Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-1637. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 02-18C Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-163 50-029-20454-03 12565 Conductor Surface Production Liner Liner 8779 80 2665 9980 278 2623 12565 20" 13-3/8" 9-5/8" 3-1/2" x 3-3/16" x 2-7/8" 2-3/8" 8779 32 - 112 32 - 2697 30 - 10010 9942 - 10220 9979 - 12602 32- 112 32 - 2697 30 - 8640 8525 - 8770 8558 - 8777 12565 520 2670 4760 10530 11780 none 1530 4930 6870 10160 11200 10390 - 12375 4-1/2" 12.6# 13CR-85 28 - 9899 8840 - 8794 Structural 4-1/2" HES TNT Perm , 4-1/2" Baker SAB Perm 8139 , 8543 9504 , 9962 8139 , 8543 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL0028308 28 - 8487 395 526 39693 35487 25 74 0 0 874 783 324-382 13b. Pools active after work:PRUDHOE OIL No SSSV 9504 , 9962 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:11 am, Oct 21, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.10.17 14:55:31 - 08'00' Bo York (1248) WCB 2-10-2025 DSR-10/23/24 RBDMS JSB 103124 ACTIVITYDATE SUMMARY 9/25/2024 LRS CTU #1 - 1.50" Blue Coil Job Objective: Extended Addperf MIRU CTU. Begin weekly BOP test. ...Continued on WSR 9-26-24... 9/26/2024 LRS CTU #1 - 1.50" Blue Coil ***Cont. from WSR 9-25-24*** Job Objective: Extended AddPerf Complete weekly BOP test. Make up drift BHA with 1.75" DJN and RIH. Load well with slick seawater to load and sweep gas. Drift down to 12,500' CTMD. POOH. LD drift BHA, M/U NS CTC/MHA and HES GR/CCL. RIH. Log from 11,500-9500. POOH loading well with slick seawater. No flow well at surface, pop off and L/D logging tools. -4' correction. Failed CTC on PT. M/U new NS CTC/MHA and PT. Perform well control drill, deploy 214' HES 1.56" millennium guns. RIH. Tie-in to flag and perforate 10390'-10604'. POOH while maintaining hole fill. Lay down perf guns with all shots fired. Freeze protect tubing with diesel. Begin rig down CTU. ...Continued on WSR 9-27-24... 9/27/2024 LRS CTU #1 - 1.50" Blue Coil ***Cont. from WSR 9-26-24*** Job Objective: Extended AddPerf Rig down CTU. ***Job Complete**** Daily Report of Well Operations PBU 02-18C gg g Perform well control drill, deploy 214' HES 1.56" millennium guns. RIH. Tie-in to flag and perforateyg 10390'-10604'. POOH while maintaining hole fill. 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 02-18C Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-163 50-029-20454-03 ADL0028308 12565 Conductor Surface Production Liner Liner 8779 80 2665 9980 278 2623 12565 20" 13-3/8" 9-5/8" 3-1/2" x 3-3/16" x 2-7/8" 2-3/8" 8779 32 - 112 32 - 2697 30 - 10010 9942 - 10220 9979 - 12602 2420 32- 112 32 - 2697 30 - 8640 8525 - 8770 8558 - 8777 12565 520 2670 4760 10530 11780 none 1530 4930 6870 10160 11200 10640 - 12375 4-1/2" 12.6# 13CR-85 28 - 98998839 - 8794 Structural 4-1/2" HES TNT Perm , 4-1/2" Baker SAB Perm No SSSV 9504 , 9962 8139 , 8543 Date: Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY 7/18/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 12:35 pm, Jul 02, 2024 Digitally signed by Eric Dickerman (4002) DN: cn=Eric Dickerman (4002) Date: 2024.07.02 12:15:33 - 08'00' Eric Dickerman (4002) 324-382 10-404 DSR-7/8/24 MGR02JUL24 A.Dewhurst 08JUL24*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.07.09 12:16:51 -08'00'07/09/24 RBDMS JSB 070924 (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ ®ôīīϙbÍıôϡ ͏͑ϱ͐͗ϙîîϙ„ôŘċ „IϙbŪıæôŘϡ ͔͏ϱ͏͑͘ϱ͑͏͓͔͓ϱ͏͒ ŪŘŘôIJťϙ‹ťÍťŪŜϡ iƯīĖIJôϙ˜IJèĺıŕôťĖťĖŽô ‡ĖČϡ “˜ (ŜťĖıÍťôîϙ‹ťÍŘť "Íťôϡ ͏͖ϯ͐͗ϯ͑͏͓͑(ŜťĖıÍťôîϙ"ŪŘÍťĖĺIJϡ ͑îÍƅŜ ‡ôČŪīÍťĺŘƅ ĺIJťÍèťϡ ÍŘŘĖôϙVÍIJĺſŜħĖ „ôŘıĖťϙťĺϙ"ŘĖīīϙbŪıæôŘϡ ͕͑͐͒͐͒ >ĖŘŜťϙÍīīϙ(IJČĖIJôôŘϡ aÍƄϙ"ĖèħôŘıÍIJ ϼ͒͏͖Ͻϙ͔͑͏ϱ͖͗͗͑ ϼèϽ ‹ôèĺIJîϙÍīī (IJČĖIJôôŘϡ "ÍŽĖîϙĤĺŘħ ϼ͘͏͖Ͻ͓͓͏ϱ͏͒͒͐ϙϼèϽ >(ϙbŪıæôŘϡ ͓͑͑ϱ͏͓͐͑͘Ii‡͔͏ ŪŘŘôIJťϙĺťťĺıϙFĺīôϙ„ŘôŜŜŪŘôϡ ͒Ϡ͒͏͏ ŕŜĖϙЬϙ͗Ϡ͗͏͏Ѝϙ“«"͖ϟ͒ „„@( aÍƄϟϙIJťĖèĖŕÍťôîϙ‹ŪŘċÍèô„ŘôŜŜŪŘôϡ ͑Ϡ͓͑͏ŕŜĖ ϼÍŜôîϙĺIJϙ͏ϟ͐ϙŕŜĖϯċťϟϙČÍŜϙČŘÍîĖôIJťϽ [ÍŜťϙ‹Iϙ®F„ϡ ͓͑͐͏ ŕŜĖ ϼ“ÍħôIJϙĺIJ ͏͗ϯ͒͐ϯ͑͒ ĺĖīϽ aĖIJϙI"ϡ ͐ϟ͖͗ЋϙI"ϳīŪıĖIJŪıϙŪŜēĖIJČϙĖIJϙ"ôŕīĺƅϙ‹[«ϙ͘͘͘͏Ѝa" aÍƄϙIJČīôϡ ͖͘"ôČϙЬϙ͐͑Ϡ͓͘͏Ѝ ‡ôċôŘôIJèôϙ[ĺČϡ „³ϙ„"[ [ĺČϙ"Íťôî ͒ϱVŪIJϱ͑͏͓͐ ŘĖôċϙ®ôīīϙ‹ŪııÍŘƅϡ ͏͑ϱ͐͗ϙĖŜϙÍϙ“‹ϙťēÍťϙèÍıôϙĺIJīĖIJôϙĖIJϙaÍƅϙĺċϙ͑͏͓͐ϙÍťϙ͖͖͒͐ϙæŕîϠϙ͒ϙæſŕîϠϙÍIJîϙ͐͐ϙııŜèċîϟϙϙI„ϙſÍŜ ŜôťϙÍťϙ͐͐Ϡ͓͔͘ЍϙĖIJϙ>ôæŘŪÍŘƅϙĺċϙ͑͏͕͐ϙťĺϙĖŜĺīÍťôϙČÍŜϙŘĖèēϙŕôŘċŜϙĖIJϙťēôϙťĺôϙĺċϙťēôϙſôīīϟ ‹ĖIJèôϙ͑͏͕͐Ϡ ťēô ſôīīЍŜϙ@i‡ϙēÍŜϙèĺIJťĖIJŪôîϙťĺ ŘĖŜôϠÍIJîϙĖťϙēÍŜϙæôôIJϙèīĺŜôϙťĺϙťēôϙıÍŘČĖIJÍīϙ@i‡ϙŜĖIJèôϙ"ôèôıæôŘϙĺċ ͑͏͐͘ϟϙ“ēôI„ ŜôťϙĖIJϙ͑͏͕͐ϠſÍŜıĖīīôîϙĖIJϙ‹ôŕťôıæôŘϙĺċϙ͑͏͑͒ ťĺèÍŕťŪŘôϙƲŪŜēϙŕŘĺîŪèťĖĺIJϟϙ“ēĺŪČē ĺIJèôϙťēôϙſôīī æôČÍIJϙťĺϙŕŘĺîŪèôϙťĺĺϙıŪèēϙČÍŜϠ ĖťϙſÍŜϙŜēŪťϙĖIJŕŘĖī ĺċťēĖŜϙƅôÍŘϟ iæĤôèťĖŽôŜϡ “ēôϙĺæĤôèťĖŽôϙĺċϙťēĖŜϙŕŘĺèôîŪŘôϙĖŜϙťĺϙŜēĺĺť ôƄťôIJîôî ŕôŘċĺŘÍťĖĺIJŜ ϼĺIJôϙŘŪIJϢ͓͑͐ЍϙĺċϙČŪIJŜϽϙťĺϙıÍħô ťēôϙſôīīϙèĺıŕôťĖťĖŽôϙÍČÍĖIJϟ „ŘĺèôîŪŘôϡ ĺĖīôîϙ“ŪæĖIJČ bĺťôŜϧ x ‡ôıĺťôϟ ČÍŜϟ ıĺIJĖťĺŘĖIJČϟ ċĺŘϟ F͗‹ϟ ÍIJîϟ [([Ŝϟ ÍŘôϟ ŘôŗŪĖŘôîϟ ċĺŘϟ iŕôIJ Fĺīôϟ "ôŕīĺƅıôIJť iŕôŘÍťĖĺIJŜ x "ŪôϟťĺϟťēôϟIJôèôŜŜÍŘƅϟĺŕôIJϟēĺīôϟîôŕīĺƅıôIJťϟĺċϟ(ƄťôIJîôîϟ„ôŘċĺŘÍťĖIJČϟĤĺæŜϦϟ͙͗ϷēĺŪŘϟèŘôſ ÍIJîϟ®‹‹ϟèĺŽôŘÍČôϟĖŜϟŘôŗŪĖŘôîϥ x “ēôϟſôīīϟſĖīīϟæôϟħĖīīôîϟÍIJîϟıĺIJĖťĺŘôîϟæôċĺŘôϟıÍħĖIJČϟŪŕϟťēôϟĖIJĖťĖÍīϟŕôŘċŜϟČŪIJŜϥϟϟ“ēĖŜϟĖŜ ČôIJôŘÍīīƅϟîĺIJôϟîŪŘĖIJČϟťēôϟîŘĖċťϵīĺČČĖIJČϟŘŪIJϥ “ēĖŜϟſĖīīϟŕŘĺŽĖîôϟČ ŪĖîÍIJèôϟÍŜϟťĺϟſēôťēôŘϟťēô ſôīīϟſĖīīϟæôϟħĖīīôîϟæƅϟæŪīīēôÍîĖIJČϟĺŘϟèĖŘèŪīÍťĖIJČϟæĺťťĺıŜϟŪŕϟťēŘĺŪČēĺŪťϟťēôϟĤĺæϥ IċϟŕŘôŜŜŪŘô ĖŜϟŜôôIJϟĖııôîĖÍťôīƅϟÍċťôŘϟŕôŘċĺŘÍťĖIJČϦϟĖťϟſĖīīϟôĖťēôŘϟæôϟħĖīīôî ϟæƅϟæŪīīēôÍîĖIJČϟſēĖīôϟ„iiFϟĺŘ èĖŘèŪīÍťĖIJČϟæĺťťĺıŜϟŪŕϟťēŘĺŪČēϟťēôϟŜÍıôϟŕĺŘťϟťēÍťϟĺŕôIJôîϟťĺϟŜēô ÍŘϟťēôϟƱŘĖIJČϟēôÍîϥ ͐ϟ ċťôŘϙa˜ϙaFϙÍIJîϙŕŪīīϙťôŜťĖIJČϙťēôϙ“ϠϙťÍČϱŪŕϙĺIJϙťēôϙ“ϙŜťŘĖŕŕôŘϙťĺϙôIJŜŪŘôϙFϙèÍIJIJĺť ŕŪīīϙťēŘĺŪČēϙťēôϙæŘÍŜŜϙŪŕĺIJϙ„iiFϙſĖťēϙČŪIJŜϟ (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ ͑ϟ ŪīīēôÍîϙѹ͐͘͏ ææīŜ ͐҇ϙX[ϯ‹®ϙîĺſIJϙťŪæĖIJČϟϙϙaÍƄϙťŪæĖIJČϙŕŘôŜŜŪŘôϙ͔͑͏͏ϙŕŜĖϟϙϙϼ“ēĖŜϙŜťôŕ èÍIJϙæôϙŕôŘċĺŘıôîϙÍIJƅϙťĖıôϙŕŘĖĺŘϙťĺϙĺŕôIJϱēĺīôϙîôŕīĺƅıôIJťϙĺċϙťēôϙŕôŘċϙČŪIJŜϟϙϙ“ĖıĖIJČϙĺċϙťēô ſôīīϙħĖīīϙĖŜϙÍťϙťēôϙîĖŜèŘôťĖĺIJϙĺċϙťēôϙ®‹‹ϟϽ Íϟ ®ôīīæĺŘôϙŽĺīŪıôϙťĺϙťĺŕϙŕôŘċϙѱ͔͓͐ ææīŜ æϟ ͓ϱ͐ϯ͑Ћϙ“ŪæĖIJČϳ͓͑͘͘Ѝϙ³ϙ͏ϟ͏͔͐͑ϙѱϙ͔͐͐ ææī èϟ ͒ϱ͐ϯ͑Ћϙ[ĖIJôŘϳ͒͐Ѝϙ³ϙϟ͏͏͖͗æŕċϙѱ ͏ϟ͒ææī îϟ ͑ϱ͒ϯ͗Ћϙ[ĖIJôŘϳ͕͕͕Ѝϙ³ϙϟ͏͏͖͘æŕċϙѱ͑ϟ͕ææīŜ ͒ϟ "ŘĖċťϙťĺϙ„“"ϙſĖťēϙIJĺƏƏīôϙċĺŘϙīĺČČĖIJČϙťĺĺīŜϟ ͓ϟ a˜ϙÍIJîϙ‡IFϙſĖťēϙīĺČČĖIJČϙťĺĺīŜϙÍIJîϙîŘĖċťϙFϟ ͔ϟ >īÍČϙŕĖŕôϙÍŜϙÍŕŕŘĺŕŘĖÍťôϙŕôŘϙ®‹‹ϙċĺŘϙÍîŕôŘċϟ ͕ϟ „iiFϙÍIJîϙċŘôôƏôϙŕŘĺťôèťϙťŪæĖIJČϙÍŜϙIJôôîôîϟ ͖ϟ ĺIJƱŘıϙČĺĺîϙīĺČϙîÍťÍϟ ͗ϟ ťϙŜŪŘċÍèôϠϙŕŘôŕÍŘôϙċĺŘϙîôŕīĺƅıôIJťϙĺċϙ“„ϙČŪIJŜϟ ͘ϟ ĺIJƱŘıϙſôīīϙĖŜϙîôÍîϟϙīôôîϙÍIJƅϙŕŘôŜŜŪŘôϙĺƯϙťĺϙŘôťŪŘIJϙťÍIJħϟϙϙXĖīīϙſôīīϙſϯ X®>Ϡϙ͗ϟ͓ϙŕŕČϙ͐҇ Xīϙ ĺŘϙ ͗ϟ͔ϙ ŕŕČ ÍŜϙ IJôôîôîϟ aÍĖIJťÍĖIJϙ ēĺīôϙ Ʊīīϙ ťÍħĖIJČϙ ŘôťŪŘIJŜϙ ťĺϙ ťÍIJħϙ ŪIJťĖīϙ īŪæŘĖèÍťĺŘ èĺIJIJôèťĖĺIJϙĖŜϙŘôϱôŜťÍæīĖŜēôîϟ >īŪĖîŜϙıÍIJϱſÍťèēϙıŪŜťϙæôϙŕôŘċĺŘıôîϙſēĖīôϙîôŕīĺƅĖIJČϙŕôŘċ ČŪIJŜϙťĺϙôIJŜŪŘôϙťēôϙſôīīϙŘôıÍĖIJŜϙħĖīīôîϙÍIJîϙťēôŘôϙĖŜϙIJĺϙôƄèôŜŜϙƲĺſϟ ϰ„ôŘċĺŘıϟîŘĖīīϟæƅϟŕĖèħĖIJČϟŪŕϟŜÍċôťƅϟĤĺĖIJťϟſĖťēϟ“I®ϟŽÍīŽôϟÍIJîϟŜŕ Íèô ĺŪťϟæôċĺŘôϟa˜ϟČŪIJŜϥ ‡ôŽĖôſϟſôīīϟèĺIJťŘĺīϟŜťôŕŜϟſĖťēϟèŘôſϟŕŘĖĺŘϟťĺϟæŘôÍħĖIJČϟīŪæŘĖèÍťĺŘϟèĺIJIJôèťĖĺIJϟÍIJî èĺııôIJèĖIJČϟıÍħôŪŕϟĺċϟ“„ϟČŪIJϟŜťŘĖIJČϥϟϟiIJèôϟťēôϟŜÍċôťƅϟĤĺĖIJťϟÍIJî ϟ“I®ϟŽÍīŽôϟēÍŽôϟæôôIJ ŜŕÍèôî ĺŪťϦϟħôôŕϟťēôϟŜÍċôťƅϟĤĺĖIJťϵ“I®ϟŽÍīŽôϟŘôÍîĖīƅϟÍèèôŜŜĖæīôϟIJ ôÍŘϟťēôϟſĺŘħĖIJČϟŕīÍťċĺŘıϟċĺŘ ŗŪĖèħϟîôŕīĺƅıôIJťϟĖċϟIJôèôŜŜÍŘƅϥ Íϥ ťϟťēôϟæôČĖIJIJĖIJČϟĺċϟôÍèēϟĤĺæϦϟťēôϟèŘĺŜŜĺŽôŘϵŜÍċôťƅϟĤĺĖIJťϟıŪŜťϟæ ôϟŕēƅŜĖèÍīīƅϟa˜ϟťĺϟťēô ŕôŘċϟČŪIJŜϟĺIJôϟťĖıôϟťĺϟèĺIJƱŘıϟťēôϟťēŘôÍîŜϟÍŘôϟèĺıŕÍťĖæīôϥ ͖͕ϥ ŘôÍħϙīŪæŘĖèÍťĺŘϙèĺIJIJôèťĖĺIJϙÍťϙ†“‹ϙÍIJîϙæôČĖIJ ıÍħôŪŕϙĺċϙ“„ϙČŪIJŜϙŕôŘϙŜèēôîŪīôϙæôīĺſϟ ĺIJŜťÍIJťīƅϙıĺIJĖťĺŘϙƲŪĖîϙŘÍťôŜϙŕŪıŕôîϙĖIJϙÍIJîϙƲŪĖîϙŘôťŪŘIJŜϙĺŪťϙĺċϙťēôϙſôīīϟϙϙ>īŪĖîŜϙıÍIJϱ ſÍťèēϙıŪŜťϙæôϙŕôŘċĺŘıôîϙſēĖīôϙîôŕīĺƅĖIJČϙŕôŘċϙČŪIJŜϙťĺϙôIJŜŪŘôϙťēôϙſôīīϙŘôıÍĖIJŜϙħĖīīôîϙÍIJî ťēôŘôϙĖŜϙIJĺϙôƄèôŜŜϙƲĺſϟ „ôŘċϙ‹èēôîŪīô ϰ͖ϥ͚͛ГГaĖīīôIJIJĖŪıČŪIJŜϟſôŘôϟŪŜôîϟťĺϟôŜťĖıÍťôϟċĺŘϟťēĖŜϟĤĺæϟÍIJîϟèÍīèŪīÍťôϟČŪIJϟſôĖČēťŜϥ „ôŘċϙIIJťôŘŽÍī „ôŘċϙ[ôIJČťē @ŪIJϙ[ôIJČťē ®ôĖČēťϙĺċ @ŪIJϙϼīæŜϽ ͐͏Ϡ͒͘͏Ѝϳ͐͏͕͏͓Ѝ ͓͑͐Ѝ ͓͑͐Ѝ ͖͖͔ īæŜ ϼ͒ϟ͕͑ŕŕċϽ “ĺťÍī ͓͑͐Ѝ ͓͑͐Ѝ ͖͖͔ īæŜ ͐͐ϟ ‡IFϙſĖťēϙŕôŘċϙČŪIJϙÍIJîϙťĖôϱĖIJϙťĺϙèĺĖīϙƲÍČϙèĺŘŘôīÍťĖĺIJϟϙϙ„ĖèħŪŕϙÍIJîϙŕôŘċĺŘÍťôϙĖIJťôŘŽÍīϙŕôŘϙ„ôŘċ ‹èēôîŪīôϙÍæĺŽôϟ Íϟ bĺťôϙÍIJƅϙťŪæĖIJČϙŕŘôŜŜŪŘôϙèēÍIJČôϙĖIJϙ®‹‡ϟ * Make up PCE and test QTS. -mgr (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ æϟ bĺťôϙťēôϙ„"[ϙŪŜôîϙċĺŘϙťēôϙťĖôϱĖIJϙīĺČϙîĺôŜϙIJĺťϙēÍŽôϙ[ϙĺIJϙĖťϟ èèĺŘîĖIJČϙťĺϙ@ôĺϳîĺ IJĺťϙēÍŽôϙťĺϙæôϙťĺĺϙŕŘôèĖŜôϙĺIJϙŕôŘċϙĖIJťôŘŽÍīϙťēĺŪČēϙîĺϙIJĺťϙſÍIJťϙ ťĺϙŕôŘċĺŘÍťôϙťĺĺ ıŪèēϙċÍŘťēôŘϙŪŕϱēĺīôϟ ͐͑ϟ ċťôŘϙŕôŘċĺŘÍťĖIJČϠϙ„˜FϙťĺϙťĺŕϙĺċϙīĖIJôŘϙĺŘϙĖIJťĺϙťŪæĖIJČϙťÍĖīϙťĺϙôIJŜŪŘôϙîôæŘĖŜϙîĺôŜIJЍťϙċÍīīϙĖIJϙĺIJϙťēô ČŪIJŜϙÍIJîϙŜťĖèħϙťēôϙFϟϙϙĺIJƱŘıϙſôīīϙĖŜϙîôÍîϙÍIJîϙŘôϱħĖīīϙĖċ IJôèôŜŜÍŘƅϠ æôċĺŘôϙŕŪīīĖIJČϙťĺ ŜŪŘċÍèôϟ ͐͒ϟ „ŪıŕϙŕĖŕôϙîĖŜŕīÍèôıôIJťϙſēĖīôϙ„iiFϟϙϙ‹ťĺŕϙÍťϙŜŪŘċÍèôϙťĺϙŘôèĺIJƱŘıϙſôīīϙĖŜϙîôÍîϟϙϙXĖīīϙſôīīϙĖċ IJôèôŜŜÍŘƅϟ ͓͐ϟ ‡ôŽĖôſϙ ſôīīϙ èĺIJťŘĺīϙ ŜťôŕŜϙ ÍIJîϙ ‹ťÍIJîĖIJČϙ iŘîôŘŜϙ ſĖťēϙ èŘôſϙ ŕŘĖĺŘϙ ťĺϙ æŘôÍħĖIJČϙ īŪæŘĖèÍťĺŘ èĺIJIJôèťĖĺIJϙÍIJîϙèĺııôIJèĖIJČϙæŘôÍħîĺſIJϙĺċϙ“„ϙČŪIJϙŜťŘĖIJČϟ Íϟ (IJŜŪŘôϙŜÍċôťƅϙĤĺĖIJťϙÍIJîϙ“I®ϙŽÍīŽôϙÍŜŜôıæīƅϙÍŘôϙĺIJϱēÍIJîϙæôċĺŘôϙæŘôÍħĖIJČϙĺƯϙīŪæŘĖèÍťĺŘ ťĺϙ["ϙČŪIJϙFϟ ͔͐ϟ ‡"aiϙ“˜ϟ ͕͐ϟ ‡“„ϙĺŘϙ>„ϙſôīīϟ ťťÍèēıôIJťŜϡ ͐ϟ ŪŘŘôIJťϙ®ôīīæĺŘôϙ‹èēôıÍťĖè ͑ϟ „ŘĺŕĺŜôîϙ‹èēôıÍťĖè ͒ϟ ĺĖīϙ“ŪæĖIJČϙi„(ϙ‹èēôıÍťĖè ͓ϟ ‹ťÍIJîĖIJČϙiŘîôŘŜϙċĺŘiŕôIJϙFĺīôϙ®ôīīϙĺIJťŘĺīϙîŪŘĖIJČϙ„ôŘċϙ@ŪIJϙ"ôŕīĺƅıôIJť ͔ϟ (ŗŪĖŕıôIJťϙ[ÍƅĺŪťϙ"ĖÍČŘÍı ͕ϟ “ĖôϙIIJϙ[ĺČϯ„ôŘċϙ‹ēôôť ͖ϟ ‹ŪIJîŘƅϙèēÍIJČôϙċĺŘı 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 02-18C Milled CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-163 50-029-20454-03 12565 Conductor Surface Production Liner Liner 8779 80 2665 9980 278 2623 12565 20" 13-3/8" 9-5/8" 3-1/2" x 3-3/16" x 2-7/8" 2-3/8" 8779 32 - 112 32 - 2697 30 - 10010 9942 - 10220 9979 - 12602 32- 112 32 - 2697 30 - 8640 8525 - 8770 8558 - 8777 12565 520 2670 4760 10530 11780 none 1530 4930 6870 10160 11200 10640 - 12375 4-1/2" 12.6# 13CR-85 28 - 9899 8839 - 8794 Structural 4-1/2" HES TNT Perm , 9506 , 8139 No SSSV 9506 8139 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL0028308 28 - 8487 383 868 39775 34223 23 99 0 0 848 356 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:04 am, Sep 13, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.09.13 09:41:57 -08'00' RBDMS JSB 091423 DSR-9/15/23WCB 3-13-2024 ACTIVITYDATE SUMMARY 8/31/2023 LRS CTU 1 1.5" Blue Coil, Job Objective: Mill CIBP MIRU. Function tested BOPs. Make up 1.75" JSN BHA and RIH to 4000' to test unit functionality post hydraulic oil cooler repair. Bullhead 120 bbls 1% Slick + SL & 10 bbls 60/40 down CTBS. POOH to diagnose hydraulic system issue - could not get it to repeat at atmosphere. MU & RIH 1.69" motor and 1.75" Venturi/BS. Park at 4265' for LRS mechanic to diagnose hydraulic system while under pressure. POOH. At surface, mechanic repair hydraulic system. RBIH w/ 1.69" motor and 1.75" Venturi/BS. At 4000' - no issues w/ hydraulic system. Continue RIH to mill plug. Conduct well control drills and AAR with both crews. Tag CIBP at 11935CTM and mill through. Pushed to 12065' and stopped making progress. Overpulled in that area. Got pipe free. POOH for junk mill. Recovered multiple pieces of CIBP. Make up 1.75" 4-blade junk mill. ***Job Continued on 9/1/2023*** 9/1/2023 LRS CTU 1 1.5" Blue Coil, Job Objective: Mill CIBP Make up 1.75" 4-blade junk mill. Tagged high at 11444 and begin working plug debris down. Pushed CIBP down to 12544 CTMD. POOH. Freeze Protect well with 38 bbls 60/40. RDMO. ***Job Complete*** Daily Report of Well Operations PBU 02-18C j Make up 1.75" 4-blade junk mill. Tagged high at 11444 and begin working plugjggg debris down. Pushed CIBP down to 12544 CTMD. POOH LRS CTU 1 1.5" Blue Coil, Job Objective: Mill CIBP g Tag CIBP at 11935CTM andg mill through. Pushed to 12065' and stopped making progress (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ ŪŘŘôIJťϙ®ôīīæĺŘôϙ‹èēôıÍťĖè (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ „ŘĺŕĺŜôîϙ®ôīīæĺŘôϙ‹èēôıÍťĖè ͐ϟ͔͕ЍЍ ͕ ͐͏Ϡ͒͘͏Ѝ ϳ ͐͏Ϡ͕͏͓Ѝ i ͏͖ϯ͐͗ϯ͓͑ (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ ĺĖīôîϙ“ŪæĖIJČϙi„Ŝ (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ ‹ťÍIJîĖIJČϙiŘîôŘŜϙċĺŘϙiŕôIJϙFĺīôϙ®ôīīϙĺIJťŘĺīϙîŪŘĖIJČϙ„ôŘċϙ@ŪIJϙ"ôŕīĺƅıôIJť (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ (ŗŪĖŕıôIJťϙ[ÍƅĺŪťϙ"ĖÍČŘÍı (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ Tie In: PDCL Log 3-JUN-2014 (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ îŕôŘċ ͐͏Ϡ͒͘͏Ѝϱ ͐͏͕͏͓Ѝ (ƄťôIJîôîϙ„ôŘċϙ„ŘĺèôîŪŘô ͏͑ϱ͐͗ „“"ϡϙ͑͐͒ϱ͕͐͒ Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date STATE OF ALASKA • •LASKA OIL AND GAS CONSERVATION COMMI REPORT OF SUNDRY WELL OPERATII 1. Operations Performed Abandon ❑ Plug Perforations WI Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown 0 Suspend 0 Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Repair Well 0 Re-enter Susp Well ❑ Other: ,j'{f C/BJH n 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 213-163 3. Address: P.O.Box 196612 Anchorage, Development Exploratory ID AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20454-03-00 7. Property Designation(Lease Number): ADL 0028308 8. Well Name and Number: PBU 02-18C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: ,,,•._ I /E Total Depth: measured 12602 feet Plugs measured 11945 feet true vertical 8777 feet Junk measured feet MAR 21 201E Effective Depth: measured 11945 feet Packer measured See Attachment feet true vertical 8803 feet Packer true vertical See Attachment feet AOG cc. Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"94#H-40 32-112 32-112 1530 520 Surface 2670 13-3/8"72#N-80 32-2702 32-2702 4930 2670 Intermediate Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10640 10970 feet 11080-11240 feet 11280-11460 feet 11630-11875 feet 11975-12100 feet 12200-12375 feet True vertical depth: 8839-8827 feet feet 8822-8817 feet 8816-8806 feet 8800-8802 feet 8804-8808 feet 8805-8794 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): same APR 2 1201E Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 450 36567 33 360 912 Subsequent to operation: Shut-In 1200 824 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations p Exploratory ❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP 0 SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature r J L.—[".l. Phone +1 907 564 4424 Date 3/16/16 Form 10-404 Revised 5/2015 I L. 4`I2 I 1 L Submit Original Only €41z-.6 RBDMS v/ MAR z 2 2016 • • • Packers and SSV's Attachment PBU 02-18C SW Name Type MD TVD Depscription 02-18C TBG PACKER 9504.44 8138.56 4-1/2" HES TNT Perm Packer 02-18C TBG PACKER 9962.23 8542.81 4-1/2" Baker SAB Perm Packer 02-18C PACKER 9968.99 8548.82 35 KB LTP • S O O O O mc O O O O M M O O O M OM M r O r r 0 U y 0 0 0 0 000 M O O I- M M N- 11) N- M O M N M 7 IC) d) M r r N O Nr O o M r r r r N r` N Lo r r- N O O CO ,rr N- t` t O O d' N- N- M M If) N- M M d' CO N r` M M M M M M M M l , , i H M N N O M N- N M t• N' M M M M M N- NLO M M M N I[) M M M M MM CD C M O N t• L M O M d m O M O N M O Nt M O M N O O N O O r O N O N O O r r r r r r CtS U 2 1 1 1 1 I 1 I 1 I 1 Q 00LONNOV M O N N O M M N r` O M M M M O m O O O O N O C N m m m m m O • m c) \ a C) 0o) aaacoa 0 � O M MMM M 0 a) 1- Z J 6 J J J M J C O r d = N tLo M N• $ M •O O M OO N M 00 CV N M ao r M = r O N M N m O N- M N MO ct N N M M M M d M N O) r M N 0 O -J Z Z 00 00 c H W H H '60000 MDDD O O u O O fYZ Z ZCCOOWWWWWEE OZZZZZ 0 (n O J J J J J H H • • k u / Ec \ $/ 3 -I $ I / I0 12 ? E \ \ f 0 %0 / o / i;."-) c o . N \ E\ ® = = r ± o / o 0 o .- I— E � / �.c $ » o * kEtf 2 ± _ -J m $ <03 L. 7 / et 0 / � � >, � R O0. U / \ - k / C \ — co 2 as $ ± CD 7 \ 2 k- Cl) 0 2 g o % _ oCO t cow777i e R co i < a co C co d \ \I / d k ■ 0 9 e / I G _ 9 a \ ± > 7 cn > CL Ce c\I \ > i \ $ \ / _ CO > i CN \ f \ ctl \ Q ± / O 2 7 / G + f / O E o / \ m m - o m : m \ c \ E .7- E \ $ \ E / \ / / F ' o - e G o b o ± c - _m \ \ / Sk2 / S / ECD / \ \ �\ / \ / k / k0 \ a / .2 / a j 2r'sJ % p / 7 \ \ a j E 2 f = » Ut = » 7 ° + ®iii ? OO = » - D E / 2y # o ® f f o m E2 # \ C O = Cl) o D _a- / / / o / / co- / / / / _a/ R \ / / / / U O 2 ; U O t U w e U ; c ,- O O t cC t co e o 3 2 < e co e \ N N N ® nw ® o » = d / / \ r \ & & C. < 4-11160W -•D= GRAY • 02-1 /3C Sit NOTES: WELL ANGLE>-70°@ 10320'. °•• OM E TBG"' 'PREVIOUS W ELLBORE ON ACTUATOR= BAKER C OKB.= 64 -- ) I i 2489 PAC,E. 2*HM4A:11.2. DFESLS 7:31a:5°073.180133:1 '. REF B_B/- 64' BF.B_EV= 3372' 20"CONDUCTOR, - 80' I<OP= 310a 94#,14-40 GAS LFT MA MDRE.S Mu Angle= 97"@1249(7 1)=19.124" ST MD WD DEV TY PE VLV LATCH PORT DATE Datum MD= NA 4 3722 3679 27 WA3 DOW RK 16 05/05/14 Datum TVD= 880(Y SS 3 6416 5800 41 MNG SO RK 20 05/05/14 2 8404 7270 43 WAG DMY RK 0 01/07/14 13-318"CSG,72#,N-80 BUTT,k)" 12.347" - 269T I >< 1 9356 8009 31 MMG DAY RK 0 01/07/14 9-518"CSG,47#,L-80 XO TO S00-95 BTC - 9060' Minimum ID = 1.78" @ -9990' II 9476" -4-112 FES X NP,13=3.813" 9506' -19-5/8"X 4-1/2"11E..)TNT PKR,ID=3.903' ALUMINUM BUSHING IN DEPLOY SLV mill 9-5/8"x 4-1/2"WS VVEDGE,ID=3.958 H 9660'-967T gl 9542' H4-1/2"FES X NP,ID=3.813" 9-5/8-x 4-1/2"WS WEDGE,ID=3.958 H 9857 -9869' 1111 9682" H4-1/2"FES X NP,E)=3.813" 9874' -14-1/2"FES X NP,13=3.813" 4-1/2"TBG, 12.6#, 13CR-85 VAM TOP, -1 9899' ---...„...„........ .0152 bpf,ID=3.958" 9914 -9-5/8"X 4-1/2'UNIQUE OVERSHOT 9947 H3.70"DER.OY SLV,ID=3.00' 4-1/2"TBG STUB(01/07/14) - 9904' i 5111 9947' -4-1/2"BKR PBR ASSY,ID=4.750'(E3EHIND LAIR) TOP OF 3-1/2"X 2-7/8"LNR&TOP OF CMT H 9942" lig I 9961* H3-1/7 FES X NIP,U"2.813" r-, N ;1111 4 .!; 9962' -9-5/8"X 4-1/2"BKR SAB PKR.D=4,75' 1 0, w/BKR K-22 ANCHOR -41 9967' H7"MLLOUT EXTENSION,D=6.00" BEHIND TUBING PUNCH - 9966'-9971' $gi t,• ,D.1 9973' -7 X 4-1/2"X0,0=3.958" CT LNR TOP OF 2-3/8"LNAR&TOP OF CMT 9979' go op. 9974' ---I35 KB L1P,0=1.82'(05/05/14) 4"4•1 1 1 1 rr*r.1%;11. 9979. -12.70"DEPLOY SLV,U"2.25" 3-1/2"LM,9.3#,L-80 STL,.0087 bpf,U=2.992" 9994' /St, p4S41 -4Vel ZirV. -13-1/2"X 3-3/16"XO,D=2.786"(:: i ND LNR) 4 **ivf.1, , 4-1/2"WHFSTOCK(05/24/07) - 10010" ELM D "40‘. 1 ' Ai. ' /V.101 16" MLLOUT WINDOW(02-18B)10010'-10029' 4-1/2"TBG-PC,12.6#,L-80 LTC AB-MOD, -10010 144 1.0' I 14 S'i VI"' .04/ 40 'For, 0152"f ID=3.958" I 1,4 VI 'iki. 1!e.,,,iv AALLOUT WINDOW(02-18C) 10220'- 10225' :4 VI 4ieto I 9-5/8"CSG,47#,S00-95 BTC,Dr 8.681" H -mov:i •N•11.1 ;kg,n, .4.401 41.44 •• •,,A..;% 10595' H TWO 2-3/8"RA TAGS,ID=1.995" PERFORATION SUWAARY ih igis,:, %Wirhy `A# 11945' --1%WO CEP(02117/16) REF LOG:MSL ON 04/23/14 N,,,, •\,h. ANGLE AT TOP PERF:91°@ 10640' ...ie e:,t'e. \•,,,,, PaTD -1 12565' lc :3444‘ei \-3... Note:Refer to Production DEt for historical perf data 15 ;#449 Nw :A"%ritle III WI 1111. Ell ir large v:- SIZE SR INTERVAL Opn/Sqz SI-DT SQZ "b • AO V diP..• • /4 % VI:I?. qi".-14-11..k 1.56" 6 10640- 10970 0 04/24/14 411 ... * 'Sr •tikt. 1.56" 6 11080-11240 0 04/24/14 N. ,; itc-le. 1,1 ,. ., _ . 4,. 2-3/8"LW,4.7#,L-80 STL, 12602" 1.56" 6 11280-11460 0 04/24/14 AILWIe a. .14 •:\ .0039 bpf,Dr 1.995" 1.56" 6 11630- 11875 0 04/24/14 3-3/16"PKR WilPSTOCK 10220' .14- 1.56" 6 11975-12100 C 04/24/14 w/RA TAG(04/07/14) • ..,„% • 70. • • 1.56' 6 12200- 12375 C 04/24/14 • '-* N. lk 3-3/16'LNR 6.2#,L-80 TCS, 10437" 41‘,1 •#it, • 1. .0076 Opt,ID=2.80" C I • - #V, V...• 2-718"Lr'•I2,6.4#,L-80 STL,.0058 bpi,ID=2.441' 12205' -.. DATE REV BY COR&ENTS - DATE REV BY COMENTS PRUDHOE BAY UNIT 09/29/80 PKR 176 INITIAL COMPLETION 04/30/14 NS/JM) Ft./AL ODE A PFROVAL WELL 02-18C 09/04/87 N35 RWO 05/08/14 SWO PJC SET KB LTP(05/05/14) PERMIT No: 2131630 08/17/95 N35 CTD SIDETRACK(02-18A) 02/18/16 SRDJAC).SET CEP(02/17/16) ARM): 50-029-20454-03 06/07/07 JGS CTD SIDETRACK(02-18B) 03/08/16 GC/JM) ADDED FEF e_Ev SEC 36,T11N,R14E,96'FI•1_&764'PM. 01/09/14 D-14 RWO 04/25/14 NORDIC 1 CTD SIDETRACK(02-18C) BF'Exploration(Alaska)