Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout191-117Digitally signed by Sean
McLaughlin (4311)
DN: cn=Sean McLaughlin (4311)
Date: 2025.09.23 16:22:43 -
08'00'
Sean
McLaughlin
(4311)
By Gavin Gluyas at 8:09 am, Sep 24, 2025
RBDMS JSB 092525
J.Lau 11/5/25
ACTIVITYDATE SUMMARY
11/8/2024
***WELL FLOWING ON ARRIVAL***
BRUSHED 4-1/2 TUBING w/4-1/2''BLB & 3.70'' G-RING
DRIFTED TO HEX PLUG @ 10340'MD w/20' x 3.70'' DMY WHIPSTOCK DRIFT
T-BIRD LOADED IA 168 BBLS CRUDE, TBG 186 BBLS CRUDE
SET 3.81'' PX-PLUG BODY @ 9665' MD
***WSR CONT ON 11-9-24***
11/8/2024
T/I/O=1925/400/0 (Assist slickline W/Load) Pumped 168 bbls of crude down the IA to
load to SO valve. Reached fluid at 120 bbls, reduced rate to 1BPM for final 48 bbls.
Pumped 1 bbl of 60/40 followed by 118 bbls of crude followed by 67 bbls of DSL to
load TBG for a total volume of 186 bbls down the TBG. Standby for SL to set
plug/swap valves. *Job continues to 11-9-24*
11/9/2024
*Job continues from 11-8-24* (Assist Slickline W/MIT) Pumped 12 bbls of DSL down
the TBG to pressure up to 1500 psi to test that the prong is set in plug body for MIT
tests. Pumped 25 bbls of DSL down the TBG w/ communication into IA for an CMIT-
TxIA. Reached test pressure at 2755 psi TBG and 2719 psi IA. First 15 minutes TBG
lost 33 psi, IA lost 26 psi. Second 15 minutes TBG lost 6 psi, IA lost 9 psi. ***CMIT-
TxIA passed***. Bled back 6 bbls of DSL to bring both strings to 200 psi, Pumped 2
bbls DSL down TBG for ***MIT-T*** Reached test pressure at 2768, TBG lost 92 psi
in first 15 minutes, Second 15 minutes TBG lost 30 psi Resulting in a ***PASSING***
MIT-T
11/9/2024
***WSR CONT FROM 11-8-24***
SET 4-1/2" BAIT SUB (BS#37) 2-1/2" JD (gutted)(37") P-PRONG (84") (lih121") @
9665' MD
PULLED ST#4 BK-OGLV FROM 5340' MD
PULLED ST#5 BK-LGLV FROM 3092' MD
SET ST#5 BK-DGLV @ 3092' MD
T-BIRD PERFORMED PASSING CMIT-TxIA (see t-bird log)
SET ST#4 BK-DGLV @ 5340'MD
T-BIRD PERFORMED PASSING MIT-T
PULLED B-SUB w/P-PRONG FROM PLUG BODY @ 9665'MD
PULLED PX-PLUG FROM X-NIP @ 9665'MD
LOGGED w/READ 40 ARM CALLIPER FROM 10340'MD TO SURFACE (good data)
***JOB COMPLETE, WELL LEFT S/I***
11/10/2024
*** WELL SI ON ARRIVAL*** (WELLTEC MILL, JEWELRY GR LOG)
PT LOW 300 AND 2500 PSI HIGH.
LOG CORRELATED TO HALLIBURTON PLUG SETTING RECORD DATED 13-
AUG-2022
RIH WITH WELLTEC STROKER AND MILL TOOL, MILL XN NIP AT 9755'. DRY
DRIFT THROUGH XN NIPPLE TO 9762'. (Mill o.d. 3.8025" pre-run, 3.8020" post-
run)
RIH WITH GUN GAMMA AND PULL JEWELRY LOG WITH GR FROM 10290-9400'
LAY DOWN FOR THE NIGHT.
*** JOB CONTINUED ON 11-NOV-2024***
Daily Report of Well Operations
PBU F-40
Daily Report of Well Operations
PBU F-40
11/11/2024
***JOB CONTINUED FROM 10-NOV-2024***(WHIPSTOCK)
PT TO 200 LOW AND 2500 PSI HIGH.
LOG CORRELATED TO AK ELINE JEWELRY LOG DATED 10NOV24
RIH WITH BAKER DELTA WHIPSTOCK 4.5"x5.5", 13.5' CCL TO TOWS, OAL = 18'.
LOG TOOLS INTO PLACE @ 10168' MD.
MOTOR SAFETY PIN SHEARS WHEN TRYING TO ORIENTATE TOOL.
***JOB CONTINUED ON12-NOV-24***
11/12/2024
***JOB CONTINUED FROM 11-NOV-24*** (WHIPSTOCK SETTING)
PT 300LOW AND 2500 PSI HIGH.
LOG CORRELATED TO AK ELINE JEWELRY LOG DATED 10NOV2024. JEWELRY
LOG CORRELATED TO HALLIBURTON PLUG SETTING RECORD DATED13-AUG-
2022.
RIH WITH BAKER DELTA WHIPSTOCK 4.5"x5.5"
SET TOWS AT 10168 FT AND 176.2 DEG ROHS
WELL LEFT SI ON DEPARTURE.
*** JOB COMPLETED.***
Nolan Vlahovich Hilcorp Alaska, LLC
Geotech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 1/07/2025
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20240107
Well API #PTD #Log Date Log
Company Log Type AOGCC
Eset #
END 2-72 50029237810000 224016 11/16/2024 HALLIBURTON TEMP
END 2-74 50029237850000 224024 12/5/2024 HALLIBURTON MFC24
END 2-74 50029237850000 224024 8/13/2024 DarkVision HADES (Down hole camera)
KGSF 1A 50133101600100 220063 12/5/2024 HALLIBURTON EPX-MFC40
MPU F-13 50029225490000 195027 12/22/2024 HALLIBURTON WFL-TMD3D
PU F-40 50029222150000 191117 11/9/2024 READ CaliperSurvey
MPU I-04A 50029220680100 201092 11/22/2024 HALLIBURTON COILFLAG
MPU J-02 50029220710000 190096 12/22/2024 READ CaliperSurvey
PBU L-04 50029233190000 206120 11/23/2024 HALLIBURTON WFL-TMD3D
PBU L-221 50029233850000 208031 12/11/2024 HALLIBURTON WFL-RMT3D
PBU Z-ϯϰ 50029234690000 212061 12/15/2024 HALLIBURTON WFL-RMT3D
PBU Z-2ϯϱ 50029237600000 223055 9/24/2024 READ InjectionProfile
PBU Z-ϮϮϯ 50029237200000 222080 11/24/2024 HALLIBURTON WFL-TMD3D
SCU 42-05Y 50133205700000 207082 12/7/2024 HALLIBURTON EPX-MFC24
TBU D-16RD 50733201830100 180110 12/19/2024 READ CaliperSurvey
TBU D-17RD 50733201680100 181023 12/21/2024 READ CaliperSurvey
Please include current contact information if different from above.
T39915
T39916
T39916
T39917
T39918
T39919
T39920
T39921
T39922
T39923
T39924
T39925
T39926
T39927
T39928
T39929
PU F-40 50029222150000 191117 11/9/2024 READ CaliperSurvey
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2025.01.07 15:26:55 -09'00'
9
Drilling Manager
11/20/23
Monty M
Myers
By Grace Christianson at 3:09 pm, Nov 20, 2023
* BOPE test to 3500 psi.
* Variance to 20 AAC 25.112 (i) approved for alternate plug placement with fully
cemented liner on upcoming sidetrack.
DSR-11/20/23MGR21NOV23
10-407
SFD 11/24/2023JLC 11/24/2023
Brett W. Huber, Sr.
Digitally signed by Brett W. Huber,
Sr.
Date: 2023.11.24 15:20:51 -09'00'
RBDMS JSB 122324
To: Alaska Oil & Gas Conservation Commission
From: Trevor Hyatt
Drilling Engineer
Date: November 20, 2023
Re: PBU F-40 Sundry Request
Sundry approval is requested to set a whipstock and mill the window in F-40, as part of the
pre-rig for drilling and completing of the proposed F-40A CTD lateral.
Proposed plan for F-40A Producer:
Prior to drilling activities, screening will be conducted to drift for whipstock and MIT. E-line will set a 4-1/2"x5-1/2"
whipstock. E-line or coil will mill the SWN-nipple. Coil will mill window pre-rig. If unable to set the whipstock or mill
the window, for scheduling reasons, the rig will perform that work.
See F-40A PTD request for complete drilling details - A coil tubing drilling sidetrack will be drilled with the Nabors
CDR2 rig. The rig will move in, test BOPE and kill the well. If unable to set whipstock pre-rig, the rig will set the 4-
1/2"x5-1/2" whipstock. A single string 3.80" window + 10' of formation will be milled. The well will kick off drilling in
the Ivishak Zone 4 and land in Ivishak Zone 2. The lateral will continue in Zone 2 and 1 to TD. The proposed
sidetrack will be completed with a 3-1/2"x3-1/4"x2-7/8” L-80 solid liner, cemented in place and selectively
perforated post rig (will be perforated with rig if unable to post rig). This completion will completely isolate and
abandon the parent Ivishak perfs.
This Sundry covers plugging the existing Ivishak perforations via the liner cement job or liner top packer, if the
liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)).
Pre-Rig Work - (Estimated to start December 2023):
1. Slickline: Dummy WS drift and Caliper
a. Drift and Caliper past whipstock setting location
2. Fullbore: MIT
a. MIT-IA to 2,500 psi
3. E-line: Set 4-1/2”x5-1/2” whipstock
a. Top of window at 10,170’ MD (top of whipstock at 10,168’ MD)
b. Oriented 180° ROHS (Low Side)
4. Service Coil: Mill Nipple and Window (mill with rig if needed)
a. Mill SWN nipple at 9,755’ MD to 3.80”
b. Mill Window
I. MIRU Service Coil Window Milling Surface Kit
II. Give AOGCC 24hr notice prior to BOPE test
III. Test BOPE to 3500 psi. MASP with gas (0.10 psi/ft) to surface is 2,387 psi
IV. Mill 3.80” window plus 10’ of rat hole
V. Single string window exit out of 5-1/2” liner
5. Valve Shop: Pre-CTD Tree Work as necessary
Rig Work:
x Reference PBU F-40A PTD submitted in concert with this request for full details.
x General work scope of Rig work:
1. MIRU and Test BOPE - MASP with gas (0.10 psi/ft) to surface is 2,387 psi
a. Give AOGCC 24hr notice prior to BOPE test
2. Mill Window (only if not done pre-rig)
3. Drill Build and Lateral
4. Run and Cement Liner*
5. Perforate (only if not done post-rig)
6. Freeze Protect and RDMO
7. Set LTP* (if needed), RPM log and perforate post rig
* Approved alternate plug placement per 20 AAC 25.112(i)
PTD
Sundry 323-630
The sundry and permit to drill will be posted in the Operations Cabin of the unit during the window milling
operation.
Window Milling Fluids Program:
x A min EMW of 8.4 ppg KCL. KCl will be used as the primary working fluid and viscous gel sweeps will be
used as necessary to keep the hole clean.
x The well will be freeze protected with a non-freezable fluid (typically a 60/40 methanol/water mixture) prior
to service coil’s departure.
x Additionally, all BHA’s will be lubricated and there is no plan to “open hole” a BHA.
Disposal:
x All Class l & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4.
x Fluids >1% hydrocarbons or flammables must go to GNI.
x Fluids >15% solids by volume must go to GNI.
Hole Size:
x The window and 10’ of formation will be milled/drilled with a 3.80” OD mill.
Well Control:
x BOP diagram is attached.
x AOGCC will be given at least 24-hour notice prior to performing a BOPE function pressure test so that a
representative of the commission can witness the test.
x Pipe rams, blind rams, CT pack off, and choke manifold will be pressure tested to 250 psi and at least
3,500 psi.
x BOPE test results will be recorded in our daily reporting system (Alaska Wells Group Reporting System)
and will provide the results to the commission in an approved format within five days of test completion.
x BOPE tests will be performed upon arrival (prior to first entry into the well) and at 7 days intervals
thereafter.
x 20 AAC 25.036 (c)(4)(C) requires that a BOPE assembly must include “a firewall to shield accumulators and
primary controls”. A variance is requested based on the result of the joint hazop with the AOGCC. For our
operation, the primary controls for the BOPE are located in the Operations Cabin of the Coiled Tubing Unit,
and the accumulators are located on the backside of the Operations Cabin (opposite side from the well).
These are approximately 70' from the well.
Hazards:
x PBU F-Pad is an H2S pad.
o The highest recorded H2S well on the pad was from F-24 (160 ppm) in 2007.
o The last recorded H2S on F-40 is 2 ppm taken in 2023.
Reservoir Pressure:
x The estimated reservoir pressure is expected to be 3,267 psi at 8,800’ TVD (7.14 ppg equivalent).
x Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,387 psi (from estimated
reservoir pressure).
x Reservoir pressure will be controlled with a closed circulating system and choke for backpressure to
maintain overbalance to the formation.
Trevor Hyatt CC: Well File
Drilling Engineer Joseph Lastufka
907-223-3087
Coiled Tubing BOPs
Well Date
Quick Test Sub to Otis -1.1 ft
Top of 7" Otis 0.0 ft
Distances from top of riser
Excluding quick-test sub
Top of Annular 2.75 ft
C L Annular 3.40 ft
Bottom Annular 4.75 ft
CL Blind/Shears 6.09 ft
CL 2.0" Pipe / Slips 6.95 ft B3 B4
B1 B2
Kill Line Choke Line
CL 2-3/8" Pipe / Slip 9.54 ft
CL 2.0" Pipe / Slips 10.40 ft
TV1 TV2
T1 T2
Flow Tee
Master
Master
LDS
IA
OA
LDS
Ground Level
3" LP hose open ended to Flowline
CDR2-AC BOP Schematic
CDR2 Rig's Drip Pan
Fill Line from HF2
Normally Disconnected
3" HP hose to Micromotion
Hydril 7 1/16"
Annular
Blind/Shear
2-3/8" Pipe/Slips
2 3/8" Pipe/Slips
2 3/8" Pipe/Slips
7-1/16"
5k Mud
Cross
2-3/8" Pipe/Slips
3.0" Pipe / Slip
HF
nneceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
Sundry Application
Well Name______________________________
(PTD _________; Sundry _________)
Plug for Re-drill Well
Workflow
This process is used to identify wells that are suspended for a very short time prior to being
re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and
assigned a current status of "Suspended."
Step Task Responsible
1 The initial reviewer will check to ensure that the "Plug for Redrill" box in
the upper left corner of Form 10-403 is checked. If the "Abandon" or
"Suspend" boxes are also checked, cross out that erroneous entry and
initial it on the Form 10-403.
Geologist
2 If the “Abandon” box is checked in Box 15 (Well Status after proposed
work) the initial reviewer will cross out that checkbox and instead, check
the "Suspended" box and initial those changes.
Geologist
The drilling engineer will serve as quality control for steps 1 and 2.
Petroleum
Engineer
(QC)
3 When the RA2 receives a Form 10-403 with a check in the "Plug for
Redrill" box, they will enter the Typ_Work code "IPBRD" into the
History tab for the well in RBDMS. This code automatically generates
a comment in the well history that states "Intent: Plug for Redrill."
Research
Analyst 2
4 When the RA2 receives Form 10-407, they will check the History tab
in RBDMS for the IPBRD code. If IPBRD is present and there is no
evidence that a subsequent re-drill has been completed, the RA2 will
assign a status of SUSPENDED to the well bore in RBDMS. The RA2
will update the status on the 10-407 form to SUSPENDED, and date
and initial this change.
If the RA2 does not see the "Intent: Plug for Redrill" comment or code,
they will enter the status listed on the Form 10-407 into RBDMS.
Research
Analyst 2
5 When the Form 10-407 for the redrill is received, the RA2 will change the
original well's status from SUSPENDED to ABANDONED.
Research
Analyst 2
6 The first week of every January and July, the RA2 and a Geologist or
Reservoir Engineer will check the "Well by Type Work Outstanding"
user query in RBDMS to ensure that all Plug for Redrill sundried wells
have been updated to reflect current status.
At this same time, they will also review the list of suspended wells for
accuracy and assign expiration dates as needed.
Research
Analyst 2
Geologist or
Reservoir
Engineer
SFD
11/24/2023
SFD
11/24/2023
PBU F-40
323-630191-117
By Samantha Carlisle at 7:39 am, Sep 06, 2022
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:191-117
6.50-029-22215-00-00
PRUDHOE BAY, PRUDHOE OIL
BP Exploration (Alaska), Inc 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
10880
10790
9117
9600, 9730
None
None
8252, 8347
Casing: Length: Size: MD: TVD:Burst:Collapse:
Structural
Conductor 80 20" 32 - 112 32 - 112
Surface 2648 10-3/4" 31 - 2679 31 - 2678
Intermediate 9984 7-5/8" 28 - 10012 28 - 8552 8180 5120
Production
Perforation Depth: Measured depth: 10022 - 10696
feet
True vertical depth:8559 - 9052 feet
Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6#, 13Cr80 / L-80 26 - 9767 26 - 8373
Packers and SSSV (type, measured and
true vertical depth)
Liner 1116 5-1/2" 9762 - 10878 8370 - 9178 7740 6280
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
212970030251
2117664 700
20568
194 2304
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Stone, Christopher
Christopher.Stone@bp.com
Authorized Name:Stone, Christopher
Authorized Title:
Authorized Signature with Date:Contact Phone:+1 907 564 5518
Treatment descriptions including volumes used and final pressure:
13.
D & K Pad / GC1 Lead Petroleum Engineer
Operations Performed1.
Abandon Plug Perforations Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured9180
Sundry Number or N/A if C.O. Exempt:
N/A
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Operations shutdown
Change Approved Program
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend 5Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: P.O. Box 196612 Anchorage,
AK 99519-6612
7.Property Designation (Lease Number):ADL 028280 PBU F-40
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
4-1/2" Baker S-3 Perm Packer
4-1/2" Baker SABL-3 Packer
9600 8252
9730 8347
1R6669,QVWDOOHG
Christopher Stone Digitally signed by Christopher Stone
Date: 2020.04.27 11:47:12 -08'00'
By Samantha Carlisle at 12:05 pm, Apr 27, 2020
ACTIVITYDATE SUMMARY
3/27/2020
***WELL ON-LINE ON ARRIVAL***
PERFORATE 10022'-10053' 2.785" MAX FORCE 6SPF 60 DEG PHASE. CCL TO
TOP SHOT 4.6', CCL STOP DEPTH 10017.4'.
CORRELATED TO SCHLUMBERGER RESERVOIR SATURATION TOOL SIGMA -
BORAX LOG
***JOB COMPLETE, PAD OP NOTIFIED***
Daily Report of Well Operations
PBU F-40
STATE OF ALASKA
AKA OIL AND GAS CONSERVATION COMI SION
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Abandon U Repair Well U Plug Perforations Li Perforate Li Other U
Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extensions
Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended WOO
2.Operator 4.Well Class Before Work: 5.Permit to Drill Number:
BP Exploration(Alaska),Inc ,
Name: Development0 * Exploratory ❑ 191-117-0 .
3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number:
Anchorage,AK 99519-6612 50-029-22215-00-00 •
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL0028280 PBU F-40
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):
To Be Submitted PRUDHOE BAY,PRUDHOE OIL
11.Present Well Condition Summary:
Total Depth measured 10880 feet • Plugs measured None feet
true vertical 9179.56 feet Junk measured None feet
Effective Depth measured 10790 feet Packer measured See Attachment feet
true vertical 9117.42 feet true vertical See Attachment feet
Casing Length Size MD ND Burst Collapse
Structural None None None None None None
Conductor None None None None None None
Surface 2656 10-3/4"45.5#L-80 28-2684 28-2683.89 5210 2480
Intermediate None None None None None None
Production 9985 7-5/8"29.7#NT-95HS 27-10012 27-8552.03 8180 5120
Liner 1116 5-1/2"17#13CRFL4S 9762-10878 8370.25-9178.18 0 0
Perforation depth Measured depth 10534-10539 feet 10616-10618 feet 10618-10620 feet 10620-10638 feet 10638-10640 feet
10640-10642 feet 10648-10658 feet 10658-10674 feet 10674-10696 feet
True Vertical depth 8938.33-8941.9 feet 8996.4-8997.8 feet 8997.8-8999.21 feet 8999.21-9011.86 feet 9011.86-9013.27 feet
9013.27-9014.67 feet 9018.89-9025.9 feet 9025.9-9037.12 feet 9037.12-9052.48 feet
Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment
Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer
None None None SSSV
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
Treatment descriptions including volumes used and final pressure:
SCANNED NOV 0 20 3
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 336 20222 24 0 1910
Subsequent to operation: 293 13614 16 0 2148
14.Attachments: 15.Well Class after work:
Copies of Logs and Surveys Run Exploratory❑ Development 0 Service❑ Stratigraphic ❑
Daily Report of Well Operations X 16.Well Status after work: Oil U• Gas U WDSPIJJ
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCD
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Contact Nita Summrehays Email Nita.Summerhayst AN,
BP.com
Printed Name Nita Summer,ys Title Petrotechnical Data Technician
na ■mr/L'iM :W�1'/A7,i� Phone 564-4035 Date 6/26/2013
�� �1
Ø'S' RBDMS JUL 2 2'i.6)
1--/ 31 1 ) I Submit Original Only
Form 10-404 Revised 10/2012 9 y
•
Daily Report of Well Operations
ADL0028280
***WELL S/I ON ARRIVAL***
RAN 10' x 2-7/8" DUMMY GUN, TEL, SAMPLE BAILER
LOC TT @ 9744' SLM (9754' ELM) TD @ 10652' SLM (hard bottom no sample)
5/30/2013 ***WELL S/I ON DEPARTURE***
T/1/0=2450/1100/250 temp=60* Load & kill Pre E-line (ad-perfs) Pumped into tbg a 5
bbls meth spear, 250 bbls 100*crude. Valve positions upon departure: SV WV SSV=
6/4/2013 closed. MV IA OA= open FWHPS= 200/1100/100
***WELL SHUT IN ON ARRIVAL***(ELINE ADPERI-)
INTIAL T/I/O = 0/1090/0 PSI
PERFORATE INTERVAL: 10534' - 10539'W/5' x 2 7/8" POWERJET, HMX GUN
WELL SHUT IN ON DEPARTURE. DSO NOTIFIED OF WELL STATUS
FINAL T/I/O = 20/1100/0 PSI
6/4/2013 ***JOB COMPLETE***
FLUIDS PUMPED
BBLS
2 DIESEL
5 METH
250 CRUDE
257 TOTAL
Casing / Tubing Attachment
ADLOO2828O
Casing Length Size M D TVD Burst Collapse
PRODUCTION 9985 7-5/8"29.7# NT-95HS 27 - 10012 27 - 8552.03 8180 5120
SURFACE _ 2656 10-3/4"45.5# L-80 28 - 2684 28 - 2683.89 5210 2480
TUBING 9701 4-1/2" 12.6# 13Cr80 26 - 9727 26 - 8345.2 8430 7500
TUBING 56 4-1/2" 12.6# L-80 9711 - 9767 8333.73 - 8373.84 8430 7500
LINER 1116 5-1/2" 17# 13CRFL4S 9762 - 10878 8370.25 - 9178.18
•
•
• •
Packers and SSV's Attachment
ADL0028280
SW Name Type MD TVD Depscription
I F-40 _ PACKER 9600 8185.13 4-1/2" Baker S-3 Perm Packer
I
F-40 PACKER 9730 8279.91 4-1/2" Baker SABL-3 Packer
WHLFFAD- 4-1111w5MFINC • O L 'T NOTES: ***CHROME 4-1/2"TBG3 5-1/2" I
__.. ..
ACTUATOR= BAKER C
NT1AL KB.ELE 67.43'
E3F H.EV= 38.43'
KCP= 3200' I { 2119° H4-1/2"HES X NP,D=3.813" I
Abu Angie=w 47° 6032'
= 10436'
Datum he GAS LFT MANDRELS
Datum ND= 8800'SS ST ADD TVT) DEV TYPE VLV LATCH FORT DATE
5 3092 3091 7 KBG-2 DOA+E BK 16 7/15/12
40-3/4`CSG,45.59,L-80/K-55,D=9.953' —I 2879' 4 5340 4989 43 KBG-2 DOTE BK 16 7/15/12
3 7023 6196 39 KBG-2 DM' BK 0 6121/05
2 8267 7190 34 KBG-2 OMY BK 0 6/21/05
1 _9508 8185 43 KBG-2 DMY BK 0 6/21/05
Minimum ID =3.725" @9755' I I I 9576' H4-1/2"HESX MP,D=3.813" I
4-1/2" PARKER SWN NIPPLE
g I 9600' H7-5/fr X 4-1/2"BKR S-3 PKR,D=3.875" I
' I I 9006' H4-112"HES X NP,D=3.813" I
4-1/2"18G,12.6#,13CR60,.0152 bpf,D=3.958' H 9718' I\ 9719' H4-112"SWS PARKER NP,D=3.813" I
7U 3it STUB 9711' �L
9727' I-I4-1/2"X 6-1/2-LMiQUEOVERSHOT I
9729' —I RIGHT HAND Ra.EASE LATCH BKR K-22 I
I 9730' H7-5/8"X 4-1/2"BKR SABL-3 PKR,D=4.00" I
' I I 9755' I--I4-112"PARKER SWN M 0=3.725" I
ATOP OF 5-1/2"LNER H 9762' I•--®
1 4-1/2`TBG,12.5/,L-80,.0152 bpf,D=3.958' H 9767' I / \ ( 976T H4-1/2"WED.D=3.958" I
9754' HaND Ha-D TT LOGGED 12/03/91 I
1 7-5/8"CSG,29.7#,NT-95,D=6.875" H 1ooir
PERFORATION SUMAARY
FIEF LOG:ATLAS BRCS ON 11/12/91
ANGLEAT TOP PERF:44°@ 10534'
Note:Refer b Production CB for historical perf data
SIZE SPF 11B2VAL OpNSgz SHOT SQZ
2-7/8" 6 10534-10539 0 06/04/13
3-3/8" 12 10616-10640 0 09/03/94
3-3/8" 4 10640-10642 0 07/18/97
3-3/8" 4 10648-10696 0 12/04/91
3-3/8" 4 10648-10658 0 01/05/92
3-3/8" 4 10648-10674 0 01/30/96
FWD 10790' •*•1•*•1•*•*•*•1
15-1/7 LNR,17#,13-CR,FL4S,.0232 bpf,D=4.892" H 10878
DATE REV BY COMMENTS .. DATE REV BY COMMENTS PRUDHOE BAY UNIT
11/16/91 ORIGINAL COMPLETION 08128/12 TWJMD 'TREE Q0(08/24/12) WB-L: F-40
06/21/05 DOYON 16 RWO 06/11/13 SET/JI ) ADPERFS(06/04/13) FEI IT No:°1911170
06/12/04 CMD/PAG PB2F CORRECTIONS AR No: 50-029-22215-00
06/24/05 TWS/PJC GLV CO SEC 2,T11N,R13E,2273'FSL&2394'RM..
03/02/10 JLWTRPC 7-5/8"CSG CORRECTION
07/18/12 WE C/.14) GLV CIO(07/15/12) BP Exploration(Alaska)
OPERABLE: Producer F-40 (PTD #1970) Tubing Integrity Restored • Page 1 of 2
Regg, James B (DOA)
From: AK, D&C Well Integrity Coordinator [AKDCWeIIlntegrityCoordinator@bp.com] ~~~ 7Jj5~~o
Sent: Sunday, July 11, 2010 7:56 PM J
To: AK, D&C Well Integrity Coordinator; Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); Regg, James B
(DOA); AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Wellpad
Lead; AK, RES GPB East Production Optimization Engineer; AK, RES GPB West Production Optimization
Engineer; AK, OPS Well Pad DFT N2; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services
Operations Team Lead; Cismoski, Doug A; Engel, Harry R; AK, OPS Prod Controllers
Cc: King, Whitney
Subject: OPERABLE: Producer F-40 (PTD #1911170) Tubing Integrity Restored
All,
Producer F-40 (PTD #1911170) passed aMIT-IA to 3000 psi 07/08/10 confirming two mechanical
barriers. A PPPOT-T also passed 07/10/10 confirming we ead sea Integrity. The well has been
reclassified as Operable and may be put on production when convenient.
Operators: Please take caution when POP'ing the well, as the IA is liquid packed. ~'
Please call with any questions or concerns.
Thank you,
Tiffany Quy
(for the Well Integrity Coordinator Gerald Murphy/Torin Roschinger)
Projects Well Integrity Engineer
phone: (907) 659-5102
cell: (253) 576-6153 w.~$~~~% .~, cif ~ .~ ~~~
tiffg0@bp.com "`
From: AK, D&C Well Integrity Coordinator
Sent: Sunday, July 04, 2010 10:05 PM
To: 'Maunder, Thomas E (DOA)'; "Schwartz, Guy (DOA'; 'Regg, James B (DOA)'; AK, OPS GCl OSM; AK, OPS GCl Facility OTL; AK, OPS
GCl Field 0&M TL; AK, OPS GCl Wellpad Lead; AK, RES GPB East Production Optimization Engineer; AK, RES GPB West Production
Optimization Engineer; AK, OPS Well Pad DFT N2; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead;
Cismoski, Doug A; Engel, Harry R; AK, D&C Well Integrity Coordinator; AK, OPS Prod Controllers
Cc: Janowski, Carrie; King, Whitney; Quy, Tiffany
Subject: UNDER EVALUATION: Producer F-40 (PTD #1911170) Sustained Casing Pressure above MOASP
All,
Producer F-40 (PTD #1911170) has confirmed sustained casing pressure on the IA during the current
proration. The wellhead pressures were tubing/IA/OA equal to 0/2040/120 on 6/30/2010. The well has
been reclassified as Under Evaluation.
Plan forward:
1. DHD: MIT-IA to 3000 psi
2. Wellhead: PPPOT-Tubing
A TIO plot and wellbore schematic have been included for reference.
7/15/2010
OPERABLE: Producer F-40 (PTD #1970) Tubing Integrity Restored • Page 2 of 2
« File: Producer F-40 7-4-2010 TIO Plot.doc »
Please call if there are any questions or concerns.
Thank you,
Gerald Murphy (alt. Torin Roschinger)
Well Integrity Coordinator
Office (907) 659-5102
Cell (907) 752-0755
Pager (907) 659-5100 Ext. 1154
7/15/2010
PBU F-40
PTD #1911170
7/4/2010
TIO Pressures Plot
__ _ __
Well: F-40
4:000
•
3,000
?,000
1.000
04110110 04124110 05109'10 05,'22110 0610510
09!19110 0'103110
--~- T bg
-E- IA
-~ DA
OOA
OOOA
On
TREE= 4-1/16"5MChN
WELLHEAD = 11" 5M FMC
AC1Ur+ i vR = ~ BraKcti
KB. ELEV = 67.43'
BF. ELFV =
_ 38.43'
_
KOP = 3200'
Max Angle = 47 @ 6032'
Datum MD = 10436'
Datum TVD = 8800' SS
~ 10-314" CSG, 45.5#, L-80/K-55, ID = 9.953" ~
Minimum ID = 3.725" @ 9755'
4-112'" PARKER SV1tN NIPPLE
F-40
SAFETY S: ''**CHROME4-1 /2" TBG& 5-1/2"'
LNR***
1!2" HES X NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
5 3092 3091 7 KBG-2 DMY BK 0 4128/10
4 5340 4989 43 KBG-2 DMY BK 0 4/28110
3 7023 6196 39 KBG-2 DMY BK 0 6121/05
2 8267 7190 34 KBG-2 DMY BK 0 6!21/05
1 9508 8185 43 KBG-2 DMY BK 0 6121105
9576' )-(4-112" HES X NIP, ID = 3.813"
7-518" X 4-1/2" BKR 5-3 PKR, ID = 3.875"
4-1/2" HES X NIP, ID = 3.813"
4-112" TBG, 12.6#, 13CR80, .0152 bpf, ID = 3.958"
TUBING 5TU6
9718'
9711' ~
14-1/2" SWS PARKER NIP, ID = 3.813" I
9727' -~4-1(2" X 6-1(2" UNIQUEOVERSHOT
9729' RIGHT HAND RELEASE LATCH BKR K-22
9730' ~ 7-518" X 4-112" BKR SABL-3 PKR, ID = 4.00"
978$' }--i4-1/2" PARKER SWN NIP, ID = 3.725"
ITOP OF 5-112" LINER
4-112" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958"
9762'
9767'
7-5/8" CSG, 29.7#, NT-95, ID = 6.875" ~-{ 10012'
PERFORATION SUMMARY
REF LOG: ATLAS BHCS ON 11/12/91
ANGLE AT TOP PERF: 45 @ 10616'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 12 10616 - 10640 O 09!03/94
3-3i8" 4 10640 - 10642 O 07/18/97
3-3/8" 4 10648 - 10696 O 12/04/91
3-318" 4 10648 - 10658 O 01/05/92
3-3/8"' 4 10648 - 10674 O 01/30/96
PBTD --1 107so,
5-1/2" LNR, 17#, 13-C R, FL4S, .0232 bpf, ID = 4.892" 10$78'
} 9767-~4-1i2" WLEG. ID=3.958"
9754' ELMD TT LOGGED 12/03(91
DATE REV BY COMMENTS DATE REV BY COMMENTS
11!16!91 ORIGINAL COMPLETION 02/02/10 RCT/PJC GLV C/O {01!25110)
06(21/05 DOYON 16 RWO 03(02/10 JLW/RPC 7-5/8" CSG CORRECTION
06/12(04 CMO/PAG PERF CORRECTIONS 05/01/10 CJN/PJC GLV C/O {04/28/10}
06(24/05 TWS/PJC GLV C/O
02/02106 RWLlPJC DRLG CORRECTIONS
02/22/08 JLJITCH GLV C/O (02/14/08)
PRUDHOE BAY UNIT
WELL: F-40
PERMIT No: 1911170
API No: 50-029-22215-00
SEC 2, T11 N, R13E, 3005' FNL & 2884' FEL
BP Exploration (Alaska}
OPERABLE: F-40 (PTD #1911170) Ping TIFL ~ Page 1 of 1
Regg, Jaynes B (DOA)
From: N;;U, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com]
Sent: Tuesday, March 30, 2010 4:49 PM ~~~ ~~ 4 ~~
To: N U, ADW Well Integrity Engineer; Regg, James B (DOA); Maunder, Thomas E (DOA); GPB, Area Mgr
C ntral (GC1/3/FS3); GPB, GC1 OTL; GPB, GC1 Wellpad Lead; GPB, Well Pad DFT-N2; Rossberg, R
Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization
Engr; GPB, Prod Controllers; Isakson, Shawn
Cc: Quy, Tiffany
Subject: OPERABLE: F-40 (PTD #1911170) Passing TIFL
All,
,/
Producer F-40 (PTD #1911170) passed a TIFL on 03/29/10 verifying tubing integrity. The well has been reclassified as
Operable andll may be placed on production when convenient for operations.
Thank you,
Torin
!n ~)
From: NSU, ADW Well Integrity Engineer
Sent: Monday, March 29, 2010 8:58 AM
To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; GPB, Area Mgr Central (GCl/3/FS3); GPB, GCl OTL; GPB, GCl Wellpad Lead; GPB, Well Pad DFT-
N2; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers; Isakson,
Shawn
Cc: NSU, ADW',Well Integrity Engineer; Quy, Tiffany
Subject: UNDER EVALUATION: F-40 (PTD #1911170) Sustained Casing Pressure
All,
Well F-40 (PTD #1911170) was found to have sustained casing pressure on the IA. On 03/26/10, the wellhead pressures
were tubing/IA/OA equal to 1050/2080/200. The well has been reclassified as n er Evaluation for further diagnostics.
~--~
A TIO plot and wellbore schematic have been included for reference.
« File: F-401TI0 Plot 03-29-10.doc» « File: F-40.pdf» e/
Please call with any questions or concerns.
Thank you,
Torin Roschinger (alt. Anna Dube)
Wel I I nteg rity'Coord i nator
Office (907) 659-5102
Harmony Radio x2376
Cell (406) 57~-9630
Pager (907) 659-5100 Ext. 1154
3/31/2010
PBU F-40
PTD 191-117
3/29/2010
TIO Pressures
__ _ _ _ _ .
Well: F-40
x,000
3,000
2,000
1,000
--~- T bg
-F IA
--~-- OA
OOA
OOOA
On
•i
01 !02110 01116110 01 !30110 02113!10 02121'110 03/13110 0312 i 110
Sck~n~orger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2938
ATTN: Beth
Well Job #
N0.5468
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Log Description Date BL Color CD
13-35 BBKA-00005 CROSS FLOW CHECK 02/07/10 1 i
A-02
M•08 AWJM00072
AUTO-00035 MEMORY PROD PROFILE
CROSS FLOW CHECK - 01!31!10
02/07/10 1
1 1
1
V-123
4-38/K-34 AWJN-00033
AWJh00070 SCMi ~.
MEMORY PROD PROFILE 01/15/10
02/02/10
1 1 1
1
Y-36
F-40 AYKP-00061
AZCM-00053 RST
RST 01/14/10
12129/09 1
1 1
1
01-14A AWJI-00067 MCNL 01/07/10 1 1
P1.24L1-01 12034915 OH LDWG EDIT (FLEX ~ 08/12/08 1 1
V-224 09AKA0147 OH MWD/LWD EDR 12/08/09 2 1
BP Exploration (Alaska) Inc.nLyL,r , ~ • u,V"~r,~ ~"V ~~ ~ ~~r,rr•V vr.~ wr•. c..~n r v:
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
02/ 1 a/ 10
•
· STATE OF ALASKA RE
ALASKA \"It AND GAS CONSERVATION CO¡,~ISSION . CEIVED
REPORT OF SUNDRY WELL OPERATION.SL 15 2005
1. Operations Performed:
o Abandon
o Alter Casing
o Change Approved Program
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
8. Property Designation:
ADL 028280
11. Present well condition summary
Total depth: measured
Effective depth:
true vertical
measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Alaska Oil & r,~s r.nn£:. r.nmmissior
Anchorage
o Suspend 0 Operation Shutdown 0 Perforate 0 Other
181 Repair Well 0 Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well
181 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension
67.43'
10878
9178
10790
9117
2679'
9984'
1116'
4. Current Well Class:
181 Development 0 Exploratory
o Stratigraphic 0 Service
5. Permit To Drill Number:
191-117
6. API Number:
50-029-22215-00-00
99519-6612
9. Well Name and Number:
PBU F·40
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
feet
feet Plugs (measured) None
feet Junk (measured) None
feet
Size MD TVD Burst
10-3/4" 2679' 2679' 3580
7-5/8" 10012' 8552' 8180
5-1/2" 9762' - 1 0878' 8370' - 9178' 7740
SCANNED JUL 2 Ü 2005
Collapse
2090
5120
6280
10616' - 10696'
8996' - 9052'
4-1/2", 12.6#
L-80
Tubing Size (size, grade, and measured depth):
Packers and SSSV (type and measured depth):
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
7-5/8" x 4-1/2" Baker 'SABL-3' packer; 7-5/8" x 4-1/2"
Baker 'S-3' packer; 4-1/2" 'X' Nipple
9730' & 9600';
2119'
Treatment description including volumes used and final pressure:
RBDMS BFL JUL 1 9 2D05
13.
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl Casinq Pressure
19,542 68 1,700
7,379 56 1,025
15. Well Class after proposed work:
o Exploratory 181 Development 0 Service
16. Well Status after proposed work:
181 Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
Contact Paul Chan, 564-5254 N/A
Oil-Bbl
Prior to well operation: 812
Subsequent to operation: 1,034
14. Attachments: 0 Copies of Logs and Surveys run
181 Daily Report of Well Operations
181 Well Schematic Diagram
Printed Name Terrie Hubble
Signature ~ e,Mio ~
Form 10-404 Revised 04/2004
Tubinq Pressure
1,625
700
Title Technical Assistant
CrRe I G r\f~t
Date [f1 (¡ '1 { OS
Prepared By Name/Number:
Terrie Hubble, 564-4628
Submit Original Only
Well:
Field:
API:
Permit:
)
)
F-40 Rig W orkover
Prudhoe Bay Unit
50-029-22215-00-00
191-117
Accept:
Spud:
Release:
Rig:
PRE-RIG WORK
06/04/05
PULL PRONG AT 9724' SLM. PULL PLUG AT 9739' SLM.
06/15/05
N/A
06/18/05
Doyon 16
06/07/05
CORRELATION LOG GAMMA RAY/CCL LOG 03-DEC 1991. SET HAL FAS DRILL PLUG IN 4.5" TUBING TAIL
AT 9740'. RUN TUBING PUNCHER (2FT, 9 SHOTS) AND PUNCH TUBING AT 9650 FT.
06/08/05
PERFORM STRING SHOT -12 FT (9705 - 9717 FT). PERFORM 3 5/8" CHC - CUT 4.5" TUBING AT FIRST PUP
ON TOP OF PACKER = 9711 FT. CORRELATION LOG (1991 COMPLETION) GAMMA RAY/CCL LOG 03-DEC-
1991.
)
)
BP EXPLORATION
Operations .SummaryReport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
6/14/2005
6/15/2005
Rig Released From J-24a @ 1500 hrs 6/14/2005. Prep Rig For
Move.
R / U Bridle Lines. R / D and Service TD. L / D Derrick. Install
Booster
Tested Boosters and Moved Rig to the Edge of Pad.
Ready to Move, Waited on Security Escort.
Security on location. Moved Rig from J-Pad to F-Pad.
PJSM, Raised and Pinned Derrick. Removed Boosters.
Removed BOPE from Transport Stand and Installed BOPE on
Pedistal.
M / U Manifold, Lower Stand Pipe. Laid Down Herculite and
Matting Boards.
Spotted Rig over F-40. Shimmed and Leveled Rig.
P / U Top Drive From Rotary Table. R / U lines to 7-5/8" x
4-1/2" Annulus. Accepted Rig at 0200 hrs.
R / U DSM Lubricator, Latched and Pulled BPV, R / D DSM
Lubricator. Took On Seawater. Mixed Vis'd Detergent Sweeps
Circulated Out Diesel Freeze Protect. Pumped Down IA Took
Returns Off of Tubing, Pumped 100 bbls 140 deg Seawater, 3
bpm, 300 psi. Shut Down Pump, Switched Valves, Pumped
Down Tubing and Took Returns Off of lA, Pumped 40 bbl
Hi-Vis Detergent Sweep Followed by 550 bbls of 140 deg
Seawater, Pump Rate 10 bpm, 1,600 psi.
Ran and Set TWC, Tested from Below to 1,000 psi.
Held PJSM with Crew and FMC Rep. N / D 4-1/16" 5M Tree
and Adapter Flange. Bled Down Control Lines.
M / U 4-1/2" TDS x 4-1/2" IF XO to Tubing Hanger w/ 8
Rounds. Attempted to Backout XO Without Success. Decision
Made to N / U BOP Stack w/ XO Made Up to Hanger.
Continued to Bleed and Terminate Control Lines and Ports.
FMC Encountered Stripped Threads and Bad Connections in
Terminating Control Lines and Ports. Completed Termination
Successfully.
DECOMP N / U BOPE: 13-5/8" 5M GK Annular Preventer, 13-5/8" 5M
Blind Shear Rams, Mud Cross w/ Kill Choke Lines, 13-5/8"
Lower Pipe Rams with 3-1/2" x 6" Variable Rams and Spacer
Spool. N / U Riser. Installed Flow Line.
DECaMP M / U Test Joint. RIH and M / U to XO in Tbg Hanger. R / U
BOPE Test Equipment.
DECOMP Test BOPE, Test Annular Preventer, Blind Rams, Pipe Rams,
Choke Manifold and Valves, HCR's, Kill Line, Choke Line, Floor
Valves, and IBOP to 3500 psi high /250 psi low. Test
Accumulator Unit. All Test Held for 5 mins. All Test held w/ no
leaks or Pressure Losses. Test Witnessed by BP Drilling
Supervisor. AOGCC Witness Waived by John Crisp.
Blew Down and R / D All Test Equipment.
M / U Joint of DP to Top Drive. RIH and Engage XO in Tubing
Hanger.
Check for Pressure on lA, on Vac. BOLDS and Pull Hanger to
Floor w/155,OOO #
PJSM, Tie Off and Cut Control Lines from Tubing Hanger. B /
o and L / D Tubing Hanger and Joint of DP from Tubing String.
F-40
F-40
WORKOVER
DOYON DRILLING INC.
DOYON 16
From-To Hours Task Code NPT Phase
15:00 - 16:00 1.00 MOB P PRE
16:00 - 18:00 2.00 MOB P PRE
18:00 - 18:30 0.50 MOB P PRE
18:30 - 19:30 1.00 MOB N WAIT PRE
19:30 - 21 :30 2.00 MOB P PRE
21 :30 - 23:00 1.50 MOB P PRE
23:00 - 00:00 1.00 MOB P PRE
00:00 - 01 :00 1.00 MOB P PRE
01 :00 - 02:00 1.00 MOB P PRE
02:00 - 04:00 2.00 MOB P PRE
04:00 - 06:00 2.00 WHSUR P DECOMP
06:00 - 09:00 3.00 KILL P DECaMP
09:00 - 10:00 1.00 WHSUR P DECaMP
10:00 - 12:00 2.00 WHSUR P DECOMP
12:00 - 13:00 1.00 WHSUR N SFAL DECOMP
13:00 - 15:00 2.00 WHSUR N SFAL DECOMP
15:00 - 17:30
2.50 BOPSUP P
17:30 - 18:00
0.50 BOPSUR P
18:00 - 21 :00
3.00 BOPSUP P
21 :00 - 21 :30 0.50 BOPSUR P DECOMP
21 :30 - 22:00 0.50 PULL P DECOMP
22:00 - 22:30 0.50 PULL P DECOMP
22:30 - 23:00 0.50 PULL P DECOMP
Page 1 of 4
Start: 6/14/2005
Rig Release: 6/18/2005
Rig Number:
Spud Date: 10/26/1991
End: 6/18/2005
Description of Operations
Printed: 6/20/2005 11: 1 0:20 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
)
)
BPEXPLORA TION
.O:perationsSµmmary RE!port
Page 2 014
F-40
F-40
WORKOVER
DOYON DRILLING INC.
DOYON 16
Start: 6/14/2005
Rig Release: 6/18/2005
Rig Number:
Spud Date: 10/26/1991
End: 6/18/2005
Date From - To Hours Task Code NPT Phase Description of Operations
6/15/2005 23:00 - 00:00 1.00 PULL P DECOMP M / U TDS XO and Circulating Head to Tubing String and
Circulate Bottoms Up at 8 bpm 860 psi., 255 bbls. R I U
Control Line Spooler.
6/16/2005 00:00 - 00:30 0.50 PULL P DECOMP Blew Down and RID Circulating Equipment. R / U to POOH
and LID Tubing.
00:30 - 03:00 2.50 PULL P DECOMP POOH, LID 52 Jts 4-1/2" 12.6# L-80 TDS Tubing, Spooled Up
Dual Control Line.
03:00 - 03:30 0.50 PULL P DECOMP B I 0 and LID SSSV Assy, RID Control Line Spooling
Equipment. Recovered 100% of Control Line, 4 SS Bands and
27 Line Clamps.
03:30 - 09:30 6.00 PULL P DECOMP POOH, LID Tubing. Total Recovery: 242 Joints 4-1/2" 12.6#
L-80 TDS Tubing, 5 GLM Assy's, 1 SSSV Assy, Cut Joint =
2.68'.
09:30 - 11 :00 1.50 PULL P DECOMP RID 4-1/2" Tubing Handling Equipment, Cleared Rig Floor,
Cleaned Rig.
11 :00 - 12:00 1.00 PULL P DECOMP Held PJSM. Brought BHA Components to Rig Floor.
12:00 - 12:30 0.50 PULL P DECOMP Ran and Set Wear Bushing, ID = 7.0625". R I U 2-7/8"
Handling Equipment.
12:30 - 14:30 2.00 CLEAN P DECOMP Held PJSM. M I U Drill Out I Dress Off BHA: 3.70" Junk Mill, Bit
Sub, 3 Jts 2-7/8" PAC DP, XO, Double Pin XO, 6-1/8" x 4-1/2"
Mill Shoe, WP Extension, Double Pin XO, 7-5/8" Casing
Scraper, Bit Sub XO, Bumper Sub, Oil Jars, XO, 9 x 4-3/4"
DC's. Total Length = 406.80'.
14:30 - 23:30 9.00 CLEAN P DECOMP RIH wI BHA on 4" DP to 9,677'. PI U 4" DP 1 x 1 from Pipe
Shed. Rabbitted All DP Run in Hole.
23:30 - 00:00 0.50 CLEAN P DECOMP M IU Jt #291 and Establish Parameters. P / U Wt = 175,000
Ibs; S I 0 Wt = 152,000 Ibs. M / U and RIH with Jt #292. Tag
Top of Tubing Stub 10' in on Joint #292 (- 9720'). PI U and
Rotate at 30 rpm's, 4,000 ft-Ibs torque, Rotating Wt = 160,000
Ibs. Fall Inside Tubing Stub and Continue to RIH. M I U Jt
#293 and RIH, Tag Top of Fas-Drill Plug at 5' in (-9746'). PI
U and Establish Circulation 5 bpm at 870 psi. Wash Back
Down and Confirm Tag on plug and not fill.
6/17/2005 00:00 - 01 :00 1.00 CLEAN P DECOMP Circulate 40 bbl Hi-Visc Detergent Sweep and Chase Out of
Hole with 420 bbls, 8.3 bpm at 1800 psi.
01 :00 - 01 :30 0.50 CLEAN P DECOMP Establish Parameters P I U Wt = 175,000 Ibs, S / 0 Wt =
152,000 Ibs, Rot Wt = 162,000 Ibs at 70 rpm's and 4,000 ft-Ibs
torque. Circulate at 5 bpm at 780 psi. Wash and Ream Down
to Top of Fas-Drill Plug at 9746'. Mill Fas-Drill Plug wI 2,000
Ibs WOM, 70 rpm's and 5,000 - 6,000 ft-Ibs torque. Milled on
Plug for 10 minutes then lost WOM and Circulation. Wash and
Ream another 7' (-9753') down and Tag Up on Plug again.
Mill on Plug wI 5,000 Ibs WOM, 70 rpm's and 5,000 - 7,000
ft-Ibs torque. Pump Rate at 2.0 bpm and 30 psi due to Loss of
Circulation. Mill less than 1 foot and break through. Wash and
Ream the remaining length of joint of DP cleanly. P I U and
Wash and Ream entire interval again.
01 :30 - 02:00 0.50 CLEAN P DECOMP PI U 2 Joints of DP and RIH to engage Top of Tubing Stub wI
Over Shot Assy. Tag up at 9720'. Wash and Ream over
Tubing Stub 7 feet w/ 3,000 WOM, 50 rpm's and 6,000 ft-Ibs
torque, 2 bpm at 30 psi. Repeat 2 times. Try to Swallow
Tubing Stub wI 0 Rotation and Circulation - Will not go over.
Wash and Ream over Stub 2 more time. Try to Swallow
Printed: 6/20/2005 11: 1 0:20 AM
')
)
BP EXPLORATION
Operations Summary Report
Tubing Stub wI 0 Rotation and Circulation again - Will not go
over. Put Slight Rotation in Sting and 0 I S Swallows Stub
Easliy. Lost Approx. 120 bbls During Milling Operations.
B I 0 and Blow Down Top Drive.
POOH and LID 4" DP. Pumped Double Displacement While
POOH.
POOH, B I 0 and LID BHA. C I 0 4" DP Handling Equipment
f/2-7/8" Handling Equipment. B I 0 and LID 2-7/8" DP.
RID 2-7/8" DP and BHA Handling Equipment. Cleared and
Cleaned Rig Floor. M I U Retrieving Tool to DP. Latched and
Pulled Wear Bushing.
Held PJSM. R / U 4-1/2" 13Cr Handling Equipment, R I U
Compensator and Torque Equipment.
M I U 4-1/2" 12.6# 13Cr80 Fox Tail Pipe Assembly: 6.50" x
4.650" Unique Overshot - 1 Jt 4-1/2" 12.6# 13Cr80 Fox Tubing
- Lower X Nipple Assy wI RHC-M Sleeve - 1 Jt 4-1/2" 12.6#
13Cr80 Fox Tubing - 7-5/8" x 4-1/2" Baker S-3 Packer Assy-
Upper X Nipple Assy. Bakerlocked All Connections Below
Packer. PI U All Assy's wI Compensator, Torque Turned All
Connections. M I U Torque 4,200 ft Ilbs. Doped Connections
Above Packer wI Jet Lube Seal Guard.
RIH w/ 4-1/2" 12.6# 13Cr80 Fox Tubing. P / U Joints wI
Compensator, Torque Turned All Connections. M / U Torque
4,200 ft Ilbs. Doped Connections wI Jet Lube Seal Guard.
Circulate 40 bbl Hi-Visc Detergent Sweep and Chase Out of
Hole with 420 bbls, 8.3 bpm at 1800 psi.
Establish Parameters P I U Wt = 175,000 Ibs, S /0 Wt =
152,000 Ibs, Rot Wt = 162,000 Ibs at 70 rpm's and 4,000 ft-Ibs
torque. Circulate at 5 bpm at 780 psi. Wash and Ream Down
to Top of Fas-Drill Plug at 9746'. Mill Fas-Drill Plug wI 2,000
Ibs WOM, 70 rpm's and 5,000 - 6,000 ft-Ibs torque. Milled on
Plug for 10 minutes then lost WOM and Circulation. Wash and
Ream another 7' (-9753') down and Tag Up on Plug again.
Mill on Plug wI 5,000 Ibs WOM, 70 rpm's and 5,000 - 7,000
ft-Ibs torque. Pump Rate at 2.0 bpm and 30 psi due to Loss of
Circulation. Mill less than 1 foot and break through. Wash and
Ream the remaining length of joint of DP cleanly. P I U and
Wash and Ream entire interval again.
RUNCMP P / U 2 Joints of DP and RIH to engage Top of Tubing Stub w/
Over Shot Assy. Tag up at 9720'. Wash and Ream over
Tubing Stub 7 feet wI 3,000 WOM, 50 rpm's and 6,000 ft-Ibs
torque, 2 bpm at 30 psi. Repeat 2 times. Try to Swallow
Tubing Stub wI 0 Rotation and Circulation - Will not go over.
Wash and Ream over Stub 2 more time. Try to Swallow
Tubing Stub w / 0 Rotation and Circulation again - Will not go
over. Put Slight Rotation in Sting and 0 / S Swallows Stub
Easliy. Lost Approx. 120 bbls During Milling Operations.
B I 0 and Blow Down Top Drive.
POOH and LID 4" DP. Pumped Double Displacement While
POOH.
POOH, B I 0 and LID BHA. C I 0 4" DP Handling Equipment
f/2-7/8" Handling Equipment. B / 0 and L /02-7/8" DP.
R / D 2-7/8" DP and BHA Handling Equipment. Cleared and
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-40
F-40
WORKOVER
DOYON DRILLING INC.
DOYON 16
Date From- To Hours Task Code NPT Phase
6/17/2005 01 :30 - 02:00 0.50 CLEAN P DECOMP
02:00 - 02:30 0.50 CLEAN P DECOMP
02:30 - 10:30 8.00 CLEAN P DECaMP
10:30 - 12:00 1.50 CLEAN P DECaMP
12:00 - 13:00 1.00 RUNCOI\IP RUNCMP
13:00 - 14:00 1.00 RUNCOMP RUNCMP
14:00 - 15:00 1.00 RUNCOrvP RUNCMP
15:00 - 00:00 9.00 RUNCOMP RUNCMP
6/18/2005 00:00 - 03:30 3.50 RUNCOMP RUNCMP
03:30 - 04:00 0.50 RUNCOMP RUNCMP
04:00 - 04:30
0.50 RUNCOtvP
04:30 - 06:00 1.50 RUNCOrvP RUNCMP
06:00 - 10:00 4.00 RUNCOrvP RUNCMP
10:00 - 11 :30 1.50 RUNCOrvP RUNCMP
11 :30 - 12:00 0.50 RUNCOí RUNCMP
I
Page 3 of 4
Start: 6/14/2005
Rig Release: 6/18/2005
Rig Number:
Spud Date: 10/26/1991
End: 6/18/2005
Description of Operations
Printed: 6/20/2005 11:10:20 AM
I iLL'
)
)
BP EXPLORATION
Operations Summary Report
Page 4 of 4
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-40
F-40
WORKOVER
DOYON DRILLING INC.
DOYON 16
Start: 6/14/2005
Rig Release: 6/18/2005
Rig Number:
Spud Date: 10/26/1991
End: 6/18/2005
Date From - To Hours Task Code NPT Phase
6/18/2005 11 :30 - 12:00 0.50 RUNCOMP RUNCMP
12:00 - 12:30 0.50 WHSUR P RUNCMP
12:30 - 14:30 2.00 BOPSUP P RUNCMP
Description of Operations
14:30 - 17:30 3.00 WHSUR P RUNCMP
17:30 - 18:30 1.00 WHSUR P RUNCMP
18:30 - 20:00 1.50 WHSUR P RUNCMP
Cleaned Rig Floor. M / U Retrieving Tool to DP. Latched and
Pulled Wear Bushing.
Held PJSM. R I U 4-1/2" 13Cr Handling Equipment, R I U
Compensator and Torque Equipment.
M / U 4-1/2" 12.6# 13Cr80 Fox Tail Pipe Assembly: 6.50" x
4.650" Unique Overshot - 1 Jt 4-1/2" 12.6# 13Cr80 Fox Tubing
- Lower X Nipple Assy w/ RHC-M Sleeve - 1 Jt 4-1/2" 12.6#
13Cr80 Fox Tubing - 7-5/8" x 4-1/2" Baker S-3 Packer Assy-
Upper X Nipple Assy. Bakerlocked All Connections Below
Packer. PI U All Assy's wI Compensator, Torque Turned All
Connections. M I U Torque 4,200 ft Ilbs. Doped Connections
Above Packer wI Jet Lube Seal Guard.
RIH wI 4-1/2" 12.6# 13Cr80 Fox Tubing. PI U Joints w/
Compensator, Torque Turned All Connections. M I U Torque
4,200 ft Ilbs. Doped Connections wI Jet Lube Seal Guard.
R I U DSM Lubricator Pulled TWC, RID DSM. R I U Little
Red to Pump Down 7-5/8" x 4-1/2" Annulus.
Held PJSM. Pressure Tested Lines to 3,200 psi. Freeze
Protected Well bore to
2,200' with 120 bbls of Diesel, Pumped Down IA and Took
Returns Up Tbg to Slop Tank. Pump Rate 2.75 bpm, 1200 psi.
20:00 - 21 :00
21 :00 - 22:00
22:00 - 00:00
1.00 WHSUR P
1.00 WHSUR P
2.00 WHSUR P
RUNCMP Shut Down Pump and U-Tube Diesel.
RUNCMP RID U-Tube Hose and Set BPV. Test BPV to 1000 psi.
RUNCMP B / D Lines and RID Little Red. RID Secondary Annulus and
Install Tree Gauges. Secure Well and Cellar. Rig Released at
00:00 Hrs.
Printed: 6/20/2005 1 1 : 1 0:20 AM
) )
F-40 COMPLETION
TREE = 4-1/16" 5MCIW
WELLHËAD = 11" 5M FMC
ACTUA TOR = BAKER
KB. ElEV = 67.43'
BF.'aèi = 38.43'
KOP = 3200'
. ,
Max Angle = 47 @ 6032'
Datum M[):: ·····1 ()436'
Datum TVD = 8800' SS
110-3/4" CSG, 45.5#, L-80/K-55, ID = 9.953" 1-1
2679' ~
9576' 1-1 4-1/2" X NIP, ID = 3.813"
9600' 1-1 7-5/8" x 4-1/2" BAKER S-3 A<R
9718' 1-1 UNIQUE MACHINE OVERSHOT
L
Minimum ID = 3.725" @ 9755' :8: ~
4-1/2" PARKER SWN NIPPLE
I I
1 TOP OF 5-1/2" CHROMELNR l-i 9762' 1-1 IT
14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 1-1 9767' 1
17-5/8" CSG, 29.7#, ID = 6.875" 1-1 10012' --41 ..
PERFORA TION SUMMARY
REF LOG: ATLAS BHCS ON 11/12/91
ANGLE AT TOP PERF: 45 @ 10616'
Note: Refer to A-oduction DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 12 10616 - 10640 0 09/03/94
3-3/8" 4 10640 - 10642 0 07/18/97
3-3/8" 4 10648 - 10696 0 12/04/91
3-3/8" 4 10648 - 10658 0 01/05/92
3-3/8" 4 10648 - 10674 0 01/30/96
I
I
I
I
1 PBTD H 10790' I ..
15-1/2" LNR, 17#, 13-CR, FL4S, .0232 bpI. ID = 4.892" H 10878' ~
DATE REV BY COMMENTS DATE REV BY
11/16/91 ORIGINAL COMPLETION
07/18/01 RN1TP CORRECTIONS
07/13/03 CMOITLP MAX ANGLE CORRECTION
10/27/03 KEY ITLP ÆRF CORRECTlONS/LOCA TIOt\
06/12/04 CMQ/PAG ÆRF CORRECTIONS
COMMENTS
2119' 1-14-1/2" X NIP, ID = 3.813"
14-1/2" TBG. 12.6#, 13Cr, .0152 bpf, ID = 3.958" I
GAS LIFT MANDR8...S
DEV TV PE VL V LATCH PORT
7 KBG2-1~ DCR B8<
43 KBG2-1 F DMY BK
39 KBG2-1 R DMY BK
34 KBG2-1 F DMY BK
43 KBG2-1F DMY BK
~
ST MD TVD
5 3092 3091
4 5340 4989
3 7023 6196
2 8267 7190
1 9508 8185
DATE
9665' 1-14-1/2" X NIP, ID = 3.813"
9719' 1-14-1/2" SWS PARKER NIP, ID = 3.813" 1
9729' l-i RIGHT HAND R8...EASE LATCH BAKER K-22 1
9730' 1-17-5/8" X 4-1/2" BAKER SABL-3 A<R, ID = 4.00" 1
9755' 1-i4-1/2" PARKER SWN NIP, ID = 3.725" 1
9767' 1-i4-1/2" PARKER WLEG 1
9754' l-i ELMD TT LOGGED 12/03/91
PRUDHOE BAY UNIT
WELL: F-40
ÆRMIT No: 1911170
API No: 50-029-22215-00
SEC 2, T11 N, R13E, 3005' FNL & 2884' FEL
BP Exploration (Alaska)
F-40 (PTD #1911170) Classified as Problem Well
)
Subject: F-40 (PTD #1911170) Classified as Problem Well
From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>
Date: Sun, 12 Sep 2004 20:37:46 -0800 .. .
To.::: "Golden, Johnny 0 (PHILLIPS ALASKA, INC. (PAI)" <goldjo@BP.com>, "GPB, Fld TL"
<GPBFldTL@BP.com>; "Rossberg,.RSteven" <RossbeRS@BP.coln>,''NSU~ ADW.Well .
Op¥rations'Supervisor" <NSUADWWellOperationsSupervisor@BP.com>, "GPB,.Wells Opt Eng"
<GPBWellsOptEng@BP.com>, "AOGCC Jim Regg(E-mail)..<Ji~_regg@ad~in~state.ak.us>. .
"AOGCC Winton Aubert'(E-maìl)" <winton_aubert@admin~state"ak.us>, "NSU',.ADW'WL.&. .
Completion Supervisor".<NSUADWWL&CompletionSupervisor@}3P.com>, "GPB; Well Pads..
DFG"'<GPBWellPadsDFG@BP.com>, "Kindred, David'M" <David.Kil1dred@BP.com>,~"Lawlar,
Clark on <LAWLARCG@BP.con1>'. '. ". . . ."'.. .. . .' ...
CC: "NSU, AD W Well Integrity Engineer" <NSU ADWW ellIntegrityEngineer@BP.com>, "Reev~s,
DonaldF"<ReevesDf@BP.com>, "Anders; Joe L'.' <anders22@BP.coni> . .. . .
)
All,
Well F-40 (PTD #1911170) has been found to have sustained casing pressure on the
IA. The TIO's on 09/12/04 were 2420/2280/200. A TIFL Failed on 09/12/04.
The plan forward for this well is as follows:
1. DHD: TIFL - FAILED
2. SL: GLV c/o
3. DHD: Re-TIFL
A wellbore schematic has been included for reference.
«F-40.pdf»
The well has been classified as a Problem well and may be produced until
communication is resolved. Please call if you have any questions.
Thank you,
Anna Dube
Well Integrity Coordinator
GPB Wells Group
Phone: (907) 659-5102
Pager: (907) 659-5100 xl154
Content-Description: F-40.pdf
Content-Type: application/octet-stream
Content-Encoding: base64
SC,ANNED NOV n 2 2004
1 of 1
9/14/20049:56 AM
MEMORANDUM
TO:
THRU:
State of Alaska
Alaska Oil and Gas Conservation Commission
Julie Heusser, DATE: March 27, 2001
Commissioner ~
Tom Maunder,
P. I. Supervisor ~ o, Alcr~-~
FROM: Jeff Jones, SUBJECT:
Petroleum Inspector
Safety Valve Tests
Prudhoe Bay Unit
BPX / F-Pad
March 2.7, 200t' I traveled to BPX's F-Pad in the Prudhoe Bay Field to witness
Safety Valve System tests.
Merv Liddelow, BPX representative in charge of testing, performed the tests in a
safe and proficient manner. Of the 24 wells tested, 13 failures were witnessed.
Wells F-01 and F-15 were shut in pending repairs. Mr. Liddelow indicated to me
that all other failures had been corrected and successfully re-tested within 24
hours. The AOGCC test report is attached for reference.
I conducted 24 well house inspections concurrent with the SVS tests, with no
exceptions noted.
s.U. MMARY; I witnessed SVS tests and conducted well house inspections on
BPX's F-Pad in the Prudhoe Bay Field.
24 wells, 48 components tested, 13 failures. 27.08% failure rate..
24 well house inspections conducted.
Attachments: SVS PBU F Pad 3-27-01 JJ
CC:
NON4gONFIDENTIAL
SVS PBU F Pad 3-27-01 JJ
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: Merv Liddelow
AOGCC Rep: Jeff Jones
Submitted By: Jeff Jones
Field/Unit/Pad: PBF/PBU/F-Pad
Separator psi: LPS 153
Date: 3/27/01
HPS 650
.ii i i i i i i ii i i i .
Well Permit Separ Set L/P Test Test Test Date off, WAG, GIN&
Number Number PSI PSI Trip Code ..C.ode Code Passed G~ or C¥CL~
F-01 ~700460 650 550 490 P 5 O~L
F-02 ' '1700560 " 650~ 550 530; P " P .... OIL
F-03 '1~00580 .....
, ....
F-04 1710020
F-05 'i710090 650, '"~50 '~30' i 4 ' OIL
F-06 ....1710120 .... ' ....
~-07 1720230: ' '
F2o8 1740110
F-09 'i790760 650 '556 '540 P 4 OIL
F-10A '2000670 .........
F-11A " '5000620' 6~0 ' '55.0 ' 516' P '4 ' OIL
F-12 'i7910q6' 650 ''550 530 P P -" OiL
F-13A 1961520 650 550 530 P '"4' OIL
F-14. 1800120 .. I , ,,
F-15 1811300 650 550 480 3 P OIL
F-16A 1961600 650 550 410 P P ' OIL
F-17A '" 1~41630 153 125 130 P 'P OiL
F-19 1811060 ' I ..........
F-21 1890560 . 153 '125 ' 115 P 'P .... 0IL
F-22 1'890620 650 550 0 2 P OIL
:F-23A 1'990740 153 125 0 2 P ..... 0ILi
F-24 ..... 1831540 ........
F-26A 1981890
F_27 ' i8616~b ..........
F-28 1861590
F-29 i861330 .......
F-30 1891100
F'31 1861570 650 550 0 2 P .... oIL
F-32 '1890330 "' 656' ~50 '530 'e e '
F.~3 " 1960030 ....
F-34A 1961090i
F-35 "' 188081~' '650' 550 i80 e 'P ~ " OIL
F-36 " 195i~60 1~3 " 125 0 2 P ..... OIL
F-37 " 1890~90 650 '550 530. e P " ' OIL
i ,,
RJF 1/16/01 Page 1 of 2 SVS PBU F Pad 3-27-01 JJ1
Well Pemit Separ Set L~ Test T~t Test Date oil WAG, G~J,
Number Number PSI. PSI .T~p Code Code Code Passed GAS or CVC~
F-38 ~90~350 ......
F-39 ~90~4~0 ~53 ~25 ~5 P P OiL
, , ,
F~0~ . _ :::~:~)..~ ~ 1911170 650 550] 550 P P OIL
F~4I ....... 1911040 "
650'5so 490 P P 0~
F-42 ~,90~SS0~ 6S0 SS0~530'~ 'P P OiL
F-43 , 1910750 , ~S3 ~250 ~ P ' O~L
F-44 1910080 ....
F-45 ~9~02~0 '
F-46 1901780 650 550 440 3 P ' OIL
~-47~ 2000350
~'-4s ~9~Os~o ,
i ,
,,
,
Wells: 24 Components: 48 Failures: 13 Failure Rate:
Remarks:
F-l, F-15 shut-in, 9perator reports that all other failures repaired and passed retest.
RJF 1/16/01 Page 2 of 2 SVS PBU F Pad 3-27-01 JJ1
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
Julie Heusser,
COmmissioner
DATE:
December 7, 2000
THRU:
Tom MaUnder, ,,~~o,~'-~
P. I. Supervisor ~.~.~,~
FROM':
jeff Jones,
Petroleum Inspector
SUBJECT:
Safety Valve Tests
Prudhoe Bay Unit
BPX / F-Pad
Thursday, December 7, 2000: I traveled to BPX's F-Pad in the Prudhoe Bay'
Field to witness Safety Valve System tests.
Merv Liddelow, BPX representative in charge of testing, performed the tests in a
safe and proficient manner. Of the 28 wells tested, 10 failures were witnessed.
For the most part, frozen contaminants (water) in the block valves upstream of
the pilots and in the SSV hydraulic control lines caused the failures. On 12/8/00
Mr. Liddelow indicated to me that ail SVS failures had been corrected and
successfully m-tested. The 17.~% SVS failure rate requires a 90-day: test cycle
for this pad. The AOGCC test report is attached for reference.
I conducted 28 well house inspections concurrent with the SVS tests. Due to
recent high winds, several well houses were drifted with snow inside. In addition,
SVS hydraulic fluid leaks were noted on wells F-12 and F-13A. Mr. Liddelow
indicated that these items would be addressed. No other exceptions were noted.
suMMARY: I witneSsed SVS tests and conducted well house inspections on
BPX's F-Pad in the Prudhoe Bay Field. 17.8% failure rate = 90 day test cycle.
28 wells, 56 components tested. 10 failures. 17.8% failure rate.
28 well house inspections conddcted.
Attachments· SVS PBU F Pad 12-7-00 JJ
CC:
NON-CONFIDENTIAL
SVS PBU F Pad 12-7-00 JJ.doc
Alaska Oil and Gas ConserVation Commission
Safety Valve System Test Report
Operator: BPX Submitted By: Jeff Jones
Operator Rep: Merv Lid&low Field/Unit/Pad: PBF/PBU/F Pad
AOGCC Rep: Jeff Jones Separator psi: LPS 156
Date: 12/7/00
HPS 828
Well Permit Separ Set L/P Test Test Test Date
Oil, WAG, GIN J,
NUmber Number PSI PSI Trip Code Code Code Passed GAS or CYCLE
F-01 1700460 828 550 525 P P OIL
F-02 1700560 828 550 500 P P OIL
F-03 1700580
F-04 1710020 156 125 125 P P OIL
F-05 1710090~
F-06 1710120!
F-07 1720230i
F-08 1740110
F-09 1790760
F-10A 2000670
F-11A 2000620 828 550 500 P P OIL
F-12 1791070 828 550 550 P P OIL
F-13A 1961520 828 550 525 P P OIL
~F-14 1800120
F-15 1811300 828 550 490 P P OIL
F-16A 1961600 156 125i 0 1 P OIL
F-17A 1941630 156 125 130 P P OIL
F-19 1811060
F'21 1890560 156 125 125 P P OIL
F-22 1890620 156 125 125 P P OIL
F-23A 1990740 156 125 125 P P OIL
F-24 1831540
F~26A 1981890 156 125 125 P 4 OIL
F-27 1861690 828 550 0 1 P OIL
F-28 1861590 828 550 500 P P OIL
F-29 1861330 828 550~ 250 3 4 OIL
F-30 1891100
F-31 1861570
F-32 1890330 828 550 520. P P OIL
F-33 1960030
F-34A 1961090
F-35 1880810 828 550 525 P P OIL
F-36 1951960 828 550 0 2 P OIL
F-37 1890990 828 550 550 P P OIL
12/13/00 Page 1 of 2 SVS PBU F Pad 12-7-00 JJ.xls
Well Permit Separ Set L/P Test Test Test Date
Oil, WAG, GIN J,
Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE
F-38 1901350
F-39 1901410 156 125 125 P P OIL
IF-40 1911170 828 ' 550 0 1 5 OIL
~F-41 1911040 828 550 530 P P OIL
F-42 1901580
F-43 1910750 156 125 125 P P OIL
iF-44 1910080
lF-45 1910280 828 550 0 1 P OIL
!F-46 1901780 828 550 50 3 P OIL
iF-47A 2000350 156 125 130 P P OIL
iF-48 1910860 156 125 100 P P OIL
Wells: 28 Components: 56 Failures: 10 Failure Rate: 17.8%[~ 9o var
Remarks:
12/13/00
Page 2 of 2
SVS PBU F Pad 12-7-00 JJ.xls
THE MATER/AL UNDER THIS COVF, R HAS BEEN
MICROFILMED
ON OR BEFORE
NOVEMBER 2, 2000
P L
M ATE R IA 1~
THIS M A
E
E
U N
R K E
E W
D E
R
R
ALAS!.--'.~-OIL AND GAS CONSERVATION COMMISSIC
REPORT C. SUNDRY WELL OPE ,ATIONS
1. Operations performed: Operation shutdown__
Stimulate ;x' Plugging__ Perforate
Pull tubing Alter casing __ Repair well Other__
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchoraae, Alaska 99519-6612
4. Location of well at surface
3005'SNL,2884'WEL,SEC. 02, T11N, R13E.
At top of productive interval
2000 FNL,4900 FEL,SEC. 11.T11N, R13E
At effective depth
1827'SNL,5111WEL,SEC. 11. T11N, R13E
At total depth
1882'SNL,5139'WEL, SEC. 11, T11N, R13E
5. Type of Well: '~.
Development _L_~'
Exploratory __
Stratigraphic ~
Service ~
6. Datum elevation (DF or KB)
KBE=~7.43
7. Unit or Property name
Prudhoe Bay Unit
feet
8. Well number
F-40(12o 11-11-13)
9. Permit number/approval number
91-117 /
10. APl number
50-029-22215
11. Field/Pool
Prudhoe Off Pool
12. Present well condition summary
Total depth: measured 10878
true vertical 9116
Effective depth: measured 10790
true vertical 9053
Casing Length Size
Structural .-
Conductor 110' 20"
Surface 2655' 10-3/4"
Intermediate 9983' 7-5/8'
Production --
Liner 1111' 5-1/2"
feet Plugs (measured)
feet
feet Junk (measured)
feet
Cemented Measured depth True vertical depth
BKB
139 139
2435 cu. ft. Class G 2684 2683
1501 cu. ft. Class G 10012 8552
210 cu. ft. Class G 9767-10878
Perforation depth: measured
10616'- 10620~ 10620'- 10638'; 10638'- 10640~ 10640'- 10642~ 10648'- 10658~' 10658' - 10696'
true vertica§ubsea 8929'-8932~ 8932'-8944~ 8944'-8946'; 8946'-8947'; 8951 '-8958'; 8958'- 8985:' .... .,.~
Tubing (size, grade, and measured depth)4.5 @9762'
Packers and SSSV (type and measured depthS730' SSSV ¢2103
13. Stimulation or cement squeeze summar~6'ee Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
26 723 4 1620
1935 4369 126 1140
Tubing Pressure
267
371
15. Attachments I 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations I Oilx Gas Suspended
17. I hereb~y~ert~ thatChe forC/¢ing is true and ..eCrect to the best of my knowledge,
~ i /7 / /'/ , --c
_Signed /?////./~,¢ / ?~4.4 ~.,'~./¢Z~ TitleTechnicalAssistant///
Form 10-404 R~,v 06/1~/8~' "- - -
Service
Date/ /
SUBMIT IN DUPLICATE
F-40
DESCRIPTION OF WORK COMPLETED
Stimulation Operation
0W1W97
A Tubing Acid Wash Treatment was performed using the
following fluids:
SUMMARY
Tubing flushed with 80 BBL's of 180 degree diesel. POP'd well with 1.0 gas lift
rate after soaking for 1 hour and 58 minutes.
Fluids Pumped
BBLS. Description
80 Diesel
REPERF
07/18/97
SUMMARY
The following interval were reperforated using 3 3/8" guns, 4 SPF, random
orientation and 60° phasing.
10618' - 10642' MD
i SKA OIL AND GAS CONSERVATION COMMI 3N
REPOR'! OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate Plugging
Pull tubing Alter casing Repair well
Perforate
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3005'SNL,2884'WEL, SEC. 02, T11N, R 13E.
At top of productive interval
2000 FNL, 4900 FEL, SEC. 11.T11N, R13E
At effective depth
1827'SNL,5111WEL,SEC. 11. T11N, R13E
At total depth
1882'SNL, 5139'WEL, SEC. 11, T11N, R13E
12. Present well condition summary
Total depth:
Effective depth:
measured 10878 feet
true vertical 9116 feet
measured 10790 feet
true vertical 9053 feet
5. Type of Well:
Development X
Exploratory .
Stratigraphic
Service.
Plugs (measured)
Junk (measured)
6. Datum elevation (DF or KB)
KBE=67.43 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
F-4o(12-11-11-13)
9. Permit number/approval number
91-117 /
10. APl number
50- 029-22215
11. Field/Pool
Prudhoe 0/I Pool
Casing Length Size Cemented
Structural --
Conductor 110' 20"
Surface 2655' 10-3/ 2435 cu. ft. Class G
Intermediate 9983' 7-5/8" 1501 cu. ft. Class G
Production --
Liner 1111' 5-1/2" 210 cu. ft. Class G
Perforation depth: measured 10658'- 10696'
Measured depth
139
2684
1OO12
9767-10878
True vertical depth
BKB
139
2683
8552
8373-9178
true vert'ical subsea8958'- 8985'
RECEIVED
Tubing (size, grade, and measured depth) 4.5 @9762'
Packers and SSSV (type and measured depth) 9730'SSSV @2103
MAY - 9 1995
.0il & Gas Cons. Commission
.,
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
,
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations..
Representative Dally Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure
20 723 4 1620
1935 4369 126 1140
Tubing Pressum
267
371
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby?ertify that the fo, gr, e~.,ingJs-¥.ue and correct to the best of my knowledge.
Signed ~ ,~ ¢t/'LJ-U~ Title Senior TechnicalAssbtant II
Form 10-40~, Re{/06/15/88 '~-/ ' '
Date ,~X'/d~'//~'~m.~ i
SUBMIT IN DdPL'I'CATE
WELL F-40(12-11-11-13)
Addperf
9/03/94
The following additional interval were perforated using 3 3/8"
guns, 6 SPF, random orientation and 60° phasing.
10616-10640"MD
RECEIVED
~AY -9 1995
A!aska Oil & Gas Cons. Commission
Anchor~ '
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 12 September 1994
RE: , Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
~ ~ ,~Q-07 (12-14-11-13)
1~6 (31-02-11-12)
DESCRIPTION
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
Run # 1
Run # 1
1 PL/PROFILE FINAL BL
1 PL/PROFILE RF SEPIA
ECC No.
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
1991.04
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
Run ~ 1 2013.05
Run # 1
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
Run # 1
Run # 1
Run # 1
Run ~ 1
5201.01
5735.03
C-06 (30-11-14) /,~ 1 PDK/BORAX FINAL BL Run # 1 6221.01
1
Plea
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Received by: ua~e:
Run # 1 6074.07
Run # 1
iNDiVIDUAL WELL GEOLOGICAL INVENTORY REPORT
PERMIT DATA DETAIL
91-117 BHC/GR
91-117 CNL/GR
91-117 DIFL/GR
91-117 GR/CCL
91-117 PERF
91-117 PERF
91-117 PERF
91-117 SSTVD
91-117 407
91-117
DAILY WELL OP
91-117 SURVEY
91-117 SURVEY
91-117 SURVEY
91-117 5144
R1,2&5",10004-10840
RI,2&5",7700-10811
R1,2&5",10004-10868
R1~5",9468-10768
5",9675-10654
R1,5",10700-10790
R1,5",9560-I0680
1&2",10004-10868
COMP DATE:12/4/91
10/27/91-11/17/91
MAGNETIC SINGLE SHOT
MWD
SS DIRECTIONAL
OH-DIFL,7658-10915
SUMMARY
Are well tests required?
Was well cored? Yes~
if yes, was the core analysis & description received?
Are dry ditch samples req~~d?
WELL IS IN COMPLIANCE.
INITIAL
Yes
11/15/1993
PAGE: 1
COMMENTS:
STATE OF ALASKA
Al_ ,,..,,A OIL AND GAS CONSERVATION COMMISSI,..,, . ....... ~
REPORT OF SUNDRY WELL OPERATIONS
Perforate X
I
Other
6. Datum elevation (DFKBE=67.4~3.~.f~etOr
1. Operations performed: Operation shutdown
Pull tubing
2. Name of Operator
BP Exploration (Alaska) Inc.
Stimulate X Plugging
Alter casing Repair well
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
7. Unit or Property name
Prudhoe Bay Unit
4. Location of well at surface
3005'SNL,2884'WEL, SEC. 02, T11 N, R 13E.
At top of productive interval
2000 FNL, 4900 FEL, SEC. 11.T11N, R13E
At effective depth
1827'SNL, 5111WEL, SEC. 11. T11N, R13E
At total depth
1882'SNL, 5139'WEL, SEC. 11, T11N, R13E
"12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10878 feet Plugs (measured)
9116 feet
10790 feet Junk (measured)
9053 feet
8. Well number
F-40(12-11-11-13)
9. Permit number/approval number
91-117 /
10. APl number
50- 029-22215
11. Field/Pool
Prudhoe Oil Pool
Casing Length Size Cemented
Structural --
Conductor 110' 20"
Surface 2655' 10-3/ 2435 cu. ft. Class G
Intermediate 9983' 7-5/8" 1501 cu. ft. Class G
Production --
Liner 1111' 5-1/2" 210 cu. ft. Class G
Perforation depth: measured 10658'- 10696'
Measured depth
139
2684
10012
9767-10878
True vertical depth
BKB
139
2683
8552
8373-9178
truevertical subsea8958'- 8985'
Tubing (size, grade, and measured depth) 4.5 @9762'
Packers and SSSV (type and measured depth) 9730' SSSV @2103
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure
SI
2130
Tubing Pressure
4280 427 0 455
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations .
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby cgrtify that the foregoing.is true and correct to the best of my knowledge.
S ig n e d ¢~,,,"fd/~_-6~// ~//~ i~f,:'~ Title Senior TechnicalAssistantl
·
Form 10-4~-4~ Rkv 06/15/88 / -
Date
SUBMIT IN DIj'PLI~AT~
1/05/92
1/20/92
2/28/92
4/18/92
WELL F-40 ( 12-11-11-13 )
Addoerf/HCL
--
The following interval were added perforation using 3 3/8" guns, 4 SPF,
random orientation and 60°/120° phasing.
10648' - 10658'MD
A HCL ACID was performed using the following fluids:
2000 bbls 1 2% HCL and Additives.
4000 bbls 6% HCL/1.5%HF and Additives
4000 bbls 2% NH4CL and Additives
1 69 bbls to perfs
300 bbls RCN Ball Sealers 7/8" 1.1 SG.
The following interval were added perforation using 3 3/8" guns, 4 SPF,
random orientation and 60°/120°
10620'-10638'
A HCL ACID Treatment was performed using the following fluids:
108 bbls Xylene
24 bbls 7.5% HCL with Additives
24 bbls 6% HCL 1.5% HF with Additives
24 NH4CL
;)64 bbls SW
62 MEOH
fjh
4/28/93
,:---, STATE OF ALASKA
_KA OIL AND GAS CONSERVATION COMMI,
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate X Plugging
Pull tubing Alter casing __ Repair well
Perforate
Other~
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3005'SNL, 2884 'WEL, SEC. 02, T11 N, R 13E.
At top of productive interval
2000 FNL, 4900 FEL, SEC. 11. T11N, R 13E
At effective depth
1827'SNL,5111WEL, SEC. 11. T11N, R13E
At total depth
1882'SNL,5139'WEL, SEC. 11, T11N, R13E
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE=67. 43 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
F-40(12-11-11-13)
9. Permitnumbedapprovalnumber
91-117/
10. APInumber
50- 029-22215
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10878feet
9116feet
10790feet
9053feet
Casing Length Size
Structural --
Conductor 110' 20"
S u trace 2655' 10-3/4
Intermediate 9983' 7-5/8"
Production
Liner 1111' 5-1/2"
Perforation depth: measured 10658'- 10696'
Plugs (measured)
Junk (measured)
Cemented Measured depth True vedicaldepth
BKB
139 139
2435cu.~ Class G 2684 2683
1501 cu.& C/ass G 10012 8552
210 cu. ft. Class G 9767-10878 8373-9178
true vertical subsea8958'-8985'
Tubing (size, grade, and measured depth) 4.5 @9762'
Packers and SSSV (type and measured depth) 9730' SSSV@2103 Alaska Oil & Gas cn~s. C'J~[~iss[oQ
13. Stimulation orcementsqueezesummary 12/24/91HCL was periormed us/ng the fol/owfluids: '/~lchO[a.~l)'
InterVals treated (measured)
4000 Gals HCL Plus Additives and Ball Sealers
Treatment description including volumes used and final pressure 242 bbls Seawater Plus Surfactant
40 bbls H20 Into Peris
14.
Prior to well operation
Subsequent to operation
_Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Oasing Pressure Tubing Pressure
0 0 0 0 0
300 830 10 0 300
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations.
16. Status of well classification as:
Oil X Gas. Suspended.
Service
17. I hereby c~,tify that t,h,e f._~r~i~rg)is true and correct to the best of my knowledge.
-~ Title Senior Technical Assbtant I
Form 10-404 Rev 06/15/88 ~ / ' ~-
Date
SUBMIT IN [3'UPLI~ATE
BP EXPLORATION
Dear Sir or Madam;
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
We are sorry for any inconvenience that we have caused because of
the incorrect distribution.
From your notice, it appears that you need the data for well
F-40, so that is enclosed.
Call me at 564-4004 if you need any other information.
Sincerely,
Adrian J. Martin
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 03/10/92
T~ 83313
HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
H-08 ~-Z~ PERF 02/27/92 ~1
F-40 ~/-/~ PERF ~/--//7 02/28/92 #1
N-12 8/-/~ PERF 03/02/92 #1
F-41 ~/-/~PRODUCTION LOG 02/26/92 #1
E-10~/-/~ TDT-P 02/29/92 #1
~-,16 f_~-'~-_CBT 03/04/92 #1
X-17~/-~ PRODUCTION LOG 03/04/92 #1
Z-16 ~2-/~-. ULTRASONIC IMAGER
5 "
9100.00- 9432.00 SCH 5 "
9675.00-10654.00 SCH 5 "
9600.00- 9854.00 SCH 5 "
0.00-11561.00 SCH 5 "
11050.00-11727.00 SCH 5 "
7700.00-11'514.00 SCH 5 "
9390.00- 9812.00 SCH 5 "
03/04/92.~1 7700.00-11542.00 SCH
Information Control
Well Records
Adrian J. Martin
RECEIVED
A4AR 2 4 1992
Alaska Oil & C~as Cons. Commission
Anchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Stalus of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
BP Exploration 91-117
3. Address 8. APl Number
P. 0. Box 196612, Anchorage, Alaska 99519-6612 5o- 029-22215
4. Location of well at surface ~ .............. ._ 9. Unit or Lease Name
3005' SNL, 2884' WEL, SEC. 02, T11N, R13E. ~ ~-;~;~'"~';:~ ;~ ?,~..r_.! ~;:-%;'::;:-;~'~%t~r Prudhoe Bay Unit
~ ~b'~'~'~-''--'~::; ,f//,,~/-~" 11 Field and Pool
At
Total
Depth
- ' ...... ~'~'- ! Prudhoe Bay Field/Prudhoe Bay Pool
1882' SNL, 5139' WEL, SEC. 11, T11N, R13E.
5. Elevation in feet (indicate KB, DF, etc.) J6. Lease Designation and Serial No.
KBE 67.43' I ADL 28280
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions
10/26/91 11/11/91 12/4/91I feet MSL J ONE
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVDi 19. Directional Survey J20. Depth where SSSV set 121. Thickness of Permafrost
10878MD/9116'TVD 10790'MD/9053TVD YES D~ NO []I 2103feet MD I 1910'
22. Type Electric or Other Logs Run
DIL/BHCS/GR/CNL/SP
23. CASING, LINER AND CEMENTING RECORD
SE'l-rING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BO'I-rOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
10-3/4' 45.5# L-80/K-55 Surface 2684' 13-1/2" 2435 cu. ft. Arcticset II/111
7-5/8' 29.7# NT-95HS Surface 10012' 9-7/8" 1501 cu. ft. Class G
5-1/2' 17# 13CR FL4S 9767' 10878' 6-3/4" 210 cu. ft. Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBINGREC. ORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
Schlumberger 3-3/8 4spf 4-1/2" 9762' 9730'
MD TVD (SS) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
10658'- 10696' 8958'- 8985' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
12/4/91 I FIowin~7
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD II~
Flow Tubing Casing Pressure 3ALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE j~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
RECEIVED
~AR 1 0 !,992,
Alaska 0il & Gas Cons, ~om~ssto~-
Anchorage
Form 10-407
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
Submit in duplicate
29. 30.
GEOLOGIC MARKERS FURMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Sag 10012' 8479'
Shublik A 10053' 8509'
Zone 4 10129' 8564'
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~~~~'~)¢m~---''/,/_ TitlePBDDri//inaSuoervisor_ Date ~/~'~"~
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
jection,ltem 27: GasMeth°dlnjection,°f OperatiOn:Shut. in,FIowing,other, explain.Gas Lift, Rod Pump, Hydraulic Pump, S ubn~s~l~"" V~ale~)n~- - ~- ,.., ,.. , ~, ~, D
Item 28: If no cores taken, indicate "none".
MAR 1 0 1992
A~aska 0il & Gas Cons. Commission
Form 10-407 Anchorage
ACTIVITY SUMMARY
BP/AAI SHARED SERVICE
NORTH SLOPE AK
PRUDHOE BAY F-40
NABORS 18E
SURF DRIL: 16.0 SURV: 5.5 RIGS: 2.5
10/27/91 ( 2) DRILLING MW: 9.2 VIS:165
TD: 1190' (1190) ACCEPTED RIG @0800 HRS 10-26-91. SPUD WELL @1400 HRS
SUPV:BZJ 10-26-91. DRILLED TO 1118' TOH. CHANGED BIT. TIH.
HOLE ANGLE:42 0 DRILLED AND SURVEYED TO 119~'
DAILY:S75,543 CUM:$75,543 ETD:S75,543 EFC:$2,281,000
SURF DRIL: 15.5 TRIP: 6.5 SURV: 1.0 CIRC: 1.0
10/28/91 ( 3) SHORT TRIP MW:10.2 VIS:133
TD: 2699' ( 1509) DRILLED AND SURVEYED TO 2699'. TD 13-1/2" HOLE. CBU. SHORT
SUPV:BZJ TRIP TO 1473'.
HOLE ANGLE:42 0
DAILY:S39,964 CUM:$115,507 ETD:S115,507 EFC:$2,281,000
SURF TRIP: 2.0 CIRC: 1.5 CASG: 14.5 BOPE: 6.0
10/29/91 ( 4) TEST BOPE MW: 0.0 VIS: 0
TD: 2699' ( 0) TOH. RIG UP, RUN AND CEMENT 10-3/4" CASING. NU AND TEST
SUPV:BZJ BOPE.
HOLE ANGLE:42 0
DAILY:S207,614 CUM:$323,121 ETD:S323,121 EFC:$2,281,000
11/03/91 (9)
TD: 7700' ( 1125)
SUPV:GM
HOLE ANGLE:42 0
SURF DRIL: 8.5 TRIP: 9.0 BOPE: 1.5 PROB: 5.0 PROB CODE: EFS
10/30/91 ( 5) DRILLING MW: 8.9 VIS: 36
TD: 3262' ( 563) RU TO TEST BOP, INSTALL WEAR RING. PU BHA. RIH TO 2636',
SUPV:BZJ TEST CSG. JET & DRILL TO 2710', RU BALL MILL. DRILL & JET
HOLE ANGLE:42 0 TO 3262'.
DAILY:S29,989 CUM:$353,110 ETD:S353,110 EFC:$2,281,000
SURF DRIL: 15.0 TRIP: 9.0
10/31/91 ( 6) RIH W/PACKED BHA MW: 9.3 VIS: 44
TD: 4567' (1305) DRILLED TO 3851' PUMP PILL, POH. PU BHA & RIH. POH CNG BHA
SUPV:BZJ & RIH TO 4567'.
HOLE ANGLE:42 0
DAILY:S44,717 CUM:$397,827 ETD:S397,827 EFC:$2,281,000
SURF DRIL: 15.5 TRIP: 8.5
11/01/91 ( 7) RIH MW: 9.3 VIS: 40
TD: 5569' ( 1002) RIH, DRILLED TO 5569'. DROPPED SURVEY. POOH FOR BIT. P/U
SUPV:GM BHA & RIH.
HOLE ANGLE:42 0
DAILY:S64,019 CUM:$461,846 ETD:S461,846 EFC:$2,281,000
.
SURF DRIL: 17.0 TRIP: 6.5 BoPE: 0.5
11/02/91 ( 8) DRILLING MW: 9.4 VIS: 36
TD: 6575' ( 1006) RIH, DRILL TO 6043'. POOH CHG BHA. RU BHA & RIH, DRILL TO
SUPV:GM 6575'.
HOLE ANGLE:42 0
DAILY:S44,830 CUM:$506,676 ETD:S506,676 EFC:$2,281,000
SURF DRIL: 18.5 TRIP: 5.5
DRILLING MW: 9.5 VIS: 39
DRILL TO 6925' POH CHG BIT. PU BHA & RIH. DRILL TO
7700'.
DAILY:S36,163
CUM:$542,839 ETD:S542,839 EFC:$2,281,000
RECE ¥ E)
MAR 1 0 199
,,~iaska Oil & Gas Cons. Cornm~.ssi°r~
Anchorage
ACTIVITY SUMMARY
BP/AAI SHARED SERVICE
NORTH SLOPE AK
PRUDHOE BAY F-40
NABORS 18E
SURF DRIL: 12.0 TRIP: 11.0 OTHR: 1.0
11/04/91 (10) RIH MW: 9.6 VIS: 38
TD: 8103' ( 403) DRILL TO 7938'. POH LD BHA, RIH CUT DRILL LINE. RIH, SLIDE
SUPV:GM TO 8103'. PUMP PILL POOH, BUILD NEW BHA. RIH.
HOLE ANGLE:42 0
DAILY:S51,310 CUM:$594,149 ETD:S594,149 EFC:$2,281,000
SURF DRIL: 14.0 TRIP: 8.0 CIRC: 1.0 BOPE: 1.0
11/05/91 ( 11) DRILLING MW: 9.7 VIS: 40
TD: 8950' ( 847) RIH REAM MOTOR RUN TO 8103'. DRILL TO 8767'. POH, CHG BHA,
SUPV:GM RIH & BENCH MARK @ 5540'. RIH, DRILL TO 8950'.
HOLE ANGLE:42 0
DAILY:S73,656 CUM:$667,805 ETD:S667,805 EFC:$2,281,000
SURF DRIL: 9.0 TRIP: 3.5 OTHR: 1.0 PROB: 10.5 PROB CODE: WH
11/06/91 (12) TEST BOPE MW: 9.6 VIS: 37
TD: 9381' ( 431) DRILLED TO 9381'. POOH, CHG BHA, PU STORM PKR & SET. ND
SUPV:GM BOP'S & REMOVE WEAR BUSHING. NU BOPE, TEST.
.
HOLE ANGLE:42 0
DAILY:S71,066 CUM:$738,871 ETD:S738,871 EFC:$2,281,000
SURF DRIL: 13.0 TRIP: 3.0 BOPE: 8.0
11/07/91 (13) SLIDING W/MOTOR MW: 9.7 VIS: 36
TD: 9620' ( 239) TEST BOPE, PULL TEST PLUG. ND BOPE, REPLACE API RING.
SUPV:GM INSTALL WEAR RING, RIH. RETRIEVE STORM PKR, LD PKR. RIH W/DP
HOLE ANGLE:42 0 . DRILL TO 9620'.
DAILY:S47,522 CUM:$786,393 ETD:S786,393 EFC:$2,281,000
SURF DRIL: 13.5 TRIP: 8.0 CIRC: 1.5 BOPE: 1.0
11/08/91 (14) LD DC MW: 9.7 VIS: 38
TD:10022' ( 402) DRILLED TO 10022'. CIRC BOTTOMS UP, PUMP PILL. POOH, LD
SUPV:GM DRILL PIPE.
HOLE ANGLE:42 0
DAILY:S38,189 CUM:$824,582 ETD:S824,582 EFC:$2,281,000
SURF TRIP: 0.5 CASG: 20.5 BOPE: 1.0 OTHR: 2.0
11/09/91 (15) INSTALL WEAR BUSHING MW: 9.7 VIS: 38
TD:10022' ( 0) LD BHA, PULL WEAR RING. RRIH W/ CSG TO 10022' LANDED
SUPV:GM 7-5/8" CSG ON MANDREL HGR. CIRC.CSG VOLUME. CMT W/ 55 SX
HOLE ANGLE:42 0 'G' CMT @ 13.5 PPG, 130 SX 'G' CMT @ 15.6 PPRG. DISP W/
MUD. BUMP PLUG W/ 3000 PSI. L/D LAND JT. INSTALL & TEST
PACKOFF BUSHING. CHG RAMS IN BOP. CHG OUT KELLY. INSTALL
TEST PLUG.
DAILY:S284,432 CUM:$1,109,014 ETD:S1,109,014 EFC:$2,281,000
SURF DRIL: 9.0 TRIP: 12.0 CIRC: 1.0 CASG: 0.5 BOPE: 1.5
11/10/91 ( 16)
TD:10125' ( 103)
SUPV:GM
HOLE ANGLE:42 0
DRILLING MW: 8.9 VIS: 38
TEST RAMS, LD TEST PLUG, INSTALL WEAR RING. RIH. POOH CHANGE
BHA. RIH TAG FLOAT COLLAR @ 9890'. TEST 7-5/8" CASING TO
3000 PSI. DRILL OUT FLOAT EQUIP, CMT TO 10022' CBU & COND
MUD FOR PROJ INTERVAL. DRILLED TO 10125'
DAILY:S31,102 CUM:$1,140,116 ETD:S1,140,116 EFC:$2,281,000
RECEiVeD
MAR 1 0 t992
Alaska Oil .& Gas Cons. commission
:Anchorage
ACTIVITY SUMMARY
BP/AAI SHARED SERVICE
PRUDHOE BAY
NORTH SLOPE
F-40
AK
NABORS 18E
SURF DRIL: 14.5 TRIP: 7.5 SURV: 0.5 CIRC: 1.5
11/11/91 (17) DRILLING MW: 8.8 VIS: 36
TD:10503' ( 378) DRILLED TO 10481'. POOH CHG BHA & TIH. REAM & WASH TO
SUPV:GM BOTTOM. DRILL TO 10503'.
HOLE ANGLE:42 0
'DAILY:S55,546 CUM:$1,195,662 ETD:S1,195,662 EFC:$2,281,000
SURF DRIL: 20.0 TRIP: 2.5 CIRC: 1.5
11/12/91 (18) POOH FOR E-LOGS MW: 8.8 VIS: 38
TD:10880' ( 377) DRILLED TO 10880'. CIRC BOTTOMS UP, POOH FOR E-LOGS.
SUPV:GM
HOLE ANGLE:42 0
DAILY:S32,016 CUM:$1,227,678 ETD:S1,227,678 EFC:$2,281,000
SURF TRIP: 10.5 CIRC: 1.0 EVAL: 7.0 CASG: 5.5
11/13/91 (19) RIH W/5-1/2" FL4S 13CR LINER MW: 8.8 VIS: 39
TD:10880' ( 0) CONT POOH FOR LOGS. RU & RUN OPEN HOLE LOGS, POOH. RIH W/BHA
SUPV:GM CBU. POH LD BHA. RU, RUN 5-1/2" 13CR FL4S LINER.
HOLE ANGLE:42 0
DAILY:S71,264 CUM:$1,298,942 ETD:S1,298,942 EFC:$2,281,000
SURF CASG: 16.5 BOPE: 6.5 PROB: 1.0 PROB CODE: EFC
11/14/91 (20) CHANGE OUT TOP PIPE RAM BOP MW: 8.8 VIS: 35
TD:10880' ( 0) CIRC ONE LINER, RIH W/ LINER. CIRC & RECIP LINER @ 10880'
SUPV:GM RE-RIG CMT LINES DUE TO EQUIP FAILURE TO TEST. CMT LINER
HOLE ANGLE:42 0 W/DS. SET LINER, TOL HANGER. REL FRM HANGER, POH, RD CMT
EQUIP. POOH W/SET TOOL. ND & REPLACE DAMAGED PIPE RAM BODY
DAILY:S138,449 CUM:$1,437,391 ETD:S1,437,391 EFC:$2,281,000
SURF DRIL: 6.5
11/15/91 (21)
TD:10880' ( 0)
SUPV:GM
HOLE ANGLE:42 0
TRIP: 10.5 CIRC: 1.5 CASG: 0.5 BOPE: 5.0
WASH & DRL CMT STRINGERS MW: 8.8 VIS: 35
C/O TOP PIPE RAM BOP, INSTL RAMS IN LWR, TEST. MU BHA, RIH
TO 8905'. BREAK CIRC, RIH TAG CMT @ 9465'_ C/O CMT TO TOL,
CIRC, B/U. POH W/BIT & SCRAPER, M/U BHA, RIH, BRK CIRC,
DRILL 22' CMT, WASH & DRILL CMT STRINGERS TO 9950'.
DAILY:S46,996 CUM:$1,484,387 ETD:S1,484,387 EFC $2,281,000
SURF DRIL: 7.5
11/16/91 (22)
TD:10880' ( 0)
SUPV:GM
HOLE ANGLE:42 0
TRIP: 5.0 CIRC: 1.5 CASG: 1.0 OTHR: 9.0
RIH W/ POLISH MILL MW: 8.5 VIS: 26
WASH & DRL CMT TO 10793'. CIRC B/U. CLEAN MUD TANKS, DISPL
MUD W/SEAWATER. POH, MAKE-UP POLISH MILL & RIH ON 3~1/2"
DP.
DAILY:S27,766 CUM:$i,512;153 ETD:S1,512,153 EFC:$2,281,000
SURF DRIL: 1.0
11/17/91 (23)
TD:10880' ( 0)
SUPV:GM
HOLE ANGLE:42 0
TRIP: 3.0 CIRC: 1.5 BOPE: 1.0 OTHR: 17.5
CHG RAMS / ND BOPE MW: 8.5 VIS: 0
RIH W/POLISH MILL. REV CIRC. POH, LDDP, RU & RUN 4-1/2" TBG
COMP ASSY. RILDS.
DAILY:S30,828 CUM:$1,542,981 ETD:S1,542,981 EFC:$2,281,000
RECEIVED
ACTIVITY SUMMARY
BP/AAI SHARED SERVICE
NORTH SLOPE AK
PRUDHOE BAY
F-40
NABORS 18E
SURF OTHR: 24.0
11/17/91 (24)
TD:10880' ( 0)
SUPV:GM
HOLE ANGLE:42 0
CHG RAMS / ND BOPE MW: 0.0 VIS: 0
INSTALL RAMS ND BOPE. INSTL ADPTR FLANGE & TREE - TEST. RU &
DISPL TBG WITH 150BBL S/WATER, 248 BBL DIESEL. SET PKR.
INJECT EXCESS FLUIDS DN FOLLOWED BY 20 BBL DIESEL. RIG RLSD
@ 2030 HRS, 11-17-91.
DAILY:S30,828 CUM:$1,573,809 ETD:S1,542,981 EFC:$2,311,828
RECEJYED
1 0 199'
Alaska Oil & Gas Cons.
'Anchorage
me,eco OHfie~d Set:
6116 Nielson way
Anchorage, AK
99518
(907) 562-2646
Inc.
ORIGINAL
??-//?
TELECO MWD SURVEYS
WELL #F-40
TELECO JOB # 851TAK
Teleco appreciates the opportunity to provide our services. Please find attached a copy
of the directional surveys in each of the following formats:
· Measured Depth No Interpolation
· Measured Depth 100' Interpolated
· True Vertical Depth 100' Interpolated
RECEIVED
Alaska 0il & Gas Cons.
Anchora9e
A $~[~A'l' COMPANY
MEASURED DEPTH
NO INTERPOLATION
TELECO OILFIELD SEVICES INC
ALASKA
PRUDHOE BAY DRILLING
Well Name
Location
Date Surveyed
Job No.
Survey Performed By
: F40
: F-PAD
: PRUDHOE BAY
: NORTH SLOPE
: OCT 29, 1991
: 851TAK
: CRAIG TOMAYER
?his survey is correct to the best of my knowledge
.nd is supported by actual field data.
TELECO OILFIELD SEVICES INC
Client : PRUDHOE BAY DRILLING
Well Name : F40
Location : F-PAD
: PRUDHOE BAY
: NORTH SLOPE
No Interpolation
Date OCT 29, 1991
Filename : 851TAK
Plane of Vertical Section : 206.8°
Latitude & Departure relate to : SLOT CENTER
Vertical Section Originates at : SLOT CENTER
Slot Coordinates : Lat 0.000ft
_. : Dep 0.000ft
Directions Referenced To : TRUE NORTH
Depth at Drill Floor : 0.00 ft
Calculation Method
: MINIMUM CURVATURE
Magnetic Declination :+30° 0.000'E
Platform north : +0° 0' 0'' (T)
Grid convergence : +0.0000°
TELECO OILFIELD SEVICES INC
Client : PRUDHOE BAY DRILLING
Well Name : F40
Location : F-PAD
: PRUDHOE BAY
: NORTH SLOPE
No Interpolation
MD C~L INC DIR
ft ft deg deg
2487 0 0.5 159.0
2731 244 0.6 204.7
2824 93 1.6 212.5
2916 92 2.7 212.5
2997 81 4.1 206.8
_l
3089 92 7.3 199.5
3183 94 10.6 202.3
3277 94 13.4 203.7
3372 95 16.0 199.8
3465 93 17.6 199.1
TVD
ft
2486.9
2730.9
2823.9
2915.8
2996.7
3088.2
3181.0
3273.0
3364.9
3453.9
VS
ft
-0.4
1.6
3.4
6.8
11.6
20.7
35.2
54.7
78.7
105.4
3559 94 19.8 200.9
3653 94 22.0 199.1
3749 96 24.1 200.2
3827 78 25.9 201.6
3921 94 27.7 200.2
3542.9
3630.7
3719.1
3789.8
3873.7
135.3
168.6
205.9
238.7
280.8
4015 94 30.1 198.8
4109 94 31.8 199.5
4202 93 33.0 201.6
4297 95 34.8 201.2
4390 93 36.7 202.3
3956.0
4036.6
4115.1
4193.9
4269.4
325.9
373.8
423.3
476.0
530.2
4484 94 38.4 201.9
4571 87 40.3 200.9
4664 93 40.9 200.2
4756 92 41.5 200.9
4849 93 41.8 201.9
4343.9
4411.2
4481.8
4551.0
4620.5
587.2
642.2
702.3
762.6
824.1
4943 94 42.2 201.9
5036 93 41.3 203.7
5130 94 41.0 204.4
5224 94 41.1 205.0
5316 92 42.5 206.7
4690.4
4759.8
4830.6
4901.4
4970.0
886.7
948.5
1010.3
1072.0
1133.3
5411 95 43.1 207.3
5504 93 43.6 207.2
5598 94 44.2 205.7
5692 94 46.1 209.2
5784 92 46.6 209.8
5039.7
5107.4
5175.1
5241.4
5304.9
1197.8
1261.7
1326.8
1393.5
1460.0
5878 94 46.8 210.1
5972 94 47.5 211.4
6067 95 47.3 211.2
6161 94 46.8 211.3
6254 93 46.2 211.2
5369.4
5433.3
5497.6
5561.6
5625.7
1528.3
1597.0
1666.7
1735.3
1802.6
Page 1 of 3
Date OCT 29, 1991
Filename : 851TAK
LAT DEP D'LEG
ft ft °/100
-6.6 14.0 0.0
-8.8 13.8 0.2
-10.3 12.9 1.1
-13.2 11.1 1.2
-17.4 8.8 1.8
-25.9 5.3 3.6
-39.5 0.0 3.5
-57.5 -7.6 3.0
-79.9 -16.5 2.9
-105.2 -25.4 1.7
-133.5 -35.8 2.4
-165.0 -47.2 2.4
-200.4 -59.9 2.2
-231.2 -71.6 2.4
-270.8 -86.7 2.0
-313.6 -101.9 2.7
-359.3 -117.7 1.8
-405.9 -135.2 1.8
-455.3 -154.6 1.9
-505.7 -174.7 2.2
-558.8 -196.3 1.8
-610.2 -216.4 2.3
-666.8 -237.6 0.8
-723.6 -258.9 0.8
-781.1 -281.4 0.8
-839.5 -304.9 0.4
-896.6 -328.9 1.6
-953.1 -354.1 0.6
-1009.1 -379.9 0.4
-1064.3 -406.6 2.0
-1121.8 -435.9 0.8
-1178.6 -465.2 0.5
-1236.9 -494.2 1.3
-1296.0 -524.9 3.3
-1354.0 -557.7 0.7
-1413.2 -591.9 0.3
-1472.5 -627.1 1.3
-1532.2 -663.4 0.3
-1591.0 -699.1 0.5
-1648.7 -734.1 0.6
TELECO OILFIELD SEVICES INC
Client : PRUDHOE BAY DRILLING
Well Name : F40
Location : F-PAD
: PRUDHOE BAY
: NORTH SLOPE
No Interpolation
MD C~L INC DIR
ft ft deg deg
6348 94 45.6 210.9
6442 94 45.0 210.5
6535 93 43.8 210.3
6630 95 43.0 210.1
6724 94 41.8 210.5
Page 2 of 3
Date OCT 29, 1991
Filename : 851TAK
6820 96 40.1 210.0
6911 91 38.8 210.2
7001 90 38.9 210.2
7096 95 38.7 210.6
7189 93 38.4 210.6
TVD VS LAT DEP D'LEG
ft ft ft ft °/100
5691.1 1869.9 -1706.5 -768.9 0.7
5757.2 1936.6 -1764.0 -803.1 0.7
5823.6 2001.5 -1820.1 -836.0 1.3
5892.7 2066.7 -1876.5 -868.8 0.9
5962.1 2129.9 -1931.3 -900.8 1.3
2192.7
2250.5
2306.8
2366.2
2424.1
7283 94 38.3 210.6
7375 92 38.1 210.6
7466 91 37.7 210.3
7559 93 37.4 210.3
7654 95 37.3 210.6
6034.6
6104.8
6174.9
6249.0
6321.7
2482.3
2539.0
2594.8
2651.4
2708.9
7748 94 37.0 210.9
7842 94 36.6 210.9
7925 83 36.3 209.8
8031 106 35.9 204.7
8126 95 35.1 202.8
6395.4
6467.7
6539.5
6613.3
6688.8
2765.5
2821.7
2870.9
2933.3
2988.4
8220 94 34.1 205.0
8315 95 33.6 203.3
8409 94 32.9 204.5
8503 94 32.6 207.0
8597 94 33.7 208.2
6763.7
6839.0
6905.7
6991.4
7068.8
3041
3094
3146
3196
3248
.7
.6
.0
.9
.3
8692 95 34.5 210.1
8761 69 35.3 210.7
8854 93 35.9 211.8
8947 93 36.3 212.2
9043 96 37.7 212.2
7146.1
7225.0
7303.6
7382.7
7461.4
3301.5
3340.9
3394.8
3449.4
3506.9
9138 95 38.7 214.5
9230 92 39.4 216.5
9323 93 40.3 218.1
9411 88 41.8 217.1
9506 95 43.3 213.2
7540.1
7596.7
7672.3
7747.4
7824.1
3565
3622
3681
3737
3801
.3
.6
.2
.9
.5
9601 95 42.7 214.0
9696 95 43.9 210.5
9791 95 43.9 213.6
9885 94 43.2 217.2
9941 56 43.5 217.1
7898.7
7970.2
8041.6
8108.0
8178.0
3865
3930
3996
4060
4098
.8
.7
.2
.3
.1
8247.4
8316.6
8385.0
8453.2
8493.9
-1985.6
-2035.6
-2084.4
-2135.8
-2185.6
-2235.8
-2284.8
-2333.0
-2381.9
-2431.6
-932.5 1.8
-961.5 1.4
-989.9 0.1
-1020.0 0.3
-1049.5 0.3
-1079.2 0.1
-1108.2 0.2
-1136.5 0.5
-1165.1 0.3
-1194.3 0.2
-2959.3 -1464.0 1.4
-2993.3 -1483.9 1.3
-3039.6 -1512.0 0.9
-3086.1 -1541.1 0.5
-3135.0 -1571.8 1.5
-3184.0 -1604.2 1.8
-3231.2 -1637.8 1.6
-3278.6 -1673.9 1.5
-3324.4 -1709.2 1.9
-3376.9 -1746.1 3.2
-3430.9 -1782.0 0.9
-3486.0 -1816.7 2.8
-3541.8 -1851.7 2.3
-3594.6 -1889.2 2.7
-3625.2 -1912.4 0.5
-2726.0 -1349.6 1.7
-2774.3 -1371.2 1.1
-2821.4 -1392.1 1.0
-2867.2 -1414.2 1.5
-2912.8 -1438.0 1.4
-2480.4 -1223.3 0.4
-2528.7 -1252.2 0.4
-2571.3 -1277.2 0.9
-2626.8 -1305.7 2.9
-2677.2 -1328.0 1.4
TELECO OILFIELD SEVICES INC
Client : PRUDHOE BAY DRILLING
Well Name : F40
Location : F-PAD
: PRUDHOE BAY
: NORTH SLOPE
No Interpolation
Page 3 of 3
Date OCT 29, 1991
Filename : 851TAK
Origin of Bottom Hole Closure SLOT
Bottom Hole Closure 4099 ft 207.8°
MEASURED DEPTH
100' INTERPOLATED
TELECO OILFIELD SEVICES INC
ALASKA
PRUDHOE BAY DRILLING
Well Name
Location
Date Surveyed
Job No.
Survey Performed By
: F40
: F-PAD
: PRUDHOE BAY
: NORTH SLOPE
: OCT 29, 1991
: 851TAK
: CRAIG TOMAYER
~his survey is correct to the best of my knowledge
bnd is supported by actual field data.
COMPANY REPRESENTATIVE
TELECO OILFIELD SEVICES INC
Client : PRUDHOE BAY DRILLING
Well Name : F40
Location : F-PAD
: PRUDHOE BAY
: NORTH SLOPE
Date OCT 29, 1991
Filename : 851TAK
Interpolated 100 ft of MD
Plane of Vertical Section : 206.8°
Latitude & Departure relate to : SLOT CENTER
Vertical Section Originates at : SLOT CENTER
Slot Coordinates : Lat 0.000ft
_ : Dep 0.000ft
Directions Referenced To : TRUE NORTH
Depth at Drill Floor : 0.00 ft
Calculation Method
: MINIMUM CURVATURE
Magnetic Declination :+30° 0.000'E
Platform north : +0° 0' 0'' (T)
Grid convergence : +0.0000°
Client
Well Name
Location
TELECO OILFIELD SEVICES INC
: PRUDHOE BAY DRILLING
: F40
: F-PAD
: PRUDHOE BAY
: NORTH SLOPE
Page 1 of 2
Date OCT 29, 1991
Filename : 851TAK
Interpolated 100 ft of MD
MD
ft
2487
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
C\L INC DIR
ft deg deg
0 0.5 159.0
13 0.5 161.4
100 0.5 180.2
100 0.6 198.9
100 1.3 210.5
100 2.5 212.5
100 4.2 206.6
100 7.7 199.8
100 11.1 202.6
100 14.0 202.8
TVD
ft
2486.9
2499.9
2599.9
2699.9
2799.9
2899.8
2999.7
3099.1
3197.7
3295.2
100 16.5 199.6 3391.7
100 18.4 199.8 3487.0
100 20.8 200.1 3581.2
100 23.0 199.6 3674.0
100 25.3 201.1 3765.3
3900 100 27.3 200.5 3854.9
4000 100 29.7 199.0 3942.8
4100 100 31.6 199.4 4028.8
4200 100 33.0 201.6 4113.4
4300 100 34.9 201.2 4196.4
4400
4500
4600
4700
4800
4900
5000
5100
5200
530O
100 36.9 202.3
100 38.7 201.7
100 40.5 200.7
100 41.1 200.5
100 41.6 201.4
100 42.0 201.9
100 41.6 203.0
100 41.1 204.2
100 41.1 204.8
100 42.3 206.4
100 43.0 207.2
100 43.6 207.2
100 44.2 205.8
100 46.1 209.3
100 46.6 209.9
100 47.0 210.4
100 47.4 211.3
100 47.1 211.2
100 46.5 211.3
100 45.9 211.1
5400
5500
5600
5700
5800
5900
6000
6100
6200
6300
4277.3
4356.3
4433.2
4508.9
4583.9
4658.4
4732.9
4808.0
4883.3
4958.1
5031.7
5104.5
5176.5
5246.9
5315.9
5384.3
5452.2
5520.1
5588.5
5657.7
VS
ft
-0.4
-0.3
0.5
1.3
2.9
6.2
11.9
22.4
38.7
60.5
86.7
116.5
149.8
186.8
227.3
271.4
318.7
369.2
422.2
477.8
536.2
597.3
660.9
725.9
791.7
858.1
924.6
990.6
1056.2
1122.6
1190.4
1258.9
1328.3
1399.2
1471.6
1544.4
1617.6
1690.8
1763.5
1835.5
LAT DEP D'LEG
ft ft °/100
-6.6 14.0 0.0
-6.7 14.0 0.0
-7.6 13.9 0.2
-8.5 13.9 0.2
-9.9 13.2 0.8
-12.7 11.4 1.2
-17.7 8.6 1.7
-27.4 4.7 3.5
-42.7 -1.3 3.4
-62.9 -9.8 2.9
-87.5 -19.2 2.6
-115.8 -29.3 1.9
-147.3 -40.7 2.3
-182.4 -53.4 2.3
-220.6 -67.5 2.3
-262.0 -83.3 2.0
-306.8 -99.5 2.5
-354.9 -116.2 1.9
-404.9 -134.9 1.8
-456.9 -155.2 1.9
-511.4 -177.0 2.1
-568.3 -200.0 1.9
-627.8 -223.0 1.9
-689.0 -245.9 0.7
-750.8 -269.6 0.8
-812.8 -294.2 0.5
-874.5 -319.6 0.8
-935.0 -346.1 1.0
-994.8 -373.3 0.4
-1054.7 -402.0 1.6
-1115.2 -432.5 1.0
-1176.1 -463.9 0.5
-1238.2 -494.9 1.2
-1301.1 -527.8 3.1
-1364.1 -563.5 0.7
-1427.1 -600.1 0.5
-1490.1 -637.8 0.8
-1552.9 -676.0 0.3
-1615.2 -713.8 0.6
-1677.0 -751.2 0.7
Client
Well Name
Location
TELECO OILFIELD SEVICES INC
: PRUDHOE BAY DRILLING
: F40
: F-PAD
: PRUDHOE BAY
: NORTH SLOPE
Page 2 of 2
Date OCT 29, 1991
Filename : 851TAK
Interpolated 100 ft of MD
MD
ft
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
85OO
8600
8700
8800
8900
9000
9100
9200
9300
9400
9500
9600
9700
9800
C~L INC DIR TVD VS
ft deg deg ft ft
100 45.3 210.7 5727.7 1906.8
100 44.3 210.4 5798.6 1977.1
100 43.3 210.2 5870.9 2046.1
100 42.1 210.4 5944.4 2113.8
100 40.5 210.1 6019.5 2179.7
100 39.0 210.2
100 38.9 210.2
100 38.7 210.6
100 38.4 210.6
100 38.3 210.6
100 38.0 210.5
100 37.6 210.3
100 37.4 210.4
100 37.2 210.7
100 36.8 210.9
100 36.4 210.1
100 36.0 206.2
100 35.3 203.3
100 34.3 204.5
100 33.7 203.6
100 33.0 204.4
100 32.6 206.9
100 33.7 208.3
100 34.6 210.2
100 35.6 211.2
100 36.1 212.0
100 37.1 212.2
100 38.3 213.6
100 39.2 215.8
100 40.1 217.7
100 41.6 217.2
100 43.2 213.4
100 42.7 214.0
100 43.9 210.6
100 43.8 213.9
6096.4
6174.2
6252.1
6330.3
6408.8
6487.5
6566.5
6645.9
6725.4
6805.3
6885.6
6966.4
7047.6
7129.7
7212.6
7296.1
7380.2
7463.9
7546.6
7628.4
7709.4
7789.7
7868.9
7946.9
8023.9
8099.7
8173.5
8246.7
8319.5
8391.6
2243.5
2306.2
2368.7
2430.9
2492.7
2554.4
2615.5
2676.2
2736.6
2796.6
2856.1
2915.1
2973.3
3030.4
3086.2
3141.1
3195.2
3249.9
3306.0
3363.5
3421.8
3481.2
3541.9
3603.9
3666.7
3730.8
3797.5
3865.1
3933.4
4002.4
LAT DEP D'LEG
ft ft °/100
-1738.3 -787.8 0.7
-1799.0 -823.6 1.0
-1858.7 -858.5 1.0
-1917.3 -892.6 1.2
-1974.3 -925.9 1.7
-2029.6 -958.0 1.5
-2083.9 -989.6 0.1
-2137.9 -1021.3 0.3
-2191.5 -1053.0 0.3
-2244.9 -1084.6 0.1
-2298.1 -1115.9 0.3
-2350.9 -1147.0 0.4
-2403.4 -1177.7 0.2
-2455.5 -1208.5 0.3
-2507.1 -1239.3 0.4
-2558.5 -1269.7 0.6
-2610.5 -1297.4 2.4
-2663.4 -1321.9 1.8
-2715.7 -1345.0 1.2
-2766.7 -1367.8 0.8
-2816.9 -1390.1 0.8
-2865.8 -1413.5 1.4
-2914.2 -1438.8 1.3
-2963.2 -1466.3 1.4
-3012.7 -1495.7 1.1
-3062.6 -1526.4 0.7
-3113.1 -1558.1 1.0
-3164.4 -1591.2 1.5
-3215.8 -1626.8 1.7
-3266.9 -1665.0 1.5
-3318.7 -1704.8 1.6
-3373.6 -1743.8 3.0
-3430.3 -1781.6 0.6
-3488.3 -1818.2 2.6
-3546.8 -1855.2 2.3
9941 141 43.5 217.1 8493.9 4098.1 -3625.2 -1912.4 4.5
TELECO OILFIELD SEVICES INC
Client : PRUDHOE BAY DRILLING
Well Name : F40
Location : F-PAD~
: PRUDHOE BAY
: NORTH SLOPE
Page 3 of 2
Date OCT 29, 1991
Filename : 851TAK
Interpolated 100 ft of MD
Origin of Bottom Hole Closure SLOT
Bottom Hole Closure 4099 ft 207.8°
TRUE VERTICAL DEPTH
100' INTERPOLATED
TELECO OILFIELD SEVICES INC
ALASKA
PRUDHOE BAY DRILLING
Well Name
Location
Date Surveyed
Job No.
Survey Performed By
: F40
: F-PAD
: PRUDHOE BAY
: NORTH SLOPE
: OCT 29, 1991
: 851TAK
: CRAIG TOMAYER
?his survey is correct to the best of my knowledge
~nd is supported by actual field data.
· · ~ COMPANY REPRESENTATIVE
TELECO OILFIELD SEVICES INC
Client : PRUDHOE BAY DRILLING
Well Name : F40
Location : F-PAD
: PRUDHOE BAY
: NORTH SLOPE
Date OCT 29, 1991
Filename : 851TAK
Interpolated 100 ft of TVD
Plane of Vertical Section : 206.8°
Latitude & Departure relate to : SLOT CENTER
Vertical Section Originates at : SLOT CENTER
Slot Coordinates : Lat 0.000ft
_ : Dep 0.000ft
Directions Referenced To : TRUE NORTH
Depth at Drill Floor : 0.00 ft
Calculation Method
: MINIMUM CURVATURE
Magnetic Declination :+30° 0.000'E
Platform north : +0° 0' 0'' (T)
Grid convergence : +0.0000°
Client
Well Name
Location
TELECO OILFIELD SEVICES INC
: PRUDHOE BAY DRILLING
: F40
: F-PAD
: PRUDHOE BAY
: NORTH SLOPE
Page 1 of 2
Date OCT 29, 1991
Filename : 851TAK
Interpolated 100 ft of TVD
MD C~L INC DIR
ft ft deg deg
2487 0 0.5 159.0
2500 13 0.5 161.5
2600 100 0.5 180.2
2700 100 0.6 198.9
2800 100 1.3 210.5
2900 100 2~'5 212.5
3000 100 4.2 206.5
3101 101 7.7 199.9
3202 101 11.2 202.6
3305 103 14.2 202.6
3409 104 16.6 199.5
3514 105 18.7 200.0
3620 106 21.2 199.7
3728 108 23.6 200.0
3838 110 26.1 201.4
3951 113 28.5 199.8
4066 115 31.0 199.2
4184 118 32.8 201.2
4304 120 35.0 201.3
4429 124 37.4 202.1
4557 128 40.0 201.1
4688 132 41.1 200.4
4822 133 41.7 201.6
4956 134 42.1 202.1
5089 134 41.1 204.1
5222 133 41.1 205.0
5357 135 42.8 207.0
5494 137 43.5 207.2
5633 139 44.9 207.0
5777 144 46.6 209.8
5923 146 47.1 210.7
6071 147 47.3 211.2
6217 146 46.4 211.2
6361 144 45.5 210.8
6502 141 44.2 210.4
6640 138 42.9 210.1
6774 134 40.9 210.2
6905 131 38.9 210.2
7033 128 38.8 210.3
7161 128 38.5 210.6
TVD
ft
2487.0
2500.0
2600.0
2700.0
2800.0
2900.0
3000.0
3100.0
3200.0
3300.0
3400.0
3500.0
3600.0
3700.0
3800.0
3900.0
4000.0
4100.0
4200.0
4300.0
4400.0
4500.0
4600.0
4700.0
4800.0
4900.0
5000.0
5100.0
5200.0
5300.0
5400.0
5500.0
5600.0
5700.0
5800.0
5900.0
6000.0
6100.0
6200.0
6300.0
VS
ft
-0.4
-0.3
0.5
1.3
2.9
6.2
11.9
22.5
39.2
61.8
89.2
120.9
156.9
197.8
243.8
295.2
352.0
413.8
480.4
553.6
633.0
718.1
805.9
895.3
983.6
1070.7
1161.0
1254.7
1351.9
1454.8
1561.2
1669.3
1775.6
1878.9
1978.4
2073.4
2162.8
2246.5
2326.9
2406.8
LAT DEP D'LEG
ft ft °/100
-6.6 14.0 0.0
-6.7 14.0 0.0
-7.6 13.9 0.2
-8.5 13.9 0.2
-9.9 13.2 0.8
-12.7 11.4 1.2
-17.7 8.6 1.7
-27.6 4.6 3.5
-43.2 -1.5 3.4
-64.0 -10.2 2.9
-89.9 -20.0 2.5
-119.9 -30.8 2.0
-154.0 -43.2 2.3
-192.8 -57.1 2.2
-236.0 -73.5 2.3
-284.5 -91.6 2.2
-338.6 -110.5 2.2
-397.0 -131.9 1.7
-459.3 -156.2 1.8
-527.5 -183.6 2.0
-601.6 -213.0 2.1
-681.7 -243.2 0.9
-764.1 -274.8 0.8
-847.4 -308.2 0.4
-928.7 -343.2 1.2
-1008.0 -379.4 0.4
-1089.0 -419.2 1.6
-1172.4 -462.0 0.6
-1259.1 -505.7 1.0
-1349.5 -555.2 1.8
-1441.6 -608.8 0.6
-1534.4 -664.8 0.3
-1625.6 -720.1 0.6
-1714.3 -773.6 0.7
-1800.1 -824.3 0.9
-1882.3 -872.2 1.0
-1959.7 -917.4 1.5
-2032.2 -959.5 1.5
-2101.8 -1000.1 0.1
-2170.8 -1040.7 0.3
BP EXPLORATION
PAD F
(12-1 I-I1-1:::.'5)
F 40
Controlled
LES HENDERSON
(907) 333-1552
Drilling
Consultants,
Inc.
CONTROLLED DRILLING CONSULTANTS, INC.
P.O. Box 190560
Anchorage, Alaska 99519-0560
(907) 333-1552
November 8,1991
Mr.. Larry Driscoll
BP Exploration
Pouch 196612
Anchorage, Ak. 99519-6612
RE: Magnetic Single Shot Survey
Job No.A-1091-025
Well: F-40
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: 10-25-91 to 11-8-91
Dear Mr. Driscoll'
Please find ~enclosed the "Original" and four (4+
copies of our Magnetic Single Shot Survey on the above
well. The method used in calculating this survey was
Radius of Curvature. The depth of the survey was 494'
to 9941 '.
Thank you for giving us this opportunity to be of
service.
Yours very truly,
Controlled Drilling Consultants, Inc.
Directional Supervisor
HORIZONTAL VIEW
B.R EXPLORATION
WELL F-40 (12-11-11-13)
RADIUSOF CURVATURE
MAGNETIC SINGLE SHOT
SCALE: I" = 1,000'
OCTOBER 2571991
eOoo
TVD = 87495.10'
TMD= 9~941'
ALL DEPTHS SHOWN
ARE TVD
BP EXPLORATION
MAGNETIC SINGLE SHOT SURVEY
RADIUS.. .O-F..CURVATVRE i~I~THOD OF COMPUTATION
ENGINEER .-C., W-, HARRiNGTON
COMPUTE[~ .FOR CDC 8Y OCEANTECH(FH LINDSEY
.......... TRUE
HE.A~--, ORIF.-T--VERTICAi.
DEPTH ANGLE DEPTH
RECORD OF SU. RVE¥
JO8 NO A-!09i-025
WELL F-,40
)KB ELEV 67.43 FT,
SURVEY DATE '25/1.8/9I
PROPOSED Di'R S26-49t,~
C L 0 S U
D I. STANCE
RES
A N G L E
D M
19.88
.2487 e .... ~8 .... 2486.9I
2824 I ~6 28.23.88
2-9I~ .2 42 29t5,82
2997 4 6 2996,67
3.0.89 7-t8 30.88.21
327? 13..24 3273,~4
33-72 I6 8 3364,93
3559 I9. 48 3542.99
3653 22 O 3630.80
374924-6
3827 2554
3921 27 42
4015 3~ 6
0
'-67,43 t,t , OOE
915,55 t',t5 ~ , OOE
1421 ,SJ NgO,.OOE
24~9,48 S2I,OOE
2663,47 924,7OW
2756,45 $32,5~W
2848,39. S32.58W
2929,24 S26,OeW
3820.78 Sig,SOW
3I i 3.65 922, ~Okt
3205,6i S23,70W
3297,58 S~9,80W
3386,53 ;~ t. 9 , i Ol.d
3475,56 S20,90W
~563,~7 SI 9, I OW
;~65~ ,78 S28,20W
37~,-, ~o~,6OW
3~888.57 SIO,80W
2, I4
~0,45
17,54
39,44
57,28
79,6~
133,33
164,83
200,23
23 !, 02
:270,61
313,4~
13,06
8,83
5 25
7 48
16 42
25
~5 67
4.7. I4
59.78
7] ,54
86
O~
3,88
1 t
16.51
i 6.73
I: 7,44
19.64
26.46
39,44
57,77
8~ ,34
~ 88.
I ~8,02
208,96
241
284, 15
329.56
LDO O 0 i,,J
ZO 39 20 E
DOG LEG
SEVERITY
D,EG/)OOFT
,099
,065
i .i96,
I .729
~,48~
3,299
S.~92
2,755
2.35'.I
i. 942
2,581
$ E C T,.'
D ]::S T A .....
O
2,0
~,4
~5,;
~4 4
78,5
iO5,i
205.6
2~8.4
325.6
' BP WELL F-40
:! TRUE
I~i.E A. ~ .... D_R..IF ,l:..VER:T I CAL
I
i . 4297. 34 48 4i93,~'
3~_42 4~69,46
': 4~.7 I..-4.0 t8 441 I' 25
:'[ 4849 41.48 4620,90
~ .494,~.42 1,2 4~9a,75
:~ 5130 41 0 4830 :59
~, · I
' 531.6 42. 4969,B5
..i ~ ~ -, ,
: 5972 .4F.. ~.0 __ 5433,15
' .6535 ~3. 48 5824.69
':.-~-. ~ ~,~
B~J.I ...... 3~.48 ~.~5~9B
7t89 38.24 ~32a' ~.~22
7~2._._36 3_6 6841,04
7925 36. i8. 6907.~0
8126 B5 .... 6 7~71,0S
8409 32 54 7305.91
: 8597 33 42 7463,04
8692 34 30 754 J , 7i
4 047,71
4276,55
4343,82
4553,47
~623,32
q763, J6
5039,30
5 ~ 07.03
5237, B~
5365,72
5558,58
5757,26
5895,93
6 038,53
6255.79
6473,92
6773, ~1
684 O, ~7
70ilO. 97
7i59,87
7238,48
7~95.61
7474,28
Si-tOT SUR VE?.'
JO8 NO A.--109~-625
C 0 M P U T E'R -. I t H 0 V '.? 't
i<B £L, EV 57', 43
RECORD OF~ ~, "'
DRIFT
D t R E C
DEG,
92 t, 6
822.3 OW
$21., 9 OW
.82 0,9
.82~,
S21 ,90~
$24,
S27
S25,78W
S29,SOW
SSI, 4~
.93 J , 2 OW
830,
S30.50W
S3e,60~
S3O
S~O,90W
929,80W
S22,88W
825, OOW
92~.30W
S24.56W
S28.28~
S3O, i OW
TOTAL COORDINATES
405,76 S I35,17
50~. 55 $ J74,63
558.63 S J96,J9
6=~9,99 S
779,96 S 292.92
838,32 $ 306.38
952,46 S ~55,i9
1064.20 S 408,60
~lZe,5S S 4.66,77
)236.95 S 495,80
J354, 12 S 557,44
1472,56 S 627', 49
1648,35 ~ 734,37
18t9,09 S 835.95
J929,85 $ 900,93
2034 21 $ ..~2 04
2~8~.80 S i 049.80
2330,98 S J1~6,32~
2526,42 S ~ 25 ) , 9 J
2568.98 S 1276.83
2674.06 S 1328,76
2722,86 S !350.39
2771,14 S i372,04
'"' .~
2910,74 S t43~,72
2957,25 S I4~4,66
C L 0 S U R E ,-'o
427,.68 S 18 25 27
4,80,68 S i8 45 7
534,86 S 19 3 23.
59'2,08 S 19
647,20
829,69 S ~9 56 i6
892,55 $ 20 4 '34
i8t6.54 S 20 27 4
~i'~9..,94 S 2i
')267,65 S 2i 36 i9
J332.6J S 2~
i464.~7 $ 22 ~" 38
t~00,68 S 23 4 47
i804,54 S 24 0 49
2801,98 S 24
2129,79 $ 25 ! 30
2250,23 S 25 ~:3 39
2423,63 S 25 40 28
2593.
28t9,59 S 26 2J 34
2868.79 S 26 ~5 4J
2986.00 S 26 25 23
3039.~3 S 26 22 473
3092,20 S 26 20 26
~4~,69 S 26 ~8 2
3246.89 ~ ,:~ 1" '"'8 8
3300,08 S 26 20 57
DOG LE~
SEVER I TY
DF.G/i OOFT'
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
,45.4
,563
,426
,599
,004
,666
,462
,868
,059
¢06
,t54
,256
,589
,293
.760
,7'4O
,059
S E C T :. 0 N
b 1 S T A N C E
,37' 3
42~ 89
52?
587,~"' :,.
64i 97
,'t Oi O.:~, ....
i i 74,88
1°': '''' 4J
~ 459,97
"i 597, .=. '~ 7
2592,93
28~9,59
2~68 72
· ~q85 93
-'9'- 09
~'.l 43 56
7246 76
3299 ~?
WELL
INGLE
JOB t,iO .~-- i 0'9 ~ --026
K8 ELEV
REuOR~) OF'
" URVEY
TRUE
'-! MEAS DRI.I;T VERTICAL SUB
I: ~ DiIE P TH . Ai.N~i,LE ........... DEPTH
~?l 88.54 .54. ~i"~. 08 76O6.
~ .... 8~4~ ~6. 1.8 7~4g.~ 7681
' ~8 38. 42 7900,.74 7833,3
. 9230 39 24 7972,t9 7'~04.,76
'-':i9.4~._1 4.t 48 09,61 8 042,t8
;,?'i960t ,i2_4.2 8249,07 818t ,64
.69~ 4.3 5~ 8318 2i 8250 78
,:"i 9791.. 43 54 838.6,.66 83I 9,23
.~ ' ' I ' '~' EXTRaPOLR'TED TO TD
, I
~94..~ 43 ~0 849o,I0 8427,
:~' 80TTO~I HOLE~ .CLOSURE
:, ,
DRIFT
DIREC
TOTAL
3322,4t $ 1789,84 W
3374,92 S }746,82 W
3428,89 S 1782,67 W
3483,98 S }8~7,43 W
~539,,80 S ~852,39 W
3624, ~o ,
4097,89 }2'EET AT S 27 49 4 W
CLOSURE"
ISTANCE
D
DOG LE,6
D E r~ / t 'O ,~ F T
3447,?I S 2~ 33 44
.3~63,18 S 26 47 0 W
3620,48
,38e,,4 6 "'~
3995,19 S 27
,456
} ,342
1,160
2,494
,74~
2, i76
4097,89 $ 27 49 4 W I,'1.37
f40 V
FT,
· ~EC r I ON
C~, I S't'
A ~,,., E
3447,68
3736,47
38 0.0,
3864.
3929,2~
3994,80
8P WELL F.-48 SINGLE SHOT SURVEY JO8 ~0 A-~09'l-025
.NE~SLtRE.D.-..D.EPTH AND OTHER .D~T~ FOR EVERY EVEN ~O~ FEET OF SUB SEA DEPTH,
I<B EL, EV ~'7:4S FT,
;.-- ..... DEPTH
[ -
..... 267
......... 3.6.7_ ...............
4.6;~ ..
' .5.~ .7
.. ~6Z..
--. .....
" . 9.6Z ........
. A 0.6.7. .....
I 1.67
" I
" 1567 ....
i7B7
.I 9.~7
" 25fi8
3Ifi9
~27.1
3375
~479
TRUE
VERTICAL ,SUB HD-TVD
DEPTH SEA DIFFERENCE
267, 280
767, 7 O0
867,
9~7, 900
i i 67, ~ i O0
~267, t200
13.67, I3OO
i 467. 1400
15.67, ISOO
1.6&7, ~OO
I7&7, 1708
2067, 2O00
2167,
2267. 22/~a
2~67, 23r;8
2467, 2468
2567, 2500
2667, 2608
2767, 2700
2867, 280f
2967, 2908
~0~7, 3000
3267, 3208
2~367, 3300
3467, 34 00
CORRECT ION
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
0
0
0
0
0
0
0
O
0
2
4
",,,
,.'
TOTAL
,76
1.,86
2,7~3
3,77
3,7S
3,42
~,. '0,9
2:,, 76
2,44
2,15
~,93
2. ~.
2,.39
2,77
3.23
3,.72
4.94
5,67
6,45
8,z,.
9,.34
~I,65
i5,80
~3,
37.i7
56,07
80,34
I09,09
.80 kl
,63 E
,92 E
,5i' E
,i8 W
1,92 E
~,68 E
4,64 E
5,79 H
7,06 E
8,25 E
9.32 E
I0,27 E
ti,09 E
i I. ,82 E
i2,49 E
~3,06 E
~3,93 E
i4. '!6 E
1~.69 E
i2.~0 E
~,i5 E
!,OO E
26,7'9 W
BP OELL F-40 SINGLE SHcl SURVEY'
N.E.ASUREO..DEPT. H AND Ot'~ER DRTA FOR EVERY EVEN lO0 FEET OF SUB SEA DEPTH,
T~UE
MEASURED VERT I CAL SUB' ND-TVD VERT ~ CAL
. _DEF?"YH. DEPTH "'
--- ~ER. DIFFERENCE CORRECT'lOB
...........
"~ .......... 38.02
.4_0~..
4~.45
.~'
4_387
..
.....
.~ 777
4912
5
..
-' .55.88
- .. 5~.75
6923.
.. 6 I_.69
~455.
~5.94.
.
..
6 8.Gt
?372 _
7499
76.25
7~75
.... 7999
TOTAL
3967, 3900 60 t4
4067, 4'00~ 77 'l?
4~7, 4I ~ 97 20
4267, 42e0 t20 2~
4367, 4300 146 26
44&7, 4400 ~77 :Si
~567, 4500 2t O 35
46,37, 4608 244 34
4767, 4780 278 34
4867, 4,800 3t i 3~
4967, 4900 345 34
5067. 5.000 382 37
5167, 5I OO 420 38
5267, 5280 462 42
5367, 5380 507 45
5467, 5480 555 48
5567, 550~ Gal 46
5667, 5600 646 45
5767, 5'700 687 4I
58~7, 5800 726 39
5967, 5900 762 36
6067, 6OOO 793 ~t
6167, 6~ 09 822 29
6267, 6200 850 28
6367, 6300 877 27
6467, 6400 904 27
~567, 65~i0 931 27
6667, 6600 957 26
6767. 6700 982 25
~¢8~7 . 6800 ~ 007 25
6967. 6909 1031 24
267,55
377,23
438,08
504, I7
576, i 0
654 ,. 77
735,8~
818,78
9el
98t
I 062,64
~ ~ 45 ,, 47
I319,80
t411,57
t 595,76
1854.09
1932.98
2007, 07
2876,8~
2145,65
228~ ,47
2348,~5
~ 9,23
2543,22
2607, ~ 5
67,63
85,52
i03,97
i24,24
~47,88
t74.,07
20,3,t5
265,32
298,53
~32,78
$68,67
407,82
449,80
49~,84
538,30
590,87
646,89
702,48
756,49
856.4,3
982.79
946,22
986,89
I~27 ~9
}067,58
1t87,34
lt45,49
1185,26
i223 76
~26~,88
}29? 57
BP txI£LL. F'-'40
:,SHOT SU~'¢E¥, - JOB
t~I~ASURE. D.....DiEPTN .AND OTHER DATA FOR EVERY EVEN tO0 FrEET OF
.... 'Tt~UE
HERS. U.RED VERTI.'C~CtL SUB t~D-TVD VERTICRL
DEPTH DEPTH SEA DtFFEREbICE tCORREC,, TiON
82_4~. 7167, 71 O0 i 0F5
.~.3.~3 7267 ~ 7200 i 095 20
8602 . 7467, 7400 iI 34 20
872~ 7567~ 7500 it55
~0.4_6. 7667 , 7,58 O ~t 78 2~
O.~O 7767, FTOO 1202 24
S.O.95 7867, 7800 1228
..... ¢224 7967, 790 O 1256
94~9 8167, 8i O0 ~.321 34
.97&4_ _ 8~&7,. 8~OO ~ 396
99.0.3 .......... e4.67 , 8400 i 4~5
994~. ...... 8495, 8428 ~ 445
bio A--~ 09t.-025
S U 8 S rE A D E P Ttq,
TOT~L C6. ORD t df4 ]rrE~
2671,7I $ i3;27,77
2734,50 S t355,
2795,41 S i'382,.
2854, .48 $ i409,
291 ;~. 3~ $ t440,,
2972,60 S i473,
~033,24 S IS'fO,
~095.t6 S i548,.
3t5~,06 S ~590,
3224,97 S i636.,
~292,69 $ i~e7,.45
3~65,42 8 ~740,5~
3443,09 $ i79.~,09
3524,3i $ 1842,26
3624,~2 S i9i2,:~4
KB ELEV '67., 4S FT,
WELL
IHTERPOLATED VALUES FOR EVEH
DEPTH . DEPTH
O O.
_20.0~ 2000.
.......... 3000 ~000.
4_080 3943,
5000 4733,
&O00 5452,
7.000 6175,
................ 9-0..00~ 7792,
9941 8495.
S!N(~LE SHOT SURVEY
TOTAL :COORD I NATES
-47, ,00 S ,00 W
29~2.. t7,73 $ 0,74 E
4666, 87~,62 S 320,85 id
5385, 1490, i 6 $ 638,2~ t.j
6981, 2607,79 S 1297.,89 td
7724, 3Ii'0,46 $ I558,72 W
8428, 3~24~'32 S ~9!2,g4 W
NO A.-t 091'-025
CO~'tPUTER-
K8 ELEV
NOV 9 '~
F
, .,. /:'7-.-...":...~.~ .r..-..~
~ ~ ~/× ~/,,i~~ ,:/~ i.<' ,... ,
~.,-.-~__~ .~ ~._~....
SUB- SURFACE
DIRECTIONAL
SURVEY
U
IDANCE
~ ONTINUOUS
[-~ OOL
Alaska Oil & Gas rSons.
A~chora!~6
Company BP EXPLORATION
Well Name F-40 (12-11-11-13)(3005'FNL,2884'FEL,SEC 2,TllN,R13E)
Field/Location PRUDHOE BAY, NORTH SLOPE, ALASKA
Job Reference No.
75315
Logged By:
M. MC;DRIDE/
Date
03-DEC- 1991
Computed By:
R. KRUWELL
SCHLUMBERGER
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
BP EXPLORATION
F-40 (12-11-11-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
SURVEY DATE: 03-DEC-1991
METHODS OF COMPUTATION
TOOL LOCATION:
INTERPOLATION:
VERTICAL SECTION:
ENGINEER: M.MCBRIDE
TANGENTIAL- Averaged deviation and azimuth
LINEAR
HORIZ. DIST. PROJECTED ONTO A TARGET A~IMUTH OF SOUTH 26 DEG 49 MIN WEST
BP EXPLORATION
F-40 (12-11-11-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
COMPUTATION DATE: 05-JAN-92 PAGE 1
DATE OF SURVEY: 03-DEC-1991
KELLY BUSHING ELEVATION: 67.40 FT
ENGINEER: M.MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECT[ON SEVERITY NORTH/SOUTH EAST/WEST D[ST. AZIMUTH
0.00 0.00 -67,40 0 0 N 0 0 E
100.00 100.00 32.60 0 18 S 75 11 W
200.00 200.00 132.60 0 19 $ 29 31 W
300.00 300.00 232.60 0 10 S 19 54 W
400.00 400.00 332.60 0 19 S 12 9 W
500.00 499.99 432.59 0 16 S 27 49 E
600.00 599.99 532.59 0 14 S 53 39 E
700.00 699.99 632.59 0 17 S 85 29 E
800.00 799.99 732.59 0 15 N 59 36 E
900.00 899.99 832.59 0 20 N 81 50 E
N 48 4 E
N 70 20 E
N 84 11 E
N 75 15 E
N 77 26 E
N 69 37 E
S 66 3O E
S 65 10 E
S 42 18 E
S 69 43 E
1000.00 999.99 932.59 0 28
1100.00 1099.98 1032.58 0 37
1200.00 1199.97 1132.57 1 6
1300.00 1299.95 1232.55 1 1
1400.00 1399.94 1332.54 1 0
1500,00 1499.93 1432.53 0 37
1600.00 1599.92 1532.52 0 31
1700.00 1699.92 1632.52 0 26
1800.00 1799.92 1732.52 0 17
1900.00 1899.91 1832.51 0 26
0 41
0 38
0 23
0 22
0 19
021
0 25
0 32
1 24
2 24
S 53 22 E
S 61 53 E
S 66 31E
S 45 39 E
S 6 5 E
S 20 22 E
S 22 50 E
S 3 37 W
S 26 37 W
S 32 17 W
2000.00 1999.91 1932.51
2100.00 2099.90 2032.50
2200.00 2199.90 2132.50
2300.00 2299.90 2232 50
2400.00 2399.89 2332 49
2500.00 2499.89 2432 49
2600.00 2599.89 2532 49
2700.00 2699.89 2632 49
2800.00 2799.87 2732 47
2900.00 2899.81 2832.41
5 26 42 W
S 21 11 W
522 9 W
S 20 58 W
5 19 19 W
5 19 57 W
S 19 51 W
S 18 40 W
5 19 30 W
5 19 19 W
3000.00 2999.68 2932.28 4 3
3100.00 3099.14 3031.74 7 44
3200.00 3197.81 3130.41 11 5
3300.00 3295.41 3228.01 14 11
3400.00 3391.86 3324.46 16 11
3500.00 3487.44 3420.04 18 22
3600.00 3581.65 3514.25 20 55
3700.00 3674.45 3607.05 22 52
3800.00 3765.71 3698.31 25 25
3900.00 3855.22 3787.82 27 27
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 O0
0 04
0 61
1 03
1 ,46
1 92
2 04
1 95
1 6,4
1 36
0 76
0 04
-0 84
-2 04
-3 25
-4 29
-4 72
-4 61
-4 61
-4 56
-4.53
-4.35
-4.42
-4.28
-3.93
-3.47
-2.96
-2.42
-0.77
2.79
7.76
17.86
33.97
55.62
81.81
110.96
144.20
181.13
221.61
265.82
0.00
0.00
0.15
0.23
0.00
0.31
0.20
0.00
0.32
0.31
0.09
1.16
0.44
0,06
0.00
0.28
0.05
0.84
0.93
0.00
0.00
0.78
0,09
0.26
0.06
0.00
0.11
0.69
1 .49
0.25
4.22
3.2O
3.39
3.06
0.97
2.54
2.22
2.16
2.67
1 .70
0.00 N
0.03 S
0.46 S
0875
1 27 S
1825
2 10 S
221 S
2 125
201 S
1.68 S
1.20 S
1.05 S
0.59 5
0.17 S
0.31 N
0.32 N
0.18 5
0.43 S
0.80 S
1 24 S
1945
2255
2635
3 14 S
3765
4 43 S
5 13 S
6 69 S
9755
14 O0 S
23 45 S
38 54 S
58 72 S
83 48 S
111 17 5
142 65 S
177 79 S
216.41S
258.47 S
0 O0 E
0 04 W
0 43 W
0 56 W
0 72 W
0 66 W
0 36 W
0 05 E
0 57 E
0 96 E
0.00 N 0 0 E
0.05 S 53 14 W
0.63 S 42 42 W
1. O3 S 33 1 W
1.46 S 29 31 W
1.93 S 19 53 W
2.13 S 9 40 W
2.21 S 1 21 E
2.20 S 15 4 E
2.22 S 25 28 E
1.63 E
2.28 E
3.94 E
5.68 E
7 54 E
8 89 E
9 84 E
10 58 E
11 06 E
11 69 E
2 34 S 44 11 E
2 58 S 62 15 E
4 08 S 75 6 E
5 71 S 84 7 E
7 54 S 88 41 E
8 90 N 87 59 E
9 84 N 88 9 E
10.58 5 89 2 E
11.07 $ 87 47 E
11.72 $ 86 5 E
12.49 E
13.48 E 13
14.23 E 14
14.69 E 14
14.93 E 15
15.13 E 15
15.33 E 15
15.52 E 16
14.94 E 16
13.09 E 16
12 55 S 84 20 E
62 5 81 49 E
40 $ 81 2 E
93 5 79 50 E
25 5 78 8 E
59 S 76 2 E
96 S 73 52 E
35 S 71 42 E
37 5 65 52 E
33 S 53 19 E
10.48 E 17.48 S 36 49 E
6.79 E 24.41 S 16 9 E
0.94 E 38.56 S 1 24 E
7.13 W 59.15 S 6 56 W
16.21 W 85 04 S 10 59 W
26.04 W 114 18 S 13 11 W
37.44 W 147 48 S 14 42 W
49.81 W 184 63 S 15 39 W
63.11 W 225 43 S 16 15 W
77.91 W 269 96 S 16 46 W
BP EXPLORATION
F-40 (12-11-11-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
COMPUTATION DATE: 05-JAN-92 PAGE 2
DATE OF SURVEY: 03-DEC-1991
KELLY BUSHING ELEVATION: 67.40 FT
ENGINEER: M.MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG R.ECTANGULAR COORDINATES HORIZ, DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0
4000,00 3943,06 3875,66 29 42 S 19 15 W 313.18 2,51
4100,00 4029,04 3961,64 31 36 S 19 20 W 363 77 1,56
4200,00 4113,46 4046,06 33 11 S 19 41 W 416 95 1.62
4300 O0 4196 37 4128,97 34 53 S 19 57 W 472 43 1,71
4400 O0 4277 34 4209,94 36 57 S 20 12 W 530 69 2,16
4500 O0 4356 23 4288,83 38 57 S 20 11 W 591 73 2.11
4600 O0 4433 13 4365,73 40 19 S 20 9 W 655 22 0,98
4700 00 4508 99 4441,59 40 56 S 21 18 W 719 98 0,76
4800 O0 4584 20 4516,80 41 32 S 21 37 W 785 61 0,68
4900.00 4658 76 4591.36 41 59 S 21 51 W 851 98 0.61
5000 O0 4733,50 4666.10 41 6 S 22 22 W 918,19
5100 O0 4809.06 4741.66 40 47 S 23 41 W 983.54
5200 O0 4884,75 4817,35 40 58 S 24 18 W 1048.82
5300 O0 4959.54 4892.14 42 13 $ 25 7 W 1115.14
5400 O0 5033.18 4965.78 42 52 S 25 9 W 1182.77
5500 O0 5106.19 5038.79 43 27 S 25 36 W 1251.08
5600.00 5178.30 5110.90 44 13 $ 26 24 W 1320,36
5700,00 5249,00 5181.60 45 48 S 28 58 W 1391,06
5800.00 5318.19 5250.79 46 30 S 30 13 W 1463.16
5900.00 5386.87 5319.47 46 47 $ 30 23 W 1535.71
6000.00 5455,01 5387 61 47 18 S 30 34 W 1608.75
6100.00 5522,93 5455 53 46 59 S 30 46 W 1681.98
6200.00 5591.43 5524 03 46 32 $ 30 45 W 1754.66
6300.00 5660.66 5593 26 45 52 S 30 39 W 1826.65
6400.00 5730.87 5663 47 45 5 S 30 31 W 1897.71
6500.00 5802.02 5734 62 43 58 S 30 33 W 1967,83
6600.00 5874.48 5807 08 43 10 S 30 21 W 2036.60
6700.00 5948.03 5880.63 42 7 5 30 21 W 2104.23
6800.00 6023.17 5955.77 40 21 5 30 0 W 2170.10
6900.00 6100,15 6032,75 39 6 5 30 4 W 2233,82
7000.00 6177,94 6110,54 38 46 S 29 59 W 2296,56
7100.00 6256,06 6188,66 38 32 S 29 58 W 2358,89
7200,00 6334,39 6266,99 38 20 S 29 53 W 2420,96
7300.00 6412,95 6345.55 38 6 S 29 56 W 2482,75
7400,00 6491,73 6424,33 37 55 S 30 0 W 2544,25
7500,00 6570,82 6503,42 37 36 S 30 6 W 2605,35
7600,00 6650,22 6582,82 37 21 S 30 12 W 2666,03
7700,00 6729,82 6662.42 37 5 5 30 8 W 2726,46
7800,00 6809,76 6742,36 36 43 S 30 8 W 2786,44
7900,00 6890,18 6822,78 36 16 S 30 15 W 2845,78
FEET FEET FEET DEG
303,55 S 93 71 W 317,69 S 17 9 W
351.74 5 110
402.26 S 128
454.86 S 147
5O9 96 S 167
567 62 $ 188
627 64 S 210
688 62 S 233
749 94 S 257
811 84 S 282
53 W 368.70 S 17 27 W
45 W 422.27 $ 17 43 W
40 W 478,15 S 17 57 W
53 W 536.77 S 18 11 W
76 W 598.19 5 18 24 W
75 W 662.08 S 18 34 W
70 W 727.19 5 18 45 W
85 W 793.03 $ 18 58 W
51 W 859.59 S 19 11 W
1.26 873.42 S 307.46 W 925.96 S 19 24 W
0.85 933.72 S 333,02 W 991.33 S 19 38 W
0.94 993.41 S 359.66 W 1056,.51 S 19 54 W
1.21 1053.72 S 387.36 W 1122.66 S 20 11 W
0.56 1114.95 S 416.15 W 1190,08 S 20 28 W
1.21 1176.72 S 445.38 W 1258.18 S 20 44 W
1.21 1239,02 S 475.69 W 1327.19 5 21 0 W
2.34 1301.66 S 508.48 W 1397.45 S 21 20 W
0.40 1364.34 S 544.31 W 1468.91 S 21 45 W
0,48 1427:11 S 580.96 W 1540.83 S 22 9 W
0 40 1490.18 $ 618,08 W 1613.28 5 22 32 W
0 75 1553.32 S 655.51 W 1685.97 5 22 53 W
0 81 1615.89 5 692.80 W 1758.15 S 23 12 W
0 69 1677.94 S 729.64 W 1829.72 5 23 30 W
0 33 1739.28 S 765.82 W 1900.42 S 23 46 W
1 55 1799.79 S 801,53 W 1970.21 S 24 0 W
1 13 1859,22 5 836,42 W 2038,70 S 24 13 W
1,28 1917,70 S 870,64 W 2106,08 S 24 25 W
1,37 1974,72 S 903,82 W 2171,73 5 24 36 W
0.64 2030.00 S 935.74 W 2235.28 5 24 45 W
0.52 2084.39 5 967,19 W 2297.86 S 24 54 W
0.19 2138.47 S 998.37 W 2360 04 5 25 2 W
0,25 2192,35 S 1029,38 W 2421
0,36 2246,01 S 1060,20 W 2483
0,41 2299.37 S 1090,96 W 2545
0,19 2352,35 5 1121,59 W 2606
0,22 2404.92 S 1152,10 W 2666
0,10 2457,23 5 1182,55 W 2726
0.46 2509,20 5 1212,72 W 2786
0,46 2560,58 5 1242.61 W 2846
99 S 25 9 W
66 S 25 16 W
05 S 25 23 W
O5 S 25 29 W
64 $ 25 36 W
98 S 25 42 W
89 S 25 48 W
16 5 25 53 W
COMPUTAT[ON DATE: 05-JAN-92
PAGE 3
BP EXPLORATION
F-40 (12-11-11-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 03-DEC-1991
KELLY BUSHING ELEVATION: 67.40 FT
ENGINEER: M.MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN
8000.00 6970.99 6903.59 35 49 S 27 12 W 2904.62
8100.00 7052 34 6984.94 35 15 S 24 20 W 2962.76
8200,00 7134 43 7067.03 34 21 5 23 48 W 3019.78
8300.00 7217 42 7150,02 33 33 $ 24 18 W 3075.51
8400.00 7301 09 7233.69 32 52 S 25 19 W 3130.24
8500.00 7385 32 7317.92 32 33 S 26 56 W 3184.13
8600.00 7469 25 7401.85 33 28 S 28 23 W 3238.49
8700.00 7552 17 7484.77 34 26 $ 30 5 W 3294.33
8800.00 7634.12 7566.72 35 27 S 31 16 W 3351.50
8900.00 7715.19 7647,79 36 11 S 31 40 W 3409.85
2.61 2612.02 S 1271.26 W 2904 95 5 25 57 W
1.66 2664.46 S 1296.39 W 2963
1.27 2716.68 S 1319.50 W 3020
0.96 2767.66 S 1342.18 W 3075
1.26 2817.40 S 1365.10 W 3130
0.85 2865.78 S 1388.85 W 3184
1.50 2913.92 S 1414.10 W 3238
1,33 2962.72 S 1441.34 W 3294
0.95 3011.96 S 1470.65 W 3351
0.44 3061.88 S 1501.24 W 3410
11 S 25 57 W
17 S 25 54 W
93 S 25 52 w
69 S 25 51 w
58 S 25 51 w
92 S 25 53 W
72 S 25 57 w
82 S 26 1W
11 S 26 7 W
9000.00 7795.53 7728.13 37 0 S 32 13 W 3469,17
9100.00 7874.66 7807.26 38 22 S 33 16 W 3529.98
9200.00 7952.61 7865.21 39 10 5 35 5 W 3592.11
9300.00 8029,69 7962.29 39 58 $ 36 54 W 3654,99
9400 O0 8105.59 8038.19 41 28 S 37 1 W 3719.00
9500 O0 8179.43 8112.03 43 8 S 33 18 W 3785,71
9600 O0 8252.59 8185.19 42 39 S 33 34 W 3853.46
9700 O0 8325.83 8258.43 43 55 5 30 44 W 3921.21
9800 O0 8397.57 8330.17 43 54 5 33 17 W 3990.63
9900 O0 8470.25 8402.85 43 10 S 36 23 W 4058.61
1,11 3112.44 S 1532 70 W 3469,36 S 26 13 W
1.41 3163.88 S 1565
1.47 3215.74 S 1600
1.59 3267.26 S 1638
3.02 3319.05 5 1677
1.80 3374.20 5 1716
1.26 3431.23 S 1753
2.48 3488.71 S 1790
0.47 3548.10 S 1826
1.58 3604.37 5 1866
74 W 3530.11 S 26 20 W
85 W 3592.17 S 26 28 W
31 W 3655,01 5 26 38 W
77 W 3719.00 S 26 49 W
54 W 3785.73 S 26 58 W
89 W 3853.50 S 27 4 W
34 W 3921.28 5 27 10 W
74 W 3990.74 S 27 14 W
11 W 4058.80 S 27 22 W
10000 O0 8543.27 8475.87 42 50 S 38 32 W 4125 81
10100 O0 6617.20 8549.80 41 44 S 39 38 W 4191 53
10200 O0 8692.34 8624.94 41 10 5 38 32 W 4256 O0
10300 O0 8767.25 8699.85 41 52 5 37 29 W 4320 98
10400 O0 8841.09 8773.69 42 50 S 35 41 W 4387 41
10500 O0 8913,94 8846.54 43 54 5 32 33 W 4455 36
10600 O0 8985.13 8917,73 45 9 S 32 6 W 4525 28
10700 O0 9055.27 8987.87 46 4 S 32 2 W 4596 26
10800.00 9124.32 9056.92 46 20 S 32 10 W 4668.24
10880.00 9179.55 9112.15 46 20 S 32 10 W 4725.86
2.62 3658,77 S 1907 45 W 4126.13 S 27 32 W
1.85 3710.81 S 1950
0.78 3762.01 S 1991
1.42 3814.19 S 2032
2.21 3868.26 S 2072
2.24 3925.04 S 2111
0.75 3984.48 S 2148
1.83 4044.87 S 2186
0.00 4106.08 $ 2224
0.00 4155.08 S 2255
17 W 4192.05 S 27 43 W
79 W 4256.75 S 27 54 W
59 W 4321'.98 S 28 3 W
89 W 4388.66 S 28 11 W
18 W 4456.80 S 28 16 W
59 W 4526.87 S 28 20 W
45 W 4597.99 5 28 24 W
91 W 4670.13 S 28 27 W
71 W 4727.89 S 28 30 W
COMPUTATION DATE= 05-JAN-92 PAGE
BP EXPLORATION
F-40 (12-11-11-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 03-DEC-1991
KELLY BUSHING ELEVATION: 67.40 FT
ENGINEER: M.MCBR[DE
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERT[CAL DOGLEG RECTANGULAR COORDINATES HOR[Z. DEPARTURE
MEASURED VERTICAL VERTZCAL DEVZATION AZIMUTH SECT[ON SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MZN DEG M[N FEET DEG/IO0 FEET FEET FEET DEG
0.00
1000.00 999 99 932.59 0 28 N 48 4 E
2000 O0 1999
3000 O0 2999
4000 O0 3943
5000 O0 4733
6000 O0 5455
7000 O0 6177
8000 O0 6970
9000 O0 7795
0
91 1932.51 0 41 S 53 22 E -4
68 2932.28 4 3 S 26 42 W 7
06 3875 66 29 42 S 19 15 W 313
50 4666 10 41 6 S 22 22 W 918
01 5387 61 47 18 S 30 34 W 1608
94 6110 54 38 46 S 29 59 W 2296
99 6903 59 35 49 S 27 12 W 2904
53 7728 13 37 0 S 32 13 W 3469
0.00 -67.40 0 0 N 0 0 E 0 O0
76
53
76
16
19
75
56
62
17
0 O0
0
0
4
2
1
0
0
2
1
0.00 N
09 1.68 S
O0 1.24 S 12
22 14.00 S 10
51 303 55 S 93
26 873 42 S 307
40 1490 18 S 618
52 2084 39 S 967
61 2612 02 S 1271
11 3112 44 S 1532
0.00 E 0.00 N 0 0 E
1 63 E 2.34 S 44 11 E
49 E 12.55 S 84 20 E
48 E 17.48 S 36 49 E
71 W 317.69 S 17 9 W
46 W 925.96 S 19 24 W
08 W 1613.28 S 22 32 W
19 W 2297.86 S 24 54 W
26 W 2904.95 S 25 57 W
70 W 3469.36 S 26 13 W
10000.00 8543.27 8475.87 42 50 S 38 32 W 4125.81 2.62 3658.77 S 1907.45 W 4126.13 S 27 32 W
10880.00 9179,55 9112.15 46 20 S 32 10 W 4725.86 0.00 4155.06 S 2255.71 W 4727.89 S 28 30 W
COMPUTATION DATE: 05-JAN-92 PAGE 5
BP EXPLORATION
F-40 (12-11-11-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 03-DEC-1991
KELLY BUSHING ELEVATION: 67.40 FT
ENGINEER: M.MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
.MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG
0.00 0.00 -67.40 0 0 N '0 0 E
67.40 67.40 0.00 0 0 N 0 0 E
167.40 167.40 100.00 0 20 $ 35 48 W
267.40 267.40 200.00 0 13 5 13 5 W
367.40 367.40 300.00 0 18 S 19 38 W
467.40 467.40 400.00 0 20 $ 16 52 E
567.41 567.40 500.00 0 14 S 47 13 E
667.41 667.40 600.00 0 15 S 80 51 E
767.41 767.40 700.00 0 20 N 75 16 E
867.41 867.40 800.00 0 15 N 83 29 E
0 O0
0 O0
0 42
0 92
1 29
1 80
2 O0
2 O0
1 76
1 45
0.00 0.00 N 0.00 E
0.00 0.00 N 0.00 E
0.00 0.31 S 0.33 W
0.00 0.76 S 0.54 W
0.17 1.10 5 0.67 W
0.19 1.66 S 0.72 W
0.00 2.01 S 0.46 W
0.10 2.19 S 0.10 W
0.21 2.16 S 0.42 E
0.33 2.03 S 0.79 E
0.00 N 0 0 E
0.00 N 0 0 E
0.45 S 46 38 W
0.93 S 35 9 W
1 29 S 31 25 W
1 81 S 23 29 W
2 06 S 12 50 W
2 19 S 2 37 W
2 22 S 10 50 E
2 18 S 21 23 E
967.41 967.40 900.00
1067.41 1067 40 1000.00
1167,42 1167 40 1100.00
1267.44 1267 40 1200.00
1367.46 1367 40 1300.00
1467.47 1467 40 1400.00
1567.48 1567 40 1500.00
1667,48 1667 40 1600.00
1767.48 1767.40 1700.00
1B67.49 1867.40 1800.00
0 28 N 60 7 E
0 27 N 54 5 E
1 4 N 88 28 E
1 1 N 72 38 E
1 8 N 77 59 E
0 43 N 64 31 E
032 S 81 0 E
0 34 S 54 55 E
0 17 S 63 12 E
0 27 S 67 2 E
1 .00
0.28
-0.53
-1 .65
-2.87
-4.00
-4.67
-4.62
-4.63
-4.53
0.37
0.34
0.21
0.13
0.12
0.73
0.30
0.85
0.13
0.29
164 S
1 33 S
1 08 S
074 S
0 30 S
0 16 N
0,40 N
0 04 S
0 34 S
0 71 S
1.42 E
2.02 E
3.33 E
5.13 E
6.95 E
8.55 E
9.55 E
10.32 E
10.94 E
11.46 E
2 32 S 37 33 E
2 42 S 56 37 E
3 50 $ 71 58 E
5 18 S 81 46 E
6 95 S 87 31 E
8 55 N 88 54 E
9.56 N 87 36 E
10.32 $ 89 47 E
10.94 5 88 12 E
11.48 5 86 26 E
1967.49 1967 40 1900.00
2067.50 2067 40 2000 O0
2167.50 2167 40 2100 O0
2267.50 2267 40 2200 O0
2367.50 2367 40 2300 O0
2467.51 2467 40 2400 O0
2567.51 2567 40 2500 O0
2667.51 2667.40 2600 O0
2767.52 2767.40 2700 O0
2867.57 2867.40 2800.00
0 35 S 56 6 E
0 43 S 54 51 E
0 25 S 67 58 E
0 21 S 39 10 E
0 19 S 16 37 E
0 23 S 23 16 E
0 27 S 21 18 E
0 24 5 14 48 E
1 5 S 23 59 W
2 18 S 32 20 W
-4 59
-4 39
-4 40
-4 35
-4
-3
-3
-2
-1
1
07
61
12
64
46
46
0.87
0.00
0.00
0.78
0.14
0.00
0.31
0.22
O. 68
0.49
1.02 S
1.73 S
2.16 S
2.48 S
2.96 S
3.57 5
4.20 S
4.88 S
6.06 S
8.62 S
12.19 E
13.16 E
14,01 E
14.55 E
14.89 E
15.05 E
15,24 E
15.50 E
15.24 E
13.81 E
12.23 S 85 13 E
13.27 S 82 31 E
14.18 S 81 15 E
14.76 S 80 20 E
15.18 $ 78 45 E
15.47 S 76 40 E
15.81 5 74 35 E
16.25 S 72 32 E
16.40 S 68 18 E
16.28 5 58 2 E
2967.66 2967.40 2900.00 2 57
3068.01 3067.40 3000.00 6 22
3169.07 3167.40 3100.00 9 56
3271.17 3267.40 3200.00 13 10
3374.55 3367 40 3300.00 15 50
3478.93 3467 40 3400.00 17 47
3584.76 3567 40 3500.00 20 31
3692.34 3667 40 3600.00 22 42
3801.87 3767 40 3700.00 25 28
3913.76 3867 40 3800.00 27 43
S 32 31W
S 20 2O w
S 21 21W
S 21 35 W
5 19 39 W
S 19 49 W
S 19 52 W
S 18 44 W
S 19 30 W
S 19 21 w
5.81
13.95
28.33
48.82
74.85
104.50
138.84
178.18
222.41
272.17
2.41
3.75
4.06
4.01
1.98
2.97
3.16
2.15
2.65
1 .84
12 29 S
19 78 S
33 29 S
52 35 S
76 86 S
105 O4 S
137 57 S
174 96 S
217 17 S
264 51 S
11.44 E 16.79 S 42 57 E
8.19 E 21.41 5 22 30 E
3.05 E 33.43 5 5 14 E
4.66 W 52 56 S 5 5 W
13.87 W 78 10 S 10 14 W
23.83 W 107 71 S 12 47 W
35.60 W 142 10 S 14 31 W
48.86 W 181 65 5 15 36 W
63.38 W 226 23 S 16 16 W
80.03 W 276.35 S 16 50 W
BP EXPLORATION
F-40 (12-11-11-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
COMPUTATION DATE: 05-JAN-92
PAGE 6
DATE OF SURVEY: 03-DEC-1991
KELLY BUSHING ELEVATION: 67,40 FT
ENGINEER: M,MCBRIDE
[NTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE vERTICAL DOGLEG RECTANGULAR COORDINATES HOR[Z. DEPARTURE
MEASURED VERTICAL VERTICAL DEVZATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MZN DEG MZN FEET DEG/IO0 FEET FEET FEET DEG
4028.09 3967.40 3900.00 30 21
4145.21 4067.40 4000.00 32 19
4264.83 4167.40 4100.00 34 16
4387.55 4267.40 4200.00 36 41
4514.43 4367.40 4300.00 39 12
4645.07 4467.40 4400.00 40 40
4777.57 4567.40 4500.00 41 23
4911.62 4667.40 4600.00 41 59
5044.92 4767.40 4700.00 40 55
5177.05 4867.40 4800.00 40 49
S 19 12 W 327.07
S 19 32 W 387.51
S 19 52 W 452.63
S 20 10 W 523.26
S 20 9 w 600.81
S 20 33 w 684.29
S 21 35 w 770.81
S 21 53 w 859.72
S 22 53 w 947.58
S 24 13 w 1033.81
5310.62 4967.40 4900.00 42 19 S 25 10 W 1122 29
5446.75 5067.40 5000.00 43 2 S 25 15 W 1214 61
5584.83 5167.40 5100.00 44 7 S 26 15 W 1309 80
5726.45 5267 40 5200.00 46 7 S 29 35 W 1410 04
5871.59 5367 40 5300.00 46 40 S 30 19 W 1515 06
6018.28 5467 40 5400.00 47 19 S 30 37 W 1622 16
6165.01 5567 40 5500.00 46 42 S 30 49 W 1729 29
6309.64 5667 40 5600.00 45 46 S 30 37 W 1833.54
6451.60 5767 40 5700.00 44 42 S 30 35 W 1934.07
6590.27 5867 40 5800.00 43 16 S 30 22 W 2029.95
6726.07 5967 40 5900.00 41 46 S 30 20 W 2121.65
6857.68 6067 40 6000.00 39 33
6986.47 6167 40 6100.00 38 49
7114.49 6267 40 6200.00 38 30
7242.05 6367 40 6300.00 38 15
7369.14 6467 40 6400.00 38 0
7495.68 6567 40 6500.00 37 36
7621.60 6667.40 6600.00 37 22
7747.07 6767.40 6700.00 36 58
7871.73 6867.40 6800.00 36 21
S 3O 1W 2207.06
S 30 0 W 2288.09
S 29 57 W 2367.90
S 29 52 W 2446.98
S 29 59 W 2525.30
S 30 5 W 2602.72
S 30 16 W 2679.12
S 30 9 W 2754.75
S 30 16 W 2829.07
7995.57 6967.40 6900.00 35 51
8118.44 7067.40 7000.00 35 4
8239.84 7167.40 7100.00 33 59
8359.83 7267.40 7200.00 33 8
8478.75 7367.40 7300.00 32 31
8597.78 7467.40 7400.00 33 26
8718.50 7567.40 7500.00 34 37
8840.94 7667.40 7600.00 35 48
8964.86 7767.40 7700.00 36 39
9090.74 7867.40 7800.00 38 16
S 27 24 W 2902.02
S 23 56 W 2973.39
S 23 53 W 3042.13
S 24 48 W 3108.38
S 26 37 W 3172.70
S 28 21 W 3237.27
S 30 23 W 3304.82
S 31 29 W 3375.27
S 31 57 W 3448.19
$ 33 8 W 3524.27
2.15
1 .60
1 .75
2.29
1 85
1 19
0 65
0 64
1 09
0 38
0.98
0.42
0.98
1 .61
0.51
0.28
0.37
0.82
1 .45
1 .01
1 .56
1 .42
0.48
0.20
0.16
0.20
0.19
0.26
0.36
0.47
2.67
1.28
0.59
0.62
0.73
1 .51
1 .38
0.87
1 .01
1.42
316.78 S
374.32 S 118
436.10 S 140
502.93 S 164
576 20 S 191
655 09 S 220
736 12 S 252
819 05 S 285
900 63 S 318
979 71S 353
98 33 W 331 69 S 17 15 W
49 W 392
61W 458
95 W 529
91W 6O7
92 W 691
38 W 778
41W 867
78 W 955
48 W 1041
62 S 17 34 W
2O S 17 52 W
29 S 18 9 W
32 S 18 25 W
33 5 18 38 W
18 S 18 55 W
35 S 19 13 W
39 S 19 29 W
53 S 19 5O W
1060.19 S 390.40 W 1129 79 S 20 13 W
1143.77 S 429.70 W 1221
1229.54 S 471.03 W 1316
1318.25 5 517.74 W 1416
1409,25 $ 570.50 W 1520
1501.75 S 624.92 W 1626
1594.05 S 679.79 W 1732
1683.89 S 733.15 W 1836
1770.66 S 784.33 W 1936
82 $ 20 35 W
68 S 20 58 W
27 S 21 27 W
35 5 22 2 W
58 $ 22 36 W
94 S 23 6 W
57 S 23 32 W
6O S 23 53 W
1853.47 S 833.05 W 2032.07 S 24 12 W
1932.76 S 879.45 W 2123.44 S 24 28 W
2006.79 S 922.33 W 2208.59 S 24 41 W
2077.05 S 962.95 W 2289.41 S 24 52 W
2146.29 5 1002.88 W 2369.04 S 25 3 W
2214.95 5 1042.35 W 2447.96 S 25 12 W
2282.93 5 1081.47 W 2526.13 S 25 21 W
2350.07 S 1120.27 W 2603.42 S 25 29 W
2416.24 5 1158.69 W 2679.70 S 25 37 W
2481,74 5 1196.78 W 2755.24 S 25 45 W
2546.11 5 1234.18 W 2829.47 S 25 52 W
2609 72 S 1270.04 W 2902.35 S 25 57 W
2674
2737
2797
2855
2912
2971
3032
3094
3159
16 S 1300.77 W 2973.74 S 25 56 W
14 5 1328.54 W 3042.53 S 25 53 W
58 5 1355.84 W 3108.82 S 25 51 W
57 5 1383.70 W 3173.16 5 25 51 W
84 5 1413.52 W 3237.70 5 25 53 W
79 5 1446.64 W 3305.20 S 25 57 W
31 5 1483.07 W 3375.56 S 26 4 W
59 S 1521.51 W 3448.40 S 26 11 W
07 S 1562.58 W 3524.40 5 26 19 W
BP EXPLORATION
F-40 (12-11-11-13)
PRUDHOE BAY
NORTH SLOPE, ALASKA
COMPUTATION DATE: 05-JAN-92 PAGE 7
DATE OF SURVEY: 03-DEC-1991
KELLY BUSHING ELEVATION: 67.40 FT
ENGINEER: M.MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
NEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN
9219.11 7967 40 7900 O0 39 19
9349.40 8067
9483.55 8167
9620.13 8267
9757.99 8367
9896.09 8467
10032.83 8567
10166.88 8667
103D0.20 8767
10435.94 8867
40 8000
40 8100
40 8200
40 8300
40 8400
40 8500
40 8600
40 8700
40 8800
O0 40 31
O0 43 1
O0 42 36
O0 44 11
O0 43 10
O0 42 31
O0 41 6
O0 41 52
O0 43 2
10574.91 8967.40 8900.00 44 57
10717.54 9067.40 9000.00 46 20
1D862.40 9167.40 9100.00 46 20
10880.00 9179.55 9112.15 46 20
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEG MIN FEET DEG/IO0
S 35 27 W 3604 08
S 37 36 W 3686
S 33 43 W 3774
S 33 22 W 3867
S 31 37 W 3961
S 36 19 W 4055
S 39 27 W 4147
S 38 55 W 4234
S 37 29 W 4321
S 34 25 W 4411
1.47
36 1.49
58 2.44
O0 1.66
55 2.85
98 1.79
58 1.65
68 0.97
11 1o42
63 2.89
S 32 4 W 4507.60
S 32 10 W 4608.87
S 32 10 w 4713.18
S 32 10 W 4725.86
0.98
0.02
0.00
0.00
FEET FEET FEET DEG MIN
3225.61 S 1607 86 W 3604.13 5 26 30 W
3292.66 5 1657
3364.86 5 1710
3442.61 S 1761
3523.45 5 1811
3602.22 5 1864
3676.09 S 1921
3745.02 S 1978
3814.30 S 2032
3888.29 S 2086
62 W 3686.37 S 26 43 W
32 W 3774.59 S 26 57 W
39 W 3867.05 S 27 6 W
05 W 3961 64 S 27 12 W
53 W 4056 16 S 27 22 W
43 W 4147 96 S 27 36 W
15 W 4235 36 $ 27 51 W
68 W 4322 11 S 28 3 W
95 W 4412 96 S 28 13 w
3969.44 5 2139.16 W 4509.15 5 28 19 W
4055.60 S 2193.18 W 4610.63 5 28 24 W
4144.30 5 2248.93 W 4715.18 5 28 29 W
4155.08 5 2255.71 W 4727.89 5 28 30 W
DIRECTIONAL SURVEY
COMPANY BP EXPLORATION
FIE~.O PRUDHOE BAY
w~u. F-40 (12..11-11-13)
COUNTRY USA
nUN ONE
DATE L(:~qED
DEFT. UNIT
DEC - 91
REFERENCE
14ELL' F-40 (12_11_11_13)
(3005' FNL,2884' FEL ,SEC 2, T11N,R13E)
HORIZONTAL PROJECTION
lOOO
looo
WE, LL'F-40 (12-11-11-13)
(3005' FNL,2884' FEL,SEC 2,T11N,R13E)
VERTICAL PROJECTION
-1000
AOGCC G£OLOGICAL MAT£FUALS INVFN[OFIY LIST
P[HMII- ,~ ~ / - / //9 WILL NAME ../~,.,~/.// ~ -'- /o
COU~"_~.O..^'~ / -"- ;. /~ ~ ~'/CO. CO"~^C~ & "0. , ~.~2<"...
fo,.. . , ,...:.;...;~ ~,~;'. .... ~-.~...~ ~...,.,... ............
'd§, '>'~Y."~) "0 //'//~o/,~'.;-'-'-'-'-'-'-'-'-~-1 ' ~:,ml;i~i~. repo"
403' yes no sundry. 'applicailan
"404 yes no ---------~ report of sundry applicalion
, , ,= ,, ,, , , ,,, ,, , , ,,,
Open required received Caged required received Producllo~i required received
I!ole Io§ ..... hole log ...... I_O_Q ,
MUD GC]' 'IEMP
......
DIL/SFL . ~ ~ CNL. PI1OD
DLL CHl: PI-lESS
'BHC/sL CET ' ' ' SPiHHEF!
....... ._: ..... :_ , ~, _ _ ~u,., ~_ ........
EIIIO/AC ~ ~ Em 01HEFI DATA
sss "~ mca<in ........ Digiini .....
CHi_ ¢ ~ Well
, , _ -~ ;
:= FDC- '~ FIWD required ,cccivcd SAi~PL~S required received
MWD
LDTICNL ' ' d~/ditch'
_ , ~ ......
ML core
CYBEfl core
LOOK ..... ~,plFsis _.
~S
.......
N~r .......................
, .............
_ . ., ..........
.
~ ~ ~ ........ ,
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 01/28/92
T# 83212
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
, ,, ~ ..,//~._
J~ERF 01/05/92 #1
J A-07 ?~-~/ PITS 01/11/92 #1
~/ R-06 f~3-A-INJ 01/15/92 #1
~/IN-19 ~].-]~ CCL/PE~ 01/02/92
N-19 PE~ 12/31/92
-_ ~///
___~JS-08~'~ ~ 0Z/Z~/92
C_~-07-g~ LE~ DET 01/18/92
/-
9792.00-10683.00 HLS
9840.00-11790.00 HLS
9750.00-10082.00 HLS
9156.00- 9770.00 HLS
9100.00- 9750.00 HLS
9001.00- 9205.00 HLS
1740.00-10602.00 HLS
5
5
5
5
2
Information Control
Well Records
Adrian J. Martin
RECEIVED
FEB 1 2_ !99;"
Alaska 0il & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DATE' 12/30/91
T#: 83135
ARCHIVES
SYSTEM Tape & Transmittal Only
BP MAGNETIC,, LI~ TAPE ,~ LI,.~TIN~
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4004.
F-40 OH/DIFL/BHC-AL/CN-GR/FIN #1 11/12J91 7658-10915 ATLAS
1600B PI A P 1#50-029-22215 R E F#96973 TP#8222
RECEIVED
JAN 0 8 1992
Alaska 0il & Gas Cons. Commission
Anchorage
Information Control
Well Records LR 2-1
Adrian J. Martin
BP EXPLORATION
BP ExoIoration (Alaska) Inc,
gOO East Benson Bouievarcl
P.O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
DATE: 12/11/91
T~ 83085
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
12/03/91 ~1
12/04/91 ~1
12/05/91 #1
11/09/91 ~3
11/19/91 ~1
11/17/91 #1
11/16/91 #1
10/21/91 #1
11/28/91 ~1
11/28/91 #1
9468.00-10768.00 SCH
9560.00-10680.00 SCH
10100.00-10632.00 SCH
9822.00-10206.00 HLS
9250.00- 9626.00 HLS
12103.00-12482.00 HLS
12330.00-12645.00 HLS
10230.00-10320.00 HLS
11040.00-11040.00 SCH
10950.00-11172.00 SCH
5 "
5 "
5 "
5 "
5 "
5 "
5 "
,,
5 "
Information Control
Well Records
Adrian J. Martin
RECEIVED
DEC 1 8 199i
'_Alaska 0ii & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
11/20/91
DATE:
T# 83025
BP OPEN HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
F-40 ~H/'B~ ~ \.~ 11/12/91 ~1 10004.00-10840.00 ATLAS 2/5"
[~~-~o ~ ~/~/~ ~ ~ooo~.oo-~o~.oo ~s
/ss LT 11/12/91 #1 7700.00-10811.00 ATLAS 5 "
F-40 VD 11/12/91 #1 10004.00-10868.00 ATLAS 2 "
Adrian J. Martin
TO:
THRU:
MEMORAN DUM Sta e of Alaska
ALAs~ OIL AND (]AS CONSERYATION CO~ISSION
LonnSe C. Smi//~/ DATE: Nov. 11,1991
Commissioner '
FILE NO: DA.iI11.3
Blair Wondzell
Sr. Petroleum Engineer
TELEPHONE NO:
SUBJECT:BOP Test
BPX PBU F-40
Permit No. 91-].17
Prudhoe Oil Pool
FROM: Doug Amo~
Petroleum Inspector
Tuesday_ No__y, .5.,~!991: I traveled this date from Conoco's MPU
J-7 well to BPX PBU F-40 well to stand by for the BOP test
on Nabors Rig No. 18E,
Wednesday Nov. 6,1991: The testing commenced at 6:30 am and
was concluded at 11:30 am. As the attached AOGCC BOP Test
Report indicate~ there were two failures during this test.
The lower API ring in the csg spool and the mud pit H2S
sensor were replaced and retested during the course of this
test.
In summary, I witnessed the BOP Test at BPX PBU F-40 well on
Nabors Rig No. t8E. The two failures encountered during the
test were repaired and retested.
Attachment.
02-00lA (Rev. 6/89)
20/ilfMEMO1.PM3
STATE OF ALASKA
ALASKA OIL AND CAS CONSERVATION COMMISSION
OPERATION:
Operator
Drlg ~
Wkvr
Location: Sec ~ T ///k/
Drl g contrctr.. /~,//;~~J
Location (general) /
Housekeeping (general) tw~
Reserve pit ~
Well sign,
Rig
MUD SYSTEMS:
Trip tank
Pit gauge
Flow monitor
Gas detectors
Visual Audio
J ~
BOPE STACK:
· ! i
Annular preventer
Pipe rams ~~
Blind rams
Choke line valves
HCR valve ~&b¢
Kill line valves
Check valve
Test Pressure
I,
TEST RESULTS: - Failures
Test time
BOP Test Report
TEST: Initial~ Weekly. k~ Other
Representative ~'A~r~.?: ,~,,~/i>rl/j
Rig#
mir
mir
ACCUMULATOR SYSTEM: I~ ', 'Y ~ '. 4 ~
Full charge pressure '~)::)
Press after closure / ~0~)
Pump iner clos press 200 psig
Full charge press attained ~
Controls: Master .~-
psig
psig
sec
sec
Remote
Blind switch cover_~
KELLY AND FLOOR SAFETY VALVES:
Upper Kelly
Lower Kelly
Ball type
Inside BOP
Choke manifold
Number valves
Number flanges
Adjustable chokes
Hydraulically operated choke
hrs
~' Test pressure
Test pressure
Test pressure
Test pressure
Test pressure II
/
//Ii/
/[/
Remarks:
Repair or replacement of failed equipment to be made within / days. Notify
the Inspector, and follow with written/FAXed verification to Commission office.
Distribution:
orig - AOGCC
c - Operator
c - Supervisor
C.004 (rev 07/08/91)
WITNESS
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
September 16, 1991
Karen Thomas
PBU Senior Technical Assistant
BP Exploration (Alaska), Inc.
P. O. Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Unit F-40
BP Exploration (Alaska), Inc.
Permit No. 91-117
Sur. Loc. 3005'SNL, 2884'WEL, Sec. 02, TllN, R13E, UM
Btmnhole Loc. 1961'SNL, 5031'WEL, Sec. 11, TllN, R13E, UM
Dear Ms. Thomas:
Enclosed is the approved application for permit to drill the above
referenced well.
The permit to drill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
The Commission will advise you of those BOPE tests that it wishes to
witness.
S'~rman
Alaska Oil d~e~..~s Conservation Commission
BY ORDER OF THE COMMISSION
dlf / Enclosures
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
:la. Type of work Drill [] RedrillDIlb. Type of well. Exploratory E] Stratigraphic Test i-] Development Oil[]
Re-Entry [] DeepenI-II Service [] Development Gas [] SingleZone [] Multiple Zone[]
2. Name of Operator 5. Datum Elevation (DF or KB) I10. Field and Pool
BP Exploration KBE = 65'feet Prudhoe Bay Fieid/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28280
4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(~,,, 20 AAC 25.025)
3005' SNL, 2884' WEL, SEC. 02, T11N, R13E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
1800' SNL, 4950' WEL, SEC. 11, T11N, R13E F-40 (12-11-11-13) 2S100302630-277
At total depth 9. Approximate spud date Amount
1961' SNL, 5031' WEL, SEC. 11, T11N, R13E September 17, 1991 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MD and TVD)
property line
ADL 28281 @ 247' feet F-04 @ 2199'/10' feet 2560 10871 'MD/9188'TVI3eet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 2soo{eet Maximum hole angle4o, sso Maximum surface 3330psig At total depth (TVD) ~800'/4390Psig
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
20" Cond. 80' Surface 110' 110'
13-1/2" 10-3/4" 45.5tt L-80 Butt 2650' Surface 2680' 2680' 2440 cu fi Arcticset III & II
9-7/8" 7-5/8" 29. 7# ~rgs,.s NS CC 9960' Surface 9990' 8519' 1500 cu ft C/ass G
6-3/4" 5-1/2" 17# ~r,3cR.8~ FL4S 1131' 9740' 8329' 10871' 9188' 210 cu fl Class G
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor
Surface
IntermediateSEP 1991
Production
Liner l~iiii$~! Ojj.~ ~.c~l¢~i;..~i$$lo~
Perforation depth: measured
true vertical "~ ~~~
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program I-x]
!Drilling fluid program [] Time vs depth pict [] Refraction analysis[-] Seabed report[] 20 AAC 25.050 requirements[]
21. I hereby ce~y that the foregoing is true and correct to the best of my knowledge
Signed ~ ,,~x~-,,k--. ~ ,~ Title PBU Senior TechnicalAssistant Date
""' J'"' Commission Use Only
Permit Number IAPI number IApproval date See cover letter
c~/./,///~ 150-o2._'::/-- ~____~_~.,/~' I ~.-/~ ~,~i for other requirements
·
Conditions of approval Samples required [] Yes ...~No Mud Icg required l-lYes.'l~ No
Hydrogen sulfide measures [] Yes ,,~J~ Directiortal.survey requ~recl ~Yes
•-No
Required w~qj;J~;~=pr.e, ss~re ~2M; 1-13M; ~]~i[5M; []1 OM; []15M;
by order of
,_Appro. v_e. _..... ., .... Commissioner Ine commission Date ?/¢//~/
PRELIMINARY WELL PLAN
Well: F-40
[12-11-11-13]
PBU
LOCATION: Surface: 3005'
Target: 1800'
T.D.: 1961'
SNL, 2884' WEL, Sec. 2, T11 N, R13E
SNL, 4950' WEL, Sec. 11, T11 N, R13E
SNL, 5031' WEL, Sec. 11, T11 N, R13E
ESTIMATED START:
Sept. 10th, 1991
OPR. DAYS TO COMPLETE: 22 (17 days drilling, 5 days completion)
CONTRACTOR:
Nabors 18E
MAX ANGLE/SECT COURSE/KOP/BUILD RATE: 40.58/S 26.8° W/2800'/2.5
Item TVDss MD(BKB) Mud Wt.
20" CONDUCTOR
10-3/4" SHOE
BASE WEST SAK FORMATION
7-5/8" SHOE
TOP SAG RIVER SANDSTONE
CURRENT GOC
TOP SADLEROCHIT
TARGET
TOTAL DEPTH
80 8.5
2615 268O 9.5
5825 6528 9.0
8453 9990 9.7
8462 10000 8.8
8860 10525 8.8
8578 10153 8.8
8912 10593 8.8
9123 10871 8.8
LOGGING PROGRAM:
open Hole - Record all logs on magnetic tape where applicable.
9-7/8" Hole: None
6-3/4" Hole: DIL/BHCS/CNL/GR. Optional LDT/GR
Ca, sed Hole
CBT/CET and Gyro survey after rig release.
SS: 8-26-91
PRF_.,_IlVIlNARY WELL PLAh
WELL F-40 [12-11-11-13_].
PBU
20" Conductor
Ball Valve
10-3/4" casing
13-1/2" hole TD
4-1/2" 12.6# L-80 TDS tubing with GLM's
7-5/8" Packer
5-1/2" Tieback Assembly
7-5/8" Shoe
9-7/8" Open Hole
5-1/2" 17# NT13Cr-80 FL4S Liner
6-3/4" PBTD
5-1/2" Liner Shoe
6-3/4" Open Hole
PROPOSED
DEPTH MD/BKB
110'
2100'
2680'
27OO'
9690'
9740'
9990'
10000'
10791'
10871'
10871'
SS 8/26/91
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL F-40 [12-11-11-13] PBU
Install and cement 80' of 20" conductor to surface.
The Drilling fluid program will consist of an 8.5 - 9.5 ppg spud mud in the 13-
1/2" hole, a 9.0 - 9.7 ppg water base mud in the 9-7/8" hole and an 8.8 ppg
water based mud in the 6-3/4" hole.
Drill 13-1/2" hole to 2700'. Run and cement 10-3/4" L-80 Buttress casing to
surface.
Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams,
blind rams, and annular preventer. Maximum possible bottomhole pressure is
4390 psi at 8800' TVDss based on original reservoir pressure. Maximum
possible surface pressure is 3330 psi based on a gas column to surface from
8600' TVDss and an oil column to 8800' TVDss.
A formation leak-off test will be performed 10' below the 10-3/4" shoe.
Directionally drill 9-7/8" hole to the 7-5/8" casing point above the top of Sag
River Sandstone. Run a 7-5/8" casing string of 29.7# NT-95HS NSCC to within
10' of 9-7/8" TD and cement with Class G cement around the 7-5/8" shoe. The
annulus will be freeze protected by dry crude.
Directionally drill the 8-1/2" hole to TD. Run 5-1/2" liner from TD to 250' inside
7-5/8" casing shoe and cement using Class G cement.
Clean out to 5-1/2" float equipment. Change over to NaCI completion fluid.
Test casing and lap to 3000 psi.
Run 7-5/8" production packer on tubing. Set packer 50' above top of liner. A
subsurface safety valve with dual control lines will be placed 100' below base of
permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test
packer.
The well will be perforated after the rig has been released.
Fluids incidental to the drilling of a well will be pumped down the 7-5/8" x 10-
3/4" annulus of the well.
Tubing Size:
4-1/2", 12.6# L-80, TDS tubing with 5 GLM's.
SS: 8-26-91
BOP STACK CONFIGURATION
13 5/8", 5000 PSI WP
TRIPLE RAM STACK
DRILLING
·
RISER
ANNULAR
PREVENTER
PIPE RAMS
I
BLIND RAMS
I
KILL LINE
MANUAL HYDRAULIC
GATE GATE
DRILLING
SPOOL
P! PE RAMS
4" CHOKE LINE
HYDRAULIC MANUAL
GATE GATE
1' = 5280'
WELL No. F-40
LAT. = 70°20'07.531'
LONG. = 148° 46'01.568"
y = 5,973,792.96 A.S.P.
X = 651,959.21 ZONE
2,273' FROM SOUTH UNE
2,394' FROM WEST UNE
SURVEYOR'S CERTIFICATE
hereby certify that I am properly
registered and licensed to practice
land surveying in the State of Alaska,
and that this plat represents a
survey made by me or under my
supervision, and that all dimensions
and other details are correct.
OCT.~10' 1990 ~No_~/~_ 7335
Registered Lar~l Surveyor
1 2
T12N
T11N
WELL PAD 'F'
WELL No. FI40 ASBUILT
LOCATED IN PROTRACTED SECTION 2,
TOWNSHIP 11 NORTH, RANGE 15 EAST,
UMIAT MEREDIAN, ALASKA
SURVEYED FOR:
B.P. EXPLORATION
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
SURVEYED BY:
ARCTIC SLOPE CONSULTING GROUP
6700 ARCTIC SPUR ROAD
ANCHORAGE, ALASKA 99518
DRAW~ BY: KMC lDATE 10/10/90
I
g L~66_, 'ff),!S¥'-i¥ '30V'UuH,..,N,'r/'-'
dVO~t ~nas .O!i3~V O0,.t9
dr~O~~, ON~ nnsNoo,_..--Jdo~s OLLO~V
~!996~ XO6 'O'd
NO!_LY'~OqdX5 'd'~
¥>!SY'iV 'N¥~d3~ii!.id ±¥'!blO
'".S¥-! ?L l..Ohi¥}J 'H£biON LL dlHSNt¢.Oi
'¥ FIOU. O!5 63iO~'~±O~d Hi Oli'~OOq
~'I~'iSq'~ O'Y--4 'ON IIIP,A
XO~ - -I
,¢
-a-i,V 3 S ON
NLM
N~ Li
$45DUA247:[DRAN033]F40 CLOSAP SHORT7.LIS:2
9-AUG-1991
--- Closest Approach Analysis ---
Date: '9-AUG-91 Time: 10:29:38
Search Radius= 200 7 DEGREE LEAD LINE
For proposed well: F-40 [12-11-11-13]
Location = W-E S-N TVD(SBS)
Top 651959.00 5973793.00 -65.00
Bottom 650438.08 5969291.05 9131.00
Note: Ail depths in feet Below Kelly Bushing (BKB)
10:29
Page
WELL IDENT
Closest Approach
/PROPOSED% /NEARBY%
TVD DEPART TVD DEPART
A029-2008000
F-1 3834.3 247.1 3826.3
A029-2008400
F--2 3694.3 182.0 3678.1
A029-2008500
F-3 8 .7 0.0 0 .0
A029-2008900
F-4 2207.6 0.0 2199.6
A029-2009500
F-5 2558.4 0.0 2549 .5
A029-2013500
F-8 2365.0 0.0 2368.1
A029-2040300
F-9 2565.0 0.0 2580 .6
A029-2041000
i 'F-10 NO COORDINATE
A029-2058300
G-11 NO COORDINATE
A029-2065100
F-15 4661.3 868.5
A029-2065200
F-17 4137.8 431.5
A029-2098600
J-18 NO COORDINATE POINTS
A029-2212200
F - 46 3583.9 138.2
CLOSEST
DISTANCE
10.3 95.6
46.1 70.4
0.0 65.0
26.6 9.8
29.4 105.8
93.1 345.6
224.8 414.3
POINTS WITHIN SPECIFIED SEARCH WINDOW
POINTS WITHIN SPECIFIED SEARCH WINDOW
4884.2 632.3 602.1
4026.2 1030.9 200.3
WITHIN SPECIFIED SEARCH WINDOW
3608.1 345.3 52~'.3
Vertical
/PROPOSED~
TVD DEPART
Intersection
/NEARBY~
TVD DEPART
VERTICAL
DISTANCE
5503.4 1589.6 7207.3 1726.2 1697.5
4319.2 575.4 4000.8 1007.7 -324.8
5145.0 1282.6 9221.3 1661.8 4075.4
SUMMARY
The well
which comes closest to
A029-200~900 F-4
the proposed well is:
Closest approach !iz~ance = 9.8 feet
KICK OFF for hhis 3'.[n = 2800.0 feet
$45DUA247:[DRAN033]F40 CLOSAP SHORT.LIS;8
9--AUG-1991
--- ClOsest Approach Analysis
Date: 9-AUG-91 Time: 10:29:11
Search Radius= 200 COURSE LINE
For proposed well: F-40 [12-11-11-13]
Location = W-E S-N TVD(SBS)
Top 651959.00 5973793.00 -65.00
Bottom 649900.77 5969509.96 9131.00
Note: Ail depths in feet Below Kelly Bushing (BKB)
10:29
Page
Closest Approach
WELL IDENT /PROPOSED~ /NEARB¥~ CLOSEST
TVD DEPART TVD DEPART DISTANCE
A029-2008000
F-1 3805.8 233.1
A029-2008400
F-2 3644.5 161.8
A029-2008500
F-3 8.7 0.0
A029-2008900
F-4 2207.6 0.0
A029-2009500
F-5 2558.4 0.0
A029-2013500
F-8 2365.0 0.0
A029-2040300
F-9 2565.0 0.0
A029-2041000
F-10 NO COORDINATE POINTS
A029-2065100
F-15 4628 . 9 840 . 7
A029--2065200
F--17 4313 .1 570.3
A029-2098600
J-18 NO COORDINATE POINTS
A029-2171600
J-20 NO COORDINATE POINTS
A029-2212200
F - 46 3344.9 66.3
3797.6 10.4 125.0
3625.9 42.3 90.4
0.0 0.0 65.0
2199.6 26.6 9.8
2549.5 29.4 105.8
2368.1 93.1 345.6
2580.6 224.8 414.3
WITHIN SPECIFIED SEARCH WINDOW
4884.2 632.3 689.1
4195.7 1185.3 193.5
WITHIN SPECIFIED SEARCH WINDOW
WITHIN SPECIFIED SEARCH WINDOW
3365.1 322.1 539.6
SUMMARY
The well which comes closest to the proposed well is:
A029-200E~00 F-4
Closest approach !is~ance = 9.8 feet
KICK OFF for this ~un = 2800.0 feet
Vertical
/PROPOSED~
TVD DEPART
Intersection
/NEARBY~
TVD DEPART
5975.1 1993.6 8507.9 2182.4 2526.5
4427.4 668.1 4131.7 1127.3 -302.2
VERTICAL
DISTANCE
TO
pIT
V'~L I,/H E T.a~k/K
ID0 86L.
," HUD 'RI[YJTION D~TC
AIUD
~sc~t P/oAICE/~
TRIP TAIMK
D~'GA 5SER '1'AIq K
I'~0 88/.-
I/AC u LI ~I
T Y i=~
Choke Manifold
Poor Boy Degasser ·
Brand t Vacuum.-Type Degasser
Br~andt Dual Tandem Shale Shaker
Pioneer Mud Cleaners
Pfoneer MKI Centrifuge
1 - Recording drilling fluid, pit 'level indicator with both visual and audio warning
devices at driller's console '
1 - Trip Tank (75 BBL.)
1 - Drilling fluid flow sensor with readout at driller's console
11 - 5 Hp Agitators
MUD WEIGHT
WELL F-40
CALCULATIONS
(12-11-11-13)
Mud Wt. (6-3/4" Hole): 8.8 ppg.
P Sag River:
P Sadlerochit:
P Top Sadlerochit:
3700 psi.
3550 psi. at 8800' TVDSS
3523 psi.
OB Sag River:
OB Top Sadlerochit:
Current GOC:
200 psi.
432 psi.
8860' TVDSS (8925' TVDBKB)
7-5/8" Casing Pt.
Top Sag River
Top Sadlerochit
8519' TVDBKB
8527' TVDBKB
8643' TVDBKB
Cement Calculations
10-3/4" CASING
Measured Depth:
Basis:
Total Cement Vol:
Lead Slurry Vol:
Tail Slurry Vol:
7-5/8"CASING
Measured Depth:
Basis:
Total Cement Vol:
Lead Slurry Vol:
Tail Slurry Vol:
5-1/2" LINER
Measured Depth:
Basis:
Total Cement Vol:
2680'
2.5 X Annular volume
2440 (cu ft)
1382 (cuft) 712 Sx Arcticset III @ 1.94 Cu ft/Sk
1055 (cu ft) 1134 Sx Arcticset II @ 0.93 Cu ft/Sk
9990'
90% Annular Volume of 9-7/8" hole + 50 cu ft
1500 (cu ft)
1350 (cu ft) 754 Sx G+8% @ 1.79 Cu ft/Sk
150 (cu ft) 130 Sx Neat G @ 1.15 Cu ft/Sk
9740' (Hanger)- 10871' (Shoe)
1.5 X Annular volume to 7-5/8" shoe + 100 cu ft
210 (cu ft) 181 Sx Neat G @ 1.16 Cu ft/Sk
SS: 8-26-91
~ .... OLE DIVERTER SYSTEM-::.::"
SUF,.: ACE r-~
Twa lines venting 90 deg. apart in directions
that ensure safe down wind venting, and ex-
tending to a point at least 100' from any'
source of ignition.
..I0' Full Opening Valves
35' or ~s required
Dresser Sleeve
1. Ali pipe connections 150# ANSI
Flanges or welded connections
and secured lo prevent mavemenL
2. Manual 10" full opening valves
mechanically' connected to ensure
that one valve is fail-sate open at
ali times.
10' Diverter Uno
~]. All tums are go deg. and
targeted.
10' Full opening ball valve w/Hydraulic
Actu~ttar
Cellar
20' D[verter Spool w/10' Side Outlet
MEM 1/3/g0
ITEM
(1) Fee
(2) Loc
** CHECK LIST FOR NEW WELL PERMITS **
APPROVE DATE
[2 thru 8]
'[~9 ~rw_ 13]" '
[10 & 13]
1-14 thru 22]
(5) BOPE *~
[23 thru 28]
/'
(6) Other
C29 thr~ 3'i3'-
Company //~t? Lease & Well
(6) Add l ,~...4~'~
·
·
3.
4.
5.
6.
7.
8.
i
10.
11.
12.
13
14.
15.
16.
17.
18.
19.
20.
21.
22.
YES NO
Is permit fee attached ...............................................
Is well to be located in a defined pool .............................. ~_
Is well located proper distance from property line ...................
Is well located proper distance from other wells .....................
Is sufficient undedicated acreage avai.-lable in this pool .............
Is well to be deviated & is wellbore Plat included ...................
Is operator the only affected party ..................................
Can permit be approved before 15-day wait ............................
Does Operator have a bond in force ...................................
Is a conservation order needed .......................................
Is administrative approval needed ....................................
DoesIS leaSewell n~nberhave aappr°priateunique name ........................................~' n~nber
Is conductor string provided .........................................
Will surface casing protect all zones reasonably expected
to
Is
Wil
Wil
Will all casing give adequate safety in collapse, tension, and burst.
Is well to be kicked off from an existing wellbore ...................
Is old wellbore abandonment procedure included on 10-403 .............
Is adequate wellbore separation proposed .............................
serve as an underground source of drinking water .................. ~
enough cement used to circulate on conductor & surface ............ ~
1 cement tie in surface & intermediate or production strings ......
1 cement cover all known productive horizons ..................... ~
RF_~RKS
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
Is a diverter system required ........................................
Is drilling fluid program schematic & list of equipment adequate .....
Are necessary diagrams & descriptions of diverter & BOPE attached ....
Does BOPE have sufficient pressure rating -- test to ~~ psig .....
Does choke manifold comply w/API RP-53 (May 84) ......................
Is presence of H2S gas probable ......................................
FOR EXPLORATORY & STRATIGRAPHIC WELLS:
Are data presented on potential overpressure zones ...................
Are seismic analysis data presented on shallow gas zones .............
If offshore loc, are survey results of seabed conditions presented...
Additional requirements .............................................
geo 1 ogy'
DWJ~
RP~,~
eng i neer i n?.,.~ ''-~ .
MTM._~'~,' LCS .,"~"~'
BEW ,...,' ...... RAE) '~
JH ~-II ~
rev 03/29/91
jo/6.011
INITIAL GEO1 UNIT ON/OFF
POOL CLASS STATUS AREA ~ SHORE
Additional
remarks'
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX. ,
No special effort has been made to chronologically
organize this category of information.
Copyright 1987,1988,1989,1990,1991
By WESTERN ATLAS INTERNATIONAL, INC. Ail rights reserved.
Tape Subfile 1 is type: LIS
**** REEL HEADER ****
91/12/19
01
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
RUN1
96973
J. DAHL
T. LOVE
F-40
500292221500
BP EXPLORATION
ATLAS WIRELINE SERVICES
19-DEC-91
RUN2 RUN3
02
liN
13E
3005
2884
67.43
66.43
38.81
OPEN HOLE CASING DRILLER' S
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
dAN 0 8 i992
Alaska Oil & Gas Cons, Commission
Anchorage
1ST STRING
2ND STRING 7.625 10012.0
3RD STRING
PRODUCTION STRING 6.750
REMARKS: CIRCULATION STOPPED: 03:30 (12-NOV-91)
MAIN PASS IS THE LOGGING DOWN PASS, DEPTH MATCHED TO
THE LOGGING UP PASS DUE TO THE TOOL STICKING FROM
10660' - 10720'. ATEMPTED ANOTHER PASS OVER THIS
INTERVAL BUT STICKING BECAME WORSE. BOTH REPEAT PASSES
ARE LOGGING UP PASSES. SP DRIFTING EXCESSIVELY ON THE
LOGGING UP PASS.
CASED HOLE GR/CN RAN UNTIL 400' ABOVE HRZ ZONE.
$
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings; depth shifted and clipped curves;
hole data.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
all runs merged;
no case
DIL 10004.0 10870.0
BCS 10004 . 0 10877 . 0
2435 10004.0 10844.0
$
BASELINE CURVE
CURVE SHIFT DATA
FOR SHIFTS: BCS GR
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH AC CNC
10051.5 10054.0
10054.5 10057.0
10079.5 10080.0
10081.0 10081.5
10081.5 10082.5
10086.0 10087.0
10108.0 10108.5
10108.5 10109.0
10109.5 10109.5
10110.0 10111.5
10111.5 10113.0
10112.5 10113.5
10113.5 10114.0 10113.5
10114.5 10114.0
10116.5 10117.0
10117.5 10117.5 10117.0
10118.0 10118.0
10118.5 10117.5
10119.5 10118.5
10165.5 10165.0
10170.0 10169.5
10251.5 10250.5
10253.5 10252.5
10424.5 10425.5
10479.0 10479.5
10479.5 10480.0
10519.0 10520.5
10520.0 10521.5
10578.5 10577.5
10580.5 10579.5
10604.0 10603.5
10604.5 10604.5
10607.5 10607.5
10608.0 10608.5
1062
1062
1069
1069
1069
1070
1070
1070
1070
1070
1073
1074
1074
$
MERGED
0.5
1.0
2.0
3.0
3.5
5.5
6.0
7.0
8.0
8.5
8.5
0.5
2.0
DATA SOURCE
PBU TOOL CODE
BCS
DIL
2435
$
REMARKS:
CN
WN
FN
COUN
STAT
10
10
10
10
10
10
10
10
10
10
10
10
10
RUN NO.
1
3
: BP EXPLORATION
: F-40
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
618.5
619.0
689.5
690.5
691.5
706.0
707.0
708.0
708.5
709.0
738.5
740.5
742.0
PASS NO. MERGE TOP MERGE BASE
1 1.0 0.0
2 4.0 0.0
** 9908.0 0.0
ONE DEPTH PER FRAME
Tape depth ID: F
12 Curves:
Name Tool Code Samples Units
Size
API API API API
Log Crv Crv
Length Typ Typ Cls Mod
DT BCS 68 1 US/F
FUCT 2435 68 1 CPS
GR BCS 68 1 GAPI
ILD DIL 68 1 OHMM
ILM DIL 68 1 OHMM
LL8 DIL 68 1 OHMM
MTEM BCS 68 1 DEGF
NPHI 2435 68 1 PU-S
NUCT 2435 68 1 CPS
SP BCS 68 1 MV
TEND BCS 68 1 LB
TENS 68 1 LB
4 85 618 83 5
4 84 023 70 1
4 67 465 06 6
4 93 412 48 5
4 94 723 20 5
4 39 005 82 1
4 00 513 42 5
4 52 326 75 5
4 83 368 34 1
4 13 465 75 5
4 56 053 87 1
4 94 017 77 6
48
DATA RECORD (TYPE# 0 )
Total Data Records: 97
994 BYTES *
Tape File Start Depth = 10918.000000
Tape File End Depth = 10004.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 23778 datums
Tape Subfile: 2 227 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUMBER: 4
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
START DEPTH
7658.0
2435
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
REMARKS:
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: F-40
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
STOP DEPTH
10004.0
EQUIVALENT UNSHIFTED DEPTH --
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
FUCT 2435 68 1 CPS
GRCH BCS 68 1 GAPI
NPHI 2435 68 1 PU-S
NUCT 2435 68 1 CPS
TEND BCS 68 1 LB
TENS 68 1 LB
4 84 023 70 1
4 67 465 06 6
4 52 326 75 5
4 83 368 34 1
4 56 053 87 1
4 94 017 77 6
24
DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 131
Tape File Start Depth = 10004.000000
Tape File End Depth = 7658.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
32852 datums
Tape Subfile: 3
157 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 1 ~
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
DIFL
BHC
2435
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
9950.0
9943.0
9908.0
STOP DEPTH
10870.0
10877.0
10915.0
12-NOV-91
FSYS256 REV:G002 VER:2.0
330 12-NOV-91
950 12-NOV-91
10880.0
10871.0
9905.0
10915.0
0.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
MIS
TEMP
GR
CN
PCM
AC
DIFL
$
CABLEHEAD TENSION
MASS ISOLATION SUB
TEMPERATURE
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
ACOUSTIC LOG
DUAL IND FOCUSED LOG
TOOL NUMBER
3974
3967
2806
1309
2435
3506
1603
1503
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
6.750
10012.0
10004.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
LOW SOLIDS
8.80
37.0
9.0
8.0
174.0
4.740
68.0
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
REMARK S:
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: F-40
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
1.850
4.140
0.000
2.780
0.000
THERMAL
SANDSTONE
0.00
0.000
0.0
174.0
68.0
0.0
68.0
0.0
ONE DEPTH PER FRAME
Tape depth ID: F
12 Curves:
1
2
3
4
5
6
7
8
9
10
11
12
Name Tool Code Samples Units
AC AC 68 1 US/F
CHT 68 1 LB
CLSN 2418 68 1 CPS
CNC 2418 68 1 PU-S
CSSN 2418 68 1 CPS
GR GR 68 1 GAPI
RFOC DIFL 68 1 OHMM
RILD DIFL 68 1 OHMM
RILM DIFL 68 1 OHMS4
SP DIFL 68 1 MV
TEMP TEMP 68 1 DEGF
TTEN 68 1 LB
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4
4
4
4
4
4
4
4
4
4
4
4
4 48 852 89 1
4 94 017 77 6
4 27 466 87 5
4 86 720 65 6
4 28 122 23 5
4 21 990 60 6
4 27 515 24 6
4 04 903 06 0
4 06 213 78 0
4 53 419 67 0
4 06 033 97 0
4 94 017 77 6
48
* DATA RECORD (TYPE# 0)
Total Data Records: 213
994 BYTES *
Tape File Start Depth = 10915.000000
Tape File End Depth = 9905.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code' 68
76312 datums
Tape Subfile: 4
291 records...
Minimum record length:
Maximum record length:
62 bytes
994 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
9908.0
9905.0
9905.0
DIFL
BHC
2435
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
10915.0
10272.0
10272.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
MIS
TEMP
GR
CN
PCM
AC
DIFL
$
CABLEHEAD TENSION
MASS ISOLATION S
TEMPERATURE
GAMMA RAY
COMPENSATED NEUT
PULSE CODE MODULATOR
ACOUSTIC LOG
DUAL IND FOCUSED
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
12-NOV-91
FSYS256 REV:G002 VER:2.0
330 12-NOV-91
950 12-NOV-91
10880.0
10871.0
9905.0
10915.0
0.0
TOOL NUMBER
3974
2806
1309
3506
1603
6.750
10012.0
10004.0
LOW SOLIDS
8.80
37.0
9.0
8.0
174.0
4.740
1.850
4.140
68.0
174.0
68.0
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
REMARKS:
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: F-40
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
0.000
2.780
0.000
THERMAL
SANDSTONE
0.00
0.000
0.0
0.0
68.0
0.0
ONE DEPTH PER FRAME
Tape depth ID: F
12 Curves:
1
2
3
4
5
6
7
8
9
10
11
12
Name Tool Code Samples Units
AC AC 68 1 US/F
CHT 68 1 LB
CLSN 2418 68 1 CPS
CNC 2418 68 1 PU-S
CSSN 2418 68 1 CPS
GR GR 68 1 GAPI
RFOC DIFL 68 I OHMM
RILD DIFL 68 1 OHMM
RILM DIFL 68 1 OHMM
SP DIFL 68 1 MV
TEMP TEMP 68 1 DEGF
TTEN 68 1 LB
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 48 852 89 1
4 94 017 77 6
4 27 466 87 5
4 86 720 65 6
4 28 122 23 5
4 21 990 60 6
4 27 515 24 6
4 04 903 06 0
4 06 213 78 0
4 53 419 67 0
4 06 033 97 0
4 94 017 77 6
48
* DATA RECORD (TYPE# 0)
Total Data Records: 213
994 BYTES *
Tape File Start Depth = 10915.000000
Tape File End Depth = 9905.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
85386 datums
Tape Subfile: 5
289 records...
Minimum record length:
Maximum record length:
62 bytes
994 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
DIFL 9905.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
10272.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
MIS
TEMP
GR
CN
PCM
AC
DIFL
$
CABLEHEAD TENSION
MASS ISOLATION S
TEMPERATURE
GAMMA RAY
COMPENSATED NEUT
PULSE CODE MODULATOR
ACOUSTIC LOG
DUAL IND FOCUSED
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT)'
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
12-NOV-91
FSYS256 REV:G002 VER:2.0
330 12-NOV-91
950 12-NOV-91
10880.0
10871.0
9905.0
10272.0
0.0
TOOL NUMBER
3974
2806
1309
3506
1603
6.750
10012.0
10004.0
LOW SOLIDS
8.80
37.0
9.0
8.0
174.0
4.740
1.850
4.140
0.000
2.780
68.0
174.0
68.0
0.0
68.0
MUD CAKE AT BHT: 0.000 0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
0.00
0.000
TOOL STANDOFF (IN) :
0.0
REMARKS:
REPEAT PASS NUMBER 2 WITH DUAL INDUCTION ONLY.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: F-40
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
ONE DEPTH PER FRAME
Tape depth ID: F
4 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
RFOC DIFL 68 1 OHMM
RILD DIFL 68 1 OHMM
RILM DIFL 68 1 OHMM
SP DIFL 68 1 MV
4
4
4
4
4 27 515 24 6
4 04 903 06 0
4 06 213 78 0
4 53 419 67 0
16
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 81
Tape File Start Depth = 10915.000000
Tape File End Depth = 9905.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 96518 datums
Tape Subfile: 6 155 records...
Minimum record length: 62 bytes
Maximum record length: 1006 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CASED HOLE MAIN PASS
Curves and log header data for open hole logs run into casing.
PASS NUMBER: 4
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
2435
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
MIS
TEMP
GR
CN
PCM
AC
DIFL
$
7658.0 10115.0
CABLEHEAD TENSION
MASS ISOLATION SUB
TEMPERATURE
G~ RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
ACOUSTIC LOG
DUAL IND FOCUSED
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
12-NOV-91
FSYS256 REV:G002 VER:2.0
330 12-NOV-91
950 12-NOV-91
10880.0
10871.0
7658.0
10115.0
0.0
TOOL NUMBER
3974
3967
2806
1309
2435
3506
1603
1503
6.750
10012.0
10004.0
LOW SOLIDS
8.80
37.0
9.0
8.0
174.0
4.740
1.850
4.140
0.000
2.780
0.000
68.0
174.0
68.0
0.0
68.0
0.0
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS:
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: F - 40 (12-11-11-13)
:
:
:
THERMAL
SANDSTONE
0.00
0.000
0.0
ONE DEPTH PER FRAME
Tape depth ID: F
12 Curves:
1
2
3
4
5
6
7
8
9
10
11
12
Name Tool Code Samples Units
CSSN 2418 68 1 CPS
TTEN 68 1 LB
GR GR 68 1 GAPI
AC AC 68 1 US/F
RFOC DIFL 68 1 OHMM
RILD DIFL 68 1 OHMM
CHT 68 1 LB
RILM DIFL 68 1 OHMS4
SP DIFL 68 1 MV
CLSN 2418 68 1 CPS
CNC 2418 68 1 PU-S
TEMP TEMP 68 1 DEGF
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4
4
4
4
4
4
4
4
4
4
4
4
4 28 122 23 5
4 94 017 77 6
4 21 990 60 6
4 48 852 89 1
4 27 515 24 6
4 04 903 06 0
4 94 017 77 6
4 06 213 78 0
4 53 419 67 0
4 27 466 87 5
4 86 720 65 6
4 06 033 97 0
48
* DATA RECORD (TYPE# 0)
Total Data Records: 519
994 BYTES *
Tape File Start Depth = 10115.000000
Tape File End Depth = 7651.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 213528 datums
Tape Subfile: 7 590 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 8 is type: LIS
**** TAPE TRAILER ****
01
**** REEL TRAILER ****
91/12/19
01
Tape Subfile: 8 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Thu 19 DEC 91 11:53a
Elapsed execution time = 35.04 seconds.
SYSTEM RETURN CODE = 0