HomeMy WebLinkAbout201-174Imam_ Project Well History File Cove?L, age
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
Organizing Ido,,:~ []
RESCAN
Color items:
[] Grayscale items:
r-] Poor Quality Originals:
Other:
NOTES:
DIGITAL DATA
Diskettes, No. I
[] Other, No/Type
BY: BEVERLY ROBIN VINCENT SHERY~WINDY..
Project Proofing
BY:
BEVERLY ROBIN VINCENT SHERY~INDY
Scanning Preparation
x30= +
BY:
BEVERLY ROBIN VINCENT SHERYL~WlNDY
OVERSIZED (Scannable)
[] Maps:
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
n Logs of various kinds
[] Other
Production Scanning
Stage I PAGE COUNT FROM SCANNED FILE:
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: X YES
IF NO IN STAGE t~ PAGE(S) DISCREPANCIES WERE FOUND:
NO
BY:
Stage 2
YES NO
BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES )
RESCANNEDBT: BEVERLY ROBIN VINCENT SFIERYL MARIA WINDY DATE:
Isl
General Notes or Comments about this file:
Quality Checked
12110102Rev3NOTScanned.wpd
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _lnserts\Microfilm _ Marlœr.doc
Permit to Drill 2011740
MD 13305 ~' TVD
DATA SUBMITTAL COMPLIANCE REPORT
1012212003
Well Name/No. PRUDHOE BAY UNIT P-15L1 Operator BP EXPLORATION (ALASKA) INC
8949 ~--' Completion Date 10/2/2001 ~'~ Completion Status 1-OIL Current Status 1-OIL
APl No. 50-029-22120-60-00
UIC N
REQUIRED INFORMATION
Mud Log N._~o Samples No
Directional Survey
DATA INFORMATION
Types Electric or Other Logs Run: '
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
Log Log
Scale Media
Run
No
(data taken from Logs Portion of Master Well Data Maint)
Interval OH I
Start Stop CH Received Comments
ED C Pds (./1~476
ED ~
ED C Pds
Rpt
Directional Survey
............................................................... Directional Survey
1
FINAL
1
FINAL
12206 13305
12206 13305
Open 12/21/2001
Open 10/15/2001
Open 12/21/2001
Open 10/15/2001
Directional Survey Digital
Data
Directional Survey Paper
Copy
Well Cores/Samples Information:
Name
Start
Interval
Stop
Sent Received
Sample
Set
Number
Comments
ADDITIONAL INFORMATION
Well Cored? Y ~
Chips Received? ~
Analysis Y/.bt.----"-"-
Received?
Daily History Received?
Formation Tops
Compliance Reviewed By:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
I~ Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 201-174
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22120-60
...... 1,,~ ·
4. Location of well at surface '"'{;Ti"':'.'~t"~"~';'~h' "i , [0~'~ l'i 9. Unit or Lease Name
,.
2437' NSL, 2133' EWL, SEC. 31, T11N, R13E, UM i /~ '~-_h.~.L.,~ !~Prudhoe Bay Unit
top o, p oduct,ve ,nte a,
2415' SNL, 1792' EWL, SEC. 05, T10N, R13E, UM
At total depth ~ ............ ;' ~-~ 10. Well Number P-15L1
3439' SNL, 1943' EWL, SEC. 05, T10N, R13E, UM
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 91.91' ADL 028289
12. Date Spudded9/28/2001 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'9/30/2001 10/~2001 115' Water depth' if OffshOreN/A MSL 116' N°' °f c°mpleti°nsOne
17. Total Depth (MD+~D) ~ 18. Plug Back Depth (MD+~D) ~19. Directional Suwey ~ 20. Depth where SSSV set121. Thickness of Permafrost
13305 8949 FTI 13305 8949 FTI ~Yes ~ No~ (Nipple) 2078' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, RES
23. CAS~NG~ LINER AND CEMENTING RECORD
CASING SE~NG DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOSOM S~ZE CEMENTING RECORD AMOUNT PULLED
,
20" Sudace 110'
,,, ,, ,,
10-3/4" 45.5~ L-80 Sudace 2694' 13-1/2" 2790 cuff Permafrost
, ,, , , , , , , ,
7-5/8" 29.7~ L-80 Sudace 12072' 9-7/8" 1857 cuff Class 'G'
'5-1/2" 17~ NT80-S ' 11813' 12203" '6-3/4" 1'71cuffClass'G' ' ...........
3:~/2,,'x2-~)s,, '8.~/~,1~ L-80 .... 1"i770' ' " 13305'" 3:3/4" unCemented S'l~tted Liner ...................
,, ,, ,, ,,, ,, ,,,,, ,,, ,,,,,, ,,,,, , , ,, , , ,,,,, ,,,,,,, ,, , ,,, , , , ,,,,, ,, , , ,
24. PedoratJons open to Production (MD+TVD of Top and ' '25. ' ' ' ' TUBING R'ECORD ' '
Bottom and intewal, size and number) ,
SIZE DEPTH SET (MD) PACKER SET (MD)
3-1/2" Slotted Liner 2-7/8" Slotted Liner 4-1/2", 12.6~, L-80 11816' 11723'
MD ~D MD TVD
12147' - 12208' 8916' - 8960' 12463' - 13268' 9023' - 8960' 26. ACED, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
12205' Set Whipstock
2000' ;reeze Protected with MeOH
,,,,,
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas li~, etc.)
October 17, 2001 Gas Lift
Date of Test Hours Tested PRODUCTION FOR O~L-BBL GAs'MCF WATER-BBL CHOKE SIZE ~GAS-OIL RATIO
1/10/2002 4 TEST PER~OD 535 1342 258 91~ 2508
ROW Tubing Casing Pressure CALCULATED O~L-BBL 'GAS-MCF WATER-BBL O~L G~AWTY-API (CORR)
Press. 24-HOUR RATE 26.5
.... '28;, ,, ' ........ ..........
Brief descripti'o'n of lith0iogy~ porosi{y, fractures, ~Pparent dip~ 'and ~resence of oil; gas or'water. Sub~it Core chipS.' .... ~' ~'~ '"
:No core samples were taken.
Form 10-407 Rev. 07-01-80
2 2~_bmit In Duplicate
29. 30.
Geologic Markers Formation Tests
Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered
Depth Depth and gravity, GOR, and time of each phase.
45N 12232' 8977'
45P 12238 8981'
45P 13152' 8984'
45N 13176' 8980'
~:i~,-i., ?-, .,..~.-,..::~ ]~ .~ ~.~ ,~i~i~ii~
~'~ ~ ~' 1-,,-,~ ~,..~" ~ ~ ~.." ~..~:'~ ,'~:'~
,, ..~
31. List of AEachments: Summa~ of Daily Drilling Repo~s, Su~eys
32. I hereby ce~ify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble ~ Title Technical Assistant Date ~{- ~3'~~_
P-15L1 201-174
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / APproval No.
, ,,, , , , ,,,,,, , , , , , , ,
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no COreS taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Well: P-15L1 Rig Accept: 09/25/01
Field: Prudhoe Bay Unit Rig Spud: 09/28/01
APl: 50-029-22120-60 Rig Release: 10/02/01
Permit: 201-174 Drilling Rig: Nabors 3S
PRE-RIG WORK
08125/01
RAN 20' X 3.65 DUMMY WHIPSTOCK TO 12,279' ELMD. PULLED OGLV FROM GLM# 3 @ 10,663' SLM, &
LGLV'S FROM GLM # 5 @ 8296' SLM, GLM # 6 @ 6071'SLM, & GLM # 7 @ 2982' SLM. SET DGLV'S IN GLM'S #
7 , 6, & 5. PUMP 350 BBLS CRUDE W/5 BBL METH SPEAR DOWN IA. SET DGLV IN GLM # 3 @ 10,663' SLM.
PUMP AN ADDITIONAL 47 BBLS OF CRUDE DOWN IA, COULD NOT PRESSURE UP. CHECK CATCHER SUB
- EMPTY. BEGIN TROUBLESHOOTING STATIONS.
08/26/01
FINISHED CHECKING GLM'S #'S 5 @ 8296' SLM & # 3 @ 10,633' SLM. ALL DUMMIES CONFIRMED TO BE IN
POCKET. NOTE: INCOMPLETE MITIA, WELL LEFT SHUT-IN.
PUMPED 38BBLS DEAD CRUDE DOWN I.A., PERFORM MITIA TO 2000 PSI - PASSED. BLED IA DOWN TO
100 PSI. RDMO.
08129/01
MITOA PASSED/PPPOT-T PASSED/PT MV & WING FAILED / PT SWAB FAILED
FREEZE PROTECT FLOWLINE -MIRU TO S RISER / PUMP 6 BBLS MEOH@ .5 BPM 400PSI / CATCH SAMPLE
/ CLOSE INLET- TAG / RDMO
09/12/01
WHIPSTOCK SET @ 12205'. LEFT SETTING ROD IN HOLE.
09/13/01
FISH 3/4 INCH WHIPSTOCK SETTING ROD FROM WHIPSTOCK SKATE @ 12,182' WLM. TURN WELL OVER
TO DSO.
09/14/01
PUMP 25 BBL FLOPRO PILL ACROSS PERFS
09/24/01
LOADED AND KILL WELL W/290 BBLS SW @ 5.5 BPM, SPOTTED 40 BBLS OF USED FLO-PRO F/3S, AND
DISPLACED W/160 BBLS SW & 10 BBLS METH. WELL ON VACUUM AT SHUT DOWN. VALVE CREW TO
SET BPV AND C/O MASTER VALVE FOR RIG MOVE.
BP EXPLORATION Page I of 4
Operations Summa Report
Legal Well Name: P-15
Common Well Name: P-15L1 Spud Date: 1/1/1991
Event Name: REENTER+COMPLETE Start: 9/24/2001 End:
Contractor Name: NABORS Rig Release: 10/2/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
i9/25/2001 04:00 - 06:00 2.00 RIGU P PRE MOVE TO WELL P15 AND RIG UP RIG. NU BOP's
06:00 - 10:30 4.50 RIGU N RREP PRE REPAIR PIT SUCTIONLINES
10:30 - 12:00 1.50 RIGU P PRE PULL BPV WITH LUBRICATOR AND SET TWC.
12:00 - 15:30 3.50 RIGU P PRE RIG UP FOR BOP TEST
15:30 - 21:30 6.00 RIGU P PRE i TEST BOP'S. WITNESSING OF TEST WAIVED BY AOGCC
INSPECTOR JOHN SPAULDING.
21:30 - 23:30 2.00 RIGU P PRE RU AND PRESSURE TEST LINES TO FLOW BACK TANK
23:30 - 00:00 0.50 RIGU P PRE HOUSEKEEPING DRILL FLOOR AND WELL CELLAR.
9/26/2001 00:00 - 06:30 6.50 RIGU N WAIT PRE CONTINUE TO WAIT ON COIL UNIT, (CHANGING OUT
REELS)
06:30 - 09:30 3.00 RIGU N WAIT PRE LOWER DERRICK & WELD SAFETY CHAINS TO DERRICK
FINGERS TO COMPLY WITH DERRICK AUDIT W/WAITING
ON COIL UNIT TO ARRIVE.
09:30 - 12:15 2.75 RIGU P . PRE RIG UP COIL UNIT
;12:15 - 16:45 4.50 CLEAN P 'DECOMP STAB IN COIL, M/U COIL CONNECTOR & PT SAME, OK.
CIO PACKOFF & PT SAME, OK. PUMP 15/16" BALL &
DISPLACE W/BIOZAN. PRESSURE TEST MHA & M/U
STINGER & NOZZLE.
16:45- 19:15 2.50 CLEAN P DECOMP RIH WITH NOZZLE TO 12170.
19:15 - 19:45 0.50 CLEAN P DECOMP DISPLACE 30 BBL SAFE CARB PILL TO NOZZLE
19:45 -20:30 0.75 CLEAN P DECOMP LAY IN SAFECARB PILL WHILE POOH 75% RETURNS
20:30- 00:00 3.50 CLEAN P DECOMP POH LOSS RATE INCREASED TO 50%.
9/27/2001 00:00 - 02:45 2.75 STWHIP P WEXIT RIH W/ WINDOW MILLING BHA. LOSS RATE INCREASED
TO 50% LOSSES.
02:45 - 04:30 1.75 STWHIP P !WEXIT W/BIT @ 10,500', BULLHEAD 2ND PILL DOWN KILL LINE,
(30 BBLS/60# PER BBL) CALCIUM CARBONATE.
04:30 - 06:15 1.75 ST'WHIP P :WEXIT MILL SWN NIPPLE. 15-20 BBL/HR LOSS RATE DURING
MILLING OPS.
06:15 - 08:30 2.25 S'I'WHIP P :WEXIT RIH, TAG WHIPSTOCK @ 12,201', (UNCORRECTED). LOSS
RATE UP TO 30 BBLS/HR. BULLHEAD 3RD PILL, (30
BBLS/60# PER BBL) CALCIUM CARBONATE. SEE
i PRESSURE INCREASE WHEN PILL @ PERFS INCREASE
!TO 950 PSI BULLHEADING @ 1-1.5 BPM. BULLHEAD 22
BLS INTO FORMATION & OPEN UP TO OBSERVE. LOSS
RATE DOWN TO 10-15 BBLS/HR PUMPING @ 2.6 BPM.
08:30 - 18:00 9.50 STWHIP P WEXIT BEGIN MILLING WINDOW @ 12,200.7'. 2.6 BPM/1600 PSI.
52K UP WT, 15K DOWN. FREQUENT STALLING DURING
ONSET OF MILLING OP. SLOW MILLING PROBABLY DUE
IN PART TO CHROME CASING. LOSS RATE CONSTANT @
12-18 BBLS/HR THROUGHOUT. PUNCH THROUGH @
12,205.5' & DRILL FORMATION TO 12,216'. DRESS UP
WINDOW.
' 18:00 - 18:55 0.92 STWHIP P WEXIT PUMP HIGH VIS SWEEP
,18:55 - 19:45 0.83 STWHIP P WEXIT DRY RUN THRU WINDOW
19:45 - 21:50 2.08 ST'WHIP P WEXIT POH LAY IN 50 BBLPILLOF 150,000 LSRV FLO-PRO. NO
CHANGE IN THE RATE OF LOSS OBSERVED LOSS RATE
24-30 BPH. WINDOW MILL 3.78" STRING MILL IN GAUGE
21:50 - 23:30 1.67 S'I'WHIP P WEXIT CHANGE OUT WINDOW MILL FOR BUILD ASSEMBLY
23:30 - 23:45 0.25 S'I'WHIP P WEXIT PRESSURE TEST MOTOR HEAD ASSEMBLY
23:45 - 00:00 0.25 S'I'WHIP P WEXIT RIH
9/28/2001 00:00 - 00:20 0.33 DRILL P PROD1 RIH TO 3200' TEST ORIENTER O.K.
00:20 - 03:00 2.67 DRILL P PROD1 RIH TO 12080 TIE-IN WITH GR +2' CORRECTION (TOW @
12,203' & BOW @ 12,208').
Printed: 10/8/2001 1:15:56 PM
BP EXPLORATION Page 2 of 4
Operations Summa Report
Legal Well Name: P-15
Common Well Name: P-15L1 Spud Date: 1/1/1991
Event Name: REENTER+COMPLETE Start: 9/24/2001 End:
Contractor Name: NABORS Rig Release: 10/2/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/28/2001 03:00 - 04:30 1.50 DRILL P PROD1 CHANGE OVER TO MUD. LOSSES UP TO 90 BPH WHILE
CIRCULATING. WELL STATIC WHILE CIRCULATING
ACROSS THE TOP OF THE WELL.
04:30- 06:45 2.25 DRILL N WAIT PROD1 ADVISED ANCHORAGE OFFICE AWAIT DECISION.
06:45 - 08:00 1.25 DRILL P PROD1 DRILL AHEAD CHANGING OVER TO KCL WATER. DRILL F/
12,216'-12,300'. 2.6 BPM @ 2350 PSI FREESPIN, 150-200 DP
ON MOTOR. ROP 70-100 FPH. LOSS RATE DROPPED TO
12-18 BPH ON KCL.
08:00 - 08:45 0.75 DRILL P PROD1 P/U & CHECK SURVEYS, SEND ROTATE COMMAND TO
ORIENTER.
08:45 - 09:15 0.50 DRILL P PROD1 ROTATE TO HS TOOLFACE. TF CHANGING VERY
SLOWLY.
09:15 - 11:15 2.00 DRILL P PROD1 DRILL AHEAD TO 12,370'. LAND BUILD W/FINAL
INCLINATION OF 89.7 DEG. TVD OF 8928', (TARGET WAS
8931'). PUMP FLO PRO SWEEP.
11:15 - 14:30 3.25 DRILL P PROD1 POOH, FLAG EOP @ 11,500', MONITOR WELL @ 500',
WELL STABLE.
14:30 - 16:00 1.50 DRILL P PROD1 L/D BUILD SECT BHA, DOWNLOAD RESISTIVITY TOOL.
16:00 - 17:30 1.50 DRILL P PROD1 M/U LATERAL SECT BHA & RESISTIVITY TOOL.
17:30 - 18:15 0.75 DRILL P PROD1 RIH, SHALLOW HOLE TEST@ 3200', OK.
18:15 - 20:50 2.58 DRILL P PROD1 RIH TO 12080. TIE IN WITH GR. MWD FAILED. TOOL
SHUTING ITSELF DOWN AFTER EVERY 4TH DATA CYCLE.
THE SOFT WARE INTERFACE BETWEEN THE REAL TIME
RESTIVITY TOOL AND THE MWD HAS BEEN IDENTIFIED
AS THE PROBLEM. THIS IS A KNOWN PROBLEM AND AN
APPROVED PATCH HAD BEEN INSTALLED. ANADRIL WILL
. INVESTIGATE THE LEVEL OF TESTING THAT WAS
CONDUCTED ON THIS PATCH.
20:50 - 22:35 1.75 DRILL N DFAL PROD1 POH TO CHANGE MODE FROM REAL TIME RESTIVITY TO
MEMORY.
~22:35 - 00:00 1.42 DRILL N DF^L PROD1 CHANGE OPERATING MODE OF THE RESTIVITY LOG.
ADDITIONALLY THE BAKER MOTOR HAD END-PLAY IN
THE BIT SUB AND WAS CHANGED OUT FOR AN ANADRIL
MOTOR.
9/29/2001 I00:00 - 00:30 0.50 DRILL N DFAL PROD1 CONTINUE TO CHANGE OUT BHA.
00:30 - 01:00 0.50 DRILL N DFAL PROD1 RIH TO 3300' AND TEST TOOL OK.
01:00 - 02:30 1.50 DRILL N DFAL PROD1 RIH TO12073 TIE IN. ZERO CORRECTION.
02:30 - 04:00 1.50 DRILL P PROD1 RIH TO 12370. PU 40M SO16M FREE SPIN PRESSURE
2100PSI @ 2.8 BPM, 180 PSI MOTOR WORK,LOSS RATE .2
BPM. DRILL TO 12400. SGORT TRIP TO WINDOW 214'
04:00 - 06:45 2.75 DRILL P PROD1 DIRECTIONAL DRILLING TO 12420 SHORT TRIP TO
WINDOW 264' ORIENTATE TO CONTINUOUS ROTATION
DRILL TO12520".
06:45 - 07:15 0.50 DRILL P PROD1 160' WIPER TRIP.
107:15 - 08:30 1.25 DRILL P PROD1 DRILL TO 12575'.
~08:30 - 09:00 0.50 DRILL P PROD1 WIPER TO WINDOW 369'. OVERPULL IN SHALE AT 12530'.
:09:00 - 11:45 2.75 DRILL P PROD1 DRILL 2.7/2.5 TO 12670'. STACKING.
:11:45- 12:30 0.75 DRILL P PROD1 WIPER TO WINDOW 467'.
112:30 - 14:45 2.25 DRILL P PROD1 DRILL TO 12750'.
; 14:45 - 15:30 0.75 DRILL P PROD1 WIPER TO WINDOW 544'.
15:30- 16:40 1.17 DRILL P PROD1 DRILL to 12800'.
16:40 17:05 0.42 DRILL P PROD1 WIPER TRIP 300'
Printed: 10/8/2001 1:15:56 PM
BP EXPLORATION Page 3 of 4
Operations Summa Report
Legal Well Name: P-15
Common Well Name: P-15L1 Spud Date: 1/1/1991
Event Name: REENTER+COMPLETE Start: 9/24/2001 End:
Contractor Name: NABORS Rig Release: 10/2/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
9/29/2001 17:05- 18:15 1.17 DRILL P PROD1 DRILL TO 12850'
18:15 - 19:00 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW 600'.
19:00 - 22:45 3.75 DRILL P PROD1 DRILL TO 12950'
22:45 - 23:15 0.50 DRILL P PROD1 WIPER TRIP 700'.
23:15 - 00:00 0.75 DRILL P PROD1 DRILL AHEAD TO 12,990'.
9/30/2001 00:00 - 00:15 0.25 DRILL P PROD1 FREE SPIN 2450 PSI MOTOR WORK 250 PSI AT 2.8 BPM
LOSS RATE.2BPM DRILLED TO 13000'
00:15 - 02:00 1.75 DRILL P PROD1 DRILL TO 13048' WEIGHT TRANSFER IS CHALLENGING.
02:00 - 02:45 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW.
02:45 - 06:00 3.25 DRILL P PROD1 DRILL WITH NEGATIVE VVT TO 13100'.
06:00 - 08:00 2.00 DRILL P PROD1 WIPER TO WINDOW. TIGHT RIH AT 12850'
08:00 - 10:40 2.67 DRILL P PROD1 DRILL SLOW WITH NEG VVT TO 13147'. STACKING W/O
PROGRESS HERE.
10:40- 12:40 2.00 DRILL P ,PROD1 WlPERTRIP TO 12600'. TIGHT W/MWAT 12880' OUTAND
IN. STALL 12970' RIH. 12K OP. WIPER BACK TO
WINDOW. 16K OP 12888'. 18K OP 12680'. RIH ROTATING.
TIGHT 12680', 12888', 13090' (ALL SHALES).
12:40 - 17:00 4.33 DRILL P PROD1 ;DRILL AT A SNAIL'S PACE TO 13165'. PUMP 8% LUBETEX
PILL. EXCELLENT RESPONSE ON WEIGHT TRANSFER.
I BACK TO POSITIVE DRILLING WEIGHT. 42K UP VS 52K
UP. HIT HARD SPOTAT 13180'. MULTIPLE STALLS HERE.
PUNCHED THRU, BUT LOST VVT TRANSFER AGAIN.
!PUMP A SECOND 30 BBL 8% LUBETEX PILL. GOOD
!RESPONSE AGAIN -- TOOK OFF RUNNIN' TO 13230'.
I DRILL TO 13245'
17:00 - 17:30 0.50 DRILL P PROD1 .WIPER TO WINDOW. OVERPULLS WITH MOTOR WORK
'12975, 12920, 12913, 12900, 12871, 12605. STUCKAT
12605'.
17:30 - 18:45 1.25 DRILL N STUC PROD1 BIT STUCK (STALL'D) IN SHALE AT 12605'. WORK PIPE IN
I DOWN DIRECTION TO MAX NEGATIVE. NO MOVEMENT.
ATTMEPT CONTINUOUS ROTATION WITH ORIENTER --
:NOT MOVING OFF 13R TF. REPEAT WHILE PUSHING AND
PULLING. DIAL-IN LOW LEFT TF. CONTINUE WORKING
PIPE IN DOWNWARD DIRECTION. PUMP ANOTHER 30
BBL PILL WITH 8% LUBETEX AND 1 SACK BIO. LET 10
BBLS EXIT BIT. WORKED BHA FREE IN DOWNWARD
DIRECTION.
18:45 - 19:15 0.50 DRILL P PROD1 FINISH WIPER TRIP TO 12000'. CLEAN THE REST OF THE
WAY.
19:15 - 20:00 0.75 DRILL P 'PROD1 LOG TIE-IN CORRECT DEPTH (+16').
20:00 - 20:30 0.50 DRILL P PROD1 RIH CLEAN TO TD 13258'.
20:30 - 22:00 1.50 DRILL P PROD1 DRILL WITH GOOD SLIDE TO CORRECTED TD 13305'.
22:00 - 23:40 1.67 DRILL P PROD1 WIPER TRIP TO WINDOW AND BACK. HAD TO WORK
12920' SHALE A BIT, OTHERWISE HOLE IN GOOD SHAPE.
23:40 - 00:00 0.33 DRILL P PROD1 LAY IN LUBETEX PILL WHILE POOH.
10/1/2001 00:00 - 02:30 2.50 DRILL P PROD1 POOH.
02:30 - 03:30 1.00 DRILL P PROD1 LD DRILLING BHA
03:30 - 04:00 0.50 DRILL P PROD1 DOWNLOAD MEMORY RESISTIVITY AND FAX TO
ANCHORAGE.
04:00 - 06:00 2.00 CASE P COMP WAIT ON INSTRUCTIONS FOR FINAL LINER
CONFIGURATION.
06:00 - 06:45 0.75 CASE P COMP SAFETY MEETING.
06:45 - 07:30 0.75 CASE P COMP RU TO RUN LINER. ADJUST PIPE ON RACK FOR DESIRED
Printed: 10/8/2001 1:15:56 PM
BP EXPLORATION Page 4 of 4
Operations Summa Report
Legal Well Name: P-15
Common Well Name: P-15L1 Spud Date: 1/1/1991
Event Name: REENTER+COMPLETE Start: 9/24/2001 End:
Contractor Name: NABORS Rig Release: 10/2/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours iActivity Code NPT Phase Description of Operations
10/1/2001 06:45 - 07:30 0.75 CASE P COMP SLOTTED/BLANK.
07:30 - 10:00 2.50 CASE P COMP MU 48 JTS COMBO 2-7/8" AND 3-1/2" SLOTTED
(PREDRILLED 4 SPF)/BLANK LINER. BLANK SECTION IN
OPENHOLE FROM WINDOW TO 12463'.
10:00 - 11:30 1.50 CASE P COMP PU INJ TO FLOOR. REHEAD. PULL AND PT CTC.
DISPLACE METHANOL OUT OF COIL. STAB PIPE.
11:30 - 14:00 2.50 CASE P COMP RIH WITH LINER. CORRECT DEPTH AT FLAG (-4').
SMOOTH TO BOTTOM 13304' CTM. 52K UP.
14:00 - 14:45 0.75 CASE P ~COMP PUMP 5/8" BALL TO CTLRT. SHEAR AT 2600 PSI. FREE.
14:45 - 17:00 2.25 CASE P COMP CIRCULATE WELL ABOVE LINER TO CLEAN 2% KCL
WATER WHILE POOH.
17:00- 20:00 3.00 CASE :N WAIT COMP WAIT ON METHANOL. NO TRUCKS AVAILABLE ALL DAY.
,20:00 - 20:50 0.83 CASE : P COMP DISPLACE COIL WITH METHANOL. LAY IN METHANOL
FROM 2000' TO SURFACE.
20:50 - 21:30 0.67 CASE P COMP LD LINER RUNNING EQUIPMENT
21:30 - 22:00 0.50 RIGD P COMP SET BPV.
22:00- 00:00 2,00 RIGD P COMP RIG DOWN. ND BOPE.
10/2/2001 00:00 - 00:30 0.50 RIGD P COMP RELEASE RIG 00:30 HRS 10/02/2001.
Printed: 10/8/2001 1:15:56PM
ANADRILL
SCHLUMBERGER
Survey report
Client ................... : BP Exploration (Alaska) Inc
Field .................... : Prudhoe Bay
Well ..................... : P-15L1
API number ............... : 50-029-22120-60
Engineer ................. : M. Brown
Rig ...................... : Nabors 3S / Dowell #4
STATE: ................... : Alaska
Survey calculation methods-
Method for positions ..... : Minimum curvature
Method for DLS ........... : Mason & Taylor
Depth reference
Permanent datum .......... : Mean Sea Level
Depth reference .......... : Tie-in @ 12049 ft
GL above permanent ....... : 0.00 ft
KB above permanent ....... : 0.00 ft
DF above permanent ....... : 0.00 ft
Vertical section origin
Latitude (+N/S-) ......... :
Departure (+E/W-) ........ :
0.00 ft
0.00 ft
Platform reference point .....
Latitude (+N/S-) ......... : -999.25 ft
Departure (+E/W-) ........ : -999.25 ft
Azimuth from rotary table to target: 172.36 degrees
1-Oct-2001 00:14:23
Page 1 of 2
Spud date ................ : 27-Sep-01
Last survey date ......... : 01-Oct-01
Total accepted surveys...: 25
MD of first survey ....... : 12199.60 ft
MD of last survey ........ : 13305.00 ft
Geomagnetic data
Magnetic model ........... : BGGM version 2000
Magnetic date ............ : 27-Sep-2001
Magnetic field strength..: 1149.32 HCNT
Magnetic dec (+E/W-) ..... : 26.39 degrees
Magnetic dip ............. : 80.73 degrees
MWD survey Reference Criteria
Reference G .............. : 1002.68 mGal
Reference H .............. : 1149.32 HCNT
Reference Dip ............ : 80.73 degrees
Tolerance of G ........... : (+/-) 2.50 mGal
Tolerance of H ........... : (+/-) 6.00 HCNT
Tolerance of Dip ......... : (+/-) 0.45 degrees
Corrections
Magnetic dec (+E/W-) ..... : 26.39 degrees
Grid convergence (+E/W-) .: 0.00 degrees
Total az corr (+E/W-) .... : 26.39 degrees
(Total az corr = magnetic dec - grid cony)
Sag applied (Y/N) ........ : No degree: 0.00
[ (c) 2001 Anadrill IDEAL ID6_iC_10]
ANADRILL SCHLUMBERGER Survey Report
Seq Measured Incl Azimuth Course
# depth angle angle length
- (ft) (deg) (deg) (ft)
1 12199.60 42.40 150.70
2 12216.96 43.39 151.79
3 12268.96 64.88 155.07
4 12298.00 74.00 156.90
5 12316.00 75.50 158.04
6 12339.79 80.19 159.54
7 12392.84 89.05 150.98
8 12443.75 88.83 153.74
9 12494.60 89.93 156.93
10 12543.87 90.95 160.27
11 12593.96 90.35 165.19
12 12642.92 91.98 172.62
13 12670.72 91.80 174.89
14 12719.04 89.58 176.94
15 12769.07 88.50 178.00
16 12819.60 90.85 182.39
17 12869.29 91.68 186.39
18 12920.59 97.38 190.89
19 12970.55 99.13 187.12
20 13016.62 97.58 181.64
0.00
17.36
52.00
29.04
18.00
23.79
53.05
50.91
50.85
49.27
50.09
48.96
27.80
48.32
50.03
50.53
49.69
51.30
49.96
46.07
21 13068.89 97.80 178.99 52.27
22 13119.17 96.83 174.24 50.28
23 13191.27 101.43 172.07 72.10
24 13275.06 105.55 177.74 83.79
25 13305.00 108.00 178.00 29.94
depth
(ft)
8862.10
8874.82
8905.11
8915.30
8920.03
8925.04
8930.02
8930.97
8931.52
8931.14
8930.57
8929.58
8928.66
8928.08
8928.92
8929.21
8928.11
8924.06
8916.89
8910.19
8903.20
8896.80
8885.37
8865.81
8857.17
1-0ct-2001 00:14:23
Page
2 of 2
Vertical Displ Displ Total At DLS
section +N/S- +E/W- displ Azim (deg/
(ft) (ft) (ft) (ft) (deg) 100f)
.5O
.18
.77
.81
.47
5409.45 -4831.00
5420.47 -4841.36
5460.15 -4878.89
5486.21 -4903.71
5502.99 -4919.75
4673
4679
4697
4708
4715
.87
.96
.57
.79
.77
5525.59 -4941.42
5575.97 -4989.29
5623.79 -5034.38
5672.40 -5080.58
5720.25 -5126.44
4723
4745
4769
4790
4808
5769.62 -5174.25
5818.44 -5222.25
5846.22 -5249.87
5894.44 -5298.06
5944.26 -5348.03
4823.64
4833 . 05
4836.07
4839.51
4841.72
5994.30 -5398.54 4841.55
6042.88 -5448.07 4837.75
6091.93 -5498.59 4830.08
6139.29 -5547.41 4822.34
6183.86 -5592.84 4818.87
6235.16 -5644.64
6284.88 -5694.41
6356.03 -5765.06
6437.38 -5846.16
6465.91 -5874.81
6721
6733
6772
6798
6814
.62
.02
.94
.48
.66
135.95
135 . 98
136.08
136.16
136.21
6836
6886
6934
6983
7028
.13
.01
.97
.12
.84
136.29
136.43
136.55
136.68
136.83
7073
7115
7137
7175
7214
.92
.50
.84
.67
.13
137.01
137.22
137.35
137.59
137 . 84
7251
7285
7318
7350
7382
.54
.96
.75
.43
.51
138.11
138.40
138.70
139.00
139.25
7421.64
7461.46
7520.97
7587.95
7610.71
139.51
139.74
140.04
140.39
140.53
4818.58
4821.53
4830.01
4837.28
4838.35
0.00
7.13
41.63
31.95
10.33
20.65
23.16
5.44
6.64
7.07
9.91
15.53
8.19
6.27
3.01
9.85
8.22
14 . 14
8.27
12.23
5.04
9.57
7.06
8.22
8.23
S rvy
tool
type
TIP
MWD
MWD
MWD
MWD
SP
SP
SP
SP
SP
SP
SP
SP
SP
MWD
SP
SP
SP
SP
SP
SP
SP
SP
SP
MWD
Tool
qual
type
6-axis
6-axis
--
6-axis
--
6-axis
--
--
--
Proj ec ted
[(c)2001 A~adrill IDEAL ID6 lC 10]
12/13/01
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 1696
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Afln: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job # Log Description Date Blueline Sepia Prints CD
P-15L1 21514 ARC DATA 09/30/01 1
P-15L1 21514 MD VISION RESISTIVITY 09/30/01 1 1
P-15L1 21514 TVD VISION RESISTIVITY 09130/01 1 1
P-25L1 21497 ARC DATA 10/10/01 1
P-25L1 21497 MD VISION RESISTIVITY 10/10/01 1 1
P-25L1 21497 TVD VISION RESISTIVITY 10/10/01 1 1
I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc,
Petrotectnical Data Center
Anchorage, Alaska 99508
D,TC 21 7001
Date Delivered:
Gas COns Co-
.4nchorag;
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
Al-tN: Sherrie
Receive~ ~~
bp
Date: 10-12-2001
Transmittal Number:92283
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below. If you have any questions, please contact me in the
PDC at 564-4091.
SW Name Date Media Title
15-36A<::~DI-ib D._ 09-22-2001 HARDCOPY/DISKETTE SURVEY REPORT;
P-15L1 ~..,ODt~_l"Tq 10-01-2001 HARDCOPY/DISKETTE SURVEY REPORT;
L-117 ~DI- ([0"1 09-24-2001 HARDCOPY/DISKETTE SURVEY REPORT;
~ d/~his transmittal.
Thank You,
James H. Johnson
Petrotechnical Data Center
AOGCC
Attn: Lisa Weepie
Phillips Alaska Inc.
Attn: Sandy Lemke
Exxon Mobil Production Co.
Attn: Susan Nisbet
RECEIVED
OCT 1 2001
Alaska Oil & Gas Cor~$. Commi~on
Anchorage
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
ALAS~ OIL AND GA~
CONSERYATION COMMISSION
Thomas McCarty
CT Drilling Engineer
BP Exploration (Alaska) Inc
PO Box 196612
Anchorage AK 99519-6612
TONY KNOWLES, GOVERNOR
333 W. 7TM AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re:
Prudhoe Bay Unit P- 15L 1
CT Drilling Engineer
BP Exploration (Alaska) Inc
Permit No: 201-174
Sur Loc: 2437' NSL, 2133' EWL, SEC 31, T1 IN, R13E, UM
Btmhole Loc. 3411' SNL, 1914' EWL, SEC 05, T10N, R13E, UM
Dear Mr. McCarty:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Annular disposal has not been requested as part of the Permit to Drill application for Prudhoe
Bay Unit P-15L1.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
Cammy Olechsli Taylo3-~
Chair
BY ORDER OF THE COMMISSION
DATED this 24th day of August, 2001
jjc/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA ('"
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill 1 lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 91.91' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028289
,
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
2437' NSL, 2133' EWL, SEC. 31, T11N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
2395' SNL, 1782' EWL, SEC. 05, T10N, R13E, UM P-15L1 Number 2S100302630-277
At total depth 9. Approximate spud date
3411' SNL, 1914' EWL, SEC. 05, T10N, R13E, UM 09/09/01 Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 047471, 3365' MDI No Close Approach 2560 13275' MD / 8892' TVDss
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 12205' MD Maximum Hole Angle 96 o Maximum surface 2144 psig, At total depth (TVD) 8800'/3200 psig
18. Casing Program Specifications Setting Depth
$i[e ToD Bgtlom Quantitv 9f Cement
Hole Casinq Weiqht Grade C0uplinq Lenqth MD TVD MD TVD (include staqe data)
3-3/4" 3-1/2,,x2-ws,9.3,/s.~s# L-80 ST-L 1505' 11770' 8578' 13275' 8892' dncemented Slotted Liner
19. To be completed for Redrill, Re-entry, and Deepen Operations. AUG ~, ;~ ZUU1
Present well condition summary
Total depth: measured 12580 feet Plugs (measured) Alaska 0il & Gas Cons. Commission
true vertical 9238 feet Anchorage
Effective depth: measured 12298 feet Junk (measured)
true vertical 9028 feet
Casing Length Size Cemented M D TVD
Structural
Conductor 110' 20" 110' 110'
Surface 2694' 10-3/4" 2790 cu ft Permafrost 2694' 2694'
Intermediate 12072' 7-5/8" 1857 cu ft Class 'G' 12072' 8865'
Production
Liner 767' 5-1/2" 171 cu ft Class 'G' 11813' - 12580' 8697' - 9238'
Perforation depth: measured 12202'- 12234', 12246'- 12292', 12305'- 12320', 12330'- 12338'
true vertical 8956' - 8980', 8989' - 9024', 9033' - 9045', 9052' - 9058'
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
'"'Contact Engineer Name/Number: Thomas McCarty, 564-5697 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ThomasMcCa'~-~---/~~ ,..¢.,.~.,~'"'~"~ Title CT Drilling Engineer Date (./~:;~/,~',~,~/,~
//"C,om, mission Use Only / !
Permit Number I APl Number I ~:) ~.~ r r~,.~l ~____~e 1 I See cover letter
,,~ O / -- //~/-:// 50- 029-22120-(30 ' ' . for other requirements
Conditions of Approval: Samples Required [] Yes [] No Mud Log Required [] Yes J~ No
Hydrogen Sulfide Measures [] Yes [] No Directional Survey Required ~] Yes [] No
Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K 'I~.5K psi for CTU
Other:
,Ori§inal S~ned By by order of
Approved By r~ r~ ~P~'"'~,~,j~ll,,,~,;i Commissioner the commission Date ~ ' (::::~, ~,.~.t._)
Form 10-401 Rev. 12-01-85
i¥ 'L
Submit In Triplicate
bp
August22,2001
To:
Attention:
Subject:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Tom Maunder
Petroleum Engineer
Well P-15 CTD Sidetrack Prep
BP Exploration Alaska Inc.
Drilling & Wells
Coiled Tubing Drilling Team
Well P-15 is scheduled for a through tubing lateral to be drilled with coiled tubing. The following
summarizes the procedure required to prep P-15 for drilling and is submitted as an attachment
to Form 10-403. A schematic diagram of this proposed completion is attached.
]. Tree wing & master Ya]vcs will be tested.
2,. Using slickline, tbg will be drifted gas lift mandrels will be dummied
3. An MIT-IA will be performed.
4. Using wireline a whipstock will be set at approx 12205'md.
5. Service coil may then mill the window off the whipstock.
The wireline prep work is expected to commence August 29, 2001. Coil tubing drilling operations,
as detailed below will commence September 9, 2001.
]. A 3-3,2' sidetrack, ~1100' long will be drilled out of liner into the zone 4 reservoir.
2. The sidetrack will be completed with a 2-7/8" x 3-1/2", solid & perforated liner combination,
un-cemented in order to continue producing from the original wellbore.
Thomas McCarty
CT Drilling Engineer
Tel' 564-5697
Fax: 564-5510
Cell: 240-8065
mccarttm@bp.com
Well File
Petrotechnical Data Center
Terrie Hubble
BPX
P-15 Sidetrack
Summary of Operations:
A CTD through tubing sidetrack is planned for well P-15. Specific prep work, (Phase 1) and drilling, (Phase 2)
operations are detailed below.
Phase 1: Isolate & integrity test inner annulus (IA). Set whipstock. Mill Window
Completed on August 29, 2001
· Drift well with dummy whipstock.
· Integrity test IA after displacing to seawater & installing dummy gas lift valves.
· Set whipstock using e-line at 12,205' (-8866'tvdss)
· 3.8" window will be milled off the whipstock with service coil time permitting.
Phase 2: Drill and complete sidetrack.
Planned to begin Sept 9, 2001.
2-¼" coil will be used to drill approx. 1100 feet of 3-3A'' OH sidetrack, (as per attached plan) and run a solid /
slotted 2-Vs" x 3-V2" liner completion. The liner will remain un-cemented.
Mud Program: · Phase 1: Seawater
· Phase 2: Seawater/Biozan and Flo-Pro (8.6 - 8.7ppg)
Disposal: · No annular injection on this well.
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program:
· 2 7/8", 6.16#, L-80, X-over to 3V2, 9.3#, L-80 solid & slotted liner be run from 11770' (TOL, -8578tvdss) to TD.
Liner to remain un-cemented. The 3V2 liner will be placed from the TOL down to approx, two joints outside the
window.
Well Control:
· BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional · See attached directional plan
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
· An MWD Gamma Ray log with resistivity will be run over the open hole section.
Hazards
H2S was measured at 25 ppm on July 8, 2001.
Reservoir Pressure
Res. press, is estimated to be 3200 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface is 2144 psi.
TREE = 4-1/16" 5M CIW
WELLHEAD= 5M FMC
'A C~IJ~(~R= ................ 0~is
'BF. ELEV= 54.04
KOP = 3200'
Max ~ngle= 58 @ 888i'
~tum ~s= 8800'
i P-15L1 'i ....
PROPOSED CTD COMPLETION
10-3/4" CSG, 45.5~, L-80, ID: 9.953" I"-~ 2702'
2078' Id4-1/2" OTIS SSSV NIP, ID = 3.813"
GAS LIFT MANDRELS
Minimum ID = 3.725" @ 11799'I
4-1/2 PKR SWN NIP
I
11714'
Id4-1/2" PKR SWS NIP, ID= 3.813"
J Top of Proposed 3-1/2" L-80 Liner Jd 11770'
I 4-1/2" TBG,12.6#, L-80, .0152 bpf, ID= 3.958"
11810'
11812'
11721'
11723'
11778'
11799'
I 11799'
11810'
IdRIGHT HAND RELEASE LATCH I
Id 7-5/8" x 4-1/2" TIVV HBBP PKR, ID= 4.0"
Id4'1/2" PKR SWS NIP, ID= 3.813" I
Id4-1/2" PKR SWN NIP, ID= 3.725" I
Id ELMD 03/04/91 I
]--15-1/2" T~N DUMMY SEAL ASSY W/O SF_.ALS I
7-5/8" CSG, 29.7#, NT-95HS, ID = 6.875" Id 12072' ~
I Mill Window off Flow-by Whipstock I~[ 12205'
PERFORATION SUMMARY
REF LOG: ATLAS BHCA, 1/18/91
ANGLE AT TOP PERF: 143 @ 12202' I
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 12202-12234 O 5/12/1991
3-3/8" 4 12246-12272 O 4/5/1991
3-3/8" 4 12272-12292 O 3/30/1991
3-3/8" 4 12305-12320 C 11/29/1991
3-3/8" 4 12330-12338 C 11/29/1991
13-3/8" IBPSet 11/29/1991 Id
I-I
I 5-1/2" LNR, 17#, 13Cr, .0232 bpf, ID = 4.892" Id
12298' t--
12456' I
12577' ~
I
12420'
DATE REV BY COMMENTS
01/23/91 DFF ORIGINAL COMPLETION
03/04/01 SlS-SLT CONVERTEDTO CANVAS
03/08/01 SlS-LG FINAL
05/15/01 RN/tlh CORRECTIONS
05/30/01 pcr P-15L1 proposed CTD completion
12265' I~ 3-1/2"X 2-7/8" XO I
0 0 0 0 0 0 0 0 0 0
Top of FillI
I 3-1/2"x 2-7/8" Pre-drilled Liner Id 13275'
PRUDHOE BAY UNIT
WELL: P-15L1
PERMIT No: 90-1760
APl No: 50-029-22120-60
Sec. 31, T10N, R13E
BP Exploration (Alas ka)
TREE= 4-1/16" 5M CIVV
WELLFEAD= 5M FMC
a CTUATOR= OTIS
KB. ELEV = 91.91'
BF. F_LEV = 54.04'
KOP = 3200'
Max Angle = 58 (~ 8881'
Datum MD = 12112'
Datum TVDss= 8800'
10-3/4"CSG, 45.5~, L-80, ID= 9.953" H 2702'
Minimum ID = 3.725" @ 11799'
4-1/2 PKR SWN NIP
ITOPOF 5-1/2" TIWLNR H
11810'
11812'
I7-5/8,' CSG' 29'7#' NT'95HS' ID = 6'875'' H 12072' I
FERFORATION SUMMARY
REF LOG: ATLAS BHCA, 1/18/91
ANGLE AT TOP PERF: 143@12207
Note: Refer to Production DB for historical perf data
SEE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 12202-12234 O 5/12/1991
3-3/8" 4 12246-12272 O 4/5/1991
3-3/8" 4 12272-12292 O 3/30/1991
3-3/8" 4 12305-12320 C 11/29/1991
3-3/8" 4 12330-12338 C 11/29/1991
P-15
SAFETY NOTES
2078' ~--~4-1/2"OTISSSSVNIP, ID= 3.813"
GAS LIFT MANDRELS
11714' I-~4-1/2" PKR SWS NIP, ID: 3.813" I
11721'
11723'
11778'
11799'
11799'
11810'
I--JR~GHT HA ND RELEA SE LATCH I
H7-$/8" x 4-1/2"TIVV HBBPPKR, ID= 4.0" I
4-1/2" PKRSWNNP, ID=3.725" I
ELMD 03/04/91 I
H5-1/Z' T]W DUMMY SEAL ASSY W/O SEALS I
L
12420' J'-~RSH- CTU- FN/CRV/CV/NZL, 22"x 2-1/2"05/27/91
I PBTD H 12456'
I5-1/2" LNR, 17#, 13Cr, .0232 bpf, ID= 4.892"
12577'
DATE REV BY COMIVENTS
01/23/91 DFF ORIGINAL COIVPLETION
03/04/01 SIS-SLT CONVERTEDTOCANVAS
03/08/01 SIS-LG FINAL
05/1 5/01 RN/tlh CORRECTIONS
FRUDHOE BAY UNIT
WELL: P-15
PERMIT No: 90-1760
APINo: 50-029-22120-00
Sec. 31, T10N, R13E
BP Exploration (Alas ka)
BP Amoco
Co-ordinate (N/E) Reference: Well Centre: P-15, True North
Vertical ('[VD) Reference: Systeru: Mean Sea Level
Section {rS) Reference: S,~t - 15 (0.00N.0.00E)
Measured Depth Reference: 23:15 1/1/1991 00:00 91.91
Calculation Method: Minimum Curvature
SEG'nON D ETAILJ
Sic MD ln¢ AZl TV~ +K +E/-W DI~I TFace VS4¢ T g
I 12.1~.59 4a.42 15o.~9 8862.09 ..,.a3o. K 4673.48 o. oo o.oo 48~.Gs
2 122o5.o0 42.¶o 15o~4.5 8864.0~ -4~34.13 4~75~17 6162 2G8.~ 4834.13
3
4 'l~.O0 sO.00 30.00 C~0~ 4~'.38
S 12788.00 91.34 t97-43 8926.33 -5365..43 4~D7A1 10.00 8~*00 S365.43
1~O3~.00 9~L17 167-t6 8914.14 -~61~15 ~7.~6silO0 277.00 5613.15
? 13275.00 96.23 151~? 881~.~ -S~ S~47.44
ANNOTATIONS
Ilii~o 1z205.00
117331 t2215.~
812633 12718.~
IIIZ3i t3275.~ ~
8350
8400
8450
8500
Obp
LEGEND
........ P-15 (P-15)
-- Plar~ P-15A
........ Plan #5
T
Azimuths to True North
Magnetic North: 26.42°
Magnetic Field
Strength: 57476nT
Dip Angle: 80.74°
Date: 8/2/2001
Model: BGGM2001
Plan:-plan- #5 (P-15/Plan#5 P-ISA}-
Created By:. Bdj PolnisDate: 81212001
Cor~tac-t !r:folm~tior~.
['),!~:.¢,L {907) 267-66 :, 3
E .mai!: brij.po1~is;(¢in-leq
Baker Hu.qil(~S INTEQ: (907)
.4600 .....
-4700 -
· .4800 ]
-4900 -
-5000
.-- -5100
O -5200
0 .
-5300":
4'
.~-5400 :
0 -5500"'~
~-5600 :'
· ,~ .
~ -5700· -i
.
-5800 ~ -
]
-5900 '
.
-6000 -- ' '
.
: -6100 ;
8550 % -. :. .
g 8600 ' ' :. '
8650 : ' 3300 3400 3500 36'00 3700 38:00 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 5000 5100 5200 5300 5400 5500 5600 5700 5800 5900
8700 . . West(-)/East(+) [lOOft/in]
8750 · % .
~8800 : %' ·
85 : X
~8 0.
......... ~ ...................... ~',~ .............................. Plar~L5 P-15A~/ '~--', P-15A T5.2;
.
~' P-15A T5.1;
8950
9000
9050
9100 ........ : ............. ~.~ ................... - ............. ..................
4550 4600 4650 4700 4750 4800 4850 4900 4950 5000 5050 5100 5150 5200 5250 5300 5350 5400 5450 5500 5550 5600 5650 5700 5750 5800 5850 5900 5950 6000 6050 6100 6150 6200 6250 6300 6350 6400 6450
Vertical Section at 180.00° [5Oft/in]
· 8/2/2001 2:54 PM
ObP BP Amoco
Baker Hughes INTEQ Planning Report /~::i:ii:~ ..........................
Company: BP Amoco Date: 8/2/2001 Time: 14:52:51 Page: 1
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: P-15, True North
Site: PB P Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: P-15 Section (VS) Reference: Well (0.00N,0.00E, 180.00Azi)
Wellpath: Plang5 P-15A Survey Calculation Method: Minimum Curvature Db: Oracle
:"='"=="'--"=:='-":==-:':'= ~: =--'-":'"::':'":'-'==' :c::=":::':='-::==:
Field: Prudhoe Bay
North Slope
UN ITED STATE8
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: BGGM2001
Site: PB P Pad
TR-11-13
UNITED STATES · North Slope
Site Position: Northing: 5949377.17 ft Latitude: 70 16 12.612 N
From: Map Easting: 623154.06 ft Longitude: 149 0 14.402 W
Position Uncertainty: 0.00 ff North Reference: True
. .Gr.°u..n-d._Lev~el:- _°-°°....ft G~r!d~_C~nve~ge_.n_~e_:. °~'94 deg
Well: P-15 Slot Name: 15
P-15
Well Position: +N/-S-2345.54 ft Northing: 5947166.74 ft Latitude: 70 15 49.500 N
+E/-W 8227.11 ft Easting: 631417.77 ft Longitude: 148 56 14.980 W
Position Uncertainty: 0.00 ft
Wellpath: Plan#5 P-15A Drilled From: P-15
500292212001 Tie-on Depth: 12205.00 ft
Current Datum: 23 · 15 1/1/1991 00:00 Height 91.91 ft Above System Datum: Mean Sea Level
Magnetic Data: 8/2/2001 Declination: 26.42 de9
Field Strength: 57476 nT Mag Dip Angle: 80.74 de9
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
0.00 0.00 0.00 180.00
Plan: Plan #5 Date Composed: 8/2/2001
Identical to Lamar's Plan #5 Version: 1
Principal: Yes Tied-to: From: Definitive Path
Targets
.... '== ................... '= ........................................................................................... : ...................................................... : .............. '. ...................... i ................. :" Map .Map <--- Latitude ---> <-- Longitude
Name Description TVD +N/:S +E/-W Northing 'Easting Deg Min Sec Deg Min Sec
· ft · ft ft'.. ff.. ft
P-15A T5.1 8930.00 -5509.06 4794.08 5941742.64 636306.88 70 14 55.304 N 148 53 55.566 W
P-15AT5.2 8891.00 -5857.88 4777.75 5941393.61 636296.64 70 14 51.873 N 148 53 56.048 W
Annotation
MD TVD
ft ft
' 12'~'99'.59 ' 8862.09 .... TiP ..................................................
12205.00 8866.09 KOP
12215.00 8873.39 1
12368.00 8931.47 2
12788.00 8926.33 3
13038.00 8914.13 4
13275.00 8892.36 TD
Plan Section Information
MD Incl Azim TVD
ft deg deg ft
12199.59 42.42 150.69 88'62.09
12205.00 42.10 150.45 8866.09
12215.00 44.10 150.45 8873.39
12368.00 90.00 150.45 8931.47
12788.00 91.34 192.43 8926.33
13038.00 94.17 167.56 8914.14
13275.00 96.23 191.27 8892.36
;: +N/'S +E/-W DLS Build Turn TFO Target
ft ft deg/100ft deg/100ft deg/100ft deg
-4830.96 4673.48 0.00 0.00 0.00 0.00
-4834.13 4675.27 6.62 -5.91 -4.44 206.68
-4840.07 4678.64 20.00 20.00 0.00 0.00
-4959.38 4746.28 30.00 30.00 0.00 0.00
-5365.43 4807.41 10.00 0.32 10.00 88.00
-5613.15 4807.36 10.00 1.13 -9.95 277.00
-5847.44 4809.83 10.00 0.87 10.00 84.00
BP Amoco
bp
Baker Hughes INTEQ Planning Report i~'~:i:'~i~ .............................
Company: BP Amoco Date: 8/2/2001 Time: 14:52:51 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: P-15, True North
Site: PB P Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: P-15 Section (VS) Reference: Well (0.00N,0.00E,180.00Azi)
._w~e_~_??.!~,L .._..P,.!a_~ ~5 P-_1_5_ _A. ....................................................................................................................... S. U..~,e.y,,. ,C.~!_C.U,!..a.t.!_on_.M__e,~h_0_d_~ ............ ,M.!.r~im_? ~...~,u.~.a,~ r_? ....................... ~_b,!,._.,.??.c_!~ ............
Survey
MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ft deg deg ft ft ft ft ft deg/100ft ft deg
12199.59 42.42 150.69 8862.09 -4830.96 4673.48 5942418.48 636174.47 0.00 4830.96 0.00 TIP
12200.00 42.42 150.69 8862.39 -4831.20 4673.62 5942418.24 636174.61 0.00 4831.20 0.00 MWD
12205.00 42.10 150.45 8866.09 -4834.13 4675.27 5942415.34 636176.32 7.17 4834.13 206.68 KOP
12215.00 44.10 150.45 8873.39 -4840.07 4678.64 5942409.46 636179.79 20.00 4840.07 0.00 1
12225.00 47.10 150.45 8880.39 -4846.28 4682.16 5942403.31 636183.42 30.00 4846.28 0.00 MWD
12241.37 52,01 150.45 8891.00 -4857.12 4688.30 5942392.58 636189.75 30.00 4857.12 0.00 P-15A
12250.00 54.60 150.45 8896.16 -4863.14 4691.72 5942386.62 636193.27 30.00 4863.14 360.00 MWD
12275.00 62.10 150.45 8909.27 -4881.64 4702.21 5942368.31 636204.08 30.00 4881.64 0.00 MWD
12300.00 69.60 150.45 8919.49 -4901.47 4713.45 5942348.68 636215.66 30.00 4901.47 360.00 MWD
12325,00 77.10 150.45 8926.65 -4922.29 4725.25 5942328.07 636227.83 30.00 4922.29 360.00 MWD
12350.00 84.60 150.45 8930.62 -4943.75 4737.42 5942306.83 636240.36 30.00 4943.75 0.00 MWD
12368.00 90.00 150.45 8931.47 -4959.38 4746.28 5942291.36 636249.50 30.00 4959.38 0.00 2
12375.00 90.02 151.15 8931.47 -4965.49 4749.70 5942285.31 636253.02 10.00 4965.49 88.00 MWD
12400.00 90.11 153.65 8931.44 -4987.64 4761.28 5942263.36 636264.98 10.00 4987.64 88.00 MWD
12425.00 90.20 156.15 8931.37 -5010.28 4771.88 5942240.91 636275.98 10.00 5010.28 88.00 MWD
12450.00 90.29 158.65 8931.27 -5033.36 4781.49 5942218.01 636285.99 10.00 5033.36 88.01 MWD
12475.00 90.37 161.14 8931.12 -5056.83 4790.08 5942194.69 636294.99 10.00 5056.83 88,02 MWD
12500.00 90.46 163.64 8930.94 -5080.66 4797.64 5942171.00 636302.97 10.00 5080.66 88.03 MWD
12525.00 90.54 166.14 8930.72 -5104.79 4804.16 5942146.99 636309.90 10.00 5104.79 88.05 MWD
12550.00 90.62 168.64 8930.47 -5129.19 4809.62 5942122.70 636315.78 10.00 5129.19 88.07 MWD
12575.00 90.71 171.14 8930.18 -5153.79 4814.01 5942098.17 636320.60 10.00 5153.79 88.10 MWD
12600.00 90.79 173.64 8929.85 -5178.57 4817.32 5942073.46 636324.34 10.00 5178.57 88.13 MWD
12625.00 90.87 176.14 8929.49 -5203.46 4819.54 5942048.61 636327.01 10.00 5203.47 88.16 MWD
12650.00 90.94 178.64 8929.10 -5228.43 4820.68 5942023.66 636328.58 10.00 5228.43 88.20 MWD
12675.00 91.02 181.13 8928.67 -5253.43 4820.73 5941998.68 636329.07 10.00 5253,43 88.24 MWD
12700.00 91.09 183.63 8928.21 -5278.40 4819.69 5941973.69 636328.46 10.00 5278.40 88.28 MWD
12725.00 91.17 186.13 8927.71 -5303.30 4817.57 5941948.76 636326.77 10.00 5303.30 88.33 MWD
12750.00 91.24 188.63 8927.19 -5328.09 4814.36 5941923.92 636323.99 10.00 5328.09 88.38 MWD
12775.00 91.31 191.13 8926.63 -5352.71 4810.07 5941899.23 636320.13 9.99 5352.71 88.40 MWD
12788.00 91.34 192.43 8926.33 -5365.43 4807.41 5941886.47 636317.70 9.99 5365.43 88.45 3
12800.00 91.49 191.24 8926.03 -5377.17 4804.95 5941874.69 636315.45 10.00 5377.17 277.00 MWD
12825.00 91.79 188.76 8925.32 -5401.78 4800.61 5941850.01 636311.54 10.00 5401.78 276.97 MWD
12850.00 92.09 186.27 8924.47 -5426.55 4797.34 5941825.19 636308.70 10.00 5426.55 276.90 MWD
12875.00 92.38 183.79 8923.50 -5451.43 4795.15 5941800.27 636306.95 10.00 5451.43 276.82 MWD
12900.00 92.67 181.30 8922.40 -5476.38 4794.05 5941775.31 636306.28 10.00 5476.38 276.72 MWD
12925.00 92.96 178.82 8921.17 -5501.35 4794.02 5941750.35 636306.69 10.00 5501.35 276.61 MWD
12950.00 93.24 176.33 8919.82 -5526.29 4795.08 5941725.43 636308.18 10.00 5526.29 276.49 MWD
12975.00 93.51 173.84 8918.35 -5551.15 4797.22 5941700.61 636310.75 10.00 5551.15 276.35 MVVD
13000.00 93.78 171.35 8916.76 -5575.89 4800.43 5941675.94 636314.40 10.00 5575.89 276.21 MWD
13025.00 94.04 168.86 8915.06 -5600.46 4804.72 5941651.45 636319.11 10.00 5600.46 276.08 MWD
13038.00 94.17 167.56 8914.14 -5613.15 4807.36 5941638.80 636321.97 10.00 5613.15 275.91 4
13050.00 94.29 168.76 8913.25 -5624.86 4809.82 5941627.14 636324.63 10.00 5624.86 84.00 MWD
13075.00 94.55 171.25 8911.33 -5649.41 4814.14 5941602.67 636329.39 10.00 5649.41 84.09 MWD
13100.00 94.79 173.75 8909.29 -5674.11 4817.39 5941578.03 636333.07 10.00 5674.11 84.28 MWD
13125.00 95.03 176.25 8907.15 -5698.92 4819.57 5941553.27 636335.68 10.00 5698.92 84.48 MWD
13150.00 95.25 178.75 8904.91 -5723.79 4820.65 5941528.42 636337.20 10.00 5723.79 84.70 MWD
13175.00 95.47 181.25 8902.57 -5748.68 4820.66 5941503.54 636337.63 10.00 5748.68 84.92 MWD
13200.00 95.68 183.75 8900.14 -5773.54 4819.57 5941478.67 636336.98 10.00 5773.54 85.16 MWD
13225.00 95.87 186.26 8897.63 -5798.32 4817.40 5941453.86 636335.25 10.00 5798.32 85.40 MWD
13250.00 96.06 188.76 8895.03 -5822.96 4814.15 5941429.16 636332.43 10.00 5822.96 85.65 MWD
13275.00 96.23 191.27 8892.36 -5847.44 4809.83 5941404.61 636328.53 10.00 5847.44 85.87 TD
CDR1
Drilling Wellhead ~ .,tail
16
19.30'
21.10'
._.:' r..
Rig Floor
5.59'
~0'~
Shaffer Dual
T.O.T. 5,000 psi W.P.
R_a__~_ Type Dual Gate mOPE
~ CT Injector Head
Otis Q.C. thread half
Traveling plate
5-1/2" lubricator
Jacking Frame
4..~Top Stationary Plate
Annular BOP
(Hydril),7-1/16" ID
Annular BOP
(Hydril),7-1/16" ID
Top blind / shearI
2-7/8" - 3.5" Variable bore
rams
Kill Line
I Top 2 3/8" pipe / slipsI
I Btm 2 7/8" pipe / slips
Manual Master Valve
~ Tubing Hanger
9-5/8" Annulus
0.66'
Rig Matt
Ground Level
13-3/8" Annulus
H19 710
DATE 1 CHECK NO.
07/31/01 00194710
VENDOR ALASKAO I LA OO
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
072701 CK072701A 100. O0 100. O0
PYMT (;OMMENTS: Peea~it To Drill F'ee
HANDL]:N~ INST: S/H - Teeeie Hub~ le X4&28
,. ,
HE ATrACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. ~ll[O]f!l=m ~ 1OO. CO 1OO. CO
BP EXPLORATION, (ALASKA)INC.
RO. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK 'OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
NO.:H ~94710
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
412 CO 194710
PAY
ONE HUNDRED & ***************************** ~**~*********** US D~LLAR
To The
ORDER
0~
NOIWALi D
Sm'- 00~
TRANSMITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
CHECK 1 CHECK WHAT APPLIES
STANDARD LETTER "CLUE"
DEVELOPMENT
DEVELOPMENT
REDRILL
EXPLORATION
INJECTION WELL
INJECTION WELL
REDRILL
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last' two (2)
digits are between 60-69)
PILOT HOLE (PH)
ANNULARD}~OSAL(\ NO
ANNULAR DISPOSAL
( ) yES
ANNULAR DISPOSAL
THIS WELL
DISPOSAL INTO OTHER
ANNULUS
( , )YES+
The permit is for a new wellbore segment of existing well
Production should continue to be reported as a function of
the original APl number stated above.
In accordance with 20 AAC 25.005(0, all records, data and
logs acquired for the' pilot hole must be clearly
differentiated in both name (name on permit plus PI-I)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested...
Annular Disposa! of drilling wastes will not be approved...
:
Annular Disposal of drilling wastes will not be approved...
Please note that an disposal of fluids generated...
SPACING EXCEPTION
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved, s~bject to
full compliance with 20 AAC 25.055.' Approval to perforate
and produce is contingent upon issuance of a conserVation
order approving a spacing exception.
(Comoan¥ Name) will assume the liability of any protest to
the spacing exception that may occur.
Templates are located m drive\jody\templates
WELL PERMIT CHECKLIST COMPANY ,~,~,P~ WELL NAME.~-'//,~Z / 'PROGRAM: exp der '~' red,l_ serv wellbore seg ~' ann. disposal para req
- ·
· ,,
FIELD & POOL ~'~..)/,.~,.-) INIT CLASS x~ /..<:3~'/ GEOL AREA
ADMINISTRATION 1. Permit fee attached ....................... ~ N
2. Lease number appropriate ................... Y N
3. Unique well name and number ..................Y N
4. Well located in a defined pool ................... Y N
5. Well located proper distance from drilling unil boundary .... Y N
6. Well located proper distance from other wells .......... Y N
7. Suflident acreage available-in drilling unit ............ Y N
8. If deviated, is wellbore plat included ............. ·.. Y N
9. Operator only affected party ................... Y N ..
10. Operator has appropriate bond in force ............. Y N
11. Permit can be issued without conservation order ........ Y N
~_~ _D/ATE~/ 12. Permit can.be issued without administrative approval ...... I Y N
13. Can permit be approved before 15-day wait. ~ N
~ i~ ' · · · , ~ · . . ·
15. Sudace casing protects all known USOWs.... ........ .
16. CMT vol adequate to circulate on conductor & surf csg ..... ~c.~-~.~--~, o-~ e..~.'~%~\~ ~--~'1
17. CMT vol adequate to tie-in long string to surf csg. ' Y N~" '" ,._ ~ . c-,,, .. '
18. CMT will cover all known productive horizons. "' '¥
19. Casing' designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. Ifare-drill. hasa lO-403 for abandonment been approved. . . ~N
22. Adequate weilbore separation proposed.
23. If diverter required, does it meet regulations .......... ;'
' 24. Drilling .fluid program schematic & equip list adequate .....
,T 25. BOPEs. do they meet regulation ............. ~ . . (,._Y.) N . ,,. . ~ '
. A'E 26. BOPE press rating appropriate; test to ~ psig. (~N
27. Choke manifold complies w/APl RP-53 (May 84) ..... '
28. Work will occur without operation shutdown ........... Y~ N . · '
29. Is presence of H2S gas probable ................. Y
~;EOLOGY 30. Permit can be issued ~1o hydrogen' sulfide measures ...... Y N
31 ' Data presented on potential overpressure zones ....... Y ,J~ ~,/~/ '
32. Seismic analysis of shallow gas zones ............ . . ~ N ?c,,' ~ ~, . .
&~'~~ A~P~ _.~A_TF.//~ 33. Seabed condition survey (if off-shore) ............. /~ N ' · .
, 34. Contact name/phone for weekly progress reports [exploratory only] Y N. ' . .
ANNULAR DISPOSAL35. With proper cementing records, thi~ plan ' '
(A) will contain waste in a suitable receiving zonei ..... ~.. Y N
APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N
to surface;
(C) will not impair mechanical integritY of the Well used for diSposal; Y' N
(D) will not damage producing formation or impair recovery from a Y N
pool; and "
... (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. .. Y N
ENGINEERING:.. ' U!Cl.Annular COMMISSIO. N: Comments/Instructions:
O
'Z
O
-4
c:Vnsoffice\wordian~ian';~checklist (rev. 111011100)