Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout192-008.~6CC IU :2Fb-fb42 JHN 1 ~ ' ~::) 10 ;::::)'~ INU ·UUO 1" ·U/ ALASKA OIL GAS CONSERVATION COMMISSION $001 Porcupino Drlvo Anchorage AK 99501-3192 Phone: 907-Z79-1433 Fax: 997 276-754Z To: Debra Childers Company: UNOCAL Phone: 263-7889 Fax: 263-7828 From: Lar~ J Grant cate: 01/18/95 Number of pages irloluding this Cover page: Comments: Debre, thanks for sending the well logs requested so quickly, We do however need yet to receive the following: . UNOCAL Comac~ date: 0tll 8195 Company Contact; DEBRA CHILDERS Phone Number: 263-7889 Comments; SEPIA FOR: L.,S.,g..T.(~,.R..LC..C._L._~_e~0_._*_t ~ ss~_ ........................... d RFCEIVED ~:F'B 0 -: 1995 STATE OF ALASKA ALASKA ! AND GAS CONSERVATION CC IISSlON REPORT (JF SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate , , Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1263' NSL, 181' EWL, Sec. 26, T11N, R15E, UM At top of productive interval 1293' SNL, 2214' WEL, Sec. 25, TllN, R15E, UM At effective depth At total depth 1244' SNL, 2134' WEL, Sec. 25, T11 N, R15E, UM 12. Present well condition summary Total depth: measured true vertical 13276 feet 9007 feet 5. Type of Well Development X Exploratory Stratigraphic ,, Service 6. Datum of elevation(DF or KB) 53 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-34A 9. Permit number/approval number 92-08 10. APl number 50 - 029-22160-01 11. Field/Pool Prudhoe Bay Oil Pool feet Plugs(measured) Fill @ 12925' MD (8/18/93) Effective depth: measured 12925 feet true vertical 8705 feet Casing Length Size Conductor 110' 20" Sudace 3901' 10-3/4" Production 10907' 7-5/8" Liner 2525' 5-1/2" Junk(measured) Cemented 8 CU yds Poleset 2522 cu ft 1608 cuft 230 sx Cl G Measured depth 110' 3954' 10960' RECE V[ o' True veHicaldepth 110' 3498' 7250' 8933' Perforation depth: measured 12914-12946' true vertical 8695-8723' 0CT - 5 1993 ,.~,laska 0il & Gas Cons. (;0mm~ss~0~ Anchorage Tubing (size, grade, and measured depth) 3-1/2", 9.3#, 13 CR-80, Tbg @ 10594' MD; 2-7/8", 6.4#, 13 CR-80, Tbg @ 12824' M D Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 12712' MD; Otis TRSV SSSV @ 2203' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Representative Daily Averaae Production Qr h~jection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 107 493 2450 -- Tubing Pressure 280 Subsequent to operation 221 525 2920 268 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. FSiogr nj~0_404~/88~---~ 1055/6 DTK cc: SW. JWP Title Engineering Supervisor Date SUBMIT IN DUPLICATE 4-34A DESCRIPTION OF WORK COMPLETED ROPE TREATMENT & FRACTURE TREATMENT OF ZONE I 8/7/93: MIRU & PT equipment. RIH & tagged PBTD at 12958' MD, then set a Shear Plug in the 2-7/8" tubing tail at 12787' MD. POOH. Rigged down. 8/8/93: MIRU & PT equipment to 7500 psi. Pumped 60 bbls of Seawater w/friction reducer on top of the Shear Plug & pressured up to perform a ROPE Treatment of the perforations located at: 12914 - 12946' MD (Z1) Ref. Log: BHCS 2/4/92. Shear Disk ruptured at 6750 psi. Rigged down. 8/14/93: RIH & pulled the ruptured Shear Disk from the wellbore. 8/16/93: MIRU & PT to 10100 psi. Pumped a Data Frac, followed by a Hydraulic Fracture Treatment using 16/20 mesh proppant, through the perforations (listed above). Pumped Breakdown of 200 bbls 20# Pre-Pad Gel @ 20 bpm, followed by Shutdown. ISIP: 875. Resumed pumping Data Frac of 72 bbls 40# Crosslinked Gel @ 20 bpm, followed by 35 bbls 40# Crosslinked Gel @ 5 bpm, followed by 148 bbls 40# Crosslinked Gel @ 20 bpm, followed by 102 bbls 20# Flush @ 20 bpm, followed by Shutdown. ISIP: 1980. Resumed pumping Fracture Treatment consisting of 100 bbls 40# Crosslinked Pad @ 15 - 20 bpm, followed by 410 bbls Slurry w/proppant stages @ 1 - 10 ppg, followed by 103 bbls 20# Gelled Flush, followed by Shutdown. Placed a total of 69,500 lbs of proppant in the formation. Rigged down. 8/17/93: Performed a CT proppant fill cleanout to 12960' MD. 8/18/93: RIH & tagged PBTD at 12925' MD. Placed well on production with gaslift & obtained a valid welltest. RECEIVED OCT - 5 199 Alaska 0il & Gas Cons. C0mm'~ss~o~ Anchorage · ' /'"'", STATE OF ALASKA f)V, i G I N A L - ALASKA _,,L AND GAS CONSERVATION CC,,,, MTSSION ~ WELL COMPLETION OR RECOMP L£TION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] ~ [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 92-08 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22160-01 4. Location of well at surface/ t'u~P"~L~T~j0j~~I 9. Unit or Lease Name 1263'NSL, 181' EWL, SEC. 26, T11N, R15E :".~ :/~T'tC.~"~ Prudhoe Bay Unit 10, Well Number At 1293 SNL, 2214 WEL, SEC. 25, T11N, R1 lED . 11. Field and Pool At Total Depth .... ~";~ Prudhoe Bay Fieid/Prudhoe Bay Pool 1244'SNL, 2134' WEL, SEC. 25, T11N, R15E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Sedal No. KBE = 53' I ADL 28324 12. Date Spudded 13. Da~e T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offsho re 116. No. o! Completions 1/16/92 2/3/92 2/8/92I N/A feet MSLI ONE 17. Total Depth (MD+TVD) 18. Plug Back Def~h (MD+TVD 19. Directional Survey J20. Depth where SSSV set ~21. Thickness of Permafrost / 13090'MD 8848 ' TVD 13005' MD/8775"i-VD YES [] N3 [] 2203'feet MD ! 1900' 22. Type Electric or Other Logs Run D IFL/B H C-A C/C N/G R 23. CASING, LINER AND CEMENTING RECORD SE'I-rlqG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO~ HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94.5# Cond. Surface 110' 30" 8 cu yds Poleset 10-3/4" 45.5# J-55 Surface 3954' 13-1/2" 2522 cu ft 7-5/8" 29. 7# L-80 Surface 10960' 9-7/8" 1608 cu ft 5-1/2"i 17# 13CR-80 10665' 13190' 7-5/8" 230 sx Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and i25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4 spf 3- 1/2"x 2-7/8" 12824' 12712' MD TVD 12914'-12946' 8695'-8723' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIALUSED 27. PRODUCTION TEST Date First Production JMethod of Operation (Flowing, gas lift, etc.) 2/16/92 I Gas Lift Date of'- Test Hours Tested PRODUC'rlON FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE JGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED J o N 111992 Alaska .0J~ & Gas Cons. Commission Form 10-407 -- ,~gb'irnlt in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE ~. ~ 30. I GEOLOGIC MARKERS ,RMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sad/erochit 12898' 8723' Base Sadler° chit 12945' 8722' , : 'i ' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed j~. (, ~~(/r TilleDriJlingEngineerSuoervisor Dale INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24 · If this well is completed for separate production from more than one interval (multiple completion),-so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate"none". RECEIVED Form 10-407 J JN 1 ? 99'Z Alaska Oil & Gas Cons. 'Anchorage. ACTIQITY SUMMARY for WELI~-~ROJECT 4J0138 COMPANY: BP/AAI SHARED SERVICE, NORTH SLOPE, AK FIELD : PRUDHOE BAY WELL : DS 4-34A Page: 1 DRLG RIG : NABORS 28E WO/COMP RIG: NONE (P1) OTHER: 8.0 01/16/92 (1) TD:13035' (5025) SUPV:BM HOLE ANGLE:34 42 MOVE RIG ON LOCATION MOVE RIG FROM DS 4-41 TO DS 4-34A. (4J0138) DAILY: $ 45,000 CUM: $ MW: 0.0 VIS: 0 45,000 EFC: $ 1,296,625 (SlP1) BOPE: 10.0 CIRC: 1.0 OTHER: 8.0 TRIP: 5.0 01/17/92 ( 2) RIH. MW: 8.5 VIS: 0 TD:13035' ( 0) MOVE RIG. RIG ACCEPTED @ 11:00 HRS, 1/16/92. N/D TREE. SUPV:BM N/U BOPE. TEST BOPE. RIH W/ BHA. CIRC OUT DIESEL. RIH W/ HOLE ANGLE:23 54 3-1/2" DP. (4J0138) DAILY: $ 40,777 CUM: $ 85,777 EFC: $ 1,837,000 (S1P1) CIRC: 3.0 OTHER: 3.0 TRIP: 18.0 01/18/92 ( 3) RIN W/7-5/8 EZSV PLUG MW: 9.8 VIS:104 TD:13345' ( 310) P/U 3-1/2 DP. CBU. P.U 3-1/2 DP. WASH. TAG CEMENT. SUPV:BM CIRCULATE & COND MUD. TEST CSG. TO 3000 PSI. CIRC & COND HOLE ANGLE:23 54 MUD. PUM PILL & POH. RIH. W/EZSV PLUG. · (4J0138) DAILY: $ 58,637 CUM: $ 144,414 EFC: $ 1,837,000 (S1P1) CIRC: 3.0 DRIL:~ll.0 TRIP: 10.0 01/19/92 ( 4) CUTTING WINDOW IN 7-5/8 CSG MW: 9.8 VIS: 84 TD:l1340' ( 0) CONTINUE RIH w/Ezsv. CIRC & COND MUD. POH. P/U 7-5/8 SUPV:BM MILL & RIH TO 10960'. CUT WINDOW IN 7-5/8 CASING FROM 10960 HOLE ANGLE:23 54 TO 10977'. (4J0138) DAILY: $ 53,667 CUM: $ 198,081 EFC: $ 1,837,000 (S1P1) CIRC: 2.0 DRIL: 16.0 TRIP: 6.0 01/20/92 ( 5) RIH W/SEC MILL #2 MW: 9.8 VIS: 84 TD:l1340' ( 0) CUT WINDOW W/SEC. MILL FROM 10977 TO 10986'. CIRC. MILL & SUPV:BM CUT WINDOW TO 11004'. CIRC. POH. P/U SEC. MILL #2. RIH HOLE ANGLE:23 54 WITH MILL #2. (4J0138) DAILY: $ 45,189 CUM: $ 243,270 EFC: $ 1,837,000 (S1P1) BOPE: ·0.5 DRIL: 3.0 TRIP: 20.5 01/21/92 ( 6) CUT WINDOW IN CSG. MW: 9.8 VIS:109 TD:l1340' ( 0) RIH W/ MILL #2. WORK PIPE. CIRC. MILL PLUGGED. POOH. SUPV:BM RIH. CIRC. MILL WINDOW F/ 11004'-11007'. HOLE ANGLE:23 54 (4J0138) DAILY: $ 80,937 CUM: $ 324,207 EFC: $ 1,837,000 (SlP1) CIRC: 4.0 DRIL: 14.5 TRIP: 5.5 01/22/92 ( 7) POOH. MW: 9.8 VIS:.116 TD:l1340' ( 0) MILL WINDOW F/ 11007'-11040' CIRC TWO SWEEPS. POOH. SUPV:LP PIPE TIGHT. CIRC 100 BBLS H~GH VIS SWEEP. WORK PIPE. HOLE ANGLE:23 54 POOH. (4J0138) DAILY: $ 23,904 CUM: $ 348,111 EFC: $ 1,837,000 (S1P1) CIRC: 1.5 OLD PROB: 5.0 OTHER: 2.5 TRIP: 15.0 01/23/92 ( 8) RI~ MW: 9.8 VIS:242 TD:l1340' ( 0) POOH. RIH.BRK CIRC. TAG JUNK AT 10341'. POOH. WASH & SUPV:LP REAM BELOW WINDOW AT 11140'. CBU. PUMP PILL & POOH. RIH. HOLE ANGLE:23 54 (4J0138) DAILY: $ 46,323 CUM: $ 394,434 EFC: $ 1,837,000 ACTIVITY SUMMARY for WELl--PROJECT 4J0138 COMPANY: BP/A3%I SHARED SEKVICE, NORTH SLOPE, AK FIELD : PRUDHOE BAY WELL : DS 4-34A Page: 2 DRLG RIG : NABORS 28E WO/COMP RIG: NONE (S1P1) BOPE: 3.0 CIRC: 5.0 OTHER: 4.0 TRIP: 12.0 01/24/92 ( 9) RIH TD:10580' ( 0) SUPV:LP HOLE ANGLE:23 54 MW: 9.8 VIS: 59 RIH. CBU. RIH. CBU. REVERSE CIRC. COND MUD. PUMP CMT. SLURRY. POOH. REVERSE CIRC. POOH. L/D DP. TEST BOPE. P/U & M/U BHA. RIH. (4J0138) DAILY: $ 100,327 CUM: $ 494,761 EFC: $ 1,837,000 (S1P1) CIRC: 7.0 DRIL: 16.0 TRIP: 1.0 01/25/92 (10) RIH MW: 9.8 VIS: 44 TD:10980' ( 400) RIH. DRILL TO 10800'. CIRC. DRILL TO 10963'. CIRC. SUPV:LP PUMP SWEEP. BEGIN SIDETRACK - FRILL TO 10980'. HOLE ANGLE:23 54 (4J0138) DAILY: $ 143,420 CUM: $ 638,181 EFC: $ 1,837,000 (S1P1) CIRC: 0.5 DRIL: 19.0 TRIP: 4.5 01/26/92 (11) RIH MW: 9.9 VIS: 42 TD:11067' ( 87) DRILL TO 11067'. CBU. PUMP PILL, POOH. RIH. SUPV:LP HOLE ANGLE:23 54 (4J0138) DAILY: $ 64,211 CUM: $ 702,392 EFC: $ 1,837,000 (S1P1) DRIL: 20.0 TRIP: 4.0 01/27/92. (12) DRILLING MW:10.1 VIS: 56 TD:l1503' ( 436) RIH..WASH TO 11067'. DRILL TO 11503'. SUPV:LP HOLE ANGLE:23 54 (4J0138) DAILY: $ 57,700 CUM: $ 760,092 EFC: $ 1,837,000 (S1P1) CIRC: 1.5 DRIL: 5.5 OTHER: 3.0 TRIP: 14.0 01/28/92 (13) RIH MW:10.1 VIS: 65 TD:l1602' ( 99) DRILL TO 11602'. CIRC. PUM PILL. POOH. RIH. PUMP PILL. SUPV:LP POOH. RIH. HOLE ANGLE:23 54 (4J0138) DAILY: $ 63,471 CUM: $ 823,563 EFC: $ 1,837,000 (S1P1) DRIL: 22.0 TRIP: 2.0 01/29/92 (14) DRLG. MW:10.1 VIS: 72 TD:l1980' ( 378) RIH. DRLG F/ 11602'-11980'. SUPV:BM HOLE ANGLE:23 54 (4J0138) DAILY: $ 69,270 CUM: $ 892,833 EFC: $ 1,837,000 (S1P1) CIRC: 1.0 DRIL: 6.5 OTHER: 1.0 SURV: 0.5 TRIP: 15.0 01/30/92 (15) DRLG AHEAD IN 6-3/4 HOLE MW:10.1 VIS: 62 TD:12047'(. 67) DRILLING TO 12023'. CBU. PUMP PILL. POH. RIH. DRILL TO SUPV:BM 12027'. POH. RIH. DRILLING TO 12047'. HOLE ANGLE:23 54 (4J0138) DAILY: $ 87,744 CUM: $ 980,577 EFC: $ 1,837,000 (S1P1) CIRC: 0.5 DRIL: 23.5 01/31/92 (16) CBU TD:12466' ( 419) DRILLING TO 12468' CBU. SUPV:BM HOLE ANGLE:23 54 (4J0138) DAILY: $ 66,276 MW:10.1 VIS: 69 CUM: $ 1,046,~3 EFC: $ 1,837,000 'ACTIVITY SUMMARY for WEL/~ROJECT 4J0138 COMPANY: BP/AAI SHARED SERVICE, NORTH SLOPE, AK FIELD : PRUDHOE BAY WELL : DS 4-34A Page: 3 DRLG RIG : NABORS 28E WO/COMP RIG: NONE (S1P1) BOPE: 3.0 CIRC: 1.0 DRIL: 11.5 SURV: 0.5 TRIP: 8.0 02/01/92 (17) DRLG AHEAD IN 6-3/4 HOLE MW: 0.0 VIS: 62 TD:12673' ( 207) CBU. PUMP PILL. POH. L/D STAB. TEST BOPS. RIH. SUPV:BM DRILLING TO 12673'. HOLE ANGLE:23 54 (4J0138) DAILY: $ 4,863 CUM: $ 1,051,716 EFC: $ 1,837,000 (SlP1) CIRC: 2.0 DRIL: 13.0 TRIP: 9.0 02/02/92 (18) DRLG 6-3/4 HOLE MW:10.1 VIS: 65 TD:12966' ( .293) DRLG TO 12932'. CIRC. POH. L/D MOTOR. P/U NBSTB, BIT & SUPV:BM CHANGE MOTOR. RIH. DRLG TO 12966'. HOLE ANGLE:23 54 (4J0138) DAILY: $ 52,789 CUM: $ 1,104,505 EFC: $~ 1,837,000 (SlP1) CIRC: 2.5 DRIL: 14.0 EVAL: 0.5 TRIP: 7.0 02/03/92 (19) R/U WESTERN ATLAS MW:10.1 VIS: 44 TD:13090' ( 124) DRLG TO 13090'. CIRC. CIRC. POH FOR LOGS. R/U WIRELINE. SUPV:BM HOLE ANGLE:23 54 (4J0138) DAILY: $ 58,031 CUM: $ 1,162,536 EFC: $ 1,837,000 (SlP1) CIRC: 6.0 EVAL: 6.0 OTHER: 3.0 TRIP: 9.0 02/04/92 (20) RIH W/5-1/2 LINER MW:10.1 VIS: 44 TD:13090' ( 0) R/U ATLAS. RIH. R/D ATLAS. L/D 4-3/4 MONEL. RIH. RIH SUPV:BM CIRC. & COND MUD. POOH F/LINER. RIH W/5-1/2 LINER. HOLE ANGLE:23 54 (4J0138) DAILY: $ 146,918 CUM: $ 1,309,454 EFC: $ 1,837,000 (S1P1) CASG: 24.0 02/05/92 (21) TD:13090' ( 0) SUPV:SW HOLE ANGLE:23 54 TIH W/CLEAN OUT ASSY MW:10.1 VIS: 45 P/U 5-1/2 CHROME LINER. TIH W/LINER. CBU. CEMENTED W/230 SX G W. 1.0 Gms D600 + 0.1 GPS D135 + 0.05 GPS D47 + 0.3% D65 + 0.10 % D800. POOH. L/D RUNNING TOOL & CEMENT HEAD. TIH W/4-3/4 BHA & POOH L/D. P/U 4-3/4 MILL & TIH ON 3-1/2 DP. (4J0138) DAILY: $ 134,750 CUM: $ 1,444,204 EFC: $ 1,837,000 (COMP) LOG PERF: 3.0 RUN CSG: 20.5 TEST CSG: 0.5 02/06/92 (22) RUN GYRO. MW: 8.5 Seawater TD:13090 RIH W/ CLEAN OUT ASS'Y. TAG CMT @ 12960'. DRLG CMT F/ PB:13005 12960'-13005' CIRC. TEST LNR LAP. OK. REV CIRC SUPV:SW SEAWATER. POOH. L/D DP. N/D RISER. N/U SHOOTING FLANGE. R/U ATLAS, SPERRY SUN? (4J0138) DAILY: $ 131,079 CUM: $ 1,575,283 EFC: $ 1,837,000 (COMP) LOG PERF: 13.0 OLD PROB: 7.0 OTHER: 1.0 RUN COMP: 3.0 ' 02/07/92 (23) RUNNING COMPLETION TUBING MW: 8.5 Seawater TD:13090 RUN GYRO. PERFORATE FROM 12914 - 12946' R/D WIRELINE. PB:13005 R/U TO RUN TUBING. P/U 2-7/8 TAILPIPE P~CKING UP 2-7/8 SUPV:SW TUBING. (4J0138) DAILY: $ 93,675 CUM: $ 1,668,958 EFC: $ 1,837,000 (COMP) NU ND: 2.0 RUN COMP: 22.0 02/08/92 (24) N/D BOPS MW: 8.5 Seawater TD:13090 RUN 2-7/8 COMPLETION TUBING. TEST TUBING TO 3000 PIS. N/D PB:13005 BOP. SUPV:SW (4J0138) DAILY: $ 379,635 CUM: $ 2,048,593 EFC: $ 2,100,000 ~ 'ACTIVITY SUMMARY for WE}W--~ROJECT 4J0138 COMPANY: BP/AAI SHARED SERVICE, NORTH SLOPE, AK FIELD : PRUDHOE BAY WELL : DS 4-34A Page: 4 DRLG RIG : NABORS 28E WO/COMP RIG: NONE (COMP) NU ND: 3.0 02/09/92 ( 25) TD:13090 PB:13005 SUPV:SW RELEASED RIG MW: 8.5 Seawater N/U & TESTED TREE TO 5000 PSI. FREEZE PRTECTED INJECTION WELL. RELEASED RIG 0900 HRS. 2-8-92. (4J0138) DAILY: $ 56,414 CUM: $ 2,105,007 EFC: $ 2,105,007 PRUDHOE BAY 4- 34A PRUDHOE BAY ALASKA COMPUTATION S P/c=-~RY-SUN DRI'LLZNG SERV1-CES--. ANCHORAGE ALASKA PAGE DRILLING DATE- 2/tl/92 DATE OF SURVEY: 02/06/92 BOSS GYROSCOPIC SURVEY JOB NUMBER: AK-BO-20007 KELLY BUSHING ELEV. = 53.00 OPERATOR' HARGER FT. TRUE MEASD VERTICAL DEPTH DEPTH SUB-SEA COURS COURSE DLS VERTICAL ZNCLN DIRECTION DEPTH DG MN DEGREES DG/IO0 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERT. SECT. 11000 7273.00 11025 7287.27 11050 7302.71 11100 7334.75 '1000 7~99 38 7220.00 57 5 N 72.50 E .00 7234.27 53 16 N 71.!0 E 15.99 7249.71 50 26 N 70.80 E 11.36 7281.75 49 51 N 70.60 E 1.20 7346.38 49 37 N 68.50 E 1.54 2148.00N 7051.00E 7368.1! 2154.40N 7070.50E 738~.53 2160.82N 7089.08E 7408.29 2173.51N 7125.31E 7446.68 2200.10N 7196.82E 7522.9~ 11300 7464.68 11400 7530.89 11500 7598.34 11600 7668.34 11700 7740.06 7411.68 48 50 N 67.10 E 1.38 7477.89 48 13 N 65.20 E 1.55 7545.34 46 56 N 64.30 E 1.45 7615.34 44 12 N 62.80 E 2.94 7687.06 44 9 N 61.80 E .70 2228. 65N 7°66~ . 96E 7598, . ~, 2258.94N 7335.49E 7673.1i 2290.42N 7402.26E 7746.42 2322.20N 7466.20E 78!7.15 2354.59N 7527.89E 7885.94 11800 7812.19 11900 7885.23 12000 7958.93 12100 8032.60 ~200 8106.83 7759.19 43 31 N 60.80 E .94 783.2.23 42 37 N 59.00 E 1.52 7905.93 42 25 N 57.20 E 1.23 7979.60 42 39 N 57.70 E .41 8053.83 41 28 N 60.60 E 2.27 2387.85N 7588.64E 7954.10 2422.09N 7647.72E 8021.00 2457.80N 7705.10E 8086.76 2494.18N 7762.10E 8152.36 2528.54N 7819.59E 8217.79 1230O 8i83.29 12400 8263.38 12500 8346.81 12600 8431.03 12700 8515.00 8130.29 38 46 N 63.40 E 3.25 8210.38 34 44 N 63.60 E 4.04 8293.81 32 9 N 63.10 E 2.59 8378.03 33 5 N 61.60 E 1.24 8462.00 32 40 N 58.60 E 1.68 2558.83N 7876.46E 8281.33 2585.53N 7930.01E 8349.59 2610.25N 7979.27E ,9395.15 2635.28N 8027.03E 8448.38 2662.33N 8074.08E 8501.59 12800 8598.44 12900 868~ . 85 12000 8770.16 85~5.44 34 15 N 53.60 E 3.t8 2693.09N. 8629.85 30 36 N 56.70 E 4.01 2723.78N 8717.!6 27 45 N 60.30.E 3.35 2749.30N 8119.78E 8162.72E 820b.~_.~o~'~E 8554.70 ~6F16 '~ 2 865~ 5" THE CALCULATION PROCEDURES ARE BASED ON THE USE OF MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 8653.58 FEET AT NORTH 71 DEG. 28 MIN. EAST ,AT MD = 13000 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 7t.48 DEG. R£Crclx/rcD Alaska 0il & Gas Boris. gom~ts~-°~ MICROFILMED SB"~--~,,RY-SUN DRZLLZNG SERVZCES ANCHORAGE ALASKA .PAGE 2 PRUDHOE BAY DRZLLZNG 4-34A PRUDHOE BAY ALASKA COHPUTATZON DATE' 2/11/92 DATE OF SURVEY: 02/06/92 JOB NUMBER: AK-BO-20007 KELLY BUSHZNG ELEV. = OPERATOR: HARGER 53.00 FT. ZNTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTTCAL VERT:I:CAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDZNATES NORTH/SOUTH EAST/WEST MD-TVD VERTZCAL DIFFERENCE CORRECTZON 11000 7273.00 7220.00 2148.00 N 7051.00 E 12000 7958.93 7905.93 2457.80 N 7705.10 E 13000 8770.16 8717.16 2749.30 N 8205.23 E 7700 404! .07' 314.07 4229 · 84 188.77 THE CALCULATZON PROCEDURES ARE BASED ON THE USE MTNTMUM CURVATURE METHOD. PRUDHOE BAY DRZLLZNG 4-34A PRUDHOE BAY ALASKA CONPUTATZON DATE: 2 S~RY-SUN DRZLLZNG SERVZCES ANCHORAGE ALASKA PAGE DATE OF SURVEY' 02/06/92 / 11/92 JOB NUHBER' AK-BO-20007 KELLY BUSHZNG ELEV. = OPERATOR' HARGER 53.00 FT. ZNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTZCAL VERTZCAL RECTANGULAR COORDZNATES MD-TVD VERTZCAL DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DZFFERENCE CORRECTZON 11000 7273.00 7220.00 2148.00 N 705t.00 E 3727.00 11128 7353.00 7300.00 2180.69 N 7145.72 E 3775.31 48.31 11282 7453.00 7400.00 2223.45 N 7254.66 E 3829.26 53.95 11433 7553.00 7500.00 2269.32 N 7357.96 E 3880.19 50.93 11578 7653.00 7600.00 2315.35 N 7452.77 E 3925.50 45.31 11718 7753.00 7700.00 2360.53 N 7538.97 E 3965.04 39.54 11856 7853.00 7800.00 2406.82 N 7622.23 E 4003.16 38.12 11991 7953.00 7900.00 2454.87 N 7700.55 E 4038.97 35.81 12127 8053.00 8000.00 2504.23 N 7777.99 E 4074.74 35.77 12260 8153.00 8100.00 2547.51 N 7854.40 E 4107.86 33.12 12387 8253.00 8200.00 2582.28 N 7923.46 E 4t34.30 26.44 12507 8353.00 8300.00 2612.01 iq 7982.74 E 4154.31 20.01 12626 8453.00 8400.00 2642.09 iq 8039.63 E 4173.23 1E,.92 12745 8553.00 8500.00 2675.64 N 8094.88 E 4192.32 '19.09 12865 8653.00 8600.00 2713.66 N 8148.68 E 4212.08 19.76 13000 8770.16 8717.16 2749.30 ~4 8205.23 E 4229.8~ 17.76 THE CALCULATZON PROCEDURES USE A LZNEAR ZNTERPOLATZON BETYlEEN THE NEAREST 20 FOOT MD (FROM i'4ZNZMUM CURVATURE) COMPLETION DATE ,.-~ !,~ ! ~"~ CO. COrel'ACT /~/~ ¢ o I' ' ~OGC~C GEOLOGICAL MATERIALS INYENT'ORY LIST { check off or list ~ata as it is received J ~ , cored i~te~ls core ~nalysis,. ~ ~ d~ ditFh inZe~ais , ~ digital data ,, " ,, ,, "' LOG TYPE ' " RUN INTEFtVAI"~; SCALE ..... NO. ~! D,~,,/.... .z'~',¢~,~ .r-~/~/ Z~_~./ /-~'z~~-,, /~ /~ ' '~" ~ ~" PFc ~.~ P~v (~.~~) I /~~/- /~?~ ~" ..... ,, , , , , , ~] 14} ~ ...... i i i i i u ii i i iii ;11 i ii i ii i i i ii i i i MAY 29, 1992 DAVE NAKAMURA BP EXPLORATION ALASKA INC. P O BOX 196612 ANCHORAGE, ALASKA 99518-6612 RE: 84-0097 PRUDHOE BAY UNIT DS3-34 P&A 92-0018 PRUDHOE BAY UNIT DS3-34A 407 78-0064 PRUDHOE BAY UNIT DS14-5 P&A 92-0001 PRUDHOE BAY UNIT DS14-5A 407 81-0147 PRUDHOE BAY UNIT DSll-3 P&A 92-0008 PRUDHOE BAY UNIT DS4-34A 407 91-0077 PRUDHOE BAY UNIT DS4-39 407 90-0110 PRUDHOE BAY UNIT L5-26 407 DEAR MR. DAVE NAKAMURA, A REVIEW OF OUR FILES INDICATE THAT BP EXPLORATION ALASKA INC. IS THE OPERATOR OF THE SUBJECT WELL. OUR MONTHLY PRODUCTION REPORTS SHOW THAT THESE WELLS ARE PRODUCING OIL AND WE HAVE NOT RECEIVED COMPLETION REPORTS (407'S) FROM YOU OR THE PLUG AND ABANDONMENT PAPERWORK FOR THE ORIGINAL WELL AS PER OUR CONVERSATION MAY 27. A FORM 407 FOR PLUG AND ABANDONMENT OR WELL COMPLETION WITH DAILY WELL OPERATIONS SHOULD OF BEEN FILED WITH THE COMMISSION WITHIN THIRTY DAYS AFTER THESE WELL WERE COMPLETED. PLEASE LET ME KNOW IF THERE IS ANY PROBLEM WITH SUBMITTING THESE FORMS AS REQUIRED IN A TIMELY MANNER. SINCERELY, STEVE MC MAINS STATISTICAL TECHNICIAN C: ROBERT CRANDALL SR PETR GEOLOGIST /0 ARCO Alask~ Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 5-15-92 REFERENCE: ?~,...~. 4-7ST $~_~ 4-~o 4-~7 ~z-2 4-34A ARCO CASED HOLE FINALS 5.8.92 PDK-~00/C,R/CCL 0mm~x) Run ~. 5-2-92 Inj Prof/Caliper Run 1, 5" 5-2-92 InJ Profile Run 1, ~" 4-30-92 Jewelry Run 1, 5" 5-2-92 Prod Profile Run 1. 5" 5-9-92 PDK-100/GR/ CL (Borax) Run 1, 5-9-92 CCi, (Peri) pm 1, 4-29-92 Prod Profile Run 1, 5-3-92 PITS Run 1, 5-1-92 PITS Run 1, 5-2-92 PITS Run 1, 5-8-92 CCI. (Peri) l~m 1, Please sign and return the attached copy as receipt of data. RECEIVED BY Have A Nice Dayl Sonya Wallace ATO-1529 # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLll~ PB WELL FH, ES R&D # BPX # STATE OF ALASKA TEXACO Atlas Camco Camco Camco Camco Atlas Atlas Camco Camco Camco Atlas MAY 14 TO 'OP 10:45 FROM PD OPS EHG ARCO Aiaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 12t5 May 14, 1992 Mr. R. A. Douglass Conservation Commission 3o01 Pox-cupinc Drive Anchorage, AK 99501 Re: DS 4-34A Permit No, 92-08 APl No. 50-029-22160-01 DS 4-36 Permit No, 91-57 AP1 No. 50-029-22162-00 DS 4~.39 Pcrrnit ,No. 91-77 APl No, 50-029-22151-00 RECEIVED MAY 1; ~.997 Al~sK~ Oil & G~s Gons. Gommission Anohomge Production interval information as requested: 4-34A Interval Or~.n ,~e,~erv~i r -- (MD). Zone 12914-12946' lB 4-36 12352-12375' 4-39 lB 14383-14399' lB 14406-14412' 14416-14422' lB If you have any additional questions, please call me at 263-4290. Sincerely, Tartan C. Collier O/A Surveillance Engineer j . Po~t-lt"' brand fax transmittal memo 7671 ~ of ~ages ~. f ['~,. R.4. ~o~__~t~.s~,~ 1~ ~...Ao~cc I' ~co TOTAL PAGE.001 ** ARCO Ahsh, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 2-21-92 REFERENCE: ARCO OPEN HOLE FINAI~ Run 1, l"&2" Run 1, 2"&5" Run 1, 2'&5" Run 1, 2'&5" Run 1, l"&2" Run 1, 2'&5" Run 1, 2"&5" Hesse sign and return the attached copy u receipt of data. RECEIVED B Have A Nice I~y~ · onya Wallmm ATO-1529 APPROVED_~. Tmns# 92035 # CENTRAL FILE8 CHEVRON #D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL # PHILI2PS # PB WELL FILES R&D #BPX # STATE OF ALASKA #TEXACO FEB 2 5 1992 Alaska 0~1 & Oas Oons. Anchorage ARCO Alaska, Inc. P.O~Box 100360 Anchorage, Alaska 99510 DATE: 2-21-92 1-26-92 PDK-100/GR/CCL R~m 1, 5" Arias 2-7-92 CCL (Peri) R~m 1, 5" Arias 2-6-92 PFC/GR (Pert) R~m 1, 5" . Atlas 2-6-92 GR/CCL R~_m 1, 2"&5" Atlas 2-2-92 Perf Record- R~m 1, 5" Sch 2-2-92 GR/(X~ R!m 1, 5" Sch 12-28-91 CBT Run 1.5" Sch ' 12-28-91 CET Run 1, 5" Sch 2-3-92 CCL (Tubing Cutter) Run 1, 5" Atlas 2-8-92 Collar (Packer Record) R~_m 1, 5" Atlas Please-sign and return the attached COl}Y~ as receipt of data. RECEIVED BY__u/~__~--~ Have A Nice Day~ Sonya Wallace APPROVED ATO-1529 ~- Trans# 9203~ ' # CENTRAL FILES '-- # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL PHIL~ PB WELL FILES R&D BPX STATE OF AIASKA TEXACO RECEIVED FEB 2 5 1992 Alaska Oil & Gas Cons. Commission Anchorage ARCO Aluka, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 2-21-92 REFERENCE: ARCO MAGNETIC TAPE(S) WITH LISTINGS ?/-/~ 7 ** 2~5 11/~13/91y MWD ltmm 16 Job9911126 ¢ z --- / ~4-a& ].-3].-93 / DrilL/AC Jobt77040 Teleco 8perry Atlu Atla~ Please sign and return the attached copy u receipt of dat~ RECEIVED BY 'i~__J~''~ Have A Nice l~yt Sonya Wallace ATO- 1529 CE~ ~ (cHI ~ON D&M # DEDE ,SCHWARTZ (OH/GCT) # EXXON MARATHON MOBIL pm~.I.rps PB WELL FILES R&D BPX STATE OF ALASKA TEXACO * The corrected APl# for 2-34 is 50-029-22234. ** The corrected API# for 2-35 is 50-029-22222. RECEIVED FEB 2 5 1992 Naska Oil & (]as Cons. Commission Anchorage TO: THRU: FROM: MEMORANbUM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION Lonnie C. S _. DATE: Feb. 3, 1992 commissione FILE NO: DA. 23.2 Blair Wondzell sr. Petroleum Engineer TELEPHONE NO: SUBJECT: BOPE Test ~-- ~r~ AAI PBU DS4-34A Permit No. _-9-~-~ Prudhoe Oil Pool Doug Amos~ Petroleum Inspector ~idav Jan,. 31, 1992; I traveled this date from AAI's Gull Island State No. 1 well to AAI's DS4-34A well to witness the BOPE test on Nabors Rig No. 28E. As the attached BOPE Test report indicates there were no failure during this test. In summary, I witnessed the successful BOPE test at AAI's DS4-34A well on Nabors Rig No. 28E. This rig was on our priority BOPE test list, Attachment. 02-00lA (Rev. 6/89) 20/11/MEMO1.PM3 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION BOP Test Report OPERATION: Drlg '~' Wkvr Location: Sec Location (general) ~-~' Well sign Housekeeping (general) Reserve pit Rig# MUD SYSTEMS: Vi sual Audio Trip tank Pit gauge Flow monitor Gas detectors BOPE STACK: Test Pressure Annular preventer Pipe rams b~ ~"~"~ Blind rams ~ Choke line valves Ki~l l~ne valves / Check valve DATE TEST: Initial~ Weekly ~/ Other Representative Permit # '-~TJ/ - ~- 7~ U Casing set ~ /~'~0 ft '~~ Rep ~, A~UHU~TOR SYSTEH: Full ohsrge pressure ~ j ~0(~ ps~g Press ~f~er olosure ..~ ~ ()~ psig Pump incr clo~ press 200 psig rain Full charge press attained / min ~ 5sec Controls: Master Remote L~ Blind switch cover~, KELLY AND FLOOR SAFETY VALVES: .TEST RESULTS: Upper Kelly / ~ Test pressure Lower Kelly J ~' Test pressure Ball type [ b9~ Test'pressure Inside BOP ] ~')~ Test pressure Choke manifold / ~ Test pressure Number valves /'7 Number flanges ~ Adjustable chokes .~- Hydraulically operated choke Failures ~ Test time '/~ ' ';~s Repair or replacement of failed equipment to be made within days. Notify the Inspector, and follow with wr.itten/FAXed verification to Commission office. Remarks: D~stribution: orig - AOGCC c - Operator c - Supervisor C.004 (rev 01/92) J24-HR NOTICE GIVEN? · Wa i ved by: ~///~ Witnessed by: ALASKA OIL AND GAS CONSERVATION COMMISSION January 17, 1992 Michael Zanghi Area Drilling Engineer ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Re: Well Name: DS 4-34A Company ARCO Alaska, Inc. Permit No: 92-08 Sur. Loc. 1263'FSL, 181'FWL, Sec. 26, TllN, R15E UM Btmhole Loc. 1091'FNL, 1989'FEL, Sec. 25, TllN, R15E, UM Dear Mr. Zanghi: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope Pager at 659-3607. Sincerely, ~~!:a~ii~~va~t ion commission BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~"'"" STATE OF ALASKA ALASKA L~L AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill I;111b. Type of well. Exploratory[] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB = 53'feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. 0. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28324 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 1263' FSL, 181' FWL, SEC. 26, T11N, R15E Prudhoe Bay Unit At top of productive interval 8. Well number Number 1146' FNL, 2064' FEL, SEC. 25, T11N, R15E DS 4-34A U-6300610 At total depth 9. Approximate spud date Amount 1091' FNL, 1989' FEL, SEC. 25, T11N, R15E January 16, 1992 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MDand TVD) p rop~/~/, line 28323 @ 1091'feet DS L4-31 @13223/293" feet 2560 13224'MD/8848'TVD[eet 16. To be completed for deviated wells 17. Anticipated pressure (see 2o AAC 25.035 (e)(2)) Kickoff depth ~ooo'feet Maximum hole angle,~E, a9 o Maximum surface 2770pslg At total depth (TVD) ~650psi~ 18. Casing program Setting Depth s~ze Specifications Top Bottom Q~l~lf~~t~ Hole Casing Weight Grade Coupling Length M D TVD M D TVD (in~l~Jlle1~,=,lajeid~a~ A/ready in p/ace 110' ~lmeFm ~il ~, R~.~ Cons, C0[QQ't~ ,~emchoraqe 6-3/4" 5-1/2" 17# CRI$.LS( FL4S 2524' 10700' 7101' 13224' 8848' 275 cu fl Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 13846'MD feet Plugs (measured) 13035'-13543'MD true vertical 8868'TVD feet Pumped 8.5 bbls (192') below EZSV/11 bbls on top EZSV Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor 80' 20" 450 cuft 113' 113' S u rface 3920' 10-3/4" 2522 cu fl 3955' 3486' Intermediate 10965' 7-5/8" 1003 cu fl 11000 7273' Production Liner Perforation depth: measured none true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program IT1 Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby ce~tify/~hat~he foregping is true and correct to the best of my knowledge Signed F (- C-~'~'/ -~~(CommissionTitleAreaDrillin~En~ineeruse Only Permit Number IAPI number IApproval date ISee cover letter ~.2."~ 150-c~.2.?.-,2.,2.1~'O,--,~/ I /-'/'~'~;,,2_ Ifor other requirements Conditions of approval Samples required [] Yes ~ Mud log requir, ed [] Yes /'l~'No Hydrogen sulfide measures [] Yes ;;~3 No Directional survey requ~reo /,'1~ Yes Required working pressure for BO~__E., 1-12M; 1-13M; /IZ[5M; 1-110M; I-I15M; Other: ~,~------'-~'~'~ ......... by order of Approve~~~ Commissioner [ne commission Date Form 10-401 Rev. 12-1 Submit in triplicate DS 4-34 A Operations Summary cont'd OBJECTIVE: DS 4-34 A is being redrilled to an alternate target location due to an unexpected truncation encroachment that resulted in a loss of producable payzone in the initail DS 4-34 well. An alternate target has been identified that is situated approximately 700' to the northwest of the original target position. The geologic prognosis of the new BHL location predicts commercial LOC that is expected to range between 28' to 30' tvd. The redrill objectives of the 4-34 A redrill will be to section mill an 80' window in the intermediate 7-5/8" casing, lay a cement plug across the section, kickoff and drill a new 6-3/4" hole to the new bottom hole location, run open hole logs, run and cement a 5-1/2" 17# 13CR liner and complete with 3-1/2" x 2-7/8" 13CR tubing. Perforating of the Lower Romeo will be performed prior to the running of the completion. BACKGROUND: DS 4-34 was initially spudded on 9/27/91. The well was kicked off at 500' md/tvd with inclination angle being built to 56~. The 10-3/4" casing was run and cemented without incident at 3513' TVD/3970' MD. The intermediate 9-7/8" hole section was then drilled to casing point at 13618' md. Intermediate 7-5/8" casing was then run and cemented with an MTC cretaceous lead slurry and "G" tail system. The intermediate 7-5/8" was set with emergency slips to reduce potential rathole due to the high inclination of the wellbore and its related sensitivity to shale instability. A 6-3/4" production hole was then drilled to TD in the well at 13,840'MD/8868' TVD. Open hole Icg evalution of the production hole did not indicate producable oil column. A gyroscopic survey was run to confirm the MWD directional coordinates - the results of which validated the MWD. DS 4-34 was then temporarily abandoned by positioning an EZSV at 13543' MD and squeezing 8.5 bbls below- an additional 11 bbls of cement was placed on top of the EZSV. The cement top was tagged at 13035' md and 10,000 # of stringweight was slacked off to confirm cement integrity ( witnessed by AOGCC inspector Doug Amos). The well was then displaced to diesel from 2180' md to surface, an FMC dryhole tree was installed & tested and the 10-3/4" x 7-5/8" annulus was freeze protected with 120 bbls of diesel. Nabors 28-E released the rig 0900 hrs 10/20/91. RECEIVED JAN 1 5 t992 Alaska 0il & Gas Cons. Commission Anchorage PBU DS 4-34A(REDRILL) OPERATIONS SUMMARY Procedure Outline: . 2. 3. 4. . J e 10. 11. 12. 13. 14. 15. 16. 17. MIRU drilling rig. Set two-way check valve. ND tree. NU & test BOP's to 5000 psi. Test 7-5/8" packoff to 3000 psi in the FMC GEN-IV and replace if necessary. RIH with section mill and cut 80' window in the 7-5/8" casing from 10,960-11,040' MD. Set a cement plug across 80' window from 10,860 - 11,140' MD. RIH w/steerable system and dress off plug to 11,000'. Kickoff through the section and directionally drill to TD@ 13224'MD/8848'TVD. Run open hole logs. Run and cement 5-1/2" 13 CR liner in the 6-3/4" hole. Clean out liner to PBTD and test to 3000 psi. Displace well to inhibited seawater. Perforate well with wireline unit. RIH with 3-1/2" 13CR completion string. Pressure up to set 7-5/8" packer. Test to 3000 psi. Test tubing x casing annulus to 2500 psi. Space out and land completion. Displace diesel down tubing and U-tube to freeze protect to 2000'. Set two-way check valve. ND BOP's. NU and test new 3" chrome tree to 5000 psi with diesel. Pull two way check valve. Release rig. o Anticipated BHP: o Maximum Anticipated Surface Pressure: o Planned Completion Fluid: 3600 psi @ 8800'SS 2800 psi 8.6 filtered seawater RECEIVED dAN 1 5 t992 Alaska Oil & Gas Cons. Commissio~ :Anchorage PBU DS 4-34A OPERATIONS SUMMARY CONT'D Note: Excess non-hazardous fluids developed from the well operations and as necessary to control the reserve pit fluid level will be pumped down the 7-5/8" x 10-3/4" annulus. The annulus will be left with a non-freezing fluid during any extended period. The annulus will be sealed with 300 sxs of cement followed by Arctic Pak. b. Minimum distances of wells within 200 ft. of the proposed well are: o L4-31: 293' @ 13227' MD/8848TVD c. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.OJ63..o33 ~-~t ],t. doo/c.k,~ ~.~. ck Maximum surface pressure is based on BHP and a full'column of gas to TD (0.10 psi/ft ). e. Based on previous logs on DS#4, no potential productive zones are anticipated above 3500' TVD. f. No potential hazardous levels of H2S are anticipated in this well. RECEIVED JAN 1 5 t99~ Alaska Oil & Gas Cons. Commission Anchorage PRUDHOE BAY DRILLING Structure : O.S. 4 Field : Prudhoe Bay Well · 34 A Location ·Norfh Slope, Alaska Created by : jones For: M COOK Date plotted : lO-Jan-g2 IPIot Reference is 34A Version #1. JCoordinates are in feet reference slot //34. JTrue VerUcol Depths ore reference wellhead, / l-]J~l~ EASTMAN / /JLIIIC H RISTEN SEN -t~7200- - 7400- 8600- Scole 1 ' 100.00 E a st - - > 6600 6600 7000 7200 7.00 76o0 7800 800o 820o 8,~00 8600 8800 , , ~ ~ ~ ~ , ~ , ~ , ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ TD LOCATION: ] 1091' FNL, 1978' FELI SURFACE LOCATION: SEC. 25, T11N, R15E] 1263' FSL, 181' FWL SEC. 26, T11N, R15E r TARGET LOCATION: ] 1146' FNL, 2064' FrE/ ~ SEC.., Tl lN, R15E / / ~ TARG~ / / ~ WD28738 I / ) TMD~13074 ~ / I NORTH 2871 / X / ~ KOP / TIE IN POINT J 57.1 DEG N 72.48 DEG E 1869' FNL, 1952' ~L SEC. 25, T11N, RlbE N 57.63 DEG E 8797' (TO TARGET) 56.99 54.53 52.10 49.7I 3 BEG / lOO' DOGLEG 47.38 45. t0 42.90 K-10 WD27716 TMD=11679 BEP=7873 KOP / TIE-tN POINT WD=7273 TMD=11000 DEP=7366 COO WD27662 TMD=11605 DEP=7824 K-5 TVD=8090 TMD=12189 DEP=8211 AVERAGE ANGLE 42.89 DEG - LCU T'VD=8703 TMD:13026 DEP:8765 8800- TARGET - B/ IVISHAK TVD=8738 TMD=I3074 DEP=8797-- 90001 TD WD=8848 TMD=13224 DEP=8896 t 9200t 9400J I I I I I I I I I I I I I I I I I I I I I I I I I I I I J I I I I [ [ I I I I 6200 6400 6600 6800 7000 7200 7400 7600 7800 8000 8200 8400 8600 8800 9000 9200 9400 9600 9800 10000 Scele 1 ' 100.00 Verticol Section on 70.95 ozimufh with reference 0.00 N, 0.00 E from slot -5400 _ -5200 ~3000 A I --2800 I - -2600 Z - -2400 ~ - ZY' -2200 -2000 .. RECEIVED JAN 1 5 1997. Alaska Oil & Gas Cons. Commissior~ Anchorage _! 3-5,'.v. 5. I B STACK, 00.0 PS"' ;' '1-.., i_ im I I I ANNULAR PREVENTER 7 PIPE RAMS 6 BLIND RAMS 5 DRILLING .! _ - TUI~INa HEAD 2 1.13-3/8' CASING HEAD 2. 5000 PSI TUBING HEAD 3, 1:3-5r8' . 5000 PSI PIPE RAMS 4.5(:X)0 P~! DRILLING SPOOL 5.13.5/B' . 50013 PSi BLIND 8. 1:3-5/8' . 5000 PSI PIPE RAM~ 7.13-5/~ . 5000 PSI AN~ ACCUMULATOR CAPACITY TEST 1, CHECK AND FILL ACCUMU. ATOR RESERVOIR TO PROPER LEVEL WrTH HYDRAULIC FLUID. 2. ASSURE THAT ACCU~LATOR PRESSURE 18 3000 PSi WITH 1500 I~1 DOWNSTREAM OF THE REGULATOR. 3, OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECOF~ THE TIME AND PRES.SURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CFIARGIN~ PUIV~ OFF, 4. RECORD ON THE IADC R~. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIMEE AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND M.~JqlFOLD WITH ARCTIC DIESEL IN VVINTER OR SEAWATER DURING SUMMER MONTHS, 2. CHECK THAT ALL H(CX.D-OOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEP'rl-I THAT TEST PLUG WILL SEAT AJ~ID SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSi AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 0. OPEN ~LAR PREV~ AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRE~E TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRES.SURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5(X)0 PSI UPSTREAM OF VALVE AND WITH ZERO PS1 ~F_A~ BLEED SYSTEM TO ZERO PSI. 9. OPEN PiPE ~, B~CKOF~ RUN~ING JT AND PULL OUT OF HOLE. CLOSE BLIND RAI~ AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAM~ AND RECOVER TEST PLUG, MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. ! 1. TEST ETANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PS1 WITH KOOMEY PUMP 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM, AND .SEND TO DRILUNG SUPERVISOR. 14. PEF:tFORM CO~ BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILUNG OPERATIONS. FOR COMPLETIC.~. WOFU(OVER OPF. FIA~, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST BOP WEEKLY. RECEIVED JAN 1 5 199~ ~las~ :0il & Gas Cons. DAM 11/20/8g BOP SCH (FOR: NAB 2ES) TO FLARE CAVlEM UNIT I CAVlEM UNIT 2 CHOKE MANIFOLD TRIP TANK 170 BBL FILL LINE VOLUME TANK 13;' BBL EQ. D~CH ; 8AND- .~ TRAP 4 BBL 131 BBL 81 BBL DEGA$81NG TANK DESILTER NABORS C~NTRIFUQI~ PIONEER MI( I DEQA88ER DRLGO 8EEFLOW TO PiT -- TO STAND PIPE & KILL LINE I TO DISTRIBUTION VOLUME TANK 180 BBL SUCTION 117 BBL MUD PUMPS WATER 87 BBL SUCTK:)N 134 BBL MUD HOPPER8 & MIXING PUMP8 NABOR$ DRLL~G LTD. '. RIG No. 28E MUD SYSTEM SURFACE FACILITIES TOTAL ACTIVE SYSTEM: 800 BBL TOTAL SURFACE CAPACITY : 970 BBL ** CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE DATE [2 thru 8] ['~ l~hru i3'] ' ' 10. El0 & 13] 12. 13. (4) Casg ~-~/.~ /-/~-¢~_. 14. [14 thru 22] 15. [23 thrb 28] (5) BOPE Other ['29 thru'3i] Company Lease & Well 1. Is permit fee attached ............................................... 2. Is well to be located in a defined pool .............................. 3. Is well located proper distance from property line ................... 4. Is well located proper distance from other wells ..................... 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated $ is wellbore plat included ................... 7. Is operator the only affected party .................................. 8. Can permit be approved before 15-day wait ............................ Does operator have a bond in force .................. ' ................. Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease nLrnber appropriate .......................................... Does well have a unique name & ntrnber ................................ YES £. NO 16. 17. 18. 19. 20. 21. 22. Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. 23. 24. 25. 26. 27. 28. 29. 30. 31. Is a diverter system required ' Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of ~-~-'~"~",~BOPE attached .... Does BOPE have sufficient pressure rating -- test to O~>o psig ..... Does choke manifold comply w/API RP-53 (May 84) ..... ~ ................ Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS' Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... 32. Additional requirements ............................................. 'tEMARKS 9eol ogy' en9 i neer i ng; .. DWd~ MTM~. ECS RPC.,~_, BEW / RAD~ I' JH~,! rev 03/29/91 jo/6.011 INITIAL' GEO1 UNIT oN/OFF POOL CLASS STATUS AREA ~ SHORE , , 0 "rz ~0 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special 'effort has been made to chronologically organize this category of information. Tape Sub file 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL : ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: RUN1 77041 BRAD ESARY B. MARSH 4-34A 50029221600100 ARCO ALASKA INC. ATLAS WIRELINE SERVICES il-FEB-92 RUN2 T. COLLIER 26 liN 15E 1263 181 RUN3 53. O0 52. O0 21.00 CASING DRILLERS OPEN HOLE BIT SIZE (IN) SIZE (IN) DEPTH (PT) 6. 750 7. 625 10960.0 CIRCULATION STOPPED @ O1: 30 03 -FEB-92. WELL IS A REDRILL, KICK OFF POINT @ 10960'. DT CYCLE SKIPS AT 12717' & 12692' DUE TO TOOL STICKING. $ **** FILE HEADER **** FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; depth shifted and clipped curves; all runs merged; no case hole data. DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH BCS 12 646.0 DIL 12 675.0 2435 12623.0 GR 12611.0 $ STOP DEPTH 13039.0 13066.0 13041.0 13040.0 HICROFILMED # BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH LL8 12609.0 12609.0 12639.0 12 662.0 12671.0 12683.0 12694.5 12700.5 12703.5 12704.5 12704.0 12709.0 12714.5 12739.0 12740.0 12 742.0 12 742.0 12742.5 12749.0 12759.5 12760.0 12761.0 12760.0 12767.5 12768.5 12783.5 12789.0 12789.5 12820.0 12834.5 12835.0 12835.5 12834.5 12836.0 12853.0 12856.5 12857.0 12866.0 12876.0 12896.0 12898.5 12898.5 12899.0 12900.0 12909.5 12912.5 12915.5 12916.5 12925.5 12932.5 12935.0 12936.5 12937.0 12936.5 12944.5 12946.0 12945.5 12946.5 12950.0 12952.0 12957.5 12976.0 12992.0 12996.0 12998.5 12997.0 EQUIVALENT UNSHIFTED DEPTH ILM ILD NPHI 12609.0 12609.0 12609.0 12639.0 12661.5 12671.0 12684.0 12684.0 12700.0 12704.5 12709.5 12716.0 12739.0 12741.5 12760.0 12760.O 12760.0 12766.5 12768.5 12789.0 12789.5 12820.5 12834.5 12834.0 12835.0 12856.5 12857.0 12857.0 12866.0 12865.5 12876.0 12876.0 12897.0 12900.0 12900.0 12910.0 12912.5 12916.0 12916.0 12926.5 12932.5 12936.5 12936.5 12936.0 12946.0 12946.5 12951.5 12956.5 12975.0 12992.0 12996.0 DT 12609.0 12671.0 12694.0 12742.5 12 749.0 12759.5 12768.5 12786.0 12837.5 12855.5 12950.0 12999.0 13000.0 13014.5 13053.5 $ MERGED DATA SOURCE PBU TOOL CODE BCS DIL 2435 GR $ REMARKS: CN WN FN COUN STAT 13014.5 13O54.5 13015.0 13054.5 12999.0 RUN NO. PASS NO. 1 4 1 4 1 4 1 4 MERGE TOP 12646.0 12675.0 12623.0 12611.0 TENS & TEND SHIFTED WITH LL8. SP SHIFTED WITH ILD. FUCT & NUCT SHIFTED WITH NPHI. $ : ARCO ALASKA INC. : 4 - 34A : PRUDHOE BAY : NORTH SLOPE : ALASKA 12999.0 MERGE BASE 13039.0 13066.0 13041.0 13040.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR BCS 68 1 2 DT BCS 68 1 3 TENS BCS 68 1 4 TEND BCS 68 1 5 LL8 DIL 68 1 6 ILM DIL 68 1 7 ILD DIL 68 1 8 SP DIL 68 1 9 MTEM DIL 68 1 10 NPHI 2435 68 1 11 FUCT 2435 68 1 12 NUCT 2435 68 1 GAPI 4 US/F 4 LB 4 LBS 4 OHMM 4 OHMM 4 OHMM 4 MV 4 DEGF 4 PU-S 4 CPS 4 CPS 4 4 67 465 06 6 4 84 653 71 5 4 20 789 90 0 4 20 789 90 0 4 O1 741 76 6 4 O1 741 76 6 4 O1 741 76 6 4 O1 741 76 6 4 22 018 24 1 4 98 211 23 1 4 98 211 23 1 4 98 211 23 1 * DATA RECORD (TYPE# O) 994 BYTES * Total Data Records: 52 Tape File Start Depth = 13100.000000 Tape File End Depth = 12609.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet 48 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 12780 datums Tape Subfile: 2 191 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 3 is type: LIS **** FILE HEADER **** FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 5 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 3910.0 13016.5 $ CURVE SHIFT DATA- PA~S TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: PASS NUMBER: BASELINE DEPTH - EQUIVALENT UNSHIFTED DEPTH $ REMARKS: CN WN FN COUN STAT NO LAC DEPTH MATCHING APPLIED. $ : ARCO ALASKA INC. : 4 - 34A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 3 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH GR 68 1 GAPI 2 TENS GR 68 1 LB 3 CCL GR 68 1 4 4 21 990 60 6 4 4 10 579 41 1 4 4 26 165 19 6 * DATA RECORD (TYPE# O) 1014 BYTES * Total Data Records: 290 Tape File Start Depth = 13019.000000 Tape File End Depth = 3891.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet 12 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 73029 datums Tape Subfile: 3 318 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS **** FILE HEADER **** FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 4 0.2500 VENDOR TOOL CODE START DEPTH STOP DEPTH AC 12646.0 13050.0 DIFL 12672.0 13074.0 2435 12617.0 13047.0 GR 12611 . 0 13040.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (PT): TOP LOG INTERVAL (PT): BOTTOM LOG INTERVAL (PT): LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR BHC/ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 03 -FEB-92 FSYS 256 REV GO02 VER 2 130 03 -FEB-92 857 03-FEB-92 13090.0 13065.0 12611.0 13062.0 1800.O TOOL NUMBER 3974 3967 2806 1309 2435 3506 1609/1603 1503 6. 750 10960.0 0.0 NEW DRILL PHPA 10 .i0 44.0 10.5 5.1 157.0 1.030 68.0 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 4 - 34A : PRUDHOE BAY : NORTH SLOPE : ALASKA 0.460 0. 600 0.000 1.180 0.000 THERMAL SANDSTONE 2.65 7.875 1.5 157.0 68.0 0.0 68.0 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units Log CrvCrv Size Length Typ Typ Cls Mod 1 AC BCS 68 1 2 ACQ BCS 68 1 3 CFOC DIL 68 1 4 CHT B CS 68 1 5 CILD DIL 68 1 6 CILM DIL 68 1 7 CLSN 2435 68 1 8 CN 2435 68 1 9 CNC 2435 68 1 10 CSSN 2435 68 1 11 GR BCS 68 1 12 RFOC DIL 68 1 13 RILD DIL 68 1 14 RILM DIL 68 1 15 SP DIL 68 1 16 SPD B CS 68 1 17 TEMP DIL 68 1 18 TTEN BCS 68 1 US/F 4 4 MMHO 4 LB 4 MMHO 4 MMHO 4 CPS 4 PU-L 4 PU-S 4 CPS 4 GAPI 4 OHMM 4 OHMM 4 OHMM 4 MV 4 F/MN 4 DEGF 4 LB 4 4 85 618 83 5 4 20 789 90 0 4 34 640 82 6 4 56 053 8 7 1 4 97 777 48 0 4 99 088 20 0 4 84 023 70 1 4 52 326 75 5 4 98 211 23 1 4 83 368 34 1 4 67 465 06 6 4 90 000 82 6 4 42 417 48 0 4 43 728 20 0 4 09 065 91 1 4 21 589 8 7 1 4 22 018 24 1 4 56 053 8 7 1 * DATA RECORD (TYPE# O) 994 BYTES * Total Data Records: 156 Tape File Start Depth = 13113.000000 Tape File End Depth = 12609.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet 72 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 51104 datums Tape Subfile: 4 234 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Sub file 5 is type: LIS **** FILE HEADER **** FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 5 0.2500 VENDOR TOOL CODE START DEPTH STOP DEPTH AC 12840.0 13010.0 DIFL 12865.0 13040.0 2435 12811.0 12991.0 GR 12805.0 12984.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (PT): TD LOGGER (PT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN PCM AC DIFL $ CABLE HEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR BHC/ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): 03 -FEB-92 FSYS 256 REV G002 VER 2 130 03-FEB-92 924 03-FEB-92 13090.0 13065.0 12611.0 13062.0 1800.0 TOOL NUMBER 3974 3967 2806 1309 2435 3506 1609/1603 1503 6. 750 10960.0 0.0 NEW DRILL PHPA 10.10 44.0 10.5 5.1 157.0 1.030 68.0 0.460 157.0 MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: DID NOT TAG BOTTOM ON REPEAT PASS. $ CN : ARCO ALASKA INC. WN : 4 - 34A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA 0.600 0.000 1.180 0.000 THERMAL SANDSTONE 2.65 7.875 1.5 68.0 0.0 68.0 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units 1 AC BCS 68 1 2 ACQ BCS 68 1 3 CFOC DIL 68 1 4 CHT BCS 68 1 5 CILD DIL 68 1 6 CILM DIL 68 1 7 CLSN 2435 68 1 8 CN 2435 68 1 9 CNC 2435 68 1 10 CSSN 2435 68 1 11 GR BCS 68 1 12 RFOC DIL 68 1 13 RILD DIL 68 1 14 RILM DIL 68 1 15 SP DIL 68 1 16 SPD BCS 68 1 17 TEMP DIL 68 1 18 TTEN BCS 68 1 API API API API Log Crv Crv Size Length Typ Typ Cls Mod US/F 4 4 MMHO 4 LB 4 MMHO 4 MMHO 4 CPS 4 PU-L 4 PU-S 4 CPS 4 GAPI 4 OHMM 4 OHMM 4 OHMM 4 MV 4 F/MN 4 DEGF 4 LB 4 4 85 618 83 5 4 20 789 90 0 4 34 640 82 6 4 56 053 87 1 4 97 777 48 0 4 99 088 20 0 4 84 023 7O 1 4 52 326 75 5 4 98 211 23 1 4 83 368 34 1 4 67 465 06 6 4 90 000 82 6 4 42 417 48 0 4 43 728 20 0 4 09 065 91 1 4 21 589 87 1 4 22 018 24 1 4 56 053 87 1 * DATA RECORD (TYPE# O) 994 BYTES * Total Data Records: 79 Tape File Start Depth = 13057.000000 Tape File End Depth = 12801.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet 72 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 92505 datums Tape Subfile: 5 Minimum record length: Maximum record length: 155 records... 62 bytes 994 bytes Tape Subfile 6 is type: LIS **** FILE HEADER **** FILE HEADER FILE NUMBER: 5 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 5 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 3910.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 13016.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CCL CASING COLLAR GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : 06-FEB-92 FSYS 256 REV G002 VER 2 0 959 06-FEB-92 13002.0 12976.0 3900.0 12974.0 3000.0 TOOL NUMBER 2346 1309 0.000 13002.0 0.0 SEAWATER 0.00 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.000 0.0 REMARKS: CN : ARCO ALASKA INC WN : 4 - 34A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 TEN GR 68 3 TTEN GR 68 4 CCL GR 68 5 SPD GR 68 1 GAPI 4 1 LB 4 1 LB 4 1 4 1 F/MN 4 4 21 990 60 6 4 10 579 41 1 4 10 579 41 1 4 26 165 19 6 4 O9 221 06 6 * DATA RECORD (TYPE# O) 1014 BYTES * Total Data Records: 870 Tape File Start Depth = 13019.000000 Tape File End Depth = 3891.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet 2O **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 270183 datums Tape Subfile: 6 934 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS **** FILE HEADER **** FILE HEADER FILE NUMBER: 6 RAW CASED HOLE REPEAT PASSES Curves and log header data for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12795.0 LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (PT): TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (PT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CCL CASING COLLAR GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): STOP DEPTH 12997.0 06-FEB - 92 FSYS 256 REV GO02 VER 2 0 946 06-FEB- 92 13002.0 12976.0 3900.0 12974.0 3000.0 TOOL NUMBER 2346 1309 0.000 13002.0 0.0 SEAWATER 0.00 0.0 0.0 0.0 0.0 0.000 0.000 0.000 0.000 0.000 0.000 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.000 TOOL STANDOFF (IN) : O . 0 REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 4 - 34A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units 1 GR GR 68 2 TEN GR 68 3 TTEN GR 68 4 CCL GR 68 5 SPD GR 68 1 GAPI 1 LB 1 LB 1 1 F/MN API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 21 990 60 6 4 4 10 579 41 1 4 4 10 579 41 1 4 4 26 165 19 6 4 4 76 115 41 1 * DATA RECORD (TYPE# O) 1014 BYTES * Total Data Records: 21 Tape File Start Depth = 12999.000000 Tape File End Depth = 12783.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet 2O **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 97696 datums Tape Subfile: 7 85 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 8 is type: LIS * * * * TAPE TRAILER * * * * 92/ 2/ 7 O1 **** REEL TRAILER **** 92/ 2/13 O1 Tape Subfile: 8 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 13 FEB 92 8:25a Elapsed execution time = 1 minute , 43.3 seconds. SYSTEM RETURN CODE = 0