8.50 (5) MWD (8) Stab BHA #8: 10289'-11228' SECTION SECTION SECTION CUMULATIVE LENGTH OD ID LENGTH ft in in ft .75 8.500 .75 6.55 7.000 2.875 7.30 5.55 6.250 2.813 12.85 9.50 6.125 2.750 22.35 10.00 6.125 2.75 32.35 64.28 6.750 96.63 5.55 6.250 2.813 102.18 91.95 6.250 2.750 194.13 5.67 6.250 2.875 199.80 1.42 6.250 2.500 201.22 35.30 6.250 2.250 236.52 1044.41 6.375 3.000 1280.93 Bit Type:Reed HP51 TFA:.331 # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade Serial #:1677-02 Type:4xMod-TF1 # Blades:3 Blade Length:l.50 Blade 0D:8.50 SECTION NAME (1) BIT (2) NB RWP ( 3 ) MONEL LC (4) NM STAB (5) MONEL LC (6) TELECO TC (7) NM STAB (8) 3 MONEL ( 9 ) STAB (10) CROSS OVER (11) JARS (12) 35 HWDP SPECIAL BHA ITEMS: (1) Bit Run #:10 (4) Stab OD:8.50 (7) Stab OD:8.50 (6) MWD (9) Stab BHA #9: 11228'-12000' SECTION SECTION SECTION CUMULATIVE LENGTH OD ID LENGTH ft in in ft .75 8.500 .75 6.55 7.000 2.875 7.30 9.50 6.125 2.750 16.80 5.55 6.250 2.875 22.35 10.00 6.125 2.750 32.35 71.29 6.750 ...... 103.64 5.55 6.250 2.813 109.19 91.95 6.250 2.750 201.14 5.67 6.250 2.875 206.81 1.42 6.250 2.500 208.23 35.30 6.250 2.250 243.53 1044.41 6.375 3.000 1287.94 Bit Type:Hughes ATJ22 TFA:.331 # Blades:3 Blade Length:l.50 Blade # Blades:3 Blade Length:l.50 Blade Serial #:1677-02 Type:4xMod-TF1 # Blades:3 Blade Length:l.50 Blade 0D:8.50 MUD INFORMATION RUN DEPTH WT PV YIELD PT GEL FIL CHL SAND SOLID CAKE Rm TEMP ft ppg cp lb/100ft 10s/10m cc mg/L % % ohm-m F 3 8440 10.5+ 17 17 5/11 4.7 1900 tr 14.0 1 0.782 144 4 8950 10.6 17 14 5/9 5.2 1900 tr 14.0 1 1. 192 120 5 9182 10.5+ 20 14 5/6 5.0 1600 tr 14.0 1 1.192 120 Change over to oilbase mud after setting 9 5/8 inch casing. 6 9730 9.0+ 10 12 10/15 N/A 15000 tr 12.0 3 7 10176 9.1 11 19 15/16 N/A 14000 tr 13.5 3 8 10850 9.0+ 10 17 14/15 N/A 14000 tr 14.0 3 9 11340 9.1+ 11 18 17/19 N/A 14000 tr 15.0 3 9 12000 9.2 11 20 17/19 N/A 12000 tr 14.0 3 N/A 126 N/A 140 N/A 150 N/A 162 N/A 164 IV. FORMATION EVALUATION FORMATION EVALUATION DS5-30 was drilled as a horizontal production well for Prudhoe Bay Drilling in the Prudhoe Bay Unit, located in the North Slope Borough of Alaska. Teleco dual propagation resistivity (DPR) services were used to identify known stratigraphic markers and pick the 9 5/8 inch casing point for the 12 1/4 inch hole. Triple combo logging services were used to perform a log analysis in the 8 1/2 inch hole and became log of record due to the high angle nature of the well. The triple-combo logging tools combine a dual propagation resistivity measurement, gamma ray, neutron porosity, bulk density, and directional services into a package that provides both downhole memory and real time data transmission to the surface. A 2 MHz electromagnetic wave is used to determine the resistivity measurement. Both phase difference and amplitude ratio resistivities are recorded providing a dual depth of investigation measurement. Of the two resistivity measurements the amplitude ratio gives the deeper depth of investigation. Natural formation gamma ray is provided by a scintillator detector which gives more accurate readings and allows for a higher data rate than earlier detection methods. Teleco's neutron tool utilizes a 5 curie Americium- Beryllium neutron source with two Lithium 6 detectors to provide a compensated neutron porosity measurement. The density tool uses a 2.5 curie Cesium 137 source which enables the two detectors to give a compensated bulk density and density porosity in addition to a photoelectric effect measurement and the density correction delta rho. Logging began slightly above the K-10 marker at a depth of 7705 feet measured depth. All depths referred to in this section are measured depths below the kelly bushing. Drilling continued through the Prince Creek-Schrader Bluff formations to the K-10 marker at a depth of approximately 7720 feet. The K-10 marker was picked using the gamma ray in conjunction with resistivity log response. Gamma ray was displaying a fluctuating response at the beginning of the logged interval with an abrupt drop to a slightly lower more stable level, while resistivity experienced a slight increase in value. The K-10 was picked where the gamma ray returned to its previous level. Directly above the K-10, some notable fluctuations were seen in both the gamma and resistivity logs. The K-10 marks the top of the Seabee formation. The Seabee formation, consisting primarily of interbedded siltstones and clays, typically fine to very fine grained, was drilled from the base of the K-10 marker to the end of bit run no. 3 at 8899 feet sensor depth. During this run the K-5 marker was encountered at a depth of approximately 8612 feet. Directly above the marker, there was a noted increase in gamma values as well as a slight increase in the resistivity curve. The K-5 occurred where the resistivity and gamma ray curves both dropped back to distinctly lower values. At a depth of approximately 8992 feet, the K-2 marker was seen on the log. This distinctive marker appeared as a sharp decreasing spike on the resistivity log. At the same time, the gamma trace began its upward ramp indicating the beginning of the HRZ directly below the K-2 marker. This zone is noted by its characteristic high gamma values. The Sag River sandstone appeared at a depth of approximately 9390 feet measured depth. This zone is best characterized by its abrupt, dramatic increase in the resistivity curve. It is also noted by several ratty spikes in the gamma trace near the top of the zone, which settle down to a level lower than previous formations. The last interval logged with the DPR tool, prior to pulling out of the hole for casing was at a depth of 9458 feet. At this point the traces indicated the beginning of the Shublik formation by the slight erratic nature of both the gamma ray and resistivity curves. The Shublik formation underlies the Sag River sand, the top of which was not logged due to the sensor standoff to the bit at casing point. The Shublik containing calcareous siltstone, shale and limestones was drilled to a depth of 9570 feet when a clean sand was drilled marking the top of the Sadlerochit group. This being a inverted horizontal production well the deepest vertical depth reached was within the Sadlerochit at a measured depth of approximately 11080 feet. Log response for the Sadlerochit indicated zones primarily of clean sandstones and siltstones interbedded with siltstone and shale. Approximately 920 feet of horizontal section was drilled accompanied by an approximate 20 feet of inverted vertical section. Neutron near/far overlays and neutron porosity/density porosity overlays were essential in gas -oil contact picks in an effort to keep the well path from re-entering or approaching any gas intervals. The quality of the real time log varied over the course of the well, ranging from excellent to fair. New signal filtering capabilities were used successfully in data acquisition over the course of the high angle section. The memory log was unaffected by any of the drilling parameters and provided an excellent high resolution log throughout the course of the well. V. DIRECTIONAL SURVEY DATA MEASURED DEPTH NO INTERPOLATION TELECO OILFIELD SERVICES INC ALASKA PRUDHOE BAY DRILLING Well Name Location Date Surveyed Job No. Survey Performed By : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope : SEP 26, 1991 : 847TAK : JOHN BURTON This survey is correct to the best of my knowledge and is supported by actual field data. ~ · ..~.~ .......... ~. .... co~~ ~~s~.~~w TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING ,~->~Well Name : DS5-30 I Location : Drill site # 5 : Prudhoe Bay : North Slope No Interpolation Date SEP 26, 1991 Filename. · 847TAK Plane of Vertical Section : 37.8' Latitude & Departure relate to : SLOT CENTER Vertical Section Originates at : SLOT CENTER Slot Coordinates : Lat 0.000ft : Dep 0.000ft Directions Referenced To : TRUE NORTH Depth at Drill Floor : 0.00 ft Calculation Method : MINIMUM CURVATURE Magnetic Declination :+30°48.000'E Platform north : +0° 0' 0'' (T) Grid convergence : +0.0000° TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING ~Well Name : DS5-30 Location : Drill site # 5 : Prudhoe Bay : North Slope No Interpolation Page 1 of 2 Date SEP 26, 1991 Filename : 847TAK MD C\L INC DIR ft ft deg deg 3455 0 1.0 175.0 3767 312 2.3 3.0 4021 254 6.4 21.3 4212 191 12.5 23.1 4402 190 14.2 25.5 TVD ft 3454.7 3766.6 4019.9 4208.2 4393.0 VS ft -1.4 1.7 19.5 49.7 92.4 LAT DEP D' LEG ft ft °/100 -23.0 27.3 0.0 -19.4 27.9 1.1 -1.2 33.3 1.7 27.8 45.3 3.2 67.7 63.4 0.9 4593 191 21.1 32.9 4784 191 24.7 32.2 4975 191 28.4 35.7 5166 191 31.0 37.1 5358 192 33.2 35.7 4575.0 4750.9 4921.7 5087.6 5250.3 149.6 223.6 308.7 403.3 505.3 117.8 92.2 3.8 180.5 132.1 1.9 251.2 179.9 2.1 327.3 236.1 1.4 409.4 296.6. 1.2 5579 221 39.9 33.3 5427 5895 316 38.8 33.6 5672 6214 319 39.6 36.1 5919 6532 318 39.8 33.6 6164 6850 318 40.0 34.0 6407 .7 .1 .3 .0 .9 636.6 836.4 1037.7 1240.5 1444.0 517.9 370.9 3.1 685.1 481.4 0.4 850.5 596.6 0.6 1017.2 712.6 0.5 1186.7 826.1 0.1 7168 318 40.4 38.5 7485 317 40.5 38.9 7797 312 40.4 42.1 8116 319 41.1 42.4 8437 321 41.7 42.1 6650 6892 7129 7371 7612 .9 .1 .5 .2 .0 1649.1 1854.7 2056.9 2264.5 2476.1 1352.1 947.4 0.9 1512.6 1076.0 0.1 1666.5 1207.4 0.7 1820.6 1347.4 0.2 1977.8 1490.2 0.2 8745 308 41.4 42.1 8995 250 43.9 38.9 9184 189 54.7 36.4 9439 255 54.1 38.5 9626 187 57.0 36.4 7842 8026 8149 8297 8403 .5 .4 .5 .9 .7 2679.8 2848.9 2992.0 3199.3 3353.5 2129.3 1627.1 0.1 2258.2 1737.0 1.3 2371.6 1824.2 5.8 2536.2 1950.2 0.7 2658.6 2044.0 1.8 9724 98 59.9 34.7 9819 95 62.8 33.3 9919 100 65.1 33.3 10011 92 65.7 37.8 10106 95 68.0 37.8 8455 8500 8544 8582 8620 .0 .5 .4 .7 .1 3436.9 3520.1 3609.6 3693.2 3780.5 2726.6 2092.5 3.3 2795.7 2139.1 3.3 2870.8 2188.4 2.3 2938.8 2237.0 4.5 3007.8 2290.6 2.4 10201 95 70.5 37.8 10296 95 72.8 37.5 10390 94 74.8 36.8 10485 95 77.1 35.7 10580 95 79.2 34.7 10676 96 81.3 34.3 10772 96 83.4 33.3 10867 95 85.7 32.2 10963 96 87.5. 31.5 11058 95 89.7 30.4 8653.7 8683.6 8709.9 8732.9 8752.4 8768.7 8781.5 8790.5 8796.2 8798.5 3869.4 3959.5 4049.8 4141.9 4234.8 4329.2 4424.2 4518.3 4613.7 4708.0 3078.0 2345.0 2.6 3149.4 2400.1 2.4 3221.3 2454.6 2.2 3295.6 2509.1 2.7 3371.6 2562.7 2.4 3608.2 2720.3 2.7 3689.6 2770.9 2.0 3771.0 2819.7 2.6 TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING !~el.1 Name : DS5-30 Location : Drill site # 5 : Prudhoe Bay : North Slope No Interpolation MD C\L INC DIR TVD ft ft deg deg ft 11154 96- 91.8 29.7 8797.2 11249- 95 93.3 30.1 8793.0 11343 94 92.7 29.7 8788.1 11438 95 92.4 28.7 8783.9 11533 95 91.1 28.0 8781.0 Page 2 of 2 Date SEP 26, 1991 Filename : 847TAK 11628 95 90.5 28.6 8779.6 11723 95 90.2 29.0 8779.1 11819 96 89.5 28.3 8779.3 11917 98 88.8 28.7 8780.8 VS LAT DEP D'LEG ft ft ft °/100 4803.1 3854.1 2867.8 2.3 4897.1 3936.4 2915.1 1.6 4990.1 4017.7 2961.9 0.8 5083.9 4100.6 3008.2 1.1 5177.6 4184.2 3053.3 1.6 5271.3 5365.1 5459.9 5556.6 4267.8 3098.3 0.9 4351.0 3144.1 0.5 4435.3 3190.2 1.0 4521.4 3236.9 0.8 Origin of Bottom Hole Closure SLOT Bottom Hole Closure 5561 ft 35.6° MEASURED DEPTH 00 INTERPOLATED TELECO OILFIELD SERVICES INC ALASKA PRUDHOE BAY DRILLING Well Name Location Date Surveyed Job No. Survey Performed By : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope : SEP 26, 1991 : 847TAK : JOHN BURTON This survey is correct to the best of my knowledge and is supported by actual field data. . .~.~~.. ~~ .... coMPANY REPRESENTATIVE TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING ?-~Well Name : DS5-30 I Location : Drill site # 5 : Prudhoe Bay : North Slope Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of ~ Plane of Vertical Section : 37.8° Latitude & Departure relate to : SLOT CENTER Vertical Section Originates at : SLOT CENTER Slot Coordinates : Lat 0.000ft : Dep 0.000ft Directions Referenced To : TRUE NORTH Depth at Drill Floor : 0.00 ft Calculation Method : MINIMUM CURVATURE Magnetic Declination :+30°48.000'E Platform north : +0° 0' 0'' (T) Grid convergence : +0.0000° Client Well Name Location TELECO OILFIELD SERVICES INC : PRUDHOE BAY DRILLING : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope Page 1 of 3 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of MD C\L INC DIR TVD VS ft ft. deg deg ft ft 3455 0 1.0 175.0 3454.7 -1.4 3500 45 1.2 150.2 3499.7 -1.0 3600 100 1.6 95.1 3599.7 0.0 3700 100 2.0 39.9 3699.7 1.0 3800 100 2.8 5.4 3799.5 4.0 3900 100 4.4 12.6 3899.2 11.0 4000 100 6.1 19.8 3998.9 18.0 4100 100 8.9 22.0 4097.8 32.0 4200 100 12.1 23.0 4196.4 47.8 4300 100 13.3 24.2 4293.8 69.5 4400 100 14.2 25.5 4391.1 4500 100 17.7 29.3 4486.4 4600 100 21.2 32.9 4581.4 4700 100 23.1 32.5 4673.5 4800 100 25.0 32.5 4765.2 4900 100 26.9 34.3 4854.6 5000 100 28.7 35.9 4943.4 5100 100 30.1 36.6 5030.3 5200 100 31.4 36.9 5116.4 5300 100 32.5 36.1 5201.1 91.9 121.7 152.3 191.0 230.7 275.3 321.1 370.6 421.4 474.5 5400 100 34.5 35.2 5284.0 530.3 5500 100 37.5 34.2 5364.3 589.7 5600 100 39.8 33.3 5443.9 649.9 5700 100 39.5 33.4 5521.3 713.1 5800 100 39.1 33.5 5598.6 776.3 5900 100 38.8 33.6 5675.9 6000 100 39.1 34.4 5753.4 6100 100 39.3 35.2 5830.9 6200 100 39.6 36.0 5908.4 6300 100 39.7 35.4 5985.5 839.5 902.6 965.8 1028.9 1092.6 6400 100 39.7 34.6 6062.4 1156.3 6500 100 39.8 33.9 6139.3 1220.1 6600 100 39.8 33.7 6216.1 1284.0 6700 100 39.9 33.8 6292.9 1348.0 6800 100 40.0 33.9 6369.6 1412.0 6900 100 40.1 34.7 6446.1 7000 100 40.2 36.1 6522.5 ~ 7100 100 40.3 37.5 6598.9 7200 100 40.4 38.5 6675.2 7300 100 40.4 38.7 6751.3 1476.3 1540.7 1605.2 1669.8 1734.7 LAT DEP D ' LEG ft ft '/100 -23.0 27.3 0.0 -22.5 27.4 0.0 -21.3 27.6 1.3 -20.2 27.8 1.7 -17.1 28.6 1.6 -9.9 30.7 1.7 -2.7 32.8 1.7 10.8 38.2 2.9 26.0 44.5 3.2 46.3 53.7 1.2 67.3 63.2 0.9 93.4 78.2 3.7 120.1 93.6 3.7 152.9 114.6 1.9 186.4 136.1 1.9 223.4 161.2 2.1 261.1 187.3 1.9 301.0 216.7 1.4 341.8 246.8 1.3 384.6 278.3 1.2 430.1 310.7 2.0 479.1 344.4 3.1 529.0 378.3 2.4 581.9 413.2 0.4 634.9 448.2 0.4 687.7 483.2 0.3 739.6 519.3 0.6 791.4 555.4 0.6 843.3 591.5 0.6 895.6 628.0 0.4 948.0 664.5 0.5 1000.4 700.9 0.5 1053.4 736.9 0.1 1106.7 772.6 0.1 1160.0 808.3 0.1 1212.7 845.2 0.5 1264.7 883.3 0.9 1316.7 921.5 0.9 1368.3 960.4 0.7 1418.9 1001.0 0.1 Client Well Name Location TELECO OILFIELD SERVICES INC : PRUDHOE BAY DRILLING : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope Page 2 of 3 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of MD C\L INC DIR TVD VS ft ft deg deg ft ft 7400 100 40.5 38.8 6827.4 1799.6 7500 100 40.5 39.1 6903.5 1864.4 7600 100 40.5 40.1 6979.6 1929.2 7700 100 40.4 41.1 7055.7 1994.0 7800 100 40.4 42.1 7131.8 2058.8 7900 100 40.6 42.2 7207.6 8000 100 40.8 42.3 7283.3 8100 100 41.1 42.4 7359.1 8200 100 41.3 42.3 7434.2 8300 .100 41.4 42.2 7509.2 8400 100 41.6 42.1 7584.2 8500 100 41.6 42.1 7659.1 8600 100 41.5 42.1 7734.0 8700 100 41.4 42.1 7808.8 8800 100 41.9 41.4 7882.9 8900 9000 9100 9200 9300 9400 9500 9600 9700 9800 9900 10000 10100 10200 10300 10400 1O5OO 10600 10700 10B00 10900 11000 11100 11200 11300 100 42.9 40.1 100 44.2 38.8 100 49.9 37.5 100 54.7 36.5 100 54.4 37.4 100 54.2 38.2 100 55.0 37.8 100 56.6 36.7 100 59.2 35.1 100 62.2 33.6 100 64.7 33.3 100 65.6 37.3 100 67.9 37.8 100 70.5 37.8 100 72.9 37.5 100 75.0 36.7 100 77.4 35.5 100 79.6 34.6 100 81.8 34.0 100 84.1 33.0 100 86.3 32.0 100 88.4 31.1 100 90.6 30.1 100 92.5 29.9 100 93.0 29.9 7956.5 8029.6 8094.8 8158.8 8217.0 8275.2 8332.4 8389.0 8442.4 8491.4 8536.1 8578.1 8617.7 8653.4 8684.8 8712.3 8736.0 8755.8 8771.9 8784.1 8792.4 8797.1 8798.0 8795.2 8790.4 2123.9 2189.0 2254.0 2319.8 2385.8 2451.7 2517.8 2583.9 2650.0 2717.0 2784.7 2852.7 2928.4 3005.0 3086.3 3167.6 3249.6 3332.0 3416.5 3503.4 3592.6 3683.2 3775.0 3868.4 3963.4 4059.5 4156.6 4254.5 4353.0 4451.9 4551.1 4650.4 4749.6 4848.6 4947.5 LAT DEP D'LEG ft ft '/100 1469.6 1041.5 0.1 1520.0 1082.3 0.2 1569.3 1124.5 0.7 1618.7 1166.6 0.7 1667.9 1208.8 0.6 1716.3 1252.6 0.2 1764.6 1296.5 0.2 1812.9 1340.4 0.2 1861.7 1384.8 0.2 1910.7 1429.3 0.2 1959.7 1473.7 0.2 2008.8 1518.2 0.0 2058.0 1562.7 0.1 2107.2 1607.1 0.1 2157.7 1651.3 0.7 2209.2 1695.3 1.3 2261.2 1739.3 1.5 2321.2 1785.4 5.8 2381.9 1832.1 4.8 2446.5 1881.5 0.7 2511.0 1931.0 0.7 2576.1 1980.8 0.9 2641.6 2030.9 1.8 2709.9 2080.6 2.9 2781.8 2129.8 3.3 2856.5 2179.0 2.5 2930.6 2231.2 3.7 3003.4 2287.2 2.3 3077.3 2344.4 2.6 3152.4 2402.4 2.4 3229.1 2460.3 2.3 3307.6 2517.5 2.6 3387.9 2573.8 2.4 3469.3 2629.5 2.3 3552.1 2684.3 2.5 3636.2 2'737.7 2.5 3721.3 2789.9 2.2 3807.4 2840.8 2.5 3893.9 2890.7 1.9 3980.5 2940.5 0.4 TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING f~->Well Name : DS5-30 ILocation .: Drill site # 5 : Prudhoe Bay : North Slope Page 3 of 3 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of ! MD C\L INC DIR TVD ft ft deg deg ft 11400 100 92.5 29.1 8785.6 11500 100 91.6 28.2 8782.0 11600 100 90.7 28.4 8780.0 11700 100 90.3 28.9 8779.2 11800 100 89.6 28.4 8779.3 11917 117 88.8 28.7 8780.8 VS LAT DEP D'LEG ft ft ft °/100 5046.4 4067.5 2989.7 0.9 5145.0 4155.1 3037.6 1.3 5243,6 4243.1 3085.1 0.9 5342.4 4330.9 3133.0 0.6 5441.1 4418.6 3181.1 0.8 5556.6 4521.4 3236.9 1.5 Origin of Bottom Hole Closure SLOT Bottom Hole Closure 5561 ft 35.6° TRUE VERTICAL DEPTH 100' INTERPOLATED TELECO OILFIELD SERVICES INC ALASKA PRUDHOE BAY DRILLING Well Name Location Date Surveyed Job No. Survey Performed By : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope : SEP 26, 1991 : 847TAK : JOHN BURTON This survey is correct to the best of my knowledge and is supported by actual field.data. COMPANY REPRESENTATIVE TELECO OILFIELD SERVICES INC Client : PRUDHOE BAY DRILLING : DSS- 0 ' Location : Drill site # 5 : Prudhoe Bay : North Slope Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of ~ Plane of Vertical Section : 37.8' Latitude & Departure relate to : SLOT CENTER Vertical Section Originates at : SLOT CENTER Slot Coordinates : Lat 0.000ft : Dep 0.000ft Directions Referenced To : TRUE NORTH Depth at Drill Floor : 0.00 ft Calculation Method : MINIMUM CURVATURE Magnetic Declination :+30°48.000'E Platform north : +0° 0' 0'' (T) Grid convergence : +0.0000° Client Well Name Location TELECO OILFIELD SERVICES INC PRUDHOE BAY DRILLING DS5-30 Drill site # 5 Prudhoe Bay North Slope Page 1 of 2 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of ~ MD C\L INC DIR ft ft deg deg 3455' 0 1.0 174.8 3500 45 1.2 150.0 3600 100 1.6 94.9 3700 100 2.0 39.7 3800 100 2.8 5.4 3901 4001 4102 4204 4306 4409 4514 4620 4729 4839 100 4.5 12.6 100 6.1 19.9 101 9.0 22.1 101 12.2 23.0 103 13.3 24.3 103 14.5 25.8 105 18.3 29.9 106 21.6 32.8 109. 23.7 32.4 110 25.8 33.2 4951 112 27.9 35.3 5065 114 29.6 36.4 5181 115 31.2 37.0 5299 118 32.5 36.1 5420 121 35.1 35.0 5544 125 38.9 33.7 5672 128 39.6 33.4 5802 129 39.1 33.5 5931 129 38.9 33.9 6060 129 39.2 34.9 6189 129 39.5 35.9 6319 130 39.7 35.3 6449 130 39.7 34.3 6579 130 39.8 33.7 6709 130 39.9 33.8 6840 130 40.0 34.0 6971 131 40.2 35.7 7101 131 40.3 37.6 7233 131 40.4 38.6 7364 131 40.5 38.7 7495 131 40.5 39.0 7627 131 40.5 40.4 7758 131 40.4 41.7 7890 132 40.6 42.2 8022 132 40.9 42.3 TVD ft 3455.0 3500.0 3600.0 3700.0 3800.0 3900.0 4000.0 4100.0 4200.0 4300.0 4400.0 4500.0 4600.0 4700.0 4800.0 4900.0 5000.0 5100.0 52OO.0 5300.0 5400.0 5500.0 5600.0 5700.0 5800.0 5900.0 6000.0 6100.0 6200.0 6300.0 6400.0 6500.0 6600.0 6700.0 6800.0 6900.0 7000.0 7100.0 7200.0 7300.0 VS ft -1.4 -1.0 0.0 1.0 4.0 11.1 18.1 32.3 48.4 70.9 94.6 126.0 160.1 202.2 248.1 297.9 353.4 411.1 473.8 542.1 616.1 695.7 777.5 859.1 940.6 1022.0 1104.6 1187.5 1270.6 1354.0 1437.4 1521.7 1606.1 1691.0 1776.2 1861.5 1946.6 2031.7 2117.4 2203.3 LAT DEP D' LEG ft ft '/100 -23.0 27.3 0.0 -22.5 27.4 0.0 -21.3 27.6 1.3 -20.2 27.8 1.7 -17.0 28.6 1.6 -9.8 30.7 1.7 -2.6 32.9 1.7 11.2 38.4 2.9 26.5 44.8 3.2 47.6 54.3 1.1 69.7 64.5 1.1 97.2 80.3 3.8 126.7 97.9 3.3 162.4 120.6 1.9 200.8 145.9 1.9 242.2 173.8 2.1 287.1 206.4 1.6 333.5 240.7 1.4 384.0 277.9 1.2 439.8 317.4 2.2 .501.0 359.3 3.1 567.4 403.6 0.6 635.8 448.8 0.4 703.8 494.4 0.3 770.7 541.0 0.6 837.6 587.6 0.6 905.5 634.9 0.3 973.6 682.3 0.5 1042.2 729.4 0.3 1111.7 775.9 0.1 1181.2 822.4 0.1 1249.4 872.1 0.9 1317.5 922.0 0.9 1384.8 973.6 0.5 1451.3 1026.9. 0.1 1517.7 1080.4 0.1 1582.5 1135.7 0.7 1647.3 1191.1 0.7 1711.4 1248.3 0.3 1775.2 1306.2 0.2 Client Well Name Location TELECO OILFIELD SERVICES INC : PRUDHOE BAY DRILLING : DS5-30 : Drill site # 5 : Prudhoe Bay : North Slope Page 2 of 2 Date SEP 26, 1991 Filename : 847TAK Interpolated 100 ft of q MD C\L INC DIR TVD ft ft deg deg ft 8154 132 41.2 42.4 7400.0 8288 133 41.4 42.2 7500.0 8421 133 41.7 42.1 7600.0 8555 134 41.6 42.1 7700.0 8688 134 41.5 42.1 7800.0 8823 135 42.2 41.1 7900.0 8959 136 43.5 39.4 8000.0 9108 149 50.4 37.4 8100.0 9271 163 54.5 37.1 8200.0 9443 172 54.2 38.5 8300.0 9619 177 56.9 36.5 8400.0 9818 198 62.8 33.3 8500.0 10055 237 66.8 37.8 8600.0 10355 300 74.0 37.1 8700.0 11917 %1562 88.8 28.7 8780 .8 VS ft 2289.8 2377.7 2465.5 2553.9 2642.2 2732.7 2824.7 2934.5 3062.6 3202.4 3348.1 3519.2 3733.6 4015.9 5556 LAT DEP D'LEG ft ft '/100 1839.4 1364.5 0.2 1904.7 1423.8 0.2 1969.9 1483.1 0.2 2035.6 1542.5 0.1 2101.4 1601.9 0.1 2169.6 1661.5 0.7 2239.7 1721.2 1.3 2326.0 1789.2 4.7 2427.6 1867.1 2.5 2538.6 1952.1 0.7 .6 2654.3 2040.7 2794.9 2138.6 2970.7 2261.8 3194.3 2434.1 4521.4 3236 1.8 3.3 2.4 2.4 .9 7.9 Origin of Bottom Hole Closure SLOT Bottom Hole Closure 5561 ft 35.6° VI. TELECO SERVICES SURFACE SYSTEMS TELECO SERVICES TR2300-039 M-SERIES: MODULAR DUMPER. · 1.33 SOFTWARE 3.6 FT2 SOFTWARE MWD TOOLS - TYPE (*) 4X DPR-TF3 4X MOD-TF1 DATA TRANSMISSION 4X MILLER CODE 4X MILLER CODE SIZE S/N 7 3/4" 1757-53 6 3/4" 1677-02 MEASURED PARAMETERS DIRECTIONAL: INCLINATION, AZIMUTH TOOL FACE ORIENTATION DOWNHOLE: DUAL PROPAGATION RESISTIVITY NATURAL GAMMA RAY BULK DENSITY NEUTRON POROSITY DOWNHOLE CIRCULATING TEMPERATURE SURFACE: KELLY HEIGHT RATE OF PENETRATION (ROP) WEIGHT ON BIT (WOB) HOOK LOAD (Klbs) PUMP PRESSURE (*) Explanation of Tool Types 4X DPR-TF3: 4X Data Rate, Dual Propagation Resistivity-Tool Family 4 Downhole Memory Dual Propagation Resistivity Natural Gamma Ray Detection Downhole Temperature Directional Package 4X MOD-TFi: 4X Data Rate, Modular Double-Triple Combo Tool Family 1 Downhole Memory Dual Propagation Resistivity Natural Gamma Ray Detection Bulk Density Neutron Porosity Downhole Temperature Directional Package ARCO ALASKA, INC. F'.O. BOX i08360 ANCHORAGE, ALASKA DATE' ~ 2-~ 3-9~ REFERENCE: ARCO DIRECTIONAL DATA :~-~0 9--26-9t MWD - DIRECTIONAl_ ,S'URVEY ~l,.{~ ~ 5..-2.4 t (~-28.-.~2~ ~"iWQ -- mlF(l=C I ZONAL. ~URVEY PL..EASE ,S'i~N ,:~~;I'URN~5~F'I'ACHE~,. CUH HAVE A NI~E DAY~' $ONYA WAL. L. ACE A'FO-t 529 ,.JOB~847 JOB;;850 Y AS RE:CE I PT OF' DA FA, APPROVEI) ~ TRANS:; 9t TELECO I'EI_ECO DISTRIBUTION CENTRAL. FILES CHEVRON D & M .. EXTENSION EXPLORAI'ION · .~ EXXON MARATHON MOBIL PHILLIPS · ,-~ PB WELL FILES (2 COPIES) R & D ~~ BF'X STATE OF ALASKA TEXACO RECEIVED DEC 1 6 19~i ~Caorago ,,, ARCO Ai..ASKA, INC~ ANCHORAGE, ALASKA DATE' i 2-i 3-9i REFERENCE' ARCO FiAGNETIC TAPE(S) WITH LISTING(S) ~.~-.-:'~ ,,~,,~-2~/,~ ~-~w~, .- ~P/~/~:u'r~o~ Pu~ :~.-,~ '~'~'~"~''" ':~"' ~'~/~V RE:]E IvED ........ SONYA WALLACE ATO-i 529 I) I STR I BUI'I ON CENTRAL FILES (CH) CHEVRON D & M I'AMMAS BROWN (OH/GCI') EXXON MARAI'HON MOBIL · 'f' F' I_ [."' C 0 F'HILLIF'S F'B WELl._ F:'ILE:S BPX STATE OF ALASKA TEXACO DATE' t 0-9-9t REF"ERENCE ARCO CASED HOLE I"-INAI...£' 9 - 5 t")- -- 9 i E-tk R U N 7-i S--9t DSN RUN ? '- ¥ ;'0 -- ¥' 1:2'EE, NENTED BOND/C:-h:/CCL RLIN 9-24-9t VERTILOG (9 '5/8" CA~;ING) RUN i 0-3--°t,. VERT]:LOG ,-'o,, _.:; "8"/ CA3'INU) i',,'UN 9 -'28 - 9 t P ER F N U N , ,t,O-'--2-- 91 COLLAR-PERF F.'.UN 9-28-9 i C OLL A R-F' E F:F RUN i ¢-4-9t PERF RLJN iN AND F,:E i"URN TI-tE AT'I'6~CHED COF"fRA~*C~i~iD F'LEA~E ~.?I ' OF DATA, RECE:ZVE: ., OCT 15 1991 HAVE A NICE'VDAY!/ Alaska Oil & Gas Cons. Co,~ , Anchorage ,..~ SONY~ UALL. ACE AF'F'ROVE'D DISTRIBUTION · ,~ CENTRAL FILES -t- F'H ILL I I-"£' '" CHEVRON F'B WELL F]:I._E~.' D & M R & D ~: EXTEN.~. ION ExF'LORATION $ BF'X :~ EXXON ¢, STATE OF ALA2'KA MAF,'ATHON TE'XACO :~ MOBIL ANCHORAGE., ALA3'KA DATE· i 6~-i i -9i RI.':'FERiFNCE' ARCO OPEN HOLE FINAl..,?;~ ~!- OIii- oi 'n-7~'.., 2-3 '2 .-~. ¢, gl- 0~ ~5- o~ / 5-3¢, 9/4-i7/9i RWD - DF'R.,/GR ~- HD 9/4- i '7, ,.'"m i, n'WD., . .- i'iBD/GR - MD 9/4-i7/9i RWD - HDP/MNF'/GR- ND 9/4-t7/¥'t RWD MN/Gl:;,' N,.HK C;OUN'¥3'- ND 9/4-t7/;7t RWD - MN/GR FAR C.'.'C)UNi-:~/- fid 9/4-i ',""/9i RWD -- MDF'/HNF'/DF'R/(.~F::- i'VD 9/4-i 7/9i F;:Wi)- MDF'/"MNF'/i)F'R/(:;-R-x TVD 9/i6-26/9i RWI) - DF'R/GR '/ MD 9/t 6-26/9i RWD -- HBD/GR ''/' MD 9/i 6--26/9i RWD '--HDF'/MNF'/(.:.-R "' ND 9/i6--26/9i F:.:WD'- HN/'GR NE:AR COL.INI'£TM MD /i6 .-.5/'.9i RWD - MN/Gp FAt::' COUN'I'~' ,/ MD 9/i ~--"~-"- ,--o D i"VD · .., ~...,, ,-,i RW - MDt::'/MNI-':'/DF:'F::/GR,--" 9/'i 6-26/9i RWD - HDP/HNF'/DF'R/GRv, TVD t::'I._E'A~E ;~IGN AND RE-t"URN 'I"FtE ATi'ACHE:D COF'Y A~' RECFZF'T OF DATA, RECEIVE __ HAVE A i'-tlCE DAY! / $ONYA WALLACE ATO- i 5°°.~. , AF'F'F,'OVEI) "FRAN,S':~: 9 t "I' EL. ECL "l" E L_ I£ C' C, T EL.I.:_CL, i'E L E C' 0 'i' EL..ECC 'i'EI_FCO T E L F.:: C C TEL_ECC' TEI._ECO TELECO 'f'E.L. ECU i I.-LFCO I'ELECO T E L i: C O i) 1 '~5 'l R i B l.J i' i U t,4 ¢ C EN'['I:;.:AL F'iLEZ :~ F'Pi i LL i 1::'5' ~: CHEVI:'-.'ON .,.'"' F'B WLL. L F:ILL~" ~ D ~- M R ~ D ";: "t F' "l '' · 11: EXTEN3'ION [:.z,F-L..IF~A I ION :~: BF'X -.-'"' EXXON, -.--"- ,.,':-." T A T PZ, UFA L A ?; K A · ,,.~" H A R A T H 0 N ~,."'T E X A C 0 ..-'"' HOBIL MEMORANDUM Stale of Alaska ~ASKA OIL MD GAS CONSERVATION COMMISSION TO: Lonnie C Smit~ DATE: October 4, 1991 Commiss loner FILE NO: HH104-7. DOC TELEPHONE NO: THRU: SUBJECT: Rig/BOPE Inspection AAI PBU DS-5-30 Prudhoe Oil Pool FROM: Harold R Hawki~ Petr Inspector Sunday..September.15, 1991: I performed a Rig/BOPE inspection for AAI PBU DS 5-30, on Doyon Rig 9. There were no infractions. I filled out an AOGCC Rig/BOPE inspection report which is attached. In summary, the Rig/BOPE inspection went satisfactorily at AAI PBU DS 5-30. Attachment 02-00lA (Rev. 6/89) 20/11/MEMO1.PM3 STATE OF ALASKA ~LASKA OIL AND GAS CONSERVATION.COMMISSION Rtg/BOPE Inspection Report OPERATION: Drlg / Compl . Operator Location: Sec Drlg contr Location (gen~l)/ ' ~<~;/ .. IN COMPLIANCE; yes no n/a A. DIVERTER 2 5. 6. Wkvr UIC Permit # R/J,'F ~. Ri g# Well sign line sz & length ) line conn& anchored ) bifurcated & dwn wind ) 90° targeted turns ) vlvs: auto & simultaneous l) annular pack-off 7.() () 8.(~' () 9. (~,~ ( ) 10. (~/)' ( ) 11. (~) ( ) ~2. (~ ( ) 13. (~)' ( ) ~4. (~/" ( ) ~5. (/~/' ( ) 16. (J,'~/~( ) ~7. (~)" ( ) 18. (/~/ ( ) 19. (.~/' ( ) 2o. ,,() 21. (b),~'() 22. ((/)/ ( ) 24. (~) ( ) 25. (~ ( ) 26. (v~ ( ) 27. (~ ( ) 28. (//)' ( ) ~9. (KF () 30. (~ ( ) 31 (Y') ( ) 32. (v') () Well name Representative ) condition B. BOP STACK ( ) wellhead flg wkg press ( ) stack wkg press ( ) annular preventer ( ) pipe rams ( ) blind rams ( ) stack.anchored 44. (~)' ( ) ( ) chke/ktll line sz 45. (~)~ ( ) ( ) 90° turns targeted (chke & kill ln) 46. (~)' ( ) IN COMPLIANCE% yes no n/~ 33. (~ ( ) (). ftrewa11 3~. (I~) ( ) ( ) nitrogen power source (back-up) 35, (~)/ ( ) ( ) condition (leaks, hoses, etc) D. MUD SYSTEM 36. (~)' ( ) ( ) pit level floats installed 37. (~)' ( ) ( ) flow rate sensors 38. (~)~ ( ) ( ) mud gas separator '. 39. (~ ( ) ( ) degasser 40. (~ ( ) ( ) separator bypass 41. (-~ ( ) ( ) gas sensor 42. (~' ( ) ( ) chke In corm 43. (t~ ( ) ( ) trip tank E. RIG FLOOR ( ) kelly cocks (upper,lower,IBOP) ( ) floor vlvs (dart vlv, ball vlv) ( ) kelly & floor vlv wrenches 47. (~ ( ) ( ) driller's console (flow monitor, flow rate indicator, pit level indicators, gauges) 48. ( ~)~ ( ) ( ) kill sheet up-to-date 49. (~'' ( ) ( ) gas ~etection monitors (H S & methane) 50. (~ ( ) ( ) hydr chke panel 51. (~ ( ) ( ) chke manifold F. MISC EQUIPMENT 52. (C~ ( ) ( ) flare/vent line 53. (~)~ ( ) ( ) 90~ turns targeted (dwn strm choke Ins) 54. (~ ( ) ( ) reserve pit tankage 55. (~)~ ( ) ( ) personnel protective equip avail 56. (~)~ ( ) ( ) all dr1 site suprvs trained for procedures 57. (~ ( ) ( ) H2S probes 58 (~ ( ) ( ) rig housekeeping ( ) HCR vlvs (chke & kill) ( ) manual vlvs (chke & kill) ( ) connections (flgd, whd, clmpd) ( ) dr1 spool ( ) flow nipple ( ) flow monitor ( ) control lines fire protected C. CLOSING UNITS ( ) wkg press ( ) fluid level ( ) oprtg press ( ) press gauges ( ) sufficient vlvs ( ) regulator bypass ( ) 4-way vlvs (actuators) ( ) blind handle cover ( ) driller control ~panel ( ) remote control panel RECORDS: Date of last BOP inspection: Resulting non-compliance: Non-compliances not corrected & why: Date corrections will be completed: BOP test & results properly entered on daily record? Kill sheet current? C.0013 (rev 07/08/91) September 5, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Michael zanghi Area Drilling Engineer ARCO Alaska, Inc. P. O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit DS 5-30 ARCO Alaska, Inc. Permit No. 91-115 Sur. Loc. 1560'SNL, 36'WEL, Sec. 31, TllN, R15E Btmhole Loc. 2385'SNL, 1863'WEL, Sec. 29, TllN, R15E Dear Mr. Zanghi: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. " The CommissiOn.will .advise you of those BOPE teSt that it wishes to witness. David~. Jo~nston,-Chairman Alaska~D42_~nd Gas Conservation Commission BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ' ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 Re-Entry [] Deepen131 Service [] Development Gas [] SingleZone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. KBE -- 70'feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28326 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 1560' SNL, 36' WEL, SEC. 31, T11N, R15E Prudhoe Bay Unit At top of productive interval 8. Well number Number 3175' SNL, 2475' WEL, SEC. 29, T11N, R15E DS 5-30 U-6300610 At total depth 9. Approximate spud date Amount 2385' SNL, 1863' WEL, SEC. 29, T11N, R15E September 11, 1991 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(UDandTVD) p rope~L line 28325 @ 1863' feet DS 5-23/60' @ surface feet 2560 12036'MD/8765'TVD~eet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 39oo{eet Maximum hole angle 92 o Maximum surface 2700pslg At total depth (TVD) 18. Casing program Specifications Setting Depth raze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 WELD 80' 35' 35' 115' 115' 2000 # POLESET 16" 13-3/8" 68# ~(.ss/,soBTC 3465' 35' 35' 3500' 3500' 1295 sx CSIII & 400 sx Class 'G" 12-1/4" 9-5/8" 47# L-80 B TC/MOD 4465' 35' 35' 4500' 4493' 12-1/4" 9-5/8" 47# L-80 BTC/MOD 5001' 4500' 4493' 9501' 8355' 440 sx Class "G" 8-1/2" 7" 29# L-80 BTC 1835' 9201' 8161' 11036' 8800' 335 sx Class "G" 8-1/2" 4-1/2" 11.5~ L-80 FL4S 1250' 10786' 8795' 12036' 8765' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate S ~ ~ 0 3 '{991 Production Liner ~.0il & Gas Cons. Perforation depth: measured "~"' Anch0rag~' '~' .... true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs de~pth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements r-I 21. I hereby ce~fy ,t'hat/the f.J.,oreg~g is true and correct to the best of my knowledge Signed /c'{[(~,~.~(., ~/..%~,~( Title AreaDrilling Engineer DateF-~/~"~r~/ ' ' L-.//' ]~. Commission Use Only Permit_Number lAir number IApprov~l da.te__ ,~, ISee cover letter ~'/-//,.5' J50-o~?'.--z~.~./3, J ~'"~- "--('Z'/ Jfor other requirements Conditions of approval Samples required [] Yes ~I~NO Mud log required []Yes .12]' No Hydrogen sulfide measures [] Yes ~ No Directional survey requ~recl ~ Yes [] NO Required worki~pressurefo.rB.~OPE 1-12M; r-]3M; ]~5M; F"IIOM; []15M; Other:~. ~' ~ by order of Appr~..~L. ~~ Commissioner tne comm,ssion Date --orm 10-401 Submit · . . . . . · . . 10. 11. DS5-30 OPerations Summary MIRU drilling rig. Spud well and drill 16" vertical hole to 3500'tvd/3500'md. Set 13 3/8" casing and cement same. Test casing to 2500 psi for 30 minutes. Nipple up BOPs and test same to 5000 psi. Pick up 12 1/4" BHA and drill 10' of new hole and perform leakoff test. Drill vertical hole to 3900'tvd/md (KOP#1). Then build 'ang!e at 2.5 degrees/100' in the N 37' 47" E direction to 40.96 degrees at 5402'tvd/5538'md (EOC#1). Hold angle at 40.96 degrees to 8012'tvd/8994'md (KOP#2). At KOP#2, begin building angle again at 2.5 degrees/100'md in the N 37' 47" E direction to 8355'tvd/9501'md (9 5/8" casing point). · Set 9 5/8" casing and cement same. PU 8 1/2" BHA and test casing to 3000 psi. Drill 10' of new 8 1/2" hole and perform formation integrity test to 12.5 ppg EMW. Switch to oil base mud, then drill 8 1/2" hole while continuing to build at 2.5 degrees/100'md to 92 degrees at 8800'tvd/11036'md (EOC#2 and 7" casing point). At EOC#2, maintain angle (92 degrees) and direction of N37' 47"E to TD of 8765'tvd/12036'md. (Sadlerochit formation will be logged via MWD tools). RIH and spot polymer/salt pill at the 7" set point of 8800'tvd/11036'md (false bottom). Run and set the 7" liner at 8800'tvd/11036'md and cement same. (NOTE: The 7" casing point may change due to the depth of the gas-oil contact). Clean out 7" liner and test to 3000 psi for 30 minutes. RIH with cement evaluation logs. Clean out open hole and set 4 1/2" slotted liner and production packer. Circulate well to brine. Run 4 1/2" x 3 1/2" tubing string. Freeze protect well. NU tree and test to 3000 psi. Release rig. / ECEIVED Alas/~a 0il & Gas Cons. C0mmissien Anchorage DS5-30 Operations. Summary-continued a. Excess non-hazardous fluids developed from well operations and as necessary to control fluid level in reserve pit will be pumped down the 13 3/8" x 9 5/8" annulus. The annulus will be left with a non-freezing fluid during any extended period and will ultimately be sealed with 300 sxs of cement followed by Arctic Pack. b. Wells within 200' of the proposed well are (depths are relative to DS5-30) DS5-31: 178' at 1580'md and diverges at 4400'md. DS5-16: 103' at 3940'md and diverges at 3940'md. DS5-15: 106' at 4140'md and diverges at 4140'md. DS5-26: 85' at 2580'md and diverges at 2580'md. DS5-23: 60' at surface and diverges at surface. c. The drilling fluid program and fluid surface system will conform to the regulations set forth in 20AAC25.033. d. The maximum surface pressure is based upon the BHP and a full column of gas to TD (0.10 psi/ft). e. Based upon previous logs obtained from DS5 wells, no productive zones are anticipated above 4000'tvd. f. No hazardous levels of H2S are anticipated in this well. Mud Program for SIImhole WelI-PBU-EOA Date 8127191 Well DS5-30 Field Prudhoe Bay Type HAW Depth, tvd Denalty, ppg Vlacoaity Spud 8.8 300 to to to 13 3/8' csg point 9.4 130 SET 13 3~8" CASING Depth, tvd Denaity, ppg Vlacoeity 13 3/8" csg pt <9.4 35 to to to 5000° 10.5 40 5000' 10.5-6 40 to to to 9 5/8" csg pt 10.5-6 45 For casing 10.5-6 40 to 45 SET 9 5/8" CASING Depth, tvd Density, ppg Vlecoeity 9 5/8' csg pt to TD 8.8-9.1 SET 7" Liner and 4 1/2" Slotted Liner PH PV, cp YP, #1ft Int Gel 10 rain Gel FL cc/30mln OII, % 9 14 70 to to to 9.5 8 40 <25 50+ I~ PH PV, cp YP, #lit Int Gel 10 min Gel FL ccl30mln OII, % 9 6 6 1 2 10 0 to to to to to to to 9 8 8 2 4 12 0 g 15 8 6 8 lowered to 6cc 0 to to to to to by K10 shale to 9 18 12 10 12 0 9.5 12 to 16 5 to 7 1 to 2 2 lo 4 same as above 0 Pti PV, cp YP, #1ft Int Gel 10 mln Gel FL ccl30mln OII, % 10 to 20 15 to 25 8 to 10 8 to 20 7to 8 85 to 95 Solida, % 4 to 8 Solide, % 3 to 6 10 to 14 10 to 14 Sollde, % 8 to 10 Mud Type GeI-Benex Spud Mud GeI-Benex Spud Mud Mud Type LSND LSND L,SND I_SND LSND Mud Type OII Base Mud 8127/91 IPRUDHOE Structure ' D.S. 5 Field' Prudhoe Be), BAY DRILLING Well' 50 Location · North Slope, Alaska Created by : jones For-' C HURST Date plotted : 24-Aug-g1 [Plot Reference is 30 Version 14 ICoordinates ore in feet reference slot ~.30. ITrue VerticallEAS MAN DepthsTare reference wellhead o o o o · · 400 _ -~ ~00- o _ 120o- 2000- 4000 - - 4400- - 5200- _ 5600- _ _ 6400- RKB ELEVATION: 70' Easf --> 400 800 1200 1600 2000 2400 I I i i i i I I I I I I g200 KOP TVD=sgo0 TMD=,:3900 DEP=O N 57 DEG 47 MINE 4657' (TO TARGET) BUILD 2.5 DEG / 100' ID LOCATION; I 2385' FNL, 1863' F£L SEC. 29, T1 1Nt R15E TARGEt LOCATION: 3175' FNL, 2475' FEL SEC. 2g~ T11N, R15E TARGET TVD-8800 TMD-II036 OEP-4637 NORTH 3665 EAST 2841 TARGET ANGLE 92 DE(3 SURFACE LOCATION: 1560' FNL, 36' FEL SEC. 31~ TI 1N, R15E EOC I1TVD=5402 TMD=5538 DEP=561 UGNU SANDS AVERAGE AN(3LE 40,96 DE(; i i 1 i i i i o 400 800 1200 KOP f2 1'VD=8012 TMD=8994 DEP=2827 ~AG RIVER LCUSHUi~I_iK TOP SAOI.EROCHr~ BUILD 2.5 DE(; / lO0' G/O CONIAC/ Scale 1 ' 200.00 i i i i i i i i i i i i i i i i i i i i i i i 1600 2000 2400 2800 .32003600 4000 4400 4800 5200 5600 6000 Verf|col Section on 37.78azlmufh wlfh reference 0.00 N, 0.00 [ from slof 2800 3200 3600 I I I I I - 48OO - -4400 - - 4000 - -3,6OO _ -3200 _ -2800 _ -2400 - _ -1600 - t200 1.3 3/8"CSG PT lVD=3500 TMD=3500 DEP=0 K-15 TVD=4780 1MD=480..3 DEP=176 UGNU SNDS 1VD=5660 TM0=5880 DEP=785 K-12 TVD=6610 TMD=7138 DEP=1609 K-tO TVD=7070 TMD=7747 DEP=2009 K-5 IVD=7770 TMD=8674 DEP=2616 LCU h/D=8220 TMD=9287 DEP=3052 SAG RIVER TVD=B262 TMD=9351 DEP=30BO SHUBLIK lVO=8305 TMD=g41g DEP=3133 9 5/8"C5G Pl' TVD=8355 l'MD=,9501 DEP=5198 T/ SADLEROCHIT TVD=8365 TMD=9518 DEP=3212 O/O CONTACT 1~D=8680 TMD-10206 DEP=3821 TARGET - B/ IVISHAK - 7"UNER - FINAL EOC TVD=8800 TMD=11036 DEP=4657 TD 1~/D=8765 TMD~12036 DEP=5637 /X I I Z O 350 3O0 250 200 150 100 5O 5O 100 150 100 50 0 I I I I PRUDHOE BAY DRILLINO D.$. 5. WELL NO, 30 - _ .I I - _ - I -~_~ _ _ 5O 6400 6200 / 6000/ / / t 46OO ! / /~440 4200 ~oo '~*~ 5600 5800 2400 2200 000 100 I 150 I / / /"'4800 /' )00 3200 3000 2800 6O0 2OO I 25O 3OO I I ! 34p0 / ,/ /<5200 100 50 0 50 lO0 t 150 I 2OO I 250 300 _ 350 _ 300 _ 250 _ 200 _ ~50' _ 100 _ 50¸ _0 _ 5O _ 100 150 -DOYON DRILLING RIG'-~# 9 MUD SYSTEM SANDTRAP CENTRIFUGE 83 BBLS , DESILTER PIT 97 BBLS 97 BBLS ,, PILL PIT 3 6 BBLS 36 BBLS , , SHAKER DESANDER SHAKER MUD Cr.~.ANER ,,, SUCTION PIT 448 BBLS MIX PIT 122 BBLS '1' ~ ~ -t ~ - ~ m ~ ~ RECEIVED S E P 0 3 1991 Alaska Oil & Gas Cons. (;ommissio~'~ Anchorage 13-5/8" 5000 psi BOP STACK DIAGRAM I PIPE RAM~ .~ BLIND RAM~_~ s. OOL lL jd d PIPE RAMS ~_~.~ 1CASING ~ SPOOL '~ BRADEN r~ HEAD ~ ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVIOR TO THE PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT THE ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH THE CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRES- SURE. 13-5/8" STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH A NON-FREEZING FLUID. 2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED. MARK THE RUNNING JOINT WITH PREDETERMINED PLUG SEATING DEPTH. RUN THE TEST PLUG ON DRILL PIPE AND SEAT IN WELL- HEAD .... 3. CLOSE ANNULAR PREVENTER AND UPSTREAM VALVES . 4. FUNCTION TEST CHOKES. 5. IN EACH TEST, FIRST HOLD 250 PSI FOR 3 MINUTES PRIOR TO THE HIGH PPRERSSURE TEST. 6. INCREASE PRESSURE ON ANNULAR TO 3000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 7. OPEN ANNULAR PREVENTER AND CLOSE TOP PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 8. CLOSE VALVES DIRECTLY UPSTREAM OF THE CHOKES AND OPEN CHOKES. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 9. OPEN TOP SET OF PIPE RAMS. CLOSE BOTTOM PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 10. TEST REMAINING MANIFOLD VALVES (IF ANY) WITH 5000 PSI UPSTREAM OF THE VALVE AND ZERO PRESSURE DOWNSTREAM. 11. BLEED PRESSURE TO ZERO. OPEN BOTTOM PIPE RAMS. 12. BACK OFF RUNNING JOINT AND POH. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 3 MINUTES. 13. BLEED OFF ALL PRESSURE. OPEN BLIND RAMS. FILL MANIFOLD AND LINES WITH NON-FREEZING FLUID. SET ALL VALVES IN THE DRILLING POSITION. 14. TEST STANDPIPE VALVES TO 5000 PSI. 15. CHECK DEGASSER OPERATION. 16. RECORD BOP TEST INFORMATION ON THE BOP TEST FORM SIGN AND SEND TO DRILLING SUPERVISOR. 17. PERFORM COMPLETE BOP TEST WEEKLY AND FUNCTION TEST DAILY. DOYON 9 DIVERTER SYSTEM ARCO ALASKA, INC. FILL-UP UNE RISER FLOWUNE 20" 2[XX] ~ DIVERTER NOTE: I, i 1(7' BALL VALVE 1(7' BALL VALVE I ! ! 1, I I CONDUCTOR I ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND VENT LINE. THE SECOND VENT LINE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS THIS IS A VARIANCE FROM 20AAC25.035. · : · · · i RIG MODULES ~ DiVERTER UNES DISCHARGE 100 FT. FROM RIG IGNITION SOURCE. ALL TURNS ARE TARGETED TEES. ARCO Alaska, Inc. ~ Post Office r=,.,x 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 December 19, 1990 Mr. C. V. Chatterton Commissioner · State of Alaska Alaska Oil & Gas Conservation Commission ~001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 5-23,28,30,31, DS 9-47, & L5-31 Dear Mr. Chatterton: Enclosed are copies of the subject As-builts for your information. If you have any questions, please call me at 263-4618. Sincerely, Engineering Aide DW cc: File W1-1 RECEIVED DEC 2 0 ]990 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARCO Alaska?~ Post O~.i . B,,., 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 November 5, 1990 Mr. W. D. McGee Regional Supervisor Northern Regional Office Alaska Dept. of Environmental Conservation 1001 Noble Street, Suite 350 Fairbanks, Alaska 99701 RE: Annulus Pumping - Change in Surface Hole Location Well DS 5-30 Pei"rr~ii. 8740-DB002 Dear Mr. McGee: ARCO Alaska, Inc. wishes to inform you of an error in the surface location of a well that was included in an October 26, 1990 request for approval to use additional annuluses. The surface location of well DS 5-30 should be changed to: 1560' FNL, 35' FEL, Sec. 31, T11N, R15E, UM If you have any questions, please call me at 265-1547. David W. Hanson Associate Permit Coordinator Prudhoe Bay/Lisburne L. Smith - AOGCC ARCO Alaska, Inc. is a Subsidiary of AttanticRichfieldCompany AR3E~-6003-C CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE DATE. [~ thru ~]" (3) Admin [~~.~~~i3]'?/~-?~//~/ ~-,d-f/ [10 & 13] [14 thru 22] [23 thru 28] [29 thr~ ~1]' (6) Other (6) Addl le e 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Company YES Is permit fee attached ............................................... /~. Is well to be located in a defined pool ............................... ~ .... Is well located proper distance from property line ................... Is. well located proper distance from other wells ..................... Lease & Well ~/~Z ~-_ ~:?.~ ~ / /~,/~' ~,3' 3"-~) NO REMARKS Is sufficient undedicated acreage available in this pool ............. L ......... Is well to be deviated & is wellbore plat included ................... ~. .... Is operator the only affected party .................................. L .... can permit be approved before 15-day wait ............................ ~_ ,,, Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease nLrnber appropriate .......................................... Does well have a unique name & ngrnber ................................ 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface $ intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams $ descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to 5~oo psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. geol ogy' DWJ~ RP~j~ eng i nee r i ng;~ MTM ~ .. LC S ~/&,!ii:',~ BEW]~ RAD~ J H~_~Z~ INITIAL GEO1 UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE , ,, Add it ional remarks: rev 03/29/91 jo/6.011 0 -rz ~0 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. L~S VERiFiCaTiON L~ST~NG FOR~ PRUD...C= ""~" '~'~'"' ? '"',..' O~~'/ RECEIVED PRUDHOE BAY ~IT DEC 1 6(~ ~s BE~N D~PT. S.ZFTED)~~~ ~a~ka Oil t ~as Cons. Command)on ~n~horaflo Copyright 1987,1988,19&9,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. All rights reserved. PROGRAM' TAPESCAN REVISION' 2.53 Start of execution: Thu 21 NOV 91 8:34a ~ = = E C H O I N G I N PARAMETERS - = ! INPUT PARAMETER FiLE: TAPESCAN.iNP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 123456789012345678901234567890123456789012345678901234567890123456789012 AUTOCURV . = AUTOFILE = 1 COMMENTS = INFORECS = 1 LISTMETHOD = 1 , ! Automatic Curve renaming: 0=OFF, 1 =ON , !Automatic FILE= generation: 0=OFF, 1 =ON 1 , ! Decode LIS Comment records: 0=OFF, I=ON , ! Decode LIS Information records: 0 = NO, 1 =YES 0 , ! Usting Method: 0=depth units 1=tape units STATS = 0 FORCETYP = WRITEASCII = WRITETAP = SPLITLIS = 1 LISTFREQ = 25, ! Listing Frequency: Every n Units LISTMAX = 0 , ! Usting Maximum (0=no limit, value=list limit) , ! Statistics generation: 0 = OFF, 1 = ON 0 , ! (1 = BIT,2 = LIS ... thru 35 =Array Accoustic) (see table) 1 , ! If 1, all ascii files will be written (file0001.dat,etc.) 1 , ! Write Tape-Image File: 0=NO, I=YES , ! If 1 and WRITETAP on, split LIS logical files to physical SUBFILES = /0/, ! Tape Subtile write selection 0NRITETAP must be on) INTERPOLATE ='YES' ! Set up for TAPE2WDS to interpolate datums ('YES'or'NO') END T = U S E R I N P U T P A R A M E T R AUTOCURV = 1 , AUTOFILE = 1 , COMMENTS = 1 , INFORECS = 1 LISTMETHOD = 0 , LISTFREQ = 25, LISTMAX = 0, STATS = 0 FORCETYP = ~) , WRITEASCII = 1 , WRITETAP = 1 , SPLITLIS = 1 SUBFILES = /0/, INTERPOLATE ='YES' END !-- PROCESSING INTERVAL FROM 0.000 TO 0.000 ............. ! !-- CONSTANT PARAMETERS ........................................... ! AUTOCURV= 1.00000 AUTOFILE= 1.00000 COMMENTS= 1.00000 FORCETYP = 0.000000E +00 INFORECS = 1.00000 LISTFREQ = 25.0000 LISTMAX = 0.000000E +00 LISTMETH = 0.000000E+00 SELFTEST= 0.000000E +00 SPLITLIS = 1.00000 STATS = 0.000000E+00 WRITEASC= 1.00(XX) WRITETAP= 1.00000 dpcoef = 1.00000 dpcte = 1.0(X3(X) drlength = 0.000000E + 00 listwave = 0.000000E + 00 maxrecln = 0.000000E + 00 minrecln = 0.000000E +00 nsamples= 0.000000E+00 numcurvs= 0.0(XXX~E+00 numdatar = 0.000000E +00 numrecfl= 0.000000E+00 tfendep = 0.000(X~E+00 tflevsp = 0.000000E + 00 tfstdep = 0.000000E + 00 wcrbot = 0.000000E+ 00 wcrlevsp = 0.000000E + 00 wcrtop = 0.000000E + 00 !-- ARRAY PARAMETERS .............................................. ! SUBFILES( 1) = 0.000000E+00 SUBFILES(3) =-9999.00 SUBFILES(5) =-9999.00 SUBFILES(7) =-9999.00 SUBFILES(9) =-9999.00 SUBFILES(11) = -9999.00 SUBFILES(13) = -9999.00 SUBFILES(15) = -9999.00 SUBFILES( 17) = -9999.00 SUBFILES( 19) = -9999.00 SUBFILES(21) = -9999.00 SUBFILES(23) = -9999.00 SUBFILES(25) = -9999.00 SUBFILES(2) =-9999.00 SUBFILES(4) =-9999.00 SUBFILES(6) =-9999.00 SUBFILES(8) =-9999.00 SUBFILES(10) = -9999.00 SUBFILES(12) = -9999.00 SUBFILES(14) = -9999.00 SUBFILES(16) = -9999,00 SUBFILES(18) = -9999.00 SUBFILES(20) = -9999,00 SUBFILES(22) = -9999,00 SUBFILES(24) = -9999.00 SUBFILES(26) = -9999.00 SUBFILES(27) SUBFILES(29) SUBFILE$~ 31) SUBFILES(33) SUBFILES(35) SUBFILES(37) SUBFILES(39) SUBFILES(41) SUBFILES(43) SUBFILES(45) SUBFILES(47) SUBFILES(49) SUBFILES(51) SUBFILES(53) SUBFILES(55) SUBFILES(57) SUBFILES(59) SUBFILES(6i) SUBFILES(63) SUBFILES(65) SUBFILES(67) SUBFILES(69) SUBFILES(71) SUBFILES(73) SUBFILES(75) SUBFILES(77) SUBFILES(79) SUBFILES(81) SUBFILES(83) SUBFILES(85) SUBFILES(87) SUBFILES(89) SUBFILES(91) SUBFILES(93) SUBFILES(95) SUBFILES(97) SUBFILES(99) SUBFILES(101) SUBFILES(103) SUBFILES(105) SUBFILES(107) SUBFILES(109) SU BFI LES(111 ) SUBFILES(113) SU BF! LES(115) SU BFI LES(117) = -9999.00 = -9999.00 = -9999,00 = -9999.00 =-9999.00 =-9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.OO = -9999.OO = -9999.00 = -9999.00 = -9999.00 = -9999.OO = -9999.00 = -9999.00 = -9999.O0 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.OO = -9999.00 = -9999.00 = -9999.00 = -9999.OO = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.OO =-9999.OO = -9999.00 -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 SUBFILES(28) = -9999.00 SUBFILES(30) = -9999.00 SUBFILES(32) = -9999.00 SUBFILES(34) = -9999.00 SUBFILES( 36)-= -9999.00 SUBFILES(38) = -9999.00 SUBFILES(40) SUBFILES(42) SUBFILES(44) SUBFILES(46) SUBFILES(48) SUBFILES(50) SUBFILES(52) SUBFiLES(54) SUBFILES(56) SUBFILES(58) SUBFILES(60) SUBFILES(62) SUBFILES(64) SUBFILES(66) SUBFILES(68) SUBFILES(70) SUBFILES(72) SUBFILES(74) SUBFILES(76) SUBFILES(78) SUBFILES(80) SUBFILES(82) SUBFILES(84) SUBFILES(86) SUBFILES(88) SUBFILES(90) SUBFILES(92) SUBFILES(94) SUBFILES(96) = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 -- -9999.00 = -9999.00 -- -9999o00 -- -9999.00 = -9999.00 = -9999.OO = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999,00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999.00 = -9999,00 SUBFILES(98) = -9999.00 SUBFILES(100) = -9999.00 SUBFILES(102) : -9999,00 SUBFILES(104) = -9999.00 SUBFILES(106) = -9999.00 SUBFILES(108) = -9999.00 SUBFILES(110) = -9999.00 SUBFILES(112) = -9999.00 SUBFILES(114) = -9999.00 SUBFILES(116) = -9999.00 SUBFILES(118) = -9999.00 SUBFILES(119) = -9999.00 SUBFILES(121) = -9999.00 SUBFILES(123) = -99g~.00 SUBFILES(125) = -9999.00 SUBFILES(127) = -9999.00 SUBFILES(120) = -9999.00 SUBFILES(122) = -9999.00 SUBFILES(124) = -9999.00 SUBFILES(126) = -9999;00 SUBFILES(128) = -9999.00 !-- STRING PARAMETERS INTERPOL= YES Input Tape Device, LU (1) is: TAPEC: Output Tape-Image file, LU (2) is: J:\DATA\TAK\847.TAP (Output Tape-Image file wiil be created) Listing Method ("LISTMETH") = 0, Depth Unit oriented listing. Listing Frequency ("LISTFREQ") is every ( 25) units of Depth. Listing output limiting (LISTMAX) not enabled... (to enable list limiting set LISiMAX positive) Data Statistics reporting ("STATS") has not been enabled. (Specify STATS= 1 to enable this feature) Automatic curve renaming is enabled. (This is the program default, AUTOCURV= 1) (Specify AUTOCURV=0 to disable this feature) Automatic "FILE =n" card generation has been enabled by user input (AUTOFILE = 1). LIS comment record decoding (COMMENTS= 1) has been enabled by user input. LIS information record decoding (INFORECS= 1) has been enabled by user input. User has enabled the WRITEASC option... (all ASCII subfiles will be written out to FILEnnnn. DAT) Tape Subfile 1 is type: US **** REEL HEADER **** MWD 847 01 PRUDHOE BAY DRILLING WELL DS5-30 **** TAPE HEADER **** MWD 91/10/29 847 01 PRUDHOE BAY DRILLING WELL DS5-30 Tape Subfile: 1 Minimum record length: Maximum record length: 2 records... 132 bytes 132 bytes Tape Subfile 2 is type: LIS LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 TAPE HEADER PRUDHOE BAY UNIT _ MWD/MAD LOGS WELL NAME: -- APl NUMBER: OPERATOR: LOGGING COMPANY: -- TAPE CREATION DATE: JOB DATA -- BIT RUN1 DS5-30 20-029-22213 PRUDHOE BAY DRILLING · TELECO OILFIELD SERVICES 19 NOV 91 BIT RUN2 BIT RUN3 JOB NUMBER: 847 847 847 LOGGING ENGINEER: D. LENTZ R. GEHRES D. LENTZ OPERATOR WITNESS: G. COOPER WILLOUGHBY WILLOUGHBY BIT RUN4 BIT RUN5 BIT RUN6 JOB NUMBER: LOGGING ENGINEER: " OPERATOR WITNESS: SURFACE LOCATION - SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) ._ KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 847 847 T. FOSTER WILLOUGHBY 31 11N 15E 1560 75.00 73.00 35.00 847 J. CONNER T. SHYR WILLOUGHBY WILLOUGHBY OPEN HOLE CASING DRILLER'S BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1 ST STRING 16.000 13.375 3497.0 2ND STRING 12.250 3RD STRING 8.500 PRODUCTION STRING # REMARKS: $ 9.625 9522.0 **** FILE HEADER **** MWD .001 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.2500 FILE SUMMARY PBU TOOL CODE START DEPTH' MWD $ 7630.0 12000.0 STOP DEPTH 7716.0 7708.0 7950.0 7942.0 8065.0 8057.0 8249.0 8242.0 8525.0 8520.0 8799.0 8791.0 9074.0 9063.0 9145.0 9134.0 BASELINE CURVE FOR SHIFTS: GRCH02 CURVE SHIFT DATA (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH GRAM 9270.0 926O.0 9316.0 93O6.0 9396.O 9387.0 9548.O 9534.0 9723.0 9715.0 9792.O 9783.0 9855.0 9847.0 9873.0 9865.0 10150.0 10142.0 10229.0 10220.0 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD MWD MWD MWD MWD MWD MWD $ # REMARKS: $ # CN WN FN COUN STAT 4 7630.0 8899.0 5 8899.0 9114.0 6 9114,0 9458.0 7 9520.0 9864.0 8 9864.0 10246.0 9 10246.0 11192.0 0 11192.0 11963.0 DATA IN THIS FILE HAS BEEN DEPTH SHIFTED. : PRUDHOE BAY DRILLING DS5-30 PRUDHOE BAY · NORTH SLOPE :ALASKA LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS (DEPTH SHIFTED) EDITED MERGED MWD. * FORMAT RECORD (TYPE# 64) _ Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) _ Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 1213141516 0 0 0 1 0 O0 0000 1 000 1 Rep Code Count Bytes 68 12 48 Sum: 12 48 48 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name 1 RHOB 2 PEF 3 DRHO 4 GR 5 NPHI 6 RA 7 ROP 8 RP 9 FCNT 10 NCNT 11 FET 12 WOBS Code Samples Units 68 1 G/C3 68 1 BN/E 68 1 G/C3 68 i GAPi 68 1 PU-S 68 1 OHMM 68 1 FPHR 68 1 OHMM 68 1 CPS 68 1' CPS 68 1 HR 68 1 KLBS Size Length 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 48 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicate, s: 19 FRAMES * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 921 Tape File Start Depth = 7630.000000 lape File End Deptl3 = 12000.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 30538 datums Tape Subtile: 2 1024 records... Minimum record length: 58 bytes Maximum record length: 994 bytes Tape Subtile 3 is type: LIS · · **** FILE HEADER **** MAD .002 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: 0.2500 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH MAD 10227.0 $ MERGED DATA SOURCE PBU TOOL CODE MAD $ _ Cf REMARKS: $ _ Cf CN WN -- FN COUN STAT 10572.0 MAD RUN NO. MAD PASS NO. 1 1 10227.0 10572.0 MERGE TOP DATA IN THIS FILE HAS BEEN DEPTH SHIFTED. PRUDHOE BAY DRILLING DS5-30 PRUDHOE BAY NORTH SLOPE ALASKA MERGE BASE LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS (DEPTH SHIFTED) EDITED MERGED MAD. · , * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 12 13 14 15 16 000 1 000 0 0 00 1 000 1 Rep Code Count Bytes 68 12 48 Sum: 12 48 48 fndun a [F ] 1.00000000 3 ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name I RHOB 2 PEF 3 DRHO 4 GR 5 NPHI 6 RA 7 ROP 8 RP 9 FCNT 10 NCNT 11 FET' 12 WOBS Code Samples Units Size 68 1 G/C3 4 68 1 BN/E 4 68 1 G/C3 4 68 1 GAPI 4 68 1 PU-S 4 68 1 OHMM 4 68 1 FPHR 4 68 1 OHMM 4 68 1 CPS 4 68 1 CPS 4 68 I KLBS 4 68 I 4 Length 4 4 4 4 4 4 4 4 4 4 4 4 48 ** Routine LEVONE detects data discrepancy: DSB indicates: I FRAMES Data Record Length in'dicates: 19 FRAMES * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 73 Tape File Start Depth = 10227.000000 Tape File End Depth = 10572.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code deCoding summary: Rep Code: 68 2426 datums Tape Subfile' 3 99 records... Minimum record length: Maximum record length: 62 bytes 994 bytes Tape Subfile 4 is type: LIS **** FILE HEADER **** MAD .O03 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 3 EDITED MAD PASSES Depth shifted and clipped curves for each pass of each run in separate files. 1 1 O.250O MAD RUN NUMBER: MAD PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE -- START DEPTH STOP DEPTH MAD 10227.0 10572.0 -- PLEASE IGNORE THE DATA BELOW CONCERNING THE DEPTH SHIFT POINTS. _ THIS IS A SOFTWARE BUT. ATLAS HAS BEEN INFORMED AND IS CURRENTLY WORKING ON THE PROBLEM, THIS DOES NOT AFFECT THE DEPTH SHIFT DATA IN ANY WAY, THIS IS ONLY A LISTING OF THE POINTS SELECTED, BASELINE CURVE FOR SHIFTS: GRCH02 CURVE SHIFT DATA (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH GRAM 7716.0 7708.0 7950.0 7942.0 8065.0 8057.0 8249.0 8242.0 8525.0 8520.0 8799.0 9074.0 9145.0 ' 9270.0 9316.0 9396.0 9548.0 9723.0 9792.0 9855.0 9873.0 10150.0 10229.0 $ REMARKS: $ CN WN FN COUN STAT 8791.0 9063.0 9134.0 9260.0 9306.0 9387.0 9534.0 9715.0 9783.0 9847.0 9865.0 10142.0 10220.0 DATA FOR THIS FILE HAS BEEN DEPTH SHIFTED, : PRUDHOE BAY DRILLING DS5-30 : PRUDHOE BAY : NORTH SLOPE . ALASKA LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS (DEPTH SHIFTED) EDITED MAD. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 12 13 14 15 16 000 1 0000000 1 000 1 Rep Code Count Bytes 68 12 48 Sum: ' 12 48 48 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Code Samples Units Size Length 1 RHOB 2 PEF 3 DRHO 4 GR 5 NPHI 6 RA 7 ROP 8 RP 9 FCNT 10 NCNT 11 FET 12 WOBS 68 1 G/C3 4 4 68 1 BN/E 4 4 68 1 G/C3 4 4 68 1 GAPI 4 4 68 1 PU-S 4 4 68 1 OHMM 4 4 68 1 FPHR 4 4 68 1 OHMM 4 4 68 1 CPS 4 4 68 1 CPS 4 4 68 1 KLBS 4 4 68 1 4 4 48 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 19 FRAMES * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 73 Tape File Start Depth = 10227.000000 Tape File End Depth = 10572.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet - **** FILE TRAILER **** LIS representation code deCoding summary: Rep Code: 68 32964 datums Tape Subtile: 4 120 records... Minimum record length: -- Maximum record length: 62 bytes 994 bytes Tape Subtile 5 is type: LIS **** FILE HEADER **** MWD .004 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 7630.0 8899.0 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (Er): BOTTOM LOG INTERVAL (F'I'): BIT ROTATING SPEED (RI'M): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 17 SEP 91 M1.32 M1.32 MEMORY 0.0 763O,O 8899.0 0 40.0 41.6 TOOL NUMBER MWD $ · DUAL PROPAGATION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (F--F): 1757-53 12.250 9522.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD EH: MUD CHLORIDES (PPM): FLUID LOSS (C3): LSND 10.50 0.0 0,0 1900 4.7 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRA'i'E AT MT: 0.000 MUD GAKE Al' MT: 0.000 1.600 0.782 0.0 0.0 67.0 144.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 12.250 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 2 REMARKS: $ CN : PRUDHOE BAY DRILLING WN DS5-30 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT :ALASKA LIS COMMENT RECORD(s): 123456789012345678901234567890123456789012345678,90123456789012345678901234567890 DATA FOR THIS FILE CONTAINS BIT RUN 4. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null dat~.'value is: -99g.25(X)00 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 910111213141516 0 O0 1 0 O0 0 O0 0 1 000 1 Rep Code Count Bytes 68 27 108 Sum: 27 108 108 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 27 Curves: Name Code Samples Units Size Length 1 ARCM 68 1 -dB 4 4 2 RHOB 68 1 G/C3 4 4 3 C~M 68 1 MMHO 4 4 4 CACM 68 1 MMHO 4 4 5 CPAM 68 1 MMHO 4 4 6 CPCM 68 1 MMHO 4 4 7 PEF 68 1 BN/E 4 4 8 DPLM 68 1 PU 4 4 9 DPSM 68 1 PU 4 4 10 DRHO 68 1 G/C3 4 4 11 GRAM 68 1 GAPI 4 4 12 GR 68 1 GAPI 4 4 13 GRCM 68 1 GAPI 4 4 14 NPAM 68 1 PU 4 4 15 NPLM 68 1 PU 4 4 16 NPHI 68 1 PU-S 4 4 17 NPSM 68 1 PU-S 4 4 18 PDCM 68 1 DEG 4 4 19 RAAM 68 1 OHMM 4 4 20 RA 68 1 OHMM 4 4 21 ROP 68 1 FPHR 4 4 22' RPAM 68 1 OHMM 4 4 23 RP 68 1 OHMM 4 4 24 RPDM 68 1 OHMM 4 4 25 RPTM 68 I MINS 4 4 26 TCDM 68 I DEG 4 4 27 WBCS 68 I KLBS 4 4 108 ** Routine LEVONE detects data discrepancy: DSB indicates: .. 1 FRAMES Data Record Length indicates: 9 FRAMES * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 565 '"lape i~iie STart Depth = 7630.000000 Tape File End Depth = 8899.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 24001 datums Tape Subtile: 5 632 records... Minimum record length' Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: US **** FILE HEADER **** MWD .005 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 - FILE HEADER FILE NUMBER: 5 RAW MWD -- Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: 0.2500 -- # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 8899.0 9114.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: ._ DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): -- TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RI'M): -- HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 19 SEP 91 M1.32 M1.32 MEMORY 0.0 8899.0 9114.0 0 41.6 51.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER MWD $ · DUAL PROPAGATION 1757-53 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 12.250 9522.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G)' MUD VISCOSITY (S): MUD PH: MUD L;HLORIDES (PPM)' FLUID LOSS (C3): LSND 10.60 20.0 8.0 1900 5.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: 0.000 MUD CAKE AT MT: 0.000 1.900 1.192 0.0 0.0 74.0 120.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 12.250 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 2 REMARKS: INTERVAL FROM 8899 TO 8950 FEET MD (7957 TO 7996 FEET TVD) WAS LOGGED 19.5 HOURS AFTER BEING DRILLED. $ CN : PRUDHOE BAY DRILLING WN DSS-30 FN : PRUDHOE BAY COUN . NORTH SLOPE STAT :ALASKA LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS BIT RUN 5. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) - Entry Typ~(12) Size(4) Repcode(68) Null data value is: -999.2~ Entry Type(16) Size(1) Repcode(66) _ Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 121314 15 16 0 0 0 1 0 0 0 0 0 (3 t3 ! 0 0 O 1 -- Rep Code Count Bytes 68 27 108 Sum: 27 108 108 fndun a [F ] 1.0000000.0_ ONE DEPTFi PER FRAME Tape depth ID' F 27 Curves: Name Code Samples Units Size Length 1 ARCM 68 2 RHOB 68 3 C.~_~.~. 68. 4 CACM 68 5 CPAM 68 6 CPCM 68 7 PEF 68 8 DPLM 68 9 DPSM 68 10 DRHO 68 11 GRAM 68 12 GR 68 13 GRCM 68 14 NPAM 68 15 NPLM 68 16 NPHI 68 17 NPSM 68 18 PDCM 68 19 RAAM 68 20 RA 68 21 ROP 68 22 RPAM 68 23 RP 68 24 RPDM 68 25 RPTM 68 26 TCDM 68 27 WBCS 68 -dB 4 4 G/C3 4 4 MMHO 4 4 MMHO 4 4 MMHO 4 4 MMHO 4 4 BN/E 4 4 PU 4 4 PU 4 4 G/C3 4 4 GAPI 4 4 GAPI 4 4 GAPI 4 4 PU 4 4 PU 4 4 PU-S 4 4 PU-S 4 4 DEG 4 4 OHMM 4 4 OHMM 4 4 FPHR 4 4 OHMM 4 4 OHMM 4 4 OHMM 4 4 MINS 4 4 DEG 4 4 KLBS 4 4 108 ** Routine'LEVONE detects data discrepancy: DSB indicates: I FRAMES Data Record Length indicates: 9 FRAMES * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 96 Tape File Start Depth = 8899.000000 Tape File End Depth = 9114.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code deCoding summary: Rep Code: 68 36688 datums Tape Subtile: 6 164 records... Minimum record length' Maximum record length: 62 bytes 1014 bytes Tape Subtile 7 is type: US **** FILE HEADER **** MWD .006 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: ~ RAW MWD Curves and log header data for each bit run in separate tiles. BIT RUN NO: 6 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 9114.0 9458.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SO--ARE VERSION: DOWNHOLE SO--ARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (Fr): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BO'I-rOM) VENDOR TOOL CODE TOOL TYPE 19 SEP 91 M1.32 M1.32 MEMORY 0.0 9114.0 9458.0 0 51.4 54.1 TOOL NUMBER MWD $ DUAL PROPAGATION 1757-53 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 12.250 9522.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): LSND 10.50 43.0 8.0 1600 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT. MEASURED TEMPERATURE (MT): 1.800 MUD AT MAX CIRCULATING TEMPERATURE: 1,186 MUD FILTRATE AT MT: 0.0(30 0.0 MUD CAKE AT MT: 0.0(30 0,0 72.0 128,0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 12.250 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 2 REMARKS: INTERVAL FROM 9108 TO 9182 FEET MD (8105 TO 8154 FEET TVD) WAS LOGGED 9.5 HOURS AFTER BEING DRILLED. $ CN PRUDHOE BAY DRILLING WN : DS5-30 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT :ALASKA LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS BIT RUN 6. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Tyl~e(12) Size(4) Repcode(68) Null data value is: -999.25(:XXX) Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 1213 14 15 16 000 1 0000000 1 000 1 Rep Code Count Bytes 68 27 108 Sum: 27 108 108 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 27 Curves: Name Code Samples Units Size 1 ARCM 2 RHOB 3 CAAM 4 CACM 5 CPAM 6 CPCM 7 PEF 8 DPLM ' 9 DPSM 10 DRHO 11 GRAM 12 GR 13 GRCM 14 NPAM 15 NPLM 16 NPHI 17 NPSM 18 PDCM 19 RAAM 20 RA 21 ROP 22 RPAM 23 RP 24 RPDM 25 RPTM 26 TCDM 27 WBCS 68 1 -dB 4 68 1 G/C3 4 68 1 MMHO 4 68 1 MMHO 4 68 1 MMHO 4 68 1 MMHO 4 68 1 BN/E 4 68 1 PU 4 68 1 PU 4 68 I G/C3 4 68 1 GAPI 4 68 1 GAPI 4 68 I GAPI 4 68 1 PU 4 68 1 PU 4 68 1 PU-S 4 68 1 PU-S 4 68 1 DEG 4 68 1 OHMM 4 68 1 OHMM 4 68 I FPHR 4 68 1 OHMM 4 68 1 OHMM 4 68 1 OHMM 4 68 1 MINS 4 68 I DEG 4 68 I KLBS 4 108 Length 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ** Routine'LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 9 FRAMES * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 153 Tape File Start Depth = 9! 14.000000 Tape File End Depth = 9458.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 29888 datums Tape Subtile: 7 221 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subtile 8 is type: US **** FILE HEADER MWD .007 1024 LIS COMMENT RECORD(s): 123456789012345678901234567890123456789012345678,90123456789012345678901234567890 FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: 0.2500 # FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 9520.0 9864.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (F'I'): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 22 SEP 91 M1.32 M1.32 MEMORY 0.0 9520.0 9864.0 0 54.1 62.8 TOOL STRING (TOP TO BOTI'OM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER MWD $ NEUTRON/POROSITY 1677~32 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.5O0 9522.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): OILBASE 9.20 10.0 0.0 1500O 0.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT.MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: 0.0(30 MUD CAKE AT MT: 0.000 0.000 0.000 0.0 0.0 0.0 0.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 2 REMARKS' DRILLER'S DEPTH OF 9 5/8 INCH CASING SHOE IS 9520 FEET MD (8345 FT TVD). LOGGER'S DEPTH OF 9 5/8 INCH CASING SHOE IS 9522 FEET MD (8346 FT TVD). INTERVAL FROM 9458 FEET MD TO CASING SHOE WAS LOGGED IN CASING. INTERVAL 9520 TO 9531 FEET MD (8345 TO 8351 FT TVD) WAS LOGGED APPROXIMATELY 54 HOURS AFTER BEING DRILLED. THIS SECTION WAS ORIGINALLY DRILLED AS A 12 1/4 INCH HOLE, BUT LOGGED WITH A TRIPLE COMBO TOOL WITH 8 1/2 INCH BOREHOLE CORRECTIONS. EXCESSIVELY HIGH RESISTIVITY VALUES WERE CALCULATED BY RESISTIVITY SENSOR FROM 9600 TO 11200 FEET MD (8372 TO 8798 FT TVD). $ CN : PRUDHOE BAY DRILLING WN : DS5-30 FN : PRUDHOE BAY COUN, : NORTH SLOPE STAT :ALASKA LIS COMMENT RECORD(s):. 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS BIT RUN 7. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(.. 1) Repcode(66) Logging direction is down (value= 255) _ Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) - Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 .7 8 91011 12 13 14 15 16 000 I 0 0 000 0 0 1 000 1 Rep Code Count Bytes 68 27 108 Sum: 27 108 108 fndun a [F ] 1.00000000 3 ONE DEPTH PER FRAME Tape depth ID: F 27 Curves: Name Code Samples Units Size Length 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ARCM 68 1 -dB 4 4 RHOB 68 1 G/C3 4 4 CAAM 68 I MMHO 4 4 CACM 68 1 MMHO 4 4 CPAM 68 1 MMHO 4 4 CPCM 68 1 MMHO 4 4 PEF 68 1 BN/E 4 4 DPLM 68 1 PU 4 4 DPSM 68 1 PU 4 4 DRHO 68 1 G/C3 4 4 GRAM 68 1 GAPI 4 4 GR 68 1 GAPI 4 4 GRCM 68 1 GAPI 4 4 NPAM 68 1 PU 4 4 NPLM 68 1 PU 4 4 NPHI 68 1 PU-S 4 4 NPSM 68 1 PU-S 4 4 PDCM 68 1 DEG 4 4 RAAM 68 1 OHMM 4 4 RA 68 1 OHMM 4 4 ROP 68 1 FI)HR 4 4 RPAM 68 1 OHMM 4 4 RP 68 I OHMM 4 4 RPDM 68 1 OHMM 4 4 RPTM 68 I MINS 4 4 TCDM 68 I DEG 4 4 WBCS 68 I KLBS 4 4 108 ** Routine'LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 9 FRAMES * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 153 Tape File Start Depth = 9520.000000 . Tape File End Depth = 9864.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code deCoding summary: Rep Code: 68 42602 datums Tape Subtile: 8 233 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subtile 9 is type: LIS **** FILE HEADER MWD .008 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate tiles. BIT RUN NO: 8 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 9864.0 10246.0 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME)' TD DRILLER (FT): TOP LOG INTERVAL (Er): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RI'M): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 23 SEP 91 M1.32 M1.32 MEMORY 0.0 9864.0 10246.0 0 63.8 70.5 TOOL NUMBER MWD $ NEUTRON/POROSITY 1677-02 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 9522.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): OILBASE 9.00 11.0 0.0 14000 0.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT-MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: 0.000 MUD CAKE AT MT: 0.000 0.000 0.000 0.0 0.0 0.0 0.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 2 REMARKS: INTERVAL FROM 9864 TO 9911 FEET MD (8521 TO 8541 FT TVD WAS LOGGED APPROXIMATELY 13 HOURS AFTER BEING DRILLED DUE TO A BIT TRIP. $ CN : PRUDHOE BAY DRILLING WN : DS5-30 FN PRUDHOE BAY COUN : NORTH SLOPE STAT :ALASKA LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS BIT RUN 8. * FORMAT RECORD OWPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction i$ down (value= 255) Entry Tyl~e(12) Size(4) Repo"ode(68) Null data value is: -999.2.~ Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type i$: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 12 13 14 15 16 0 0 0 -,~0 0 0 0.O 0 0 ~ 0 0 n 1 Rep Code Count Bytes 68 27 108 Sum: 27 108 108 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 27 Curves: Name Code Samples Units Size 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 Length ARCM 68 1 -dB 4 4 RHOB 68 1 G/C3 4 4 C~AM 68.' ! MMHO 4 4 CACM 68 1 MMHO 4 4 CPAM 68 1 MMHO 4 4 CPCM 68 1 MMHO 4 4 PEF 68 1 BN/E 4 4 DPLM 68 1 PU 4 4 DPSM 68 1 PU 4 4 DRHO 68 1 G/C3 4 4 GRAM 68 I GAPI 4 4 GR 68 1 GAPI 4 4 GRCM 68 1 GAPI 4 4 NPAM 68 1 PU 4 4 NPLM 68 1 PU 4 4 NPHI 68 I PU-S 4 4 NPSM 68 1 PU-S 4 4 PDCM 68 1 DEG 4 4 RAAM 68 I OHMM 4 4 RA 68 I OHMM 4 4 ROP 68 1 FPHR 4 4 RPAM 68 1 OHMM 4 4 RP 68 1 OHMM 4 4 RPDM 68 1 OHMM 4 4 RPTM 68 I MINS 4 4 TCDM 68 I DEG 4 4 WBCS 68 I KLBS 4 4 108 ** Routine'LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 9 FRAMES * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 170 Tape File Start Depth = 9864.000000 Tape File End Depth = 10246.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code deCoding summary: Rep Code: 68 36413 datums Tape Subtile: 9 239 records... Minimum record length' Maximum record length: 62 bytes 1014 bytes Tape Subtile 10 is t~p~: US **** FILE HEADER MWD .009 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 _. FILE HEADER FILE NUMBER: 9 RAW MWD _ Curves and log header data for eaCh bit run in seParate tiles. BIT RUN NO: 9 DEPTH INCREMENT: 0.2500 -- # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 10246.0 11192.0 $ · - # LOG HEADER DATA DATE LOGGED: - SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (Fl'): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 24 SEP 91 M1.32 M1.32 MEMORY 0.0 10246.0 11192.0 0 70.5 91.8 TOOL NUMBER MWD $ NEUTRON/POROSITY 1677q32 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 9522.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): OILBASE 9.00 45.0 0.0 14000 0.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT-MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: 0.000 MUD CAKE AT MT: 0.0O0 0.000 O.O(X~ 0.0 0.0 0.0 0.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 8.50O TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 2 REMARKS: INTERVAL FROM 10246 TO 10289 FEET MD (8669 TO 8682 FT TVD) WAS LOGGED APPROXIMATELY 13 HOURS AFTER BEING DRILLED. INCLINATION OF HOLE REACHED 90 DEGREES AT 11065 FEET MD (8799 FEET TVD). $ CN . PRUDHOE BAY DRILLING WN : DS5-30 FN . PRUDHOE BAY COUN NORTH SLOPE STAT :ALASKA LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS BIT RUN 9. * FORMAT' RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) ._ Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 .. Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 1213 14 15 16 000 1 0000000 1 000 1 Rep Code Count Bytes 68 27 108 Sum: 27 108 108 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 27 Curves: Name Code Samples Units Size Length I ARCM 68 1 -dB 4 4 2 RHOB 68 1 G/C3 4 4 3. CAAM 68 1... MMHO 4 4 4 CACM 68 1 MMHO 4 4 5 CPAM 68 1 MMHO 4 4 6 CPCM 68 1 MMHO 4 4 7 PEF 68 1 BN/E 4 4 8 DPLM 68 1 PU 4 4 9 DPSM 68 1 PU 4 4 10 DRHO 68 1 G/C3 4 4 11 GRAM 68 I GAPI 4 4 12 GR 68 1 GAPI 4 4 13 GRCM 68 1 GAPI 4 4 14 NPAM 68 1 PU 4 4 15 NPLM 68 1 PU 4 4 16 NPHI 68 1 PU-S 4 4 17 NPSM 68 1 PU-S 4 4 18 PDCM 68 1 DEG 4 4 19 RAAM 68 1 OHMM 4 4 20 RA 68 1 OHMM 4 4 21 ROP 68 1 FPHR 4 4 22 RPAM 68 1 OHMM 4 4 23 RP 68 1 OHMM 4 4 24 RPDM 68 1 OHMM 4 4 25 RPTM 68 I MINS 4 4 26 TCDM 68 I DEG 4 4 27 WBCS 68 I KLBS 4 4 108 ** Routine'LEVONE detects data discrepancy: DSB indicates: I FRAMES Data Record Length indicates: 9 FRAMES * DATA RECORD (TYPE# Total Data Records: 421 0) 1014 BYTES * Tap. File~tart D~.nth = 10246.000000 · Tape File End Depth = 11192.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LiS representation code decoding summary: Rep Code: 68 58700 datums Tape Subtile: 10 493 records... Minimum record length: Maximum record length' 62 bytes 1014 bytes Tape Subfile 11 is type: US **** FILE HEADER **** MWD .010 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 0 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 11192.0 11963.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BO'I'TOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 26 SEP 91 M1.32 M1.32 MEMORY 0.0 11192.0 11963.0 0 88.8 93.3 TOOL NUMBER MWD $ NEUTRON/POROSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 1677-02 8,500 9522,0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: ,.. MUD CHLORIDES (PPM): FLUID LOSS (C3): OILBASE 9.20 47.0 12000 0.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT .MEASURED TEMPERATURE (MT)' MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: 0,000 MUD CAKE AT MT: 0,000 0,000 0.000 0,0 0.0 0.0 0.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2,65 8,500 TOOL STANDOFF (IN)' EWR FREQUENCY (HZ): 0.0 2 -REMARKS: INTERVAL FROM 11192 TO 11228 FEET MD WAS LOGGED APPROX- IMATELY 13,5 HOURS AFTER BEING DRILLED, INTERVAL FROM 11964 FEET MD TO TD WAS NOT LOGGED DUE TO BIT TO SENSOR OFFSETS, $ CN PRUDHOE BAY DRILLING WN ' DS5-30 FN : PRUDHOE BAY COUN ' NORTH SLOPE STAT 'ALASKA LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS BIT RUN 10, * FORMAT RECORD (T'YPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 12 13 14 15 16 O0 0 I 000 000 0 1 O0 0 1 Rep Code Count Bytes 68 27 108 Sum: 27 108 108 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 27 Curves: Name Code Samples Units Size Length 108 1 ARCM 68 1 -dB 4 4 2 RHOB 68 1 G/C3 4 4 3 CAAM 68 1 MMHO 4 4 .... ..~. 4 CACM 68 1 MMHO 4 4 5 CPAM 68 1 MMHO 4 4 6 CPCM 68 1 MMHO 4 4 7 PEF 68 1 BN/E 4 4 8 DPLM 68 1 PU 4 4 9 DPSM 68 1 PU 4 4 10 DRHO 68 I G/C3 4 4 11 GRAM 68 I GAPI 4 4 12 GR 68 1 GAPI 4 4 13 GRCM 68 1 GAPI 4 4 14 NPAM 68 I PU 4 4 15 NPLM 68 1 PU 4 4 16 NPHI 68 1 PU-S 4 4 17 NPSM 68 1 PU-S 4 4 18 PDCM 68 1 DEG 4 4 19 RAAM 68 1 OHMM 4 4 20 RA 68 1 OHMM 4 4 21 ROP 68 1 FPHR 4 4 22 RPAM 68 1 OHMM 4 4 23 RP 68 1 OHMM 4 4 24 RPDM 68 1 OHMM 4 4 25 RPTM 68 I MINS 4 4 26 TCDM 68 I DEG 4 4 27 WBCS 68 I KLBS 4 4 ** Routine'LEVONE detects data discrepancy: DSB indicates: I FRAMES Data Record Length indicates: 9 FRAMES * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 343 Ta[~e File Start Depth = !1192.000000 Tape File End Depth = 11963.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 49543 datums Tape Subtile: 11 Minimum record length: Maximum record length: 414 records... 62 bytes 1014 bytes Tape Subtile 12 is type: LIS **** FILE HEADER MAD .011 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 11 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 1 1 0.25O0 MAD PASS NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE START DEPTH MAD 10227.0 10572.0 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (F'I'): TOP LOG INTERVAL (F'r): BOTTOM LOG INTERVAL (F'r): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING CI'OP TO BOTTOM) STOP DEPTH 28 SEP 91 M1.32 M1.32 MEMORY 0.0 1O227.0 1O572.0 0 0.0 0.0 VENDOR TOOL CODE TOOL TYPE MWD NEUTRON/POROSITY $ TOOL NUMBER 1677-02 BOREHOLE AND CASING.DATA OPEN HOLE BIT SIZE (IN)' DRILLER'S CASING DEPTH (FT)' 8.500 9522.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): OILBASE 0.OO 0.0 0.0 0 0.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: 0.OOO MUD CAKE AT MT: 0.0OO 0.000 0.OOO 0.0 0.0 0.0 0.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 8.5OO TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 2 REMARKS' MAD PASS WAS MADE ON TELECO RUN 9 (BHA RUN 10) FROM 10247 TO 10573 FEET MD (8669 TO 8751 FT TVD) 61 HOURS AFTER DRILLED. $ CN · PRUDHOE BAY DRILLING WN ' DS5-30 FN ' PRUDHOE BAY COUN : NORTH SLOPE STAT 'ALASKA LIS COMMENT RECORD(s)' 12345678901234567890123456789012345678901234567890123456789012345678901234567890 DATA FOR THIS FILE CONTAINS MAD PASS 1. * FORMAT RECORD (TYPE~ 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.25'0000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. -, Summary of entry types encountered: -. 1 2 3 4 5 6 7 8 91011 12 13 14 15 16 -- 000 1 0000000 1 000 1 Rep Code Count Bytes 68 27 108 Sum: 27 108 108 -- fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID' F 27 Curves: Name Code Samples Units Size Length 1 ARCM 68 2 RHOB 68 3 CAA. M R~ 4 CACM 68 5 CPAM 68 6 CPCM 68 7 PEF 68 8 DPLM 68 9 DPSM 68 10 DRHO 68 11 GRAM 68 12 GR 68 13 GRCM 68 14 NPAM 68 15 NPLM 68 16 NPHI 68 17 NPSM 68 18 PDCM 68 19 RAAM 68 20 RA 68 21 ROP 68 22 RPAM 68 23 RP 68 24. TCDM 68 25 WBCS 68 26 TCDA 68 27 WBCM 68 1 -dB 4 4 1 G/C3 4 4 1 MMHO 4 4 1 MMHO 4 4 1 MMHO 4 4 1 BN/E 4 4 1 PU 4 4 1 PU 4 4 1 G/C3 4 4 I GAPI 4 4 I GAPI 4 4 1 GAPI 4 4 1 PU 4 4 1 PU 4 4 1 PU-S 4 4 1 PU-S 4 4 1 DEG 4 4 1 OHMM 4 4 1 OHMM 4 4 1 FPHR 4 4 I OHMM 4 4 1 OHMM 4 4 1 DEG 4 4 I KLBS 4 4 1 4 4 1 4 4 108 ** Routine'LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 9 FRAMES * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 154 ~--~-~:~ T~,,~ ~i~,~ Star~.Depth = 10227.000000 - ~ _~':7'.. . -*~'~"~r'~'~ *, "'~ '" Tape File End Depth = 10572.000000 -- Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet -- **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 64618 datums Tape Subtile: 12 224 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 13 is typ~: US **** TAPE TRAILER **** MWD 91/10/29 847 01 **** REEL TRAILER **** MWD 91/11/21 847 01 Tape Subtile: 13 2 records... Minimum record length: Maximum record length: 132 bytes 132 bytes End of execution: Thu 21 NOV 91 8:37a Elapsed execution time = 2 minutes, 44.6 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH RHOB NPHI RA NCNT FET e 7630.0000 -999.2500 -999.2500 2.3367 -999.2500 0.0000 PEF DRHO GR ROP RP FCNT WOBS -999.2500 -999.2500 124.8769 -999.2500 2.1282 -999.2500 -999.2500 7630.2500 -999.2500 -999.2500 -999.2500 2.3952 -999.2500 -99~..,_,.,,,,~°~nn 0.0000 --~,,~,,.255~3 -999.2500 119.9570 2.2203 -999.2500 7650.0000 -999.2500 -999.2500 -999.2500 2.8439 -999.2500 -999.2500 1.1138 -999.2500 -999. 2500 148.6718 2.5459 -999.2500 7675.0000 -999.2500 -999.2500 -999.2500 1.5885 -999.2500 -999.2500 23.0000 -999.2500 -999.2500 123.2353 1.51 20 -999.2500 7700.0000 -999.2500 -999.2500 -999.2500 1.8494 88.6828 -999.2500 42.0000 16.2687 -999.2500 136.6253 2.2308 -999.2500 7725.0000 -999.2500 -999.2500 -999.2500 2.8065 102.5405 -999.2500 40.0000 15.5552 -999.2500 99.3625 2.8459 -999.2500 7750.0000 -999.2500 -999.2500 -999.2500 3.3543 124.6345 -999.2500 34.00(X) 15.8426 -999.2500 99.9166 3,4488 -999.2500 7775.(X)(X) -999.2500 -999.2500 -999.2500 2.7733 97.7632 -999.2500 38.0(XX) 13.2849 -999.2500 93.4913 2.6451 -999.2500 7800.0(X30 -999.2500 -999.2500 -999.2500 3.1568 75.4009 -999.2500 44.0000 11.3753 -999.2500 91.8724 2.9246 -999.2500 7825.0000 -999.2500 -999.2500 -999.2500 3.2589 75.1159 -999.2500 46.0000 12.7629 -999.2500 96.6563 3.2691 -999.2500 7850.0000 -999.2500 -999.25(X) 7875.0000 -999.2500 -999.2500 7900.0000 -999.2500 -999.2500 7925.0000 ',-999. 2500 -999.2500 7950.0000 -999.2500 -999.2500 7975.0000 -999.2500 -999.2500 8000.0000 -999.2500 -999.2500 8025.0000 -999.2500 -999.2500 8050.0000 -999.2500 · -999.2500 8075.0(X30 -999.2500 -999.2500 8100.0000 -999.2500 -999.2500 8125.0000 -999.2500 -999.2500 3.0290 45.0(XX) -999.2500 3.0677 37.0000 -999.2500 2.3706 36.3250 -999.2500 2.9015 45.0000 -999.2500 5.8805 49.1387 -999.2500 2.2534 122.4683 -999.2500 2.7126 117.0000 -999.2500 2.2604 50.0000 -999.2500 3.3180 56.00~ -999.2500 2.5028 45.0000 -999.2500 2.7515 38.1203 -999.2500 2.0797 -999.2500 108.4484 14.3712 -999.2500 98.5159 16.1773 -999.2500 103.2647 14.6046 -999.2500 84.81~'~ 12.2325 -999.2500 87.7041 15.2626 -999.2500 53.6023 13.9113 -999.2500 93.9981 11.8259 -999.2500 84.4683 5.7054 -999.2500 72.9385 10.5448 -999.2500 83.3300 12.7092 -999.2500 83.9934 14.2810 -999,2500 85.8180 -999.2500 3.0186 -999.2500 3.6277 -999.2500 2.2297 -999.2500 2 . - -999.2500 10.5657 -999.2500 2.1325 -999.2500 2.5821 -999.2500 2.5014 -999.2500 3.2991 -999.2500 2.3945 -999.2500 2.6680 -999.2500 2.0468 88.6619 -999.25(X) 89.8425 -999.2500 82.0681 -999.2500 101.9490 -999.2500 66.5571 -999.2500 99.1962 -999.2500 109.9163 -999.2500 86.6888 -999.2500 85.7506 -999.2500 98.0125 -999.2500 108.6695 -999.2500 98.3003 -999.2500 -999,2500 59,0078 12,4387 8150,0(XX:1 -999,2500 -999,2500 -999,2500 2,3065 103,2723 -999.2500 68,0000 12.8870 -999,2500 2;3928 93,7685 -999,2500 8175.0000 -999.2500 -999,2500 -999.2500 2,5728 90.9612 -999,2500 50,O(XX) 14,4749 -999,2500 2,6096 92.6428 -999,2500 8200.0000 -999,2500 -999,2500 -999.2500 2,1565 98,2398 -999,2500 57,8777 13,9836 8225,0000 -999,2500 -999,2500 -999.2500 2,2698 45.5223 -999.2500 45,00~ 7.6091 -999,2500 2,2315 · . -999.2500 2,3098 82,6576 -999,2500 76,6632 -999,2500 8250.0000 -999,2500 -999,2500 -999.2500 2,0683 77.0990 -999,2500 39,0000 8,0350 -999.2500 2,0061 94,4999 -999,2500 8275,0000 -999,2500 -999,2500 -999,2500 2,2688 94,8883 -999.2500 44,0000 10,5156 -999.2500 2,4045 94,9662 -999,2500 8300.0000 -999.2500 -999.2500 -999, 2500 2.3399 83,6084 -999.2500 38,3320. 9,4952 -999,2500 2,4487 101.3544 -999,2500 8325.0000 -999,2500 -999,2500 -999,2500 2.3442 133,8031 -999.2500 34,2819 8,2685 -999,2500 2,3256 96,2345 -999,2500 8350.0000 -999,2500 -999,2500 -999,2500 2,3729 111,0348 -999.2500 31,0(X~ 10,0381 -999.2500 2,4017 103,8304 -999,2500 8375,0000 -999,2500 -999,2500 -999,2500 2,4299 111,6756 -999.2500 35,4279 11,8561 -999,2500 2,3624 99.2169 -999,2500 8400.0000 -999,2500 -999,2500 -999,2500 3,1031 98,7814 -999.2500 43.0000 12.8605 -999,2500 3,0925 97,4214 -999,2500 8425.0000 -999.2500 -999.2500 -999.25(X) 2.5618 68.8705 -999.25(X:I 45.(:XX)O 12.7537 8450,(:XX)0. -999,2500 -999,2500 -999.2500 2.2446 88.1384 -999.2500 ' 38.000 11.4393 8475.0000 -999.2500 -999.2500 -999.2500 2.2088 93.9141 -999.2500 52.0(X30 3.4383 8500.0000 -999.2500 -999.2500 -@99.250,9- ..... 2.3062 .....94.91.48, -999.2500 69.0000 16.3313 8525.0000 -999.2500 -999.2500 -999.2500 2.5608 60.7098 -999.2500 93.0000 18.5275 8550.0(X)0 -999.2500 -999.2500 -999.2500 2.5365 95.2160 -999.2500 76.(:X)00 17.9231 8575.0000 -999.2500 -999.2500 -999.2500 2.9064 118.5771 -999.2500 28.0000 18.5427 8600.0000 -999.2500 -999.2500 -999.2500 2.5995 174.0100 -999.2500 30.0000 21.1571 8625.0000 -999.2500 -999.2500 -999.2500 1.9360 137.6452 -999.2500 29.6822 22.6235 8650.0(XX) -999.2500 -999.2500 -999.25(X) 2.0948 129.6657 -999.25(X) 33.9356 17.4114 8675.0000 -999.2500 -999.2500 -999.2500 2.0388 110.2235 -999.2500 36.1473 20.7654 -999.2500 2.6485 -999,2500 2.3052 -999,2500 2.6435 -999,2500 2.32.,39 -999.2500 2.7669 -999.2500 2.5939 -999,2500 2.9435 -999.2500 2.6236 -999.2500 2.1223 -999,25(X) 2.1201 -999.2500 1.9131 78,9658 -999.2500 102.3319 -999.2500 95.0237 -999.2500 113.6078 -999.25CC 147.7600 -999.25O0 220.0422 -999.2500 211.2290 -999.2500 215.5789 -999.25O0 205.3542 -999.25(:X) 186.6708 -999.2500 197.3958 -999.2500 8700.0000 -999.2500 -999.2500 -999.2500 186.7310 -999.2500 2.4491 153.4163 2.5843 -999.2500 -999.2500 37.0(XX3 20.7989 8725.0(X~ -999.2500 -999.2500 8750.0000 -999.2500 -999.2500 8775.~300 -999.2500 -999.2500 8800.0000 -999.2500 -999.2500 8825.0000 -999~2500 -999.2500 8850.0(X30 -999.2500 -999.2500 8875.0000 -999.2500 -999.2500 8900.0000 -999.2500 -999.2500 8925.0000 -999.2500 -999.2500 8950.0000 -999.25(X) -999.2500 8975.0000 -999.2500 -999.2500 -999.2500 3.5747 32.0000 -999.2500 4.5084 545.0000 -999.2500 3.9661 575.8281 -999.2500 7.2949 87.7885 -999.2500 3.1597 68.6485 -999.2500 3.9103 48.0000 -999.2500 4.4945 45.0898 -999.2500 4.5241 1270.(XXX) -999.2500 8.6099 1310.0000 -999.2500 5.5487 164.8033 -999.2500 4.9890 153.7656 -999.2500 68.8594 13.7380 -999.2500 129.6751 14.9291 -999.2500 92.8590 17.0336 -999.2500 64.7626 13.9761 -999.2500 71.1988 14.9994 -999.2500 62.2767 3.0526 -999.2500 85.6146 17.3995 -999.2500 74.7285 16.0553 -999.2500 78.1843 15.0687 -999.2500 46.6607 56.4694 -999.2500 27.9691 66.8939 -999.2500 3.7070 -999.2500 4.2261 -999.2500 3.8554 -999.2500 6.0575 -999.2500 3.5302 4.1133 -999.2500 4.0922 -999.2500 4.6224 -999.2500 10.2830 -999.2500 5.3845 -999,2500 4,6O29 188.3921 -999.2500 154.6573 -999.2500 147.3010 -999.2500 168.8960 -999.2500 116.6427 -999.2500 135.0135 -999.2500 155.8025 -999.2500 122.4968 -999.2500 110.7867 -999.2500 114.2211 -999.2500 147.3842 -999.2500 -999.2500 -999.2500 9050.0000 -999.2500 -999.2500 9075.0000 -999.2~ -999.2500 9100.0000 -999.2500 -999.2500 9125.0000 -999.2500 -999.2500 9150.0OOO -999.2500 -999.2500 9175.0000 -999.2500 -999.2500 9200.0000 -999.2500 -999.2500 9225.0000 -999.2500 -999.2500 9250.0000 -999.2500 -999.25O0 9275.0000 -999.2500 -999.2500 5.7361 133.0000 -999.2500 5.4358 '113.3176 -999.2500 5.6619 94.6184 -999.2500 6.!50! 97.6875 -999.2500 6.2202 86.0352 -999.2500 8.7843 683.0000 -999.2500 10.0190 678.7810 -999.2500 · 4.6347 83.0000 -999.2,500 7.5535 100.9310 -999.2500 6.1426 97.0000 -999.2500 4.0749 110.0000 -999.2500 4.7173 -999.25O0 36.4830 62.7182 -999.2500 32.9654 46.7390 -999.2500 40.9983 55.6741 -999.2500 57.1521 -999.2500 56.8722 68.0188 -999.2500 51.5029 60.4477 -999.2500 63.4313 57,6255 -999.2500 58.0442 39.6855 -999.2500 81.3585 53.7743 -999.25O0 59.4361 52.7347 -999.2500 56.5907 52.3188 -999.2500 65.2960 -999.2500 4.9955 -999.2500 5.5500 -999.2500 5.7914 -999.2500 7.5723,~~ -999.2500 6.2977 -999.2500 8.6821 -999.2500 10.9417 -999.2500 5.4220 -999.2500 11.4,3,34 -999.250O 6.1182 -999.2500 4.8209 -999.2500 5.9580 192.7068 -999.250O 202.2790 -999.2500 222.9553 -999,2500 206.2595 -999.25~ 220.1678 -999.2500 291.8900 -999.2500 167.1938 -999.2500 162.8051 -999.2500 272.5894 -999.2500 202.7199 -999.2500 246.9868 -999.2500 229.8066 -999.2500 -999.2500 102.2891 53.0706 9300.00(~ -999.2500 -999.2500 -999.2500 4.7947 44.1596 -999.2500 111 .(:XX)O 54.04,33 -999.2500 5.4817 150.0830 -999.2500 9325.0000 -999.2500 -999.2500 -999. 2500 2.1536 65.2195 -999.2500 95.4609 53.5262 132.1830 -999.2500 9350.0000 -999.2500 -999.2500 -999. 2500 2.5069 61.1725 -999.2500 87.0820 51.4993 -999.250O 3.4428 135.9378 -999.2500 9375.00(Z) -999.2500 -999.2500 -999.2500 3.5189 41.8986 -999.2500 77.0000 55.6459 -999.25O0 3.9217 129.7930 -999.2500 9400.0000 -999.2500 -999.2500 -999.2500 141.2780 109.7400 -999.2500 90.5859 37.1400 -999.2500 125.6,339 168.0358 -999.2500 9425.0000 -999.2500 -999.2500 -999.2500 141.2780 76.8778 -999.2500 114.3633 42.7343 -999.2500 95.6604 '73.3750 -999.2500 9450.0000 -999.2500 -999.2500 -999.2500 -999.2500 100.6991 -999.2500 -999.2500 43.7158 -999.2500 -999.2500 9475.0000 -999.2500 -999.2500 34. 7262 0.0699 19.1797 5346.0840 3005.6211 43.8795 -999.2500 5.4855 37.9560 16.9511 9500.0000 -999.2500 -999.2500 39.2174 0.0860 78.8049 5204.4932 3229.7710 38.9885 -999.2500 261.0072 221.5968 14.7430 9525.0(XX:I -8.0230 -0.24(X) 18.9718 341.1255 83.0623 5395.4121 283.0000 9.4726 -12.8564 48.0231 84.1899 30.6005 9550.0000 2.4205 3.1268 23.0770 26.6640 57.8066 5887.2666 42.0(X~ 61.9669 0.0368 25.08,9O 138.2689 26.9659 9575.0000 10.6875 6215.9961 9600.0O00 10.9831 6251.4893 9625.0000 11.0012 6234.5781 9650.0000 11.2486 6272.9443 9675.0000 12.1449 6170.2363 9700.0000 11.8650 6281.5488 9725.0000 11.2152 6205.1611 9750.0000 12.2217 6253.6055 9775.0000 12.5527 6253.6807 9800.0000 11.9987 6392.0605 9825.0000 12.1481 6375.0283 9850.0000 9.1100 2.1010 -228.3819 49.2031 1.9618 .-999.2500 48.0000 2.0648 -999.2500 36.9727 2.0422 -999.2500 39.00(X) 2.2010 -999.2500 58.4336 2.2915 -999,2500 63.0(X~ 2.0312 -999.2500 59.2388 2.1550 . -999.2500 64.0000 2.1550 -999.2500 65.6577 2.1202 -9cJg.25(X) 71.7102 2.1054 -999.2500 79.0000 2.5260 -999.2500 -0.2400 82.5986 67.1945 1.2731 107.7673 64.0317 2.0656 124.2720 49.0591 3.2624 120.8767' 50.4595 -0.2400 68.1359 49.0545 4.4598 109.8624 52.0868 1.8360 95.2406 51.4898 -0.2400 80.9449 40.3361 -0.2400 78.3024 35.0043 2.7419 66.9291 37.3186 2.2193 78.1312 39.6377 2.8165 49.9985 -0.1393 -999.2500 -0.0730 -999.2500 -0.0473 -999.2500 -0.0708 -999.2500 -0.0950 -999.2500 0.0269 -999.2500 -0.0528 9435.9883 -0.1026 -999.2500 -0.1026 -999.2500 -0.0263 -999.2500 -0.0065 -999.2500 0.0298 995.7313 28.8405 59.6685 24.7308 58.3997 23.3582 58.2014 20.8952 57.2556 41.5318 52.3017 24.8810 54.7702 23.8547 56.8053 26.4391 52.6899 15.0650 51.3552 20.8171 54.8334 19.5508 54.0426 30.0428 72.7912 6468.4346 75.CXXX) 39.1533 9875.0(X~ 2.4453 3.6582 10.5158' -999.2500 53.0557 6541.9,50~ 824.00(X) 36.8474 . 9900.00(~ ' 2.3980 1.5956 7.1197 -999.2500 41.7066 6531.3076 828.2539 35.6538 -0.0316 -999.2500 -0.0295 -999.25CX) 20.5154 64.1602 13.7188 94.0887 9925.00(X) 2.3768 2.3401 12.0502 -999.2500 45.5648 6395.8262 100.3857 46.6295 0.0747 -999.2500 16.6.398 54.9110 9950.0000 2.1959 2.1074 8.9607 -999.2500 30.9823 6343.8584 114.9282 63.9197 -0.0223 -999.2500 10.9630 72.6400 9975.0000 2.1068 2.6910 11.9665 -999.2500 86.4372 6248.7266 71.2070 , 80.7973 0.0223 -999.2500 18.7961 53.9907 10000.0000 2.1119 2.6460 15.1108 -999.2500 162.7891 6194.0156 33.0234 32.0575 0.0310 -999.2500' 22.7009 42.7798 10025.0000 2.0868 2.4946 11.2911 -999.2500 109.1156 6324.2793 40.0059 61.8581 0.0103 -999.2500 21.1027 57.8487 10050.0000 2.0573 2.5466 10.8178 -999.2500 111.9242 6189.7139 40.6726 64.7835 0.0343 -999.2500 17.5356 58.9887 10075.0000 2.0641 2.7066 11.7521 -999.25(X) 108.7534 6243.3896 31.1294 65.0932 13.6651 54.9351 10100.O(XX:I 2.0500 2.5788 13.2341 -999.2500 129.6843 6207.8008 39.8957 37.9067 -0.0114 -999.2500 15.5273 48.7579 10125.0000 2.1691 3.0618 14.1766 -999.2500 137.9904 6269.6221 93.0000 34.9628 0.0649 -999.2500 18.5392 45.9611 10150.0000 19.3241 6206.9619 10175.(XXX)' 13.7679 6278.1279 10200.0000 18.5292 6218.7666 10225.0000 17.0493 6449.6230 10250.0000 '14.4857 6175.0449 10275.0000 16.7657 6062.9687 10300.0000 16.1275 6191.3633 10325.0000 15.5395 6396.4883 10350.0000 14.4328 6237.1084 10375.0300 15.0332 6192.7383 10400.0000 17.3162 6149.8066 10425.0000 19.4092 2.5664 15.4975 116.00(X) 2.6177 26.3943 100.1182 2.5699 8.2257 66.0000 2.6287 208.8310 26.0000 2.0440 497.5964 762.0000 2.0020 -999.2500 779.0953 2.0391 -999.2500 38.0000 2.4359 -999.2500 37.0074 2.1174 -999.2500 38.0000 2.1031 -999.2500 33.0000 2.1674 -999.2500 31.0000 2.2113 -999.2500 3,9164 29.0889 36.3112 3.8307 32.7262 30.0571 3.6061 29.3877 37.1168 4.4743 31.60S7 ' 37.1897 3.2705 164.0381 24.5056 1.9399 105.4541 32.2645 1.7015 98.4660 28.6807 3.3022 71.7502 50.3225 1.8127 103.7231 49.3,3,36 2.7535 115.9120 52.2086 3.3461 100.4306 49.9205 2.6237 344.8753 0.0751 9.1479 0.0817 39.0282 -0.0275 7.0383 0.0101 ' "27.4199 0.0255 -999.2500 0.0081 -999.2500 0.0195 -999.2500 O. 1057 1663.2307 0.0249 -999.2500 0.0056 1086.9~ 0.0034 -999.2500 0.0545 -999.2500 58.5325 47.4118 68.5832 35.2281 103.6548 39.6021 11.5278 44.3450 20.4936 37.8053 27.9O97 40.1127 50.6189 42.9429 14.4278 44.9543 27.7676 42.9227 35.7986 37.1888 24.1549 33.6120 62O3.O43O 34.8298 36.6889 10450.(XX~ 2.1107 2.3739 17.9122 -999.2500 104.1260 6192.1455 31.0(X:)0 47.5118 13.3536 36.5587 10475.(ZXX) ' 2.1130 1.5968 20.1827 -999.2500 108.8071 6223.4199 27.0(X)0 52.9968 0.0602 -999.2500 17.7909 32.4944 10500.00(~ 2.1563 2.5036 20.9016 -999.2500 101.4435 6198.8896 28.~ 51.1121 0.0657 -999.2500 16.0258 31,3044 10525.0000 2.2185 3.1110 22.2778 -999.2500 123.2112 6229.6934 36.8220 51.6386 0.1066 -999.2500 20.9239 29,6759 10550,0000 2.2772 1.9453 18.3670 -999.25(X) 83.6986 6251.4082 61.0000 52.0279 0.0808 543.5870 27.4465 35.7103 10575.0000 2.5196 2.0497 15.2393 -999.2500 32.4446 6357.0732 40.1797 50.1793 0.0541 189.3776 78.1409 43.5047 10600.0000 2.3471 4.1611 18.5627 -999.2500 86.0879 6370.7715 37.6836 ' 49.3652 -0.0272 620.4773 23.2984 36.0232 10625.0000 2.46,33 3.6430 16.4896 -999.2500 87.0282 6469.9668 43.00(X) 49.8996 0.08&9 491.9168 39.5910 41.0263 10650.0000 2.5483 5.2929 17.5915 -999,2500 56.8367 6530.7354 35.1990 47.8719 -0.0277 8811.8848 16.5536 38.8911 10675.0000 2.3485 3.2701 21.7303 -999.2500 48.0067 6186.5937 28.6319 46.0577 -0.0280 747.5615 74.7585 30.1170 10700.0000 2.2675 2.9863 21.4160 -999.2500 109.5594 6217.6406 31.0000 48.6903 0.1190 8627.2656 19.3497 30.7892 10725.0000 20.0291 6299.3,340 10750.0(X)0 20.4659 6255.8965 1O775.0000 20.6047 6206.136 7 10800.0000 ...... 20.8856 6170.4961 10825.0000 20.4525 6210.0010 10850.0000 18.9010 6167.6807 10875.00(30 18.4259 6413.1475 10900.0000 20.6597 6220.8447 10925.0000 19.8180 6308.9414 10950.0000 20.0350 ' 6265.4014 10975.0000 18.2753 6436.8330 11000.0000 17.8324 2.1299 -999.2500 37.0000 2.1559 -999.2500 33.2812 2.1600 -999.2500 32.00(X) 2.1423 - .c~..,~,.~./~ · 31.0000 2.1026 -999.2500 34.0000 2.1414 -999.2500 31.9748 2.1775 -999.2500 35.0000 2.1333. -999.2500 42.2067 2.1748 -999.2500 44.0000 2.2979 -999.2500 37.7656 2.3458 -999.2500 33.0000 2.2485 -999.2500 1.0873 114.2982 45.4328 1.7368 101.6688 40.8900 2.0635 147.9528 24.4646 2.2153 124.8~ 44.6329 1.1953 104.6769 47.0967 0.9393 91.8587 50.6770 2.8038 166.3836 44.9442 1.6792 119.0946 44.5951 2.5148 103.0820 41.5493 2.3060 67.9212 45.7120 4.3137 103.2810 45.1325 2.9919 114.1788 0.0586 -999.2500 0.0005 -999.2500 0.0362 -999.2500 0.0384 -999.2500 -0.0637 -999,2500 0.0653 -999.2500 0.0095 -999.2500 0.0024 -999.25(X) 0.0358 -999.2500 25.4506 33..1246 23.4816 32.2659 65.6158 31.7641 30.0054 31.17SI 34.9822 32.0093 21.6142 34.2756 23.7078 36.5362 26.3,966 31.8669 35.6022 33.6231 54.7819 32.9350 30.3019 37.0151 47.1186 37.4742 6369.7686 45.5078 46.5993 11025.0000 19.9166 6167.7002 11050.0000 20.3040 6225.1367 11075.0000 18.5941 6249.6729 11100.0000 20.2438 6269.7979 11125,0000 19.6030 6262.1797 11150.0000 18.7721 6244.7695 11175.0000 20.4922 6200.8232 11200.0000 21.5771 6204.5605 11225.0000 22.6321 6258.46(X) 11250.0(X~ 20.2187 6204.3418 11275.0000 21.2242 6229.0654 2.2143 -999,2500 34.5577 2.2218 -999.25(X) 26.7963 2.1958 -999.25O0 26.0(X30 2.2074 -999.2500 30.8296 2.1824 -999.2500 38.3047 2.1956 -999.2500 26.8409 2.1498 -999.2500 34.6836.. 2.2430 -999.2500 865.4286 2.3320 -999.25(X) 122.3125 2.2860 -999.2500 82.3340 2.5086 -999.2500 70.3359 2.2165 109.4138 44.7377 2.1638 65.0060 42.7503 1.9963 131.5050 47.7062 1.7033 127.3125 50.6582 1.3723 96.1677 49.3061 1.3160 128.4158 47.8578 1.5920 138.5003 44.3621 2.0023 119.1331 45.3517 3.9905 113.4396 35.9172 2.0306 44.2307 69.3434 2.7O59 21.5517 32.6994 0.0035 0.0285 -999.2500 0.0716 -999.2500 · , 0.0769 -999.2500 0.0628 -999.2500 0.0615 -999.2500 0,0506 -999.25(:X) 0.0994 435.4626 0.0295 512.9828 0.0556 484.3107 0.0934 62.1251 74.7528 32.6404 60.6108 32.3180 32.2542 35.3159 26.8974 32.6,339 26.7465 33.6323 32.2774 34.9377 32.7853 32.0130 35.8320 30.4549 41.3852 29.4162 53.5170 32.3321 94.5351 31.0155 11300.0000 20.50(~ 6239.114,3 11325.OO00 20.9353 6269.8711 11350.0000 20.8694 6297.1240 11375.0000 ...... 19.7955' 6142.5771 11400.OOO0 17.6538 6445.1191 11425.0000 12.7872 6667.2080 11450.0000 15.2042 6332.9785 11475.0000 16.6388 6457.3770 11500.0000 17.4079 628O.5O98 11525.0000 15.7328 6367.1055 11550.00(X) 17.0018 6315.4795 11575.0000 16.8677 2.3168 -999.2500 47.8777 2.3225 -999.25oo 65.9893 2.4081 -999.25OO 124.3223 2.6307 -999.2500 151.3594 2.6104 -999.2500 97.0(XX) 2.5612 971.1548 101.3145 2.5349 25.7405 129.4720 2.5308 55.1307 135.1275 2.6,389 379.4125 103.7952 2.4244 -999.2500 63.1209 2.3072 -999.2500 49.00(X) 2.36O2 -999.2500 2.2383 48.3738 39.9716 3.5829 57.7900 39.9562 3.0875 60.2030 49.1151 4.6423 17:0528 45.3478 5.6960 15.7704 48.2560 4.4330 22.1087 47.4240 2.6546 27.0521 47.6355 3.4307 21.9207 46.6940 3.1904 15.1714 46.9588 2.4468 21.0750 47.7031 1.8575 56.2498 46.6745 2.0254 53.1057 0.0506 275.6359 0.0136 355.5760 0.1102 173.3299 0.0771 19.670 i -0.0803 201.5772 -0.0894 49.7652 0.0711 14.6203 -0.0413 22.9068 0.0864 33.3507 -0.0105 117.6918 0.0267 103.4599 0.0654 79.1915 48.3875 32.1327 63.3131 31.6555 55.1734 31.8776 110.9882 32.7i30 85.4024 38.3490 75.8262 54.0595 108.4248 43.4878 117.9866 40.5743 121.6790 37.8216 98.4183 42.2266 68.2329 38.9401 100.9552 39.1249 6287.7441 69.3906 48.4072 11600.0000 15.1782 6438.6387 11625.0(X~ 16.0749 6574.5605 11650.0000 14.3424 6675.2588 11675.0000 21.4000 6305.9521 11700.0000 18.8714 6298.5293 11725.00(~ 20.4714 6290.5918 11750.0000 20.3330 6272.9453 11775.0000 18.6386 6308.9561 11800.0(X~ 23.7162 6108.9375 11825.0(X30 16.4776 6486.8457 11850.0000 19.2026 6329.1074 2.5145 -999.2500 82.3929 2.4662 -999.25(X) 64.0000 2.6972 -999.2500 48.9219 2.2169 -999.2500 68.0(XX3 2.2526 -999.2500 59.1961 2.3466 -999,25(X) 42.6106 2.2282 -999.25OO 48.9887 2.1992 -999.2500 119.7843 2.5514 -999.2500 98.9141 2.1338 -999.2500 41.0000 2.1983 -999.2500 44.6435 2.9996 51.3181 48.8821 5,3178 27.5854 48.6075 6.3575 29.7604 49.6809 2.7764 67.0853 49.6765 2.0626 43.3629 51.4704 2.2792 49.9764 56.7522 1.8312 65.1036 55.6568 1.3662 78.6597 54.0129 4.9497 13.3944 55.0980 2.4060 73.1698 53.1450 1.3641 55.1305 54.5142 0.0500 115.3990 -0.1083 232.0507 -0.0967 289.1166 0.0464 544.8453 0.0195 554.1855 0,0893 1386.4753 0.1081 219.3391 0.0627 153.0790 0.0189 30.2818 -0.1568 137.0745 0.0451 192.0587 106.0095 44.2055 42.1256 42.6927 22.7995 48.4061 32.0191 31,1384 56.9177 35.0632 71.03(X) 32.4035 38.6273 32.5279 43.4930 35.5651 138.8305 27.3781 44.3325 41.2190 47.5080 34.6895 11875.0(X)0 2.2735 1.0103 0.0467 17.6726 -999.2500 63.0715 242.3950 6287.5166 49.2245 53.3351 11900.0000 2.3731 1.7343 O. 1052 18.1753 -999.2500 49.2204 304.1484 6255.3789 '57.0000 55.4640 11925.0000 2.3295 1.6093 0.0043 16.3019 -999.2500 85.9696 118.2209 6376.5898 47.2403 55.3931 11950,0000 -999,2500 -999.25O0 88.O000 -999.2500 -999.2500 65,4356 ..... ~-99'~.2~ 55.5831 11975.00(X) -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 18.6048 -999.2500 -999.2500 -999.2500 55.5538 12000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.25(X3 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 7630,(:X3(X)00 Tape File End Depth = 12000,000000 Tape File Level Spacing = 0,250000 Tape File Depth Units =. Feet 48.5023 37.2834 56.4429 36.1185 71.8061 40,9338 54.0860 -999.2500 Tape Subtile 3 is type: US DEPTH RHOB NPHI RA NCNT FET PEF ROP WOBS DRHO RP GR FCNT 10227.0000 2.0593 4.2978 15.4099 -999.2500 -999.2500 6148.2676 -999.2500 37.5612 0.0839 754.8359 71.7993 41.5915 10227.2500 1.9983 15.2980 -999.25(X) 61 i8.3467'" -~99.250~ 3.3914 -999.2500 0.0514 744.60,39 78.3411 41.6789 10250.0000 2.0168 2.9485 15.4446 -999.2500 -999.2500 6079.3027 -999.2500 24.5056 -0.0171 1071.7551 34.1077 41.2835 '10275.0000 2.0742 2.3757 14.7173 -999.2500 75.2218 6167.9492 0.(ZXX) 32.2645 0.0320 739.5385 26.3266 43.6139 10300.0000 2.3680 3.4919 15.9857 -999.2500 97.4559 6276.4541 0.0(X)0 28.6807 0.0355 102.1524 10325.0000 2.2657 2.0331 18.6894 -999.2500 100.8933 6225.1807 0.00(X) 50.3225 0.0479 1362.6621 58.3079 34.9943 10350.0000 2.1373 2.8453 18.4662 -999.2500 57.6578 6179.7227 0.0000 49.3336 0.0437 294.6324 29.0065 35.1193 10375.0000 2.1680 3.3027 18.0018 -999.2500 96.1705 6119.2617 0.0000 52.2086 0.0328 311.5282 33.9672 35.6584 10400.(XXX) 2.2781 3.8500 23.0485 -999.2500 121.7238 6200.9043 0.0000 49.9205 0.0356 357.1400 24.4643 28.6187 10425.0000 2.2482 4.4414 22.3606 -999.2500 148.0556 6244.5723 0.0000 36.6889 0.0128 622.7400 23.1558 29.5789 10450.0000 2.1290 2.5951 21.3104 -999.2500 117.3531 6163.9170 0.0000 47.5118 10475.0000 2.1570 2.1187 21.1676 -999.2500 1 00.4492 6106.7715 ' 0.0000 52.9968 10500.~ 2.2160 2.4569 22.1980 -999.2500 67.4663 6172.1504 0.0000 51.1121 10525.0000 -999.2500 -999.25(;X) -999.2500 ...... ~99.25~ ....... t 09.311 3 -999.2500 0.0000 51.6386 10550.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 52.0279 10572.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999,2500 -999.2500 51.6140 Tape File Start Depth = 10227.000000 Tape File End Depth = 10572.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet 0.0839 1172.8730 0.0780 1021.5786 0.0557 356.1683 19.6105 30.5555 26.0842 30.5744 48.1658 29.4624 27.6304 -999.2500 -999.2500 Tape Subtile 4 is type: US DEPTH RHOB PEF NPHI RA ROP NCNT . FET WOBS 10227.0000 2.0593 4.2978 15.4099 -999.2500 -999.2500 6148.2676 -999.2500 37.5612 10227.2500 1.9983 3.3914 15.2980 -999.2500 -999.2500 6118.3467 .... :~99.2~ ..... 37.0508 10250.0000 2.0168 2.9485 15.4446 -999.2500 -999.2500 6079.3027 -999.2500 24.5056 10275.0000 2.0742 2.3757 14.7173 -999.2500 75.2218 6167.9492 O.O(XX3 32.2645 10300.0000 2.3680 3.4919 15.9857 -999.2500 97.4559 6276.4541 0.0000 28.6807 10325.0000 2.2657 2.0331 18.6894 -999.2500 100.8933 6225.1807 0.0000 50.3225 10350.0000 2.1373 2.8453 18.4662 -999.2500 57.6578 6179.7227 O.O(ZX) 49.3336 10375.0(XX) 2.1680 3.3027 18.0018 -999.2500 96.1705 6119.2617 O.CXXX) 52.2086 10400.0000 2.2781 3.8500 23.0485 -999.2500 121.7238 6200.9043 0.0000 49.9205 10425.0000 2.2482 4.4414 22.3606 -999.2500 148.0556 6244.5723 O.O(XX3 36.6889 DRHO RP 0.0839 754.8359 0.0514 744.6O.39 -0.0171 1071.7551 0.0320 739.5385 0.0355 102.1524 0.0479 1362.6821 0.0437 294.6324 0.0328 311.5282 0.0356 357.1400 0.0128 622.7400 GR FCNT 71.7993 41.5915 78.3411 41.6789 34.1077 41.2835 26.3266 43.6139 53.4568 40.9959 58.3079 34.9943 29.0065 35.1193 33.9672 35.6584 24.4643 28.6187 23.1558 29.5789 10450.(X)(X) 2.1290 2.5951 21.3104 -999.2500 117.3531 6163.9170- 0.0000 47.5118 10475.(:X300 2.1570 2.1187 21.1676 -999.2500 100.4492 6106.7715 0.0000 52.9968 10500.0000 2.2160 2.4569 22.1980 -999.2500 67.4663 6172.1504 0.0000 51.1121 10525.0000 -999.25(~ · :999.2500 ~ ' '.~999.2500 -999.25O0 0.0000 -999.2500 ' '"i09,3If3 51.6386 10550.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 52.0279 10572.0000 -999.2500 -999.2500 -999.25(X) -999.2500 -999.2500 -999.2500 -999.2500 51.6140 Tape File Start Depth = 10227.0(XX)00 Tape File End Depth = 10572.(;X)(XX)0 Tape File Level Spacing = 0,25(XX;X) Tape File Depth Units = Feet 0.0839 1172.8730 0.0780 1021.5786 0.0557 356.1683 -999.2500 203.1987 19.6105 30.5555 26.0842 30.5744 48.1658 29.4624 27.6304 -999.2~ Tape Subtile 5 is type: US DEPTH ARCM CPAM CPCM DRHO GRAM NPLM ~IPHI RA ROP RPTM TCDM RHOB CAAM CACM PEF DPLM DPSM GR GRCM NPAM NPSM PDCM RAAM RPAM RP RPDM WBCS 7630.0000 1.4891 -999.2500 427.6122 427.9562 469.8423 469.9730 -999.2500 -999.2500 -999.2500 -999.2500 127.5655 124.8769 194.1047 -999.2500 -~. z~3uu -~. 2~ -999.2~ 17.2411 2.3386 2.3367 -999.2500 2.1288 2.1282 2.0000 0.0000 -999.2500 -999.2500 7630.2500 1.4610 -999.2500 417.4584 417.8016 452.4978 452.6353 -999.2500 -999.2500 -999.2500 -999.2500 120.6943 120.5112 163.5056 -999.2500 -999.2500 -999.2500 -999.2500 16,8631 2.3954 2.3935 -999.2500 2.2100 2.2094 0.0(X~ 0.0000 -999.2500 -999.2500 7650.0000 1.3135 -999.2500 365.4373 365.7739 391.6078 391.7702 -999.2500 -999.2500 -999.2500 -999.2500 131.5383 134.1647 199.9931 -999.2500 -999.2500 -999.2500 -999.2500 15.4689 2.7370 2.7345 -999.2500 2.5585 2.5574 0.0000 1.0000 -999.2500 -999.2500 7675.0000 1.6366 -999.2500 482.4516 482.7970 467.4711 46;,~.6027 -999.2500 -999.2500 -999.2500 -999.2500 140.9785 141.3969 214.3460 -999.2500 -999.2500 -999.25(X) -999.2500 17.1903 2.0727 2.0713 -999.2500 2.1392 2.1386 0.0000 21.0000 -999.2500 -999.2500 7700.0000 1.8946 -999.2500 584.2412. 584.5682 581.3845 581.4761 -999.2500 -999.2500 -999.2500 -999.2500 120.6459 120.6051 183.4320 -999.2500 -999.2500 -999.2500 -999.2500 19.5213 1.7120 1.7110 555.3340 1.7202 1.7199 3.0(X~ 43.0000 126.0000 0.00(X) 7725.0000 1.2114 -999. 2500 330.8829 331.2132 238,6591 -999,2500 -999,2500 3,0192 35.(:X:XX) 7750,0000 274.8524 -999.2500 -999,2500 3,5873 32.0000 77-f5,0~ 309.3358 -999.2500 -999.2500 3,3317 42.0000 7800.0000 341.6434 -999.2500 -999.2500 3.1568 45.0000 7825,0000 313.6895 -999.2500 -999.25(X) 3,3299 47,0000 7850.0000 299,0192 -999.2500 -999.2500 3,1362 39.0(XX) 7875,0000 339,6653 -999,2500 -999.2500 2.7131 238,8810 105,0092 -999,2500 90,6691 122,0(XX) 1.0495 275.0616 102,7580 -999,2500 158,1021 122.0000 1.1167 309.5319 86.4193 -999.25O0 117.5883 124.0000 1.1672 341.9257 91.6477 -999.250O 78.3383 124.0(:X:X3 1,1167 313,9854. 107,2361 -999,2500 90,0118 126,(XXX) 1,1736 299,3218 81,1135 -999,2500 106,2609 126.0000 1,3211 339,9486 86,5162 -999.2500 83,1291 -999,2500 95,7088 -999,2500 4,1901 18,8255 -999.2500 -999,25(X) 97,9629 -999,2500 3,6383 14.9823 -999,2500 -999,2500 85,9600 -999,2500 3,2327 16,2129 -999.2500 -999.25O0 93.1008 -999.2500 2.9270 10.2838 -999,2500 -999,2500 101,2376 -999,2500 3,1879 10,7133 -999,2500 -999,25(X) 79,9032 -999.25O0 3,3443 14.0742 -999,2500 -999,2500 82,8689 -999,2500 2,9441 -999,25O0 159,6576 11,4097 4,1862 278,4438 -999,25(:X) 156,2350 12,4660 3,6355 -299,8258~ -999,2500 131,3934 13,4108 3,2307 316,2838 -999,2500 139,3427 14,2496 2,9246 299,8259 -999,2500 163,0435 13,5264 3,1849 318,3578 -999,2500 123,3263 13,1338 3,3409 368,0506 -999,2500 131,5406 14,1992. 2,9416 -999,2500 -999,2500 3,0222 O,(XX:X) 278,7575 -999.2500 -999.2500 3,5914 3,0000 300,1473 -999,2500 -999,2500 3.3353 3,(XX:X) 316,7798 -999,2500 -999.2500 3,1617 4,0000 300,3092 -999.2500 -999,2500 3,3353 O,(:X:X:X) 318,8555 -999,2500 -999,2500 3,1411 3,0000 368,5847 -999,2500 -999,2500 2,7170 0,0000 37.(:XXX) 127.0(XX) 12.7502 7900.00130 1.4816 -999.2500 424.8962 425.4674 386.3835 386.6427 -999.2500 -999.2500 -999.2500 -999.2500 79.0488 78.7736 120.1871 -999.2500 -999.2500 -999.2500 -999.2500 15.3482 2.3535 2.3504 95.2749 2.5881 2.5864 O.(:XXX) 41.0000 128.0000 16.5948 7925.0(:XX) 1.4265 -999.2500 464.4731 464.6913 -999.2500 -999.2500 96.4612 90.1181 -999.2500 -999.2500 -999.2500. 2.4653 106.3657 2.1530 41.0000 130.0000 15.7758 405.0685 -999.2500 146.6611 17.1227_ · '2.1520 405.6296 -999.25(:X:) -999.2500 2.4687 4.(X)(:X) 7950.0000 1.1358 -999.2500 306.0347 306.5230 357.9189 358.1930 -999.2500 -999.2500 -999.2500 -999.2500 62.6012 69.4953 95.1799 -999.2500 -999.2500 -999.2500 -999.2500 14.6574 3.2676 3.2624 133.4276 2.7939 2.7918 2.(X:X:X) 46.0000 130.(:X:XX) 15.8352 7975.0(:X)0 1.3173 -999.2500 366.7479 367.2810 370.8885 371.1556 -999.2500 -999.2500 -999.2500 -999.2500 96.1499 95.9929 1 46.1880 -999.2500 -999.2500 -999.2500 -999.2500 14.9759 2.7267 2.7227 70.1342 2.6962 2.6943 3.0000 111.0000 130.0000' 10.7218 8000.0000 1.2909 -999.2500 357.6835 358.2103 352.4359 352.7128 -999.2500 -999.2500 -999.2500 -999.2500 107.2683 107.4520 163.0926 -999.2500 -999.2500 -999.2500 -999.2500 14.5211 2.7958 2.7917 84.9939 2.8374 2.8352 3.(:XX)O 121.(XXX3 132.(XX:IO 15.1181 8025.(:XXX) 1.4579 -999.2500 416.3235 416.8893 456.830~ 457.0527 -999.25(X) -999.2500 -999.25(X) -999.2500 88.7431 92.0617 134.9264 -999.2500 -999.2500 -999.2500 -999.2500 16.9584 2.4020 2.3987 55.7208 2.1890 2.1879 2.0(XX) 64.0000 124.(:X:XZ) 15.6103 8050.0000 1.3475 -999.2500 377.2263 377.7667 383.7871 384.0476 -999.2500 -999.2500 -999.25(X) -999.2500 83.7083 86.0363 127.2715 -999.2500 -999.25(X:1 -999.2500 -999.2500 15.2871 2.6509 2.6471 81.1374 2.6056 2.6038 4.0000 57.0000 130.(XXX) 10.3186 8075.0000 328.8442 -999.2500 -999.2500 2.9238 41.0000 8100.0000 828.0935 -999.2500 -999.2500 1.3980 37.0000 · 1.2432 329.1328 106.0742 -999.2500 76.9226 132.0000 2.2026 828.1451 86.4678 -999.2500 98.1695 132.0000 -999.2500 341.5419 342.0568 -999.2500 -999.2500 -999.2500 110.7325 161.2769 -999.2500 -999.2500 13.9224 2.9282 3.0410 3.0383 3.00~ 8.5788 -999.2500 715.6667 716,2495 -"999.2~ ........ -99~.2~ -9cJ~.2500 85.9641 131.4670 -999.2500 -999.2500 23.8755 1.3,991 1.2076 1.2075 3.0000 6.9196 8200.00(X) 1.5488 -999.2500 449.5347 450.1204 431.6291 431.8644 -999.2500 -999.2500 -999.2500 -999.2500 93.8625 93.7151 142.7101 -999.2500 -999.2500 -999.2500 -999.2500 16.3980 2.2245 2.2216 92.9306 2.3168 2.3156 3.0(ZX) 52.0000 134.0000 14.2694 8175.~ 1.5037 -999.2500 432.9503 433.5262 413.1358 413.3809 -999.2500 -999.2500 -999.2500 -999.2500 97.0504 96.0604 147.5570 -999.2500 -999.25(X) -999.25(X) -999.2500 15.9702 2.3097 2.3067 110.5385 2.4211 2.4197 0.0000 45.4460 132.0000 13.4818 8150.0000 1.4643 -999.2500 418.6069 419.1743 419.2144 419.4564 -999.2500 -999.2500 -999.2500 -999.2500 108.6884 108.1020 165.2516 -999.25(X) -999.2500 -999.2500 -999.25(X) 16.1158 2.3889 2.3856 96.2504 2.3854 2.3840 3.0000 69.0000 138.0(XX) 14.0190 8125.~ 1.5878 -999.2500 464.1497 464.7432 456.8308 457.0527 -999.2500 -999.2500 -999.25(X) -999.2500 108.6884 93.0856 165.2516 -999.2500 -999.2500 -999.2500 -999.2500 16.9584 2.1545 2.1517 64.2231 2.1890 2.1879 3.0000 65. ~(~ 134. O(X)O 13.2679 8225.0(XX) 480.7801 -999.25(X:1 -999.2500 2.1453 49.0(XX) 1.5919 480.9898 75.8980 -999.2500 50.7841 134.0000 -999.2500 -999.2500 76.8529 -999.2500 2.0800 10.8745 465.6013 -999.2500 115.3,966 17.4765 2.0791 466.1958 -999.2500 -999.2500 2.1481 3,.0000 8250.0000 180.2497 -999.2500 -999.2500 2.8309 44.0000 1.2763 180.5932 35.8763 -999.2500 35.0339 138.0000 -999.2500 -999.2500 38.1198 -999.2500 5.5479 10.2125 352.7163 -999.2500 54.5500 9.5276 5.5373 353.2416 -999.2500 -999.2500 2.8351 3.0000 8275.0000 410.6847 -999.2500 -999.2500 2.3594 45.00(X) 1.4770 410.9311 106.0742 -999.2500 108.0981 138.0000 -999.2500 -999.2500 101.0840 -999.2500 2.4350 10.6242 423.2737 -999.2500 161.2769 15.9198 2.4335 423.8438 -999.2500 -999.2500 2.3625 3.00(X) 8300.0(X~ 432.5370 -999.25(X) -999.2500 2.3713 36.6480 1.4713 432.7720 101.2331 -999.2500 113.4268 138.0000 -999.2500 -999.2500 101.5133 -999.2500 2.3142 8.5830 421.1772 -999.2500 153.9165 16.4162 2.3129 421.7462 -999.2500 -999.2500 2.3745 0.0000 8325.0000 423.1359 -999.2500 -999.2500 2.2879 33.0000 1.5135 423.3757 93.7294 -999.2500 122.3990 138.0(XX) -999.2500 -999.2500 93.6091 -999.2500 2.36,33 10.5758 436.5089 -999.2500 142.5077 16.2050 2.3620 437.0870 -999.2500 -999.2500 2.2909 3.0000 8350.0000 417.1937 -999.25(X3 -999.2500 2.3538 31.9370 1.4799 417.4366 104.4282 -999.2500 88.2902 140.0000 -999.2500 -999.2500 105.0937 -999.2500 2.3970 12.1434 424.2830 -999.250O 158.7744 16.0697 2.3958 424.8538 -999.2500 -999.2500 2.3569 0.00~ 8375.0000 440.6257 -999.2500 -999.2500 1.4899 440.8563 106.6874 -999.2500 -999.2500 -999.2500 108.0858 -999.25OO 427.9261 -999.2500 162.2093 16.6000 428.4991 -999.2500 -999.2500 2.3369 2.3337 34.0000 8400.(X:XX) 403.6809 -999.2500 -999.2500 2.4798 42.0000 8425.0000 420.4692 -999~2500 -999.2500 2.3608 42.0000 8450.0000 365.6013 -999.2500 -999.2500 2.5553 37.3860 8475.0000 494.6797 -999.2500 -999.2500 2.0815 53.0000 8500.0000 400.7516 -999.2500 -999.2500 2.3538 6g.o(xx) 8525.0000 480.6630 -999.2500 -999.2500 2.1316 96.0000 8550.0000 90.0995 140.0000 1.4199 403.9310 -96.5656 -999.25(X) 131.23,36 142.~ 1.4764 420.7105 96.0047 -999.2500 142.7900 142.0000 1.3863 365.8713 103.0727 -999.2500 51.3815 142.0000 1.6296 494.8823 101.1944 -999.2500 146.1379 144.0(ZX) 1.4799 401.0032 110.1891 -999.2500 99.2254 144.(XXX) 1.5998 480.8727 137.2508 -999.2500 109.3471 142.0000 1.4314 2.2695 8.0093 -999.2500 -999.2500 98.2484 -999.2500 2.4772 12.7077 -999.2500 -999.2500 96.6546 -999.2500 2.3783 12.7035 -999.2500 -999.2500 104.9865 -999.2500 2.7352 11.8845 -999.2500 -999.2500 98.1681 -999.2500 2.0215 10.0258 -999.2500 -999.2500 110.7286 -999.2500 2.4953 10.0937 -999.2500 -999.2500 135.2955 -999.2500 2.0805 19.3553 -999.2500 402.6931 -999.2500 146.8504 15.7571 2.4757 423.0124 -999.2500 !45.9672. 16.1447 2.3769 390.7935 -999.2500 156.7134 14.8467 2.7332 479.8191 -999.2500 153.8576 17.7710 2.0207 424.2830 -999.2500 167.5334 15.6884 2.4937 468.5348 -999.2500 208.6785 17.4735 2.0796 406.8149 403.2503 ~999.2500 -999.2500 2.48,33 3.00(X) 423.5624 -999.2500 -999.25O0 2.3640 3.0000 391.3430 -999.2500 -999.2500 2.5589 0.0000 480.4211 -999.2500 -999.25(X) 2.0841 0.0000 424.8538 -999.2500 -999.2500 2.3569 3.0000 469.1309 -999.2500 -999.2500 2.1343 3.0000 407.3748 407.6080 -999.25OO -999.2500 2.4552 72.0(XX) 8575.0(:X)0 333,5032 -999.2500 -999.25(X) 2.8977 28.0(:X30 8600.0000 387.1767 -999.2500 -999.2500 2.6262 35.0000 8625.(X:X)O 589.9485 -999.2500 -999.2500 1.7227 35.0000 8650.(:X:X)O 546.8573 -999.2500 -999.2500 1.7797 33.0(X:X3 8675.0(XX) 432.9,.305 -999.2500 -999.25(30. 2.2079 30.O0(X) 8700.0000 371.8051 -999.2500 -999.2500 2.5787 407.8561 212.4814 -999.2500 117.0561 142.0(X)0 1.2523 3.33.7895 207.9792 -999.2500 131.2962 142.(:X:X:X) 1.3562 387.4354 249.4029 -999.2500 132.9085 144.0000 1.88,39 5,90.1051 160.3913 -999.2500 138.7834 144.0000 1.8380 547.0336 190.2124 -999.25O0 161.3672 144.0000 1.5564 433.1653 208.9249 -999.2500 127.7710 144.(:XX)0 1.3763 372.0718 189.5831 -999.2500 121.8614 -999.2500 206.1322 -999.2500 2.4535 18.5194 -999.2500 -999,2500 208.1437 -999.2500 2.9985 19.2920 -999.2500 -999.25O0 250.2940 -999.25O0 2.5830 21.0018 -999.2500 -999.25(X:) 164.6866 -999.2500 1.6951 22.6865 -999.2500 -g99.2500 201.1050 -999.2500 1.8286 20.5350 -999.2500 -999.2500 210.3142 -999.2500 2.3098 18.6170 -999.2500 -999.2500 189.2239 -999,2500 2.6903 -999.2500 323.0603 15.8482 2.4521 344.5845 -999.2500 316.2151 14.0421 2.9959 380.2366 -999.2500 379.1963 15.3677 2.5813 579.8535 -999.2500 243.8616 19.6854 1.6946 561.2596 -999.2500 289.2021 18.6415 1.8280 452.3344 -999.2500 317.6528 16.4274 2.3086 387.2745 -999,2500 268.2452 14.9973 2.6884 -999.2500 -999.2500 2.4585 3.(XXX) 345.1016 -999.2500 -999.2500 2.9021 2.0000 380.7791 -999.2500 -999.2500 2.6299 O.(:XX:X) 580.4911 -999.2500 -999.25(X) 1.7246 3.(:X:X)O 561.8955 -999.2500 -999.25(X) 1.7817 3.0000 452.9217 -999.2500 -999.25(X) 2.2108 0.0000 387.8217 -999.2500 -999.2500 2.5824 3.0000 8725.0OO0 297.4537 -999.2500 -999.2500 3.3382 38.0000 8750.0000 251.7310 -999.2500 -999.2500 4.5341 545.0000 8775.0000 249.3292 -999.25OO -999.25OO 3.8527 566.OOOO 88OO.OOOO 172.6778 -999.2500 -999.25OO 6.3548 84.OOOO 8825.0(X30 285.3118 -999.25OO -999.2500 3.14,39 72.OOO0 8850.0000 228.1149 -999.25OO -999.2500 4.3555 52.0000 8875.0000 246.5630 142.0(XX) 1.1144 297.7571 175.4955 · -999,2500 146.2959 144.0000 0.8581 252.0536 175.6891 -999.2500. 120.4705 144.0000 0.9875 249.6526 135.7985 -999.2500 110.3611 144.0000 0.6,339 173.0226 158.6001 -999.25OO 52.3808 134.0000 · 1.1712 285,6206 155.7438 -999.2500 81.7205 130.0000 0.8886 228.4459 125.1965 -999.2500 70.9715 128.0(XX) 0.8442 246.8875 16.7634 -999.2500 -999.2500 181.9331 -999.2500 3.3619 18.7613 -999.2500 -999.25OO 171.0076 -999.25O0 3.9725 13.6351 -999.2500 -999.2500 141.1057 -999.2500 4.0108 16.9450 -999.2500 -999.2500 160.1680 -999.2500 5.7911 11.8613 -999.2500 -999.2500 157.9563 -999.25OO 3.5050 5.3899 -999.2500 -999.2500 125.6390 -999.25OO 4.3838 10.0111 -999.2500 -999.2500 299.0834 -999.2500 266.8262 13.0914 3.3584 220.1385 -999.2500 267.1207 11.7996 3.9674 259.1057 -999.2500 206.4703 11.7285 4.0058 157.0306. -999.2500 241.1382 9.2639 5.7796 317.5919 -999.2500 236.7955 12.7579 3.5012 229.1726 -999.2500 190.3509 11.0880 4.3774 216.0980 -999.2500 299.5662 -999.2500 -999.2500 3.3435 O.(:X:X:X) 220.5515 -999.25OO -999.25OO 4.5426 3.00OO 259.5552 -999.2500 -999.2500 3.8594 3.OO(X) 157.3605 -999.25OO -999.2500 6.3682 3.0000 318.0889 -999.2500 -999.25OO 3.1488 229.5954 -999.2500 -999.25OO 4.3635 3.0000 216.5064 -999.2500 -999.25(X) 126.2131 123.2375 191.8966 -999.2500 -999.2500 -,999.2500 -999.2500 11.6465 4.6275 4.6188'- 119.0841 4.0558 4.0504 3.(:X:X:X:) 53.0000 132.1:XX)0 17.9815 8899.(:X:XX)· ~ 0.8632 -999.2500 222.1699 222.5826 260.3392 260.6573 -999.2500 -999.2500 -999.2500 -999.2500 131.0732 131.2744 199.2859 -999.2500 -999.2500 -999.2500 -999.2500 12.0170 4.5554 4.5468 98.5307 3.9016 3.8966 3.(X:X:X) 50.0000 134.0000 12.9827 Tape File Start Depth = 7630.(:X:X:X:X~ Tape File End Depth = 8899.(XX:XX:)0 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 6 is type: IJ$ DEPTH ARCM CPAM CPCM DRHO GRAM NPLM NPHI RA ROP RPTM TCDM RHOB PEF GR NPSM RPAM WBCS CAAM DPLM GRCM PDCM RP CACM DPSM NPAM RAAM RPDM 8925.0000 0.7348 -999.2500 184.7752 185.1447 187.4181 187.7600 -999.2500 -999.2500 -999.2500 -999. 2500 125.6806 122.7079 191.0869 -999.2500 -999.2500 -999.2500 -999.2500 9.7693 5.4154 5.4045 106.1661 5.3450 5.3352 2.0000 1296.00(30 136.0000 15.3293 8950.0(XX) 0.6082 -999.2500 1 50.1299 1 50.3275 153.2652 153.4810 -999.2500 -999.2500 -999.2500 -999. 2500 105.8224 111.5298 160.8942 -999.2500 -999.2500 -999.2500 -999.2500 8.5611 6.6609 6.6521 56.3799 6.5246 6.5155 0.0000 151.8590 129.0588 21.4579 8975.0(X)0 0.7887 -999.25(X) 200.0157 200.2538 8900.0000 0.7767 -999.2500 196.6058 196.9907 225.4785 225.8103 -999.2500 -999.25(X) -999.2500 -999.2500 1 29.9892 131.0374 197.6377 -999.2500 -999.2500 -999.2500 -999.2500 11.0056 5.0864 5.0764 90.8654 4.4357 4.4292 3.0000 1255.00(X) 134.0000 13.1354 8899.2500 0.7804 -999.2500 197.9127 198.2981 227.9319 228.2626 -999.2500 -999.2500 -999.2500 -999.2500 135.1346 133.1741 205.4609 -999.2500 -999.2500 -999,2500 -999.2500 11.0738 5,0527 5.0429 103.1094 4.3873 4.3809 3.0000 1254.0(XX) 134.0(XX) 13.4155 8899.0000 0.8632 -999.2500 222.1699 222.5826 260.3392 260.6573 -999.2500 -999.25(X) -999.2500 -999.2500 131.0732 131.2744 199.2859 -999.2500 -999.2500 -999.2500 -999.2500 12.0170 4.5554 4.5468 98.5307 3.9016 3.8966 3.0(X~ 50.0000 134.0000 12.9827 215.6153 -999.2500 -999.25(Xl. 4.9937- 158.0000 215.8174 156.5959 -999.2500 22.0952 110.0000 -999.2500 154.9575 -999.2500 4.6379 61.0662 -999.2500 238.09O9 10.6968 4.6335 -999.2500 -999.2500 4.9996 3.0000 9000.0000 298.7366 -999.2500 -999.2500 3.3049 142.0000 · 1.1243 298.9107 187.6176 -999.2500 21.1045 118.0000 -999.2500 -999.2500 185.5650 -999.2500 3.3474 61.2996 302.3010 -999.2500 285.2569 13.1261 3.3455 302.5806 -999.2500 -999.2500 3.3080 3.0000 90~51~ ,~ 0,7235 .--9,~,2~ 189.2968 189.5058 -999.2500 -999.2500 227.1209 218.1686 -999.2500 -999.25(X) -999.2500 5.5005 23.4403 5.2828 118.0000 118.33,33 51.8620 18!,5,,777. -999.2500 345.3184 9.8363 5.2769 !8'!, -999.2500 -999.2500 5.5073 3.0000 9050.0000 179.0873 -999.2500 -999.2500 5.4463 110.(XXX) 0.7299 179.2986 181.2564 -999.2500 40.4130 122.0000 -999.2500 -999.2500 182.8731 -999.2500 5.5839 51.1151 163.3854 -999.2500 275.5853 9.4876 5.5773 183.6112 -999.2500 -999.2500 5.4530 O.(X:XX) 9075.0000 157.7551 -999.2500 -999.2500 5.6614 97.7570 0.7049 157.9703 268.5413 -999.2500 53.4267 122.0000 -999.2500 -999.2500 270.1844 -999.2500 6.3391 51.7856 176.4485 -999.2500 408.2947 8.7277 6.3305 176.6685 -999.2500 -999.25(:X) 5.6684 0.0000 9100.0000 141.5460 -999.2500 -999.2500 6.3014 90.0000 0.6393 141.7632 203.5012 -999.2500 47.1105 126.0000 -999.2500 -999.2500 205.2647 -999.2500 7.0648 68.0627 158.4906 -999.2500 309.4066 8.1183 7.0540 156.6951 -999.2500 -999.2500 6.3095 4.0(XX) 9114.0000 143.4487 -999.2500 -999.2500 6.2587 0.6434 143.6657 238.7396 -999.2500 61.5261 -999.2500 -999.2500 227.5683 -999.2500 6.9711 159.5724. -999.2500 362.9836 8.1916 6.9606 159.7778 -999.2500 -999.2500 6.2667 0.0000 369.0460 128.0000 69.2339 Tape File Start Depth = 8899.000000 Tape File End Depth = 9114.~ Tape File Level Spacing = 0.250000 Tape File Depth' Units = Feet Tape Subfile 7 is type: US DEPTH ARCM CPAM CPCM DRHO GRAM NPLM NPHI RA ROP RPTM TCDM RHOB CAAM CACM PEF - DPLM DPSM GR GRCM NPAM NPSM PDCM RAAM RPAM RP RPDM WBCS 9114.0000 0.6434 -999.25(:X3 159.5724 159.7778 143.4487 143.6657 -999.2500 -999.2500 -999.2500 -999.2500 238.7396 227.5683 362.9836 -999.2500 '"'"'" '"'"'""' '""'"' "'""'" · ..... 999.2~ 8.1916 6.2C~7 6.2587 61.5261 6.9711 6.9606 0.0000 369.0460 128.0000 69.2339 9114.2500 0.6354 -999.2500 157.4214 157.6250 139.2978 139.5152 -999.2500 -999.2500 -999.2500 -999.2500 212.9171 226.4989 323. 7228 -999.2500 -999.2500 -999.2500 -999.2500 8.0305 6.3536 6.3454 56.9445 7.1852 7.1740 0.(:XXX) 652.0909 128.0000 67.3142 9125.0000 0.6466 -999.2500 160.4594 160.6656 152.0390 152.2550 -999.2500 -999.2500 -999.25(:X) -999.25(:X) 197.1836 202.6883 299.8012 -999.2500 -999.2500 -999.2500 -999.2500 8.5164 6.2321 6.2241 91.1988 ,, 6.5773 6.5679 4.0000 687.0000 128.(X)(X) 61.4828 9150.0000 0.3918 -999.2500 94.8911 95.0435 96,5394 96.7565 -999.2500 -999.2500 -999.2500 -999.2500 286.1436 278.8029 435.0574 -999.2500 -999.25(:X:) -999.2500 -999.2500 6.2403 10.5384 10.5215 54.1351 10.3585 10.3352 3.0000 678.0(X30 132.(:XXX) 57.9055 9175.0(XX) 0.5041 -999.2500 122.9354 123.1107 94.3614 94.5782 -999.2500 -999.2500 -999.2500 -999.2500 188.8569 182.2790 287.1412 -999.25(X) -999.2500 -999.2500 -999.2500 6.1409 8.1344 8.1228 68.6515 10.5976 10.5733 0.0000 682.0000 132.0(XX) 53.4413 9200.0000 0.8079 -999.2500 205.5379 205.7798 163.7876 -999.2500 -999.2500 4.8598 87.1920 9225.0000 148.0970 -999.2500 -999.2500 5.368O 94.OOOO 187.2476 -999.2500 -999,2500 4.2171 111.0000 9275.O000 315.9731 -999.2500 -999.2500 2.7831 113.00(30 9300.0000 116.4556 -999.2500 -999.2500 7.4O52 103.00(~ 9325.OOOO 259.6620 -999.2500 -999.25OO 2.4319 103.00(~ 935O.OO0O 310.6342 -999,2500 -999.2500 2.3268 164.0018 2O6.2849 -999.2500 53.1487 124.0000 0.7394 148.3135 248.4659 -999.2500 62.0010 124.0000 U.~ I,~h3 187.4583 188.9537 -999.25O0 69.1969 126.0000 1.2946 316.1418 203.7675 -999.2500 40.2974 128.0(XX) 0.5502 116.6752 171.0901 -999.2500 56.7353 128.00(X) 1.4429 259.8514 133.0875 -999.2500 48.7816 130.0000 1.4943 310.8051 105.2996 -999.2500 65.2659 -999,25O0 212.5842 -999,2500 6.1055 43.2694 -999.2500 -999.2500 244.0746 -999.2500 6.7523 52.4504 -999.250O 187.1672 -999.2500 5.3405 53.1972 -999.25O0 -999.25OO 2O9.7730 -999,2500 3.1648 54.1520 -999.2500 -999.2500 182.8008 -999.2500 8.5870 52.9638 -999.2500 -999.2500 134.5418 -999.2500 3.8515 53.2185 -999.2500 -999.2500 120.6829 -999.25O0 3.2194 -999.2500 313.6,,389 8.9464 6.0975 186.0625 -999.2500 374.7309 8.3681 6.7425 -999.2500 287.2884 9.7660 5.3345 359.0236 -999.2500 309.8115 13.5780 3.1631 134.8547 -999.2500 260.1282 7.1098 8.5708 410.9186 -999.25O0 202.3484 12.0310 3,8487 429.4945 -999.2500 160.0993 13.4452 3.2177 · . -999.2500 -999.2500 4.8653 O.O(X~ 186.2903 -999.2500 -999.2500 5.3745 2.0(X~ 237. I320 -999.2500 -999.2500 4.2217 3.0000 359.3119 -999.2500 -999.2500 2.7853 4.0000 135.0409 -999.2500 -999.2500 7.4154 4.0000 411.2070 -999.25(X) -999.2500 2.4336 0.0000 429.7821 -999.2500 -999.2500 2.3283 0.0000 93.0590 128.3,3,33 51.9793 9375.0(:XX) 1.3821 -999.2500 389.3118 389.6007 321.2113 321.3781 -999.2500 -999.2500 -999.2500 -999.2500 139.3809 138.1807 211.9171 -999.2500 -999.2500 -999.2500 -999.2500 13.7205 2.5686 2.5667 44.8620 3.1172 3.1155 2.0000 89.0000 132.~ 52.7092 9400.0(X)0 0.1169 -999.2500 30.6279 30.7114 31.0638 31.2524 -999.2500 -999.2500 -999.2500 -999.2500 119.1258 121.6203 181.1208 -999.2500 -999.2500 -999.2500 -999.2500 2.6597 32.6500 77.0000 132.0(X)0 52.0982 9425.00(~ 0.0158 -999.2500 6.0131 6.0326 · 5.0440 5.1876 -999.2500 -999.2500 -999.2500 -999.2500 71.6056 71.4175 108.8703 -999.2500 -999.2500 -999.2500 -999.2500 0.5545 166.3030 165.7659 71.2338 198.5107 193.0048 3.0000 106.(XXX) 134.0000 41.0140 9450.0(XX) 0.0158 -999.2500 6.0131 6.0326 8.9246 9.0791 -999.2500 -999.2500 -999.2500 -999.2500 70.0806 68.7986 106.5518 -999.2500 -999.2500 -999.2500 -999.2500 0.9273 166.3030 165.7659 46.6423 112.0504 110.1436. 2.0(X~ 108.~ 134.0000 33.7491 9458.0000 0.0158 -999.2500 6.0131 6.0326 8.4096 8.5628 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.25(X) 0.8798 166.3030 165.7659 137.5590 119.0675 116.9321 3.0(X~ 113.0(XX) 134.(XXX) 40.1398 Tape File Start Depth = 9114.~ Tape File End Depth = 9458.(XXX:XX) Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 8 is type: US DEPTH ARCM CPAM CPCM DRHO GRAM NPLM NPHI RA ROP RPTM TCDM RHOB PEF GR NPSM RPAM WBCS CAAM DPLM GRCM PDCM RP CACM DPSM NPAM RAAM RPDM 9520.0000 12.7503 -999,2500 11389,5059 11364.7012 21.7447 21.7436 -999.2500 -999.2500 -999.2500 -999.2500 124.2642 126.0206 132.0506 32.2866 33.1704 37.24'°-,,5 ~'~ ~'~": I 9!'~ n · ~d~l .;---il ~,dP'~d, . dq.~ 0.0880 86.4229 49.6545 49.6568 3236.0(:X:)0 138.0000 46.8616 9520.2500 12.7233 -999.2500 11354.2578 11329.5156 20.2432 20.2422 -999.2500 -999.2500 -999.2500 -999.2500 123.4844 123.9431 131.2220 32.9941 33.8951 37.9474 37.9311 1.7970 0.0881 0.0883 98.6638 56.2914 56.2935 0.(:X300 3235.4229 138.0000 48.6015 9525.0000 12.7147 -999.2500 11334.0488 11309.5742 18.8009 18.8001 -999.2500 -999.2500 -999.2500 -999.2500 173.8133 171.5746 181.7823 22.3273 22.9585 27.3458 27.3770 1.7384 0.0882 0.0884 111.0303 53.1888 53.1911 2.0000 3230.0000 138.0000 33.3417 9550.0000 0.0801 -8.0230 22.4133 22.4133 20.4723 20.4714 -0.2400 627.6633 646.8511 -12.8564 147.8649 151.1639 154.6442 15.8021 16.2624 20.8223 20.9768 1.8832 44.6164 44.6164 38.9969 48.8465 48.8487 3.0000 65.0000- 118.9625 5.7926 9575.0(X~ 0.1668 2.0940 42.4608 42.4608 17.2709 17.2702 1.0364 36.1867 33.8662 -0.1608 35.8508 35.8860 37.4945 5.8731 6.0591 10.8028 10.8385 1.6329 23.5511 23.5511 67.8646 57.9009 57.9032 2.0000 39.0000 121.6625 66.0763 -999.2500 9600.00(X) -999.2500 2.0820 -999.2500 0.0288 5.9371 -999.25(X3 38.0(X30 -999.2500 22.7095 10.6826 95.3536 121.9719 1.7812 23.2210 10.6871 -999.2500 64.8363 38.2299 23.7507 -999.2500 -999.2500 35.9837 5.7545 -999.2500 O.O(X)O 9625.0000 -999.2500 -0.0070 7.4366 -999.2500 39.8000 -999.2500 27.7803 12.1603 112.3212 122.4500 2.0500 2.1417 24.2072 12.1480 -999.2500 43.1434 -999.2500 39.0980 29.0540 -999.2500 -999.2500 -999.2500 36.8834 7.2127 -999.2500 0.0000 -999.2500 -0.0036 5.8374 -999.2500 47.0000 ~999.2500 ' -999.250O 23.0842 10.5843 90.8541 123.7719 2.0300' 2.3870 22.9767 10.6072 -999.2500 46.4129 .... 999.2500 39.2924 24.1425 -999,2500 -999.2500 -999.2500 37.0849 5.6575 -999.2500 3.0000 9675.00(X) -999.2500 -0.0950 6.9968 -999.2500 52.9810 -999.2500 -999.2500 23.2101 11.7271 112.8625 124.5875 2.2010 -0.24(X) 23.3630 11.7038 -999.2500 52.2459 -999.2500 29.7402 24.2743 -999.2500 -999.25(X) -999.2500 27.1853 6.7850 -999.2500 O.(ZX)O 9700.0000 0.7018 0.0032 7.8557 -999.2500 50.0000 -999.2500 0.7022 45.3747 12.5731 60.9399 125.3750 2.2050 3.1592 42.2543 12.4330 1424.9097 50.5770 -999.2500 29.2829 47.4551 0.0819 1424.0618 -999.2500 26.7114 7.6204 -999.2500 3.0000 9725.00(~ 7.0162 0.0150 12.7161 -999.25(X) 62.8460 -999.2500 7.0163 65.3865 17.3495 54.2432 126.5000 2.4840 3.0981 65.3866 16.8927 143.0138 52.2237 -999.2500 12.0549 68.3844 0.7427 143.0124 -999.2,500 8.8569 12.3495 -999.2500 0.0000 9750.~ 10.6211 -0.0366 10.9172 -999.2500 -999.2500 10.6209 61.5319 15.5838 51.2876 2.4070 2.8595 62.7577 15.5768 94.1520 -999.25O0 16.8382 64.3530 1.0738 94.1536 -999.2500 13.8141 10.5987 -999.2500 4.(ZX:X) 73.0000 127.5125 40.0698 9775.0(XX) -999.2500 2.1550 -999.2500 -999.2500 -999.2500 -999.25(X) -0.2400 32.4679 30.0122 -0.1026 27.3631 27.2088 28,6177 7.6520 7.8883 12.6052 12.5124 -999.2500 -999.2500 -999.2500 · 57.5047 -999.2500 -999.2500 2.~ 73.0000 127.9625 0.0(300 9800.00(~ -999.2500 2.06,90 -999.2500 -999.2500 -999.2500 -999.2500 1.8853 37.9644 35.7086 -0.0030 19.7413 20.1856 20.6464 6.2305 6.4266 11.1652 11.1972 -999.2500 -999.2500 -999.2500 66.2700. -999.2530 -~999.2500 0.0000 62.0000 128.5250 37.0937 9825.0000 -999.2500 2.1090 -999.2500 -999.2500 -999. 2500 -999.2500 1.8268 33.9934 31.5932 -0.0328 21.7567 21.7635 22.7542 5.9631 6.1516 10.8941 10.9192 -999.2500 -999.2500 -999,2500 64.4922 -999.2500 -999.2500 3.0000 59.0000 129.0875 36.8900 9850.0000 -999.2500 2.1680 -999.2500 0.1972 0.1976 2.4876 31.2276 -0.0421 32.7404 32.6144 34.2415 11.9799 16.6272 16.1929 0.0204 -999.2500 81,0992 5072.1738 5061.1006 75.0000 132.6125 37.0513 9864.0000 -999.2500 2.4510 -999.2500 0,4223 0.4228 2.4521 14.9002 -0.0170 27.4493 26.2600 28.7077 5.1298 9.8863 9.4904 0.0479 -999.2500 80.4326 2387.7393 2365.3555 77.0000 134.5625 38.3498 -999.2500 28.7268 11.6329 -999.2500 O.(XX:X) -999.2500 11.8057 4.9695 -999.2500 3.0000 Tape File Start Depth = 9520.(XXXX30 Tape File End Depth = 9864.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 9 is type: US DEPTH ARCM CPAM CPCM DRHO GRAM NPLM NPHI RA ROP RPTM TCDM RHOB CAAM CACM PEF DPLM DPSM GR GRCM NPAM NPSM PDCM RAAM RPAM RP RPDM WBCS 9864.0000 -999.2500 2.4510 -999.2500 -999.2500 0.4223 0.4228 2.4521 14.9002 11.8057 -0.0170 27.4493 26.2600 28.7077 4.9695 5. i296~ ~ ~.8~ ......... 9.4904 ......... 0.0479 -999.2500 -999.2500 80.4326 2367.7393 2365.3555 3.0000 77.0000 134.5625 38.3498 9864.2500 -999.2500 2.4620 -999.2500 -999.25(X) 0.3760 0.3764 2.2921 15.1209 12.0344 -0.0208 27.1666 26.6678 28.4122 4.6401 4.7910 9.5519 9.4929 0.0423 -999.2500 -999.2500 76.3160 2700.6753 2697.5142 3.0000 76.0000 134.60(X) 38.2437 9875.0000 0.0080 2.5280 3.4890 3.4890 56.9827 56.9778 3.8724 11.0213 7.7857 0.0367 72.4610 73.2936 75.8041 10.7410 11.0634 15.7273 15.7295 4.2385 291.3641 291.3641 18.6817 17.5492 17.5507 3.(X3(X3 830.0000 135.7250 38.4517 9900.00~ -999.2500 2.2890 -999.2500 -999.2500 -999.2500 -999.2500 3.1270 21.6322 18.7825 -0.0475 14.1355 13.9068 14.7836 2.8634 2.9633 7.7467 7.7261 -999.2500 -999.2500 -999.2500 36.0766 -999.2500 -999.2500 2.0000 828.0(XX~ 136.7375 34.3948 9925.0000 -999.2500 2.3890 -999.2500 -999.2500 -999.2500 -999.2500 2.0584 18.8456 15.8,946 0.0396 17.6351 17.6521 18.4436 5.6448 5.8244 10.5714 10.4610 -999.2500 -999.2500 -999.2500 32.5059 -999.2500 -999.2500 2.0000 83.00(X) 127.2312 50.0869 9950.0000 -999.2500 2.2460 -999.2500 -999.2500 -999.2500 -0.0254 5.4995 -999.2500 120.0000 9975.0(XX) -999.2500 0.0307 5.3051 -999.2500 91.6380 10000;~ -999.2500 0.0293 8.2218 -999.2500 57.0000 10025.0000 -999.25(X) 0.0261 6.78,39 -999.2500 34.0000 10050.0000 -999.2500 0.0305 6.2755 ,999.2500 29.0000 10075.0000 -999.2500 -0.0005 7.0721 -999.2500 32.0000 10100.0000 -999.2500 0.0083 8.9310 -999.2500 -999.2500 10.6461 10.2510 32.9248 123.9250 -999.2500 -999.2500 19.9319 10.0591 27.2640 125.0375 -999.2500 15.4020 12.9335 66.8809 130.8500 -999.2500 -999.2500 16.8829 11.5174 108.3389 132.8000 -999.2500 -999.2500 16.4436 11.0163 110.9520 135.2375 -999.25(X) -999.2500 22.3482 11.8013 97.6621 136.6250 -999.2500 -999.2500 16.8576 13.6314 137.7966 2.5570 13.1722 10.2818 -999.2500 74.4118 2.2960 2.4481 21.3810 10.0104 -999.2500 50.3326 3.0121 18.4355 12.9222 -999.2500 81.8115 2.1640 2.7491 17.2211 11.5182 -999.2500 63.6932 2.2290 2.7842 16.1697 11.0060 -999.2500 63.8837 2.1150 3.1620 21.9969 11.8196 -999.2500 64.5655 2.0470 2.7285 17.0162 13.6178 -999.2500 28.3124 11.1342 -999.2500 -999.2500 -999.2500 24.1712 20.8457 -999.2500 -999.2500 -~.2~ 35.0748 16.1082 -999.2500 -999.2500 -999.2500 31.9514 17.6569 -999.2500 -999.2500 -999.2500 27.5666 17.1976 -999.2500 -999.2500 -999.25O0 34.6849 23.3728 -999.2500 -999.2500 -999.2500 39.1887 17.6304 -999.2500 -999.2500 25.7056 5.3290 -999.2500 2.0000 -999.2500 21.4138 5.1400 -999.2500 0.0000 -999.2~ 32.7137 7.9764 -999.2500 0.0000 -999.2500 29.4769 6.5780 -999.2500 3.0(XX) -999.2500 24.9326 6.0836 -999.2500 3.0000 -999.2500 32.3098 6.8583 -999.2500 0.0000 -999.2500 36.9774 8.6664 -999.2500 2.0(XX) 44.0(XX) 137.7500 61.6176 10125.0000 -999.2500 2.2090 -999.2500 -999.2500 -999.2500 -999.2500 3.3980 29.7680 27.2141 0.0440 16.8973 16.8044 17.6720 9.7768 10.0725 14.7538 14.9085 -999.2500 -999.2500 -999.2500 . 158.4011 -999.2500 -999.2500 3.0(X~ 72.0000 137.3(XX) 35.7754 10150.0000 0.0527 2.6080 15.8405 15.8405 34.0815 34.0793 4.0431 7.5227 4.1599 0.0844 106.8010 107.5966 111.6976 16.6383 17.1212 21.6626 20.7999 2.8491 63.1295 115.0000 138.4813 36.5976 10175.0000 0.1196 2.4800 31.6145 31.6145 3.2368 3.2371 3.5820 13.0011 9.8375 0.0719 39.4722 39.7285 41.2820 10.8572 11.1828 15.8445 15.8802 0.3624 31.6310 31.6310 53.6800 308.9445 308.9168 4.00~ 89.0000 139.7168 35.0548 10200.0000 0.4585 2.6650 112.3684 112.3684 116.8707 116.8566 4.4144 2.6957 -0.8427 0.0548 94.9928 94.3951 99.3480 13.9714 14.3823 18.9826 19.0237 7.1098 8.8993 8.8993 33.5928 8.5585 8.5575 3.00(X) 78.0000 141.7437 36.0762 10225.0(XX~ 0.1183 2.6250 31.3176 31.3176 28.3495 28.3479 4.1213 4.6746 1.2083 0.0592 96.0263 95.2503 100.4290 11.3616 11.7011 16.3535 16.3535 2.4588 31.9385 31.9385 32.2925 35.3969 35.3989 3.0(X~ 48.~ 144.1625 35.8890 10246.(XXX) 0.0259 2.1850 8.6818 8.8818 0.2940 0.2944 2.6078 30.7754 28.2582 0.0235 33.2993 33.2319 34.8260 10.4561 10.7706 15.4398 15.6305 0.0324 134.2955 134.2955 97.3851 3493.6162 3488.2983 3.0(XX) 27.0000 145.2875 35.5849 Tape File Start Depth = 9864.0(XXX~ Tape File End Depth = 10246.~ Tape Rle Level Spacing = 0.2500(~ Tape File Depth Units = Feet Tape Subtile 10 is type: US DEPTH ARCM CPAM CPCM DRHO GRAM NPLM NPHI RA ROP RPTM TCDM RHOB PEF GR NPSM RPAM WBCS CAAM DPLM GRCM PDCM RP CACM DPSM NPAM RAAM RPDM 10275.0000 -999,2500 2,0800 -999,25(X) -999.2500 -999.2500 -999.25(X) 3.9505 36,7691 34.4698 -0.0038 17.2995 17,1388 18,0927 12.2126 12.5755 17,2116 16.5196 -999,2500 -999.2500 -999.2500 210,4892 -999,2500 -999,2500 0,(:X:X:X) 777.7810 145,4000 33,7~ 10300,0000 -999,2500 2,0350 -999,2500 -999,2500 -999.25(X:) -999,2500 2,8772 39,8371 37,6494 -0.0627 21,5454 21.3173 22,5332 9,7653 10.0606 14.7422 15.0392 -999.2500 -999.2500 -999.2500 1 '16,3464 -999.2500 -9cJ9,2500 4,0(:X:)O 36.0000 138,9500 32.9078 10325.CX300 -999.2500 2,1640 -999.2500 -999.2500 10250.0000 0.0015 2.1690 1.0592 1.0592 -999.2500 -999.2500 2.4349 32.6406 30.1912 0.0516 33.6747 33.8125 35.2186 10.9963 11.3257 15.9850 16.0233 -999.2500 1006.1775 1006.1775 137.9207. -999,2500 -999.2500 0.00~ 772.0000 145.2875 36.3770 10246.2500 0.0268 2.1730 9,1513 9,1513 0.2877 0.2881 2.7457 30,6907 28.1704 0.0204 32,7542 32.0996 34.2559 10.4558 10.7703 15.4395 15.4809 0,0317 123,9290 123.9290 90.8540 354 1.1235 3535.6890 3.0(X)O 26.0(0X) 145,2875 35.2139 10246.0000 0.0259 2.1850 8.8818 8.8818 0.2940 0.2944 2.6078 30.7754 28.2582 0.0235 33.2993 33.2319 34.8260 10.4561 iu./~uo i5,4398 15.6305 · .0,0324 I34,2955 134.2955 97.3851 3493.6162 3488.2983 3.(X3(X) 27.0000 145.2875 35.5849 -999.2500 0.03213 9.3O28 -999.2500 38.0000 1O350.0000 -999.2500 0.0424 9.8531 -999.2500 37.0000 10375.0000 0.1480 -0.0375 12.0903 -999.2500 33.0000 10400.(ZX)O 0.3693 0.0678 12. 2998 -999.2500 44.0000 10425.0000 -999.2500 0.0740 14.8653 -999.2500 33.0000 10450.0000 5.6446 0.0184 16.5744 -999.2500 32.0000 10475.0000 -999.2500 0.0327 16.0821 -999.2500 -999.2500 17.5579 13.9971 129.6535 138.6500 -999.2500 -999.2500 17.8890 14.5382 84.4777 137.0750 -999.2500' 0.1485 37.7228 16.7356 105.8507 137.1875 -999.25(X) 0.3697 31.7045 16.9411 97.0663 137.8625 -999.2500 -999.2500 31.3008 19.4556 113.4835 137.7125 -999.2500 5.6~.~.8 68.9282 21.1278 50.8245 138.0875 -999.2500 -999.2500 19.2778 20.6465 96.6329 17.1350 14.3360 -999.2500 51.7179 2.1600 2.3267 15.8,947 14.4998 -999.2500 47.9880 2.1920 2.5202 37.8846 16.2656 6755.6943 48.8152 2.2090 3.1226 31.0074 16.9251 2966.3662 52.7005 2.2370 3.4236 31.9836 19.4280 -999.2500 49.8429 2.3300 2.3531 66.9838 21.1388 177.1599 49.5722 2.1570 1.7708 19.5376 20.8102 -999.2500 32.3300 18.3629 -999.250O -999.25O0 -999.2500 32.2421 18.7092 -999.2500 -999.2500 -999.2500 3O.0319 39.4523 0.0143 6738.OO39 -999.2500 30.6446 33.1581 0.0417 2961.8486 -999.2500 27.2342 32.7359 -999.2500 -999.2500 -999.2500 21.7825 72.0884 0.6092 177.1552 -999.2500 32.6752 20.1617 -999.2500 -999.2500 · . 29.8693 9.0280 -999.2500 3.(:X:X:X) -999.2500 29.7782 9.5634 -999.2500 3.00(X) -999.2500 27.4876 11.7404 -999.2500 3.0(X30 -999.2500 28.1226 11.9443 -999.2500 4.0000 -999.2500 24.5882 14,4416 -999.2500 4.0000 -999.2500 18.9382 16.1056 -999.2500 3.0(X~ -999.2500 30.2271 15.6264 -999.2500 4.00(30 27.0000 138.8750 50.4746 10500.001XI -999.2500 2.1410 -999.2500 -999.2500 -999.2500 -999.2500 2.4048 33.4453 31.0252 0.0868 15.4,949 15.6217 16.2053 15.6620 16.1186 20.6823 20.7168 -999.2500 -999.25(X) -999.2500 113.2362 -999.2500 -999.2500 3.0000 28.0000 139.3250 51.6778 10525.0(300 -999.2500 2.1480 -999.2500 -999.2500 -999.2500 -999.2500 2.3207 32.8113 30.3681 0.0678 19.3628 19.1297 20.2505 16.5130 16.9925 .. 21,5367 21,2899 -999,25(X) -999,2500 -999.2500 108,6475 -999,2500 -999.2500 4.0000 41.0000 141.0969 51,6176 10550.0000 -999.2500 2.2240 -999.2500 0.9264 0.9268 1.8716 29.5450 0,059R 25.3014 25.1689 26.4614 14.4423 19.0414 19.0309 0.1085 -999.2500 91.8596 1077.0823 1076.6077 51.0(XX) 141.5750 50.7954 -999.2500 26.9830 14.0298 -999.250O 4.0000 10575.0000 -999.2500 2.3740 -999.2500 6.0337 6.0338 2.5526 19.6713 0.0409 46.1935 45.4224 48.3114 11.1982 15.8598 15.8860 0.6481 -999.25(X) 41.6401 165.7354 165.7319 43.0(X)0 141.7812 48.8703 -999.2500 16.7503 10.8722 -999.2500 3.~ 10600.0000 -999.2500 2.3640 -999.2500 1.6088 1.6092 3.0382 20.0328 0.0355 33.7716 34.4928 35.3200 11.8083 16.4588 16.4865 0.1865 -999.2500 120.0724 622.0164 621.8696 37.(X3~ 143.5156 50.9559 -999,2500 17.1249 11.4660 -999,2500 3,0000 10625.(ZX:X:I -999.2500 2.3880 -999.2500 0.3268 0.3273 3.6921 18.1499 0.0092 28.7937 26.7892 30.1138 12.1573 16.8013 16.8273 0.0364 -999.2500 42.6635 3059.6162 3055.6162 42.00(30 145.6812 48.3088 -999.2500 15.1735 11.8056 -999.2500 3.0000 10650.0000 -999.2500 2.4630 · 0.2235 0.2239 2.2024 -999.2500 19.2514 -999.2500 16.3151 0.1141 14.2473 -999.25OO 45.0(XX) 10675.0000 0.1155 0.0040 14.9997 -999.2500 32.00~ 10700.0000 -999.2500 0.0771 15.2797 -999.2500 31.00~ 10725.~ -999.2500 0.0379 14.3882 -999.2500 33.0000 10750.0000 -999.2500 0.0679 14.2802 -999.2500 47.8890 10775.0000 -999.2500 -0.1191 14.8190 -999.2500 29.0000 10800.0000 -999.2500 0.0622 17.2776 -999.2500 31.0000 25.2045 18.8504 66.8174 146.9750 . -999.2500 0.1159 20.0368 19.5872 85.1294 146.1875 -999.2500 -999.2500 18.3412 19.8614 108.5295 146.1125 -999.25(X) -999.2500 40.5542 18.9884 103.9921 145.5125 -999.2500 -999.2500 40.3120 18.8826 94.5466 146.6825 -999.2500 -999.2500 26.8437 19.4104 109.5905 146.6375 -999.2500 -999.2500 19.6350 21.8145 117.3031 147.6500 25.5985 18.6,3,.99 6205.3135 52.6454 2.2130 2.9414 20.0910 19.4775 8658.8516 47.0856 2.1650 2. i130 19.6091 19.8565 -999.25O0 50.9208 2.1860 2.2884 40.2943 19.1169 -999.2500 46.0348 2.2190 2.5696 38.5622 19.7945 -999.2500 48.9204 2.0410 3.2700 25.9763 19.4591 -999.2500 46.0628 2.2650 3.2641 20.1200 21.8388 -999.2500 44.8847 26.3601 0.0236 6185.7676 -999.2500 28.9332 20.9555 0.0102 8627.2658 -999.2500 32.1059 19.1821 -999.2500 -999.2500 -999.2500 30.6343 42.4136 -999.2500 -999.2500 -999.2500 28.5983 42.1602 -999.2500 -999.2500 -999.2500 38.4549 28.0744 -999.2500 -999.2500 -999.2500 27.7732 20.7443 -999.2500 -999.2500 13.8399 -999.2500 3.0(X~ -999.2500 26.3489 14.5724 -999.2500 3.00(30 -999.2500 29.6370 14.8451 -999.2500 2.0(X)O -999.2500 28.1119 13.9771 -999.2500 3.0000 -999.2500 26.0019 13.8720 -999.2500 O.O(X:X) -999.2500 36.2169 14.3965 -999.2500 3.0000 -999.2500 25.1467 16.7908 -999.2500 4.0000 10825.0000 -999.2500 2.2090 -999.2500 -999.2500 -999.2500 -999.2500 2.3131 29.1750 26.5995 0.1253 21.7405 22.2985 22.7373 15.2516 15.6971 20.2694 20.2590 -999.2500 -999.2500 -999.2500 63.6921 -999.2500 -999.2500 0.0000 33.0920 147.8750 48.0882 · 10850.0(XX) -999.2500 2.2160 -999.2500 -999.2500 -999.2500 -999.25(X) 1.7869 30.8144 28.2986 0.0830 23.6946 22.9735 24.7809 13.9926 14.4041 19.0037 18.9815 -999.2500 -999.2500 -999.2500 74.2103 -999.2500 -999.2500 0.0000 30.2000 147.6500 41.7313 10875.0000 -999.2500 0.0196 · 13.0236 -999.2500 44.0000 -999.2500 2.2160 -999.2500 -999.2500 -999.2500 2.3761 30.5756 28.0511 20.0449 23.1306 20.9639 12.6488 17.6510 17.6614 -999.2500 -999.2500 71.1926 -999.2500 -999.2500 4. O(X)O 148.1000 45.6467 10900.00(X) -999.2500 2.2070 -999.2500 -999.2500 -999.25(X) -999.2500 2.08 14 29.6730 27.11 56 O. 1092 26.3430 26.4744 27.5508 13.4609 13.8579 18.4689 19.5712 -999.2500 -999.2500 -999.2500 110.0430 -999.2500 -999.2500 4.0(X30 32.0000 149.0(XX) 46.2483 10925.0000 -999.2500 2.1940 -999.2500 -999.2500 -999.2500 -999.2500 4.2965 28.3962 25.7924 -0.1115 41.7896 39.8162 43.7056 15.1173 15.5593 20.1347 20.1744 -999.2500 -999.2500 -999.2500 82.5585 -999.2500 -999.2500 4.0(XX) 41.0000 149.6750 46.3636 10950.0000 -999.2500 2.2170 -999.2500 -999.2500 -999.2500 -999.2500 1.5196 28.5931 25.9965 0.0437' 56.3766 65.1045 69.4198 15.7332 16.1918 20.7527 20.7370 -999.2500 -999.2500 -999.2500 51.4981 -999.2500 -999.2500 0.0000 37.58,90 149.6750 45.4612 10975.0000 -999.2500 2.1610 -999.2500 -999.2500 -999.2500 -999.2500 1.8723 32.6115 30.1610 0.0107 31.4340 32.6093 32.8752 14.8975 15.3335 19.9139 19.9290 -999.2500 -999.2500 11(X)0.~ -999.2500 0.0726 14.8019 -999.2500 33.0000 11025.0(X:X) -999.2500 0.0140 16.3691 -999.2500 35.1500 11050.0000 -999.2500 0.0188 14.3059 -999.2500 28.0000 11075.0000 -999.2500 0.0712 14.5692 -999.2500 26.0000 11100.(:X:X30 -999.2500 0.0701 14.8595 -999.2500 40.00O0 11125.(XXX) -999.2500 0.0756 15.4574 -999.2500 31.0000 11150.0000 83.6332 151.4750 19.3936 105.2132 152.6(XX) -999.2500 -999.2500 67.0226 20.9272 108.9202 152.6000 -999.2500 -999.25(X) 48.4511 18.9078 111.4063 152.3750 -999.2500 -999.2500 33.2710 19.1657 128.7617 · 152.4312 -999.2500 -999.2500 31.7207 19.4500 138.5496 153.2750 -999.2500 -999.2500 22.0958 20.0353 118.0983 153.5000 -999.2500 36.1644 2.2800 2.1136 36.6155 19.2864 -999.2500 41.8917 2.2670 1.8148 69.2908 20.9250 -999.25(X) 45.3409 2.1640 0.7698 46.7158 18,9200 -999.2500 44.1818 2.1690 2.2003 32.9474 19.1707 -999.2500 46.2884 2.1830 2.0034 32.3155 19.4785 -999.2500 44.0959 2.1830 1.4382 23.8937 20.(:X388 -999.25(:X) 49.8630 2.2040 25.5311 38.4783 -999.2500 -999.2500 -999.2500 28.3780 70.0954 -999.2500 -999.2500 -999,2500 32.2448 50.6725 -999.2500 -999.2500 -999.2500 31.6667 34.7964 -999.2500 -999.2500 -999.2500 30.9620 33.1750 -999.2500 -999.2500 -999.2500 30.7361 23.1089 -999.2500 -999.2500 -999.2500 22.8231 14.3798 -999.2500 3.(X:X30 -999.2500 25.7736 15.9059 -999.2500 O.O(X~ -999.2500 29.7810 13.8970 -999.2500 3.0000 -999.25(X3 29.1818 14.1533 -999.2500 3.(:X)(X) -999.2500 28.4516 14.4359 -999.2500 3.0000 -999.2500 28.2174 15.0181 -999.2500 3.0000 -999.2500 -999.2500 1.6485 0.0778 28.4101 29.4717 14.4211 19.0206 18.9969 -999.2500 121.7794 -999.2500 26.(XXX} 152.3750 46.7346 29.7293 29.7127 -999.2500 -999.2500 27.1740 14.0091 -999.2500 3.0000 · 11175.0(X~ -999.2500 2.2380 -999.2500 -999.2500 -999.2500 -999.2500 2.3929 27.5923 24.9593 0.1015 32.7663 32.0660 34.2686 16.6542 17.1371 21.6758 21.4384 -999.2500 -999.2500 -999.2500 139.1578 -999.2500 -999.2500 4.0000 32.0000 152.9937 44.4786 ~ 3 ~ ~z.~ -~.Z~ 2.2500 -~.2500 -999.2500 -999.2500 -999,2500 3.9532 26.8910 24.2325 -0.1328 33.4302 33,1040 34.9629 15.4092 15.8590 20.4282 20.3053 -999.2500 -999.2500 -999.2500 138.6435 -999.2500 -999.2500 3.(XXX) 36°0000 153.50(X) 45.4061 Tape File Start Depth = 10246.000000 Tape File End Depth = 11192.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 11 is type: LIS DEPTH ARCM CPAM CPCM DRHO GRAM NPLM NPHI RA ROP RPTM TCDM RHOB PEF GR NPSM RPAM WBCS CAAM DPLM GRCM PDCM RP CACM DPSM NPAM RAAM RPDM 11192.0000 -999.2500 2.2500 -999.2500 -999.2500 -999.2500 -999.2500 3.9532 26.8910 24.2325 -0.1328 33.4302 33.1040 34.9629 15.4092 1~5.~,5~K) 20.4282 ' 20.3053 ' -999.25(X) -999.2500 -999.2500 138.6435 -999.2500 -999.2500 3.0000 36.0000 153.5000 45.4061 11 i 92.2500 -999.2500 2.2490 -999.2500 -999.2500 -999.2500 -999.2500 3.8925 26.9208 24.2634 -0.1209 34.0464 32.7525 35.6074 15.2243 15.6692 20.2423 20.4565 -999.2500 -999.25(X) -999.2500 160.1671 -999.2500 -999.2500 3.0000 36.0(X~ 153.5000 45.3810 11200.0000 -999.2500 2.2(X)0 -999.2500 2.7827 2.7830 1.8361 29.7688 0.0834 32.3052 30.6489 33.7864 16.0167 20.5825 20,5821 0.3155 -999.2500 162.0172 359.5474 359.5062 862.0000 153.2750 46.1330 11225.0000 -999.2500 2.4160 -999.2500 1.5491 1.5495 4.6277 17.33,90 -0.0228 39.3201 37.0204 41.1228 15.1967 19.7801 19.8543 0.1799 -999.2500 88.7617 645.5471 645.3881 884.9310 153.9500 47.3663 -999.2500 27.2150 15.5627 -999.2500 7.0000 -999.2500 14.3,.332 14.7642 -999.250O 0.0000 11250.0(X)0 -999.2500 2.2710 -999.2500 -999.2500 1.7011 1.7010 2.2332 25.5538 22.8466 0.0775 91.3904 88.3769 95.5804 17.3555 17.8576 22.3821 22.1537 0.1902 -999.25(X) -999.2500 31.0290 810.1101 809.8,3,33 0.0000 80.7490 144.0500 70.9645 2.2740 11275.0000 -999.2500 2.5462 0.0421 15.5954 -999.2500 77.0(X30 11300.0000 2.9079 0.0336 13.9087 -999.2500 50.O0(X) 2.5466 59.9519 20.1701 47.8132 142.6437 -999.2500 2.9082 57.0327 18.5186 28.6518 142.9250 2.1272 58.4014 20.1422 392.7359 34.8032 2.3190 2.2250 58.5057 18.7803 343.8915 39.8185 25.5075 62.7005 0.2902 392.6848 -999.2500 22.8417 59.6475 0.3293 343.8546 22.7986 15.1526 -999.2500 6.0000 -999.2500 20.0359 13.5103 -999.2500 8.0000 11325.0000 2.8715 -0.0085 17.1571 -999.2500 47.0530 -999.250O 2.8718 62.3744 21.6'973 55.2750 145.2875 2.2560 3.1209 62.9206 20.9311 348.2463 36.4581 -999.2500 26.5324 65.2342 0.3253 348.2083 23.8608 16.6733 -999.2500 0.0000 11350.0(X~ 5.6714 0.0634 16.4264 -999.2500 114.0000 -999.2500 5.6716 38.2539 20.98,33 63.0192 145.5125 2.2140 1.5520 40.1573 21.1345 176.3230 50.0742 28.9850 40.0077 0.6123 176.3183 -999.2500 26.4026 15.9617 -999.2500 9.0000 11375.0000 35.0420 -0.0921 20.5259 -999.2500 160.6670 -999.2500 35.0397 112.1053 24.9856 14.6604 148.5500 1.8380 7.3202 112.1634 25.2044 28.5572 43.6000 -999.2500 51.0147 117.2451 2.9140 28.5591 -999.2,500 49.2335 19.9550 -999.2500 8.0000 11400.0000 4.9112 -0.0453 14.0364 -999.2500 101.0000 -999.2500 4.9114 ' 98.9954 18.6438 15.5250 151.5875 2.5970 5.6532 101.2670 18.5129 203.6176 47.2532 -999.2500 6.6175 101.4425 0.5368 203.6095 -999.2500 3.2218 13.6347 -999.2500 11425.0000 19.4157 -0.0912 8.0434 636.1267 0.0028 19.4148 58.1306 12.7579 24.6411 2.5800 4.9920 61.7115 12.7931 51.5048 1.6635 7.1144 60.7958 1.8018 51.5071 1.6635 3.7368 7.8030 636.1267 9.0000 100.2500 11450.(XXX3 63.4102 0.0661 12.0936 31.0210 110.5000 11475.0000 46.3722 -0.0239 12.1661 4,S.3829 139.0000 11500.0000 38.7554 0.0350 13.0717 231.8941 108.8920 11525.0000 7.6616 0.0091 12.4438 -999.2500 68.0000 11550.00(X) 8.1006 0.0887 11.6544 -999.2500 63.0000 575.0(XX) 12.5469 0.0627 13.5219 -999.2500 66.3330 11600.00~ 10.0410 152.6000 0.1223 63.4045 104.9097 ;16.7387 26.5147 154.4000 0.0727 46.3686 99.4556 16.8098 19.7115 155.5250 0.0103 38.7527 135.4484 17.6979 17.8527 156.2000 -999.2500 7.6616 88.7822 17.0824 22.0271 155.6750. -999.2500 8.1006 71.4077 16.3076 72.1195 156.6750 -999.25(X) 12.5466 63.2422 18.1395 58.7708 158.00(X) -999.2500 10.0408 43.6464 2.5340 2.5171 104.21-57 16.1420 15.7703 47.8387 2.5400 3.7271 101.2656 16.6216 2I .5647 47.7226 2.5600 2.1214 129.8235 17.6429 25.8029 46.5935 2.4500 2.3295 91.9907 16.4942 130.5210 49.3561 2.3850 2.3960 67.6822 16.5717 123.4481 47.8968 2.3410 2.2967 63.2179 18.0048 79.7011 49.9561 2.3750 2.6108 32.2362 10.3168 109.7195 4.5915 15.7717 20.6685 10.0947 104.0155 3.6257 21.5663 4.3123 8.9046 141.6584 3.1546 25.8047 -999.2500 15.3394 92.8527 0.80,39 130.5206 -999.2500 18.9115 74.6816 0.8451 123.~.~.82 -999.2500 21.4976 68.1417 1.2421 79.7032 -999.2500 19.5731 32.2362 7.0577 11.7436 31.0210 8.0000 20.6685 6.8254 11.8142 48.3829 0.0000 4.3123 5.5920 12.6956 231.8941 O.O(XX) -999.2500 12.2609 12.0844 -999.2500 9.0000 -999.2500 15.9628 11.3162 -999.2500 7.0(XX3 -999.2500 18.6430 13.1338 -999.25(X) 8.3,3,,30 -999.2500 16.6484 -0.0398 11.1284 -999.2500 82.7500 11625.0000 4.9600 -0.1595 11.3069 -999.2500 65.3330 11650.0000 3.4174 -0.0438 12.38,39 -999.2500 48.1330 11675.0000 1.7628 0.0337 16.2883 -999.2500 68.0000 11700.0000 1.7789 -0.0273 13.1858 -999.2500 61.0000 11725.0000 1.5887 0.0676 15.6118 -999.2500 42.33~ 11750.0(XX) 5.0976 0.1020 15.5635 -999.2500 46.0000 62.2741 15.7893 49.4719 158.5625 -999.2500 4.9602 53.4314 15.9666 29.2890 157.8875 -999.2500 3.4177 24.6011 17.0236 29.7459 158.3750 -999.2500 1.7632 26.4368 20.8482 65.6055 159.3500 -999.2500 1.7792 38.9510" 17.8101 50.1818 159.8(X)0 -999.2500 1.58,90 52.4580 20.1864 69.5632 156.9875 -999,25(X) 5.0977 34.1109 20.1383 69.4308 158.9000 61.7491 15.7925 99.5921 51.2355 .. 2.4430 4.8811 54.2169 15.9040 201.6141 50.2484 2.6930 6.1641 25.1802 16.9350 292.6178 49.6097 2.1900 2.6,331 28.0144 20.8571 567.2809 49.6532 2.2830 3.1750 42.8918 17.7645 562.1591 51.7581 2.2090 1.5971 52.3150 20.2218 629.4575 53.1322 2.2010 1.5687 35.3511 20.1724 196.6993 56.3234 65.1 293 1.0220 99.5934 -999.2500 15.6356 55.8811 0.5413 201 .~ -999.2500 0.9802 25.7290 0.3832 292.5935 -999.2500 30.4202 27.6489 0.20,39 567.1613 -999.2500 24.9490 40.7369 0.2058 562.0417 -999.2500 29.3127 54.8630 0.1838 629.3074 -999.2500 29.9897 35.6748 0.5554 198.6921 10.8023 -999.2500 8.0000 -999.2500 12.5678 10.9780 -999.2500 8.(XX)O -999.2500 -2.6205 12.0261 -999.2500 0.0000 -999.2500 27.8900 15.8272 -999.2500 O.O(XX) -999.2500 22.2198 12.8066 -999.2500 6.00(X) -999.2500 26.7423 15.1685 -999.2500 8.00(X) -999.2500 27.4439 15.1215 -999.2500 6.0000 11775.0000 4.9689 0.0832 15.5068 -999.2500 117.5000 11800.00(~ 5.6193 -0.0505 19.5829 -999.2500 95.1690. 11825.0000 8.1858 -0.1108 10.8586 -999.2500 41.0000 1185O.OO00 5.O257 0.0545 13.8310 -999.2500 44.0000 11875.0000 4.O683 0.0443 14.5462 -999.25O0 49.O0O0 119OO.O000 2.7526 0.0875 12.9139 -999.2500 66.3330 11925.0000 7.6797 0.0068 11.8629 -999.2500 4.9691 143.3532 20.0837 115.7165 159.3500 -999.2500 5.6194 122.1668 24.0847 12.7081 16!.1500 · -999.2500 8.1858 38.8615 15.5263 73.1698 161.6(X)O -999.2500 5.0259 52.1675 18.4424 58.6765 161.3750 -999.2500 4.0685 50.9637 19.1427 55.6907 161.6(XX) -999.2500 2.7529 54.1737 17.5435 55.7294 162.0500 -999.2500 7.6798 61.6973 16.5122 2.2450 1.7542 125.2493 19.6813. 201.2510 55.9871 2.4,.3,30 5.4100 121.1867 24.2871 177.9580 55.44§3 2.2260 3.6351 38.4979 16.0462 122.1630 52.4258 2.2080 1.5236 50.7594 18.5495 198.9760 54.0516 2.2680 1.0386 51.7740 19.08,.39 245.8055 53.9500 2.3130 1.4049 55.8799 17.8105 363.2943 56.4613 2.3430 1.7494 67.8846 16.3309 -999.2500 27.1667 149.9256 0.5425 201.2432 -999.2500 17.4609 127.7679 0.58,90 177.9536 -999.2500 25.8741 40.6432 0.8530 122.1632 -999.25O0 29.0438 54.5592 0.5484 198.9685 -999.2500 25.9468 53.3003 0.4510 245.7906 -999.2500 23.2102 56.6575 0.3120 363.2520 -999.2500 21.4440 64.5260 0.8055 -999.2500 24.5182 15.0662 -999.2500 9.0(ZX) -999.2500 14.4595 19.0365 -999.2500 0.0000 -999.250O 23.1786 10.5418 -999.2500 8.0000 -999.2500 26.4636 13.4347 -999.2500 6.0000 -999.2500 23.2540 14.1310 -999.2500 8.0000 -999.2500 20.4178 12.5420 -999.2500 6.6670 -999.2500 18.5874 11.5190 -999.2500 -999.2500 83.1626 130.2129 47.0000 162.5(X:)0 55.1621 130.2125 11950.(:X:I(X)-999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999,2500 -999,2500 -999.2500 -999.2500 52.2469 52.4064 54.6423 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 71.8268 -999.2500 -999.2500 7.0(XX) 87.3330 162.2750 57.0419 11963.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -9"J9.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 48.6637 -999.2500 -999.2500 7.0(XX) 103.00~ 162.9500 53.2968 Tape File Start Depth = 11192.~ Tape File End Depth = 11963.(XX)000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subfile 12 is type: US DEPTH ARCM CPAM CPCM DRHO GRAM NPLM NPHI RA ROP WBCS TCDA RHOB PEF GR NPSM RPAM WBCM CAAM CACM DPLM DPSM GRCM NPAM PDCM RAAM RP TCDM 10227.0000 -999.2500 2.4070 -999.2500 -999.2500 -999.2500 -999.2500 5.8922 18.6948 15.7383 0.0640 -999.2500 -999.2500 -999.2500 14.0487 14.4617 19.0603 18.9329 -999.25(X) -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 143.4875 38.4158 10227.2500 -999.2500 -2.3710 -999.2500 -999.2500 -999.2500 -999.2500 5.8575 17.7186 14.7265 0.0654 -999.2500 -999.2500 -999.2500 13.9513 14.3617 18.9624 19.3414 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.25(X) -999.2500 -999.2500 143.54,,38 37.6069 10250.0000 -999.2500 2.2660 -999.2500 -999.2500 1.1219 1.1223 8.0471 25.4784 22.7685 0.2560 59.4653 56.8229 62.1917 10.9620 11.2904 15.9501 15.9207 0.1310 -999.2500 -999.2500 -999.2500 891.3722 891.0536 -999.2500 -999.2500 145.2875 36.3770 10275.0000 -999.2500 2.0570 -999.2500 -999.2500 5.6312 5.6314 3.4500 38.0524 35.7997 0.0038 28.68.39 27.99(X) 29.9990 11.1951 11.5300 16.1856 16.1246 0.5685 -999.2500 -999.2500 -999.2500 474.6963 474.5079 -999.2500 -999.25(X) 145.4(X)0 33.7299 10300.(:XXX) -999.2500 2.0290 -999.2500 -999.25(X) 0.8601 0.8605 1.9563 39.9112 37.7261 0.0235 23.0094 23.4644 24.0644 8.2253 8.4776 13.1853 13.2324 0.1006 -999.2500 -999.2500 77.8068 1162.6831 1162.1260 158.3938 0.0000 138.9500 32.9078 10325.0000 -999.2500 2.1380 -999.2500 -999.2500 3.3336 0.0573 -999.2500 0.0000 1O350.0000 1.2667 0.0241 9.6339 -999.2500 0.0000 10375.0000 2.1007 0.0378 - 13.5303 -999.2500 O.O0(X) 3.3338 20.7607 14.1408 85.5512 138.6500 -999.2500 1.2671 18.5580 14.3227 115.9364 137.0750 -999.2500 2.1010 33.4254 18.1478 92.5535 137.1875 2.5332 21.1319 14.1175 299.9800 51.7179 2.0760 2.6234 18.9299 14.2186 789.4761 47.9880 2.1840 3.0416 33.0212 18.1546 482.5886 48.8152 34.0580 21.7126 0.3744 299.9540 -999.2500 37.0711 19.4088 0.1477 789.2299 -999.2500 29.9106 34.9579 0.2415 482.5042 31.6601 9.1702 -999.2500 151.2500 -999.2500 34.7827 9.3501 -999.25(X) 148.1000 -999.25(X) 27.3619 13.1420 -999.2500 148.1000 10400.0000 4.0894 0.0126 15.5815 -999.2500 0.0000 -999.2500 4.0897 37.7285 20.1567 56.5034 137.8625 2.2020 3.2735 37.7912 19.9572 245.5688 52.7005 -999.2500 29.7342 39.4582 0.4532 245.5538 -999.2500 27.1791 15.1389 -999.2500 147.4250 1O425.0000 1.6598 0.0461 14.1688 -999.2500 O.O(X)O -999.2500 1.6602 27.1641 18.7735 104.0174 137.7125 2.2040 2.6780 27.7124 19.0059 602.4690 49.6429 -999.2500 29.5715 28.4095 0.1925 602.3323 -999.2500 27.0105 13.7635 -999.2500 147.0875 10450.0(X:)0 1.7147 -0.0736 13.7371 -999.2500 0.O(XX) -999.2500 1.7151 38.1903 18.3505 104.0766 138.0875 2.0760 2.7458 36.1112 18.7818 583.1895 49.5722 -999.2500 37.0610 39.9413 0.1987 583.0623 -999.2500 34.7723 13.3432 -999.2500 146.6656 10475.0000 1.7466 0.0680 18.2228 -999.2500 -999.2500 1.7469 26.7378 22.7388 97.3781 2.1520 2.0875 27.6819 22.6487 572.5504 -999.2500 32.6372 27.9637 0.2023 572.4283. -999.25(X) 30.1876 17.7112 -999.2500 146.5250 0.0000 138.8750 50.4746 10500.(XX~ -999.2500 2.1700 1.8219 1.8223 2.2711 0.0805 28.1278 27.5621 15.9328 .20.5005 20.9517 -999.2500 87.3072 548.8688 0.00(30 139.3250 51.6778 -999.2500 32.0405 29.4175 0.2104 548.7577 -999.2500 29.5692 15.4810 -999.2500 146.9750 10525.0000 -999. 2500 2.1340 -999.2500 -999.2500 1.3891 1.3894 2.0758 33.7028 31.2919 0.0504 24.5058 24.7261 25.6293 18.1995 18.7240 23~81 ~R_~R74 0~161R · -999.2500 109.5516 719.9115 719.7096 147.0875 O. 0000 141.0969 51.6176 10550.0000 -999.2500 2.2110 -999.2500 -999.2500 2.6334 2.6,337 2.0868 29.2713 26.6993 0.0755 21.8057 25.9430 22.8054 16.2273 16.6992 21.2499 21.2178 0.2998 -999.2500 -999.25(X) 109.3203 379.7365 379.6893 147.2000 0.0000 141.5750 50.7954 10572.0000 -999.2500 -999.2500 -999.2500 -999.2500 9.0321 9.0321 -999.2500 -999.2500 -999.2500 -999.2500 47.7035 50.6838 49.8906 -999.2500 -999.2500 -999.2500 -999.2500 0.9310 -999.25(X) -999.2500 67.9299 110.7158 110.7166 146.9750 0.0000 141.7625 50.0200 Tape File Start Depth = 10227.000000 Tape File End Depth = 10572.(XX)000 Tape File Level Spacing = 0.250(Z)0 Tape File Depth Units = Feet Tape Subtile 13 is type: LIS ·