Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
191-143
Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWeIISiteEnginee@bp.com> Sent: Sunday, April 14, 2019 2:13 PM To: AK, GWO Well Integrity Engineer, AK, OPS EOC Specialists; AK, OPS FS2 DS Ops Lead; Ak, OPS FS2 Facility PTL; Ak, OPS FS2 Field PTL; AK, OPS FS2 OSM; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL, Alatalo, Travis; G GPB FS2 Drillsites; Nottingham, Derek, Ohms, Danielle H; Rupert, C. Ryan; Smith, Travis T (CONOCOPHILLIPS); Stechauner, Bernhard; Summers, Matthew; Worthington, Jessica; Wallace, Chris D (DOA) Cc: AK, GWO Completions Well Integrity; AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity, AK, GWO SUPT Well Integrity, AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R; Tempel, Joshua; Worthington, Aras 1; Regg, James B (DOA); AK, GWO Well Integrity Well Information Subject: NOT OPERABLE: Injector 04-42 (PTD# 1911430) Well could not be brought online for diagnostics All, Injector 04-42 (PTD# 1911430) was made under evaluation on 4/6/2019 in order to perform warm diagnostics post surface casing leak repair. Several attempts were made to bring the well online, but injectivity into the reservoir could not be established. At this time the well is reclassified as Not Operable and will remain shut in. The production engineer will evaluate the well for a plan forward. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 From: AQGWWO ell Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Saturday, April 9 10:49 AM To: AK, OPS EOC Specialists < SEOCSpecialists@bp.com>; AK, OPS FS2 DS Ops Lead <AKOPSFS2DSOpsLead@bp.com>; Ak, FS2 Facility PTL <AKOPSFS2FacilityPTL@bp.com>; Ak, OPS FS2 Field PTL <AKOPSFS2FieldPTL@bp.com>; AK, OPS FS2 O <AKOPSFS20SM1@bp.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GP st Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>; AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>; Alatalo, Tra tTravis.Alatalo@bp.com>; G GPB FS2 Drillsites <ggpbfs2dril[sites@BP.com>; Nottingham, Derek <Derek.Nottingha com>; Ohms, Danielle H <Danielle.Ohms@bp.com>; Rupert, C. Ryan < Ryan. Rupert@BP.com>; Smit , avis T (CONOCOPHILLIPS) <travis.smithl@bp.com>; Stechauner, Bernhard <Bernhard.Stechauner@bp.com>;comers, Matthew <Matthew.Summers@bp.com>; Worthington, Jessica <Jessica.Worthington@bp.com>; thris.wallace@alaska.gov' <chris.wallace @a laska.gov> 1 Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Saturday, April 6, 2019 10:49 AM To: AK, OPS EOC Specialists; AK, OPS FS2 DS Ops Lead; Ak, OPS FS2 Facility PTL; Ak, OPS FS2 Field PTL; AK, OPS FS2 OSM; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL, Alatalo, Travis; G GPB FS2 Drillsites; Nottingham, Derek; Ohms, Danielle H; Rupert, C. Ryan; Smith, Travis T (CONOCOPHILLIPS); Stechauner, Bernhard; Summers, Matthew, Worthington, Jessica; Wallace, Chris D (DOA) Cc: AK, GWO Completions Well Integrity; AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity, AK, GWO SUPT Well Integrity, AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis 1; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R; Tempel, Joshua; Worthington, Aras 1; Regg, James B (DOA) Subject: UNDER EVALUATION: Injector 04-42 (PTD# 1911430) Place on injection to evaluate conductor top job repair All, Injector 04-42 (PTD# 1911430) was made not operable on 8/16/2012 for having a confirmed surface casing leak to gas. On 6/10/2018 a remedial conductor top job was preformed to mitigate the surface casing leak, and on 6/13/18 the well passed an OA integrity test to 1,176psi. Per sundry 318-164 the well is now approved to be placed on injection to evaluate the success of the repair. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for monitoring. An AOGCC witnessed MIT -IA will be performed once the well is on stable injection. Please mind fluid packed annuli when bringing the well on. Reply with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Operations Performed Operator Name: BP Exploration (Alaska), Inc un, I / Iwo I1. Abandon ❑ Plug Perforations 0 Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate 11 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Set HEX Plug 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development ❑ Stratigraphic 11Service Exploratory ❑ 0 5. Permit to Drill Number 191-143 3, Address: P.O. Box 196612 Anchorage, AK 99519-6612 6. API Number: 50-029-22229-0"0 7. Property Designation (Lease Number): ADL 028325 8. Well Name and Number: PBU 04+42 9. Logs (List logs and submit electronic and panted data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: 4-1/2" 12.6# L-80 27-8433 27-8239 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Penn Packer 8217 8038 true vertical depth) 4-1/2" Baker SABL Permanent Packer 8363 8173 12. Stimulation or cement squeeze summary: Total Depth: measured 9337 feet Plugs measured 8800/9018 feet Gas-Mcf Water -Bbl We vertical 9091 feet Junk measured None feet 0 Effective Depth: measured 8800 feet Packer measured 8217 / 8363 feet Daily Report of Well Operations 0 Exploratory ❑ Development ❑ Service 0 Stratigraphic ❑ true vertical 8585 feet Packer true vertical 8038/8173 feet Authorized Name: Worthington, Jessica Casing: Length: Size: MD: TVD: Buret: Collapse: Structural j5 '%BDMS�tU 14 2018 Submit Original Only Conductor 80 20" 31 - 111 31 -111 1490 470 Surface 3473 10-3/4" 30-3503 30-3503 5210 2480 Intermediate 8692 7-5/8" 29-8721 29-8511 6890 4790 Production Liner 906 5-1/2" 8430-9336 8237-9090 7740 6280 Perforation Depth: Measured depth: 8756-9190 feet True vertical depth: 8544 - 8952 feet . Tubing (size, grace, measured and true vertical depth) 4-1/2" 12.6# L-80 27-8433 27-8239 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Penn Packer 8217 8038 true vertical depth) 4-1/2" Baker SABL Permanent Packer 8363 8173 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 20 0 Subsequent to operation: 0 0 0 4 0 14.Attachments: (requlm5 per20MC25.070.25.071, a25.2W) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development ❑ Service 0 Stratigraphic ❑ 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR ❑ WINJ ❑ WAG ❑ GINJ 0 SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Worthington, Jessica Contact Name: Worthington, Jessica Authorized Title: Well Intervention Engineer Contact Email: Jessica.Worthington0bp.com Authorized Signature: D eer: M Contact Phone: +1 907 564 4281 Farm 10.404 Revised 04/2017 j5 '%BDMS�tU 14 2018 Submit Original Only Douglas, David (Wipro Technologies) From: Worthington, Jessica Sent: Wednesday, December 12, 2018 10:39 AM To: Douglas, David (Wipro Technologies); Lastufka, Joseph N Subject: 04-42 HI! The flowback portion for this well became complicated. Due to the nature of the anticipated fluids to be flowed back and wellstock available to assist with the flowback, the original piping plan that would be used to assist the flowback changed. The updated piping configuration would require more than 700' of hard line rig up. Due to the increased risk associated with substantial footage of hardline install and operation, along with increased costs, the flow back portion of this job has been cancelled for now. The wellwork portion of this job was beneficial and the well will remain in its current completion configuration. We do anticipate the conversion to happen at some point in the future, when flowback risks can be better understood and mitigated. Thank you, Jess (Sayers) Worthington I BPXA Well Intervention and Drill Site 04, 17 and PSI Engineer I Office 907-564-4281 I Cell 907-602-87151 0essica. worth ingtono b o.com of MIRU PT. RIH W/ INTERWELL280-550 HEX PLUG. SET INTERWELL HEX PLUG ME @ 8804', CCL TO MID ELEMENT = 13.6', CCL STOP DEPTH = 8790.4'. TOP OF PLUG @ 8800' TIE INTO SCHLUMBERGER PERFORATING RECORD DATED 03 -DEC -2009. RDMO FINAL T/I/O = 2400/0/50 PSI ***JOB COMPLETE. WELL LEFT SHUT-IN ON DEPARTURE- E= Law W13LF.EAD = REF LOG: ATLAS DIL ON 1226/81 ACTI.LATOR-_..: BA OKB. R_EV = SPF BF. EFEV = Opn/Sgz DATE KOP= 6 Max A ngle = -2--5*—Ca Datum MD = 6 DatumTVD= 88 20' O0PDUCTOR 91.5#, 1-I-40, ID = 19.124'115' 10-3/4' CSG, 45.5#, L-80 BTC, D = 9.950' 1 3503' Minimum ID = 3.725" @ 8423' 4-112" PARKER SWN NIPPLE 4-12' TBG, 12-6#, L-80 TCI, .0152 bpf, D = 3.958' 8295' TBG STUB (0426/08) 8298' ITOPOF 5-72' LNR 8430' 2' TBG, 12.6#, L-80 BTC -K 8436' 52 bof. D = 3 958' CSG, 29.7#, L-80 BTC, D = 6.875' PERFORATION SLMNARY REF LOG: ATLAS DIL ON 1226/81 ANGLE AT TOP PERF.19-08756 Wte: Refer to Production DB for Kistorical pert data SIZE SPF NTERVAL Opn/Sgz DATE 3-3/8' 6 8756-8786 0 12/03/09 3-3/8' 6 8814-8880 C 11/11105 3-3/8' 14 9142 - 9148 C 0120/92 3-3/8' 10 9145-9165 C 07/14/96 33/8' 10 9170-9190 C 07/14/96 1 9246' 1 5-12- LW 17#, L-80 FL4S, _0232 bpf, D = 4.88992' FTD 04,42 SAFETY NOTES: 1yO41/2-MUS X NI', 0=3.613- 2795' ESTMATEDTOPOFC9r84T 8211' 7-5/8" X 4-1/2' BKR S-3 PKP ID 8235' 4-12' FES X NP, D = 3.813' 8298'J–j7-518'X4-12'UJQUE0VBRSFDT iW BKRLOC/ SEAL ASSY (15' STEM, D= 3.875' BKR PBR w 1K-22 ANCnH0' 8365' 7-518' X 4-112" BKR SABL PICK, D= 3.875' 8370' 6' MLLOUr DCTBSDN, ID = 4.81' 83� 5-12" X 412' X0. D = 3.958' 8423' 4-12' PKR SWN NP, D = 3.725' 8430' 7-5/8" BKR TIEBACK SLV, D=? 6436' 4-12' VVLEG, D = 3.958' 8437' 7-5/8- X ?- BKR LNR TOP PKR w / BKR HY FLO LNR HGIR, ID = ? 843 9_AD LOGGED ON 03/01 92 R i '/' X 5-12" X0, [—)= ? 8800- NTERhal- 280-550 FIX PLUG 9009' 5-12' MARKEIR J(XNT 9018' EST TOP Or CMT(11/03/05) 183'-91 ST SAND FLLJG 01/03/05) DATE REV BY ODWAENTS DATE I REV BY I COM.INTS 12/31191 N28E ORIGINAL COMPLETION 10WA81 PJC ORLG ORAFTO0RfEMION1S 04/3W08 WES FIN0 12111/09 JHYSV ADPEW(12103109) 0721105 MCUPJC OA MM SQZ 0121/15 MMM SET XX PLUG (01/18/15) 11103105 JLG/TLH SAND RUG B CMT CAP 06/25/18 ZV/JMD RJLLEDXXFLLIG(06/21/18) 11/11105 GJB/PJC ADPERFS 10108/18 BTNAC SET HEX PLUG (10/07/18) 10/08108 AW/JM) ORLG DRAFT 0DR;tECTIDNS PRl10HDE BAY L"T WELL N442 PERMT NO: '1911430 AR No: 50-02922229-00 SEF 34, T11 N, R1 5F 456 FT3 8 565' FNL SP Exploration (Alaska) vOF 7'4 • ,t?, THE STATE •• Alaska Oil and Gas ���:►+���� ofALASKA Conservation Commission 7.1ux _= 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 1101X111.1177-n p. Main: 907.279.1433 ALASY' Fax: 907.276.7542 www.aogcc.alaska.gov Eric Dickerman Wells EngineerW `" `- BP Exploration(Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 04-42 Permit to Drill Number: 191-143 Sundry Number: 318-164 Dear Mr. Dickerman: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, COcr\-- Hollis S. French Chair -f DATED this 23 day of April, 2018. S PR 4 2018 FlECEIVED STATE OF ALASKA KA OIL AND GASo:: FOCRONSERVATIONAPPROVAL COMMISSI PLICATION SUNDRY p 1 3 20 AAC 25.280 (5)! (, / (/"F 1. Type of Request: Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Repair Well 0 `l "]"AOGC`C'El 16Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Chanpproved Program 0 Plug for Redrill 0 Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other Conductor Top Job H • 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number 191-143 • 3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development ❑ 99519-6612 Stratigraphic 0 Service m. 6. API Number 50-029-22229-00-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No I2! PBU 04-42 • 9. Property Designation(Lease Number): 10. Field/Pools: ADL 028325 ' PRUDHOE BAY,PRUDHOE OIL' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 9337 9091 • 8235 8054 8235.9018 None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 31-111 31-111 1490 470 Surface 3473 10-3/4" 30-3503 30-3503 5210 2480 Intermediate 8692 7-5/8" 29-8721 29-8511 6890 4790 Production Liner 906 5-1/2" 8430-9336 8237-9090 7740 6280 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 8756-9190 8544-8952 4-1/2"12.6# L-80 27-8433 Packers and SSSV Type: 47-1/2"Baker S-3 Perm Packer Packers and SSSV MD(ft)and ND(ft): 8217/8038 4-1/2"Baker SABL Perm Packer 8356/8167 12.Attachments: Proposal Summary El Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development 0 Service 0' 14.Estimated Date for Commencing Operations: April 21,2018 15. Well Status after proposed work: Oil 0 WINJ 0 . WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Dickerman,Eric be deviated from without prior written approval. Contact Email: Eric.Dickerman©bp.com Authorized Name: Dickerman,Eric Contact Phone: +1 9075644277 Authorized Title: Wells Engineer Authorized Signature: , Date: y/,Z//4 /V COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 31$-1tot4 Plug Integrity 0 BOP Test 0 Mechanical Integrity Test V Location Clearance 0 Other: Post Initial Injection MIT Req'd? Yes ftr"' No 0 Reb Spacing Exception Required? Yes 0 No El Subsequent Form Required: 1 0 — 4 O if, „I Pp 9 ee to to APPROVED BYTHE Li Approved by: COMMISSIONER COMMISSION Date: 12-zi I I S ✓YL. 1/23/iO • 7/45 /./3.`s Submit Form and Attachments in Duplicate Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. bp • • 04-42 Conductor Cement Top Job Intervention Engineer Eric Dickerman (907) 564-4277 Production Engineer Bernhard Stechauner (907) 564-4594 Meredyth Richards (907) 564-4867 History 04-42 is a produced water injector drilled in December 1991. In August 2012, bubbling was noticed in the conductor by surface casing annulus during a pressure test on the Outer Annulus indicating a surface casing leak. The well status was then changed to Not Operable. The well was secured with a downhole plug in the tubing, and the subsequent pressure test on the tubing passed. Current Status The well is classified as Not Operable because of bubbling noticed in the Conductor x Surface Casing annulus during pressure testing. Objective This procedure is to clean out the Conductor x Surface Casing annulus, then top off the annulus - with a cement or polymer blend to re-establish Outer Annulus integrity. Procedural steps Well Diagnostics/Special projects 1. Steam clean the Conductor x Surface Casing Annulus to top of good cement. 2. Perform top job on the Conductor x Surface casing annulus until clean returns are observed at surface. 3. Wait for top job to cure. Well Diagnostics/Well Integrity Superintendent 4. Perform pressure test on the Outer Annulus. Slickline 5. Pull tubing plug. Well Diagnostics/Well Integrity Superintendent 6. Change well status to Under-Evaluation. 7. Place well on injection and monitor conductor/cellar for any leaks. 8. Perform standard AOGCC witnessed pressure test on the Inner Annulus. Change well status to Operable if test passes. TREE= CIW , Vlfat.FEA RC • 04-42 SA�T'ES: ACTUATOR BAKER C OKB.ELEV= 60' BF.ELEV= I 6 I I KOP= 5915 1988' --14-1/2"FEES X MP D=3.813" MIX Angle= 25"@ 7473' Datum MD= 9097 I 2795' -1 ESTIMATB)TOP OF CEMENT DatumWD= 8800'SS 20"CONDUCTOR,91.5#,FI-40,D=19.124" 115' 10-3/4"CSG,45.5#,L-80 BTC,D=9.950" H 3503' , I 8190' -14-1/2"HES X MP,D=3.813" Minimum ID =3.725" @ 8423' IX 8211' H7-5/8"x 4-1/2"BKR S-3 PKR,D=3.870" 4-1/2" PARKER SWN NIPPLE ' 8235' H4-1/2"FES X NP,D=3.813" 8235' H4-1/2"XX PLUG(01/18/15) TC 4-1/2"TBG,12.6#,L-80 I,.0152 bpf,D=3.958" -f 8295' �— r � 8298' I-7-5/8"X 4-1/2"t#VQUEOVERSHOT TBG STUB(04/26/08) H 8298' /I 8346' --I BKR LOC/SEAL ASSY(15 STEM),D=3.875' A8348' H BKR FOR w/K-22 ANC HOR,D=4.50" 8365' -17-5/8"X 4-1/2"BKR SA BL FKR,0=3.875" L8370' —16'MLLOUT EXTENSION,D=4.81" 8375' H5-1/2"X 4-1/2"XO,D=3.958" I 8423` H4-1/2"FKR SINN MP,D=3.725" 8430' -17-5/8"BKR TIEBACK SLV,D=? TOP OF 5-1/2"LNR H 8430' 8436' F-4-1/7WLEG,D=3.958' 4-1/2"TBG,12.6#,L-80 BTC-M, H 8436' / \ 8437` I-7-5/8"X 7 BKR LNR TOP PKR .0152 bpf,D=3.958' w/BKR HY FLO LNR HGR,D=? \ 8438' H ELMD LOGS ON 03/01/92 8446' --I?X 5-1/2"XO,D=? 7-5/8"CSG,29.7#,L-80 BTC,D=6.875" -I 8721' , I PERFORATION SUMMARY I REF LOG: ATLAS DL ON 12/26/81 ANGLE AT TOP PERF:19°Q8756' 9009' H5-1/2"MA RKER JOINT Note:Refer to Production DB for historical perf data 1 c 1111.4 9018' HEST TOP OF CMT(11/03/05) SVE SPF INTERVAL Opn/Sqz DATE 1111111' 1111111 3-3/8" 6 8756-8786 0 12/03/09 9083'-9157' HSAND PLUG(11/03/05) 3-3/8" 6 8814-8880 0 11/11/05 3-3/8" 14 9142-9148 C 01/20/92 3-3/8" 10 9145-9165 C 07/14/96 3-3/8" 10 9170-9190 C 07/14/96 FBTD -I 9246` •'1'1'1'1'1'1 11111111111i1 5-1/2"LNR,17#,L-80 FL4S,.0232 bpf,D=4.892" - 9336' 11111111111i1 11111111111i1 TD H 933T DATE REV BY COMFITS DATE REV BY COMMENTS PRUDHOE BAY UMT 12/31/91 1128E ORIGINAL COMPLETION 10/22/08 PJC DRLG DRAFT CORRECTIONS WE11:X4-42 04/30/08 N4E,S RANO 12/11/09 JE SV ADPERF(12/03/09) MOAT No:'1911430 07/21/05 MGYPJC OA DWN SO2 01/21/15 ILVV/JMJ SET XX PLUG(01/18/15) AR No: 50-029-22229-00 11/03/05 JLG/TL!-! SAND PLUG&CMT CAP SEC 34,T11N,RISE,455'FEL&565 FNL 11/11/05 GJB/PJC ADPEiFS 10/08/08 AW/JIVD DRLG DRAFT COQ BP Exploration(Alaska) • • Loepp, Victoria T (DOA) From: Dickerman, Eric <Eric.Dickerman@bp.com> Sent: Friday,April 20, 2018 11:20 AM To: Loepp,Victoria T (DOA) Cc: Worthington,Aras J Subject: RE: PBU 04-42(PTD 191-143, Sundry 318-164) Conductor Top Job Attachments: 04-42 Surface Casing Primary Cement Job.pdf;04-42 Drilling Report_12-14-1991.pdf Follow Up Flag: Follow up Flag Status: Flagged Victoria, We will follow up this email with a phone call later today. The TOC in the conductor x 10-3/4" annulus is approximately 4ft from the top of the conductor. An integrity test on the OA passed to 1,186 psi on 3-28-2018. The conductor was visually monitored during the test with no fluid movement observed. Attached are records of the initial surface casing cement job. Thank you, Eric Dickerman BP Alaska Wells Group Office: 907-564-4277 Cell: 307-250-4013 From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Wednesday, April 18, 2018 11:02 AM To: Dickerman, Eric Subject: PBU 04-42(PTD 191-143, Sundry 318-164) Conductor Top Job Eric, Please provide information on the initial surface casing cement job. Is the TOC known? Have any diagnostics been performed to determine the location of the surface casing leak? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp(a.alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged 1 • • PRIMARY CASING/LINER CEMENTING SUMMARY csG 103/4 WELL 4-42 DATE 12/14/91 SHOE 3503' RIG Nabors 28E HANGER 33' Casing on bottom at 2230 HRS , Circulated for 90 Minutes. PREFUSH Pumped 100 BELS bbls. of FRESH WATER and of preflush ahead. PRIMARY CEMENT JOS;Started mixing at 2400 Hrs. Used bottom plug?YES Cement volume base on ANNULUS VOL. .0648 plus 100 % excess. Mixed and pumped 2330 cu ft( els bbls, 13^0 sx) of AS-1 cement,wlth Nn additivess mixed at 12.1 ppg, followed by 404 cu ft (---22---bb Is, 350 sx) of CLASS 'G' cement,with 0.2 % D-46. 2.0 % S-1 additives mixed at 15 a PP9. drop plug. Displace with 322 bbl of MUD Calculated displacement was 319 bbls Bump plug with 2000 psi surface pressure. C.I.P.at 0230 hrs j Released pressure;floats HFI rt Pump rate while mixing was 6 1/2 & 4 1/2 BPM@ 12n A 60 psi. While displacing was 14 BPM@ sten TO 13nn psi. Ci O— E T �� 4-„„,,, rte\ cel v_.� .\ c,.-,_ S'vr LES PEAK -:11--).._._. __,-�_ SUPERVISOR Prudhoe Bay Drilling Daily Drilling Report pFL`No: 4,10124 Rpt.NAP 3 Date: 12/14/91 (Days Since SN..,/Est. 2/4 Supv. Init: L P 11✓011: p52 Depth(MD/TVD): 3518 / 3518 Prey(MD): 3060 Progress: 458 Contractor: NABORS 28E Phone: 6594863 Daily Costs: $68,828.86 Est Cum Costs: $178,686.67 Operation at 0600: ND SURFACE ROPE Last sg: 103/4 @ Next Csg: 75/8 @ Shoe Test: wo (size/depth) 3503' (size) 8675' Rig Accept(hr/date): 2130 HRS 12/11/91 Rig Release(hr/date): N/A Mud Data it lata Drilfina,Data Mud Type MBT Bit No. 1 Depth Rot H2O Wt. Weight pH Size 13.500 P.U. S.O. ppg WI. Wt. Viscosity Pm Make STC Avg. Max sec Drag Drag PV/YP Pf Type Al JSL Trq Trq / Btm Off GelsMt Serial No. KR5864 Pump Data, a Pump No. 1 2 API W.L. Chlorides Depth Out 3518 3518 ' ppm MD 7VD / / / Liner Size 6 6 HTHP 100 psi Oil Footage 3408 'Xi ft. ft it. SPM HTHP 500 psi OWR / ART/AST 19.0 / / / GPM Solids ES RPM 110 Tahle'Mtr / `p"' / rPm / rem Sand LOS WOB Pressure Min/Max 5 / 20 Kx / Ks / Kir Hole Vol. Pit Vol. Slow Pump Data bbl. Jets/TFA 121414 .410 Slow P.S. Filter Calcium Bit Costs $16699.00 Cake ppm Daily Mud$ Total Mud$ Dull 4 3 Cl' I ,Slow P.P. $2,761.45 $12579.36 Grade E I 143 ID BHA Description: BHA No: 1 BHA Length: 250.85 Date Last Inspected: 11/23/91 Hours On Jars: 148 3/4 Survey Data Surv.No. 7 Depth(MD) 3472 Angle 1.1 Direction S4.3E Injection Data Injection 4.40 Rate: 3 BPM Pressure: 1000 Source: 4-42 Volume: 20 Type Fluid: DIESEL Well: ppm psi Daily Volume: 200 Cummulative Volume: 3605 4-42 180 MUD BBL BBL Fuel& ater Data Fuel Used: 5492 Fuel Source: BP STORES Drl.Water Used: 1575 Drl.Water Source: VERN LAKE gal BBL Cuttings'Data Weather Data Daily: 182 Cumulative: 476 Storage DS 16 Temp: _20 Wind Speed: 11 Chill Factor: -54 CF CF Site' `F mph 'F Personnel&,Safety/BOP Data Accident?(V/N): N Name: N/A Employer: N/A Rpt Filed?(Y/N): N/A PB Drlg: 1 Contractor: 30 Service: 14 Other: 0 Total: 45 Last BOPE Test: 12/1/91 Last BOP Drill: 12/5/91 Last H2S Drill: 12/4/91 Last Fire Drill: 12/6/91 Last Safety Mtg: 12/7/91 Last Spill Drill: 12/12/91 Spill(Y/N)? N Volume(Gals.): 0 Type Spill: N/A Report Filed? N/A Time Operation Proo Code Operations From 0600 to 0600 0600-0900 DRIL DRILL F/3060' TO 3518' ART=21/4 HRS 0900-1030 CIRC CIRC HOLE UNTIL CLEAN 1030-1430 TRIP POOH SLM, CLEAN STAB,RIH 1430-1500 --FRCP` CBU CA a-c- 1500-1700 TRIP DROP SS SURVEY,PUMP PILL, POOH FOR 10 314 CASING 1700-1800 OTHR L/D BHA 1800-1900 CASG WU TO RUN CASG 1900-2230 CASG RIH W/ 10 3/4 CASG. 2230-2330 CIRC CIRC&COND MUD FOR CMT JOB 2330-0230 CASG PUMP 100 BBLS H2O SPACER,TEST CMT LINES TO 3000 PSI,PUMP 415 BBLS AS-Ill LEAD CMT SLURRY, PUMP 72 BBLS CLASS'G' TAIL SLURRY, DISPLACE W/ RIG @ 12 TO 14BPM, BUMP PLUG W/ 2000 PSI,CK FLOATS, CIP @ 0230 HRS Prudhoe Bay Drilling Daily Drilling Report (IEE.No: 4J0124 pt.NO: 1 Date: 12/14/91 Well Name: DS 4-42 Supv. Init: L.P. Page 2 Mud Lod Data Depth Mud Wt, Formation BG gas Conn gas Trip gas pp4 U U U Max BGG Dc Exponent Shale density Est.pore press ROP/Shale ROP/Sand fph tph Time Operation, Prob Code Operations From 0600 to 0600 0230-0300 CASG RIG UP FOR TOP JOB 0300-0500 CASG PUMP 50 BBLS H2O, 58 BBLS AS-1 FOR TOP JOB, 15.0 SLURRY GOT 14.9 RETURNS 0500-0600 CASG R/D TOP JOB PIPE,WASH OUT CMT LINES,L/D LANDING JT,START TO N/D SURFACE BOPE ~ i Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. ~91r/~~ File Number of Well History File PAGES TO DELETE Complete RESCAN ^ Color items -Pages: ^ Grayscale, halftones, pictures, graphs, charts - Pages: ^ Poor Quality Original -Pages: ^ Other -Pages: DIGITAL DATA Diskettes, No. ^ Other, NorType OVERSIZED ^ Logs of various kinds o Other C~.~~\ ~ COMMENTS: ~ ~-/ ~ ~ ~~ Scanned b Beve~y Dunn Vincent n Lowell Date: ~j/ y ^ TO RE-SCAN Notes: Re-Scanned by: Beve~iy Dianna Vincent Nathan Lowell Date: ~~ MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday,June 04,2012 TO: Jim Regg P.I.Supervisor £f (l i (/v SUBJECT: Mechanical Integrity Tests l( BP EXPLORATION(ALASKA)INC 04-42 FROM: Bob Noble PRUDHOE BAY UNIT 04-42 Petroleum Inspector Src: Inspector Reviewed By,.;_. P.I.Supry NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 04-42 API Well Number 50-029-22229-00-00 Inspector Name: Bob Noble Permit Number: 191-143-0 Inspection Date: 5/17/2012 Insp Num: mitRCN120521185005 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 04-42 ' Type Inj W'TVD J 8032 . T—IA 485 2460 , 2419 j 2429 2437 2441 - PTD - 1911430 Type Test SPT Test psi I 2008 , OA 88 , 270 . 285 1 305 323 337 I -- Interval 4YRTST P/F P Tubing! 1977 ' 1911 1938 1859 1817 1804 Notes: Testing witnessed through 60 min Test determined to be"Pass"per J.Regg. 1NED LIAR 13 204 Monday,June 04,2012 Page 1 of 1 • • P 64 04 — 42 P Let ( r 4 Regg, James B (DOA) From: Regg, James B (DOA) Vee, 4036.7— 7 Sent: Friday, May 18, 2012 3:18 PM CI To: 'AK, D &C Well Integrity Coordinator; Brooks, Phoebe L (DOA) Cc: Noble, Robert C (DOA); Brooks, Phoebe L (DOA) Subject: RE: Injector 04 -42 (PTD #1911430) Inconclusive AOGCC MIT -IA Thank you for the additional info during our phone call this afternoon. You indicated that the well pressures were monitored through 75 minutes and IA only gained an additional 2 psi for a total gain of 6 psi during final 30 minutes of the MIT. Increasing IA was attributed to fluctuating injection temps during the test. The well exhibits sufficient stabilization for calling this a passing test. When you submit the test report at the end of the month, please include the 75min pressure data in the remarks of the form, along with a brief note about the fluctuating injection temps. Jim Regg AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 , Jura 1 t o 907 - 793 -1236 From: AK, D &C Well Integrity Coordinator [ mailto: AKDCWellIntegrityCoordinator (abp.com] Sent: Friday, May 18, 2012 11:52 AM To: Regg, James B (DOA); Brooks, Phoebe L (DOA) Subject: Injector 04 -42 (PTD #1911430) Inconclusive AOGCC MIT -IA Jim, An AOGCC witnessed MIT -IA was performed on Produced Water Injector 04 -42 (PTD #1911430) on 05/17/2012. Mr. Bob Noble was the AOGCC witness on location and deemed the test inconclusive pending further review due to the IA pressure increasing during the test. Currently the well remains on injection and I wanted to get an assessment on whether the MIT -IA should be repeated. MIT -IA form, TIO Plot, Injection Plot and wellbore schematic are attached for reference: «MIT PBU 04 -42 5- 17- 12.xls» «04 -42 TIO 05- 18- 12.doc» «04- 42.pdf» Thank you, Mehreen Vazir t:�ilc't' ;lute'. 4t_'f'if %Ce : \'1Zopi Well Integrity Coordinator BP Alaska Drilling & Wells Well Integrity Office: 907.659.5102 Email: AKDCWelllntegrityCoordinator @BP.com 1 • PBU 04-42 PTD # 1911430 5/18/2012 TIO Pressures Plot Welk 04-42 4000 31300 1 ' Tbp IA z000 00A —0-- 000A ••••••■ On 1030 - 02/18/12 02/25/12 03/03/12 03/10/12 03/17/12 03/24/12 03/31/12 04/07/12 04/14/12 04/21/12 04/28/12 05/05/12 05/12/12 Injection Plot Welk 04-42 28.000 26 000 24,000 22 000 20,000 1203- J - --- 1 OW co —WHIP 16,000 — 1031 - 14850 14,000 , - 12,000 — GI - oth. laom On 8,000 485- 61305 • 4,000 285- 2,000 1 0248112 02/25/12 03/03/12 03/10/12 03/17/12 03/24/12 03/31/12 " 04/07/12 04/14/12 0421/12 04/28/12 05105/12 05/12/12 1 • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submit to: jim.reaa alaska.gov; doa .aoacc.prudhoe.bavAalaska.gov; phoebe.brooks(rDalaska.aov; tom.maunderCcaalaska.00v OPERATOR: BP Exploration (Alaska), Inc. FIELD / UNIT / PAD: Prudhoe Bay /PBU /DS -04 DATE: 05/17/12 OPERATOR REP: Mehreen Vazir AOGCC REP: Bob Noble Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 04 -42 - Type Inj. W TVD ' 8,032' Tubing 1977 ' 1911 ' 1938 1859 1817 1804 Interval 4 P.T.D. 1911430 Type test P Test psi - 2008 Casing 485 - 2460 - 2419 - 2429 - 2437 ' 2441 - P/F Notes: 4 Year AOGCC MIT -IA OA 88 - 270 285 305 323 337 IA took 2.4 bbls to pressure up _ Well Type Inj. TVD Tubing Interval P.T.D. Type test , Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA TYPE INJ Codes TYPE TEST Codes INTERVAL Codes D = Drilling Waste M = Annulus Monitoring I = Initial Test G = Gas P = Standard Pressure Test 4 = Four Year Cycle I = Industrial Wastewater R = Internal Radioactive Tracer Survey V = Required by Variance N = Not Injecting A = Temperature Anomaly Survey T = Test during Workover W = Water D = Differential Temperature Test 0 = Other (describe in notes) Form 10 -426 (Revised 06/2010) MIT PBU 04 5 - 17 - 12 TREE = CIW • WELLHEAD =. FMC SAFAIPOTES: ACTUATOR = BAKER C 04-42 K4.0= ' ---: - 60 ' EiF. EL7 = — - - — I KOP = 5915' 6 1 1 niiii" 4-1/2" HES X NIP, ID = 3.813" 1 Max Angle' = 25 7473' 'Datum MD = 9092' / 2795' H ESTIMATED TOP OF CEMENT Datum TVD = 8800' SS L % . 120" CONDUCTOR, 91.5#, H-40, ID = 19.124" H 115' 10-3/4" CSG, 45.5#, L-80 BTC, ID = 9.950" 1 3503' 1 8190' 114-1/2" HES X NIP, ID = 3.813" 1 Minimum ID = 3.725" @ 8423' pia I.S I 8211' J---1 7-5/8" X 4-1/2" BKR S-3 PKR, ID = 3.870" 1 4-1/2" PARKER SWN NIPPLE • I 8235' 14-1/2" HES X NIP, ID = 3.813" 1 4-1/2" TBG, 12.6#, L-80 TCII, .0152 bpf, ID = 3.958" I H 8295' -..................... 8346' ---1BKR LOC / SEAL ASSY (15' STEM), ID =3.875"J 3.875"1 8298' 17-5/8" X 4-1/2" UNIQUE OVERSHOT 1 TBG STUB (04/26/08) H 8298' ..........„..,1 .................--- 8348' 1 BKR PBR w /K-22 ANCHOR, D = 4.50" 1 OrAl. 1 8365' —17-5/8" X 4-1/2" BKR SABL PKR, ID = 3.875" 1 -------- 8370' -18" MILLOUT EXTENSION, ID = 4.81" 1 .."-------- 8375' 15-1/2" X 4-1/2" X0, ID = 3.958" 1 1 8423' H 4-1/2" PKR SWN NIP, ID = 3.725" 8430' 117-5/8" BKR TIEBACK SLV, ID =? 1 1TOP OF 5-1/2" LNR 11 8430' 8436' 1-14-1/2" WLEG, ID = 3.958" 1 4-1/2" TBG, 12.6#, L-80 BTC-M, —I 8436' , 1 8437' _1- 7-5/8" X ?" BKR LNR TOP PKR .0152 bpf, ID = 3.958" 1 w / BKR HY FLO LNR HGR, ID = ? NI 1 8438' H ELMD LOGGED ON 03/01/92 1 8446' 117 X 5-1/2" X0, ID = ? 1 7-5/8" CSG, 29.7#, L-80 BTC, ID = 6.875" 1 8721' 116 1 1 PERFORATION SUMMARY 1 9009' H 5-1/2" MARKER JOINT 1 REF LOG: ATLAS DIL ON 12/26/81 ANGLE AT TOP PERF: 19° @ 8756' r it . . . . .., 9018' HEST TOP OF CMT (11/03/05) 1 Note: Refer to Production DB for historical perf data r A 114, SIZE SPF INTERVAL Opn/Sqz DATE 1111111111111111=11 9083'-9157' 1 SAND PLUG (11/03/05) 1 3-3/8" 6 8756 - 8786 0 12/03/09 II 3-3/8" 6 8814 - 8880 0 11/11/05 3-3/8" 14 9142 - 9148 C 01/20/92 3-3/8" 10 9145 - 9165 C 07/14/96 3-3/8" 10 9170 - 9190 C 07/14/96 I PBTD I 9246' more • vg * • • 1 5-1/2" LNR, 17#, L-80 FL4S, .0232 bpf, ID = 4.892" 1--1 9336' 0 * I • 0 At I 1 TD 1 9337' % • ••••• A DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/31/91 N28E ORIGINAL COMPLETION 10/22/08 PJC DRLG DRAFT CORRECTIONS WELL: F 04-42 04/30/08 N4ES RWO 12/11/09 JED/SV ADPERF (12/03/09) PERMIT No: F 1911430 07/21/05 MCJ/PJC OA DWN SQZ API No: 50-029-22229-00 11/03/05 JLG/TLH SAND PLUG & CMT CAP SEC 34, T11N, R15E, 455' FEL & 565' FNL 11/11/05 GJB/PJC A DPERFS 10/08/08 AW/JMD DRLG DRAFT CORRECTIONS BP Exploration (Alaska) i Schfu~berger Alaska Data & Consulting Services 2525 Gamball Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job M Log Description Date BL 03-37 09AKA0188 OH MWD/LWD EDIT - ! 02/74/10 2 1 07-238. V-123 04-42 09AKA0078 BBKA-00002 8148-00099 OH MWD/LWD EDIT CH EDIT PDC SCMT •~ .. INJECTION PROFILE 01/10/10 01/15/10 03/23!10 2 1 1 1 1 06-12A X-04 03-28 AP30.00081 BBSK-00012 89RH-00017 PRODUCTION PROFILE LDL ~ PRODUCTION LOG - 03/21/10 -03/14/70 03/19/10 1 1 1 1 1 1 14-11 A B3S0-00050 PERF RECORD & FL I G BHP ~ /20/10 1 1 15-318 AP30-00082 LDL .- 03/22/10 1 1 03-10 14-07 03-11 12-26 P2-22 P2-22 89RH-00018 8148.00098 B9RH-00019 ANHV-00121 BBSK-00011 BBSK-00011 INJEC ION PROFILE PERF RECORD & FLOWING BHP INJECTION PROFILE - PRODUCTION PROFILE t - USR CORROSION DATA - USIT CEMENT DATA ~ 03/21/10 03/22/10 03/22/10 03/16/10 03/11/10 03/11/10 1 1 1 1 1 1 1 1 1 1 1 1 03-28 .89RH-00017 CBL - J $ -03/19/10 1 1 15-30A B5JN-00045 SCMT - - 03/22/10 1 1 MPS-08 BBUO-00009 USIT 03/12/10 1 1 PLEASE ACKNnWLFnr:F wcc ator wv crr_unu r_ eun eerr ~ourur ...,~ ~...... ~.,.,. ~.._ BP Exploration (Alaska)Inc. Petrotechnical Data Center LR2-1 900 E. Benson Bivd. (~ ~( eti 'a 4 '- 03/25/10 ,.., ~~,A . NO. 5461 Company: State of Alaska q (~ ~~ ~a ~ (1 1' 11 Alaska Oil & Gas Cons Comm ! 1 I $ Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~^qj~ r< ~,~„ i 6 4 Color CD p Alaska Data & Consulting SeMces 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2936 • STATE OF ALASKA RECEIVED ED ALASKIRIL AND GAS CONSERVATION COMMIS DEC 1 Q 2009 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ quag & Gas 0(1S. OII M1S ion Performed: Alter Casing ❑ Pull Tubing F Perforate New Pool ❑ Waiver❑ Time Extension ❑ Anchorage Change Approved Program ❑ Operat. Shutdown ❑ Perforate Q Re -en er Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: S. Permit to Drill Number: Name: Development p ❑ Exploratory Ea 191 -1430 3. Address: P.O. Box 196612 Stratigraphic❑ Service E] N API Number: Anchorage, AK 99519 -6612 50- 029 - 22229 -00 -00 8. Property Designation (Lea s Number) : . Well Name and Number: ADLO- 028325 PBU 04 -42 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE BAY POOL 11. Present Well Condition Summary: Total Depth measure 933 feet Plugs (measured) 9018' feet true vertical 9090.5 feet Junk (measured) No ne feet Effective Depth measured 901 feet Packer (measured) 2179 8211 8365 true vertical 8791 feet (true vertical) 2178 8032 8176 Casing Length Size MD TVD Burst Collapse Structural Conductor 115 20" 91.5# H-40 SURFACE - 115 SURFACE - 115 1490 470 Surface 3503 10 -3/4" 45.5# L -80 SURFACE - 3503 SURFACE - 3503 5210 2480 Intermediate 8721 7/5/8" 29.7# L -80 SURFACE - 8721 SURFACE - 8511 6890 4790 Production Liner 906 5 -1/2" 17# L -80 8430 - 9336 8237 - 9090 7740 6280 Liner Perforation depth: Measured depth: SEE ATTACHED - True Vertical depth: _ _ _ Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 SURFACE - 8436' SURFACE - 8242' Packers and SSSV (type, measured and true vertical depth) 4 -1/2" AVA TRSV SSSV NIPPLE 2179 2178 4 -1/2" Baker Packer W /K -22 Anchor 8211 8032 4 -1/2" Baker SABL Permanent Packer 8365 8176 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 2009 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 25322 Subsequent to operation: 11374 14. Attachments: . Well Class after work: Copies of Logs and Surveys Run Exploratory[ Development ❑ Service 21 Daily Report of Well Operations X . Well Status after work: Oil Gas WDSPL GSTOR ❑ WAG ❑ GINJ ❑ WINJ Q SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Eng Signature Phone 564 -4944 Date 12/10/2009 Form 10 -404 Rew ed 7/2009 Submit Original Only 04-42 191 -143 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 04-42 1/18/92 PER 9,142. 9,148. 8,907.4 8,913.03 04-42 1/18/92 PER 9,150. 9,165. 8,914.91 8,929. 04-42 1/18/92 PER 9,171. 9,190. 8,934.64 8,952.48 04-42 7/14/96 APF 9,170. 9,190. 8,933.7 8,952.48 04-42 7/14/96 RPF 9,145. 9,165. 8,910.22 8,929. 04-42 10/28103 BPS 8,515. 8,535. 8,316.41 8,335.23 04-42 11/2/03 BPP 8,515. 8,535. 8,316.41 8,335.23 04-42 11/3/05 SPS 9,018. 9,190. 8,790.76 8,952.48 • 04-42 11/11/05 APF 8,814. 8,880. 8,598.52 8,660.76 04-42 11/7/06 BPS 8,487. 9,142. 8,290.08 8,907.4 04-42 11/17/06 BPP 8,487. 9,142. 8,290.08 8,907.4 04-42 4/16/08 BPS 8,261. 8,814. 8,078.57 8,598.52 04-42 4/29/08 BPP 8,261. 8,894. 8,078.57 8,598.52 04-42 5/2/08 BPP 8,261. 8,814. 8,078.57 8,598.52 04-42 12/3/09 APF 8,756. 8,766. 8,543.75 8,553.2 04-42 12/3/09 APF 8,766. 8,786. 8,553.2 8,572.08 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL I SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE • MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE 0 1 04 -42 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE I SUMMARY 12/2/2009 'WELL INJECTING ON ARRIVAL`'`* DRIFT TUBING W/ 3 -3/8" DUMMY PERF GUN, TEL, S.BAILER TO 8838' SLM ... (NO SAMPLE RECOVERED) TAG TT @ 8413' SLM +25' CORK. = 8438' ELMD...TAG TD @ 8838' SLM/8863' CORRECTED ELMD T /1 /0= 400/0/0 ***WELLS/[ ON DEPARTURE' 12/2/2009 * ** *WELL SHUT -IN ON ARRIVAL * * ** (E -LINE ADPERF) INITIAL T /1 /0= 550/0/0 ARRIVE, SPOT EQUIPMENT, SIGN PERMIT. WELL WAS FREEZE PROTECTED WITH 60/40 BY THE DSO PRIOR TO ARRIVAL. * ** *JOB CONTINUED ON 3- DEC - 2009 * * ** I 12/3/2009 * ** *JOB CONTINUED FROM 2- DEC - 2009 * * ** (E -LINE ADPERF). RIH WITH 20' GUN STRING: MAX OD = 3.375 ", OAL = 27'. PERFORATE 8766'-8786'W/ 3 -3/8" 3406 POWERJET HSD GUNS, 6 SPF. RIH W/ 10' GUN STRING, MAX OD: 3.375 ", OAL =17'. P E BEQfLAT F 87 6' W/ 3 -3/8" 3406 POW ERJET HSD GUNS, 6 SPF. W =C, SSV= O, M =O, CASING =OTG FINAL T /1 /0 =0/0/0 PSI ** *JOB COMPLETED. WELL SI UPON DEPARTURE * ** FLUIDS PUMPED BBLS 1 DIESEL 1 METH 2 Total TREE = C1W WR LHEAD� - FMC SAFETY 6k= BA 'K—GTUAf 04-42 KB. R EV = 60' BF. ELEV = r KOP = 5915'_ III Max Angle = 25' @ 7473' 1988, Datum MID = 9092' 2795' ESTIMATED TOP OF CEMENT Datum TVD= 8800' SS TM 120" CONDUCTOR, 91.5 #, H-40, ID 10-3/4" CSG, 45.5#, L-80 BTC, ID 3503' 44 - 1/2 " HE S — IP, - 1 0 817 1 Minimum ID = 3.725" @ 8423' 8211' -- �-5/ X4-�l/Z' BKR S-3PKRID- 4-112" PARKER SWN NIPPLE 8235' 14-1/2" TBG, 12.6#,L-80TCII,.0152 bpf, ID=3.958" 7-5/8" X 4-1/2" UNIQUE OVERSHOT] TBG STUB (04/26!08) $2g$' 8346' 1-fEK T LOC/ SEAL ASSY (15 STEM), ID = 3.875"1 8 -- BKR PBRw/K-22 ANCHOR, ID= =.50' -j7 X 4-1/2' — BKRSABL PKR, ID = 3,875" 8370' -1 6" MILLOUT EXTENSION, ID = 4.8E] 8375' F$42 4-11/2" PKIR SWN NIP, ID = 1725" TOP OF 5-1/ 8430' 7-5/8" BKR TIEBACK SLV, ID = ? 8436' 1 4-1/2" TBG, 12.6#, L-80 BTC-M 8436 8437 7-5/8" X ?" BKR LNR TOP PKIR .0152 bpf, ID = 3.958" 1 w / BKR HY FLO LNR HGR, ID = ? rEM ON 03/01/ ?'X 5-1/2" XO, ID = ? 7-5/8" CSG, 29.7#, L-80 BTC, ID L PERFORATION SUMMARY 5-1/2" MARKER JOINT REF LOG: ATLAS DIL ON 12/26/81 EST TOP OF CMT (11103105 ANGLE AT TOP PERF: 19 @ 8814' Note: Refer to Production DB for historical pert data � T9083'-91 57' SAND PLUG (11/03/05) SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 8814-8880 0 11 /11 /05 3-3/8" 14 9142-9148 C 01/20/92 3-3/8" 10 9145-9165 C 07/14/96 3-3/8" 10 9170-9190 C 07/14196 PBTD 9246' [- 5-1/2" LNR, 17#, L-80 FL4S, .0232 bpf, ID = 4.892" 9336' 9337' TD r B DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/31/91 N28E ORIGINAL COMPLETION 10/22/08 PJC DRLG DRAFT CORRECTIONS WELL: r 04-42 04/30/08 N4ES RWO PERMIT No: x 1911430 07/21/05 MCJ/PJC CA DWN SQZ API No: 50-029-22229-00 11/03/05 JLG/TLH SAND PLUG & CMT CAP SEC 34, T1 N. R1 5E, 455' FEL & 565' FNL 111/11/051 GJB/PJCIADPERFS 10/08/081 AWIJMD I DRLG DRA CORR BP Exploration (Alaska) MEM®RANDLTM ~ State ®f Alaska • Alaska Oii and Gas Conservation Commission DATE: Monday, June 02, 2008 TO: Jim Re / P.I. Supgrvisor ~ C~ l ~(~ 7/i~ ~ SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 04-42 FROM: Jeff Jones PRUDHOE BAY UNIT 04-42 Petroleum Inspector Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv >, Comm Well Name: PRUDHOE BAY UNIT 04-42 API Well Number: 50-029-22229-00-00 Inspector Name: Jeff Jones Insp Num• mitJJ080s31101008 Permit Number: 191-143-0 Inspection Date: s/30/2008 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. -- _ -- --- -?-- ~zso _ __ _ _ ---- 2260 ~ - --- -- - - - oa-a2 a In no 2300 -- -- r w - so3z IA _ Well I i9IIa3o TYP J• sPT I TVD -- -- - P.T. TypeTest i --~ Test psi -_-loos OA 6ao soo X90 sso - IDIIT ---- _- _ _ ---- ~ 8s0 -- -- -- , - -- ---- _ _ -~_ _ g Interval AL P/F P Tubin sso aso sso '____ _ NOteS• l.8 BBLS methanol pumped. 1 well house inspected; no exceptions noted. ~~~~~~ JUL ~ 2D~$ Monday, June 02, 2008 Page i of I STATE OF ALASKA ''~"~dp A~ OIL AND GAS CONSERVATION COM~ION JUN 1 1 ZOQS REPORT OF SUNDRY WELL OPERATIONgg Alaska Gil & Gas Cares. Cammissi0rl A....L.,» ren 1. Operations Performed: ^ Abandon ®Repair Well - ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Alter Casing ®Pull Tubing - ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ^ Development ^ Exploratory 191-143 ' 3. Address: ®Service , ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22229-00-00- 7. KB Elevation (ft): 60, 9. Well Name and Number: PBU 04~2- 8. Property Designation: 10. Field /Pool(s): _ ADL 028325 ~ Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 9337' ' feet true vertical 9091' feet Plugs (measured) 9018' Effective depth: measured 9018' feet Junk (measured) None true vertical 8791' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 115' 30" 115' 115' 1490 470 Surface 3503' 10-3/4" 3503' 3503' 5210 2480 Intermediate 8721' 7-5/8" 8721' 8511' 6890 4790 Production Liner 906' 5-1/2" 8430' - 9336' 8237' - 9090' 7740 6280 ~~~lNNE~ .IUN ~. 6 20D8 Perforation Depth MD (ft): 8814' - 9190' Perforation Depth TVD (ft): 8599' - 8952' 4-1/2", 12.6# L-80 8436' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 7-5/8" x 4-1/2" Baker S-3 packer ~y~,..--~~~211' 7-5/8" x 4-1/2" SABL Packer ~~~3 8365' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 6066 (Prod Wtr) 10 1923 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ^ Development ®Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ^ Oil ^ Gas ^ WAG ^ GINJ ®WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA ff C.O. Exempt: Contact Aras Worthington, 564-4102 308-133 Printed Name Sondra Stewman Title Drilling Technologist i . Prepared ey Name/Number: /~ Sig ature Phone 564-5743 Date( , ~~p ,~} Sondra Stewman 564-4750 Form 10-404~sed 04/200f-, _,~ Submit Original Only ~~ ~ ~ ~~~ ~ S ~F~ ~li~ 1 2006 ~~3 TREE = FMC GEN N WELLHEAD = FMC GEN N ACTUATOR = AXELSON KB. E1.EV = 60' BF. ELEV µr KOP = 5915' Max Angie = 25 ~ 7473' Datum MD = 9092' Datum TVD = 8800' SS DRLG DRAFT 10-3i4" CSG, 45.5#, L-80, ~ = 9.953" H 3503' 4-1/2" TBG, 12.6#, L-80, TGA .0152 bpf, ID = 3.958" 8201' Minimum ID = 3,725" ~ 8423' 4-1/2" PARKER SWN NIPPLE TOP OF 5-i /2" LNR ~ 8430' 4112" TBG-PC, 12.6#, L-80, .0152 bpf, ~ = 3.958" $436` 7-5t8° CSG, 2s.7#, L-80, ID = 6.87s" !- j 8721' PERFORATION SUMMARY REF LOG: ATLAS DfZ ON 12126/8 1 A NGLE A T TOP PERF: 19 ~ 8814' Note: Refer to Production DB for historical perf data SQE SPF ~RVAL OpnlSgz DATE 3-3/8" 6 8814 -8880 O 11 t11 /05 3-3t8" 14 9142 - 9148 C 01 !20/92 3-318" 10 9145 - 9165 C 07!14/96 3-3/8" 10 9170 - 9190 C 07/14!96 PBTD I-i 9246' 5-112" LNR, 17#, 1-80, .0232bpf, ID= 4.892" H 9336' ~~ 933T Q4-42 19$$" HES X Nipple ID = 3.813" 2795' ~) ESTMATED TOP OF CBbENT 8190' HES X Nipple ~ = 3.813" $211' 41P2" x 7 SJ8" Baker S-3 Poxlaer 8235' HES X Nipple ®= 3.813" $295' 4-1/7' x 75!8" Unique Overshot 8348' 4-1/2" BKR PBR W/K-22 A NCHOR, m = 4.500" 8365' 7-518" X 4-i/2"BKR SABL PERMANENT PKR, ~ = 3.880" 8423' 4-112" PKR SWN N~', ~ = 3.725" $434' 4-112" TSG TAE. WLEG, D = 3.960" 84$8' TT ELMD D3/01l92 9018' --1 EST TOP OF Guff (11 /031 9083 -8157' SAND PLUG (11103/05} DATE REV BY oirolrs2 oa3oros N4H5 Ff2UDKOE BAY UNIT WELL: X14-42 PERMIT No: ~ 911430 API No: 50-029-22229-00 SEG 34, T11 N, R15E, 1353.73' FEL 8 1494.OT FNL ~ 6tpbration (Alaska) Digital Well File • Page 1 of 2 • Well: 04-42 Well History Well Date Summary 04-42 4/14/2008 **** WELL SHUTIN ON ARRIVAL**** INITIAL WHP/IA/OA = 600/0/0 3.715" GUAGE RING PASS TO 8420' SET 4.5" FAS DRILL BRIDGE PLUG WITH MEAT 8400 FT. LRS PT PLUG, CMIT T X IA 2400PS1 04-42 4/14/2008 T/I/0= 880/180/0. Assist E-Line. CMIT-TxIA to 4000 psi (Pre RWO) Pumped 83 bbls of 60/40 Methanol down Tbg.*** WSR continues on 04/15/08*** 04-42 4/15/2008 ***WSR continues from 04/14/08*** Assist E-Line. CMIT-TxIA *FAILED* t 40. 00 osi.LLRT= 3 bpm ~ 2300 psi. Pumped an additional 138 bbls of 60/40 eo or a tota o 1 bbls. (TxIA volume to TTP). Pumped 69 bbls of 60/40 Meoh C~3 4 bpm to get to 3900 psi. Assist w/LDL by pumping 110 bbls of 60/40 Meoh into the TBG @ 1.5 bpm and 1600 psi. Assist w/LDL by pumping 171 bbls of 60/40 down TBG C~? 3 bpm and 2100 psi. and C~3 1.5 bpm and 1560 psi. to 2000 psi. Job canceled due to weather. FINAL WHP= 240/580/0. ANNULUS CASING VALVES TAGGED. ANFD LEFT OPEN ON DEPARTURE. E-Line still on well on departure. 04-42 4/15/2008 ***JOB CONTINUED FROM 14-APRIL-2008*** RU FOR E-LINE AFTER PLUG FAILING PT. LLR ESTABLISHED AT 3 BPM AND 2300 PSI. IA AND TUBING IN COMMUNICATION. EAK DETECTED AT 8385 FT BETWEEN PACKER AND PLUG. PLl1G DnFS N(~T APPEAR Tn RF I FAKING. ADDITI N 8205 AND POSSIBLY AT 5225 AND 5285 FT. UNABLE TO RIG DOWN DUE TO HIGH WINDS. ***CONTINUED 16-APR-2008*** 04-42 4/16/2008 T/I/O = 0/460/0. Temp= SI. Assist E-Line (RWO prep) CMIT-TxIA PASSED to 4000 osi. Pumped 9.3 bbls to achieve test pressure. TBG lost 20 psi & IA held / 1st 15 min. TBG & IA held / 2nd 15 min. TxIA lost 20 psi during the 30 minute test. Bled back -8 bbls to final WHP= 420/500/0. Annulus casing valves are open to gauges. 04-42 4/16/2008 T/I/0=0/0/0, Temp=Sl. Leaking gland nuts on casing head. 3 glandnuts (ET style) leaking on casing head. Functioned all LDS/gland nuts, all moved freely. LRS PT'd TBG x IA, leaks mitigated. 04-42 4/16/2008 *****CONTINUED FROM 15-APR-2008**** 4FT 6AK R 4 5" Qlll K DRI P 1 , AT 8 '~~+2 FT .MIT To noon Pst w~LRS. LEAK FOUND AT IA HANGER BOLTS, TIGHTENED. PLUG PASSES CMIT TO 4000 PSI. RIH WITH 3.65" JETCUTTER. ******CONTINUED 17-APR-2008****** 04-42 4/17/2008 T/I/0=0/0/0, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS). Pre RWO. PPPOT-T: Stung into test port to check pressure (200 psi), bled to 0 psi. Pumped through void until clean fluid was achieved. Pressured void to 5000 psi for 30 min test, lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Functioned LDS (ET style), all moved freely with no problems. PPPOT-IC: Stung into test port to check pressure (2000 psi), bled to 0 psi. Pumped through void until clean fluid was achieved. Pressured void to 3500 psi for 30 min test, lost 50 psi in 15 min, lost 0 psi in second 15 min (PASS). Functioned LDS, (ET style), all moved freely with no problems. 04-42 ~ 4/17/2008 ***CONTINUED FROM 16-APR-2008*** JET CUT 4-1/2" TUBING AT 8305 FT W/ 3.65" JET CUTTER .DEVIATION AT CUT 21 DEGREES. 350 5 LL - . ***JOB COMPLETE*** 04-42 4/18/2008 T/I/0=400/400/0 temp=s/i Circ-Out; MIT-OA (pre-rwo) Pumped pumped 9 bbl neat meth spear & 545 bbls 1 % KCL down TBG, up IA & down jumper line to wel #5. Pumped 105 bbls DSL down TBG for a FP of TxIA. Pumped 3 bbls DSL down jumper line to well #5 for FP. U-tubed TxIA. Pumped DSL down OA for MIT. ****Continued on 04-19-08 WSR*'** 04-42 4/19/2008 ****Continued from 04-18-08 WSR**** MIT-OA to 2000 psi ****FAIL**** (RWO prep) Pumped 3.9 bbls DSL down OA to bring pressure to 2000 psi. On 4th test OA lost 20 psi in 15 min, 40 psi in 2nd 15 min & 20 psi in 3rd 15 min. Fail. Bled OAP. ***Tags hung. Casing valves open to gauges.*** FWP=O/0/0 04-42 4/23/2008 T/I/0=0/0/0; Set 4-1/16" FMC ISA BPV thru tree for re-ri • No ext. used, tagged C~ 108'; ***Complete*** (Best/Wortham 04-42 4/24/2008 T/I/0=0/0/0; Pull 4-1/16" FMC ISA BPV thru tree for 4ES; no ext. used, tagged C~3 108" http://digitalwellfile.bpweb.bp.com/WIInfo/Reports/ReportViewer.aspx 6/10/2008 Digital Well File • • 04-42 4/25/2008 Attempted to Pull 5 1/8 IS-A BPV„ Made 3 run and sheered pulling tool pins each time. On fourth run pulling tool would not release from plug and called town. Pressure tested lower barrier to confirm 1 block in place and proceded to unbolt tree. Tree unbolted and we were able to get the pulling tool to release from the bpv. Bolted tree back up and rigged down lubricator. Taylor 04-42 4/26/2008 T/I/0=0/0/0; Attempt to Pull 4-1/16" FMC ISA BPV thru stack, sheared pins on pulling tool, BPV still in hanger; No further action from BPV crew. 04-42 4/29/2008 ***ASSIST RIG, NABORS 4ES*** (ball & rod, nc~) PULLED BALL & ROD @ 8190' MD. (8208' SLM) PULLED RHC @ 8190' MD. (8213' SLM) SET 4-1/2" RHC PLUG BODY C~ 8235' MD. (8261' SLM) RIG DROP BALL & ROD LRS MIT-T (PASS) ***TURN WELL OVER TO RIG*** 04-42 4/29/2008 T/I/0= BOP/210/100. Temp= SI. IA FL (Nabors rig call in). IA FL @ surface. 04-42 5/2/2008 T/I/0=0/0/0 Pulled 4 1/16" CIW H TWC #201 @108" post-rig 04-42 5/2/2008 ***WELL S/I ON ARRIVAL***(post rig) PULLED B & R, AND 4 1/2" RHC PLUG BODY FROM 8235' MD. DRIFT W/ 3.625 CENT, TEL, SAMP, SD C~3 8915' ELM (hard bottom) 35' OF RATHOLE. NO SAMPLE. ***WELL LEFT S/I OPER NOTIFIED*** 04-42 5/2/2008 ***WELL S/I ON ARRIVAL***(post rig) PULLED B & R, AND 4 1/2" RHC PLUG BODY FROM 8235' MD. DRIFT W/ 3.625 CENT, TEL, SAMP, SD ~ 8915' ELM (hard bottom) 35' OF RATHOLE. NO SAMPLE. ***WELL LEFT S/I OPER NOTIFIED*** 04-42 5/28/2008 T/I/0= 820/760/620. Temp= Hot. IA FL (pre-MITIA). IA FL @ surface. 04-42 5/30/2008 T/I/0= 850/710/640 Temp= HOT AOGCC MIT-IA PASSED to 2300 psi (Witnessed by J. Jones) Pressured up IA to 2300 psi with 1.8 bbls neat methanol. IA lost 40 psi in 1st 15 minsand 10 psi in 2nd 15 min for a total loss of 50 psi in 30 min test. Bled IAP to 620 psi. Bled back 1 bbl. FWHP's= 800/620/580 ***Annulus casing valves tagged and left open*`* Print Date: 6/10/2008 Page 1 of 1 http://digitalwellfile.bpweb.by.com/WIInfo/Reports/ReportViewer. aspx Page 2 of 2 6/10/2008 • BP EXPLORATION Operations Summary Report Page 1 of 4 Legal Well Name: 04-42 Common Well Name: 04-42 Spud Date: 12/12/1991 Event Name: WORKOVER Start: 4/23/2008 End: 4/30/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/30/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To ' Hours Task Code ICI NPT 4/24/2008 06:00 - 08:00 2.00 RIGD P 08:00 - 09:00 1.00 MOB P 09:00 - 12:00 3.00 RIGU P 12:00 - 13:00 1.00 KILL P 13:00 - 14:30 1.50 KILL P 14:30 - 16:00 I 1.501 KILL I P 16:00 - 17:00 1.00 WHSUR P 17:00 - 18:00 1.00 WHSUR P 18:00 - 19:30 1.50 WHSUR N SFAL 19:30 - 22:30 3.00 WHSUR N SFAL 22:30 - 23:00 23:00 - 23:30 23:30 - 00:00 4/25/2008 00:00 - 01:00 01:00 - 01:30 01:30 - 07:30 07:30 - 10:30 10:30 - 13:00 13:00 - 17:30 0.501 WHSURIN 0.501 WHSUR N 0.50 WHSUR N 1.00 WHSUR N 0.501 WHSURIN 6.001 WHSURIN 3.001 WHSUR I P 2.50 BOPSU~P 4.50 BOPSU P Phase Description of Operations PRE PJSM. Scope down and lay over derrick, rig down rig components. PRE Move rig and rig components from 04-17 to 04-42. PRE PJSM. Spot rig sub, pipe shed and pit module. Accept riq C~ 12:00 hrs, 04-24-2008. DECOMP PJSM. Rig up lines to tree valves and test ~ 3500 psi, OK. Take on heated seawater to the pits. DECOMP PJSM. Pick up lubricator, pressure test to 500 psi, OK. Pull BPV check ressures. Sheared pins on retrieving tool (2) times before successfully retrieving BPV. Tbg, I/A and O/A all reading zero pressure. DECOMP PJSM. Circulate the well bore to heated seawater ~ 5 1/2 bpm / 300 psi to clean returns. Returns fairly dirty. Pumped 350 bbls total. DECOMP Wait on FMC serviceman DECOMP P/U T-bar & install BPV in hanaer. Pressure up & attempt to test plug, Plug leaking. No test. DECOMP Wait on DSM to pull BPV. DECOMP P/U lubricator, M/U BPV retrieving tool & test to 500 psi. RIH & attempt to pull BPV would not come free sheared out w/ 1800 psi. POOH & re-dress tool. PT lubricator to 500 psi. RIH & attempt to pull BPV. Sheared again C~ 1800 psi hydraulic pressure w/ no success. POOH & re-dress tool to pull BPV. PT lubricator to 500 psi. RIH & attempt to pull BPV. No success. SFAL DECOMP Discuss options w/ town engineers & W/O supt. Plan to test Quikdril plug @ 8352' to 1000 psi for 10 min & chart test, then request dispensation for 1 plug w/ kill wt. fluid above plug to N/D tree & get lubricator polish rod free. SFAL DECOMP R/U & pressure test Quikdril plug to 1000 psi for 10 min. Good test. Charted same. Checked lubricator pressure w/ gauge. Notified S. Rossberg of test & received verbal dispensation to split tree & get lubricator free. SFAL DECOMP R/U to split tree & disconnect running tool from lubricator. SFAL DECOMP Split tree @ master valve. P/U & started to break connection on polish rod...retrieving tool came free from BPV. Retract polish rod & install new ring gasket. Inspect BPV. BPV appeared to be wedged in hanger & not properly seated. Orient nge & pull lubricator up thru rig floor. Inspected retrieving tool & could not see any damage to tool. SFAL DECOMP R/U & fill tree. Pressure test to 1000 psi for 10 min & charted test. Test good. SFAL DECOMP Wait on orders. Replace brake bands on drawworks. Maintain & service rig. DECOMP PJSM. Nipple down tree and adapter flange. Inspect BPV. Very slightly cocked to one side. Not seated all the way down. Photos sent to town. Threads on hanger are good. Placed socket over sleeve on BPV, making contact with BPV body, and, using hammer, encouraged BPV to go on seat. Install blanking plug. DECOMP PJSM. N/U 13 5/8" x 5M BOPE. DECOMP PJSM. Rig up test equipment and test ROPE as per AOGCC Printed: 6/10/2008 11:11:33 AM • BP EXPLORATION Operations Summary Report Legal Well Name: 04-42 Page 2 of 4 Common W Event Nam Contractor Rig Name: Date , ell Name: 0 e: Name: From - To ' 4-42 WORKO NABORS NABORS Hours VER ALASK 4ES Task. ~ A DRI Code LLING NPT Start I Rig Rig .Phase Spud Date: 12/12/1991 : 4/23/2008 End: 4/30/2008 Release: 4/30/2008 Number: Description of Operations 4/25/2008 13:00 - 17:30 4.50 BOPSU P DECOMP and BP requirements. Test rams and choke valves, HCR and manual valves on mud cross to 250 / 4000 psi. Test annular preventor to 250 / 3500 psi. Test kelly valves ~ 250 / 4000 psi. Perform drawdown test on accumulator. Witnessing of test waived by AOGCC inspector Chuck Scheve. 17:30 - 18:00 0.50 BOPSU P DECOMP R/D test equip. Clear floor. Drain BOP stack. Pull ISA Blanking plug. 18:00 - 19:00 1.00 WHSUR P DECOMP P/U & M/U lubricator. Attempt to pull BPV. No success. Retrieving tool sheared. UD lubricator. 19:00 - 20:00 1.00 WHSUR P DECOMP R/U & pump tubing volume. 3 BPM ~ 300 psi, increase to 5 BPM C~ 780 psi. Pumped 129 bbls. 20:00 - 21:00 1.00 PULL P DECOMP M/U landing jt. BOLDS. Pull hanger to floor. Came free w/ 102K. 21:00 - 22:00 1.00 PULL P DECOMP UD landing jt & check for pressure. Break out & disconnect control lines. UD hanger. 22:00 - 23:00 1.00 PULL P DECOMP R/U spooler. Circulate bottoms up 6 BPM ~ 380 psi. 23:00 - 00:00 1.00 PULL P DECOMP POOH & L/D 4 1 m I Spool up dual non encapsulated SS control lines. POOH & UD 24 jts. 4/26/2008 00:00 - 01:00 1.00 PULL P DECOMP Con't to POOH & L/D 4 1/2" completion. Spool up dual non encapsulated SS control lines. Recovered 53 jts 4 1/2" tubing + 1 SSSV Assy + 57 SS bands. 01:00 - 01:30 0.50 PULL P DECOMP R/D spooling unit. Clear floor. 01:30 - 06:00 4.50 PULL P DECOMP Con't to POOH & L/D 4 1/2 completion. Found thumb sized hole in jt # 126 & now seeing corrosion on pins. 06:00 - 06:30 0.50 PULL P DECOMP Crew change, check crown o matic, PVT system, OK. Conduct daily derrick inspection. 06:30 - 08:30 2.00 PULL P DECOMP PJSM. Continue to POOH w/ 4 1/2" BTC-M tubing. 201 jts total plus cutoff jt, 11.78' long. OD of flare on cut is 4.9". On a scale of 1 - 10, this jet cut recieves a 9 for uniformity and neatness. 08:30 - 09:30 1.00 PULL P DECOMP Clear /clean rig floor. Prep to pull pack off. 09:30 - 12:30 3.00 PULL P DECOMP Make up pack off retrieving tool on a joint of DP. Engage pack off, pull to 25K and pack off came free. Install new pack off and test to 3500 si OK. Install wear bushing. 12:30 - 14:00 1.50 CLEAN P DECOMP M/U 4 1/2" tubing dress off BHA. 14:00 - 18:00 4.00 CLEAN P DECOMP PJSM. RIH w/ 4 1/2" dress off BHA on 3 1/2" DP. RIH w/ 126 jts. 18:00 - 18:30 0.50 CLEAN P DECOMP Crew change. Inspect derrick. Check PVT alarms. Service rig. 18:30 - 21:30 3.00 CLEAN P DECOMP Con't to P/U 3 1/2" DP & RIHw/ BHA #1. RIH w/ 259 jts. Made. 4 asses w/ 7 5/8" casin scra er C~3 8230' Packer de th . 21:30 - 22:30 1.00 CLEAN P DECOMP P/U kelly establish mill parameters. Tag up on tubing stub ~ 8 '. Rotate & dress off top of tubing flare w/ shoe. Con't in & swallow 11' & dress off 1' tubing stub w/ inner mill. Top of dressed tubin stub C~3 8298' 4es RTKB. Made several passes over stub w/o circulation or rotation...no problems. P/U Wt = 133K, S/O wt = 128K, Rot Wt = 128K. Free torque = 1800 ft-Ibs. Pumped 5 BPM @ 1000 psi. WOB 2-5K, RPMs 65-80 22:30 - 00:00 1.50 CLEAN P DECOMP Mix & pump 40 bbl Hi-Vis sweep. 6 BPM C~3 1450 psi. recovered Smoo in returns. Pumped total of 360 bbls. 4/27/2008 00:00 - 00:30 0.50 CLEAN P DECOMP Finish pumping sweep. 6 BPM C~3 1450 psi. Blow down lines. Set back kelly. 00:30 - 04:00 3.50 CLEAN P DECOMP L/D single. POOH & stand back 86 stands of 3 1/2" DP. 04:00 - 05:00 1.00 CLEAN P DECOMP Break out & L/D BHA #1. Inspect mill, shows some indication Printed: 6/10/2008 11:11:33 AM BP EXPLORATION Page 3 of 4 Operations Summary Report Legal Well Name: 04-42 Common Well Name: 04-42 Spud Date: 12/12/1991 Event Name: WORKOVER Start: 4/23/2008 End: 4/30/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/30/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To Hours Task Code NPT ' Phase Description of Operations 4/27/2008 04:00 - 05:00 1.00 CLEAN P DECOMP of wear from tubing stub. 05:00 - 06:00 1.00 CLEAN P DECOMP Empty Boot Baskets. Clear & clean rig floor. Recovered 1/2 gal of Smoo w/some metal shavings. 06:00 - 06:30 0.50 CLEAN P DECOMP Service rig. Check crown o matic, PVT system, daily inspection on derrick. 06:30 - 08:30 2.00 CLEAN P DECOMP PJSM. M/U Baker Quik Drill and Fas Drill plug milling BHA. 08:30 - 13:00 4.50 CLEAN P DECOMP RIH w/ milling B A on 3 2 13:00 - 18:30 5.50 CLEAN P DECOMP PJSM. Observe shear guide shear w/ 84 stands in, (2) singles and 6', 12K shear, continue in and tag Baker Quik Drill plug ~ 8349' DPM, (85 stands and 24'). Establish parameters. 126K up wt, 123K down wt, 130K rotating wt. Engage rotary table, 1500 ft/Ibs off bottom torque, pumping 3 bpm ~ 350 psi. Rotate C~ 75 - 80 RPM, milling w/ 3 - 5K WOB. 18:30 - 19:00 0.50 CLEAN P DECOMP Set back kelly. P/U singles &RIH. Tag up on lower Fas-dril I u ~ 8394'. 19:00 - 19:30 0.50 CLEAN P DECOMP P/U kelly. Break circulation & drill up Fas-dril plug from 8394 to 8396'. P/U Wt = 126K, S/O Wt = 123K, Rot Wt = 129K. Pump 2 BPM @ 150 psi. Free Torq = 1500 ft-Ibs. WOB 3-5K. RPMs 65-120. Fluid level dropped. 19:30 - 20:00 0.50 CLEAN P DECOMP Set back kelly. P/U singles & chase pluo out bottom of tail oioe. Chased to 8451'. Tubing tail ~ 8436'. 20:00 - 20:30 0.50 CLEAN P DECOMP Monitor well. Fluid level falling slowly. Srvice rig. Check PVT alarms. Inspect derrick. 20:30 - 00:00 3.50 CLEAN P DECOMP ,POOH & UD 3 1 /2" DP. UD 125 jts. 4/28/2008 00:00 - 01:30 1.50 CLEAN P DECOMP Con't to POOH & UD 3 1/2" DP. UD 180 jts. 01:30 - 02:30 1.00 CLEAN P DECOMP Hold Weekly safety meeting w/all hands. Reviewed recent events. Watch EMS video. Heater incident & this weeks STOP cards. 02:30 - 05:00 2.50 CLEAN P DECOMP Con't to POOH & UD 3 1/2" DP. UD total of 259 jts. 05:00 - 06:00 1.00 CLEAN P DECOMP Break out & UD BHA #2. 06:00 - 06:30 0.50 CLEAN P DECOMP Service rig, check crown o matic, PVT system, daily inspection of derrick, OK. 06:30 - 07:00 0.50 CLEAN P DECOMP Continue to lay down BHA. 07:00 - 08:30 1.50 BUNCO RUNCMP Clear /clean rig floor. Prep to run completion string. Pull wear bushing. 08:30 - 18:00 9.50 BUNCO RUNCMP PJSM. Make up completion jewelry, Baker Locking everything below the packer &RIH on 4 1/2", 12.6# L-80 TCII tubing, torque turning each connection to 3850 ft/Ibs of torque, using Jet Lube Seal guard on each connection. RIH w/ 152 jts. 18:00 - 18:30 0.50 BUNCO RUNCMP Crew change. Service rig. Inspect derrick. Check PVT alarms. 18:30 - 21:00 2.50 BUNCO RUNCMP Con't to RIH w/ 4 1/2" 12.6#, L-80, TCII completion.Torque turn all connections to 3850 ft-Ibs. Use Jet Lube Seal Guard thread compound on all connections. RIH w/ 199 jts. 21:00 - 22:00 1.00 BUNCO RUNCMP P/U jt 200 & 201. Sheared out pins & bottomed out 19' in on jt #201 C~? 8313'. P/U 2' & space out. UD jt # 201 & 200. Bury 9.78', 9.76', 9.79' & 3.81' pups below jt # 199. Bottom of Overshot C~3 83 ' 22:00 - 23:00 1.00 BUNCO RUNCMP P/U & M/U tubing hanger. M/U on landing jt. RIH & land 4 1/2" completion. RILDS. Pull & UD landing jt. 23:00 - 00:00 1.00 BUNCO RUNCMP R/D Torque Turn equip. Clear & clean rig floor. 4/29/2008 00:00 - 02:00 2.00 BUNCO RUNCMP R/U to circulate down IA. Pump 200 bbls of heated Inhibited brine down annulus. Pumped 3 BPM ~ 250psi. 02:00 - 04:30 2.50 BUNCO RUNCMP R/U Hot oilers & test lines to 4000 psi. Pump 60 bbls of diesel Printed: 6/10/2008 11:11:33 AM ~~ ,' BP EXPLORATION Page 4 of 4 Operations Summary Report Legal Well Name: 04-42 Common Well Name: 04-42 Spud Date: 12/12/1991 Event Name: WORKOVER Start: 4/23/2008 End: 4/30/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/30/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To I~, Hours Task ', Code ! NPT I, Phase Description of Operations 4/29/2008 02:00 - 04:30 2.50 BUNCO RUNCMP freeze protectdown IA. Pumped 2 BPM ~ 800 psi. Swap lines, Pressure test & pump down tubing & freeze protect w/ 30 bbls of diesel. Pump 1.5 BPM ~ 1400 psi. R/U & allow well to U-tube. 04:30 - 06:00 1.50 BUNCO RUNCMP Drop Rod/ ball & allow to fall on seat. Ptressure up to 2600 psi & set packer, con't to Pressure up to 4000 psi & test to ing or 30 min. 06:00 - 09:00 3.00 BUNCO RUNCMP PJSM, Bleed tubing to 1500 psi, attempt to pressure up I/A x 09:00 - 13:00 4.00 BUNCO DPRB RUNCMP 13:00 - 15:00 2.00 BUNCO DPRB RUNCMP 15:00 - 17:00 2.00 BUNCO DPRB RUNCMP 17:00 - 20:30 3.50 BUNCO DPRB RUNCMP 20:30 - 23:00 ~ 2.50 ~ RU 23:00 - 00:00 I 1.001 WHSUR I P 4/30/2008 100:00 - 02:00 I 2.001 RUN 02:00 - 04:30 2.50 BOPSUF~ P 04:30 - 06:00 1.50 WHSUB P bled back 6 bbls. Repressure tubing to 4200 psi / 10 minutes. Bled tubing and pumped down I/A taking returns up tubing. Consult with Little Red. Little Red pressures up tubing to 4500 psi, we use Nabors test pump to pressure up to 5000 psi, hold for 10 minutes. Bleed off pressure and line up and circulate down the I/A taking returns up the tubing. Little Red standing by. Nipple down flow nipple, nipple up shooting flange and rig up Schlumberger slick line unit to locate and pull ball /rod assembly and RHC-M plug. P/T lubricator to 500-psi. Zeroed slickline depth indicator at rotary table. RIH w/ball and rod retrieval tool. Tagged at 8208' SLM. POH w/ball and rod. No visible damage on ball and the rest of ball and rod assembly are O.K. Bait slickline tool string with GS pulling tool to retrieve RHC sleeve. RIH w/GS tool and tag at 8212' SLM. Jar RHC sleeve free and POH. Did not see RHC sleeve pass through X nipple at 8190'. Noted RHC sleeve passing through X nipple at 1987' (1977' SLM) with 600 lbs. overpull. Redress RHC sleeve and RIH to set in X nipple below packer DPRB RUNCMP Dro rod/ball & allow Pressure test lines to diesel. Close rams & acker, con't to res~ to 4000 psi for 30 mir Hot oiler lines to IA & on seat. R/U Hot oiler & lines psi. Top off tubing & annulus w/ ure up tubing to 2600 psi & set_ ~ to 4000psi & SI tubing. Test tubinc Bled tubing to 1500 psi & SI. Swap ure test. Pressure up on IA to 4000 0 osi. Bled off annulus & tubing to RUNCMP M/U TWC on t-bar & install in tubing hanger. Pressure test TWC to 1000 psi for 10 min. Charted test. Test OK. RUNCMP R/D slickline equip. R/D Hot Oiler & Blow down lines to cellar. N/D Shooting flange. R/U air boot. RUNCMP N/D BOPE. Set back stack. RUNCMP N/U adapter flange & X-mas tree. Test adapter flange & tree to 5000 psi for 15 min each. Left well with TWC installed in tubing hanger. ,Released rig at 06:00-hrs. Printed: 6/10/2008 11:11:33 AM 05/01 /08 ~chlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Woll .Inh # NO. 4686 Company: State of Alaska Alaska Oil & Gas Cons Comm h {~ Attn: Christine Mahnken ~c~~;~R~E~ MAY ,~ ~ 2~~$ 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Inn nccrriniinn n~fiu RI Cnlnr rtn L5-24 11975769 PRODUCTION PROFILE W/FSI s 04/29/08 1 1 W-22 12066521 PRODUCTION PROFILE W/FSI 04/14/08 1 1 05-34 11962597 DDL - / 04116!08 1 1 S-33 11962596 SFRT 04/15/08 1 1 B-06 11999002 SCMT 04/19/08 1 1 04-42 11966253 LDL 04/15/08 1 1 D-10 11975766 PRODUCTION PROFILE j _ U (~ 04/24/08 1 1 PLEASE AGKNUWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. - Petrotechnical Data Center LR2-1 " 900 E. Benson Blvd. Anchorage, Alaska 99508 s ~r l 't~lt~.,,.~ 1 ~ ~~ ~ y~ Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 0 Anchorage, AK 99503-283 p_...~ ATTN: Beth Received by: I;-~ s -, ~ ~ - _ ~ !~ i k y~ ` i (f b I` ' ~ ~ ~ SARAH PALIN, GOVERNOR .. .,..,,.,.,,b ,...__ d . i 1 ~,. v ° :, LaisC~~7I~AA Ol[L A1~TlD GA5 333 W. 7th AVENUE, SUITE 100 CO1~T5ERQA7`IOrT COMMI55IOI~T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 David Reem Engineering Team Leader BP Exploration Alaska, Inc. PO Box 196612 ~ ASR ~ ~~~~ Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 04-42 ~ ~ ~~ Sundry Number: 308-133 ~~~ Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. ~t_ / ~ Chair DATED this `?-~d-a'y` of April, 2008 Encl. STATE OF ALASKA ~ ~~I~~~~ -~" '` ~ ALASKA OIL AND GAS CONSERVATION COMMISSION ~ ~~~ - ~~ APPLICATION FOR SUNDRY APPROVAL on nnr~ o~ inn ~CE1V~D APR ~ 0 2008 ~.. na o n_. n,..,., r~....~..,,:ncinn !1 V< V4V YV~~ ' 1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time ExtetOf89Q ^ Alter Casing ®Repair Wetl ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ®PuII Tubing ^ Perforate New Poot ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ^ Development ^ Ex lorato 191-143 3. Address: p ry ®Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22229-00-00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? ^ Yes ®No PBU 04-42 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): ADL 028325 '' 60' - Prudhoe Bay Field / Prudhoe Bay Pool 12' PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 9337' 9091' ~ 9018' 8791' 9018' None asin Len th ize MD TVD Burst Colla se ru ural n r 115' 0" 11 115' 1490 47 rface 3503' 10-3/4" 3503' 3503' 5210 2480 In ermediate 8721' 7-5/8" 8721' 8511' 6890 4790 P d ci Liner 906' S-1/2" 8430' - 336' 8237' - 9090' 7740 6280 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 8814' - 9190' 8599' - 8952' 4-1/2", 12.6# L-80 8436' Packers and SSSV Type: 7-518" x 4-1/2" Baker'SABL' packer Packers and SSSV MD (ft): 8365' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Detailed Operations Program ^ Exploratory ^ Development ®Service 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: May 2008 ^ Oil ^ Gas ^ Plugged ^ Abandoned 17. Verbal Approval: Date: Commission Representative: ^ WAG ^ GINJ ®WINJ ^ WDSPL 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Aras Worthington, 564-4102 Printed Nam avid Reem _ Title Engineering Team Leader Prepared By Name/Number: Signature Phone 564-5743 Date y ~~ O~ Terrie Hubble, 564-4628 Commission Use Onl Sundry Number: Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity I~OP Test Mechanical Integrity Test ^ Location Clearance Other: ~(~ (~~ ~S t ~~ ~~~ Subsequent For quired: 4-.t~ APPROVED BY ~ /- /~ A roved B T MMISSIONER HE C MISSION Date Form 10-403 Re a 06/2006 ~~,/hC ~ j (~" ~~,~ Submit In Duplicate ORIGI r!J ~~--~~~o~ NAL r bP cr,,~~. 04-42i Rig Workover Scope of Work: Cut & Pull 5-112" L-80 completion, change out 9-5/8" casing packoffs, Run new 4-1/2" L- ~ 80 completion. MASP: 2600 psi Well Type: Injector Estimated Start Date: May, 2008 Pre-ria prep work: O 1 Check the tubing hanger and IC casing hanger lock down screws for free movement. Completely back out and check each lock down screw for breakage (check one at a time). PPPOT-T & IC. E 2 Set 4-1/2" Fasdril in middle of the first full joint below the packer at 8400' (Ref: 12/29/91) tubin summa F 3 CMIT TxIA to 4000 si. E 4 Jet cut @ 8305', 10' from the top of 1 S full joint above the packer (Ref: 12!29191 tubing summa F 5 Circulate/bullhead seawater thru the cut. Bleed WHP's to 0 si. W 6 Set BPV O 7 Remove the wellhouse & flow line. Level the ad as needed for the ri . Proposed Procedure: 1. MIRU Nabors 4es. Circulate out freeze protection fluid with sea water through the cut. ND tree. NU and test BOPE to 250 psi low, 3500 psi high. 2. Pull and LD 4-1/2" tubing string. 3. Change out 9-5/8" Casing packoffs through the stack. 4. Run new 4-1/2" L-80 premium threaded tubing stacker packer completion with packer at 8215' MD. 5. Displace the IA to packer fluid and set the packer. 6. Test Tubing & IA to 4000 psi. Freeze protect to 2200' MD. 7. Set TWC. ND BOPE~U and test tree. Pull TWC and Set BPV. RDMO. FMC GEN N = FMC GEN N R = AXELSON . l=LtJ = ~ 60' '~ " al=: REV KOP _ 5915' Max Angie = 25 @ 7473' Datum MD = 9092' Datum ND = 8800' SS 10-3/4" CSG, 45.5#, L-80, ID = 9.953" I 3503' I Minimum ID = 3.725" @ 8423' 4-112" PARKER SWN NIPPLE TOP OF 5-112" LNR I 8430' 4-1/2" TBG-PC, 12.6#, L-80, .0152 bpf, ID = 3.958" 8436' 7-5/8" CSG, 29.7#, L-80, ID = 6.875" I-~ 872'1' PERFORATION SUMMARY REF LOG: ATLAS DIL ON 12/26/8 1 ANGLE AT TOP PERF: 19 @ 8814 ' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 8814 - 8880 O 11/11/05 3-318" 14 9142 - 9148 C 01 /20/92 3-3/8" 10 9145 - 9185 C 07!14/96 3-3/8" 10 9170 - 9190 C 07/14/96 PBTD I-I 9246' 5-112" LNR, 17#, L-80, .0232bpf, ID = 4.892" ~ 9336' TD 9337' 0 4 42 SAFETY NOTES: ***RAPID T X IA ZrOMM. OPERATING e LIMITS: MAX IAP = 2000 PSI; MAX OAP =,1000 PSI (11/12/05 WAIVERED)*** 2179' 4-112" AVA TRSV SSSV NIP, ID = 3.810" 2795' ESTIMATED TOP OF CEMENT 8346' 4-1/2" LOC SEAL ASSY, ID = 3.880" 8348' 4-1/2" BKR PBR W/K-22 ANCHOR, ID = 4.500" 8365' 7-5/8" X 4-1/2"BKR SABL PERMANENT PKR, ID = 3.880" 8423' 4-1/2" PKR SWN NIP, ID = 3.725" 8434' -~ 4-1 /2" TBG TAIL W LEG, ID = 3.960" 8438' TT ELMD 03!01/92 9018' -~ EST TOP OF CMT (11 /03/05) 9083'-9157' -rSAND PLUG (11/03/05) DATE REV BY COMMENTS DATE 01101192 ORIGINAL COMPLETION 11/07106 RRD/TLH iBPSET 06/12/01 RN/TLH CORRECTIONS 11/17/06 CJN/PAG PULL BKR IBP@ 8500' 07/21/05 MCJ/PJC OA DWN SQZ 11/03/05 JLGlTLH SAND PLUG & CMT CAP 11/11/05 GJB/PJC ADPERFS 11/12/05 EZLIPJC WANER SAFETY NOTE PRUDHOE BAY UNfT WELL: X0442 PERMff No: 1911430 API No: 50-029-22229-00 SEC 34, T11 N, R15E, 1353.73' Fla & 1494.07' FNL BP Exploration (Alaska) AX L ON 04-42 Proposed 60' = 5915' .8x Angle = 25 ~ 7473' app' HES X Ni l 8 = 3 " ~etum MD = 9092' pp . e ID 13 Datum TVD = 8800' SS 2796' ESTIMATED TOP OF CEMENT 10-3/4" CSG, 45.5#, L-$0, tD = 9.953" f - j 351)3' 4-1/2" TBG, 12.8#, L-80, TG11.0152 bpf, ID= 3.958" Minimum ID = 3.725" ~ 8423' 4-1 /2" PARKER SWN NIPPLE ~ TOP OF 5-1/2" LNR 4-1/2" TBG-PC, 12.8#, L-80, .0152 bpf, ID = 3.958" -~ H HES X Nipple ID = 3.813" 4112" x 75/8" S3 Packer HES X Nipple ID = 3.813" 4-112" x 75/8" Unique Overshot 8348' 4-1I2" BKR PBR W/K-22 ANCHOR, ID = 4.500" 8365' 7-518" X 4-1/2"BKR SABL PERMANENT PKR, 10 = 3.880" 8423' 4-1/2" PKR SWN NIP, ID = 3.725" 8434' 4-1/2" TBG TA IL WLEG, ID = 3.880" 8438' TT ELMD 03/01/92 29.7#, L-80, ID = 6.875" PERFORATION SUMMARY REF LOG: ATLAS DIL ON 12/28/8 1 ANGLE AT TOP PERF: 19 @8814' Note: Refer to Production OB for historical pert data SQE SPF INTERVAL OpNSgz DATE 3-3/8" 6 8814 -8880 O 11 /11!05 3-3/B" 14 9142 - 9148 C 01120/92 3-3/8" 10 9145 - 9165 C 07/14/96 3-318" 10 9170 - 9190 C 07/14/96 9018' --~T TOP OF CMT (11 /03/05) 9083'-9167' SAND PLUG (11 /03/05) PBTD H 9248' 5-1/2" LNR, 17#, L-80, .0232bpf, ID= 4.892" ~ 9336' ~, 9337 DATE REV BY COMNEPfTS DATE PRUDHOE BAY UNIT 01!01/92 ORIGINAL COMPLETION 11/07/06 RRDrTLH IBPSET WELL: b4-42 08/12/01 RN(fLH CORRECTIONS 11/17/06 CJWPAG PULL BKR IBP ~ 8500' PFJZMT No: 1911430 07/21/05 MCJ/PJC OA DWN SQZ API No: 50-029-22229-00 11/03ro5 JLG/Tl.H SAND PLUG 8 CMT CAP SEC 34, 711 N, R15E, 1353.73' FEL 81494.07 FNL 11/11!05 GJB/PJC ADPERFS 11/12/05 QUPJC WANER SAFETY NOTE BP Exploration (Alaska) • BP Exploration (Alaska} Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 November 09, 2007 • by ~~~;+~,' V G. NOV ~ ~ 2007 Mr. John Norman, Chairman Alaska Qi~ 8~ Gas Cons- ~®nnrr-'s~'nn Anchors~ge Alaska Oil & Gas Conservation Commission 333 W. 7t~ Ave. ~.~~> ND~ ~ 3 207 Anchorage, Alaska 99501 Subject: Prudhoe Bay Unit well 04-42 (PTD #1911430) Application for Cancellation of Sundry #302-059 Dear Mr. Norman: This request is to cancel Sundry #302-059 for Prudhoe Bay Unit well 04-42 (PTD #1911430). The Sundry, originally issued February 19, 2002, was for continued water injection with tubing by inner annulus communication. The well no longer adheres to BP's Well Integrity Systems Policy and will remain shut-in until the communication has been repaired. A State witnessed MITIA for UIC compliance will be conducted once the repair is complete and the well is on injection. The application for Sundry cancellation form 10-404 is attached. If you require any additional information, please contact Anna Dube or myself at (907) 659-5102. Sincerely, ~~~ ~. ~~~-~5 Andrea Hughes Well Integrity Coordinator ORIGINAL • Attachments: Application for Sundry Cancellation form 10-404 s-~~ ~.E~~IV~D STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION NQV 1 ~ ~~~~ REPORT OF SUNDRY WELL OPERA~IED~ias Cons. Commission A nnl.nr~nn 1. Operations Performed: "" ~~ '°' I Abandon Repair Well Plug Perforations Stimulate ~ Other~X 10-403 Canc Alter Casing Pull Tubing Perforate New Pool Waiver Time Extension Change Approved Program Operation Shutdown Perforate ~ Re-enter Suspended Well 2. Operator gP Exploration (Alaska), Inc. Name: 4. Current Well Class: Development ~ Exploratory 5. Permit to Drill Number: 191-1430 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 Stratigraphic~ ServiceQX 50-029-22229-00-00 7. KB Elevation (ft): 9. Well Name and Number: 60.00 04-42 8. Property Designation: 10. Field/Pool(s): ADL-028325 Prudhoe Bay Field / Prudhoe Bay Pool 11. Present W elt Condition Summary: Total Depth measured 9337 feet true vertical 9090.5 feet Effective Depth measured 9018 feet true vertical 8790.8 feet Casing Length SIZe CONDUCTOR 80 20" 91.5# H-40 SURFACE 3469 10-3/4" 45.5# NT-80L PRODUCTION 8688 7-5/8" 29.7# L-80 LINER 906 5-1/2" 17# L-80 Perforation depth Plugs (measured) EST Top of CMT ~ 9018' (11/03/05) Plugs (measured) Sand Plug C 9083'-9157' (11/03/05) Junk (measured) None MD TVD Burst Collapse 35 - 115 35.0 - 115.0 1490 470 34 - 3503 34.0 - 3502.5 5210 2480 33 - 8721 33.0 - 8510.7 6890 4790 8430 - 9336 8236.6 - 9089.6 7740 6280 Measured depth: 8814-8880 True vertical depth: 8538-8601 Tubing (size, grade, and measured depth): 4-1/2" 12.6# L-80 @ 31 - 8436 Packers &SSSV (type & measured depth): 4-1/2" AVA TRSV SSSV Nipple ~ 2179 4-1 /2" Baker Packer W/K-22 Anchor C~ 8348 4-1/2" Baker SABL Permanent Packer C~ 8365 12. Stimulation or cement squeeze summary: Intervals treated (measured): - ~)~f ,~ ~ 2oQ~ Treatment descriptions including volumes used and final pressure: 13 Representative Daily Average Production or Iniection Data Prior to well operation, Subsequent to operation 14. Attachments: Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Last Injection 06/20/07 7321 100 15 --- --- 0 0 1842 Copies of Logs and Surveys run Daily Report of Well Operations _ X 15. 16. Well Oil 7. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Andrea Hughes Printed Name Andr a Hughes Signature ~ ,rj , , ~ f ,~~ /~ ,~..~ r proposed work: Exploratory Development Service~X r proposed work: Gas WAG ~ GINJ~ WINJ^X WDSPL~ Prepared by DeWayne R. Schnorr (907) 564-5174. Sundry Number or N/A if C.O. Exempt: 302-059 Title NSU, ADW WI Coordinator Phone 659-5102 Date 11/6/07 Form 10'404 Revised 4/2004 ~ U K { l7 I (V H L ~~~ 1 „~ 04-42 (PTD #1911430) Inter~Waiver Cancellation -Not Operable Well Page 1 of 1 i Maunder, Thomas E (DOA) From: NSU, ADW Well integrity Engineer [NSUADWWeIlfntegrityEngineer@BP.com] Sent: Tuesday, October 30, 2007 10:26 AM To: Maunder, Thomas E {DOA); Regg, James B {DOA); NSU, ADW Weft Operations Supervisor; Rossberg, R Steven; GPB, FS2 DS Ops Lead; GPB, Area Mgr East {FS1f2fCOTU/Seawater); GPB, FS2/COTU OTL; GPB, Wetts Opt Eng; GPB, EOC Specialists Cc: Chivvis, Robert; NSU, ADW Well Integrity Engineer NSU, ADW 1M Tech Subject: 04-42 (PTD #1911430} Internal Waiver Cancellation -Not Operable Well AII, An internal waiver was issued for TxtA ~mmunication on well04-42 {PTD #1911434) on 11f12/05. A corresponding AOGCC Sundry was approved on 02f19l02. This well is allowed to inject under dispensation from the Well Integrity Policy until 12f31/07 if att compliance testing remains current. Given an tBP is required to conduct a CMIT-TxIA for compliance, the decision has been made to forego this work and cancel the waiver and sundry now. The well has been reclassified as Not Operable and wits be secured. Please remove all Waivered well signs and the laminated copy of the waiver from the wellhouse. The corresponding sundry cancettatian will be sent to the AOGCC. Please colt if you have any questions. Thank you, Anna ~u6e, ~~'. E. Welt Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 11/l 5!2007 04-42 (PTD #1911430) Internal ~ver Cancellation -Not Operable Well Page 1 of 1 • Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeI{IntegrityEngineer@BP.com] ''~ Sent: Tuesday, October 30, 2007 10:26 AM '~~~~ +~-~.C To: Maunder, Thomas E (DOA); Regg, James B (DOA); NSU, ADW Well Operations Supervisor; Rossberg, R Steven; GPB, FS2 DS Ops Lead; GPB, Area Mgr East (FS1/2/COTU/Seawater); GPB, FS2/COTU OTL; GPB, Wells Opt Eng; GPB, EOC Specialists Cc: Chivvis, Robert; NSU, ADW Well Integrity Engineer; NSU, ADW WI Tech Subject: 04-42 (PTD #1911430} Internal Waiver Cancellation -Not Operable Well All, /' An internal waiver was issued for TxIA communication on well 04-42 (PTD #1911430) on 11/12/05. A corresponding AOGCC Sundry was approved on 02/19/02. This well is allowed to inject under dispensation from the Well Integrity Policy until 12/31/07 if all compliance testing remains current. Given an IBP is required to conduct a CMIT-TxIA for compliance, the decision has been made to forego this work and cancel the waiver and sundry now. ~'~ The well has been reclassified as Not Operable and will be secured. Please remove all Waivered well signs and the laminated copy of the waiver from the wellhouse. The corresponding sundry cancellation will be sent to the AOGCC. Please call if you have any questions. ~~~~ ~~~ ~ ~~ 2D0~ 11ni2oo~ . MEMORANDUM State of Alaska . Alaska Oil and Gas Conservation Commission TO: Jim Regg P.I. Supervisor ~f17(t1Io 7 DATE: Tuesday, July 03, 2007 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 04-42 PRUDHOE BA Y UNIT 04-42 Src: Inspector \ q \- 14-3 FROM: Lou Grimaldi Petroleum Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv_1g¿. Comm Permit Number: 191-143-0 Inspector Name: Lou Grimaldi Inspection Date: 5/29/2007 Well Name: PRUDHOE BAY UNIT 04-42 Insp Num: mitLG070529144757 Rei Insp Num: API Well Number: 50-029-22229-00-00 Packer Well I 04-42 ¡Type Inj. i w I TVD . : ì P.T.D; 1911430 ITypeTest I SPT ¡ Test psi Interval REQVAR P/F P Depth Pretest Initial 15 Min. 30 Min. 45 Min. i 8176 vf IA I 1070 ! 1070 ! 1060 "; 1060 ! 1060 0044ÎOA í -~¡;;-o-f2250 i 2205 I 2180 /" Tubing : 480 ~ 490 I-~-r-;¡so : 480 60 Min. Notes: MIT ofOA for Variance compliance. 2.4 bbl's of70 deg F dead crude pumped. Large decline at first 15 minute interval, possible thermal ./ effect Held test additional 15 minutes. v 5CANNEO JUl 20 2001 Tuesday, July 03, 2007 Page 1 of 1 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Ope rat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: . STATE OF ALASKA _ ALAS Oil AND GAS CONSERVATION COMM~N REPORT OF SUNDRY WELL OPERATIONS D D D P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development Stratigraphic StimulateD Other 10 lap ~Et]0¡j Waiver D Time Extension D Re-enter SusperJ~¡:Well:D 5. Permit to Drill Number: 191-1430 3. Address: Exploratory Service w 6. API Number: 50-029-22229-00-00 9. Well Name and Number: 60 KB PBU 04-42 ADLO-028325 11. Present Well Condition Summary: 10. Field/Pool(s): Prudhoe Bay Field Field/ Prudhoe Bay Oil Field Pool 8. Property Designation: Total Depth measured 9337 feet Plugs (measured) true vertical 9090.5 feet Junk (measured) Effective Depth measured 9246 feet Ci¡ ftc. true vertical 9005 feet Casing Length Size MD TVD CONDUCTOR 80 20" 91.5# H-40 35 - 115 35 - 115 SURFACE 3469 10-3/4" 45.5# NT-80LH 34 - 3503 34 - 3502.52 INTERMEDIATE 8688 7-5/8" 29.7# L-80 33 - 8721 .33 - 8510.7 PRODUCTION 906 5-1/2" 17# L-80 8430 - 9336 8236.57 - 9089.56 None None Burst 1490 5210 6890 7740 Collapse 470 2480 4790 6280 Perforation depth: Measured depth: 9142 - 9148 True Vertical depth: 8907.4 - 8913.03 9142 - 9145 8907.4 - 8910.22 9150 - 9165 8914.91 - 8929 9171 - 9190 8934.64 - 8952.48 Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 31' - 8436' Packers and SSSV (type and measured depth) 4-1/2" AVA TRSV SSSV NIPPLE 4-1/2" Baker Packer W/K-22 Anchor 4-1/2" Baker SABL Permanent Packer o 2179 8348 8365 o 12. Stimulation or cement squeeze summary: Intervals treated (measured): °F-· p I. fi 2006 Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl o o Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure o ~M 0 o Shut in 0 15. Well Class after proposed work: Exploratory Development 16. Well Status after proposed work: Oil Gas WAG Tubing pressure 1702 o 13. Service w x Contact Gary Preble WINJ w WDSPl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title Data Engineer Date 11/13/2006 Submit Original Only . . 04-42 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 11/5/2006 300/520/320. ASSIST E-LlNE; Freeze protect the Tbg. with 38 bbls of 60/40 Meoh. The well is twinned with 04-45. The S-Riser only has needle valves so we can not freeze protect it. Final WHP= 950/800/250. ,-A-m'^," __~m"''''', W."^" w^'w·, W~__ 'mm 30/250/Vac. Temp=SI. No AIL. T & IA FL pre-IBP (WC). TBG FL @ 6704 ?(101 bbls). IA FL near surface. FROM PREVIOUS DAY SHUT IN ON ARRIVAL. SET 3-3/8" BAKER IBP IN 5-1/2" LINER. CENTER ELEMENT SET AT 8500'. TOP OF IBP IS AT 8493.5'. POSITIVE INDICATION OF SET SEEN ON SURFACE. FINAL TI II 0 = 25/ 120/0. WELL LEFT SHUT IN. TURNED OVER TO DSO. ***** JOB COMPLETE***** FLUIDS PUMPED B~LS I.. DI ESEL 1 .. Total - .._-,-- - ....- .. _ STATE OF ALASKA _ DEC 1 6 2005 ALA" Oil AND GAS CONSERVATION COM~ION. . . REPORT OF SUNDRY WELL OPERATIONS Alaska OIl & Gas Cons. CommIssIon o o o Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development 0 Stratigraphic 0 Stimulate 0 Other 0 Waiver 0 Time Extension 0 Re-enter Suspended Well 0 5. Permit to Drill Number: 191-1430 PI 6. API Number: 50-029-22229-00"00 9. Well Name and Number: Exploratory Service ..." 1. Operations Abandon 0 Repair Well 0 Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Ope rat. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 60 KB 04-42 ADL-028325 11. Present Well Condition Summary: 10. Field/Pool(s): Prudhoe Bay Fieldl Prudhoe Bay Oil Pool 8. Property Designation: Total Depth measured 9337 true vertical 9090.5 feet feet Plugs (measured) Junk (measured) None None Effective Depth measured 9246 true vertical 9005.06 feet feet Casing Conductor Surface Intermediate Production Length Size MD TVD Burst Collapse 80 20" 91.5# H-40 35 - 115 35 - 115 1490 470 3469 10-3/4" 45.5# NT-80LHE 34 - 3503 34 - 3502.52 5210 2480 8688 7 -5/8" 29.7# L-80 33 - 8721 33 - 8510.7 6890 4790 906 5-1/2" 17# L-80 8430 - 9336 8236.57 - 9089.56 7740 6280 Perforation depth: Measured depth: 8814 - 8880 Open True Vertical depth: 8598.52 - 8660.76 9142 - 9148 Closed 8907.4 - 8913.03 9145 - 9165 Closed 8910.22 - 8929 9170-9190 Closed 8933.7 - 8952.48 Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 31 - 8436 Packers and SSSV (type and measured depth) 4-1/2" AVA TRSV SSSV NIPPLE 4-1/2" Baker SABL Permanent Packer 2179 8365 12. Stimulation or cement squeeze summary: Intervals treated (measured): :~ÇANt\!IEL [1 E C ~. =: Treatment descriptions including volumes used and tinal pressure: Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl o o Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure o 0 0 o 0 0 Tubing pressure o o 13. x 15. Well Class after proposed work: Exploratory Development 16. Well Status after proposed work: Oil 0 Gas 0 WAG Service PI R8DMS SFl DEC ] 9 2005 WINJ PI WDSPl Contact Sharmaine Vestal Sundry Number or NIA if C.O. Exempt: 305-~ I r1U /:J1/1ÞS 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Sharmaine Vestal Signat~ ~ Title Data Mgmt Engr Phone 564-4424 Date 12/14/2005 Form 10-404 Revised 04/2004 AL Submit Original Only ... e e 04-42 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY H?¡ÄQ11VIrfl~t'TE¡~J SUM'MARY '" L'~~ :: .viÎl 7/21/2005 OA Down Squeeze, Pumped 10 bbl Methanol, 10 bbl chemical wash, 20 bbls of fresh water, 20 bbls 15.7#/gal Arctic Set cement. Displace with 5 bbls of water and 106 bbls of crude. 7/24/2005TIO=ONACNAC POST OA DOWN SOZ MIT OA PASSED 2400 PSI TEST PUMPED 3 BBLS CRUED 75* BLEED BACK 3 BBLS TIO=ONAC/O FLUIDS PUMPED BBLS 10 Meth 10 Chemical wash 25 Water 20 Cement 106 Crude 171 TOTAL MEMORANDUM e State of Alaska e Alaska Oil and Gas Conservation Commission FROM: John Crisp Petroleum Inspector DATE: Wednesday, November 16, 2005 _ --'--K4j'6}JlI~ o~ ___~!!JECI: M¡:¡;h-ªniçajJntegrin: Tests__ . \ \ BP EXPLORATION (ALASKA) INC 04-42 PRUDHOE BAY UNIT 04-42 --~~--~ \~ \1 \ --"-'-~- TO: Jim Regg -- ---------I>.I.Supervisor- Src: Inspector Reviewed By: "-f?r:> P.I. Suprv -Jv¡c-- Comm NON-CONFIDENTIAL Well Name: PRUDHOE BAY UNIT 04-42 API Well Number 50-029-22229-00-00 Inspector Name: John Crisp Insp Num: mitJCr051111100807 Permit Number: 191-143-0 Inspection Date: 11/10/2005 ReI Insp Num Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 04-42 ¡Type Inj. N TVD 8176 I IA i 310 i 2500 i 2490 I 2480 , ! I i P.T. 19II430 iTypeTest SPT Test psi 2044 lOA I 0 I 240 I 250 ! 250 I ¡ I ! Interval REQVAR P/F P Tubing! 240 I 2360 ! 2350 ! 2340 I i Notes CMIT - TxIA for new waiver. 3 bbl's pumped for PI. Wednesday, November 16,2005 Page 1 of 1 Ht:Ct::IVED STATE OF ALASKA ALASKA Oil AND GAS CONSERVATION COMMISSION NOV 1 6 2005 REPORT OF SUNDRY WELL OPERATION&\laska Oil & GasC 1. Operations Abandon D Repair Well D Plug Perforations 0 Stimulate D Other [br.fw'. Performed: Alter Casing D Pull Tubing D Perforate New Pool D WaiverD Time Extension D Change Approved Program D Operat. Shutdown D Perforate 0 Re-enter Suspended Well D 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory 3. Address: P.O. Box 196612 Stratigraphic [J Service Anchorage, AK 99519-6612 7. KB Elevation (ft): 6. API Number: 50-029-22229-00-00 9. Well Name and Number: 60 KB 04-42 8. Property Designation: ADL-028325 11. Present Well Condition Summary: 10. Field/Pool(s): Prudhoe Bay Field/ Prudhoe Bay Oil Pool Total Depth measured 9337 true vertical 9090.5 feet feet Plugs (measured) Junk (measured) None None Effective Depth measured 9018 true vertical 8790.76 feet feet Casing Conductor Surface Production Liner Length Size MD TVD Burst Collapse 80 20" 91.5# H-40 35 - 115 35 - 115 1490 470 3469 10-3/4" 45.5# NT-80LHE 34 - 3503 34 - 3502.52 5210 2480 8688 7-5/8" 29.7# L-80 33 - 8721 33 - 8510.7 6890 4790 906 5-1/2" 17# L-80 8430 - 9336 8236.57 - 9089.56 7740 6280 Perforation depth: Measured depth: 8814 - 8880 True Vertical depth: 8598.52 - 8660.76 .'~..Ji¡,. ~'''U::ì . [n: P .¡ 'ï;;flooIna~e'::l~t..J H..I¿ 1. 6 2005 Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 31 - 8436 Packers and SSSV (type and measured depth) 4-1/2" AVA TRSV SSSV NIPPLE 4-1/2" Baker Packer W/K-22 Anchor 4-1/2" Baker SABL Permanent Þacker 2179 8348 ----S365 12. Stimulation or cement squeeze summary: Intervals treated (measured): RBDMS 8Ft 1 ¡ 2005 Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl o o Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure o 0 0 o 0 0 15. Well Class after proposed work: Exploratory Development [J 16. Well Status after proposed work: Oil Gas [J WAG [J Tubing pressure o o Service P1 x Contact Sharmaine Vestal WINJ P1 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title Data Mgmt Engr Printed Name Sharmaine Vestal ·~·Phone 564-4424 Date 11/15/2005 Form 10-404 Revised 04/2004 ORIG1NAL Submit Original Only @ .. 04-42 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY I AC1'IVITYDATE I SUMMARY 10/6/2005 IBP - DID NOT INFLATE COMPLETELY, STUCK IN 4.5" TUBING, FISHING NECK 1 3/8" AT 8355', TOTAL LENGTH OF TOOL 32' 10/8/2005 *** CONTINUED FROM WSR 10-07-05 *** (fish ibp ) OUT OF HOLE W/ BAKER IBP FROM 9120' SLM, RUN 41/2" - 3 PRONG GRAB, 4 1/2" BLB, 3.62 SWAGE TO 9133' SLM, DID NOT RECOVER CENTER ELEMENT FROM IBP, RUN SIB, TEL, 3.62 CENT, LOCATED EOT @ 8414' SLM + 24' = 8438' ELM, TAGGED SOFT BOTTOM AT 9155' ELM *** WELL LEFT SHUT IN **** 11/3/2005 Job continued from 11-2-05 WSR. RIH w/ 2.25" BDN. Lay in carbolite slurry. Allow sand to settle. Tag at 9000' up wt. Clean sand top to 9085' by reversing out. Dry tag at 9083' ctm/up. POH - FP well - MU/ RIH with pig ear noz mix/pump 1.6 bb115.8 ppg Class G cmt place on sand top at 9083' est TOC 9020'. POH / FP well to 2500' w/ diesel LD pig ear nozzle & RD Job complete 11/11/2005 PERFORATED 8814'-8880' WITH 3 3/8" POWERJET 3406,6 SPF. CHARGE DATA: 38.6" PENE, 0.45" EH, 22.7 GMS. CORRELATED TO SWS CBL DATED 28-DEC-1991, LOGGED 8900'-8300'. FLUIDS PUMPED BBLS 44 Diesel 206 60/40 Meth 8 Carbolite slurry 291 1 % KCL 90 FW 1.6 Cement 640.6 TOTAL ~\. r~å\~ II Œ .. ì I \ I i r W !. lJ ) 1.1111 }. i .'. '~\.., n. . ®.A1 ((ù. , i ¡!~i7, !.~.:;:',i1 \ Iii ¡(J\ II· djl\\~\! l '\ Jð;~ l\~! ¡I\. Lb!Jlj cQ) U,,\l/ ~ ) /7/- Ié./!J A"fA~1iA OIL AND GAS CONSERVATION COltDlISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Jennifer Julian Wells Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 SCANNED JUL 1 2 2005 Re: Prudhoe Bay 04-42 Sundry Number: 305-174 Dear Ms. Julian: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decisi Superior Court unless rehearing has been requested. ~ DATED thisJi day of July, 2005 Encl. ) ) July 05, 2005 RECEIVED JUL 0''7 Z005 C Commission Alaska 0\\ & GII onl. Anchorage Winton Aubert Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Dear Winton: RE: Sundry Notice for 04-42 OA Downsqueeze BP Exploration Alaska, Inc. proposes to do the following wellwork to obtain an injection waiver for well 04-42. Step Type P roced u re 1 0 OA FL depress /' 2 F OA cement down squeeze / 3 F MIT OA after WOC Well 04-42 is an injector which requires a waiver for TxlA communication. In // order to waiver the well for injection, an OA down squeeze must be performed. CITOA on 05/13/2005 failed with an estimated LLR of 2.5 bpm at 1700 psi. This program is designed to pump a column of cement from the shoe to /' approximately 500 feet above the shoe for waiver compliance. Please contact Jennifer Julian at 564-5663 (H) 274-0929, (Cell) 240-8037 with any questions. Sincerely, ~~~~~ ~nnifer Julian Wells Engineer ORIGINAL 1. Type of Request: Abandon D Suspend D Alter Casing 0 Repair Well I&J Change Approved Program D Pull Tubing D \AlGA- 1/1 / ~oo~ RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION JUL 07 2005 APPLICATION F~~A~~.~~RY APPROVAih Oil & ell Cons. COnmission And,orage Perforate 0 Waiver D Other 0 StimulateD Time Extension 0 Re-enter Suspended Well D ) STATE OF ALASKA ) Plug Perforations Perforate New Pool o D D Operation Shutdown 2. Operator Name: 4. Current Well Class: BP Exploration (Alaska), Inc. Development 0 Exploratory 0 5. Permit to Drill Number: 191-1430 /' 60.00 KB Stratigraphic 0 Service Œ] 9. Well Name and NumD~,b r: 04-42 / 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool PRESENT WELL CONDITION SUMMARY Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): 9090.5 9246 9005.0 S~ MD nD ,/ I 6. API Number / 50-029-22229-00-00 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 8. Property Designation: ADL-028325 11. Present Total Depth MD (ft): 9337 Casing Length Plugs (md): None Burst Junk (md): None Collapse CONDUCTOR SURFACE INTERMEDIATE PRODUCTION top bottom top bottom 80 20" 91.5# H-40 35 115 35.0 115.0 3469 10-3/4" 45.5# NT-80L 34 3503 34.0 3502.5 8688 7-5/8" 29.7# L-80 33 8721 33.0 8510.7 906 5-1/2" 17# L-80 8430 9336 8236.6 9089.6 1490 5210 6890 7740 470 2480 4790 6280 Perforation Depth MD (ft): 9142 - 9148 9145 - 9165 9170 - 9190 Perforation Depth TVD (ft): 8907 - 8913.0 8910 - 8929.0 8934 - 8952.5 Tubing Size: 4-1/2" 12.6# TBG-PC Tubing Grade: Tubing MD (ft): L-80 31 8436 Packers and SSSV Type: 4-1/2" Baker Packer W/K-22 Anchor 4-1/2" Baker SABL Permanent Packer 4-1/2" AVA TRSV SSSV NIPPLE Packers and SSSV MD (ft): 8348 8365 2179 12. Attachments: 13. Well Class after proposed work: /' Description Summary of Proposal ŒI Detailed Operations Proç¡ram D BOP Sketch D 14. Estimated Date for Commencing Operation: July 20, 2005 Exploratory D DevelopmentD 15. Well Status after proposed work: Oil D GasD ServiceŒ] 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Date: WAGD GINJD PluggedD ~,bandonedD / WINJŒ] WDSPLD Prepared by DeWayne R. Schnorr 564-5174. Jennifer Julian Contact Printed Name Signature Jennifer Julian Title Phone Wells Engineer 564-5663 7/6/05 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness BOP TestD Mechanciallntegrity Test ~ Location Clearance D RBDMS BFL .J U I. 1 1 7005 Sundry Number: .3o~"1 7 f \C -- Ir-O t\- ' BY ORDER OF THE COMMISSION Date: ¡fr~Í ~ Form 10-403 Revised 11/200 ORIGINAl SUBMIT IN DUPLICATE ) TREE = FMC G EN IV W8..LHEA[J'= FMC GEN IV )i:¡;füA:rõ'R=·""'''·AXËlSõ'N KB.·äËV";·· H' 6(ji 'äF:'"Ë[EV''~''''' RÖp··;; "·5M5; "",,,"n. .. '.m........~..".,.,"".........,.,..,""''''...................,~'''''''''n'......m''''.... "~.~.~.~ß.~..~...M.~~"~..?~Z~, Datum MD = 9092' Datum TVD = 8800' SS 110-314" eSG. 45.5#. L - 80. ID = 9.953" H 3503' ¡-J ~ Minimum ID = 3.75" @ 8423' 4-112" PARKER SWN NIPPLE ITOPOF 5-1/2" LNR 1--1 8430' 14-112"1BG-PC, 12.6#,L-80, .0152 bpf,ID=3.958" 1-1 8436' ) O 4 42 ...SAFETY NOTES: ***RAPID T X IA COMM. (02126/03 - /' W AlVER)*** (I) ~ ~ "" :8: ~ I 'I;:!,! I 17-518" CSG, 29.7#, L-80, ID = 6.875" 1-1 8721' ~ PERF ORA TION SUMtv1A RY REF LOG: A WS BHCA ON 12/26/91 ANGLEA TTOP ÆRF: 20 @ 9142' t\bte: Refer to A"oduction DB for historical perf data SIZE SPF INTER\! AL Opn/Sqz DATE 3-3/8" 14 9142 - 9148 0 01120/92 3-3/8" 10 9145 - 9165 0 07/14/96 3-3/8" 10 917/9190 0 07/14/96 I FETD H 9246' 15-1/2" LNR, 17#, L-80, .0232bpf, ID =4.892" H 9336' ~ 9337 DATE 01101/92 06/12/01 02126/03 10/11/03 RBI BY COMv1ENTS ORIGINAL COM PLETION RN'tlh CORRECTIONS JrvP/KK WAIVER SAFErY NOTE JBtvVTLP CORRECT NIP ID AT 8423' DATE .. I I x I J )( )(. .. I XI" XI 2179' 1-14-1/2" AVA TRSV SSSV NIP, ID =3.810" I 8346' 1-14-1/2" LOC SEAL ASSY, ID = 3.880" 1 8348' 1-14-1/2" BKR FER W/K-22 ANCHOR, ID = 4.500" 8365' 1-7-5/8" X 4-1!2"BKRSABL PERtv1ANENT PKR, ID = 3.880" 8423' 1-14-1/2" PKR SWN NIP, ID = 3.725" 8434' 8438' H4-1/2" TBG TAIL WLEG, ID= 3.960" I HTTELMD03/01/921 PRLOHOE BA Y UNIT WEL L: 04-42 PERMIT No: 1911430 AA No: 50-029-22229-00 SEC34, T11N, R15E, 1353.73' F8.. & 1494.07' FNL BP Exploration (Alas ka) Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth 10/31/03 NO. 3017 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job # Log Description Date Blueline Prints CD H-19B _~ ~ ~ t_~ MEM PPROF & IPROF LOG 09/29/03 1 H-27A ~)~ ~:~~ MEM PPROF & IPROF LOG 10101/07 1 D.S. 1-10 I ~/_~--C~)~ PSP LDL 10/25103 1 D.S. 15-23 ) c~ t - I ~ RST GRAVEL PACK LOG 07110103 1 D.S. 14-23 PSP LDL 10/24103 1 P1-17 I ~' ,'~ ~(~,~=~ ( PROD PROFILE W/DEFT/GHOST 10/26103 1 D.S. 4-42 I q I" I L.~_~' LDL 10/22/03 1 GEl-02 ['_~ _'~ '~/~-~ TEMP PROFILE/SBHP SURVEY 10/08103 1 D.S. 6-16 i~t~-O_'~'~2 LDL 10112/07 1 Pl-18A ~ -C'~"-~(.¢2 PROD PROFILE W/DEFT 10/15107 1 D.S. 5-28A ~"~1 '~ t~--~'~ LDL 10114/03 1 D.S. 12-20 I~--'~1~'~ LDL 10/21/03 1 2-32/SN-03 I ~O ' [ ~ ~_, LDL 10/25/07 1 Z-39 ~;)(~ '-- ~ 10663105 RST-SIGMA 09/22/03 I t )~L.~ ~" PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd..~: ..~,: ..... ;.'~,,~, ~f :~'% ~?";~.=,,, ~..~ ~\~ ,~{"~.,=,,.,=,,. ""'~ .~'..~, Anchorage, Alaska 99508 "!"~.~:~,i ....... ';.k.~, ~ .... ~*'~.~ ~ .'~.,=,~,' Date Delivered: Schlumberger GeoQuest 3940 Arctic BIvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Email to: Winton_Aubert@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us OPERATOR: FIELD / UNIT ! PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska)Inc. Prudhoe Bay / PBU / DS 4 10/31/03 Joe Anders None Packer Depth Pretest Initial 15 Min. 30 Min. We11104-42 I Typelni. I N 'I'VD I 7,176' Tubin~lI 01 2,4601 2,3801 2,3401 IntervaI 2 P.T.D. I1911430I ITypetest P Test psil 1794 Casin~ll01 2,5O01 2,4001 2,3701 P/FI P Notes: CMIT TxlA against an IBP, required by Sundry #302-059. WellI Ini. TVD p.T.D.I ITyPe I I I Notes: WellI Type ,nj.I TVD Tubin~lI P.T.D.I Type tesl~ I,Jl II I'n'e~"l Test Casin~ll P/FI Notes: I Type Ini.I TVD Tubingl Test Casin~ll P/FI Notes: We,I Type ~ni.I TVD Tubin~lI Test Casin~ll P/FI Notes: Test Details: TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover O = Other (describe in notes) MIT Report Form Revised: 06/19/02 MIT PBU 04-42 10-31-031 .xls BP Exploration (Alaska) Inc. Post Office Box 196612 PRB-24 Anchorage, Alaska 99519-6612 bp February 2, 2002 Mr. Tom Maunder, P.E. Alaska Oil & Gas Conservation Commission 333 W. 7th Ave. Anchorage, Alaska 99501 Subject: 04-42 (PTD 1911430) Application for Sundry Approval Dear Mr. Maunder: Attached is Application for Sundry Approval form 10-403 for well 04-42. This request is for approval to continue produced water injection with known tubing by inner annulus communication. A description summary of proposal and wellbore schematic is included. If you require any additional information or clarification, please contact either Kevin Yeager or me at (907) 659-5102. Sincerely, O~e Anders, P.E. Well Integrity Engineer Attachments RECEIVED Ala~l~a Oil & Gas Cons. .4nChora.~ Con~nlission STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. ~:ype of' 'i;quest: Abando'r~'- .... Suspend_ Operational shutdown _ Re-enter suspended well_ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance _X Perforate _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__ RKB 60.0 feet 3. Address Exploratory__ 7. Unit or Property name P. O. Box 196612 Stratigraphic __ Anchorage, AK 99519-6612 Service__X Prudhoe Bay Unit 4. Location of well at surface 8. Well number 565' FNL, 455' FEL, Sec. 34, T11 N, R15E, UM (asp's 712392, 5951295) 04-42 At top of productive interval 9. Permit number / approval number 1357' FNL, 1216' FEL, Sec. 34, T11N, R15E, UM (asp's 711655, 5950482) At effective depth 10. APl number 1469' FNL, 1328' FEL, Sec. 34, T11 N, R15E, UM (asp's 711546, 5950366) 50-029-22229-00 At total depth 11. Field / Pool 1498' FNL, 1355' FEL, Sec 34 T11N, R15E, UM (asp's 711521, 5950339) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 9337 feet Plugs (measured) PBTD Tagged @ 9228' MD (11/13/1999) true vertical 9090 feet Effective depth: measured 9228 feet Junk (measured) true vertical 6968 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 115' 20" 175' 175' Surface 3466' 10-3/4" 2734 c.f. Class 'G' 3501' 3501' Intermediate 8684' 7-5/8" 377 c.f. Class 'G' 8719' 8509' Liner 894' 5-1/2" 135 c.f. Class 'G' 8440' - 9334' 8246' - 9087' RECEIVED Perforation depth: measured Open Perfs 9142' - 9165', 9170' - 9190' FEB t~ue vertical Open Peds 8910' - 8929', 8934' - 8953' alaska Oil & Gas Cons. Oomm~or~ Tubing (size, grade, and measured depth 4-1/2", 12.6#, L-80 PCT @ 8365. 4-1/2", 12.6#, L-80 PCT Tubing Tail @ 8438'. Packers & SSSV (type & measured depth) 4-1/2" BKR PBR W/K-22 Anchor @ 8348'; 7-5/8" x 4-1/2" BKR SABL Perm PBR @ 8365' MD. 4-1/2" AVA TRSV SSSV Nipple @ 2179' MD. 13. Attachments Description summary of proposal __X Detailed operations program__ BOP sketch__ 14. Estimated date for commencing operation 15. Status of well classification as: 16. If proposal was verbally approved Oil__ Gas__ Suspended __ Name of approver Date approved Service Injection Well 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Questions, call Joe Anders / Kevin Yeager 907/659-5102. Signed _,~ ~ Title:WelllntegrityEngineer Date February042002 Joe Anders~ P.E. Prepared by DeWa)/ne R. Schnorr 564-5174 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness ~l~,~¢~;'~"~...~)~'~,,,'~ ] Approvaln.._~ Plug integrity __ BOP Test Location clearance __ C)~,.,. -- O ~" c-~.q Mechanical Integrity Test ~(~"¥'~ ~"~='-- ~::~'~'~_ T'~'-~Subsequent form required I - 0riginal Si'l~ned By Approved by order of the Commission Cammu ~_a_~el; Commissioner Date Form 10-403 Rev 06/15/88 · SUBMIT IN TRIPLICATE 04-42 Description Summary of Proposal 02/04/02 Problem: Injector with rapid TxlA communication Well History and Status Well 04-42 (PTD 1911430) is an injector that failed an MIT-IA on 03/16/00. The MITIA failed and a leak rate of 12 GPM @ 2450 psi was established. A tubing tail plug was set and a CMIT TxlA passed to 2500 psi on 11/25/01. Recent events: > 03/16/00: MITIA FAILED, LLR 12 GPM @ 2450 psi. > 11/23/01: SL set TTP > 11/25/01: CMIT Passed to 2500 psi > 01/10/02: Pull plug This sundry request is to allow for continued injection of water. The following supports the request: - A CMIT-TxlA Passed on 11/25/01 to 2500 psi against a tubing plug, demonstrating competent production casing. - Pressures and injection rates will be monitored and recorded daily and checked for indications of a production casing leak. - A CMIT TxlA against a TTP will be conducted every 2 years to confirm production casing integrity. Proposed Action Plan 1. Allow well to continue water-only injection. 2. Perform combination MIT Tubing x IA against a plug every 2 years. 3. Record wellhead pressures and injection rates daily. 4. Submit a monthly report of daily pressures and injection rate. 5. Stop injection and notify the AOGCC if there is any indication of loss of production casing integrity. TREE = FMC G EN IV WRLHEA~= FMCGENIV A%-'TUA TOR= AXELSON ........... KB. ELEV = 60' BF. ELEV = KOP = 5915' Max Angle = 25 @ 7473' Datum MD = 9092' Datum TVD= 8800' SS I 10-3/4" CSG, 45.59, L-80, ID = 9.953" 04-42 SAFETY NOTES H4-1/2" AVA TRSV SSSV NIP, ID = 3.810" H4-1/2" LOC SF_A L ASSY, ID = 3.880"I I--~4-1/2" BKR FBR W/K-22 ANCHOR, ID: 4.500" I 14Minimum D= 3.75" @ 8423' 1/2" PARKER SWN NPPLE I--~7-5/8"x4-1/2"BKR SABL FERMANENT PKR, ID = 3.880" 4-1/2" TBG-PC, 12.6#, L-80, 0.0152bpf, ID: 3.958" 17-5/8"CSG, 29.7#,L-80,1D:e.875" ]--~ 8721' PERFORATION SUMMA RY REF LOG: AWS BHCA 12/26/91 ANGLEATTOP PERF: 20 @ 9142' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 14 9142 - 9148 O 01/20/92 3-3/8" 10 9145- 9165 O 07/14/96 3-3/8" 10 9170 - 9190 O 07/14/96 F'~d 9246' I 5-1/2" LNR, 17#, L-80, 0.0232bpf, ID = 4.892" Id 9336' 9337' H4-1/2" PKR SWN NIP, ID = 3.750" I H4-1/2" TBG TAIL WLEG, ID = 3.960"I 8438' HTT ELIVD 03/01/92I DATE REV BY COIVIVIENTS DATE 01/01/92 ORIGINAL COMPLETION 01/08/01 S IS- MWF CONVERTED TO CA NV AS 01/17/01 SIS-MD INITIAL RE:VISION 01/18/01 SIS-CL FINAL 06/12/01 RN/th CORRECTIONS PRUDHOE BAY UNIT WELL: 04-42 PERMIT No: 191-143 APl No: 500292222900 Sec. 34, T11N, R15E, 1353.73 FEL 1494.07 FNL BP Exploration (Alaska) Re: 04-42 (PTD 1911430) Return To Injection . . Subject: Re: 04-42 (PTD 1911430) Return To Injection From: Tom Maunder <tom_maunder@admin.state.ak.us> Date: Thu, 10 Jan 2002 12:09:40 -0900 To: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com> Joe/Kevin, I am just getting through my emails. Winton may have responded. Your proposal is acceptable to put the well back on water service. As usual, please add the well to the monitoring list. If you have an updated version of the wells on waiver according to the classification system you devised, I would appreciate a copy. Thanks. Tom "NSU, ADW Well Integrity Engineer" wrote: Hi Tom and Winton. Injection well 04-42 (PTD 1911430) failed an MITIA on 03/16/00 and is currently SI. Leak rate was 12 GPM @ 2450 psi. A TTP was set and the well passed a CMIT TxIA to 2500 psi on 11/25/01. Current plans are to pull the TTP and submit sundry form 10-403 requesting a variance to continue injection with the known TxIA communication. I'd like to request verbal approval to put the well on injection pending approval of the written variance. Thanks and call if you have any questions. Joe Joe Anders, P.E. / Kevin Yeager Well Integrity Engineer BP Exploration, (Alaska) Inc. (907) 659-5102 email: NSUADWWelllntegrityEngineer@bp.com s~ JUL 1 () 2007 1 of 1 ~~\,,~~ 6/12/200712:02 PM 04-42mitfail031600.txt Subject: [Fwd: 4-42 Failed MITIA, PTD 191-143-0] Date: Fri, 17 Mar 2000 12:08:08 -0900 From: Blair Wondzell <blair wondzell@admin.state.ak.us> Organization: State of Alaska, Dept of Admin, Oil & Gas To: Tom Maunder <tom maunder@admin.state.ak.us> Tom Please see this gets into our records. Blair Subject: 4-42 Failed MITIA, PTD 191-143-0 Date: Thu, 16 Mar 2000 15:22:35 -1000 From: "PRB Problem Wells" <P1041@mail.aai.arco.com> To: blair wondzell@admin.state.ak.us, tom maunder@admin.state.ak.us CC: lou_grimaldi@admin.state.ak.us Hello Blair and Tom. Well 4-42 (PTD 191-143-0) failed an MITIA today (3/16/00). Leak rate was 12 gpm @ 2460 psi. 4-42 was injecting sea water, 5500 bw pd @ 900 psi. It is currently shut-in. Leak location is unknown. The IA pressur e is tracking the tubing injection pressure, indicating the leak is from th e tubing into the IA. We are evaluating options for the well and have no immediate plans to return to injection. Call if you have any questions. Joe Anders Problem Well Specialist ARCO Alaska, Inc. 659-5102 email: pl041@mail.aai.arco.com Page 1 ,-42 Failed MITIA, PTD 191-143-0] -'-"-.,. ~-- Subject: [Fwd: 4-42 Failed MITIA, PTD 191-143-0] Date: Fri, 17 Mar 2000 12:08:08 -0900 From: Blair Wondzell <blair_wondzell@admin.state.ak. us> Organization: State of Alaska, Dept of Admin, Oil & Gas To: Tom Maunder <tom_maunder@admin.state.ak. us> Tom Please see this gets into our records. Blair Internal Subject: 4-42 Failed MITIA, PTD 191-143-0 Date: Thu, 16 Mar 2000 15:22:35 -1000 From: "PRB Problem Wells" <P1041@mail.aai.arco.com> To: blair_wondzell@admin.state.ak, us, tom_maunder@admin.state.ak, us CC: Iou_grimaldi@admin.state.ak. us Hello Blair and Tom. Well 4-42 (PTD 191-143-0) failed an MITIA today (3/16/00). Leak rate was 12 gpm @ 2460 psi. 4-42 was injecting sea water, 5500 bwpd @ 900 psi. It is currently shut-in. Leak location is unknown. The IA pressure is tracking the tubing injection pressure, indicating the leak is from the tubing into the IA. We are evaluating options for the well and have no immediate plans to return to injection. Call if you have any questions. Joe Anders Problem Well Specialist ARCO Alaska, Inc. 659-5102 email: p1041@mail.aai.aroo.com 1 of 1 3/17/00 12:24 PM STATE OF ALASKA ALASKA 0IL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing ~ Alter casing ~ Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 567' FNL, 457' FEL, Sec 34, T11 N, R15E, UM. At top of productive interval 1357' FNL, 1216' FEL, Sec 34, T11N, R15E, UM. At effective depth At total depth 1498' FNL, 1355' FEL, Sec 34, T11N, R15E, UM. 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 5O' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-42i 9. Permit number/approval number 91-143 10. APl number 50 - 029-22229 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9337 feet 9090 feet Effective depth: measured 9211 feet true vertical 8972 feet Plugs(measured) PBTD Tagged @ 92.1__t' MD(7/14/96~ ORIGINAL Junk(measured) Casing Length Size Conductor 115' 30" Surface 3451' 10-3/4" Production 8669' 7-5/8" Liner 894' 5-1/2" Cemented Measured depth True vertical depth 115' 115' 2734 cuft Class G 3501' 3501' 377 cu ft Class G 8719' 8509' 135 cu ft Class G 8440 - 9334' 8246 - 9087' Perforation depth: measured 9142 - 9165'; 9170 - 9190' true vertical 8910 - 8929'; 8934 - 8953' Tubing (size, grade, and measured depth) 4-1/2", L-80, 12.6#, PCT @ 8436' MD. Packers and SSSV (type and measured depth) Baker SABL Permanent Packer @ 8365' MD; 4-1/2" AVA TRSV SSSV @ 2179' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 587 627 Tubing Pressure 1792 1774 15, Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. / Signed ~j~ ~ '~,,~-/.a~a,'l ~ ¢-~ O~,~, Title Engineering Supervisor Form 10-4~0~Re~ 06/15/88v ~ -- Date 0~ ~/¢'~ "~ SUBMIT/IN DU(PLICATE ~" 4-42i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 7/1 4/96: MIRU & PT equipment. RIH w/perforating guns & tagged PBTD at 9211' MD, then PU & shot 40' of perforations as follows: Reperforated: 9145 - 9148' MD (Z1B) 9150 - 9165' MD (Z1B) 9171 - 9190' MD (Z1A) Ref. Log: BHCA. Added Perforations: 9148 - 9150' MD (Z1B) 9170 - 9171' MD (Z1A) Ref. Log: BHCA. Used 3-3/8" carriers & shot all perforations at 6 spf at 60 degree phasing w/well at overbalanced pressures. POOH w/perf guns. Noted all shots fired. Rigged down. Returned the well to Seawater injection & obtained a valid injection rate. AOGCC Individual Geological ~4aterials Well Inventory Page: 1 Date: 12/22/93 PERMIT # OPERATOR 91-143 ARCO CORE DATA T -- CHIPS C DATA_PLUS RUN SCALE DATE_RECVD 9073-9184,SS#825 02/13/1992 91-143 ARCO CORE CHIPS C 9096-9168,SS#825 06/10/1992 91-143 ARCO CORE ANALYSIS D 9073.1-9184.5 02/13/1992 91-143 ARCO BHCA/GR L 8724-9308 I 265 01/21/1992 91-143 ARCO CBT L 5695-9245 265 02/25/1992 91-143 ARCO CET L 5695-9245 5 02/25/1992 91-143 ARCO CNL/GR L 8446-9280 01/21/1992 91-143 ARCO DIFL/GR L 8724-9337 1 265 01/21/1992 91-143 ARCO GR/DIR L 8721-9073,DGWD 265 05/11/1992 91-143 ARCO GR/DIR L 8721-9073,DGWD, TVD 265 05/11/1992 91-143 ARCO HP/VPC-FMT-GR L 8775-9180 1 265 01/21/1992 91-143 ARCO INJP L 9050-9197 1 5 08/10/1992 91-143 ARCO INJP & STATIC L 8700-9190 5 10/19/1993 91-143 ARCO PERF L 8950-9210 1 5 02/25/1992 91-143 ARCO PITS L 8300-9200 1 5 04/30/1992 91-143 ARCO SSTVD L 8724-9337 1 162 01/21/1992 91-143 ARCO STATIC TEMP L 8700-9200 1 5 05/21/1992 91-143 ARCO 407 R COMP DATE:12/31/91 04/22/1992 91-143 CORE ANALYSIS R 9073.1-9184.5 09/03/1992 PERMIT # OPERATOR AOGC.. Individual Well Geological .Materials Inventory DATA T DATA_PLUS Page: 2 Date: 12/22/~3 RUN SCALE DATE_RECVD ARCO 91-143 ARCO CORE DESCRIPTION R SEE ANALYSIS 91-i43 ARCO DAILY WELL OP R 12/12/91-01/01/92 91-143 SURVEY SCHLUMBERGER R 0.00-9337 91-143 SURVEY SPERRY-SUN R BOSS GYROSCOPIC 91-143 5171 ARCO T 8648-9288,OH/FINAL 91-143 5202 ARCO T 8648-9288,OH/FINAL 91-143 5246 ARCO T 8600-9150~CH/DGWD Well Data Summary Section Dry ditch samples required and received?...yes ...no Cored intervals: - Description and analysis received...yes ...no ...not required Are well tests required and received?...yes ...no Well is in compliance. initial Comments 09/03/1992 04/22/1992 04/22/1992 04/27/1992 02/03/1992 03/12/1992 05/11/1992 ARCO Alaska. Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 104~-93 -1-11 ~~__2-12 ,4-14. e~_~4-15 .~-1 1 *~-~-7-8 11-25 11-28 ~4-24 e l -So 6-7 16-31 8-29-93 Prod Proflle/~l~le~ Run 1, 5" l~10~~ch 8-29-93 Prod Pro/tle/~aai~e~5 Run 1, 5" 8-29-93 ~od ~offie (~I¢a~~~~ 5" 9-7-93 ~j ~offie & S~cl~[~~~ 5" ~~Sch 9-7-93 ~j ~offie & S~flc]~'~'R~ 1~ 5"~o-t~ch 9-3-93 ~ul B~t T~P ~~R n L 5" ~q~- Sch 9-8-93 ~j ~offie & Sta~c 1~~~'' ~?~-a ,~ Sch 9-3-93 ~ B~t T~P R~ 1, 5"~-~v Sch 9-4-93 Pe~Record ~-~to~e R~ 1, 5" Sch 9-4-93 Pe~Record ~-.~ R~m 1, 5" Sch 9-10-93 ~uc~on~ai~l~e R~ 1, 1"&5" ~ Sch~ 8-31-93 USIT (Cement) Color R~ 1, 5"~ 8-31-93 USIT (~sion) ~lor R~ 1, 5"t~l~q Sch 9- 2-93 ~ B~t ~P R~ 1, 5" ~ ~-- Schq%~ 9-10-93 ~od ~offie~O[~~ R~ 1, 5'~ Sch 8-29-93 ~od ~offie[~t~~ R~ 1, 5" ~o-~ Sch 9-5-93 · C~ l~-~~ R~ 1, 5" Sch 9-12-93 ~P ~%o R~ 2, 5" Sch 8-30-93 ~ Detecti~l~ R~ 1, 2" l~0-~ Sch 9-10-93 Pe~ Record 1 ~z~-~ R~ 1, 5" Sch 9-3-93 GR/CCL (TCP ~e-~) R~ 1, 5" ~~ 9-5-93 ~ ~/aeml~[~/e~ R~ 1, 1"&5" 9-7-93 ~ ~ ~- ~~ R~ 1, l"&5" Sch 9-4-93 Pe~ Record %~o R~m 1, 5" Sch RECEIVED BY__~ '~ Have A Nice Dayi Sonya ATO-1529 # CENTRAL FILES # CI4RVRON # CLINT CHAPMAN # EXXON # MOBIL the attached copy u receipt of data. Ap p R OVED__~~/__ Trans# 93109 WELL FILF~ # BPX # STATE OF ALASKA The correct top logged interval for this log is 12,900 feet. The correct top logged interval for this log is 10,400 feet. ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 8-17-92 REFERENCE: ARCO CORE DATA ANALYSES & PHOTOS: / ~ _>~{;~2C,~ '×-.~-9-90 ~ / 2-29A ~/~6-17-90 ~4-42 2-18-92 5-36 v/ 10-4-91 · &&~,,~ I,,v~ Core Analysis Rpt. 51 ~m ~s~ Rpt. ( ~ ~cludes ~skette) ( ~ ~cludes ~skette) 9596'-9681' Arias 9 G'~3:-9 i85' -~Aila~ 9073'-9185' Atlas 10430'- 10509' Aths Please sign and return the attached copy as receipt of data. RECEIVED BY ~ Have A Nice Day! ~ Sonya Wallace APPROVED ATO- 1529 Trans# 9218~~ CENTRAL FILES # CHEVRON D&M # EXT. EXPL. # EXXON MARATHON # MOBIL PtHL~ PB WELL FILES R&D BPX STATE OF ~KA ~CO REC£1VED SEP 0 S ~99~ Alaska Oit & G~s Cons. Commission Anchorage OR ARCO ALASKA, INC. CORE ANALYSIS REPORT DS 4~42 PRUDHOE BAY UNIT NORTH SLOPE, ALASKA CL FILE NO. BP-3-1452 RECEIVED SEP 0 3 1992 Performed by- /[laska Oil & Gas Cons. Commission Anchorage Core Laboratories 8005 Schoon St. Anchorage, AK 99518 (907) 349-3541 Final Report Presented February 18, 1992 Date~ These analysis, opinions or interpretations are based on observations and materials supplied by the client to whom, and for whose exclusive ar, d confidentia[ use, this report is made. The interpretatio~s or opinions exF.'essed represent thebest judgement of Core Laboratories (al, errors ar~J omissions excepted); but Core Laboratories and it's officers and en~[oyees assume no responsibility ar~J make no warranty of representation as to the pr~uctivity, proper operations, profitability of any oiL, gas or other mineral well or formation in connection with which such report is used or relied upon. INTRODUCTION Core Laboratories was requested to perform a core analysis study on behalf of Arco Alaska, Inc. for samples recovered from the DS 4-42 well from the North Slope, Alaska. Presented herein are the results of this study. iConventional cores cut with a bland mud were processed on site by Arco personnel. A service description and methodology are presented in section 1. The core analysis results and lithological descriptions for the horizontal plug samples are presented in section 2. A statistical summary and plots for the horizontal plug samples are in section 3. Section 4 contains vertical plug sample core analysis results and lithological descriptions. Vertical plug sample statistics and plots can be found in section 5. Section 6 contains copies of shipping and receiving transmittals. In conjunction with the report, the tabular results of the analysis are supplied on an IBM PC compatible diskette. We sincerely appreciate this opportunity to be of service and hope these data prove beneficial in the development of this reservoir. TABLE OF CONTENTS Section 1 CONVENTIONAL CORE ANALYSIS, SERVICE DESCRIPTION Field Procedures Conventional Core Processing Core Photographs Special Considerations Bedding Study Laboratory Procedures Analytical Procedures and Quality Assurance, Horizontal Plugs Analytical Procedures and Quality Assurance, Vertical Plugs HORIZONTAL PLUG SAMPLE TABULAR RESULTS HORIZONTAL PLUG SAMPLES, STATISTICAL DATA AND PLOTS Statistical Summary Crossplot, Permeability vs Porosity Histogram, Porosity Histogram, Permeability Histogram, Grain Density Composite Core Analysis Log VERTICAL PLUG SAMPLES, TABULAR RESULTS VERTICAL PLUG SAMPLES, STATISTICAL DATA AND PLOTS Statistical Summary Crossplot, Permeability vs Porosity Histogram, Porosity Histogram, Permeability Histogram, Grain Density TRANSMITTALS DATA DISKETTE SECTION CONVENTIONAL CORE Field Procedures Conventional coring equipment in conjunction with a bland mud drilling fluid was used to extract 2 5/8 inch diameter core samples during December of 1991. The core was preserved using the aluminum inner core barrels. The barrels were marked and cut into three foot sections, and the open ends were covered with rubber capped and clamped. These aluminum barrel sections were then shipped to Core Laboratories' Anchorage facility. Conventional Core Processing i Upon arrAval at Core Laboratories Anchorage facility, the core barrels were placed in depth order, and surface core gamma logged. The core sections were removed from the aluminum sections, fit together, oriented, depth marked and double striped to maintain proper orientation. Horizontal and vertical plug points were then designated by Arco personnel. The plugs were then drilled, using brine as a coolant, and trimmed into right cylinders. The plug ends were placed in plastic bags and boxed. Upon completion of the plugging, the core was slabbed into two third and one third library sections, with appropriate depths being marked on both. One set of state chips were taken from the two third sections of cores 1 and 9. Both the one third and two third slabbed sections were then boxed according to depth. Core Photographs The two-third slabbed section of the cores were photographed. Approximately 15 feet of core appears in each photograph. Seven sets of visible spectrum flash light and four sets of ultraviolet light photographs appear in separate binders. Bedding Study A bedding study was performed on the core. Results of the study will be included in a separate report. Special Considerations The aluminum inner barrels containing the core samples were allowed to stand for a period of five days before plug poin~.s were chosen by Arco. This may have effected the water saturations. Laboratory procedures Dean-Stark Fluid Saturation Measurements Water was extracted from the samples by Dean-Stark technique using toluene. Samples were removed from the Dean-Stark and placed in toluene for hydrocarbon extraction aminimum of one day, or until no fluorescence was visible. Extracted samples were dried in a convection oven at 240 degrees F. for a minimum of 24 hours, and cooled in a desiccator to room temperature before porosity and permeability was measured. Saturations by Dean-Stark methods were calculated using Equations I and 2. Where' So : [((W1 - W2 - H20)/Do)/Vp] x 100 (1) Sw: [H20/Vp] x 100 So = Oil Saturations, Percent Sw = Water Saturation, Percent W1 : Natural Weight W2 = Extracted and Dried Weight H20: Extracted Water, Density Assumed 1.0 gm/cc Do : Density of Oil ~. : Pore Volume (2) Grain Density ~ Grain volume determinations were measured on all samples according to Boyle's Law utilizing the Extended Range Helium Porosimeter. Grain densities were calculated using Equation 3. Dg : Mg/Vg (3) Where: Dg = Grain Density Vg = Grain Volume Mg = Grain Mass Atmospheric Porosity All of the plug samples were measured for bulk volume by mercury displacement at ambient conditions. Porosity was calculated using Equation 4. P : [(VD-Vg) / Vb)] x 100 (4) Where: P: Porosity, Perrent Vb: Bulk Volume Vg : Grain Volume Atmospheric Permeability to Air Horizontal a~d vertical permeabilities were measured in a Hassler type core holder at a confining pressure of 400 psig. Permeability calculations were performed as defined by Darcyts Equation for compressible fluids, Equation 6. Pa x v x 1000 Qa x L x L K= x ...... ..... (5) i (P1 - P2)(P1 +P2) Vb 2 Where- K = Permeability v = Gas Viscosity P1 - P2 = Differential Pressure P1 + P2 2 = Mean Pressure Pa = Atmospheric Pressure Qa = F1 ow Rate L = Length Vb: Bulk Volume J j ! J i ) ) i I ! Company Hell : ARCO ALASKA, INC. : DS 4-42 HORIZONTAL PLUGS ANALYTICAL PRO CORE C E D U RE HANDLING & CLEANING Core Transportati on Solvent Extraction Equipment Extraction Time Drying Equipment Drying Time Drying Temperature : AIR FREIGHT : TOULENE : DEAN-STARK : 48 HOURS : CONVECTION OVEN : 24 HOURS : 240 DEGREES C. LABORATORIES Field Formation I I I S AND : PRUDHOE BAY UNIT : IVISHAK Q UA L I TY A S S U ANALYSIS I i I ) File No.: BP-3-1452 Date : 17-FEB-g2 R A N C E ......... .?:~,~:~ Grain volume measured by Boyle's Law in a matrix cup using He Bulk volume by Archimedes Principle Water saturations by Dean Stark Oil saturations by weight difference in Dean Stark Permeabilities measured on 1.0 in. diameter drilled plugs Core Gan~na Composite Dean Stark grain densities clean, dry solid mineral phase are measured Dean Stark porosity assumes oil & water measured constitute total pore space Company Well ] ) I I ! I ) ARCO ALASKA, INC. DS 4-42 VERTICAL PLUGS ANALYTICAL ROC CORE EDUR I I I ) ! LABORATORTES Field .' PRUDHOE BAY UNIT Formation .' ISHIVAK ES AND QUALITY ! I 1 I ! File No.: BP-3-1452 Date : 17-FEB-g2 ASSURANCE HAIIDLING & CLEANING ANALYSIS Core Transportation Solvent Extraction Equipment Extraction Time Drying Equipment Drying Time Drying Tenl3erature AIR FREIGHT TOULENE DEAN-STARK 48 HOURS CONVECTION OVEN 24 HOURS 240 DEGREES C. Grain volume measured by Boyle's Law in a matrix cup using He Bulk volume by Archimedes Principle Water saturations by Dean Stark Oil saturations by weight difference in Dean Stark Permeabilities measured on 1.0 in. diameter drilled plugs Dean Stark grain densities clean, dry solid mineral phase are measured Dean Stark porosity assumes oil & water measured constitute total pore space CORE LABORATORIES Company : ARCO ALASKA, INC. Well .- DS 4-42 HORIZONTAL PLUGS Location : 34-11N-15E UR, Fr NE cot 1374'S 1311'W (BHL) Co,State : NORTH SLOPE, ALASKA Field : PRUDHOE BAY UNIT Formation .. IVISHAK Coring Fluid '. BLAND MUD Elevation : CORE ANALYSIS RESULTS File No.: BP-3-1452 Date : 17-FEB-g2 API No. : Analysts: PLB,DJS I SATURATION SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc CORE 1 9073.0 - 9090.6 FEET , 1 1 9073.1 22.3 16.4 16.8 10.5 2.92 SS-ltgy,vf-fgr,pred vfgr,vwsrtd,wk lam, sbrnd,vwcmt,qtz,wh cmt. I 2 9074.0 254. 28.3 13.8 27.6 2.64 SS-ltgy,f-mgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cht,tr lith gr. I 3 9075.0 368. 29.2 14.5 29.2 2.54 SS-ltgy,f-mgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cht,tr lith gr. i 4 9076.0 331. 29.2 13.G 31.5 2.64 SS-l~gy,f-n~jr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cht,tr lith gr. I 5 9077.0 329. 29.1 14.9 31.9 2.64 .SS--~tgy,f-mgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cht,tr lith gr. I G 9077.9 131. 25.3 18.2 33.9 2.64 SS-ltgy,vfsd-fpbl,modsrtd,sbang,modcmt,qtz,wh cht,lith gr. I 7 9079.3 278. 25.9 14.5 35.0 2.64 SS-ltgy,f-mgr,pred fgr,wsrtd,sbrnd,modcmt,qtz,wh cht,tr lith gr. 1 8 9080.2 261. 25.4 17.3 42.0 2.63 SS-ltgy,fsd-fpbl,pred modsrtd,sbrnd,modcmt,qtz,wh cht,wh cmt. I 9 9081.5 410. 29.9 9.6 55.8 2.64 SS-ltgy,fsd-fpbl,pred modsrtd,sbrnd,modcmt,qtz,wh cht,wh cmt. 1 10 9082.4 358. 28.2 14.2 24.8 2.64 SS-ltgy,f-mgr,pred mgr,wsrtd,rnd,modcmt,qtz,wh cht. 1 11 9082.9 280. 28.4 5.8 33.4 2.64 SS-ltgy,f-cgr,pred ff~jr,wsrtd,rnd,modcmt,qtz,wh cht. 1 12 9083.4 439. 29.0 18.6 25.7 2.64 SS-ltgy,f-mgr,pred mgr,wsrtd,rnd,modcmt,qtz,wh cbt. i 13 9084.0 365. 21.9 23.1 44.6 2.64 SS-ltgy,f-n~jr,pred n~jr,wsrtd,rnd,modcmt,qtz,wh cht. I 14 9084.6 250. 29.3 14.2 35.3 2.64 SS-ltgy,m-vcgr,pred n~jr,wsrtd,sbrnd,modcmt,qtz,wh cht. I 15 9085,4 309. 26.0 19.2 42.4 2.63 SS-ltgy,fsd-mpbl,pred msd,psrtd,sbang,modcmt,qtz,wh cht,lith pbl. 1 16 9085.9 264. 29.7 13.6 28.2 2.64 SS-ltgy,mgr,vwsrtd,sbrnd,wcmt,qtz,wh cly gr,wh cbt. I 17 9086.9 419. 30.4 13.9 29.4 2.65 SS-ltgy,f-mgr,pred mgr,vwsrtd,sbrnd,modcmt,qtz,wh cht. I 18 9087.9 225. 28.6 13.8 34.0 2.64 SS-ltbrngy,mgr,vwsrtd,sbrnd,modcmt,qtz,ltgy cly. 1 19 9088.9 289. 29.7 15.7 32.1 2.64 SS-ltbrngy,mgr,vwsrtd,sbrnd,modcmt,qtz,wh cht,tr lith gr. 1 20 9089.8 0.01 5.4 13.5 11.0 3.14 SS-ltbrngy,f-vcgr,pred mgr,modsrtd,sbang,vwcmt,qtz,wh cht,carb cmt,pyr. CORE 2 9096.0 - 9152.8 2 I 9096.3 48.0 19.9 20.2 13.7 2.64 SS-ltbrngy,f-vcgr,pred fgr,bnd,sbrnd,wcmt,qtz,lith gr,ltbrn cly. 2 2 9097.1 173. 23.6 17.5 26.1 2.64 SS-ltgy,f-cgr,pred mgr,wsrtd,sbrnd,wcmt,qtz,wh cbt .... , , , . .. I - I . I i I ] I I I I t I I I CORE LABORATORIES Company : ARCO ALASKA, INC. Well : DS 4-42 HORIZONTAL PLUGS CORE Field Formation A N'~A L y S I S : PRUDHOE BAY UNIT : IVISHAK RESULTS File No.: BP-3-1452 Date : 17-FEB-g2 · ........... sATDRATION .............. SAMPLE DEPTH PERMEABILITY POROSITY - GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc · .......... m ........................... 2 3 9098.1 23.4 17.9 17.9 29.2 2.66 SS-ltgy,f-vcgr,pred fgr,~dsrtd,sbrnd,wcmt,qtz,wh cht,cly len. 2 4 9098.7 54.9 22.5 16.8 29.9 2.65 SS-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,vwcmt,qtz. 2 5 9099.3 0.33 12.1 23.8 3.4 2.66 SS-vltgy,vf-fgr,pred vfgr,vwsrtd,lam, rnd,vwcmt,qtz,tr lith gr. 2 6 9100.2 827. 28.8 18.5 60.4 2.64 SS-ltgy,f-cgr,pred mgr,wsrtd,sbang,wcmt,qtz,.~h cht,tr lith gr. - 2 7 9101.0 994. 29.0 20.1 63.1 2.64 SS-ltgy,f-n~jr,pred rngr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr lith gr. 2 8 9101.9 55.9 23.2 18,4 21.5 2.66 SS-ltgy,vf-~mjr,pred vfgr,wsrtd,sbrnd,wcmt,qtz,occ wh cht. 2 9 9102.9 3.76 19.4 22.2 8.6 2.70 SS-ltgy,vfgr,vwsrtd,sbrnd,vwcmt,qtz,tr lith gr. 2 10 9103.7 0.02 4.2 24.1 20.7 2.88 SS-ltgy,vfgr,vwsrtd,sbrnd,vwcmt,qtz,sid bnds,tr pyr. 2 11 9104.5 31.5 22.1 18.5 15.1 2.69 SS-ltgy,vfgr,vwsrtd,sbrnd,vwcmt,qtz,tr lith gr. 2 12 9105.1 47.6 23.1 17.8 19.8 2.65 SS-ltgy,vfgr,vwsrtd,sbrnd,vwcmt,qtz,tr lith gr. 2 13 9106.0 234. 27.1 19.2 41.6 2.64 SS-ltgy,f-mgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht. 2 14 9106.9 157. 24.4 20.0 32.7 2.70 SS-ltgy,f-mgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr dkgy cmt. 2 15 9107.9 297. 27.2 20.3 43.7 2.66 SS-ltgy,f-n~jr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht. 2 16 9109.0 439. 27.8 23.6 51.7 2.64 SS-ltgy,f-mgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht. 2 17 9109.9 630. 28.4 24.3 59.3 2.64 SS-ltgy,f-mgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht. 2 18 9111.1 762. 28.8 24.0 56.4 2.64 SS-ltgy,f-mgr,pred mgr,vwsrtd,sbrnd,wcmt,qtz,wh cht. 2 19 9111.9 909. 29.3 25.4 60.4 2.64 SS-ltgy,f-mgr,pred mgr,vwsrtd,sbrnd,wcmt,qtz,wh cbt. 2 20 9112.6 61.6 23.1 19.6 21.7 2.65 SS-ltgy,f-mgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cht,wh cmt. 2 21 9113.0 5.90 15.2 27.G 9.5 2.64 SS-ltbrngy,f-mgr,pred fgr,vwsrtd,wk lam, rnd,vwcmt,qtz,wh cht,occ bit. 2 22 9114.1 49.5 21.8 19.8 19.1 2.63 SS-ltgy,vf-nxjr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,occ bit. 2 23 9115.0 46.1 22.1 20.1 17.0 2.63 SS-ltgy,f-mgr,pred fgr,wsrtd,rnd,wcmt,qtz,wh cht,occ bit. 2 24 9116.3 206. 26.1 18.4 37.7 2.64 SS-ltgy,f-mgr,pred fgr,vwsrtd,sbrnd,modcmt,qtz,wh cbt. 2 25 9117.3 109. 24.3 17.9 28.5 2.64 SS-ltgy,f-mgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht. 2 26 9117.9 237. 26.0 18.4 38.0 2.64 SS-~l'tgy,f-mgr,pred fgr,vwsrtd,sb~nd,modcmt,qtz,wh cht. 2 27 9118.9 242. 26.7 19.0 37.G 2.64 SSL']tgy,f-mgr,pred fgr,vwsrtd,sbrnd,modcmt,qtz,wh cht. 2 28 9120.1 192. 26.0 20.0 34.4 2.64 SS-ltgy,f-~mjr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cbt. 2 29 9120.9 0.09 4.8 40.4 16.0 2.69 SLTST-nmjr,slt-vfsd,vwsrtd,wk lam,vwcmt,qtz,gy cly,wh mica,tr bit. 2 30 9121.7 416. 27.9 20.5 51.4 2.64 SS-ltgy,f-n~jr,prede n~jr,vwsrtd,sbrnd,wcmt,qtz,wh cht. 2 31 9122.2 300. 26.6 20.7 40.6 2.65 SS-ltgy,f-mgr,pred mgr,vwsrtd,sbrnd,wcmt,qtz,wh cht. , , , -, , I -2 Company : ARCO ALASKA, INC. Well : DS 4-42 HORIZONTAL PLUGS CORE I I I I ) I CORE LABORATORIES Field : PRUDHOE BAY UNIT Formation : IVISHAK ANALYSIS RESULTS I I I I File No.: BP-3-1452 Date .' 17-FEB-g2 SATURATION SAMPLE DEPTH PERMEABILITY POROSITY . . . GRAIN DESCRIPTION NUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 2 32 9123.0 76.9 23.2 21.4 21.6 2.64 SS-ltgy,vf-mgr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,tr bit. · 2 33 9123.9 153. 24.7 20.1 30.4 2.65 SS-ltgy,f-mgr,pred fgr,vwsrtd,sbrnd,wcmt,qtz,wh cht,tr bit. 2 34 9124.9 170. 23.4 19.6 29.5 2.63 SS-ltgy,fgr,vwsrtd,rnd,modcmt,qtz,whcht,occ bit. ' 2 35 9125.5 48.6 21.7 9.6 31.6 2.63 SS-ltgy,fgr,vwsrtd,wk lam,sbrnd,modcmt,qtz,wh cht,bit. 2 36 9126.0 24.8 19.0 24.2 17.9 2.63 SS-ltgy,fgr,vwsrtd,wk lam,sbrnd,modcmt,qtz,wh cht,bit. 2 37 9127.6 34.6 21.3 21.6 15.6 2.65 SS-ltgy,fgr,vwsrtd,wk lam, sbrnd,modcmt,qtz,wh cht,bit. 2 38 9127.9 9.46 12.5 22.2 10.9 2.97 SS-ltgy,vf-fgr,pred vfgr,sbrnd,vwcmt,qtz,wh cht,tr bit. 2 39 9128.0 55.6 22.2 19.4 17.8 2.66 SS-ltgy,vf-fgr,pred vfgr,sbrnd,vwcmt,qtz,wh cht,tr bit. 2 40 9129.1 23.3 19.3 22.3 19.4 2.65 SS-ltg¥,vf-fgr,pred vfgr,wk lam,wsrtd,sbrnd,wcmt,qtz,wh cht,bit. 2 41 9129.4 0.02 2.5 32.0 12.3 3,12 SS-ltbrngy,vf-fgr,pred fgr,vwsrtd,sbrnd,vwcmt,qtz,wh cht,sid cmt. 2 42 9130.1 0.04 4.6 38.8 16.5 2.67 SS-mgy,slt-fsd,pred vfsd,wsrtd,sbrnd,vwcmt,qtz,wh mic,occ bit 2 43 9131.2 0.02 4.7 29.0 17.5 2.72 SS-mgy,slt-msd,pred vfsd,wk lam,wsrtd,sbrnd,vwcmt,qtz,occ bit. 2 44 9132.2 0.10 8.4 37,2 0.3 2.70 SS-mltgy,vfgr lam/bit,wsrtd,sbrnd,wcmt,qtz,bit,tr pyr. 2 45 9133.1 0.94 13.1 27.8 5.5 2.68 SS-ltgy,vfgr lam/bit,w~rtd,sbrnd,wcmt,qtz,bit,tr wh cht. 2 46 9133.9 89.3 22.8 19.7 32.9 2.68 SS-ltgy,vf-mgr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,tr bit. 2 47 9134.9 186. 24.3 19.3 35.9 2.69 SS-ltgy,vf-mgr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,tr bit,tr pyr 2 48 9136.0 397. 26.8 20.5 45.3 2.64 SS-ltgy,fgr,vwsrtd,rnd,wcmt,qtz,wh cht. 2 49 9137.0 515. 26.9 22.9 47.3 2.65 SS-ltgy,fgr,vwsrtd,rnd,wcmt,qtz,wh cht. 2 50 9138.0 337. 26.2 19.0 37.6 2.65 SS-ltgy,f-mgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cbt. 2 51 9139.0 551. 27.7 22.7 57.1 2.64 SS-ltgy,f-mgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cbt. 2 52 9140.5 0.43 5.5 21.1 23.8 3.26 MDST-ltbrngy,vhd,bnd,brit,occ bit,pyr bnd,sid-cmt. 2 53 9140.9 342. 27.1 26.9 41.9 2.64 SS-ltgy,vf-mgr,pred fgr,vwsrtd,rnd,modcmt,qtz,wh cht,tr lith gr, 2 54 9141.9 265. 26.4 23.1 22.4 2.64 SS-ltgy,vf-n~jr,pred fgr,vwsrtd,rnd,modcmt,qtz,wh cht,tr lith gr. 2 55 9143.0 270. 25,9 23.3 40.6 2.65 SS-ltgy,vf-n~jr,pred fgr,vwsrtd,rnd,modcmt,qtz,wh cht,tr lith gr. 2 56 9144.0 310. 26.6 23.0 44.5 2.65 SS-ltgy,vf-mgr,pred fgr,vwsrtd,rnd,modcmt,qtz,wh cht,tr lith gr. 2 57 9145.0 163. 24.4 11.4 37.0 2.65 SS-ltgy,vf-mgr,pred n~jr,wsrtd,sbrnd,wcmt,qtz,wh cht,tr bit. 2 58 9145.9 181. 25.0 22.3 30.1 2.65 SS-ltgy,vf-fgr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,tr bit. 2 59 9147.0 229. 26.3 21.2 34.5 2.65 SS-ltgy,vf-fgr,pred fgr,wsrtd,rnd,wcmt,qtz,wh cht,blk lith gr. 2 60 9147.9 170. 24.6 23.3 32.2 2.65 SS-ltgy,vf-~jr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,tr bit. .... ! -3 I I I ! Company : ARCO ALASKA, INC. Well : DS 4-42 HORIZONTAL PLUGS I I ! i I I i CORE CORE LABORATORIES Field : PRUDHOE BAY UNIT Formation : IVISHAK ANALYSIS RESULTS I I I File No.: BP-3-1452 -'~i::,i Date : 17-FEB-g2 .......... SATURATION ............. SAMPLE DEPTH PERMEABILITY POROSITY - GRAIN ~ DESCRIPTION HUMBER (HORIZONTAL) (HELIUM) (PORE VOLUME) DENSITY Kair OIL WATER ft md % % % gm/cc 2 61 9149.0 231. 25.6 20.0 29.8 2.64 SS-ltg¥,vf-mgr,pred fgr,wsrtd,sbrnd,wcmt,qtz,wh cht,blk lith 2 62 9149.4 94.6 23.8 22.0 19.3 2.64 SS-ltgy,vf-fgr,pred fgr,wsrtd,sbrnd,mod cmt,qtz,occ wh cht,tr bit. 2 63 9150.0 63.8 23.0 21.1 18.5 2.66 SS-ltgy,vf-fgr,pred fgr,wsrtd,sbrnd,mod cmt,qtz,occ wh cht,tr bit. 2 64 9151.0 21.5 18.5 19.3 15.2 2.82 SS-ltgy,vf-fgr,pred fgr,wsrtd,sbrnd,vwcmt,qtz,wh cht,sid,tr pyr. 2 65 9152.0 38.3 22.0 19.5 14.8 2.66 SS-ltgy,vf-fgr,pred fgr,wsrtd,sbrnd,mod cmt,qtz,occ wh cht,tr bit. CORE 3 9156.0 - 9185.0 FEET $ i 9156.2 49.6 21.8 16.3 19.4 2.66 S$-ltgy,vf-f§r,pred fg~,vwsrtd,rnd,wcmt,qtz,wh cht,blk lith 3 2 9157.0 41.2 21.3 19.1 17.3 2.65 S$-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cht,blk lith 3 3 9158.0 39.3 20.7 19.4 13.7 2.75 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cht,blk lith 3 4 9159.0 G.63 14.9 21.7 4.8 2.89 Ss-ltgy,vf-fgr,pred fgr,vwsrtd,rnd,wcmt,qtz,wh cht,blk lith gr,tr pyr. 3 5 9160.1 11.1 18.5 26.4 3.9 .2.65 Ss-ltgy,vf-fgr,pred vfgr,vwsrtd,wk lam, rnd,wcmt,qtz,occ bit. 3 6 9161.1 0.01 4.8 18.1 21.3 2.82 Sltst-mltgy,mass,wk lam, vhd,occ blk .lith vfsd. 3 7 9161.G 0.50 13.5 29.5 2.4 2.70 Ss-ltgy,vfgr,f blk lith gr,wk lam,wsrtd,rnd,vwcmt,qtz,lith 3 8 9162.1 3.54 12.6 26.9 2.6 2.86 S$-ltgy,bnd f-vf§r,wsrtd,rnd,vwcmt,qtz,bit. 3 9 9162.4 0.07 4.7 14.8 31.9 2.67 Ss-mgy,vf-fgr,wsrtd,rnd,vwcmt,qtz,blk lith gr. 3 10 9163.0 0.02 4.G 32.9 18.2 2.69 Ss-mgy, slt-msd,pred vfgr,modsrtd,wcmt,qtz,9y cly,blk lith gr. 3 11 9163.5 0.12 11.4 30.1 3.6 2.76 Ss-mltgy,vfgr,vwsrtd,wk lam, rnd,vwcmt,qtz,blk lith gr. 3 12 9163.8 0.13 11.8 30.1 3.5 2.67 Ss-mltgy,vf9r,vwsrtd,wk lam, rnd,vwcmt,qtz,blk lith gr. 3 13 9164.2 0.03 5.0 25.7 23.3 2.67 Sltst-n~jy,slt-fsd,pred slt,wsrtd,rnd,vwcmt,qtz,gy cly,blk lith gr. 3 14 9164.7 0.08 11.7 33.5 2.2 2.64 Ss-mltgy,vfgr,vwsrtd, lam, sbrnd,wcmt,qtz,blk lith gr. 3 15 9165.4 0.83 14.3 28.2 0.6 2.63 Ss-ltgy,vfgr,lam c blk lith 9r,vwsrtd,sbrnd,wcmt,qtz. 3 16 9165.6 0.02 5.4 7.9 30.7 3.29 Sltst-mgy,slt,vwsrtd,vwcmt,qtz. 3 17 9165.9 0.32 5.2 17.6 19.3 3.45 Msdt-ltgy,mass,hd,tr bit,frac,pyr cmt. 3 18 9166.3 15.5 19.4 20.4 9.2 2.66 Ss-ltgy,vfgr,vwsrtd,rnd,wcmt,qtz,blk lith gr. 3 19 9166.9 1.21 19.6 23.2 7.6 ~2.73 Ss-ltgy,vfgr,vwsrtd,rnd,wcmt,qtz,blk lith gr,occ pyr. 3 20 9167.9 12.9 19.1 19.4 7.3 2.65 Ss-ltgy,vfgr,vwsrtd,rnd,wcmt,qtz,blk lith gr. 3 21 9168.5 0.13 12.0 31.3 5.2 2.65 Ss-ltbrngy,slt-msd,pred vfgr,wsrtd,rnd,wcmt,qtz,dk lith gr. i -4 Company Well ) ) ) J ) ) ) J ! ) ARCO ALASKA, INC. DS 4-42 HORIZONTAL PLUGS C OR CORE E ANA LABORATORIES Field Formation L Y S I S SAMPLE NUMBER DEPTH ft PERMEABILITY1 (HORIZONTAL) Kair POROSITY (HELIUM) SATURATION (PORE VOLUME) OIL WATER DENSITY r : PRUDHOE BAY UNIT · ' IVISHAK RESULTS File No.: BP-3-1452 Date : 17-FEB-g2 DESCRIPTION 3 22 9168.9 0.18 3 23 9169.7 2.87 3 24 9170.2 0.22 3 25 9170.6 1.50 3 26 9171.0 0.01 3 27 9171.2 1.97 3 28 9172.0 13.8 3 29 9173.0 47.6 3 30 9173.9 0.01 3 31 9174.1 35.1 3 32 9175.1 30.7 3 33 9176.0 22.8 3 34 9177.0 66.6 3 35 9178.1 0.12 3 36 9179.0 0.50 3 37 9180.0 0.01 3 38 9181.0 0.01 3 39 9181.8 0.89 3 40 9182.4 0.98 3 41 9183.0 0.01 3 42 9183.8 0.02 3 43 9184.5 0.05 12.8 29.7 6.5 16.7 22.2 5.7 7.0 19.4 16.2 15.3 26.3 5.9 5.8 21.0 15.2 15.5 24.0 7.5 18.5 21.0 15.1 21.1 18.4 22.7 3.0 40.1 0.8 22.0 17.7 20.0 21.0 17.9 17.5 19.8 20.4 14.0 22.1 41.2 28.1 7.3 17.3 22.1 14.8 29.3 6.4 5.2 21.6 19.7 5.8 13.5 22.7 14.8 29.0 6.4 13.6 30.0 6.1 6.3 22.2 13.1 5.3 14.1 24.9 5.3 53.9 0.6 2.65 2.65 ~2,79 2.63 3.14 2.56 2.59 2.70 3.87 2.64 2.65 2.73 2.69 2.66 2.63 2.84 2.66 2.63 2.63 2.69 2.67 2.69 Ss-ltgy,vfgr,vwsrtd,rnd,wcmt,qtz,blk lith gr. Ss-ltgy,vfgr,vwsrtdolam, rnd,wcm~,qtz,dk lith gr. Ss-ltgy,slt-csd,pred vfsd,modsrtd,sbrnd,wcmt,qtz,dk lith gr,pch cmt. Ss-ltgy,vfgr,vwsrtd,lam, rnd,wcmt,qtz,dk lith gr. Sltst-mltgy,mass,hd,vwcmt,occ blk lith sd gr. Ss-ltgy,vfgr,bnd f-c blk lith gr,rnd,wcmt qtz. Ss-ltgy,vfgr,bnd f-c blk lith gr,rnd,wcmt Ss-ltgy,vf-fgr,pred vfgr,wsrtd,sbrnd,wcmt Ss-ltbrngy,vfgr,pyr vn,vwsrtd,sbrnd,vwcmt Ss-ltgy,vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht Ss-ltgy,vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht Ss-ltgy,vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht qtz. qtz,blk lith gr. qtz,pyr. ,occ blk lith gr. .occ blk lith gr. .occ blk lith gr. Ss-ltgy,vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cht.occ blk lith gr,frac. Ss-ltbrngy,vfgr,wsrtd,wk, bnd,sbrnd,wcmt,qtz,blk lith gr. Ss~tbrngy,vfgr,vwsrtd,wk lam,sbrnd,wcmt,qtz,blk lith gr. Ss-mgy,vfgr,vwsrtd,sbrnd,wcmt,qtz,blk lith gr. Ss-mgY,vfgr,vwsrtd,sbrnd,wcmt,qtz,blk lith gr. Ss-ltbrngy,vfgr,vwsrtd,sbrnd,wcmt,qtz,blk lith gr,frac. Ss-ltbrngy,vfgr,vwsrtd,sbrnd,wcmt,qtz,blk lith gr. Ss-ltbrngy,vfgr,vwsrtd,sbrnd,wcmt,qtz,blk lith gr. Ss-mgy,vf-fgr,pred vfgr,wsrtd,sbrnd,wcmt,qtz,blk lith gr. Ss-mgy,vf-fgr,pred vfgr,wsrtd,lam,sbrnd,wcmt,qtz,blk lith gr. 1-5 : , J I t t i I Company Well .- ARCO ALASKA, INC. : DS 4-42 HORIZONTAL PLUGS i i i I I i CORE LABORATORIES Field Formation : PRUDHOE BAY UNIT : IVISHAK File No. BP-3-1452 ~,? ~, ~ Date i17-FEB'g2. ~:',-,~ii~iii;~;: ?;' TABLE I ZONE AND CUTOFF DATA ZONE: identification ......... NOT SPECIFIED Top Depth 9073.0 ft Bottom Depth 9184.5 ft Number of Samples ........ 127 DATA TYPE: Porosity (HELIUM) Permeability (HORIZONTAL) Kair UTOFFS: Porosity (Minimum) Porosity (Maximum) ....... Permeability {Minimum) --- Permeability (Maximum} --- Water Saturation (Maximum) Oil Saturation (Minimum) - Grain Density (Minimum) -- Grain Density (Maximum) -- Lithology Excluded 0.0 100.0 0.0000 100000. 100.0 0.0 2.00 4.00 NONE SUMMARY OF CORE DATA CHARACTERISTICS REMAINING AFTER CUTOFFS % % md md % % gm/cc gm/cc ZONE: Number of Samples ..... Thickness Represented - POROSITY: Storage Capacity Arithmetic Average .... Minimum Maximum Median ................ Standard Deviation .... GRAIN DENSITY: Arithmetic Average .... Minimum Maximum Median ................ Standard Deviation .... 127 127.0 ft 2480 7 ~-ft 195% 25% 304% 220% _+82% 2.71 gm/cc 2.56 gm/cc 3.87 gm/cc 2.65 gm/cc ±0.17 gm/cc PERMEABILITY: Flow Capacity ......... Arithmetic Average .... Geometric Average Harmonic Average Minimum ................. Maximum Median Standard Dev. (Geom) -- HETEROGENEITY {Permeability): Dykstra-Parsons Var. -- Lorenz Coefficient .... 18598.4 md-ft 146. -md 13.6 md 0.11 md -0;0 md 94. md 48.0 md K.IO±1'533 md ? 994. 0.908 0.520 AVERAGE SATURATIONS (Pore Volume): 20.2 % 28.3 % Oil ................... Water ................. Stat I- 1 ** i .~J N ~000.0 ~00.0 ~0.0 i.O O.Oi 0 Permeability vs. Porosity + + 35 ~8.0 i4.0 ~i. 0 Helium Porosity' % ARCO ALASKA. ZNC, DS 4-48 HORIZONTAL PLUGS PRUOHOE BAY UNIT i7-FEB- IVISHAK (go73-gts§ feet) Core Laboratories - LHGENO - IVISHAK ioo 9o 8o 70 6o 50 4o 3o 2o io 0 Porosity Histogram ioo ~/'t/ 70 ? / / / 8.0 i4.0 ~0.0 26.0 6O 5O 40 3O ~0 iO 0 3~.o Helium Porosity: u 'ARCO ALASKA. ZNC. DS 4-42 HORIZONTAL PLUGS PRUOHOE BAY UNIT IvISHAK (9073-9i85 fee~) Core Libarel:orle8 - LEGEND - --- Median Value ............ Arlth. Average (i9.5! ...... Cumulative Frequency .- Cumulatlye Capacity Loet i. E7 Salaple8 ~.00 Permeability H s og ram 90¸ 8O 7O 6O 5O 4O 3O EO '!0 0 .006 .O4 ~. 83 Hor&zon~al Permeab&lity E3. (Air) · md ARCO ALASKA. ]:NC. DS 4-4:3-- HORIZONTAL PLUGS PRUDHOE BAY UNIT IVISHAK (9073-9i85 feet) ~.7-FEB-gE / 1 / 1 / / I t / / 1 / - LEGEND - :!.00 9O 80 70 60 50 40 30 EO iO 0 ~.448. --- Hedlan Value (48.0) ............ Geom. Average (i3.6) ~Cumulatlve Frequency ...... CumuZatlve Capaclty Loot tE7 Seeplee ~] o F- O 0 iO0 9o 80 7O 6O 50 4O 3O 2O iO 0 2.50 Grain Dens y Histogram 2.70 2.90 3. iO 3'. 30 3.50 Grain Density: gm/cc __ ].00 9O 8O 7O :60 50 4O 3O · 2O iO 3.ilo ARCO ALASKA, ]:NC, DS 4-42 HORIZONTAL PLUGS PRUDHOE BAY UNIT IVISHAK (9073-9'...85 feet:) Core Labore~or ~ee i7-FE8-92 3.70 - LEGEND - Nedtan Value (2.65) ............ Artth. Average (2.7i! ~Cumulatlve Frequency i27 Samplee U DS 4-42: HORZZONTAL PLUGS PRUDHOE BAY UNZT ZVZSHAK (9073-9185 feet) Core Labort]tor lee 17-FEB-92 -- Llthology Legend - Si It=tone Vertical Scale 5.00 in - 100.0 ft Hudatone Core Gamma Horlz Kal r Depth . AP! 10010. O1 ,md 1oooI Feet · 9100 *'" ........ 0 · Helium Poro=l ty Cum. Curve Water Sat: X 400. Ol I Sat: X Grain Den 100 2.00 Sin/aa 4.00 ./ i I CORE LABORATORIES Company : ARCO ALASKA, INC. Field : PRUDHOE BAY UNIT Well : DS 4-42 VERTICAL PLUGS Formation : ISHIVAK Location : 34-11N-15E UR, Fr NE cor 1374'S 1311'W (BHL) Coring Fluid : BLAND MUD Co,State '. NORTH SLOPE, ALASKA Elevation : CORE ANALYSIS RESULTS File No.: BP-3-1452 Date : 17-FEB-g2 API No. : Analysts: PLB,DJS ...................... S^~UR^TI~N ....................... :' ' ,'];iII SAMPLE DEPTH PERMEABILITY POROSITY GRAIN DESCRIPTION NUMBER (HELIUM) (PORE VOLUME) DENSITY Kair · OIL WATER ft md % % % gm/cc , CORE I 9073.0 - 9090.6 : · I 3 9075.7 44.0 27,0 18.6 17.8 2.64 SS-ltgy,mgr, vwsrtd, rnd, cmt, qtz, wh cht. 1 10 9082.6 101. 28.0 15,7 20.9 2.64 SS-ltgy,f-mgr,pred ,gr,vwsrtd,sbrnd,wcmt,qtz,wh cht. I 19 9088.1 217. 29.6 16.0 24.3 2.64 SS-ltgy,f-mgr,pred mgr,vwsrtd,sbrnd,mo.dcmt,qtz,wh cht ............... CORE 2 9096.0 - 9152.8 · · 2 I 9096.7 7.95 20.9 32.5 0.2 2.64 SS-ltgy,vf-cgr,pred fgr,wsrtd,rnd,wcmt,qtz,ltgy cly,wh cht, 2 5 9099.5 0.02 8.2 33.5 0.7 2.66 SS-ltbrngy,vf-fgr,pred vfgr,wsrtd,lam,sbrnd,wcmt,qtz,tr lith gr. 2 9 9102.1 7.25 22.5 19.7 7.4 2.65 SS-ltgy,vf-fgr,pred vfgr,vwsrtd,sbrnd,wcmt,qtz,wh cbt. . 2 54 9141.1 219. 26.7 18.4 51.5 2.64 SS-ltgy,f-mgr,pred mgr,wsrtd,sbrnd,modcmt,qtz,wh cht. 2 57 9145.1 97.8 25.7 22.3 39.0 2.65 SS-ltgy,f-mgr,pred mgr,wsrtd,sbrnd,modcmt,qtz,wh cht. 2 59 9147.5 53.8 25.2 22.9 36.0 2.64 SS-ltgy,vf-mgr,pred fgr,wsrtd,sbrnd,w cht,qtz,wh cht. 2 64 9151.8 14.6 21.2 22.4 8.4 2.67 SS-ltbrngy,vf-fgr,pred vfgr,wsrtd,rnd,wcmt,qtz,occ lith gr. CORE 3 9156.0 - 9185.0 3 5 9160.2 0.07 7.2 55.0 0.0 2.59 SS-ltbrngy,vfgr,lam/blk lith gr,wsrtd,rnd,wcmt,qtz,lith gr. 3 7 9161.7 0.05 7.4 31.4 8.0 2.92 SLTST-mltgy,mass,vhd,occ blk lith,f-msd. 3 18 9166.7 9.70 19.5 19.9 9.1 2.69 SS-ltgy,vfgr,vwsrtd,rnd,wcmt,qtz,blk lith gr,tr pyr. 3 20 9167.6 0.95 16.9 23.7 3.3 2.64 SS-ltgy,vf-fgr,pred vfgr,wsrtd,rnd,wcmt,qtz,blk lith gr. 3 31 9174.3 17.1 21.5 18.0 21.2 2.64 SS-ltgy,vf-mgr,pred vfgr,wsrtd,rnd,wcmt,qtz,blk lith gr. 3 33 9176.7 44.1 21.7 19.1 36.0 2.70 SS-ltgy,vf-fgr,pred vfgr,wsrtd,rnd,wcmt,qtz,blk lith gr. 3 35 9178.6 0.14 13.5 31.3 2.4 2.64 SS~ltgy,vf-fgr,pred vfgr,wsrtd,rnd,wcmt,qtz,blk lith gr. 3 36 9179.8 0.01 5.4 32.8 4.0 2.85 S)-mgy,slt-fsd,pred vfsd,wsrtd,rnd,vwcmt,qtz,blk lith gr,tr wh cht.. 3 43 9184.1 0.02 8.5 40.3 0.6 2.66 SS-mgy,slt-fsd,pred vfsd,wsrtd,rnd,vwcmt,qtz,blk lith gr,tr wh cht. 1 - I i I ! J J I J Company Well : ARCO ALASKA, INC. : DS 4-42 VERTICAL PLUGS 1 CORE: 'j J i i i ) I LABORATORIES Field : PRUDHOE BAY UNIT File No.: BP-3-1452 ~ Formation : ISHIVAK Date : 17-FEB-g2 · ?:!- TABLE I CHARACTERIST_I_CS REMAINING AFTER CUTOF. F__S, : ZONE: PERMEABILITY: "'f Number of Samples ..... 18 Thickness Represented - 18.0 ft Flow Capacity .......... 835.0,md Arithmetic Average .... 46.4 !md POROSITY: Geometric Average ..... 4.53 i'md Harmonic Average ...... 0.09: ::md Storage Capacity 348.1 ~-ft Minimum ............... 0.01 ~md Arithmetic Average .... 19 3 % Maximum ............... 219. md Minimum 5 4 % Median ................ 12.2 md 29 6 % Standard Dev. (Geom) -- K-lO+-1'448 md 21.4 % ZONE AND CUTOFF DATA ZONE: Identification NOT SPECIFIED Top Oepth 9073.0 ft Bottom Depth 9184.1 ft Number of Samples 18 ATA TYPE: Porosity (HELIUM) Permeability (HORIZONTAL) Kair CUTOFFS: Porosity (Minimum) ....... Porosity (Maximum) ....... Permeability (Minimum) --- Permeability {Maximum) --- Water Saturation (Maximum) Oil Saturation (Minimum) - Grain Density (Minimum) -- Grain Oensity (Maximum) -- Lithology Excluded 0.0 100.0 0.0000 100000. 100.0 0.0 2.00 4.00 NONE % % md md % % gm/cc gm/cc Maximum Median Standard Deviation .... GRAIN DENSITY: Arithmetic Average .... Minimum Maximum ............... Median Standard Deviation .... +7.8 % 2.67 gm/cc 2.59 gm/cc 2.92 gm/cc 2.64 gm/cc ±0.08 gm/cc HETEROGENEITY (Permeability): Dykstra-Parsons Var. -- Lorenz Coefficient .... 0.915 0.592 AVERAGE SATURATIONS (Pore Volume): Oil ......... Water ................. 20.1% oo iO00.O Permeability vs. Porosity iO0.O iO .0 i.O O.i O.Oi iO.O i5.0 20.0 25.0 Helium Porosity: ARCO ALASKA, INC, DS 4-42 VERTICAL PLUGS PRUDHOE BAY UNIT ISHIVAK (9073-9i84 feet) Core Leboretortee 17-FEB-92 - LEGEND - ISHIVAK 30 _. m tOO ~o~. 30~ i ~.0 Porosity Histogram ~-/// i i i i I i3.0 t7.0 8t.0 i I I I 25.0 89.0 Helium Porosity: X 0 3-'1.0 iO0 9O 80 80 ~ ~o w EO m iO ARCO ALAOKA. ]:NC, 4-48 VERTICAL PLUGS PRUDHOE BAY UNIT ISHIVAK (9073-9i84 feet) t7-FEB-g2 - LEQEND - ~- Median Value ............ Artth. Average ~Cumulattva Frequency -- -- - Cueulettve Capacity Loaf ia 6amplem t00 gO o 1, !, .005 . O~ Permeability .09 .35 t.4t Ver~lca! Permeabll l~y Histogram · 8. 23. (Air) · md ~00 90 BO 70 60 50 40 30 20 t0 0 ARCO ALASKA. ZNC, DS 4-42 VERTZCAL PLUGS PRUDHOE BAY UN/T ZSHZVAK (g073-9i84 feet) 17-FEB-gE - LEGEND - ............ geom. Avermge Cumu2mttve Frequency cumuZmt~vm Capacity Lomt i8 Bump/em ~00 gO ~0 70 iO Srain I t 1 I Density Histogram / 2.70 2.80 2. gO iO0 BO 70 ~0 40 ,10 20 iO 0 3.00 Grain Density: gm/cc ns ,4-4a VERTICAL PLUGS PRUDHOE BAY UNIT :r~HZVAK (9073-giB4 fee~) t7-FEB-g2 - LEOEND - ------- Neaten Ve~uo (2.84J ............ Arith. Average (2.87J ~Cumule~ive Frequency tO Bampiee ARCO .,x]~ska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 7-31-92 REFERENCE: ARCO CASED HOLE FINALS 2-11 ??-~3 7-14-92 Prod Profile Run 1, 5" * 2-23ST~2-/~o 7-14-92 Prod Profile (Flexstak) Run 1, 5" ~/-/~ 2-35 7-13-92 Leak Detect Run 1, 2~' 3-7 ~z/-J-.~ 7-6-92 Inj Profile Run 1, 5" 3-10 ~.~/ 7-7-92 Inj Profile Run 1, 5" 3-14 ?f~- 7-10-92 Prod Profile Run 1, 5" 4-25 ~-~/~ 7-5-92 Static Temp Run 1, 5" ~/'/~-~ 4-42 7-5-92 Inj Profile/Temp Run 1, 5" 5-3 ~f/-p~.~. 7-6-92 Prod Profile Run 1, 5" 9-2~-~/~ 7-4-92 Prod Profile (Flexstak) Run 1, 5" 9-27 ~0~'_~ 7-10-92 Leak Detect Run 1, 5" 9-29~¢'--/?~ 7-7-92 Prod Profile Run 1, 5" 9-36~J'-.~-~ 7-5-92 Prod Profile Run 1, 5" 12-2 ?~- 7-14-92 Inj Profile Run 1, ~' 12-23 ~P ~/-~ 7-14-92 Inj Profile Run 1, ~' ~a~2~ 13-23A 7-4-92 Inj Profile Run 1, 5" °2 -~/ 13-25 7-7-92 Inj Profile Run 1, 5" ~P'-J'/ 14-2 7-11-92 Gas Entry Run 1, 5" ~4--~/~16-18 7-11-92 Prod Profile (Flexstak) Run 1, 5" Please sign and return the attached copy as receipt of data. RECEIVED BY Have A Nice Day! Sonya Wallace ATO-1529 APPROVED Trans# 92167 C~h-nco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco /? # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL The correct well name is 2-23ST. # PHILLIPS PB WELL FILES R&D # BPX # STATE OF TEXACO RECEIVED AUG 1 0 1992 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Post Office Box 100360 Anchorage Alaska 99510-0360 Telephone 907 276 1215 SAMPLE TRANSMITTAL TO: State of Alaska DATE: 09 JUNE, 1992 Oil & Gas Conservation Comm. AIRBILL #: AL 511983 3001 Porcupine Dr. AFT#: 2-06-09-~(~ Anchorage, Ak. 99501 CHARGE CODE# 18511 WELL: PBU 4-42 OPERATOR: Arco APl NO: SAMPLE TYPE: STATE CC NUMBER OF BOXES: I 9096' 9097' 9098' 9122' 9142' 9148' 9168' THESE SAMPLES ARE SUBMITTED FOR EARLIER SAMPLES THAT WERE DEEMED INADEQUATE. THESE SAMPLES ARE AT LEAST ONE CUBIC INCH. SENT BY: D. L. Przywojski UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND MAIL A SIGNED COPY OF THIS FORM TO: RECEIVED ArcoAlaska, Inc. P. O. Box 100360 Anchorage, AK. 99510 Attn: D. L. Przywojski ABV-100 ARCO Alaska, Inc. is a Subsidiary of Atlantic Richfield Company ARCO Alaska. Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 5-15-92 REFERENCE: -~tl--~/ 2-9 2~ 2-18 ~Z-~o? 2-26 ?/--~8 2.31 ~- V~ '3-1----~ 2~/ 3-13 ~/-~ 4-3~ ?/~/~ ~ 4-40 ~/~/ff~ 4-42~ ~-~ 6-18~ Z~ 7~ 9-3 ~ 7~")? 9-16 ~?~ ]~ ~9-17 /9-17 ~/~/~/ 11-6 ?o~'''5'° 14-1 ~/~/~- 15-1 ~/~! 16-6 ARCO CASED HOLE FINALS 3-25-92 Prod Profile R.n 1, 5" Camco 4-28-92 Prod Profile R.n 1, 5" Camco 3-25-92 Prod Profile R.n 1, 5" Camco 4-28-92 Prod Pr0t~le Run 1, 5" Camco 4-4-92 lnJ Profile R-n '1, 5" Camco 4-4-92 Inj Profile Run 1, 5" Camco 4-6-92 Prod Profile Run 1, 5" Camco 4-7-92 GR/CCL/Jewelry R-n 1, 5" Camco 4-27-92 Static Temperature R~m 1.5" Camco 3-31-92 PITS ~ Run 1.5" Camco 4-7-92 Prod Profile R~_m 1.5" Camco 3-25-92 Prod Profile R._n 1.5" Camco 4-25-92 InJ Profile R~_m 1.5,' Camco 4-11-92 Collar Run 1.5- Camco 4-16-92 InJ Profile R.n 1.5" Camco 3-27-92 Prod Profile Run 1.5" Camco 3-26-92 Leak Detect R-n 1, 5" ,Camco 3-31-92 Prod Prof/Leak Detect R-~ 1, 5" Camco 4-12-92 Jewelry Run 1, 5" Camco Please sign and return the attached copy as receipt of data. Have A Nice Dayl ~1 1992. Sonya Wallace APPROVED Aiasl~ii~'~s Cons. Commission ATO-1529 Trans# 92099' ~=''-A]'rchorage # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALAS~ TEXACO ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 5-1-92 REFERENCE: ARCO OPEN HOLE FINALS 4-42 / 12/2X~23/01 DGWD:. GR + Dir. Run 1, Please sign and return the attached copy as receipt of data. RECEIVED BY Have A Nice Day! Sonya Wallace AT0-1529 Sperry Sperry APPROVED ~'~ Gas Cons. Commi~~s# 9206~- Anchoraga # CENTRAL FILES # CHEVRON #D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILIPS # PB WELL FILES R&D # BPX # STATE OF ALASKA # TEXACO ARCO JLIAqkA, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 5-1-92 REFERENCE: , ARCO MAGNETIC TAPE(S) WITH LISTINGS .l l/~ · 141b. T~ff' 3-10'92 DIFL/CNL/BHCA/GR J~073 ,,~;(/} ** 4-42 / X2/2X-23/91 DGWD Jot~~XOX~ Please sign and return the attached copy as receipt of data. RECEIVED BY ~. Have A Nice Day! Sonya Wallace ATO- 1529 Atlas Sperry RECEIVED _ ~l~l~ii & Gas Cons. Commission APPROVED .]~1///~ Anchorage Trans# 9206 -7 CENTRAL FILES (CH) CHEVRON D&M DEDE SCHWARTZ (OH/GCT) EXXON MARATHON MOBIL # PHILLIPS PB WELL FILF~ R&D # BPX # STATE OF ALASKA TEXACO The correct APl# for 1-5ST is 50-029-20076-00. The correct APl# for 4-42 is 50-029-22229-00. ARCO Alask~ Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 4-27-92 REFERENCE: ARCO CASED HOLE FINALS 1-15 3-7 7~ ? 7 ~ 4-7ST 4-7ST 4-9 ~d'~' ~' ?~'~? 4-15 2-9-92 2-27-92 3-1-92 3-13-92 3-15-92 3-1-92 4-42 3-1-92 5-12 ??-/~/ 2-11-92 13 $°'~ 2-13-92 ~17 g~-?o 2-11-92 ~?~ d/ lTM 2-18-92 7-1 2-18-92 ?~- ~d 9-1 2-28-92 ~d~/d 9-2 2-8-92 ?~- ~? 9-18 3-14-92 ~-'-~'~ 9-27 2-7-92 ~ 1--~/d /9-31 2'8-92 Prod Prof R~_~n 1, 5" Camco InJ Profile R~m 1, 5" Camco Jewelry R!~n 1, 5" Camco Prod Prof R-n 1, 5" Camco InJ Prof Run 1, 5" Camco InJ Prof Run 1, 5" Camco PITS R.n 1, 5" Camco Prod Prof R~_m 1, 5" Camco Jewelry Run 1, 5" Camco Prod Prof Run 1, 5" Camco GR/CCL/Jewelry Run 1, 5" Camco Prod Prof Run 1, 5" Camco Prod Prof Run 1, 5" Camco Prod Prof Run I, 5" Camco Inj Prof R.n 1, 5" Camco Prod Prof Run 1, 5" Camco Prod Prof Run 1, 5" Camco Please sign and return the attached copy as receipt of data. RECEIVED BY ~_i~---C~ ~ C ~ !I~/.~~0 APPROVE~]~sk~'~a Cons. commission Trans# 9207~-7 Have A Nice Day! Sonya Wallace ATO-1529 # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL #PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXA~ * The correct well naxne for this log is 4-7ST. , ..... 0RIGINAI STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CO~wMISSION ~ WELL COMPLETION OR RECOMP LETION REPORT AND LOG , 1. Status of Well Classification of Service Well OIL [] GAS [] SLISPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number i ARCO Alaska, Inc. 91-143 i3. Address E~. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5o- 029-22229 4. Location of well at surface 9. Unit or Lease Name 567' FNL 457' FEL, SEC. 34, T11N, R15E ~;%;-i' ~::;~?-- ...... Prudhoe Bay Unit At Top Producing Inte~al :' ;:~': ~!'~--"- ' --~-~.' ........ ~"i 10. Well Number 1~7' FNL 1216' FEL SEC. 34 T11N R15E : ~ 'q: r~ ~ ~ ~'~ 11. Field and Pool ~ ,~ :_,_~~ Prudhoe Bay Field/Prudhoo Bay Pool 1498' FNL 1~5' FEL SEC. 34 T11N R15E ~ ................ ~, ~. 5. Elevation in feet (indicate KB, DF, etc.) ~6. Le~e Designation and Seri~ No. KBE= 50.09 ~ ADL 2~25 12. Date Spudded 13. Dae T.D. Re~d 14. Date Comp., Su~. ~ Aband. ~15. Water D~th, if offshore ~16. No. of Completions 12/1~91 12/26/91 12/31/91] N/A feet MSL ~ One 17. Total Depth (MD+TVD) 18. Plug Back D~th (MD+TVD} 19. Directional Survey ~20. Depth where SSSV set ~21. Thickness of Permafrost I 9337'MD 9090'~D 9246'MD 9011'~D ~ ~ ~ ~ 2178f~t MD ~ 1900' 22. Ty~ Electric or Oth~ L~s Run SR-CHT-DIFL-AC-CN; GR-CIBL ?CHT- TEMP-GR-RNFT 23. OASIS, LINER AND CEMENTI~ ~ ~ D~ MD CASING SIZE ~. ~R ~. G~DE T~ ~ ~E ~E C~~ R~D A~T ~LLED 30" 20" H-40 SURFACE 115' 13-1/2" ~.5~ J-55 SURFACE 3501' 17-1/2" 2734 cu fl Class G 9-7/~' 29. 7" L-80 SURFACE 8719' 12-1/4" 377 cu fl Class G ~[~ ~/4" 17~ CR13 8440' 9334' 8-1/2" 1~ cu fl Class G 24. Perorations open to Production (MD+TVD of T~ and ~ttom and 25. ~R~RD interval, size and number) · SIZE DEP~ SET (MD) PACKERSET Schlumberger 3-3/8 ~ 4spf 4-1/2" lA ~ 8419' 8365 MD ~Dss LBO B YC 9171 - 9190 8~ - 8952 26. ACID, F~C~RE, CEMENT ~UE~, ~C. 9150 - 91~ 8915 - 89~ DEPTH I~ERVAL (MD) A~UNT & KIND OF MATERIAL ~ 91~ - 91~ 8~ 7 - 8913 13-3/8 "X 9-5/8" Freeze prote~ annulus with 120 bbls d~ crude. 27. ~O~TDN TEST Date First Production lMethod of Operation (Flowing, gas lift, etc.) Feb. 1, 1992 I Fiowin~ Date of Test Hours Tested PROD~T~ FOR OIL-BBL GAS-~F WATER-BBL C~ES~E ~GAS-OIL RATIO TEST PERDD ~ I Flow Tubing Casing Pressure CALCU~TED~ OIL-BBL ~S-~F WATER-BBL OIL GRAVITY-APl (corr) Press. 24-~UR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fracture, apparent dips, and pr~ence of oil, gas or water. Submit ~re chips. RECEIVED ,Alaska 0il & Gas Cons. Commission Anchora~o Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE j. 30. GEOLOGIC MARKERS i-~'riMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 8752 8539 Base Sadlerochit 9190 8952 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~" ~~~"~[ Title AroaDri//ingEnginee..r Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item28: If no cores taken, indicate"none". Form 10-407 Cons. Commission Anchorar.je PRUDHOE BA~ DRILLING D, S, 4-42 PRUDHOE BAY ALASKA COMPUTATION DATE: 1/ 8/92 ANCHORAGE"ALASKA II I G I N L ¢/'' DATE OF JRVEY: 12/23/91 BOSS GYROSCOPIC SURVEY JOB NUMBER: AK-MW-lO109 KELLY BUSHING ELEV, = 59,00 FT. OPERATOR: BAERTSCH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/IO0 NORTH/SOUTH EAST/WEST SECT, 0 ,00 -59,OO 461 461,00 402,00 972 971,99 912.99 1474 1473,98 1414.98 1978 1977,96 1918,'96 0 0 N ,00 E 0 6 N 84,30 W 0 24 N 61.80 E 0 18 N 84,50 E 0 42 N 30.80 E .00 ,OON ,OOE ,00 .02 ,04N ,40W ,25 ,10 .93N .73E -1,17 ,03 1.88N 3,58E -3,84 ,11 4.65N 6,47E -7,84 2482 2481,84 2422,84 1 36 N 50.00 E 2986 2985,67 2926,67 2 17 S 25,20 E 3472 3471.43 3412,43 1 6 S 4,30 E 3972 3971.31 3912,31 1 23 S 1,70 E 4472 4471.21 4412,21 0 42 S 7,50 W ,19 11,82N 13,44E -17,84 ,62 7,19N 23,14E -21,27 ,27 6.29S 27,64E -14,73 ,06 17,18S 28,18E -7,29 ,14 26,31S 27,96E -.59 4947 4946,19 4887,19 0 18 S 20,00 E 5288 5287,18 5228,18 0 42 S 18,40. E 5539 5538,03 5479,.03 3 17 S 65,10 W 5728 5726,18 5667,18 7 18 S 61,80 W 5915 5910,83 5851,83 10 48 S 60,20 W ,10 30,36S 28.01E 2.28 ,12 33,17S 28.97E 3.63 1,31 37.67S 22,90E 11.09 2,12 45,64S 7,38E 27.62 1,88 59.96S 18,30W 55,78 6105 6096,04 6037,04 14 53 S 54,00 W 6294 6276,02 6217,02 20 30 S 50,70 W 6579 6540,53 6481,53 23 12 S 47,90 W 6891 6826,54 6767,54 23 53 S 46.80 W 7237 7142,38 7083,38 24 17 S 43,00 W 2,27 83,18S 53,53W 96,97 3,01 118,45S 98.84W 153,84 1,02 187,71S 179,12W 259,45 · 26 272,18S 270.79W 383,91 · 46 372,22S 370,44W 525.10 7549 7426.17 7367,17 24 47 S 43,50 W ,17 7830 7684.13 7625.13 21 53 S 43.70 W 1.03 8146 7977,22 7918.22 22 0 S 43.80 W ,03 8462 8272.19 8213.19 20 0 S 43,30 W. ,64 8644 8443.80 8384,80 18 53 S 43,70 W ,61 466.64S 459,26W 654,71 547.29S 536,05W 766.07 632,61S 617,73W 884.19 714,66S 695,76W 997.41 758.62S 737,47W 1058,00 -8776 8568,49 8509,49 19 23 S 43.70 W ,38 8868 8655,50 8596.50 18 30 S 43,70 W ,98 8963 8745,27 8686,27 19 42 S 43,70 W 1.26 9047 88-24,42 8765,42 19 23 S 43,70 W .36 789,93S 767,39W 1101,30 811.53S 788,03W 1131.18 834,00S 809,50W 1162.26 854.32S 828.92W 1190,37 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 1190,37 FEET AT SOUTH 44 DEG. 8 MIN, WEST AT MD = 9047 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 224,14 DEG. ;ICROFILMED RECEIV£O Alaska Oil & Gas 6o~s. PRUDHOE BAY DRZLLZNG D.S. 4-42 PRUDHOE BAY ALASKA COMPUTATZON DATE: 1/ 8/92 ANCHORAGE ALASKA DATE OF ~URVEY' 12/23/91 JOB NUMBER" AK-MW-lO109 KELLY BUSHZNG ELEV. = OPERATOR' BAERTSCH 59,00 FT, ZNTERPOLATED VALUES FOR EVEN 10OO FEET OF MEASURED DEPTH . TRUE SUB-SEA TOTAL MEASD VERTZCAL VERTZCAL RECTANGULAR COORDZN'ATES MD-TV DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DZFFERENC D VERTZCAL E CORRECTZON 0 .00 -59.00 .00 N .00 E ,0 1000 999,99 940,99 1,02 N ,90 E ,0 2000 1999,96 1940,96 4.88 N 6,61 E ,0 3000 2999,66 2940,66 6,68 N 23,37 E .3 4000 3999,30 3940,30 17.86 S 28,20 E ,7 0 1 ,01 4 .03 4 .30 0 ,36 5000 4999,19 4940,19 30,62 S 28,10 E ,8 6000 5994.06 5935,06 68,99 S 33,00 W 5,9 7000 6926.19 6867,19 302.41 S 302,99 W 73,8 8000 7841,85 7782,85 593.14 S 579,88 W 158,1 9000 8780,10 8721,10 843,02 S 818,12 N 219,9 1 ,11 4 5,14 1 67,86 5 84.34 0 61.75 9047 8824,42 8765,.42 854,32 S 828.92 N 222.58 2.68 THE CALCULATZON PROCEDURES ARE BASED ON THE USE OF MZNZMUM CURVATURE METHOD. ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE ,. , · PRUDHOE BAY '" DS 4-42 AK NABORS 28E SURF DRIL: 0.5 OTHR: 8.0 12/12/91 ( 1) DRILLING MW: 8.7 VIS:250 TD: 136' ( 136) MOVE RIG FROM 4-'40 - 4-42. ACCEPT RIG ON 4-42 AT 2130 HRS. SUPV:LP N/U DIVERTER, RISER. FLOWLINE & JET LINES. MIX MUD.C/O HOLE ANGLE:18 54 KELLYS. P/U BHA SPUD AT 0530 HRS. 12-DEC-91. DRILL FROM 110 - 136'. DAILY:S46,315 CUM:$46,315 ETD:S46,315 EFC:$2,497,400 SURF DRIL: 24.0 12/13/91 ( 2) TD: 3060' (2924) SUPV:LP HOLE ANGLE:18 54 DRILLING DRILLING FROM 136 TO 3060' MW: 9.2 VIS:270 DAILY:S65,542 CUM:$111,857 ETD:S111,857 EFC:$2,497,400 12/14/91 ( 3) TD: 3518' ( 458) SUPV:LP HOLE ANGLE:18 54 SURF DRIL: 3.0 TRIP: 6.0 CIRC: 3.0 CASG: 11.0 OTHR: 1.0 N/D SURFACE BOPE MW: 0.0 VIS: 0 DRILL FROM 3060 TO 3518' CIRCULATE HOLE CLEAN. POOH. RIH~CBU. DROP SS SURVEY. PUMP PILL. POOH FOR 10-3/4 CASING. L/D BHA. R/U TO RUN CASING. RIH W/10-3/4 CASING. CIRC & COND MUC FOR CMT JB. PUMP 100 BBLS WATER SPACER PUMP 415 BBLS AS-III LEAD CEMENT SLURRY. PUMP 72 BBLS CLASS G TAIL S'~URRY. PUMP 50 BBLS WATER, 58 BBLS AS-1 FOR TOP JOB. 15.0 SLURRY. R/D TOP JOB PIPE, WASH OUT CMT LINES, L/D LANDING JT. START TO N/D.BOPE DAILY:S68,828 CUM:$180,685 ETD:S180,685 EFC:$2,497,400 P1 DRIL: 6.5 TRIP: 1.5 EVAL: 2.0 CASG: 1.0 BOPE: 10.5 OTHR: 2.5 12/15/91 ( 4) DRILLING MW: 8.9 VIS: 38 TD: 4327' ( 809) TEST BOPE. RIH. CBU. TEST CASING TO 3000 PSI. DRILL FC & SUPV:LP CEMENT. CIRC. TEST CASING TO 3000 PIS. DRILL TO 4327' HOLE ANGLE:18 54 DAILY:S220,841 CUM:$401,526 ETD:S401,526 EFC:$2,497,400 P1 DRIL: 14.5 TRIP: 5.5 CIRC: 1.0 OTHR: 3.0 12/16/91 ( 5) DRILLING MW: 9.6 VIS: 41 TD: 5430' ( 1103) DRILL TO 4515'. CBU. SHORT TRIP TO CASING SHOE. DRILL TO SUPV:LP 5331' CBU. DROP SS SURVEY, PUMP PILL, POOH. RIH. DRILL TO HOLE ANGLE:18 54 5430' DAILY:S83,280 CUM:$484,806 ETD:S484,806 EFC:$2,497,400 P1 DRIL: 24.0 12/17/91 ( 6) TD: 6938' (1508) SUPV:LP HOLE ANGLE:18 54 DRILLING DRILLING FROM 5430 - 6938'. MW: 9.6 VIS: 45 DAILY:S70,533 CUM:$555,339 ETD:S555,339 EFC:$2,497,400 P1 DRIL: 16.5 TRIP: 5.0 SURV: 0.5 CIRC: 0.5 OTHR: 1.5 12/18/91 ( 7) ..,DRILLING IN 9-7/8 HOLE MW: 9.8 VIS: 45 TD: 7660' ( 722) DRILL TO 6987' CIRC. PUMP PILL. POH FOR BIT CHANGE. RIH SUPV:BM .. TO 6987' DRILL TO 7660' HOLE ANGLE:18 54 DAILY:S45,956 CUM:$601,295 ETD:$6~l,295 EFC:$2,497,400 RECEIVED Alaska Oil 8, Gas Cons. Commissior~ Anchorage ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE PRUDHOE BAY DS 4-42 AK NABORS 28E P1 DRIL: 22.0 TRIP: 2.0 12/19/91 ( 8) DRILLING AHDEAD IN 9-7/8 HOLE MW: 9.8 VIS: 43 TD: 8290' ( 630) DRILLING TO 8290'. SUPV:BM HOLE ANGLE:18 54 DAILY:S69,098 CUM:$670,393 ETD:S670,393 EFC:$2,497,400 P1 DRIL: 13.0 TRIP: 8.5 SURV: 0.5 CIRC: 1.5 OTHR: 0.5 12/20/91 ( 9) POH L/D 5" DP MW: 9.8 VIS: 43 TD: 8724' ( 434) DRILLING TO 8383' POH. RIH TO 8223'. DRILLING TO 8724'° SUPV:BM POH. L/D 5" DP HOLE ANGLE:18 54 DAILY:S57,928 CUM:$728,321 ETD:S728,321 EFC:$2,497,400 P1 TRIP: 4.0 CIRC: 4.0 CASG: 10.5 BOPE: 5.5 12/21/91 (10) TEST BOPE. MW: 9.8 VIS: 44 TD: 8724' ( 0) POOH. L/D BHA. TEST BOPE. RIH W/ 7-5/8" CSG. CIRC. CMT SUPV:BM CSG PER PROGRAM. NO BUMP PLUG. L/D LAND JT. INSTALL HOLE ANGLE:18 54 PACKOFF. TEST SAME. INJECT 200 BBLS MUD DN ANNULUS. TEST BOPE. DAILY:S219,344 CUM:$947,665 ETD:S947,665 EFC:$2,497,400 .. P1 DRIL: 5.5 TRIP: '8.~5'~ CASG~' 1.5 BOPE: 1.0 PROB: '7.5 PROB CODE: EFC 12/22/91 (11) CURC. · MW: 9.3 VIS: 33 TD: 8724' ( 0) TEST BOPE. RIH W/ BHA. 'REPAIR DRAWWORKS. RIH. WASH F/ SUPV:BM 8564'-8615' CIRC. TEST CSG. DRLG CMT, FC TO 8710' HOLE ANGLE:18 54 CIRC. DAILY:S102,723 CUM:$1,050,388 ETD:S1,050,388 EFC:$2,497,400 PROD DRIL: 16.0 TRIP: 3.0 CIRC: 1.5 EVAL: 0.5 OTHR: 3.0 12/23/91 (12) P/U CORE BBLS. MW: 9.3 VIS: 40 TD: 9073' ( 349) DRLG CMT, FS, 10' NEW HOLE. CBU. LOT (11 PPG EMW). DRLG SUPV:BM F/ 8734'-9073'. CIRC. POOH FOR CORE BBLS. M/U CORE BBLS. HOLE ANGLE:18 54 DAILY:S48,561 CUM:$1,098,949 ETD:S1,098,949 EFC:$2,497,400 PROD DRIL: 10.5 TRIP: 8.5 RIGS: 1.0 CIRC: 1.0 OTHR: 1.5 PROB: 1.5 PROB CODE: TH 12/24/91 (13) CUT CORE #2. MW: 9.3 VIS: 39 TD: 9156' ( 83) RIH W/ CORE BBL. REAM F/ 8991'-9073' CORE #1 F/ SUPV:BM 9073'-9096' CORE BBL JAMMED CORE ~3' RECOVER 17 6' HOLE ANGLE:18 54 .~RIH W/ CORE BBL #2. CORE #2 F/ 9096' 9156' DAILY:S78,368 CUM:$1,177,317 ETD:$1,177,~17 EFC:$2,497,400 PROD DRIL: 9.5 TRIP: 9.5 CIRC: 1.0 OTHR: 3.5 PROB: 0.5 PROB CODE: TH 12/25/91 (14) TD: 9187' ( 31) SUPV:ZR HOLE ANGLE:18 54 j. RIH W/ BHA. MW: 9.3 VIS: 40 POOH W/ CORE #2. CORE F/ 9096'-9156' CORE 60' RECOVER 58.8' L/D CORE #2. RIH W/ CORE BBL ~3. REAM F2 9116'~9156' CBU. CORE F/ 9156'-9187'. POOOH. L/D CORE BBL #3. CUT 31' RECOVER 29' RIH W/ BHA #7. DAILY:S93,454 CUM:$1,270,77[ ETD:S1,270,771 EFC:$2,497,400 ACTIVITY SUMMARY BP/AAI SHARED SERVICE PRUDHOE BAY NORTH SLOPE DS 4-42 AK NABORS 28E PROD DRIL: 17.5 TRIP: 4.0 SURV: 0.5 CIRC: 1.0 PROB: 1.0 PROB CODE: TH 12/26/91 (15) POOH FOR LOGS. MW: 9.2 VIS: 43 TD: 9337' ( 150) RIH W/ BHA #7. REAM F/ 9070'-9187' DRLG F/ 9187'-9337' SUPV:ZR TD WELL @ 02:30 HRS, 12/26/91. CIR~. SHORT TRIP TO SHOE. HOLE ANGLE:18 54 CBU. POOH. DAILY:S45,759 CUM:$1,316,530 ETD:S1,316,530 EFC:$2,497,400 PROD TRIP: 6.5 CIRC: 1.0 EVAL: 16.5 12/27/91 ( 16) POOH TO RUN LNR. MW: 9.2 VIS: 43 TD: 9337' ( 0) POOH. R/U ATLAS. LOG RUN #1: SR/CHT/DIFL/AC/CN. LOG RUN SUPV:LP #2: GR/CIBL. LOG RUN #3: CHT/TEMP/GR/RFT. R/D ATLAS. RIH HOLE ANGLE:18 54 W/ BIT. WASH 45' TO BTM. CBU. POOH. DAILY:S30,902 CUM:$1,347,432 ETD:S1,347,432 EFC:$2,497,400 RCSG: 24.0 12/28/91 (17) TD: 9337 PB: 9337 SUPV:LP RIH. MW: 9.3 WBM POOH. RIH W/ 5-1/2" LNR. CIRC. RIH W/ LNR ON DP. CIRC. PUMP 50 BBLS PREFLUSH, 24 BBLS CMT. DISP W/ 20 BBLS 17 PPG HIGH VIS PILL, 53 BBLS MUD. BUMP PLUG W/ 3000 PSI. SET HGR. RELEASE F/ HGR. SET DN & SET PKR. REV OUT CMT. POOH 15 STDS. FLUSH FLOWLINE. POOH. L/D BHA. P/U BHA'.' DAILY:~$r~3,478''' CUM:$1,490,910 ETD:S1,490,910 EFC:$2,497,400 12/29/91 (18) TD: 9337 PB: 9246 SUPV:LP RCSG: 14.5 LPRF: 8.5 PROB: 1.0 PROB CODE: EFS LOG W/ SWS. MW: 8.5 Seawater RIH. TAG TOL @ 8431' RIH. WASH F/ 9218'-9246' CBU. TEST LNR, LNR' LAP. OK. PUMP 200 WATER, 60 BBLS HIGH VIS SWEEP, 900 BBLS SEAWATER. DISP. TEST LNR LAP. OK. POOH. L/D BHA. R/U SWS. LOG RUN #1: CET/CBT. LOG R/U GYRO. TOOL FAIL. LOG RUN #2: GR/JB. DAILY:S56,475 CUM:$1,547,385 ETD:S1,547,385 EFC:$2,497,400 NDNU: 0.5 RPKR: 13.0 RCMP: 2.0 · LPRF: 5.5 PROB: 3.0 PROB CODE: EFS 12/30/91 (19) RIH W/ PBR, 4-1/2" TBG. MW: 8.5 Seawater TD: 9337 LOG RUN #3: GYRO. TOOL FAIL. C/O TOOL. LOG RUN: GYRO. PB: 9246 R/D SWS. M/U PKR, 4-1/2" TAIL ASS'Y. RIH ON DP. SET PKR @ SUPV:LP 8363'. TEST ANNULUS. RELEASE K-ANCHOR. POOH. L/D DP. TEST BOPE. RIH W/ 4-1/2" TBG, PBR, SEAL ASS'Y. DAILY:S48,796 CUM:$1,596,181 ETD:S1,596,181 EFC:$2,497,400 NDNU: 8.0 RCMP: 14.5 PROB: 1.4 PROB CODE: WH 12/31/91 (20) TEST TREE. MW: 8.5 Seawater TD: 9337 RIH W/ 4-1/2" TBG, SSSV. LATCH K-ANCHOR INTO PKR. SHEAR PB: 9246 OUT PBR. M/U TBG HGR. TEST CNTRL LINES. PUMP 100 BBLS SUPV:LP DIESEL DN TBG. LAND TBG. TEST TBG, ANNULUS. OK. SHEAR BALL. L/D LAND JT. SET BPV. N/D BOPE. N/U TREE. TEST PACKOFF. TEST TREE. ATTEMPT TO PULL TEST PLUG. N/D TREE. FISH METAL. N/U TREE. TEST TREE. ,.,DAILY:S329,099 CUM:$1,925,280 ETD:S1,925,280 EFC:$2,497,400 ACTIVITY SUMMARY BP/AAI SHARED SERVICE PRUDHOE BAY NORTH SLOPE DS 4-42 AK NABORS 28E NDNU: 1.5 01/01/92 (21) TD: 9337 PB: 9246 SUPV:LP RIG RELEASED @ 07:30 HRS. MW: 8.5 Seawater TRY TO PULL TEST PLUG. NO GO. WILL PULL AFTER RIG GONE. RIGH RELEASED @ 07:30 HRS, 12/31/91. DAILY:S11,030 CUM:$1,936,310 ETD:S2,497,400 EFC:$1,936,310 PRUDHOE BAY D.S. 4-42 PRUDHOE BAY ALASKA CONPUTATION DRILLING DATE: 1/ 8/92 ANCHORAGE ALASKA DATE OF oURVEY: 12/23/91 JOB NUNBER: AK-HW-10109 KELLY BUSHING ELEV, = OPERATOR: BAERTSCH 59.00 FT, INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH. HEASD DEPTH TRUE SUB-SEA VERTICAL VERTICAL DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST ND-TVD VERTICAL DIFFERENCE CORRECTION 0 59 159 259 359 .00 -59,00 59.00 ,00 159.00 100,00 259.00 200,00 359.00 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .00 N .00 E .00 .00 .00 N .05 W .00 .00 .02 N .22 W .00 .00 459 559 659 759 859 459,00 400.00 559,00 500.00 659,00 600,00 759,00 700.00 859.00 800,00 · 04 N .40 W .00 .00 .06 N .57 W .00 .00 ,07 N .74 W .00 .00 ,22 N .58 W .00 ,00 .55 N .03 E .00 .00 959 1059 1159 1259 1359 959,00 900..00 1059.00 1000,00 1159,00 1100.00 1259,00 1200.00 1359,00 1300,00 ,88 N .65 E ,01 ,00 1,21 N 1.26 E ,01 ,00 1,54 N 1,88 E ,01 ,00 1,77 N 2,46 E ,01 ,00 1,82 N 2,98 E ,02 ,00 1459 1559 1659 1759 1859 1459.00 1400,00 1559.00 1500,00 1659,00 1600,00 1759.00 1700,00 1859,00 1800.00 1.87 N 3.50 E 1.92 N 4.02 E 1.97 N 4.54 E 2.35 N 5.10 E 3.40 N 5,73 E ,02 ,00 ,02 ,00 ,02 .00 ,02 .00 ,03 .01 1959 2059 2159 2259 2359 1959,00 1900.00 2059.00 2000.00 2159,00 2100,00 2259.00 2200.00 2359,00 2300.00 4.45 N 6.35 E 5.50 N 6.98 E 6.55 N 7.6O E 7.82 N 8.67 E 9.61 N 10.81 E ,04 .01 .04 ,01 ,05 .01 ,07 .02 .11 .04 2459 2559 2659 2759 2859 2459,00 2400.00 2559.00 2500.00 2659.00 2600.00 2759,00 2700,00 2859.00 2800,00 11,41 N 12,95 E 12.88 N 15.06 E 13,31 N 17.09 E 12,66 N 19.04 E 10,93 N 20.90 E .15 .04 .18 ,03 ,20 .02 .22 .02 .26 ,03 2959 3059 3159 3259 3359 2959.00 2900,00 3059.00 3000,00 3159.00 3100,00 3259,00 3200,00 3359.00 3300.00 8.12 N 22.68 E 4,53 N 24,39 E ,89 N 26,10 E 2.22 S 27.33 E 4,13 S 27,48 E .31 .06 .39 .08 .47 .08 .53 .06 .55 PRUDHOE BAY DRILLING D.S. 4-42 PRUDHOE BAY ALASKA COHPUTATION DATE: 1/ ANCHORAGE ALASKA DATE OF ~URVEY' 12/23/91 8/92 JOB NUNBER' AK-NW-10109 KELLY BUSHING ELEV, = OPERATOR' BAERTSCH 59,00 FT, INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL NEASD VERTICAL VERTICAL RECTANGULAR COORDINATES ND-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 3459 3459,00 3400,00 6,05 S 27,62 E ,57 3559 3559.00 3500,00 7,96 S 27,76 E ,59 3659 3859.00 3600,00 9,88 S 27,91 E ,61 3759 3759.00 3700,00 11,99 S 28,02 E ,63 3859 3859,00 3800,00 14,43 S 28,10 E ,66 ,02 ,02 ,02 .02 ,03 3959 3959,00 3900,00 16,88 S 28,17 E ,69 4059 4059,00 4000,00 19,32 S 28,24 E ,72 4159 4159,00 4100,00 21,76 S 28,31 E ,75 4259 4259.00 4200.00 23.74 S 28.30 E ,77 4359 4359.00 4300.00 24.95 S 28.14 E ,78 ,03 ,03 ,03 ,02 ,01 4459 4459,00 4400,.00 26,16 S 27,98 E ,79 4559 4559,00 4500,00 27,37 S 27,82 E ,79 4659 4659,00 4600,00 28,58 S 27,66 E ,80 4759 4759,00 4700,00 29,43 S 27,67 E ,81 4859 4859,00 4800,00 29,93 S 27,85 E ,81 .01 ,01 ,01 .01 .00 4959 4959,00 4900,00 30,42 S 28,03 E ,81 5059 5059,00 5000,00 30,91 S 28,21 E ,81 5159 5159,00 5100,00 31,68 S 28,48 E ,81 5259 5259,00 5200.00 32,84 S 28,86 E ,82 5359 5359,00 5300,00 34,13 S 28,67 E ,83 .00 .00 ,00 .01 ,01 5459 5459,00 5400,00 35,91 S 26,33 E ,88 5560 5559,00 5500,00 38,22 S 21,73 E 1,01 5660 5659,00 5600,00 42,01 S 14,23 E 1,37 5761 5759,00 5700.00 47,72 S 3,52 E 2,11 5862 5859,00 5800,00 55,31 S 10,12 W 3,32 .04 ,14 ,36 ,74 1 ,21 5964 5959.00 5900,00 64,92 S 26,59 W 5,13 6066 6059,00 6000,00 77,63 S 45,76 W 7,75 6170 6159,00 6100,00 93,90 S 67,89 W 11,47 6275 6259,00 6'200.00 114,50 S 93,99 W 16,86 6382 6359.00 6300,00 138,75 S 123,21 W 23.83 1 .81 2.62 3,72 5,40 6,97 6~90 6459,00 6400.00 164.94 S 153,57 W 31,57 6599 6559,00 6500.00 193,02 S 185,00 W 40,09 6707 6659,00 6600,00 221,75 S 216,80 W 48,89 6817 6759,00 6700,00 251,69 S 248,98 W 58,13 6926 6859,00 6800.00 282,02 S 281,28 W 67,50 7.74 8.52 8.80 9.23 9.38 PRUDHOE BAY DRZLLZNG D.S. 4-42 PRUDHOE BAY ALASKA CONPUTATZON DATE: 1/ 8/92 ANCHORAGE DATE OF ~dRVEY: 12/23/91 JOB NUNBER: AK-MW-lO109 KELLY BUSHZNG ELEV, = OPERATOR: BAERTSCH 59,0O FT, ZNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA NEASD VERTZCAL VERTZCAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDZNATES NORTH/SOUTH EAST/WEST HD-TVD VERTZCAL DZFFERENCE CORRECYZON 7035 6959,00 6900,00 312,36 S 313,58 W 76,88 9.38 7145 7059,00 7000,00 344,69 S 344,76 W 86,52 9.63 7255 7159,00 7100,00 377,71 S 375,56 W 96.24 9,72 7364 7259,00 7200.00 410,73 S 406,35 W 105.96 9.72 7475 7359,00 7300,00 444,12 S 437,90 W 116,00 10,05 7585 7459,00 7400,00 477,54 S 469,61 W 126.11 10,10 7694 7559,00 7500,00 509,59 S 500,i0 W 135,46 9,35 7802 7659.00 7600,00 539,93 S 529,02 W 143,89 8,43 7910 7759.00 7700,00 569,05 S 556,85 W 151,69 7.81 8018 7859,00 7800,00 598,14 S 584,67 W 159,49 7.80 8126 7959.00 7900,.00 627,30 S 612,64 W 167,34 7.85 8234 8059,00 8000,00 656,46 S 640.60 W 175,20 7.85 8341 8159,00 8100,00 684,68 S 667.51 W 182,55 7.35 8447 8259,00 8200,00 711,17 S 692.47 W 188,96 6.42 8554 8359.00 8300,00 737,58 S 717,37 W 195,35 6.38 8660 8459,00 8400,00 762,39 S 741,07 W 201,07 5.72 8765 8559,00 8500,00 787,51 S 765,08 W 206,94 5,87 8871 8659,00 8600,00 812,37 S 788,84 W 212,69 5.75 8977 8759,00 8700,00 837,56 S 812,90 W 218,59 5,90 9047 8824,42 8765,42 854,32 S 828.92 W 222.58 3.99 THE CALCULATZON PROCEDURES USE A LZNEAR ZNTERPOLATZON BETWEEN THE NEAREST 20 FOOT ND (FRON RADZUS OF CURVATURE) POINTS ORIGINAL I I SUB - S URFA CE DIRECTIONAL SURVEY F~ UIDANCE ~ ONTINUOUS ~ OOL Company ARCO ALASKA, INC. iii i iiiii LI I Well Name , D.,S,. 4, T42 (56,7,'FN, I.,457,',FEL,SEC,, 3,4,T11N,R1,5,,E) Field/Location PRUDHOE BAY, NORTH SLOPE, ALASKA ii Job Reference No. CORRECTED 92001 LocKled By: M. MCBRIDE Date 29-DE6-1991 Computed By: R. KRUWELL I I I I II I II I II I I III I I I I I I I II I IIII I II I I I I II I II I I SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. D.S. 4-42 PRUDHOE BAY METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION: TANGENTIAL- LINEAR HORIZ. DIST. NORTH SLOPE, ALASKA SURVEY DATE: 29-DEC-1991 ENGINEER: M.MCBRIDE Averaged deviation and azimuth PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 43 DEG 36 MI N WEST COMPUTATION DATE: 6-JAN-92 PAGE 1 ARCO ALASKA, INC. D.S. ~-42 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 29-DEC-1991 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATE5 HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 100 O0 200 O0 300 O0 400 O0 500 OO 600 O0 700 O0 8O0 O0 900 O0 0 O0 100 O0 200 O0 300 O0 400 OO 500 O0 600 O0 700 O0 799 99 899 99 -60 O0 40 O0 140 O0 240 O0 340 O0 44O O0 540 O0 64O O0 739 99 839 99 0 0 N 0 0 E 0 3 S 3 43 W 0 2 S 83 t2 E 0 3 S 44 44 E 0 7 S 29 34 E 0 7 S 41 49 E 0 19 S 59 48 E 0 29 N 89 51 E 0 31 N 81 10 E 0 24 N 80 2 E 0 O0 001 0 03 001 0 08 0 11 0 10 -0 33 -0 98 -1 65 0.00 0.00 0.00 0.00 0.00 0.30 0.43 0.00 0.01 0.19 0.00 N 0.01 S 0.07 S 0 10 S 0 23 S 0 40 S 0 63'S 0 74 S 0 67 S 0 53 S 0.00 E 0.00 W 0 0.03 E 0 0.08 E 0 0.13 E 0 0.26 E 0 0.52 E 0 1.26 E 1 2,13 E 2 2.95 E 2 0 O0 N 0 0 E 01 S 3 16 W 08 S 2O 59 E 13 S 40 13 E 27 S 29 27 E 47 S 33 0 E 82 S 39 28 E 46 S 59 38 E 23 S 72 25 E 99 S 79 50 E 1000.00 999.99 939.99 0 21 1100.00 1099.99 1039.99 0 19 1200.00 1199.98 1139.98 0 17 1300.00 1299.98 1239.98 0 30 1400.00 1399.98 1339.98 0 33 1500.00 1499.97 1439.97 0 33 1600.00 1599.97 1539.97 0 31 1700.00 1699.97 1639.97 0 16 1800.00 1799.97 1739.97 0 23 1900.00 1899.96 1839.96 0 26 N 78 4 E N 81 35 E S 88 28 E N 88 55 E N 82 27 E N 75 26 E N 67 47 E N 54 45 E N 14 45 E N 5 45 E -2.16 -2.6O -2.97 -3.41 -4.09 -4.88 -5.75 -6.33 -6.81 -7.41 0.09 0.03 0.00 0.13 0.20 0.00 0.32 0.12 0.18 0.18 0.42 S 0.32 S 0.28 S 0.30 S 0.25 S 0.06 $ 0.24 N 0.51N 0,94 N 1.67 N 3 58 E 4 11 E 4 61 E 5 25 E 6 19 E 7 14 E 8 08 E 8.64 E 8.89 E 9.00 E 3.60 S 83 16 E 4.12 S 85 33 E 4'.61 S 86 28 E 5 26 S 86 45 E 6 20 S 87 41 E 7 15 S 89 30 E 8 09 N 88 19 E 8 66 N 86 36 E 8 94 N 83 57 E 9 15 N 79 30 E 2000.00 1999 96 1939.96 2100.00 2099 2200.00 2199 2300.00 2299 240O.OO 2399 2500.0O 2499 2600.00 2599 2700.00 2699 2800.00 2799 2900.00 2899 95 2039.95 94 2139.94 92 2239.92 88 2339 88 84 2439 84 80 2539 80 77 2639 77 73 2739 73 70 2839 70 0 29 0 46 1 3 1 24 1 37 1 39 1 36 1 26 1 3O 1 44 N B 41 E N 18 7 E N 28 26 E N 31 15 E N 39 17 E N 48 52 E N 63 35 E N 79 2 E S 87 17 E S 57 43 E -8 O3 -9 01 -10 53 -12 57 -15 23 -18 10 -20 85 -23 17 -25 02 -26 37 0 49 0 16 0 23 0 40 0 25 0 52 0 3O 0 29 0 38 1 38 2.44 N 3.52 N 5 O0 N 6 81 N 9 06 N 11 13 N ~2 68 N 13 52 N 13 71 N 13 03 N 9.08 E 9.36 E 10 02 E 11 08 E 12 58 E 14 55 E 16 91 E 19 39 E 21 89 E 24 56 E 9 41 N 74 59 E 10 11 13 15 18 21 23 25 27 O0 N 69 22 E 20 N 63 30 E O0 N 58 24 E 50 N 54 15 E 32 N 52 36 E t4 N 53 9 E 64 N 55 7 E 83 N 57 57 E 80 N 62 3 E 3000.00 2999 64 2939.64 3100 O0 3099 3200 O0 3199 3300 O0 3299 3400 O0 3399 3500 O0 3499 3600 O0 3599 3700 O0 3699 3800 O0 3799 3900 O0 3899 59 3039.59 55 3139.55 52 3239.52 49 3339.49 46 3439.46 45 3539.45 44 3639.44 43 3739.43 42 3839.42 1 57 1 39 1 38 1 24 1 22 1 6 0 50 0 45 051 0 59 S 37 59 E S 29 26 E S 28 59 E S 21 45 E S 14 22 E S 11 34 E S 7 37 E S 12 56 E S 7 15 E S 9 39 E -17 -26 19 -25 49 -24 65 -23 73 -22 53 -21 29 -20 40 -19 63 -18 BO 85 0.60 0.03 0.10 0.65 0.26 0.73 0.09 0.24 0.22 0.31 10.63 N 8.07 N 5.59 N 3.17 N 0.90 N 1.24 S 2.72 S 4.09 S 5.41 S 6.95 5 26.81 E 28.84 N 68 22 E 28.48 E 29.60 N 74 11 E 29.87 E 30.39 N 79 24 E 31.08 E 31.24 N 84 10 E 31.72 E 31.74 N 88 22 E 32.18 E 32.20 S 87 48 E 32.44 E 32.56 S 85 12 E 32.75 E 33.00 S 82 53 E 32.94 E 33.38 S 80 41 E 33.19 E 33.91 S 78 10 E COMPUTATION DATE: 6-JAN-92 PAGE 2 ARCO ALASKA, INC. D.S. 4-42 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 29-DEC-1991 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE NEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 3999 40 3939.40 4100 4200 4300 4400 4500 4600 4700 4800 4900 O0 4099 O0 4199 O0 4299 O0 4399 O0 4499 O0 4599 O0 4699 O0 4799 O0 4899 39 4039.39 38 4139.38 37 4239 37 36 4339 36 36 4439 36 35 4539 35 35 4639 35 35 4739 35 34 4839 34 1 1 S 6 28 E 0 52 S 7 31 E 0 51 S 1 58 E 046 S 7 4 E 0 38 S 0 46 W 042 S 0 38 E 0 31 S 5 31W 0 29 S 8 45 E 0 19 S 9 23 W 0 19 S 16 56 E -16.79 -15 73 -14 79 -13 88 -13 12 -12 26 -11 53 -10 82 -10 37 -9 90 0 29 0 11 0 26 0 09 0 08 0 O0 0 28 0 35 0 O0 0 44 8 68 S '10 35 S 11 76 S 13 16 S 14 28 S 1545 S !652 S 17 50 S 18 12 S 18 74 S 33 46 E 33 68 E 33 80 E 33 95 E 34 03 E 34 01 E 34 06 E 34 06 E 34 07 E 34 03 E 34.57 S 75 27 E 35.24 S 72 55 E 35.79 S 70 49 E 36.41 S 68 49 E 36.90 S 67 14 E 37.35 S 65 34 E 37.86 S 64 8 E 38.29 S 62 49 E 38,59 S 62 0 E 38.85 S 61 10 E 5000 O0 4999 34 4939 34 5100 O0 5099 34 5039 34 5200 O0 5199 33 5139 33 5300 O0 5299 33 5239 33 5400 O0 5399 32 5339 32 5500 O0 5499 29 5439 5600 O0 5599 08 5539 5700 O0 5698 49 5638 5800.00 5797.38 5737 5900.00 5895.71 5835 0 26 0 23 0 36 0 39 0 34 29 2 43 O8 4 32 49 7 27 38 9 51 71 10 58 S 2 15 W S 10 20 E S 22 3 E S 28 49 E S 26 18 E S 48 24 W S 64 41W S 57 4 W S 59 22 W S 59 53 W -9.50 -9.06 -8.57 -8.21 -7.94 -6.12 -0.05 10.30 24.62 42.04 0 01 0 38 0 02 0 57 0 62 4 39 2 43 1 26 2 48 0 86 19 32 S 20 04 S 2O 94 S 21 85 S 22 79 S 24 6O S 27 59 S 33 11S 40 96 S 49.97 S 34 07 E 34 18 E 34 42 E 34 84 E 35 45 E 34 71 E 29 05 E 19 83 E 7 32 E 8 48 W 39.17 S 60 27 E 39 62 S 59 37 E 40 41 42 42 40 38 41 50 29 S 58 41 E 12 S 57 55 E 14 S 57 16 E 54 S 54 40 E 06 S 46 28 E 59 S 30 55 E 61 S 10 8 E 68 S 9 38 w 6000.00 5993.77 5933 77 11 57 6100 O0 6090.95 6030 95 14 53 6200 O0 6186.9`4 6126 6300 O0 6281.61 6221 6400 O0 6374.15 6314 6500 O0 6466.04 6406 6600.00 6557.78 6497 6700 O0 6649.36 6589 6800.00 6740.75 6680 6900.00 6832.10 6772.10 24 12 94 17 37 61 2O 39 15 23 1 O4 23 19 78 23 35 36 23 54 75 23 59 S 56 31 w S 51 48 w S 52 16 w S 50 38 W S 47 58 w S 47 21 w S 46 47 w S 46 16 w S 45 46 W S 45 43 W 60 98 84 17 111 84 143 67 181 39 220 73 260 46 300 56 341 11 381.79 3 36 1 72 t 26 5 ,40 0 47 0 6O 0 2`4 0 77 0 11 0 57 60.17 S 74.29 S 44 91.44 S 66 111.35 S 91 136.21 S 120 162.77 $ 149 189.91 S 178 217.53 S 207 245.76 S 236 274.16 S 265 25 24 W 05 W 86 16 W 112 41W 144 O0 w ~81 15 W 220 26 W 260 40 w 300 57 W 341 73 W 381 65 25 S 22 45 W 36 S 30 40 W 86 S 35 53 W 06 S 39 23 W 52 S 41 23 W 77 S 42 30 W 46 S 43 i 1 W 56 S 43 38 W 12 S 43 54 W 80 S 44 6 W 7000.00 6923 18 6863 18 24 34 7100.00 7014 7200.00 7105 7300.00 7196 7400 O0 7286 7500 O0 7377 7600 O0 7467 7700 O0 7559 780O O0 7651 7900 O0 7743 08 6954 O0 7045 01 7136 72 7226 20 7317 79 7407 07 7499 34 7591 91 7683 O8 24 43 O0 24 26 01 24 40 72 25 8 20 25 10 79 25 5 07 22 54 34 22 23 91 22 15 S 45 26 W S 44 50 W S 43 34 W S 42 55 w S 42 42 w S 42 15 w S 41 55 w S 42 33 W S 43 11 w S 44 28 W 423.04 464.70 506.33 547.78 589.87 632.43 674.77 715.58 754.12 791.94 0.28 0.34 0 36 0 44 0 46 0 44 0 39 1 34 1 65 0 38 303.05 S 295 19 W 423 06 S 44 15 W 332.44 S 324 362.26 S 353 392.50 $ 382 423.38 S 410 454.78 S 439 486.22 S 467 516.47 S 495 544.95 S 521 572.06 S 547 75 W 464 81W 506 16 W 547 76 W 589 50 W 632 89 W 674 30 W 715 28 W 754 65 W 791 74 S 44 20 W 37 S 44 19 W 82 S 44 14 W 89 S 44 8 W 44 S 44 1W 78 S 43 54 W 59 S 43 48 W 12 S 43 44 W 94 S 43 45 W COMPUTATION DATE: 6-JAN-92 PAGE 3 ARCO ALASKA, INC. D.S. 4-42 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEV: 29-DEC-1991 KELLY BUSHING ELEVATION: 60.00 FT ENG[NEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 8000 O0 7836 39 7776 39 22 29 8100 8200 8300 8400 8500 8600 87O0 8800 8900 O0 7928 O0 8021 O0 8114 O0 8208 O0 8302 O0 8396 O0 8490 O0 8585 00 8679 88 7868 63 7961 75 8054 24 8148 05 8242 23 8336 62 8430 12 8525 37 8619 88 22 7 63 21 42 75 21 2 24 20 31 O5 19 53 22 19 26 62 19 6 ~2 19 15 37 19 35 S 44 1 W 829 97 S 43 57 W 868 S 43 56 W 905 5 43 43 W 941 S 43 49 W 977 S 44 4 w 1011 S 44 27 W 1045 S 44 43 w 1078 S ~4 59 W 11tl $ 45 10 W 1144 01 39 83 32 96 58 6O 29 7O 0.49 0.42 0.77 0 66 0 84 I 15 0 43 0 58 0 84 0 3O 599 33 S 574 16 W 829.97 S 43 46 W 626 653 679 705 73O 754 778 801 824 70 S 600 63 S 626 92 S 651 55 S 676 49 S 700 53 S 723 06 S 747 29 S 770 79 S 793 57 W 868.01 S 43 47 W 50 W 905.39 S 43 47 W 74 W 941.84 S 43 47 W 29 W 977.33 S 43 47 W 32 W t011.96 S 43 48 W 83 W 1045.59 S 43 49 W 01 W 1078.61 S 43 50 w 02 W 1111.30 S 43 52 w 79 W 1144.72 S 43 54 ~ 9000.00 8773.56 8713.56 19 38 9100.00 8867.70 8807.70 19 55 9200.00 8961.59 8901.59 20 8 9300.00 9055.49 8995.49 20 8 9337.00 9090.22 9030.22 20 8 S 44 22 W 1178.28 S 44 8 W 1212.00 S 44 44 W 1246.42 5 44 44 W 1280.84 S 44 44 w 1293.58 0.29 0.84 1 .80 0.00 0.00 848.62 S 817.45 W 1178,30 S 43 56 W 872.81 S 840,94 W 1212.02 S 43 56 W 897.33 S 865.11 W 1246.44 S 43 57 W 921.80 S 889.33 W 1280,87 S 43 58 W 930.85 S 898.29 W 1293.61 S 43 59 W COMPUTATION DATE: 6-JAN-92 PAGE 4 ARCO ALASKA, INC. D.S. 4-42 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 29-DEC-1991 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 1000.00 999.99 939 2000.00 1999.96 1939 3000.00 2999.64 2939 4000.00 3999.40 3939 5000.00 4999.34 4939 6000.00 5993.77 5933 7000.00 6923.18 6863 8000.00 7836.39 7776 9000,00 8773.56 8713 0.00 -60 O0 0 0 N 0 0 E 0.00 99 0 21 N 78 4 E -2.16 96 0 29 N 8 41 E -8.03 64 1 57 $ 37 59 E -26.19 40 1 1 S 6 28 E -16.79 34 0 26 S 2 15 w -9.50 77 11 57 S 56 31W 60.98 18 24 34 S 45 26 W 423.0~ 39 22 29 S 44 1W 829.97 56 19 38 S 44 22 W 1178.28 0.00 0.09 0.49 0.60 0.29 0.01 3.36 0.28 0.49 0.29 0 O0 N 0 2 10 8 19 6O 3O3 599 848 0.00 E 42 S 3.58 E 3 44 N 9.08 E 9 63 N 26.81 E 28 68 S 33.46 E 34 32 S 34.07 E 39 17 S 25.24 W 65 05 S 295.19 W 423 33 S 574.16 W 829 62 S 817.45 W 1178 0 O0 N 0 0 E 60 5 83 16 E 41 N 74 59 E 84 N 68 22 E 57 S 75 27 E 17 $ 6O 27 E 25 S 22 45 W 06 S 44 15 W 97 S 43 46 W 30 S 43 56 W 9337.00 9090.22 9030.22 20 8 S 44 44 W 1293.58 0.00 930.85 S 898.29 W 1293.61 S 43 59 W COMPUTATION DATE: 6-JAN-92 PAGE 5 ARCO ALASKA, INC. D.S. 4-42 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 29-DEC-1991 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE' MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPT~ DEPTH DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 0 O0 60 O0 160 O0 260 O0 360 OO 460 560 660 760 860 0 O0 60 O0 160 O0 260 O0 360 O0 O0 460 O0 O0 560 O0 OC 660 O0 O~ 760 O0 01. 86O O0 -60 O0 0 O0 100 O0 200 O0 300 4OO 50O 60O 700 8OO 0 0 N 0 0 E 0 2 564 5 E 0 3 S 40 39 E 0 2 S 63 6 E O0 0 5 S 9 51 E O0 0 8 S 37 45 E O0 0 13 S 46 24 E O0 0 28 S 86 17 E O0 0 30 N 85 14 E O0 0 29 N 79 26 E 0.00 0 O0 0 04 0 02 0 04 0 0 -0 -0 -1 10 12 11 70 40 0.00 0.00 0.00 0.00 0.17 0.00 0.1z~ 0.14 0.1z~ 0.09 0 O0 N 0 O0 N 0065 0085 .0 16 S 0 34 S 0 53 S 0735 0 72 S 0585 0.00 E 0.00 E 0.01 E 0.06 E 0.11 E 0.21 E 0.38 E 0.93 E 1 .77 E 2.64 E 0.00 N 0 0 E 0 O0 N 0 0 E 0 06 S 8 48 E 0 10 S 35 54 E 0 19 S 33 25 E 0 39 S 31 33 E 0 65 S 35 38 E 1 18 S 51 56 E 1.91 S 68 0 E 2.71 S 77 33 E 960 01 1060 1160 1260 1360 1460 1560 1660 1760 1860 96O O0 01 1060 02 1160 02 1260 02 1360 03 1460 03 1560 03 1660 03 1760 04 1860 O0 1000 O0 1100 O0 1200 O0 1300 O0 1400 O0 1500 O0 1600 O0 1700 OO ]800 900 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 0 22 N 80 48 E 0 18 N 80 9 E 0 17 N 86 53 E 0 24 S 88 12 E 0 32 N 86 42 E 0 34 N 78 16 E 0 35 N 71 51 E 0 18 N 62 33 E 0 17 N 24 40 E 0 26 N 5 25 E -1 .96 -2.43 -2.84 -3.19 -3.80 -4.56 -5.40 -6. 14 -6.60 -7.17 0 10 0 07 0 O0 0 37 0 21 0 O0 0 15 001 0.38 0.17 0 47 S 0355 0 29 S 0305 0295 0 155 0 10 N 041 N 0 72 N 1 36 N 3.33 E 3.90 E 4.41 E 4.94 E 5.81 E 6.76 E 7.72 E 8.47 E 8.82 E 8.96 E 3.36 S 82 1 E 3.91 S 84 49 E 4.42 S 86 18 E 4,95 5 86 34 E 5.82 S 87 10 E 6.77 5 88 43 E 7.72 N 89 14 E 8.48 N 87 12 E 8.85 N 85 21 E 9.07 N 81 22 E 1960 04 1960 O0 1900 O0 2O6O 2160 2260 2360 2460 2560 266O 2760 2860 04 206O 05 2160 07 2260 10 2360 14 2460 18 2560 22 2660 25 2760 29 2860 O0 2000 O0 2100 O0 2200 O0 2300 O0 2400 O0 2500 O0 2600 O0 2700 O0 2800 O0 O0 O0 O0 O0 O0 O0 O0 O0 0 27 N 7 43 E 0 40 N 15 22 E 0 58 N 25 27 E 1 14 N 30 40 E 1 36 N 33 32 E 1 40 N 44 6 E 1 37 N 58 31 E 1 28 N 73 26 E 1 26 N 86 55 E 1 36 S 75 21 E -7.77 -8.56 -9.85 -11.67 -14.13 -16.94 -19.78 -22.32 -24.33 -25.99 0.17 0 34 012 0 56 0 28 0 3O 0 3O 0 43 0 41 1 31 2 12 N 3 04 N 4 37 N 6 02 N 8 16 N 10 33 N 12 14 N 13 28 N 13 71 N 13.50 N 9 04 E 9 21 E 9 70 E 10 60 E 11 92 E 13 72 E 15 94 E 18 42 E 20.88 E 23.51 E 9.28 N 76 47 E 9.70 N 71 44 E 10.64 N 65 45 E 12.19 N 60 24 E 14.44 N 55 37 E 17.t8 N 53 1 E 20.03 N 52 43 E 22.71 N 54 12 E 24.98 N 56 43 E 27.11 N 60 8 E 2960.34 2960.00 2900.00 3060.39 3060.00 3000.00 3160.43 3160.00 3100.00 3260.47 3260.00 3200.00 3360.50 3360 O0 3300.00 3460.53 3460 O0 3400.00 3560.54 3560 O0 3500.00 3660.55 3660 O0 3600.00 3760.56 3760 O0 3700.00 3860.57 3860 O0 3800.00 1 59 S 39 25 E 1 41 S 31 49 E 1 37 S 29 18 E 1 33 S 26 17 E 1 21 S 14 10 E 1 14 S 10 53 E 0 48 S 9 6 E 0 48 S 15 26 E 0 46 S 6 34 E 0 52 S 9 48 E -26.37 -25.80 -24.98 -24.11 -23.03 -21.77 -20.75 -19.91 -19.16 -18.23 0.52 0.35 0.15 0.32 0.03 0.14 0.13 0.01 0.17 0.15 11 .71 N 9.06 N 6.57 N 4.10 N 1.82 N 0.44 5 2.16 S 3.57 S 4.86 S 6.33 S 25.95 E 27.90 E 29.32 E 30.66 E 31.49 E 32.02 E 32.36 E 32.61 E 32.88 E 33.08 E 28.47 N 65 43 E 29.33 N 72 0 E 30.05 N 77 22 E 30.93 N 82 23 E 31 54 N 86 42 E 32 02 $ 89 13 E 32 44 S 86 10 E 32 81 S 83 45 E 33 23 S 81 36 E 33 68 S 79 10 E ARCO ALASKA, INC. D.S. 4-42 PRUDHOE BAY NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG M[N DEG MIN COMPUTATION DATE: 6-JAN-92 PAGE 6 DATE OF SURVEY: 29-DEC-1991 KELLY BUSH[NG ELEVATION: 60.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECT[ON SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH 3960 59 3960 O0 3900 O0 O0 4O00 O0 O0 4100 O0 O0 4200 O0 O0 4300 O0 O0 4400 O0 O0 4500 O0 O0 4600 O0 O0 4700 O0 OC 4800 OC 1 0 S 9 22 E 0 57 S 8 1 E 046 S 3 5 E 048 S 7 4 E 035 S 3 4 E 0 42 S 1 18 W 0 35 S 6 32 E 0 36 S 1 13 E 0 19 S 2 59 W 0 23 S 4 33 W FEET DEG/IO0 FEET FEET FEET DEG 4O6O 60 4060 4160 62 4160 426O 63 4260 436O 63 4360 4460 64 4460 4560.65 4560 4660.65 4660 4760.65 4760 4860.66 4860 4960.66 4960 O0 4900 O0 O0 5000 O0 O0 5100 O0 O0 5200 O0 O0 530O O0 O0 540O O0 5500 O0 5600 O0 5700 O0 5800 0 20 0 25 0 36 0 32 0 37 O0 1 16 O0 3 50 O0 6 45 O0 8 43 O0 10 38 5 1 21 w S 17 11 E S 16 59 E S 25 17 E 5 37 37 E S 17 7 W 5 65 36 W S 57 54 W S 57 50 W S 60 41W -17 22 -16 12 -15 18 -14 22 -13 42 -12 61 -11 79 -tl 06 -10 54 -10 06 5060.66 5060 5160.66 5160 5260.67 5260 5360.67 5360 5460.68 5460 5560.81 5560 5661.21 5660 5762.11 5760 5863.64 5860 5965.52 5960 O0 5900.00 11 20 O0 6000.00 14 21 O0 6100.00 16 59 O0 6200.00 19 30 O0 6300.00 22 57 O0 6400.00 23 19 O0 6500.00 23 35 O0 6600.00 23 57 O0 6700.00 23 58 O0 6800.00 24 18 5 58 38 W S 51 54 W S 52 23 W S 51 26 W 548 9 W 5 47 25 w S 46 47 w S 46 12 W -9 71 -9 20 -8 76 -8 34 -8 O4 -7 39 -2 69 5 6O 18 68 35 50 54 24 76 17 103 55 135 82 175 41 218 13 261 43 305 27 6068.01 6060 6171.78 6160 6276.98 6260 6384.64 6360 6493.42 6460 6602.43 6560 6711.64 6660 6821.06 6760 6930.60 6860 7040 49 6960 O0 6900.00 24 37 53 7060 41 7160 51 7260 99 7360 40 7460 01 756O 37 766O 39 7760 55 7860 O0 7000.00 24 38 O0 7100.00 24 29 O0 7200.00 24 59 O0 7300.00 25 12 O0 7400.00 25 4 O0 7500.00 22 53 O0 7600.00 22 18 O0 7700.00 22 18 O0 7800.00 22 30 5 45 47 W 349 66 S 45 38 W 394.35 S 45 15 w 439 88 8O 31 37 34 13 98 68 53 74 7150 7260 7370 7480 7591 7701 7809 7917 8025 S 44 20 W 485 S 43 2 W 531 S 42 47 w 577 S 42 20 w 624 S 41 56 w 671 S 42 33 w 715 $ 43 33 W 757 S 44 23 W 798 S 43 59 W 839 0.05 0.29 0.58 0.00 0.06 0.02 0.37 0.48 0.17 0.31 0.43 0.38 0.23 0.30 0.71 3.65 1 .67 3.03 3.05 1 .07 0 96 1 ,76 3 18 5 07 0 62 0 44 0 25 0 47 0 21 0 28 0.25 0.61 0 57 0 60 0 31 0 50 1 26 1 66 0 23 0 34 8.00 S 9.74 S 11.21 S 12 63 S 13 86 S 14 98.S 16 15 S i7 12 S 17 91 S 18 49 S 33 36 E 33 60 E 33 79 E 33 88 E 34 02 E 34 01 E 34 05 E 34 02 E 34 09 E 34 O0 E 34 31 S 76 31 E 34 35 36 36 37 37 38 38 38 98 S 73 50 E 60 S 71 39 E 16 S 69 33 E 73 S 67 50 E 16 S 66 1,4 E 69 S 64 38 E 09 S 63 17 E 51 S 62 17 E 71 S 61 28 E 19.05 S 19.78 S 20.56 S 21.48 S 22.46 S 23.60 S 26.41 S 30.50 S 37;76 S 46.59 S 34 08 E 34 11 E 39, 34 28 E 39 34 66 E 40 35 24 E 41 35 49 E 42 31 64 E 41 23 90 E 38 12.56 E 39 2.56 W 46 39 04 S 6O 48 E 43 S 59 54 E 97 S 59 3 E 78 S 58 12 E 78 $ 57 29 E 62 S 56 23 E 21 S 50 9 E 75 S 38 5 E 80 S 18 24 E 66 S 3 9 W 56.44 S 19.38 W 59 68 S 18 57 W 69.29 S 37 69 W 78 88 S 28 33 W 86.31 S 59 52 W 104 84 5 34 35 W 106.36 S 85 26 W 136 32 5 38 43 W 132.20 S 115 53 W 175 57 5 41 9 W 161.01 S 147 23 W 218 17 S 42 26 W 190.57 S 178 97 W 261 43 S 43 12 ~ 220.80 S 210 81 W 305 27 S 43 40 W 251.73 S 242 70 W 349.67 5 43 57 W 282.94 S 274.72 W 394.37 5 44 9 W 314.89 S 307.18 W 439.91 S 44 17 W 347.47 S 339.57 W 485.84 S 44 20 W 380.45 S 370.94 W 531.35 S 44 16 W 414.20 $ 402.28 W 577.40 S 44 10 W 448.80 S 434.05 W 624.36 S 44 3 W 483.51 S 465.45 W 671.14 S 43 55 W 516.76 S 495.57 W 715.98 S 43 48 W 547.54 S 523.72 W 757.68 S 43 44 W 576.76 S 552.27 W 798.53 S 43 45 W 606.36 S 580.95 W 839.74 S 43 46 W COMPUTATION DATE: 6-JAN-92 PAGE 7 ARCO ALASKA, INC. D.5. 4-42 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 29-DEC-1991 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8133 58 7960 O0 7900 O0 22 8241 26 8060 8348 44 8160 8455 23 8260 8561 57 8360 8667 58 8460 8773.40 8560 8879.44 8660 8985.60 8760 9091.81 8860 O0 8000 O0 8100 O0 8200 O0 830O OC 8400 O0 8500 O0 860O O0 8700 O0 8800 O0 21 26 O0 20 48 O0 20 13 O0 19 36 O0 19 14 O0 19 8 O0 19 37 O0 19 37 O0 t9 51 S 43 55 w 880.62 S 43 52 W 920.56 S 43 47 W 959.12 S 44 6 W 996.59 S 44 29 w 1032.75 S 44 40 w 1067.95 S 44 42 W 1t02.55 S 45 2! W 1137.80 S 4`4 28 W 1!73.4~ S 44 4 W 1209.21 021 0 54 0 37 2 05 0 85 0 04 0 53 0 36 0 ,47 0 88 635.79 S 609 32 W 880 63 S 43 47 W 664.57 S 637 692.41 S 663 719.45 S 689 745 38 S 714 770 48 S 739 795 09 S 763 8~9 93 S 788 845 17 S 814 870 81S 839 02 W 920 69 W 959 64 W 996 84 W 1032 51W 1067 86 W 1102 89 W 1137 07 w 1173 01 w 1209 56 S 43 47 W 12 S 43 47 W 60 S 43 47 W 76 S 43 48 W 95 S 43 50 W 56 S 43 51 w 82 S 43 54 W 46 S 43 56 W 23 S 43 56 W 9198.31 8960.00 8900.00 20 8 9304.81 9060.00 9000.00 20 8 9337.00 9090.22 9030.22 20 8 S 44 46 W 1245.84 S 44 44 W 1282.50 S 44 44 W 1293.58 .58 0.00 0.00 896.92 S 864.70 W 1245.86 S 43 57 W 922.98 S 890.49 W 1282.52 S 43 58 W 930.85 S 898.29 W 1293.61 S 43 59 W ARCO ALASKA, INC. D.S. 4-42 PRUDHOE BAY NORTH SLOPE, ALASKA MARKER LAST READING GCT TD COMPUTATION DATE: 6-JAN-92 PAGE 8 DATE OF SURVEY: 29-DEC-199t KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: M,MCBRIDE INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION : 567' FNL & 457' FEL, SEC34 T11N R15E MEASURED DEPTH TVD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 9200.34 8961.91 8901.91 897.41 S 865.20 W 9337.00 9090.22 9030.22 930.85 S 898.29 W ARCO ALASKA, INC. D.S. 4-42 PRUDHOE BAY NORTH SLOPE, ALASKA MARKER LAST READING GCT TD COMPUTATION DATE: 6-JAN-92 PAGE 9 DATE OF SURVEY: 29-DEC-1991 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: M.MCBRIDE SURFACE LOCATION = 567' FNL & 457' FEL, SEC34 TllN ElSE MEASURED DEPTH TVD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA ' NORTH/SOUTH EAST/WEST 9200.34 8961.91 8901.91 897.41S 865.20 W · 9337,00 9090.22 9030.22 930.85 S 898.29 W FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTA~ DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 9337.00 9090.22 9030.22 1293.6t S 43 59 W DIRECTIONAL SURVEY COMPANY FIELD WEI.J. COUNTRY RUN DATE LOQ(2ED ARCO ALASKA, INC. PRUDHOE BAY 4-42 USA ONE 29 - DEC - 91 DEPTH UN!T FEET REFERENCE 92001 WELL: D.S. 4-42 (567' FNL,457' FEL,SEC 34,T11N,R15E) HORIZONTAL PROJECTION 200 - 1 (XX) -800 -600 -400 -200 0 200 400 WELL' D.S. 4-42 ( 567'FNL,457'FEL,SEC 34,T11N,R15E) VERTICAL PROJECTION '" J~O(~C"C GEOLOGIC~I~L ~TERJJii'LS I'NVENTOR~i~ L]ST ~/~ ~~~ ,,,( check off or list data as it is received ] .... /Xv~ .'ah'7"! ' ~/~~ dritlin9 histo~' /' ..W.Y'"I~ I, ,~=" tests I,,~;~ ~e?ipt~onl cored inte~ais- core, analysis , '~ d~ ditch inte~ais .......... digital data III III IBII IIIII I IIIB III I IIIII I I I I I I III m II I lB I I IIBI II II I I IN I I I I I .............. LOG TYPE ..... RUN ' INTERVALS' ' SCALE NO. ilU iii ii ii i i iii[ i ii i~ iii ii i i i ii i iii i i i ~]D~,.~ ~J~~ ~-/~ ~) / ..... ~~'- ~ ~' ,~" ~ ~',, sl ~ C~T, ,, F ........ ~ r~ .......... D~ o ,, (,4~p - .~ , , ~, 2,~ /'_ 7o 2~ ' r,, ,., ............ 13] ~1...... ........... , ,, ,, ........ , ,, , , ,,,,, , .... ,, ,, ............. , ~"q ...................... ............. , ,, , , ,, WALTER J. HICKEL, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 April 13, 1992 D. L. Pryzwojsk± ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99501-1433 Re: Inadequate or missing samples Well Name: PBU Permit Number: To Mr. Pryzwojski: . The Alaska Oil and Gas Conservation Commission requests the operator of the above referenced well to resubmit the dry ditch / core sample intervals listed on the attached transmittal(s). Sample sets have been received by the Commission, however during the verification process, some intervals have .been deemed either inadequate or were not submitted. The intervals are listed on the attachment, please submit these listed intervals as soon as possible. Th'e following is an excerpt from the Alaska Oil and Gas Commission Regulations: 20 AAC 25.071. Geological Data and Logs. Stipulates that' operator shall: (b) within 30 days after completion, suspension, or abandonment of a drilling well the operator shall file with the commission (2) a complete set of washed and dried, legibly- identified samples of all drill cuttinqs, as caught by the operator in accordance with good geological practices, consisting of a minimum of one-quarter cup in volume or three ounces in weiqht of cuttings for each sample interval; (3) a lithologic description of all cores and a chip or chips from each foot of recovered core; the chips must be representative of the one-foot interval, and must be approximately either one cubic inch in volume or three ounces in weight; If you have any questions in reference to this matter, please contact Larry Grant at (907) 279-~ Robert Crandall Senior Petroleum GeoloGist l'o: AI1CO Alaska Oil Gas Con,creation Commission 3fl11! Porto, pine Orive Anchorage. Alaska 99501-3192 907-279-1433 Re: Well name: PBU ~ ~ Perlnlt: 91-0106 Subject: Samples Receipt of the following core samples. These samples are hereby acknowledged as being received. BOX It INTERVALS 1 9073' thru 9129' 2 9130' thru 91114' The fo!lowi.g intervals are inadequate: Th_c f__ollqwin_q intervals were not ~ubmitted: gU-gG' 5U9/' 9090' 9122' 9142' 9148' 91G8' l:leceiv~ Dated: ',/~ .;~__~ - Copy sent tosendcr: Yes ~"- No ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 3-6-92 REFERENCE: ARCO MAGNETIC TAPE(S) WITH LISTINGS / )f~ 4-78T ~-16-~ 11-1~-91 HRI/BCS/DSN2 Ibm 1 Job~~25-9 DIFL/BHCA/CNL Job#NA BHCA/DIFL/~ Run I Job~8~ Run 2 J~053 Please sign and return the ~ched c~?y_as receipt of data. RECEIVED BY Have A Nice Day! _~//~_ ff Sonya Wallace APP~R OVED ATO- 1529 Trans# 9205'~-- HL8 Atlas Atlas CENTRAL FILES (CH) CHEVRON D&M # DEDE SCHWARTZ (OH/GCT) # EXXON MARATHON MOBIL # PHILLIPS PB WELL FILES R&D #BPX # STATE OF ALASKA TEXACO Alaska {3it & Gas cons, commission Anchorage ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 2-21-92 '/12-1-91 ARCO CASED HOLE CCL CPerfl l~m 1, ~Y' Atlas Perf Reconi l~m 1,~' HLS PSG (Computed) Run 1, ~Y' l~-s PSG/PL8 II Run 1, ~' HLS P6G (Computed) P~ 1, ~' al~ PSG ~veraged~ mm ~, ~' a~S Perforation ~ 1, ~' HIS Tracer~,hek Temp ~ 1, ~' HIS CNL Run 3, ~' 8ch ~ Detect Run 1, 1" Camco Please sign and return the attached co~p~ u receipt of data. RECEIvED BY__~__ _~~--~~~ Have A Nice Day~ Sonya Wallace ATO- 1529 # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL #PHILLIPS PB WEI~ FILF~ R&D #BPX # STATE OF ALAS~ TEXACO RECEIVED FEB 2 5 1992 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alas~ Inc. P.O.Box 1~ Anchorage, Alaska 9~510 DATE: 2-21-92 4-34A ~4-34A / ~4-39 ~ ~-3~ / t4-4=/ 4-42 ~ 12-25 ~2_25 1-26-92 PDK-100/GR/CC~ R'" 1, 5" Arias 2-7-92 CCL (Peri) R-- 1, 5" Atlas 2-6-92 PFC/GR (Peri) R-n 1, 5" Atlas 2-6-92 GR/C(X, Run 1, 2"&5" Atlas 2-2-92 Perf Record- R-~ 1, 5" Sch 2-2-92 GR/~ R-n 1, 5" Sch 12-28-91 CBT Run 1, 5" Sch - 12-28-91 CET R-n 1, 5" Sch 2-3-92 CCL (Tubing Cutter) Run 1, 5" Aths 2-8-92 Collar (Packer Record) Run 1, 5" Atlas Please sign and return the attached colby as receipt of data. RECEIVED BY___~_~ Have A Nice Dayl Sonya Wallace AP P R O V E D ~T0-~52~ .~. Trans# 9203~~ · # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHIL~ PB WELL FILES R&D # PX # STATE OF ~KA TEXAC~ RECEIVED FEB 2 5 1992 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, inc. ~ Post Office BoA *~00360 Anchorage, Alaska 99540=0360 Telephone 907 276 ~2'15 SAMPLE TRANSMITTAL TO' State of Alaska Oil & Gas Conservation Comm. 3001 Porcupine Dr. Anchorage, Ak. 99501 OPERATOR: Arco SAMPLE TYPE' CORE CHIPS DATE: 13 February, 1992 AIRBILL #: AL 484461 AFT#: 2-2-13- CHARGE CODE# NAME~):~4-42 APl N NUMBER OF BOXES: SAMPLES SENT: THE FOLLOWING CORE CHIPS WE,RE SENT IN TWO BOXES:fF_~~ 9073'-9090' 9096'-9152 9156'-9184' ,.~ /o( SENT BY: D. L. Przywojski UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND MAIL A SIGNED COPY OF THIS FORM TO: RECEIVED ArcoAlaska, Inc. P. O. Box 100360 Anchorage, AK. 99510 Attn' D. L. Przywojski ABV-100 ,? E!VED FEB 1 5 1992 Alaska Oil & Gas Cons. Commission Anch0rago ARCO Alaska, !nc. is s Subsidiary of Atlantic Richfield To: ARCO Alaska Oil Gas Conservation Commission :3001 Porcupine Drive Anchorage, Alaska 99501-3192 907-279-1433 Re: Well name: PBU DS 4-~~~/ Permit: ~ ~/-/c//3 :~ubject: Samples Receipt of thc following core samples, These samples are hereby acknowledged as being received. BOX ~ INTERVALS ! 907:3' thru 9!29' 2 §1:30' thru 9184' The following intervals are inadequate: Thc followine interyals were not submitted: 909Y' 9098' 9142' gl ,48' 9168' Receiv~ ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 1-24-92 REFERENCE: ARCO M&GNETIC TAPE(S) WITH LISTINGS / *CORRECTED* 4-35~'217- 91 DIFL/BHCA/ZDL/CNL Rim1 Job#89793 ~l.~/J'"3 4-41 f~ ~,11--92 DIFL/AC/ZDL 1 Job~77038 ~1_t5t,,~ 4-42 12-26-91 DIFL/BHCA/CNL Job#97061 Please sign and return the attached copy as receipt of data. RECEIVED BY Have A Nice Day! Sonya Wallace ATO- 1529 Atlas Atlas At]as CENTRAL FILES (CH] CHEVRON D&M # DEDE SCHWARTZ (OH/GCT) # EXXON MARATHON MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO Please replace previously received tape of 4-35 with this corrected copy. RECEIVED FEB 0 5 !992 Alaska 011 & ~,~s ~,~ ~um~ion .~LASK¢., INC._ '~-~'~ BOX ~ ~,'.')S6(') ~-~NCHORAGE, ALASKA 99.5~() DATE' ~ -~ 5-92 I~,EEF' EI~,ENI..,E · .,, (" 4-42 I" '14 .... ,:2 (,, 4 .... 42 _ARC(:) OPEN I"tOLE ,~*.~!_//~ ._ t2-26-9i £'5'i"VD 1 ~.-,-_o-9 t BHCA-GR i 2-26-9 i D ]: F:'I...-" 6. F;..' ~/ i '2-26-9t CNL.-GR ,/ // 1 '..'-Z6-Y'I HF:'/VF:'C F; M i" -" (; F;.: RUN i, t"&2" RUN t, ,_:"' "&':~" RUN i, 2"&.5:" F:UN i , 2"&'.:.,~" RUN i, 2"&5:" F'I...li!:ASE ~:[(;-N AND I;~EI"tJRN THE ATTACHED COF'Y AS RIECEI'F'T UF"' DA'f'A, ATL..A.S' A 'l" L A S; A 'f' I.. A S A'f'I.~A:~ AfL. AS R E C E; ]; V E: D F~ Y ................ ~... ~'-' ' HAVli.'". A NICE DAY! ;!:,' 0 N Y A ;JHL. L..~-IL, E A "1" 0-- f 5' '.29 API::'ROVE f) ,,,~... - JAN2ElME D 'i' ~:;:,.:~ N. ::.: :; ii' ;;Fi 11992 D ]; STR ]; BU'T' I ON Alaska Oil & 6as CODS. Commission Armhora§e '"' CENTI;,'AL. FILE;E,' ~,-~ C: H E V R 0 N · .-'"' D & H · '"~,- E'. ....... :~' T E N :ii/I 0 i"..! E X P I... 0 R A T ]: r'~ N, '"'.,,- E X X O N '"'-,. H A R A i' H 0 N -,,-'"' HOBIL ~'"' P F.t I L L I P S · ..'"' I::' B l:.j. E L.. I... F:' ]: L.. Iii: ..? R & D · "' B F:' X '11 ' :L .'_'_:; T A "f'E 0 F A L.. ASK A · ,-'"' "f' E X A C 0 ALASKA OIL AND GAS CONSERVATION COMMISSION .December 10, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Michael Zanghi Area Drilling Engineer ARCO Alaska, Inc. P. O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit DS 4-42 ARCO Alaska, Inc. Permit No. 91-143 Sur. Loc. 567'FNL, 457'FEL, Sec. 34, TllN, R15E Btmhoie Loc. 1374'FNL, 1311'FEL, Sec. 34, TllN, R15E Dear Mr. Zanghi: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The mechanical integrity of the injection wells must be demonstrated under 20 AAC 25.412 and 20 25.030(g)(3) before operation. Please contact the commission at least 24 hours before pressure testing so that a representative o~ the commission may witness the test. Sincerely, ./ ....... ~ ._ /:"lC,'\.. ~' / -.. ( ../',,, ' ~I/ ~6nnie C. Smith, Commissioner Alaska Oil and Gas Conservation Commission BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll"lllb. Type of well. Exploratory[] Stratigraphic Test E3 Development Oili-] Re-Entry [] DeepenF'II Service [] Development Gas [] SingleZone [] Multiple Zone[] ';~. N~.me of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. KBE = 60'f e e t Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchorac~e. Alaska 99519-6612 ,ADL 2832~j 4. Location of well at sur[aCe 7. Unit or property Name 11. Type Bond(see 20 ^^c 25.o2s) 567' FNL, 457' FEL, SEC. 34, T11N, R15E Prudhoe Bay Unit At top of productive interval 8. Well number Number 1338' FNL, 1237' FEL, SEC. 34, T11N, R15E DS 4-42 U-6300610 At total depth 9. Approximate spud date Amount 1374' FNL, 1311'FEL, SEC. 34, T11N, R15E December 10, 1991 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD andmVD) p rope~L line 28324 @ 131/'feet DS 4-06 @58'/0'-2000'MD feet 2560 9280'MD/9078'TVD[eet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 Mc 25.o35 (e)(2)) ~Kickoff depth 55oo~eet Maximum hole ancjle fo o Maximum surface 2770pslg At total depth (TVD) ,~50psi~ I18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5~ H-40 WELD 80' Surface 115' 115' 2000# Poleset 13-1/2" 10-3/4" 45.5# J-55 B TC 3465' Surface 3500' 3500' 2172 cu ft CS 111/406 cu fl Class G 9-7/8" 7-5/8" 29. 7# L-80 B TC 4465' Surface 4500' 4500' 9-7/8" 7-5/8" 29. 7# L-80 BTC-MO£ 4630' 4500' 4500' 9130" 8938' 307 cu ft Class G 6-3/4" 5-1/2" 17# CR13 FL4S 450' 8830' 8657' 9280' 9078' 116 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural ConductorRECEIVED Surface Intermediate ProductionDEC - ,5 3993 Liner A~aska 0il & Gas Cons. C0mmissiO~ Perforation depth: measured Anchorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed reportl-I 20 AAC 25.050 requirements[-! 21. I hereby. / '// /-/ -----7~ /''cer~ify ,that the foregoirta is true and correct to the best of my knowledge Signed //~ ( ~_.'7~--~(' T itle Area Drilling Engineer D at e/'2_ -_.~'-".- c~// ' ' .'~ -- Commission Use Only Permit Number IAI31 number IAppro_..val date _ ISee cover letter VI-/~,~ I5O-~z?,-- ~z.z~? I /~--'/D~ ~'~/ Ifor other requirements Conditions of approval Samples required [] Yes ,,,~No Mud Icg required [] Yes~'No Hydrogen sulfide measures [] Yes ~_ No Directional, survey required ~'Yes ' D-No Required working pressure~rBOPE 17'12M~ CI3M; 1~5M; I-]10M; 1'-1151~; Other: ! '" Z ,./'~," ~,.., . . by order of Approved by I~'~ 4~"~ ~'~4 f"~.. ,4~,'~ ~ ~r~["' ~ ~ ......... 10~401 Rev. 1..2~ Submit in triplicate PBU DS 4-42 OPERATIONS $1,1MMARY 1. MIRU drilling rig. N/U diverter and function test same. 2. Drill 13-1/2" hole to ,3,500' MD/TVD. Run and cement surface 10- 3/4" casing. Nipple up BOP's and function test same to 5000 psi. . P/U 9-7/8" BHA and RIH. Test casing to 3500 psi for 30 minutes. Drill 10' of new hole and perform leak of test. . Drill 9-7/8" intermediate hole to kick of point at 5500'MD/TVD. Build angle at 2.5 deg/100'md until 200 19' of inclination is achieved at 6313' MD/6296'TVD. . Drill 9-7/8" intermediate hole to 7-5/8" casing point at 8938'TVD/9130MD. (10' above Sadlerochit top ) RIH with 7-5/8" casing and cement the same. . Pick up 6-3/4" BHA and RIH , test casing to 3500 psi. for 30 minutes. Drill production hole to 9280'MD/9078'TVD, condition hole to run open hole logs. 8. Run open hole logs as programmed. 9. Set 5-1/2" liner and cement the same. 10. Clean out the liner and test liner to 3000 psi for 30 minutes. Displace well to 8.6 ppg filtered seawater and re-test casing to 3000 psi for 30 minutes. 11. Run cased hole logs. 12. Run 4-1/2" L-80 tubing and packer assembly with SSSV. Test tubing and casing to 3000 psi. Freeze protect with diesel. 13. N/U tree and test to 5000 psi. Release Drilling Rig. 14. Rig up Wireline and perforate. RECEIVED DEC - 5 ~991~ Alaska 0ii & 6as Cons. Anchorage PBU DS 4-42 OPERATIONS SUMMARY CONT'D ~ Anticipated BHP' _o Maximum Anticipated Surface Pressure' _o Planned Completion Fluid' 3600 psi @ 8800'SS 2800 psi 8.6 filtered seawater Note- a. Excess non-hazardous fluids developed from the well operations and as necessary to control the reserve pit fluid level will be pumped down the 7-5/8" x 10-3/4" annulus. The annulus will be left with a non-freezing fluid during any extended period. The annulus will be sealed with 300 sxs of cement followed by Arctic Pak. b. Minimum distances of wells within 200 ft. of the proposed well are: _o DS 4-06: 57' @ 2500' MD/TVD "DS 4-13: 77.50' @ 5300' MD/TVD o DS 4-05: 108' @ 3700' MD/TVD c. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.003. d. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/ft ). e. Based on previous logs on DS#4, no potential productive zones are anticipated above 3500' TVD. f. No potential hazardous levels of H2S are anticipated in this well. RECEIVED DEC - ,5 1991 Alaska OJJ & Gas Cons. Commission Anchorage DS 4-42 MUD PROGRAM Depth Density VIS YP INT 10MIN FL OIL SOLIDS IVt,D (TVD) (PPG) GF~ S GELS cc/3om~, (%) (%) TYPE SPUD 8.8 300 70 30+ 50+ 25 0 2 TO TO TO TO TO 10-3/4" 9.2 100 40 6 csg. pt. SET 10-3/4" CASING GEL/BENEX SPUD MUD Depth (TVD) Density VIS YP INT 10MIN FL OIL SOLIDS IVI. D (PPG) GELS GELS cc/3omin (%) (%) TYPE 1 0 - 3 / 4" 8.7 1 0 6 2 4 2 5 0 2 LIGHTLY t O t O t O t O t O t O t O t O TREATED 5000 9.7 1 5 1 6 4 1 0 1 0 9 POLYIVER 5 0 0 0 9.7 1 5 1 6 4 1 0 1 0 9 LIGHTLY t O t O t O t O t O t O t O t O TREATED 7-5/8" 10.0 20 25 6 1 2 6 11 POLYIVER SET 7-5/8" CASING Depth (TVD) Density VIS YP INT 10MIN FL OIL SOLIDS ~ (PPG) GELS GELS cc/3omin (%) (%) TYPE 7 - 5 / 8" 8.7 1 0 6 2 3 8 0 4 LIGHTLY t O t O t O t O t O t O t O to TREATED TD 9.3 9.2 1 5 1 0 1 2 6 6 POLYIVER SET 5-1/2" LINER THIS MUD PROGRAM IS ONLY A GUIDELINE. ACTUAL HOLE CONDITIONS WILL DICTATE THE ACTUAL MUD PROPERTIES. RECEIVED DEC - 5 1991 Alaska 0il & Gas Cons. Commissioa Anchorage 4000 5000 6000 7000 ' ' ' ....... I I I I r I I I I I I I I I r I I I I I I r i i i i i i i ~ ........... ' !' RI(B EI.5?VATION 60' 20" Casing TVD=I13 TMD=ll3 i. AR(20 ALASKA, I1 ;1C. DS4-42SH SHL: U 1 IN 15E 34 567' FN ~ 457' FEL THL: U 1 1N l~E 34 1338' ~ IL 1273' FEL BHL: U llN 15E34 1374' ~ ~ 1311' FEL S 46 36' ~V ) ,, ,, , 10-3/4' C~g ~)=3~00 ~35~ D]~0 ........... ~D~5~ ~DMS~ D~=0 K-15 ~0 ?~0 DE~0 ~ ........ KOP lo m.o UG~ ~5~} T~5~2 D~ EOC ~6295 ~D=6313 DE~14: - ~789~ ~D:8 q7 DEP=733 - ~ T~G~ ~:8938 T~=9130 DEPt~ D~=965 D - 5 t99{ ,, ~ ~=~, ~= ~a ~:u=~~={{21 Alaska 0il ~ Gas Cons. T~G~ ~:8938 T~=9130 DEP=ll21 ~ WD~7~ T~=9280 D~=llT] Anahorago , , ,. I ............... ii, i, , i lOOO 20o0 30oo ['~ 4000 < ~5ooo J 7000 80OO 9OOO 10000 0 1000 2000 3000 4000 5000 6000 7000 VERTICAL SECTION ARCO ALASKA, INC. DS4-42SH S 46 36' W 200~ 1000- 0 0 Oqooo i -2000 -3000 E - W COORDINATES -4000 -3000 -2000 - 1000 0 1000 2000 3000 3000 I I I I I I I I I r I [ I r ~ r ~ t I i I I I I I I I I T i I I I I I I t , , I , , ~ , r Ir, ............... 3000 '- . 87~5 PBU_(I~ ~~3 2000 04-05 x'X?6° /7932 ~_ .,,,~ . i~_~ ,ooo "~6088 64 ~~7' ~057 ;Z_/4~ 04-13 -1000 :80 / ~56 ~624 -2000 5~9 52 -3000 -4000 ............... 04~6, /6~,o ..................................... -4000 -4000 -3000 -2000 -1000 0 1000 2000 3000 RECEIVED [)~C - 5 !99~ Alaska 0il a Gas Cons. Commission Anchorage BQP STACK CQNFIGURATION l ~3 5/8", 5000 PS1 WP TRIPLE RAM STACK DRILLING RISER ANNULAR PREVENTER PIPE RAMS I BLIND RAMS t' i 2" KILL LINE MANUAL HYDRAULIC GATE GATE DRILLING SPOOL 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE I " I PIPE RAMS [ "1 I TO DISTRIBUTION TO FLARE CAVIEM UNIT I iSHAIKER 8CREEN CAVIEM UNIT 2 CHOKE MANIFOLD TRIP TANK 1 ?0 BBL FILL LINE · SAND- TRAP 4 BBL c~TRmue~ PIONEER MI( I TO PIT 131BBL VOLUME TANK 137 BBL EQ. 81BBL DEGASSING TANK DESILTER NABOR8 DEQA88ER DFILCO 8EEFLOW TO STAND PIPE & KILL LINE VOLUME TANK 180 BSL SUCTION 117 BBL MUD PUMPS WATER 87 BBL MUD HOPPERS & MIXING PUMPS SUCT~N 134 BBL NABOR$ DflLI.I~G LTD. ' RIG No. 28E MUD SYSTEM SURFACE FAClLITES TOTAL ACTIVE SYSTEM: 800 BBL TOTAl. SURFACE CAPACITY : 970 BBL ** CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE /_~ (1) .Fee. [2 thru ~8 (3) Admi n ;~ ~ 9. '['9 thru 10. [10 & 13] 12. 13. [14 thru 22] 15. (5) BOPE ~..~1£-~-~I [23 thru 28] (6) Other '[~9 thrL~ 31] 16. 17. 18. 19. 20. 21. 22. (6) Addl Company /Z~2~ ~_~ geo 1 ogy' DWJ Lease & Well 1. Is permit fee attached ............................................... YES NO 2. Is well to be located in a defined pool .............................. ~ 3. Is well located proper distance from property line ................... ~ 4. Is wel 1 located proper distance from other wells ..................... ~ 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated & is wellbore plat included ................... 7. Is operator the only affected party .................................. . 8. Can permit be approved before 15-day wait ............................ .~. 23. 24. 25. 26. 27. 28. Does operator have a bond in force ................................... /~)_ Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease ng~nber appropriate .......................................... /~ Does well have a unique name & n~nber ................................ /~ 29. 30. 31. 32. eng i nee r i n~: MTM~f LCS BEW///' P~~ JH ]~, ~/~ Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to~psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. ~ INITIAL GEO1 UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE Additional remarks' O --t -rZ ~O rev 03/29/91 io/6.0] ] Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special 'effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME : ARCO ALASKA, INC. WELL NAME : D.S. 4-41 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292223700 REFERENCE NO : 98190 ICROFILMED LIS Tape V.erifica~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11: 02 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/04/15 ORIGIN : FLIC REEL NAME : 98190 CONTINUATION # : PREVIOUS REEL : COGENT : ARCO ALASKA INC, D.S. 4-41, PRUDHOE BAY, 50-029-22237-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/04/15 ORIGIN : FLIC TAPE NAME : 98190 CONTINUATION # : 1 PREVIOUS TAPE : COI~IENT : ARCO ALASKA INC, D.S. 4-41, PRUDHOE BAY, 50-029-22237-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D . S. 4 - 41 API NUMBER: 500292223700 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 15-APR- 98 JOB NUMBER: 98190 LOGGING ENGINEER: BAILEY OPERATOR WITNESS: ST GE~E SURFACE LOCATION SECTION: 27 TOWNSHIP: 1 iN RANGE: 15E FNL: 149 FSL: FEL: 605 FWL : ELEVATION (FT FROM MSL O) KELLY BUSHING: 60. O0 DERRICK FLOOR: 59. O0 GROUND LEVEL: 27. O0 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 10. 750 3476.0 45.50 2ND STRING 7. 675 9936.0 29.70 3RD STRING 3. 500 9474.0 9.30 PRODUCTION STRING 3. 500 9691.0 9.30 C~VE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Vprifica~ion Listing Schlumberger Alaska Computing Center BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 88888.0 9749.5 9745.5 9738.5 9733.0 9731.0 9728.0 9724.5 9719.0 9715.0 9704.0 9703.5 9701.5 9687.5 9680.0 9677.5 9673.0 9665.5 9660.0 9654.0 9645.5 9640.0 9631.5 9627.0 9623.5 9616.5 9614.0 9612.5 9604.0 9599.0 9598.5 9591.5 9591.0 9587.5 9585.0 9584.5 9579.0 9578.5 9571.0 9564.5 9558.5 9556.5 9550.5 9549.0 9546.0 16-APR-1998 11:02 11 -JAN-92 WESTERN ATLAS .......... EQUIVALENT UNSHIFTED DEPTH GRCH TDTP 88888.5 88887.5 9749.0 9745.0 9738.0 9733.5 9731.5 9729.0 9723.5 9719.0 9715.5 9715.5 9704.5 9704.0 9702.0 9688.0 9687.5 9680.5 9680.5 9677.0 9673.0 9664.5 9659.5 9654.0 9653.5 9643.5 9640.0 9640.0 9631.5 9627.0 9622.5 9624.5 9616.0 9613.5 9613.5 9603.0 9598.5 9598.0 9591.0 9591.0 9587.0 9587.0 9583.5 9584.0 9578.0 9578.5 9569.0 9563.5 9558.0 9558.5 9556.0 9556.0 9550.0 9547.5 9544.5 PAGE: LIS Tape V. erifica~ion Listing Schlumberger Alaska Computing Center 9545.5 9545.0 9539.0 9538.0 9537.5 9537.5 9535.5 9534.0 9525.5 9527.0 9514.0 9517.0 9511.0 9514.5 9506.5 9505.5 9506.0 9505.5 9498.5 9499.0 9496.0 9495.0 9493.5 9492.5 9483.0 9482.0 9475.5 9475.5 9470.5 9469.0 9468.0 9468.0 9466.5 9466.0 9463.0 9462.0 9461.5 9462.0 9456.0 9455.0 9449.0 9449.0 9441.5 9441.5 9436.0 9433.5 9431.5 9431.5 9429.5 9429.0 9425.0 9424.0 9421.5 9422.0 9417.0 9414.0 9415.5 9414.0 9412.5 9409.5 9409.0 9408.5 9405.5 9403.5 9403.5 9404.0 9397.0 9396.5 9393.5 9390.5 9392.5 9390.5 9389.0 9387.5 9383.0 9384.0 9375.5 9374.5 9374.0 9373.0 9372.0 9370.5 9371.5 9370.5 9367.0 9365.5 9364.5 9363.5 9364.0 9363.5 9362.5 9361.5 9358.5 9357.0 9356.0 9354.5 9354.5 9354.5 9353.0 9352.0 9341.0 9339.5 9340.0 9339.5 9330.5 9330.0 9327.5 9325.5 9318.0 9320.0 9308.5 9307.5 16-APR-1998 11:02 PAGE: LIS Tape V.erificat~on Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 9304.0 9303.0 9303.5 9303.0 9296.0 9294.5 9294.5 9294.0 9291 . 5 9292.5 9289.0 9288.5 9287.0 9284.5 9283 . 0 9284.0 9283.0 9278.5 9278.0 9274.0 9274.5 9271.5 9270.0 9266.5 9265.5 9264.5 9265.5 9260.0 9259.0 9257.5 9256.0 9255.0 9253.5 9251.5 9251.5 9248.5 9247.5 9246.0 9243.5 9243.0 9243.5 9242.5 9241 . 5 9228.0 9226.5 9224.0 9222.5 9220.0 9219.5 9219.0 9219.5 9218.0 9216.5 9210.5 9209.0 9204.0 9202.0 9202.0 9202.0 9200.0 9198.5 9197.0 9195.0 9184.0 9183 . 5 9183.5 9178.5 9177.0 9173.0 9171.0 9162.0 9160.5 9157.0 9155.0 9152.0 9150.0 9150.5 9148.0 9149.5 9147.5 9144.0 9142.5 9142.0 9139.0 9138.5 9138.0 9135.5 9133.0 9132.5 9128.5 9127.0 9126.0 9124.5 9124.5 9124.0 9122.5 9120.0 9118.5 9109.5 9108.5 9108.5 9106.5 9104.0 9103.0 100.0 99.0 99.0 REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE TDTP DATA AQUIRED ON ARCO'S DS 4-41 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PAGE: LIS Tape V. erifica~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 BASE PASS #1 AND THE BCS GA~2~A RAY, ALSO BASE PASS #1 SIGMA AND THE BCS GA~IA RAY, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: O . 5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9740.5 9095.0 TDTP 9752.5 9095.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP REMARKS: THIS FILE CONTAINS CASED HOLE TDTP BASE PASS #1. THERE ARE NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. LIS FORMAT DATA LIS Tape V. erifica~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 96 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1066345 SIGM TDTP CU 1066345 TPHI TDTP PU-S 1066345 SBHF TDTP CU 1066345 SBHN TDTP CU 1066345 SIGC TDTP CU 1066345 SIBH TDTP CU 1066345 TRAT TDTP 1066345 LCOi TDTP 1066345 SDSI TDTP CU 1066345 BACK TDTP CPS 1066345 FBAC TDTP CPS 1066345 TCAN TDTP CPS 1066345 TCAF TDTP CPS 1066345 TCND TDTP CPS 1066345 TCFD TDTP CPS 1066345 TSCN TDTP CPS 1066345 TSCF TDTP CPS 1066345 INND TDTP CPS 1066345 INFD TDTP CPS 1066345 GRCH TDTP GAPI 1066345 TENS TDTP LB 1066345 CCr, TDTP V 1066345 GR BCS GAPI 1066345 O0 000 O0 0 1 I 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape V. erifica~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: ** DATA ** DEPT. 9760. 000 SIGM. TDTP -999. 250 TPHI. TDTP -999. 250 SBHF. TDTP SBHN. TDTP -999. 250 SIGC. TDTP -999. 250 SIBH. TDTP -999. 250 TRAT. TDTP LCO1. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999. 250 TCFD. TDTP TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP GRCH. TDTP -999.250 TENS. TDTP -999.250 CCL. TDTP -999.250 GR.BCS DEPT. 9050. 000 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP LCO1. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP GRCH. TDTP -999.250 TENS. TDTP -999.250 CCL. TDTP -999.250 GR.BCS -999 250 -999 250 -999 250 -999 250 -999 250 51 716 -999.250 -999.250 -999.250 -999.250 -999.250 142.352 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SU~VARY LDWG TOOL CODE START DEPTH GRCH 9741.0 TDTP 9753.0 STOP DEPTH 9065.0 9064.0 LIS Tape V. erifica~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH .............. 88888.0 9749.0 9745.0 9738.5 973 6.5 9733.5 9730.5 9727.5 9724.0 9719.5 9717.0 9715.0 9714.5 9711.5 9711.0 9707.5 9703 5 9690 5 9679 5 9677 5 9670 5 9667 5 9662.5 9660.0 9656.5 9655.5 9653.5 9648.0 9646.5 9644.0 9639.0 9634.5 9630.5 9627.5 9623.0 9621.0 9616.5 9612.0 9611.5 9603.5 9601.5 9593.5 9590.5 9587.0 9586.5 .......... EQUIVALENT UNSHIFTED DEPTH GRCH TDTP 88889.0 88888.0 9739.5 9738.0 9736.0 9734.0 9729.0 9723.5 9718.5 9715.5 9713.5 9704.5 9692.0 9680.5 9676.5 9669.0 9660.0 9654.5 9648.0 9640.0 9626.5 9621.0 9613.5 9603.0 9594.5 9586.5 9749.0 9745.0 9734.0 9731.5 9728.5 9718.0 9715.5 9711.0 9708.5 9680.5 9668.5 9663.5 9661.5 9656.0 9653.5 9646.0 9644.5 9635.5 9630.5 9624.5 9616.5 9613.5 9601.5 9591.0 9587.0 LIS Tape V. erificat, ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 9584.5 9584.0 9584.0 9583.5 9578.5 9578.0 9578.0 9579.0 9575.0 9575.0 9570.5 9571.0 9568.5 9569.0 9566.0 9566.0 9564.5 9563.5 9560.0 9561.5 9558.5 9558.0 9555.5 9556.0 9546.0 9545.0 9543.5 9543.5 9540.5 9540.5 9538.5 9538.0 9537.0 9537.5 9528.5 9530.0 9528.0 9527.0 9523.0 9523.0 9513.5 9517.0 9512.0 9513.5 9505.5 9505.0 9504.5 9505.0 9500.0 9499.5 9495.0 9494.5 9493.0 9493.0 9481.5 9481.0 9476.5 9476.5 9472.5 9471.0 9470.0 9469.5 9466.0 9466.0 9463.0 9463.5 9461.0 9462.0 9454.5 9454.0 9452.0 9453.5 9450.5 9450.5 9448.5 9449.0 9447.5 9446.5 9441.0 9441.5 9438.0 9439.0 9435.5 9433.5 9429.5 9429.5 9426.5 9423.5 9426.0 9426.5 9422.0 9422.0 9414.5 9414.0 9413.0 9414.0 9409.5 9407.0 9407.0 9405.5 9403.5 9404.0 9403.0 9401.0 9401.0 9400.0 9400.5 9392.0 9391.0 9389.0 9388.0 LIS Tape V. erifica~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 10 9388 0 9385 5 9385 0 9381 0 9375 5 9373 5 9372 0 9371 0 93 66 5 9364.0 9357.0 9355.5 9354.5 9352.5 9348.5 9342.5 9340.0 9339.0 9334.5 9329.5 9327.0 9314.0 9311.0 9304.5 9302.0 9298.5 9295.5 9295.0 9294.0 9292.5 9288.5 9288.0 9284 0 9283 5 9273 5 9271 0 9268 5 9265 5 9261.0 9256.5 9254.5 9251.5 9248.0 9243.5 9239.5 9235.0 9231.5 9223.5 9219.5 9217.5 9211.5 9208.5 9206.5 9205.5 9202.5 9387.5 9384.0 9382.0 9374.5 93 73.0 9370.0 9365.5 9363.5 9356.5 9354.5 9352.0 9350.0 9341.0 9339.5 9334.5 9330.0 9327.0 9315.0 9303.0 9302.5 9297.5 9295.0 9292.0 9289.0 9287.0 9283.0 9274.5 9270.0 9259.0 9255.5 9253.5 9251.5 9247.0 9239.0 9234.0 9230.5 9222.5 9219.5 9216.5 9210.5 9209.0 9204.5 9384.0 9376.5 9370.5 9363.5 9355.0 9339.5 9332.5 9325.5 9313.0 9294.5 9292.0 9288.0 9282.5 9268.0 9265.5 9256.0 9243.0 9220.0 9212.5 9207.0 9202.5 LIS Tape V?rifica~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 11 9200.0 9198.0 9196.0 9193.0 9191.0 9188.0 9186.5 9184.0 9183.0 9177.0 9174.5 9173.0 9165.5 9162.0 9161 0 9151 5 9149 0 9148 5 9144 0 9143 5 9138 5 9134 0 9132.0 9131.0 9129.0 9128.0 9126.0 9125.5 9121.5 9120.5 9115.5 9114.5 9110.5 9108.5 9108.0 9105.5 9104.0 9099.5 100.0 $ 9198.5 9195.0 9192.0 9189.5 9187.5 9185.0 9183.5 9171.0 9164.5 9160.5 9147.5 9143.5 9140.0 9129.0 9127.0 9124.5 9118.5 9115.5 9106.5 9105.0 9103.0 99.0 9199.5 9197.0 9184.0 9178.0 9174.0 9160.5 9158.5 9150.5 9147.5 9142.5 9138.5 9134.0 9132.0 9129.5 9125.0 9122.5 9114.0 9109.5 9108.0 9097.5 98.0 REMARKS: THIS FILE CONTAINS CASED HOLE TDTP BASE PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH BASE PASS #2 AND GRCH BASE PASS #1, ALSO SIGMA BASE PASS #2 AND SIGMA BASE PASS #1, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ LIS FORMAT DATA LIS Tape V. erifica~,ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 12 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 SIGM TDTP CU 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 SBHF TDTP CU 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 SBHN TDTP CU 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 SIGC TDTP CU 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 SIBH TDTP CU 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT TDTP 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 LCO1 TDTP 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 SDSI TDTP CU 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 BACK TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 TCND TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 TSCN TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 TSCF TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 INND TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 INFD TDTP CPS 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH TDTP GAPI 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 TENS TDTP LB 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 CCL TDTP V 1066345 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape V~erificat, ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 13 * * DA TA * * DEPT. 9753. 000 SIGM. TDTP 16.516 TPHI. TDTP 31. 732 SBHF. TDTP SBHN. TDTP 39. 181 SIGC. TDTP 2. 840 SIBH. TDTP 39.181 TRAT. TDTP LCO1. TDTP 2. 698 SDSI. TDTP O. 493 BACK. TDTP 126. 429 FBAC. TDTP TCAN. TDTP 35315. 992 TCAF. TDTP 13088. 740 TCND. TDTP 25100. 902 TCFD. TDTP TSCN. TDTP 6990.336 TSCF. TDTP 2590. 744 INND. TDTP 1449.336 INFD. TDTP GRCH. TDTP -999.250 TENS. TDTP 1255. 000 CCL. TDTP O. 000 DEPT. 9064. 000 SIGM. TDTP 39. 599 TPHI. TDTP 71 . 527 SBHF. TDTP SBHN. TDTP 56. 691 SIGC. TDTP 1 . 999 SIBH. TDTP 67. 358 TRAT. TDTP LCO1. TDTP 3. 922 SDSI. TDTP 1.200 BACK. TDTP 139. 928 FBAC. TDTP TCAN. TDTP 18130.688 TCAF. TDTP 4173.598 TCND. TDTP 12990.109 TCFD. TDTP TSCN. TDTP 1158. 908 TSCF. TDTP 295. 523 INND. TDTP 1408. 092 INFD. TDTP GRCH. TDTP -999. 250 TENS. TDTP 1160. 000 CCL. TDTP O. 000 30. 823 1. 938 22. 658 7710.368 315. 964 54. 030 1. 970 24. 554 2727. 134 218. 675 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: O . 5000 FILE S~Y LDWG TOOL CODE START DEPTH GRCH 9741.0 TDTP 9753.0 STOP DEPTH 9079.0 9079.5 LIS Tape V. erificat, ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 14 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP 88888.0 88889.0 88888.0 9749.0 9749.0 9745.5 9745.0 9739.0 9738.5 9736.0 9737.0 9733.5 9734.5 9731.0 9735.5 9730.5 9731.5 9727.0 9729.0 9724.5 9725.5 9723.5 9723.5 9714.5 9715.5 9714.0 9715.5 9711.5 9713.5 9710.5 9711.5 9707.0 9708.5 9704.0 9704.5 9702.5 9703.5 9701.5 9701.5 9699.0 9699.5 9687.5 9688.0 9679.5 9680.5 9680.5 9669.5 9669.0 9668.0 9668.5 9663.0 9663.0 9663.5 9657.5 9656.5 9658.0 9653.5 9653.5 9646.5 9646.5 9644.0 9644.5 9639.5 9640.0 9638.0 9639.5 9635.0 9634.5 9631.5 9632.5 9630.0 9631.5 9629.5 9630.5 9623.5 9625.0 9619.0 9618.0 9618.5 9619.5 9615.0 9616.5 9614.5 9613.5 9611.5 9613.5 9607.0 9608.0 9606.0 9607.0 9603.5 9603.0 9600.5 9602.0 LIS Tape V~erificaTion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 15 9599.5 9598.5 9595.5 9596.5 9590.5 9591.0 9587.0 9587.0 9586.5 9587.0 9584.0 9584.0 9578.5 9578.0 9578.0 9577.5 9573.5 9573.5 9570.5 9571.0 9569.0 9570.0 9566.0 9566.0 9564.0 9563.5 9561.0 9561.5 9556.0 9556.0 9545.5 9545.0 9544.0 9544.5 9539.5 9539.0 9538.0 9538.0 9537.0 9537.0 9534.5 9535.5 9534.0 9533.0 9527.5 9528.5 9524.0 9523.5 9518.0 9516.5 9515.5 9514.0 9505.5 9505.0 9504.5 9505.0 9500.0 9499.5 9496.0 9495.5 9493.0 9493.0 9482.0 9481.5 9477.0 9476.5 9472.5 9471 . 0 9463 . 0 9463.5 9462.5 9462.0 9461 . 5 9462.0 9451.0 9450.0 9447.5 9446.5 9445.0 9447.5 9441.0 9441.5 9438.0 9439.0 9435.5 9433.5 9430.0 9429.0 9424.5 9423.0 9423.5 9424.0 9414.5 9414.0 9411.5 9414.0 9407.5 9408.0 9406.0 9404.5 9404.5 9404.0 9402.5 9401.0 9401.0 9400.0 9397.5 9398.0 9397.0 9397.0 LIS Tape V. erifica~.ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11: 02 PAGE: 16 9392.5 9386.0 9377 5 93 73 5 93 67 0 93 64 5 9364 0 9355 5 9352 5 9348.0 9340.0 9339.0 9329.5 9327.0 9326.5 9319.0 9316.5 9310.5 9308.0 9304.0 9303.0 9295.5 9295.0 9293.5 9292.0 9287.5 9286.0 9283.5 9277.5 9273.0 9271.0 92 69.5 9268.0 9266.0 9257.5 9253.0 9250.5 9248 5 9245 5 9242 5 9242 0 9235 0 9231 5 9223.5 9219.0 9218.0 9212.5 9211.5 9203.0 9201.0 9200.0 9196.5 9194.5 9188.0 9184.0 9387.5 9378.0 9373.0 9366.0 9363.5 9355.0 9352.0 9347.0 9339.5 9329.5 9327.0 9319.0 9307.5 9303.0 9294.5 9291.5 9287.0 9285.5 9283.0 9278.0 9270.5 9267.5 9265.5 9256.0 9253.5 9251.5 9247.5 9243.5 9241.5 9234.0 9230. 5 9222.0 9219.5 9210.5 9202.0 9198.5 9195.0 9192.0 9187.5 9391.0 93 63.5 9339.5 9325.5 9321.0 9313.5 9303.5 9294.5 9292.5 9275.0 9270.5 9255.5 9243.0 9219.5 9212.5 9202.0 9184.0 LIS Tape V. erificat, ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 17 9176.0 9173 5 9161 5 9157 0 9153 5 9149 0 9148 5 9143 0 9140 5 9138.5 9136.5 9132.5 9131.0 9128.5 9128.0 9125.5 9125.0 9120.0 9110.5 9108.0 9106.0 9104.0 9100.0 100.0 $ 9174.5 9171.0 9160.5 9155.0 9151.0 9148.0 9147.5 9142.5 9140.0 9138.5 9135.5 9132.5 9132.0 9127.0 9128.0 9125.0 9124.5 9119.0 9111.0 9106.5 9108.0 9104.5 9103.0 9099.5 99.0 99.5 REMARKS: THIS FILE CONTAINS CASED HOLE TDTP BASE PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH BASE PASS #3 AND GRCH BASE PASS #1, ALSO SIGMA BASE PASS #3 AND SIGMA BASE PASS #1, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 LIS Tape V. erifica~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 18 TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 SIGM TDTP CU 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 TPHI TDTP PU-S 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 SBHF TDTP CU 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 SBHN TDTP CU 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC TDTP CU 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH TDTP CU 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 TRAT TDTP 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 LCO1 TDTP 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI TDTP CU 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 TCAN TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 TCAF TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 TCND TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 TCFD TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 TSCN TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 TSCF TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 INND TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 INFD TDTP CPS 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH TDTP GAPI 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 TENS TDTP LB 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 CCL TDTP V 1066345 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9753. 000 SIGM. TDTP 17. 057 TPHI. TDTP 31 . 889 SBHF. TDTP SBHN. TDTP 38. 126 SIGC. TDTP 2.717 SIBH. TDTP 38. 126 TRAT. TDTP LCO1. TDTP 2. 682 SDSI. TDTP O. 562 BACK. TDTP 156. 079 FBAC. TDTP TCAN. TDTP 34151. 344 TCAF. TDTP 12732.162 TCND. TDTP 24318. 695 TCFD. TDTP TSCN. TDTP 6742. 469 TSCF. TDTP 2513. 699 INND. TDTP 1447. 717 INFD. TDTP GRCH. TDTP -999.250 TENS. TDTP 1215. 000 CCL. TDTP O. 000 DEPT. 9079. 000 SIGM. TDTP -999. 250 TPHI. TDTP -999. 250 SBHF. TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP LCO1. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999. 250 TCFD. TDTP TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP 31.398 1. 942 29. 976 7469. 414 313. 021 -999.250 -999.250 -999.250 -999.250 -999.250 LIS Tape V.erificat. ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 19 GRCH. TDTP 76. 063 TENS. TDTP -999.250 CCL. TDTP -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AFUMBER: 4 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, TDTP $ REMARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF PASSES 1,2, &3. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORMAT DATA LIS Tape V. erifica~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 2O ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 84 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 SIGM PNAV CU 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 TPHI PNAV PU-S 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 SBHF PNAV CU 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 SBHN PNAV CU 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 SIGC PNAV CU 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 SIBH PNAV CU 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 TRAT PNAV 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 SDSI PNAV CU 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 BACK TDTP CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 FBAC TDTP CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 TCANPNAV CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 TCAF PNAV CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 TCND PNAV CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 TCFD PNAV CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 TSCN PNAV CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 TSCF PNAV CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 INND PNAV CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 INFD PNAV CPS 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 LCO1 PNAV 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH TDTP GAPI 1066345 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 21 DEPT. 9752 SBHN. PNA V 39 SDS I . PNA V 0 TCAF. PNAV 13220 TSCF. PNA V 2614 GRCH. TDTP -999 DEPT. 9095 SBHN. PNA V 57 SDS I . PNA V 1 TCAF. PNA V 4301 TSCF. PNA V 247 GRCH. TDTP 45 500 SIGM. PNAV 16.520 TPHI.PNAV 429 SIGC. PNAV 2. 699 SIBH. PNAV 483 BACK. TDTP 41 . 992 FBAC. TDTP 279 TCND. PNAV 25215. 551 TCFD. PNAV 667 INND. PNAV 1544.134 INFD. PNAV 25O 32.046 SBHF. PNAV 39.429 TRAT. PNAV 10.887 TCAN. PNAV 7770.660 TSCN. PNAV 334.700 LCO1.PNAV 31.777 1.943 35525.875 7026.205 2.687 000 SIGM. PNAV 42.053 TPHI.PNAV 67.976 SBHF. PNAV 54.896 417 SIGC. PNAV 2.772 SIBH. PNAV 68.773 TRAT. PNAV 1.845 617 BACK. TDTP 109.709 FBAC. TDTP 17.112 TCAN. PNAV 19194.746 123 TClVD.PNAV 12882.646 TCFD.PNAV 2659.913 TSCN. PNAV 957.048 077 INND. PNAV 1480.077 INFD.PNAV 223.006 LCOi. PNAV 3.872 656 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP 9802.0 9091.0 $ LIS Tape V. erificaTion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 22 LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO) 20-DEC-97 CP 44.2 949 20-DEC-97 9789.0 9775.0 9066.0 9753.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY TDTP THERMAL DECAY $ TOOL NUMBER ........... CGRS TND- P C- 3 9 5 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 9936.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CRUDE -25.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED IN TO WA BHC DATED il-JAN-92. THE PURPOSE OF THIS LOG WAS TO DETERMINE IF GAS WAS PRESEN BEHIND THE STRADDLE PACKED INTERVAL, AND TO ESTABLISH A LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 23 BASELINE NEUTRON LOG. DUE TO THE STRADDLE PACKED INTERVAL WITHOUT CEMENT BETWEEN THE TUBING AND LINER, CASING WEIGHT WAS ZONED AS THE SUM OF TUBING AND LINER WEIGHTS. THERE IS NO OBVIOUS GAS IN THE STRADDLE INTERVAL. THIS FILE CONTAINS THE RAW DATA FOR BASE PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 SIGM PS1 CU 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 TPHI PSi PU 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 SBHF PS1 CU 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 SBHNPS1 CU 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 SIGC PS1 CU 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 SIBH PS1 CU 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT PS1 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 LCOi PSi 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 SDEI PS1 CU 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 BACK PS1 CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 FBAC PS1 CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 TCANPS1 CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 24 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TCAF PS1 CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 TCND PSi CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 TCFD PSI CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 TSCN PS1 CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 TSCF PS1 CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 INNDPS1 CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 INFD PS1 CPS 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 1066345 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 1066345 O0 000 O0 0 5 i 1 4 68 0000000000 ** DATA ** DEPT. 9760.000 SIGM. PS1 16.027 TPHI.PS1 34.882 SBHF. PS1 SBHN. PS1 41.074 SIGC. PS1 1.807 SIBH. PS1 41.074 TRAT. PS1 LCO1.PS1 2.743 SDSI.PS1 0.412 BACK. PSi 39.821 FBAC. PS1 TCAN. PS1 36676.102 TCAF. PS1 13371.764 TCND.PS1 26192.168 TCFD.PS1 TSCN. PS1 7262.713 TSCF. PS1 2647.917 INND.PS1 1699.664 INFD.PS1 TENS.PSi 1275.000 GR.PS1 54.750 CCL.PS1 0.000 DEPT. 9092.500 SIGM. PS1 45.038 TPHI.PS1 75.952 SBHF. PS1 SBHN. PS1 55.699 SIGC. PS1 0.310 SIBH. PS1 65.428 TRAT. PS1 LCO1.PS1 4.293 SDSI.PS1 1.593 BACK. PSI 108.418 FBAC. PS1 TCAN. PS1 20283.918 TCAF. PS1 4605.953 TCND.PS1 13310.584 TCFD. PS1 TSCN. PS1 1087.140 TSCF. PS1 253.245 INND.PS1 1482.029 INFD. PS1 TENS.PSI 1200.000 GR.PS1 64.063 CCL.PS1 0.000 35.077 2.003 11.479 7970.121 346.074 56.434 1.995 22.524 2835.092 223.552 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 25 **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUN~ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 9785.5 9060.5 TDTP $ LOG HEADER DATA DATE LOGGED: 20 -DEC- 97 SOFTWARE VERSION: CP 44.2 TIME LOGGER ON BOTTOM: 949 20-DEC-97 TD DRILLER (FT) : 9789.0 TD LOGGER (FT) : 9775.0 TOP LOG INTERVAL (FT) : 9066.0 BOTTOM LOG INTERVAL (FT) : 9753.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : TOOL NUMBER CGRS TND-PC-395 9936.0 CRUDE -25.0 LIS Tape V, erifica=ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 26 FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL).. MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED IN TO WA BHC DATED il-JAN-92. THE PURPOSE OF THIS LOG WAS TO DETERMINE IF GAS WAS PRESEN BEHIND THE STRADDLE PACKED INTERVAL, AND TO ESTABLISH A BASELINE NEUTRON LOG. DUE TO THE STRADDLE PACKED INTERVAL WITHOUT CEMENT BETWEEN THE TUBING AND LINER, CASING WEIGHT WAS ZONED AS THE SUM OF TUBING AND LINER WEIGHTS. THERE IS NO OBVIOUS GAS IN THE STRADDLE INTERVAL. THIS FILE CONTAINS THE RAW DATA FOR BASE PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 LIS Tape V~rificat~ion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 27 TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 SIGM PS2 CU 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 TPHI PS2 PU 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 SBHF PS2 CU 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 SBHN PS2 CU 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 SIGC PS2 CU 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 SIBH PS2 CU 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 TRAT PS2 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 LCO1 PS2 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 SDSI PS2 CU 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 BACK PS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 FBAC PS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 TCANPS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 TCAF PS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 TCND PS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 TCFD PS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 TSCN PS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 TSCF PS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 INND PS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 INFD PS2 CPS 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 1066345 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 9760.000 SIGM. PS2 14.952 TPHI.PS2 25.996 SBHF. PS2 SBHN. PS2 43.214 SIGC. PS2 2.403 SIBH. PS2 43.214 TRAT. PS2 LCO1.PS2 2.435 SDSI. PS2 0.472 BACK. PS2 122.206 FBAC. PS2 TCAN. PS2 31618.801 TCAF. PS2 12987.525 TCND.PS2 23357.746 TCFD.PS2 TSCN. PS2 6236.521 TSCF. PS2 2561.671 INND.PS2 1477.401 INFD. PS2 TENS.PS2 1250.000 GR. PS2 83.125 CCL.PS2 0.000 DEPT. 9062.500 SIGM. PS2 39.522 TPHI.PS2 69.347 SBHF. PS2 SBHN. PS2 54.458 SIGC. PS2 1.510 SIBH. PS2 63.014 TRAT. PS2 LCO1.PS2 3.774 SDSI.PS2 1.235 BACK. PS2 142.750 FBAC. PS2 TCAN. PS2 16286.832 TCAF. PS2 3951.543 TCND.PS2 13191.965 TCFD. PS2 TSCN. PS2 1239.370 TSCF. PS2 328.380 INND.PS2 1340.554 INFD. PS2 36.235 1.794 26.723 7440.563 314.663 47.660 1.963 23.064 2854.803 232.777 LIS Tape ~erificakion Listing Schlumberger Alaska Computing Center 16-APR-1998 11: 02 PAGE: 28 TENS.PS2 1170.000 GR.PS2 54.625 CCL.PS2 0.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 9783.5 9077.0 TDTP $ LOG HEADER DATA DATE LOGGED: 20-DEC-97 SOFTWARE VERSION: CP 44.2 TIME LOGGER ON BOTTOM: 949 20-DEC-97 TD DRILLER (FT) : 9789.0 TD LOGGER (FT) : 9775.0 TOP LOG INTERVAL (FT) : 9066.0 BOTTOM LOG INTERVAL (FT) : 9753.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 29 GR GA~mlA RAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CGRS TND-PC-395 9936.0 CRUDE -25.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED IN TO WA BHC DATED il-JAN-92. THE PURPOSE OF THIS LOG WAS TO DETERMINE IF GAS WAS PRESEN BEHIND THE STRADDLE PACKED INTERVAL, AND TO ESTABLISH A BASELINE NEUTRON LOG. DUE TO THE STRADDLE PACKED INTERVAL WITHOUT CEMENT BETWEEN THE TUBING AND LINER, CASING WEIGHT WAS ZONED AS THE SUM OF TUBING AND LINER WEIGHTS. THERE IS NO OBVIOUS GAS IN THE STRADDLE INTERVAL. THIS FILE CONTAINS THE RAW DATA FOR BASE PASS #3. $ LIS FORMAT DATA LIS Tape ~erific~tion Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 3O ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 SIGM PS3 CU 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 TPHI PS3 PU 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 SBHF PS3 CU 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 SBHN PS3 CU 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 SIGC PS3 CU 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 SIBH PS3 CU 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 TRAT PS3 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 LCO1 PS3 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 SDSI PS3 CU 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 BACK PS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 FBAC PS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 TCANPS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 TCAF PS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 TCND PS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 TCFD PS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 TSCN PS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 TSCF PS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 INND PS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 INFD PS3 CPS 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 1066345 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape V~erification Listing Schlumberger Alaska Computing Center 16-APR-1998 11:02 PAGE: 31 ** DATA ** DEPT. 9760 SBHN. PS3 45 LCO1.PS3 2 TCAN. PS3 28410 TSCN. PS3 5632 TENS.PS3 1215 DEPT. 9079. SBHN. PS3 54. LCO1.PS3 3. TCAN. PS3 18796. TSCN. PS3 1221. TENS.PS3 1130. 000 SIGM. PS3 850 SIGC. PS3 501 SDSI.PS3 680 TCAF. PS3 708 TSCF. PS3 000 GR.PS3 000 SIGM. PS3 993 SIGC. PS3 862 SDSI.PS3 570 TCAF. PS3 622 TSCF. PS3 000 GR.PS3 16.220 TPHI.PS3 2.000 SIBH. PS3 0.501 BACK. PS3 11359.135 TCND.PS3 2252.065 INND.PS3 186.125 CCL.PS3 38.709 TPHI.PS3 2.086 SIBH. PS3 1.237 BACK. PS3 4408.406 TCND. PS3 316.309 INND.PS3 76.500 CCL.PS3 29.800 SBHF. PS3 46.260 TRAT. PS3 158.970 FBAC. PS3 21921.215 TCFD. PS3 1448.448 INFD. PS3 0.000 66.640 SBHF. PS3 64.056 TRAT. PS3 174.493 FBAC. PS3 13198.842 TCFD.PS3 1352.629 INFD.PS3 0.000 39. 019 1. 836 31. 194 6762. 135 284. 591 48. 061 1. 912 28. 894 2840. 719 211. 433 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : 0 O1 CO1 DATE : 98/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/04/15 ORIGIN : FLIC TAPE NAME : 98190 CONTINUATION # : 1 PREVIOUS TAPE : CO~4~ENT : ARCO ALASKA INC, D.S. 4-41, PRUDHOE BAY, 50-029-22237-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/04/15 ORIGIN : FLIC REEL NAME : 98190 CONTINUATION # : PREVIOUS REEL : CO~ff~ENT : ARCO ALASKA INC, D.S. 4-41, PRUDHOE BAY, 50-029-22237-00 (NOTE: **** LIS READ **** MAXIMUM RECORD LENGTH - 8192 BYTES) ** REEL HEADER ** REEL SEQUENCE # 1 SERVICE NAME: SSDS DATE: 92/02/05 ORIGIN OF DATA: DWD REEL NAME: AAI/PBU CONTINUATION #: 01 PREVIOUS REEL NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT RECEIVED MAY 1 1 1992 Alaska 011 & Gas Cons. Commission Anchomge ** TAPE HEADER ** SERVICE NAME: DWD DATE: 92/02/05 ORIGIN OF DATA: 4-42 TAPE NAME: PBU/EOA CONTINUATION #: 01 PREVIOUS TAPE NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ********** END OF FILE (EOF # 1) ********** ** FILE HEADER ** FILE SEQUENCE # 1 FILE NAME: 4-42.MWD SERVICE NAME: DWD VERSION #: NONE DATE: 92/02/05 MAX. RECORD LENGTH: 1024 FILE TYPE: EO PREVIOUS FILE NAME: ** COMMENTS ** COMPANY: FIELD: AREA: WELL: SERVICE: ARCO ALASKA INC. PRUDHOE BAY EOA DRILL SITE 4-42 DWD GAMMA RAY ONLY FROM 8699 TO 9042 FEET MD. TVD DATA CALCULATED FROM DWD SURVEY DATA. ** DATA FORMAT SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 1 4 0 1 68 TVD DWD FT 0 0 0 0 1 4 0 1 68 GR DWD AAPI 0 0 0 0 1 4 0 1 68 ** DATA FORMAT SPECIFICATION ** ENTRY BLoCKs'''~' ~ ~: ~. ~'~ TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 1 4 0 1 68 TVD DWD FT 0 0 0 0 1 4 0 1 68 GR DWD AAPI 0 0 0 0 1 4 0 1 68 DEPT DATA VERIFICATION (every 100 FT) TVD GR 8600.000 -999.250 -999.250 8700.000 8497.090 29.600 8800.000 8591.510 68.690 8900.000 8686.020 17.570 9000.000 8780.609 .81.790 9100.000 -999.250 -999.250 ** 14 DATA RECORDS ** FROM 8600.00 TO 9150.00 FT ** FILE TRAILER** FILE NAME: 4-42.MWD SERVICE NAME: DWD VERSION #: NONE DATE: 92/02/05 MAX. RECORD LENGTH: FILE TYPE: EO NEXT FILE NAME: 1024 ********** END OF FILE (EOF # 2) ********** ** TAPE TRAILER** SERVICE NAME: DWD DATE: 92/02/05 ORIGIN OF DATA: 4-42 TAPE NAME: PBU/EOA CONTINUATION #: 01 NEXT TAPE NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ** REEL TRAILER ** SERVICE NAME: SSDS DATE: 92/02/05 ORIGIN OF DATA: DWD REEL NAME: AAI/PBU CONTINUATION #: 01 NEXT REEL NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ********** TAPE TERMINATED BY REEL TRAILER ********** Tape Subfile 1 is type: LIS **** REEL HEADER **** 921 1120 **** TAPE HEADER **** 92/ 1/20 01 Tape Subfile: 1 Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA 2 records... 04-42 500292222900 ARCO ALASKA INC. ATLAS WIRELINE SERVICES 10-JAN-92 RUN1 RUN2 RUN3 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 97061 BRAD ESARY RUNJE 34 liN 15E 567 457 60.00 59.00 25.00 OPEN HOLE CASING DRILLER' S BIT SIZE (IN) SIZE (IN) DEPTH (FT) R[C[iVFD MAR '] 2 1992 Alaska Oil & Gas Cons. Commission Anchorage 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 0.000 7.875 8724.0 6.750 CIRCULATION STOPPED @ 04-30 26-DEC-92 PICKED TOOL OFF BOTTOM AT 9344' PRIOR TO LOGGING. STARTED LOGGING AT 9337' MAIN PASS. DID NOT TAG BOTTOM ON REPEAT PER COMPANY MAN'S REQUEST. $ **** FILE HEADER **** .001 FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; all runs merged; no case hole data. DEPTH INCREMENT: 0. 5000 FILE SUMMARY PBU TOOL CODE BCS DIL 2435 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA START DEPTH 8724.0 8724.0 8724.0 GR FROM BCS (MEASURED DEPTH) BASELINE DEPTH AC 8738.7 8738.7 8761.5 8812.0 8812.0 8814.0 8815.0 8842.0 8840.0 8850.0 8850.0 8886.5 8926.0 8932.5 8935.5 8939.0 8942.0 8944.0 8950.0 8950.0 8964.0 8962.0 8984.0 8985.0 8990.0 8989.0 8992.0 8992.0 8995.0 9002.0 9026.5 9030.0 9034.5 9045.5 9060.0 9060.0 9062.0 9067.0 9068.0 9068.0 9070.0 9070.0 9102.0 9110.0 9125.0 9149.5 9188.2 9187.5 MERGED DATA SOURCE PBU TOOL CODE RUN NO. BCS 1 DIL 1 2435 1 $ REMARKS: CN : ARCO ALASKA INC. WN : 04-42 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA STOP DEPTH 9308.0 9336.0 9274.0 EQUIVALENT UNSHIFTED DEPTH CNC CLSN CSSN 8761.0 8761.0 8761.0 8886.5 8886.5 8886.5 8925.5 8925.5 8925.5 8934.0 8934.0 8934.0 8938.0 8938.0 8938.0 8940.0 8940.0 8940.0 8943.0 8943.0 8943.0 8944.0 8944.0 8944.0 8990.0 8990.0 8990.0 8993.0 8993.0 8993.0 9002.0 9002.0 9002.0 9026.5 9026.5 9026.5 9032.0 9032.0 9032.0 9036.0 9036.0 9036.0 9046.0 9046.0 9046.0 9064.0 9064.0 9064.0 9069.0 9069.0 9069.0 9103.0 9103.0 9103.0 9111.0 9111.0 9111.0 9125.0 9125.0 9125.0 9149.0 9149.0 9149.0 PASS NO. MERGE TOP MERGE BASE 1 8724.0 9308.0 I 8724.0 9336.0 1 8724.0 9274.0 * FORMAT RECORD (TYPES 64 ) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Tool Code Samples Units 1 DT BCS 68 1 2 FUCT 2435 68 1 3 GR BCS 68 1 4 ILD DIL 68 1 5 ILM DIL 68. 1 6 LL8 DIL 68 1 7 MTEM BCS 68 1 8 NPHI 2435 68 1 9 NUCT 2435 68 1 10 SP BCS 68 1 11 TEND BCS 68 1 12 TENS BCS 68 1 API API API API Log Crv Crv Size Length Typ Typ Cls Mod US/F 4 CPS 4 GAPI 4 OHMM 4 OHMM 4 OHMM 4 DEGF 4 PU-S 4 CPS 4 MV 4 LB 4 LB 4 4 85 618 83 5 4 84 023 70 1 4 67 465 06 6 4 93 412 48 5 4 94 723 20 5 4 39 005 82 1 4 00 513 42 5 4 52 326 75 5 4 83 368 34 1 4 13 465 75 5 4 56 053 87 1 4 56 053 87 1 * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 66 Tape File Start Depth = 9346.000000 Tape File End Depth = 8724.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 16186 datums Tap? Subfile: 2 178 records... Minimum record length: 62 bytes Maximum record length: 994 bytes 48 Tape Subfile 3 is type: LIS **** FILE HEADER **** .002 FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT'. 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH 2435 8442.0 8724.0 $ BASELINE CURVE FOR SHIFTS: GR FROM BCS CURVE SHIFT DATA (MEASURED DEPTH) - EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ REMARKS: CN WN FN COUN STAT NO DEPTH SHIFTS REQUIRED. $ : ARCO ALASKA INC. : 04-42 : PRUDHOE BAY : N. SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 FUCT 2435 68 1 CPS 4 2 GRCH 2435 68 1 GAPI 4 3 MTEM 2435 68 1 DEGF 4 4 NPHI 2435 68 1 PU-S 4 5 NUCT 2435 68 1 CPS 4 6 TEND 2435 68 1 LB 4 7 TENS 2435 68 1 LB 4 4 84 023 70 1 4 08 501 10 0 4 18 487 70 6 4 52 326 75 5 4 83 368 34 1 4 19 912 29 5 4 19 912 29 5 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 19 Tape File Start Depth = 8724.000000 Tape File End Depth = 8442.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4521 datums Tape Subfile: 3 45 records... Minimum record length: 62 bytes Maximum record length: 998 bytes 28 Tape Subfile 4 is type: LIS **** FILE HEADER **** .003 FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 1 0.2500 VENDOR TOOL CODE START DEPTH mmmmmmmm! B~O 2435 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): 8724.0 8724.0 8446.0 STOP DEPTH mmmmmmmmmm 9337.0 9308.0 9280.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS MODL TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB MODAL SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR ACOUSTIC LOG DUAL INDUCTION FOCUS BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: 26-DEC-91 FSYS 256 REV:G002 VER:2 430 26-DEC-91 1019 26-DEC-91 9337.0 9344.0 8724.0 9308.0 1500.0 TOOL NUMBER 3974 3967 3517 2806 1309 2435 3506 1609 1503 6.750 8724.0 8724.0 LSND 9.20 43.0 8.9 5.8 150.6 1.830 0.916 2.100 0.000 2.200 72.0 150.6 72.0 0.0 72.0 MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 04-42 : PRUDHOE BAY : N. SLOPE : ALASKA 0.000 THERMAL SANDSTONE 0.00 0.000 0.0 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool Code Samples Units 1 AC AC 68 1 2 ACQ AC 68 1 3 CFOC DIFL 68 1 4 CHT 68 1 5 CILD DIFL 68 1 6 CILM DIFL 68 1 7 CLSN 2418 68 1 8 CN 2418 68 1 9 CNC 2418 68 1 10 CSSN 2418 68 1 11 GR GR 68 1 12 RFOC DIFL 68 1 13 RILD DIFL 68 1 14 RILM DIFL 68 1 15 SP DIFL 68 1 16 SPD 68 1 17 TEMP TEMP 68 1 18 TT AC 68 1 19 TTEN 68 1 US/F MMHO LB MMHO MMHO CPS PU-L PU-S CPS GAPI OHMM OHMM OHMM F/MN DEGF MS LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 48 852 89 1 4 4 81 285 47 0 4 4 88 340 32 5 4 4 94 017 77 6 4 4 34 704 23 6 4 4 33 393 51 6 4 4 27 466 87 5 4 4 31 149 96 6 4 4 86 720 65 6 4 4 28 122 23 5 4 4 21 990 60 6 4 4 27 515 24 6 4 4 04 903 06 0 4 4 06 213 78 0 4 4 53 419 67 0 4 4 59 553 77 6 4 4 06 033 97 0 4 4 56 290 40 5 4 4 94 017 77 6 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 302 Tape File Start Depth = 9346.000000 Tape File End Depth = 8442.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 88527 datums Tape Subfile: 4 381 records... Minimum record length 62 bytes Maximum record lengthl 966 bytes 76 Tape Subfile 5 is type: LIS **** FILE HEADER **** .004 FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 2 0.2500 VENDOR TOOL CODE START DEPTH DIFL 8724.0 RCS 8724.0 2435 8680.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS MODL TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB MODAL SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR ACOUSTIC LOG DUAL INDUCTION FOCUS BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: STOP DEPTH 9280.0 9280.0 9280.0 26-DEC-91 FSYS 256 REV:G002 VER:2 430 26-DEC-91 1116 26-DEC-91 9337.0 9344.0 8446.0 9280.0 1500.0 TOOL NUMBER 3974 3967 3517 2806 1309 2435 3506 1609 1503 6.750 8724.0 8724.0 LSND 9.20 43.0 8.9 5.8 150.6 1.830 0.916 2.100 0.000 2.200 0.000 72.0 150.6 72.0 0.0 72.0 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REF~S: CN WN FN COUN STAT : ARCO ALASKA INC. : 04-42 : PRUDHOE BAY : N. SLOPE : ALASKA THERMAL SANDSTONE 0.00 0.000 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool Code Samples Units 1 AC AC 68 1 2 ACQ AC 68 1 3 CFOC DIFL 68 1 4 CHT 68 1 5 CILD DIFL 68 1 6 CILM DIFL 68 1 7 CLSN 2418 68 1 8 CN 2418 68 1 9 CNC 2418 68 1 10 CSSN 2418 68 1 11 GR GR 68 1 12 RFOC DIFL 68 1 13 RILD DIFL 68 1 14 RILM DIFL 68 1 15 SP DIFL 68 1 16 SPD 68 1 17 TEMP TEMP 68 1 18 TT AC 68 1 19 TTEN 68 1 US/F MMHO LB MMHO MMHO CPS PU-L PU-S CPS GAPI OHMM OHMM OHMM F/MN DEGF MS LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 48 852 89 1 4 4 81 285 47 0 4 4 88 340 32 5 4 4 94 017 77 6 4 4 34 704 23 6 4 4 33 393 51 6 4 4 27 466 87 5 4 4 31 149 96 6 4 4 86 720 65 6 4 4 28 122 23 5 4 4 21 990 60 6 4 4 27 515 24 6 4 4 04 903 06 0 4 4 06 213 78 0 4 4 53 419 67 0 4 4 59 553 77 6 4 4 06 033 97 0 4 4 56 290 40 5 4 4 94 017 77 6 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 214 Tape File Start Depth = 9288.000000 Tape File End Depth = 8648.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 55742 datums Tape Subfile: 5 291 records... Minimum record length: 62 bytes Maximum recordlength: 966 bytes 76 Tape Subfile 6 is type: LIS **** TAPE TRAILER **** 921 1/20 O1 **** REEL TRAILER **** 92/ 1/20 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 20 JAN 92 2:16p Elapsed execution time = 37.73 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 1 is type: LIS **** REEL HEADER **** 92/ 1/10 O1 **** TAPE HEADER **** 92/ 1/10 01 Tape Subfile: 1 Minimum record length: Maximum record length: 2 records... 132 bytes 132 bytes RECEIVED FEB 03 199;~ Alaska 011 & Gas Cons. Commission Anchorage Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA 04-42 500292222900 ARCO ALASKA INC. ATLAS WIRELINE SERVICES 10-JAN-92 RUN1 RUN2 RUN3 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 97061 BRAD ESARY RUNJE 34 liN 15E 567 457 60.00 59.00 25.00 OPEN HOLE CASING DRILLER' S BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 0.000 7.875 8724.0 6.750 CIRCULATION STopPED 04-30 26-DEC-92 PICKED TOOL OFF BOTTOM AT 9344' PRIOR TO LOGGING. STARTED LOGGING AT 9337' MAIN PASS. DID NOT TAG BOTTOM ON REPEAT PER COMPANY MAN'S REQUEST. $ **** FILE HEADER **** .001 1024 FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; all runs merged; no case hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE 0.5000 START DEPTH STOP DEPTH DIL 8724.0 BCS 8724.0 2435 8724.0 $ BASELINE CURVE FOR SHIFTS: GR FROM BCS CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BCS DIL 2435 $ REMARKS: 9337.0 9308.0 9217.0 EQUIVALENT UNSHIFTED DEPTH RUN NO. PASS NO. 1 1 1 1 0 0 CN WN FN COUN STAT NO DEPTH SHIFTS REQUIRED. $ : ARCO ALASKA INC. : 04 -42 : PRUDHOE BAY : N. SLOPE : ALASKA MERGE TOP MERGE BASE 1.0 0.0 1.0 0.0 0.0 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 DT BCS 68 1 US/F 2 FUCT 2435 68 1 CPS 3 GR BCS 68 1 GAPI 4 ILD DIL 68 1 OHMM 5 ILM DIL 68 1 OHMM 6 LL8 DIL 68 1 OHMM 7 MTEM BCS 68 1 DEGF 8 NPHI 2435 68 1 PU-S 9 NUCT 2435 68 1 CPS 10 SP BCS 68 1 MV 11 TEND BCS 68 1 LB 12 TENS 68 1 LB * DATA RECORD (TYPE# 0) 994 BYTES * 4 85 618 83 5 4 84 023 70 1 4 67 465 06 6 4 93 412 48 5 4 94 723 20 5 4 39 005 82 ~1 4 O0 513 42 5 4 52 326 75 5 4 83 368 34 1 4 13 465 75 5 4 56 053 87 1 4 94 017 77 6 48 Total Data Records: 66 Tape File Start Depth = 9346.000000 Tape File End Depth = 8724.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 16186 datums Tape Subfile: 2 145 records... Minimum record length: Maximum record length: 62 bytes 994 bytes :sp~ooa~ ~G I~o~ 866 (0 GHOO~H ~¥G ~ ££ £I0 ~6 ~ A8 ~G0 9§ ~ 90 G9~ &9 ~ 0£ ~E0 ~8 ~ AN SdO I 89 SNMA I 89 $0~ GNmA 9 I 89 SD~ dS I 89 G£~E ~3~N I 89 §£~g IHdN I 89 SD~ HD~D I 89 ~ ~O~ I pon sIO dX~ dX~ qsbua% az!s AID AaO 6o~ Id¥ Id~ Id¥ Id~ s~!u~ s~Id~s apoo IOOl amen :SaAlnO £ ~ :GI q~dap ad~i ,"4'ld'~d.4 %Iad HAd,q(] ."4NO ~S~q~ : ~dO~S 'N : X~ ~OHQQ~d : Z~-~0 : 'DNI ~SWq¥ OO~V : 'G.~I~%{ SJ.4IHS HJ,d.~G ON NflOO N~ NM ND H~d~G G~A~IHSNI1 SD~ NO~ ~9 :SA~IHS ~O~ ~A~D 0'~EL8 0'E~8 H~8~G 80~S H~d~G AHemS ~GOD ~OO~ 000G'0 :IN~N~DNI I :~NiIN SS~d · 6u~s~D ogu~ una s6oI aIOg uado ao$ sa^anD padd~ID pu~ pagings ggdaG SS~d NI~4 ~OH G~S~D E :~~N ~I~ ~G~H ~I~ ~EOI E00 ' SI~ :odX$ sT ~ OlT~gns Tape File Start Depth = 8724.000000 Tape File End Depth = 8442.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4521 datums Tape Subfile: 3 45 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 4 is type: LIS **** FILE HEADER **** .003 1024 FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH DIFL 8724.0 BHC 8724.0 2435 8446.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 9337.0 9308.0 9280.0 26-DEC-91 FSYS 256 REV:G002 VER:2 430 26-DEC-91 1019 26-DEC-91 9337.0 9344.0 8724.0 9308.0 1500.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS MODL TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB MODAL SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR ACOUSTIC LOG DUAL INDUCTION FOCUS TOOL NUMBER 3974 3967 3517 2806 1309 2435 3506 1609 1503 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 6.750 8724.0 8724.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 04-42 : PRUDHOE BAY : N. SLOPE : ALASKA LSND 9.20 43.0 8.9 5.8 150.6 1.830 0.916 2.100 0.000 2.200 0.000 THERMAL SANDSTONE 0.00 0.000 0.0 72.0 150.6 72.0 0.0 72.0 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Tool Code Samples Units 1 AC AC 68 1 US/F 2 CHT 68 1 LB 3 CLSN 2418 68 1 CPS 4 CNC 2418 68 1 PU-S 5 CSSN 2418 68 1 CPS 6 GR GR 68 1 GAPI 7 RFOC DIFL 68 1 OHMM 8 RILD DIFL 68 1 OHMM 9 RILM DIFL 68 1 OHMM 10 SP DIFL 68 1 MV 11 TEMP TEMP 68 1 DEGF 12 TTEN 68 1 LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 48 852 89 1 4 94 017 77 6 4 27 466 87 5 4 86 720 65 6 4 28 122 23 5 4 21 990 60 6 4 27 515 24 6 4 04 903 06 0 4 06 213 78 0 4 53 419 67 0 4 06 033 97 0 4 94 017 77 6 * DATA RECORD (TYPE# 0) Total Data Records: 191 994 BYTES * 48 Tape File Start Depth = 9346.000000 Tape File End Depth = 8442.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 63208 datums Tape Subfile: 4 270 records... Minimum record length: Maximum record length: 62 bytes 994 bytes GNS~ O'~[L8 O'~EL8 O§L'9 £0~I 609I 90§£ 60CI 908E L96£ 9L6£ qOO~ 0'00~I 0'08E6 0'9998 0'~9~6 0'Lgg6 I6-DMG-9E 9III I6-O~G-9E E:~A E00~:A~ 9~E SAS~ I6-DH~-9E SNOIiIGNOD :(A~) HAd3G 9NIS~D :(A~) HAd~G DNISVD S,~IRG :(NI)3ZIS AIR ~OH N~dO ~A¥~ DNIS~D GN~ ~OH~MO~ SflOO.~ NOIJ,DflGNI q~fflG Doq~ OI&SflOO%f %IO,T,%f~IflGO~ .qGOO NOMJ, fl.qN G.WJ,~fSN.q dNOO .qMfl,I, knd.q dN.q,T, ~flS ~flS NOI,T,k~IOSI SSkn~4 NOI SNH.T. ~%f.qH.q~I8%fD NDd ND ~IGOM SIM ~HD MdAA ~OOA MGOD ~OOA HOGNMA (NOAA08 OA dOA) DNIMAS ~OOA 0'08E6 0'0898 0'08E6 0'~EL8 0'08E6 0'~EL8 : (MHd~) GMMdS 9NIODOq :(~) ~VAMMINI 90% NOAAOM ' (~) ~AM~NI 90~ dO~ :(~) ~I~G GA :~OAAO~ NO ~O~ ~IA :G~GN~ NOIA~D~ID :NOIS~A ~WMA~OS ~IG HIdEG dOAS HAdMG AMVAS 3GOD ~OOA MOGNMA 00~E'0 :£NMNMMDNI E :~SWIIN SS~d I :MM~IflN ONIMAS I :MM~WI1N N~M 'SalT~ a$~a~das uTuna pu~ '6UTa~S IOO~ 'ss~d qo~a aog ~p aap~aq 6oi pu~ S~A2nO ~g0I ~00 ' SIq :adX~ s! G aI!~gns MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 04-42 : PRUDHOE BAY : N. SLOPE : ALASKA 9.20 43.0 8.9 5.8 150.6 1.830 0.916 2.100 0.000 2.200 0.000 THERMAL SANDSTONE 0.00 ~0.000 0.0 72.0 150.6 72.0 0.0 72.0 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 AC AC 68 1 US/F 2 CHT 68 1 LB 3 CLSN 2418 68 1 CPS 4 CNC 2418 68 1 PU-S 5 CSSN 2418 68 1 CPS 6 GR GR 68 1 GAPI 7 RFOC DIFL 68 1 OHMM 8 RILD DIFL 68 1 OHMM 9 RILM DIFL 68 1 OHMM 10 SP DIFL 68 1 MV 11 TEMP TEMP 68 1 DEGF 12 TTEN 68 1 LB 4 48 852 89 1 4 94 017 77 6 4 27 466 87 5 4 86 720 65 6 4 28 122 23 5 4 21 990 60 6 4 27 515 24 6 4 04 903 06 0 4 06 213 78 0 4 53 419 67 0 4 06 033 97 0 4 94 017 77 6 * DATA RECORD (TYPE# 0) 994 BYTES * 48 Total Data Records: 135 Tape File Start Depth = 9288.000000 Tape File End Depth = 8648.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 37815 datums Tape Subfile: 5 212 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 6 is type: LIS **** TAPE TRAILER **** 92/ 1/10 01 **** REEL TRAILER **** 92/ 1/10 O1 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 9 JAN 92 8:36a Elapsed execution time = 26.53 seconds. SYSTEM RETURN CODE = 0