Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-124 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Saturday, October 17, 2015 1:52 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead;AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Superintendent; AK, D&C Well Services Operations Superintendent;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr; AK, OPS PCC Ops Lead; Burton, Kaity; AK, OPS WELL PAD W; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Sayers, Jessica; Dickerman, Eric; 'jim.regg@alaska.gov' Subject: OPERABLE: Producer W-59 (PTD 2131240) MIT-IA Passed All, Producer W-59 (PTD#2131240) passed a MIT-IA on October 15,2015 following gas lift valve work. The passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. • Well status is Operable • Annuli are fluid packed • A SS5V is not needed Please use caution while placing well on production due to fluid packed annuli and the potential for annular fluid expansion. Thank you, Kevin Parks scAt4HED APR 0 8 2016 (Alternate: Whitney Pettus) BP Alaska-Well Integrity Coordinator GINGlobal Wells Organization Office: 907.659.5102 WIC Email:AKDCWellIntegrityCoordinator@bp.com From: Al -Well Integrity Coordinator Sent: Thursday, September 24, 2015 7:36 AM To: AK, OPS GC2 OSM; AK, OPS GC-2-Eield O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operati s Superintendent; AK, D&C Well Services Operations Superintendent; AK, RES GPB West Wells Opt Engr; AK, RES GPB EafitVells Opt Engr; Burton, Kaity; AK, OPS WELL PAD W; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Tilbu Obert C (CDI); 'jim.regg@alaska.gov' Subject: UNDER EVALUATION: Producer W-59 (PTD 2131240) Sustained Inner Ann Casing Pressure over MOASP All, 1 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Monday, August 17, 2015 1:01 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Superintendent; AK, D&C Well Services Operations Superintendent;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Burton, Kaity; AK, OPS WELL PAD W; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Whitney; 'jim.regg@alaska.gov' Subject: NOT OPERABLE: Producer W-59 (PTD 2131240) Sustainted Inner Annulus Casing Pressure over MOASP All, Producer W-59 (PTD 2131240) was reported to have sustained inner annulus casing pressure above MOASP on August 15, 2015. On August 16, 2015 the pressures were confirmed to be TBG/IA/OA= 2140/2140/0 psi. A subsequently cold TIFL failed the same day. As the well is unavailable to be brought online due to surface constraints, the well has been reclassified as Not Operable until integrity can be verified or restored. Plan Forward: 1. Downhole Diagnostics:TIFL—FAILED 08/16/15 2. Slickline: Change out orifice gas lift valve 3. Downhole Diagnostics: Re-TIFL 4. Well Integrity Engineer: Additional diagnostics as needed A copy of the TIO plot has been included for reference. Please call with any questions or concerns. Thank you, SCANNED AUG 2 4 2015 Whitney Pettus (Alternate: Kevin Parks) BP Alaska-Well Integrity Coordinator G WIC Office: 907.659.5102 WIC Email: AKDCWeIlIntegrityCoordinator(alBP.com 1