HomeMy WebLinkAbout192-127RE: UNDER EVALUATION: 5-38 ~D #1921270) Sustained IA Casing Pre~ure -Possible Tx... Page 1 of 2 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] 3~3~~0 Sent: Wednesday, March 03, 2010 3:33 PM ~~~ To: NSU, ADW Well Integrity Engineer; Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Optimization Engr; GPB, Wells Opt Eng; GPB, Well Pad SW; GPB, Prod Controllers Cc: Janowski, Carrie Subject: RE: UNDER EVALUATION: S-38 (PTD #1921270) Sustained IA Casing Pressure -Possible TxIA Comm All, Producer S-38 (PTD #1921270) passed a TIFL on 03/01/10. The passing TIFL verifies that the well has tubing integrity. The well has been reclassified as Operable. Please call with any questions or concerns. Thank you, Torin Roschinger (alt. Anna Dube) Well Integrity Coordinator Office (907) 659-5102 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 ~•. From: NSU, ADW Well Integrity Engineer Sent: Monday, March Ol, 2010 5:04 AM To: NSU, ADW Well Integrity Engineer; 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; 'Schwartz, Guy (DOA) <guy.schwartz@alaska.gov>'; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Optimization Engr; GPB, Wells Opt Eng; GPB, Well Pad SW; GPB, Prod Controllers Cc: Quy, Tiffany Subject: UNDER EVALUATION: 5-38 (PTD #1921270) Sustained IA Casing Pressure -Possible TxIA Comm All, Producer S-38 (PTD #1921270) has been reported to have sustained casino pressure on the IA due to possible TxIA communication. The wellhead pressures were tubing/IA/OA equal to 600/2260/0 on 02/27/10. The well has been reclassified as Under Evaluation, Once normal operations return following the inclement weather, a TIFL will be conducted to evaluate the well for possible TxIA communication. A TIO plot and wellbore schematic have been included for reference. « File: S-38 TIO Plot 03-01-10.doc» « File: S-38.pdf» ~ Please call with any questions or concerns. Thank you, Torin Roschinger (alt. Anna Dube) 3/3/2010 RE: UNDER EVALUATION: 5-38 ~ #1921270) Sustained IA Casing Pre~re -Possible Tx... Page 2 of 2 Well Integrity Coordinator Office (907) 659-5102 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 3/3/2010 PBU 5-38 PTD# 1921270 3/1/2010 TIO Pressures Plot a o~ ~: 3,000 2,000 1,000 -F Tbg -E- IA -~ DA ODA ~- OOOA On 1 • 12%05109 12/12109 12!19109 12/26109 01/02/10 01!09110 01!16110 01123/10 01/30110 02106/10 02/13/10 02!20110 02127!10 TREE = 6" 5M CM/ 'WELLHEAD = 11" 5M FMC ACTUATOR= BAKER KB. ELEV = 69.99' BF. ELEV = 36.8' KOP= 4441' Max Angle = 28 @ 6155' Datum MD = __ _ 9259' ~' Datum N D = ~ 8cvU 55j 13-318" CSG, 68#, L-80, ID = 12.415" Minimum ID = 2.635" @ 9071' 5-1/2" NIPPLE REDUCER S ES: ***Tx1A COMM. OPERATING ~~ ~ LIMITS: IAP = 2000 PSI, MAX. OAP =1000 PSI (05/16106 WAIVER)*** 209$' 5-1/2" OTIS SSSV LAND NIP, ID = 4.562" Q 2$10' EST TOP OF CEMENT (03!08104} GAS UFT MANDRELS ST MD TV D DEV TYPE V LV LATCH PORT DATE 4 3032 3032 0 CAMCO DOME RK 16 12/14/07 3 5355 5318 22 CAMCO DOME RK 16 12(14/07 2 7638 7404 24 CAMCO SO RK 20 12(14!07 1 8931 8575 26 CAMCO DMY*` RK 0 08105/07 "UMY WltX I tNUtU F'HI:KINt~ 1 titHINU NH I C:H $916'-$946' 5-1/2" WFD PATCH, ID = 2.90" 8961" 5-1/2" PKR SWS NIP, ID = 4.562" 9024 9-518" x 5-1/2" BKR HYDROSET PKR, ID = 4.75" 5-1/2" PKR SWS NIP, ID = 4.562" 9071" --) 5-1/2" PKR SWN NIP, ID = 4.455" 9071" 5-1/2" XN NIP REDUCER, ID = 2.635" (10!09107) 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" TOP OF 7" LNR 9-5/8" CSG, 47#, L-80, ID = 8.681" 90$4' --~5-1/2" W/LEG, ID=4.562" 9091" ELMD TT LOGGED 07119!97 9092' PERFORATION SUMMARY REF LOG: BHCS ON 12/10!92 ANGLE AT TOP PERF: 26 @ 9241' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSgz DATE 3-3/8" 4 9241 - 9291 O 12!29/92 3-318" 4 9364 - 9422 O 12/29/92 3-318" 4 9434 - 9474 O 12/29/92 3-3/8" 4 9474 - 9483 O 12/29/92 9312' --~ 7" x 4" BKR FB-1 PKR, ID = 4.00" 9326" 4-1/2" X NIP, ID = 3.813" 933 4-1/2" XN NIP, ID = 3.725" 9333' --~4-1/2" WILEG 9332` ELMD TT LOGGED 06/21 /94 PBTD 9570' 7" TBG, 26#, L-80 NSCC, .0383 bpf, ID = 6.276" 9649' DATE REV BY COMMENTS DATE REV BY COMMENTS 12/29/92 ORIGINAL GOM PLETION 08/07107 RCT/SV GLV GO 04/17!06 K5B/PAG GLV Ci0 (04(07(06) 10!22/07 RCT/PJC NIP RED/ XXP SET @ 9071' 05116!06 KSB/PJC GLV Cl0 12117!07 TFAlSV GLV GO & XXN PULL (12!14/07) 06/27/06 COMIPAG WAIVER SAFETY NOTE 12!17/07 TFA/SV WFD PATCH SET (12/14/07) 06/02/07 DAV/PAG GLV C/O 06/24/07 DTRiPJC SET PXN PLUG @ 9071' PRUDHOE BAY UNIT WELL: S-38 PERMff No: '1921270 API No: 50-029-22310-00 Sec. 35, T12N, T12E BP Exploration (Alaska} ~ ~J BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 June 25, 2009 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of S-Pad Dear Mr. Maunder, . b ~ ~u~ Q ~ zoos Enclosed please find a spreadsheet with a list of wells from S-Pad that were treated with corrosion inhibitor in the surface casing by conductor annutus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, ~i:~r'~,'3~`~'~i.,~ J~J~,.. ~fa ~? ~~i;~ Torin Roschinger BPXA, Well Integrity Coordinator ~ BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Spad ~ oAtR 6/25/2009 Well Name PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corcosion inhibitorl sealant date it bbls tt na al 5-018 1952020 025 NA 025 NA 2.6 5/30/2009 S-02A 1941090 025 NA 025 NA 1.7 5/25/2009 S-03 1811900 1325 NA 1325 NA 92.65 5/20/2009 S04 1830790 0 NA 0 NA 0.9 5/25/2009 S-OSA 1951890 0 NA 0 NA 0.9 5/26/2009 5-06 1821650 0 NA 0 NA 0.9 5/26/2009 S-07A 1920980 0 NA 0 NA O.s 5/26/2009 S-OBB 2010520 0 NA 0 NA 0.85 5/27/2009 S-09 7821040 1.5 NA 1.5 NA 9.4 5/31/2009 S-10A 1911230 0.5 NA 0.5 NA 3.4 5/31/2009 5-118 1990530 025 NA 025 NA 1.7 5/27I2009 S-12A 1851930 025 NA 025 NA 1.7 6/1/2009 5-13 1821350 8 NA 8 NA 55.3 6/t/2009 5-15 7840170 0.25 NA 025 NA 3 6/2I2009 S-17C 2020070 025 NA 025 NA 2.6 6/1/2009 S-18A 2021630 0.5 NA 0.5 NA 3 6/2/2009 S-19 1861160 0.75 NA 0.75 NA 22 5/19I2009 S-20A 2010450 025 NA 025 NA 1.3 5/19/2009 5-21 1900470 0.5 NA 0.5 NA 3.4 5/25/2009 S-22B t970510 0.75 NA OJS NA 3 5/19/2009 S-23 1901270 025 NA 025 NA t.7 5/25/2009 S-248 2031630 0.5 NA 0.5 NA 2.6 5/25/2009 S-25A 1982140 0.5 NA 0.5 NA 2.6 5/25/2009 S-26 1900580 0.75 NA 0.75 NA 3.4 5/26/2009 5-278 2031680 0.5 NA 0.5 NA 2.6 5/31/2009 5-288 2030020 0.5 NA 0.5 NA 2.6 5/31/2009 S-29AL7 1960120 0 NA 0 NA 0.85 5/27/2009 S-30 1900660 0.5 NA 0.5 NA 5.1 5/37/2009 S37A 1982200 0.5 NA 0.5 NA 3.4 5/26/2009 S32 1901490 0.5 NA 0.5 NA 3.4 5/31/2009 S-33 7921020 OS ~ NA 0.5 NA 4.3 5/26/2009 5-34 7921360 0.5 NA 0.5 NA 3.4 5/31/2009 S35 1921480 0 NA 0 NA .85in 5/31/2009 S36 1921160 0.75 NA 0.75 NA 4.25 5/27/2009 537 1920990 125 NA 125 NA 11.9 5/27/2009 5-38 1921270 025 NA 025 NA 102 5/27/2009 S-4t 1960240 1.5 NA 1.5 NA 11.1 5/30/2009 5-42 1960540 0 NA 0 NA 0.9 5/30/2009 S-43 1970530 0.5 NA 0.5 NA 1.7 5/28/2009 S-a4 1970070 025 NA 025 NA 1.7 5/28/2009 5-100 2000780 2 NA 2 NA 21.3 5/29/2009 5-101 2001150 1.25 NA 1.25 NA 11.9 5/29/2009 S-102L7 2031560 1.25 NA 125 NA 11.1 5/31/2009 S403 2001680 L5 NA 1.5 NA 11.9 5/18/2009 S-t0a 2001960 1.75 NA 7.75 NA 15.3 5/20/2009 S-7o5 2001520 4 NA 4 NA s2.7 5/20/2009 5-106 2010120 16.25 NA 16.25 NA 174.3 6/2l2009 5-107 2011130 225 NA 225 NA 28.9 5/18/2009 S-108 2017000 3.5 NA 3.5 NA 40 5/30/2009 S-tOS 2022450 2 NA 2 NA 21.3 5/30/2009 &110 2077290 11.75 NA 11.75 NA 98.8 5/30/2009 5-11 t 2050510 2 NA 2 NA 19.6 5/30/2009 S-112 2021350 0 NA 0 NA 0.5 5/30/2009 5-113 2021430 1.75 NA 1.75 NA 22.7 5/18/2009 S-1 t4A 2021980 1.25 NA 7 25 NA 102 5/30l2009 S-115 2022300 2.5 NA 2.5 NA 272 5/29/2009 S-716 2031810 7.5 NA 1.5 NA 13.6 5/28/2009 &t~7 2030120 1.5 NA 1.5 NA 15.3 5/29/2009 S-118 2032000 5 NA 5 NA 76.5 5l28/2009 5-179 2041620 1 NA 1 NA 52 5/30/2009 5-120 2031980 5.5 NA 5.5 NA 672 5/29/2009 5-721 2060470 4.5 NA 4.5 NA 53.6 5/28l2009 5-122 2050810 3 NA 3 NA 21.3 5/29/2009 S-723 2041370 1.5 NA 1.5 NA 2o.a 5/26/2009 5-124 2061360 1.75 NA 1.75 NA 77.s 5/26/2009 5-125 2070830 225 NA 2.25 NA 20.4 5/28/2009 5-726 20710g70 125 NA 725 NA 15.3 6/1/2009 5-200 1972390 125 NA 7 25 NA 14.5 5/26/2009 5-207 2001840 0 NA 0 NA 0.85 6/19/2009 5-213A 2042130 2 NA 2 NA 13.6 5/29/2009 S-215 2021540 2 NA 2 NA 18.7 6/1/2009 S-2ts 2001970 4.75 NA 4.75 NA 51 5/29/2009 S-217 2070950 025 NA 025 NA 1J 6/1l2009 5-400 2070740 2 NA 2 NA 9.4 5@8J2009 S-a01 2060780 16 NA t6 NA 9s.5 6/2/2009 S-504 0 NA 0 NA 0.85 5/28/2009 ~ ~ 5-38 (PTD #1921270) Internal W~er Cancellation -Not Operable Well Page 1 of 1 • Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Saturday, November 24, 2007 7:23 PM To: Maunder, Thomas E (DOA); Regg, James B (DOA); NSU, ADW Wefl Operations Supervisor; Rossberg, R Steven; GPB, GC2 Wellpad Lead; GPB, GC2 OTL; GPB, Area Mgr West (GC2/WRD); GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers Cc: Ohms, Danielle H; NSU, ADW Well Integrity Engineer; NSU, ADW WI Tech Subject: S-38 (PTD #1921270) Internal Waiver Cancellation -Not Operable Well All, An internal waiver was issued for TxIA communication on well S-38 (PTD #1921270) on 06/27/06. Although this well is allowed to produce under dispensation from the Well Integrity System Policy until 12/31/07 if all compliance testing remains current, we are currently progressing a tubing patch program. The well is currently shut-in and will remain so ~- until the tubing hole is repaired. The well has been reclassified as Not Operable. Please remove all Waivered well signs and the laminated copies of the waiver from the wellhouse. Please call with any questions or concerns. Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 '~~ ~~~ ~ ~ Z~Q~ 11 /26/2007 ell o # 011 Description ate o or H-13 11676950 GAS ENTRY SURVEY 06/20/07 1 C-41 11801077 LDL 06/19/07 1 A-30A 11661159 MEM PROD PROFILE 06/23/07 1 W-21 A 11661140 MEM PROD PROFILE 04/21/07 1 E-21B 11661157 MEM PROD PROFILE 06/19/07 1 M-23 11626107 PRODUCTION PROFILE 06/23/07 1 01-21 11824330 PRODUCTION PROFILE 06/22/07 1 J-25A 11767130 MEM PROD PROFILE 06/18/07 1 Z-08A 11630483 GLS/PROD LOG 06/22/07 1 M-34 11824330 PRODUCTION PROFILE 06/22/07 1 02-30B 11594512 LDL 06/23/07 1 Z-29 11686758 PRODUCTION PROFILE 06/15/07 1 S-38 11801078 LDL 06/20/07 1 H-37A 11594506 PPROF/IPROF (REVISED) 06/05/07 1 N-15 11637129 PROD PROFILE (REVISED) 06/13/07 1 Z-13A 11649962 MEM PROD PROF (REVISED) 04/21/07 1 P2-15A 11594511 SCMT 06/15/07 1 12-05 11676951 USIT (CEMENT) 06/24/07 1 12-05 11676951 USIT (CORROSION) 06/24/07 1 B-15 11626097 USIT 06/14/07 1 G-24A 11628750 SCMT 02/05/07 1 Schlullbepger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth W J b RECEIVED JUl 0 3 ZOOl ¡\Jæka Oil & Gas Cons. CommIssion Anchorage L 06/29/07 NO. 4324 Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay D CI . BL CD . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. PetrotechnicéJl Data Center LR2-1 SCANNED JUL 0 5 2007 900 E. Benson Blvd. Anchorage, Alaska 99508 10 :f - 1 Ð r Date Delivered: Alaska Data & Consulting Services 2525 Gambe" Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: 8-38 Reclassified to Trouble status e ffD~ ¡CfZ-IZ7 Subject: S-38 Reclassi lied to Trouble status From: "Recves,. Donald F" <:RccvesDltâìb J.coln:> 'Í7 _. 1{~)'11 .~ ~ ~v~ Date: Sat, 31 Dec 2005 08:25:35 -0900 {1 To: ":--.JSU, ADW Well Operations Supervisor" ·<NSUADWWclIOpcratiollsSupcrvisor@bp.com>, "Rossberg, R Steven" <Stc\'cn.Rossbcrg@bp.colTI>. "GPl3, GC2 Area Mgr" <GPRGC2TL@bp.com> CC: "MCCOLLUM, CODY 0 (VECO)" <Cody.McCollum@bp.com>, "l/olt, Ryan P (VECO)" <Ryan.I.lolt@bp.com>, "GPß, Wclls Opt Eng" <GPBWcllsOptEllg@bp.com>, "GPß, OptimiJ:ation Engr" <GPBOptimizationEngr@bp.com>, "Okwelegbe, Mark" <mark.okwelegbc@.bp.com>, "AOGCC \V.inton Aubert (E-mail)..<\.v·inton_aubcrL@;admin.state.ak.us>. James Regg <jim, rcgg@admin.statc.ak.us>, "GPB, GC2 Wcllpad Lead" <GPBGC2\VcllpadLcad@bp.com>, "Winslow, Jack L." <LYOllSW@bp.com> All, Well 8-38 has been reclassified to Trouble well status. Please remove any waiver related signage from the wellhouse. The well was waivered for TxlAxOA communication on 3/11/04, but the WI Risk Assessment findings require the well to be repaired or 81 by 12/31/05. Recent gas lift valve work was unsuccessful in restoring tubing integrity, therefore the well must be 81 and waiver cancelled. Good news: TIO pressure data shows the IAxOA communication to be manageable by bleeds so the plan forward is to set a TTP and get a CMIT-TxIA to write a new TxlA comm waiver. Until the new waiver can be written the old waiver is cancelled and well status is Trouble. Please call with questions. Thanks, Donald Reeves Well Integrity Engineer - Filling in for Anna Dube 907-659-5102 907-659-5100 Pgr 1154 ',- "- ,,",,:. tt'ë ~ nJ, i:~'<~' 1 \jt,;kJ;thk:'¡-; ( C 1 of 1 1/3/2006 10:48 AM THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE DECEMBER 01, 2000, E PL W M ATE IA L UNDER TH IS M ARK ER .~OGCC Individual Well Geological Materials Inventory Page: 1 Date' 11/16/94 PERMIT DATA T DATA_PLUS RUN DATE_RECVD 92-127 5502 T 8181-9667 OH/FINALS 01/04/93 92-127 407 R COMP DATE: 12/31/92 02/17/93 92-127 DAILY WELL OP R 11/25/-12/14/92 02/17/93 92-127 SURVEY R 0.00-9157 02/17/93 92-127 BHC/SL/GR L 9224-9617 1 04/14/94 92-127 PFC/GR L 9250-9262 1 01/25/93 92-127 PFC/GR L 9200-9350 1 07/12/93 92-127 PFC/GR L 9300-9480 1 04/12/93 92-127 PFC/GR L 9240-9490 1 03/15/93 92-127 PFC/GR L 9250-9262 1 01/25/93 92-127 PIL/SFL/GR L 9224-9647 1 01/25/93 92-127 PLS L 9100-9426 1 07/25/94 92-127 PLS L 9100-9390 1 06/03/94 92-127 SBT L 8050-9571 1 04/14/94 Are dry ditch samples required? yes /~~And received? yes ~.- Was the well cored? yes /~o//Analysis & description received/? Well is in compliance~~~{k~q~l COMMENTS Petrotechnical Data Cent~-~ BP Exploration (Alaska) 900 East Benson Boulevard Anchorage, A~ 99908 Received by Date ALASK~ OIL & GAS COMSERVATION COM~MISSION Attn. LARRY GRANT BOO1 PORCUPINE DR. ANCHOPJtGE AK, 99501. USA Date: 7 July 1994 RE: Transmittal of Data Sent by: ATLAS WIRELZNE Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION .-lS (Ol-',1-13) /g CN/GR FINAL BL 1 CN/GR FINAL RF N-Ol ( .3-0S-11-13) ~.~CN/GR FINAL BL 1 CN/GR FINAL RF /~1 CN/GR FINAL EL ! CN/GR FINAL RF ,~ CN/GR FINAL BL 1 CN/GR FINAL RF ,~PLS FINAL BL 1 PLS FINAL RF /~GR/JEWELRY FINAL BL 1 GR/JEWELRY FINAL RF //1 PFC/PERF FINAL BL 1 PFC/PERF FINAL RF ...4fPFC/PERF FINAL BL 1 PFC/PERF FINAL RF L Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson ECC No. Run # 1 5955.01 Run ~ 1 Run # 1 ,4060.03° Run # 1 Run # 1 6224.00 Run # 1 Run # 1 1291.01 Run # 1 Run # 1 5840.04 Run # 1 Run ~ 1 3397.03 Run # 1 Run # 1 6181.03 Run # 1 Run # 1 5809.02 Run # 1 · . RECEIVED JUL ] 5 1994 ~aska Oil & Gas Cons. Commission' Anchorage Received by: Date: STATE OF ALASKA ALAS-~ OIL AND GAS CONSERVATION COMMISSI¢ '-' REPORT (-,d SUNDRY WELL OPE' _ATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Pull tubing __ Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1643' SNL, 1670' EWL, SEC. 35, T12N, R12E At top of productive interval 101' NSL, 2678' WEL, SEC. 26, T12N, R12E At effective depth 5175 SNL, 2595' WEL, SEC. 26, T12N, R12E At total depth 131' SNL, 2695' EWL, SEC. 26, T12N, R12E Repair well Other X 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE=69 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-38(24-26-12-12) 9. Permit number/approval number 92-127 / 10. APl number 50- 029-22310 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length __ 76 2877 9650 feet Plugs (measured) 9220 feet 9571 feet Junk (measured) 9149 feet Size Cemented 20 11 yds Arcticset 13 3/8 2045/461 c. f III/11 9 5/8 1929c. f Class "G" -. 551 measured 7 218 c.f. Class "G" 9364 - 9422', 9474'- 9483' true vertical subsea 8894'- 8945', 8991'- 8999' Measured depth 141 2893 9221 9098-9649 True verticaldepth BKB 141 2893 8835 8724-9215 Tubing (size, grade, and measured depth) 5 1/2", L-80 @9084' Packers and SSSV (type and measured depth) Packer @9018' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1760 1056 249 1035 1670 ~ 916 1090 1245 Tubing Pressure 248 278 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the~foregoi~,: true ~n.d correct to the best of my knowledge· · r--'- ' i' ~, /'/ ' : ' S,~ned ' /~'.'W . "'"" ~ /~" T/d~+;, Title Senior Technical Ass,tant , Form 10-404 Rev 06/15/88 /,7--- SUBMIT IN D~PLI~ATE 4/18/93 4/23/93 7/01/93 fjh 6/20/94 WELL S-38(24-26-12-12) REPERF/FRAC/ADDPERF The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 9364' - 9394' MD Performed a Hydraulic Fracture using the following fluids: FLUIDS PUMPED DOWNHOLE INJ TEST: 325 DATA FRAC#1' DATA FRAC#2: BBLS 20# GEL 20 BBLS 40# GEL PREPAD TO ESTABLISH RATE BBLS 40# X-LINK GEL PAD W/4*% ESL (210 GAL) BBLS 20# GEL DATA FRAC FLUSH 20 BBLS 40# GEL PREPAD TO ESTABLISH RATE 135 BBLS 40# X-LINK GEL PAD W/4*% ESL (210 GAL) 211 BBLS 20# GEL DATA FRAC FLUSH 10 BBLS DSL TO FREEZE PROTECT WELL FRAC: 20 BBLS 40~ GEL PREPAD TO ESTABLISH RATE 104 BBLS 40# X-LINK GEL PAD W/4% ESL (210 GAL) 28 Dirty 1 PPG 7 2 PPG 10 3 PPG 12 4 PPG 15 5 PPG 16 6 PPG 17 7 PPG 64 8 PPG 20/40 87 8 PPG 16/20 72 10 PPG 213 ~ 20# LINEAR GEL FLUSH 135 211 LOAD VOLUME: 1732 (TOTAL FLUIDS PUMPED DOWN HOLE) 80 Total diesel pumped downhole (incl annulus) 125 Diesel Recovered The following additional interval were perforated using 3 3/8" guns, 4 SPF, random orientation and 120° phasing. 9241'-9291'MD ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 17 May 1994 Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION ,,~ PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA /1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA K-10 (31-05-11-14) /1DIFF.TEMP. FINAL BL 1 DIFF.TEMP. RF SEPIA J-10 (10-11-13) 1 DIFFTEMP/GR FINAL BL /1 DIFFTEMP/GR RF SEPIA q2-}lq S-38 (24-26-12-12) /1 PLS FINAL BL 1 PLS FINAL RF SEPIA ~ 7-- l'OrL S-33 ( 11-35-12-12 ) / PLS FINAL BL 1 PLS FINAL RF SEPIA S-35 (23-26-12-12-) 1 PLS FINAL BL 1 PLS FINAL RF SEPIA (41-34-12-12) ,% PLS FINAL BL ! PLS FINAL RF SEPIA ~.l PDK/GR/CCL FINAL BL 1 PDK/GR/CCL RF SEPIA Cont/ ECC No. Run ~ 1 6196.00 Run ~ 1 Run # 1 6162.01 Run ~ 1 Run # 1 3556.04 Run # 1 Run # 1 Run ~ 1 4887.03 Run ~ 1 5840.03 Run # 1 Run ~ 1 5750.09 Run # 1 Run ~ 1 5867.05 Run # 1 Run # 1 5788.05 Run ~ 1 Run # 1 5858.05 Run # 1 OGCC Individual Well Geo_ ~ical Materials Inventory Page: 1 Date: 04/15/94 PERMIT DATA T DATA_PLUS RUN DATE_RECVD 92-127 BHC/SL/GR L 9224-9617 1 04/14/94 92-127 PFC/GR L 9200-9350 1 07/12/93 92-127 PFC/GR L 9240-9490 1 03/15/93 92-127 PFC/GR L 9250-9262 1 01/25/93 92-127 PFC/GR L 9250-9262 1 01/25/93 92-127 PFC/GR L 9300-9480 1 04/12/93 92-127 PIL/SFL/GR L 9224-9647 1 01/25/93 92-127 SBT L 8050-9571 1 04/14/94 92-127 407 R COMP DATE: 12/31/92 02/17/93 92-127 DAILY WELL OP R 11/25/-12/14/92 02/17/93 92-127 SURVEY R 0.00-9157 02/17/93 92-127 5502 T 8181-9667 OH/FINALS 01/04/93 Are dry ditch samples required~d received? ~ Was the well cored? y~~s & description rece Are well tests required~eived?~ ived? ~ Well is in compliance ~J ~ I~'~t~al Comments BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 07/07/93 T# 84739 BPX/PBUOLOGS Enclosed is your copy of the materials listed questions, please contact BP Well Records at _4oq N-20 ~~PE~PRODUCTION LOG S-2490~5 PE~ S-2590-ID5 PE~ S-33Q~' [OL PE~ S-35 qZ-~q~ PE~ S-36 ~%-{[~ PE~ 06/28/93 #1 06/26/93 #1 06/26/93 #1 07/01/93 #1 07/01/93 #1 07/01/93 #1 07/03/93 #1 06/30/93 #1 06/30/9~ #1 06/28/93 #1 07/01/93 #1 06/30/93 #1 below. If you have any (907) 564-4004. 9200.00-10194.00 ATLAS 10980.00-12361.00 ATLAS 10980.00-12361.00 ATLAS 9915.00-10056.00 ATLAS 9700.00- 9950.00 ATLAS 9058.00- 9253.00 ATLAS 900Q.00- 9200.00 ATLAS 10100.00-10259.00 ATLAS 9500.00- 9702.00 ATLAS 9765.00- 9986.00 ATLAS 9200.00- 9350.00 ATLAS 13940.00-14224.00 ATLAS ~! 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " Information Control Well Records RECEIVED .. JUL 1 2 1995 A~aska Oil & Gas Cons. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 BP/PBU GS DATE: 04/22/93 T# 84495 Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ~. S-38 X-14A PFC 04/18/93 #1 PFC 04/18/93 #1 Information Control Well Records 9300.00- 9480.00 ATLAS 5 " 11680.00-11891.00 ATLAS 5 " RECEIVED APR ? 2 199 Alaska Oil & Gas Cons. C°mr~issior~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03-11-93 T# 84395 BPX CH LOGS Enclosed is If you have Records at your copy of the materials listed below. any questions, please contact BP Well (907) 564-4004. M-19A~CH S-18 ~~-~CH S-3R6~"tL'~ _ CH X-14A 03/05/93 REF#124762 03/03/93 REF#124805 03/04/93 REF#124806 03/04/93 REF#124761 PRODUCTION PRODUCTION PRODUCTION PRODUCTION LOGGING SERV ATLAS LOGGING SERV ATLAS LOGGING SERV ATLAS LOGGING SERV ATLAS Information Services Well Records RECEIVED MAR 1 5 199;) Alaska 011 & Gas Cons. Commleslon Anchorage " · STATE OF ALASKA ALASKA ,.)IL AND GAS CONSERVATION CL,,¢iMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG · Status of Well OIL [] GAS [] SL1SPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exp/oration 92-127 3. Address 8. APl Number P. O. Box 196612, Anchorage, A/aska 99519-6612 50- 02~-22310 Classification of Service Well 4. Location of well at surface 1643' SNL, 1670' EWL, SEC. 35, T12N, R12E At Top Producing Interval 101' NSL, 2678'EWL, SEC. 26, T12N, R12E At Total Depth 131' NSL, 2695' EWL, SEC. 26, T12N, R12E 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number S-38i (24-26-12-12) '11. Field e. nd Pool Prudhoe Bay Field/Prudhoe Bay Poe; 5. Elevation in ~eet (indicate KB, DF, etc.) 16. Lease D&§'i~i~tion and Sedal No. KBE = 69' I ADL 2825/ 11/24/92 ! 12/10/92 ~ 12/29/92 N/Aoot MSL One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)~19. Directional Survey 120. Depth where SSSV set ~21. Thickness of Permafrost 9650' MD/9220' TVD ~ 9571' MD/9149' TVD ! YES ~ NO [] I 2098feet UD ! 1870'(Approx.) 22. Type Electric or Other Logs Run DIL/BHC/GR 23. CASING, LINER AND CEMENTING RECORD CASING SIZE WT. PER FT. GRADE HOLE ~ CEMENrTING RE.CORD AMO~ PULLED 2~' 91.5~ H-40 30" 13-3/8 68# L-80 16" 9-5/8 47# L-80 12-1/4" 1929 cu ft Class "G' 7' 26# NTSOS 8-1/2" 218 cu ft Class "G" SETI'ING DEPTH MD TOP BOTTOM Surface 76' Surface 2893' Surface 9221' 9O98' 9649' 24. Pedorations open to Production (MD+TVD of Top and Bottom and interval, size and number) Gun Diameter 3-3/8"MD 7~/~f 9364'-9422' 8894'-8945' (ss) 9474'-9483' 8991-8999 ('..S) 11 yds Arcticset 2045 cuft CSIII/461 cuft CS II [25. TUBING R EC, ORD DEPTH SET (MD) I PACKER SET (MD) SLZE i 9084' 9018' I I 26. ACID, FRACTURE, CEMENT SQUE~:~, ETC. DEPTH INTERVAL (MD) AMOUNT & KINO OF MATERIALUSED 27. PROEX..~TION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 12/31/92 Gas D'ft ~. ' Date of Test Hours Tested TEST PERIOD PROBL~TIONFOR OIL'BBt ~GAS-M"'F IWATER-BBL ICHOKES!ZS IG OIL RAT'OI~ ' 128. CORE DATA Brief description of lithology, porosity, frac~ ~s, apparent dips, and presence of oil, gas or water. Submit core chiF~. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate ,' ' 30. GEOLOGIC MARKERS -~MATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 9241' 8855' Shublik 9289' 8896' Top Sadlerochit 9363' 8962' · : . , . , . , , · , · . :'~!';':.'..~:"~,-! !.i~',~ .',,: .... .... ". ~, · i',:',,. '!(,i;: ;.. '~'~.:..;-,~ .. 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting aL complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas ~njection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24 · If this well Js completed-for separate production from more than one interval (r",ultiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple st-'.tge cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: S-38 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 11/24/92 07:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 11/25/92 ( 1) TD: 890' ( 890) 11/26/92 ( 2) TD: 2168' (1278) 1i/27/92 ( 3) TD: 2900' ( 732) 11/28/92 ( 4) TD: 2900' ( 0) 11/29/92 ( 5) TD: 3885' ( 985) 11/30/92 ( 6) TD: 5206'(1321) DRLG @ 890' MW: 8.8 VIS:317 NU DIVERTER, RISER & FLOW LINE, FUNCTION TEST DIVERTER, PU BHA, DRILL F/108' TO 258', GYRO, DRIL F/258'-498', GYRO, DRILL F/498'-669', CHG "0" RING IN MUD LINE, DRILL F/669'-775', GYRO, DRILL F/775'-890' DRILLING AT 2168 MW: 9.6 VIS:300 DRILLING & SURVEYS TO 1010'. SHORT TRIP. DRILLING TO 1119'. POH. DRILLING TO 1241' POH. CHANGE BIT. RIH. DRILL & GYROS TO 2168' CIRCULATING MW:10.0 VIS:185 DRILLING & SURVEYS TO 2852'. POH. RIH TO 2852' DRILLING TO 2900' CIRC. POH. RUN 13-3/8 CASING. CIRC. RIH W/BIT #4 MW: 8.4 VIS: 28 CIRC & RECIPROCATING 13-3/8 CASING. PUMP WATER, TEST CEF~NT LINES. TOP CEMENT JOB. INSTALL & TEST BOPE. RIH W/BIT #4. DRILLING AT 3885 MW: 9.3 VIS: 35 CBU. TEST 13-3/8 CASING. MILL TO 2800' TEST 13-3/8 CASING. PERFORM LOT. DRILL TO 3885' DRILLING AT 5208 MW: 9.8 VIS- 38 12/01/92 ( 7) TD: 6519' (1313) 12/02/92 (8) TD: 6835' ( 316) 12/03/92 ( 9) TD: 7670' ( 835) DRILING AT 6510 MW:10.0 VIS: 41 DRILLING TO 5304' SHORT TRIP. DRILLING TO 6318' SHORT TRIP. DRILLING TO 6510'. TRIP IN HOLE MW:10.2 VIS: 43 DRILLING TO 6835' CIRC. TOH. REPLACE DRAW WORKS CLUTCH. TOH. CHANGE BHA & BIT. ORIENT. TIH W/BHA #6. DRILLING TiH WBIT #BHA#6. DRILL TO 7670' MW:10.2 VIS: 38 12/04/92 (10) TD: 8008' ( 338) BIT TRIP MW:10.2 VIS: 40 DRILL TO 7695'. CUB. TOH. REAM TO 7695' DRILL TO 8003'. CBU. WELL : S-38 OPERATION: RIG : NABORS 28E PAGE: 2 12/05/92 (11) TD: 8340' ( 332) 12/06/92 (12) TD: 8770' ( 430) DRILLING MW:10.5 VIS: 41 WEEKLY BOPE TEST, TRIP IN HOLE W/BIT #8, REAM F/7430'-8008', HOLE PAKCING OFF & STICKING F/7472'-7600', TIGHT @ 7800', DRILL F/8008' TO 8340' DRILLING MW:10.5 VIS: 43 12/07/92 (13) TD: 8770' ( 0) MW:10.5 VIS: 0 12/07/92 (15) TD: 9110'( 340) DRILLING MW:10.5 VIS: 41 12/08/92 (16) TD: 9235' ( 125) 12/09/92 (17) TD: 9235' ( 0) 12/10/92 (18) TD: 9650' ( 415) 12/11/92 (19) TD: 9650' ( 0) 12/12/92 (20) TD: 9650 PB: 9571 12/13/92 (21) TD: 9650 PB: 9571 RUN 9-5/8" CSG MW:10.5 VIS: 44 MU 8.5" BHA MW:10.5 VIS: 43 RUN 9-5/8 CSG, CIRC. TEST CMT LINES, PUMP SPACER., DSPL CMT, BUMP PLUG. CIP. INSTL PKOFF, TEST FAILED, REPLC PKOFF, TEST. CHG RAMS, INJECT MUD. TEST BOPE, INSTL WEAR RING. MU BHA. CBU MW: 9.3 ViS: 40 RIH. TAG FC @ 9138' CBU. TEST 9-5/8" CSG TO 3000 PS.~. OK. DRILL FC & NEW FMTN TO 9245' CIRC & COkk.' MUD. 3RILL F/ 9245' TO 9650' TD'D WELL @ 0430 HRS 12/10/92. SHORT TRIP TO 9210' CIRC HI-VIS SWEEP. CIRC. MW: 9.3 ViS: 40 POOH. R/U SWS. LOG RUN: DIL/BHC/GR. R/D SWS. RIH W/ BHA. CBU. POOH. L/D BHA. RIH W/ 7" LNR ON DP. CiRC @ SHOE. RIH. CIRC. LD 5" DP MW: 8.~ Seawater C!RC & COND MUD. PUMP WATER. TEST CEMENT LiN~:S. SET HANGER & PACKER. RELEASE LINER. REVERSE CIRC. RIH. CIRC. TEST 7" CIRC. REVERSE CIRC. RETEST liNER. CIRC. RUN 5-1/2 TUBING MW: 8.5 Seawater POH. RUN SBT/CL/CLB. SET ISOLATIN PACKER. RUN 5-1/2 TUBING WELL : S-38 OPERATION: RIG : NABORS 28E PAGE: 3 12/14/92 (22) TD: 9650 PB: 9571 RELEASED RIG AT 0130 HRS MW: 8.5 Seawater RUN 5-1/2 TUBING. TEST CONTROL LINE. TEST TUBING. ND BOPE. INSTALL & TEST CHRISTMAS TREE. INSTALL BPV. RELEASED RIG 01:30 HRS. 12/15/92. SIGNATURE: (drilling superintendent) DATE: sPE 'C-SUN DR'rLLTNG SERVTCES ANCHORAGE ALASKA PRUDHOE BAY DRZLLZNG PBU/S-38Z 500292231000 NORTH SLOPE COHPUTATZON DATE: 12/ 8/92 DATE OF SURVEY: 12/07/92 HWD SURVEY JOB NUHBER: AK-HW-20091 KELLY BUSHZNG ELEV. = 69.00 FT. OPERATOR: BP EXPLORATZON TRUE SUB-SEA HEASD VERTZCAL VERTZCAL DEPTH DEPTH DEPTH COURS COURSE DLS TOTAL ZNCLN DZRECTZON RECTANGULAR COORDZNATES VERT. DG NN DEGREES DG/IO0 NORTH/SOUTH EAST/WEST SECT. 0 .00 -69.00 234 234.00 165.00 504 504.00 435.00 743 743,00 674.00 985 984.99 915.99 0 0 N .00 E .00 .OON .OOE .00 0 0 N .00 E .00 .OON .OOE .00 0 12 S 55.00 E .07 .27S .39E -.04 0 15 N 57,00 W .19 .23S .29E -,05 0 15 N 44.00 W .02 .44N .52W .12 1279 1278.99 1209.99 1532 1531,99 1462.99 1893 1892.97 1823.97 2137 2136.96 2067.96 2455 2454,95 2385.95 0 18 S 33.00 W .15 .26N 1.38W -.47 0 15 N 54.00 E .21 .03N 1.30W -.63 0 42 N 35.00 E ,13 2.30N .60E 2,29 0 30 N 16.00 E ,11 4.54N 1.75E 4,81 0 15 S 31.00 E .22 5.28N 2.49E 5.82 2827 2826.94 2757,94 3178 3177.93 3108.93 3498 3497.93 3428.93 3815 3814.92 3745.92 4261 4260,92 4191.92 0 30 N 47.00 E .16 0 24 S 84,70 W ,24 0 18 N 83.40 W .04 0 0 N .00 E .09 0 30 S 12.90 W .11 5.69N 4.10E 6.98 6.62N 4.00E 7.73 6.62N 2.05E 6.75 6.71N 1.23E 6,42 4,81N .79E 4.56 4441 4440.53 4371.53 6 41 N 16.60 E 4,00 4632 4628.62 4559,62 13 0 N 19.60 E 3,31 4824 4814.66 4745.66 15 36 N 23.30 E 1,43 4919 4906.00 4837.00 16 17 N 23.50 E .74 5014 4997.04 4928.04 16 53 N 24,20 E .67 14.12N 3.62E 14.03 45.07N 14.02E 46.02 89,13N 31.48E 92.89 113.09N 41.85E 118.82 137.91N 52.83E 145.79 5204 5177.31 5108.31 19 53 N 25.60 E 1.60 5393 5353.88 5284.88 21 53 N 31.20 E 1.49 5583 5529,22 5460.22 23 23 N 33.20 E .89 5774 5703.20 5634.20 25 17 N 34.40 E 1.03 5964 5875,05 5806.05 25 12 N 29.80 E 1.03 192.28N 78.12E 205.51 251.45N 110.29E 272.83 313.32N 149.30E 345.93 378.74N 193.13E 424.51 447.34N 236.17E 505.44 6155 6046.17 5977.17 27 30 N 31,70 E 1,28 6344 6216,10 6147.10 24 23 N 34,00 E 1,72 6536 6390,24 6321.24 25 23 N 35.40 E ,60 6728 6564.93 6495,93 23 36 N 36,00 E ,95 6823 6652.22 6583,22 22 53 N 34,70 E ,91 520.14N 279.55E 590.18 589.65N 324.32E 672.77 656.09N 370,35E 753.35 720.75N 416.79E 832.58 751.33N 438.49E 869.92 6918 6739.82 6670.82 22 36 N 33,90 E .45 7015 6829.47 6760.47 22 17 N 33.90 E ,31 7206 7006,19 6937.19 22 17 N 33.90 E .01 7363 7151.08 7082.08 23 0 N 30,60 E .92 7552 7324,73 7255.73 23 30 N 29.80 E .31 781.68N 459.20E 906.56 812.42N 479.86E 943.53 872.58N 520.28E 1015.85 923.70N 552.51E 1076.24 988.18N 590.03E 1150.84 SPE (-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/S-38I 500292231000 NORTH SLOPE COMPUTATION DATE: 12/ 8/92 DATE OF SURVEY: 12/07/92 MWD SURVEY JOB NUMBER: AK-MW-20091 KELLY BUSHING ELEV, = 69.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE MEASD VERTICAL VERTICAL INCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES DLS TOTAL RECTANGULAR COORDINATES DG/IO0 NORTH/SOUTH EAST/WEST 7745 7501.31 7432.31 24 6 N 30.00 E .31 1055.70N 628.85E 7930 7669,99 7600,99 24 23 N 31.40 E ,35 1121.03N 667,65E 8031 7761.89 7692.89 24 36 N 31,10 E .23 1156.83N 689.38E 8125 7847,22 7778.22 25 0 N 31.60 E ,48 1190.50N 709.89E 8221 7934.09 7865.09 25 23 N 31,80 E .43 1225.28N 731,37E VERT. SECT. 1228.73 1304,70 1346.58 1386,00 1426.85 8316 8019.90 7950.90 25 23 N 27,50 E 1.94 1260.67N 751.51E 8413 8107,60 8038,60 25 12 N 27,50 E ,21 1297.44N 770.66E 8509 8194.35 8125.35 25 30 N 27.70 E ,33 1333,86N 789,70E 8604 8279.81 8210.81 26 17 N 26.90 E .92 1370,74N 808,73E 8692 8358.74 8289.74 26 12 N 26,50 E .23 1405.51N 826.21E 1467.57 1508.98 1550.04 1591.49 1630.34 8797 8453.31 8384,31 25 17 N 26,70 E .86 1446.30N 846.64E 8891 8538.22 8469.22 25 30 N 28,20 E .72 1482.07N 865,22E 8987 8624.76 8555.76 25 47 N 27.00 E .62 1518.90N 884.47E 9082 8710.22 8641.22 26 0 N 28.90 E .90 1555,55N 903.92E 9157 8777,57 8708.57 26 12 N 29.00 E ,27 1584,42N 919.89E 1675.87 1716.14 1757.65 1799.11 1832.10 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 1832.10 FEET AT NORTH 30 DEG. 8 MIN. EAST AT MD = 9157 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 30.14 DEG. SPEt' -SUN DR'fLL]'NG SERVTCES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRZLLZNG PBU/S-38Z 500292231000 NORTH SLOPE COMPUTATZON DATE: 12/ 8/92 DATE OF SURVEY: 12/07/92 JOB NUMBER: AK-MW-20091 KELLY BUSHZNG ELEV. = 69.00 OPERATOR: BP EXPLORATZON FT. ZNTERPOLATED VALUES FOR EVEN 10 TRUE SUB-SEA TOTAL MEASD VERTZCAL VERTZCAL RECTANGULAR cOORDZNATES DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST O0 FEET OF MEASURED DEPTH MD-TVD VERTZCAL DZFFERENCE CORRECTZON 0 .00 -69.00 .00 N .00 E 1000 999.99 930.99 .49 N .56 W 2000 1999.97 1930.97 3,37 N 1.35 E 3000 2999.94 2930.94 6,72 N 5.20 E 4000 3999.92 3930.92 6,71 N 1.23 E .00 .01 .01 .03 .03 .06 i03 .08 .01 5000 4983.65 4914.65 134.20 N 51.16 E 16.35 6000 5907.62 5838.62 460,64 N 243,79 E 92.38 7000 6815.59 6746.59 807.70 N 476.68 E 184.41 8000 7733.71 7664.71 1145.78 N 682.71 E 266.29 9000 8636.46 8567.46 1523.94 N 887.04 E 363.54 16.28 76.03 92.03 81 .89 97.24 9157 8777.57 8708.57 1584.42 N 919.89 E 379.43 15.89 THE CALCULATZON PROCEDURES ARE BASED ON THE USE OF THREE-DZNENSZON MZNZMUM CURVATURE METHOD. i SPE .~-SUN DRZLLZNG SERVZCES ANCHORAGE ALASKA F- PAGE PRUDHOE BAY DRZLLZNG PBU/S-38Z 500292231000 NORTH SLOPE COMPUTATZON DATE: 12/ 8/92 DATE OF SURVEY: 12/07/92 JOB NUMBER: AK-MW-20091 KELLY BUSHZNG ELEV. = 69.00 OPERATOR: BP EXPLORATZON FT. ZNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTZCAL VERTZCAL RECTANGULAR COORDZNATES MD-TVD VERTZCAL DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DZFFERENCE CORRECTZON 0 ,00 -69,00 ,00 N ,00 E .00 69 69,00 .00 ,00 N .00 E .00 .00 169 169.00 100,O0 ,00 N .00 E ,00 .00 269 269.00 200,00 ,00 N .00 E .00 .00 369 369,00 300,00 ,01 S .01 E ,00 .00 469 469,00 400,00 .20 S ,29 E .00 .00 569 569,00 500.O0 ,40 S ,57 E .00 ,00 669 669.00 600,00 .40 S .56 E .00 .00 769 769,00 700.00 ,16 S ,20 E .00 .00 869 869.00 800.00 .08 N .17 W .00 .00 969 969,00 900.00 ,39 N ,47 W .01 .00 1069 1069.00 1000,00 ,71 N .77 W .01 .00 1169 1169.00 1100,00 ,74 N 1,07 W .01 .00 1269 1269,00 1200,00 .30 N 1,36 W ,01 .00 1369 1369.00 1300.00 ,14 S 1.64 W ,01 .00 1469 1469,00 1400.00 ,14 S 1.52 W .01 .00 1569 1569,00 1500,00 .12 N 1,17 W .01 .00 1669 1669,00 1600,00 ,38 N .81 W ,01 ,00 1769 1769,00 1700,00 1,06 N .26 W .02 .00 1869' 1869,00 1800,00 2,06 N .44 E .02 .01 1969 1969,00 1900.00 3.06 N 1.14 E .03 .01 2069 2069.00 2000.00 3,97 N 1,59 E .04 .01 2169 2169.00 2100,00 4.81 N 1.83 E .04 .00 2269 2269,00 2200,00 5,65 N 2.07 E ,05 .00 2369. 2369,00 2300,00 5,60 N 2,30 E ,05 ,00 2469 2469,00 2400,00 5,23 N 2,52 E .05 .00 2569 2569,00 2500,00 4,85 N 2,75 E ,05 ,00 2669 2669.00 2600,00 4,75 N 3.09 E .05 .00 2769 2769,00 2700,00 5,35 N 3,73 E ,05 .00 2869 2869,00 2800,00 5,94 N 4,37 E .06 ,OO 2969 2969,00 2900.00 6,54 N 5,00 E ,06 .00 3069 3069,00 3000,00 6,69 N 4.75 E .06 .00 3169 3169.00 3100,00 6,63 N 4.06 E ,07 .00 3269 3269,00 3200,00 6,56 N 3,36 E .07 .00 3369 3369.00 3300,00 6.54 N 2,72 E .07 .00 sPE ,"-SUN DRTLL'rNG SERVZCES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRTLLTNG PBU/S-38'r 500292231000 NORTH SLOPE COMPUTAT"rON DATE: 12/ 8/92 DATE OF SURVEY: 12/07/92 JOB NUMBER: AK-MW-20091 KELLY BUSHZNG ELEV, = 69,00 OPERATOR: BP EXPLORATZON ZNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTZCAL VERTZCAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR NORTH/SOUTH COORDZNATES EAST/WEST HD-TVD DZFFERENCE VERTZCAL CORRECTZON 3469 3469.00 3400.00 3569 3569.00 3500.00 3669 3669.00 3600.00 3769 3769.00 3700.00 3869 3869.00 3800.00 6,60 N 6.66 N 6,71 N 6,71 N 6.71 N 2.20 E 1.68 E 1.23 E 1.23 E 1.23 E .07 .07 .08 .08 .08 .00 .00 .00 .00 .00 3969 3969.00 3900.00 4069 4069.00 4000.00 4169 4169.00 4100.00 4269 4269.00 4200.00 4369 4369.00 4300.00 6.71 6.45 5.60 4.80 7.84 1.23 E 1.17 E .97 E .79 E 1.74 E .08 .08 .08 .08 .16 .00 .00 .00 .00 .07 4469 4469.00 4400,00 4571 4569,00 4500,00 4673 4669.00 4600.00 4776 4769.00 4700.00 4880 4869,00 4800.00 17,58 N 33.14 N 54.03 N 77.65 N 103,17 N 4.68 9,84 17,30 26,63 37.53 .6 2,0 4.4 7.6 11 .4 .54 1 .35 2.44 3.18 3.78 4984 4969.00 4900.00 5089 5069.00 5000.00 5195 5169.00 5100.00 5301 5269.00 5200.00 5409' 5369.00 5300.00 130.14 N 158.56 N 189.58 N 222.62 N 256.64 N 49.33 E 62.25 E 76.84 E 93.69 E 113.44 E 15.69 20.45 26.17 32.83 40.29 4.24 4.76 5.72 6.66 7.46 5517 5469.00 5400.00 5626 5569.00 5500.00 5736 5669.00 5600.00 5846 5769.00 5700.00 5957 5869.00 5800.00 291 327 365 404 444 .52 N .73 N .40 N .40 N .87 N 135.04 E 158.73 E 184.00 E 210.70 E 234.75 E 48.39 57.35 67.17 77.78 88.32 8.10 8.96 9.82 10.61 10.54 6068 5969.00 5900.00 6180 6069.00 6000.00 6292 6169.00 6100.00 6402 6269.00 6200.00 6512 6369.00 6300.00 485.96 N 530,14 N 571.50 N 609,54 N 647,87 N 258.44 285.76 312.24 337.74 364,51 99.00 111.69 123.10 133.09 143.49 10.69 12.69 11.41 9.99 10.39 6623 6469.00 6400.00 6732 6569.00 6500.00 6841 6669.00 6600.00 6949 6769.00 6700.00 7057 6869.00 6800.00 686,54 N 722.19 N 757.16 N 791.76 N 825.88 N 391,99 E 417.84 E 442.53 E 465.97 E 488.90 E 154.17 163,44 172,22 180.60 188.72 10.68 9.27 8.78 8.38 8.12 FT. SPE; -SUN DRZLLZNG SERVZCES ANCHORAGE ALASKA PAGE PRUDHOE BAY DR]:LLZNG PBU/S-38Z 500292231000 NORTH SLOPE COMPUTATTON DATE: 12/ 8 /92 DATE OF SURVEY: 12/07/92 JOB NUHBER: AK-HW-20091 KELLY BUSHZNG ELEV. = 69.00 OPERATOR: BP EXPLORATZON FT. ZNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTZCAL VERTZCAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDTNATES NORTH/SOUT'H EAST/WEST MD-TVD VERTZCAL DZFFERENCE CORRECTZON 7165 6969,00 6900,00 859,92 N 511,77 E 196,81 8,08 7273 7069,00 7000,00 893,96 N 534,65 E .204,89 8,08 7382 7169,00 7100,00 930,25 N 556,38 E 213.47 8.58 7491 7269,00 7200,00 967,16 N 577,99 E 222,23 8,76 7600 7369,00 7300,00 1004,89 N 599,60 E 231,28 9,04 7709 7469,00 7400,00 1043,18 N 621,63 E 240,60 9.33 7819 7569,00 7500,00 1081,92 N 643,99 E 250,15 9.55 7928 7669,00 7600,00 1120,64 N 667,42 E 259,92 9,76 8038 7769,00 7700,00 1159,62 N 691,06 E 269,82 9.90 8149 7869,00 7800,00 1199,15 N 715,21 E 280,03 10,21 8259 7969,00 7900,00 1239,37 N 740,11 E 290,65 10,62 8370 8069,00 8000,00 1281,32 N 762,26 E 301,34 10,69 8480 8169,00 8100,00 1323,16 N 784,08 E 311,91 10,57 8591 8269,00 8200,00 1365,97 N 806,31 E 322,94 11,03 8703 8369,00 8300,00 1410,03 N 828,47 E 334,44 11.50 8814 8469,00 8400,00 1452,92 N 849,97 E 345,36 10,92 8925 8569,00 8500,00 1495,01 N 872,16 E 356,10 10.75 9036 8669,00 8600,00 1537,94 N 894,25 E 367,15 11,04 9157 8777,57 8708,57 1584,42 N 919,89 E 379',43 12,29 THE CALCULATZON PROCEDURES USE A LZNEAR ZNTERPOLATZON BETWEEN THE NEAREST 20 FOOT MD (FROM MZNZMUM CURVATURE) POZNTS BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/12/93 T# 84266 BP/ PBU CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. S-38I CH 12/28/92 .. REF#124601 PFC GAMMA RAY (PERFORAT ATLAS Information Services Well Records ECEIVED jAN 2 5 1993 Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01-07-93 T# 84260 BP CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. D-04A~-/~ CH P-14 ~/~ CH S-33 ~-I~ CH S-38I~-~? CH x-14~ _~ CH 12/28/92 REF#l14983 12/30/92 REF#124604 12/31/92 REF#l14986 12/31/92 REF#124605 12/29/92 REF#124603 12/29/92 REFill4984 PRODUCTION LOGGING INJE COLLAR LOG (PERFORATING PRODUCTION LOGGING INJE PFC GAMMA RAY; PERFORAT PFC GAMMA RAY; PERFORAT CASING COLLAR LOCATOR(T ATLAS ATLAS ATLAS ATLAS ATLAS ATLAS Information Services Well Records CEIVED dAN 2 .5 1993 .~,Iaska 0ii & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 12/29/92 T# 84185 BP/PBU CH & OH TAPES W/LISTINGS Enclosed is your copy of the materials listed below. questions, please contact BP Well Records at (907) CH/TDT-P ~ ~-~--o/ FIN 10/22/92 #1 11047.00-11842.50 1600BPI API#500292220399 9210->TP# 8181.50- 9667.00 16¢0BPI API#500292231000 9211->TP# 9395.00-10~08.00 1600~,~ APr#50029206~o01 9212->~,# If you have any 564-4004. SCH REF#92632 SCH REF#92721 ATLAS REF#5760.01 Information Control Well Records · IVED dAN 0 ~ 1995 Alaska Oil & Gas Cons. Commission Anchorage COMPLETION DATE i'Z-- ! ~1 ! ~7_. CO. CONTACT' check off or list data as it is recci~d.*list recciYed date for 4~?. if no~ required I'i'st as NFl 407 l* ~'-1,1'7[q~ drillin9 hist0. W~' .u-ey! o ! ~ilt..ts' o I ~0,. dcscriptio4~¢ cored inte~a~s ~ore analysis ~ d~ ditch intcwpls digital data i i i ~ i i i LOG TYPE RUN INTEFlVALS SCALE NO. (to the nearest foot~ {inchll00'J ,, ......... i 7] i ii i i 111 I ~l I I I I I Ii I I I I I I I I 131 I .... I ~4) I 17} i ii i i i i i i i i i i i ALASKA OIL AND GAS CONSERVATION CO~I~IISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 November 20, 1992 Michael Zanghi Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit S-38i BP Exploration (Alaska), Inc. Permit No. 92-127 Sur. Loc 1643'SNL, 1670'EWL, Sec. 35, T12N, R12E, UM Btmhole Loc. 5167'SNL, 2626'WEL, Sec. 26, T12N, R12E, UM Dear Mr. Zanghi: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman BY ORDER OF THE COMMISSION dlf/Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Depar~men~ o£ Environmental Conserva~£on w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25. OO5 !la. Type of work Drill [] Red rillr-JJlb. Type of well. Exploratory[] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration- KBE = 68.8'feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. 0. Box 196612. Anchora~Te. Alaska 99519-6612 ADL 28257 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 2o AAC 25.o25) 1643' SNL, 1670' EWL, SEC. 35, T12N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 5260' SNL, 2676' WEL, SEC. 26, T12N, R 12E S-38i (24-26-12-12) 2S 100302630-277 At total depth ,9. Approximate spud date Amount 5167' SNL, 2626' WEL, SEC. 26, T12N, R12E 11/20/92 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and'rVO) property line . . ADL 28258- 2652' Tee[ S-9- 25'@ 2750'MD feet 2560 9643' MD/9217' TVD[eet 16. To be completed for deviated wells 17. Anticipated pressure (s~ 20 ,~c 2s.o35 Kickoff depth ,~2¢sfeet Maximum hole angle 25 o Maximum sudace 3330psig At total depth (TVD) ,~800'/4390psi9 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 30" 20" 91.5~ H-40 Weld 80' 32' 32' 110' 110' 450 # Poleset 16" 13-3/8" 68# L-80 BTC 2869' 31' 31' 2900' 2900' 1030 sx CS 111/730 sx CS Ii 12-1/4" 9-5/8" 47# L-80 NSCC 9176' 30' 30' 9206' 8821' 957 sx Class "G" 8-1/2" 7' 26# L-80 NSCC 587' 9056' 8685' 9643' 9217' 185 sx Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured dep, t~. Tru¢.~ Vertical depth Structural i-~ !~, i(~ Conductor ~'°' ~' '~ ~ Surface Intermediate !",~:""~t~ -'t ~'~ ~',~ '~_~ ,~., ~ ~, ,,~,~¢-, Production Perforation depth: measured true vertical '20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis l-I Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify~at~ng is true and correct~it~e best of my knowledge Si~ned '-. Drillin9 Engineer Supervisor Date ( ' Commission Use Only Permit Number '~API number IApproval d~) ISee cover letter ~ 2. -/-2. ,~ 15 O- ~ 2- ~-- ~ :2_ Z/~ I / / /,~., "~/? Ifor other requirements Conditions of approval Samples required [] Yes j~l No Mud log required []Yes ~ No Hydrogen sulfide measures [] Yes .J2]' No Directional, survey required ~ Yes [] No Required working pressure for BOPE [] 2M; 1-13M; ~]hM; 1-110M. 1-115M; Other: Origina~ Siuned"' By by order of Commissioner ~ne comm,ssion Date Approved by David W. ~ohnston Form 10-401 Rev. 12-1-85 Submit in triplicate WELL PLAN Well' LOCATION: S-38 Surface: Target: T.D.: Injector [24-26-12-12] 1643 FNL, 1670' FWL, Sec. 35, T12N, R12E 5260 FNL, 2676' FEL, Sec. 26, T12N, R12E 5167' FNL, 2626' FEL, Sec. 26, T12N, R12E PBU ESTIMATED START: NOV 20, 1992 OPR. DAYS TO COMPLETE: 21 (17 days drilling, 4 days completion) CCt~RACTOR: Nabors 28 E MAX ANGLE/SECT COURSE/KOP/BUILD/MAX DEP: 25 deg/N29.2E/4268'/2.0/2011' Estimated Ground level elevation is 36.8' AMSL. KB to ground level elevation is 32'. Item TVD(BKB~ MD(BKB) Mud Wt. 20" CONDUCTOR 8 0 8 0 8.5 13-3/8" SHOE 2900 2900 9.1 TOP UGNU SANDS 3 6 6 9 3 6 6 9 9.1 SEABEE 5269 5291 9.8 KUPARUK 6744 6914 10.2-10.5 9-5/8" SHOE 8821 9206 SAG RIVER SANDSTONE 8 8 21 9 2 0 6 9.0 - 9.5 TOP SADLEROCHIT 8 9 4 5 9 3 4 3 9.0 - 9.5 TARGET 8990 9392 9.0-9.5 TOTAL DEPTH 9 21 7 9 6 4 3 9.0- 9.5 CASING PROGRAM: Hole Csg Wt Grade Conn L~n_oth TCp Btm 30" 20" 91.5# H-40 WELD 80 32 110 16" 13-3/8" 68# L-80 ErIC 2869 31 2900 12-1/4" 9-5/8" 47# L-80 NSCC 9176 30 9206 8-1/2" 7" 26# L-80 N93C 587 9056 9643 COMPLETION: Tubing: ~ 5-1/2" 17# L-80 LTC-M 8977 29 9006 GLMs: 6-5-1/2" x 1-1/2" with 5 dummies and I RP shear(2800 psi) in top station Packer: Baker 9-5/8" x 5-1/2" Baker set at 9552' or +/- 50' above Top of liner Isolation Pkr: 7" x 4-1/2" w/ 4-1/2" tail assy w/ X & XN nipples, L-80 R ECE V D open Hole- Cased Hqle 12-1/4" Hole' None 8-1/2" Hole: DIL/CNL/GR/SP/SDT, Optional: LDT/GR, RFT CBT/CET IN 7" AND 9-5/8" before running tubing ^~ch0rage" No gyro is planned. S-38 Conventional November 11, 1992 17:15 Page 5 PROPOSED DRILLING AND COMPLETION S-381 Procedure PROGRAM , . . MIRU drilling rig. N/U diverter and function test same. Drill 16" hole to surface casing point. Run and cement surface casing. Nipple up BOPE and function test same to 5000 psi. PU 12-1/4" BHA and RIH. Test casing to 3500 psi for 30 minutes. Drill 10' of new hole and perform leak off test. . . Drill intermediate hole to intermediate casing point. MU and run 9-5/8 casing string and cement as per well plan. mud. Bump cementing plug with 6o RIH and drill 8-1/2" hole through reservoir to TD. . RU and run e-line logs. 8. MU '7" liner on 5" Dp. RIH to TD. Cement same. excess cement from wellbore. POOH. Set liner hanger and packer. Circulate 9. MU casing scraper & clean out 7" liner. 10. RU e-line and run cement bond Icg through liner and bottom of 9-5/8" csg. Set 7" isolation packer on e-line. 11. Run 5-1/2", L-80 and packer assembly with SSSV. Freeze protect with diesel. Test tubing and casing to 3500 psi. 12. NU tree and test to 5000 psi. Release drilling rig. ° Anticipated BHP: ° Maximum Anticipated Surface Pressure: ° Planned Completion Fluid: 3600 psi @ 8800' TVD SS 2800 psi 8.6 ppg filtered sea water Notes: a. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.003. b. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/ft). c. Based on previous logs on S Pad, no potential productive zones are anticipated above 3669' TVD (Ugnu). d. No potential hazardous levels of H2S are anticipated in this well. ,.,ohs. Oor~r,~ission Anchora~e S-38 Conventional Injector Drilling Problems & Concerns: It was recently determined that the liner cement jobs on R-31, R-31, and R-25 exhibit channeling and/or poor cement bond Icg results. Each will likely requires CTU squeezes. The importance of liner (and casing) reciprocation and cement displacement rate cannot be over emphasized. A copy of the S-pad data sheet has been delivered to 28E. A review of drilling problems has been completed and are described as follows: Bridges in surface hole have occured at 500' and 2000'-2200'. Tight hole and swabbing have been noted. Hole washouts and the related high volume of gravel etc have caused cuttings handling problems. The Tertiary/Cretaceous injection interval (3876' - 5600' tvd) is overpressured by +/-125 psi. A mud weight of 9.5 to 9.7 ppg should be used through this interval to prevent salt water incursions. S-33 experienced gas cut mud as shallow as 3841' md/tvd on 10/9/92. The mud weight was cut from 9.6 to 8;9 ppg. No flow was experienced. The mud weight was raised to 9.9 ppg and no additional gas was noted. S-3 had oil shows at +/-4000' tvd and 10.1 ppg mud was used to drill this interval. S-3 also experienced gas cut mud in the Kuparuk interval(6700' - 6800' tvd) and 10.5 ppg mud was used. Weight up to 10.2 ppg minimum before drilling Kuparuk interval. Tight hole problems are common in the Jurassic shales starting below the Kuparuk. Mud weights are typically up to 9.9 ppg or higher as required to control the Kuparuk. Mud fluid loss (less than 6 cc) help to stabilize shales. The 9-5/8" casing must be centralized through the Kuparuk to maximize isolation(details on cementing page). The Sag has been accidentally penetrated with 9.9 ppg mud weights with no problem. However, S-37 experienced partial lost returns while drilling the Shublik interval with 9.0 ppg mud. LCM was used to successfully slow/stop loss. The possibility of lost circulation does exist. S-15 set intermediate casing with 60' of shale open above the Sag. This hole interval was lost while attempting to drill out with 9.0 ppg mud. There should be no problem if the casing point (Sag River) is properly chosen. The Sag is normally drilled with 9.0-9.5 ppg mud. Lost circulation has been noted, independent of mud weight.. The Shublik drills slowly and may be highly fractured. High torque and differential sticking are common. The mud weight should be kept at 9.0-9.5 to help minimize the potential for lost circulation. The Sadlerochit is normally S-38 Conventional November 11,1992 N0V 2 ,992 Alaska 0JJ & Gas Cons. C0rr~missior~ 17:15 AI]ch0rage Page 6 ANNULAR INJECTION The S-37, S-33, and S-36 surface annulus is available for injection at present. Fluids can also be injected at the central CC-2 injection facility. AOGCC has informed PB Drilling that only associated fluids from drilling operations can be pumped down the surface x intermediate annulus-ie: completion fluids cannot be pumped. CUTTINGS DISPOSAL Plan to haul all surface cuttings and surface gravel by cement truck to ball mill at CC-2. Plan to haul all intermediate cuttings by super sucker to ball mill at CC-2. Do not RU cuttings handling unit at rig. FREEZE PROTECTION The 5-1/2" tubing along with the 5-1/2" casing annulus will be freeze protected using gas. The 13-3/8" x 9-5/8" annulus must be fully displaced with dry crude after the well is completed. CLOSE APPROACHS & SHUT-INS Note near well proximity of other S pad wells. The PE's have been requested to perform the following' S-9 (producer) 25' to 2750' MD. Close SSSV and set tail plug until drilling well surface casing is set. S-32 (producer) 36' at surface. . Close SSSV until drilling well surface casing is set. .... " L Oil & Gas Cons. Uoi~missior, Anchoraga S-38Conventional November 11, 1992 17:15 Page 7 MUD PROGRAM' Well S-38 The mud program for this well shall follow the new Mud Policy. The following are the recommended mud parameters. MUD SPECIFICATIONS- SURFACE HOLE Surface: Casir~g point: Mud Weight: ppg 8.5 - 9.5 8.5 - 9.5 Funnel Viscosity sec/qt ,,-300 <1 00 YP Ibs/100ft2 40 - 60 20 - 40 10 sec Gel Ibs/100ft2 30 - 60 15 - 20 10 rain Gel Ibs/100ft2 60 - 80 20 - 30 pH - 8.5 - 10 8.5 - 10 APl Fluid loss mi/30 min 15-25 15-25 Hardness mg/I < 200 <200 MUD SPECIFICATIONS- INTERMEDIATE HOLE Surface casing shoe to Top of Sag River Sandstone: LSND Gel/Water System Mud Weight ppg Yield Point lbs/1 00ft2 10 sec Gel Ibs/100ft2 10 min Gel Ibs/100ft2 APl Fluid Loss mi/30 min pH -- Hardness m g/I 9.5-9.8 To to the LCU 10.2-10.5 thru Kuparuk to Casing Point 10- 15 5-10 10 - 20 <15 through Kuparuk (6800' tvd) <6 in Jurassic Shales below 6800' tvd 8.5 - 10.0 NC-no control MUD SPECIFICATIONS-PRODUCTION INTERVAL: Watered back mud system used in intermediate hole. Mud Weight ppg 9.0- 9.5 Yield Point Ibs/100ft2 8 - 13 10secGel Ibs/100ft2 5 - 10 10 rain Gel Ibs/100ft2 7 - 15 APl Fluid loss mi/30 min pH -- Hardness m g/I t r 6.0 - 8.0 (fluid loss lowered to below 6 cc prior to entering K-shales 8.0 - 9.0 < 4000 The mud salinity should be compatible with the Reservoir logging program. The mud should be run at less than 3500 ppm chlorides. S-38 Conventional November 11, 1992 17:15 Page 8 Prudhoe Bay Drillin~ S-Pad Well' #S-38I vERTICAL VIEW SCALE 500 ft. ~ DIVISION REFERENCE: WELL HEAD R.K.B. EL,gVATION (89,0' ~BOVE SEA IZ'fEL) BA~E PERMAFROST 13.375 OD, 0 ~29.0~ MD, 2900 UGNU ZONE 4A START OF B~LD BUD. Z) RATE: 2.00 DES/100 PT TOP SEABEE ENP OF BU~ 6769 7000-- 7500-- 8000-- 8500-- 8821 886~ 8945 8990 9081 9110 9164 9300 KUPARUK/PUT RIVER 870 IKRU/'L~U 18~17846 1885 1906 19~ 2012 I I 1 500 1000 1500 9.625 OD. 0 9208 RD. I~?,1 TVD TOP SHUBL]K TOP SAD. TARGET °dG[NAL OWC ~C 7~ DE~ 2000 2500 HORIZONTAL VIEW SCALE 200 ft. ~ DIVISION REFERENCE' WELL HEAD 2000 SURFACE LOCATION: 29.27' ASP-Y: 5,979.855.01 ASP-X: 619,832.05 k 7/ 9.6250?, O 9206 MD. ,8~ TARGET LOCATION: ASP-Y: 5,981.532.04 ASP-X: 620,737.03 / BOTTOM HOLE LOCATION: / ASP-Y: 5,981.625.17 ,,~ ASP-X: 620.707.27 8000 - 29.27' / 7000 - 29.2T 5000- 29.27' 13.37,5 OD, O 2900 ~D. 2900 'iSrD --1800 --1600 TVD --1400 ~1200 --i000 --800 --600 --400 --200 200 200 0 200 400 600 800 1000 1200 1400 · Alaska 0il & aao Sons. Anchorage CRITICAL POINT DATA MD Inc R.K.B. £LEVATIDN 0 0.00 BASE PERMAFROST 19440.00 UGNU ZDN~ 4A 36690.00 START DF BU[L~ 4268 0.00 TOP SEABEE 5291 20.45 END OF BUILD 5518 25.00 KUPARUK/PUT6914 ~5.00 [KRU/LCU 6942 25.00 TOP SAG/CSG. PT 920625.00 TOP SHUBLIK9251 25.00 TOP SAD. 9343 25.00 TARGET 9392 25.00 ORIGINAL OVC 9493 25.00 Z3 9525 25.00 ZEC 9584 25.00 TOTAL DEPTH9643 25.00 AZI TVD North 0.00 1944 0.00 3669 0 0 o.oo 4268 o o 29.27 5269 158 88 29.27 5479 234 131 29,27 6744 749 420 29.27 6769 759 425 29.27 8821 1594 893 29.27 8862 1610 903 29.27 8945 1644 922 29.27 0990 1662 932 29.27 9081 1699 953 29.27 9110 1711 959 29.27 9164 t733 972 29.27 9217 1755 98~ VERTICAL SECTION PLANE' 29.27° File' S-36IWP Prudhoe Bay Drillin~ S-Pad Well' #S-38I File' S-36IWP Travelling Cylinder - Normal Plane Reference Well - S-38IWP TVD' 0 - 9217 ft. Interval, 50 ft. All Directions Rel to True North 33O. O' 300 270 s32 240 210 300' 180 150 120 3O' lC)C) slO 6O' S-37MWD 27O' 9~ s12 slga sll S-- 24ff S-36 I~ sO6 120' sO9 s29 210' sO? s30 CLOSEST POINTS Wellpath Slot Distance Direction Ref MD Ref TVD sO5 S-05 177.67 204.33 5164.56 5150.00 sO7 S-07 234.80 244.35 2050.00 2050.00 sO8 S-08 140.11 269.48 2300.00 2300.00 s09 S-09 25.64 257.04 2750.00 2750.00 sl0 S-10 69.37 92.52 2550.00 2550.00 sll S-II 148.08 79.80 2850.00 2850.00 s12 S-12 295.25 90.94 50.00 50.00 sl2a S-12A 284.98 91.12 0.0O 0.00 s29 S-29 108.53 269.92 650.00 650,00 s30 S-30 248.44 238.07 3650.00 3650.00 s31 S-3I 217.09 270.65 900.00 900.00 s32 S-32 38.84 89.09 50.00 50.00 S-33MWD S-33 153.27 258.86 2300.00 2300.00 S-361 WP S-36 107.98 158.28 5431.74 5400.00 S- 37MWD S-37 252.27 91.02 0.00 0.00 180' s05 150' Alaska Oil & Gas Cons. Commissior~ Anchorage Smith International, Inc. Travelling Cylinder Report Computed by the Sii Win-CADDS System Normal Plane Method Page Date: 11/6/9' REFERENCE WELL: Prudhoe Bay Drilling Prudhoe Bay S-PAD S-38! S-36!WP TVD, N/S and E/W are measured from the WELLHEAD Wettpath Slot Distance sO1 S-01 914.80 sO1r S-O1R 900.35 sO2 S-02 744.61 sO3 S-03 688.73 sO4 S-04 580.80 sO5 S-05 177.67 sO6 S-06 359.87 sO7 S-07 234.80 sO8 S-08 140.11 sO9 S-09 25.64 slO S-10 - 69.37 sll S-11 148.08 s12 S-12 295.25 s12a S-12A 284.98 s13 S-13 404.92 s14 S-14 515.00 s15 S-15 832.70 s16 S-16 899.16 s17 S-17 1103.73 slTa S-17A 1103.52 s18 S-18 1169.48 s19 S-19 792.16 s20 S-20 649.62 s21 S-21 657.28 s22 S-22 875.66 s23 S-23 725.72 s24 S-24 505.89 s25 S-25 543.10 s26 S-26 416.78 s27 S-27 436.90 s28 S-28 397.57 s29 S-29 108.53 s30 S-30 248.44 s31 S-31 217.09 s32 S-32 36.84 s-33mwd S-33 153.27 S-36 !WP S-36 107.98 S-37MWD S-37 252.27 Closest Points Direction Ref MD Ref TV1) 270.89 50.00 50.00 268.62 2450.00 2450.00 258.92 3450.00 3450.00 270.67 1300.00 1300.00 270.59 1300.00 1300.00 204.33 5164.56 5150.00 250.92 4100.00 4100.00 244.35 2050.00 2050.00 269.48 2300.00 2300.00 257.04 2750.00 2750.00 92.52 2550.00 2550.00 79.80 2850.00 2850.00 90.94 50.00 50.00 91.12 0.00 0.00 90.92 100.00 100.00 90.92 2050.00 2050.00 290.40 4350.01 4350.00 278.71 4550.46 4550.00 239.71 2700.00 2700.00 239.71 2700.00 2700.00 234.99 0.00 0.00 256.51 4100.00 4100.00 247.97 4701.65 4700.00 270.62 2700.00 2700.00 270.86 950.00 950.00 270.76 1550.00 1550.00 315.79 4100.00 4100.00 272.30 2450.00 2450.00 243.89 4905.24 4900.00 271.09 1400.00 1400.00 270.69 2250.00 2250.00 269.92 650.00 650.00 238.07 3650.00 3650.00 270.65 900.00 900.00 89.09 50.00 50.00 258.86 2300.00 2300.00 158.28 5431.74 5400.00 91.02 0.00 ' 0.00 Gas loons, Oommissior~ /mchorag6 13-3/8" SURFACE CASING CEMENT PROGRAM - BJ Services CASING SIZE: 13-3/8", 68# CIRC. TEMP 38°F LEAD CEMENT TYPE: Cold Set III ADDITIVES: retarder WEIGHT: 12.2 ppg APPROX #SACKS: 1030 YIELD:1.92 ft$/sx THICKENING TIME: 4:30 hrs MIX WATER: 10.5 gps TAIL CEMENT TYPE: Cold Set I! ADDITIVES: as required WEIGHT: 14.9 ppg APPROX #SACKS: 480 YIELD: .96 ft3/sx THICKENING TIME: 4 hrs MIX WATER: 3.89 gps. TOP JOB CEMENT TYPE: Cold Set II ADDITIVES: retarder WEIGHT: 14.9 ppg APPROX #SACKS: 250 YIELD:0.96 ft3/sx MIX WATER: 3.89 gps SPACER: 75 bbls fresh water ahead of lead slurry. CENTRALIZER PLACEMENT: 1. Run one(l) bow type centralizer per joint for the first 20 joints. 2. Place the.centralizers in the middle of each joint with a stop collar. 3. Run two bow type centralizers inside the conductor pipe on stop collars. CEMENT VOLUME: 1. Lead slurry to surface w/100% excess. 2. Tail slurry volume 480 sx 3. Top job volume 250 sx. V *, ':' Gas Cons. 6omrnissio~ Anchora.r.:te S-38 Conventional November 11, 1992 17:35 Page 13 9-5/8" INTERMEDIATE CASING CEMENT PROGRAM- BJ Services CIRC. TEMP: 130° F SPACER: 50 bbls Arco Spacer, weighted 1 ppg above mud current mud weight. LEAD CEMENT TYPE: CLASS G ADDITIVES: 2.0% A-2 + 0.5% Gel + 0.7% R-18 + 1 ghs FP-6L WEIGHT: 12.0 ppg YIELD: 2.40 ft3/sx MIX WATER: 14.2 gps APPROX #SACKS: 657 THICKENING TIME: 5 hrs TAIL CEMENT TYPE: CLASS G ADDITIVES: 1% FL-20 + 0.1% CD-31 + 0.1% R-1 + 1 GHS FP-6L for 3-4 hrs thickening time. WEIGHT: 15.8ppg YIELD: 1.15ft3/sx MIX WATER: 5.00 gps APPROX #SACKS: 300 THICKENING TIME: 4 hrs CENTRALIZER PLACEMENT: 1 Turbulator centralizer per joint on the bottom 500' of 9-5/8" casing ( 12 required ). 1 turbolator centralizer per joint from 200 above to 200 below the Kuparuk interval (6714' to 7142', 11 required ). One turbolator centralizer (7-3/4" x 9-3/8") on first two joints inside 10-3/4" surface casing shoe (2 required). OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 10-12 bpm. Batch mix tail cement - perform fluid loss test. Fluid loss should be 40 cc or less. CEMENT VOLUME: 1. Lead G neat slurry to 500'md above top of Ugnu with no excess. 2. Tail G slurry to 1000' md above casing point with no excess. 3. 80' md 9-5/8", 47# capacity for float joints. NOTE: The intermediate casing string should be isolate¢)f[0m.¢t ,[r~eti~rj~~us interval. S-38 Conventional ,,.,, ;~;. Gas Oot',.s. Oorcr¢issiOr' Anchorage November 11, 1992 17:49 Page 16 7" PRODUCTION LINER CEMENT PROGRAM - BJ Services CIRC. TEMP 1400 F. Bottom Hole Static Temperature = 226 degrees F at 8800' SPACER" 50 bbls Arco preflush + 1% S-400 . CEMENT TYPE: CLASS G ADDITIVES' 0.8% BA-10 + 0.6% FL-32 + 0.2% CD-30 + 0.3% A-2 + 0.35% R-1 + 1 ghs FP-6L WEIGHT: 15.7 ppg YIELD:1.1 8 ft3/sx MIX WATER: 5.03 gps APPROX #SACKS: 185 THICKENING TIME: 4.5 hrs total Note: Ensure that a thickening time test is performed that simulates the shut down time incurred while rotating off of the liner. Note gellation tendencys ( if any ) of slurry when consistometer is re-started after shutdown period - additional retarder may be required - consult w/ cementer. CENTRALIZER PLACEMENT: Run 2 turbolators per joint in open hole, 1 per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS' Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss should be 4000 or less. Displace @ 8-10 bpm. LINER CEMENT VOLUME' , , Open hole + 30% excess + excess for surface volume lost (adjust if a caliper Icg is run and it indicates severe washouts). 7", 26# casing capacity below landing collar. 150' liner lap 200' of cement on top of the liner in the 9-5/8" casing. l~ncho.%}a S-38 Conventional November 11, 1992 18:04 Page 20 S-38 Casing Design SURFACE CASING 13-3/8" 68#/FT K-55 & L-80 BTC CASING BURST COLLAPSE K-55 3450 1950 L-80 5020 2260 PBYS (#) 1069000 1556000 TJYS (#) 1300000 1585OO0 Burst Pressure Calculation Burst rating based on shutting in the well on a gas kick equivalent to the LOT (14.0 ppg) at the surface casing shoe. Worst case will be in the K-55 casing, which has no back up gradient. LOT (ppg) TVD (FT) SIPR~URE 1 4 2900 2111 Burst S.F. I .63 Collapse Calculation Collapse rating based on losing returns until the fluid level is below the surface casing shoe Mud weight behind the surface casing is 9.5 ppg Mud Wt. (ppg) TVD (FT) Collapse press 9.5 2900 1433 Collapse S.F. 1.58 Tension Calculation Based on full string weight in mud Casg Wt. (#/ft) MD (FT) 68 2900 PBYS Tension S.F. 6,34 Mud Wt. 9.5 ppg TJYS 7.71 String Wt. (#) 168567 S-38 Casing Design Production Casing 9-5/8", 47#,L-80,NSCC Casing GRADE BURST L-80 6870 COLLAPSE PBYS (#) TJYS (#) 4750 1086000 1161000 Burst Pressure Calculation Burst rating based on have a tubing leak on top of full column of fluid Worst case will be at the surface, which has no back up gradient. SFFP 342O Burst S.F. 2.01 Collapse Calculation Collapse_ rating based on annulus being evacuated due to gas lift Mud weight behind the casing is 10.2 ppg - _ _ Gas Grad. Mud Wt. (ppg) TVD (FT) (psi/ft) Collapse press 10.2 8821 0.1 3797 Collapse S.F. I .25 Tension Calculation Based on full string weight in mud Casg Wt. (#/ft) MD (FT) 47 9206 PBYS Tension S.F. 2.97 Mud Wt. 10.2 TJYS 3.18 String Wt. (#) 365227 S-38 Casing Design PRODUCTION LINER 7", 26#,L-80,NSCC Casing GRADE BURST L-80 7240 COLLAPSE PBYS (#) TJYS (#) 5410 604000 667000 Burst Pressure Calculation Burst rating based on formation pressure on top of 9.7 ppg fluid Fluid wt (ppg) back up (ppg) Burst Pressure SlTP 9.7 9.5 351 2 3420 2.06 Burst S.F. Collapse Calculation Collapse rating based on annulus being evacuated due to gas lift Mud weight behind the casing is 10.2 ppg Mud Wt. (ppg) 10.2 Collapse S.F. Gas Grad. TVD (FT) (psi/ft) Collapse Press 92OO 0.1 3960 1.37 Tension Calculation Based on full string weight in mud Casg Wt. (#/ft) MD (FT) 26 587 Mud Wt. String Wt. (#) 10.2 12883 Tension S.F. PBYS TJYS 46.88 51.78 NABORS 28E DIVERTER SYSTEM ARCO ALASKA, INC. FILL-UP LINE R~ER , FLOWUNE 1 10" B/d I: VALVE 10" BALL VALVE J ONLY ONE VALVE OPE~ AUTOMATICAl 1 Y WHEN THE ~RTER CLOSES. THE SECOND VALVE WlLL REMA/N CL~ UNLESS CON--NS REQUIRE THE USE OF THE SE~D VENT LINF_ THE SECOND VENT UNE VALVE CAN BE OPe_NED USING CONTROLS LOCATED AT THE ACCUMULATOf:L THIS IS ~ IS A VARtANOE FROM 20AAC:25.0:3& 10" VENT LINE RESERVE PFI' 10" VENT UNE NABORS 28E DIVERTER SYSTEM ARCO ALASKA, INC. F]LLAJP UNE 1 R~ER FLOWUNE DIVERTER ONLY ONE VALVE OPENS AUTOMATICAl ! Y WHEN THE DfVERTER CLOSES. THE ,S~=(:X:)f, iD VALVE W1LL REMAJN CLOSED UNLESS CONDf33ONS REQUIRE THE ~ OF THE SECOND VENT UNF_ THE SECOND VENT LINE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS THIS IS A VAR~NCE FROM 20AAC25.035. RESERVE PIT 10" VENT LINE 10" VENT UNE DfVERTER UNES D~CHAFIGE 100 FT. FROM RIG IGNITION SOURCE. ALL TURNS ARE TARGETED TEE& t TO DISTRIBUTION TO PIT CAVI~M UNIT I SHAKER SCREEN ..... CAVI~M UNIT 2 TO FLARE .,,,j . CHOKE MANIFOLD TRIP TANK 170 BBL VOLUME TANK 137 B8L EO. : VOLUME TANK 180 BBL WATER 87 8BL FILL LINE ; . ~UTI DITCH MUD HOPPERS & MIXING PUMP8 .SAND- TRAP 4 BBL C 15H T'RI~UGI~ PIONEER MK I TO PIT 131BBL 81BBL DEGASSING TANK DESILTER NA~ORS DEGA88ER DR1LCO 8EEFLOW TO STAND PIPE & KILL LI~E SUCTION 117 BBL NABOR$ DRILLING LTD RIG No. 28E MUD SYSTEM SURFACE FACILrrlE$ TOTAL ACTIVE SYSTEM: 800 BBL TOTAL SURFACE CAPACITY : 970 BBL MUD PUMPS SUCTION 134 BBL Page 1 State: Alaska Borough: Well: S-38i Field: Prudhoe Bay St, Perm ~ 92-I 27 Date 11/17~92 Engr: M. Minder S-381CSG.×LS casing Interval Interval size Bottom Descriptionescriptionescripfion Tension Top Length 1A 13.375 2900 31 2874 2A 9.625 8804 32 9722 3A 7 9207 8690 683 4A 0 0 0 0 5A 0 0 0 0 6A 0 0 0 0 7A 0 0 0 0 8A 0 0 0 0 9A 0 0 0 0 10A 0 0 0 0 Lbs Grade Thread Lbs 68 K-55 BTC 0 47 L-80 NSCC 0 26 L-80 NSCC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Mud Hydraulic Wieght Gradient ppg psi/fl 1B 9.5 0.494 2B 10.2 0,530 3B 10.2 0,530 4B 0.0 0.000 5B 0.0 0.000 6B 0,0 0.000 7B 0.0 0.000 8B 0.0 0.000 98 0.0 0.000 1 OB 0.0 0.000 Maximum Minimum Pressure Yield psi psi BDF 3330 3450 1.0 3330 6870 2.1 3330 7240 2.2 0 0 #DIVIO! 0 0 #DIV/O! 0 0 #DIVI0! 0 0 #DIV/0! 0 0 #DIV/O! 0 0 #DIVi0! 0 0 #DIV/O! Tension Strength K/Lbs K/Lbs 1C 195.432 1069 2C 456.934 1086 3C 17.758 4C 0 5C 0 6C 0 7C 0 8C 0 9O 0 10C 0 TDF 5.47 2.~ 604 34.01 0 #DIVi0! 0 #DIVt0! 0 #DIV/0! 0 #DiViO! 0 #OiV/O! 0 #DIV/O! 0 #DN/0! Collapse Collapse Pr-Bot-Psi Resist. CDF 1433 1950 1.361 4670 4750 1.017 4883 5410 1 .lOC 0 0 #DIVi0I 0 0 #DIVi0! 0 0 #DIV~! 0 0 #DIVIO! 0 0 #DIVI0! 0 0 #DIV/'O! 0 0 #DIV/O! ~ - 1,27 3~ "-* CHECK LIST FOR NEW WELL PERMITS '" ITEM APPROVE DATE ( 2 ) Loc ~/°r I///_~ ~ ,, '[2~hru 8] ' ' e (3) Admin [~}r' , ~2///J/~)_ 9. .... [9 Thru 13] ' 10 ilo s i2. 13. (4) Casg ,I/-19-ez_ i4. [1~ ~hru 22] 15. (5) BOPE ~ ?/-Iq-9 ~ [23 thru 28] Company / NO RE~ARKS 1. Is permit fee attached ............................................... 2. Is well to be located in a defined pool .............................. 3. Is well located proper distance from property line ................... 4. Is well located proper distance from other wells ..................... 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated & is well bore plat included ................... Is operator the only affected party .................................. Can permit be approved before 15-day wait ............................ YES Does operator have a bond in force .................................. /~ Is a conservation order needed .... i .. ~) Is administrative approval needed. . . Is lease nLmber appropriate .......................................... ~ Does well have a unique name & number ................................ . ... Is conductor string provided ......................................... ~ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. ~ Is enough cement used to circulate on conductor & surface ............ ~ Will cement tie in surface $ intermediate or production strings ...... ~ Will cement cover all known productive horizons ..................... ~ Will all casing give adequate safety in collapse, tension, and burst. ~ Is well to be kicked off from an existing wellbore ................... ~ Is old wellbore abandonment procedure included on 10-403 ............. A//~ Is adequate wellbore separation proposed ............................. ~ '" Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... ~ Are necessary diagrams & descriptions of diverter & BOPE attached .... /~_ Does BOPE have sufficient pressure rating -- test to~OOO psig ..... ~ Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... ~ 16. 17. 18. 19.. 20. 21. 22. 23. 24. 25. 26. 27. 28. (6) Other ,~/~_ r/'///~/~;_-- 29. '[29 th u' 3i'] 30. 31. (7) 32. (8) Add1 ~~~//-/~-~ 33. FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions D~esented... Name and phone ntrnber of contact to supply weekly progress data ...... Additional requirements ............................................. geo 1 ogy' DWJ~ RPC/~//~'~ eng i ne. er ing' BEW~D~--~/[ff rev 08/18/92 jo/6.011 INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE / / o .-I -r Z ~0 U~ '-I Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER , ****************************** *------- $CHbLfMBERGER ****************************** 8OROUGH API NUMBER RgFE~E~CE ~0 BP EXPLORATION $-38I (24'26-12-12) PRLIDHOE BAY NORTH ShOPE ALASKA 50-029-223~0~00 g~721 RECEIVED JAN 0 4 199~ Alaska 0ii & Gas Cons. Commission Anchorage MICJ OFILM bis Tape VerificatioD L/sting SChlun~bergerA!asKa Con~put~.ng CeDter t~-DEC-199~ 13~t5 PAGE= **** REEl., H£ADgg SgR¥ICE NA~-~E : gl2IT DATE : 92/~/1~ ORIGI~ : FLIC R~EL NA~5 : 927~ 1 CONTINUATI(}~ ~ : PREVIOUS REEL : CO~gE~;T **** TAPE HEADER **** SERVICE MA~E : EDIT DATE : 92112118 ORIGIN : FLIC TAPE NAME : 92721 CONTINUATION # : ~ PREVIOUS TAPE : COMmEnT : BP EXPLORATIO~:i~,PRUDHOg BA¥,S-38I (24-26-12-12),50-029-223!0'00 PRU~HOE BAY UNIT OPEN HOLE WIRELI~E LOGS AP1N~MBER: OPERATOR: LOGGING COMPANY: TAPE CREATION [)ATE: JOB DATA JOB NUMBER: [,O~G!NG ENGINEER: OPERATOR WIT~ES$: SURFACE LOCATION SECT!OM: FNL: EEL: ELEVATIOn(ET FR[)k ~SI, O) KELLY BUSHING: DFRPICK FLOOR: GROU~!D WELL CASING REC~D IST STRING 2~.~D STRTNG R U F 1 92721 D, WAiR~iER ~ CHAF~BER~ S-38I_ (24-26-12-t2) 50-029-22310 SCHLU.BERGER WEb. h SERVICES I~-DEC-92 RUN 2 RUN 3 35 ~.643 i670 70, O0 68.50 35.80 (F!P E N H!.!bE CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) RECEIVED JAN 0 4 1995 Alaska 011 & Gas Cons. Commission Anchorage LIS Tape Verification Listing Schlumberger AlasKa Come, urinE Center i8-DEC-1992 13:15 3RD STRING PRODUCTION STRING TOOL STRING (BOT-TOP)~: DITE SLTT GR-TCC-A~S. RAN A 2' HOLE FINDER ON BOTTO~ OF DITE. SP DRIFTING IN SOME PLACES. ~OST LIKELY DUE TO WELDING ON PaD F~O~ MINI ~ODULE $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT ,001 SERV!C~ : FLIC V~R$ION : O0iAo7 DATE I 92112118 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES All tool stri~s: DePth shifted and clipped curves:; all runs merged; no cased hole data, DEPTH INCREMENT 0.5000 FILE SUMMARY PBU TOGL COD~] START DEPTH STOP DEPTH G 9599.0 9198.0 BCS 9619.0 9224.0 DTE 9648.0 9227.0 $ B~SFLINE CURVE FOR SHIFTS: GR CURVE SHIEST DATA (~EASURED DEPTH) .......... EQUIVALENT UNSHIFTED DEPTH----- ..... BASELINE DEPT~ sCS DTE SP .......... .............. 88.0 8 ~6~88.0 888~8,5 ~5s5.0 9595.5 9574.0 9574.5 9565.0 9564.5 9563.0 9563.5 9558.0 9559.0 9556.5 9556.0 9547.0 9547.0 9546,5 9546,5 9545.5 9546.5 LIS Tape Veriflcation Listtno Scblumberoer Alaska Compt~ttng Center 1~-DgC-1992 1.3:15 9534.5 9532.0 9531.5 9519 5 9508 0 9499 5 9480 5 9478 5 9445,5 9426,5 9424,5 9424,5 9410,0 9363,5 9342,0 9333,~ 93!6. 93~5 5 9307:0 9289.5 9288,5 9242,0 9241,5 9225,5 100,0 !00,0 IO0,O MERGED DATA SOURCE PBU TOOL CODE $ 9533.0 94~1.,5 9445.5 9427,0 9315.5 9307.5 9243.0 I0!,0 9536,0 9533'0 9425.0 9363 0 9342 0 9333 0 9315 5 9288.0 9242,5 9226.0 100,5 9519,5 9508,0 9499,0 9478.5 9424.5 9410.5 9288.5 99,0 PASS NO, MERGE TOP ~ERGE BASE THE DEPT}{ ADJUST~IEI~TS SHOWN ABOVE REFLECT DT TO OR, SFL YO GR (CARRYING ALL OTHER DTE CURVES) AN[) SP TO OR. THE ~R. TENSIO~ CUgVES AND MUD TEMPERATURE AND MUD RE$~ST~¥IT¥' CURVES WERE ~OT CLIPPED AT TH~ CASING SHOE DUE TO THE CASED HOLE GR NOT RE~CHING THE BOTTO~ OF THE CASING SHOE, THIS NAS DONE TO PROVIDE ~ CONTINUOUS LIS FCRMAT DATA PAGE: ** DATA FORMAT SPECIFICATIOM RECO~D ** ** SET TYPE - 64EM ** TYPF ~EPP 1 66 0 2 66 0 LIS Tare Verification Li, stir~o Schlumberger Alaska Co~,put~nq Center 18-!)~C-1992 13:15 PAGE~ 2 3 73 4 66 5 66 e 73 7 65 8 68 0,5 9 65 FT 11 66 !9 12 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 0 ** SET NAME SERV UNIT DEPT FT DT BCS US/F GR BCS GAPI TE~8 BCS LB TEND BCS LB iDPE [)TM I~PH DTE D~MM ILD DTE ILM DTE OHMN SFL DTE SP DTE MV TYPE - SERVICE API API APl API FILE ORDER # LOG TYPE CLASS MOD NUMB 599510 O0 000 O0 0 599510 O0 000 O0 0 1 599510 O0 000 O0 0 1 599510 O0 000 O0 0 1 599510 O0 000 O0 0 1 599510 O0 000 O0 0 1 599510 O0 000 O0 0 1 599510 O0 000 O0 0 1 599510 O0 000 O0 0 1 599510 O0 000 O0 0 ! 599510 O0 000 O0 0 ! MTEa DTE DEGF 599510 O0 000 O0 0 1 MRES DTE OHM~ 599510 O0 000 O0 0 1 DATA ** DFPT. 9656. 000 DT.BCS -999,250 T~!,!D RCS 544.748 IDPH,DTE -999 250 IL~:DTE -999,25u SFE.DTE -999:250 ~:S.[~,T~ o.~-57 DEPT, 960o,00o DT.BCS 93.200 TEND.BCS 548,41o IDPH.DTE 1,753 IL~.DTE 1.'132 SFL.DTE 4.117 NRES.DTE 0,a57 NUMB NUMB $I'ZE RE:PR PROCESS SAMP EBEM CODE (ME,X) ! 1 4 68 0000000000 1 1 4 68 0000000000 I 1. 4 68 0000000000 I ! 4 68 0000000000 I I 4 68 0000000000 i 1 4 68 0000000000 1 ! 4 68 0000000000 ! 1, 4 6S 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 1 I 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 GR.BCS -999.250 TEN$,BC8 IUPM.I)~E -999.250 ILD,DTE SP.!) E -999.250 MTEM.DTE GR.BCS -999.250 TENS.BC$ !~PH,DTg 1.754 ILD,DTE SP,DTE -19.~88 MTEM,DTE 3650,000 '999,250 183.325 3860,000 1,711 18~.325 LIS Tape Verification Listing Schlumberger Alaska Computing Center DMPT, 9500 o oo0 DT, BC$ TEN~ B C,_,q 574,592 !DPH. [)TE M~ES.DTE 0.867 DEPT. 9300.000 DT.BC$ TEND.DC$ 6~9.645 IDPH.DTE IL~.DT~ 5.553 SFL.DT~ M~ES.DTE 0.894 DEPT. 9200.000 DT BCS TEND.BCS 810.939 !DPH~DTE ILM.DTE -999.250 SFL.DTE ~ES.DTE 0,963 DEPT. 9198.000 DT.BC8 TEND.BCS 820.698 IDPH.DTE IL~.DTE -999.250 SFL'DTE gRES.DTE 0.963 ** END OF DATA ** 18-9EC-1992 13:15 84.367 GR.!~CS 4.229 IMPH.DTE 5.848 SP*DTE 87 G R t:t C $ I 1.0;/0 SP,DTF~ !09.563 GR.SCS 5.818 I~PM.DTE 7.057 SP.DTE 4 39.157 1:7 34.1 3 9 i 2~9 -56.373 !11.814 5.618 48 '215 -999.250 GS.BCS 57. 986 -999.250 I~PH't.)TE -999.:250 -999. 250 $P,I,)TE -999.250 -999.250 GR.BCS -999.250 IMPH.O. TE -999'250 SP'DTE TENS.BCS ILD.DTE MTEM.DT.E TENS.BC$ I LD. DTE MTEM.DTE TENS.BCS ILD.DTE MTE~'DTE TENS.BCS ILD.DTE MTEM.DTE TENS BC$ I D..'DTS ~TE~.DTE PAGE~ 3860.000 3860.0 ! 80; 2 · 87 o ,000 17i..269 3965,000 -999. 250 170,999 **** FILE TRAILER *~** FIL~ NA~E : EDIT .001 SERVICE : FLIC VERSION : O01A07 DAT~ ~lX REC SIZE : 1024 FILE TYPE : 1,0 LAS~ FILE **** FILE HEADER **** FILE ~Aag : EDIT .002 SFR'V!CE : ~L!C VERSION : Oo!Ao7 D~TE : 92/12/18 ~lX ~EC SIZE ~ 1024 FILE TYPE : LO LAST FILE : FILF HEADE~ FILE NIJ~6.F..R: ~ EDITED CASED HOLE ~Al,~.i PASS LIS Tape Verlflcation Listing Scbiumberger Alaska Comput.~ng CeDter 18-DEC-1992 ~3:15 Depth sh~fted and cl~,pDed curves for o~en bole logs run into casing, PASS NUMBER. 3 DEPTH' INCREMENT 0,5000 # FILE SUmmARY PBU TOOL CODE $ BASELINE CURVE FO~ SHIFT$~ GR,BCS CURVE SHIFT D.ATA (NEASU~ED DEPTH) PASS START DEPTH 9227,0 88888,0 9187 0 9171!0 9169 5 9154,0 100'0 $ STOP DEPTM 8183,0 2 ----------~QUIVAL~NT UNSMIFTED DEPTH---'------ GR 9:186,0 9170,5 9168,5 9154,5 1.00,5 T}'~E CASED HOLE GR ~AS FIRST DEPTH CORRECT TO THE OPEN HOLE OR IN THE OVERLAP SECTION AND A BLOCK SHIFT APPLIED TO THE RE~AINING G~ IN CASING. THE DATA WAS THEN CLIPPED, $ # LIS FORMAT f~ATA PAGE ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYP~] REPR CODE VALUE 1 66 0 2 66 0 ] 73 24 4 66 1 5 66 6 73 7 65 8 68 0,5 9 65 FT 11 66 42 12 6~ 13 66 0 14 65 FT 15 66 68 I$ Tape Verification chlum~erger AlasKa Computing Center i8-DEC-1992. 1]:15 PAGEI *$ SET TYPE DEPT FT 5995 GRCH aCS GAPI 5~95 T~NS BCS LB 5995 - CHAN ** CE APl API APl AP1 FILE NUM'B B SIZE PROCESS R ~ uOG TYPE CLASS ~OD NUMB SA~P ELEM CODE (HEX) 10 O0 000 O0 0 2 1 1 4 68 0000000000 10 O0 000 O0 0 2 1 1 4 68 0000000000 10 O0 000 O0 0 2 1 I 4 68 0000000000 TEND 5C$ LB 599510 O0 000 O00 2 I I 4 68 0000000000 .,~,:~ ~cs .'~.~, ~~o oo 000 oo0 ~ ~ , 4 ~ 0000000000 ~,~:~ ~cs .~'.5~9~0 oo 0o0 ~ ~ ~. ~ ~ 4 ~8 0000000000 ** DATA ** ~ES,B'DEPT' 9198,00(~ GRCH,8C$. ' i., 67,~1 TENS,BC$.. 4030,000 TEND,BC$ cs 0.9~ ~TE~ aCS lbS. DE~T 9!00,()00 GRCH,SC$ 65 7~2 TENS,BCS 4055 000 TEND,BC$ DEPT. 9000,000 GRCH BCS 59 657 TEN$,BCS 4095,000 TEND BCS MRES,BCS !,014 ~TE~:BCS 163:402 DEPT, 8900,000 G~CH.BCS 58 706 TENS.BCS 4040,000 TEND.BCS MRES,8CS 1,027 ~TE~.BCs 161~448 ....... DEPT. 8800,000 GRCH.BCS 55,729 TEN$,BCS 4015,000 TE~D.BCS ~RES..SCS 1,0~5 ~TE~.BCS 160,174 DEPT. 87a0,~00 GRC~..BCS 47 821 TEN$.BCS 39~5,000 TEND ~RE$.BCS 1,045 ~TE~'BCS 159~035 ' " ° DEPT. 8600,~00 G~CH.BCS q9,165 TENS.BC$ ~890,000 T~ND,BC~ ~ES,BCS 1..54 ~TE~,8C$ 157.696 DFPT. 8500,000 GRCH.gCS ~8,460 TE~!S.BC$ ]615,000 TENDoBC$ M~ES.BCS 1'067 ~TEg.3CS 156,094 D~PT. 8400.(,0O GRC~.BCS g2 108 TE~.~,S.~CS 3755 000 TEND 8CS SRES.BCS 1,078 ~TE~.8CS ! 4~629 ' ' D~PT, 8]00,000 GRCH,BCS 48.037 TENS.SCS 3655,000 TEND BCS MRES.BCS 1,090 MTE~,BCS 153.499 ' ° 820,236 852.899 868.709 918.554 932.780 913.498 880,297 797,630 841,843 812,018 Tame refill, cation Listing SchlumberQer Alaska computino Center DEPT. 8200.000 GRCH.BCS ~RES,BCS t.090 ~TE~.BCS DEPT. 8183.000 GRCH.BCS ~RES'BCS t.090 MTE~.BC$ ** END OF DATA ** i~-DEC-1992 i3~15 47.09I TE~$,BCS 152.833 3705.000 TEND.SCS 3860.000 TEND.SCS 841.,468 840,760 **** FILE TRAILER **** FILE NAME : EOIT .002 SERVICE : FLIC VERSION : 00!AD7 DATE : 92/12/28 ~AX REC SIZE : 1024 FILE TYPE : bO bAST FILE : **** FILE HEADER **** SERVICE : FbIC VERSION : O0!AO7 DATF : 92/12/18 M~X REC SIZE : ~.024 FILE TYPE : LO LAST FILE : FILE HE,DER FILE NUMBER 3 R~W OPEN HOLE MAI~! PaSS Curves and log Leader data for each run and tool string in separate files; Tool String #! fo Sadlerocnlt run presented first (~rimar¥ dept~ control string used to depth Shift the Sad!er interval) followed by files for o~her main pass strings per run, RUN NUMBER: 1 TOO[. STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SII~MARY VENDOR TOO[, CODE START DEPTH · 9599 0 BHC 9619:0 DTE 9248.0 $ LO~ HEADER DAT~ DATE LOGGED= SOFTWARE VERSION: STOP OMPTW g224.0 9224.0 9224.0 10-DEC-92 5C0-423 [ils Tape Ver],fication Schlumberger .Alaska ¢omPutJ, n..g Center PAGE{ Tiff LOG~ER ON TD DRILLER (FT): TD LOGGER(FT!,: TOP bOG INTEF~VAL BOTTCA~ LOG INTERVAL (FT)~ bOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTO~) VENDOR TOOL CODE TOO[, TYPE TEbE~.ETRY CARTRID' GR GAM~A RAY HOUSING GR GAM~A RAY CARTRIL~GE BHC BORENOLE CONP, SONIC BHC BORf~MOLE COMP, SOrbiC DTE PHASOR INDUCTION A I. DTE P~ASOR I~JDOCTI&N SONDE OPEN HOLE BI~~ SIZE DRILLERS CASI'NG DEPT}] (FT): DOGGERS CASING DEPTH (FT): BOREHOLE CONDITIO~)S ~UD TYPE: ~UD DENSITY (LB/G): :~UD VISCOSITY ($): ~UD PM: FLUID bOSS lC3){ ~AXIMO~ RECORDED TE~PERATUR~ (DEGF)~ R~SISTIVITY (OHMS) AT TENPERATURE (DfGF): MUD AT MEASURED TE~PERATURE ~UD AT BOTTO~ ROLE TENPERATUR~ MUD FILl'RATE AT MUD FILTRATE AT MUD CAKE AT MUD CAKE AT N~UTRO~ TOOL TOOL TYPE (~PITHER~AL OR THERMAL): MATRIX: 5{ATRIX DE~.~SI TY: HOLE CORRECTIO['~ (IN): 500 iO-DEC-92 12~0 lO-DEC-92 9650.0 96570 9224!0 9647 0 2400.0 AMS-AA 7~2 TCC-~ 281 SGH-K 53 SGC-SA 50 SbC-UA 136 SDS-WA 2001 DIC-EB 377 DIS-MB 379 8,500 9220 0 9~24~0 DSND 9.20 3~'90 . 6 3,000 3.280 2,800 66.0 66.0 66.0 2.71 TOOL STA~,~DOFF (IN) ~E~ARKS: ~O~L STRING (BO~-TOP): DITE-MLTT-GR-TCC-AMS. RAN 1,5" RUBBER STANDOFFS ON DiTE AMD BMC, RAN A 2' HOLE FINDER ON 80ITCM OF DITE. SP D~If~TING IN SO~E PLACflS, ~OST LIKELY DUE !O WELDING {lb PAD FROM ~INI gOOULE CONSTRUCTION. LIS Tape Verlficatlon Listln~ Schlumberger A].a. ska ComPutin~ Center $ FORMAT DATA 18-DEC-1992 13:15 !0 ** DATA FORMAT 6PECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE YALUE 1 b6 0 2 66 o 3 73 132 4 66 5 66 6 73 7 65 8 68 0,5 9 65 FT It 66 7 12 13 66 0 14 65 FT 15 66 68 !6 66 0 66 ** SET TYPE - CHAN ** NA~ SERV UNIT SERVICE API API APl AP1 FILE NUMB NUmB SIZE REPR PROCESS ID ORDER # LOG TYPE CLAMS ~OD NUMB SAMP ELEM CODE (HEX) DEPT FT 599510 O0 000 O0 0 3 ! I 4 68 DT BHC US/F 599510 O0 000 O0 0 ] I 1 4 68 TT1 B~C US 599510 O0 000 O0 0 3 1 I 4 68 TT2 BHC US 59951.0 O0 000 O0 0 3 I 1 4 68 TT3 BHC US 599510 O0 000 00 0 3 I 1 4 68 TTa BHC tis 599510 O0 000 O0 0 3 I ! 4 68 $P BHC NV 599510 O0 000 O0 0 3 1 1 4 68 GP BHC GAPI 599510 O0 000 O0 0 3 1 1 4 68 TENS BHC LB 59951.0 O0 GO0 O0 0 3 1 1 4 68 MTE~ BHC DEGF 59951~ O0 000 O0 0 ] I ! 4 68 ~ES BHC OHN~i 599510 O0 000 O0 0 3 1 I 4 68 hTEN BHC LB 599516 O0 000 O0 0 3 1 1 4 68 CIDP DTE MMH~ 599510 O0 000 O0 O 3 1 1 4 68 IDPH DTE OP~ 599510 O0 000 O0 0 3 ! 1 4 68 CI~P DIE ~iHO 599510 O0 OOO O0 0 3 1 1 4 68 I~PH DTE OHMH 599510 O0 OOO O0 0 3 ~ 1 4 68 CILD DTF ~MHO 599510 O0 000 OO 0 3 ~ ! 4 68 ILO DTE [)N~ 599510 O0 000 O0 O ] ! 1 4 68 CIL~ DTE ggHO 599510 O0 000 O0 0 3 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 5IS Tape veri. ficatioD L~stiDo SchlumberGer Alaska Con, putin~ Center 18-DEC-t992 13:15 11 NAME SERV [INIT $~'RVICE AP ................ I A ID ORDER # LOG TYP IbM DTE OHMM 599510 IDOF DTE 599510 00 INOF D?E 599510 O0 IIRD DTE M~HO 599510 0O IIXD DTE MMHO 590510 O0 IIRM DTE MMHO 5995~0 00 IIX~ DTE MMHO 5995~0 O0 SFLU DTE OHMM 59951.0 00 SP DTE ~V 599510 00 G~ DTE GAPi 599510 00 TENS DTE LB. 599510 00 ~TE~ DTE DEGF 599510 MRES DTE OH~ 599510 O0 HTEN DTE LB 599510 O0 Pi A E CbA$S M 000 O0 0 o00 O0 000 O0 000 O0 0 OoO O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 0 000 O0 O 000 O0 0 000 O0 0 000 O0 3 1 I 4 68 0000000000 3 1 I 4 68 0000000000 3 1 I 4 68 0000000000 3 I 1 4 68 0000000000 3 1 1 4 68 0000000000 3 I i 4 68 0000000000 3 l I 4 68 0000000000 3 1 I 4 68 0000000000 3 1 1 4 68 0000000000 3 I 1 4 68 0000000000 3 I 1 4 68 0000000000 3 1 I 4 68 0000000000 3 1 I 4 68 0000000000 ** DATA ** DEPT, 9667,000 DT.BHC TT3,BMC 573.600 TT4,BHC TENS,BHC 2075,000 gTE~,B'HC CIDP,DTE 336,814 IDPM,DTE C!LD.DTE 333.020 ILD,DTE IDOF,DTE 0,000 !~4OF.DTE IIRM,DTE 378.063 IIXM.DTE GR,DTE 22,02~ TENS.DTE HTEN,DTE 20.190 90,400 39@,000 1.83.325 2.969 3.003 0 000 36:222 2075.0O0 TTI,BHC GP,BHC MRE$,BHC CILM,DTE IIRD,DTE SFLU,DTE MTE~.DTE 579 200 -60 000 0 857 406 750 407 603 278 105 6 367 183.325 TT2 .BHC GR,BHC LI.rEN BHC IMPH,DTE ILM,DTE IIXD.DTE SP,DTE MRES. DTE PT. 9600.000 DT.BHC DTT3,BHC 596 400 TT4 BHC T~:NS.BHC 3860.000 MTEM.BHC CIDP,DTE 568.548 IDPH.DTE CILD DTE 576 788 ILD,DTE IDQF:DTE 0[000 IMQF,DTE IIR~.DTE 527 043 IIX~.DTE HTEN.DTE 95.100 418,400 183.325 1,759 1.734 0.000 56,771 3860.000 TTI,BHC SP.BHC MRES.BHC CIMP,DTE CILM,DTE IIRD,DTE SFLU,OTE MTEM,DTE ~93 200 39:.000 0 857 5781047 574 391 456 783 4 335 183.325 TT2,BMC GR.BHC HTEN,BHC IMPH.DTE ILM,DTE IIXD.DTE SP.DTE MRE$.DTE DFP? 9500.000 PT BHC T~3:BHC 555,600 TT4;BHC TENS,BHC 3860.000 MTEM.OHC CIDP.DTE 240,117 IDPH.DTE CILD.DTF 244.534 II.D.DTE IDOF.DTE O.OOO IgOF.DTE IIR~.DTE 203,136 IIX~.DTE GR.DTF 39,~54 TENS,DT~ HTEN.DTE 574.592 ~2.100 3B3.200 !81.793 4.i65 4.089 O.O00 23.031 3860.000 TT1.BHC SP,BHC MRES,BHC CIMP,DTE CIL~,DTE IIRD.DTE SFLU.DTE MTE~,DTE 55~ 2O0 . 2161879 216.250 209.225 12 383 181:793 TT2,BHC GR,BHC HTEN,BHC IMPH.DTE ILM.DTE IIXD.DTE SP.DTE MRE$.DTE 021 294 '48,000 ..857 410,000 18.762 548 410 1.:730 1.741 91,089 -19.000 0'857 ,1~4 574.592 4'611 4'624 30.403 60.188 0.869 5IS Ta~e v~rification Listtnq $chlumberoer Alaska ComDutinq CeDter 9400.000 OT BBC DEPT'BHC' 574 000 TT4...BHC TT 3, . . ' ' .... TEh'S.BHC 3860.000 M'rF~ B~C CIDP nT~7 99.95~ · I D P H. Il) T E CILD.DTE 101,427 !LD.DTE IDOF, DT~ O. 00() !MOF,DTE I!R~.DTE 1©6.3~6 I!X~.DTE G~.DT~ 34.173 TENS.DTE }tTMN.DTE '744.7 ~6 DEPT, 9300,000 DT. BHC TT~.MBC 645,600 TT4. BHC TENS.BBC 3945,000 CIDP,DTE 1.73,889 IDPH.D.TE C!LD.DT~ 174. 349 ILD, DTE IDOF.DTE 0.000 IMOF.DTE IIR~.DTE 175,923 IIXM,DTE GE,DIE I 1 I i 814 TENS, DTE ~TE~1. DTE 629,645 . DEPT, 9200.000 DT.BMC TT3 BHC 392,80() TT4.BHC TEN$:BHC ') "00o ~TE~4.BHC 4(20. .... CtDP.DTE 62,554 IDPH, DTE CILD. DTE 65. 665 ID'O[, DTE 0,000 IMOF,DTE IIR.~,DTE -125,772 IIXM.DTE G~.DTE 57,986 TENS.DTE HTE~ DTE 810,939 DEPT, 9143,000 DT.BHC TT3.BDC -9q9.250 TT4,BHC TENS.DSC -999,250 MTEM.BNC CIDP.OTE -999,250 IDPN.DTE CIBD.DTE -999.250 ILD.DTE IDOF DT~.. -999,2K0 I~OF.D..ET II~:DT~ -999,250 I!×M'DTE G~.DTE -999,250 TENS'.DTE }~TEW.DTE -999.250 DATA **** FILE FILE NAgE SERVICE VERSION DaTE ~a× EEC SIZE FILE TYPE LaST FILE TRAILER **** EDIT ,003 FLIC PO~h07 92112118 1024 13:15 ~8.800 TTI,BBC 400.000 SP.MHC 1~0.237 ~RES,;g~C 10.005 C!~P,DTE 9.859 CILM,DTE 0.000 IIRD.DTE !2.075 SFLU.DTE 3860.000 MTEM,DTE 56,900 TTI'BHC 2Sl,600 SP'BHC 171..269 ~RE$,BHC 15,986 CIMP,DTE 15,229 CILM,DTE 0.000 IIRD,DTE !86.349 SFLU,DTE 4020.000 MTE~,DTE -999.250 TTI.BHC -999.250 SP,BHC -999.250 MRE$,BMC -999 250 C!MP DTE -g99[250 CIb~iDTE -99g~250 SFLU.DTE -999.250 MTE~,DTE 0.800 109,.507 112,462 90,.371 10.737 1.80.2~7 611, 200 17 .895 189.:911 ! 49. 941 175.870 387.600 -I16.500 0'963 -13 738 58.276 9700,000 ~71,269 -999.250 -999.250 -999 250 -999i250 -999250 -999.~50 -999.250 -999.~50 TT2.BMC GR.BHC IIXD.DTE SP ~ DTE MRES,DTE TT2..B~C G~,BHC HTEN,BHC IMPH.DTE IL~.DTE IIXD.DTE SP.DTE MRES.DTE TT2.BHC G~.BHC MTEN..BHC iMPH.DTE IL~,DTE IIXD.DTE SP.DTE ~RES.DTE TT2,BHC GR.BHC HTEN.BHC IMPH.DTE IL~.DTE IIXD DTE SP:DTE MRES.DTE PAGE: 389.200 34,173 744'716 9.132 8.892 9,054 . 866 455 600 11814 29 645 5 685 5 350 6,946 47.,750 0.893 272'400 57 986 810 939 1950 000 1950 000 '227 236 ~96 500 0.963 '999,250 '999,250 '"999'250 '999,250 '999 250 -999!250 -999 250 -999,250 12 ~IS Tape Yeriftcation Listl. no Schlumberger Alaska Con~putin~ Center 18-DEC-1992 13:15 PAGE: 13 FILM NAME : EDIT ,004 SERVICE : FLIC VERSICN : O0~A07 DATE : 92/!2118 ~A× ~MC SIZE : 1024 FILE TYPE : LO I.,~ST FILE FILF HEADE~ RAW OPE~-! HOLE REPEAT PASSES Curves and lo~ header dats ior each pass, tool string, and run in separate RUN NU~,ER: *' i .... TOOL STRING NUHBEP: 1 PaSS DEPTH INCREMENT: 0.5000 FILM VENDOR TOOL CODE START DEPTH MMC 9619.0 ~TE 9~48.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSIONS TI~E CIRCULATION ENDED: TIME LOGGEP ON BOTTOm: VD DRILLER (FI): TD LOGGE~(FT): TOP LOG INTEPVAL (FI): ~OTTO~ LOG INTERVAL fFT): LOGGING SPEED (FPHR): STOP DEPTH 9224,0 9224,0 9224,0 TOOL STRING (TOP TO BOTTOm) VMMDOR TOOL CODE TOOL TYPE GR BHC DIE DTE $ TELEMETpy CARTR{DGE GA~A RAY HOt, SING GA~A RAY C~RTP~DGE BGREHOb~ COMD, SONIC ~OREHOLE CO~P, SONIC DHASOR INDUCTION CART, DHaSOR INOUCTION SONDE BCREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 5C0-423 5OO ~210 9650.o 9657 0 9 4:o 9647.0 2400,0 lO-DEC'g2 1 O-DEC-92 TOoL NUMBER TCC-B SGH-K 53 SGC-SA 50 SLC-UA SL$-WA 2001 DIC-EB 377 DIS-MB ~79 5IS Ta~e Yer!f~catlon L~tln~ Schlumberger AlasKa Co.'~putlng Center 220,0 DRILLERS C~$'I~G DEPT}~ (FT): q 9224.0 LOGGERS CA$IN~ DEPTH (FT): BOREHObE CONDITIONS MUD TYPE: LSND ~UD DENSITY ([,B/G): 9,20 ~[ID VISCOSITY (S): 36,00 ~UD PH: 9,:90 FLUI9 5OS$ (C3): 6 ~0 :gAXI~U.M RECORDED TEMP~RATURE (DEGF): I~-0 RESISTIVITY (ON~M) AT TE~PERAT~RE (DEGF): MUQ AT gEASURED TEMPERATURE (~T)= 3,000 66'0 MUD AT BOTTO~ HOLE TE~{PE~ATU~ ~UD FILTRATE AT (MT): 3,280 66'0 ~UQ FILTRATE AT MUD CAKE AT (MT): 2,800 66.0 ~UD CAKE AT NEUTRON TOOL TOOt TYPE (EPITHER~AL OP THERMAL): ~TRIX: LIMESTONE ~TR!X DENSITY: 2.71 HOLE CC)~RECTIO~i (IN): TOOL STANDOFF (!N): ~E~ARKS: COL S~ ING (BOT-TOP): rITE SLTT-GR-TCC-A~$ RAN ~.~ RUBBER STANDGFFS G~ DITE AND RAN A 2' ~OLE FINDER ON BOTTOg OF DITF. SP DRIFTING IN SO~E PLACES. SOST LIKELY DUE TO WELDING ON PAD FROM ~INI ~ODUL~ CONSTPUCTiON, bis FORMAT OATA 14 ** OATA FORMAT SPECIFICATION ~ECORD ** ** SET TYPE - 64Eg ** TY~ P. REPr~ CODE VALLtE I 66 0 2 66 0 3 73 13~ 4 66 1 5 66 6 73 7 65 8 6B 0.5 9 65 FT 11. 66 7 bis Tape Verlficat!om Listing Schlumberger ~lasKa Computing Cemter i8-0EC-1992 13:15 15 TYPE REPD CODE VALUE !3 66 0 14 65 FT ~5 66 6~ 16 66 0 66 ** SET TYPE - CHAN ** N~F SERV UNIT S~RVICE APl APl AP1 AP1 FILE NUMO NUMB SIZE REPR PROCESS ID ORD.~R # LOG TYPE CLASS ~OD NUmB SA~P ELaM CODE (HEX) FT 599510 O0 000 O0 0 4 ~ t 4 68 0000000000 DMPT DT BMR TT1 BMR TT2 BHR TT3 BMR TT4 BMR SP BMR GR BHR T~NS BMR HTEN BNR CIDm DTR IDPM DTR C!MP DTR I~P~ DTR CILD DTm ILO DT~ C!L~ DTR IL~ DTR IDQW DTR I~OF DTR II~D DTR IIXD DTR I~X~ DT~ $~bU OT~ Sp DTR GR 9T~ TENS OTR MTE~ DTR ~ES ~TR UStF 599510 O0 US 599510 O0 US 599510 O0 US 599510 O0 US 5995~0 O0 MV 599510 O0 GAPI 5995~0 O0 LB 599510 00 DEGF 599510 00 ONMM 59g510 O0 b~ 599510 O0 MgHO 5995~0 O0 OMM~ 599510 O0 ~HO 599510 O0 OH~i~ 599510 O0 MMHO 599510 O0 O~ 5995~0 O0 ~uHO 599510 O0 ON~~ 599510 O0 599510 O0 599510 O0 M~HO 599510 O0 ~HD 599510 O0 ~HO 599510 O0 KMHO 590510 O0 OH~ 599510 O0 ~v 599510 OO GAP! ~995~0 O0 LB 5995~0 00 DEGF 599510 O0 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 000 O0 0 4 000 ,00 0 4 000 O0 0 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 OOC O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 OOO O0 0 4 000 O0 0 4 000 O0 0 4 OOO O0 0 4 000 O0 0 4 000 O0 0 4 000 O0 0 4 I I 4 68 0000000000 1 I 4 68 0000000000 ! i 4 68 0000000000 I 1 4 68 0000000000 i ! 4 68 0000000000 1 I 4 68 0000000000 1 ! 4 68 :0000000000 1 1 4 68 0000000000 1 I 4 68 0000000000 I I 4 68 0000000000 1 1 4 68 0000000000 t ! 4 68 0000000000 l 1 4 68 0000000000 1 ! 4 68 0000000000 1 ! 4 68 0000000000 1 I 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 1 I 4 68 0000000000 1 I 4 68 0000000000 ! i 4 68 0000000000 ! 1 4 68 0000000000 1 I 4 68 0000000000 ! I 4 68 0000000000 ! 1 4 68 0000000000 1 1 4 68 0000000000 I 1 4 68 0000000000 ss 9,,o oo ooo oo o 4 4 oooooooooo "TE'~' D.~.~ .b~. ~..g.!.510 O0 002 O0 0 4 ! ! .4 6' 000000.2.000 m~mm~m~lm,~m ~m~mmm~m, t~lm~m mlmlmmm,m,~em mmm~mm~mml) lmmmmmmm~Immmm~lmml~lmmmemmmlm~'mmlm~ mmmm~mmmmlmmmm~mmllmm, mlm4mmmmt mmmmlm ** D~TA ** LIS TaPe veriflcat!on Llstino Scblumberqer AlasKa Computin0 Center ~pT 9663.5OO DTT3]SH~ 574.800 TTq. B~R TEN$.BH~ ~690.000 NTE~.BH~ CIDP.DT~ 325,665 IDPH.DTR CILD.DT~ 322.4~4 IL~.DTR /DQW.DT~ 0.000 IMQF.DTR IIR~.DTR 377.042 IIXM.DTR GP.DTR 27,~3 TEMS.DTR MTEN.DT~ 220.352 D~PT 9600.000 DT,BHR TT3:BH~ 594.800 CiDP.DTR 567.515 IDPH.DTR CILD.DTR 576,930 ILD.~TR IDOF.DT? 0.000 IIR~.DTR 5~9.907 IIX~ DTR GR DTR I9 775 MTEM.DTR 559.280 DFPT 9500,o00 DT CIDP.DT~ 238~733 ILD.DTR 243.239 IbD,DTR DO.F.DTR 0.000 · IIX;a.DTR G~.D'T~ 39.289 TENS.DTR HTE~.DT~ 580.510 D~P~. 0400.000 OT.~a TT~.BH~ 574.800 TT4.BHR T~S ~ 3960.00o ~T~,.S~ CIDP~DTR 98.432 IDPH,DTR CIUD,DTR 100,280 ILD,DTR IDOV,DT~ 0,000 I~QF,OTR iI~..DTR 103.651 IIXa. DTR G.,DTa 33,811 TENS.DTR HTEN,DT~ 716.6~4 DEPT. 9300.000 DT.BH~ TT3.BHR 650.000 TT4.B~R TFNS.BM~ 3895 000 ~TEM B~R C![)D.DT~ 175:741 IDPg~DTR CILD DTR 174.~]5 ILD.DTR !DOF~DT~ 0.000 I~OF.DT9 ITR~.DTR 176.403 II×~.DTR GP.DT~ 1!1.425 T~NS,DTR HTEN.DTR 635.677 D~P~'. 920o.000 DT.BHR TT3.gMR 393.200 TT4.BHR TENS.BH~ 3990.C00 ~TE~.ODR CIDP.DTR 62.~91 !DPg{.DTR 18-DEC-1992 13:~5 90.700 TTI.iBHR 396~400 SP'BHR 1~0.973 ~RE$'BMR 3,071 CI~P,DTR 3,!02 CiL~,DTR 0,000 IIRD,DTR 31.062 SFLU, D'.RT 2690,000 ~TE~'DTR 94 ~5o 42~600 SP.BHR 18o.973 1.762 CI~P,.DTR 1.7~3 CIL~,DTR 0.0 0 IIRD.DTR 5~.0~ SFLU.DT~ 3835.0 ~TE~.DT~ 82,500 38~.800 S 180.127 ~RE$,BHR 4'189 CI~P,DTR 4,tii CIb~,DTR 0.000 IIRD'DTR 19.066 5FLU.DTR 3850,000 MTE~.DTR 88 900 400i400 178 578 10 159 CI~P.DTR 9.97~ CIL~.DTR 0.O00 IIRD.DTR 6.437 $FbU.DTR 3960.000 110.600 TTI.OHR 438.400 SP,B~R 173.410 ~RES.BMR 5.690 CI~P.DTR 5.726 CILM,DTR 0.000 IIRD,DTR 6,234 $FLU,DTR 3885,000 MTEM,OTR ~0,400 0.000 0.872 405.604 269, 6,61! 180.973 589.00~ -~4-37 ~s72 577.632 456.585 4,143 180'.973 .563 0.~886 220.480 !~.6.31 lB .127 70 0 0.901 105.451 109.549 89.585 11.127 178.578 648 000 0.946 172.704 187.427 150.295 ~.208 173.410 47.500 TT1.BHR 388.000 283,200 '$P.BHR -180.375 167.94~ ~RES,~NR t,001 16.079 CIMP,~T~ -118.098 TT2,BHR HTEN.BHR IMPH,DTR ILM,DTR IIXD,DTR SP.DTR MRE$,DTR GR.BHR HTEN.BHR IMPH.DTR ~ILM..DTR iIXD,DTR SP.DTR MRES,DT~ TT2'BHR GR~BHR HTEN,BHR IMPH'DTR ILM.DTR IIXD,DTR SP.DTR MRES.DTR TT2BHR "GR:BHR HTEN,BHR IMPH.DTR ILM.DTR IIXD.DTR SP~DTR MRE$ DTR TT2.BHR GR.BHR HTEN.BHR IMPH.DTR IL~.DTR IIXD.DTR SP.DTR MRE$.DTR TT2.BHR GR.BHR HTEN.BHR IMPH.DTR PAGE: 16 396,O00 ,465 2.460 53,157 -~0,000 0,872 0 80 74O 872 376,0 0 39,2~9 580,510 4~i536 2~::622644 6 389,200 33.811 716.634 9.483 9,128 7,153 -33.250 0,901 436.400 111,425 635,677 5.790 5,335 5.107 0,375 0.946 308.000 57.017 843.459 1950,000 bis Schlumberger Alaska Co.mmuting Center la-DEC-1992 13:15 PAGE: 17 CILD.DT~ 65.193 ILD.DTR I D (! ~ D T R 0.000 I ~40 F. D T 017 TENS. GP.DTR 57,459 MTEN.DTR 843. DEPT. 9140.000 DT.BHR TT3.BMR 999 250 TT4 BHR C~DP,DTR -999,250 IDPH,DTR CILD.DTR -999,25U IbO,DTR IDOF,DT~ -999,250 IMOF,DTR I!R~,DTP -999,250 IIX~,DTR G~.DTR -999.250 TENS.DT~ HTEM.DTR -999.250 15.339 CIL~,DTR 0.000 IIRD,DTR !83.596 SFLU.DTR 3990.000 ~TE~,DTR -999.250 TTi.BHR -999 250 SP.:SHR -999:250 ~RES.BHR -999.~50 CIMP.~T~ -999.~50 CIL~,DTR -999,~50 IIRDoDTR -999.250 SFLU.DTR -999.250 MTEM,DTR -129 854 ~5~:.OTa 57:9~0 II~.D,DTR 9700,000 SP.DTR t67,94~ ~RES,DTR -999.250 TT2.BHR -999.250 GR.BHR -999,250 MTEN.BHR -999.250 IMPH.DTR -999.~50 IL~.DTR -999.250 IIXD.DTR -999'250 SP.DTR -999.250 MRES.DTR ~950, ooo '999~50 '999 250 '999 250 999,250 :999'250 '999,~50 ** E~D OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT .004 SERVICE : ~bIC VERSION : 00!A07 DaT~ : 9211,2/18 MAX RFC SIZE : 1.024 FIL~ TYPE LAST FILE **** FILE MEADER **** F!LE NA~E : EDIT .005 S~RV!C~ : FL!C VERSION : 00la07 DAT~ : g2/1~/18 MaX RFC SIZE ~ 1024 FILF TYPE : LO LAST FILE : FILE H£ADER FIL~ ~UMBER 5 paw CASED HOLE MAIN PASS Curves and lo~ header data for open Dole logs run into casing. RUN NUMBER: 1 TOOt. STPING MUMBER: PaSS NUMBER: DEPTH INCREgE~!T: -.5000 FILF VENDOR TOOL CODE START DEPTH STOP DEPTH LIS Tape Verification [,ist~,na Schlumberger AlasKa Computing Center !8-DEC-199~ I3:!5 BAGEl # LOG HE~D~R DATA 9198.0 8183.0 GR DTE DTE $ DATE bOGGED: SOFTWARE VERS!O~J~ TIM~ CIRCULATION ENDED: TI~E [,OGGER ON BOTTOm: TD DRILLER TD LOGGER(FT): TOP bOG INTERVAL BOTTO~ LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE A(IXIGLI~RY MEAS,: MOD TELEMETRY CART~iDGE G~M~ RAY HOUSING GA~A RAY CARTRIDGE BO~EHOLE CO~P. SONIC BOREHOLE COMP, SONIC PHASOR INDUCTION C..R., DHAS~]R INDUCTION SO~DE 8ORENOLE AND CASING DATA OPEN MOLE BIT SIZE {IN): DRIt, LERS CASING DEPTH [PT): LOGGFR$ C~SIWG DEPTH (FT): BOPEHOLE CONDITIOhi$ ~UO TYPE; MUD DENSITY fl.,B/G): MU~, VISCOSITY (S) FLUID bO~S CC3) ~AX!MUM RECD}.:DED TEMPERATURE (DEGF) RESISTIVITY (OM~) AT TEMPERATURE (DEGF): ~UD AT ~EASU~ED TE~:PERATURE uUD AT BOTTOm4 MOLK TEuDEPATURE ~UD FILTRATE AT ~UD FIbTPaTE ~UD CA~K AT (~T): ~UD CAKE AT ~KUTRON TOOL TOOL TYPE [EPITHEP~AL OR THFR~Ab): MATRIX DENSITY: HOLE CORRKCTIO~ (I~): TOOL 10-DEC-92 5C0-42~ 50O 1210. 9650 0 9657i0 9~24 0 96.4 ° 10-DEC-92 10-DEC-92 ~M-A~ 712 TCC-B 281 SGH=~ 5] SGC-SA 50 8bC-UA 136 SL$-WA DIC-EB 377 DIS-HO 379 8,500 9220.0 9224.0 LSND 9,20 36,00 9,90 6 0 3,000 3,280 2.800 66.0 66.0 66.0 L!~ESTONE 2.71 LIS TaDe VerJ.,ftcation Schlt)mberoer Alaska Co~)uti ~n Center 18-D~C-lg92 13:15 ~EM~RKS: TO[i}L STRING (~OT-TOP): DITE-SLTT-G~-TCC-AMS. RAN 1,5" RUBBER BT~NDOFFS ON DITE AND BHC, RA~ A ~' HOLE ~INDER ON BOTTOM OF D!TE. SP DRIFTIng IN ~ . AC ~S~ ~GST LIKELY DUE TO WELbIN~G ON P~D FRO~ M~!NI ~ODUL:E CO~STRUCTION. LIS FDR~AT DATA 19 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64ER ** TYPE REP~ CODE VALUE 1 66 0 2 66 0 3 73 4 66 5 66 7 65 $ 68 0,5 9 65 FT 1~. 66 42 !P 68 13 66 0 15 66 68 ~6 66 0 66 ** SET TYPE - CHAN ** N~ 8FRV UNI~ SERVICE ~PI AP! API ~PI F!t,E NU~ NUMR SIZE ~EP~ PROCESS ID ORUER ~ LOG TYPE CLASS NOD NUMB SAMP EbEM CODE (HEX) ''''''''''''''''''~;~;'DFpT . 0 ....00''''''000 .... 00'''''''''''''0 5 .......... 1. 1 ''; ..... ;'8 .... ~'~'''''''0 00000 G~ CSG GAPI 599510 O0 000 O0 0 5 ~ i 4 68 0000000000 T~N$ CSG L8 599510 OO 000 O0 0 5 ! 1 4 68 0000000000 MPES CSG OH~ 599510 O0 000 O0 0 .5 1 1 4 68 0000000000 ~TE~ CSG DEGF 5905~0 O0 000 O0 0 5 1 ! 4 68 0000000000 HT~? CS~ 58 5995~0 O0 000 O0 0 5 ! 1 4 68 0000000000 ----------~-~-----------~--~------~-~------------~------------------------~----~-~---- bis Tame ver'~flcation bistin~ Schlumberger Alaska Computt..n6 Center DMPT. 9259,000 GN,CSG MTEP.CS~ 165,765 HTEM,CSG DEPT. 9200.fi!00 GR.CSG MTE~'CSG 165.965 ~TE~.CSG DEBT 9100,000 ~R CSG DEPT 000 ~TE~:CSG 3.4! 2 HT~i~N,CSG DEPT, 8900,000 GR,CSG ~TE~.CS~ 161,44~ MTEN,CSG DEPT. 8800.000 GR.CSG ~TE~,CSG 160,243 D~PT. 8700,000 GR,CSG MTE~'CS~ 159,035 DEPT 860(), 000 GR. CSG ~TE}~ :CSG 157 °696 MT~NoCSG DEPT, 8500.000 GR ~TM~,CSG !56,?~8 HTE'N,CSG DEPT 8400,0f~0 ~E~:CSG 154 563 HT~'CSG DEPT 8300.000 G~.CSG ~TE~:CSG ~53.632 · ~TE~ CSG D~OT. 8200.000 GR.CSG DEPT. 9!81.500 ~R.CSG ~T~u.CSG 15~.768 ~T~w. CSG ** ~:~ID OF DATa ** SErViCE VERSION D~TK ~n× RFC SIZE F?b~ TYPE LAST FILE TRAILER **** : EDIT .005 : Fl;lC : 0~07 : 1P24 13:15 71.570 TE~$.CSG 294..179 71,570 TFM$.CSG 810.494, 66.23! TENS,CSG 848. O24 61.969 TMN:S. C,~ G 873.585 ~ ~ CSG 52,78~ TE~S. 913.678 ' N 63,241 rE .S.CSG 927,886 45 7.~8 TEMS,CSG 898:856 T S.c O 822.013 61 0 2 TENS 50 577 41 474 T~NS, ..8G 2455.000 4030.000 4055'000 4095'000 4040.000 4015,000 3935"000 3900~000 36!5.000 3755'000 3905.000 3705.000 3860.000 ~RES.CSG MRES.CSG MRES.CSG MRES.CSG ~RES.CSG MRES,CMG MRES.CSG MREM'CSG ~RES,CSG MRMS,CSG MREM.CSG ~RE$.CSG MRES,CSG PAGE: 20 0'981 0'.981 0'990 1.014 1'035 1,~045 1~055 1.067 1~075 1.090 1o090 1°090 ~cblumberqer Alaska Co~.putinq Center .~. 8-DEC- ], 992 13:1.5 **** TAPE TPAILER **** SETRVICE NA~IE : EDIT DATE : 92/12/18 ORIGIN : Ft.~. I C TAPM ~}A~E : 92721 CO~TINUATIOM ~ : 1 PREVIOUS TAPE : CO~ENT : BP EXPb[~)RATIO~.~,PRUDHOE BAY,S-381 (~4-26-!2-12),50-029-223~0-00 **** REEL T~AILER **** SMRVICE NA~E : EDIT DATE : 92112/18 O~IGIN : FL!C REET~ NA~E : 92721 CO~TINUATIO~ ~ : PREVIOUS REEL : CO~EMT. : BP E×...LORATIO~," P PRUDHOE SAY,$-38I (24-26-~2-12),'50-029-22310-00~ PAGE~ 2!