HomeMy WebLinkAbout213-1617. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU C-23D
Mill CIBP
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
213-161
50-029-20775-04-00
13251
Surface
Intermediate
Liner
Liner
Liner
9021
2660
8548
918
604
3783
13115
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9023
34 - 2694
32 - 8580
8426 - 9344
9156 - 9760
9367 - 13150
34 - 2694
32 - 7698
7575 - 8400
8221 - 8777
8422 - 9023
13055
2670
4760
5410
7500
10530
None
5380
6870
7240
8430
10160
10330 - 13112
4-1/2" 12.6# L80 30 - 9167
9022 - 9023
Conductor 80 20" 34 - 114 34 - 114 1490 470
4-1/2" Baker S3 Packer
9110
8178
Torin Roschinger
Operations Manager
Leif Knatterud
leif.knatterud@hilcorp.com
9075644667
PRUDHOE BAY, Prudhoe Oil
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028305, 0028310
30 - 8232
N/A
N/A
575
445
25169
45357
489
0
375
840
1120
830
N/A
13b. Pools active after work:Prudhoe Oil
No SSSV Installed
9110, 8178
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 10:17 am, Jun 13, 2025
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2025.06.13 04:40:23 -
08'00'
Torin Roschinger
(4662)
JJL 6/30/25
RBDMS JSB 061825
DSR-6/18/25
ACTIVITY DATE SUMMARY
6/5/2025
SLB CTU #8 1.75"CT 0.156"WT. Job Scope: Mill CIBP
Mobilize CTU #8 & MIRU. Start 7 day BOP test.
***Job Continued on 6/6/25***
6/6/2025
SLB CTU #8 1.75" .156" WT. Job Scope: Mill CIBP
Complete 7 day BOP test. Function test BOP on well. Make up BOT 2.80" Junk mill
BHA & RIH. Tag CIBP @ 10,880' CTM. Milled on CIBP for ~ 2 hour 35 mins w/ 3
stalls before lost WHP and CIBP started moving. Worked milled CIBP down &
tagged XO @ 13,048' E / 13.057' M. POOH, FP TBG. RDMO CTU
***Job Complete***
6/7/2025
***WELL S/I ON ARRIVAL***
DRIFT & BRUSH TBG TO 9140' SLM
SET DREAM CATCHER IN X NIPPLE @ 9133' MD
RUN CHECK SET TO CONFIRM DREAM CATCHER SET
***WELL SI ON DEPARTURE***
Daily Report of Well Operations
PBU C-23D
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU C-23D
Extended Perf w CTU
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
213-161
50-029-20775-04-00
13251
Surface
Intermediate
Liner
Liner
Liner
9021
2660
8548
918
604
3783
10875
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9023
34 - 2694
32 - 8580
8426 - 9344
9156 - 9760
9367 - 13150
34 - 2694
32 - 7698
7575 - 8400
8221 - 8777
8422 - 9023
13055
2670
4760
5410
7500
10530
10875
5380
6870
7240
8430
10160
10330 - 13112
4-1/2" 12.6# L80 30 - 9167
9022 - 9023
Conductor 80 20" 34 - 114 34 - 114 1490 470
4-1/2" Baker S3 Packer
9110
8178
Torin Roschinger
Operations Manager
Finn Oestgaard
finn.oestgaard@hilcorp.com
907-564-5026
PRUDHOE BAY, Prudhoe Oil
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028305, 0028310
30 - 8232
N/A
N/A
400
1107
43932
39458
192
82
500
1450
1200
900
324-595
13b. Pools active after work:Prudhoe Oil
No SSSV Installed
9110, 8178
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 1:10 pm, Nov 21, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.11.21 12:52:17 -
09'00'
Torin
Roschinger
(4662)
RBDMS JSB 112724
WCB 2-11-2025
DSR-11/21/24
ACTIVITYDATE SUMMARY
11/11/2024
***WELL S/I ON ARRIVAL***
PULLED 4-1/2' DREAMCATCHER FROM X-NIP @ 9,133' MD(empty)
***WELL LEFT S/I ON DEPARTURE, PAD-OP NOTIFIED OF STATUS***
11/16/2024
SLB CTU 8, 1.75" x .156 GT-90. Job Objective: Set CIBP and Extended adperf
MIRU. Make up HES logging tools and RIH. L&K well with KCL while RIH. Log from
11,000' - 9,000' and flag pipe at 10,850'. POOH and download data -13' correction
confirmed by geo. Make up NS 3-1/4" CIBP BHA and RIH. Set CIBP at 10875. PUH
and pressure test plug. Circ out well with 1%KCL.
***Job Continued on 11/17/2024***
11/17/2024
SLB CTU 8, 1.75" x .156 GT-90. Job Objective: Set CIBP and Extended adperf
Flow check well and POOH pumping pipe displacement. Flow check well at surface,
no flow. Well control drill with all crews - kick while tripping. Open hole deploy 220' of
2" perf guns. RIH and tag CIBP, correct depth to bottom shot. PUH and perforate
10,330-10,550 with HES 2" MaxForce guns 6spf 60 degree phasing. POOH
maintainin hole fill. Flow check well at surface and undeploy perf guns. FP Tubing
and RDMO CTU.
***Job Complete***
Daily Report of Well Operations
PBU C-23D
y
perforateg
10,330-10,550
g
Make up NS 3-1/4" CIBP BHA and RIH. Set CIBP at 10875
7. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field:
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in this pool?
Will perfs require a spacing exception due to property boundaries?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStratigraphicExploratory
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
AOGCC USE ONLY
Commission Representative:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other Conditions of Approval:
Post Initial Injection MIT Req'd?Yes No
Subsequent Form Required:
Approved By:Date:
APPROVED BY
THE AOGCCCOMMISSIONER
PBU C-23D
Ext Add Perf w CTU
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK
99503
213-161
50-029-20775-04-00
341J
ADL 0028305, 0028310
13251
Surface
Intermediate
Liner
Liner
Liner
9021
2660
8548
918
604
3783
13115
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9023
34 - 2694
32 - 8580
8426 - 9344
9156 - 9760
9367 - 13150
2490
34 - 2694
32 - 7698
7575 - 8400
8221 - 8777
8422 - 9023
13055
2670
4760
5410
7500
10530
None
5380
6870
7240
8430
10160
10950 - 13112 4-1/2" 12.6# L80 30 - 91679020 - 9023
Conductor 80 20" 34 - 114 34 - 114 1490 470
4-1/2" Baker S3 Packer
No SSSV Installed
9110, 8178
Date:
Torin Roschinger
Operations Manager
Finn Oestgaard
finn.oestgaard@hilcorp.com
907.564.5026
PRUDHOE BAY
11/10/2024
Current Pools:
Prudhoe Oil
Proposed Pools:
Prudhoe Oil
Suspension Expiration Date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.10.11 16:31:34 -
08'00'
Torin
Roschinger
(4662)
324-595
By Grace Christianson at 8:30 am, Oct 14, 2024
Perforate
DSR-10/14/24SFD 10/26/2024MGR28OCT24
10-404
JLC 10/29/2024
Gregory Wilson Digitally signed by Gregory Wilson
Date: 2024.10.30 05:24:26 -08'00'10/30/24
RBDMS JSB 103024
CCT Extended Adperf
Well:C-23D
Well Name:C-23D API Number::50-029-020775-04
Current Status::Operable producer, offline Pad::C-Pad
Estimated Start Date::11/10/2024 Rig::CT
Reg.. Approval Req’d?10-403/10-404 Date RReg. Approval Rec’vd::
Regulatory Contact:Abbie Barker Permit to Drill Number:2131610
First Call Engineer Finn Oestgaard Contact:907-350-8420 (C)
Second CCall Engineer:Michael Hibbert Contact:907-903-5990 (C)
Current Bottom Hole Pressure:3250 psi Estimated based on average Ivishak Pressure
KWF:7.2 ppg Use seawater or 1% KCL
MPSP:2490 psi Most recent SIWHP – 8/24/24
Max Dev:98 deg At 12,695’ MD
Min ID:2.377” 13,055’ MD
Tie In Log Halliburton Coil Flag 10/26/23
Last SIWHP 2490 psi - 8/24/2024
Brief Well Summary:
C-23D is a coil sidetrack drilled in 2013 targeting the oil column in Z2 just above the MHO. Over it’s lifetime the
well has gone through 4 stages of plug and perfs. In May of this year all perforations were opened to flow and
showed minimal recharge. The well is currently SI for HGOR. This intervention will set a plug shutting off all
current perforation open to flow and target accessing sands towards the heel of the well in between what is
believed to be MHOand the vertical section of the well. Due to the proximity to the MHO premium charges are
being selected.
Objective:
Set CIBP & Perforate 220’ of Z2A.
Procedure:
Slickline
1. Pull dream catcher, if contains any contents send pictures to Finn Oestgaard
Coiled Tubing –Drift/Tie-In & Plugset
1. MU Tie-In/Drift BHA (configuration per WSL discretion), RIH and flag for plug set (target set depth
10,875’) Contact Finn Oestgaard & Corey Ramstad for tie-in correlation.
2. Set CIBPmid element @ 10,875’
Setting in 3-1/4” Liner 6.6#, ID = 2.85” (will need to pass through 3-1/2” Xnipple @ 9,527’ w/ ID=2.812”)
Coil –Extended Perforating
Notes:
x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations
x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS
coverage is required.
The well will be killed and monitored before making up the initial perf guns. This is generally done during the
drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating
bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by
bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head.
CCT Extended Adperf
Well:C-23D
1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through
the brass upon POOH with guns.
2. Bullhead 1.2x wellbore volume ~186 bbls 1% KCL/SW down tubing. Max tubing pressure 2500 psi.
(This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the
well kill is at the discretion of the WSS.)
a.Wellbore volume to top perf (10,950’)=155 bbls
b. 4-1/2” Tubing – 9,367’ X .0152 bpf = 142 bbl
c. 3-1/2” Liner – 54’ X 0.0087 bpf = 1 bbls
d. 3-1/4” Liner – 843’ X 0.0079 bpf = 12 bbls
3. At surface, prepare for deployment of TCP guns.
4. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/ KKWF, 8.4 ppg 1% KCl or 8.5
ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established.
Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and
there is no excess flow.
5.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well
control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun
string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily
accessible near the working platform for quick deployment if necessary.
e.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns
one time to confirm the threads are compatible.
6.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly
monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed
while deploying perf guns to ensure the well remains killed and there is no excess flow.
Perf Schedule
Use 2”Maxforce 070 charges 6 SPF
Perf Interval (tie-in depths)Total Gun
Length
Weight of Gun (lbs)
10,330’ – 10,550’ – gun 220’~1518 lbs (5.58 ppf)
7. RIH with perf gun and lightly tag CIBP for depth control. Pickup and perforate interval per Perf Schedule
above.
a. Note any tubing pressure change in WSR.
8. After perforating, PUH to top of liner or into tubing to ensure debris doesn’t fall in on the guns and stick
the BHA. Confirm well is dead and re-kill if necessary before pulling to surface.
9. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary.
10. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and
commencing breakdown of TCP gun string.
11. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA.
12. RDMO CTU.
13. Turn well over to Operations POP.
Make up PCE. - mgr
CCT Extended Adperf
Well:C-23D
Attachments:
x Wellbore Schematic
x Proposed Schematic
x Tie-In Log
x BOPE diagram
x Standing Orders
x Equipment Layout diagram
x Sundry Change Form
CCT Extended Adperf
Well:C-23D
Current Schematic
CCT Extended Adperf
Well:C-23D
CCT Extended Adperf
Well:C-23D
Proposed Wellbore Schematic
CIBP @ 10,880’
Proposed Perforations
10,330’ – 10,550’ (220’)
CCT Extended Adperf
Well:C-23D
Tie-In Log
CCT Extended Adperf
Well:C-23D
Perforate 10,330’ – 10,550’
CCT Extended Adperf
Well:C-23D
Set CIBP Mid-Element @ 10,875’
CCT Extended Adperf
Well:C-23D
BOP Schematic
CCT Extended Adperf
Well:C-23D
CCT Extended Adperf
Well:C-23D
CCT Extended Adperf
Well:C-23D
Changes to Approved Sundry Procedure
Date:
Subject:
Sundry #:
Any modifications to an approved sundry will be documented and approved below. Changes to an approved
sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is
required before implementing the change.
Step Page Date Procedure Change
HNS
Prepared
BBy (Initials)
HNS
Approved
By
(Initials)
AOGCC Written
Approval
Received
(Person and
Date)
Approval:
Operations Manager Date
Prepared:
Operations Engineer Date
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU C-23D
Mill CIBP
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
213-161
50-029-20775-04-00
13251
Surface
Intermediate
Liner
Liner
Liner
9021
2660
8548
918
604
3783
13115
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9023
34 - 2694
32 - 8580
8426 - 9344
9156 - 9760
9367 - 13150
34 - 2694
32 - 7698
7575 - 8400
8221 - 8777
8422 - 9023
13055
2670
4760
5410
7500
10530
None
5380
6870
7240
8430
10160
10950 - 13112
4-1/2" 12.6# L80 30 - 9167
9020 - 9023
Conductor 80 20" 34 - 114 34 - 114 1490 470
4-1/2" Baker S3 Packer
9110
8178
Torin Roschinger
Operations Manager
Michael Hibbert
michael.hibbert@hilcorp.com
907-903-5990
PRUDHOE BAY, Prudhoe Oil
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028305, 0028310
30 - 8232
N/A
N/A
177
577
17231
31042
30
846
200
1450
990
980
N/A
13b. Pools active after work:Prudhoe Oil
No SSSV Installed
9110, 8178
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 7:57 am, May 22, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2024.05.21 16:45:20 -08'00'
Torin
Roschinger
(4662)
DSR-5/22/24WCB 7-30-2024
RBDMS JSB 052824
ACTIVITY DATE SUMMARY
5/15/2024
LRS CTU 1, 1.5" Blue Coil. Job Objective: Mill CIBP
MIRU. Function test BOPs upon installation. Make up and RIH with BOT 2.75"
venturi burnshoe BHA. Load well with 170 bbl of 1% KCL. Tag plug at 11366 and
begin milling. Shortly after milling, plug lost seal and lost returns. PUH and have
sticky and eratic weights. Work pipe out of liner and bullhead well again. RBIH to
resume milling the CIBP. Stopped making progress and able to get a stall. POOH to
check tools. Had a very minimal amount of slip material in the venturi. Shoe had
minimal wear and not packed off, nor screen plugged off - did not lose suction. Drop
venturi and swap to a 2.75" junk mill. Tag plug 11,374' ctmd, continue milling. Got the
plug moving, chased down to 13,075' CTMD, POOH.
***Job Continued 5/16/24***
5/16/2024
LRS CTU 1, 1.5" Blue Coil. Job Objective: Mill CIBP ***Job continued from
5/15/24***
Make up and RIH with BOT 2.75" venturi burnshoe BHA. Tag 13,071' ctmd. Burn on
plugs, Stack weight down and POOH dry. OOH with venturi and had ~1/4 cup of
steel debris in venturi, no core. Relay results to OE and decision to RDMO and have
slickline set a dream catcher. Well freeze protected with 5bbl of 60/40 and 33 bbl of
diesel. Pad operator notified of well status. RDMO.
***Job Complete***
5/16/2024
*** WELL SHUT IN ON ARRIVAL ***
STANDBY FOR WELL SUPPORT
*** CONTINUE WSR ONTO 5/17/24 ***
5/17/2024
*** CONTINUED WSR FROM 5/16/24 ***
SET DREAM CATCHER IN X-NIPPLE @ 9,133' MD (OAL-38")
*** WELL SHUT IN ON DEPARTURE ***
Daily Report of Well Operations
PBU C-23D
Tag plug at 11366 and gg
begin milling. Shortly after milling, plug lost seal and lost returns. PUH and haveggy gg
sticky and eratic weights. Work pipe out of liner and bullhead wefll again. RBIH toygg
resume milling the CIBP. Stopped making progress and able to get a stall. POOH to gggg
check tools. Had a very minimal amount of slip material in the venturi. Shoe had y
minimal wear and not packed off, nor screen plugged off - did not lose suction. Dropgg
venturi and swap to a 2.75" junk mill. Tag plug 11,374' ctmd, continue milling. Got the jgg
plug moving, chased down to 13,075' CTMD, POOH
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU C-23D
Extended Perf w CTU, Mill CIBP
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
213-161
50-029-20775-04-00
13251
Surface
Intermediate
Liner
Liner
Liner
9021
2660
8548
918
604
3783
11355
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9024
34 - 2694
32 - 8580
8426 - 9344
9156 - 9760
9367 - 13150
34 - 2694
32 - 7698
7575 - 8400
8221 - 8777
8422 - 9023
13045
2670
4760
5410
7500
10530
11355
5380
6870
7240
8430
10160
10950 - 13112
4-1/2" 12.6# L80 30 - 9167
9020 - 9023
Conductor 80 20" 34 - 114 34 - 114 1490 470
4-1/2" Baker S3 Packer 9110, 8178
9110
8178
Aras Worthington
for Torin Roschinger
Operations Manager
Michael Hibbert
michael.hibbert@hilcorp.com
907-903-5990
PRUDHOE BAY, Prudhoe Oil
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028305, 0028310
30 - 8232
N/A
N/A
396
866
36468
5743
48
472
1130
1450
899
360
323-485
13b. Pools active after work:Prudhoe Oil
No SSSV Installed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Samantha Carlisle at 10:03 am, Nov 14, 2023
Digitally signed by Aras
Worthington (4643)
DN: cn=Aras
Worthington (4643)
Date: 2023.11.10
16:39:57 -09'00'
Aras
Worthington
(4643)
DSR-11/15/23
RBDMS JSB 111623
WCB 4-26-2024
ACTIVITY DATE SUMMARY
10/25/2023
LRS CTU #1 1.5" Blue Coil Job Scope: Mill CIBP, Set CIBP
MIRU. Function test BOPs on the well. RIH with YJ 2.75" venturi/burshoe BHA.
Tagged high at 11532 and worked down to CIBP at 12040 CTM. Milled CIBP and
pushed down to XO at 13045 CTM. Worked CIBP at XO and POOH.
***Job in Continued on 10/26/2023***
10/26/2023
LRS CTU 1, 1.5" Blue Coil. Job Objective: Mill CIBP, Set CIBP, & Extended Adperf.
POOH with 2.75" venturi burnshoe BHA. CT back at surface and freeze protect the
flowline with 10bbl of 60/40, 64 bbl of diesel, and 5 bbl of 60/40. Lay down venturi
and recovere 4 slip segments, multiple pieces of a cone, and a body lock ring. Make
up northern solutions 1.69" CTC and bump up against brass. RIH with HES 2.400"
GR/CCL carrier and 2.5" JSN. Tag multiple times starting at 10220. perform fluff and
stuff to 11,450. Dry drift from 10,200 down to 11,450. log to 9,500'. POOH +2'
correction. M/U NS Premium bridge plug, RIH Kill well w/160bbls SW, 10bbls 60/40,
Correct depth at flag to mid element. Set plug at 11,355' POOH maintaining hole fill.
Overpull at packer at 9100 CTM - similar to previous coil CIBP sets in this well. Work
pipe and get free. POOH circulating well to 1% slick KCL.
***Job Continued on 10/27/2023***
10/27/2023
LRS CTU 1, 1.5" Blue Coil. Job Objective: Mill CIBP, Set CIBP, & Extended Adperf.
Continue POOH with CIBP setting BHA circulating well to 1% slick KCL. Lay in 60/40
from 2500'. Hold well control drill - kick while deploying guns. Flow check well at
surface, no flow. Lay down CIBP setting BHA. Deploy perf gun BHA. RIH, correct
depth off CIBP. Perforate interval 10,950'-11,115' w/ 2" HES MaxForce guns 60
degree phase 6SPF. POOH, Maintaining hole fill, L/D perf guns. Freeze protect well
with 38bbls 60/40. RDMO
***Job Complete***
Daily Report of Well Operations
PBU C-23D
Milled CIBP andgg g
pushed down to XO at 13045 CTM.
ygyg
Perforate interval 10,950'-11,115' w/ 2" HES MaxForce guns 60
degree phase 6SPF. POOH
g
Set plug at 11,355' POOH
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU C-23D
Mill CIBP, Extended Perf w CTU
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
213-161
50-029-20775-04-00
13251
Surface
Intermediate
Liner
Liner
Liner
9021
2660
8548
918
604
3783
12050
13-3/8"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9025
34 - 2694
32 - 8580
8426 - 9344
9156 - 9760
9367 - 13150
34 - 2694
32 - 7698
7575 - 8400
8221 - 8777
8422 - 9023
13055
2670
4760
5410
7500
10530
12050
4930
6870
7240
8430
10160
11402 - 13112
4-1/2" 12.6# L-80 30 - 9167
9022 - 9023
Conductor 80 20" 34 - 114 34 - 114 1490 470
4-1/2" Baker S3 9110, 8178
9110
8178
Stan Golis
Sr. Area Operations Manager
Ron Phillips
Ron.Phillips@hilcorp.com
907.317.5092
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028310, 0028305
30 - 8232
N/A
N/A
445
1766
36464
18148
66
894
1400
300
891
769
322-467
13b. Pools active after work:Prudhoe Oil
No SSSV Installed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Meredith Guhl at 7:24 am, Jan 23, 2023
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2023.01.20 16:35:35 -09'00'
Stan Golis
(880)
PBU C-23D
RBDMS JSB 012623
MDG 9/13/2023
PRUDHOE BAY, PRUDHOE OIL
Perforate
Mill CIBP, Extended Perf w CTU
Sundry Number
322-467
DSR-1/23/23
213-161
Plug Perforations
il d biCoiled Tubing Ops
WCB 11-3-2023
ACTIVITY DATE SUMMARY
1/7/2023
T/I/O = SSV/1250/0+. Temp = SI. Bleed IAP to 300 psi (pre coil). No AL. IA FL @
5788' (Sta# 4 Dome, 309 bbls). Bled IA to OT to 300 psi in 2.25 hrs. IA FL
unchanged. Monitored for 30 min, IAP unchanged, IA FL unchanged. FWHP's =
SSV/300/0.
SV, WV, SSV = C. MV = O. IA & OA = OTG. 14:40.
1/9/2023
LRS CTU 2 1.5" Blue Coil, Job Objective: Mill CIBP, Set CIBP, and extended Adperf
MIRU CTU. Bullhead 260 bbls of kcl. RIH with YJ 1.69" milling BHA with 2.70" 3-bld
junk mill. Tagged plug at 12687 CTM and milled plug. Pushed to 12720 CTM and got
bit stuck. Worked pipe free and POOH. Swap to 2.125" motor and 2.700" venturi
burnshoe.
***Job Continued on 1/10/2023***
1/10/2023
LRS CTU 2 1.5" Blue Coil, Job Objective: Mill CIBP, Set CIBP, and extended Adperf
Continue in hole with 2.125" motor and 2.700" venturi burnshoe.Begin running venturi
at 11600'. Work plug down to 13024 and begin stalling. Continue to work plug down
to 2.875" XO at 13055 CTM. Recover half top of CIBP. Relay results to OE and
decision made to leave remants at 13055' and move forward. Make up HES logging
& CIBP drift BHA. Log from 12300' -10700' w/ flag at 12050'. Log shows a -8'
correction. Tied- in to PDS Coil Flag log dated 21- May -2014. Make up and RIH with
NS 3.25" CIBP (OD =2.5"). Tie in at flag and set CIBP at 12050'. POOH pumping
pipe displacement. Overpulled at the production packer 9100' - same as last coil
CIBP set. Lay in diesel freeze protect from 3500'.
***Job Continued on 1/11/22***
1/11/2023
LRS CTU 2 1.5" Blue Coil, Job Objective: Mill CIBP, Set CIBP, and Extended Adperf
Continue to lay in diesel freeze protect from 3500'. Lay down CIBP setting BHA.
Perform weekly BOP test 250/4000. Start standing by for winds.
***Job Continued on 1/11/22***
1/12/2023
LRS CTU #2 1.5" Blue Coil. Job Objective: Mill CIBP, Set CIBP, Extended Adperf
Continue standing by for high winds.
***Job in Progress***
1/13/2023
LRS CTU #2 1.5" Blue Coil. Job Objective: Mill CIBP, Set CIBP, Extended Adperf
Continue standing by for high winds. MU YJ 1.69" MHA & PT. Clear snow around the
unit for the WS crane and HES gun trailer. Perform no-flow test and prep to deploy
perf guns.
***Job in Progress***
1/14/2023
LRS CTU #2 1.5" Blue Coil. Job Objective: Mill CIBP, Set CIBP, Extended Adperf
MU & open hole deploy HES 2.00" x 240' (220' loaded) Maxforce, 6 SPF, 60 degree
phased guns. RIH & tag 3-1/4" CIBP at 12,050' MD. PU and perforate 11,402' -
11,502' & 11,522' - 11,642'. Good indication of shot, WHP went on a vac. POOH
while loading the well with KCL down the CTBS. Flow check well and the well is on
minimal losses. Retreive perf gun. Freeze protect well with 10bbl of 60/40 and 28bbl
of diesel. Pad Operator notified on well status and to POP with DPBGL. RDMO.
***Job Complete***
Daily Report of Well Operations
PBU C-23D
Bullhead 260 bbls of kcl. RIH with YJ 1.69" milling BHA with 2.70" 3-bld g
junk mill. Tagged plug at 12687 CTM and milled plug. Pushed to 12720 CTM and got j
bit stuck.
LRS CTU 2 1.5" Blue Coil, Job Objective: Mill CIBP, Set CIBP, and extended Adperfj
j
MU & open hole deploy HES 2.00" x 240' (220' loaded) Maxforce, 6 SPF, 60 degreey()
phased guns. RIH & tag 3-1/4" CIBP at 12,050' MD. PU and perforate 11,402' -gg
11,502' & 11,522' - 11,642'
j
Continue in hole with 2.125" motor and 2.700" venturi burnshoe.Begin running venturigg
at 11600'. Work plug down to 13024 and begin stalling. Continue to work plug down gggg
to 2.875" XO at 13055 CTM. Recover half top of CIBP. Relay results to OE andy
decision made to leave remants at 13055' and move forward.
Worked pipe free and POOH
gg g
The new CIBP and the milled CIBP fish are shown at the
correct depths on the new WBS, below. -WCB
WHP went on a vac. POOH
while loading the well with KCL down the CTBS. Flow check well and the well is ong
minimal losses. Retreive perf gun. Freeze protect well with 10bbl of 60/40 and 28bbl
of diesel.
Make up HES logging
& CIBP drift BHA. Log from 12300' -10700' w/ flag at 12050'. Log shows a -8' g gg
correction. Tied- in to PDS Coil Flag log dated 21- May -2014. Make up and RIH withgg y
NS 3.25" CIBP (OD =2.5"). Tie in at flag and set CIBP at 12050'.
,ISHUIRUDWLQJ
7\SHRI5HTXHVW
2SHUDWRU1DPH
$GGUHVV
&XUUHQW:HOO&ODVV3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
:HOO1DPHDQG1XPEHU
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU)LHOG3RROV
$EDQGRQ
6XVSHQG
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO
3HUIRUDWH
3OXJ3HUIRUDWLRQV
5HHQWHU6XVS:HOO
2WKHU6WLPXODWH
)UDFWXUH6WLPXODWH
$OWHU&DVLQJ
3XOO7XELQJ
5HSDLU:HOO
2WKHU
&KDQJH$SSURYHG3URJUDP
2SHUDWLRQVVKXWGRZQ
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKHVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
35(6(17:(//&21',7,216800$5<
3HUIRUDWLRQ'HSWK0'IW 3HUIRUDWLRQ'HSWK79'IW7XELQJ6L]H 7XELQJ*UDGH 7XELQJ0'IW
3DFNHUVDQG66697\SH3DFNHUVDQG66690'IWDQG79'IW
&DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH
([SORUDWRU\
6WUDWLJUDSKLF
'HYHORSPHQW
6HUYLFH
$WWDFKPHQWV
(VWLPDWHG'DWHIRU
&RPPHQFLQJ2SHUDWLRQV
:HOO&ODVVDIWHUSURSRVHGZRUN
:HOO6WDWXVDIWHUSURSRVHGZRUN
9HUEDO$SSURYDO
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURFDO
3URSRVDO6XPPDU\:HOOERUHVFKHPDWLF
%236NHWFK'HWDLOHG2SHUDWLRQV3URJUDP
2,/
*$6
:,1-
:$*
*,1-
:'63/
*6725
2S6KXWGRZQ
6XVSHQGHG
63/8*
$EDQGRQHG
6HUYLFH'HYHORSPHQW6WUDVWLJUDSKLF([SORUDWRU\
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$XWKRUL]HG7LWOH
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
$2*&&86(21/<
&RPPLVVLRQ5HSUHVHQWDWLYH
&RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
/RFDWLRQ&OHDUDQFH0HFKDQLFDO,QWHJULW\7HVW%237HVW3OXJ,QWHJULW\
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV
<HV 1R
1R 6XEVHTXHQW)RUP5HTXLUHG
$SSURYHG%\'DWH
$33529('%<
7+($2*&&&200,66,21(5
3%8&'
&78([WHQGHG
3HUIRUDWLQJ
+LOFRUS1RUWK6ORSH//&
&HQWHUSRLQW'U6XLWH
$QFKRUDJH$.
$'/
6XUIDFH
,QWHUPHGLDWH
/LQHU
/LQHU
/LQHU
[[
QRQH
/
&RQGXFWRU
%DNHU6
1R6669,QVWDOOHG
'DWH
6WDQ*ROLV
2SHUDWLRQV0DQDJHU
&ODLUH0D\ILHOG
&ODLUH0D\ILHOG#KLOFRUSFRP
358'+2(%$<358'+2(2,/
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
&RPP &RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
By Anne Prysunka at 4:09 pm, Aug 05, 2022
'LJLWDOO\VLJQHGE\6WDQ*ROLV
'1FQ 6WDQ*ROLV
RX 8VHUV
'DWH
6WDQ*ROLV
&2-6)'
6)'
'650*5$8*
GWV -/&
Jeremy Price
Digitally signed by Jeremy
Price
Date: 2022.08.15 14:11:55
-08'00'
RBDMS JSB 081622
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
tĞůůEĂŵĞ͗ͲϮϯW/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϬϳϳϱͲϬϰ
ƵƌƌĞŶƚ^ƚĂƚƵƐ͗KƉĞƌĂďůĞ ZŝŐ͗^ůŝĐŬůŝŶĞͬ Žŝů
ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϯYϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϱĚĂLJƐ
ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞĂƌŬĞƌ ϱϲϰͲϰϵϭϱ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗Ϯϭϯϭϲϭ
&ŝƌƐƚ ĂůůŶŐŝŶĞĞƌ͗ůĂŝƌĞDĂLJĨŝĞůĚ ;ϳϭϯͿϰϰϯͲϯϲϯϭ ;ĐͿ ;ϵϬϳͿϱϲϰͲϰϯϳϱ ;ŽͿ
^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗EŽĞůEŽĐĂƐ ;ϵϬϳͿϮϮϵͲϵϱϯϮ;ĐͿ ;ϵϬϳͿϱϲϰͲϱϮϳϴ;ŽͿ
&EƵŵďĞƌ͗/KZ͗ϭϭϱ
džƉĞĐƚĞĚZĂƚĞƐ WŽƐƚ:Žď͗ ϮϲDD&͕ϴϱϬKW͕ϰϱtW͕ϱйt
ƐƚŝŵĂƚĞĚ ŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ϯϮϮϬ ƉƐŝΛϴ͕ϴϬϬ͛ds ϳ͘ϭ WW'
DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϯϱϬƉƐŝΛϴ͕ϴϬϬ͛dsϳ͘ϰWW'ͮǀĞƌĂŐĞ/ǀŝƐŚĂŬ,WͿ
DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϰϳϬƉƐŝ ;ĂƐĞĚŽŶϬ͘ϭƉƐŝͬĨƚ͘ŐĂƐŐƌĂĚŝĞŶƚͿ
>ĂƐƚ^/t,W͗ϮϰϬϬƉƐŝ ;dĂŬĞŶŽŶϭϭͬϯϬͬϮϬϭϰͿ
DŝŶ/͗Ϯ͘ϯϳϳ͟yKĂƚϭϯϬϱϱ͛D
DĂdžŶŐůĞ͗ϵϴĞŐΛϭϮϲϵϱ͛
dŝĞͲ/Ŷ >ŽŐ͗,/ZWD>ŽŐĂƚĞĚϭϮͲϭϬͲϮϬϭϯ
ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗
ϮϬϭϯŶĂƚƵƌĂůĨůŽǁƐŝĚĞƚƌĂĐŬŝŶƚŽϮ͕ͲϮϯŚĂƐϯϬϭ͛ŽĨŽƉĞŶƚŽĞƉĞƌĨƐĂŶĚĨůŽǁĞĚĨƵůůƚŝŵĞƵŶƚŝůŵŝĚϮϬϮϬ
ǁŚĞŶ'KZďĞĐĂŵĞƵŶĞĐŽŶŽŵŝĐ͘dŚĞŶĞdžƚƐƚĂŐĞŽĨƉĞƌĨƐ͕ϮϱϬ͛ǁĞƌĞ ĂĚĚĞĚƐƵĐĐĞƐƐĨƵůůLJŝŶDĂƌĐŚϮϬϮϭďƵƚƚŚĞ
'KZŚĂƐƐŝŶĐĞŝŶĐƌĞĂƐĞĚƚŽƵŶĞĐŽŶŽŵŝĐ ůĞǀĞůƐ͘dŚĞǁĞůůǁĂƐƌĞĐĞŶƚůLJĐLJĐůĞĚďƵƚĚŝĚŶŽƚĐLJĐůĞǁĞůůĂŶĚŝƐƌĞĂĚLJ
ĨŽƌŶĞdžƚƐƚĂŐĞŽĨƉĞƌĨƐ͘
KďũĞĐƚŝǀĞ͗
dŚĞŽďũĞĐƚŝǀĞŽĨƚŚĞƉƌŽŐƌĂŵŝƐƚŽŵĂŬĞƚŚĞǁĞůůŵŽƌĞĐŽŵƉĞƚŝƚŝǀĞďLJ ŝƐŽůĂƚŝŶŐƚŚĞĞdžŝƐƚŝŶŐƉĞƌĨŽƌĂƚŝŽŶƐĂŶĚ
ƐŚŽŽƚŝŶŐĂĚĚŝƚŝŽŶĂů ƉĞƌĨŽƌĂƚŝŽŶƐ͘ dŚĞĞdžŝƐƚŝŶŐ/WǁŝůůĂůƐŽďĞŵŝůůĞĚďĞĨŽƌĞƐĞƚƚŝŶŐƚŚĞŶĞǁƉůƵŐ͘
WƌŽĐĞĚƵƌĞ͗
^ůŝĐŬůŝŶĞ ;dŚŝƐƐƚĞƉŝƐĂƚƚŚĞt^>͛ƐĚŝƐĐƌĞƚŝŽŶ͘Ϳ
ϭ͘ D/Zh^ůŝĐŬůŝŶĞhŶŝƚĂŶĚƐƉŽƚĂŶĐŝůůĂƌLJĞƋƵŝƉŵĞŶƚ͘
Ϯ͘ Z/,tŝƚŚƵŵŵLJŐƵŶĚƌŝĨƚĂŶĚƐĂŵƉůĞďĂŝůĞƌƚŽĚĞǀŝĂƚŝŽŶĂŶĚĐ ŽůůĞĐƚƐĂŵƉůĞŝĨƉŽƐƐŝďůĞ͘/ĨƐĂŵƉůĞŝƐ
ĐŽůůĞĐƚĞĚƉůĞĂƐĞŶŽƚĞŝŶt'Z^ĂŶĚŶŽƚŝĨLJK͘
ŽŝůĞĚdƵďŝŶŐ
EŽƚĞƐ͗
x ƵĞƚŽƚŚĞŶĞĐĞƐƐĂƌLJŽƉĞŶŚŽůĞĚĞƉůŽLJŵĞŶƚŽĨdžƚĞŶĚĞĚWĞƌĨŽƌĂƚŝŶŐũŽďƐ͕ϮϰͲŚŽƵƌĐƌĞǁĂŶĚt^^
ĐŽǀĞƌĂŐĞŝƐƌĞƋƵŝƌĞĚ͘
x dŚĞǁĞůůǁŝůůďĞŬŝůůĞĚĂŶĚŵŽŶŝƚŽƌĞĚďĞĨŽƌĞŵĂŬŝŶŐƵƉƚŚĞŝŶŝƚŝĂůƉĞƌĨƐŐƵŶƐ͘dŚŝƐŝƐŐĞŶĞƌĂůůLJĚŽŶĞ
ĚƵƌŝŶŐƚŚĞĚƌŝĨƚͬůŽŐŐŝŶŐƌƵŶ͘ dŚŝƐǁŝůůƉƌŽǀŝĚĞŐƵŝĚĂŶĐĞĂƐƚŽǁ ŚĞƚŚĞƌƚŚĞǁĞůůǁŝůůďĞŬŝůůĞĚďLJ
ďƵůůŚĞĂĚŝŶŐŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚŽƵƚƚŚĞũŽď͘ /ĨƉƌĞ ƐƐƵƌĞŝƐƐĞĞŶŝŵŵĞĚŝĂƚĞůLJĂĨƚĞƌ
ƉĞƌĨŽƌĂƚŝŶŐ͕ŝƚǁŝůůĞŝƚŚĞƌďĞŬŝůůĞĚďLJďƵůůŚĞĂĚŝŶŐǁŚŝůĞWKK,ŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚƚŚĞ
ƐĂŵĞƉŽƌƚƚŚĂƚŽƉĞŶĞĚƚŽƐŚĞĂƌƚŚĞĨŝƌŝŶŐŚĞĂĚ͘
ϭ͘ ĨƚĞƌDhD,ĂŶĚƉƵůůƚĞƐƚŝŶŐƚŚĞd͕ƚĂŐͲƵƉŽŶƚŚĞdƐƚƌŝƉƉĞƌƚŽĞŶƐƵƌĞ,ĐĂŶŶŽƚƉƵůůƚŚƌŽƵŐŚ
ƚŚĞďƌĂƐƐƵƉŽŶWKK,ǁŝƚŚŐƵŶƐ͘
Ϯ͘ ZŝŐƵƉW'>ĞƋƵŝƉŵĞŶƚ͘
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
ϯ͘ Z/,ǁŝƚŚŵŽƚŽƌĂŶĚŵŝůůƚŽŵŝůůŽƵƚϯͲϭͬϰ͟/WĂƚϭϮ͕ϲϴϬ͛D͘WƵƐŚ/WƚŽďŽƚƚŽŵ͘
ϰ͘ ƵůůŚĞĂĚ ΕϮϲϬďďůƐ;ϭ͘ϱdžǁĞůůďŽƌĞǀŽůƵŵĞͿ ŽĨ<t&͕ϴ͘ϰƉƉŐϭй<ůŽƌ ƐĞĂǁĂƚĞƌ ĚŽǁŶƚŚĞƚƵďŝŶŐƚŽƚŚĞ
ĨŽƌŵĂƚŝŽŶ͘
Ă͘ tĞůůďŽƌĞǀŽůƵŵĞ ƚŽďŽƚƚŽŵ ƉĞƌĨс ϭϳϮ ďďůƐ
ď͘ ϰͲϭͬϮ͟dƵďŝŶŐ ʹ ϵϯϲϳ͛y͘ϬϭϱϮďƉĨс ϭϰϮ ďďůƐ
Đ͘ ϯͲϭͬϰ͟ >ŝŶĞƌ ʹ ϯϳϰϱ͛ ;ƚŽďŽƚƚŽŵƉĞƌĨͿ y͘ϬϬϳϵ ďƉĨс ϯϬ ďďůƐ
ϱ͘ DhĂŶĚZ/,ǁŝƚŚůŽŐŐŝŶŐƚŽŽůƐĂŶĚĚƌŝĨƚ ŶŽnjnjůĞ ƚŽƌĞƐĞŵďůĞ ϯͲϭͬϰ͟/W͘ ƌŝĨƚƚŽ ΕϭϮ͕ϭϬϬ͕͛ ůŽŐKK, ĂŶĚ
ĨůĂŐƉŝƉĞĂƐŶĞĐĞƐƐĂƌLJ͘
ϲ͘ WKK,ĂŶĚĐŽŶĨŝƌŵŐŽŽĚĚĂƚĂ͘ EŽƚŝĨLJKͬ'K ƚŽǀĞƌŝĨLJƚŝĞͲŝŶďĞĨŽ ƌĞƐĞƚƚŝŶŐ/W͘
ϳ͘ &ƌĞĞnjĞƉƌŽƚĞĐƚƚƵďŝŶŐĂƐŶĞĞĚĞĚ͘
ϴ͘ DhĂŶĚZ/,ǁŝƚŚ ϯͲϭͬϰ͟/W;t^>ƚŽĐŚŽŽƐĞǀĞŶĚŽƌͿ͘
ϵ͘ dŝĞͲŝŶƚŽĨůĂŐĂŶĚƐĞƚ/W ŵŝĚũŽŝŶƚĂǀŽŝĚŝŶŐĐŽůůĂƌƐ Ăƚ ΕϭϮ͕ϬϱϬ͛ŵĚ͘WKK,͘
ϭϬ͘ &ƌĞĞnjĞƉƌŽƚĞĐƚƚƵďŝŶŐĂƐŶĞĞĚĞĚ͘
ϭϭ͘ ƚƐƵƌĨĂĐĞ͕ƉƌĞƉĂƌĞĨŽƌ ĚĞƉůŽLJŵĞŶƚŽĨdWŐƵŶƐ͘
ϭϮ͘ ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘ůĞĞĚĂŶLJƉƌĞƐƐƵƌĞŽĨĨƚŽƌĞƚƵƌŶƚĂŶŬ͘<ŝůůǁĞůůǁͬ<t&͕ϴ͘ϰƉƉŐϭй<ůŽƌ
ƐĞĂǁĂƚĞƌ ĂƐŶĞĞĚĞĚ͘DĂŝŶƚĂŝŶĐŽŶƚŝŶƵŽƵƐŚŽůĞĨŝůůƚĂŬŝŶŐƌĞƚƵƌŶƐƚŽƚĂŶŬƵŶƚŝůůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶŝƐ
ƌĞĞƐƚĂďůŝƐŚĞĚ͘ &ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚǁŚŝůĞĚĞƉůŽLJŝŶŐƉĞƌĨŐƵŶƐƚŽĞŶƐƵƌĞƚŚĞǁĞůů
ƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘
ϭϯ͘ ΎWĞƌĨŽƌŵĚƌŝůůďLJƉŝĐŬŝŶŐ ƵƉƐĂĨĞƚLJũŽŝŶƚ ǁŝƚŚ d/tǀĂůǀĞĂŶĚƐƉ ĂĐĞŽƵƚďĞĨŽƌĞDhŐƵŶƐ͘ZĞǀŝĞǁ ǁĞůů
ĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐŵĂŬĞƵƉŽĨdWŐƵŶ
ƐƚƌŝŶŐ͘KŶĐĞƚŚĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞŚĂǀĞďĞĞŶƐƉĂĐĞĚŽƵƚ͕ŬĞĞƉƚŚĞƐĂĨĞƚLJũŽŝŶƚͬd/tǀĂůǀĞ
ƌĞĂĚŝůLJĂĐĐĞƐƐŝďůĞŶĞĂƌƚŚĞǁŽƌŬŝŶŐƉůĂƚĨŽƌŵĨŽƌƋƵŝĐŬĚĞƉůŽLJŵĞŶƚŝĨŶĞĐĞƐƐĂƌLJ͘
Ă͘ ƚƚŚĞďĞŐŝŶŶŝŶŐŽĨĞĂĐŚũŽď͕ƚŚĞĐƌŽƐƐŽǀĞƌͬƐĂĨĞƚLJũŽŝŶƚŵƵƐƚďĞƉŚLJƐŝĐĂůůLJDhƚŽƚŚĞƉĞƌĨŐƵŶƐ
ŽŶĞƚŝŵĞƚŽĐŽŶĨŝƌŵƚŚĞƚŚƌĞĂĚƐĂƌĞĐŽŵƉĂƚŝďůĞ͘
ϭϰ͘ ƌĞĂŬůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂƚYd^ĂŶĚďĞŐŝŶŵĂŬĞƵƉŽĨdWŐƵŶƐƉĞƌƐĐŚĞĚƵůĞďĞůŽǁ͘ ŽŶƐƚĂŶƚůLJ
ŵŽŶŝƚŽƌĨůƵŝĚƌĂƚĞƐƉƵŵƉĞĚŝŶĂŶĚĨůƵŝĚƌĞƚƵƌŶƐŽƵƚŽĨƚŚĞǁĞůů ͘&ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚ
ǁŚŝůĞĚĞƉůŽLJŝŶŐƉĞƌĨŐƵŶƐƚŽĞŶƐƵƌĞƚŚĞǁĞůůƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘
ͲϮϯ WĞƌĨ^ĐŚĞĚƵůĞ
WĞƌĨ/ŶƚĞƌǀĂů WĞƌĨ>ĞŶŐƚŚ 'ƵŶ>ĞŶŐƚŚ
tĞŝŐŚƚŽĨ
'ƵŶ;ůďƐͿ
ΕϱƉƉĨ
ϭϭ͕ϰϬϮ͛Ͳϭϭ͕ϱϬϮ͛ϭϬϬ͛ϭϬϬ͛ϱϬϬ ůďƐ
ϭϭ͕ϱϬϮ͛Ͳϭϭ͕ϱϮϮ͛ϮϬ͛>E<ϮϬ͛>E<ϭϬϬ ůďƐ
ϭϭ͕ϱϮϮ͛Ͳϭϭ͕ϲϰϮ͛ϭϮϬ͛ϭϮϬ͛ϲϬϬ ůďƐ
dŽƚĂů ϮϮϬ͛ϮϰϬ͛ϭϮϬϬ ůďƐ
ϭϱ͘ Z/,ǁŝƚŚƉĞƌĨŐƵŶĂŶĚƚŝĞͲŝŶƚŽĐŽŝůĨůĂŐ ĐŽƌƌĞůĂƚŝŽŶ ĂŶĚͬŽƌ /W͘ WŝĐŬƵƉĂŶĚƉĞƌĨŽƌĂƚĞŝŶƚĞƌǀĂů ƉĞƌWĞƌĨ
^ĐŚĞĚƵůĞĂďŽǀĞ͘
Ă͘ EŽƚĞĂŶLJƚƵďŝŶŐƉƌĞƐƐƵƌĞĐŚĂŶŐĞŝŶt^Z͘
ϭϲ͘ ĨƚĞƌƉĞƌĨŽƌĂƚŝŶŐ͕Wh,ƚŽƚŽƉŽĨůŝŶĞƌŽƌŝŶƚŽƚƵďŝŶŐƚĂŝůƚŽĞŶƐƵƌĞĚĞďƌŝƐĚŽĞƐŶ͛ƚĨĂůůŝŶŽŶƚŚĞŐƵŶƐĂŶĚ
ƐƚŝĐŬƚŚĞ,͘ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚĂŶĚƌĞͲŬŝůůŝĨŶĞĐĞƐƐĂƌLJďĞĨŽƌĞ ƉƵůůŝŶŐƚŽƐƵƌĨĂĐĞ͘
ϭϳ͘ WƵŵƉƉŝƉĞĚŝƐƉůĂĐĞŵĞŶƚǁŚŝůĞ WKK,͘ ^ƚŽƉĂƚƐƵƌĨĂĐĞƚŽƌĞĐŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘<ŝůůǁĞůůŝĨŶĞĐĞƐƐĂƌLJ͘
ϭϴ͘ ZĞǀŝĞǁǁĞůůĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐďƌĞĂŬĚŽǁŶ
ŽĨdWŐƵŶƐƚƌŝŶŐ͘
083&(PJU
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
ϭϵ͘ ŶƐƵƌĞƐĂĨĞƚLJ ũŽŝŶƚĂŶĚd/tǀĂůǀĞĂƐƐĞŵďůLJĂƌĞŽŶͲŚĂŶĚďĞĨŽƌĞďƌĞĂŬŝŶŐŽĨĨůƵďƌŝĐĂƚŽƌƚŽ>ŐƵŶ,͘
ϮϬ͘ ZDKdh͘
Ϯϭ͘ ZdWŽƌ&WǁĞůů͘
ƚƚĂĐŚŵĞŶƚƐ͗
ϭ͘ ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ
Ϯ͘ WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ
ϯ͘ ŽŝůdƵďŝŶŐKW^ĐŚĞŵĂƚŝĐ
ϰ͘ ^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ 'ƵŶĞƉůŽLJŵĞŶƚ
ϱ͘ ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ
ϲ͘ dŝĞ/Ŷ>ŽŐ
ϳ͘ ŚĂŶŐĞŽĨƉƉƌŽǀĞĚ^ƵŶĚƌLJ
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
ŽŝůĞĚdƵďŝŶŐKWƐ
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ
6WDQGLQJ 2UGHUVIRU6HUYLFH&RLOHG7XELQJ2SHUDWLRQV :KLOH'HSOR\LQJ([WHQGHG/HQJWK
3HUIRUDWLQJ%+$
:(//%(*,16)/2:,1*'85,1*23(1+2/('(3/2<0(17
3XOO%+$DERYH
EOLQGVKHDUUDPVDQG
FORVHEOLQGVKHDUV
6SDFHRXW %+$ZLWK
VDIHW\MRLQWDERYHVOLS
ERZOVHWKDQGVOLSV
,QVWDOOVDIHW\MRLQWZLWK
RSHQ 7,:
&DQ%+$EHSXOOHGDERYH
EOLQGVKHDU UDPVLQDVLQJOH
SLFN"
3XOOKDQGVOLSV
<(6 12
%HJLQ1RWLILFDWLRQV
&ORVH8SSHU3LSH6OLS
5DP
&ORVH 7,:
&ORVH FKRNH YDOYHVPRQLWRU
DQGUHFRUG6,:+3
&ORVH FKRNHOLQH
0RQLWRUDQGUHFRUG
6,:+3
/RZHUVDIHW\MRLQWDQG
VSDFHRXWRYHU %23VHW
KDQGVOLSV
%HJLQ1RWLILFDWLRQV
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
dŝĞͲ/Ŷ>ŽŐ
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
ϳͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ
džƚĞŶĚĞĚ ĚĚƉĞƌĨƐ
tĞůů͗ͲϮϯ
Wd͗ϮϭϯͲϭϲϭ
W/͗ ϱϬϬϮϵϮϬϳϳϱϬϰ
Changes to Approved Sundry Procedure
'DWH
6XEMHFW
6XQGU\
$Q\PRGLILFDWLRQVWRDQDSSURYHGVXQGU\ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ&KDQJHVWRDQDSSURYHG
VXQGU\ZLOOEHFRPPXQLFDWHGWRWKH$2*&&E\WKH³ILUVWFDOO´HQJLQHHU$2*&&ZULWWHQDSSURYDORIWKHFKDQJH
LVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH
6WHS 3DJH 'DWH 3URFHGXUH&KDQJH
+$.
3UHSDUHG
%\
,QLWLDOV
+$.
$SSURYH
G
%\
,QLWLDOV
$2*&&:ULWWHQ
$SSURYDO
5HFHLYHG
3HUVRQDQG
'DWH
$SSURYDO
2SHUDWLRQV0DQDJHU 'DWH
3UHSDUHG
2SHUDWLRQV(QJLQHHU 'DWH
2SHUDWRU1DPH
'HYHORSPHQW ([SORUDWRU\
6HUYLFH
5
3HUPLWWR'ULOO1XPEHU
358'+2(%$<358'+2(2,/
+LOFRUS1RUWK6ORSH//&
:HOO1DPHDQG1XPEHU
)LHOG3RROV
:HOO&ODVV%HIRUH:RUN
3UHVHQW:HOO&RQGLWLRQ6XPPDU\
7RWDO'HSWK PHDVXUHG IHHW
IHHW
3OXJV PHDVXUHG IHHW
IHHW
(IIHFWLYH'HSWK PHDVXUHG IHHW
IHHW
3DFNHU PHDVXUHG IHHW
IHHWWUXHYHUWLFDO WUXHYHUWLFDO
1RQH
&DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
/LQHU
/LQHU
3HUIRUDWLRQ'HSWK 0HDVXUHGGHSWK
IHHW
7UXHYHUWLFDOGHSWKIHHW
7XELQJVL]HJUDGHPHDVXUHGDQGWUXHYHUWLFDOGHSWK/
3DFNHUVDQG6669W\SHPHDVXUHGDQG
WUXHYHUWLFDOGHSWK
%DNHU63DFNHU
/LQHU
6WLPXODWLRQRUFHPHQWVTXHH]HVXPPDU\
,QWHUYDOVWUHDWHGPHDVXUHG
1$
2LO%EO *DV0FI :DWHU%EO &DVLQJ3UHVVXUH 7XELQJ3UHVVXUH
5HSUHVHQWDWLYH'DLO\$YHUDJH3URGXFWLRQRU,QMHFWLRQ'DWD
3ULRUWRZHOORSHUDWLRQ
6XEVHTXHQWWRRSHUDWLRQ
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH
&RQWDFW1DPH
&RQWDFW(PDLO
:\DWW5LYDUG
ZULYDUG#KLOFRUSFRP
$XWKRUL]HG1DPH6WDQ*ROLV
$XWKRUL]HG7LWOH
$XWKRUL]HG6LJQDWXUHZLWK'DWH&RQWDFW3KRQH
7UHDWPHQWGHVFULSWLRQVLQFOXGLQJYROXPHVXVHGDQGILQDOSUHVVXUH
6U$UHD2SHUDWLRQV0DQDJHU
2SHUDWLRQV3HUIRUPHG
$EDQGRQ 3OXJ3HUIRUDWLRQV 5 )UDFWXUH6WLPXODWH 3XOO7XELQJ
*6725 :,1- :$* *,1- 6863 63/8*
:HOO6WDWXVDIWHUZRUN2LO 5 *DV
([SORUDWRU\ 'HYHORSPHQW 5 6WUDWLJUDSKLF
:HOO&ODVVDIWHUZRUN
6HUYLFH
:'63/
$WWDFKPHQWVUHTXLUHGSHU$$&
'DLO\5HSRUWRI:HOO2SHUDWLRQV
&RSLHVRI/RJVDQG6XUYH\V5XQ
WUXHYHUWLFDO PHDVXUHG
6XQGU\1XPEHURU1$LI&2([HPSW
1R6669,QVWDOOHG
-XQN
3DFNHU
3ULQWHGDQG(OHFWURQLF)UDFWXUH6WLPXODWLRQ'DWD
5
([WHQGHG3HUIZ&78
2SHUDWLRQVVKXWGRZQ
&KDQJH$SSURYHG3URJUDP
5
1$
6HQLRU3HW(QJLQHHU6HQLRU5HV(QJLQHHU
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
5(32572)681'5<:(//23(5$7,216
6XVSHQG 53HUIRUDWH 2WKHU6WLPXODWH $OWHU&DVLQJ
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HSDLU:HOO 5HHQWHU6XVS:HOO
$GGUHVV &HQWHUSRLQW'U6XLWH
$QFKRUDJH$.
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU$'/ 3%8&'
/RJV/LVWORJVDQGVXEPLWHOHFWURQLFDQGSULQWHGGDWDSHU$$&
6WUDWLJUDSKLF
2WKHU
$3,1XPEHU
)RUP5HYLVHG 6XEPLW:LWKLQGD\VRI2SHUDWLRQV
[[
By Jody Colombie at 11:36 am, Mar 31, 2021
'LJLWDOO\VLJQHGE\6WDQ*ROLV
'1FQ 6WDQ*ROLV
RX 8VHUV
'DWH
6WDQ*ROLV
SFD 4/1/2021MGR01APR2021RBDMS HEW 3/31/2021
DSR-4/1/21
$&7,9,7<'$7(6800$5<
/56XQLW+HDWHG85RI.&/WR
&78&7
-RE6FRSH6HW&,%3DQGH[WHQGHGDGSHUI
0,58.LOOZHOO5,+Z+(6ORJJLQJ &,%3GULIW%+$/RJIURPIWWRIW
ZIODJDWIW32+
-RELQ3URJUHVV
&78&7
-RE6FRSH6HW&,%3DQGH[WHQGHGDGSHUI
&RQWLQXHWR32+ZLWKORJJLQJWRROV08 5,+Z&,%3/RDGZHOO6HW%DNHU
+XJKHV&,%3DW
3UHVVXUHWHVWHGSOXJWRSVL*RWKXQJXSDW
DQGSXOOHGIUHH322+SXPSLQJSLSHGLVSODFHPHQW'HSOR\HG
RI+(6
0D[IRUFHSHUIJXQV5,+ FRUUHFWGHSWK3HUIRUDWHZLWK+(6
0D[IRUFHVSI322+ NHHSZHOOIXOOZLWK.&/
-RELQ3URJUHVV
&78&7
-RE6FRSH6HW&,%3DQGH[WHQGHGDGSHUI
&RQWLQXHWR32+ZLWKSHUIJXQV/'SHUIJXQV)3ZHOO5'02
&RPSOHWHG
'DLO\5HSRUWRI:HOO2SHUDWLRQV
3%8&'
Operator Name:2.
Exploratory Development
Service
5
Permit to Drill Number:213-161
6.API Number:50-029-20775-04-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Field/Pools:9.
Well Name and Number:
ADL 028310 & 028305
Property Designation (Lease Number):10.
341 8.
PBU C-23D
7.If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception?
Stratigraphic
Current Well Class:4.
Type of Request:1.Abandon Plug Perforations 5 Fracture Stimulate Repair Well
Operations shutdown
Extended Perf w CTU
Op Shutdown
GAS
GSTOR WAG
SPLUG
Abandoned
Oil 5 WINJ
Exploratory Development 5Stratigraphic Service
WDSPL
12. Attachments:
PRESENT WELL CONDITION SUMMARY
13251
Effective Depth MD:
L80
11.
1/30/2021
Commission Representative:
15.
Suspended
Contact Name: Wyatt Rivard
Contact Email: wrivard@hilcorp.com
Authorized Name: Stan Golis
Authorized Title:Operations Manager
Authorized Signature:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Yes No Spacing Exception Required?Subsequent Form Required:
Approved by:COMMISSIONER
APPROVED BYTHE
COMMISSION Date:
5OtherAlter Casing
Pull Tubing
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
COMMISSION USE ONLY
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Detailed Operations Program
Packers and SSSV Type:
No SSSV Installed
Packers and SSSV MD (ft) and TVD (ft):
Perforation Depth MD (ft):Tubing Size:
Size
Total Depth MD (ft):Total Depth TVD(ft):
9021
Effective Depth TVD:Plugs (MD):Junk (MD):
Other Stimulate
Re-enter Susp Well
Suspend
Plug for Redrill
5Perforate
Perforate New Pool
9110, 8178
No SSSV Installed
Date:
Liner 3783 3-1/2" x 3-1/4" x 2-7/8"9367 - 13150 8422 - 9023 10160 10530
Well Status after proposed work:
16. Verbal Approval:
5
Change Approved Program
32 - 8580 32 - 7698
14. Estimated Date for Commencing Operations:
BOP Sketch
34 - 2694
Conductor
7240
Proposal Summary 13. Well Class after proposed work:
4-1/2" Baker S3 Packer
12730 - 13112 9026 - 9023 4-1/2" 12.6#30 - 9167
Liner
13115 9023 None None
34 - 2694 2670
9-5/8"
7"
Contact Phone:(907)777-8547
Date:
5410
2660 493013-3/8"Surface
4760
GINJ
5
Post Initial Injection MIT Req'd? Yes No
5
Comm.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
80 20"34 - 114 470
Intermediate 8548 6870
Liner 918 8426 - 9344 7575 - 8400
604 4-1/2" 9156 - 9760 8221 - 8777 8430 7500
Address:3800 Centerpoint Dr, Suite 1400,
Anchorage, AK 99503
3.
No 5Yes
Casing Length MD TVD Burst
1490
Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft):
Collapse
MPSP (psi):
Wellbore Schematic
2430
Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval.
34 - 114
By Samantha Carlisle at 9:55 am, Jan 19, 2021
321-036
Digitally signed by Stan Golis
DN: cn=Stan Golis,
ou=Users
Date: 2021.01.15 16:34:48 -
09'00'
Stan Golis
MGR19JAN21
X 10-404
DSR-1/19/21DLB 01/19/2021
Ytion Required?
Comm
1/20/21
dts 1/20/2021
JLC 1/20/2021
RBDMS HEW 1/27/2020
Plug and Add Perf
C-23D
PTD: 213-161
Well Name: C-23D CTU Plug & Add
Perf
API Number: 50-029-20775-04
Current Status: Producing Rig: CTU & Surface
Deployed TCP Guns
Estimated Start Date: 1/30/2021 Estimated Duration: 3 days
Reg.Approval Req’std? N/A Date Reg. Approval Rec’vd: N/A
Regulatory Contact: Abbie Barker Permit to Drill Number: 213-161
First Call Engineer: Wyatt Rivard (907) 777-8547 (O) (509) 670-8001 (M)
Second Call Engineer: Noel Nocas (907) 777-8449 (O) (907) 947-9533 (M)
AFE Number: IOR 296
Current Bottom Hole Pressure: 3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP)
Maximum Expected BHP: 3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP)
Max. Anticipated Surface Pressure: 2430psi (Based on 0.1 psi/ft. gas gradient)
Last SI WHP: 2400 psi (Taken on 11/30/2014)
Min ID: 2.377” XO at 13055’ MD
Max Angle: 98 Deg @ 12695’
Reference Log: BHI RPM Log Dated 12-10-2013
Brief Well Summary:
A 2013 natural flow sidetrack into Z2A, C-23D has 301’ of open toe perfs and flowed full time until mid 2020
when GOR became uneconomic. The well was recently cycled but did not cycle well and is ready for next stage
of perfs. The goal of this program is to move to next stage of perforations to return well to economic GOR.
Objective: Utilize CTU to isolate existing perforations then surface deploy TCP guns with CTU to add new perfs
and improve fluid rates.
Sundry Procedure (Approval Required to Proceed):
Note: The well will be killed and monitored before making up the initial perfs guns. This is generally done during
the drift/logging or plug set run. This will provide guidance as to whether the well will be killed by bullheading
or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be
killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the
firing head.
Coil Tubing
1. MIRU Coiled Tubing Unit and spot ancillary equipment.
2. MU GR/CCL and drift for 3-1/4” CIBP.
3. RIH below target CIBP set depth of ±12,670’ MD
4. Log up, stopping to paint flag.
5. POOH and confirm good data, obtain correction.
6. Bullhead ~220 bbls of 8.4 ppg 1% KCl or 8.5 ppg seawater down the tubing to the formation.
a. Wellbore volume = 9400’ X .0152bpf + .0079bpf x 3400’ = 170 bbls
7. Confirm well is dead. Freeze protect tubing as needed.
8. MU 3-1/4” CIBP. and RIH and correct to flag.
9. Contact OE Wyatt Rivard 1(509) 670-800 or Noel Nocas at 1(907) 947-9533 prior to setting
plug/perforating for final approval of tie-ins
10. Set plug mid-joint at ±12,670’ MD and test to 1500 psi. POOH.
Plug and Add Perf
C-23D
PTD: 213-161
11. At surface, prepare for deployment of TCP guns. Assure excess fluids available if needed to keep hole
full.
12. Confirm well is dead. Bleed any pressure off to returns tank. Kill well w/ 8.4 ppg 1% KCl or 8.5 ppg
seawater as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is
reestablished.
13. Pickup safety joint and TIW valve and space out before MU guns. Review well control steps with crew
prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety
joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the
working platform for quick deployment if necessary.
14. Break lubricator connection at QTS and begin makeup of TCP guns per Table 1: C-23D Proposed Ad-Perf
Gun Run below.
Gun
Run # Perf Top Perf Bottom Perf
Length
1 ±12144 ±12394 ±250
Total ±250
Table 1: C-23D Proposed Ad-Perf Gun Run
15. RIH and correlate to flag. Contact OE Wyatt Rivard 1(509) 670-8001 or Noel Nocas at 1(907) 947-9533
prior to perforating for final approval of tie ins.
16. Pickup and perforate intervals per Table 1: C-23D Proposed Ad-Perf Gun Run. POOH.
a. Note any tubing pressure change in WSR.
17. POOH. Stop at surface to reconfirm well dead and hole full.
18. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown
of TCP gun string.
19. RDMO CTU.
20. RTP or FP well.
Attachments:
1. As-built Schematic
2. Proposed Schematic
3. Coil Tubing BOPE Schematic
4. Equipment Layout Diagram
5. Standing Orders for Open Hole Well Control during Perf Gun Deployment
6. Tie In Log/Perf Sheet
Standing orders flow chart included with this sundry request.
*See note above regarding kill methods if pressure observed
on surface after perforating.
Plug and Add Perf
C-23D
PTD: 213-161
Wellbore Schematic
Plug and Add Perf
C-23D
PTD: 213-161
Proposed Schematic
Plug and Add Perf
C-23D
PTD: 213-161
Plug and Add Perf
C-23D
PTD: 213-161
Coiled Tubing BOPs
Plug and Add Perf
C-23D
PTD: 213-161
Equipment Layout Diagram
Plug and Add Perf
C-23D
PTD: 213-161
Standing Orders for Open Hole Well Control during Perf Gun Deployment
Plug and Add Perf
C-23D
PTD: 213-161
C-23D Tie-In Log
Plug and Add Perf
C-23D
PTD: 213-161
Plug and Add Perf
C-23D
PTD: 213-161
Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: January 15, 2021Subject: Changes to Approved Sundry Procedure for Well C-23DSundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the rig workover (RWO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date