Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-166 0112512007 Schlußlberger NO. 4125 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 í~ l!jO éJQI-/6G Field: Prudhoe Bay II D t BL CD CI J b# L D Of We 0 og escnp110n ae o or P2-37A 11491392 MEM PROD PROFILE 11/15/06 1 Y-23B 11418299 MEM PROD PROFILE 09/06/06 1 NK-07 A 11588698 MEM GLS 12/21/06 1 07-01A 11555031 GAS ENTRY SURVEY 12/19/06 1 NK-08A 11485780 MEM GLS 12/20/06 1 NK-27 11588699 MEM GLS 12/22/06 1 NK-43 11513659 PRODUCTION PROFILE 12/22/06 1 DS 09-32 11555530 INJECTION PROFILE 12/16/06 1 P2-14 11539745 MEM PROD PROFILE 12/07/06 1 Y-05A 11539744 MEM INJECTION PROFILE 12/06/06 1 S-02Ä 11285936 MEM PROD PROFILE 08/17/06 1 12-32 11536184 USIT 12/05/06 1 MPS-10A 11486087 COMPOSITE WFLlLDL 12/14/06 1 Z-19A 11226013 SCMT 10/28/06 1 Y-30L 1 11588700 MEM PROD PROFILE 12/23/06 1 E-11B 11434757 DSI 10/24/06 1 E-11 B 11434760 DSI 10/29/06 1 E-11B 11434760 FMI 10/29/06 1 G-14A 11485777 MEM PROD PROFILE 11/27/06 1 G-14A 11485777 SCMT 11/27/06 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. C""A"'~II:::r\ JAN f.) 0 ?007 Petrotechnical Data Center LR2-1 ~~ c) t.. 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage. AK 99503-2838 ATTN: Beth Date Delivered: Received by: (\ . . . . MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc Permit to Drill 2011660 MD 10351 '"' TVD REQUIRED INFORMATION DATA SUBMITTAL COMPLIANCE REPORT 8~25~2003 Well Name/No. PRUDHOE BAY UNIT Y-30L1 Operator BP EXPLORATION (ALASKA) INC 9016 Completion Dat 8/29/2001 --~ Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-22135-60-00 Mud Log N.~o Sample N_.9 Directional Survey N__.9o DATA INFORMATION Types Electric or Other Logs Run: (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Interval Data Digital Digital Log Log Run OH / Dataset Type Media Fmt Name Scale Media No Start Stop CH Received Number Comments ED D Ver LIS Verification 1 9095 10351 Open 1/18/2002 10535 Well Cores/Samples Information: Interval Dataset Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y / N Chips Received? Y / N Analysis Y / N R~.cP. ivP. d? Daily History Received? Y / N Formation Tops ~ N Compliance Reviewed By: Transmittal Form BAKER HUGHES Baker Atlas Canada GEOSciences Centre To: State of Alaska, Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Attention: Lisa Weepie Reference: Y-30L1 Prudhoe Bay Unit ....... .~.o../,..!..¢....¢. ...................................................................................................... Contains the following: 1 LDWG format disk 1 listing 1 set films (3 films: GR MD, Resistivity MD and TVD) 1 set prints (3 prints: GR MD, Resistivity MD and TVD) RECEIVED JAN I 8 2002 A~a~ka Oil & Gas Cons. Commi~on LAC:16345 Sent By: Iuliana Craiciu Received By~ ~ Date: Jan 16,2002 Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (403) 537-3767 Baker Atlas #1300, 401-9th Ave. S.W. Calgary, Albert a, Canada T2P 3C5 " Direct: (403) 53%3752 FAX: (403) 537-3767 ~" ..~ "-.' '"'"~Z ,,. i~ , .~ :.,,:,,.,:,: .: ~ ........ ~L.,...~,.,,,~,(,L .,.,,,-'"'"'-'&';;;; . . · . 22L..,~[~L....;..~.....LL ?_ ........ :.: ................ ....... % ..................... ............................... ~ ....................... .......... "~ -4~:7--' . ---~t-. ............... ,,_, .... STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service [] TSUSP 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 201-166 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22135-60 4. Location of well at surface i' , ~ ........ !. ~,., , _._-.---,.,-- . 9. Unit or Lease Name 1357' SNL, 43' EWL, SEC. 34, T11 N, R13E, UM ~ .... "'- ¢, ' Prudhoe Bay Unit At top of productive interval 1101' SNL, 1127' WEL, SEC. 33, T11 N, R13E, UM.'.. '~ . At total depth ! ~"~._ ''Is:~ 10. Well Number 1899' SNL, 1765' WEL, SEC. 33, T11N, R13E, UM IL'.7~..-~'~'.-.~::::¥;~:!. ....~~ Y-30L1 ~~ 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE = 87.27' ADL 028287 12. Date Spudded 8/21/2001 113' Date T'D' Reached 114' Date COmp'' Susp'' Or Aband' 8/27/2001 8/29/2001 115' Water depth' if OffshOre N/A MSLI116' N°' °f C°mpleti°ns One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of permafrost 10351 9016 FTI 10351 9016 FTI [] Yes [] NoI (Nipple) 2076' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, Memory CNL 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" Surface 110' 10-3/4" 40,5# L-80 38' 2706' 13-1/2" 2304 cuft CS II1~ 1056 cu ft CS II 7-5/8" 29.7# L-80 35' 9064' 9-7/8" 1268 cu ft Class 'G' 5-1/2" 17# NT80 8815' 9100' 6-3/4" 152 cu ft Class 'G' 2-7/8"x2-3/8" 6.16# / 4.6# L-80 8794' 9600' 3-3/4" Uncemented Slotted Liner 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-7/8" Slotted Liner 2-3/8" Slotted Liner 4-1/2", 12.6#, L-80 8814' 8724' MD TVD MD TVD 8828' - 8860' * 8637' - 8668' 9272' - 9561' 9029' - 9079' 9205' - 9269' 8986' - 9027' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 3-3/4" Open Hole 9100 Set Flow-Through Whipstock · - This interval 2000' Freeze Protected with 60/40 MeOH ended up above 9600' - 10351' 9082' - 9016' the window. 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) September 4, 2001 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO 9/19/2001 1.95 TEST PERIOD 1444 2209 3370 89.83I 1530 Flow Tubing Casing Pressure CALCULATED OIL'BBL GAS'MCF WATER'BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED OCT 0 4 7_001 {~ D t {~-, 1 k ! 4. I Alaska 0il & Oas Cons. Commissi0, Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered Depth Depth and gravity, GOR, and time of each phase. Shublik 'A' 9117' 8913' Shublik 'B' 9160' 8951' Shublik 'C' 9184' 8970' Sad lerochit 9217' 8995' 45N 9240' 9010' 45P 9245' 9014' 44N 9324' 9049' 44P 9333' 9051' HOT 9515' 9075' RECEIVED 43P 9600' 9082' OCT 0 Alaska Oil & Gas Cons, Commission Anchoraoe '311 LiSt Of Attachmentsl summary ofI Dlaily Drilling Reports, Surveys 1'3~.'"l I~ 'ereb'y Certify that thio foregoing listrue--and correct to the best of' mY knowledge ' ' Signed TerrieHubble ~'~ Title TechnicalAssistant Date Y-30L1 201-166 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ~'J !-"~ I l"~ l i'~'~'!i~'~"~ L-, Well: Y-30L1 Rig Accept: 08/18/01 Field: Prudhoe Bay Unit Rig Spud: 08/21/01 APl: 50-029-22135-60 Rig Release: 08/29/01 Permit: 201-166 Drillin~l Rig: CDR-1 PRE-RIG WORK 08/11/01 Set Baker IBP with check valve at 9125'. 08/12/01 Set TIW whipstock at 9100', oriented 6 degrees right of top. BP EXPLORATION Page 1 of 5 Operations Summa Report Legal Well Name: Y-30 Common Well Name: Y-30L1 Spud Date: 2/17/1991 Event Name: REENTER+COMPLETE Start: 8/17/2001 End: 8/29/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/29/2001 Rig Name: CDR-1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/17/2001 12:00 - 00:00 12.00 RIGU P PRE Move rig components to Y-30L1 location. Level and lay Herculite. Move camp. RU. 8/18/2001 00:00 - 18:30 18.50 RIGU P PRE PJSM. RU. CIO coil tubing spools. 18:30 - 09:00 14.50 RIGU P PRE Install reel brake and idler arm. 09:00 - 10:30 1.50 RIGU P PRE Weld / spice coil, install weld on connection. 10:30 - 00:00 13.50 RIGU P PRE ND/NU. Rig accepted on Daywork at 22:30 hrs - Aug. 18, 2001 8/19/2001 00:00 - 00:30 0.50 BOPSUR P DECOMP Finish NU BOPE. 00:30 - 02:30 2.00 BOPSUR P DECOMP RU lubricator and pull BPV. Install TWC. 02:30 - 03:30 1.00 BOPSUR P DECOMP RU to test BOPE. Grease choke manifold & stack valves. 03:30 - 10:30 7.00 BOPSUR P DECOMP Test BOPE to 250/3500 psi. Witnessing of test waived by AOGCC Rep J. Jones. 10:30 - 11:30 1.00 BOPSUB P DECOMP RU lubricator and pull TWC. 11:30 - 16:50 5.33 KILL P DECOMP RU, RIH and circ out FP from 2,200'. Recv. methanol, gas and tr oil. 16:50 - 17:15 0.42 KILL P DECOMP Cont. in hole to 4,575' circ .65 bpm. Initial alarm sounded. Fluid return density dropped. 17:15 - 17:45 0.50 KILL P DECOMP Cont. in hole to 5,000'. H2S alarm sounded, 40ppm H2S max. gas recorded. Evacuated rig of non-essential personnel. Intermitant alarms. Accounted for all personnel. 17:45 - 18:00 0.25 KILL P DECOMP Monitor well while circ. Informed crew change personnel to remain upwind and in the tool house. 18:00 - 18:45 0.75 KILL P DECOMP Divert returns to tank outside rig, cont. in hole to 7,200' circ. at 1.3 bpm. Ruturns were gas cut. Shut well in due to Iow KCl vols. Safety team put on air packs and "sniffed" rig using Buddy system. 18:45 - 20:30 1.75 KILL P DECOMP Safety shut-in. Notify: Jeff Jones-AOGCC, AD&W-HSE, Pad operator, NABORs HSE. Simultaneous operations personel, fluids haulers, other trucks informed to standby on "H" pad, or leave area. All doors on rig left open. 20:30 - 22:30 2.00 KILL P DECOMP PJSM w/HSE safety, equipped all rig personnel with H2S monitors. Had additional air bottles brought to rig to replace depleted bottles. Additional "sniffers", w/extensions brought to location. Sniff the rig and tank w/AD&W-HSE personnel. Zero :ppm H2S detected. Take on additional KCI. 22:30 - 23:00 0.50 KILL P DECOMP :WI non-essential pers. remaining in safe area, open well to outside tank. Circ at .5 bpm. RIH to 8,809' (-9' corr.) and CBU. Mill SVN. (gas cut mud until 50 bbls up, then little or no gas). 23:00 - 00:00 1.00 KILL P DECOMP . RIH to 9,091' and tag top of liner (+9' corr.). CU, taking returns to the pits. Gas cut mud for first 15 bbls up, and then little or no gas with equal mud density in/out. 8/20/2001 00:00 - 01:00 1.00 KILL P DECOMP, Switch to outside tank to circulate out gas and tr oil. Shut-in and take on more KCI to finish circulation. 01:00 - 02:15 1.25 KILL 3 DECOMP 'Switch back to circulating thru the mud system. CBU, no gas, and density in/out equal. No gas alarms sounded. :02:15 - 03:00 0.75 KILL 3 DECOMP Inspect cellar, tanks, rig using "buddy system" team with sniffers. No H2S detected. Held PJSM/Pre-spud mtg. 03:00 - 05:15 2.25 STWHIP 3 WEXlT ~ Mill window with 5 bbl biozan sweeps. 05:15 - 05:45 0.50 STWHIP 3 WEXlT Lost, 200psi of pump pressure, PU, RIH to btm and had motor work. Drilloff, PU, and lost an additional 80 psi. Check surface equipment. 05:45 - 07:30 1.75 STWHIP N DFAL WEXlT POOH to inspect/test BHA for possible washouts. Inspect Printed: 9/4/2001 5:05:48 PM BP EXPLORATION Page 2 of 5 Operations Summary Report Legal Well Name: Y-30 'Common Well Name: Y-30L1 Spud Date: 2/17/1991 'Event Name: REENTER+COMPLETE Start: 8/17/2001 End: 8/29/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/29/2001 Rig Name: CDR-1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/20/2001 05:45 - 07:30 1.75 STWHIP N DFAL WEXlT tools. No washouts found in tool threads. Mud dripping from motor head assembly, chg same. 07:30 - 08:30 1.00 STWHIP N DFAL WEXlT RIH. sht @ 500' - ok. 08:30 - 11:00 2.50 STWHIP N DFAL WEXlT RIH 11:00 - 17:00 6.00 STWHIP P WEXlT Mill window and drill to 9,116'. Circ clean and displ hole w/ FLO-PRO mud system. 17:00 - 19:00 2.00 s'rVVHIP P WEXlT POOH, Rack Back Inj. 19:00 - 22:30 3.50 DRILL P PROD1 PJSM. CIO BHA to Build Motor assembly, surface test Orienter, plug in and connect USMPR - okay. 22:30 - 00:00 1.50 DRILL P PROD1 RIH to 500', sbt - okay. 8/21/2001 00:00 - 01:00 1.00 DRILL P PROD1 RIH to EOP flag. Correction (+12'). 01:00 - 02:30 1.50 DRILL P PROD1 RIH thru window OK. RIH to bottom @ 9117'. 02:30 ~ 11:30 9.00 DRILL P PROD1 Orient and drill build section per plan to 9334' MD. No mud losses observed during drilling. 11:30 - 12:00 0.50 DRILL P PROD1 POH for new BH^. Started losing circ when bringing pump back on after pulling thru window. 12:00 - 12:30 0.50 DRILL N DPRB PROD1 Circ at 1.5 bpm in/0 bpm out, 2.5 bpm in/1.2 bpm out, 1.0 bpm in/0.2 bpm out. 12:30 - 17:00 4.50 DRILL N DPRB ' PROD1 Order out additional 200 bbl FIo-Pro from M-I. Discuss situation with Anch DE. Suspect inflatable packer & check valve assembly may have failed, exposing perfs below. Agreed to mix v. high LSRV perf pill and spot downhole in attempt to seal off drinking perfs. Mix same to 200K LSRV. Spot high LSRV(200K) pill @ whipstock. POH and circ above pill to squeeze away same. 17:00 - 19:00 2.00 DRILL P PROD1 Con't POH for new BHA. 19:00 - 21:00 2.00 DRILL P PROD1 L/D BHA # 2 & download restivity tool. P/U BHA # 3. 21:00 - 22:00 1.00 DRILL P PROD1 RIH to 500' & shallow test MWD # 4 - OK. 22:00 - 00:00 2.00 DRILL P PROD1 Con't RIH to 8935'. Note - Fluid loss during trip in hole = minimal. 8/22/2001 00:00 - 01:00 1.00 DRILL P PROD1 Con't RIH f/8935' to 9335'. 01:00 - 05:30 4.50 DRILL P PROD1 Directional drill 3 3/4" hole f/9334' to 9608'. Fluid loss remain constant @ +/- 20 - 30 Bbls per hr. 05:30 - 06:00 0.50 DRILL P PROD1 Wiper trip f/9608' into window @ 9100' & return to TD. No problems on wiper trip. 06:00 - 10:30 4.50 DRILL P PROD1 Directional drill 3 3/4" hole f/9608' to 9811'. Fluid loss remain constant @ +/- 20 - 30 Bbls per hr. 10:30 - 12:00 1.50 DRILL P PROD1 Short trip f/9811' into window @ 9100' & return to TD. Pulser failure @ TD. Work on & repair pulsar. 12:00 - 16:30 4.50 DRILL P PROD1 Directional drill 3 3/4" hole f/9811' to 10,057'. Fluid loss remained constant @ +/- 20 Bbls per hr f/9811' to 10,035'. Drilling break with increasing rate of lost returns @ 10,035'. Experience complete lost returns @ 10,057'. 16:30 - 18:00 1.50 DRILL P PROD1 Short trip f/10,057' into window @ 9100'. 18:00 - 20:00 2.00. DRILL N DPRB PROD1 Wait on mud. 20:00 - 21:00 1.00 DRILL N DPRB PROD1 Mix & pump high vis pill (15 Bbl) & spot same above window. POH to 8300'. 121:00-22:00 1.00 DRILL N DPRB PROD1 : Circulate across top of hole with loss rate of l/4 Bbl / min. Circulate down tubing with no returns. 22:00 - 00:00 2.00 DRILL N DPRB PROD1 Continue to circulate across top of hole while waiting on mud & mud products. 8/23/2001 00:00 - 01:30 1.50 DRILL N DPRB PROD1 Con't - Wait on mud & mud products while circulating across top of hole. Printed: 9/4/2001 5:05:48 PM BP EXPLORATION Page 3 of 5 Operations Summary Report Legal Well Name: Y-30 Common Well Name: Y-30L1 Spud Date: 2/17/1991 , Event Name: REENTER+COMPLETE Start: 8/17/2001 End: 8/29/2001 ,Contractor Name: NABORS TRANSOCEAN Rig Release: 8/29/2001 :Rig Name: CDR-1 Rig Number: Date From o To Hours Activity Code NPT Phase Description of Operations 8/23/2001 01:30 - 03:00 1.50 DRILL N DPRB PROD1 RIH & orient MWD tools. 03:00 - 04:00 1.00 DRILL P PROD1 Directional drill 3 3/4" hole f/10,057' to 10,100 while pumping LCM pill (32 Bbls). Partial returns of 10 - 15% was observed when the pill reached the lost circulation interval. Note - Lost circulation fault = 10,035' to 10,092'. 04:00 - 05:00 1.00 DRILL N DPRB PROD1 POH to 10,000' & clean pump screens. PJSM. Drop 3~4" ball & open circulating sub. Pump 'heavy' LCM pill. 05:00 - 07:00 2.00 DRILL N DPRB PROD1 Con't POH to 9100' & monitor well & circulate across top of hole. Note - Unable to circulate well by pumping down tubing without complete losses. 07:00 - 11:00 4.00 DRILL N DPRB PROD1 POH, down load & L/D USMPR tool. 11:00 - 13:00 2.00 DRILL N DPRB PROD1 P/U BHA#4 & RIH to 500'. Shallow test MWD tools -OK. 13:00 - 16:30 3.50 DRILL N DPRB PROD1 Con't RIH to TD @ 10,100'. 16:30 - 20:00 3.50 DRILL N DPRB PROD1 Unable to orient directional tools. Pump high vis pill & recieve very weak signal. POH testing tools @ 9130' & 8800'. 20:00 - 22:00 2.00 DRILL N DPRB PROD1 Con't POH & L/D BHA # 4. 22:00 - 23:00 1.00 DRILL N DPRB PROD1 PJSM. P/U BHA # 5 & RIH to 500'. Shallow test BHA - OK. 23:00 - 00:00 1.00 DRILL N DPRB PROD1 Con't RIH w/BHA # 5. Test BHA @ 5,000' - OK. 8/24/2001 00:00 - 05:00 5.00 DRILL N DPRB PROD1 Cont RIH with BHA #6. Test at 500' & 5000' - OK. RIH to flag and correct depth (+13'). Cont RIH to bottom at 10099'. Get clicks. 05:00 - 06:00 1.00 DRILL P PROD1 Drill ahead f/10,100' to 10200' with no returns. Lost MWD signal after pumping biozan sweep. Suspect sweep picked up some LCM left in suction lines or mixing pit. 06:00 - 09:30 3.50 DRILL N DFAL PROD1 Short trip into window @ 9100' while working on MWD tool. MWD pulse intermitten. RIH & stack out @ 9683' & lost MWD pulse. 09:30 - 11:30 2.00 DRILL N DFAL PROD1 POOH & L/D BHA # 6 (MVVD orienter). Monitor well, flush system, & clean pump screens. 11:30 - 15:30 4.00 DRILL N DFAL 'PROD1 PJSM. P/U BHA # 7 (New MWD Weatherford orienter). RIH, shallow test MWD @ 500' - OK. Con't RIH to flag (w/-4' corr). Run TIL @ 8935' (w/-6' corr). 15:30 - 19:30 4.00 DRILL N DF^L PROD1 Con't RIH & set down @ 10180'. Orient MWD. 19:30 - 22:00 2.50 DRILL N DFAL . PROD1 Orienter failed to click around. POH checking orienter function @ 10,050, 9950, & 8900'. No luck with orienter. 22:00 - 22:30 0.50 DRILL N DFAL PROD1 L/D BHA # 7 w/Weatherford orienter. P/U BHA # 8 w/Sperry Sun orienter & RIH to 100'. 22:30 - 23:30 1.00 DRILL N RREP PROD1 Repair mechanical depth counter. 23:30 - 00:00 0.50 DRILL N DFAL PROD1 RIH to 500' & shallow test MWD. Sperry orienter had weak signal. Service coil tubing injector unit. 8/25/2001 00:00 - 00:30 0.50 DRILL P PROD1 Con't service coil tubing injector unit. 00:30 - 01:30 1.00 DRILL N DFAL PROD1 POH & change out Sperry orienter (this was following shallow test failure on 8/24/2001). 01:30 - 04:30 3.00 DRILL N DFAL PROD1 P/U BHA # 8 & RIH. Shallow test @ 500' - OK. Con't RIH & run TIL @ 8935'. MWD failed during TIL (MWD failed to transmit tool face & inclination). 04:30 - 07:00 2.50 DRILL N DFAL PROD1 POH & L/D BHA # 8. 07:00 - 14:30 7.50 DRILL N DFAL PROD1 P/U BHA # 9. RIH & shallow test @ 500' - OK. Con't RIH & run Printed: 9/4/2001 5:05:48 PM BP EXPLORATION Page 4 of 5 Operations Summary Report Legal Well Name: Y-30 Common Well Name: Y-30L1 Spud Date: 2/17/1991 Event Name: REENTER+COMPLETE Start: 8/17/2001 End: 8/29/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/29/2001 Rig Name: CDR-1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/25/2001 07:00 - 14:30 7.50 DRILL N DFAL PROD1 TIL @ 8935' - OK. 14:30 - 18:00 3.50 DRILL N DFAL PROD1 Con't RIH. Set down @ 9598'. Sperry orienter failed to click around. Numerous attempts made to orient by moving tool up & down in casing & open hole with no success. 18:00 - 20:30 2.50 DRILL N DFAL PROD1 POH & L/D BHA # 9. 20:30 - 00:00 3.50 DRILL N DFAL PROD1 P/U BHA # 10 (with new Weatherford orienter). RIH & shallow test @ 500'. Con't RIH & run TIL @ 8935'. MWD tools have weak signal. Computer is suspected of malfunction rather than actual down hole tools. Continuing work on computer 'glitch'. 8/26/2001 00:00 - 01:00 1.00 DRILL N DFAL PROD1 Con't - Repair to Baker - Hughs MWD computer system. 01:00 - 06:00 5.00 DRILL N DPRB PROD1 RIH from top of window @ 9100'. Work thru tight spots from 9560' to TD @ 10200'. This trip required 4 trips thru the open hole section. 06:00 - 08:30 2.50 DRILL P PROD1 Directional drill 3 3~4" hole from 10,200' to 10,258' w/no returns. 08:30 - 09:00 0.50 DRILL P PROD1 Wiper trip to 9400'. 09:00 - 12:00 3.00 DRILL P PROD1 RIH & work tight spots f/9600' to10,100'. Tag TD & orient directional tools. 12:00 - 14:30 2.50 DRILL P PROD1 Directional drill 3 3/4" hole from 10,258' to 10,343' with no returns. 14:30 - 15:00 0.50 DRILL P PROD1 POH to 10,034'. Work pipe free & con't POH to 10,008'. 15:00 - 18:30 3.50 DRILL N DPRB PROD1 Work pipe @ 10,008' & wait on delivery of crude oil. 18:30 - 21:00 2.50 DRILL N DPRB PROD1 Pump 30 Bbl crude down coil tubing & displace with KCL water. Work pipe free & POH to 9075' (above window). 21:00 - 00:00 3.00: DRILL N DPRB PROD1 RIH & work directional drill ass'y thru tight spots, 9585' to TD @ 10343'. This required 3 trips. Working tight hole @ midnight. 8/27/2001 00:00 - 01:00 1.00 DRILL P PROD1 RIH to TD @ 10,343', orient tools & directional drill 3 3/4" hole f/10,343' to 10,351' w/no returns. 01:00-03:30 2.50 DRILL 'N DPRB PROD1 POHforTIL. Stuckpipe@ 10,100'. Work pipe free & POH to 10,028'. Pump crude down coil tbg & free tbg. 03:30 - 06:00 2.50 DRILL N DPRB PROD1 POH to 8935' & run TIL. (+ 24' correction). 06:00 - 07:30 1.50 DRILL P PROD1 POH for BHA inspection & BOP test. Rack back injector & L/D BHA # 10. 07:30 - 08:00 0.50 DRILL P PROD1 Rig up lubricator & set TWC. PJD lubricator. 08:00 - 15:00 7.00 DRILL P PROD1 ~Test BOPE, et al, to 250/3500 psi as per BP requirements. Note - AOGCC Represenative, Mr. Chuck Shieve, waived witnessing the pressure test. 15:00 - 16:00 1.00 DRILL P PROD1 Rig up lubricator & recover TWC. R/D lubricator. : 16:00 - 19:30 3.50 DRILL 3 PROD1 P/U BHA # 11 & RIH to 8810'. Flag coil tbg @ 7500', 8500', 8700', 8800'. 19:30 -22:30 3.00 DRILL 3 PROD1 POH & L/D BHA # 11. 22:30 - 00:00 1.50 DRILL 3 ~PROD1 PJSM. R/U tools & equipment for handling 2 3/8" X 2 7/8" liner. P/U & run 2 3/8" X 2 7~8" liner as per program. 8/28/2001 00:00 - 07:00 7.00 CASE 3 COMP Con't - RIH w/2 3/8" X 2 7/8" liner, as per program. Set down @ 9602'. 07:00 - 08:00 1.00 CASE 3 COMP Mix & pump 35 Bbl 'slick' pill. 08:00 - 10:30 2.50 CASE N DPRB COMP PJSM. Work pipe. No success in working thru bridge @ 9602'. 10:30 - 16:30 6.00 CASE N DPRB COMP POH, rack back coil tbg injector, & L/D 2 3/8" X 2 7/8" ~roduction liner. 16:30 - 21:00 4.50 CASE 3 COMP PJSM. Rig up tools & equipment for running 2 3/8" X 2 7/8" ~roduction liner. P/U & M/U 'revised' 2 3/8" X 2 7/8" production Printed: 9/4/2001 5:05:48 PM BP EXPLORATION Page 5 of 5 Operations Summa Report Legal Well Name: Y-30 Common Well Name: Y-30L1 Spud Date: 2/17/1991 Event Name: REENTER+COMPLETE Start: 8/17/2001 End: 8/29/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/29/2001 Rig Name: CDR-1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/28/2001 16:30 - 21:00 4.50 CASE P COMP liner. 21:00 - 23:30 2.50 CASE P COMP Run 2 3/8" X 2 7/8" liner in hole on coil tbg. Production liner - 8794' to 9600'. 23:30 - 00:00 0.50 CASE P COMP PJSM. Drop 5~8" ball & displace with KCL water. 8/29/2001 00:00 - 00:30 0.50 CASE P COMP 40K up wt, 30K dn. Continue circulating ball down, on seat @ 148.3 bbls away. Sheared @ 1700 psi. 37K up wt. 00:30 - 03:00 2.50 CASE P COMP 'POOH, rack back injector. 03:00 - 04:00 1.00 CASE P COMP L/D 25 jts 1" CS Hydril tbg. 04:00 - 05:00 1.00 CASE P COMP M/U nozzle & RIH to 2000'. 05:00 - 06:00 1.00 CASE P COMP Circulate 60~40 meth around to freeze protect & POOH. 06:00 - 08:30 2.50 CASE P COMP R/U lubricator & set BPV, RID lubricator. 08:30 - 10:00 1.50 CASE P COMP Clean pits & blow down lines. 10:00 - 12:00 2.00 CASE P COMP N/D BOPE & install tree cap. Well secure. Rig released @ 12:00 hrs, 08/29/01. 12:00 - 00:00 12.00 CASE P COMP Layover catwalk, coil tower & scissor trailer. Scope derrick down & lay over. Blow down steam lines & secure pumps f/ move. Rig down & spot sub over Y-02. Printed: 9/4/2001 5:05:4~3 PM Obp BP Amoco Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad Well: Y-30 Wellpath: Y-3OL1 Date: 9112/2001 Time: 14:42:28 Page: I Co-ordinate(NE) Reference: Well: Y-30, True North Vertltal (TV'D) Reference: 42: 30 2/8/1991 00:00 87.3 Section (rS) Reference: Well (0.00N,0.00E,225.88Azi) Survey Calenlatlon Metlmd: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Ga) Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Alaska, Zone 4 Coordinate System: Well Centre Geomagnetic Model: BGGM2001 Site: PB Y Pad TR-11-13 UNITED STATES: North Slope Site Position: Northlng: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5948541.48 ft 647748.73 ft Latitude: 70 16 0.041 N Longitude: 148 48 18.991 W North Reference: True Grid Convergence: 1.12 deg Well: Y-30 Y-30 Well Position: +N/-S 414.25 ft Northing: 5948899.04 ft +E/-W-2883.07 ff Eastlug: 644858.30 ff Position Uncertainty: 0.00 ff Slot Name: 30 Latitude: 70 16 4.110 N Longitude: 148 49 42.910 W Wellpath: Y-30L1 Drilled From: Y-30 500292213560 Tie-on Depth: 9105.00 ft Current Datum: 42: 30 2/8/1991 00:00 Height 87.27 ff Above System Datum: Mean Sea Level Magnetic Data: 8/14/2001 Declination: 26.52 deg Field Strength: 57487 nT Mag Dip Angle: 80.76 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ff ff ff deg 0.00 0.00 0.00 225.88 Survey: MWD Start Date: 8127/2001 Company: Baker Hughes INTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Annotation , 9105.00 8901.37 KOP 10351.00 9015.65 TD Survey ' Inci" ' Azlm ' TV'D" SSTVD N~s I I I E~ L I l~ deg' ' deg :" fl','," , fi'' ' fi':' '~ , 9105.00 17.45 312.56 8901.37 8814.10 239.10 -1115.60 9155.00 32.20 296.20 8946.68 8859,41 250.13 -1133.19 9190.00 40.10 275.40 8975.02 8887.75 255.33 -1152.88 9227.00 46.90 265,60 9001.88 8914.61 255,42 -1178.27 9264.00 57.10 261.70 9024.63 8937.36 252.13 -1207.19 5949116.61 5949127.29 5949132.12 5949131,71 5949127.87 643738.40 643720.60 643700.81 643675.43 643646.57 deg/100ft ft , 0.00 634.41 32.29 639.37 41.43 649.88 25.85 668.05 28.78 691.10 9306.00 70.00 261.70 9043.30 8956.03 246.71 -1244.32 9331.00 77.40 261.00 9050.31 8963.04 243.10 -1268.03 9367.00 79.90 257.50 9057.40 8970.13 236.52 -1302.70 9398.00 81.80 254.00 9062.33 8975.06 228.98 -1332.35 9450.00 64,60 248.70 9068.49 8981.22 212,47 - 1381.25 5949121.74 5949117.68 5949110.42 5949102.32 5949064.87 643609.56 30.71 721.53 643585.93 29.72 741.06 643551.40 11.79 770.53 643521.89 12.72 797.07 643473.32 11,46 643.66 9504.00 84.70 241.00 9073.53 8986.26 189.64 -1429.88 9567.00 64,60 231.10 9079.42 8992.15 154.65 -1481.85 9619.00 87,80 223.80 9082.87 8995.60 119.59 -1520.04 9675.00 94.00 219.90 9081.99 8994.72 77.91 -1557,37 9709.00 96.00 214.60 9079.03 8991.76 50,96 -1577.87 5949061.11 5949025.14 5948989.35 5948946.96 5948919.62 643425.15 14.20 894.47 643373.87 15.65 956.13 643336.36 15.30 1007.95 643299.64 13,08 1063.77 643279.87 16.60 1097.25 9751.00 97.60 210.40 9074.05 8986.78 15.80 -1600.27 9796.00 96.60 202.70 9068.48 8981.21 -24.12 -1620.21 9836.00 95.20 197.00 9064.37 8977.10 -61,52 -1633,71 5948884.04 5948843.75 5948806.09 643256.15 10.63 1137.81 643238.98 17.12 1179.91 643226.20 14.60 1215.65 BP Amoco Baker Hughes INTEQ Survey Report ~'r~.o Compaay: BP Amoco Bate: 9/12/2001 Time: 14:42'98 Page: 2 FieM: Prudhoe Bay Co-ordlaate(NE) Reference: Well: Y-30, True North Site: PB Y Pad Vertical (TVI)) Refereace: 42: 30 2/8/1991 00:00 87.3 Well: Y-30 Section (V$) Refereace: Well (0.00N,0.00E,225.88Azi) Weapath: Y-30L1 Survey CaEulaflon Method: Minimum Curvature Db: Oracle Survey MD I1¢! Azhn TVD SSTVD NIS E/W MapN MapE DLS VS ff deg deg ff ff ff ff ff ff deg/100ft ff 9879.00 94.10 192.50 9060.88 8973.61 -102.96 -1644.62 5948764.46 643216.09 10.74 1252.32 9918.00 96.90 195.30 9057.14 8969.87 -140.64 -1653.94 5948726.61 643207.50 10.13 1285.24 9954.00 97.80 199.50 9052.53 8965.26 -174.70 -1664.62 5948692.35 643197.48 11.84 1316.62 9990.00 96.90 204.10 9047,92 8960.65 -207.84 -1677.87 5948658.97 643184.87 12.92 1349.21 10041.00 94.90 200.20 9042.68 8955.41 -254.81 -1696.99 5948611.63 643166.66 8.56 1395.63 10085.00 96.80 192.80 9038.19 8950,92 -296.75 -1709,42 5948569.47 643155.04 17.28 1433.75 10135.00 99.30 196.30 9031.19 8943.92 -344,66 -1721.85 5948521.34 643143.54 8.55 1476.03 10176.00 97.00 199.10 9025.37 8938.10 -383.32 -1734.19 5946482.45 643131.94 8.78 1511.80 10209,00 94.30 200.50 9022.12 8934.85 -414.21 -1745.31 5948451.35 643121.42 9.21 1541.29 10241,00 91.50 204.40 9020.51 8933.24 -443.74 -1757.51 5948421.60 643109.79 14.99 1570.60 10299,00 92.90 207.90 9018.28 8931,01 -495.75 -1783.05 5948369.10 643085.26 6.50 1625.15 10351.00 92.90 207.90 9015.65 8928.38 -541.65 -1807.35 5948322.75 643061.85 0.00 1674.55 Amoco REFERENCE JN FORMATION Co ordinate (N/E Reference [¥VD)) Reference WeJl Cenlre: Y 30, True Ncnb Sys[em: Mean Sea Level Sec[~n (VS) Reference Slot 30 (000N,0 00E) Measured Depll~ Reference: 42: 30 2/0/1091 00:00 0727 Calcula(ion Method: Minimum Curvature 8400 400 300 ~o -2800 270O 26O0 25OO 240O 23OO 22OO 2100 2000-1900 1800 1700 1600 1500 1400 1300 1200-1100-1000 -900 -800 -700 -600 ~500 400 4300 -200 West(-)lEast(*) [t OOft/in] I~ 8950 40O 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000 2050 2100 2150 2200 2250 2300 2350 9112/2001 2;41 PM ALASKA OIL AND GAS CONSERVATION COM~q~SSION Thomas McCarty CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re; Prudhoe Bay Unit Y-30L1 BP Exploration (Alaska) Inc. Permit No: 201-166 Sur Loc: 1357' SNL, 43' EWL, SEC. 34, T11N, R13E, UM Btmhole Loc.2057' SNL, 1999' WEL, SEC 33, T1 iN, R13E, UM TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dear Mr. McCarty: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 036. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Julie M. Heusser Commissioner BY ORDER OF TH~._~MMISSION DATED this day of August, 2001 .jjc/Enclosures cc' Department offish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 [] Drill [] Reddll 1 lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE -- 87.27' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028287 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1357' SNL, 43' EWL, SEC. 34, T11 N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 1098' SNL, 1093' WEL, SEC. 33, T11 N, R13E, UM Y-30L1 Number 2S100302630-277 At total depth 9. Approximate spud date 2057' SNL, 1999' WEL, SEC. 33, T11N, R13E, UM 08/17/01 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 047471, 3222' MDI No Close Approach 2560 10746' MD / 8914' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 9110' MD Maximum Hole Angle 95 o Maximum surface 2569 psig, At total depth (TVD) 8800' / 3625 psig 18. Casing Program Specifications Setting Depth ~i;~ TOD Bottom Quantitv of Cement Hole Casinq Weiqht Grade C0uplinq Lenqth MD TVD MD TVD (include staqe data) 3-3/4" 3-1/2. x2-7/s.9.3/6.5# L-80 ST-L 1956' 8790' 8514' 10746' 8914' Uncemented Slotted Liner .J~ ~ ,,,, ,, , , , , , , , , , ............... /1~ ~,-, ..... 19. To De Completed for Redriil, Re-entry, and Deepen Operations. "~E7 U Present well condition summary Alaska · .. Total depth: measured 9540 feet Plugs (measured) Failed IBP at 9426' (02/92) Oil&.Gas true vertical 9319 feet Anchorag;' Effective depth: measured 9426 feet Junk (measured) true vertical 9209 feet Casing Length Size Cemented M D TVD Structural Conductor 110' 20" 110' 110' Surface 2706' 10-3/4" 2304 cuft CS III, 1056 cuft CS II 2706' 2706' Intermediate 9064' 7-5/8" 1268 cuft Class 'G' 9064' 8862' Production Liner 725' 5-1/2" 152 cuft Class 'G' 8815'- 9540' 8625'- 9319' Perforation depth: measured 9097' - 9117', 9202' - 9274', 9284' - 9294' true vertical 8894' - 8913', 8994' - 9063', 9073' - 9082' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling P~ogram [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements "Contact Engineer Name/Number: 'Thomas MoOarty, 564-5697 ' ' Prepared By Name/Number:' Terrie Nubble, 5~4"4628" 21. I hereby certify'that the foregoing is true and correct to the best of my knowledg"e ........... s~ ned Thomas McCa ,,,,,, ~ .g. ~ ? ~/~~ Title CT Ddll,ng Engineer Date 0~~ i?!'T'! '?'i ',.':'i'!'i'" :::'i'! ?"'""?"?.' ;':."?"'i"'"?:'."?:'!"i?":]"i :~ ,~::,,:~ ii'~:?~. ;,.:,.,:. ~..:".!' :~'~ii"~i~i" ~ :Bhl¥ '.?,'.~:, :. ;'."i,.' ',:..,? :,: :~' :',:,:,.':::,, :,:, "i.::~... ?~.:'"" ':: :,.~:.' ~" .':::,' i.:,..~','~ ": :'? ,.' "'l~ermit ~umber ' ' ' ..... "1 APi' ~i"~m~er''''''''''''' ""'" .......... "~ ....... ~ ..... '""'~'"' ........ ' .......... "'i ...... '""'""~pr0~t~'Dat;"':'": ......... "l:'~e;'~O~;r'"l;ii*~ ...... '" I t Conditions of Approval: Samples Required [] Yes .~No Mud Log ~eq[{i~ed [] Yes 1~i No" ' Hydrogen Sulfide Measures [] Yes ~o Directional Survey Required j~ yes '~F1 NO Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] lek [] 15K 'l~.SK psi for CTU Other: /- ORIGINAL SIGNED BY by order of Approved By , ,~ ,~,~,,,,,,, Commissioner the commission Date ~/<:~/~,.t Form 10-401 Rev. 12-01-85 ORIGINAL plicate BPX Y-30 L1 Sidetrack Summary of Operations: A CTD sidetrack of well Y-30 will be drilled. Specific prep work, (Phase 1) and drilling, (Phase 2) operations are detailed below. Phase 1: Isolate & integrity test inner annulus, (IA). Drift liner and set whipstock. Mill window if service coil is available. Planned for August 10, 2001 · Drift well with dummy whipstock to 9170' SLM. · Perform Integrity test IA after displacing to seawater & installing dummy gas lift valves. · Set through tubing whipstock using e-line at approx. 9120' (top of whipstock). · Mill window with service coil if available. Phase 2: Drill and Complete CTD sidetrack: Planned for August 17, 2001 2-3/8" coil will be used to drill a ~1600 foot, 3-3A'' open hole sidetrack, (as per attached plan) and run a slotted, uncemented 3-1/2" x 2-7/8" liner completion. Mud Program: · Phase 1: Seawater . Phase 2: Seawater and FIo-Pro (8.6 - 8.7 ppg) Disposal: · No annular injection on this well. · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 3-1/2", L-80, solid liner will be run from 8790'md (TOL, 8514' TVDss) to approx. 9200'md and then crossed over to 2- 7/8",L-80, slotted liner to TD at approx 10,746' md. ~ Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2500 psi. Directional · See attached directional plan · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · An MWD Gamma Ray + Resistivity log will be run over the open hole section. · Memory CNL will be run in the cased hole after reaching TD. Hazards H2S was measured at 20 ppm on January 7, 2001. The well-path will cross 0 mapped faults, however there are two sub-seismic features the well plan will cross that may represent small fractures (<10'). The geologic risk is Iow, but it does exist. The NW-SE orientation of the sub-seismic features is parallel to the regional maximum stress; therefore, although these features are small, they may be gapped open and at least partially conductive. Reservoir Pressure Res. press, is estimated to be 3625 psi at 8800ss. is 2569 psi. Max. surface pressure with gas (0.12 psi/ft) to surface TREE= 4" CIW SAFETY NOTES: CHROMETBG & LNR. WB..LHEAD= FMCY 30FAILED BKR BP @ 9426'. ~A CTUATOR= OTIS KB. ELEV = 87.2~ BF. ELEV = 50.76' I' 2076' Id4-1/2"OTISSSSVLANDINGNIP, ID=3.813"[ KOP = 5800' Max An le = 23 7100' Datum MD = 9090'1 DatumTVD = 8800' SS GAS LIFT MANDRELS ST MD TVD DEr' TYPE VLV LATCH PORT DATE 10-3/4" CSG, 45.5#, NT-80 BTRS, ID = 9.953" H 2706' I~ 6 3002 2915 0 KBMG BK-2 03/18/01 5 5066 4979 1 KBMG DV BK-2 03/18/01 b 4 6502 6375 22 KBMG DV BK-2 03/18/01 3 7276 7088 22 KBMG DV BK-2 03/18/01 Minimum ID = 3.725" @ 8799' 2 8282 8033 19 KBMG DC BK-2 03/18/01 I 8693 8421 19 KBMG DC BK-2 03/18/01 SWN NIPPLE I 8724' Id 7-5/8" X 4-1/2" TIW HBBP PKI~ ID = 4.0" i I ~ I 8799' /2" PKR SWN = .0152bpf, ID= 3.958" [ 8817' H'nWDMY SE.A, LASSYW/OSEALS I ITOPOFTIw5'I/2''LNRHGRTIBACKSLvI--I8814' I 17-5/8" X 5-1/2" TIW LNR HGR W/TIBAOK Id 8818'I 17-5/8.'LN~29.7#,NT95Hs- 1-19064' '1 .' NSCC, .0459 bpf, ID = 6.875" PERFORATION SUMMARY REF LOG: WA-BHCA, 02/22/91, SWS-CET 03/30/91 ANGLEAT TOP PERF: Note: Refer to ProduclJon DB for historical perf da~a SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 9097 -9117 O 11/~7/91 3-3/8" 6 9202 - 9274 O 04/09/91 3-3/8" 6 9284 - 9294 O 04/09/91 i 5-1,2"LNR, 17#, 13-CRFL4S, .0232 bpf, lD =4.892" I--I 9540' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOEBAY UNIT 02/27/91 RPD ORIGINAL COMPLETION WELL: Y-30 01/07/01 SlS-SLT CONVERTEDTOCANVAS PERMIT No: 91-015 01/15/01 SIS-MD INITIAL REDRAW I APl No: 50-029-22135-00 07/14/01 CH/KAK CORRECTIONS ; I 1357' FNL & 43' FWL, Sec. 34, Tll N, RG13E i ! ; BP Exp Ioratio n (Alas ka) I SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 9097 -9117 O 11/97/91 3-3/8" 6 9202 - 9274 O 04/09/91 3-3/8" 6 9284 - 9294 O 04/09/91 DATE REV BY COMMENTS DATE REV BY COMMENTS 02/27/91 RPD ORIGINAL COMPLETION 01/07/01 SlS-SLT CONVERTEDTOCANVAS 01/15/01 SIS-MD INITIAL REDRAW 07/14/01 CH/KAK CORRECTIONS TREE = 4" CIW .V~EL~.~.D,=. ~.MC ACTUATOR= OTIS '~K'B'i' '~"~"; §~;'i~~ 'BFi ELD'= 50.76' '~'~("'A n'gb";= ......... j~3'"~-"~';i'(j~j~' Datum MD = 9090' i' Y-30L1 !"'- ISafety Notes: Chrome TBG & LNRI ,o. I 2076' [d4-1/2" OTIS SSSV LANDING NIP, ID = 3.813" GAS LIFT MANDRELS 10-3/4" CSG, 45.5#, NT-80 B'IRS, ID = 9.953" Id 2706' IMinimum ID = 3.725" @ 8799' SWN NIPPLE 8719' Id4-1/2" PKR SWS NIP, ID= 3.813"I ITop of Proposed Liner 4-1/2"TBG, 12.6#, 13-CR-TDS, Id I .0152 bpf, ID = 3.958" ITOP OF TIW 5-1/2" LNR HGR TIEBACK SLV 7-5/8" X 5-1/2" TIW LNR HGR W/TIBACK 8810' I-- 8724' H7-5/8,,x 4-1/2"TIVVHBBPPKR, ID=4.0" ] 8778' 8799' Id4-1/2" PKR SWS NIP, ID= 3.813"I Id4-1/2" PKR SWN NIP, ID= 3.725"I 8817' ]dTIW DMY SEAL ASSY W/O SEALS 8807' HELMD'SWN NIP I 7-5/8" LNR, 29.7#, NT95 HS- ]-'1 9064' NSCC, .0459 bpf, ID = 6.875" IMill Window off Flow-by Whipstock Id 9120' PERFORATION SUMMARY REF LOG: WA-BHCA, 02/22/91, SWS-CET 03/30/91 ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 9097 - 9117 O 11/07/91 3-3/8" 6 9202 - 9274 O 04/09/91 3-3/8" 6 9284 - 9294 O 04/09/91 5-1/2" LNR, 17#, 13-CRFL4S, .0232 bpf, ID=4.892" Id 9540' J~ 3-1/2" X 2-7/8" XO I """' ,,..., ,,,... 1 3-1/2,,x 2-7/8, Slotted Liner, Uncemented Id o!oo'1 9'~'L~_~.~d FISH- BKR IBP- lost during attempted retrieval 2/12/92 DATE REV BY COMMENTS DATE REV BY COMMENTS 02/27/91 RPD ORIGINAL COMPLETION 01/07/01 SlS-SLT CONVERTED TO CANVAS 01/15/01 SIS-MD INITIAL REDRAW 07/14/01 CH/KAK CORRECTIONS 08/02/01 pcr Y-30L1 proposal PRUDHOE BAY UNrT WELL: Y-30L1 Proposed . PERMIT No: 191-015 APl No: 50-029-22135-60 1357' FNL &43' FWL, Sec. 34, T11N, RG13E BP Exploration (Alas ka) BAKER HUGHES INTEQ Company: Well: API No: Rig: Field: BP Exploration Alaska, Inc. Y-30A Case #122 50-029-22135-01 Nordic 1 Prudhoe Bay Unit i i i Proposal Calculations Coordinates provided in: TRUE relative to Wellhead and ALASKA STATE PLAN Vertical Sect. Plane: Mag. Declination: 26.800 Grid Correction: 1.120 Dip: 80.740 RKB Height: 87.27 225.880 TRUE Job No: AFE No: Drilled From: Start Date: End Date: Me~ j Depth 9083.541 Incl. Angle (deg) 17.17 9160.00 TRUE AzL (deg) 312.46 TvDJ Subsea fit) 8793.61' 9475.001 9500.00I I9525.00[ 9550.00[ 9575.00[ 9~25.0ol 9100.00 17.37 312.46 8809.33 9110.00 17.49 312.46 8818.87 9140.00: 19.29 312.46 8847.34 9150.00 21.93 307.55 8856.70 24.68 303.67 300.54 9170.00 27.52 9180.00 30.41 297.95 9190.00 33.34 295.78 9200.00 36.31 293.92 39.30 292.31 290.89 42.31 45.34 289.63 48.38 288.49 287.45 286.78 284.52 282.91 267.491 264.48 8865.88 8874.86 8883.61 8900.31 8915.78 8929.83 fit) ~ 8880.88[ 8896.60~ 8906.14[ 8934.61 ! 8943.971 Coords.- ASP N(+)/S(-) E(+)/W(-) Lab(Y) Dep.(X) 5949112.39 643743.19 5949115.62 643739.52 5949117.60 643737.28 5949123.85 643730.16 5949126.05 643727.42 5949128.29 643724.16 5949130.54 643720.39 5949132.82 643716.12 5949135.11 643711.36 5949137.41 643706.13 5949139.70 643700.45 5949141.99 643694.33 5949144.26 643687.79 Coords. TRUE N(+)/S(-) Lab (Y) 234.79 E(+)/W(-) Dep. (X) -1110.89 Dogleg Severity (°/lOOft) 0.00 Vertical Section 0.00 Tool Face 0.00 238.09 -1114.49 1.21 0.21 0.00 240.11 -1116.70 1.21 0.33 0.00 246.50 -1123.69 0.00 248.75 -1126.39 251.05 -1129.61 0.73 1.04 253.38 31.51 -35.53 -30.94 -1133.34 -27.37 -1137.56 -24.55 255.74 258.12 -1142.27 260.52 -1147.46 262.92 -1153.09 265.33 -1159.17 267.72 -1165.67 5949146.51 643680.85 270.10 -1172.56 5949148.72 643673.53 272.46 -1179.84 5949150.25 643668.20 274.09 -1185.14 5949150.90 643665.86 274.78 -1187.47 5949152.93 643657.84 276.97 -1195.44 5949154.80 643649.51 279.00 -1203.74 5949156.48 643640.88 280.84 -1212.34 643631.98 282.51 -1221.20 5949157.98 5949159.28 643622.85 283.99 -1230.31 5949160.39 643613.51 285.28 -1239.63 5949161.31 643603.98 5949162.02 643594.30 9063.88: 5949162.53 643584.50 286.38 287.28 -1249.14 -1258.80 -1268.60 31.75I 31.75! 31.85 12.00 12.00 287.98 9065.27 5949162.83 643574.60 288.47 -1278.48 8978.881 9066.15 5949162.93 643564.64 288.76 -1288.44 8979.09 9066.36 5949162.91 643560.64 288.82 -1292.44 8980.19 9067.46 5949161.98 643534.69 288.39 -1318.41 89.82i 108.45! 127.26 8981.26 9068.53 5949159.75 643509.82 -1343.32 286.64 -1441.04 -1464.65 -21.90I . . -90-67l -90.54 Build (*/lOOft)o O0 Turn (°/iOOft) 0'00! 0.00 0.00 0.0~ -49.07 -38.80 28.34 -31.36 28.92 -25.87 29.35 -21.74 29.67 -18.58 29.92 -16.12 30.12 -14.18 30.27 -12.63 30.40 -11.37 30.50 -10.34 30.56 -9.63 28.22 -17.98 28.38 -17.20 28.60 -16.13 28.79 -15.23 28.95 -14.46 29.08 -13.82 -13.29 -12.85 29.34 -12.49 29.40 -12.21 29.44 -12.00 29.47 -11.86 29.56 -0.13 -0.10 12.00 12.00 -11.89 -12.01 -12.01 261.48 8982.34 9069.61 5949156.23 643485.09 283.59 -1368.11 12.00 146.92 -90.41; -0.07 -12.01 87.501 258.48 8983.43 9070.70 5949151.41 643460.59 279.24 -1392.70 12.00 167.35 -90.28 -0.04 -12.01 87.501 255.48 8984.52 9071.79 5949145.32 643436.38 273.62 -1417.03 12.00 188.50 -90.15 -0.02 -12.01 87.501 643412.51 266.72 -90.02 0.01 -12.01 210.33 232.75 -89.89 303.05 9072.881 5949137.96 9073.971 5949129.37 9075.05[ 5949119.56 9076.131 5949108.56 9077.19~ 5949096.40 643389.07 252.47 249.47 87.51] 87.53[ 87.55[ 87.581 -89.50 246.47 258.58 8985.61 8986.70 8987.78 8988.86 8989.92 -12.01 12.00 12.00 12.00 243.47 240.46 643366.10 249.21 -1487.80 643.343.68 238.65 -1510.42 643321.87 226.91 -1532.47 255.73 -89.76 0.06 -12.01 279.18 -89.63 0.09 -12.01 0.12 -12.01 Comments Tie-in Position Kick off Point 1 i i i i i Mea~. Incl. TRUE TVD TVD Coords. - ASP Coords. - TRUE Dogleg Vertical Tool Face Build Turn Depth Angle Azi. Subsea RKB N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Severity Section Comments (de~) (de~) (ft) (ft) Lat. (Y) Dep. (X) Lat. (Y) Dep. (X) (°ll00ft) TIP ,, (°/100ft) (°/100ft) 9650.00 87.62 237.46. 8990.97 9078.24 5949083.11 643300.72 214.03 -1553.87 12.00 327.28 -89.37 0.15 -12.01 9659.00 87.63 236.38 899 i.34 9078.61 5949078.07 643293.29 209.13 - 1561.40 11.99 336.07 -89.26 0.16 - ! 2.00 3 9675.00 89.55 236.38 8991.73 9079.00 5949068.96 643280.14 200.27 -1574.72 12.00 351.74 0.00 12.00 0.00 97iX}.00 92.55 236.38 8991.28 9078.55 59490,54.72 643259.60 186.44 - 1595.53 12.00 376.23 0.00 12.00 0.00 9719.00 94.83 236.38 8990.05 9077.32 5949043.93 643244.02 175.94 - 1611.32 12.00 394.81 0.00 12.00 0.00 4 9725.00 94.85 235.66 8989.54 9076.81 5949040.49 643239.13 ! 72.60 - 1616.28 12.00 400.67 -88.73 0.26 - 12.04 9750,00 94.90 232.65 8987,42 9074.69 5949025.52 643219,22 158.01 -1636,47 12,00 425,26 -88.79 0.23 -12.04 9775.00 94.95 229.64 8985.27 9072.54 5949009.52 643200.14 142.39 - 1655.86 12.00 450.01 -89.05 0.17 - 12.04 9800.00 94.97 226.63 8983.11 9070.38 5948992.55 643181.92 125.77 - 1674.40 12.00 474.87 -89.31 0.12 - 12.04 9825.00 94.99 223.6 i 8980.94 9068.2 i 5948974.64 643164.61 108.19 - 1692.05 12.00 499.78 -89.57 0.06 - 12.05 9850.00 94.99 220.60 8978.76 9066.03 5948955.85 643148.28 89.72 -1708.75 12.00 524.65 -89.83 0.01 -12.05 9875.00 94.98 217.59 8976.59 9063.86 5948936.23 643132.95 70.39 - 1724.45 12.00 549.43 -90.09 -0.05 - 12.05 9900.00 94.96 214.58 8974.42 9061.69 5948915.83 643118.67 50.27 -1739.12 12.00 574.04 -90.35 -0.10 -12.04 9925.00 94.92 211.57 8972.27 9059.54 5948894.70 643105.48 29.40 - 1752.71 12.00 598.41 -90.61 -0.16 - 12.04 9950.00 94.87 208.56 8970.14 9057.41 5948872.91 643093.43 7.84 -1765.19 12.00 622.49 -90.87 -0.21 -12.04 9975.00 94.80 205.55 8968.03 9055.30 5948850.52 643082.53 -14.34 -1776.52 12.00 646.20 -91.13 -0.26 -12.04 9978.00 94.79 205.19 8967.79 9055.06 5948847.79 643081.30 - 17.04 - 1777.80 11.91 649.02 -91.48 -0.31 - 11.95 5 10000.00 94.84 202.54 8965.94 9053.21 5948827.58 643072.82 -37.09 -1786.67 12.00 669.49 -88.78 0.23 -12.04 10025.00 94.89 199.53 8963.82 9051.09 5948804.17 643064.32 -60.33 -1795.61 12.00 692.27 -89.00 0.18 -12.04 10050.00 94.92 196.52 8961.69 9048.96 5948780..34 643057.08 -84.02 - 1803.32 12.00 714.49 -89.26 0.13 - 12.04 10075.00 94,94 193,51 8959,54 9046.81 5948756.17 643051.09 - 108.07 - 1809.77 12,00 736,09 -89.52 0.07 - 12.04 10100.00 94.94 ! 90.50 8957.38 9044.65 5948731.72 643046.38 - 132.43 - 1814.95 12.00 757.00 -89.77 0.02 - 12.04 10125.00 94.93 187.49 8955.23 9042.50 5948707.05 643042.96 -157.03 -1818.84 12.00 777.18 -90.03 -0.03 -12.04 10150.00 94.91 184.48 8953.09 9040.36 5948682.24 643040.84 -181.80 -1821.43 12.00 796.56 -90.29 -0.09 -12.04 10175.00 94.88 181.46 8950.95 9038.22 5948657.35 643040.03 -206.67 - 1822.72 12.00 815. I0 -90.55 -0.14 - 12.04 1 0200.00 94.83 178.45 8948.84 9036.11 5948632.45 643040.53 -231.58 - 1822.71 12.00 832.73 -90. 81 -0.20 - 12.04 10227.00 94.76 175.21 8946.58 9033.85 5948605.62 643042.52 -258.44 -1821.23 11.98 850.73 -91.06 -0.25 -12.02 6 10250.00 94.69 177.99 8944.68 9031.95 5948582.77 643044.32 -281.32 -1819.87 12.03 865.98 91.32 -0.30 12.07 10275.00 94.601 181.00 8942.66 9029.93 5948557.87 643045.02 -306.23 -1819.65 12.03 883.48 91.55 -0.35 12.06 10300.00 94.50 184.02 8940.67 9027.94 5948532.96 643044.41 -331.13 - 1820.74 12.03 901.89 91.79 -0.40 12.06 10325.00 94.39 187.03 8938.74 9026.01 5948508.12 643042.49 -355.93 - 1823.14 12.03 921.16 92.03 -0.45 12.06 10350.00 94.26 190.04 8936.85 9024.12 5948483.40 643039.26 -380.58 -1826.84 12.03 941.24 92.27 -0.50 12.05 10375.00 94.13 193.06 8935.02 9022.29 5948458.89 643034.74 -405.01 - 1831.83 12.03 962.07 92.49 -0.55 12.05 10400.00 93.98 196.07 8933.25 9020.52 5948434.64 643028.93 -429.14 -1838.11 12.03 983.59 92.72 -0.59 12.05 10425.00 93.90: 199.08 8931.53 9018.80 5948410.73 643021.86 -452.91 - 1845.64 12.03 1005.75 91.41 -0.32 12.05 1 0450.00 93.81 202.10 8929.85 9017.12 5948387.22 643013.54 -476.26 - 1854.41 12.03 1028.49 91.62 -0.36 12.05 1 0475.00 93.71 205.11 8928.21 9015.48 5948364.17 643004.00 -499.12 - 1864.40 12.03 1051.73 91.82 -0.40 12.05 10500.00 93.60 208.12 8926.62 9013.89 5948341.66 642993.25 -521.42 -1875.57 12.03 1075.42 92.02 -0.44 12.05 10525.00 93.48 211.13 8925.07 9012.34 59483 ! 9.74 642981.34 -543.11 -1887.91 12.03 1099.49 92.21 -0.48 12.04 10550.00 93.35 214.14 8923.59 9010.86 5948298.48 642968.29 -564.12 -1901.37 12.03 1123.88 92.40 -0.52 12.04 10573.00 93.22 216.91 8922.26 9009.53 5948279.,54 642955.31 -582.81 -1914.71 12.03 1146.54 92.56 -0.55 12.04 10575.00 93.21 217.15 8922.15 9009.42 5948277.92 642954.14 -584.40 -1915.91 12.03 1148.51 91.55 -0.33 12.04 10600.00 93.13 220.16 8920.76 9008.03 5948258.13 642938.93 -603.89 -1931.50 12.03 1173.33 91.56 -0.35 12.04 10625.00 93.03 223.17 8919.42 9006.69 5948239.17 642922.69 -622.54 -1948.10 12.03 1198.25 91.73 -0.38 12.04 10650.00 92.93 226.18 8918.12 9005.39 5948221.09 642905.49 -640.29 - 1965.65 12.03 1223.21 91.89 -0.41 12.04 10675.00 92.82 229.19 8916.87 9004.14 5948203.93 642887.36 -657.10 -1984.11 12.03 1248.15 92.05 -0.45 12.04 10700.00 92.70 232.20 8915.67 9002.94 5948187.75 642868.34 -672.91 -2003.43 12.03 1272.99 92.20 -0.48 12.03 10725.00 92.57 235.21 8914.52 9001.79 5948172,58 642848.51 -687.70 -2023.56 12.03 1297.66 92.34 -0.51 12.03 10746.00 92.46 237.74 8913.60 9000.87 5948160.68 642831.25 -699.27 -2041.04 12.06 1318.20 ,92.46 -0.53 12.06 , 7- TD BP Amoco WELLPA TH DETA IL S Plan#lO2 Y.30A 500292213501 Parent Wellpath: Y-30 Tle on MD: 9083.54 Vertlc~ Sectlow Origin: User Defined (0.00,0.00) Vertical Sectiow Angle: 224.88' Rig: Nordic 1 Depth Reference: 42:302/W199100:00 87~7ft REFERENCE INFORMATION Co-ordinate (N/E} Reference: Well Centre: Y-30, Tree North Vedical ("I'VD) Reference: System: Mean Sea Level Section (VS) Reference: User Defined (-1110.89,234.79) Measured Depth Reference: 42: 30 2/8/1991 00:00 87.3 Calculation Method: Minimum Curvature TARGET DETA~S Name TVD +~V-$ *E/-W Shape Y-30A I1 ~g0.0O 141,88 Y~I3 ~14~ -7~.31 -~.12 P~I 86O0 Tie-in Position Kick off Point BPAmoco m~ mil BAKER HUGHES ¥.~0 ~ PIaM102 Y-30A T SMAzirmJlhs to True Noflh Magnedc Nonh: 26.80° Masnetlc Field Stren~h: 57467nT i Dip Angle: 80.74°i Date: 9/26/20~0 Model: BOOM2000, C~ated Ry: James (~lm~cr C,onlacl Informat~oc*. Direct. (907) 267-6613 E-mad: briI polm$~mle~ corn Baker Hughes INTEO: (907) 2'67-6600 1000-} .............................. _j ..... , j -3oA_?,oo__n ..................... I ................... / [] 4~'~. [ KiCk off Polntl -500 .... : I Plan#II02 Y-30A - - i - ..... .. ~.~ _. ............ - .......... .:: :. . ' ~ ' ~ ' ~ ' ' ' ' ' ' ~ I ' ~~ ' ~ ~ i::-i *::] i--:-~--' ;- i I' -3000 -2500 -2000 -1500 - 1000 -500 0 West(-)/East(+} [500ff/in] -1000 ~1 Y-30 (Y-~30) I ...... ~'---T - T- --T----! r ~-- --I I I I -200 0 200 ) I i i I I I I I I I I I i i T i Plan#102 Y-30A j 1200 1400 1600 400 600 800 1000 CDR1 Drilling Wellhead I~i ail 16, 19.30' 21.10' Rig Floor 5.59' ~0'~ 65' I ;haffer Dual Ga~te :, T.O.T. 5,000 psi W.P. R~n Type Dual Gate mOPE ~ CT Injector Head Otis Q.C. thread half Traveling plate 5-1/2" l ub ricator Jacking Frame Top Stationary Plate Annular BOP (Hydril),7-1/16" ID Annular BOP (Hydril),7-1/16" ID Top blind/shearI 2-7/8" - 3.5" Variable bore rams Kill Line ~- I Top 2 3/8" pipe / slips I Btm 2 7/8" pipe / slips Manual Master Valve -- Tubing Hanger 9-5/8" Annulus 0.66' , IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Rig Matt Ground Level 13-3/8" Annulus ~I'RANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER CHECK 1 CHECK WHAT APPLIES STANDARD LETTER ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-69) DEVELOPMENT DEVELOPMENT REDRILL EXPLORATION INJECTION WELL INJECTION WELL REDRILL PILOT HOLE (PH) ANNULAR DIS)~AL ANNULAR DISPOSAL ( ) yES AI~INULAR DISPOSAL THIS WELL DISPOSAL INTO OTHER ANNULUS ( ) yES+ SPACING EXCEPTION "CLUE" The permit is for a new wellbore segment of existing well · ~'f--) , Permit No, lei/. I..q APl No. ~-? - .7,~ '! ~ ~ Production should continue to be reported as a function of the original AP1 number stated above. In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PI-I) and API number (50 -70/80) from records, data and logs acquired for wel! (name on permit)' Annular disposal has not been requested .... Annular Disposal. of drilling wastes will not be approved... Annular Disposal of drilling wastes will not be approved... Please note that an disposal of fluids generated... Enclosed is the approved application 'for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conserVation order approving a spacing exception. (Company Name) will assume the liability of any protest to the spacing exception that may occur. Templates are located m drive~jody\templates °'"" DATE I CHECK NO. I..1193,330 ' °7/°a/°' I · I00193330 ..... VENDOR DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET .... 070201 CKO702OiG 100. O0 ZOO. O0 PYMT (;OMMENTS: Pe~ it to D~ill ! ee HANDL NO INST: S/H - Teeeie Hub[ le X4628 o~ Sondea Steu~man X4750 1AO ~A I~A ~ BP EXPLORATION, (ALASKA)INC; P.O. BOX 196612 ANCHORAGE, ALASKA 99519-661'2 PAY ONE'i';'HuNDRED & OO/ FIRST NATIONAL BANK OF ASHLAND ' AN AFFILIATE OF NATIONAL CITY BANK CLEVELAND, OHIO 56-389 CONSOLIDATED COMMERCIAL ACCOUNT 00193330: To The ORDER 0¢ .iALAS½A CDNSERV~TI( SU I TE 10:O ANCHORAGE OAS OM~Iss:.ION 008 I, WELL PERMIT CHECKLIST FIELD & POOL _ _ ADMINISTRATION WELL NAME .,/,/.,.~ L l PROGRAM: exp COMPANY INIT CLASS ,~,.,.~..,,, ,/,....-~..,'/ GEOL AREA Y N Y'N dev. ,-~ redrll serv . ON/OFF SHORE Y N Y N 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available, in ddlling unit ............ 8. If deviated, is wellbore plat included ............. ... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ ,~'~",,--~ UNIT# wellbore seg..~_ ann. disposal para req ENGINEERING 12. Permit can.be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... 14. Conductor string provided ......... .......... 15. Surface casing protects all known USDWs... ........ 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg. ' 18. CMT will cover all known productive horizons. ' 19. Casing' designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate weilbore separation proposed ....... : ..... 23. If diverter required, does it meet regulations .......... 24. Drilling .fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to '~--(~c.~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ......... 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gaS probable ................. GEOLOGY ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ....... Y N APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity ,of the Well used for disposal; Y' N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N 30. Permit can be issued wlo hydrogen sulfide measures ...... ~YY N~~ 31. Data presented on potential overpressure zones ....... Y 32. Seismic analysis of shallow gas zones ........... . . Jz~ ~ 33. Seabed condition survey (if off-shore) ........... . . - ' ' 34. Contact name/phOne for weekly progress reports [exploratory on,~/J Y N . · GEOI.,DGY: ENGINEERING: ' UlClAnnular COMMISSION: JMh - - Comments/Instructions: Cl O Z O -I ITl c:~soffice\wordian~liana\checklist (rev. 11101//00) Well Histow File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXl , , No special'effort has been made to chronologically organize this category of information. **** REEL HEADER **** MWD 02/01/16 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 02/01/16 198186 01 3.125 USE, 1.75" NaviGamma - Gamma Ray *** LIS COM14ENT RECORD *** Remark File Version 1.000 Extract File: ldwg.las ~Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame ~Well Information Block ~MNEM.UNIT Data Type Information STRT.FT 9095.0000: Starting Depth STOP.FT 10351.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration, Inc. WELL. WELL: Y-30L1 FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 1357' SNL, 43' EWL CNTY. COUNTY: North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3.125' USE, 1.75" NaviGamma - Gamma Ray DATE. LOG DATE: 27-AUG-00 API. API NYUMBER: 500292213560 ~Parameter Information Block ~PINEM.UNIT Value Description SECT. 34 : Section TOWN.N TllN : Township RANG. R13EU : Range PDAT. MSL : Permanent Datum EPD .F 0 : Elevation Of Perm. Datum LMF . RKB : Log Measured from FAPD.F 87.27 : Feet Above Perm. Datum DMF . KB : Drilling Measured From EKB .F 87.27 : Elevation of Kelly Bushing EDF .F N/A : Elevation of Derrick Floor EGL .F N/A : Elevation of Ground Level CASE.F N/A : Casing Depth OS1 . DIRECTIONAL : Other Services Line 1 ~Remarks Ail depths are Measured Depths (MD) unless otherwise noted. Baker Hughes INTEQ runs 1 and 2 logged the hole section from 9097' MD (8807' SSTVD) to 10072' MD (8925' SSTVD) with Ultra Slim Multiple Propagation Resistivity tool (USPMR).Resistivity service was discontinued due to the possible lost in hole conditions which existed in runs 3-8. Continued logging to 10344' MD (8929' SSTVD) utilizing NaviGamma service. Well Y-30L1 was drilled to TD @ 10351' MD (8928' SSTVD) on Run 8.Bottom portion of the well was not logged due to Gamma Ray sensor offset. Well Y-30L1A was kicked off @ 9105' MD (8814' SSTVD) from the wellbore of Well Y-30. (5) Data presented here is final.The data has not been shifted to a PDC (Primary Depth Control) curve. As BPX instructions, the MWD Gamma Ray is the PDC for this borehole. (6) A Magnetic Declination correction of 26.52 degrees has been applied to the Directional Surveys. MNEMONICS: GRAX = Natural Gamma Ray [MWD], MWD-API GRAM = Natural Gamma Ray [RWD], MWD-API RPCHM = Resistivity Phase Difference, 2 MHz Comp, Borehole Corrected, [RWD] RPCLM = Resistivity Phase Difference, 400 Khz Comp, Borehole Corrected, [RWD] RACHM = Resistivity Attenuation, 2 Mhz Comp, Borehole Corrected, [RWD] RACLM = Resistivity Attenuation, 400 Khz Comp, Borehole Corrected, [RWD] SENSOR OFFSETS: RUN RESISTIVITY GAMMA DIRECTIONAL 1 27.64 ft 2 27.71 ft 3 N/A 4 N/A 5 N/A 6 N/A 7 N/A 8 N/A CURVE SHIFT DATA BASELINE, MEASURED, N/A, N/A, 20 88 ft 40 20 95 ft 40 28 40 ft 33 28 40 ft 33 28 40 ft 33 28 40 ft 33 26 64 ft 31 26 60 ft 31 DISPLACEMENT N/A 59 ft 66 ft 29 ft 29 ft 29 ft 29 ft 54 ft 50 ft Data has not been depth shifted to a PDC. Tape Subfile: 1 78 records... Minimum record length: Maximum record length: 8 bytes 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN mwd.xtf LCC 150 CN BP Exploration, Inc. WN Y-30L1 FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 1. The data presented is the field raw data. 2. The data has not been depth shifted to a PDC. 3. As per BPX instructions, Gamma Ray MWD/RWD is the PDC. *** INFORMATION TABLE: CIFO MNEM CHAN GRAX GRAX GRAM GRAM RALM RALM RPLM RPLM RAHM RAHM RPHM RPHM DIMT ....... CNAM ODEP ............................... GRAX 0 0 GRAM 0 0 RACLM 0 0 RPCLM 0 0 RACHM 0 0 RPCHM 0 0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Fra~ne Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GRAX MWD 68 1 API 2 GRAM RWD 68 1 API 3 RALM COMP 68 1 OHMM 4 RPLM COMP 68 1 OHMM 5 RAHM COMP 68 1 OHMM 6 RPHM COMP 68 1 OHMM Size 4 4 Total Data Records: 140 Tape File Start Depth = 9095.000000 Tape File End Depth = 10351.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 153 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** TAPE TRAILER **** MWD 02/01/16 198186 01 Length 4 4 4 4 4 4 4 4 4 4 24 **** REEL TRAILER **** MWD 02/01/16 BHI 01 Tape Subfile: 3 2 records... Minimum record length: Maximum record length: 132 bytes 132 bytes Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GRAX RAHM RPHM 9095.0000 -999.2500 0.1760 0.0880 9095.2500 -999.2500 0.2280 0.0950 9100.0000 -999.2500 4.5100 0.1670 9200.0000 -999.2500 45.9170 33.4070 9300.0000 -999.2500 6.0070 6.7280 9400.0000 -999.2500 9.5500 10.9380 9500.0000 -999.2500 7.0360 5.7770 9600.0000 -999.2500 10.2720 12.0030 9700.0000 -999.2500 4.4340 3.9870 9800.0000 -999.2500 5.7630 6.2430 9900.0000 -999.2500 3.7830 4.0020 10000.0000 -999.2500 5.1270 4.8470 10100.0000 22.7210 -999.2500 -999.2500 10200.0000 19.5640 -999.2500 -999.2500 10300.0000 24.5660 -999.2500 -999.2500 10351.0000 -999.2500 -999.2500 -999.2500 Tape File Start Depth = Tape File End Depth = Tape File Level Spacing = Tape File Depth Units = GRAM -999.2500 -999.2500 139.0090 113.2600 52.8110 26.3100 19.5360 46.5120 25.4140 21.9930 40.6360 19.0680 -999.2500 -999.2500 -999.2500 -999.2500 9095.000000 10351.000000 0.250000 feet RALM 0.4140 0.3690 1.5860 -999.2500 6.8300 10.0360 9.5030 11.8040 6.5550 6.7510 4.1430 6.0230 -999.2500 -999.2500 -999.2500 -999.2500 RPLM 0.0900 0 1120 0 0460 38 3170 6 2230 9 9850 6 4330 10.7890 4.4160 6.0110 3.8290 5.0840 -999.2500 -999.2500 -999.2500 -999.2500 Tape Subfile 3 is type: LIS