Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-126PBU M-24A
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage,
AK 99503
201-126
50-029-20939-01-00
341J
ADL 0028282
10886 8799
2644
8951
310
361
2263
9119
13-3/8"
9-5/8"
7"
5"
3-3/16" x 2-7/8"
8651
38 - 2682
36 - 8987
8710 - 9020
8659 - 9020
8623 - 10886
38 - 2682
36 - 8529
8283 - 8558
8238 - 8558
8207 - 8799
None9119, 10050
5380
6870
8160
9910
13450
9018 - 10719 5-1/2" 17# 13Cr80 33 - 86648556 - 8729
80 20" x 30" 39 - 119 39 - 119
5-1/2" TIW HBBP Packer
No SSSV Installed
8609, 8195
Torin Roschinger
Operations Manager
Hunter Gates
hunter.gates@hilcorp.com
(907) 777-8326
PRUDHOE BAY
7/16/2025
PRUDHOE OIL PRUDHOE OIL
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2025.07.03 05:27:16 -
08'00'
Torin Roschinger
(4662)
Mill CIBPs
325-401
By Grace Christianson at 8:19 am, Jul 03, 2025
JJL 7/7/25
Perforating gun BHA not to exceed 500'.
Reestablish pressure containment prior to perforating.
Perform and document well control drill on each shift using attached standing orders.
Ensure well is dead before breaking containment
A.Dewhurst 14JUL25 DSR-7/3/25
10-404
*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2025.07.14 13:04:57
-08'00'07/14/25
RBDMS JSB 071425
Mill Plugs & Extended Add Perf
Well: M-24A
Well Name:M-24A API Number:50-029-20939-01
Current Status:Operable Pad:M-Pad
Reg. Approval Req’d?Yes Estimated Start Date:7/16/25
Regulatory Contact:Abbie Barker Job Type:Mill Plug/Ext adperf
First Call Engineer:Hunter Gates Mobile Phone:(215) 498-7274
Second Call Engineer:Tyson Shriver Mobile Phone:(406) 690-6385
Current Bottom Hole Pressure:3,017 psi @ 8,500’ TVDss – SBHPS on 4/7/2024
Min ID:2.377” @ 9,106’ MD XO
Max Angle:97 Deg @ 9,573’
Tie In Log:2014 Coil Flag is the best quality but only goes to 10,193’ (see folder)
Background:
M-24A was a CTD sidetrack that was drilled in August 2001. There are currently 2 CIBP’s, one set in April 2014
at 10,050’ to shut-in Z4B toe perfs and another set in August 2018 at 9,119’ to perf and test Sag only. We are
now looking to mill out these plugs and shoot 350’ of extended perforations targeting Z4B sands.
Objective:Mill two CIBPs (9,119’ & 10,050’) to open up perforations. Extended Perforate 350’ net guns on 450’
gross interval.
Coiled Tubing - Mill Plugs
1. MIRU and MU milling BHA (likely a venturi burnshoe) at WSS discretion, attempt to recover the core of
the first 2-7/8” CIBP (9,119’).
2. Circulate hole clean. POOH and inspect BHA noting if core was recovered.
3. MU & RIH w/ motor and mill (at WSS discretion) and begin milling second CIBP (10,050’). Chase
CIBP/plug debris to below bottom perf at 10,719’ (PBTD at 10,733’). Note final tag depth.
4. Circulate hole clean until we obtain clean returns.
5. POOH and LD milling BHA.
6. Prepare for extended perforating operations.
7. MU GR/CCL and nozzle. RIH to tag depth on milled CIBP’s and pull log to ~9,000’MD. Paint coil flag for
subsequent perf run.
8. POOH and correlate for perf run.
Coiled Tubing - Extended Perforating
Notes:
Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations
Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS
coverage is required.
The well will be killed and monitored before making up the initial perf guns. This is generally done during the
drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating
bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by
bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head.
1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through
the brass upon POOH with guns.
Mill Plugs & Extended Add Perf
Well: M-24A
2. Bullhead 1.2x wellbore volume ~260 bbls 1% KCL/SW down tubing. Max tubing pressure 2500 psi.
(This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the
well kill is at the discretion of the WSS.)
a. Wellbore volume to top perf = 217 bbls
b. 5-1/2” tubing/liner – 8,623’ X 0.0232 bpf = 200 bbls
c. 3-1/2” liner - 8,623 – 8,632’ X .0087 bpf= 1 bbls
d. 3-3/16” liner – 8,632’ – 10,733’ (PBTD)’ X .0075 bpf = 16 bbls
3. At surface, prepare for deployment of TCP guns.
4. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg
as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids
man-watch must be performed while deploying perf guns to ensure the well remains killed and there is
no excess flow.
5.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review standing
orders with crew prior to breaking lubricator connection and commencing makeup of TCP gun string.
Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily
accessible near the working platform for quick deployment if necessary.
a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns
one time to confirm the threads are compatible.
6.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly
monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed
while deploying perf guns to ensure the well remains killed and there is no excess flow.
Perf Schedule
Use 2” Maxforce guns or similar
Perf Interval (tie-in depths) Lengths
Total Gun
Length
Weight of Gun (lbs)
Run #1 10,050’ - 10,250’
100’ blank
10,350’ - 10,500’
10,050’ – 10,500’ 450’ ~2520 lbs (5.6 ppf)
7. Make up QTS and PT same.
8. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule
above.
a. Note any tubing pressure change in WSR.
9. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and
stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface.
10. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary.
11. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and
commencing breakdown of TCP gun string.
12. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA.
13. RDMO CTU.
14. Turn well over to Operations POP.
Contingent Slickline – Set Dreamcatcher
1. If unable to get plug past perf interval, set Dreamcatcher in X-nipple @ 8,595’. If we are able to chase
the plug past bottom perf,do not set a Dreamcatcher.
Mill Plugs & Extended Add Perf
Well: M-24A
2. Pull dream catcher after a minimum of one week
Contingent Testers
1. MIRU portable test separator.
2. Communicate with PCC to optimize GL rates starting at 2 MMCFD with a max of 4.5 MMCFD.
3. Take frequent samples ensuring that we are not seeing any solids in returns.
4. Work well to FOC (choke bypass) quickly if no solids are seen in returns at surface. Communicate with
OE to determine frequency based on well condition.
5. Once open and comfortable with clean returns, RDMO test unit.
Attachments:
Wellbore Schematic
Proposed Schematic
Tie-In Log,
BOPE Diagram
Standing Orders
Equipment Layout
Sundry Change Form
Mill Plugs & Extended Add Perf
Well: M-24A
Mill Plugs & Extended Add Perf
Well: M-24A
New Perforations
10,050’-10,250’
10,350’-10,500’
Milled CIBP’s
chased to bottom
Mill Plugs & Extended Add Perf
Well: M-24A
See Log in Folder
Mill Plugs & Extended Add Perf
Well: M-24A
BOP Schematic
Mill Plugs & Extended Add Perf
Well: M-24A
Mill Plugs & Extended Add Perf
Well: M-24A
Mill Plugs & Extended Add Perf
Well: M-24A
Changes to Approved Sundry Procedure
Date:
Subject:
Sundry #:
Any modifications to an approved sundry will be documented and approved below. Changes to an
approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written
approval of the change is required before implementing the change.
Step Page Date Procedure Change
HNS Prepared
By (Initials)
HNS Approved
By (Initials)
AOGCC Written
Approval
Received
(Person and
Date)
Approval:
Operations Manager Date
Prepared:
Operations Engineer Date
STATE OF ALASKA
AL ,CA OIL AND GAS CONSERVATION COMM__ ON
REPORT OF SUNDRY WELL OPERATIONS
F5-722/(LI-
1.Operations Abandon Li Repair Well U Plug Perforations 41 Perforate Li Other LJ Set CIBP
Performed: Alter Casing ❑ Pull Tubing Stimulate-Frac ❑ Waiver ❑ Time Extension❑
Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑
2.Operator 4.Well Class Before Work: 5.Permit to Drill Number:
Name: BP Exploration(Alaska),Inc
Development Exploratory ❑ 201-126-0
3.Address: P.O.Box 196612 Strati ra hi Service 6.API Number:
9 P <❑ ❑
Anchorage,AK 99519-6612 -• 50-029-20939-01-00
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL0028282 • PBU M-24A
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):
)
PRUDHOE BAY,PRUDHOE OIL
11.Present Well Condition Summary:
Total Depth measured + 10886 feet Plugs measured 10050 feet 4, j` .
true vertical 8799.07 feet Junk measured None feet
Effective Depth measured • 10050 feet Packer measured 8609 feet
true vertical 8716.99 feet true vertical 8194.6 feet
Casing Length Size MD TVD Burst Collapse
Structural None None None None None None
Conductor 80 20"91.5#H-40 35-115 35-115 1490 470
Surface 2648 13-3/8"72#L-80 34-2682 34-2682 4930 2670
Intermediate None None None None None None
Production 8954 9-5/8"47#L-80 33-8987 33-8528.94 6870 4760
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation depth Measured depth See Attachment feet
True Vertical depth See Attachment feet
I SCANNED JUN 1 1 2014
Tubing(size,grade,measured and true vertical depth) 5-1/2"17#NT-13Cr80 33-8664 33-8242.55
Packers and SSSV(type,measured and true vertical depth) 5-1/2"TIW HBBP Packer 8609 8194.6 Packer
None None None SSSV
12.Stimulation or cement squeeze summary:
Intervals treated(measured): RBDMS4k.MAY 16 2014
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 79 422 2012 2002 206
Subsequent to operation: 0 0 0 0 0
14.Attachments: 15.Well Class after work:
Copies of Logs and Surveys Run Exploratory❑ Development 0 • Service❑ Stratigraphic ❑
Daily Report of Well Operations X 16.Well Status after work: Oil • Q Gas U WDSPLI
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCJ
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Contact Nita Summerhays Email Nita.Summerhaysbp.com
Printed Name Nita Su�erha s., Title Data Coordinator
%s///
_S,ign- s��_ �� !�►% Phone 564-4035 Date 4/24/2014
17Z /77 /I
ifri,
/
Form 10-404 Revised 10/2012 Submit Original Only
•
Daily Report of Well Operations
ADL0028282
ACTIVETYDATE I SUMMARY
• w . . cope; e
Rig up. BOP function tested upon installation. RIH w/WFD mha/PDS gr/ccl DJN 2.25",
OAL 12.854'.
4/1/2014 **Continued on WSR 4/212014**
CTU 9 w/ 1.75" CT. Scope; Set CIBP
**Continued from WSR 4/1/2014**
RIH w/DJN 2.25"to 10200' log PDS gr/ccl to 9000' and flag pipe 9931'. Good data with -
7' correction. RIH w/BHA; 1.9"ctc,1.68" dfcv,crossover,circ sub, setting tool, 2.22"
setting adapter, 2.22"Weatherford CIBP. (oal= 11.54'). (Phoned APE; got ok to set plug
at 10050', 20 deeper than program requested ).Set CIBP at 10050'. Slack 2.5k DW on
plug, pickup clean. Pooh. Recovered ball.
FP well with 58 bbls of 60/40 meth. **job complete**
4/2/2014
FLUIDS PUMPED
BBLS
72 METH
354 1% SLICK KCL W/SAFELUBE
116.60/40 METH
542 TOTAL
d
N
IC
Ln � M N- j O ti N Co r M M 00 Co
t CO O Co CV 0) O V' N M O 0) O c-- C0 Cn
00 O O O O COLU
y 0) O v U) C+') N N N v- v- O v- v- v- v- N
O C0 N- N- Co N- N- N- N- N- N- ti N- N- N- N- N- N- O>
p CO Co CO Co Co CO CO Co Co CO Co CO Co CO CO CO
H LU
o
ww W Z
p p O W p
HH j0- W
o Y U O O
0
O O w Y Y g
- M N- N N N Cn — CO N (0 r 0) CO N 92 J U U w W
L Cfl (0 O CC) - d' O N N t0 N M Co O N V N J J J d U) Z
O 0) O C0 Cn '? N N N ' �- •- O '
O C0 N- N- N- N- N- N- N- N- N- N- N- N- N- N- N- Z Z Z O p p J p J
O Co CO Co Co Co CO Co CO Co CO Co CO Co CO Co CO Q Q Q = p p 0 Q
I- U U U w a Z O Z
W W W d H H Q J ¢
O U) v) Cl) (I) Cl)
m
N
N
m
L L L LU CO O O 0) Co O Co O CO CO 0)
++ a (0 CO O 0) O M C) C0 N ` N C0 .- N O
= 0) '- N CO N- O) 0) 0) 0 0 0 0 0 0 0 0
O 0) 0) 0) 0) 0) 0) 0) 0) 0) _ �-
E H
fC
a)
L �_ U) = 0 0
Q � a
N O
H
C t O Cn Ln N N- O O N- N O N U) N N— N C0 O
QLZ O Co Co CA CO N 0) 0) - N V V V V LUG a1 - r M CO In Co O O
a p � 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
a d
o
t
a)
a y
V
O
U
C
• u LL u LLL u C LL a. U) U) (I) U) U) Cl) U) Cl)
� aaamaW WCLCCLaaaa_ aQ CL
dQQQQQ � mQ ¢ mmmmmmmm
Q
0
t
0)
a p
W
J
p W 0
p p p O ¢
c• N N N N O O N 0 0 0 0 0 0 0 0 Z W J J Z W
WLU
Ct) C!) M N N N N N N N N N N a a W N N W
R V V N N N N N N N N 0 a C7 U W W U W
Q O p p J J p c [1
O m o J J 0 O W W
a)
E
m
Z Q Q Q Q Q Q Q Q Q Q Q Z Z Q Q Q Q
N N N N N N N N N N N N N N N N N I d 0) 0 ti N W
a)
0.D ) a) O o) 0 0 0
Ca I-- in N co (,:c_) O
O O N
O V O ON
U
0 0 0
" O o 0 0
(no , CO r co
m• O CO CS)
O co co co V f�
co O) — M LC)
O \ N- CO O O N LO
d7 CO CO CO CO N
N- CO CO N a7 N CO V
N CO LO t` LO N N
O CO O O CO CO CO
F-
M CO (3) LO O
CO (O N-
u) O .4 O N O M tet'
O N- CO CO CO M M M
• N N N CO
CO CO CO CO CO
C
O N M N 10
CO O CO CO O CO CO CO
CO O CO 0 0) CO CO
co.0
O) O) O) co N CO
C.)
CO NCi
Co
N CO N O) O N-
CO LO N CO LO x- O CO V CO
Q) (V co (.0 O CD co co co
= 0 OOOOC)
▪ c
� J
Q
I—▪ Qo0 o O °O
aoC C) CDoO
J O CO M
J J
_ N U 4# IL
rn _ Z Izt (O - �t
N CO N CO M
i M ; O)
CO Er) N
Ln
L
+' CO 0) O
0)O LO NCNJ N LO V co
C co O) ti (` f— O) CO co
(1) M O N O
J
z
0
W
y > > vU
U 0 CC CC CC CC CI Z
Z W W W W W O
O Z Z Z Z Z j D
U J J J J J d. (n
THEE= 6"CIV1/
NN�L-EAD= totEVOYM - SAFI Y NOTE 5-1/2"CHROME TBG APD 5"CHROME
----_._-_._- 4 A LMR WELL>70°@ 9280'.
ACTUATOR= BAKER
OKE.B_EV= 62_T
BF.B_EV= 27.32'
KOP=—� 4450' ® 2005' ---I5-1/2"CA MCO SSSV LAND NP,D=4.562"
Max Angle= 97°@ 9573'
Datum AM= 10811'
Datum TVD= 8700'SS 9-5/8"DV COLLAR H 2599' 1---= = [
GAS LFT WWNDRELS
13-3/8"CSG,72#,L-80,ID=12.347" H 2682' -A ST MD TVD DEV TYPE VLV LATCH PORT DATE
5 3051 3051 1 OTIS DOW RA 16 11/14/12
4 5698 5602 27 OTIS DMY RA 0 08/11/01
' I 3 6595 6408 26 OTIS DOW RA 16 08/11/01
I"II 2 8299 7924 30 OTIS 0MY RA 0 08/11/01
Minimum ID =2.372" @ 9106' 1 8564 8155 29 OTIS S/O RA 24 08/11/01
3-3116" X 2-7/8" XO
I 8595' —15-1/2"OTIS X NP,D=4.562"
M Xe 8609' H9-518'x 5-1/2"TIW HBBP PKR,D=4.75"
6 r 8623' —4.13"BKR DEPLOY SLV,D=3.00"
8629' —3-1/2"FL4S PN,D=2.88
8637 I—3-1/2"X 3-3/16"XO,ID=2.786"
8635' —{5-1t2"OTIS X NP,D=4.562"
TM/TIEBACK SLV,D=5.768" H 8659'
5-1/2'TBG,17#,NTI3CR-80, H i 8664' r 8648' —1 112"OTIS XN fes,D=4.455"
.0232 bpf,D=4.892"
8664' —5-1/2"DUMMY SEAL ASSY W/MULESHOE
9-5/8"X 5-1/2"TNV LNR HGR D=? H 8671'
0 5'1/2"X 5"XO,D=? — 8675' 7' HELM)TT LOGGED 06/18/91
9-5/8"X 7"BOT LNR HGR,ID=? —{ 8710' H
9-5/8'CSG,474,L-80,D=8.681" H 8987'
MLLOUT WINDOW(M-24A) 9020'-9031'
WHIP STOCK —I 9020'
RA TAG -1 9030' r 9106' —13-3/16"X 2-7/8" XO,D=2-377"
11111
11111
11111
PERFORATION SUM/ARV 1111111111 \it % 10050' —I WFD CEP(04/02/14)
f LOG:SWS MEMORY CM./GR 08/04/01 11111
11111
11111
PBTD 10733'
ANGLE AT TOP PERF: 30°@ 8140' 1111111111 ��
Note:Refer to Roduction DB for historical pert data 1111111111 ♦
SIZE SPF INTERVAL Opn/Sqz DATE 11111
SEE PAGE 2
FOR PERF 11111111111111111 a\\•
BREAKDOWN
3-3/16"LNR,6.2#,L-80 TCI, — 9106'
5'LNR,18#,13CR-80,.0177 bpf,D=4.276" -1 9667' .0076 bpf,D=2.80"
7"LNR,29#,13CR-80,0.0371 bpf,D=6.184" —I 9833' 2-7/8"LNR,6.16#,L-80,STL, ---I 10886'
.0058 bpf,D=2.44"
CATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
05/27/83 AUDI 2 ORIGINAL COMPLETION 08/15/11 JC/PJC TREE CIO(8/7/11) WELL. M-24A
06/14/91 MIS RG WORKOVER 08/15/11 MBM PJC RLL PX RUG(8/9/11) PERk4T No:"2011260
08/04/01 NORDIC I CTD SIDETRACK(M-24A) 11/19/12 BSE/JWO'GLV 00(11/14/12) API No: 50-029-20939-01
04/13/03 JCP/KK ADPBRFS 04/09/14 FIvtVJMD SET CBP(04/02/14) SEC 6,711N,R13E,2269'SNL&195'EWL
10/16/07 GJF/PJC PERFORATIONS
10/22/07 ?/PJC DRAWNG CORRECTIONS BP Exploration(Alaska)
r
M-24A
PERFS
I-1
1 1
S S
PERFORATION SIM4 R'
REF LOG:SWS MEMORY CNJGR ON 08/04/01
&MEM GR/OCL/CNL ON 04/14/02
ANGLE AT TOP FEF F: 30'@ 9140'
Note:Refer to Ftoduction DB for historical perf data
SIZE SR I'EIB?/AL Opn/Sqz SHOT SO7 0 0
2" 6 9140-9205 0 10/15/07
2" 4 9382-9384 0 04/13/03
7 4 9397-9403 0 04/13/03
7 4 9580-9730 0 08/04/01
2" 4 9820-9900 0 08/04/01 1 '
2" 4 9957-9969 0 04/13/03
2" 4 9972-9978 0 04/13/03
2" 4 10107-10119 C 04/13/03
2" 4 10122- 10128 C 04/13/03
2" 4 10250-10350 C 08/04/01 •
2" 4 10402- 10414 C 04/13/03 �•�•�•�•�•1
14 4.4
2" 4 10417- 10423 C 04/13/03 04 1.1
MO
2" 4 10452-10464 C 04/13/03 4 4.4 4 1 Nip
2" 4 10467- 10473 C 04/13/03 •�•�•�•�•�1
2" 4 10500-10719 C 08/04/01 4
••.4II
•&&•.0
AvA A A-/,.1t.�.$A
DATE REV BY COARvEJTS DATE REV BY COMMENTS N(TS PRUDHOE BAY UNIT
05/27/83 AIM 2 ORIGINAL COMPLETION 08/15/11 JC/PJC TREE CIO(8/7/11) WELL: M-24A
06/14/91 N3S RIG YVORKOVER 08/15/11 MBP/1 PJC PULL PX PLUG(8/9/11) PERMIT No:"2011260
08/04/01 NORDIC 1 CTD SIDETRACK(M-24A) 11/19/12 BSE/JMD GLV C/O(11/14/12) API No: 50-029-20939-01
04/13/03 JCP/KK ADPERFS 04/09/14 RM-Y34)SET CEP(04/02/14) SEC 6,T11 N,R13E,2269'SNL 8 195'EVVL
10/16/07 GJF/PJC PERFORATIONS
10/22/07 7/PJC CRAVNNG CORRECTIONS BP Exploration(Alaska)
• .
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
May 18, 2012
54 -.MED A UG 2 j X 012
Mr. Jim Regg a_01-10
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue `--4/4---
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPB M -Pad
Dear Mr. Regg,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad
M that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
M -pad
Date: 04/14/2012
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # cement pumped cement date inhibitor sealant date
ft bbls ft na gal
M -01 1690780 50029200420000 Sealed NA NA NA NA NA
M -03A 2011470 50029201020100 0.25 NA 0.25 NA 0.85 6/3/2009
M -04 1710230 50029201050000 0 NA 0 NA NA 4/14/2012
M -05A 1970810 50029201940100 0.5 NA 0.5 NA 2.6 6/3/2009
M -06A 1930930 50029203670100 0.25 NA 0.25 NA 0.85 6/3/2009
M -07 1790370 50029203730000 0.25 NA 0.25 NA 0.85 6/3/2009
M -08 1800860 50029204990000 1.75 NA 1.75 NA 10.2 6/24/2009
M -09B 2022200 50029205630200 6.25 NA 6.25 NA 44.2 6/3/2009
M -10 1810290 50029205670000 0.25 NA 0.25 NA 2.6 6/4/2009
M -11 1810570 50029205890000 0.25 NA 0.25 NA 1.7 6/4/2009
M -12A 2001510 50029205930100 0.25 NA 0.25 NA 1.7 6/4/2009
M -13A 2011650 50029205220100 2.75 NA 2.75 NA 17 6/4/2009
M -14 1801090 50029205120000 1 NA 1 NA 5.1 6/4/2009
M -15 1810850 50029206120000 6.75 NA 6.75 NA 55.3 6/4/2009
M - 16 1810860 50029206130000 0.25 NA 0.25 NA 1.7 6/4/2009
M -17A 2000320 50029206280100 0.5 NA 0.5 NA 2.6 6/3/2009
M -188 1930540 50029208550200 10 NA 10 NA 73.1 6/24/2009
M -19B 2081980 50029208970200 Sealed NA NA NA NA 4/13/2012
M - 20A 1971990 50029209120100 8 NA 8 NA 52.7 6/24/2009
M -21A 1930750 50029209230100 0.5 NA 0.5 NA 3.4 6/24/2009
M -22 1830540 50029209360000 16 NA 16 NA 117.3 6/23/2009
M -23 1830550_ 50029209370000 0.25 NA 0.25 NA 1.7 6/4/2009
----> M - 24A 2011260 50029209390100 0.25 NA 0.25 NA 0.85 6/24/2009
M - 25 1860650 50029215700000 8 NA 8 NA 55.3 6/3/2009
M - 26A 1920280 50029220040100 2.75 NA 2.75 NA 18.7 6/3/2009
M - 27A 1930860 50029219920100 0.25 NA 0.25 NA 2.6 6/24/2009
M -28 1860740 50029215780000 1 NA 1 NA 4.3 6/3/2009
M -29A 2000990 50029219040100 1 NA 1 NA 4.3 6/3/2009
M -30 1920300 50029222550000 0.5 NA 0.5 NA 3.4 6/3/2009
M -31 1920320 50029222560000 0.5 NA 0.5 NA 3.4 6/4/2009
M -32 1920330 50029222570000 0.25 NA 0.25 NA 0.85 6/4/2009
M -33 1941160 50029225040000 20 NA 20 NA 133.45 6/24/2009
M -34 1941330 50029225140000 6.25 NA 6.25 NA 25.5 6/3/2009
M -38A 2011320 50029225190100 21.3 NA 21.3 NA 210.8 11/26/2009
1. Operations Abandon D Repair Well D
Performed: Alter Casing D Pull Tubing D
Change Approved Program D Ope rat. Shutdown D
2. Operator BP Exploration (Alaska), Inc.
Name:
. ~~
STATE OF ALASKA _ /,I)-.A.f-
ALASKA Oil AND GAS CONSERVATION COM~ION
REPORT OF SUNDRY WELL OPERATIONS 1I18$/rlJOi
D Stimulate D Other D 8S ~
D Waiver D Time Extension D 4lJChor. 9173. COtr¡. .
o Re-enter Suspended Well D age 'lhISSi'l}
5. Permit to Drill Number:
201-1260 -
~~CI2II/I2D
22
P.O. Box 196612
Anchorage, AK 99519-6612
7. KB Elevation (ft):
Plug Perforations
Perforate New Pool
Perforate
4. Current Well Class:
Development
Stratigraphic
3. Address:
Exploratory
Service
6. API Number:
50-029-20939-01-00 r
9. Well Name and Number:
62.7 KB
PBU M-24A -
ADLO-028282 -
11. Present Well Condition Summary:
10. Field/Pool(s):
PRUDHOE BAY Field/ PRUDHOE OIL Pool
8. Property Designation:
Total Depth measured 10886 , feet Plugs (measured) None
true vertical 8799 - feet Junk (measured) None
Effective Depth measured 10733 feet
true vertical 8733 feet
Casing Length Size MD TVD Burst Collapse
Conductor 80 20" 91.5# H-40 Surface - 115' Surface - 115' 1490 470
Surface 2647' 13-3/8" 72# L-80 Surface 2682' Surface - 2682' 5380 2670
Intermediate 8952' 9-5/8" 47# L-80 Surface - 8952' Surface - 8498' 6870 4760
Liner 310' 7" 29# NT-13-CR-80 8710' 9833' 8283' - 8729' 8160 7020
Sidetrack Liner 2263' 2-7/8" 6.16# L-80 8623' - 10886' 8207' - 8799' 13450 13890
Perforation depth: Measured depth: SEE ATTACHMENT- - - - -
- - - -
True Vertical depth: ...:..
-
Packers and SSSV (type and measured depth)
5-1/2" 17#
o
9-5/8"X4-1/2" TIW HBBP
o
o
o
NT-13Cr80
o
33 - 8659'
Tubing: (size, grade, and measured depth)
8609'
o
o
o
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
~CMNED NOV () 1 Z007
Treatment descriptions including volumes used and final pressure:
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run
Daily Report of Well Operations
Oil-Bbl
224
SHUT-IN
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
712 3325
Tubing pressure
208
13.
x
15. Well Class after proposed work:
Exploratory Development
16. Well Status after proposed work:
Oil Gas WAG
Service
Contact Gary Preble
W INJ WDSPl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
N/A
Title Data Management Engineer
Signature
Phone 564-4944
Date 10/19/2007
Form 10-404 Revised 04/2006
ORIGINAL
OCT 2 6 200
Submit Original Only
.
M-24A
201-126
Perforations Attachment
Perforation Depth MD (ft)
9140' - 9165'
9165' - 9185'
9185' - 9205'
9382' - 9394'
9397' - 9403'
9508' - 9730'
9820' - 9900'
9957' - 9969'
9972' - 9978'
10107' -10119'
10122' - 10128'
1 0250' - 10350'
10402' - 10414'
10417' - 10423'
1 0452' - 1 0464'
10467' - 10473'
10500' - 10719'
Opn/Sqz
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
.
Perforation Depth TVD (ft)
8670' - 8691'
8691' - 8706'
8706' - 8720'
8759' - 8758'
8758' - 8758'
8754' - 8733'
8729' - 8726'
8723' - 8722'
8722' - 8722'
8715' - 8714'
8714' - 8714'
8710' - 8709'
8709' - 8710'
8710' - 8710'
8710' - 8710'
8710' - 8711'
8711' - 8729'
.
~
.
.
M-24A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
10/12/2007 ***WELL SHUT IN ON ARRIVAL***
INITIAL T/ 1/ 0 = 1600/1950/590 PSI
RU TO PERFORATE 2-7/8" TUBING FROM 9140' TO 9205' USING 2" HSD
2006 PJ HMX GUN, 6 SPF, 60 DEG PHASING.
***JOB INCOMPLETE. CONTINUED ON 13-0CT-2007 AWGRS.***
10/12/2007 *** 10/11/07
DRIFT W/ 21' OF 2" OD DUMMY GUN, SAMPLE BAILER TO 9260' SLM, NO
RESTRICTIONS, BAILER EMPTY
*** WELL LEFT S/I ON DEPARTURE ***
10/1
10/1
10/1
=
FLUIDS PUMPED
BBLS I
1 DIESEL
1 TOTAL
Well Job# Loa DescriDtion Date BL Color CD
1-21/K-25 11226008 LDL 10/02/06 1
B-27A 11414394 LDL 09/30/06 1
M-24A 11216213 MEM PROD PROFILE 09/30/06 1
MPB-09 11212889 PROD PROF/GLS 10/06/06 1
X-08A 11414278 USIT 09/26/06 1
C-01A 11414279 USIT 09/27/06 1
K-11 11414765 USIT 10/01/06 1
A-17A 11414283 USIT 10/02/06 1
Scblumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
&0 I - I 20
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc,
Petrotechnical Data Center LR2-1 ~_; f'
900 E. Benson Blvd ~r~ßo'~'Nf;Ç ,- 'L
Anchorage, Alaska 99508 '8f;j.Nì'(, ....-
Date Delivered:
10/19/06
NO. 4001
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave. Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
.
.
Received
Alaska Dala & Consulting
2525 Gambell Street, S : -
Anchorage, AK 99503-
ATTN: Beth
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _lnserts\Microfilm _ Marlœr.doc
Permitto Drill 2011260
DATA SUBMITTAL COMPLIANCE REPORT
7~30~2O03
Well Name/No. PRUDHOE BAY UNIT M-24A Operator BP EXPLORATION (ALASKA) INC
APl No. 50-029-20939-01-00
MD 10886 -~'~' TVD 8799 ~- Completion Dat 8/4/2001 --' Completion Statu 1-OIL Current Status 1-OIL UIC N
REQUIRED INFORMATION
Mud Log No Sample N._~o Directional Survey N.__~o
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Fmt
F--cJ~'" C Ne Neutron
(data taken from Logs Portion of Master Well Data Maint)
Interval
Log Log Run OH I Dataset
Name Scale Media No Start Stop CH Received Number Comments
1 8984 10708 Case 6/11/2002 .48892
E'~f Ne Neutron
E GR Gamma Ray
~r CC Casing collar Iocator
~ D
,.ED' D Ver LIS Verification
R_~pt Ver LIS Verification
ED C Cn See Notes
25 BS 1 8984 10708 Case 6/11/2002
25 BS 1 8984 10708 Case 6/11/2002
25 BS 1 8984 10708 Case 6/11/2002
FINAL OH 9/7/2001
Directional Survey
Directional Survey
10377
Compensated Neutrom 2
FINAL OH 9/7/2001
FINAL 8180 10729 CH 10/16/2001 ~re377
FINAL 8180 10729 CH 10/16/2001
1 9001 10836 Open 8/23/2002 ~-11~980
1 9001 10836 Open 8/23/2002
1 9003 10886 Case 1/21/2003 --11492
Directional Survey DIGITAL
DATA
Directional Survey
8180-10729 Digital Data
8180-10729 BL, Sepia
digital well logging data
Well Cores/Samples Information:
Name
Start
Interval
Stop
Dataset
Sent Received Number Comments
ADDITIONAL INFORMATION
Well Cored? Y / ~t
Chips Received? ~
Analysis ~
Rer.~.iv~.d?
Daily History Received? (~ N
Formation Tops Y~I
Comments:
Permit to Drill 2011260
MD 10886 TVD
DATA SUBMITTAL COMPLIANCE REPORT
7~30~2003
Well Name/No. PRUDHOE BAY UNIT M-24A
Operator BP EXPLORATION (ALASKA) INC
8799 Completion Dat 8/4/2001
Completion Statu 1-OIL
APl No. 50-029-20939-01-00
Current Status 1-OIL UIC N
Compliance Reviewed By: ...........
WELL LOG
TFIANSM/TTAL
II.
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. 7~Street
Suite # 700
Anchorage, Alaska 99501
RE · Distribution - Final Print(s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of'
Joey Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 13S9
Stafford, TX 77497
BP Exploration {Alaska}, Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 99508
Lo6 DIGITAL MYLAR / BLUE LINE REPORT
WELL DATE TYPE OR SEPIA PRINT[S) OR
CD-ROM FILM COLOR
Open Hole 1 I 1
Res. Eval. CH I ~ I 1
M-24A 4-12-03 Mech. CH 1
Caliper Survey
Signed'
Print Name:
Date ·
.
~'1~. ,~ ,,~,'~ :~¢ '..t:b~'~, ':',!
ProActive Diagnostic Services, Inc., 3 IO K STREET SUiTe 2~, Ancho~qe, AK 99501
Phone:(907) 245-8951 Fax:(907) 245-8952
E-mail: pdsanchorage@memorylog.com
Wcbsit¢: www.memorylog.com,
WELL LOG
TRANSM/TTAL
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. 7~Street
Suite # 700
Anchorage, Alaska 99501
RE: Distribution - Final Print(s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of:
Joey Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 13S9
Stafford, TX 77497
BP Exploration (Alaska), Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Bird.
Anchorage, AK 99508
LOG DIGITAL MYLAR / BLUE LINE REPORT
WELL DATE TYPE OR SEPIA PRINT(S) OR
CD-ROM FILM COLOR
Open Hole 1 I 1
~s. Ewe. CH ~ i,,.9~ ~-I.-~ ~ ~
M-24A 4-1 1-03 Mech. CH 1
, ,
Caliper Survey
Signed:
Print Name:
ProActive Diagnostic Services, Inc., 3 IO K Street Suite 200, Anchorage, AK 99501
Phone:(907) 245-8951 Fax:(907)245-8952 E-mail: pdsanchorage~memorylog.com Website: www.memory_ l_og.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X
ADD PERES Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
2270' FNL, 4698' FEL, Sec. 06, T11N, R13E, UM
At top of productive interval
3277' FNL, 2986' FEL, Sec. 06, T11N, R13E, UM
At effective depth
2972' FNL, 2058' FEL, Sec. 06, T11 N, R13E, UM
At total depth
3013' FNL, 1928' FEL, Sec. 06, T11 N, R13E, UM
5. Type of Well:
Development __X
Exploratory__
Stratigraphic__
Service__
(asp's 829017, 5974.1,00)
(asp's 630750, 5973123)~
(asp's 631671, 5973444)
(asp's 631802, 5973405)
12. Present well condition summary
Total depth: measured
true vertical
10886 feet Plugs (measured)
8799 feet
6. Datum elevation (DF or KB feet)
RKB 63 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
M-24A
9. Permit number / approval number
201-126
10. APl number
50-029-20939-01
11. Field / Pool
Prudhoe Bay Field / Prudhoe Bay Pool'
RECEIVED
Effective depth: measured
true vertical
Casing Length
Conductor 110'
Surface 2647'
Intermediate 8952'
Liner 310'
Tieback Sleeve 371'
Side Track Liner 2263'
10733 feet Junk (measured)
8733 feet
Size Cemented
20" 72 cf Concrete
3746 cf ArcticSet III and
13-3/8"
AS II
2004 cf Class 'G' and
9-5/8"
133 cf PF
7" 315 cf Class 'G'
5" 150 cf Class 'G'
3-3/16" x 2-7/8" 118 cf Class 'G'
APR 1 8 2003
Alaska Oil & Gas Cons. Commission
easured Depth AflchoTir~j~eVertical Depth
145' 145'
2682' 2682'
8987' 8529'
8710'-9020' 8283'-8558'
8659'-9020' 8238'-8558'
8623'-10886' 8207'-8799'
Perforation depth: measured
true vertical
Tubing (size, grade, and measured depth)
Open Perfs 9382'-9384', 9397'-9403', 9580'-9730', 9820'-9900', 9957'-9969', 9972'-9978',
Open Perfs (continued) 10107'-10119', 10122'-10128', 10250'-10350', 10402'-10414',
Open Perfs (continued) 10417'-10423', 10452'-10464', 10467'-10473', 10500'-10719'.
Open Perfs 8759'-8759', 8758'-8758', 8747'-8733', 8729'-8726', 8723'-8722', 8722'-8722',
Open Perfs (continued) 8715'-8714', 8714'-8714', 8710'-8709', 8710'-8710',
Open Perfs (continued) 8710'-8710', 8710'-8710', 8710'-8711 ', 8711 '-8729'.
5-1/2" 17# 13CR80 TBG @ 8664'.
Packers & SSSV (type & measured depth) 9-5/8" x 5-1/2" TIW HBBP PKR @ 8609' MD.
5-1/2" Camco SSSV Landing Nipple @ 2005'.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation 04/04/2003
Subsequent to operation 04/15/2003
OiI-Bbl
322
Representative Daily Averaqe Production or Injection Data
Gas-Mcr Water-Bbl
2073 1385
413 2603 1417
Casing Pressure Tubing Pressure
246
240
15. Attachments
Copies of Logs and Surveys run _
Daily Report of Well Operations __
16. Status of well classification as:
Oil __X Gas __ Suspended _
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
DeWayne R. Schnorr
Form 10-404 Rev 06/15/88 ·
ORIGINAL
Prepared by DeWayne R, Schnorr 564-5174~
SUBMIT IN DUPLICATE
M-24A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
03/31/2003 PERFORATING: DRIFT/TAG
04/01/2003 PERFORATING: DRIFT/TAG
04/07/2003 TESTEVENT--- BOPD: 407, BWPD: 1,674, MCFPD: 5,752, AL Rate: 3,510
04/11/2003 PERFORATING: JEWELRY LOG--DEPTH CONTROL; PERFORATING
04/12/2003 PERFORATING: JEWELRY LOG--DEPTH CONTROL; PERFORATING
04/13/2003 PERFORATING: JEWELRY LOG--DEPTH CONTROL; PERFORATING
EVENT SUMMARY
03/31/03
WELL FLOWING UPON ARRIVAL. RUNNING IN HOLE W/2.00" DUMMY GUN
(PRE CT ADPERF).
04/01/03
DRIFT W/2.00 DG & SB TO 9228' WLM. <<< STOP DUE TO 40 DEG. DOGLEG IN
THIS AREA >>> (NO SAMPLE) (PRE CT PERF). <<< RETURNED TO OPERATOR
TO POP >>>
04/07/03 TESTEVENT --- BOPD: 407, BWPD: 1,674, MCFPD: 5,752, AL Rate: 3,510
04/11/03
MIRU CTU #5. MU/RIH W/1-11/16" MHA & PDS MEM GR/CCL. LOG FROM 10600'-
9200'. FLAG COIL AT 10050'. MU/RIH W/2" HSD PJ 4SPF, CORRECT AT FLAG.
SHOT GUN #1 10452'-10464' & 10467'-10473'. POOH. PT MHA. MU/RIH W/2" HSD
PJ. CORRECT AT FLAG. SHOT GUN #2 10402'-10414' & 10417'-10423'. POOH.
04/12/03
LAY DOWN GUN #2. MU/RIH W/GUN #3, 2" HSD PJ 4SPF. TIE-IN TO FLAG.
SHOT INTERVAL 10107'-10119'& 10122'-10128'. RIH W/PDS MEMORY TOOLS.
LOG 9100'-10100', FLAG PIPE AT 9330'. MU/RIH W/GUN #4, 2" HSD PJ 4SPF. TIE-
IN, SHOT INTERVAL 9957'-9969' & 9972'-9978'. STANDBY DUE TO HIGH WINDS.
04/13/O3
LAY DOWN GUNS FROM RUN #4. MU/RIH W/2" HSD PJ GUNS. TIE-IN TO FLAG
AT 9330', SHOOT INTERVAL 9382'-9394' & 9397'-9403'. RDMO, NOTIFY PAD
OPERATOR. **WELL LEFT FLOWING W/GL.**
Fluids Pumped
BBLS
PRESSURE TEST LUBRICATOR W/DIESEL ( 2 TESTS)
355 METHANOL WATER
70 2% KCL WATER
425 TOTAL
Page 1
M-24A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
ADD PERFS
04/11-13/2003
THE FOLLOWING INTERVALS WERE PERFORATED USING THE 2" HSD POWERJET, 4 SPF,
60 DEGREE PHASING, RANDOM ORIENTATION.
9382' - 9394'
9397' - 9403'
9957' - 9969'
9972' - 9978'
10107'- 10119'
10122'- 10128'
10402' - 10414'
10417' - 10423'
10452' - 10464'
10467' - 10473'
Page 2
To:
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
January 16, 2003
MWD Formation Evaluation Logs' M-24A,
AK-MW-Ill29
M-24A:
Digital Log Images
50-029-2093 9-01
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A CoPY OF'THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (.Alaska) Inc.
Petro-technical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
JAN 2_ 1 200
,, T'o
WELL LOG TRANSMITTAL
To: State of Alaska August 21, 2002
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
RE: MWD Formation Evaluation Logs M-24A, AK-MW-11129
1 LDWG formatted Disc with verification listing.
APl#: 50-029-20939-01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
REOEIYED
10/05/01
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 1510
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job # Log Description Date Blueline Sepia Prints CD
L2-18A I c~_ / 0 ~ LEAK DETECTION LOG 09117/01 I 1
MPC-24 ~/~.1: '-(~ Hq 21385 PERF RECORD GR(PDC) 08/02/01 1
D.S. 11-01A /c;)=-,~ .-)1 ~, 21392 RST-SIGMA 06/09/98 1
P1-02 I ~'~' - ~ ~)_~ 21231 RST-SIGMA 04121101 1 1 1
B-05~ j,_.,_~cl I ~./_~'"_.~ - - 21332 MCN L 06129/01 1 I 1
D.S. 11-01A ~c~o~' _ i ic,~ 21232 RST-SIGMA 04/28/01 I 1 1
M-24A c:~,OI- Io'~(~ 21360 MCNL 08104101
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
RECEIVED
OCT 1 6 2.001
Alaska Oil & Gas Cons. Commission
An~orage
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Received by~ ~j
06/04/02
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
NO. 2124
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Affn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job # Log Description Date Blueline Sepia Prints CD
e-07 J -7 ~-OOc~ 22222 RST-SIGMA 04/13/02 1 1 1
M-24A ~ 01- la ~ 22223 MCNL 04/14/02 1 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
RECEIVED
,, 2002
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATrN: Sherrie
Received ~ ~
STATE OF ALASKA i
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
I~! Oil [] Gas [] Suspended [] Abandoned [] Service [] TSUSP
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 201-126
'3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-20939-01
1111 l _1 ii
4. Location of well at surface ~'-.~7,~7;.:.:~::-_:.:-::.-~ 'LOCA~ 9. Unit or Lease Name
2269' SNL, 195' EWL, SEC. 06, T11N, R13E, UM "-'" .... ~' '-':" ;
At top of productive interval '. ........ ~':; ?'::'7_' @J_ ~ '! ,~:,.~f~~¥~~lt~ Prudhoe Bay Unit
3277' SNL, 1911' EWL, SEC. 06, T11N, R13E, UM
At total depth I__~.~!~ ! ~~i 10. Well Number
3013' SNL, 2968' EWL, SEC. 06, T11 N, R13E, UM .................... :..~: ~ ' M-24A
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 62.70' ADL 028282
12. Date Spudded7/29/2001. 113' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband'812/2001 8/4/2001 115' water depth' if °ffsh°reN/A MSL 116' N°' °f c°mpleti°nsOne
17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD).19. Directional Survey 120. Depth where SSSV set121. Thickness of Permafrost
10886 8799 FTI 10733 8733 FTI [] Yes [] No (Nipple) 2005' MD 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, RES, GR, CCL, MEMORY CNL
23. CASING~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" X 30" Insulated Conductor Surface 110' 36" B cu yds Concrete
13-3/8" 72# L-80 Surface 2683' 17-1/2" 3746 cu ft Arcticset III and AS II
9-5/8" 47# L-80 Surface 8987' 12-1/4" 2004 cu ft Class 'G'I 133 cuft PF
7" 26# L-80 8710' 9020' 8-1/2" 315 cu ft Class 'G'
5" 18# NT13Cr80' 8659' 9020' N/A 150 cu ft Class 'G' (Tieback Sleeve)
3-3n6,,x2-7/8.6.2# / 6.16# L-80 8623' 10886' 3-3/4" 118 cu ft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD)
2" Gun Diameter, 4 spf 5-1/2", 17#, NT13Cr80 8659' 8609'
MD TVD MD TVD
9580' - 9730' 8747' - 8733'
9820' - 9900' 8729' - 8726' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
10250' - 10350' 8710' - 8709' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10500' - 10719' 8711' - 8729' 2000' Freeze Protected with MeOH
,,
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
August 12, 2001 Gas Lift
Date of Test; Hours Tested PRODUCTION FOR 01L-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
9/3/2001 4 TEST PERIOD 1469 9763 426 75.54"I 6644
Flow Tubing Casing Pressure CALCULATED elL'DEL GAS'MCF WATER'BBL OIL GRAVITY-APl (CORR)
Press. 24-HouR RATE 26.8
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
ti.,... %.,~ ..=.
SEP i 2001
Form 10-407 Rev. 07-01-80
ORIGINAL ~1~a;~a Oii & ~;~h°rage
Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
Shublik 'A' 9053' 8588'
Shublik 'B' 9095' 8629'
Shublik 'C' 9120' 8652'
Top of Sadlerochit 9140' 8670'
31. List of Attachments: Summary of Daily Drilling Reports, Surveys
--
. --.
32. I hereby certifY that the foregoing is true and correct to th'e best of my knowledge
Signed TerrieHubble.,~~ ~ Title TechnicalAssistant Date
M-24A 201-126
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM '16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
BP EXPLORATION Page I of 9
Operations Summary Report
Legal Well Name: M-24
Common Well Name: M-24A Spud Date: 6/4/1991
Event Name: REENTER+COMPLETE Start: 7/25/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
7/25/2001 12:00 - 14:30 2.50 MOB P PRE MOVE NORDIC 1 FROM M-38 TO M-24A. ACCEPT RIG AT
1430 ON 7-25-01
14:30 - 16:30 2.00 MOB P PRE MOVE RIG OVER WELL. NU BOPS. LOAD KCL WATER
INTO PITS.
16:30 - 21:00 4.50 BOPSUR P DECOMP TEST BOPE AS PER REGS. WITNESS WAIVED BY
J.CRISP AOGCC. NO FAILURES.
21:00 - 22:00 1.00 BOPSUR P DECOMP CHANGE PACK OFFS. RE-HEAD COIL. TEST SAME.
22:00 - 23:00 1.00 BOPSUR P DECOMP TEST REEL VALVES.
23:00-23:15 0.25 KILL P DECOMP OPEN MASTER TO CHECK WELL. NO PRESS, SLIGHT
VAC.
23:15 - 23:30 0.25 KILL P DECOMP HOLD PRE JOB MTG REGARDING BHA & KILL
PROCEDURES
23:30 - 00:00 0.50 KILL P DECOMP MU CEMENTING BHA. (NOZZLE W/2 JTS PH6)
7/26/2001 00:00 - 01:30 1.50 STWHIP P WEXlT RIH WITH NOZZLE. PUMP DOWN COIL & CT ANNULUS AT
4 BPM TOTAL.
01:30 - 01:45 0.25 STWHIP P WEXlT TAG WS AT 9043 CTD. CORRECT TO 9020'. WELL ON
VACUUM. 30K# UP, 24K#DN WT.
01:45 - 02:00 0.25 STWHIP P WEXlT HOLD PRE JOB WITH CEMENT CREWS & OTHERS.
02:00 - 03:15 1.25 STWHIP P WEXlT TEST LINES TO 4000 PSI. MIX 13.8 BENTONITE SLURY ON
FLY. PUMP 5 B NEAT, 12 B 20PPB AGG, 10 B NEAT.
DISPLACE WITH KCL WATER. ClP AT 0315.
03:15 - 04:15 1.00 STWHIP P WEXlT POOH TO SAFETY @ 7500'. CIRC AT MIN RATE. SOME
GAS IN RTNS.
04:15 - 04:30 0.25 STWHIP P WEXIT RIH. WASH CEMENT TO 9020'. GAS CLEARED UP.
APPEAR TO HAVE 1:1 RTNS. LOSTALL RTNS JUST AS
NOZZLE REACHED WHIPSTOCK.
04:30 - 05:30 1.00 S'I'WHIP P WEXIT POOH TO 5000'. CIRC AT MIN RATE.
05:30 - 08:00 2.50 STWHIP P WEXIT CIRCULATE AND WAIT ON WATER & CEMENTERS. 0.4
BPM, NO RETURNS.
08:00 - 08:20 0.33 S'I'WHIP P WEXIT INJECTION TEST ON WELL. HELD 1000 PSI SOLID.
CHART PRESS TEST OF CMT PLUG. 1000 PSI, 15 MIN.
LOST 80 PSI IN 20 MIN. GOOD TEST.
08:20 - 09:20 1.00 STWHIP P WEXIT RIH TO WHIPSTOCK, 1.1 BPM, FULL RETURNS. TAG
WHIPSTOCK AT 9037 FT. CORRECT TO 9020 FT. PULL
TO 8974'. FLAG PIPE AT 8900 FT EOP.
09:20 - 09:30 0.17 S'rWHIP P WEXIT PRESS TEST CMT PLUG TO 1000 PSI AGAIN. GOOD
TEST.
09:30 - 11:30 2.00 STWHIP P WEXIT POOH WITH NOZZLE.
11:30 - 12:30 1.00 STWHIP' P WEXIT M/U MWD BHA #1 WITH 2.5 DEG MOTOR AND 4.0" HC DIA
SPEED MILL.
12:30 - 14:15 1.75 STWHIP P WEXIT RIH WITH MWD MILLING BHA #1. SHALLOW TEST TOOLS
AT 4500'. RIH.
14:15 - 14:30 0.25 STWHIP P WEXIT TAG WHIPSTOCK AT 9015 FT, CORRECT TO 9020 FT.
ORIENT TF TO 160 R. WHIPSTOCK TRAY AT 158 R.
14:30 - 16:30 2.00 STWHIP P WEXIT MILL WINDOW, 2.7 BPM, 2480 PSI, TF= 160R, 2800 WOB,
FULL RETURNS.
MILL TO 9020.7 FT.
16:30 - 18:00 1.50 STWHIP P WEXIT MILL WINDOW, 2.7 BPM, 2480 PSI, TF = 160R, 4000 WOB,
FULL RETURNS
MILLING WITH 0.5 PP.I~ B. IOZAN / WATER.
MILLED TO 9021.3 FT.
18:00 - 20:00 2.00 STWHIP'P WEXIT MILL WINDOW, 2.7 BPM, 2900 PSI, TF = 150R, 4000 WOB,
FULL RETURNS.
Printed: 8/6/2001 1:38:40 PM
BP EXPLORATION Page 2 of 9
Operations Summary Report
Legal Well Name: M-24
Common Well Name: M-24A Spud Date: 6/4/1991
Event Name: REENTER+COMPLETE Start: 7/25/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
7/26/2001 18:00 - 20:00 2.00 STWHIP P WEXIT MILLED TO 9022'
20:00 - 22:00 2.00 STWHIP P WEXlT MILL WINDOW, 2.7/2900 PSI, TF:138R, 6000~ WOB, MILL
TO 9023'.
22:00 - 23:15 1.25 STWHIP P WEXlT MILLING WINDOW, 2.7/3050, TF:132, 6500# WOB, MILL
TO 9023.4'.
23:15 - 00:00 0.75 STWHIP P WEXlT PU TO CHECK FREE SPIN. NOW 2850 PSI. WAS 2400 PSI.
RE TIME DRILL FROM 9022.4' AT 0.1 PER 5 MIN. TF:160R.
BACK TO 9023.4'
7/27/2001 00:00 - 01:00 1.00 STWHIP P WEXlT MILLING WINDOW. 2.713150, TF:125R, 7000#WOB MILL
TO 9024.5'
01:00 - 01:30 0.50 STWHIP P WEXlT PU & ORIENT TO 177L (OFF BTM) REACTIVE TF:155r.
CONTINUE MILLING.
01:30 - 04:15 2.75 STWHIP P WEXIT MILLING AHEAD. 2.6/2800FS/200-300 DPSl, TF:155R, 6500#
WOB. MILL TO 9026.6'. SEVERAL STALLS. LOST ALL
RETURNS.
04:15 - 08:00 3.75 STWHIP N DPRB WEXlT ORDER OUT MUD. REMAIN NEAR BTM AND CIRC AT MIN
RATE WHILE WAITING ON MUD.
08:00 - 12:30 4.50 STWHIP N DPRB WEXlT RIH WHILE CIRC IN NEW FLOPRO. NO RETURNS AT 2.5
BPM WITH WATER ON FORMATION. 0.4 BPM RETURNS
AT 2.5 BPM AT 80 BBLS PUMPED. PUMP TOTAL OF 150
BBLS. RETURNS STILL AT 0.4 BPM. ORDER LCM PIILL.
12:30 - 13:30 1.00 STWHIP N DPRB WEXlT PUMP LCM PILL. HAD FULL RETURNS AFTER 20 BBLS OF
PILL WAS AT WINDOW. LAY IN PILL. FULL RETURNS.
MWD TOOLS STOPPED SENDING SIGNAL WHEN FIRST
OF LCM REACHED BHA.
13:30 - 15:00 1.50 STWHIP P WEXIT POOH WITH MILLING BHA #1. SWAP WELL OVER TO
FLOPRO.
15:00 - 16:10 1.17 STWHIP P WEXIT AT SURFACE, CHANGE OUT MOTOR, ORIENTOR, MWD
AND RE-RUN
MILL #1. [IN GAUGE, 30% WORN, WEAR ACROSS FACE.]
16:10 - 17:45 1.58 STWHIP P WEXlT RIH WITH MWD MILLING BHA #2. STRAIGHT MOTOR AND
4.0" DIA HC MILL.
SHALLOW TESTED MWD TOOLS, SHUT IN WELL AND
APPLIED 820 PSI SIWHP, SQUEEZE PRESSURE ON TOP
OF LCM PILL. HELD TIGHT. RIH.
17:45 - 18:00 0.25 STWHIP P WEXlT STOP AT 6400 FT. APPLY 1,100 PSI TO LCM PILL. HELD
TIGHT. RIH.
18:00 - 19:30 1.50 STWHIP P WEXlT LOG TIE-IN WITH GR. TIED-IN AT 8825 FT. -16'
CORRECTION.
19:30-21:00 1.50 STWHIP P WEXlT RIH. TAG TOP WlNDOW/WS AT 9020'. 2.7/3000FS. MILL
AHEAD
21:00 - 00:00 3.00 STWHIP' P WEXIT MILL AHEAD VERY SLOWLY. 2.6/2950/3200 PSI, LOSING
0.5 BPM MUD. 9026.6'. VERY HIG WOB. MILL TO 9027.2'
7/28/2001 00:00 - 03:00 3.00 STWHIP P WEXIT CONTINUE TO MILL WINDOW AT 9027.5'. 2.6/3000FS/300
DPSI. 22K#"WOB" MILL TO 9029'. LOSSES VARYING
FROM 0.5 TO 1.0 BPM.
03:00 - 03:45 0.75 STWHIP P WEXlT CIRCULATE 5 BBLS 15 PPB LCM PILL (OM SEAL + QUIK
SEAL). LAY IN 1:1. SQUEEZE ALL AWAY. BUILT UP TO
500 PSI, THEN BACK TO 120 PSI.
03:45 - 05:15 1.50 STWHIP P WEXIT MILL TO 9030'. 23K# "WOB" 2.6/2700 FSI300 DPSI.
!UNABLE TO MAKE ANY MORE PROGRESS. 0.5 BPM TO
0.0 LOSS RATE.
05:15 - 07:00 1.75 STWHIP P WEXlT POOH FOR BHA CHANGE.
Printed: 8/6/2001 1:38:40 PM
BP EXPLORATION Page 3 of 9
Operations Summary Report
Legal Well Name: M-24
Common Well Name: M-24A Spud Date: 6/4/1991
Event Name: REENTER+COMPLETE Start: 7/25/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
7/28/2001 07:00 - 09:00 2.00 STWHIP P WEXlT LAY OUT MWD, MOTOR AND MILL. MILL WORN IN
CENTER. 70% WEAR.
DECIDE ON NEW 3.80" HC DIAMOND MILL AND STRAIGHT
MOTOR.
LAY OUT SPERRY MWD TOOLS AND CLEAR LCM FROM
TOOLS.
09:00 - 10:00 1.00 STWHIP P WEXlT M/U 3.80" HC DIA MILL #2, STRAIGHT MOTOR, 2 JTS PH6
AND DS MHA.
10:00 - 11:45 1.75 STWHIP P WEXlT RIH WITH MILLING BHA #3. NO RETURNS, PUMP 0.2 BPM.
11:45 - 12:15 0.50 STWHIP P WEXIT STOP AT FLAG AT 8900' EOP, CORRECT -22 FT CTD. RIH.
12:15 - 13:30 1.25 STWHIP N DPRB WEXlT LAY IN 5 BBL LCM PILL. PULL ABOVE PILL TO 8700'.
CIRC. NO RETURNS.
13:30 - 15:00 1.50 ST'WHIP N DPRB WEXlT MIX 25 PPB OM SEAL AND MIX2 INTO 20 BBL FLOPRO.
DISPLACE PILL TO WINDOW. LAY IN 5 BBLS, GOT
RETURNS, SHUT IN WELL AND SQZ
10 BBLS AWAY. 225 PSI SlWHP WHILE PUMPING 0.7 BPM.
STOP PUMP WHP FELL SLOWLY TO 0 PSI.
15:00 - 15:45 0.75 STWHIP N DPRB WEXIT MIX 35 PPB MIX2 AND CACO3 INTO 20 BBL FLOPRO.
15:45 - 16:30 0.75 STWHIP N WAIT WEXlT WAIT ON FLOPRO FOR DISPLACEMENT VOLUME.
16:30 - 17:50 1.33 STWHIP N DPRB WEXlT PUMP 20 BBL LCM PILL AND DISPLACE WITH FLOPRO.
LAID IN 5 BBLS. SQZ'D 18 BBLS AWAY. HELD 220 PSI
WHP WHILE PUMPING AWAY AT 0.5 BPM. SHUT IN WHP
FELL FROM 220 - 0 PSI IN 10 MIN. CIRC. ABOVE PILL 2.5
BPM / 1.4 BPM RETURNS.
17:50 - 18:30 0.67 STWHIP P WEXIT MILL TO SEE IF LOSSES WILL INCREASE. 2.4 / 1.4 BPM AT
START.
9022.7 FT, 8000# WOB.
18:30 - 19:30 1.00 STWHIP P WEXIT 9023.2 FT, 8000# WOB. 2.4 / 1.1 BPM. MILLING
PROGRESS OF 0.5 FT. LOSSES INCREASED TO 1.3 BPM.
MIXING ANOTHER LCM PILL. MILL TO 9023.6'
19:30 - 20:30 1.00 STWHIP P WEXIT PUMP 30PPB LCM PILL. LAY IN 1:1. SHUT-IN WELL AND
SQUEEZE AWAY AT 1 BPM. WHP INCREASED TO 320 PSI.
BLED TO 20 PSI IN 5 MINUTES.
20:30 - 22:00 1.50 STWHIP C WEXlT POOH FOR CEMENT PLUG & BHA.
22:00 - 22:30 0.50 STWHIP C WEXlT LD MOTOR. 3.8 DSM SHOWED WEAR ACROSS ENTIRE
FACE. MU CEMENT NOZZLE.
22:30 - 00:00 1.50 STWHIP C WEXlT RIH WITH CEMENT ASSY.
7/29/2001 00:00 - 00:30 0.50 STWHIP C WEXIT CONTINUE IN HOLE. RU DS CEMENTERS. SPOT
TRUCKS.
00:30 - 00:45 0.25 STWHIP C WEXlT HOLD PRE JOB & SAFETY MTG WITH CREWS
REGARDING CEMENT JOB.
00:45 - 02:00 1.25 STWHIP C WEXlT PUMP 5 BBLS KCL. TEST LINES TO 4000 PSI. PUMP 3
BBLS NEAT CLASS G, 13.8 PPG, 10 G W/20 PPB AGG, 2
BBLS NEAT G, 10 KCL WATER. DISPLACE WITH KCL
FROM PITS.
02:00 - 02:30 0.50 STWHIP C WEXIT LAY IN 3 BBLS 1:1 SQUEEZE 15 BBLS AWAY. WHP 200
PSI MAX. POOH TO SAFETY.
02:30 - 03:30 1.00 STWHIP~ C WEXIT CIRCULATE & WAIT ON ADDITIONAL AGGREGATE FROM
YARD.
03:30 - 04:00 0.50 STWHIPi C WEXIT PUMP 5 BBLS WATER, 3 BBLS NEAT G, 10 BBLS G W/20
;PPB AGG, 2 BBLS NEAT, DISPLACE WITH KCL. CIP @
0400.
04:00 - 05:15 1.25 STWHIP C WEXIT LAY IN 3 BBLS 1:1. SQUEEZE 13.5 TOTAL. FINAL
Printed: 8/6/2001 1:38:40 PM
BP EXPLORATION Page 4 of 9
Operations Summary Report
Legal Well Name: M-24
Common Well Name: M-24A Spud Date: 6/4/1991
Event Name: REENTER+COMPLETE Start: 7/25/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity'Code NPT Phase Description of Operations
7/29/2001 04:00 - 05:15 1.25 STWHIP C WEXlT WHP:450 PSI. SLOWLY BLED OFF TO ZERO AFTER 30
MIN.
05:15 - 07:00 1.75 STWHIP C WEXlT POOH FOR MILLING BHA. FILL ACROSS THE TOP.
07:00 - 07:15 0.25 S'fWHIP P WEXlT M/U STRAIGHT MOTOR AND NEW 4.0" HC DIA MILL.
07:15 - 09:00 1.75 STWHIP P WEXlT RIH TO 9000 FT. WITH MIN PUMP. NO SIGN OF CEMENT.
PULL UP TO 8800' AND WOC. ClRC 0.5 BPM WITH FULL
RETURNS WHILE WOC.
09:00 - 12:00 3.00 STWHIP P WEXlT WOC, ClRC 0.5 BPM WITH FULL RETURNS. RIH TO 9010
FT AT 11:00 HRS. NO CEMENT. WAIT 1 MORE HOUR.
ClRC WITH FULL RETURNS.
12:00- 15:00 3.00 STWHIP P WEXlT MILLWlNDOW. SAWTOP OF WHIPSTOCK AT 9010 FT.
CORRECT TO 9020 FT. REAM IN HOLE TO 9028 FT.
MILLING WINDOW STARTING AT 9028 FT.
2.4 / 2.4 BPM, 1400 PSI, FULL RETURNS. MILLED TO
9030.5 FT.
15:00 - 15:15 0.25 s'rWHIP P WEXlT MILL WINDOW. FULL RETURNS, 2.5 / 2.5 BPM, 1400 PSI,
EXIT 7" LINER AT 9031 FT. 11 FT WINDOW. TOP AT 9020
FT. BOTTOM AT 9031 FT. ORDER FLOPRO.
15:15 - 16:00 0.75 STWHIP P WEXlT MILL FORMATION TO 9042 FT. 2.6~ 2.6 BPM, FULL
RETURNS.
16:00 - 17:30 1.50 STWHIP P WEXIT REAM WINDOW AREA FROM 9020 - 9031 FT. DRIFT
WINDOW DRY,
CLEAN WINDOW. TD = 9,042 FT.
17:30 - 19:00 1.50 STWHIP P WEXlT POOH WITH MILLING BHA. RED FLAG AT 8910 FT EOP.
19:00-20:00 1.00 DRILL P PROD1 MU BUILD ASSY #1 (BHA#6)
20:00 - 21:45 1.75 DRILL P :PROD1 RIH W/DRILLING ASSY. BEGIN DISPLACEMENT TO MUD.
21:45 - 22:15 0.50 DRILL P PROD1 TIE INTO FLAG. ORIENT TO 175r. THROUGH WINDOW NO
PROBLEM.
22:15 - 00:00 1.75 DRILL P PROD1 DRILLING BUILD. 2.6/2700/TF:161R.
7/30/2001 00:00 - 00:30 0.50 DRILL P PROD1 DRILLING BUILD. 2.5/2950/TF:130R DRILL TO 9067'.
00:30 - 01:30 1.00 DRILL P PROD1 POOH. ORIENT ABOVE WINDOW. TRY EVERYTHING.
UNABLE TO ORIENT.
01:30 - 03:00 1.50 DRILL N DFAL PROD1 POOH FOR ORIENTER.
03:00 - 03:30 0.50 DRILL N DFAL PROD1 CHANGE OUT ORIENTER. ALSO REPLACE SIZE 13 JET
WITH SIZE 12 JET IN EQUAL. SUB. BIT OK.
03:30 - 05:15 1.75 DRILL N DFAL PROD1 RIH. Slit MWD. CONTINUE IN HOLE.
05:15 - 05:45 0.50 DRILL N DFAL PROD1 ORIENT ABOVE WINDOW. UNABLE TO ORIENT.
05:45 - 07:00 1.25 DRILL N DFAL PROD1 POOH TO WORK ON ORIENTER.
07:00 - 08:00 1.00 DRILL N DFAL PROD1 CHANGE OUT ORIENTER, GO TO 11/32" ORIFICE. TEST
AT SURFACE.
GOT 3 OF 3 CLICKS. OK.
08:00 - 09:50 1.83 DRILL N DFAL PROD1 RIH WITH BHA #8, 2.8 DEG SR MOTOR, M-09 BIT, 11/32"
ORIFICE. SHALLOW TEST ORIENTER. OK. RIH.
09:50 - 10:00 0.17 DRILL N PROD1 ORIENT TO LOW SIDE.
10:00 - 10:10 0.17 DRILL N PROD1 RIH. CLEAN WINDOW. TAG TDAT 9084 FT, CORRECTTO
9067 FT. [-17'].
10:10 - 10:30 0.33 DRILL P PROD1 DRILLING, TF=144R. ROP=40 FPH. 2.4/2.4 BPM, 3200 PSI.
DRILL TO 9075'
10:30- 11:00 0.50 DRILL P PROD1 ORIENTTFTO 90R.
11:00 - 13:20 2.33 DRILL P PROD1 DRILLING, TF=80R. 2.6/2.6 BPM, 3200, INCL=20, 30 FPH.
DRILLED TO 9135'.
13:20 - 15:20 2.00 DRILL P PROD1 DRILLING, TF=50R, 2.6/2.6 BPM, 3200, INCL--35, 40 FPH,
DRILLED TO 9190'.
Printed: 8/6/2001 1:38:40 PM
BP EXPLORATION Page 5 of 9
Operations Summary Report
Legal Well Name: M-24
Common Well Name: M-24A Spud Date: 6/4/1991
Event Name: REENTER+COMPLETE Start: 7/25/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activityl Code NPT Phase Description of Operations
7/30/2001 15:20 - 16:10 0.83 DRILL P PROD1 DRILLING, TF--45R, 2.5~2.5 BPM, 3200, INCL=45, 80 FPH,
DRILLED TO 9230'.
16:10 - 16:30 0.33 DRILL P PROD1 WIPER TRIP TO WINDOW. HOLE WAS CLEAN.
16:30 - 17:40 1.17 DRILL P PROD1 DRILLING, TF-45R, 2.4/2.4 BPM, 3100, INCL-70, 80 FPH,
DRILLED TO 9300'.
17:40 - 18:30 0.83 DRILL P PROD1 DRILLING, TF=45R, 2.4~2.4 BPM, 3100, INCL=80, 80 FPH,
DRILLED TO 9330 '.
CIRC. UP SURVEY,
18:30 - 18:50 0.33 DRILL P PROD1 WIPER TRIP TO WINDOW. HOLE CLEAN.
18:50- 19:00 0.17 DRILL P PROD1 ORIENTTF. 90R
19:00 - 20:30 1.50 DRILL P PROD1 DRILL AHEAD 2.5~3000, TF:90R, 60 FPH, INC:93
20:30 - 20:45 0.25 DRILL P PROD1 ORIENT OUTSIDE WINDOW.
20:45 - 21:45 1.00 DRILL P PROD1 DRILL AHEAD 2.6~2900, TF:85R, 60-80 FPH. DRILLING AT
9420'
21:45 - 22:15 0.50 DRILL P PROD1 ORIENT OUTSIDE WINDOW.
22:15 - 00:00 1.75 DRILL P PROD1 DRILL AHEAD TO 9480'. TF:76R
7/31/2001 00:00 - 01:00 1.00 DRILL P PROD1 DRILL TO 9500'. END OF BUILD & TURN. INCL -- 91DEG.
01:00 - 02:45 1.75 DRILL P PROD1 POOH FOR LATERAL / RESISTIVITY ASSY.
02:45 - 05:00 2.25 DRILL P PROD1 LD BUILD ASSY. MU LATERAL W/ RESISTIVITY. 0.7 DEG
MOTOR & DS49
05:00- 06:50 1.83 DRILL P PROD1 RIH. SliT MWD. CONTINUE IN HOLE.
:06:50 - 07:30 0.67 DRILL P PROD1 TIE-IN WITH GR AT RA TAG. [-17 FT CTD]
07:30 - 07:45 0.25 DRILL P PROD1 RIH TO TD. TAG TD AT 9499 FT.
07:45 - 09:15 1.50 DRILL P PROD1 LOG UP WITH RESISTIVITY / GR FROM 9499 - 9150 FT.
RIH TO TD.
09:15 - 09:50 0.58 DRILL P PROD1 ORIENT TF.
09:50 - 12:00 2.17 DRILL P PROD1 DRILLING, TF=50R, 2.6/2.6 BPM, 2900, INCL=92, 110 FPH,
DRILL TO 9650'.
12:00 - 13:00 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW. HOLE CLEAN.
13:00 - 13:20 0.33 DRILL P PROD1 DRILLING, TF=74R, 2.4 / 2.4 BPM, 2700, INCL=95, 110 FPH,
DRILL TO 9674'.
13:20 - 15:15 1.92 DRILL P PROD1 POOH FOR HIGHER BEND MOTOR. ONLY GETTING 8.0
DEG DLS AND NEED 10 DEG DLS FOR TURN.
KICK DRILL, 30 SEC.
15:15 - 17:15 2.00 DRILL P PROD1 CHANGE OUT MOTOR AND RESISTIVITY TOOL. DOWN
LOAD RES. M/U 1.08 DEG MOTOR. RE-RUN DS49 BIT.
TEST RESISTIVITY TOOL.
17:15 - 20:00 2.75 DRILL P PROD1 RIG-UP TO CUT OFF CT. HELD PJSM. CUT OFF 200 FT CT.
RE-HEAD CTC. PULL / PRESS TEST CTC - OK.
20:00- 21:05 1.08 DRILL P PROD1 RIH BHA#10. SHT MWD. CONTINUE IN HOLE.
21:05 - 22:10 1.08 DRILL P PROD1 TIE-IN WITH GR AT RA TAG. [-18 FT CTD]
22:10 - 22:30 0.33 DRILL P PROD1 RIH TO TD. TAG TD AT 9680 FT.
22:30 - 23:30 1.00 DRILL P PROD1 LOG UP (MAD PASS) WITH RESISTIVITY / GR FROM 9675
- 9483 FT. RIH TO TD.
23:30 - 00:00 0.50 DRILL P PROD1 DRILLING, TF=100R, 2.4 / 2.4 BPM, 2600, INCL=95.95, 115
FPH, DRILL TO 9715'.
8/1/2001 00:00 - 02:00 2.00 DRILL P PROD1 DRILLING, 2.4 / 2.4 BPM, 2600 PSI, 100 FPH, DRILLED TO
9830 FT.
02:00 - 03:00 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW. RIH.
03:00 - 06:00 3.00 DRILL P PROD1 DRILLING. 2.6 / 2.6 BPM, 2900 PSI, 80 FPH, DRILLED TO
9998 FT.
06:00 - 07:00 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW. MOTOR WORK AT 9420 FT.
RIH.
Printed: 8/6/2001 1:38:40 PM
BP EXPLORATION Page 6 of 9
Operations Summary Report
Legal Well Name: M-24
Common Well Name: M-24A Spud Date: 6/4/1991
Event Name: REENTER+COMPLETE Start: 7/25/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity, Code NPT Phase Description of Operations
8/1/2001 07:00 - 09:00 2.00 DRILL P PROD1 DRILLING, 2.6 / 2.6 BPM, 2900, TF=90R, INCL--94, 120 FPH,
DRILL TO 10,095FT.
09:00 - 09:30 0.50 DRILL P PROD1 ORIENT TF TO 80R.
09:30 - 10:15 0.75 DRILL P PROD1 DRILLING, 2.7/2.7 BPM, 3000, TF=80R, INCL=92, 100 FPH,
DRILL TO 10150FT.
10:15 - 11:00 0.75 DRILL P PROD1 WlPERTRIPTOWlNDOW.
11:00 - 11:40 0.67 DRILL P PROD1 LOG TIE-IN WITH GR AT RA MARKER. ADD 3 FT CTD.
11:40 - 12:10 0.50 DRILL P PROD1 RIH TO TD. TAG AT 10,153 FT.
12:10 - 13:20 1.17 DRILL P PROD1 DRILLING, 2.6 / 2.6 BPM, 3000, TF=85R, 90 FPH, INCL=92,
DRILL TO 10,210FT.
13:20 - 13:45 0.42 DRILL P PROD1 ORIENT TF TO LEFT SIDE.
13:45 - 15:30 1.75 DRILL P PROD1 DRILLING, 2.6~2.6 BPM, 3000, TF=95L, 80 FPH, INCL= 91,
SWAP TO NEW FLOPRO. [1,220 FT ON OLD FLOPRO].
DRILLED TO 10,300 FT.
15:30 - 16:40 1.17 DRILL P PROD1 WIPER TRIP TO WINDOW. RIH. MOTOR WORK AT 9410
AND 9470FT.
16:40 - 18:00 1.33 DRILL P PROD1 iDRILLING, 2.6/2.6 BPM, 2900, TF--81L, 100 FPH, INCL=90,
DRILL TO 10,385FT.
18:00 - 18:20 0.33 DRILL P PROD1 ORIENT TF TO RIGHT SIDE.
18:20 - 19:15 0.92 DRILL P PROD1 DRILLING, 2.5/2.5 BPM, 3050, TF-45R, 90 FPH, INCL=89,
DRILL TO 10,425FT. HIGH REACTIVE TORQUE, POSSIBLY
CROSSING 2ND FAULT.
19:15 - 19:45 0.50 DRILL P PROD1 ORIENT AROUND TO 90R.
19:45 - 21:00 1.25 DRILL P PROD1 DRILLING, 2.5/2.5 BPM, 3050, TF-90R, 130 FPH, INCL=89,
DRILL TO 10,500FT.
21:00 - 22:15 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW.
22:15 - 23:15 1.00 DRILL P PROD1 DRILLING, 2.5/2.5 BPM, 3050, TF=65R-45R, 130 FPH,
'INCL=89, DRILL TO 10,582FT.
23:15 - 23:30 0.25 DRILL P PROD1 I ORIENT TF TO LEFT SIDE.
23:30 - 00:00 0.50 DRILL P PROD1 .DRILLING, 2.5~2.5 BPM, 3050, TF=163L, 100 FPH, INCL=92,
DRILL TO 10,615FT. START DROPPING TRAJECTORY
FROM 10,600FT.
8/2/2001 00:00 - 00:10 0.17 DRILL P PROD1 ORIENT TF TO 120L.
00:10 - 01:20 1.17 DRILL P PROD1 DRILLING, 2.5~2.5 BPM, 3050, TF=122L, 100 FPH, INCL=75,
DRILL TO 10,707FT.
01:20 - 02:55 1.58 DRILL P PROD1 WIPER TRIP TO WINDOW. OVERPULL @ 10450 FT.
02:55 - 03:10 0.25 DRILL P PROD1 DRILLING, 2.7/2.7 BPM, 3100, TF-130L, 130 FPH, INCL=73,
DRILL TO 10,732FT.
03:10 - 03:25 0.25 DRILL P PROD1 ORIENT TF TO 180LS.
03:25 - 04:00 0.58 DRILL P PROD1 DRILLING, 2.6~2.6 BPM, 3100, TF=180LS, 100 FPH, INCL=69,
DRILL TO 10,761FT & CROSS END OF POLYGON.
04:00 - 05:00 1.00 DRILL P PROD1 DRILLING, 2.6~2.6 BPM, 3100, TF=163L, 100FPH, INCL=58,
DRILL TO AND TD WELL @ 10,880FT. OWC ESTIMATED
TO BE @ 10,820'.
05:00 - 06:00 1.00 DRILL P PROD1 WIPER TRIP 'FO WINDOW.
06:00 - 06:20 0.33 DRILL P PROD1 TIE-IN WITH GR AT RA TAG. [+6 FT CTD]
06:20 - 07:20 1.00 DRILL P PROD1 RBIH TO TD. CLEAN HOLE. TAG TD AT 10,886 FT BKB.
FINAL TD.
07:20 - 09:30 2.17 DRILL P PROD1 MAD PASS RESISTIVITY / GR TO WINDOW. 1000 FPH TO
9600 FT. 500 FPH TO WINDOW.
09:30 - 11:30 2.00 DRILL P PROD1 POOH WITH DRILLING BHA.
11:30 - 12:00 0.50 DRILL P PROD1 LAY OU'F DRILLING BHA. BIT IN NEW CONDITION.
12:00 - 13:00 1.00 DRILL P PROD1 DOWNLOAD RESISTIVITY DATA.
Printed: 816/2001 1:38:40 PM
BP EXPLORATION Page 7 of 9
Operations Summary Report
Legal Well Name: M-24
Common Well Name: M-24A Spud Date: 6/4/1991
Event Name: REENTER+COMPLETE Start: 7/25/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/2/2001 13:00 - 13:30 0.50 CASE P COMP PREP RIG FLOOR TO RUN 2 7/8" LINER.
13:30 - 13:45 0.25 CASE P COMP SAFETY MEETING, REVIEW PROCEDURE AND HAZARDS
OF RUNNING LINER
13:45 - 17:00 3.25 CASE P COMP RUN 2 7/8", STL LINER [54 JTS & 2 PUP JTS]. FILL LINER.
RUN XOAND 15 JTS, 3 3/16" TCII LINER.
17:00 - 17:30 0.50 CASE P COMP HELD WEEKLY SAFETY MEETING WHILE WAITING FOR
BAKER CTLRT.
17:30 - 19:00 1.50 CASE P COMP M/U BAKER DEPLOYMENT SLEEVE AND CTLRT.
CUT OFF DS CTC. M/U BAKER CTC. PULL / PRESS TEST.
19:00-21:00 2.00 CASE P COMP RIH WITH LINER ON CT. ClRCATMIN RATE. TAGTD@
10906 FT. CORRECT TO 10886 FT. 48K# UP, 5K# DN WT.
21:00 - 21:45 0.75 CASE P COMP DROP 5~8" BALL. CIRCULATE TO CTLRT. BALL ON SEAT
@ 45BBLS. SHEARED @ 2400psi. PICK UP WITH 29K# &
CONFIRM LINER RELEASED.
21:45 - 23:30 1.75 CASE P COMP CIRC. WELL TO 2 % KCL WATER. RECOVER FLOPRO FOR
NEXT WELL. ClRC @ 2.7 BPM, 3280 PSI, FULL RETURNS.
CLEAN RIG PITS. MEANWHILE PJU DS CEMENT VAN.
23:30 - 23:45 0.25 CEMT P COMP SAFETY MEETING. REVIEW CEMENT JOB AND SAFETY
CONCERNS.
23:45 - 00:00 0.25 CEMT P COMP BATCH MIX 21 BBLS, 15.8 PPG, G CEMENT SLURRY.
CEMENT AT WT AT 00:00 HRS.
8/3/2001 00:00 - 01:35 1.58 CEMT P COMP PRESSURE TEST CEMENT LINE. STAGE 21 BBLS OF 15.8
PPG CEMENT. PURGE LINE. INSERT DART. PUMP 1 BBL.
DART GONE. DISPLACE CMT AT 3.0 BPM, 2700 PSI, 2.6
BPM RETURNS, DART ON SEAT AT 58.6 BBL, SHEARED
AT 2900 PSI. DISPLACE CMT AROUND LINER AT 3.0 BPM /
2.8 BPM RETURNS, 3600 PSI. 3.4BBLS CMT LOSSES.
LINER WIPER PLUG BUMPED AT 72.2 BBLS. HELD 2000
PSI. FLOATS HELD. STING OUT OF LINER TOP AND JET
TOP OF LINER. CMT IN PLACE AT 01:15 HRS. EXCELLENT
CEMENT JOB.
01:35 - 03:00 1.42 CEMT P COMP POOH WITH BAKER CTLRT.
03:00 - 03:30 0.50 CEMT P COMP LAY OUT BAKER TOOLS.
03:30 - 11:30 8.00 CEMT P COMP TEST BOPE AS PER REGS. WITNESS WAIVED BY
AOGCC.
SENT TEST REPORT TO AOGCC.
11:30 - 11:45 0.25 CEMT P COMP SAFETY MEETING, REVIEW HAZARDS OF RUNNING
MEMORY CNL/GR AND PICKING UP CSH WORKSTRING IN
SINGLES.
11:45 - 12:15 0.50 PERF P COMP M/U MEMORY CNL/GR/CCL. RIH ON CSH WORKSTRING
12:15 - 15:20 3.08 PERF P COMP PICK UP 76 SINGLES OF 1 1/4" CSH WORKSTRING. USE
NEW LITTLE JERK TORQUE TOOL TO M/U CONN.
TORQUE TOOL IS SLOWER TO USE THAN BY HAND. 20
DEGREE STROKE ON TOOL. NO SPINNER.
15:20 - 16:40 1.33 PERF P COMP RIH WITH MEMORY CNL / GR / CCL ON CT.
16:40 - 18:30 1.83 PERF P COMP LOG DOWN FROM 8500 FT AT 30 FPM. ENTERED TOP OF
LINER EASILY.
SAT DOWN WT AT 9250 FT. RIH SLOW JETTING AT 2.0
BPM, 3700 PSI.
JET CONT. CMT FROM 9250 - 9350 FT. CONT LOGGING IN
HOLE AT 30 FPM.
SAT DOWN WT AT 10,690 FT. HARD BOTTOM UNABLE TO
JET DEEPER.
Printed: 8/6/2001 1:38:40 PM
BP EXPLORATION Page 8 of 9
Operations Summa Report
Legal Well Name: M-24
Common Well Name: M-24A Spud Date: 6/4/1991
Event Name: REENTER+COMPLETE Start: 7/25/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/3/2001 18:30 - 19:00 0.50 PERF P COMP PUMP 15 BBL HIGH VIS FLOPRO PILL TO NOZZLE.
19:00 - 20:30 1.50 PERF P COMP Flopro in place, begin up log at 30 fpm.
20:30 - 21:15 0.75 PERF P COMP Stop at 8200' CTD on memory CNL Ioggin run. Paint flag at
8200'. Note, not EOP flag. Stop log, POOH.
21:15 - 21:45 0.50 PERF P COMP Safety meeting prior to standing back CS hydrill work string.
21:45 o 23:15 1.50 PERF P COMP POOH with CS hydril work string.
23:15 - 23:30 0.25 PERF P COMP Safety meeting prior to rigging down SWS memory CNL tool.
23:30 - 23:45 0.25 PERF P COMP Lay down CNL tool.
23:45 - 00:00 0.25 PERF P COMP Standby, waiting on SWS to down load memory tool.
8/4/2001 00:00 - 00:15 0.25 PERF P COMP Waiting on CNL log decision from town.
00:15 - 00:45 0.50 PERF P COMP Pressure test liner lap, Hold 2000 psi at surface.
00:45 - 01:15 0.50 PERF P COMP Liner lap test held like a rock. 2000 psi after 1/2 hour.
Resume waiting on town.
01:15 - 01:30 0.25 PERF P COMP Got word from town that gas is not a problem. Plan to fire
intervals as called in yesterday. Note fill in hole, to 10733' ELM
corrected. Will drop bottom gun and fire rest of lower interval.
Continue to pick up guns into pipe shed.
01:30 - 01:45 0.25 PERF P COMP Dowell hand Daryll Hornbeck twisted knee stepping off of pipe
rack. He indicated that this was his bad knee, but that he could
continue working. He was sent to medic along with Dowell tool
pusher.
01:45 - 02:20 0.58 PERF P COMP Hold safety meeting to review accident. Review deploying
guns, safety joint, etc.
02:20 - 02:40 0.33 PERF P COMP Resume picking up guns into the pipe shed from the SWS
trailor.
02:40 - 04:30 1.83 PERF P COMP Begin running guns. Safety joint made up and ready to go.
04:30 - 05:20 0.83 PERF P COMP Begin running CS hydrill jointed pipe.
05:20 - 05:50 0.50 PERF P COMP Make up injector.
05:50 - 07:30 1.67 PERF P COMP RIH with perforating BHA. Tag PBTD at 10739.5 ft. Correct
depth to
10,733 ft. Pull up and position bottom perf charge at 10,719 ft.
07:30 - 08:20 0.83 PERF P COMP Guns positioned to perf: 10,250 - 10,350 ft. and 10,500 -
10,719 ft.
Close choke, press CT ann. to 2,300 psi. Bleed WHP to zero.
Guns fired.
Good indication.
08:20 - 10:45 2.42 PERF P COMP Pull up hole. Position upper two guns to perf: 9,580 - 9,729.4 ft
and
9,820 - 9,900 ft. Pump 9 bbls high vis FIoPro ahead of 5~8"
ball. Insert ball and displace. Unable to get ball on seat.
Pump second ball, no sign of guns firing. Surge pump rate,
pump max rate. No sign of guns firing.
10:45 - 12:30 1.75 PERF P COMP POOH to check guns. Fill across top of well.
12:30 - 12:45 0.25 PERF P COMP SAFETY MEETING. Review hazards of pulling CSH. Review
previous incident.
12:45 - 13:45 1.00 PERF P COMP Pull 22 stands CSH
13:45 - 14:00 0.25 PERF P COMP SAFETY MEETING. Review hazards of pulling fired guns.
Safety Jt ready.
14:00 - 18:00 4.00 PERF P COMP Lay out SWS 2" perf guns. All shots fired.
18:00 - 18:45 0.75 PERF P COMP Pre tour safety meeting.
18:45 - 19:30 0.75 PERF P COMP Pick up injector to freeze protect well.
19:30 - 20:00 0.50 PERF P COMP RIH to 2000', to FP well.
Printed: 8/6/2001 1:38:40 PM
BP EXPLORATION Page 9 of 9
Operations Summary Report
Legal Well Name: M-24
Common Well Name: M-24A Spud Date: 6/4/1991
Event Name: REENTER+COMPLETE Start: 7/25/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/4/2001 20:00 - 21:30 1.50 PERF N WAIT COMP Standby, waiting on methanol.
21:30 - 21:50 0.33 PERF P COMP Circulate methanl to FP well, follow with KCL.
21:50- 22:15 0.42 PERF P COMP POOH, laying in methanol.
22:15 - 22:00 23.75 PERF P COMP Tag up at surface, begin rigging down injector.
22:00 - 22:30 0.50 PERF P COMP Hold safety meeting. Review status of injured SWS CT
operator. Review neccessity of keeping focused on job,
working safely and without getting in a hurry. Discuss nippling
down, and move to M-03.
22:30 - 00:00 1.50 PERF P COMP Nipple down stack. Rig release at 24:00 8-4-01.
8/5/2001 00:00 - 00:30 0.50 PERF P COMP Continue nippling down stack.
00:30 - 0.00 PERF P COMP Release rig. Standby for well prep to be completed on M-03.
Continue on M-03 DIMS day 1.
Printed: 8/6/2001 1:38:40 PM
03-Sep-01
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well M-24A
Dear Dear SidMadam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
9,000.00' MD
9,020.00' MD
10,886.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
SEP 0 7 2001
Ala~a Oil & Gas Cons, Con~islion
DEFINITIVE
North Slope Alaska
Alaska Drilling & Wells
PBU_ WOA M Pad, Slot M-24
M-24A
Job No. AKMW11129, Surveyed: 2 August, 2001
SURVEY REPORT
31 August, 2001
Your Reh 500292093901
Surface Coordinates: 5974100.99 N, 629017.00 E (70° 20' 14.7876" N, 148° 57' 11.3576" W)
Kelly Bushing: 62.70ft above Mean Sea Level
DRILLING S RV'iC 'S
A Halliburton Company
Survey Ref'. svy10922
North Slope AlaSka
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(fi)
Vertical
Depth
(ft)
9000.00 27.500 141.200 8477.78 8540.48
9020.00 27.430 141.240 8495.53 8558.23
9051.17 20.480 162.520 8524.05 8586.75
9081.57 16.520 199.310 8552.97 8615.67
9113.97 23.390 239.760 8583.54 8646.24
9150.37 32.080 262.540 8615.82 8678.52
9183.77 42.330 274.660 8642.42 8705.12
9210.97 51.770 283.490 8660.95 8723.65
9259.17 67.850 299,830 8685.24 8747.94
9301.57 83.500 310.910 8695.72 , 8758.42
9332.77 90.970 320.050 8697.23 8759.93
9367.37 91.930 334.460 8696.35 8759.05
9396.97 91.670 349.050 8695.42 8758.12
9435.97 91.850 6.100 8694.21 8756.91
9468.77 90.970 18.060 8693.40 8756.10
9503.46 93.830 28.610 8691.94 8754.64
9535.46 95.240 30.190 8689.41 8752.11
9573.26 96.650 34.420 8685.50 8748.20
9603.26 96.480 36.710 8682.07 8744.77
9640.66 95.590 38.480 8678.13 8740.83
9671.88 95.950 40.770 8674.99 8737.69
9701.68 94,450 45.520 8672.29 8734.99
9738.88 92.860 46.230 8669.92 8732.62
9773.88 93.300 54.690 8668.04 8730,74
9816.08 91.010 58.390 8666.45 8729.15
9847.48 91.280 63.670 8665.82 -8728.52
9874.08 92.420 68.780 8664.96 8727.66
9906.88 92.950 72.310 8663.42 8726.12
9937.08 93.300 77.420 8661.78 8724.48
9973.68 94.180 83.060 8659.39 8722.09
Sperry-Sun Drilling Services
Survey Report for M-24A
Your Ref: 500292093901
Job No. AKMW11129, Surveyed: 2 August, 2001
Local Coordinates Global Coordinates
Northings Eastings Northlngs Eastings
(ft) (ft) (ft) (ft)
969.30 S 1722.60 E 5973161.47 N 630756.02 E
976.49 S 1728.37 E 5973154.38 N 630761.92 E
987.32 S 1734.53 E 5973143.66 N 630768.26 E
996.51S 1734.69 E 5973134.47 N 630768.58 E
1004.14 S 1727.57 E 5973126.72 N 630761.59 E
1009.05 S 1711.67 E 5973121.53 N 630745.78 E
1009.29 S 1691.59 E 5973120,95 N 630725.70 E
1006.05 S 1672.01 E 5973123.86 N 630706.07 E
990.35 $ 1633.79 E 5973138.90N 630667.59 E
966.57 S 1600.54E 5973162.10 N 630633.93 E
944.38 S 1578.73 E 5973183.91 N 630611.74 E
915.37 S 1560.07 E 5973212.60 N 630592.59 E
887.34S 1550.63E 5973240.46 N 630582.87 E
848.54 S 1549.19 E 5973279.23 N 630580.56 E
816.54 $ 1556.04E 5973311.35 N 630586.86 E
784.76 S 1569.74E 5973343.36 N 630600.01 E
756.97 S 1585.40 E 5973371,41N 630615.19 E
725.20 S 1605.49 E 5973403.52 N 630634.73 E
700.96 S 1622.82 E 5973428.06 N 630651.64E
671.49 S 1645.51E 5973457.91N 630673.82 E
647.57 S 1665.32 E 5973482.17 N 630693.21 E
625.92 S 1685.61E 5973504.16 N 630713.13 E
600,07 S 1712.26 E 5973530.46 N 630739.33 E
577.84 S 1739.18 E 5973553.15 N 630765.87 E
554.60 S 1774.36 E 5973577.00 N 630800.64 E
539.40 S 1801.81E 5973592.67 N 630827.83E
528.69 S 1826.13 E 5973603.80 N 630851.96 E
517.77S 1857.02 E 5973615.24 N 630882.66 E
509.90 S 1886. i2 E 5973623.61 N 630911.62 E
503.71S 1922.10 E 5973630.42 N 630947.48 E
DEFINIT VE
Alaska Drilling & Wells
PBU_WOA M Pad
Dogleg Vertical
Rate Section
(°/100fi)
1007.16
0.362 1008.57
35.256 1008.48
39.789 1004.04
46.356 994.05
Comment
Tie On Point
MWD Magnetic
Window Point
37.287 977.83
37.605 960.31
42.000 944.98
44.257 919.73
44.705 902.82
37.792 895.03
41.726 893.38
49.274 899.39
43.700 917.37
36.551 939.30
31.481 967.06
6.606 994.51
11.738 1027.79
7.604 1054.93
5.274 1089.31
7.388 1118.43
16.652 1146.82
4.679 1182.82
24.169 1217.26
10.305 1259.34
16.834 1290.72
19.673 1317.14
10.871 1349.34
16.935 1378.48
15.564 1412.73
31 August, 2001 - 14:30 Page 2 of 4 DrillQuest 2,00.08,005
Sperry-Sun Drilling Services
Survey Report for M-24A
Your Ref: 500292093901
Job No. AKMW11129, Surveyed: 2 August, 2001
North Slope Alaska
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(fi)
Vertical
Depth
(ft)
10006.28 93.740 85.350 8657.14 8719.84
10046.88 93.740 92.040 8654.49 8717.19
10077.68 92.250 95.750 8652.88 8715.58
10110.28 91.370 103.850 8651.84 8714.54
10144.08 92.780 107.380 8650.62 8713.32
10179.48 92.250 111.600 8649.07 8711.77
10212.28 90.840 116.010 8648.18 8710.88
10243.88 90.840 112.660 8647.72 8710.42
10273.88 91.370 109.490 8647.14 8709.84
10307.08 91.280 104.730 8646.37 8709.07
10340.28 89.520 101.210 8646.14 8708.84
10372.48 88.810 97.330 8646.61 8709.31
10404.48 89.070 95.750 8647.20 8709.90
10438.48 89.870 98.740 8647.51 8710.21
10469.88 88,990 103.670 8647.83 8710.53
10512.68 88.110 109.140 8648.91 8711.61
10543.48 89.520 113,010 8649.55 8712.25
10579.48 92.250 117.600 8648.99 8711.69
10605.48 88.900 116.360 8648.73 8711.43
10635.08 85.020 115.660 8650.30 8713.00
10666.08 80.700 114.070 8654.15 8716.85
10708.68 74.980 111.780 8663.12 8725.82
10743.88 71.890 109.140 8673.16 8735.86
10774.08 68.110 108.960 8683.49 8746.19
10803.88 64.320 108,260 8695.50 8758.20
10834.08 60.440 106.320 8709.50 8772.20
10851.88 58.500 105.790 8718.54 -8781.24
10886.00 58.500 105.790 8736.37 8799.07
Local Coordinates : Global Coordinates
Northings Eastlngs ' Northings Eastings
(ft) (ft) (ft) (ft)
500.43 S 1954.45E 5973634.26 N 630979.77 E
499.51S 1994.93E 5973635.88 N 631020.23 E
501.60 $ 2025.61 E 5973634.32 N 631050.94 E
507.14 S 2057.70 E 5973629.33N 631083.12 E
516.23 $ 2090.22 E 5973620.80 N 631115.79 E
528.03S 2123.55 E 5973609.58 N 631149.32 E
541.26 S 2153.54 E 5973596.86 N 631179.54 E
554.28 S 2182.33E 5973584.34N 631208.54 E
565.06 S 2210.31 E 5973574.04 N 631236.71E
574.82 S 2242.03 E 5973564.83 N 631268.58 E
582.27 S 2274.37 E 5973557,93 N 631301.05 E
587.46 S 2306.14 E 5973553.30 N 631332.91 E
591.10 S 2337.93 E 5973550.20 N 631364.75 E
595.39 S 2371.65E 5973546.49 N 631398.54 E
601.49 S 2402.44E 5973540.92 N 631429.43E
613.57 S 2443.47 E 5973529.55 N 631470.66 E
624.64 S 2472.20 E 5973518.98 N 631499.58 E
640.02 S 2504.73 E 5973504.16 N 631532.37 E
651.81 S 2527.89 E 5973492.77 N 631555.73 E
664.77 S 2554.45 E 5973480.27 N 631582.51 E
677.70 S 2582.35 E 5973467.82 N 631610.63 E
693.92 S 2620.68 E 5973452.26 N 631649,23 E
705.72 S 2652.28 E 5973441.01 N 631681.03 E
714.98 S 2679.10 E 5973432.21 N 631708.01 E
723.69 S 2704.94 E 5973423.95 N 631733.99 E
731.64 S 2730.48 E 5973416.43 N 631759.67 E
735.88 S 2745.22 E 5973412.45 N 631774.47 E
743.80 S 2773.21 E 5973405.01 N 631802.60 E
Dogleg
Rate
(°/100ft)
7.137
16.443
12.965
24.980
11,239
12.003
14.111
10.600
10.711
14.336
11.853
12.248
5.003
9.103
15.948
12.941
13.370
14.832
13.739
13.319
14.835
14.418
11.346
12.529
12.898
14.051
11.197
0.000
Alaska Drilling & Wells
PBU_WOA M Pad
Vertical
Section Comment
1442.39
1477.91
15o3.43
1528.45
1552.o7
1575.04
1594.39
1612.81
1631.66
1654.24
1678.53
1703.45
1729.15
1756.21
1779.83
1809.32
1828.67
1849.15
1863.31
1879.83
1897.53
1922.62
1944.09
1962.68
1980.71
1998.84
2009.48
2029.77
Projected To TD
31 August, 2001 - 14:30
Page 3 of 4
DrillQuest 2. 00. 08. 005
Sperry-Sun Drilling Services
Survey Report for M-24A
Your Reft 500292093901
Job No. AKMW11129, Surveyed: 2 August, 2001
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA M Pad
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 26.458° (22-Aug-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is-from Well Reference and calculated along an Azimuth of 60.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 10886.00ft.,
The Bottom Hole Displacement is 2871.22ft., in the Direction of 105.014° (True).
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (fi) (ft) (ft)
go00.O0 8540.48 969.30 S 1722.60 E
9020.00 8558.23 976.49 S 1728.37 E
10886.00 8799.07 743.80 S 2773.21 E
Comment
Tie On Point
Window Point
Projected To TD
Survey tool program for M-24A
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(fi) (ft) (ft) (ft)
0.00 0.00 9000.00 8540.48
9000.00 8540.48 10886.00 8799.07
Survey Tool Description
AK-1 BP_HG - BP High Accuracy Gyro (M-24)
MWD Magnetic (M-24A)
31 August, 2001 - 14:30
Page 4 of 4
DrillQuest 2.00.08.005
ALASKA 01~~ GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. 7TM AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
John Cubbon
CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage AK 99519-6612
Re:
Prudhoe Bay Unit M-24A
BP Exploration (Alaska) Inc.
Permit No: 201-126
Sur Loc: 2269' SNL, 195' EWL, SEC. 06, T1 IN, R13E, UM
Btmhole Loc. 2868' SNL, 2756' EWL, SEC. 06, T1 IN, R13E, UM
Dear Mr. Cubbon:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting determinations are made.
Annular disposal has. not been requested as part of the Permit to Drill application for Prudhoe
Bay Unit M-24A.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Commissioner
BY ORDER OFI~IE COMMISSION
DATED thiS~_~day of July, 2001
jjc/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
/{'" STATE OF ALASKA i'"
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
I [] Exploratory [] Stratigraphic Test [] Development Oil
la. Type of work [][] Re-EntryDrill [][] ReddllDeepen lb. Type of well[] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 62.70' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028282
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 2O AAC 25.025)
2269' SNL, 195' EWL, SEC. 06, T11N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
3290' SNL, 1959' EWL, SEC. 06, T11N, R13E, UM M-24A Number 2S100302630-277
At total depth 9. Approximate spud date
2868' SNL, 2756' EWL, SEC. 06, T11N, R13E, UM 08/01/01 Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028260, 2756' MDI No Close Approach 2560 10696' MD / 8689' TVDss
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 9020' MD Maximum Hole Angle 100 ° Maximum surface 2256 psig, At total depth (TVD) 8800' / 3320 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casin,q Wei,qht Grade Couplin,q Len,qth MD TVD MD TVD (include sta,qe data)
3-3/4" 3-1/2,,x2-7/8, 9.3#/6.2# L-80 ST-L 2056' 8640' 8159' 10696' 8689' B4 cu ft Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations. - - -'- c u u I
Present well condition summary Alaska Oil & Gas Cons. Commission
Total depth: measured 9833 feet Plugs (measured)
Anchorage
true vertical 9284 feet
Effective depth: measured 9622 feet Junk (measured) 1-1/4" OD x 5' length of weight bar (12/87)
true vertical 9095 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 80' 30" x 20" 8 cu yds Concrete 110' 110'
Surface 2620' 13-3/8" 3746 cuft Arcticset III and II 2683' 2683'
Intermediate 8924' 9-5/8" 2004 cu ft Class 'G' 8987' 8529'
Production
Liner 1123' 7" 315 cu ft Class 'G', 133 cu ft PF 8710' - 9833' 8283' - 9284'
Liner 1008' 5" 150 cu ft Class 'G' 8659' - 9667' 8238' - 9135'
Perforation depth: measured Open: 9157' - 9192'
Sqzd: 9192' - 9497'
true vertical Open: 8680' - 8711'
Sqzd: 8711' - 8984'
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: John Cubbon, 564-4158 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the for~gRir~iC'~r~e and correct to the best of my knowledge ,
Signed JohnCubbon //~.(~ Title CT DrillingEngineer Date
;ii' i: ,'i' '"" ';,:,'l","': '; 1',., ,' :' ',':i ; '.',' :1. 'i, ~!~?, ' ........ !,', ..... ,:' "'; I',i ', .2'!' ,'i:: ';i., ! ','[',,[ '!':"1 ~'~','~..',,~.~;,~.~,~,~ ~,~ I~..~,!~ .',,. ', I. I 'i'Z 2" .: i, 2; ,' J "'; i'" ,l:'i ,I.,'2 ' ,i,,'..: .! I'. I'., .F. ,'i', ':Zi:F, ,' ',. ~. ',,;, ~ ',; .....
Permit Number V I APl Number I App r°'~I ~)~1/~( See cover letter
.~?- ,,,".~_.~ 50- 029-20939-01 for other requirements
Conditions of Approval: Samples Required [] Yes ~ No Mud Log ReqL/ired ' - [] Yes j~ No
Hydrogen Sulfide Measures J~ Yes [] No Directional Survey Required ]C~ Yes [] No
Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K l~3.5K psi for CTU
.,,oproved Copy.
Other: Returrled by order of //2--/~ /
.Approved By . .- , -,-' , ,. i . , . Co. rnmissioner the commission Date
Form 10-401 Rev. 12-01-85
Submit In T/riplicate
BPX
M-24A Sidetrack
,~,~l'Summary of Operations:
A CTD sidetrack of well M-24A will be drilled. Specific prep work, (Phase 1) and drilling, (Phase 2)
operations are detailed below.
Phase 1: Isolate & integrity test inner annulus, (IA). Drift tubing and tag PBTD in liner, abandon
current perforations and set cement plug for kickoff. Mill window if service coil is available.
Planned for July 15, 2001
· Drift well and tag PBTD.
· Integrity test IA after displacing to seawater. Dummy gas lift valves are already in place.
· P&A the existing perforations at 9157'-9192' MD with cement.
· Spot a cement plug from PBTD to the kickoff point at 9020' MD.
· Mill window with service coil if available.
hase 2: Drill and Complete CTD sidetrack: Planned for August 1, 2001
2-3/8" coil will be used to drill a -1700 foot, 3-%" open hole sidetrack, (as per attached plan) and run a
solid, cemented & perforated 3-1/2" x 2-7/8" liner completion.
Mud Program: · Phase 1: Seawater
· Phase 2: Seawater and rio-Pro (8.6- 8.7 ppg)
Disposal: · No annular injection on this well.
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program:
· 3-1/2", L-80, solid liner will be run from 8640'md (TOL, 8159' TVDss) to approx. 9080'md and then
crossed over to 2- 7/8", L-80, solid liner to TD at approx 10,696'md. Liner will be cemented in place
with approximately 15 bbls (annular volume plus 25% excess in OH) of 15.8ppg class G cement.
Well Control: · BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2200 psi.
Directional
· See attached directional plan. Maximum hole angle is 99.7 deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging · An MWD Gamma Ray log will be run over the open hole section.
· Real time resistivity may be run in the OH, if not, a memory resistivity log will be run after reaching TD.
Hazards
· H2S was measured at 80 ppm on May 9, 2001 at M-24. The highest. H2S concentration measured to
date on "M" pad is 120 ppm on July 11,2000.
· The well-path will cross 2 mapped faults. There is the risk of lost circulation along the proposed well-
path.
Reservoir Pressure
Res. press, is estimated to be 3320 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface
is 2256 psi.
TREE = 6" McEVOY
WELLHEAD= McEVOY
A CTUA TOR= OTIS
KB. ELEV ~ ~;~'i'~7'i
'~-F'~'~I"~-~--~- ............................... 27.32'
KOP =
-~-~'i~---- ..........................................
Datum MD = 9361'
.,
M-24A
PROPOSED CTD SIDETRACK
Safety Note: 13 Chrome Tubing.
13 Chrome5" Scab Liner
2005' I'"~ 5-1/2" CA MCO SSSV LAND. NIP, ID:4.562"
13-3/8" CSG, 72#, L-80, ID: 12.347" Id 2682'
Minimum ID = 4.455" @ 8649'
5-1/2" OTIS XN NIPPLE
GAS LIFT MANDRELS
M~ I~vo I ~v I~ I v,v I,~CH I
3051'1 29s6'I 1 I OT~ 11-1/2"1 ~ I
5698'I 5539'I 27 I OTIS 11-1/2"1 RA I
6898'1 ~346'1 26 I OTiS 11-1/2"1 RA I
6299'17861] 30 I OT,S 11-1/2"1 RA I
118564'18092'I 30 I OTIS 11-1/2"1 RA I
Top of Proposed 3-1/2" Liner Id 8640'
5-1/2"TBG, 17#, NT13CR-80, 0.0232bpf, ID:4.892" Id 8664'
sso.' Id
5-1/2" OTIS X NIP, ID: 4.562"
9-5/8" x 5-1/2" TIW HBBP PKR, ID = 4.75"
5-1/2" OTIS X NIP, ID = 4.562"
5-1/2" OTIS XN NIP, ID = 4.455"
TOPOF 5" LNR Id 8659'
TOPOF7" LNR Id 8710'
9-5/8" CSG, 47#, L-80, ID = 8.681" Id 8987'
Mill Window off Cement KOP
PERFORATION SUMMARY
REF LOG: GEARHART BHCS #2 on 5/23/83
ANGLEATTOPPERF: 27 @ 9157'
Note: Refer to Production DB for historical perf data
3-3/8"I 6 I 9157-9192 O I 06/20/91I
8647' ]~ 5-1/2" DUMMY SEAL ASSY W/MULESHOE I
8647' I~ ELL 'I-r' LOGGED 6/18/911
15.8 ppg CementI
~0s0' I-~
..:..:... .~: · .!.:..'?..: :.:.
3-1/2" to 2-7/8" XO I
I3-3/4" Open Hole
2-7/8" STL L-80 Liner, Cemented & Perforated
I ~wo~ Id 9622'
l 5" LNR, 18#, NT13CR-80, 0.0177 bpf, ID:4.276" I--1' 9667'
I ~D Id 9722'
7"LNR, 29#, NT13CR-80, 0.0371 bpf, IO=6.184" Id 9833'
P&A'd w/17 Cement
9636' J-1
0 ~f~
FISH - 1-1/4" OD X 5' LENGTH WEIGHT BAR I
I
LOST 12-27-87
DATE REV BY COMMENTS DATE REV BY COMMENTS
5/27/1983 ORIGINAL COMPLETION
6/14/1991 RIG WORKOVER
"03/14/01 SIS-MD FINAL
04/17/01 RN/tlh Corrections
04/26/01 pcr M-24A ST Proposal
PRUDHOE BAY UNIT
WELL: M-24A Proposed ST
PERMIT No: 83-0570
AP1 No: 50-029-20939-01
Sec. 6, T11 N, R13E
BP Exploration (Alas ka)
~:-; - ----M-24 (M-24)
BP Amoco ~ ~":':' PianPla~M-24A ~M Magne,c No~: 26.54' Creat~ B~ Bdj Potnis Date: 5,4,2001
bp
MagneUc Field Contact ]nfor~na~k~r.:
~LLPA~ O~LS ~' ~- Sffeng~: 57465nT
~:/-~: Dip ~gle: 80.77~ Direct {907) 2~7-6~1'~
Date: 5/4/2001
~'"~'~ ~o ~ Model: BGGM2~ 8a~er Hughes INTEO. (907) 267-6600
V~m Off b 0 Im
R~FERE. CE,NFO~T,O~ -- -30~q ............ ; ............; .....:'"' ............................................................ :'" ¢'" '~'""~ .................... ~ .......... ; ............. :" "'~ ......................
C~ordi~te (~) Refe~n~: Well ~n~: ~24, T~ No~
S~on ~S) Referent: Slot - 24 (0.00N,0.~E)
M~u~ ~p~ Referee: 39: 24 5/10/1~ ~:~ 62.70
sE~n
70~S l~SS HsL~ -59Lll 2~1.~ 1~ 1~00 191~
I
................ .... 1' 7- .:. _ ............... ...... 1
q-.~ .. -.-.: ; . · ?..::~. ~ ~
-i' ..... . .... ~ ~ _ - ....... ;....-h ~ -1000 ..................... t ...... '/ ...... ' ......... ~- ---'---~ ................... ~ .......................................... ~ .............. ~ ........... ~ ...... ~ -
~ ' . ' - ' -1050--":: ~ ~ .............. '-.' '- ~ ~ - ---: - - ~ f ~- -~ * i-. ; · · ·
~ ; ~ . ~ ~ - ; % .- : /~ : . ~ : , ; - :
~ ........ ~--' : ~.-~. ~ 1450 1500 15~ 1600 1650 1700 1750 18~ 1850 1900 1950 2000 2050 2100 2150 2200 2250 2300 2350 2400 2450 2500 2550 2600 2650 27~00 2750
~ - ~: ::- -~ ; ; ~ ~ West(-)/east(+l[50~in]
::t'; .'...;"..!. ~ '.".'.'.. '~ ~ - ; '"'...':'.:." /. ~- ~ ..... : ."."'.:." ?'"'. ......... ":' .; · - . - . ' ; ; :
OOOU"EE}'"': f ...... : .... ~ ~ - ' ..... ; ' ~ ~ ...... i ...... _; ......... ~.:L...;:_~z::z....: ::..": .~. :.. :.....~..L:..~..:..;.....:..:..L:.L~L:::_.:. ' ;.Z;'" ~ ...... : ............. : ..... : ....... ~ '
:.~ ..... L....t~ /}.J ... 2,----~--'"-:-'-~"---7'.1~;[;~.7.~.;'t..~ ; '%: ; ' :' ~ i :; / ;: ..... ;'-4 ' : ~ ; ' : . '
~,~--:;~..'.' ....... _~.__...._.._.~.?;~ - .-:~.::~-._...~.-. ~ _~_~ ..... ..._~:..-.----:.-..-.F.:. ~..~;;'.'/.:..::.:;..:..:{:~:_ ... :.'..";.. _..'_'_':_.'___-. '~:;..::::..~-....::'::..:..'..: .:?.:..:;...'..::... ; ; ,
-i : ; ....... ' · ~ - -' ....... ~ .... i ..... ~-.--.-h-.',- :-.; : :. ' .............. ~ .................... ~ ; ;
88~-~...: ....... ; ...... ~ ...... ~ ' · ...... ;.-.-'~'- ~ ...; ............. i .... ..; ~;;'~ :': ...... ,.'.:.'.. .... ; :. . ~ ~;:.;. ; ~ - - ; ', .
~--'~ - .--. .. . :.'....'..;.'.'::.'. .- --: -: '.-! .. ~. __ ~ ~_.;.....::._..:.....;:.:._.._'-'-~ ...... : ~ ~. -~.:.-,..:....?..-.:......;.;-..~L...;.L;;i.L';..";:'¢;~ ,':; ; :: .-- ~_ ~ :.?.._.; ......~.- ....:.. ~ .... .,.. : :. :
~'T'}"rT'F'Tr'T'~ 'r'~ ~ FF%F¥'r'T'r'} . . ' ~ ' : *~' FF'~"~'TT'~"r'5'T'F~-~-rTT~: ~T'~-r'?T'F'~'¥'¥'~"r'7":"~'~¥'T'r ~"~"~":"F ~ ~'~ '~ ~'~ '~-~' ~ ¥ ¥'Fi '*-[?~'~q'T'~T .r.~Tr~?F~?1~rTTT~.~?¥-.?.~.~..Fr.7.F¥.7"~~7TTT.7.¥T.~.~..r.7.¥.~.:..7..:.T.:..~.i ...... ~ '-" ........................
750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000 2050 2100 2150 2200 2250 2300 2350 2400 2450 2500 2550 2600 2650 2700
Vertical Section at 60.00° [5Oft/in]
5/4/200! 2:25 PM
Obp
BP Amoco
Baker Hughes INTEQ Planning Report
I,NTEQ
Company: BP Amoco
Field: Prudhoe Bay
Site: PB M Pad
Well: M-24
Wellpath: Plarg¢6 M-24A
Date: 5/4/2001 Time: 13:51:05 Page: 1
Co-ordinate(NE) Reference: Well: M-24, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,0.00E,60.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2000
Site: PB M Pad
TR-11-12
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5971246.37 ft Latitude: 70 19 47.175 N
626262.80 ft Longitude: 148 58 33.196 W
North Reference: True
Grid Convergence: 0.96 deg
Well: M-24 Slot Name: 24
M-24
Well Position: +N/-S 2808.09 ft Northing: 5974100.99 ft Latitude: 70 20 14.788 N
+E/-W 2802.08 ft Easting: 629017.00 ft Longitude: 148 57 11.358 W
Position Uncertainty: 0.00 ft
Wellpath: Plan#6 M-24A Drilled From: M-24
500292093901 Tie-on Depth: 9020.00 ft
Current Datum: 39: 24 5/10/1983 00:00 Height 62.70 ft Above System Datum: Mean Sea Level
Magnetic Data: 5/4/2001 Declination: 26.54 deg
Field Strength: 57465 nT Mag Dip Angle: 80.77 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
0.00 0.00 0.00 60.00
Plan: Plan #6 Date Composed: 5/4/2001
Identical to Lamar's Plan #6 Version: 1
Principal: Yes Tied-to: From: Definitive Path
Targets
· "' ' Map · Map '.' <--. LatitUde :'---->' <-- Longitude -->
Name.· Description TVD +N/-S "+E/-Wi Northing Easting Deg Min Sec Deg Min Sec'
· .. ft ft ft ft' ft
M-24A Polygon6.1 0.00 -637.35 1557.63 5973490.59 630585.23 70 20 8.518 N 148 56 25.869 W
-Polygon 1 0.00 -637.35 1557.63 5973490.59 630585.23 70 20 8.518 N 148 56 25.869 W
-Polygon 2 0.00 -505.30 1734.89 5973625.66 630760.18 70 20 9.816 N 148 56 20.692 W
-Polygon 3 0.00 -435.19 2026.14 5973700.76 631050.15 70 20 10.505 N 148 56 12.185 W
-Polygon 4 0.00 -520.23 2324.77 5973620.88 631350.18 70 20 9.668 N 148 56 3.465 W
-Polygon 5 0.00 -563.26 2504.09 5973580.94 631530.20 70 20 9.244 N 148 55 58.228 W
-Polygon 6 0.00 -566.04 2669.08 5973581.00 631695.20 70 20 9.216 N 148 55 53.410 W
-Polygon 7 0.00 -771.03 2665.63 5973376.00 631695.28 70 20 7.200 N 148 55 53.513 W
-Polygon 8 0.00 -510.19 2024.87 5973625.76 631050.18 70 20 9.767 N 148 56 12.223 W
-Polygon 9 0.00 -566.65 1813.88 5973565.68 630840.20 70 20 9.212 N 148 56 18.385 W
-Polygon 10 0.00 -787.14 1840.17 5973345.69 630870.28 70 20 7.044 N 148 56 17.619 W
M-24A T6.3@TD 8650.00 -643.59 2522.74 5973500.95 631550.23 70 20 8.454 N 148 55 57.684 W
M-24A T6.1 8655.00 -471.48 1805.47 5973660.68 630830.17 70 20 10.148 N 148 56 18.630 W
M-24A T6.2 8655.00 -517.71 2174.78 5973620.82 631200.18 70 20 9.693 N 148 56 7.845 W
Annotation
: .
MD TVD
ff ff.
9000.00 8477.78 TIP
9020.00 8495.53 KOP
9220.00 8672.40 1
9351.85 8716.51 2
9556.85 8696.19 3
Obp
,.
BP Amoco
Baker Hughes INTEQ Planning Report
Company: BP Amoco
Field: Prudhoe Bay
Site: PB M Pad
Well: M-24
Wellpath: Plar~ M-24A
Date: 5/4/2001 Time: 13:51:05 Page: 2
Co-ordinate(NE) Reference: Well: M-24, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,0.00E,60.00Azi)
Sum/ey Calculation Method: Minimum Curvature Db: Oracle
Annotation
MD TVD
ff
10002.14 8656.72 4
10402.14 8656.69 5
10502.14 8656.69 6
10696.37 8689.30 TD
Plan Section Information
MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg
9000.00 27.50 141.20 8477.78 -969.18 1722.73 0.00 0.00 0.00 0.00
9020.00 27.43 141.24 8495.53 -976.37 1728.51 0.36 -0.35 0.20 165.25
9220.00 51.09 283.09 8672.40 -997.73 1673.73 37.00 11.83 70.93 150.00
9351.85 90.00 315.23 8716.51 -935.50 1571.05 37.00 29.51 24.37 45.00
9556.85 99.69 30.87 8696.19 -747.76 1547.09 37.00 4.73 36.90 80.00
10002.14 90.00 74.55 8656.69 -486.78 1891.81 10.00 -2.18 9.81 100.00
10402.14 90.00 114.55 8656.69 -517.84 2282.51 10.00 0.00 10.00 90.00
10502.14 90.00 104.55 8656.69 -551.26 2376.62 10.00 0.00 -10.00 270.00
10696.37 70.58 104.55 8689.30 -599.11 2561.05 10.00 -10.00 0.00 180.00
Survey
MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ft'.. deg deg ft ft ft ff ft deg/100ft ft deg..
9000.00 27.50 141.20 8477.78 -969.18 1722.73 5973161.67 630756.01 0.00 1007.34 0.00 TIP
9020.00 27.43 141.24 8495:53 -976.37 1728.51 5973154.58 630761.91 0.36 1008.75 165.25 KOP
9025.00 25.84 143.36 8500.00 -978.14 1729.88 5973152.83 630763.31 37.00 1009.05 150.00 BLIND
9050.00 18.60 158.81 8523.15 -986.25 1734.58 5973144.81 630768.15 37.00 1009.07 148.10 BLIND
9075.00 13.85 187.81 8547.18 -992.95 1735.62 5973138.13 630769.30 37.00 1006.62 133.76 BLIND
9100.00 14.35 226.41 8571.48 -998.06 1732.97 5973132.97 630766.74 37.00 1001.76 105.85 BLIND
9125.00 19.70 252.72 8595.41 -1001.45 1726.68 5973129.47 630760,51 37.00 994.63 68.33 BLIND
9150.00 27.17 266.64 8618.35 -1003.04 1716.94 5973127.71 630750.80 37.00 985.39 43.11 BLIND
9175.00 35.44 274.68 8639.70 -1002.79 1703.99 5973127.75 630737.85 37.00 974.31 30.30 BLIND
9188.01 39.89 277.66 8650.00 -1001.92 1696.10 5973128.48 630729.94 37.00 967.90 23.41 M-24A
9194.64 42.19 278.97 8655.00 -1001.29 1691.79 5973129.03 630725.63 37.00 964.49 21.05 M-24A
9200.00 44.06 279.95 8658.91 -1000.69 1688.18 5973129.57 630722.00 37.00 961.66 20.06 BLIND
9220.00 51.09 283.09 8672.40 -997.73 1673.73 5973132.28 630707.51 37.01 950.63 19.33 1
9225.00 52.41 284.74 8675.50 -996.79 1669.92 5973133.16 630703.68 37.00 947.80 45.00 BLIND
9250.00 59.31 292.20 8689.53 -990.19 1650.35 5973139.42 630684.00 37.00 934.15 43.98 BLIND
9275.00 66.57 298.63 8700.91 -980.61 1630.28 5973148.65 630663.78 37.00 921.56 39.78 BLIND
9300.00 74.08 304.39 8709.32 -968.30 1610.25 5973160.62 630643.54 37.00 910.37 36.84 BLIND
9325.00 81.72 309.72 8714.56 -953.57 1590.78 5973175.00 630623.81 37.00 900.87 34.90 BLIND
9350.00 89.43 314.85 8716.49 -936.82 1572.36 5973191.44 630605.11 37.00 893.29 33.78 BLIND
9351.85 90.00 315.23 8716.51 -935.50 1571.05 5973192.73 630603.78 37.03 892.82 33.88 2
9375.00 91.48 323.67 8716.21 -917.93 1556.01 5973210.04 630588.45 37.00 888.58 80.00 BLIND
9400.00 93.05 332.79 8715.22 -896.71 1542.88 5973231.02 630574.95 37.00 887.81 80.11 BLIND
9425.00 94.53 341.94 8713.57 -873.72 1533.28 5973253.85 630564.96 37.00 891.01 80.47 BLIND
9450.00 95.90 351.13 8711.29 -849.53 1527.49 5973277.93 630558.75 37.00 898.08 81.08 BLIND
9475.00 97.12 0.36 8708.45 -824.79 1525.65 5973302.64 630556.48 37.00 908.85 81.91 BLIND
9500.00 98.16 9.63 8705.11 -800.13 1527.80 5973327.32 630558.21 37.00 923.05 82.96 BLIND
9525.00 98.98 18.95 8701.38 -776.20 1533.89 5973351.35 630563.89 37.00 940.29 84.20 BLIND
9550.00 99.57 28.30 8697.34 -753.63 1543.77 5973374.10 630573.38 37.00 960.13 85.59 BLIND
9556.85 99.69 30.87 8696.19 -747.76 1547.09 5973380.02 630576.60 36.99 965.94 87.18 3
9575.00 99.37 32.68 8693.18 -732.54 1556.52 5973395.39 630585.76 10.00 981.71 100.00 BLIND
9600.00 98.91 35.17 8689.21 ~712.07 1570.29 5973416.10 630599.18 10.00 1003.88 100.30 BLIND
9625.00 98.44 37.65 8685.44 -692.18 1584.96 5973436.24 630613.50 10.00 1026.53 100.70 BLIND
9650.00 97.95 40.13 8681.87 -672.92 1600.50 5973455.76 630628.70 10.00 1049.61 101.07 BLIND
9675.00 97.45 42.60 8678.52 -654.33 1616.87 5973474.63 630644.75 10.00 1073.08 101.42 BLIND
BP Amoco
Baker Hughes INTEQ Planning Report
i_NTEQ
Company: BP Amoco Date: 5/4/2001 Time: 13:51:05 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: M-24, True North
Site: PB M Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: M-24 Section (VS) Reference: Well (0.00N,0.00E,60.00Azi)
Wellpath: Plan#6 M-24A Sur~ey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ff deg deg ft ff ft ft ft deg/100ft ft deg
9700.00 96.94 45.07 8675.39 -636.44 1634.04 5973492.81 630661.62 10.00 1096.90 101.76 BLIND
9725.00 96.41 47.53 8672.49 -619.29 1651.99 5973510.26 630679.27 10.00 1121.03 102.06 BLIND
9750.00 95.87 49.98 8669.81 -602.90 1670.68 5973526.97 630697.67 10.00 1145.40 102.35 BLIND
9775.00 95.32 52.43 8667.38 -587.32 1690.08 5973542.88 630716.79 10.00 1169.99 102.61 BLIND
9800.00 94.76 54.88 8665.18 -572.56 1710.13 5973557.98 630736.59 10.00 1194.74 102.85 BLIND
9825.00 94.19 57.32 8663.23 -558.66 1730.82 5973572.23 630757.03 10.00 1219.60 103.07 BLIND
9850.00 93.61 59.76 8661.53 -545.64 1752.09 5973585.61 630778.08 10.00 1244.54 103.26 BLIND
9875.00 93.03 62.20 8660.08 -533.54 1773.92 5973598.09 630799.69 10.00 1269.49 103.42 BLIND
9900.00 92.44 64.63 8658.89 -522.36 1796.25 5973609.65 630821.82 10.00 1294.41 103.56 BLIND
9925.00 91.84 67.06 8657.96 -512.14 1819.04 5973620.26 630844.43 10.00 1319.26 103.68 BLIND
9950.00 91.25 69.49 8657.28 -502.89 1842.25 5973629.91 630867.48 10.00 1343.99 103.77 BLIND
9975.00 90.65 71.91 8656.87 -494.63 1865.84 5973638.58 630890.92 10.00 1368.55 103.81 BLIND
10000.00 90.05 74.34 8656.72 -487.37 1889.76 5973646.24 630914.71 10.00 1392.90 103.85 BLIND
10002.14 90.00 74.55 8656.69 -486.78 1891.81 5973646.87 630916.75 10.00 1394.97 103.86 4
10025.00 90.00 76.84 8656.69 -481.13 1913.96 5973652.90 630938.80 10.00 1416.97 90.00 BLIND
10050.00 90.00 79.34 8656.69 -475.97 1938.42 5973658.48 630963.16 10.00 1440.73 90.00 BLIND
10075.00 90.00 81.84 8656.69 -471.88 1963.08 5973662.99 630987.75 10.00 1464.14 90.00 BLIND
10100.00 90.00 84.34 8656.69 -468.87 1987.90 5973666.42 631012.50 10.00 1487.13 90.00 BLIND
10125.00 90.00 86.84 8656.69 -466.95 2012.82 5973668.78 631037.39 10.00 1509.68 90.00 BLIND
10150.00 90.00 89.34 8656.69 -466.11 2037.80 5973670.04 631062.35 10.00 1531.73 90.00 BLIND
10175.00 90.00 91.84 8656.69 -466.37 2062.80 5973670.22 631087.35 10.00 1553.25 90.00 BLIND
10200.00 90.00 94.34 8656.69 -467.72 2087.76 5973669.30 631112.33 10.00 1574.20 90.00 BLIND
10225.00 90.00 96.84 8656.69 -470.15 2112.64 5973667.29 631137.24 10.00 1594.53 90.00 BLIND
10250.00 90.00 99.34 8656.69 -473.66 2137.39 5973664.21 631162.05 10.00 1614.20 90.00 BLIND
10275.00 90.00 101.84 8656.69 -478.26 2161.96 5973660.04 631186.69 10.00 1633.19 90.00 BLIND
10300.00 90.00 104.34 8656.69 -483.92 2186.31 5973654.80 631211.13 10.00 1651.44 90.00 BLIND
10325.00 90.00 106.84 8656.69 -490.63 2210.39 5973648.50 631235.32 10.00 1668.94 90.00 BLIND
10350.00 90.00 109.34 8656.69 -498.39 2234.15 5973641.15 631259.21 10.00 1685.64 90.00 BLIND
10375.00 90.00 111.84 8656.69 -507.18 2257.56 5973632.76 631282.76 10.00 1701.51 90.00 BLIND
10400.00 90.00 114.34 8656.69 -516.99 2280.55 5973623.36 631305.92 10.00 1716.52 90.00 BLIND
10402.14 90.00 114.55 8656.69 -517.84 2282.51 5973622.54 631307.89 10.00 1717.79 90.00 5
10425.00 90.00 112.26 8656.69 -526.92 2303.49 5973613.82 631329.02 10.00 1731.42 270.00 BLIND
10450.00 90.00 109.76 8656.69 -535.88 2326.82 5973605.26 631352.51 10.00 1747.15 270.00 BLIND
10475.00 90.00 107.26 8656.69 -543.82 2350.53 5973597.73 631376.34 10.00 1763.70 270.00 BLIND
10500.00 90.00 104.76 8656.69 -550.72 2374.56 5973591.25 631400.48 10.00 1781.07 270.00 BLIND
10502.14 90.00 104.55 8656.69 -551.26 2376.62 5973590.74 631402.56 10.00 1782.58 270.00 6
10525.00 87.71 104.55 8657.15 -557.00 2398.74 5973585.38 631424.77 10.00 ' 1798.87 180.00 BLIND
10550.00 85.21 104.55 8658.69 -563.27 2422.89 5973579.53 631449.02 10.00 1816.65 180.00 BLIND
10575.00 82.71 104.55 8661.32 -569.51 2446.95 5973573.70 631473.19 10.00 1834.37 180.00 BLIND
10600.00 80.21 104.55 8665.03 -575.73 2470.88 5973567.91 631497.22 10.00 1851.98 180.00 BLIND
10625.00 77.71 104.55 8669.81 -581.89 2494.63 5973562.15 631521.07 10.00 1869.47 180.00 BLIND
10650.00 75.21 104.55 8675.66 -588.00 2518.15 5973556.45 631544.69 10.00 1886.79 180.00 BLIND
10675.00 72.72 104.55 8682.57 -594.03 2541.41 5973550.82 631568.04 9.99 1903.91 180.00 BLIND
10696.37 70.58 104.55 8689.30 -599.11 2561.05 5973546.08 631587.77 9.99 1918.38 180.00 TD
CDR1 i.
BOP Wellhead Stack for Drilling Operations
5.59'
11.2'
12.2'
Shaffer BOPE 5K W.P , I
13.85'
5-1/2' Lubrl~t~
I
ri i
15.89 ................................................................
16.65
T.O.T. BOPE 5K W.P '
19.5
Ann.l!r BOP (Hlrdrll) 7-1/16' ID
BOP (Hydrll) 7-1/16~ ID
Top Blind / Shear
Btm 2.3/8~ Rams
Rig floor
Ktll L~e
Top 2.7/S~ Pipe / Slips
Btm 2.3/8~ Pipe / Slips
Manual Master Valve
21.1' · ...........................................................................
I
9-5/Ir Annulus
13-3/Ir Annulus
Ground Level
DATE ~ CHECK NO.
,o,I
, -- po1~115o
v,-,,,,.,,.,,-, ^Lt~Si~OILA O0
DATE INVOICE / caEonr MEMO DESCRIPTION GROSS DISCOUNT NET
O&OlO1 CKO&OIO1F 100. O0 100. O0
PYMT COMMENTS: PERI'IT TO DRILL FEE
HANDLING INST: S/H - TERRIE HUBBLE X4628
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. B ~[1~-~ ~ ]
1 00_ O0 100. O0
RD. BOX 196612 .-:_ -. : :.--' ; .... .~ _ · .-._ -; · ;- -=' --.; - .-:--:' : · ~ON~CI~BANK: ' ;' ;_.:--;--..';-..~NSOUDA~D.~MM~RCI~'AC~U~
' '
· :' .'-' ' ': ' .~.:");"-' :';-~':-- ~'-~:~::'"'-~' ':-;'~ :' ."~"- ':~:;:~:' ;;:?'::-' '- ' ;?;~': ".'--" NO' ~lO> -~ :': ....... iA ~ ':~-:-'-... ": .....
To The '.."ALASKA OIE AND..~-.~ ' ::~ ';:':;_;-;'::;'.. -;-;;;-:=. ~:~:~s::~ - - "--:";':;:-: ' -.-.. ;. :...:~:_ ~;--~;::s;?:/ ' -.:;;.~': - "/:: ;:'::"-.
ORDER '" (ONSER VA~I O~-:':~DH~[SS~:ON
' -"~--'-'-=-;,.~~so-',' ,:Oh~O~-a~': ooa-q:'~'~,i:--- '-' - ' '----
TRANSMITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
CHECK 1 CHECK WHAT APPLIES
STANDARD LETTER
DEVELOPMENT
DEVELOPMENT
REDRILL
EXPLORATION
INJECTION WELL
INJECTION WELL
REDRILL
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
ANNULAR. D~POSAL
( ,ri)NO
ANNULAR DISPOSAL
( ) YES
ANNULAR DISPOSAL
THIS WELL
DISPOSAL INTO OTHER
ANNULUS
( ) YES +
SPACING EXCEPTION
"CLUE"
The permit is for a new wellbore segment of existing well
, Permit No, .~ APl No. ~.
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(0, ali records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested...
Annular Disposal. of drilling wastes will not be approved...
Annular Disposal of drilling wastes will not be approved...
Please note that an disposal of fluids generated...
Enclosed is the approved application for permit .to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing 'exception.
{ComPany Name) will assume the liability of any protest to
the spacing exception that may occur.
Templates are located m drive\jody\templates
Wi~l~. PERMIT CHECKLIST COMPANY ~ ~) day ~ redrll ~
wELL NAME~Z4 ~'~-.~,~Z~PROGRAM: exp
serv
wellbore sag
ann. disposal para req
FIELD & POOL ~ ~c~/' ~',~
INIT CLASS
ADMINISTRATION 1.
.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Permit fee attached .......................
Lease number appropriate ...................
Unique well name and number ..................
Well located in a defined pool ..................
Well located proper distance from drilling unit boundary ....
Well located proper distance from other wells ..........
Sufficient acreage available' in ddlling unit ............
If deviated, is wellbore plat included ............. . .
Operator only affected party ...................
Operator has appropriate bond in force .............
Permit can be issued without conservation order ........
Permit can.be issued without administrative approval ......
Can permit be approved before 15-day wait ...........
ENGINEERING 14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
A,~ DATE 26.
~L;~'" 27.
28.
29.
GEOLOGY 30.
31
32.
Conductor string provided ......... . ..........
Surface casing protects all known USDWs ...........
CMT vol adequate to circulate on conductor & surf csg .....
GEOL AREA
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
UNIT#
CMT vol adequate to tie-in long string to surf csg .... ....
CMT will cover all known productive horizons ..... ' .....
Casing designs adequate for C, T, B & permafrost .......
Adequate tankage or reserve pit .................
If a re-drill, has a 10-403 for abandonment been approved...
Adequate weilbore separation proposed ....... ~ ......
Y
Y
,7',/' ~,'~, ¢ ~ ON/OFF SHORE
If diverter required, does it meet regulations .......... ,~-~1~,
Drilling .fluid program schematic & equip list adequate ..... ~(~ N . .
BOPEs, do they meet regulation . ............ '... (~} N ~ . ,~ '
BOPE press rating appropriate; test to ~~) 13sig. (~N ~-~,~-~. ~-c.~-~,~ ~ ~_,,~._~r,,=~ ~D,~,~, .'
Choke manifold complieS w/APl RP-53 (May 84) ........
Work will occur without operation shutdown ...........
Is presence of H2S gas probable... ............... Y
Permit can be issued wlo hydrogen sulfide measures ...... Y N
Data presented on potential overpressure zones ....... Y
Seismic analysis of shallow gas zones ........ , .... ~,l~r ._ /~_~J~-h/~ ,,
Seabed condition survey (if off-shore) ........... . .
Contact name/phone for weekly progress reports [exploratory o~] Y N · ·
ANNULAR DISPOSAL35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zonei .......
APPR DATE (B) will not contaminate freshwater; or cause drilling waste...
to surface;
(C) will not impair mechanical integrity of the Well used for diSposal;
(D) will not damage producing formation or impair recovery from a
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412.
GEOLOGY: ENGINEERING: ' UICIAnnular COMMISSION:
Comments/Instructions:
1:3
0
Z
0
Z
-I
-r
c:~nsoffice\wordian~diana\checklist (rev. 111011100) '
.,
Well History File
APPENDIX
Information of detailed nature that is not
particularly gennane to the Well Pennitting Process
but is part of the history file. .
To improve the readability of the Well History file and to
simplify finding information, information of this
. .
nature is accumulated at the end of the file under APPEN.DIX.
No special' effort has been made to chronologically
. .
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Aug 21 07:53:03 2002
Reel Header
Service name.............LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 08 / 21
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................UNKNOWN
Continuation Number......01
Previous Reel Name.......UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Tape Header
Service name.............LISTPE
Date.....................02/08/21
Origin. . . . . . . . . . . . .. . . . . . STS
Tape Name................ UNKNOWN
Continuation Number......Ol
Previous Tape Name.......UNKNOWN
Comments.................STS LIS
Writing Library.
aO/-/~þ
loqg'O
Scientific Technical Services
Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 3
AK-MW-l1129
S. LATZ
li'ffiITLOW/ GOOD
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 7
AK-MW-11l29
B. JAHN
WHITLOW/EGBE
#
SURFACE LOCATION
SECTION:
TŒ'ilNSHI P:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
OPEN HOLE
BIT SIZE (IN)
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
M-24A
500292093901
BP Exploration
Sperry Sun
2l-AUG-02
MWD RUN 5
AK-MW-1l129
S. LATZ
liiJHITLOliiJ/GOOD
MAD RUN 7
AK-MW-1l129
B. JAHN
WHITLOW/EGBE
6
llN
13E
2269
195
62.70
.00
.00
CASING
SIZE (IN)
13.375
9.625
7.000
DRILLERS
DEPTH (FT)
2682.0
8987.0
9020.0
(.l\laska), Inc.
MWD RUN 6
AK-MW-1l129
S. LATZ
~'ilHITLOW/GOOD
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1 & 2 ARE FOR MILLING THE WINDOW AND ARE
NOT PRESENTED.
3. MWD RUN 4 IS NOT PRESENTED AND NO FOOTAGE WAS
DRILLED.
4. MWD RUNS 3 & 5 ARE DIRECTIONAL WITH NATURAL GAMMA
PROBE (NGP)
UTILIZING A SCINTILLATION DETECTOR.
5.
~iJD RUNS 6 & 7 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR)
UTILIZING GEIGER MUELLER TUBE DETECTORS AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4 (EWR4).
6. GAMMA RAY (SGRD) LOGGED BEHIND CASING FROM 9003' MD,
8480' SSTVD TO
9020' MD, 8496' SSTVD.
7. ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4) DATA
FROM
9010' MD, 8487' SSTVD TO 9451' MD, 8694' SSTVD WAS
OBTAINED ON A
MADPASS WHILE PULLING OUT OF THE HOLE AFTER
DRILLING MWD RUN 7.
ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4)
m\Tl\ FROM
9451' MD, 8694' SSTVD TO 9646' MD, 8678' SSTVD WAS
OBTAINED ON A
MADPASS WHILE RUNNING IN THE HOLE BEFORE DRILLING
M1'JD RUN 7.
THIS WAS DONE TO COMPLETE THE RESISTIVITY DATA LOST
DUE TO A TOOL
FAILURE ON MWD RUN 600. THIS DATA IS APPENDED TO
MWD RUN 7 DATA.
8. A MADPASS WAS PERFORMED WHILE PULLING OUT OF THE
HOLE AFTER
DRILLING MWD RUN 7 AND IS PRESENTED AS A TAIL TO
THIS LOG.
9. DIGITAL DATA ONLY IS DEPTH CORRECTED TO THE PDC LOG
OF
08/04/01 (MNCL GR) WITH KBE = 62.7' A.M.S.L..
THIS WE.LL KICKS OFF FROM M-24 AT 9020' MD, 8496'
SSTVD (TOP OF WHIPSTOCK).
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCES.
10. MWD RUNS 1 7 REPRESENT WELL M-24A WITH API #
50-029-20939-01.
THIS WELL REACHED A TOTAL DEPTH OF 10886' MD, 8736'
SSTVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME
$
File Header
Service name.............STSLIB.OOl
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPX
RPS
RPD
RPM
ROP
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
9001.5
9009.5
9009.5
9009.5
9009.5
9009.5
9031.0
STOP DEPTH
10836.5
10848.0
10848.0
10848.0
10848.0
10848.0
10882.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVl\LENT UNSHIFTED DEPTH---------
BASELINE
9001. 5
9004.5
9009.0
9011. 0
9015.5
9025.5
9027.5
9041.5
9050.5
9054.5
9057.5
9081.5
9088.5
9093.5
9099.5
9110.5
9114.0
9116.0
9119.0
9132.0
9135.0
9138.5
9152.0
9165.0
9176.5
9188.5
9193.0
9196.5
9215.5
9223.5
9224.5
9241. 0
9244.5
9263.0
9269.0
9276.5
9283.0
9287.5
9292.5
9307.5
9369.5
9375.5
9377.0
9389.5
9393.5
9402.0
9405.5
9412.0
DEPTH
GR
9002.5
9005.5
9009.5
9011.5
9016.5
9027.0
9028.5
9043.5
9052.5
9056.5
9060.0
9083.5
9091.5
9096.5
9102.5
9112.5
9116.0
9118.0
9121.0
9134.0
9137.0
9140.5
9154.0
9167.5
917 8.5
9190.0
9192.5
9196.0
9216.0
9222.5
9225.0
9239.5
9243.5
9262.0
9269.0
9276.0
9284.0
9287.5
9291. 5
9308.5
9368.0
9372.5
9375.5
9389.5
9393.5
9401.0
9405.0
9410.0
9422.0
9440.0
9442.5
9455.5
9463.5
9534.5
9543.5
9561.5
9569.0
9583.0
9605.5
9611. 5
9618.0
9621. 5
9628.5
9633.5
9644.5
9647.0
9692.5'
9707.5
9722.0
9732.5
9737.5
9742.5
9752.5
9759.0
9768.0
9792.0
9810.0
9821.5
9832.0
9856.5
9869.0
9890.5
9917.0
9934.0
9943.5
9952.0
9964.5
9970.5
9976.0
9990.5
9996.0
9998.5
10000.0
10005.0
10010.5
10017.0
10024.5
10035.0
10043.5
10049.5
10072.0
10091.5
10131.0
10186.5
10208.5
10231.5
10258.5
10278.5
10291.5
10306.0
10329.5
10335.0
10344.5
10354.0
10359.0
10364.5
10369.5
10380.0
10402.0
10407.0
10429.0
10443.5
10454.0
9419.5
9441.0
9445.5
9458.0
9465.5
9534.5
9542.5
9560.5
9568.5
9583.0
9605.0
9612.0
9619.5
9623.5
9630.0
9633.0
9646.0
9650.0
9695.0
9709.5
9722.0
9736.0
9741. 0
9747 . 0
9755.5
9763.0
9773.5
9796.0
9813.0
9825.0
9834.5
9859.0
9871.0
9892.0
9921.0
9939.0
9949.5
9956.0
9966.5
9973.5
9978.0
9992.5
9998.0
10000.5
10002.0
10005.0
10010.5
10018.0
10025.0
10036.5
10045.5
10051.5
10072.0
10094.5
10134.5
10190.0
10213.5
10235.5
10262.0
10279.0
10295.5
10311.5
10335.0
10339.5
10348.5
10358.0
10362.5
10367.5
10373.5
10384.0
10406.5
10411.0
10433.5
10449.0
10457.5
10463.5
10500.0
10505.5
10512.5
10516.5
10534.0
10545.0
10552.5
10568.5
10574.5
10585.5
10594.5
10600.0
10611.5
10614.5
10618.0
10622.5
10626.0
10629.0
10635.5
10638.0
10642.0
10653.5
10658.5
10662.0
10666.5
10671.5
10673.5
10677.5
10708.0
10709.0
10713.0
10715.0
10882.5
$
10467.0
10505.0
10512.0
10520.0
10523.5
10540.5
10552.5
10560.5
10575.5
10582.5
10592.5
10605.0
10609.0
10619.0
10621.5
10624.5
10630..0
10634.0
10638.0
10641. 5
10644.5
10648.5
10658.5
10664.0
10667.0
10670.0
10675.0
10677.5
10682.0
10713.0
10714.5
10716.0
10718.5
10886.0
#
MERGED
PBU
MWD
MWD
MWD
MWD
$
DATA SOURCE
TOOL CODE
BIT RUN NO
3
5
6
7
MERGE TOP
9002.5
9068.5
9500.5
9680.5
MERGE BASE
9068.0
9500.0
9680.0
10886.0
#
REMARKS:
M~RGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... - 9 9 9
Depth Units.......................
Datum Specification Block sub-tj~e...O
Name Service Order Uni.ts Size Nsarn Rep Code Offset
DEPT FT 4 1 68 0
ROP MWD FT/H 4 1 68 4
GR MWD API 4 1 68 8
RPX MliiJD OHMM 4 1 68 12
RPS MWD OHMM 4 1 68 16
RPM MWD OHMM 4 1 68 20
RPD MWD OHMM 4 1 68 24
FET NWD HR 4 1 68 28
Name Service Unit
DEPT FT
ROP MWD FT/H
Min
9001. 5
0.67
Max
10882.5
1455.72
Mean Nsam
9942 3763
97.033 3704
Channel
1
2
3
4
5
6
8
First
Reading
9001. 5
9031
Last
Reading
10882.5
10882.5
GR MWD API 21. 9 800.55 47.0814 3671 9001.5 10836.5
RPX MWD OHMM 0.19 2000 27.1013 3678 9009.5 10848
RPS MWD OHMM 0.16 2000 23.1742 3678 9009.5 10848
RPM MWD OHMM 0.53 2000 23.2233 3678 9009.5 10848
RPD MWD OHMM 0.04 178.59 15.1354 3678 9009.5 10848
FET MWD HR 0.23 163.48 19.0483 3678 9009.5 10848
First Reading For Entire File..........9001.5
Last Reading For Entire File...........10882.5
File Trailer
Service name.............STSLIB.001
Service Sub Level Name...
Version Number........... 1. 0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.002
Physical EOF
File Header
Service name............. STSLIB. 002
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation.......02/08/21
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED Ml\D
Depth shifted and
DEPTH INCREMENT:
#
FILE SUl'-'!MARY
PBU TOOL CODE
GR
FET
RPX
RPS
RPM
RPD
RAT
$
2
clipped curves; all MAD runs merged using earliest passes.
.5000
START DEPTH
9439.5
9448.0
9448.0
9448.0
9448.0
9448.0
9484.0
STOP DEPTH
10836.0
10847.0
10847.0
10847.0
10847 . 0
10847.0
10881.5
#
MERGED
PBU
MWD
$
DATA SOURCE
TOOL CODE
MAD RUN NO. MAD PASS NO. MERGE TOP
7 1 9010.0
MERGE BASE
10886.0
#
REMARKS:
MERGED MAD PASS.
$
#
Data Forroat Specification Record
Data Record Type..... . . . . . . . . . . . . .0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing... ... . . . . . . . . . . . . . . .60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MAD FT / H 4 1 68 4 2
GR MAD API 4 1 68 8 3
RPX MAD OHMM 4 1 68 12 4
RPS MAD OHMM 4 1 68 16 5
RPM MAD OHMM 4 1 68 20 6
RPD MAD OHMM 4 1 68 24 7
FET M.l\D HR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9439.5 10881. 5 10160.5 2885 9439.5 10881. 5
RAT MAD FT/H 193.67 951.54 910.417 2796 9484 10881.5
GR MAD API 15.23 146.77 36.9908 2794 9439.5 10836
RPX MAD OHMM 3.37 62.92 10.3221 2799 9448 10847
RPS MAD OHMM 3.2 65.12 12.6954 2799 9448 10847
RPM M.l\D OHMM 3.14 90.88 14.3603 2799 9448 10847
RPD HAD om'1M 3.39 86.5 15.2026 2799 9448 10847
FET MAD HR 2.66 58.18 22.4303 2799 9448 10847
First Reading For Entire File..........9439.5
Last Reading For Entire File...........l0881.5
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.003
Physical EOF
File Header
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9002.5
ROP 9032.0
$
3
header data for each bit run in separate files.
3
.5000
STOP DEPTH
9037.5
9068.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
30-JUL-Ol
Insite 4.05.5
3.3
Memory
9068.0
.0
.0
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERl\TURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
TOOL NUMBER
002
3.750
FLO-PRO
8.60
45.0
10.5
23000
9.8
.000
.000
.000
.000
.0
129.0
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DE PT FT 4 1 68 0 1
ROP ~n~D030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9002.5 9068 9035.25 132 9002.5 9068
ROP MWD030 FT/H 0.87 729.92 45.9492 73 9032 9068
GR MWD030 API 46.04 794.38 94.3414 71 9002.5 9037.5
First Reading For Entire File..........9002.5
Last Reading For Entire File...........9068
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.004
Physical EOF
File Header
Service name.............STSLIB.004
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREHENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
header data for each bit run in separate files.
5
.5000
START DEPTH
9038.0
9068.5
STOP DEPTH
9469.5
9500.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
HINIMUH ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE 'rOOL 'rYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERl\TURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMl\.RKS :
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
31-JUL-Ol
Insite 4.05.5
3.3
Memory
9500.0
16.5
91. 9
TOOL NUMBER
002
3.750
Flo-Pro
8.60
40.0
9.5
23000
7.8
.000
.000
.000
.000
.0
141.7
.0
.0
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DE PT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR ~MD050 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9038 9500 9269 925 9038 9500
ROP MWD050 FT/H 1. 21 17 9.03 65.0495 864 9068.5 9500
GR MWD050 API 21. 93 800.55 75.9609 864 9038 9469.5
First Reading For Entire File..........9038
Last Reading For Entire File...........9500
File Trailer
Service name..._.__.__...STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name......... ..STSLIB.005
Physical EOF
File Header
Service name.............STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.004
Comment Record
FI LE HK1\.DER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9470.0
ROP 9500.5
$
5
header data for each bit run in separate files.
6
.5000
STOP DEPTH
9634.0
9680.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOliiJNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM P,NGLE:
}tlAXIMUM ANGLE:
31-JUL-Ol
Insite 4.05.5
4.3
Memory
9680.0
93.8
96.5
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT ~~ CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point.. ............Undefined
Frame Spacing............. ........60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
TOOL NUMBER
72829
3.750
Flo-Pro
9.61
.0
8.5
23000
8.8
.140
.073
.150
.160
70.0
141. 0
70.0
70.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DE PT FT 4 1 68 0 1
ROP ~D060 FT/H 4 1 68 4 2
GR ~~D060 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9470 9680 9575 421 9470 9680
ROP MWD060 FT/H 19.52 195.37 119.278 360 9500.5 9680
GR MWD060 API 22.52 76.78 38.5716 329 9470 9634
First Reading For Entire File..........9470
Last Reading For Entire File...........9680
File Trailer
Service name.............STSLIB.005
Service Sub Level Name...
Version Number........... L 0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name....... ....STSLIB.006
Physical EOF
File Header
Service name.............STSLIB.006
Service Sub Level Name...
Version Number... . . . . . . . .1. 0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAYA)' MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
6
header data for each bit run in separate files.
7
.5000
START DEPTH
9010.0
9010.0
9010.0
9010.0
9010.0
9634.5
9680.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (F'1'):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
HINIMUM ANGLE:
tvlAXIHUH ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
STOP DEPTH
10851.5
10851.5
10851.5
10851.5
10851. 5
10840.0
10886.0
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE }\ND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
HUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT}:
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
02-AUG-Ol
Insite 4.05.5
4.3
Memory
10886.0
58.5
94. 5
TOOL NUMBER
69706
PB02048RF3
3.750
Flo-Pro
8.60
52.0
9.0
23000
9.8
.160
.079
.210
.230
75.0
158.0
70.0
70.0
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Ty~e.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record......... ....Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX MWD070 OHMM 4 1 68 12 4
RPS MWD070 0 HIvIM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
FET MWD070 HR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9010 10886 9948 3753 9010 10886
ROP MWD070 FT/H 0.67 1455.72 106.921 2412 9680.5 10886
GR MWD070 API 21. ':) 154.42 36.3816 2412 9634.5 10840
RPX MWD070 OHMM 0.19 2000 26.9876 3684 9010 10851.5
RPS MWD070 OHMM 0.16 2000 23.6254 3684 9010 10851. 5
RPM MWD070 OHMM 0.53 2000 23.6914 3684 9010 10851.5
RPD MWD070 OHl'-lM 0.04 178.59 15.1755 3684 9010 10851.5
FET MWD070 HR 0.23 163.48 19.1269 3684 9010 10851.5
First Reading For Entire File_______.__9010
Last Reading For Entire File...........10886
File Trailer
Service name.............STSLIB.006
Service Sub Level Name...
Version Number...........1. O. 0
Date of Generation.......02/08/21
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.007
Physical EOF
File Header
Service name.............STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Dáte of Generation.......02/08/21
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.006
Comment Record
FILE HElmER
FILE NUMBER:
RAW MAD
Curves and log
DEPTH INCREMENT:
MAD RUN NUMBER:
MAD PASS NUMBER:
#
FILE SUMMARY
7
header data for each pass of each run in separate files.
.5000
7
1
VENDOR
GR
RPD
RPM
RPS
FET
RPX
RAT
$
TOOL CODE
START DEPTH
9440.5
9451. 0
9451. 0
9451.0
9451.0
9451. 0
9485.5
STOP DEPTH
10839.5
10850.5
10850.5
10850.5
10850.5
10850.5
10885.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
RElvlARKS :
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.. ...0
Logging Direction... ..... ...... ...Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
02-AUG-Ol
Insite 4.05.5
4.3
Memory
10886.0
58.5
94.5
TOOL NUMBER
69706
PB02048RF3
3.750
Flo-Pro
8.60
52.0
9.0
23000
9.8
.160
.079
.210
.230
75.0
158.0
70.0
70.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MAD07l FT/H 4 1 68 4 2
GR MAD07l API 4 1 68 8 3
RPX MAD07l OHMM 4 1 68 12 4
RPS Jl.1AD071 OHMM 4 1 68 16 5
RPM M..l\DO 71 OHMM 4 1 68 20 6
RPD MAD071 OHMM 4 1 68 24 7
FET MADO 71 HR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9440.5 10885 10162.8 2890 9440.5 10885
RAT MAD07l FT/H 193.67 951. 54 910.64 2800 9485.5 10885
GR MAD071 API 15.23 146.77 37.0134 2799 9440.5 10839.5
RPX MAD071 OHMM 3.37 62.92 10.3165 2800 9451 10850.5
RPS MAD071 OHMM 3.2 65.12 12.7096 2800 9451 10850.5
RPM MAD071 OHMM 3.14 90.88 14.3939 2800 9451 10850.5
RPD HAD071 0 Hr.-1M 3.39 86.5 15.2425 2800 9451 10850.5
FET MAD071 HR 2.66 58.18 22.4179 2800 9451 10850.5
First Reading For Entire File...._--...9440.5
Last Reading For Entire File...........l0885
File Trailer
Service name.............STSLIB.007
Service Sub Level Name...
Version Number. ... . . . . . . .1. 0.0
Date of Generation.......02/08/21
Maximum Physical Record..65535
File Type.............. ..LO
Next File Name...........STSLIB.008
Physical EOF
Tape Trailer
Service name.............LISTPE
Date.....................02/08/21
Origin...................STS
Tape Name................UNKNOHN
Continuation Number......Ol
Next Tape Name...........UNKNOWN
Comments.................STS LIS
Writing Library.
Scientific Technical Services
Reel Trailer
Service name._...........LISTPE
Date.....................02/08/21
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................UNKNOWN
Continuation Number......01
Next Reel Name...........UNKN~NN
Comments.. ...............STS LIS
Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File