Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-1867. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU E-102
Install Cemented Scab Liner w CT
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
201-186
50-029-23042-00-00
10315
Conductor
Surface
Intermediate
Production
Scab Liner
8321
80
4372
10275
360
10159
20"
10-3/4"
7-5/8"
3-1/2"
8186
36 - 116
35 - 4407
32 - 10307
9830 - 10190
36 - 116
35 - 3773
32 - 8314
7902 - 8213
None
470
2480
4790
10530
None
1490
5210
6890
10160
10006 - 10112
5-1/2" 17# x 4-1/2" 12.6# L80 29 - 9849
8053 - 8145
Structural
4-1/2" Baker S3 Packer 9791, 7869
9791
7869
Stan Golis
Sr. Area Operations Manager
Kirsty Glasheen
Kirsty.Glasheen@hilcorp.com
907.564.5258
PRUDHOE BAY, MIDNIGHT SUN OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028299, 0028304
29 - 7918
Production Casing x Scab Liner annulus from 10070 - 10190' MD
Pump/Squeeze 40-bbls 15.8-ppg Class G cement. Final treating pressure = 1470-psi.
339
62
3471
3935
10447
3046
1205
1807
347
206
322-470
13b. Pools active after work:Midnight Sun Oil
No SSSV Installed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
the best of my knowled
February 2, 2023
By Meredith Guhl at 9:22 am, Feb 02, 2023
RBDMS JSB 020723
322-470
WCB 12-6-2024
Sundry Number
PBU E-102
Perforate
il d biCoiled Tubing Ops
Plug Perforations
PRUDHOE BAY, MIDNIGHT SUN OIL
Install Cemented Scab Liner w CT
201-186
DSR-2/2/23
ACTIVITY DATE SUMMARY
8/30/2022
***WELL S/I ON ARRIVAL***
PULLED 4-1/2" IBP STOP FROM X-NIP @ 9,771' MD
RAN 18' x 2.50" PUMP BAILER W/ IBP EQ SLV BTM TO IBP @ 10,121' SLM (no
recovery)
***CONTINUE ON 8-31-22 WSR***
8/31/2022
***CONTINUE ON FROM 8-30-22 WSR***
RAN 3.70" IBP EQ SLEEVE, SD @ 10,124' SLM. NO DEPTH GAIN OR PRESSURE
CHANGE.
RAN 3' x 1-3/4" STEM, 3.69" CENT, 3.50" LIB, SD & TAG IBP @ 10,120' SLM. NO
MARKS ON LIB
RAN KJ, BOWSPRING CENT, 3.70" EQ SLEEVE, SD ON IBP @10,123' SLM. NO
DEPTH GAIN OR PRESSURE CHANGE
RAN 3.75" CENT, 2.5" SAMPLE BLR. SD @10,118' SLM. NO DEPTH GAIN.
RECOVERED ABOUT 1 CUP OF SAND
RAN 10' x 2-1/2" PUMP BLR W/ 2.5" CENT BETWEEN WORKING & RECOVERY
BARREL, & BLR BTM 2 FROM WLB. SD @10,119' SLM. RECOVERED 1.5
GALLONS OF SAND
RAN 10' x 3" PUMP BAILER TWICE TO IBP @ 10,121' SLM (recovered approx 3/4
of a gal of formation sand)
***CONTINUE ON 9-1-22 WSR***
9/1/2022
***CONTINUE ON FROM 8-31-22 WSR***
MADE 2 BAILER RUNS W/ 10' x 3" PUMP BAILER DOWN TO 10,125' SLM &
RECOVERED APPROX 3 GAL OF FORMATION SAND(new metal marks on blr
btm)
RAN 3.70" IBP EQ SLV, SD @ 10,125' SLM & JAR DOWN FOR 10min. 1 MARK ON
OUTER EDGE OF SLEEVE. PINS UNTOUCHED
RAN BOWSPRING CENT, 3.70" IBP EQ SLEEVE, SD @10,127' SLM. NO MARKS,
PINS UNTOUCHED
RAN 10' x 3" PUMP BLR W/ FLAT BTM BALL, SD @10,127' SLM, RECOVERED
APPROX 1 CUP OF SAND
RAN 10' x 2-1/2" PUMP BLR, MULE SHOE BALL BTM, SD @10,125' SLM,
RECOVERED APPROX 1 GALLON OF SAND
RAN 10' x 3" PUMP BLR, MULE SHOE BALL BTM, SD @10,124' SLM, BLR EMPTY
RAN KJ, 3.70" IBP EQ SLV TO 10,121' SLM (tattle tail pins untouched but alot of new
metal marks on btm)
RAN 5' x 1-3/4" DRIVE DOWN BAILER TO 10,122' SLM (no returns)
***CONTINUE ON 9-2-22 WSR***
Daily Report of Well Operations
PBU E-102
PULLED 4-1/2" IBP STOP FROM X-NIP @ 9,771' MD
Daily Report of Well Operations
PBU E-102
9/2/2022
***CONTINUE ON FROM 9-1-22 WSR***
RAN KJ, 3.70" IBP EQ SLV TO IBP @ 10,125' SLM (no signs of equalization, tattle
tail pins not touched)
RAN 3' x 2-1/8" STEM, KJ, BOW SRING, XO, 3.50" TO 10,122' SLM (very small
mark on edge of lib)
RAN 3.50" DE-CENT, CLOCK, SHEARABLE KJ, 3.55" BELL GUIDE, 4" ext, 2" JUS
(w/ 2.30" bell skirt). SD @10,126' SLM, 1 MARK ON BTM OF BELLGUIDE @2:00,
PIN IN KJ & JUS UNTOUCHED
RAN 3.50" DE-CENT, CLOCK, SHEARABLE KJ, 3.55" BELL GUIDE, 4" ext, 2" JUS
(w/ 2.30" bell skirt) SD @10,125' SLM, KJ IS SHEARED, MARKS ON BELLGUIDE
BTM & SKIRT OF JUS @10:00
RAN 3.50" DE-CENT, CLOCK, SHEARABLE KJ, 3.55" BELL GUIDE, 4" ext, 2" JUS
(w/ 2.30" bell skirt) SD @10,077' SLM, WORK DOWN, SD @10,126' SLM. MARKS
ON JUS SKIRT @6:00
RAN KJ, 3.55" BELLGUIDE, 4" EXT, 2" JUS (w/ 2.30" bell skirt), SD @10,126' SLM.
MARKS ON OUTER EDGE OF BELLGUIDE & ON SKIRT OF JUS
***WELL S/I ON DEPARTURE***
9/28/2022
***WELL S/I ON ARRIVAL*** (scab liner)
RAN 3.70" LIB ON DECENTRALIZER TO IBP @ 10082' SLM (pic of fn laying @ 7:30
position)
RAN 3.60" BELL GUIDE & 2" JUS w/ 2.30" BELL SKIRT TO IBP @ 10082' SLM
(metal marks on inside of bell guide & tip of bell skirt, unable to latch)
RAN 10' x 3" P-BAILER TO IBP @ 10082' SLM (no recovery)
LATCHED IBP w/ 2.34" SWAGE,KJ,2" JUS w/ 2.30" BELLSKIRT.
RAN 2.34" SWAGE,KJ,2" DOGLESS JDC w/ 2.30" BELLSKIRT (Unable to shear
steel pin)
LATCHED IBP w/ 4 1/2" BAITSUB,KJ,KJ,2" JDC w/ 2.30" BELLSKIRT.
***JOB IN PROGRESS, CONTINUED ON 9/29/22 WSR***
9/29/2022
***CONTINUED FROM 9/29/22 WSR*** (Scab liner)
PULLED IBP FISH @ 10110' MD (bag intact, missing element)
LOGGED RCH 48 ARM CALIPER f/ 10084' SLM TO SURFACE
SET 4-1/2" WHIDDON ON XN NIP AT 9,836' MD
PULLED BK-OGLV FROM STA# 1 AT 4,696' MD
***CONT ON 9/30/22 WSR***
9/29/2022
T/I/O= 750/1250/100 TEMP= SI (SCAB LINER) Assist Sline as directed.
Pumped 86 bbls crude down IA for load job in progress ***Job cont to 9-30-22
WSR***
9/30/2022
***Job cont from 9-29-22 WSR*** Pumped the remaining 7 bbls crude down IA for
load. Pumped .5 of a bbls to achieve test pressure of 1000 psi . 1st 15 min= IA lost
40 psi // 2nd 15 min= IA lost 10 psi. Bled ~ .9 bbl . Sline in control of well upon
departure. Pad Op. notified of well status. CV's= OTG TAGS HUNG FWHP's=
900/250/125
9/30/2022
***CONT FROM 9/29/22 WSR*** (scab liner)
T-BIRD LOADED IA w/ 93 BBLS CRUDE
SET BK-DGLV IN STA# 1 AT 4,696' MD
PULL 4-1/2" WHIDDON FROM 9,836' MD (empty)
T-BIRD PERFORMED PASSING MIT-IA TO 1,200 psi
RAN UPPER 45 KB PKR DRIFT (representing ORCA scab liner) & S. BAILER TO
10,086' SLM (no sample)
***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED***
()
PULLED IBP FISH @ 10110' MD (bag intact, missing element)
Daily Report of Well Operations
PBU E-102
12/4/2022
LRS CTU #2 - 2.0" Coil
Job Objective: FCO, Log, Scab Liner, Cement Scab Liner.
MIRU LRS CTU # 2. M/U HES GR/CCL Logging BHA in 2.875" carrier w/3.60" DJN.
Stab on wellhead and N/U BOP stack.
...Job In Progress.....
12/5/2022
LRS CTU #2 - 2.0" Coil
Job Objective: FCO, Log, Scab Liner, Cement Scab Liner.
RIH HES GR/CCL Logging BHA in 2.875" carrier w/3.60" DJN. Bullhead 350 bbls of
KCI down CTBS while RIH. Tagged fill at 10,115¿ CTM. Begin Fluff N Stuff. Cleanout
down to 10,138' CTM, unable to make any hole. PUH to tubing tail and bullhead liner
volume down CTBS. Dry tagged 10,139' CTM. Logged from 10,139' in compression
to 9,699' CTM, flag pipe. Pooh and monitor well kill. Determine KWF will be 8.8 ppg.
Tie in to XN and tubing tail, corrected TD tag of 10129' MD (10139' MD vs.
Liner/perfs). Make up 3-5/8" DB Underreamer and 3.70" PDC mill and RIH to mill
consolidated fill/sand. At flag, correct counter to bottom of mill and RIH. Tagged up
10,128' MD / 10,135' (M). Establish 1:1 returns and cleanout w/gel sweeps down to
PBTD 10,190' MD / 10,197' (M). Drop 3/4" circ ball and pumped 16 bbls final gel
sweep on bottom. Gel @ BHA, Pooh w/BHA pumping. Repaint flag while Pooh,
Corrected EOP = 9,677.04'.
...Job In Progress.....
12/6/2022
LRS CTU #2 - 2.0" Coil
Job Objective: FCO, Log, Scab Liner, Cement Scab Liner.
Continue Pooh w/BOT milling BHA. FP coil w/60 bbls diesel, put 5 bbl diesel cap on
well. Bullhead 350 bbls of KWF down tubing @ 5 bpm. Flow check. Maintain well
control by circulating across the top with 0.7-0.8 bpm losses. Deploy Scab Liner and
RIH. Tie-in at flag and swedge into XN nipple, top of deployment sleeve at 9830' MD,
PBTD inside the liner of 10158' MD tied in tot the tubing tally. PT seals to 500 psi.
POOH. Completed weekly BOP testing to 300 psi low / 4250 psi high. M/U BOPs to
wellhead. M/U NS cement stinger BHA.
...Job In Progress.....
12/7/2022
LRS CTU #2 - 2.0" Coil
Job Objective: FCO, Log, Scab Liner, Cement Scab Liner.
M/U NS cement stinger BHA and RIH. Sting into NS Orca valve pumping .5 bpm, Circ
1000 psi, good indication of stinger seating and rupture disc shearing at 3200 psi.
Displace CTBS w/diesel for cement squeeze. Circulate 12 bbls of 15.8ppg class G
cement thru sleeve at 9856', close choke and squeeze 28 bbls behind pipe. Unable to
obtain squeeze pressure. Unsting from ORCA and PUH to shift sleeve closed. No
good indication sleeve shifted closed. Conataminate with 37 bbls of PowerVis and
chase oouh at 80%. Well went on 0.5 bpm losses while cleaning out. Lay in diesel
from 2400' TVD.. OOH with ORCA cementing BHA and all looks normal, discuss
losses with OE and decision to rig down and evaluate with CBL. Estimated TOC at
9856 MD. Stab on with side jet nozzle and jet BOPs. RDMO.
...Job Complete...
12/23/2022
T/I/O = 480/0+/100. Temp = SI. T FL (SL req). ALP = 0 psi, AL SI @ CV & LV. T
FL @ surface.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 09:30
LRS CTU #2 - 2.0" Coil
Job Objective: FCO, Log, Scab Liner, Cement Scab Liner.
Deploy Scab Liner andygy
RIH. Tie-in at flag and swedge into XN nipple, top of deployment sleeve at 9830' MD, g g
PBTD inside the liner of 10158' MD
jg
M/U NS cement stinger BHA and RIH. Sting into NS Orca valve pumping .5 bpm, Circggg
1000 psi, good indication of stinger seating and rupture disc shearing at 3200 psi.gggg
Displace CTBS w/diesel for cement squeeze. Circulate 12 bbls of 15.8ppg class Gg
cement thru sleeve at 9856', close choke and squeeze 28 bbls behind pipe. Unable to
obtain squeeze pressure.
Daily Report of Well Operations
PBU E-102
1/1/2023
***WELL S/I ON ARRIVAL***
RIH W/ 30' X 2.66'' DMY GUNS, S/D & TAG BOTTOM @ 10,175' SLM (10,159' MD)
(ORCA CEMENT VALVE)
RAN READ RBT/GR/CCL MEMORY TOOL (24.5' OAL) LOG @ 30 FPM FROM
10,165' SLM TO 9685' SLM FOR 2 PASSES.
***CONTINUE ON 1/2/2023***
1/2/2023
***CONTINUE FROM 1/1/2023***
RAN 3-1/2" D&D HOLEFINDER AND CONFIRM SSD @ 9,856' MD IS OPEN
SHIFTED SSD CLOSED @ 9,856'MD
PERFORMED PASSING TEST PRESSURE TEST TO 2500PSI ON TBG
SHIFTED SSD OPEN @ 9,856'MD
***WELL LEFT S/I ON DEPARTURE***
(Note: cbl data indicated TOC at 10,070', coil to come back and cement through ssd)
1/2/2023 T/I/O=270/0/0 Assist Slickline ( DnD hole finder) Pumped 14 BBLS Crude
1/16/2023
***WELL S/I ON ARRIVAL***
R/U POLLARD #58
*** WSR CONT ON 1-17-23***
1/17/2023
***WSR CONT FROM 1-16-23***
RAN 2.81" B-SHIFTING TOOL TO 9,856' MD ( shifted up to "closed" postion)
T-BIRD PERFORMED PASSING PRESSURE TEST ON TBG TO 2500#PSI
SET 4-1/2" WHIDDON CATCHER ON DEPLOY SLV @ 9,830' MD
PULLED ST#1 BK-DGLV FROM 4,696' MD
SET ST#1 BK-SO (20/64" ports) @ 4,696 MD
PULLED 4-1/2" WHIDDON CATCHER @9,830' MD
RAN KJ, BLB, 2.75" GAUGE RING TO ORCA CEMENT VALVE @ 10,159' MD.
RAN 30' x 2.66" DUMMY GUNS TO ORCA CEMENT VALVE @ 10,159 MD
***WELL S/I ON DEPARTURE***
1/17/2023
T/I/O= 400/0/100 (Assist Slickline) TFS U-3, Pumped 2.7 bbls crude down TBG for
TBG pressure test to 2500 psi. MIT-T Passed Bled back approximately 2 bbls.
FWHP= 500/0/100 SL still on well upon departure.
1/19/2023
***WELL SHUT IN ON ARRIVAL***
PRESSURE TEST PCE TO 200# LP-3,000# HP
RIH W/ 1 7/16" CHD (1" FN), 1 11/16" GR/CCL, 2 1/2" PERF GUN (LOADED 30' W/
11GRAM RAZOR CHARGES)
CCL OFFSET=8.5', PERF DEPTH=10,082'-10,112', CCL STOP DEPTH=10,073.5'
PERMIT CLOSED OUT WITH PAD OP
***WELL LEFT SHUT IN***
RIH W/ 30' X 2.66'' DMY GUNS, S/D & TAG BOTTOM @ 10,175' SLM (10,159' MD)
(ORCA CEMENT VALVE)
PERF DEPTH=10,082'-10,112',
SHIFTED SSD CLOSED @ 9,856'MD @
PERFORMED PASSING TEST PRESSURE TEST TO 2500PSI ON TBG
SHIFTED SSD OPEN @ 9,856'MD
RIH W/ 1 7/16" CHD (1" FN), 1 11/16" GR/CCL, 2 1/2" PERF GUN (LOADED 30' W /()
11GRAM RAZOR CHARGES))
Kyle Wiseman Hilcorp Alaska, LLC
Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: Kyle.Wiseman@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 01/10/2023
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20230110
Well API #PTD #Log Date Log Company Log Type AOGCC Eset#
PBU E-102 50029230420000 201186 1/1/2023 READ MemoryCementBondLog
PBU W-06B 50029218220200 222099 1/6/2023 READ MemoryRadialCementBondLog
Please include current contact information if different from above.
By Meredith Guhl at 11:54 am, Jan 10, 2023
T37430
T37431
PBU E-102 50029230420000 201186 1/1/2023 READ MemoryCementBondLog
Meredith Guhl Digitally signed by Meredith Guhl
Date: 2023.01.10 11:58:07 -09'00'
,ISHUIRUDWLQJ
7\SHRI5HTXHVW
2SHUDWRU1DPH
$GGUHVV
&XUUHQW:HOO&ODVV3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
:HOO1DPHDQG1XPEHU
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU)LHOG3RROV
$EDQGRQ
6XVSHQG
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO
3HUIRUDWH
3OXJ3HUIRUDWLRQV
5HHQWHU6XVS:HOO
2WKHU6WLPXODWH
)UDFWXUH6WLPXODWH
$OWHU&DVLQJ
3XOO7XELQJ
5HSDLU:HOO
2WKHU
&KDQJH$SSURYHG3URJUDP
2SHUDWLRQVVKXWGRZQ
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKHVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
35(6(17:(//&21',7,216800$5<
3HUIRUDWLRQ'HSWK0'IW 3HUIRUDWLRQ'HSWK79'IW7XELQJ6L]H 7XELQJ*UDGH 7XELQJ0'IW
3DFNHUVDQG66697\SH3DFNHUVDQG66690'IWDQG79'IW
&DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH
([SORUDWRU\
6WUDWLJUDSKLF
'HYHORSPHQW
6HUYLFH
$WWDFKPHQWV
(VWLPDWHG'DWHIRU
&RPPHQFLQJ2SHUDWLRQV
:HOO&ODVVDIWHUSURSRVHGZRUN
:HOO6WDWXVDIWHUSURSRVHGZRUN
9HUEDO$SSURYDO
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURFDO
3URSRVDO6XPPDU\:HOOERUHVFKHPDWLF
%236NHWFK'HWDLOHG2SHUDWLRQV3URJUDP
2,/
*$6
:,1-
:$*
*,1-
:'63/
*6725
2S6KXWGRZQ
6XVSHQGHG
63/8*
$EDQGRQHG
6HUYLFH'HYHORSPHQW6WUDVWLJUDSKLF([SORUDWRU\
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$XWKRUL]HG7LWOH
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
$2*&&86(21/<
&RPPLVVLRQ5HSUHVHQWDWLYH
&RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
/RFDWLRQ&OHDUDQFH0HFKDQLFDO,QWHJULW\7HVW%237HVW3OXJ,QWHJULW\
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV
<HV 1R
1R 6XEVHTXHQW)RUP5HTXLUHG
$SSURYHG%\'DWH
$33529('%<
7+($2*&&&200,66,21(5
3%8(
,QVWDOO&HPHQWHG6FDE
/LQHUZ&78
+LOFRUS1RUWK6ORSH//&
&HQWHUSRLQW'U6XLWH
$QFKRUDJH$.
+
$'/
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
1RQH
/
6WUXFWXUDO
%DNHU63DFNHU
1R6669,QVWDOOHG
1R6669,QVWDOOHG
'DWH
6WDQ*ROLV
6U$UHD2SHUDWLRQV0DQDJHU
1RHO1RFDV
1RHO1RFDV#KLOFRUSFRP
358'+2(%$<0,'1,*+76812,/
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
&RPP &RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
[
By Anne Prysunka at 4:21 pm, Aug 05, 2022
'LJLWDOO\VLJQHGE\6WDQ*ROLV
'1FQ 6WDQ*ROLV
RX 8VHUV
'DWH
6WDQ*ROLV
'65
$'/6)'
6)'0*5$8*
GWV -/&
Jeremy
Price
Digitally signed by Jeremy Price
Date: 2022.08.19 08:21:12 -08'00'
RBDMS JSB 082322
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
tĞůůEĂŵĞ͗ͲϭϬϮ W/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϯϬϰϮͲϬϬ
ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^/͕ KƉĞƌĂďůĞ ZŝŐ͗^ůŝĐŬůŝŶĞͬŽŝů
ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϬϴͬϬϭͬϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϯĚĂLJƐ
ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞĂƌŬĞƌ ϱϲϰͲϰϵϭϱ
&ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗EŽĞů EŽĐĂƐ ϵϬϳͲϮϮϵͲϵϱϯϮ
^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗ůĂŝƌĞDĂLJĨŝĞůĚ ϳϭϯͲϰϰϯͲϯϲϯϭ
džƉĞĐƚĞĚƌĂƚĞƐƉŽƐƚǁŽƌŬ͗ϰϬϬϬ>W͕ϴϬйt͕ϮŵŵƐĐĨĚ
ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ϯ͕Ϯϲϱ ƉƐŝΛϴ͕ϬϱϬ͛ds ϳ͘ϴ WW'ͮdĂŬĞŶ ϱͬϳͬϮϬϮϮ
DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯ͕ϯϱϬ ƉƐŝΛϴ͕ϬϱϬ͛ds ϴ͘Ϭ WW'
DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗Ϯ͕ϱϰϱƉƐŝ ;ĂƐĞĚŽŶϬ͘ϭƉƐŝͬĨƚ͘ŐĂƐŐƌĂĚŝĞŶƚͿ
>ĂƐƚ^/t,W͗ϱϬϬ ƉƐŝ ;dĂŬĞŶŽŶ ϱͬϳͬϮϮͿ
DŝŶ/͗ϯ͘ϳϮϱ͟yEEŝƉƉůĞΛϵϴϯϲ͛D
DĂdžŶŐůĞ͗ϰϰ ĞŐΛ ϳϲϬϬ͛D
dŝĞ/Ŷ>ŽŐ͗ϱͲϭͲϮϬϬϰŽƌĂdž>ŽŐ
ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗
ͲϭϬϮŝƐĂDŝĚŶŝŐŚƚ^ƵŶƉƌŽĚƵĐĞƌĨůŽǁŝŶŐƚŽ'ϭŚŽǁĞǀĞƌƚŚĞŵĂũŽƌŝƚLJŽĨƚŚĞƉƌŽĚƵĐƚŝŽŶĂŶĚŚŝŐŚǁĂƚĞƌĐƵƚŝƐ
ĐŽŵŝŶŐĨƌŽŵƚŚĞƵƉƉĞƌƉĞƌĨŽƌĂƚŝŽŶƐ͘^ƋƵĞĞnjĞƐŝŶƚŚĞƉĂƐƚŚĂǀĞďĞĞŶƵŶƐƵĐĐĞƐƐĨƵůŝŶƐŚƵƚƚŝŶŐŽĨĨǁĂƚĞƌ͘
KďũĞĐƚŝǀĞƐ͗
dŚĞŽďũĞĐƚŝǀĞŽĨƚŚŝƐƉƌŽŐƌĂŵŝƐƚŽĐĞŵĞŶƚĂƐĐĂďůŝŶĞƌĂĐƌŽƐƐƚŚĞƉƌŽĚƵĐƚŝŽŶůŝŶĞƌƚŽƐŚƵƚŽĨĨƵŶǁĂŶƚĞĚǁĂƚĞƌ
ĐŽŵŝŶŐĨƌŽŵƚŚĞƵƉƉĞƌƉĞƌĨŽƌĂƚŝŽŶƐ͘
WƌŽĐĞĚƵƌĞ͗
^ůŝĐŬůŝŶĞ
ϭ͘ D/ZhĂŶĚWd
Ϯ͘ ƌŝĨƚǁŝƚŚƐĂŵƉůĞďĂŝůĞƌĚŽǁŶƚŽ/W͕ŶŽƚĞĂŶLJĨŝůůĂŶĚƐĞŶĚƉŝĐƚƵƌĞƐƚŽK͘ĂŝůĚŽǁŶƚŽ/WĂƐ
ŶĞĐĞƐƐĂƌLJ͘
ϯ͘ &ŝƐŚ/W͘/ĨƵŶĂďůĞƚŽĨŝƐŚ͕ůĞĂǀĞĐŽŝůǁŝƚŚŝŵƉƌĞƐƐŝŽŶŽĨĨŝƐŚŶĞĐŬ͘
ϰ͘ WƵůůĂůŝƉĞƌĨƌŽŵdƚŽƐƵƌĨĂĐĞ͘^ĞŶĚĚĂƚĂƚŽKĨŽƌƵƌƐƚͬŽůůĂƉƐĞĐĂůĐƵůĂƚŝŽŶƐ͘
ϱ͘ ^Ğƚ'>sŝŶƐƚĂƚŝŽŶϭ͘'Ğƚ&>ƐŚŽƚŽŶdƵďŝŶŐ͕ĐĂůůK ĂŶĚĐŽŶĨ ŝƌŵD/dͲ/ƉƌĞƐƐƵƌĞ
ϲ͘ D/dͲ/ƚŽ ΕϭϬϬϬƉƐŝ ƚŽĐŽŶĨŝƌŵĚƵŵŵLJŝƐŚŽůĚŝŶŐ͘
ϳ͘ &ŝŶĂůƐƚĞƉŽĨ^>ƉƌŽŐƌĂŵƐŚŽƵůĚďĞƚŽĚƌŝĨƚǁŝƚŚĨƵůůKƌĞƉƌ ĞƐĞŶƚŝŶŐKZĂŶĚƐĐĂďůŝŶĞƌ ĂŶĚŐĞƚ
ĂĐĐƵƌĂƚĞƚĂůůLJůĞŶŐƚŚŽĨƐĐĂďůŝŶĞƌ͘ hƚŝůŝnjĞƚƵďŝŶŐĞŶĚůŽĐĂƚŽƌĨŽƌĂĚĚŝƚŝŽŶĂůĚĞƉƚŚĐŽŶƚƌŽů͘
ϴ͘ ZDK
ŽŝůĞĚdƵďŝŶŐ
&ŝƐŚ/W
ϭ͘ D/ZhdƵŶŝƚĂŶĚƐƉŽƚĂŶĐŝůůĂƌLJĞƋƵŝƉŵĞŶƚ͘/Ĩ^>ĚŝĚŶŽƚĨŝƐŚ /W͕Ă&KƌƵŶŵĂLJďĞŶĞĐĞƐƐĂƌLJƚŽǁŽƌŬ
ĚŽǁŶƚŽ/WĨŝƐŚŶĞĐŬ͘Z/,ǁŝƚŚEŽnjnjůĞĂŶĚ&KƚŽ/W͘WKK,
Ϯ͘ ZhĨŝƐŚŝŶŐ,ĂŶĚ&ŝƐŚ/W ;ŝĨŶĞĞĚĞĚͿ
ϯ͘ &KƚŽd͕ĨůĂŐƉŝƉĞΛWdĨŽƌdĂůůLJ͘/ĨƵŶĂďůĞƚŽĨŝƐŚ/WĐŽŶƚĂĐƚK͘ĚũƵƐƚƚĂůůLJͲ ƐĐĂďůŝŶĞƌůĞŶŐƚŚƐ
ƚŽƌĞƉƌĞƐĞŶƚƌĞĐĞŶƚĚĞĞƉĞƐƚƚĂŐĂŶĚĨůĂŐƉŝƉĞĂĐĐŽƌĚŝŶŐůLJ͘ &ŝŶĂůĚƌŝĨƚĐĂŶďĞŚĞƌĞŽƌƐƚĞƉϳďĞůŽǁ͘
ϰ͘ WƌĞƉĂƌĞĨŽƌ^ĐĂďůŝŶĞƌƌƵŶ
Ϯ͕ϱϰϱƉƐŝ
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
^hEZzWZKhZ;WWZKs>ZYh/ZdKWZKͿ
^ĐĂď>ŝŶĞƌ
EŽƚĞƐ͗
x ƵĞƚŽƚŚĞŶĞĐĞƐƐĂƌLJŽƉĞŶŚŽůĞĚĞƉůŽLJŵĞŶƚŽĨƚŚŝƐƐĐĂďůŝŶĞƌũŽď͕ĂϮϰͲŚŽƵƌĐƌĞǁĂŶĚt^^ĐŽǀĞƌĂŐĞ
ŝƐƌĞƋƵŝƌĞĚ͘
x dŚĞǁĞůůǁŝůůďĞŬŝůůĞĚĂŶĚŵŽŶŝƚŽƌĞĚďĞĨŽƌĞŵĂŬŝŶŐƵƉƚŚĞ ^>/EZ͘dŚŝƐŝƐŐĞŶĞƌĂůůLJĚŽŶĞĚƵƌŝŶŐ
ƚŚĞĚƌŝĨƚͬůŽŐŐŝŶŐƌƵŶ͘ dŚŝƐǁŝůůƉƌŽǀŝĚĞŐƵŝĚĂŶĐĞĂƐƚŽǁŚĞƚŚĞƌƚŚĞǁĞůůǁŝůůďĞŬŝůůĞĚďLJďƵůůŚĞĂĚŝŶŐ
ŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚŽƵƚƚŚĞũŽď͘ /ĨƉƌĞƐƐƵƌĞŝƐƐĞĞŶ ǁŚŝůĞƌƵŶŶŝŶŐůŝŶĞƌ͕ŽƌŝĨǁĞŶĞĞĚƚŽ
WKK,ǁŝƚŚůŝŶĞƌ͕ŝƚǁŝůůĞŝƚŚĞƌďĞŬŝůůĞĚďLJďƵůůŚĞĂĚŝŶŐǁŚŝůĞWKK,ŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚ
ƚŚĞ ƐĐĂďůŝŶĞƌ͘ĨƚĞƌƉůĂĐŝŶŐƚŚĞƐĐĂďůŝŶĞƌŽŶĚĞƉƚŚ͕ǁĞǁŝůůďĞĂďůĞƚŽƉĞƌĨŽƌŵŶŽƌŵĂůůƵďƌŝĐĂƚĞĚ
ŽƉĞƌĂƚŝŽŶƐ͘
ϱ͘ ĨƚĞƌDhD,ĂŶĚƉƵůůƚĞƐƚŝŶŐƚŚĞd͕ƚĂŐͲƵƉŽŶƚŚĞdƐƚƌŝƉƉĞƌƚŽĞŶƐƵƌĞ,ĐĂŶŶŽƚƉƵůůƚŚƌŽƵŐŚ
ƚŚĞďƌĂƐƐ ŝĨŝƚŝƐŶĞĐĞƐƐĂƌLJƚŽWKK,ǁŝƚŚůŝŶĞƌ͘
ϲ͘ ƵůůŚĞĂĚΕϯϬϬďďůƐϭй<>ͬ^tĚŽǁŶƚƵďŝŶŐ͘DĂdžƚƵďŝŶŐƉƌĞƐƐƵƌ ĞϮϱϬϬƉƐŝ͘ ;dŚŝƐƐƚĞƉĐĂŶďĞ
ƉĞƌĨŽƌŵĞĚĂŶLJƚŝŵĞƉƌŝŽƌƚŽŽƉĞŶͲŚŽůĞĚĞƉůŽLJŵĞŶƚŽĨƚŚĞ ƐĐĂďůŝŶ Ğƌ͘dŝŵŝŶŐŽĨƚŚĞǁĞůůŬŝůůŝƐĂƚƚŚĞ
ĚŝƐĐƌĞƚŝŽŶŽĨƚŚĞt^^͘Ϳ
^ĞĐƚŝŽŶ ŽƚƚŽŵ dŽƉ >ĞŶŐƚŚ ĂƉĂĐŝƚLJ sŽůƵŵĞ
ϳͲϱͬϴΗ>ŝŶĞƌ ϭϬϭϵϬ͛ϵϴϰϳ͛ϯϰϯ͛Ϭ͘Ϭϰϱϵϭϲ ϭϱ͘ϳ
ϰͲϭͬϮΗdƵďŝŶŐ ϵϴϰϳ͛ϵϳϱϵ͛ϴϴ͛Ϭ͘ϬϭϱϮ ϭ͘ϯ
ϱͲϭͬϮΗdƵďŝŶŐ ϵϳϱϵ͛Ϭ ϵϳϱϵ͛Ϭ͘ϬϮϯϴ ϮϯϮ͘ϯ
dŽƚĂů Ϯϰϵ͘ϰďďůƐ
ϳ͘ DhĂŶĚZ/,ǁŝƚŚůŽŐŐŝŶŐƚŽŽůƐĂŶĚĚƌŝĨƚ,͘ ;ŝĨŶŽƚĚŽŶĞŝŶƉƌĞǀŝŽƵƐƐĞĐƚŝŽŶ͘Ϳ
ϴ͘ &ůĂŐƉŝƉĞĂƐĂƉƉƌŽƉƌŝĂƚĞƉĞƌt^^ ĨŽƌ ƐĐĂďůŝŶĞƌƌƵŶ͘
ϵ͘ WKK,ĂŶĚ ĨƌĞĞnjĞƉƌŽƚĞĐƚƚƵďŝŶŐĂƐŶĞĞĚĞĚ͘
ϭϬ͘ ŽŶĨŝƌŵŐŽŽĚ ůŽŐ ĚĂƚĂ͘
ϭϭ͘ ƚƐƵƌĨĂĐĞ͕ƉƌĞƉĂƌĞĨŽƌĚĞƉůŽLJŵĞŶƚŽĨ ƐĐĂďůŝŶĞƌ͘
ϭϮ͘ ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘ůĞĞĚĂŶLJƉƌĞƐƐƵƌĞŽĨĨƚŽƌĞƚƵƌŶƚĂŶŬ͘<ŝůůǁĞůůǁͬ<t&͕ϴ͘ϰƉƉŐϭй<ůŽƌϴ͘ϱ
ƉƉŐ ĂƐŶĞĞĚĞĚ͘DĂŝŶƚĂŝŶŚŽůĞĨŝůůƚĂŬŝŶŐƌĞƚƵƌŶƐƚŽƚĂŶŬƵŶƚŝůůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶŝƐƌĞͲĞƐƚĂďůŝƐŚĞĚ͘
&ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚǁŚŝůĞ ƐĐĂďůŝŶĞƌ ŝƐĚĞƉůŽLJĞĚ ƚŽĞŶƐƵƌĞƚŚĞǁĞůůƌĞŵĂŝŶƐŬŝůůĞĚ
ĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘
ϭϯ͘ΎWĞƌĨŽƌŵĚƌŝůůďLJƉŝĐŬŝŶŐ ƵƉƐĂĨĞƚLJũŽŝŶƚ ǁŝƚŚ d/tǀĂůǀĞĂŶĚƐƉĂĐĞŽƵƚďĞĨŽƌĞDh ůŝŶĞƌ͘ZĞǀŝĞǁǁĞůů
ĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐŵĂŬĞƵƉŽĨ ƐĐĂďůŝŶĞƌ͘
KŶĐĞƚŚĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞŚĂǀĞďĞĞŶƐƉĂĐĞĚ ŽƵƚ͕ŬĞĞƉƚŚĞƐĂĨĞƚLJũŽŝŶƚͬd/tǀĂůǀĞƌĞĂĚŝůLJ
ĂĐĐĞƐƐŝďůĞŶĞĂƌƚŚĞǁŽƌŬŝŶŐƉůĂƚĨŽƌŵĨŽƌ ƋƵŝĐŬĚĞƉůŽLJŵĞŶƚŝĨŶĞĐĞƐƐĂƌLJ͘
Ă͘ƚƚŚĞďĞŐŝŶŶŝŶŐŽĨĞĂĐŚũŽď͕ƚŚĞĐƌŽƐƐŽǀĞƌͬƐĂĨĞƚLJũŽŝŶƚŵƵƐƚďĞ ƉŚLJƐŝĐĂůůLJDhƚŽƚŚĞ ůŝŶĞƌ ŽŶĞ
ƚŝŵĞ ƚŽĐŽŶĨŝƌŵƚŚĞƚŚƌĞĂĚƐĂƌĞĐŽŵƉĂƚŝďůĞ͘
ϭϰ͘ƌĞĂŬůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂƚYd^ĂŶĚďĞŐŝŶŵĂŬĞƵƉŽĨ ƐĐĂďƉĞƌĚŝƌĞĐƚŝŽŶƐ ďĞůŽǁ͘ ŽŶƐƚĂŶƚůLJ
ŵŽŶŝƚŽƌĨůƵŝĚƌĂƚĞƐƉƵŵƉĞĚŝŶĂŶĚĨůƵŝĚƌĞƚƵƌŶƐŽƵƚŽĨƚŚĞǁĞůů ͘ &ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚ
ǁŚŝůĞ ƐĐĂďůŝŶĞƌ ƚŽĞŶƐƵƌĞƚŚĞǁĞůůƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘
ϭϱ͘ DhΕϯϱϬ͛ŽĨϯͲϭͬϮ͟ ϵ͘Ϯη >ͲϴϬ ůŝŶĞƌ;ϯϮϮϬůďƐŚĂŶŐŝŶŐǁĞŝŐŚƚŝŶĂŝƌͿĂƐƐĞŵďůLJ͘^ĞĞĂƚƚĂĐŚĞĚůŝŶĞƌ
ĚŝĂŐƌĂŵĨŽƌƌĞĨĞƌĞŶĐĞ͘ EŽƚĞƚŚĂƚƚŚĞůŝŶĞƌǁŝůůŶŽƚŚĂǀĞĨůŽĂƚƐŝŶƐƚĂůůĞĚ͕Ăd/tǀĂůǀĞĐĂŶďĞƐƚĂďďĞĚĂŶĚ
ŵĂdžƉƵŵƉƌĂƚĞĞƐƚĂďůŝƐŚĞĚĚŽǁŶƚŚĞůŝŶĞƌŝĨŶĞĞĚĞĚ͘ KŶĐĞĂůůƚŚĞůŝŶĞƌŝƐDh͕ůĂƚĐŚ'^ŝŶƚŽ 'ͲƉƌŽĨŝůĞŽĨ
ƚŚĞĚĞƉůŽLJŵĞŶƚƐůĞĞǀĞĂŶĚůŽǁĞƌůƵďƌŝĐĂƚŽƌĚŽǁŶƵŶƚŝůƚŚĞYd^ŝƐDh͘WƌĞƐƐƵƌĞƚĞƐƚƚŚĞYd^ƉƌŝŽƌƚŽ
ĚĞƉůŽLJŵĞŶƚ͘
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
Ă͘ dŚĞůĞŶŐƚŚŽĨƐĐĂďůŝŶĞƌ ǁŝůůďĞĚĞƚĞƌŵŝŶĞĚďLJƐůŝĐŬůŝŶĞĚƌŝĨƚͬĐƚĚĚƌŝĨƚĚĞƉĞŶĚŝŶŐŽŶ/WƌĞŵŽǀĂů͘
,ŽǁĞǀĞƌ͕ŝƚ͛ƐĂƐƐƵŵĞĚƚŽďĞΕϯϱϬ͛ĨŽƌƚŚĞĐĂůĐƵůĂƚŝŽŶƐŝŶƚŚŝƐƉƌŽŐƌĂŵ͘
ď͘ 'ŽĂůŝƐƚŽůĞĂǀĞ ΕϭϬ͛ŽĨƌĂƚŚŽůĞďĞůŽǁƚŚĞůŝŶĞƌ
ϭϲ͘ Z/,ĂŶĚƐĞƚ ƐĞĂůĞĚ ŶŽͲŐŽŝŶyEEŝƉĂƚϵϴϯϲ͛ĂŶĚŚĂŶŐůŝŶĞƌŽĨĨ͘WKK,͘
ΎĞŶĚŽĨŽƉĞŶŚŽůĞĚĞƉůŽLJŵĞŶƚƐƚĞƉƐΎ
ϭϳ͘ DhϯͲϭͬϮ͟ĐĞŵĞŶƚƌĞƚĂŝŶĞƌƉƌŽǀŝĚĞĚďLJEŽƌƚŚĞƌŶ^ŽůƵƚŝŽŶƐ ĂŶĚZ/,͘tŚŝůĞZ/,͕ůŽĂĚĚŝĞƐĞůĚŽǁŶ
ďĂĐŬƐŝĚĞƚŽƵŶĚĞƌďĂůĂŶĐĞǁĞůůĨŽƌĐĞŵĞŶƚƐƋƵĞĞnjĞ͘>ŝŐŚƚůLJƚĂŐďƵůůŶŽƐĞŽŶĞŶĚŽĨůŝŶĞƌ͕Wh,ϭϬ͛ĂŶĚ
ƐĞƚĐĞŵĞŶƚƌĞƚĂŝŶĞƌ͘&ůĂŐƉŝƉĞ͘
Ă͘ dŚĞǀŽůƵŵĞŽŶďĂĐŬƐŝĚĞŽĨϯͲϭͬϮ͟ƐĐĂďůŝŶĞƌdžϳ͟ůŝŶĞƌŝƐΕ͘ϬϯϰďƉĨy;ϯϱϬ͛ͿсϭϮďďůƐ͘
ϭϴ͘ WƵŵƉĐĞŵĞŶƚĚŽǁŶĐŽŝůĂĐĐŽƌĚŝŶŐƚŽƚŚĞĨŽůůŽǁŝŶŐƐĐŚĞĚƵůĞ;^ĞĞĐĞŵĞŶƚŝŶĨŽƌŵĂƚŝŽŶĂƚƚĂĐŚŵĞŶƚĨŽƌ
ĚĞƚĂŝůƐͿ͗
Ă͘ ϭϬďďůƐ&ƌĞƐŚǁĂƚĞƌ
ď͘ ϰϬďďůƐϭϱ͘ϴƉƉŐůĂƐƐ'ĐĞŵĞŶƚ
ŝ͘ tŚĞŶĐĞŵĞŶƚŚŝƚƐƚŚĞ͞ŶŽnjnjůĞ͟ ďĞŐŝŶƚĂŬŝŶŐ ϭ͗ϭƌĞƚƵƌŶƐĐŝƌĐƵůĂƚŝŶŐϭϭ͘ϱďďůƐŽĨĐĞŵĞŶƚ
ƵƉƚŚĞďĂĐŬƐŝĚĞŽĨƚŚĞϯͲϭͬϰ͟ƐĐĂďůŝŶĞƌďƌŝŶŐŝŶŐƚŚĞĐĞŵĞŶƚƚŽƉŽŶƚŚĞďĂĐŬƐŝĚĞŽĨƚŚĞ
ƐĐĂďůŝŶĞƌƚŽ ŽƌĐĂƐůŝĚŝŶŐƐůĞĞǀĞ
ŝŝ͘ ĨƚĞƌϭϭ͘ϱďďůƐŽĨĐĞŵĞŶƚĚŝƐƉůĂĐĞŵĞŶƚŚĂƐďĞĞŶƌĞƚƵƌŶĞĚƚŽƚŚĞϰϬďďůƚĂŶŬ͕^/ƚŚĞ
ĐŚŽŬĞĂŶĚďĞŐŝŶƐƋƵĞĞnjŝŶŐƚŚĞĨŽƌŵĂƚŝŽŶ͘ĨƚĞƌ ΕϭϬďďůƐŚĂƐďĞĞŶƐƋƵĞĞnjĞĚĂǁĂLJŝŶƚŽ
ĨŽƌŵĂƚŝŽŶ͕ƉĞƌĨŽƌŵŚĞƐŝƚĂƚŝŽŶƐƋƵĞĞnjĞ͘dĂƌŐĞƚƐƋƵĞĞnjĞƉƌĞƐƐƵƌĞŝƐϯϬϬϬƉƐŝ͕ďƵƚŶŽƚ
ƌĞƋƵŝƌĞĚ͘
Đ͘ /ĨŶŽƐƋƵĞĞnjĞŝƐŽďƚĂŝŶĞĚ͕ĐŽŶƚŝŶƵĞƚŽĚŝƐƉůĂĐĞĐĞŵĞŶƚǁŚŝůĞ^/ŽŶĐŚŽŬĞ͘
Ě͘ &ŽůůŽǁĐĞŵĞŶƚǁŝƚŚ ϮϬďďůƐ&ƌĞƐŚǁĂƚĞƌ͘
Ğ͘ ϭϬďďůƐŽĨ&WƐŽƚŚĞ ƐƵƌĨĂĐĞĐŽŝůŝƐ&W͛ĚǁŚŝůĞƉĞƌĨŽƌŵŝŶŐŚĞƐŝƚĂƚŝŽŶƐƋƵĞĞnjĞ͘;dŚŝƐƐƚĞƉĐĂŶďĞ
ƐŬŝƉƉĞĚŝĨƉĞƌĨŽƌŵŝŶŐŝŶǁĂƌŵĞƌǁĞĂƚŚĞƌ͕t^>ĚŝƐĐƌĞƚŝŽŶ͘Ϳ
ϭϵ͘ ĨƚĞƌĂŐŽŽĚƐƋƵĞĞnjĞŝƐŽďƚĂŝŶĞĚ͕ ŽƌĂůůĐĞŵĞŶƚŝƐĚŝƐƉůĂĐĞĚƚŽďĂĐŬƐŝĚĞ͕ ƵŶƐƚŝŶŐĨƌŽŵĨůŽĂƚĂƐƐĞŵďůLJ͕
ƉŝĐŬƵƉĂŶĚĐůŽƐĞ ƐůŝĚŝŶŐƐůĞĞǀĞ͕Z/,ƚŚĞŶ ĂŶĚƉƵŵƉƚŚĞĨŽůůŽǁŝŶŐ ͗
Ă͘ ϮϬďďůƐWŽǁĞƌsŝƐ ʹ hŶƐƚŝŶŐ͕ŽƉĞŶĐŚŽŬĞǁŚŝůĞŵĂŝŶƚĂŝŶŝŶŐϮϬϬƉƐŝt,WĂŶĚďĞŐŝŶũĞƚƚŝŶŐ
WŽǁĞƌsŝƐƚŚƌŽƵŐŚŽƵƚůŝŶĞƌǁŚŝůĞWh,͘ZĞĐŝƉƌŽĐĂƚĞĂĐƌŽƐƐƚŽƉŽĨůŝŶĞƌŵƵůƚŝƉůĞƚŝŵĞƐƚŽĞŶƐƵƌĞ
ĐĞŵĞŶƚŝƐĐůĞĂƌŽĨůŝŶĞƌ ƚŽƉ ũĞǁĞůƌLJ͘
ď͘ ϭй<ůŽƌƐĞĂǁĂƚĞƌ ʹ ^ǁĂƉƚŽ<ůĂŶĚĐůĞĂŶŽƵƚWŽǁĞƌsŝƐĐŽŶƚĂŝŵƉŝůůĚŽǁŶƚŽϱ͛ĂďŽǀĞĨůĂŐĂŶĚ
ĐŚĂƐĞKK,ĂƚϴϬй͘
Đ͘ :ĞƚĂĐƌŽƐƐKWƐ͘
Ě͘ >ĞĂǀĞϮϬϬƉƐŝt,WƵƉŽŶũŽďĐŽŵƉůĞƚŝŽŶ͘
ϮϬ͘ &WǁĞůůĂƐŶĞĐĞƐƐĂƌLJ͘
ŶĚŽĨϭϬͲϰϬϯƉƉƌŽǀĂů^ƵŶĚƌLJWƌŽĐĞĚƵƌĞ
,ͬ&ƵůůďŽƌĞ;ĂĨƚĞƌtKϯĚĂLJƐͿ
Ϯϭ͘ D/dͲdƚŽϭϬϬϬƉƐŝ͘
^ůŝĐŬůŝŶĞ
ϮϮ͘ ƌŝĨƚƚŽdǁŝƚŚϮ͘ϱ͟ĐĞŶƚĂŶĚϯϬ͛ĚŵLJŐƵŶƐ͘
Ϯϯ͘ ZƵŶ>ǁͬ'Zͬ>ĨƌŽŵdƚŽƚŽƉŽĨƐĐĂďůŝŶĞƌ͘dŚŝƐůŽŐǁŝůůĂůƐŽďĞƵƐĞĚƚŽĂƐƚŚĞŶĞǁũĞǁĞůƌLJͬƚŝĞͲŝŶ
ůŽŐĨŽƌƐƵďƐĞƋƵĞŶƚƉĞƌĨŽƌĂƚŝŶŐ͘
Ϯϰ͘ /ŶƐƚĂůůŐĞŶĞƌŝĐ'>sƉĞƌ'>͘
^ůŝĐŬůŝŶĞ
ϭ͘ ^ŚŽŽƚƉĞƌĨŝŶƚĞƌǀĂůƐĂĨƚĞƌŶĞǁϯͲϭͬϰ͟ůŝŶĞƌŝƐĐĞŵĞŶƚĞĚŝŶƉůĂĐĞĂŶĚŝƐŽůĂƚŝŽŶŝƐĐŽŶĨŝƌŵĞĚǁŝƚŚƚŚĞ>͘
ŶĚŽĨϭϬͲϰϬϯƉƉƌŽǀĂů^ƵŶĚƌLJWƌŽĐĞĚƵƌĞ
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
Ă͘ dŚŽƵŐŚƉĞƌĨŝŶƚĞƌǀĂůƐǁŝůůďĞĐŚŽƐĞŶŽĨĨŐĂŵŵĂƌĂLJ͕ƚŚĞĞdžĂĐƚƉĞƌĨŝŶƚĞƌǀĂůƐǁŝůůŶŽƚďĞ ƉƌŽǀŝĚĞĚ
ƵŶƚŝůƚŚĞŶĞǁũĞǁĞůƌLJůŽŐŝƐĐƌĞĂƚĞĚĨƌŽŵ>ƌƵŶ͘
ď͘ džƉĞĐƚĞĚĨŽŽƚĂŐĞŝƐϲϬ͛;ϭϬ͕ϬϱϴͲϭϬ͕ϬϴϮ͛ĂŶĚϭϬ͕ϬϵϰͲϭϬ͕ϭϮϰ͛DͿďƵƚǁŝůůďĞƵƉĚĂƚĞĚďĂƐĞĚŽŶ
/WƌĞŵŽǀĂůĂŶĚĨŝŶĂůƐĐĂďƉůĂĐĞŵĞŶƚ͘
Ϯ͘ /ŶĨŽƌŵ^KƚŽWKWǁĞůů͘
ƚƚĂĐŚŵĞŶƚƐ͗
ϭ͘ ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ
Ϯ͘ WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ
ϯ͘ ŽŝůdƵďŝŶŐKW^ĐŚĞŵĂƚŝĐ
ϰ͘ ^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽů ĚƵƌŝŶŐůŝŶĞƌĚĞƉůŽLJŵĞŶƚ
ϱ͘ ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚ ŝĂŐƌĂŵ
ϲ͘ ĞŵĞŶƚ/ŶĨŽƌŵĂƚŝŽŶ
ϳ͘ ^ƵŶĚƌLJŚĂŶŐĞ&Žƌŵ
5HSHUIRUDWLRQRIH[LVWLQJ
SHUIRUDWLRQLQWHUYDOV
6)'
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ
Ͳ
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
WƌŽƉŽƐĞĚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
ŽŝůĞĚdƵďŝŶŐKWƐ
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐ ůŝŶĞƌ ĞƉůŽLJŵĞŶƚ
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ
tĞůů͗ ͲϭϬϮ
Wd͗ϮϬϭͲϭϴϲ
ĞŵĞŶƚ/ŶĨŽƌŵĂƚŝŽŶ
ĞŵĞŶƚdLJƉĞ͗ůĂƐƐ'
dŚŝĐŬĞŶŝŶŐdŝŵĞ͗ϲŚŽƵƌƐƵƐŝŶŐƌĂŵƉďĞůŽǁ
&ůƵŝĚůŽƐƐ͗фϱϬͲϲϬŵůͬϯϬŵŝŶ
ĞŶƐŝƚLJ͗ϭϱ͘ϴƉƉŐ
Wǀ͗ϮϱͲϰϱĐƉ
dLJ͗фϱůďĨͬϭϬϬĨƚϮ
&ŝůƚĞƌĐĂŬĞ͗Ϭ͘ϳϱ͟Ͳϭ͘Ϭ͟
&ƌĞĞtĂƚĞƌ͗Ϭ
h͗WƌĞͲũŽďŽŶůLJ
&HPHQW7KLFNHQLQJWLPH
FDOFXODWLRQV
KUVPL[LQJ VKHDULQJVXUIDFHWLPH3UHSXPSLQJ
3-60
KRXUSXPSLQJ
WLPH
KRXUWR
FRQWDPLQDWH
KRXUVDIHW\
IDFWRU
7RWDO
KRXUVPLQLPXPWKLFNHQLQJWLPH
&HPHQW*HO7HVWLQJ6FKHGXOHUDPS%+67LVa
)
PLQXWH%DWFKWLPHGHJ)DQGSVL
PLQXWHUDPSWRGHJ) DQG
SVL
PLQXWHUDPSWRGHJ)DQG
SVL
PLQXWHUDPSWR)DWSVL
PLQXWHUDPSGRZQWRSVLDQGVWDUWDGHJ)SHUPLQXWH
LQFUHDVHWR%+67 +ROGXQWLOHQGRIWHVW
+LOFRUS 1RUWK6ORSH//&+LOFRUS 1RUWK6ORSH//&Changes to Approved Work Over Sundry Procedure'DWH -XO\ 6XEMHFW &KDQJHVWR$SSURYHG 6XQGU\3URFHGXUHIRU :HOO (6XQGU\ $Q\PRGLILFDWLRQVWR DQ DSSURYHGVXQGU\ ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ &KDQJHVWRDQDSSURYHG VXQGU\ ZLOOEHFRPPXQLFDWHGWRWKH$2*&& E\WKH ZRUNRYHU:2³ILUVWFDOO´HQJLQHHU $2*&&ZULWWHQDSSURYDORIWKHFKDQJHLVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH6WHS3DJH'DWH 3URFHGXUH&KDQJH+163UHSDUHG%\,QLWLDOV+16$SSURYHG%\,QLWLDOV$2*&&:ULWWHQ$SSURYDO5HFHLYHG3HUVRQDQG'DWH$SSURYDO$VVHW7HDP2SHUDWLRQV0DQDJHU 'DWH3UHSDUHG)LUVW&DOO 2SHUDWLRQV (QJLQHHU 'DWH
~chl~n6erger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well Job #
NO. 5447
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
•
~(
.+vv ~. OCIISOn tllVd. _"'- -•'•" `~ .+v~ iou~tii its JCI VICES
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
E-102 (PTD #2011860) UNDERVALUATION for sustained casing pressure - TxIA Communi... Page 1 of 1
•
Regg, James B (DOA)
From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] 1~~'y l(~~I~ ~
Sent: Sunday, October 28, 2007 2:36 PM
To: GPB, GC1 Wellpad Lead; GPB, GC1 OTL; GPB, Area Mgr Central (GC1/3/FS3); Rossberg, R Steven;
Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization
Engr; GPB, Prod Controllers; Regg, James B (DOA); Maunder, Thomas E (DOA); Randall, Jaclyn S;
NSU, ADW WL & Completion Supervisor
Cc: NSU, ADW Well Integrity Engineer; Lau, John, Jack
Subject: E-102 (PTD #2011860) UNDER EVALUATION for sustained casing pressure - TxIA Communication
Attachments: E-102.pdf; E-102 TIO PIot.BMP
Hi all, ~/
Well E-102 (PTD #2011560) has been found to have sustained casing pressure on the IA. The well failed a TIFL on /"
10/26/07 when the wellhead pressures were 2050/2010/6. The well has been classified as Under Evaluation and may be
produced under a 28-day clock. Once tubing integrity has been restored, plans will continue to set live GLVs and IBP for
water shut-off.
The plan for ward is:
1. D: TIFL -FAILED
2. S: DGLV sta #1 ,.,
3. F: MITIA to 3000 psi
A wellbore schematic and TIO plot been included for reference.
«E-102.pdf» «E-102 TIO PIot.BMP»
Please call with any questions.
Thank you,
.,fin ~u6e, ~F: E.
ell Integrity Coordlnatar
P ells Group
Phone: (997j 659-51tt2
Pager: (907) 659-5'1£!0 x1'154
11/1/2007
•
•
LODUZW~4 LODU8UOl LOOUZWOI LOOULU6 100UZW6 LOOULU8 100UZW8 LOOU8U1
'd000 ~ ~~ 0
HOO = 000' L
'd0 ~' 1 ' 000'Z
dS'dt~t^! 'r,'I
'dl -f-
000' £
6q1 -~-
^^^.^...;~.~~.~.ai.3.^....^.^^^..^^^^............^......^...^.^..... 000'b
TREE = 5-118° FMC
4NELLHFA. D =
AC(UATOR= FMC
- NR
KB EI EV =
Br. c~cV _ 64.11`
34.91'
KOP = 900'
;lax Angle = 45 @ 4387'
Datum l<,9D =_
~ 10076`
Daturn
TVD __ 8fl50' SS
10-3f4" CSG; 45.5#, L-80, ID = 9.950" J--( 4422'
-'~~~" HES ~~~p~.E
E-102
991° --TAM PORT COLLAR
2179' S-112" HES X N{P, ID = 4.562„
4686' 1- j 5-112" X 4-1I2" TBG XO, ID = 3.958"
GAS LIFT MANDRELS
D TVD DEV TYPE VLV LATCH PORT DATE
36 3925 40 CA SO BK 20 03/01107
4-1l2" X 5-1i2" TBG XO, ID = 4.892"
~5-112" TBG, 17#: L-80, .0232 bg(, ID = 4.892" ~ 9759'----- 978 5-1/2" X 4-1/2" TBG XQ ID = 3.958"
97'71° 4-112"` HES X NIP, 1D = 3.813„
9791 ° 7-518" X 4-1f2" BKR S-3 PKR, ED = 3.875°
9815' --~4-1/2" HES X NIP: ID = 3.813"
9836' 4-1 i2" HES XN NIP, ID = 3.725„
4-112" TTP, 12.6#, L-80, .0152 bpf, ID = 3.958" 9847' 9849' ID = 3
4-112" WLEG
958"
,
.
PERFGRATION SUMMARY 9859 ELMD (PERF Lt7G 07/10,'043
REF LE}G: SPERRY-SUN MWD ON 10131 /01
ANGLE AT TOP PERF: 30 tt 10006' 9915 20' PUP JT ~NiRA RAG
Note; Refer to Production DB far historical g~erf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-318" 6 10006 - 10036 S 06.`26,`04
3-3i8" 6 10058 - 10082 O 07110?04
3-318" 6 10094 - 10124 fl 07.-10!04
PBTD 10190'
7_5,'8" CSG, 29.7#, L-80, iD = 6.875" 10307'
DATE REV BY COMAJ!ENTS
1i1f31101 UWG9AL C(3PLETEi?t°!
.~.
12;23,01 CyVS?TLH ADD PERFS
fl4i03,04 SLGIKAK SGkUEr'ZE PERFS
06,•'26.%04 DB~:IIKAK CEMENT SQZ
07,!10!04 lv9DC1KA REPERFS
11:12/06 KSH(TLH GLV C/O (11/4106;
DATE REV BY CdMMENTS
Z?02107 GJFITLkI GLLf C/O
SCt~lu~~erg~r
Sehlumberger-DCS t+.; r~~tt~
Anchorage,eAK 199503 2838 ~' 1O u~~ ~ ~ \~ d L U
ATTN: Beth
Well Job B
Log Description
NO.4425
Company: Alaska Oil 8 Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Polaris
Orion
Midnight Sun
Date B! Color CD
E-102 11637355 RST O L ^' / 07/27/07 1 t
W-21D 11626075 CH EDIT PDC GR USIT 03/06107 1
V-222 11638644 CH EDIT PDC GR USIT 06110/07 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. r I ., -
Petrotechnical Data Center lR2-1 r I~
900 E Benson Blvd. _ _. - _;~ [~ ~ ~l
Anchorage AK 99508-4254
Date Delivered: ~,*~~~'4 ~~'~'~ ~~~~~ f
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
I
Received by:
osi2s~o7
•
SChlumbergBP
Schlumberger_DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
A rTN: Beth
Well
E-102
S-215
l-102
W-213
11637355
N/A
11637125
11638637
6~~NED SEP 1 8 2007
Job #
log Description
PRODUCTION PROFILE dDl-I"'if(
USIT ~ a{1ri - J..S"~
CHEDITPDCG~/USI:!l U:t;(.:. ..I':,\-r-o-,,>CL
CH EDIT PDe GR-1USII1 -:ÐS-:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
'Ri>j
Ø~-'1 - -, --, ,n.~,~)
Anchorage AK 99508-4254
~qçjf6eiJ¡,redl ZOO 7
08/30/07
NO. 4401
Company: Alaska Oil & Ga. Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: POlaris
Midnight Sun
Borealis
Date BL Cofor CD
07/28107 1
08/01/07 1
05/16/07 1 ~~'->:J.
05/31/07 1 I ~,., 1(.
.
SChlumberger_Des
2525 Gam""" St. Suite 400
",".- " OO~"I····
ATTN: Beth Þ
Received byf " G
.
E-102 (PTD #2011860) Classified as prOblewn
.
All,
Well E-102 (PTD #2011860) has been found to have sustained casing pressure on the IA. The TIOs on
10/14/06 were 2300/2290/10. A subsequent TIFL failed on 10/21/06.
The plan forward for this well is as follows:
1. DHD: TIFL - FAILED
2. SL: Change out OGL V
3. DHD: Re-TIFL
§Cå~]~:J)
,r,
A wellbore schematic has been included for reference.
«E-102.pdf»
The well has been classified as a Problem well. Please call if you have any questions.
Thank you,
Andrea Hughes
Well Integrity Engineer
Office: (907) 659-5766
Pager: (907) 659-5100 x1242
Content-Description: E-I02.pdf
Content- Type: application/octet-stream
Content-Encoding: base64
1 of 1
10/24/20069:15 AM
TREE"
WElLHEAD =:
ACTUA TOR =:
KB. ElEV =:
BF. ElEV =:
KOP"
Max Angle =:
Datum MD "
Datum TVO"
5-1/8" FMC
FMC
NA
64.11'
34.91'
900'
45 @ 4367'
10076'
8050' SS
I 10-3/4" CSG, 45.5#, L-80, 10'" 9.950" I
Minimum 10 = 3.725" @ 9836'
4-1/2" HES XN NIPPLE
15-1/2" TBG, 17#, L-80, .0232 bpf. 10" 4.892"
9759'
14-1/2" ITP, 12.6#, L-80, .0152 bpf, 10" 3.958"
9847'
ÆRFORA TION SUMIIi1.ARY
REF LOG: SÆRRY-SUN MWD ON 10/31/01
ANGLEATTOPÆRF: 30@ 10006'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DA TE
3-318" 6 10006 - 10036 S 06/26/04
3-3/8" 6 10058 - 10082 0 07/10/04
3-3/8" 6 10094 - 10124 0 07/10/04
I PBTD I
10190'
17-5/8" CSG, 29.7#, L-80, 10" 6.875"
1 0307'
DA TE REV BY COMMENTS
10131/01 ORIGINAL COMPLETION
12/23/01 CWS/tlh ADD ÆRFS
02104/04 CMO/TLP ÆRF SUMMARY CORRECTION
04/03/04 JLG/KAK SQUEEZE ÆRFS
06126104 DBM/KA CEMENT SOZ
07/03/04 RWLlKA GLV ClO
DATE
07/10/04
06/25/05
07/13/05
E-102
. SAÆTY NOTES:
---J
991' HTAMPORTCOLLAR
2179' -15-1/2" HES X NIP, 10 = 4.562" I
4686' -l5-1/2" X 4-112" TBG XO, ID" 3.958" I
REV BY COMMENTS
MDCfKA REÆRFS
TWSIPJC GLV ClO
RWLlTLH GL V ClO
4704' -14-112" X 5-112" TBG XO, ID" 4.892" I
-15-1/2" X 4-112" TBG XO, 10" 3.958" I
-14-1/2" HES X NIP, 10" 3.813" I
9791' -i 7-5/8" X 4-1/2" BKR 8-3 PKR. 10" 3.875"
9815' -14-112" HES X NIP, 10=:3.813" I
9836' -14-1/2" HES XN NIP, 10" 3.725" I
9849' -14-112" WLEG. ID" 3.958" I
9915' -¡20' PUPJTW/RA RAG I
MIDNIGHT SUN UNrr
WELL: E-102
ÆRMrr No: 2011860
API No: 50-029-23042-00
SEC 6, T11 N, R14E. 4962' FSL & 500' FEl
BP Exploration (Alaska)
e
e
MICROFilMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc
Schlumberger
Schlumberger-DCS
2525 Gambel! St, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
E-102 :.t (.I \.., ~ ~
E-102 J..t.) -t y", .
V-105 ) OJ... - /3l
W-212 :~ ú.l. -. t¡~;'
W-207J~j$ .. t,lr,
Job#
10708040 SBHP SURVEY
10672378 PPROF W/DEFT/GHOST
10687690 INJECTION PROFILE
10679053 INJECTION PROFILE
10703968 INJECTION PROFILE
NO. 3462
Company:
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Log Description
Field: Borealis
Midnight Sun
Polaris
Date BL Color CD
12/10/03 1 -.
05/01/08 1
06/26/04 1 V(c..
01/28/04 1 t.\lc,
01/26/04 1 tfi j c-.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
Dale Delivered: ) ( ~ 'àJJ~ \
08/30105
~o t-I~~
-'
Schlumberger-DCS
2525 Gambel! St, Suite 400
Anchorage, AK 99503-2838 1
ATTN, Beth &1/ ( UI! J I /
Received by: ~ ~W
;;jC/\NNET' SEP n 7 2005
.--
E-I02 (PTD# 2011860) Classified as Problem Well
) )
Subject: E-I02 (PTD# 2011860) Classified as Problem Well
From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>
Date: Wed, 06 Ju12005 10:31 :57 -0800
T~: "Wellman, Taylor T." <taylor.wellman@BP.com>, "GPB, GCI Area Mgr"
<GPBGCITL@BP.com>, "Rossberg, R Steven" <RossbeRS@BP.com>, "NSU, ADW Well
Operations Supervisor" <NSUADWW ellOperationsSupervisor@BP .com>, "GPB, Wells Opt Bng"
<(JPBWellsOptEng@BP.com>, "AOGCC Jim Regg (E-mail)..<jim_regg@admin;state.ak.us>.
"AOGCC Winton Aubert (E~mai1)" <winton_aubert@admin.state.ak.us>, "NSU, ADW .WL &
Completion Supervisor" <NSUADWWL&CompletionSupervisor@BP.com>, "GPB, Ops Mgr"
<GPBOpsMgr@BP.com>, "GPB, GCI Wellpad Lead" <GPBGCI WellpadLeac.l@BP.com>,"GPB,
Well Pads .CEK-N2" <GPBWellPadsCEK~N2@BP.com>
Cç;: "Julian~Jennifer Y"·<JulianJY@BP.com>, "NSU',ADW Well Integrity Engineer"
<NSUADWWellIntegrityEngineer@BP~com>, "Winslow, Jack L." <Lyonsw@BP.com>
All,
Well E-102 (PTD #2011860) has sustained casing pressure on the IA and is classified as a Problem
well. TIO's on 07/04/05 were 2290/2020/0 psi. The well failed a TIFL on 07/02/05.
The plan forward for this well is as follows:
1. DHD: TIFL- FAILED
2. SL: Run DGL V w/ ext packing in sta#1, drift for patch
3. DHD: Re-TIFL
Attached is a well bore schematic. Please call with any questions.
«E-102.pdf»
Thanks,
Donald Reeves - Filling in for Anna Dube
Well Integrity Engineer I
907-659-5102
907 -659-5100 #1923 pgr
SCANNED AUG 0 f) 2005
Content-Description: E-I02.pdf
E-l 02.pdf i Content-Type: application/octet-stream
Content-Encoding: base64
Preçsì/~ ~
set ,L1JVP ~~ Jvl£ì'Y. P
( Z- èC¡o f")' I iic f-er CcAq¿
:k- Zc) -Zo ~I b[ÇJDr: ZH. ~c:2c JK'eý1
Ol~ LJ .rs~ 3'7tJJf9 D 7(27 {DS·
1 of 1
7/18/2005 12:38 PM
TREE :::
WELLHfA [) ::::
ACTUATOR ~
KB. ELi:v"~
BF.<"ELIŸ =
'KOP=
rv1axÄngiËi =
"""" ....""..""" .....".
Datum MD =
'ÖatUm rvO;
5-1/8" FMC
FMC
NA
64.11'
<>··"·''''''''34'.'91·~'
900'
45@436i'
.. ... ,.. ···1Ó676;
SOSÖ' SS
) ) SAFETY NOTES:
E-102
- =--1 991' 1--1 TAM PORT COLLAR I
-
I I 2179' 1--15-1/2" HES X NIP, 10 = 4.562" I
I 10-3/4" CSG, 45.5#, L-80, 10:: 9.950" 1--1 4422' r-J
~
,
4686' 1-15-1/2" X 4-1/2" TBG XO, 10 == 3.958" I
Minimum ID = 3.725" @ 9836'
4-1/2" HES XN NIPPLE
--L
GAS LIFT MANDRELS
(STI MD I TVD1 DEVI TYÆ I VLV lLATCHj PORT DATE I
1 4696 3925 40 CA SO BK 24 06/26/05
4704' 1--14-1/2" X 5-1/2" TBG XO, ID == 4.892" 1
15-1/2" TBG, 17#, L-80, .0232 bpf, ID::: 4.892" J-t 9759'
ÆRFORA TION SUMMARY
REF LOG: SPERRY -SUN MWO ON 10/31/01
ANGLE AT TOP PERF: 30 @ 10006'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 10006 - 10036 S 06/26/04
3-3/8" 6 10058 - 10082 0 07/10/04
3-3/8" 6 10094 - 10124 0 07/10/04
\ , 9761' 1--15-1/2" X 4-1/2" TBG XO, ID = 3.958" I
9771' 1--14-1/2" HES X NIP, 10::: 3.813" 1
:8: ~ 9791' 1--17-5/8" X 4-1/2" BKR S-3 PKR, ID = 3.875"
} \ 9815' 1-f4-1/2" HES X NIP, 10 = 3.813" 1
9836' 1--14-1/2" HES XN NIP, 10 = 3.725"1
9849' 1--14-1/2" WLEG, 10 == 3.958" I
.t 9915' 1--120' PUP JT W/RA RAG I
14-1/2" TIP, 12.6#, L-80, .0152 bpf, 10::: 3.958" 1--1 9847' J
I PBTD l-i 10190' I
17-5/8" CSG, 29.7#, L-80, ID = 6.875" H 10307' ~...
DATE REV BY COMMENTS DATE REV BY COMMENTS
10/31/01 ORIGINAL COMPLETION 06/26/04 DBrvvKAK CEMENT SOZ
12/23/01 CWS/tlh ADD PERFS 07/03/04 RWUKAK GLV CiO
02/04/04 CMO/TLP PERF SUMMARY CORRECTION~ 7/1/0/04 MDC/KAK REÆRFS
04/03/04 JLG/KAK SQUEEZE ÆRFS 06/25/05 TWS/PJC GLV C/O
04/08/04 JLJ/KAK GLV C/O
06/14/04 RWLlKAK GLV C/O
MIDNIGHT SUN UNIT
WELL: E-102
ÆRMIT No: "2011860
API No: 50-029-23042-00
SEC 6, T11 N, R14E, 4962' FSL & 500' FEL
BP Exploration (Alaska)
Schlumberger
Schlumberger-DCS
2525 Gambell 51, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
;202-0~
/) A4't ;1'_"7 MPS-21
d'-vV - 'er----MPE-25 L1
'" 6'1./1'':< - MPG·19
~ J. . ~PB-27
ßLD I. - 2-J.1. MPE-25A
/1£)4- ,rì~. ~~ MPC-42
./- V . E-102
ß.o'f-02,(/
;¿o(- / <g{;
Well
10670013
10687675
10900120
10964102
10703992
10830797
10672379
Job #
Log Description
MEM CBL
CBL
SCMT
SCMT
SCMT
SCMT
RST
05/03/04
03/30/04
11/25/04
11/30/04
04/18/04
05/01/04
05/01104
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
Date Delivered:
?Ír£s
SCANNED JUN 1 7 2005
~(}'-/~6
02/22/05
NO. 3346
Company: Alaska Oil & Gas Cons Comm
Attn: Helen Wannan
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Milne Point
Midnight Sun
Date
Color
CD
BL
-
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789 rL
ATTN: Beth
\ ''d .
R'~¡C»« Id Úl<â>-f
ê
--
1. Operations Performed:
Abandon 0
Alter Casing D
Change Approved Program D
2. Operator
Name:
3. Address:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Repair Well 0 PluQ Perforations[KJ
Pull TubingO Perforate New PoolO
Operation Shutdown 0 Perforate I!]
4. Current Well Class:
Development ŒI
Stimulate 00 OtherD
WaiverD Time ExtensionO
Re-enter Suspended Well 0
5. Permit to Drill Number:
201·1860
6. API Number
50-029-23042-00-00
BP Exploration (Alaska), Inc.
64.11
8. Property Designation:
ADL-0028299
11. Present Well Condition Summary:
Total Depth measured 10315 feet
true vertical 8321.2 feet
Effective Depth measured 10190 feet
true vertical 8212.6 feet
P.O. Box 196612
Anchorage, AI< 99519-6612
7. KB Elevation (ft):
Casing
Conductor
Production
Surface
Length
80
10275
4372
Perforation depth:
ExploratoryD
Stratigraphic 0
9. Well Name and Number:
E-102
10. Field/Pool(s):
Prudhoe Bay Field / Midnight Sun 011 Pool
ServiceD
Plugs (measured)
None
Junk (measured)
None
~
Size
20" 91.5# H-40
7-5/8" 29.7# L-80
10-3/4" 45.5# L-80
TVD
36.0 - 116.0
32.0 - 8314.3
35.0 - 3773.4
MD
36 116
32 - 10307
35 - 4407
Burst
Collapse
470
4790
2480
1490
6890
5210
Measured depth: 10058 -10082, 10094 - 10124
5-112" 17# L-80 @ 29 4684
4-1/2" 12.6# L-80 @ 4684 4703
5-1/2" 17# L-80 @ 4703 9759
4-112" 12.6# L-80 @ 9759 9849
4-1/2" Baker S-3 Perm Packer @ 9791
RECEIVED
SEP - 3 2004
Alaska Oil & Gas Cons. Commission
Anchorage
True vertical depth: 8098.33 - 8119.09,8129.46 - 8155.41
Tubing ( size, grade, and measured depth):
Packers & SSSV (type & measured depth):
12. Stimulation or cement squeeze summary:
Intervals treated (measured): 10006' -10036'
Treatment descriptions including volumes used and final pressure: 20 Bbls 5% HCL @ 1750 psig /93 LARC Cement @ 3000 pslg
Representative Daily Averaae Production or Iniection Data
Gas-Me! Water-Bbl Casing Pressure
62.2 5053 893
17.2 1371 700
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Garry Catron
Printed Name Garry Catron
13
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys run _
Daily Report of Well Operations_
Oil-Bbl
1750
445
Tubing Pressure
1416
206
~
15. Well Class after proposed work:
ExploratoryD
16. Well Status after proposed work:
OilŒ] GasD
WAG 0 GINJD WINJD WDSPLD
Prepared by Garry Catron (907) 564-4657.
SUndry Number or N/A if C.O. Exempt:
304-093
Development Œ1
ServiceD
Title
Production Technical Assistant
Signature
Jj(~
8/30/04
Form 10-404 Revised 4/2004
Phone 564-4657
Date
OR' GINA L ABDMSBFL
SEP 0 :1 700~
E-102
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
06/25/04 MIRU CTU#5. KILL WELL WI 480 BBLS 2% KCL. RIH WI 2.5" BJDSN. TAG TO @ 10153'
OWN, CORRECT TO 10138'. PAINT FLAG @ 10128'. PUMP 20 BBLS OF 5% HCL
ACROSS PERF INTERVAL, FLUSH WI 50 BBLS KCL. RE-KILL WELL WI 240 BBLS KCL,
CAP WI 195 BBLS DIESEL. PUMP 93 BBLS TOTAL LARC CEMENT, 40 WI 10 PPB
AGGREGATE. PULL TO SAFETY. HESITATE/BUILD SQUEEZE PRESSURE TO 3000 PSI.
HOLD 3000 PSI SQUEEZE PRESSURE 60 MIN'S. FINAL 10 MIN LEAK OFF WAS 41 PSI.
ESTIMATE 15 BBL BEHIND PIPE. BLEED WHP TO +500 PSI. DROP 7/8" BALL.
CONTAMINATE FROM 6520' @ 1:1 TO TO @ 10138'. JET FROM TO TO 6520'.
CONTINUED ON 06/26/04 WSR.
06/26/04 Kill well w/480 bbls 2% KCL. RIH wI 2.5" BJDSN. Tag TO @ 10153' dwn, correct to 10138'.
Paint flag @ 10128'. Pump 20 bbls of 5% HCL across perf inerval, flush wI 50 bbls KCL. Re-
kill well wI 240 bbls KCL, cap with 195 bbls dieel. Pump 93 bbls total LARC cement, 40 wI 10
ppb aggregate. Pull to safety. hesitate/build squeeze pressure to 3000 psi. Hold 3000 psi
squeeze pressure 60 min's. Final 10 min leak off was 41 psi. Estimate 15 bbl behind pipe.
Bleed WHP to +500 psi. Drop 7/8" ball. Contaminate from 6520' @ 1"1 to TO @ 10138'. Jet
from TO to 6520'. Cement squeeze 10006'-10036'.
07/01/04 *** WELL SHUT IN UPON ARRIVAL **. - MONITOR WEATHER - DID NOT RIG UP TO
WELL DO TO WIND SPEED..
07/02/04 *** WELL SHUT IN UPON ARRIVAL*** (POST SQZ). DRIFTED WI 33/8" DMY
GUN,TEL,SB. LOC TT @ 9824'SLM. 9849'MD (CF = 25' +2) TAGGED FILL @ 10,109'SLM.
CORRECTED TAG DEPTH = 10,136'. NO SAMPLE RECOVERED. SET 4.5" WHIDDEN
CATCHER @ 9806'SLM.. PULL DGLV W/BK FROM STA #1 4681'SLM. I RUN 4.5"
BRUSH AND BRUSH GLM ***CONTINUED ON 7/03/04 WSR***
07/02/04 T/I/O= 100/800/300. TEMP=SI. (FLUID LEVEL, WIRELlNE). TBG FL @ 60'.
07/03/04 BRUSH & FLUSH INITIAL PRESSURES TIIIO 250/550/280 ATTEMPT TO PUMP DOWN
TBG, LOCKED UP @ 2500# SID FORMATION IS SQUEEZED OFF BLED PRESSURES
BACK & RID FINAL PRESSURES TIIIO 250/550/280 PUMPED 10 BBLS DEAD CRUDE.
07103/04 Change out Station 1
07/08/04 T/I/O=290/720/280. (FOR E/L). TEMP SI. TBG FL @ 1140'.
07/10104 PERFORATE 54' IN TWO INTERVALS WITH 3-3/8" POWERJET 3406 HMX 6 SPF GUNS.
10094-10124 FT ALL SHOTS FIRED
10058-10082 FT ALL SHOTS FIRED
NOTIFY PAD OPERATOR TO POP WELL. WELL LEFT SHUT-IN
FLUIDS PUMPED
BBLS
961 2% KCL
20 5% HCL
195 Diesel
93 LARC Cement
145 1.5# Bio
457 2% KCL wI XS
120 Methonal/W ater
46 Fresh Water
Page 1
TREE =
5-1/8" FMC
WB.LHEAD = FMC
ACTUA.TOR = NA
KB. ELEV = 64.11'
BF. ELEV = 34.91'
KOP= 900'
Max Ange = 45 @ 4367'
Datum MD = 10076'
Datum TVD = 8050' SS
E-1 02
10-314" CSG, 45.5#, L-80, ID = 9.950"
Minimum ID = 3.725" @ 9836'
4-112" HES XN NIPPLE
-I
991'
I SAFETY NOTES:
H TA M PORT OOLLAR I
5-112" I-ES X NP, ID =4.562"
5-1/2" X4-1/2"TBG XO, D =3.958"
5-1/2"TBG, 17#, L-80, .0232 bpf,lD =4.892"
9759'
4-1/2" TIP, 12.6#, L-80, .0152 bpf, ID = 3.958"
9847'
PERFORATION SUMM/\ RY
REF LOG: SPERRY-SUN MND ON 10/31/01
ANGLE A TTOPPERF: 30@ 10006'
f\bte: Refer to Ftoductbn œ for historical perf data
SIZE SPF INTERv' AL OpnlSqz OA. TE
3-318" 6 10006 - 10036 S 06l26t1J4
3-318" 6 10058 - 10082 0 0711 OtIJ4
3-318" 6 10094-10124 0 0711 OtIJ4
10190'
7-5IfS' CSG, 29.7#, L-80, D = 6.875"
10307
2179'
4686'
4704'
9761'
9771'
9791'
9815'
9836'
9849'
9915'
DATE REV BY COMMENTS OA. TE REV BY OOMMENTS
10/31/01 ORIGINAL COMPLETION 04t1J3/O4 JLGlKAK SQUEEZEPERFS
11/28/01 CI-HP OORRECTIONS 04t1J8/O4 JLJlKAK GLV C/O
12/23/01 Cv'VSltlh ADD PERFS 06/14/04 FmUKAK GLV C/O
04/08/03 DRSlTP 1V DIMD CORRæTONS 06/26/04 DBM'KAK CEMENT SQZ
02/04/04 Ov1O1TLP ÆRF SUMM/\RY OORRECTION~ 07t1J3/O4 FmUKAK GLV CIÛ
03/16/04 J...J/TLP GL V C/O 7/1/0/04 MDOKAK REÆRFS
4-1/2" X 5-1/2" TBG XO, ID = 4.892"
4-1/2" I-ES X NP, ID = 3.813"
7-5/8" X 4-1/2" BKR S-3 A<R, ID = 3.875'
4-112" I-ES X NP, ID = 3.813"
4-112" He; XN NlP,ID = 3.725"
4-1/2" WLEG,ID= 3.958"
2O'RJPJTW/RA. RA.G
MDNGHr SUN UNIT
WB.L: E-102
ÆRMIT No: 2011860
API No: 50-029-23042-00
SEC6, T11N, R14E, 4962' FSL &500' FB.
BP EXploration (Alaska)
/'
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
W4f, Jfl..'5fl..OO'f
O~ :J1l.S(~
1. Type of Request: 0 Suspend 0 Operation Shutdown 0 Perforate IX] WaiverO Annular Disposal D
Abandon
Alter CasinQ 0 Repair Well 0 PluQ Perforations 00 StimulateŒ Time ExtensionD OtherD
Change Approved Program 0 Pull Tubing 0 Perforate New Pool 0 Re-enter Suspended Well 0
2. Operator
Name:
4. Current Well Class:
BP Exploration (Alaska), Inc.
Development Œ]
Exploratory 0
5. Permit to Drill Number:
201-1860 /'
P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
64.11 KB
8. Property Designation:
ADL-0028299
11.
Total Depth MD (ft):
10315
Casing
Stratigraphic 0 Service 0
9. Well Name and Numger:
E-102/
10. FieldlPool(s):
Prudhoe Bay Field / Midnight Sun Oil Pool
PRESENT WELL CONDITION SUMMARY
I Total Depth TVD (ft): IEffective Depth MD (ft): Effective Depth TVD (ft):
8321.2 10190 8148.5
Length Size MD TVD
6. API Number /
50-029-23042-00-00
3. Address:
/'
Plugs (md):
None
Junk (md):
None
Burst
Collapse
Conductor 80
Production 10275
Surface 4372
Perforation Depth MD (ft): I
10006 - 10036
10058 - 10082
10094 - 10124
20" 91.5# H-40
7-5/8" 29.7# L-80
10-3/4" 45.5# L-80
Perforation Depth TVD (ft):
8053 8079.3
8098 8119.1
8129 8155.4
top bottom top bottom
36 116 36.0 116.0 1490 470
32 10307 32.0 8314.3 6890 4790
35 4407 35.0 3773.4 5210 2480
Tubing Size: Tubing Grade: Tubing MD (ft):
4.5 " 12.6 # L-80 4684 4703
4.5 " 12.6 # L-80 9759 9849
5.5" 17# L-80 29 4684
5.5" 17 # L-80 4703 9759
Packers and SSSV MD (ft):
9791
Packers and SSSV Type:
4-1/2" Baker S-3 Perm Packer
12. Attachments:
Description Summary of Proposal ŒI
13. Well Class after proposed work:
Detailed Operations Program ŒI
BOP Sketch 0
ExploratoryO
DevelopmentR]
Service 0
14. Estimated Date for April 7, 2004 /
Commencing Operation:
16. Verbal Approval: Date:
Commission Representative:
15. Well Status after proposed work:
Oil!!] GasD PluggedD AbandonedD
WAG D GINJD WINJD WDSPLD
Prepared by Garry Catron 564-4657.
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name
Signature
d;;w:;.fL~
Title
Phone
Contact Alex Yancey
Petroleum Engineer
564-5092
3/18/04
Commìssion Use Only
Conditions of approval: Notify Commission so that a representative may witness
I Sundry Number:
301-{)ß
Plug Integrity D
Mechanciallntegrity Test 0
Location Clearance D
Other:
Subsequent
¡,:r: ~ C. ~ , i, J r:... f~'"~
k.- '-'i' '- V r: i~/
BY ORDER OF MAR 2 A 2O0ðt
THE COMMISSIO~ Date: ð.. ¡;s-,...
^~>" :;;:¡ in i ¡i~,; ;';0"'; ¡;I!,.".,i~liion
OR\G\t\'At-
.!j,r;"""'ìr';::'~
.... SF L
.SolDO'
Form 10-403 Revised 12/2003
SUBMIT IN DUPLICATE
bp
...
"".",.
....,~ ~..-
~..- ~..'"
4ì\ F".
.'1"'1\-
".
Memorandum
To: J. Smart/D. Cismoski Date: March 18,2004
GPB Well Ops Team Leaders
PECT: MDEPDWL02-N
From: Alex Yancey - E Pad Production Engineer NRWO_CMT SOZ
Kevin Yeager - Wells Engineer NRWO_REPERF
Est. lOR 750 bopd
Subject: E-102 CT NRWO Est. Cost: $140,000
1.
2.
3.
C
S
E
FCO, HCI wash, Cement Squeeze
Drift as appropriate for 3-3/8" gun. C/O DGLV with live GLV.
Reperf - 54'.
10,058 - 10,082' md
10,094 -10,124' md
54'
3-3/8" HSD PJ
6SPF
Current Status:
Last test:
Max. Deviation:
Minimum ID:
Last Tag TD:
Last Downhole Op:
Latest H2S value:
Shut-in Producer
2/23/04: 655 bopd, 34.5 mmscfd, 53,100 GOR, 81 % WC
45Q @ 4367' md
3.725" -10 of 4-1/2" XN Nipple @ 9836' md
10,105' md 12/10/03 wI SBHPS
12/10/03 SBHPS
N/ A - 10 ppm is highest on pad
E-102 is part of the Midnight Sun field drilled into the Kuparuk formation from E Pad. The field development plan was
to have three water injection wells and two producers. E-101 and E-103 were the original producers and E-100, E-102,
and E-104 were the original injectors. E-102 and E-103 were drilled within a month of each other. They were both
tested and E-102 came in at 7200 bopd with a GOR of 820 scf/bbl. E-103 tested at 1300 bopd with a GOR of 30,000
scf/bbl. E-103 was tested for failures in the completion, but none were ever found. The reservoir development plan
was changed and E-103 became the injection well and E-102 stayed on as the producer.
E-102 was drilled to be an injector well. The original perforation plan was to maximize the injectivity which was
accomplished by perforating the best quality rock. This included the top of the Kuparuk formation where there is high
permeability rock and the original gas cap. Initially this was not an issue, but as the well has progressed in life, a
production log from August 2002 indicated that the top 14' of this interval is responsible for almost all the gas entry.
Following the cement squeeze, the lower zones will be reperforated over the current intervals. This decision came as a
result of two main factors. The reservoir model indicates that the upper zones will be flooded with water as injection
continues. Also, logs have indicated that there are no shales, but the zones selected for reperforation are bounded with
tighter and denser rock.
The well has been set up to permanent PBGL from E-07A and still has temporary access to the E-10AlE-34 flowline.
For questions or comments please call Alex Yancey at 564-5092 or 522-2539 (h) or 301-3019 (c) or Kevin Yeager at
564-4387 or 632-3447(c).
cc:
w/a:
Well File
A. Yancey
K. Yeager
E-102 FCD - Acid Wash - Cement Sqz. - Re Perf
Prepared By: Kevin E. Yeager
Phone#: 564-4387 (w) 632- 3447 @
JOB PLANNING DETAllS:
Perf angle:
30 deg
Gas Lift Design:
03/16/04 - 5L dummied off GLV. TIFL perfonned
TD Tag History:
12/10/03. SL tagged @ 10105', identical SL tag dated 8/13/03.
19'ofbottom perf zone covered
Displacement:
232 bbls to the top perf (tubing = 228 bbls, 7 5/8" liner = 4 bbls)
Static:
12/10/03 -3066 psi @ 160 deg
02/23/04 - 655 bopd, 2740 bwpd, 53.1 mm GOR, 1586 FTP 108 FWT
Well Test
CTU Fill Cleanout:
1. Hold PJSM. RU CT, PT & RIH with stinger and nozzle. Fluid pack well as necessary.
2. Dry tag bottom. Flag coil.
3. Clean out fill to 10150' - approximately 26' below bottom set of perforations.
4. Tag fill to confinn accurate depth clean out.
CTU Acid Work:
1. Bullhead kill well. RIR & tag PBTD. Pull up 10' and flag coil.
2. RU surface acidizing equipment and pump the following down the coil, reciprocating across upper
perf interval from 10006' - 10036'. Make sure well is fluid packed and all gas is out of the wellbore.
Maintain a positive WRP. Pump 20 bbls 5 % RCL as follows:
. Establish Injectivity
. 5 bbls 1 % KCL spacer
. 20 bbls 5 % HCL - 10% Xylene
. 60 bbls 1 % KCL flush to evacuate coil and displace acid into perforations.
HCL Acid Additives & Concentrations:
0.6% A261 + 4 ppt A179 + 8 ppt A153 + 0.2% F1O3 + 20 ppt L58 + 0.5% W54 + + 0.5% W60 + 1.5%
U74.
CTU Cement Work:
1. Design Latex cement slurry and perform lab tests as per attachment "A".
2. RU cementing equipment and batch mix have nozzle above 10006' (top perD and slowly
reciprocate.
3. Mix 25 bbls pump able Latex cement.
4. Catch a sample of the cement for QC testing. Once the blend is approved, line up the cementers down
the coil.
~
Note: Insure well is not on a vacuum and pump fluid as necessary to achleve a posltlve WffP prwr to
pumping cement. Do not proceed with squeeze unless the tubing is liquid packed and gas free.
Monitor lAP; cap the backside with crude if necessary for positive WHP.
5. Pump the following down the coil:
.
10 bbls spacer water
25 bbls Latex cement (Attachment "A")
One coil volume of spacer water
1.5 # biozan gel to cleanout cement
.
.
.
6. RIH to flag and reciprocate coil as cement reaches nozzle.
7. As cement reaches nozzle, open choke and monitor returns. Do not pull up hole until 2 bbls pumped
out the nozzle. After 2 bbls pumped out the nozzle pull uphole, take returns until nozzle is above
perforations, then close choke and squeeze until initial squeeze pressure (1000 psi bump) is observed,
then close chokes and lay in any remaining cement.
8. Pull up hole at maximum speed to safety.
9. Continue to walk squeeze pressure up to a target of 3500 DP at the perforations in 500-psi
increments, holding each increment for 5-10 minutes. Maintain 3500 psi for one hour.
10. After 1 hour at 3500 psi slowly bleed WHP down to 500 psi.
II. Swap to 1.5 # biozan and launch ball. Chase ball to nozzle the RIH at 1.1 jetting at max CT pressure
and cleanout to previous TD.
12. Take barrel count to insure 1: I returns.
13. Switch to friction reducer fluid if desired. Make 3 down and 2 up passes from TD to tubing tail.
14. Jet up hple at 80% running speed and max coil tubing pressure. Slow down and completely wash all
jewelry jetting to insure all cement is removed.
15. Freeze protect to 2500' of well bore.
16. RD CTU leaving 500 psi on wellhead.
Post SQueeze SL:
1. After 3 days WOC tag TD and install gas lift valve per GL engineer's design.
2. Unload, perform inflow test by opening well to flowline and shoot FL. Do not pressure test squeeze.
Post SQueeze e-line:
I. Shoot perf interval per the attached program. POP well.
~ .' ,~
TREE =
W8.LHEAD =
ACTUA. TOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
DatumTVD =
5-1/8" FMC
FMC
NA
64.11'
34.91'
900'
45 @4367'
10076'
8050' SS
I 10-3/4" CSG, 45.5#, L-80, ID = 9.950" H 4422' r--J
Minimum ID = 3.725" @ 9836'
4-112" HES XN NIPPLE
15-1/2"TBG, 17#, L-80, .0232 bpf,lD =4.892" H 9759' I
4-1/2"TTP,12.6#,L-80,.0152bpf,ID=3.958" H 9847' I
PERFORATION SUMMA. RY
REF LOG: SPffiRY-SlJoJ MND ON 10/31/01
ANGLEATTOPPffiF: 30@ 10006'
N::>te: Refer to A"oductbn œ for historical perf data
SIZE SPF INTER\! AL OpnlSqz DA TE
3-3/8" 6 10006-10036 0 12/19101
3-3/8" 6 10058-10082 0 12/18101
3-3/8" 6 10094-10124 0 12/18101
~ 10190' I
17-5/8" CSG, 29.7#, L-80, D = 6.875" H 10307 I
DA1E
10131/01
11/28/01
12/23/01
04108/03
02104104
COMWENTS
ORIGINAL COMPLETION
CHrrp CORRECTIONS
ONSltih ADD ÆRFS
DRSlTP TVD/WÐ CORRECTIONS
CWOrrLP PffiF SUM'v1ARY CORRECTIONS"
DATE
REV BY
E-102
-
-
z
]æ8
REV BY
=---1
I
~
991'
2179'
I SAFETY NOTES:
HTAMPORTCOLLAR I
H5-1/2" I-ESXNP,ID=4.562" I
4686' H5-1f2" X4-1/2"TBG XC, D =3.958" I
L
-
GAS LIFT MA f\ÐRELS
ISTI WÐITVDIDBII TYPE I VLV ILTCHIRJRT DA1E I
1 4696 3925 40 KBG2 RP BK-5 SHRD 10/31/01
"
~
I
,
COM'v1ENTS
4704'
9761'
9771'
9791'
9815'
9836'
9849'
9915'
H4-1/2" X 5-1/2" TBG XC, ID = 4,892" I
H5-1/Z' X4-1/2"TBGXO, ID= 3.958" I
H4-1/z' I-ES X NP, ID = 3,813" I
H7-5/8" X4-1/2"BKRS-3 A<R,ID =3.875' I
H4-1/Z' I-ES X NP, ID = 3.813" I
H4-1/Z' HE> XN f\lP,ID = 3.725" I
H4-1/Z' WLEG,ID= 3.958" I
H2o' RJPJT W/RA RAG I
MDNlGHT SlJoJ lJoJlT
WELL: E-102
ÆRMT N::>: 201-1860
API N::>: 50-029-23042-00
SEC6, T11N, R14E4962' FSL& 5O0'FEL
BP Exploration (Alaska)
Schlumberger
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Well
Job#
10563054
10687642
10708040
10684302
10563448
Log Description
SBHP SURVEY
RSTIGRAVEL PACK
SBHP SURVEY
DDL
MCNUSIGMA
Date
04/30/03
09/07/03
12/10/03
08/29/03
05/20/03
NO. 3079
Company:
Field:
BL
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
RECEIVED
\'.1 ~ 'j 1 &\ ~iîO4
. " o~í.;
Date Delivered:
'R~b\\"'~
.,¡':;"i'~¡; ;f";,í.:a5CClI:j.,Comm~~.¡~~p
, 2.' "" "..
¡:,~rt",)rage
12/18/03
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Midnight Sun
Prudhoe Bay
Endicott
Sepia
CD
1
1
1
1
1
1
If)rrl'575
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
A TTN: Beth
Rece;ved ~ 1:'\ \ ~: ~~.;., <YV"\.
18 JM- ;LòaL(
DATA SUBMITTAL COMPLIANCE REPORT
1/6/2004
Permit to Drill 2011860
Well Name/No. PRUDHOE BAY UN MDS E-102
Operator BP EXPLORATION (ALASKA) INC
MD
10315 ~ TVD
8321 ./
Completion Date 12/18/2001 ~ Completion Status
1-01L
Current Status 1-01L
S>¡t~ / ì D It- ~~ "'(
API No. 50-029-23042-00-00
UIC N
-----------~- ~
--- - - -- --- - --
REQUIRED INFORMATION
Mud Log No
Samples No
No
Directional Survey
~-----~ ------'
------- - -----
DATA INFORMATION
'"--""'1160 5
Log Log Run
Scale Media No
1
1
Blu
1
1
(data taken from Logs Portion of Master Well Data Maint)
-~-
Interval OH I
Start Stop CH Received Comments
--- --~-- --
71 10243 Case 6/13/2002
71 1 0243 Case 6/13/2002
9900 10103 Case 8/30/2002
114 10315 Case 3/5/2003
9900 10103 Case 8/30/2002
9900 10103 Case 8/30/2002
9900 10103 Case 8/30/2002
9900 10103 Case 8/30/2002
9758 10018 Case 1 0/8/2003
9758 10018 Case 10/8/2003
digital well logging data
Static Temp/Pressure -
PBMS: GRffemp/Pressure :
Static Temp/Pressure-
PBMS: GRffemp/Pressure .
--~---- --- --- - - . - ,J
----~
Types Electric or Other Logs Run:
Well Log Information:
Logi Electr
Data Digital Dataset
Type MedlFrmt Number Name
f::' D ue943 ~::;~::::~~
I Log -
[jÆ6 C
I
VCog
)(L09
kog
cUog
Jæg
I
u.. Log
I
I
...... -' . .. .
. ..
..--...- . ..."-" .
Prodûctiøh ."..'.'
5
1
1
1
1
1
1
5 Blu
5 Blu
5 Blu
5 Blu
5 Blu
5 Blu
Well CoreslSamples Information:
Name
Interval
Start Stop
Sent
ADDITIONAL INFORMATION
Well Cored? Y ~
Chips Received? -=- y ~
Analysis
Received?
Received
Sample
Set
Number Comments
.~
Formation Tops
Daily History Received?
ÐN
@N
Comments:
DATA SUBMITTAL COMPLIANCE REPORT
1/6/2004
Permit to Drill 2011860
Well Name/No. PRUDHOE BAY UN MDS E-102
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23042-00-00
MD
10315
TVD 8321
Completion Date 12/18/2001
Completion Status
1-01L
Current Status 1-01L
UIC N
Compliance Reviewed By: ~ Date: - ~ J ~~u --- --
-'>
-~
10/8/2003
Sc~lußlbepgep
NO. 2986
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Aurora
Midnight Sun
.-.~
Well
Job#
Log Description
Date
BL
Color
CD
E-102 ~~ ~ '- \ ~(1J STATIC TEMP/PRESSURE 04/02/03 1
S-103 ~--1 l()9( PSP PRODUCTION PROFILE 09/08/03 1
1./
S-106 ~n \ '-0\ ~ GAS LIFT SURVEY 08/21/03 1
S-1 08 ~\ - \ ~'r"\ LEAK DETECTION LOG 09/08103 1
-.;;;;:;¡¡r .
--'0
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1~_xp r::: t~ t: ,\¡~ ~ D
900 E Benson Blvd. (,~ ~"'; ~~7 ~ ï¡ w ~
Anchorage AK 99508-4254
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
ATTN: Beth
OCT 08 2003
Received b~D\-9 ~ r"~' C'út>- ~ ~j~
Date Delivered:
£1""':"~ ,.00-' <; i~>V'- i'~"""'~ (""'~~' .
r U:a"i\""""11 "'" "->"--"->" =";:.;;,. . ~ H¡ì:fIil~~n
r;[¡C-nOrf!jg~~
~ ~ ~ \'..f"'\ . ~
(
f
dO/~1 ~~
/ I toO '5
WELL LOG TRANSMITf AL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn. : Lisa Weepie
333 West 7th Avenue, Suite 100
i\nchorage,Alaska 99501
March 04,2003
RE:
MWD Fonnation Evaluation Logs: E-102 MIDNIGHT SUN,
AK-MM-11169
E-IO2 MIDNIGHT SUN:
Digital Log Images:
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling SeIVÌces
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
MAR 0 5 2003
Alaetœ Oit & Gas Cons. Comml8eion
Anchmge
8/26/2002
Schluntbergel'
Well
Job#
Log Description
NO. 2356
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Midnight Sun
Prudhoe Bay
Date Color Sepia BL CD
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
PRODUCTION PROFILE
22362 RST-SIGMA
22387 RST-SIGMA
08/13/02
07/29/02
08/11/02
1
1
1
1
1
.>~-
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
Date Delivered:
RECEIVED
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
A~ B~
R'œi~d '- - - . -~
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
---='"
AUG!e 2002
Alaska oa & Gas Cons. Commission
Anchorage
(
(
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
OA CEMENT SQZD
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
Operation shutdown-
Pull tubing -
317' FNL, 501' FEL, Sec. 06, T11 N, R14E, UM
At top of productive interval
420' FNL, 1424' FEL, Sec. 31, T12N, R14E, UM
At effective depth
317'FNL, 1434'FEL,Sec.31, T12N,R14E,UM
At total depth
255'FNL, 1440'FEL, Sec. 31, T12N,R14E,UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth:
measured
true vertical
Casing
Conductor
Length
80'
4372'
Size
20"
10-3/4"
7-5/8"
Surface
Production
10275'
Stimulate -
Alter casing -
5. Type of Well:
Development _X
Exploratory-
Stratigraphie-
SeNiee
(asp's 664448, 5976747)
(asp's 663393, 5981901)
(asp's 663380, 5982004)
(asp's 663373, 5982066)
10315 feet
8321 feet
Plugs (measured)
Plugging - Perforate -
Repair well _X Other -
6. Datum elevation (OF or KB feet)
RKB 64 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
E-102
9. Permit number / approval number
201-186
10. API number
50-029-23042-00
11. Field / Pool
Prudhoe Bay Field / Midnight Sun Pool
Measured Depth
115'
4407'
True Vertical Depth
115'
10190 feet
8213 feet
Junk (measured)
10307'
~") E'" ('" fwi . \ I - [
I~I" ... '~'m': ~¡¡' E ,J
Perforation depth:
measured Open Perls 10006' - 10036', 10058' - 10082', 10094' - 10124'
jl II '1 ( 'Î~q?
I L.:"~ 0 L U I"....
Cemented
260 sx AS (Approx)
898 sx AS Lite 3, 317 sx
Class 'G'
293 sx Class 'G'
true vertical Open Perls 8053' - 8079', 8098' - 8119', 8129' - 8155'
Alaska on [1 Gas Cons. GonUWSSIOi I
Anchorage
Tubing (size, grade, and measured depth)
5-1/2", 17#, L-80, Tubing @ 4686' MD. 5-1/2" x 4-1/2" XO @ 4686'.
4-1/2", 12.6#, L-80, Tubing @ 4704' MD. 4-1/2" x 5-1/2" XO @ 4704'.
5-1/2",17#, L-80, Tubing @ 9761' MD. 5-1/2" x 4-1/2" XO @ 9761'. TBG Tail @ 9849' MD.
7-5/8" x 4-1/2" Baker S-3 Packer @ 9791' MD.
5-1/2" HES X Nipple @ 2179' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Daily Averaae Production or Injection Data
Oil-Bbl Gas-Met Water-Bbl
6524 45339 1819
Packers & SSSV (type & measured depth)
Prior to well operation
06/22/2002
Subsequent to operation 06/26/2002
15. Attachments
Copies of Logs and Surveys run -
Daily Report of Well Operations Oil X Gas
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~J~ ~~ T;tle: Tech;cal Ass;stant
DeWavne R. Schnorr
6509
Form 10-404 Rev 06/15/88 .
Casing Pressure
Tubing Pressure
957
719
45258 1838
16. Status of well classification as:
(") ¡I~.',', P ("'\ ~ t\ ~ K!, ~
'I II I I) Ii i ,I ;1'\ 'I ! I;, 1:1
""" .." ':', ',' :', ' ,", "
Suspended
Service
Date July 12, 2002
Prepared by DeWayne R. Schnorr 564-5174
SUBMIT IN DUPLICATE
~
,
(
(
E-102
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
06/22/2002 ANN-COMM (AC-EVAL AND REPAIR): AC-EVAL
06/24/2002 ANN-COMM (AC-EVAL AND REPAIR): CEMENT SQUEEZE
EVENT SUMMARY
06/22/02
TIIIO = 1090/1580/200. INSTALLED 361 PVC PIPE IN CONDUCTOR (PRE TOP
CEMENT JOB, AOGCC REQUEST). INSTALLED 361 OF 3/411 PVC PIPE IN
CONDUCTOR.
06/24/02
TOP CEMENT JOB 2011 CONDUCTOR BY 9-5/811 SURFACE CASING WITH 32
BBLS OF 15.7 PPG ARCTIC SET ONE CEMENT.
FLUIDS PUMPED
BBLS
20 FRESH WATER
32 ARCTIC SET I CEMENT @ 15.7 PPG
52 TOTAL
Page 1
1&
TREE =
5-1/8" FMC
(
WB...LHEAD = FMC
ACTUA. TOR = NA
KB. ELEV = 64.11'
BF. ELEV = 34.91'
KOP= 900'
Max Ange = 45 @ 4367'
Datum MD =
Datum1VD = 8800' SS
10-314" CSG, 45.5#, L-80, ID = 9.950"
4422'
Minimum ID = 3.725" @ 9836'
4-112" HES XN NIPPLE
1 5-1/2" TBG, 17#, Lo80, .0232 bpf,lD =4.892" 1
9759'
1 4-1/2" TW, 12.6#, L-80, .0152 bpf, ID= 3.958" 1
9847'
PERFORATION SUM~ RY
REF LOG: ----------
ANGLE AT TOP ÆRF:
f\bte: Refer to A'oduction DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8' 6 10006 - 10036 0 12/19/01
3-3/8' 6 10058 - 10082 0 12/18/01
3-3/8' 6 10094 - 10124 0 12/18/01
1 FaTD 1
10190'
17-5/8" CSG, 29.7#, L-80, .0459 bpf, ID = 6.875" I
10307
E-102
---1
991'
2179'
4686'
4704'
9761'
9771'
9791'
9815'
9836'
9849'
9915'
DATE REV BY CO rvrv1 ENT S DATE R8/ BY CO rvTv1 ENTS
10/31/01 ORIGINAL COWLErION
11/28/01 CH'TP CORRECTIONS
12/23/01 CWS/tlh ADD PERFS
I SAFETY NO1ES:
HTA M PORT COLLAR I
5-lIZ' I-ES X NP, ID = 4.562"
5-1/2" X4-1/2"TBG XO, D =3.958"
GAS LIFT MA t\ORELS
D8/ TYPE VL V L TCH FORT DA TE
40 KBG2 RP BK-5 SHRD 10/31/01
4-112" X 5-1/2" TBG XO, ID = 4.892"
5-1/2" X 4-1/2" TBG XO, ID= 3.958"
-14-1/2"I-ES XNP, ID=3.813" I
-17-5/8" X 4-112" BKR S-3 A<R, ID = 3.875" I
4-1/2" I-ES X NP, ID = 3.813"
-i4-1/2" HES XN NIP,ID = 3.725" I
4-1/2" WLEG, ID = 3.958"
20' RJPJT W/RA RAG
FRLDHOE BA Y UNIT
WB...L: E-102
PERIv1ITNo: 201-1860
API No: 5Q-029-23042-00
SEC6, T11N, R14E4962' FSL &500' FB...
BP Exploration (Alaska)
,
c"
~,
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
J\nchorage,Alaska
June 06, 2002
RE:
MWD Formation Evaluation Logs
E-1 02,
AK-l\1M-] ] ] 69
] LDWG formatted Disc with verification listing.
PlPI#: 50-029-23042-00
¿;( DJ -I <6 GJ
fOcre.¡ 3
PLEASE ACKNOW,LEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE, TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
J\nchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Sîgn~ '-fYJ. ~
RECEIVED
JUN 1 3 2002
Alaska Oil & Gas Cons. Commi8i0n
Anchorage
~
J
( STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMI~SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
IBI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at su rface ,"-';:~ ,~.\'~> ,- ~-. ;-..-
4963' FSL, 501' WEL, SEC. 06, T11 N, R14E, UM (As-Built);,:' - ;' ;,- ~ .' ,
At top of productive interval ~ J 7 ,1. &' -, [;.."1
4859' NSL, 1424' WEL, SEC. 31, T12N, R14E, UM i) ._~.-:~ :,--.,'-" ;
At total depth ~:' - '~J' -' ,
5023' NSL, 1438' WEL, SEC. 31, T12N, R14E, UM \;;.~~:.:-~'~?,,::.-.;
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
RKB = 64.11' ADL 028299
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
10-17 -2001 10-28-2001 12-18-2001
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
10315 8321 FT 10190 8213 FT IBI Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, Gyro, P4 RES, PWD
23.
CASING
SIZE
20"
10-3/4"
7-5/8"
Classification of Service Well
. 'A-
t ~, ¡ i\.Jf'..J'
~ ~ V~8)
'-,.À-
r ~~¡~.;
- '. ,--,- '" ,
7. Permit Number
201-186
8. API Number
50- 029-23042-00
9. Unit or Lease Name
Prudhoe Bay Unit
1 O. Well Number
E-102
11. Field and Pool
Prudhoe Bay Field / Midnight Sun
15. Water depth, if offshore 16. No. of Completions
N/ A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2179' MD 1900' (Approx.)
WT. PER FT.
91.5#
45.5#
29.7#
GRADE
H-40
L-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
Surface 80' 30" 260 sx Arctic Set (Approx.)
35' 4407' 13-1/2" 98 sx AS Lite 3 317 sx Class 'G'
32' 10307 9-7/8" 293 sx Class 'G'
AMOUNT PULLED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
3-3/8" Gun Diameter, 6 spf
MD TVD MD TVD
10006' - 10036'
10058' - 10082'
10094' -10124'
8053' - 8079'
8098' - 8119'
8129' - 8155'
25. TUBING RECORD
SIZE DEPTH SET (MD)
5-1/2" X 4-1/2", 17# x 12.6#, 9849'
L-80
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 100 Bbls of Diesel
PACKER SET (MD)
9792'
27.
Date First Production
December 22, 2001
Date of Test Hours Tested
1/4/2002 0.5
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL-BBL
TEST PERIOD 2176
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
OIL -BBL
GAs-McF
3072
GAs-McF
WATER-BBL
36
WATER-BBL
CHOKE SIZE GAS-OIL RATIO
48.35 1412
OIL GRAVITY-API (CORR)
27.2
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RECEIVED
JAN 1. 4 ZÕÒZ
Alaska Oil & Gas Cons. Commission
.. .
Form 10-407 Rev. 07-01-80
~( U K I G ' \ A l!BOMS BFl
-
Jþ,N 2 4 2~bmit In Duplicate
('
(
30.
Formation Tests
29. Geologic Markers
Marker Name Measured True Vertical
Depth Depth
Top of Ugnu 5617' 4694'
Top of West Sak 7434' 6057'
Top of Colville Mudstone 8074' 6519'
Top of Kuparuk 9985' 8035'
Top of Miluveach 10138' 8168'
\nclude interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
RECEIVED
QJAN 1. 4 2002
Alaska Oil & Gas Cons. Commission
Anchorage
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys and Leak-Off Integrity Test.
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble Tille Technical Assistant
Date OJ. ILl-O
201~186
Permit No. I A roval No.
Prepared By Name/Number:
Sondra Stewman, 564-4750
E-102
Well Number
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and co!Teet well completiOn report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injectiOn, steam injection, air injection, sa~ water diSPOsal, waler supply tor injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate w\1ich elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this fonn and in any
attachments.
\TEM 16 ANa 24: II this well is completed lor separate production from more than one intelVaI (multiple completion), so stale in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separateiy produced. showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF. KB. etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Melt1od 01 Operation: Flowing, Gas Lift, Rod pump, HydrauliC Pump, Submersible, Waler Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none',
Form 10~407 Rev. 07-01~80
ORIG\NAl
Legal Name: E-102
Common Name: E-102
Test Date
10/23/2001
IestTyp~
I~t .. Dept!i(IMP)
4,442.0 (ft)
m~~Deptlj(JMp)
(ft)
LOT
=l.IrnmaIW
(ppg)
Surface Pressure
(psi)
Leak Off Pressure (BHP)
(psi)
Page 1 of 1
EMW
(ppg)
--""
~
Printed: 11/5/2001 10:49:10 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/15/2001
10/16/2001
10/17/2001
10/18/2001
10/19/2001
('
(
Page 1 of 5
BP EXPLORATION
Operations Summary Report
E-102
E-102
DRILL +COMPLETE
DOYON
DOYON 14
00:00 - 12:00
From - To Hours Activity Code NPT
PRE
12:00 - 14:00
14:00 -18:30
18:30 - 19:00
19:00 - 00:00
00:00 - 01 :30
01 :30 - 04:30
04:30 - 05:30
05:30 - 11 :00
11 :00 - 21 :30
21 :30 - 22:30
22:30 - 00:00
00:00 - 01 :00
01 :00 - 02:00
02:00 - 06:30
06:30 - 10:00
10:00 - 10:45
10:45 - 11: 15
11:15-12:30
12:30 - 13:00
13:00 -13:30
13:30 - 14:30
14:30 - 00:00
00:00 - 12:00
12:00 - 00:00
00:00 - 08:00
08:00 - 09:00
09:00 - 09:30
09:30 - 11 :30
11 :30 - 13:00
12.00 MOB
2.00 MOB
4.50 MOB
0.50 MOB
5.00 MOB
1.50 MOB
3.00 MOB
1.00 MOB
5.50 MOB
10.50 RIGU
1.00 RIGU
1.50 RIGU
1.00 RIGU
1.00 RIGU
4.50 RIGU
3.50 RIGU
0.75 RIGU
0.50 RIGU
1.25 DRILL
0.50 DRILL
0.50 DRILL
1.00 DRILL
9.50 DRILL
12.00 DRILL
12.00 DRILL
8.00 DRILL
1.00 DRILL
0.50 DRILL
2.00 DRILL
1.50 DRILL
Phase
P
P
P
P
P
PRE
PRE
PRE
PRE
P
P
P
P
PRE
PRE
PRE
PRE
P
PRE
P
P
P
P
PRE
PRE
PRE
PRE
P
P
PRE
PRE
P
P
PRE
PRE
P
SURF
P
P
P
SURF
SURF
SURF
P
P
SURF
SURF
P
SURF
P
SURF
P
SURF
P
P
P
SURF
SURF
SURF
Start: 10/16/2001
Rig Release: 10/31/2001
Rig Number:
Spud Date: 10/17/2001
End: 10/31/2001
Description of Operations
Prepare for rig move from D pad to E pad. LD top drive. Bridle
up. Raise and pin C section. Clear cellar. Jack floor. Move
off well. Spot floor to lay derrick over. LD front wind walls.
Move rig off 18A and LD derrick.
Move rig from D to E pad.
Raise derrick.
Raise front wind walls. Lower C section. PU diverter. Install
knife valve. Set matting boards around well. Unbridle.
Spot rig mat boards
Drive up on matts, spot rig over conductor
Skid floor
Hang bridle lines, RU top drive, RU rig floor, RIG
ACCEPTED AT 11 :00 hrs
Install saver sub, fill pits wi spud mud, NIU diverter and
lines, load pipe shed wi DP, HWDP and casing, install
top drive torque tube, link tilt rams, change 5" jaw in
clamp cylinder, PU bails, hook up hydraulic lines, install
mouse hole, change jaws in Iron Roughneck, hang rig
tongs, spill proof riser under rig floor
Slip and cut drilling line
PJSM, PU and stand back HWDP in derrick
PU, MU, STRAP HWDP AND JARS INTO DERRICK
FUNCTION TEST DIVERTER, AOGCC WAIVER TO
WITNESS
PU, MU, STRAP, 5" DP INTO DERRICK
PU, MU, DIRECTIONAL BHA, SERVICE BREAKS, LOAD
PROBE, ADJUST MOTOR SETTING TO 1.83 DEG,
ORIENT
PRE SPUD SAFETY MEETING
FILL WELLBORE, CHECK LINES, PRESSURE TEST
LINES TO 3000 PSI
DRILL CEMENT FROM 111 TO 114', DRILL FROM 114
TO 150'
RIG REPAIR, CONVEYOR # 1, TRIM PADDLES
DRILL FROM 150 TO 160'
RIG REPAIR, CONVEYOR # 1, WELD AND MODIFY
PADDLES
DRILL FROM 160 TO 602'
DIRECTIONAL DRILL & SURVEY WI MWD 131/2"
WELLBORE FROM 602' TO 1313' ART 2.37, AST 5.73,
ADT 8.1 FLOW RATE IN BETWEEN 450-650. INCREASE
FLOW RATE TO 650 GPM PLUS AFTER GETTING BELOW
PERMAFROST.
1313' to 2229' SURVEY WI MWD
ART 1.4, AST 6.83, ADT 8.23
DIRECTIONAL DRILL 131/2" WELLBORE FROM 2229'
TO 2803'
AST 3.05, ART 1.33, ADT 4.38
CIRCULATE SWEEP, CLEAN WELLBORE, 2100 psi @
15.5 bpm
POOH, TIGHT @ 2480'
BACKREAM FROM 2480' TO 1911'
POOH FROM 1911'
Printed: 11/5/2001 10:49:20 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/19/2001
10/20/2001
10/21/2001
10/22/2001
(
(
Page 2 of 5
BP EXPLORATION
Operations Summary Report
E-102
E-102
DRILL +COMPLETE
DOYON
DOYON 14
From - To Hours Activity Code NPT
13:00 - 15:00
15:00 -15:30
15:30 - 17:30
17:30 - 21 :30
21 :30 - 00:00
00:00 - 14:30
14:30 - 16:00
16:00 - 20:00
20:00 - 22:00
22:00 - 00:00
00:00 - 01 :00
01 :00 - 01 :30
01 :30 - 03:00
03:00 - 06:00
06:00 - 07:00
07:00 - 07:30
07:30 - 09:00
09:00 - 18:00
18:00 -18:30
18:30 - 21 :00
21 :00 - 21 :30
21 :30 - 22:00
22:00 - 00:00
00:00 - 01 :30
01 :30 - 02:30
02:30 - 04:30
04:30 - 07:00
07:00 - 08:00
Phase
2.00 DRILL
0.50 DRILL
2.00 DRILL
SURF
SURF
SURF
P
P
P
4.00 DRILL
SURF
P
2.50 DRILL
14.50 DRILL
SURF
SURF
P
P
1.50 DRILL
4.00 DRILL
SURF
SURF
P
P
2.00 DRILL
SURF
P
2.00 DRILL
SURF
P
1.00 DRILL
P
SURF
0.50 DRILL
1.50 DRILL
3.00 DRILL
SURF
SURF
SURF
P
P
P
1.00 DRILL
0.50 DRILL
1.50 DRILL
9.00 DRILL
SURF
SURF
SURF
SURF
P
P
P
P
0.50 DRILL
SURF
P
2.50 DRILL
SURF
P
0.50 DRILL
0.50 DRILL
SURF
SURF
P
P
2.00 DRILL
P
SURF
1.50 CEMT
SURF
P
1.00 CEMT
SURF
P
2.00 CEMT P
2.50 BOPSU¡:; P
1.00 BOPSU¡:; P
SURF
INT1
INT1
Start: 10/16/2001
Rig Release: 10/31/2001
Rig Number:
Spud Date: 10/17/2001
End: 10/31/2001
Description of Operations
HANDLE DIRECTIONAL BHA
CLEAN RIG FLOOR
MU DIRECTIONAL BHA # 2, MOTOR SET AT 1.5
DEGREES, BIT # 2
RIH, WASH FROM 1690 TO 1750', 1822 TO 1843', 2040
TO 2090', 2290 TO 2803'
DIRECTIONAL DRILL FROM 2803 TO 3105'
DIRECTIONAL DRILL 131/2" WELLBORE FROM 3105
TO 4422', SURVEY WI MWD
AST 3.03, ART 6.30, ADT 9.3
CIRCULATE SWEEP AT 650 GPM, SHAKERS CLEAN
SHORT TRIP TO 1867', WORK TIGHT WELLBORE AT
2900 TO 1900', WASH AND BACKREAM OUT, WASH
AND REAM IN FROM 2,600 TO 2900', BACK TO
BOTTOM WIO PUMPS
CIRCULATE SWEEP, BOTTOMS UP, SOME WELLBORE
CUTTINGS AT SHAKER. ADD LUBRICANT TO ACTIVE
SYSTEM.(APP.2% TOTAL)
POOH, WORK 30-40K OVERPULLS FIRST TWO STANDS.
WORK INTERMITTENT TIGHT HOLE, WITH MINIMAL
BACKREAMING REQUIRED, FROM 3450 TO 2817.
POOH FROM 3450', PUMP OUT FROM 3450 TO 3059',
650 PSI AT 6 BPM
BACKREAM FROM 3059 TO 2819'
POOH FROM 2819'
HANDLE DIRECTIONAL BHA, LD COLLARS, STABS,
FLUSH FROM MWD TO MOTOR, LD MWD, PONY
COLLARS, MOTOR, BIT, MAKE SERVICE BREAKS,
ADJUST MOTOR SETTING
CLEAR RIG FLOOR
DUMMY RUN WI 10 3/4" LANDING JOINT AND ANCHOR
RU TO RUN 10 3/4" CASING
PJSM, RUN 103/4" CASING, WASH FROM 3720' TO
BOTTOM 4407.21'
PU CASING HANGER, LAND CASING CLEAR RIG
FLOOR
CIRCULATE AND CONDITION MUD FOR CEMENTING,
STAGE PUMP RATE TO 10 BPM, 800 PSI,
RECIPROCATE CASING, DROP YP TO 24
PJSM WI RIG CREW, CEMENTERS, TRUCK DRIVERS
RD FRANKS CIRCULATING TOOL, INSTALL
CEMENTING HEAD
CEMENT WI SCHLUMBERGER, 10 3/4" CASING AS PER
PROGRAM
PJSM. CEMENT WI SCHLUMBERGER AS PER
PROGRAM
DISPLACE WI RIG PUMP, 4077 STROKES, 7 BPM, 500
PSI, SLOW PRIOR TO BUMPING PLUG 800 PSI AT 4
BPM, BUMP PLUG AT 1300 PSI
CHECK FLOATS HELD, OK, UO CEMENT EQUIPMENT
PJSM, NIPPLE DOWN DIVERTER AND HYDRIL, TIE
HYDRIL IN CELLAR
NIPPLE UP FMC SPEED HEAD, TEST TO 1000 PSI, 10
Printed: 11/5/2001 10:49:20 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/22/2001
10/23/2001
10/24/2001
10/25/2001
(
("
-'
Page 3 of 5
BP EXPLORATION
Operations Summary Report
E-102
E-1 02
DRILL +COMPLETE
DOYON
DOYON 14
From - To Hours Activity Code NPT
07:00 - 08:00
08:00 - 10:00
10:00 -11:00
11 :00 - 17:00
17:00 -17:30
17:30 -18:00
18:00 - 20:00
20:00 - 20:30
20:30 - 21 :30
21 :30 - 22:00
22:00 - 00:00
00:00 - 02:00
02:00 - 03:30
03:30 - 06:00
06:00 - 07:30
07:30 - 08:30
08:30 - 10:30
10:30 -11:00
11 :00 - 11 :45
11 :45 - 12:00
12:00 - 13:00
13:00 - 00:00
00:00 - 11 :00
11 :00 - 11 :30
11 :30 - 15:30
15:30 -16:00
16:00 - 17:00
17:00 - 00:00
00:00 - 02:00
02:00 - 03:00
03:00 - 04:30
04:30 - 06:00
06:00 - 09:00
1,00 BOPSUF P
2.00 BOPSUF P
1.00 BOPSUF P
6.00 BOPSUF P
0.50 BOPSUF P
0.50 DRILL P
2.00 DRILL P
0.50 DRILL P
1.00 DRILL P
0.50 DRILL P
2.00 DRILL
P
2.00 DRILL
1.50 DRILL
P
P
2.50 DRILL
P
1.50 DRILL
P
1.00 DRILL
P
2.00 DRILL
P
0.50 DRILL
0.75 DRILL
0.25 DRILL
P
P
P
1.00 DRILL
P
11.00 DRILL
P
11.00 DRILL
0.50 DRILL
P
P
4.00 DRILL
P
0.50 DRILL
1.00 DRILL
P
P
7.00 DRILL
P
2.00 DRILL
P
1.00 DRILL
P
1.50 DRILL
1.50 DRILL
P
P
3.00 DRILL
P
Phase
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
Start: 10/16/2001
Rig Release: 10/31/2001
Rig Number:
Spud Date: 10/17/2001
End: 10/31/2001
Description of Operations
MINUTES, OK,
NIPPLE UP BOPE
RIG UP TO PRESSURE TEST BOPE
PRESSURE TEST BOPE AS PER BP POLICY
250 PSI FOR 5 MINUTES, 4000 PSI FOR 10 MINUTES
RIG DOWN BOPE TEST EQUIPMENT
INSTALL WEAR BUSHING
PICK UP 5" DP FROM PIPE SHED, 69 JTS, RIH
LOAD DIRECTIONAL BHA INTO PIPE SHED
POOH WI DP, STAND BACK IN DERRICK
LD 8" JARS FROM DERRICK, MU 6" JARS, STAND
BACK IN DERRICK
PU, MU DIRECTIONAL BHA, BIT FGS+C MT, MOTOR
SET 1.15 DEGREES
UPLOAD MWD, PU, MU, BHA, SURFACE TEST MWD
PJSM, SLIP AND CUT DRILLING LINE, SERVICE TOP
DRIVE
PICK UP 5" DRILLPIPE, SINGLE INTO HOLE, 36 STDS,
TAG CEMENT AT 4312'
CIRCULATE BOTTOMS UP, CONDITION MUD
PROPERTIES,
RU, PRESSURE TEST 10 3/4" CASING TO 3500 PSI
FOR 30 MINUTES, OK
DRILL FROM 4312' TO 4422', FLOAT COLLAR,
CEMENT, SHOE,
DIRECTIONAL DRILL FROM 4422' TO 4442', ADT 0.7
CIRCULATE BOTTOMS UP, CONDITION MUD
LOT WI 9.3 PPG, 2 BBLS AT 720 PSI = 12.96 PPG
EMW
DISPLACE WELLBORE TO LSND MUD SYSTEM,
ESTABLISH BASE LINE ECD, 10.5 PPG @ 635 GPM,
PUMP 1 AND 2 SPR, PJSM
DIRECTIONAL DRILL FROM 4442' TO 5500', AST 1.3,
ART 6.12, ADT 7.42
DIRECTIONAL DRILL FROM 5500' TO 6362', ADT 7.43
CIRCULATE WELLBORE PRIOR TO WIPER TRIP, 15.5
BPM AT 2050 PSI, FLOW CHECK
WIPER TRIP, PUMP OUT FROM 5979' TO 4383' AT 8
BPM
CLEAN RIG FLOOR, PREPARE TO TRIP IN
TRIP IN, TIGHT AT 6100' TO 6150', WASH FROM 6200'
TO 6362'
DIRECTIONAL DRILL FROM 6362' TO 6649', WORK
TIGHT I STICKY WELLBORE AT 6373', 15 MINUTES,
6453' 30 MINUTES, AST 1.07, ART 2.34, ADT 3.41
DIRECTIONAL DRILL 97/8" FROM 6589' TO 6666', AST
0, ART 1.25, ADT 1.25
CIRCULATE HI VIS WEIGHTED SWEEP, 2000 PSI, 15.5
BPM
TRIP OUT TO 4253, CIRCULATE OUT
FLOW CHECK AT SHOE, PUMP DRY JOB, POOH,
RACK HWDP
HANDLE DIRECTIONAL BHA, FRESH WATER FLUSH
Printed: 11/5/2001 10:49:20 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/25/2001
10/26/2001
10/27/2001
10/28/2001
(
("
,
Page 4 of 5
BP EXPLORATION
Operations Summary Report
E-102
E-102
DRILL +COMPLETE
DOYON
DOYON 14
06:00 - 09:00
From - To Hours Activity Code NPT
P
09:00 - 12:00
12:00 - 14:30
14:30 - 16:30
16:30 - 17:30
17:30 - 18:00
18:00 - 22:00
22:00 - 00:00
00:00 - 12:00
12:00 - 00:00
00:00 - 12:00
12:00 - 13:00
13:00 - 14:00
14:00 - 14:30
14:30 - 16:00
16:00 -17:00
17:00 - 00:00
00:00 - 02:00
02:00 - 02:30
02:30 - 04:00
04:00 - 05:00
05:00 - 12:00
12:00 - 16:00
16:00 - 16:30
16:30 - 17:30
17:30 -18:00
18:00 - 18:30
18:30 - 20:30
3.00 DRILL
3.00 DRILL
2.50 DRILL
2.00 DRILL
1.00 DRILL
0.50 DRILL
4.00 DRILL
2.00 DRILL
12.00 DRILL
12.00 DRILL
12.00 DRILL
1.00 DRILL
1.00 DRILL
0.50 DRILL
1.50 DRILL
1.00 DRILL
7.00 DRILL
2.00 DRILL
0.50 DRILL
1.50 DRILL
1.00 DRILL
7.00 DRILL
4.00 DRILL
0.50 DRILL
1.00 CASE
0.50 CASE
0.50 CASE
2.00 CASE
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
Phase
INT1
INn
INn
INT1
INn
INT1
INT1
INn
INT1
INn
INT1
INT1
INn
INT1
INT1
INn
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
Start: 10/16/2001
Rig Release: 10/31/2001
Rig Number:
Spud Date: 10/17/2001
End: 10/31/2001
Description of Operations
BHA, READ MWD, PULL PROBE, BREAK OFF BIT, LD
MOTOR, STABS, XIO, MAKE SERVICE BREAKS
PU, MU, DIRECTIONAL BHA, PDC BIT FM2665, MOTOR
SET AT 1.15 DEGREES, MWD, LOAD PROBE,
INITIALIZE CALIBRATION SUB
UPLOAD MWD, TEST ADJUSTABLE STABLIZER AT 600
BPM, PJSM, LOAD NUCLEAR SOURCES
RIH WI 5" DP TO CASING SHOE, 4393', CHECK
HARDBANDING, 69/16' TO 67/8"
FILL DRILLSTRING, PJSM, SLIP AND CUT, RIG
SERVICE,
SERVICE TOP DRIVE
TRIP IN, TIGHT AT 4560', WASH TO BOTTOM
DIRECTIONAL DRILL FROM 6666' TO 6798' AST 0,
ART 1.06, ADT 1.06
DIRECTIONAL DRILL FROM 6798' MD, 5581' TVD TO
7662' MD, 6220' TVD
AST 1.87, ART 6.17, ADT 8.04
DIRECTIONAL DRILL FROM 7662' MD, 6220' TVD TO
8622' MD, 6930' TVD
AST 0, ART 8.7, ADT 8.7
DIRECTIONAL DRILL FROM 8622' MD, 6930' TVD TO
9580' MD, 7693' TVD
AST 0, ART 8.47, ADT 8.47
DIRECTIONAL DRILL FROM 9580' MD, 7693' TVD TO
9676' MD, 7773' TVD
CIRCULATE BOTTOMS UP AT 635 GPM
FLOW CHECK, PUMP DRY JOB
WIPER TRIP FROM 9676' TO 6608',
RIH, WASH DOWN LAST STAND
DIRECTIONAL DRILL FROM 9676' MD 7773' TVD TO
10155' MD, 8189' TVD,
AST 0, ART 5.53, ADT 5.53
DIRECTIONAL DRILL FROM 10155' MD, 8189' TVD TO
10315' MD, 8321.27' TVD,
AST 0, ART 2.5, ADT 2.5
CIRCULATE SWEEP, 3500 PSI AT 14 BPM
WIPER TRIP TO 9581', OVERPULL 90 TO 110,000 LBS
CIRCULATE SWEEP, SPOT CASING RUNNING PILL
3000 PSI AT 14 BPM
FLOW CHECK, POOH TO 9869', FLOW CHECK, 9390'
FLOW CHECK, POOH, 4404', FLOW CHECK, POOH,
STRAP ALL DRILLPIPE, NO CORRECTION,
UD HWDP, PLSM, REMOVE SOURCES, DOWN LOAD
MWD, UD DIRECTIONAL BHA, FUNCTION BLIND RAMS
CLEAR RIG FLOOR
CHANGE UPPER RAMS TO 7 5/8"
PULL WEAR BUSHING, DUMMY RUN 75/8" CASING
HANGER,
INSTALL TEST PLUG, TEST RAM DOORS. OK,
PULL TEST PLUG
RIU FLOOR TO RUN 7 5/8" CASING, CHANGE BALES,
ELEVATORS, FRANKS TOOL, SPIDER, FALSE FLOOR,
Printed: 11/5/2001 10:49:20 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/28/2001
10/29/2001
10/30/2001
10/31/2001
(
(
Page 5 of 5
BP EXPLORATION
Operations Summary Report
E-102
E-102
DRILL +COMPLETE
DOYON
DOYON 14
From - To Hours Activity Code NPT
18:30 - 20:30
20:30 - 21 :00
21 :00 - 00:00
00:00 - 10:00
10:00 - 13:30
13:30 - 16:30
16:30 - 18:30
18:30 - 19:30
19:30 - 20:30
20:30 - 00:00
00:00 - 01 :30
01 :30 - 02:30
02:30 - 12:00
12:00 - 15:00
15:00 - 15:30
15:30 - 17:30
17:30 - 18:00
18:00 - 19:00
19:00 - 00:00
00:00 - 07:00
07:00 - 08:30
08:30 - 10:30
10:30 - 12:00
12:00 - 13:00
13:00 - 15:00
15:00 -17:30
17:30 - 21 :00
21 :00 - 21 :30
21 :30 - 22:00
22:00 - 00:00
Phase
2.00 CASE
0.50 CASE
3.00 CASE
10.00 CASE
3.50 CASE
P
P
P
P
P
INT1
INT1
INT1
INT1
INT1
3.00 CASE
P
INT1
2.00 CASE
P
INn
1.00 CASE
P
INT1
1.00 CASE
3.50 CASE
1.50 CASE
1.00 CASE
P
P
P
P
INT1
INT1
COMP
COMP
9.50 CASE
P
CaMP
3.00 CASE P
0.50 CASE P
2.00 RUNCO~rP
0.50 RUNCO~rP
1.00 RUNCO~rP
5.00 RUNCO~rP
7.00 RUNCO~rP
1.50 RUNCO~fp
2.00 RUNCO~rP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
1.50 RUNCO~fP
COMP
1.00 RUNCO~fp
2.00 RUNCO~rP
2.50 BOPSUR P
COMP
COMP
CaMP
3.50 WHSUR P
COMP
0.50 WHSUR P
0.50 WHSUR P
2.00 WHSUR P
COMP
COMP
COMP
Start: 10/16/2001
Rig Release: 10/31/2001
Rig Number:
Spud Date: 10/17/2001
End: 10/31/2001
Description of Operations
COMPLETE CHECK LIST
PJSM TO RUN CASING
RUN 75/8" CASING, TEST FLOAT COLLAR
Con't run 7 5/8" casing to 10,307 ft
Circ 7 5/8" csg @ 10,307 ft. MU mandrel hanger and cement
head
PJSM. cement 7 5/8" casing as per program. Land casing on
mandrel hanger wi shoe @ 10,307 ft.
Check floats O-K. RD head and landing jt. Run, set and test
pack off - 5000 psi O-K.
Change pipe rams to 4 1/2" x 7" variables. Start freeze protect
procedures by pumping mud on hourly time phases to clear 7
5/8" x 10 3/4" annulus
Clear floor, RU 5" DP handling equipment. PJSM
LD 5" DP from derrick out of mousehole.
LD 5" DP from derrick.
Flush #1 mud pump with water and test 7 5/8" casing to 4,000
psi for 30 minutes.
RU Schlumberger eline. Run 6.6" gage ring I junk basket and
USIT cement evaluation tool. Tag at 10,190' eline measure.
TOC at 9,120'.
Run 6.75" OD gage ring.
RD eline.
PJSM. RU to run 5 1/2" tubing.
Change pup joint on GLM.
MU 41/2" tail pipe assembly. PU and Inspect packer. Change
elevators. Drift 4 1/2" x 5 1/2" XO.
Run 5 1/2", 17#, L-80, SealLock HC tubing to 3,400'.
Continue running 5 1/2" tubing.
MU tubing hanger and land tubing. RILDS.
RU and reverse circulate 162 bbls of seawater (85 bbls treated
with corrosion inhibitor) down IA.
Drop ball and set packer. Test tubing to 4,000 psi for 30
minutes. Bleed tubing pressure to 2,000 psi. Test tubing x
casing annulus to 4,000 psi for 30 minutes. Bleed tubing
pressure and shear RP valve.
RD and LD landing joint. Install TWC and test.
RD tubing running equipment. Change bails.
ND BOP. PU and thaw adapter flange and prepare tubing
hanger.
PU and thaw tree. Remove outer valve and install blind flange.
NU tree.
Pull TWC with lubricator.
RU for freeze protection.
Pump 100 bbls of diesel down IA at 3 bpm, 2,800 psi. U-tube
diesel into tubing. Set BPV and test from below to 1,000 psi.
Release rig at 24:00 hrs on 10/31/01.
Printed: 11/5/2001 10:49:20AM
Well:
Field:
API:
Permit:
(
(
10/16/01
10/17101
10/31/01
Doyon 14
-----.----- -- .-----. ._--. ....---- ..._--... - .-.-'-' -- .- - -- '------' .--.----. -------,--",----"--'-'-'------' _.. . --_.. -----. --- '----'---
E-102
Prudhoe Bay Field 1 Midnight
50-029-23042-00
201-186
Rig Accept:
Rig Spud:
Rig Release:
DrillingBig:
12/18/01
MIRU E-Line, RIH, Log GRICCL Jewelry log. Perforate 10094' -10124',10058' -10082' with 3-3/8"
HSD PJ Gun Diameter, 6 SPF (3 runs). RDMO E-Line, notify Pad OP of well status "Shut In". Will
perforate 1 0006' - 1 0036' tomorrow.
POST - RIG WORK
12/19/01
Completed perforating shot 30' interval (10006' -10036'). Made to gun runs with 3-38" HSD PJ Gun
Diameter, 6 SPF, random oriented, 60 degree phased guns. Left Well shut-in and turn back to
operations. Well is Ok to POP.
(
It:'
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Definative Surveys
Re: Distribution of Survey Data for Well E-102
~OJ-I'(b
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 0.00' MD
Window / Kickoff Survey , MD
Projected Survey: 10,315.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
08-Nov-01
RECEIVED
NOV 1 .j 2001
.."',,
":,..' "
" ,"~i:~m~;:!I(,
,~jF:)~,I~:,
DEFINITIVE
--....
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad, Slot E-102
E-102
Job No. AKZZ11169, Surveyed: 28 October, 2001
.-2.
SURVEY REPORT
8 November, 2001
Your Ref: API 500292304200
Surface Coordinates: 5976746.51 N, 664447.66 E (70020' 33.9830" N, 148039' 55.0328" W)
Kelly Bushing: 64. 11ft above Mean Sea Level
/..-0"
spe""""y-sUIl
DRILLING seRVices
A Halliburton Company
Survey Ref: 5vy10971
. ,
Sperry-Sun Drilling Services
Survey Report for E-102
Your Ref: API 500292304200
Job No. AKZZ11169, Surveyed: 28 October, 2001
DEFt N IT lYE .
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates. Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth ' Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
_. 0.00 0.000 0.000 -64.11 0.00 0.00 N O.OOE 5976746.51 N 664447.66 E 0.00 Tolerable Gyro _J
153.00 0.350 146.000 88.89 153.00 0.39S 0.26E 5976746.13 N 664447.93 E 0.229 -0.43 AK-6 BP IFR-AK
258.28 0.440 115.670 194.17 258.28 0.838 0.81 E 5976745.70 N 664448.48 E 0.213 -0.97
300.47 0.240 127.020 236.36 300.47 0.95S 1.02 E 5976745.58 N 664448.70 E 0.498 -1.13
387.23 0.090 64.330 323.12 387.23 1.038 1.23 E 5976745.50 N 664448.91 E 0.247 -1.24
477.40 0.340 171.330 413.29 477.40 1.27 S 1.33 E 5976745.27 N 664449.02 E 0.417 -1.49
567.23 2.180 259.270 503.09 567.20 1.858 0.31 W 5976744.66 N 664447.39 E 2.443 -1.76
658.17 4.920 264.160 593.85 657.96 2.575 5.89W 5976743.81 N 664441.83 E 3.029 -1.42
750.15 7.630 269.210 685.27 749.38 3.058 15.92 W 5976743.11 N 664431.81 E 3.004 -0.02
845.07 9.240 290.660 779.18 843.29 0.45 S 29.35 W 5976745.42 N 664418.32 E 3.693 5.04
942.41 11.560 292.120 874.92 939.03 5.98N 45.70 W 5976751.49 N 664401.84 E 2.399 14.42
1038.66 12.810 293.430 969.00 1033.11 13.86 N 64.43W 5976758.95 N 664382.94 E 1.330 25.65
1133.76 14.750 292.620 1061.36 1125.47 22.70 N 85.28 W 5976767.34 N 664361.90 E 2.050 38.24
1229.23 16.600 288.680 1153.28 1217.39 31.75 N 109.42 W 5976775.85 N 664337.57 E 2.235 51.64
1326.48 19.800 288.310 1245.65 1309.76 41.37 N 138.22 W 5976784.84 N 664308.56 E 3.293 66.47
1419.22 21.490 290.260 1332.43 1396.54 52.19 N 169.07 W 5976794.98 N 664277.48 E 1.967 82.87
1514.20 23.980 296.810 1420.04 1484.15 66.93 N 202.63 W 5976808.98 N 664243.61 E 3.735 103.61
1609.45 24.380 297.030 1506.93 1571.04 84.59 N 237.42 W 5976825.87 N 664208.44 E 0.430 127.47 ,-
1706.27 25.550 297.790 1594.70 1658.81 103.41 N 273.69 W 5976843.89 N 664171.77 E 1.253 152.73
1802.73 25.020 297.720 1681.92 1746.03 122.59 N 310.15 W 5976862.27 N 664134.89 E 0.550 178.39
1897.53 23.850 298.250 1768.23 1832.34 140.99 N 344.78 W 5976879.90 N 664099.87 E 1.256 202.94
1992.75 25.880 301.750 1854.62 1918.73 161.04 N 379.42 W 5976899.19 N 664064.80 E 2.632 229.11
2089.79 28.050 304.690 1941.11 2005.22 185.18 N 416.19 W 5976922.51 N 664027.51 E 2.624 259.69
2187.34 31.220 307.850 2025.90 2090.01 213.75 N 455.03 W 5976950.23 N 663988.05 E 3.622 295.01
2280.60 34.680 314.430 2104.17 2168.28 247.18 N 493.08 W 5976982.81 N 663949.27 E 5.333 334.96
2378.29 35.420 322.650 2184.19 2248.30 289.16 N 530.12 W 5977023.97 N 663911.32 E 4.888 383.13
2470.48 40.880 330.490 2256.70 2320.81 336.72 N 561.23 W 5977070.83 N 663879.17 E 7.907 435.66
2572.16 42.010 337.160 2332.95 2397.06 397.06 N 590.85 W 5977130.51 N 663848.25 E 4.480 500.48
2666.89 41.670 343.840 2403.56 2467.67 456.55 N 611.93 W 5977189.53 N 663825.87 E 4.716 562.86
2763.02 42.430 353.300 2475.02 2539.13 519.52 N 624.62 W 5977252.20 N 663811.80 E 6.634 627.09
----- -- . __H -- -
------- ------
--~~-
--------
8 November, 2001 - 10:53
Page 2 of 6
DrillQuest 2.00.08.005
, ,
Sperry-Sun Drilling Services
Survey Report for E-102
Your Ref: API 500292304200
Job No. AKZZ11169, Surveyed: 28 October, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates' Global Coordinates Dogleg Vertical
.
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
'-- 2856.99 41.450 356.960 2544.93 2609.04 582.07 N 629.97 W 5977314.62 N 663805.08 E 2.~04 689.54 --',
2952.75 41.310 356.880 2616.78 2680.89 645.28 N 633.37 W 5977377.74 N 663800.29 E 0.156 752.27
3047.07 42.260 359.800 2687.12 2751.23 708.09 N 635.17 W 5977440.50 N 663797.11 E 2.295 814.31
3143.77 42.310 359.630 2758.66 2822.77 773.15 N 635.50 W 5977505.53 N 663795.36 E 0.129 878.28
3239.92 41.590 0.030 2830.17 2894.28 837.42 N 635.69 W 5977569.79 N 663793.76 E 0.799 941.46
3335.51 40.040 357.980 2902.51 2966.62 899.88 N 636.76 W 5977632.21 N 663791.32 E 2.143 1003.02
3431.94 38.630 354.750 2977.10 3041.21 960.87 N 640.60 W 5977693.09 N 663786.13 E 2.578 1063.65
3526.54 38.630 356.800 3051.01 3115.12 1019.76 N 644.95 W 5977751.87 N 663780.49 E 1.353 1122.31
3622.64 38.610 356.240 3126.09 3190.20 1079.63 N 648.59 W 5977811.65 N 663775.54 E 0.364 1181.81
3718.06 40.820 355.450 3199.48 3263.59 1140.43 N 653.02 W 5977872.34 N 663769.78 E 2.376 1242.37
3814.09 39.020 357.440 3273.13 3337.24 1201.93 N 656.86 W 5977933.74 N 663764.59 E 2.298 1303.50
3910.27 41.230 355.060 3346.68 3410.79 1263.76 N 660.94 W 5977995.4 7 N 663759.15 E 2.797 1365.01
4006.50 41.660 356.350 3418.81 3482.92 1327.27 N 665.71 W 5978058.86 N 663752.99 E 0.993 1428.29
4101.64 43.330 351.890 3488.98 3553.09 1391.17N 672.33 W 5978122.59 N 663744.97 E 3.620 1492.30
4199.77 43.430 352.070 3560.30 3624.41 1457.91 N 681.73 W 5978189.11 N 663734.11 E 0.162 1559.62
4295.40 43.750 352.980 3629.56 3693.67 1523.28 N 690.31 W 5978254.28 N 663724.10 E 0.737 1625.44
4367.38 45.010 353.270 3681.01 3745.12 1573.26 N 696.34 W 5978304.12 N 663716.98 E 1.773 1675.67
4488.63 42.250 352.860 3768.76 3832.87 1656.30 N 706.43 W 5978386.92 N 663705.07 E 2.288 1759.14 -".
4573.72 41.250 351.550 3832.24 3896.35 1712.44 N 714.11 W 5978442.87 N 663696.16 E 1.559 1815.72
4678.02 40.150 354.080 3911.32 3975.43 1779.90 N 722.63 W 5978510.13 N 663686.16 E 1.901 1883.59
4780.57 39.900 353.760 3989.85 4053.96 1845.48 N 729.61 W 5978575.54 N 663677.74 E 0.316 1949.32
4876.50 39.810 353.600 4063.49 4127.60 1906.59 N 736.38 W 5978636.48 N 663669.63 E 0.142 2010.61
4972.39 39.490 353.600 4137.32 4201.43 1967.39 N 743.20 W 5978697.13 N 663661.48 E 0.334 2071.62
5068.50 39.320 355.160 4211.59 4275.70 2028.11 N 749.18W 5978757.69 N 663654.17 E 1.045 2132.38
5163.59 39.940 354.990 4284.82 4348.93 2088.53 N 754.38 W 5978817.99 N 663647.64 E 0.662 2192.71
5259.81 39.750 355.770 4358.70 4422.81 2149.98 N 759.35 W 5978879.32 N 663641.33 E 0.556 2254.01
53S5.82 41.110 356.740 4431.78 4495.89 2212.11 N 763.41 W 5978941.34 N 663635.91 E 1.561 2315.80
5451.42 40.820 356.530 4503.97 4568.08 2274.68 N 767.09 W 5979003.81 N 663630.86 E 0.336 2377.95
5547.61 40.490 356.610 4576.94 4641.05 2337.23 N 770.84 W 5979066.27 N 663625.74 E 0.347 2440.11
5642.48 40.130 356.090 4649.29 4713.40 2398.48 N 774.74 W 5979127.42 N 663620.49 E 0.519 2501.01
----- ---_.--~----
8 November, 2001 - 10:53
Page 3 of 6
DrillQl1est 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for E-102
Your Ref: API 500292304200
Job No. AKZZ11169, Surveyed: 28 October, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates' Global Coordinates Dogleg Vertical
.
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
.--- 5738.27 39.770 355.820 4722.72 4786.83 2459.84 N 779.08 W 5979188.66 N 663614.81 E 0.417 2562.09 .--.
5834.72 40.690 356.560 4796.36 4860.47 2521.99 N 783.22 W 5979250.71 N 663609.31 E .1.075 2623.92
5929.51 40.760 357.540 4868.19 4932.30 2583.75 N 786.40 W 5979312.39 N 663604.77 E 0.679 2685.19
6025.66 40.130 357.080 4941.37 5005.48 2646.05 N 789.33 W 5979374.61 N 663600.48 E 0.725 2746.94
6121.34 39.790 357.4 70 5014.70 5078.81 2707.43 N 792.25 W 5979435.91 N 663596.21 E 0.441 2807.79
6218.05 39.480 356.880 5089.18 5153.29 2769.05 N 795.29 W 5979497.45 N 663591.82 E 0.504 2868.89
6312.42 39.290 357.140 5162.12 5226.23 2828.85 N 798.41 W 5979557.16 N 663587.39 E 0.267 2928.22
6410.03 40.620 357.400 5236.94 5301.05 2891.46 N 801.40 W 5979619.69 N 663583.03 E 1.373 2990.28
6506.36 40.970 358.100 5309.87 5373.98 2954.35 N 803.86 W 5979682.51 N 663579.18 E 0.598 3052.52
6601.77 41.550 356.430 5381.59 5445.70 3017.19 N 806.87 W 5979745.28 N 663574.80 E 1.305 3114.82
6636.10 41.690 356.670 5407.26 5471.37 3039.95 N 808.24 W 5979768.00 N 663572.93 E 0.618 3137.44
6732.46 42.150 357.120 5478.96 5543.07 3104.23 N 811.73W 5979832.19 N 663568.03 E 0.570 3201.24
6828.34 42.430 357.580 5549.88 5613.99 3168.68 N 814.71 W 5979896.56 N 663563.63 E 0.435 3265.11
6924.50 42.440 357.630 5620.85 5684.96 3233.51 N 817.42 W 5979961.31 N 663559.50 E 0.037 3329.30
7020.03 42.620 357.540 5691.25 5755.36 3298.03 N 820.14 W 5980025.75 N 663555.37 E 0.199 3393.19
7116.43 42.890 357.790 5762.04 5826.15 3363.42 N 822.81 W 5980091.07 N 663551.27 E 0.331 3457.93
7212.28 43.250 357.770 5832.06 5896.17 3428.82 N 825.35 W 5980156.40 N 663547.30 E 0.376 3522.65
7307.75 43.470 358.200 5901.47 5965.58 3494.33 N 827.65 W 5980221.84 N 663543.56 E 0.386 3587.44 -
7403.87 43.960 357.770 5970.94 6035.05 3560.71 N 829.99 W 5980288.16 N 663539.76 E 0.596 3653.09
7499.38 44.140 357.870 6039.59 6103.70 3627.07 N 832.51 W 5980354.45 N 663535.78 E 0.202 3718.75
7595.69 44.370 356.540 6108.57 6172.68 3694.20 N 835.79 W 5980421.49 N 663531.03 E 0.993 3785.31
7691.74 44.060 356.040 6177.41 6241.52 3761.04 N 840.13 W 5980488.21 N 663525.23 E 0.486 3851.78
7787.30 43.610 356.690 6246.34 6310.45 3827.09 N 844.32 W 5980554.16 N 663519.59 E 0.666 3917.45
7882.89 43.590 355.770 6315.57 6379.68 3892.86 N 848.66 W 5980619.82 N 663513.81 E 0.664 3982.88
7977.94 43.290 355.610 6384.58 6448.69 3958.04 N 853.57 W 5980684.87 N 663507.47 E 0.336 4047.82
80"4.10 42.960 355.490 6454.77 6518.88 4023.57 N 858.67 W 5980750.28 N 663500.94 E 0.354 4113.15
81'10.06 42.370 355.660 6525.33 6589.44 4088.41 N 863.69 W 5980814.99 N 663494.50 E 0.626 4177.79
82137.16 41.790 355.530 6597.40 6661.51 4153.29 N 868.68 W 5980879.75 N 663488.08 E 0.604 4242.46
83133.97 41.520 355.970 6669.73 6733.84 4217.46 N 873.45 W 5980943.79 N 663481.90 E 0.411 4306.39
84!j9.33 40.930 356.170 6741.45 6805.56 4280.15 N 877.76 W 5981006.38 N 663476.22 E 0.634 4368.78
- ---- - -~-- -- n-__-
8 November, 2001 - 10:53
Page 4 of 6
DrilfQIlf>.st 2.00.08.005
, '
Sperry-Sun Drilling Services
Survey Report for E-102
Your Ref: API 500292304200
Job No. AKZZ11169, Surveyed: 28 October, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates' Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth' Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
-- 8555.93 40.380 356.380 6814.74 6878.85 4342.96 N 881.85 W 5981069.08 N 663470.75 E 0.~87 4431.24 ..-~
8649.80 39.920 355.530 6886.49 6950.60 4403.33 N 886.12 W 5981129.34 N 663465.16 E 0.762 4491.35
8745.61 39.540 355.950 6960.17 7024.28 4464.40 N 890.67 W 5981190.30 N 663459.27 E 0.486 4552.20
8842.49 39.030 356.580 7035.16 7099.27 4525.61 N 894.66 W 5981251.41 N 663453.94 E 0.668 4613.08
8938.96 38.450 356.110 7110.40 7174.51 4585.86 N 898.51 W 5981311.55 N 663448.77 E 0.674 4672.98
9035.19 37.630 356.280 7186.19 7250.30 4645.02 N 902.45 W 5981370.62 N 663443.54 E 0.859 4731.84
9131.66 36.780 356.440 7263.03 7327.14 4703.24 N 906.15 W 5981428.74 N 663438.55 E 0.887 4789.72
9226.71 36.200 356.110 7339.44 7403.55 4759.64 N 909.82 W 5981485.05 N 663433.65 E 0.644 4845.82
9321.39 35.430 356.010 7416.22 7480.33 4814.91 N 913.63 W 5981540.22 N 663428.63 E 0.816 4900.83
9418.88 34.760 355.750 7495.99 7560.10 4870.82 N 917.66 W 5981596.03 N 663423.38 E 0.704 4956.50
9514.85 34.210 355.560 7575.09 7639.20 4925.00 N 921.77 W 5981650.11 N 663418.07 E 0.584 5010.50
9611.44 33.770 355.420 7655.18 7719.29 4978.83 N 926.02 W 5981703.83 N 663412.65 E 0.463 5064.17
9705.71 33.330 355.190 7733.74 7797.85 5030.76 N 930.28 W 5981755.65 N 663407.25 E 0.486 5115.98
9802.56 32.510 355.150 7815.04 7879.15 5083.20 N 934.71 W 5981807.99 N 663401.67 E 0.847 5168.33
9897.72 31.080 355.000 7895.92 7960.03 5133.16 N 939.02 W 5981857.83 N 663396.27 E 1.505 5218.21
9993.72 30.020 354.540 7978.59 8042.70 5181.75 N 943.46 W 5981906.31 N 663390.76 E 1.131 5266.77
10089.11 30.160 354.970 8061.13 8125.24 5229.37 N 947.83 W 5981953.83 N 663385.34 E 0.269 5314.38
10185.09 29.970 354.840 8144.19 8208.30 5277.27 N 952.10 W 5982001.62 N 663380.02 E 0.209 5362.22 ~-
10248.77 29.520 354.980 8199.48 8263.59 5308.74 N 954.91 W 5982033.02 N 663376.53 E 0.715 5393.66
10315.00 29.520 354.980 8257.11 8321.22 5341.24 N 957.76 W 5982065.46 N 663372.96 E 0.000 5426.13 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Structure Reference. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.576° (1 0-Oct-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 349.230° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 10315.00ft.,
The Bottom Hole Displacement is 5426.43ft., in the Direction of 349.834° (True).
u_-- - - --
---- ------- -------------
8 November, 2001 - 10:53
Page 5 of 6
DrillQllest 2.00.08.005
4
North Slope Alaska
Comments
'--...-
Measured
Depth
(ft)
10315.00
Sperry-Sun Drilling Services
Survey Report for E-102
Your Ref: API 500292304200
Job No. AKZZ11169, Surveyed: 28 October, 2001
.
5341.24 N
Survey tool program for E-102
Alaska Drilling & Wells
PBU WOA E Pad
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
8321.22
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
153.00
--'-
---- ---_u
8 November, 2001 - 10:53
0.00
153.00
To
Measured Vertical
Depth Depth
(ft) (ft)
153.00
10315.00
153.00
8321.22
- - - _on
Comment
~'-
957.76 W
Projected Survey
Survey Tool Description
Tolerable Gyro
AK-6 BP _IFR-AK
---~-
------ -------
----._>----.-
Page 6 of 6
DrillQuest 2.00.08.005
~
..'
(,
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well E-102 MWD
aO)-J~
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 0.00' MD
Window / Kickoff Survey , MD
Projected Survey: 10,315.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
08-Nov-01
RECEIVED
NOV 1 J 2001
Alaska Oil & Gas Cons C"mmiQo'
. v i~IOn
Anchorage
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad, Slot E-102
E-102 MWD
Job No. AKMM11169, Surveyed: 28 October, 2001
/~.
SURVEY REPORT
8 November, 2001
Your Ref: API 500292304200
Surface Coordinates: 5976746.51 N, 664447.66 E (700 20' 33.9830" N, 148039' 55.0328" W)
Kelly Bushing: 64. 11ft above Mean Sea Level
.-"'.c--.
spe""y-suf1
DRIL.L.ING seRVices
A Halliburton Company
Survey Ref: svy11006
Sperry-Sun Drilling Services
Survey Report for E-102 MWD
Your Ref: API 500292304200
Job No. AKMM11169, Surveyed: 28 October, 2001
.111]
~
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth . Eastings Northings Eastings Rate Section Comment
Incl. Azim. Depth Depth Northings
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O /1 OOft)
Tolerable Gyro ~~.
0.00 0.000 0.000 -64.11 0.00 0.00 N O.OOE 5976746.51 N 664447.66 E 0.00
153.00 0.350 146.000 88.89 153.00 0.39S 0.26E 5976746.13 N 664447.93 E 0.229 -0.43 MWD Magnetic
258.28 0.440 115.550 194.17 258.28 0.83 S 0.81 E 5976745.70 N 664448.48 E 0.214 -0.96
300.47 0.240 126.750 236.36 300.47 0.958 1.02 E 5976745.58 N 664448.70 E 0.497 -1.13
387.23 0.090 64.510 323.12 387.23 1.03 S 1.23 E 5976745.51 N 664448.91 E 0.246 -1.24
477.40 0.340 171.460 413.29 477.40 1.26 S 1.33 E 5976745.27 N 664449.02 E 0.417 -1.49
567.23 2.180 259.420 503.09 567.20 1.84 S 0.31 W 5976744.66 N 664447.39 E 2.443 -1.75
658.17 4.920 264.340 593.85 657.96 2.54S 5.89W 5976743.84 N 664441.83 E 3.029 -1.40
750.15 7.630 269.270 685.27 749.38 3.01 S 15.92 W 5976743.15 N 664431.81 E 3.001 0.02
845.07 9.240 290.730 779.18 843.29 0.39S 29.35 W 5976745.4 7 N 664418.32 E 3.695 5.10
942.41 11.560 292.200 874.92 939.03 6.06 N 45.70 W 5976751.57 N 664401.84 E 2.399 14.49
1038.66 12.810 293.540 969.00 1033.11 13.96 N 64.41 W 5976759.06 N 664382.96 E 1.331 25.75
1133.76 14.750 292.660 1061.36 1125.47 22.84 N 85.25 W 5976767.48 N 664361.93 E 2.052 38.37
1229.23 16.600 288.750 1153.28 1217.39 31.91 N 109.38 W 5976776.01 N 664337.61 E 2.230 51.78
1326.48 19.800 288.460 1245.65 1309.76 41.59 N 138.16 W 5976785.06 N 664308.62 E 3.292 66.68
1419.22 21.490 290.460 1332.43 1396.54 52.50 N 168.98 W 5976795.29 N 664277.57 E 1.974 83.16
1514.20 23.980 297.060 1420.04 1484.15 67.37 N 202.48 W 5976809.42 N 664243.75 E 3.749 104.02
1609.45 24.380 297.220 1506.93 1571.04 85.17 N 237.20W 5976826.45 N 664208.65 E 0.426 127.99 -~
1706.27 25.550 298.020 1594.70 1658.81 104.12 N 273.40 W 5976844.60 N 664172.04 E 1.258 153.37
1802.73 25.020 298.090 1681.92 1746.03 123.49 N 309.76 W 5976863.18 N 664135.27 E 0.550 179.20
1897.53 23.850 298.520 1768.23 1832.34 142.08 N 344.29 W 5976881.01 N 664100.34 E 1.248 203.92
1992.75 25.880 302.050 1854.62 1918.73 162.31 N 378.82 W 5976900.4 7 N 664065.37 E 2.640 230.24
2089.79 28.050 304.950 1941.11 2005.22 186.62 N 415.48 W 5976923.97 N 664028.19 E 2.614 260.97
2187.34 31 .220 308.280 2025.90 2090.01 215.43 N 454.14W 5976951.93 N 663988.91 E 3.661 296.50
2280.60 34.680 315.030 2104.17 2168.28 249.20 N 491.89 W 5976984.86 N 663950.43 E 5.405 336.72
2378.29 35.420 323.200 2184.19 2248.30 291.55 N 528.51 W 5977026.40 N 663912.89 E 4.859 385.18
2470.48 40.880 329.790 2256.69 2320.80 339.07 N 559.73W 5977073.22 N 663880.63 E 7.381 437.69
2572.16 42.010 336.620 2332.95 2397.06 399.09 N 589.99 W 5977132.56 N 663849.06 E 4.581 502.31
2666.89 41.670 343.510 2403.56 2467.67 458.41 N 611.52 W 5977191.40 N 663826.24 E 4.863 564.61
2763.02 42.430 352.780 2475.01 2539.12 521.29 N 624.68 W 5977253.97 N 663811.70 E 6.503 628.84
~U_-- --
-.-.~_.- _.0___0 ____0__---
8 November, 2001 - 10:53
Page 2 of 6
DrillQllest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for E-102 MWD
Your Ref: API 500292304200 -
Job No. AKMM11169, Surveyed: 28 October, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
2856.99 41 .450 357.540 2544.93 2609.04 583.83 N 630.00 W 5977316.38 N 663805.01 E 3.542 691.27 ~
2952.75 41.310 357.360 2616.78 2680.89 647.07 N 632.81 W 5977379.54 N 663800.81 E 0.192 753.92
3047.07 42.260 0.020 2687.11 2751.22 709.89 N 634.24 W 5977442.31 N 663798.01 E 2.132 815.90
3143.77 42.310 0.060 2758.65 2822.76 774.95 N 634.19W 5977507.36 N 663796.62 E 0.059 879.81
3239.92 41.590 0.340 2830.16 2894.27 839.22 N 633.97 W 5977571.62 N 663795.44 E 0.774 942.91
3335.51 40.040 357.910 2902.51 2966.62 901.68 N 634.90 W 5977634.05 N 663793.13 E 2.321 1004.44
3431.94 38.630 354.650 2977.10 3041.21 962.66 N 638.84 W 5977694.92 N 663787.86 E 2.594 1065.08
3526.54 38.630 356.030 3051.00 3115.11 1021.52 N 643.64 W 5977753.66 N 663781.77 E 0.911 1123.80
3622.64 38.610 355.950 3126.08 3190.19 1081.35 N 647.83 W 5977813.39 N 663776.26 E 0.056 1183.36
3718.06 40.820 354.970 3199.48 3263.59 1142.13 N 652.67 W 5977874.04 N 663770.10 E 2.407 1243.97
3814.09 39.020 356.740 3273.13 3337.24 1203.58 N 657.14 W 5977935.38 N 663764.28 E 2.216 1305.18
3910.27 41.230 354.390 3346.67 3410.78 1265.36 N 661.96 W 5977997.05 N 663758.10 E 2.785 1366.77
4006.50 41.660 356.170 3418.81 3482.92 1328.84 N 667.20 W 5978060.39 N 663751.4 7 E 1.303 1430.11
4101.64 43.330 352.100 3488.97 3553.08 1392.73 N 673.80 W 5978124.13 N 663743.47 E 3.380 1494.11
4199.77 43.430 352.410 3560.29 3624.40 1459.52 N 682.88 W 5978190.70 N 663732.93 E 0.240 1561.42
4295.40 43.750 353.240 3629.56 3693.67 1524.94 N 691.11 W 5978255.92 N 663723.26 E 0.686 1627.22
4367.38 45.010 353.400 3681.00 3745.11 1574.94 N 696.97 W 5978305.78 N 663716.31 E 1.757 1677.44
4488.63 42.250 352.940 3768.75 3832.86 1658.00 N 706.91 W 5978388.60 N 663704.55 E 2.291 1760.89 ---
4573.72 41.250 351.610 3832.24 3896.35 1714.14 N 714.52 W 5978444.57 N 663695.71 E 1.570 1817.47
4678.02 40.150 354.110 3911.31 3975.42 1781.61 N 722.99 W 5978511.84 N 663685.76 E 1.885 1885.33
4780.57 39.900 353.780 3989.84 4053.95 1847.20 N 729.94 W 5978577.25 N 663677.37 E 0.320 1951.06
4876.50 39.810 353.670 4063.49 4127.60 1908.31 N 736.66 W 5978638.20 N 663669.31 E 0.119 2012.35
4972.39 39.490 353.720 4137.32 4201.43 1969.12 N 743.38 W 5978698.85 N 663661.26 E 0.335 2073.35
5068.50 39.320 355.280 4211.58 4275.69 2029.85 N 749.23 W 5978759.43 N 663654.08 E 1.045 2134.10
5163.59 39.940 355.080 4284.82 4348.93 2090.28 N 754.33 W 5978819.74 N 663647.66 E 0.666 2194.42
5259.81 39.750 355.860 4358.69 4422.80 2151.74 N 759.20 W 5978881.08 N 663641.44 E 0.556 2255.71
5355.82 41.110 356.830 4431.77 4495.88 2213.88 N 763.16 W 5978943.11 N 663636.12 E 1.561 2317.49
5451.42 40.820 356.640 4503.96 4568.07 2276.45 N 766.73 W 5979005.59 N 663631.18 E 0.330 2379.63
5547.61 40.490 356.780 4576.94 4641.05 2339.01 N 770.33 W 5979068.06 N 663626.21 E 0.356 2441.76
5642.48 40.130 356.070 4649.28 4713.39 2400.27 N 774.15 W 5979129.22 N 663621.04 E 0.615 2502.65
------- ---- -- -~--
------
8 November, 2001 - 10:53
Page 3 of 6
Dril/QlIest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for E-102 MWD
Your Ref: API 500292304200
Job No. AKMM11169. Surveyed: 28 October. 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
.
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
5738.27 39.770 356.100 4722.71 4786.82 2461.63 N 778.35 W 5979190.48 N 663615.50 E 0..376 2563.72 ~.-o=~
5834.72 40.690 356.650 4796.35 4860.46 2523.80 N 782.29 W 5979252.54 N 663610.20 E 1.022 2625.53
5929.51 40.760 357.540 4868.19 4932.30 2585.56 N 785.42 W 5979314.22 N 663605.71 E 0.617 2686.79
6025.66 40.130 357.200 4941.36 5005.47 2647.87 N 788.28 W 5979376.45 N 663601.48 E 0.694 2748.53
6121.34 39.790 357.470 5014.70 5078.81 2709.25 N 791.14 W 5979437.76 N 663597.28 E 0.399 2809.37
6218.05 39.480 356.790 5089.18 5153.29 2770.87 N 794.23 W 5979499.29 N 663592.84 E 0.551 2870.47
6312.42 39.290 357.120 5162.11 5226.22 2830.66 N 797.41 W 5979559.00 N 663588.35 E 0.300 2929.81
6410.03 40.620 357.550 5236.94 5301.05 2893.28 N 800.32 W 5979621.53 N 663584.07 E 1.392 2991.87
6506.36 40.970 357.950 5309.86 5373.97 2956.17 N 802.79 W 5979684.35 N 663580.22 E 0.453 3054.11
6601.77 41.550 356.550 5381.59 5445.70 3019.01 N 805.81 W 5979747.12 N 663575.82 E 1.143 3116.41
6636.10 41.690 356.920 5407.25 5471.36 3041.77 N 807.11 W 5979769.85 N 663574.02 E 0.824 3139.02
6732.46 42.150 357.410 5478.95 5543.06 3106.07 N 810.29 W 5979834.06 N 663569.43 E 0.586 3202.78
6828.34 42.430 358.140 5549.88 5613.99 3170.54 N 812.80 W 5979898.46 N 663565.51 E 0.590 3266.58
6924.50 42.440 358.180 5620.85 5684.96 3235.39 N 814.88 W 5979963.25 N 663562.00 E 0.030 3330.67
7020.03 42.620 357.780 5691.25 5755.36 3299.93 N 817.16 W 5980027.72 N 663558.31 E 0.340 3394.50
7116.43 42.890 357.910 5762.03 5826.14 3365.32 N 819.62 W 5980093.04 N 663554.42 E 0.295 3459.20
7212.28 43.250 357.860 5832.05 5896.16 3430.73 N 822.03 W 5980158.38 N 663550.57 E 0.377 3523.91
7307.75 43.470 358.250 5901.46 5965.57 3496.24 N 824.26 W 5980223.83 N 663546.91 E 0.363 3588.68 .-....
7403.87 43.960 357.850 5970.93 6035.04 3562.63 N 826.52 W 5980290.15 N 663543.19 E 0.585 3654.32
7499.38 44.140 357.920 6039.58 6103.69 3628.99 N 828.97 W 5980356.44 N 663539.28 E 0.195 3719.97
7595.69 44.370 356.870 6108.56 6172.67 3696.13 N 832.03 W 5980423.50 N 663534.76 E 0.797 3786.50
7691.74 44.060 356.240 6177.41 6241.52 3762.99 N 836.05 W 5980490.25 N 663529.27 E 0.560 3852.93
7787.30 43.610 357.010 6246.34 6310.45 3829.05 N 839.95 W 5980556.22 N 663523.92 E 0.730 3918.57
7882.89 43.590 355.780 6315.56 6379.67 3894.84 N 844.09 W 5980621.90 N 663518.33 E 0.888 3983.97
7977.94 43.290 355.690 6384.58 6448.69 3960.02 N 848.95 W 5980686.95 N 663512.04 E 0.322 4048.90
8074.10 42.960 355.500 6454.76 6518.87 4025.56 N 854.00 W 5980752.37 N 663505.56 E 0.369 4114.23
8170.06 42.370 355.740 6525.32 6589.43 4090.40 N 858.97 W 5980817.08 N 663499.17 E 0.638 4178.86
8267.16 41 .790 355.800 6597.39 6661.50 4155.30 N 863.77 W 5980881.86 N 663492.95 E 0.599 4243.51
8363.97 41.520 355.850 6669.72 6733.83 4219.47 N 868.45 W 5980945.91 N 663486.86 E 0.281 4307."3
8459.33 40.930 356.370 6741.45 6805.56 4282.17 N 872.72 W 5981008.50 N 663481 .22 E 0.715 4369.82
----- - - - - _m -
- ------
8 November, 2001 - 10:53
Page 4 of 6
Dril/Quest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for E-102 MWD
Your Ref: API 500292304200
Job No. AKMM11169, Surveyed: 28 October, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates' Global Coordinates Dogleg Vertical
.
Depth Incl. Azlm. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
8555.93 40.380 356.730 6814.73 6878.84 4344.99 N 876.51 W 5981071.23 N 663476.05 E 0.619 4432.24 ~."--
8649.80 39.920 355.830 6886.48 6950.59 4405.39 N 880.43 W 5981131.52 N 663470.80 E 0.789 4492.31
8745.61 39.540 355.790 6960.17 7024.28 4466.46 N 884.91 W 5981192.48 N 663464.99 E 0.398 4553.14
8842.49 39.030 356.190 7035.15 7099.26 4527.65 N 889.20 W 5981253.57 N 663459.36 E 0.588 4614.06
8938.96 38.450 355.770 7110.40 7174.51 4587.87 N 893.43 W 5981313.68 N 663453.81 E 0.660 4674.01
9035.19 37.630 355.660 7186.19 7250.30 4647.00 N 897.86 W 5981372.70 N 663448.08 E 0.855 4732.93
9131.66 36.780 356.430 7263.02 7327.13 4705.20 N 901.88 W 5981430.79 N 663442.78 E 1.005 4790.85
9226.71 36.200 355.890 7339.44 7403.55 4761.59 N 905.67 W 5981487.09 N 663437.76 E 0.697 4846.96
9321.39 35.430 355.940 7416.21 7480.32 4816.86 N 909.61 W 5981542.25 N 663432.60 E 0.814 4901.99
9418.88 34.760 355.560 7495.98 7560.09 4872.75 N 913.77 W 5981598.04 N 663427.22 E 0.723 4957.67
9514.85 34.210 355.440 7575.09 7639.20 4926.92 N 918.03 W 5981652.11 N 663421.77 E 0.577 5011.68
9611.44 33.770 355.450 7655.17 7719.28 4980.75 N 922.32 W 5981705.83 N 663416.31 E 0.456 5065.37
9705.71 33.330 355.250 7733.74 7797.85 5032.68 N 926.54 W 5981757.65 N 663410.94 E 0.481 5117.17
9802.56 32.510 355.850 7815.03 7879.14 5085.15 N 930.63 W 5981810.02 N 663405.71 E 0.911 5169.48
9897.72 31.080 355.230 7895.91 7960.02 5135.14 N 934.52 W 5981859.91 N 663400.72 E 1.541 5219.31
9993.72 30.020 356.370 7978.59 8042.70 5183.80 N 938.10 W 5981908.48 N 663396.07 E 1.258 5267.79
10089.11 30.160 356.720 8061.12 8125.23 5231.54 N 940.98 W 5981956.15 N 663392.14 E 0.235 5315.22
10185.09 29.970 355.520 8144.19 8208.30 5279.51 N 944.24 W 5982004.03 N 663387.84 E 0.657 5362.96 ~
10248.77 29.520 355.560 8199.48 8263.59 5311.01 N 946.69 W 5982035.47 N 663384.69 E 0.707 5394.36
10315.00 29.520 355.560 8257.11 8321.22 5343.54 N 949.22 W 5982067.94 N 663381.45 E 0.000 5426.79 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Structure Reference. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.576° (11-0ct-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 349.230° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 10315.00ft.,
The Bottom Hole Displacement is 5427.20ft., in the Direction of 349.927° (True).
-- -"
8 November, 2001 - 10:53
Page 5 of 6
DrillQuest 2.00.08.005
North Slope Alaska
Comments
'-
Measured
Depth
(ft)
10315.00
Sperry-Sun Drilling Services
Survey Report for E-102 MWD
Your Ref: API 500292304200
Job No. AKMM11169, Surveyed: 28 October, 2001
8:)
~
5343.54 N
Survey tool program for E-102 MWD
Alaska Drilling & Wells
PBU WOA E Pad
Station Coordinates
TVD Northings Eastings
~ ~ ~
8321.22
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
153.00
8 November, 2001 - 10:53
0.00
153.00
To
Measured Vertical
Depth Depth
(ft) (ft)
153.00
10315.00
153.00
8321.22
~ -~------------
Comment
,~-...
949.22 W
Projected Survey
Survey Tool Description
Tolerable Gyro
MWD Magnetic
-~
Page 6 of 6
DrlllQllest 2.00.08.005
"-
17c,-0.30
ICf'¡-:l.Jlp
;)'01-03
;1.ol...18<ø
r ~ ~- D,;l&.-
..-~
12/12/01
Se..'.pgeP
NO. 1688
Alaska Data & Consulting Services
3940 Arctic Blvd. Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrfe
Company:
State of Alaska
Alaska 011 & Gas Cons Comm
Attn: LIsa Weepie
333 West 7th Ave. Suite 100
Anchorage. AK 99501
Field: Prudhoe Bay
Well
Job #
Log Description
Date
Bluellne
Sepia
Color
Prints
CD
D.S. 4-09 INJECTION PROFILE 11/29/01 1 1
D.S. 11-38A LEAK DETECTION LOG 11/27/01 1 1
D-18A 21495 SCMT 11/08/01 2
E-l 02 21500 USIT 10/30/01 2
D.S. 4-19 21504 SCMT 11/21/01 2
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage. Alaska 99508
RECEIVED
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
ReceiV~ ~
DEC 2 1 2001
Date Delivered:
Alaska QI & Gas Cons. ~ssiOf
AJdJorage
Re: FW: E 102;
!Ii
¡
(
Subject: Re: FW: E 102i
Date: Mon, 29 Oct 2001 10:29:31 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Wesley, Dave E" <WesleyDE@BP.com>
~O t- \, <6 \.0
Dave,
I left you a voice message. It appears that you have valid information for changing the XS
factor. Your proposal looks reasonable. Good luck.
Tom Maunder
"Wesley, Dave E" wrote:
> Tom,
> I've included some information from the rig to show the calculated
> volume. We will only be cementing to 1000' above the Kuparuk, which is
> approximately to 9000' md. I initially designed the well program with the
> "standard" 30% excess cement volume. Due to running close to the prognosed
> frac gradient of 12 ppg, we'd like to reduce the excess cement volume to
> 10%. Is this acceptable? What more information can I get you?
>
> Thanks
>
> Dave Wesley, Jr.
> Operations Drilling Engineer
> GPB Rotary Drilling
> 907 564 5773 Office
> 9074408631 Cell
> 907 564 4040 Fax
> wesleyde@bp.com
>
> > -----Original Message-----
> > From: Vaughan, Lance A (Fairweather)
> > Sent: Sunday, October 28,2001 6:42 PM
> > To: Wesley, Dave E
> > Cc: NSU, ADW Drlg Rig 14
> > Subject: E 102i
»
> > Dave,
> > For your info.
»
»
»
> > «Acal hole volume E-102i.ZIP»
> > recorded. ZIP> >
»
»
> > Lance Vaughan
> > Drilling Representative Doyon 14
> > 907 659 4835
»
>
> ------------------------------------------------------------------------
> Name: Acal hole volume E-102i.ZIP
> Acal hole volume E-102i.ZIP Type: Zip Compressed Data (application/x-zip-compressed)
«E-102i Acal
1of2
11/26/01 10:00 AM
,(
(
~1f~1fŒ (ill~ !Æ~!Æ~~!Æ
AlAS IiA 0 IL AND GAS
CONSERVATI ON COltDlISSION
I
I
/
/
TONY KNOWLES, GOVERNOR
333 W. P' AVENUE. SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Dan Stone
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage AK 99519-6612
Re:
Prudhoe Bay Unit E-1 02
BP Exploration (Alaska) Inc.
Permit No: 201-186
Sur Loc: 4962' FSL, 500' WEL, Sec. 06, T11N, R14E, UM
Btmhole Loc. 5109' NSL, 1509' WEL, Sec. 31, T12N, R14E, UM
Dear Mr. Stone:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required
permitting determinations are made.
Annular disposal has not been requested as part of the Permit to Drill application for Prudhoe Bay Unit E-
102.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the
mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC
25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the
BOPE test performed before drilling below the surface casing shoe, must be given so that a representative
of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum
field inspector on the North Slope pager at 659-3607.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient
notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a
test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission
petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
& ~/~~: ~.
cam~hsli Taylor
Chair
BY ORDER OF THE COMMISSION
DATED this 20th day of September, 2001
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
,(
( STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
IBI Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
IBI Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 020 AAC 25.050 Requirements
Contact Engineer Name/Number: Dave Wesley, 564-5773 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is true and correct to the best of my knowledge I )
Signed Dan Stone ~ '-:/ -- ~.. /~ Title Senior Drilling Engineer Date 'ì) :¿ f ~ t
"""',':':':;::::~,,::':,',:':';:.,::: ",,:':::' ::."::':}:.::,,: ",,::';:'::;,,/'::':\C':~;m','.':';m"J:iis"'"'s':"'I:o'."'n'!::U:~:e:'IS~I~'::!<:":':,,::.':'::i':.:;::;';'," "'::/',;:;,:;:':':::, :<:":'" ..,'!:e',',;",,',::";,:,;,:';¡':::'::;,,;::;"':',';:,;.:::,:"
',c"" ,':";":"""'",',,;':,,"':":':":""'.""!"':,..,::-':':,:'::;"'::.":"'>:;:"C,'::';:'{'::"',':,',::,:,:,:i,:':",""","":"""";:<"':':':"~"','.'."'"""',,,;.',:"..,'I!""":,~~:':,I""':',¡':::';':::' ,:,":',::"'::", :"!:::":';'::,c";,,,:,:"":',"',,,,,".C:,C'¡"':::,',;",:,,'¡:'::.:,:,
Permit Number2ð/_/ßþ :~I ~~q.r :2-30l./Z--00 ~~~I~D~t~ ~~:~ho:re;el~~i~~ments
Conditions of Approval: Samples Required 0 Yes iii No Mud Log Required' 0 Yes G:1 No
Hydrogen Sulfide Measures 0 Yes [i] No Directional Survey Required ŒI Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K ~K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: M \T 1?~~ Q~\\-\-.-l Lo,
0 . J by order of
",iilal Sitø8d BW ~ Ï\ ~iVlllmiæi(þner I the commission
-.;ammy Uecbsli J r\ LJ II \11-\ L
1 a. Type of work II Drill 0 Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
4962' FSL, 500' WEL, SEC. 06, T11 N, R14E, UM
At top of productive interval
4929' NSL, 1495' WEL, SEC. 31, T12N, R14E, UM
At total depth
5109' NSL, 1509' WEL, SEC. 31, T12N, R14E, UM
12. Distance to nearest property line 13. Distance to nearest well
ADL 028277,3352' MD E-10Ais599'awayat41.45'MD
16. To be completed for deviated wells
Kick Off Depth 300' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casino Weicht Grade CouDlina
20" 91.5# H-40 Weld
10-3/4" 45.5# L-80 BTC-M
7 -5/8" 29.7# L-80 BTC-M
1 b. Type of well
Hole
30"
13-1/2"
9-7/8"
Lenath
80'
4393'
10290.
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
feet
feet
feet
feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Perforation depth: measured
true vertical
20. Attachments
Approved By
Form 10-401 Rev. 12-01-85
(
>IN. ,r
(}"'f'/ù \
,\ \.
Á
'Y à-U
0 Exploratory 0 Stratigraphic Test II Development Oil
0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (OF or KB) 10. Field and Pool
Plan RKB = 64.7' Prudhoe Bay Field / Midnight
6. Property Designation o'Li~:J"'I ¡. Sun
ADL 028299 À 1>
7. Unit or Property Name 11. Type Bond (See 20 MC 25.025)
Prudhoe Bay Unit
8. Well Number
E-102
9. Approximate spud date
10/05/01 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 10290' MD / 8243' TVD
17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
0
41 Maximum surface 2603 psig, At total depth (TVD) 7970' / 3400 psig
Setting Depth
TOD Bottom
MD TVD MD TVD
Surface Surface 133' 133'
Surface Surface 4393' 3780'
Surface Surface 10290. 8243'
Number 2S100302630-277
Ouantitv of Cement
(include staae data)
260 sx Arctic Set lApprox.)
755 sx AS Lite 3, 312 sx Class 'G'
327 sx Class 'G'
Plugs (measured)
Junk (measured)
Cemented
MD
TVD
RE.CErVE,D
SEP 1 3 2001
-
Alaska Oil & Gas Cons. Commission
,Anchorage
" '
Date
1.;2.(,0 (
Submit In Triplicate
(
(
IWell Name:
IE-102i
Drill and Complete Plan Summary
l.!ïPe of Well (service I producer I injector}.:.j Pre-Produced Injector
Surface Location: X = 664,448.00 Y = 5,976,747.00
Esti mated 316' FNL, 500' FEL Sec. 6, T11 N, R14E Umiat
Target Location: X = 663,320.00 Y = 5,981,970.0 TVDss 7970
Kuparuk "C" sands 349'FNL,1495'FEL Sec. 31, T12N, R14E Umiat
Bottom Hole Location: X = 663,300.90 Y = 5,982,149.02 TVDss 8178
270' FNL, 1510' FEL Sec. 31, T12N, R14E Um
I AFE Number: 15M0508
1 Estimated Start Date: 110/05/2001 I
~ Doyon 14
l.Qperatin~s to complete: 119.51
I MD: 110,290' I
I TVD: 18243.' I
1 BF/MS: 132.0' 1
1 AKa: 164.7'
1 Well Desi~(conventional, slim hole, etc.}.J 10 3A" x 7 5/8" SH-LS (5 Y2" X 4 Y2" tubingLJ
~ective: 1
Kuparuk Formation (C - Sand)
Mud Program:
13 1/2" Surface Hole 0-4393' :
Initial
below -2000' MO
interval TO
Fresh Water Surface Hole Mud
API FL f.tl
mls/30min
15 - 20
<10
<10
8.5 - 9.5
8.5 - 9.5
8.5 - 9.5
9 7/8" Intermediate I Production Hole (4393' - 10290'): Fresh Water LSND
Interval Density Viscosity PV YP pH API HTHP
(ppg) (seconds) Fi Itrate Fi Itrate
Surface <10 by
shoe to 9.5 40 - 60 8 - 12 20 - 25 8.5-9.5 4-6 HAZ
HAl
HAl to TD 10.3 40 - 60 10-16 20 - 25 8.5 - 9.5 3-5 <10
E-102i
Page 1
~(
Di rectional:
Ver. Sper -Sun WP-06
KOP: 300'
Maximum Hole Angle:
Close Approach Wells:
Lo
I ntermediate/Prod uction
Hole
(
40.80° from 2828' MD - 10290' MD
All wells pass major risk criteria. However, E-100 and E-
10A are close in the surlace hole section; E-100 is 31.28'
ctr-ctr @ 1001', and E-10A is 41.45' ctr-ctr @ 599'. A
surlace ro will be re uired to a roximatel 1000'.
Drilling: MWD / GR
Open Hole: Gyro (SSDS Photo) (-1000' MD)
Contingency.
Cased Hole: None
Drilling: MWD/G R/P4Res/PWD/(Recorded
Neu/Den.)
Open Hole: None
Cased Hole: USIT
Formation TVDss TVDrkb Estimated pore pressure, PPG
Tops
Base Gubik 483 547.7
Base Permafrost 1825 1889.7
SV6 1875 1939.7
Mid-Eocene Unconf. 2755 2819.7
SV5 2885 2949.7
SV4 3125 3189.7
SV3 3615 3679.7 .... ~ t t":i.\ ~"'~'\ .'.\
SV2 3795 3859.7 -.. ." -' ,-~ ......- ---... '-.J . ---
SV1 4170 4234.7
Top UGNU (UG4A) 4680 4744.7
UG3 4915 4979.7
UG1 5410 5474.7
WS2/ Schrader N 6010 6074.7
WS11 Schrader 0 6240 6304.7
Top Colville (CM3) 6415 6479.7 JI!l. - ba ,,"'""-- - "'"' "-.ð-( "'t"'l "",-
CM2 7720 7784.7 - a '-"'---.;;;T ~-- . 'Y
CM1ITHRZ 7860 7924.7
BHRZI Top Kalubik 7965 8029.7
Kuparuk UB 7970 8034.7 3200 - 3400 psi (7.7 - 8.2 PPQ)
Kuparuk UA 7980 8044.7
OGOC 8010 8074.7
Kuparuk LB 8025 8089.7
BKUPITMLV 8065 8129.7
TO Criteria 150' below Miluveach too
E-102i
Page 2
(
(
C
8
IT b8
p
aSln!JJ u Ing rogram:
Hole Casing! WtlFt Grade Conn Length Top Btm
Size Tbg O.D. MDITVD MDITVD bkb
30" 20" 91.5# H-40 WLD 80' GL 133'/133'
13 Y2" 1 0 3/4" 45.5# L-80 BTCM 4393' GL 4393'/3780'
97/8" 7 5/811 29.7# L-80 BTCM 1 0290' GL 10290'/8243'
Tubing 5 Y2" 17.0# L-80 SL-HC -9900' GL 9800'/7845'
Tubing 4 Y211 12.6# L-80 SL-HC -100' 9800'/7845' 9900'/7930'
Cement Calculations:
The following surface cement calculations are based upon a single stage job using a port collar as
contingency if cement is not circulated to surface.
Casin Size 10 3/4" Surface
Basis: Lead: Based on 1978' of annulus in the permafrost @ 250% excess and 1755' of open
hole from top of tail slurry to base permafrost @ 30% excess.
Lead TOG: To surface
Tail: Based on 500' TVD open hole volume + 30% excess + 80' shoe track volume.
Tail TOG: At -3733' MD 3280' TVDbkb .
Total Cement Volume: Lead 597 bbl I 3352 ft 1755 sks of Dowell ARTIGSET Lite 3 at
10.7 and 4.44 disk.
Tail 64 bbl I 359 ft 1312 sks of Dowell Premium 'G' at 15.8
and 1 .15 disk.
7 5/8" Production Longstring
Tail: Based on TOG 1000' MD above top of Kuparuk target and 30% excess + 80' shoe
volume
Tail TOG: 9015' MD, 7278' TVDbkb
Total Cement Volume:
Tail
67 bbls I 376 ft I 327 sks of Dowell Premium 'G' at 15.8
and 1 .15 disk.
E-102i
Page 3
('
(
Well Control:
Surface hole will be drilled with diverter. The intermediate hole, well control equipment
consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures. Based upon
calculations below BOP equipment will be tested to 4000 psi
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Production Interval-
. Maximum anticipated BHP:
. Maximum surface pressure:
3400 psi @ 7970' TVDss - Kuparuk UB
2603 psi @ surface
(based on BHP and a full column of gas from TO @ 0.10 psi/ft)
. Planned BOP test pressure:
. Planned completion fluid:
4000 psi
8.6 ppg filtered seawater / 6.8 ppg Diesel
Disposal:
. No annular injection in this well.
. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind
and inject at DS-04.
. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-
04 for injection. Haul all Class I wastes to Pad 3 for disposal.
E-102i
Page 4
((
(
DRILL AND COMPLETE PROCEDURE SUMMARY
Pre-Rig Work:
The 20" conductor needs to be set.
1. Weld an FMC landing ring for the FMC Slim hole wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move.
3. Ensure any required plugs and lor well shut-ins have been accomplished in nearby wells for rig move
and close approach concerns.
Rig Operations:
1. MIRU Doyon 14.
2. Nipple up diverter spool, and function test the diverter. PU 5" DP as required and stand back in
derrick.
3. MU 13 1/2" drilling assembly with MWD/GR and directionally drill surface hole to approximately 4393'
MD I 3780' TVD. The actual surface hole TD will be +1-100' TVD below the top of the SV3 sands.
4. Run and cement the 10 3/4", 45.5 Iblft. surface casing back to surface. A TAM Port collar or stage
tool will be run in the casing string to allow secondary cementing, in the event cement is not circulated
to surface during primary cementing operations.
5. ND diverter spool and NU casing I tubing head. NU BOPE and test to 4000 psi.
6. MU 9 7/8" drilling assembly with MWD/GR/P4Res/Neu/Den/PWD and RIH to float collar. Test the 10
3/4" casing to 3500 psi for 30 minutes.
7. Drill new formation to 20' below 10 3/4" shoe and perform Leak Off Test.
8. Drill ahead to a depth of -150' md below base Kuparuk. Condition hole for casing run, as needed,
and POOH.
9. There exists a contingency to run CMR log across Kuparuk, if heavy oil is identified.
10. Run and cement the 7 5/8" production casing as required to cover all significant hydrocarbon intervals.
Displace the casing with seawater during cementing operations and freeze protect the 7 5/8" x 10 3/4"
annulus as required.
11. Test the casing to 4000 psi for 30 min.
12. R/U Schlumberger; Run a USIT log, as required for an Injector well.
13. Run the 5 1/2" X 4 Y2", L-80, wI premium connections, completion assembly. Test the production
casing/tubing annulus to 4000 psi and the tubing to 4000 psi.
14. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
15. Freeze protect the well to -2200' and secure; set BPV and test to 500 psi.
16. Rig down and move off.
Estimated Spud Date:
10105/2001
E-1 02i
Page 5
~'
(
E-102i
Job 1: MIRU
Hazards and Contingencies
~ Standard Operating Procedures for H2S precautions should be followed at all times.
The highest level of H2S recently measured on E-pad was <50 ppm, (1999). The closest
wells, regarding SHL, are E-10 and E-100, each measuring <10 ppm at last testing, (1999).
The closest wells, regarding BHL are E-100 and E-101, each measuring <10 ppm.
~ The closest surface locations are E-10 and E-100, each at 37' from well E-102i. No surface shut-
in's will be required.
~
Reference RPs
.:. "Drilling/ Work over Close Proximity Surface and Subsurface Wells Procedure"
Operational Specifics:
. Notify AOGCC 24 hours advance for BOP test witness.
. Post drilling permit with summary of drilling hazards in doghouse prior to spud.
. Review the E-Pad data sheet & post in doghouse & field office.
Job 2: Drillina Surface Hole
Hazards and Contingencies
~ No faults crossings are expected in the surface interval of E-102i.
~ There are two "close approach" issues in the surface hole. All wells pass major risk criteria. The
closest wells are E-10A at approximately 41' center-to-center at 599' MD and E-100 at
approximately 31' center-to-center at 1001' MD. Have the SSDS Photo Gyro on hand as a
contingency, in the event magnetic interference affects MWD directional.
~ The SV4 sand may contain gas hydrates, though little or none are expected. Hydrates will be
treated at surface with appropriate mud products.
Reference RPs
.:. "Well Control Operations Station Bill"
.:. "Golden Rules" of surface hole drilling. See Attached document.
.:. Top hole "Blow-n-Go" strategy. See Attached document.
Operational Specifics: \ "\ \ ':>
. Drill bit 9 7/81~' (TBD)Smith FGSH+. Two bits will be on location due to the likelihood that
one bit will not successfully drill to section TO/casing point at 3425' MD. Plan to make a trip to
surface at the base of the Permafrost for a bit change. Jet sizes and numbers, and corresponding
hydraulics calculations will accompany as separate document.
. BHA: See attached Sperry-Sun recommendation for 78" - 1.2283° bend angle, 7/86/7 lobe, 64
stage motor, DIR/GR.
. Utilize Sperry-Sun Photo-Gyro to approximately 1000' md; until beyond surface hole close
approach wells ~ and ~ 0
e--,D Co\ ~ -\C
. Refer to attached mud program for flow rate velocities, ECO's and other operational specifics and
contingencies.
.
Maintain the geologist on-site tor casing point determination.
TOP HOLE STRA TEGY - Reference the e-mail of August 1, from Gavin Kidd. In particular,
.
E-102i
Page 6
('
~i
I,
a.) Optimize flow rate- especially below the permafrost.
b.) Optimize connection practices and HHSI at the bit.
c.) Drop the viscosity to the 200 - 250 range, below the permafrost.
.:. Consider coming straight out of the hole at section TO to run casing.
Job 3: Install Surface Casina
Hazards and Contingencies
~ It is critical that cement is circulated to surface for well integrity. 250% excess cement through the
permafrost zone (and 30% excess below the permafrost) is planned. As a contingency, a 10 3/4"
TAM port collar will be positioned at :t1 OOO'MD to allow a secondary circulation as required.
Reference RPs
.:.
Operational Specifics:
.
Job 7: Drillina Intermediate I Production Hole
Hazards and Contingencies
~ E-102i will not cross any faults.
~ The surface casing point is chosen just below the SV3 sands, leaving the SV1 exposed for the 9
7/8" hole. Differential sticking across the SV-1 sands has not been identified as a major issue,
though the potential exists.
~ KICK TOLERANCE: In the worst case scenario of 8.2 ppg pore pressure at the Kuparuk target
depth, a fracture gradient of 12.5 ppg at the surface casing shoe, and 10.3 ppg mud in the hole,
the kick tolerance is 173.3 bbls.
~ The mud program states that the mud weight will be 9.5 ppg from drill out of the surface shoe to
above the HRZ. The mud weight will be increased to 10.3 ppg to drill the HRZ and maintained to
TO. Due to an expected Kuparuk pressure of 3200 to 3400 psi (8.0 - 8.2 ppg), attention to
possible lost circulation and differential sticking is essential.
Reference RPs
Operational Specifics
.
-" . """,.." , " ,.,.. """, ~"'.,"""~..,-,."
'" ., .. "'",_.,,"'"
'" -"."",.._, "
""'" "".".., """""...., "".",,-,
'" " ,. "OM """.
Job 8: Loa Production Hole
E-102i
Page 7
(
(
Hazards and Contingencies
~ No production hole logging program is planned for this well.
~ Reference RPs
Job 9: Case & Cement Production Hole
Hazards and Contingencies
~ The Ugnu and Schrader are expected to be wet. For this reason the 7 5/8" casing will be
cemented to 1000' md above the Kuparuk reservoir (the uppermost significant hydrocarbon). The
top of the hydrocarbon interval should be verified with LWD resistivity log.
)- The well will be underbalanced after displacing the cement with Sea Water. Verify that the Floats
are holding before continuing operations and hold pressure on the well if they are not holding.
Reference RPs
.:.
Operational Specifics:
.
,""""...,...."
"',""""",""""""",,,,"""" ""'" " ...
Job 12: Run Completion
Hazards and Contingencies
)- No hazards specific to this well have been identified for this phase of the well construction.
Reference RPs
.:.
Operational Specifics:
Job 13: ND/NU/Release Ria
Hazards and Contingencies
)- No hazards specific to this well have been identified for this phase of the well construction.
Operational Specifics:
E-102i
Page 8
I
C
5pei""'~-5u" North Slope Alaska
DRILLING SERVices Alaska Drilling & Wells
A Halllbur1on Company
Scale: 1 inch = 1000ft
0 1000
1000
2000
3000
..c::
-
a.
Q)
0 4000
rn
.2
1:::
Q)
>
5000
6000
7000
8000
DriliQuest 2.00.09.003
Vertical Section
2000 3000
0
Assume Vertical @ MSL
: 300.ooft MD, 300.ooft TVD
00.00
Increase in Dir Rate @ 2.oo00/1O0ft : 7oo.00ft MD, 699.68ft TVD
Increase in Dir Rate @ 3.0000/1ooft: 1005.0Oft MD, 1002.27ft TVD
End Dir, Start Sail @ 31.000° : 1818.29ftMD,1752.62ftTVD
00.00
Begin Dir @ 4.0000/100ft
: 2048.56ft MD, 1950.00ft TVD
End Dir, Start Sail @ 40.803° : 2828.81ftMD,2595.76ftTVD
10 3/4" Casing
4392.89ft MD
3779.70ft TVD ~'Y
~
':....
'.. ..
.... ..
Fault 1
c.,.,.,.""
.... ..
Current Well Properties
Well: E.102 WP6
Horizontal Coordinates:
Ref. Global Coordinates: 5976747.00 N, 664448.00 E
Ref. Structure Reference: 3542.24 N, 1987.21 E
Ref. Geographical Coordinates: 70020' 33.9877" N, 148039' 55.0225" W
RKB Elevation:
64.70ft above Mean Sea Level
64.70ft above Structure Reference
True North
Feet (US)
North Reference:
Units:
(
PBU- WOA E Pad
E-102 WP6
Drill Quest'"
Section Azimuth: 349.230° (True North)
4000 5000
bp
~_~d¥
," w.
: ;
II It,.
IIID
.. .... ."'IIEIØ
..
.. ..
:.. ..
:'....
.... ..
«'-:....
~ 9600.00
B.IO2 1'1 Driiler's «i,~ 95% ~6'
8034.70 lTD, 5246.22 N, J()j4.S5 H' '\,.."...",.
E..l 02 1'1
8fJ3-1JO TV/), 52-16-49 N, IOn,16 W
0 1000
Scale: 1 inch = 1000n
2000 3000
Vertical Section
4000
0
1000
2000
3000
..c::
-
a.
Q)
4000 0
rn
0
1:::
Q)
>
5000
6000
7000
8000
7 5/8' Casing
10289.5911 MD
8243.2411 TVD
5000
Section Azimuth: 349.230° True North
~.
spe"""",v-sul1 North Slope Alaska
DRILLING seRVIc:es Alaska Drilling & Wells
A Halliburton Compony
.BIII
.PllIIII..IWlI & WEllS
DrillQuest 2.00.09.003
5600
4900
4200
3500
(/)
0>
c:
.- 2800
.c.
1::
0
Z
Eastings
-700
(
PBU- WOA E Pad DrillQuest"
E-102 WP6
0
bp
~~~.
.. ..-
.. .
...
1ft-'
Total Depth: 10289.59t1MD.8243.24ItTVD
7 518' Casing
/10289.5911 MD
8243.2411 TVD
~E-l(j2 n f)ril!eJ"\ Qì., lJ5~;r
81)34.70 ¡Y/), 5246.22 N. 10/-1.55 It'
2100
1400
700
0
--
.CYJ
7400.00
6900.00
6400.00
5900.00
5400.00
4900.00
4400.00
3900.00
,r
3400.00
2900.00
Current Well Properties
Well: E-102WP6
Horizontal Coordinates:
Ref. Global Coordinates: 5976747.00 N, 664448.00 E
Ref. Structure Reference: 3542.24 No 1987.21 E
Ref. Geographical Coordinates: 70020' 33.9877" No 1480 39' 55.0225" W
RKB Elevation:
64.70ft above Mean Sea Level
64.70ft above Structure Reference
North Reference:
Units:
True North
Feet (US)
103/4'Caslng
4392.8911 MD
3779.7OtI TVD
---'End Dir, Start Sali @ 40.803' : 2828.81ftMD,2595.76ItTVD
-700
Scale: 1 inch = 700ft
Eastings
Begin Dlr @ 4.000'/10OtI : 2048.56ft MD, 1950.0011 TVD
/// /'End Dir, Start Sail @ 31.000': 1818.29ftMD,1752.621ITVD
/ /
"\.860.00 /1r1l.:rease In Dir Rate @ 3.000'/1O0fl: 1005.0011 MD, 1002.2711 TVD
I //Increase In Dir Rate @ 2.000'/10OtI: 700.00fl MD, 699.681t TVD
I .::"_---Begin Dlr @ 1.000'/10011 : 300.0OtI MD, 300.0Ott TVD
0
Reference is True North
~~
SAL REPORT
6 September, 2001
Your Ref: AS-Guessed
Surface Coordinates: 5976747.00 N, 664448.00 E (70020' 33.9877" N, 148039' 55.0225" W)
Kelly Bushing: 64.70ft above Mean Sea Level
~,
5pE!r"""Y-5UI!
DRILLING SERVIC:ES
A Halliburton Company
Proposal Ref: pro 10940
Sperry-Sun Drilling Services
Proposal Report for E-102 Plan - E-102 Wp6
Your Ref: AS-Guessed
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordina . Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings ' Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) . «>/100ft)
0.00 0.000 0.000 -64.70 0.00 0.00 N 0.00 E 59767 ~:~:~ ~ 0.00
64.70 0.000 0.000 0.00 64.70 0.00 N 0.00 E 597674.. 0.000 0.00 Assume Vertical @ MSL
100.00 0.000 0.000 35.30 100.00 0.00 N 0.00 E 5976747.0 664448.00 E 0.000 0.00 ~-.
200.00 0.000 0.000 135.30 200.00 O.OON 0.00 E. 5976747.00 664448.00 E 0.000 0.00
- 300.00 0.000 0.000 235.30 300.00 O.OON 0.00 E"'¡!!¡¡h5976747.00 N 664448.00 E 0.000 0.00 Begin Dir @ 1.0000/100ft
300.000 MD, 300.000 TVD
...
400.00 1.000 275.000 335.29 399.99 5976747.06 N 664447.13 E 1.000 0.24
500.00 2.000 275.000 435.26 499.96 5976747.23 N 664444.52 E 1.000 0.95
547.78 2.478 275.000 483.00 547.70 5976747.35 N 664442.65 E 1.000 1.46 Base Gubik
600.00 3.000 275.000 535.16 599.86 5976747.51 N 664440.16 E 1.000 2.13
700.00 4.000 275.000 634.98 699.6£1 5976747.91 N 664434.07 E 1.000 3.79 Increase in Dir Rate @ 2.000°/1000 :
700.00ft MD, 699.68ft TVD
800.00 5.945 799.29 2.46 N 22.47 W 5976748.97 N 664425.48 E 2.000 6.62
900.00 7.917 898.5q, 4.99 N 34.27 W 5976751.23 N 664413.63 E 2.000 11.30
1000.00 9.901 997.35 8.78 N 49.28 W 5976754.70 N 664398.54 E 2.000 17.84
1005.00 10.000 1002.27 9.00N 50.11 W 5976754.90 N 664397.70 E 2.000 18.21 Increase in Dir Rate @ 3.0000/100ft :
1005.00ft MD, 1002.27ft TVD
1100.00 12.778 1095.39 14.43 N 68.06 W 5976759.93 N 664379.64 E 3.000 26.89
1200.00 15.730 1192.31 22.62 N 91 .28 W 5976767.61 N 664356.25 E 3.000 39.28
1300.00 18.697 1287.82 33.34 N 118.86 W 5976777.72 N 664328.44 E 3.000 54.96
1400.00 21 .673 1381.66 46.55 N 150.73 W 5976790.23 N 664296.29 E 3.000 73.89 /~.
1500.00 24.655 1473.59 62.22 N 186.80 W 5976805.11 N 664259.88 E 3.000 96.03
1600.00 27.640 1563.35 80.31 N 226.98 W 5976822.31 N 664219.31 E 3.000 121.31
1679.00 30.000 295.000 1567.85 1632.55 96.27 N 261.55 W 5976837.51 N 664184.40 E 3.000 143.45
1700.00 30.119 296.235 1586.03 1650.73 100.82 N 271.04 W 5976841 .85 N 664174.82 E 3.000 149.69
1800.00 30.841 301 .978 1672.23 1736.93 125.49 N 315.29 W 5976865.54 N 664130.03 E 3.000 182.20
1818.29 31.000 303.000 1687.92 1752.62 130.54 N 323.22 W 5976870.42 N 664121.99 E 3.000 188.64 End Dir, Start Sail @ 31.000° :
1818.29ftMD ,1752.62ftTVD
1900.00 31 .000 303.000 1757.96 1822.66 153.46 N 358.52 W 5976892.56 N 664086.20 E 0.000 217.75
6 September, 2001 - 18:04
Page 2 of 12
DrillQuest 2.00.09.003
North Slope Alaska
Measured
Depth
(ft)
1978.21
2000.00
2036.54
2048.56
2100.00
2200.00
2300.00
2400.00
2500.00
2600.00
2700.00
2800.00
2828.81
2900.00
3000.00
3100.00
3124.65
3200.00
3296.39
3300.00
3400.00
3500.00
3600.00
3613.45
3700.00
3800.00
3900.00
4000.00
4100.00
4200.00
Incl.
31.000
31 .000
31.000
31.000
30.877
30.992
31 .567
32.577
33.982
35.737
37.791
40.098
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
Azim.
303.000
303.000
303.000
303.000
306.996
314.778
322.407
329.700
336.529
342.822
348.560
353.762
355.166
35
35
355.1
355.16
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
Sub-Sea
Depth
(ft)
1825.00
1843.68
1875.00
1885.30
1929.43
2015.24
2100.74
2185.51
2269.13
2351.21
36.34
2755.00
2812.03
2885.00
2887.73
2963.43
3039.12
3114.82
3125.00
3190.51
3266.21
3341.90
3417.60
3493.29
3568.99
Vertical
Depth
(ft)
1889.70
1908.38
1939.70
1950.00
1994.13
2079.94
2165.44
2250.21
2333.83
2415.c
2496;'
2573
2595.
2649.65
2725.34
2801 .04
2819.70
2876.73
2949.70
2952.43
3028.13
3103.82
3179.52
3189.70
3255.21
3330.91
3406.60
3482.30
3557.99
3633.69
Sperry-Sun Drilling Services
Proposal Report for E-102 Plan - E-102 Wp6
Your Ref: AS-Guessed
Local Coordinates
Northings Eastings
(ft) (ft)
175.40 N
181.51 N
191.76 N
195.13 N
210.29 N
487.18 N
549.25 N
567.85 N
614.21 N
679.32 N
744.44 N
760.49 N
809.55 N
872.32 N
874.67 N
939.78 N
1004.89 N
1070.01 N
1078.77 N
1135.12 N
1200.24 N
1265.35 N
1330.47 N
1395.58 N
1460.69 N
392.30 W
401.71 W
417.49 W
422.68 W
4461-.34 W
3.13W
.38W
~6.95 W
71.67 W
591 .43 W
606.14 W
615.72 W
617.52 W
621 .44 W
626.95 W
632.45 W
633.81 W
637.96 W
643.27 W
643.47 W
648.97 W
654.48 W
659.98 W
660.73 W
665.49 W
671.00 W
676.50 W
682.01 W
687.52 W
693.02 W
Global Coordinat~ .-, ",' ','
Northings ~!§~ing§ ""
(ft){{t.), ,'.' ""
5976,
597691 "'"
5976929.5!
5976932.81
4051i~5 E
~042:40 E
'4026.40 E
664021.14 E
".5976947.49 N
5976980.22 N
5977018.35 N
5977061.69 N
5977110.04 N
5977163.15 N
5977220.77 N
5977282.61 N
5977301.17 N
5977347.43 N
5977412.41 N
5977477.38 N
5977493.40 N
5977542.36 N
5977605.00 N
5977607.34 N
5977672.32 N
5977737.30 N
5977802.27 N
5977811.01 N
5977867.25 N
5977932.23 N
5977997.21 N
5978062.18 N
5978127.16 N
5978192.14 N
663999.15 E
663959.64 E
663924.54 E
663894.02 E
663868.23 E
663847.29 E
663831.32 E
663820.38 E
663818.17 E
663813.23 E
663806.30 E
663799.37 E
663797.66 E
663792.44 E
663785.75 E
663785.50 E
663778.57 E
663771 .64 E
663764.70 E
663763.77 E
663757.77 E
663750.84 E
663743.90 E
663736.97 E
663730.04 E
663723.10 E
Dogleg
Rate
(0/10Oft)
0.000
0.000
0.000
0.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0,000
Vertical
Section
245.61
253.38
266.40
270.68
289.62
329.86
374.47
423.22
475.88
532.18
591 .87
654.63
673,24
719.52
784.51
849,51
865.53
914.51
977.16
979.50
1044.50
1109.49
1174.49
1183.23
1239.49
1304.48
1369.48
1434.47
1499.47
1564.47
6 September, 2001 - 18:04
Page 3 of 12
Alaska Drilling & Wells
PBU_WOA E Pad
Comment
Base Permafrost
SV6
Begin Oir @ 4.0000/100ft
2048.56ft MO, 1950.000 TVO
---,
End Dir, Start Sail @ 40.803° :
2828.81 ftM 0 ,2595. 76ftTVO
Mid-Eocene Unconformity
SV5
~-
SV4
DrillQuest 2.00.09.003
Sperry-Sun Drilling Services
Proposal Report for E-102 Plan - E-102 Wp6
Your Ref: AS-Guessed
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordin~te~> '. . Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings ~Î~!ing~ .... .. Ràte Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) 'o{1;U?¡ . . (o/100ft)
4260.78 40.803 355.166 3615.00 3679.70 1500.27 N 696.37 W 0.000 1603.97 SV3
4300.00 40.803 355.166 3644.69 3709.39 1525.81 N 698.53 W 0.000 1629.46
4392.89 40.803 355.166 3715.00 3779.70 1586.29 N 703.64 W 0.000 1689.84 10 3/4" Casing /"'"- -.
4400.00 40.803 355.166 3720.38 3785.08 1590.92 N 704.03 W 0.000 1694.46
4498.58 40.803 355.166 3795.00 3859.70 1655.11 N 709.46 W . 0.000 1758.53 SV2
4500.00 40.803 355.166 3796.08 ... 597~387.07 N 663702.30 E 0.000 1759.45
3860.78 709.54 W
4600.00 40.803 355.166 3871.77 3936.47 5.05W 5978452.05 N 663695.37 E 0.000 1824.45
4700.00 40.803 355.166 3947.47 4012.17 O.55W 5978517.03 N 663688.44 E 0.000 1889.45
4800.00 40.803 355.166 4023.16 4087.86 W 5978582.01 N 663681.50 E 0.000 1954.44
4900.00 40.803 355.166 4098.86 4163.56 .56W 5978646.98 N 663674.57 E 0.000 2019.44
4993.98 40.803 355.166 4234... 19 736.74 W 5978708.05 N 663668.05 E 0.000 2080.52 SV1
5000.00 40.803 355.166 4239.26... 1981.61 N 737.07 W 5978711 .96 N 663667.64 E 0.000 2084.44
5100.00 40.803 355.166 4314.~? 2046.72 N 742.58 W 5978776.94 N 663660.70 E 0.000 2149.43
5200.00 40.803 355.166 4390.~1 2111.84 N 748.08 W 5978841 .92 N 663653.77 E 0.000 2214.43
5300.00 40.803 355.16 4466.34 2176.95 N 753.59 W 5978906.89 N 663646.84 E 0.000 2279.42
5400.00 40.803 4542.04 2242.06 N 759.10 W 5978971 .87 N 663639.90 E 0.000 2344.42
5500.00 40.803 4617.73 2307.18 N 764.60 W 5979036.85 N 663632.97 E 0.000 2409.42
5600.00 40.803 4693.43 2372.29 N 770.11 W 5979101.83 N 663626.04 E 0.000 2474.41
5667.73 40.803 4744.70 2416.40 N 773.84 W 5979145.84 N 663621.34 E 0.000 2518.44 UG4A
5700.00 40.803 4769.12 2437.41 N 775.61 W 5979166.81 N 663619.10 E 0.000 2539.41
~"
5800.00 40.803 355.166 4780.12 4844.82 2502.52 N 781.12 W 5979231.78 N 663612.17 E 0.000 2604.40
5900.00 40.803 355.166 4855.82 4920.52 2567.63 N 786.63 W 5979296.76 N 663605.24 E 0.000 2669.40
5978.19 40.803 355.166 4915.00 4979.70 2618.54 N 790.93 W 5979347.56 N 663599.82 E 0.000 2720.22 UG3
6000.00 40.803 355.166 4931.51 4996.21 2632.75 N 792.13 W 5979361.74 N 663598.31 E 0.000 2734.40
6100.00 40.803 355.166 5007.21 5071 .91 2697.86 N 797.64 W 5979426.72 N 663591 .37 E 0.000 2799.39
6200.00 40.803 355.166 5082.90 5147.60 2762.98 N 803.15 W 5979491 .69 N 663584.44 E 0.000 2864.39
6300.00 40.803 355.166 5158.60 5223.30 2828.09 N 808.65 W 5979556.67 N 663577.51 E 0.000 2929.38
6400.00 40.803 355.166 5234.29 5298.99 2893.20 N 814.16 W 5979621.65 N 663570.57 E 0.000 2994.38
6500.00 40.803 355.166 5309.99 5374.69 2958.32 N 819.66 W 5979686.63 N 663563.64 E 0.000 3059.38
6600.00 40.803 355.166 5385.69 5450.39 3023.43 N 825.17 W 5979751.60 N 663556.71 E 0.000 3124.37
6 September 2001 - 18:04
Page 4 of 12
Dri/lQuest 2.00.09.003
North Slope Alaska
Measured
Depth
(ft)
6632.12
6700.00
6800.00
6900.00
7000.00
7100.00
7200.00
7300.00
7400.00
7424.77
7500.00
7600.00
7700.00
7728.62
7800.00
7900.00
7959.81
8000.00
8100.00
8200.00
8300.00
8400.00
8500.00
8600.00
8700.00
8800.00
8900.00
9000.00
9100.00
9200.00
Incl.
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
Azim.
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.16
Sub-Sea
Depth
(ft)
5410.00
5461.38
5537.08
5612.77
5688.47
5764.16
5839.86
5915.55
5991.25
6010.00
6066.95
6142.64
6218.34
6240.ûO
3
35
355.
355.1
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
6672.51
6748.21
6823.90
6899.60
6975.29
7050.99
7126.68
7202.38
7278.08
7353.77
Vertical
Depth
(ft)
5474.70
5526.08
5601 .78
5677.47
5753.17
5828.86
5904.56
5980.25
6055.95
6074.70
6131
6207
6283
6304.
6358.
6434.43
6479.70
6510.12
6585.82
6661.52
6737.21
6812.91
6888.60
6964.30
7039.99
7115.69
7191 .38
7267.08
7342.78
7418.47
Sperry-Sun Drilling Services
Proposal Report for E-102 Plan - E-102 Wp6
Your Ref: AS-Guessed
Local Coordinates
Northings Eastings
(ft) (ft)
3044.35 N
3088.55 N
3153.66 N
3218.78 N
3283.89 N
3
3674.57 N
3739.69 N
3758.32 N
3804.80 N
3869.92 N
3908.86 N
3935.03 N
4000.15 N
4065.26 N
4130.37 N
4195.49 N
4260.60 N
4325.72 N
4390.83 N
4455.94 N
4521.06 N
4586.17 N
4651.29 N
4716.40 N
826.94 W
830.68 W
836.18 W
841.69 W
847.19W
8~12.70 W
8.21 W
.71 W
9.22W
70.58 W
874.73 W
880.23 W
885.7 4 W
887.31 W
891 .24 W
896.75 W
900.04 W
902.26 W
907.76 W
913.27 W
918.77 W
924.28 W
929.79 W
935.29 W
940.80 W
946.31 W
951.81 W
957.32 W
962.82 W
968.33 W
Global Coordinat~ .. ".'. '.
Northings E~§~ing~ ..
(ft)(ft) . ...' . ...
59797 .,
597981.."
"'"
5979881.5
5979946.54
5980011.52 N
598~076.49 N
5980141.47 N
5980206.45 N
5980271 .43 N
5980287.52 N
5980336.40 N
5980401 .38 N
5980466.36 N
5980484.95 N
5980531 .34 N
5980596.31 N
5980635.18 N
5980661 .29 N
5980726.27 N
5980791.25 N
5980856.23 N
5980921.20 N
5980986.18 N
5981051.16 N
5981116.14N
5981181.11 N
5981246.09 N
5981311.07 N
5981376.05 N
5981441.02 N
3554.~48 E
~~549.77 E
662542.84 E
663535.91 E
663528.97 E
663522.04 E
663515.11 E
663508.17 E
663501 .24 E
663499.52 E
663494.31 E
663487.37 E
663480.44 E
663478.46 E
663473.51 E
663466.57 E
663462.43 E
663459.64 E
663452.71 E
663445.77 E
663438.84 E
663431 .91 E
663424.97 E
663418.04 E
663411.11 E
663404.18 E
663397.24 E
663390.31 E
663383.38 E
663376.44 E
.' Dogleg
. Rate
("¡100ft)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Vertical
Section
3145.25
3189.37
3254.37
3319.36
3384.36
3449.35
3514.35
3579.35
3644.34
3660.44
3709.34
3774.33
3839.33
3857.93
3904.33
3969.32
4008.19
4034.32
4099.31
4164.31
4229.31
4294.30
4359.30
4424.30
4489.29
4554.29
4619.28
4684.28
4749.28
4814.27
Alaska Drilling & Wells
PBU_WOA E Pad
Comment
UG1
,,-..
WS2
WS1
CM3
...-.~
6 September, 2001 - 18:04
Page 5 of 12
DrillQuest 2.00.09.003
North Slope Alaska
Measured
Depth
(ft)
9300.00
9400.00
9500.00
9600.00
9683.82
9700.00
9800.00
9868.77
9900.00
10000.00
10007.48
10014.09
10027.30
10066.93
10086.75
10100.00
10139.59
10200.00
-10289.59
Incl.
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
40.803
Azim.
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
355.166
Sub-Sea
Depth
(ft)
7429.47
7505.16
7580.86
7656.55
7720.00
7732.25
7807.95
7860.00
7883.64
7959.34
7965.00
7970.00
Vertical
Depth
(ft)
7494.17
7569.86
7645.56
7721.25
7784.70
7796.95
7872.65
7924.70
7948.34
8024.04
8099.73
8129.70
8175.43
8243.24
Sperry-Sun Drilling Services
Proposal Report for E-102 Plan - E-102 Wp6
Your Ref: AS-Guessed
Local Coordinates
Northings Eastings
(ft) (ft)
4781.52 N
4846.63 N
4911.74N
4976.86 N
5031.43 N
5
5246.49 N
5255.09 N
5280.90 N
5293.80 N
5302.43 N
5328.21 N
5367.54 N
5425.88 N
973.84 W
979.34 W
984.85 W
990.36 W
994.97 W
9~.86 W
1.37W
.15W
6.87W
Ò12.38 W
1012.79 W
1013.16 W
1013.88 W
1016.07 W
1017.16 W
1017.89 W
1020.07 W
1023.39 W
1028.33 W
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Structure Reference. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 349.230° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 10289.500.,
The Bottom Hole Displacement is 5522.46ft., in the Direction of 349.268° (True).
Global CoordinaJe$ ',... ..
Northings EI$tìng~ .'. .
(ft):(tt}....' :...
5981
598157
.,.,.;
5981635.91
5981700.94
5981755.40 N
5981765.91 N
5981830.89 N
5981875.58 N
5981895.87 N
5981960.85 N
5981965.71 N
5981970.00 N
5981978.58 N
5982004.34 N
5982017.21 N
5982025.82 N
5982051.55 N
5982090.80 N
5982149.02 N
3369.$1 E
362.58 E
355.64 E
663348.71 E
663342.90 E
663341.78 E
663334.84 E
663330.08 E
663327.91 E
663320.98 E
663320.46 E
663320.00 E
663319.08 E
663316.34 E
663314.96 E
663314.04 E
663311.30 E
663307.11 E
663300.90 E
Dogleg
Rate
(O/100ft)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Vertical
Section
4879.27
4944.26
5009.26
5074.26
5128.73
5139.25
5204.25
5248.95
5269.24
5334.24
5339.10
5343.40
5351.98
5377.74
5390.62
5399.24
5424.97
5464.23
5522.46
Alaska Drilling & Wells
PBU_WOA E Pad
Comment
.~-..~
CM2
CM1ITHRZ
Base HRZlTop Kalubik
Kuparuk UB
Target - E-1 02 T1, 250.00 Radius.,
Current Target
Kuparuk UA
Original GOC
Kuparuk LB
BKUPITMLV
Total Depth:
10289.5OOMD,8243.24ftTVD
7 5/8" Casing
.--.
6 September, 2001 - 18:04
Page 6 of 12
DrillQuest 2.00.09.003
North Slope Alaska
Comments
Measured
Depth
(ft)
64.70
300.00
700.00
1005.00
1818.29
2048.56
2828.81
10289.59
Sperry-Sun Drilling Services
Proposal Report for E-102 Plan - E-102 Wp6
Your Ref: AS-Guessed
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Alaska Drilling & Wells
PBU_WOA E Pad
Comment
64.70
300.00
699.68
1002.27
1752.62
~-,
0.00 N
O.OON
1.22 N
9.00 N
130.54 N
0.00 E
0.00 E
13.90 W
50.11 W
323.22 W
Assume Vertical @ MSL
Begin Dir @ 1.000°/100
Increase in Dir Rate @ 2.0
Increase in Dir Rate @ 3.QPO
Er:td Dir, Start Sail @ 31.0fjoo :
: 300.000 MD, 300.000 TVD
'ft: 700.00ft MD, 699.68ft TVD
: 1005.000 MD, 1 002.27ft TVD
8.29ftM D, 1752.62ftTVD
1950.00
2595.76
8243.24
195.13 N
567.85 N
5425.88 N
Begin Dir @ 4.0000/100ft : 2048.56ft MD, 1950.000 TVD
End II, Start Sail @ 40.803° : 2828.81ftMD,2595.76ftTVD
epth : 10289.59ftMD,8243.24ftTVD
Formation Tops
Formati on Plane Penetration Poi n t
(Below Well Origin) .... Sub-Sea
Sub-Sea Dip Dip Depth Northings Eastings Formation Name
(ft) Deg. Deg. (ft) (ft) (ft)
483.00 0.000 1.257 ... 547.78 547.70 483.00 0.47 N 5.34W Base Gubik
1825.00 0.000 1.257 1978.21 1889.70 1825.00 175.40 N 392.30 W Base Permafrost
1875.00 0.000 1.257 2036.54 1939.70 1875.00 191 .76 N 417.49 W SV6
2755.00 0.000 1.257 3124.65 2819.70 2755.00 760.49 N 633.81 W Mid-Eocene Unconformity
2885.00 0.000 1.257 3296.39 2949.70 2885.00 872.32 N 643.27 W SV5
3125.00 0.000 1.257 3613.45 3189.70 3125.00 1078.77 N 660.73 W SV4
3615.00 0.000 1.257 4260.78 3679.70 3615.00 1500.27 N 696.37 W SV3
3795.00 0.000 1.257 4498.58 3859.70 3795.00 1655.11 N 709.46 W SV2
4170.00 0.000 1.257 4993.98 4234.70 4170.00 1977.69 N 736.74 W SV1
4680.00 0.000 1.257 5667.73 4744.70 4680.00 2416.40 N 773.84 W UG4A
4915.00 0.000 1.257 5978.19 4979.70 4915.00 2618.54 N 790.93 W UG3
5410.00 0.000 1.257 6632.12 5474.70 5410.00 3044.35 N 826.94 W UG1
6010.00 0.000 1.257 7424.77 6074.70 6010.00 3560.48 N 870.58 W WS2
6240.00 0.000 1.257 7728.62 6304.70 6240.00 3758.32 N 887.31 W WS1
641 5.00 0.000 1.257 7959.81 6479.70 6415.00 3908.86 N 900.04 W CM3
F~-
6 September, 2001 - 18:04
Page 7 of 12
DrillQuest 2.00.09.003
Sperry-Sun Drilling Services
Proposal Report for E-102 Plan - E-102 Wp6
Your Ref: AS-Guessed
Formati on Plane
(Below Well Origin)
Sub-Sea Dip Dip Dir.
(ft) Deg. Deg.
Profile
Measured Vertical
Depth Depth
(ft) (ft)
Penetration Point
Sub-Sea
Depth Northings Eastings
(ft) (ft) (ft)
Alaska Drilling & Wells
PBU_WOA E Pad
North Slope Alaska
Formation Tops (Continued)
~~o,
7720.00 0.000 1.257 9683.82 7784.70
7860.00 0.000 1.257 9868.77 7924.70
7965.00 0.000 1.257 10007.48 8029.70
7970.00 0.000 1.257 10014.09 8034.70
7980.00 0.000 1.257 10027.30 8044.70
8010.00 0.000 1.257 10066.93
8025.00 0.000 1.257 10086.75
8065.00 0.000 1.257 10139.59
Casing details
From
Measured Vertica
Depth Depth Depth Casing Detail
(ft) (ft)
<Surface> <Surface> 4392.89 3779.70 10 3/4" Casing
4447.03 3820.68 10289.59 8243.24 7 5/8" Casing
9~;ß7 W
,."~f~5 W
1012,£,9 W
1 01~:~ô W
1013.88 W
CM2
CM1ITHRZ
Base HRZlTop Kalubik
Kuparuk UB
Kuparuk UA
1016.07 W Original GOC
1017.16 W Kuparuk LB
1020.07 W BKUPITMLV
,~
6 September, 2001 - 18:04
Page 8 of 12
DrillQuest 2.00.09.003
<'
5pE!~~V-5UIl North Slope Alaska
DRILLING seRVIc:es AI k D .110 & W II
AHalilburtonCompony as a n Ing e s
~:'
PBU- WOA E Pad
E-102 WP6
Drill Quest"
bp
.~~ø'
... )11
.. ...
.. ...
~t~~
Current Well Properties
Well: E-102 WP6
Horizontal Coordinates:
Ref. Global Coordinates :
Ref. Structure Reference:
Ref. Geographical Coordinates :
RKB Elevation:
5976747.00 N, 664448.00 E
3542.24 N, 1987.21 E
70° 20' 33.9877" N, 148° 39' 55.0225" W
64.70ft above Mean Sea Level
64.70ft above Structure Reference
J.....~
..I1.a .
RDIU
If II.ISU ~ . WB1S
North Reference:
Units:
True North
Feet (US)
Proposal Data for E-1 02 Wp6
Vertical Or~in : Structure Reference
Horizontal rigin: Well
Measurement Units: ft
North Reference: True North
Dogleg severity: Degrees per 100 feet (US)
Vertical Section Azimuth: 349.230°
Vertical Section Description: Well
Vertical Section Origin: 0.00 N,O.OO E
Measured Incl. Azim. Vertical Northings Eastings Global Northings Global Eastings Vertical Dogleg
Depth Depth Section Rate
0.00 0.000 1.257 0.00 O.OON 0.00 E 5976747.00 N 664448.00 E 0.00
300.00 0.000 1.257 300.00 O.OON 0.00 E 5976747.00 N 664448.00 E 0.00 0.000
700.00 4.000 275.000 699.68 1.22 N 13.90 W 5976747.91 N 664434.07 E 3.79 1.000
1005.00 10.000 285.000 1002.27 9.00N 50.11 W 5976754.90 N 664397.70 E 18.21 2.000
1679.00 30.000 295.000 1632.55 96.27 N 261.55 W 5976837.51 N 664184.40 E 143.45 3.000
1818.29 31.000 303.000 1752.62 130.54 N 323.22 W 5976870.42 N 664121.99 E 188.64 3.000
2048.56 31.000 303.000 1950.00 195.13 N 422.68 W 5976932.81 N 664021.14 E 270.68 0.000
2828.81 40.803 355.166 2595.76 567.85 N 617.52 W 5977301.17 N 663818.17 E 673.24 4.000
10014.09 40.803 355.166 8034.70 5246.49 N 1013.16 W 5981970.00 N 663320.00 E 5343.40 0.000
10289.59 40.803 355.166 8243.24 5425.88 N 1028.33 W 5982149.02 N 663300.90 E 5522.46 0.000
Single Well Target Data for E-102 WP6
Measurement Units: ft
Coordinate
Target Point TVD Northings Eastings SSTVD Northings Eastings Target
Name Type Shape
E-I02 Tl Entry Point 8034.70 5246.49 N 1013.16 W 7970.00 5981970.00 N 663320.00 E Circle
E-1O2 Tl Driller's @ 95% Entry Point 8034.70 5246.22 N 1014.55 W 7970.00 5981969.70 N 663318.61 E Polygon
Boundary Point A 8034.70 5426.42 N 1002.10 W 7970.00 5982150.13 N 663327.11 E
B 8034.70 5412.02 N 967.54 W 7970.00 5982136.49 N 663361.97 E
C 8034.70 5387.75 N 940.75 W 7970.00 5982112.82 N 663389.29 E
D 8034.70 5361.73 N 921.21 W 7970.00 5982087.23 N 663409.40 E
E 8034.70 5336.26 N 907.07 W 7970.00 5982062.08 N 663424.09 E
F 8034.70 5311.50 N 897.16 W 7970.00 5982037.54 N 663434.54 E
G 8034.70 5287.31 N 890.46 W 7970.00 5982013.50 N 663441.77 E
H 8034.70 5263.22 N 886.34 W 7970.00 5981989.51 N 663446.42 E
I 8034.70 5238.68 N 884.95 W 7970.00 5981965.01 N 663448.35 E
J 8034.70 5213.17 N 886.13 W 7970.00 5981939.48 N 663447.73 E
K 8034.70 5186.16 N 890.46 W 7970.00 5981912.38 N 663443.99 E
L 8034.70 5157.39N 898.94 W 7970.00 5981883.43 N 663436.14 E
M 8034.70 5126.85 N 912.77W 7970.00 5981852.59 N 663422.99 E
N 8034.70 5096.32 N 934.01 W 7970.00 5981821.60 N 663402.42 E
0 8034.70 5072.50 N 964.67 W 7970.00 5981797.12 N 663372.29 E
P 8034.70 5067.19 N 1002.19 W 7970.00 5981790.99 N 663334.90 E
Q 8034.70 5082.16 N 1037.72 W 7970.00 5981805.17 N 663299.05 E
R 8034.70 5107.94 N 1065.36 W 7970.00 5981830.34 N 663270.85 E
S 8034.70 5135.61 N 1085.49 W 7970.00 5981857.56 N 663250.12 E
T 8034.70 5162.78 N 1099.73 W 7970.00 5981884.41 N 663235.28 E
U 8034.70 5188.93N 1109.44 W 7970.00 5981910.34 N 663225.00 E
V 8034.70 5214.17 N 1115.57 W 7970.00 5981935.44 N 663218.32 E
W 8034.70 5238.84 N 1118.70 W 7970.00 5981960.04 N 663214.65 E
X 8034.70 5263.39 N 1119.33W 7970.00 5981984.57 N 663213.48 E
Y 8034.70 5288.36 N 1117.21W 7970.00 5982009.58 N 663215.05 E
Z 8034.70 5314.27 N 1112.11 W 7970.00 5982035.60 N 663219.58 E
[ 8034.70 5341.58 N 1103.30 W 7970.00 5982063.09 N 663227.79 E
\ 8034.70 5370.23 N 1089.41 W 7970.00 5982092.04 N 663241.05 E
] 8034.70 5399.05 N 1068.65 W 7970.00 5982121.31 N 663261.17 E
^ 8034.70 5421.38 N 1038.70 W 7970.00 5982144.29 N 663290.63 E
8034.70 5426.42 N 1002.10 W 7970.00 5982150.13 N 663327.11 E
Fault lA Entry Point 5399.40 2667.92 N 468.59 W 5334.70 5979404.00 N 663921.00 E Point
Fault I B Entry Point 5539.40 3286.89 N 597.04 W 5474.70 5980020.00 N 663779.00 E Point
DriliQuest 2.00.09.003
I(
~'
Sperry-Sun
Anticollision Report
Company: BP Amoco
Field: Prudhoe Bay
Reference Site: PB E Pad
Reference Well: E-102
Reference Wellpath: Plan E-102
Date:
09/06/2001
Time: 16:36:25
Page:
1
Co-ordinate(NE) Reference:
Vertical (TVD) Reference:
Well: E-102, True North
64.7' 64.7
Db: Oracle
GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference - There are 1RðIIIœ1llOdis in this f1ètil1cipal Plan & PLANNED PROGRAM
Interpolation Method: MD Interval: 100.00 ft Error Model: ISCWSA Ellipse
Depth Range: 64.70 to 10289.59 ft Scan Method: Trav Cylinder North
Maximum Radius: 1222.49 ft Error Surface: Ellipse + Casing
Survey Program for Definitive Well path
Date: 05/06/2001 Validated: No
Planned From To Survey
ft ft
64.70 1200.00
1200.00 10289.59
Version:
TooIcode
11
Tool Name
Planned: E-102 wp06 V1
Planned: E-102 wp06 V1
CB-GYRO-SS
MWD
Camera based gyro single shots - Used in Preference
MWD - Standard - Used in Preference
Casing Points
MD TVD Diameter Hole Size
ft ft in in
4392.89 3779.77 10.750 12.250
10289.59 8243.54 7.620 8.500
Summary
Name
10 3/4"
75/8
<------------------ Offset Well path ---------------------> Reference Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD MD Distance Area Deviation Warning
ft ft ft ft ft
E-102,Plan E-102,E-102 10289.59 10289.59 0.02 535.65 -167.07 FAIL: Major Risk
PB E Pad E-07 E-07 V3 1304.98 1300.00 274.31 25.73 248.75 Pass: Major Risk
PB E Pad E-07 E-07A V2 1304.98 1300.00 274.31 25.73 248.75 Pass: Major Risk
PB E Pad E-07 E-07APB1 V1 1304.98 1300.00 274.31 25.73 248.75 Pass: Major Risk
PB E Pad E-07 E-07 APB2 V1 1304.98 1300.00 274.31 25.73 248.75 Pass: Major Risk
PB E Pad E-08 E-08 V1 1101.58 1100.00 173.38 20.97 152.44 Pass: Major Risk
PB E Pad E-09A E-09A V1 799.42 800.00 67.34 17.31 50.03 Pass: Major Risk
PB E Pad E-09APB1 E-09APB1 V1 799.42 800.00 67.34 17.31 50.03 Pass: Major Risk
PB E Pad E-09 E-09 V1 799.42 800.00 67.34 17.31 50.03 Pass: Major Risk
PB E Pad E-100 E-100 V3 1001.72 1000.00 31.28 19.44 11.85 Pass: Major Risk
PB E Pad E-104 Plan E-104 V3 Plan: E- 1785.33 1800.00 106.42 47.01 59.45 Pass: Major Risk
PB E Pad E-10A E-10A V3 599.63 600.00 41.45 13.44 28.01 Pass: Major Risk
PB E Pad E-10 E-10V1 599.63 600.00 41.45 13.44 28.01 Pass: Major Risk
PB E Pad E-110 E-110 V3 Plan: Definit 698.79 700.00 75.30 13.09 62.22 Pass: Major Risk
PB E Pad E-111 E-111 V2 Plan: Definit 698.67 700.00 111.82 13.15 98.67 Pass: Major Risk
PB E Pad E-11A E-11A V3 499.47 500.00 149.66 12.66 137.00 Pass: Major Risk
PB E Pad E-11APB1 E-11APB1 V3 499.47 500.00 149.66 12.66 137.00 Pass: Major Risk
PB E Pad E-11 E-11 V3 499.47 500.00 149.66 12.77 136.89 Pass: Major Risk
PB E Pad E-11 Plan E-11 B V6 Plan: E- 499.47 500.00 149.66 12.57 137.09 Pass: Major Risk
PB E Pad E-12 E-12 V1 399.57 400.00 259.37 10.24 249.13 Pass: Major Risk
PB E Pad E-34 E-34 V1 800.95 800.00 147.49 13.02 134.54 Pass: Major Risk
PB E Pad E-38 E-38 V1 1839.75 1800.00 347.71 40.52 308.25 Pass: Major Risk
PB E Pad E-38PB1 E-38PB1 V1 1839.75 1800.00 347.71 40.52 308.25 Pass: Major Risk
PB E Pad E-38PB2 E-38PB2 V1 1839.75 1800.00 347.71 40.52 308.25 Pass: Major Risk
NaJre
13-102 3544.16
243
233
200
167
133
100
33
0
33
100
133
167
200
-233
243
W ElL DET AIl.S
ANTI-COLLISION SEffiNGS
+NI-S
+F/.W
Latitude
Interpolation MethodMD
Depth Range From: 64.70
Maximum Range: 1222.49
Interval: (XtOO
To: 10289.59
Reference: Plan: E-1O2 wpO6
Longitude
Sbt
NlA
Easmg
664448.00
Northing
5976747.00
70'2O'33.988N 148-39'55.023W
1986.43
0
From Colour ToMD
0 - 250
250 - 500
500 750
750 - 1000
1000 1250
1250 - 1500
1500 1750
1750 - 2000
2000 - 2500 .-33
2500 3000
3000 - 3500
3500 - 4000
4000 4500 1-25
4500 - 5000
'ii000 5500
"5::DO - 6000 1-17
.J - ",,6500
~;>'roo ~ilOO
~~OOO
. - 8500
9000
9500
lrnm rŒ7
10500
8
17
25
'33
,7
/
/
/
I
/
/
/
í
I
/
i
í
I
I
i
í
I
!
I
270 -+
t;" \
- .
,7
0
~
-:a
þ
::I
t;"
i
i
i
1
i
I
0
~
240
i
/ f E-IO (E-IO)
20 E-IOA (E-IOA)
E-11O (E-llO)
COMPANY DETAILS
SURVEY PROGRAM
Depth I'm Depth To Su,,'e¡'¡Pbo
M.70 1200.00 Pbonal: 13-102 "J>06 VI
1200.00 10289.59 Pbnned:I~IO2"J>06VI
CnOYRO.SS
MWIJ
WIUj'Anll~':TAII$
I'bo I> 102
Rig:
Ref. I}.,um:
64.T
M.7OfI
DP Almeo
Tnol
V.See"'n
Anglo
~9.27'
~;;r.~
SIasI..g
Fn,m 1\'0
Cakulatim Method: Milmum Cun~1Ure
Error Splem: ISCWSA
S""" Method: Tray Cymder North
Error Surface: Eüpt>:al+ Casing
Warning Method: RuJos Based
0
Colour To MD
250
500
750
I (}{)(J
1250
1500
1750
2000
2500
3000
3500
4000
4500
5000
5500
6{){)(J
0 6500
7000
7500
!l000
!I 5 (}{)
9OO)
9500
I (}{)(}{)
mliOO
Oripn
,,;!.W
0.(1)
0.00
0.00
-.
I H òl'.N I)
17). Majo, R.k
I7A). ~t.j", ¡¡.k
I7AI'DI). Ma", ¡¡"k
I7AI'D2). ~t.", ¡¡.k
III). ~t.j"r ¡¡.k
'.-, ..()I)AJ.M.",¡¡.k
,., I IE.OOAI'DI). Ma,'r ¡¡.k
" 'I). ~t.jo, R.k
. 1(11). ~"'j>, ¡¡ok
.:. . :,;,J~~.(~U:~~~t.k
0). M,,'r Rok
110). Maj" R.k
111). ~"'j'r R.k
, .IIA). Ma"r¡¡.k
I (E. I IAI'DI). ~t.j'r ¡¡ok
I). ~t.j'r R.k
.n E.IID). Ma,>, R.k
2). Maj." R.k
\4). Maj" R.k
\). Maj."Ri<k
(I~381'01). Major ¡¡.k
.,. (E-381'02). Ma"r ¡¡i<k
. , '2
- .-Ir\
I'ian: 1;'102 "l'()(> (I;' 11I2II'1an E.1O2)
l>..tl<: CJI.Q\I2001
1>.11<:__-
('r",'OO Oy:o",(òorr
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [25ff¿Wkoo:____--
~ (3
"/
""'-E-IIA(E-IIA)
50 E-IIAPBI (E-I IAPBI)
E-I I (E-I I)
E-I I (Plan E-I IB)
18
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [100ft/in]
SEl'llON IJErAII.~
¡¡ev.:,,"¡: -------
IJal<:__-
See MIJ ("" A7j 1\'1> ,Nt.s .".W I~"'g n:a« vs", Targd
I 64.70 0.00 0.00 64.70 0.!X) 000 O.!XX) om IUXI
2 JOO.OO 0.00 0.00 JOO. 00 O.!XI O.IX! O,(XX) O.IXI O,(XI
3 700.00 4.00 27.1.00 h'J9.68 1.22 .13.1}() 0.98-1 275.1X1 3.78
4 1005.00 10.00 2J!5.!XI 1002.27 9.00 -'>0.11 1.- 16.48 18.18
5 1679.00 30.00 29.1.1X! 1632.56 96.27 .261.55 2.953 14.55 143.28
6 1818.29 31.00 303.00 1752,62 130.54 .323.22 2.953 79.63 188.43
7 20-18.56 31.00 303.00 19.10.00 195.13 .422.f-N O.IJO( 0.00 270.41
8 2828.81 40.80 3.15.17 259.1.78 567.84 .617.'>0 3.9.17 95. I.! 6n.8f>
9 10014.09 40.80 355.17 8035.00 524(>.17 .1012.82 O,(XX) 0.00 5343.01
10 10289.59 40.80 355.17 8243.55 5425.55 .1027.\18 O.(XJO O.IX! 5522.08
TREE: 5-1/8" - 5M Carbon L-80
WELLHEAD: 135/8" - 5M FMC SH
103/4",45.5 lIft, L-80, BTC
I 4393' I
Plug Back Depth 110,200' I
7 5/8", 29.7 lIft, L-80,
BTC-Mod
Drift = 6.750"
110,290. I
t
\.
~
E-102i Proposed Completion
,
Cellar Elevation = 30.2'
Doyon 14 RKBE = 64.7'
5-1/2" tubing hanger
5-1/2" 17# L-80
Connection: Seal-Lock HC (Coupling 0.0. = 6.050")
I 2200' I 5-1/2" 'X' Landing Nipple with 4.562" seal bore and 10' handling pups
I 4700' I
Crossover to 4-1/2" L-80 tubing (to house 4 1/2" X 1" GLM).
4-1/2" X 1" KBG-2 GLM.
Crossover to 5-1/2" tubing.
5-1/2" 17# L-80,
( Seal-Lock HC Connection)
One full joint of 4-1/2" tubing above landing nipple with crossover to 5-1/2".
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
75/8" x 4-1/2" Baker 'S-3' Production Packer
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID..
4-1/2" WireLine Entry Guide set at +/-9868' (-150' above the Kuparuk Formation).
Short joint with RIA tag above Top Kuparuk @ - 10,000' md.
Date Rev By Comments
06/28/01 WSI Proposed Completion
08/28/01 DEW Revised for Wp #5, edit hole, casing size
09/07/01 DEW Revised for Wp #6 edit depths; Add GLM
MIDNIGHT SUN
WELL: E-102i
API NO: 50-029-1111?
BP Alaska Drilling & Wells
,"
. E-102i Kick Tolerance KUPB (
Page 1 of 2
(
9/7/2001 4:19 PM
bp
KICK TOLERANCE CALCULATOR
For Vertical, Deviated or Horizontal Wells
E-102i
Version 6.0, December 2000
us
Well: I
Kick Zone Parameters:
Open hole Size?
Measured Depth?
Vertical Depth?
Horizontal Length (>87 deg) ?
Tangent Angle Above Horizontal?
Min Pore Pressure Gradient?
Max Pore Pressure Gradient?
Kick Zone Temperature?
Weak Point Parameters:
9 Measured Depth?
10 Vertical Depth?
11 Section Angle «87 deg) ?
12 Min Fracture Gradient/ EMW?
13 Max Fracture Gradient / EMW
14 Weak Point Temperature?
Other Parameters:
15 Drill Collar OD ?
16 Drill Collar Length?
17 Drillpipe 00 ?
18 Surface Pressure Safety Factor?
19 Mud Weight in Hole?
1
2
3
4
5
6
7
8
Annular Capacity Around BHA:
Annular Capacity Around DP:
At Min Fracture Gradient:
Circulating MAASP
Gas Gradient at Weak Point
For Min Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
For Max Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
At Max Fracture Gradient:
Circulating MAASP
Gas Gradient at Weak Point
For Min Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
For Max Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
(inch)
(ft)
(ft)
(ft)
(deg)
(ppg)
(ppg)
(deg.F)
(ft)
(ft)
(deg)
(ppg)
(ppg)
(deg.F)
(inch)
(ft)
(inch)
(psi)
(ppg)
(bbl/ft)
(bbl/ft)
Units (UK/US): I
Input Error Messages:
9.875
10015
8035
0
0
7.600
8.200
158
Non-Horizontal
4395
3780
41
12.500
13.000
100
6.75
200
5
100
10.300
0.05046
0.07044
Comments:
(psi) 332
(psi/ft) 0.0551
(ft) 3039
(bbl) 210.1
(ft) 2518
(bbl) 173.3
(psi) 430
(psi/ft) 0.0573
(ft) 3259
(bbl) 225.5
(ft) 2734
(bbl) 188.6
E-102i Kick Tolerance KUPB (
Page 2 of 2
ì
(
9/7/2001 4:19 PM
I~Min Fracture Grad -<>-Max Fracture Grad I
I
~
~
---{)
~
I
I I
,
I I I
I
I I I
I : , I I
, I I I
I I '
I I I
!
I I
I
250
200
-
..c
..c
-
CÞ 150
u
c
as
...
CÞ
{!. 1 00
~
u
~
50
0
7.50
7.60
7.70
7.80
7.90
Pore Pressure Gradient
APPENDIX:
8.00
8.10
8.20
8.30
Maximum Allowable Gas Influx Volume
Based on Casing Burst & Surface Equipment Rating
Max Allowable Surface Pressure? (psi)
Near Surface Casing 10 ? (inch)
Near Surface Annular Temperature? (deg.F)
Gas Gradient at Max Surface Pres: (psi/ft)
Near Surface Annular Capacity: (bbl/ft)
At Minimum Pore Pressure Gradient:
Max Allowable Gas Height at Surface: (ft)
Max Allowable Gas Vol. on Shut-in: (bbl)
At Maximum Pore Pressure Gradient:
Max Allowable Gas Height at Surface: (ft)
Max Allowable Gas Vol. on Shut-in: (bbl)
1300
-
:c
B 1280
CÞ
§ 1260
~ 1240
In
~ 1220
CÞ
.g 1200
::
.2 11 80
<C
>< 1160
as
:E 1140
7.50
4500
9.56
80
0.095
0.06449
<= Open hole Size
Comments:
12556 Extends to hole TO
infinite
11988 Extends to hole TO
infinite
7.60
7.70
7.80
7.90
Pore Pressure Gradient
8.00
8.10
8.20
8.30
II'
E-102i Kick Tolerance KU PB #4,
Page 1 of 2
I(
9fi/2001 4:20 PM
bp
KICK TOLERANCE CALCULATOR
For Vertical, Deviated or Horizontal Wells
E-102;
Version 6.0, December 2000
us
Well: I
Kick Zone Parameters:
Openhole Size?
Measured Depth?
Vertical Depth?
Horizontal Length (>87 deg) ?
Tangent Angle Above Horizontal?
Min Pore Pressure Gradient?
Max Pore Pressure Gradient?
Kick Zone Temperature?
Weak Point Parameters:
9 Measured Depth?
10 Vertical Depth?
11 Section Angle «87 deg) ?
12 Min Fracture Gradient / EMW ?
13 Max Fracture Gradient / EMW
14 Weak Point Temperature?
Other Parameters:
15 Drill Collar 00 ?
16 Drill Collar Length?
17 Drillpipe 00 ?
18 Surface Pressure Safety Factor?
19 Mud Weight in Hole?
1
2
3
4
5
6
7
8
Annular Capacity Around BHA:
Annular Capacity Around DP:
At Min Fracture Gradient:
Circulating MAASP
Gas Gradient at Weak Point
For Min Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
For Max Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
At Max Fracture Gradient:
Circulating MAASP
Gas Gradient at Weak Point
For Min Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
For Max Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
(inch)
(H)
(H)
(H)
(deg)
(ppg)
(ppg)
(deg.F)
(ft)
(H)
(deg)
(ppg)
(ppg)
(deg.F)
(inch)
(ft)
(inch)
(psi)
(ppg)
(bbl/ft)
(bbl/ft)
Units (UK/US): I
Input Error Messages:
9.875
10015
8035
0
0
7.600
8.200
158
Non-Horizontal
4395
3780
41
13.500
13.700
100
6.75
200
5
100
1 0.300
0.05046
0.07044
Comments:
(psi) 528
(psi/H) 0.0594
(ft) 3479
(bbl) 241.1
(ft) 2953
(bbl) 204.0
(psi) 567
(psi/H) 0.0602
(H) 3568
(bbl) 247.3
(ft) 3041
(bbl) 210.2
. E-102i Kick Tolerance KUPB #4
Page 2 of 2
(
9/7/2001 4:20 PM
!-ô-Min Fracture Grad -o-Max Fracture Grad I
-
...
I
I
I
I i I
I
, I i
I ! I : ,
I
I
I :
!
i
300
250
-
.c
B 200
Q)
(.)
c
~ 150
~
0
~
.¥: 100
(.)
~
50
0
7.50
7.70
7.80
7.90
Pore Pressure Gradient
8.00
8.10
8.30
7.60
APPENDIX:
8.20
Maximum Allowable Gas Influx Volume
Based on Casing Burst & Surface Equipment Rating
Max Allowable Surface Pressure? (psi)
Near Surface Casing 10 ? (inch)
Near Surface Annular Temperature? (deg.F)
Gas Gradient at Max Surface Pres: (psi/H)
Near Surface Annular Capacity: (bbl/H)
At Minimum Pore Pressure Gradient:
Max Allowable Gas Height at Surface: (H)
Max Allowable Gas Vol. on Shut-in: (bbl)
At Maximum Pore Pressure Gradient:
Max Allowable Gas Height at Surface: (ft)
Max Allowable Gas Vol. on Shut-in: (bbl)
1300
-
:c
B 1280
Q)
5 1260
~ 1240
tJ
~ 1220
Q)
.g 1200
3:
.2 1180
~
>< 1160
as
:E 1140
7.50
4500
9.56
80
0.095
0.06449
<= Openhole Size
Comments:
12556 Extends to hole TO
infinite
11988 Extends to hole TO
infinite
7.70
7.80
7.90
Pore Pressure Gradient
7.60
8.00
8.10
8.20
8.30
..
(
(,
POST THIS NOTICE IN THE DOGHOUSE
E-102i Rig site
Summary of Drilling Hazards
./ Standard Operating Procedures for H2S precautions should be followed at all
times. The highest level of H2S recently measured on E-pad, in the last 12 months, was
on E-02A, E-05A, E-08, and E-28A @ 10 ppm, (September 2000).
./ Well E-100 is located -37' North and E-10A is located 37' South of planned well center.
./ E-100 and E-10A both present close approach issues in the surface hole. All wells pass
major risk criteria. Nearby well E-100 will be as close as 31.28' center-center @ 1001'
MD. E-10A is as close as 41.45' center-center @ 599' MD.
./ Be prepared for possible coal seams at the top of the UGNU.
./ Continue best practices for well control during drilling the UGNU. Monitor for signs of a
kick.
./ The pressure in the Kuparuk is expected to be in the range of 3200 psi to 3400 psi.
Initially, it was -4100psi. The HRZ will require a mud weight of about 10.3 ppg. The
Kuparuk will be equivalent to -8.2 ppg. Be prepared for possible lost circulation and
differential sticking.
./ Lost circulation may also be experienced while running 7" casing. The SSD lost
circulation tree should be followed if lost fluid returns are encountered.
CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL
INFORMATION.
E-I02i
194715
~
~,
DATE
07/31/01
CHECK NO.
00194715
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
ALASKAOILA
NET
00
72701 CKO72701 F
)YMT OMMENTS:
-fANDL NG I N5T :
100.00
100.00
H
Per it To Drill ee
5tH - Terrie Hub Ie
X4628
- \O/î
é:"~" .' ~
TOTAL ~
~TTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
100.00
100.00
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AtoI AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H
194715
CONSOLIDATED COMMERCIAL ACCOUNT
56.389
412
00194715
)AY
, '" ",'
"',,, ,,' ":' ,:,', '",,:,:,'
d~SHUNDRED ~ OO/100~**it************.J(o***~*if**4f*********** US DOLLAR
"','
",'..' .
",'DATE,
Øi/3f/Ol
11
AMOUNT
~100.. (}oj
fa The
ORDER
Of
ALASKA OIL AND 'GAS
,GpNSERVßT I q~COMMI SSION
33$WES~ 7t:~AVENUE
SUITE 100 "",
ANCHORAØE
NOTVALlOAFjER 126 DAYS
AK 99501
, ' '
\(~ ~¡JiÂL{ --
" ," ""","".,..",...",..,v., "0"
,
III . g ~ 7 . 5 III I: 0 ~ . 2 0 ~ 8 g 5 I: 0 0 8 ~ ~ . g III
~
t
"
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETIER/P ARAGRAPHS TO
BE INCLUDED IN TRANSl\1ITT AL LETTER
WELL NAME
CHECK 1
STANDARD LETTER
DEVELOPMENT
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LA TERAL
(If api number last two (2)
digits are between 60-69)
~
DEVELOPMENT
RED RILL
PILOT HOLE (PH)
EXPLORATION
/
ANNULAR D)SPOSAL
( (/) NO
-
r~
INJECTl7L
,-~ ~ "'-\<tc...\o\
INJECTION WELL
RED RILL
ANNULAR DISPOSAL
THIS WELL
ANNULAR DISPOSAL
<--> YES
DISPOSAL INTO OTHER
ANNULUS
<--> YES +
SPACING EXCEPTION
Templates are located m drive\jody\templates
(:8 ( t.
E - /QZ,'
"CLUE"
The permit is for a new wellbore segment of existing well
. Permit No, API No. .
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(f), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
I
Please note that an disposal of fluids generated. . .
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved. subject to
full compliance with 20 AAC 25.055. Approval to peñorate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Companv Name) will assume the liability of any protest to
the spacing exception that may occur.
~
~
~#
~
a,'
WELL PERMIT CHECKLIST COMPANY WELL NAME r: - / D1- PROGRAM: exp - dev - redrll
FIELD & POOL . /çß INIT CLASS ~¡/,~(!:. I ~J¡/VJ GEOL AREA
ADMINISTRATION 1.Permitfeeattached....................... 'N " ,
2. Lease number appropriate.~ 5:~ . c;.J.J., ~.~ l' (~D/. . J N * S"-r~.:::- /oe-q-+,V't-.. i.1.- A-Þ L o2-B3o(:¡' /' ~~ r6~uc--Ir'v<- ~k'-L/4..1 ~d
3. Unique well name and number. .. . . . . . . . . . . . . . . . N -r: 2:>. 1-"- /ÎÞL o'Z..ß¿~,
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . N
5. Well located proper distance from drilling unit boundary. . . . N
6. Well located proper distance from other wells.. . . . . . . . . N
7. Sufficient acreage available" in drilling unit.. . . . . . . . . . . N.
8. If deviated, is well bore plat included.. . . . . . . . . . . . . . , N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . ) N
11. Permit can be issued without conservation order. , . . . . . . N
AP R DATE 12. Permit can.be issued without administrative approval.. . . . . ~.N
t - '1. (7 -01 13. Can permit be approved before 15-day wait.. . . . . . . . . . Ct..JN
14. Conductor string provided. . . . . . . . . . . . . . . . . . . % N
15. Surface casing protects all known USDWs. . . . . . . . . . . N
16. CMT vol adequate to circulate on conductor & surf csg. . . . . '..N.. .
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ~Qi)
18. CMT will cover all known productive horizons. . . . . '. . . . . 'N
19. Casing designs adequate for C, T, 8 & permafrost. . . . . . . ' N \. I \
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . ' N tj.'~..,.\ "-t ,\ \. ~ ~~~~~ ~\~
21. If a re-drill, has a 10-403 for abandonment been approved. . . ~ ~ ~ ~ \ ' ('. '- C\..
22. Adequate wellbore separation proposed.. . . . . . . . . . . . N <:...~~ C).~\>~"-\~)~~\~\t>t-) ,~t"'6 ~~~\\'..~ù.
23. If diverter required, does it meet regulations. . . . . . . . . . N
24. Driiling .fluid program schematic & equip list adequate. . . . . N
~/A !;~ . ~~: ~g~~sp:.:~~::~~~:~:~tn ¡';si t¿ . . . . LbiiJ" . psig: ~ ~~ \) ~ ~ Q ~ ~ ~ '
-~ 27. Choke manifold complies wlAPI RP-53 (May 84). . . . . . . . N
28. Work will occur without operation shutdbwn. . . . . . . . . . . N
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y @?~ \....~~ ~
30. Permit can be issued wlo hydrogen sulfide measures. . . . .. ~,N /'
31. Data presented on potential overpressure zones. . . . . . . " . (i;!, ~
32. Seismic analysis of shallow gas zones. . . . . . . . . . . " f'¥' "f N
:~ DATE 33. Seabed condition survey (if off-shore). . . . . . . . . ~ _'~L Y N
. 7./ ).0 I 34. Contact name/phone for weekly progress reports [explopnory only] Y N
ANNULAR DISPOSAL35. With proper cementing records, this plan.
(A) will contain waste in a suitable receiving zone; . . . . . . .
(8) will not contaminate frèshwater; or cause drilling waste. ..
to surface; .
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING:' UIC/Annular COMMISSION:
~ ~ W <'\ W~Mû---""""', 9~~/W¡úl
ENGINEERING
GEOLOGY
APPR
DATE
seN
V wellbore sag _ann. disposal para req -
~ ON/OFF SHORE / Þ¡
UNIT#
10
.
0
Z
0
~
:E
:::0
(
-
~'
m
(~
~O ~~ \ ~~ \r-..~ ~~ ~ ~ ,~~ ~
z
~
J:
-
~'"s \ ~
-
en
>
:0
m
:Þ
(
Y N
Y N
0..,,"-'-.) \~ "
Com ments/l nstructions:
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)
\1
{
Well H ¡story File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file. .
To improve the readability of the Well History tHe and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special 'effort has been made to chronologically ','
organize this category of information.
(
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Thu Jun 06 09:09:18 2002
Reel Header
Service name........ .... .LISTPE
Date.....................02/06/06
Origin...................STS
Reel Name.............. ..UNKNOWN
Continuation Number.... ..01
Previous Reel Name..... ..UNKNOWN
Comments.................STS LIS
Tape Header
Service name............ .LISTPE
Date.....................02/06/06
Origin...................STS
Tape Name.............. ..UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments.................STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MM-11169
J. MARTIN
A. MADSEN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
AK-MM-11169
B. HENNINGSE
L. VAUGHN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
f
i~
Writing Library.
Scientific Technical Services
Writing Library.
Scientific Technical Services
E-102
500292304200
BP Exploration (Alaska), Inc.
Sperry-Sun Drilling Services
06-JUN-02
MWD RUN 2
AK-MM-11169
J. MARTIN
A. MADSEN
MWD RUN 3
AK-MM-11169
B. HENNINGSE
A. MADSEN
6
11
14
4963
501
64.11
29.80
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
13.500 20.000 80.0
9.875 10.750 4407.0
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
CAOJ-/'ðéo
100;43
(
~,
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1 & 2 WERE DIRECTIONAL AND NATURAL GAMMA
PROBE (NGP,
UTILIZING SCINTILLATION DETECTORS).
4. MWD RUN 3 COMPRISED
(DGR,UTILIZING
GEIGER-MUELLER TUBE
WAVE RESISTIVITY
PHASE 4 (EWR4).
DIRECTIONAL, DUAL GAMMA RAY
DETECTORS), AND ELECTROMAGNETIC
5. MWD RUN 4 COMPRISED DIRECTIONAL, DGR, EWR4,
COMPENSATED NEUTRON
POROSITY (CNP), AND STABILIZED LITHO-DENSITY (SLD).
6. MWD DATA ARE CONSIDERED PDC PER E-MAIL FROM DEWAYNE
SCHNORR/BOB
DAWSON (BP) TO RAY OAKLEY (SSDS), DATED 11/19/01.
7. MWD RUNS 1 - 4 REPRESENT WELL E-102 WITH API#
50-029-23042-00.
THIS WELL REACHED A TOTAL DEPTH OF 10315'MD/8321'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SGRD = SMOOTHED NATURAL GAMMA RAY.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(EXTRA-SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME - DEEP
RESISTIVITY.
SPSF = SMOOTHED NEUTRON POROSITY (SANDSTONE MATRIX,
FIXED HOLE SIZE).
SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE.
SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT
BIN) .
SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN).
SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC
ABSORPTION FACTOR (LOW-
COUNT BIN) .
SLDSLIDE = NON-ROTATED INTERVALS ACCOUNTING FOR
BIT-TO-SENSOR DISTANCE.
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: 9.875"
MUD WEIGHT: 9.3 - 10.3 PPG
MUD SALINITY: 600 - 800 PPM CHLORIDES
FORMATION WATER SALINITY: 18621 PPM CHLORIDES
FLUID DENSITY: 1.0 G/CM3
MATRIX DENSITY: 2.65 G/CM3
LITHOLOGY: SANDSTONE
$
File Header
Service name........... ..STSLIB.001
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation..... ..02/06/06
Maximum Physical Record..65535
File Type................LO
Previous File Name. .... ..STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
1
{
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
RPX
RPS
RPM
RPD
FET
NPHI
NCNT
FCNT
RHOB
DRHO
PEF
$
(
clipped curves; all bit runs merged.
.5000
START DEPTH
71.0
114.5
4390.5
4390.5
4390.5
4390.5
4390.5
6552.0
6552.0
6552.0
6561.0
6561.0
6561.0
STOP DEPTH
10243.0
10315.0
10235.0
10235.0
10235.0
10235.0
10235.0
10199.0
10199.0
10199.0
10208.0
10208.0
10208.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 71.0 2803.0
MWD 2 2803.0 4422.0
MWD 3 4422.0 6666.5
MWD 4 6666.5 10315.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type............. .....0
Data Specification Block Type.....O
Logging Direction...... ...... .... . Down
Optical log depth units...... .... .Feet
Data Reference Point... .......... . Undefined
Frame Spacing... ............. ... ..60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CNTS 4 1 68 36 10
NCNT MWD CNTS 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD BARN 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 71 10315 5193 20489 71 10315
ROP MWD FT/H 0.51 1112.83 156.286 20402 114.5 10315
GR MWD API 10.52 304.77 75.9674 20345 71 10243
RPX MWD OHMM 0.37 121. 73 4.0669 11690 4390.5 10235
RPS MWD OHMM 0.4 899.09 4.57787 11690 4390.5 10235
RPM MWD OHMM 0.39 1952 5.69284 11690 4390.5 10235
(
(
RPD MWD OHMM 0.52 2000 10.1681 11690 4390.5 10235
FET MWD HOUR 0.19 71. 56 1.71696 11690 4390.5 10235
NPHI MWD PU-S 18.63 65.89 35.4407 7295 6552 10199
FCNT MWD CNTS 443.12 795 567.79 7295 6552 10199
NCNT MWD CNTS 2203.87 3136 2616.06 7295 6552 10199
RHOB MWD G/CM 1.881 3.049 2.38378 7295 6561 10208
DRHO MWD G/CM -0.224 0.733 0.0419713 7295 6561 10208
PEF MWD BARN 1. 31 8.14 2.41661 7295 6561 10208
First Reading For Entire File.. ....... .71
Last Reading For Entire File... ....... .10315
File Trailer
Service name... """" ..STSLIB.001
Service Sub Level Name...
Version Number. ...... ... .1.0.0
Date of Generation.. .... .02/06/06
Maximum Physical Record. .65535
File Type........... .... .LO
Next File Name......... ..STSLIB.002
Physical EOF
File Header
Service name........ ... ..STSLIB.002
Service Sub Level Name...
Version Number.. ......, ..1.0.0
Date of Generation.... ...02/06/06
Maximum Physical Record..65535
File Type................LO
Previous File Name.... ...STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
71.0
114.5
STOP DEPTH
2760.0
2803.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
19-0CT-01
Insite
66.16
Memory
2803.0
71.0
2803.0
.0
42.4
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
PB02161HWRGF6
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13.500
80.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
Spud Mud
9.20
('
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... ........... ...0
Data Specification Block Type. ....0
Logging Direction. ............ ....Down
Optical log depth units... ....... .Feet
Data Reference Point... ... ....... .Undefined
Frame Spacing....... ...... ....,.. .60 .1IN
Max frames per record.... ...... ...Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
275.0
8.5
400
8.1
.000
.000
.000
.000
Name Service Order
DEPT
ROP MWD010
GR MWD010
units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
Name Service Unit
DEPT FT
ROP MWD010 FT/H
GR MWD010 API
Min
71
1. 79
22.79
Max
2803
825.38
123
First Reading For Entire File........ ..71
Last Reading For Entire File......... ..2803
File Trailer
Service name...... ...... .STSLIB.002
Service Sub Level Name...
Version Number... ....... .1.0.0
Date of Generation..... ..02/06/06
Maximum Physical Record. .65535
File Type................LO
Next File Name......... ..STSLIB.003
Physical EOF
File Header
Service name.. ... ...... ..STSLIB.003
Service Sub Level Name...
Version Number..... ......1.0.0
Date of Generation. ..... .02/06/06
Maximum Physical Record. .65535
File Type......... ...... .LO
Previous File Name... ... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
3
Mean Nsam
1437 5465
140.638 5378.
60.7017 5379
¡i
.0
78 .4
.0
.0
First
Reading
71
114.5
71
Last
Reading
2803
2803
2760
(
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
(
header data for each bit run in separate files.
2
.5000
START DEPTH
2760.5
2803.5
STOP DEPTH
4363.0
4422.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type........ ..........0
Data Specification Block Type.....O
Logging Direction........ ........ . Down
Optical log depth units.. ........ .Feet
Data Reference Point..... ........ .Undefined
Frame Spacing... ......... ........ .60 .1~N
Max frames per record...... ...... .Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
ROP MWD020
GR MWD020
21-0CT-01
Insite
66.16
Memory
4422.0
2803.0
4422.0
38.6
45.0
TOOL NUMBER
PB02161HWRGF6
13.500
80.0
Spud Mud
9.20
300.0
8.5
400
8.4
.000
.000
.000
.000
.0
82.6
.0
.0
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
{
(
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2760.5 4422 3591.25 3324 2760.5 4422
ROP MWD020 FT/H 1.4 1112.83 214.282 3238 2803.5 4422
GR MWD020 API 20.06 145.38 82.125 3206 2760.5 4363
First Reading For Entire File......... .2760.5
Last Reading For Entire File.. .... .....4422
File Trailer
Service name... ...... ... .STSLIB.003
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation..... ..02/06/06
Maximum Physical Record..65535
File Type.. ...... ....... .LO
Next File Name...... ... ..STSLIB.004
Physical EOF
File Header
Service name.. ... ....... .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/06/06
Maximum Physical Record. .65535
File Type.............. ..LO
Previous File Name..... ..STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
4
header data for each bit run in separate files.
3
.5000
START DEPTH
4363.5
4390.5
4390.5
4390.5
4390.5
4390.5
4422.5
STOP DEPTH
6613.5
6606.0
6606.0
6606.0
6606.0
6606.0
6666.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
25-0CT-Ol
Insite
66.16
Memory
6666.0
4422.0
6666.0
39.3
42.3
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
TOOL NUMBER
PB02161HWRGF6
PB02161HWRGF6
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
9.875
4407.0
I
~,
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
9.40
90.0
8.2
350
8.6
2.600
1.880
3.500
4.250
72.0
102.0
72.0
72 .0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... ..............0
Data Specification Block Type.. ...0
Logging Direction................ . Down
Optical log depth units.. ........ .Feet
Data Reference Point... .......... .Undefined
Frame Spacing. ......... .......... .60 .1IN
Max frames per record.. ........ ...Undefined
Absent value........... ........ ...-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 4363.5 6666.5 5515 4607 4363.5 6666.5
ROP MWD030 FT/H 0.55 551.76 174.76 4489 4422.5 6666.5
GR MWD030 API 10.52 126.01 65.5934 4501 4363.5 6613.5
RPX MWD030 OHMM 0.37 42.08 3.23623 4432 4390.5 6606
RPS MWD030 OHMM 0.4 899.09 3.60294 4432 4390.5 6606
RPM MWD030 OHMM 0.39 1952 6.21607 4432 4390.5 6606
RPD MWD030 OHMM 0.52 2000 17 . 3508 4432 4390.5 6606
FET MWD030 HOUR 0.19 71. 56 2.07022 4432 4390.5 6606
First Reading For Entire File......... .4363.5
Last Reading For Entire File.......... .6666.5
File Trailer
Service name... ........ ..STSLIB.004
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation..... ..02/06/06
Maximum Physical Record..65535
File Type.... .......... ..LO
Next File Name... ...... ..STSLIB.005
~:
Physical EOF
File Header
Service name....... ......STSLIB.005
Service Sub Level Name...
Version Number. ......... .1.0.0
Date of Generation...... .02/06/06
Maximum Physical Record..65535
File Type................LO
Previous File Name.... ...STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NPHI
FCNT
NCNT
PEF
RHOB
DRHO
RPM
RPS
RPD
FET
RPX
GR
ROP
$
5
('
header data for each bit run in separate files.
4
.5000
START DEPTH
6552.0
6552.0
6552.0
6561.0
6561.0
6561.0
6606.5
6606.5
6606.5
6606.5
6606.5
6614.0
6667.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
CNP
SLD
$
STOP DEPTH
10199.0
10199.0
10199.0
10208.0
10208.0
10208.0
10235.0
10235.0
10235.0
10235.0
10235.0
10243.0
10315.0
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
STABILIZED LITHO DEN
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
28-0CT-01
Insite
66.16
Memory
10315.0
6666.0
10315.0
29.5
44.4
TOOL NUMBER
PBO2202NL6
PBO2202NL6
PBO2202NL6
PBO2202NL6
9.875
4407.0
LSND
10.30
48.0
9.0
800
4.2
1. 800
.940
1.700
2.600
72.0
143.6
72.0
72.0
(
(
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.. .... ........ ....0
Data Specification Block Type.....O
Logging Direction.... ............ . Down
Optical log depth units.......... .Feet
Data Reference Point.... .....,... .Undefined
Frame Spacing...... .............. .60 .1IN
Max frames per record. ........ ... .Undefined
Absent value......... ........ .... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
NPHI MWD040 PU-S 4 1 68 32 9
FCNT MWD040 CNTS 4 1 68 36 10
NCNT MWD040 CNTS 4 1 68 40 11
RHOB MWD040 G/CM 4 1 68 44 12
DRHO MWD040 G/CM 4 1 68 48 13
PEF MWD040 BARN 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 6552 10315 8433.5 7527 6552 10315
ROP MWD040 FT/H 0.51 478.34 130.72 7297 6667 10315
GR MWD040 API 20.37 304.77 90.9925 7259 6614 10243
RPX MWD040 OHMM 0.73 121.73 4.57414 7258 6606.5 10235
RPS MWD040 OHMM 0.68 218.71 5.17319 7258 6606.5 10235
RPM MWD040 OHMM 0.69 227.85 5.37333 7258 6606.5 10235
RPD MWD040 OHMM 0.69 213.57 5.78206 7258 6606.5 10235
FET MWD040 HOUR 0.43 22.47 1. 50125 7258 6606.5 10235
NPHI MWD040 PU-S 18.63 65.89 35.4407 7295 6552 10199
FCNT MWD040 CNTS 443.12 795 567.79 7295 6552 10199
NCNT MWD040 CNTS 2203.87 3136 2616.06 7295 6552 10199
RHOB MWD040 G/CM 1. 881 3.049 2.38378 7295 6561 10208
DRHO MWD040 G/CM -0.224 0.733 0.0419713 7295 6561 10208
PEF MWD040 BARN 1. 31 8.14 2.41661 7295 6561 10208
First Reading For Entire File.. ...... ..6552
Last Reading For Entire File... .".'. ..10315
File Trailer
Service name... ...... ....STSLIB.005
Service Sub Level Name...
Version Number.. .... ... ..1.0.0
Date of Generation. .... ..02/06/06
Maximum Physical Record..65535
File Type................LO
Next File Name...... ... ..STSLIB.006
Physical EOF
Tape Trailer
.,.
(
Service name.... ....... ..LISTPE
Date.....................02/06/06
Origin...................STS
Tape Name. ........,.... ..UNKNOWN
Continuation Number..... .01
Next Tape Name... ....... . UNKNOWN
Comments.................STS LIS
Reel Trailer
Service name.. ... ... ... ..LISTPE
Date.....................02/06/06
Origin...................STS
Reel Name....... ....... ..UNKNOWN
Continuation Number. ... ..01
Next Reel Name. .... .... ..UNKNOWN
Comments.................STS LIS
Physical EOF
Physical EOF
End Of LIS File
Writing Library.
Writing Library.
(
Scientific Technical Services
Scientific Technical Services