HomeMy WebLinkAbout201-1467. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU 15-41B
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
201-146
50-029-22492-02-00
12777
Conductor
Surface
Intermediate
Liner
Liner
8800
80
3925
10406
425
2512
10187
20"
9-5/8"
7"
5"
2-3/8"
8029
36 - 116
39 - 3964
32 - 10438
10270 - 10695
10265 - 12777
36 - 116
39 - 3558
32 - 8276
8111 - 8529
8106 - 8800
none
470
4760
5410
7250
11780
10098 , 10312
1490
6870
7240
8290
11200
10137 - 12720
3-1/2" 9.2# 13Cr80 30 - 10281
7980 - 8798
Structural
4-1/2" Baker S-3 , 10120 , 7963 No SSSV
10120 , 10210
7963 , 8052
Bo York
Operations Manager
Jerry Lau
Jerry.Lau@hilcorp.com
907-564-5280
PRUDHOE BAY, PRUDHOE OIL / PUT RIVER OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028306
30 - 8122
48
0
5865
0
2
0
0
0
251
0
N/A
13b. Pools active after work:PUT RIVER OIL
4-1/2" Baker SABL-3 , 10210 , 8052
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
Digitally signed by Bo York
(1248)
DN: cn=Bo York (1248)
Date: 2024.02.19 19:48:21 -
09'00'
Bo York
(1248)
By Grace Christianson at 1:50 pm, Feb 20, 2024
DSR-2/21/24
RBDMS JSB 022924
WCB 2024-06-25
ACTIVITYDATE SUMMARY
5/5/2023
TFS Unit 4 CMIT- TxIA, max applied pressure 3000 PSI, CMIT-TxIA ***PASSED***
to 2896/2882 psi. Pumped 5.4 bbls crude to Reach Max applied pressure of 3000 psi.
1st 15 min TxIA lost 90/91 psi. 2nd 15 min TxIA lost 24/27 psi. total loss of 114/118
psi Tag hung on MV & IAC. FWHP= 1254/1250/300
5/11/2023
***WELL S/I ON ARRIVAL***
RAN 3' x 1-3/4" STEM, 2.80" G-RING, DRIFT FREELY & S/D ON PX-PRONG @
10,095' SLM,
PULLED PX-PRONG FROM 10,098' MD
***WSR CONT ON 5-12-23***
5/12/2023
***WSR CONT FROM 5-11-23***
PULLED 2.813" PX-PLUG BODY FROM 10,098' MD
DRIFTED w/ 2.71" x 55" WRP DRIFT, DRIFTED FREELY TO 10,270' SLM,
***JOB COMPLETE, WELL LEFT S/I***
5/21/2023
***WELL S/I ON ARRIVAL***
PRESSURE TEST PCE 200#LP-3,000#HP
RIH W/ 1-7/16 CHD (1" FN), 2 X 1-11/16" WB, 1 X 2" WB, 2-1/8" CCL, LONG
STROKE SETTING TOOL, NS 350-275 COMPOSITE PLUG (2.725" MAX OD, 24'
OAL)
ME SET DEPTH=10,208', CCL OFFSET=9.1', CCL STOP DEPTH=10,198.9'
SET PLUG W/ GOOD ELECTRICAL INDICATION & 190# WEIGHT LOSS
RIH W/ 1-7/16'' CHD (1" FN), 2" WB, 2-1/8" CCL, 30' X 2.5" DUMP BAILER
(LOADED W/ 5 GAL 17 PPG NEO CEM, 2.5" MAX OD, 39' OAL)
DUMP A TOTAL OF 10 GAL OF 17 PPG CEMENT ATOP CBP (EST TOC @
10,187')
INSTALL & PT TREECAP
***WELL LEFT S/I***
5/25/2023
T/I/O= 952/1058/313 Temp= S/I (TFS Unit 4 and 3 Conduct Injectivity/Step Rate
Test) Pumped 3 bbls of 60/40 followed by 55 bbls of KCL down TBG for Load.
Further Pumped 124 bbls of KCL down TBG for Injectivity/Step rate test. See TFS
Unit 3 Awgers report for total Injection rates and Pressure. Freeze Protected TBG
with 3 bbls of 60/40 followed by 39 bbls of Crude. Freeze protected FL with 2 bbls of
crude followed by 6 bbls of Crude. Pressured FL to 1000 psi per DSO. Tag hung and
tag given to DSO.
Final WHPS 2300/1841/323
5/29/2023
T/I/O = 410/830/330. Temp = SI. T FL (DSO req). No AL. T FL @ 2100' (19 bbls).
SV, WV = C. SSV, MV = O. IA, OA = OTG. 12:30
9/17/2023
T/I/O = 1010/1010/320. Temp = SI. T FL (E-line request). No AL. T FL @ surface.
SV, WV, SSV = C. MV = O. IA & OA = OTG. 18:00
9/17/2023
***WELL S/I UPON ARRIVAL***
MIRU HES
SHUT DOWN DUE TO WIND
RDMO HES
***WELL S/I UPON DEPARTURE***
Daily Report of Well Operations
PBU 15-41B
Daily Report of Well Operations
PBU 15-41B
9/18/2023
***WELL S/I UPON ARRIVAL***
MIRU HES
PT PCE 300PSI LOW 3000PSI HIGH
CORRELATE TO PDS JEWELRY LOG DATED 2-MAY-03
PERFERATED INTERVAL 10137'-10167' WITH 2.5" 3SPF 120PHASE HSC W/ GEO
REFRAX CHARGES
RDMO HES
***WELL S/I UPON DEPARTURE***
9/28/2023
***WELL S/I ON ARRIVAL***
RAN 4 1/2" BRUSH, AND 2.80" GAUGE RING, BRUSH X NIPPLE @ 10,087' SLM
(10,098' MD). TAG CEMENT @ 10,175' SLM (10,087' MD)
DRIFTED 20' x 2.74" DUMMY WHIPSTOCK, DRIFT CLEANLY TO TOC @ 10,176'
SLM
LOGGED HES CALIPER FROM 10,170' SLM, LOG TO SURFACE (good data)
ATTEMPTED TO SET 2.81'' NIP-REDCER ( s/d high)
RAN 3-1/2'' BLB, 2.85'' G-RING BRUSH TBG @ ~7744' SLM & TAG X-NIP @ 10,89'
SLM
RAN 3-1/2'' X-LINE, X-LOCK (sel) (2.813'') NIP- REDUCER (lih 30") (min id 1.78'')
(cont on next day)
***WSR CONT ON 9-29-23***
9/29/2023
***WSR CONT FROM 9-28-23***
SET NIPPLE REDUCER IN X NIPPLE @ 10,098' MD.
RAN CHECK SET, NOT SHEARED.
PULLED NIPPLE REDUCER.
RE-SET NIPPLE REDUCER IN X NIPPLE @ 10,098' MD (REDUCER HAS 1.781" R
NIPPLE).
RAN CHECK SET (GOOD SET).
SET 1.781" RR PLUG IN NIPPLE REDUCER @ 10,098' MD.
***WELL S/I ON DEPARTURE***
10/15/2023
T/I/O = SSV/1040/320. Temp = SI. IA FL (EL). 2" hardline rigged up on IA. IA FL @
surface.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 21:00
10/18/2023
***WELL S/I UPON ARRIVAL***
MIRU HES
MIRU REED
MIRU T-BIRD
SET DOWN AT 8581 WITH 500# OVER PULL
MADE OTHER ATTEMPTS
TOWN INSTRUCTED TO POOH
AFTER DISCUSSION; RD AND HAVE SL CLEAN OUT WELL
RDMO T-BIRD
RDMO READ
RDMO HES
***WELL S/I UPON DEPARTURE***
10/18/2023
T/I/O= x/x/x TFS Unit 2 Assist ELine with LDL ****JOB CANCELED***** Well
left in ELine control upon departure
PERFERATED INTERVAL 10137'-10167'
Daily Report of Well Operations
PBU 15-41B
10/19/2023
***WELL S/I ON ARRIVAL*** (Hot oil tbg wash)
DRIFT W/ 2-7/8" BRUSH & 2.25" G. RING TO RESTRICTION 8,530' SLM (tools
clean)
RAN LOOSE 3-1/2" BRUSH & 2.50" SAMPLE BAILER TO 8,734' SLM (unable to get
further, bailer full of asphaltines)
RAN 10' x 2.25" DRIVE DOWN BAILER TO 10,098' MD (emtpy)
DRIFT W/ 2.83" G. RING TO 10,098' MD (all clear)
PULLED RK-DGLV AT ST# 4 (10,026' md)
B&F TBG W/ 3-1/2" BRUSH & 2.83" G.RING TO 10,098' MD (LRS pumped 75 bbls
hot diesel)
RAN BOWSPRING CENT, 10' x 2.78" DMY GUN, BOWSPRING CENT, 10' x 2.78"
DMY GUN TO 10,098' MD
RAN DOUBLE BOWPRING CENT, 2.25" CENT & 20' x 1.75" BAILER TO 10,098'
MD
SET RK-DGLV AT ST# 4 (10,026' md)
***WELL S/I ON DEPARTURE***
10/19/2023
T/I/O 1110/1025/323 Assist SL B&F Pumped 75 bbls 180*f Diesel down TBG/taking
reuturns up IA and down 15-38 FL. Pumped 75 bbls cold diesel flush down
TBG/taking rueturns to 15-38 FL. Pumped 3 bbls 60/40 methanol down hardline from
IA on well 15-41 to 15-38 tree. RDMO SL in control of well upon LRS departure. IA
and OA = OTG.
10/20/2023 (Standby for weather) TFS U3. Standby for weather *Job continues to 10-21-23*
10/20/2023
***WELL S/I UPON ARRIVAL***
MIRU HES
WIND READINGS 26MPH GUST AND 23 MPH SUSTAINED AT TIME OF RIG UP
MIRU T-BIRD
MIRU READ
TAG PLUG AT 10098'
PRESSURE UP IA TO 2000PSI
STOP COUNTS ACROSS GLM AT 10026'
UP PASS FROM 10098' TO 9122'
STOP COUNTS ACROSS GLM AT 9143'
NO LEAK DETECTED
RECONFIGURE TO PUMP DOWN TUBING TO IA;
LEAK DETECTED; CALCULATED TO BE 0.2BBL/M
UP PASS FROM 10098 TO 9849'
LOST COMMUNICATION WITH TOOLS; POOH
LAY DOWN AND SECURE LOCATION;
***CONTINUED ON 21-OCT-2023 WSR***
10/20/2023
T/I/O= 1150/1150/500 TFS Unit 3 Assist ELine as directed Pumped 1 bbl of
60/40 followed by 1 bbl Crude to pressure IA to 2000 psi for LDL Pumped 15
bbls of Crude down TBG for log and establish liquid leak rate of 7.5 GPM at 1960 psi.
Pumped 1 bb of 60/40l to FP hardline to 15-38. Pumped 5 bbls of 60/40 to FP 15-41
FL and pressured up to 500 psi PO notified and well left in E-line control upon
departure
Daily Report of Well Operations
PBU 15-41B
10/21/2023
***CONTINUED FROM 20-OCT-23 WSR***
TROUBLESHOOT TOOLS
REHEAD AND REPAIR CRANE
CRANE NEEDS MORE EXPANSIVE REPAIRS RETURN IT TO SHOP
ATTEMPT TO RIG UP NEXT DAY
***CONTINUED ON 22-OCT-23 WSR***
10/21/2023 *Job continues from 10-21-23* (Weather Standby) TFS U3
10/21/2023 TFS Unit 3 assist E-line as directed ***Job postponed***
10/22/2023
***CONTINUED FROM 21-OCT-23 WSR***
MIRU CRANE
MIRU READ
MIRU T-BIRD
PRESSURE TUBING TO 2000PSI
UP PASS FROM 10098' TO 9050'
LEAK DETECTED AT 9151'
STOP COUNTS OVER LEAK INTERVAL
RESTART UP PASS FROM 9240' TO SURFACE
TOTAL CRUDE PUMPED WAS 152 BBL
T-BIRD FREEZE PROTECT HARD LINE
RDMO T-BIRD
RDMO HES
***WELL SHUT IT UPON RIG DOWN***
CONTINUE ON 24-OCT-2023 WSR
10/22/2023
T/I/O=1000/1000/250 TFS Unit 3 Assist E-Line as directed. Pumped 152 bbls of
crude down the TBG taking returns up the IA for an LDL. Pumped 1 bbls of 60/40
down the hardline to 15-38 to FP. Performed a man down Drill discussing what to do
in the event our 3rd hand finds the operator and assistant on the floor of the well
house. he did not come into the well and called emergancy services immidiatly. Well
left in control of Eline upon departure
10/23/2023
***WELL S/I ON ARRIVAL***
PULLED RR PLUG FROM NIPPLE REDUCER @ 10,098' MD.
***CONT ON 10/24/23 WSR***
10/24/2023
***CONT FROM 10/23/2023 WSR***
PULLED NIPPLE REDUCER @ 10,098' MD.
***WELL SHUT IN UPON DEPARTURE***
11/11/2023
***WELL S/I UPON ARRIVAL***
MIRU HES
***CONTINUED ON 12-NOV-23 WSR***
Daily Report of Well Operations
PBU 15-41B
11/12/2023
***WELL SHUT IN ON ARRIVAL*** (SET PATCH)
MIRU HES E-LINE
PT LOW 500 PSI HIGH 3500 PSI;
CORRELATE TO READ LDL DATED 22OCT23
SET OWENS X-SPAN PERMANENT PATCH AT 9,139.0' TO 9,155.5';
CCL TO TOP MID ELEMENT = 10.4', CCL STOP AT 9128.6'
GOOD INDICATION OF SET
RDMO.HES E-LINE
***WELL SHUT IN ON DEPARTURE***
11/24/2023
T/I/O = SSV/1040/330. Temp = SI. T FL (E-line request). AL disconnected in well
house. Opened SSV to get T FL (1000 psi). T FL @ surface.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:30
11/25/2023
***WELL S/I ON ARRIVAL*** (SET 1.80'' OD HEX PLUG IN 3.5 TBG 9.2# )
RIG UP YJ ELINE.
PT PCE 300 PSI LOW /3000 PSI HIGH
RIH W/CH/WB/ 1.69''-CCL/HEX SETTING TOOL/1.80'' HEX PLUG TO SET PLUG
AT 10112' MD, CCL TI MID ELEMENT 15'
CCL STOP DEPTH 10097' MD CCL LOG CORRELATED TO WELL SCHEMATIC
DATED 11/20/2023
JOB COMPLETE
***WELL S/I ON DEPARTURE***
11/26/2023
T/I/O= 0/1000/0 TFSUnit 3 Pumped 1 bbl of Crude to pressure TBG up to 3498 psi.
TBG bled down to 155 psi to attempt pressuring up again, .6 bbls bled back to the
truck. Pumped .6 bbls to pressure up TBG for and MIT-T at 3500 psi
****PASSED**** Reached test pressure on TBG at 3498 psi. First 15 minutes TBG
lost 99 psi. Second 15 minutes TBG lost 28 psi. ****PASSED**** Bled 2 bbls of
Crude to take TBG down to 0 psi. Tags hung and DSO notified upon departure.
12/22/2023
***WELL S/I ON ARRIVAL***
HES 759 R/U
***CONT WSR ON 12/23/2023***
12/23/2023
***CONT WSR FROM 12/22/2023***
PULL 1.80" HEX PLUG @10,117' SLM
***WELL LEFT S/I ON DEPARTURE***
1/15/2024
T/I/O = SSV/990/320. Temp = SI. Bleed IAP to 500 psi (eval TxIA). AL disconected.
IA FL @ surface. Bled IAP to BT to 500 psi in 10 min (1.25 bbls). Monitored for 30
min. IAP increased 40 psi. Final WHPs = SSV/540/320.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 04:00
1/22/2024
OE / RES ENG: Agreed to cancel the final step to pump injectivity test with fullbore.
We have collected enough data to Frac and will use a new AFE and Sundry at a later
date.
1
Regg, James B (OGC)
From:PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent:Wednesday, January 10, 2024 5:01 PM
To:Regg, James B (OGC)
Cc:Wallace, Chris D (OGC); Bo York; Oliver Sternicki
Subject:OPERABLE: Producer 15-41B (PTD #2011460) MIT-T Passed
Mr. Regg,
Producer 15‐41B (PTD #2011460) passed MIT‐T to 3371 psi post tubing patch on 11/26/23 and a previous CMIT‐TxIA
passed on 05/05/23 to 2882 psi which confirms integrity of the primary and secondary well barriers. The tubing plug has
been pulled and the well is now classified as OPERABLE.
Please call with any questions or concerns.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
P: (907) 659‐5102
M: (907) 232‐1005
From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>
Sent: Tuesday, June 13, 2023 2:20 PM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: chris.wallace@alaska.gov; Bo York <byork@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells
Integrity <PBWellsIntegrity@hilcorp.com>
Subject: NOT OPERABLE: Producer 15‐41B (PTD #2011460) TxIA Communication
Mr. Regg,
Producer 15‐41B (PTD #2011460) is a natural flow well with known TxIA communication. The well was placed online,
under evaluation with permission from the AOGCC, to evaluate well economics to support repair of the TxIA comm.
Evaluation has been completed and the well is currently shut in. The tentative plan is to repair the TxIA communication
with a patch in the next month. IA repressurization will be managed by periodic bleed or a plug will be set to secure the
well to keep the IA pressure below MOASP until the patch repair is executed. The well is now classified as NOT
OPERABLE until the primary well barrier has been restored.
Please call with any questions or concerns.
Oliver Sternicki
Hilcorp Alaska, Hilcorp North Slope LLC
Well Integrity Supervisor
Office: (907) 564 4891
Cell: (907) 350 0759
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
2
Oliver.Sternicki@hilcorp.com
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Sunday, May 28, 2023 7:52 AM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com>
Subject: UNDER EVALUATION: Producer 15‐41B (PTD #2011460) TxIA Communication 30 day Economic Evaluation
Mr. Regg,
Producer 15‐41B (PTD #2011460) is a natural flow well with known TxIA communication. A CMIT‐TxIA passed to 2882 psi
on 05/05/23 which confirms casing and packer integrity. After recent zonal isolation, AOGCC has approved production
for up to 30 days to determine economics of a tubing repair (see attached). The well is classified as UNDER EVALUATION
and can be put on production for up to 30 days. The well will be secured following the flowback so that the IA casing
pressure will not exceed NOL.
Please call with any questions or concerns.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
P: (907) 659‐5102
M: (907) 232‐1005
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Wednesday, October 5, 2022 5:55 AM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com>; PB Wells
Integrity <PBWellsIntegrity@hilcorp.com>
Subject: NOT OPERABLE: Producer 15‐41B (PTD #2011460) MIT‐T failed
Mr. Regg,
Slickline set DGLVs on 09/26/22 but a subsequent TIFL failed. On 10/04/22 Slickline set a TTP, performed a passing CMIT‐
TxIA but a failing MIT‐T. The failed MIT‐T indicates a failure in the primary well barrier. The well is now classified as NOT
OPERABLE and will remain secured with a TTP.
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity
andrew.ogg@hilcorp.com
P: (907) 659‐5102
M: (307)399‐3816
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Wednesday, September 28, 2022 1:02 PM
3
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com>; PB Wells
Integrity <PBWellsIntegrity@hilcorp.com>
Subject: UNDER EVALUATION: Producer 15‐41B (PTD #2011460) TIFL Failed
Mr. Regg,
Producer 15‐41 (PTD #2011460) is currently Under Evaluation after it failed a diagnostic TIFL on 09/20/22. On 09/26/22
after Slickline set the DGLV, the well exceeded MOASP on the IA. A subsequent TIFL failed which verifies the excursion
was sustained casing pressure. This email is to satisfy reporting requirements outlined in CO 492.
Plan Forward:
1. Slickline: Set TTP/Perform MITs
2. Well Integrity: Additional diagnostics as needed
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity
andrew.ogg@hilcorp.com
P: (907) 659‐5102
M: (307)399‐3816
From: PB Wells Integrity
Sent: Tuesday, September 20, 2022 3:33 PM
To: Alaska JMS User <akimsuser@hilcorp.com>; Carrie Janowski <Carrie.Janowski@hilcorp.com>; PB EOC Specialists
<PBEOCSpecialists@hilcorp.com>; PB Wells Optimization Engineers <PBWellsOptimizationEngineers@hilcorp.com>; PBE
FS3 Drill Sites <FS3DrillsitesFS3Drillsites@hilcorp.com>; PBE FS3 Field Lead Operator
<PBEFS3FieldLeadOperator@hilcorp.com>; PBE FS3 Foreman <PBEFS3Foreman@hilcorp.com>; Eric Dickerman
<Eric.Dickerman@hilcorp.com>
Cc: Bo York <byork@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio ‐ (C)
<John.Condio@hilcorp.com>; Kevin Brackett <Kevin.Brackett@hilcorp.com>
Subject: UNDER EVALUATION: Producer 15‐41B (PTD #201146) TIFL Failed
All,
Producer 15‐41B (PTD #201146) was reported by operations with increasing IA pressure. Subsequent warm TIFL failed
on 06/20/22 which verifies failure of one or more well barriers. At this time, the well is now classified as UNDER
EVALUATION and on a 28 day clock to be resolved.
Plan Forward:
1. Slickline: Set DGLV
2. DHD: Re‐TIFL
Please call with any questions or concerns.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Rixse, Melvin G (OGC)
To:Jerry Lau
Cc:AOGCC Records (CED sponsored)
Subject:20230526 1509 APPROVAL to Flow 30 Days 15-41B POP U/E PTD# 201-146
Date:Friday, May 26, 2023 3:12:53 PM
Attachments:EXTERNAL RE DS 15-41B Western Put River Production Question (PTD#201-146).msg
FW NOT OPERABLE Producer 15-41B (PTD #2011460) MIT-T failed.msg
15-41B.pdf
Jerry,
Hilcorp is approved to flow under evaluation for 30 days.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-297-8474 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or
privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an
unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake
in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov).
From: Jerry Lau <Jerry.Lau@hilcorp.com>
Sent: Friday, May 26, 2023 12:06 PM
To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Cc: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity
<PBWellsIntegrity@hilcorp.com>; Ryan Holt <Ryan.Holt@hilcorp.com>
Subject: 15-41B POP U/E PTD# 201-146
Mel,
15-41B is a potential Western Put River Producer. We recently isolated the lower zones (Ivishak and
Lower/Central Put River) mechanically to target the western Put River solely – Refer to attached
email addressed to Dave Roby where he signs off on the zonal isolation plan.
The well has TxIA through a leaky GLV (washed out pocket with extended Freudenberg packing on
GLV) and is only open to the Western Put perforations. The well recently passed a CMIT-TxIA to 3000
psi to verify casing/packer integrity. Next, the TTP was pulled to perform an injectivity test to
evaluate if we want to repair the TBG, Frac, and produce the well.
Modeling suggests that the Put River Western lobe should be able to produce 800+ bopd if the
wellwork program is completed.
At this point, we would like to flow under eval to gather production and sample data to
determine economics help us decide on weather to continue with wellwork. Can the AOGCC
grant us permission to do this?
Schematic and original Not operable email attached
Let me know if you have any questions.
Thanks.
Jerry Lau
Hilcorp North Slope – Prudhoe Bay East
FS3 Operations Engineer (DS 06,07,13,14,15)
Cell: (907) 360-6233
Office: (907) 564-5280
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
TREE= 4-1/16"CM/5K
WELLHEAD=
FMC
ACTUATOR=
BAKER
OKB. ELEV =
6625'
BF. ELEV =
32.97'
KOP =
1450'
Max Angle =
94" 0 11580'
Datum MD =
WA
Datum TVD =
8800' SS
10-3/4" CSG, 45.5#, L-80, D = 9.953"
1 39'
9-518" CSG, 47#, L-80, D = 8.681" I --i 3964'
Minimum ID =.255'@ 10400'
2-3/8" POLAR CHOKE ASSY
15-41 B
13-1/2' TBG, 9.2#, FOX 13 -CR -80, ID = 2.992"10148' —
SAFETY NOTES: DURING RIND THE 3-12" UNIQUE
OVERSHOT WAS SPACED OUT TO SWALLOW 3-
12" TBG STUB @ 10170'. DEPTH DISCREPANCY
DUE TO E -LINE VS RIG MEASUREMENT.
3-12" NORTHERN SOLUTIONS CBP (052123) 14 10208' —
3-12" TBG. 92#. L-80..0087 bnf. D = 2.992'
7' CSG, 280, LSO, D = 8276' 10438'
PERFORATION SUMMARY
FIEF LOG: SVS MCNL GR(COL ON 10/08/01
ANGLEAT TOP PERF: 11'@ 10137'
Note: Refer to Production DB for historical perf data
SIZE
SPF
INTERVAL
Opn/Sgz
DATE
2-12"
6
10137 - 10192
O
12/13/04
2-114"
6
10225 - 10260
O
11/04/04
1-11/16"
4
12040 - 12363
O
10/09/01
1-11116"
4
12401 - 12704
O
10109/01
1-11116"
4
12714 - 12720
O
10109/01
5" LNR, 15#, 13-0R30, ID = 4.408" 11150'
SAFETY NOTES: WELL ANGLE > 700 @ 10970'& > 900
@ 11169'. NOTE NO SSSVN / LANDING NIP WERE
RUN @ THE NORMAL +/- 2000' DEPTH. NOTE: DRIFT
RESTRICTION THRU TOL, 1-11/16" LOGGING TOOLS
WOULDN'T PASS 05/23/03 - CHROME LNR & TBG
101' 4-1/2" X 3-12" TBG XO, D = 2.992"
u O Ur i "
mur¢w
DATE
ST
MD
TVD
DEV TYPE
VLV
LATCH
PORT
DATE
1
3595
3315
48 CA-FMHO
DMY
RK
0
10104/22
2
6764
5399
53 CA-FMHO
DMY
RK
0
1010422
3
9143
7047
30 CA-FMHO
"DMY
RK
0
032423
4
10026
7871
11 CA-FMHO
DMY
RK
0
05/11/06
'STA #3 = FREUDENBERG PACKING
10120' 1--17"X 4-12" BAKER S-3 PKR, D = 3.875"
101�—ICHEM Ct1T TBG STUB I12/23/00
10174' 3-1/2" UNIQUE OVERSHOT, D=3.625"
10187' TOC PLUG (052123)
10195' 3-12" X 4-12" XO, ID = 2.992'
10198' 7' X 4-12' BAKER SABL.3 PKR, D = 3.875'
10202' 4-12" X 342" XO, ID = 2.992"
10233' 3-12" OTIS X NIP. ID = 2.813"
10255' --� 3-12' PARKER SWN NP. D =2.750' 1
1 10269' 1--13-12"Tr WLEG
102830 —12.70"BKR DEPLOYMENT SLV, ID=2.250"
10318' 2-3/8' CBP (032323)
10400' 23/8" N.S. POLAR CHOKE w/.25'
5" SIDETRACK WINDOW ( 15-41B )
10695' - 10705' ( OFF CML RAMP)
15-41
RK
WELLBO RE -OT SH WN O
WELLBORE NOT SHOWN ON THIS
\ DIAGRAM
2-3/8" LNR, 4.7#, L-80, .0039 bpf, D = 1.995" I 12777'
DATE
REV BY COMMENTS
DATE
REV BY COMMENTS
11/12194
ORIGINAL COMPLETION
10/1922
JPK/JMD GLV C/O(1010422)
0810994
RWO
10/1922
CK/JMD SET PX PLUG (1010222)
0110491
RWO
04/1023
SS/JMD GLV C/O (03/24)23)
03105101
ABORTED SIDETRACK
04/1023
SS/JMD RESET PX PLUG &
10109101
CTD SIDETRACK
05/1523
SWS/JMD PULLED PX PLUG (05/1223)
0710621
CP/JMD RESET POLAR CHOKE (01
052223
RB/JMD SET CBP& CMT ON PLUG(052123)
PRUDHOE BAY UNIT
WELL: 15-41B
PERMIT No '2011460
API No: 50-029-22492-02
SEC 22, T11 N. R14E. 1474' SNL & 4566' FEL
Hilcorp North Slope, LLC
From:Ryan Holt
To:Jerry Lau
Subject:FW: NOT OPERABLE: Producer 15-41B (PTD #2011460) MIT-T failed
Date:Friday, May 26, 2023 11:51:57 AM
Also for reference, this is the email chain we sent Jim on 15-41 making it under eval / not operable
last year.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
P: (907) 659-5102
M: (907) 232-1005
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Wednesday, October 5, 2022 5:55 AM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York
<byork@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Subject: NOT OPERABLE: Producer 15-41B (PTD #2011460) MIT-T failed
Mr. Regg,
Slickline set DGLVs on 09/26/22 but a subsequent TIFL failed. On 10/04/22 Slickline set a TTP,
performed a passing CMIT-TxIA but a failing MIT-T. The failed MIT-T indicates a failure in the primary
well barrier. The well is now classified as NOT OPERABLE and will remain secured with a TTP.
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity
andrew.ogg@hilcorp.com
P: (907) 659-5102
M: (307)399-3816
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Wednesday, September 28, 2022 1:02 PM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York
<byork@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Subject: UNDER EVALUATION: Producer 15-41B (PTD #2011460) TIFL Failed
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU 15-41B
Isolate Pools
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
201-146
50-029-22492-02-00
12777
Conductor
Surface
Intermediate
Liner
Liner
8800
80
3925
10406
425
2512
10098
20"
9-5/8"
7"
5"
2-3/8"
7942
36 - 116
39 - 3964
32 - 10438
10270 - 10695
10265 - 12777
36 - 116
39 - 3558
32 - 8276
8111 - 8529
8106 - 8800
none
470
4760
5410
7250
11780
10098 , 10312
1490
6870
7240
8290
11200
10137 - 12720
3-1/2" 9.2# 13Cr80 30 - 10281
7980 - 8798
Structural
4-1/2" Baker S-3 , 10120 , 7963 No SSSV
10120 , 10210
7963 , 8052
Bo York
Operations Manager
Jerry Lau
Jerry.Lau@hilcorp.com
907-564-5280
PRUDHOE BAY, PRUDHOE OIL / PUT RIVER OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028306
30 - 8122
48
0
5865
0
2
0
0
0
251
0
N/A
13b. Pools active after work:N/A
4-1/2" Baker SABL-3 , 10210 , 8052
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Kayla Junke at 3:32 pm, Apr 17, 2023
Digitally signed by Bo York (1248)
DN: cn=Bo York (1248), ou=Users
Date: 2023.04.13 21:58:46 -08'00'
DSR-4/17/23
RBDMS JSB 042023
WCB 11-28-2023
ACTIVITYDATE SUMMARY
3/22/2023
TFS U3 (Assist Slickline w/ Load and Test) Standby for slickline to finish wellwork
***Job continues to 3-23-23***
3/22/2023
***WELL S/I ON ARRIVAL***
PULLED PX PRONG FROM 10098' MD
BAILED FILL FROM PX PLUG BODY 10098' MD
***CONTINUE ON 3/23/23***
3/23/2023
*** CONTINUE FROM 3/22/2023 ***
RUN VARIOUS BAILERS THROUGH STICKY SPOT FROM 8,840' - 9,200' SLM
RUN 2.0" & 2.25" PUMP BAILER DOWN TO PX PLUG BODY @ 10,084' SLM
(10,098' MD)
PULLED 3-1/2" PX-PLUG BODY FROM 10,095' SLM / 10,098' MD
RAN 3' x 1-7/8" BULLNOSE (1.84" OD), FOR CIBP DRIFT TO 10,341" SLM.
RAN 3-1/2" BLB, 2.72" G-RING TO 10,276' SLM / 10,283' MD,
SET 2-3/8" CIBP @ 10,312' SLM / 10,319' MD
SET 3-1/2" PX-PLUG BODY & PRONG @ 10,095' SLM / 10,098' MD
SET WHIDDON CATCHER @ 10092' SLM
*** CONTINUE ON 3/24/2023 ***
3/23/2023
T/I/O = 1100/670/260. Temp = SI. T FL (SLB req). T FL @ 444' (3151' above sta #1
DMY).
WV = C. SV, SSV, MV = O. IA, OA = OTG. 20:00.
3/23/2023
***Job continued from 3-22-23*** TFS U3 (Assist Slickline w/ Load and Test)
Pumped 1 bbls of 60/40, followed by 133 bbls KCL Followed by 22 bbls Crude to load
well and freeze protect for slickline ***Job continues to 3-24-23***
3/24/2023
*** Job continued from 3-23-2023 *** TFS U3 (Assist slickline w/load and test)
****CMIT TxIA PASS**** @ 2700/2700/300 Pumped 5.7 bbls crude to reach test
pressure, Bled 2.8 bbls back from IA. ****MIT T FAIL**** 2000/1450/300
Pumped 2.8 bbls down TBG to reach test pressure, Bled back2.6 bbls Tags Hung
Well left in Pollard SL control upon departure FWHP= 1300/1000/300
3/24/2023
*** CONTINUE FROM 3/23/2023 ***
RAN 3.- 1/2" OM-1, 7" EXT, 1 -5/8" JD TO 9,145' SLM ATTEMPT TO PULL ST #3
(SHEAR OFF)
RAN 3.- 1/2" OM-1, 7" EXT, 1 -5/8" JD TO 9,145' SLM ATTEMPT TO PULL ST #3
(CHUCKED DOGS)
PULLED ST# 3 RK-DMY GLV FROM 9,145' SLM / 9,143' MD
SET RK-DMY GLV IN ST# 3 @ 9,145' SLM / 9,143' MD
T-BIRD PERFORM PASSING CMIT-TxIA.
T-BIRD PERFORM FALLING MIT-T
PULL 3-1/2" WHIDDON CATCHER FROM 10,092' SLM
***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED***
Daily Report of Well Operations
PBU 15-41B
The CIBP is correctly shown on the new WBS, below. -WCB
SET 2-3/8" CIBP @ 10,312' SLM / 10,319' MD
Mr. Regg,
Producer 15-41 (PTD #2011460) is currently Under Evaluation after it failed a diagnostic TIFL on
09/20/22. On 09/26/22 after Slickline set the DGLV, the well exceeded MOASP on the IA. A
subsequent TIFL failed which verifies the excursion was sustained casing pressure. This email is to
satisfy reporting requirements outlined in CO 492.
Plan Forward:
1. Slickline: Set TTP/Perform MITs
2. Well Integrity: Additional diagnostics as needed
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity
andrew.ogg@hilcorp.com
P: (907) 659-5102
M: (307)399-3816
From: PB Wells Integrity
Sent: Tuesday, September 20, 2022 3:33 PM
To: Alaska JMS User <akimsuser@hilcorp.com>; Carrie Janowski <Carrie.Janowski@hilcorp.com>; PB
EOC Specialists <PBEOCSpecialists@hilcorp.com>; PB Wells Optimization Engineers
<PBWellsOptimizationEngineers@hilcorp.com>; PBE FS3 Drill Sites
<FS3DrillsitesFS3Drillsites@hilcorp.com>; PBE FS3 Field Lead Operator
<PBEFS3FieldLeadOperator@hilcorp.com>; PBE FS3 Foreman <PBEFS3Foreman@hilcorp.com>; Eric
Dickerman <Eric.Dickerman@hilcorp.com>
Cc: Bo York <byork@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio - (C)
<John.Condio@hilcorp.com>; Kevin Brackett <Kevin.Brackett@hilcorp.com>
Subject: UNDER EVALUATION: Producer 15-41B (PTD #201146) TIFL Failed
All,
Producer 15-41B (PTD #201146) was reported by operations with increasing IA pressure.
Subsequent warm TIFL failed on 06/20/22 which verifies failure of one or more well barriers. At this
time, the well is now classified as UNDER EVALUATION and on a 28 day clock to be resolved.
Plan Forward:
1. Slickline: Set DGLV
2. DHD: Re-TIFL
Please call with any questions or concerns.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
P: (907) 659-5102
M: (907) 232-1005
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
You don't often get email from jerry.lau@hilcorp.com. Learn why this is important
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
From:Roby, David S (OGC)
To:Jerry Lau
Subject:[EXTERNAL] RE: DS 15-41B Western Put River Production Question (PTD#201-146)
Date:Wednesday, May 10, 2023 3:01:03 PM
Attachments:image001.png
Hi Jerry,
This looks acceptable.
Regards,
Dave Roby
(907)793-1232
From: Jerry Lau <Jerry.Lau@hilcorp.com>
Sent: Tuesday, May 9, 2023 1:43 PM
To: Roby, David S (OGC) <dave.roby@alaska.gov>
Subject: DS 15-41B Western Put River Production Question (PTD#201-146)
Dave,
I’m starting to plan a Frac job on 15-41B. This is a well that historically comingled the Ivishak and Put
River Lobes under a waiver agreement, which has since expired. The well currently has the Ivishak
isolated and in near term will have another plug isolating the two Put River lobes from each other.
Does the AOGCC see any compliance issues with our plan below?:
Isolate each zone per annotated schematic below.
Frac and produce the Western Put River (upper lobe, 10,137’-10,192).
Once Western Put River production falls off:
Renew comingling waiver of Western Put, Central Put, and Ivishak
Mill out all plugs and comingle/produce all pools.
My team could not identify any regulatory and compliance issues with the plan, but we feel more
comfortable checking with you first.
Please reach out with any questions or concerns.
Thanks
Jerry Lau
Hilcorp North Slope – Prudhoe Bay East
FS3 Operations Engineer (DS 06,07,13,14,15)
Cell: (907) 360-6233
Office: (907) 564-5280
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
Samuel Gebert Hilcorp North Slope, LLC
GeoTechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
Fax: 907 777-8510
E-mail: sam.gebert@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510
Received By: Date:
DATE: 03/15/2021
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
PBU 15-41B (PTD 201-146)
PPROF INTERPRETATION REPORT 02/13/2021
Please include current contact information if different from above.
PTD: 2011460
E-Set: 34780
Received by the AOGCC 03/15/2021
03/15/2021
Samuel Gebert Hilcorp North Slope, LLC
GeoTechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
Fax: 907 777-8510
E-mail: sam.gebert@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510
Received By: Date:
DATE : 02/22/2021
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
PBU 15-41B (PTD 201 -146)
PPROF 02/13/2021
Please include current contact information if different from above.
PTD: 2011460
E-Set: 34754
Received by the AOGCC 03/08/2021
03/09/2021
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS SCP t i 20S
Form 10-404 Revisetl 04/2017 /�/� K('„�Qt� "'�6 ;gDMS SL." L'/�J Submit Original Only
1. Operations Performed
,,,///'''ppp
Abandon ❑ Plug Perforations 11Fracture Stimulate ❑ Pull Tubing 11Operations s�u((1`r�
Suspend Perforate 11Other Stimulate ❑ Alter Casing C1Change Ap rove r ❑
Other: Commingle Put River
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ and Ivishak- Pull ISPs R1
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development Rl Exploratory ❑
5. Permit to Drill Number: 201-146
3. Address: P.O. Box 196612 Anchorage,
AK 99519-6612
Stratigraphic ❑ Service
6. API Number: 50-029-22492-02-00
7. Property Designation (Lease Number): ADL 028306
e. Wyll Name and Number: PBU 1541B
9. Logs (List logs and submit electronic and pnnted data per 20AAC25.071):
10. Field/Pools:
PRUDHOE BAY. PUT RIVER OILIPRUDHOE BAY, PRUDHOE OI
11. Present Well Condition Summary:
Total Depth: measured 12777 feet Plugs measured None feet
true vertical 8800 feet Junk measured None feet
Effective Depth: measured 12742 feet Packer measured 10120 / 10210 feet
true vertical 8799 feet Packer true vertical 7963 / 8052 feet
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 36-116 36-116 1490 470
Surface 3929 10-3/4" x 9-5/8" 35-3964 35-3558 5210/6870 2480/4760
Intermediate 10406 7" 32-10438 32-8276 7240 5410
Liner 425 5" 10270 - 10695 8111-8529 8290 7250
Liner 2512 2-3/8" 10265 - 12777 8106-8800 11200 11780
Perforation Depth: Measured depth: 10137 - 12720 feet
True vertical depth: 7980-8798 feet
Tubing (size, grade, measured and true vertical depth) 3-1/2" 9.2#, 13Cr8o / L-80 30-10281 30-8122
4-1/2" BAKER S-3 HYDRO SET PACKER 10120 7963
Packers and SSSV (type, measured and 4-1/2" BAKER SABL-3 PACKER 10210
true vertical depth) 8052
NO SSSV INSTALLED
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13_ Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
126
2200
24
1482
289
Subsequent to operation:
958
15022
27
0
326
14. Attachments: (required per20 MC 25 070 2 5, 071, &25283)
15. Well Class after work:
Daily Report of Well Operations 0
Exploratory ❑ Development p Service ❑ Straligraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work. D
Oil Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge, Sundry Number or N/A if C.O. Exempt:
319-071
Authorized Name: Brown, Don L. Contact Name: Brown, Don L.
Authorized Title: Petroleum Engineer Contact Email: browd2ABP.com
Authorized Signature: a077 y /'Y) Date: Ct 1 Contact Phone:
119075644675
Form 10-404 Revisetl 04/2017 /�/� K('„�Qt� "'�6 ;gDMS SL." L'/�J Submit Original Only
Daily Report of Well Operations
PBU 15-41B
ACTI V ITYnATF
****WELL SHUT IN ON ARRIVAL****(profile modification)
RUN 2.25" CENT, 1-3/4" S BAILER TO 10,185' SLM (bailer full of paraffin)
RUN 10'x 2.25" PUMP BAILER W/ mule shoe ball bottom TO 10,185' SLM.(bailer & tools full of
sticky asphaltine/paraffin)
RUN 2' 1-7/8" STEM, 2.78" BLIND BOX TO 8225' SLM (unable to pass) ****FL @ 5100' SLM****
4/10/2019
****CONT WSR ON 4-11-19****
****CONT WSR FROM 4-10-19****(profile MOD)
RUN KJ, 2.25" CENT, 15'x 1.75" DRIVE DOWN BAILER TO 10,184' SLM (1/2 gal recovered)
RUN KJ, 10'x 2.25" PUMP BAILER w/ mule shoe ball bottom TO 10,189' SLM
R/D DUE TO WEATHER
4/11/2019
***WELL LEFT S/I, DSO NOTIFIED ON DEPARTURE***
***WELL S/I ON ARRIVAL & CONTINUE JOB FROM 4/11/19 SWCP 4518***(profile mod)
RAN 2.25" x 10' PUMP BAILER TO 10,190' SLM.
4/14/2019
***CONTINUE WSR TO 4/15/19***
***CONTINUE WSR FROM 4/14/19 SWCP 4518***(profile mod)
MADE 6 BAILER RUN'S FROM 10,190' SLM TO 10,205' SLM.
4/15/2019
***CONTINUE WSR TO 4/16/19***
***CONTINUE WSR FROM 4/15/19 SWCP 4518***
MADE 2 BAILER RUNS FROM 10,205' SLM TO 10,211' SLM.
RAN 2.50" CENT, 2.30" LIB TO 10,211' SLM W/ GOOD IMPRESSION OF IBP.
RAN 2.50" PUMP BAILER W/IBP EQ FLAPPER BTM TO 10,215' SLM.
PULLED 2.13" IBP FROM 10,215' SLM.
MADE 2 RUNS W/ BRUSH, 2.72" WIRE GRAB TO DEPLOY SLV @ 10,265' SLM (10212' ELMD)
& RECOVERED TWO BIG PIECES OF ELEMENTS.
4/16/2019
***CONTINUE WSR TO 4/17/19***
***CONTINUE WSR FROM 4/16/19 SWCP 4518***(profile mod)
RAN 1.75" CENT, 1.50" LIB TO 10,490' SLM IMPRESSION OF DEPLOY SLV & FILL.
MADE 3 RUNS W/ 1.75" x 10' PUMP BAILER FROM 10,490' SLM TO 10,495' SLM.
RAN IBP EQ SLV W/TATTLE TALE PIN TO IBP @ 10,495' SLM (pressure change).
MADE 3 ATTEMPTS TO PULL IBP(1 hr of total jar time) FROM 10,495' SLM).
4/17/2019
***CONTINUE WSR TO 4/18/19***
***CONTINUE WSR FROM 4/17/19 SWCP 4518***(profile mod)
ATTEMPT TO PULL IBP FROM SID @ 10,479' SLM & UNABLE TO LATCH.
MADE 2 RUN W/ 1.75" x 10' PUMP BAILER TO @ 10,491' SLM.
ATTEMPT TO PULL IBP FROM 10,491' SLM(3hr's of jar time).
RAN 1.75" x 10' PUMP BAILER TO @ 10,491' SLM.
4/18/2019
***CONTINUE WSR TO 4/19/19***
***CONTINUE WSR FROM 4/18/19 SWCP 4518***(profile mad)
MADE (3) 10'x 1.75" PUMP BAILER RUNS TO 10,492' SLM.
DRIFT W/ 2.79" CENT TO 10,222' SLM W/ NO ISSUES.
ATTEMPT TO SET 3-1/2" IBP STOP SID HIGH @ 9604' SLM WORK TOOLS DOWN TO 9657'
SLM TOOL SHEARED & LEFT IBP STOP IN HOLE.
MADE 2 ATTEMPTS TO PULL IBP STOP FROM 9657' SLM UNABLE TO LATCH.
RAN 3-1/2" BRUSH & 2.805" G -RING FOR B&F SID ON IBP STOP @ 9663' SLM PUSH DOWN
TO 10,073' SLM.
IN
HOLE W/ 10'x 2.5" PUMP BAILER.
4/19/2019
***CONTINUE WSR TO 4/10/19***
Daily Report of Well Operations
PBU 15-41B
***CONTINUE WSR FROM 4119119 SWCP 4518***(profile mod)
PULLED IBP STOP FROM 10,085' SLM (10,098' MD)
RAN 2.805" G-RING, 3 1/2" BLB, BRUSHED X-NIP @ 10,098' MD, TAG DEP SLV @ 10,265' SLIM
SET 3 1/2" IBP STOP @ 10,085' SLM (10,098' MD)
RAN 3 1/2" CHECK SET TO 10,085' SLM (sheared)
***WELL LEFT S/1 DSO NOTIFIED ON DEPARTURE***
**IBP PULLING TOOL IS PLANTED ON IBP (SET 04/17/2019)***
4/20/2019
PULLED 3 1/2" IBP STOP FROM 10,085' SLM (10,098' MD)
PULLED IBP FROM 10,255' SLM. (IBP HAD MOVED UPHOLE AFTER ATTEMPT TO PULL IT
FROM 10515' APRIL 16-20).
RAN 3-1/2" BRUSH & 2.63" WIRE GRAB TO DEPLY SLV @ 10,267' SLIM NO RECOVERY.
RAN 1.75" TWO PRONG WIRE GRAB(WG-02) DEV OUT @ 10,997' SLIM NO RECOVERY.
6/13/2019
***WELL LEFT S/I ON DEPARTURE***
CTU #8 1.75" CT 0.156WT.
Objective: Xylene Treatment
MIRU. Standby for high winds. MU 2.75" DJN and drift. Drift to TOL at 10265ft.
8/2/2019
**In Progress"
CTU #8 1.75" CT 0.156WT.
Objective: Xylene Treatment
Continue POH w/ drift. MU & RIH w/ Latching Standing Valve. Sting into deployment sleeve but
could not release G spear. Drop 5/8" disconnect ball. POOH. RIH w/ 2" SJN.
**NOTE** Northern Solutions Standing Valve Snap latch left in hole in TOL at 10265' - pinned to
7500lbs to release. Also left Baker disconnect from MHA. CAL - 17.77'
8/3/2019
**In Progress'
CTU #8 1.75" CT 0.156WT.
Objective: Xylene Treatment
Continue to RIH w/ 2" SJN. Pump 140dF crude down IA (125bbis). Jet diesel across perfs. Pump
80bbls of 50/50 diesel/xylene & jet across perfs. Lay in diesel/xylene to —1800'. LD tools. RDMOL.
8/4/2019
**Job Complete**
***WELL S/I ON ARRIVAL***(profile mod)
RAN 2.60" CENT & 2.50" LIB TO 10,250' SLM. CLEAN IMPRESSION OF TOP OF COIL FISH.
8/13/2019
***CONT ON 8-14-19 WSR***
***CONT FROM 8-13-19 WSR***(profile mod)
FISHED COIL TOOLS (17.7') FROM LINER TOP AT 10,265' MD.
SET 3-1/2" DOWNHOLE CHOKE ASSY(16/64") IN X-NIPPLE @ 10,245' MD.
CONFIRMED GOOD SET W/ 3-1/2" CHECK SET.(sheared)
8/14/2019
***WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS***
LRS Well Test Unit 1. Begin WSR on 8/16119. Xylene Flowback / Well Test. MIRU, PT Hard line. IL
8/16/2019
Well 15-41 OL Well 15-36. Continue WSR on 8/17/19
LRS Well Test Unit 1. Continue WSR from 8/16/19. Xylene Flowback /Well Test, Complete PT,
8/17/2019
POP well to portable separator. IL Well 15-41 OL Well 15-36. Continue WSR on 8/18/19
LRS Well Test Unit 1. Continue WSR from 8/17/19. Xylene Flowback / Well Test. Start 18Hr Well
8/18/2019
Test, End 18Hr Well Test. IL Well 15-41 OL Well 15-36. Continue WSR on 8/19/19
LRS Well Test Unit 1. Continue WSR from 8/18/19. Xylene Flowback / Well Test. Start 18Hr Piggy
Back Well Test, End 18Hr piggy
back Test. Begin Blow Down and Rig down. IL Well 15-41 OL Well 15-36. Continue WSR on
8/19/2019
8/20/19
LRS Well Test Unit 1. Continue WSR from 8/19/19. Xylene Flowback / Well Test. Rig Down. IL Well
8/20/2019
15-41 OL Well 15-36. Job Complete, End WSR on 8/20/19
TREE= 4-1/16"CNV 5K
1 39'
9-5/8" CSG, 474, L-80, D = 8.681" 1-� 39W
Minimum ID = .25" @ 10245'
3-1/2" X LOCK W/ CHOKE ASSY
3-12^ TBG, 9.2#, FOX 13 -CR -80, D = 2.992' 10148'
SAFEfYNOTES: DURINGRWOTHE 3-12"UNIQUE
OVERSHOT WAS SPACED OUT TO SWALLOW 3-
12" TBG STIR @ 10170'. DEPTH DISCREPANCY
DUE TO E4JNE VS RIG MEASUREMENT.
3-12" X LOCK xd CHOKE ASSY, D = 25" (8/14/19) 1
TOP OF 2-3/8" 4J#, STL LNR, D = 1.995'10268'
3-12"
1 10280' 1
7" CSG, 26#, L-80, D = 6276" 10438'
15-41 B SAFETY NOTES: WELL ANGLE> 70" @ 10970' & > 90"
11169'. NOTE NO SSSVN / LANDING NIP WERE
RUN @ THE NORMAL +/- 2000' DEPTH. NOTE DRIFT
RESTRICTION THRU TOL, 1-11116" LOGGING TOOLS
WOULDN'T PASS 05/23/03 - CHROME LNR & TBG
PERFORATION SLRAMRY
REF LOG: SM MCPL GR/CCL ON 10/08/01
ANGLE AT TOP PUT 11^Q 10137'
Note: Refer to Production DB for historical pert data
SEE
SPF
INTERVAL
Opn/Sgz
DATE
2-1/2"
6
10137- 10192
O
12/13/04
2-1/4"
6
10225-10260
O
11/04/04
1-11/16"
4
12040-12363
O
10/09/01
1-11/16"
4
12401 - 12704
0
10/09/01
1-11/16"
4
12714 - 12720
0
10/09/01
5" LNR, 15#, 13 -CR -80, D=4.408" 11150'
101' J -14-i/2" X 3-1/2' TBG XO, ID
GAS LFT M4MM C
ST
M)
10245'
3-1/2" OTIS X NP, D = 2.813"
10265'
VLV
LATCH
PORT
DATE
1
3595
10276'
ELMD TT LOGGED 09/12101
10
DO
RK
16
07!13/18
2
6764
M30C0k-FMFK)
iD
SO
RK
20
07/13/18
3
9143
K)
DMY
R<
0
05/11/064
10026
O
DMY
RK
0
05/11/06
2.813"
10120' �-17X4-1/2"BAKB2 S-3 PKR, ID=
10145' 3-12" H� X NP, D = 2.813"
10170' CHEM cur TBG STUB - 1223/00
10174' 3-12" UNIQUE OVERSHOT, ID=',
10207' H 3-1/2" X 4-12" XO, ID = 2.992"
10210' H7- X 4-12" BAKER SABL-3 PM
10214'
4-1l2" x 3-12" XO, ID = 2.992"
10245'
3-1/2" OTIS X NP, D = 2.813"
10265'
2.70"BKR DEPLOYMENT SLV,D
10267
312"PARKERSWN NP, D=2.7
10270'
7" X 5' TNV LNR/R)GRIPKR
10281' 3-12^ Ti WLEG
10276'
ELMD TT LOGGED 09/12101
10515' 1
1.69" BAKER BP SET 10/20/04
5" SIDETRACK WH)OW ( 15-418 )
10695' - 10705' ( OFF CMF RAMP)
' NOTE PRE -15418 SDTRK
WELLBORE NOT SHOWN ON THS
\ DIAGRAM
12-3/13- LNR 4.7#, L-80_0039 bpf, D= 1.995^ 1
PRUDHOE BAY UNIT
WELL: 15416
PERMrr ND: 2011460
API No: 50-029-22492-02
TI IN, R14E. 1474' SNL 84561
BP Exploration (AFbska)
BY COMMENTS
DATE
REV BY
COMMENTS
ORIGINAL COMPLETION
04/22/19
B/JMD
PULL BP/SETBP STOP(0420/19)
RWO
0621/19
RB/JMD
PULLED BP STOP & BOT BP (06113/19)
PDATEREV
RWO
O8/OB/19
MRlJMD
FISH DH (08/03/19)
ABORTED SIDETRACK0821/19
MTWJMD
SET DH CHOKE ASSYMULLED FISH
CTD SIDETRACK
DD/JMD ADDED OKB B BF ELEV
PRUDHOE BAY UNIT
WELL: 15416
PERMrr ND: 2011460
API No: 50-029-22492-02
TI IN, R14E. 1474' SNL 84561
BP Exploration (AFbska)
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Paulina Meixueiro
Production Engineer
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 15-41B
Permit to Drill Number: 201-146
Sundry Number: 319-071
Dear Ms. Meixueiro:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fox: 907.276.7542
v✓wve. aogcc.aloska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by.4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this day of February, 2019.
6 ti 0'1019
RBDMsS`�
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
"U--ULIVD
FEB s � -n?c
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations Shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑
Plug for Redrill I] Perforate New Pool Other: Commingle Put River C1
❑ Re-enter Sul Well ❑ Alter Casing ❑ and lvishak - Pull IBPs
2, Operator Name: SP Exploration (Alaska), Inc
4. Current Well Class:
Exploratory ❑ Development 0
5. Permit to Drill Number 201-146 a
3, Address: P.O. Box 196612 Anchorage, AK
6. API Number: 50-029-22492-02-00
99519-6612
Stra[igraphic ❑ Service ❑
7. If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
8. Well Name and Number:
Will planned perforations require a spacing exception? Yes ❑ No 0
PBU 1541B
9. Property Designation (Lease Number):
10. Field/Pools:
ADL 028306 1
PRUDHOE BAY. PUT RIVER OIUPRUDHOE BAY. PRUDHOE OIL
11, PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft):
Total Depth TVD(ft): Effective Depth MD' Effective Depth TVD:
MPSP (psi):
Plugs (MD): Junk
12777
8800 10212 8054
10212,10515 None
Casing
Length Size MD TVD
Burst Collapse
Structural
Conductor
80 20" 36-116 36-116
1490 470
Surface
3929 10-3/4" z 9-5/8" 35-3964 35-1...
5210 / 6870 2480/4780
Intermediate
10406 T' 32-10438 32-8276
7240 5410
Liner
425 5" 10270 - 10695 8111-8529
8290 7250
Liner
2512 2-3/8" 10265 - 12777 8106-8800
11200 11780
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
10137 - 12720
7980 - 8798
3-1/2" 9.2#
13Cr80 / L-80
1 30-10281
Packers and SSSV Type412" BAKER S-3 HYDRO SET PACKER
Packers and SSSV MD (ft) and TVD (ft): 10120 / 7963
412" BAKER SABL-3 PACKER
10210/8052
No SSSV Installed
Na SSSV installed
12. Attachments: Proposal Summary 0 Wellbore Schematic 0
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development p Service ❑
14. Estimated Date for Commencing Operations: 3/15/2019
15. Well Status after proposed work:
Oil 0 WINJ ❑ WDSPL ❑ Suspended ❑
16. Verbal Approval: Date:
GAS ❑ WAG 11GSTOR ❑ SPLUG ❑
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
Contact Name: Meixueiro, Pauline
be deviated from without prior written approval.
Authorized Name: Mail Pauline Contact Email: paulina.meixueiroobp.com
Contact Phone: +1 907 564 5971
Authorized Title: Production Engineer -
Authorized Signature:
— a.. -J,.. !.l•_�s... -c Date: 0413119
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: /)
Plug Integrity ❑ BOP Test ❑ Mechanical Integnty Test ❑ Location Clearance ❑
Other:
Post Initial Injection MIT Req'd? Yes ❑ No ❑I
/
Spacing Exception R wired? Yes ❑ No El Subsequent Form Required: /,0'ZJ� 4f
APPROVED BYTHE y
Approved by
COMMISSIONER COMMISSION Date:
ORIGINAL RBDMEB 2 0 2019
1•vt1-BIZ�Qi� Submit Form and
Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate
Q�t'/l1 5'x4.8. Lill
30-403 Sundry Application for Well PBU 15-41B PTD #201-146
Expected Start Date: March 15, 2019
Current condition of well: Production Well, Operable:
Gas Lift Rate:
3000 Mscf/Da
Flowing Tubing Pressure:
289 psi
Shut-in Wellhead Pressure:
2582 psi
Reservoirpressure:
4306 psi
Well History and Objective(s):
This well was selected for a Put River appraisal in DS15 back in 2004. The
Ivishak was isolated by setting an IBP at 10,515'MD. The lower Put River was
perforated from 10,225 -10,260' on 11/3/04. This lower lobe did not flow.
Following a CT hydrate cleanout, an IBP was set at 10,212' in 12/04. The upper
Put River was perforated from 10,137'— 10,192' on 12/13/04 and flowed with
average rates of 95 bopd with 3.6 mmcfd.
The objective of this program is to pull the IBP's to commingle Ivishak and Put .
River. A retrievable packer system in the 3-1/2" with a GLV so the Ivishak gas
can be used for in situ gas lift. A 16/64" port designed to allow —4 mmscfd
formation gas has been selected.
Proposed program: �/ s L /G)eZ 1,41C
1
2
3
4
5.
6.
7
B&F with HOT crude.
Drift to IBP with sample bailer. Bail to fill to clear fishing neck.
Pull Baker 2-1/2" IBP 10,212' MD as per manufacturer's specifications. ✓
Drift to IBP @ 10,515' MD with LIB to understand where are we sitting (fill or IBP
fishing neck). Send pictures to Pau lina.meixueirona bp.com and brownd2 a bp.com
Pull 1.69" Baker IBP 10,515' MD as per manufacturer's specifications
Tag TOL then pick up a foot to set the WFT Wide Pack packer 10,261' (mid
element) with 16/64" port orifice. (Contact Carl Diller / Bob Harris for details)
PBGL. Coordinate hardline rig up so PBGL can be used for KO.
BP Exploration (Alaska), Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
10-403 Sundry Application for Well PBU 15-41B PTD #201-146
Current Wellbore Schematic:
17741= 41/16'CIW5K
SAFETY No7NEOT WELL SANGLE>LN 1 7wERE90"
15-41 B @1115
RUN @ THE NORMAL N• 2000' DEPTH NOTE DWf
RESTRICTION TIRU TOL, 1-11110' LOGGING TOOLS
WOULOMT PASS 0523A3 -CHROME LNR& TBG
0.314- CSG, 4S Sk. '_ 80, U = 9 953- .'-y 39-
45x8' CSG, 47M, L-60. D = 8.681' -� 3964'
Minimum 10 - 1 A96^ � 10968'
!TOP OF 2-38" LNR
SAFETY NOTES: DURIGRWO THE 3 -12 -UNDUE
OVERSHOT WAS SPACE) OUT TO SWALLOW 3-
1 M- TBG STIR @ 10170'. DEPTH DISCREPANCY
OW TO ELME VS FOG MEASUREMENT.
!TOP OF 2-38' 4.74, STL LHR, C = 1.995' 10266'
13-12'1BG.924,1-80-.0087bpf,0=2.992' - 102811'
7 -(SG, 26%, L -M, D = 6216-
PEFSORATDNSLIAMARY
Ida LOG, Sm M. -FL C46UL ON VYD 1
ANGLEATTOPPOW il' W 10225
Noll. (tela to ReducBon CO (a l�bncal pert da.a
SEE
SWI 9418iVAL
OpNSgz
MTF
2-112'
6 10137-10192
C
12113/04
2 1N'
6 10225 10260
C
11IOM04
1-11A
4 112010-12363
C
10109'01
1 11116•
4 12401 12704
C
10/0931
L1 V16'
d 12714-197M
C
tONW01
03105/01
0=4.40S'
FAM,! 11
r -AC I FT MMN1YdA C
S-
MD
I TVD
DEV I
TYFE
IVLV
I LATCH
PORT
MTF
1
3595
W15
48
OOMP
w
16
07!13!19
2
6766
53M
53
CA -FMD
SOI
w
20
07;13+19
3
9143
7017
�CA-FMD
30
CA -FMD
OMfY
RK
0
05/11!06
4
10026
7871
11
CA -FMD
OMP
TM
0
05111!06
10170• r -i r X 4-v2. OAKLR S-3 wA C =
10146'H11,2•HESXNP,D=2.613-
10170' -!CHEM CUT TSG STUB -12123100
_-
10174' H3-tr[•'.1FiouE ovasHDT,D=:
___-_
10217 H2-1i2'BAKER BP SET I2/11A1
XS?14
Vw uM W, u=4.a1S
� 10616' 189'BAKBT BPSEf 102004
V SDETRACK VITDOW ( 15 41 El)
10696 10705' (OFFCMRRAMP)
- 137E PRE-15-41BSDRM
1'VWJA *1 IDI SHD GNles
\ UAGNAM
FOTO12742'
BP Exploration (Alaska), Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
TO" DE BAY LINT
W LL 15-416
POW W. 2011460
An No: 50-62422492-02
T11N R14E 1474' SNL 84566' FEL
BP EaploraUon (Alaska(
10-403 Sundry Application for Well PBU 15-41B PTD #201-146
Proposed Wellbore Schematic:
I HFV
EUV=
PROPOSED 15-41 B
= 4'R
Minimum ID 1.996" @ 10268'
TpP OF 2_3; L
SAFETY NOTES: DURDIGRWO TW 3-12-UNKRE
OVERSHOT WAS SPACED OUT TO SWALLOW 3-
12- TBLT STUB G 10170'. DEPTH DMCREPANCY
DUE TO E4JNE VS RIG MFASUREWNT.
PEWORATDNSUI&MRH
REF LOG SWE MDL GFVCQ- ON 180501
ANGLEATTOPFURF IT 010226
ML Mfw W PMd.c 08 Far A W6a1 Pert dah
SQE
SFF BLFHNAL
OpNSgz
DATE
2-i!6'
6 10137- 10192
C
17/1314
2-11P
6 1(225 10760
C
11104!01
1-11!16'
4 1240- 12363
C
10109701
1-11116'
4 12401- 1214
C
10'09'01
1-11116'
4 12714-12720
C
10109'01
SAFETY NOTES: WELL ANGLE a 70'@ 10970' 8 r 90' I
@11169'. NDTE NO SSSVNILANDINGMPWERE
WJN@ THE NORMAL H- 2000' DEPTH NOTE DRIFT
RESTRICTION THRU TOL, 1-11116" LOGGINGTOOLS
WOULDN'T PASS 0523A3 -CHROME LNR6 TBC
GS LFT MONDFFIS
ST
No
ITVDjDEVj
TYPE
JVLVILATCHIPOFITJ
11H2104 GMGNYIL COMPLEM 100L15 ADIJAD SET PA FLUS(0929115)
elivow Faw 07/17118 DLGIJMT RLILFLUGSETBPST0Pw1FLO%1 H87
DATE
1
3595
CTD910EFRACK
48
G-f#6O
RP BgADraUw (Abwkai
F6L
18
2
6764
5399
53
G -FMD
SO
W
20
/13/18
3
9U3
J3315
7047
30
G -FMD
DRAY
W
0
�007
05111816
4
10026
7971
11
G -IABD
OM1'
RK
0
05'11/06
X( 12'%Ll D=2 Wr
5- SIDETRACKNH70'N (15-418)
1WW 10705' (OFFAAt MAP)
FOIE PRE-15418SOTRK
W81801E1DTSHWWONTHS
\ 04AGRAM
0=]875'
BP Exploration (Alaska), Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
RLDFDE BAY LM
WBL: 15-418
PERMTM: 2011460
ARM: 54029-22492-02
SEC 22, 71 IN, R14E 1474'SAL 64586 FEL
I
DATE REV BY I OOMAAN 9 H DATE I REV BY I OOMVENTS
11H2104 GMGNYIL COMPLEM 100L15 ADIJAD SET PA FLUS(0929115)
elivow Faw 07/17118 DLGIJMT RLILFLUGSETBPST0Pw1FLO%1 H87
011HM1 FIWO 07!17118 CLGIJAD CLV C00 (07113t19)
69!05101 ABOFITDSWEFRACK MIN18 2VIJIID FLLLrD ROW THW SLAI (09111118)
10100101
CTD910EFRACK
118)W18
MAD ADDED00380FELEL
RP BgADraUw (Abwkai
05119106 KSB7RH GLV CK1105111A6)
BP Exploration (Alaska), Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
~~
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
January 1, 2010
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7t" Avenue ~ ~ I
Anchorage, Alaska 99501 / Jf. "_ ~,
Subject: Corrosion Inhibitor Treatments of GPB DS 15
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS
15 that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
DS-15
natP~ (11/5/10
t
Well Name
PTD #
API #
Initial top of
cement
VoI. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
15-01B 2042570 50029206960200- NA Sealed NA
15-02B 2060720 50029206970200 NA Sealed NA
15-03 1820300 50029207220000 NA Sealed NA
15-048 2071380 50029207260200 NA Sealed NA
15-05A 1950340 50029207310100 NA Sealed NA
15-06A 1982540 50029207420100 NA 6.7 NA 40.8 11/7/2009
15-07C 2030970 50029211660300 NA 5 NA 34.0 11/10/2009
15-08C 2050050 50029211800300 NA 6.5 NA 45.9 11/28/2009
15-09A 1931380 50029212010100 NA 0.9 NA 5.1 11/11/2009
15-10A 1880850 50029205010100 NA Sealed NA
15-11 B 2041460 50029206530200 NA Sealed NA
15-126 2060870 50029206650200 NA Sealed NA
15-13A 1991240 50029206450100 NA Sealed NA
15-14A 2042220 50029206820100 NA Sealed NA
15-15C 2081820 50029206910300 NA Sealed NA
15-16A 2011920 50029211150100 NA 0.3 NA 3.4 11/7/2009
15-17 1840890 50029211260000 NA 14.7 NA 132.6 12/4/2009
15-18A 2080830 50029222740100 NA 0.4 NA 1.7 11/11/2009
15-19A 1990990 50029218290100 NA surface NA
15-20C 2050930 50029211330300 NA 17 NA 120.7 12/2/2009
15-21A 1990290 50029205030100 NA Sealed NA
15-22 1800970 50029205090000 NA Sealed NA
15-23A 2031110 50029222250100 NA 0.7 NA 3.4 10/7/2009
15-24 1911280 50029222230000 NA 1.3 NA 10.2 10/7/2009
15-25B 2080240 50029218420200 NA 0.8 NA 6.8 11/12/2009
15-26B 2041590 50029222350200 NA 0.3 NA 1.7 10/8/2009
15-27 1920060 50029222430000 NA 0.3 NA 1.7 10/8/2009
15-28A 2031240 50029222470100 NA 0.5 NA 8.5 11/9/2009
15-29B 2090380 50029222590200 NA 0.1 NA 1.7 11/10/2009
15-30A 2020890 50029222820100 NA 0.8 NA 5.1 11/11/2009
15-318 2050860 50029222850200 NA 1.2 NA 3.4 11/11/2009
15-32A 2011840 50029224620100 NA 1.5 NA 10.2 10/7/2009
15-336 2031940 50029224480200 NA 1.6 NA 10.2 11/29/2009
15-34A 2001370 50029224740100 NA 1.4 NA 8.5 11/10/2009
15-35 1940880 50029224880000 NA 1.8 NA 15.3 11/10/2009
15-36B 2060730 50029224800200 NA 1 NA 5.1 11/10/2009
15-37B 2040190 50029224850200 NA 1.3 NA 10.2 11/9/2009
15-38A 2030160 50029224960100 NA Sealed NA
15-39A 2060860 50029225030100 NA 0.3 NA 1.7 11 /9/2009
15-40A 1980980 50029225110100 NA 1 NA 5.1 11(9/2009
15-418 2011460 50029224920200 NA 1.2 NA 6.8 11/9/2009
15-428 2090730 50029226240200 NA 1.5 NA 11.9 11/11/2009
15-44 1961100 50029226830000 NA 3.5 NA 30.6 12/17/2009
15-458 2071790 50029226710200 NA 1.7 NA 11.9 11/8/2009
15-46 2041030 50029226650000 NA 1.9 NA 17.0 11/9/2009
15-47 1951740 50029226170000 NA 1.5 NA 10.2 10/9/2009
15-48B 2051660 50029226350200 NA 1.2 NA 10.2 10/8/2009
15-49B 2090640 50029226510200 NA 7.3 NA 51.0 11/8/2009
.
.
"~ .,..'........
- ...... "
~ ..
..
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFichc\CvrPgs _ Inserts\Microfilm _ Marker.doc
_.) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSIRECEIVE
REPORT OF SUNDRY WELL OPERAT~gn~ 7nn,
1. Operations Performed:
Abandon D
Alter Casing D
Change Approved Program D
StimWIp-te~'1 o. C ¡O, Otherr.1
RUGS I ~ ails. lJomrmsSKm
Waiver Am;ho1ilijJè Extension D
Re-enter Suspended Well D
5. Permit to Drill Number:
201-1460
6. API Number
50-029-22492-02-00
12. Stimulation or cement squeeze summary:
Intervals treated (measured): .
Treatment descriptions including volumes used and final pressure:
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
16.2 4 700
16.6 4 975
Repair Well 0 PluQ Perforations[K]
Pull Tubing 0 Perforate New Pool D
Operation Shutdown 0 Perforate ŒJ
2. Operator
Name:
3. Address:
66.25
8. Property Designation:
ADL-0028306
11. Present Well Condition Summary:
4. Current Well Class:
Development Œ]
Stratigraphic D
9. Well Name and Number:
15-41 B
10. Field/Pool(s):
Prudhoe Bay Field 1 Prudhoe Oil Pool
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
ExploratoryD
Service D
Total Depth
measured 12777 feet
true vertical 8799.9 feet
Plugs (measured)
Effective Depth
measured 10212 feet
true vertical 8054.0 feet
Junk (measured)
Casing Length Size
CONDUCTOR 80 20" 91.5# H-40
LINER 425 5" 15# 13CR80
LINER 2512 2-3/8 Inch 4.7 Lb L-8
PRODUCTION 10404 7 Inch 26 Lb L-80
SURFACE 4 10-3/4 Inch 45.5 Lb L
SURFACE 3925 9-518 Inch 47 Lb L-80
Measured depth: 10137 -10172,10172 -10192
MD TVD
36 116 36.0 - 116.0
10270 - 10695 8111.0 - 8529.3
10265 - 12777 8106.1 - 8799.9
34 - 10438 34.0 - 8276.3
35 39 35.0 - 39.0
39 - 3964 39.0 - 3558.1
True vertical depth: 7980.32 - 8014.72,8014.72 - 8034.36
TubinQ ( size, Qrade, and measured depth):
4-1/2" 12.6# 13Cr80
3-1/2" 9.2# 13Cr80
4-1/2" 12.6# 13Cr80
113
10118
10126
@ 30
@ 113
@ 10118
Packers & SSSV (type & measured depth):
4-1/2" Baker S-3 Hydro Set Packer @ 10270
4-1/2" Baker SABL-3 Packer @ 10120
5" TIW Top Packer @ 10210
SCANNr:D FED C 4 LOGS
13
Prior to well operation:
Subsequent to operation:
Oil-Bbl
709
721
14. Attachments:
15. Well Class after proposed work:
ExploratoryD
16. Well Status after proposed work:
OilŒJ GasD
Copies of Logs and Surveys run-
Daily Report of Well Operations - !
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Garry Catron
Printed Name Garry Catron
JJ ¿(;;~EB (J 4 2005
Title
10212,10501
None
Burst
1490
8290
11200
7240
5210
6870
Collapse
470
7250
11780
5410
2480
4760
Tubing Pressure
700
322
DevelopmentŒ)
ServiceD
WAG D GINJD WINJD WDSPLD
Prepared by Garry Catron (907) 564-4657.
Sundry Number or NIA if C.O. Exempt:
N/A
Phone 564-4657
Production Technical Assistant
1/27/05
Signature
Date
Form 10-404 Revised 4/2004
RBDMS BFl FEB 0 4 2005
)
15-41 B
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
12/11/04 TIIIO ASSIST SEL. E-LlNE SET IBP. MIT TBG TO 2500 PSI. TBG. PASSED 2500 PSI MIT
LOST 50 PSI IN 30 MIN TIO=2000nOO/290
12/13/04 Perforate 10137'-101921 6 SPF
FLUIDS PUMPED
BBlS I
No Fluids Pumped
0 ITOTAl
IVED
FEB 0 3 2005
E
Alaska Oil &
Commission
Page 1
/" I- ~
83' 1-14-1/2" X 3-1/2" TBG XO, ID = 2.992" 1
GAS LIFT MANDRELS
39' 1 ST MD TVD DEV TYPE VLV LATCH PORT DATE
1 3577 3237 48 CA-FMHO DV RK 0 01/09/01
3964' ~ L ~ 2 6746 5322 53 CA-FMHO DV RK 0 01/09/01
3 9125 6965 31 CA-FMHO DV RK 0 01/09/01
4 10008 7787 8 CA-FMHO DV RK 0 01/09/01
TREE = 4-1/16" crw 5K
~~.t.~.~.ç>,.~^.. ^ ^... F~~
ACTUATOR = BAKER C
kS:äE\ï;" ........ . ..u66.3ï
......."",,,..,,,.m..m.."...'",.., ,,' '.. "....,,,,,,...
BF. ELEV = NA
.'ROp';;"".".""'^W"'.^^.'^"^^^^^145(f
",,"..., ,.... ....A,.,,,,,,,. "'''''N...",,' ..-.. "..,,,,,. .... .......",,«,
Max Angle = 94 @ 11580'
"Datum'MO.;' ..".,...,ww"ww...u,w"NiA'
""""""'"'''''''''''....~".,.....''''''' .........., "....." "...,."..., ""N'.
Datum TVD = 8800' SS
110-3/4" CSG, 45.5#, L-80, ID = 9.953" 1-1
19-5/8" CSG, 47#, L-80, ID = 8.681" 1-1
Minimum ID = 1.995" @ 10268'
TOP OF 2-3/8" LN R
13-1/2" TBG, 9.2#, FOX 13-CR-80, ID = 2.992" I.., 10148' 1
SAFETY NOTES: DURING RWO THE 3-1/2" UNIQUE
OVERSHOT WAS SPACED OUT TO SWALLOW 3-
1/2" TBGSTUB @ 10170'. DEPTH DISCREPANCY
DUE TO E-LlNE VS RIG MEASUREMENT.
TOPOF2-3/8"4.7#,STLLNR,ID=1.995"I.., 10268' 1
13-1/2" TBG, 9.2#, L-80, .0087 bpf, ID = 2.992" 1-1 10280' 1
1 7" CSG, 26#, L-80, ID = 6.276" I.., 10438' 1
PERFORA TION SUMMARY
REF LOG: SWS MCNL GRlCCL ON 10/08/01
ANGLE AT TOP PERF: 11 @ 10225'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
2-1/2" 6 10137 - 10192 0 12/13/04
2-1/4" 6 10225 - 10260 0 11/04/04
1-11/16" 4 12040 - 12363 0 10/09/01
1-11/16" 4 12401 - 12704 0 10/09/01
1-11/16" 4 12714 - 12720 0 10/09/01
I 5" LNR, 15#. 13-CR-80, ID = 4.408" 1-1 11150' 1
DATE
11/12/94
08/09/94
01/04/01
03/05/01
1 0/09/01
OS/24/01
10/15/01
REV BY
COMMENTS
ORIGINAL COM PLErION
RWO
RWO
ABORTED SIDErRACK
CTD SIDErRACK
CHITP CORRECTIONS
CHltlh CORRECTIONS
15-41 B
SAFE. '..)TES: WELL ANGLE> 70° @ 10970' & > 90°
@ 11169'. NOTE: NO SSSVN / LANDING NIP WERE
RUN @ THE NORMAL +/- 2000' DEPTH. NOTE: DRIFr
RESTRICTION THRU TOL, 1-11/16" LOGGING TOOLS
WOULDN'T PASS OS/23/03 - CHROME LNR& TBG
I i I 10080' 1"'3-1/2" HES X NIP, ID = 2.813".,1
Z :g I 10102' 1-17" X 4-1/2" BAKER S-3 PKR, ID = 3.875" 1
r J I 10127' 1"3-1/2" HES X NIP, ID = 2.813" 1
I 10170' 1-1 CHEM CUT TBG STUB - 12/23/00 1
I 10156' 1-13-1/2" UNIQUE OVERSHOT, ID = 3.625" 1
~ 10212' 1-12-1/2" BAKERIBPSET12/11/04 1
r)s 1 10207' 1-13-1/2" X 4-1/2" XO, ID = 2.992" 1
I 10210' 1--i7" X 4-1/2" BAKER SABL-3 PKR, ID = 3.875"1
1 10214' 1-14-1/2" X 3-1/2" XO, ID = 2.992" 1
D 1
~-¡ I 10245' 1-13-1/2" OTIS X NIP, 10 = 2.813" 1
I 10265' 1-12.70" BKR DEPLOYMENT SLV, ID = 2.250" 1
I 10267' 1-13-1/2" PARKER SWN NIP, ID = 2.750" 1
:8 :8 I 10270' 1-17" X 5" Trw LNRlHGRlPKR 1
I I 10281' 1"3-1/2" TTWLEG 1
~ .. I 10276' 1-1 ELMD TT LOGGED 09/12/01 1
lEI I 10515' 1-11.69" BAKER IBP SET 10/20/04 1
5" SIDETRACK WINDOW ( 15-41B)
10695' - 10705' (OFF CMT RAMP)
* NOTE: PRE -15-41 B SDTRK
WELLBORE NOT SHOWN ON THIS
DIA GRAM.
. \/F
RECEI , ",,<w
0 3 2005
.4
~
12-3/8" LNR, 4.7#, L-80, .0039 bpf, ID = 1.995" 1-1 12777' 1
DA TE REV BY COMMENTS
OS/23/03 SRBITP ADD SAFETY NOTE
06/13/03 CMOITLP KB ELEVATION CORRECTION
09/12/03 CMOITLP DATUM MDITVD CORRECTIONS
10/20/04 LDKlTLP SET IBP
11/04/04 MDClTLP ADD PERFS
12/11-13/04 JNAITLP IBP, ADD PERF
PRUDHOE BAY UNIT
WB..L: 15-41B
PERMIT No: 2011460
API No: 50-029-22492-02
SEC 22, T11 N, R14E, 1474' SNL & 4566' FB..
. BP Exploration (Alaska)
~) STATE OF ALASKA ) "-",,
ALASKA Oil AND GAS CONSERVATION COMMISSJ'~f*r '
REPORT OF SUNDRY WELL OPERAl\,',ONS
2. Operator BP Exploration (Alaska), Inc.
Name:
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
1. Operations Performed:
Abandon 0
Alter Casing D
Change Approved Program D
66.25
8. Property Designation:
ADL-0028306
11. Present Well Condition Summary:
Total Depth
Repair Well 0 PluQ Perforations[KJ
Pull Tubing 0 Perforate New Pool D
Operation Shutdown 0 Perforate [K]
Stimyt~\~¡~p OtherO
w¿ìt'èrD Time ExtensionO
Re-enter Suspended Well 0
5. Permit to Drill Number:
201-1460
6. API Number
50-029-22492-02-00
4. Current Well Class:
Development ]]
ExploratoryD
Service D
Stratigraphic D
9. Well Name and Number:
15-41 B
10. Field/Pool(s):
Prudhoe Bay Field / Prudhoe Oil Pool
measured 12777 feet
Effective Depth
true vertical 8799.9 feet
Size
20" 91.5# H-40
2-3/8" 4.7# L-80
5" 15# 13CR80
7" 26# L-80
10-3/4" 45.5# L-80
9-5/8" 47# L-80
Plugs (measured) 10501
Junk (measured) None
MD TVD Burst Collapse
36 116 36.0 - 116.0 1490 470
10265 - 12777 8106.1 - 8799.9 11200 11780
10270 - 10695 8111.0 - 8529.3 8290 7250
34 - 10438 34.0 - 8276.3 7240 5410
35 39 35.0 - 39.0 5210 2480
39 - 3964 39.0 - 3558.1 6870 4760
measured 10501 feet
true vertical 8338.5 feet
Casing
Conductor
Liner
Liner
Production
Surface
Surface
Length
80
2512
425
10404
4
3925
Perforation decth:
Measured depth: 10225 -10240,10240 -10260
True vertical depth: 8066.75 - 8081.48, 8081.48 - 8101.13
Tubing ( size, grade, and measured depth):
RBDMS BFL NOV 3 0 2004
4-1/2" 12.6# 13Cr80 @ 30
3-1/2" 9.2# 13Cr80 @ 113
4-1/2" 12.6# 13Cr80 @ 10118
3-1/2" 9.2# 13Cr80 @ 10126
4-1/2" Baker S-3 Hydro Set Packer
4-1/2" Baker SABL-3 Packer
5" TIW Liner Top Packer
113
10118
10126
10174
@ 10120
@ 10210
@ 10270
Packers & SSSV (type & measured depth):
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
Recresentative Daily Average Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
1~2 4
Well Shut-In
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Garry Catron
Printed Name Garry Catron
)1~ 6~.
Form 10-404 Revised 4/2004
13
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys run -
Daily Report of Well Operations - !
Signature
SCANNED DEC 0 2 2004
Oil-Bbl
700
Tubing Pressure
438
830
15. Well Class after proposed work:
ExploratoryD
16. Well Status after proposed work:
Oil Œ] GasD
DevelopmentŒ]
Service D
WAG D GINJD WINJD WDSPLD
Prepared by Garry Catron (907) 564-4657.
Sundry Number or N/A if C.O. Exempt:
NIA
Title
Production Technical Assistant
~h~", ,.e ,'Q64::4657
j ¡
. -... -~.
;' '\ ~\.,~-"""",
Date
11/29/04
-)
')
15-41 8
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
10/20/04 Set IBP @ 105151 MD Mid-element depth
11/03/04 PERFORATED 20' OF PUT RIVER FROM 102401-102601 WITH 2.25" HSD 6SPF PJ 2306
60DEG PHASED GUN. TAGGED LINER TOP AT 102741. JOB IN PROGRESS. WSR
CONTINUED ON 11-04-04.
11/04/04 PERFORATED 151 OF PUT RIVER FROM 102251-102401 WITH 2.25" HSD 6SPF 60 DEG
PHASED PJ 2306 CHARGES. JOB COMPLETE. PAD OPERATOR AND ASRC NOTIFIED
TO POP WELL.
FLUIDS PUMPED
BBLS
No Fluids Pumped
0
ITOTAL
Page 1
TREE = 4-1/16" CrN 5K
'O{ELL.HEM~ = FMC
ACTuATOR ;;""" šÄKËRc
'Kä:'ELÐT; " '" " """""66:3;'
"sF: 'ECBi";;' ""NÄ
'k.Op,;;",,,,,w,,,,,,,.mww,,mw,w""'W1'¡5õ;
. .m, . "'''~ .""......' ... , .......u..~u.~..« 0<.«.. ..........u........
Max Angle = 94 @ 11580'
bâtuñ1'Kìïb'; "w"''''''ÑÏA
'oatuffiTVÓ;'" ", '¿äöëYss
")
/'
110-3/4" CSG, 45.5#, L-80, ID = 9.953" I., 39' 1
19-5/8" CSG, 47#, L-80, ID = 8.681" I., 3964' ~
Minimum ID = 1.995" @ 10268'
TOP OF 2-3/8" LNR
13-1/2" TBG, 9.2#, FOX 13-CR-80, ID = 2.992" I., 10148' 1
SA FElY NOTES: DURING RWO THE 3-1/2" UNIQUE
OVERSHOT WAS SPACED OUT TO SWALLOW
3-1/2" TBG STUB @ 10170'. DEPTH DISCREPANCY DUE
TO E-LlNEVS RIG MEASUREMENT.
I TOP OF 2-3/8" 4.7#, STL LNR, ID = 1.995" I., 10268' 1
I 3-1/2" TBG, 9.2#, L-80, .0087 bpf, ID = 2.992" I., 10280' 1
17" CSG, 26#, L-80, ID = 6.276" I., 10438' 1
ÆRFORA TION SUMMARY
REF LOG: SWS MCNL GRlCCL ON 10/08/01
ANGLE AT TOP ÆRF: 11 @ 10225'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
2-1/4" 6 10225 - 10260 0 11/04/04
1-11/16" 4 12040 - 12363 0 10/09/01
1-11/16" 4 12401 - 12704 0 10/09/01
1-11/16" 4 12714 - 12720 0 10/09/01
I 5" LNR 15#, 13-CR-80, ID = 4.408" I., 11150' 1
DATE
11/12/94
08/09/94
01/04/01
03/05/01
10/09/01
OS/24/01
10/15/01
COMMENTS
ORIGINAL COM PLETION
RWO
RWO
ABORTED SIDETRACK
CTD SIDETRACK
CH/TP CORRECTIONS
CHltlh CORRECTIONS
DATE
OS/23/03
06/13/03
09/12/03
10/20/04
11/04/04
REV BY COMMENTS
SRBITP ADD SAFElY NOTE
CMOITLP KB ELEVATION CORRECTION
CMOITLP DATUM MDnvD CORRECTIONS
LDKlTLP SET IBP
MDCITLP ADD ÆRFS
REV BY
15-41 B
\
I- '
L
SAFE )OTES: WELL ANGLE> 70° @ 10970' & > 90°
@ 11169'. NOTE: NO SSSVN / LANDING NIP WERE
RUN @ THE NORMAL +/- 2000' DEPTH. NOTE: DRIFT
RESTRICTION THRU TOL, 1-11/16" LOGGING TOOLS
WOULDN'T PASS OS/23/03 - CHROME LNR & TBG
83'
~
ST MD TVD
1 3577 3237
2 6746 5322
3 9125 6965
4 10008 7787
I I I 10080'
Z ~ I 10102'
r ~ I 10127'
I 10170'
1 10156'
~ 10207'
8( )8 I 10210'
I 10214'
1
t~J
8 8
/
~
IE!I
~
~
..
I 10245'
I 10265'
1 10267'
I 10270'
I
I
1
1"3-1/2" OTIS X NIP, ID = 2.813" 1
1"2.70" BKR DEPLOYMENT SLV, ID = 2.250" 1
1--13-1/2" PARKER SWN NIP, ID = 2.750" 1
I., 7" X 5" TrN LNRlHGRlPKR 1
10281' I., 3-1/2" TT WLEG 1
10276' I., ELMD TT LOGGED 09/12/01 1
10515' I., 1.69" BAKER IBP SET 10/20/04 I
1"4-1/2" X 3-1/2" TBG XO, ID = 2.992" 1
GAS LIFT MANDRELS
DEV TYÆ VLV LATCH
48 CA-FMHO DV RK
53 CA-FMHO DV RK
31 CA-FMHO DV RK
8 CA-FMHO DV RK
PORT DATE
0 01/09/01
0 01/09/01
0 01/09/01
0 01/09/01
I., 3-1/2" HES X NIP, ID = 2.813" 1
I., 7" X 4-1/2" BAKER S-3 PKR, ID = 3.875" 1
1-i3-1/2" HESXNIP, ID=2.813" 1
1-1 CHEM CUT TBG STUB - 12/23/00 1
I., 3-1/2" UNIQUE OVERSHOT, ID = 3.625" 1
I., 3-1/2" X 4-1/2" XO, ID = 2.992" 1
I., 7" X 4-1/2" BAKER SABL-3 PKR, ID = 3.875" 1
1"4-1/2" X 3-1/2" XO, ID = 2.992" 1
5" SIDETRACK WINDOW ( 15-41B)
10695' - 10705' (OFF CMT RAMP)
* NOTE: PRE -15-41 B SDTRK
WELLBORE NOT SHOWN ON THIS
DIAGRAM.
12-3/8" LNR, 4.7#, L-80, .0039 bpf, ID = 1.995" l-i 12777' I
PRUDHOE BAY UNIT
WELL: 15-41 B
ÆRMITNo: 2011460
API No: 50-029-22492-02
SEC 22, T11N, R14E, 1474' SNL & 4566' FEL
BP Exploration (Alas.~~)
Permit to Drill
MD
12777 ---
-~ -----
q N () V ~ G- Q) ~
DATA SUBMITTAL COMPLIANCE REPORT
11/10/2003
2011460
Well Name/No. PRUDHOE BAY UNIT 15-41B
Operator BP EXPLORATION (ALASKA) INC
Sþ~¿ / ÒC} ~ I
API No. 50-029-22492-02-00
TVD
Completion Date 10/9/2001./'
Completion Status
1-01L
Current Status 1-01L
UIC N
8800 "'
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey ~ - f ~~ -
DATA INFORMATION
-- -,
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital
Type Med/Frmt
! ED C
¡
¡ED D
;
¡ED D
;
,
! Rpt
I
Electr
Dataset
Number
Log Log Run
Scale Media No
final
(data taken from Logs Portion of Master Well Data Maint)
"-h
Interval OH /
Start Stop CH Received
10157 12738 Case 11/27/2001
Comments
-------- -
1
1
~21
~O
cYì721
1
10611
10600
12278 Open
4/4/2002
10611
12777 Open 4/18/2002
12278 Open 4/4/2002
Well Cores/Samples Information:
Name
Interval
Start Stop
Received
Sent
ADDITIONAL INFORMATION
Well Cored? Y~
Chips Received? ~
Analysis
Received?
Daily History Received?
Formation Tops
~
_m__-_-- --
Sample
Set
Number Comments
G)N
ØN
_.
-- --
Comments: ~ tM~i-";" V'-ß~'I"'\.~.
~ o...w----- ~ IV\. D ~ 1-' V t:)
~ ~~ M.-ß ~ ,\v~ \!;) 'ß \
c.Qv-"lM.J~\"l rJ~i-~v- \"} ?5 () èJ; Å~ ~ \
-----,-
1~ ~
Compliance Reviewed By:
Date:
/ Ò ~~-~-~
(
"
~,.
II ~t~".*::~-í~
'----"::::'::"""':~:::___'_'..n__n-
¡:'~~;~l1.,!,;"...
-. - ~ .. ......
:.."'~:r ~'~' '"
Transmittal Form
" ""
II~~.. ;'"!!!'~"'h_.~_......'~n..."'~""~"
,-- .- -
." .. ...
BAKER
HUGHES
Baker Atlas
Canada GEOSciences Centre ¡
:-. .,;" ';:" ., -.
~_. ~.' .....
--...u ::-.~"- ¡ ~ :~;[
! ¡ ~n~,
" ; n ;~,
~ ¡ ~n¡
! : ¡po,
~ ¡ ~nr
-.." ¡ ¡ i~ ~~,
í ¡ !~ g¡
~ : itS;,
j ; iš Hi
j ¡ IH~:
,....~, i ¡ í! ill
II ¡ ~¡!!'
, : !q:!
~ ¡ ih~!
1 : ~t ~,:!
\ i ~i sit
~ ¡ iH¡¡
-~"-, ¡ : t.:£;
t ¡ It~, I
~ ¡ ih~l
i ¡ :H~i
i ¡ in,~I'
. . ~,..
~-.:' ~. .;:,~
~5$ "Ì .' :¡ i
,::""""1:;'::',':';,:¿:::",::"",::,¡
To: State of Alaska, Alaska Oil & Gas Conservation Commission
333 West ih Avenue, Suite 100
Anchorage, AK 99501
Attention: Lisa Weepie
Reference: BP Exploration, Inc. 18-32A Prudhoe Bay Unit~O)-IO1
BP Exploration, Inc. H-07A Prudhoe Bay Unit doU o-/à rg'
BP Exploration, Inc.15-41]3:pBIPl"\ldhq~J3ayUnit apl-¡4,l..R
B P Exploration, Inc. 4...41.A.:~B2P:rl.ldhoé' B ayU nìt~bO-L0¡5
BP Exploration, Inc.O5-14BPruâhoelBáyUnìtQOl-,< IKo
BP Exploration, Inc.,O5-28A PIlldhoe:ßayUnitaO1-19S
, ~ ,
Contains the following For Bachar The Above Wells:
1 - LAS Format disk
"';2"""F'l ",'
, , ~ ' , '
,:"".'lm,s,;~"..' "",,"','" ,',:,,',' ':,",'
",",i:r~L:"~~~~~'~~Pijn~ "
'" .':'" ,., ,:
;
i
i
;"'"
!_. -_-.J
. ." ,. .... ........-..
-,
:~.l"""""".:_'
-'--..::~: r::-:~~~._.
.." .. .
-- .- -----
. .' . ,..
--.---. --- ...-----_.--
== ::
... , .
-0-
. , . . . . .
.---.. ..-..-.-..-- ..-.-."
, .. -
; ""~;;,~.:~~~~~'~~:-~:~.-;:
~~~ ~~~.: ~~~f~:~~-~::::
~.;.- .---'------
~, (.~~---
~!~: .(~- ¡ '---~¿~-~
.~ :-:-'--~.;-:-:--:-:-'
....., """"'"
::t-::-:=-.: ':"::'":,-",,-'.....::::'
:r:~ ::'::::-:-:::-.:::\.~~:::
::::: R~~~;VED~;~
~-'.\ . _.: s~:;~:~.::: _::::~~::
--::.:.:.::"" -----":"':"":':::.....---..
ÞPR D 4 2002 ~t~-~~~;
PLEASE ACKNOWLEDGE RECEIPT BY SIGNIN~M~.~~-~: :....~~_:~:--.
OR::;!~~3~~~~7~~PY Ancltorage 1=]1. .." i
#:300~:O~~~t~~:. s.w.~"I.. ...__i3
Calgary, :z~e:c~' Canada I ,..~~~
Direct: (403) 537-3752 f~'"
FAX: (403) 537-3767
Sent By: Josef Berg
Received By: ¿~ ~ì
11 /21 /01
Scbllnberger
NO. 1638
Alaska Data & Consulting Services
3940 Arctic Blvd. Suite 300
Anchorage. AK 99503-5711
ATTN: Sherñe
Company:
state of Alaska
Alaska 011 & Gas Cons Comm
Aftn: LIsa Weeple
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay,Nlakuk
~.
Well
Job #
Log Description
Date
Blueline
Sepia
Color
Prints
CD
G-19A I~ :'1;;;-1 O~ MEM PROD PROFILE 11/07/01 1 1
N-4A I~ 5-{&:'-; PROD PROFILEIDEFT/GHOST 11/16/01 1 1
D-04A Ill. 7-1 ~ ~c:;' 21461 RST 10/22/01 1 1 1
D.S. 15-41 B é)..OJ-ll '" 21471 MCNL 10/08/01 1 1 1
D.S. 16-Q5A -:2 ()J- /J J () 21475 MCCL (PDC) 03/07/01 1
.-~,
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
Dote Delivered:
RECE\VED
NOV 2. 7 2001
~ s. c;omrntss to '
~
Schlumberger GeoQuest
3940 Arctic Blvd. Suite 300
Anchorage. AK 99503-5711
ATTN: Sherrie
Receivð~/A a-'fJ_- J
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2- 1
900 E. Benson Blvd.
Anchorage. Alaska 99508
1. Status of Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 201-146
3. Address 8. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22492-02
4. Location of well at surface - .";'-~:\i-) 9. Unit or Lease Name
1476' SNL, 710' EWL, SEC.22, T11 N, R14E, UM. ~ ..' 'ìœAl1ONì Prudhoe Bay Unit
At top of productive interval ' .LQ.:~q~-tl,-L :
3079' NSL, 362' EWL, SEC. 15, T11N, R14E, UM \ ..; :;~ \" ~ ~ ' 10. Well Number
At total depth if)..... ~. ~"', '
2577' NSL, 969' EWL, SEC. 15, T11 N, R14E, UM;:~-:-~,~.:"-,: .~«~. fit . ~.
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 66.25' ADL 028306
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
10/1/2001 10/6/2001 10/9/2001
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
12777 8800 FT 12742 8799 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, ROP, Memory CNL, CCL
23.
CASING
SIZE
20"
10-3/4" x 9-5/8"
WT. PER FT.
91.5#
47#
26#
15#
4.7#
7"
5"
2-3/8"
f STATE OF ALASKA (
ALASKA ùlL AND GAS CONSERVATION COMMI5SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Classification of Service Well
15-41 B
15. Water depth, if offshore 16. No. of Completions
N/ A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
None MD 1900' (Approx.)
GRADE
H-40
L-80
L-80
13Cr80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
Surface 110' 30" 60 sx Arctic Set (Aoorox.)
Surface 3964' 12-1/4" f44 sx PF 'E' 375 sx PF 'C'
Surface 10438' 8-1/2" 307 sx Class 'G'
10270' 10706' 6" 112 sx Class 'G'
10265' 12777' 3" 98 sx Class 'G'
AMOUNT PULLED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
1.56" Gun Diameter, 4 spf
MD TVD
12040' - 12363' 8793' - 8804'
1240 l' - 12704' 8803' - 8797'
12714' - 12720' 8797' - 8798'
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL-BBL
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE
28. CORE DATA ----;~.~ ."
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core1iCt:l.:!:.! V" '. ~
27.
Date First Production
October 18, 2001
Date of Test Hours Tested
Form 10-407 Rev. 07-01-80
25.
TUBING RECORD
SIZE DEPTH SET (MD)
3-1/2",9.2#, 13Cr80 10156'
3-1/2",9.3#, L-80 10281'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
2000' Freeze Protected with MeOH
MD
TVD
PACKER SET (MD)
10102'
10210'
GAs-McF
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
NOV 1 9 2001
Alaska Oil & Gas Cons. Commission
Anchorage
, ,
oa Iq YlOL-
NOV 2, 2001
Submit In Duplicate
G~
Ø3~
,(
"
:(
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
Zone 1 B
11773'
8760'
Zone 1A
11973'
8785'
RECEIVED
NOV 1 9 2001
Alaska Oil & Gas Coos. Commission
Anchorage
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble 4AAi1Htl ~ Title Technical Assistant
Date 1(-[9. Of
15-41 B
Well Number
201-146
Permit No. / Approval No.
Prepared By Name/Number:
Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
('
('
Well:
Field:
API:
Permit:
15-41 B
Prudhoe Bay Unit
50-029-22492-02
201-146
Rig Accept:
Rig Spud:
Rig Release:
Drilling.£!!.g:
09/21/01
10/01/01
10/09/01
Nordic #1
"--"n-'n__-'._---".--".'--",-,'.,-,'_..---n-.._.---.-.-............-.......-...-... -----.-... --------...-........-..-...".--..-----,,---.-_..._...n__... - ..' .... ..-""--'--"" ......- -........-....--.--..- ...---........---....-. .....---..-....-....-..--....--..- .... ...........--....-...--..-
PRE-RIG WORK
08123/01
MITOA to 2000 psi, failed.
09/10/01
MITIA to 3000 psi, passed. Perform step rate test on tubing.
09/12/01
Tag top of coil fish at 10707' slm.
09/16/01
Make up inflatable cement retainer with 2-5/8" bottom guide. Well head pressure is 2440 psi. Lead in
with 10 bbls 50/50 Methanol and pump 150 bbls 2% KCL to kill. Run in hole with 2.5" retainer.
09/17/01
Tag top of fish at 10748' ctm. Pick up to 10738', drop Y2" ball and set retainer. Pump 5 bbls of 17 ppg
Class 'G' cement below retainer, 5 bbls on top. Clean out to 10620' MD. Jet out at 80%, washing all
GLM's. Freeze protect from 2500' with Methanol and water.
t
"
(
BP EXPLORATION Page 1 -
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-418 Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
'.
Date. From": To Hours . Activity Code NPT Phase Descri ption of Op;erations
9/21/2001 15:30 - 17:30 2.00 RIGU P PRE ACCEPT NORDIC 1 ON DS 15-41B AT 15:30 HRS, 09/21/01.
BERM AND SPOT TANKS, N/U BOPE. GENERAL RIG UP.
17:30 - 23:00 5.50 BOPSUF P DECOMP PERFORM INITIAL BOPE PRESS / FUNCTION TEST. SEND
REPORT TO AOGCC.
23:00 - 00:00 1.00 SlWHIP P WEXIT CUT OFF BKR CTD. DRESS AND WELD ON DS CT
CONNECTOR
9/22/2001 00:00 - 00:30 0.50 SlWHIP P WEXIT WELD ON 2" CT CONNECTOR
00:30 - 01 :30 1.00 SlWHIP P WEXIT M/U BHI MWD MILLING BHA WITH 1.75 DEG MOTOR, 2.8"
PILOT MILL
01:30 - 02:15 0.75 SlWHIP N DFAL WEXIT ,RIH AND SHALLOW TEST TOOLS, SPERRY ORIENTER
FAILED.
02:15 - 02:45 0.50 SlWHIP N DFAL WEXIT POOH TO CHANGE OUT ORIENTER
02:45 - 03:15 0.50 SlWHIP N DFAL WEXIT CHANGE OUT ORIENTER
03:15 - 05:30 2.25 SlWHIP P WEXIT RIH, SHALLOW TEST OK, CONT. TO RIH.
05:30 - 06:30 1.00 SlWHIP P WEXIT MILL OUT 3 1/2" SWN NIPPLE TO 2.80". RIH.
06:30 - 07:30 1.00 SlWHIP P WEXIT LOG TIE-IN WTIH GR ADD 2.5 FT CTD.
07:30 - 08:00 0.50 SlWHIP P WEXIT ORIENT TF TO 270 DEG.
08:00 - 09:30 1.50 SlWHIP P WEXIT TAG CMT AT 10,617 FT BKB. MILL CMT AT 40 FPH, 1500
woe,
TO 10,685 FT AT 270 DEG.
09:30 - 09:40 0.17 SlWHIP P WEXIT ORIENT TF TO 90R AND MILL 4.5 FT CMT TO 10,689.4 FT
BKB.
FLAG CT AT 10,500 FT EOP.
09:40 -11:30 1.83 SlWHIP P WEXIT POOH FOR WINDOW MILL AND MOTOR.
11 :30 - 12:20 0.83 SlWHIP P WEXIT MIU 2.5 DEG FIXED BEND MOTOR AND 2.80" DIA WINDOW
MILL
12:20 - 14:20 2.00 SlWHIP P WEXIT RIH WITH MILLING BHA #2, 2.5 DEG MOTOR AND 2.8"
WINDOW MILL.
ADD 4 FT CTD AT FLAG.
14:20 - 15:10 0.83 SlWHIP P WEXIT ORIENT TF TO 80R.
15:10 - 16:30 1.33 SlWHIP P WEXIT TAG CMT AT 10687.4, CORRECT TO 10,689.4 FT. PICK UP
1 FT.
-START TIME MILLING AS PER PROCEDURE AT 10,688.4
FT.
TF = 80 DEG R. 1.9 BPM, 3300 PSI,
16:30 - 17:45 1.25 SlWHIP P WEXIT MILLING AT 10688.6 FT. TF = 90R, 1.8 BPM, 3200 PSI,
MILLED TO 10,688.8 FT.
17:45 - 18:30 0.75 SlWHIP P WEXIT MILLING, TF = 90 R, 1.8 BPM, 3200 PSI,
MILL TO 10689.1
18:30 - 20:00 1.50 SlWHIP P WEXIT MILLING, TF:84R, 1.8/3315 PSI, MILL TO 10689.4'
20:00 - 21 :00 1.00 SlWHIP P WEXIT MILLING, TF:81R, 1.8/3250 PSI, 200-300#WOB, MILL TO
10689.7'
21 :00 - 22:00 1.00 SlWHIP P WEXIT MILLING, TF:86R, 1.8/3300 PSI, 500-800# woe, MILL TO
10689.9'
22:00 - 23:00 1.00 SlWHIP P WEXIT MILLING, TF:86R, 1.8/3250 PSI, 1200-1500# woe, MILL TO
10690.2'
23:00 - 00:00 1.00 SlWHIP P WEXIT MILLING, TF:86R, 1.8/3250 PSI, 1200-1500#WOB, MILL TO
10690.7'
9/23/2001 . 00:00 - 01:00 1.00 SlWHIP P WEXIT MILLING, TF:84R, 1.8/3250 PSI, 1000-1500#WOB, MILL TO
10691.5'
01:00 - 02:15 1.25 SlWHIP P WEXIT MILLING, TF:93R, 1.8/3450 PSI, 1500-1700#WOB, MILL TO
10692.4'
END OF TIME SEQUENCE
Printed: 10/1512001 12:45:12 PM
('
(-
BP EXPLORATION Page 2 4I8t
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
,
. Date From-To Hours Activity Code NPT Phase. Description of Operations
.. ...
9/23/2001 02:15 - 02:45 0.50 STWHIP P WEXIT BEGIN INCREASING WOB TO 4K#. 300 DPSI TF:86R
MILL TO 10693.6'
02:45 - 03:15 0.50 STWHIP P WEXIT MILLING, TF:103R, 1.8/3350 PSI, 4000-5000# WOB, MILL
TO 10694.6'
03:15 - 03:45 0.50 STWHIP P WEXIT APPEAR TO HAVE POPPED THROUGH LINER AT 10695'.
TF BACK TO 85R.
03:45 - 06:00 2.25 STWHIP P WEXIT MILL AHEAD TO 10705'. EVIDENCE OF FORMATION ON
SHAKER.
06:00 - 07:30 1.50 STWHIP P WEXIT POOH. ORIGINAL EOP FLAG NOW AT 10502'. (FADED
WHITE). CONTINUE TO POOH.
07:30 - 08:00 0.50 STWHIP P WEXIT UO MOTOR AND MILL #2. MILL=2.79" OD. M/U 1.75 DEG
MOTOR AND 2.79" CRA YOLA MILL
08:00 - 10:00 2.00 STWHIP P WEXIT RIH WITH MILLING BHA #3. SHALLOW TEST TOOLS. RIH.
ON DEPTH AT FLAG AT 10502' EOP.
10:00 - 11 :00 1.00 STWHIP P WEXIT ORIENT TF TO 90R. TIED-IN WITH GR AT 10541 FT.
ADDED 9 FT TO CTD.
11:00 -13:00 2.00 STWHIP P WEXIT WEDGE CRAYOLA MILL AT 10,693 FT. CTD. TOP OF
WINDOW AT 10,690 FT. REAM DOWN. SEVERAL
STALLS. TF = 80R.
STALLING ON BOTTOM END OF WINDOW. SEVERAL
STALLS.
WEDGING LONG TAPER MILL AT BOTTOM OF WINDOW
ON STEEL
NO MOTOR WORK BEFORE STALLS.
13:00 - 14:00 1.00 STWHIP P WEXIT REAMING AT 10694 FT. SWAP WELL TO NEW FLOPRO.
FULL RETURNS.
SEVERAL QUICK STALLS. SLOW PROGRESS.
14:00 - 14:30 0.50 STWHIP P WEXIT LOOSING RETURNS. 50% RETURNS AFTER FLOPRO
REACHED SURFACE. HAD FULL RETURNS WITH BIOZAN.
EXTRA ECD OF FLOPRO APPARENTLY CAUSED FLUID
LOSS AT WINDOW.
NO PROGRESS.
14:30 - 16:15 1.75 STWHIP N DPRB WEXIT POOH FOR SMALLER OD CRA YOLA MILL
16:15 -17:00 0.75 STWHIP N DPRB WEXIT CHANGE BATTERIES IN BHI TOOLS. REPLACE 2.79" OD
CRAYOLA MILL WITH 2.70" OD CRAYOLA MILL
17:00 - 19:15 2.25 STWHIP N DPRB WEXIT RIH WITH MILLING BHA #4. 1.75 DEG MOTOR AND 2.70"
CRAYOLA MILL
SHALLOW HOLE TEST. RIH.
19:15 - 19:45 0.50 STWHIP N DPRB WEXIT LOG GR TIE IN FROM 10550'. ADD l' CORRECTION.
19:45 - 20:30 0.75 STWHIP N DPRB WEXIT ORIENT TO 90R.
20:30 - 21 :30 1.00 STWHIP N DPRB WEXIT REAM WINDOW IN DOWN PASS, TF:110R. SEVERAL
STALLS AT 10695'. PU & WORK THROUGH. BACK REAM
AT 1'/MIN. ABLE TO RUN THRU DRY.
21 :30 - 22:30 1.00 STWHIP N DPRB WEXIT ORIENT 1 CLICK. BACK REAM AT 1'/MIN.D
22:30 - 00:00 1.50 STWHIP N DPRB WEXIT PUMP 30 BBLS 10 PPB LCM (MIX-2). SQUEEZE AWAY AT
0.5 BPM, MAX PRESSURE 1050 PSI. SHUT-IN PRESSURE
DROPPED SLOWLY AFTER 30 BBLS SQUEEZED.
ESTABLISH CIRCULATION. 1.5IN/0.5 OUT
9/24/2001 00:00 - 01 :45 1.75 STWHIP N DPRB WEXIT MIX 15 BBLS 20 PPB MIX-2 LCM. DISPLACE WITH
FLOPRO. SHUT-IN WELL AND SQUEEZE. MAX
PRESSURE 850 PSI. BEGIN CIRCULATING. 1.5IN/0.6 OUT.
NOT MUCH CHANGE.
01 :45 - 03:30 1.75 STWHIP N DPRB WEXIT POOH FOR CEMENTNG ASSY.
Printed: 10/1512001 12:45:12 PM
{
1('
\
BP EXPLORATION Page 3-
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/24/2001 03:30 - 04:30 1.00 SlWHIP N DPRB WEXIT LD MWD & MTR. MU CEMENT STINGER.
04:30 - 07:00 2.50 SlWHIP N DPRB WEXIT RIH WITH CEMENTING ASSY. BHA OAL: 32.85'
TAG TD AT 10,701' CTD. CORRECT DEPTH TO 10,705 FT.
CIRC KCL WATER AND RECOVER FLOPRO.
1.8 BPM, 0.9 BPM RETURNS. 1520 PSI.
07:00 - 07:15 0.25 SlWHIP N DPRB WEXIT SAFETY MEETING WITH ALL PERSONNEL. REVIEW
CEMENTING PROCEDURE AND HAZARDS.
07:15 - 07:50 0.58 SlWHIP N DPRB WEXIT PRESS TEST CMT LINE. FINISH RECOVERING FLOPRO.
CMT AT WT AT 07:50 HRS.
07:50 - 09:00 1.17 SlWHIP N DPRB WEXIT STG 13.8 BBLS, 13.8 PPG, G CMT WI 8% BENTONITE DRY
BLENDED.
PURGE CEMENT LINE. DISPLACE SLURRY WITH RIG
PUMPS.
CLOSE CHOKE. SOZ 7 BBLS CMT TO FORMATION. FINAL
SQZ = 0.2 BPM AT 1670 PSI WHP. LAY IN 7 BBLS CMT.
WCTOC = 10,350 FT.
CMT IN PLACE AT 08:35 HRS. PULL TO SAFETY AT 10,050
FT.
09:00 - 09:40 0.67 SlWHIP N DPRB WEXIT HOLD SOZ PRESS ON CMT.
09:00, SIWHP = 1000 PSI, HOLD 15 MIN. LOST 150 PSI.
09:15, INC WHP TO 1100 PSI, LOST 90 PSI IN 7 MIN.
09:24, INC WHP TO 1350 PSI, LOST 250 PSI IN 16 MIN.
09:40 -10:10 0.50 SlWHIP N DPRB WEXIT RIH AND JET OUT CMT.
10400',2.0 BPM, 1400 PSI, 30 FPM, FULL RETURNS
10600',1.5 BPM, 1420 PSI, 20 FPM, FULL RETURNS
10704',1.5 BPM, 1450 PSI, 20 FPM, ATTD, FULL
RETURNS, NO WT LOSS THRU WINDOW.
10:10 -10:30 0.33 SlWHIP N DPRB WEXIT CIRC CONTAMINATED CMT TO SURFACE AT 1.5 BPM.
FULL RETURNS.
INC RATE TO 2.0 BPM, JET OUT WINDOW AREA AT 2
BPM,
NO WT LOSS GOING DOWN THRU WINDOW.
10:30 - 12:00 1.50 SlWHIP N DPRB WEXIT POOH WITH NOZZLE BHA. CMT SAMPLE IN DS LAB UCA
AT 11:30 HRS.
12:00 - 13:00 1.00 SlWHIP P WEXIT MIU BHI MWD BHA #6 WITH 2.12 DEG MOTOR AND DPI
2.69" X 3.0" BI-CENTER BIT. NEW BIT. BIT #5.
13:00 - 15:00 2.00 SlWHIP P WEXIT RIH WITH BHA #6 AT 90 FPM, NO PUMP.
RIH TO 10,500 FT,
15:00 - 20:00 5.00 SlWHIP N DPRB WEXIT WAIT ON CEMENT, NO COMPRESS STRENGTH IN UCA
SAMPLE AT 15:00HR
50 PSI COMPRESS STRENGTH AT 17:45 HRS. SAMPLE IN
UCAAT 11:30.
CEMENT IN PLACE AT 08:30 HRS.
20:00 - 20:30 0.50 SlWHIP P WEXIT LOG TIE-IN WITH GR. ADD 7 FT TO CTD.
20:30 - 21 :00 0.50 SlWHIP P WEXIT ORIENT TF TO 70R. STOP PUMP.
RIH AND EXIT WINDOW AT 10,695' WITH NO WT LOSS,
CLEAN WINDOW.
TAG TD AT 10,705 FT.
21:00 - 21:30 0.50 DRILL P PROD1 ORIENT TO 50-60R.
21 :30 - 23:30 2.00 DRILL P PROD1 DRILL AHEAD. DISPLACE WELL TO FLOPRO. 1.6 IN/1.4
OUT 3300 PSI FS. DRILL TO 10740'. FORMATION VERY
HARD.
23:30 - 00:00 0.50 DRILL P PROD1 DRILL TO 10745'.
Printed: 10/1512001 12:45:12 PM
(
('
BP EXPLORATION Page 4 ..
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
,Date From~To Hours: Activity Code NPT Phase" Description. of Operations
9/25/2001 00:00 - 02:00 2.00 DRilL P PROD1 DRILL AHEAD. 3300/1.6IN/1.3 OUT 10-15 ROP. TF:30-50R
ROP VERY SLOW. DRILL TO 10755'.
02:00 - 02:45 0.75 DRILL P PROD1 ORIENT TO 60R. REACTIVE TORQUE AS HIGH AS 270
DEG, MAKING TF DIFFICULT TO HOLD.
02:45 - 04:30 1.75 DRILL P PROD1 DRilL AHEAD TO 10775'
04:30 - 04:45 0.25 DRILL P PROD1 ORIENT TO MAINTAIN 50-60R TF
04:45 - 06:00 1.25 DRilL P PROD1 DRILL AHEAD. 3200 FS/1.5 IN/1.1 OUT TF:55R, ROP:30
FPH. SOME CHERT IN SAMPLES, FREQUENT STALLS
WHilE DRilLING. DRILL TO 10791'.
06:00 - 07:30 1.50 DRILL P PROD1 DRilLING, TF = 70R, 1.6/1.3 BPM, 3240 PSI, 24 FPH,
INCL = 41 DEG.
DRILLED TO 10, 820 FT.
07:30 - 10:00 2.50 DRILL P PROD1 DRILLING, TF = 80R, 1.6/1.1 BPM, 3100 PSI, 20 FPH,
INCl = 43 DEG.
DRILLED TO 10,845 FT.
10:00 - 13:00 3.00 DRILL P PROD1 DRILLING, TF = 80R, 1.6/0.8 BPM, 3100 PSI, 20 FPH,
INCL = 50 DEG.
DRillED TO 10,870 FT.
13:00 -15:15 2.25 DRILL P PROD1 POOH FOR BIT
15:15 - 15:45 0.50 DRILL P PROD1 UO MWD BHA. M/U NOZZLE AND STINGER TO LAY IN
FORM-A-PLUG Pill
BHA = 36.3 FT.
15:45 - 18:00 2.25 DRILL N DPRB PROD1 RIH WITH BHA #7, 2.40" NOZZLE ON STINGER.
CORRECTED DEPTH AT FLAG. ADDED 3 FT TO CTD.
18:00 - 19:00 1.00 DRILL N DPRB PROD1 RIG UP DS PUMP VAN AND HARD LINE.
19:00 - 19:30 0.50 DRILL N DPRB PROD1 Safety meeting with all hands on location (20) prior to pumping
Forma Plug pill. Discussed material safety, muster point,
pumping schedule, method of laying in pill, etc.
19:30 - 19:45 0.25 DRill N DPRB PROD1 PT pumpers hard lines, batch up gel pill.
19:45 - 19:55 0.17 DRill N DPRB PROD1 PUMP 10 BBlS OF FRESH WATER FLO PRO lEAD AHEAD
OF FORMA PLUG PilL. RIH AND TAG TD ON DEPTH AT
10,870 FT. WINDOW WAS CLEAN.
19:55 - 20:30 0.58 DRILL N DPRB PROD1 ON LINE PUMPING FORMAPlUG PILL, 11.0 PPG. GETTING
50% RETURNS.
PUMP TOTAL OF 19.3 BBlS FAP, WITH 1/4 PPB
CEllOFLAKE IN LAST 4 BBlS.
PUMP 7 BBlS FRESH WATER FLOPRO SPACER.
DISPLACE WITH FlOPRO.
1.3 BPM, 0.9 RETURNS, 3600 PSI AT 10 BBLS.
1.3 BPM, 1.0 RETURNS, 3400 PSI AT 22.7 BBLS DISPL.
FAP AT NOZZLE.
20:30 - 21 :00 0.50 DRill N DPRB PROD1 LAY IN FAP IN OPEN HOLE FROM TD OF 10870 FT AT 80%.
PUMP 1 BPM, PUll AT 80 FPM, 1.0 BPM, 0.7 BPM
RETURNS, 2800 PSI. LAY IN 2 BBlS IN OPEN HOLE.
PARK NOZZLE AT 10,685 FT. 10 FT ABOVE WINDOW.
CLOSE CHOKE.
SQZ 12 BBlS FAP TO FORMATION. 1.0 BPM AT 3300 PSI.
SLOW TO 0.5 BPM AT 2 BBlS SQZ. SIWHP = 1100 PSI, AT
4 BBl OUT,
SIWHP = 1400 PSI, AT 8 BBl OUT,
SIWHP = 1600 PSI, AT 12 BBl OUT.
SIWHP = 1800 PSI AT 12.5 OUT. OPEN CHOKE.
LAY IN FAP AT 1.0 BPM, PULL AT 50 FPM. TOP OF PLUG
Printed: 10/1512001 12:45:12 PM
~'
("
BP EXPLORATION Page 5 ..
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
..
9/25/2001 20:30 - 21 :00 0.50 DRILL N DPRB PROD1 AT 10,524 FT.
PULL TO SAFETY OF 10,000 FT.
21:00 - 21:30 0.50 DRILL N DPRB PROD1 10000', STOP COIL, PUMP AN ADDITIONAL 2 BBLS TO
ENSURE COIL FREE FROM FAP PILL. WAIT ON FAP TO
SET UP. 30 MIN.
21:30 - 21:45 0.25 DRILL N DPRB PROD1 RIH DRY TO 10575'. EXPECTED TOP OF GEL AT 10525'.
DID NOT SEE ANY LOSS IN WEIGHT. PUH BACK TO
SAFETY DEPTH. WILL WAIT AN ADDITIONAL 1/2 HOUR
PRIOR TO CHECKING GEL AGAIN.
21:45 - 22:15 0.50 DRILL N DPRB PROD1 10000', WAIT ON GEL.
22:15 - 22:30 0.25 DRILL N DPRB PROD1 RIH DRY TO 10625'. DID NOT SEE ANY SIGNIFICANT
WEIGHT LOSS. RIH WEIGHT WAS 9000#, AT 10619', SAW
500# LOSS FOR 2', THEN BACK TO NORMAL. AT MI
RECCOMENDATION, WILL WAIT AN ADDITIONAL 1/2
HOUR.
22:30 - 23:00 0.50 DRILL N DPRB PROD1 10000', WAIT ON GEL.
23:00 - 23:15 0.25 DRILL N DPRB PROD1 RIH DRY TO 10650'. DID NOT SEE ANY SIGNIFICANT
WEIGHT LOSS. AT MI RECCOMENDATION, WILL WAIT AN
ADDITIONAL 1 HOUR.
23:15 - 00:00 0.75 DRILL N DPRB PROD1 10000', WAIT ON GEL.
9/26/2001 00:00 - 00:15 0.25 DRILL N DPRB PROD1 1 0000', WAIT ON GEL.
00:15 - 00:30 0.25 DRILL N DPRB PROD1 RIH DRY. AT 10680', TAGGED FIRM GEL. WAS ABLE TO
RUN THROUGH IT WITH 2000# WEIGHT LOSS. PICKED UP
TO ABOVE EXPECTED TOP OF GEL.
00:30 - 00:50 0.33 DRILL N DPRB PROD1 PU TO 10500', KICK ON PUMPS AT 2 BPM, 3500 PSI CTP.
GETTING 1 FOR 1 RETURNS. RIH AT 15 FPM TO BREAK
UP ANY GEL LEFT IN WELLBORE. RAN DOWN TO 10705',
SAW 500# WEIGHT LOSS FROM 10680' TO 10705'.
PROBABLE FAP GEL.
00:50 - 02:30 1.67 DRILL N DPRB PROD1 POOH, HAD 1 FOR 1 RETURNS THE ENTIRE TIME. NO
LOSSES.
02:30 - 03:00 0.50 DRILL N DPRB PROD1 LAY DOWN NOZZLE BHA, PICK UP BHA #8. HUGHES
BICENTER BIT, 2.12 DEG MOTOR TO COMPLETE BUILD
SECTION.
03:00 - 04:00 1.00 DRILL N DPRB PROD1 JET ON EQUALIZING SUB WASHED OUT. SAME FOR
BACKUP. WAIT FOR SPARE FROM DEADHORSE.
04:00 - 04:25 0.42 DRILL P PROD1 RESUME RIG UP OF BHA #8.
04:25 - 06:30 2.08 DRILL P PROD1 RIH WITH BHA #8. SHALLOW HOLE TEST OF MWD
PASSED OK AT 1140'.
06:30 - 07:00 0.50 DRILL P PROD1 TIED-IN WITH GR, ADDED 11 FT TO CTD.
07:00 - 07:30 0.50 DRILL P PROD1 RAN THRU WINDOW WITH 150R TF. CLEANOUT
FORMAPLUG TO TD. TAG TD ON DEPTH AT 10870 FT.
FULL RETURNS 1.5/1.5 BPM.
07:30 - 08:00 0.50 DRILL P PROD1 ORIENT ON BOTTOM, 8 CLICKS TO GET TO 85R TF.
1.5/1.3 BPM RETURNS AFTER ORIENTING.
08:00 - 10:00 2.00 DRILL P PROD1 DRILLING, TF = 85R, 1.5 /1.3 BPM, 3200 PSI. 25 FPH, 55
DEG INCL.
DRILLED TO 10,950 FT. LOSSES SLOWLY INCREASING.
NOW AT 0.4 BPM.
10:00 - 10:30 0.50 DRILL P PROD1 ORIENT AROUND.
10:30 - 12:40 2.17 DRILL P PROD1 DRILLING, TF = 60R, 1.5/1.1 BPM, 3200 PSI, 40 FPH, 58
DEG INCL.
Printed: 10/1512001 12:45:12 PM
('
('
BP EXPLORATION Page 6 ~
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/26/2001 10:30 -12:40 2.17 DRILL P PROD1 DRILLED TO 11,020 ft.
12:40 - 13:30 0.83 DRILL P PROD1 WIPER TRIP TO WINDOW.
13:30 - 15:20 1.83 DRILL P PROD1 DRilLING, TF = 10R, 1.5/1.1 BPM, 3200 PSI, 80 FPH, 82
DEG INCL
DRillED TO 11,123 FT.
lOST All RETURNS. POSSIBLE FAULT.
15:20 -15:50 0.50 DRill P PROD1 WIPER TRIP TO WINDOW, PARTIAL RETURNSDURING
WIPER TRIP AND BACK ON BOTTOM, 1.5 BPM, 0.5 BPM
RETURNS.
15:50 - 16:00 0.17 DRilL P PROD1 DRILLING WITH PARTIAL RETURNS, 1.5/0.6 BPM.
LOST ALL RETURNS AGAIN AT 11,131 FT.
16:00 - 17:00 1.00 DRILL P PROD1 ORIENT TF TO 1 OOR.
17:00 - 19:15 2.25 DRILL P PROD1 DRILLING, TF = 100R, 1.6/0.8 BPM, 3000 PSI, 60 FPH,
INCl = 96 DEG. BETTER RETURNS AS WE DRILL AHEAD.
LANDED WELL AT 11,120 FT AT 8696 FT TVDSS, 6 FT
BELOW WELL PLAN
19:15 - 19:45 0.50 DRill P PROD1 11242', WIPER TRIP TO SHOE.
19:45 - 20:20 0.58 DRILL P PROD1 RESUME DRilLING, 1.7 BPM IN, 0.8 BPM OUT. lESS THAN
50% RETURNS. 3650 PSI CTP, TF 140R.
20:20 - 22:10 1.83 DRILL P PROD1 11278', TURN SECTION IS COMPLETED. POOH TO PICK
UP NOZZLE FOR CEMENTING lOSS ZONES.
22:10 - 23:00 0.83 DRILL P PROD1 LAY DOWN BHA #8, PICK UP CEMENTING NOZZLE.
23:00 - 00:00 1.00 DRill N DPRB PROD1 RIH WITH CEMENTING NOZZLE.
9/27/2001 00:00 - 01 :00 1.00 DRilL N DPRB PROD1 CONTINUE RIH WITH NOZZLE.
01:00 - 01:30 0.50 DRill N DPRB PROD1 10700', KICK ON PUMPS, BEGIN MUD SWAP, TAKING MUD
TO VAC TRUCK, DISPLACING WELL TO KCL PUMPING
1.7, GETTING BACK 1.0. RAN THROUGH LOSS ZONE AND
RETURNS DROPPED TO 0.6 BACK FOR 1.7 PUMPED.
PULL TO SHOE.
01:30 - 02:15 0.75 DRill N DPRB PROD1 STANDBY AT SHOE CIRCULATING KCL 1.71N, 0.6 OUT.
RIG UP CEMENTERS.
02:15 - 02:35 0.33 DRILL N DPRB PROD1 SAFETY MEETING PRIOR TO PUMPING CEMENT.
02:35 - 02:50 0.25 DRill N DPRB PROD1 PT HARDLINES TO 4000 PSI
02:50 - 04:00 1.17 DRill N DPRB PROD1 PUMP CEMENT JOB AS FOLLOWS; 2 BBLS FRESH H2O
SPACER, 15 BBlS NEAT 13.8 PPG BENTONITE CEMENT,
20 BBlS CEMENT WITH 10 PPB AGGREGATE, 4.4 BBLS
CEMENT WITH AGG AND 1/4 PPB CELAFLAKE,
PROBLEMS WITH BATCH MIXER, 1.4 BBLS NEAT CEMENT,
2 BBlS FRESH H2O. DISPLACE WITH RIG PUMPS. LAY IN
CEMENT TO WINDOW. SI CHOKE. SOEEZED 9.3 BBlS
INTO LOSS ZONES. SIWHP UP TO 1800 PSI.
LAY IN REMAINDER OF CEMENT. PUH TO SAFETY
DEPTH.
TOTAL OF 40.8 BBlS CEMENT PUMPED.
NOTE - CEMENT DENSITY ON RIG MICROMOTION WAS
14.5 PPG WHilE PUMPING NEAT CEMENT.
04:00 - 04:30 0.50 DRill N DPRB PROD1 7500', STOP AT SAFETY DEPTH. WAIT ON CEMENT.
04:30 - 05:50 1.33 DRill N DPRB PROD1 ClEANOUT CEMENT FROM TUBING GETTING 1 FOR 1
RETURNS. FOUND TOP OF CEMENT WHERE EXPECTED
AT 8000'. CLEANOUT TO 10680', AND HIT HARD CEMENT.
WASHED ON IT FOR 15 MINUTES, AND COULD NOT GET
PAST.
Printed: 10/1512001 12:45:12 PM
(:.
(
BP EXPLORATION Page7 ~
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
. Date From - To Hours Activity Code NPT Phase Description of Operations
9/27/2001 05:50 - 07:00 1.17 DRILL N DPRB PROD1 PUMP 40 BBL SPACER OF KCL, SWAP TO MUD. CIRC
WELL TO FLOPRO.
07:00 - 08:40 1.67 DRILL N DPRB PROD1 POOH.
08:40 - 09:15 0.58 DRILL N DPRB PROD1 M/U MWD BHA #10, 2.13 DEG MOTOR, HTC BI-CENTER
BIT #6 RR1.
09:15-11:30 2.25 DRILL N DPRB PROD1 RIH WITH BHA #10.
11 :30 - 11 :40 0.17 DRILL N DPRB PROD1 TIED-IN WITH GR. ADD 11 FT TO CTD. SWAP WELL TO
1 % KCL WATER WITH FRICTION REDUCER.
11 :40 - 13:00 1.33 DRILL N DPRB PROD1 TAG CMT TOP AT 10,693 FT. STALL SEVERAL TIMES
OVER FIRST FOOT. DRILL FIRM CMTTO 10,710 FT WITH
FULL RETURNS, 1.7/1.7 BPM.
13:00 - 16:00 3.00 DRILL N DPRB PROD1 DRILL FIRM CEMENT. 110 FPH, 1500 WOB, 1.8 11.8 BPM,
TF = 60R.
DRILL 110 FPH TO 10,731 FT. STALL SEVERAL TIMES AT
10,731 FT, NO PROGRESS. STALL MOTOR WITH NO
WOB. BHA STILL ACROSS WINDOW AT 10690 - 10695 FT.
PUMP 10 BBL FLOPRO PILL TO CLEAN HOLE. NO
DIFFERENCE. STALL EACH TIME AT 10,731 FT. NO
MOTOR WORK BEFORE STALL AND NO WOB. NO
PROGRESS IN 3 HOURS.
16:00 - 17:45 1.75 DRILL N DPRB PROD1 POOH TO INSPECT BHA.
17:45 -19:15 1.50 DRILL N DPRB PROD1 INSPECT BHA, BIT-3 CHIPPED TEETH FROM WINDOW,
MOTOR OK, BLEED PORT OK, NO MARKS ON BHA. NO
PROBLEMS APPARENT WITH BHA.
CIO BIT, MOTOR AND BAKER MHA.
19:15-21:25 2.17 DRILL N DPRB PROD1 RIH WITH BHA #11, 2.1 DEG MOTOR, BIT #7 - DPI
BI-CENTER, SN 1963816. SHALLOW HOLE TEST OF MWD
AND ORIENTER PASSED OK AT 2500'.
21:25 - 21:50 0.42 DRILL N DPRB PROD1 LOG TIE IN PASS DOWN. MAKE +9' CORRECTION.
21:50.22:10 0.33 DRILL N DPRB PROD1 ORIENT TO 60R, SAME TOOL FACE THAT THE ORIGINAL
HOLE WAS DRILLED AT.
22:10 - 22:30 0.33 DRILL N DPRB PROD1 TAG UP AT 10734'. ATTEMPT TO START DRILLING.
HITTING HARD STRINGER, SAME AS BEFORE. NOT
GETTING GOOD STALLS. MOTOR APPEARS TO BE
STALLING, BUT ISN'T GIVING A DISTINCTIVE QUICK
STALL. WILL POOH TO EXAMINE BIT AND MOTOR.
CHECK FOR LEAKS IN BHA, AND POSSIBLY RUN BACK IN
WITH A D331 DSM TO MILL HARD STREAK.
22:30 - 00:00 1.50 DRILL N DPRB PROD1 POOH.
9/28/2001 00:00 - 01 :30 1.50 DRILL N DPRB PROD1 TAG UP AT SURFACE. PT BHA #11, FOUND VERY SMALL
CRACK IN UBHO HOUSING. CHANGE OUT UBHO. CHECK
BIT AND MOTOR. FOUND BIT SEVERELY DAMAGED. 4
CUTTERS ON PILOT SECTION CHIPPED OR MISSING. 4
CUTTERS ON GAUGE SECTION BADLY CHIPPED. FACE
OF BIT RINGED. DAMAGE APPEARS TO HAVE COME
FROM JUNK OR POSSIBLY OTHER HARD DEBRIS ON
BOTTOM. GIVEN SHORT TIME THIS NEW BIT WAS ON
BOTTOM ON THE LAST RUN, THE DAMAGE APPEARS TO
BE QUITE BAD.
01 :30 - 02:25 0.92 DRILL N DPRB PROD1 WAIT ON NEW MOTOR FROM DEADHORSE.
Printed: 10/1512001 12:45:12 PM
(
("
BP EXPLORATION Page 8-
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From ... To Hours Activity Code ,NPT Phase Description of Operations
..
9/28/2001 02:25 - 03:00 0.58 DRILL N DPRB PROD1 MAKE UP NEW MOTOR AT 2.12 DEG, D331 DSM, AND
MWD PACKAGE. BHA #12.
03:00 - 05:00 2.00 DRILL N DPRB PROD1 RIH WITH BHA#12, 2.12 DEG MOTOR, 0331 DSM.
SHALLOW HOLE TEST OK.
05:00 - 05:10 0.17 DRILL N DPRB PROD1 TAG BOTTOM, MAKE =7' DEPTH CORRECTION. ORIENT
75R
05:10 - 06:00 0.83 DRILL N DPRB PROD1 BEGIN MILLING JUNK AT 10732.7'. 2000 PSI CTP, 1.5 IN,
1.5 OUT. VERY GRABBY AND LOTS OF STALLS AT FIRST.
AFTER 20 MINUTES, IT SMOOTHED OUT. MADE HOLE TO
10734.9 AT 40 FPH. HARD DRILLING AT 10734.9', ROP
DROPPED TO O. LOOKING AT INCLINATION WE ARE AT
11.34 DEG. SHOULD BE 15 DEG IF MWD TOOL IS 10' OUT
WINDOW. ALSO, TOP OF CEMENT RETAINER WAS SET
AT 10738'. IT IS PROBABLE THAT WE HAVE NOT EXITED
THE WINDOW, AND HAVE DRILLED UP THE CEMENT
RAMP TO THE TOP OF THE CEMENT RETAINER.
06:00 - 06:20 0.33 DRILL N DPRB PROD1 CIRCULATE 16 BBL FLO PRO SWEEP TO CLEAN DEBRIS
OOH.
06:20 - 08:30 2.17 DRILL N DPRB PROD1 POOH
08:30 - 09:00 0.50 DRILL N DPRB PROD1 UO MWD BHA.
09:00 - 10:00 1.00 DRILL N DPRB PROD1 GREASE INJECTOR CHAINS.
10:00 -15:30 5.50 DRILL P PROD1 PERFORM WEEKLY BOPE PRESS I FUNCTION TEST.
SEND REPORT TO AOGCC.
15:30 -16:15 0.75 DRILL N ~ DPRB PROD1 MIU BAKER 2 5/8" DB UNDERREAMER BHA DRESSED
WITH 4.22" BLADES.
16:15 -18:15 2.00 DRILL N DPRB PROD1 RIH WITH BHA #13
18:15 -18:45 0.50 DRILL N DPRB PROD1 STOP AT 10580 FT. ADD 10 FT CTD [AVE. DEPTH CORR].
CIRC. OPEN UR BLADES, RIH SLOW. TAG CMT AT
10620', DRILL CEMENT WITH UR.
18:45 - 21:00 2.25 DRILL N DPRB PROD1 10623', STALL. CONTINUE UR CEMENT. SEVERAL
STALLS AT 10625', REDUCE ROP BUT SLOW GETTING
STARTED. TOOK A WHILE, BUT WE ARE ABLE TO DRILL
AT ABOUT 24 FPH.
21 :00 - 22:00 1.00 DRILL N DPRB PROD1 10640', UPDATE AT 21:00, UR CEMENT SLOWWWWWL Y.
1.8 IN, 1.8 OUT. 2850 PSI CTP.
22:00 - 23:00 1.00 DRILL N DPRB PROD1 10654', PUMP 15 BBL SWEEP OF 2# BIOZAN.
23:00 - 00:00 1.00 DRILL N DPRB PROD1 10667' AT 23:00 - 10674' AT 24:00. CONTINUING TO UR
CEMENT.
9/29/2001 00:00 - 01 :00 1.00 DRILL N DPRB PROD1 CONTINUE UR CEMENT FROM 10675'.
01 :00 - 02:00 1.00 DRILL N DPRB PROD1 UPDATE AT 01:00, CONTINUING TO UR CEMENT AT
10683'.
02:00 - 03:00 1.00 DRILL N DPRB PROD1 UPDATE AT 02:00, CONTINUING TO UR CEMENT AT
10693'. IN MIDDLE OF WINDOW, NOT SEEING ANY
PROBLEMS. MADE IT THROUGH WINDOW OK. NO BAD
AREAS, AND ONLY A FEW STALLS.
03:00 - 04:00 1.00 DRILL N DPRB PROD1 UPDATE AT 03:00. CONTINUING TO UR CEMENT AT
10705'.
04:00 - 05:00 1.00 DRILL N DPRB PROD1 UPDATE AT 04:00. CONTINUING TO UR CEMENT AT
10719'. NO LOSSES. 100% RETURNS.
05:00 - 05:10 0.17 DRILL N DPRB PROD1 AT 10733', AS DEEP AS WE DARE GO WITHOUT HITTING
TOP OF BRIDGE PLUG. PUMP 2# BIO SWEEP.
05:10 - 06:30 1.33 DRILL N DPRB PROD1 SWEEP AROUND, START BACKREAM UP
06:30 - 08:30 2.00 DRILL N DPRB PROD1 REAM DOWN AT 5 FPM TO 10731 FT. BACK REAM UP TO
Printed: 10/1512001 12:45:12 PM
(
("
BP EXPLORATION Page 9 L I
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From ~ To, Hours Activity Code NPT Phase Description of Operations
9/29/2001 06:30 - 08:30 2.00 DRILL N DPRB PROD1 10,600 FT,
08:30 - 09:45 1.25 DRILL N DPRB PROD1 POOH.
09:45 - 10:15 0.50 DRILL N DPRB PROD1 UO MOTOR AND UNDERREAMER. MIU CMT NOZZLE.
10:15 - 12:15 2.00 DRILL N DPRB PROD1 RIH WITH CMT NOZZ BHA #14
12:15 - 12:30 0.25 DRILL P PROD1 SAFETY MEETING, REVIEW CMTG PROCEDURE AND
HAZARDS.
12:30 - 13:00 0.50 DRILL N DPRB PROD1 PRESS TEST CMT LINE.
13:00 - 14:15 1.25 DRILL N DPRB PROD1 CIRC BOTTOMS UP AT 3.3 BPM TO LIFT FILL SEEN AT
PBTD.
TAG PBTD AT 10733 FT.
14:15 -15:00 0.75 DRILL N DPRB PROD1 STAGE 8 BBLS, 17 PPG, G CEMENT SLURRY, [17.2 PPG AT
DESIOMETER].
DISPLACE WITH RIG PUMPS, 2.3 BPM, 2700 PSI, FULL
RETURNS.
NOZZAT 10,731 FT. CIRC 2 BBLS OUT NOZZAND LAY IN
6 BBLS AT 80%.
TOC = 10,300 FT. PULL TO 10,050 FT.
15:00 - 15:30 0.50 DRILL N DPRB PROD1 CIRC ABOVE CEMENT PLUG 15 MIN. RIH DRESS OFF TOP
OF CMT PLUG TO 10,630 FT AT 2.9 BPM, 3400 PSI.
15:30 - 17:30 2.00 DRILL N DPRB PROD1 POOH CHASING CEMENT TO SURFACE.
17:30 -18:30 1.00 DRILL N DPRB PROD1 UO BHA. CUT OFF 203 FT OF CT FOR FATIGUE MAINT.
WELD ON CTC. PULL TEST WI 30K.
18:30 -19:15 0.75 DRILL N DPRB PROD1 REPLACE PACKOFFS.
19:15 - 20:10 0.92 DRILL N DPRB PROD1 MAKE UP PILOT HOLE BHA. D331 DSM, 1.75 DEG WF
MOTOR. MWD.
20:10 - 20:30 0.33 DRILL N DPRB PROD1 RIH WITH BHA #15 TO DRILL PILOT HOLE.
20:30 - 21:15 0.75 DRILL N DPRB PROD1 SHALLOW HOLE TEST. ORIENTER IS NOT WORKING.
POOH TO CHANGE ORIENTER.
21:15 - 22:45 1.50 DRILL N DPRB PROD1 CHANGE OUT ORIENTER.
22:45 - 23:45 1.00 DRILL N DPRB PROD1 RIH. SHALLOW HOLE TEST AT 2500', MWD AND
ORIENTER PASSED OK.
23:45 - 00:00 0.25 DRILL N DPRB PROD1 LOG TIE IN PASS AT 10540'.
9/30/2001 00:00 - 01 :40 1.67 DRILL N DPRB PROD1 CONTINUE WITH TIE IN PASS. AT 10540'. MAKE +5'
CORRECTION, THEN RELOG TO CONFIRM TIE IN.
01:40 - 01:50 0.17 DRILL N DPRB PROD1 ORIENT TO 90L.
01 :50 - 04:25 2.58 DRILL N DPRB PROD1 TAG TOP OF CEMENT AT 10626', BEGIN DRILLING PILOT
HOLE AT 90L. PUMPING 1.6/1.6 2980 PSI. ROP=28 FPH.
04:25 - 05:00 0.58 DRILL N DPRB PROD1 DRILL AT 90L TOOL FACE TO 10700', PICK UP ORIENT
AROUND TO 90R. MILL RAMP 10700'-10704'. STARTED
GETTING TOOL FACE JUMPING AROUND A BIT. CALLED
THAT THE END OF THE RAMP. ACTUAL TOOL FACE WITH
REACTIVE WAS 76R FOR MOST OF WINDOW. NO
LOSSES AT ALL DURING THIS MILLING OPERATION.
(UPPER WINDOW CEMENT JOB IS HOLDING HYDRAULIC
ISOLATION)
05:00 - 07:00 2.00 DRILL N DPRB PROD1 PUMP 5 BBL BIO SWEEP AT BOTTOM, POOH
07:00 - 07:30 0.50 DRILL N DPRB PROD1 C/O MOTOR AND MILL. MIU MWD BHA #16 WITH 2.5 DEG
FIXED MOTOR AND 2.80" WINDOW MILL.
07:30 - 09:30 2.00 DRILL N DPRB PROD1 RIH WITH MWD BHA #16 TO MILL WINDOW. SHALLOW
TEST. RIH.
09:30 - 10:00 0.50 DRILL N DPRB PROD1 LOG TIE-IN WITH GR. ADDED 4 FT CTD.
10:00 - 10:20 0.33 DRILL N DPRB PROD1 ORIENT TF TO 90R.
10:20 -10:40 0.33 DRILL N DPRB PROD1 TAG LINER AT 10706.6 FT. FLAG CT. PICK UP 1 FT.
Printed: 10/1512001 12:45:12 PM
('
f
(
BP EXPLORATION -
Page 10
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/30/2001 10:20 - 10:40 0.33 DRILL N DPRB PROD1 START TIME MILLING AT 10:40 HRS AT 10,705.6 FT. TF =
90R. 1.8/1.8 BPM, 3330 PSI.
10:40 - 14:15 3.58 DRILL N DPRB PROD1 TIME MILLING AS PER SCHEDULE. 1.8/1.8 BPM, 3140
PSI, 118RTF.
MILLED TO 10,706.3 FT.
14:15 - 16:00 1.75 DRILL N DPRB PROD1 TIME MILLING WINDOW. 1.8/1.8 BPM, 3260 PSI, 118R
TF. 1000 woe.
MILLED TO 10,706.7 FT. ADDED 10 BBL BIOZAN AND
FRICTION REDUCER.
16:00 - 18:00 2.00 DRILL N DPRB PROD1 TIME MILLING, 1.8/1.8 BPM, 2600 PSI, 121 RTF. 2000
woe
MILLED TO 10,707.4 FT.
18:00 - 19:00 1.00 DRILL N DPRB PROD1 TIME MILLING, 1.8/1.8 BPM, 121R TF, 2000 woe MILLED
TO 10707.9 FT.
19:00 - 20:00 1.00 DRILL N DPRB PROD1 19:00 UPDATE. 10707.9', MILLING AHEAD. BEGINING TO
TAKE WEIGHT. LAST TENTH WE HAD woe OF 2200 LBS.
TF 120R
20:00 - 21 :00 1.00 DRILL N DPRB PROD1 20:00 UPDATE. 10708.5', MILLING AHEAD. LAST TENTH
WE HAD woe OF 2600 LBS. TF112R
21:00 - 21:40 0.67 DRILL N DPRB PROD1 21 :00 UPDATE. 10709.3, MILLING AHEAD. LAST TENTH
WE HAD woe OF 2900 LBS. TF 115 R. SEEING METAL
DURING ENTIRE OPERATION. GETTING SOME
FORMATION SAND NOW.
21 :40 - 22:00 0.33 DRILL N DPRB PROD1 BOTTOM OF WINDOW AT 10709.9'. DRILL AN ADDITIONAL
10' OF FORMATION TO 10720'. DRILLING AT 114R,
22:00 - 23:00 1.00 DRILL N DPRB PROD1 UPDATE AT 22:00 AT 10711.1', WOB=4300 LBS, TF=96R,
1.8/1.8,3350 PSI CTP. ABLE TO DRILL AHEAD AT 6-7 FPH.
23:00 - 23:45 0.75 DRILL N DPRB PROD1 MILLING FORMATION AT 10716.8' AT 22:00. ROP 7 FPH,
TF=98 R.
23:45 - 00:00 0.25 DRILL N DPRB PROD1 10721', LET MOTOR DRILL OFF, PUMP 5 BBL SWEEP OF
2# BIOZAN.
10/1/2001 00:00 - 00:15 0.25 DRILL N DPRB PROD1 CONTINUE TO PUMP BIOZAN SWEEP PRIOR TO POH.
00:15 - 01:45 1.50 DRILL N DPRB PROD1 POOH WITH WINDOW MILLING BHA.
01 :45 - 02:20 0.58 DRILL N DPRB PROD1 TAG UP, LAY DOWN WINDOW MILLING BHA. MILL
RECOVERED AT 2.79"GO, 2.78" NO GO. SWIRL PATTERN
ON NOSE OF MILL INDICATING IT CROSSED CENTER
LINE. MAKE UP NEXT MILL TO DRESS WINDOW. l'
CRAYOLA MILL WITH METAL MUNCHER BUTTONS 2.78"
OD. 1.75 DEG ADJUSTABLE BENT MOTOR.
02:20 - 04:20 2.00 DRILL N DPRB PROD1 RIH WITH BHA 17 TO DRESS WINDOW.
04:20 - 04:45 0.42 DRILL N DPRB PROD1 LOG TIE IN PASS DOWN FROM 10540'. MAKE +6'
CORRECTION.
04:45 - 05:25 0.67 DRILL N DPRB PROD1 RIH DRY, TAG UP AT TOP OF WINDOW 10704', ORIENT TO
90R, BRING ON PUMPS TO MINIMUM, RIH HUNG UP
AGAIN AT 10705'. PU, BRING UP RATE TO 1.7, RIH AS
FAST AS PRACTICAL. HUNG UP AT TOP OF WINDOW
10705'. CONTINUE TO WORK TOP OF WINDOW. TRIED
ABOUT 15 TIMES, CONTINUE TO STALL AT THE SAME
PLACE. POOH TO PICK UP LESS AGGRESSIVE CRA YOLA
MILL WITH NO METAL MUNCHER BUTTONS.
05:25 - 07:00 1.58 DRILL N DPRB PROD1 POOH FOR LESS AGGRESSIVE MILL.
07:00 - 07:15 0.25 DRILL N DPRB PROD1 CIO CRA YOLA MILL TO BAKER CTC CRA YOLA MILL WITH
Printed: 10/1512001 12:45:12 PM
(
('
BP EXPLORATION Page 11 -
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-418 Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/1/2001 07:00 - 07:15 0.25 DRILL N DPRB PROD1 NO METAL MUNCHER BUTTONS. 2.78" MILL.
07:15 - 07:30 0.25 DRILL P PROD1 SAFETY MEETING. REVIEW DRIVING HAZARDS WITH ICY
ROADS.
07:30 - 09:00 1.50 DRILL N DPRB PROD1 RIH WITH MILL TO DRESS WINDOW. SHALLOW TEST.
ORIENTER FAILED. POOH. ORIENTER HAD SMALL PIECE
OF CMT IN IT.
09:00 - 09:30 0.50 DRILL N DPRB PROD1 CIO SPERRY ORIENTER.
09:30 - 12:00 2.50 DRILL N DPRB PROD1 RIH WITH MILL TO DRESS WINDOW. SHALLOW TEST.
OK. RIH.
12:00 - 12:15 0.25 DRILL N DPRB PROD1 TIED-IN WITH GR. ADDED 4 FT CTD.
12:15 -12:20 0.08 DRILL N DPRB PROD1 ORIENT TF TO 90R.
12:20 - 12:40 0.33 DRILL N DPRB PROD1 DEPTH INDICATOR SLIPPED FOOTAGE WHILE RIH.
12:40 -13:10 0.50 DRILL N RREP PROD1 REPAIR INJECTOR HEAD CT DEPTH MEASURING WHEEL,
TIGHTEN CHAIN.
13:10 -13:30 0.33 DRILL N DPRB PROD1 RE-TIE-IN WITH GR, ADDED 4 FT TO CTD.
13:30 - 16:30 3.00 DRILL N DPRB PROD1 RIH AND STALL AT 10,707.7 AND 10707.9 FT. TF = 90R.
STALLED 4 TIMES BEFORE EXITING WINDOW. REAM IN
HOLE TO 10,716.4 FT AND STALL. BACK REAM 10 FPH.
FROM 10709 -10703'. RIH AND REAM FORMATION TO
10719 FT. BACK REAM 10709-10704 FT.
DRIFT WITH NO PUMP. WINDOW OK. REAM DOWN TO
10,719 FT. STACK WT. ORIENT 3 CLICKS AND
BACKREAM AT 130R TF.
SWAP TO FLOPRO WHILE BACKREAMING. FULL
RETURNS AT START.
FLAG CT AT 10,500 FT EOP. FLOPRO AT SURFACE STILL
HAVE FULL RETURNS, 1.6/1.6 BPM, 3100 PSI.
16:30 - 18:00 1.50 DRILL N DPRB PROD1 POOH WITH MILLING BHA.
18:00 - 18:15 0.25 DRILL P PROD1 SAFETY MEETING WITH DAY AND NIGHT CREWS.
REVIEW REPORTING PROCEDURE.
18:15 -19:30 1.25 DRILL N DPRB PROD1 UO MOTOR AND MILL. MILL GAUGED AT 2.73". M/U MWD
DRILLING BHA WITH 2.1 DEG MOTOR AND 2.69 - 3.0" DPI
BI-CENTER BIT. CHANGE OUT MWD BATTERIES AND
MHA.
19:30 - 21 :30 2.00 DRILL N DPRB PROD1 RIH WITH BHA #18, SHALLOW HOLE TEST OK. CONTINUE
RIH.
21 :30 - 22:25 0.92 DRILL N DPRB PROD1 CATCH EOP FLAG FROM LAST RUN, TAG BOTTOM
EXACTL Y SAME AS LAST RUN AT 10719'. ORIENT TO 90R.
22:25 - 23:00 0.58 DRILL N DPRB PROD1 BEGIN DRILLING BUILD AND TURN. 1.6/1.6, 3100 PSI FREE
SPIN, 100% RETURNS.
23:00 - 23:59 0.98 DRILL N DPRB PROD1 10731', DRILLING SLOW, ONLY ABOUT 30 FPH. GETTING
SOME LOSSES NOW. 1.6 IN, 1.4 BACK. TF 90R.
23:59 - 00:00 0.02 DRILL N DPRB PROD1 10754' AT MIDNIGHT. LOSSES HAVE HEALED, GETTING 1
FOR 1 RETURNS.
101212001 00:00 - 00:45 0.75 DRILL N DPRB PROD1 DRILL BUILD SECTION FR 10754'. 1.6IN/1.6 OUT, 3250
PSI, NO LOSSES,
00:45 - 01:10 0.42 DRILL N DPRB PROD1 GETTING LESS REACTIVE NOW. ORIENT AROUND TO
HOLD 90r AGAIN.
01:10 - 02:00 0.83 DRILL N DPRB PROD1 RESUME DRILLING FR 10763'. 1.6/1.5,3320 PSI. SLIGHT
LOSSES OF 0.1 BPM.
02:00 - 02:50 0.83 DRILL N DPRB PROD1 CAN'T HOLD 90R, CAN'T GET RELIABLE CLICKS. MESS
WITH ORIENTER FOR AND HOUR. THEN TRIP FOR NEW
ONE.
Printed: 10/1512001 12:45:12 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
9/21/2001
9/22/2001
9/23/2001
d'
(
(
BP EXPLORATION
Operations Summary Report
15-41
15-41 B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
15:30 -17:30
From - To Hours Activity Code NPT
17:30 - 23:00
23:00 - 00:00
00:00 - 00:30
00:30 - 01 :30
01:30 - 02:15
02:15 - 02:45
02:45 - 03:15
03:15 - 05:30
05:30 - 06:30
06:30 - 07:30
07:30 - 08:00
08:00 - 09:30
09:30 - 09:40
09:40 - 11 :30
11:30 -12:20
12:20 - 14:20
14:20 -15:10
15:10-16:30
16:30 - 17:45
17:45 -18:30
18:30 - 20:00
20:00 - 21 :00
21 :00 - 22:00
22:00 - 23:00
23:00 - 00:00
00:00 - 01 :00
01:00 - 02:15
2.00 RIGU
P
5.50 BOPSU¡:; P
1.00 STWHIP P
0.50 STWHIP P
1.00 STWHIP P
0.75 STWHIP N
0.50 STWHIP N
0.50 STWHIP N
2.25 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
0.50 STWHIP P
1.50 STWHIP P
0.17 STWHIP P
1.83 STWHIP P
0.83 STWHIP P
2.00 STWHIP P
0.83 STWHIP P
1.33 STWHIP P
1.25 STWHIP P
0.75 STWHIP P
1.50 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
1.25 STWHIP P
Phase
PRE
DECOMP
WEXIT
WEXIT
WEXIT
DFAL WEXIT
DFAL WEXIT
DFAL WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
Page 1 of 19
Start: 9/21/2001
Rig Release: 10/9/2001
Rig Number:
Spud Date: 7/22/1994
End: 10/9/2001
Description of Operations
ACCEPT NORDIC 1 ON DS 15-41 B AT 15:30 HRS, 09/21/01.
BERM AND SPOT TANKS, N/U BOPE. GENERAL RIG UP.
PERFORM INITIAL BOPE PRESS I FUNCTION TEST. SEND
REPORT TO AOGCC.
CUT OFF BKR CTD. DRESS AND WELD ON DS CT
CONNECTOR.
WELD ON 2" CT CONNECTOR.
M/U BHI MWD MILLING BHA WITH 1.75 DEG MOTOR, 2.8"
PILOT MILL
RIH AND SHALLOW TEST TOOLS, SPERRY ORIENTER
FAILED.
POOH TO CHANGE OUT ORIENTER.
CHANGE OUT ORIENTER.
RIH, SHALLOW TEST OK, CONT. TO RIH.
MILL OUT 3 1/2" SWN NIPPLE TO 2.80". RIH.
LOG TIE-IN WTIH GR. ADD 2.5 FT CTD.
ORIENT TF TO 270 DEG.
TAG CMT AT 10,617 FT BKB. MILL CMT AT 40 FPH, 1500
woe,
TO 10,685 FT AT 270 DEG.
ORIENT TF TO 90R AND MILL 4.5 FT CMT TO 10,689.4 FT
BKB.
FLAG CT AT 10,500 FT EOP.
POOH FOR WINDOW MILL AND MOTOR.
M/U 2.5 DEG FIXED BEND MOTOR AND 2.80" DIA WINDOW
MILL
RIH WITH MILLING BHA #2, 2.5 DEG MOTOR AND 2.8"
WINDOW MILL.
ADD 4 FT CTD AT FLAG.
ORIENT TF TO 80R.
TAG CMT AT 10687.4, CORRECT TO 10,689.4 FT. PICK UP
1 FT.
START TIME MILLING AS PER PROCEDURE AT 10,688.4
FT.
TF = 80 DEG R. 1.9 BPM, 3300 PSI,
MILLING AT 10688.6 FT. TF = 90R, 1.8 BPM, 3200 PSI,
MILLED TO 10,688.8 FT.
MILLING, TF = 90 R, 1.8 BPM, 3200 PSI,
MILL TO 10689.1
MILLING, TF:84R, 1.8/3315 PSI, MILL TO 10689.4'
MILLING, TF:81 R, 1.8/3250 PSI, 200-300# woe, MILL TO
10689.7'
MILLING, TF:86R, 1.8/3300 PSI, 500-800# woe, MILL TO
10689.9'
MILLING, TF:86R, 1.8/3250 PSI, 1200-1500#WOB, MILL TO
10690.2'
MILLING, TF:86R, 1.8/3250 PSI, 1200-1500# woe, MILL TO
10690.7'
MILLING, TF:84R, 1.8/3250 PSI, 1000-1500#WOB, MILL TO
10691.5'
MILLING, TF:93R, 1.8/3450 PSI, 1500-1700# woe, MILL TO
10692.4'
END OF TIME SEQUENCE
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 2 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 1 0/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/23/2001 02:15 - 02:45 0.50 STWHIP P WEXIT BEGIN INCREASING WOB TO 4K#. 300 DPSI TF:86R
MILL TO 10693.6'
02:45 - 03:15 0.50 STWHIP P WEXIT MILLING, TF:103R, 1.8/3350 PSI, 4000-5000# WOB, MILL
TO 10694.6'
03:15 - 03:45 0.50 STWHIP P WEXIT APPEAR TO HAVE POPPED THROUGH LINER AT 10695'.
TF BACK TO 85R.
03:45 - 06:00 2.25 STWHIP P WEXIT MILL AHEAD TO 10705'. EVIDENCE OF FORMATION ON
SHAKER.
06:00 - 07:30 1.50 STWHIP P WEXIT POOH. ORIGINAL EOP FLAG NOW AT 10502'. (FADED
WHITE). CONTINUE TO POOH.
07:30 - 08:00 0.50 STWHIP P WEXIT UO MOTOR AND MILL #2. MILL=2.79" OD. M/U 1.75 DEG
MOTOR AND 2.79" CRAYOLA MILL.
08:00 - 10:00 2.00 STWHIP P WEXIT RIH WITH MILLING BHA #3. SHALLOW TEST TOOLS. RIH.
ON DEPTH AT FLAG AT 10502' EOP.
10:00 - 11:00 1.00 STWHIP P WEXIT ORIENT TF TO 90R. TIED-IN WITH GR AT 10541 FT.
ADDED 9 FT TO CTD.
11 :00 - 13:00 2.00 STWHIP P WEXIT WEDGE CRAYOLA MILL AT 10,693 FT. CTD. TOP OF
WINDOW AT 10,690 FT. REAM DOWN. SEVERAL
STALLS. TF = 80R.
STALLING ON BOTTOM END OF WINDOW. SEVERAL
STALLS.
WEDGING LONG TAPER MILL AT BOTTOM OF WINDOW
ON STEEL.
NO MOTOR WORK BEFORE STALLS.
13:00 - 14:00 1.00 STWHIP P WEXIT REAMING AT 10694 FT. SWAP WELL TO NEW FLOPRO.
FULL RETURNS.
SEVERAL QUICK STALLS. SLOW PROGRESS.
14:00 - 14:30 0.50 STWHIP P WEXIT LOOSING RETURNS. 50% RETURNS AFTER FLOPRO
REACHED SURFACE. HAD FULL RETURNS WITH BIOZAN.
EXTRA ECD OF FLOPRO APPARENTLY CAUSED FLUID
LOSS AT WINDOW.
NO PROGRESS.
14:30 - 16:15 1.75 STWHIP N DPRB WEXIT POOH FOR SMALLER OD CRA YOLA MILL.
16:15 - 17:00 0.75 STWHIP N DPRB WEXIT CHANGE BATTERIES IN BHI TOOLS. REPLACE 2.79" OD
CRAYOLA MILL WITH 2.70" OD CRAYOLA MILL.
17:00 - 19:15 2.25 STWHIP N DPRB WEXIT RIH WITH MILLING BHA #4. 1.75 DEG MOTOR AND 2.70"
CRA YOLA MILL.
SHALLOW HOLE TEST. RIH.
19:15 - 19:45 0.50 STWHIP N DPRB WEXIT LOG GR TIE IN FROM 10550'. ADD l' CORRECTION.
19:45 - 20:30 0.75 STWHIP N DPRB WEXIT ORIENT TO 90R.
20:30 - 21 :30 1.00 STWHIP N DPRB WEXIT REAM WINDOW IN DOWN PASS, TF:110R. SEVERAL
STALLS AT 10695'. PU & WORK THROUGH. BACK REAM
AT 1'/MIN. ABLE TO RUN THRU DRY.
21 :30 - 22:30 1.00 STWHIP N DPRB WEXIT ORIENT 1 CLICK. BACK REAM AT 1'/MIN.D
22:30 - 00:00 1.50 STWHIP N DPRB WEXIT PUMP 30 BBLS 10 PPB LCM (MIX-2). SQUEEZE AWAY AT
0.5 BPM, MAX PRESSURE 1050 PSI. SHUT-IN PRESSURE
DROPPED SLOWLY AFTER 30 BBLS SQUEEZED.
ESTABLISH CIRCULATION. 1.5 IN/0.5 OUT
9/24/2001 00:00 - 01 :45 1.75 STWHIP N DPRB WEXIT MIX 15 BBLS 20 PPB MIX-2 LCM. DISPLACE WITH
FLOPRO. SHUT-IN WELL AND SQUEEZE. MAX
PRESSURE 850 PSI. BEGIN CIRCULATING. 1.5 IN/0.6 OUT.
NOT MUCH CHANGE.
01 :45 - 03:30 1.75 STWHIP N DPRB WEXIT POOH FOR CEMENTNG ASSY.
(
(
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 3 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 1 0/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/24/2001 03:30 - 04:30 1.00 STWHIP N DPRB WEXIT LD MWD & MTR. MU CEMENT STINGER.
04:30 - 07:00 2.50 STWHIP N DPRB WEXIT RIH WITH CEMENTING ASSY. BHA OAL: 32.85'
TAG TD AT 10,701' CTD. CORRECT DEPTH TO 10,705 FT.
CIRC KCL WATER AND RECOVER FLOPRO.
1.8 BPM, 0.9 BPM RETURNS. 1520 PSI.
07:00 - 07:15 0.25 STWHIP N DPRB WEXIT SAFETY MEETING WITH ALL PERSONNEL. REVIEW
CEMENTING PROCEDURE AND HAZARDS.
07:15 - 07:50 0.58 STWHIP N DPRB WEXIT PRESS TEST CMT LINE. FINISH RECOVERING FLOPRO.
CMT AT WT AT 07:50 HRS.
07:50 - 09:00 1.17 STWHIP N DPRB WEXIT STG 13.8 BBLS, 13.8 PPG, G CMT WI 8% BENTONITE DRY
BLENDED.
PURGE CEMENT LINE. DISPLACE SLURRY WITH RIG
PUMPS.
CLOSE CHOKE. SOZ 7 BBLS CMT TO FORMATION. FINAL
SQZ = 0.2 BPM AT 1670 PSI WHP. LAY IN 7 BBLS CMT.
WCTOC = 10,350 FT.
CMT IN PLACE AT 08:35 HRS. PULL TO SAFETY AT 10,050
FT.
09:00 - 09:40 0.67 STWHIP N DPRB WEXIT HOLD SOZ PRESS ON CMT.
09:00, SIWHP = 1000 PSI, HOLD 15 MIN. LOST 150 PSI.
09:15, INC WHP TO 1100 PSI, LOST 90 PSI IN 7 MIN.
09:24, INC WHP TO 1350 PSI, LOST 250 PSI IN 16 MIN.
09:40 -10:10 0.50 STWHIP N DPRB WEXIT RIH AND JET OUT CMT.
10400',2.0 BPM, 1400 PSI, 30 FPM, FULL RETURNS
10600',1.5 BPM, 1420 PSI, 20 FPM, FULL RETURNS
10704',1.5 BPM, 1450 PSI, 20 FPM, ATTD, FULL
RETURNS, NO WT LOSS THRU WINDOW.
10:10 -10:30 0.33 STWHIP N DPRB WEXIT CIRC CONTAMINATED CMT TO SURFACE AT 1.5 BPM.
FULL RETURNS.
INC RATE TO 2.0 BPM, JET OUT WINDOW AREA AT 2
BPM,
NO WT LOSS GOING DOWN THRU WINDOW.
10:30 - 12:00 1.50 STWHIP N DPRB WEXIT POOH WITH NOZZLE BHA. CMT SAMPLE IN DS LAB UCA
AT 11:30 HRS.
12:00 -13:00 1.00 STWHIP P WEXIT MIU BHI MWD BHA #6 WITH 2.12 DEG MOTOR AND DPI
2.69" X 3.0" BI-CENTER BIT. NEW BIT. BIT #5.
13:00 - 15:00 2.00 STWHIP P WEXIT RIH WITH BHA #6 AT 90 FPM, NO PUMP.
RIH TO 10,500 FT,
15:00 - 20:00 5.00 STWHIP N DPRB WEXIT WAIT ON CEMENT, NO COMPRESS STRENGTH IN UCA
SAMPLE AT 15:00HR
50 PSI COMPRESS STRENGTH AT 17:45 HRS. SAMPLE IN
UCAAT 11:30.
CEMENT IN PLACE AT 08:30 HRS.
20:00 - 20:30 0.50 STWHIP P WEXIT LOG TIE-IN WITH GR. ADD 7 FT TO CTD.
20:30 - 21 :00 0.50 STWHIP P WEXIT ORIENT TF TO 70R. STOP PUMP.
RIH AND EXIT WINDOW AT 10,695' WITH NO WT LOSS,
CLEAN WINDOW.
TAG TD AT 10,705 FT.
21:00 - 21:30 0.50 DRILL P PROD1 ORIENT TO 50-60R.
21 :30 - 23:30 2.00 DRILL P PROD1 DRILL AHEAD. DISPLACE WELL TO FLOPRO. 1.6 IN/1.4
OUT 3300 PSI FS. DRILL TO 10740'. FORMATION VERY
HARD.
23:30 - 00:00 0.50 DRILL P PROD1 DRILL TO 10745'.
('
(
Printed: 10/15/2001 12:45:12 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
)
(
(
BP EXPLORATION
Operations Summary Report
15-41
15-41 B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
9/25/2001
00:00 - 02:00
From - To Hours Activity Code NPT
PROD1
02:00 - 02:45
02:45 - 04:30
04:30 - 04:45
04:45 - 06:00
06:00 - 07:30
07:30 - 10:00
10:00 - 13:00
13:00 -15:15
15:15 -15:45
15:45 - 18:00
18:00 - 19:00
19:00 - 19:30
19:30 - 19:45
19:45 - 19:55
19:55 - 20:30
20:30 - 21 :00
2.00 DRILL
P
0.75 DRILL
P
1.75 DRILL
0.25 DRILL
1.25 DRILL
P
P
P
1.50 DRILL
P
2.50 DRILL
P
3.00 DRILL
P
2.25 DRILL
0.50 DRILL
P
P
2.25 DRILL
N
1.00 DRILL
0.50 DRILL
N
N
0.25 DRILL
0.17 DRILL
N
N
0.58 DRILL
N
0.50 DRILL
N
Phase
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
Page 4 of 19
Start: 9/21/2001
Rig Release: 10/9/2001
Rig Number:
Spud Date: 7/22/1994
End: 10/9/2001
Description of Operations
DRILL AHEAD. 3300/1.6 IN/1.3 OUT 10-15 ROP. TF:30-50R
ROP VERY SLOW. DRILL TO 10755'.
ORIENT TO 60R. REACTIVE TORQUE AS HIGH AS 270
DEG, MAKING TF DIFFICULT TO HOLD.
DRILL AHEAD TO 10775'
ORIENT TO MAINTAIN 50-60R TF
DRILL AHEAD. 3200 FS/1.5 IN/1.1 OUT TF:55R, ROP:30
FPH. SOME CHERT IN SAMPLES, FREQUENT STALLS
WHILE DRILLING. DRILL TO 10791'.
DRILLING, TF = 70R, 1.6/1.3 BPM, 3240 PSI, 24 FPH,
INCL = 41 DEG.
DRILLED TO 10, 820 FT.
DRILLING, TF = 80R, 1.6/1.1 BPM, 3100 PSI, 20 FPH,
INCL = 43 DEG.
DRILLED TO 10,845 FT.
DRILLING, TF = 80R, 1.6/0.8 BPM, 3100 PSI, 20 FPH,
INCL = 50 DEG.
DRILLED TO 10,870 FT.
POOH FOR BIT
UO MWD BHA. M/U NOZZLE AND STINGER TO LAY IN
FORM-A-PLUG PILL
BHA = 36.3 FT.
RIH WITH BHA #7, 2.40" NOZZLE ON STINGER.
CORRECTED DEPTH AT FLAG. ADDED 3 FT TO CTD.
RIG UP DS PUMP VAN AND HARD LINE.
Safety meeting with all hands on location (20) prior to pumping
Forma Plug pill. Discussed material safety, muster point,
pumping schedule, method of laying in pill, etc.
PT pumpers hard lines, batch up gel pill.
PUMP 10 BBLS OF FRESH WATER FLO PRO LEAD AHEAD
OF FORMA PLUG PILL. RIH AND TAG TD ON DEPTH AT
10,870 FT. WINDOW WAS CLEAN.
ON LINE PUMPING FORMAPLUG PILL, 11.0 PPG. GETTING
50% RETURNS.
PUMP TOTAL OF 19.3 BBLS FAP, WITH 1/4 PPB
CELLOFLAKE IN LAST 4 BBLS.
PUMP 7 BBLS FRESH WATER FLOPRO SPACER.
DISPLACE WITH FLOPRO.
1.3 BPM, 0.9 RETURNS, 3600 PSI AT 10 BBLS.
1.3 BPM, 1.0 RETURNS, 3400 PSI AT 22.7 BBLS DISPL.
FAP AT NOZZLE.
LAY IN FAP IN OPEN HOLE FROM TD OF 10870 FT AT 80%.
PUMP 1 BPM, PULL AT 80 FPM, 1.0 BPM, 0.7 BPM
RETURNS, 2800 PSI. LAY IN 2 BBLS IN OPEN HOLE.
PARK NOZZLE AT 10,685 FT. 10 FT ABOVE WINDOW.
CLOSE CHOKE.
SQZ 12 BBLS FAP TO FORMATION. 1.0 BPM AT 3300 PSI.
SLOW TO 0.5 BPM AT 2 BBLS SQZ. SIWHP = 1100 PSI, AT
4 BBL OUT,
SIWHP = 1400 PSI, AT 8 BBL OUT,
SIWHP = 1600 PSI, AT 12 BBL OUT.
SIWHP = 1800 PSI AT 12.5 OUT. OPEN CHOKE.
LAY IN FAP AT 1.0 BPM, PULL AT 50 FPM. TOP OF PLUG
Printed: 10/15/2001 12:45:12 PM
('
(
BP EXPLORATION Page 5 of 19
Operations Summary Report
Legal Well Name: 1 5-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/25/2001 20:30 - 21 :00 0.50 DRILL N DPRB PROD1 AT 10,524 FT.
PULL TO SAFETY OF 10,000 FT.
21:00-21:30 0.50 DRILL N DPRB PROD1 10000', STOP COIL, PUMP AN ADDITIONAL 2 BBLS TO
ENSURE COIL FREE FROM FAP PILL. WAIT ON FAP TO
SET UP. 30 MIN.
21:30 - 21:45 0.25 DRILL N DPRB PROD1 RIH DRY TO 10575'. EXPECTED TOP OF GEL AT 10525'.
DID NOT SEE ANY LOSS IN WEIGHT. PUH BACK TO
SAFETY DEPTH. WILL WAIT AN ADDITIONAL 1/2 HOUR
PRIOR TO CHECKING GEL AGAIN.
21:45 - 22:15 0.50 DRILL N DPRB PROD1 10000', WAIT ON GEL.
22:15 - 22:30 0.25 DRILL N DPRB PROD1 RIH DRY TO 10625'. DID NOT SEE ANY SIGNIFICANT
WEIGHT LOSS. RIH WEIGHT WAS 9000#, AT 10619', SAW
500# LOSS FOR 2', THEN BACK TO NORMAL. AT MI
RECCOMENDATION, WILL WAIT AN ADDITIONAL 1/2
HOUR.
22:30 - 23:00 0.50 DRILL N DPRB PROD1 10000', WAIT ON GEL.
23:00 - 23:15 0.25 DRILL N DPRB PROD1 RIH DRY TO 10650'. DID NOT SEE ANY SIGNIFICANT
WEIGHT LOSS. AT MI RECCOMENDATION, WILL WAIT AN
ADDITIONAL 1 HOUR.
23:15 - 00:00 0.75 DRILL N DPRB PROD1 10000', WAIT ON GEL.
9/26/2001 00:00 - 00:15 0.25 DRILL N DPRB PROD1 10000', WAIT ON GEL.
00:15 - 00:30 0.25 DRILL N DPRB PROD1 RIH DRY. AT 10680', TAGGED FIRM GEL. WAS ABLE TO
RUN THROUGH IT WITH 2000# WEIGHT LOSS. PICKED UP
TO ABOVE EXPECTED TOP OF GEL.
00:30 - 00:50 0.33 DRILL N DPRB PROD1 PU TO 10500', KICK ON PUMPS AT 2 BPM, 3500 PSI CTP.
GETTING 1 FOR 1 RETURNS. RIH AT 15 FPM TO BREAK
UP ANY GEL LEFT IN WELLBORE. RAN DOWN TO 10705',
SAW 500# WEIGHT LOSS FROM 10680' TO 10705',
PROBABLE FAP GEL.
00:50 - 02:30 1.67 DRILL N DPRB PROD1 POOH, HAD 1 FOR 1 RETURNS THE ENTIRE TIME. NO
LOSSES.
02:30 - 03:00 0.50 DRILL N DPRB PROD1 LAY DOWN NOZZLE BHA, PICK UP BHA #8. HUGHES
BICENTER BIT, 2.12 DEG MOTOR TO COMPLETE BUILD
SECTION.
03:00 - 04:00 1.00 DRILL N DPRB PROD1 JET ON EQUALIZING SUB WASHED OUT. SAME FOR
BACKUP. WAIT FOR SPARE FROM DEADHORSE.
04:00 - 04:25 0.42 DRILL P PROD1 RESUME RIG UP OF BHA #8.
04:25 - 06:30 2.08 DRILL P PROD1 RIH WITH BHA #8. SHALLOW HOLE TEST OF MWD
PASSED OK AT 1140'.
06:30 - 07:00 0.50 DRILL P PROD1 TIED-IN WITH GR, ADDED 11 FT TO CTD.
07:00 - 07:30 0.50 DRILL P PROD1 RAN THRU WINDOW WITH 150R TF. CLEANOUT
FORMAPLUG TO TD. TAG TD ON DEPTH AT 10870 FT.
FULL RETURNS 1.5 /1.5 BPM.
07:30 - 08:00 0.50 DRILL P PROD1 ORIENT ON BOTTOM, 8 CLICKS TO GET TO 85R TF.
1.5/1.3 BPM RETURNS AFTER ORIENTING.
08:00 - 10:00 2.00 DRILL P PROD1 DRILLING, TF = 85R, 1.5/1.3 BPM, 3200 PSI. 25 FPH, 55
DEG INCL.
DRILLED TO 10,950 FT. LOSSES SLOWLY INCREAS ING.
NOW AT 0.4 BPM.
10:00 -10:30 0.50 DRILL P PROD1 ORIENT AROUND.
10:30 -12:40 2.17 DRILL P PROD1 DRILLING, TF = 60R, 1.5/1.1 BPM, 3200 PSI, 40 FPH, 58
DEG INCL.
Printed: 10/15/2001 12:45:12 PM
(
(
BP EXPLORATION Page 6 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/26/2001 10:30 - 12:40 2.17 DRILL P PROD1 DRILLED TO 11,020 ft.
12:40 - 13:30 0.83 DRILL P PROD1 WIPER TRIP TO WINDOW.
13:30 - 15:20 1.83 DRILL P PROD1 DRILLING, TF = 10R, 1.5/1.1 BPM, 3200 PSI, 80 FPH, 82
DEG INCL.
DRILLED TO 11,123 FT.
LOST ALL RETURNS. POSSIBLE FAULT.
15:20 - 15:50 0.50 DRILL P PROD1 WIPER TRIP TO WINDOW, PARTIAL RETURNSDURING
WIPER TRIP AND BACK ON BOTTOM, 1.5 BPM, 0.5 BPM
RETURNS.
15:50 - 16:00 0.17 DRILL P PROD1 DRILLING WITH PARTIAL RETURNS, 1.5 I 0.6 BPM.
LOST ALL RETURNS AGAIN AT 11,131 FT.
16:00 - 17:00 1.00 DRILL P PROD1 ORIENT TF TO 1 OOR.
17:00 -19:15 2.25 DRILL P PROD1 DRILLING, TF = 100R, 1.6/0.8 BPM, 3000 PSI, 60 FPH,
INCL = 96 DEG. BETTER RETURNS AS WE DRILL AHEAD.
LANDED WELL AT 11,120 FT AT 8696 FT TVDSS, 6 FT
BELOW WELL PLAN
19:15 - 19:45 0.50 DRILL P PROD1 11242', WIPER TRIP TO SHOE.
19:45 - 20:20 0.58 DRILL P PROD1 RESUME DRILLING, 1.7 BPM IN, 0.8 BPM OUT. LESS THAN
50% RETURNS. 3650 PSI CTP, TF 140R.
20:20 - 22:10 1.83 DRILL P PROD1 11278', TURN SECTION IS COMPLETED. POOH TO PICK
UP NOZZLE FOR CEMENTING LOSS ZONES.
22:10 - 23:00 0.83 DRILL P PROD1 LAY DOWN BHA #8, PICK UP CEMENTING NOZZLE.
23:00 - 00:00 1.00 DRILL N DPRB PROD1 RIH WITH CEMENTING NOZZLE.
9/27/2001 00:00 - 01 :00 1.00 DRILL N DPRB PROD1 CONTINUE RIH WITH NOZZLE.
01:00 - 01:30 0.50 DRILL N DPRB PROD1 10700', KICK ON PUMPS, BEGIN MUD SWAP, TAKING MUD
TO VAC TRUCK, DISPLACING WELL TO KCL. PUMPING
1.7, GETTING BACK 1.0. RAN THROUGH LOSS ZONE AND
RETURNS DROPPED TO 0.6 BACK FOR 1.7 PUMPED.
PULL TO SHOE.
01:30-02:15 0.75 DRILL N DPRB PROD1 STANDBY AT SHOE CIRCULATING KCL. 1.7 IN, 0.6 OUT.
RIG UP CEMENTERS.
02:15 - 02:35 0.33 DRILL N DPRB PROD1 SAFETY MEETING PRIOR TO PUMPING CEMENT.
02:35 - 02:50 0.25 DRILL N DPRB PROD1 PT HARDLINES TO 4000 PSI
02:50 - 04:00 1.17 DRILL N DPRB PROD1 PUMP CEMENT JOB AS FOLLOWS; 2 BBLS FRESH H2O
SPACER, 15 BBLS NEAT 13.8 PPG BENTONITE CEMENT,
20 BBLS CEMENT WITH 10 PPB AGGREGATE, 4.4 BBLS
CEMENT WITH AGG AND 1/4 PPB CELAFLAKE,
PROBLEMS WITH BATCH MIXER, 1.4 BBLS NEAT CEMENT,
2 BBLS FRESH H2O. DISPLACE WITH RIG PUMPS. LAY IN
CEMENT TO WINDOW. SI CHOKE. SQEEZED 9.3 BBLS
INTO LOSS ZONES. SIWHP UP TO 1800 PSI.
LAY IN REMAINDER OF CEMENT. PUH TO SAFETY
DEPTH.
TOTAL OF 40.8 BBLS CEMENT PUMPED.
NOTE - CEMENT DENSITY ON RIG MICROMOTION WAS
14.5 PPG WHILE PUMPING NEAT CEMENT.
04:00 - 04:30 0.50 DRILL N DPRB PROD1 7500', STOP AT SAFETY DEPTH. WAIT ON CEMENT.
04:30 - 05:50 1.33 DRILL N DPRB PROD1 CLEANOUT CEMENT FROM TUBING GETTING 1 FOR 1
RETURNS. FOUND TOP OF CEMENT WHERE EXPECTED
AT 8000'. CLEANOUT TO 10680', AND HIT HARD CEMENT.
WASHED ON IT FOR 15 MINUTES, AND COULD NOT GET
PAST.
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 7 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/27/2001 05:50 - 07:00 1.17 DRILL N DPRB PROD1 PUMP 40 BBL SPACER OF KCL, SWAP TO MUD. CIRC
WELL TO FLOPRO.
07:00 - 08:40 1.67 DRILL N DPRB PROD1 POOH.
08:40 - 09:15 0.58 DRILL N DPRB PROD1 M/U MWD BHA #10, 2.13 DEG MOTOR, HTC BI-CENTER
BIT#6 RR1.
09:15 -11:30 2.25 DRILL N DPRB PROD1 RIH WITH BHA#10.
11 :30 - 11 :40 0.17 DRILL N DPRB PROD1 TIED-IN WITH GR. ADD 11 FT TO CTD. SWAP WELL TO
1 % KCL WATER WITH FRICTION REDUCER.
11 :40 - 13:00 1.33 DRILL N DPRB PROD1 TAG CMT TOP AT 10,693 FT. STALL SEVERAL TIMES
OVER FIRST FOOT. DRILL FIRM CMT TO 10,710 FT WITH
FULL RETURNS, 1.7/1.7 BPM.
13:00 - 16:00 3.00 DRILL N DPRB PROD1 DRILL FIRM CEMENT. 110 FPH, 1500 WOB, 1.8 /1.8 BPM,
TF = 60R.
DRILL 110 FPH TO 10,731 FT. STALL SEVERAL TIMES AT
10,731 FT, NO PROGRESS. STALL MOTOR WITH NO
WOB. BHA STILL ACROSS WINDOW AT 10690 -10695 FT.
PUMP 10 BBL FLOPRO PILL TO CLEAN HOLE. NO
DIFFERENCE. STALL EACH TIME AT 10,731 FT. NO
MOTOR WORK BEFORE STALL AND NO WOB. NO
PROGRESS IN 3 HOURS.
16:00 - 17:45 1.75 DRILL N DPRB PROD1 POOH TO INSPECT BHA.
17:45 -19:15 1.50 DRILL N DPRB PROD1 INSPECT BHA, BIT-3 CHIPPED TEETH FROM WINDOW,
MOTOR OK, BLEED PORT OK, NO MARKS ON BHA. NO
PROBLEMS APPARENT WITH BHA.
C/O BIT, MOTOR AND BAKER MHA.
19:15-21:25 2.17 DRILL N DPRB PROD1 RIH WITH BHA #11, 2.1 DEG MOTOR, BIT #7 - DPI
BI-CENTER, SN 1963816. SHALLOW HOLE TEST OF MWD
AND ORIENTER PASSED OK AT 2500'.
21:25 - 21:50 0.42 DRILL N DPRB PROD1 LOG TIE IN PASS DOWN. MAKE +9' CORRECTION.
21:50 - 22:10 0.33 DRILL N DPRB PROD1 ORIENT TO 60R, SAME TOOL FACE THAT THE ORIGINAL
HOLE WAS DRILLED AT.
22:10 - 22:30 0.33 DRILL N DPRB PROD1 TAG UP AT 10734'. ATTEMPT TO START DRILLING.
HITTING HARD STRINGER, SAME AS BEFORE. NOT
GETTING GOOD STALLS. MOTOR APPEARS TO BE
STALLING, BUT ISN'T GIVING A DISTINCTIVE QUICK
STALL. WILL POOH TO EXAMINE BIT AND MOTOR.
CHECK FOR LEAKS IN BHA, AND POSSIBLY RUN BACK IN
WITH A D331 DSM TO MILL HARD STREAK.
22:30 - 00:00 1.50 DRILL N DPRB PROD1 POOH.
9/28/2001 00:00 - 01 :30 1.50 DRILL N DPRB PROD1 TAG UP AT SURFACE. PT BHA #11, FOUND VERY SMALL
CRACK IN UBHO HOUSING. CHANGE OUT UBHO. CHECK
BIT AND MOTOR. FOUND BIT SEVERELY DAMAGED. 4
CUTTERS ON PILOT SECTION CHIPPED OR MISSING. 4
CUTTERS ON GAUGE SECTION BADLY CHIPPED. FACE
OF BIT RINGED. DAMAGE APPEARS TO HAVE COME
FROM JUNK OR POSSIBLY OTHER HARD DEBRIS ON
BOTTOM. GIVEN SHORT TIME THIS NEW BIT WAS ON
BOTTOM ON THE LAST RUN, THE DAMAGE APPEARS TO
BE QUITE BAD.
01 :30 - 02:25 0.92 DRILL N DPRB PROD1 WAIT ON NEW MOTOR FROM DEADHORSE.
(
(
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 8 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Sta rt: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/28/2001 02:25 - 03:00 0.58 DRILL N DPRB PROD1 MAKE UP NEW MOTOR AT 2.12 DEG, D331 DSM, AND
MWD PACKAGE. BHA #12.
03:00 - 05:00 2.00 DRILL N DPRB PROD1 RIH WITH BHA #12,2.12 DEG MOTOR, D331 DSM.
SHALLOW HOLE TEST OK.
05:00 - 05:10 0.17 DRILL N DPRB PROD1 TAG BOTTOM, MAKE =7' DEPTH CORRECTION. ORIENT
75R
05:10 - 06:00 0.83 DRILL N DPRB PROD1 BEGIN MILLING JUNK AT 10732.7'. 2000 PSI CTP, 1.5 IN,
1.5 OUT. VERY GRABBY AND LOTS OF STALLS AT FIRST.
AFTER 20 MINUTES, IT SMOOTHED OUT. MADE HOLE TO
10734.9 AT 40 FPH. HARD DRILLING AT 10734.9', Rap
DROPPED TO O. LOOKING AT INCLINATION WE ARE AT
11.34 DEG. SHOULD BE 15 DEG IF MWD TOOL IS 10' OUT
WINDOW. ALSO, TOP OF CEMENT RETAINER WAS SET
AT 10738'. IT IS PROBABLE THAT WE HAVE NOT EXITED
THE WINDOW, AND HAVE DRILLED UP THE CEMENT
RAMP TO THE TOP OF THE CEMENT RETAINER
06:00 - 06:20 0.33 DRILL N DPRB PROD1 CIRCULATE 16 BBL FLO PRO SWEEP TO CLEAN DEBRIS
OOH.
06:20 - 08:30 2.17 DRILL N DPRB PROD1 POOH
08:30 - 09:00 0.50 DRILL N DPRB PROD1 UO MWD BHA.
09:00 - 10:00 1.00 DRILL N DPRB PROD1 GREASE INJECTOR CHAINS.
10:00 -15:30 5.50 DRILL P PROD1 PERFORM WEEKLY BOPE PRESS / FUNCTION TEST.
SEND REPORT TO AOGCC.
15:30 -16:15 0.75 DRILL N DPRB PROD1 M/U BAKER 2 5/8" DB UNDERREAMER BHA DRESSED
WITH 4.22" BLADES.
16:15 - 18:15 2.00 DRILL N DPRB PROD1 RIH WITH BHA #13
18:15 -18:45 0.50 DRILL N DPRB PROD1 STOP AT 10580 FT. ADD 10 FT CTD [AVE. DEPTH CaRR].
CIRC. OPEN UR BLADES, RIH SLOW. TAG CMT AT
10620', DRILL CEMENT WITH UR
18:45 - 21:00 2.25 DRILL N DPRB PROD1 10623', STALL. CONTINUE UR CEMENT. SEVERAL
STALLS AT 10625', REDUCE ROP BUT SLOW GETTING
STARTED. TOOK A WHILE, BUT WE ARE ABLE TO DRILL
AT ABOUT 24 FPH.
21 :00 - 22:00 1.00 DRILL N DPRB PROD1 10640', UPDATE AT 21:00, UR CEMENT SLOWWWWWLY.
1.81N, 1.8 OUT. 2850 PSI CTP.
22:00 - 23:00 1.00 DRILL N DPRB PROD1 10654', PUMP 15 BBL SWEEP OF 2# BIOZAN.
23:00 - 00:00 1.00 DRILL N DPRB PROD1 10667' AT 23:00 - 10674' AT 24:00. CONTINUING TO UR
CEMENT.
9/29/2001 00:00 - 01 :00 1.00 DRILL N DPRB PROD1 CONTINUE UR CEMENT FROM 10675'.
01 :00 - 02:00 1.00 DRILL N DPRB PROD1 UPDATE AT 01:00, CONTINUING TO UR CEMENT AT
10683'.
02:00 - 03:00 1.00 DRILL N DPRB PROD1 UPDATE AT 02:00, CONTINUING TO UR CEMENT AT
10693'. IN MIDDLE OF WINDOW, NOT SEEING ANY
PROBLEMS. MADE IT THROUGH WINDOW OK. NO BAD
AREAS, AND ONLY A FEW STALLS.
03:00 - 04:00 1.00 DRILL N DPRB PROD1 UPDATE AT 03:00. CONTINUING TO UR CEMENT AT
10705'.
04:00 - 05:00 1.00 DRILL N DPRB PROD1 UPDATE AT 04:00. CONTINUING TO UR CEMENT AT
10719'. NO LOSSES. 100% RETURNS.
05:00 - 05:10 0.17 DRILL N DPRB PROD1 AT 10733', AS DEEP AS WE DARE GO WITHOUT HITTING
TOP OF BRIDGE PLUG. PUMP 2# BIO SWEEP.
05:10- 06:30 1.33 DRILL N DPRB PROD1 SWEEP AROUND, START BACKREAM UP
06:30 - 08:30 2.00 DRILL N DPRB PROD1 REAM DOWN AT 5 FPM TO 10731 FT. BACK REAM UP TO
('
(
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 9 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/29/2001 06:30 - 08:30 2.00 DRILL N DPRB PROD1 10,600 FT,
08:30 - 09:45 1.25 DRILL N DPRB PROD1 POOH.
09:45 - 10:15 0.50 DRILL N DPRB PROD1 UO MOTOR AND UNDERREAMER. M/U CMT NOZZLE.
10:15 - 12:15 2.00 DRILL N DPRB PROD1 RIH WITH CMT NOZZ BHA #14
12:15 - 12:30 0.25 DRILL P PROD1 SAFETY MEETING, REVIEW CMTG PROCEDURE AND
HAZARDS.
12:30 - 13:00 0.50 DRILL N DPRB PROD1 PRESS TEST CMT LINE.
13:00 - 14:15 1.25 DRILL N DPRB PROD1 CIRC BOTTOMS UP AT 3.3 BPM TO LIFT FILL SEEN AT
PBTD.
TAG PBTD AT 10733 FT.
14:15 -15:00 0.75 DRILL N DPRB PROD1 STAGE 8 BBLS, 17 PPG, G CEMENT SLURRY, [17.2 PPG AT
DESIOMETER].
DISPLACE WITH RIG PUMPS, 2.3 BPM, 2700 PSI, FULL
RETURNS.
NOZZAT 10,731 FT. CIRC 2 BBLS OUT NOZZAND LAY IN
6 BBLS AT 80%.
TOC = 10,300 FT. PULL TO 10,050 FT.
15:00 -15:30 0.50 DRILL N DPRB PROD1 CIRC ABOVE CEMENT PLUG 15 MIN. RIH DRESS OFF TOP
OF CMT PLUG TO 10,630 FT AT 2.9 BPM, 3400 PSI.
15:30 - 17:30 2.00 DRILL N DPRB PROD1 POOH CHASING CEMENT TO SURFACE.
17:30 - 18:30 1.00 DRILL N DPRB PROD1 UO BHA. CUT OFF 203 FT OF CT FOR FATIGUE MAINT.
WELD ON CTC. PULL TEST W/ 30K.
18:30 - 19:15 0.75 DRILL N DPRB PROD1 REPLACE PACKOFFS.
19:15 - 20:10 0.92 DRILL N DPRB PROD1 MAKE UP PILOT HOLE BHA. D331 DSM, 1.75 DEG WF
MOTOR. MWD.
20:10 - 20:30 0.33 DRILL N DPRB PROD1 RIH WITH BHA #15 TO DRILL PILOT HOLE.
20:30 - 21:15 0.75 DRILL N DPRB PROD1 SHALLOW HOLE TEST. ORIENTER IS NOT WORKING.
POOH TO CHANGE ORIENTER.
21:15 - 22:45 1.50 DRILL N DPRB PROD1 CHANGE OUT ORIENTER.
22:45 - 23:45 1.00 DRILL N DPRB PROD1 RIH. SHALLOW HOLE TEST AT 2500', MWD AND
ORIENTER PASSED OK.
23:45 - 00:00 0.25 DRILL N DPRB PROD1 LOG TIE IN PASS AT 10540'.
9/30/2001 00:00 - 01 :40 1.67 DRILL N DPRB PROD1 CONTINUE WITH TIE IN PASS. AT 10540'. MAKE +5'
CORRECTION, THEN RELOG TO CONFIRM TIE IN.
01 :40 - 01 :50 0.17 DRILL N DPRB PROD1 ORIENT TO 90L.
01 :50 - 04:25 2.58 DRILL N DPRB PROD1 TAG TOP OF CEMENT AT 10626', BEGIN DRILLING PILOT
HOLE AT 90L. PUMPING 1.6/1.62980 PSI. ROP=28 FPH.
04:25 - 05:00 0.58 DRILL N DPRB PROD1 DRILL AT 90L TOOL FACE TO 10700', PICK UP ORIENT
AROUND TO 90R. MILL RAMP 10700'-10704'. STARTED
GETTING TOOL FACE JUMPING AROUND A BIT. CALLED
THAT THE END OF THE RAMP. ACTUAL TOOL FACE WITH
REACTIVE WAS 76R FOR MOST OF WINDOW. NO
LOSSES AT ALL DURING THIS MILLING OPERATION.
(UPPER WINDOW CEMENT JOB IS HOLDING HYDRAULIC
ISOLATION)
05:00 - 07:00 2.00 DRILL N DPRB PROD1 PUMP 5 BBL BIO SWEEP AT BOTTOM, POOH
07:00 - 07:30 0.50 DRILL N DPRB PROD1 C/O MOTOR AND MILL. MIU MWD BHA #16 WITH 2.5 DEG
FIXED MOTOR AND 2.80" WINDOW MILL.
07:30 - 09:30 2.00 DRILL N DPRB PROD1 RIH WITH MWD BHA#16 TO MILL WINDOW. SHALLOW
TEST. RIH.
09:30 - 10:00 0.50 DRILL N DPRB PROD1 LOG TIE-IN WITH GR. ADDED 4 FT CTD.
10:00 - 10:20 0.33 DRILL N DPRB PROD1 ORIENT TF TO 90R.
10:20 - 10:40 0.33 DRILL N DPRB PROD1 TAG LINER AT 10706.6 FT. FLAG CT. PICK UP 1 FT.
(
(
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 10 of 19
Operations Summary Report
Legal Well Name: 1 5-41
Common Well Name: 1 5-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/30/2001 10:20 - 10:40 0.33 DRILL N DPRB PROD1 START TIME MILLING AT 10:40 HRS AT 10,705.6 FT. TF =
90R. 1.8 /1.8 BPM, 3330 PSI.
10:40 - 14:15 3.58 DRILL N DPRB PROD1 TIME MILLING AS PER SCHEDULE. 1.8/1.8 BPM, 3140
PSI, 118RTF.
MILLED TO 10,706.3 FT.
14:15 - 16:00 1.75 DRILL N DPRB PROD1 TIME MILLING WINDOW. 1.8/1.8 BPM, 3260 PSI, 118R
TF. 1000 WOB.
MILLED TO 10,706.7 FT. ADDED 10 BBL BIOZAN AND
FRICTION REDUCER.
16:00 - 18:00 2.00 DRILL N DPRB PROD1 TIME MILLING, 1.8/1.8 BPM, 2600 PSI, 121 RTF. 2000
WOB
MILLED TO 10,707.4 FT.
18:00 -19:00 1.00 DRILL N DPRB PROD1 TIME MILLING, 1.8/1.8 BPM, 121R TF, 2000 WOB MILLED
TO 10707.9 FT.
19:00 - 20:00 1.00 DRILL N DPRB PROD1 19:00 UPDATE. 10707.9', MILLING AHEAD. BEGINING TO
TAKE WEIGHT. LAST TENTH WE HAD WOB OF 2200 LBS.
TF 120R
20:00 - 21 :00 1.00 DRILL N DPRB PROD1 20:00 UPDATE. 10708.5', MILLING AHEAD. LAST TENTH
WE HAD WOB OF 2600 LBS. TF112R
21:00 - 21:40 0.67 DRILL N DPRB PROD1 21 :00 UPDATE. 10709.3, MILLING AHEAD. LAST TENTH
WE HAD WOB OF 2900 LBS. TF 115 R. SEEING METAL
DURING ENTIRE OPERATION. GETTING SOME
FORMATION SAND NOW.
21 :40 - 22:00 0.33 DRILL N DPRB PROD1 BOTTOM OF WINDOW AT 10709.9'. DRILL AN ADDITIONAL
10' OF FORMATION TO 10720'. DRILLING AT 114R,
22:00 - 23:00 1.00 DRILL N DPRB PROD1 UPDATE AT 22:00 AT 10711.1', WOB=4300 LBS, TF=96R,
1.8/1.8, 3350 PSI CTP. ABLE TO DRILL AHEAD AT 6-7 FPH.
23:00 - 23:45 0.75 DRILL N DPRB PROD1 MILLING FORMATION AT 10716.8' AT 22:00. ROP 7 FPH,
TF=98 R.
23:45 - 00:00 0.25 DRILL N DPRB PROD1 10721', LET MOTOR DRILL OFF, PUMP 5 BBL SWEEP OF
2# BIOZAN.
10/1/2001 00:00 - 00:15 0.25 DRILL N DPRB PROD1 CONTINUE TO PUMP BIOZAN SWEEP PRIOR TO POH.
00:15 - 01:45 1.50 DRILL N DPRB PROD1 POOH WITH WINDOW MILLING BHA.
01 :45 - 02:20 0.58 DRILL N DPRB PROD1 TAG UP, LAY DOWN WINDOW MILLING BHA. MILL
RECOVERED AT 2.79"GO, 2.78" NO GO. SWIRL PATTERN
ON NOSE OF MILL INDICATING IT CROSSED CENTER
LINE. MAKE UP NEXT MILL TO DRESS WINDOW. l'
CRAYOLA MILL WITH METAL MUNCHER BUTTONS 2.78"
OD. 1.75 DEG ADJUSTABLE BENT MOTOR.
02:20 - 04:20 2.00 DRILL N DPRB PROD1 RIH WITH BHA 17 TO DRESS WINDOW.
04:20 - 04:45 0.42 DRILL N DPRB PROD1 LOG TIE IN PASS DOWN FROM 10540'. MAKE +6'
CORRECTION.
04:45 - 05:25 0.67 DRILL N DPRB PROD1 RIH DRY, TAG UP AT TOP OF WINDOW 10704', ORIENT TO
90R, BRING ON PUMPS TO MINIMUM, RIH HUNG UP
AGAIN AT 10705'. PU, BRING UP RATE TO 1.7, RIH AS
FAST AS PRACTICAL. HUNG UP AT TOP OF WINDOW
10705'. CONTINUE TO WORK TOP OF WINDOW. TRIED
ABOUT 15 TIMES, CONTINUE TO STALL AT THE SAME
PLACE. POOH TO PICK UP LESS AGGRESSIVE CRA YOLA
MILL WITH NO METAL MUNCHER BUTTONS.
05:25 - 07:00 1.58 DRILL N DPRB PROD1 POOH FOR LESS AGGRESSIVE MILL.
07:00 - 07:15 0.25 DRILL N DPRB PROD1 CIO CRA YOLA MILL TO BAKER CTC CRA YOLA MILL WITH
(
('
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 11 of 19
Operations Summary Report
Legal Well Name: 1 5-41
Common Well Name: 1 5-41 8 Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/1/2001 07:00 - 07:15 0.25 DRILL N DPRB PROD1 NO METAL MUNCHER BUTTONS. 2.78" MILL.
07:15 - 07:30 0.25 DRILL P PROD1 SAFETY MEETING. REVIEW DRIVING HAZARDS WITH ICY
ROADS.
07:30 - 09:00 1.50 DRILL N DPRB PROD1 RIH WITH MILL TO DRESS WINDOW. SHALLOW TEST.
ORIENTER FAILED. POOH. ORIENTER HAD SMALL PIECE
OF CMT IN IT.
09:00 - 09:30 0.50 DRILL N DPRB PROD1 C/O SPERRY ORIENTER.
09:30 - 12:00 2.50 DRILL N DPRB PROD1 RIH WITH MILL TO DRESS WINDOW. SHALLOW TEST.
OK. RIH.
12:00 - 12:15 0.25 DRILL N DPRB PROD1 TIED-IN WITH GR. ADDED 4 FT CTD.
12:15 -12:20 0.08 DRILL N DPRB PROD1 ORIENT TF TO 90R.
12:20 - 12:40 0.33 DRILL N DPRB PROD1 DEPTH INDICATOR SLIPPED FOOTAGE WHILE RIH.
12:40 -13:10 0.50 DRILL N RREP PROD1 REPAIR INJECTOR HEAD CT DEPTH MEASURING WHEEL,
TIGHTEN CHAIN.
13:10 - 13:30 0.33 DRILL N DPRB PROD1 RE-TIE-IN WITH GR, ADDED 4 FT TO CTD.
13:30 - 16:30 3.00 DRILL N DPRB PROD1 RIH AND STALL AT 10,707.7 AND 10707.9 FT. TF = 90R.
STALLED 4 TIMES BEFORE EXITING WINDOW. REAM IN
HOLE TO 10,716.4 FT AND STALL. BACK REAM 10 FPH.
FROM 10709 -10703', RIH AND REAM FORMATION TO
10719 FT. BACK REAM 10709-10704 FT.
DRIFT WITH NO PUMP. WINDOW OK. REAM DOWN TO
10,719 FT. STACK WT. ORIENT 3 CLICKS AND
BACKREAM AT 130R TF.
SWAP TO FLOPRO WHILE BACKREAMING. FULL
RETURNS AT START.
FLAG CT AT 10,500 FT EOP. FLOPRO AT SURFACE STILL
HAVE FULL RETURNS, 1.6/1.6 BPM, 3100 PSI.
16:30 -18:00 1.50 DRILL N DPRB PROD1 POOH WITH MILLING BHA.
18:00 -18:15 0.25 DRILL P PROD1 SAFETY MEETING WITH DAY AND NIGHT CREWS.
REVIEW REPORTING PROCEDURE.
18:15-19:30 1.25 DRILL N DPRB PROD1 LlO MOTOR AND MILL. MILL GAUGED AT 2.73". M/U MWD
DRILLING BHA WITH 2.1 DEG MOTOR AND 2.69 - 3.0" DPI
BI-CENTER BIT. CHANGE OUT MWD BATTERIES AND
MHA.
19:30 - 21:30 2.00 DRILL N DPRB PROD1 RIH WITH BHA #18, SHALLOW HOLE TEST OK. CONTINUE
RIH.
21 :30 - 22:25 0.92 DRILL N DPRB PROD1 CATCH EOP FLAG FROM LAST RUN, TAG BOTTOM
EXACTLY SAME AS LAST RUN AT 10719'. ORIENT TO 90R.
22:25 - 23:00 0.58 DRILL N DPRB PROD1 BEGIN DRILLING BUILD AND TURN. 1.6/1.6, 3100 PSI FREE
SPIN, 100% RETURNS.
23:00 - 23:59 0.98 DRILL N DPRB PROD1 10731', DRILLING SLOW, ONLY ABOUT 30 FPH. GETTING
SOME LOSSES NOW. 1.6 IN, 1.4 BACK. TF 90R.
23:59 - 00:00 0.02 DRILL N DPRB PROD1 10754' AT MIDNIGHT. LOSSES HAVE HEALED, GETTING 1
FOR 1 RETURNS.
10/2/2001 00:00 - 00:45 0.75 DRILL N DPRB PROD1 DRILL BUILD SECTION FR 10754'. 1.6 IN/1.6 OUT, 3250
PSI, NO LOSSES,
00:45 - 01:10 0.42 DRILL N DPRB PROD1 GETTING LESS REACTIVE NOW, ORIENT AROUND TO
HOLD 90r AGAIN.
01:10 - 02:00 0.83 DRILL N DPRB PROD1 RESUME DRILLING FR 10763'. 1.6/1.5,3320 PSI. SLIGHT
LOSSES OF 0.1 BPM.
02:00 - 02:50 0.83 DRILL N DPRB PROD1 CAN'T HOLD 90R, CAN'T GET RELIABLE CLICKS. MESS
WITH ORIENTER FOR AND HOUR, THEN TRIP FOR NEW
ONE.
{
('
Printed: 10/15/2001 12:45:12 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
10/2/2001
10/3/2001
{'
(
BP EXPLORATION
Operations Summary Report
1 5-41
15-41 B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date
From - To Hours Activity Code NPT
Phase
02:50 - 04:15
04:15 - 04:45
04:45 - 06:30
06:30 - 07:30
07:30 - 09:30
09:30 - 11 :30
11 :30 - 12:30
12:30 -14:30
14:30 -15:30
15:30 -16:00
16:00 - 16:30
16:30 - 17:45
17:45 - 18:30
18:30 -18:45
18:45 - 19:15
19:15 - 19:30
19:30 - 20:30
20:30 - 20:35
20:35 - 21 :45
21 :45 - 22:45
22:45 - 00:00
00:00 - 02:00
02:00 - 04:45
1.42 DRILL
0.50 DRILL
1.75 DRILL
1.00 DRILL
2.00 DRILL
2.00 DRILL
1.00 DRILL
2.00 DRILL
1.00 DRILL
0.50 DRILL
0.50 DRILL
1.25 DRILL
0.75 DRILL
0.25 DRILL
0.50 DRILL
0.25 DRILL
1.00 DRILL
0.08 DRILL
1.17 DRILL
1.00 DRILL
1.25 DRILL
2.00 DRILL
2.75 DRILL
N
N
DPRB PROD1
DPRB PROD1
N
DPRB PROD1
N
N
DPRB PROD1
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
N
N
N
N
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
N
DPRB PROD1
Page 12 of 19
Start: 9/21/2001
Rig Release: 10/9/2001
Rig Number:
Spud Date: 7/22/1994
End: 10/9/2001
Description of Operations
10770', POOH FOR ORIENTER.
TAG UP AT SURFACE, CHANGE OUT ORIENTER.
INSPECT BIT.
BIT IN GREAT SHAPE, RIH WITH BHA #19. SHALLOW
HOLE TEST OF MWD AND ORIENTER PASSED AT 2500'.
RIH. CORRECT DEPTH AT FLAG,
ADD 5 FT.
ORIENT TF TO 90R
DRILLING, TF = 80 R. 1.6/1.3 BPM. 3200 PSI, 10 FPH,
HAD FULL RETURNS ON BOTTOM UNTIL ORIENTING. 0.3
BPM MUD LOSS AFTER ORIENTING. DRILLED TO 10800
FT.
DRILLING, TF = 82R, 1.6/1.1 BPM, 3200 PSI, 20 FPH,
MUD LOSS OF 0.5 BPM. DRILLED TO 10,835 FT. AHEAD
ON INCL AND AZ. DIRECTIONAL IN GOOD SHAPE.
ORIENT TO 45R AT WINDOW. LOSSES INCREASED
WHILE ORIENTING.
DRILLING BUILD SEC, TF = 30R, 1.6/1.0 BPM, 3200 PSI,
40 FPH,
DRILLED TO 10862 FT.
DRILLING, TF = 38R, 1.6/.6 BPM, 3200 PSI, 25 FPH. MUD
LOSSES INCREASED AT SAME DEPTH AS LAST HOLE
[10860 FT ON LAST HOLE].
DRILLED TO 10880 FT.
DRILLING, TF = 38R, 1.6/.9 BPM,3200 PSI, 50 FPH.
DRILLED TO 10905 FT.
ORIENT TO HIGH SIDE. TURN COMPLETED. NEED BUILD
TO LAND.
DRILLING, TF = 5R, 1.5/0.8 BPM, 2900 PSI, 40 FPH, 54
DEG INCL.
DRILLED TO 10,940 FT.
DRILLING, TF = 7R, 1.6/0.7 BPM, 2900 PSI, 50 FPH, 69
DEG INCL. MEANWHILE START SWAPPING HOLE TO 2%
KCL WATER WITH FRICTION REDUCER. DRILLED TO
10,986 FT.
MOTOR STALLING. P/U AND RBIH. HOLE COMPLETELY
SWAPPED TO KCL WATER.
DRILLING, TF = 8R, 1.6/1.2 BPM, 2350PSI, 40 FPH, 72
DEG INCL.
DRILLED TO SECTION TD AT 11,000 FT.
POOH BHA #19 TO 10,541 FT.
LOG GR TIE-IN. ADD 10 FT TO CTD.
PUH TO 10,500 FT AND FLAG CT EOP.
POOH BHA #19 TO SURFACE.
UD BHA. CHECK BIT - 50% WORN. OBSERVE WELL
STATIC LOSSES @ 0.15BPM. CIO MHA & DOWNSIZE MWD
FLOW RESTRICTOR. RESET AKO TO 1.1 DEG BEND.
GBR WELDER INSTALL TUGGER LINE GUIDES ON
INJECTOR. MEANWHILE OBSERVE WELL STATIC LOSSES
@ 0.2BPM.
CONTINUE INSTALLING TUGGER LINE GUIDES ON
INJECTOR.
P/U & RIH BHA #20 TO 2,500 FT. SHALLOW HOLE TEST
Printed: 10/15/200112:45:12 PM
- -
BP EXPLORATION Page 13 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 8 Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/3/2001 02:00 - 04:45 2.75 DRILL N DPRB PROD1 OK. CONTINUE RIH TO EOP FLAG. ADD 10 FT TO CTD.
CONTINUE RIH TO BOTTOM TAGGED @ 11,007 FT.
04:45 - 05:00 0.25 DRILL N DPRB PROD1 P/U, ORIENT 12 CLICKS TO 31 DEG TOOL FACE.
05:00 - 05:45 0.75 DRILL N DPRB PROD1 DRILLING, TF = 29R, 1.6/1.5 BPM, 2900 PSI, 60 FPH,
83.5 DEG INCL. DRILLED TO 11,056 FT.
05:45 - 05:50 0.08 DRILL N DPRB PROD1 P/U & ORIENT.
05:50 - 06:15 0.42 DRILL N DPRB PROD1 DRILLING, TF = 40R, 1.6/1.3 BPM, 2900 PSI, 70 FPH, 84
DEG INCL. DRILLED TO 11,062 FT. MOTOR STALLING.
06:15 - 07:25 1.17 DRILL N DPRB PROD1 DRILLING, TF = 90R, 1.6/1.4 BPM, 2800 PSI, 44FPH, 85
DEG INCL. DRILLED TO 11144'
07:25 - 08:00 0.58 DRILL N DPRB PROD1 Wiper to window, hole is clean
08:00 - 09:05 1.08 DRILL N DPRB PROD1 Drilling 80-150'/hr 1.7/1.4 2600 95R. Pumping 20 bbl Flo Pro
sweep every 80 bbls and fluid system is about 50/50 mud/KCI.
Drill to 11210'
09:05 - 09:25 0.33 DRILL N DPRB PROD1 Wiper to window prior to POOH. Getting 16 deg/100 DLS with
a 1.1 deg motor last 200' (will require too many zig/zags to get
to TD)
09:25 - 10:45 1.33 DRILL N DPRB PROD1 POOH for motor
10:45 - 11 :20 0.58 DRILL N DPRB PROD1 Change motor for a 0.8 deg
11 :20 - 13:30 2.17 DRILL N DPRB PROD1 RIH wI BHA #21
13:30 - 14:00 0.50 DRILL N DPRB PROD1 Precautionary ream to TD, clean
14:00 - 14:10 0.17 DRILL N DPRB PROD1 Tag at 11200' CTD, corr to 11210'. Drilling 100'/hr 1.7/1.4 2600
120R to 11220'
14:10 - 14:30 0.33 DRILL N DPRB PROD1 Orient around from 120R
14:30 - 15:00 0.50 DRILL N DPRB PROD1 Drilling 100'/hr 1.6/1.5 2600 1 OOR to 11260'
15:00 - 15:15 0.25 DRILL N DPRB PROD1 Orient to left
15:15 - 17:00 1.75 DRILL P PROD1 Drilling 70-90'/hr 1.5/1.4 2500 122L
17:00 - 17:35 0.58 DRILL P PROD1 Drilling 60-80'/hr 1.6/1.4 2550 80L to 11385'
17:35 - 18:05 0.50 DRILL P PROD1 Wiper to window
18:05 - 18:30 0.42 DRILL P PROD1 Begin tie-in at 10540'. ADD 10FT TO CTD.
18:30 - 19:00 0.50 DRILL P PROD1 RBIH TO BTM
19:00 - 19:20 0.33 DRILL P PROD1 ORIENT TF TO 1 OOL
19:20 - 21:30 2.17 DRILL P PROD1 DRILLED TO 11,418 FTWITH 90-100L TF, 1.6/1.3 BPM &
3100 PSI ON BTM. ROP NOSE-DIVED FROM @ 120FPH TO
35 FPH. DRILLING GETTING VERY RATTY WITH
FREQUENT STALLS FROM 200LBS woe. SAMPLES
INDICATE @1% PYRITE WITH MORE CONSOLIDATED
SAND FORMATION.
21 :30 - 22:30 1.00 DRILL P PROD1 DRILLED TO 11,439 FT WITH 90-100L TF, 1.6/1.1 BPM,
3100 PSI & 30 FPH ROP. PUMPING 20 BBL FLOPRO
SWEEP EVERY 80 BBLS. FLUID SYSTEM @ 80120
MUD/KCL. DRILLING GETTING BETTER.
22:30 - 22:35 0.08 DRILL P PROD1 P/U & ORIENT 1 CLICK.
22:35 - 22:55 0.33 DRILL P PROD1 DRILLED TO 11,449 FT WITH 90-1 OOL TF, 1.6 11.1 BPM,
3100 PSI & 30 FPH ROP.
22:55 - 00:00 1.08 DRILL P PROD1 ORIENT & DRILL TO 11,468 FTWITH 90-100L TF, 1.6/1.1
BPM, 3100 PSI & 32 FPH ROP. INCL = 86 DEGS.
10/4/2001 00:00 - 00:30 0.50 DRILL P PROD1 DRILL AHEAD TO 11,487 FT WITH 60-70L TF, 1.7/1.1 BPM,
3000 PSI & 34 FPH ROP. GETTING 180 DEGS REACTIVE.
00:30 - 01 :45 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW.
01 :45 - 02:15 0.50 DRILL P PROD1 DRILL TO 11,500 FTWITH 60-70L TF, 1.7/1.0 BPM, 3000
PSI & 30 FPH ROP. GETTING 200 DEGS REACTIVE WITH
GRADUAL INCREASE IN LOSS RATE. FLUID SYSTEM @
(
(
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 14 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/4/2001 01:45 - 02:15 0.50 DRILL P PROD1 80/20 MUD/KCL
02:15 - 02:40 0.42 DRILL P PROD1 ORIENT TF TO 60R.
02:40 - 03:30 0.83 DRILL P PROD1 DRILL TO 11,525 FT WITH 50-60R TF, 1.6/0.6 BPM, 3000
PSI & 30 FPH ROP. 1BPM LOSS RATE. LOW MUD/KCL
MIXTURE VOLUME. PUMPING BACK-UP FRESH FLOPRO
DOWNHOLE. MEANWHILE ORDERED FOR KCL FOR
POSSIBLE HOLE SWAP.
03:30 - 03:55 0.42 DRILL P PROD1 DRILL TO 11,541 FT WITH 26R TF, 1.6/0.6 BPM, 2900 PSI.
ROP UP TO 70FPH. LIKELY DROPPED INTO LESS
CONSOLIDATED ZONE.
03:55 - 04:10 0.25 DRILL P PROD1 ORIENT 1 CLICK & DRILL TO 11,548 FT WITH 60R TF, 1.61
0.6 BPM, 2900 PSI & 59 FPH ROP. INCL = 91 DEGS.
04:10 - 05:00 0.83 DRILL P PROD1 ORIENT & DRILL TO 11,600 FT WITH 90R TF, 1.6/0.8 BPM,
2800 PSI & 80 FPH ROP. INCL = 94 DEGS. STILL HAS NOT
SAMPLED ANY ZONE 1. GEOLOGIST DECIDE TO LOWER
TRAJECTORY FURTHER BY @ 30 FTVD TO ENCOUNTER
ZONE 1.
05:00 - 05:35 0.58 DRILL P PROD1 ORIENT LS & DRILL TO 11,625 FT WITH 150R TF, 1.6 / 0.8
BPM, 2800 PSI & 74 FPH ROP.
05:35 - 06:15 0.67 DRILL P PROD1 WIPER TRIP TO WINDOW.
06:15 - 06:30 0.25 DRILL P PROD1 TIE INTO GR @ 10540'. ADD 13 FT TO CTD.
06:30 - 07:00 0.50 DRILL P PROD1 RBIH TO BTM
07:00 - 08:15 1.25 DRILL P PROD1 DRILL TO 11,650 FT WITH 172R TF, 1.6/0.6 BPM, 2750 PSI
& 30 FPH ROP. DECIDE TO SWAP HOLE TO 2% SLICK KCL
WATER. START KCL DOWNHOLE.
08:15 - 10:20 2.08 DRILL P PROD1 DRILL TO 11,770 FT WITH 180LS TF, 1.6/0.6 BPM, 2750
PSI & 30 FPH ROP.
10:20 - 11 :40 1.33 DRILL P PROD1 11,77'0 FT WIPER TRIP TO WINDOW. CHASING 20 BBL
FLO-PRO SWEEP. ADDED KLA-GUARD TO KCL &
FLO-PRO = 10 LBS/BBL
11 :40 - 12:45 1.08 DRILL P PROD1 DRILLING AHEAD 120LS TF WITH KCL @ 70 FPH ROP. 0.5
BPM LOSSES.
12:45 -14:00 1.25 DRILL P PROD1 ENCOUNTERED HIGH GAMMA SHALE LAYER @ 11,810
FT.
14:00 -15:00 1.00 DRILL P PROD1 11,920' PUMP 20 BBL SWEEP OF MUD, DRILLING @ 80 FTI
HR
15:00 -16:15 1.25 DRILL P PROD1 11,950 FT, SHORT TRIP TO WINDOW CHASING FLO-PRO
SWEEP
16:15 - 17:15 1.00 DRILL P PROD1 DRILLING @ 60 L TF HIT SHALE AT 11,940' (8,716 FT TVD)
17:15 - 18:00 0.75 DRILL P PROD1 Trying to get thru shale. Now at 11960' 1.6/1.3 2000-2250 psi
depending if mud or KC!.
18:00 -19:30 1.50 DRILL P PROD1 DRILL SHALE TO 11,992 FT WITH 40-120L TF, 1.7/1.4
BPM, 2300/2600 PSI & 20 FPH ROP. STACKING AND
STALLING WITH ERATIC TF.
19:30 - 21 :15 1.75 DRILL P PROD1 DRILL SHALE TO 12,000 FTWITH 30-60L TF, 1.7/1.4 BPM,
2100/2300 PSI & 10 FPH ROP. STACKING AND STALLING
WITH ERA TIC TF.
21:15-21:45 0.50 DRILL P PROD1 BACK REAM SHALE SECTION TO 11,930 FT WITH HS-10L
TF AND ADD 1 DRUM LUBETEX TO ACTIVE SYSTEM TO
SEE IF ANY IMPROVEMENT.
21 :45 - 22:00 0.25 DRILL P PROD1 DRILL TO 12,026 FTWITH HS-10L TF, 1.6/1.3 BPM,
2100/2450 PSI & 30 FPH ROP. SLOW STACKING AND
STALLING. COMING OUT OF SHALE @ 12,014 FT.
('
("
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 15 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/4/2001 22:00 - 22:30 0.50 DRILL P PROD1 ORIENT TF TO 80-90L.
22:30 - 23:20 0.83 DRILL P PROD1 DRILL TO 12,068 FTWITH 80-90L TF,1.6/1.3 BPM,
2100/2300 PSI & 30 FPH ROP. ERRATIC TF. LOST
REACTIVE. ROP PICKING UP FROM 12,050 FT.
23:20 - 23:50 0.50 DRILL P PROD1 ORIENT TF TO 80-90L.
23:50 - 00:00 0.17 DRILL P PROD1 DRILL TO 12,089 FTWITH 80-90L TF,1.6/1.3 BPM,
2000/2300 PSI & 74 FPH ROP.
10/5/2001 00:00 - 00:30 0.50 DRILL P PROD1 DRILL TO 12,108 FTWITH 80-90L TF,1.6/1.3 BPM,
2000/2300 PSI & 60 FPH ROP. INCL = 83 DEGS.
00:30 - 01 :20 0.83 DRILL P PROD1 WIPER TRIP TO WINDOW. HOLE IN GOOD CONDITION.
01 :20 - 02:00 0.67 DRILL P PROD1 TIE INTO GR MARKER @ 10540'. ADD 28 FT TO CTD.
02:00 - 02:45 0.75 DRILL P PROD1 RBIH TO BTM
02:45 - 03:30 0.75 DRILL P PROD1 CHECK TF & DRILL TO 12,184 FT WITH HS-20L TF, 1.6/1.2
BPM, 2150/2500 PSI & 95 FPH ROP. INCL = 89 DEGS.
03:30 - 03:50 0.33 DRILL P PROD1 PIU & ORIENT TF TO 80-90L. PULL HEAVY - 20K OP.
03:50 - 04:15 0.42 DRILL P PROD1 DRILL TO 12,237 FT WITH 75-80L TF, 1.6 /1.2 BPM,
2150/2550 PSI & 110 FPH ROP. RE-LAND LATERAL TO 90
DEGS INCL @ 12,216 FT.
04:15 - 04:30 0.25 DRILL P PROD1 TF WALKING RIGHT. REORIENT TF TO 90L.
04:30 - 04:45 0.25 DRILL P PROD1 DRILL TO 12,260 FTWITH 90L TF, 1.6/1.2 BPM, 2150/2500
PSI & 130 FPH ROP.
04:45 - 05:25 0.67 DRILL P PROD1 WIPER TRIP TO WINDOW. HOLE IN GOOD CONDITION.
05:25 - 06:30 1.08 DRILL P PROD1 CHECKTF & DRILL TO 12290 FTWITH 90L TF, 1.6/1.3
BPM, 2100/2300 PSI & 100 FPH ROP.
06:30 - 07:10 0.67 DRILL P PROD1 Begin stacking, pulling tite (differential) 12290'. Drill to 12304'
wI difficulty. Phaze 2 declared for slick roads due to
unseasonal temps (32 deg) and rain
07:10 - 08:20 1.17 DRILL P PROD1 Wiper to window
08:20 - 10:00 1.67 DRILL P PROD1 POOH for weekly BOP test
10:00 -10:45 0.75 DRILL P PROD1 LD drilling BHA. Bit like new. MWD pulser was fluid cut which
explains erratic data over last several hours
10:45 - 14:00 3.25 DRILL P PROD1 Weekly BOPE test. Witness waived by AOGCC
14:00 - 15:15 1.25 DRILL N RREP PROD1 Repair hyd fluid leak in line from accumulator
15:15 -18:30 3.25 DRILL P PROD1 Fin test BOPE
18:30 -19:30 1.00 DRILL P PROD1 RIU & fill hole with 17 bbls fluid.
19:30 - 20:05 0.58 DRILL P PROD1 M/U BHA #22.
20:05 - 20:45 0.67 DRILL P PROD1 RIH BHA #22 TO 2,500 FT. SHALLOW HOLE TEST OK. FILL
HOLE WITH 45 BBLS FLUID.
20:45 - 22:35 1.83 DRILL P PROD1 CONTINUE RIH TO 10,540 FT.
22:35 - 22:45 0.17 DRILL P PROD1 TIE INTO GR @ 10,540'. ADD 16 FT TO CTD. UP WT. = 25K,
DOWN WT = 12K.
22:45 - 23:35 0.83 DRILL P PROD1 CONTINUE RIH & STACKED OUT @ 11,989 FT [SHALE
SECTION]. WORKED THRU WITH PUMPS OFF.
23:35 - 00:00 0.42 DRILL P PROD1 BACKREAM THRU AND TRY TO WORK TIGHT SPOTS.
10/6/2001 00:00 - 00:30 0.50 DRILL N RREP PROD1 REPAIR FAULTY SCR CIRCUIT BREAKER
00:30 - 01 :10 0.67 DRILL P PROD1 BACKREAM THRU AND WORK TIGHT SPOTS OVER
SHALE SECTION FROM 11,977 FTTO 12,040 FT.
01:10-01:20 0.17 DRILL P PROD1 CONTINUE RIH BHA #22 TO BTM TAGGED @ 12,304 FT.
01:20 - 01:25 0.08 DRILL P PROD1 ORIENT TF TO HS.
01:25 - 01:50 0.42 DRILL P PROD1 DRILL TO 12,344 FT WITH HS TF, 1.7/0.9 BPM, 2000/2600
PSI & 96 FPH ROP. ROP. INCL = 89.8 DEGS.
01:50 - 02:10 0.33 DRILL P PROD1 ORIENT TF TO 90L.
02:10 - 02:40 0.50 DRILL P PROD1 DRILL TO 12,401 FTWITH 90L TF, 1.7/0.9 BPM, 200012600
('
('
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 16 of 19
Operations Summary Report
Legal Well Name: 1 5-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/6/2001 02:10 - 02:40 0.50 DRILL P PROD1 PSI & 150 FPH Rap. INCL = 91.5 DEGS. OCCASIONAL WT
STACKING.
02:40 - 02:45 0.08 DRILL P PROD1 ORIENT TF TO 30L.
02:45 - 02:55 0.17 DRILL P PROD1 DRILL TO 12,430 FTWITH 30L TF, 1.7/0.9 BPM, 2000/2900
PSI & 150 FPH Rap. FREQUENT WT STACKING.
02:55 - 03:00 0.08 DRILL P PROD1 ORIENT & GOT DIFFERENTIALLY STUCK.
03:00 - 03:30 0.50 DRILL N STUC PROD1 SHUT DOWN PUMPS. STACK DOWN 6KAND RELAX
STRING FOR 30 MINUTES. PULL PIPE FREE WITH 57K.
03:30 - 05:00 1.50 DRILL P PROD1 WIPER TRIP TO WINDOW.
05:00 - 05:30 0.50 DRILL P PROD1 TIE INTO GR MARKER @ 10540'. ADD 26 FT TO CTD.
05:30 - 06:20 0.83 DRILL P PROD1 RBIH TO BTM. NO BOBBLES OVER SHALE SECTION.
06:20 - 06:30 0.17 DRILL P PROD1 ORIENT TF TO 90-100L.
06:30 - 07:05 0.58 DRILL P PROD1 Drill from 12430-530' 1.7/0.92550 at 70L by spudding.
Frequent differential overpulls. Now at 92.3 deg
07:05 - 07:55 0.83 DRILL P PROD1 Wiper to window
07:55 - 08:30 0.58 DRILL P PROD1 Tie-in, add 12.0'
08:30 - 09:30 1.00 DRILL P PROD1 RIH to TD. Work to get thru shales at 12000' starting from set
down at 11984' (10 min)
09:30 - 09:45 0.25 DRILL P PROD1 Tag at 12530'. Orient around
09:45 - 12:00 2.25 DRILL P PROD1 Drill (like a cable tool rig) from 12530-618' 1.7/0.92550 115L
while work thru a shale at 12565'. Acting like lockup after
getting to 12618'
12:00 -12:15 0.25 DRILL P PROD1 Survey, then wiper to window
12:15 -12:40 0.42 DRILL P PROD1 Log gap in GR from 12130-12090'
12:40 - 13:25 0.75 DRILL P PROD1 Resume wiper
13:25 - 14:25 1.00 DRILL P PROD1 Begin tie-in from 10540'
14:25 - 15:25 1.00 DRILL P PROD1 Add 18.0', RIH. Set down at 11980'. Work to get thru shales
and got thru wo pump
15:25 - 15:40 0.25 DRILL P PROD1 Tag at 12623'. Orient from 90R to 90L
15:40 - 16:40 1.00 DRILL P PROD1 Spud a few times and took off drilling (GR showed a minor
shale at 12620'). Drill from 12623-736' 1.7/0.92800 (new mud)
90L and lost momentum at 12736'
16:40 - 17:55 1.25 DRILL P PROD1 Wiper to window from 12736'. Wipe liner to near EaT at
10300'. RIH
17:55 - 18:20 0.42 DRILL P PROD1 Begin tie-in from 10530' 1.7/0.92350 40L. Add 15' to CTD.
18:20 - 19:30 1.17 DRILL P PROD1 RBIH TO BTM TAGGED@ 12,735 FT. NO BOBBLES OVER
SHALE SECTION.
19:30 - 19:55 0.42 DRILL P PROD1 WEAK MWD PULSES. CYCLE PUMPS & CHECK TF @ 28R.
ORIENT TF TO 15L.
19:55 - 22:00 2.08 DRILL P PROD1 SPUD A COUPLE TIMES & FINALLY PUSHED TO 12,770 FT.
NO FURTHER PROGRESS. CALL TD.
22:00 - 23:15 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW.
23:15 - 23:40 0.42 DRILL P PROD1 TIE INTO GR MARKER @ 10540'. ADD 17 FT TO CTD.
23:40 - 00:00 0.33 DRILL P PROD1 RBIH.
10/7/2001 00:00 - 00:40 0.67 DRILL P PROD1 CONTINUE RBIH TO TD TAGGED @ 12,777 FT. NO
BOBBLES OVER SHALE SECTION.
00:40 - 01 :10 0.50 DRILL P PROD1 CIRCULATE HOLE CLEAN.
01 :10 - 03:30 2.33 DRILL P PROD1 POOH LAYING-IN CLEAN FLO-PRO MUD IN OPEN HOLE.
PAINTED EOP FLAGS @ 10,200 FT & 8,150 FT.
03:30 - 04:10 0.67 DRILL P PROD1 UD DRILLING BHA#22.
04:10 - 04:30 0.33 CASE P COMP RU FLOOR TO RUN 2-3/8" LINER.
04:30 - 04:45 0.25 CASE P CaMP HELD SAFETY MEETING ON RUNNING OF LINER.
MEANWHILE FILL HOLE WITH 6 BBLS AND CONFIRM
(
('
-
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 17 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
1 0/7/2001 04:30 - 04:45 0.25 CASE P COMP STATIC LOSSES @ 6 BBLS/HR.
04:45 - 06:15 1.50 CASE P COMP MIU & RIH 1 JT OF 2-3/8", FL4S LINER X/OVER TO 75 JTS
OF 2-3/8" STL LINER AND JEWELRY AS PER PROGRAM.
06:15 - 06:30 0.25 CASE P COMP CREW CHANGE SAFETY MEETING. MEANWHILE FILL
LINER.
06:30 - 09:00 2.50 CASE P COMP CONTINUE RIH 2-3/8" STL LINER AND JEWELRY AS PER
PROGRAM.
09:00 - 09:15 0.25 CASE P COMP Safety mtg re: CSH
09:15-12:15 3.00 CASE P COMP MU Baker stinger. MU 79 jts 1" CSH workstring. Stung into
Backdoor flapper 1 jt early
12:15 -12:30 0.25 CASE P COMP Determine that one jt of 2-3/8" liner was mistakenly left out of
planned tally (marker jt was counted as a full jt). Safety mtg re:
non routine event
12:30 - 13:30 1.00 CASE N HMAN COMP Strip over CSH wI two 10' 2-3/8" 4.7# L-80 STL pup jts and
space out CSH
13:30 - 14:25 0.92 CASE P COMP Pressure test seals in O-ring sub to 500 psi. Install CTLRT
with stinger 15' into O-ring seal assy (a total of 80 jts and one
CSH pup)
14:25 - 15:45 1.33 CASE P COMP RIH wI CT and liner BHA (2517' OA)
15:45 - 16:20 0.58 CASE P COMP 10667' Corr -16.8' at flag. PUH 38.1 K. RIH 15K thru window
and head to TD at 65'/min losing 0.4 bpm to surge
16:20 - 17:05 0.75 CASE P COMP Tag TD at 12777' CTD with + 7k string wt (hole was clean to
TD). Recip 30' at 35.8k. Load 5/8" steel ball. Displace wI
mudlKCI mix 1.3/0.6 3800 to seat. Pressure up to 4400 psi to
blowout ball seat. Release from liner at 28k
RU DS cementers
17:05 - 18:05 1.00 CASE P COMP Begin displacement to KCI. Batch up cement. 1.6/1.3 3700
with KCI in annulus
18:05 -18:20 0.25 CASE P COMP Safety mtg re: cmt
18:20 -19:30 1.17 CASE P COMP DS PT @ 4000 psi. Load CT wI 20 bbls 15.8 ppg G cement wI
latex @ 1.2/1.0 2600. Displace wI KCI water, under-displacing
by 2bbls. Had 13.5 bbls cement behind shoe. CIP @ 19:30
Hrs.
19:30 - 20:10 0.67 CASE P COMP UNSTING FROM POB. FLOATS HELD OK. LAY-IN
REMAINING 2 BBLS OF CEMENT WHILE PUH TO 11750 FT.
PUMP 30 BBLS BIOZAN AND DISPLACE TO NOZZLE @
1.8/1.8 BPM & 4000 PSI.
20:10 - 20:35 0.42 CASE P COMP RBIH DILUTINGICIRCULATION OUT CEMENT WITH
BIOZAN @ 1.7/1.9 BPM & 4250 PSI. GOT BACK @ 3-5 BBLS
EXCESS CMT FROM BEHIND LINER FOLLOWED BY 2
BBLS CONTAMINATED [UNDERDISPLACED] CMT.
20:35 - 22:10 1.58 CASE P COMP CIRCULATE OOH. DISCOVERED PINHOLE IN CT@ 2150
FT. INSPECT PINHOLE - IMPRINT LOOKS LIKE ROLLER
BEARING GOUGE.
22:10 - 22:40 0.50 CASE N SFAL COMP INSPECT INJECTOR ROLLER BEARINGS FOR ANY
ANOMALY - NOTHING AMISS?? [4 BEARINGS WERE
CHANGED OUT LAST MONTH].
22:40 - 23:00 0.33 CASE P COMP CONTINUE POOH CTLRT. STANDBACK INJECTOR.
23:00 - 00:00 1.00 CASE N SFAL COMP PURGE COIL. RIU TO CUT 2,150 FT CT. HELD PJSM.
10/8/2001 00:00 - 01 :45 1.75 CASE N SFAL COMP CUT OFF 2,150 FT CT. RE-HEAD CTC. PULL / PRESS TEST
CTC - OK.
01 :45 - 03:45 2.00 CASE P COMP UD CTLRT & STAND BACK CSH.
03:45 - 04:00 0.25 EVAL P COMP PJSM ON PIU 1" CHS TBG AND MCNUGR/CCL TOOLS.
('
f
Printed: 10/15/2001 12:45:12 PM
BP EXPLORATION Page 18 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/8/2001 04:00 - 05:00 1.00 EVAL P COMP MU SWS MCNUGRlCCL TOOLS. RIH ON 18 JTS 1" CSH
WORKSTRING. OBSERVE BOT 1" 'LYT' ELEVATOR
SPRING APART WITH MISALIGNED DIES SECTIONS.
STOP RIH. CONTACT BOT.
05:00 - 06:50 1.83 EVAL N SFAL COMP BOT P/U ELEVATOR TO SHOP AND FIX SAME.
06:50 - 08:10 1.33 EVAL P COMP Resume MU CSH workstring
08:10 - 09:30 1.33 EVAL P COMP RIH w/ CT
09:30 - 11 :00 1.50 EVAL P COMP Begin logging down at 30'/min from 10150'
11:00 -12:30 1.50 EVAL P COMP Tag at 12721' CTD. Begin logging up at 30'/min while leaving
fresh Flo Pro in liner
12:30 -13:30 1.00 EVAL P COMP POOH wI CT
13:30 -14:50 1.33 EVAL P COMP Standback CSH workstring
14:50 - 15:00 0.17 EVAL P COMP Safety mtg re: source
15:00 -15:20 0.33 EVAL P COMP LD logging tool
15:20 -15:45 0.42 EVAL P COMP Download data. PBD is 12742' (2' deeper than pipe tally)
15:45 -16:45 1.00 PERF P COMP Pressure test wellbore to 2000 psi. After 1 min 1900 psi, 5 min
1750, 15 min 1500, 30 min 1250,45 min 1150. No change in
IA.
Load perf guns in pipeshed. Fax log to town
16:45 -18:45 2.00 PERF P COMP Make minor change to proposed perfs to test SWS eFire
system. WO SWS to get a 10' spacer to shoot desired interval
18:45 -19:00 0.25 PERF P COMP SAFETY MTG RE: PERF GUNS
19:00 - 20:30 1.50 PERF P COMP M/U 33 JTS OF 1-11/16" SWS PERF GUNS
20:30 - 21 :45 1.25 PERF P COMP M/U 30 STANDS 1" CSH WORKSTRING
21 :45 - 00:00 2.25 PERF P COMP RIH WI CT.
10/9/2001 00:00 - 00:15 0.25 PERF P COMP TAG AT 12,725 FT CTD. PIU & RE-TAG @ SAME DEPTH.
CALL IT PBTD & CORRECT TO 12,742 FT. PUH TO SET
DEPTH OF 12,720.7 FT WITH BTM SHOT @ 12,720 FT.
00:15 - 00:40 0.42 PERF P COMP LINE UP AND FILL HOLE. SHUT-IN CHOKE. SET-UP
SEISMIC DETECTOR TO LUBRICATOR FOR SHOT
DETECTION. DRILLER PRACTICE PUMPING PROCEDURE
FOR FIRING E-FIRE HEAD.
00:40 - 00:55 0.25 PERF P COMP PRESURE-UP WELLHEAD TO 400 PSI & HOLD FOR 1 MIN.
INCREASE PRESSURE TO 600 PSI & HOLD FOR 1 MIN.
DUMP PRESSURE TO 0 PSI & WAIT FOR 2 MINS.
CRANK-UP TO 1200 PSI & WAIT FOR 2 MINS. BLEED OFF
TO 0 PSI AND WAIT FOR 5 MINS. OBSERVE E-FIRE HEAD
SHOOT WITH INDICATION VIA SEISMIC DETECTOR. PERF
INTERVAL: 12714 FT - 12720 FT.
00:55 - 01 :45 0.83 PERF P COMP LOAD CT WITH 10 BBLS FLO-PRO. LOAD 1/2" STEEL
BALL. DISPLACE WITH 2% KCL. LOWER RATE AFTER 28
BBLSAWAY.
01:45 - 01:50 0.08 PERF P COMP BALL ON SEAT AT 32 BBLS & FIRED AT 2450 PSI WITH
PRESSURE DROP & SEISMIC DETECTOR INDICATIONS.
PERF INTERVALS: 12040 FT -12363 FT & 12401 FT - 12704
FT.
01 :50 - 04:00 2.17 PERF P COMP POOH FILLING FROM BS. MONITOR WELL FOR 10 MINS @
8,200 FT - STABLE. CONTINUE POOH. MONITOR WELL -
STABLE.
04:00 - 05:15 1.25 PERF P COMP STAND BACK 30 STANDS OF 1" CS HYDRIL.
05:15 - 05:45 0.50 PERF P COMP PJSM & RlU TO UD PERF GUNS. MEANWHILE MONITOR
LOSSES - HOLE STABLE.
05:45 - 06:15 0.50 PERF P COMP UD PERF GUNS.
('
("
Printed: 10/15/2001 12:45:12 PM
("
("
BP EXPLORATION Page 19 of 19
Operations Summary Report
Legal Well Name: 15-41
Common Well Name: 15-41 B Spud Date: 7/22/1994
Event Name: REENTER+COMPLETE Start: 9/21/2001 End: 10/9/2001
Contractor Name: NORDIC CALISTA Rig Release: 10/9/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/9/2001 06:15 - 06:30 0.25 PERF P CaMP CREW CHANGE SAFETY MEETING. RE: UD PERF GUNS
06:30 - 08:15 1.75 PERF P CaMP CONTINUE UD 33 JTS OF 1-11/16" SWS PERF GUNS. ASF.
Load out guns
08:15 - 08:25 0.17 RIGD P CaMP Safety mtg re: CSH
08:25 - 09:05 0.67 RIGD P COMP RIH wI CSH workstring in doubles
09:05 - 10:05 1.00 RIGD N SFAL CaMP Repair YT elevators (hard to close. BOT drop off another set)
10:05 - 11 :00 0.92 RIGD P COMP Resume RIH wI CSH
11 :00 - 12:00 1.00 RIGD P CaMP POOH LDDP
12:00 -12:15 0.25 RIGD P CaMP Safety mtg re: crew change/CSH
12:15 -13:45 1.50 RIGD P CaMP Resume POOH LDDP
13:45 - 16:00 2.25 RIGD P CaMP RU nozzle assy. Install new depth encoder. RIH pumping
MeOH. FP well to 2000' wI MeOH. POOH
16:00 -17:00 1.00 RIGD P CaMP SI swab, secure well. Blow back reel with air. Load out misc
equipment
17:00 - 19:00 2.00 RIGD P CaMP ND BOPE. NU tree cap and test
19:00 - 0.00 RIGD P CaMP Rig released at 1900 hrs 10/9/01. TT 18:3:30
Printed: 10/15/2001 12:45:12 PM
(
BP Amoco
Baker Hughes INTEQ Survey Report
('
8..
....
h~T EQ
- ObP
,..,-..--.-- --- -- ----- -.---------------.---.-----.-------.--------------------"-----'---',_---,------ ------- ----'-'----"---------------' ---.-,
, Company: BP Amoco
I Field: Prudhoe Bay
Site: PB DS 15
Well: 15-41
: Wellpatb: 15-41BPB1
.. --,'----.--"u_- .--".---.-..,--,--------.-----,---_u_--,-------,.-.-..------'------' .__-.--n______------._u_--.-- '------'----'------'-----'-'---------'-'---'u"'" _"mu_.__m,_- -- -------.--...-,---. ---'-
,- --- . -- -- ----...--- '-'-- -----,_.. .un....-__-_. -- -- '---"---------'---'--'----_u_'u_,--.--u.--------.---o.
Date: 1 0/2312001 Time: 1 0:45:23 Page: 1
Co-Grdinate(NE) Reference: Well: 15-41, True North
Vertical (fVD) Reference: 58: 41 7/22/199400:0066.2
Section (VS) Reference: Well (0.00N,0.00E,353.81Azi)
Survey Calculation Method: Minimum Curvature ' Db: Oracle
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
I Geo Datum: NAD27 (Clarke 1866)
I Sys Datum: Mean Sea level
Field:
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
. ._.m no.
----._------
u_--------.-------. -o.- ----------.-..----, --.----...-----.--.------------..----------.---,--
, Site:
--
PB DS 15
TR-11-14
UNITED STATES: North Slope
Site Position: Northing: 5958837.36 ft Latitude: 70 17 35.236 N
From: Map Easting: 676296.98 ft Longitude: 148 34 21.213 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.34 deg
"_--_00__"_._---'---- '--------'-'---'--U---'--'-------'---'--U-------_-'---_..m___----'--'----__.___n.--_u_.-------.--.. ----
--.---.-- ----_. -----------
--.._--- --"'-'----,- --.--.- - - '--.u_---.--- -------_.--- -'--.- --
---. --. ----_._-,------- ,-.
'--'-_-____m. .----_u_, "'----'--------------'---'-"'--'_'.__.m_____.._---,-,-------'----'-'-'-- ---------,-...--.----- _"'00__'-
n_,.--m..
Well: 15-41
15-41
Well Position: +N/-S 1176.23 ft Northing:
+E/-W 379.93 ft Easting :
Position Uncertainty: 0.00 ft
Slot Name:
41
5960022.1 0 ft
676649.20 ft
Latitude:
Longitude:
70 17 46.805 N
148 34 10.139 W
..- .....-----...... .-.. ..
-,---..-----..-.-..... '..n"u",- --"..--..-,----.------ .-...,. -"-""'----"'-'----_'___'00__--___-------.- u_.--m...___.._-----..----.---....... .....-..--- "--.,-..---.-..,-..' ...----- -....
-- ..,..,..-----.......,..-.... '-"-.-....------,---....-.....---- "'----'---"'-'--"'----"'----""-'-'-"""'---------,--,----,--""'-"--------'--__n"-__"_,----,---,---"--------,-""""-,,,,------------"----'-------___..._m__-- ....-...... ..-
Wellpath: 15-41BPB1
500292249271
Current Datum: 58: 417/22/199400:00
Magnetic Data: 10/23/2001
Field Strength: 57504 nT
Vertical Section: Depth From (TVD)
ft
. .-.. .-....--- .. -,,'p"" - ...--..---.
0.00
Drilled From:
Tie-on Depth:
Height 66.25 ft Above System Datum:
Declination:
Mag Dip Angle:
+N/-S +E/-W
ft ft
....-.-- '----"---"-""'-"'--'-'m--__..._-..---.--- "----'-',,"--__...__n.._.
0.00 0.00
15-41
10690.00 ft
Mean Sea Level
26.59 deg
80.81 deg
Direction
deg
..-........-...,-,---..-..
353.81
.....--.... -....- ... "'__U'.'-'--"""'_"-'--'_._.._._.._.__.._.,.._.......__.__.._~....~-------".__.._------,....._--.._--_.._---_._-----_..._---.....,.-------.....-..--...-,. .
.. -..--....-...-.............,--,--. ........,--... - ,---- -,-...----.. .........---------,--....---...,.. .-....---.--.----....--------.......-,---,-,-----,....---...-.--....-.-'----'-'--""""'-"'-"----'-------'-"'----""""'-"-'------,,--,-.---....-- ...
Survey:
MWD
Start Date:
9/26/2001
Company: Baker Hughes INTEQ
Tool: MWD,MWD - Standard
Engineer:
Tied-to:
From: Definitive Path
..--....---...-..,,------ '-'--""'-.-.. ...._u_--...---...-...- -""-"""-""""---""---"""""'------------....-..-..-..,----,-.......--- ..---.-----..------...,...-,---...... "-""""'-"'-"'---"-""-" ",,"'-" .---, -......-.. ""'... '-'"
Annotation
10690.00
11278.00
ft
8524.43
8747.27
KOP
TD
Survey
:.._,--,......_-----.._.._-"......,.....~""...._-" "---'-C-""""'.--."'----."""':'-.-""-~'C--"'-"~"'-"""'C,-"--:-:-"""-"",-",-",-~",-,--c-:-,-"""-,,,,,,,,,..,.._-,......,-..7""',~--~-,--;",-"""""--"",~---,--""",--~",--",---c,,.,,":--,"""-""""""',",-"-~'-""""---."""~""--""'------".-""'. """"-"""'-'---""..--.."""""""" """"""."'..'-"""""-'-"" """""'-""--"""""""",,--T
MD,Incl.,Aiim ..TVD' ,SSirvP ,N/S,. .'. ,EfW, . ,l\1apN ,MapE, .. DLS VS
..... "_....,,....,~-,.._..,!.,_.,._----,,',---, ""-"~;~..~-,_._..,_. .,.,~.,~..~,~J__!,:"_,............!!,_..~.._~"._,c_'_,:",:_!~-~....--.:~~..,..,;,..._.~~:_'.,,-_:_...,:.....:..~~,..,~.,:,,_._,~.~---.~!!:....,.,_:,.__...",.:_~,:...:..__...~~_..,-"....".:.~~~(,~ge~_, .....,.,._1!:.,... ,......"...",,--- ,-
10690.00 11.40 0.29 8524.43 8458.18 5431.13 -1018.17 5965427.45 675503.73 0.00 5509.26
10738.35 28.56 27.70 8569.78 8503.53 5446.28 -1012.72 5965442.72 675508.82 39.53 5523.73
10777.62 36.91 49.89 8602.91 8536.66 5462.27 -999.27 5965459.03 675521.90 36.93 5538.18
10812.87 44.82 57.28 8629.56 8563.31 5475.84 -980.68 5965473.03 675540.16 26.27 5549.66
10843.10 50.54 73.10 8649.97 8583.72 5485.03 -960.46 5965482.69 675560.15 42.97 5556.62
10877.73 55.63 74.50 8670.77 8604.52 5492.74 -933.88 5965491.02 675586.54 15.05 5561.42
10910.33 56.43 83.99 8689.01 8622.76 5497.77 -907.37 5965496.67 675612.93 24.26 5563.56
10946.98 57.13 94.19 8709.13 8642.88 5498.24 -876.77 5965497.86 675643.50 23.35 5560.73
10978.93 62.40 98.41 8725.22 8658.97 5495.19 -849.36 5965495.45 675670.98 20.05 5554.74
11013.25 66.62 105.09 8740.00 8673.75 5488.85 -819.07 5965489.83 675701.41 21.44 5545.17
11048.56 73.39 107.55 8752.06 8685.81 5479.52 - 787 .25 5965481.25 675733.44 20.26 5532.46
11088.61 82.18 105.79 8760.53 8694.28 5468.31 -749.78 5965470.93 675771.15 22.36 5517.28
11130.61 92.29 106.14 8762.55 8696.30 5456.79 -709.50 5965460.36 675811.69 24.09 5501.48
11161.46 96.59 112.47 8760.16 8693.91 5446.63 -680.50 5965450.89 675840.93 24.75 5488.25
11196.21 98.17 119.85 8755.69 8689.44 5431.45 -649.59 5965436.44 675872.18 21.55 5469.83
11242.41 95.01 128.64 8750.38 8684.13 5405.65 -611.70 5965411.53 675910.66 20.10 5440.09
11278.00 95.01 128.64 8747.27 8681.02 5383.51 -584.00 5965390.05 675938.87 0.00 5415.09
""""-"""""'--.-,..-,..-.........---------.-.--....,---...,....-..-...-...-.... """'-'-""'--" ,.. -., ,-,..,.. ',,"'-___...--m--__..._-----.-..,----...........
'"
'"
N
M
N
'"
t
0
Z
~
U)
...J
;; N
f- '"
W '"
'" "'~
:r :;ON
~ :2~
...J '"
¡;j '"
"
CD
~
0
0
io
0
0
CD
"'
~
:¡j
"
g>1::
'EE <:>
~ e '" z
U)U- '" 0
¡::
<
:;;:
'" IX
'" 0
<:> LL
~
W
g ~
0 lU
IX
w
LL
W
IX
§~ g
1).:1 g
U) ~
"" :>
Ii!
CD
~
CD
~
~
~
~
~
0
0
2
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 a 0 0
¡;; [1.I~nj6o,f(+)tJJgN!(:)q¡~os~
0
a
"
L~
Qi Qi Qi à,-o
00000
CCCC.r::
'"'"'"'"1;)
mmmm:;;:
&&&&[5
WõûJ£~
b': :;:.%ij
2:::-[5;8
~~U
9;"; æ
8 :;;:
0
"
~ 150
if> « z>-
z
0
$
0
z
z
«
0 00
~ i~
0 row
~ §ê
¡¡
¡¡:
'"
'i2
.~
a
a
"
"
0
0
'J
a
0
N
"
a
"'
;;;
0
a
N
00
0
"'
N
00
CD
"
f?
0
a
:;:
0
a
a
a
0
æ
0
0
00
a
:::'
0
0
CD
~
¡¡:
~
0
a
,~
0
'i'
'i2
0
a
co
0
0
N
a
0
a
a
0
a
,":""",
....
0
0
'?
0
a
-r
a
0
"?
a
0
'"
a
0
~
0
a
9
a
0
'1'
0
a
0
0
0
0
0
N
0
0
co
'";'
0
a
~
0
0
"'
'";'
g
CD
'";'
0
0
c-
'";'
0
0
0
"
~
f
0
"'
c-
oo
0
a
00
00
0
0
B
a
"'
B
0
0
~
¿
-<
'<t
":1:
0
0
"'
"
'?
0
0
"'
'1
0
cO
"'
'?
0
0
CD
'?
0)
"'
CD
'?
0)
0
~
....
0
0
N
(;?
N
Ô
....
0
"'
c-
'?
0
0
00
'?
0
LO
00
'?
0)
0
Q
'?
0)
"'
æ
'?
0
0
~
0)
is
'T
0
a
:;¡
0)
"' 0
:;¡g
~o
'T1i')
5;;'\1'"
N
,,"'"
0 1\1
0)
'i' ã
0-
~õ
0 GI
~IJ)
gi
" u
g~
;' G
0>
t2
"
0)
0
CD
-r
0
"'
CD
'T
0
0)
'r
0)
"'
'r
0
0)
00
'T
0
"'
00
'T
0)
0)
0)
-r
0)
"'
æ
-r
0
0
0
u¡
0
is
'7
0
0
zç;
0
cO
"?
0
0
N
"?
0
"'
N
'7
0
cO
00
00
0)
0
0)
00
. ObP
('
(
BP Amoco
Baker Hughes INTEQ Survey Report
iii..
am..
lNT EQ
,--,-, .--- -",--,--,--,"--.---.'--'.'--' -,_. "'--'-'- . .,--- --"-"--- -.------.-,.---' ",--""---,----,----------.--,,.,._----------------------,-.--_..- -...--------- -.----- ,...,---- ------_.. ..--.-- _. '--.--'--,
Company: BP Amoco
Field: Prudhoe Bay
Site: PB DS 15
Well: 15-41
Wellpath: 15-41B
Date: 10/23/2001 Time: 10:47:02 Page: 1
Co-ordinate(NE) Reference: Well: 15-41, True North
Vertical (fVD) Reference: 58: 41 7/22/199400:0066.2
Section (VS) Reference: Well (0.00N,O.00E.150.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field:
---------...-.,,------_u..,.--,......-.____.H.___-- ,_.---- -- --"'_'_'.n..'..'-..-.-'--'.'-.'------ -----. ----..,-.,--.---------------.--__.UO_n..---.__--___m__,_._-------,.. -,-- ,'... "-- _..u -. --u.
. . - . -' . -- ,- . . - -
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
: Sys Datum: Mean Sea Level
PB DS 15
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
Site:
Well: 15-41
15-41
Well Position: +N/-S 1176.23 ft
+E/-W 379.93 ft
Position Uncertainty: 0.00 ft
. ." - ..
Northing:
Easting :
5958837.36 ft
676296.98 ft
5960022.10 ft
676649.20 ft
.. -..,-.---.-------."
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
- ---.. .--
Latitude: 70 17 35.236 N
Longitude: 148 34 21.213 W
North Reference: True
Grid Convergence: 1.34 deg
.-. - -- - .
Slot Name:
Latitude:
Longitude:
-, ._---- ... --_.-.- ..,. -, - -, -- - '---'
41
70 17 46.805 N
148 34 10.139 W
..,,----_.,.. '---...---.------."----- .--.--.,.-,---.-.,".----.,.-. -,--u_--,-_...---,--- ..." ..---' ,---.-".. --_.,-_u_,-,._-,,- .-.-.--
Wellpath: 15-41 B
500292249202
Current Datum: 58: 417/22/199400:00
Magnetic Data: 7/10/2001
Field Strength: 57500 nT
Vertical Section: Depth From (TVD)
ft
0.00
Survey:
MWD
Company: Baker Hughes INTEQ
Tool: MWD,MWD - Standard
Annotation
Height
+N/-S
ft
0.00
66.25 ft
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
15-41
10705.00 ft
Mean Sea Level
26.69 deg
80.80 deg
Direction
deg
- , ,-,..,-- -'----
150.00
.,.,.. m ,_.,._--"- ,- ,--_.-,-"" -.-----------..---.,..---.,- ,.----,----...--.--,,--.-...,--..----.------_'___.m_.__.--._".,,--,.. ---,--_.._'.
-_..,..."-----,--,---,,,._.,---,---""'---"'-'u-- -"-.-..-".,,----.----,----...".-- .--
Start Date:
..-.,._,---_..,._--,-_._.,._,,---,--'_u._,,--,-,--, ..'-.",'h"
Engineer:
Tied-to:
."---,.,.,,-,.,-,,,-,_.,-,---,-_.,-'-'"
1 0/6/2001
.- .,---- ,.. ..-,..
From: Definitive Path
MD
ft
10705.00
12777.00
8539.13
8799.91
KOP
TD
._---,------_._---,--'------_.--'----_._'---"-------'--_d.._,--_---'-.--'-""--.-"'--'" ,_m_'-'--.._'---'-,-",,---,---,--,----, .".---..---.--.--..",---,--..-,
.. -'" -.. ..,...-. - -"""",_... ...- ..-----"..-- ,...--,-_.
Survey
..----..-..---............"" ",--,"""--d_..um.....",_.......,..--,.-_'d"'_""""'"-,,,,--,,-.--,,--,---""_"_""'dU."__",-",--,,,-,..------__"_'_m,.......-__m..m....._..".-"-.-""--""""----,-",,,,,,,----"""""""'d_-"'-""""""""""d- ",..--....",
Id
MD
ft
......" ._..-""-""."'",,-,,,
1 0705.00
1 0760.69
10796.99
1 0827.49
10858.81
Incl
."..-~:~"...
11.59
22.41
29.79
32.08
40.52
10890.94
10931.86
10961.04
11000.44
11033.16
11068.09
11103.54
11138.46
11169.34
11200.31
48.96
60.38
68.99
79.37
84.38
88.68
88.95
89.91
91.05
91.05
11236.84
11267.36
11298.89
91.76
91.67
89.47
Azim TVD SSTVD
deg 'ft. ,,"ft ""
....-..:"",._"-"..,,_.,.,,-,-_.,:._-_.._.,_...._,,,,~...~--:.,.....".:,.."c_.";"c"_."-".,,..',,.
0.32 8539.13 8472.88
65.00 8592.71 8526.46
89.97 8625.38 8559.13
114.58 8651.64 8585.39
118.80 8676.87 8610.62
N/S E/W MapN MapE DLS
.._._.."..~,.....--.'_._":.,,....._._,--_c~_.:,_._,....-....:,.:...,.:!!:_L..~,._..._.,.,-_._.--_....!~..'~.,-, ...-.". ,. ."_.~~~(Jgq~...
5434.12 -1018.15 5965430.44 675503.68 0.00
5444.30 -1008.40 5965440.85 675513.19 36.31
5447.25 -993.04 5965444.15 675528.47 36.06
5443.87 -978.04 5965441.13 675543.55 41.90
5435.49 -961.53 5965433.14 675560.25 28.09
125.48
123.02
121.26
124.07
125.48
128.29
133.92
139.89
145.17
153.60
156.77
154.66
153.60
8699.68
8723.31
8735.77
8746.50
8751.13
8753.24
8753.97
8754.32
8754.06
8753.49
8752.60
8751.68
8751.37
8633.43
8657.06
8669.52
8680.25
8684.88
8686.99
8687.72
8688.07
8687.81
8687.24
8686.35
8685.43
8685.12
5423.40
5404.69
5390.68
5370.23
5351.76
5330.84
5307.55
5282.06
5257.56
5230.94
-942.47
-914.89
-892.57
-860.72
-834.12
-806.25
-779.55
-755.71
-736.93
-721.17
5197.79
5169.99
5141.62
-705.85
-693.30
-679.55
'-"'""- -,..,-.".,."-"---.,,.-..-..----..-----....--,,. _,,_'.'h""_._..--"".-'
5965421.50
5965403.45
5965389.97
5965370.27
5965352.43
5965332.18
5965309.52
5965284.60
5965260.55
5965234.31
5965201.54
5965174.04
5965146.00
--- -".,.""""""",,---- ...'
675579.59
675607.59
675630.24
675662.56
675689.58
675717.94
675745.17
675769.61
675788.95
675805.33
675821.43
675834.62
675849.04
30.04
28.33
30.00
27.22
15.89
14.70
15.90
17.31
17.49
27.22
VS
ft
.".."---_.,----.."...,.,...,, '
-5215.16
-5219.11
-5213.98
-5203.55
-5188.04
-5168.04
-5138.04
-5114.75
-5081.12
-5051.82
-5019.77
-4986.25
-4952.25
-4921.65
-4890.71
8.89
6.92
7.74
-4854.35
-4823.99
-4792.55
(' (' iii..
ObP BP Amoco BAKDI.
IUCIIIS
Baker Hughes INTEQ Survey Report INT EQ
-- -----_..- -..------.------ -- n.. - --_. .-.- ---- -- -.----.- _. --- -.
Company: BP Amoco Date: 10/23/2001 Time: 10:47:02 Page: 2
- Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 15-41, True North
Site: PB DS 15 Vertical (fVD) Reference: 58: 41 7/22/199400:0066.2
Well: 15-41 Section (VS) Reference: Well (0.OON,O.00E.150.00Azi)
Wellpatb: 15-41B Survey Calculation Method: Minimum Curvature Db: Oracle
.. - ---... - -- .. -- - --. , - ._---.---- --...---------.----..---,----_u.----_..O..__n- -.---.----u_----------.--.---_u_____--_n___n_...__- --..------_._- ----_u- ---_on ---.- _n_" --
Survey
---,- ---' -..---..-----..-- ____un - --'-'- --------.-----------.--------------------.-----------.--u_------------..--,------ --------_'__m-_O-'---------'---'- .__u -- -. ---- -----_. - ~-_...
MD Incl Azim TVD SSTVD N/S EIW MapN MapE DLS VS
ft deg deg ft ft ft ft ft ft deg/10OO ft
- -.---.------------------.. ---.-----------. .__.___n______---'--------'---'--- ----..------.-..---- _h_.____--.-- --------------,--.--------------------.-,-----. ---,---.--'-'--'--. - .---.--------'------'--" -
11335.09 88.33 153.25 8752.07 8685.82 5109.25 -663.36 5965114.02 675865.99 3.29 -4756.42
11380.68 89.30 148.33 8753.01 8686.76 5069.48 -641.12 5965074.79 675889.15 11.00 -4710.86
11414.73 88.07 148.33 8753.79 8687.54 5040.51 -623.25 5965046.25 675907.70 3.61 -4676.83
11460.54 86.84 145.52 8755.83 8689.58 5002.17 -598.28 5965008.50 675933.56 6.69 -4631.14
11503.79 87.01 139.89 8758.15 8691.90 4967.82 -572.12 5964974.79 675960.52 13.00 -4588.32
11546.96 92.02 143.06 8758.51 8692.26 4934.07 -545.24 5964941.67 675988.18 13.73 -4545.65
11580.09 94.04 147.63 8756.76 8690.51 4906.86 -526.43 5964914.92 676007.62 15.06 -4512.68
11616.11 93.34 149.39 8754.44 8688.19 4876.21 -507.66 5964884.72 676027.11 5.25 -4476.75
11648.71 91.41 152.90 8753.09 8686.84 4847.69 -491.94 5964856.58 676043.49 12.28 -4444.1 9
11682.02 88.86 151.14 8753.01 8686.76 4818.28 -476.32 5964827.54 676059.80 9.30 -4410.91
11742.29 84.46 158.88 8756.53 8690.28 4763.80 -450.92 5964773.68 676086.47 14.75 -4351.03
11789.12 83.23 156.77 8761.55 8695.30 4720.69 -433.35 5964731.00 676105.05 5.19 -4304.91
11820.42 83.85 160.64 8765.07 8698.82 4691.71 -422.05 5964702.30 676117.02 12.44 -4274.17
11856.89 83.85 159.93 8768.98 8702.73 4657.58 -409.82 5964668.46 676130.05 1.94 -4238.49
11887.97 82.27 157.82 8772.74 8706.49 4628.80 -398.70 5964639.96 676141.84 8.44 -4208.01
11929.17 81.56 153.25 8778.53 8712.28 4591.68 -381.82 5964603.25 676159.60 11.12 -4167.42
11963.91 81.83 149.74 8783.55 8717.30 4561.48 -365.41 5964573.44 676176.70 10.03 -4133.07
11996.81 82.88 147.63 8787.93 8721.68 4533.63 -348.47 5964545.99 676194.30 7.11 -4100.47
12042.88 84.90 147.11 8792.83 8726.58 4495.05 -323.77 5964508.01 676219.90 4.53 -4054.71
12077.98 83.85 144.82 8796.27 8730.02 4466.11 -304.22 5964479.54 676240.12 7.15 -4019.87
12111.34 83.67 143.06 8799.90 8733.65 4439.30 -284.70 5964453.20 676260.26 5.27 -3986.89
12143.62 85.69 140.24 8802.89 8736.64 4414.10 -264.76 5964428.47 676280.79 10.72 -3955.1 0
12175.50 89.38 139.54 8804.26 8738.01 4389.74 -244.24 5964404.61 676301.87 11.78 -3923.75
12216.47 90.09 136.03 8804.45 8738.20 4359.40 -216.72 5964374.93 676330.10 8.74 -3883.71
12267.50 89.56 131.46 8804.61 8738.36 4324.13 -179.86 5964340.53 676367.77 9.02 -3834.74
12304.75 89.03 130.40 8805.07 8738.82 4299.73 -151.72 5964316.80 676396.47 3.18 -3799.53
12335.82 91.49 129.70 8804.93 8738.68 4279.74 -127.94 5964297.37 676420.71 8.23 -3770.33
12392.95 91.67 126.89 8803.35 8737.10 4244.35 -83.13 5964263.05 676466.35 4.93 -3717.28
12435.33 93.78 125.83 8801.34 8735.09 4219.25 -49.04 5964238.77 676501.01 5.57 -3678.50
12490.53 92.81 123.02 8798.16 8731.91 4188.10 -3.59 5964208.69 676547.18 5.38 -3628.80
12524.05 92.64 120.91 8796.57 8730.32 4170.38 24.82 5964191.64 676575.99 6.31 -3599.25
12561.70 92.02 119.85 8795.04 8728.79 4151.35 57.27 5964173.39 676608.88 3.26 -3566.54
12599.85 91.49 119.50 8793.87 8727.62 4132.48 90.40 5964155.30 676642.44 1.66 -3533.63
12652.16 87.89 117.74 8794.15 8727.90 4107.43 136.31 5964131.33 676688.93 7.66 -3488.98
12693.98 86.48 117.39 8796.21 8729.96 4088.10 173.34 5964112.88 676726.40 3.47 -3453.73
12724.93 87.01 116.69 8797.96 8731.71 4074.05 200.86 5964099.48 676754.24 2.83 -3427.80
12745.63 88.07 115.99 8798.85 8732.60 4064.87 219.39 5964090.75 676772.98 6.13 -3410.59
12777.00 88.07 115.99 8799.91 8733.66 4051.13 247.57 5964077.68 676801.48 0.00 -3384.60
.. _._--._m.__-___...n______,----.--' ,- "'---____-n_'-' n----'_u -_u_.---------"-----
6J
~
'1
;;¡
I-
W
C
I
I-
"
':J
¡¡j
;:
m
~
~
'f>
~
~
0
0
Cò
(:)
(:)
""
ceo
c.
'"
~
~
~
¡¡:
'"
(:)
0
:g
0
0
~
0
0
<'J
"
0
~
co
g Z
C 0
f=
"
:;:
" 0::
â 9
~
w
g :z'
c w
0::
CD
0 ~
g -
~
0
0
"
<t
0
(:)
CO
"
0 00
~ i~
0 ::J$
?: ~ê
0
ceo
;;
0
0
<'J
CD
0
CO
"
CD
0
0
CO
CD
0
0
0
0
0
0>
0
0
CD
0
;:::
0
0
'"
~
¡¡:
ai
0
(:)
CO
m
0
~
~
0
0
CO
0
0
<'J
0
0
0
0
0
0
0
'"i?'
....
(:)
0
'7
0
0
"
0
0
"7
0
0
"?
0
0
~
0
0
'?
0
0
'"
0
0
~
0
0
0
0
:::
0
0
CO
';'
0
0
"
0
0
40
';'
0
0
'"
';'
0
;:::
';'
0
0
::;
0
0
0
<t
f'
0
ceo
~
0
0
CD
CD
¿
«
"<t
;1:
0
....
0
0
N
(V)
N
0
0
0
¿¡
II')
?'
...
m
I:
e
;;
u
Gì
II:
'i
u
t:
(!
:>
0
40
CD
CD
0
(:)
0>
CD
..."'1\,
Vbp
f liP Exploration (Alaska), Jnc.
Baker Hughes INTEQ Survey Report
...
BA.KaR
IUGI8 S
--.. --. -.~--- --- -
IN rEQ
Compa.y: BP Amoco
FIeld: Prudhoe Bay
Site: PB OS 15
WeD: 15-41
Wellpatb: 15-41APB1
Date: 3/13/2001 TIme: 15:40:47 Page: 1
Co-ordlute(NE) Refereace: Well: 15-41, True North
Vertical (TVD) Refereace: 58: 417/22/1994 00:00 66.2
Sectlo. (VS) Refereace: Well (0.OOE.0.OON.61.00Azi)
S.rvey Calnl.doa Me~od: Minimum Curvature Db: Oracle
Field:
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Goo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2000
Site:
PB DS 15
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5958837.36 ft
676296.98 ft
Latitude: 70 17 35.236 N
Longitude: 148 34 21.213 W
North Reference: True
Grid Convergence: 1.34 deg
Slot Name:
41
Well: 15-41
15-41
Well Position: +N/-S 1176.23 ft Northing:
+E/-W 379.93 ft Eastlng:
Position Uncertainty: 0.00 ft
5960022.10 ft
676649.20 ft
Latitude:
Longitude:
70 17 46.805 N
148 34 10.139 W
Wellpath: 15-41APB1
500292249270
Current Datum: 58: 41 7/22/199400:00
Magnetic Data: 3/13/2001
Field Strength: 57484 nT
Vertical Section: Depth From (TVD)
ft
0.00
Height
66.25 ft
Drilled From:
TIe-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+EI-W
ft
0.00
+N/-S
ft
0.00
Survey:
MWD
Start Date:
Company: Baker Hughes INTEQ
Tool: MWD,MWD - Standard
Engineer:
TIed-to:
From: Definitive Path
Annotation
15-41
10810.00 ft
Mean Sea Level
26.79 deg
80.79 deg
Direction
deg
61.00
3/1/2001
MD
ft
10810.00
11818.00
TVD
ft
8641.67
8798.01
Kick-off Point
Projected to TD
Survey
MD Inel Azlm TVD SSTVD N/S EIW MapN MapE DLS VS
ft deg deg ft ft ft ft ft ft deg/100ft ft
10810.00 13.27 358.76 8641.67 8575.42 5456.68 -1018.31 5965452.99 675502.99 0.00 1754.82
10869.00 39.50 15.30 8694.12 8627.87 5482.02 -1013.41 5965478.44 675507.29 45.77 1771 .39
10899.00 49.00 24.10 8715.61 8649.36 5501.62 -1006.25 5965498.20 675513.99 37.65 1787.15
10935.00 56.60 18.80 8737.37 8671.12 5528.30 -995.84 5965525.11 675523.77 24.14 1809.19
10976.00 67.60 15.30 8756.53 8690.28 5562.89 -985.29 5965559.94 675533.51 27.86 1835.19
11002.00 72.80 20.60 8765.34 8699.09 5586.14 -977.74 5965583.36 675540.51 27.70 1853.07
11040.00 79.50 24.10 8774.43 8708.18 5620.23 -963.70 5965617.77 675553.74 19.77 1881 .87
11081.00 85.70 28.70 8779.71 8713.46 5656.62 -945.63 5965654.57 675570.95 18.77 1915.32
11118.00 87.90 33.30 8781.78 8715.53 5688.27 -926.61 5965686.66 675589.22 13.76 1947.30
11154.00 86.80 35.70 8783.44 8717.19 5717.91 -906.24 5965716.76 675608.88 7,33 1979.48
11183.00 84.60 38.90 8785.62 8719.37 5740.91 -888.72 5965740.17 675625.86 13.36 2005.96
11224.00 83.70 43.90 8789.80 8723.55 5771.49 -861.76 5965771.38 675652.09 12.33 2044.37
11287.00 81.10 48.00 8798.13 8731.88 5814.90 -816.89 5965815.83 675695.92 7.66 2104.65
11343.00 85.10 51.10 8804.86 8738.61 5850.96 -774.60 5965852.86 675737.35 9.01 2159.12
11372.00 88.50 54.00 8806.48 8740.23 5868.56 -751.61 5965870.99 675759.91 15.40 2187.76
11410.00 90.60 59.60 8806.78 8740.53 5889.35 -719.83 5965892.53 675791.20 15.74 2225.64
11451.00 91.00 63.80 8806.21 8739.96 5908.79 -683.75 5965912.80 675826.82 10.29 2266.62
11496.00 90.70 70.20 8805.54 8739.29 5926.36 -642.35 5965931.34 675867,78 14.24 2311.34
"to""--.I..
~ '"" lì, "ì
. .. ¡--
-Ii:. .. '
..."~.
{ (
liP Exploration (Alaska), Inc.
Baker Hughes INTEQ Survey Report
IIi.
BAK"
NUGMI S
'-"-"'-"'----""'_----"'-'-'.
INTEQ
Company: BP Amoco
Field: Prudhoe Bay
Site: PB OS 15
WeD: 15-41
Wellpatlt: 15-41APB1
Survey
Date: 3/13/2001 TIme: 15:40:47 Page: 2
OHJrdlaate(NE) Reference: Well: 15-41, True North
Vertical (TVD) Refereace: 58: 41 7/2211994 00:00 66.2
Sectloa (VS) Refereace: Well (0.ooE,0.00N,61.00Azi)
Sarvey Calc.lado. Metltod: Minimum Curvature Db: Oracle
MD I.d Azlm TVD SS TVD N/S E/W MapN MapE DLS VS
ft deg deg ft ft ft ft ft ft deg/1 OOft ft
11529.00 88.90 70.50 8805.65 8739.40 5937.45 -611.27 5965943.17 675898.59 5.53 2343.90
11563.00 90.10 74.00 8805.95 8739.70 594 7.82 -578.90 5965954.29 675930.71 10.88 2377.24
11594.00 90.50 76.80 8805.79 8739.54 5955.63 -548.90 5965962.80 675960.51 9.12 2407.27
11643.00 92.20 81.80 8804.63 8738.38 5964.72 -500.78 5965973.02 676008.40 10.77 2453.76
11710.00 92.40 88.79 8801.94 8735.69 5970.21 -434.11 5965980.08 676074.93 10.43 2514.74
11749.00 92.80 93.40 8800.17 8733.92 5969.47 -395.16 5965980.25 676113.87 11.85 2548.44
11788.00 91.40 95.80 8798.74 8732.49 5966.34 -356.32 5965978.04 676152.78 7.12 2580.90
11818.00 91.40 95.80 8798.01 8731.76 5963.31 -326.48 5965975.71 676182.68 0.00 2605.52
DETAILS
Azimuths to True North l w~""'" (15-4111541APB1)
Magnetic North: 26.79' .:=."".d By.~ Pot", Os. 311312001
Magnetic Fieid
Strength: 57484nT
Díß~~g~1t'g8;
Model: BGGM2000
Co-ordinate (N/E) Reference Well Centre 1541, True North
Vertlcai (TVD) Reference System: Mean Sea Levai
Seclion (VS) Reference: Siot - 41 (Om,O,OO)
Measured Depth Reference. 58: 41712211994 00:00 66.2
Calcuiatlon Method: Minimum Curvature
Slol.41 (0.00,0,00)
61.00'
Rig: CDR 1
Deplh Reference: 58: 41 712211994 00:00
66,2511
REFERENCE INFORMATiON
ANNOTATIONS
No
TVO
MO Amolabo,
8575.42 1081000
873176 1181800
L__-
1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1800 1950 2000 2050 2100 2150 2200 2250 2300 2350 24D0 2450 2500 2550 2800 2650 2700 2750 2800 2850 2900 2950 3000 3050 3100 3150 3200 3250 3300 3350
Vertical Section at 61.00'
3/13/2001
3:52 PM
~'
(
~lJ&\lTŒ (ID~ ~~~~~~
ALAS KA 0 IL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. ]TH AVENUE. SUITE 100
ANCHORAGE. ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907)27~7542
John Cub bon
CT Drilling Engineer
BP Exploration (Alaska) Inc.
POBox 196612
Anchorage AK 99519-6612
Re:
Prudhoe Bay Unit 15-41B
BP Exploration (Alaska) Inc.
Permit No: 201-146
Sur Loc: 1474' SNL, 4566' PEL, SEC. 22,T11N, RI4E, UM
Btmhole Loc. 2596' NSL, 4376' WEL, SEC. 15, TIIN, RI4E, UM
Dear Mr. Cubbon:
Enclosed is the approved application for permit to drill the above referenced well.
The pelmit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Annular disposal has not been requested as part of the Permit to Drill application for Prudhoe
Bay Unit 15-41B.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
~L{,ct, .11 / Þk<-~,<rXf
Julie M. Heusser
Commissioner
BY ORDER OF TH~,)COMMISSION
DA TED this î - day of August, 2001
jjc/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o enc!.
Department of Environmental Conservation w/o enc!.
(' STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 MC 25.005
t: ' '
J)~ÇQ
/J P/'G
1 a. Type of work 0 Drill II Redrill 1b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
0 Re-Entry 0 Deepen 0 Service 0 Development Gas ia"s~~le Zone 0 Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 66.25' Prudhoe Bay Field I Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028306
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1474' SNL, 4566' FEL, SEC.22, T11N, R14E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
3919' NSL, 297' WEL, SEC. 16, T11N, R14E, UM 15-41B Number 2S1 00302630-277
At total depth 9. Approximate spud date
2596' NSL, 4376' WEL, SEC. 15, T11 N, R14E, UM 09/01/01 Amount $200,000.00
12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028303, 2683' MD No Close Approach 2560 12779' MD I 8690' TVDss
16. To be completed for deviated wells 0 17. Anticipated pressure {see 20 MC 25.035 (e) (2)}
Kick Off Depth 10710' MD Maximum Hole Angle 90 Maximum surface 2236 psig, At total depth (TVD) 8800' / 3300 psig
18. Casing Program Specifications Setting Depth ("\1 of (:gmgnt
(~i'Ze TCID ....
Hole (' Weiaht Grade f"".nllnlina Lenath MD TVD MQ. ITVD linclude staae data)
3" 2-3/8" 4.7# L-80 ST-L 2539' 10240' 8015' 12779' 8690' 54 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 11818 feet Plugs (measured) Top of 2" CT (filled w/ cement) at 10750' (03/01)
true vertical 8798 feet
Effective depth: measured 10750 feet Junk (measured) Top of milllmotor BHA at 11605'; 2" CT f/1 0750' to 11380'
true vertical 8583 feet w/ cement; Cement f/11500' - 11380'
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" 260 sx Arcticset (Approx.) 110' 110'
Surface 3925' 9-5/8" 944 sx PF 'E', 375 sx PF 'C' 3964' 3558'
Intermediate 1 0372' 7" 307 sx Class 'G' 1 04381 8276'
Production
Liner 880' 5" 112 sx Class 'G' 10270' - 10810' 8111' - 8642"
RECEIVED
Perforation depth: measured Open Hole wI Fish: 10814' - 118181 JUL 1 7 2001
true vertical Open Hole wI Fish: 8646' - 8798'
^ 1-:1t:""-'-' nil R. r..~~ Cdns. Commission
20. Attachments II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch AJ~rogram
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 020 AAC 25.050 Requirements
Contact Engineer Name/Number: JohnJtiul)~on¡¡ ~-4158 ot' N\~('~ ~1\:5CtO, 5'(..4-Sc."" Prepared By Name/Number: Terrie Hubble, 564-4628
21, I hereby certify that t~ rz:¡rg i ~ ; and correct to the best of my knowledge 7/kbø/
Signed John Cubbon I All 'j ~~ Title CT Drilling Engineer Date
'"",,"
II Commission Use '.Onl\ f .
Permit Number vi.. V API Number APr.Y9} Date See cover letter
:L r') 1- /. ~'-" 50. 029-22492-02 - '.01 for other reQuirements
Conditions of Approval: Samples Required D. Yes -§ No Mud Log Required DYes aNo
Hydrogen Sulfide Measures ~ Yes No Directional Survey Required ~ Yes D No
Required Working Pressure for BOPE D 2K 0 3K D 4K D 5K D 10K D 15K ~3.5K psi for CTU
Other:
ORIGINAL SIGNED IV by order of Date o~/o 7/0 f
Approved Bv . I.JI .. -- . ~ Commissioner the commission
Form 10-401 Rev. 12-01-85 -. 'w' U K f LJ ! !\f l~ f SJbmit hi Triplicate
\ --..
(
(
BPX
15-41 B Sidetrack
Summary of Operations:
A CTD sidetrack of well 15-41 B will be drilled. Specific prep work, (Phase 1) and drilling, (Phase 2)
operations are detailed below.
Phase 1: Isolate & integrity test inner annulus, (IA). Drift tubing and tag PBTD in liner. Set a cement
plug for kickoff. Mill window with service coil, if available.
Planned for August 15, 2001
. Drift well and tag as deep as possible with slickline.
. Liquid pack and integrity test the IA.
. Spot a cement plug from PBTD to approximately 100 feet above the kickoff point, which will be at
approximately 10,710' MD (8,478' TVDss).
. Mill window with service coil if available.
Phase 2: Drill and Complete CTD sidetrack: Planned for September 1, 2001
2" coil will be used to drill a -2,000 foot, 3" open hole sidetrack, (as per attached plan) and run a solid,
cemented & perforated 2-3/8" liner completion.
Mud Program:
. Phase 1: Seawater
. Phase 2: Seawater and Flo-Pro (8.6 - 8.7 ppg)
Disposal:
. No annular injection on this well.
. All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
. All Class I wastes will go to Pad 3 for disposal.
Casing Program:
. 2-3/8", l-80, solid liner will be run from 10,240'md (TOl, 8015' TVDss) to TD at approximately
12,780'md. Liner will be cemented to approximately 160' above the window with approximately 11 bbls
(annular volume plus 25% excess in OH) of 15.8 ppg class G cement.
Well Control:
. BOP diagram is attached.
. Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3,500 psi.
. The annular preventer will be tested to 400 psi and 2,200 psi.
Directional
. See attached directional plan.
. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
. An MWD Gamma Ray log will be run over the open hole section.
. A memory CNl will be run inside the liner.
Hazards
. A recent H2S concentration for 15-41 is not available. However, there are currently no wells on Pad 15
that are producing with H2S concentrations in excess of 100 ppm.
. The well path will cross one mapped fault. This fault, with an estimated 20 feet of throw, is not expected
to cause severe fluid losses.
("
(
Reservoir Pressure
Reservoir pressure is estimated to be 3,300 psi at 8,800ss. Maximum surface pressure with gas (0.12
psi/tt) to surface is 2,236 psi.
(
lREE = 4-1115' ON 51<
WELL H EÄ D= Frvc
AClUA TOR= BA KER C
KB. B..EV = 66'
BF. B..EV = -_ ?
KOP= 1450'
Max An e= 53 7281'
Ostum rvÐ =
Ostum lVD= 8800' SS
10-3/4" CSG, 45.5#. L-80, 10 = 9.953"
39'
9-5/8" CSG, 47#, L-80, 10 = 8.681"
3964'
3-1/2" TBG, 9.2#, FOX 13CRSO, 10 = 2.992"
1 0148'
Minimum 10 = 2.750"@ 10267'
3-1/2" PARKER SWN NIPPLE
I 7" X 5" TIW LNRlI-f\JGRlPKR (-I
10270' I
3-1/2" TBG, 9.2#, L-80, .0087 bpf, 10 = 2.992"
10281'
7' COO, 26#, L-80, 10 = 6.276"
10438'
PERFORATION SUIvIv1ARY
REF LOG: SWS GRlCCL 11-11-94
ANGLEA TTOP PERF:
f\bte: Refer to Production DB for historical perf data
SIZE SPF INTER\! AL Opn/Sqz DATE
NO PERFS
(
15-41A
SAFETY NOTES: OOILEDTBG ASH IN WELL (SIDETRACK
SECfION). 3.5" Ut\lQLE OVERSI-OTWAS SPACED OUT TO
SWALLOWTBG STUB@10,170'. ŒPlH [)SmEPANCY DUE
TO [)FFERENCE BETWEEN E-Llf\E & RIG MEÄSURBv1ENTS.
5" LNR, 15#, 13m-SO, .0196 bpf, D = 4.408"
11150'
STA
1
2
3
4
GAS LFT MA.t'ÐRELS
MD TVD DEV TYPE MAN
3577 3237 48 CA-FM-IO
6745 5322 53 CA-FM-IO
9125' 6965 31 CA-FM-IO
10008' 7787 8 CA-FM-IO
LA TCH
~
~
~
~
10080'
10102'
10127'
10170'
10156'
10207'
10210'
10214'
10245'
10267'
10281'
10750' CTM
3-1/2" I-ES X t\lP, 10 = 2.813"
3-1/2"I-ESX t-IP,ID =2.813"
CI-EMCALL Y cur lEG - 12/23/00
3-1/2" UNlQLE OV ERSI-OT, 10 = 3.625"
3-1/2" X 4-1/2" XO
7" X 4-1/2" BAKER SABL-3 PKR, 10= 3.875"
4-1/2"X 3-1/2" XO
3-1/2" OTIS X NIP, 10 = 2.813"
3-1/2" PARKERSWN NIP, 10= 2.75"
3-1/2" lUBING TAIL WLffi
B..MTT DA.lE NOT AVAILABLE
2" OOIL TBG, TOP OF FISH,
3RD CI-EM CUT (SUCCESSFLL)
MILLED WINDOW IN 5" LNR
TOP @ 10,810'
BTM @ 10,814'
DA. lE REV BY COM~NTS DATE REV BY COM~NTS
11/12/94 ORIGINAL OOMA.ETION 03/05/01 ABORlED SIDETRA CK
08/09/94 WORKOVER OS/24/01 CI-VTP OORRECfIONS
12/04/00 SIS-isl 00 NV ERfED TO CANVAS
01/13/01 LAST WORKOVER
01/19/01 SIS-MD FNAL
10925'
DEPTH OF 2ND CI-EM cur
(DID NOT FREE PPE)
11150'
DEPTH OF 1 ST CI-EM cur
(DD NOT FREE APE)
11380'
11687'
BTM OF FISH
(BHA #1)
END OF ASH - BHA.
TOP OF ASH - BHA.
(51' LONG)
11738'
PRLDI-OEBAY LNIT
WELL: 15-41A
PERMIT f\b: 94-094
AA No: 50-029-22492-00
Sec. 16 T11N R14E 299.39 FB.. 1205.99 FN...
BP Exploration (Alas ka)
('
(
TREE = 4-1/16" eM' 5K
waLHEAD= FMC
ÀC1UÅTöR~ . , BAKÈR C
, ., - ,.. ' . ""..
KB. REV = 66'
.-... ... ."'" ....
~F..~_ey_.~-_.., -_-.'Oh'. .-..7.
KOP= _?
. .... ...- .' -0, , ,
.~~ng,!-~_._..... -'--'--
Datum t..I) =
.------........-...-,
Datum lVD=
15-418
PROPOSED CTD SIDETRACK
SAFETY NOTES: COLED iBG FISH N WB.l (SÐETRAO<
SECTK:>N). 3.5. lXIIlQUE OVERSHOT WAS SPAC8) OUT TO
SWALLOWTBG STUB @10,170'. DEPTH DISCREPANCY DUE
TO DFFERENCE BETWæ-J E-LNE & RIG MEAS~.
un .......-. -.... .0..
8S00' SS
10-314. CSG, 45.5#, L-SO, D = 9.953"
39'
9-518. CSG, 47#. L-80. D = 8.681.
3964'
3-112. iBG, 9.2#, FOX 13CR80, D = 2.992.
?
Minimum 10 = 2.750"@ 10267'
3-1/2" PARKER SWN NIPPLE
TOP OF 5. LNR
10259'
3-1/2. TBG, 9.2#, L-80, .00S7 bpf. ID = 2.992"
10281'
7" CSG, 26#, L-SO, D = 6.276" I
10438'
ÆRFORA TION SUMMARY
REF LOG: SWS GRlCCl 11-11-94
ANGLEATTOPÆRF: 17 @ 10957
Note: Refer to Production DB for historical perf data
SIZE SPF MERV AL Opn/Sqz DATE
2" CT Fish f/10750' - 11380' (cemented)
P&A'd w/17 ppg Cement TOC 10757'
5" LNR, 15#, 13m-80. .0196 bpf, D = 4.40S"
11150'
GA S L FT M\ NDR8.. S
STA M) lVD DEV TYÆMAN LATa-t
1 3577' CA - FM-iO RK
2 6746' CA - FM-fO RK
3 9125' CA - FMHO RK
4 10008' CA - FMHO RK
10080'
10102'
1012T
10170'
10156'
1020T
10210'
10214'
10240'
10245'
10267'
10281'
3-112. HES'~ Nm.E. 0 = 2.813"
3-1/2. HES'~ NIPPLE. 0 = 2.S13"
a-EMCALL Y CUT TBG - 12123/00
3-112. UN1QUEOVERSHOT, [) = 3.625"
DATE REV BY COMMENTS DATE REV BY COMMefrS
11/12194 ORJGNAL COMPLETION 03/05/01 A BORTEÐ S DETRA CK
08109/94 WORKovm 04/18/01 Ct-VTP CORRECOONS
12104/00 SIS-isl CONVERTED TO CAtoN AS 04124/01 per Proposed ST 15-41B
01/13/01 LAST WORKOVER
01/19/01 S IS- tvf) FNAL
3-112. X 4-112. XO
r X 4-1/2" BAKERSABL-3 PACKER
4-112. X 3-1/2. XO
3-112. OTIS X Nm.e. D = 2.813"
3-1/2" PARKER SWN NIPPLE. () = 2.75.
3-1/2" WBING TAL WLEG
10550'
Cerrent Top
I 10710' H Cerrent Rarrp KOP (TOW)
",-",-:,.,,1t't1:~""f'
".<1,.. '.
j
. ""'.. 0.....- 0,
2-3/S. L-80 LNER. Cerrented & Perforated
12780'
MILLED WINDOW IN 5" LNR
TOW @ 10,810'
15-41A TDin OH
Mill! Motor BHA Fish
PRUDHOE BAY UNIT
WRL: 15-41B Proposed ST
PERMIT No: 94-094
API No: 50-029-22492-00
Sec. 16 T11N R14E 299.39 Fa. 1205.99 FNL
BP exploration (Alaska)
(
(
ObP
BP Amoco
Baker Hughes INTEQ Planning Report
IB il8
IJAKD.
HUGHlS
-----.--.---.--.-----
lNTEQ
-- - - ------.- ----- ---------.----.---- ...~._-- ~- --------- -----------.------- ----- -~-------'- --.-- --.---- - -----------~-_.-_._---.-.---'----~---'-------'- ---
Company: BP Amoco Date: 7/10/2001 Time: 17:09:14
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 15-41, True North
Site: PB DS 15 Vertical (fVD) Reference: System: Mean Sea Level
Well: 15-41 Section (VS) Reference: Well (0.00N,O.00E.150.00Azi)
Lc:-~~I!~~~~c:-~~;,=~2_~~~~c-cc=:o_c:=::~-cc:=' "-:::'="':cC'.-'c::'."=='::C=:C -,-==~=-c.-::""- == ,._==:::~~~~~..~-~~~:~~~-~~~:~~~~~,,= .:..=._~~~~~:~=~:~~~~~~cc:o":,, -ceo: --C'C . D ~ : .:~~~:~-~;:::.===_.J
Page:
1
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska. Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: BGGM2001 I
------------------------------------- -- -.----- _.._-_._-~._--- ----.---.-------.--.--- --------~-----------,-------'--'" -..... ----_.-- ._----_..--_J
Field:
----.. _u,-,-------,-",--.---.-.-------------- -.- --.-----.-.--.-- ----.---.- ---_._-----_._---------~_. --.-. --.u_---..-.- --------_. ---------- --..-.---.--- .-.---- -.-.-,
PB DS 15
TR-11-14
UNITED STATES: North Slope
; Site Position: Northing: 5958837.36 ft Latitude: 70 17
i From: Map Easting: 676296.98 ft Longitude: 148 34
Position Uncertainty: 0.00 ft North Reference:
1- ~~~un~.!-~~el: --------.--- ---~'~~-_f!.._-------_._--------~_._---~_.- Gri~_~_onver_~nc~.:..___-----
Site:
35.236 N
21.213 W
True
1.34 deg
-----. -.-.- -- --~.__._----_._- -- '--'--- ---'- - -----------~------
---_._----~---- -- ._-- --.----- -------
Well: 15-41
15-41
Well Position: +N/-S 1176.23 ft Northing:
+E/-W 379.93 ft Easting:
Position Uncertainty: 0.00 ft
Slot Name:
41
5960022.10 ft
676649.20 ft
Latitude:
Longitude:
70 17 46.805 N
148 34 10.139 W
----.-------.-----.-.--- ..- -,------'---u-'-- -- -----. --.- - -----'-' ..--- - ------------
----.--------------.-------
.--.------------..---.--. ...--
--------- ---'--- ----.-. ------.---..-.--.---.-----.-.. --.--.---.-.- .---..--..------ ~_.__.-._---_.._--_. --..-----.----- -- ----.._----_..~---'-'--"----
Wellpath: Plan#2 15-41 B Drilled From: 15-41
500292249202 Tie-on Depth: 10710.00 ft
Current Datum: 58: 41 7/22/199400:00 Height 66.25 ft Above System Datum: Mean Sea Level
Magnetic Data: 7/10/2001 Declination: 26.69 deg
Field Strength: 57500 nT Mag Dip Angle: 80.80 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
[= -~-~=~=~~~~~:_:~.~~-~~~-=~§~?~- ~= _._'.~_:_~~~~_.~-~~ u_---~:_:- _._~~ ~O~:_--: -~--~~-~~--~~ --~-~-O'. ~~_:_---~:_~=.~~.~~ ~~O~-:~~--~==~~~~~~:=-=- .=~~=---=-=-~~:_~~=-=:.
l:~~~~:~J~~t~~~~:~:: ~~~ =~= ~~==J~i~t~~~==~::~~e:~~th=~~~~~~=--- ~~
Targets
,-....- ... .-. --...-.. ,-......"'" - ......... --..--.. -........ " ..... -'- "-"""'" _......_.._.. ... .......' -...., -.- ..... ..._- -...- -.,..-. - -.. - -- ..-. ..._..._..~-_...._. _.-..---.. ...... '-. ....".......-...--..-.--.-......--. -........-. .__.,,----~.._..__._- -.-..--...--- _..__.._-_._-_..._-_._---~_.._---_.._~.~----,
- - -- - - - - - - --
Map Map <---Lati,tude ---> ,<-'--. Longitude ---> '
I Name DescriptionTVD +N/-S -- +E/-WNorthing Easting Deg Min Sec DegMiri See: '
1_- ft _oft -- ft- ft ft- ,
I - - - - - - -, -- - - - -
~:: ~:::~ :~::~:::~::: - :::::~:::: :~::;:.: -:: :: :~::~: ~: : :::::":-~
L- ~~_T~ @ ~ - --- - --- ~:. O~_~B3. 52_- ~4~~~ ~~:::~~ 6 7~~~"'-: ...:~ _::~:- -~~~.-::....
Annotation
í"" -.-..-.--..., ....,-c' -_.,:--_....~,;~..., .-----. '-"'.---"', ..._._...-.-...._.__..._-_.~.._......._- ~-_... .'-" ....- ....... h___- ......-- ':., ""'~:" ..--.-.--------.--
, l\iD TVD
! ,.......-.-.-.:ft -,_._..,:_-,._--:_.._..----,_._~_.......__c-----..----:--.__....._------_....-'-_~_--n______--_....--.................._._"...._.."""---"'-...;"',_C.....---..C...-."....-...-----...----:............-.....-,--"""'--..-..........-.....-"-""'" C....-.-.-..-..-..-..:...-...-..........-.--..
10616.83 8386.34 TIP
10710.00 8477.78 KOP
11035.00 8690.09 1
11178.66 8689.76 2
11528.66 8689.76 3
12278.66 8689.76 4
12778.66 8689.76 TD
'--~-"-"""._'--'-- -.. -,..--...-... -...--.--.--.........,-.--.....- ,....--.-..-.- --....--......"..-.-..--......-- -""'---'---'" ..__....~
.. . ..." ,
. . ",
"'--""-"'-""-'-'."-..-----...--..........--'--"-"-----""-------""-...----....-,.".."..-
-----,.._,- -~------'_."'-------'."-'--'-----"-"'-'_.._-----'------------..._._'__n____..--------..-"-----"--'----'--"'--------- _.._-,-".. _._,,---- -----... .--.-..- .....-----------.----------------------------------.
Plan Section Information
!' MD loel
I.___....-.-...!t......,--...-.....--.- ~~-~~...__..._....
10616.83 10.46
10710.00 11.66
11035.00 90.26
11178.66 90.00
L2_2~~8~~~--____9~~_~_~ __---_--_n___--------'---.--"-.-------------.----- --.,
Azim TVD
deg ft
-.. -""'."".".."-"""""-"-""""-'-..-----."'-"""-----
0.15 8386.34
0.33 8477.78
128.95 8690.09
143.32 8689.76
178.32 8689.76
+N/-S+E/;'W DLS Build Turn TFO Targe¡--'-~-~---:l
'...- ......~-c._--" .--- -, ".-. ._-~... -.-.. ..- ._, -~-~~~ ~~9.~.. .~.~~! ~.~~-~, .?_~.~(!99!t.._._...- .~:~.- ... .-.... '-"'-.' .-._-- .-- .., ,.. ".......' ..- ...-........,. ..,..., -.--. - -.--.-- --_. --. ..J
5417.25 -1018.22 0.00 0.00 0.00 0.00
5435.13 -1018.14 1.29 1.29 0.19 1.74
5342.23 -848.53 30.00 24.18 39.58 128.00
5238.93 -749.25 10.00 -0.18 10.00 91.00
4913.48 -636.01 10.00 0.00 10.00 90.00
- ...-----.___--M..___.----..-----.----... "'n__--_._- ---- -------, ---..-------n-.--.--.
ObP
""-- "~" ".. "",,- -"."
, "".....
('
(
BP Amoco
Baker Hughes INTEQ Planning Report
- ---..
,,-
"_.,,
".. -'.-..-.."..-".
..
. ... """""- .-.. ."..
..
Riï8
BAIŒR
HUGtIIS
'----'--'--
lNTEQ
-
Company: BP Amoco Date: 7/10/2001 Time: 17:09:14 Page: 2
: Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 15-41, True North '
Site: PB DS 15 Vertical (fVD) Reference: System: Mean Sea Level .
j Well: 15-41 Section (VS) Reference: Well (0.00N,O.00E,150.00Azi) :
l"..~~.~I!.~!~..:- ""'. ~.I~,,~~_~~,,~~._- . "". --........".."---.---........."".."."."...".".-.,, "'-u""'-"'-""" "."....__._._..""_.~~~~~,,,,~~~~~~.~t~~.~.~~!~~~,,:_._.__.~i~!~~~.."~.~~~~~~.....".._-_._-_.~~.=""..,, O~9~~"....".._,,--1
Plan Section Information
-u"---'--- .. "'--"--------"------------""'------"--"--"-"--"---'--'-----"---,
I MD Incl Azim TVD +N/-S +EI-W DLS Build Turn TFO Target :
l_- ...on- --- "'~'" ,,- - _.. -.... -"", """ ~:~" ,,--,,-, ", "" ..._..~ ~..~-- ", "-",,, ",- --..""" _... """""" ._~..._.- - - , "" ----",,- m.. ~......_.._.. "",- """'-~ _..._m."" "" """ ~.~~~?~. - ~..: ~ ..~~ ~'" ,,~,:~!- ~.~.~. "-,, - "-,, ~-~~..- -""-"'" "'" .....- -'" -"" -'" "'--' -""""" -. ",--""" "-"'" """ ", ---""'" "", -",.. j
.. 12278.66 90.00 103.32 8689.76 4372.77 -195.26 10.00 0.00 -10.00 270.00 :
12778.66 90.00 153.32 8689.76 4072.52 184.71 10.00 0.00 10.00 90.00 '
-"---.-.--..--.----------...-.. "-"-'---""---"----"""-'-"""- .- "----'" ----..---- -----"---------'--"""-"-----"'----"---"--'----"""--'---- --"" -- ---""""....!
Survey
. - ---- - - '-' --,,--,---- - ---" . .-. ---- .._-.- -. _... --..- .... -. ""--. --"- -" -... ___"m- - ---.--.-... -.----"
..__..
..
Tool -I
MD Incl Azim SSTVD N/S EIW MapN MapE DLS VS TFO
ft deg deg ft ft ft ft ft deg/100ft ft deg
..... ""'-""'-"'-"'--'- """-'---"'......--...... ....-- '--"--"-----,--"-,,-,-,,-,,,,,,,-, ...... -'--'-""-' -..-...--.-....-.. -.....--........-........... "--...........- ..... .............-.....-.....-......-..... -.........-..-.. _..m___. ....-.-.-,,-.....-... ... .......... - ....-. -.--.. .....""" """ --......... . ...
10616.83 10.46 0.15 8386.34 5417.25 -1018.22 5965413.58 675504.01 0.00 -5200.59 0.00 TIP
10625.00 10.57 0.17 8394.37 5418.74 -1018.22 5965415.07 675503.98 1.29 -5201.87 1.74 MWD
10650.00 10.89 0.22 8418.94 5423.39 -1018.20 5965419.72 675503.88 1.29 -5205.90 1.72 MWD
10675.00 11.21 0.27 8443.47 5428.18 -1018.18 5965424.51 675503.79 1.29 -5210.04 1.67 MWD
10700.00 11.53 0.31 8467.98 5433.11 -1018.15 5965429.44 675503.70 1.29 -5214.29 1.62 MWD
10710.00
10725.00
10750.00
10775.00
10800.00
10825.00
10850.00
10875.00
10900.00
10925.00
10950.00
10975.00
11000.00
11025.00
11035.00
11050.00
11075.00
11100.00
11125.00
11150.00
11175.00
11178.66
11200.00
11225.00
11250.00
11275.00
11300.00
11325.00
11350.00
11375.00
11400.00
11425.00
11450.00
11475.00
11500.00
11525.00
11528.66
11550.00
11575.00
11600.00
11625.00
11650.00
11.66
9.56
10.32
15.26
21.70
28.65
35.80
43.06
50.38
57.73
65.10
72.49
79.89
87.29
90.26
90.23
90.19
90.15
90.10
90.06
90.01
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
0.33
22.18
66.51
92.67
105.00
111.73
115.99
118.97
121.24
123.06
124.62
125.99
127.26
128.47
128.95
130.45
132.95
135.45
137.95
140.45
142.95
143.32
145.45
147.95
150.45
152.95
155.45
157.95
160.45
162.95
165.45
167.95
170.45
172.95
175.45
177.95
178.32
176.19
173.69
171.19
168.69
166.19
8477.78
8492.53
8517.19
8541.58
8565.29
8587.90
8609.04
8628.34
8645.47
8660.14
8672.09
8681.13
8687.09
8689.88
8690.09
8690.03
8689.93
8689.86
8689.81
8689.77
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
5435.13
5437.80
5440.62
5441.36
5440.01
5436.59
5431.16
5423.81
5414.67
5403.90
5391.67
5378.20
5363.73
5348.49
5342.23
5332.65
5316.02
5298.59
5280.40
5261.48
5241.86
5238.93
5221.58
5200.69
5179.21
5157.20
5134.70
5111.74
5088.37
5064.63
5040.58
5016.25
4991.70
4966.96
4942.09
4917.13
4913.48
4892.17
4867.27
4842.48
4817.87
4793.47
-1018.14
-1017.66
-1014.82
-1009.47
-1001.71
-991.66
-979.51
-965.45
-949.73
-932.61
-914.40
-895.39
-875.93
-856.33
-848.53
-836.99
-818.32
-800.40
-783.26
-766.92
-751.43
-749.25
-736.82
-723.10
-710.30
-698.45
-687.57
-677.69
-668.81
-660.97
-654.16
-648.41
-643.73
-640.12
-637.60
-636.16
-636.01
-634.99
-632.78
-629.49
-625.12
-619.68
5965431.45
5965434.13
5965437.02
5965437.88
5965436.71
5965433.53
5965428.39
5965421.37
5965412.61
5965402.24
5965390.45
5965377.43
5965363.41
5965348.64
5965342.57
5965333.26
5965317.08
5965300.08
5965282.29
5965263.76
5965244.51
5965241.64
5965224.59
5965204.02
5965182.86
5965161.13
5965138.89
5965116.17
5965093.02
5965069.48
5965045.59
5965021.40
5964996.97
5964972.32
5964947.52
5964922.61
5964918.96
5964897.68
5964872.84
5964848.14
5964823.64
5964799.38
675503.67
675504.08
675506.86
675512.19
675519.98
675530.10
675542.38
675556.61
675572.54
675589.90
675608.40
675627.71
675647.51
675667.46
675675.40
675687.16
675706.21
675724.54
675742.10
675758.88
675774.83
675777.08
675789.91
675804.11
675817.41
675829.78
675841.18
675851.60
675861.02
675869.43
675876.79
675883.11
675888.37
675892.56
675895.67
675897.69
675897.93
675899.45
675902.24
675906.11
675911.06
675917.07
1.28
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.03
10.00
10.00
10.00
10.00
10.00
10.02
10.02
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-5216.03
-5218.10
-5219.12
-5217.09
-5212.04
-5204.05
-5193.27
-5179.88
-5164.10
-5146.22
-5126.52
-5105.36
-5083.09
-5060.09
-5050.77
-5036.70
-5012.97
-4988.92
-4964.59
-4940.03
-4915.30
-4911.67
-4890.43
-4865.48
-4840.48
-4815.50
-4790.56
-4765.74
-4741.06
-4716.58
-4692.35
-4668.41
-4644.80
-4621.57
-4598.77
-4576.44
-4573.20
-4554.23
-4531.57
-4508.46
-4484.96
-4461.11
1.55 KOP
128.00 MWD
106.51 MWD
62.78 MWD
37.22 MWD
25.51 MWD
19.40 MWD
15.80 MWD
13.49 MWD
11.93 MWD
10.86 MWD
10.11 MWD
9.61 MWD
9.31 MWD
9.12 1
91.00 MWD
91.01 MWD
91.02 MWD
91.02 MWD
91.03 MWD
91.10 MWD
91.11 2
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 3
270.00 MWD
270.00 MWD
270.00 MWD
.. --""--'--"'--'--"---"""----"."...----..-....,,--............. """ "'...' ...-. "---"""""""---"""'-----"""-'--""""'-"'-'",-" ---"'-""""""""""""-'------'-""----"-'---'-'-----------__.__n___......--
270.00 MWD
270.00 MWD
ObP
c---..-------------------
(
f
'.
BP Amoco
Baker Hughes INTEQ Planning Report
Bíl8
BAKDt
IIUGMIS
-------------------
INT EQ
- ------------------------------------------- ----- -- -- --_--_m---- ..----- ---------------- - --------------------- --- ---- ---- ---- ---- ----------------------- -------
, Company: BP Amoco Date: 7/10/2001 Time: 17:09:14 Page: 3
i Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 15-41, True North :
: Site: PB DS 15 Vertical (TVD) Reference: System: Mean Sea Level ,
---- Well: 15-41 Section (VS) Reference: Well (0.00N,0.00E,150.00Azi)
i~_~!~ I!'.~ t h ~------'=! ~~~--~~:!~ ~- -- -- --------- ------- ._-- -m_. - -- - -- ----- ,----- --- --..-- -- - ------- h ------ -- - -- ~~~~!_-~--~~~~~~!~~~...~-~! ~~-~ ~-------~~-~~~-~ - ~~-~t_~~~----------- _.._-~~:_---~ ~~~~ ~---______I
Survey
-------------------------- ------------------------------~
I MD Incl Azim SSTVD N/S EIW MapN MapE DLS VS TFO Tool!
¡ ft deg deg ft ft ft ft ft deg/10OO ft deg i
I,.. - --- - - ---- --------- ---- -- - -- - --------------- - --- -- -- - - - ----- - ---- --- - - ------ ---- - - - -- ---- --- ----- - - - - - -- --- -- ---- ----- -- -- ---- ------ ---- ----------- - - - - - -- ----- -- ------- -- -------- -- ------ --- --- --- -------'" ---------- - -- -- -- -- -- --_m_- ------- - -------- ---------- ---- ------- -..-- ------ -- -- ----- ----- --" - -- -- -- -.. J
11675.00 90.00 163.69 8689.76 4769.33 -613.19 5964775.40 675924.13 10.00 -4436.96 270.00 MWD
11700.00 90.00 161.19 8689.76 4745.50 -605.64 5964751.75 675932.23 10.00 -4412.55 270.00 MWD
:
I 11725.00 90.00 158.69 8689.76 4722.02 -597.07 5964728.48 675941.36 10.00 -4387.92 270.00 MWD I
11750.00
11775.00
11800.00
11825.00
11850.00
11875.00
11900.00
11925.00
11950.00
11975.00
12000.00
12025.00
12050.00
12075.00
12100.00
12125.00
12150.00
12175.00
12200.00
12225.00
12250.00
12275.00
12278.66
12300.00
12325.00
12350.00
12375.00
12400.00
12425.00
12450.00
12475.00
12500.00
12525.00
12550.00
12575.00
12600.00
12625.00
12650.00
12675.00
12700.00
12725.00
12750.00
12775.00
12778.66
--- ---~------
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
156.19
153.69
151.19
148.69
146.19
143.69
141.19
138.69
136.19
133.69
131.19
128.69
126.19
123.69
121.19
118.69
116.19
113.69
111.19
108.69
106.19
103.69
103.32
105.45
107.95
110.45
112.95
115.45
117.95
120.45
122.95
125.45
127.95
130.45
132.95
135.45
137.95
140.45
142.95
145.45
147.95
150.45
152.95
153.32
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
8689.76
4698.94
4676.29
4654.13
4632.50
4611.43
4590.97
4571.15
4552.02
4533.61
4515.95
4499.08
4483.04
4467.84
4453.53
4440.12
4427.64
4416.12
4405.59
4396.04
4387.52
4380.03
4373.59
4372.77
4367.47
4360.28
4352.06
4342.82
4332.57
4321.33
4309.14
4296.00
4281.95
4267.01
4251.20
4234.57
4217.15
4198.95
4180.03
4160.41
4140.13
4119.24
4097.76
4075.75
4072.52
-587.48
-576.89
-565.32
-552.79
-539.34
-524.98
-509.74
-493.65
-476.74
-459.04
-440.59
-421.43
-401.58
-381.08
-359.99
-338.32
-316.14
-293.47
-270.36
-246.86
-223.01
-198.86
-195.26
-174.59
-150.65
-127.04
-103.81
-81 .01
-58.68
-36.86
-15.59
5.08
25.12
44.49
63.16
81.08
98.22
114.55
130.04
144.67
158.39
171.19
183.04
184.71
5964705.63
5964683.24
5964661.36
5964640.03
5964619.28
5964599.17
5964579.72
5964560.97
5964542.96
5964525.73
5964509.30
5964493.71
5964478.98
5964465.15
5964452.25
5964440.28
5964429.29
5964419.29
5964410.30
5964402.33
5964395.40
5964389.53
5964388.79
5964383.98
5964377.36
5964369.69
5964361.00
5964351 .29
5964340.58
5964328.90
5964316.27
5964302.71
5964288.24
5964272.90
5964256.72
5964239.72
5964221.93
5964203.40
5964184.15
5964164.22
5964143.66
5964122.49
5964100.77
5964097.58
675951.49
675962.61
675974.69
675987.72
676001.66
676016.50
676032.20
676048.73
676066.07
676084.18
676103.01
676122.55
676142.75
676163.58
676184.98
676206.93
676229.38
676252.29
676275.61
676299.30
676323.32
676347.62
676351.23
676372.02
676396.13
676419.92
676443.35
676466.39
676488.97
676511.07
676532.64
676553.64
676574.03
676593.76
676612.81
676631.13
676648.70
676665.47
676681 .42
676696.51
676710.72
676724.02
676736.38
676738.13
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-4363.13
-4338.23
-4313.25
-4288.26
-4263.28
-4238.38
-4213.60
-4188.99
-4164.59
-4140.45
-4116.62
-4093.14
-4070.05
-4047.41
-4025.25
-4003.61
-3982.54
-3962.08
-3942.27
-3923.14
-3904.72
-3887.07
-3884.56
-3869.63
-3851.44
-3832.51
-3812.90
-3792.62
-3771.73
-3750.25
-3728.24
-3705.73
-3682.77
-3659.40
-3635.67
-3611.62
-3587.29
-3562.73
-3538.00
-3513.13
10.00
10.00
10.00
10.00
-3488.17
-3463.17
-3438.19
-3434.55
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 4
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 TD
--------- --- -- - - --------- ---- - ----------- -- - ---- ---- --.. - -- -- -- --- - - -- -- -.. -- --- - -- - --- - -- -- ------- -- --- ---------- -----
BP Amoco
WELLPATH DETAILS
PI..a 15-41.
500282241202
Pa.... Wollpath,
Tio - MD,
15-41
10710.oa
RIa'
Ref. Da"""
V.soctloa
bllo
51,41 712%11184 aula
...2511
O.'I1I!;
0.00
~~
:::::--rto
0.00
150.00'
0.00
REFERENCE INFORMATION
Co-ordinate (NÆ) Reference: Well Centre: 15-41, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Slot - 41 (O.DON,O.DOE)
Measured Depth Reference: 58: 41 712211994 00:00 66.25
Calculation Method: Minimum Curvature
IECTJOH DETAILS
I,e MD Ine AzI TVD .N14 ..,... DLoI TFon Vkc T...ot
1 1061...3 1D.46 D.15 '3&6.34 5017.Z5 -1011.22 D.DD D.DO -5......
2 1D71D.DD 11.11 D.33 1477.7' 543s.13 -101'.14 ,..0 1.74 -52'8.03
3 11D3s... OD". 12...5 ......... 5342.23 -848.53 3O.DD 128.00 -5050.77
4 1117.... OD.DD 143.32 .....70 5238.03 .7...25 1D.DD ".DO """.67
5 1152"" OD.DD "0.32 0""70 4913.46 -.D1 1D.DD OO.DD -4573.21
0 1227.... OO.DD 103.32 0"8.70 4372.77 -185.20 1D.DD 27D.DD -3660U6
7 1277...0 OD.DD 153.32 0..8.70 407"'2 164.71 1D.DD 00.00 -3434.55
ANNOTATiONS
TARGET ÐETAI.S
1VO -.s <EJ-W Shop,
""'BT2.1 860000 4"5" ..,,'" "'"
""'BT2.2 860000 <5«1.39 "".11 "'"
""1BT2.3@ID 8600.00 40<3.52 2...« "'"
_5100n
C
æ 5000
0
0 4900
...
-
+,,4800
-
.c
1:: 4700
0
Z 4600
-
-
.
-
.c 4500 .
...
:I
0 4400 ..
f)
TVD
MD b..laüo.
831&.34 10.1..83 TIP
8477.78 10710.oa KOP
"'0.08 11035.00 1
""8.7. 11171..' 2
"".71 11521.11 3
"".71 12271." 4
""'.7" 12771." TO
8150
¡
i
!
J
i
I
i
I
I
j
I
I
,
,
,
i
i
I
I
j
I
I
I
4ÆJ.
8200
bp
LEGEND
15-41 (15-41)
15-41 (15-41AP61)
n~ PIBn#2 15-416
Plan #2
~
: 15-41 (15-41AP61)1 '
/,
I 15-41 (15-41)( V
ï
I~~'
~i
I
I
I
i
i
i
i
i
I
I
i
\
I
I
\
I
I
I
\
I
\
I
\
I
I
\
\
I
\
I
I
\
\
\
\
\
i
\
I
\
\
I
I
\
\
\
\
\
\
\
\
,
I
\
\
\
\
I
\
\
\
i
I
.1.
+
fT5416 T2.21
T
tl
4
rn
~.
Azimuths to True North
Magnetic North: 26.69'
Magnetic Field
Strength: 57500nT
Dip Angle: 80.80.
Date: 7/10/2001
Model: BGGM2001
+---i 15-41612.11
Ur
l .L 5-lliUUJ
.ý"
3J
.I
Plan: Plan #2 (15-41/Plan#215-41B)
Created By: Brij Polnis Date: 7/10/2001
Cnn(nt;1 In~orm3I¡oE.
D,,':(~. (l¡O71 :.>.n.(¡c,13
E.rn~.ii: 'imj.óo:ni:~X;:.i(jl.Cq.wm
6:¡~"r Hughe~ IN~f.Q' ¡90ìj ;:6ì.ft';CI
-~..
cd
æl.ii#f1§:4_1I!1
TO'
+,'
8250
_8300
C
æ 8350
0
II) 8400
-
.c
'S. 8450
Q)
Q 8500
-
58550
1:
Q) 8600'
>
Q) 8650
2
I- 8700
f
~.
:
: "
?,. . .,,~.
'"
5600,
¡ 15-416)"2.3@TD;
. .
-2100-2000-1900-1800-1700-1600-1500-1400-1300-1200-1100-1000 -900 -800 -700 -600 -500 -400 -300 -200 -100
West(-)/East(+) [100ft/in]
8750
8800
8850'
5500
5400
5300
5200.
4300 .
4200'
4100
4000m-
3900
0
100
200
500
~~
300
400
f3l
i TD]
" t
. I
;-Plan.-z 15-41ßí ;'
¡;5-o\16-T2.3@TD(
8900 .' . .. ":'."."':'.'" .'.' .' .
-5300 -5250 -5200 -5150 -51 00 -5050 -5000 -4950 -4900 -4850 -4800 -4750 -4700 -4650 -4600 -4550 -4500 -4450 -4400 -4350 -4300 -4250 -4200 -4150 -4100 -4050 -4000 -3950 -3900 -3850 -3800 -3750 -3700 -3650 -3600 -3550 -3500 -3450 -3400 -3350
Vertical Section at 150.00. [50ft/in]
7/10/2001
5:19 PM
.\
("
,
2."CT
10,000 psi
Pack-Off
Lubricator
Blind/Shear
7 1/16"
Pi pelS lips
('
...
~"
PipelSlips
7 1/16"
Pipe/~/;p5
7 1/16- x 5,000 psi
..
31 "
d 7«,
...
~"
SWAB OR MASTER VALVE
H 193316
{'
(
('
DATE
07ìÕ6/0i
CHECK NO,
OOi9:3316
DATE
GROSS
VENDOR
DISCOUNT
INVOICE I CREDIT MEMO
DESCRIPTION
NET
07020i ëKO7020iC
PYMT OMMENTS:
HANDL NG INST:
iOO_OO
100.00
Per it to Drill ee
S/H - Terrie Hub le X4628 or
Sandra Ste man X4750
,,5.YJ~
rHE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
.'.' .". ,.' ",. ..
,TOTAL"'"
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H
193316
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
412
00193316
PA'j'
ONE HUNDRED & 00/100************************************* US DOLLAR
, DATE
97/0'6/01
II
AMOUNT
. $lOO,OAI
To The
ORDER
Of:
ALASKA OIL AND GAS
CONSERVATION COMMISSION'
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE
NOTVALID AFTER 120 DAYS
AK 99501
n " ......'-::-'--.
\Lr-iß {J~.
III . g :1 :1 ¡. b III I: 0 ~ ¡. 20 :18 ., 5 I: 00 8 ...... ¡. ., III
~ ~~NSMIT AL LETTER CHECK LIJ.
CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME flJ /L /5- C¡i 6
CHECK 1
STANDARD LETTER
D EVELO PMENT
DEVELOPMENT
REDRILL /
EXPLORATION
INJECTION WELL
INJECTION WELL
REDRILL
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
,..,
ANNULAR DISPOSAL
<--J YES
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a new wellbore segment of existing well
. Permit No, API No.
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(f), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
" -"""'--..-.-
. "-"-,.-,-,,,,
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . .
ANNULUS
<--J YES +
SPACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Companv Name) will assume the liability of any protest to
the spacing exception that may occur.
. t.(
WELL PERMIT CHECKLIST COMPANY WELL NAME /ç: t// /5 PROGRAM: exp - dev - redrll a..- serv well bore sag _ann. disposal para req -
FIELD & POOL L 7J INIT CLASS -V A ':")/ L- GEOL AREA 89 D UNIT# () / / &, ~() ON/OFF SHORE
ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . . . . . . . .
2. lease number appropriate. .. . . . . . . . . . . . . . . . . N
3. Unique well name and number. .. . . . . . . . . . . . . . . . ' N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . N
5. Well located proper distance from drilling unit boundary. . . . N
6. Well located proper distance from other wells.. . . . . . . . . ' N
7. Sufficient acreage available' in drilling unit.. . . . . . . . . . . N.
8. If deviated. is wellbore plat included.. . . . . . . . . . . .'. . N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . . . . N
11. Permit can be issued without conservation order. . . . . . . . ' N
12. Permit can.be issued without administrative approval.. . . . . N
13. Can permit be approved before 15-day wait.. . . . . . . . . . ) N
~~: ~~~::~:~;~i~~~~e:1I kn~~' US'DWs.' '. '. '. '. '. '. '. '. '. '. ~ ~+- i_- \ ~
16. CMTvol adequate to circulate on conductor & surfcsg. . . . . Y N \ ,::>-Wt.~CL'O~ ~~'rSV\~ ~<è..\'
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . N "')
18. CMT will cover all known productive horizons. . . . . . . . . . N
19. Casing designs adequate for C. T. B & permafrost. . . . . . . N \--"- ~ ':- \
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N <L.'{..\~ '~~ r\ t ~ ~,t:...'!'..,,)~ ~ ~
21. If a re-drill. has a 1Q.403 for abandonment been approved. . . N 'sO \ -d-C - :> \' ,,~~~ r\ .
22. Adequate wellbore separation proposed.. . . . . . . . . . . . N ~~c~~ ~~~~~~"t . ~c~
23. If diverter required. does it meet regulations. . . . . . . . . . N ~
24. Drilling .fluid program schematic & equip list adequate. . . . . N .
D_ATE ~~: ~g~~spr~~~~:~;e:~~~;~~i~~~;nt~sÙ~ . . .. '~Ö' ~sig: ~ \-\~~ ~~~~~ ~~Co ~\
~/6--C\ . 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . . N ,
28. Work will occur without operation shutdbwn. . . . . . . . . . . .t!-.
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y Qi)
GEOLOGY. 30. Permit can be issued w/o hydrogen sulfide measures. . . . . Y N ~
31. Data presented on potential overpressure zones. . . . . . . Y
. 32. Seismic anal~~is of shallo~ gas zones. . . . . . . . ~. ... A N
AP R ..QAT~ 33. Seabed condition survey (If off-shore). . . . . . . . . . .. ..' Y N
/./7"(') /34. Contact name/phone for weekly progress reports [expI tory only] Y N
NNULAR DISPOSAL35. With proper cementing records. this plan .
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surface; .' .' .
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and .
E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular COMMISSION:
~Þ8 ~ f~41 :;.~ -...' . ~~~ (h t
APJ?:ß... DATE I
~ 7./9'0
ENGINEERING
APPR
Y N
Y N
DATE
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)
"-
'.
N-~ o..~~~
"
",-.
'-',
.,
" '-.
...... "".
" '--,-------
Com ments/lnstructions:
/
/'
/'/'
c
0
Z (
0
-t
:E
:::0
-
-t
m
-
z
-t
:J:
-
en
:Þ
::u (
m
»
/'
(
:(
Well History File
APPENDIX
Information of detailed nature that is not
,
particularly germane to the Well Permitting Process
but is part of the history file. .
To improve the readability of the Well History file and to
simplify finding information. information of this
nature is accumulated at the end of the file under APPENDIX.
No special 'effort has been made to chronologically
. .
organize this category of information.
(
(
(JuJ -I Lj i?J
/ [) fd. I
**** REEL READER ****
MWD
02/03/27
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
02/03/27
208288
01
1.75" NaviGamma - Gamma Ray
*** LIS COMMENT RECORD ***
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
Remark File Version 1.000
Extract File: ldwg.las
-Version Information
VERSo
WRAP.
-Well Information Block
#MNEM.UNIT Data Type
#--------- -------------
STRT.FT 10611.0000:
STOP.FT 11278.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMPo COMPANY:
WELL. WELL:
FLD. FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API. API NUMBER:
-Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 22
TOWN.N 11N
RANG. 14E
PDAT. MSL
EPD .F 0
LMF . RKB
FAPD.F 66.25
DMF KB
EKB .F 66.25
EDF .F N/A
EGL .F N/A
CASE.F N/A
OSl . DIRECTIONAL
-Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is realtime data.
(4) Well 15-41BPB1 was kicked off @ 10690' MD (8458' SSTVD) from the
wellbore of Well 15-41.
(5) Well 15-41BPB1 was drilled to TD at 11278' MD (8681' SSTVD) on Run 10.
(6) The interval from 11258' MD (8683' SSTVD) to 11278' MD (8681' SSTVD)
was not logged due to sensor to bit offset.
(7) The data presented here is final and has been depth
shifted to a PDC (Primary Depth Control) supplied by BPX (SWS, 08-0ct-2001).
1.20:
NO:
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
-------------------------------
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration, Inc.
15-41BPB1
Prudhoe Bay Unit
1474' SNL, 4566' FEL
North Slope
Alaska
Baker Hughes INTEQ
1.75" NaviGamma - Gamma Ray
28-Sep-01
500292249271
Description
-------------------------------
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(
'I'
~
(8)
A Magnetic Declination correction of 26.59 degrees has been applied
to the Directional Surveys.
MNEMONICS:
GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units)
ROPS -> Rate of Penetration, feet/hour
TVD -> Subsea True Vertical Depth, feet
SENSOR OFFSETS:
RUN
1
2
3
4
5
6
7
8
9
10
G AMMA
19.20 ft.
19.20 it.
19.61 it.
20.26 ft.
20.26 it.
19.38 it.
19.42 it.
19.42 it.
19.42 it.
19.42 ft.
CURVE SHIFT DATA
DIRECTIONAL
24.20 it.
24.20 it.
24.61 ft.
25.26 it.
25.26 ft.
24.38 ft.
24.42 it.
24.42 ft.
24.42 ft.
24.42 ft.
DISPLACEMENT
1. 61621
1.41406
BASELINE,
10625.7,
10646.7,
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
MEASURED,
10627.3,
10648.1,
Tape Subfile: 1
Minimum record length:
Maximum record length:
**** FILE HEADER ****
MWD
.001
1024
76 records...
10 bytes
13 2 bytes
*** INFORMATION TABLE: CONS
MNEM VALU
----------- -----------------
WDFN
LCC
CN
Ï^1N
FN
COUN
STAT
mwd.xtf
150
BP Exploration, Inc.
15-41BPB1
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray dated 08-0ct-01.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
GR
ROP
GR
ROP
----------------------------------------------------
GRAX10
ROPS10
0.0
0.0
* FORMAT RECORD
(TYPE# 64)
(
('
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
1
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name
Tool
Code Samples Units
Size
Length
1
2
GR
ROP
MWD
MWD
68
68
1
1
API
F/HR
4
4
4
4
-------
8
Total Data Records:
32
Tape File Start Depth = 10611.000000
Tape File End Depth = 11278.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
41 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
MWD
.002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
----------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
mwd.xtf
150
BP Exploration, Inc.
15-41BPB1
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX
GRAX
GRAX
0.0
~.
ROPS
ROPS
0.0
ROPS
* FORMAT RECORD
(TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name
Tool
Code Samples Units
1
2
68
68
API
F/HR
1
1
GRAX
ROPS
MWD
MWD
Total Data Records:
32
Tape File Start Depth = 10611.000000
Tape File End Depth = 11278.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3
41 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
02/03/27
208288
01
**** REEL TRAILER ****
MWD
02/03/27
BHI
01
Tape Subfile: 4
2 records...
Minimum recúrd length:
Maximum record length:
13 2 bytes
13 2 bytes
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
(
1
Size
Length
4
4
4
4
-------
8
(
('
DEPTH GR ROP
10611.0000 -999.2500 -999.2500
10611.2500 -999.2500 -999.2500
10700.0000 17.4917 12.2419
10800.0000 18.9206 17.4863
10900.0000 104.1985 25.8769
11000.0000 15.6337 61.0171
11100.0000 25.1439 93.0221
11200.0000 19.6593 39.7422
11278.0000 -999.2500 67.2902
Tape File Start Depth = 10611.000000
Tape File End Depth = 11278.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
10611.0000 12.9160 -999.2500
10611.2500 12.2450 -999.2500
10700.0000 16.1410 9.1730
10800.0000 18.6870 20.6050
10900.0000 87.8000 26.3440
11000.0000 16.4800 63.3100
11100.0000 24.7310 93.5720
11200.0000 21.5020 53.1060
11278.0000 -999.2500 -999.2500
Tape File Start Depth 10611.000000
Tape File End Depth = 11278.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS
(
(
(
clOJ-I'-! ~
!ù71o0
**** REEL HEADER ****
MWD
02/03/27
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
02/03/26
208288
01
1.75" NaviGamma - Gamma Ray
*** US COMMENT RECORD ***
flIrt!!!!!!!!!!!!!! Remark File Version 1.000
II! !!!!!!!!!!!!!!!! Extract File: Idwg.las
-Version Information
VERSo 1.20: CWLS log ASCII Standard -VERSION 1.20
WRAP. NO: One line per frame
-Well Information Block
#MNEM.UNIT Data Type Information
#--------- ------------- -------------------------------
STRT.FT 10600.0000: Starting Depth
STOP.FT 12777.0000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMPo COMPANY: BP Exploration, Inc.
WELL. WELL: 15-41B
FLD . FIELD: Prudhoe Bay Unit
LOC. LOCATION: 1474' SNL, 4566' FEL
CNTY. COUNTY: North Slope
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 1.75" NaviGamma - Gamma Ray
DATE. LOG DATE: 06-0ct-01
API . API NUMBER: 500292249202
-Parameter Information Block
#MNEM.UNIT Value Description
# --------- ------------------------- -------------------------------
SECT. 22 : Section
TOWN.N IIN : Township
RANG. 14E : Range
PDAT. MSL : Permanent Datum
EPD .F 0 : Elevation Of Perm. Datum
LMF . RKB : Log Measured from
FAPD.F 66.25 : Feet Above Perm. Datum
DMF . KB : Drilling Measured From
EKB .F 66.25 : Elevation of Kelly Bushing
EDF .F NIA : Elevation of Derrick Floor
EGL .F NI A : Elevation of Ground Level
CASE.F NI A : Casing Depth
OS 1 . DIRECTIONAL : Other Services Line 1
-Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is realtime data.
(4) Well 15-41B was kicked off@ 10705' MD (8473' SSTVD) from the
wellbore of Well 15-41.
("
(
(5) Well 15-41B was drilled to TO at 12777' MD (8734' SSTVD) on Run 21.
(6) The interval from 12763' MD (8733' SSTVD) to TO
was not logged due to sensor to bit offset.
(7) The data presented here is final and has been depth
shifted to a PDC (Primary Depth Control) supplied by BPX (SWS, 08-0ct-200 1).
(8) A Magnetic Declination correction of26.69 degrees has been applied
to the Directional Surveys.
MNEMONICS:
GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units)
ROPS -> Rate of Penetration, feet/hour
TVD -> Subsea True Vertical Depth, feet
SENSOR OFFSETS:
RUN GAMMA DIRECTIONAL
NIA N/A N/A
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
10609.3, 10608.9, ! -0.40332
10648.5, 10648.5, ! 0
10745.6, 10750.4, ! 4.84863
10756.9, 10763.1, ! 6.2627
10782.5, 10790.0, ! 7.47461
10857.2, 10861.0, ! 3.83887
10890.5, 10894.9, ! 4.44531
10901.6, 10906.1, ! 4.44434
10939.6, 10942.2, ! 2.62598
10995.6, 10992.6, ! -3.03027
11013.7, 11009.1, ! -4.64648
11035.4, 11030.7, ! -4.64648
11100.3, 11094.8, ! -5.45508
11187.8,11179.5, ! -8.2832
11233.2, 11232.2, ! -1.00977
11672.2, 11658.1, ! -14.1416
11703.1,11688.8, ! -14.3438
11730.0, 11715.7, ! -14.3428
11793.1,11782.8, ! -10.3027
11873.8, 11863.9, ! -9.89941
11963.4, 11954.9, ! -8.48535
12038.6, 12036.0, ! -2.62598
12092.7, 12090.5, ! -2.22168
12291.9, 12308.1, ! 16.1621
12350.0,12361.1, ! 11.1104
12356.9, 12366.2, ! 9.29297
12364.1, 12378.3, ! 14.1416
12439.7, 12448.8, ! 9.09082
12519.8, 12528.7, ! 8.88965
12596.1, 12606.2, ! 10.1006
12619.6, 12627.1, ! 7.47461
12692.7, 12699.4, ! 6.66699
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1
97 records...
Minimum record length:
Maximum record length:
10 bytes
132 bytes
**** FILE HEADER ****
MWD .001
1024
(
(
*** INFORMATION TABLE: CONS
MNEM V ALU
--------------- ---- --------
WDFN mwd.xtf
LCC 150
CN BP Exploration, Inc.
WN I5-41B
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
I!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray dated 08-0ct-0 1.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------- ----------- -- ------- ---------- -- ---
GR GR
ROP ROP
GRAXI9
ROPS 19
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth 10: F
2 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 API 4 4
2 ROP MWD 68 1 FIHR 4 4
8
Total Data Records:
52
Tape File Start Depth = 10600.000000
Tape File End Depth = 12777.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
61 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
(
(
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM V ALU
----------------------------
WDFN mwd.xtf
LCC 150
CN BP Exploration, Inc.
WN 15-4lB
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
I!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw data.
* * * INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
--------- ---- --------------------- --------- ---------
GRAX GRAX
ROPS ROPS
GRAX
ROPS
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ill: F
2 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 API 4 4
2 ROPS MWD 68 1 FIHR 4 4
8
Total Data Records: 52
Tape File Start Depth = 10600.000000
Tape File End Depth = 12777.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
(
('
Tape Subfile: 3
**** FILE TRAILER ****
61 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** TAPE TRAILER ****
MWD
02/03/26
208288
01
**** REEL TRAILER ****
MWD
02/03/27
BID
01
Tape Subfile: 4
2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
Tape Subfile I is type: LIS
Tape Subfile 2 is type: LIS
DEPTH
10600.0000
10600.5000
10700.0000
10800.0000
10900.0000
11000.0000
11100.0000
11200.0000
11300.0000
11400.0000
11500.0000
11600.0000
11700.0000
11800.0000
11900.0000
12000.0000
12100.0000
12200.0000
12300.0000
12400.0000
12500.0000
12600.0000
12700.0000
12777.0000
GR ROP
-999.2500 -999.2500
-999.2500 -999.2500
13.5355 36.0160
17.3110 19.7038
37.0590 39.3791
29.8758 42.0819
31.3763 76.3997
27.6809 79.5971
19.7067 56.6944
20.9166 70.7735
20.5910 18.7120
31.5858 81.6445
20.2333 61.0275
75.0663 85.9997
36.4227 74.2584
78.3549 69.5326
47.7471 76.6965
56.8806 116.5229
64.2673 118.1525
62.4156 173.4116
37.8244 183.7744
34.5417 553.1073
53.6539 177.7212
-999.2500 134.2179
Tape File Start Depth = 10600.000000
Tape File End Depth = 12777.000000
Tape File Level Spacing = 0.500000
(
(
,
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
10600.0000 -999.2500 -999.2500
10600.5000 -999.2500 -999.2500
10700.0000 13.8660 35.3820
10800.0000 12.7460 17.6880
10900.0000 52.1240 30.7000
11000.0000 27.3430 33.0930
11100.0000 37.6590 67.8950
11200.0000 30.3140 71.7190
11300.0000 18.0080 68.0960
11400.0000 19.8830 86.7300
11500.0000 22.2510 30.5030
11600.0000 23.4390 75.8240
11700.0000 31.4170 62.2660
11800.0000 40.1250 77.4480
11900.0000 29.0410 78.5480
12000.0000 77.9300 68.0030
12100.0000 55.8590 132.4290
12200.0000 58.2350 101.6390
12300.0000 52.3400 154.3160
12400.0000 51.2760 163.8330
12500.0000 33.3970 122.7740
12600.0000 34.2070 213.8690
12700.0000 29.7220 259.8710
12777.0000 -999.2500 -999.2500
Tape File Start Depth = 10600.000000
Tape File End Depth = 12777.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS