Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-1957. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 18-11B Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-195 50-029-21181-02-00 19493 Conductor Surface Intermediate Liner Liner 8625 80 2462 2630 10922 6477 14825 20" 13-3/8" 9-5/8" 7" 4-1/2 8677 48 - 128 46 - 2508 44 - 2674 2525 - 13447 13015 - 19492 48 - 128 46 - 2508 44 - 2674 2525 - 8202 7848 - 8625 none 470 2670 4760 5410 8540 14825 , 16257 , 18717 1490 5380 6870 7240 9020 13458 - 19378 4-1/2" 12.6# 13Cr85 42 - 13017 8211 - 8641 4-1/2" HES TNT Perm , 12895 , 7755 No SSSV 12895 7755 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028321 , 0028302 , 0028307 42 - 7850 118 205 180 12234 602 1185 0 0 234 273 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 4:06 pm, Apr 18, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.04.18 15:50:59 - 08'00' Bo York (1248) DSR-4/24/25JJL 5/8/25 RBDMS JSB 042525 ACTIVITYDATE SUMMARY 3/9/2025 ***WELL FLLOWINGI ON ARRIVAL*** (DRIFT) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH DRIFT RUN TOOL TAG AT 8900' ATTEMP PASS MULTIPLE TIMES WITH OUT SUCCESFUL TOOL ONSURFACE COVER IN PARAFFIN JOB IN COMPLETE ***WELL S/I ON DEPARTURE*** 3/17/2025 T/I/O = 0/0/0 Assist Slickline Brush & Flush ( PERFORATING ) Pumped 150 bbls of 180*F DSL down TBG while slickline brushed. Following SL to next well. FWHP = 450/0/2 3/17/2025 ***WELL S/I ON ARRIVAL*** PUMPED & WORKED 2-3/8" BRUSH & 1.84" CENTRALIZER TO 13,500' SLM WHILE LRS PUMPED 150 BBLS OF HOT DIESEL(did not fall clean) RAN 10' x 1.56" DUMMY GUNS (1.72" rings) & 1.84" CENTRALIZER TO 13,500' SLM. ALL CLEAR ***WELL LEFT S/I ON DEPARTURE*** 3/21/2025 T/I/O= 300/0/0. LRS 72 Assist E-Line (PERFORATING). Pumped 172 bbls of crude into the TBG to push tool down. Final T/I/O= 450/0/0. 3/21/2025 ***WELL SI ON ARRIVAL*** (PERF) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH PERF INTERVAL 13458'-13460' W/ 1.56" GEO GUN 2' 6SPF 60 DEG PHASE CCL TO TOP SHOT 7.4' CCL STOP DEPTH 13450.6' TOL 27' LOG CORRELATED TO PDS COIL FLAG DATED 09-18-2014 JOB COMPLETE ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU 18-11B 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 18-11B Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 213-195 50-029-21181-02-00 ADL 0028321 , 0028302 , 0028307 19493 Conductor Surface Intermediate Liner Liner 8625 80 2462 2630 10922 6477 16257 20" 13-3/8" 9-5/8" 7" 4-1/2 8684 48 - 128 46 - 2508 44 - 2674 2525 - 13447 13015 - 19492 2470 48 - 128 46 - 2508 44 - 2674 2525 - 8202 7848 - 8625 none 470 2670 4760 5410 8540 16257 , 18717 1490 5380 6870 7240 9020 14906 - 19378 4-1/2" 12.6# 13Cr85 42 - 130178677 - 8641 4-1/2" HES TNT Perm No SSSV 12895 7755 Date: Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY 10/01/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 12:24 pm, Sep 12, 2023 323-519 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.09.12 12:08:27 -08'00' DSR-9/12/23MDG 9/13/2023MGR22SEP23 10-404 CO 341J *&:JLC 9/22/2023 09/22/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.09.22 13:00:34 -08'00' RBDMS JSB 092223 P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 Well Name:18-11B Plug and perf API Number:50-029-21181-02 Current Status:Offline Uncompetitive Rig:CTU Estimated Start Date:10/01/2023 Estimated Duration:2.5 days Regulatory Contact:Carrie Janowski Permit to Drill Number:213-1950 First Call Engineer:David Bjork (907) 440-0331 (c) Second Call Engineer: AFE Number:Cost / IOR Current Bottom Hole Pressure:3,350 psi @ 8,800’ TVD 7.4 PPGE Max. Anticipated Surface Pressure:2,470psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2250psi (Taken on 09/20/2022 Coil) Min ID:1.87” ID – nipple reducer @ 13,001’MD Max Angle:98 Deg @ 19,174’ Reference Log: PDC 24-July 2014 Brief Well Summary: July 2014 Rotary sidetrack completed with 1150' of Z1A perfs. The heel was intentionally left unperfed to allow for a future CTD kickout point. Elected to shoot this in January 2018 as well as shut-off the toe up perfs which were shot to bring in-situ lift to the well - results were positive (cut gas and increased oil), however, short lived as oil rate declined rather quickly . Nov 2019 added ~1,000' of 1A in the heal, with an orifice over the original perfs for insistu, initial POP -3,600 bopd. The lower perfs were isolated when the well gassed out. Objective: The objective of this procedure is to add two intervals of Z1AB perfs (14,564’- 14,704’ (140ft) and 14,330’ – 14,438’ (108ft) and isolate the current Z1 perfs. Procedure: Slickline 1.Pull 45KB POGLM patch from 2,979ft. Pull nipple reducer from 13,001ft. Coiled Tubing Notes: x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x Note: The well will be killed and monitored before making up the initial perfs guns. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 2. MIRU Coiled Tubing Unit and spot ancillary equipment. 3. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. o add two intervals of Z1AB perfs (14,564’- 14,704’ (140ft) and 14,330’ – 14,438’ (108ft) and isolate the current Z1 perfs. P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 4. Bullhead 280 bbls of KWF, 8.4 ppg 1% KCl or 8.5 ppg down the tubing to the formation. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 226 bbls b. 4-1/2” Tubing and Liner – 14,906’ X .0152bpf = 226 bbls 5. MU and RIH with drift BHA to resemble 4-1/2” CIBP. Run past 14,825ft ctmd and POOH. MU and RIH with logging tools and log OOH. 6. POOH and confirm good data. 7. RIH with 4-1/2” cast iron bridge plug and set at ~14,825ft. Pressure test to 500-psi 8. Freeze protect tubing as needed. 9. At surface, prepare for deployment of TCP guns. 10. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 11.Pickup safety joint and TIW valve and space out before MU guns.Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 12. Break lubricator connection at QTS and begin makeup of TCP gunsand blanksperschedule below. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 18-11B Addperf Schedule *HES 2-7/8” Maxforce guns were used to estimate for this job. 3.047” gun swell 13. MU lubricator and RIH withperf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. POOH. c. Note any tubing pressure change in WSR. 14. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 15. Pump pipe displacement while POOH. Stop at surface to reconfirm well dead and hole full. 16. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. Standing orders flow chart included with this sundry request. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 17. RBIH to 8,000ft and swap the wellbore to diesel ~ 120bbls. 18. RDMO CTU. Perf Interval Perf Length Gun Length Weight of Gun (lbs) Run #1 14,564’ – 14,704’ 140’140’1,736lbs (12.4ppf) Run #2 14,330’ – 14,438’ 108’108’1,339lbs (12.4ppf) P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 S-line 19. Set nipple reducer at 13,001ft. E-line 20. Set redressed 45KB POGLM patch at 2,979ft. Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Mini Log 7. Tie In Log/Perf Sheet 8. Sundry Change Form P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 Current Wellbore Schematic P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 Proposed Schematic Coiled Tubing BOPs P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 Standing Orders for Open Hole Well Control during Perf Gun Deployment P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 Equipment Layout Diagram 18-11B Mini Log P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 18-11B Tie-In Log P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 P Plug and Ext Adperf Procedure 18-11B PTD: 213-195 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________PRUDHOE BAY UNIT 18-11B JBR 11/04/2022 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:0 5 accumulator bottles at 1400 psi AVG pre charge. Test Results TEST DATA Rig Rep:Jeff HillOperator:Hilcorp North Slope, LLC Operator Rep:Mark Spiller Rig Owner/Rig No.:Little Red Services 2 PTD#:2131950 DATE:9/19/2022 Type Operation:WRKOV Annular: Type Test:INIT Valves: 250/4000 Rams: 250/4000 Test Pressures:Inspection No:bopKPS220920185648 Inspector Kam StJohn Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 2.2 MASP: 2350 Sundry No: Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.NA Test Fluid W Misc NA Upper Kelly 0 NA Lower Kelly 0 NA Ball Type 0 NA Inside BOP 0 NA FSV Misc 0 NA 7 PNo. Valves 2 PManual Chokes 0 NAHydraulic Chokes 0 NACH Misc Stripper 1 1.50"P Annular Preventer 0 NA #1 Rams 1 Blind/Shears P #2 Rams 1 1.5" Pipe/slips P #3 Rams 0 NA #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 2" Plug P HCR Valves 0 NA Kill Line Valves 0 NA Check Valve 1 2"P BOP Misc 2 EQ Ports P System Pressure P2885 Pressure After Closure P2205 200 PSI Attained P12 Full Pressure Attained P50 Blind Switch Covers:Pall stations Bottle precharge P Nitgn Btls# &psi (avg)NA0 ACC Misc NA0 NA NATrip Tank NA NAPit Level Indicators NA NAFlow Indicator NA NAMeth Gas Detector NA NAH2S Gas Detector NA NAMS Misc Inside Reel Valves 1 P Annular Preventer NA0 #1 Rams P7 #2 Rams P6 #3 Rams NA0 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke NA0 HCR Kill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y Anne Prysunka at 9:03 am, Oct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tL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed AN U020 Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ operations 0 h wp,�c C Suspend ❑ Perforate Other Stimulate ❑ Alter Casing ❑ Change p[[R�rp.-99 Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: WWP Perforating 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 213-195 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6API Number: 50-029-2111181-02-00 7 Property Designation (Lease Number): ADL 028321, 028302 & 028307 S. Well Name and Number: PBU 18 -IIB 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11, Present Well Condition Summary: Total Depth: measured 19493 feet Plugs measured 18717 feet true vertical 8625 feet Junk measured None feet Effective Depth: measured 18717 feet Packer measured 12896 feet true vertical 8700 feet Packer true vertical 7754 feet Casing: Length: Size: MD: ND: Buret: Collapse: Structural Conductor 80 20" 48-128 48-128 1490 470 Surface 2462 13-3/8" 46-2508 46-2508 5380 2670 Intermediate 2630 9-5/8" 44-2674 44-2674 6870 4760 Liner 10922 7" 2525-13447 2525-8202 7240 5410 Liner 6477 4-1/2" 13015 - 19492 7848-8625 9020 8540 Perforation Depth: Measured depth: 14806 - 19378 feet True vertical depth: 8677-8641 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr85 42-13017 42-7850 Packers and SSSV (type, measured and 4-1/2" HES TNT Perm Packer 12896 7754 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 274 25727 6 0 1886 Subsequent to operation: 3221 29436 55 0 509 14. Attachments: (required Per 20Anc25.070.25.071,&25,283) 15. Well Class after work: Daily Report of Well Operations m Exploratory ❑ Development 51 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 9 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319455 Authorized Name: Gallaway, Jerimiah Contact Name: Galloway, Jerimiah Authorized Title: I & I Engineerqq Contact Email: Jerimiah.Gallowayabp.com Date: 0,4 SAN 1010 Contact Phone: +1 9075645711 Authorized Signature: ,�,r,,;,.e.�'Y•jj�n Form 10-404 Revised 04/2017`/��O`� K&RJ'4�Nb,�1 -ABDMSL*'JAN 102020 Submit Original Only Daily Report of Well Operations PBU 18-11 B ACTI\RTVnATF �� �......,., ***WELL S/I ON ARRIVAL***(profile mod) DRIFT W/2'1-7/8" STEM, 3.80" CENT, 1-1/2" S -BAILER TO PATCH @ 2945' SLM/2981' MD. RIH W/ 4-1/2" GS TO PULL POGLM, RELEASE POGLM AT 2945' SLM AND BEGIN POOH 10/22/2019 ****CONT WSR ON 10-23-19**** **CONT WSR FROM 10-22-19****(profile mod) PULLED 45 KB UPPER STRADDLE POGLM FROM 2981' MD. PULLED 45 KB LOWER PACKER FROM 2978' SLM, DROPPED AND RECOVERED FROM 8974' SLM. DRIFT TO 4-1/2" x 2-3/8" NIPPLE REDUCER W/ 3.80" CENT/S-BAILER AT 12960' SLM. SET 4-1/2" SLIP STOP CATCHER SUB AT 3235' SLM. LRS LOADED IA W/ 190 BBLS CRUDE. SET BK-DGLV W/ EXT PACKING IN STA #6 (2996' MD) PULL 4-1/2" EMPTY SLIP STOP CATCHER SUB FROM 3235' SLM LRS LOADED TUBING W/ 300 BBLS CRUDE. 10/23/2019 ****CONT WSR ON 10-24-19'**'. ****CONT WSR FROM 10-23-19****(profile mod) PULL 4-1/2" x 2-3/8" NIPPLE REDUCER FROM 13,001' MD. DRIFTED TO DEVIATION AT 14,183' SLM W/ KJ, 2'1-7/8'p STEM, 3.70" CENT, 3" S -BAILER 10/24/2019 ***WELL TURNED OVER TO DSO*** CTU 9 w/ 1.75" CT. Scope; SBHPS, RCT, Set Polar Choke, Set Tailpipe Assembly. MIRU. Perform seven day BOP test 11/3/2019 ...In progress... CTU 9 w/ 1.75" CT. ***Continue from 11/03/19*** Scope; SBHPS, RCT, Set Polar Choke, Set Tailpipe Assembly. Drift w/ 3.69" venturi, sat down at 18492, work through to final tag depth 18515. roughly 200' above target. APE called good. pooh. Venturi recovered pert -gun debris / sand. RIH w/ memory log tools. Log main pass from 18,450' up to 13,400'. PAINT RED WHITE & BLUE FLAG @ 16,600'. Perform static stops and repeat pass per program. POOH. ...In progress... 11/4/2019 CTU 9 w/ 1.75" CT. ***Continue from 11/04/19*** Scope; SBHPS, RCT, Set Polar Choke, Set Tailpipe Assembly. Confirm depth correction +41.5' . Set 3.59" Polar Choke (.187" orfice) at 17200' ME. RIH w/ Tailpipe assembly. Set top of packer @ 16244.9', 1.875" X nipple installed in tail pipe @ 16257'. DAL left in hole 18.69'. POOH 11/5/2019 ...In ro ress... CTU 9 w/ 1.75" CT. ***Continue from 11/05/19*** Scope; SBHPS, RCT, Set Polar Choke, Set Tailpipe Assembly. Finish POOH w/ setting assembly from tail pipe. RDMO 11/6/2019 ...Complete... T/1/0=0/0/0. RU Grey lubricator #68-681 w/2' ext. PT 350/3500 (pass). Set 4" CIW "H" TWC #294 through tree @102". Pulled upper tree & installed new klondike 1 tree. Torq to API specs. Pt 350/ 5000 (passed). Installed 2" VR plug in companion IA. removed 2" ciw companion IA vlv & installed tapped blind flange. Torq to API specs. Pt 350/5000psi (passed). Final T/1/0= TWC/0/0. ***Job 11/6/2019 complete*** See log for details. T/I/O=TWC/0/0 Rig Down "Klondike Tree", Rig up Dryhole tree ASV #40, Torqued to API Specs. PT 300 psi (PASS) PT 5000 psi (PASS) See "Field Charted Tests" MV=O ASV=C IA, OA OTG. 23:30 11/11/2019 ***Job Complete***. FWP's TWC/0/0 See log for details. CTU #9 - 1.75" coil MIRU on WWP. Start weekly BOP test. 11/18/2019 ** In Progress ** Daily Report of Well Operations PBU 18-IIB CTU #9 - 1.75" coil **Continued from 11/18/19 WSR** Weekly BOP test. Redress B/S Ram. 11/19/2019 **In Progress' T/1/0=0/0/0 PULL TWC. R/U Gray lubricator with 2-5' ext,1-3' ext, & H-plug pulling tool. PT'd lubricator Low 300psi, High 3500psi. Pulled 4" H TWC #294 @ 96". R/D Gray Lubricator & Ext. 11/20/2019 RDMO ***Job Com lete*** FWHP=0/0/0 CTU #9 - 1.75" coil on WWP Weekly BOP Test Complete. Pull TWC, Load floor with guns. Make up logging BHA and RIH. Change out and test reel isolation valve. 11/20/2019 **In Progress' CTU#9 - 1.75" Coil on WWP. RIH with memory logging BHA. Pump 1% slick KCI with safelube down backside while RIH. Stop at 13,663', 13,804', 13,961', 14,299' for SBHP survey. Circulate well over to 1 % KCI and begin logging up from compression while keeping the well loaded with 1 % KCI. Log from 16244 to 12900 painting a red tie in flag at 14700'. POOH and begin circulating across the top at —15 bbl/hr losses. Receive good data ( +10' correction). Correlate to PDCL Log 24-July-2014. PT MHA and set down injector. Deploying Perf Gun BHA while pumping across the top. Space out Deployment Bar & Hang BHA on #2 Pipe/Slip Ram. Pick up Injector & make up to perf bha. RIH w/ Sib TCP 2-7/8" x 1286' of Perf Guns w/ Blanks. Rih while pumping down backside to keep well liquid packed. 11/21/2019 **In Progress' CTU#9 1.75" CT Wellwork Platform. Job Scope: Adperf Continue Rih w/ Perf Gun BHA. Correct depth at flag to btm shot. Position perf bha at btm shot depth. Launch 1/2" ball & Perforate Intervals: 14906' - 15113', 15265' - 15665', 15765' - 16165'. Good indication of firing at 3100psi. Well went on Vac. Bullhead KCL down backside while pooh. Slowly lost injectiity while at surface and swap to pumping across the top while laying down perf gun BHA. FP well with 38 bbls of 60/40 methanol. RDMO CTU. 11/22/2019 ***Job Complete*** T/I/O=TWC/0/0. Post well work platform. RD 4" temp ASV #40. RU 4" Cameron upper tree. Torqued to API spec. PT to low 300psi and high 5000psi for 5 min ea. Passed. Pulled 4" H TWC #438 @135". PT tree cap to 500psi. Passed. RD 2" Companion UA blind. RU 2" Cameron I/A valve. Torqued to API spec. PT to low 300psi and high 3500psi for 5 min ea. Passed. Pulled 2" VR plug. 11/24/2019 Job Complete. See log. Final WHP's Vac/0/0. SV,SSV,WV=C. MV=O. I/A,O/A=OTG. ***WELL S/I ON ARRIVAL***(pre-patch work) RAN 3.80" G-RING & 4 1/2" BL-BRUSH TO XN NIPPLE AT 13,001' MD. BRUSH PACKED W/ COIL SHAVINGS & SMALL SCREW LODGED IN GAUGE RING WINDOW SET 4 1/2" SS-CSUB AT 3099' SLM. PULLED EXTENDED PKG BK-DGLV FROM ST#6 AT 2996' MD. PULLED 4 1/2" SS-CSUB FROM 3099' SLM. 11/26/2019 ***CONT ON 11-27-19 WSR*** ***CONT FROM 11-26-19 WSR***(pre patchwork) LRS LOADED IA WITH 165 BBLS OF CRUDE & TBG WITH 300 BBLS OF CRUDE. BRUSHED DOWN TO XN NIPPLE AT 13,001' MD WITH 3.80" G-RING & 4 1/2" BL-BRUSH. SET 4-1/2" x 2-3/8" NIPPLE REDUCER IN XN-NIPPLE @ 13,001' MD CONFIRMED GOOD SET W/ 4-1/2" CHECK SET.(sheared) SET 2-3/8" XX-PLUG IN NIPPLE REDUCER @ 13,001' MD. LRS PERFORMED PASSING CMIT-TXIA. see Irs to 11/27/2019 ***WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** **WELL SHUT IN ON ARRIVAL*** (ELINE SET LOWER PACKER) INTIAL T/1/0=0/0/0 SET 45 KB LOWER PACKER ME @ 3017', TOP OF PACKER @ 3015', OAL=8.45', MIN ID=2.45", CCL STOP DEPTH=3008.1', CCL TO MIDDLE ELEMENT=8.92' FINAL T/1/0=0/0/0 11/29/2019 JOB COMPLETE, DSO NOTIFIED*** Daily Report of Well Operations PBU 18-11B ***WELL FOUND S/I ON ARRIVAL*** (IOR) DRIFT TO LOWER ANCHOR W/ 2' 1-7/8" STEM, 3.80" CENT, 3.50" LIB @ 2977' SLM (impression of lower anchor). 12/10/2019 ***JOB CONTINUED ON 11 -DEC -2019*** ****CONT WSR FROM 12-1 0-1 9****(ior) SET 4-1/2" KB UPPER STRADDLE/WFD POGLM AND BK-DGLV W/ HES DPU @ 2979' MD LRS MIT -T TO 2500 psi **FAIL** LLR=.84 GPM (see LRS log for details) SET 4-1/2" KB LTTP @ 2943' SLM. MIT -T TO 2500 psi **PASS**(see LRS log for details) PULL BK-DGLV FROM POGLM @ 2962' SLM (DGLV in good condition) SET BK-DGLV IN POGLM @ 2962' SLM. MIT -T TO 2500 psi **FAIL**(see LRS log for details) PULL BK-DGLV FROM POGLM @ 2962' SLM (DGLV in good condition) SET BK-DGLV IN POGLM @ 2962' SLM. MIT -T TO 2500 psi 12/11/2019 ****CONT WSR ON 12-12-13**** ****CONT WSR FROM 12-11-19****(ior) DRIFTED TO 2-3/8" XX -PLUG W/ 2'1-1/2" STEM, 1.75" CENT, 1-1/2" S -BAILER @ 13,001' MD. RUN READ ARCHER LDL FROM 13,001' MD TO SURFACE. (leak in patch @ 3005' AND 3010' MD. PULL 4-1/2" KB UPPER STRADDLE POGLM FROM 2979' MD.(all elements and seals look good). RIH W/ 1.50" CENT AND 2-3/8" X EQ -PRONG TO EQUALIZE XX PLUG at 13,001' MD. 12/12/2019 ****CONT WSR ON 12-13-19**** ****CONT WSR FROM 12-12-19****(ior) PULLED 2 -3/8")(X -PLUG FROM NIPPLE REDUCER @ 13,001' MD. SET 4-1/2" LTTP IN 45 KB LOWER ANCHOR @ 3015' MD. LRS PERFORM CMIT-T x IA TO 2500 psi**PASS**(see LRS log for details) PULL 4-1/2" LTTP FROM 45 KB LOWER ANCHOR FROM 3015' MD. BRUSHED SEAL BORE OF 45 KB LOWER ANCHOR AT 3015' MD W/ 3.25" BLB. SET 4-1/2" LTTP IN 45 KB LOWER ANCHOR WITH FRUDENBURG PKG (3.0" SEALS) AT 3015' MD. LRS PERFORMED PASSING CMIT-TxIA TO 2500 PSI (see LRS log for details). TROUBLESHOOT W/ 4-1/2" D&D HOLEFINDER (see log for details). 12/13/2019 ****CONT WSR ON 12-14-19**** ****CONT WSR FROM 12-13-19****(ior) SET 4-1/2" KB UPPER STRADDLE/WFD POGLM AND BK-DGLV W/ HES DPU @ 2979' MD MIT -IA TO 2500 psi (PASS)**see LRS log for details** 12/14/2019 ****WELL LEFT S/I ON DEPARTURES, DSO NOTIFIED**** LRS Well Test Unit 1. Flowback after adperf for possible solids. Begin WSR on 12/15/19. Inlet Well 12/15/2019 18-11 Outlet Well 18-12. MIRU. Continue WSR on 12/16/19 LRS Well Test Unit 1. Flowback after adperf for possible solids. Continue WSR from 12/15/19. Inlet Well 18-11 Outlet Well 18-12. Continue RU, PT, Work on flow line ice plug. Continue WSR on 12/16/2019 12/17/19 LRS Well Test Unit 1. Flowback after adperf for possible solids. Begin WSR on 12/16/19. Inlet Well 18-11 Outlet Well 18-12. Back Flow 18-11, Shut Down for Weather, POP Well to Tanks. Continue 12/17/2019 WSR on 12/18/19 LRS Well Test Unit 1. Flowback after adperf for possible solids. Begin WSR on 12/17/19. Inlet Well 12/18/2019 18-11 Outlet Well 18-12. Flow to Tanks, Divert to Production. Continue WSR on 12/19/19 LRS Well Test Unit 1. Flowback after adperf for possible solids. Continue WSR From 12/18/19. Inlet 12/19/2019 Well 18-11 Outlet Well 18-12. Flow Well. Continue WSR on 12/20/19 LRS Well Test Unit 1. Flowback after adperf for possible solids. Continue WSR From 12/19/19. Inlet Well 18-11 Outlet Well 18-12. Flow Well, 12hr Test, Start 12 Hour Piggy Back Test, Continue WSR 12/20/2019 on 12/21/19 LRS Well Test Unit 1. Flowback after adperf for possible solids. Continue WSR From 12/20/19. Inlet Well 18-11 Outlet Well 18-12., Continue 12 Hour Piggy Back Test, RDMO End WSR on 12/21/19, 12/21/2019 Job Complete TREE= CIWH4-1N8" VVELLHEAD= WEVOY ACTUATOR= BAKER OKB. ELEV = 56' BF. ELEV = 7 KOP= 2674 Max Angle = 98° Q 19174' Datum MD= WA Datum ND= 8800'SS 20" 13-3/8" CSG, 72#, L-80 BTC, D = 12.347" J— 2600' 9-5/8" W-IPSTOCK (05/13/14) 2674' 9-518' CSG, 47#, L -BO NSCC, D = 8.881'2674' / Minimum ID = 1.87" @ 13001' 4-1/2" X 2-3/8" X NIPPLE REDUCER TOP OF CEMENT (06109114—)7-412666' 1 PERFORATION SUMMARY REF LOG: PDCL ON 0724/14 ANGLE AT TOP PERF: 90° @ 14906' Note: Refer to Producton DB for Nstorical perfdata SIZE SPF INTERVAL OprNfSqz SHOT SOz 4-12' 5 13135 -13140 S 06/06114 06/07/14 2-78" 6 14906 -15113 O 1122119 5089 2-78" 6 15265 -15665 O 1122119 2-78" 6 15765-16165 O 1122119 0 2JM" 6 16346 -17050 O 01/03/18 DMY 2-78" 6 17280 -17630 O 0784114 6357 2-7B" 6 17850 -18180 O 0784/14 MYHASD PACKNG 2-7B" 6 18230 -18550 O 0784/14 2-78" 6 18850 -19000 C 07/04/14 2-78" 6 19330 -19360 C 0922/14 2-78' 6 19358 -19378 C 09/18/14 4-12" TBG, 12.6#, 13CR-85 VAM TOP HC, 13017- -0152 bpf, D = 3.958" I X NP @ 16257' (1185/19) 7- LNR, 26#, L-80 VAM TOP HC, 13446' POLAR CHOKE. 3/16' ORIFICE TOP OF CHOKE .0377 bpf, D = 6276" 12/11/19 JGL/JMD GLV C/o (I i26/19) 1-12' LNR 12-6#, 13CR-85 VAM TOP, I— 19491' D .0152 bpf, = 3.958" 18-11 14-1/2" HES X NP, D = 3.813" 2524' J19 -5/8"X 7'BKRHRD-EZXRJ LTPw/TEBACK SLEEVE, ID= 6.19" 2640' 9-5/8" X 7' FLIXLOCK LNR HGR ID = 6.22" MLLOUT WINDOW (18-11B) 2674' - 2691' I' - 3015' 45 KB PKR, D =1.901' (12/14/19/19) 197' WFD 1' GLM POCKET./ BK PROFILE (12/14/19) TALPPE ASSYw/ WFD WDEPACK PKR & 1.875° 16245' - 12 KBG2 X NP @ 16257' (1185/19) DMYIN POGLM POLAR CHOKE. 3/16' ORIFICE TOP OF CHOKE 17199' - 12/11/19 JGL/JMD GLV C/o (I i26/19) 1.34' DAL (11/05/19) 62 KBG2 1-12' LNR 12-6#, 13CR-85 VAM TOP, I— 19491' D .0152 bpf, = 3.958" 18-11 14-1/2" HES X NP, D = 3.813" 2524' J19 -5/8"X 7'BKRHRD-EZXRJ LTPw/TEBACK SLEEVE, ID= 6.19" 2640' 9-5/8" X 7' FLIXLOCK LNR HGR ID = 6.22" MLLOUT WINDOW (18-11B) 2674' - 2691' I' - 3015' 45 KB PKR, D =1.901' (12/14/19/19) 197' WFD 1' GLM POCKET./ BK PROFILE (12/14/19) 12896' 7' X a-12' TM PKR D = 3.556" 12929' 4-12" HES X NP, D = 3.813" 13001' 4-112' HES XN NP. D= 3.725' 13001' 4-12' X 2-38" X NP RED, D= 1.875' (11, 13014' 7'X5"BKRHRD-EZXPLTPw/TEBACK SLEEVE, D=4.34' 13017' 4-1/2" WLEG, D = 3.883" ELMD TT NOT LOGGED ( 13048' x--15" X 4-12" XO BUSHING, D = 3.86' 13038' 7' X 5" BKR FLD(LOCK LNR HGR D = 4.31' 13606' 6.125. OPBV HOLE SDEIRACK 14466' TD PLOT HOLE 15002'&16713' 4-1/2"PUPJOWI'Sw/RATAGN STOPFROM PIN OF PUP JT J 45KB PKR w /2-38' X NP @ 19206', D = 1 (01/25/16) - 19239'45 KB PKR w / 12" ORFICE, D = .05" (09/23/14) DATE REV BY COMMENTS DATE REV BY COMMENTS 2994 12 KBG2 POGLM DMYIN POGLM 12/14/19 1029/19 CJNUMD PULLED PATCHAND NPPLE 12/11/19 JGL/JMD GLV C/o (I i26/19) 4239 62 KBG2 DMY BK 0 07/06/14 5089 59 KBG2 'DMY BK 0 1223/17 5753 60 KBG2 DMY BK 0 07/06/14 L 6204 65 KBG2 DMY BK 0 07/06/14 6357 70 KBG2 DMY BK D 0786/14 MYHASD PACKNG OGLM TRADDLING ORIGINAL STA 2996' Si4-12" 866' HES X NP, D = 3.813" 12896' 7' X a-12' TM PKR D = 3.556" 12929' 4-12" HES X NP, D = 3.813" 13001' 4-112' HES XN NP. D= 3.725' 13001' 4-12' X 2-38" X NP RED, D= 1.875' (11, 13014' 7'X5"BKRHRD-EZXPLTPw/TEBACK SLEEVE, D=4.34' 13017' 4-1/2" WLEG, D = 3.883" ELMD TT NOT LOGGED ( 13048' x--15" X 4-12" XO BUSHING, D = 3.86' 13038' 7' X 5" BKR FLD(LOCK LNR HGR D = 4.31' 13606' 6.125. OPBV HOLE SDEIRACK 14466' TD PLOT HOLE 15002'&16713' 4-1/2"PUPJOWI'Sw/RATAGN STOPFROM PIN OF PUP JT J 45KB PKR w /2-38' X NP @ 19206', D = 1 (01/25/16) - 19239'45 KB PKR w / 12" ORFICE, D = .05" (09/23/14) DATE REV BY COMMENTS DATE REV BY COMMENTS 09M7/84 RWN 41 INITLAL COMPLETION 1126/19 TFA/JMD ADPERFS (1122/19) 11817/09 NORDtCI CTD SIDETRACK (18-11A) 1285/19 RCB/ -WD SET NP REDUCER & PLUG (1127/19) 07818/14 P-272 SIDETRACK 18-11B) 1285119 TJS/JMD SET45 KB LOWER PKR (1129/19) 1029/19 CJNUMD PULLED PATCHAND NPPLE 12/11/19 JGL/JMD GLV C/o (I i26/19) 1029/19 CJWJMD GLV G/O 1023/19 1226/19 CJN/JMD SET UPPER PKR w/ POGLM 12/14/19 11/12/19 JTM/JMD SET POLAR CHOKE & TAIL P 1226/19 CJN/JMD PULL ED XXPLUG(12/13/19) PRUDHOE BAYUNIT WELL: 18-11B PERMIT No: 2131950 API No: 50-029-21181-02 BP Exploration (Alaska) WELL LOG TRANSMITTAL #905740912 To: Alaska Oil and Gas Conservation Comm. Attn.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Radial Cement Bond Log: 18-11B Run Date: 11/4/2019 213195 3 160 8 December 4, 2019 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 18-11B Data in LAS format, Digital Log Image files 50-029-21181-02 RECEIVED DEC 0 9 2019 A®GCC 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com and GANCPDC@USAANC.hoL Date:// M1,9 Signed: THE STATE °fALASKA. GOVERNOR MIKE DUNLEAVY Jerimiah Galloway Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 18-11B Permit to Drill Number: 213-195 Sundry Number: 319-445 Dear Mr. Galloway: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www. a ogcc. a lasko. gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, V-/� Daniel.T. Seamount, Jr. Commissioner n d DATED this Z day of October, 2019. RNMSi CC) 0 3 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend Perforate IZ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program Plug for Rednll ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing D Other WM Perforationg ' 2. Operator Name: BP Exploration (Alaska), Inc 4, Current Well Class: Exploratory ❑ Development ®. 5. Permit to Drill Number: 213-195 ' 3, Address: P.O. Box 196612 Anchorage, AK 99519E812 Stratigrephic ❑ Service ❑ 6. API Number: 50-02941181-02-00 7. If perforating: C.O. 341E e. Well Name and NumbRECEIVE What Regulation or Conservation Order governs well spacing in this pool? E C E I V Will planned Perforations require a spacing exception? Yes ❑ No RI PBU 18-11B ' G Y 9. Property Designation (Lease Number): 10. Field/Pools: OCT0 1 r1o1f1 4. L IJ ADL 028321. 028302'& 028307 PRUDHOE BAY. PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft): Effective Depth MD: Effegive Depth TVD: MPSP (psi): Plugs (MD): JLAAWUUU 19493 8625 18717 8700 2420 18717 None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 48-128 48 - 12B 1490 470 Surface 2461 13-3/8" 46-2508 46-2508 5380 2670 Intermediate 2630 9-5/8" 44-2674 44-2674 6870 4760 Liner 10922 7" 2525-13447 2525-8202 7240 1 5410 Liner 6477 4-1/2" 13015 - 19492 7848 - W25 9020 1 8540 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 16346- 19378 6683 - 6841 4-1/2" 12.6# 13Cr85 42-13017 Packers and SSSV Type: 4-1/2" HES TNT Perm Packer Packers and SSSV MD (ft) and TVD (ff): 12896, 7754 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary m Wellbore Schematic m 13. Well Class after proposed work. • Detailed Operations Program ❑ BOP Sketch m Exploratory ❑ Stratigraphic ❑ Development M Service ❑ 14. Estimated Date for Commencing Operations: 10/9/2019 15. Well Status after proposed work: Oil 0 ' WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval. Dale: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is We and the procedure approved herein will not Contact Name: Galloway, Jenmiah be deviated from without prior written approval. Contact Email: Jerimiah.Galloway@bp.com Authorized Name: Galloway, Jerimiah Contact Phone. +1 907 564 5711 Authorized Title: 181 Engineer �J Authorized Signature: .brs�—.K Date: Z pCT 1g COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 31 n - q q 5 {� Plug Integrity ❑ BOP Test 1-1MechanicalIntegrity Test ❑ Location Clearance ❑ Other: Post Initial Injection MIT Req'd? Yes ❑ No ❑/. Spacing Exception Required? Yes L1No Cd Subsequent Form Required: /10— Vol/ APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date:/ RBDMS-'L/ OCT 0 3 19 ORIGINAL 'rNu� Yn /L 6Zoa77a Submit Form and Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval, Attachments in Duplicate A by 0 18-11 B Extended Add Perf Wellwork Procedure Reauest Sundry Number: Awaiting Approval 1 Scope of Work 18-11 B is a horizontal rotary sidetrack drilled in 2014. It is primarily a Z1 producer with a toe up into zone 2A for in-situ gas lift. The well was initially perforated in the toe in Z1 and Z2A with an orifice set over 2A to allow a controlled amount of gas production in the toe for insitu lift. The well connected to gas and the following year the 2A perfs were blanked off, which resulted in shutting off competitive production (30,000 GOR) The plug was pulled 4 months afterwards and the well was a fulltime producer for the next 2 years. January 2018 a plug was set over the toe parts and 700' of 1A perfs were shot. Recently the well has started seeing sporadic on time due to approaching field marginals. The production liner still contains significant unperfed Z1A footage. The primary objective of this intervention is to isolate the perforations that have been open to flow since the well was drilled (believed to be contributing the HGOR fluid) with a packer/orifice assembly to provide insitue lift and perforate 1,200' of Z1A resulting in the well having a total of 1,900' of Z1A open to flow. The Z1A that will be open to flow does not appear to be as clean of quality of sands as the original perforations hence the increased footage. A packer/tailpipe assembly will set between the current perfs and the adperfs to provide the optionality of shutting off of the 700' of Z1A perfs shot in 2018 without needing to remove the patch in the tubing. A minimum of 1 00'spacing has been left inbetween the perforation intervals to allow for the future potential of retrofiting the liner with AICD's. A cement log will be run prior to evaluate the cement quality, there were losses observed and potential fault @ 14,497' during drilling. Job Sequence WBL Steps E. Townsend/C. Olsen: Coil, Pumping and Well Testing Supt. Date: 9/30/2019 To: L. Seymour/ T. Norene: Special Projects Supt. 2 SL R. Mielke/J. Culpepper: Wireline Supt. AFE: 3 From: Jerimiah Galloway IOR: 265 VS Service Tree Valves, Set TWC Subject: 18-11 B Extended Add Perf Revision: Sundry Number: Awaiting Approval 1 Scope of Work 18-11 B is a horizontal rotary sidetrack drilled in 2014. It is primarily a Z1 producer with a toe up into zone 2A for in-situ gas lift. The well was initially perforated in the toe in Z1 and Z2A with an orifice set over 2A to allow a controlled amount of gas production in the toe for insitu lift. The well connected to gas and the following year the 2A perfs were blanked off, which resulted in shutting off competitive production (30,000 GOR) The plug was pulled 4 months afterwards and the well was a fulltime producer for the next 2 years. January 2018 a plug was set over the toe parts and 700' of 1A perfs were shot. Recently the well has started seeing sporadic on time due to approaching field marginals. The production liner still contains significant unperfed Z1A footage. The primary objective of this intervention is to isolate the perforations that have been open to flow since the well was drilled (believed to be contributing the HGOR fluid) with a packer/orifice assembly to provide insitue lift and perforate 1,200' of Z1A resulting in the well having a total of 1,900' of Z1A open to flow. The Z1A that will be open to flow does not appear to be as clean of quality of sands as the original perforations hence the increased footage. A packer/tailpipe assembly will set between the current perfs and the adperfs to provide the optionality of shutting off of the 700' of Z1A perfs shot in 2018 without needing to remove the patch in the tubing. A minimum of 1 00'spacing has been left inbetween the perforation intervals to allow for the future potential of retrofiting the liner with AICD's. A cement log will be run prior to evaluate the cement quality, there were losses observed and potential fault @ 14,497' during drilling. Job Sequence WBL Steps Completed (mm/dd/yy) 1. CT Drift, RCT per logging sheet 2 SL Pull Patch, Nipple Reducer, Set DGLV 3 FB Load TBG & IA 4 VS Service Tree Valves, Set TWC 5 WWP Drift, Log, Set Polar Choke, Set Tailpipe Assembly, Add Perfs (1,006') 6 VS Pull TWC 2.875" PowerJet 207' 7 SL Set Nipple Reducer, Set Plug, Pull DGLV, CMIT-TxIA 15,265'-15,665' 8 FB Assist w/ Load and Test Total:11,193lbs 9 EL Set Straddle Patch Lower Anchor 10 SL Set Straddle Patch, MIT -T, Pull Plug 11 FB Assist w/ Load and Test 12 WT POP w/ Test Separator Pressure Prediction 1. Reservoir pressure - BHP is expected to be -3300 psi (7.2 ppg) @ 8800' TVD. SBHPS has not been run since the B sidetrack was drilled in 2014. Maximum calculated surface pressure with gas (0.10 psi/ft) to surface is 2420 psi. A full column of 1% KCI (8.34 ppg) will provide a -467 psi static overbalance. 2. Fracture pressure - For the PBU main area the FG is estimated to be 0.65 psi/ft. This equates to 5,655 psi at 8,700' TVD, or 12.5ppg EMW. Job Objective: Specific Well Objective 1 Set Polar Choke for insitu gas lift and Tailpipe assembly for zone isolation if needed 2 Perforate 1,006' of sand to increase well productivity 3 Reset GLM straddle and nipple reducer achieving passing MIT -T and CMIT-TxIA Requested Perforations Intervals% Gun Length Interval Approx. Weight 2.875" PowerJet 207' 14,906'-15,113' 11.09 Ib/ft gun = 11,168 lbs Omega 400' 15,265'-15,665' Firing head 25 lbs 400' 15,765'-16,165' Total:11,193lbs Proaram Contacts: Contact Work Phone Mobile Phone Interventions Engineer Jerimiah Gallows 564-5711 828-553-2537 Pad Engineer Finn Oest acrd 564-5026 907-982-9861 Schlumberger Stephen Higgins 907-659-6121 Well 18-11B Revision:0 Current Wellbore Configuration TRff= CM/H4-1/16' n-� Www 18-11 B BAK c ME56 7 2674 98' @ 19174' 20' CON TOR ? WA L I 880055 1118' CSG, )2M, L-80 BTC, 0 260 = 12 34r 0' ID= I Sor (OVIVIB) BBKRLOV43t STRADOLEPI ISNAP { C �ACLE 8 MULE SHOE 245'(01731/18) Minimum ID = 1.875- @ 13001' 7- LW 28M, L-80 VAM TOP HC, .0377 OPf. 0 = 8.276' IE3d OT7ATDN SIMA. W RUFLOG AN EATTCP Pea=: 91' a 16346' NOIe: Refer ro ROUOceon CR im lielericg pert Eats SIZE SW MBNAL I Opn SO SHOT SO2 412' 5 13135 - 13140 S 040414 08107/14 2JM' 6 16346-17080 O 01703718 4239 62 2-718 6 17280- 17630 0 07/04/14 '4 2-78' 6 17850-181W O 07704/14 D 2-718' 6 18230-1&550 O 07N4114 = OLB' 2-718' 6 18850- 19000 C 07/04/14 6204 65 2-778 6 19330- 19360 C 0922714 1 2-778 6 19358- 19378 C 09718114 0 BAFEP/NOTEB: WELL ANr1E>]0"9030'. I MAX OL8: 14.6' 14064'. 7'B V EZXMLTP M83ACK 0=8.19' I MLLOU7 NT001N118-118) 2674' - 2691 1 ",I 6T ..I ST k0 TVD CEV NFE VLV l Ta T DOTE •6 2996 2994 12 KBG-2 OMI M 0 0310418 5 4616 4239 62 K 2 OMI BK 0 07/0414 '4 6363 M89 59 K 2 BK D 12/23/17 3 7673 5753 60 K5G-2 = OLB' BK0 O7Po414 2 W13 6204 65 KSG-2 pM BK 0 07/0414 1 W13 6357 70 K 2 OM( BK 0 O7N414 STA 04 =[M RAS D(TENDED MCKTO STA M6 = TOGI. M 12886' 4-12• FOS X NE, D= 13001' B 0=434' I' FROM MT R1PJf X W@ 19206. D = 1.875' DOTE REV SY CAM.84fS D4TE PEV BY CCM,8418 RBDIDEBAY uw WELL: 1&118 f6Aaf W: 2131950 AR W: 5&02&21181-02 SE019,T11KR15E1278'FW8431'FIAL 09717M FWN411MTIALCOMPLEMM 02701118KFMJ SETLO STRAODLER(R(01131118) 11NT/09 Ci CTDSIOETRACKJMIA) 0226I186/1WJ SETIMFHi ST1DLR(R6i0GL Ftul 07/0&14 P -2M SHtIRACKIt&116) 03108118 BSE/J GLV OO (03/0418) 0122/18 KU F SS T BY KCOR2(01!0418) 01729718 MJCEPSEf BY KCOT2(01702718) 6P Exploration(AWka) 0129118 ZVIAO SEf WF1EDBXXR.IIG(0112N18) Well: 18-11 B Revision: 0 3 1.1 Planned Wellbore Configuration Tw= CM'Havtc K BAKEtC 18-11 B NAO`SOTES: Q E4064'.1E>70°Q80IB'. 50 YM7498' ®19174' 20• WA 252V 368' X7•BKRHRLLEZ ML860055 SM,71 6.19' 1118•GSG. 72a, 1.80810. D=12.Ur { 2600' 9 -SA' WlP3FOOK (05713/14) 2674' 9-5/8' GSC 47p, L-80 NSCO. D = 8.681• ��-2674' 45K8 LPPBi STRAOIXE POGLM. - 2981' D- 19or mvtv181 MULE SHOE, Minimum ID =1.875" @ 13001' 4-112" X 2-318" NIPPLE REDUCER '70T 268, L-80 V"AM V43TIXN1fDN` RY PH LOG' ANGLEAT TCPPL3F: 91' @ 16340 N h Refer b R uc n OB fm 6e<IoncN pert Bela SEE SPF FBEFNAL I C ntS� SEDT L12' 5 13135- 13140 S 08108114 090114 2-314' 6 16346-17050 O 0IMIS 2-716' 6 17 1 17,200' Polar Cho e 2-70 6 2-718' 8 1 18850- 19000 C /04714 0 2-TIfi'fi °4 2-716' 6 19330- 19380 C 22714 w 2-7C 6 19358- 19378 C 0971&14 fi0 4112- LW 12: 0152 W0 D= 9-518'XTFLIXLOCK LNi HGRO AILOUT NNOOw (18-11B) 2676 - 2691' GAS LFT ANTat s ST W NO DEV TYPE VLV LATCH PoRr DATE -6 29% 2938 12 K 2 OIM BK 0 03/06118 5 4636 4239 62 KBG2 0A4/ BK 0 07M14 °4 6363 5 089 59 KBCG2 •CM7 w 0 12123/17 3 7573 5753 fi0 KBG2 DAM BK 0 07 /4 2 8613 62N 65 KBCG2 CIM BK 0 071IX914 1 %13 6357 70 KBG2 OW BK 0 O7I0811d STA F4 =OMY FAS EXIHU® PACK64G SFA a 6 = POGLM u929' 4-1 —XXNP. D=3813• M 16,250' Tailpipe w/ packer assembly a HGFj l0 a n OT7—E N Well: 18-11 B Revision: 0 4 PR1O10EBAY IM w L- WiIB FHd.6T M: 2131950 ARM: 50.029.21181.02 SEC 19, TI IK R15E 1276' FM- & 431' FVA. DATE REV BY OOLOAR r DATE REV BYj 09117184 MNN41 INTIAL COMPLEnoN 02701/18 KFM' SET LOwe9 STRADDLE PKR(U1I31118) 11/07109 CICTDSIOErMCK(18-ifA) 0212&IBM SETIFPERSTTmL. &POGLI.YFlLLPL 07M14 P-272 WMTRACK(18-116) 0310&18aSE3 ULVCIo(01 18) 01!22/18 WVP8RF5 SHOT BY NLCCe2 (01103118) 0129'18 M-Y.fi.D OBPSETBY 14COfa(01ffiMa) BP ExpWWon(Akskal 0129'18 2VIJAD SET DP R3)8 %X RLIG (01125118) Well: 18-11 B Revision: 0 4 3 HEV = HEV = An* = 90.0191 =ID= .TVD- am 18-118 Proposed SAFETY NOTES: WELL ANGLE> 70• Q 8038•. YAX DL8: 14.6• Q 14064'. TTT-12014' 412 H XNP,D•]Bt]' – — - 20.00FDl1CTCR T e-5fr W,V5TOa jQ5fJ.I14) 2674- R5 KB u;FSTMOOLE RECEFFACL.E 6 MLE SROF, ID =1.876" @ 13001• 0377 bar. D - 8.276• ADPERFS 14,906'-15,113' 15,265'-15,665' Able 15,765'-16,165' arrl data _ SIZE Ser aarmnL tpvape arv7 SOZ 411T 5 13135-13140 5 0SM14 06/07/14 2-3N• 6 16346-17050 O 0103118 DAM03MVIS 2-718• a 17280-17630 O 0710014 4638 2-71C 6 17850. 18180 O 0701714 2-716' 6 IBM -18550 O 07701114 5089 2-718' 6 18850 19000 C 07A014 n8KO 2-718' 6 19330 19360 C 09=14 60 2 7/8' 6 19358 1678 C OVI8114 �ro D • 3.958' ISLffVE, D • 6.19' 15/6•%1•FIFXLOCX LN1 Nl7t D. MLLOUF WAD0Y(/8-116) 2874'-269V GAS LJFT AM� ST AD TVD DEV TYPE VLV (022718 ALFJAD PEWS SHDT BY NCOM (0103118) I O V29'18 ALYJMJ CSP SET SY N4CDR2 (01102/18) DATE 'A 2996 2991 /2 KB(i2 DAM03MVIS 5 4638 4239 62 1030 2 pM07IM14 •4 636 5089 59 KBG2 'DAM122117 n8KO 3 7573 5753 60 F03G2 DAM07AM14 2 8613 6201 65 KBC.2 QM07A6'T4 19013 657 70 KeCr2 OAI/OM&14 STA84=DAM W STA 06 • FOG4M 16,250' Tailpipe w/ packer assembly 17,200' Polar Choke N FRIJI OE BAY IM WELL 1&11B FERNIT 02131950 ARM 50,02121181-02 SEC 19, TI IN RISE, 1278 FN- 8 431' FVd. DATE I BY COM,BAS 617E 18V B/ , CONNENT5 08117184 Fa"41 IMTIALCOMPLERNI 1=1118 KFMJSET LOWER STRADDLE FM (OU31118i 1107108 NDWCI CT17510ETR11CK(i6/fA) JUVW18 MFWJ SEFLFERSIWLFKR&FOGUAPILLPL 0708114 P-272 SIOETWICK(13-118) 1031MIS GLV CA)(03WIIIB (022718 ALFJAD PEWS SHDT BY NCOM (0103118) I O V29'18 ALYJMJ CSP SET SY N4CDR2 (01102/18) BP BrploraUan(AWAa) 0129'18 ZVIAO SETNPFED&)XRUC(OV25JI8) 1.2 18-11B Tree/ BOP diagram Hydraulically Actuated Valve Choke Line U El 0,,,,," Ei Platform Floor Riser to platform floor Annular Blind)Shear Coil PipefSlip VBRs Coil Pipef Slip 7 K 7 Spool "Dry Hole Tree" Upper Valve Lower Valve THA Tubing Head Kill Line Ground Level Well: 18-11 B Revision: 0 5 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Wednesday, March 7, 2018 7:29 AM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS FS1 DS Ops Lead;AK, OPS FS1 Facility OTL;AK, OPS FS1 Field OTL;AK, OPS FS1 OSM;AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Dean,James A; G GPB FS1 Drillsites; Stone, Christopher Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J Subject: OPERABLE: Producer 18-11B (PTD#2131950) passed TIFL post GLV change out external-email: 0 All, Producer 18-11B(PTD#2131950)was placed Under Evaluation on 02/23/18 for having sustained inner annulus casing pressure above NOL. On 03/06/18 Slickline changed out the screened orifice with a dummy gas lift valve. DHD subsequently performed a passing TIFL.The passing TIFL indicates the GLV change out restored the well barrier integrity. The well is now classified as OPERABLE. Please respond with any questions. Andrew Ogg scow Well Integrity Engineer BP Global Wells Organization-Alaska Office:907-659-8110 •m: AK, GWO Well Integrity Engineer Sen . "gay, February 23, 2018 5:42 PM To: 'Regg, -s B (DOA) (jim.regg@alaska.gov)'; AK, OPS EOC Specialists; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, S• FS1 Field OTL; AK, OPS FS1 OSM; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEO • Bean, James A; G GPB FS1 Drillsites; Stone, Christopher Cc: 'chris.wallace@alaska.g• AK, GWO Completions Well Integrity; AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT ntegrity; AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; D. -I, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; • _•nnor, Katherine; Romo, Louis A; Sternicki, Oliver R; Tempel, Joshua; Worthington, Aras J Subject: UNDER EVALUATION: Producer 18-11B(P •2131950) sustained IA pressure above NOL All, Producer 18-11B(PTD#2131950)was reported to have anomalous inner�nt ulus pressure above NOL on 02/22/18.The pressure was reported to be 2,460 psi.On 02/23/18 DHD tried to bleed the IA ssure, but could not bleed it below 1,850 psi.The unsuccessful attempt to bleed the pressure indicates a failure of one more well barriers.The well is now classified as UNDER EVALUATION and is on the 28 day clock for diagnostics and rep Plan Forward: • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Friday, February 23, 2018 5:42 PM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS FS1 DS Ops Lead;AK, OPS FS1 Facility OIL;AK, OPS FS1 Field OTL;AK, OPS FS1 OSM;AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Dean,James A;G GPB FS1 Drillsites; Stone, Christopher Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J Subject: UNDER EVALUATION: Producer 18-11B (PTD#2131950) sustained IA pressure above NOL All, Producer 18-11B(PTD#2131950)was reported to have anomalous inner annulus pressure above NOL on 02/22/18.The pressure was reported to be 2,460 psi.On 02/23/18 DHD tried to bleed the IA pressure, but could not bleed it below 1,850 psi.The unsuccessful attempt to bleed the pressure indicates a failure of one or more well barriers.The well is now classified as UNDER EVALUATION and is on the 28 day clock for diagnostics and repair. Plan Forward: 1. Slickline—Change out screened orifice 2. DHD—TIFL 3. Well Integrity Engineer—Additional diagnostics as needed. Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization-Alaska Office:907-659-8110 1 • pro ,V9 -! 9S Loepp, Victoria T (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, December 05, 2017 11:33 AM To: Loepp, Victoria T (DOA) Cc: Leemhuis,Jacob;Thompson, Ryan Subject: Sundry's for 18-11B (PTD#213-195, Sundry#317-189)and 18-29C (PTD#209-055, Sundry#317-209) Attachments: Nabors CDR2 BOPE Stack- Slimhole (11-21-17).xlsx Follow Up Flag: Follow up Flag Status: Flagged Victoria, There is a contingent plan in place to have these 2 approved sundries done by CDR2 instead of the Well Work Platform. Please see attached for the BOPE sketch for CDR2.The scope remains the same for both sundries. 18-11B(PTD#213-195)Sundry#317-189—Plug Perforations and Perforate. 18-29C(PTD#209-055)Sundry#317-209—Perforate. Please let me know if you have questions or need any additional information. Thank you, Joe Lastufka Information and Data Controller R � ) ��' Cell: (907) 227-8496) Office: (907) 564-4091 BP Exploration AlaskaI900 E. Benson Blvd.Room: 788DIAnchorage, AK 1 Well Slimhoie CDR2-AC 4 Ram BOP Schematic Date 2144ov-17 Quick Test Sub to Otis -1.1 ft r--.`._ - - - - -'- - ,:a Topof7"Otis lir Ai °'31 F CDR2 Rig's Drip Pan ' Distances from top of riser Excluding quick-test sub 7-1/16"5k Flange X 7"Otis Box Top of Annular I 6.0 ft +I _ .._. ';Hydril 7 1/16" Top of Annular Element I 6.7 ft I Annular Bottom Annular 8.0 ft ► ® „ Blind/Shear CL Blind/Shears I 9.3 ft I ",: Vas ".. 1 2"Pipe/Slips CL 2"Pipe/Slips I 10.1 ft I ► B1 I B2 B3 I B4 Choke Line Kill Line 000 wlAl em.. ♦ Ai 71 ie R ♦ 1 1 ws Iliall a .i Ilk 41k.1r Cross�ll• •a• ie IrPYi ISMOINSi? III III 2-38"v 3-1 2"Vf3Rs at Cl-2-3/8"x 3-1/2"VBRs I 12.6 ft 1 ► . , 2"Pipe/Slips I, V CL 2"Pipe/Slips I 13.4 ft I _. y V L CL of Top Swab I 16.0 ft tb,, 1'--'-Swab Test Pump Hose • . e T1 ifT2 CL of Flow Cross I 17.4 ft •� 04%114 1 4 ^Master CL of Master I 18.8 ft I IIIII LDS I ( - 1:4 110 IA 'ars &i, OA II .1 I IIII I. LDS I 1 MEM Ground Level I I • Wallace, Chris D (DOA) From: Regg,James B (DOA) Sent: Monday, December 4, 2017 4:17 PM To: Wallace, Chris D (DOA) Subject: FW: NOT OPERABLE: Producer 18-11B (PTD#2131950) Inner Annulus Exceeded NOL after tubing patch was pulled Jim Regg Supervisor, Inspections AOGCC SCANNED s 4. 333 W.7th Ave,Suite 100 Anchorage,AK 99501 907-793-1236 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information. The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 907- 793-1236 or jim.regg@ialaska.gov. From:AK, GWO Well Integrity Engineer[mailto:AKGWOWellsiteEnginee@bp.corn] Sent: Monday, December 4, 2017 4:10 PM To: Regg,James B (DOA)<jim.regg@alaska.gov> Cc:AK,GWO Well Integrity Well Information<akgwowellintegritywe@bp.com> Subject: NOT OPERABLE: Producer.18-11B (PTD#2131950) Inner Annulus Exceeded NOL after tubing patch was pulled Mr. Regg, Producer 18-11B(PTD#2131950)was made not operable on 12/03/17 after slickline pulled a tubing patch for upcoming perforating work.The plan was for them to secure the well with a tubing tail plug once the patch was pulled. However, before they could get the plug set excessive winds forced them to lay down the equipment. With the patch out,the well has TxIA communication and exceeded NOL with the inner annulus pressure reported to be 2300 psi. When the weather permits, slickline will be rigging back up to set a tubing tail plug and secure the well. Let me know if you have any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization—Alaska Office:907-659-8110 Cell:307-399-3816 1 STATE OF ALASKA IllSKA OILAND GAS CONSERVATION COMMIS SPORT OF SUNDRY WELL OPERATI 1. Operations Performed Abandon ❑ Plug Perforations H Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate H Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: Set CIBP H 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number. 213-195 3. Address: P.O.Box 196612 Anchorage, Development H Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21181-02-00 7. Property Designation(Lease Number): ADL 028321,028302&028307 8. Well Name and Number: PBU 18-11B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 19493 feet Plugs measured 18717 feet true vertical 8625 feet Junk measured None feet Effective Depth: measured 18717 feet Packer measured 12896 feet true vertical 8700 feet Packer true vertical 7754 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 48-128 48-128 1490 470 Surface 2461 13-3/8" 46-2508 46-2508 5380 2670 Intermediate 2630 9-5/8" 44-2674 44-2674 6870 4760 Liner 10922 7" 2525-13447 2525-8202 7240 5410 Liner 6477 4-1/2" 13015-19492 7848-8625 9020 8540 Perforation Depth: Measured depth: 16346-19378 feet sCiktiti True vertical depth: 8683-8641 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr85 42-13017 42-7850 Packers and SSSV(type,measured and 4-1/2"HES TNT Perm Packer 12896 7754 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 629 44030 20 400 978 Subsequent to operation: 964 20120 64 1200 916 14.Attachments:(required per 20 AAc 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations H Exploratory 0 Development H Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil H Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 317-189 Authorized Name: Stone,Christopher Contact Name: Thompson,Ryan Authorized Title: //��D�S 2&18 PE D Contact Email: RYAN.THOMPSON(�bp.com Authorized Signature: I 1(�1 liftt Date: 1��ID Contact Phone: +1 907 564 4535 Form 10-404 Revised 04/2017 VTI— 31901 'AlR E'D?t n �,v FEE ;.. �7 uf18 Submit Original Only L • Daily Report of Well Operations 18-11 B ACTIVITYDATE SUMMARY ***WELL FLOWING ON ARRIVAL***(profile mod) SD HIGH AT SURFACE DUE TO PARAFFIN AT 1' SLM LRS PUMPED 45 BBLS OF HOT CRUDE DOWN TUBING RAN 3 1/2" BL-BRUSH &2.80" G-RING TO 2930' SLM 11/30/2017 ***CONT ON 12-1-17 WSR*** T/I/O= 2500/370Nac Temp= S/I (LRS Unit 42 Assist Slickline- Brush and Flush) 11/30/2017 Pumped 45 bbls 180*diesel down TBG ***WSR Continued on 12-01-17*** T/I/O + 2100/400/100. Temp = SI. Tbg & IA FL (SL request). No AL. Unable to get clear shot of Tbg FL due to SL tool being in hole. IA FL @ 2996 (Sat#6, 53 bbls). 12/1/2017 SL in contol of valves upon departure. 15:30 ***WSR Continued from 11-30-17*** Temp= S/I (LRS Unit 42 Assist Slickline- Freeze Protect Flowline) Pumped 2 bbls 60/40 spear followed with 46 bbls down FL for FP, Tags hung on well 12/1/2017 FWHP= 2050/365/Vac **Slickline in control of well upon departure** ***CONT FROM 11-30-17 WSR*** RAN LOOSE 4 1/2" BL-BRUSH & 3.50" G-RING TO PATCH AT 2941' SLM. RAN STIFF 4 1/2" BL-BRUSH & 3.80" G-RING TO PATCH AT 2941' SLM. (minimal brush work) JARRED FOR TOTAL OF 4 HOURS ON PACKER AT 2978' MD- NO MOVEMENT SET 2 3/8"XX-PLUG IN NIPPLE REDUCER AT 13,942' SLM. GOOD DRAWDOWN 12/1/2017 TEST ***CONT FROM 12-1-17 WSR***(profile mod) PULLED 4-1/2" WFD STRADDLE PATCH FROM 2978' MD.(intact) DRIFTED TBG & EQUALIZED XX PLUG @ 13,001' MD WITH 3.80" G-RING & EQ 12/2/2017 PRONG. ***WELL S/I ON ARRIVAL***(profile mod) ATTEMPTED TO PULL 2 3/8"XX-PLUG FROM NIPPLE REDUCER @ 13001' MD 12/4/2017 ***CONT ON 12-5-17 WSR*** ***CONT FROM 12-4-17 WSR***(profile mod) PULLED 4-1/2" NIPPLE REDUCER W/2-3/8"XX PLUG FROM XN-NIPPLE @ 13,001' MD. DRIFTED W/3.70" CENT& S.BAILER TO DEVIATION @ 14,210' SLM.(no sample) SET 4-1/2" PXN PLUG IN XN-NIPPLE @ 13,001' MD. 12/5/2017 PERFORMED PASSING FLOW RESTRICTION TEST ON PLUG.(see log) T/I/O= ssv/1080/0. Freeze protect flowline for slickline. Pumped 5 bbls 60/40, followed by 44 bbls crude down flowline for freeze protection. Pressure flowline to 1500 psi as per DSO. 12/6/2017 FWHP=ssv/1080/0 T/I/O =/1060/Vac. Temp = SI. WHPs (Post bleed). No AL. 12/14/2017 SV, WV, SSV= C. MV(LOTO) = C. IA, OA= OTG. 21:40. T/I/O = SSV/1060/Vac. Temp = SI. TBG & IA FL (SL Req). No AL. Wellhouse has been removed. Unable to get TBG FL due to MV= LOTO. IA FL @ 2996' (Sta#6, DOME, 144 bbls). 12/19/2017 SV, WV, SSV= C. MV= LOTO. IA, OA= OTG. 04:30 ***WELL S/I ON ARRIVAL****(Profile Mod) DRIFTED TO TOP OF PXN @ 13,001' MD (Fluid level 11,100') 12/20/2017 ***CONTINUED ON 12-21-17 WSR*** 12/20/2017 Assist SlickLine (TBG Load) ***WSR continued to 12/21/2017 T/I/O = 1060/1060/Vac. Temp = SI. TBG FL (SL Req). No AL. Wellhouse removed. TBG FL @ 2996' (Sta#6, EMPTY, 45 bbls). 12/20/2017 SV= C. WV, SSV, MV= O. IA, OA= OTG. 05:30 • • Daily Report of Well Operations 18-11B ***CONTINUED FROM 12-20-17 WSR***(profile modification) SET 4-1/2" SLIP STOP CATCHER @ 6,406' SLM MADE 4 ATTEMPTS TO PULL BK-DGLV FROM ST#4 (6,363' MD) RAN 3.50" LIB TO TOP OF CATCHER (picture impression of catcher sub) 12/21/2017 ***JOB IN PROGRESS, CONTINUED ON 12-22-17 WSR*** T/I/0=850/850/vac Temp= FP. Assist SlickLine (Load TBG) Pumped 5 bbls of 60/40 meth followed by 120 bbls of 1% KCL and 3 bbls 60/40 meth to FP surface lines. (SL needed TBG loaded to pull St#4 GLV). 12/21/2017 FWHP=vac/845/vac Valves= SlickLine Assist SlickLine (pre-rig) Road to location, rig up. 12/22/2017 ***Job continued to 12/23/2017 ***CONTINUED FROM 12-21-17 WSR***(profile mod) PULLED BK-DGLV FROM ST#4 (6,363' MD) SET BK-DGLV(extended packing) IN ST#6 (2,996' MD) SET BK-CIRC VALVE IN ST#4 (6,363' MD) PULLED EMPTY SLIP STOP CATCHER FROM 6,406' SLM PULLED PXN PLUG FROM 13001' MD SET 4-1/2" D&D HOLE FINDER @ 3,015' SLM 12/22/2017 ***JOB IN PROGRESS, CONTINUED ON 12-23-17 WSR*** ***CONTINUED FROM 12-22-17 WSR***(profile mod) LRS LOADED IA W/350bbIs INHIBITED KCL LRS LOADED TBG W/230bbIs INHIBITED KCL LRS FREEZE PROTECTED IA W/ 112 bbls DIESEL LRS FREEZE PROTECTED TBG W/32 bbls DIESEL SET SLIP STOP CATCHER @ 6,408' SLM PULLED BK-CIRC VALVE FROM ST#4 (6,363' MD) SET BK-DGLV W/ EXTENDED PACKING IN ST#4 (6,363' MD) PULLED BK-DGLV FROM ST#6 (2,994' MD)(***Pocket left open***) PULLED SLIP STOP CATCHER FROM 6,408' SLM 12/23/2017 ***WELL S/I ON DEPARTURE, DSO NOTIFIED*** ***Job continued from 12/22/2017. T/I/0=1140/1140/vac Temp= FP. Pumped 5 bbls of 60/40 meth down IA followed by 350 bbls of inhibited KCL, followed by 2 bbls of 60/40 meth to freeze protect surface lines. Line up down TBG. Pumped 5 bbls of 60/40 meth followed by 235 bbls of inhibited KCL followed by 32 bbls of diesel to freeze protect. Line up down IA. Pumped 113 bbls of diesel down IA to freeze protect. SlickLine on well upon departure. Tag hung. 12/23/2017 T/I/O = SSV/0/0 TEMP = SI, PPPOT-T(TxIA comm) PASS PPPOT-T: Stung into test void 0 psi on void. Monitored void pressure for 10 min, no change in pressure. Unable to pump through void to take returns. Pressure void to 5,000 psi for 30 min THA test. Lost 100 in 15 min, lost 0 psi in second 15 min (PASS) Bled void to 0 psi, R/D 12/23/2017 test equipment. Turn well back over to Slick Line. T/I/O=TWC/0/0. Pre CDR2. Removed 4" Upper Tree and installed CDR Tree#4 with kill line #2. PT to 5000 psi. Pass. Installed temp#72 as IA piggyback. PT to 3500 psi. Pass. ***Job 12/25/2017 Complete***See log. Final WHP's TWC/0/0. T/I/0=400/0/0 Set 4" CIW"H"TWC#438 through tree pre-CDR. FWP's TWC/0/0 see log 12/25/2017 for details T/I/O = TWCNacNac. Temp = SI. WHPs (Pre-Rig). Well prepped for Rig. 12/26/2017 SV= C. MV= 0. IA, OA= OTG. 09:00 hrs. • • North America-ALASKA-BP Page 1 of 6 Operation Summary Report Common Well Name:18-11 AFE No Event Type:WORKOVER(WO) Start Date:12/31/2017 End Date:1/4/2018 SAK000000405(1,056,000.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:CDR-2 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release:1/4/2018 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001058 Active datum:KB @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12/31/2017 00:00 - 06:00 6.00 RIGU P PRE MOVE RIG FROM 18-29 TO 18-11 06:00 - 11:30 5.50 RIGU N PRE BOTH SUBS SPOTTED,DELAY ACCEPTANCE TIME FOR NABORS TO WORK ON THEIR BOPE SMALL HYD LEAK COMING FROM THE AUTO LOCKS AGAIN 11:30 - 14:35 3.08 RIGU P PRE j PULL DOORS AND FOUND THAT A CHIP IN THE THICK PAINT IN THE SEALING AREA WAS ALLOWING A VERY SLIGHT HYD FLUID LEAK WHEN THE RAMS WERE CYCLED OPEN. RIG ACCEPTED-CONTINUE RU OPS 14:35 - 15:45 1.17 RIGU P PRE FLUID PACK TO SHELL TEST 15:45 - 16:30 0.75 RIGU P PRE GOOD SHELL TEST,CALL OUT STATE REP GUY COOK TO WITNESS TEST 16:30 - 00:00 7.50 BOPSUR P PRE PERFORM BOPE TESTAS PER NABORS,BP AND AOGCC -71/16"BOPE CONFIGURATION FROM TOP DOWN. -ANNULAR,BLIND/SHEARS,2-3/8" PIPE/SLIPS,MUD CROSS,2 3/8 X 3-1/7,2-3/8" PIPE/SLIPS. TEST ALL RAMS,250 PSI/LOW,3500 PSI/ HIGH,5 MIN EACH,CHARTED. -TEST CHOKE MANIFOLD VALVES,250/3500 PSI,5 MIN EACH,CHARTED. -TEST ANNULAR PREVENTOR,350 PSI/LOW, 3500 PSI/HIGH,CHARTED. AOGCC REP GUY COOK WITNESSING TEST -PERFORM DRAWDOWN TEST ON ACCUMULATOR. C3-FAIL/PASS B3-FAIL/PASS 1/1/2018 00:00 - 03:00 3.00 BOPSUR P PRE LAY DOWN TEST JOINT SWAP REEL KCL INSTALLED INJECTOR, VALVE CREW TORQUED TREE BOLTS.CHANGE PACK-OFFS 03:00 - 03:15 0.25 BOPSUR P PRE RU AND FLUID PACK FOR IRV,PACKOFFS,C9/ C10 BACKWARDS TEST -250 PSI LOW/3500 PSI HIGH. PASSED WITNESSED BY AOGCC GUY COOK 03:15 - 05:00 1.75 BOPSUR P PRE RACK BACK INJECTOR -INSTALL RISER AND NIGHT CAP IN PREPARATION FOR BLOWDOWN 05:00 - 06:30 1.50 BOPSUR P PRE LOAD VC LUBRICATOR ON THE RIG AND RU 06:30 - 07:00 0.50 BOPSUR P PRE PT LUBRICATOR 07:00 - 07:10 0.17 BOPSUR P PRE GOOD TEST,PULL TWC 07:10 - 08:30 1.33 BOPSUR P PRE TWC PULLED,-400 PSI BELOW THE TWC PULL ABOVE SWAB AND CLOSE MASTER& SWAB BLOW DOWN LINES TO TT AND PU THE LUBRICATOR LTT MASTER&SWAB PU THE LUBRICATOR AND RD TOOLS 08:30 - 09:35 1.08 BOPSUR P PRE PU THE INJECTOR,STAB ON AND PT THE BHI DHCV'S AND QTS Printed 2/22/2018 12:46:27PM `AII depths reported in Drillers Depths* SNorth America-ALASKA-BP S Page 2 of 6 Operation Summary Report Common Well Name:18-11 AFE No Event Type:WORKOVER(WO) Start Date:12/31/2017 End Date:1/4/2018 SAK000000405(1,056,000.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:CDR-2 Spud Date/Time:9/10/1984 12:00:00AM Rig Release:1/4/2018 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001058 Active datum:KB @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 09:35 - 09:55 0.33 BOPSUR P PRE GOOD PT,PREP TO BH KILL WELL AND HOLD A PJSM TO BH KILL WELL 09:55 - 10:10 0.25 PRFADD P OTHCMP ONLINE WITH PUMP TO KILL WELL WHP DOWN TO 263 PSI 10 BBLS NEAT METH 150 BBLS HOT KCI 50 BBLS HI-VIS PILL 140 BBLS HOT KCI 120 BBLS FROM PITS 110:10 - 11:00 0.83 PRFADD P OTHCMP 21 BBLS AWAY CAUGHT FLUID, IAP STARTING TO TRACK 215 BBLS AWAY,PRESSURES HAVE LEVELED OFF WITH Hl-VIS PILL PUMPED- WHP/IAP/OAP=1542/1632M PSI 11:00 - 11:40 0.67 INTWBA P OTHCMP I FLUID AT THE PERFS WITH A LITTLE BUMP IN PRESSURE-WHP/IAP/OAP=1716/1865/0 PSI 11:40 - 12:00 0.33 PRFADD i P OTHCMP 1920 PSI WHP AT 470 BBLS AWAY,SHUT DOWN THE PUMP AND LINE UP TO ESTABLISH A LOSS RATE NABORS CREW CHANG 12:00 - 13:25 1.42 PRFADD P OTHCMP LOSS RATE-8 BPH WAIT ON CREW TO CHANGE OUT,WALK THROUGH THE RIG AND PREP TO PU THE FIRST BHA 13:25 - 13:35 0.17 I PRFADD P OTHCMP SHUT DOWN PUMP AND FLOW CHECK WELL 13:35 - 14:30 0.92 PRFADD P OTHCMP GOOD NO FLOW,PU THE INJECTOR AND RACK BACK HOLD A PJSM TO PU THE BHA 14:30 - 15:20 0.83 PRFADD P OTHCMP MU THE DRIFT LOGGING BHA RATTLING EACH JOINT FILLIING HOLE EVERY 20 MIN 15:20 - 15:40 0.33 PRFADD P OTHCMP 20 JTS RAN KWT DRILL ON LAST JOINT BEFORE CIRCULATING DEPLOYED LAST JOINT,PU SAFETY JOINT AND DEPLOYED,SIMULATE CLOSING 2-3/8" COMBI'S&TIW VALVE,WELL SECURED IN 3:59.HOLD AAR AND DISCUSS OPS AFTER WELL IS SHUT IN.THANKED THE RIG HANDS FOR DOING AN EXCELLENT JOB GETTING THE SAFETY JOINT DEPLOYED. 15:40 - 15:55 0.25 PRFADD P OTHCMP RU HEAD PIN AND CIRCULATE TO VERIFY THE SCALE HAS NOT PLUGGED OFF THE MOTOR 15:55 - 16:55 1.00 PRFADD P OTHCMP PUMPED 15 BBLS RD SAFETY JOINT AND CONTINUE MU PIPE 16:55 - 18:00 1.08 PRFADD P OTHCMP 40 JOINTS RAN,RU SAFETY JOINT AND CIRCULATE 18:00 - 18:45 0.75 PRFADD P OTHCMP CONTINUE RUNNING WORKSTRING RUN TOTAL OF 64 JOINTS OF 1-1/4"CSH MAKE UP BHI TOOLS. BREAK CIRCULATION TO VERIFY MOTOR/ MILL CLEAR Printed 2/22/2018 12:46:27PM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP • Page 3 of 6 Operation Summary Report Common Well Name:18-11 AFE No Event Type:WORKOVER(WO) Start Date:12/31/2017 End Date:1/4/2018 SAK000000405(1,056,000.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:CDR-2 Spud Date/Time:9/10/1984 12:00:00AM Rig Release:1/4/2018 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001058 Active datum:KB©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 18:45 22:45 4.00 PRFADD P 14,000.00 OTHCMP RIH WITH DRIFT BHA#1 -RATE:0.27 BPM IN,0.79 BPM OUT.CIRC PRESSURE:120 PSI -MUD WEIGHT:8.44 PPG IN,8.22 PPG OUT PU WEIGHT AT 3000'21K/ RIH WEIGHT AT 3K -PU WEIGHT AT 4000'24K/RIH WEIGHT AT 4.4K -STOP AND ADJUST SADDLE BOLTS AND GOOSENECK. -PU WEIGHT AT 4300' 25K/RIH WEIGHT 8K PU WEIGHT AT 5000' 32K/RIH WEIGHT 9.7K PU WEIGHT AT 6200' 38K/RIH WEIGHT 14.7K STRIPPER LUBE NOT LUBING PACK-OFF. STOP AND FIX -PU WEIGHT AT 8070' 40K/RIH WEIGHT 20K PU WEIGHT AT 9179' 43K/RIH WEIGHT 20K PU WEIGHT AT 11106' 48K /RIH WEIGHT 20K PU WEIGHT AT 12068' 50K/RIH WEIGHT 20K PU WEIGHT AT 13151' 55K/RIH WEIGHT 22K '-PU WEIGHT AT 14003' 57K/RIH WEIGHT 24k 22:45 - 00:00 1.25 PRFADD P 18,000.00 OTHCMP DRY DRIFT FROM 14000'. BREAK CIRCULATION EVERY 1000' -PU WEIGHT AT 15000' 60K/RIH WEIGHT 24K -PU WEIGHT AT 16000' 65K/RIH WEIGHT 24K -PU WEIGHT AT 17000' 65K/RIH WEIGHT 25K PU WEIGHT AT 18000' 65K/RIH WEIGHT 23K 1/2/2018 00:00 - 01:00 1.00 PRFADD P 18,200.00 OTHCMP LOG TIE IN FROM 18140'TO 18202.57 WITH A -8'CORRECTION. LOG CCL FOR COLLAR LOCATION 01:00 - 01:30 0.50 PRFADD P 18,200.00 OTHCMP DRY DRIFT FROM 14000'. BREAK CIRCULATION EVERY 1000' CONTINUE IN HOLE WITH BHA#1 FROM 18200'MD TO 18800'MD -RATE:0.00 BPM IN,1.0 BPM OUT.CIRC PRESSURE:0 PSI -CIRCULATE ACROSS TOP WHILE RIH TO BOTTOM -MUD WEIGHT:8.43 PPG IN,8.43 PPG OUT 01:30 - 01:45 0.25 PRFADD P 18 800.00 OTHCMP PULL OUT OF HOLE -PU WEIGHTS OFF BOTTOM 70-72KAT 35 FPM -BRING RATE UP TO 1.70 BPM. -CIRCULATE 36 BBLS AROUND TO EDC -STOP AND OPEN EDC 01:45 - 02:30 0.75 PRFADD P 18,800.00 OTHCMP PULL OUT OF WELL CIRCULATING TO FLOWBACK TANK -MUD WEIGHT:8.43 PPG IN,8.43 PPG OUT -RATE:3.02 BPM IN,2.54 BPM OUT -SLOW PULL SPEED TO 35 FPM DO TO 70K PICKUP OF BOTTOM. 02:30 - 02:40 0.17 PRFADD P 18,800.00 OTHCMP PERFORM 10 MIN DYNAMIC FLOW CHECK -0.29 BPM IN /0.19 BPM OUT 7 BPH LOSS RATE. - 8.38 PPG IN /8.42 PPG OUT Printed 2/22/2018 12:46:27PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP S Page 4 of 6 Operation Summary Report Common Well Name:18-11 AFE No Event Type:WORKOVER(WO) Start Date:12/31/2017 End Date:1/4/2018 SAK000000405(1,056,000.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:CDR-2 Spud Date/Time:9/10/1984 12:00:00AM Rig Release:1/4/2018 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001058 Active datum:KB @64.50usft(above Mean Sea Level) Date From-To I Hrs Task Code i NPT Total Depth Phase Description of Operations (hr) (usft) 02:40 - 06:35 3.92 PRFADD P 18,800.00 OTHCMP BRING FLUID IN. BLOW DOWN TIGER TANK LINE POOH 3.73 BPM IN/3.59 BPM OUT 11 BPH. 8.44 PPG IN /8.43 PPG OUT 06:35 - 06:45 0.17 PRFADD P 18,800.00 OTHCMP' FLOW CHECK WELL&PJSM TO WLD THE BHA 06:45 - 07:35 0.83 PRFADD P 18,800.00 OTHCMP GOOD NFC,PU THE INJECTOR AND LD THE MWD 07:35 - 10:15 2.67 PRFADD P 18,800.00,, OTHCMP MWD OOH,LD CSH • 10:15 - 11:10 0.92 PRFADD P 18,800.00 OTHCMP CSH&MOTOR OOH,LOST 13 BBLS WHILE TRIPPING PIPE . RU A SET OF RENTAL 65T ELEVATORS GBR TO SEE IF THEY WILL WORK WITH OUR BAILS AND THE HES NORWEGIAN CLAMP FOR 11-39 11:10 - 11:30 0.33 PRFADD ; P '. 18,800.00 OTHCMP ELEVATORS WILL WORK,RD ELEVATORS AND MU ELEVATORS FOR 1-1/4"CSH HOLD A PJSM TO MU CIBP BHA 11:30 - 15:15 3.75 PRFADD P 18,880.00 OTHCMP PU THE CIBP RUNNING TOOLAND MU TO THE FIRST JOINT CREW CHANGE START RUNNING CSH WORK STRING 15:15 - 15:45 0.50 PRFADD P 18,800.00 OTHCMP ALL CSH RAN,MU THE BHI MWD,STAB ON AND TAG UP • 15:45 - 19:45 4.00 PRFADD. P 18,800.00 OTHCMP RIH WITH EDC OPEN TRIPS SET AT 90 PSI HIGH WARNING,100PSI TRIP AND 150PSI SHUT DOWN RIH@80FPM,.51 BPMIN W/.81 BPM OUT. 8.38 PPG IN/8.42 PPG OUT. -WT CHECK @ 16,655',UP T- 65K,DOWN WT-25K. 19:45 - 20:00 0.25 PRFADD P 18,800.00 OTHCMP LOG TIE IN F/18,150'.-18,207' -MINUS 9'CORRECTION. 20:00 - 20:30 0.50 PRFADD P 18,800.00 OTHCMP CONTINUE IN HOLE @ 60 FPM. -WT CHECK @ 18,700'.UP WT-65K.DOWN • WT 23K,PUMPING.5 BPM/145 PSI. -RUN IN HOLE TO 18,718.7 KILL PUMP AND PICK UP TO 60K. -CLOSE EDC.BRING ON PUMP,SEE CIBP SET @ 3300 PSI. -SET DOWN ON CIBP,4-5K,GOOD. TOP OF BP @ 18,717'. -PICK UP CLEAN @ 65K.OPEN EDC. -STATIC FLOW CHECK.(10 MIN),WELL BORE STABLE,LOSS RATE 7-8 BPH. 20:30 - 00:00 3.50 PRFADD P 18,800.00 OTHCMP POOH W/CIBP RUNNING ASSEMBLY. -PAINT FLAG @ 18,048',(16,000'EOP). -POOH @ 50 FPM/.92 BPM IN/.54 BPM OUT. 1/3/2018 00:00 - 02:00 2.00 PRFADD P 18,800.00 OTHCMP CONTINUE TO POOH W/CIBP RUNNING ASSEMBLY. -FLOW CHECK AT SURFACE,WELL BORE STATIC. -8.4 PPG BRINE IN AND OUT, LOSS RATE 7- 8 BPH. 02:00 05:00 3.00 PRFADD P 18,800.00 OTHCMP BREAK OFF INJECTOR.UD UPPER QUICK CONNECT AND MWD. -FILL HOLE,3.3 BBLS TO FILL AFTER 30 MIN. UD 1 1/4"CS HYDRIL TUBING. Printed 2/22/2018 12.46:27PM *All depths reported in Drillers Depths* • North America-ALASKA-BP S Page 5 of 6 Operation Summary Report Common Well Name:18-11 AFE No Event Type:WORKOVER(WO) Start Date:12/31/2017 End Date:1/4/2018 SAK000000405(1,056,000.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:CDR-2 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release:1/4/2018 Rig Contractor:NABORSALASKA DRILLING INC. BPUOI:USA00001058 Active datum:KB @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 05:00 - 05:35 0.58 PRFADD P 18,800.00 OTHCMP CSH AND CIBP RUNNING TOOLS OOH,LOAD OUT TOOLS AND PREP TO PUMP SLACK OUT 05:35 - 05:50 0.25 PRFADD P 18,800.00 OTHCMP PJSM TO BOOT ELINE AND PREP TO PUMP SLACK OUT 05:50 - 06:30 0.67 PRFADD P 18,800.00 OTHCMP BOOT ELINE AND RUN 1 JT OF 2-3/8"PH6 TO ENSURE WIRE IS PUMPED THROUGH THE STACK 06:30 - 07:25 0.92 PRFADD P 18,800.00 OTHCMP PU INJECTOR AND CHECK LENGTH OF SLACK PUMPED OUT 326'OF 375',CUT WIRE AND SEAL CUT OFF DIMPLE CTC AND MU BTT EXTERNAL CTC 07:25 - 08:20 0.92 PRFADD P 18,800.00 OTHCMP PULL TEST THE CTC TO 37K RACK BACK INJECTOR HOLD A PJSM TO LOAD AND PUMP 3/4"BALL 08:20 - 09:00 0.67 PRFADD P 18,800.00 OTHCMP BALL LOADED,PUMP BALL AROUND 09:00 - 09:50 0.83 PRFADD P 18,800.00 OTHCMP SHUT DOWN PUMP AND RECOVERED DRIFT BALL,MU THE X-O&SWIVEL TO THE CTC AND RACK BACK INJECTOR 09:50 - 10:15 0.42 PRFADD P 18,800.00 OTHCMP HOLD A PJSM TO MU THE PERF GUN BHA 10:15 - 12:00 1.75 PRFADD P 18,800.00 OTHCMP -MU PERF GUNS 12:00 - 12:45 0.75 PRFADD P 18,800.00 OTHCMP ALL PERF GUNS RAN,MU THE GUN RUNNING TOOLS 12:45 - 16:35 3.83 PRFADD P 18,800.00 OTHCMP BHA RAN,TAG UP,SET DEPTH AND RIH 16:35 - 16:40 0.08 PRFADD P 18,800.00. OTHCMP STOP AT FLAG(ELEC DEPTH=16936.4') CORRECT DEPTH TO 16929.4'(-5.8'FLAG CORRETION-1.2'BULLNOSE TO BOTTOM SHOT) 16:40 - 16:50 0.17 PRFADD P" 18,800.00 OTHCMP DEPTH CORRECTED TO BOTTOM SHOT,RIH TO 16950'100'ABOVE SHOT DEPTH 16:50 - 17:00 0.17 PRFADD P 18,800.00 OTHCMP START SEQUENCE TO FIRE GUNS 17:00 - 17:05 0.08 PRFADD P 18,800.00 OTHCMP RIH TO 17,050'BOTTOM SHOT DEPTH AND WAIT FOR GUNS TO FIRE STOP AT 17,050',APPLY 150 PSI WHP 17:05 - 18:30 1.42 PRFADD P 18,800.00 OTHCMP GUNS FIRED,POOH INCREASE RATE TO 1.5 BPM AND 200 PSI WHP LOST 3 BBLS AND STARTED BUILDING WHP THEN GOT RETURNS 18:30 - 22:00 3.50 PRFADD P 18,800.00 OTHCMP STOP AT 13,000'PERFORM DYNAMIC FLOW CHECK. -WELL BORE STATIC,8.4 PPG BRINE IN AND OUT. -LOST(2)BBLS DURING FLOW CHECK. -LOSS RATE 12 BPH.CONTINUE TO POOH. -PUMPING 1.3 BPM DOWN COIL©325 PSI. 22:00 - 23:00 1.00 PRFADD P 18,800.00 OTHCMP FLOW CHECKAT SURFACE,10 MINUTES. -WELL BORE STATIC,8.4 PPG IN AND OUT,7 BPH LOSS RATE. -JOG BACK IN HOLE TO 1100',CBU TO ENSURE GUN GAS OUT. -POOH TO SURFACE,FLOW CHECK 10 MINUTES,5 BBLS TO FILL. -PJSM W/RIG HANDS AND HALLIBURTON WHILE FLOW CHECKING. -EMPHASIS ON WATCHING FOR SHARP �EDGES WHILE LAYING DOWN GUNS. Printed 2/22/2018 12:46:27PM *AII depths reported in Drillers Depths* SNorth America-ALASKA-BP I Page 6 of 6 Operation Summary Report Common Well Name:18-11 AFE No Event Type:WORKOVER(WO) Start Date:12/31/2017 End Date:1/4/2018 SAK000000405(1,056,000.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:CDR-2 Spud Date/Time:9/10/1984 12:00:00AM Rig Release:1/4/2018 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001058 Active datum:KB @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code ' NPT Total Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 PRFADD P 18,800.00 OTHCMP BREAK OFF INJECTOR AND SWIVEL. -TROLLEY BACK INJECTOR. -LAY DOWN(6)JTS 2 3/8"PH-6. -FILLING HOLE EVERY 30 MINUTES...4 BBLS TO FILL. 1/4/2018 00.00 - 02:00 2.00 PRFADD P 18,800.00 OTHCMP CONTINUE TO LAY DOWN PERFORATING ASSEMBLY. -FILLING HOLE EVERY 30 MINUTES, AVERAGING 3.8 BBLS TO FILL. -LAY DOWN PERF GUNS,ALL SHOTS FIRED. NO GAS ENCOUNTERED. 02:00 - 05:30 3.50 DISPL P 18,800.00 1 POST SPOT UP LITTLE RED AND PRE JOB WITH CREW. -EMPHASIS ON PROPER VALVE ALIGNMENT AND PRESSURE CROSS CHECK LIST. -RIG UP AND PRESSURE TEST LINES -PRESSURE TEST TO 4000 PSI/5 MIN/ GOOD. -BULLHEAD DOWN TUBING WITH DIESEL,(80 DEGREES). -2 BPM/773 PSI. W/20 BBLS AWAY,2 BPM/ 1240 PSI 80 DEG F. -35 BBLS AWAY,2 BPM/1350 PSI,80 DEG F. 55 BBLS AWAY,2 BPM/1500 PSI.80 DEG F. -BLED BACK 5 BBLS.RIG DOWN LITTLE RED. 05:30 - 05:35 0.08 DISPL ' P 18,800.00 POST NFC WELL,GOOD NF PULL NIGHT CAP AND INSTALL TWC 05:35 - 06:00 0.42 DISPL P 18,800.00 POST 1 TWC SET MASTER AND SWAB CLOSED,RD T-BAR AND START RDMO OPS 06:00 - 07:00 1.00 DISPL P 18,800.00 POST MU A NOZZLE TOP JET BOP'S 07:00 - 09:30 2.50 DISPL P 18,800.00 POST PU THE INJECTOR,REMOVE NOZZLE AND BLOW DOWN COIL AND ALL SURFACE LINES 09:30 - 12:00 2.50 DISPL P 18,800.00 POST LTT&REMOVE MPD LINE GREASE STACK RU STACK TO TOP DRIVE 12:00 - 13:00 1.00 DISPL P 18,800.00 POST ND BOP STACK 13:00 - 14:00 1.00 DISPL P 18,800.00 POST NU TREE CAP AND TEST TREE CAP TESTED RIG RELEASED AT 14:00 Printed 2/22/2018 12.46:27PM *All depths reported in Drillers Depths* • • Daily Report of Well Operations 18-11B ACTIVITYDATE SUMMARY T/I/O=TWC/0/0. Post CDR2. Removed kill line#2 and blinded tree companion. PT to 5000 1/4/2018 psi. Pass. ***Job Complete***See log. Final WHP's TWC/0/0. T/I/O=0/0/0 CDR2 Completion Set 4" CIW"H" TWC#429 through stack with T-bar. ***Job 1/4/2018 Complete*** Final WHP's TWC/0/0 T/1/O=TWC/0/0 Post CDR2 R/D CDR2 Tree#4. R/U 4" CIW Production tree. PT'd MVx SSV Low300psi/ High 5000psi. (Passsed) Change Out With Day Shift. ***Job In 1/6/2018 Progress*** FWHP TWC/0/0 T/I/O = TWC/0/0. Attempted to pull 4" H TWC, tagged @125"w/short pulling tool could not engage tool profile due to debris. RD Piggy back IA, RU blind flange torqued to 250 FT LBS, PT'd flange against gate to 2500 PSI (Pass). FWPs = TWC/0/0. RDMO. ***Job 1/7/2018 Incomplete***. (LRS Unit 46 -Assist Valve Crew: Flush BPV) Load fluid and road to location, ***WSR 1/10/2018 continued on 01/11/2018*** T/I/O=TWC/0/0. R/U Pump Stinger Assm. LRS pummped 9 bbl of diesel down on TWC. R/D LRS Eqip. & R/U CIW Luricator W/ H-plug Pulling tool. PT'd Lubricator Low 300psi, High 3500psi. Pulled 4" H -TWC#429 @ 128". RDMO ***Job Complete*** FWHP=0/0/0 1/10/2018 See Log For Details. T/I/O 0/0/0 Assist valve crew with BPV. Pumped 9 bbls of 90*dsl down stinger in TBG and Taking returns out of the wing valve into 500 bbl open top tank to clean BPV for valve crew 1/11/2018 to pull. Valve positions= SV, WV= Closed, SSV= Open, IA/OA= OTG FWHP= 0/0/0 ***WELL S/I ON ARRIVAL****(post cdr) TRAVEL TO DS 18-11. 1/23/2018 ***JOB CONTINUED ON 1/24/18*** T/I/0=100/300/0 Temp=Sl (LRS Unit 72 -Assist Slickline: Load and Test) Pumped 5 bbls 60/40 meth and 190 bbls of 50*crude down IA for load. 1/24/2018 ***Job Cont to 01-25-2018 WSR*** T/I/O=0/0/0 SI (LRS Unit 46 -Assist Slickline: Brush & Flush) Pumped 254 bbls crude down TBG for brush and flush. ***Job delayed, no fluid*** SL on well upon departure CVs OTG 1/24/2018 FWHP=300/400/0 ***JOB CONTINUED FROM 1/23/18****(profile modification) DRIFTED TO XN-NIPPLE @ 13,001' MD W/3.80" GAUGE &4-1/2" BRUSH (ctd rig metal shaving packed in brush) BRUSHED & FLUSHED TBG W/3.50" GAUGE RING & BRUSH WHILE LRS PUMPED 250bb1 CRUDE SET 4-1/2"x 2-3/8" NIPPLE REDUCER IN XN-NIPPLE @ 13,001' MD(oal = 37", 1.875 x- nipple) RAN 4-1/2" CHECK SET TO NIPPLE REDUCER (confirmed lock shut). LRS LOADS IA W/ 190 BBLS OF CRUDE. 1/24/2018 ***JOB CONTINUED ON 1/25/18*** ***JOB CONTINUED FROM 1/24/18****(profile modification) SET 2-3/8"XX PLUG (x eq device, 4x3/16" ports, 22" lih) IN NIPPLE REDUCER @ 12,959' SLM / 13,001' MD. C-MIT T/IA TO 3,000 PSI PASSES (see log). 1/25/2018 ***WELL S/I ON DEPARTURE*** ' • I Daily Report of Well Operations 18-11B ***Job Cont from 01-24-2018 WSR*** (LRS Unit 72 -Assist Slickline: Load &Test) Pumped 5 bbls 60/40 meth and 320 bbls 90*crude down Tbg for load. CMIT-TxIA***PASSED***to 3157/3192 psi. Pumped 7.4 bbls crude down Tbg to reach test pressure of 3267/3312 psi. In the 1st 15 mins Tbg / IA lost 81 psi/81 psi and Tbg /IA lost 38 psi/39 psi in 2nd 15 mins for a total loss of 119 psi and 120 psi for total 30 min test. Bled Tbg / IA to 400/410 psi. Got back —7 bbls. SLine in control of well per LRS departure. ***Tags hung on MV and IA***, ***AFE sign hung on WV*** 1/25/2018 FWHP's=400/410/0 IA,OA=OTG ***WELL S/I ON ARRIVAL*** (SLB ELINE - PKR) INITIAL T/I/O = 50/120/0. MIRU SLB E-LINE. 1/30/2018 ***JOB CONTINUED ON 31-JAN-2018*** ***JOB CONTINUED FROM 30-JAN-2018*** (SLB ELINE - PKR) RIH W/ BKR 45KB LOWER STRADDLE PACKER. OAL = 22'. OAW = 300 LBS. MAXOD = 3.7" SET LWR BKR PKR MID ELEMENT @ 3017'. TOP OF PACKER AT 3014.9'. MIN I.D. = 2.45". TIED INTO SLB MEMORY LDL DATED 2-SEP-2014. RDMO. WELL S/I ON DEPARTURE. FINAL T/I/O = 150/120/0 1/31/2018 ***JOB COMPLETE 31-JAN-2018*** T/I/O= 180/10/vac Temp= FP Assist SlickLine (MIT-IA) Pumped 9 bbls of ambient crude during MIT-IA attempt. Turned into trouble shooting GLV's. TxIA tracked from the IA into the TBG but not from the TBG to the IA. SlickLine change out GLV they think may be live to a 2/11/2018 dummy. ***Job continued to 2/12/2018 ***WELL S/I ON ARRIVAL*** (Profile modification) TAG BAKER 45 KB LOWER PACKER AT 3,015' MD W/3.80" CENT, L.I.B. SET BKR 45 KB UPPER PACKER W/WFD SMR-1B MANDREL (id = 1.92")AT 2,981' MD. TOP OF PACKER AT 2,981' MD, GAS LIFT MANDREL (BK-DGLV installed) AT 2,998' MD. LRS ATTEMPTED MIT-IA BUT TUBING TRACKED. BLED IA DOWN &TUBING HELD. 2/11/2018 PULL BK-LGLV(Suppose to be DGLV per WFD) FROM ST#6 (2,998' MD). ***CONTINUED FROM 2/11/18 WSR*** (Profile modification) LRS PERFORMED SUCCESSFUL MIT-IA TO 2693 PSI. PULL BK-DGLV FROM POGLM &SET BK-LGLV IN POGLM (ST#6, 2,998' MD). EQUALIZE & PULL 2-3/8"XX PLUG BODY FROM 12,987' SLM/ 13,001' MD. ***WELL S/I ON DEPARTURE, NOTIFIED DSO OF WELL STATUS*** 2/12/2018 NOTE: K-KOT USED FOR GAS LIFT IN WFD SMR-1B MANDREL. **WSR continued from 2/11/2018. MIT-IA to 2755 psi, target 2500, max applied 2750 ***PASSED***. Pumped 4.2 bbls of ambient crude down IA to reach test pressure. 1st 15 min IA lost 44 psi, 2nd 15 min IA lost 18 psi, bled back —4.2 bbls crude. Tags hung. SlickLine on well upon departure. 2/12/2018 FWHP=61/7/0 **Slickline in control upon departure** !WE= ` CNVH4-1/16" • 1 8-1 1 B sAok A NOTES:14WELL ANGLE>70°0 9038'. AR= BAKER C OKB.HEV= 56' BF.a.EV= KOP= 2674 ' 2014' —14-1/2"HES X NP,D=3.813" Max Angle 98°@ 19174' 20"CONDUCTOR J , Datum MD= N/A 2524' —9-5/8"X 7"BKR IMBUE ZXPN LIP w/TACK LatumNhnn W D= 8800'SSI SLEEVE D=6.19" I 13-3/8"CSG,72#,L-80 BTC,D=12.347-j—{ 2600' 2640' —19-5/8 X 7"FLEXLOCK lNR HGR D=6.22" li 9-5/8"WHPSTOCK(05/13/14) 2674' MLLOUT WINDOW(18-1IB)2674'-2691 [9-5/8'CSG,47#,L-80 NSCC,D=8.681" — —2674' 45 KB UPPER STRADDLE POGLM, H2981' GAS UFT MANDRELS ST AD IVO DEV TYPE VLV LATCH FORT DATE D=1.901"(02/12118) NM _ 1.1,41 *6 2996 2994 12 KBG-2 `SO BK 20 02/19/18 45 KB BKR LOUVER STRADDLE PKR w/SNAP 3015' — 5 4638 4239 62 KBG-2 DMY BK 0 07/06/14 LATCH RECEPTACLE&MULE SHOE, L *4 6363 5089 59 KBG-2 "DM'( BK 0 12/23/17 D=2.45"(01/31/18) 3 7673 5753 60 KBG-2 DM' BK 0 07/06/14 Minimum ID = 1.875" 13001' 2 8613 6204 65 KBG-2 DMY BK 0 07/06/14 1 9013 6357 70 KBG-2 DMY BK 0 07/06/14 4-1/2" X 2-318" NIPPLE REDUCER STA#4=DMY HAS 130ENEED PACKING TOP OF CEM 4T(06/09/14) --3 12666' STA#6=FOGI..M t� ' 12866' 4-112"HES X NP,D=3.813" Ar I•J ��4 12896' H 7"X 4-1/2"TNT PKR,ID=3.856" '•I.i'4 ►.tI""/ "44;: ' I.�r 12929' 4-1/2"HES X NP,D=3.813" t�N.0; E. 13001' �4 112"HES XN NP,D=3.725" 4 0�� 13001' -�4-1/2"X 2-3/8"NP RED,D=1.875"(01/24/18) *� I11 s1. ;to %I. f4 TOP OF 4-1/2"LM 13014' -1 I`�l 13014' 7'X 5"BKR I-RD-E ZXP LIP w/TEBACK ;r, F,44;e ilI / \ I.1� SLEE1/E D=4.34" 4-1/2'TBG, 12.6#,13CR-86 VAM TOP HC, -3 13017' f' t�� v c/ j,ik 13017' ,—I4-1/2"WLEG,D=3,883"{ .0152 bpf,D=3.958" ',I I1 * 1 - .►.A, /4.v.14 --3 ELMD TT NOT LOGGED 7"LNR,26#,L-80 VAM TOP HC, —I 13446' '1:1 `'=''' I 13048' —I5"X 4-1/2"XO BUSHING,0=3.86" .0377 bpf,D=6.276" 'I.e t e*I •A t 13038' H T X 5"BKR FLEXLOCK LMR HGR,D=4.31" PERFORATION SUMMARY 1 VII REF LOG: �Ip M 13606' j—6.125"OPEN HOLE SIDETRACK I ANGLEATTOP PEW:910 0 16346Ar• ' Note:Refer to Roduction DB for historical perf data ♦ •I1 SIZE SPF NTBZ1/AL Opn/Sqz SHOT SQZ • oI' 14466'�—i TD PLOT HOLE 4-1/2" 5 13135-13140 S 06/06/14 06/07/14 =� 2-3/4" 6 16346-17050 0 01/03/18 i 15007&16713' —4-1/2-PUP JOINT'S w/RA TAG N 2-7/8" 6 17280 17630 0 07/04/14 • �_ STOP RNG 1'FROM PIN OF RI'Jr 2-7/8" 6 17850-18180 0 07/04/14 18717' —I4-1/2"CIBP(01/02/18) 2-7/8" 8 18230-18550 0 07/04/14 I* 2-7/8" 6 18850-19000 C 07/04/14 1+M I•417 19195' 45KB PKR w/2-3/8"X NP 0 19206',D=1.875" 2-7/8" 6 19330 19360 C 09/22/14 'I� (01/25/16) 2-7/8" 6 19358-19378 C 09/18/14 1 ,I• 11• .`+ 19234'-19239' —45 KB PKR w/1/2"ORIFICE = D=.05"(09123/14) PBTD --3 19378' 4-1/2"LN2 12.6#,13CR 85 VAM TOP, H 19491' .166X .0152 bpf,D=3.958" DATE REV BY CONVENTS DATE REV BY COM NENTS PRUDHOE BAY UNrr 09/17/84 RWN 41 INITIAL COMPLETION 02/01/18 KFANJMD SET LOWS,STRADDLE FKR(01/31/18) WELL: 18-11B 11/07109 NOF 1C1 CTD SIDETRACK(18-11A) 02/26/18 MTI-VJAD SET UPPER STIIDL PKR 8 MOW/PULL PLUG PERMIT No: 2131950 07/08/14 P-272 SIDETRACK(18-118) AR No: 50-029-21181-02 01/22/18 MLYJMD PERFS SHOT BY N-CDR2(01/03/18) SEC 19,T11N,R15E,1278'Fly&431'FWL 01/29/18 M VJMD CBP SET BY N-CDR2(01/02/18) 01/29/18 ZV/JMD SET NP RED&XX RUG(01/25/18) BP Exploration(Alaska) • PTS 2/3 9S• � Loepp, Victoria T (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent: Thursday, December 21, 2017 3:36 PM To: Loepp,Victoria T(DOA) Cc: Leemhuis,Jacob; Browning,Zachary H Subject: FW: Updated BOPE Schematic 11-39 (PTD#214-099), 18-11B (PTD#213-195)and 18-29C (PTD#209-055) Attachments: Nabors CDR2 BOPE Stack- Bighole.pdf Follow Up Flag: Follow up Flag Status: Flagged Victoria, Sorry for any confusion. We have another adjustment to the BOPE sketch.This will be the final correction prior to the adperf jobs for these 3 wells. If you have any questions or concerns, please don't hesitate to let me know. Have a safe and Merry Christmas! Thank you, MAR 1 9 2Q13 Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 I 2 BP Exploration Alaskal900 E. Benson Blvd.JRoom: 788D1Anchorage, AK From: Leemhuis,Jacob Sent:Thursday, December 21, 2017 2:12 PM To: Lastufka,Joseph N<Joseph.Lastufka@bp.com> Subject: Updated ROPE Schematic Joe, The next 3 perf wells(18-29C, 18-11B,and 11-39)will be using big coil instead of slim coil. This is an efficiency measure that should save time on these next few perf jobs. The next CTD well will be also using this string so it made sense to pick it up. Thanks, Jacob C. Leemhuis GWO I BP Alaska I Drilling Engineer—CTD & RWO Mobile: +1 (907)223-6792 I Office:+1 (907)564-4989 1 • • Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21-Nov-17 Quick Test Sub to Otis I -1.1 ft "— ` — ` " """— "- Topof7"Otis ( 0.Oft — — —•— —.—.—.—. ® 4 CDR2 Rig's Drip Pan Distances from top of riser Excluding quick-test sub F— 7-1116"5k Flange X 7"Otis Box Top of Annular I 6.0 ft fl L-- . Hydril 7 1/16" Top of Annular Element 6.7 ft Annular Bottom Annular ( 8.0 ft 1 Blind/Shear CL Blind/Shears 9.3 ft 2-3/8"Pipe/Slips CL 2-3/8"Pipe/Slips 10.1 ft 0' B1 I B2 B3 I Bs Choke Line Kill Line °° .• . :I* 7-1/16 :6 *+ •� Mr118 s l 4* 1 mml stow Of 1* A1af to i�� IlipiM121001 Cross III 2-318'x 31 2"VBRs II i CL 2-3/8"x 3-1/2"VBRs 12.6 ft ► 11111Prill,ra '1 2-318"PipelSlips ��. 1 CL 2-3/8"Pipe/Slips 13.4 ft ► 1 ... - 1 1 1 CL of Top Swab 16.0 ft O�� ` Swab Test Pump Hose if T1 , T2 CL of Flow Cross 1 17.4 ft I •i• = •ili.• - PIN ` Master CL of Master 18.8 ft LDS ,. . ,. .. . f►71 IA C4 OA 1 II II I II LDS Ground Levelat ` • • P�OF/7 7. THE STATE Alaska Oil and Gas ti _�� 14 of AL ASK A Conservation Commission .:7,6,-,=_-:---,-,.:-_, i _ - h--___ 333 West Seventh Avenue 1/4 i `- - r Anchorage, Alaska 99501-3572 ' --•----V"R. GOVERNOR BILL WALKER Main: 907.279.1433 '54' AQ. Fax: 907.276.7542 www.aogcc.alaska.gov Ryan ThomsonNKEsCAD (i'1a 3 .1`:, Interventions Engineer BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 18-11B Permit to Drill Number: 213-195 Sundry Number: 317-189 Dear Mr. Thompson: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . "91(A4Foerster Chair DATED this I 7 day of May, 2017. RBDMS L" kAY 1 9 2017 s. STATE OF ALASKA • •ALASKA OIL AND GAS CONSERVATION COMMI ON APPLICATION FOR SUNDRY APPROVALS 20 MC 25.280 1. Type of Request: Abandon 0 Plug Perforations 0• Fracture Stimulate 0 Repair Well 0 Operations shutdown 0 Suspend 0 Perforate 0• Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 213-195' Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development 0 • 3. 9 6. API Number: 50-029-21181-02-00 . 99519-6612 Stratigraphic 0 Service ❑ 7, If perforating: �/,C:)'`'•-•••171# 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? tir Will planned perforations require a spacing exception? Yes ❑ No 0 PRUDHOE BAY UNIT 18-11B • r=�ti•%l. /7 RECEIVED 9. Property Designation(Lease Number): ,3;j�.t'"7 10. Field/Pools: ADL 0028321,, 4D4.,.•dG�1; "50- , /el L 6.,433C)Z- PRUDHOE BAY,PRUDHOE OIL- 11. PRESENT WELL CONDITION SUMMARY - MAY I U ZU1( Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): Junk M . 19493 • 8625• 19378 8641 2- 2 ,/rt.., AOGCC Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"91.5#H-40 48-128 48-128 1490 470 Surface 2461 13-3/8"72#L-80 46-2508 46-2508 4930 2670 Intermediate 2630 9-5/8"47#L-80 44-2674 44-2674 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment See Attachment 4-1/2"12.6#13Cr85 13Cr85 42-13017 Packers and SSSV Type: See Attachment Packers and SSSV MD(ft)and TVD(ft): See Attachment No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary 0 Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch 0 Exploratory ❑ Stratigraphic 0 Development 0 - Service 0 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: Oil 0 ` WINJ 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Thompson,Ryan be deviated from without prior written approval. Contact Email: RYAN.THOMPSON@bp.com Authorized Name: Thompson,Ryan Contact Phone: +1 907 564 4535 Authorized Title: Interventions Engineer _- Authorized Signature: S , Date: SIV41 1 7 COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 3 k?- ct< Plug Integrity 0 BOP Test Mechanical Integrity Test 0 Location Clearance ❑ Other: (30p -1c5 t` " 3 72 U p 0 ' "I Post Initial Injection MIT Req'd? Yes El No I / Spacing Exception Required? Yes CI No 12 Subsequent Form Required: l b --4-D i' n fit/_/ APPROVED BYTHE Approved by: Cietty�J `- COMMISSIONER COMMISSION Date: s-/7 /7 J-�',,— 5//7-1/'t4 t ' NAL RBDMS L-- MAY 1 9 2017fjfil Submit Form and Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED MAY 1 0 2017 RE: BP Exploration (Alaska), Inc. AOGCC Report of Sundry Well Operations Summary May 9, 2017 To Whom it May Concern: Attached please find the Sundry Application for setting a plug and adding perforations via a Well Work Platform for 18-11B, PTD # 213-195. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 bp • • Sundry Request for Extended Add Perf with Gas Shut off Well: 18-11B Date: 5/4/2017 API Number: 50-029-21181-02 PTD: 2131950 Engineers: Jamin Laplante: 907-564-4137 Chris Stone: 907-564-5518 MASP: 2420 psi Well Type: Producer Estimated Start date: June/July 2017 History: 18-11B was drilled and toed up into zone 2A for in-situ gas lift. A procedure was executed in September 2015 to blank off the in-situ gas at the toe of the well. This was designed to mimic a successful GSO on 18-21B. It successfully shut off 10 mmscf/d but since then the gas rates have risen. The blanking orifice was pulled and the gas rate did not change, thus a suspected failed orifice or packer. The GOR has continued to increase needing to be shut off to remain competitive. Scope of Work: The primary objective of this well intervention is to shut off the toe using a CIBP to ensure gas shut off and add 704 ft of perforations using service coil and the well work platform. Pre WWP work SL 1 Pull patch, pull nipple reducer, drift to deviation Proposed WWP Procedure: • MIRU WWP, BOPE and support equipment • MIRU CTU • Test BOPE with four preventers configured top down (annular, blind shears, 1.75" pipe/slips, mud cross and 2-3/8" x 3-1/2"VBR's, 1.75" pipe/slips). Test the blinds, VBR's, and pipe slip to 3500 psi and the annular to 2500 psi. • Drift and tie in run with GR/C L • Set CIBP at-18,700'MD • Perf-704ft • RDMO CTU and WWP Post WWP work SL 1 Reset and test nipple reducer FB 2 Assist SL, test nipple reducer EL 3 Reset bottom of patch SL 4 Reset top of patch with dummy valve installed. After passing pressure test, install dome valve as per attached WL request form. Pull 2-3/8" plug FB 5 Assist SL, test patch for integrity, MIT-IA to 2500 psi. S 0 Current Wellbore Configuration 114±= MI14-116" WELL}EAD= 1.4r.R/OY 1 8-11 B SAFETY NOTES: WELL ANGLE>70°fp 9018'. I ACTUATOR= BAKER C MAX DES:14.6"@ 14014. OKB.ELEV= 56' Ii .1 BF ELEV= , _ KOP- —2674 / I ----- 2014' A 714-in-Fe9 X NIP,ri=3 al 1-I ka Angle- 913" ,19174' 120"CONDUCTOR I _ tkaurn MD= NA 2524' j—9-FAX r BKRI-RD.F.7X PT4,IP si!WHACK Datum ND= 880Cf SS .,,,111-4-VE-l)_._ 11 lir 1,. 13-3nr C,..72# L-80 BTC13, -12.347" 1-1 2505 1 2640' --Iq-',Mr li F.'F 1 1141(IC 8 1 NU,r1/, 11-7 72- .,, ..../ , r 9 5e6"WI IPSTOCK(05/13/14) I-1 I i 2674' i---.... Mt,..c4.11 WirDoW 418.11E0 2674'-2691' 1 9-96"CSG1- .47a, 83 NSI-f,ID=5681' 1--1 1 -2674' 1'- GAS I FT 1/AN1Ffl s rs-i- k., IV() ECV TYPE VLV LATCH i PORT DATE 4-11r wrocii NI imui 5TRADOt F,PlOT 1207W- Ri3014'I b 13=1.91- :/ ' 2996 2994 12 51.14-1c UK UM&' ' 16 U9,13,15 4.09N2r15.0 I , 5 4638 4239 62 i, 1(8G-2 DAY BK 1 0 10710604 ., 4 6363 5089 59 j 1036-2 1'DAY BK 1 0 1,09/01,14 minimum au =1.0/D-p i-Juty iI 3 7673 5753 60 i K33G-2 , CMI' 13K 0 i OM&14 4-1/2"X 2-3/8" NIPPLE REDUCER ' , 2 8613 6204 65 . 101G.? I MY BK 0 0770614 1 9013 15357 70 I KBG-2 i OW SK j 0 10770614 ;rt,4 4-CNN 11A 5'EKTEMED PAICKFIG 1 f:1; i': -FATOP OF Cf34ENT(06;09114) 1-1 12885 1 I 4 6 RT OF STRA1I:4 F PKR : I 12885' 14-1/2-NES X tir,13=3 813" * 17,:4 pl 12395 "—7"X 4-1,2"TNT PK R,0=3&56° I I 12929' F- 'PT Ht,S x Na.,ID.,381j I .: .' g ' 13001' —14 1e7"FCS XN NI',In 1 725" [ .*: 13001' i 1.4 t+.,'x 11)11'Npial)I I arl-{00a1/1i5) :1- ..:;,.•: , ,I .3e. 13.014? 1 7 It r.•010-1, UPI TT ..mrn.A at TOP OF 1-1)2"LNi H 1301/1' 7....41 nn-r? \it SLEB/E.ID=4..34" . f 4_1,7 TB 3,12 60.13CR-85 VAM TOP HQ H 1301r --":.kin . ! . IP 13017' Ha-1r,"W FG.n li,117 091.1.)-3958" . " '* 1 .....4,-1 ...41 1--a ND Tr NOT LOGGED I 7"I hP,2f141,I-40 VA M TOPIC, — 13445 ,.1 Ile ' 13048 1-15'X 4-1/7 X0 1311,S)-ING.13=3.86- 03/i bpf,11.1.$,.flr 4 9_, 13038 1-17x5-0.(R Fl F41 00(1 PR 1-1-41.r)•, 1-;-1 PEFFORAT1ON SIJAAARY V hi el LOG REF :.,' .0 .1 13606' I-16 125"CFEN HOLE SIDETRACK 'Cr3 .0 sj ANGLE AT TCP FERF 92 @ 17280' !r1 hbts Refer to Procuction CO for hes toricalperf data 14466' TD 71101 HOLE.1 SIZE S1F . NTER'VAL OpruSqz SHOT SQZ PUP JT 1,291. ,,tti„... ... .. 15007& 16713* --4-F,VRJPJONTSw/RA TAG al ' RING 1'FROM FIN OF 4-1,7 5 ,13135 13140 S 0006114 06/07114 2 7/8" 6 1/280-17630 0 0f/04114 7-08' 5 171350-19180 0 0704014 STOP 7-m- 6 18230-18550 0 07.0014 2 718" 6 18E1:0 19003 0 07/04/14 --0e.' l. . 19195' ;-45KFIPKR w/7-NW x NIP 0 19706 11-1 675* I 6 193.13-19360 C 09,2214 ,` 11.. 011 (0b25,16) 1 2-7.11" G 19353-19378 C OS 18i 14 , ,- 147351—,45 KR RiR wo 11(7'ORIF13-, I 111 0!,'090 1/14'r P7,D —' 19378' N- 0 .a. ..,N4 4-1/r LNR.12.640,/SCR-86 vAN TOP, — 19491' "..---...: Airligg. . 4'. 0,52 bp1,ID=3 958- DATE REV BY CONLENTS DATE REV BY COMMENTS FRIXHIDE BAY MT 09/17414 MINN 41 IMT1AL COMPLETION 01/12,16 JL&AVID F411.X-LOCIVSET TYR"AMP(01/251'161 WELL 18-11B 11707109 NORDIC 1 C TO SIM-TRACK(11-11A) Oi2 .1.1:1Cirf..11.14 ADPEFFS ACCED FRCAI OW014 FERMI M,- 2131950 ' ' 07/06414 P-272 SIDETRAC K(1 al 161 07114i/11 .11.i.t14 1 CORRECTION TO PEPfS AR 6in 50 029 21181 02 10.4)#n' JLSJ1.43 SET LIAR STRA CUE PAR 09109/15) st-C 19.11119,Ft15/-,1201 FPI &431'F-L1.1 10818/18 JLSJMD SET STREl PKR(9/12)1PLEL PLUG(9r 13) 10,044-1 J1414.4.0 GLV 0,0(09/1115) I BP Eft plor anon(Alas k a) .11.. • 0 • Planned Wellbore Configuration Ha 4 CAV H 4 1/16' WO I If Al) WI V OY 18-11B Proposed 1 SAFETY NOTES:WELL ANGLE>70'@ 9038'. ACTLIA TOR= BAKER C ' MAX 01_5-14 6"04,14064', OKB ELEV= 55 ,II I BF ELEV= ? ,. KOP= 2674 —__......Z. , 2014' I"( V,'(4S X NIP.ID--1 1)/v I Max Angle= 98"©19174'120.cot..mc loi.e Datum AU= MA 2524' , -'>,,..e'x:-FiK,7 11.4.)t£XI"I't L 1F'vi iTIBBAO< , Ilitim TVD= 8800'SS' '.1 I 1., f.'ffe I. 11 __. 2540' i • , 0 . f !i 1 51.r,,,,,.I Ni,,'44 [13-3.4r CSG,724,L 8010C,I":=1.1 'A i--1 2500' [73-5/8"k/VHk1-01.....K 10511,141 I i 2674' . MIL LOU I WINDLAN(18-11131 2814'-2991' 1,0 518"C".-;G,47#,I 60 NSCle.: ID=9 691' I-, -2674' GAS LFT MANDRELS ST I1/440 NI) GEV TY PE VLV LATCH PORT OA ft- 4 I 1"W1 0 131M DKR S IPAOOLL FKR. I ' [2978'-3014* a 1:11 al ^g 2996 2994 12 SMR-IC CONE BK 16 0911 5 ID-1 01'09112'151 ir 5 4638 4239 62 KBG.2 DIMY Elk 0 0710514 4 6363 5089 59 KBG-2 'WY BK 0 09101 14, 141 in trn u M 11) =1.8/0-.g 1.1001' I i 3 7673 5753 60 KBG-2 DMY BK 0 07109,14' 4-1.'2" X2-318" NIPPLE REDUCER 1 2 13613 6204 65 KBG-2 DIN BK 0 &7,'06.14j 1 9013 6357 70 KBG-2 CAW BK 0 07/0&14 5 t A 4 4-()MY FAS DffENCED PAOONG '3 DIt#6 ''PART OF STRACOL E PKR 4.11 N I 1 Ilt..(V-i:11 i ---1 12665' 1 P gi 1 1 2 86 5' .1--14-1/2"Hes x NI',ID,,3813' j I 0 KM tp 17895' 1-7"X 4-1/2"1NT FKR D=3.8569 MICR 1 2 92 9. -----"-;17:irrifF5'NP X","--","i-".•1 1 300 1' -4 17'11EN:XN NI- I --...-", 1 300 1' , 14 1.'2"X 2 318'N t 114f.D.ID=1 875"(094)7/151 I 13014' -7 *1,,'DKR 1 13b-E 2XF LIP w1TIEBACK TOP OF 4-112^LNR H 1 3014' 1 I SLEEVE 13=4.34' TliG,1281.13CR.85 VAM TOP HC 1 13017' --- rsi to , 10,2 bot o=3.958. ti 4.2.19 ----..„,1 13017 H41/2"WLEG,El=3 883' —"A , [ 1--[amo TT NOT LOGGED 7'1NR,281,1 80 VA M TOP HG, -f3446. \ %Ile N, 13048' H.Er x 4-1/2'XO BUSHING,0=3.86" 03/7 PO,11).6.278' , ii : 14. N1 13038' -rx 9"timt4f1EX1OCKINRK.44.it.,4 3t--1 PERFORATION SLAWARY f1: • 1 - ..,,V 1.1 13605' H6.125"OPEN HOL L StkIRALX, RIEF LOG- '17c ANGLE AT TOP PERE 92''71 17280' .toil V' 1......... 14466' IH TO PLOT HCI_I-I Nte.Refer to Production DB for nislorical pert data rat,,ie 1s0 SIZE SPF' INTERVAL Opn1Sqz SI-CT SW N IA ..t.le Mil&- V "'Ph, 4-lir .5 '13135 13140 5. 06dmi4 06/0/.14 15002'&18713' 4 117PUPJOINTS.4.1RA TAG IN 2-7/8- 6 .;.16350-17054 v't • fl,,,,e 2-7/8" 6 117280-17630 0 07/04.14 h..0 NI---" .-- STOP RFC 1'FROM PIN OF RP JI "V' :7;, ' to. 27/6" 6 17850-18180 0 07/04/14 "---18,700MD CIBP . 2-7er 6 -18230-18550 0 0704,14 Ae 19196 -45KB PKR vo12-3/8"XM"@ 19206',ID 4 1 875' 2-7..B" 6 18850 19000 C 07/04/14 Pt 5719) 2-718, 6 19330-19360 C 09122:14 s 1,171,4' 11? 9j -1 -iis lin['Wiren"r-1nafr.F 2278" 6 ;19358-19378 C 1)918114 lI. .§ W• in- 05 409123/14) Fele - 19378R 1,1.14 IMIM !4,4' .9.•.44;e1 e 4. 4-112'LNR.12.64,13CR416 VA M TOP, - 19491' 0162 big,ID=3 950" - BATE- REV BY COMMENTS DATE REV BY COA4VENTS PRUDHOE BAY UNIT .09/1 7,14 RWN 41 INITIAL COMPLETION 04/12/16 JLS:115 4PILL X-L OCK:SET PKR MNP(01(25(16) WELL 18-11B 11107119.NORDIC1 CID SIDETRACK(18-11A) 0542505 C81),I) ADPERFS ADDED FROM 36436;14 PERMIT No. 2131950 '07/08/14 P-272 =ET RAC K(18-11B) 02116117 JUA113 CORRECTION TO PEWS . . ARl(:50-029-21181-02 10438''5 ALS/i14)SET LY/FI S FRA DOLE PKR(09(091151 SEC 19,T1 IN.R15E,1278 FNL 8 431'FIM 104318'5 ..11..S/J1411)SET S 1 Kt 110i(902#1-1A1 PLUG19113) 113108:'5,J4.6404)ay G.009/13/15) II I BP Exploration(Alaska)k a) • • BOP rig up-with utilization of safety joint/TIW stabbing valve during open hole deployment "" Platform Floor Riser to platform floor ' * ' Annular Nie Blind/Shear Hydraulically Actuated Valve �� 4'4 ■E I iIM JI Coil Pipe/Slip iii[t�t�,,.SI Com° ' iI ( )Choke Line ��' �p �Ir �" II_ '� �,i� Kill Line Ior m �iIq� Variable Bore Ram 1.I • Till if il CoilPipe/Slip 7 x 7 Spool as needed J L Flow Cross 1.• 1r p� SSV im et,j Master Valve d ■ 1 �. THA 1.1 • ■IIIL!A"II �r Tubing Head Ground Level • • a) p o o p o — CfltivLOLn N V LO CO CO U 0 0 0 0 0 0 i d) M N- - N N 3 V 0) CO N O O M '- "Cr CO N- O) O) O CO t N O N O N- O N LO in CO N CO 00 N N 00 CO f� 1 1 1 1 1 1 F- O CO CO CO V N N N O ++ f1A O �t I's N E O ~ V O Lo N N (. r a- Ci Z ,r3-1 co co V N N I- W Lf)co co lO ` O o °? 00 T , co U T = J J CO () 0 d *k N J *k (04:k V - O N N Lr- rn a N M 0!) r r r p N L co V (r) CAO N N V- CO C- 0) - C U W LLJ U 0 LL c f z O D H Z Z m U w Z J J • • a, 0 m CO C) N CO N- CO C3) IC) L O CO O Ln r N- Q r CO CO CO r) O O 00 C) O OD V V Nr ❑ CO 0 t` CO CO 0 CO 0 CO CO 00 00 CO CO 0D I- 0. 0 I- Ln N- CO LO N- CO O) t CD I"- N V r m 0 co 4 O(Nir r • r) M 0 O CO O O CO CCO O CO CO00 I- W CC 0 O 0 W Z W W 0 W0 O gg JY 0 W U O CO m O O < Y Y H g J U U r « OO CO 00 C) Lf) CO co J J J ¢ ¢¢ w Cn W i .41 " CO r to O CO CO r) ¢ ¢ a a 0 ?- 0 Z DCI8N- co 00 CA A CA O) 00UJ W w J AWMrr rrrrr _ Z _ 0 dOd0 0¢ ¢ ¢ 22 t12 00wm m Z O Z a V Z2 0 ca co m cn m QM a I- C < -c 00000000 O m a N COCOCOcoLnr) cncoLoco _ a) COo0 CO ❑ t` N- CO CO CD O CD }' Wy = = = = = r ill 0 = 2 Cr cJ 2 E- O a J a M A. Q 2 2 2 O cn cn u) co cn MI a3 c 2 � � � � 0_ 0_ 0_ ISdaaaa. aa d Q Q Q Q m m m a 0 t m a a) H 0 V' �t Nt 0 0 (O 0 0 C 0 0 0 0 0 0 0 Lu W J Z O N N (V N N N N Z 1 ¢ W V v• O W 11 0 W N L� 2 Nr V V N N N 0 a 7 W 0 W CC U a N- N- N- Z 0 J W W II_ W 0 m 0 1 D w J J J D0 LU w < ¢ ria CI) u m � a a) E Z C0c0000000cDcn N , , L 0 N CC w Do eo ao O O cX!, L a U a w m a a a U J 0 0 w a r r r r r r ¢ ¢ m m LL LL. u) u) a tY 0 0 Packers and SSV's Attachment PRUDHOE BAY UNIT 18-11B SW Name Type MD TVD Depscription 18-11B PACKER 2525.03 2525.01 7" Baker ZXP Top Packer 18-11B PACKER 2978 2975.96 4-1/2" KB Packer 18-11B PACKER 3008.14 3005.42 4-1/2" KB Packer 18-11B TBG PACKER 12895.7 7754.02 4-1/2" HES TNT Perm Packer 18-11B TBG PACKER 13026.21 7857.11 4-1/2" Baker ZXP Packer 18-11B PACKER 19194 8665.97 4-1/2" KB Packer 18-11B PACKER 19234 8660.48 4-1/2" KB Packer STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIC* 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Pull Blanking Orifice Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 213-195 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory ❑ AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21181-02-00 7. Property Designation(Lease Number): ADL 0028321 8. Well Name and Number: PBU 18-11B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 19493 feet Plugs measured feet FEB1 f1 C true vertical 8625 feet Junk measured feet EB6 2016 Effective Depth: measured 19378 feet Packer measured 12896 feet true vertical 8641 feet Packer true vertical 7754.02 feet AOGCC Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 47-127 47-127 1490 470 Surface 2461 13-3/8"72#L-80 46-2508 46-2508 4930 2670 Intermediate 2630 9-5/8"47#L-80 44-2674 44-2674 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 17280-17630 feet 17850-18180 feet 18230-18550 feet 18850-19000 feet 19358-19360 feet 19330-19358 19360-19378 feet True vertical depth: 8687-8681 feet 8685-8691 feet 8693-8703 feet 8692-8684 feet 8643-8643 feet 8647-8643 8643-8641 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr85 42-13017 42-7850 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED I:;"A x Treatment descriptions including volumes used and final pressure: ,n.r) 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 847 34183 0 1080 1065 Subsequent to operation: 965 33088 0 1080 1253 14.Attachments:(required per 20 AAC 25.070.25 071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service ❑ Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature iJCIit Phone +1 907 564 4424 Date 2/15/16 Form 10-404 Revised 5/2015 (/rL Z I tel j{{i RBDMS `' FEB 1 8 2016 Submit Original Only • • Q p O O o O O (Cicr 15 - — .� o r. v (o (o O N Lf) CO CO U TA 0 0 0 0 0 0 i 0) CO N V' N N 3 V' 0) CO N O O CO ' (O r-- r, r, c0 V• N N O O N (o (O N (O CO N N CO CO N 13 I H LO co r� O V' N V N V d• co co 'Cr N N- C 03 V• V V V O N M O r � V 03 M 0 LLI Q r f� Co V• N 0.) 'CrV V CO N OM V rn10 \ a O O c0 (0 CS) •Ri- -I CZ)p M CO = d *k N .y N 10 N 4 (O O (3 N N (Ni V - jo N - - N � d) 1"--- 4 v w p N O (O MN f� c co O J N N '- (0 = w CO O w •NUUw zrXwwwm O D H z_ z_ D U (n Z J J I--• • • Packers and SSV's Attachment PBU 18-11B SW Name Type MD TVD Depscription 18-11B PACKER 2525.03 2525.01 7" Baker ZXP Top Packer 18-11B TBG PACKER 12895.7 7754.02 4-1/2" HES TNT Perm Packer 18-11B PACKER 13026.21 7857.11 4-1/2" Baker ZXP Packer 18-11B PACKER 19194 8665.97 4-1/2" KB Packer 0 = a 2 = � / ? N » 1 e % / q ® -ID ) 0 (Do < Gt ? 7 32cn af 227 \ 0 ko/ \ � ? k0- 5 a N $ & 73 7 R •E ,E / ƒ 2k \ 2 2 /2 as ET) 4_ E en g q EI �3 22fe / c\ @ IP I e a E 1- \ / ƒ % 2 , \ \ c e * Rcci / 0/ $ f ® OCa2IOg » co » CL 0 � ct � / / \ J_ ƒ . R , 7 O E / «/ > k o M H / / $ H c 2 a) t CO2 © \ E o \ o \ / \ D I (13-0., /Ce k / t / O / 0• _ • '- 0 H c C _ H a ^ f O O %/ = 0 ? \ 2 }_ a y r ° ° - » / ) / \ § / a _z o e 5 N- \ k E // q % § v- t o asI & \ x 3 E \ Rƒ ./ / / \ 7 CO emco = fai = o a / @ $ 9 2 / - £ q * / o 2 _ ± ! U 2 3 E _ ! e L \ co e � ,-- d / � 5 \ \ Co Q 2 ,- 0 0 « JILL= UN H 4-1/16" • : •D= McEVOY 1 8-1 1 B sib NOTES: WELL ANGLE>70°@ 9038'*** ACTUATOR= BAKER C MAX DLS:14.6°@ 14064 . OKB.B_EV= 56' Ii I BF.E3_EV= ? KOP= 2674 Max Angle= 98'@ 19174' 20'CONDUCTOR 1 J 2014' -I 4-1/2"HES X NP,ID=3_813" Datum MD= NIA 2524' -9-5/8'X 7"BKR HRD-E ZXPN LW w/IIEBACK Datum TVD= 8800'SS SLEEVE,ID=6.19' 113-3/8'CSG,72#,L-80 BTC,13=12.31-1 2500' i2540' -19-5/8'X 7"FLEXLOCK LI‘R HGR,0=6.22' 9-5/6"W-4-'STOCK(05/13(14) 2674' PA_LOUT VVINDOW(18-11B)2674'-2691' 9-5/8"CSG,47#,L-80 NSCC,ID=8.681' -2674' . GAS UFT MANDRELS 4-1/2"WFD GLM BKR STRADDLE R(R, -1 2978'-3014' ST 144) TVD [EV TYPE VLV LATCH FORT DATE 0=1,91'(09/12/15) *6 2996 2994 12 SIM-1C DOME BK 16 09/13/15 .11 L 5 4638 4239 62 KBG-2 DMY BK 0 07/06/14 4 6363 5089 59 KBG-2 P BK 0 09/01/14 Minimum ID = 1.875" @ 13001 3 7673 5753 60 KBG-2 DMY BK 0 07/06/14 4-1/2" X 2-3/8" NIPPLE REDUCER 2 8613 6204 65 KBG-2 DMY BK 0 07/06/14 1 9013 6357 70 KBG-2 DMY BK 0 07/06/14 STA 4 1 - .. HAS EXT} . PAC .; f - • ' TOP OF CEMENT(06/09/14) -1 12665' , STA# 3 Balm)s F • i?1 12865' -4-1/2'HES X NP,0=3,813" . I 12895' f-7'X 4-1/2"TNT RCR ID=3.856' 12929' -4-1/2"HES X NIP.ID=3,813" ,1 I (.$:34 i 13001' -4-1/2"I IM XN NP,ID=3.725" I 1 A . ' 13001' -4-1/2"X 2-3/8"NP RED,ID=1.875"(09/07/15) 1 i . 13014' j-7'X 5'BKR I-RD-E ZXP LTP w TTCK , I33A TOP OF 4-1/2"LNR -1 13014' 4'11 •I / ( p SLEEVEID, =4.34' 1' 4-1/2'TBG, 12.6#, 13CR-85 VA M TOP HC, --I 13017' / r -Vv. .0152 bpi,0=3.958' )V 414 I t`or 13017' -14-1/2"WLEG,ID=3,883" _ * ,,i ! —.EIMD TT NOT LOGGED ' F.+ 7'LNR,26#,L-80 VAM TOP HC, - 13446' 1 A . •,-4' 13048' -15"X 4-1/2'XO BUSHING,1)=3.86' %. .0377 bpf,ID=6.276' •e 1• 4 • 1 • 13038' -7 X 5'BKR FLEXLOCK LINPHGR,ID=4.31' PERFORATION SUR/SAA RY 1 13605' -6.125'OPEN HOLE SIDETRACK 4 - . N: LOG. le ' ANGLE AT TOP FERF:92"@ 17280' Ig 1 1 bbte:Refer to Production DB for historical pert data 4 7' 14466' -TD RIOT HOLE SIZE SPF NTER'VAL Opn/Sqz SHOT SQZ 2-7/8' 6 17280-17630 0 07/04/14 4 •.1111611b.., 2-7/8" 6 17850- 18180 0 07/04/14 4 15002' &16713' -4-1/2"RP JONI'S w/RA TAG IJ 2-718' 6 18230- 18550 0 07/04/14 'r I--_J STOP RNG 1'FROM RN OF RiP JT 4 2-7/8' 6 18850- 19000 0 07/04/14 I I I—I 2-7/8' 6 19330- 19360 C 09/22/14 V I- J I 19195' -45KB FKR w/BLANK ORFICE,0=0"(09/04/15) 2-7/8' 6 19358-19378 C 09/18/14 vim .5 19234' - 19239' -45 KB FKR w/1/2"ORIFICE, NM ID=.05'(09/23/14) lid 11. PBTD — 19378' I • _ le• le"' 1j444#% ' 4-1/2"LM, 12.6#,13CR-85 VAM TOP, - 19491' --..... " 'I .0152 bpi,ID=3.958' Cla.TE REV BY COMANTS DATE REV BY COMMENTS FRLDHOE BAY UNT 09/17184 FMN 41 INITIAL COMPLETION 10/08/15 JralkID SET FKR w/BLANC OFFICE(9/4/15) WELL: 18-118 11/07/09 NORDIC1 CTD SIDETRACK(18-11A) 10/08/15.DUI/JM)SET PIP RErixx PLUG(09/07/15) PERMIT No: 2131950 07/08/14 P-272 SIDETRACK(18-11B) 10/08/15 JLS/JMD SET LWR STRADDLE F(R(09/09/15) AR No: 50-029-21181-02 02/11/15 PJC STRDL PATO-IASSY EDIT 10/08/15 JLS/JIA)SET STROL FKR(9/12)/PULL PLUG(9/13) SEC 19,T11N, R15E, 1278'FIL&431'FWL 09/01/15 BF/JPA) FELLED STRADDLE RTO-1 10/08/15 JMACkt)GLV C/0(09/13/15) 09/01/15 BF/JM) GLV CIO(08/26/15) BP Exploration(Alaska) STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COM N REPORT OF SUNDRY WELL OPERAS 1. Operations Performed Abandon 0 Plug Perforations Q Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other . - Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 213-195 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-21181-02-00 7. Property Designation(Lease Number): ADL 0028321 8. Well Name and Number: PBU 18-11B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: ld - Total Depth: measured 19493 feet Plugs measured 19194 feet p I V true vertical 8625 feet Junk measured feet Effective Depth: measured 19194 feet Packer measured See Attachment feet OCTI °°' 2015 true vertical 8666 feet Packer true vertical See Attachment feet AOGC ; Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 47-127 47-127 1490 470 Surface 2461 13-3/8"72#L-80 46-2508 46-2508 4930 2670 Intermediate 2630 9-5/8"47#L-80 44-2674 44-2674 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 17280-17630 feet 17850-18180 feet 18230-18550 feet 18850-19000 feet 19330-19358 feet 19358-19360 19360-19378 feet True vertical depth: 8687-8681 feet 8685-8691 feet 8693-8703 feet 8692-8684 feet 8647-8643 feet 8643-8643 8643-8641 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 42-13017 42-7850 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): ry�}i Treatment descriptions including volumes used and final pressure: SCANEV DEC 1 62015 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 1655 33121 20 430 545 Subsequent to operation: 1345 21512 42 1200 523 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development Q Service 0 Stratigraphic D Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ ❑ WAG D GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature la/LiCOL- Phone +1 907 564 4424 Date 10/12/15 Form 10-404 Revised 5/2015 v 1/77.-- 0/),///S_ 3c- RBDMS OCT 1 2015 Submit Original Only • • Packers and SSV's Attachment i PBU 18-11B SW Name Type MD TVD Depscription 18-11B PACKER 2525.03 2525.01 7" Baker ZXP Top Packer 18-11B TBG PACKER 12895.7 7754.02 4-1/2" HES TNT Perm Packer 18-11B PACKER 13026.21 7857.11 4-1/2" Baker ZXP Packer 18-11B PACKER 19195 8665.84 45 KB Packer w/Blanking Orifice 18-11B PACKER 19234 8660.48 45 KB Packer w/1/2" Orifice • • c.000000 p N V 10 CO CO U Act00000 i O) co ti N N 0) CO N O CD CO V CO N- d) 0) CO N7' N LO NOr- ON (n LC) (O N (O CO NN000ON- O I 1 1 1 1 1 1.0C0 I CO d N d N 'Cr (o CO N r— O .4- N r N in co d- O N N M M r r r C.) *CE Lo r I,- co v N N d' Lc)N M tt = CO � m ALO o coo aom 03 J M 1 � � N * N *k J *k *k C0 N N V rnW N N (NMC) � v v CDP OD OM N N- N- C CO CO O7O7 J N N O (OCK W C O W W To" U Z W W W pp O D ' Z Z D U (nZJJ ~ • 0 a) Q u) o a)+- . a) L m L L O C 0 H '= a O O Cl) w v) 3 c a 3 n I— C� vo CD colaD 3 O 4) YN w c c Q- a) a) c) � 3H �as 0 a) N a 3 (II o Y V L 1:5o a E Q o U Er 06 N O N Q) (n YQ � a L o'P � v a -30 3 0 to' N ( o N N CO c O L co CG U) a) L acL O _0 -a cII 4- cn pO in 'ct c a) O N 4- - O a) c •cYL ac pd �� E 7 a) N O N ( 3 a) , a. L c , L c a L a. co O> O v� L O `i (C) J c6 m m 3 al o ) 0) LD o NY ~ U � m o V a) = II E in Lw c = c 0)U -a O as D m ,0 a. Y y � � � .- c La U..1 a- = NL U) 0- > a) -a c o ao I- O >- m e a) m e a) a) c j Q m ca ;7 ix Y a= o O ai c a) _a O c Y _, E O c �2S L L < a) ° .S D a m z s O co o Q vi .3 n 0_ a Q E oam N w '3 rn N o a a L L C O L O -a to (n O pp w U D c aj O c Y a OO L am— LL 373 � T' a s7 O 3 0 U (II o (u v L 3 a) a) IL 00 O O L 3 fl- 11 cp to 4- 0 p0 cow cm N a) U O -I c > O U CD- 44- (1) LLO 0 Y co CU a >+ N U) a) r+ .0 :— _c "L o N C cII m O - L c L m 3 - o N Y O .- O 0 a Q 3 cn O COO * c. O O rn a) O 3 �' a c w- c 1 o Q- 3 a _E — m a)o >�(134-= > p N- 0 _ I1 i a OU = ILII L - U a) c .� a) a 0 Y 3Lo_ c O > U J ,� o f a) p c) Urn _o I- 0 a) L) a 0) Cl- o)a ' a a 1— r- U � i O E 3 - Q t O co a)-0 U s2 x N § . !O 3 cII m a .� = Y o ca m e �' rn L u) L L • W J 1- a 4* E. U o o aa) f° < Q o a� a) U v� O _m N Q- -a Y O I— ° o L cII LO �- a) ` cn x a a. a) I— O E i a) \ C) U 2 � .(° '-C-1 cm 3 O w O .() U) u 3 U f— o0 O Z - In W I- pn lo (C) T H O O CD n C) co v N N L N M CD CD rn rn and � � 0 Q TREE= CM/H 4-1/16" ACTLI4VMELIJF OR= BAKER C • 1 8-1 I B ! SIPDLS'O 4E6°• WELL 14064NGLE>70° 9038'r" '1OKB ELEV= 56' ' -- BF ELEV= 11 1 KOP= 2674 --14 2014' 112'HES X NE, =3.813" Max Angle= 98°@ 19174' 120-CONDUCTOR ? ' !Datum tut?= NA — 2524' 1--9-5/8'X 7"BKR t 2D-E ZXPN LTP w/TIEBACK I Chun TVD= 880(7 SS SLEEVE,D=6 19" 13-3/8"CSG,72#,L-80 BTC,i)=12-347' 1-1 2500 i /1 2540' _—I9-5/8"X 7"FLEXLOCK LM HGR,D=6.22" 19-5/8'VVHPSTOCK(05/13/14) — 2674' i Z� _ • MLLOUT WWDOW{18-118)2674'-2691' 9-518"CSG,41*#,L-80 NSCC,D=8681" — GAS LET MANDREL-S 4-1/2"AFD GLM BKR STRADDLE PKR H2978'-3014' STk M3 IVO j DEV TYPE VLV LATCH PORT DATE D=1 91'(09/12/15) "61 2996 2994 12 SMR-1C DOSE BK 16 09/13/15 K 5 = 4638 4239 62 KBG-2 DAY BK 0 07/06/14 Minimum ID = 1.875"@ 13001 L 4 i 6363 5089 59 KBG-2 "MY BK 0 09/01/14 3 7673 5753 60 KBG-2 OW BK 0 07106/14 4-1/2" X 2-3/8" NIPPLE REDUCER 2 8613 .6204 65 KBG-2 OMY BK 0 07/06/14 1 9013 6357 70 KBG-2 OMY BK 0 07/06/14 STA#4=OMY HAS EXTENDED PACKNG TOP OF CBM6YF(06/49/14) -� 12665• 4 STA#6=BE3-1tiND STRADDLE PKR t { 12865' -�4-1/2 fesD HES X , =3.813" •+ -* y --17'12896' X4-1/2'TNT PKR,D=3.856' , ` 12929" --I4-1/2"HES X NP,D=3.813" a ' - .. 6 , 13001' - 4 1/2"FES XN Pte,D=3.725' .S. w 13001* H4-1/2'X 2-3/8"P RID,D=1.875"(09/07/15) ! 4 • 13014' i--7'X 5"BKR FRD-E ZXP LIP w TIEBACK TOP OF 4-1/2"LNR H 18014• ' : / , � ='. = SLEEVE,E Q=4.34" 4-1/2"TBG, 12.6#,13CR-85 VAM TOP HC, —I 13017. -s .� F�� . .0152 bpf,CI=3.958' * '! 1301 T —14-1/2-1NLEG,D=3.883" ~ r € --lam)TT NOT LOGGED 7"LHR,26#,L-80 VAM TOP HC, f--1 13446' :"r t' 0377 bpf,D=6.276" _ ► -,` 1304$' H5"X 4-1/2"XO BUSFNG,I)=3.86" 13038' --17'X 5'BKR FLIXLOCK LNR HGR,D=4.31" PERFORATION StASAARY ",* 011. w 13606' —6.125"OPEN HOLE SIDETRACK Rff LOG: -y"c,,� ANGLE AT TOP PERF:92' 1- 1728(7 , Note:Kiefer to Reduction DB for historical pert data ; 4. ,.. f----f--44-i6'-1--i-TD •1—iTD PILOT HOLE SIZE SPF INTERVAL. Opn/Sqz SHOT SQZ w"� 2-7/8" 6 17280-17630 0 07/04/14 X'''. 2-7/8" 6 17850-18180 0 07/04/14 * ' 15002'& 16713' —4-1/2"RJP JOINTS w/RA TAG IN 2-7/8" 6 18230- 18550 0 07/04/14 I_ I STOP RIG 1'FROM RN OF PUP sr 2-7/8" 6 18850-19000 0 07/04/14 w� 2-7/8" 6 19330- 19360 C 09/22/14 .:r I- ! +` I J 19195' H 45KB PKR w BLANK ORFEE,D=0"(09/04/15) 2-7/8" 6 19358-19378 C 09/18114 • 44 19234'-19239'I—45 KB RCR w/lir ORIFICE, I 0- Q=.05"(09/23/14) • I I I- F TD 1-f 19378• 1 .`..... .,-,4-*".,--. +..,.« ..v.- tar . w.+♦ 4-1/2"LHR, 12.6#,13CR-85 VAM TOP. —{ 19491' --______4-7.4*!-..--,*,,. 0152 bpf,Q=1958' DATE REV BY COMMENTS DATE I REV BY COMMENTS PRUDHOE BAY UNIT 09/17/84 RMIFN 41 INITIAL COMPLETION 10/08/1517 JTC/JM)SET FCR w BLANK ORFIC E(9/4/15) WELL. 18-11 B 11/07/09 NORfIC1 CTD SIDETRACK(18-11A) 10/08/15(DLFYJM)SET NP REI YXX PLUG(09/07/15) PERMIT No: 2131950 07/08/14 P-272 SIDETRACK(18-11B) 10/08/15 Ji..S/JM)SET LWR STRADDLE PKR(09/09/15) AR Na: 50-029-21181-02 02/11/15 PJC STRDL PATCH ASSY BIT 10/08/15 JLS/JM)SET STRDL ACR(9112)/PULL PLUG(9/13) SEC 19,T11N,R15E, 1278'FM..&431'FAL 09/01/15 BF/JIM PULLS)STRADDLE PATCH 10/08/15 JMWJM7 GLV GO(09/13/15) 09/01/15 BF/JID GLV Ct0(08126/15) ! _I BP Exploration(Alaska) 1 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Sunday, September 13, 2015 4:47 PM To: AK, OPS FS1 OSM;AK, OPS FS1 Field OTL; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL;AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS PCC EOC TL;AK, OPS EOC Specialists;AK, OPS Prod Controllers; AK, OPS FS1 DS18 Operator; Morrison, Spencer; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Regg, James B (DOA); Pettus, Whitney Subject: OPERABLE: Producer 18-11B (PTD #2131950) MIT-IA Passed Post Patch Set All, Producer 18-11B (PTD#2131950) passed a MIT-IA to 2500 psi on September 13, 2015 after a tubing patch was set to repair tubing by inner annulus communication. This passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. Please use caution when bringing the well online as the annuli are fluid packed. Please call with any questions or concerns. Thank you, Whitney Pettus (Alternate:Kevin Parks) `BBPPP Alaska-Well Integrity Coordinator div 7rya WIC Office: 907.659.5102 WIC Email: AKDCWeIllntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Saturday, August 29, 2015 9:35 AM To: AK, OPS FS1 OSM; AK, OPS FS1 Field OTL; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr;AK RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL; AK, OPS EOC Specialists; AK, OPS Prod Controllers; AK, OPS FS1-DS18 erator; Morrison, Spencer; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; ARI-D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Regg, James B (DOA) (jim.regg@alaska.gov) Subject: NOT OPERABLE: Producer 18-11B (PTD #213195 er annulus pressure above MOASP All, Producer 18-11B (PTD#2131950)was reported to have sustained inner annulus pressu ove MOASP on August 28, 2015.The pressures were reported to be tubing/inner annulus/outer annulus of 2350/2020/1 . straddle patch was 1 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Saturday, August 29, 2015 9:35 AM To: AK, OPS FS1 OSM; AK, OPS FS1 Field OTL; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC IL; AK, OPS EOC Specialists; AK, OPS Prod Controllers; AK, OPS FS1 DS18 Operator; Morrison, Spencer; Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Regg, James B (DOA) Subject: NOT OPERABLE: Producer 18-11B (PTD #2131950) Inner annulus pressure above MOASP All, Producer 18-11B (PTD#2131950) was reported to have sustained inner annulus pressure above MOASP on August 28, 2015.The pressures were reported to be tubing/inner annulus/outer annulus of 2350/2020/10. A straddle patch was removed on August 26, 2015 for upcoming wellwork.The well will remain Not Operable until downhole integrity is restored. Please call if you have any questions or concerns. Thank you, Kevin Parks (Alternate Whitney Pett w CR GBP Alaska-Well Integrity Coordinator SCANNED SEP 0 3 2015 Global Wells Organization Office: 907.659.5102 WIC Email:AKDCWeIlIntegrityCoordinator@bp.com Fro�i irAK--DEK Well Integrity Coordinator Sent: Thursday, Al:rgust 27, 2015 10:14 AM To: AK, OPS FS1 OSM; AK, OPS`F field OTL; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, D&C Well Services Operations Superintendent; AK, A 'reline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East e !•t Engr; AK, OPS PCC EOC TL; AK, OPS EOC Specialists; AK, OPS Prod Controllers; AK, OPS FS1 DS18 Operator; Morrison, •= -r Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coors l • AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R Subject: NOT OPERABLE: Producer 18-11B (PTD #2131950) Patch Pulled for upcoming Wetlotolik All, 1 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Thursday, August 27, 2015 10:50 AM To: Wallace, Chris D (DOA); Regg, James B (DOA) Cc: AK, D&C Well Integrity Coordinator Subject: FW: NOT OPERABLE: Producer 18-11B (PTD #2131950) Patch Pulled for upcoming Wellwork Jim/Chris When I sent this out earlier, I realized that I did not copy you with the notification. A straddle patch was pulled for upcoming well work.The inner annulus will break MOASP. Coil is scheduled to go there on Sept 2nd to continue the well work. Please call if you have any questions or concerns. Thank you, Kevin Parks (Alternate Whitney Pettus SCANNED SEP 0 3 2Q15 BP Alaska-Well Integrity Coordinator V G' 'V Global Wells Organizatior Office: 907.659.5102 WIC Email:AKDCWeIIIntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Thursday, August 27, 2015 10:14 AM To: AK, OPS FS1 OSM; AK, OPS FS1 Field OTL; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL; AK, OPS EOC Specialists; AK, OPS Prod Controllers; AK, OPS FS1 DS18 Operator; Morrison, Spencer Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R Subject: NOT OPERABLE: Producer 18-11B (PTD #2131950) Patch Pulled for upcoming Wellwork All, Producer 18-11B (PTD#2131950) had a straddle patch removed that was covering the gas mandrel @2996' for upcoming wellwork. With the patch removed the well now has tubing x inner annulus communication .The well has been reclassified as Not Operable until downhole integrity can be restored. Please call if you have any questions or concerns. Thank you, Kevin Pa (Alternate: White ttus) 1 o 1 "' O ••N p N CO CV O CO C C (V O i O (V I k • 0 CO Z C CC+) CO i , •CV N CO Z (N O ra 7 W (O 415 co To co co N 0 OI 2 a0 N OD O OD CI W 00 0.) tO O 0 N m " q } m a12 a1Z �Ic aJ z CL ao > N 0 mal CO dl m dl mal - al al al CI 6 I- 6 0 ) hi 5 his hi u� ui� 2-0 co co u) c Z c Z E2 E2 E2 E2 Id 2 2 2 2 D mcoIL co co cOIL 03_j IL I_ IL IL >_ F. N U) N In co N 0)U) ,- Q co U) U) U) Q a an D D D it cZ �D o) c6D o ) CO o v' Tr' v' v' KIWI �,v' �lv' �Iv' �lvl W m'- m' am,- 1.5 T- 0_ NI- 0_ ‘7 o a 0 a o a 0 0 J CU 0 N CON CON U)N U)N COp (Y)N'O CON'O CDR-it CON'O I z O C co j CU BZ CO 2z 4)0' N D-i N D-I -0z .- N D J 0 d 0 -, 0 -, 0-, 0-, it c LL- iLL -) N- LL�°o LL �°o x O E v�1 Lon, 1m NIN �Im Or�0 to,03 to,,,%- �I 2co �I 03 ° q c N E 'c� cam - 'c .-- 'cam- co c c � I c� c � I W cC N co I 0) O o0 00O 0O o0� 0 1 00 o0 R o0 a o0 7 L� 0 V I I� I� H I I Q rN Om 0m 0mCO 0mM 0U) 0m O 0m O 0m O 0m O M W 1.� c W W 2' W <L' W.- W D W O W O W O W U N 2 N 0 0 U V a .4- ,- 7 .4- ,- CL a - > 0 5 5 5 0 5 5 0 WaQ CO •3 N CV N N N N N N N _I o d f07 f07 CO) CO00 0 (� M M IfiY -I H CO IX CO CO (0 (0 c0 CO CO (0 CD a X V W 2 Z 0.. O. o O C.)' Z 8 I _ _ Q 0 I a 0 °o 0 16 to O fh N 0 m 7 10 H Ch 0 n J c o o m CL in 0 Z1 W C 0 r N 000 CNV N C o G O a� rn N CO N rn u0� pN r E '' a w aN U N 0 1 E 1 co Zo CO CO 7 O J m WV G' Z O Q rTi I— _. or 10 0 z0 a)Tr v Enw° 2 N > m CO Q00 2 p V m f` E J co o w F f0 D I 0 CO Q WO.• C I W o or 1 Q z° ZI Q ti !T N E _1 1co U 0 c (U -o o z O Cl) CO M CO CO CO CO CO CO CO !bo m CO CO co co l0 CO co co CO 'O to N c E O 0 0 0 0 0 0 0 0 CO co CC Z TO m m m w m m m m I 2' 2' 2' 'En o) 'o) , o' rn 0 Z e _ ` 'O O O 0 0 0 0 0 0 _o u) > 0 -� 0 d r- r-- I` h- r- r- r- 0) .r N 'C 0 0 0 0 O 0 O O O O N a 0 E to to Co to 10 CO CA CO to CO C'7 1 Q Z .0 C 0 (U 7 V V M' R V V V V V V N CC O O O W 0 z N N N N N N N N N N O Q 0 E r.. LLIii 77 co z0 �_ Z W o G2 0 0 0 0 0 0 0 0 0 0 v E = Q ' J 0 O m 0 .- o. m 0)+° o. 0 0 0 0 0 0 0 0 0 o Q a rt 0 I- 3 3 W w w w w w W w W (i o 9 co — + o N V Ci. N p Vlco 0 N N 7 C cmu) co. N - C 1 CO O 7 • O 7 O ° 7 T. Z • U c U U c U 6I O U c N I C O 1 c O I a m C O . C N U a0 U O UI ' O 0 cm 0 UI o (n .- 0 .- UI ,. I o d1 a) dl . al u) 0.)1 �I ,- �I 2 ,- al CI al '- • • a ng �n CO o m m a . o a ~ m o m o .• .• ', ci al 4) �I O O . (n . �I ' 0 CO Z y (n Qj �I Qj 1 Z CUH :I ,a,H� EH01 CD HSI H� F-01 m1 )_ @HoI CUH- H . 3 Q yD� wDccl) 0D"- a D� DM ?�1 < mj°�° ,Dm aoi lL .1- re LT. vl Ire it iLL �I� W ap BIW T- 1 le'Tr 1 r-�I,, r- W I.L �1 W IL 'cr I I c I c I I Q m v.. NI' I T-'Tr �I� Q �I I g I CDO-J WN— WNW (/Na Q aNZ aN W aOW Na a..- Oooz 2 WN— (/)N W' I O mZQ mZO mZW mZQ mZQ .ZW m'O 0 mZQ mZO u O .-D2 I — zI m'W1 N a,'2I N'ZI --1�I 60- , �'2I �'ZI „ I 1 o '.SIU ooi0 OoiO u001U �o1U �pi0 �Z aau OoIU o0 u ■ I 1 co @ 20 1 20 1 20 1 o 00 1 2c) 1 O0�1 OWI rnp 0051 00 1 ' I 1 la ICI la Id_ la la Ill 1a_ I• I. /�/1444 J -..,1 m(n NMC/) um — w um— _Nm(/) um— N� _Mw _Nm(n _NmC/) 1 Q aci 0.- 2 w .- 0 .-Mo W w .- W.-2 0 .-2 .D ON N2 W .- W .- .-2 � 2 1.i. 5• U o 0 0 0 0 0 0 E. 0 0 ., W d N N N N N N N N N N O O O O O O O O M M M M M M M Cc)Ct O (O (O CO( O CO CO CO f0 r.- W W J V m o Z Q O M CO O M 00 ftl CD •- O : .- i ct CV ODch to I— Z �)- _ O N CO Q CO m r- O a , cn 0 m (c a c Ifi— < o a Q Z u) d U (gyp co Z (J) mm CO CD CO CO CO CO y m CD CD co a) co co co M i0 f0 i0 fa '0 M f0 lD !d N 0 0 0 0 0 0 0 0 m 0 0 0 0 co To m m m m m m m I m m m io co w w w ., w :. .. .. .. m m m _m m 0) m m m _m _m _m _m 0 0 � 0 0 0 0 0 0 it) > 'rn rn rn CD CD rn CD 0) 0) 0) CD CD CD • ~ I� in in 0 0 0 0 U) U) in in in M V . . V V V . V V V V c (N N N N N N N N N N N N N N •�• M 0 co m O G 0 0 0 0 0 0 0 0 0 0 0 0 0 C..) 0 2www wwww 0 ww 0a w 0 o cn C • • • c N • W • U Cl) Cl)N c • •. • N C 1 7 N ._ 7 C — 0 ,-„ CO 0 0 17 = 0 - 0 0 CO •• • L_ F F F_ `Z' Z U 0 c 0 rn1 0 0 Ce Tr O 111 w D D D D N 01 c O �, LL m 1 I0 1 I c CD 0 CO o U m m m 'o o m aa) v v o r .- .-1 N 0 U I o G D 1 w I O) 00 c Z .- N N N J N N N r/) �' C) 'LL03 ci o I OS I CO I OS I CO I Z Z r� Z = Z = N 0 In I 0 D _ z a)� a)� a)m a) l) -3--1 La CC 1 r j J )j Jla Z H J H c- I_ D F J ml Z Z co IL @ La-4- IU I� ico CU)F.:3U)= U)ir (7)C'") } >- c: Cf- CL co~ CL co F d N= D_J D M D W 7 a < 0 cn a)t/) 0 v) 0 U) VI cl U1 00 UI�I UI�I a jr_ ,rI�I co co Ice co IFI op m m j--=1 -- 01 I--=1 - D, m U m U m c m c ce Tr W W .- c _ C .-Li �U a ,� , �,� �I� a �, v v a -v .- o .- c .- c NOW a°z a0 LLow LL 0 0 m.- a).- m .- V.- U 0 g o J 1U)NLL mN_ mC'J mNLL mw S I (/)O (n0 (n0 c/)0 W N COW CO OD r°0 0 . .a= a))M a)Dz a)D(t a)LL 0 0 ;,aCV CV Z COZ �aC‘iZ CO cs,Z y m a)'CO N mw ai V z — 0C)=I U 0)1 U 0)1 LLC)=1 LLa or re 0-, 0 -, 0-, 0 -, LL c LLE LL a) LL a) _10 •L _I0 _I0 _I0 PZ c2 _1 Q_1m Q _1m 0_Im f0 ° 0 0 y 0 y 2 Cl) u) u) c u) c v) C O 0 c 'E .-2 *E .- 2°. •c — M Z C tt C w O O O O O LL 0)W a)0 O O OO O O O O I— y m U I U I U I U I I m U U-1 0 U-I I I I I n 0▪) a0)m1U N co(7) N co 1N a)m1(7) a)— c1 W M W a)m1 N 3 N- a)03 „c° N m1,.Oj N In N m a)cn a)m Ce a N IIW72 v) W7� i ; iii; WN N2 N2 W . 7r--.-‘c W � 2' W7ce W2 W2 W2 W2 0 Z EL o c) � cr 4. a 4. o s o s o 0 0 0 0 0 E. 0 0 WN N N N N N N N N N N N N N O O) O) 01 m 0 m 0 O) W m O) EL Dr W w J U CLm Z o 0o A fh O O M CO N 7 N M O r o CO CO Om O N O N O T O c., O O m CO CD co 0 c O _� CO N 0 In O N a E () CZ! ( w O J CO u < o. I H Z Cr C >- of CO • N m CO LU Q) cn I 0 Q ao a)_ Q o Q a!Z C c 0 U 0 C COE 0 0 z N m CO f0 N CO c0 N a) l4 9 m c0 c0 co co a) CO N CO N CO -O 'O CO CO CO CO CO CO CO CO 3 N IID0 0 0 0 N N 0 0 0 0 0 0 0 0 coco m CO CO CO I I CO CO CO CO CO CO CO CO co I m 0_ 0 0 co m m c ) -5 a 0 0 0 '0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 o In > 0) CD a) CD 0) 0) 0 0 0 0 0 0 0 0 0 Co F r- N- n N- N- co CO CO OD OD CO OD CO CO U) U) U) U) Lf) Uf) U) U) 11) U) U) LLD )C) 0 0 M V V V V V V Yr V V V V cr V T N N N N N N N N N N N N N N N N •E c•) O 0) 0 v : U 0 0 U 0 0 0 0 0 0 U U U 0 0 0 O W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a Iw w LU w w J J w w w w w LU w w O • 0 N Z 2' Z' Z 2' Z v cg o 9 • O O O O . O O ciaa ^-' N N rN N N NO 0 0) ' NU) r a' c O • i 0UaZ gI 0) L2 g co cn Q CO 0 c I ❑ c I❑ ❑ c0 ❑I ❑I c 0 • U O .O. ,L N 0 0 0 N N 0 2 u) u) 0 2 a) T o a_ c YI Z YI a' yl YI Z` Z` YI YI Z Z Z o E - J J J -J J _11 E co C z 2I d E o I a) _I a) _I _I a) a) _I _I a) a) m j ca O 2 2 2 2 2 2 2 2 2 2 _ c CO I CO CO m I m m I I 0 3 ILLI Q I I I I m N I I m 0) W Q ao- it W I m m Q m Q CO m Q co _m m (1) 0 m dI vI N E O > - > > > - � > > J N ao co H a_o ao I- ao a_o-p a_o F oCV _o H cCV _o co-p c_o I- W I- ao O O aa)a) ca YI D ai o) ai YI ai rn hi YI ui❑ ai o0rn ai YI ai YI ai❑ ai rn Gi YI hi YI hi QZ it c y 0 ) � 117 JI d1— m 0 o 0JI o o c)JI _o o 0 m 0cs) caJI _0it JI _o o U w 0 1 0JI 0 `1 .c •Eo c= co pn W cJ c2 E EJ E2 E EJ c co c=W c = EJ c , c= c = E ` Q co t,i- -a'031....6ma 2 c °mIm o ocum 20, oa omin❑. ooptn o c:') op_ oopl ooplQ o J a)(7 a)m N ,_< a)= a) O _a)= _N_m O 0. a)= N Q N m 0 t.N m p a)= N Q N m N m O a) C/ a mc W ❑ W.- ❑ N I a]25 W J W❑ W ,-J W ❑ W 2 W J W-J W ❑ W 2 W* W , J W 0 z Q r V Tr V 7 V V V a 7 V V Tr 7 '1 V CL 5O O O O O O O O O O O O O O O W N N N N N N N N N N N N N N N O) N N N N N N N N N N N N N N /1/ O J n Cr) Cr) CD CD CD m a) a) a> a) a)a a> a) W W p. Q 9- l� U m O Z 8 Q iii wTr o a) o 13. rO 2• o T O N O N p r E U =' o o m Q``r ao toa r ~ 2 v C >- o GN CO Q N M COh. O a) co I a Q a o a) < o a 0 z E U d co c E ca 0 Z as a) `m co ca a) as a) ca m ca as as co ca co a) !a fa 'O co fa co co fa co co co co fa co co co N 0 a N ❑ a a a a a a a a a a a a - c a) o I as o a) ca m a) as as as as m as m ) o_) o) o_) 0) o_) _o) 0) 0) _a -o_) v_) -a_) o_) o_) v_) ❑ ❑ J ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ U) ao > 1 0 u) u) u) ucouu) u) u) ) co ) u) co u) u) u) 0') F Ico 0) 0) rn rn rn rn rn rn rn rn rn rn rn rn rn M N- N. 7 N. .or 7 N- V V V N- V V V V V R r �N N N N N N N N N N N N N N N N N .` M CD O 0 v w C U U U U U U U U U U U U U U U 0 E O d 0 ❑ ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d 2E W W J W W W W W W W W W W W LU W O -- O • O N • w • • V V . N O y o X vi w C E o 0 a o a J Z Z `' c%.1• Z N N N LLI = m O) m Of >, (n cn O Z a) E �I J c J c J c J c o o ) U_ > > 3 d m Y a) _ = m = m HE = Z c c o D (n co !n 2 — o O O D D (n LL LL > NIE iE IE U CO- CO CO FI %- a 21 0 o 0 o 0 o 0 0 0 c IE 21 21 LL it it J co y E 031 L' E E Z E a' E W i m m a O mit E o I o 0 o 0 o 0 o 0 I 1 78 Z 1 2 2 2 22 co myE 2 E _ 2 E E _ I m_ mm m m m m m— cw v m yI m N1 a 1 a) a 1 1 I Im Ru- a• gyLE CL LE LE m Cr) m it 1 m@ m I m o I m I m o m 1 m 0 m m m m 0 . _ _ J c0 a- s as OD Q1 _ DO QI 00 N c0 N 72 m co�j N al—coN wo co w W co co C) Q ai ai ai ai Y1 ai c ai Y1 ai YI ai Y1 ai Y1 ai Y1 m i— ai Y1 ai Y1 ai Y1 6 (Li ai iiiZ LL LL LL LL, 0 0 LL LL O LL O Eo Ea LEO Mo LEO LL O LL LL LL LL x O 0 0 0 - _I ( _I 0_ — 0-1 P_ _ ' ' ON cmccccm Elco cm 2 'c2E .c2c2E c2 cz c2 c2 ca c •- co Ex N 600000 2mm20 om omoom omrnom omom omor of or or 4 0 0 w (, E 15_I-c; w E am ioIm mI15m10 mI mI ioI mI0 o 0 0 0 0 0 a maama0 mm a0 mmo mmo 0 9292mmm mm m a ce Q Iw w w di c) wLE0 CO c) id o_ wa-J CO o_ wLE-J wa 55 0.. wa wLE E5 cc 5]cc woc 53 rz 0 z Cl. O 0 v v v i0 v _v v _v v v v v v v v Tr v v O O O N O O O O O O O O O O O O O O LU d 1(N (N N N N N N N N N N N N N N N N O N N N N N N N N N N N N N N N N N /�/ J O) O) O) O) O) co O) O) O) cn O) CD CD O) 0 O) O) iCL LU W Q` (10 4' 0' UJ J V 0. m (71 Z Q rTr V m o a) m O J 0. w O wa c O O y TrN O Na E 0 N U o J m Qa H ch ~ z Tr , C >- of /G/� N W Q m coD n ' LIJ /= O a) A m m 0 Q a o 4:4 o a z E p E U m z m m m m m m m m m m m m m m m m m m m m CO m CO m m m m m m m m m m m m m m N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co m m m m To To To To To m m m m m m m m m At 0 0 0 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 c) 0 0) > 0) 0) 0) 0) co co co co co co co co co co co co co (o F 0) 0) W 0) a) o) a) a) a) a) 0, a) 0) a) a) a) a) a) ✓ n n n r r- r- r- r- r- r` r- r. r- el v v v v v v v v v v v v v v v a v v • N N N N N N N N N N N N N N N N N N N G• CD +0 o) 1 C.) U U U U U U U U U a a a a a a a a a C7 EI 0 a0 0 '0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 2 I w w w w w LU w LU LU LU LU LU w w LU LU LU LU o o V- o N Q D N O — V cO O Nr O) CO U D. CV o C C . . Z N m J J C J o J C N • • . CO N U CO❑ ❑ O) _ = O) = O) = O C_ C_ CO G co aD LL LL LLI C ❑ C ❑ c ❑ E ❑ U) LLI it it '� O a) .c F y 0 O 0 o ❑ o 0 O 0 I I 2 H a o z a� o o Z E Z E Z E Z E w CO1 coI coI z Z D E a O- 0 a) O a) 0 a) 0 a) N N N N D E 2 E 2 E E co m m m } ___cu p Q y o o m coI Cl) NI Cl) NI a) NI LL d a a Q a CO U 0UI m2 m N m2 m N m2 m N m2 CO3 N CO CO CO CO CO w �2 �2 ❑I j ❑I j ❑I j SOI j w J O a)w co w oo 2 ao 1— ao 2 QS 1— ao ao ao ao ao ao ao ao O 2 N N — N N 2 C) O 0 cc 2 YI ui YI iii YI ai YI ai YI ui YI ui YI ui YI ai YI ai YI ai ai ai ai ❑co Ce — w ❑J it it LLJ LE LE LLJ LLJ It it Il LL > it it X w Y▪ rn Q o_I 0_I v_ _I o_I a_I c)_I O_I 0_I o_I 0_I O-p ,..) (13 (). O x d < w OW E2 rn 'El u) •E 2 .E2 E .E2 'ES E .E2 'E 2 .E2 .E2 'E O- 'E of 'E m 'E Ui O w N 7 til Om 2. Om •p Om Om O) Om Om O) Om Om Om Om Ot 2 >. 2 > 2 >. rn2 I 1O I IO I I I I o Ot-t< CO wm ? ? mgyo ° mm amm = o- N N0 m ?mc m m o ° m m oo (Dm ° o o o - Ce Q J wLL ❑ ED ED waJ ED ED ED ED wLL ED ED cc ED ED di u) NJ CL0 sr sr sr sr sr sr sr sr sr .1 sr sr sr 77, 0 0 0 0 0 0 0 0 0 0 •0 0 0 0 WN N N N N N N N N N N N N N N N N N N N N N N N N N N N O Ce J 0 a) a) a) O) m O) a) a) o) a) a) a) a) W w CL O. 0 t1- J V a.m Z < Oco R u, O 0 m w J/� a. co li it, E o) 5 T O O 0 N 0 G N 0 a • r E 0 N U O J m Q I— — a I— F- 2 v C o L N COm• co m r— O a) CO Q N 0 Q as of I Q 0 EI Gz °d U N u) E co ccoo co 0 o Z U) CO a) V co co co co co co co co co as co co co co V to N co am 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i 0 2 o m m m m To co co co co to co co co 2 CD 'p) '_m .0) 'a_1 'p_) 'p_) 'm_ .5 '_m 'O_1 '_O) 'O_I 'O_) 'O_1 IT o ❑ J ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ J M > (C r r r r N- r N- N- r r r r N- r N. co I— O) O O) O O O O) O O) O) O) O) O O) O) O) N. n N- N. r r N. N- N- n r r r r r N. Cl) V a V R V V V T N N N N N N N N N N N N N N N N N .` M C o) O aUv r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c.) E O d 0 o ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 cmQ a 2 J w w LU w w w w w w w w w w w J 0 • o 4-4— o N. Q. • O. (q o — co o , c C u U % a o a o . m I N N Z = = p C J C O C J C N co O O) _U CO p)0 _ 0) = CA = m — 7 C C C co Q O D .-LWL LWL C C 0 C C IL it Jr c, �1ca .0 Y 0 b in 0 p 0 p 0 p 0 p 0 I I I F mz v c ai o o Z E Z E E Z E w 0) 0°i cal z ai< = Z E E E E E 2 E 2 E 2 m m m m cw 3 a)U 0 a) NI a) NI a) �I a) NIQ a 0- a a LL2 03Cil co 21 mo mQ1 mo m ,J mo mQ1 mo m m m co LLn j Tr � > ; > ;> ; > Ya--- ao,,,E- ao N ao o ao ao ao co' ao Q dJ (n co ao N a!)N NI I m m �YI tiYl ai YI ail ai I uiYI 6 id id 'ai ai ai ai ai 0CC LLl0— Z o F H F H F F H F F I— W M (n O J LL J LL J it J it J it J Itoit it it it It a co 0_� _� v_� c)_ _� c)_ 9_I c)_l c)_I 9_I Q Q. 0 U 9 ()x a < 0 JI 1.0 M E l co 'c 2 m 'E 2 'c 2 E 'c S 'c Z E 'c Z 'EX 'El 'EX 'c o- 'c ui 'c v> -c vi O w "c N .@. Om f0 Om-p Om Om m Om Om m Om Om Om Om 2 2 >+ 2 T 2 >+ rn= 2° �/ `� om m wm m 0m .5 m o .5 U Om o 0m .5 m 0m .5 m <D O CD 7 ID 7 0 m c.20 ? Z g Ids Q N W 0-0 W 0-0 W a W a J W a W E J W a W a W a W a W a w u) W(n W U) N J W-0 0 Z ` O Cj v v v v v v v v v v v v v v v Ci. o 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N LU O N N N N N N N N N N N N N N CO —I N IfiY 0) O) O) 0) a) O) a) a) 6 m a) a) O) O) a. 4. O.. o.� cl-- W w 0 pap Q ZCV Q 0 on ` N CO O co a) in N C. 6° O U) ad 0 o Sc O N co 5-4- p , V E o, N o U o m o Q Tonco a. I— - l''_ Z �_ 7 (NI CO Q co CO n = iii O a) CO 0 co 0 Q a co °; Q Z EI c E co Z En a) a) a) (o @ (o co co (o a) (o co co a) N a) a) 0) N (o co co (o m co to co m co a) a) V co N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ami 0 O To (o (o (o (D (o co (o (o (o co:tc co co a3 I Co S E)) O_) o_) _rn o_) o) o_) o_) _rn o_) o_) o_) o_) o o) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J 0 o � > Ico co co co CO co ao CO CO co CO co CO co co 0) Fan a) w rn a) ca a) a) a) a) a) 01 a) a) a) co (1,71 n n n n nTr n n n n n n n n n n co N N N N N N N N N N N N N N N N N M O O w `-- 0 L) �, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C7 O E 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0. W W W W W W W W W W W W W W J W o . • N DI LL DI LL v LL ^ o c DI a < =I o d l¢' z N CO o _1 Q I z 7 a a >- a CO CO ca Z J Z I Z o �I Q IFI COI p 2 a p p -I ao c '' M C) 'LL2 LLQ LLQ 0 M Q Q Q mlo C I hi d1 ui coI ai In("I QI al col 'I LLI Z i CO 0 < b z E E E� 2 2u) 2 2 2 L t ° 3 CW N CW CW W W J Wq) W W } U LL m IT)2 m :F ° mg 2 2p 211 2 2 Q m a) o LL.4.1:5 it,.I m ii�I 0o vl 06 v1 V 06 v10 00,I 00 �I CO o `p a 0 ' �1�u) �1� D �I�0 �I� �I'- W U U I y o a y o D G)o LL O— LL O d a O D d 0 d 0 0 J lu)ah Cao W2 M2- 0 °MN- M2LL CO M2 M �', V TWO 2WM .9W N •jWU ii)LI a)Wco M aiWJ a)W co = H Z O N O N MW 1 O I D N LL N a LL N LL N LL N O LL N C Q Y 0 0 JId 9 JIB 0 JIU C)JIB 0 JId 0 JIB c)JIV 0 JI LL d 3 I co - C00 c0E- CON cpLL 'c0O c0H cp o E N N 1 OJ00 OJLLO OJOLL) O J01 O JOO OJLLO — O- cmoo E } } V) U m1� U aplo U mIM U m10 v m1� v m10 v coM v m1 ,-.< O :o a) @ a) r a) O a) Z a) f0 N r a) O N W V 'WT- LL W . cO W ,- I WHO W7d WT. 15 W� ..I W : NS OA C)O V V Tr V Tr Tr V a.. d i y0 .p. Om �~ U N N N N N N N N E N 7E En co 0 W Q' co CO c0 co a) CV CON Z 'i, m Ce O N N N N N N N N N 0 J CD 0) rn rn 0)O. Cc) E W x W _1 °" m �, a V m om J co Z o 0 0 d co a0+ .- 0 CO 0) TO N O O 0) J 0 v E S o O. CO 4C" 2 U U C N N C rO O e- 0 o y O N N / CO O p E V 0 w 0 a ...... o a 1— ,_ e_ . . l.H vO coN 5 GM N 0) CO C N Q coW °' N E m o I— E WC /) 0 0) to .c7i CO ti CO = a7 CO U Q) C 0 C E p QrZC ', f0 O. a) C U d p C Q Z o E a 5 o O 0 E V c 0 2 a CO co p z W CO CO CO CO CO CO CO CO N al $ N o � o 0 0 co o o � c COco CO CD CO 03 @ CO w = ° m .0)- 0) o) 2 0) m 0 0 0 0 0 0 0 0 0 0 o E 0 ^ o U) > CO CO CO CO O) CO o m o 0 W w I— aaOO a00O o000 ODD CO aaOO a COO a°OO 0000 OD OD c w CO o M V Tr V V V 7 V V N V 0 0 r N N N N N N N N N N W N d a) CZ p c U) E E z a co .16 co ''1 y co Z O cc @ o o Q o 0 v :, • 0 0 0 0 0 0 0 0 0 G 2 •N U Cc7 V0 n o II o wwwwwwww 3 U. U0 d a ° z LL D I 0 0 0 N N 9 cV 0o O I z H a N1 C o 1,4T o p 6 o N) z '\,_ 3 F. J `' C.) O ` � Z 2 7 y f0 W J o Ce g112 I 0 IX 0 J a w X W J V COa. O Z 8 ICC R w `m c AJ o 1.• L0 C O N a r E a V N U m o m E E m Q rco ° a H ~ zTr C o CN CO Q a0 m N. La � 0 a 41 Cl) p p 0 Q ao %CI Q o z E E CI it) ci is z m v v • La N N N CO CO V 0 0 d N co N N = N > W m K • rn 0 a w . d O Z C m O o a c.) E 5 a m w E .a o a.a 0° c� m ° 0 1 0 bp Date 16-JAN-2015 0 Transmittal Number: 93399 c2/3—rg5 7g7C3 BPXA WELL DATA TRANSMITTAL RECEIVED Enclosed are the materials listed below. .IAN 1 6 2015 (BPXA LOG DATA) AOGCC If you have any questions,please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Digital Log Data: 18-11B 18-11 B BHI LTK Mem_FE Composite Drilling Data.las.dls J-30 BP J-30_C1_18Jul2014_IBC-MSIP SCH Repeat Pass_ConCu R1L4Up.dlis Angela K. Singh Please Sign and Return one copy of this transmittal to; gancpdc@bp.com Doug Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Meredith Guhl 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage,AK 99519-6612 STATE OF ALASKA 4 ,,,, ' ED • AL ..KA OIL AND GAS CONSERVATION COMM. .ON UL 1 2 l' 2014 REPORT OF SUNDRY WELL OPERATIONS 7491 Operations Abandon❑ Repair Wel1I Plug Perforations ❑ Perforates OtheAt Performed Alter Casing CI Pull TubinCI Stimulate-Frac C1 Waiver❑ Time ExtensioG /del ire h Change Approved Program❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended We❑ 2 Operator 4 Well Class Before Work 5 Permit to Drill Number Name: BP Exploration(Alaska),Inc Development 0 Exploratory 213-195-0 3 Address P O Box 196612 Stratigraphic ❑ Service 6.API Number. Anchorage,AK 99519-6612 50-029-21181-02-00 7 Property Designation(Lease Number) 8 Well Name and Number. ADL0028321 PBU 18-11B 9 Logs(List logs and submit electronic and printed data per 20AAC25.071) 10 Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 19493 feet Plugs measured None feet true vertical 8625.16 feet Junk measured None feet Effective Depth measured 19378 feet Packer measured 12897 feet true vertical 8640 75 feet true vertical 7755 01 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91 5#H-40 48-128 48-128 1490 470 Surface 2461 13-3/8"72#L-80 47-2508 47-2507 98 4930 2670 Intermediate 2629 9-5/8"47#L-80 45-2674 45-2673 91 6870 4760 Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 17280-17630 feet 17850-18180 feet 18230-18550 feet 18850-19000 feet 19330-19358 feet 19358-19360 feet 19360-19378 feet True Vertical depth 8686 95-8681 09 feet 8684 7-8691 32 feet 8692.6-8703 03 feet 8691.75-8683 57 feet 8647.27-8643 46 feet 8643.46-8643 19 feet 8643 19-8640.75 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) Treatment descriptions including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 3306 5093 0 0 392 Subsequent to operation 2323 1754 65 0 415 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run Exploratory ❑ Development] Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil 0 Gas ❑ WDSP❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP ❑ SPLUC 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C.O.Exempt N/A Contact Garry Catron Email Garrv.Catrone.BP.Com Printed Name Garry Catron Title PDC PE Signature ii,•,_ _ __, C.:, \) Phone 564-4424 Date 10/28/2014 VI-- e Z/z Z` .1- •'C P.75- - ABC MS OCT 31 2 Form 10-404 Revised 10/2012 Submit Original Only 0,0 O O o 0 0 0 0 0 0 0 L- co <- NI" 0CD0 Nr00 r - vLnLnLOLn () LOLOLn 0 V Ln CO N- N- CO N CO N- N- U N 0 0 0 0 <- 0 0 0 0 0 <- I W N- V N CO CO O M N CO M 3 Nr CO N NI- CO (fl CA CO CO CO Nf O) CO 000 N CO CO CO O) CO N M N LO Ln In In I-- O O O N- O N N N O LO LO LO CO N O CO CO O Ln CO CO CO N CO CO CO CO CO N N- H 00 CO CO CO CO O) N- N- N-- CO 00 Ln Ln 00 00 co N- CO CO M Ln CO CO CO 0 N N- N- N- N 00 co co co 0, co co Co 00 � M 03 0) CT) co O N 00 CO CO O O O V (0 4-, N Q M m o (fl (fl co CO CO 'n N O O O N- N- M CO CO �N V �f n M M O C NL - 0 I—� J 9 Ln Ln Ln Ln LO Ln O CO a0 CO O 00 CO CO 1. (o UUU m00UUU O M CO Cr) d J CO CO CO • *k J *k *k *k N *k *k *k N N Ln - *k CO co CO@ N- (D CO CO (U (/) CO M N N N m N N N O Eo CV r O - LO N- N M N N N co N N N t N Ln Ln Ln o0 CO CA •crV O (3) J N OQ M CO O N W CC Q W V 0 W rYcCcc rYU u_ Z z z Z W w W W Wct m m m O H z_ z_ z_ z_ < D D J J U Z J J J J CL U) Packers and SSV's Attachment ADL0028321 SW Name Type MD TVD Depscription 18-11B PACKER 2526 2525.98 7" Baker ZXP Top Packer 18-11B TBG PACKER 12897 7755.01 4-1/2" HES TNT Perm Packer 18-11B PACKER 13027 7857.76 5" Baker ZXP Top Packer 18-11B PACKER 19234 8660.48 4-1/2" KB Packer if V in U 2 Q N U) H O c as o c Q-a o c O _ - 3 = N O I` O O C : CO ) Ln N 00 0 p Cl) U O +. co (rj C "a Q O u7 a) a) 6) 0 U (a C C - O a) CO Z CO a) a)-0 co a) "a N Q V N O r= a a) C O O - CV I- 0 Q O -a a CO * 0)Oc C co • (N a) N N a ; o +• f� a CO N o a) 0 0 coc7 Q n CO Q o0 o J O- a) in -a a (0 6) a M N Q > c- a) 0 C COa o a N U N- C a) w o) J o C D a) HC- _a a a) .1- - D U) _D � O - U L -� ` co a co a) o C co a Q O a7 O 67 a L N O a) Q 3 a) ° OU �0 cn _ 'Lr- ,- O = C U 4 a 2 in C . CO H M Q F- p (n ti N O 0 ct Q O 0 co6) a)O U 0 r- CO N +J o O (n O C a) f-, 0 C a) N- 00 na) N - a) _ '11'- 0 O u) >j E 5 ( 0 Q-N C E M L U 2 c _ � — a H eo � C, C °) O0 nU O d > 3 v cu N _. N a) o O CO `� v Q t 0 = a) `t H N -C O -C t 0 0 C r U a' 0_ a) • O E 'F Q O Q O a M a) > -a = 'C N 6) m E C a) O "a N co > .. O ED > - 0 0)-0 C CO .>_ * 0) so N .C * 0 (tic U * (n C (d •O U * 2 C O 0 a) a� _ •0 w * O �' Q � .c (1.) .6 U O O m 4- O —' Q O * _a v- ._ -a U CO •-a = 0 p � N 0 d � Y o 0N - = � coo � 0 SONO — a) O Q co c CO U (NO M 0 O aD C a) 0. = O fl CO op 0 26 �O v C co -3 0) . a7 00 O a) = _66 M C 6) a) (A N- Ce CV -n Nr— a) 6 N >W Z � (0 ao a)o � rn � Oh � oN (V > ( (B co L (n N > = O 6) 67 C 0 6) O O •OcN1 9+ (N + _ _ O V O > E N- F 5 `o 0 > E U c cm ° 3 rn -c-1 CV Q --- CU p U o o 0 C U o U O C m 0 H o rn U_ o ._ O 4 C o E .n a E o 0 m o m o rn a ami CO a) C ami O •o m = u c U o O 0 0 0 (j) 5O a a) O O M U U 7 O -' C � ;� o m Q- � c �n •c0 o0O c}u cu � .� � Cn .E0b O c � cin (0 a� a C Ca. a)Hw >, `� a-• C UN� Ca. 0N � C a) M c- O .� 3 C U O O N N C O (n N- O N Z O O * _a Cl) 0 > _ � * _ _ 0 0 _ 0 � Ornin C , . COin Si 0).2O = a a� a) a) a 0 CQo CO -O� H * Cc''. C C O c• * H * O O N'a 18 .*K * H * O ==�y•� to N *k U it a. l� L a. r * 0 * LL 0 U U L CO CO {t it 0 : U LL Oo (n3 ®x r r r OCV O O CV0 Q co N 0)t _ 0) Q _ .- ' IN N .L Q Q CO LL E > _ Ln U -0 (O M _ CO ~ c CO -O O a) 0 O O ct _ m � rn a) 2 a3 O I -o 0 (O •- a) >, a) - W U = (LO O E I C 2 o >O N C O (O 2 0 acp) -o L.L. to O N Co N (O Oa- 00 CJ)_ 0 CO 0 I c0 C L Q OW co � 0_ • EO ' b f 'tom a) o E U m L- O 7 0_ J LU Ln a) 0 - 0 Ur a) cn > N •V tea) * ¢ oo � � * tea) (UMC * p O Q O N m N M 'a' El-) - c- * a) U o c * * * a O O _c N o N * Q 2 J rn * c' 1.0 o O * C +_3 C7 Cl) 0 O I Q V c V tY c U -O = ,- CO 0 r' 2 p),- I r a _ a) N C " 3 0 co O CO c '� O N >' U c .0 0 U) a) N _ 0) m� N O m 0 N N co 0) O • O C .d 0) t` Co Co rn E m 4 rn 4 I o CO 0 D c a E cri c�i E E _o L cd O C ino E0 2 E N ° O E 4--c -0M Q E `yo) - 0 W Q _oooQ - o c ,- c o0 rnrn Q w � � Cr) ++ = O N J "a J Z M -0 N Cr) -a I a +�, N CU co 0-5 ` W a) U or) a) U 12 C OO a) � _O � rn Q a co C (O Q c -O •• -c 9 C co a O N a 3 a) c co CD U o N x o 0 a� E rn 0 O O -a M a) I C O O O O N n ,-- E I v 0 c v -0 L a) LU > 0 - E O N c E � oo E o a) � rn o a) N � * 0 � rniol - a) o � .o - 0. _0 ,- 0 _ a Nj N * * `70) * c U cn o :Q,- c c c oa * as I § o * 0_c 0SN � * ao m o o C J (-) o L 3 co : * a) = m Q * a) co a a II * a) U o t o rn rno E �ov * -- O a) C I -a m a) c�* U U O < O c a) () * L .. - * .Q C Co w a) U W ,� * 2 rn O * 0. •$ E Earn 4 � o co tic co * Q o _0 U) co a) � d" -0 o Cir). . rn W' N O r_ f� 05 ZE; N co DI a) 3 U O c o a •• a) a) a3 CO rt V U) Z c U (O V (� p) a) rn d N '� O U O N U) Q N N �+ L E fn (-Ni II ' 0 O a-, L M • N II a) c > w N II •t a N II E cn O > a) ca o rn rn > m 3 0 0 o a > m co Q > E 2 .5 I m rn0an rn ° V- � oUa O •io � ,ri .. oO) Ua n. a) Orn CO UI* NI V � � UI O:: 0 .0-SIO OF- 0) N 0) oF- dD c7d L_ OF- rn =0o0 QcDm -a0 J >,rn .� -00 Oc rn -00 OO ca i -o U O E as T aY a O Ja . C � - JI 0 0) o ooa) •cwo cai ai C 3 0 -El 4) a 0 - o Ucai O Lo to - Lo N ' > 0W - mO °°� oMoC •- �> d Ln �+_ CC 0 ~ Lo a)3 c > O N `." ` CO Oa) a ° N-O .- N O _ c c - o U OO 3a) a) OcU _ x N U 0) m E _ a o °) OteOo °) O 0") 0 a) _ o aa) c `O DC. co ao ai ED rn o .: oILio o -) c _c 3t -) _o c -0 L � _0p)(I) c0 .�co o —) _o C EI - -) O -cDoa) * roOoQo00D * F- Oo , - arn _o * I- oO .LrnU * U E Q-ori : 0Ume120 oral' 0 --) H ‘- co : 0 - 0HT.L .- * v v v v c) c) c) 0 N N N N o r N M N N N N cn co co '/ \� c U oc -a § D w _ I- 0 % 4- o / '- CO $ Q 1 \ \ = CO / ` k / \ � / \ / / \ \ \ § k 2a / 0 ® \ ƒ % 2 [ % EO > - $ $ \ N ± 3 a) r $ / § 0 0 w 0 2 0 0 / _ a 2 ? \\ \ E ? \ƒ ƒ E \ \ / / 52 I U 0/ E � 3 _ § \ ® 4 ® -I O I O \ / 2 % \ / C \ \ \ � / � k / 5 ƒ \ \ n 2 0 # / s / ± ¥ 0 < < { / 0 / t / c $ E / ¥ \ g / / c ® 0 2 2 __F-- 0_,_ 2 EC / % _} $ \ c ƒ p 2 2 oeL- - ± 2 -0 _c c - f < ® N 0 \ / ® F § ® a) \ / a) /f ƒ a ± 2 0 » E W g 12 g E < ± 2 I E < .$ / -0 k O 0 Ok 0 C R / / - o * 0 ® CO \ 2 O @ CO .S 0 CI / / / ƒ a) / < / - 0 c -o �< oa � i o o i % 0- 0 / ƒ ! c 7 2 » Op O * / /\ / / W w \ \ I L \ y / § / • D =/ & » i o CD_0 I < CO 2 H # m = ' COW / � � / f / 6 \ / / / \ e CO co < � � / � 0cm c co co � � w ® c 2 w = a R R CK g ,_ 2 5 7 II Ce 7 $ / 0 / 7 $ / \ 2 \ / 1 $ O / / / 7 0 ---i ? \ $ - g \ ? o E 0 2 % ® g & § / $ \ - ® E E m G I 2 E * 0 < k " w m 2 E _ . 0 $ ± ▪ R t / / 3@ 6 0 0 2 - R I u I & c E e / / •0 R § / \ IE \ / \ f / \ / / Ew / \ ƒ k \ C) r � 2f b & 0 9 / a 6 2\ 0 $ O O « / « R / / E / E \ » E / f \ 2 $ ƒ E/ 0 I \ 0 0 / 2 k 2 ® D R \ / \ / ƒ < 0 - oz - � < of-a) � \ D / � / \ D / � g2 \ ƒ / wCC U-I kin00 / fesEnHE 0 \ 0 § i 0 k 0 o E i i \ w / % -? } i \ / ƒ Z \ # t \ 7\ \ 9 9 e ® N \ co N » a a a I Nth= CNV H4-1/16" Q WH_L}fAD= McEVOY 1 V-11 B SA. NOTES: WELL ANGLE>70°@ 9038'"" +ACTUATOR= BAKER.C MAX DLS:14.6°@ 14064'. OKB.ELEV= 56' BF E._EV= ? KOP= —2674' ' 2014' H4-1/2"HES X NP,ID=3.813" _.. ../j Max Angle= 98°@ 19174' 20°CONDUCTOR — ? Datum M).= N/A 2524' 19-5/8"X 7"BKR HRD-E ZXPN LTP w 1TEI3ACK Cattail TVD= 8800'SS SLEEVE,D=6.19" 13-318"CSG,72#,L-80 BTC,D=-1-2-3-477-'71--f 2500' l 2540' —19-5/8"X 7'FLEXLOCK LNR HGR,D=6.22" 9-5/8"WHPSTOCK(05/13/14) —I 2674' MLLOUT WINDOW(18-11B)2674'-2691' 97518"CSG,47#,L-80 NSCC,ID=8.681"1r ^-2674' GAS LFT MAPDRE.S Minimum ID = 1.83" @ 2978' ST MD TVD DEV TYPE VLV LATCH PORT CATE L4-1/2" STRADDLE PATCH ASSY ..-.r... '6 2996 2994 12 DMY 0 09/28/14 L. _.__._._.____^ ___.__—_� —. 5 4638 4239 62 KBG-2 DMY BK 0 07/06/14 4-1/2"45 KB STRADDLE PATCH ASSY H 2978'-3019' = 4 6363 5089 59 KBG-2 "MN BK 0 09/01/14 3 7673 5753 60 KBG-2 DMY BK 0 07/06/14 D=1.83"(09/29/14) 2 8613 6204 65 KBG-2 CMI' BK 0 07/06/14 1 9013 6357 70 KBG-2 DMY BK 0 07/06/14® STA#4=WAY HAS EXTENDPACKING TOP OF CEMENT(06/09/14) —I 12665' _ STA#6=GI STRADDLE(COVERING#6 @ 2994'-DMY-LEAKING) 41,4 A ISI ISI I12865' —14-1/2"HES X NP,D=3.813" A�4 4 ir,`�A IV s. 12895' —17'X 4-1/2"TNT FKR D=3.856' 4 12929' —14-1/2"HES X NP,D=3.813' I rI 41 13001' —1 4-1/2"HES XN ham,D=3.725" /;I I+ I`4 A I`L Hi TOP OF 4-1/2"LNR 13014' 1+ 13014' 7'X 5"BKR HRO E ZXP LTP w 1T>E$ACK A I 1.4 SLEEVE D=4.34" 4-1/2"TBG,12.6#,13CR-85 VAM TOP HC, 13017' �'i� ►�+�� ,41...A j l I r'.,N 13017' —4-1/2'VVLBG,D=3.883" .0152bpf,D=3.958" +�` � ,• It ti.,,N.. —IBM))TT NOT LOGO 7'LW,26#,L-80 VAM TOP HC, H 13446' I I ,Ii.•I It ,I1 Iii 13048' —5"X 4-1/2'XO BUSHNG,D=3.86" .0377 bpf,D=6.276" I'I` 'I�I`4 �� ,Ii N� 13038' H7'X 5"BKR FLEXLOCK LNR I-IC�D=4.31' PERFORATION SUMMARY ,lb WA+ VA ENSIDETRACK13605' H6.125"OPHOLE SIDETRACK REF LOG: ANGLE AT TOP PERF:92°@ 17280' Note:Refer to Production CB for historical pert data I; A 14466' HTD PILOT HOLE SIZE SPF INTERVAL Opn/Sqz SHOT SQZ I+ 2-7/8" 6 17280-17630 0 07/04/14 • 2-7/8' 6 17850-18180 0 07/04/14 • .. 15002'&16713' —4-1/2"PUP JOINT'S w/RA TAG N 2-7/8" 6 18230-18550 0 07/04/14 ; Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Monday, September 29, 2014 12:45 PM To: AK, OPS EOC Specialists; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM; AK, OPS PCC EOC TL; AK, OPS Prod Controllers; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr;AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; Daniel, Ryan; Cismoski, Doug A;AK, OPS FS1 DS18 Operator; Oestgaard, Finn; Regg, James B (DOA);Wallace, Chris D (DOA) Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; AK, D&C Projects Well Integrity Engineer Subject: OPERABLE: Producer 18-11B (PTD #2131950) passing MIT-IA demonstrates competent barriers Attachments: image001.jpg All, Producer 18-11B 9PTD#2131950) is a naturally flowing well that BP had permission to operate with known tubing by inner annulus communication while performing diagnostics.Testing has been completed, and a straddle patch has been set over the washed out gas lift mandrel at 2,994' MD.A passing MIT-IA was performed on September 29, 2014, demonstrating the presence of competent well barriers. At this time, the well has been reclassified as Operable and may be brought back online. Please use care,as the annuli are fluid packed, and will be susceptible to AFE. Thank you, Laurie Climer BP Alaska - Well Integrity Coordinator GNGprgan zat:ol Wellrs U Y M i WIC Office: 907.659.5102 WIC Email: AKDCWeIlIntegrityCoordinator@BP.com 1 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Monday, September 29, 2014 3:35 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Burton, Kaity; AK, OPS WELL PAD W;Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; Regg, James B (DOA); AK, OPS FF Well Ops Comp Rep Subject: NOT OPERABLE: Producer W-01A (PTD#2031706) Sustained Outer Annulus Casing Pressure Above MOASP Attachments: image001.png; image002jpg All, Producer W-01A(PTD#2031706) is not available to be brought online for diagnostics due to surface facility work.The well has been reclassified as Not Operable until well can be put on production for diagnostics. Please lock wing and hang appropriate tags. Thank you, Laurie Climer BP Alaska - Well Integrity Coordinator G'1A/ G:aanlWeHs VMY Organization WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Friday, September 12, 2014 7:39 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Burton, Kaity; AK, OPS WELL PAD W; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; 'jim.regg@alaska.gov'; AK, OPS FF Well Ops Comp Rep Subject: UNDER EVALUATION: Producer W-01A (PTD #2031706) Sustained Outer Annulus Casing Pressure Above MOASP All, Producer W-01A(PTD#2031706)was reported to have sustained outer annulus casing pressure above MOASP on 09/10/2014. The pressures were reported to be inner annulus/outer annulus of 1800/1040 psi. The well is reclassified as Under Evaluation and is placed on a 28 day clock to facilitate evaluation. 1 Plan forward: 1. DHD: Perform outer annulus repressurization test A copy of the TIO plot is included for reference. Thank you, Jack Disbrow BP Alaska -Well Integrity Coordinator GINGlobal Wells Organization Office: 907.659.5102 WIC Email:AKDCWeIIIntegrityCoordinator@bp.com 2 Wallace, Chris D (DOA) From: Wallace, Chris D (DOA) Sent: Saturday, September 27, 2014 4:26 PM To: AK, D&C Well Integrity Coordinator Subject: RE: Update Sept 25, 2014: Natural Flow Producer 18-11B (PTD#2131950)With Known Tubing x Inner Annulus Communication diagnostics Attachments: image002.jpg; image001jpg Laurie, Acceptable. Chris Original message From: "AK, D&C Well Integrity Coordinator" Date:09/27/2014 11:12 AM (GMT-09:00) To: "Wallace, Chris D (DOA)" Subject: RE: Update Sept 25, 2014: Natural Flow Producer 18-11B (PTD #2131950) With Known Tubing x Inner Annulus Communication diagnostics Chris, The well is still in the process of unloading. As a result, BP would like to keep the well online for another 48 hrs to evaluate the well. Is this an acceptable plan forward? The well will continue to be actively monitored, along with the strict guidelines initially agreed upon. Thank you, Laurie Climer (,111 r'�iulc:JucicD��hron) BP Alaska - Well Integrity Coordinator IMAJ 0 o,a1 Weiss V W• Ocganizauon WIC Office: 907.659.5102 WIC Email: AKDCWe1llntegrityCoordinatorL,BP.com 1 t r � From: AK, D&C Well Integrity Coordinator Sent: Thursday, September 25, 2014 1:01 PM To: 'chris.wallace@alaska.gov' Subject: Update Sept 25, 2014: Natural Flow Producer 18-11B (PTD #2131950) With Known Tubing x Inner Annulus Communication diagnostics Chris, Per our conversation on the phone, BP will attempt to flow Producer 18-11B (PTD #2131950) to production with known tubing by inner annulus communication for up to 48 hrs. The perforation intervention has been completed, however it remains to be seen if the well will naturally flow with the current configuration. The well will be actively monitored during this test, with the well to be immediately shut in if IAP exceeds 2,000 psi or the OAP exceeds 500 psi. At the conclusion of the test, the well will be shut to mitigate the annular communication. Please call with any questions. Thank you, Laurie Climer (.-I(i(';now ./(f(/. L111)i nlil BP Alaska - Well Integrity Coordinator GwGrob&Weus V�� Organization WIC Office: 907.659.5102 WIC Email: AKDCWe111ntegrityCoordinator(t BP.com 2 o G U i I V a QJ_ 1 Jn' Q X@ Q r .... I v N to hi aW m O ci , V) CO Y C QO�Y Z ❑ N O '0 -O t ❑ S O FE .,-, C -0 > Q < *It' V 0. rD O E CO C U . L J Y In Y T - a s aaaa a a a a a) a a) a) m a c es a � a) a a) m E a °' 0 d a) d d a a) a) a) a) a) 7 7 7 7 7 N 7 7 y 7 7 7 7 OV Y cn cn to N '2 N N cc) to < < < 5 ‹ � 7 ') c' Q < Q a a j 0 O y '+.Q M N N M . O ! O 00 O O ,- • N N N O two O ,-- '- t0 V co O (Q a) U e _ 00 O co O a) E -O V) a o co c CD IA c ❑ ❑ ❑ ❑ ❑ ❑ In ciao ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ u c- �'a v ❑ LW J .J J J J J J J J J J J J J J J J J J J J J J J (I) -Cw C> 112 LU LU W LU W LU W LU W LU W W LU W LU W W LU LU LU W W LU LU cc N t' LL LL LL LL LL LL LL LL LL LL LL LL LL w LL LL LL LL LL LL LL U. U. U o Y a) s v0 a J J J _J J J J J J J J J J J J J J J J J J J J J '' a) > E jtl.4 Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z E a) N O- - Co O ;❑ IL LL LL LL U. U. LL U.. LL U. LL LL U. U. U. LL LL U. LL LL LL U. LL U. c O _0 C UM TU v aY) :E C IL > > c CO❑ O Q aa)) = OU 4) co V (1) .L~ O U m iCNA O. Q' Q) O O w U U. LL LL LL LL LL LL LL LL. LL LL N L.L. LL LL U co `. ❑ W i- 0 0 0 J 0 -1000 -J000 -101- g J O O J O a) r q lY tY lY ❑ a ❑ ❑ tY tY ❑ a N ❑ tY ❑ tY (� ca W v H ce 0. D. a J a J a a Q. J a a a J a = F J a a J a ��\I ❑ I': m 0) d3 �" av a a aaa a ? a a cc as ‘-'co o v Jar II a Eti >- >- >- >- >- >- r >- >- >- Y >- Y i v) -1 -10000 J O O O J J J O O O J J J J O O O J WLULUUJ www w w w w w w u E 2 2 2 2 5 E E 2 E v ti) r �'CO O ao C .... X N O w .4101:1 G°5 E.�1 W a a Z Z Z Z w w z z a a w Q a a a a a a Z a Q W '° 2 m CO Z Z m m Z m m m m m m m m m Z \ F13 CO �r " f z O O a a a a m m a a 0 0 m 0 0 0 0 0 0 0 a 0 0 ce y , ❑ x s W w W W m m W W x x m x x x x x x x w x x m , .1 O ❑ Z Z Z Z N N Z Z ❑ ❑ N ❑ ❑ ❑ ❑ ❑ ❑ ❑ Z ❑ ❑ u) _ SW J_ J_ J_ J J J J J J > > > > > J > > J A ,- 0 V- ,6, W a' a' tY <Y <Y a' lY <Y C a0i '0';' D. C. a s a a a a a a a a s 113 v M ,- u-) It) M 0) M a r, co a0 o0 WN N M M co CO aO N N M N v N O N N NttD W 1* - 0 0 0 0 p 0 p 0 0 0 O p r. 0 0 0 p _ C C...) = 00000 .0 0 0 0 O O O O O O O O O O 0 p O O O 04 E C) . W O O O O O p O O O p O O O O O O O O O O p O O O N O ix" ❑ (� o Y Y Y o) ❑ D ❑ rn 2 2 ❑ ❑ = rn V ❑ 0 = o) p 66 O o W W O N O U. 0 (9 co U N v- co U. U. U En co co -) U U U. co (n N N �_ Lj m LL LL LL U ((.) U U 0 (.) U U U U (}.) 0 (.) (}.) U U U U U P 41 `" U U U U U ` M 7 C fl O Y C CID ce pie �Cp .0 m a) arnV1 Y G Q ytf> +v., U J Q '_2 O N M J In Q Q O m CO Q d' C C �. J S Q N r O a N O r co O r t0 ,a O COm a r M t0 M ;!...t O t0 ��' U m W '-'Z O' U W LL N M '- M 9 O N N 0 e- O M ,- O J O N @ Q) 7 Ol F- c 0 <J a m e- N N +, a+ N Z !C� '.LJ O O n E 2 E J J th a O J 0 Ur 00 a LL (n OO 2 .- O J +- ro w H 2 = C lJ O N E E Z cum O C/a RI tr, a � - - ( F- 0- a Q t PBLA 16-1(B Pitz(3m m5o Regg, James B (DOA) From: Regg, James B (DOA) I Sent: Saturday, September 06, 2014 10:58 PM -Rem G'1 1 ' To: AK, D&C Well Integrity Coordinator;Wallace, Chris D (DOA) Subject: RE: Permission to Produce Natural Flow Producer 18-11B (PTD#2131950) With Known Tubing x Inner Annulus Communication Your request to flow PBU 18-11B not to exceed 14 days (from startup) is approved. The well must be shut in if IA pressure exceeds 2000 psi/OA pressure exceeds 500 psi. Except for startup BPXA is not to actively managed IA and OA pressures. Summarize your findings in an email (copy to Chris and myself) at completion of flow test. Jim Regg Supervisor, Inspections AOGCC 907-793-1236 Sent from Samsung Mobile Original message From: "AK, D&C Well Integrity Coordinator" <AKDCWe1IIntegrityCoordinator@bp.com> Date: 09/06/2014 6:51 AM (GMT-09:00) To: "Regg, James B (DOA)" <jim.regg@alaska.gov>,"Wallace, Chris D (DOA)" <chris.wallace@alaska.gov> Subject: RE: Permission to Produce Natural Flow Producer 18-11B (PTD #2131950) With Known Tubing x Inner Annulus Communication For the majority of the time the well was online,the gas injection pressure ranged from 900—1100 psi from 08/08/2014 when the well was placed on production to 08/29/2014 when the well was shut in. There was a spike in the pressure to 1700 psi on 08/25/14 and 08/26/2014. Yes, after the well was shut in the IA pressure was at 1750 psi. The IA pressure has since been bled off. I have attached an updated TIO plot to show this. If at any time during the test the inner annulus pressure exceeds MOASP (2000 psi) the test will be terminated and the well shut in and IA pressure bled off. There will be constant monitoring of the inner annulus pressure during the testing period. Jack Disbrow BP Alaska-Well Integrity Coordinator ' Global wells Orclaniza;'o; Office: 907.659.5102 WIC Email:AKDCWellIntegrityCoordinator@bp.com From: Regg, James B (DOA) [mailto:jim.regg@alaska.gov] Sent: Friday, September 05, 2014 8:30 PM 1 To: AK, D&C Well Integrity Coordinator; Wallace, Chris D (DOA) Subject: RE: Permission to Produce Natural Flow Producer 18-11B (PTD #2131950) With Known Tubing x Inner Annulus Communication What pressure were you injecting gas? Is that the IA pressure that appears to be running about 2000 psi on TIO Plot? What criteria will trigger a shut down of your flow test if allowed? Jim Regg Supervisor, Inspections AOGCC 907-793-1236 Sent from Samsung Mobile Original message From: "AK, D&C Well Integrity Coordinator" <AKDCWellIntegrityCoordinator@bp.com> Date: 09/05/2014 4:46 PM (GMT-09:00) To: "Wallace, Chris D (DOA)" <chris.wallace@alaska.gov>,"Regg, James B (DOA)" <jim.regg@alaska.gov> Cc: "AK, D&C Well Integrity Coordinator" <AKDCWellIntegrityCoordinator@bp.com> Subject: Permission to Produce Natural Flow Producer 18-11B (PTD #2131950) With Known Tubing x Inner Annulus Communication Jim, Chris, Producer 18-11B (PTD#2131950)was recently sidetracked and underwent a rig workover to repair a production casing leak. The sidetrack and workover was completed on 07/08/2014. The well was placed online using gas from an adjacent well to provide artificial lift down the inner annulus of 18-11B, as no artificial lift gas is available on drill site 18. The gas lift was only to be used to kick the well off, then it would be discontinued once the well was flowing on its own. Shortly after the well was placed on production it failed a negative liner lap test on 08/25/2014, and the well was placed Under Evaluation. The gas lift valves were then pulled and were found to be flow cut. We suspect that the gas from the adjacent well used to provide artificial lift was wet and this caused the flow cutting of the valves. Dummy gas lift valves were then installed in stations#4 and #6 and a MIT-IA failed. A subsequent leak detection log found a leak in station #6 (upper most station) on 09/02/2014. We suspect the mandrel is flow cut also. A tubing tale plug was then set and a CMIT-TxIA passed to 3000 psi on 09/03/2014. BP would like permission from the AOGCC to flow the well without gas lift for a period of up to 14 days to determine if the well will flow on its own. If the well does flow without gas lift then a tubing patch will be set across station#6 to repair the tubing x inner annulus communication. If the well will not flow options such as patching station#6 and nitrogen lifting,gas lift redesign, or a rig workover will be evaluated. Copies of the TIO plot and wellbore schematic are attached for reference. 2 Please let me know if you need additional information. Thank you, Jack Disbrow BP Alaska -Well Integrity Coordinator Global\°ti`e;IS .' Orc aruaa lor. Office: 907.659.5102 WIC Email:AKDCWelIIntegrityCoordinator@bp.com 3 • • • • $ Go OO 1-A0000 A u3 • • v e € O .Q _O H O If) Q M r N '+ j *k D �° o 0 3 a a, 00 a� U o D O � CL os iv 8 • e O G O O en esi TREE= CIW H 4-1/16* 1AELLFEAD= Mc EVOY 1 8-1 1 B s.. _iy NOTES: WELL ANGLE>70°@ 9038'*** ACTUATOR= BAKER C MAX DLS:14.6°t 14064'. OKB.BEV= 56' I ! I BF. EI_EV= ? 1 KOP= -2674' I 1 2014' H4-1/2"HES X NP,ID=3.813" Max Angle= 98°©19174' 20'CONDUCTOR1-H ? 1 Datum AlD= N/A = 0' ZA 2524' —9-5/8'X 7"BKR HRD-E ZXPN LTP w/TIEBACK SLEEVE,ID=6,19" Datum TVD 880SS 13-3/8"CSG,72#,L-80 BTC,ID=12,347" — 2500' 11 2540' —19-5/8'X 7'FLEXLOCK Lrssz HG ID=6.22' 9-5/8"WriFSTOCK(05/13/14) H 2674' MLLOUT WINDOW(18-11B)2674'-2691' 9-5/8"CSG,47#,L-80 NSCC,ID=8.681" --I —2674' GAS LFT MANDRELS ST AU 1VD DEV TY FE VLV LATCH PORT DATE 6 2994 2991 12 KBG-2 DONE BK 16 07/14/14 Minimum ID = 3.725" @ 13001' 5 4638 4239 62 KBG-2 DMY BK 0 07/06/14 4-1/2" I LI HES XN NIPPLE 4 6363 5089 59 KBG-2 SO BK 20 07/14/14 3 7673 5753 60 KBG-2 DM' BK 0 07/06/14 2 8613 6204 65 KBG-2 DMY BK 0 07/06/14 TOP OF CEMENT(06/09/14) --I 12665' ... 4-1 .- 1 9013 6357 70 KBG-2 DMY BK 0 07/06/14 ,'')i. .4-• ..-• -4 I I : 12865' 1--14-1/2"HES X NIP,ID=3.813' • . ' -.• .4 4..'f. ..1. .1-1:11 ..i... .A.., 12895' —7"X 4-1/2"TNT FKR,ID=3.856' I I ', 12929' —14-1/2-I-IF_S X MP,0=3.813' .* A' *, • .17 13001* —14-1/2"HES XN NP,0=3.725" 4, .*1 13014' —7'X 5"BKR FIRDE ZXP LW w/TAO( I TOP OF 4-1/2"LNR — 13014' - - 1 SLEB/E,D=4.34" .;.* 't; . j.. 1 301 7' --[4-1/2"WLEG,10=3.883' 4-1/2"TBG, 12.6#,13CR-85 VAM TOP HC, H 13017' ---7"•4)----,..i' 4-'4 .0152 bpi,D=3.958" :* --I EL MD TT NOT LOGGED * *' ".c...*:* ..4 .. 13038' —17'X 5"BKR FLEXLOCK LNR HGR ID=4.31" k .k... 13048' ---15"X 4-1/2"X0 BUSHING,D=3.86" .. 7"LNR,26#,L-80 VA M TOP, —1 13446' .0377 bpi, ID=6.276" 4-A .* _ 13605' —6.125'OPEN HOLE SIDETRACK 4 PERFORATION SUWARY 443 RFF LOG :*.. 4,44 ANGLE AT TOP PERE:92"©172E30' -4, .-....; Note:Refer to Production DO for historical perf data ., SCE SPF INTERVAL Opn/Sqz SHOT SQZ —TD ,.4. 2-7/8" 6 17280-17630 0 07/04/14 .4,4,-, PLOT ..i., 2-7/8" 6 17850-18180 0 07/04/14 4.,. HOLE 2-7/8" 6 18230-18550 0 07/04/14 4-k• 4\ ',4 2-7/8" 6 18850-19000 0 07/04/14 15002 —4-1/2"FUP JOINT w/RA TAG IlsJ STOP RING 1'FROM PIN OE PUP JT ,*-• [ FBTD 4--19378' 16 71 3 4-1/2"'PUP JOINT w/RA TAG IN STOP RING -4 -• 4,4.44 '4:4.."'"k'Ar.;,*:4 1'FROM PIN OF PUP JT 4-1/2"LNR, 12.6#,13CR-85 VAM TOP, — 19491' .0152 bpf,ID=3.958" DATE REV BY COMENTS ' DATE REV BY COMMENTS FRUDI-DE BAY UNIT 09/17/84 RWN 41 IMTIAL COMPLETION 07/16/14 RCT/J/4) GLV 00(07/14/14) VVEIL: 18-11B 09/26/90 AU01 4 RWO PERIM No: 2131950 11/07/09 NORDIC1 CTD SIDETRACK(18-11A) API No: 50-029-21181-02 07108/14 P-272 CTD SIDETRACK(18-11B) SEC 19,711N,R15E, 1278'FKL&431'FWL 07/14/14 JAK) DRLG HO CORRECTIONS 07/16/14 JUJU) 'FINAL ODE AP .PROVAL BP Exploration(Alaska)k a) FA a 24t °‘5 BAKER PRINT DISTRIBUTION LIST HUGHES COMPANY BP Exploration Alaska Inc INTERMEDIATE FINAL Yes (mandatory) WELL NAME 18-11B RUN NUMBER DATA LOGGED 9/2/2014 (mandatory) M.K.BENDER FIELD Prudhoe Bay BH SALESMAN PAUL CANIZARES (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: July 15,2014 TODAYS DATE: 29-Aug (mandatory) DISTRIBUTION LIST AUTHORIZED BY: PAUL CANIZARES (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY CD FIELD FINAL (digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #OF PKIN I S #OF COPIES #OF COPIES 1 State of Alaska -AOGCC 1 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 2 RE_C uND AOGOC3 4 5 I 6 TOTALS FOR THIS PAGE: 0 1 1 0 0 0 TOTALS FOR ALL PAGES: 0 1 1 0 0 0 //t Z�1q� BAKER PRINT DISTRIBUTION LIST HUGHES COMPANY BP Exploration Alaska Inc INTERMEDIATE FINAL Yes (mandatory) WELL NAME 18-11B PB1 RUN NUMBER DATA LOGGEDR/2./201,11 (mandatory) M.K.BENDER FIELD Prudhoe Bay BH SALESMAN PAUL CANIZARES (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: July 15,2014 TODAYS DATE: 29-Aug (mandatory) DISTRIBUTION LIST AUTHORIZED BY: PAUL CANIZARES (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY CD (FIELD FINAL digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #OF F'I-tIN I S #OF COPIES #OF COPIES V 1 State of Alaska -AOGCC 1 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 2 RECEIVeD A L 3 AOGOO 4 • 5 1 6 I TOTALS FOR THIS PAGE: 0 1 1 0 0 0 TOTALS FOR ALL PAGES: 0 1 1 0 0 0 2-A3- vqb BAKER PRINT DISTRIBUTION LIST HUGHES COMPANY BP Exploration Alaska Inc INTERMEDIATE FINAL Yes (mandatory) WELL NAME 18-11B PB2 RUN NUMBER DATA LOGGED 9/2/2o1V (mandatory) M.K.BENDER FIELD Prudhoe Bay BH SALESMAN PAUL CANIZARES (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: July 15,2014 TODAYS DATE: 29-Aug (mandatory) DISTRIBUTION LIST AUTHORIZED BY: PAUL CANIZARES (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY CD (FIELD FINAL digital/ ADDRESS(FEDEXWILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #01 PKIN I S #OF COPIES #OF COPIES U U U U U 1 State of Alaska -AOGCC 1 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 2 AUG 24 2-0f4 3 s OGOC 4 5 6 TOTALS FOR THIS PAGE: 0 1 1 0 0 0 TOTALS FOR ALL PAGES: 0 1 1 0 0 0 2 - \q5 WI m -2-A-c,-1 R15 BAKER PRINT DISTRIBUTION LIST HUGHES COMPANY BP Exploration Alaska Inc INTERMEDIATE FINAL Yes (mandatory) WELL NAME 18-11B PB3 RUN NUMBER DATA LOGGED /2120144 (mandatory) M.K.BENDER FIELD Prudhoe Bay BH SALESMAN PAUL CANIZARES (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: July 15,2014 TODAYS DATE: 29-Aug (mandatory) DISTRIBUTION LIST AUTHORIZED BY: PAUL CANIZARES (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY CD (digital FINAL digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #OF I'KIN I S #OF COPIES #OF COPIES 1 State of Alaska -AOGCC 1 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 2 RECEIVED AUG 29 2014 3 AOGCC 4 5 6 TOTALS FOR THIS PAGE: 0 1 1 0 0 0 TOTALS FOR ALL PAGES: 0 1 1 0 0 0 213-\81 ,9 Hunt, Jennifer L (DOA) From: Lastufka, Joseph N [Joseph.Lastufka@bp.com] Sent: Thursday, August 14, 2014 2:00 PM To: Hunt, Jennifer L (DOA) Subject: PBU 18-011B/ PTD#213-195 Hi Steve, Please reference the following well: Well Name: PBU 18-11B Permit#: 213-195 API #: 50-029-21577-02-00 Date of Test: 8/10/2014 Type of Test: IPT (Initial Production Test) Choke Size: 128 Choke Unit: 64ths Production Method: Flowing Duration (Hours Tested): 8 Top Reference (Top Perf MD): 17280' Bottom Reference (Bottom Perf MD): 19000' Tubing Flowing (Pressure). 490 Casing Pressure: 1073 Total Test(Rate f/0, W, G): 930/ 1 /900 24-Hour Rate (0, W, G): 2789/4/2700 Gravity (Oil, API): 28.2 Deg GOR (Gas-Oil Ratio): 968 This well began Production on: 8/7/2014 Method of Operations on this date: Flowing 1 R$DMS AUG 18 104 - pE "' iED STATE OF ALASKA 41.11-1 0 7 2014 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO6O'GCC la. Well Status: • ®Oil ❑Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class 20AAC 25105 20AAC 25110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One • • 0 Development 0 Service 2. Operator Name: 5 Date Comp.,Susp.,or Aband: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 7/8/2014 213-195 • 314-230 3 Address. 6. Date Spudded' 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 5/16/2014 50-029-21181-02-00 ' 4a. Location of Well(Governmental Section): 7 Date T.D.Reached' 14. Well Name and Number. Surface: 6/29/2014 PBU 18-11B • 1278'FNL,431'FWL, Sec. 19,T11 N, R15E, UM • 8. KB(ft above MSL) 64.5' 15.Field/Pool(s) Top of Productive Horizon 1904' FSL, 3714' FEL, Sec. 12,T11 N, R14E, UM GL(ft above MSL): 17.4' Prudhoe Bay/Prudhoe Bay Total Depth' 9.Plug Back Depth(MD+TVD) 2222' FSL, 3376'FEL, Sec. 11,T11N, R14E, UM . 19378' 8641' . 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface. x- 692199 • y- 5960602• Zone- ASP4 • • 19493' 8625' • •ADL 028321,028302&028307 TPI. x- 687840 y- 5968956 Zone- ASP4 11 SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth.x- 682891 y- 5969152 Zone- ASP4 None 18. Directional Survey' ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(ND). (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21 Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD. MWD/GR/RES, USIT, MWD/GR/RES/NEU/DEN • 2674' 2674' . 23 CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT PER FT GRADE Top BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 110' Surface 110' 30" 1900#Poleset 13-3/8" 72# L-80 Surface 2500' Surface 2500' . 17-1/2" 2400 sx CS III,400 sx CS II 9-5/8" 47# L-80 Surface 2674' Surface 2674' _ 12-1/4" 1000 sx Class'G',300 sx CS II 7" 26# L-80 2524' 13446' 2524' 8201' 8-1/2" 244 sx Class'G', 144 sx Class'G' 4-1/2" 12.6# 13Cr85 13014' 19491' 7847' 8625' 6-1/8" 700 sx Class'G' 24. Open to production or injection? 0 Yes 0 No 25 TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) of Top&Bottom;Perforation Size and Number): 2-7/8"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr85 13017' 12895'/7753' alPLET1ON 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 17280'-17630' 8687'-8681' 14 17850'-18180' 8685'-8691' 18230'-18550' 8693' 8703' DEPTH INTERVAL(MD AMOUNT AND KIND OF MATERIAL USED 18850'-19000' 8692'-8684' WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No 2200' Freeze Protect w/138 Bbls Diesel 27 PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL. GAS-MCF. WATER-BBL. CHOKE SIZE' GAS-OIL RATIO' Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF' WATER-BBL' OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes 0 No • Sidewall Core(s)Acquired? 0 Yes 0 No , If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071 None R$CMS AUG 12 2014 Form 10-407 Revised 10/2012 CONTINUED ON REVERSE . • Submit Original Only viz_ 1/8/15-- 0 / . z ? ( , 1 )... C. 29. GEOLOGIC MARKERS(List all formations and ars encounter 30. FORMATION TESTS NAME TVD Well Tested? .es ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Ugnu 5772' 4790' West Sak 8402' 6109' None Colveville Mudstone 9697' 6558' HRZ 13082' 7903' Base of HRZ/Put River 13265' 8053' Base of Put River/LCU/Kingak 13337' 8112' Sag River 13443' 8199' Shublik A 13500' 8245' Shublik B 13525' 8264' Shublik C 13543' 8278' Sadlerochit-Zone 4 13572' 8299' CGL-Zone 3 13668' 8368' Base of CGL-Zone 2C 13751' 8427' 23SB-Zone 2B 13851' 8496' 22TS 13922' 8541' 21TS-Zone 2A 13962' 8565' Zone 1B 14139' 8641' TDF-Zone 1A 14388' 8672' Base of Sadlerochit-Kavik 16165' 8684' TDF-Zone 1A(Invert) 16318' 8683' Base of Sadlerochit-Kavik(Revert) 17070' 8691' TDF-Zone 1A(Invert) 17150' 8691' Base of Sadlerochit-Kavik(Revert) 18533' 8703' TDF-Zone 1A(Invert) 18868' 8691' Zone 1B 19155' 8671' 21TS-Zone 2A 19335' 8647' Formation at Total Depth: Zone 2A 19335' 8647' • 31.List of Attachment Summary of Daily Drilling Reports, LOT/FIT Summary,Well Schematic Diagram, Surveys, Cement Report 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact. Famil Mammadov,564-4135 Email: Famil.Mammadov@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist h / Signature: /I ' hone 564-4091 Date: IJV 1I'- INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells. Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8. The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex 50-029-20123-00-00) Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28 Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071 Form 10-407 Revised 10/2012 Submit Original Only TREE= aWH4-1/16" 8-1ANGLE>70° 9038' ACTUATOR= BAKER C 1 1 B MAX. 14.6°@ 14064'. "' OKE.ELEV= 56' I I Max Angle= 98' 19174' / ' 2014' —14-1/2"HES X NP,ID=3.813" n9@ 20-CONDUCTOR H Datum MD= WA Datum TVD= 8800'SS 2524' 19-5/8"X 7"BKR F RD•E ZXPN LW W/TEBA CK i SLEEVE,D=6.19" 13-3/8"CSG,72#,L-80 BTC,D=12.347" — 2500' J 2540' —9-5/8'X 7"FLEXLOCK LNR HGR,D=6.22" 9-5/8"WHPSTOCK(05/13/14) —1 2674' MLLOUT WINDOW(18-11B)2674'-2691' 9-5/8"CSG,47#,L-80 NSCC,ID=8.681" —H ^-2674' GAS LFT MAPDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE _ 6 2994 2991 12 KBG-2 DOME BK 16 07/14/14 Minimum ID = 3.725" @ 13001' 5 4638 4239 62 KBG-2 DMY BK 0 07/06/14 4-1/2" HES XN NIPPLE ( 4 6363 5089 59 KBG-2 SO BK 20 07/14/14 3 7673 5753 60 KBG-2 DMY BK 0 07/06/14 2 8613 6204 65 KBG-2 DMY BK 0 07/06/14 TOP OF CEMENT(06/09/14) H 12665 , 1 9013 6357 70 KBG-2 DMY BK 0 07/06/14 f 1A I 12865' —,4-1/2"HES X NP,D=3.813" ? P 1 t "`= 12895' H7"X 4-1/2"TNT PKR,D=3.856' i ►.t -i t� ' 12929'J-14-1/2"HES X,—,D=3.813" 13001' --I4-1/2"HES XN NP,D=3.725" ' *-* 0 13014' —7'X 5"BKR I-RD-EB ZXP LTP w!TIEBACK TOP OF 4-1/2"LN/2 — 13014. 4 SLEEVE,D=4.34" I 4-1/2"TBG,12.6#,13C R-86 VAM TOP HC, — 13017' �J It 13017' H4-1/2"WLEG,D=3.883' 0152 bpf,D=3.958" G(� —IaMD TT NOT LOGGED vi V4 • 13038' —7'X 5"BKR FLEXLOCK LNR HGR,13=4.31" tai---• 13048' —5"X 4-1/2"XO BUSHING,D=3 86" *7--**7 i i 7"LNR,26#,L-80 VAM TOP, --1 13446' '�� .0377 bpf,ID=6.276" f.* , ] 13605' H6.125"OPEN HOLE SIDETRACK y4 PERFORATION SUMMARY *4' �� Y.4 '► REF LOG: ?* t r. ANGLE AT TOP PERF:92°@ 17280' ,.4 Note:Refer to Production DB for historical perf data ':► SCE SPF INTERVAL Opn/Sqz SHOT SQZ '+ .-1 14466' —TD 2-7/8" 6 17280-17630 0 07/04/14 t i PLOT 2-7/8" 6 17850-18180 0 07/04/14 ` HOLE 2-7/8" 6 18230-18550 0 07/04/14 * ' 2-7/8" 6 18850-19000 0 07/04/14 15002 —{4-1/2'FUP JOINT w!RA TAG N STOP RING r; =, 1'FROM PN OF PUP JT PBTD 1-{ 19378' ' 16713 H 4-1/2'PUP JOINT w/RA TAG N STOP RING *4f •v i 1'FROM PN OF PUP JT 4-1/2"LNR, 12.6#,13CR-85 VAM TOP, — 19491' ," +�>j•� ~.4 -4,1..`a. .0152 bpf,ID=3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 09/17184 RWN 41 IMTIAL COMPLETION 07/16/14 RCT/JMD GLV C/O(07/14/14) WELL: 18-11B 09/26/90 AUDI 4 RWO FERMI No: 2131950 11/07109 NORDIC1 CTD SIDETRACK(18-11A) API No: 50-029-21181-02 07/08/14 P-272 CTD SIDETRACK(18-11B) SEC 19,T11 N,R15E, 1278'FM &431'FWL 07/14/14 JMD DRLG HO CORRECTIONS 07/16/14 JUJMD FNAL ODE APFROVAL BP Exploration(Alaska) BP AMERICA LOT / FIT Summary Well Name: 18-11B Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 05/15/14 LOT 2,713.00 2,712.80 10.10 290.00 1,713.34 12.17 06/11/14 FIT 13,468.00 8,209.00 8.60 518.00 4,185.40 9.81 Page 1 of 1 North America-ALASKA-BP Page 1 of 74 Operation Summary Report Common Well Name.18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/1/2014 12:00 - 18:00 6.00 RIGD P PRE BEGIN EVENT WITH PARKER RIG 272 AT 12:00 RIG DOWN MOVE OUT -PREP CUTTINGS BOX FOR MOVE -PREP DUMMY WELL HOUSE FOR MOVE -PREP BOP DECK AND PIPE BARN FOR RIG MOVE -BLOW DOWN AND RIG DOWN LINES -PREP ROOF TOPS TO SKID RIG FLOOR -CHANGEOUT DIES ON IRON DERRICKMAN GRABBER 18:00 - 00:00 6.00 RIGD P PRE RIG DOWN MOVE OUT -PJSM ON BRIDLE UP -CLEAN AND CLEAR RIG FLOOR -BRIDLE UP -PJSM ON SKIDDING -PREP RIG FLOOR -SKID FLOOR AND HAUNCH PREP TO LOWER DERRICK 5/2/2014 00:00 - 03:30 3.50 RIGD P PRE L/D DERRICK -PJSM -VERIFY DERRICK IS READY TO LAY OVER -SECURE TOP DRIVE SERVICE LOOP -LAY OVER MAST AND LEAVE 200 KLBS ON RACK -385 KLBS HOOKLOAD PRIOR TO LANDING ON RACK 03:30 - 06:00 2.50 MOB P PRE PULL UTILIITY MODULE OUT FROM DRILL MODULE -SET DOWN TURN TIRES -REINSTALL TIE RODS -PULL MUD MODULE OUT FROM DRILL MODULE -MOVE UTILITY MODULE T/18-11 06:00 - 07:30 1.50 MOB P PRE MOVE MUD MODULE T/18-11B NOTE:NOTIFIED AOGCC ABOUT UPCOMING BOP TEST AT 6:18 - AOGCC REPRESENTATIVE LOU GRIMALDI WAIVED TO WITNESS AT 6:37 07:30 - 09:00 1.50 MOB P PRE PULL DRILL MODULE OFF OF WELL 18-04D -REMOVE DUMMY WELL HOUSE W/CRANE& MOVE TO OTHER SIDE OF THE PAD 09:00 - 10:00 1.00 MOB P PRE MOVE DRILL MODULE T/18-11B -SPOT WELL HOUSE W/CRANE 10:00 - 11:00 1.00 MOB P PRE SPOT DRILL MODULE OVER 18-11B 11:00 - 12:00 1.00 MOB P PRE PREPARE TO MOVE MUD MODULE INTO POSITION PULL TIE RODS,AND TURN TIRES 12:00 - 14:00 2.00 MOB P PRE SPOT MUD MODULE AND UTILITY MODULE IN PLACE NEXT TO THE DRILL MODULE 14:00 - 17:00 3.00 RIGU P PRE RIG UP -CONNECT ALL ELECTRIC LINES IN INTERCONNECTS -DRESS OUT PIPE SHED -CONVERT ALL MODULES TO MAIN GENERATOR POWER Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 2 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 18:00 1.00 RIGU P PRE RAISE DERRICK -PJSM -WALK DOWN PRE CHECKLIST -RAISE DERRICK,522 KLBS TO LIFT DERRICK OFF HEADACHE RACK 18:00 - 21:00 3.00 RIGU P PRE RIG UP -SKID AND SET RIG FLOOR -MOVE AND SET HAUNCH -DRESS OUT RIG FLOOR -SPOT AND RIG UP CUTTINGS BOX -HOOK UP STEAM TABLE -INSTALL WALKWAYS ON ROOF TOP 21:00 - 00:00 3.00 RIGU P PRE RIG UP -BRIDLE DOWN AND CALIBRATE BLOCKS -DRESS OUT DERRICK -HOOK UP INTERCONNECTS,MUD, HYDRAULIC,WATER AND AIR LINES 5/3/2014 00:00 - 00:30 0.50 RIGU P PRE PERFORM RIG EVAC DRILL ACCEPT RIG AT 00:01 ON 5/3/14 00:30 - 02:00 1.50 RIGU P PRE ATTEMPT TO PURGE CHEMICAL INJECTION LINE W/10.3 PPG BRINE -USE TEST PUMP AND PRESSURE UP TO 2000 PSI TO PURGE CHEMICAL INJECTION LINE -LINE DID NOT TAKE FLUID,BLEED OFF ALL PRESSURE -RIG DOWN TEST PUMP F/CHEMICAL INJECTION LINE -SIMOPS: LOAD 5"DP IN PIPE BARN 02:00 - 04:00 2.00 RIGU P PRE R/U AND PERFORM ROLLING BPV TESTAS FOLLOWS(DUE TO PRODUCTION CASING LEAK) -LINEUP SECONDARY KILL ON IA -PUMP @.5 BPM, 46 PSI,INCREASE RATE UNTIL PRESSURE RESPONSE -CAUGHT PRESSURE @ 90 STROKES,9 BBLS -@ 2 BPM,105 PSI -@ 2.5 BPM,205 PSI -@ 3 BPM,275 PSI -@ 3.5 BPM,350 PSI -@ 4 BPM,425 PSI -@ 4.5 BPM,475-550 PSI -PUMPED A TOTAL OF 57 BBL -HELD PRESSURE FOR 5 MIN,TEST GOOD -NO PRESSURE BUILDUP SEEN ON TREE ABOVE BPV -TEST CHART ATTACHED Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 3 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-118©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 07:30 3.50 RIGU N SFAL PRE UNSUCCESSFULLY ATTEMPT TO NIPPLE DOWN FULL 7-1/16"CAMERON PRODUCTION TREE. -BLEED DOWN CONTROL LINE,INJECTION LINE AND HANGER VOID BARRIERS FOR NIPPLE DOWN: TESTED BPV -CONTINUOUSLY MONITORED 10.3 PPG KILL WEIGHT FLUID COLUMN USING CHARGE PUMP ON IA,-STATIC LOSS RATE:20 BBL/HR WHEN BREAKING TUBING HEAD ADAPTER FLANGE BPV BEGINS TO LEAK. RESET TREE. SHUT OFF CHARGE PUMP AND CONFIRM LEAK STOPS. 07:30 - 10:00 2.50 RIGU N WSEQ PRE TROUBLESHOOT LEAKING BPV: -NIPPLE UP TREE -PUMP DOWN THROUGH BPV TO CLEAN OUT SUSPECTED JUNK ON POPPET -RE-PERFORM ROLLING PRESSURE TEST FROM BELOW TO 500 PSI AT 4 BPM(PASS). PUMP TOTAL 43 BBLS. OBSERVE NO PRESSURE BUILDUP ABOVE BPV DURING TEST(BPV HOLDING). 10:00 - 14:00 4.00 RIGU P PRE NIPPLE DOWN FULL 7-1/16"CAMERON PRODUCTION TREE. -CLEAN HANGER NECK -CAMERON HAND VERIFY FUNCTION OF LOCK DOWN SCREWS -SEND TREE OUT OF BOP DECK -RUN TUBING HANGER X-OVER -INSTALL BLANKING PLUG WITH 11.5 TURNS TO THE LEFT -RETRIEVE TUBING HANGER X-OVER WITH 9.25 TURNS TO THE RIGHT BARRIERS FOR NIPPLE DOWN/NIPPLE UP: -TESTED BPV -CONTINUOUSLY MONITORED 10.3 PPG KILL WEIGHT FLUID COLUMN USING CHARGE PUMP ON IA -STATIC LOSS RATE=12 BBLS/HR 14:00 - 15:00 1.00 RIGU P PRE ATTEMPT TO PURGE CHEMICAL INJECTION LINE -PRESSURE UP ON CHEMICAL INJECTION LINE TO 4500 PSI -HELD PRESSURE,BUT DID NOT TAKE FLUID -CONSULT W/WELLS GROUP: LINE PURGED W/DIESEL 11/1990 Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 4 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-118 @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 21:00 6.00 RIGU P PRE NIPPLE UP HIGH PRESSURE RISERS AND BOPE -GREASE CHOKE MANIFOLD -CHECK PRE CHARGE ON ACCUMULATOR AND NITROGEN BOTTLES -INSTALL MOUSE HOLE AND MASTER BUSHING MAINTAIN CONTINUOUS HOLE FILL WITH CHARGE PUMP. STATIC LOSS RATE=12 BPH. NOTE: DURING NIPPLE UP OF RISERS, OBSERVE BPV BEGIN TO LEAK SHUT OFF CHARGE PUMP,BPV STOPS LEAKING. TURN HOLE FILL BACK ON AND BPV IS NOT LEAKING. RESUME NIPPLE UP. -SIMOPS: CHANGED OUT SAVER SUB TO 4.5"IF 21:00 - 00:00 3.00 BOPSUR P PRE R/U TO TEST BOP -RUN IN HOLE WITH TEST JOINT AND FILL SYSTEM LINE UP VALVES MAINTAIN CONTINUOUS HOLE FILL STATIC LOSSES 12 BBLS/HR 5/4/2014 00:00 - 01:00 1.00 BOPSUR N SFAL PRE UNSUCCESSFULLY ATTEMPT TO PERFORM SHELL TEST 01:00 - 02:00 1.00 BOPSUR N ' SFAL PRE CHANGE OUT ISOLATION VALVES AND BLEEDER VALVES ON TEST PUMP 02:00 - 08:00 6.00 BOPSUR N SFAL PRE CODE-8 IADC -TROUBLESHOOT AND REPAIR TEST PUMP NOTE: -OA=0 PSI,NO FLOW FROM OA @ 1:30 -BEGIN MONITORING OA PRESSURE EVERY 6 HRS 08:00 - 15:00 7.00 BOPSUR P PRE TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 3.5"AND 5"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -COMPLETE KOOMEY TEST -TEST WITNESS WAIVED BY AOGCC REP LOU GRIMALDI @ 6:15 5/2 -RIG DOWN AND LAY DOWN TEST JOINT -NO FAILURES -MAINTAIN CONTINUOUS HOLE FILL THROUGH IA,STATIC LOSS RATE=5-10 BPH 15:00 - 16:00 1.00 BOPSUR P PRE HOLD UNANNOUNCED H2S AND RIG EVAC DRILL DURING TEST WITH MR 16'00 - 17:00 1.00 BOPSUR P PRE COMPLETE BOPE TESTING TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 3.5"AND 5"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -COMPLETE KOOMEY TEST -TEST WITNESS WAIVED BY AOGCC REP LOU GRIMALDI @ 6:15 5/2 -RIG DOWN AND LAY DOWN TEST JOINT -NO FAILURES -MAINTAIN CONTINUOUS HOLE FILL THROUGH IA,STATIC LOSS RATE=5-10 BPH Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 5 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UW:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 17:30 0.50 BOPSUR P PRE RIG DOWN AFTER TESTING 17:30 - 18:00 0.50 BOPSUR P PRE SERVICE RIG 18:00 - 23:30 5.50 BOPSUR P PRE PULL BLANKING PLUG AND TYPE ISA BPV AS FOLLOWS: -CONFIRM WELL DEAD -RIG UP DUTCH RISER AND LUBRICATOR -PRESSURE TEST LUBRICATOR TO 250/3500 PSI,5MIN/5MIN -BREAK OFF LUBRICATOR AT QUICK TEST SUB AND SET BACK -RIH WITH JOINT OF DRILLPIPE AND PULL BLANKING PLUG. -RE-INSTALL LUBRICATOR TO DUTCH RISER AT QUICK TEST SUB -TEST QUICK TEST SUB TO 250/3500 PSI, 5MIN/5MIN(FIRST TWO ATTEMPTS FAILED, DUE TO DAMAGED 0-RINGS,REPLACE 0-RINGS AFTER EACH TEST,THIRD TEST: PASS) -RETRIEVE BPV • -RDMO LUBRICATOR AND VALVE SHOP CREW 23:30 - 00:00 0.50 WHSUR P DECOMP LINE UP TO REVERSE CIRCULATE -STATIC LOSSES:6 BBUHR LOSSES 5/5/2014 00:00 - 01:00 1.00 PULL P DECOMP CIRCULATE OUT FREEZE PROTECT -PUMP 50 BBL @ 4.5 BPM,1000 PSI OF 10.3 BRINE DOWN THE IA,NO RETURNS -CONSULT W/ODE ON PLAN FORWARD, DECISION WAS MADE TO PUMP DOWN TUBING -PUMP 70 BBLS DOWN 3.5"TUBING @ 5 BPM, 850 PSI,FULL RETURNS 01:00 - 02:00 1.00 PULL P DECOMP R/D AND BLOW DOWN CIRCULATING EQUIPMENT • -P/U AND M/U LANDING JT -BACK OUT LOCK DOWN SCREWS 02:00 - 02:30 0.50 PULL P DECOMP M/U LANDING JT TO TBG HANGER -P/U TBG HANGER 2' AND MONITOR WELL FOR 10 MIN:STATIC -PULL TBG HANGER TO FLOOR -148K INITIAL P/U WT TO UNSEAT HGR,116 FREE PULLING WEIGHT THROUGH STACK 02:30 - 03:30 1.00 PULL P DECOMP ! UD TBG HANGER SLB TERMINATE CONTROL LINE AND CHEMICAL INJECTION LINE -BREAK DOWN AND LAY DOWN LANDING JT AND TBG HANGER •-MONITOR WELL ON TRIP TANKS,STATIC •LOSS RATE:3 BBLS/HR 03:30 - 06:30 3.00 PULL P DECOMP R/U HEAD PIN ON 3.5"TBG AND CIRCULATE SURFACE TO SURFACE -PUMP 40 BBL SOAP SWEEP -5 BPM,690 PSI -DYNAMIC LOSS RATE:6 BBLS/HR SIMOPS: R/U DOYON CASING AND SLB SPOOLING !UNIT _ 06:30 - 07:00 0.50 PULL P DECOMP CHANGE OUT ELEVATORS Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 6 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 13:00 6.00 PULL P DECOMP UD 3.5"TUBING(TOTAL TUBING OUT OF j HOLE 113 JTS) -PULLED 7 STEEL BANDS -P/U 80K,S/O 78K 13:00 - 19:30 6.50 PULL P DECOMP WHILE PULLING OUT OF THE HOLE AT 6500' MD(113 JOINTS OUT),OBSERVE 3/8" STAINLESS STEEL CHEMICAL INJECTION LINE STARTING TO PULL TIGHT AND NOT SPOOLING WHILE PULLING TUBING. -P/U 82K,S/O 78K -DISCUSS PLAN FORWARD WITH ANCHORAGE TEAM -MAKEUP TO TUBING AND CIRCULATE AT 12 BPM,1850 PSI WHILE WAITING ON EQUIPMENT -CIRCULATE AROUND 40 BBLS OF EP MUD LUBE SWEEP. SPOT IN UPPER 650'OF HOLE. -RIG UP LINE TENSIONING EQUIPMENT (GUIDE LINE GRIPPERS)FROM CENTRAL POWER STATION TEAM. PULL 100'CHEMICAL INJECTION SLACK OUT OF HOLE. 19:30 - 00:00 4.50 PULL P DECOMP PULL TUBING WHILE PULLING CHEMICAL INJECTION LINE AT SAME TIME USING LINE TENSIONER SYSTEM TO 4495'MD AT MIDNIGHT. -P/U 74K,S/O 74K 5/6/2014 00:00 - 06:00 6.00 PULL P DECOMP UD 3.5"TUBING FROM 5526"MD TO 2100'MD. CONTINUE PULLING CHEMICAL INJECTION LINE AT SAME TIME AS TUBING USING LINE TENSIONER SYSTEM. -TUBING HOLE OBSERVED AT-7100'MD -P/U 59K,SO 59K 06.00 - 15.00 9.00 PULL N WAIT 2,100.00 DECOMP WHILE PULLING 3.5"TUBING WITH CHEMICAL INJECTION LINE OBSERVED FLUID LEAKING FROM INJECTION LINE. -CHEMICAL INJECTION LINE BEGIN TO LEAK WITH A MIST AND RELEASE OF LIQUID PRODUCT TO THE RIG FLOOR -FLUID DID NOT APPEAR TO BE DIESEL AS ORIGINALLY INDICATED BY RECORDS -7 EMPLOYEES WERE EXPOSED TO THE CONTENTS OF THE INJECTION LINE DURING INITIAL CONTAINMENT PHASE OF THE LEAK. -EXPOSED CREW MEMBERS WERE EVALUATED AT MCC CLINIC AND RELEASED FOR FULL DUTY -OBTAIN SAMPLE OF FLUID FROM CHEMICAL INJECTION LINE AND SENT TO GPB LAB FOR SUBSTANCE ANALYSIS -RECEIVED FLUID SAMPLE BACK FROM LAB AND IT WAS DETERMINED TO OBTAIN A MIXTURE OF DIESEL AND CORROSION INHIBITOR -DISCUSSED PLAN WITH RIG PERSONAL ON MOVING FORWARD AND THE HAZARDS ASSOCIATED WITH EXPOSURE TO CORROSION INHIBITOR -OUTFITTED RIG PERSONAL WITH PROPER PPE FOR HANDLING CORROSION INHIBITOR -MONITOR WELLBORE VIA TRIP TANK; STATIC LOSS 3 BBLS/HR Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 7 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 16:30 1.50 PULL P DECOMP UD 3.5"TUBING FROM 2100'MD TO 1700'MD. CONTINUE PULLING CHEMICAL INJECTION • LINE AT SAME TIME AS TUBING USING LINE TENSIONER SYSTEM. -TUBING HOLE OBSERVED AT-7100'MD P/U 36K,SO 36K 16:30 - 19:00 2.50 PULL P DECOMP STOP PULLING TUBING AND DECISION WAS MADE TO GO FORWARD WITH JUST PULLING THE CHEMICAL LINE OUT OF THE HOLE 19:00 - 19:30 0.50 PULL P DECOMP R/D SLB SPOOLING -CLEAN AND CLEAR RIG FLOOR OF EXCESS TOOLS AND EQUIPMENT 19:30 - 23:00 3.50 PULL P DECOMP L/D 3.5"TUBING FROM 1700"MD TO SURFACE • TUBING TOTAL WAS 319 JOINTS I ' -MISSING A TOTAL OF 32 CLAMPS,287 CLAMPS RECOVERED -OD.OF FLARE ON CUT JOINT WAS 4.25" L i , -CUT JOINT MEASURED 2.30' 23:00 - 00:00 1.00 PULL P ! DECOMP !RIG DOWN CASING EQUIPMENT I I-R/D TONGS AND SEND OUT TOOL CRANE - -R/U BX ELEVATORS W/ROTATOR -CLEAN AND CLEAR RIG FLOOR 5/7/2014 00:00 - 00:30 0.50 PULL P � DECOMP CLEAN AND CLEAR RIG FLOOR -CONTINUE TO SEND DOWN TOOLS 00:30 - 01:00 0.50 PULL •- P DECOMP SERVICE RIG 01:00 - 04:30 3.50 PULL N SFAL DECOMP ,DRAIN STACK TO SET WEAR RING -AFTER STACK WAS DRAINED IT WAS DISCOVERED THAT THERE WERE CHEMICAL INJECTION LINE CLAMPS IN THE CAVITY OF BOPE AND SEVERAL ON TOP OF WELLHEAD -CONTACTED ROTARY SUPERINTENDENT ON PLAN FORWARD TO OBTAIN MAGNET FROM BAKER FISHING SHOP -BEGIN TO M/U 8.5"CLEAN OUT BHA WHILE WAITING ON FISHING MAGNET TO ARRIVE ON LOCATION -TOTAL NUMBER OF CLAMPS RETRIEVED 10 04:30 - 05:00 0.50 WHSUR P DECOMP I INSTALL WEAR BUSHING ID=9.25" -FUNCTION BOPE 05:00 - 06:00 1.00 CLEAN P DECOMP PICK UP 8.5"CLEAN OUT BHA -P/U 6-6.5"DRILL COLLARS -P/U 12-5"HEAVY WEIGHT DRILL PIPE I 06:00 - 22:00 16.00 CLEAN P DECOMP SINGLE IN THE HOLE WITH 5"DP FROM SURFACE TO 10015'MD -TAG TUBING STUMP AT 10015'MD -FILL PIPE EVERY 20 STANDS -BREAK CIRCULATION EVERY 2,000'MD 'WITH 200 GPM AND 75 PSI -BRINE Wt'IN=10.3,BRINE WT OUT=10.3 -MONITOR WELL ON TRIP TANKS=HOLE GIVING PROPER DISPLACEMENT -PU 230K,SO 190K • CIRCULATE,ROTATE AND RECIPROCATE 3 TIMES 30'ON EITHER SIDE OF THE EZSV'S SETTING DEPTHS AT 2675'MD AND 9900'MD. -650 GPM,1700 PSI -40 RPM,4-7K TORQUE Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 8 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. ,UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 23:30 1.50 CLEAN P DECOMP CIRCULATE HOLE CLEAN -PUMP 40 BBL HIGH VIS SWEEP-NO INCREASE IN SOLIDS BACK AT SHAKERS -650 GPM,1700 PSI -DYNAMIC LOSS RATE=7 BBUHR 23:30 - 00:00 0.50 CLEAN P DECOMP TRIP OUT OF THE HOLE FROM 10015'MD TO 9519'MD -MONITOR WELL FOR 10 MIN BEFORE PULLING OFF BOTTOM=STATIC MONITOR WELL ON TRIP TANKS-HOLE TOOK PROPER FILL -BRINE WT IN=10.3,BRINE WT OUT=10.3 •-PU 230K,SO 190K 5/8/2014 00:00 - 04:30 4.50 CLEAN P DECOMP TRIP OUT OF THE HOLE FROM 9519'MD TO 600'MD '-MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA INTO BOP STACK=STATIC -MONITOR WELL ON TRIP TANKS-HOLE 'TOOK PROPER FILL -BRINE WT IN=10.3,BRINE WT OUT=10.3 04:30 - 06:00 1.50 CLEAN P DECOMP PULL OUT OF THE HOLE FROM 601'MD TO SURFACE LAY DOWN BAKER CLEANOUT ASSY. -MONITOR WELL ON TRIP TANKS-HOLE TOOK PROPER FILL BRINE WT IN=10.3,BRINE WT OUT=10.3 06:00 - 06:30 0.50 CLEAN P DECOMP I CLEAN RIG FLOOR -LUBRICATE RIG -CLEAN OFF RIG FLOOR 06:30 - 10:30 4.00 ZONISO P DECOMP M/U BHA&RIH WITH EZSV HOLD PJSM ON PICKING UP AND RUNNING EZSV -RIH T/2,570'MD©150 FPM -FILL PIPE EVERY 20 STANDS -P/U=81K,S/O=86K 10:30 - 11:00 0.50 ZONISO N RREP 2,570.00 DECOMP CODE 8: REPAIR ST-80 -CHANGE HOSE ON ST-80 11:00 - 16:30 5.50 ZONISO P DECOMP 'RIH WITH EZSV -RIH F/2,570'MD T/9,900'MD @ 150 FPM -BREAK CIRCULATION EVERY 2,000'@ 2 BPM,65 PSI -P/U=205K,S/O=178 K 16:30 - 17:30 1.00 i ZONISO P DECOMP SET EZSV @ 9,900'MD -CIRCULATE&WASH THROUGH SETTING DEPTH ROTATE 35 TURNS TO THE RIGHT -PULLED 50K OVER T/255K&SHEAR F/EZSV 1-SET 15K DOWN ON EZSV TO ENSURE A PROPER SET 17:30 - 19.00 1.50 ZONISO P DECOMP CIRCULATE BU 1-420 GPM©650 PSI 19:00 - 00:00 5.00 ZONISO N RREP 9,900.00 DECOMP 1CODE 8 IADC '-DRAWWORKS SHUTTING DOWN INTERMITTENTLY -TROUBLESHOOT DRAWWORKS ENCODER FIBER OPTICS CABLE -CIRCULATE WHILE TROUBLESHOOTING -450 GPM,650 PSI I-MAINTAIN BRINE WT AT 10.3 PPG IN,10.3 PPG OUT Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 9 of 74 Operation Summary Report Common Well Name: 18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) i Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64.50usft(above Mean Sea Level) Date From-To • Hrs 1 Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 5/9/2014 00:00 - 00:00 24.00 ZONISO N RREP 9,900.00 DECOMP CODE 8 IADC -TROUBLESHOOT DRAVWVORKS ENCODER !FIBER OPTICS CABLE !-CIRCULATE WHILE TROUBLESHOOTING 1-450 GPM,650 SIMOPS: -HOLD PJSM,BUILD 39 STANDS OF 5"DRILL PIPE -CLEAN UP AND STRAIGHTEN UP RIG -PERFORM PREVENTATIVE MAINTENANCE ON ROTARY TABLE -REARRANGING STORAGE AREAS 5/10/2014 100:00 - 12:30 12.50 ZONISO N RREP 9,900.00 DECOMP CODE 8 IADC -TROUBLESHOOT DRAWWORKS ENCODER FIBER OPTICS CABLE 1-CIRCULATE WHILE TROUBLESHOOTING -126 GPM,120 PSI i j SIMOPS: I I CLEAN UP AND STRAIGHTEN UP RIG I-PERFORM PREVENTATIVE MAINTENANCE ON ST-80,MANUAL MASTER BUSHINGS,MUD PUMPS,GENERATORS,AND IDM. -BUILD STORAGE LOCKERS FOR PIPE BARN 12:30 - 13:30 1.00 ZONISO N RREP 9,900.00 DECOMP FUNCTION TEST DRAWWORKS -MONITOR WELL FOR 10 MIN=STATIC -CALIBRATE BLOCKS AND CHECK CROWN-O-MATIC -TEST DRAWWORKS WITOUT PIPE IN ELEVATORS -PULL 5 STANDS OF DP OUT OF THE HOLE AND RUN THEM BACK IN THE HOLE WITH NO ISSUES. 13:30 - 14:30 1.00 ZONISO P i DECOMP RIG UP TO PUMP CEMENT -PJSM WITH SLB,RIG CREWAND CH2; DISCUSS PRESSURE CROSSCHECK LIST AND COVER ALL ITEMS WITHIN IT -RIG UP FOSV AND HEAD PIN ON TOP OF DRILLSTRING -CONNECT CEMENT LINE 1-FLUID PACK AND PRESSURE TEST !CEMENTING EQUIPMENT TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH. Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 10 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date. X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 16:00 1.50 ZONISO P DECOMP PUMP BALANCED CEMENT PLUG AS FOLLOWS: -FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOWAND 3500 PSI HIGH FOR 5 MINUTES EACH -PUMP 51.81 BBLS OF 12 PPG MUDPUSH II SPACER @ 5 BPM,200 PSI PUMP 79.38 BBLS OF 15.8 PPG CLASS G TAIL©5 BPM,(YIELD 1.16 CU.FT/SK) -PUMP 17.65 BBLS OF 12 PPG MUDPUSH II SPACER©5 BPM,200 PSI -DROP DRILL PIPE WIPER DART PERFORM DISPLACEMENT WITH SLB CEMENTERS 113.4 BBLS DISPLACED AT 5 BPM:ICP 83 PSI 10%RETURN FLOW,FCP 264 PSI 7%RETURN FLOW -8.1 BBLS DISPLACED AT 2 BPM:ICP 37 PSI 4%RETURN FLOW,FCP 37 PSI 4%RETURN FLOW -DISPLACEMENT FLUID:121.5 BBLS OF 10.3 PPG BRINE -CEMENT IN PLACE(CIP)©16:10 ON 05/10/2014 NO LOSSES DURING CEMENT JOB 16:00 - 17:30 1.50 ZONISO P DECOMP PULL OUT OF THE HOLE AT 30 FT/MIN FROM 9900'MD TO 8400'MD -RIG DOWN CEMENT EQUIPMENT AND HEAD PIN -PIPE PULLED DRY WITH NO SWABBING NOTED AT SURFACE 17:30 - 19:00 1.50 ZONISO P DECOMP CIRCULATE OUT EXCESS CEMENT AND MUD PUSH -DROP WIPER BALL AND PUMP NUT PLUG SWEEP,PUMP FULL CIRCULATION -DROP SECOND WIPER BALL AND PUMP OUT OF DRILLSTRING -420 GPM,700 PSI --4 BBLS(5%)OF CONTAMINATED CEMENT AND-35 BBL OF MUD PUSH TO SURFACE ON BOTTOMS UP -100%RETURNS OBSERVED WHILE CIRCULATING -ESTIMATED TOP OF CEMENT 8870'MD 19:00 - 00:00 5.00 ZONISO P DECOMP PULL OUT OF THE HOLE FROM 8400'MD TO SURFACE -MONITOR WELL FOR 10 MIN PRIOR TO PULLING=STATIC -BRINE WT:10.3 PPG IN,10.3 PPG OUT -LAY DOWN EZSV RUNNING TOOL TOTAL LOSSES FOR DAY=18 BBLS 5/11/2014 00:00 - 00:30 0.50 ZONISO P DECOMP LAY DOWN EZSV RUNNING TOOL -CHANGE OUT INSERTS IN ELEVATORS AND PS-21 SLIPS 00:30 - 04:30 4.00 ZONISO P DECOMP PICK UP RTTS AND RIH TO 7500'MD -MONITOR WELL ON TRIP TANKS;PROPER DISPLACEMENT OBSERVED -BRINE WT IN=10.3 PPG BRINE WT OUT= 10.3 PPG Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 11 of 74 Operation Summary Report Common Well Name: 18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: IX3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ! Description of Operations (hr) (usft) 04:30 - 06:00 j 1.50 ZONISO P DECOMP 1SET RTTS AND PRESSURE TEST CEMENT !PLUG TO 250 PSI LOW 5 MINUTES/2750 PSI HIGH FOR 30 MINUTES -TEST FAILED(NO RETURNS C©SURFACE) 06:00 - 07:00 1.00 ZONISO P DECOMP TIH F/7,500'MD T/7,985'MD -CIRCULATE PIPE CAPACITY AT 60 SPM&180 i PSI 07:00 - 08:00 1.00 ZONISO P DECOMP PRESSURE TEST CEMENT PLUG TO 250 PSI LOW 5 MINUTES/2750 PSI HIGH FOR 30 MINUTES ' -TEST FAILED(GOT RETURNS(4)SURFACE) 08:00 - 08:30 0.50 ZONISO P DECOMP TIH F/7,985'MD T/8,300'MD 08:30 - 09:00 0.50 ZONISO P DECOMP PRESSURE TEST CEMENT PLUG TO 250 PSI LOW 5 MINUTES/2750 PSI HIGH FOR 30 MINUTES — -TEST FAILED 09:00 - 09:30 0.50 ZONISO P DECOMP POOH F/8,300'MD T/7,500'MD 09:30 - 10:00 0.50 ZONISO P . DECOMP PRESSURE TEST CEMENT PLUG TO 250 PSI LOW 5 MINUTES/2750 PSI HIGH FOR 30 MINUTES -TEST FAILED 10:00 - 10.30 0.50 ZONISO P DECOMP TIH F/7,500'MD T/8,465'MD -P/U=180K,S/0=160K -WASH FROM 8272'MD TO 8,465'MD @ 2.5 BPM,50 PSI -PRESSURE INCREASED TO 1050 PSI -BLEED OFF PRESSURE AND PULL OUT OF !CEMENT -CAME BACK DOWN AND TAGGED AT THE SAME DEPTH 10:30 - 12:30 2.00 ZONISO i P DECOMP PRESSURE TEST CEMENT PLUG @ 8,461'MD I TO 250 PSI LOW 5 MINUTES/2750 PSI HIGH !FOR 30 MINUTES '-TEST FAILED RACK BACK 1 STAND --PRESSURE TEST CEMENT PLUG TO 250 PSI LOW 5 MINUTES/2750 PSI HIGH FOR 30 MINUTES -TEST FAILED 12:30 - 17:00 4.50 ZONISO P DECOMP POOH ON ELEVATORS F/8,461'MD T/ SURFACE MONITORED WELL FOR 10 MIN:STATIC -MW IN=10.3,MW OUT=10.3 -P/U=181K,S/O=160K @ 8,461'MD 17:00 - 17:30 0.50 ZONISO P DECOMP UD RTTS TOOL -CLEAN TOOL&CHECK FOR DAMAGES -UPPER SEAL SHOWING INDICATION OF WEAR,NO RIPS OR GOUGES. -BOTTOM SEAL LOOKED GOOD Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 12 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.5ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 20:00 2.50 ZONISO P DECOMP CHANGE OUT RAMS ON BOP -MONITOR WELL FOR 10 MIN:STATIC -DRAIN STACK -CHANGE TOP PIPE RAMS F/2-7/8"X 5-1/2" VBR'S T/4-1/2"X 7 VBR'S -MONITOR WELL BY KEEPING HOLE FULL THRUOUGH MUD CROSS,WITH BLIND RAMS CLOSED,WHILE CHANGING TOP PIPE RAMS -M/U TEST JOINT,PULL WEAR RING,SET TEST PLUG -FILL STACK AND LINES HOOK UP SECONDARY KILL LINE TO IAAND FILL WITH CHARGE PUMP 20:00 - 20:30 0.50 ZONISO P DECOMP TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 5"AND 7"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WAIVED BY AOGCC REP JEFF JONES TEST#2 FAILED DUE TO TEST PUMP 20:30 - 22:30 2.00 ZONISO N RREP DECOMP CODE 8 -TROUBLESHOOT TEST PUMP -CHANGE OUT CHART RECORDER -CHANGE OUT SENSATOR -PURGE LINE BETWEEN CHART RECORDER AND SENSATOR 22:30 - 00:00 1.50 ZONISO P DECOMP TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 5"AND 7"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WAIVED BY AOGCC REP JEFF JONES -0 BOPE TEST FAILURES -KEEP HOLE FULL DURING TEST,LOSSES AT 2 BBLS PER HOUR 5/12/2014 00:00 - 04:00 4.00 ZONISO P DECOMP TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 5"AND 7"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WAIVED BY AOGCC REP JEFF JONES -0 BOPE TEST FAILURES -KEEP HOLE FULL DURING TEST,LOSSES AT 2 BBLS PER HOUR 04:00 - 05:00 1.00 ZONISO P DECOMP RIG DOWN BOPE TEST -PULL TEST PLUG -LAY DOWN TEST JOINT -INSTALL WEAR BUSHING 05:00 - 05:30 0.50 ZONISO P DECOMP SERVICE RIG 05:30 - 08:30 3.00 ZONISO N RREP 8,461.00 DECOMP CODE 8 RIG REPAIR -REPAIR ELECTRICAL CONTROL SYSTEM ON IRON DERRICK MAN -REPAIR/REPLACE CABLE/WIRING 08:30 - 13:30 5.00 ZONISO P 8,461.00 DECOMP M/U RTTS&RIH -HOLD PJSM ON P/U RTTS -P/U M/U RTTS -TIH T/8,303'MD -P/U=175K,S/0=160K Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 13 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Dateffime:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 15:00 1.50 ZONISO P 8,461.00 DECOMP PRESSURE TEST CEMENT PLUG -HOLD PJSM ON PRESSURE TESTING -SET RTTS:2 TURNS TO THE RIGHT AND SET DOWN 30K -SET @ 8,303'MD -PRESSURE TEST 250 PSI LOW(PASS),2,750 PSI HIGH 30 MIN(FAIL) 15:00 - 15:30 0.50 ZONISO P 8,461.00 DECOMP RIH F/8,303'MD T/8456'MD -UNSET RTTS AND RIH 15:30 - 16:30 1.00 ZONISO P 8,461.00 DECOMP PRESSURE TEST CEMENT PLUG -SET RTTS:2 TURNS TO THE RIGHT AND SET , DOWN 30K -SET @ 8,456'MD , -PRESSURE TEST 250 PSI LOW(PASS),2,750 PSI HIGH 30 MIN(FAIL) 16:30 - 21:00 4.50 1 ZONISO P 8,461.00 DECOMP CIRCULATE AND CONDITION MUD 1 i -340 GPM @ 240 PSI -CIRCULATE OUT LIGHT SPOTS -WEIGHT UPAS NEEDED 21:00 - 00:00 3.00 ZONISO P 8,461.00 DECOMP POOH WITH RTTS -FLOW CHECK WELL(STATIC) I-POOH ON ELEVATORS F/8,456'MD T/2,958' H MW IN=10.3 PPG,MW OUT=10.3 PPG -AT 8,456'UP WT=180K,DN WT=161K -AT 2,958'UP WT=100K,DN WT=100K 5/13/2014 00:00 - 01:00 1.00 ZONISO P , 8,461.00 DECOMP SET RTTS AT 2,959'MD -TEST 9 5/8"CASING FROM SURFACE TO I 2,959'MD,250 PSI LOW FOR 5 MINUTES AND 3500 PSI HIGH FOR 15 MINUTES -NO DAMAGE TO ELEMENT OBSERVED UPON INSPECTION 01:00 - 02:30 1.50 ZONISO P 8,461.00 ; DECOMP POOH WITH RTTS FROM 2,959'TO SURFACE -UPWT=92K,DN WT=95KAT 2,959' -MW IN=10.3 PPG,MW OUT=10.3 PPG -L/D RTTS 02:30 - 03:30 1.00 WHIP P WEXIT RIG UP SCHLUMBERGER E-LINE 03:30 - 05:30 2.00 WHIP P WEXIT I RIH WITH SCHLUMBERGER ELINE -PJSM WITH RIG CREW,SCHLUMBERGER AND BP I RUN JUNK BASKET AND 8-1/2"GAUGE RING TO 3500'MD -- I-LAY DOWN GAUGE RING AND JUNK BASKET 05:30 - 08:00 2.50 WHIP P WEXIT RIH WITH EZSV ON SCHLUMBERGER E-LINE I-PICKUP EZSV WITH GR,CCL AND I CORRELATE I-RIHT/2,696'MD 08:00 - 10:00 2.00 WHIP N WAIT WEXIT WAIT ON APPROVAL FROM TOWN TO SET EZSV I-RECEIVE DEVIATION AND AUTHORIZATION TO PROCEED 10:00 - 11:00 1.00 WHIP P WEXIT I CORRELATE EZSV,SET AND TEST I -SET EZSV CO 2,696'MD -TEST EZSV 250 LOW(PASS)AND 3500 HIGH (PASS) RECEIVE AUTHORIZATION TO PROCEED I FROM WTL JIM WILLINGHAM -RIG DOWN E-LINE 11:00 12:00 1.00 WHIP P WEXIT SLIP&CUT -CUT 85'OF DRILL LINE Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 14 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447.096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B @64.50usft(above Mean Sea Level) Date From-To Hrs • Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 12:30 0.50 WHIP P WEXIT CALIBRATE BLOCK HEIGHT -M/U SHEAR JOINT OFFLINE ••12:30 - 16:30 4.00 I WHIP P WEXIT P/U WHIPSTOCK/MILLING ASSEMBLY -STAGE WHIPSTOCK AND MILLING ASSEMBLY 1-CHANGE OUT PS-21 POWER SLIPS TO MANUEL SLIPS -HOLD PJSM FOR PICKING UP BHA M/U MILLING ASSEMBLY P/U WHIPSTOCK AND CONFIRM PROPER SHEAR SCREWS IN PLACE 16:30 - 17:30 1.00 WHIP P WEXIT RIH WITH 9-5/8"WHIPSTOCK/MILLING ASSEMBLY RIH T/2,696'MD ON ELEVATORS RIH @ 1 MIN/STAND -P/U=111K,S/O=108K 17:30 - 20:00 1 2.50 WHIP P WEXIT R/U AND RUN WIRELINE -HOLD PJSM ON RIGGING UP AND RUNNING WIRELINE R/U WIRELINE SHEAVES -RUN GYRO DATA R/D VNRELINE SHEAVES 20:00 - 20:30 0.50 WHIP P WEXIT RIH F/2,632'MD T/2,696'MD AND SET I WHIPSTOCK I-ORIENT WHIPSTOCK TO 276 DEG. • • -RIH AND TAGGED EZSV @ 2,696'MD -SET W/8K DOWN AND SHEARED OFF W/ 31K DOWN •-TOW @ 2,674'MD,BOW @ 2,691'MD 20:30 - 21:00 0.50 WHIP P WEXIT •DISPLACE 10.3 BRINE WITH 10.1 LSND MILLING FLUID -420 GPM,640 PSI -70 BBLS OF HI-VIS SPACER FOLLOWED BY LSND MILLING FLUID 21:00 - 21:30 0.50 WHIP P WEXIT POOH ON ELEVATORS F/2,674'MDT/2,519' MD MONITOR WELL FOR 10 MIN:STATIC -MW IN=10.1 PPG,MW OUT=10.1 PPG PU=109K,SO=109K @ 2,674 MD 21:30 - 22:30 1.00 WHIP P WEXIT I P/U AND M/U STORM PACKER -RIH 1 STAND AND SET WITH 1/4 TURN TO I THE RIGHT -SET DOWN STRING WEIGHT I-TURN TO THE LEFT 20 TIMES TO RELEASE FROM STORM PACKER 1-PULL BACK 1 STAND AND L/D PUP 22:30 - 23:30 1.00 WHIP P WEXIT TEST STORM PACKER -LINE UP KILL LINE AND FILL LINES -TEST 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES EACH -BLOW DOWN LINES -RECEIVE AUTHORIZATION TO PROCEED FROM WTL JIM WILLINGHAM 23:30 - 00:00 0.50 BOPSUR P WEXIT NIPPLE DOWN STACK -RIG UP AND DRAIN BOP STACK -MAKE UP WEAR RING PULLING TOOL 5/14/2014 00:00 - 00:30 0.50 BOPSUR P WEXIT ,PULL WEAR BUSHING Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 15 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 03:30 3.00 BOPSUR P WEXIT NIPPLE DOWN BOP STACK -NIPPLE DOWN BELL NIPPLE AND BOP STACK -RIG UP AND PULL PACKOFF FROM WELLHEAD. -PACKOFF SPLIT WHILE PULLING. -FISH LOWER RING AND STUDS FROM PACKOFF OUT OF WELLHEAD. SIMOPS:CLEANING OUT PITS AND BUILDING SWEEPS FOR MILLING WINDOW. 03:30 - 05:00 1.50 WHSUR P DECOMP INSTALL NEW 9-5/8"PACKOFF AND ENERGIZE SEALS. 05:00 - 08:00 3.00 WHSUR P DECOMP TEST PACKOFF -ENERGIZE LOWER PACKOFF WITH PLASTIC -RIG UP AND TEST 9-5/8"PACKOFF -TEST TO 250 PSI LOW FOR 5 MINUTES/ 3500 PSI HIGH FOR 30 MINUTES. -INSTALL NEW TUBING SPOOL 08:00 - 09:30 1.50 BOPSUR P WEXIT NIPPLE UP BOP -INSTALL BELL NIPPLE AND TURN BUCKLES 09:30 - 10:00 0.50 BOPSUR P WEXIT TEST BREAKS ON BOP'S -TEST 250 HIGH,3500 LOW 5 MINUTES EACH -0 FAILURES 10:00 - 11:00 1.00 STWHIP P WEXIT PREP FLOOR -INSTALL WEAR BUSHING -M/U SAFETY JOINT -CLEAN RIG FLOOR 11:00 - 12:30 1.50 STWHIP P WEXIT RETRIEVE AND UD RTTS -PICK UP 1 STAND AND PUP JOINT -TURN 21 TURNS TO THE RIGHT POOH WITH RTTS AND UD 12:30 - 22:30 10.00 STWHIP P WEXIT MILL 8-1/2"WINDOW F/2,674"MDT/2,713'MD -450 GPM,600 PSI ON,600 PSI OFF -80 RPM,2-8K TORQUE,1K TORQUE OFF -WOB 2-6K -P/U=106K,S/O=109K,ROT=106K -INDICATIONS OF SOME CEMENT BEHIND CASING. -MW IN=10.1 PPG,MW OUT=10.1 PPG -PUMP 20 BBLS OF HI-VIS SWEEP @ 2,682' MD -SPR'S:2,674'MD(2,674'TVD),MW=10.1 PPG #1 MP-20/30 SPM=125/150 PSI #2 MP-23/30 SPM=120/150 PSI 22:30 - 23:00 0.50 STWHIP P WEXIT BACK REAM THROUGH WINDOW -100 RPM,450 GPM -DRIFT WINDOW WITH AND WITHOUT PUMPS -1-2K DRAG,2,685'-2,688'MIDDLE OF THE WINDOW NOTED ON EVERY PASS. 23:00 - 00:00 1.00 STWHIP P WEXIT RIG UP TO PERFORM LOT LAY DOWN SINGLE 5/15/2014 00:00 - 00:30 0.50 STWHIP P WEXIT PERFORM LOT -MUD WEIGHT 10.1 PPG AT 2,674'TVD,2,674 MD -PUMP 8.5 BBLS, 2 BBLS BLED BACK -290 PSI;LOT EMW=12.17 PPG -DISCUSSED LOT RESULTS WITH ODE Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 16 of 74 Operation Summary Report Common Well Name: 18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B @64.5ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 02:30 2.00 STWHIP P WEXIT POOH -MONITOR WELL FOR 10 MINUTES;STATIC -MW IN=10.1 PPG,MW OUT=10.1 PPG -POOH ON ELEVATORS FROM 2,764'TO SURFACE -UP WT=106K,DN WT=111K AT 2,600' 02:30 - 04:00 1.50 STWHIP P WEXIT LAY DOWN BHA -MONITOR WELL FOR 10 MINUTES -LAY DOWN COLLARS -LAY DOWN MILLING BHA -INSPECT MILLS -STARTER MILL 3/16"OUT OF GAUGE ALL AROUND -UPPER 8.5"WATERMELON MILL DAMAGED. -LOWER 3"OF BLADES STRIPPED OF CARBIDE AND OD=7.75" -UPPER 5"OF BLADES IN GAUGE AND NOT DAMAGED. -FLUSH OUT STACK AND BLOW DOWN LINES. -CALL ODE AND FISHING SUPERVISOR TO DISCUSS MILL DAMAGE AND DRAG NOTED IN MIDDLE OF SLIDE. -DECISION MADE TO PICK UP A 8.5" TANDEM UPPER MILLING ASSEMBLY AND CLEAN UP WINDOW. 04:00 - 05:00 1.00 STWHIP N DPRB 2,713.00 WEXIT BAKER MOBILIZING SECOND 8.5"UPPER WATERMELON MILL FROM SHOP IN DEADHORSE. -MAKE UP COLLARS AND WEIGHT PIPE AND STAND BACK IN DERRICK. 05:00 - 06:00 1.00 STWHIP N DPRB 2,713.00 WEXIT PICK UP AND MAKE UP 8.5"MILLING ASSEMBLY WITH TANDEM 8.5"UPPER WATERMELON MILLS. -PJSM WITH RIG CREW. -PICK UP AND MAKE UP MILLS. 06:00 - 07:30 1.50 STWHIP N DPRB 2,713.00 WEXIT RUN IN THE HOLE WITH 8-1/2"MILLING ASSEMBLY 07:30 - 10:30 3.00 STWHIP N DPRB 2,713.00 WEXIT MILL OUT WINDOW -450 GPM.600 PSI -80 RPM,1K TORQUE -P/U=103K,S/O=106K,ROT=106K @ 2,700' MD 10:30 - 13:00 2.50 STWHIP N DPRB 2,713.00 WEXIT CIRCULATE AND CONDITION MUD -PUMP HI-VIS SWEEP -450 GPM,600 PSI -P/U=103K,S/O=106K 13:00 - 14:30 1.50 STWHIP N DPRB 2,713.00 WEXIT POOH ON ELEVATORS F/2,713'MD T/616'MD -MONITOR WELL FOR 10 MIN:STATIC -MW IN=10.1 PPG,MW OUT=10.1 PPG P/U=103K,S/O=106K @ 2,713'MD 14:30 - 15:30 1.00 STWHIP N DPRB 2,713.00 WEXIT LAY DOWN 8-1/2"MILLING ASSEMBLY -STAND BACK HWDP IN DERRICK -R/U AND FLUSH OUT STACK FUNCTION BOP'S 15:30 - 17:00 1.50 DRILL P WEXIT P/U 8-1/2"INTERMEDIATE DRILLING ASSEMBLY -HOLD PJSM ON PICKING UP BHA Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 17 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 20:00 3.00 DRILL N HMAN WEXIT CODE 8 -REPLACE CABLE ON PIPE CAT -0 INJURIES -TAIL ROPE WAS CAUGHT IN THE CABLES ON THE PIPE CAT -CABLE CAME OFF SHEAVES AND WAS DAMAGED -TOOK DAMAGED CABLES OFF PIPE CAT AND REPLACED WITH NEW. -NOTIFIED NS SUPERINTENDENT AND BOTH PARKER HSE AND SAFETY. -TRACTION REPORT INITIATED 2014-IR-4717338 20:00 - 20 30 0.50 DRILL P WEXIT SERVICE RIG SERVICE TOP DRIVE AND DRAWWORKS 20:30 - 00:00 3.50 DRILL P WEXIT PICK UP 8-1/2"DRILLING BHA -PJSM WITH RIG TEAM -SHIM MOTOR FROM 1.3°TO 1.1° -MAKE UP BIT AND SCRIBE MOTOR AND MWD PLUG INTO MWD AND DOWNLOAD 5/16/2014 00:00 - 00:30 0.50 DRILL P WEXIT RIH WITH 8.5"DRILLING BHA FROM SURFACE' TO 640' -UP WT=60K,DN WT=60KAT640' -SHALLOW HOLE TEST MWD 400 GPM 00:30 - 01:30 1.00 DRILL P WEXIT RIH FROM 640'TO 2,632' -MW IN=10.1 PPG,MW OUT=10.1 PPG -UP WT=95K,DN WT=95K 01:30 - 03:30 2.00 DRILL P WEXIT CIRCULATE AND CONDITION MUD FOR BASELINE ECD READINGS -550 GPM,1,430 PSI -MW IN=10.1 PPG,MW OUT=10.1 PPG -THIN MILLING FLUID YP TO DRILLING PARAMETER SPECS. -YP=23. -OBSERVED CLEAN HOLE ECD 10.96 PPG SIMOPS-RIG UP GYRO AND WIRE LINE 03:30 - 06:00 2.50 DRILL P WEXIT GYRO ORIENT FOR WINDOW 300° -RUN IN THE HOLE WITH GYRO. -NOT ABLE TO GET A CONSISTENT TOOL FACE. -PULL OUT OF THE HOLE AND CHECK TATTLE-TALE. -VERIFY TOOL AND CHANGE CENTRALIZERS ON GYRO TOOL. -RUN IN THE HOLE WITH GYRO. 06:00 - 06:30 0.50 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 2,713'MD T/2,726'MD(2,726'TVD) -425 GPM,950 PSI ON,925 PSI OFF -P/U=107K,S/0=108K -WOB=2K -CALCULATED ECD=10.93 PPG 06:30 - 07:30 1.00 DRILL P INTI ORIENT AND SURVEY WITH GYRO EVERY 30' -GYRO T/2,726'MD 07:30 - 09:30 2.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 2,726'MD T/2,817'MD(2,817'TVD) -450 GPM,1040 PSI ON,1030 PSI OFF -P/U=107K,S/O=108K,ROT=107K -WOB=5K CALCULATED ECD=10.94 PPG Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 18 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 � End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date ' From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 10:00 0.50 DRILL P INTI ORIENT AND SURVEY WITH GYRO EVERY 30' -GYRO T/2,817"MD 10:00 - 11:30 1.50 DRILL P INTI 'DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 2,817'MDT/2,913'MD(2,912'TVD) -450 GPM,1050 PSI ON,1040 PSI OFF -P/U=110K,5/0=110K,ROT=110K -70 RPM,2K TORQUE ON,1K TORQUE OFF WOB=5K -CALCULATED ECD=10.92 PPG -ACTUAL ROTATE TIME=.4 HRS -ACTUAL SLIDE TIME=2.4 HRS JAR HOURS=2.8 HRS MW IN=10.1 PPG,MW OUT=10.1 PPG i SPR'S:2,670'MD(2,670'TVD),MW=10.1 PPG -#1 MP-20/30 SPM=170/215 PSI -#2 MP-20/30 SPM=165/215 PSI 11:30 - 12:30 1.00 DRILL I P INTI r,ORIENT AND SURVEY WITH GYRO EVERY 30' GYRO T/2,913"MD 12:30 - 13:30 1.00 DRILL _P j INTI 1 DRILUSLIDE 8-1/2"INTERMEDIATE HOLE I i j I SECTION F/2,913'MDT/3,009'MD(3,007' I ND) -450 GPM,1330 PSI ON,1280 PSI OFF -P/U=110K,S/O=110K,ROT=110K -70 RPM,1-2K TORQUE ON,1K TORQUE OFF -WOB=5-10K -ACTUAL ECD=11.05 PPG,CALCULATED ECD=10.98 PPG -4- -MW IN=10.1 PPG,MW OUT=10.1 PPG 13:30 - 14:00 0.50 DRILL P INTI I ORIENT AND SURVEY WITH GYRO EVERY 30' -GYRO T/3,009"MD 14:00 - 15:30 1.50 DRILL P INTI DRILL/SLIDE 8-1/2"INTERMEDIATE HOLE 1 SECTION F/3,009'MD T/3,103'MD(3,100' TVD) -525 GPM,1440 PSI ON,1360 PSI OFF -P/U=111K,S/O=110K,ROT=110K 70 RPM,1-3K TORQUE ON,1-2K TORQUE I ,OFF 1 i ,-WOB=3-7K '-ACTUAL ECD=11.0 PPG,CALCULATED ECD =10.98PPG 1 '-MW IN=10.1 PPG,MW OUT=10.1 PPG 15:30 - 16:00 0.50 DRILL P INTI ORIENT AND SURVEY WITH GYRO EVERY30' ' -GYRO T/3,103"MD ;16:00 - 17:00 1.00 DRILL P • INTI DRILL/SLIDE 8-1/2"INTERMEDIATE HOLE I ' SECTION F/3,103'MDT/3,199'MD(3,197' TVD) -550 GPM,1680 PSI ON,1520 PSI OFF -P/U=116K,S/0=113K,ROT=111K -70 RPM,1-3K TORQUE ON,1K TORQUE OFF -WOB=5-10K -ACTUAL ECD=11.07 PPG,CALCULATED 1ECD=11.0 PPG -MW IN=10.1 PPG,MW OUT=10.1 PPG 1 17:00 - 18-00 1.00 DRILL P I IINTI 1 ORIENTANDSURVEY WITH GYRO EVERY 30' -GYRO T/3,103"MD -R/D E-LINE AND GYRO TOOLS Printed 7/21/2014 10:22:41AM l North America-ALASKA-BP Page 19 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 23:30 5.50 DRILL P INTI DRILL 8-112"INTERMEDIATE HOLE SECTION F/ 3,199'MD T/3,627'MD(3,575'TVD) -550 GPM,1600 PSI ON,1520 PSI OFF -P/U=126K,5/0=118K,ROT=117K -70 RPM,1-3K TORQUE ON,1-2K TORQUE OFF -WOB=3-8K -MW IN=10.1 PPG,MW OUT=10.1 PPG -ACTUAL ECD=11.04 PPG,CALCULATED ECD=11.01 PPG -BACKREAM 90'BEFORE EVERY CONNECTION -SURVEY EVERY 30' -PUMP 20 BBL SWEEP AT 3,627' -75%INCREASE IN CUTTINGS OBSERVED -ACTUAL ROTATE TIME=2.4 HRS -ACTUAL SLIDE TIME=2.9 HRS -JAR HOURS=8.1 HRS SPR'S:3,300'MD(3,283'TVD),MW=10.1 PPG #1 MP-20/30 SPM=155/200 PSI -#2 MP-20/30 SPM=145/195 PSI 23:30 - 00:00 0.50 DRILL P INTI LUBRICATE RIG SERVICE TOP DRIVE AND DRAVVWORKS -CHANGE OUT SWAB ON PUMP#1 5/17/2014 00:00 - 07:30 7.50 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 3,627'MD T/4,150'MD(3,959'TVD) -550 GPM,1730 PSI ON,1650 PSI OFF -P/U=132K,S/O=122K,ROT=123K -70 RPM,3-4K TORQUE ON,2-3K TORQUE OFF WOB=6-10K -MW IN=10.1 PPG,MW OUT=10.1 PPG -ACTUAL ECD=11.02 PPG,CALCULATED ECD=10.9 PPG -BACKREAM 90'BEFORE EVERY CONNECTION -SURVEY EVERY 30' -PUMP 20 BBL SWEEP AT 3,900' -ACTUAL ROTATE TIME=1.7 HRS -ACTUAL SLIDE TIME=2.2 HRS -JAR TIME=12.0 HRS SPR'S:4,055'MD(3,890'TVD),MW=10.1 PPG -#1 MP-20/30 SPM=175/223 PSI #2 MP-20/30 SPM=175/223 PSI 07:30 - 08:00 0.50 DRILL P INTI CIRCULATE OUT SWEEP -APPROXIMATELY 40%INCREASE IN CUTTINGS OBSERVED -CBU X 1 @ 550 GPM,1600 PSI -P/U=132K,S/0=122K -75 RPM,3K TORQUE -PUMP SLUG Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 20 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UVN:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs ! Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 11:00 3.00 DRILL j P INTI POOH ON ELEVATORS F/4,150'MDT/2,630' MD -MONITOR WELL 10 MIN BEFORE PULLING ( I OFF BOTTOM(STATIC) P/U=132K,S/O=122K @ 4,100'MD MWIN=10.1,MW OUT=10.1 -PULLED 10K OVER @ 2,995'MD -PUMPED 450 GPM @ 385 PSI WITH 30 RPM @ 110K TORQUE -WORK THROUGH TIGHT SPOT 11:00 - 11:30 0.50 DRILL P INTI CBU X 1.5 -550 GPM 1470 PSI -CIRCULATE HI-VIS SWEEP WITH NUT PLUG 11:30 - 13:00 1.50 DRILL P INTI POOH ON ELEVATORS F/2,630'MDT/639'MD MONITOR WELL 10 MIN(STATIC) P/U=108K,S/O=104K,ROT=106K @ 1,778' MD = MWIN=tat MW OUT=10.1 13:00 15:00 2.00 DRILL P INTI L/D 6.3/4"MOTOR AND MILL TOOTH BIT -MONITOR WELL FOR 10 MIN(STATIC) -HOLD PJSM ON HANDLING BHA !-L/D 6-3/4"MOTOR AND MILL TOOTH BIT 15:00 - 18:00 3.00 DRILL P I INTI P/U RSS AND PDC BIT -HOLD PJSM ON HANDLING BHA -M/U ONTRAK BHA F/SURFACE T/631'MD -PLUG IN AND DOWNLOAD TOOL -P/U DC AND HWDP FROM DERRICK 18:00 - 21:30 3.50 DRILL P INTI RIH WITH 8.5"RSS DRILLING BHA F/631'MD T/4,042'MD _RIH ON STANDS OF 5"DP FROM THE DERRICK BREAK CIRCULATION EVERY 2,000'MD @ 400 GPM,790 PSI -P/U=100K,S/O=100K @ 2,674'MD -TOOK 7K WEIGHT AT WINDOW M/U TOP DRIVE AND WASH DOWN THROUGH THE WINDOW TO 3015'. -NO OTHER ISSUES NOTED. 21:30 - 23:00 1.50 DRILL P INTI 1.SURVEY LAST 100'FROM 4,042'TO 4,150' -500 GPM,1400 PSI,60 RPM,200'/HOUR Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 21 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 4,150'MD T/4,212'MD(4,009'TVD) -420 GPM,1050 PSI ON,1050 PSI OFF -P/U=133K,S/0=124K,ROT=126K 120 RPM,4-5K TORQUE ON,3-4K TORQUE OFF -WOB=8K -MW IN=10.1 PPG,MW OUT=10.1 PPG -ACTUAL ECD=10.90 PPG,CALCULATED ECD=11.00 PPG -BACKREAM 30'BEFORE EVERY CONNECTION -SURVEY EVERY 30' -ACTUAL ROTATE TIME=.6 HRS -ACTUAL SLIDE TIME=0 HRS -JAR TIME=12.6 HRS KICK WHILE DRILLING DRILL AND AAR: -UNANNOUNCED COMPLEX DRILL WITH AD ON THE BRAKE. -INDUCED FLOW DOWN FLOWLINE WITH HOLE FILL PUMP. -AD NOTICED FLOW INCREASE AND PERFORMED FLOW CHECK. -RIG CREW RESPONDED TO DRILL APPROPRIATELY. -AAR WITH CREW AFTER. -DISCUSSED BRIDGING DOCUMENTS -LOWER LOT AND KICK TOLERANCE ON 18-11 B. -DISCUSSED STANDING ORDERS. -HANDOVERS AND COMMUNICATION WITH RELIEF. j -ROLES AND RESPONSIBILITIES. SPR'S:4,150'MD(3,959'TVD),MW=10.1 PPG -#1 MP-20/30 SPM=130/190 PSI -#2 MP-20/30 SPM=135/185 PSI 5/18/2014 00:00 - 06:00 6.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 4,212'MD T/4,610'MD(4,231'TVD) -550 GPM,1730 PSI ON,1600 PSI OFF -P/U=140K,S/O=122K, ROT=126K -140 RPM,6K TORQUE ON,3K TORQUE OFF -WOB=12K -MW IN=10.1 PPG,MW OUT=10.1 PPG -ACTUAL ECD=11.07 PPG,CALCULATED ECD=11.02 PPG -BACKREAM 90'BEFORE EVERY CONNECTION -SURVEY EVERY 30'PER PLAN, MULTI-STATION CORRECTION. -PUMP 20 BBL HI-VIS SWEEP W/NUT PLUG EVERY 150'/200' SPR'S:4,610'MD(4,227'TVD),MW=10.1 PPG -#1 MP-20/30 SPM=152/205 PSI -#2 MP-20/30 SPM=155/200 PSI Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 22 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay ; Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64 50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 4,610'MD T/5,260'MD(4,535'TVD) -550 GPM,1775 PSI ON,1700 PSI OFF -P/U=136K,S/O=118K,ROT=128K -140 RPM,7K TORQUE ON,3K TORQUE OFF -WOB=10K -MW IN=10.1 PPG,MW OUT=10.1 PPG ACTUAL ECD=11.09 PPG -BACKREAM 20'BEFORE EVERY CONNECTION -SURVEY EVERY 90'PER PLAN, i MULTI-STATION CORRECTION. -ACTUAL ROTATE TIME=7.1 HRS -JAR TIME=22.5 HRS SPR'S:4,610'MD(4,227'ND),MW=10.1 PPG -#1 MP-20/30 SPM=165/220 PSI #2 MP-20/30 SPM=165/215 PSI 12:00 - 18:00 6.00 DRILL P INTI ,DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 5,260'MD T/5,800'MD(4,750'ND) 550 GPM,1900 PSI ON,1870 PSI OFF '-P/U=153K,S/O=129K,ROT=127K 140 RPM,7K TORQUE ON,4K TORQUE OFF -WOB=10-14K -MW IN=10.1 PPG,MW OUT=10.1+PPG •-ACTUAL ECD=11.4 PPG 1-BACKREAM 20'BEFORE EVERY CONNECTION 1-SURVEY EVERY 90'PER PLAN, MULTI-STATION CORRECTION. -ACTUAL ROTATE TIME=4.5 HRS -JAR TIME=23.6 HRS SPR'S:5,652'MD(4,732'ND),MW=10.1 PPG -#1 MP-20/30 SPM=200/255 PSI -#2 MP-20/30 SPM=195/250 PSI ----------- 18:00 - 00:00 6.00 i DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 5,800'MD T/6,363'MD(5,084'ND) -550 GPM,1950 PSI ON,1930 PSI OFF -P/U=167K,S/O=135K,ROT=135K • -140 RPM,7-9K TORQUE ON,4-5K TORQUE OFF -WOB=10-14K MW IN=10.1 PPG,MW OUT=10.1 PPG 1-ACTUAL ECD=11.4 PPG -BACKREAM 40'BEFORE EVERY CONNECTION -SURVEY EVERY 90'PER PLAN, MULTI-STATION CORRECTION. -ACTUAL ROTATE TIME=3.2 HRS • -JAR TIME=26.8 HRS SPR'S:6,230'MD(5,017'ND),MW=10.1 PPG -#1 MP-20/30 SPM=200/260 PSI -#2 MP-20/30 SPM=195/250 PSI Printed 7/21/2014 10.22:41AM North America-ALASKA-BP Page 23 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM 'Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/19/2014 00:00 - 04:00 4.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE SECTION F/ 6363'MD T/6674'MD(5239'TVD) -550 GPM,1950 PSI ON,1940 PSI OFF -Pill=163K,S/O=129K,ROT=142K -150 RPM,10K TORQUE ON,6K TORQUE OFF WOB=10K MW IN=10.1 PPG,MW OUT=10.1 PPG !-ACTUAL ECD=11.33 PPG;CALC ECD=10.93 'PPG -BACKREAM 40'BEFORE EVERY CONNECTION !-SURVEY EVERY 90'PER PLAN, MULTI-STATION CORRECTION. SPR'S:6674'MD(5239'TVD),MW=10.1 PPG #1 MP-20/30 SPM=190/245 PSI -#2 MP-20/30 SPM=190/240 PSI 04:00 - 06:00 2.00 i DRILL N DPRB 6,674.00 INTI 1 ENCOUNTERED'ERRATIC TORQUE AND ROP I FELL OFF AT 6673'MD TROUBLESHOOT AND ATTEMPT TO IDENTIFY ISSUES. TORQUE 4K TO 13K AND VERY ERRATIC. I-ROP WENT FROM 200 FPH TO LESS THAN 40 FPH. •-PICKED UP OFF BOTTOM. '-TOOK SURVEY AND NO MAGNETIC I INTERFERENCE NOTED. -SOME METAL SHAVINGS NOTED AT SURFACE. MONITOR WELL FOR 10 MIN.-STATIC. CALLED NS SUPERINTENDENT AND ODE. DISCUSS PARAMETERS AND DIRECTIONAL CONTROL. 06:00 - 15:00 9.00 DRILL N DPRB 6,674.00 INTI POOH ON ELEVATORS F/6,674'MD T/6,220 MD MONITOR WELL FOR 10 MIN BEFORE PULLING OFF BOTTOM(STATIC) -P/U=180K,S/O=136K @ 6,673'MD -MW IN=10.1 PPG,MW OUT=10.1 I PUMP/BACK REAM OUT OF THE HOLE F/ 6,220'MD T/2,623' -450 GPM,1100 PSI @ 6,200'MD -70 RPM,3K TORQUE,118K ROTATING I WEIGHT -BACK REAM @ 25 FT/HR -MONITOR WELL FOR 15 MIN(LOSING 1 BBUHR STATIC) 15 00 - 16 00 1.00 DRILL N DPRB 6,674.00 INTI CIRCULATE BOTTOMS UP -550 GPM,1400 PSI -120 RPM,2K TORQUE -PUMPED HI-VIS SWEEP WITH 20% INCREASE IN CUTTINGS -2 BBUHR DYNAMIC LOSSES -MONITOR WELL 10 MIN(STATIC) Printed 7/21/2014 102241AM North America-ALASKA-BP Page 24 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 18:30 2.50 DRILL N DPRB 6,674.00 INTI POOH ON ELEVATORS/2,623'MD T/631'MD -MWIN=10.1 PPG,MW OUT=10.1 PPG -P/U=163K,@ 2,623'MD -MONITOR WELL 10 MIN(STATIC) -POOH F/631'MD T/SURFACE -P/U=65K @ 631'MD -STAND BACK COLLARS. -BIT GRADE 1-1-NO-A-X-I-NO-HP -NO DAMAGE OR ABNORMAL WEAR TO BIT. 18:30 - 19:00 0.50 DRILL N DPRB 6,674.00 INTI DOWN LINK FROM MWD TOOL BEFORE STANDING BACK. 19:00 - 20:00 1.00 DRILL N DPRB 6,674.00 INTI SERVICE TOP DRIVE AND DRAWWORKS. CLEAN AND CLEAR RIG FLOOR. 20:00 - 22:00 2.00 DRILL N DPRB 6,674.00 INTI MAKEUP AND RUN IN HOLE WITH MULE SHOE ON 1040'4"XT-39 DP TO USE AS CEMENT STINGER. CROSSOVER AND RUN IN HOLE WITH CEMENT STINGER ON 5"DP FROM DERRICK TO WINDOW AT 2466'MD 22:00 - 00:00 2.00 DRILL N DPRB 6,674.00 INTI MONITOR WELL AT WINDOW WHILE LRS KILLS L2-21A PRIOR TO RUNNING GYRO(AS PART OF POSSIBLE WELL COLLISION INVESTIGATION). -STATIC LOSSES=1 BPH. 5/20/2014 00:00 - 01:00 1.00 DRILL N DPRB 6,674.00 INTI CONTINUE TO MONITOR WELL AT WINDOW WHILE INVESTIGATING POSSIBLE WELL COLLISION WITH L2-21A. -STATIC LOSSES=1 BPH -REGULARLY CHECK SURFACE PRESSURES ON SURROUNDING WELLS. NO SIGNS OF PRESSURE COMMUNICATION ON ANY WELLS,INCLUDING L2-21A. -LITTLE RED SERVICES KILLING L2-21A IN PREPARATION FOR GYRO SURVEY TO CONFIRM DOWNHOLE POSITION(GYRO SURVEY LATER CONFIRMED L2-21A MOVED 6' SHALLOWER ON TVD,28'SOUTH,2'WEST AND WAS STILL 180'CENTER TO CENTER FROM 18-11B). 01:00 - 04:00 3.00 DRILL N DPRB 6,674.00 INTI RUN IN THE HOLE WITH 1000'4"DP CEMENT STINGER ON 5"DRILL PIPE FROM DERRICK. -FROM WINDOW AT 2466'MD TO 6650'MD. -P/U=141K,S/O=127K @ 6,630'MD -COMBO D-1 KICK WHILE TRIPPING DRILL AND FIRE DRILL AND AAR WITH RIG CREW. 04:00 - 12:00 8.00 DRILL N DPRB 6,674.00 INTI STAGE UP PUMPS AND CIRCULATE WELL CLEAN. -RECIPROCATING 75'AND ROTATING AT 40 RPM. -336 GPM,500 -WAITING FOR CEMENT TRUCKS AND CREWS TO BECOME AVAILABLE FOR BALANCED PLUG CONTINUE TO MONITOR WELLAND RIG UP TO PUMP CEMENT -CIRCULATE 170 GPM AT 260 PSI -RERUN CEMENT FIELD BLEND TO INCREASE PUMP TIME 12:00 - 13:00 1.00 DRILL N DPRB 6,674.00 INTI PJSM ON CEMENT JOB -BATCH CEMENT AND MUD PUSH Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 25 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 14:30 1.50 DRILL N DPRB 6,674.00 INTI PUMP BALANCED PLUG AS FOLLOWS: -FILL LINES WITH MUD PUSH AND PRESSURE TEST TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MINUTES -PUMP 59.4 BBLS OF 12 PPG MUD PUSH II SPACER @ 5 BPM,60 PSI -PUMP 54.2 BBLS OF 16.5 PPG,360 SX,TAIL SLURRY @ 5 BPM,200 PSI -PUMP 21 BBLS OF 12 PPG MUD PUSH II @ 5 BPM,60 PSI SLB DISPLACE 10.1 PPG LSND,65 BBLS AT 5 BPM:ICP-480 PSI,FCP-220 PSI -CEMENT IN PLACE AT 14:30 -TIME TO REACH 2000 PSI COMPRESSIVE STRENGTH=19:40 HRS. 14:30 - 15:30 1.00 DRILL N DPRB 6,674.00 INTI POOH ON ELEVATORS FROM 6,664'TO 5,788' -MW IN=10.1 PPG,MW OUT=10.1 PPG -PUW=145KAT6,500' -PULL AT 3 MINUTES/STAND,PULL DRY 15:30 - 16:30 1.00 DRILL N DPRB 6,674.00 INTI DROP WIPER BALL AND CHASE WITH NUT PLUG SWEEP -500 GPM,1000 PSI -70 RPM,3K TORQUE -DUMP MUD PUSH RETURNS TO CUTTINGS TANK -NO CEMENT BACK TO SURFACE 16:30 - 17:00 0.50 DRILL N DPRB 6,674.00 INTI DROP 2ND WIPER BALL AND CHASE WITH NUT PLUG SWEEP -500 GPM,1000 PSI 70 RPM,3K TORQUE 17:00 - 21:00 4.00 DRILL N DPRB 6,674.00 INTI POOH ON ELEVATORS FROM 5,788'TO SURFACE -MONITOR WELL ON BOTTOM,AT WINDOW: STATIC -MW IN=10.1 PPG,MW OUT=10.1 PPG -PUW=135KAT 5,500' 21:00 - 00:00 3.00 DRILL N DPRB 6,674.00 INTI CLEAN AND CLEAR RIG FLOOR -SERVICE TOP DRIVE AND DRAWWORKS -INSPECT DERRICK -SERVICE FLOOR CRANE AND RIG FLOOR EQUIPMENT -EMAILED AOGCC REQUEST TO TEST BOPE. AOGCC INSPECTOR JOHNNIE HILL RESPONDED AND INDICATED HE WOULD BE ON LOCATION AT 06:00 HRS TO WITNESS THE TEST. 5/21/2014 00:00 - 04:00 4.00 BOPSUR N DPRB 6,674.00 INTI R/U TO TEST BOPE -PULL WEAR BUSHING -RIH W/TEST JOINT AND FILL SYSTEM -SET TEST PLUG -LINE UP VALVES -PERFORM SHELL TEST 04:00 - 06:00 2.00 BOPSUR N DPRB 6,674.00 INTI MONITOR WELLAND WAIT FOR AOGCC REP TO COMMENCE BOPE TESTING Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 26 of 74 Operation Summary Report Common Well Name: 18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B( 64.50usft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 13:00 7.00 BOPSUR P INTI BOPE TEST TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 7",5"AND 4"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS I-NO FAILURES NOTED. TEST WITNESSED BY AOGCC REP JOHN HILL 13:00 - 14:00 1.00 BOPSUR P INTI RIG DOWN BOPE TEST PULL TEST PLUG -BREAK DOWN AND LAY DOWN TEST JOINT :-INSTALL WEAR RING -CLEAN AND CLEAR.RIG FLOOR 14:00 - 15:30 1.50 STKOH N DPRB 6,674.00 INTI PICK UP 8-1/2"DRILLING BHAAND RIH TO 613' -UPLOAD TO MWD TOOLS -BHAWT65K 15:30 19:30 4.00 STKOH N DPRB 6,674.00 INTI RIH WITH 8-1/2"DRILLING BHA FROM 613'TO 5,833' RIH ON ELEVATORS PICKING UP 5"DP STANDS FROM DERRICK BREAK CIRCULATION EVERY 2,000' j-400 GPM,950 PSI PUW=160K,SOW=130K AT 5,750' MW IN=10.1 PPG,MW OUT=10.1 PPG 19:30 - 20:30 1.00 STKOH N DPRB 6,674.00 INTI CIRCULATE BOTTOMS UP 2.5 TIMES -550 GPM,1800 PSI -70 RPM,4K TORQUE -SIGNIFICANT QUANTITY OF COAL JUST BEFORE BOTTOMS UP. -COAL CLEANED UP 100 BBLS AFTER BOTTOMS UP. -PH INCREASED TO 12 AND SEVERAL BBLS OF GREEN CEMENT NOTED 120 BBLS AFTER BOTTOMS UP. -CONTINUED TO CIRCULATE UNTIL HOLE CLEANED UP. -OBSERVED ECD=10.95 PPG 20:30 - 00:00 3.50 STKOH N DPRB 6,674.00 INTI TAG CEMENT STRINGERS AT 5,833'TO 5,845' -DRILL CEMENT FROM 5,845'TO 5,890'. -NOTIFY ODE OF SHALLOW TAG ON TOP OF CEMENT. -EXPECTED TOC 600'-6250'MD. -550 GPM,1900 PSI ON,1850 PSI OFF -140 RPM,5-7K TQ ON,5K TQ OFF PUW=160K,SOW=130K,ROT=135K -WOB 2-5K -MW IN=10.1 PPG,MW OUT=10.1 PPG SPR'S:5,850'MD(4,828'TVD),MW=10.1 PPG ,-#1 MP-20/30 SPM=220/280 PSI 1-#2 MP-20/30 SPM=214/275 PSI Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 27 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292118100 Active datum:18-116©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/22/2014 00:00 - 02:00 2.00 STKOH N DPRB 6,674.00 INTI CONTINUE TO DRILL CEMENT FROM 5890'TO 6036'MD -550 GPM,1900 PSI ON,1850 PSI OFF -100-140 RPM,5-7K TQ ON,5K TQ OFF -PUW=160K,SOW=130K,ROT=135K WOB 2-5K -MW IN=10.1 PPG,MW OUT=10.1 PPG -ECD:CALC=10.85. -SURVEY EVERY-90'. SPR'S:6036'MD(4922'TVD)MW=10.1 PPG. !#1 MP-20/30 SPM=155/225 PSI #2 MP-20/30 SPM=155/220 PSI 02:00 - 05:00 3.00 STKOH N DPRB 6,674.00 INTI SIDETRACK OFF CEMENT PLUG FROM 6036' MD TO 6135'MD(4967'TVD) -550 GPM, 1880 PSI ON,1860 PSI OFF -100-140 RPM,10K TORQUE ON,6K TORQUE OFF -PU 160K,SO 129K,ROT 136K -ECD:ACTUAL=11.12 PPG,CALC=10.87 PPG -MUD WEIGHT:10.1 PPG IN,10.1 PPG OUT 05:00 - 10:45 5.75 DRILL N DPRB 6,674.00 INTI ,DRILL 8.5"INTERMEDIATE HOLE FROM 6135' •MD TO 6674'MD 550 GPM, 1900 PSI ON,1850 PSI OFF -100-140 RPM,10K TORQUE ON,6K TORQUE OFF -PU 160K,SO 129K,ROT 136K -ECD:ACTUAL=11.10 PPG,CALC=10.87 PPG -SURVEY EVERY-90 FT -MUD WEIGHT:10.1 PPG IN,10.1PPG OUT SPR'S:6606'MD(5214'TVD)MW=10.1 PPG. #1 MP-20/30 SPM=220/280 PSI #2 MP-20/30 SPM=215/280 PSI 10:45 - 12:00 1.25 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 6674' MD TO 6799'MD(5313'TVD) -550 GPM, 2010 PSI ON,1975 PSI OFF -100-140 RPM,8K TORQUE ON,7K TORQUE OFF -PU 167K,SO 132K,ROT 140K -WOB=5K -ECD:ACTUAL=11.10 PPG,CALC=10.83 PPG -SURVEY EVERY-90 FT -MUD WEIGHT:10.1 PPG IN,10.1PPG OUT -ROT-6.5 HRS,JAR-35.4 HRS Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 28 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 18:00 6.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 6799' MD TO 7176'MD(5505'TVD) -550 GPM, 2175 PSI ON,2000 PSI OFF -140 RPM,8-13K TORQUE ON,8-10K TORQUE OFF -PU 190K,SO 132K,ROT 141K -WOB 10-12K -ECD:ACTUAL=11.40 PPG -SURVEY EVERY-90 FT -BACKREAM 20'PRIOR TO CONNECTIONS -ROT-3.7 HRS,JARS-39.1 HRS MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -20 BBL HIGH VIS SWEEP AT 7100'MD. -20%INCREASE IN CUTTINGS NOTED. SPR'S:7176'MD(5505'TVD)MW=10.1 PPG. #1 MP-20/30 SPM=240/300 PSI #2 MP-20/30 SPM=225/300 PSI 18.00 - 23:00 5.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 7176' MD TO 7463'MD(5647'TVD) -550 GPM. 2200 PSI ON,2130 PSI OFF 130 RPM,9-14KTORQUE ON,7-13KTORQUE OFF -PU 201K,SO 130K,ROT 143K -WOB 10-12K -ECD:ACTUAL=11.60 PPG SURVEY EVERY-90 FT -BACKREAM 60'PRIOR TO CONNECTIONS -ROT-2.5 HRS,JARS-41.6 HRS -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -20 BBL LOW-VIS FOLLOWED BY 20 BBL HIGH-VIS SWEEP AT 7280'MD. -30%INCREASE IN CUTTINGS NOTED. 23:00 - 00:00 1.00 DRILL N RREP 7,463.00 INTI CODE 8 DRILLER UNABLE TO RELEASE BRAKE ON DRAWWORKS. -REDUCE RPM AND FLOW RATE WHILE TROUBLESHOOTING PROBLEM; -15 RPM;250 PGM. -CALL OUT ELECTRICIAN,MECHANIC AND SR.RIG MANAGER. -ELECTRICIAN FOUND ONE OF THE VFD'S FOR THE DRAWWORKS WAS IN THE"HAND" POSITION AND THE OTHER IN THE"REMOTE" POSITION. CLEARED FAULT HISTORY AND SET BOTH VFD'S IN THE"REMOTE" POSITION. Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 29 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/23/2014 00:00 - 12:00 12.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 7463' MD TO 8315'MD -500 GPM, 2200 PSI ON,2150 PSI OFF -126 RPM,14K TORQUE ON,11K TORQUE OFF PU 210K,SO 140K,ROT 153K -WOB 6K -ECD:ACTUAL=11.8 PPG,CALC=11.13 PPG -SURVEY EVERY—90 FT -BACKREAM 15 FT PRIOR TO CONNECTIONS MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -PUMPED 20 BBL LO-VIS FOLLOWED BY 20 BBL HIGH-VIS SWEEP AT 7549'MD. -20%INCREASE IN CUTTINGS NOTED. -DUMPED AND DILUTED WITH 290 BELS NEW 10.3 LSND AT 7680'MD. -REDUCED FLOW RATE FROM 550 GPM TO 500 GPM AT 04:30 TO MANAGE ECD. SPR'S:8218'MD(6024'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=235/310 PSI #2MP-20/30 SPM=245/320 PSI 12:00 - 18:00 6.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 8315' MD TO 8695'MD -510 GPM, 2100 PSI ON,2000 PSI OFF -120 RPM,14K TORQUE ON,13K TORQUE OFF -PU 223K,SO 144K,ROT 160K -WOB 11-12K -ECD:ACTUAL=11.6 PPG,CALC=11.13 PPG -SURVEY EVERY—90 FT -BACKREAM 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -INCREASED FLOW RATE FROM 500 GPM TO 510 GPM AT 12:00 AS PER TOWN ENGINEER. -PUMPED 20 BBL 11.8 PPG WEIGHTED SWEEP AT 8695'MD. -15%INCREASE IN CUTTINGS NOTED SPR'S:8695'MD(6238'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=225/310 PSI #2MP-20/30 SPM=230/310 PSI 18:00 - 00:00 6.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 8695' MD TO 9156'MD -510 GPM, 2130 PSI ON,2100 PSI OFF -126 RPM,15K TORQUE ON,12K TORQUE OFF -PU 225K,SO 144K,ROT 161K -WOB 12K -ECD:ACTUAL=11.6 PPG,CALC=11.13 PPG -SURVEY EVERY—90 FT -BACKREAM 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT SPR'S:9066'MD(6381'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=235/315 PSI #2MP-20/30 SPM=230/325 PSI Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 30 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/24/2014 00:00 - 02:00 2.00 DRILL P INTI I DRILL 8.5"INTERMEDIATE HOLE FROM 9156' MD TO 9262'MD -510 GPM, 2130 PSI ON,2100 PSI OFF -126 RPM,15K TORQUE ON,12K TORQUE ;OFF -PU 225K,SO 144K,ROT 161K WOB 12K ECD:ACTUAL=11.6 PPG,CALC=11.13 PPG -SURVEY EVERY-90 FT -BACKREAM 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT STOP 100'ABOVE PROJECTED TOP OF CM3 PER FIELD GEOLOGIST FOR PLANNED WIPER TRIP. CALL AND DISCUSS WITH ODE. SPR'S:9167'MD(6409'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=220/305 PSI #2 MP-20/30 SPM=225/305 PSI 02:00 - 04:00 2.00 DRILL P INTI CIRCULATE BOTTOMS-UP 3 TIMES -500 GPM,2125 PSI 126 RPM,13K TORQUE STAND 1 STAND BACK WITH EACH II BOTTOMS UP. -SHAKERS CLEANED UP ON 3RD BOTTOMS UP. 04:00 - 05:00 1.00 DRILL P INT1 PULL OUT OF THE HOLE ON ELEVATORS (SHORT TRIP)FROM 8979'MD TO 8501'MD -MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:10.3PPG IN,10.3 PPG OUT -PU 240K,SO 143K AT 8790'MD -PULLED 30K OVER AND WIPED TIGHT HOLE AT 8650'AND 8539'. -PULLED 30K OVER AT 8432'AND ATTEMPT I TO WIPE TIGHT HOLE. 05:00 - 08:30 3.50 DRILL P INTI I CIRCULATE TIGHT HOLE PER SHORT TRIP TIGHT HOLE STRATEGY IN WELL PLAN. -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT. -RUN BACK IN THE HOLE ONE STAND. -CIRCULATE HOLE CLEAN -560 GPM;3400 PSI.UP -410 GPM;1550 PSI DOWN -180 RPM AND 13K TORQUE. -RECIPROCATING PIPE 90'MD. -PU 227K,SO 140K,ROT 156K 08:30 09:00 0.50 DRILL P INTI SERVICE RIG 09:00 - 12:00 3.00 DRILL N RREP 8,501.00 INTI CODE 8 -LINK ROTATION MOTOR -REPLACED MOTOR -MONITOR WELL VIA TRIP TANK AND HOLE FILL -CIRCULATE BOTTOMS UP AFTER CONFIRMING NEW MOTOR WORKED. 12:00 - 15:00 3.00 DRILL P INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 8410'MD TO 6890'MD -MUD WEIGHT:10.3PPG IN,10.3 PPG OUT -PU 222K,SO 135K AT 8410'MD -PULLED 30K OVER AND WIPED TIGHT HOLE AT 6890'MD Printed 7/21/2014 10:2241AM North America-ALASKA-BP Page 31 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 I End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM i Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B @64.5ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 16:00 1.00 • DRILL P INTI CIRCULATE BOTTOMS UP 2 TIMES 6890'MD -565 GPM,2200 PSI -180 RPM,3K TORQUE RECIPROCATE PIPE AT 10 FT/MIN 16:00 - 19:00 3.00 DRILL P INTI I ATTEMPT TO PULL OUT OF THE HOLE ON ELEVATORS FROM 6890'MD TO 6791'MD MUD WEIGHT:10.3PPG IN,10.3 PPG OUT -PU 148K,SO 150K AT 6800'MD -PULLED 40K OVER AND WIPED TIGHT HOLE AT 6791'MD -RUN IN THE HOLE 2 STANDS TO 7000'MD AND CIRCULATE BOTTOMS UP 3X -565 GPM,2150 PSI 150 RPM,10K TORQUE -RECIPROCATE PIPE AT 25 FT/MIN -PULLED 2 STANDS AND PULLED 40K OVER AT 6791'AGAIN. NOTE:CI MEETING WAS HELD BETWEEN 1700 AND 1800 BETWEEN PARKER DRILLING AND BP,SUPERINTENDENTS FROM BOTH WERE PRESENT 19:00 - 00:00 5.00 DRILL P INTI BACKREAM OUT OF THE HOLE FROM 6791' MD TO 5092'MD MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT 10.3 PPG IN,10.3 PPG OUT -565 GPM,2100 PSI AT 6791'MD -150 RPM,7K TORQUE,135K ROTATING WEIGHT -BACKREAMING SPEEDS FROM 300 FT/HR- 400 FT/HR 5/25/2014 00:00 - 05:00 5.00 DRILL P INTI BACKREAM OUT OF THE HOLE FROM 5092' MD TO 2655'MD(CASING WINDOW) MONITOR WELL FOR 10 MINUTES AT THE •WINDOW:STATIC -MUD WEIGHT 10.3 PPG IN,10.3 PPG OUT 1-565 GPM,2100 PSI 150 RPM,7K TORQUE -BACKREAMING SPEEDS FROM 400 FT/HR- •425 FT/HR 05:00 - 05:30 0.50 DRILL P INTI CIRCULATE BOTTOMS UP 1 TIME -550 GPM,1620 PSI -70 RPM,1-2K TORQUE 05:30 - 11:00 5.50 DRILL P INTI RUN IN THE HOLE WITH 8-1/2"RSS DRILLING ASSEMBLY. -FROM 2655'MD TO 9262'MD. -FILLING PIPE EVERY 20 STANDS. -WASH THE LAST STAND TO BOTTOM. -NO FILL NOTED ON BOTTOM. Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 32 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 ~ DRILL t P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 9262' MDTO9357'MD -515 GPM, 2280 PSI ON,2250 PSI OFF -135 RPM,16K TORQUE ON,14K TORQUE OFF -PU 225K,SO 144K,ROT 161K ! I WOB 12K ECD:ACTUAL=11.5 PPG,CALC=11.13 PPG -SURVEY EVERY-90 FT -BACKREAM 20 FT PRIOR TO CONNECTIONS MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT SPR'S:9357 MD(6466'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=330/415 PSI #2 MP-20/30 SPM=330/420 PSI 12:00 - 18:00 6.00 DRILL P INTI ;DRILL 8.5"INTERMEDIATE HOLE FROM 9357' 'MD TO 9850'MD -530 GPM, 2300 PSI ON,2280 PSI OFF 150 RPM,16K TORQUE ON,14K TORQUE OFF PU 230K,SO 139K,ROT 166K WOB 12K ECD:ACTUAL=11.5 PPG,CALC=11.13 PPG -SURVEY EVERY-90 FT BACKREAM 30 FT PRIOR TO CONNECTIONS -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT i SPR'S:9850'MD(6594'TVD)MW=10.3 PPG. '#1 MP-20/30 SPM=260/375 PSI #2 MP-20/30 SPM=275/375 PSI 18:00 - 00:00 6.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 9850' MD TO 10136'MD ,-530 GPM, 2450 PSI ON,2300 PSI OFF 150 RPM,16-20K TORQUE ON,15K TORQUE OFF -PU 230K,SO 139K,ROT 166K -WOB 14K -ECD:ACTUAL=11.6 PPG,CALC=11.23 PPG -SURVEY EVERY-90 FT -BACKREAM 30 FT PRIOR TO CONNECTIONS I-MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 33 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/26/2014 00:00 - 06:00 6.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 10136' MD TO 10,541'MD -530 GPM, 2300 PSI ON,2280 PSI OFF -150 RPM,16K TORQUE ON,14K TORQUE OFF -PU 230K,SO 139K,ROT 166K -WOB 12K -ECD:ACTUAL=11.5 PPG,CALC=11.22 PPG -SURVEY EVERY-90 FT -BACKREAM 30 TO 60 FT PRIOR TO CONNECTIONS -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -PUMPED 9.8 PPG(20 BBL)LO-VIS SWEEP FOLLOWED BY 10.3 PPG(20 BBL)HI-VIS SWEEP AT 10400'MD -MINIMAL INCREASE IN CUTTINGS -DUMPED AND DILUTED WITH 580 BBLS NEW 10.3 LSND AT 10500'MD. 'SPR'S: 10300'MD(6723'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=280/370 PSI #2MP-20/30 SPM=270/370 PSI 06:00 - 12:00 6.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 10541' MD TO 10970'MD -525 GPM, 2350 PSI ON,2310 PSI OFF -145 RPM,18-20K TORQUE ON,15K TORQUE OFF -PU 232K,SO 140K,ROT 164K -WOB 15K -ECD:ACTUAL=11.6 PPG,CALC=11.28 PPG -SURVEY EVERY-90 FT -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -CIRCULATE FOR 5 MIN AFTER EACH STAND IS DRILLED DOWN AT FULL PUMP RATE AND RPM SPR'S:10780'MD(6854'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=330/420 PSI #2MP-20/30 SPM=320/400 PSI 12:00 - 18:00 6.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 10970' MD TO 11479'MD -510 GPM, 2330 PSI ON,2200 PSI OFF -140 RPM,20K TORQUE ON,18K TORQUE OFF -PU 242K,SO 142K,ROT 169K -WOB 15K -ECD:ACTUAL=11.6 PPG,CALC=11.28 PPG -SURVEY EVERY-90 FT -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -CIRCULATE FOR 5 MIN AFTER EACH STAND IS DRILLED DOWN AT FULL PUMP RATE AND RPM -BLED OA FROM 800 PSI DOWN TO 300 PSI AT 17:00HRS. SPR'S:11345'MD(7012'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=330/405 PSI #2MP-20/30 SPM=325/405 PSI Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 34 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 11479' MD TO 11960'MD -510 GPM, 2420 PSI ON,2420 PSI OFF -140 RPM,21K TORQUE ON,18K TORQUE OFF -PU 242K,SO 142K,ROT 169K -WOB 14K -ECD:ACTUAL=11.7 PPG,CALC=11.28 PPG -SURVEY EVERY-90 FT -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -CIRCULATE FOR 5 MIN AFTER EACH STAND IS DRILLED DOWN AT FULL PUMP RATE AND RPM SPR'S:11921'MD(7180'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=310/430 PSI #2 MP-20/30 SPM=330/430 PSI 5/27/2014 00:00 - 08:30 8.50 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 11980' MD TO 12,583'MD -510 GPM, 2600 PSI ON,2550 PSI OFF -140 RPM,20-25K TORQUE ON,20-22K TORQUE OFF PU 274K,SO 144K,ROT 174K WOB 18K -ECD:ACTUAL=11.78 PPG,CALC=11.38 PPG -SURVEY EVERY-90 FT -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -CIRCULATE FOR 5 MIN AFTER EACH STAND IS DRILLED DOWN AT FULL PUMP RATE AND RPM SPR'S:12393'MD(7416'TVD)MW=10.3 PPG. #1 MP-20/30 SPM=360/440 PSI #2 MP-20/30 SPM=340/450 PSI 08:30 - 16:00 7.50 DRILL P INTI CIRCULATE HOLE CLEAN AT 12,583'MD WITH 9 BOTTOMS UP -565 GPM UP,465 GPM DOWN,2800 PSI -150-175 RPM,22-24K TORQUE -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -RECIPROCATE PIPE 90'FT AT 400-1200 FT/MIN -CALCULATED ECD=11.3 PPG -ECD:8:OOAM-9:OOAM=11.6-11.65 ACTUAL 12:OOPM-13:OOPM=11.5 ACTUAL 15:OOPM-16:OOPM=11.45 ACTUAL -INITIAL CUTTINGS LOAD SIMILAR TO DRILLING LOAD. CUTTINGS VOLUME DROPS OFF THROUGHOUT CIRCULATING WITH RETURNS CLEANING UP AT THE END OF 9 BOTTOMS UP. Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 35 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) --- Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 22:30 6.50 DRILL P INTI INCREASE MUD WEIGHT FROM 10.3PPG TO 10.6PPG WITH BLACK PRODUCT SPIKE FLUID OVER 3 FULL CIRCULATIONS -CUTTINGS LOAD AT SHAKERS INCREASED WITH HIGHER MUD WEIGHT,CIRCULATED UNTIL SHAKERS WERE CLEAN -ECD INCREASED FROM 11.45 TO 11.84 DURING WEIGHT UP AT 565 GPM -565 GPM UP,465 GPM DOWN,2800 PSI -150-175 RPM,22-24K TORQUE -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT - RECIPROCATE PIPE 90'FT AT 400-1200 FT/MIN 22:30 - 00:00 1.50 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 12,583'MD TO 12,678'MD -500 GPM, 2370 PSI ON,2340 PSI OFF 140 RPM,22K TORQUE ON,20K TORQUE OFF -PU 281K,SO 145K,ROT 183K -WOB 15K -ECD:ACTUAL=11.8 PPG,CALC=11.56 PPG -SURVEY EVERY-90 FT -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT -CIRCULATE FOR 5 MIN AFTER EACH STAND IS DRILLED DOWN AT FULL PUMP RATE AND RPM SPR'S:12580'MD(7532'TVD)MW=10.6 PPG. #1 MP-20/30 SPM=210/310 PSI #2 MP-20/30 SPM=215/315 PSI 5/28/2014 00:00 - 11:00 11.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 12,678'MD TO 13,381'MD -485 GPM, 2480 PSI ON,2400 PSI OFF -140 RPM,27K TORQUE ON,24K TORQUE OFF -PU 298K,SO 144K,ROT 189K -WOB 15K -ECD:ACTUAL=11.89 PPG,CALC=11.62 PPG -SURVEY EVERY-90 FT -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT -CIRCULATE FOR 5 MIN AFTER EACH STAND IS DRILLED DOWN AT FULL PUMP RATE AND RPM NOTE:DECREASED PUMP RATE FOR ECD MANAGMENT SPR'S:13,054'MD(7889'TVD)MW=10.6 PPG. #1 MP-20/30 SPM=310/400 PSI #2 MP-20/30 SPM=300/4055 PSI Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 36 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 00:00 13.00 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 13,381'MD TO 13,424'MD -DRILLING 6'MD(5'TVD)INTERVALS AND CIRCULATING BOTTOMS UP BETWEEN EACH SECTION LOOKING FOR THE TOP OF SAG RIVER FORMATION DRILLING PARAMETERS -550 GPM, 2800 PSI ON,2760 PSI OFF -140 RPM,30K TORQUE ON,28K TORQUE OFF -PU 299K,SO 148K,ROT 192K -WOB 15K -ECD:ACTUAL=11.7 PPG,CALC=11.68 PPG -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT CIRCULATING PARAMETERS -550 GPM,2890 PSI -140 RPM, 28K TORQUE -RECIPROCATE 90 FT WHILE ROTATING AT FULL RATE ON UP STROKE,DECREASE PUMP OUTPUT TO 80%ON DOWN STROKE -WORK PIPE AT 200 FT/HR-1000 FT/HR NOTE:FUNCTION TEST BOPE EQUIPMENT 5/29/2014 00:00 - 07:30 7.50 DRILL P INTI DRILL 8.5"INTERMEDIATE HOLE FROM 13,424'MD TO 13,448'MD -DRILLING 6'MD(5'TVD)INTERVALS AND CIRCULATING BOTTOMS UP BETWEEN EACH SECTION LOOKING FOR THE TOP OF SAG RIVER FORMATION NOTE:CALL TD AT 13,448'MD,DETERMINED BY WELLSITE GEOLOGIST -NEAR BIT GR SHOWS START OF TOP RABBIT EAR AT TSAG -GLAUCONITE OBSERVED IN SAND SAMPLES DRILLING PARAMETERS -550 GPM, 2800 PSI ON,2760 PSI OFF,140 RPM,30K TORQUE ON,26K TORQUE OFF, 16K -PU 299K,SO 148K,ROT 192K -ECD:ACTUAL=11.7 PPG,CALC=11.68 PPG -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT CIRCULATING PARAMETERS -550 GPM,2800 PSI,140 RPM, 28K TORQUE -RECIPROCATE 90 FT WHILE ROTATING AT FULL RATE ON UP STROKE,DECREASE PUMP OUTPUT TO 80%ON DOWN STROKE -WORK PIPE AT 200 FT/HR-1000 FT/HR SPR'S:13,448'MD(8202'TVD)MW=10.6 PPG. #1 MP-20/30 SPM=250/340 PSI #2 MP-20/30 SPM=250/350 PSI Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 37 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 09:00 1.50 DRILL P INTI PUMP OUT OF THE HOLE (SHORT TRIP) FROM 13,448'MD TO 12,964'MD(THRZ) -MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:10.6PPG IN,10.6 PPG OUT 60 GPM,100 PSI,25 FPH -PU 330K,SO 143K AT 13,448'MD 09:00 - 14:00 5.00 DRILL P INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 12,964'MD TO 8,970'MD -MONITOR WELL FOR 5 MIN:STATIC -MUD WEIGHT:10.6PPG IN,10.6 PPG OUT -PU 240K,SO 130K AT 12,585'MD -PULL INTO MINOR CUTTINGS BEDS AT 12476'MD AND 11416'MD. WIPE THROUGH WITH NO ISSUES ON SECOND PASS. 14:00 - 15:30 1.50 DRILL P INTI CIRCULATE BOTTOMS UP 3 TIMES AT 8,970' MD(200'ABOVE LAST SHORT TRIP) -550 GPM AT 2100 PSI UP,400 GPM AT 1800 PSI DOWN,140 RPM,14K TORQUE 15:30 - 20:00 4.50 DRILL P INTI RIH WITH 8.5"DRILLING BHA ON ELEVATORS FROM 8,970'MD TO 13,448'MD -FILL PIPE EVERY 2000'MD NO FILL OBSERVED ON BOTTOM NOTE:ENCOUNTERED TIGHT HOLE AT 12,195' MD SET 30K DOWN,WASHED AND REAMED TIGHT SPOT 550 GPM AT 150 RPM.WORKED THROUGH TIGHT SPOTS 2X WITH NO ROTATION OR PUMPING WITH NO OBSTRUCTIONS 20:00 - 00:00 4.00 DRILL P INTI CIRCULATE BOTTOMS UP 5 TIMES AT 13,448' MD(TD) -550 GPM,2900 PSI,140 RPM, 24K TORQUE -RECIPROCATE 90 FT WHILE ROTATING AT FULL RATE ON UP STROKE,DECREASE PUMP OUTPUT TO 80%ON DOWN STROKE, 400-1000 FPH -ADDED 580 BBLS OF LSND DILUTION FLUID TO ACTIVE MUD SYSTEM 5/30/2014 00:00 - 01:30 1.50 DRILL P INTI PUMP OUT OF THE HOLE (FINAL TRIP)FROM 13,448'MD TO 12,964'MD -MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:10.6PPG IN,10.6 PPG OUT -30 GPM,20 PSI,30 FPM -PU 325K OFF BOTTOM(PUMPS ON) -NO TIGHT SPOTS PULLING TO TOP OF HRZ 01:30 - 11:00 9.50 DRILL P INTI PULL OUT OF HOLE WITH 8-1/2"DRILLING ASSEMBLY ON ELEVATORS FROM 12,964'MD TO WINDOW AT 2674'MD,RACKING BACK 5" DRILLPIPE. -PU 100K,SO 100K AT 2,563'MD -NO ISSUES PULLING OUT OF THE HOLE ON ELEVATORS -DRIFT PIPE WITH 2.4"RABBIT FOR LINER -MONITOR WELL ON TRIP TANK,HOLE TAKING CORRECT DISPLACEMENT -MONITOR WELL AT WINDOW FOR 10 MIN: STATIC Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 38 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay I Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/me:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. j UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft)- 11:00 13:30 2.50 DRILL P INTI PULL OUT OF HOLE WITH 8-1/2"DRILLING ASSEMBLY FROM WINDOW AT 2674'MD TO BHAAT 631'MD,LAYING DOWN 5"DRILLPIPE. MONITOR WELL FOR 10 MIN WHILE PULLING PS-21 HYDRAULIC SLIPS(PRIOR TO PULLING BHA INTO STACK)=STATIC. 13:30 - 16:00 2.50 DRILL P INTI RACK BACK 5"HWDPAND LAYDOWN 8-1/2" 'DRILLING ASSEMBLY FROM 631'MD TO SURFACE. GRADE BIT 3-1-IN GAUGE •-NO SIGNIFICANT WEAR ISSUES NOTED ON BHA. 16:00 - 20:00 4.00 CASING P INTI RIG UP TO RUN T.LINER -MAKE UP LINER HANGER WITH TWO JOINTS OF 5"HWDP,ADD PAL-MIX AND RACK BACK • IN DERRICK INSTALL DOYON CASING VOLANT TOOL ON TOP DRIVE AND RIG UP STANDARD SET OF CASING TONGS -INSTALL PS-21 7"SLIP INSERTS 20:00 - 00:00 4.00 CASING P INTI PICK UP AND MAKE UP 7",26#,L-80,VT HC, LINER SHOE TRACK FROM SURFACE TO 857' MD -CHECK FLOATS=HOLDING -FILL UP PIPE ON THE FLY,TOPPING OFF EVERY 20 JOINTS INSIDE THE CASING • BAKERLOK SHOE TRACK -TORQUE TURN CONNECTIONS TO 11950FT/LBS -RUN FLOATING CENTRALIZERS WITH STOP RINGS ON JOINTS 1-33 -PU 50K,SO 50K AT 857'MD MUD WEIGHT:10.6PPG IN,10.6 PPG OUT NOTE:SURFACE TEST TURBOCASER AND OBTAIN PUMP RATES -2 BBLS/MIN=76 PSI -4 BBLS/MIN=195 PSI -5 BBLS/MIN=290 PSI -6 BBLS/MIN=386 PSI Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 39 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB OS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ! Description of Operations (hr) (usft) 5/31/2014 00:00 - 11:00 ' 11.00 CASING P I INTI RUN T,26#,L-80,857'MD LINER FROM 857' TO 5774'MD -USE JET LUBE SEAL GUARD PIPE DOPE& TORQUE CONNECTIONS TO 11,950 FT-LBS RUN FLOATING OMD HYDROFORM CENTRALIZERS ON JOINTS 1-33 -RUN 40 CENTEK BOW SPRING CENTRALIZERS ON JOINTS DETERMINED BY ODE FOR STANDOFF DURING XO TO DRILLPIPE -FILL CASING EVERY JOINT ON THE FLY. I TOP OFF EVERY 20 JOINTS IN THE CASING, EVERY 10 JOINTS IN OPEN HOLE BY CIRCULATING DOWN AT 6 BPM FOR 3 MIN -RECORD PU/SO WEIGHTS EVERY 10 JOINTS -BEGIN RUNNING IN HOLE AT 120 FPM. STAGE DOWN RUNNING SPEED TO 50 FPM WHEN ENTERING OPENHOLE. -CIRCULATE 1.5X BOTTOMS UP AT 6 BPM, 710 PSI AT 9-5/8"CASING WINDOW 2674'MD -PU 76K,SO 79KAT 2691'MD WINDOW AFTER BREAKING CIRCULATION AT(6BPM/ 880 PSI)ON JOINT#140 AT 5774'MD(WITH -20 BBLS LOSS),PUMPS ARE SHUT DOWN 'AND WELL IS CONFIRMED TO STILL BE FLOWING WITH PUMPS OFF. SPACE OUT AND SECURE WELL PER STANDING ORDERS. iNITIAL STABILIZED CASING PRESSURE=72 PSI. MAKE NOTIFICATIONS. 11:00 - 12:00 1.00 CASING N DPRB 5,774.00 INTI PERFORM EXHALE TEST TO CONFIRM WELLBORE BREATHING -MAKEUP 5"DP SAFETY JOINT ON TOP OF I FOSV STABBED IN LINER. INSTALL 5" MANUAL ELEVATORS AND WORK PIPE THROUGH ANNULAR AS REQUIRED. PIPE SHOWS NO SIGNS OF STICKING. I-CASING PRESSURE DROPS FROM 72 PSI TO I60 PSI WHILE MAKING PREPARATIONS. -PERFORM EXHALE TEST THROUGH CHOKE TO MGS. BLEED BACK 0.5 BBLS IN 2 MIN. FLOW STOPS AND WELL IS CONFIRMED DEAD WITH NO ADDITIONAL FLOWBACK. -WITH WTL PERMISSION,OPEN ANNULAR PREVENTER AND CONFIRM WELL IS DEAD. AGREE ON PLAN FORWARD TO FINGER PRINT ALL FUTURE FLOWBACK FOLLOWING CIRCULATING. Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 40 of 74 Operation Summary Report Common Well Name: 18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 22:30 10.50 CASING P INTI MAKEUP AND RUN IN HOLE WITH 7",26#, L-80,VAMTOP LINER FROM 5774'MD TO LINER TOTAL LENGTH AT 10,981'MD -USE JET LUBE SEAL GUARD PIPE DOPE& TORQUE CONNECTIONS TO 11,950 FT-LBS -FILL AND TOP OFF LINER EVERY JOINT. -RUNNING SPEED=30 FPM -RECORD PU/SO WEIGHTS EVERY 10 JOINTS -MAKE UP LINER HANGER STAND OUT OF DERRICK CIRCULATE BOTTOMS UP OVER 4 JOINTS AT TOP OF UGNU(5772'MD);4 BPM,650 PSI. FINGERPRINT FLOWBACKAFTER PUMPS 'OFF. AVERAGE BLEED BACK-5 BBLS. 22:30 - 00:00 1.50 CASING P INTI RUN 7"LINER IN HOLE ON 5"DRILLPIPE FROM 10,981'MD TO 12,000'MD -BREAK CIRCULATION EVERY 5 STAND -RECORD PU/SO WEIGHTS EVERY 1000' -MUD WEIGHT 10.6 IN;10.6 OUT -RUNNING SPEED=30 FPM 6/1/2014 00.00 - 01:00 1.00 CASING P INTI RUN 7"LINER IN HOLE ON 5"DRILLPIPE FROM 12,000'MD TO 12,585'MD -FILL PIPE EVERY 5 STANDS -RECORD PU/SO WEIGHTS EVERY 1000' -MUD WEIGHT 10.6 IN;10.6 OUT -RUNNING SPEED=30 FPM -PU 315K,SO 115KAT 12,560'MD I I I NOTE:WORKED THROUGH TIGHT SPOT AT i 12,125'MD Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 41 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 02:00 1.00 CASING N STUC 12,585.00 INTI ENCOUNTERED TIGHT SPOT AT 12,585'MD -ATTEMPTED TO PU 50K OVER;DID NOT PULL FREE -ATTEMPTED TO CIRCULATE;PRESSURE SPIKED TO 630PSI AT 1.5 BBL/MIN. IMMEDIATELY SHUT DOWN PUMPS -CONTACTED ODE AND ROTARY SUPERINTENDENT -DECISION WAS MADE TO TRY PULLING TO 400K;NO SUCCESS -CONTACT ODE AND DECISION WAS MADE TO INCREASE PU WEIGHT TO 420K; NO SUCCESS -INCREASE PU WEIGHT TO 430K; NO SUCCESS -SLACKED OFF TO NEUTRAL WEIGHT WORKED PIPE BACK UP AND CAME FREE AT 390K -ATTEMPT PUMPING AT 0.5 BBLS/MIN WHILE RECIPROCATING PIPE;NO RETURNS -RACK BACK 1 STAND IN DERRICK -PICK UP SINGLE FROM PIPE SHED ESTABLISH CIRCULATION WHILE RECIPROCATING PIPE IN 90'STROKES AT 10 FT/MIN BETWEEN DEPTHS OF 12,530'MD TO 12,440'MD -42 GPM=INITIAL 450 PSI -63 GPM=INITIAL 600 PSI -84 GPM=INITIAL 655 PSI -105 GPM=INITIAL 730 PSI -126 GPM=INITIAL 752 PSI -NOTE:INITAIAL DYNAMIC LOSS RATE= 72BBLS/HR AT 3BBLS/MIN,680 PSI -PU 300K,SO 1380K WHILE CIRCULATING 02:00 - 08:30 6.50 CASING P INTI WASH IN THE HOLE WITH 7"LINER ON 5"DP FROM 12,557'MD TO 12,900'MD -FINGERPRINT FLOWBACKAFTER WASHING DOWN EACH STAND -CIRCULATE BOTTOMS UP WHILE WASHING FIRST TWO STANDS DOWN -UTILIZE TURBO CASER TOOL TO WASH AND REAM THROUGH THE COLEVILLE TO THE TOP OF THE HRZ -ENCOUNTERED SIGNS OF PACKING OFF FROM 12,785'MD TO 12,880'MD -3 BPM,730 PSI -DYNAMIC LOSS RATE-72 BBL/HR 08:30 - 10:00 1.50 CASING P INTI RUN THE HOLE WITHOUT PUMPING FROM 12,900'MD TO 13,448'MD -OBTAIN PU/SO WEIGHTS EVERY STAND -PU 309K,145K -MUD WEIGHT IN 10.6PPG,10.6PPG OUT -WIPE THROUGH TIGHT SPOTS AS NEEDED -RIG UP CEMENT HEAD -TAG BOTTOM,SET DOWN 10K,PICK UP BREAKOVER WEIGHT PLUS 2 FEET Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 42 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 • End Date: ,X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 16:00 8.00 CASING P INTI STAGE UP TO CEMENTING RATE IN 0.5 BPM !INCREMENTS TO FINAL CIRCULATING RATE OF 3 BPM. -@ 1 BPM,640 PSI -@ 1.5 BPM,670 PSI -@ 2 BPM,720 PSI -@3BPM,816PSI • -@ 4 BPM,880 PSI -@ 5 BPM,1060 PSI -@ 6 BPM,1250 PSI CONDITION MUD TO 10.6 PPG, 13 PV, 19 YP -INITIAL PRESSURE AT CEMENTING RATE: 1250 PSI -FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED:1290 PSI -NO RECIPROCATION OF PIPE CIRCULATE AND CONDITION MUD AT 250 'GPM,1250 PSI •-MUD LOSSES:528 BBL -LOSS RATE-38BBLS/HR -NOTE:HELD PJSM WITH RIG CREW AND CEMENT CREW,START BATCH MIXING MUD 'PUSH 16:00 - 17:00 1.00 CASING P INTI FINGERPRINT WELL '-RETURNED 70 BBLS IN 30 MINUTES WITH DECREASEING IN TREND FROM 5BPM TO 1 BPM. Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 43 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 20:30 3.50 CASING P INTI CEMENT 7"INTERMEDIATE LINER AS FOLLOWS: -FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOW,4500 PSI HIGH FOR 5 MINUTES -PUMP 31.2 BBLS OF 12.0 PPG MUDPUSH II SPACER @ 5 BPM,700 PSI PUMP 50.8 BBLS OF 15.8 PPG CLASS,G TAIL @ 5 BPM,EXCESS VOLUME 30% (YIELD 1.167 CU.FT/SK) DROP DRILL PIPE WIPER DART WITH 10 BBL OF FRESH WATER FROM SLB PERFORM DISPLACEMENT WITH RIG PUMP -20 BBLS DISPLACED AT 6 BPM:ICP 700 PSI 7%RETURN FLOW,FCP 830 PSI 7%RETURN FLOW,CAUGHT PRESSURE @ 4.8 BBL INTO DISPLACEMENT '-10 BBLS DISPLACED AT 3 BPM:ICP 244 PSI 6%RETURN FLOW,FCP 277 PSI 7%RETURN FLOW,LATCH UP CONFIRMED AT 36.8 BBLS 'DISPLACED 356 BBLS DISPLACED AT 6 BPM:ICP 950 PSI 6%RETURN FLOW,FCP 1540 PSI 7%RETURN FLOW '-25 BBLS DISPLACED AT 4 BPM:ICP 1107 PSI 7%RETURN FLOW,FCP 1107 PSI 7%RETURN FLOW -15 BBLS DISPLACED AT 3 BPM:ICP 915 PSI 6%RETURN FLOW,FCP 915 PSI 6%RETURN FLOW -5.8 BBLS DISPLACED AT 2 BPM:ICP 770 PSI 6%RETURN FLOW,FCP 797 PSI 6%RETURN FLOW -REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 797 PSI -CIP @ 20:25 05/01/2014 -TOTAL DISPLACEMENT VOLUME 447 BBLS (MEASURED BY STROKES @ 96%PUMP EFFICIENCY) -TOTAL_ LOSSES DURING CEMENT JOB:160 BBLSAND 70 BBL BREATHED BACK AFTER BUMPING PLUG_ -INCREASE PRESSURE TO 3000 PSI TO SET HANGER AFTER PLUG BUMP -SET DOWN LINER WT PLUS 35K TO CONFIRM HANGER SET -CHECK FLOATS-GOOD -PU TO EXPOSE DOG SUB AND SET DOWN ON LINER TOP 60K,15 RPM -PRESSURE UP TO 500 PSI AND PU TO REMOVE RS PACK-OFF AND CIRCULATE EXCESS CEMENT OFF LINER TOP -PU RUNNING TOOL ABOVE LINER TOP AND MARK NO-GO.CIRCULATE 1X BU AT 10 BPM, 380 PSI -0 BBLS OF EXCESS CEMENT TO SURFACE ON BOTTOMS UP -NO INDICATION OF BURSTING TURBO CASER BURST DISK -UNABLE TO DETERMINE TOP OF CEMENT Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 44 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) 1 Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @84.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 23:30 3.00 CASING P INTI RIG DOWN CEMENTING EQUIPMENT AND PREPARE TO PULL OUT OF THE HOLE BLOW DOWN ALL LINES -RIG DOWN CEMENT HEAD -LAY DOWN 3 JOINTS OF DP -CLEAN AND CLEAR RIG FLOOR 23:30 - 00:00 0.50 CASING P INTI HANG BLOCKS -PREP FOR SLIP AND CUT DRILLING LINE 6/2/2014 00:00 - 02:00 2.00 CASING P INTI SLIP AND CUT 127'OF DRILLING LINE -PJSM WITH ALL HANDS INVOLVED -VERIFY DEADMAN IS TORQUED TO PROPER SPEC -UNHANG BLOCKS -RECALIBRATE BLOCK HEIGHT IN AMPHION 'AND BAKER MWD -CLEAN UP AND PUT TOOLS AWAY 102:00 - 05:00 3.00 CASING P INTI POI-1 ON ELEVATORS FROM 2150'MD TO SURFACE -LAY DOWN HWDP MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT -PU 94K,SO 94KAT 2150'MD -ICE BEGAN FALLING FROM DERRICKAT LINER HANGER RUNNING TOOL,CLEARED RIG FLOOR AND BEGAN REMOVING ICE _ ! FROM DERRICK. 05:00 - 07:30 2.50 BOPSUR P INTI CHANGE OUT UPPER RAMS WHILE REMOVING ICE FROM DERRICK -DRAIN STACK -INSTALL 2 7/8"X 5 1/2"VARIABLE RAMS IN UPPER RAMS -MONITOR WELL BY PUMPING ACROSS MUD CROSS WITH BLIND RAMS CLOSED NOTE:SIMOPS,LAY DOWN LINER RUNNING TOOL AS PER BAKER REP. 07:30 - 10:30 3.00 BOPSUR P INT1 CHANGE-OUT SAVER SUB ON TOP DRIVE TO 4"XT-39 -C/O GRABBER DIES AND BELL GUIDE TO 4" -RE-INSTALL ROTATOR -SERVICE IBOP -MONITOR WELL BY PUMPING ACROSS MUD CROSS WITH BLIND RAMS CLOSED -SIMOPS:INSTALL 53/4"SWABS/LINERS AND INSTALL 4850PSI PINS IN PRVS 10:30 - 13:00 2.50 BOPSUR P INTI PULL WEAR BUSHING -MAKE UP PORTED SUB TEST JOINT -PULL WEAR RING -INSTALL TEST PLUG _ -FILL SURFACE LINES AND STACK _ 13:00 - 14:00 1.00 BOPSUR P INTI TEST ANNULAR AND UPPER PIPE RAMS TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH WITH 4"TEST JOINT -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WITNESS WAIVED BYAOGCC REP JEFF JONES -- I 14:00 - 15:00 1.00 BOPSUR P INTI RIG DOWN AFTER TESTING AND SET WEAR BUSHING 9 1/4"ID Printed 7/21/2014 1022:41AM North America-ALASKA-BP Page 45 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-116 @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 00:00 9.00 CLEAN P INTI LAY DOWN 5"DRILL PIPE TO SHED -RUN IN THE HOLE 48 STANDS TOTAL,24 STANDS ATATIME -MAKE UP CROSSOVER TO MULL SHOE -MONITOR WELL DISPLACEMENTS VIA TRIP TANK 6/3/2014 00:00 - 01:00 1.00 CLEAN P INTI CONTINUE LAYING DOWN 5"DRILL PIPE MUD WEIGHT IN 10.6 PPG,10.6 OUT -MONITOR DISPLACEMENT VIA TRIP TANK 01:00 - 03:00 2.00 CLEAN N CEMT 13,448.00 INTI PICK UP 6-1/8"CLEAN OUT ASSEMBLY TO 296' MD -MAKE UP CLEAN OUT BHA AS PER BAKER REP. -PICK UP AND MAKE UP 9 JOINTS OF HWDP -MONITOR DISPLACMENTS VIA TRIP TANK 03:00 - 08:00 5.00 CLEAN N CEMT 13,448.00 INTI RIH WITH 6-1/8"CLEAN OUT BHA FROM 296' MD TO 5685'MD -RIH ON ELEVATORS PICKING UP 4"DP STANDS OUT OF DERRICK -FILL PIPE EVERY 2500'MD,116 GPM AT 450 PSI -MONITOR DISPLACEMENT ON TRIP TANKS 08:00 - 20:00 12.00 CLEAN N CEMT 13,448.00 INTI RIH WITH 6-1/8"CLEAN OUT BHA FROM 5685 MD TO 13,299'MD -RIH ON ELEVATORS PICKING UP 4"DP SINGLES -TAGGED UP ON CEMENT AT 13,299'MD WITH 10K -FILL PIPE EVERY 2500'MD,250 GPM AT 1000 PSI -MONITOR DISPLACEMENT ON TRIP TANKS 20:00 - 21:30 1.50 CLEAN N CEMT 13,448.00 INTI CIRCULATE SWEEP -PUMP 4OBBL HI-VIS SWEEP SURFACE TO SURFACE -420 GPM AT 3400 PSI -SAW NO CEMENT ON SURFACE AT BOTTOMS UP OR AFTER SWEEP RETURNED TO SURFACE NOTE:SIMOPS-LAY DOWN 5"DRILLPIPE OFFLINE WHILE CIRCULATING SWEEP AROUND 21:30 - 00:00 2.50 CLEAN N CEMT 13,448.00 INTI PULL OUT OF HOLE ON ELEVATORS FROM 13,299'MD TO 9,950'MD MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT -PU 225K,SO 100KAT 13,209'MD 6/4/2014 00:00 - 06:00 6.00 CLEAN N CEMT 13,448.00 INTI CONTINUE TO PULL OUT OF HOLE ON ELEVATORS FROM 9,950'MD TO 293'MD -MONITOR WELL FOR 10 MINUTES AT BHA: STATIC MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT 06:00 - 07:30 1.50 CLEAN N CEMT 13,448.00 INTI LAY DOWN BHA -MONITOR WELL AT BHA FOR 10 MINUTES: STATIC -STAND BACK HWDP IN DERRICK -BREAK DOWN AND LAY DOWN 6-1/8"CLEAN OUT ASSEMBLY -EMPTY BOOT BASKETS;EMPTY -CLEAN AND CLEAR RIG FLOOR Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 46 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292118100 Active datum:18-118 @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 09:00 1.50 BOPSUR P INTI PREP FOR BOPE TEST -DRAIN STACK -PULL WEAR BUSHING -SET TEST PLUG -MAKE-UP 4.5"TEST JOINT -FILL LINES AND STACK 09:00 - 11:30 2.50 BOPSUR N RREP 13,448.00 : INTI CODE-8IADC TROUBLESHOOT AND REPAIR TEST PUMP -FOUR WAY CROSS ON TEST PUMP FAILED -REPLACE FOUR WAY CROSS 11:30 - 18:30 7.00 BOPSUR P INTI TEST BOPE TO 250 PSI LOW,3500 PSI HIGH !FOR 5 MINUTES EACH TEST WITH 2-7/8"AND 4.5"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WITNESS WAIVED BY AOGCC REP LOU GRIMALDI 18:30 - 19:30 1.00 BOPSUR P INTI RIG DOWN BOPE TEST EQUIPMENT -DRAIN STACK -PULL TEST PLUG -SET WEAR BUSHING -BLOW DOWN ALL LINES -LAY DOWN TEST JOINTS -CLEAN AND CLEAR RIG FLOOR 19:30 - 23:00 3.50 REMCMT N CEMT 13,448.00 INTI RIG UP SHLUMBERGER E-LINE -PJSM WITH SCHLUMBEGER FOR WIRELINE OPERATIONS -BRING ALL E-LINE TOOLS AND EQUIPMENT TO RIG FLOOR AND MAKE UP FUNCTION TEST TOOLS ON SURFACE 23:00 - 00:00 1.00 REMCMT N CEMT 13,446.00 INTI RUN IN THE HOLE WITH SLB E-LINE LOGGING TOOL -MAKE UP SLB USIT/MSIP TOOL WITH TOUGH TRAK TRACTOR ASSEMBLY '-RIH F/SURFACE T/2,800' 6/5/2014 00:00 - 05:00 5.00 REMCMT N CEMT 13,448.00 INTI RUN IN THE HOLE WITH SLB E-LINE LOGGING TOOL -RUN IN HOLE WITH SLB USIT/MSIP TOOL WITH TOUGH TRAK TRACTOR ASSEMBLY -RIH F/2,800 MD T/9200'MD -CALIBRATE TOOLS F/2950'MD T/3150'MD -TOOL STOPPED FREEFALLING AT 9200'MD, -72"INC -ATTEMPT TO ENGAGE TRACTOR-UNABLE TO POWER UP TRACTOR -TROUBLESHOOT SURFACE EQUIPMENT -POH WITH USIT LOGGING TOOL AND TRACTOR TO SURFACE 05:00 - 06:30 1.50 REMCMT N CEMT 13,448.00 INTI TROUBLE SHOOT E-LINE 1-RE-HEAD E-LINE TOOL Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 47 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64.50usft(above Mean Sea Level) Date I From-To • Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 20:00 13.50 REMCMT N CEMT 13,448.00 INTI RUN IN THE HOLE WITH SLB E-LINE LOGGING (TOOL RUN IN HOLE WITH SLB USIT/MSIP TOOL WITH TOUGH TRAK TRACTOR ASSEMBLY -RIH F/SURFACE T/13,299'MD -TOOL STOPPED FREEFALLING AT 9200'MD, -72°INC ENGAGE TRACTOR -LOG FROM 13,310'TO 6,950' I-NO CEMENT FOUND TOWN REQUESTED FPM DATA,DECISION TO RIH TO 10,120'MD -REPEAT LOG FROM 10,120'MD TO 9,500'MD -REPEAT LOG FROM 7,200'MD TO 6,000'MD -POH WITH USIT LOGGING TOOL AND TRACTOR TO SURFACE 20:00 - 21:00 1.00 CASING P INTI PRESSURE TEST 7"LINER TO 250 PSI LOW FOR 5 MIN/3500 PSI HIGH FOR 30 MIN EACH -RIG UP TO TEST LINER N CEMT -TEST APPROVED BY BP WTL 21:00 - 00:00 3.00 PERF 13,448.00 INTI INSTALL DUTCH RISER PRE-JOB SAFETY MEETING WITH RIG CREWAND SLB E-LINE UNIT -INSTALL SLB PRESSURE CONTOL EQUIPMENT -TEST 250 LOW/3500 HIGH PSI FOR 5 MINUTES EACH -PRESSURE TEST PACKOFF WITH DUMMY ROD 6/6/2014 00:00 - 02:00 2.00 PERF N CEMT 13,448.00 INTI SLB SUPERIVISOR AND WELLS GROUP WSL NOTIFIED RIG WSL OF THE E-LINE PACKOFF WILL ONLY HOLD 500 PSI WITH E-LINE INSTALLED ON CURRENT TRUCK DUE TO LINE BEING NEW AND NOT VERY I"SEASONED" -DISCUSS PLAN FORWARD WITH ODE RIG DOWN SLB E-LINE IN PREPARATION TO CHANGE OUT TRUCKS WITH A SMALLER MORE"SEASONED"LINE. 1-DECISION WAS CONCLUDED TO PRESSURE TEST PACKOFF WITH E-LINE INSTALLED ON CURRENT TRUCK -SLB INSTALLED HEAD ON ELINE 02:00 - 03:30 1.50 PERF N WAIT 13,448.00 INTI MOBILIZE SCHLUMBERGER PACK OFF BACK UP TO THE FLOOR TO PRESSURE TEST WAIT ON SLB TO OBTAIN PARTS FOR TEST ;FROM SHOP 03:30 - 04:30 1.00 PERF N CEMT 13,448.00 INTI MOBILIZE SLB EQUIPMENT TO THE RIG FLOOR -RIG UP TO PRESSURE TEST PACK OFF 04:30 - 05:00 0.50 PERF N CEMT 13,448.00 INTI 1 PRESSURE TEST SCHLUMBERGER PACK OFF 250 PSI LOW/800 TO 1800 PSI HIGH FOR 5 'MIN EACH IN 250 PSI INCREMENTS -TEST PASSED PREDETERMINED CRITERIA 05:00 - 05:30 0.50 PERF N CEMT 13,448.00 INTI RIG UP SLB E-LINE -BREAK PACK OFF AT QUICK TEST SUB, REMOVE LINE SECTION AND HEAD USED TO TEST -RIG UP SLB SHEAVES,BRING LINER TO 1 FLOOR AND RUN THROUGH SHEAVES Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 48 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 1 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay — Site:PB DS 18 {, Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM I Rig Release: Rig Contractor:PARKER DRILLING CO. I UVW:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 11:30 6.00 PERF N HMAN 13,448.00 INTI I REHEAD ELINE -ELINE WAS NOT RUN THROUGH PACK OFF ION ORIGINAL INSTALL '-CUT OFF ELINE HEAD,THREAD THROUGH PACK OFF AND REHEAD ELINE -SIMOPS:RIG DOWN SHEAVE AT RIG FLOOR AND LAY DOWN 5"DRILL PIPE OFFLINE 11:30 - 13:30 2.00 PERF N CEMT 13,448.00 INTI BRING ELINE HEAD TO THE RIG FLOOR AND MAKE UP TOOLS 13:30 - 14:00 0.50 PERF N CEMT 13,448.00 INTI 1PJSM ON ARMING FIRING HEAD. I-ARM FIRING HEAD AND MAKE UP PERF GUNS 14:00 - 18:00 4.00 PERF N CEMT 13,448.00 INTI RUN IN THE HOLE WITH SLB ELINE 18:00 - 20:00 2.00 PERF N CEMT 13,448.00 INTI FIRE PERF GUN -SHOT INTERVAL 13,135 TO 13,140' -MONITOR WELL AFTER SHOOTING PERFS= ISTATIC -POOH WITH ELINE 20:00 - 21:00 1.00 PERF N CEMT 13,448.00 INTI PERFORM INJECTIVITY TEST 1-ESTABLISH INJECTION RATE AS FOLLOWS: -1 BPM=400 PSI,2 BPM=500 PSI,3 BPM= 580 PSI,4 BPM=625 PSI -34 BBLS PUMPED,15.6 BBLS BLED BACK 21:00 - 22:30 1.50 PERF N CEMT 13,448.00 INTI RIG DOWN SLB ELINE AND REMOVE DUTCH RISER 22:30 - 23:00 0.50 PERF N CEMT 13,448.00 INTI CLEAN AND CLEAR RIG FLOOR 23:00 - 00:00 1.00 CEMT N CEMT 13,448.00 INTI INSTALL PS-21 SLIPS 1-MAKE UP SIDE ENTRY SUB TO FOSV'S 6/7/2014 00:00 - 01:00 1.00 CEMT N CEMT 13,448.00 INTI PICKUP AND MAKE UP FAS DRILL COMPOSITE CEMENT RETAINER -8 SHEAR PINS RATED @ 5K EACH=40K TO SHEAR I-FINISH MAKING UP TIW VALVES TO SIDE ENTRY SUB FOR CEMENT JOB 01:00 - 12:00 11.00 CEMT N CEMT 13,448.00 INTI TRIP IN THE HOLE WITH CEMENT RETAINER FROM SURFACE TO 13270'MD -MONITOR DISPLACEMENT ON TRIP TANKS BREAK CIRCULATION EVERY 1000'FOR THE FIRST 5000' I 116 GPM,317 PSI I-MUD WEIGHT 10.6 IN/OUT -PUW=208K,SOW=106K AT 13146'MD 12:00 - 13:00 1.00 CEMT N CEMT 13,448.00 INTI I SPOT 16 PPG PILL ESTABLISH CIRCULATION RATES AS FOLLOWS: -1 BPM=460 PSI -2 BPM=620 PSI -3 BPM=785 PSI ' 1-4 BPM=935 PSI -5 BPM=1300 PSI 13:00 - 13:30 0.50 CEMT N CEMT 13,448.00 INTI SET CEMENT RETAINER AT 13110'MD j-25 RIGHT HAND TURNS,PULL 56K OVER TO i I i 264K,SET 20K DOWN TO 98K TO VERIFY SET -35 RIGHT HAND TURNS TO EXTEND STINGER 13.30 - 1,400 0.50 CEMT N CEMT 13,448.00 INTI i OBTAIN INJECTIVITY RATES AS FOLLOWS: -1 BPM=420 PSI 1 -2BPM=720PSI 3 BPM=910 PSI -4 BPM=1140 PSI Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 49 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 14:30 0.50 CEMT N CEMT 13,448.00 INTI TEST ANNULUS 250 PSI LOWAND 1000 PSI HIGH FOR 5 MINUTES EACH 14:30 - 17:00 2.50 CEMT N CEMT 13,448.00 INTI CIRCULATE BOTTOMS UP -210 GPM,1234 PSI -OBTAIN CHOKE PRESSURE PARAMETERS FOR CEMENT JOB 17:00 - 17:30 0.50 CEMT N CEMT 13,448.00 INTI RIG UP CEMENT HEAD AND HOSE 17:30 - 20:30 3.00 CEMT N CEMT 13,448.00 INTI PJSM WITH SLB,CH2,BP WSL,AND RIG CREW ON CEMENT SQUEEZE JOB FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOWAND 4500 PSI HIGH FOR 5 MINUTES EACH -PUMP 30 BBLS OF 12.0 PPG MUDPUSH II SPACER AT 3 BPM -PUMP 40 BBLS OF 15.8 PPG NEAT SLURRY AT 3 BPM,20 BBLS CONTAINING CEMNET PUMP 20 BBLS OF 12.0 PPG MUDPUSH II -PERFORM DISPLACEMENT WITH SLB USING 10.6 PPG LSND -PUMP 47 BBLS AT 3.5 BPM,ICP 764 PSI,FCP 1141 PSI STING INTO RETAINER AND START INJECTION -PUMP 43 BBLS(30BBL OF MUD PUSH AND 1OBBL OF MUD)AT 3.5 BPM,ICP 821 PSI,FCP 1114 PSI,HELD 300 PSI WITH NO PRESSURE BLEEDOFF -PUMP 10 BBLS AT 3.2-3 BPM,ICP 1107 PSI, 1074 PSI,HELD 400 PSI WITH NO BLEEEDOFF -PUMP 10 BBLS AT 2.5 BPM,ICP 1008 PSI, 1080 PSI,HELD 570 PSI WITH NO BLEEEDOFF WHILE PULLING OUT OF CEMENT RETAINER -110 BBLS TOTAL DISPLACEMENT -MONITOR WELL AFTER UNSTINGING FROM RETAINER,ALL INDICATIONS OF RETAINER VALVE HOLDING -HELD 800 PSI ON BACK SIDE THROUGHOUT JOB UNTIL STINGING INTO CEMENT RETAINER 20:30 - 21:00 0.50 CEMT N CEMT 13,448.00 INTI UNSTING FROM CEMENT RETAINER AND LAY DOWN SINGLE AND CEMENT HEAD -RACK BACK 5 STANDS FROM 13087'TO 12709'MD PUW=200K AT 13110' 21:00 - 23:00 2.00 CEMT N CEMT 13,446.00 INTI DROP WIPER BALL AND PUMP WALNUT PILL -DROP SECOND WIPER BALL -CIRCULATE SWEEP AROUND 500 GPM AT 2600 PSI --2 BBL OF CONTAMINATED CEMENT AND 20 BBL OF MUD PUSH BACK TO SHAKERS AT BOTTOMS UP 23:00 - 00:00 1.00 CEMT N CEMT 13,448.00 INTI POOH ON ELEVATORS FROM 12907'MD TO 11380'MD -MONITOR WELL FOR 10 MINUTES -PUMP DRY JOB AND BLOW DOWN TOP DRIVE -MW IN/OUT=10.6 PPG -PUW=200K AT 12709' Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 50 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/me:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UVN:500292118100 Active datum:18-116©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/8/2014 00:00 - 07:00 7.00 CEMT N CEMT 13,448.00 INTI 'POOH ON ELEVATORS FROM 11380'MD TO SURFACE -MONITOR HOLE FILL ON TRIP TANKS -MUD WEIGHT 10.6 IN/OUT MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING LAST 10 STANDS;STATIC -LAY DOWN HALLIBURTON RUNNING TOOL 07:00 - 07:30 0.50 CEMT N CEMT 13,448.00 INTI CLEAN AND CLEAR RIG FLOOR -SERVICE RIG FLOOR EQUIPMENT 07:30 - 10:00 2.50 CEMT N CEMT 13,448.00 ' INT1 i PICKUP CLEAN OUT BHA WITH 6-1/8"MILL TOOTH BIT TO 581'MD -MUD WEIGHT 10.6 PPG IN/OUT 10:00 - 20:00 10.00 CEMT N CEMT 13,448.00 INTI RIH ON ELEVATORS WITH 6-1/8"CLEAN OUT BHA FROM 581'TO 12579'MD -BREAK CIRCULATION EVERY 2000'-116 'GPM,200 PSI -MUD WEIGHT 1,0.6 PPG IN/OUT 20:00 - 20:30 0.50 CEMT P INTI RIG EVACUATION DRILL WITH CREW,THIRD PARTY CONTRACTORS AND VISITORS -AFTER ACTION REVIEW 120:30 - 22:00 1.50 CEMT N CEMT 13,448.00 INTI WASH DOWN FROM 12579'MD TO 13090'MD -300 GPM,2100 PSI -TAG CEMENT AND SET DOWN 15K AT 13090' MD 22:00 - 00:00 2.00 CEMT N CEMT ' 13,448.00 INTI 1 DRILL CEMENT FROM 13090'MD TO 13180' MD(7983'TVD) -300 GPM, 2180 PSI ON,2100 PSI OFF -80 RPM,11K TORQUE ON,9-10K TORQUE OFF -PU 180K,SO 96,ROT 130K -WOB 4-15K -BACKREAM 90'PRIOR TO CONNECTIONS -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT -DRILLED THROUGH CEMENT RETAINER ON DEPTH,OBSERVED HARD CEMENT FROM 13110'MD TO 13,152'MD,DIDN'T SEE ANY CEMENT BETWEEN 13152'MD AND 13299'MD WHERE WE TAGGED UP ON LAST CLEANOUT RUN BEFORE THE SQUEEZE JOB. SPR'S:13,090'MD(7909'ND)MW=10.6 PPG. '#1 MP-20/30 SPM=605/775 PSI #2 MP-20/30 SPM=600/775 PSI 6/9/2014 00:00 - 02:00 2.00 CEMT N CEMT I 13,448.00 INTI DRILL CEMENT FROM 13180'MD TO 13326' MD -466 GPM, 3974 PSI ON,3950 PSI OFF -80 RPM,11K TORQUE ON,9-10K TORQUE OFF -PU 235K,SO 111,ROT 133K -WOB 4-15K BACKREAM 90'PRIOR TO CONNECTIONS '-MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT -PUMP SWEEP LAST 10'OF STAND-50% INCREASE IN CUTTINGS OBSERVED AT SURFACE -CLEAN OUT TO 13326' -LOW PUMP RATE DUE TO HIGH PUMP • PRESSURE -CALCULATED ECD AT 466 GPM=12.7 EMW Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 51 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64.50usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 02:00 - 03:00 1.00 CEMT N CEMT 13,448.00 INTI •CIRCULATE HOLE CLEAN -PUMP 40 BBL HIGH VIS SWEEP-OBSERVED 150%INCREASE IN CUTTINGS AT SURFACE '466 GPM,3840 PSI 80 RPM,11KTORQUE SPR'S:13,326'MD MW=10.6 PPG. #1 MP-20/30 SPM=508/669 PSI #2 MP-20/30 SPM=470/662 PSI 03:00 - 10:00 7.00 CEMT N I CEMT 13,448.00 INTI I POOH ON ELEVATORS FROM 13326'MD TO 582'MD 1-MONITOR WELL 10 MINUTES PRIOR TO POOH;STATIC • -MONITOR HOLE FILL ON TRIP TANKS I-MUD WEIGHT 10.6 IN/OUT _ -PUW=238K,SOW=111K AT 13326'MD 10:00 - 11:30 1.50 CEMT N CEMT 13,448.00 INTI LAY DOWN BHA -STAND BACK HWDP -LAY DOWN DRILL COLLARS LAY DOWN BAKER TOOLS PER BAKER REP 11:30 - 12:00 0.50 CEMT N CEMT 13,448.00 INTI I CLEAN AND CLEAR RIG FLOOR i I -SERVICE FLOOR EQUIPMENT 12:00 - 12:30 0.50 CEMT N CEMT 13,448.00 INTI I MOBILIZE SCHLUMBERGER ELINE TOOLS TO •THE RIG FLOOR 12:30 - 14:00 1.50 CEMT N CEMT 13,448.00 INTI PJSM WITH ALL ESSENTIAL PERSONNEL ON RIGGING UP SLB ELINE MAKE UP AND RUN USIT-CBL-TUFFTRAC TOOLSTRING TEST TOOLSTRING 14:00 - 20:30 j 6.50 EVAL N CEMT 13,448.00 INTI I RIH ON TRACTOR TO BOTTOM AND LOG INTERVAL FROM 13315'MD TO 11400'MD -SURVEYS INDICATED GOOD CEMENT • BEHIND 7"LINER -POOH WITH ELINE 20:30 - 21:30 I 1.00 EVAL N CEMT 13,448.00 : INTI RIG DOWN ELINE -LAY DOWN USIT-CBL-TUFFTRAC TOOLSTRING -RIG DOWN ELINE EQUIPMENT 21:30 - 22:00 0.50 DRILL N CEMT 13,448.00 INTI CLEAN AND CLEAR RIG FLOOR -PJSM ON PICKING UP DRILLING BHA 22:00 - 00:00 2.00 DRILL P INTI PICK UP 6-1/8"DRILLING BHA PER BAKER DIRECTIONAL DRILLER -CHANGE OUT JARS -ADJUST BEND IN MOTOR TO 1.5° -REMOVEAUTOTRAKFROM ONTRAKAND INSTALL STOP SUB 6/10/2014 00:00 - 01:00 1.00 DRILL P ' INTI PICK UP 6-1/8"DRILLING BHA .-PICK UP AND DOWNLOAD MWD TOOLS 01:00 - 02:30 1.50 DRILL P INTI PICKUP ONE JOINT ON NON MAG COLLARS AND CLEAR THE RIG FLOOR -PJSM,TIME,DISTANCE,AND SHIELDING, LOAD NUKES -PICK UP REMAINING BHA COMPONENTS 02:30 - 13:00 10.50 DRILL P INTI RIH WITH 6-1/8"DRILLING BHA FROM 1796' MD TO 13150'MD -PICKUP 39 JTS OF 4"DP OUT OF PIPE i SHED 1-BREAK CIRCULATION EVERY 2000'-116 GPM,550 PSI -MUD WEIGHT IN/OUT 10.6 PPG Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 52 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) •13:00 - 14:30 1.50 DRILL P INTI SLIP AND CUT DRILLING LINE -HANG OFF BLOCK -SLIP AND CUT 8 WRAPS -RECALIBRATE BLOCKS 14:30 - 15:00 0.50 DRILL P INTI I RIH WITH 6-1/8"DRILLING BHA FROM 13150' MD TO 13326'MD -MUD WEIGHT IN/OUT 10.6 15:00 - 17:30 2.50 DRILL P INTI DISPLACE WELL FROM 10.6 PPG LSND TO 8.6 PPG SOLIDS FREE QUICKDRIL-N FLUID 17:30 - 18:30 j 1.00 DRILL P INTI PERFORM NEGATIVE PRESSURE TEST ON 7" LINER LAP -MONITOR WELL FOR 30 MINUTES -WELL STATIC ;18:30 - 00:00 5.50 DRILL P INTI DRILL OUT 7"SHOE TRACK AND 20'OF NEW HOLE FROM 13326'MD TO 13455'MD -300 GPM, 1870 PSI ON,1790 PSI OFF -50 RPM,11K TORQUE ON,10K TORQUE OFF -PU 188K,SO 130K,ROT 148K WOB 11K -ECD:ACTUAL=11.89 PPG,CALC=11.62 PPG -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -JAR HOURS=1 HR -ACTUAL ROTATE TIME=1 HR SPR'S:13,326'MD(8102'TVD)MW=8.8 PPG. #1 MP-20/30 SPM=515/640 PSI #2 MP-20/30 SPM=520/640 PSI SIMOPS:LAY DOWN 40 STANDS OF 5"DRILL PIPE OFFLINE 6/11/2014 00:00 - 00:30 0.50 DRILL P INTI FINISH DRILLING OUT SHOE TO 13468'MD -FLOW CHECK WELL 10 MIN STATIC -PULL BACK INTO THE SHOE 00:30 - 01:30 1.00 DRILL P INTI PULL UP TO 13448'MD DIFFICULTY PULLING BACK INTO THE SHOE -30K OVER PULL -300 GPM, 1800 PSI ON -50 RPM,15K TORQUE ON,13K TORQUE OFF -WORK BHA BACK THROUGH SHOE,WORK FLOAT EQUIPMENT 2 TIMES -AFTER CLEAN UP NO OVER PULL EXPERIENCED ROTATE 60 RPM 10K-13K TQ @ 1790 PSI CLEAN PASS 01:30 - 03:30 2.00 CONDHL P INTI CIRCULATE BOTTOMS UP X 1.5 -300 GPM, 1790 PSI ON -20 RPM,10K TORQUE ON,7K TORQUE OFF -WORK PIPE 1 FULL STAND -PUMP HIGH VIS SWEEP BROUGHT BACK 50%INCREASE IN CUTTINGS NOTE: 3K REDUCTION IN TQ AFTER CBU FROM 10KTO7K 03:30 - 04:30 1.00 EVAL P INTI RIG UP AND PERFORM FIT -MUD WEIGHT:8.6 PPG,8209'TVD,13468'MD -PUMP 1.2 BBLS TO 518 PSI,BLEED BACK 1.2 BBLS -FIT EMW=9.8 PPG RECIVED APRROVAL TO PROCEED BY ODE Printed 7/21/2014 10:22.41 AM North America-ALASKA-BP Page 53 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 04:30 - 05:30 1.00 DRILL P PROD1 CIRCULATE AROUND EP MUD LUBE SWEEP -WORK PIPE 30'STAYING BOTTOM UNTIL � SWEEP IS SPOTTED -ENCOUNTERED MOTOR STALL AT 13,455', PICK UP OFF BOTTOM AND WORK THROUGH AREA,MOTOR STALL AGAIN AT 13460', SUSPECT PIECE OF CASING SHOE WAS STALLING MOTOR -SET DOWN 3K AT 60 RPM,10-13K TQ,DRILL _ UP AND WORK THROUGH SHOE 05:30 - 12:00 6.50 DRILL P PROD1 DRILL 6.125"INTERMEDIATE HOLE FROM 13468'MD TO 13585'MD(8320'TVD) -300 GPM, 1947 PSI ON,1850 PSI OFF -PU 205K,SO 130K -WOB 10-18K -SURVEY EVERY-30 FT -ACTUAL ROTATE TIME=0 HRS -ACTUAL SLIDE TIME=4.3 HRS -JAR HOURS=4.6 HRS -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -SLIDE TO BUILD ANGLE,SLOW ROP [THROUGH SHUBLIK FORMATION SPR'S:13,535'MD(8209'TVD)MW=8.6 PPG. #1 MP-20/30 SPM=825/1125 PSI #2 MP-20/30 SPM=800/1130 PSI 12:00 - 18:00 6.00 DRILL P PROD1 DRILL 6.125"INTERMEDIATE HOLE FROM 13585'MD TO 13763'MD(8414'TVD) '-300 GPM, 1960 PSI ON,1860 PSI OFF 70 RPM,11-13K TORQUE ON,11K TORQUE OFF -PU 225K,SO 122K,ROT 148K -WOB 7-14K -ECD:ACTUAL=9.51 PPG,CALC=9.5 PPG 1-SURVEY EVERY-30 FT -ACTUAL ROTATE TIME=0.6 HRS -ACTUAL SLIDE TIME=2.6 HRS -JAR HOURS=7.8 HRS -BACKREAM 90 FT PRIOR TO CONNECTIONS -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -FLOW CHECK AT EACH CONNECTION ' I SIMOPS:BUILD 34 STANDS OF 4"DRILL PIPE OFFLINE FROM 13:30 TO 17:00 Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 54 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 DRILL P PROD1 DRILL 6.125"INTERMEDIATE HOLE FROM 13763'MD TO 13941'MD(8500'TVD) -300 GPM, 1960 PSI ON,1860 PSI OFF -70 RPM,11-13K TORQUE ON,11K TORQUE OFF -PU 225K,SO 122K,ROT 148K -WOB 10-12K -ECD:ACTUAL=9.52 PPG,CALC=9.51 PPG -SURVEY EVERY-30 FT -ACTUAL ROTATE TIME=2.8 HRS -ACTUAL SLIDE TIME=0.5 HRS JAR HOURS=10.4 -BACKREAM 90 FT PRIOR TO CONNECTIONS -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -FLOW CHECK AT EACH CONNECTION SPR'S:13,921'MD(8490'TVD)MW=8.6 PPG. #1 MP-20/30 SPM=503/627 PSI #2 MP-20/30 SPM=503/647 PSI 6/12/2014 00:00 - 06:00 6.00 DRILL P PROD1 DRILL 6.125"INTERMEDIATE HOLE FROM 13941'MD TO 14,225'MD(8635'TVD) -300 GPM, 2100 PSI ON,1950 PSI OFF -70 RPM,14-15K TORQUE ON,14KTORQUE OFF -PU 245K,SO 115K,ROT 148K -WOB 15K -ECD:ACTUAL=9.6 PPG,CALC=9.5 PPG -SURVEY EVERY-90 FT -BACKREAM 90 FT PRIOR TO CONNECTIONS -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -FLOW CHECK AT EACH CONNECTION 06:00 - 12:00 6.00 DRILL P PROD1 DRILL 6.125"INTERMEDIATE HOLE FROM 14225'MD TO 14425'MD(8728'TVD) -300 GPM, 2050 PSI ON,1950 PSI OFF -70 RPM,14K TORQUE ON,14K TORQUE OFF -PU 260K,SO 110K,ROT 145K -WOB 15K -ECD:ACTUAL=9.63 PPG,CALC=9.5 PPG -SURVEY EVERY-90 FT -ACTUAL ROTATE TIME=9.8 HRS -ACTUAL SLIDE TIME=0 HRS -ACTUAL JAR HOURS=20.6 HRS -BACKREAM 90 FT PRIOR TO CONNECTIONS -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -INTERMITENT HARD SPOTS FROM 14225' -LOSS RATE 5 BBLS/HOUR,57 BBLS LOST IN 12 HOURS SPR'S:14,391'MD(8713'TVD)MW=8.6 PPG. #1 MP-20/30 SPM=505/650 PSI #2 MP-20/30 SPM=490/640 PSI 12:00 - 14:30 2.50 DRILL P PROD1 DRILL 6.125"INTERMEDIATE HOLE FROM 14425'MD TO 14466'MD(8747'TVD) -300 GPM, 2050 PSI ON,1950 PSI OFF -70 RPM,14K TORQUE ON,14K TORQUE OFF -PU 300K,SO 120K,ROT 150K -WOB 14-15K -ECD:ACTUAL=9.65 PPG,CALC=9.38 PPG -ACTUAL ROTATE TIME=2.5 HRS -ACTUAL SLIDE TIME=0 HRS -ACTUAL JAR HOURS=23.1 HRS -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 55 of 74 Operation Summary Report - - -- -_ _ _-- --- - - -- -__.--- -- ------ - ---- ......------------- Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To i Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 16:00 1.50 DRILL P PROD1 PUMP OUT OF THE HOLE FROM 14466'TO 13895' -MONITOR WELL FOR 10 MINUTES -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -300 GPM,1950 PSI AT 14400' -PU 300K,SO 120K AT 14466' 16:00 - 19:00 3.00 STKOH N DPRB ! PROD1 BEGIN TRENCHING OPERATION FROM 13875' MD TO 13878'MD(8469'TVD) -315 GPM,2100 PSI ON,1910 PSI OFF -PU 281K,SO 112K -WOB 2K -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -18:00 HRS-AOGCC WAS GIVEN 24 NOTICE OF UPCOMING BOPE TEST 19:00 - 00:00 5.00 STKOH N DPRB PROD1 TIME DRILL 6.125"OPEN HOLE SIDETRACK FROM 13875'MD TO 13878'MD(8469'TVD) -300 GPM, 1910 PSI ON,1910 PSI OFF -PU 281K,SO 112K -WOB 2K -ECD:ACTUAL=9.6 -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT SPR'S:13,875'MD(8468'ND)MW=8.6 PPG. #1 MP-20/30 SPM=PUMP DOWN FOR REPAIRS #2 MP-20/30 SPM=530/665 PSI 6/13/2014 00:00 - 09:00 9.00 STKOH N DPRB j PROD1 TIME DRILL 6.125"OPEN HOLE SIDETRACK FROM 13,878'MD TO 13,902'MD(8481'ND) -300 GPM, 1950 PSI ON,1900 PSI OFF -PU 265K,SO 115K -WOB 11K -ECD:ACTUAL=9.6 -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -ATTEMPT OPEN HOLE SIDETRACK -TURN OFF PUMPS AND ATTEMPT TO SET WEIGHT DOWN TO VERIFY OPEN HOLE SIDE TRACK. -WENT PAST DEPTH OF SPEED BUMP INTO OPEN HOLE. SURVEY BEFORE LEAVING BOTTOM. -ACTUAL SLIDE TIME=7.5 HRS. -JAR HOURS=37.87 HRS. I I SPR'S:13,900'MD(8481'ND)MW=8.6 PPG. #2 MP-20/30 SPM=530/665 PSI 09:00 - 10:00 1.00 STKOH P PROD1 PUMP OUT OF THE HOLE FROM 13,902'MD TO 13,446'MD. -PU 235K,SO 115K -300 GPM;1850 PSI NO TIGHT HOLE NOTED. 10:00 - 12:00 2.00 STKOH P PROD1 PULL OUT OF THE HOLE ON ELEVATORS FROM 13,446'MD TO 13,160'MD -MONITOR WELL FOR 5 MIN;STATIC. -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT. -NOTICED HOLE FILL NOT CORRECT. -FLOW CHECK WELL-STATIC. -PUMP OUT OF THE HOLE TO 12,776'MD. -300 GPM;1780 PSI. -FLOW CHECK WELL-STATIC. -PUMP DRY JOB. -PULL ON ELEVATORS TO 12,650'MD. Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 56 of 74 Operation Summary Report Common Well Name:16-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292118100 Active datum 18-11B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 15:00 3.00 STKOH N DPRB 12,650.00 PROD1 OBSERVED GAS BREAKING OUT IN BELL NIPPLE AND ELEVATED LEL LEVELS WITH HANDHELD GAS MONITOR. -69 PPM. SHUT-IN WELL AND MADE NOTIFICATIONS. ALLOW PRESSURES TO STABILIZE: -SICP=228 PSI;SIDPP=33 PSI;NO PIT GAIN NOTED. -DISCUSS PLAN FORWARD WITH ODE,WTL, AND NS SUPERINTENDENT. 15:00 - 18:30 3.50 STKOH N DPRB 12,650.00 PROD1 CIRCULATE WELL THROUGH THE CHOKE AND MUD GAS SEPERATOR. -KILL RATE=30 SPM. -STARTING PRESSURES: -DRILL PIPE=800 PSI;CASING=145 PSI. -FINAL PRESSURES: -DRILL PIPE=800 PSI;CASING=140 PSI. 18:30 - 19:00 j 0.50 STKOH N DPRB 12,650.00 ' PROD1 MONITOR WELL THROUGH THE CHOKE -STATIC. -DISCUSS WITH WTL AND RECEIVE AUTHORIZATION TO OPEN WELL. 19:00 - 20:00 1.00 STKOH N DPRB 12,650.00 PROD1 RUN IN THE HOLE WITH 6-1/8"DRILLING ASSEMBLY TO 7"LINER SHOE AT 13,446'MD. 20:00 - 21:30 1.50 STKOH N DPRB 12,650.00 PROD1 CIRCULATE BOTTOMS UP AT 13,446'MD. -150 GPM;875 PSI. -10 RPM,12K FT-LBS TORQUE. ' -RECIPROCATING PIPE 60'. 21:30 - 23:00 1.50 STKOH- N DPRB j 12,650.00 PROD1 OBSERVED A PIT GAIN WHILE CIRCULATING •BOTTOMS UP. SHUT DOWN AND FLOW CHECK WELL. OBSERVED GAS BREAKING OUT IN BELL NIPPLE AND ELEVATED LEL LEVELS WITH HANDHELD GAS MONITOR. -62 PPM. SHUT-IN WELL AND MADE NOTIFICATIONS. -ALLOW PRESSURES TO STABILIZE: -SICP=66 PSI;SIDPP=33 PSI;4.7 BBL PIT GAIN NOTED. -DISCUSS PLAN FORWARD WITH ODE,WTL, AND NS SUPERINTENDENT. 23:00 - 00:00 1.00 STKOH N DPRB 12,650.00 PROD1 CIRCULATE WELL THROUGH THE CHOKE AND MUD GAS SEPERATOR. -KILL RATE=30 SPM. -STARTING PRESSURES: -DRILL PIPE=780 PSI;CASING=70 PSI. 6/14/2014 00:00 - 02:30 2.50 STKOH N DPRB 12,650.00 PROD1 CIRCULATE WELL THROUGH THE CHOKE AND MUD GAS SEPERATOR. -KILL RATE=30 SPM. i -STARTING PRESSURES: -DRILL PIPE=800 PSI;CASING=145 PSI. -FINAL PRESSURES: -DRILL PIPE=769 PSI;CASING=10 PSI. Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 57 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date. X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 05:00 2.50 STKOH N DPRB 12,650.00 PROD1 MONITOR WELL THROUGH THE CHOKE -STATIC. HAD AUTHORIZATION FROM WTL TO OPEN WELL IF STATIC. OPEN ANNULAR PREVENTOR AND AND MONITOR WELL. -STATIC. CIRCULATE BOTTOMS UP -155 GPM;850 PSI. -20 RPMS,K FT-LBS TORQUE RECIPROCATING PIPE 60'. 1-MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT. 05:00 - 08:30 3.50 STKOH N DPRB 12,650.00 PROD1 MONITOR WELL FOR FLOW -STATIC. CIRCULATE BOTTOMS UP 1.2 TIMES -194 GPM,1140 PSI -20 RPM,10K TORQUE -RECIPROCATING PIPE 50' -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT. 08:30 - 10:30 2.00 STKOH P PROD1 PUMP OUT OF HOLE FROM 13440'MD TO 12401'MD -MONITOR WELL FOR FLOW -STATIC -155 GPM,825 PSI AT 13440'MD -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT. 10:30 - 19:00 8.50 STKOH P PROD1 PULL OUT OF HOLE ON ELEVATORS FROM 12401'MD TO 11794'MD -MONITOR WELL FOR FLOW -STATIC -DISPLACEMENT CORRECT -PUMP DRY JOB -CONTINUE TO PULL OUT OF HOLE FROM 11794'MD TO 1800'MD -DISPLACEMENT CORRECT 19:00 - 00:00 5.00 STKOH P PROD1 LAY DOWN 6 1/8 DRILLING BHA -MONITOR WELL FOR FLOW -STATIC -STAND BACK HWDP -REMOVE NUCLEAR SOURCES FROM MWD -DOWNLOAD MWD TOOL 6/15/2014 00:00 - 01:00 1.00 STKOH P PROD1 CLEAN AND CLEAR RIG FLOOR. 01:00 - 04:30 3.50 BOPSUR P PROD1 RIG UP TO TEST BOPE -PICK UP STACK FLUSHING TOOL AND FLUSH BOP STACK. -SUCK OUT STACK AND PULL WEAR RING. -WEAR RING HUNG UP ON DUTCH RISER LOCK-DOWN. -BACK OUT LOCK-DOWN ALL THE WAY AND PULL WEAR RING. -SET TEST PLUG. -MAKE UP TEST JOINT AND TEST MANIFOLD. 04:30 - 10:00 5.50 BOPSUR P PROD1 TEST BOPE TO 250 PSI LOW,3500 PSI FOR 5 MINUTES EACH. -TEST WITH 2-7/8"ABD 4-1/2"TEST JOINT. -COMPLETE KOOMY TEST -ALL TESTS CHARTED -TEST WITNESS WAIVED BYAOGCC REP BOB NOBLE 6/13/14 17:00HRS. 10:00 - 10:30 0.50 BOPSUR P PROD1 RIG DOWN BOPE EQUIPMENT -SET WEAR RING Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 58 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:5/1/2014 End Date: 1X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 ' Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UW:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To , Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 11:00 0.50 STKOH P PROD1 CLEAN AND CLEAR RIG FLOOR 11:00 - 13:30 2.50 STKOH P PROD1 'PICKUP 6 1/8 DRILLING ASSEMBLY#10 -PJSM FOR PICKING UP DRILLING ASSEMBLY -LOAD NUCLEAR SOURCES -SHALLOW HOLE TEST 13:30 - 18:30 5.00 STKOH P PROD1 RUN IN HOLE WITH 6 1/8 DRILLING ASSEMBLY •FROM 265'MD TO 4999'MD -FILL PIPE EVERY 2000' -115 GPM,200 PSI -DISPLACEMENT CORRECT 18:30 - 19:00 0.50 STKOH P PROD1 RUN IN HOLE WITH 6 1/8 DRILLING ASSEMBLY FROM 4999'MD TO 5186'MD -PICK UP HWDP I -PICK UP JAR 19:00 - 20:30 1.50 STKOH P PROD1 RUN IN HOLE WITH 6 1/8 DRILLING ASSEMBLY FROM 5186'MD TO 8483'MD -FILL PIPE EVERY 2000' -115 GPM,300 PSI -DISPLACEMENT CORRECT .20:30 - 21:00 0.50 STKOH P PROD1 SERVICE RIG 21:00 - 00:00 3.00 STKOH N RREP PROD1 TROUBLE SHOOT IRON DERRICKMAN 6/16/2014 00:00 - 02:00 2.00 STKOH ! N RREP ! 8,483.00 PROD1 CONTINUE TO TROUBLESHOOT IDM. -MECHANIC AND ELECTRICIAN WORKING WITH MFG. UNABLE TO GET IDM TO PICK UP DRILL PIPE. 02:00 - 03:30 1.50 STKOH N RREP 8,483.00 PROD1 SWING IDM OUT AND PIN IN STORAGE POSITION. PIN BOARD IN PLACE. 03:30 - 04:00 0.50 STKOH ; N RREP 8,483.00 PROD1 CHANGE OUT BX ELEVATORS FOR MANUAL .ELEVATORS. 04:00 - 07:00 3.00 STKOH P PROD1 CONTINUE TO RUN IN HOLE WITH 6 1/8 • • DRILLING ASSEMBLY FROM 8483'MD TO 13,419'MD •-FILL PIPE EVERY 2000' -DISPLACEMENT CORRECT 07:00 - 08:00 1.00 STKOH P PROD1 CIRCULATE AT 13419'MD -155 GPM -830 PSI -SPR'S:13,419'MD(8201'TVD)MW=8.6 PPG. #1 MP- 20/30 SPM=505/640 #2 MP-20/30 SPM=500/630 08:00 - 10:30 2.50 STKOH N DPRB PROD1 OBSERVED GAS BREAKING OUT IN BELL NIPPLE AND ELEVATED LEL LEVELS WITH HANDHELD GAS MONITOR. -36 PPM. -SHUT-IN WELLAND MADE NOTIFICATIONS. -ALLOW PRESSURES TO STABILIZE: -SICP=124 PSI;SIDPP=63 PSI;2.5 BBL PIT GAIN NOTED. • -DISCUSS PLAN FORWARD WITH ODE,WTL, AND NS SUPERINTENDENT. Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 59 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) • Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 13:30 3.00 STKOH N DPRB PROD1 CIRCULATE WELL THROUGH THE CHOKE AND MUD GAS SEPERATOR. -KILL RATE=30 SPM. -STARTING PRESSURES: -DRILL PIPE=790 PSI;CASING=118 PSI.- KILL RATE=30 SPM. -FINAL PRESSURES: -DRILL PIPE=683 PSI;CASING=0 PSI. 13:30 - 14:30 1.00 STKOH P PROD1 WASH DOWN FROM 13446'MD TO 13888'MD -300 GPM;200 PSI 14:30 - 16:30 2.00 STKOH P PROD1 MAD PASS FROM 13711'MD TO 13900'MD -DOWN LINK TO AUTOTRAK -NO GAS NOTED AT BOTTOMS UP. -FLOW CHECK AT EACH CONNECTION. -FLOW CHECK AFTER MAD PASS STATIC. 16:30 - 19:00 2.50 STKOH P PROD1 OPEN HOLE SIDETRACK -COMMENCE TRENCHING OPERATIONS FROM 13868'MD TO 13888'MD 19:00 - 00:00 5.00 STKOH P PROD1 TIME DRILL OPEN HOLE SIDETRACK FROM 13888'MD TO 13892'MD(8476'TVD) -252 GPM,1630 PSI ON BOTTOM,1630 PSI OFF BOTTOM -120 RPM,14-15K TORQUE ON BOTTOM, 14-15K TORQUE OFF BOTTOM -P/U WEIGHT 206K,S/O WEIGHT 117K,ROT WEIGHT 142K -WOB 0 K -ECD ACTUAL 9.56 PPG,CALCULATED 9.59 PPG -MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT -LOSS RATE=2 BPH SPR'S:13,891'MD(8476'TVD)MW=8.6 PPG. #1 MP- 20/30 SPM=530/700 #2 MP-20/30 SPM=520/680 6/17/2014 00:00 - 12:00 12.00 STKOH P PROD1 TIME DRILL OPEN HOLE SIDETRACK FROM 13,892'MD TO 13,951'MD(8,512'TVD) -252 GPM,1630 PSI ON BOTTOM,1620 PSI OFF BOTTOM -120 RPM,15K TORQUE ON BOTTOM,16K TORQUE OFF BOTTOM -P/U WEIGHT 206K,S/O WEIGHT 117K,ROT WEIGHT 142K -WOB 0K-4K -ACTUAL ROTATING TIME=11.9 HRS -ACTUAL SLIDE TIME=0 HRS -JAR HRS=54-BACKREAM 90'PRIOR TO CONNECTIONS -ECD ACTUAL 9.56 PPG,CALCULATED 9.59 PPG -MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT-LOSS RATE=3 BPH. -SPR'S:13,891'MD(8,476'TVD)MW=8.6 PPG. #1 MP- 20/30 SPM=530/700 #2 MP-20/30 SPM=520/680 • Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 60 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6 1/8"PRODUCTION HOLE FROM 13,951'TO 14,470 MD(8,701'TVD) -270 GPM,1800 PSI ON BOTTOM,1750 PSI OFF BOTTOM -120 RPM,15-16K TORQUE ON BOTTOM,15K TORQUE OFF BOTTOM -P/U WEIGHT 267K,S/O WEIGHT 114K,ROT WEIGHT 147K -WOB3K-7K -ACTUAL ROTATING TIME=9.9 HRS -ACTUAL SLIDE TIME=0 HRS -JAR HRS=64.5 -BACKREAM 90'PRIOR TO CONNECTIONS -ECD ACTUAL 9.56 PPG,CALCULATED 9.59 PPG -MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT -LOSS RATE=3 BPH. -SPR'S:14,340'MD(8,677'TVD)MW=8.6 PPG. #1 MP- 20/30 SPM=570/710 #2 MP-20/30 SPM=570/715 6/18/2014 00:00 - 12:00 12.00 DRILL P PROD1 DRILL6 1/8"PRODUCTION HOLE FROM 14,470'TO 15,130'MD(8,686'TVD) -272 GPM,1800 PSI ON BOTTOM,1790 PSI OFF BOTTOM -120 RPM,15-17K TORQUE ON BOTTOM,15K TORQUE OFF BOTTOM -P/U WEIGHT 255K,S/O WEIGHT 100K,ROT WEIGHT 146K -WOB3K-10K -ECD ACTUAL 9.76 PPG,CALCULATED 9.51 PPG -SURVEY EVERY 90' -ACTUAL ROTATING TIME=8.1 HRS -ACTUAL SLIDE TIME=0 HRS -JAR HRS=70.7 -BACKREAM 90'PRIOR TO CONNECTIONS -MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT -LOSS RATE=3 BPH. -SPR'S:14,844'MD(8,692'TVD)MW=8.6 PPG. #1 MP- 20/30 SPM=545/704 #2 MP-20/30 SPM=556/692 Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 61 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) • Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) • 12:00 - 18:00 6.00 DRILL P PROD1 DRILL 6 1/8"PRODUCTION HOLE FROM 15130' TO 15,601'MD(8,673'TVD) -272 GPM,1880 PSI ON BOTTOM,1860 PSI OFF BOTTOM -120 RPM,16-17K TORQUE ON BOTTOM,16K TORQUE OFF BOTTOM -P/U WEIGHT 273K,S/O WEIGHT 102K,ROT WEIGHT 142K -WOB7K-10K -ECD ACTUAL 9.98 PPG,CALCULATED 9.73 PPG •-SURVEY EVERY 90' -ACTUAL ROTATING TIME=4.2 HRS -ACTUAL SLIDE TIME=0 HRS -JAR HRS=74.5 -BACKREAM 90'PRIOR TO CONNECTIONS -MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT -LOSS RATE=3 BPH. -SPR'S:14,844'MD(8,692'TVD)MW=8.6 PPG. #1 MP- 20/30 SPM=590/745 #2 MP-20/30 SPM=590/739 18:00 - 00:00 6.00 DRILL N DPRB 15,601.00 PROD1 PLANNED WIPER TRIP: BACK REAM OUT OF HOLE FROM 15,601'TO 14,280' -PUMP HIGH VIS SWEEP AND SPOT IN OPEN HOLE -DOWNLINK ROTARY STEERABLE TO CLOSE PADS. -MUD WT IN AND OUT 8.7 PPG -272 GPM @ 1750 PSI -120 RPM @ 16-17K FT/LBS 141K ROTATING WT -PULLING SPEED @ 800'/HR -TIGHT SPOTS @ 14,940-14,575'-14,420'. WORKED THROUGH ONE TIME 6/19/2014 00:00 - 02:30 2.50 DRILL N DPRB PROD1 BACK REAM OUT OF HOLE FROM 14,280'TO 13,450' -MUD WT IN AND OUT 8.6 PPG -272 GPM @ 1750 PSI -120 RPM @ 16-17K FT/LBS 141K ROTATING WT -PULLING SPEED @ 800'/HR 02:30 - 03:30 1.00 DRILL N DPRB PROD1 CIRCULATE BOTTOMS UP IN 7"LINER SHOE -270 GPM @ 1650 PSI 03:30 - 04:30 1.00 DRILL N DPRB PROD1 MONITOR WELL FOR ONE HOUR FOR GAS BREAKOUT/WELL STATIC 04:30 - 05:30 1.00 DRILL N DPRB PROD1 CIRCULATE BOTTOMS UP -270 gpm @ 1650 PSI 05:30 - 10:00 4.50 DRILL N DPRB PROD1 RIH FROM 13450'7"LINER SHOE TO 14460' MD -MONITOR WELL FOR 10 MINUTES -TIGHT HOLE FROM 13,450'-14,460' -REAM SPOTS AT 14,050'AND 14,405' SEVERAL TIMES -120 RPM,20K TORQUE,272 GPM@1750-2000 PSI -DETERMINE TO BE IN PILOT HOLE. CONFIRM WITH SURVEY. 10:00 - 11:00 1.00 DRILL N DPRB PROD1 CIRCULATE AND CONDITION MUD -SPOT HI-VIS SWEEP @ 14,460' -272 GPM @ 1800 PSI Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 62 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date. X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-118©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 11:00 - 13:30 2.50 DRILL N DPRB PROD1BACKREAM FROM 14,460'TO 13,584' I-272 GPM @1924 PSI,800 FPH -PU 260K,SO 103K -MUD WT IN AND OUT 8.7PPG _ 13.30 - 21:30 8.00 DRILL N DPRB PROD1 PERFORM TRENCHING OPERATIONS FROM 13,545'MD TO 13,605'MD(8,323'TVD) 1-300 GPM,1900 PSI OFF BOTTOM 1-120 RPM,14K TORQUE BOTTOM -P/U WEIGHT 215K,S/O WEIGHT 115K,ROT I WEIGHT 148K -ACTUAL ROTATING TIME=37.2 HRS -JAR HRS=77 -MUD WEIGHT 8.7 PPG IN,8.7 PPG OUT 1-TROUBLE SHOOT RSS(SIM-OPS)-LOSS OF PAD PRESSURE I i -SPR'S:13,891'MD(8,476'TVD)MW=8.6 PPG. #1 MP- 20/30 SPM=450/590 #2 MP-20/30SPM=450/590 21:30 - 00:00 2.50 DRILL N DFAL PROD1 POOH DUE TO RSS FAILURE -MUD WT.IN AND OUT 8.7PPG -MONITOR WELL FOR 10 MINUTES ON 1 BOTTOM AND AT SHOE-STATIC iPU 225K,SO 115 @ 13,517'MD -PULL OUT OF HOLE ON ELEVATORS FROM 13,517'MD TO 11,623'MD DISPLACEMENT CORRECT 6/20/2014 00:00 - 05:30 5.50 STKOH N DFAL PROD1 I CONTINUE TO POOH DUE TO RSS FAILURE -PULL OUT OF HOLE ON ELEVATORS FROM 11,623'MD TO 695'MD -DISPLACEMENT CORRECT -MONITOR WELL FOR 10 MINUTES AT BHA 695'MD =STATIC 05:30 - 09:00 3.50 STKOH N DFAL PROD1 LAY DOWN BHA -PRE JOB MEETING ON HANDING RADIO ACTIVE SOURCES AND LAY DOWN BHA 09:00 - 10:30 1.50 STKOH N DFAL PROD1 REMOVE PS 21 AND INSTALL MASTER BUSHINGS -BREAK OUT BIT 10:30 - 11:00 0.50 STKOH P PROD1 PULL WEAR RING 11:00 - 12:00 1.00 STKOH P PROD1 TEST ANNULAR PREVENTER AND CHOKE VALVE#7(AFTER SHUTTING IN ON SHUBLIK GAS) -250 PSI LOW 3500 PSI HIGH FOR 5 CHARTED MINUTES 12:00 - 13:00 1.00 STKOH P PROD1 'RIG DOWN TEST EQUIPMENT -INSTALL WEAR RING 13:00 - 13:30 0.50 STKOH N DFAL PROD1 CLEAR RIG FLOOR 13:30 - 16:00 2.50 STKOH N DFAL PROD1 MAKE UP BHA#11 -HOLD PJSM -MAKE UP NEW BIT TO BACKUP AUTOTRAK AND MWD. -LOAD SOURCES AND PROGRAM TOOL 16:00 - 00:00 8.00 STKOH N DFAL PROD1 RUN IN HOLE WITH 6 1/8"DRILLINJG ASSEMBLY FROM 266'TO 13,446' i-BREAK CURCULATION EVERY-2000'TEST MWD -100 GPM©525 PSI Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 63 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) _ (usft) 6/21/2014 00:00 - 00:30 ; 0.50 STKOH N DFAL PROD1 CIRCULATE -RECORD SLOW PUMP RATES -RECORD BASELINE ECD 00:30 - 01:00 0.50 STKOH N DFAL ! PROD1 SERVICE TOP DRIVE 01:00 - 03:00 2.00 STKOH N DFAL PROD1 DOWNLINK TO RSS TOOL 03:00 - 17:30 14.50 STKOH N DPRB PROD1 TIME DRILL 6-1/8"PRODUCTION HOLE FROM 13,603'MO TO 13,648'MD(8353'TVD) -MONITOR AT BIT INCLINATION TO CONFIRM DEVIATION -ONCE SEPERATION CONFIRMED WORKED/ REAMED HOLE JUNCTION TO CONFIRM ABILITY TO RE-ENTER NEW HOLE. -272 GPM, 1650 PSI ON,1620 PSI OFF -120 RPM,7K TORQUE ON,6K TORQUE OFF PU 180K,SO 130K,ROT 145K -ECD:ACTUAL=9.7PPG,CALC=9.6 PPG -WOB=1K -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT 17:30 - 00:00 6.50 STKOH N DPRB PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 13,648'MD TO 13,802'MD(8464'TVD) -300 GPM, 1900 PSI ON,1890 PSI OFF -120 RPM,8K TORQUE ON,7K TORQUE OFF j-PU 185K,SO 118K,ROT 145K ECD:ACTUAL=9.7 PPG,CALC=9.6 PPG -SURVEY EVERY-30 FT -WOB 3K MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT 6/22/2014 00.00 - 05 00 5.00 DRILL N DPRB PROD1 j DRILL6-1/8"PRODUCTION HOLE FROM 13,802'MD TO 13,989'MD(8681'TVD) -272 GPM, 1700 PSI ON,1623 PSI OFF,120 RPM,10K TORQUE ON,9K TORQUE OFF,3 KLBS WOB PU 185K,SO 118K,ROT 145K -ECD:ACTUAL=9.7 PPG,CALC=9.6 PPG -SURVEY EVERY-30 FT -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -UNABLE TO ACHIEVE BUILD RATES TO MEET DIRECTIONAL PLAN. DECISION TO TRIP FOR MUD MOTOR ASSEMBLY. 05 00 - 07:00 2.00 DRILL N DPRB PROD1 ,CIRCULATE BOTTOMS-UP 1 TIMES -240 GPM,1490 PSI -120 RPM,8K TORQUE -RECIPROCATE PIPE 10 FT/MIN IN 90' STROKES 07:00 - 08:00 1.00 DRILL N DPRB PROD1 i BACKREAM OUT OF THE HOLE FROM 13989' MD TO 7"LINER SHOE AT 13390'MD BACKREAM TO LIMIT POTENTIAL FOR SWABBING IN SHUBLIK GAS. -MONITOR WELL FOR 10 MINUTES ON BOTTOM:STATIC I-267 GPM,1590 PSI AT 13,800'MD I-115 RPM,6K TORQUE,155K ROTATING !WEIGHT 08.00 - 14:00 I 6.00 DRILL N DPRB I PROD1 POH ON ELEVATORS FROM 13390'MD TO BHA AT 266'MD MONITOR WELL FOR 10 MINUTES AT BHA: STATIC Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 64 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UW:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 14:30 0.50 DRILL P PROD1 PERFORM WEEKLY BOPE FUNCTION TEST MONITOR WELL FOR 10 MIN AT BHA:STATIC FUNCTION TEST UPPER AND LOWER BOP RAMS,HCR KILL,HCR CHOKE,AND ANNULAR PREVENTER ON LAST STAND OF 4"DRILL PIPE 14:30 - 17:00 2.50 DRILL N DPRB PROD1 LAY DOWN 6-1/8"DRILLING BHA -PJSM WITH RIG CREWAND DIRECTIONAL HANDS ON LAYING DOWN NUKES -REMOVE NUCLEAR SOURCES -STAND BACK DRILL COLLARS -DOWNLOAD MWD TOOL AND RESET FOR MOTOR ASSEMBLY -BREAK OFF BIT(GRADE 0-0-IN GAUGE),LAY 4 DOWN AUTOTRAK + 17:00 - 17:30 0.50 DRILL N DPRB PROD1 I CLEAN AND CLEAR RIG FLOOR NOTE:FUNCTION TEST BLIND RAMS 17:30 - 19:00 1.50 DRILL N DPRB PROD1 PICKUP 6-1/8"DRILLING BHA WITH MUD MOTOR -PJSM WITH RIG CREWAND DIRECTIONAL HANDS -PICK UP MOTOR,CHANGE BEND TO 1.8 DEGREES -MAKE UP BIT,SMITH XR-20 INSERT TRI-CONE -MAKE UP PONY COLLARS AND MWD -RUN IN STAND OF DRILL COLLARS AND HWDP 19:00 - 00:00 5.00 DRILL N DPRB PROW RIH WITH 6-1/8"DRILLING BHA ON ELEVATORS FROM 269'MD TO 8072'MD ON 4"DP OUT OF THE DERRICK. -FILL PIPE EVERY 2500'MD,100 GPM,345 PSI 6/23/2014 00:00 - 01:30 1.50 DRILL N DPRB PROD1 I RIH WITH 6-1/8"DRILLING BHA FROM 9072' MD TO 11,800'MD -RIH ON ELEVATORS PICKING UP 4"DP STANDS OUT OF DERRICK -BREAK CIRCULATION EVERY 2500'MD,100 _ GPM,645 PSI 01:30 - 02:00 0.50 DRILL P PROD1 CHANGE OUT TOP DRIVE WASHPIPE 02:00 - 03:00 1.00 DRILL N DPRB PROD1 RIH WITH 6-1/8"DRILLING BHA FROM 11,800' MD TO 13,510'MD -RIH ON ELEVATORS PICKING UP 4"DP STANDS OUT OF DERRICK -BREAK CIRCULATION EVERY 2500'MD,100 GPM,645 PSI 03:00 - 04:30 1.50 DRILL N DPRB PROD1 WASH ASSEMBLY TO BOTTOM FROM 13,510' MD TO 13,989'MD -ORIENT MOTOR LOWSIDE AT SIDETRACK POINT. 228 GPM @ 1450 PSI 04:30 - 12:00 7.50 DRILL N DPRB PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 13,989'MD TO 14,249'MD(8655'TVD) -272 GPM, 1790 PSI ON,1730 PSI OFF,10K TORQUE ON,9K TORQUE OFF -PU 181K,SO 125K,ROT 146K I-ECD:ACTUAL=9.6 PPG,CALC=9.6 PPG -SURVEY EVERY-30 FT&BACKREAM 30 FT 'PRIOR TO CONNECTIONS -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT Printed 7/21/2014 10:22.41AM North America-ALASKA-BP Page 65 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UW:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 20:30 8.50 DRILL N DPRB PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 14,249'MD TO 14,563'MD(8655'TVD) -300 GPM, 2100 PSI ON,2000 PSI OFF,7K TORQUE ON,7K TORQUE OFF 1-PU 181K,SO 130K,ROT 148K -ECD:ACTUAL=9.67 PPG,CALC=9.6 PPG SURVEY EVERY-30 FT&BACKREAM 90 FT PRIOR TO CONNECTIONS -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT -FLOW CHECK DRILLING BREAK AT 14,503' -SLIGHT STATIC LOSSES -DYNAMIC LOSS RATE 10 BBL/HR INCREASING TO 40 BBL/HR -START BACKGROUND LCM 20:30 - 23:00 2.50 DRILL N DPRB PROD1 CIRCULATE SURFACE TO SURFACE -295 GPM,2100 PSI -60 RPM,5-6K TORQUE RECIPROCATE PIPE AT 5 FT/MIN IN 40' STROKES -PUMPED 40 BBL HI-VIS SWEEP WITH 40 PPB LCM -FLUID LOSS RATE TEST FOR 10 MIN -LOSS RATE AT 18 BBLS/HR AFTER SWEEP REACHED SURFACE LOSS RATE BEFORE PUMPING LCM SWEEP WAS AT 40 BBL/HR 23:00 - 00:00 1.00 DRILL N DPRB PROD1 BACKREAM OUT OF THE HOLE FROM 14,563' MD TO 14,176'MD -BACKREAM TO LIMIT POTENTIAL FOR SWABBING IN SHUBLIK GAS AND TO CHECK CONDITION OF BUILD HOLE SECTION -MONITOR WELL FOR 10 MINUTES ON BOTTOM:STATIC -295 GPM,2050 PSI AT 14,400'MD -60 RPM,3-5K TORQUE,140K ROTATING WEIGHT -BACKREAMING AT 1000 FT/HR NOTE:LOSS RATE WHILE BACKREAMING 30 BBL/HR 6/24/2014 00:00 - 02:00 ' 2.00 DRILL N DPRB PROD1 BACKREAM OUT OF THE HOLE FROM 14,176' MD TO 7"LINER SHOE AT 13,446'MD -PUMP OUT OF THE HOLE TO LIMIT POTENTIAL FOR SWABBING IN SHUBLIK GAS. -BACKREAM OUT OF THE HOLE TO IMPROVE WELLBORE CONDITIONS THROUGH HI-DEGREE DOGLEGS -296 GPM,1800 PSI AT 13,800'MD -60 RPM,3-5K TORQUE,140K ROTATING WEIGHT NOTE:LOSS RATE WHILE BACKREAMING 30 BBL/HR 02:00 - 03:00 1.00 DRILL N DPRB PROD1 CIRCULATE BOTTOMS-UP 1 TIME AT SHOE -NO SIGNS OF GAS FROM SHUBLIK -300 GPM,1950 PSI -50 RPM,5K TORQUE 03:00 - 09:30 6.50 DRILL N DPRB PROD1 PON ON ELEVATORS FROM 13,446'MD TO 295'MD -PU 166K,SO 125K AT 13446'MD -MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 66 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 i End Date: X3-014GC-C:(151447.096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/me:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. I UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) i i (usft) 09:30 - 11:30 2.00 DRILL N DPRB PROD1 LAY DOWN BHA -MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA THROUGH STACK:STATIC •-PJSM WITH RIG CREW AND DIRECTIONAL HANDS ON HANDLING BHA -STAND BACK DRILL COLLARS -LAY DOWN BHA COMPONENTS -BREAK BIT,GRADE 1-1 IN GAUGE 11:30 - 12:00 0.50 WHSUR P PROD1 PULL WEAR BUSHING 12:00 - 12:30 0.50 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR 12:30 - 15:30 3.00 DRILL P PROD1 •RIG UP TO TEST BOPE -RIG UP SECONDARY KILL LINE TO IA TO FILL AND MONITOR LOSSES WHILE TESTING -MAKE 4.5"TEST JOINT AND SET TEST PLUG •-RILDS -FILL STACK AND LINES -PROVIDE TOUR FOR 25 STUDENT ULTIMATE FIELD TRIP 15:30 - 21:30 6.00 DRILL P •PROD1 TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 4.5"AND 2-7/8°TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WITNESS WAIVED BYAOGCC REP JIM REGG { ! -NO FAILURE-5 BPH STATIC LOSSES THROUGHOUT TEST AND DAY 21:30 - 22:30 1.00 DRILL P PROD1 PULL TEST PLUG -DRAIN STACK ,-BLOW DOWN ALL LINES -SET WEAR BUSHING,ID-9 1/4" 22:30 - 00:00 1.50 DRILLN DPRB PROD1 MAKE UP BHA WITH ROTARY STEERABLE -PJSM WITH RIG CREW AND DIRECTIONAL HANDS ON HANDLING NUCLEAR SOURCES • -PICK UP ROTARY STEERABLE AND MAKE UP MWD TOOLS -MAKE UP BIT,SAME SECURITY PDC AND MWD FROM PREVIOUS RSS RUN 6/25/2014 00:00 00:30 0.50 DRILL N DPRB 15,601.00 PROD1 CONTINUE TO PICK UP BHA TO 266'MD -RUN COLLARS IN THE HOLE OUT OF DERRICK 00:30 - 07:00 6.50 DRILL N DPRB 15,601.00 PROD1 RIH WITH 6-1/8"DRILLING BHA ON 4"DP FROM BHAAT 266'MD TO 7"LINER SHOE AT 13446'MD -FILL PIPE EVERY 2500'MD,100 GPM,250 PSI -5 BPH LOSSES TO WELL WHILE TRIPPING IN HOLE NOTE:SHALLOW TEST MWD TOOL AT 2665' (PASS) L-300 GPM,1040 PSI 07:00 - 08:30 1.50 DRILL P PROD1 SLIP AND CUT 102',12 WRAPS,OF 1-3/8" DRILL LINE(2241 TON-MILES ACCUMULATED). CALIBRATE TOTCO AND BAKER DEPTH TRACKERS. -STAB OPEN FOSV AND MONITOR WELL WITH CONTINUOUS CIRCULATION OVER TOP OF WELL DURING CUT(5 BPH STATIC LOSSES) Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 67 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-11 B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 10:30 2.00 DRILL N DPRB 15,601.00 PROD1 TRIP IN HOLE WITH 6-1/8"RSS DRILLING ASSEMBLY ON 4"DP FROM 7"LINER SHOE AT 13446'MD TO PREVIOUSLY DRILLED MD OF 14563'MD. LOG AND WASH FINAL STAND TO BOTTOM. -NO ISSUES PASSING BY SIDETRACK POINT OR TRIPPING THROUGH OPENHOLE 10:30 - 00:00 13.50 DRILL N DPRB 15,601.00 PROD1 DIRECTIONAL DRILL 6-1/8"HORIZONTAL ZONE 1 PRODUCTION HOLE FROM 14563'MD TO 15,539'MD(976'IN 13 HRS=75 FPH WITH CONNECTIONS) -130-150 FPH INSTANTANEOUS ROP RATES -300 GPM,2070 PSI,135 RPM,8-9 KFT-LBS TORQUE ON BOTTOM,6-7 KFT-LBS TORQUE OFF,8-10 KLBS WOB -10 BPH DYNAMIC LOSSES TO FORMATION, ADDING BACKROUND LCM -CIRCULATE 1.5 MIN AT BOTTOM OF EACH STAND PRIOR TO MAKING CONNECTION PER PROGRAM. -SURVEY EVERY 90'MD -MW IN/OUT=8.7 PPG -CALCULATED CLEANHOLE ECD=9.72 PPG, ACTUAL=9.89 PPG 6/26/2014 00:00 - 01:00 1.00 DRILL N DPRB 15,601.00 PROD1 DIRECTIONAL DRILL 6-1/8"HORIZONTAL ZONE 1 PRODUCTION HOLE FROM 15,539'MD TO 15,601'MD(62'IN 1 HRS=67 FPH WITH CONNECTIONS) -130-150 FPH INSTANTANEOUS RATES -300 GPM,2070 PSI, 135 RPM,8-9 KFT-LBS TORQUE ON BOTTOM,6-7 KFT-LBS TORQUE OFF,8-10 KLBS WOB -10 BPH DYNAMIC LOSSES TO FORMATION, ADDING BACKROUND LCM -CIRCULATE 1.5 MIN AT BOTTOM OF EACH STAND PRIOR TO MAKING CONNECTION PER PROGRAM. -SURVEY EVERY 90'MD -MW IN/OUT=8.7 PPG -CALCULATED CLEANHOLE ECD=9.72 PPG, ACTUAL=9.89 PPG -PUMP 20BBL-40LB/BBL LCM PILL,DID NOT NOTICE ANY CHANGE IN LOSSES AFTER PUMPING PILL Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 68 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-118©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 11:00 10.00 DRILL P PROD1 1 DIRECTIONAL DRILL 6-1/8"HORIZONTAL ZONE 1 PRODUCTION HOLE FROM 15,601'MD TO 16,298'MD(697 IN 10.5 HRS=66 FPH WITH CONNECTIONS) -130-150 FPH INSTANTANEOUS RATES -300 GPM,2130 PSI,135 RPM,13-14 KFT-LBS TORQUE ON BOTTOM,11-12 KFT-LBS TORQUE OFF,8-10 KLBS WOB -10 BPH DYNAMIC LOSSES TO FORMATION, ADDING BACKROUND LCM -CIRCULATE 1.5 MIN AT BOTTOM OF EACH STAND PRIOR TO MAKING CONNECTION PER PROGRAM. -SURVEY EVERY 90'MD MW IN/OUT=8.7 PPG -CALCULATED CLEANHOLE ECD=9.78 PPG, ACTUAL=10.05 PPG NOTE:STEERING HEAD FAILURE ON ONTRAK STYSTEM,NOTIFIED ODE DECISION WAS MADE TO PULL OUT OF HOLE AND CHANGE OUT 11:00 - 13:00 2.00 DRILL N DFAL i 16,298.00 PROD1 CIRCULATE BOTTOMS-UP 1 TIME -300 GPM,2130 PSI -135 RPM,5-7KTORQUE -PUMPED 40 BBL HI-VIS SWEEP, LOW-MODERATE INCREASE IN SOLIDS BACK AT SHAKERS -RACK BACK 1 STAND WHILE CIRCULATING 13:00 - 15:00 2.00 DRILL N DFAL 16,298.00 PROD1 POH ON ELEVATORS FROM 16,267'MD TO 14,656'MD -PU 200K,SO 125KAT 16,267'MD MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT 15:00 - 21:00 I 6.00 DRILL N DFAL 16,298.00 ! PROD1 PULL OUT OF THE HOLE FROM 14,600'MD TO 13,446'MD -MAD PASS FROM 14,600'MD TO 13,890'MD 300 GPM,1900 PSI -120 RPM,4-5K TORQUE -MAD PASS AT 300 FT/HR I-MUD WEIGHT 8.7 PPG IN,8.7 PPG OUT -OBSERVE GAS BREAKOUT AT SURFACE IN BELLNIPPLE ON FIRST BOTTOMS UP.WELL NOT FLOWING,FLUID LEVEL DROPPING.MAX LEL ON HANDHELD GAS METER AT BELLNIPPLE=15%LEL.GAS BUBBLES DIED OFF,CONTINUE OPERATIONS. -BACKREAM OUT OF HOLE FROM 13,980'MD TO 13,446'MD -300 GPM,1875 PSI AT 13,3890'MD . -135 RPM,5-7K TORQUE,145K ROTATING WEIGHT -BACKREAMING SPEED 1000,FT/HR NOTE:BACKREAMING WAS CONDUCTED FOR HOLE CLEANING AND ECD MANAGEMENT PURPOSES,ALSO TO PREVENT SWABBING IN GAS FROM THE 1 SHUBLIK FORMATION Printed 7/21/2014 10:22:41 AM North America-ALASKA-BP Page 69 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 1 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-118 @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 21:00 - 00:00 3.00 DRILL N DFAL 16,298.00 PROD1 lPOH ON ELEVATORS FROM 13,446'MD TO I 7,553'MD PU 138K,AT 7,553'MD -MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT 6/27/2014 00:00 - 03:30 3.50 DRILL N DFAL 16,298.00 PROD1 CONTINUE TO PULL OUT OF THE HOLE ON 1 ELEVATORS FROM 7,553'MD TO 266'MD MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT SPU 138K,SO 104K AT 7500'MD 03.30 - 06:00 2.50 DRILL N DFAL 16,298.00 PROD1 CHANGE OUT BHA COMPONENTS -MONITOR WELL FOR 10 MINUTES:STATIC i -PJSM WITH RIG CREWAND DIRECTIONAL HANDS ON HANDLING BHA AND NUCLEAR SOURCES BREAK OFF BIT AND INSPECT,GRADE 0-0, 1 DECISION MADE TO RERUN BIT -CHANGE OUT AUTOTRACK -PLUG IN AND TEST MWD TOOLS -LOAD NUCLEAR SOURCES 106:00 - 06:30 0.50 DRILL P PROD1 SERVICE TOP DRIVE -SWAP OUT PS-21 SLIPS 06:30 13:30 7.00 DRILL N ' DFAL � 16,298.00 PROD1 RIH WITH 6-1/8"DRILLING BHA FROM 454'MD •TO 13,424'MD RIH ON ELEVATORS PICKING UP 4"DP STANDS OUT OF DERRICK -FILL PIPE EVERY 2500'MD,117 GPM,655 PSI NOTE:SHALLOW TEST MWD TOOL AT 2,809' 1,— MD,300 GPM AT 1000 PSI=PASS 13.30 - 16:30 3.00 DRILL N DFAL 16,298.00 PROD1 CIRCULATE AND CONDITION MUD INSIDE 7" SHOE OBSERVED GAS BREAKING OUT OF MUD AT SURFACE FROM BOTTOMS UP,DIVERTED RETURNS THROUGH MUD GAS SEPARATOR, CIRCULATE OUT GAS,CHECK FLOW=STATIC CHECK TORQUE INSIDE 7"SHOE 1-120 RPM AT 7K TORQUE -PUMP 40 BBL EP MUD LUBE SWEEP TO ASSIST WITH TORQUE BEFORE HEADING INTO OPEN HOLE -DUMPED SWEEP AT SURFACE 16:30 - 18:30 2.00 DRILL N DFAL 16,298.00 PROD1 RIH WITH 6-1/8"DRILLING BHA ON ELEVATORS FROM 13,424'MD TO 15,025'MD I-OBSERVED TIGHT SPOT AT 15,025'MD 18:30 - 22:00 3.50 DRILL N DFAL 16,298.00 PROD1 WASH AND REAM FROM 15,025'MD TO 16,298' MD -270 GPM,1600 PSI -40 RPM,4-6 K TORQUE TIGHT HOLE WORKED THROUGH WITH PUMPS OFF,KELLY UP AND WASH DOWN WITH ROTATION Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 70 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22.00 - 00:00 2.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"HORIZONTAL ZONE 1 PRODUCTION HOLE FROM 16,298'MD TO 16,395'MD(97'IN 2 HRS=48 FPH WITH CONNECTIONS) 100 FPH INSTANTANEOUS RATES 300 GPM,1900-1920 PSI,135 RPM,7-10 KFT-LBS TORQUE ON BOTTOM,4-6 KFT-LBS •TORQUE OFF,5-10 KLBS WOB -0 BPH DYNAMIC LOSSES TO FORMATION -CIRCULATE 1.5 MIN AT BOTTOM OF EACH STAND PRIOR TO MAKING CONNECTION PER PROGRAM. -SURVEY EVERY 90'MD -MW IN/OUT=8.7 PPG -CALCULATED CLEANHOLE ECD=9.84 PPG, ACTUAL=9.88 PPG 6/28/2014 00:00 - 12:00 12.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"HORIZONTAL ZONE 1 PRODUCTION HOLE FROM 16,395'MD TO 17,375'MD(980'IN 12 HRS=82 FPH WITH CONNECTIONS) -140 FPH INSTANTANEOUS RATES -300 GPM.2190-2200 PSI,135 RPM,7-10 KFT-LBS TORQUE ON BOTTOM,4-7 KFT-LBS TORQUE OFF,5-10 KLBS WOB -14 BPH DYNAMIC LOSSES TO FORMATION -CIRCULATE 1.5 MIN AT BOTTOM OF EACH STAND PRIOR TO MAKING CONNECTION PER PROGRAM. -SURVEY EVERY 90'MD -MW IN/OUT=8.7 PPG -CALCULATED CLEANHOLE ECD=9.84 PPG, ACTUAL=9.88 PPG -PUMP HI-VIS SWEEP EVERY 3 STANDS WITH HIGH INCREASE INCREASE IN CUTTINGS UPON RETURN TO SURFACE 12:00 - 00:00 12.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"HORIZONTAL ZONE 1 PRODUCTION HOLE FROM 17,375'MD TO 18,514'MD(1139'IN 12 HRS=95 FPH WITH CONNECTIONS) -140 FPH INSTANTANEOUS RATES -300 GPM,2300-2400 PSI,135 RPM,10-12 KFT-LBS TORQUE ON BOTTOM,10 KFT-LBS TORQUE OFF,5-10 KLBS WOB -14 BPH DYNAMIC LOSSES TO FORMATION -CIRCULATE 1.5 MIN AT BOTTOM OF EACH STAND PRIOR TO MAKING CONNECTION PER PROGRAM. -SURVEY EVERY 90'MD -MW IN/OUT=8.7 PPG -CALCULATED CLEANHOLE ECD=9.99 PPG, ACTUAL=10.32 PPG -PUMP HI-VIS SWEEP EVERY 3 STANDS WITH HIGH INCREASE INCREASE IN CUTTINGS UPON RETURN TO SURFACE -PUMPING 40 LB/BBL LCM PILLS AS NEEDED TO ATTEMPT TO HEAL LOSSES Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 71 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-118 @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/29/2014 00:00 - 13:00 13.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"HORIZONTAL ZONE 1 PRODUCTION HOLE FROM 18,514'MD TO 19,493'MD(886'IN 13 HRS=75 FPH WITH CONNECTIONS) -60-130 FPH INSTANTANEOUS RATES -300 GPM,240-2450 PSI,135 RPM,14 KFT-LBS TORQUE ON BOTTOM,10 KFT-LBS TORQUE OFF,5-10 KLBS WOB -PU 185K,SO 80K,ROT 138K 12 BPH DYNAMIC LOSSES TO FORMATION -CIRCULATE 1.5 MIN AT BOTTOM OF EACH STAND PRIOR TO MAKING CONNECTION PER PROGRAM. -SURVEY EVERY 90'MD -MW IN/OUT=8.7 PPG -CALCULATED CLEANHOLE ECD=10.24 PPG, ACTUAL=10.5 PPG -PUMP HI-VIS SWEEP EVERY 3 STANDS WITH HIGH INCREASE INCREASE IN CUTTINGS UPON RETURN TO SURFACE -PUMPING 40 LB/BBL LCM PILLS AS NEEDED TO ATTEMPT TO HEAL LOSSES 13:00 - 22:00 9.00 DRILL P PROD1 CIRCULATE BOTTOMS-UP 6.5 TIMES 300 GPM,2350 PSI 180 RPM,11K TORQUE - RECIPROCATED FULL STAND WHILE CIRCULATING -PUMPED HI-VIS SWEEP,5%INCREASE IN CUTTINGS UPON RETURN TO SURFACE -PUMPED ANOTHER HI-VIS SWEEP,50% INCREASE IN CUTTINGS UPON RETURN TO SURFACE -PUMPED WEIGHTED HI-VIS SWEEP,15% INCREASE IN CUTTTINGS UPON RETURN TO SURFACE -10-12 BPH DYNAMIC LOSSES TO FORMATION 22:00 - 00:00 2.00 DRILL P PROD1 POH ON ELEVATORS FROM 19,493'MD TO 17,311'MD -PU 193K,SO 125KAT 19,493'MD MONITOR HOLE FOR 10 MINUTES:STATIC -MUD WEIGHT:8.75 PPG IN,8.75 PPG OUT -TIGHT HOLE AT 18,657'MD WITH 25K OVERPULL -RUN BACK IN HOLE 1 JOINT AND PULL THROUGH ON ELEVATORS WITH NO OVERPULL PULLED PIPE AT 50 FT/MIN Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 72 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time,9/10/1984 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/30/2014 00:00 - 03:00 3.00 DRILL P PROD1 POH ON ELEVATORS FROM 17,311'MD TO •INSIDE T'LINER SHOE @ 13,423'MD -PU 190K,SO 124KAT 17,300'MD MONITOR HOLE FOR 10 MINUTES:STATIC -MUD WEIGHT:8.75 PPG IN,8.75 PPG OUT -PULLED PIPE AT 50-100 FT/MIN -TIGHT HOLE AT 17,290'MD WITH 25K OVERPULL i -RUN BACK IN HOLE 1 JOINT AND PULL THROUGH ON ELEVATORS WITH NO OVERPULL I PUMPED OUT OF THE HOLE FROM 13,895'MD TO 13,446'MD -300 GPM,1800 PSI -PUMP OUT OF HOLE THROUGH SHUBLIK FORMATION TO REDUCE CHANCE OF SWABBING IN GAS 03:00 - 05:00 2.00 DRILL P PROD1 CIRCULATE BOTTOMS-UP 2 TIMES -300 GPM,1920 PSI -120 RPM,3-5K TORQUE -RECIPROCATE FULL STAND -PUMPED 2OBBL WEIGHTED HI-VIS SWEEP AT SHOE,MINIMAL CUTTTING INCREASE UPON ARRIVAL AT SURFACE -5-8 BPH DYNAMIC LOSSES TO FORMATION NOTE:WHILE CBU REINSERTED IRON DERRICKMAN IN PLACE.FUNCTION TEST FAILED,WOULD NOT PICK UP STAND OF PIPE OUT OF DERRICK. 05:00 - 05:30 0.50 DRILL P I PROD1 SERVICE RIG I -- 06:00 - 09:30 3.50 DRILL P PROD1 RIH WITH 6-1/8"DRILLING BHA FROM 13,400' MD TO 18,685'MD -200K UP,120K DOWN -RIH ON ELEVATORS PICKING UP 4"DP 1 STANDS OUT OF DERRICK -BREAK CIRCULATION EVERY 2000'MD,117 GPM,751 PSI MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT -TIGHT HOLE ENCOUNTERED 18,685'MD, ATTEMPTED TO WIPE HOLE WITH PUMPS OFF NO SUCCESS 09:30 - 11:30 2.00 DRILL P PROD1 RUN IN HOLE WASH AND REAM DOWN FROM 18,685'MD TO 19,493'MD -300 GPM,2400PSI -150 RPM,5-7K TORQUE -200K UP,120K DOWN,ROT 140K -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT 11:30 - 13:00 1.50 DRILL P PROD1 CIRCULATE AND CONDITION MUD 1 -300 GPM,2450 PSI -150 RPM,9K TORQUE -DYNAMIC LOSS RATE 10-12 BBLS/HR -RECIPROCATE FULL STAND AT 550 FT/HR -DUMP AND DILUTED 290 BBLS OF NEW 8.6 PPG QUIKDRIL MUD -PUMPED WEIGHTED HIGH VIS SWEEP, MINIMAL INCREASE IN SOLIDS BACKAT SHAKERS Printed 7/21/2014 10 22:41AM North America-ALASKA-BP Page 73 of 74 Operation Summary Report Common Well Name:18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447.096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release Rig Contractor.PARKER DRILLING CO. UVN:500292118100 Active datum:18-118 @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 20:00 7.00 DRILL P PROD1 BACKREAM OUT OF HOLE FROM 19,493'MD I TO 18,546'MD -300 GPM,2350 PSI AT 19,493'MD -150 RPM,9K TORQUE,140K ROTATING WEIGHT i MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT 8.7 PPG IN,8.7 PPG OUT -BACKREAMING SPEED 180 FT/HR -PUMPED HIGH VIS SWEEP,MINIMAL INCREASE IN SOLIDS BACK AT SHAKERS NOTE:BACKREAMING TO REMOVE OBSTRUCTIONS ENCOUNTERED ON THE TRIP IN THE HOLE 20:00 - 21:30 1.50 DRILL P PROD1 IRIH WITH 6-1/8"DRILLING BHA FROM 18,546' MD TO 19,493'MD -RIH ON ELEVATORS PICKING UP 4°DP STANDS OUT OF DERRICK -TIGHT HOLE HOLE ENCOUNTERED AT 18,830'MD TO 18,842'MD -ATTEMPTED TO WASH THROUGH TIGHT SPOT WITH NO SUCCESS -WASHED AND REAM THROUGH TIGHT SPOT -300GPM,2450 PSI -60 RPM,7-9K TORQUE -PICKED UP AND TRIPPED THROUGH TIGHT SPOT WITHOUT ROTAING OR PUMPING WITH NO ISSUES 21:30 - 00:00 2.50 DRILL P I PROD1 !CIRCULATE AND CONDITION MUD -300 GPM,2350 PSI 150 RPM,9K TORQUE -DYNAMIC LOSS RATE 10-12 BBLS/HR -RECIPROCATE FULL STAND AT 550 FT/HR -PUMPED HI-VIS WEIGHTED SWEEP, MINIMAL INCREASE IN SOLIDS UPON ARRIVAL TO SURFACE 7/1/2014 00:00 - 00:30 0.50 DRILL P PROD1 CONTINUE CIRCULATE AND CONDITION MUD -300 GPM,2400 PSI -150 RPM,9K TORQUE -RECIPROCATE FULL STAND -DYNAMIC LOSS RATE 10-12 BBLS/HR 00:30 - 03:30 3.00 DRILL P PROD1 I POH ON ELEVATORS FROM 19,493'MD TO r LINER SHOE AT 13,446'MD -PU 200K,SO 115KAT 17,500'MD MONITOR WELL FOR 10 MINUTES:STATIC MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -STATIC LOSS RATE 3-5 BBLS/HR PUMPED OUT OF THE HOLE FROM 13,895'MD TO 13,446'MD -300 GPM,1800 PSI -PUMP OUT OF HOLE THROUGH SHUBLIK FORMATION TO REDUCE CHANCE OF SWABBING IN GAS NOTE:NO TIGHT HOLE ENCOUNTERED ON FINAL TRIP OUT OF THE HOLE Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 74 of 74 Operation Summary Report Common Well Name.18-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/1/2014 End Date: X3-014GC-C:(15,447,096.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 06:00 2.50 DRILL P PROD1 CIRCULATE BOTTOMS-UP 2 TIMES -300 GPM,1920 PSI -120 RPM,3-5K TORQUE -PUMPED 2OBBL WEIGHTED HI-VIS SWEEP AT SHOE,MINIMAL SOLIDS INCREASE UPON ARRIVAL AT SURFACE 06:00 - 11:30 5.50 DRILL P PROD1 POH ON ELEVATORS FROM 7"LINER SHOE AT 13,446'MD TO 456'MD -PU 150K,SO 130KAT 13,446'MD MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -STATIC LOSS RATE 3-5 BBLS/HR NOTE:FUNCTION TEST TOP RAMS,BOTTOM RAMS,ANNULAR,CHOKE VLAVE,KILL LINE VALVE ON LAST STAND OF 4"DRILL PIPE 11:30 - 14:30 3.00 DRILL P PROD1 LAY DOWN 6-1/8"DRILLING BHA -PJSM WITH RIG CREWAND DIRECTIONAL HANDS ON HANDLING BHA AND NUCLEAR SOURCES -MONITOR WELL FOR 10 MINUTES BEFORE PULLING BHA THROUGH BOPE STACK: STATIC -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -LAY DOWN HEAVY WEIGHT DRILL PIPE -LAY DOWN DRILL COLLARS -REMOVE NUCLEAR SOURCES AND DOWNLINK MWD TOOL -BREAK BIT LAY DOWN ROTARY STEERABLE NOTE:FUNCTION TEST BLIND RAMS AFTER ALL TOOLS WERE OUT OF THE HOLE END RON REPORT SEE CON REPORT 7/1/2014 Printed 7/21/2014 10:22:41AM North America-ALASKA-BP Page 1 of 8 Operation Summary Report Common Well Name: 18-11 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/1/2014 End Date:7/8/2014 X3-014GC-C:(5,107,908.27) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM l Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-118(864.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) I 7/1/2014 14:30 - 15:00 0.50 CASING i P 1 RUNPRD I CLEAN AND CLEAR RIG FLOOR 15:00 - 17:00 2.00 CASING P RUNPRD 1 RIG UP TO RUN 4.5"LINER CHANGE OUT ELEVATORS -CHANGE OUT SLIPS -BRING CASING TOOLS TO RIG FLOOR -PERFORM WEEKLY BOPE FUNCTION TEST 17:00 - 00:00 7.00 CASING P RUNPRD RUN 4.5",12.6#,L-80,VAM TOP LINER TO 4.400'MD -CHECK FLOATS -USE JET LUBE SEAL GAURD PIPE DOPE -TORQUE CONNECTIONS TO 4,440 FT-LBS -RUN 2 FLOATING CENTRALIZERS ON JOINTS 1-150 -FILL CASING EVERY 10 JOINTS -PU 72K,S0 72K _ 7/2/2014 00:00 - 04:00 4.00 CASING P RUNPRD RUN 4.5",12.6#,L-80,VAM TOP LINER FROM 41400'MD TO 6,483'MD -CHECK FLOATS,FLOATS HOLDING -USE JET LUBE SEAL GAURD PIPE DOPE -TORQUE CONNECTIONS TO 4,400 FT-LBS -RUN 2 FLOATING CENTRALIZERS ON 1 I JOINTS 1-140 AND 142-151 -FILL CASING EVERY 10 JOINTS -PU 72K,SO 72K MAKE UP LINER HANGER/PACKER ASSEMBLY -ADD PAL MIX -CIRCULATE 1 LINER VOLUME AT 3 BPM,450 PSI 04:00 - 06:00 2.00 CASING P RUNPRD CHANGE OUT SAVER SUB ON TOPDRIVE -MONITOR WELL ON TRIP TANKS 06:00 - 10:30 4.50 CASING P RUNPRD RUN 4.5"VAM TOP LINER IN HOLE ON 4"DP . FROM 6,483'MD TO 13,446'MD 1-RIH ON ELEVATORS PICKING UP 4"DP STANDS OUT OF DERRICK -FILL PIPE AND BREAK CIRCULATION EVERY I i 11000'MD,131 GPM,695 PSI I -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT 10:30 - 13:00 2.50 CASING P RUNPRD CIRCULATE AND CONDITION MUD AT 7" SHOE,13,446'MD,1X BOTTOMS UP -150 GPM,960 PSI PIPE WAS NOT RECIPROCATED 13:00 - 19:30 6.50 CASING P RUNPRD RUN INTO OPEN HOLE WITH 4.5",12.6#,L-80, 1 i VAM TOP LINER FROM 13,446'MD TO 19,493' MD -FILL PIPE AND BREAK CIRCULATION EVERY • 1000 FT AT 86 GPM FOR-5 MINUTES -OBTAIN PU/SO WEIGHTS EVERY-1000 FT -PU 185K,SO 169K -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT -LOSS RATE:7 BBLS/HR -TOP OF LINER AT 13,014'MD NOTE:NO TIGHT SPOTS OBSERVED ON TRIP T IN OPEN HOLE WITH LINER Printed 7/21/2014 10:23:30AM North America-ALASKA-BP Page 2 of 8 Operation Summary Report Common Well Name:18-11 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/1/2014 End Date:7/8/2014 X3-014GC-C:(5,107,908.27) Project Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 22:00 2.50 CASING P RUNPRD STAGE UP TO CEMENTING RATE IN.5 BPM INCREMENTS TO FINAL CIRCULATING RATE OF 4 BPM. -@ 2 BPM,980 PSI -@ 3 BPM,1190 PSI -@ 4 BPM,1440 PSI -CONDITION MUD TO 8.7 PPG,3 PV,16 YP -CIRCULATE 1 BOTTOMS-UP -RECIPROCATED PIPE 12 FT AT SURFACE AT 40 FT/MIN PJSM WITH CEMENTERS AND RIG CREW WHILE CIRCULATING, SHUT DOWN PUMPS TO MU CEMENT HEAD 22:00 - 00:00 2.00 CASING P RUNPRD CEMENT4.5"PRODUCTION LINER AS FOLLOWS: -FILL LINES WITH WATER AND PRESSURE TEST TO 250/4500 PSI FOR 5 MINUTES EACH -PUMP 30 BBLS OF 10 PPG MUDPUSH II SPACER @ 5 BPM,1400 PSI -PUMP 146 BBLS OF 15.8 PPG CLASS G TAIL @ 5 BPM,EXCESS VOLUME 30% (YIELD 1.17 CU.FT/SK)FIRST 3OBBL NEAT CEMENT,106 BBL WITH 1 PPB CEMNET,1088E NEAT CEMENT DROP DRILL PIPE WIPER DART,WIPER DART RELEASED 10.8 BBL LATE,CONSULT WITH ODE AND DRILLING SUPERINTENDENT FOR PLAN FORWARD,DECISION MADE TO PUMP CALCULATED DISPLACEMENT+10.8 BBL TO BUMP THE PLUG. Printed 7/21/2014 10:23:30AM North America-ALASKA-BP Page 3 of 8 Operation Summary Report Common Well Name:18-11 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/1/2014 End Date:7/8/2014 X3-014GC-C:(5,107,908.27) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/3/2014 00:00 - 03:00 3.00 CASING P RUNPRD 4.5"LINER CEMENT DISPLACEMENT -SCHLUMBERGER CEMENTERS PERFORM DISPLACEMENT -90 BBLS OF 8.5 PPG PERF PILL DISPLACED AT 5 BPM:ICP 94 PSI,FCP 281 PSI -39 BBLS OF MUD AT 5 BPM:ICP 2378 PSI, FCP 2927 PSI -10 BBLS OF MUD AT 3 BPM ICP 2104 PSI, FCP 2694 PSI -91 BBLS OF MUD AT 3 BPM ICP 2850 PSI, FCP 2942 PSI -18 BBLS OF MUD AT 2 BPM ICP 2060 PSI, FCP 2900 PSI -DISPLACEMENT FLUID:90 BBLS OF 8.5 PPG PERF PILL FOLLOWED BY 158 BBL OF 8.6 PPG,QUIKDRILL -LATCH UP CONFIRMED AT 150 BBLS DISPLACED -REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 2900 PSI CIP @ 01:00 7/3/2014 -TOTAL DISPLACEMENT VOLUME 248 BBLS -TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE:10 BBLS INCREASE PRESSURE TO 3500 PSI TO SET HANGER AFTER PLUG BUMP -SET DOWN 50K TO CONFIRM HANGER SET -CHECK FLOATS-GOOD -PU TO EXPOSE DOG SUB AND SET DOWN ON LINER TOP 50K,40 RPM -PRESSURE UP TO 500 PSI AND PU TO REMOVE RS PACK-OFF AND CIRCULATE EXCESS CEMENT OFF LINER TOP -PU RUNNING TOOL ABOVE LINER TOP AND MARK NO-GO.CIRCULATE 1.5 BU AT 10 BPM --30 BBLS OF CONTAMINATED CEMENT TO SURFACE ON BOTTOMS UP -TOTAL LOSSES DURING CMT JOB=12 BBL 03:00 - 04:30 1.50 CASING P RUNPRD DISPLACE WELL TO CLEAN SEAWATER -14BPM,3500 PSI -RECIPROCATE 40' 04:30 - 14:30 10.00 CASING P RUNPRD TRIP OUT OF THE HOLE FROM THE TOP OF THE LINER AT 13,014'MD TO SURFACE -MONITOR WELL ON TRIP TANKS -LAY DOWN 60 STANDS OF DRILL PIPE -LAY DOWN RUNNING TOOL AS PER BAKER REP. -DOGS ON LINER RUNNING TOOL WERE INSPECTED AND EXPOSED 14:30 - 15:00 0.50 CASING P RUNPRD SERVICE TOP DRIVE 15:00 - 17:00 2.00 CASING P RUNPRD RIG UP TO RUN GUNS -LOAD GUNS INTO PIPE SHED -PJSM WITH RIG CREWAND SLB GUN HANDS ON HANDLING -INSPECT ALL LIFTING DEVICES 17:00 - 18:00 1.00 CASING P RUNPRD PRESSURE TEST 4.5"LINER -250 PSI LOW FOR 5 MIN/3500 PSI HIGH FOR 30 MIN EACH -PUMPED 8.9 BBL,BLED BACK 8.9 BBL -TEST APPROVED BY BP WTL JIM WILLINGHAM Printed 7/21/2014 10:23:30AM North America-ALASKA-BP Page 4 of 8 Operation Summary Report Common Well Name:18-11 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/1/2014 End Date:7/8/2014 X3-014GC-C:(5,107,908.27) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) -- Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 PERF P RUNPRD RIH WITH 2-7/8"GUNS FROM SURFACE MD TO 2,315'MD RIH ON ELEVATORS PICKING UP GUNS AND I PAC PIPE FROM SHED -PU WT 59K,SO WT 59K AT 2,315'MD -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT 7/4/2014 00:00 - 06:30 6.50 PERF P RUNPRD RIH WITH 2-7/8"GUNS FROM 2,315'MD TO 6,553'MD -RIH ON ELEVATORS PICKING UP GUNS AND PAC PIPE FROM SHED PU WT 59K,SO WT 59KAT 2,315'MD -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT 06:30 - 07:00 0.50 PERF P RUNPRD I RIG DOWN DOYON CASING AND INSTALL PS-21 SLIPS 07:00 - 14:00 7.00 PERF P RUNPRD RIH WITH 4"DRILL PIPE FROM 6,553'MD TO 19,377'MD -PU WT 188K,SO WT 125KAT 19,377'MD 14:00 - 16:00 2.00 PERF P RUNPRD RACK BACK 5 STANDS AND PICK UP SINGLE. -RUN THROUGH GUN FIRING SEQUENCE AND FIRE GUN 4.5 BBLS LOSS AFTER GUNS FIRED I-PERF INTERVALS AS FOLLOWS: 17,280'MD-17,630'MD(350') 17,850'MD-18,180'MD(330') -18,230'MD-18,550'MD(320') -18,850'MD-19,000'MD(150') 18:00 - 17:00 1.00 PERF P RUNPRD I POOH ON ELEVATORS FROM 19,000'MD TO 16,524'MD -PU WT 185K,SO WT 125K AT 19.000'MD PULLED ABOVE TOP PERFS _ 17:00 - 18:30 1.50 PERF P I RUNPRD I CIRCULATE BOTTOMS UP -250 GPM,2850 PSI -4 BBUHR DYNAMIC LOSSES 18:30 - 22:00 3.50 PERF P RUNPRD POOH ON ELEVATORS FROM 16,524'MD TO 14,060'MD -PU WT 175K,SO WT 120K AT 14,060'MD -LAY DOWN SINGLES TO PIPESHED -MONITOR WELL ON TRIP TANKS ,-1 BBUHR LOSSES WHILE PULLING OUT OF •THE HOLE 22:00 - 23:30 1.50 PERF • P RUNPRD SLIP AND CUT LINE -CUT 33 WRAPS/264'OF DRILLING LINE -CUT ADDITIONAL LINE DUE TO BAD LINE 23:30 - 00:00 0.50 PERF P RUNPRD SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT _ 7/5/2014 00:00 - 08:00 8.00 PERF P RUNPRD POOH ON ELEVATORS FROM 14,060'MD TO 6,578'MD -PU W-1-140K,SO WT 123K -LAY DOWN SINGLES TO PIPESHED -MONITOR WELL ON TRIP TANKS 1 BBL/HR LOSSES WHILE PULLING OUT OF THE HOLE ,-MUD WEIGHT IN=8.5 PPG,MUD WEIGHT OUT=8.5 PPG 08:00 - 09:00 1.00 PERF P RUNPRD I RIH WITH REMAINING 4"DRILL PIPE STANDS OUT OF THE DERRICK FROM 6,578'MD TO 10,000'MD -RIH ON ELEVATORS -MUD WEIGHT IN=8.5 PPG,MUD WEIGHT OUT=8.5PPG Printed 7/21/2014 10:23:30AM North America-ALASKA-BP Page 5 of 8 Operation Summary Report Common Well Name:18-11 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/1/2014 End Date:7/8/2014 X3-014GC-C:(5,107,908.27) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 12:00 3.00 PERF P RUNPRD POOH ON ELEVATORS FROM 10,000'MD TO 6,578'MD -PU WT 80K,SO WT 82K -LAY DOWN SINGLES TO PIPESHED -MONITOR WELL ON TRIP TANKS -1 BBL/HR LOSSES WHILE PULLING OUT OF THE HOLE -MUD WEIGHT IN=8.5 PPG,MUD WEIGHT OUT=8.5 PPG 12:00 - 00:00 12.00 PERF P RUNPRD POOH ON ELEVATORS FROM 6,578'MD TO 500'MD -LAY DOWN SINGLES TO PIPESHED -LAY DOWN 2-7/8"PAC PIPE AND PERF GUNS -MONITOR WELL ON TRIP TANKS -1 BBL/HR LOSSES WHILE PULLING OUT OF THE HOLE -MUD WEIGHT IN=8.5 PPG,MUD WEIGHT OUT=8.5 PPG 7/6/2014 00:00 - 00:30 0.50 PERF P RUNPRD POOH FROM 500'MD TO SURFACE -LAY DOWN AND INSPECT GUNS -ALL GUNS FIRED -MUD WEIGHT IN=8.5 PPG,MUD WEIGHT OUT=8.5 PPG 00:30 - 01:00 0.50 PERF P RUNPRD CLEAN AND CLEAR RIG FLOOR 01:00 - 01:30 0.50 WHSUR P RUNCMP PULL WEAR BUSHING 01:30 - 02:30 1.00 RUNCOM P RUNCMP MOBILIZE CASING TOOLS TO THE RIG FLOOR AND RIG UP TO RUN COMPLETION -PJSM ON RUNNING COMPLETION 02:30 - 12:00 9.50 RUNCOM P RUNCMP RUN 4-1/2",12.6#,13CR-85 VAMTOP COMPLETION TUBING FROM SURFACE TO 7535'MD -TORQUE CONNECTIONS TO 4440 FT-LBS -APPLY JET LUBE SEAL GUARD PIPE DOPE ON EACH CONNECTION -PU WT 100K,SO WT 90K -MUD WEIGHT IN=8.5 PPG,MUD WEIGHT OUT=8.5 PPG 12:00 - 18:00 6.00 RUNCOM P RUNCMP RUN 4-1/2",12.6#,13CR-85 VAMTOP COMPLETION TUBING FROM 7535'TO 12924' -TORQUE CONNECTIONS TO 4440 FT-LBS -APPLY JET LUBE SEAL GUARD PIPE DOPE ON EACH CONNECTION -PU WT 133K,SO WT 104K -MUD WEIGHT IN=8.5 PPG,MUD WEIGHT OUT=8.5 PPG Printed 7/21/2014 10:23:30AM North America-ALASKA-BP Page 6 of 8 Operation Summary Report Common Well Name:18-11 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/1/2014 End Date:7/8/2014 X3-014GC-C:(5,107,908.27) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B©64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 23:30 5.50 RUNCOM P RUNCMP TAG NO-GO AT 13021'MD AND SET DOWN 5K TO VERIFY -PICK UP 2 EXTRA JOINTS OF TUBING TO TAG UP PICK UP AND ROTATE 1/2 TURN TO RIGHT AND TAG WITH 5K DOWN -PICK UP AND ROTATE ANOTHER 1/2 TURN TO RIGHT AND SET DOWN 5K TO VERIFY -LAY DOWN 2 JOINTS -MAKE UP 5.81'PUP JOINT -MAKE UP LANDING JOINT -MAKE UP TUBING HANGER TO LANDING JOINT -DRAIN STACK -LAND TUBING AND RUN IN LOCK DOWN SCREWS -BACK OUT LANDING JOINT AND LAY DOWN -RE TAP LOCK DOWN SCREWS 23:30 - 00:00 0.50 RUNCOM P RUNCMP RIG UP TO PUMP CORROSION INHIBITED BRINE 7/7/2014 00:00 - 03:00 3.00 RUNCOM P RUNCMP SPOT CORROSION INHIBITIVE BRINE BETWEEN PRODUCTION PACKER AND SHEAR VALVE -PUMP 201 BBLS OF 8.5 PPG SEAWATER AT 4 BPM,411 PSI -PUMP 185 BBLS OF CORROSION INHIBITED BRINE AT 4 BPM,440 PSI -CHASE WITH 149 BBLS OUT OF PITS AT 440 PSI -LINE UP AND PUMP 5 BBLS DOWN TUBING TO WASH RHC PLUG 03:00 - 03:30 0.50 RUNCOM P RUNCMP RIG UP LANDING JOINT AND DROP BALL AND ROD TO RHC PLUG -RIG DOWN LANDING JOINT 03:30 - 05:30 2.00 RUNCOM P RUNCMP SET PACKER -PRESSURE UP ON TUBING TO 250 PSI LOW FOR 5 MINUTES;PASS -PRESSURE UP TO 3500 PSI ON TUBING; PACKER SET AT 1890 PSI. HOLD FOR 30 MINUTES;PASS -BLEED TUBING DOWN TO 1500 PSI,LINE UP TO PUMP DOWN ANNULUS;250 PSI LOW FOR 5 MINUTES;PASS -PRESSURE UP TO 3500 PSI ON ANNULUS AND HOLD FOR 30 MINUTES;PASS -RECEIVE APPROVAL TO PROCEED FROM WTL JIM WILLINGHAM -SHEAR DCK,PUMP 9 BBLS AND BLEED BACK 9 BBLS -LINE UP AND PUMP DOWN TUBING TAKE RETURNS OUT OF ANNULUS AT 2.5 BPM AT 780 PSI -LINE UP AND PUMP DOWN ANNULUS TAKE RETURNS UP TUBING AT 2.5 BPM AT 710 PSI 05.30 - 07:00 1.50 RUNCOM P RUNCMP RIG UP TO FREEZE PROTECT IA -BLOW DOWN CHOKE AND KILL LINES -SUCK OUT STACK AND RIG UP LANDING JOINT AND LINES TO PUMP DIESEL 07:00 - 08:30 1.50 RUNCOM P RUNCMP LINE UP AND PRESSURE TEST SURFACE LINES -REVERSE IN 138 BBLS OF DIESEL AT 2 BPM, 900 PSI Printed 7/21/2014 10:23:30AM North America-ALASKA-BP Page 7 of 8 Operation Summary Report Common Well Name:18-11 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/1/2014 End Date:7/8/2014 X3-014GC-C:(5,107,908.27) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-11B @64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 11:00 2.50 RUNCOM P RUNCMP U TUBE FREEZE PROTECT -SHUT IN IAAND BLEED OFF LINES;VERIFY NO PRESSURE BY SHUTTING IN IA -BLEED LINES TO ZERO AND REOPEN ANNULUS -PULL DOWN POWER SHOE 11:00 - 14:00 3.00 WHSUR P RUNCMP RIG DOWN FREEZE PROTECT AND INSTALL TWC -PULL LANDING JOINT -BUILD T BAR -INSTALL TWC FILL STACK AND TEST TWC FROM ABOVE AND BELOW 250 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES EACH 14:00 - 15:30 1.50 WHSUR P RUNCMP RIG DOWN TWC EQUIPMENT BLOW DOWN AND STORE LINES -BREAK AND LAY DOWN LANDING/SHEAR JOINT -CLEAN AND CLEAR RIG FLOOR 15:30 - 19:00 3.50 WHSUR P RUNCMP NIPPLE DOWN BOPE -CLEAN OUT FLOW BOX AND SUCK OUT STACK -DISCONNECT DRAINS AND FLOWLINE -BLOW DOWN SURFACE LINES AND EQUIPMENT -PULL PINCHER NIPPLE AND NIPPLE DOWN BOPE AND RISERS SIMOPS:WORK ON IRON DERRICK MAN, CLEAN PITS 19:00 - 21:00 2.00 WHSUR P RUNCMP CLEAN AND INSPECT WELL HEAD -NIPPLE UP TREE AND ADAPTER SIMOPS:WORK ON IRON DERRICK MAN, CLEAN PITS 21:00 - 23:00 2.00 WHSUR P RUNCMP TEST VOID ON TREE 250 PSI LOW FOR 5 MINUTES AND 5000 PSI HIGH FOR 30 MINUTES;PASSED SIMOPS:WORK ON IRON DERRICK MAN, CLEAN PITS 23:00 - 00:00 1.00 RIGD P RUNCMP BREAK APART SURFACE LINES ON RIG FLOOR -FLUSH AND REMOVE REMAINING FLUID IN PITS -REMOVE WINGS FROM IDL PIN POCKETS AND REPIN IDL SIMOPS:WORK ON IRON DERRICK MAN, CLEAN PITS 7/8/2014 00:00 - 01:30 1.50 WHSUB P RUNCMP PRESSURE TEST TREE -250 PSI LOW FOR 5 MIN AND 5000 PSI HIGH FOR 10 MIN SIMOPS:WORK ON IRON DERRICK MAN, CLEAN PITS Printed 7/21/2014 10:23:30AM North America-ALASKA-BP Page 8 of 8 Operation Summary Report Common Well Name:18-11 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/1/2014 End Date:7/8/2014 X3-014GC-C:(5,107,908.27) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:PARKER 272 Spud Date/Time:9/10/1984 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292118100 Active datum:18-116 l 64.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations • (hr) I (usft) 01:30 - 03:00 1.50 RIGD P RUNCMP RIG DOWN SIMOPS: -DRAIN TREE AND POUR 2 BOTTLES OF HEET ON TOP OF TWO WAY CHECK -RIG DOWN PRESSURE TESTING EQUIPMENT -CLEAN AND SECURE WELLHOUSE SIMOPS:WORK ON IRON DERRICK MAN, FINISH CLEANING PITS RIG RELEASED AT 03:00 -RIG DOWN AND PREPARE TO MOVE TO J-30 II' Printed 7/21/2014 10:23:30AM Qbp North America - ALASKA - BP Prudhoe Bay PB DS 18 18-11 500292118100 18-11B Design: 18-11B Survey Report - Geographic 24 July, 2014 r1 BAKER HUGHES Fr- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) , Site: PB DS 18 MD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True • Wellbore: 18-11B Survey Calculation Method: Minimum Curvature ' Design: 18-11B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) / System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15 usft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44 usft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.46 ° Well 18-11 API No. 500292118100 Well Position +N/-S 0.00 usft Northing: 5,960,601.69 usft • Latitude: 70°17'48.750 N +E/-W 0.00 usft Easting: 692,199.37 usft • Longitude: 148°26'36.57 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: , 17.40 usft Wellbore 18-11B API no. 500292118102 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (0) (nT) BGGM2013 6/18/2014 19.85 81.02 57,633 Design 18-11B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 2,654.05 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 48.50 0.00 0.00 314.03 Survey Program Date: 7/24/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 57.50 2,654.05 Survey#1 GCT Gyro MS(18-11 DPN) GCT-MS Schlumberger GCT multishot 2,666.00 3,107.00 Gyro MS(18-11 BPB1) GYD-CT-CMS Gyrodata cont.casing m/s 3,143.86 6,004.76 MWD(18-11BPB1) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 6,036.00 13,574.76 OnTrak MWD(18-11BPB2) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 13,640.21 19,459.78 OnTrak MWD(18-11B) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 7/24/2014 1:53:48PM Page 2 COMPASS 5000.1 Build 61 imma�°by Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-118 @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-118 @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11B Survey Calculation Method: Minimum Curvature Design: 18-11 B Database: EDM R5K-Alaska PROD-ANCP1 j Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 2,654.05 2.10 234.30 2,653.97 -2.09 -6.69 5,960,599.43 692,192.73 70'17'48.730 N 148°26'36.77 W 18-11B PB1 TIP 2,666.00 2.14 202.62 2,665.92 -2.42 -6.96 5,960,599.09 692,192.48 70°17 48.726 N 148°26'36.78 W 2,696.00 2.47 189.25 2,695.89 -3.58 -7.28 5,960,597.93 692,192.19 70°17'48.715 N 148°26'36.79 W 2,726.00 2.01 223.00 2,725.87 -4.60 -7.74 5,960,596.89 692,191.75 70°17'48.705 N 148°26'36.80 W 2,761.00 3.40 263.77 2,760.83 -5.16 -9.19 5,960,596.30 692,190.31 70°17'48.700 N 148°26'36.84 W 2,791.00 4.54 281.32 2,790.76 -5.02 -11.24 5,960,596.38 692,188.26 70°17'48.701 N 148°26'36.90 W 2,821.00 5.44 290.61 2,820.65 -4.29 -13.74 5,960,597.05 692,185.75 70°17'48.708 N 148°26'36.97 W 2,857.00 6.31 300.16 2,856.46 -2.70 -17.04 5,960,598.56 692,182.40 70°17'48.724 N 148°26'37.07 W 2,887.00 7.29 309.76 2,886.25 -0.65 -19.93 5,960,600.53 692,179.46 70°17'48.744 N 148°26'37.16 W 2,917.00 8.87 316.53 2,915.95 2.25 -22.99 5,960,603.35 692,176.33 70°17'48.772 N 148°26'37.24 W 2,951.00 10.52 319.93 2,949.46 6.52 -26.79 5,960,607.53 692,172.43 70°17'48.814 N 148°26'37.36 W 2,981.00 11.72 324.77 2,978.90 11.11 -30.31 5,960,612.02 692,168.79 70°17'48.860 N 148°26'37.46 W 3,011.00 13.03 327.87 3,008.20 16.46 -33.87 5,960,617.28 692,165.10 70°17'48.912 N 148°26'37.56 W 3,047.00 14.06 327.89 3,043.20 23.60 -38.35 5,960,624.30 692,160.43 70°17'48.982 N 148°26'37.69 W 3,077.00 14.58 329.06 3,072.27 29.93 -42.23 5,960,630.53 692,156.39 70°17'49.045 N 148°26'37.81 W 3,107.00 15.43 329.58 3,101.25 36.61 -46.19 5,960,637.10 692,152.26 70°17'49.110 N 148°26'37.92 W 3,143.86 17.10 330.28 3,136.63 45.54 -51.36 5,960,645.90 692,146.87 70°17'49.198 N 148°26'38.07 W 3,178.92 18.45 331.09 3,170.02 54.88 -56.60 5,960,655.10 692,141.39 70°17'49.290 N 148°26'38.22 W 3,208.91 19.80 331.56 3,198.35 63.50 -61.31 5,960,663.60 692,136.46 70°17'49.375 N 148°26'38.36 W 3,237.87 20.98 332.80 3,225.49 72.42 -66.02 5,960,672.40 692,131.53 70°17'49.463 N 148°26'38.50 W 3,272.39 21.17 333.32 3,257.71 83.49 -71.64 5,960,683.31 692,125.62 70°17'49.571 N 148°28'38.66 W 3,303.73 21.92 333.44 3,286.86 93.78 -76.80 5,960,693.47 692,120.21 70°17'49.673 N 148°26'38.81 W 3,332.82 22.52 333.70 3,313.79 103.63 -81.69 5,960,703.19 692,115.06 70°17'49.769 N 148°26'38.96 W 3,367.51 23.81 333.16 3,345.68 115.83 -87.80 5,960,715.23 692,108.64 70°17'49.890 N 148°26'39.13 W 3,399.58 25.28 332.72 3,374.85 127.70 -93.86 5,960,726.94 692,102.28 70°17'50.006 N 148°26'39.31 W 3,427.85 26.92 332.02 3,400.24 138.71 -99.63 5,960,737.80 692,096.23 70°17'50.115 N 148°26'39.48 W 3,462.63 26.96 331.74 3,431.24 152.61 -107.06 5,960,751.50 692,088.45 70°17'50.251 N 148°26'39.69 W 3,494.77 27.80 331.65 3,459.78 165.62 -114.06 5,960,764.33 692,081.11 70°17'50.379 N 148°26'39.90 W 3,522.78 28.57 331.40 3,484.47 177.25 -120.37 5,960,775.80 692,074.51 70°17'50.494 N 148°26'40.08 W 3,557.67 29.45 332.07 3,514.98 192.16 -128.38 5,960,790.49 692,066.12 70°17'50.640 N 148°26'40.32 W 3,588.86 30.45 332.79 3,542.01 205.96 -135.59 5,960,804.10 692,058.57 70°17'50.776 N 148°26'40.53 W 3,617.27 31.23 333.16 3,566.40 218.93 -142.21 5,960,816.90 692,051.62 70°17'50.903 N 148°26'40.72 W 3,651.25 32.43 333.54 3,595.27 234.95 -150.24 5,960,832.71 692,043.18 70°17'51.061 N 148°26'40.95 W 3,682.45 33.87 332.91 3,621.39 250.18 -157.93 5,960,847.74 692,035.10 70°17'51.211 N 148°26'41.18 W 3,712.35 34.86 333.14 3,646.07 265.22 -165.59 5,960,862.58 692,027.07 70°17'51.359 N 148°26'41.40 W 3,745.28 36.14 332.83 3,672.88 282.26 -174.27 5,960,879.38 692,017.95 70°17'51.526 N 148°26'41.65 W 3,777.03 37.40 332.46 3,698.31 299.14 -183.01 5,960,896.03 692,008.79 70°17'51.692 N 148°26'41.91 W 3,806.24 38.08 332.72 3,721.41 315.01 -191.24 5,960,911.69 692,000.15 70°17'51.846 N 148°26'42.15 W 3,840.71 38.94 332.90 3,748.38 334.10 -201.04 5,960,930.52 691,989.86 70°17'52.036 N 148°26'42.43 W 3,871.85 39.98 332.93 3,772.43 351.72 -210.05 5,960,947.90 691,980.40 70°17'52.209 N 148°26'42.70 W 3,902.83 41.07 333.28 3,795.97 369.67 -219.16 5,960,965.62 691,970.84 70°17'52.386 N 148°26'42.96 W 3,935.74 42.41 333.68 3,820.53 389.28 -228.94 5,960,984.96 691,960.56 70°17'52.579 N 148°26'43.25 W 3,966.35 43.52 334.30 3,842.93 408.03 -238.09 5,961,003.47 691,950.94 70°17'52.763 N 148°26'43.51 W 3,996.78 44.35 334.93 3,864.84 427.10 -247.14 5,961,022.31 691,941.41 70°17'52.951 N 148°26'43.78 W 4,093.33 47.87 335.28 3,931.77 490.21 276.42 5,961,084.64 691,910.52 70°17'53.571 N 148°28'44.63 W 4,139.84 49.21 335.21 3,962.56 521.86 291.01 5,961,115.91 691,895.12 70°17'53.883 N 148°26'45.06 W 4,173.77 49.85 335.53 3,984.58 545.32 -301.77 5,961,139.09 691,883.77 70°17'54.113 N 148°26'45.37 W 4,199.79 50.31 334.93 4,001.28 563.44 -310.13 5,961,156.99 691,874.95 70°17'54.292 N 148°26'45.61 W 4,232.39 50.92 334.99 4,021.97 586.27 -320.80 5,961,179.53 691,863.71 70°17'54.516 N 148°26'45.93 W 4,268.90 52.02 334.61 4,044.71 612.11 -332.96 5,961,205.05 691,850.89 70°17'54.770 N 148°26'46.28 W 4,295.48 53.28 334.94 4,060.83 631.23 -341.96 5,961,223.93 691,841.40 70°17'54.958 N 148°26'46.54 W 4,331.33 54.95 334.75 4,081.85 657.52 -354.31 5,961,249.89 691,828.38 70°17'55.217 N 148°26'46.90 W 4,360.81 55.94 335.36 4,098.57 679.53 -364.55 5,961,271.64 691,817.59 70°17'55.433 N 148°26'47.20 W 4,390.35 56.88 335.05 4,114.91 701.87 -374.87 5,961,293.70 691,806.70 70°17'55.653 N 148°26'47.50 W 7/24/2014 1 53 48P Page 3 COMPASS 5000.1 Build 61 ............. bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay ND Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11B Survey Calculation Method: Minimum Curvature Design: 18-11B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (0) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 4,423.75 57.86 335.60 4,132.92 727.43 -386.61 5,961,318.95 691,794.31 70°17'55.904 N 148°26'47.84 W 4,457.74 58.84 335.09 4,150.76 753.73 -398.68 5,961,344.93 691,781.57 70°17 56.163 N 148°26'48.20 W 4,484.59 59.49 335.16 4,164.52 774.64 -408.38 5,961,365.59 691,771.34 70°17 56.369 N 148°26'48.48 W 4,579.83 61.61 335.12 4,211.34 849.89 -443.24 5,961,439.91 691,734.57 70°17'57.109 N 148°26'49.50 W 4,674.66 61.67 336.26 4,256.39 925.93 -477.59 5,961,515.05 691,698.28 70°17 57.857 N 148°26'50.50 W 4,769.87 61.60 336.14 4,301.62 1,002.59 -511.40 5,961,590.81 691,662.53 70°17'58.611 N 148°26'51.48 W 4,865.59 61.57 336.51 4,347.17 1,079.69 -545.21 5,961,667.02 691,626.76 70°17'59.369 N 148°26'52.47 W 4,961.12 61.54 337.21 4,392.67 1,156.93 -578.22 5,961,743.39 691,591.79 70°18'0.128 N 148°26'53.43 W 5,056.13 61.53 337.19 4,437.96 1,233.93 -610.58 5,961,819.53 691,557.47 70°18'0.886 N 148°26'54.37 W 5,150.34 61.63 336.84 4,482.79 1,310.21 -642.94 5,961,894.95 691,523.18 70°18'1.636 N 148°26'55.32 W j 5,245.82 60.98 337.09 4,528.64 1,387.28 -675.71 5,961,971.16 691,488.44 70°18'2.394 N 148°26'56.27 W 5,340.41 60.67 336.74 4,574.75 1,463.26 -708.09 5,962,046.28 691,454.13 70°18'3.141 N 148°26'57.22 W 5,435.83 60.09 337.66 4,621.91 1,539.72 -740.24 5,962,121.89 691,420.04 70°18'3.893 N 148°26'58.16 W 5,530.66 60.18 337.17 4,669.13 1,615.65 -771.82 5,962,196.98 691,386.53 70°18'4.640 N 148°26'59.08 W 5,625.36 59.97 336.43 4,716.38 1,691.09 -804.15 5,962,271.56 691,352.28 70°18'5.382 N 148°27'0.02 W 5,720.68 59.92 334.95 4,764.12 1,766.28 -838.12 5,962,345.85 691,316.41 70°18'6.121 N 148°27'1.01 W 5,815.15 59.95 332.83 4,811.45 1,839.69 -874.10 5,962,418.31 691,278.57 70°18'6.843 N 148°27'2.06 W 5,910.21 59.89 330.40 4,859.10 1,912.05 -913.20 5,962,489.65 691,237.63 70°18'7.555 N 148°27'3.20 W 6,004.76 59.91 328.44 4,906.52 1,982.46 -954.81 5,962,558.97 691,194.23 70°18'8.247 N 148°27'4.41 W 18-11B PB2 TIP 6,036.00 60.03 327.98 4,922.15 2,005.45 -969.06 5,962,581.59 691,179.40 70°18'8.473 N 148°27'4.83 W 18-11B PB2 TOW 6,099.13 59.37 329.74 4,954.01 2,052.10 -997.24 5,962,627.50 691,150.03 70°18'8.932 N 148°27'5.65 W 6,193.64 59.24 326.55 5,002.26 2,121.12 -1,040.13 5,962,695.39 691,105.40 70°18'9.611 N 148°27'6.90 W 6,289.53 59.24 323.08 5,051.31 2,188.45 -1,087.59 5,962,761.48 691,056.23 70°18'10.273 N 148°27'8.29 W 6,383.80 59.31 319.82 5,099.49 2,251.81 -1,138.09 5,962,823.53 691,004.14 70°18'10.896 N 148°27'9.76 W 6,478.40 59.05 318.24 5,147.96 2,313.15 -1,191.35 5,962,883.48 690,949.33 70°18'11.499 N 148°27'11.31 W 6,573.37 59.06 317.84 5,196.79 2,373.72 -1,245.81 5,962,942.63 690,893.34 70°18'12.095 N 148°27'12.90 W 6,668.39 59.01 318.43 5,245.68 2,434.39 -1,300.19 5,963,001.90 690,837.43 70°18'12.691 N 148°27'14.49 W 6,763.91 59.05 319.73 5,294.84 2,496.28 -1,353.83 5,963,062.39 690,782.23 70°18'13.300 N 148°27'16.05 W 6,857.57 59.05 321.11 5,343.01 2,558.19 -1,405.01 5,963,122.96 690,729.48 70°18'13.909 N 148°27'17.54 W 6,952.57 59.08 322.71 5,391.85 2,622.32 -1,455.27 5,963,185.78 690,677.60 70°18'14.539 N 148°27'19.01 W 7,047.72 59.51 324.88 5,440.43 2,688.33 -1,503.59 5,963,250.53 690,627.61 70°18'15.188 N 148°27'20.42 W 7,142.15 60.13 330.18 5,487.93 2,757.16 -1,547.38 5,963,318.22 690,582.08 70°18'15.865 N 148°27'21.69 W 7,237.78 60.10 332.30 5,535.58 2,829.84 -1,587.27 5,963,389.85 690,540.35 70°18'16.580 N 148°27'22.86 W 7,332.51 60.05 332.68 5,582.84 2,902.66 -1,625.19 5,963,461.67 690,500.58 70°18'17.296 N 148°27'23.96 W 7,427.19 60.06 333.04 5,630.10 2,975.67 -1,662.62 5,963,533.69 690,461.30 70°18'18.014 N 148°27'25.06 W 7,522.09 60.16 333.30 5,677.40 3,049.09 -1,699.75 5,963,606,14 690,422.30 70°18'18.736 N 148°27'26.14 W 7,616.81 60.08 333.22 5,724.58 3,122.43 -1,736.70 5,963,678.51 690,383.49 70°18'19.457 N 148°27'27.22 W 7,711.08 60.33 333.28 5,771.43 3,195.49 -1,773.53 5,963,750.59 690,344.81 70°18'20.176 N 148°27'28.29 W 7,805.90 60.16 333.72 5,818.48 3,269.16 -1,810.26 5,963,823.29 690,306.21 70°18'20.900 N 148°27'29.36 W 7,899.80 60.12 333.67 5,865.24 3,342.16 -1,846.34 5,963,895.34 690,268.27 70°18'21.618 N 148°27'30.42 W 7,995.19 60.19 333.65 5,912.71 3,416.31 -1,883.06 5,963,968.53 690,229.68 70°18'22.347 N 148°27'31.49 W 8,089.96 60.13 333.96 5,959.86 3,490.07 -1,919.34 5,964,041.33 690,191.52 70°18'23.073 N 148°27'32.55 W 8,184.12 61.31 334.69 6,005.91 3,564.09 -1,954.92 5,964,114.41 690,154.06 70°18'23.800 N 148°27'33.58 W 8,279.76 61.96 335.80 6,051.35 3,640.51 -1,990.16 5,964,189.91 690,116.88 70°18'24.552 N 148°27'34.61 W 8,374.33 61.88 337.43 6,095.87 3,717.09 -2,023.28 5,964,265.61 690,081.82 70°18'25.305 N 148°27'35.58 W 8,469.25 62.68 338.00 6,140.02 3,794.84 -2,055.14 5,964,342.52 690,047.98 70°18'26.070 N 148°27'36.51 W 8,563.91 63.99 338.30 6,182.50 3,873.36 -2,086.62 5,964,420.19 690,014.50 70°18'26.842 N 148°27'37.43 W 8,658.51 65.52 337.19 6,222.85 3,952.54 -2,119.03 5,964,498.52 689,980.08 70°18'27.620 N 148°27'38.37 W 8,754.39 66.69 336.07 6,261.68 4,033.01 -2,153.80 5,964,578.07 689,943.26 70°18'28.412 N 148°27'39.39 W 8,848.60 67.80 334.69 6,298.13 4,111.98 -2,190.00 5,964,656.08 689,905.06 70°18'29.188 N 148°27'40.44 W ' 8,943.23 68.91 334.61 6,333.03 4,191.47 -2,227.66 5,964,734.58 689,865.38 70°18'29.970 N 148°27'41.54 W 9,038.01 70.06 334.71 6,366.24 4,271.69 -2,265.65 5,964,813.80 689,825.36 70°18'30.759 N 148°27'42.65 W 9,132.94 71.24 336.06 6,397.70 4,353.12 -2,302.95 5,964,894.24 689,785.99 70°18'31.560 N148°27'43.74 W 7/24/2014 1:53:48PM Page 4 COMPASS 5000.1 Build 61 ri- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-116 @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-116 @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 B Survey Calculation Method: Minimum Curvature Design: 18-116 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,227.91 72.18 338.24 6,427.51 4,436.21 -2,337.96 5,964,976.40 689,748.87 70°18'32.377 N 148°27'44.76 W 9,323.74 73.49 338.72 6,455.79 4,521.39 -2,371.54 5,965,060.69 689,713.12 70°18'33.214 N 148°27'45.74 W 9,418.70 74.13 339.00 6,482.26 4,606.44 -2,404.43 5,965,144.87 689,678.07 70°18'34.051 N 148°27'46.70 W 9,512.90 74.07 339.01 6,508.07 4,691.03 -2,436.89 5,965,228.59 689,643.46 70°18'34.882 N 148°27'47.65 W 9,607.92 74.13 339.18 6,534.10 4,776.40 -2,469.50 5,965,313.09 689,608.68 70°18'35.722 N 148°27'48.60 W 9,701.98 74.16 338.59 6,559.80 4,860.80 -2,502.09 5,965,396.63 689,573.94 70°18'36.552 N 148°27'49.55 W 9,797.22 74.13 338.60 6,585.82 4,946.10 -2,535.53 5,965,481.04 689,538.33 70°18'37.391 N 148°27'50.53 W 9,892.56 74.13 338.59 6,611.89 5,031.48 -2,569.00 5,965,565.54 689,502.69 70°18'38.230 N 148°27'51.51 W 9,986.74 74.16 339.18 6,637.62 5,115.99 -2,601.64 5,965,649.18 689,467.91 70°18'39.061 N 148°27'52.46 W 10,081.37 74.13 339.68 6,663.48 5,201.22 -2,633.62 5,965,733.56 689,433.76 70°18'39.899 N 148°27'53.39 W 10,176.20 74.10 339.60 6,689.43 5,286.73 -2,665.35 5,965,818.22 689,399.85 70°18'40.740 N 148°27'54.32 W 10,271.21 74.14 339.49 6,715.43 5,372.35 -2,697.29 5,965,903.00 689,365.74 70°18'41.582 N 148°27'55.25 W 10,365.73 74.17 338.94 6,741.24 5,457.36 -2,729.56 5,965,987.15 689,331.31 70°18'42.418 N 148°27'56.19 W 10,461.50 74.16 338.91 6,767.37 5,543.33 -2,762.69 5,966,072.24 689,295.99 70°18'43.264 N 148°27'57.16 W 10,556.13 74.13 339.16 6,793.22 5,628.34 -2,795.26 5,966,156.38 689,261.26 70°18'44.100 N 148°27'58.11 W 10,651.34 74.10 338.50 6,819.28 5,713.73 -2,828.33 5,966,240.89 689,226.02 70°18'44.939 N 148°27'59.08 W 10,746.21 73.91 338.05 6,845.42 5,798.45 -2,862.08 5,966,324.72 689,190.11 70°18'45.772 N 148°28'0.06 W 10,841.08 73.88 337.68 6,871.74 5,882.88 -2,896.43 5,966,408.24 689,153.62 70°18'46.603 N 148°28'1.07 W 10,935.95 73.94 337.17 6,898.03 5,967.05 -2,931.42 5,966,491.48 689,116.49 70°18'47.430 N 148°28'2.09 W 11,031.10 74.00 337.13 6,924.31 6,051.32 -2,966.93 5,966,574.81 689,078.83 70°18'48.259 N 148°28'3.13 W 11,125.84 73.98 337.63 6,950.44 6,135.38 -3,001.96 5,966,657.94 689,041.67 70°18'49.086 N 148°28'4.15 W 11,221.03 73.94 338.05 6,976.74 6,220.11 -3,036.46 5,966,741.75 689,005.01 70°18'49.919 N 148°28'5.16 W 11,315.91 73.88 338.36 7,003.04 6,304.76 -3,070.31 5,966,825.50 688,969.01 70°18'50.751 N 148°28'6.14 W 11,410.83 73.90 338.82 7,029.38 6,389.66 -3,103.60 5,966,909.52 688,933.56 70°18'51.586 N 148°28'7.12 W 11,506.01 73.91 339.13 7,055.76 6,475.02 -3,136.41 5,966,994.01 688,898.58 70°18'52.425 N 148°28'8.07 W 11,599.00 73.91 339.53 7,081.53 6,558.61 -3,167.95 5,967,076.76 688,864.92 70°18'53.247 N 148°28'9.00 W 11,695.88 73.94 339.92 7,108.36 6,645.94 -3,200.21 5,967,163.23 688,830.44 70°18'54.106 N 148°28'9.94 W 11,789.11 71.50 340.22 7,136.05 6,729.62 -3,230.55 5,967,246.10 688,797.97 70°18'54.929 N 148°28'10.82 W 11,885.09 68.42 339.88 7,168.94 6,814.37 -3,261.31 5,967,330.03 688,765.05 70°18'55.762 N 148°28'11.72 W 11,979.38 65.65 340.17 7,205.72 6,895.95 -3,290.97 5,967,410.83 688,733.32 70°18'56.565 N 148°28'12.59 W 12,074.69 63.09 340.34 7,246.95 6,976.83 -3,320.00 5,967,490.93 688,702.24 70°18'57.360 N 148°28'13.44 W 12,169.59 59.91 340.30 7,292.22 7,055.34 -3,348.08 5,967,568.70 688,672.16 70°18'58.132 N 148°28'14.26 W 12,264.81 56.33 339.69 7,342.50 7,131.31 -3,375.73 5,967,643.93 688,642.58 70°18'58.879 N 148°28'15.07 W 12,359.53 53.98 339.29 7,396.62 7,204.12 -3,402.96 5,967,716.01 688,613.49 70°18'59.595 N 148°28'15.86 W 12,454.36 53.17 338.68 7,452.93 7,275.34 -3,430.32 5,967,786.51 688,584.32 70°19'0.295 N 148°28'16.66 W 12,549.29 51.34 338.30 7,511.04 7,345.18 -3,457.84 5,967,855.62 688,555.03 70°19'0.982 N 148°28'17.46 W 12,644.17 47.29 338.05 7,572.88 7,411.96 -3,484.58 5,967,921.68 688,526.59 70°19'1.639 N 148°28'18.24 W 12,739.40 44.28 337.75 7,639.28 7,475.19 -3,510.25 5,967,984.24 688,499.31 70°19'2.260 N 148°28'18.99 W 12,833.51 42.77 337.92 7,707.51 7,535.21 -3,534.70 5,968,043.61 688,473.33 70°19'2.851 N 148°28'19.71 W 12,928.26 39.20 338.12 7,779.03 7,592.83 -3,557.96 5,968,100.61 688,448.61 70°19'3.417 N 148°28'20.39 W 13,022.63 35.18 338.09 7,854.19 7,645.74 -3,579.23 5,968,152.96 688,426.00 70°19'3.937 N 148°28'21.01 W 13,117.49 35.20 338.66 7,931.71 7,696.56 -3,599.37 5,968,203.24 688,404.56 70°19'4.437 N 148°28'21.60 W 13,212.12 34.95 338.65 8,009.16 7,747.21 -3,619.17 5,968,253.37 688,383.48 70°19'4.935 N 148°28'22.18 W 13,306.67 34.52 338.87 8,086.86 7,797.42 -3,638.68 5,968,303.06 688,362.69 70°19'5.429 N 148°28'22.75 W 13,399.65 34.79 339.46 8,163.34 7,846.84 -3,657.49 5,968,351.98 688,342.63 70°19'5.915 N 148°28'23.30 W 13,414.60 35.17 339.03 8,175.59 7,854.85 -3,660.53 5,968,359.91 688,339.39 70°19'5.994 N 148°28'23.38 W 13,478.38 36.00 337.73 8,227.46 7,889.35 -3,674.20 5,968,394.05 688,324.83 70°19'6.333 N 148°28'23.78 W 13,510.88 38.99 335.14 8,253.25 7,907.47 -3,682.12 5,968,411.96 688,316.45 70°19'6.511 N 148°28'24.02 W 13,542.57 41.50 332.60 8,277.43 7,925.84 -3,691.15 5,968,430.09 688,306.96 70°19'6.692 N 148°28'24.28 W 13,574.76 44.33 333.25 8,301.01 7,945.36 -3,701.12 5,968,449.34 688,296.49 70°19'6.884 N 148°28'24.57 W 18-11B TIP 13,640.21 44.45 334.88 8,347.78 7,986.53 -3,721.14 5,968,489.99 688,275.42 70°19'7.288 N 148°28'25.16 W 13,671.57 44.45 331.33 8,370.17 8,006.11 -3,731.07 5,968,509.31 688,265.00 70°19'7.481 N 148°28'25.45 W 13,703.00 44.41 327.85 8,392.62 8,025.08 -3,742.21 5,968,527.98 688,253.38 70°19'7.667 N 148°28'25.77 W 13,734.92 44.28 326.41 8,415.44 8,043.82 -3,754.32 5,968,546.40 688,240.80 70°19'7.852 N 148°28'26.12 W 7/24/2014 1:53:48PM Page 5 COMPASS 5000.1 Build 61 cc Fir bp Survey Report GeographicBAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay ND Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11B Survey Calculation Method: Minimum Curvature Design: 18-11B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EJ-W Northing Easting (usft) (°) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 13,766.42 45.26 326.01 8,437.81 8,062.26 -3,766.65 5,968,564.52 688,227.99 70°19'8.033 N 148°28'26.48 W 13,799.13 46.22 325.04 8,460.64 8,081.57 -3,779.92 5,968,583.48 688,214.24 70°19'8.223 N 148°28'26.87 W 13,831.35 48.02 323.55 8,482.56 8,100.73 -3,793.70 5,968,602.29 688,199.98 70°19'8.411 N 148°28'27.27 W 13,861.40 49.69 323.19 8,502.33 8,118.89 -3,807.20 5,968,620.10 688,186.02 70°19'8.590 N 148°28'27.67 W 13,892.86 50.72 323.55 8,522.47 8,138.29 -3,821.62 5,968,639.12 688,171.11 70°19'8.780 N 148°28'28.09 W 13,924.99 52.22 323.07 8,542.48 8,158.44 -3,836.64 5,968,658.88 688,155.58 70°19'8.979 N 148°28'28.53 W 13,956.02 53.66 322.83 8,561.18 8,178.21 -3,851.56 5,968,678.25 688,140.16 70°19'9.173 N 148°28'28.96 W 13,967.13 54.44 322.41 8,567.70 8,185.35 -3,857.02 5,968,685.26 688,134.52 70°19'9.243 N 148°28'29.12 W 13,999.73 57.21 323.07 8,586.01 8,206.82 -3,873.34 5,968,706.30 688,117.65 70°19'9.454 N 148°28'29.60 W 14,030.64 61.50 321.46 8,601.77 8,227.84 -3,889.62 5,968,726.89 688,100.84 70°19'9.661 N 148°28'30.08 W 14,063.89 66.31 320.68 8,616.39 8,251.06 -3,908.38 5,968,749.62 688,081.49 70°19'9.889 N 148°28'30.62 W 14,094.78 69.77 317.63 8,627.94 8,272.72 -3,927.12 5,968,770.80 688,062.21 70°19'10.102 N 148°28'31.17 W 14,126.22 73.83 315.39 8,637.76 8,294.37 -3,947.67 5,968,791.92 688,041.11 70°19'10.315 N 148°28'31.77 W 14,157.20 77.56 313.15 8,645.41 8,315.32 -3,969.17 5,968,812.31 688,019.09 70°19'10.521 N 148°28'32.40 W 14,187.97 78.82 312.04 8,651.71 8,335.70 -3,991.34 5,968,832.12 687,996.40 70°19'10.721 N 148°28'33.04 W 14,220.76 82.04 310.81 8,657.16 8,357.09 -4,015.58 5,968,852.88 687,971.62 70°19'10.931 N 148°28'33.75 W 14,252.12 85.23 309.60 8,660.64 8,377.21 -4,039.38 5,968,872.37 687,947.32 70°19'11.129 N 148°28'34.45 W 14,283.60 85.34 309.55 8,663.23 8,397.20 -4,063.56 5,968,891.74 687,922.63 70°19'11.325 N 148°28'35.15 W 14,315.13 85.28 308.82 8,665.80 8,417.05 -4,087.92 5,968,910.96 687,897.78 70°19'11.521 N 148°28'35.86 W 14,410.50 85.34 309.32 8,673.60 8,476.96 -4,161.72 5,968,968.96 687,822.48 70°19'12.109 N 148°28'38.02 W 14,504.82 89.74 308.40 8,677.65 8,536.07 -4,235.08 5,969,026.17 687,747.64 70°19'12.690 N 148°28'40.16 W 14,526.30 89.45 309.84 8,677.80 8,549.62 -4,251.74 5,969,039.29 687,730.63 70°19'12.824 N 148°28'40.65 W 14,621.40 90.12 309.62 8,678.16 8,610.40 -4,324.88 5,969,098.18 687,655.97 70°19'13.421 N 148°28'42.78 W 14,715.21 90.21 306.23 8,677.89 8,668.05 -4,398.86 5,969,153.91 687,580.54 70°19'13.987 N 148°28'44.94 W 14,810.27 90.21 304.00 8,677.54 8,722.73 -4,476.62 5,969,206.58 687,501.41 70°19'14.525 N 148°28'47.21 W 1 14,903.57 90.18 299.36 8,677.22 8,771.71 -4,555.99 5,969,253.52 687,420.82 70°19'15.006 N 148°28'49.53 W 14,935.49 90.09 297.48 8,677.15 8,786.90 -4,584.06 5,969,267.98 687,392.37 70°19'15.155 N 148°28'50.35 W 14,967.80 90.21 295.99 8,677.06 8,801.44 -4,612.92 5,969,281.78 687,363.15 70°19'15.298 N 148°28'51.19 W 14,998.19 90.15 294.88 8,676.97 8,814.49 -4,640.36 5,969,294.12 687,335.38 70°19'15.426 N 148°28'51.99 W 15,092.98 90.15 292.90 8,676.72 8,852.88 -4,727.03 5,969,330.28 687,247.77 70°19'15.803 N 148°28'54.52 W 15,188.36 90.09 290.21 8,676.52 8,887.92 -4,815.73 5,969,363.03 687,158.21 70°19'16.147 N 148°28'57.11 W 15,282.71 90.21 286.87 8,676.27 8,917.91 -4,905.17 5,969,390.73 687,068.04 70°19'16.442 N 148°28'59.72 W 15,377.24 90.12 286.42 8,676.00 8,944.99 -4,995.74 5,969,415.48 686,976.81 70°19'16.707 N 148°29'2.37 W 15,471.78 91.38 282.97 8,674.76 8,968.96 -5,087.16 5,969,437.11 686,884.81 70°19'16.943 N 148°29'5.03 W 1 15,567.12 89.45 280.40 8,674.07 8,988.27 -5,180.51 5,969,454.02 686,791.00 70°19'17.132 N 148°29'7.76 W 15,661.79 88.71 277.66 8,675.59 9,003.13 -5,273.99 5,969,466.48 686,697.18 70°19'17.277 N 148°29'10.49 W 15,756.62 89.02 275.21 8,677.47 9,013.75 -5,368.19 5,969,474.69 686,602.74 70°19'17.381 N 148°29'13.24 W 15,851.27 89.20 272.58 8,678.94 9,020.18 -5,462.60 5,969,478.70 686,508.20 70°19'17.444 N 148°29'15.99 W 15,945.91 88.68 269.90 8,680.69 9,022.23 -5,557.20 5,969,478.33 686,413.59 70°19'17.463 N 148°29'18.75 W 16,040.83 89.08 270.76 8,682.55 9,022.77 -5,652.10 5,969,476.45 686,318.71 70°19'17.468 N 148°29'21.52 W 16,135.45 89.60 267.89 8,683.64 9,021.66 -5,746.69 5,969,472.92 686,224.18 70°19'17.456 N 148°29'24.28 W 16,230.92 89.94 264.82 8,684.02 9,015.59 -5,841.96 5,969,464.41 686,129.11 70°19'17.396 N 148°29'27.06 W 16,266.13 90.46 264.28 8,683.90 9,012.25 -5,877.01 5,969,460.18 686,094.16 70°19'17.363 N 148°29'28.09 W 16,327.07 90.92 263.68 8,683.16 9,005.86 -5,937.61 5,969,452.24 686,033.75 70°19'17.299 N 148°29'29.85 W 16,421.83 90.06 262.45 8,682.35 8,994.41 -6,031.67 5,969,438.40 685,940.01 70°19'17.186 N 148°29'32.60 W 16,453.44 90.09 261.04 8,682.31 8,989.88 -6,062.95 5,969,433.06 685,908.86 70°19'17.141 N 148°29'33.51 W 16,486.65 89.48 258.91 8,682.44 8,984.10 -6,095.65 5,969,426.44 685,876.32 70°19'17.084 N 148°29'34.47 W 16,516.94 89.38 257.16 8,682.74 8,977.82 -6,125.28 5,969,419.41 685,846.86 70°19'17.022 N 148°29'35.33 W 1 16,609.43 89.05 256.65 8,684.00 8,956.86 -6,215.36 5,969,396.16 685,757.36 70°19'16.815 N 148°29'37.96 W 16,705.26 89.11 260.94 8,685.54 8,938.25 -6,309.33 5,969,375.15 685,663.90 70°19'16.632 N 148°29'40.70 W 11 16,800.71 89.05 262.05 8,687.08 8,924.13 -6,403.71 5,969,358.63 685,569.91 70°19'16.492 N 148°29'43.45 W 16,894.64 88.99 263.74 8,688.68 8,912.52 -6,496.90 5,969,344.63 685,477.05 70°19'16.377 N 148°29'46.17 W 16,988.63 89.02 264.66 8,690.32 8,903.02 -6,590.40 5,969,332.75 685,383.84 70°19'16.283 N 148°29'48.90 W 17,085.32 89.94 266.29 8,691.19 8,895.39 -6,686.78 5,969,322.66 685,287.69 70°19'16.207 N 148°29'51.71 W 17,179.01 91.53 268.86 8,689.99 8,891.43 -6,780.37 5,969,316.31 685,194.24 70°19'16.167 N 148°29'54.45 W 7/24/2014 1:53:48PM Page 6 COMPASS 5000.1 Build 61 IrIr- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) ' Well: 18-11 North Reference: True Wellbore: 18-11B Survey Calculation Method: Minimum Curvature - Design: 18-11 B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 17,274.23 91.90 269.85 8,687.14 8,890.36 -6,875.54 5,969,312.80 685,099.13 70°19'16.156 N 148°29'57.22 W 17,370.03 91.96 268.75 8,683.91 8,889.19 -6,971.27 5,969,309.18 685,003.46 70°19'16.143 N 148°30'0.02 W 17,465.79 91.90 268.11 8,680.69 8,886.57 -7,066.94 5,969,304.12 684,907.90 70°19'16.117 N 148°30'2.81 W 17,560.66 89.02 267.81 8,679.93 8,883.19 -7,161.74 5,969,298.32 684,813.22 70°19'16.083 N 148°30'5.58 W 17,655.35 89.08 267.49 8,681.50 8,879.31 -7,256.34 5,969,292.02 684,718.76 70°19'16.043 N 148°30'8.34 W 17,750.11 89.05 266.80 8,683.04 8,874.59 -7,350.96 5,969,284.88 684,624.29 70°19'15.996 N 148°30'11.10 W 17,844.77 89.05 266.32 8,684.61 8,868.91 -7,445.44 5,969,276.79 684,530.00 70°19'15.939 N 148°30'13.85 W 17,939.90 88.92 269.18 8,686.30 8,865.18 -7,540.47 5,969,270.62 684,435.10 70°19'15.902 N 148°30'16.63 W 18,035.62 89.05 268.49 8,688.00 8,863.23 -7,636.16 5,969,266.23 684,339.50 70°19'15.882 N 148°30'19.42 W 18,130.49 88.49 268.13 8,690.03 8,860.43 -7,730.96 5,969,261.01 684,244.80 70°19'15.853 N 148°30'22.19 W 18,224.76 88.55 266.71 8,692.47 8,856.19 -7,825.10 5,969,254.36 684,150.80 70°19'15.811 N 148°30'24.93 W 18,319.51 88.03 266.15 8,695.29 8,850.29 -7,919.63 5,969,246.05 684,056.47 70°19'15.752 N 148°30'27.69 W 18,414.11 87.97 265.67 8,698.60 8,843.55 -8,013.93 5,969,236.90 683,962.37 70°19'15.684 N 148°30'30.44 W 18,509.24 87.94 265.50 8,701.99 8,836.23 -8,108.72 5,969,227.16 683,867.81 70°19'15.611 N 148°30'33.21 W 18,604.23 90.70 265.39 8,703.12 8,828.69 -8,203.39 5,969,217.20 683,773.37 70°19'15.536 N 148°30'35.97 W 18,699.17 92.30 265.32 8,700.63 8,821.00 -8,297.98 5,969,207.10 683,679.01 70°19'15.459 N 148°30'38.73 W 18,793.94 93.84 266.40 8,695.56 8,814.17 -8,392.37 5,969,197.85 683,584.84 70°19'15.391 N 148°30'41.49 W 18,888.68 94.02 268.60 8,689.06 8,810.05 -8,486.79 5,969,191.32 683,490.56 70°19'15.350 N 148°30'44.24 W 18,984.68 91.87 267.81 8,684.13 8,807.05 -8,582.61 5,969,185.87 683,394.85 70°19'15.319 N 148°30'47.04 W 19,079.20 94.49 267.91 8,678.89 8,803.52 -8,676.91 5,969,179.93 683,300.68 70°19'15.283 N 148°30'49.79 W 19,174.34 97.85 267.88 8,668.66 8,800.05 -8,771.42 5,969,174.04 683,206.29 70°19'15.248 N 148°30'52.55 W 19,270.04 97.95 268.28 8,655.51 8,796.87 -8,866.16 5,969,168.44 683,111.67 70°19'15.216 N 148°30'55.31 W 19,364.18 97.79 267.23 8,642.62 8,793.22 -8,959.34 5,969,162.41 683,018.62 70°19'15.179 N 148°30'58.03 W 19,459.78 97.79 266.22 8,629.66 8,787.81 -9,053.90 5,969,154.58 682,924.23 70°19'15.124 N 148°31'0.79 W - 19,493.00 97.79 266.22 8,625.16 , 8,785.64 -9,086.74 5,969,151.57 682,891.46 70°19'15.103 N 148°31'1.75 W Projection to TD 7/24/2014 1:53:48PM Page 7 COMPASS 5000.1 Build 61 0 bp North America - ALASKA - BP Prudhoe Bay PB DS 18 18-11 500292118100 18-11 BPB1 Design: 18-11 BPB1 Survey Report - Geographic 24 July, 2014 BAKER HUGHES 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 BPB1 Survey Calculation Method: Minimum Curvature Design: 18-11BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15 usft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44 usft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.46 ° Well 18-11 API No. 500292118100 Well Position +N/-S 0.00 usft Northing: 5,960,601.69 usft Latitude: 70°17'48.750 N +E/-W 0.00 usft Easting: 692,199.37 usft Longitude: 148°26'36.57 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 17.40 usft Wellbore 18-11BPB1 API no. 500292118170 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2013 5/12/2014 19.91 81.02 57,635 Design 18-11BPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 2,654.05 Vertical Section: Depth From(TVD) +N/-5 +E/-W Direction (usft) (usft) (usft) (°) 48.50 0.00 0.00 332.70 Survey Program Date: 7/24/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 57.50 2,654.05 Survey#1 GCT Gyro MS(18-11 DPN) GCT-MS Schlumberger GCT multishot 2,666.00 3,107.00 Gyro MS(18-11BPB1) GYD-CT-CMS Gyrodata cont.casing m/s 3,143.86 6,640.30 MWD(18-11BPB1) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 7/24/2014 10:03:58AM Page 2 COMPASS 5000.1 Build 61 r�- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11BPB1 Survey Calculation Method: Minimum Curvature Design: 18-11BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (*) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 2,654.05 2.10 234.30 2,653.97 -2.09 -6.69 5,960,599.43 692,192.73 70°17'48.730 N 148°26'36.77 W 18-11B PB1 TIP 2,666.00 2.14 202.62 2,665.92 -2.42 -6.96 5,960,599.09 692,192.48 70°17'48.726 N 148°26'36.78 W 2,696.00 2.47 189.25 2,695.89 -3.58 -7.28 5,960,597.93 692,192.19 70°17'48.715 N 148°26'36.79 W 2,726.00 2.01 223.00 2,725.87 -4.60 -7.74 5,960,596.89 692,191.75 70°17'48.705 N 148°26'36.80 W 2,761.00 3.40 263.77 2,760.83 -5.16 -9.19 5,960,596.30 692,190.31 70°17'48.700 N 148°26'36.84 W 2,791.00 4.54 281.32 2,790.76 -5.02 -11.24 5,960,596.38 692,188.26 70°17'48.701 N 148°26'36.90 W 2,821.00 5.44 290.61 2,820.65 -4.29 -13.74 5,960,597.05 692,185.75 70°17'48.708 N 148°26'36.97 W 2,857.00 6.31 300.16 2,856.46 -2.70 -17.04 5,960,598.56 692,182.40 70°17'48.724 N 148°26'37.07 W 2,887.00 7.29 309.76 2,886.25 -0.65 -19.93 5,960,600.53 692,179.46 70°17'48.744 N 148°26'37.16 W 2,917.00 8.87 316.53 2,915.95 2.25 -22.99 5,960,603.35 692,176.33 70°17'48.772 N 148°26'37.24 W 2,951.00 10.52 319.93 2,949.46 6.52 -26.79 5,960,607.53 692,172.43 70°17'48.814 N 148°26'37.36 W 2,981.00 11.72 324.77 2,978.90 11.11 -30.31 5,960,612.02 692,168.79 70°17'48.860 N 148°26'37.46 W 3,011.00 13.03 327.87 3,008.20 16.46 -33.87 5,960,617.28 692,165.10 70°17'48.912 N 148°26'37.56 W 3,047.00 14.06 327.89 3,043.20 23.60 -38.35 5,960,624.30 692,160.43 70°17'48.982 N 148°26'37.69 W 3,077.00 14.58 329.06 3,072.27 29.93 -42.23 5,960,630.53 692,156.39 70°17'49.045 N 148°26'37.81 W 3,107.00 15.43 329.58 3,101.25 36.61 -46.19 5,960,637.10 692,152.26 70°17'49.110 N 148°26'37.92 W 3,143.86 17.10 330.28 3,136.63 45.54 -51.36 5,960,645.90 692,146.87 70°17'49.198 N 148°26'38.07 W 3,178.92 18.45 331.09 3,170.02 54.88 -56.60 5,960,655.10 692,141.39 70°17'49.290 N 148°26'38.22 W 3,208.91 19.80 331.56 3,198.35 63.50 -61.31 5,960,663.60 692,136.46 70°17'49.375 N 148°26'38.36 W 3,237.87 20.98 332.80 3,225.49 72.42 -66.02 5,960,672.40 692,131.53 70°17'49.463 N 148°26'38.50 W 3,272.39 21.17 333.32 3,257.71 83.49 -71.64 5,960,683.31 692,125.62 70°17'49.571 N 148°26'38.66 W 3,303.73 21.92 333.44 3,286.86 93.78 -76.80 5,960,693.47 692,120.21 70°17'49.673 N 148°26'38.81 W 3,332.82 22.52 333.70 3,313.79 103.63 -81.69 5,960,703.19 692,115.06 70°17'49.769 N 148°26'38.96 W 3,367.51 23.81 333.16 3,345.68 115.83 -87.80 5,960,715.23 692,108.64 70°17'49.890 N 148°26'39.13 W 3,399.58 25.28 332.72 3,374.85 127.70 -93.86 5,960,726.94 692,102.28 70°17'50.006 N 148°26'39.31 W 3,427.85 26.92 332.02 3,400.24 138.71 -99.63 5,960,737.80 692,096.23 70°17'50.115 N 148°26'39.48 W 3,462.63 26.96 331.74 3,431.24 152.61 -107.06 5,960,751.50 692,088.45 70°17'50.251 N 148°26'39.69 W 3,494.77 27.80 331.65 3,459.78 165.62 -114.06 5,960,764.33 692,081.11 70°17'50.379 N 148°26'39.90 W 3,522.78 28.57 331.40 3,484.47 177.25 -120.37 5,960,775.80 692,074.51 70°17'50.494 N 148°26'40.08 W 3,557.67 29.45 332.07 3,514.98 192.16 -128.38 5,960,790.49 692,066.12 70°17'50.640 N 148°26'40.32 W 3,588.86 30.45 332.79 3,542.01 205.96 -135.59 5,960,804.10 692,058.57 70°17'50.776 N 148°26'40.53 W 3,617.27 31.23 333.16 3,566.40 218.93 -142.21 5,960,816.90 692,051.62 70°17'50.903 N 148°26'40.72 W 3,651.25 32.43 333.54 3,595.27 234.95 -150.24 5,960,832.71 692,043.18 70°17'51.061 N 148°26'40.95 W 3,682.45 33.87 332.91 3,621.39 250.18 -157.93 5,960,847.74 692,035.10 70°17'51.211 N 148°26'41.18 W 3,712.35 34.86 333.14 3,646.07 265.22 -165.59 5,960,862.58 692,027.07 70°17'51.359 N 148°26'41.40 W 3,745.28 36.14 332.83 3,672.88 282.26 -174.27 5,960,879.38 692,017.95 70°17'51.526 N 148°26'41.65 W 3,777.03 37.40 332.46 3,698.31 299.14 -183.01 5,960,896.03 692,008.79 70°17'51.692 N 148°26'41.91 W 3,806.24 38.08 332.72 3,721.41 315.01 -191.24 5,960,911.69 692,000.15 70°17'51.848 N 148°26'42.15 W 3,840.71 38.94 332.90 3,748.38 334.10 -201.04 5,960,930.52 691,989.86 70°17'52.036 N 148°26'42.43 W 3,871.85 39.98 332.93 3,772.43 351.72 -210.05 5,960,947.90 691,980.40 70°17'52.209 N 148°26'42.70 W 3,902.83 41.07 333.28 3,795.97 369.67 -219.16 5,960,965.62 691,970.84 70°17'52.386 N 148°26'42.96 W 3,935.74 42.41 333.68 3,820.53 389.28 -228.94 5,960,984.96 691,960.56 70°17'52.579 N 148°26'43.25 W 3,966.35 43.52 334.30 3,842.93 408.03 -238.09 5,961,003.47 691,950.94 70°17'52.763 N 148°26'43.51 W 3,996.78 44.35 334.93 3,864.84 427.10 -247.14 5,961,022.31 691,941.41 70°17'52.951 N 148°26'43.78 W 4,093.33 47.87 335.28 3,931.77 490.21 -276.42 5,961,084.64 691,910.52 70°17'53.571 N 148°26'44.63 W 4,139.84 49.21 335.21 3,962.56 521.86 -291.01 5,961,115.91 691,895.12 70°17'53.883 N 148°26'45.06 W 4,173.77 49.85 335.53 3,984.58 545.32 -301.77 5,961,139.09 691,883.77 70°17'54.113 N 148°26'45.37 W 4,199.79 50.31 334.93 4,001.28 563.44 -310.13 5,961,156.99 691,874.95 70°17'54.292 N 148°26'45.61 W 4,232.39 50.92 334.99 4,021.97 586.27 -320.80 5,961,179.53 691,863.71 70°17'54.516 N 148°26'45.93 W 4,268.90 52.02 334.61 4,044.71 612.11 -332.96 5,961,205.05 691,850.89 70°17'54.770 N 148°26'46.28 W 4,295.48 53.28 334.94 4,060.83 631.23 -341.96 5,961,223.93 691,841.40 70°17'54.958 N 148°26'46.54 W 4,331.33 54.95 334.75 4,081.85 657.52 -354.31 5,961,249.89 691,828.38 70°17'55.217 N 148°26'46.90 W 4,360.81 55.94 335.36 4,098.57 679.53 -364.55 5,961,271.64 691,817.59 70°17'55.433 N 148°26'47.20 W 4,390.35 56.88 335.05 4,114.91 701.87 -374.87 5,961,293.70 691,806.70 70°17'55.653 N 148°26'47.50 W 7/24/2014 10:03:58AM Page 3 COMPASS 5000.1 Build 61 rr 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 BPB1 Survey Calculation Method: Minimum Curvature Design: 18-11 BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +El-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 4,423.75 57.86 335.60 4,132.92 727.43 -386.61 5,961,318.95 691,794.31 70°17'55.904 N 148°26'47.84 W 4,457.74 58.84 335.09 4,150.76 753.73 -398.68 5,961,344.93 691,781.57 70°17'56.163 N 148°26'48.20 W 4,484.59 59.49 335.16 4,164.52 774.64 -408.38 5,961,365.59 691,771.34 70°17'56.369 N 148°26'48.48 W 4,579.83 61.61 335.12 4,211.34 849.89 -443.24 5,961,439.91 691,734.57 70°17'57.109 N 148°26'49.50 W 4,674.66 61.67 336.26 4,256.39 925.93 -477.59 5,961,515.05 691,698.28 70°17'57.857 N 148°26'50.50 W 4,769.87 61.60 336.14 4,301.62 1,002.59 -511.40 5,961,590.81 691,662.53 70°17'58.611 N 148°26'51.48 W 4,865.59 61.57 336.51 4,347.17 1,079.69 -545.21 5,961,667.02 691,626.76 70°17'59.369 N 148°26'52.47 W 4,961.12 61.54 337.21 4,392.67 1,156.93 -578.22 5,961,743.39 691,591.79 70°18'0.128 N 148°26'53.43 W 5,056.13 61.53 337.19 4,437.96 1,233.93 -610.58 5,961,819.53 691,557.47 70°18'0.886 N 148°26'54.37 W 5,150.34 61.63 336.84 4,482.79 1,310.21 -642.94 5,961,894.95 691,523.18 70°18'1.636 N 148°26'55.32 W 5,245.82 60.98 337.09 4,528.64 1,387.28 -675.71 5,961,971.16 691,488.44 70°18'2.394 N 148°26'56.27 W 5,340.41 60.67 336.74 4,574.75 1,463.26 -708.09 5,962,046.28 691,454.13 70°18'3.141 N 148°26'57.22 W 5,435.83 60.09 337.66 4,621.91 1,539.72 -740.24 5,962,121.89 691,420.04 70°18'3.893 N 148°26'58.16 W 5,530.66 60.18 337.17 4,669.13 1,615.65 -771.82 5,962,196.98 691,386.53 70°18'4.640 N 148°26'59.08 W 5,625.36 59.97 336.43 4,716.38 1,691.09 -804.15 5,962,271.56 691,352.28 70°18'5.382 N 148°27'0.02 W 5,720.68 59.92 334.95 4,764.12 1,766.28 -838.12 5,962,345.85 691,316.41 70°18'6.121 N 148°27'1.01 W 5,815.15 59.95 332.83 4,811.45 1,839.69 -874.10 5,962,418.31 691,278.57 70°18'6.843 N 148°27'2.06 W 5,910.21 59.89 330.40 4,859.10 1,912.05 -913.20 5,962,489.65 691,237.63 70°18'7.555 N 148°27'3.20 W 6,004.76 59.91 328.44 4,906.52 1,982.46 -954.81 5,962,558.97 691,194.23 70°18'8.247 N 148°27'4.41 W 6,098.25 60.27 327.06 4,953.14 2,051.00 -998.05 5,962,626.37 691,149.25 70°18'8.921 N 148°27'5.67 W 6,193.36 60.30 326.09 5,000.28 2,119.94 -1,043.55 5,962,694.12 691,102.01 70°18'9.599 N 148°27'7.00 W 6,289.20 60.06 326.21 5,047.94 2,188.99 -1,089.87 5,962,761.97 691,053.94 70°18'10.278 N 148°27'8.35 W 6,383.72 60.24 326.62 5,094.99 2,257.29 -1,135.22 5,962,829.08 691,006.87 70°18'10.950 N 148°27'9.67 W 6,477.92 60.12 326.75 5,141.83 2,325.58 -1,180.10 5,962,896.20 690,960.25 70°18'11.621 N 148°27'10.98 W 6,572.59 60.10 326.71 5,189.01 2,394.21 -1,225.13 5,962,963.65 690,913.48 70°18'12.296 N 148°27'12.30 W 6,640.30 60.12 326.44 5,222.75 2,443.20 -1,257.47 5,963,011.79 690,879.91 70°18'12.778 N 148°27'13.24 W 6,673.00 60.12 326.44 5,239.04 2,466.83 -1,273.14 5,963,035.01 690,863.64 70°18'13.010 N 148°27'13.70 W Projection to TD 7/24/2014 10:03,58AM Page 4 COMPASS 5000.1 Build 61 • bp North America - ALASKA - BP Prudhoe Bay PB DS 18 18-11 500292118100 18-11 BPB2 Design: 18-11 BPB2 Survey Report - Geographic 24 July, 2014 v1 BAKER HUGHES 4r- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11BPB2 Survey Calculation Method: Minimum Curvature Design: 18-11 BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15 usft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44 usft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.46 ° Well 18-11 API No. 500292118100 Well Position +N/-S 0.00 usft Northing: 5,960,601.69 usft Latitude: 70°17'48.750 N +E/-W 0.00 usft Easting: 692,199.37 usft Longitude: 148°26'36.57 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 17.40 usft Wellbore 18-11BPB2 API no. 500292118171 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2013 5/20/2014 19.90 81.02 57,635 Design 18-11BPB2 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 2,654.05 Vertical Section: Depth From(TVD) +N/-S +El-W Direction (usft) (usft) (usft) (°) 48.50 0.00 0.00 334.67 Survey Program Date: 7/24/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 57.50 2,654.05 Survey#1 GCT Gyro MS(18-11 DPN) GCT-MS Schlumberger GCT multishot 2,666.00 3,107.00 Gyro MS(18-11 BPB1) GYD-CT-CMS Gyrodata cont.casing m/s 3,143.86 6,004.76 MWD(18-11BPB1) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 6,036.00 14,397.47 OnTrak MWD(18-11BPB2) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 7/24/2014 12:33:17PM Page 2 COMPASS 5000.1 Build 61 E I- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11B©64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11BPB2 Survey Calculation Method: Minimum Curvature Design: 18-11 BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 2,654.05 2.10 234.30 2,653.97 -2.09 -6.69 5,960,599.43 692,192.73 70°17'48.730 N 148°26'36.77 W 18-11B PB1 TIP 2,666.00 2.14 202.62 2,665.92 -2.42 -6.96 5,960,599.09 692,192.48 70°17'48.726 N 148°26'36.78 W 2,696.00 2.47 189.25 2,695.89 -3.58 -7.28 5,960,597.93 692,192.19 70°17 48.715 N 148°26'36.79 W 2,726.00 2.01 223.00 2,725.87 -4.60 -7.74 5,960,596.89 692,191.75 70°17 48.705 N 148°26'36.80 W 2,761.00 3.40 263.77 2,760.83 -5.16 -9.19 5,960,596.30 692,190.31 70°17'48.700 N 148°26'36.84 W 2,791.00 4.54 281.32 2,790.76 -5.02 -11.24 5,960,596.38 692,188.26 70°17 48.701 N 148°26'36.90 W 2,821.00 5.44 290.61 2,820.65 -4.29 -13.74 5,960,597.05 692,185.75 70°17'48.708 N 148°26'36.97 W 2,857.00 6.31 300.16 2,856.46 -2.70 -17.04 5,960,598.56 692,182.40 70°17'48.724 N 148°26'37.07 W 2,887.00 7.29 309.76 2,886.25 -0.65 -19.93 5,960,600.53 692,179.46 70°17'48.744 N 148°26'37.16 W 2,917.00 8.87 316.53 2,915.95 2.25 -22.99 5,960,603.35 692,176.33 70°17'48.772 N 148°26'37.24 W 2,951.00 10.52 319.93 2,949.46 6.52 -26.79 5,960,607.53 692,172.43 70°17'48.814 N 148°26'37.36 W 2,981.00 11.72 324.77 2,978.90 11.11 -30.31 5,960,612.02 692,168.79 70°17'48.860 N 148°26'37.46 W 3,011.00 13.03 327.87 3,008.20 16.46 -33.87 5,960,617.28 692,165.10 70°17'48.912 N 148°26'37.56 W 3,047.00 14.06 327.89 3,043.20 23.60 -38.35 5,960,624.30 692,160.43 70°17'48.982 N 148°26'37.69 W 3,077.00 14.58 329.06 3,072.27 29.93 -42.23 5,960,630.53 692,156.39 70°17'49.045 N 148°26'37.81 W 3,107.00 15.43 329.58 3,101.25 36.61 -46.19 5,960,637.10 692,152.26 70°17'49.110 N 148°26'37.92 W 3,143.86 17.10 330.28 3,136.63 45.54 51.36 5,960,645.90 692,146.87 70°17'49.198 N 148°26'38.07 W 3,178.92 18.45 331.09 3,170.02 54.88 -56.60 5,960,655.10 692,141.39 70°17'49.290 N 148°26'38.22 W 3,208.91 19.80 331.56 3,198.35 63.50 -61.31 5,960,663.60 692,136.46 70°17'49.375 N 148°26'38.36 W 3,237.87 20.98 332.80 3,225.49 72.42 -66.02 5,960,672.40 692,131.53 70°17'49.463 N 148°26'38.50 W 3,272.39 21.17 333.32 3,257.71 83.49 -71.64 5,960,683.31 692,125.62 70°17'49.571 N 148°26'38.66 W 3,303.73 21.92 333.44 3,286.86 93.78 -76.80 5,960,693.47 692,120.21 70°17'49.673 N 148°26'38.81 W 3,332.82 22.52 333.70 3,313.79 103.63 -81.69 5,960,703.19 692,115.06 70°17'49.769 N 148°26'38.96 W 3,367.51 23.81 333.16 3,345.68 115.83 -87.80 5,960,715.23 692,108.64 70°17'49.890 N 148°26'39.13 W 3,399.58 25.28 332.72 3,374.85 127.70 -93.86 5,960,726.94 692,102.28 70°17'50.006 N 148°26'39.31 W 3,427.85 26.92 332.02 3,400.24 138.71 -99.63 5,960,737.80 692,096.23 70°17'50.115 N 148°26'39.48 W 3,462.63 26.96 331.74 3,431.24 152.61 -107.06 5,960,751.50 692,088.45 70°17'50.251 N 148°26'39.69 W 3,494.77 27.80 331.65 3,459.78 165.62 -114.06 5,960,764.33 692,081.11 70°17'50.379 N 148°26'39.90 W 3,522.78 28.57 331.40 3,484.47 177.25 -120.37 5,960,775.80 692,074.51 70°17'50.494 N 148°26'40.08 W 3,557.67 29.45 332.07 3,514.98 192.16 -128.38 5,960,790.49 692,066.12 70°17'50.640 N 148°26'40.32 W 3,588.86 30.45 332.79 3,542.01 205.96 -135.59 5,960,804.10 692,058.57 70°17'50.776 N 148°26'40.53 W 3,617.27 31.23 333.16 3,566.40 218.93 -142.21 5,960,816.90 692,051.62 70°17'50.903 N 148°26'40.72 W 3,651.25 32.43 333.54 3,595.27 234.95 -150.24 5,960,832.71 692,043.18 70°17'51.061 N 148°26'40.95 W 3,682.45 33.87 332.91 3,621.39 250.18 -157.93 5,960,847.74 692,035.10 70°17'51.211 N 148°26'41.18 W 3,712.35 34.86 333.14 3,646.07 265.22 -165.59 5,960,862.58 692,027.07 70°17'51.359 N 148°26'41.40 W 3,745.28 36.14 332.83 3,672.88 282.26 -174.27 5,960,879.38 692,017.95 70°17'51.526 N 148°26'41.65 W 3,777.03 37.40 332.46 3,698.31 299.14 -183.01 5,960,896.03 692,008.79 70°17'51.692 N 148°26'41.91 W 3,806.24 38.08 332.72 3,721.41 315.01 -191.24 5,960,911.69 692,000.15 70°17'51.848 N 148°26'42.15 W 3,840.71 38.94 332.90 3,748.38 334.10 -201.04 5,960,930.52 691,989.86 70°17'52.036 N 148°26'42.43 W 3,871.85 39.98 332.93 3,772.43 351.72 -210.05 5,960,947.90 691,980.40 70°17'52.209 N 148°26'42.70 W 3,902.83 41.07 333.28 3,795.97 369.67 -219.16 5,960,965.62 691,970.84 70°17'52.386 N 148°26'42.96 W 3,935.74 42.41 333.68 3,820.53 389.28 -228.94 5,960,984.96 691,960.56 70°17'52.579 N 148°26'43.25 W 3,966.35 43.52 334.30 3,842.93 408.03 -238.09 5,961,003.47 691,950.94 70°17 52.763 N 148°26'43.51 W 3,996.78 44.35 334.93 3,864.84 427.10 -247.14 5,961,022.31 691,941.41 70°17'52.951 N 148°26'43.78 W 4,093.33 47.87 335.28 3,931.77 490.21 -276.42 5,961,084.64 691,910.52 70°17'53.571 N 148°26'44.63 WI 4,139.84 49.21 335.21 3,962.56 521.86 -291.01 5,961,115.91 691,895.12 70°17'53.883 N 148°26'45.06 W 4,173.77 49.85 335.53 3,984.58 545.32 -301.77 5,961,139.09 691,883.77 70°17'54.113 N 148°26'45.37 W 4,199.79 50.31 334.93 4,001.28 563.44 -310.13 5,961,156.99 691,874.95 70°17'54.292 N 148°26'45.61 W 4,232.39 50.92 334.99 4,021.97 586.27 -320.80 5,961,179.53 691,863.71 70°17'54.516 N 148°26'45.93 W 4,268.90 52.02 334.61 4,044.71 612.11 -332.96 5,961,205.05 691,850.89 70°17'54.770 N 148°26'46.28 W 4,295.48 53.28 334.94 4,060.83 631.23 -341.96 5,961,223.93 691,841.40 70°17'54.958 N 148°26'46.54 W 4,331.33 54.95 334.75 4,081.85 657.52 -354.31 5,961,249.89 691,828.38 70°17'55.217 N 148°26'46.90 W 4,360.81 55.94 335.36 4,098.57 679.53 -364.55 5,961,271.64 691,817.59 70°17'55.433 N 148°26'47.20 W 4,390.35 56.88 335.05 4,114.91 701.87 -374.87 5,961,293.70 691,806.70 70°17'55.653 N 148°26'47.50 W 7/24/2014 12:33:17PM Page 3 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11BPB2 Survey Calculation Method: Minimum Curvature Design: 18-11 BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 4,423.75 57.86 335.60 4,132.92 727.43 -386.61 5,961,318.95 691,794.31 70°17'55.904 N 148°26'47.84 W 4,457.74 58.84 335.09 4,150.76 753.73 -398.68 5,961,344.93 691,781.57 70°17'56.163 N 148°26'48.20 W 4,484.59 59.49 335.16 4,164.52 774.64 -408.38 5,961,365.59 691,771.34 70°17 56.369 N 148°26'48.48 W 4,579.83 61.61 335.12 4,211.34 849.89 -443.24 5,961,439.91 691,734.57 70°17 57.109 N 148°26'49.50 W 4,674.66 61.67 336.26 4,256.39 925.93 -477.59 5,961,515.05 691,698.28 70°17 57.857 N 148°26'50.50 W 4,769.87 61.60 336.14 4,301.62 1,002.59 -511.40 5,961,590.81 691,662.53 70°17'58.611 N 148°26'51.48 W 4,865.59 61.57 336.51 4,347.17 1,079.69 -545.21 5,961,667.02 691,626.76 70°17'59.369 N 148°26'52.47 W 4,961.12 61.54 337.21 4,392.67 1,156.93 -578.22 5,961,743.39 691,591.79 70°18'0.128 N 148°26'53.43 W 5,056.13 61.53 337.19 4,437.96 1,233.93 -610.58 5,961,819.53 691,557.47 70°18'0.886 N 148°26'54.37 W 5,150.34 61.63 336.84 4,482.79 1,310.21 -642.94 5,961,894.95 691,523.18 70°18'1.636 N 148°26'55.32 W 5,245.82 60.98 337.09 4,528.64 1,387.28 -675.71 5,961,971.16 691,488.44 70°18'2.394 N 148°26'56.27 W 5,340.41 60.67 336.74 4,574.75 1,463.26 -708.09 5,962,046.28 691,454.13 70°18'3.141 N 148°26'57.22 W 5,435.83 60.09 337.66 4,621.91 1,539.72 -740.24 5,962,121.89 691,420.04 70°18'3.893 N 148°26'58.16 W 5,530.66 60.18 337.17 4,669.13 1,615.65 -771.82 5,962,196.98 691,386.53 70°18'4.640 N 148°26'59.08 W 5,625.36 59.97 336.43 4,716.38 1,691.09 -804.15 5,962,271.56 691,352.28 70°18'5.382 N 148°27'0.02 W 5,720.68 59.92 334.95 4,764.12 1,766.28 -838.12 5,962,345.85 691,316.41 70°18'6.121 N 148°27'1.01 W 5,815.15 59.95 332.83 4,811.45 1,839.69 -874.10 5,962,418.31 691,278.57 70°18'6.843 N 148°27'2.06 W 5,910.21 59.89 330.40 4,859.10 1,912.05 -913.20 5,962,489.65 691,237.63 70°18'7.555 N 148°27'3.20 W 6,004.76 59.91 328.44 4,906.52 1,982.46 -954.81 5,962,558.97 691,194.23 70°18'8.247 N 148°27'4.41 W 18-11B PB2 TIP 6,036.00 60.03 327.98 4,922.15 2,005.45 -969.06 5,962,581.59 691,179.40 70°18'8.473 N 148°27'4.83 W 18-11B PB2 TOW 6,099.13 59.37 329.74 4,954.01 2,052.10 -997.24 5,962,627.50 691,150.03 70°18'8.932 N 148°27'5.65 W 6,193.64 59.24 326.55 5,002.26 2,121.12 -1,040.13 5,962,695.39 691,105.40 70°18'9.611 N 148°27'6.90 W 6,289.53 59.24 323.08 5,051.31 2,188.45 -1,087.59 5,962,761.48 691,056.23 70°18'10.273 N 148°27'8.29 W 6,383.80 59.31 319.82 5,099.49 2,251.81 -1,138.09 5,962,823.53 691,004.14 70°18'10.896 N 148°27'9.76 W 6,478.40 59.05 318.24 5,147.96 2,313.15 -1,191.35 5,962,883.48 690,949.33 70°18'11.499 N 148°27'11.31 W 6,573.37 59.06 317.84 5,196.79 2,373.72 -1,245.81 5,962,942.63 690,893.34 70°18'12.095 N 148°27'12.90 W 6,668.39 59.01 318.43 5,245.68 2,434.39 -1,300.19 5,963,001.90 690,837.43 70°18'12.691 N 148°27'14.49 W 6,763.91 59.05 319.73 5,294.84 2,496.28 -1,353.83 5,963,062.39 690,782.23 70°18'13.300 N 148°27'16.05 W 6,857.57 59.05 321.11 5,343.01 2,558.19 -1,405.01 5,963,122.96 690,729.48 70°18'13.909 N 148°27'17.54 W 6,952.57 59.08 322.71 5,391.85 2,622.32 -1,455.27 5,963,185.78 690,677.60 70°18'14.539 N 148°27'19.01 W 7,047.72 59.51 324.88 5,440.43 2,688.33 -1,503.59 5,963,250.53 690,627.61 70°18'15.188 N 148°27'20.42 W 7,142.15 60.13 330.18 5,487.93 2,757.16 -1,547.38 5,963,318.22 690,582.08 70°18'15.865 N 148°27'21.69 W 7,237.78 60.10 332.30 5,535.58 2,829.84 -1,587.27 5,963,389.85 690,540.35 70°18'16.580 N 148°27'22.86 W 7,332.51 60.05 332.68 5,582.84 2,902.66 -1,625.19 5,963,461.67 690,500.58 70°18'17.296 N 148°27'23.96 W 7,427.19 60.06 333.04 5,630.10 2,975.67 -1,662.62 5,963,533.69 690,461.30 70°18'18.014 N 148°27'25.06 W 7,522.09 60.16 333.30 5,677.40 3,049.09 -1,699.75 5,963,606.14 690,422.30 70°18'18.736 N 148°27'26.14 W 7,616.81 60.08 333.22 5,724.58 3,122.43 -1,736.70 5,963,678.51 690,383.49 70°18'19.457 N 148°27'27.22 W 7,711.08 60.33 333.28 5,771.43 3,195.49 -1,773.53 5,963,750.59 690,344.81 70°18'20.176 N 148°27'28.29 W 7,805.90 60.16 333.72 5,818.48 3,269.16 -1,810.26 5,963,823.29 690,306.21 70°18'20.900 N 148°27'29.36 W 7,899.80 60.12 333.67 5,865.24 3,342.16 -1,846.34 5,963,895.34 690,268.27 70°18'21.618 N 148°27'30.42 W 7,995.19 60.19 333.65 5,912.71 3,416.31 -1,883.06 5,963,968.53 690,229.68 70°18'22.347 N 148°27'31.49 W 8,089.96 60.13 333.96 5,959.86 3,490.07 -1,919.34 5,964,041.33 690,191.52 70°18'23.073 N 148°27'32.55 W 8,184.12 61.31 334.69 6,005.91 3,564.09 -1,954.92 5,964,114.41 690,154.06 70°18'23.800 N 148°27'33.58 W 8,279.76 61.96 335.80 6,051.35 3,640.51 -1,990.16 5,964,189.91 690,116.88 70°18'24.552 N 148°27'34.61 W 8,374.33 61.88 337.43 6,095.87 3,717.09 -2,023.28 5,964,265.61 690,081.82 70°18'25.305 N 148°27'35.58 W 8,469.25 62.68 338.00 6,140.02 3,794.84 -2,055.14 5,964,342.52 690,047.98 70°18'26.070 N 148°27'36.51 W 8,563.91 63.99 338.30 6,182.50 3,873.36 -2,086.62 5,964,420.19 690,014.50 70°18'26.842 N 148°27'37.43 W 8,658.51 65.52 337.19 6,222.85 3,952.54 -2,119.03 5,964,498.52 689,980.08 70°18'27.620 N 148°27'38.37 W 8,754.39 66.69 336.07 6,261.68 4,033.01 -2,153.80 5,964,578.07 689,943.26 70°18'28.412 N 148°27'39.39 W 8,848.60 67.80 334.69 6,298.13 4,111.98 -2,190.00 5,964,656.08 689,905.06 70°18'29.188 N 148°27'40.44 W 8,943.23 68.91 334.61 6,333.03 4,191.47 -2,227.66 5,964,734.58 689,865.38 70°18'29.970 N 148°27'41.54 W 9,038.01 70.06 334.71 6,366.24 4,271.69 -2,265.65 5,964,813.80 689,825.36 70°18'30.759 N 148°27'42.65 W 9,132.94 71.24 336.06 6,397.70 4,353.12 -2,302.95 5,964,894.24 689,785.99 70°18'31.560 N 148°27'43.74 W 7/24/2014 12:33:17PM Page 4 COMPASS 50001 Build 61 S..e IrVA opSurvey Report-Geographic BAKER 5'`®"•* HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 BPB2 Survey Calculation Method: Minimum Curvature Design: 18-11BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map 1 ! Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,227.91 72.18 338.24 6,427.51 4,436.21 -2,337.96 5,964,976.40 689,748.87 70°18'32.377 N 148°27'44.76 W 9,323.74 73.49 338.72 6,455.79 4,521.39 -2,371.54 5,965,060.69 689,713.12 70°18'33.214 N 148°27'45.74 W 9,418.70 74.13 339.00 6,482.26 4,606.44 -2,404.43 5,965,144.87 689,678.07 70°18'34.051 N 148°27'46.70 W 9,512.90 74.07 339.01 6,508.07 4,691.03 -2,436.89 5,965,228.59 689,643.46 70°18'34.882 N 148°27'47.65 W 9,607.92 74.13 339.18 6,534.10 4,776.40 -2,469.50 5,965,313.09 689,608.68 70°18'35.722 N 148°27'48.60 W 9,701.98 74.16 338.59 6,559.80 4,860.80 -2,502.09 5,965,396.63 689,573.94 70°18'36.552 N 148°27'49.55 W 9,797.22 74.13 338.60 6,585.82 4,946.10 -2,535.53 5,965,481.04 689,538.33 70°18'37.391 N 148°27'50.53 W 9,892.56 74.13 338.59 6,611.89 5,031.48 -2,569.00 5,965,565.54 689,502.69 70°18'38.230 N 148°27'51.51 W 9,986.74 74.16 339.18 6,637.62 5,115.99 -2,601.64 5,965,649.18 689,467.91 70°18'39.061 N 148°27'52.46 W 10,081.37 74.13 339.68 6,663.48 5,201.22 -2,633.62 5,965,733.56 689,433.76 70°18'39.899 N 148°27'53.39 W 10,176.20 74.10 339.60 6,689.43 5,286.73 -2,665.35 5,965,818.22 689,399.85 70°18'40.740 N 148°27'54.32 W 10,271.21 74.14 339.49 6,715.43 5,372.35 -2,697.29 5,965,903.00 689,365.74 70°18'41.582 N 148°27'55.25 W 10,365.73 74.17 338.94 6,741.24 5,457.36 -2,729.56 5,965,987.15 689,331.31 70°18'42.418 N 148°27'56.19 W 10,461.50 74.16 338.91 6,767.37 5,543.33 -2,762.69 5,966,072.24 689,295.99 70°16'43.264 N 148°27'57.16 W 10,556.13 74.13 339.16 6,793.22 5,628.34 -2,795.26 5,966,156.38 689,261.26 70°18'44.100 N 148°27'58.11 W 10,651.34 74.10 338.50 6,819.28 5,713.73 -2,828.33 5,966,240.89 689,226.02 70°18'44.939 N 148°27'59.08 W 10,746.21 73.91 338.05 6,845.42 5,798.45 -2,862.08 5,966,324.72 689,190.11 70°18'45.772 N 148°28'0.06 W' 10,841.08 73.88 337.68 6,871.74 5,882.88 -2,896.43 5,966,408.24 689,153.62 70°18'46.603 N 148°28'1.07 W 10,935.95 73.94 337.17 6,898.03 5,967.05 -2,931.42 5,966,491.48 689,116.49 70°18'47.430 N 148°28'2.09 W 11,031.10 74.00 337.13 6,924.31 6,051.32 -2,966.93 5,966,574.81 689,078.83 70°18'48.259 N 148°28'3.13 W 11,125.84 73.98 337.63 6,950.44 6,135.38 -3,001.96 5,966,657.94 689,041.67 70°18'49.086 N 148°28'4.15 W 11,221.03 73.94 338.05 6,976.74 6,220.11 -3,036.46 5,966,741.75 689,005.01 70°18'49.919 N 148°28'5.16 W 11,315.91 73.88 338.36 7,003.04 6,304.76 -3,070.31 5,966,825.50 688,969.01 70°18'50.751 N 148°28'6.14 W 11,410.83 73.90 338.82 7,029.38 6,389.66 -3,103.60 5,966,909.52 688,933.56 70°18'51.586 N 148°28'7.12 W 11,506.01 73.91 339.13 7,055.76 6,475.02 -3,136.41 5,966,994.01 688,898.58 70°18'52.425 N 148°28'8.07 W 11,599.00 73.91 339.53 7,081.53 6,558.61 -3,167.95 5,967,076.76 688,864.92 70°18'53.247 N 148°28'9.00 W 11,695.88 73.94 339.92 7,108.36 6,645.94 -3,200.21 5,967,163.23 688,830.44 70°18'54.106 N 148°28'9.94 W 11,789.11 71.50 340.22 7,136.05 6,729.62 -3,230.55 5,967,246.10 688,797.97 70°18'54.929 N 148°28'10.82 W 11,885.09 68.42 339.88 7,168.94 6,814.37 -3,261.31 5,967,330.03 688,765.05 70°18'55.762 N 148°28'11.72 W 11,979.38 65.65 340.17 7,205.72 6,895.95 -3,290.97 5,967,410.83 688,733.32 70°18'56.565 N 148°28'12.59 W 12,074.69 63.09 340.34 7,246.95 6,976.83 -3,320.00 5,967,490.93 688,702.24 70°18'57.360 N 148°28'13.44 W 12,169.59 59.91 340.30 7,292.22 7,055.34 -3,348.08 5,967,568.70 688,672.16 70°18'58.132 N 148°28'14.26 W 12,264.81 56.33 339.69 7,342.50 7,131.31 -3,375.73 5,967,643.93 688,642.58 70°18'58.879 N 148°28'15.07 W 12,359.53 53.98 339.29 7,396.62 7,204.12 -3,402.96 5,967,716.01 688,613.49 70°18'59.595 N 148°28'15.86 W 12,454.36 53.17 338.68 7,452.93 7,275.34 -3,430.32 5,967,786.51 688,584.32 70°19'0.295 N 148°28'16.66 W 12,549.29 51.34 338.30 7,511.04 7,345.18 -3,457.84 5,967,855.62 688,555.03 70°19'0.982 N 148°28'17.46 W 12,644.17 47.29 338.05 7,572.88 7,411.96 -3,484.58 5,967,921.68 688,526.59 70°19'1.639 N 148°28'18.24 W 12,739.40 44.28 337.75 7,639.28 7,475.19 -3,510.25 5,967,984.24 688,499.31 70°19'2.260 N 148°28'18.99 W 12,833.51 42.77 337.92 7,707.51 7,535.21 -3,534.70 5,968,043.61 688,473.33 70°19'2.851 N 148°28'19.71 W 12,928.26 39.20 338.12 7,779.03 7,592.83 -3,557.96 5,968,100.61 688,448.61 70°19'3.417 N 148°28'20.39 W 13,022.63 35.18 338.09 7,854.19 7,645.74 -3,579.23 5,968,152.96 688,426.00 70°19'3.937 N 148°28'21.01 W 13,117.49 35.20 338.66 7,931.71 7,696.56 -3,599.37 5,968,203.24 688,404.56 70°19'4.437 N 148°28'21.60 W 13,212.12 34.95 338.65 8,009.16 7,747.21 -3,619.17 5,968,253.37 688,383.48 70°19'4.935 N 148°28'22.18 W 13,306.67 34.52 338.87 8,086.86 7,797.42 -3,638.68 5,968,303.06 688,362.69 70°19'5.429 N 148°28'22.75 W 13,399.65 34.79 339.46 8,163.34 7,846.84 -3,657.49 5,968,351.98 688,342.63 70°19'5.915 N 148°28'23.30 W 13,414.60 35.17 339.03 8,175.59 7,854.85 -3,660.53 5,968,359.91 688,339.39 70°19'5.994 N 148°28'23.38 W 13,478.38 36.00 337.73 8,227.46 7,889.35 -3,674.20 5,968,394.05 688,324.83 70°19'6.333 N 148°28'23.78 W 13,510.88 38.99 335.14 8,253.25 7,907.47 -3,682.12 5,968,411.96 688,316.45 70°19'6.511 N 148°28'24.02 W 13,542.57 41.50 332.60 8,277.43 7,925.84 -3,691.15 5,968,430.09 688,306.96 70°19'6.692 N 148°28'24.28 W 13,574.76 44.33 333.25 8,301.01 7,945.36 -3,701.12 5,968,449.34 688,296.49 70°19'6.884 N 148°28'24.57 W 13,605.79 47.20 333.61 8,322.65 7,965.24 -3,711.06 5,968,468.97 688,286.04 70°19'7.079 N 148°28'24.86 W 13,637.52 50.03 331.84 8,343.63 7,986.40 -3,721.98 5,968,489.83 688,274.59 70°19'7.287 N 148°28'25.18 W 13,669.11 52.97 330.30 8,363.29 8,008.03 -3,733.94 5,968,511.15 688,262.08 70°19'7.500 N 148°28'25.53 W 13,701.08 56.28 328.07 8,381.80 8,030.40 -3,747.30 5,968,533.17 688,248.15 70°19'7.720 N 148°28'25.92 W 13,733.78 59.50 329.12 8,399.18 8,054.04 -3,761.73 5,968,556.43 688,233.13 70°19'7.952 N 148°28'26.34 W 7/24/2014 12:33:17PM Page 5 COMPASS 5000.1 Build 61 Fa-- . 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 BPB2 Survey Calculation Method: Minimum Curvature Design: 18-11 BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 13,763.95 61.05 329.89 8,414.14 8,076.62 -3,775.02 5,968,578.66 688,219.26 70°19'8.174 N 148°28'26.73 W 13,828.20 60.87 329.91 8,445.33 8,125.22 -3,803.19 5,968,626.52 688,189.86 70°19'8.652 N 148°28'27.55 W 13,859.70 61.01 330.60 8,460.63 8,149.12 -3,816.85 5,968,650.07 688,175.59 70°19'8.887 N 148°28'27.95 W 13,953.34 61.54 329.84 8,505.63 8,220.39 -3,857.64 5,968,720.27 688,133.00 70°19'9.588 N 148°28'29.14 W 14,047.31 61.82 331.15 8,550.21 8,292.39 -3,898.38 5,968,791.19 688,090.44 70°19'10.296 N 148°28'30.33 W 14,143.43 61.47 330.86 8,595.86 8,366.37 -3,939.38 5,968,864.10 688,047.56 70°19'11.023 N 148°28'31.53 W 14,237.60 61.72 330.33 8,640.66 8,438.53 -3,980.05 5,968,935.19 688,005.06 70°19'11.732 N 148°28'32.72 W 14,333.15 62.16 331.24 8,685.61 8,512.12 -4,021.20 5,969,007.70 687,962.04 70°19'12.456 N 148°28'33.92 W 14,397.47 62.29 331.50 8,715.58 8,562.08 -4,048.47 5,969,056.94 687,933.51 70°19'12.947 N 148°28'34.72 W 14,466.00 62.29 331.50 8,747.44 8,615.39 -4,077.42 5,969,109.50 687,903.20 70°19'13.471 N 148°28'35.56 W Projection to TD Targets Target Name • -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting -Shape (°) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude T-Pilotwp08 0.00 0.00 8,704.50 8,504.73 -4,033.44 5,969,000.00 687,950.00 70°19'12.383 N 148°28'34.28 W -actual wellpath misses target center by 22.19usft at 14341.40usft MD(8689.46 TVD,8518.52 N,-4024.71 E) -Point T8.00 0.00 0.00 8,177.50 7,849.93 -3,660.04 5,968,355.00 688,340.00 70°19'5.945 N 148°28'23.37 W -actual wellpath misses target center by 5.17usft at 13413.42usft MD(8174.63 TVD,7854.22 N,-3660.28 E) -Circle(radius 30.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 13,446.00 8,201.20 INTERMEDIATE CASING 1 7.000 8.500 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-5 +E/-W (usft) (usft) (usft) (usft) Comment 2,654.05 2,653.97 -2.09 -6.69 18-11B PB1 TIP 6,004.76 4,906.52 1,982.46 -954.81 18-11B PB2 TIP 6,036.00 4,922.15 2,005.45 -969.06 18-11B PB2 TOW 14,466.00 8,747.44 8,615.39 -4,077.42 Projection to TD Checked By: Approved By: Date: 7/24/2014 12:33.17PM Page 6 COMPASS 5000.1 Build 61 by North America - ALASKA - BP Prudhoe Bay PB DS 18 18-11 500292118100 18-11 BPB3 Design: 18-11 BPB3 Survey Report - Geographic 24 July, 2014 BAKER HUGHES EP- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 BPB3 Survey Calculation Method: Minimum Curvature Design: 18-11 BPB3 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15 usft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44 usft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.46 ° Well 18-11 API No. 500292118100 Well Position +N/-S 0.00 usft Northing: 5,960,601.69 usft Latitude: 70°17'48.750 N +E/-W 0.00 usft Easting: 692,199.37 usft Longitude: 148°26'36.57 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 17.40 usft Wellbore 18-11BPB3 API no. 500292118172 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2013 5/5/2014 19.92 81.02 57,635 Design 18-11BPB3 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 2,654.05 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 48.50 0.00 0.00 329.73 Survey Program Date: 7/24/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 57.50 2,654.05 Survey#1 GCT Gyro MS(18-11 DPN) GCT-MS Schlumberger GCT multishot 2,666.00 3,107.00 Gyro MS(18-11 BPB1) GYD-CT-CMS Gyrodata cont.casing m/s 3,143.86 6,004.76 MWD(18-11 BPB1) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 6,036.00 13,859.70 OnTrak MWD(18-11BPB2) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 13,888.00 15,567.65 OnTraK MWD(18-11BPB3) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 7/24/2014 1:58.50PM Page 2 COMPASS 5000.1 Build 61 Ivo IPS bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B©64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11BPB3 Survey Calculation Method: Minimum Curvature Design: 18-11BPB3 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 2,654.05 2.10 234.30 2,653.97 -2.09 -6.69 5,960,599.43 692,192.73 70°17 48.730 N 148°26'36.77 W 18-11B PB1 TIP 2,666.00 2.14 202.62 2,665.92 -2.42 -6.96 5,960,599.09 692,192.48 70°17'48.726 N 148°26'36.78 W ' 2,696.00 2.47 189.25 2,695.89 -3.58 -7.28 5,960,597.93 692,192.19 70°17'48.715 N 148°26'36.79 W 2,726.00 2.01 223.00 2,725.87 -4.60 -7.74 5,960,596.89 692,191.75 70°17'48.705 N 148°26'36.80 W 2,761.00 3.40 263.77 2,760.83 -5.16 -9.19 5,960,596.30 692,190.31 70°17'48.700 N 148°26'36.84 W 2,791.00 4.54 281.32 2,780.76 -5.02 -11.24 5,960,596.38 692,188.26 70°17'48.701 N 148°26'36.90 W 2,821.00 5.44 290.61 2,820.65 -4.29 -13.74 5,960,597.05 692,185.75 70°17'48.708 N 148°26'36.97 W 2,857.00 6.31 300.16 2,856.46 -2.70 -17.04 5,960,598.56 692,182.40 70°17'48.724 N 148°26'37.07 W 1 2,887.00 7.29 309.76 2,886.25 -0.65 -19.93 5,960,600.53 692,179.46 70°17'48.744 N 148°26'37.16 W 2,917.00 8.87 316.53 2,915.95 2.25 -22.99 5,960,603.35 692,176.33 70°17'48.772 N 148°26'37.24 W 2,951.00 10.52 319.93 2,949.46 6.52 -26.79 5,960,607.53 692,172.43 70°17'48.814 N 148°26'37.36 W 2,981.00 11.72 324.77 2,978.90 11.11 -30.31 5,960,612.02 692,168.79 70°17'48.860 N 148°26'37.46 W 3,011.00 13.03 327.87 3,008.20 16.46 -33.87 5,960,617.28 692,165.10 70°17'48.912 N 148°26'37.56 W 3,047.00 14.06 327.89 3,043.20 23.60 -38.35 5,960,624.30 692,160.43 70°17'48.982 N 148°26'37.69 W 3,077.00 14.58 329.06 3,072.27 29.93 -42.23 5,960,630.53 692,156.39 70°17'49.045 N 148°26'37.81 W 3,107.00 15.43 329.58 3,101.25 36.61 -46.19 5,960,637.10 692,152.26 70°17'49.110 N 148°26'37.92 W 3,143.86 17.10 330.28 3,136.63 45.54 -51.36 5,960,645.90 692,146.87 70°17'49.198 N 148°26'38.07 W 3,178.92 18.45 331.09 3,170.02 54.88 -56.60 5,960,655.10 692,141.39 70°17'49.290 N 148°26'38.22 W 3,208.91 19.80 331.56 3,198.35 63.50 -61.31 5,960,663.60 692,136.46 70°17'49.375 N 148°26'38.36 W 3,237.87 20.98 332.80 3,225.49 72.42 -66.02 5,960,672.40 692,131.53 70°17'49.463 N 148°26'38.50 W 3,272.39 21.17 333.32 3,257.71 83.49 -71.64 5,960,683.31 692,125.62 70°17'49.571 N 148°26'38.66 W 3,303.73 21.92 333.44 3,286.86 93.78 -76.80 5,960,693.47 692,120.21 70°17'49.673 N 148°26'38.81 W 3,332.82 22.52 333.70 3,313.79 103.63 -81.69 5,960,703.19 692,115.06 70°17'49.769 N 148°26'38.96 W 3,367.51 23.81 333.16 3,345.68 115.83 -87.80 5,960,715.23 692,108.64 70°17'49.890 N 148°26'39.13 W 3,399.58 25.28 332.72 3,374.85 127.70 -93.86 5,960,726.94 692,102.28 70°17'50.006 N 148°26'39.31 W 3,427.85 26.92 332.02 3,400.24 138.71 -99.63 5,960,737.80 692,096.23 70°17'50.115 N 148°26'39.48 W 3,462.63 26.96 331.74 3,431.24 152.61 -107.06 5,960,751.50 692,088.45 70°17'50.251 N 148°26'39.69 W 3,494.77 27.80 331.65 3,459.78 165.62 -114.06 5,960,764.33 692,081.11 70°17'50.379 N 148°26'39.90 W 3,522.78 28.57 331.40 3,484.47 177.25 -120.37 5,960,775.80 692,074.51 70°17'50.494 N 148°26'40.08 W 3,557.67 29.45 332.07 3,514.98 192.16 -128.38 5,960,790.49 692,066.12 70°17'50.640 N 148°26'40.32 W 3,588.86 30.45 332.79 3,542.01 205.96 -135.59 5,960,804.10 692,058.57 70°17'50.776 N 148°26'40.53 W 1 3,617.27 31.23 333.16 3,566.40 218.93 -142.21 5,960,816.90 692,051.62 70°17'50.903 N 148°26'40.72 W 3,651.25 32.43 333.54 3,595.27 234.95 -150.24 5,960,832.71 692,043.18 70°17'51.061 N 148°26'40.95 W 3,682.45 33.87 332.91 3,621.39 250.18 -157.93 5,960,847.74 692,035.10 70°17'51.211 N 148°26'41.16 W 3,712.35 34.86 333.14 3,846.07 265.22 -165.59 5,960,862.58 692,027.07 70°17'51.359 N 148°26'41.40 W 3,745.28 36.14 332.83 3,672.88 282.26 -174.27 5,960,879.38 692,017.95 70°17'51.526 N 148°26'41.65 W 3,777.03 37.40 332.46 3,698.31 299.14 -183.01 5,960,896.03 692,008.79 70°17'51.692 N 148°26'41.91 W 3,806.24 38.08 332.72 3,721.41 315.01 -191.24 5,960,911.69 692,000.15 70°17'51.848 N 148°26'42.15 W 3,840.71 38.94 332.90 3,748.38 334.10 -201.04 5,960,930.52 691,989.86 70°17'52.036 N 148°26'42.43 W 3,871.85 39.98 332.93 3,772.43 351.72 -210.05 5,960,947.90 691,980.40 70°17'52.209 N 148°26'42.70 W 3,902.83 41.07 333.28 3,795.97 369.67 -219.16 5,960,965.62 691,970.84 70°17'52.386 N 148°26'42.96 W 3,935.74 42.41 333.68 3,820.53 389.28 -228.94 5,960,984.96 691,960.56 70°17'52.579 N 148°26'43.25 W 3,966.35 43.52 334.30 3,842.93 408.03 -238.09 5,961,003.47 691,950.94 70°17'52.763 N 148°26'43.51 W 3,996.78 44.35 334.93 3,864.84 427.10 -247.14 5,961,022.31 691,941.41 70°17'52.951 N 148°26'43.78 W 4,093.33 47.87 335.28 3,931.77 490.21 -276.42 5,961,084.64 691,910.52 70°17'53.571 N 148°26'44.63 W 4,139.84 49.21 335.21 3,962.56 521.86 -291.01 5,961,115.91 691,895.12 70°17'53.883 N 148°26'45.06 W 4,173.77 49.85 335.53 3,984.58 545.32 -301.77 5,961,139.09 691,883.77 70°17'54.113 N 148°26'45.37 W 4,199.79 50.31 334.93 4,001.28 563.44 -310.13 5,961,156.99 691,874.95 70°17'54.292 N 148°26'45.61 W 4,232.39 50.92 334.99 4,021.97 586.27 -320.80 5,961,179.53 691,863.71 70°17 54.516 N 148°26'45.93 W 4,268.90 52.02 334.61 4,044.71 612.11 -332.96 5,961,205.05 691,850.89 70°17 54.770 N 148°26'46.28 W 4,295.48 53.28 334.94 4,060.83 631.23 -341.96 5,961,223.93 691,841.40 70°17 54.958 N 148°26'46.54 W 4,331.33 54.95 334.75 4,081.85 657.52 -354.31 5,961,249.89 691,828.38 70°17 55.217 N 148°26'46.90 W 4,360.81 55.94 335.36 4,098.57 679.53 -364.55 5,961,271.64 691,817.59 70°17'55.433 N 148°26'47.20 W 4,390.35 56.88 335.05 4,114.91 701.87 -374.87 5,961,293.70 691,806.70 70°17 55.653 N 148°26'47.50 W 7/24/2014 1:58:50PM Page 3 COMPASS 5000.1 Build 61 Fr-- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B©64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11B©64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 BPB3 Survey Calculation Method: Minimum Curvature Design: 18-11BPB3 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 4,423.75 57.86 335.60 4,132.92 727.43 -386.61 5,961,318.95 691,794.31 70°17'55.904 N 148°26'47.84 W 4,457.74 58.84 335.09 4,150.76 753.73 -398.68 5,961,344.93 691,781.57 70°17'56.163 N 148°26'48.20 W 4,484.59 59.49 335.16 4,164.52 774.64 -408.38 5,961,365.59 691,771.34 70°17'56.369 N 148°26'48.48 W 4,579.83 61.61 335.12 4,211.34 849.89 -443.24 5,961,439.91 691,734.57 70°17'57.109 N 148°26'49.50 W 4,674.66 61.67 336.26 4,256.39 925.93 -477.59 5,961,515.05 691,698.28 70°17'57.857 N 148°26'50.50 W 4,769.87 61.60 336.14 4,301.62 1,002.59 -511.40 5,961,590.81 691,662.53 70°17'58.611 N 148°26'51.48 W 4,865.59 61.57 336.51 4,347.17 1,079.69 -545.21 5,961,667.02 691,626.76 70°17'59.369 N 148°26'52.47 W 4,961.12 61.54 337.21 4,392.67 1,156.93 -578.22 5,961,743.39 691,591.79 70°18'0.128 N 148°26'53.43 W 5,056.13 61.53 337.19 4,437.96 1,233.93 -610.58 5,961,819.53 691,557.47 70°18'0.886 N 148°26'54.37 W 5,150.34 61.63 336.84 4,482.79 1,310.21 -642.94 5,961,894.95 691,523.18 70°18'1.636 N 148°26'55.32 W 5,245.82 60.98 337.09 4,528.64 1,387.28 -675.71 5,961,971.16 691,488.44 70°18'2.394 N 148°26'56.27 W 5,340.41 60.67 336.74 4,574.75 1,463.26 -708.09 5,962,046.28 691,454.13 70°18'3.141 N 148°26'57.22 W 5,435.83 60.09 337.66 4,621.91 1,539.72 -740.24 5,962,121.89 691,420.04 70°18'3.893 N 148°26'58.16 W 5,530.66 60.18 337.17 4,669.13 1,615.65 -771.82 5,962,196.98 691,386.53 70°18'4.640 N 148°26'59.08 W 5,625.36 59.97 336.43 4,716.38 1,691.09 -804.15 5,962,271.56 691,352.28 70°18'5.382 N 148°27'0.02 W 5,720.68 59.92 334.95 4,764.12 1,766.28 -838.12 5,962,345.85 691,316.41 70°18'6.121 N 148°27'1.01 W 5,815.15 59.95 332.83 4,811.45 1,839.69 -874.10 5,962,418.31 691,278.57 70°18'6.843 N 148°27'2.06 W 5,910.21 59.89 330.40 4,859.10 1,912.05 -913.20 5,962,489.65 691,237.63 70°18'7.555 N 148°27'3.20 W 6,004.76 59.91 328.44 4,906.52 1,982.46 -954.81 5,962,558.97 691,194.23 70°18'8.247 N 148°27'4.41 W 18-11B PB2 TIP 6,036.00 60.03 327.98 4,922.15 2,005.45 -969.06 5,962,581.59 691,179.40 70°18'8.473 N 148°27'4.83 W 18-11B PB2 TOW 6,099.13 59.37 329.74 4,954.01 2,052.10 -997.24 5,962,627.50 691,150.03 70°18'8.932 N 148°27'5.65 W 6,193.64 59.24 326.55 5,002.26 2,121.12 -1,040.13 5,962,695.39 691,105.40 70°18'9.611 N 148°27'6.90 W 6,289.53 59.24 323.08 5,051.31 2,188.45 -1,087.59 5,962,761.48 691,056.23 70°18'10.273 N 148°27'8.29 W 6,383.80 59.31 319.82 5,099.49 2,251.81 -1,138.09 5,962,823.53 691,004.14 70°18'10.896 N 148°27'9.76 W 6,478.40 59.05 318.24 5,147.96 2,313.15 -1,191.35 5,962,883.48 690,949.33 70°18'11.499 N 148°27'11.31 W 6,573.37 59.06 317.84 5,196.79 2,373.72 -1,245.81 5,962,942.63 690,893.34 70°18'12.095 N 148°27'12.90 W 6,668.39 59.01 318.43 5,245.68 2,434.39 -1,300.19 5,963,001.90 690,837.43 70°18'12.691 N 148°27'14.49 W 6,763.91 59.05 319.73 5,294.84 2,496.28 -1,353.83 5,963,062.39 690,782.23 70°18'13.300 N 148°27'16.05 W 6,857.57 59.05 321.11 5,343.01 2,558.19 -1,405.01 5,963,122.96 690,729.48 70°18'13.909 N 148°27'17.54 W 6,952.57 59.08 322.71 5,391.85 2,622.32 -1,455.27 5,963,185.78 690,677.60 70°18'14.539 N 148°27'19.01 W 7,047.72 59.51 324.88 5,440.43 2,688.33 -1,503.59 5,963,250.53 690,627.61 70°18'15.188 N 148°27'20.42 W 7,142.15 60.13 330.18 5,487.93 2,757.16 -1,547.38 5,963,318.22 690,582.08 70°18'15.865 N 148°27'21.69 W 7,237.78 60.10 332.30 5,535.58 2,829.84 -1,587.27 5,963,389.85 690,540.35 70°18'16.580 N 148°27'22.86 W 7,332.51 60.05 332.68 5,582.84 2,902.66 -1,625.19 5,963,461.67 690,500.58 70°18'17.296 N 148°27'23.96 W 7,427.19 60.06 333.04 5,630.10 2,975.67 -1,662.62 5,963,533.69 690,461.30 70°18'18.014 N 148°27'25.06 W 7,522.09 60.16 333.30 5,677.40 3,049.09 -1,699.75 5,963,606.14 690,422.30 70°18'18.736 N 148°27'26.14 W 7,616.81 60.08 333.22 5,724.58 3,122.43 -1,736.70 5,963,678.51 690,383.49 70°18'19.457 N 148°27'27.22 W 7,711.08 60.33 333.28 5,771.43 3,195.49 -1,773.53 5,963,750.59 690,344.81 70°18'20.176 N 148°27'28.29 W 7,805.90 60.16 333.72 5,818.48 3,269.16 -1,810.26 5,963,823.29 690,306.21 70°18'20.900 N 148°27'29.36 W 7,899.80 60.12 333.67 5,865.24 3,342.16 -1,846.34 5,963,895.34 690,268.27 70°18'21.618 N 148°27'30.42 W 7,995.19 60.19 333.65 5,912.71 3,416.31 -1,883.06 5,963,968.53 690,229.68 70°18'22.347 N 148°27'31.49 W 8,089.96 60.13 333.96 5,959.86 3,490.07 -1,919.34 5,964,041.33 690,191.52 70°18'23.073 N 148°27'32.55 W 8,184.12 61.31 334.69 6,005.91 3,564.09 -1,954.92 5,964,114.41 690,154.06 70°18'23.800 N 148°27'33.58 W 8,279.76 61.96 335.80 6,051.35 3,640.51 -1,990.16 5,964,189.91 690,116.88 70°18'24.552 N 148°27'34.61 W 8,374.33 61.88 337.43 6,095.87 3,717.09 -2,023.28 5,964,265.61 690,081.82 70°18'25.305 N 148°27'35.58 W 8,469.25 62.68 338.00 6,140.02 3,794.84 -2,055.14 5,964,342.52 690,047.98 70°18'26.070 N 148°27'36.51 W 8,563.91 63.99 338.30 6,182.50 3,873.36 -2,086.62 5,964,420.19 690,014.50 70°18'26.842 N 148°27'37.43 W 8,658.51 65.52 337.19 6,222.85 3,952.54 -2,119.03 5,964,498.52 689,980.08 70°18'27.620 N 148°27'38.37 W 8,754.39 66.69 336.07 6,261.68 4,033.01 -2,153.80 5,964,578.07 689,943.26 70°18'28.412 N 148°27'39.39 W 8,848.60 67.80 334.69 6,298.13 4,111.98 -2,190.00 5,964,656.08 689,905.06 70°18'29.188 N 148°27'40.44 W 8,943.23 68.91 334.61 6,333.03 4,191.47 -2,227.66 5,964,734.58 689,865.38 70°18'29.970 N 148°27'41.54 W 9,038.01 70.06 334.71 6,366.24 4,271.69 -2,265.65 5,964,813.80 689,825.36 70°18'30.759 N 148°27'42.65 W 9,132.94 71.24 336.06 6,397.70 4,353.12 -2,302.95 5,964,894.24 689,785.99 70°18'31.560 N 148°27'43.74 W 7/24/2014 1:58:50PM Page 4 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B©64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 BPB3 Survey Calculation Method: Minimum Curvature Design: 18-11BPB3 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,227.91 72.18 338.24 6,427.51 4,436.21 -2,337.96 5,964,976.40 689,748.87 70°18'32.377 N 148°27'44.76 W 9,323.74 73.49 338.72 6,455.79 4,521.39 -2,371.54 5,965,060.69 689,713.12 70°18'33.214 N 148°27'45.74 W 9,418.70 74.13 339.00 6,482.26 4,606.44 -2,404.43 5,965,144.87 689,678.07 70°18'34.051 N 148°27'46.70 W 9,512.90 74.07 339.01 6,508.07 4,691.03 -2,436.89 5,965,228.59 689,643.46 70°18'34.882 N 148°27'47.65 W 9,607.92 74.13 339.18 6,534.10 4,776.40 -2,469.50 5,965,313.09 689,608.68 70°18'35.722 N 148°27'48.60 W 9,701.98 74.16 338.59 6,559.80 4,860.80 -2,502.09 5,965,396.63 689,573.94 70°18'36.552 N 148°27'49.55 W 9,797.22 74.13 338.60 6,585.82 4,946.10 -2,535.53 5,965,481.04 689,538.33 70°18'37.391 N 148°27'50.53 W 9,892.56 74.13 338.59 6,611.89 5,031.48 -2,569.00 5,965,565.54 689,502.69 70°18'38.230 N 148°27'51.51 W 9,986.74 74.16 339.18 6,637.62 5,115.99 -2,601.64 5,965,649.18 689,467.91 70°18'39.061 N 148°27'52.46 W 10,081.37 74.13 339.68 6,663.48 5,201.22 -2,633.62 5,965,733.56 689,433.76 70°18'39.899 N 148°27'53.39 W 10,176.20 74.10 339.60 6,689.43 5,286.73 -2,665.35 5,965,818.22 689,399.85 70°18'40.740 N 148°27'54.32 W 10,271.21 74.14 339.49 6,715.43 5,372.35 -2,697.29 5,965,903.00 689,365.74 70°18'41.582 N 148°27'55.25 W 10,365.73 74.17 338.94 6,741.24 5,457.36 -2,729.56 5,965,987.15 689,331.31 70°18'42.418 N 148°27'56.19 W 10,461.50 74.16 338.91 6,767.37 5,543.33 -2,762.69 5,966,072.24 689,295.99 70°18'43.264 N 148°27'57.16 W 10,556.13 74.13 339.16 6,793.22 5,628.34 -2,795.26 5,966,156.38 689,261.26 70°18'44.100 N 148°27'58.11 W 10,651.34 74.10 338.50 6,819.28 5,713.73 -2,828.33 5,966,240.89 689,226.02 70°18'44.939 N 148°27'59.08 W 10,746.21 73.91 338.05 6,845.42 5,798.45 -2,862.08 5,966,324.72 689,190.11 70°18'45.772 N 148°28'0.06 W 10,841.08 73.88 337.68 6,871.74 5,882.88 -2,896.43 5,966,408.24 689,153.62 70°18'46.603 N 148°28'1.07 W 10,935.95 73.94 337.17 6,898.03 5,967.05 -2,931.42 5,966,491.48 689,116.49 70°18'47.430 N 148°28'2.09 W 11,031.10 74.00 337.13 6,924.31 6,051.32 -2,966.93 5,966,574.81 689,078.83 70°18'48.259 N 148°28'3.13 W 11,125.84 73.98 337.63 6,950.44 6,135.38 -3,001.96 5,966,657.94 689,041.67 70°18'49.086 N 148°28'4.15 W 11,221.03 73.94 338.05 6,976.74 6,220.11 -3,036.46 5,966,741.75 689,005.01 70°18'49.919 N 148°28'5.16 W 11,315.91 73.88 338.36 7,003.04 6,304.76 -3,070.31 5,966,825.50 688,969.01 70°18'50.751 N 148°28'6.14 W 11,410.83 73.90 338.82 7,029.38 6,389.66 -3,103.60 5,966,909.52 688,933.56 70°18'51.586 N 148°28'7.12 W 11,506.01 73.91 339.13 7,055.76 6,475.02 -3,136.41 5,966,994.01 688,898.58 70°18'52.425 N 148°28'8.07 W 11,599.00 73.91 339.53 7,081.53 6,558.61 -3,167.95 5,967,076.76 688,864.92 70°18'53.247 N 148°28'9.00 W 11,695.88 73.94 339.92 7,108.36 6,645.94 -3,200.21 5,967,163.23 688,830.44 70°18'54.106 N 148°28'9.94 W 11,789.11 71.50 340.22 7,136.05 6,729.62 -3,230.55 5,967,246.10 688,797.97 70°18'54.929 N 148°28'10.82 W 11,885.09 68.42 339.88 7,168.94 6,814.37 -3,261.31 5,967,330.03 688,765.05 70°18'55.762 N 148°28'11.72 W 11,979.38 65.65 340.17 7,205.72 6,895.95 -3,290.97 5,967,410.83 688,733.32 70°18'56.565 N 148°28'12.59 W 12,074.69 63.09 340.34 7,246.95 6,976.83 -3,320.00 5,967,490.93 688,702.24 70°18'57.360 N 148°28'13.44 W 12,169.59 59.91 340.30 7,292.22 7,055.34 -3,348.08 5,967,568.70 688,672.16 70°18'58.132 N 148°28'14.26 W 12,264.81 56.33 339.69 7,342.50 7,131.31 -3,375.73 5,967,643.93 688,642.58 70°18'58.879 N 148°28'15.07 W 12,359.53 53.98 339.29 7,396.62 7,204.12 -3,402.96 5,967,716.01 688,613.49 70°18'59.595 N 148°28'15.86 W 12,454.36 53.17 338.68 7,452.93 7,275.34 -3,430.32 5,967,786.51 688,584.32 70°19'0.295 N 148°28'16.66 W 12,549.29 51.34 338.30 7,511.04 7,345.18 -3,457.84 5,967,855.62 688,555.03 70°19'0.982 N 148°28'17.46 W 12,644.17 47.29 338.05 7,572.88 7,411.96 -3,484.58 5,967,921.68 688,526.59 70°19'1.639 N 148°28'18.24 W 12,739.40 44.28 337.75 7,639.28 7,475.19 -3,510.25 5,967,984.24 688,499.31 70°19'2.260 N 148°28'18.99 W 12,833.51 42.77 337.92 7,707.51 7,535.21 -3,534.70 5,968,043.61 688,473.33 70°19'2.851 N 148°28'19.71 W 12,928.26 39.20 338.12 7,779.03 7,592.83 -3,557.96 5,968,100.61 688,448.61 70°19'3.417 N 148°28'20.39 W 13,022.63 35.18 338.09 7,854.19 7,645.74 -3,579.23 5,968,152.96 688,426.00 70°19'3.937 N 148°28'21.01 W 13,117.49 35.20 338.66 7,931.71 7,696.56 -3,599.37 5,968,203.24 688,404.56 70°19'4.437 N 148°28'21.60 W 13,212.12 34.95 338.65 8,009.16 7,747.21 -3,619.17 5,968,253.37 688,383.48 70°19'4.935 N 148°28'22.18 W 13,306.67 34.52 338.87 8,086.86 7,797.42 -3,638.68 5,968,303.06 688,362.69 70°19'5.429 N 148°28'22.75 W 13,399.65 34.79 339.46 8,163.34 7,846.84 -3,657.49 5,968,351.98 688,342.63 70°19'5.915 N 148°28'23.30 W 13,414.60 35.17 339.03 8,175.59 7,854.85 -3,660.53 5,968,359.91 688,339.39 70°19'5.994 N 148°28'23.38 W 13,478.38 36.00 337.73 8,227.46 7,889.35 -3,674.20 5,968,394.05 688,324.83 70°19'6.333 N 148°28'23.78 W 13,510.88 38.99 335.14 8,253.25 7,907.47 -3,682.12 5,968,411.96 688,316.45 70°19'6.511 N 148°28'24.02 W 13,542.57 41.50 332.60 8,277.43 7,925.84 -3,691.15 5,968,430.09 688,306.96 70°19'6.692 N 148°28'24.28 W 13,574.76 44.33 333.25 8,301.01 7,945.36 -3,701.12 5,968,449.34 688,296.49 70°19'6.884 N 148°28'24.57 W 13,605.79 47.20 333.61 8,322.65 7,965.24 -3,711.06 5,968,468.97 688,286.04 70°19'7.079 N 148°28'24.86 W 13,637.52 50.03 331.84 8,343.63 7,986.40 -3,721.98 5,968,489.83 688,274.59 70°19'7.287 N 148°28'25.18 W 13,669.11 52.97 330.30 8,363.29 8,008.03 -3,733.94 5,968,511.15 688,262.08 70°19'7.500 N 148°28'25.53 W 13,701.08 56.28 328.07 8,381.80 8,030.40 -3,747.30 5,968,533.17 688,248.15 70°19'7.720 N 148°28'25.92 W 13,733.78 59.50 329.12 8,399.18 8,054.04 -3,761.73 5,968,556.43 688,233.13 70°19'7.952 N 148°28'26.34 W 7/24/2014 1:58:50PM Page 5 COMPASS 5000.1 Build 61 BAKER 0 bp Survey Report-Geographic BAKER HUGHES Company: NorthAmerica-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11BPB3 Survey Calculation Method: Minimum Curvature Design: 18-11 BPB3 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +Et-W Northing Easting ' (usft) (1 (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 13,763.95 61.05 329.89 8,414.14 8,076.62 -3,775.02 5,968,578.66 688,219.26 70°19'8.174 N 148°28'26.73 W 13,828.20 60.87 329.91 8,445.33 8,125.22 -3,803.19 5,968,626.52 688,189.86 70°19'8.652 N 148°28'27.55 W 13,859.70 61.01 330.60 8,460.63 8,149.12 -3,816.85 5,968,650.07 688,175.59 70°19'8.887 N 148°28'27.95 W 18-11B PB3 TIP 13,888.00 59.95 331.23 8,474.57 8,170.64 -3,828.82 5,968,671.27 688,163.08 70°19'9.099 N 148°28'28.30 W 18-11B PB3 TOW 13,922.01 58.67 332.00 8,491.93 8,196.37 -3,842.73 5,968,696.64 688,148.52 70°19'9.352 N 148°28'28.71 W 13,991.33 59.61 328.89 8,527.49 8,248.12 -3,872.08 5,968,747.61 688,117.85 70°19'9.860 N 148°28'29.56 W 14,024.32 59.76 326.32 8,544.15 8,272.16 -3,887.34 5,968,771.26 688,101.99 70°19'10.097 N 148°28'30.01 W 14,054.99 59.90 323.54 8,559.56 8,293.86 -3,902.57 5,968,792.56 688,086.21 70°19'10.310 N 148°28'30.45 W 14,086.75 61.21 320.96 8,575.18 8,315.72 -3,919.50 5,968,813.98 688,068.72 70°19'10.525 N 148°28'30.95 W 14,117.92 62.36 319.13 8,589.91 8,336.78 -3,937.14 5,968,834.57 688,050.55 70°19'10.732 N 148°28'31.46 W 14,149.86 62.83 318.38 8,604.61 8,358.10 -3,955.84 5,968,855.41 688,031.32 70°19'10.942 N 148°28'32.01 W 14,181.25 63.98 318.46 8,618.67 8,379.09 -3,974.47 5,968,875.92 688,012.16 70°19'11.148 N 148°28'32.55 W 14,213.18 65.82 317.42 8,632.21 8,400.56 -3,993.84 5,968,896.88 687,992.25 70°19'11.359 N 148°28'33.12 W ! 14,244.53 67.73 316.46 8,644.57 8,421.60 -4,013.51 5,968,917.41 687,972.05 70°19'11.566 N 148°28'33.69 W 14,276.00 69.50 314.61 8,656.05 8,442.51 -4,034.03 5,968,937.79 687,950.99 70°19'11.771 N 148°28'34.29 W 14,307.53 72.06 313.11 8,666.43 8,463.14 -4,055.50 5,968,957.86 687,929.01 70°19'11.974 N 148°28'34.92 W 14,339.38 74.25 311.85 8,675.66 8,483.72 -4,077.98 5,968,977.86 687,906.01 70°19'12.176 N 148°28'35.58 W 14,371.25 76.44 311.57 8,683.72 8,504.23 -4,101.00 5,968,997.78 687,882.48 70°19'12.378 N 148°28'36.25 W 14,403.20 79.36 310.91 8,690.42 8,524.83 -4,124.49 5,969,017.76 687,858.47 70°19'12.580 N 148°28'36.93 W 14,434.15 82.66 311.13 8,695.25 8,544.89 -4,147.55 5,969,037.22 687,834.91 70°19'12.778 N 148°28'37.61 W 1 14,467.39 86.15 310.60 8,698.49 8,566.53 -4,172.56 5,969,058.22 687,809.35 70°19'12.990 N 148°28'38.34 W 14,500.21 89.80 310.36 8,699.65 8,587.82 -4,197.51 5,969,078.86 687,783.87 70°19'13.200 N 148°28'39.07 W 14,529.18 92.45 309.63 8,699.08 8,606.43 -4,219.69 5,969,096.90 687,761.21 70°19'13.382 N 148°28'39.71 W , 14,563.80 93.90 307.37 8,697.17 8,627.95 -4,246.74 5,969,117.71 687,733.62 70°19'13.594 N 148°28'40.50 W 14,594.84 93.76 305.23 8,695.09 8,646.28 -4,271.70 5,969,135.40 687,708.21 70°19'13.774 N 148°28'41.23 W 14,623.20 92.11 303.88 8,693.64 8,662.34 -4,295.03 5,969,150.86 687,684.48 70°19'13.932 N 148°28'41.91 W 14,656.60 90.40 302.50 8,692.91 8,680.62 -4,322.97 5,969,168.42 687,656.08 70°19'14.112 N 148°28'42.73 W 14,688.09 90.35 300.04 8,692.70 8,696.97 -4,349.88 5,969,184.07 687,628.76 70°19'14.272 N 148°28'43.51 W 14,717.36 90.19 297.70 8,692.56 8,711.10 -4,375.51 5,969,197.54 687,602.78 70°19'14.411 N 148°28'44.26 W 14,752.09 90.01 295.52 8,692.50 8,726.65 -4,406.56 5,969,212.30 687,571.34 70°19'14.564 N 148°28'45.17 W 14,783.66 90.01 293.91 8,692.50 8,739.85 -4,435.24 5,969,224.76 687,542.34 70°19'14.693 N 148°28'46.01 W 14,811.15 89.98 292.16 8,692.50 8,750.61 -4,460.54 5,969,234.86 687,516.78 70°19'14.799 N 148°28'46.74 W 14,846.30 89.98 291.30 8,692.51 8,763.62 -4,493.19 5,969,247.04 687,483.80 70°19'14.927 N 148°28'47.70 W 14,877.59 89.95 291.24 8,692.53 8,774.97 -4,522.35 5,969,257.64 687,454.37 70°19'15.038 N 148°28'48.55 W 14,904.95 90.01 289.62 8,692.54 8,784.52 -4,547.98 5,969,266.53 687,428.49 70°19'15.132 N 148°28'49.30 W 14,940.20 89.98 287.44 8,692.55 8,795.72 -4,581.40 5,969,276.87 687,394.80 70°19'15.242 N 148°28'50.27 W 14,971.81 90.45 286.81 8,692.43 8,805.03 -4,611.61 5,969,285.40 687,364.37 70°19'15.333 N 148°28'51.15 W 14,999.71 91.16 286.91 8,692.03 8,813.12 -4,638.31 5,969,292.81 887,337.47 70°19'15.413 N 148°28'51.93 W 15,092.80 93.00 284.25 8,688.66 8,838.11 -4,727.91 5,969,315.49 687,247.27 70°19'15.658 N 148°28'54.55 W 15,189.08 93.61 282.04 8,683.10 8,859.97 -4,821.50 5,969,334.95 687,153.15 70°19'15.872 N 148°28'57.28 W 15,282.83 92.50 279.30 8,678.11 8,877.30 -4,913.49 5,969,349.92 687,060.76 70°19'16.042 N 148°28'59.96 W 15,378.70 91.33 276.78 8,674.90 8,890.70 -5,008.36 5,969,360.89 686,965.58 70°19'16.173 N 148°29'2.73 W i 15,472.49 90.56 273.86 8,673.36 8,899.39 -5,101.72 5,969,367.19 686,872.03 70°19'16.258 N 148°29'5.46 W 15,567.65 89.92 272.98 8,672.96 8,905.07 -5,196.71 5,969,370.43 686,776.94 70°19'16.314 N 148°29'8.23 W 15,601.00 89.92 272.98 8,673.00 8,906.80 -5,230.01 5,969,371.31 686,743.60 70°19'16.330 N 148°29'9.20 W Projection to TD 7/24/2014 1 58.50PM Page 6 COMPASS 5000.1 Build 61 WC- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 BPB3 Survey Calculation Method: Minimum Curvature Design: 18-11 BPB3 Database: EDM R5K-Alaska PROD-ANCP1 Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +El-W Northing Easting -Shape (1 (1 (usft) (usft) (usft) (usft) (usft) Latitude Longitude T10.4 0.00 0.00 8,694.50 8,845.27 -8,585.48 5,969,224.00 683,391.00 70°19'15.695 N 148°30'47.12 W -actual wellpath misses target center by 3356.10usft at 15601.O0usft MD(8673.00 TVD,8906.80 N,-5230.01 E) -Point T10.3 0.00 0.00 8,694.50 8,885.94 -7,085.86 5,969,303.00 684,889.00 70°19'16.110 N 148°30'3.36 W -actual wellpath misses target center by 1856.09usft at 15601.00usft MD(8673.00 TVD,8906.80 N,-5230.01 E) -Point 18-11B T10.3 0.00 0.00 8,694.50 8,885.94 -7,085.86 5,969,303.00 684,889.00 70°19'16.110 N 148°30'3.36 W -actual wellpath misses target center by 1856.09usft at 15601.00usft MD(8673.00 TVD,8906.80 N,-5230.01 E) -Point 18-11B T10.2 0.00 0.00 8,694.50 8,912.37 -6,085.80 5,969,355.00 685,888.00 70°19'16.379 N 148°29'34.18 W -actual wellpath misses target center by 856.08usft at 15601.00usft MD(8673.00 TVD,8906.80 N,-5230.01 E) -Point 18-11B GeoPoly_ext 0.00 0.00 64.50 8,350.39 -4,413.53 5,968,836.00 687,574.00 70°19'10.863 N 148°28'45.37 W -actual wellpath misses target center by 7348.01 usft at 11685.80usft MD(7105.57 TVD,6636.84 N,-3196.88 E) -Polygon Point 1 64.50 0.00 0.00 5,968,836.00 687,574.00 Point 2 64.50 469.53 338.14 5,969,314.00 687,900.00 Point 3 64.50 977.66 -832.32 5,969,792.00 686,717.00 Point4 64.50 784.12 -4,880.83 5,969,495.00 682,675.00 Point 5 64.50 372.05 -4,806.34 5,969,085.00 682,760.00 Point 6 64.50 298.11 -4,692.18 5,969,014.00 682,876.00 Point 7 64.50 219.37 -3,647.79 5,968,962.00 683,922.00 Point8 64.50 361.37 -1,221.23 5,969,166.00 686,344.00 Point 9 64.50 0.00 0.00 5,968,836.00 687,574.00 18-11B T10.4 0.00 0.00 8,694.50 8,845.27 -8,585.48 5,969,224.00 683,391.00 70°19'15.695 N 148°30'47.12 W -actual wellpath misses target center by 3356.10usft at 15601.00usft MD(8673.00 TVD,8906.80 N,-5230.01 E) -Point T5.4 new 0.00 0.00 8,694.50 8,843.32 -8,665.56 5,969,220.00 683,311.00 70°19'15.675 N 148°30'49.46 W -actual wellpath misses target center by 3436.20usft at 15601.O0usft MD(8673.00 TVD,8906.80 N,-5230.01 E) -Point T10.5 0.00 0.00 8,644.50 8,831.09 -9,087.04 5,969,197.00 682,890.00 70°19'15.550 N 148°31'1.76 W -actual wellpath misses target center by 3857.87usft at 15601.O0usft MD(8673.00 TVD,8906.80 N,-5230.01 E) -Point 18-11B GeoPoly 0.00 0.00 64.50 8,350.39 -4,413.53 5,968,836.00 687,574.00 70°19'10.863 N 148°28'45.37 W -actual wellpath misses target center by 7348.01 usft at 11685.80usft MD(7105.57 TVD,6636.84 N,-3196.88 E) -Polygon Point 1 64.50 0.00 0.00 5,968,836.00 687,574.00 Point 2 64.50 469.53 338.14 5,969,314.00 687,900.00 Point 3 64.50 977.66 -832.32 5,969,792.00 686,717.00 Point 4 64.50 789.40 -4,774.65 5,969,503.00 682,781.00 Point 5 64.50 298.11 -4,692.18 5,969,014.00 682,876.00 Point 6 64.50 219.37 -3,647.79 5,968,962.00 683,922.00 Point7 64.50 361.37 -1,221.23 5,969,166.00 686,344.00 Point 8 64.50 0.00 0.00 5,968,836.00 687,574.00 T10.2 0.00 0.00 8,694.50 8,912.37 -6,085.80 5,969,355.00 685,888.00 70°19'16.379 N 148°29'34.18 W -actual wellpath misses target center by 856.08usft at 15601.00usft MD(8673.00 TVD,8906.80 N,-5230.01 E) -Point T10.1 0.00 0.00 8,689.50 8,499.59 -4,223.64 5,968,990.00 687,760.00 70°19'12.332 N 148°28'39.83 W -actual wellpath misses target center by 84.50usft at 14461.37usft MD(8698.06 TVD,8562.62 N,-4168.01 E) -Point 18-11B T10.5 0.00 0.00 8,644.50 8,831.09 -9,087.04 5,969,197.00 682,890.00 70°19'15.550 N 148°31'1.76 W -actual wellpath misses target center by 3857.87usft at 15601.00usft MD(8673.00 TVD,8906.80 N,-5230.01 E) -Point 7/24/2014 1:58:50PM Page 7 COMPASS 5000.1 Build 61 ri- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site: PB DS 18 MD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Well: 18-11 North Reference: True Wellbore: 18-11 BPB3 Survey Calculation Method: Minimum Curvature Design: 18-11 BPB3 Database: EDM R5K-Alaska PROD-ANCP1 18-11B T10.1 0.00 0.00 8,689.50 8,499.59 -4,223.64 5,968,990.00 687,760.00 70°19'12.332 N 148°28'39.83 W -actual wellpath misses target center by 84.50usft at 14461.37usft MD(8698.06 TVD,8562.62 N,-4168.01 E) -Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 13,446.00 8,201.20 INTERMEDIATE CASING 1 7.000 8.500 Design Annotations Measured Vertical Local Coordinates Depth Depth +NI-S +E/-W (usft) (usft) (usft) (usft) Comment 2,654.05 2,653.97 -2.09 -6.69 18-11B PB1 TIP 6,004.76 4,906.52 1,982.46 -954.81 18-11B PB2 TIP 6,036.00 4,922.15 2,005.45 -969.06 18-11B PB2 TOW 13,859.70 8,460.63 8,149.12 -3,816.85 18-11B PB3 TIP 13,888.00 8,474.57 8,170.64 -3,828.82 18-11B PB3 TOW 15,601.00 8,673.00 8,906.80 -5,230.01 Projection to TD Checked By: Approved By: Date: 7/24/2014 1:58:50PM Page 8 COMPASS 5000.1 Build 61 co 0 CUas Cr---- W_-. N JO c a o W I O C N -83) E) W '4" c° (O c o. = d = 0 Q d ai o t o U O O V) O 0 CU o rn o F co F.. Z I-' o "C 80 c01 3 O_ COC m .- m U,- 0 W UU m X O O Xo a mmm Yo m o Cl) ' U E E CQ7 a a CQ7 N a) .0 LL 0 .0 LL 0 878 ID IOOOON 0 O tN N O O O X N W N y O O O N O 3 E O a) N iO m iii O L VO O In o a) N N 2 . N 0) N N N V +� C x C U C x C 0 ^ N E �. ❑ 0 W O 0 2 ❑ W p 0 r) a) 0 0 o w U r as Z 0 0 0 far a a -3 W o E O ~ i- o O a) a w Co a) 2 o) I O O i 0 rn > o 13 a) a) W V C U K CO Ct C a) m ^ ^ a) E .0 m .0 o 4 N c W 75 d U O E; .0 d 7 U U Q N > J O Y') OD > a o Q o v o U) O r) 1- co v- CD m N C E E D d 3 0 CO CU N d a > .� > ... '., iii N J O Y a• E O z` a' O a) 0, o ce a) C c ri C. v rn c g FA o g to 0 Q ���// w 0 v c .. o. in N > a N N > J re C O O N N N U U �' N CU U a) E �' o E o 0 a) x x ? > c a) x x > > d Q co a) p o m 0 ❑ W W Vd DI O W W (n d > C o ` m oooc ov = m .a 'o '0 a) 5 .= Q 45d a) a u D Ed 3 = ao E a p u. 0 Q DJu, 'U • n Ugr O U W V CCC CC O O W -o 0 Z Y CO Y �_ N �_ C < aD N 0 .,..-c, co 0 a Cl) 0) a 0. csi CLm .. O a O N O O N O O O N CO O Cl 8C) O U U) Z 3 C U O N U N o O N ❑ a) a) a) m .- ,- C) U) r) co ca E -0 E E d ❑ a) 0 r Z > 0 N Ol U U) U) x Q .0 N .0 N N 0. C cc E C I H d O fN O Z in "iN a) m C N N a3 C N Q Z U) Y LL W ❑ m a Z Q o u O a Q 11 Z 0 O Y o U Z W U 0) Ct W W ❑ O Y N O N O O N L O V CC 0 2 W > x I OW a Ix .0 Z < a o I Z U W E U U o w � vo) o 71 aD o co 0 ZO J J Z LU a a o wvt O m U) — rc„ re Cr) U) 00 F U d .- N CO a) <f W ❑ @ 03 Z co N w u) U Z Z o WO 0 d W NEmZ _ a) m w Y W c m E In 0 z W Q a .c C N 'O Cr 0_ N ` U) U) 0) a) a) 0- a `o o 0 -o i)) FE-- m a) E oa) ao) m 1) ami cUi 0 o •• 1- 0 O ai > o E n u ai m E n CU ai m u E c ° n o el ami .� E Z w D. a o 2 ~ N > o. o C7 c o ° > o -• .0 E E N m .a a as a -a Y 0 D on a Z' a a . a`) -0 w v CC0 m O a N a) 0- O a) 0 0 j N N L_ 0 N .? 7 '5 N N L_ > a) O O f0 0 o_ W 0 ' 0 U a i m u. u) a Y co 0 2 0 tL m a } to 020 0 ❑ ❑ ❑ co U O L N cis 0 w N m N C IL Q L o O) a) a Q Co a) 0 a N N of jn d d OU d v E E m _i . • E O U H H j - = a m _ O O a) (r-6) E fn CO Z Z a)Ix N u m [1 a) .� L a) v o U U co o I- e, m co rn 0 ~ i • O rn F)D H o v a) E 6 rnin E m o z in 2m 6 - a � U_ F w 0) E E L o a) N H U O ,`" E = a a Z a a) .. U U aa) - a12 c 0 o 0N y r m Z v) o c 0 o. = w o'� r n o a) o. LL r') m CC U Q X a) W Cl L z a-.,--,„. O E m LL Co o a) a`) 2. I- 0 U p- m Z to E w a a a W F m a a= 2 a = (7.) E E - /11 0 c E U Z Y • N m O .- E a CO v n a 7 L p o m > > Z W Ec. LL S C E m w a O O a) u d U a) � a 3 O 0 in > a` ° `S CO d JCii c t m a) m 0_ m v ? o d Q 0 m a a) o d a c rn L _ a) n E d O Q N W d E c 0) .� a n '�O m a O ..„ N d J LL g .m o a) E E a > >- r y `> 1- O c a) a Q d m U N a) m c) p > .0 o -o E -o V , g as E c E d 2 ,,T; am TO E E E d N d c 41 C ° o N o y o U . a z H 0 ._ y U W a`> d it w o o a E x12.-C a) 3 .E 8 10 m ii E o p •41 o co a O to 12 N a-a, 0 C Q d04 -p a) a m E 3 0 c E 3 w Q V W m 5 a"' a ° } Cl) a) I OH -, w CC 2 o w m LL a Z zv a a E, Q C o m 0 • n c\ a Co o 6 m w C u Z E O O. U a) N LL d I a a) N = "O_ E LL "O a N N d Co I co m E -0 7 . g H n Z U a 0 Z > LL a m I O (O u) a Q o U °? E a• L, 0) o N C ( co-d 0 o H L C O N • J YO in p 2 n C U R o 3 r) a) U E o- C a) O O LL v 2 cO O O c- H 2 m J O rA V x d' z _ N 00 m CO 2 H O n O O o w v LL H O I N m f0 d ' • E _ 0 -- n m QE2 o � Qp )a (% m)) u Z NV OF W • J w a z o a d 0 O ,x o O E a 9 a ai Ix o ? E a « co w N O p 7 < W N -▪ -;,- > N y w0 O � � > a o U w z z z w0- .'7 I 0 LL „ O C C T Z O o U z a) a) 6 E 0m r z - z a H H o y Z w Q O o m w Lo c of m t v') O W v m- rY 0 Y d LL Cn N W a) a' 01 ern a) C O a H N W U d tY V a) J N E mz W o 1E-`) o � N U E J a) UF- N ca Z Oo W a' m CC a U O W H n Q J a H > U d N O -0 Q N ? Q Z CL o. o No E o_ H p o N • d y ' W -o o .. F U o '.. a H y W a) a7 a1 H z a) E a�oi m >n v m W a) 3 a` o 0 O U `o Z c E • ° > O > L m O a a) ce N 'O m v d d J d U a W U D 1' cf c w E d CO c o w o d c, W LL 0 H H 0 U D m U m H I U i Co 0 N LL O N ( U1 ' m: t 0 a N ce O C O a0 O • LA 0) 0 O N- 7 W N I N • E N V= CJ U o • m a 0 t O Z - F- a W Z al 0. u- c%, W re co ¢ x 20 W W 00 gg MO_ OW O 0 O m H J Z m — co J m . m6 M a) a) 7 Q m d J d©0 W W 0 m N w ce ce c O w D LL Q w N fn Z O ce Q '• a) LL O W r C as O HD J Z o 4- y Ix 1.U) d m E cce o O F > -J LL Q N t� LL 0 g > } co Z N L V N 7 > O � OZ Wm 0 O O LL LL O 2 w a 2 0 w . Z sr ee CO (Jo7 ZZDnw m Lim CO2� m m LL co D w W W m ^ d CO OJ F- 1- wF- ~ r, w Om d w w w w w a LL X O m Z E m m o , m m w w 0 N N - o o r o . 7 W Y W Q m m E -a o F. - 77 (00W o 0 F- - - ()- 0- - (7) W - 0 0_ O `° a) O a LL v) m ¢ g Z > �,� m Cn Cn o Cnaw com m 4.N - J 0_ 0_ F- LL m W Ig rn v w CO o r ua-, o u, N` CL ©w C� O X in m Q 22 " N - - N- 0 HI g ., w a � O as U ;jaLLZ mLm ��oo � -D � ma� YLLCC w i7 O O J J O 0 m m m F- o LL O a j m O Q J J LL LLJ LL — } mIw w w 0 Dy '', mX � LLLLZZLL 0 mo11- fn (- c:50 (,.4 u) Wm ZZmaZflQ 0 ,,Q = 000002 �2W » HH0 > Z m0aw aLLOOw CraM F- F- W WF- ~ — Z U' Z W m LL wm W W W W w a W < 0 .‹<IZ m Y O O LL o o J Z = J w W m m U) J�_J N- cco00 2mI= � 00 OW _ = H m 0- LL d a a o m o J 0) ..w ..7. Z W z U a ~ m iH D2ovuo, ^o �r, o0 m -,cnz � a < 0Z Z = � LL oa o, oU � a mmOO OOLLLLO � o 0 acn = r- Na m N- OF- OHOam W N 0 W HOa (LOaa MO v , - O F- HD = W O Og5a00 - 000H wHaH � a W ON ~ LOL N O 0 00(..) 1-- I a 2mO 2Wo 'n zOZHZO -- O ? aa � Z � m > N Ce O00 J mu) j N 0 U) 0) co a. 6 a :,12. N 0 O 0 O O V V N m V C V a a co C O_ O_ N O L N O 0 0 Ili 2 U) m C O N O CO J O O c7 (r aD O V Nai E L, E y, O (n >. 2 N >^ 2 N N a, -0 LL 0 la LI- 0 , 11, ,' �. 0 (^CO I • N N a) N co aJ 2 a a a 7 m W x V) N W N CU al CU (a m (a O I� -a E L CO 0 L 2 2 a O > a) z. N . ' a) D N c7) 2 N aUC aihi o~ o C 2 c)N 0 0 CC(n Q _ 0 0 _ )) O O a a- — N cc N 3 m m a co (n I ^ a a O a a, a a a s up a s a(n D 0 0 >- -J0 } M Q 2 O • \ o 0 Ca V O O N N E E n ,) a CL � o ' m CU d a (o > 0 > t+ , a7 N l6 0 Y . a) o Z+ a) o �( C O a. a) CO C 3 C N a 0, C o fn O 2 (n O W, v v _ a Niii (n a N N > �Ny a) _ _ Z. _ J 1.1. E O 0 N a1 N N U U N N U V E o E o W p a) X x > > p a) X x O 5 Q 0) > o 0 a) 0 0 o W W v) av o W W (n a C O C (O r >O a N CO CA O) a7 (1) a) N a) 6 (a c a1 E E 3 c -6d 0 y -o LL u. V c ° Y ) 4---a' p(D� a7 a' a = O 0 O O L.L. V -O O' O O Z Y CO CO133 �_ 0 d CO Cl),-- a. . U) N a a cn m a a r 0 O (1 O E 0 N (OO 0 0 a7 co (00. 0 (n Z c (/) o 4 0 v. � o O ai d m C m co m E -o E EL 0 CO , a) .t > (.) (n ' Q U U) U) a' < O O Q, ja�7 O a1 O Q > 1 O N 5 , > O `y N N W } N (p C N (q N N C0 cu W 0 0 - 0 0 0 m 5 - O 0 Cr D CO CI) co W Z a a Z 0 0 F O - O O Z_ W Z 0 CO a. F- F- W =' w 1 0 W W O W 0 yy, O N IX 0 OW > Z. W O W M 0 CC CC a ~ N r 0 a Z W LIJ 0 ) Z U W a 0 0 0 W co N O ZO J m Z Z WCL. s o W a Cr• o m !r o (n a a, CO U) rn F 0 V) ,- of v O N C m w z 0 O >, W a) W (n 0 W N E CO Z .W 0 r a) W N m w Y O (n a m m E 0 n z L W Q co t a a a N E CU CU O) CU c a` a o oN 0 a •m m .9 _ m E d 0 a) -o O �� 1- V o v O a, a y a) (n E a N ai [n E U 2 (n n C c O O N {6 rT a) ; T p W �>. a) T p C a� c a) a) - n • m 2 w w F- 2 w co F- Io ° i o . E E cum a s °a le a w M Z' a D u o a .) 0 a W 0 : o (0 0 a 0 n = '5 ''5 ,, m L a a) o > > a) a3 a CU 'u. (n a > (n 0 2 0 U. (n a 5- (n 0 2 0 1 N O 4.6 N Q N < N E N C a Q L an Q co a) a 'C w ✓ 0 N J f L5 a O O H O - _ N N @ 2 m 0 a) ° a a) 'Oo U > > a) chi ° X O O X U = v Z Z a 3 a c m m a C7 0 o O o -- a) L �_ a v a O O O O H .. O N O N O� a, °O CO (C; I O O O N a) I- 0) 0) U ..- 41 O I� . F- ~ W V > > n p N -• m a) - W zi) an 1 O m C.? C U o a Z ci I� O a a N N ii Z V. 0 ❑C a 7W O U J CU a W VS a) CC N < X in m = E O ' 0 o) co — z z Orn -6',N o a E3 "c a s z (n C a = a p 0 O o a- ren > CD 1D - a) U CO 2 1 J N F a yr m 0N ❑ aN ° _ aai e o ` m U a) n E °C ° N a) et Q 2 co a E L > H 0 a ° ' EcE C o EU m v co 3)m F o E w (1) J a Z H OO 0 U o' E U, a' a` ❑ 6 m a° ❑ t d N Ln N v Q COaE) 0 0 0 0 aa)) o = V a © a 0) 0 I F- 1 4 a S O w 12 a Z Y CO _ a N D N d loo Li m N (n z N - o) L❑ ai N afl (n iO- "O a a FZd a)Z > ---E- a w aU o O acn in CC Q a"2 'Ui L-o a m o. v U o U) J H N Z E a E ° O W ° ❑ a) O = m CD H `,75VI X a . J 0) N Q z (D Y m m H ° a 2 Q o) U N — 2 f° O ) ¢O Lt O O W W W ❑ m c F . U Z Q O w (o < ❑ W 0 - N Q ❑ a 2 z N W a a Ln Z o d r. 0a o O E a 4 CO M - O = - l9 3 ^ N O 0 > ° 0 w z a z z v v = C) c c(./) Z o. > H a) O m rn E 0v c y • a ❑ E O) -° N 117 O U.1 N N A G 0 N W •oZ co E 0 aJE m Z ! CNI W Im D11 3 ZZ O O a - a 'LO a d N -o oo da) a N LL j 3 N Z" N a ° 15 ~ N l0 �) N W E N 7 C tT 3 7 O D LL E .O N o (n h O UW 0) o a a) a N -o a -o a s a m -° Woca O Na U 0 c 0 a) ,-c, OO cH H 0 0 D CO 0 00 f- S N O CU 0) MW a Q J Q V .\-'.. O c _ a 2 OO >- W W o O o W om m a cN- c a WOC FUN (r) L O U O ( 2 N OOi_ CO Z I- C O C o cp N < O O co U U U a) iii C a Y NI. N r o E ,, E Q °° °° W 7 o O N -0 W O -0 i O N0U y NU O O O O N- O O O O cr N- I ; N N O N W ; NN O C O NaDO) O X ▪ a0 0 In co m 2 W L L o o > a) Z' 0 L' a) Fit tr) NO) , N C x C N C ECO O) E c _ JC ?O N O O W •�o O O W O O .. U ,- 0 O O Z a IW a O a Wo E• O I- 0 0C rn a a) o R W o >- o -o c U) CC U) CL a) 0) D e a) E ^ .c, J _ -, U n 0 o >CL -a_ oO } J - • Ui Uco) O F- M O 7 R )n E) 6 aiC m E E 0 0 m .�-. a) J < • > d > at O z' N O Z' N O 0 ) C 0 j O• O 0 0 O O OI C co O O U) p O U) Q. w a' c O n )n w > a u) w > re a) _ _ _1 I.L a) li.C O 0 3 N in U U N N U U N N o E O o a) X x ? > o a) X x ? 5 Qt Q CD 0 O c\ u-, at a O W W U) a O W W U) a > ' = o = v c Q 4.1 w o mT. n MI a a`) d `mn LL LL a 0 E E o a=) a) a O E L V N a a) -t WGO o rn o Z Y m I O w o iO ^0) - U) CO 0) N d CO -0 U) 0) S] d =- CO _ .. .0 .. O. d O. O _O^ N O O 0 N 0) O O U) Z C V) U1 O �") N CDU) O 0 C C a) O) CO O C) 10 ao CO O co c E -100 E c a 0 a) a) a) r Z > 0 in a) A U U) co CL < O O a) a) d cc• E C cc 3 F 2 z U 5 F° 0 U' 0 2 1° a) U' g Q 0 U Q co O O O a' J J W w O m a 5 5 ch Q O Cal wa L 0 z W J Z Y o CZQ U Mw O O NWOU = o Oz I m O C07 7 U w a Z L I O)) a Q N -' W Z 2 O 0 c < a0 o W _ ( o IO E uu)0 a w Cl)a2 o 1_ U a r o a) v ai m Z 2 0 `0 W U) 0 W m 2 E co w o E > m CU a w N Z )) 0 a m a Q •c c E u) U '- a) 0 U a N 0) m 0) m d` - m E U j C aEgi °' " ca a o o o aI= m EN aC ai a ~ oCco ` > "E 03 N . C T o z - w O > T 0 EE a Y ` a OY ` v o a 2 > o > E m I . o S a -o a) W a Z' -o a) w v Oco O a w 0 °'j 0 0 aa 7a LL iiO 0 LL iY w O 2 c O 0 0 0 O NU 0 aa N O L N O a' to co a) CO C W Q _c O) N _ Q m d l0 u _- O _ _ o v EE - J .OE co O a) FO "O = a) N 0 H co co o cu a > c a > a) U L E (n ca D Z Z o 0 'U 0 `-. uim o u, n N• — E O L Na.) o a` r a` - >. c N 0 U N O H a, m 0 ~ w - O N o m a) FTD W c. a) E )0 a) > E O O Z_ _ N N N a) al �_ U o m N E - a a° z O o d .. U O c 5 a H C ca O (7 N 7 N_ -c O Z v m5 c o. .W O C J Cl) a LL r) Q_ t/) < X N CO La o_-r,,, E c a) Ua W E N B c o H v = E aa)i a) 2' N a o) E a) rn o) ^ E Z z a E is v ova. a .c a V L O o CO Y D a Z N NE CO , .N LL = d C O am o- = `U awa 3 oCL a, > u) a a Co d m J E m m - Z' 73 B ms Q. aa) COw L a afE . OC N p j co d W ix 2 o CO a) c m a)) = = a m in m N 0 ) v Q' E a s -o Q ca V `) E a a ; > r U m` H - 0c y - Q > t°7 in y m j H ii O « ? n 2 aci G o E m c o aoi E E c E 0_ U C o enB- o m n U ~ a Z H U p E v o U E N d a w o0 o a E )-` F- 1 5 8 f0 m E E oo w y ^ o m c O U (2.' o -p O Q r -o a) o_ o a y E 3 U E 3 o UCe @ 5 a o c" co U x° w _ Z Y CO F- a 0 NI- - u o o a) rn N d CO O •` CO C] 1= V . _ .. W p Vi ^ 5 N U N N a. ✓ o E o a co u F 0 a- m m E -o 2 a z - b a 0 Z> LI ao m 0 (n LU.) Q < o U •a; E Z•M j o N o o m m 2 -O CO J N LL o E o a 2 o 0 O _ - .O_. 'E F = m o rn O u E v x cc a ', 00 m E. 0) a) F .. a) O 0 a`) o LU O 2 m 3 0 0 E a) aa)) - o v o N m E LL N O _o z m o co 5 W a 0 a N ^ C O Eaca n O 7 a N z O 3 a > a a O R! a L 00 0 N O U lL Z Z Z co C7 LL N O c 0 W Z a) C T \ W J a F 00 E a) a) `- J H Z 07 O O 7 0) 0 w O) 0 ), Z o ELL @ W a) a' at c O N E co O W o _c d U) 0 E 7 U a) J N CO z o 0O a' as cG a a) r _ Q J_ dCO U V a N N D Q U N p CL d o a) W j a N CO .. - U O :_. a F- N W N N m Z o E U ~ N Y L a z N C j a Q O O C E 0 y L v O) O W d , W a) a U a Cr- 0 a a W' 0 > � c w E d m e `o w `o o U F- H 0 U D m U m F- 2 111 ' Cr" IDC cu amu./ 1.0 _ cu V bp U L (\1 6) O Q O- L O O O L L C 0LU v W H >.• Qcoco Q N Z u N E ,, OLu -loco O r' Q c ° o 0 W Q y JO 12 ra ID Rs O > Q 0 ori U a m o v co E L U �, L Q *' N O +_ccC Y VI U. r r 7 - e- .- C co ro N >' a) T �+ C C >' C C >+ C C C > C C >+ C fl- Z 0 O lv cv3 3 cu 7 7 A mm 3 C at a C 3 C cz 7 C c OU O > .1 -' -9E E -) -) 2 -) E -) -) -) ' 2 -) ' -) ' E -) -9 -moi a) a) I- F N U) M 4 4 co' rn M N r or O V 4' M N T 4 T U ..., CO T, ;.. Q N M - N - — N l- ,- l- M l- l- N L L 6 ® f0 N U OCa C C6 1-0- 0 .--4 •,"n QJ E 'O vi O vO c v CO O_ y CO c C O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v a''00 0 v Cid W W W W W W W W W w W W w W W W W W W W W w • U. LL U. LL U. U. LL LL LL LL LL LL LL U. LL LL LL LL U. LL LL LL @ a) -c OU J J J J J J J J J J J J J J J J J J J J J J 4*., a > - E Q Q Q a a a a a Q Q Q Q Q Q Q Q a Q Q a Q a Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z C F 6C O O O N v C _o O LL LL U.. LL LL LL LL LL LL LL LL Li. U. LL LL LL LL LL LL LL LL O LL C _O L N +0 41 4--4 G M N + L Z 0 i± C (6 0 4) U .lU 0 O z O 1:3N a O CC M W En N IX n J 2 2 ~ L.L. LL LL LL LL W Ual UJ LL LL-1 0 u� C C' Q d' W U d V F U a H U a Ce o CC CC CC fn !n [+'6 �''+ O `J -ICLLU-Ja30° 0° � Qm � n Q.a °OWaQaaa > > o !Ti as a6 CO w H t� F a I- a LL a I- 41:; a `� a LLI 112 V > cis O W W. w► I► ; ssio v a >- >- >- `. V CY d' CC Wa) H J J J J J J J J J J J J J J J J 0 O 0 O J J Lig0 3 3 3 3 3 3 3 3 3 2 2 2 2 3 www w t u E 2 E E v u O N CC UJCO Y H CA >- MI NcY X vO w >- >- r y r } r } } >- >- } r } } >- } } >- } >. n Jd W QQQaaQQa aQQaQQaQQQaaa f6 c-1 Qm m m m m co co m W 03 CO C3 m CO m CO m CO CO CO m m 7- m ce m -1 C:1.4 W W W W W W W W W W W W W W W W W W W W W z 0 0 0 O 0 O 0 O , 0 0 0 O O O O 0 0 O 0 O 0 £ - O ' O 2 2 2 2 2 2 2 2 m 2 2 2 2 2 2 2 I 2 2 2 2 2 .1 0 0 0 0 0 0 0 0 In 0 0 0 0 0 0 0 0 0 0 0 0 0 CLI LC) ® 1- CL' W M CY CY W CrJ CC CY CC CY CY CY CY CY W CY CY CY CC O 1 t a a a a a LL a LL LL a a CL CL CL CL a LL a a LL a C m N O e- a V' in U) U) O a a U) N. CO CO M a CO U) CO h to) v M N M h N 0 h N 0 1n U) N M O N N r N 4- l� O O O O O O O O 0 0 0 0 C U K 0 0 0 0 0 0 0 0 0 o o 0 o 0 0 0 0 0 0 0 o o M E p > W 9 0 9 0 O O O O O O O O 0 0 0 0 0 0 0 0 0 •y O W tx o czo (.9 0 W m 0 3 m > > I.:- ,„0 c') 0 coo m o o n o � Li; to •, O > O LL W m LL v CO N N 0 >- ce 4 u_ LL N N L I- 0 0 0 0 0 0 0 U 0 0 0 U 0 0 U 0 0 0 0 0 U U �^1 A d `" M I\ L L 3 = w o ++ O Y LL) rn C O u O I= wF' rn 4) (0 a) zvi YE a) > aO+ �J w w o N v M a CO M O Q Q a rn Q CO CO 0 m m cc n/1 C - m U O `- O M N O O) O N N NO 0 0 N. N N. 0 (. N 7 a O z 2 Q m o o090 03 -) J Z Z [i [L N Cr) o U W o0 00 �_ ro ` H JD an Q_ Q O cr N E Z N (.6 N N z L G) c6 O CM a N a m I a a Q In c 4. it;s- a)v�VZ M u u a) c6 m flo co VY o) - a) a1 O O t L C a cc u..) Upp I > 0 r3 0 RS -wOO N W u > co +;O OaO ' Qc0 s ar t O �❑ V 4 m O IE Ii, '' a) O Y N C_c c (d Q E Y (.2 r r 7 7 C as > a) >+ T C C T C C >+ C C C C T C C C C C C E ,:-1-.Q. la fa 7 7 16 3 o to o 7 7 R 7 o A Ou -O O ). Fin , N N M e- .- N N ,- ,- , O M 7 e N N ' O 7 a) ''' (a 7 (a a) U c L Y . ap C co 0 O v a E - "' 0 Y a) o 0a) co Cl _o Y (a c p 0000000 IM ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ u co v 0 u J J J J J J J J J J J J J J J J J J J J J J N s U N 0 W W W W W W W W W W W W W W W W W W W W W W CC IL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL U. U. L.L. LL LL to N a) -C Ou JJ J J J J J J J J J J J J J J J J J J J J •Y a) > . 00 ' zzzzzzz2zzzzzzzzzzzzzz E c p `31 v,0 - v YO -0 RI IL LL LL LL LL U. LL LL LL LL lL U. LL LL LL LL U. LL LL LL U. LL _ Uc 0 v Ir :( @ T. IJ B `-- U a a) s Ou > 4) 0 = F o 1) W 'A t w w w W U m V H V a H V aiii ce c) De Ix m co coro bd 2 .6 m a J a w = 0 a = LLI a a a = a a a a a > > o Eff o v t0 r. > > v J w 0, W f Z a V Q' ce 0.' 2 N J J J J J J J J J J J J J J J J O O O O J J o 3 3 3 3 3 3 3 3 3 Www w v 2 2 E 2 v u -a Cero O 1 N T fx N O ro cF W a a a a a a a a a a a a a a a a a a a a a CO .--1cv 2mmmmmrn rnmZmmmmromrnmmmmmm •MOWS - W W . x a W W W W W W W W w W W W W W W W W W W W W W Z00000000 = 0000000000000 E CU L0 immix an r ❑ ❑ ❑ ❑ ❑ ❑ C1000000001:1000000 '0 .1 > > > > > > > > > > > > > > > O > > > > > ro C Ry ■ Q' re a' d' d' . d' d' J d' d' R' 0.' Q' d' d' 2 a' Q' d' d' C Q❑1 lei 0� -� 4, a a a a a a a s aaaaaaaaaaaaa C c t N 0 r' 7 7 It) O co O) 0 0 O r CO M co 7 co N co rvl- e', N M r N 0 r N 0 in O N /y 0 N N N. N 4.4 N. 7 7 \ O d. O O cocococoO coO 0 cop U 0 O O 0 O O 0 O O OO E p W O O O O O O O O O O O O O O O O O O O O O 'VI O 7 w K ❑ (D ❑ 0 CY 00 Cd -) n ❑ U CY ?j C� (0 O -/ -) O w fA •; p > p LL Cr m LL 7 m N N 'Cr O x 7 LL LL N N n� N V U V V U U U U U V U V U U V U U U U 0 U O V' G1 1-- rn e 3 i CC w C I I I 1 I 1 1 G O Q1 w m - a) f0 a) L - Y E v > co zLu a o D) O N a m a ❑ a 4- 0 O 7 co a 7 co a CO m ❑ _m CO co ` ,c �E Z . a 0 0 0 r)) r N . N N O 4- r O , e. N N a 3 m ,_ r- co m 4 4 J Z Z CL d u) ch O r- U W co 0o +. E a) A = E a O cc N £ Z 4J caa c a •�.0 ^ ill c R 0 CJ n v Z p vs _ a) m O CH a N a O1 r a a Q 6� 0 r In CL 0 0 0 ao U fn 0N Z OA ra _ ) 71 _Gc U > Y U co LU -' C Qv" x co Q t N N 0 dk2 Q- y N v O NO Y L CC qp w F- ,>,0.- M aj F- a0 8 c O v 0:.... co CO� @ a III' - II � u) y QJ O -C C C ro Y ► N N 0, MCI M ,r - > r- C co 4JQ a) G Q i C C C C C V O • Q d M 7 7 7 0 U Q1 co OU i-+ • fU N -) 7 N > -O f N N N N N 0) Co N ,_ 7 U '-' (6 7 L bc Cp c 10 0 O .-. A CI) E : 0 0 0 0 0 0 0 0 CC U CZ U 0 O J J J J J J J J J U a' a' W W W W W W W W W •`= U 00 • K W W LL LL LL LL LL LL LL LL LL N t O S F J J J J J J J J J ''' 4! > }' 0 c D D z z z z z z z z z v o 0 O N0_ Q1 + O -' - [C. LL LL LL LL LL LL LL LL LL C O C 41 > > C VC CD Q aJ t U > v 00 � g E-+ 0 a 0 G) H ›.- a) D lb 4) all U LJ •5 •5a w � a0 a M i1 W d N . LL LL H 0 N 0 N O FSI a; a Cn v> 2 O O W E 1- E .-' u, z z r' a cG0 H Z cn o M En Qtf m 0 0 w a a Y J co W D co o - O *4 v) v) W N m W a U r > > > J < 0 a � 1:1- p ao r 0 0 A' • o 0 ce cc cc 0 0 0 J 0 0 J 0 > W W W® 3 >>> >J>3 ,_ a m -4- '4 (13 , o — C > C'V CX Oa mob 11.1 cm, 8 INF- ~ m J m m m[� [� Z0 E m Eo, ILI —) 001' 00Q- 0000 aJ 0 o 0 0 Z 0 0 0 0 0 Q ra O v no I O O co a a a a a a II el CO o U s N V M M CN1 CV en g g 0 0 pp co co R CO C Y M M O 0 0 0 0 .- NO - r C < o CC 0 0 0 0 0 0 0 0 0 0 0 bA -� O 5 Ly < < C) 9 0 9 0 9 0 0 9 n > a a 0 Y Y O 2 d 7.. U 2 U U - m LU CA w IA 0 0 0 CO LL Z J O N > N N OC '-' 00000000 0 a) 0 1- C Cm M 7 Q I-- O a+ 0 m W Ln C 0. U W CD W 1_ Q) m a) CO O Cm I— v . E 4J •> O CO Z Q o m n m W U o Q M a N - ' co O m m r — .� U W W 1Q Z ~ m ~ J N M O N 3 a O y E 0.1 CC W = a W a c•Li T-a N > E z a O NVI CA 0 °° v in ^ U o ar 0 CD a N < O1 r a a m l 0 - O . ac) w W ..C9 T1 N Z N 6 v N WI X co N O CUD H - O ro Y F O Z a p F Q c o p O O Q. `ts c 6 ro Q a I I I II Y � f- s c c co FCU 7-- 2 IA N r r M M w -O Q_ > Z Q:' Q rc a Q 0 C C c c c tl O O O > ce 4 !CI)CI) u) M M M v > L — (0 Q) u Ili N N N N N N 07 W N - Y u +' (D C rroo O O bD O '. a) E 'O '^ C '-' O O c N Z �. 0 0 0 0 0 u m cu pp CP CC CC W W W W W W W W W cC --- l1 W W LL LL LL I.L. LL LL LL LL LL �p N t Ou x x J J J J J J J J J Y v > O O Z Z Z Z Z Z Z Z Z E O 4O 0 '' LL LL LL LL LL LL LL LL LL C O _0 C [ rp a) al v y= S'. C ' 0 i > > i Cu Q 0) t Ou > 74 .r 1, C, py a m a) F W O lb W N m v0 Z > a w ce a 0 0. w a1 N u) LL LL H V) m N • V Cu a.� o v) u) 2 O O w N 2 F 2 • V w Z Z F Q' Q' 0 F F Z u) F- as 0 to N oy AS, . Q N 0 ? d d W J = 2 ? 0 a p cc > > J < 0 k o 4z � 1 1 a CIO AP 4 W> J J O J O J O J J Q `; WooW3W3W33 W , , 5 2 E ca C �% vwi 40 T 0. N x N Oie Fe' _0 e w , Q Liu cp u) Q Z Q• icocococo o 0 c 1" W ZZwJZwOwwww m - , E2iQO oa0000 E a) " Y W , , oZ w Z Z m • -� CO toa ^: LL LL' ceE R ce a OCO O O a a a a Cl. a m 0 / L N N 0) O Cu M I- co N u -_ 4- M 0 0 0 0 0 .- NO C Q 1 U a. 0 0 0 0 0 0 0 0 0 0 0 oa Op > w Q Q O O O O O O O O O ✓ ix o YY O z a } w y 0 Q Q m LL Z J In N > N N 0 m ,~ ,- _- 0 0 0 U 0 U U U U y o m c w O� c c. /O m v w CD w a o Q rn pm U co ti w o m Q m V /d c AM U LU w ^ Z M OCsi - r up 0 � L. ,--i 'a Z_ Q -1 d t 1 °r N > LL °O O °r N Eea a) y cc N te) = Q r W N r O CU ra L C a l7 zO N ..,`••, d v0i z V1 Q •F.o ca- � � zo I e c v a p C/3 a N a J it a` a m PI 2..(3 .1150 Regg, James B (DOA) From: Green, Darrell [Darrell.Green@bp.com] Sent: Tuesday, June 17, 2014 6:47 AM To: DOA AOGCC Prudhoe Bay Cc: Mammadov, Famil; AK, D&C Rig 272 Well Site Leader; Allen, Kenneth W; Bjork, David; Burnett, Richard D; Cismoski, Doug A; Daniel, Ryan; Endacott, Mary S; Green, Darrell; Isaacson, William S; Kavanagh, Tom; Kilfoyle, Jeffery A; Kolstad, Scott R; Madsen, Alan D; Mattson, Greg; McMullen, John C; Newlon, David B; Rall, John R; Sarber, Greg J; Schneider, Kenneth J; Willingham, James M Subject: BOP Usage Form 6-16-14 Attachments: AOGCC BOPE USAGE REPORT FORM 6-16-14.docx Please see the BOP usage report attachment for any comments or concerns please contact me at the information listed below. Kind Regards! Darrell W. Green GPB Rotary Field Superintendent BP Alaska Drilling& Wells 907-659-4618(North Slope Office) 907-229-2879(Cell) 2156-Harmony Radio • ><((((°>'• ><((((°> • , . • ..><((((°>'• • .><((((°> 1 AOGCC BOPE USAGE REPORT FORM (Well Control event only) Field Superintendent Name: Wellsite Leader Name: Darrell Green Chris Weaver/Bret Anderson Contact Number: 907-659-4618 Contact Number: 907-659-8379 BP Traction Number: 2014-IR4743455 Rig Name &Well Pad or Drill Site &Well Name: Parker 272/ DS 18-11B Permit To Drill (PTD) Number: 213-195 - Date and Time of Incident:07:50 06/16/2014 Original Scope of Work: Re-Drill development well 18-11. Drill 6 1/8" pilot hole, sidetrack and drill production interval to a measured depth +/- 19,400 feet. Operational Description Leading up to Well Control Event: Tripping in the hole to the 7" shoe @ 13,420', while circulating bottoms up, flow check well bore and observed gas .� breaking out in bell nipple. BOPE Used and Reason: Annular Preventer/ Observed gas breaking out in the bell nipple/ LEL readings with gas detector Current BOPE test time/date Last Full BOPE Test: 6/15/2014 Is a BOPE re-test required after use: Yes/No and reason Yes, Annular shut in for Well Control must be re-tested. BOPE Retest time/date and result (WSL to complete as applicable) The annular and choke valve#7 will tested when drill string is out of the well bore. -- Hours. Plan Forward: Drill 6 1/8" production hole/ POH for BOP Test Additional Comments: ACTIONS REQUIRED: 1) Well Site Leader:Timely email notification of BOPE re-test time estimate to AOGCC North Slope Inspectors is required following any WC incident to allow the State to witness re-test as required. 2) Superintendents: Email the completed BOPE Usage Report form to AOGCC North Slope Inspectors within 24 hours of a WC incident: doa.aogcc.prudhoe.bay@alaska.gov 3) Well Site Leader: Complete AOGCC BOPE Test report form 10-424 and send to three AOGCC addresses (noted in form) within 5 days following the test/retest. This is applicable to Well Control events Only. Plitt PS- I(g PO Z-l 3(%-U Regg, James B (DOA) From: Green, Darrell [Darrell.Green@bp.com] Sent: Saturday, June 14, 2014 7:32 AM To: DOA AOGCC Prudhoe Bay Cc: Mammadov, Famil; AK, D&C Rig 272 Well Site Leader; Allen, Kenneth W; Bjork, David; Burnett, Richard D; Cismoski, Doug A; Daniel, Ryan; Endacott, Mary S; Green, Darrell; Isaacson, William S; Kavanagh, Tom; Kilfoyle, Jeffery A; Kolstad, Scott R; Madsen, Alan D; Mattson, Greg; McMullen, John C; Newlon, David B; Rall, John R; Sarber, Greg J; Schneider, Kenneth J; Willingham, James M Subject: BOP Usage Form 6-13-14 Attachments: AOGCC BOPE USAGE REPORT FORM 6-13-14.docx Gentleman; Please review the attached BOP Usage Form 6-13-14 for Parker 272 on DS-18 for any questions or comments please contact me at the information listed below. Kind Regards! Darrell W. Green GPB Rotary Field Superintendent BP Alaska Drilling& Wells 907-659-4618(North Slope Office) 907-229-2879(Cell) 2156-Harmony Radio • ><cc ° , ><((((°> •-•. , • • ><U((°> '• „ - ><acc°> 1 _' AOGCC BOPE USAGE REPORT FORM (Well Control event only) Field Superintendent Name: Wellsite Leader Name: Darrell Green Chris Weaver/Bret Anderson Contact Number: 907-659-4618 Contact Number: 907-659-8379 BP Traction Number: 2014-IR4741808 ,- Rig Rig Name &Well Pad or Drill Site &Well Name: Parker 272/ DS 18-11B Permit To Drill (PTD) Number: 213-195 Date and Time of Incident: 12:00 06/13/2014 ' Original Scope of Work: Re-Drill development well 18-11. Drill 6 1/8" pilot hole, sidetrack and drill production interval to a measured depth+/- - 19,400 feet. Operational Description Leading up to Well Control Event: Pulling out of the hole for BOP test and bit change,flow check well bore and observed gas breaking out in bell nipple. BOPE Used and Reason: Annular Preventer% Observed gas breaking out in the bell nipple/ LEL readings with gas detector Current BOPE test time/date Last Full BOPE Test: 6/14/2014 Is a BOPE re-test required after use: Yes/No and reason Yes, Annular shut in for Well Control must be re-tested. BOPE Retest time/date and result (WSL to complete as applicable) A complete BOP Test will be performed when drill string is out of the well bore.Test notification sent 6/12/2014 at 18:49 Hours. Plan Forward: Monitor well/ POH for BOP Test and BHA change Additional Comments: ACTIONS REQUIRED: 1) Well Site Leader:Timely email notification of BOPE re-test time estimate to AOGCC North Slope Inspectors is required following any WC incident to allow the State to witness re-test as required. 2) Superintendents: Email the completed BOPE Usage Report form to AOGCC North Slope Inspectors within 24 hours of a WC incident: doa.aogcc.prudhoe.bay@alaska.gov 3) Well Site Leader: Complete AOGCC BOPE Test report form 10-424 and send to three AOGCC addresses (noted in form) within 5 days following the test/retest. This is applicable to Well Control events Only. „4�,w\,\ I//7' �� HE STATE A i^ck? (a:°1 a ,6 F, r / / 333 west Severth Avenue Gov1,RNOR ` F,\N P.\RNl i I Anchorage, A!aska 995n'-3572 �l`'Luuu Mary Endacott Engineering Team Leader a(t 3- 1 Jam' BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 18-11B Sundry Number: 314-230 Dear Ms. Endacott: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. f� Commissioner DATED this Jo day of April, 2014. Encl. STATE OF ALASKA �Q�' � ALASKA OIL AND GAS CONSERVATION COMMISoiON �\1��� E C E V E 0 APPLICATION FOR SUNDRY APPROVAL k' 11 2014 20 AAC 25.280 1. Type of Request: •AOGCc ❑Abandon 0 Plug for Redrill ❑Perforate New Pool 0 Repair Well ®Change Approved Program • ❑Suspend 0 Plug Perforations ❑Perforate 0 Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. \ 213-195 - 3. Address: ❑Exploratory El Stratigraphic e,Alaska 99519-6612 ®Development CI Service 6. API Number: P.O. Box 196612,Anchorage, 50-029-21181-02-00 7. If perforating: 8 Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU 18-11 B • Will planned perforations require a Spacing Exception? ❑Yes o 9. Property Designatior. , 10. Field/Pool(s): \ ADL 028321, 028302&028307 Prudhoe Bay/Prudhoe Bay • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft). Effective Depth TVD(ft): Plugs(measured): Junk(measured) 12751' 8905' 12718' 8895' 10651', 10672' None Casing Length Size MD ND Burst Collapse Structural Conductor 110' 20" 110' 110' 1490 470 Surface 2500' 13-3/8" 2500' 2500' 4930 2670 Intermediate 11062' 9-5/8" 11062' 8437' 6870 4760 Production Liner 607' 7" 10763'-11370' 8233'-8638' 8160 7020 Liner 2077' 2-3/8" 10672'-12749' 8170'-8904' 11200 11780 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 12530'- 12695' 8823'-8888' 5-1/2"x 3-1/2", 9.3# L-80 10804' Packers and SSSV Type: 9-5/8"x 3-1/2"Baker DB Permanent Packer Packers and SSSV 10700'/8189' MD(ft)and ND(ft): 12. Attachments: 13.Well Class after proposed work. ®Description Summary of Proposal ®BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic IS Development 0 Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation April 17,2014 • ®Oil 0 WINJ 0 WDSPL 0 Plugged 16 Verbal Approval: Date 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative: ❑WAG 0 SPLUG 0 Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Printed Name: Mary Endacott Title: Engineering Team Leader Email. Famil.Mammadov@bp.com Signature: tj, , FfiOr,(7,(41 Phone: 564-4388 Date: VI 0/14 Commission Use Only / Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Z\l–l– 230 ❑Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance Q Other: ,78DM AY 0 7 2014 Spacing Exception Required? 0 Yes12No Subsequent Form Required: _ 4 /i / 61— Approved By ‘ i ` / COMMISSIONER THE COMMISSION DateAPPROVED BY : ,' f/I Form 10-403 R-ised 10ppV�/2012/ A rev r r l4o[12 months from the date of approval Submit In Duplicate ULF1//5 /` � V1L /�/ //� i.� /`f/ 1 To: Alaska Oil &Gas Conservation Commission From: Famil Mammadov bID Drilling Engineer 0 Date: December 12, 2013 Re: 18-11B Permit to Drill Well History: This well was originally completed in 1984. It was then worked over in 1990. The well sidetracked by a coiled tubing rig in 11/2009. The well produced for 7 months before the water production increased from < 100bwpd to 3000bwpd in July 2010. It was confirmed that the water was from the Cretaceous formation. Reason for sidetrack: 18-11A is a non-operable well due to production casing and tubing leaks. A rig workover of the current well would be very risky due to scaling caused by crossflow of the Cretaceous with the Ivishak. ✓ Therefore, this well is not operable and has no remaining value. Diagnostics logs (SCMT and Gravel Pack RST) were run to determine if any fill was present below the production casing leak. Both logs indicated solids accumulation over the interval between 10,162'— 10,436' MD. Sidetrack Plan: The existing 18-11A wellbore will be abandoned with a lateral cement plug set above the reservoir. The new wellbore will be mechanically isolated from 18-11A by an EZSV plug at—2700'. Casing whipstock will be set over EZSV and sidetrack will be performed out of 9-5/8" cased hole. An 8 1/2' intermediate hole is proposed to be drilled to the top of Sag River to be then cased with a 7" 26# L-80 string to surface. A 6 1/8" hole will then be drilled from the bottom of the 7" targeting Ivishak formation. The production section is to be completed with 4 '/2' liner systems with top of cement planned to top of liner depth. The well will be perforated across Ivishak Zone 1A . and tied to surface with 4-1/2" tubing string. MAASP: 3015 psi—Ivishak 21TS Pre-Rig Work: (scheduled to begin January 15, 2014) 1. Perform diagnostics to determine if any solid accumulation present around the tubing under the production leak. Determine the free point(completed) 2. Pull the liner top test plug and replace it with a permanent mechanical plug 3. Drift for Jet Cut 4. Jet cut tubing above the free point. Proposed cut depth at— 10,000' 5. MIT-OA to 2,500 psi 6. PPPOT-T and IC. Function LDS. 7. Set BPV and test 8. Install dry-hole tree Rig Work: (scheduled to begin on April 1, 2014) 1. MIRU Parker 272 and test BOPE 2. Pull and L/D 3.5" 9.3# L-80 Tubing from —10,000 ft MD including control lines from the chemical mandrel 3. PU 8-1/2"clean-out assembly and RIH to clean-out 9-5/8" casing to top tubing stub at—10,000' MD for the first stage and 2141' MD for second stage). 5. Perform P&A operations depending on the extent of TOC behind 9-5/8" • BP policy requires at least 100 ft ND of annular cement isolation between Put River / Sag River / Ivishak and CM3 shale. • Fullbore P&A cement plug (min 650ft ND)will be placed above the tubing stub 5/8" casing is confirmed. i. Place an EZSV plug at—9,900'MD and perform weight test ii. Pump cased hole cement plug (min 100' ND of lateral plug shall be provided). Base plan is an equivalent of 1,050' of cement volume. 6. Run a packer to be able to pressure test cement having isolated the PC leak(@7,100' MD) 7. RU E-line, RIH with GR/CCL and 9-5/8" EZSV for 47#casing. Set the EZSV at—2700' MD (competent formation/confirm with GR) as required to avoid cutting a casing collar while milling the window. POOH. Rig down E-line. 8. Pressure test the EZSV to 3500 psi for 30 minutes and chart. log. POOH, L/D assembly. 10. Change out to 9 %" rams, and test rams-to 240-psi low/3500 psi high. • 5 • 5 12. Change out to 2 7/8"x 5 1/2"VBR Rams. Test to 250 psi low/3500 psi high. _ _ 3 • 5 14. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Shear off the whipstock. 15. Hang off from RTTS, pressure test and ND BOPE. 16. Remove tubing spool and replace 9-5/8" casing pack-offs J 17. Mill window, drill 20-50ft of new formation, perform LOT 18. MU 8-1/2" intermediate hole BHA(GR/RES/PWD) and Drill to TD in the TSGR. Short trip. RIH to TD. POOH lay down drilling assembly. 19. Change out to 7"casing rams and test to 250 psi low/3500 psi high. 20. RU, run and cement 7" casing string. Test casing to 250 psi low/3500 psi high 21. MU 6-1/8" production hole BHA(GR/RES/Neu/Den)and drill pilot production hole to— 14,401' MD 22. Perform open hole sidetrack and continue drilling to TD 23. RU and run 4-1/2" production liner and cement in place. Test liner to 250 psi low/3500 psi high 24. MU and RIH with perforation guns and perforate the 4-1/2" liner. 25. RU and Run 4-1/2"completion, drop ball and rod and set packer, test tubing and IA to 250 psi low/3500 psi high. 26. Shear GLM, freeze protect well circulate corrosion inhibitor, 27. Install TWC test to 250 psi low/3500 psi high. ND BOP 28. RDMO. Post-Rig Work: 1. Install tree 2. MI/RU slick line. Pull the BPV. 3. Re-install wellhouse and FL's. 4. Generic GLV's Famil Mammadov Drilling Engineer Office: 907-564-4135 Cell: 907-306-7739 Email: famil.mammadov@bp.com Attachments: Rig BOP Schematic Current Well Schematic Pre-Rig Well Schematic Proposed Well Schematic 18-11B Drilling Hazards and Contingencies Directional Plan CC: Well File Joe Lastufka Planned Well Summary Well 18-11B Type Producer Objecet tive Ivishak API Number: 500292118101 Current Status Shut-In Estimated Start Date: 04/01/14 Time to Complete: 63 days Surface Northing Easting Offsets TRS Location 5,960,602 692,199 1277' FNL 431' FWL T11N R15E S19 TSAG Northing Easting TVDss Offsets TRS 5,968,358 688,341 -8,113' 1294 FSL 2052 FWL T11N R14E S12 Production Northing Easting TVDss Offsets TRS Hole Target Location 5,969,198 682,890 -8,580' 2268 FSL 1904FWL T11N R14E S11 Planned KOP: 2,654' MD/-2,589.5' TVDSS Planned TD: 19,405.2' MD/-8,580' TVDSS Rig: Parker 272 BF/RT: 17.4'/46.95' RTE: 64.35' Directional — Baker PB1_WP03 (Pilot Hole)/ Plan #10 KOP: 2654' MD Maximum Hole Angle: — 74° in the 8-1/2" intermediate section — 97° in the 6-1/8" production section Close Approach Wells: L2-07A, L2 21A, 18 26B Survey Program: Sonny Tool;Error Hale Com= DRV Intervall*1 Common Corkpreurr model Sae Sae frons to GCTMS 1"'. 9 .3 58 .2654 14eerY I"I}.Cauy StompnILQ. 7irTrP6nl Y 2654.050 MD triode UNKO m6 as BHA GYD-GC-SS 312- T 2675 3100 1263a gyro single snot mems tend free of Magnetic mevFesem Apply 519.D.IFR SAG commons. MRD-IFR S1 T 3100 3300 Do tet&Alps;33000 SID mann pig Muln-Stnion Mlle* MWD-IFR-MS 8 l:2- 3300 13410 Apply MRD.DM SAG conecnno. Apply MIRD.IFR SAGS MWD-IFR 4 12- 61 8" 13440 13115 Apply MdY-Stam•Analysis w9eecan possible. MWDHFR-41S 41:2 6 LT 2675 13890 Parent Inflow(23-113 MOIL, Toe-lc-Poen Y 133900111D. MWD-431V-MS 412 61:8` 13890 14325 ApptyMRD.ISR SAGcmecaons. li lik naming he hole..54 ane BS4.joke 3 sen of loth=Geek sMls!ll Se'W surveys/ 7o mak 3fohi-Sotioa"loohhsis rwreraeo is saeren iv ekefi....W ser* 41 6 LT 14525 19405 Apply MWD.DFR SAG commons. Nearest Property Line: 22,500' (N) Nearest Well within Pool: 2,400' (L2-07A) Formation Tops & Pore Pressure Estimate (SOR) Estimated Minimum Most Likely Maximum Depth Fluid Formation Formation Top Pore Pressure Pore Pressure Pore Pressure Uncertainty Type (TVDss) (EMW ppg) (EMW ppg) (EMW ppg) (+/-TVD ft) (for sands) Surface 1 8.4 8.4 8.4 Behind Ape brine G1 500 8.4 8.4 8.4 Behind Ape brine SV6 1,518 8.4 8.4 8.4 Behind Ape brine BPRF 1,853 8.4 8.4 8.4 Behind Ape brine 2,650 8.4 8.4 8.5 Behind Ape brine SV5 2,954 8.4 8.4 8.5 20' brine SV4 3,138 8.4 8.4 8.5 20' brine SV3 3,625 8.4 8.4 8.5 20' brine SV2 3,800 8.4 8.4 8.5 20' brine SV1 4,205 8.4 8.4 8.5 20' brine UG4 4,724 8.4 8.4 9.7 20' brine UG3 4,925 8.7 9.3 9.7 20' brine UG1 5.464 8.7 10.5 20' brine WS2 6,026 8.7 9.3 9.4 20' brine WS1 6,242 8.7 9.3 9.4 20' brine CM3 6,460 9.4 9.6 10.0 20' brine CM2 7,007 9.6 10.1 10.9 20' brine CM1 7,484 9.6 10.2 10.9 20' brine THRZ 7,853 9.6 10.2 10.6 20' brine BHRZ/T PTR 7,984 7.6 8.1 10.6 20' gas BPTR/LCU 8,039 7.6 8.1 10.3 20' gas TKNG 8,040 9.6 10.2 10.3 20' brine TSGR 8,113 7.5 7.9 8.0 20' gas TSHU 8,177 7.5 7.9 9.1 20' gas TSAD 8,219 7.4 7.9 7.9 20' gas TCGL 8,297 7.4 7.9 7.9 20' gas BCGL 8,364 7.4 7.8 8.6 20' gas 23SB 8,419 7.4 7.8 8.6 20' gas 22TS 8,454 7.4 7.8 8.6 20' gas 21TS 8,482 7.4 7.8 8.8 20' gas TZ1B 8,576 7.2 7.7 7.9 20' gas TDF 8,612 7.2 7.6 7.9 20' oil/gas BSAD 8,640 7.2 7.6 7.9 20' oil Kavik 8,690 7.2 7.6 10.0 20' oil Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn. Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD/TVDrkb MD/TVDBRT 8-W 7" 26# L-80 VarnTop 7,240 5,410 10940 2500 13,440' /8,178' HC 6-1/8" 4 W 12.6# 13Cr-80 Vam Top 8,430 7,500 6205' 13280'/8048' 19405' /8644' (-200' lap) Tubing 4 %" 12.6# 13Cr-80 Vam Top 8,430 7,500 13153' surface 13280'/8048' Mud Program Intermediate Section Mud properties for 8 1/2" hole section: Depth Safe Operating Envelope Weight upAPI fl. MD Mud Weight(ppg) Method PV YP LSYP Loss HTHP MBT pH LGS Feet Min* Preferred°° Max cP Ib/100ft2 Ib/100ft2 ml/30 min lb/bbl KOP— 9.8 10.2 10.3 LMP 10-15 18-25 5-7 <6 NA <20 8.5-9.5 <6 7,000' 7,000'- Spike 11,000' 10.2 10.2 10.3 Fluid/ 10-15 18-25 5-7 <6 NA <20 8.5-9.5 <6 Barite 11,000'- Spike 13,402' 10.5 10.6 10.8 Fluid/ 10-15 18-25 5-7 <6 NA <20 8.5-9.5 <6 (TD) Barite Production Section Mud properties for 6 1/8" hole section: Depth Mud weight PV YP API Fl. Low Shear pH MBT _ (lb/gal) Loss Rate Visc. MD (ft) Min Preferred Max cP Ib/100ft1 m1/30 min cP 13402-19405 8.4 8.4-8.7 9.0 <12 10-25 <12 >15000 8.0- <4 9.5 Logging Program 8-1/2" Intermediate: Sample Catchers—as required by Geology Drilling: Dir/GR/ Res Open Hole: None Cased Hole: USIT -contingency 6-1/8" Production: Sample Catchers-as required by Geology Drilling: Dir/GR/ Res / Neu I Den Open Hole: None Cased Hole: None Cement Program Casing Size 7" 26#, L-80 Vam Top HC Intermediate Liner Basis: Lead: None Tail: 1500' of annular length + 30% excess + 80' shoe track. Tail TOC at—119 0' MD Total Cement Spacer 30 bbls of Viscosified Spacer Volume: Lead N/A Tail 46.6 bbls, 261 cuft, 226 sks 15.8 lb/gal Class G + adds— 1.16 cuft/sk Temp BHST= 176° F, BHCT TBD by Schlumberger Casing Size 4.5" 12.6#, 13-Cr-80 Vam Top Production Liner Basis: Lead: None Tail: Open hole volume + 40% excess + 150' of liner lap + 120' shoetrack Tail TOC: 13200' MD (cement at TOL w/excess to be circulated out) Total Cement Spacer 25 bbls of Viscosified Spacer weighted (Mud Push II) Volume: Lead N/A Tail 139.9 bbls, 788 cuft, 673 sks 15.8 lb/gal Class G + adds— 1.17 cuft/sk Temp BHST= 185° F, BHCT TBD by Schlumberger Surface and Anti-Collision Issues Surface Shut-in Wells: L2-07A. L2 21A, 18 26B wells shall be shut down while drilling the intermediate hole section. 18 21B well house will be under mud module and may have to be shut down during rig operations (per BP policy) Close Approach Shut-in Wells: L2-07A. L2 21A, 18 26B wells do not pass major collision criteria Hydrogen Sulfide DS-18 is not an H2S pad. Well Name H2S Level Reading Date Comments Parent Well(if sidetrack) 18-11A 16 ppm 3/25/2010 #1 Closest SHL Well H2S Level 18-21A 20 ppm 3/12/2011 #2 Closest SHL Well H2S Level 18-20 5 ppm 7/5/1996 #1 Closest BHL Well H2S Level 15 07C 20 ppm 3/15/2013 #2 Closest BHL Well H2S Level L2-07A 20 ppm 9/15/2012 #3 Closest BHL Well H2S Level K-10C 30 ppm 5/30/2013 flax. Recorded H2S on Pad/Facility 18-30A 28 ppm 1/1/2011 Other Relevant H2S Data (H2S alarms from rigs,etc.) Faults 18-11B will not cross any mapped faults Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal / Contact the GPB Environmental Advisors (659- 5893) f/guidance. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear ram, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for 18-11B will be 7 to 14 days during drilling phase and 7 days during de-completion and surface casing work. Intermediate Interval Maximum anticipated BHP 4422 psi @ 8039' TVDSS (10.58 ppg EMW) Maximum surface pressure 2061 psi (.10 psi/ft gas gradient to surface assuming fracture gradient at the shoe + 2 ppg safety factor) Kick tolerance 11 bbls for Sand FG 40 bbls for Shale FG Planned BOP test pressure Rams test to 3500 psi/250 psi. Annular test to 3500 psi/250 psi 13-3/8" Casing 2500 psi surface pressure 9-5/8" Casing Test/7" 3500 psi surface pressure • Casing Integrity Test—8-1/2" hole FIT after drilling 20' from middle of window 7" Casing VBRs upper cavity will be changed to 7" rams for the 7" liner Production Interval Maximum anticipated BHP 3863 psi @ 8482' TVDss (8.76 ppg EMW) Maximum surface pressure 3015 psi (.10 psi/ft gas gradient to surface) Kick tolerance Infinite with 8.7 ppg MW at min predicted fracture gradient of 12.74 ppg Planned BOP test pressure Rams test to 3500 psi/250 psi. Annular test to 3500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20' of new hole 4-1/2" Production Liner 3500 psi surface pressure Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel 18-11B Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. Intermediate Hole - The section has been split in 3 sections. Normally pressured formations will be drilled with lower mud weight that will provide sufficient overbalance. Mud density will be raised prior drilling into potentially overpressure Cretacious formations. The third section of the well will require the highest mud weight to overbalance Put River formation as well keep Kingak shale formation stable. B. Production Hole - The Sag River and Ivishak formations in this area are expected to be under-pressured at 7.5-8.0 ppg EMW. This interval will be drilled with —8.5-8.9 ppg reservoir drill-in fluid. II. Lost Circulation/Breathing A. Intermediate Hole — lost circulation is moderate. Lowest possible ECD will be used for preventing losses as well as good drilling practices (short trips, rotation, etc.). Breathing risk is high and any uncertainty shall be treated as per well control procedures. B. Production Hole—the risk of lost circulation in this hole section is low. III. Kick Tolerance/Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is expected to be in the range of 11-40 bbls. B. Infinite kick tolerance for production hole section with planned mud weights and predicted fracture gradient at the shoe C. Integrity Testing Test Point Test Depth Test type EMW(Ib/gal) 9-%" window 20'-50' from the 9-%" window LOT 11.1 minimum 7" shoe 20'-50' from the 7" shoe FIT 9.8 minimum IV. Hydrogen Sulfide DS-18 is not an H2S site. V. Faults 18-11B well will not intersect any mapped faults. There may be some small, poorly defined D to S faults in the lower Colville (CM1), at about 12,800 MD. VI. Anti-Collision Issues Following wells do not pass major risk criteria L2-07A. t_2 21A, 18 26B CONSULT THE DS-18 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION . . Parker 272 BOPE Schematic PARKER 272 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-SMir1 13 5/8"-5M STUDDED TOP _r3,_ ,',. 13 5/8"-5M FLANGED BOTTOM W/(2) 14" UL2 OPERATOR, UPPER CAVITY ° ANNULAR BOP: SHAFFR AND (2) 14" PSLK W/BSTR OPERATOR, -ra.•..•..•..•.i•. al •14rf 13-5/ " LXT 13 5/8"-5M �� LOWER CAVITY 13-5/8" 5M STUDDED TOP o 13-5/8" 5M FLANGED BOTTOM 0 I I DRILLING CROSS: 13 5/8"-5M FLANGED TOP C10 t 13 5/8"-5M FLANGED BOTTOM • I• 4471"\>. Q ,,`a 3 W(2) 3 1/8"-5M SIDE OUTLETS 17 mo • i�■ moiE �I� •• � •:it 1 1 KILL UNE: f "RAI filAt"(12%_ 2-1/16" SM FLEX HOSE X00 • r� •r • �I = — .r r;c 2-1/16" SM X 3-1/8" 5M D.S.A. ��' ,��/� 3-1/8" 5M FLANGED MANUAL GATE VALVE MMEM O3-1/8" 5M FLANGED HYDRAUUC GATE VALVE E r�►'r --W 21 ,'b FF 3 E• ��1-y I • I 1 I CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE — SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 8" 5M FLEX HOSE 13 5/8"- 5M FLANGED BOTTOM 3-1/8" w/(2) 14" UL2 OPERATOR TREE= . IkEVOY GEN 3 S TY NO TES: WELL ANGLE>70°@ 12673'. yveLLHEAD= Me EVOY 18-11A 18-11A CTD DEPTHS ARE ELMD. ACTUATOR= A XELSON OR1G KB.EL& 55' I OM BF Ei_EI ' 1 43' -15-1/2"X 3-1/7 XO,ID=2.992" V -'? ' OR1G KOP= 3150' r2-0. 1 coNDUCTOR H ? Max Angle= 89°©12245' Datumt4A3= 12609' C:to 2187' -3-1/2'OTIS FMX TRSV,13=2.813 Datum WO ' 8800'SS LOCKED OUT TRSV OFt$1(03/06/14) 1 13-3/8'CSG,72#,L-80 BTC,ID=12,347" - 2500' -4 k GAS LIFT MAIL/EELS Minimum ID = 1.75" @ 10672' STAID ND DEV TYPE VLV LATCH PORT DATE 1 "3230 3226 13'.1 WIG DM' RK 0 07/22/10 35 KB LINER TOP PACKER E E 2 7056 5850 54 WAG DVIY RK 0 05/31/12 3 9555 7430 50 144./G MY RK 0 06/12./12 FC&TBG LEAKS(CONFIRMED 07/22/10) * -7100 / 3-1/2"JET CLJT TBG(03/01/14) H 10021' — 1 01 62'-10436' ---IFLL(EL RST GRAVEL LOG 10/14/13) CHE3AICAL MANDRELS ST MD ND DEV 1YPE VLV LATCH PORT DATE 4 10582 8108 47 KBUGLTS Cl-EM BK 3/16 )1/20/90 3-1/2"HES CUP(03(02/14) 410i5n 10672' -[35 KB LIP w/SEAL STEM,D=1.75"(11/17/09) i 1 _.......... _ _ a 7.- — 10672' --i PERM NENE PLUG I 1 Z II.... 10700'1-r-9-5M'X 3-1/2"BKR C6 PERM PKR,ID=? i 10710' -3-1I2'DEPLOY SLV,10=1.875' TOP OF CMT SHEATH/COLLAR. --1., 10703 j 11,, "t OCISf MILLED TO 2.8'(08/25/09) 4 - TOP OF 7"UNR - 10776' ..,.' ',,... JO ju'.4' ti4 10791. 1-13-11r 0115 XN NO-GO NIP, .4 NI $s1 MILLED TO 2.80'(08/25/09) 3-1/2'IBG-PC,9.3#,L-80,.0087 bpf,132.992 - 10803' tt.2 10803' -3-1/2^WLEG Cm i'D BEHIND PIPE .N 10799' -ELM)TT LOGGED 03/08/91 9-5/8"CSG,47#,L-80 NSCC/BTC,0=8.681" - Y'. 11062' ."'. .' I ,..... '.‘""4... MILLOLIF VV1NDOW(18-11A)11370'-11375' 7"LNR,29#,L-80..0383 bpf,ID=8.276" --1 -11370 FERFORATION SUMMARY REF LOG:NIDNL/SCWIT 11/06./09 ANGLE AT TOP PERE-67'@ 12530' Nbte:Refer to Production Ce for historical perf data SIZE' SIT- INTERVAL Opn/Sqz SHOT SQZ 1.56' 6 12530-12590 0 11/06109 1.56' 6 12650-12695 0 11/06/09 PBTD H 12718" 2-3/8'LNR,4.7#,L-80, 0039bpf,ID=1.92" --I 12749' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 09/17/84 RWN 41 IMTIAL COM PLETION 12/06/13 FM'PJC PC LEAK/FILL CORRECTX3N WELL: 18-11A 09/26/90 AUCI 4 RHO 03/10/14 J0WJMD MG CUT/SET CUP(03/01-02/14) PEWIT No: 2090740 11/07/09 NORDIC1 CTD SIDETRACK(18-11A) 03/10/14 TBD/JM) LOCKED OUT IRSV(03/06/14) API ND: 50-029-21181-01 06/15/12 ANY PJC GLV CO's(06/8-12)12) SEC 19,T11N,R15E,1278'Ft&&431'FWL 06/16/12 RIC CEIBA IRI C/O(11/020) .. 06/19/13 PJC 'LNR/CSG CORRE - CTION i BP Exploration(Alaska) _ - 1 1 • • Pre-rig Schematic: TREE htEVOY Gala SAFETY NOTES: WELL ANGLE>70"SJ 12673'. WELLHEAD= IkEVOY / fl 4 A A 18-11A CTD DEPTHS ARE ELMD. B EP Axa 5' PRE RIG ORIG BF R_ty 7 I I 43' 5-1/2'X 3-1/2'XD,ID=2.992" OPoG KOP= 3150' 120-CONDUCTOR H ? Mix Angle= 89' a 12245' Datum MD- 12609' 2187' 1 13 1/2'0T13 FMK 1113' ,1D-2 813' I Cetum NO= 8800'SS K. MI 113-3/8"CSG,72k,L-80 BTC,ID.12.347" I—I 2600' - —.—_._--- GAS LFT MANTx1t3S Minimum ID=1.75" C/ 10672' ST 181 TVD DEVTYPE VLV LATCH R)RJ' DATE 35 KB LINER TOP PACKER 1 3230 3226 13 MIAG OMI' RK 0 07/22/10 $ . 2 7056 5850 54 MNG MY RK 0 05/31112, [PC 8 TBG LEAKS(CONFIRMED 67122110) 7100 3 9555 7430 50 RANG DMt' RK 0 06/12/121 L -10000 I-3-1/2'TUBING CUT(X)UXX/XX) 0 10162'-1043C-141 1(E-RST GRAVEL,LOG 10/14/13)1 CIt MCAL MANDRELS ST` 10 1VD DEV t TYPE VLV LATCH FORT RA TF 4 ®I 4 10582 8108 47 I KBtK2 IS (34A BK 3/16•1100/90 10672' IH35 KB LIP w/SEAL STEM,ID=135"(11/17/09) ►= : ', 10672' HPERMANE�rr PLUG _7_,1 ►C 10706' H9-5/8'X 3.1/2"BKR DB PH84 PKR,D=? TOP OF CMT SHEATH/COLLAR --.110703' ,r 10710' �—3-1(2'DEPLOY SLV.ID=1.875" Ms t Fn TO 2 6'(08/25.03) 'lega, -. P. .,�t ,/ TOP OF 7_LNR 1 07 76' 1 J. 4 PR Jx ti aA 10791' I-3-1/2'0115 XN NO-GO NIP. �1. ,k MULE)102 80'408/25/09)RS F3-U2'TBfrPC,9.34,L-80,.0087 bpf,D=2.992" -I-J`-10803'� A4 10803' I-13-1/2'WLEG-CM 1'D Ill 118.10 PIPE 61 10799' Hlih(DTTLOGGED 03/08/91 9-5/8'CSG,474,L-80 NSC(7BTC,D=8.881' - 11062' —• 'Si l ik Og 1.1L LOUT WINDOW(18-11A)11370-11375' 7"LNR,29k,1-80, 0383 bpf,ID-6.276' H -11370 1 PERFORATION SUMMARY REF LOG:Mct.IJSCMT 11/08/09 ANGLE AT TOP PERE:67•@ 12530' late.Refer to Production DB for historical pert dat_ SIZE SPF INTERVAL Opn/Sgz DATE 1 56' 6 12530-12590 0 11/06/09 1.58' 6 12650-12695 0 11/08/09 1-1--- 12718' 2-3/8"LER,4.74,L-80,.0039bpf,D=1 92" f--j 12749' DATE REV BY I CDMENTS DATE ?REV BY COMIENTS PRIAHDE BAY UNIT 09/17/84 18NN 41 #INTIAL COMPLETION 06/15/12,AM PJC GLV CIO's(06/8.12/12) WELL 18-11A 09/26/90 AUDI 4 '18NO 06/16/12 f PJC (2-FM NU GO(11/02/90) MMT No- 2090740 11/07189 NOIDC1 ICTO SIDETRACK(18-11A1 06/19/13 PJC LNR/CSG CORRECTION AP1 hia 50-029-21181-01 06105/12 BES/JAD;GLV GO(05/31/12) 12/06/13 i FAN PJC PC LEAK/FLL CORRECTION SEC 19,T11 N,R15F 1278'FTI 8.431'FWL 06/05/12 GJF/JMDLTP w/SEAL STEM(11/17/09) 06/15/12 PJC ILTP8 LTTPODRT1O8E 11 I BP Exploration(Alaska) — TTS 18-1 1 B VVELLFEAD= EVbEVOY SAL NOTES: WELLANGLE> 70° "' AGTLATOR= ' PROPOSAL --- OKB.B1V= 56' I] ' I BF.ELEV= ? KOP 2650' _ ( "NESXNF.ID=3.813" Max Angle= __°@ 20"CONDUCTOR-I- , ' 4-1/2 Datum MD= 12609' Datum 1V D= 8800'SS 13-3/8"CSG,72#,L-80 BTC,D=12.34r --I 2500' -2600 (-L9 518"X 7"LNR TOP PKR,ID= -9-5/8"X 7"LNR HGR,ID= __' MLLOUT WINDOW(18-11B)-2650'- 9-5/8"VN-IPSTOCK(XX/XX/XX) -I -2650 9-5/8"CSG,47#,L-80 BTC A B-M, --I --2650 \ GAS LFT MANDRELS D=8.681" ST MD TVD DEV TYPE VLV LATCH PORT DATE _______ 6 3002--3000 5 -4680--4250 4 -6398-5100 3 -7698-5750 2 -8616-6200 1 -9029-6364 I 4- HESXNIP,D=3.813" TOP OF CEMENT H -11991 -. .N. I II • 4 -13150 -7"X 4-1/2"TNT PKR,D " A ♦4 -{4-1/2"HES X NP,D=3.813" IA I10. ' I♦I ♦4 H4-1/2"HES XN NP,D=3.725" II♦I ' I♦I IJ. -13280 H7"X 5"TIEBACK,D= " TOP OF4-1/2"LNR --I -1328001•4A ezI -13290 -7'X 5"BKR HRD-E ZXPN LTP w/HGR,D= 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, H -13290 �e ►=x-`. -13290 H4-1/2"WLEG,D=4.00 .0152 bpi,ID=3.958" I i1, .. HELM°TT NOT LOGGED AV a►' ; -17'X 5"BKR FLEX-LOCK HGR,ID= .V _ Ali V —15"X 4-1/2"XO BUSHING,D=3.91' I I♦ ,11 I`4 7"LNR,26#,L-80 HYDF&563, -I --13440 I♦ • ♦•I ♦ .0377 bpf,D=6.226" • ♦ ♦ yl -13900 H_"OPEN HOLE SIDETRACK J I • PERFORATION S1MiARY REF LOG: _ _ I ANGLE AT TOP PERF: °@ • Note:Refer to Roduction DB for historical pert data ♦ I SIZE SPF NTBRVAL Opn/Sqz SHOT SQZ e t • ♦ e ♦ I /—I -14415 - TD • [ PBTD -192851 4-1/2"LNR,12.6#,13CR-80 HYDRL 521, -I -19405 ♦Me♦Al! .0152 bpf,D=3.958" .♦'��♦�♦���►� I DATE REV BY COM ENTS DATE REV BY COMVDJTS PRUDHOE BAY UNIT 09117/84_ RWN 41 IMTIAL COMPLETION 03/07/14 FM PJC PROPOSAL UPDATE VVE LL: 18-11B 09/26/90 AUDI 4 RWO 03/13/14 FIV/PJC ADD OPEN HOLE LNR PERMT No: 2131950 11107/09 NORDIC1 CTD SIDETRACK(18-11A) 04/07/14 FM PJC REVISION#3 AR No: 50-029-21181-02 06/19/13 PJC SIDETRACK PROPOSAL_ SEC 19,T11N,R15E, 1278'FAL 8 431'FWL 09/03/13 FM PJC PROPOSAL.UPDATES _ 10/07/13 FM PJC PROPOSAL UPDATE BP Exploration(Alaska) UM 1 W MO Z, NM Mo z mI a m It 0 I a. a) 0 W a) a ca Lo Cn V a C E ma a _ Qgi p ml N me- a) 6.0 CO a O , m 3 = cn m r 1 a p -0o ‘‘=. a. CD Z a` a °° , am N • • ' VI W cls a IC z v r co `W oo � � n n o 0 ry (cm CO OVI p M (p $$ N N SCO m Q Q h or Q. Y_ / • N N 0 U N N Q - Y 1 C O m m 0 OTJ a s a a m momNa § (w m m J JJU O O m m Li.) u) Im NmOm C C < I _ (0 m 0 m .. E Yn ami a°� > co m m J a � 3 0, m 3 hi 13 .>, 7 .- 0 c _' 3 m F W m N N c r O) 7 O1C a) J J( 9 ii C r V O) M Lo V C< O c $ J J 0 C u) N a O) '�. C K c b F= a) 0) O C u .� I W E v tV ` J N 0 O w N d V gyp 7 7 .0 ! 4 O O aWt d.O E N v O (0 '- u) y O t.' Z j, M O rail N N N O V M G 0 J 2 Z V) o y N N O I 0I n J N O M 'C O) u) M 0 0 .- Li, W OI Q. W u) j o o07) Vi CC O N _d CO al > W a) O) N C ,.., d v o I r ...CI' Cd _N p C O = • o O G a) + = O S. F i- + • W > N N a O m co y CO c m m o) W m t .E K o) v c a t c o) a �+ o c m 2 Z coo 0AI C t I .... m c o_ Z W 3 Tj N C o a Z w + a. o I I z a sr >- 1 s QN N m ! is N W • O 'n C> 0 , m m F 2 c a 0 m a=' J (n 0. O N N a g v m U m m m p Z z — J J J m W O N11. O O O a a) U � O 1 - z N- J o _ o 0 0 o M � m ry 0 O r O m g mU , o m a m a- m I Ld , u) m U m Q o mZ 0? Z ( I d co ro _ m COU > a r-.. p 0 m O m N mCN N ( O E m m Cl_ s y Y m g 3 f Lr L U m ml m Q m Z + -0 D Z < o ei z a a c I b C L c o a) C N O O E0 dE a1 C c N d to i0 c. o 7 7 ` ui y ay O %) m O N a O Oar pd c OH W 0 m c m m N ` N, «a dmu 2 m aR p Vl CZW C v �•- N 0a. co c a 202 (n mu. o. 3 3 a. 3 2 a a > > a VII O O O O O O 0) O) V N U) CO 0) (0 W o n o 0 0 0 (o c n N o <o a O O O O O M n ((i Nu (74 z O O U) M N N U ... ;W oo m LL � O o v v n n v) x x a • a o o O o o m LO o m LO LO LO Q Q d O N O o O U) U) U) U) U) U) U) N O N N U o N N 0 0) 0) 0-i 0) vi a) O) 0i U N N Z a g� Y 'Cr) 0 J O a a 0 0 Ce 0 V) m a m 3 3 .2 Y U) U) CU a7 co O O) UO N CO U) V CO ? U) N- O R C Q N- co m CO n v V .- CO CO n n CO CO Up 3 N N s- .- O O M 4 N 0) O N O p`p` 0 0) O) 0) 0) O) 0) co I (O U .7 0) el V V E U] N N N ca- a) N N N N N N N N N • co co 3 a' •C �' O) O) O) O) O) 0) 0) CO CO O) 0) 0) O) m E 0 7 co (D co m m (0 (D (D CO (D CD CD o ji c ❑ m m m I-- 1.11 W M M N- CO U) O 0) (D U) CO 7 CD V M n n co (D N (0 N O U) CO CO 0) 0) QD aO n n (O O O M UO n O hi O) 0) a) a) 0) 0) 0) O o- .- N V U) U O O) U) U) (f) in in U U7 (D 0 UO O O O C 0 CO O O O O O O O O O O O O C fD O co co O O D (D O O O O O H O) O) O) O) 0) O) O) 0) O) 0) 0) CO0) a) 2� �, 0 7 U) u-)- U) U) N U) U) U) U) U) N U) U) m c O c_ ai u W U m C 7 O O O M N O U) U) U) n N N- O 9 m C m U N N N C co 0) U) U) n O O N U] N 0) a N 4 w m — O .2 o t0 n � 0p 0) O U) t0 D1 Oi U) n O .. 0 y 3 3 C C YO C N M CO V (0 (O V m ro a E E m 0 m o "rel Ce A U U c m m J F- 2 2 co G U` 0 N o o N `m 2 U + U oCa O 0 O) m a' a' a' N a s 1.m a a a W E E a) + + + a) ON - .- O O W O N M V' u 3 3 0000 O 7 n n (D CO O CO O 0) o- CO n m U U T N N (V N 0) M t;I O O N N V( O Z O m CO 0 2 2 2 au) co g m c z co a_ m co n N a) a) V M co o N- N O v. O) M co co ('7 O In M O O V O COEL + a) (n 0 0 o en U) v (i a );aO 01 . N 01 Om m aaY pLc)i a) (o O M(D m el W W W O N (n (n U a a a CO 0) C N N N N N N N N N N M M MQ. z 220T- TT —8 00 > � � - I- 0 U' U' II N- N O) a) V co U O N- N O W V op co co 00 UO O 00 U) UO CO UO 1 0) 0 Ni U) U) O) O) W n ap Ui N UO N N- N- a) a) CO CO OI CO 0) O O UO O O UO O N- COO) O O (N Z _ O ^ N N_ Ni N_ N_ N_ N_ N_ N_ M M M M a ❑ O O O O O m a a a a a m m m m m m C m cO cO cO cO O U) U) U) U) op CO N- o- O n 0) O O co co M co co a co O U) n N O T U) U) U) U) LO 4 M Ci 0i M Ui UO n Oi N O (0 ^m O O O O O M M M M M M M aD O N N N 0 a a a a a O N N N N N N N M M M M M M $ �I �i�i�i�i E ^ d0mmmmm �' a ,t- m (73 S a a a a a .N 1 LoN U) N 7 7 CO CO CO 05 CO O 4 N a00) 5 UO O U) C 0) N 0 U) N CO CO ,_ ,- r Q .- n CO Nt 7 N- N (D a a m U) O O O o M N N R ? V n O 2 O U) O O O O 0 p ✓ U) O O O U) U) p u I D>. m0 C) U n 0 • m o d N- co) v v : C o md w N N M Pi (0 v m E Q) I N < O 0) m CO CO m O 3 m 0S apV O Lei b Z Cl_ a E O U) O O O OLO U) 0 O m 0 L O M O O O O n O O Q) o in o 0 0 o u) o 't U) c U) co 0 0 0 0 0 0 0 0 O Un0 U� O O T V UD N- O u) C Ui J o cp o U7 O o co a d O CD .- CO v m U) U) n N n N 0 0 o O O o N O N _ CO (O t0 • (D O N- CO o O O N N O `O N N N (7 (7 j Q �^. N a N a N Ni 0 v) t N t N N N M M UO M (+i M a '7 C .. I- LL III is, F Y co N N co N a 0 (8 _$ C T m C N cia y33 a (r) a a 1 • y0 7 U) CO CO n o v _. m CD 7 CO 0 0 0 0 0 0 0 0 o W 7 CO O n O h ) O o CD M O D CO O O O O O O O O in 1 r) —. W 6 N- N- 0 CO CO ui u) u) u) a V O O O6 0 0 0 0 '' co - gmoW dA o Iv F ," O sz 0 u u _ = a CC CC u) u) u) U) In u) u) u) u) U) In U) U) U) 0 0 0 0 O O O 0 Q Q a u) u) in in v) in U) U) in U) in U) in 0 U) O o 0 C) 0 0 0 0 g0 Z ri ri Cri ca ri c' of ca ca ca ca Ca ri ri ri o 0 0 0 0 0 0 o U N N Q N 03 7 y a J O CO CO 0 O co aa a a N N N CO 3 3 3 Y Ul N l6 CNO n M M 7 CO M 0) 7 7 N 7 N 000 N O) CD CO M O n M 7 7Z Q CD 0 7 7 CD O r O n O N u) M M V U) u7 t0 t0 r O CD 7 7 Ni (O Ni CO u) (O n U) M O CO O u] 6 M O n u) W 0 N- 0) n 7 N O O) CO M co O N- CO O CO CO N 0) CO u) N CO 7 O O O O O O 0fO) OW co co_ co_ n r n CO CO COCD N 0_ - m CO 3 a' C �'r 0) N N N N N- .- m O) O CD O O Q) CD O O) O Q) O) T m CD CD O O 0) CCO D ID E 2 .N ca co coD co co 0 CD CD Co ro CD CD CO CO CD CD 0 CO CD CD D CD CD CD 0 10 � °� °� � � w w " CA CO CD u) M CO 7 CO u) CO N- CD O O 7 CD 7 CD N 7 CD 7 CD CO N 0) CO N 7 7 n 7 7 M CO 7 7 CO 7 u) CO 0 7 0) M 7 r 7 n U) n O u) M n M M CO MN Ni M 7 j— N CD 7 G )r 0 7 CO CO CD CO 7 O 0 N 7 0) N n O 'O O) CD r n r CO IO CO 0) 0 O O N N M co 7 U) u) CD CD n W .- i:C .c L e N N CO CO coOcoOCO coOCO co CO CD CO CO CO CO CO CD CD CO CD CD CD t N 0) o) 0) W O co 0) 0) 0) O 0) O 0) 0) 0) 0) O) O) 0) 0) CO O) 0) ca 2 Z .3.. u) )n N u) IA Ul uI u) uI U) u] In ui ui u) ui u] ui u) u� U) ui co- re c cD ci C c ui o m U m C = 0 u) M CO 0) O) ID 0) 0 0) , N N- CO N O CC 0 CO N- CD u) 'O C C") V coN CO 7 N- M N CO7 CO COM N 0) u) CO n CD u) r rr r ;54, = .1 d CO N N M CO O CD CD 7 M M 7 n O Ni 7 m W u) 0) M N o U N CO O N 7 r co W N N u) co co 0) 7 co co CO .- U T W I I N N N N M M M M V u) U) N CO r 0) a 2- 0 t ZS UJ F r O . a O C 0 Q a) _ Q' u) 7 O n o Sr 0) 7 7 M _ M CO 0 7 CD O 0) f0 0 N M N u) D I!) CD CO 0) O 7 n O n O CO N u) 0) 0) N C0 0) >. ui CO CO 6 6 0 s- O) m N6 6 7 •- O — Ni N r Ni M M M CU n O 7 03 CO N- O) 7 O 7 N- 7 N O M CO CO 7 u) N O CO CO 7 7 7 N N N M 7 7 7 U) CD n r n m 0) 0) 0 N CO C Z .... 0 a j co M O0 0 r CO M CO O O u) m V CO I I D) 7 M 7 M O n M 0 O a) M Q) 7 .- r CO CO 0 0 7 7 M Sr 7 '- u) N ui N O 7 Ni CO 7 O CO n CO u) u) 7 Cr) Ni m N , 0 CO7 7 T N- N u) M0 0D)N- M 0) 7 ,- '- COM CO 0) 7 0) 0 7 01 7 O) , a) N In CD CO r CO CO CO 0) 0 0 0 N N N CD N O N CO M M M M M M M M M M M M M 7 7 7 7 7 m M O O O 7 N- CO M 7 7 O 0 0 u) 0) 7 CO 7 0) CO 0) CO u) N CO N M 7 CO 7 01 CO N 7 7 u) 0 0) 0) CO CD O CO u) CD CD 0 CO 7 O) r O 0) N 0 N 0 O) 0) r CO u) CO N- CD u) CO CO N O) CD CD M 0 0 M CD 7 CD CD 0 IC) 0 (I) N CO 7 u) CD CD n _r CO CO 0) 0 O N N N M CO 7 7 O --- r) r) r) r) r) ca" ca car) r) r) v v v c v v v v v v v v g N. CA 0) M n N CO CO r O n 0) CO 7 M CO M M M M M M M j CD M CO r (f) O N CO CO 7 CO N CO 0 O O Ni M 7 7 7 u) u) u) CD CO n n n N- C- r n n r n • N M M M M M M M M CO CO M M M M M M M M M M M C') CO M M M M M M co co M M CO M M M M M M M M M M M E _ N• L. a m •p 1 a co co r CO WN 7 CO CD 0 MUD 0 7 O O O O 00 0 O O O u) CO 7 CO N- a0 N n O CO CD M Cr) 7 n n n n n n n r Q 0 O a h 7 CO (O vi ui (O Ni u) O) O O O O O 0 0 0 0 N N N M M M M 7 7 7 7 U) u) N CO N CD CO CD ID CO CO CD (D N �� u) U• NO V 6".....00w ' aE oI w L .c m m -0 0 o O E co QO co CO L Z a a O O O O O co O O W O O O DOD O O o O O O O O O O O O O O N O O 000 O O U) 0 O O O N 0 0 0 0 0- >. O O O O O O O M O O O O O u) co D O O O O O O O O O 0) O O O O 0 CD 0 0 O) 0 0 0 0 0 M0 0 0 0 0 0 0 Q M 7 ut0 Z ) n n CO 0) O) 0 r- N CO 7 7 a0 U) CO n N- CO 0) 0 ',- O M M M M M M M M M CON 7 7 7 7 7 7 t 7 7 7 • 7 7 • u) U) 0 C , O 0 ma)ad ro c U am330 a N o VS I 0 0 N CO CD M 0) f0 CD N CO 0 0 0 0 0 0 0 0 0 0 0 0 CD O O a 0 CO O a co a (O M 0 0 0 0 0 0 0 0 0 0 0 0 0 l , W 0 0 N.: N- CD CO CO V v a or o) 6 0 0 0 0 0 0 0 0 0 06 0) 0) 0) CD O) 0) 0) 0) D) 0) CO �WmOS F. g u' oo C. O a a u) II II Cn 2 2 a d' d' o O a 0) a a a s a a a a 0 0 0 0 0 0 0 0 0 0 0 0 a O o o 0) 0) 0) CO 0) 0) 0) CO 0) 0) o 0 0 0 0 0 0 0 0 0 0 0 Z 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 O O 0 O 0 o 0 o o 0 N N Q N Y YJ a CO N O O 0 0 a a CC a N N N N 7 z 3 Y CO n LO NN O u) N.- 0 0 01 N-N- 01 CO N. CO 0) N M 0) 0 N M 0) N-N- a 4 Q co O u) O O u) LO ui 6 O M 0) CO N. CD a M N x- O CO N- CO O O M N- O O (b f0 Ll') O u7 O N- O M CD 0) N u) CD M CO 0) 0 — O I,- Cr 0 O CO N- M CO CD CO CO a 0) a 0 U) 0 CD CD E tO 0 u) u) a a a CO M N N N r' .- O O CO a) O CO CO n n 0 CO CO CO = d' C �' 0) 0) O) 0) D) CO O) 0) 0) CO CO 0) 0) 0) 0) CD CO00 0 0 CD 0 0 0 O E •may CO CO CD CD CO CD CO CD CD CD CO CO CD CO CD CD CD O CO CO CO CD CO CD CO TD c Q CO ro OS H W W N 0CO N CO N 0) CO M N- N CO a 0) U) 0 CD N- N CO CO 0) _ CO 0 CO a M a C` CO O a M CO a CO a _ (`• a 0 N- M 0 n CD f0 a N- M N N- 0 CO C) u) CD - ') CO 0) . a N- 0) N G) N LO 0 CO CD a N- 0) CO a 0 .- CO u) M 0 h a 0) CD M V V 0) CO0) 0 0 r- N M CO M a u] 0 CD CO h co co 0) 0 .- N M a CC O C -- N N N N N N N N N N N N N N N N M M M M M M L t 4-' tD O CD CDCD CD CD CD CD CO CD CD CD CD CD CD CD CD CO CD CD CD CD CD N N 0) 0) 0) 0) 0) 0) 0) CO CO 0) CD 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) CO 0) a) E O LAI LO 0 v) LII. vi ui ui 0- v) ui vi LO LO 0 u) Ln vi ui u) u) 0 v) LO C 0 C 6u io U d C O V N- M CO 0) N CO CD a x- CO r N r N N- N N- N n N N- N P- C U E N a a CD CO a N N- a l0 a CO O) a CD COa co. 0) a ` C r rr r r O ` w R ,- C'D u0 CD CO CO r r O a O 0) a O Ln O CC) CD CO N r O U N u) CD CO N C0 0) M CD I� N CD CO 0 1f) 0 a 0) M CO N N- CD 0 U N = m a CO CD CD n N N- CO CO CD 0) 0) 0) 0 0 N N M M R R CD Q ca 0 0 r Z a J r2 2 h 0 W 0 0. N Et O N 0 0) M CD N CD a 0 0 N- 0 a CON CO 0 a CO N CO x- CO T M CO N 0) N- CO CO O) x- CD N ax- W N. CO a CO CO CO CO u) M N a N4 C+) N o h a a 0) a0 CO .- CC) 0) C'7 r aD es;CCO O cU a N. N 0 CO CO M CO CO CD 0) M x- CD N M 0 CO CO N 0 N- N CO M ') LD CO CD N- n CO CO C) 0) O N CO a a N CD n N CO �- N N N N N N N N N N N N al C 2 o a_ j M 0CD N- M M 0 CO CD CO M CO a n N CO O u) M M O 000000000000 u) O C- 0) CO n N- CO a f0 O CO a fD fD co CO CO CO CO CO co (O f0 ca a N O M CO MCO N M O M N co M co M CD M CO M CO M CO CO O En a a a LO LO CO CO N. r N- CO CO CO 0) 0) 0 O x- .- N N CO CO a yco 0 „ a s v v a v v v v a v v a s a N LO an 1. in u) )n )n N co a 0 w 2. M 0 CD N- CO M 0 1f1 CO .- CD 1- a- CO N CO 0) N N. M N 0 CO CO u) COCOCO CO CO COCOCO CO CO CO CO . . O N 0 O a N M 0 N 0 0 CO 0 CO 0 ) 0 0 N 0 CO 0 O 0 CO O 0 O 0 O 0 O 0 O 0 O 0 0CO00 O O CO 0 CO 0 0O u) u) LO O CD n N.n h (O CO 0) O O N N M CO }' a CO 0 v4- v v v c v .0 v v v v v vi vi vi vi 1.6 vi LO Lo- Lc.) Lc-) N N M M a N- C) M M N N` 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 a M N N M 0 O) CO N LO LO LO LO LO LO LO LO LO 0 N lD N- N- CO LO a M N 0) CO CD CD CD CD CO CD CD CD CD CD CO CO CD .0 M M CO M M M M M M N N NN N N N N N N N N N N N M M M M M M M M M M M CO M M M M M M CO M CO M CO CO E g_ CO Ti 4 arn O O N 0 N CD N O N O O O O O O O O O O O O O LOO O O O CO M N O O O O O O O O O O 0 O O O O O O O O O O O O Q d CD CO CD CO CO CO CO CO CO CO CD CD N CO CD CD CD CD CD CD CD CO CD CD CD N N U _ I a e1 v 1: m m ° m C C. 0) co tel oo m D3 O la ) L L r r � � � a O 3 co CD 0 CO 01 O z a a o 0 0 0 0 0 0 o n o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O LO q) 0 0 O O O N- O 00U) 0000000000000 a T O N J O O O O O a O O O La 0 O O O O O O O 0 0 O O O p N O M a O O O O O N. 0 0 0 M N 0 0 0 0 0 0 0 0 0 0 0 O O /1 N N CO a CO CD N- N. CO 0) 0 0 N CO a u) CD N CD O) 0 N O N Cil u7 t LCi ui LO LO Cfl CO ? LO LCI CO CO N CO CO CO CD CO CO CO CO CO N- N- I, Lf) 0 cy, 0 Q V C C N cn O 00 m R 0 a o 3 3 0 a a N O 0 0 0 0 0 0 O 0 0 0 0 0 O U) 0) 0 U) V CD N V co W O O 0 0 O O O O O O O O O O O O O O 0 n U) 0 v, O) c 0 CD N co 0 0 0 0 0 0 06 0 0 0 Qi Oi 0) Co N 1-. N cD 6o V M M M M M M M M M CO Ell ss R0 )` O = n n I.. h II II 2 2 Q Q O O O O O O O O O O O O O O N N N N N N NNNN d O O O O O O O O O O O O O O n n n n n n n n n n O N N U O 0 0 0 0 0 0 0 O O 0 0 0 0 0 N n Z N N Q N C) S Y Y 0 J 0 N N aa a a V to N m 7 J 7 Y O O 'ii U) N 0 CO CD at N O CO U) CD C N O) CD 0 0 N CO V U) 0) U) U] V N O 0) CO O O) )!] M V N CC O CO e- U) N ,- N U) j Q M N 0 m CO 0) N U) U) CO m M V CD M O n CO ori N Oi O O 0 C) N N n M Oo M CO a N 0) R 0 OD co U) O CD N N M 0) U) uE O) U) 0 N a V CO M N N N ,- L- ,- 0 O O O 0) O) Oo Co n n n co O O O O O O O O O O O O O O O O O 0) 0) 0) 0) 0) 0) O) m m 7 2 C O) 0) 0) 00 0 0 0 0) 0 0) O 0) 0) 0) 0) O U) O a0 a0 O] DD a0 s- ,- N E y O CD CD CD CD CD CD CD CD CD CD CD CD U) (13 CD co CD CD co co co cD co c 0 co • m m I` W W M U) 0 CD N N CO M N 0) V 0 0) U) CO CD a U) M 0) N 0) N co O N CO 0 CD M CO <D V N 0) CO. V 0) N CO CO CD N a CO n U) N co NO 0 N- V O M C) co O C) CO 0) co U) ca N n C) U) co U) M 0 n CO 0) 0) 0 M N N CD N cO M to CO N CD a M U 9 O) V a' U) CO n n CO O O O O � N N N N CO V N co t0 n CO m O C M cC) M M M M M M M 4 V 'C R 4- 53 m O) O CD CD CD O CO CD CD U) CD U) cD O U) CO CD CD CD CD CD CD CD CD CD 000) 0) 00000 0) 000 O) 00000 00) 00) 0 ! Z .- If) 1.6 ID 1D 1D 1f) U) 10 IA 10 N7 Lei lD N7 IA 1D to- l0 ID lD U) l0 l0 1n C N NO CCCaCN O V N a- u) 0) M O U) 7 O M O c0 O ` C V R O O _V Ccio' 0) _ C Ua) U) 9 ` w co NNN M Co M CO a 0) N4 O) U) n O V' 6 O O) CD c0 N CO Vw co Q N C) U) C) CO M N N 0C .- U) 0 a U] 0) CO N U) 0) M CD N a ce7+ W U) Li) U) U) U) N N CO CO CO 0) 0) 0 0 O O O ,- •- N N N CO CO 7..i IXN d 7 N N N N N N N N N N N N y1- W j 2 Z CO 0 I O Q. N CC V CO M N U) 0) M N 0) U) 0 N O CD 0) 0) 0 U) U) CO N CO N O CO N U) M N O N O) n CO CO 0) 0I N N CO O N �' C m U) Oi C) n N C 0 N N c0 M r- N CO N U) 1) O) N 0) n V 0) co R O CO U1 m N M 0) n U) M N 0 0) CD 0) CO O N N CO R R U) U) CD U) n n CO CO O) 0 N CO CO 7 N N N M M CO- M M M M M M M M M 4f To m C z CO CL 0U) 0 O N O co co co CD CO N 0 M M M M M M M CO O M M M O O n M n O O N N O 0 CO CO (0 U) c0 60 0 6U) f0 U) 06 0 C) 0 N Ci N Oi Oi U] �- co a0 M co M CO co CO M U) co M co O N M co N n U) CO N U] C) CO h 7 U) U) CD O N n CO CO OO 0) CO 0 O O O .- .- N N N M M V7 N N U) U) U) U) U) Ul Ul N 1!] U) cD c0 U) C7 CD- CD- O O O U) CD Q O CO co 7 O r- r- .- ,- .- .- .- co .- -• .- O O Co O cn C) CO MOWN U) CO CO CD CO CO CO CO CO U) CO CO CO U) U) N CO N U) n N U] O M . N O 0 O 0 O 0 O 0 m O 0 O CD 0) O n M O n cc. M CO N N U] 0 U) 0 U) 0 U) 0 O V 0) M n U) CO N U) ll') CD CD O N n n CO CO O) d) W O 0 O 0 O 0 O N N CO CO M .11' O ....... U) U) U) 00 vi U) u) Ui vi ui co co ro 0m co CD of m vi vi CD- co g 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n N CD N 0 a 0 U) N N U) U) U) U) U) U) U) U) U) U) U) U) U) V CD CO0 N M V U) CD 0) . O CD CD CO DD N N cd N N O CD cciN N O) N O M CO UI co n CO • N NNNN N N N N N N N N N N N M CO M CO M M M M M CO M CO M M M M M M M M CO M M M CO M VIM M M M M E _ a m .N a U) 0 O 0 0 0 0 0 O O O 0 0 0 O O O CD O V O) CD M N- 0 0) U) O O O O O O O O O O O O O O n O M CD O) CO n s- U) CO 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0a) N C) v m r Di 0 Q a co <D CO co co co co O co co N O O cD co co CD CD CD CD U) CO U) n N 03 Ui LO 1 I CO 0 Q• O co m al is }0 L L m r c 0 .- ON O 2 co CO U) CD L n Z a a 0) O O O O O O O 0 O 0) 0 0 0 0) ? 0 0 0 0 0 0 0 0 0 CO 0 0 0 O 0 0 0 0 0 C? 0 0 0 M CL co 0) O O O O O O O o O T N O O O O O O O O U) O O O n J W O O O O O O O O O o CC co O o O O O O O O M N O 0 0 N 0 n 0 0 0 0 0 0 0 0 0 N M V U) CD n Co 0) 0 0 N- N CO M CO V U) CD n CO C) 0 ,- N O ID = 0 C n .- n n C n N-- N-- h co- co t CO co co co t CO N co- co co- CO co co O) 0) 0) cii �Cp .. _0 t. .O W ▪ - D CO CO eta m . 2 C O C N • Vi O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U) W N- CO n o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a All el m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � ai `W o o mo 0 LL O II II _ = a c, a' 0 0 O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q Q N1 r n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r r ZO N N Z O o o o o o o O O O O o o o o o o o o o o o o U Q r N . Y 0 J8 LO LO 0 a a C CL 7 7 3 Y I ''. 0 0 l0 N. m N m M N m V 0) LO N- U) CO N m 0 V CO U) 0) M h 0 Cr m N U) N 'Cr m V U) m 0) '- NCO LO m m 0) 0 NCO V m N 0 ) O M '., j Q M U) m M 0) m M m a 0) V O) st 0) sf O U) O U) O U) O m CO m m 0 co m m N- NJ- O n CO O co M 0) co co 0) co N 0) U) N m U) E N co m m m m U) U) N U) V M M N N N O O O 0) 0) O) 00 m CO 7 a' CT 0) O) 0) 0i O) 0) of 0) 0) 0) 0) 0i 0) 0) O) O) 0) 0) 0i of O) m (0 LA r. m m m m m m m co m co co co m m co co m m m m m m m m m .E w 7 m m CO m m m m m m CO m m CO m CO m m m CD CO m m m m CO E_ a) CO wa CO sr N _ 0) N- U) N 0 N- U M 0 m U) CO 0 CO m M CO m CO 0) M 0) Cr O m N CO CO 0) 0 m N CO Cr 0) LO N.- N CO V N m N M .- 1- O O 0) 0) m m m N- N- m m U) U) U) si si M M 6 N m n- 0 m C) m N- m a M N 0 0) CO N. m LC) a CO N ,- 0 0) U 9 p) O O '- N N N CO st U) CO N- CO C) O O N CO st N (13 n CO 0) 0) C O C U) ..11- U) U) U) N N U) U) U) U) Ui ..6m m m m co- m m m m co- m m m m m m m CO m m m CO CO m m m CO m m m m m m m m m m .r+ a 0) 0) 0 CO m 01 W 0 O) O) CM m 0 01 0) 01 0) 0 01 LA O) 0) 0) 0) • fO 2. U) Ui L0 Lri 0 U) 0 U) Ln 0 0 ui U) u) U) 0 U) U) Ln Ui L L Ln L6 u6 Lro C 0 c m LOi m V V m 7 m M 0 mM O) co h CO 0 m N CO C 0 N- CO 0) U) N. CO 0 C C �L O • CO ,- co n 0 U) ,- N N CO sf 0) U) O m N N- CO CO sr co U) , N- 4 - g LF 01 N m v N� 0) O N U) N- O N U) N- o M U) m O M U) m M m o O w m m V N O M m m O M m 0) CO m CO N m CO N U) 0) N U) CO N U) m () q LG T st s{ Ch Cr Cr U) U) U) U) CO CO CO r N N- CO CO m 0) 0) 0) 0 0 0 t� IZ O) 0) N N N N N N N N N N N N N N N N N N N N N M M ( C7 O > 0 O 7 100 W 7 J I- 2 Z CA 0 O a a) 1 IY 0 sr CO N ,- N ,- N 0 V m CO N- m 0 V 0) CO N- N m 0 U) 0) T ii V 0 m s- 0) U7 O a0) M N- N m '- U) O ch CO CO N- N m ‘- N 0) m 4 o V C+)11) ) U) m m m N- N- m moi 0) o O6 r N N M vi C+) COm M r m N 0 V CO N 0 0) CO r m m U) C M N 0 0) CO N.- Cr U) U) m N N- m O) O '— N N M cr U) m N. co co O s- N N M sY ^. ; Nn E v v v v v v v v6- 6- 6 U) U) U) U) V7 U) 6- U) Lo CO m m m QO- M m C Z 11 m a j 0 ,- N- 0 CO 0 m N 0) U7 N CO N- M 0 m CO 0) U] N m Tr N- O m 0 N- CO m Cr 0) U) ,- m N CO M 0) U) 0 m N- M m sf Ui O M ,- O m m M m m 0) m m f� N 01 N a m O - V CD m 0) N U) N- 0 CO m m 7 N- 0) N U) m 0 CO m 0) Ol CO M CO sr V V sr 7 N N U) m m m m r N. t` n m m m W W W m O C.-- CD- m ui m m Lo m m m m m m m m m m m m m Lo m m m (O m Q- CI ▪ 0 ,-_ N 0 M 0 m N 0) LO N CO .41- n CO 0 m CO 0) U) N m sr N LO m U) N CO CO 0) st O m N.- M m Cr O U) m N CO M 0) O si m U) 4 M O m U) M m m M m m 7 0) m tt m m U) co N- 0 N CO m CO ‘- at N- 0) N U) CO 0 CO m 0) ,- VN 0 N U) ✓ Cr a LL) m n n n Cm m m N. N- N CO CO CO CO m m W 0 0 0 - - - - - 0 E m m m m m m m m m m m m m m m m m m m m m m a n n N- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO N 0 N N N 00000 00000 00000 0000 m O 0 0 o O O O O o o O O O o o O O O o 0 0 0 0 0 L CO CO st 0) sf st 'Cr CO CO CO sT V CO Cr Cr Cr 0) CO st Cr Cr CO COM COM CO COM COM M M M M M M M M M M M M M M M M M M M a g m •N a CO 1 m 0 % 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U) N 0 0 0 0 O O O O O O O O O O O O O O O O O O O O 0 of v a c v v v v v v v v v v v v v v v v v v v v v v Q a '' N- N. N- N- N- N.- N- N- N- n N- N- N- N- N- N. N. N- N- N- N N- N. N- N U co O co C L 0) E m m a 0- 1 CO < O CO m r v a t O 2 m aD m M O Z a a O s- g O O N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O co OO O Mo O O O O O O O O O O O O co O O O O O O O. T O O ? O O m OO O O O O O O O O O O O O O O O O O O p 0) 0 U) 0 0 CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a t CO CO N Nr U) U) CD m 0) O ,- N CO v U) m N CO O) O N CO v U) O J (A 0 g of of a o) 0) of f o) 0 of of o o O o 0 o O 0 0 0 ,_ ,_ '- � Lo c ii • '17 27 co C) v C a 0 5 « o m rn C o ✓ ain33o a _I o O o O CO u7 O m R 0 (0 0 n m N 0 0 0 I', b W O O O O N N O 0) m m R N O 0) n M O) lI O O -0 1 O O O O M M N N U) U) u) u) R R R R 7 R C) O O O I '' N- N- n N- N- N- N- n n n n n n n n CO ;W ss m� - 11111 o x co co x x 0 0 O a cr a' 0 co 0 0 U1 U1 u) m N V) U7 u) u) u) 0) u) u) u) u) Q Q a O O O O o 0 0 o a) CD O O) Of O) 0) 0) 0)0) 0) 0) 0) 0) 0) 0) 0) 0) 0) a) a) CA 0) 0 0 0 Z N N U N N N N N N N N N N N N N N N O O O 0 O N n Z N N Q W 7 . Y_ a J C m m O 0 a a a m m N m 7 7 = OO U) m 0) R CO u) N CO CO 0) l() N CO N R M M n R _ 1° W a- In O) n• O m 11 m n N M M n O) n m M m O R R Q n m C0 r n N m R 0) n m co m m m O O O CO m 0 0) CO R N n R 0 n R 0 N- R CO CO u) M 0 0 CO E Y m m m m a0 n N- N- m co (0 1n U) in Ul a a a sr a a M dD m m E ct C i Oi a0 a0 co- ca 41 a) m m m m m 07 Q1 m m m m• m m m a0 m m m m m m m m m m m m m m m m m m m CO m .E w co m m CD CO m m (0 m m m m m CO m m m m m m m m CO to C_ Q co m m F 2 Lii W R O) 0 CO n R n CO 0 m N- CO M CO R n N R N co N- O U7 O) W co N U) CO m M O O M O) N m O) O) O M N n O) m O N 00 N R O R R O R C) R R Y) Rm n x- m R M N O CO u) M 0 N N- M 0) u) CO 0 N U 'O O) O 0 .- N N CO R 0 m CD N- CO 0) O) CO 0 0 — 1- N N N E O n n n n n n n n n n n n n n n (0 (0 m a0 CO- CO- (0 m CO m m CO m CO m m CO m m m m m m m m m m m m O W O) O) O) O) O) CO O) O) W O) W O) O) O) O) CO O) CO W CO CO O) 0 a 011- v)re tv) m ui ui m u) u7 ui ui vi ui LO- u) vi vi vi vi ui U) d C I ui O c e) U R 9 CV y 7 O) CO N N- 0 CO m N CD 0) r m 0 M 0) u1 M m O O ` C U CO N CO CO CO CO O O) u) m O CO CO n CO 0) m CO N m U) 9 A u] — C) O (0 (0 oi R u) CO co O R M n M Ci m M N O V N M u) m O R m R n 0 M CD n 0) N R n 0) CO 0 N N N N N M M CO R R R R R U N N cc) N m CO O cg C) CO- CO- M (�) M P) cam) P) P) P) M c�) C') C7 C') CO- C7 C7 C.7 C') c') `60 N f co y 0a O 0. U) CL N co m m R CO N 0 CO O) 0) n R R 0 0 CO 0 N CO N. a CO m .- W O O m CO CO O) R M m CO M N R O) M CO R R O ui M m m m m O N R O U7 m M n m m m N CO (f) 0 0 CO N 0 m _m R N 0) m N CO R CO 0 0 0 (O N CO n n CO O) O O N CO CO a a U7 U7 m m CO n N- (0 (0 (0 m m m n n n n n n n n n n n• n n n n CO C Z (0 a jO n M M Y7 n CO 0) N- CO m 0 CO m M 0 (O 0 n 5o o m (n n N a n o N o (n U) 0 0 CD o m m N- O N v) cO u) N- ri c 0 0) ri R O (0 R O C ri vi m O N R CO N- 0 0 m M m R 0) CD CO M 0 N- (O N CO U) Ol y _ 0 0 0 0 0 — .- r- N N M CO R R to CD CD N- CO CO m O) m U) n n n n n n n n• n n Q... O N O — n CO CO (O N- CO CO n CO CO s- 0 CO CD M 0 (O 0 N- ./. U) N O O N m m n N N U) 0 m (f) 0 0 m (f) U) R co M . R N co O N 0 U) mai 0 R N m u) CO O m R WR N- m N R_ n Cr 0 CO N R 0) CO CO 0) CO O O N N N N N N CO R R 0 u) u) CO n CO m CO CO 0) N 0 C N O O O 0 n R O m u) N CO CO R CO R u) 0 0 0 O N N N N 0 m u) N O) O CO O) 11 R m U) 0 0 0 O O OO O6. W O) O) m m m n n n n co m N N u) (O (() R R R R R co co co co co co co co M M M CO CO M M M CO co co co M co co co M M CO M CO M M co M CO CO M M M M E _ a (— co •N Q a) O O O O N N m N m ()7 N O) O O M 0 O a O O O t17 O O O O cc) m m n m m O] O O .- N M M O O O O O R R R R N m m r) O n R N Oi (D m M O n ui u) (O N n N- n n (0 n (0 m m m U1 v) U] R R R R R M M C) M CO N CO CO _ _ O U▪ CO ml C 0. n co E m m a s L I- r 7 ..- kr) 15 O 2 co Z a a — O O R (N O O O O O O O O O O O O O O N O O M O m o 0 CD y 0 0 0 0 0 0 0 D o m o 0 0 o N- 4 0 0 o 0. T N O O O J O OO0000 O O O O 00 '- 2 O NO p U) co O O U7 0 0 0 0 0 0 0 0 0 0 M 0 0 0 0 CO M O N 0 O Q. t U7 m N- n m 0) 0 .- N M R 0 CO CO n CO CO 0 0 N N O 0 a — 2 — — — 2 - — N N Al- N N Al- N N 2 N N N CO- CO- 2 CO- M K M h (c 0E4 ,t7, 12 a = 0 u) 0 u) F v �+ m C N ��TJ� 0aw330 a N yO 0 0 0 0 0 CO CO CO 0) CD r) O O O O D W 0 0 0 0 0 0 v <n CO 0 r� C� m o 0 0 o a D N N- 1 0 0 0 0 0 0 0 o ai ai 00 C 0 0 0 0 5 m CO �W 00 ;-o O O 4 sr II II LL co 2 2 a D_ a' 0 0 o O O o 0 0 0 o O O O O O O O O Q Q d o 0 0 0 0 0 In Ul to co co to LII o a o o 2 O 0 0 0 0 0 N N N N N N N N O O 0 o O 0 N N Z Q OI N m m m Y Y_ 0 J 0 m N O 0 0 D_ a a a LOU) N ID 3 3 3 Y O O IO (0 CO0 0 0) .- 0) 0 CD 0 C) CO V) CO C) CD 0) In In In O 0) O co co D) co C) In C Q CO V N m 0 0 CO N N <n N O) h O O N. N- C) N 0 0 0 N 1)D 7 N0 0) N CD M r) CO n V CI ESL O) C) C) C) C) M M M C) N N N N N N .- .- s_ 0 COCO03 c eo a0 au 10- eo a0 m a0 CO COCOCO CO- 0 COCOCOOD 40 CO CO 0 CO OD CO 00 CO a0 0 CO CO CO OD CO CO CO = m .E2 •y 7 CO <D CD CD ID CD D 0 CD CD CD OCD CD ID CD CD CD CO o CO H Ill ly �. CO 0 0 V 0) N N CD N- N V r) .- 0 0 N Cl) O CO U') <O OD 0 N V' N I,- N N CO Of N CO CO 0) O• 0 N N 0 CO o N co 0 0 O 0 In G1 1 a) co co N n n N 0 N CO M r 0 N CD 0)a) C.) 9 co N CO C) M CO C) C) C V ap C co <o IO 0 0 ID 0 O C CD CO- 00 OD OD CO- CO- OD CO- 00 CO- OD CD CD aD a0 a0 CD 0 0 CD 0 0 0 0 CD 0 0 CD 0 CD 0 0 CD CD CO m N D) aI 0) 0) O) 0) aI CO O 0) 0) O CO W 0) CO 0) 0) • 2o a- ,n- CD ui vi In .. In In CD ori .. .4-; CD CD ."3- uD <o Lc,- ct .m+ C diO 2 62 is CV m 7 0 COCO 0 )n 0 N C) N r) N IID CO N ` C V C') N- 0 0) N ',- CO CO ? r) r) CD N (D 0) l!] s- CD :5,3 g) w A d1 N <O CD o 0 o O f0 N O N V v C) IO <o CD CD w m () N V 7 co 0 0 00 0) 0 N N 0 CD CO On ✓ m �) co <o <o CID CD CD CD <o N r N r .- CO 00 CO CO c� R m m a Ci C) C) Ci ri C) ri ri r) ri r) C) <•� a of r) n ri J t-Z 0 (5 O a CD CL CO n a) In In CO In 0 00 CD 0) In o) v C CO CO CO C) If) a) C) C) N N 0) 0) N N 0 T O f0 Nei C) C) co CD C) N V 4 OD N 4 s- O 2 a) O N n N IN N n CD O ,- IC) CO CD 0 N CO 0 N. 0 0 CO COO CO 0) 0) 0) 0) 0 O 0 .- .- .- N a y q N N N N N N CO- COO Co Co CO- co- m c Z - m a j O00 0 O 0 CO 0 N O O N O CD to (O 0 C) 0 O N O o N O N O O O to O) O O C) O 0) a0 O o r) CI N 0) R N N ri N V In ai CI_ 1 CO 0) r) co CD r) O) 0) N N 0 O al co a) 0 O o - N N N N r) C) CO V C ON n N CD CO OD Co 00 CO CO OD CO O CO- CO- aD W aD CD a 0 CO 0 0 0 CD 0 N 0 0 N O CO <D 0 O C) 0 N N co N N NIl] N- co. u) 0 N O V N N CO In CO Ci C) LO N N CO N C) OD N CD 0 OD 0) C) ✓ CD 0 V N- N N. N V co a) CD co co N <D CO 1 O O N N N N CO CO CO V V V C O F co- aD aD aD aD aD aD co- co- aD co- co- co- aD aD aD co- cc,- 1 7 0 0 0 0 0 0 co N co N lD In V O O CD CD 0 O 0 0 O o O a) N CO CI O I- N N N N N N . CI C) If) If) If) <n <n If) C M 0) N N O O O O O O O L C) r) C) C) C) C) C) C) CI C) r) r) C) CO CO r) • VI CO CO r) CO r) CO r) CO CO r) r) M r) CI <h r) r) E a- N m 'N a In O 0 0 0 o O N. <o co 0 CO N O G co O O O a 0 O O O W N CO N C) CO W W co co O No N vi N N N d) O l(i O O V N `t N n n N Q a V) CO CO Y r) r) CO CO r) V R R co N co N In N )n N p a 5I a r U 0 mI C = Y p VI m m Q o d a1 > U O m A .0 -C 0 m m Q. c U. J 7, r O O E m CD co Ou 7 > co L Z a a co d O O jE O CO <n I� CO V 0 CD .- 0 .- O V 0 O N 0 N 0) O.0 0 V N CO <D g 0 co N O O o N o V 0 <0 0- ' T r F o o 7 d 0i of J o O O CD o ai O N o CV O CD O m co o V a 0 r) 0) 0 `. C 0 N N 0 0) 0 v n o N 0 N a Z N fr. C) C) m a a ce a O N N 0 N 0 0 <D J N 1` CO CO J o) 0) m Ci O O r CD = M rD 7 7 R <o m 0 CO i' CO 0 CO- Vi 2 ri < cO <o 0 cn C ri cO (- ri <o co ui 0 c• . m 2 .. S m O• m O1 C N G on. cn33o a " N O o O O 0 0 O O 0 0 0 0 O 0 O 0 m 0 o n co cc -a W ,.� O O O O O O O O O Ncsi1 co coj m �W oo LLy o hg o �_ I"-: N: I- i 1 h v v u u I u, x x w 0 0 0 O 0 O O 0 0 m m Q Q d o 0 0 0 0 0 0 0 0 0 0 g0 r cN- Z O O O O O O O O O O O U N N Q a d d Y_ Y Q J 00 MI m 0 0 II N U) N a) 3 3 3 Y O O l0 N N N Z )p V N co M N CD CO 0 0 m CO 3 a M N N m .- N-NJ O CO O m a) m m 0 0) O a) 3— N N. CD O N m 0 0 m CO N O a m N N E C O O O O O m m a) m m m co- m m m m ID n n CD n C° m CO E a' c ) m m m co m co co co m co m d E G N m CO m m c0 m m CO m CD co C_ a d ro ro H W W V CO CO OO CD Nr 0 M 0) 0) COCO N- CO N m m MO O M 4 6 N m N 0) co.- N- 0 a N o ii co n n n CO CO 0) a) o) O O O 0O 5 cd co- co- m co co- co- co- CO 0) of S9 m m m CD m m CD m CD CD w m m rn 0) 0) 0) m 0) 0) 0) 0) 0 0) do 2 Z - N N N N N C)N N N N N N O N d C m N N hi d y � m m 'O O J N A O C 7 O M CO M W CO NI. n 0 = al •► O d d w N m O aO N R N M m M m N O U N co 0) O M N- CO co co co U co co m 0) O) m o O O O O i2 r d a r) M r) VI- c') of y I Y Y I N o 0 V 0C 2 W N 0 0 Q J F- 2 N 0 Wm o N m of N.: c O A R 0. N U in N CMD 00) N- )(N) v 3- 00)) r CO) m >" CO Ni N O CD O C ? CD ai N N N N M 0 a CD .7 0 h N CO- a. m 3 m m m CO- CO CO m m m m m co m c z 3 CO 0 Ot00 O N- O 0 v 0 (•r0O p a R m N c- N CD Ni m O O r' N N m CD N- v N- CO CO CO C v v N in N CO m m m m 0) O N CO- m CO- CO- CO- m m m m m m d E d z 0 0 0 N- v o 00 N- 0 N CO CO m N N 0) U) U) C CO m m o) O m N a m a N N 30 l] m (CO CO m 0 n CD r 7 U(0 d J J o Uo •E' O ''O O O O O O O O O O N N N N N N N N N N (n C a O O O O O O O O O O O 0o O fV M M M M M M M M M M M U M M M M M M M M M M M CO e E ..... 0) r v 0 0 Cl_ . m a) N N CO -A At n N V Q o �' m , 0 f _ Nmm CO- LO m co co COc co 0 NO „ N- mN: F Q a N N N N N N N N N . N N COCD >. ~O � o N 0 CN0 m Q O .- a a' 0 7 �fa m L L m m f 10 = N - - V ° - '7 co d O 2 co aD co ap co co 2 Z a a N- O co O O 0) N- O V O O co aN co O o) O O CO 0) O co yo co T O.- O M O O O N- O O J o 6O da) O R O O N CO 0 37 0 0 a Z m O O N N N CO CO v Y3 O C H 4 a F V 7 4- m 7 LL a a t, 4 a a, C C d -p =' 7 N N I- I y OF 0. 7 a - 0 C O) C ) N 77��IIuuTTaa1�C .� .. — C M d N 0o- u)) 3 3 a a U a H W a 1 ami 0 m `u� O O O s= 7 7 co co 2 S U) a' a' a a I z N N 0 O N- N- Z U N N < a) 0 Y Y O (0 (Q 0 a a a a 0 0) 03 O 0 0 _C V t 3 Q (0 co U E U) °r m m = E Nu 2 m ro H ., UJ 0 ai u .o c o 0 L w m m co 2Ct c o C c ai o la. 0 P. F, cP. g 1 0 g r. 0 U U) .2 ct °>— , 0 s 0 0 0 = A JF2zu) 0 a.. V i3 2o a a) Ce > a) O. co (0 0 a15 ...,a) J a m O) oa o 0) c 0 C E Y 2 as 2 a 0 a a a 12 3 a 1J- 0 ) > > > I N) x N O) > 2 N 2 u) ~ 0 UO 0 2 m > O Ul > 0 I— H U) > (.0 CO N H H H 1/) 0 N O ao N D CO O in U) D 1— U) I— a m O O 0 0 0 o 0 0 0 0 CD 0 0 0 00 0 0 0 0 0 CO 0 0 0 Q N In U) U) (1) U) (n N UI N N 1n LO U) U) UI U) N N U] N U) (n LO U) o t co N- N O 0) a0 Ni ci Ni 7 a0 m V' V' (O co 00 N) O) a0 m 2 t fci N. O W (o 8 W V' O (0 3 7 2 O R do N f8 O 00 N ...7; (O (n p,y (O N O N O O) (D N OD lO 1n N f� (O P. V O (O (O N O M )O m 0 .=.. m m co (O v CO 00 N- CO CO CO N- CO (O CO CO v CO N. OD CO U) CO CO (ID Q a CO T ~O � E▪ CO CO N- CO CO 70 U) N- CO 07 0) O N- N V' M N- N O (O CO O N CO OD a s I D 0) V O co N 0) CO O CO N CO CO CO U) 0) N- V; CO r N CO O) O O m Q 00 ` t N� O) . W 0) U) N O 00 Ni ,. m O M N Na;4 O) N 0) L L U) m E CO CO N- 00 N N N N- 0) CO 0) (0 V' V' N- N U) V' CO U) N N 0) € -O 0 7- y y) N V' N CO h N 0) r N U) 0) O 0) U) CO O N- CO U) CO N- N N O (O o 2 m OD m 0 0 .�.. v M M co- V co- N) N) V' N) N) Ni N) 0) Ti V' U) N) N) N) N- NI N) M Z a a : Cl.. co 0 Q o 17) c u; iii..j 0 o u . .2 c m E 2 0+ 0 0 o . 0 N (3am330 LL cv H io- 1 W cO IW os s ▪ Vrr x x CO CO ce a a a a O N N Z Q C) C) Y Y 0 co to o aa n: CL N N N to 7 7 7 Y O O f0 to u) LOZ l0 V V 7 Q CD (D U E °r m m 7 Et ) c 2 °r °r 1- 2 w hi o ii c 0 a IX N C 0 c hi w A :a c S d u E. c m V O • T 2 -J1- gz° iO0 r O 0_ 1 N 0 0 0 0 0>• o a u) V N O O u) O CD co n N 10D o v-i V el ) o N uj 0 v V N Q .) to O CO n O CO CO r, O p 1� ry CO (0 N. O- V ,- O V W , Oi m N 0 0 0 o 1° o o o m � a v u u 0 2 L V c o L N 2 .0 0 0 CD O a) .c 6 00 00 O 0 rte,' O N 00 n o 00 N C O CO p U) 00 CO 0 U) CD U) c.j U) V CV a J J J J J J m E N o m O N N O N O el Q icon a E a r r r r r r r r r r r r r m m 0 a 0 CO CO CO CO CO CO m CO CO CO CO CO CO 0 a V H Y CO U) U) U) U) U) U) U) U) U) (1) U) U) I- 0) M co v) CD N. CO CO u) MM co V 1D O CD u) 1- M V V V u) CD OD CO 10 0) V OCD . ui CD CD Ni CO 0) ODD COOC0O 1` CO O 00)) CO aO CC)) CO C7 CD 0) CO O V N v) CD N. O 0 W 7 N N C') C) 1'; C m + — W C 9 O O (..) O) Of Cr V N N- 0) N V CO O) M n j0 O 1- 0 O CD V N CO O 0 V u) CO N- CO 8 N N N O N O h N O O N- M CD c 0) M N- 0) (0 CD M O CD N- c0 O 1D J W e N. o) 0) v_ CD u) N- CD m o CD N N M M V co- n n CD CO co - + - a an N- N 0) V V O O CD O O CO O CD u) O 0 0) V M M CD N DI LO LO 10 O 10 N- V DO N To t M CD lO 0) O N CD CD V V (0 V h CD V V U) V Ill v g N- 0) CO N .- 1- CD CD N CO N. CO O V • N in 0 1D 1D 0 s- lO o) O) O V c- CO ,- M N.- N. cm E Q d > N N N N V V V u) CD CD N. n CD CD CD CO CD I CD m co a cou) O 0 0 O O 0 0 0) V V u) 1D V V CO E oO 1D 1D 1D 1C) 1O D CO1D 1CD CO N- N- IV N (D U) m m 2, t V CD N u) N N u) u) N- O O O) 1- O u) 1i .c -c Or - ,- 7 a.f 0 N (N-O D M M M M N M) 1I-D m VM Vn V a Z R• c0 CO 03 CO 0 (V N N N a V u) co- CO co- 6) M M M V V r r C 1 co O O Q a O I.i1 * C tri C0 C7CV 1G O a (n33o a a • ul W i•no_ nil 0 a= m co t 0 a >+ J a) a I m ca CO .- a L N CU WE Y. a Q m m C N T 7 mt L cn m T15 Z aEl? c") O° m CCI N Yf io- W a Z = z � o n CO Mili _ °I rr) , u) 1 Lc) W a 0 N ^ z 0 N N Q it) It) 1 O a a 0 a° ti a a 0 d 7 Y k) 8 1 I O O l0 0 d d N V V Z Q d U 1' (0 (D 0 3 a' U • E LI©� m —y o u1 d d O1 a m en 7 a' V) 3 d d 9 H ^2 W d w a c ? 0I 7 ET m J J 0 d > O0 c = O ry O J J (7 w td rn I d 2 C Z bC co R co d V m > ? m (0 ` V ai LL 0) Q W W 0 N N m C O w a1 V W7 7 ✓ ate' m m a E .- v o m 0 Wco• >> o O ftp N ftp m �. C in W (O f0 `a p o u, o . 0; m (0 O (Y O N d > 1 0 CI) N ui C Q C _C. a O L mC m (0 0 a3 yam.. O c O 0 O W '152 cci N N a. 7 0) 03 d cu I O> C fi 0 N C C C L .2 z W CO t N d C o_ Z W 3 m (n E o a Z In+ a• o z 0_ v > 1 ',. O a) N_ m I TO W I o 'n o d d x c a A o E 0. E o D 7 V] O N N a m- U = nl- N mal N L _ 07 Z 7 7 7 m a X 0 L O O O 0 w 0 o 0 o N a mN O o 0 0 0 o a m a) m U 11 ao o ao I a( o co 1 m to 2 i l Im Q o C Q a 7Z0v (a Z d ! 03 N ` dE m ro Itmro Vm d - 0 � a dN N a O 0,• .3,2 co o ra i w o m m _ + L • v za aoo — ao C c 2 a O N .� d E c r a) d m 5, ui « dFc 0 d u 0 W et IC> i o m rn d mor° a° « a° .) rn ? v o E• P r d m m R d a o .o m d p m a m ts a�`i m )11 0a. m33o a 2 o2 1 m co u_ a 3 3 a 3 2 o 4 > > a � N N CO0- H 0 N v COm v N- 0 N co 0 co M V O 0 W O O O O O 't �N N� a '_ N In aO N ' m NM MI \I Ili d bag 00 LL O O g= vv y _ = a w w o 0 0 0 m m m m co m m m Q Q d 0 m N O N N z O of co a0 r-: r N- n r t` t` U N N Q a 7 . - a J C m m 0 o CL a CY ` m a 3 7 s Y �I,I O O a) N tO Z (a f� In CD V V I- N m CD CD N N Q m V a] N N f. M CC) N O a0 m CD m f� M N N V m 0 IO O 0 V V CO N-N 0 CD V I. V 0 E. E ti c _ _ 0 0 0 o a) 01 01 CO ao ao a0 m m a0 m aD N-- a) a) r ar° CO CO Q_ C C m m m CO CO CO CO m CO CO m CO 2 CU E g m CD CD CO CD m CD CD CO CO CD CD c_ O CO CU 5- CO I `2 ui•W CD n M O co co m V W N co CD O N V 0 O) O) m 0) (D m0) QS N a') a7 M N M m n▪ m O ,_ co V N. .- N. 0 co IO o i:i co co CO a0 I. N- N N- CO CO 0) 0) 0) C O C CO- m m m CO- CO- CO- ao CO- CO- 00 ao t CO CD m m m m m CD CO m CD CD .� a m 0) 0) 0 0) 0) 0) 0) 0) 0) CO K tu Z ui co. cc; co- n LO- LO- ui vi U) ui m Sc C V 0 C co O O IO a1 M M ,- a) co co Cl) t` M 0 0) 'O C C m� V N N •Y C 0) CD co 0) m IO M CO m O 4 F al o .2 M m m m If) M (. .- N M ni U w m m 0N > > N c V V co m m 0) V V m c c m m co m m m 0) 0) o o O - m f >,. a E E m o (0o 0 of of a; co- of c6- vi c- Y v Y O 7 as U U c 2 d d = J r- 2 2 V) 0 0 0 7, 8 2 `o 0 'C '6 a) 2 o + o 0 0 = 2) 2, 6-cc re rt cc 4)D. O a a m lL lL u. — - Q' * E E i0 + + + + v a V r N 0) m co 0 CD N T V > > O O o O CO V7 M 0)W0) lO • co co m O) C. s- CO .- ai ofcc; of m ma; N 0 o a> > 3 � m O) M I- r O M O 0 CO CO 02 2 2 N N N CO CO V V V Q. V) y Q37' 0 co- CO CO- m m m m 00 co- m m CO c Z (0 0- jm m O N O V 0 O a0 0 V CD m co O O N O n N O 0) O a/) 2 a) ui 0) 0) v N N � n co N4 a) O N IO m m 47 N- a) 0 Q) m d . Q' d' Q' 2' co V V V V V V co co U) IO CDto ZV) m U L.L. tL tL tL Q H m m m m m m m m ao eo CO- m coa 2207777 D D 8 U U } g 7 coI- o m O N 0 V 0 IO IO Co V CD ✓ m IO N IO r a7 N O N V IO ✓ a) M V m m m m N O N- a0 CD CD mW N V N. O CD N V I ✓ V V V a7 IO IO co CO ID m m Zp m m Do au CO- 0_ au au ao ao m m m O 0 0 0 0 0 2 .‘: aa 'a 'aa ao m m m m m V) ao m m m ao 0 m 0 O .4- co In m CD CD 0 V m 0 O N N- V co m co a7 O 4 CO O IO N 1f) 1f) IO r" O m m I� V M I` N a) m IO 0 0 0 0 0 Qo co N N N N N N r- O 0 0 0_ 0_ O_ a s r M M M M M M M M M M co co U IIIIIN E , m .- 0_ 0_ 0_ 0_ 11 .N N m N mC0ImImImImI Q N Z z 0) N 7 3 CO aD aD a0 CO CO r a` m CO M CO V 0 N CO m O N 0) CO LC) CO V m N 0) O Q IO O O O O m Cl)0 M LO co m • m O) V r a7 V7 Cl) V7 In u) In CD CD CD I- N- O N O O O 0) m N m V V o 0 0 W V n �p a) N- o 0 V CO 0 u .. O o U a d .. O g_'' m CD co V m V C r CO 0 N N CO- M a) O d Ir I ~ a O O -o O co O 2 m co co ao E co nno Z Cl. d R CD vol 0 ID LC) 0 0 0) m o N m CO 0 D o n o m CC) rn o v, 0) o n o 0 0 o CD aO N N-cri O O V m i,I T O O V N J IO 0 m O 0 0) O h CO ON CD m ,- M V CO m m 0 N V p m 0 CO 0 0 V 0 M O m W Cn m m O O N N CO M O �- O N N M Ci .- .- el- 0- M M N M M CO V V I_ V V V m V V41 C dl H u_ 1:5 22 .m0. Y co V) N N F CO V 0 m V — C T m d d fa- E c N O O r d d y j m O 0. ) 3 3 0 co 0. N • y O O 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 O O O O 0 0 CD O 0 I C0 0 1 U W 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I rn rn rn rn rn CA CA Cn Cl) rn Cn rn CD CD m gli �W d —� , .-- d 111114g vv I-I- oco g= II II CO CO _ _ Q CL d' CO CO m CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O Q Q a .0 (0 U) in 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O m 0 of °o 6ei ri ai vi 6 of 6 6 6 ri of o 0 0 o 6 6o U N N Q N d d V Y Y 0 J00 m (0 0 0 O- CL a W a V) N N (0 7 D = Y O O ' W !' N O ) rn _ ) uNO COV) V) m Ni Ni3QN Mm co ur m r V m V 0) NI. N V) m CO M O NI. V N- m m M o M V u'i fm u) u) 1fu uVu) O vN v(p CD U C N M V) m N- m rn 0) O O O O 0 N- 0 CD O M O M O E N m co N- N- m l0 C M N .- .- O 0) CO N- CD CD U V M M N N CO CO CO E d' C n CO n r` r n 1"--- n N: n C co (O m m CO- CO- CO- m m m m m COm CO CO co co co co co co co co co CO CO m CO m CO m m CO co •- •- d E ) '" m m m CD CD m m m m m m m m CD CD CD CD m mCD CD CD CD 73— 0 m °r °r F 2 lL )y .� V O V M C O CO CO m rn N O) r N V co 10 N. m N O 7 , O) U) co M O CD M CO M 0) M (n m V) 0) u) M N- CO O co 0 m Nul ul O O vi (O N N- n N N6 V 10 vi N V N Ci co co V co a) V' 0) M m O) N R M CO n n N. N. N- N. h N- N- 0 C co- m rn rn rn m O) 0I 0) O) 0) rn rn rn rn rn CO 0i O) 0) 0) O) O) w t �' co m m m CO CO CO CO CO CO m CD CD m CO CD CO CO m CO m CO m 7 O) 0) 0) 0) 0) CD CD 0) CD 0) 0) CI) 0) 0) 0) CD 0) 0) 0) 0) O) O) rn r ! Z In lA In In In U'l In In (n lA l0 In lA u7 Il) �fl U] (ci to Y7 In (fl () d C C d V R 'p C V d 7 m N V rn m N- U) CO CO M N V) V M C C CO N N V CD y C m N- CD O O Q I� M O rn rn CO m m V CO 9 m e m 6 N N ai V m O O ri n M O 0) co Oo Vi N- N- ri h n O d V to co co V m N O 0) m N- N- N- m m m 0) m m m 7 m a CD U Q' T — N N M C V) V) 0 n CO 0) 0 .- N N M a V) m m N- n in t10 O �1 2 (.4 at I Y q I I I `t -f vf v) v) u) u) v) (n v) u) ui v) u) J I- a 2 to 0 W O d a) Ce M N N. CO O N. O in .- N- N CO NO n CO 0) V] N O O O N- CO T M (O V r- (O R CO V M N N 0) N 0) O V) O) M CO. V) u) O O I` V u) n O) m rn N- O m m m O N u) 0I N N N N- rn u) m O u) CD NI. CO N V N- CO CD O .- -- .- .- N N N N NI"_ v_ (n u) (D (D r N F- CO CO CO CO 0) 0) 0) 0) 0) 01 CD 0) 0) 0) d y m co m m m of co- O(i m m 0 m m co- co- m co- co- co- m co- co- m CO c Z = N 0- N O N- M O 0000 O O O O O O O O O O O O CD CD O O M V) O O O O O 00000 000 O O O O O O O a. N m rn O O O O O O O O O O O O O O O O O O O O N M co M co co co co co co co co co co co co M M co co co d CO co co co m m co m m m m CO m CO m m CO CD m m m m m m 0) N m m m m CO- CO- m COCOCO- CO- CO- CO- m co- co- co- co- co- co- co- co- co- 0 c I O NM O CD CD CD O O O O O O O O CD O O O O O 0 O co m O N u) u) u) u) N u) v) u) u) u) u) in u) N u) LO u) u) CO m N 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) N- m o) rn rn rn co 0) 0) 0) 0) 0) 0) 0) CD 0) .4: 0) 0) 0) rn rn rn CO m m m CD CO CO CO (O (OCD (D CD CD m CO CO (O (O (O (O (O 0 CO- m m a0 CO- m CO- m m CO- m CO CO CO OO OD m m m m m m m d O O CD O u) u) u) u) N V] u) u) v) u) u) C V V C V m V) u) O O O 0 I-- N- N- N- N- N- N- n N- N- N- 0) O) O) 0) 0) 0) rn u) u) u) u) N Oi m t+i O6 Vi N co m .0 O O O O O 0) 0) 0) CI) CO m °o n N- n n N- N- N n N m m M M M M CININN NNNNN NOIN N N N N N N N E N ° m 'N Q g rn CO O 0 0 0 0 0 0 CD CD CD CD O CD m 0 0 CD 0 0 00 M CD m M m O o O O O O O O O O 0 o O o O O O O O o 0 Q (o O r--: O O O O O O O O O O O O O N O O O O O 0 w 0 N- n m rn rn rn rn rn rn O) O) 0) O) rn 0) co ,- rn rn rn rn rn rn M rn o I- p A U >. N O CO O coo co D v o CO o COCD c _ a rn E °r° co m L L U co coI O mi 9 ~ O 0 o p O m OD DD 0 t o 0 Z if tL u) O O co (ti O O O O O O O O O O O N 000 ON MOO OCD 2 M 00 0) N 0 0 0 0 0 0 0 0 0 O o .- . O O 00 N O (C1 o 0 O T 6o o V J O O o O O 0 O CJ o o O W O o 0 7 J O M IS O N d m O 0 N 0 O 0 0 0 0 0 0 0 0 O O N (y O 0 O N. 0 0 n N O a t ' V) V) m N m 0) O .- N M ' V) m m h m 0) O) O O Ul T I v (nurn uuvvvvu) muo0 ° d d 0 O.) 3 3 0 a y0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 co W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .'S m CAI s s 4) g LL O f� i- U) .- .-i7 V II II a) 2 = a' a' O O O O O o O O 0 0 0 0 0 0 0 0 0 0 o 0 0 0 O 0 O 0 0 0. Q Q d 0 0 0 0 0 0 0 0 0 0 Cr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NN 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N Q d d N 1' Y Y 0 J0 LO LO O 0r. a a a a N a) f0 > > 3 Y U) N l0 Lp CO M CO V V `Cr Cr Cr LO LO N U) m CD m m IN N. IN IN N. CO CO m CO CO 0) V 4 7 Q r m O O ,- N CO Cr- LO m IN CO O 0 ,- N CO Q LO m IN CO 0) Co - N CO CD m i U) U) If) m m m6 m6 co m m m I� N- I- I` I` N- n n I` I- m m m m 0 0 0 O 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 E NO 0) co N. CD LO Cr CO N ,- 0 0) CO IN CD N "Cr CO N n- o 0) CO I. m m CD co co- co- N Ln co- co- Ln U) LO LO .. Ti Q V V V V C) C) C) M M CO m 3 a' C C' m m m m m m m m m m m m m m m m m m m m m m m m m m m w E . N la m CD m m m m CO m m m m CD m CD m m m m m CD m CD m CD m CD CD 'E _o A V. H W W LO m m N. CO 0) 0) O N N C) V 0 LO m N. CO CO 0) 0 N CO V V V 0 CO N m V 0 I- C) 0) N IN CO CO U) I� CO O) m N CO `Cr 0 m N m V 0) U) O m N I- C) m V O N m N m C) 0) C o m N- C) m 7 G) m m M) LO N V sr CO CO N N N c- ,- 0 0 W 0) CO CO m N. I` m m LO N V .jj O) C) C) C) C) C) C) C) C) C) C) C) C) C) C) C) co N N N N N N N N N N N C O C O) 0) 0i0 0 0f 0) 0i 0) 0f 0) 0) O 0) Oi 0I 0f 0) 0) 0) 0) 0) O. 0f 0) 0) O) P. t t gm m m m m m m m m m m m m m m woo cow m m m m m m m N t 7 W Cr) 0 O) 0) W 0) 0 W 01 0) 0) 0) o 0) 0) 0) 0) 0) 0) O) 0) ) 0) O) O) 0) a) 2 ZO '� 6 vi U) U) U) 6 Lc) 6 u) U) v) 6 66 vi vi 6 u) 6 U) U) U) U) u- v) Ln 6" d C O C d V A 0 u y 7 0) IN LO V N 0 0) N- N sr N 0 CO N- 0 C) N 0 CO IN LO CO N O m IN v) C C V n IN I` N r N- m m CD LD m m U) U) U) Ln LO LD V V V V V' V' C) CO CO 1:1G 2 d w A I. r r n r N- N ri n n N r ri ri N ri ri ri N r n IN r r n ri IN 0 wy d (-) W m m m m m m m m m m m m m m m m m CD m m m m m m m m m o d w m , N co 0) 0 `- N C) K LO m N. CO 0) O N- N CO V LO m N. CO 0) o N- N CO a' d d a LO L;) a3 LD LO LD La- LD tD 9 (Q 9 n n n I; Ni a0 °? a0 0) c0 3201 22 .1g 0 ZS Wga r1 2 to O 0- 0 Ce LO N- sr 0 N- C) W m N m 0 N- V 0 N- C) 0) co N co co IN 7 0 T N V U) IN 0) o N C) U) IN CO COU - COo N ) IO ,- CO LO m CO o s- CO U) O co co R N ,- m I` L() C) O o:; m4 NO Oi n U) C) O) LU m4 N CD CD N r- O O 0 0 0 0 0) 0) 0) 0) 0) CO CO CO CO CO I- IN N- I` N 0) 0) 0) 0) 0) 0) 0) 0) 0) Cr) O) 0) CO CO CO m CO CO CO CO CO CO m CO m m CO a y y CO- CO- CO CO- m co- co- m m m m m m m m co- m m m m co- co- co- m co- co- co- ca m C Z .�. co N O O O O O o O O O O O O O O O O o O O O O O O O O O O o O o O o o O O O o O O O O o o O o O O O o 0 0 0 0 0 Q_ O O o O O O O O o o O o 0 0 0 o O O O O O o O o 0 0 0 co co co C) C) CO CO C) C) C) C) CO CI CO C) CO C) CO C) CO C) CO CO CO C) CO CO co CO CD CD m m m m m m m m CD CD CD CD CD CD m m m CD m CD m m m m m m (4 CO- m m m m m CO- m CO- CO- CO- CO- CO m m CO- m m m m m m m m CO- CO- m a CO h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LO LO U) N U) LO LO LO LO LO U) U) U) U) U) N N N LO N LO LO U) LO U7 Lf) U7 d) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0)0 0) 0) 0) 0) 0) 0) 0) 0) CD co LD CD CD CD LD CD CD CD CD Lo Lo CD CD co LD CD co LD CO CD Lo LD cD co CD LD 0 �_'' m m c0 cci c0 co- m m m co- co- co- co co- co- co- co m m co- m m LV Lb m m co- 2 N U) U) U) U) U) LO LO U) U) U) m LI) U) N U) U) LO U) LO U) LO U) U) LO LO U) LO C) 0 0) 0) 0) 0) 0) CO 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) . CO CO CO m m m m m m m m m m m m m m m m m m m m m m m m t CD N CD CD CD N N N CD N N N N CD N CD N N N N CD N CD N N N N NNNNN NNNNN NNNNN NNNNN NNNN N NN a L— m •q a Cl) 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O o 0 0 0 0 0 0 0 0 o O O O o O o 0 0 0 0 o O o O o o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) CO 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) CO N_ s > a v CD m C m < O E O m m O 2 m co cp cp Z a a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o ao T 0 O O O O O O O O O O O O O O O O O O O6 O O O O O O N d 0 CD O CD O 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a t N CO Cr U) m CO CO O N CO Cr U) m co O) o N CO `Cr LO CO CO O 0 .Q c 0 e co- LO m LO LO LD LD U) n N N- r r N- n N- N.- h W co- UD co- m c0 co- LA c0 c2 2et 0 a y I cN N c°.) a cn 3 3 c I a ■ W 0 0 0 0 0 0 0 0 0 0 O 1 o 0 o O o 0 0 0 0 o j m `Wdi o' o o o V v 0 II II CO _ = a CCC ! 0 0 0 0 0 0 0 0 0 0 0_ Q Q .- o O N N N O O O O O O N N Z o o C) ci C) o 0 0 0 0 U N N < w d d g 7 Y Y 0 J CO CO 0 0 O a 0 c N W N f0 O• O6 V! CO M OD 0 0 0) O ✓ V Q V O CD 0) 0 O O O O co CO 0 3 i 0 v 0 GO t1D O 0 .- N 0 ECO O) 0 M 0 N 0 0 0) CO0 OD CO CO E IL' ... M c„.,- ..E M M NI- OD M N").- CO M N N �' 0 0 0 0 0 CO 0 CO CO d E N CO (D CD CD ID CD CD CD CO CD CD C a m H 2 W W O0 OD e7 a O t )) n 0 0^7 0 N- O) C0 U) OD 0 v N OD N G> R v v V' M M CO CO N N t) 1:1 O) N N N N N N N N N N m o {c O) O) D) O) O CO O CO- 0) O) L (5 CD CD CD CD CD CD CD 0 CD CD w E O O O 0) CO 0) 0) O O 0) a) 3 LZ .�.. lD If) LD ID tri 1f) N In N U) N O N R m C d e- 0 N cocsi c m u m OE .E 'O C V m 7 M M O V CD 0 4 S CO C d Cm O M O M O N v w G 1 m .. N- O N- N- O 0 0 )O v O O w d U y) N 0 0 1"-- 0 0 O 0)0) CD O U m L m a aD CO- CO- m OD- au aD COa) O o o v) t) 0 Q Z y O O N J r2 Z u) 0 W �' C m 4 O 0 v r: of 0 A 0 �. a CDU G Ce N. 0 m 0 m COro r' U)CD 'or v >• o o aD N- vi U) v Oo U) N- h 0 0 0 C 0 C CD CD OD ODOD CO CO CO OD CO OD CO o. N q co- co- OD 0 aD m CO- CO- CO- CO - CO C Z m Q a) 0 0CD vii. CO 0 m N 0 co co co N N co• 0 0 00) COD COD m m co CO 0 0 0 0 0 U) 0 0 O) 0 0 0 0 0 0 0 0 0 OD O a m E A z 0 0 0 )D )a n o 0 0 o lO lD O M N 0 N N 0 V v M 0 0 M V a) to I. O O O CO f� 0 0 V R 0 0 0 0 0 0 0 0 0 0 j O 0 0 0 0 0 CO- 0 CO- CO CO 0) C 7 d N oU 8 0) L.0) 0) CO N 0) 0) Y7 0 In O O O O O O O O O C 0 OD OD 0 OD OD OD OD OD OD (V O Z. co CO CD CD CD CD N CD N CD !� 0 U) E _ v i- O N O O O d �° N 0 co co 'N _ 4 6 n 4 cmi g.Q= 3 0 0 G o .- OO CO- N CO 0 0 N N 0 C N N 2 0 0 0 ! > C 0 O co co 0 O O O O o O O N N 0 0 0 O 0 0 OD Q O O co O O O O 0 co O O N co N M CO '' 0 0 0 C COU > O 10 NM 0 0. C � p O1 Oa cri p d CO E mW I 0 m O §.e (NE.• L J) m .- R d z O_ N O U. NI -v "O U) OMO O 2 co OD 01, a0 coN O M _' L o Z O_ 0_ 0 CDD 0 0 0 N r, 0 v0) )' O O co0O a >d O M J O O M O N O O D 000OCD ON MOa ! N CL Z 0) 0 — CO V 2 O C 7 00t O O O t O O t OOO A 5. il; ' 21, C d NUUa 0• m aO C . o d N ° . c COw 0 N C.) a. n33o 0. U a I W m cn EW o o o o NI'• NI II II I I ix ix a a a a a N- I Z 0 N N Q CT) d a) N 0 0_ CL a a c) N N a1 3 3 3 Y O ON CO 0 Z 0 V V 3 Q E 00 m m 3 a' Ti - °• r °r1.— w hi u .o c O P. .c w m ct c a) ° c 2 hi u u m a v m e u C g °.. 9 d ` m ci d o U y w a - a . L d d g agt> o U o c O Q. O a ❑ Ce 2 O ❑ >+ N CD W 4) ca (D Z v O h O h n N Q. h O O N O 0 O C) CD COCO t6 . 6 (06 . o . • O r a m W eo O 0 0 0 f0 0 '00 o N 0_ L H H H m H O H v '6 0 .0 0 N J W N 0 L O O U) a L M li h c0 co a, co O co m J O csj h O0 CO h 0_ J06 m E ❑ ❑ ❑ c) ❑ N ❑ m rn �I. 0 0 m m m m m m m m m a a U Y (n U) v) U) Cl) U) U) U) U) I— U) U) C) 0) W < V CO V C) U, D) 0) W m R D) N V C) a0 N R (D O O c0 m e av (D N N) v v O CN) (O W 7 (') v t u) v) (D CD CD aD Di a) d c E f. co 0 2 O VLo .— CO O O h (D V V '7 H N COC) O) h O COID O CO O V '.i a C) — O) ID O .— N O N V JG N N N N CD N N I"- O CDD CD lD co Wco co co co co- coO) N c0 IA co- c0 co- m co- a0 co (n LL m w c07 m + ... N O N N m F I— Q_ CO O O O O O O in in in 0 uo co N CD 0 0 0 0 0 N 0 0 a0 (O C) (O ca O 4 N (D U) (n (D In 1D C) 1D 1n (dj L Lei h c0 N .40 la .c V 4 c0 4 <f Q 4 4 c6 V C Q ; Q 3 00 OD CO CO COW E a 3 v v CD CD_ CCD CD D (OD (OD CD m (OD CO > N N U T •`dm °' c°,— .- M h C O CD CD CD CD N N 0 0 O Ir) E dI 9 W 0) 0) W 0 (D CD t` Irl C] D T V (D N O .c a .— m m y W W C') ON1 O CD N 7 L Q' COD V N N r (`ca M') (ea ND O O E m c0 CD c0 co 0 ,tea, co C co V C) (y0 7 C) co- C) ID (D W O OI N Z a a d 0 "" 1!] lD co- co- co- W co - Z O N C. o O c V 0 C .0aI E d _ °f -I- G (.)• a33a Cl. a 4111 by North America - ALASKA - BP Prudhoe Bay PB DS 18 18-11 18-11B 18-11B WP12 Anticollision Summary Report 25 February, 2014 Milli BAKER HUGHES • BP ra - 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Coordinate Reference: Well 18-11 Project: Prudhoe Bay ND Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Reference Site: PB DS 18 MD Reference: 18-11B©64.50usft(Parker 272(ARH=47.10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 18-11B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 18-11 B_WP12 Offset ND Reference: Offset Datum Reference 18-11 B WP12 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 13,889.96 to 19,405.35usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 2,135.68usft Error Surface: Elliptical Conic Survey Tool Program Date 2/25/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 57.50 2,654.05 Survey#1 GCT Gyro MS(18-11 DPN) GCT-MS Schlumberger GCT multishot 2,654.05 2,674.50 18-11 B_PB1_WP05(18-11 B Pilot) GCT-MS Schlumberger GCT multishot 2,675.50 3,100.00 18-11 B_PB1_WP05(18-11 B Pilot) GYD-GC-SS Gyrodata gyro single shots 3,100.00 3,300.00 18-11 B_PB1_WP05(18-11B Pilot) MWD+IFR MWD+IFR correction 3,300.00 13,440.00 18-11 B_PB1_WP05(18-11B Pilot) MWD+IFR+MS MWD+IFR+Multi Station 13,440.00 13,889.96 18-11 B_PB1_WP05(18-118 Pilot) MWD+IFR MWD+IFR correction 13,889.96 19,404.90 18-11B_WP12(18-11B) MWD+IFR+MS MWD+IFR+Multi Station 2/25/2014 5:02:09PM Page 2 of 4 COMPASS 5000.1 Build 61 • 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.50usft(Parker 272(ARK=47.10)) Reference Site: PB DS 18 MD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 18-11B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 18-11 B_WP12 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) Lis DS 01 L1-01-L1-01-L1-01 14,307.99 11,250.00 449.34 280.50 182.81 Pass-Major Risk L1-01-Plan#119 L1-01A-Plan#119 14,307.99 11,250.00 449.34 280.71 182.59 Pass-Major Risk L1-09-L1-09-L1-09 18,076.50 12,625.00 1,078.51 285.42 839.22 Pass-Major Risk Lis DS 02 L2-25-L2-25-L2-25 Out of range NGI NGI-01-NGI-01-NGI-01 Out of range NGI-03-NGI-03-NGI-03 17,483.33 9,550.00 541.49 504.51 39.98 Pass-Major Risk NGI-08-NGI-08-NGI-08 Out of range PB DS 18 18-04-18-04D Plan-18-04D WP 03 Out of range 18-05-18-05-18-05 Out of range 18-05-18-05A-18-05A Out of range 18-05-18-05A-18-05A wp07 Out of range 18-07-18-07-18-07 Out of range 18-07-18-07A-18-07A Out of range 18-07-18-07APB1-18-07APB1 Out of range 18-07-18-07APB2-18-07APB2 Out of range 18-07-18-07B-Plan 4 Out of range 18-09-18-09-18-09 Out of range 18-09-18-09A-18-09A Out of range 18-09-18-09B-18-09B Out of range 18-09-Plan 18-09C-Plan 2 Out of range 18-09-Plan 18-09CPB1-Plan 2 Out of range 18-10-18-10-18-10 Out of range 18-10-18-10A-18-10A 17,873.14 13,780.00 2,084.11 1,168.24 923.81 Pass-Major Risk 18-10-18-10APB1-18-10APB1 Out of range 18-10-18-10APB2-18-10APB2 Out of range 18-10-18-10B-18-10B 17,017.69 14,107.00 1,807.13 1,151.60 661.74 Pass-Major Risk 18-10-18-10C-18-10C Out of range 18-10-18-10CPB1-18-10CPB1 Out of range 18-11- 18-11B Pilot-18-11B_PB1_WP05 13,900.00 13,900.00 0.07 0.64 -0.53 FAIL-Major Risk 18-12-18-12C Contingency-18-12C Contingency Out of range 18-27-18-27A-18-27A Out of range 18-27-18-27B-18-27B Out of range 18-27-Plan 18-27E DO NOT USE-Plan 18-27E Out of range WGI WGI-05-WGI-05-WGI-05 17,089.11 8,700.00 1,834.45 166.80 1,667.64 Pass-Major Risk 2/25/2014 5:02:09PM Page 3 of 4 COMPASS 5000.1 Build 61 BP ra- I)bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Reference Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 18-11 B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 18-11B_WP12 Offset TVD Reference: Offset Datum Reference Depths are relative to 18-11 B @ 64.50usft(Parker 272 Coordinates are relative to:18-11 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.00 W° Grid Convergence at Surface is: 1.47° Ladder Plot 1 2200- I i 4 I I I I 1 1 C 1 Z I !LEGEND ( 1650- 1 y v: o ♦4 18-09,18'96,18-09B V3 , -+0-4 8-21,18-2 ,18-21 V1 Li, • -O A,PI`n#119 V2 - $ 18-09,P.n18-09C,Plan 2V0 Le J -9- :21,18- A,18-21AVO 0 i o -*1118.09,PI•n18-09CP,31,PIan2V0 -�- i 11,18- 13118-21BVO V 5 `m -} 18-10,18t10,18-10V3 i,... -e- : =1,1:• 16118-21 B Plan 9 VO 7, V4 m 1100- - .4-' 1x1018 10A,18-10A W -II- 22,18-22,4 18-22A V1 07A1=031 V1 � 1810,18+10AP61,1810AP61 V1 IL E -0; 18-10,18-10APB2,18-10APB2 V1 -E• 18-23,18-23,18-23 V1 3, V3 U --418-10,18+10B,18-10B V6 - ---1-•-41- 1:23;18-231%18-23 - - i V' 14- 18-10,18100,18-100 VO „"' - 1:'24,18-24,18-24 V2 1 V6 $ 18 10,18 1 OCPB1,18-1 OCP61 VO 1: 4,18-24A,18-24A V • OdV8 550- ; -? 18_11,18.11BPibt,18-11B_PB1 VVP05V0 .S 1824,18-24AL1,18-24AL1V 18-11,18-11,18-11 V4 -Cc- 1824,18-24AL2,18-24AL2 V I 3 .1 V2 - _ J -* 18-11,1 11A,18-11AV0 J -0- 18724,18-246118-24B V6 3103V1 -_' 18-11,18 11DPN,18-11DPNV3 p 18-25,18-25,18-25 V1 3 08V2 I $ 18-12,1812,18-12 V1I II#/ - 18-25,18-25A,18-25AV1 0- __ 1R-121 12A IR-124 V1 / .- - 1R-�51R-2SAPR1 1R-25,1PR1V1 11 V1 0 3500 18-12, 68,18-12B V5 10500 140001 -f-11018-26,18-26 V1L1000 V) -B-- 18-12,18-12C,M22SUVred Depth(3500 usft/in) 18-26,18-26A,18-26A V4 2,V2 18-12,18-12C,18-12C WP 18 VO -e- 18-26,18-26APB1,18-26APB1 V2 1: .J -: • 16-12,18-1Z(.l.onnngency,18-12UuontngencyVu -A- 18-2b,16-2bAt'tS2,1B-LbAI'I2V2 2:VO 18-12,18-12C Contingency 18-12C Contingency WP 3.0 VO -9- 18-26,18-268,18-26B VO 12 VO -A- 18-13,18-13,18-13 VO 18-26,18-26PB1,18-26PB1 V1 1;02CPB1 VO 18-13,18-13A,18-13A VO 18-27,18-27,18-27 V1 V: --F-- 18-13,18-13B,18-13B VO 18-27,18-27A,18-27A V1 13 V1 -6- 18-13,18-13BPB1,18-13BPB1 VO 18-27,18-278,18-27B V1 3: V2 -4-- 18-13,18-13BPB2,18-13BPB2 Vo -0-- 18-27,18-27C,18-27C V7 13 VO 18-13,18-13BPB3,18-13BPB3 V0 $ 18-27,18-27D,18-27D V2 V. --- 18-13,18-13C,18-13CV0 -*- 18-27,18-27DPB1,18-27DPB1 V2 4 V1 18-13,18-13PB1,18-13PB1 VO -re- 18-27,18-27E,18-27E VO 4: V4 --X- 18-13,18-13PB2,18-13PB2 VO 18-27,18-27EPB1,18-27EPB1 VO 2/25/2014 5.'02:09PM Page 4 of 4 COMPASS 5000.1 Build 61 • bp North America - ALASKA - BP Prudhoe Bay PB DS 18 18-11 18-11B Pilot 18-11 B PB1 WP05 Anticollision Summary Report 25 February, 2014 rpu BAKER HUGHES • 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Reference Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Site Error: 0.O0usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.O0usft Output errors are at 1.00 sigma Reference Wellbore 18-11B Pilot Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 18-11 B_PB1_WP05 Offset TVD Reference: Offset Datum Reference 18-11 B PB1 WP05 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.O0usft Error Model: ISCWSA Depth Range: 2,654.05 to 14,415.63usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,636.71usft Error Surface: Elliptical Conic Survey Tool Program Date 2/25/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 57.50 2,654.05 Survey#1 GCT Gyro MS(18-11 DPN) GCT-MS Schlumberger GCT multishot 2,654.05 2,675.50 18-11 B_PB1_WP05(18-11 B Pilot) GCT-MS Schlumberger GCT multishot 2,675.50 3,100.00 18-11 B_PB1_WP05(18-11B Pilot) GYD-GC-SS Gyrodata gyro single shots 3,100.00 3,300.00 18-11 B_PB1_WP05(18-11 B Pilot) MWD+IFR MWD+IFR correction 3,300.00 13,440.00 18-11 B_PB1_WP05(18-11 B Pilot) MWD+IFR+MS MWD+IFR+Multi Station 13,440.00 14,415.03 18-11 B_PB1_WP05(18-11B Pilot) MWD+IFR MWD+IFR correction 2/25/2014 5:15:03PM Page 2 of 6 COMPASS 5000.1 Build 61 BP Ird" 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Reference Site: PB DS 18 MD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 18-11 B Pilot Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 18-11 B_PB1_WP05 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) Lis DS 01 L1-01-L1-01-L1-01 14,099.58 11,250.00 487.05 315.40 177.30 Pass-Major Risk L1-01-Plan#119 L1-01A-Plan#119 14,099.58 11,250.00 487.05 315.61 177.08 Pass-Major Risk Lis DS 02 L2-07-L2-07-L2-07 11,250.82 9,050.00 249.60 318.82 -55.39 FAIL-Major Risk L2-07-L2-07A-L2-07A 11,250.82 9,050.00 249.60 318.42 -55.01 FAIL-Major Risk L2-07-L2-07APB1-L2-07APB1 11,250.82 9,050.00 249.60 318.42 -55.01 FAIL-Major Risk L2-13-L2-13-L2-13 5,676.58 5,475.00 851.74 100.22 754.80 Pass-Major Risk L2-13-L2-13A-L2-13A 5,676.58 5,475.00 851.74 100.22 754.80 Pass-Major Risk L2-21-L2-21-L2-21 6,863.77 6,050.00 124.10 117.69 14.95 Pass-Major Risk L2-21-L2-21A-L2-21A 6,863.77 6,050.00 124.10 117.69 14.95 Pass-Major Risk L2-21-L2-21A-Plan#20d 6,863.77 6,050.00 124.10 117.69 14.95 Pass-Major Risk L2-25-L2-25-L2-25 8,725.68 7,175.00 856.66 180.78 720.87 Pass-Major Risk NGI NGI-01-NGI-01-NGI-01 Out of range PBDS18 18-01-18-01-18-01 3,230.56 3,225.00 492.27 52.42 439.83 Pass-Major Risk 18-01-18-01A-18-01A 3,230.56 3,225.00 492.27 52.42 439.83 Pass-Major Risk 18-02-18-02-18-02 3,333.98 3,275.00 501.99 52.44 449.57 Pass-Major Risk 18-02-18-02A-18-02A 3,333.49 3,275.00 501.98 52.42 449.57 Pass-Major Risk 18-02-18-02APB1-18-02APB1 3,333.49 3,275.00 501.98 52.42 449.57 Pass-Major Risk 18-02-18-02B-18-02B 3,333.98 3,275.00 501.99 52.26 449.74 Pass-Major Risk 18-02-18-02C-18-02C 4,100.00 4,150.00 376.25 65.97 314.90 Pass-Major Risk 18-02-18-02CPB1-18-02CPB1 4,100.00 4,150.00 376.25 65.97 314.90 Pass-Major Risk 18-03-18-03-18-03 3,410.29 3,325.00 519.64 45.77 474.03 Pass-Major Risk 18-03-18-03A-18-03A 3,410.80 3,325.00 519.64 45.66 474.14 Pass-Major Risk 18-03-18-03B-18-03B 3,411.34 3,325.00 519.65 45.56 474.25 Pass-Major Risk 18-03-18-03C-18-03C 3,411.34 3,325.00 519.65 45.67 474.15 Pass-Major Risk 18-04-18-04-18-04 2,689.80 2,675.00 798.90 38.90 760.58 Pass-Major Risk 18-04-18-04A-18-04A 2,689.80 2,675.00 798.90 38.90 760.58 Pass-Major Risk 18-04-18-04B-18-04B 2,654.41 2,650.00 795.01 38.18 757.37 Pass-Major Risk 18-04-18-04BPB1-18-04BPB1 2,654.41 2,650.00 795.01 38.29 757.26 Pass-Major Risk 18-04-18-04C-18-04C 2,654.41 2,650.00 795.01 38.55 757.00 Pass-Major Risk 18-04-18-04C-Plan 8 2,654.41 2,650.00 795.01 38.12 757.43 Pass-Major Risk 18-04-18-04D Plan-18-04D WP 03 2,683.12 2,675.00 796.92 38.78 758.70 Pass-Major Risk 18-05-18-05-18-05 2,692.65 2,725.00 1,107.95 57.27 1,060.51 Pass-Major Risk 18-05-18-05A-18-05A 2,694.86 2,725.00 1,109.02 57.46 1,061.47 Pass-Major Risk 18-05-18-05A-18-05A wp07 2,694.86 2,725.00 1,109.02 57.73 1,061.20 Pass-Major Risk 18-06-18-06-18-06 4,011.95 3,675.00 684.01 62.60 627.28 Pass-Major Risk 18-06-18-06A-18-06A 4,006.13 3,675.00 684.00 62.36 627.40 Pass-Major Risk 18-06-18-06B-18-06B 4,006.13 3,675.00 684.00 62.36 627.40 Pass-Major Risk 18-07-18-07-18-07 4,113.35 3,600.00 780.55 48.47 735.36 Pass-Major Risk 18-07-18-07A-18-07A 4,128.22 3,600.00 780.82 48.77 735.32 Pass-Major Risk 18-07-18-07APB1-18-07APB1 4,128.22 3,600.00 780.82 48.77 735.32 Pass-Major Risk 18-07-18-07APB2-18-07APB2 4,128.22 3,600.00 780.82 48.77 735.32 Pass-Major Risk 18-07-18-07B-Plan 4 4,113.35 3,600.00 780.55 48.30 735.53 Pass-Major Risk 18-08-18-08-18-08 4,265.39 3,625.00 861.66 57.07 808.67 Pass-Major Risk 18-08-18-08A-18-08A 4,284.07 3,650.00 862.12 57.44 808.67 Pass-Major Risk 18-08-18-08APB1-18-08APB1 4,284.07 3,650.00 862.12 57.44 808.67 Pass-Major Risk 18-08-18-08B-18-08B 4,284.07 3,650.00 862.12 57.44 808.67 Pass-Major Risk 18-08-18-08BPB1-18-08BPB1 4,284.07 3,650.00 862.12 57.44 808.67 Pass-Major Risk 18-09-18-09-18-09 2,686.07 2,700.00 1,376.90 54.88 1,322.81 Pass-Major Risk 2/25/2014 5:15:03PM Page 3 of 6 COMPASS 5000.1 Build 61 • 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Reference Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 18-11 B Pilot Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 18-11 B_PB1_WP05 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PBDS18 18-09-18-09A-18-09A 2,686.07 2,700.00 1,376.90 54.88 1,322.81 Pass-Major Risk 18-09-18-096-18-09B 2,686.07 2,700.00 1,376.90 54.88 1,322.81 Pass-Major Risk 18-09-Plan 18-09C-Plan 2 2,686.07 2,700.00 1,376.90 54.69 1,323.00 Pass-Major Risk 18-09-Plan 18-09CPB1-Plan 2 2,686.07 2,700.00 1,376.90 54.69 1,323.00 Pass-Major Risk 18-10-18-10-18-10 4,986.15 3,600.00 1,483.67 152.12 1,391.34 Pass-Major Risk 18-10-18-10A-18-10A 4,986.99 3,600.00 1,483.72 152.38 1,391.19 Pass-Major Risk 18-10-18-10APB1-18-10APB1 4,986.99 3,600.00 1,483.72 152.38 1,391.18 Pass-Major Risk 18-10-18-10APB2-18-10APB2 4,986.99 3,600.00 1,483.72 152.38 1,391.18 Pass-Major Risk 18-10-18-10B-18-10B 4,986.99 3,600.00 1,483.72 151.95 1,391.62 Pass-Major Risk 18-10-18-10C-18-10C 4,986.99 3,600.00 1,483.72 151.92 1,391.64 Pass-Major Risk 18-10-18-10CPB1-18-10CPB1 4,986.99 3,600.00 1,483.72 152.38 1,391.19 Pass-Major Risk 18-11-18-11-18-11 2,658.47 2,650.00 1.69 32.70 -31.01 FAIL-Major Risk 18-11-18-11A-18-11A 2,683.49 2,675.00 0.54 1.32 -0.75 FAIL-Major Risk 18-11-18-11B-18-11B_WP12 13,900.00 13,900.00 0.07 0.64 -0.53 FAIL-Major Risk 18-11-18-11 DPN-18-11 DPN 2,658.50 2,650.00 0.00 0.98 -0.98 FAIL-Major Risk 18-12-18-12-18-12 2,667.07 2,800.00 586.59 45.37 547.05 Pass-Major Risk 18-12-18-12A-18-12A 2,667.07 2,800.00 586.59 45.37 547.05 Pass-Major Risk 18-12-18-12B-18-12B 2,667.07 2,800.00 586.59 45.37 547.05 Pass-Major Risk 18-12-18-12C-18-12C 2,662.87 2,800.00 581.53 45.23 542.06 Pass-Major Risk 18-12-18-12C-18-12C WP 18 2,658.50 2,800.00 580.90 45.18 541.47 Pass-Major Risk 18-12-18-12C Contingency-18-12C Contingency 2,662.87 2,800.00 581.53 45.23 542.06 Pass-Major Risk 18-13-18-13-18-13 3,416.08 3,375.00 119.50 44.34 75.20 Pass-Major Risk 18-13-18-13A-18-13A 3,410.25 3,375.00 119.57 44.32 75.30 Pass-Major Risk 18-13-18-13B-18-136 3,410.25 3,375.00 119.57 44.32 75.30 Pass-Major Risk 18-13-18-13BPB1-18-13BPB1 3,410.25 3,375.00 119.57 44.32 75.30 Pass-Major Risk 18-13-18-13BPB2-18-13BPB2 3,410.25 3,375.00 119.57 44.32 75.30 Pass-Major Risk 18-13-18-13BPB3-18-13BPB3 3,410.25 3,375.00 119.57 44.32 75.30 Pass-Major Risk 18-13-18-13C-18-13C 3,410.25 3,375.00 119.57 44.32 75.29 Pass-Major Risk 18-13-18-13PB1-18-13PB1 3,416.08 3,375.00 119.50 44.34 75.20 Pass-Major Risk 18-13-18-13PB2-18-13PB2 3,416.08 3,375.00 119.50 44.34 75.20 Pass-Major Risk 18-14-18-14-18-14 3,791.84 3,700.00 138.41 49.27 89.34 Pass-Major Risk 18-14-18-14A-18-14A 3,793.67 3,700.00 138.45 49.27 89.39 Pass-Major Risk 18-14-18-14APB1-18-14APB1 3,793.67 3,700.00 138.45 49.27 89.39 Pass-Major Risk 18-14-18-14B-18-14B 3,794.70 3,700.00 138.49 49.27 89.42 Pass-Major Risk 18-14-18-14C-18-14C 3,794.70 3,700.00 138.49 49.27 89.42 Pass-Major Risk 18-15-18-15-18-15 3,767.42 3,650.00 240.68 49.91 191.10 Pass-Major Risk 18-15-18-15A-18-15A 3,767.49 3,650.00 240.68 49.91 191.10 Pass-Major Risk 18-15-18-15APB1-18-15APB1 3,767.49 3,650.00 240.68 49.91 191.10 Pass-Major Risk 18-15-18-15B-18-15B 3,767.42 3,650.00 240.68 49.91 191.10 Pass-Major Risk 18-15-18-15C-18-15C 3,767.49 3,650.00 240.68 49.91 191.10 Pass-Major Risk 18-15-18-15CPB1-18-15CPB1 3,767.49 3,650.00 240.68 49.91 191.10 Pass-Major Risk 18-16-18-16-18-16 4,011.83 3,825.00 282.19 58.02 224.63 Pass-Major Risk 18-16-18-16A-18-16A 4,011.83 3,825.00 282.19 58.02 224.63 Pass-Major Risk 18-16-18-16B-18-16B 4,011.83 3,825.00 282.19 58.02 224.63 Pass-Major Risk 18-17-18-17-18-17 2,709.51 2,800.00 1,269.43 59.75 1,213.21 Pass-Major Risk 18-18-18-18-18-18 4,497.16 4,150.00 206.28 62.93 143.55 Pass-Major Risk 18-18-18-18A-18-18A 4,497.16 4,150.00 206.28 62.93 143.55 Pass-Major Risk 18-18-18-18APB1-18-18APB1 4,497.16 4,150.00 206.28 62.93 143.55 Pass-Major Risk 18-18-18-18B-18-18B 4,497.16 4,150.00 206.28 62.93 143.55 Pass-Major Risk 18-18-18-18BPB1-18-18BPB1 4,497.16 4,150.00 206.28 62.93 143.55 Pass-Major Risk 18-19-18-19-18-19 2,697.31 2,700.00 815.64 49.01 767.53 Pass-Major Risk 18-20-18-20-18-20 2,681.16 2,875.00 825.64 56.92 773.21 Pass-Major Risk 18-21-18-21-18-21 2,656.74 2,800.00 615.52 44.66 576.45 Pass-Major Risk 2/25/2014 5:15:03PM Page 4 of 6 COMPASS 5000.1 Build 61 BP If 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47.10)) Reference Site: PB DS 18 MD Reference: 18-11B @ 64.50usft(Parker 272(ARH=47.10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 18-11 B Pilot Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 18-11 B_PB1_WP05 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB DS 18 18-21-18-21A-18-21A 2,656.74 2,800.00 615.52 44.66 576.45 Pass-Major Risk 18-21-18-21B-18-21B 2,663.26 2,825.00 621.08 44.99 581.74 Pass-Major Risk 18-21-18-21 B-18-21 B Plan 9 2,663.28 2,825.00 621.11 44.99 581.77 Pass-Major Risk 18-22-18-22-18-22 2,660.27 2,650.00 145.54 33.29 112.59 Pass-Major Risk 18-22-18-22A-18-22A 2,660.27 2,650.00 145.54 33.29 112.59 Pass-Major Risk 18-23-18-23-18-23 4,260.78 4,025.00 339.37 53.38 286.13 Pass-Major Risk 18-23-18-23A-18-23A 4,262.81 4,025.00 339.45 53.42 286.15 Pass-Major Risk 18-24-18-24-18-24 3,636.37 3,575.00 155.88 52.61 103.47 Pass-Major Risk 18-24-18-24A-18-24A 3,637.49 3,575.00 155.90 52.63 103.47 Pass-Major Risk 18-24-18-24AL1-18-24AL1 3,637.49 3,575.00 155.90 52.63 103.47 Pass-Major Risk 18-24-18-24AL2-18-24AL2 3,637.49 3,575.00 155.90 52.63 103.47 Pass-Major Risk 18-24-18-24B-18-24B 3,637.49 3,575.00 155.90 52.63 103.47 Pass-Major Risk 18-25-18-25-18-25 2,665.33 2,825.00 571.88 159.33 415.25 Pass-Major Risk 18-25-18-25A-18-25A 2,658.50 2,800.00 568.44 159.39 411.73 Pass-Major Risk 18-25-18-25APB1-18-25APB1 2,664.97 2,825.00 571.41 159.46 414.70 Pass-Major Risk 18-26-18-26-18-26 5,117.18 4,600.00 112.69 100.30 15.88 Pass-Major Risk 18-26-18-26A-18-26A 5,117.18 4,600.00 112.69 100.30 15.88 Pass-Major Risk 18-26-18-26APB1-18-26APB1 5,117.18 4,600.00 112.69 100.30 15.88 Pass-Major Risk 18-26-18-26APB2-18-26APB2 5,117.18 4,600.00 112.69 100.30 15.88 Pass-Major Risk 18-26-18-26B-18-26B 5,117.18 4,600.00 112.69 100.29 15.88 Pass-Major Risk 18-26-18-26PB1-18-26PB1 5,117.18 4,600.00 112.69 100.27 15.95 Pass-Major Risk 18-27-18-27-18-27 4,183.03 3,950.00 398.54 46.51 352.30 Pass-Major Risk 18-27-18-27A-18-27A 4,181.27 3,950.00 398.52 46.47 352.33 Pass-Major Risk 18-27-18-27B-18-27B 4,181.27 3,950.00 398.52 46.47 352.33 Pass-Major Risk 18-27-18-27C-18-27C 4,182.83 3,950.00 392.54 48.09 344.55 Pass-Major Risk 18-27-18-27D-18-27D 4,181.27 3,950.00 398.52 46.48 352.32 Pass-Major Risk 18-27-18-27DPB1-18-27DPB1 4,181.27 3,950.00 398.52 46.48 352.32 Pass-Major Risk 18-27-18-27E-18-27E 4,181.27 3,950.00 398.52 46.48 352.31 Pass-Major Risk 18-27-18-27EPB1-18-27EPB1 4,181.27 3,950.00 398.52 46.48 352.31 Pass-Major Risk 18-27-18-27EPB2-18-27EPB2 4,181.27 3,950.00 398.52 46.48 352.31 Pass-Major Risk 18-27-Plan 18-27E DO NOT USE-Plan 18-27E 4,181.02 3,950.00 398.52 46.47 352.33 Pass-Major Risk 18-28-18-28-18-28 3,091.18 3,175.00 278.72 53.76 225.58 Pass-Major Risk 18-28-18-28PB1-18-28PB1 3,091.18 3,175.00 278.72 53.78 225.55 Pass-Major Risk 18-29-18-29-18-29 2,972.48 2,925.00 542.32 35.05 507.53 Pass-Major Risk 18-29-18-29A-18-29A 2,972.48 2,925.00 542.32 35.05 507.53 Pass-Major Risk 18-29-18-29B-18-29B 2,972.38 2,925.00 542.32 35.32 507.27 Pass-Major Risk 18-29-18-29BPB1-18-29BPB1 2,972.38 2,925.00 542.32 35.05 507.53 Pass-Major Risk 18-29-18-29C-18-29C 2,979.02 2,925.00 542.43 35.27 507.43 Pass-Major Risk 18-31-18-31-18-31 3,115.15 3,125.00 285.27 44.74 245.97 Pass-Major Risk 18-31-18-31A-18-31A 3,115.15 3,125.00 285.27 44.79 245.96 Pass-Major Risk 18-31-18-31PB1-18-31PB1 3,115.15 3,125.00 285.27 44.79 245.96 Pass-Major Risk 18-32-18-32-18-32 3,172.27 3,275.00 448.41 49.60 399.33 Pass-Major Risk 18-32-18-32A-18-32A 3,172.27 3,275.00 448.41 49.62 399.31 Pass-Major Risk 18-32-18-32A-Plan#103 3,172.27 3,275.00 448.41 49.78 399.16 Pass-Major Risk 18-32-18-32B-18-32B 3,172.27 3,275.00 448.41 49.73 399.22 Pass-Major Risk 18-33-18-33-18-33 2,658.22 2,800.00 275.96 61.47 221.95 Pass-Major Risk 18-33-18-33A-18-33A 2,658.22 2,800.00 275.96 61.67 221.83 Pass-Major Risk 18-33-18-33APB1-18-33APB1 2,658.22 2,800.00 275.96 61.67 221.82 Pass-Major Risk 18-34-18-34-18-34 2,665.54 2,800.00 419.57 61.50 363.42 Pass-Major Risk 2/25/2014 5:15:03PM Page 5 of 6 COMPASS 5000.1 Build 61 BP 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11 Project: Prudhoe Bay TVD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47 10)) Reference Site: PB DS 18 MD Reference: 18-11 B @ 64.50usft(Parker 272(ARH=47 10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 18-11B Pilot Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 18-11 B_PB1_WP05 Offset ND Reference: Offset Datum Reference Depths are relative to 18-11 B @ 64.50usft(Parker 272 Coordinates are relative to 18-11 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.00 W° Grid Convergence at Surface is:1.47° Ladder Plot 1600- �` � ,.I ,' ri,,,i.' I I EH1I. bj __ __J_-C _, ____ _1___ 1200- iira �'I ',.i? lit ' : S': _ii � I �• , ii I r l o I. V3 :�r•;FI. 18-09CP61,PIan2V0 -f- 18.21,18-2 i,1:-•1AV0 -0'A,PI #119 V2 --- , 7 � 1; 10,18-1 V3 - --I NI _ 'v, ---I-X49`15.21;18-21Br1 �18V0 V 5 cu `l, I • 1 10A,1 110AV1 1 It i $ 18.21,1621Bt1•�'113 Plan 9✓0 7A V4 n �2 4- ,, 0 ;10APB1 18-10APB1 V1 I 18-22,18-22,1:'2 V1 �07AB81 VQ° ..:1..",16' ' '10APB2,18-10APB2V1 I I - 18.22,18-22AI, •+ •V1 V1 �,.+ 10 1 -108,18-10B V6 , �♦ 18-23,18-23,1:' .•3 V1 C 3/0/3 a) i' R s1 r, .':-100,18-10C V0 _1 -e- 18-23,18-23A,1 +•3A V1 i V2 Uo 1 ,, 'y., 8+ OCPB1,18-,DCPB1VO i -& 104,18-24,18-14 V2 1A V6 >vj1- �[j .,: 11,1 11V4„. ' y , i -41-74/8-24,18-24A,1:-24A V1 #'20d V� 400- , I ,,:•11 -_ = I _ : ,18-24AL1,18-24AL1 V V1 0 841,- : 11 18-141_ 4- V0 'I 18-24,18-24AL2,18-24AL2 V V7 ,fAs e," & . -11 DPN,18-11 V 1,70- 18 24,18 248,18-246 V� 31-01 V2 ;, `� 1 18 t;18-12 Vt ,,Y $1825,18-25,18-25 V1 IA V1 18-12,1 A,18-12A V 1 : 18-25,18-25A,18- A V1 V) 18-12,1&12B,18-12BV5 I -- 18=25,18-25APB3 .18-25APB1V1 2A V2 0 1----- 81 -12,1412C,18-12CV0 I I ' 18126,18-26,18-26 V1 18-02APB1 v1 0 2500 18-12,4Q 90,18-120 WP 1 EN7,0 1000018-26A,18-2640000 23 VO 18-12,18-12C McRfiAteg illept Al 1Jr0) 18-26,18-26APB1,18-26APB1 V2 )2C V0 -A- 18-12,18-120 Contingency,18-120 Contingency WP 3.0 V0 18-26,18-26APB2,18-26APB2 V2 1&-02CPB1 VO -e- 18-13,18-13,18-13 VO -4- 18-26,18-26B,18-26B VO V3 -9- 18-13,18-13A,18-13A VO $ 18-26,18-26PB1,18-26PB1 V1 13A V1 18-13,18-136,18-13B VO -4- 18-27,18-27,18-27 V1 33 V2 18-13,18-13BPB1,18-13BPB1 VO -e- 18-27,18-27A,18-27A V1 )3C VO -6- 18-13,18-13BPB2,18-13BPB2 V0 18-27,18-276,18-27B V1 V? -e- 18-13,18-13BPB3,18-13BPB3 VO -6- 18-27,18-270,18-27C V7 4A V1 -X-- 18-13,18-13C,18-13C VO -13- 18-27,18-27D,18-27D V2 46 V4 18-13,18-13PB1,18-13PB1 VO -a- 18-27,18-27DPB1,18-27DPB1 V2 18 O4BPB1 V9 18-13,18-13PB2,18-13PB2 V0 -4- 18-27,18-27E,18-27E V0 )4C VO 18-14,18-14,18-14 V5 18-27,18-27EPB1,18-27EPB1 VO 1817-.1 123-14,18-14A,18-14A V4 18-2/,1t3-2/L1131,18-1/Lt'li1 V U 2/25/2014 5.15:03PM Page 6 of 6 COMPASS 5000,1 Build 61 Ferguson, Victoria L (DOA) From: Ferguson,Victoria L(DOA) Sent: Thursday,April 10, 2014 1:54 PM To: 'Mammadov, Famil' Cc: Lastufka,Joseph N (Joseph.Lastufka@bp.com); Davies, Stephen F (DOA) Subject: PBU 18-11B (PTD 213-195) Change of Approved Program Follow Up Flag: Follow up Flag Status: Flagged Famil, Please submit a 10-403 Change of Approved program. Include the new directional survey, new anti-collision report, new procedure and any other changes. Any changes in the approved procedure can be edited on the original submission by crossing out the old information and adding the changes in red if that is convenient. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W 7th Ave, Ste 100 Anchorage,AK 99501 Work (907)793-1247 victoria.ferquson a(�.alaska.gov From: Mammadov, Famil [mailto:famil.mammadov@ bp.com] Sent:Thursday, April 10, 2014 1:38 PM To: Ferguson, Victoria L(DOA) Cc: Lastufka, Joseph N Subject: Changes to 18-11B Well Design Hi Victoria, I would like to give you an update on some design changes for 18-11B well (permit to drill#213-195).The changes will optimize our drilling process and the added risk is negligible. 1. P&A plan change:Originally,we were planning to run a USIT log to determine top of cement behind 9-5/8" casing. We were able to find old records and qualify our cement job based on volumetric calculations(this process was internally risk assessed and approved by our leadership including Alaska VP Wells).The records indicate that the top of the cement column is located at a sufficient distance above the reservoir preventing any potential cross-flow of fluids between different formations.The only change to the P&A plan is the fact that we will not run a USIT log.We are still going to place a 1000ft balanced cement plug into the 9-5/8" casing string. 2. Directional plan/shut in wells:We have been able to optimize our directional plan for the 8.5" intermediate section in such a way that L2-21A and 18-26B wells pass the anti-collision risk and do not require to be shut in. The production hole section did not undergo any changes, i.e.our drilling targets are still the same. 3. Cut&pull 9-5/8"casing:we were planning to cut and pull part of 9-5/8" casing and run 7" liner to surface.We determined that it would be much more efficient to avoid cut&pull of 9-5/8"casing and run 7"string as a liner. I have attached a proposed well schematic for the easy of understanding. 1 Y . Please let me know if you would like to discuss any of the changes mentioned above or need me to send some more info. Thanks Famil Mammadov GWO 1 BP Alaska I Drilling Engineer—IPA Rotary I Mobile:+1(907)306 7739 I Office:+1 (907)564 4135 email:famil.mammadov ci bp.com 2 \�,I�%/i THE STATE .i4.',rJc2-1 �, 1.1,_ ,- ]:,r1' / a _� _ ^- 333 ever','n Avcrue 1. "r_--':*- � ; ( R 1: } ; i t nclic;iac,c, F lr- a 99[Al 357 Mary Endacott Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 18-11B BP Exploration (Alaska), Inc. Permit No: 213-195 Surface Location: 1278' FNL, 431' FWL, SEC. 19, T11N, R15E, UM Bottomhole Location: 2268' FSL, 3376' FEL, SEC. 11, T11N, R14E, UM Dear Ms. Endacott: Enclosed is the approved application for permit to re-drill the above referenced development well. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name PBU 18-11BPH and API number 50-029-21181-70- 00 from records, data and logs acquired for well 18-11B. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, P4,,,-4,--- Cathy P. Foerster Chair this/milk— DATED - day of January, 2014. STATE OF ALASKA RECEIVED $ ALASI /IL AND GAS CONSERVATION COMM )N DEC 1 1 2013 PERMIT TO DRILL 20 AAC 25.005 AOC CC 1 a.Type of work: 1 b.Proposed Well Class: ®Development • 0 Service- ®Single . lc.Specify if well is proposed for: 0 Drill . 0 Latera 0 Stratigraphic 0 Development 0 Service- 0 Multiple 0 Coalbed 0 Gas ®Redrill 0 Reentr 0 Explorator 0 Service- 0 Service- ❑Geotherm 0 Shale 2.Operator Name. 5 Bond ®Blanke 0 Single 11.Well Name and Number: BP Exploration (Alaska) Inc. Bond No 6194193 PBU 18-11B • 3. Address 6 Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 19405' • TVD 8645' • Prudhoe Bay/Prudhoe Bay 4a.Location of Well(Governmental Section): 7. Property Designation(Lease Number): _ '7 Surface: ADL 028321 &028302 l �'2-E'CS L /. 1278' FNL,431'FWL, Sec. 19,T11N, R15E, UM • Top of Productive Horizon 8. Land Use Permit 13.Approximate Spud Date: 1294'FSL,3228'FEL,Sec. 12,T11N, R14E, UM April 1,2014 Total Depth 9.Acres in Property: 14.Distance to Nearest Property. 2268' FSL,3376'FEL, Sec. 11,T11N, R14E, UM 2480&2560 22500' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 64.35' • feet 15.Distance to Nearest Well Open Surface: x 692199 • y-5960602• Zone- ASP4 GL Elevation above MSL: 17.4' • feet to Same Pool: 2400' 16.Deviated Wells. Kickoff Depth: 2654' feet - 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 97 degrees Downhole: 4422 Surface: 3015 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8-1/2" 7" 26# L-80 _VamTop 13353' 47' 47' 13400' 8178' 226 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr80 VamTop 6205' 13200' 8015' 19405' 8645' 673 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) 12751' 8905' 10672' 12718' 8895' None Casing Length Size Cement Volume MD ND Conductor/Structural 110' 20" 1900#Poleset 110' 110' Surface 2500' 13-3/8" .2400 sx CSIII,400 sx CS II 2500' ' 2500' Intermediate 11062' 9-5/8" 1000 sx Class'G', 300 sx CS II 11062' ' 8437' Production Liner 607' 7" 300 sx Class'G' 10763'- 11370' 8233'-8638' Liner 2077' 2-3/8" 48 sx Class'G' 10672'- 12749' 8170'-8904' Perforation Depth MD(ft): 12530'- 12695' Perforation Depth ND(ft). 8823'-8888' 20.Attachments: 0 Property ®BOP ®Drilling Program 0 Time vs Depth 0 Shallow Hazard ®Diverter 0 Seabed ®Drilling Fluid Program ®20 AAC 25.050 21. Verbal Approval: Commission Representative: Date 22.I hereby certify that the foregoing is true and correct: Contact Famil Mammadov,564-4135 Printed Name Mary Endacott Title Engineering Team Leader Email Famil.Mammadov@bp com ter, Signature �c � ?,,/(a( Phone 564-4388 Date 12/11/1 2.> / Commission Use Only Permit To Drill API Number. Permit Appro a See cover letter for Number: /-L 3 / I 50-029-21181-02-00 I i I 114 other requirements* Conditions of Approval: If box is checked,well may not be used to explore for,test,or pr duce coalbed methane,gas hydrates,or gas E✓j contained shales: �/ /J Other. d I r� res. 1d 3 5/V`V!1 p c / El Y, Samples Req'd es [�No Mud Log Req'd: ❑Yes L�No J ! H2S Measures: [VYes ❑yo Directional Survey Req'd: [ Yes ❑plo Spacing exception req'd ❑YesNo inclination-only svy Req'd: 0 YesNo APPROVED BY APPROVED BY - COMMIAASS��O E _THE COMMISSION Date �f k' Form 10-401 Revised 10/2 t 12 This pe alirer �f�pl rom the date of approval(20 AAC 25.005(g)) Submit Form and Attachments In Duplicate\V 4 To: Alaska Oil & Gas Conservation Commission 0.04 " From: Famil Mammadov by� Drilling Engineer ii. Date: December 12, 2013 Re: 18-11B Permit to Drill Well History: This well was originally completed in 1984. It was then worked over in 1990. The well sidetracked by a coiled tubing rig in 11/2009. The well produced for 7 months before the water production increased from < - 100bwpd to 3000bwpd in July 2010. It was confirmed that the water was from the Cretaceous formation. a Reason for sidetrack: 18-11A is a non-operable well due to production casing and tubing leaks. A rig workover of the current well would be very risky due to scaling caused by crossflow of the Cretaceous with the Ivishak. Therefore, this well is not operable and has no remaining value. Diagnostics logs (SCMT and Gravel Pack RST) were run to determine if any fill was present below the production casing leak. Both logs indicated solids accumulation over the interval between 10,162' — 10,436' MD. Sidetrack Plan: The existing 18-11A wellbore will be abandoned with a lateral cement plug set above the reservoir. The new wellbore will be mechanically isolated from 18-11A by an EZSV plug at —2700'. Casing whipstock will be set over • EZSV and sidetrack will be performed out of 9-5/8" cased hole. An 8 '/2" intermediate hole is proposed to be drilled to the top of Sag River to be then cased with a 7" 26# L-80 string to surface. A 6 1/8" hole will then be drilled from the bottom of the 7" targeting Ivishak formation. The production section is to be completed with 4 '/2" liner systems with top of cement planned to top of liner depth. The well will be perforated across Ivishak Zone 1A and tied to surface with 4-1/2" tubing string. MAASP: 3015 psi — Ivishak 21TS Pre-Rig Work: (scheduled to begin January 15, 2014) 1. Perform diagnostics to determine if any solid accumulation present around the tubing under the production leak. Determine the free point(completed) 2. Pull the liner top test plug and replace it with a permanent mechanical plug 3. Drift for Jet Cut 4. Jet cut tubing above the free point. Proposed cut depth at— 10,000' 5. MIT-OA to 2,500 psi 6. PPPOT-T and IC. Function LDS. 7. Set BPV and test 8. Install dry-hole tree Rig Work: (scheduled to begin on April 1, 2014) 1. MIRU Parker 272 and test BOPE 2. Pull and L/D 3.5" 9.3# L-80 Tubing from —10,000 ft MD including control lines from the chemical mandrel 3. PU 8-1/2" clean-out assembly and RIH to clean-out 9-5/8" casing to top tubing stub at —10,000' MD 4. Run a circumferential cement bond log to determine TOC behind 9-5/8" casing (estimated at — 8591' MD ft for the first stage and 2144' MD for second stage). 5. Perform P&A operations depending on the extent of TOC behind 9-5/8" - • BP policy requires at least 100 ft TVD of annular cement isolation between Put River / Sag River / Ivishak and CM3 shale. • Fullbore P&A cement plug (min 650ft TVD) will be placed above the tubing stub if isolation behind 9- 5/8" casing is confirmed. i. Place an EZSV plug at—9,800'MD and perform weight test ii. Pump cased hole cement plug (min 100' TVD of lateral plug shall be provided). Base plan is an equivalent of 1,100' of cement volume. 6. Run a packer to be able to pressure test cement having isolated the PC leak (@7,100' MD) 7. RU E-line, RIH with GR/CCL and 9-5/8" EZSV for 47#casing. Set the EZSV at—2700' MD (competent formation /confirm with GR) as required to avoid cutting a casing collar while milling the window. POOH. Rig down E-line. 8. Pressure test the EZSV to 3500 psi for 30 minutes and chart. 9. Run in with a cutting assembly. Cut the 9-%" casing above the second stage TOC as determined from USIT log. POOH, L/D assembly. 10. Change out to 9-%" rams, and tew.rams to 250 psi low/3500 psi high. 11. MU casing spear assembly and unseat the 9-%". Pull the 9-%" casing from the cut. 12. Change out to 2-7/8" x 5-1/2"VBR Rams. Test to 250 psi low/3500 psi high. 13. RIH with casing scraper and clean-out the 13-%" casing and dress off the 9-%" casing stub. 14. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Shear off the - whipstock. 15. Mill window, drill 20-50ft of new formation, perform LOT 16. MU 8-1/2" intermediate hole BHA(GR/RES/PWD) and Drill to TD in the TSGR. Short trip. RIH to TD. POOH lay down drilling assembly. 17. Change out to 7" casing rams and test to 250 psi low/3500 psi high. 18. RU, run and cement 7" casing string. Test casing to 250 psi low/3500 psi high 19. MU 6-1/8" production hole BHA(GR/RES/Neu/Den) and drill pilot production hole to — 14,401' MD ✓ f" /' /co% 20. Perform open hole sidetrack and continue drilling to TD 21. RU and run 4-1/2" production liner and cement in place. Test liner to 250 psi low/3500 psi high 22. MU and RIH with perforation guns and perforate the 4-1/2" liner. 23. RU and Run 4-1/2" completion, drop ball and rod and set packer, test tubing and IA to 250 psi low/3500 psi high. 24. Shear GLM circulate corrosion inhibitor, install TWC test to 250 psi low/3500 psi high. 25. ND BOP, BU tree install BPV test to 250 psi low/3500 psi high. Freeze protect well. 26. RDMO. Post-Rig Work: 1. Install tree 2. MI/RU slick line. Pull the BPV. 3. Re-install wellhouse and FL's. 4. Generic GLV's Famil Mammadov Drilling Engineer Office: 907-564-4135 Cell: 907-306-7739 Email: famil.mammadov@bp.com Attachments: Rig BOP Schematic Current Well Schematic Pre-Rig Well Schematic Proposed Well Schematic 18-1 lB Drilling Hazards and Contingencies Directional Plan CC: Well File Joe Lastufka • Planned Well Summary et Well 18-11B ' Well Producer Objective Ivishak API Number: 50029211810/ ,ha 0,.;..I3 Current Status Shut-In Estimated Start Date: 04/01/14 - Time to Complete: 63 days Surface Northing Easting Offsets TRS Location 5,960,602 • 692,199 . 1277' FNL 431' FWL . T11N R15E S19 . TSAG Northing Easting TVDss Offsets TRS 5,968,358 688,341 -8,113' 1294 FSL 2052 FWL T11N R14E S12 Production Northing Easting TVDss Offsets TRS Hole Target Location 5,969,198 682,890 -8,580' 2268 FSL 1904FWL T11N R14E S11 Planned KOP: 2,654' MD/-2,589.5' TVDSS Planned TD: 19,405.2' MD/-8,580' TVDSS • Rig: Parker 272 BF/RT: 17.4' /46.95' RTE: 64.35' • Directional-Baker PB1_WP03 (Pilot Hole)/ Plan #10 KOP: 2654' MD Maximum Hole Angle: - 74° in the 8-1/2" intermediate section 97° in the 6-1/8" production section Close Approach Wells: L2-07A, L2-21A, 18-26B Survey Program: Survey Tool Program Date _:E.,2.7,12 13 From To )us*) (usf) Survey Wel lb-orep Tool Mane Desdiption 57.50 2,854 05 Survey rt GCT Gyro M. '_ =t GCT-MS Schmmberger GCT muleshat 2,854.05 2,874 50 18-11 B_P81 WP03(13-'I S_ :ry GCT-M'S Schaarmberger GCT mut shot 2,875.50 2808 50 18-11 B_P81_WP03 r 18-118= :.h GYD-GC-SS Gyuooata gyro single shots 2,808.50 3.208.50 18-11B_P81_WP03(18- 8:_ _ MWD+IFR MWD+IFR oorreceon 3,808.50 11322.50 18.1 t B_P81 WP03(13-"18= _.r MOND+IFR.MS MWD+IFR+Mufti Station 13,3261.50 13.855.02 18-1 t B_P81 WP03(18-118 P bat,i M'WD+IFR MWD+FR correct= 13.855.02 12.405 23 18.1'B W P`4 '.5-11 B M'WD+IFR.MS MWD+FR+Multi Station Nearest Property Line: 22,500' (N) Nearest Well within Pool: 2,400' (L2-07A) Formation Tops & Pore rressure Estimate (SOR) Estimated Minimum Most Likely Maximum Depth Fluid Formation Formation Top Pore Pressure Pore Pressure Pore Pressure Uncertainty Type (TVDss) (EMW ppg) (EMW ppg) (EMW ppg) (+/-TVD ft) (for sands) Surface 1 8.4 8.4 8.4 Behind Pipe brine lea--Pn G1 500 8.4 8.4 8.4 Behind Ape brine SV6 1,518 8.4 8.4 8.4 Behind Ape brine __Zeff',.). BPRF 1,853 8.4 8.4 8.4 Behind Ape brine 2,650 8.4 8.4 8.5 Behind Ape brine 5.6_? r SV5 2,954 8.4 8.4 8.5 20' brine 7 SV4 3,138 8.4 8.4 8.5 20' brine SV3 3,625 8.4 8.4 8.5 20' brine SV2 3,800 8.4 8.4 8.5 20' brine SV1 4,205 8.4 8.4 8.5 20' brine ______^ UG4 4,724 8.4 8.4 9.7 20' brine O UG3 4,925 8.7 9.3 9.7 20' brine -�D,Z UG1 5,464 7 ! 8.7 9.4 10.5 / 20' brine WS2 6,026 8.7 9.3 9.4 20' brine WS1 6,242 8.7 9.3 9.4 20' brine CM3 6,460 9.4 9.6 10.0 20' brine CM2 7,007 /!y/7/Nb 9.6 10.1 10.9 20' brine reg.S` iO4, CM1 7,484 9.6 10.2 10.9 20' brine THRZ 7,853 9.6 10.2 10.6 20' brine BHRZ/TPTR 7,984 /5,yipe 7.6 8.1 10.6 20' gas BPTR/LCU 8,039 7.6 8.1 10.3 20' gas TKNG 8,040 9.6 10.2 10.3 20' brine TSGR 8,113 /�-rn';7.5 7.9 8.0 20' gas g V_8.7 TSHU 8,177 7.5 7.9 9.1 20' gas TSAD 8,219 7.4 7.9 7.9 20' gas TCGL 8,297 7.4 7.9 7.9 20' gas BCGL 8,364 7.4 7.8 8.6 20' gas 23SB 8,419 7.4 7.8 8.6 20' gas 22TS 8,454 7.4 7.8 8.6 20' gas • 21TS 8,482 7.4 7.8 8.8 20' gas TZ1B 8,576 7.2 7.7 7.9 20' gas TDF 8,612 7.2 7.6 7.9 20' oil/gas BSAD 8,640 7.2 7.6 7.9 20' oil Kavik 8,690 7.2 7.6 10.0 20' oil Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn. Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD/TVDrkb MD/TVDBRT 8-%/2" 7" 26# L-80 VaHCop 7,240 5,410 13,353 Surface 13,400' /8,178' 6-1/8" 4 1/2" 12.6# 13Cr-80 Vam Top 8,430 7,500 6205' 13200'/ 8015' 19405' /8644' (-200' lap) Tubing 4 %" 12.6# 13Cr-80 Vam Top 8,430 7,500 13153' surface 13200' /8015' Mud Program Intermediate Section Mud properties for 8 '/2" hole section: Depth Mud weight PV YP API FL HTHP Fl. pH Drill MBT (lb/gal) Loss Loss @ solids 200°F or BHCT MD (ft) Min Preferred Max cP Ib/100ft1 m1/30 min 2654-5700 8.5 8.6-9.4 9.8 10-15 18-25 <8 N/C 8.5- <6.0 <20 -v7o37Voss 9.5 5700-10900 9.6 9.8-10.2 10.4 10-15 18-25 <8 N/C 8.5- <6.0 <20 9.5 10900- 10.3 10.5-10.6 11.2 10-15 18-25 <8 N/C 8.5- <6.0 <20 13402 9.5 Production Section Mud properties for 6 1/8" hole section: Depth Mud weight PV YP API Fl. Low Shear pH MBT (lb/gal) Loss Rate Visc. MD (ft) Min Preferred Max cP Ib/100ft2 ml/30 min cP 13402-19405 8.4 8.4-8.7 . 9.0 • <12 10-25 <12 >15000 8.0- <4 9.5 Logging Program 8-1/2" Intermediate: Sample Catchers-as required by Geology Drilling: Dir/GR/Res Open Hole: None Cased Hole: USIT -contingency 6-1/8" Production: Sample Catchers-as required by Geology Drilling: Dir/GR/ Res/Neu/ Den • Open Hole: None Cased Hole: None Cement Program Casing Size 7" 26#, L-80 Vam Top HC Intermediate Liner Basis: Lead: None Tail: 1500' of annular length + 30% excess + 80' shoe track. Tail TOC at 11900' MD Total Cement Spacer 30 bbls of Viscosified Spacer Volume: Lead N/A Tail 46.6 bbls, 261 cuft, 226 sks 15.8 lb/gal Class G + adds- 1.16 cuft/sk Temp BHST 176° F, BHCT TBD by Schlumberger Casing Size 4.5" 12.6#, 13-Cr-80 Vam Top Production Liner Basis: Lead: None Tail: Open hole volume +40% excess+ 150' of liner lap + 120' shoetracl Tail TOC: 13200' MD (cement at TOL w/excess to be circulated out) Total Cement Spacer 25 bbls of Viscosified Spacer weighted (Mud Push II) Volume: Lead N/A Tail 139.9 bbls, 788 cuft, 673 sks 15.8 lb/gal Class G + adds- 1.17 cuft/sk Temp BHST= 185° F, BHCT TBD by Schlumberger Surface and Anti-Collision Issues Surface Shut-in Wells: L2-07A. L2-21A, 18-26B wells shall be shut down while drilling the intermediate hole section. 18-21B well house will be under mud module and may have to be shut down during rig operations (per BP policy) Close Approach Shut-in Wells: L2-07A. L2-21A, 18-26B wells do not pass major collision criteria Hydrogen Sulfide DS-18 is not an H2S pad. Well Name H2S Level ' Roadino Date Comments Parent Well(if sidetrack) 18-11A 16 ppm 3/25/2010 #1 Closest SHL Well H2S Level 18-21A 20 ppm 3/12/2011 #2 Closest SHL Well H2S Level 18-20 5 ppm 7/5/1996 #1 Closest BHL Well H2S Level 15-07C 20 ppm 3/15/2013 #2 Closest BHL Well H2S Level L2-07A 20 ppm 9/15/2012 #3 Closest BHL Well H2S Level K-10C 30 ppm 5/30/2013 flax. Recorded H2S on Pad/Facility 18-30A 28 ppm 1/1/2011 Other Relevant H2S Data (H2S alarms from rigs,etc.) Faults 18-11B will not cross any mapped faults Drilling Waste Disposal • There is no annular injection in this well. - • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal / Contact the GPB Environmental Advisors (659- 5893) f/guidance. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear ram, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for 18-11B will be 7 to 14 days during drilling phase and 7 days during de-completion and surface casing work. Intermediate Interval7. n/� ✓ ��✓ Maximum anticipated BHP 4422 psi @ 8039' TVDSS (10.58 ppg EMW) Maximum surface pressure 2061 psi (.10 psi/ft gas gradient to surface assuming fracture gradient at the shoe + 2 ppg safety factor) Kick tolerance 11 bbls for Sand FG 40 bbls for Shale FG Planned BOP test pressure Rams test to 3500 psi/250 psi. Annular test to 3500 psi/250 psi 13-3/8" Casing 2500 psi surface pressure 9-5/8" Casing Test/7" 3500 psi surface pressure Casing Integrity Test—8-1/2" hole FIT after drilling 20' from middle of window 7" Casing VBRs upper cavity will be changed to 7" rams for the 7" liner Production Interval '7 Maximum anticipated BHP 3863 psi @ 8482' TVDss (8.76 ppg EMW) Maximum surface pressure 3015 psi (.10 psi/ft gas gradient to surface) / Kick tolerance Infinite with 8.7 ppg MW at min predicted fracture gradient of 12.74 ppg Planned BOP test pressure Rams test to 3500 psi/250 psi. Annular test to 3500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20' of new hole 4-1/2" Production Liner 3500 psi surface pressure Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel Parker 272 BOPE Schematic PARKER 272 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-5M I 13 5/8"-5M STUDDED TOP rtn trrn 13 5/8"-5M FLANGED BOTTOM •=a t' W/(2) 14" UL2 OPERATOR, UPPER CAVITY Vv ANNULAR BOP: AND (2) 14" PSLK W/BSTR OPERATOR, niIFS tnI ImRgy} SHAFFER LXT 13 5/8"-5M 13-5/ LOWER CAVITY 13-5/8" 5M STUDDED TOP 0 13-5/8" 5M FLANGED BOTTOM 0 1 I DRILLING CROSS: I I 13 5/8"-5M FLANGED TOP . 61.. I 0— of I 13 5/8"-5M FLANGED BOTTOM al ,°°,"t��° �«L W (2) 3 1/8"-5M SIDE OUTLETS 1 U °f � II ` ° e ° II n II 1 .• U.. .9r II 1" I KILL LINE: 1 �1 g� 1 2-1/16" 5M FLEX HOSE VQQQQ( r*".,,�1 MI• IN ,1� „ � 2 7/16" 5M X 3-1/8" 5M D.S.A. L� �, 3-1/8" 5M FLANGED MANUAL GATE VALVE ,0 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE E lit --W ° ° 2.�' e 3 �' ■�1• °°° • ■ 3 I 1 1 CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE _ SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-9.4 STUDDED TOP 8" 5M FLEX HOSE 13 5/8"- 5M FLANGED BOTTOM 3-1 / W/(2) 14" UL2 OPERATOR Current Schematic: TREE=WELLHEAD= GMc O 1 V-11 A t 18-11A SAFETY DEPTHS ARLL E LMD 70"@ 12673 ACTUATOR= AXE±SON OF8G KB.EE'v 5' ORIG BF.HEV 9 -4---.+ J .+ 43' -5-1/2"X 3-112'XO,10=2 992" ORIG KOP= 3150' 20'CONDUCTOR - Max Angle- 89"Q 12245 DutumM)= 12609' 2107• l fal/2"OMV 7T,Z.V.0-2813" Datum TVD= 8800'SS 113-3/8"CSG,72#,L-80 BTC,D=12.347" I 2500' N-j k GAS LFT MANJFELS ST M) IVO DEV TY FE VLV LATCH'PORT DATE 1 3230 3226 13 M/3 DMY RK 0 07/22/10 Minimum ID= 1.75"@ 10672' 2 7056 5850 54 - Mu1G DMY RK 0 05/31/121 35 KB LINER TOP PACKER 3 9555 7430 50 MAC' MY RK 0 06/12/121 [PC 1 111(111'AKS((X)N llt',1 I)Of'"';'7101 1 -7100 I—o "— 110162"-10436'1 1,ti.(F1.1*,I GRAVEL LOG 10/14/13) 1 f3-IF3ACAL MAN7RELS — STS MD TVD 'DEV TYPE ' VI.V LATCH PORT DATE 4 10582 8108-47 KBUGI TS-CHEM BK 13116 11120190 _ 10672' 1-135 KB LTP w i SEAL STEM.D=1.75'(11/17/09) j II -- 10672' -I LN2 TOP TEST PLUG(06/12112) I � ' 7---' 10700' -19-5/8'X 3-112"BKR OB PERM FKR 13=7 1 10P OF CMT SHEATHICOLLAR, - ----•-,•;w0 1(171 n' -is 112'pH-0i Si-V,U=1.875', { 10703' M II LED TO 2.8'(08125/09) +i.r :w ___._. .._..... iii .is' TOP OF 7"LW I- 10776' 1---A+ ,- I 10791' 71-3 t/2"05%N NO GO NIP, 1*! MILLED TO 280"(06/25/09) r ' 3-1/2'TBG-PC,9.30,L-80,.0087 bpf,U=2.997 -[ 10803' ~ r10803' 3 1l1"WI FC L M TY)BEHIND elf'1- ' 10799'1H ELM}TT LOGGED 03108/917 19-5/8'CSC',470,L-80 NSCC/BTC,ID=8 681' 1-1 11 067 }--J r k. )�> .{ MLLOUTWFDOW(18-11A) 11370'- 11375' r I7"LNR,294,t-80, 0383 bpt.ID 6 276" 1-E-11370 LI. 4. PERFORATION SUP/MARY - l7_ _1 REF LOG:AAC21L/SCMT 11106/09 --�� `---t_�-- ANGLE AT TOP PERF'67'@ 12530' -= --- =. tote-Refer to Production OB for historical pert dat SFLE SPF N1E3TVAL Oprt/Sqz DATE �`' 136" 6 12530-12580 0 11/06/094y, 1 -12695 0 11/06/09 FSTD 12718' 12 318"L1*4/4,L 80, 003910,U 1.92' 1-1 12749' DATE REV BY COM NTS DATE 1 REV BY COPJ&NTS R21-OHOEBAY UNIT 09/17/84 18WN41 INITIAL COMPLETION 06/15/12 AM RIC GLV CO's(06/8-12/12) WH.L. 18-11A 09/26190 Ain 4 RWO 06/16/12 PJC CEM kJ C'O(11102/90) FEFMT No: 2090740 11/07/09 NORESC1 CTD SIDETRACK(18-11A) 06/19/13 i PJC LNR1 CSG CORRECTION AFI hb: 50-029-21181-01 06/05/12 BES/JMD GLV C1O(05/31112) 12/06/13 FM PJC PC LEAK/RLL WId'C 1 UN `;LC 19. 11114,F(1hE,12/8'FM_&43T FIN 06/05/12 GJF/JMD L1Pw I SEAL STEM(11117109) 06/15112 RIC LTP&LTD'CORR CT1ON5 II BP Exploration(Alaska) Pre-rig Schematic: - TREE= A.EVOYGEN 3 SAF I-I Y NOTES WEII ANGLE>70"(cd12873' WELLFFAD= McEVOY 18-11 1 A 1811ACTDDEPIHSARE ELMO_ ACTUATOR= EL AxsoORIG KB H Po 55 PRE RIG ORIG BE E FV ' I • •1 43' -5-112'x 3-112"XD,ID=2 992" OR1G KOP= 3150' 120"CONDUCTOR 1-I_ ? Mu Angie= 89°@ 12245' Datum 513- 12609' ` ' I 218T 1 I31/2"OTI3FhV' 1t Y4,ro-2813' Datum TVD•=• 8800'SS L13-3/8"CSG,72V,L-80 BTC,D=12.347 J-{ 2600' ' GAS LFT MANDRELS Minimum ID =1,75"@ 1067T ST PV TVD DEV TYPE VLV LATCH FORT DATE 35 KB LINER TOP PACKER 1 3230 3226 13 MAG DMY RK 0 07122110' $ 2 7056 5850 54 MAG OMY RK 0 05/31/12 -7100 3 9555 7430 50 MAG DAM RK 0 06112/12] PC 8 TBG LEAKS(CONFIRMED 07/22110) l� -10000 1-3-1a-TUBriG cur(xx/xx/xx) m _ [10162'-10436' 1I F (EL RST GRAVEL LOG 10/14/13)1 _ CHEMICAL M M) S sr A1) ND DEV• TYPE VLV LAICI-I FORT DA IF 4 1109 8108 47 ;101 8? CHFMI BK 3/18 11100/90 10672' H35 KB LTPwl SEAL STEM.D=1.75"(11117/09) it : _ 10672' HPERNtAN3•tT PL(1G 1 Z p [ 10700' H9-518"X 3-1/2"8KFI DB PERM PKR D=a I 1 ! 10710' 1-.3 1/2'DEPLOY SLV.ID 1.875 ,TOP OF CMT SHEATH/COLLAR. — 10703' (Mk tFD TO 2 8"(08/25/09) e.,�0 y i r r. .v► A. TOP OF 7"LER10776' ~�" s P 2 10781• -43-112'OTIS lW ND-GO NFP. ► 1MILLLO 10 280'(08/25/091 JI r r► x3.112"'MG-PC,9.31Y,L-80,.0087 bp1,D=2.992" -{ 10803' �-13 11T WLEG CM I'D LILI IINU PIPE 10803' r� y 10799' H ELtrD TT LOGGR)03/08/91 +▪' I+ -s9-518'CSG,47#,L-80 NSCCIBTC.I]=8.681' - 11062' 1~ r SI 1 nLJT\mum(18.11A) 11170'- 11175' "LNR,29V,L-80, 0383 bp/,tD-6.276" H -11370 1 r.0-.!▪!1 *- F'Ull ORA TION SUMMARY REF LOG MCNUSCMT 11/06/09 ANGI F AT TOP PERF 67°@ 12530' te.Refer to Production DB for historical pert da SIZE SPF! INTERVAL ' Opn/Sgz DATE 6 12650-126951 0 11/06!09 111 6 12650-126951 0 11706109 RHO 12718' -I 2-3/8'LNZ 4/It,L-80,.0039bpf,D=1-9T 12749' DATE RAJ BY 0211.$&N1 S _ DATE ' REV BY COAT,BNTS FRLDFIDE BAY INT 09/17/84 R1NN 41 INTIAL COMPLETION 06/15/12 AMr PJC GLV C10's(0618-12/12) WELL: 18-1 IA 09/26/90 AUDI 4 IMO 06/16/12 PJC Cf EN P41(20(11/02/90) PERMT kb: 2090740 11/07/09 NORDIC1 CTD SIDETRACK(18-11A) 06/19/13 PJC LNR1 CSG CORRECTION API Ab. 50-029.21181-01 06/05/12 BES/JMD GLV GO(05/31/12) 12/06/13 FM PJC PC LEAF/FILL CORRECTION RFC 19,1191,R15E,1278'FNL 8 431'FWL 06/05/12 Cs11-/J5/) I Weil SEAL STEM(11117109) 06)15/12 PJC L TP 8 L TTP CORK C11ONS 118P Exploration(Alaska) TREE= ' • AAS McEVOY PROPOSAL 1 H-11 B SA NOTES: WELL ANGLE>70°@ ' INITIAL KB.aE 56' I I I BF.E..EV= ? KOP= 2650' ' —I4-112"HES X NP;13=3.813" Max Angle= 74"@ 9200' Datum MD= 12609' Datum TVD= 8800'SS 20"CONDUCTOR ? 13-3/8"CSG,72#,L-80 BTC,ID=12.347" -i 2500' MLLOUT WINDOW(18-116)—2650'- _ ' 9-5/8'WHPSTOCK(XX/XX/XX) H —2650' . r GAS LFT MANDRELS -5/8'CSG,47#,L-80 BTC AB-M, D=8.681' —2660' ST ND TVD DEV TYPE VLV LATCH PORT DATE 5 4 3 2 1 4 I —14-1/2"HES X NP,D=3.813" 211 —13000' -.J7"X 4-1/2"TNT PKR,D= " —14-1/2"HES X NP,D=3.813" ' H4-1/2" -ES XN NP,D=3.725" TOP OF 4-1/2"LNR H —13200' ' 13210' —17'X 5"BKR I-RD-E ZXPN LTP w/TTBK,ID=4.32" 4-1/2"TBG,12.6#,13CR-80 VAM TOP, —I —13210' �4-1/2"WLEG D=4.00 .0152 bpf,D=3.958" \ —I ELMD TT NOT LOGGED —17'X 5"BKR FLEX-LOCK HGR,D=5.25" --I5"X 4-1/2"XO BUSHING,D=3.91' 7°CSG 26#,L-80 HYDRL 563, —I —13400' .0377 bpf,D=_6.226" 41 PERFORATION SLRV?uiARY REF LOG: ANGLE AT TOP PERF:_°@ ' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ PBTD 19285' 4-1/2"LNR 12.6#,13CR-80 HYDRIC 521, ^19405' Vkii�ie .0152 bpf,D=3.958" %P* % DATE REV BY COM IE TS DATE REV BY , CONWENTS PRUDHOE BAY LNT 09/17/84 RYVN41 INTIAL COMPLETION WELL 18-11B 09/26/90 ALAI 4 RNO PERAK No: 11/07/09 NORDIC1 CTD SIDETRACK(18-11A) API No: 50-029-21181-02 06/19/13 PJC SIDETRACK PROPOSAL _SEC 19,T11 N,R15E,1278'FN-&431'FWL 09/03/13 FM'PJC PROPOSAL UPDATES 10/07/13 FM'PJC PROPOSAL UPDATF BP Exploration(Alaska) 18-11B urilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. Intermediate Hole - The section has been split in 3 sections. Normally pressured formations will be drilled with lower mud weight that will provide sufficient overbalance. Mud density will be raised prior drilling into potentially overpressure Cretacious formations. The third section of the well will require the highest mud weight to overbalance Put River formation as well keep Kingak shale formation stable. B. Production Hole - The Sag River and Ivishak formations in this area are expected to be under-pressured at 7.5-8.0 ppg EMW. This interval will be drilled with —8.5-8.9 ppg reservoir drill-in fluid. II. Lost Circulation/Breathing A. Intermediate Hole — lost circulation is moderate. Lowest possible ECD will be used for preventing losses as well as good drilling practices (short trips, rotation, etc.). Breathing risk is high and any uncertainty shall be treated as per well control procedures. B. Production Hole—the risk of lost circulation in this hole section is low. Ill. Kick Tolerance/Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is expected to be in the range of 11-40 bbls. B. Infinite kick tolerance for production hole section with planned mud weights and predicted fracture gradient at the shoe C. Integrity Testing Test Point Test Depth Test type EMW(lb/gal) 9-%" window 20'-50' from the 9-%" window LOT 11.1 minimum 7" shoe 20'-50' from the 7" shoe FIT 9.8 minimum IV. Hydrogen Sulfide DS-18 is not an H2S site. V. Faults 18-11B well will not intersect any mapped faults. There may be some small, poorly defined D to S faults in - the lower Colville (CM1), at about 12,800 MD. VI. Anti-Collision Issues Following wells do not pass major risk criteria L2-07A. L2-21A, 18-26B CONSULT THE DS-18 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION Directional Plan — Pilot Section PD WP03/ Reservoir Section WP10 North America - ALASKA - BP Prudhoe Bay PB DS 18 18-11 - Slot 11 500292118100 18-11B Pilot Plan: 18-11 B PB1 WP03 Standard Planning Report - Geographic 06 December. 2013 BP Planning Report-Geographic Database: EDM RSh:-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well 18-11-Slot 11 Company: North America-ALASKA-BP TVD Reference: 18-11B ig 64.5Ousft(Parker 272(ARH= 47.10)) Project: Prudhoe Bay MD Reference: 18-110 ig 84.50usft(Parker 272(ARH= 47 1 011 Site: PB DS 18 North Reference: True • Well: 18-11 Survey Calculation Method: Minimum Curvature Wellbore: 18-118 Pilot Design: 18-118 PB1_WPD3 Project Prudhoe Bay,GPO.PRUDHOE BAY Map System: US State Plane 1927(Exact solution) • System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) • Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5.959.213.15 usft Latitude: 70°17'35.252 N From: Mae Easting: 691.58344 usft Longitude: 148'26'55.55 W Position Uncertainty: :i.3C usli Slot Radius: 0.000 in Grid Convergence: 1.46' Wel 18-11-Sic(1',10-11 We I Position +N1-S 0.00 usft Northing: 5,96O,601.04 usft . Latitude: 70°IT 48.750 N +E1-W 0.00 usft Easing: 692,198.89 usft - Longitude: 148'26 36.59 W nosMan Uncertainty 0.00 usft Wel8tead Elevation: Ground Level: 16.00 usft - Wellbore 18-11B Pilot Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (.1 inT I BGr 2C'2 672013 20.46 81.05 57,63' Des gn 18-1-B_cB'_Wp03 Audit Notes. Versio : Phase: PLAN Tie On Depth: 2,654.05 Vertical Section: Depth From(ND) +441-S CE,'-W Direction (usft) (usft) lusft) (") 48.53 OM C CO 334.6C Plan Sections Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +1114 +E!-W Rate Rate Rate TFD (usft) (°) r.F (usft) MA (usft) ('il00usft) flloousft) 0196usft) ( Target 2.654.05 2.10 234.3C 2,653.97 -2.00 -6.69 3.03 0.00 3.30 0.03 2,658.50 2.14 233.3' 2,658.42 -2.19 -6.83 1.20 0.90 -21.35 -4178 2,675.50 4.18 233.35 2675.39 -2.74 -7.58 112.00 12.00 3.30 C.O0 2,995.50 4.15 23135 2698.34 -3.61 -8.75 0.00 0.00 3.30 0.00 4.435.50 59.93 335.54 4,137.27 712.64 -409.89 3.50 3.20 5.57 104.50 8.855.50 59.93 335.54 6,266.47 4,060.70 -1,03287 0.00 0.00 0.00 0.03 9,192.90 74.00 378.80 6,464.50 4,486.88 -2,120-80 2.78 2.77 0.25 4.97 11,820.50 74.00 335.50 7,188.76 8,808.44 -3,115-83 0.00 0.00 0.00 0.00 13,040.53 35.00 328.00 7,854.50 7.679.04 -3,549.64 3.24 -3.20 -0.72 -17209 13,396.53 35.00 328.00 8,177.76 7,853.18 -3,658.45 0.00 0.00 0.00 0.03 13,721.66 59.17 330.41 8,396.16 8.055.44 -3,777.84 7.50 7.48 .375 5.05 14,323.37 59.17 330.41 8,704.50 8.504.77 4,03296 0.00 0.00 0.30 D.0O T-PilcrwpO8 14,401.54 59.17 330.41 8,744.54 8,563.11 4,066.09 0.00 0.00 3.00 0.03 f2,62'613 10:12.31AM Page 2 COMPASS 5000.!Buad 61 BP Planning Report-Geographic Database: EDM R5K-Alaska PROD-ANCP1 Local Coordinate Reference: Well 18-11-Slot 11 Company: North America-ALASKA-BP TVD Reference: 18-118 @ 64.50usft(Parker 272(ARM= 47.10)) Project: Prudhoe Bay MD Reference: 18-118 i'64 SOusft(Parker 272 tARH= 47 10j) Site: PB DS 18 North Reference.- True Well: 18-11 Survey Calculation Method: Minimum Curvature Wellbore: 18-119 Pilot Design: 18-11 B_PB 1_WP03 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +BlS +Et-W Northing Fasting )usft) r) r) (usft) (usf) (usft) iusft) (usft) Latitude Longitude 2,654..06 2.10 234.30 2853.97 -2.09 -8.69 5.960,599.39 692.19225 70°1748.729E4 148'26'36:78 W 2,658.50 2.14 233.35 2,858.42 -219 -6.83 5.980,599.28 892,192.12 72"1748.72814 148'26'36.79 W 2,675.50 4.18 233.35 2,675.39 -2.74 -7.58 5.960,598.71 892,191.38 70'1748.72314 148"26'35.81 W 2.,195 50 4.18 233.15 2,695.34 -3.61 -8.75 5,960,597.81 692,190.24 70"17 48.714 N 148'28'36.84 W 1-.-:';CO 4.14 235.46 2,699.83 -3.80 -9.01 5,960,597.61 692.189.98 7CP 17'48.713 N 148'26'36.85 W :.-de 10 4.78 280..07 2,797.86 -5.10 -15.98 5.960,595.14 892.18107 70"1748.70014 148'26'37.06 W TIP :.,,DC CO 4.81 280.74 2,709.55 -5.07 -16.12 5.960,595.16 892,18291 70"17 48.70o N 148'28'37.08 W _.:__50 4.99 283.62 2,808.02 4.92 -16.82 5,960,596.33 692,18220 701 1748.702 N 148'28'37.08 W KOP-9 S'8"Surface Casing 2,828 60 5.42 289.66 2,827.94 -4,40 -18.56 5,960.596.78 892,180.45 72"1749.707 N 148'26'37.13 W Start DLS 3.00 TFO 130.61 2,900 CO 7.32 304.40 2,899.03 -0.88 -25.40 5.060.800.31 892,173.42 70"17 48.743 N 148'28'37.33 W 3.030.00 10.42 315.26 2,907.83 9.36 -37.,2 5.060.610.05 692,161.55 70"17 48.842 N 148'26'37.67 W 3,021 C7 11.10 31175 3,018.50 12.19 -39.85 5,960,612.81 692,158.75 70"17 48.870 N 148'26'37.75 W .'3C.CO 13.71 321.03 3,095.58 25.00 -50.94 5.980,625.33 692.14733 70"1748.99614 148'26'38.07W 1..230 00 17.09 324.58 3,'91.98 48.18 -86.91 5.960,646.10 662,130..83 70"1749.204 N 148'29'38.54 W 2 1 32 17.46 324.89 3,202.50 4885 58.80 5.980,548.72 662,128.87 70"17 49.230 94 148'28'38.59 W _:: :: 20.53 328.96 3,286.64 7284 -84.97 5.960,672.28 092,112 10 704 174;.4,114 148'26'39.08 W 3'::: 23.03 328 722 3,379.23 104.86 -105.05 5.960,703.78 692091.20 70°f743" ' '4 148'26'39.85 W 27.39 330..04 3,489.33 142.13 -127.07 5,960,740.47 692,068.23 '- -: -:'4 148'2/'40.29 W ..._:CO 30.85 331,09 3,556.68 184.52 -150.96 5.960.782.23 662,043..27 : :_`.`.'.t 148'26'40.90'W ----- 34.32 331.84 3,640.92 231.85 -176.63 5,980,828.89 692,018.43 +C'17 6 _.:4 148'26'41.74W _::. 36.38 332..38 3,689.50 282.33 -192.72 5.980.858.94 69',999.53 70"17 51 _._CC 9 148'26'4221 W SV3 3.300.00 37.79 3.2..85 3,721.75 283.66 -203.98 5.060,880.28 89',987.73 70°1751.54314 148'28'4253'W 3,900.00 41.27 333.26 3,708.87 340.65 -232.90 5.980,936.21 69'.957.37 70"17 5210014 148'26'43.38 W 3,989.50 44.39 33374 3,864.50 395.10 -280.04 5,060,989.95 90',928..85 7CP 17 52.63614 148'2544.17 W SV2 4,000.00 44.75 333.80 3,871.98 401.71 -263.28 5.960,906.47 691.,925.43 7CP 175270114 148'26'44.28 W 4,100.00 48.24 334.27 3,940.81 466.91 -295.04 5,961,060.83 69',38202 70"1753.34214 148'28'45-19W 4,200.00 51.72 334.69 4,035.10 630_01 -328.03 5.961,12008 691,857 2 70P 1754.0=14 148'28'46.15 W 4.300.00 55.21 335137 4,064.63 608.75 -362.13 5.961,270.90 99',821 34 70'1754.73714 148'2147.14 W 4,400.00 58.73 335.42 4,119.15 684.88 X7.22 5.961,278.08 69',78431 70"17 55.485 84 148'26'48,17 W 4.435.50 50.03 335.54 4,137.27 712.64 -409.89 5,961.303.53 59',770.94 761 17 55.75914 148'26'48.54 W 4.500.00 50.03 335.54 4,160.59 783.45 -433.00 5.961,353.73 89',746.54 70"17 56.258 N 148'26'49_21'W 4,600.00 50.93 335.54 4,219.68 84223 488.83 5,981,431.58 69',708:.7'0 70"17 57.03314 148'28'50.26 W 4,89045 50.93 335.54 4,269.50 920.57 -504.47 5,981,508.96 59',871.07 70"17 57.80414 148'26'5129 W SV1 4,700.00 50.93 335.54 4,289.78 921.01 514.67 5.961,539.39 59',670.86 70'17 57.808 N 148'28'51.30 W 4.200.00 59.93 335.54 4,319.88 998.78 -540.50 5,961,587?" 89',633.03 70"17 58.583 N 148'26'52.35 W 4,930.00 59.03 335.54 4,360.98 1,078.56 -576.34 5,961.665.05 59'695.19 70'17 59.35714 148'20'53.39 W 5.000.00 59.93 33554 4,420.07 1,157.34 512.17 5.961.742.88 59'.557.36 70'18'0.132 N 148'28'54.43 W 5,100.00 59.03 335.54 4,470.17 1236.12 548.01 5.961,820.72 69'519..52 70''9'0.907 N 148'26'55.48 W 5,200.00 59.93 33554 4,520.27 1,314.90 -583.84 5.961,898.55 69',481.69 70'18'1.682.1 148'29'58.52 W 5,274.23 59.93 335.54 4,557.46 1373.38 -710.45 5.961,956.32 69',453.60 70'18'225714 148'26'57.30 W Start 717725 hold at 5265.73 MD 5.333.00 50.93 335.54 4,570.37 1,393.67 -719.88 5.061.976.38 69',443.85 70'18 2.45019 148'26'57.57 W 5,400.00 50.93 335.54 4,820.47 1,472.45 -755.51 5,962.054.21 69'.406.01 70'18'3.231 N 148'28'58.61 W 5,500.00 50.93 335.54 4,670.57 1,551.23 -791.35 5.982,132.04 691,388.18 70'18'4.013819 148'26'59.66 W 12/6/2013 10:12:31AM Page 3 COMPASS 5000.1 Build 61 BP Planning Report-Geographic Database: EDM R5K-Alaska PROO-ANCP1 Local Co-ordinate Reference: Well 18-11-Slot'1 Company: North America-ALASKA-BP TVD Reference: 18-1113ig,64.50usft(Parker 272(ARH= 47.10)) Project Prudhoe Bay MD Reference: 18-11B('64.50usft(Parker 272fARH= 47.10)) Site: PS D3 18 North Reference: True Well: 18-11 Survey Calculation Method: kknirrum Curvature Wel8ore: 18-118 Pilot Design: 18-11 B_PB 1_WP03 Planned Survey Measured Vertical Yap Map Depth Inclination Azimuth Depth +NIS +51W Northing Fasting lush) r) n (usft) (usft) (usfl9 (usft) (usft) Latitude Longitude 5.600.00 59.93 335.54 4,720.87 1,830.01 -827.18 5.982,209.87 69',330.34 70'18'4.781 N 148°27'0-70 W 5.700.00 59.93 335.54 4,770.77 1,708.79 -863.02 5,982,287.70 68',292.51 70'18 5.555 N 148°27'1.75 W 1,735.40 59.93 335.54 4,788.50 1,738.67 -875.70 5.962.315.25 681,279.12 70'18 5.830 N 148°27'212 W 004 5.800.00 59.93 335.54 4,820.88 1,787.56 -898.85 5.962,365.53 85',254.67 70'18'6.330 N 148°27 279 W 5.930 00 59.93 335 54 4870.96 1.88634 4934.69 5,962.443.37 85`,216.84 70'18'7.105 N 148°27 3.84 W 1,030.00 59.93 335.54 4,921.06 1.945.12 -970.52 5.962,521.20 69',179.00 70'18'7.879 N 148°27 4.88 W 6.7.00 CO 59.93 335.54 4,97'.'8 2.023.90 -1,006.38 5,962,599.03 65',741.17 70'18'13.654 M 148°27'5.93 W 6,200.00 59.93 335.54 5.02'.26 2102.88 -1.042.19 5,962,678.86 69',103.33 70'18'9.429 N 148°27 6-98 W 6,300.00 59.93 335.54 5.07'36 2.181.45 -1,078.03 5,962,754.89 65'.085.49 70'18 10.204 N 148°27'8.02 W 6,400120 59.93 335.54 5,"21.46 2,290.23 -1,113.88 5,982.832.52 65'',027-58 70'18'13.978 N 148°27'9.07 W 6,500.00 59.93 335 54 5,171.55 2339.01 -1,149.70 5,982,910.35 890089.62 710°18'11.753 N 148°2710.11 W 6,600.00 59.93 335.;.4 5,221.86 2,417.79 -1,185.53 5,982,988.18 880,951.90 72'18'12.528 N 148'27 11.16 W 6,700.00 59.93 335.54 5,271.75 2.498.57 -1,221.37 5,983,086.02 690,914.15 700 18'13.303 N '48'27'1220 W 6,800.00 59.93 335.54 5,321.85 2,575.34 -1,257.20 5.963,143.85 880,878..32 70"18'14.37714 '48°27'13..25 W 6900.30 59.93 335.54 5,371.95 265+4.12 -1,293.04 5.983,221.88 880.83848 70"18 14.852 N '48'27'14.29 W 7,000.00 59.93 335 54 5,422.05 2732.80 -1,328.87 5,963,299.51 680,800.65 70'18 15.627 N '48'27'15.34 W 7,"00.00 59.93 335.54 5,472.15 2.811.88 -1,384.70 5.963,377.34 680,78281 70'18'16.401 N '48'27'18138W 7,200.00 59.93 335.54 5,522.25 2.890.48 -1,400.54 5,963,455.17 880,724.97 70"18'17.176 N '48'27"743 W 7,21248 59.93 335.54 5,528.53 2800.29 -1,405.01 5,963,464.88 850,720.25 70'18'17.273 N 148'27'17.58 W VG' - -._-0 59.93 335.54 5,572.35 2,989.23 -1,436.37 5,963,533.07 650,887.`4 70'18 17.951 N 148°27'18..47 W -.40C CO 59.93 335 54 5,622.45 3.048.01 -1,47221 5.983,810.83 650,845.30 70'18'18.728 N 148'27'19.52 W -.500.00 59.93 335.54 5,672.54 3,128.79 -1,508.04 5.963,688.67 895,6'1.47 70"18'15.500 N '48'27 20.56 W -°ICC CO 59.93 335.54 5,722.54 3305.57 -1,543.88 5.963.768.53 690,573.83 70'18"23.275 N '48'27 21.81 W =00 59.93 335.54 5,772.74 3,284.35 -1,579.71 5,963,844.33 850,535.80 70"18'21.050114 '48'27 2266 W -,_.3C CO 59.93 335.54 5,822.84 3,383.12 -1.615.55 5.963,922.'6 690,497.96 70"18'21.824N '48'2723.70W 7,930 00 59.93 335.54 5,872.94 3,441.90 -1,851.38 5.963,999.99 690.460.13 70'18 22.599 N '48'27 24.75 W 8,000.00 59.93 335.54 5,923.04 3,520.88 -1.887.22 5,984.077.82 650,422.29 70'18 23.37414 '48'27'25.79 W 8,100.00 59.93 335.54 5,973.14 3,508.46 -1.723.05 5.984155.85 680,384.45 70'18 24.148 N '48'27 20.84'W 8,230 00 59.93 335.54 8,023.24 3,678.24 -1,758.89 5,984233.48 690,346.62 70"18'24.923 N '48'27'27.88 W 8,300.00 59.93 335.54 6,073.34 3,757.01 -1.794.72 5,964,311.32 680,308.78 70"18'25.696 N '48'27 28.93 W 8334.36 59.93 335.84 6,090.50 3,784.01 -1607.00 5.964337.98 690,295.82 70'18 25.983 4 '48'27'25 29'W WS2 8,400.00 55.93 335.54 8,123.43 3.835.79 -1630.58 5.924,389.'5 680.270..95 70'18'29.473 N '48'27 29.97 W 8,530 CO 59.93 335'4 8,173.53 3,914.57 -1,868.39 5.954,466.98 390.233.11 70'18'27.247 N '48'27"31.02 W 8630 CO 59.93 335 54 6,2223.63 3.993.35 -1,902.23 5.964,544.81 690.'95 28 70'18'28.322 4 '48'27'3206 W 8,685.50 59.93 335 54 6,286.47 4,080.70 -1,932,87 5,964.611.36 650,'62 93 70'18'28.68414 '48'27'32_98 W 8,730 00 60.34 335 58 6,273.89 4,072.15 -1.938.07 5.964.622.67 680,'57 43 70'18'28.797 N '48°27 33.11 W 8,800.00 63.11 335 85 6.32'.06 4.152.42 -1,974.28 5.984,73'.97 690.119 18 7C'18'29.588 N '48'27'34.17 W 8,930.00 65.85 336.1' 6 384 11 4334.85 -2011.02 5.984,783.43 690,080.35 73'18 30.397 N '48'27 35.24 W 9,000.00 68.85 336 35 6,47276 4,378.24 -2048.19 5.954,888.85 680.041.04 70"18 31.227 M '48'27'36.32 W 9,100.00 74.42 336 59 6.436.89 4,405.41 -2,085.71 5,964,952.02 690,001.33 70"18'32.074 N 148'27'3742 W 9,19290 74.03 336.80 6,454.53 4,488.88 -2,120.80 5.965632.56 689,984.16 70'18'32.87514 148'27'3844 W 9,200.00 74.00 336.80 6,496.46 4,493.14 -2.123.49 5.985.038.78 689,901.32 70'15 32.937 N 148'27 38.52 W 9.300.00 74.00 338-80 6,494.02 4,581.50 -2,181.36 5,865 126 11 889.921.21 70'18 33.906 N 148'27 39.83 W 9,400.00 74.00 336.80 8,52'.58 4,869.85 -2,199.23 5.965213.46 889,881.09 70"18'34.075 N 148'27'40.73 W 9,410.58 74.00 338.80 8,524.50 4,879.20 -2,203.23 5.985,222.70 689.876.85 70'18'34.786 N 148'27 40.85 W CM3 9,500.00 74.00 336.80 8,549.15 4,758.20 -2,237.09 5.965,300.81 689,840.98 70°18"35.543 N '48'27'41 84W 9,600..00 74.00 338.80 8,578.71 4,846.56 -2274.96 5,965388.16 689,830.87 70"1830.412 N '48'27 4294 W 9,700.00 74.03 336.80 6,634.27 4,834.91 -2.31283 5,985,475.51 689,750.75 7C'18 3728' "1 '48'27'44.05 W 126,2013 10:12:31AM1 Page 4 COMPASS 5000.1 Rudd 61 BP Planning Report-Geographic Database: ENO R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well 18-11-Slot 11 Company: North America-ALASKA-BP TVD Reference: 18-11B igj 94 50usft(Parker 272(ARH= 47.10)) Project Prudhoe Bay MD Reference: 18-111312 64.53uslt(Parker 272(ARH= 47.10)) Site: PB DS 18 North Reference: True Well: 18-11 Survey Calculation Method: Minimum Curvature Wellbore: 18-1113 Pilot Design: 18-11B_P131_WP03 Planned Survey Measured Vertical Map Map Depth Inclination Azinuth Depth +1111-1 +E./-W Northing Basting iusft) r) (*) (usft) (usit) (use) (ush) (usit) Latitude Longitude 9,800.00 74.03 336.80 6,631.84 5,023.25 -2,350.70 5,965,502.80 1389,720.64 TV He 38.150 N 148'27 45,15 W 9.900.00 74.03 336.80 6,659.40 5,111.62 -2,388.57 5,965,050.21 6139,081153 TIT 18'39.019 N 148'27'46_20 W 10,000.00 74.02 336.80 6,686.97 5,199.97 -2,426_44 5,965,737.56 689,640.41 70"18'39.687 N 148'2T 47 38W 10.100_00 74.03 336.80 6,714.53 5288.32 -2,464.30 5.985,624.91 689.530_32 IT'18'40.758N 1413"27'48.47 W 10200.00 74.03 3:3080 6,742.08 5,376.67 -2,50217 5,965,412.26 eiecoec •; --2 18'41.625N 148'2749_57 W 113.300.00 74.00 338.80 6,769.66 5,465.03 -2,540.04 5.935,999.61 689,520.08 -.:"18'42.494 N 148"27 50,68 W 10,400 00 74.00 330.80 6,797.22 5553.38 -2,577.91 5,966,088.96 686,479 99 -:"1843.363 N 148'27 51.79 W 10,500130 74.00 336 80 6,824.78 5,641.73 -2,615.78 5968,174.31 689,439 95 --.' 14a4.232 N 148'27'5289 W 10,600_130 74.03 am 80 6,852.35 5,733.00 -2,053.04 5.966,261.66 689,399 74 -: i 5.100N 148'27'54.00 W 10,700_133 74.03 338_80 6,879.91 5.818.44 -2,891.51 5,988,349.01 689,35922 71:"l 45.969N 148'27'55.10 W 10,808 00 74.03 336_80 0.937.46 5909.79 -2,72838 5.966,43636 689,319 51 77 18'46.838 N 148'27'56_21 W 10,930_00 74.03 33080 6,935.04 5,995.14 -2,767.25 5,966,523.71 §89.279.40 70"1847.787 N 148'27'57 37.W 11.00000 74.03 336.80 6,982.50 6,083.50 -2,805.12 5,966,611.07 689,239.28 70"18'46.576 N 148"27'5842 W 11,100.00 74.03 336.80 6,990.17 6,171.85 -2,84298 5.966,898.42 689,199.17 70°18'49.444N 148'27'59.53 W 11,200.00 74.00 336..80 7,017.73 6250.20 -2,880.85 5,968,785.77 689.159_06 77 18'58.313 N 148°28'1103 W 11,330 00 74.03 336.80 7,045.29 6,348.56 -2,918.72 5.966,873.12 689,1113_95 77 18"51.182 N 148'28'1.74W 11,395.07 74.03 336,80 7,071.53 6,432.55 -2.954.72 5.966,955.18 089090.81 77 18'82.008N l48'28'2.79W CM2 11,400 00 74.00 336_80 7,072.86 6,436.91 -2,858.58 5,966,900.47 689,078 83 77 18 52.051 N 148°28'2.64W 11,500.00 74.00 336.130 7,100.42 13,525.25 -2,994.46 5.967,047.62 689,03872 70'18'52.920 N 148°28'3.96W 11,63100 74.03 336.80 7,127.29 6,613.62 -3.032.33 5.967,135.17 6e8,99e.e1 70°18 53.78€N 148°28'5.08W 11,700.00 74.03 336.80 7,155.55 6,701.97 -3,070.19 5,967,222.52 688,958_49 70'18'54.657 N 148'28'6.16 W 11,800.00 74.00 330_80 7,183.11 6,790.32 -3,108.06 5.967,309.87 688,918.38 70°18'55.526 N 148'28'7.27W 11,820.50 74.00 336.80 7,188.78 8,808.44 -3,115.33 6.987,327.78 688,9113_16 77 18'55.7134 N 148'28'7.49W 11,600.00 71.45 330_43 7,212.37 0,878.10 -3,145.95 5.967,396.65 888.878.26 77 18 50.389 N 148°28'8.37W 12000130 68.23 335.94 7248.83 6,963.97 -3,183.85 5.967,481.52 688,838 18 77 18'57.234 N 148°28'848 W 12,100 00 85.02 335.43 7.286.50 7047.61 -3,221.84 5,967,564.18 688,79829 77 18'se.o5e N 148'28' 0.58W" 12,200.00 67.81 334.89 7,331.24 7,128.76 -3,25920 5,967,644.31 §88,758.64 77 18'58..854N 148'28 11.68W 12.308 00 58.51 334.32 7,380.92 7237.15 -3,298.41 5,967,721.72 688,719 45 77 18 50.13M NI 148'28'1.2_77 W 12,400.00 55.40 333.77 7,435.37 7,222.54 -3,333_14 5,987,796.14 688,680.80 70'78 0.386 N 148'28''3.84W 12,451.49 53.75 333.38 7,465.21 7,320.10 -3,351.83 5,967,833.21 888,061.15 70'19'0.735 N 748'28'14.38W Start DIS 4.00 TFO-177.21 12,500 00 52.20 333_06 7,404.42 7,354.68 -3,369.29 5.967.867.33 688,642 82 70'19'1.07514 148'28'74 89W 12,585.83 49.40 332,44 7,548.50 7,473.69 -3,39959 5.967,925.54 688,618_93 70'19'1.056 N 148'28'15.78W CMI 12,600 00 49.00 332.33 7,557.88 7,423.33 -3.404.73 5,967,935.05 688,635.64 70'19'1.75084 148'28'75 93 W 12,70000 45.81 331.54 7,625.55 7,488.29 -3,439.35 5.967,999.10 688,569.37 70'192 1i'.,',1 '.18'28'18.04W 12,800.00 42.63 330_65 7,897.21 7,549.34 -3,473.05 5,968,059.27 688,534_13 70°'9'2;.,:4 '4828'17.02W 12,930 00 39.45 329.65 7,772.63 7.606.29 -3,505.70 5,968,115.38 688,500_03 70' '':', :1.' '4'4 -48.26'1 Bile W 13,000_130 38.28 32857 7.951.56 7,658.96 -3,537.21 5.968,167.19 688,467 18 70 : -`4 '48'28'19,80W 13,040_53 35.00 328.00 7,884.50 7879.04 -3,549.64 5.968,188.95 688,454_25 70'194:,f'4 '48'28'20_16 W 13,080 81 35.03 328.00 7,917.50 7,698.63 -3,561_88 5.968.206.23 688,441 51 70'19'4-1f 7.'4 '45'28'20.52 W THRZ 13,100.00 35.00 328.00 7,933.22 7,707.96 -3,567.71 5.968,215.41 888,435.44 70'lir 4.54914 148'28'20.89 W 13200.00 35.00 328.00 8,015.13 7,758.61 -3,598.11 5,968,263.25 688,403.81 70°19'5.02714 148'28'21_58 W 13,240 74 35.03 328.00 8,048.50 7,776.42 -3.610.49 5.968,282.74 538,390.93 70'18 5.222 H 148'28'21.94 W BHRZITop Put River 13,300.00 35.03 328.00 8,097.05 7,805.25 -3,528.50 5,988,311.10 088,37119 70'19'5.5136 N 148'2.8'22_413 W 13,307.88 35.00 328..00 8,103.53 7,809.08 -3,630.90 5.968,314.87 688,369_70 70'195.543 N 148'28'22.53 W Base Put River/LCUIKingak A 13,329.85 35.03 328.00 8,121.50 7,819.77 -3.637.58 5,968,325.38 888,36175 70'18 5.648 N 148'28'22_73 W _ r Conductor liner 12,6,2013 10:12-31AM Page 5 COMP4 32 5900.1&aid 61 BP Planning Report-Geographic Database: EDO.,R5k.-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well 18-11-Slot 11 Company: North America-ALt..SKA-BP TVD Reference: 18-11B irp 84.50usft(Parker 272(ARH= 47.10)) Project Prudhoe Bay MD Reference: 18-11B @ 84 50usft(Parker 272(ARH= 47.10)) Site: PB 63 18 Nor-ft Reference: True Well: 18-11 Survey Calculation Method: kinimum Curfatu re Wellbore: 18-11B Pilot Design: 18-11B_PB1_WP03 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +11Y-1 *€J-W Northing Easting (usft) 11 11 (ust) lusft) (usft) (usft) lusfn Latitude Longitude 13,198...0 35.00 328.00 8,177.60 7,853.02 -3,85815 5.968,358.09 888,341.12 70'19'5.975 N 148'28'23.34W TSGR 13198.53 35.00 328.00 8,177.713 7,853.18 -3,658.45 5,968,35824 688,341.03 70'19'5.977 N 148'2823.34W 13.400 00 35.11 328.02 8,178.96 7,853.80 -3.858.90 5.068,358.94 888,340.56 70'105.984 N 148'28 23.35 W 13.442 35 38.27 328 47 8,212.01 7975.41 -3,67221 5,988,380.11 888,328.70 70'19'8.105 N 148'29'23_74 W Start 35550 hold at 1343315 MD 13,47949 4'.C.5 328.8' 8,241.53 7,895.65 -3,684.54 5.088,400.03 688,313.96 70'19'6.104 N 148'2824.10W TSHU 13,500.00 42.50 3.28.00 8,255.70 7,007.38 -3,001_81 5,968,411.55 688,333.49 70'198.509 N 148'29'241/W 13,537.12 45.39 32928 8,283.50 7,929.48 -3.704.83 5,868,433.33 888,292.71 70'19'6.727 N 148'28'24_80 W TSAR 13,800.00 50.07 329.72 8,325.70 7,809.55 -3,728.43 5.868,472.78 688,288 10 7D'19'7.121 N 1488 28'25.3f3 W 13,658.34 54.43 330.07 8,381.53 8,000.45 -3,751.55 5,968,512.07 688243.96 70'19'7.513 N 148'28'2608 W TCGL 13,700.00 57.55 330.30 8,384.80 8,038.41 -3,768_72 5.968,541.58 688228.03 70'rw 7..900N 148'28'2158 W 13,721.66 59.17 330_41 8,396.16 8,055.44 -3,777_84 5.968,557.37 888,218.51 70'19'7.986 N 148'28'26.82 W 13,784.77 50.17 333_4" 8,428.50 8,102.58 -3,804.00 5.968,033.80 688,188.55 70'19 8.429 N 148'2527.81W BCGL 13,782.35 59.17 330.41 8,432.38 8,108.23 -3,807.62 5.068,600.37 688,185.19 70'19 8.484 N 148'28'27 70 W Start DIS&fit TFO 42.24 13,806130 5917 33341 8,436.31 8,113.94 -3,811_66 5,868,615.00 688,181.81 70'10'8.541 N 148'28'27.79 W 13.892_10 59.17 33341 8,4133.50 8,182.71 -3,8513.11 5,988.882.75 888,141.01 70'19'9.217 N 148'29'28.84 W 23SB 13,960.00 56.17 330.41 8,487.55 6,188.81 -3,853_46 5.968,6E18.56 688,137.51 70'ry 9.275 N 148'28'29,ca W 13,960.40 59.17 330.41 8,518.50 8,233.72 -3,879.07 5,968,732.99 688,110.76 70'19 9.718 N 148'2829.78W 22TS 13,9912 10 50.17 330 4 t 8,531.67 8,252.01 -3.88998 5.868,751.98 1388,00938 70'19 9.907 IN 148'28'30,10 W Start 015 1.61 TFO-72.20 14,60000 58.17 330.41 8,538.79 11,263.29 -3,895.86 5,968,782.13 688,093.22 70'19'19.00914 148'28'313_27 W 14,015.64 59.17 3313,4r 8,546.50 8,274.52 -3,932.23 5,988,773.1 Q 688,086.58 70°19'10.119 N 148'29'31146 W 21T5 14,100.00 59.17 330.41 8,590.04 8,337.97 -3,038.26 5,968,835.89 688,048_93 70'19 19.743 N 148'29'31 51 W 14,188.48 50.17 330,41 8,640.53 8,411.50 -18E10_01 5.9138,008.'3 688,005_31 70°19'11.48814 148'28'32.73 W TZ1B 14,200 00 58.17 33041 8,641.28 8,412.84 -3,983.85 5.938.009.25 688,004.64 70°19'11.47714 148'213'32 75 W 14,288,73 59.17 330_41 8,876.50 8,463.06 4,08979 5,988,959.81 687,874.20 70°19'11.98214 148'28'33 00 W TDF 14,300.00 59.17 330.41 8,892.53 8,487.32 4,023.05 5,968,982.81 687,960.35 717 19'12.212 N r4e*28'33J98 W 14,323 37 58.17 330 41 8,704.53 8,504.77 4032.06 5,960.000.00 687,95600 719°19'12383 N 148'28'34.28 W BSAD 14,400.00 59.17 33141 8,743.77 8,561.90 4,065.45 5,866.058.38 687,918_05 73'19'12.846114 148'28'35,.M W 14,401.43 50.17 330.41 8,744.50 8583.06 4,09108 5.969,057.42 687,915.42 70'19'12.95614 148'28'35.24W 4 112-Production Liner 14,401.50 59."7 330.41 8,744.54 8,5133.11 4,05809 5,989,057.48 687,915.39 708 19'12.957 N 148'28'35_24 W 12/6/2013 10:12:31AM Page 6 COMPASS 5000.1 Build 61 North America - ALASKA - BP Prudhoe Bay PB DS 18 18-11 - Slot 11 500292118100 18-11B Plan: 18-11 B WP10 Standard Planning Report - Geographic 06 December. 2013 BP Planning Report-Geographic Databaae: EDI,R54(-leasSa PROD-ANCP1 Local Co-ordinate Reference: Wel 18-Il-$lca 11 Company: North America-ALASKA-BP TVD Reference: 18-11B Q 64.50ualt parker 272(ARN- 47.10)) Project Pniclhoe Bay MD Reference: 18-1113 ig 64.50u5it!Palter 272(MI-1-47.10)j Site: P13 DS 16 North Reference: True Well: 16-11 Survey Calculation Method: Mennen Curature Wellbore: 18-1113 Design: 15-116_WP10 Project Prudhoe Bay,GPO,PRUDHOE BAY Map System: US State Pane 1927 rEica:a solution:, System Datum: Veal Zea Level Geo Datum: NAD 19271:14ADCON°ONUS' Jamg Wel Reference Pont Map Zone: Amita Zane 04 Using geodeult scae factor Site P6 DS 18,TR-11-14 Site Position: Northing- 5,959,213.15 tan Lattlude: 70*1735252 N .rom Vap Baiting: 691,583.44 ief Longitude: 146'26'55.55 Ve Position Unceralnty: O011 ash Slot Radius: 0.000 In Grid Convergence: 1.45• Well 1!-''-Giol 11,16-1, Well Position -14-5 0.00 151 Northing: 5,960,601.64 mil Latitude: 70 17"46.7513 N +D-Vi 000 call Eaating 692,196.89 Lea Longitude: 145*26'36.59 W Position Uncertainty LOO usl Wellhead 514,r Won: Ground LENC: 1c00 lull Wellbore 10-" 14129ns-ice Nadal New Sample Date Declination Dip Angle Fleld Strength ton ESG142313 '01122:7 2:C. 01.02 57,645 Ls,sign 2 J VI NO:fit ".O'i lor Phase: PLAN Tie tin Depth I 3K::" Mph From mu' 441-S .E-W Directica Ileelti haft! (11en) In 4a.sc 0.2: 2 2'2 28'30 Plan Sections Measured 'oartical Dogleg Build Turn Depth Inclination 42:irmulh Depth -41,-11 .1644411 Rate Rate Raft 11F0 (ion) 11 Nom two NM rtiootram rrlowen) (1100uffit) rl Target 13,855.02 59.17 330.4.: 9444.50 81,155.03 -3.534.39 0.00 3.00 0.00 0.00 13,905.02 55.73 327.95 3,491.0 6,191.23 -3.555.95 6.00 -6.68 4.64 210.00 14,305.02 74.0C 306.00 8022.45 8,446.60 -4,105.57 6.69 4.57 -5.75 -54.24 14,536.05 91X 3E6.130 9,694.50 8,577.40 -4,292.67 6.93 693 0.00 0.00 15,699.47 93.00 2713.10 5,6941.50 6,922.74 -5.384.87 3.50 Top -.3.00 -90.00 16,0430.54 9100 270.10 8.594.50 8,923.30 -5,665.94 11.130 0.00 0.00 0.130 16,055.54 9100 266.45 8,694.50 8,922.61 -5,740.93 3.00 0.00 -3.00 -90z0 15.3 new 18,915.54 913C 268.45 8,694.511 8,645.18 4,599_139 0.013 0.0C 0.00 90.130 19,095.133 97.1e 268.42 9,653.27 8,840.30 4,775.61 4.00 4.00 -0.01 -0.20 19,24523 97.16 28842 8.6€4.50 8,635.20 -8,927.50 1100 0.00 0.00 0.00 15.5 nee 19,405.23 97.15 258.42 6,644.51 8,831.54 -9,066.49 0.00 0.00 0.00 0.00 1Z'012013 10•11:06AAf Page 2 COMPASS 5006 1 Bona 01 BP Planning Report-Geographic Database: EDM R51<-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well 18-11-Mot 11 Company: North America-ALASKA-BP TVD Reference: 18-11B,.84.50usf(Parker 272(ARH= 47.10)) Project Prudhoe Bay MD Reference: 18-11B©64.50usft(Parker 272(ARH= 47.10)) Site: P8 DS 18 North Reference: True Well: 18-11 Survey Calculation Method: Minimum Curvature Wellbore: 18-118 Design: 18-11B_WP'3 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +81,-5 +EJ-W Northing Easting (usft) (°) (°) (usft' 1.1510 (usft) (usft) (usft) Latitude Longitude 13,855.02 59.17 333.41 8,484.50 8,155.03 -3,834.39 5.368,655.47 688,157.44 70'19'8.945 N 148'28'28.48 W 13,890.82 56.70 328.70 8,483.50 7181.18 -3,849.75 5.968,681.22 688,141.41 70'19'9.202 N 148'28'28.92 W 2358 13.900.10 56.08 328.25 8,488.58 8..187.70 -3,853.75 5.968,687.64 688,137.25 70'19'9.286 N 148'28'29.04 W 13,905.02 55.73 327.99 8,431.43 8,191.23 -3,855.95 5.988.891.11 688,134.96 70'19'9.301 N 148°28'20.11'W 13.954.44 57.77 324..73 8.518.50 8,225.82 -3,878.85 5.968,724.91 888,111.19 70'19'9.639 N 148'28'28.77'W 22TS 13,988.10 50.11 322.71 8,535.07 8,247.38 -3,894.81 5.968,746.23 688,094.68 70'19'9.852 N 148'28'3024 W Start DLS 8.68 TFO-72.20 14,000.00 59.71 321.85 8,542.14 8,256.83 -3,932.13 5.968,755.50 688,087.12 70'19'9.946 N 148°28'30 45'W 14,008.68 60.09 321.31 8,546.50 8.,282.71 -3,906.80 5,968,781.27 688,082.30 70'19'10.00314 148°28'30.59 W 21TS 14,100.00 64.19 315.60 8,589.19 8.323.18 -3,960.20 5.988,820.35 688,027.38 70'19'10.598 N 148'28'32.15 W 14,200.00 68.80 3104' 8, 9.02 8,385.82 4,027.12 5.968,881.25 687,958.88 70'19'11.213 N 148'28'34.10 W 14,233.07 70.48 308.67 8,64n 53 8,405.56 4,051.03 5.968,030.37 687.934.47 70°18'11.407 N 148'228'34.80 W TZ1B 14,300.00 73.75 305.25 8,66'.06 8,443.83 4,101.92 5.988.837.33 587,882.62 70°19'11.784 N 148'28'38.29W 14,305.02 74.03 305.00 8,662.45 8 446.60 4,105.87 5.968,840.00 687,878.69 70'19'11.811 N 148'28'36.40 W 14,363.16 78.03 305.00 8,6.76.50 8.479.05 4,152.07 5,968,971.15 687,831.59 70°19"12.129 N 148'28'37 75 W TDF 14,400.00 80.58 305.00 8,683.34 8.499.72 4,181.72 5.968,89'.15 887,801.42 70°19'12.333 N 148'28'38.62'W 14,500.00 87.50 30500 8.56371 8,566.73 4,263.15 5.969,048.06 887,718.57 70'19'12.893 N 148'28'40.99 W 14,536.05 90.00 305.00 8,834.53 8,577.40 4,222.67 5.969,065.97 687,688.53 70°19'13.098 N 148'28'41.88 W 14,600.00 90.03 303.08 8,694.53 8..613.20 4.345.66 5.969,130.40 687,634.85 70.19'13.448 N 148'28'4340 W 14,700.00 90.03 303.08 8,684.53 8,885.58 4,430.84 5,969.150.56 887,548.16 70'191 13.982 N 148'28'45 89 W 14,830.00 90.09 297.08 8,694.53 8.713.40 4,518.64 5,969,196.13 887,459.17 70"18'14.432 N 148'28'4845 W 14,831.85 90.03 296.13 8.694.53 8,727.57 4,546 94 5.369,299.58 687,430.52 70°18'14.572 N 148'28'49.28 W Start OLS 755 TFO 91.37 14,900.00 90.00 294.08 8,694.53 8,758.57 4,608.83 5,960,238.99 687,387.91 70'19'14.858 N 148'28'51.09'W 15,000.00 90.03 291.08 8,634.50 8,794.97 4,731.'5 5,980.273.01 687,274.64 70°19'15.234N 148'28'53.78 W 15,100.130 90.03 288..C8 8.694.53 8.828.48 4.795.36 5.989.304.09 687,178.62 70"18'15.563 N 148'28'56.53 W 15,200.00 90.03 285.08 8,694.53 8,857.01 4,891.'9 5.969.330.17 687,083.09 70°19'15.843 N 148'28'59.33 W 15,206 59 90.03 284.88 8,694.53 8.858.72 4.897.55 5.960,331.71 687,076.69 7C"159 15.850 N 148'28'59.51 W Start DLS 055 TFO-$8.64 15,300.00 90.00 282.08 8,884.53 8,890.49 4.988.38 5.960,351.15 688,085.34 70"19'16.073 N 148°29'2.16 W 15,400.00 90.00 279.08 8,894.53 8,808.86 -5,088.67 5,969,366.99 688,886.62 700 19'16.253 N 148°28'5.03 W 15,500.00 90.00 278.08 8,694.53 8,912.06 -5.185.78 5,969,377.65 686,787.20 70"19"16.382 N 148°29'793 W 15,600.00 90.00 273.08 8,694.53 8,920.03 -5,285.45 5.969.383.08 688,687.37 70"10'16.460 N 148'29'10.83 W 15,009.47 90.00 270.10 8,894.53 8.922.79 -5,384.87 5,969,383.30 686,587.92 70'19'10.486 N 148'29'13_74 W 15,700.00 90.00 270.10 8,634.53 8,622.79 5,38543 5.969,383.28 686,587.39 70'19'16.488 N 148'29''3 75 W 15,800.00 90.00 270.10 8,894.53 8,92296 -5,485.40 5.969,380.80 688,487.42 70'19'18.487 N 148'29''6.87 W 15,900.00 90.00 270.10 8,684.53 8,823.13 -5,585.40 5,969,378.51 688,387.45 70°19'10.488 N 147 29'19.59 W 16,000.00 90.00 270.10 8.894.53 8,623.30 5.685.40 5.969.376.12 686,287.49 70°17 16.489 N 148'29'22.51 W 18,000.54 90.00 270.10 8,694.52 8..923.30 5.685.94 5,969.376.11 688,288.95 70°19'16.489 N 148'29'22.52W 18.055.54 90.00 268.45 8,894.53 8,922.81 5,740.93 5,960,374.00 686,232.00 70'19'18.482 N 148'29'24.13 W 16,100.00 90.00 268 45 8,594.52 8,921.40 -5,785.38 5.969,371.86 686,187.60 70'19'16.470 N 148'29'25.42 W 18,111.81 90.00 268.45 8,664.53 8.921.08 5,797..18 5,969.371.04 686,175.81 70°19:16.466 N 148'29'25.77 W Start DLS 5.50 TFO-88.29 16,200.00 90.03 26845 8,694.52 8..918.68 5,885.34 5.969,386.40 686,087.74 70°19'16.442 N 148'29'28.34 W 16,299.46 90.03 268 45 8.694.53 8.9'9.00 -5,984.76 5.969,381.16 685,988.43 70°19'16.415 N 148'20'31.24 W Start DLS 2.00 TFO-95.77 12602013 10:11:06.41,4 Page 3 COMPASS 5000.1 Breild 61 Database: EDM R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well 18-11-Slot 11 Company: North America-ALASKA-BP TVD Reference: 18-1113 @ 64.S0usft(Parker 272(ARH= 47.10)) Project: Prudhoe Bay MD Reference: 18-118 @ 64.50usft(Parker 272(ARM= 47.10)) Site: PB DS 18 North Reference: True Well: 18-11 Survey Calculation Method: Minimum Curvature Wellbore: 18.11 B Design: 18-11 B_'WP1G Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +1Ys +€i-W Northing Easting Wet) 1°1 (% (uaft) (usf) (usft) 11101 haft) Latitude Longitude 16,300.00 90.00 268.45 8,694.50 8.915.98 -5,985.31 5,969,361.13 685,987.89 70'19'16.415 N 148'29'31.26 W 16,377.30 90.00 268.45 8,694.50 8,913.89 -6,062.57 5,969,357.07 685,910.70 70°19'16.394 N 148'29'33.51 W Start 2847.40 hold at 16368,80 MD 16.400.00 90.00 268.45 8,694.50 7913.27 -6,085.27 5,969,355.87 685,888.03 70'19'16.387 N 148'29'34.18 W 16,500.00 90.00 268.45 8,694.50 8910,57 -6.185.23 5,969,350.61 685,788.18 70'19'16.360 N 148'29'37.09 W 16,600.00 90.00 268.45 8,694.50 8,907.86 -6,28520 5,969,345.34 685,688.32 70'19'16.332 N 148°29'40.01 W 16,700.00 90.00 268.45 8,694.50 8,905.15 -6,385.16 5,969,340.08 685,588.46 70'19'16.305 N 148'29'42.93 W 16,800.00 90.00 268.45 8,694.50 8,902.44 -6,485.12 5,969,334.82 685,488.61 70°19'16.278 N 148'29'45.84 W 16,900.00 90.00 268.45 8,694.50 8.,899.73 -6.585.09 5,969,329.55 685,386.75 70°19'16.250 N 148'29'48.76 W 17,000.00 90.00 268.45 8,694.50 8,897.02 -6.685.05 5,969,324.29 685,288.90 70'19'16.223 N 148'29'51-68 W 17.100.00 90.00 268.45 8,694.50 8,894.32 -6.785.01 5,969,319.03 685,189.04 70°19'16.195 N 148'29'54..60 W 17,200.00 90.00 268.45 8,694.50 8.891.61 -6,864.98 5,969,313.76 685,089.19 70'19'16.167 N 148'29'5751 W 17,300.00 90.00 268.45 8,694.50 8,888.90 -6.984.94 5,969,308.50 684.989.33 70'19'16.140 N 148'30'0.43 W 17.400.00 90.00 268.45 8.694.50 8.886.19 -7.064.90 5,969,30324 684.889.48 70'19'16.112 N 148'30'3.35 W 17,500.00 90.00 268.45 8,694.50 8„883.49 -7.184.87 5,969,297.97 684.789.62 70'19'16.085 N 148'30'6.26 W 17.600.00 90.00 268.45 8,694.50 8,880.78 -7284.83 5.969,292.71 684.689.76 70'19'16.057 N 148'30'9.18 W 17.700.00 90.00 268.45 8,694.50 8.878.07 -7.384.79 5,969,28745 684,589.91 70°19'16.030 N 148'30'12.10 W 17.800.00 90.00 268.45 8.694.50 8,875.37 -7.484.76 5.969282.19 684.4913.05 70'19'16.002 N 148'30'15.02 W 17.900.00 90 00 268.45 8,694.50 8..872,66 -7.584.72 5,969,276.93 684.390.20 70'19'15.975 N 148'30'17 93 W 18,000.00 90.00 268.45 8,684.50 8,869.95 -7.684.68 5,969271.66 684.290.34 70'19'15.947 N 148°30'20.85 W 18.100.00 90.00 268.45 8.694.50 8.86725 -7.784.65 5,969,266.40 684,190.49 70'19'15.919 N 148'30'23.77 W 18.200.00 90.00 268.45 8,694.50 8 864.54 -7 884.61 5,969261.14 684.090.63 70'19'15.892 N 148'30'26.68 W 18.300.00 90.00 268.45 8,694-50 8,861.83 -7.984,57 5.969,255.88 683,990.77 70'19'15.864 N 148°30'29.60 W 18.400.00 90.00 268.45 8,694.50 8 859.13 -6.084.54 5,969,250.62 683,890.92 70'19'15.836 N 148'30'3252 W 18.500.00 90.00 268.45 8,694.50 8.856.42 -8.184.50 5,969,245.36 683,791.06 70'19'15.809 N 148'30'35.44 W 18,600.00 90.00 268.45 8,694,50 8.853.72 -8284.46 5.969,240.10 683.691.21 70°19'15.781 N 148'30'38.35 W 18.700.00 90.00 268.45 8,694.50 8,851.01 -8.384.43 5,969,234.84 683,591.35 70'19'15.753 N 148'30'41.27 W 18.800.00 90.00 268.45 8,694.50 8 848.31 -8.484.39 5,969,229.58 683,491.50 70'19'15.726 N 148'30'44.19 W 18.900.00 90.00 268.45 8,694.50 8.845.60 -8 564.35 5,969,224.32 683,391.64 70'19'15.698 N 148'30'47.10 W 18.915.54 90.0D 268.45 8,694.50 8.845.18 -8.599.89 5,969,223.50 683,376.12 70'19'15.694 N 148'30'47.56 W 19000.00 93.38 268.44 8,69201 8,842.89 -8.684.27 5,969219.05 683291.83 70'19'15.670 N 148'30'50.021 19.095.00 97.18 268.42 8,683.27 8.640.30 -8.778.81 5,969214.04 683,197.39 70'19'15.644 N 148'30'5278 W 19,100.00 97.18 268.42 8,682.65 8 840.16 -8.783.77 5,969,213.78 683.192.44 70°19'15.642 N 148'30'52.92 W 19.200.00 97.18 268.42 8.670 15 8.637.44 -8,882.95 5,969208.52 683,093.37 70'19'15.614 N 148'30'55.82 W 19,224.69 97.18 268.42 8,667.07 8,836.76 -8.907.44 5.969,207.22 683.068.91 70'19'15.607 N 148'30'56-53 W TD at 19216.19-4112"Production liner 19,245.23 97.18 268.42 8,664.50 8 83620 -8 927.80 5,969,206.14 683.048.56 70°19'15.601 N 148'30'57.13 W 19.300.00 97.18 268.42 8,65766 6.834.71 -8.982.13 5,969,203.26 682,994.30 70°19'15.586 N 148'30'58.71 W 19,400.00 97.18 268.42 8,645.16 8831.98 -9.081.31 5,969,197.99 682.89523 70'19'15.558 N 148'31'1.61 W • 19,405.23 97.18 268.42 8,644.51 8831.84 -9.066.49 5,969,197.72 682,890.05 70'19'15.557 N 148'31'1.76 W 12/620f3 10:11:06AM Page 4 COMPASS 5000.1 Build 61 , nvvesia, Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18.11-Slot 11 Project: Prudhoe Bay TVD Reference: 18-11B @ 64.S0usft(Parker 272(ARH=47.10)) Reference Site: PB DS 18 MD Reference: 18-116 fp.64.50usft(Parker 272(ARH=47.10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 18-118 Pilot Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 18-118_PB1 WP03 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usftl (usft) (usft) Lis DS 01 11-01-L1-01-L1-01 14,085.52 11250.00 488.58 319.00 178.@4 Pass-Major Risk L1-01-Plan 1119 L1-01A-Plan*119 14,085.52 11,250.00 488.58 319.21 175.82 Pass-Major Risk Lis DS 02 L2-07-12-07-L2-07 11206.11 9.025.00 100.14 324.65 -222.32 FAIL-Major Risk L2-07-L2-07A-L2-07A 11.206.11 9,025.00 100.14 32425 -221.92 FAIL-Major Risk L2-07-12-07APB1-L2-07APB1 11206.11 9,025.00 100.14 32425 -21.92 FAIL-Major Risk L2-13-12-13-L2-13 5725.55 5,525.00 867.89 102.41 76922 Pass-Major Risk L2-13-L2-13A-L2-13A 5725.55 5,525.00 867.89 102.41 769.22 Pass-Major Risk L2-21-L2-21-L2-21 6.845.69 6,000.00 57.54 116.64 -57.30 FAIL-Major Rsk L2-21-L2-21A-L2-21A 6..845.69 6,000.00 57.54 116.64 -57.30 FAIL-MaporRsk L2-21-L2-21A-Plan#20d 6,845.69 6.000.00 57.54 116.64 -57.30 FAIL-Major Risk 12-25-L2-25-12-25 8,206.65 6.650.00 970.61 163.59 850.63 Pass-Major Risk L2-29-12-29-L2-29 8.860.48 7.775.00 1,481.41 174.97 1,328.69 Pass-Major Risk NGI NGI-01-NGI-01-NGI-01 Out of range PB DS 18 18-01-18-01-18-01 3234.91 3225.00 489.31 52.74 436.55 Pass-Major Risk 18-01-18-01A-18-01A 3,234.91 3,225.00 489.31 52.74 436.55 Pass-Valor Risk 18-02-18-02-18-02 3.359.19 3,300.00 498.81 53.85 4.44.97 Pass-Mayor Risk 18-02-18-02A-18-02A 3258.72 3,300.00 498.79 53.83 444.97 Pass-Major Risk. 18-02-18-02APB1-18-02APB1 3,358.72 3,300.00 498.79 53.83 444.97 Pass-Mala Risk 18-CC-18-026-18-02B 3259.19 3,300.00 498.81 53.67 445.14 Pass-Mayor Risk 18-02-18-02C-18-02C 4,100.00 4,150.00 359.48 71.53 293.53 Pass-Major Risk 18-02-18-02CPB1-18-02CPB1 4.100.00 4,150.00 359.48 71.53 293.53 Pass-Major Risk 18-03-18-03-18-03 3.435.64 3.350.00 515.63 47.49 468.48 Pass-Mapor Risk 18-03-18-03A-18-03A 3,436.13 3.350.00 515.65 47.39 468.60 Pass-Major Risk 18-03-18-038-18-038 3.436.67 3.350.00 515.66 47.29 468.71 Pass-Mor Risk 18-03-18-03C-18-03C 3.436.67 3.350.00 515.66 47.39 468.60 Pass-Mayor Risk. 18-04-18-04-18-04 2689.77 2,675.00 798.43 38.90 760.10 Pass-Malor Risk 18-04-18-04A-18-04A 2.689.77 2675.00 798.43 38.90 760.10 Pass-Major Risk 18-04-18-048-18-048 2,654.39 2650.00 794.54 38.18 756.89 Pass-Major Risk 18-04-18-04BPB1-18-048PB1 2.654.39 2650.00 794.54 38.40 756.68 Pass-Major Risk 18-04-18-040-18-04C 2.654.39 2.650.00 794.54 38.55 756.52 Pass-Major Risk 18-04-18-04C-Plan 8 2654.39 2650.00 794.54 38.12 756.96 Pass-Major Risk 18-05-18-05-18-05 2.692.62 2,725.00 1,107.48 57.53 1,059.77 Pass-Major Risk 18-05-18-05A-18-05A 2.694.83 2725.00 1,108.55 57.73 1,060.73 Pass-Major Risk 18-05-18-05A-18-05A wp07 2.694.83 2725.00 1,108.55 57.89 1,060.57 Pass-Major Risk 18-06-18-06-18-06 4.064.17 3,725.00 673.60 66.95 611.44 Pass-Major Risk 18-06-18-06A-18-06A 4.058.50 3.725.00 673.53 66.73 611.50 Pass-Major Risk 16-06-18-068-18-068 4.058.50 3.725.00 673.53 66.73 611.50 Pass-Major Risk 18-07-18-07-18-07 4.149.90 3.625.00 772.72 54.11 723.78 Pass-Major Risk 18-07-18-07A-18-07A 4.164.71 3,625.00 773.01 5427 723.79 Pass-Major Risk 18-07-18-07APB 1-18-07APB1 4.164 71 3.625.00 773.01 54.27 723.79 Pass-Major Risk 18-07-18-07AP82-18-07AP82 4.164 71 3,625.00 773.01 5427 723.79 Pass-Major Risk 18-08-18-08-18-08 4 305.22 3.650.00 852.27 61.50 796.52 Pass-Major Risk 18-08-18-08A-18-08A 4.300.82 3.650.00 85223 61.44 796.57 Pass-Major Risk 18-08-16-08AP81-18-08APB1 4.300.82 3,650.00 85223 61.44 796.57 Pass-Major Risk 18-08-18-086-18-088 4.300.82 3.650.00 85223 61.44 796.57 Pass-Major Risk. 18-08-18-088P81-18-08BPB1 4.300.82 3.650.00 85223 61.44 796.57 Pass-Major Risk 18-09-18-09-18-09 2.686.04 2.700.00 1.376.54 55.15 1,322.18 Pass-Major Risk 18-09-18-09A-18-09A 2.686.04 2 700.00 1.376.54 55.15 1,322.18 Pass-Major Risk 10/282013 4..09:47PM Page 3 of 6 COMPASS 5000.1 Staid 61 BP IGa� bp Anticollislon Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-11-Slot 11 Project Prudhoe Bay TVD Reference: 18-118 @ 64.50usft(Parker 272(ARH=47.10)) Reference Site: PB DS 18 MD Reference: 18-119©84.50usft(Parker 272(ARH=47.10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.O0usft Output errors are at 1.00 sigma Reference Wellbore 18-119 Pilot Database: EDM R51.c-Alaska PROD-ANCP1 Reference Design: 18-11B_P81_WP03 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warn n Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design {usft) (usft) {usft) (usft) °B DS 18 18-09-18-09B-18-098 2,686.04 2.703.00 1,376.54 55.15 1,322.18 Pass-Major Risk 19.09-Plan 18-09C-Plan 2 2,686.04 2.703.00 1,376.54 54.84 1,322.48 Pass-Major Risk 18-09-Plan 18-09CPB 1-Plan 2 2,688.04 2,703.00 1,376.54 54.84 1,322.48 Pass-Major Risk 18-10-18-10-18-10 5,014.78 3,625.00 1,479.91 158.07 1,388.74 Pass-Major Risk 18-10-18-10A-18-10A 5,015.83 3.625.00 1,479.96 158.33 1,388.58 Pass-Major Risk. 18-10-18-10APB 1-18-10APB 1 5,015.63 3,825.00 1,479.96 158.33 1,388.58 Pass-Major Risk 18-10-18-10APB2-18-10APB2 5,015.63 3,625.00 1,479.96 158.33 1,388.58 Pass-Major Risk 18-10-18-10B-18-108 5,015.63 3,625.00 1,479.96 155.88 1.389.32 Pass-Major Risk 18-10-18-10C-18-10C 5,015.63 3,625.00 1,479.98 155.87 1.389.34 Pass-Major Risk 18-10-18-10CP81-18-10CPB1 5,015.83 3,625.00 1,479.96 158.33 1,388.58 Pass-Major Risk 18-11-18-11-18-11 2,658.47 2.85000 1.66 32.70 -31.01 FAIL-Major Risk 18.11-18-11A-18-11A 2,683.49 2,1375.00 0.54 1.32 -0.75 FAIL-Major Risk 18-11-18-11B-18-11B_WPID 13.875.00 13,875.00 0.28 0.91 -0.50 FAIL-Major Risk 18-11-18-11DPN-18-11DPN 2,683.49 2,675.00 0.54 1.82 -1.05 FAIL-Major Risk 18-12-18-12-18-12 2,687.06 2803.00 587.05 45.52 547.35 Pass-Major Risk 18-12-18-12A-18-12A 2,667.06 2.803.00 587.05 45.52 547.35 Pass-Major Risk 18-12-18-12B-18-12B 2,687.06 2,803 00 587.05 45.52 547.35 Pass-Major Risk 18-12-18-12C-18-12C 2,662.88 2.803.00 581.99 45.36 542.36 Pass-Major Risk 18-12-18-12C-18-12C WP 18 2,658.53 2803.00 581.36 45.33 541.77 Pass-Major Risk 18-12-18-12C Contingency-18-12C Contingency 2,682.88 2803.00 581.96 45.39 542.37 Pass-Major Risk 18-13-18-13-18-13 3,414.77 3,375.00 124.48 45.67 78.82 Pass-Major Risk 18-13-18-13A-18-13A 3,408.82 3,375. 0 124.46 45.59 78.92 Pass-Major Risk 18-13-18-138-18-13B 3,4C8.82 3,375.10 124.49 45.59 78.92 Pass-Major Risk 18-13-18-138P91-18-138P8'. 3,408.92 3,375.00 124.49 45.56 78.92 Pass-Major Risk 18.13-18-138P82-18-138P82 3,408.92 3,375.00 124.49 45.59 78.92 Pass-Major Risk 18-13-t 8-138PB3-18-138P83 3,408.92 3,375.00 124.49 45.56 78.92 Pass-Major Risk 18-13-18-13C-18-13C 3,408.£2 3,375.00 124.49 45.59 78.92 Pass-Major Risk 18-13-t8-13P91-18-13P131 3,414.77 3,375..00 124.48 45.67 78.82 Pass-Major Risk 18-13-18-13P82-18-13P92 3,414.77 3,375..00 124.48 45.67 78.82 Pass-Major Risk 18-14-18-14-18-14 3,790.39 3,701.00 148.88 54.49 94.37 Pass-Major Risk 18.14-18-14A-18-14A 3,792.23 3,700.00 148.70 54.52 94.40 Pass-Major Risk 18-14-18-14AP81-18-14APB1 3,792.23 3,700.00 148.70 54.52 94.40 Pass-Major Risk 18-14-18-148-18-14B 3,793.28 3,700.00 148.73 54.53 94.42 Pass-Major Risk 18-14-t8-14C-18-14C 3,783.28 3,703.00 148.73 54.53 94.42 Pass-Major Risk 18-15-18-15-18-15 3,783.67 3,860..00 251.11 54.84 196.61 Pass-Major Risk 18.15-18-15A-18-15A 3,783.75 3.850.00 251.11 54.84 196.81 Pass-Major Risk 18-15-18-75AP81-t8-15APB1 3,783.75 3,850.00 251.11 54.84 196.61 Pass-Major Risk 18-15-18-15B-18.158 3,763.67 3,650.00 251.11 54.84 196.81 Pass-Major Risk 18-15-18-15C-18-15C 3,783.75 385300 251.11 54.84 196.81 Pass-Major Risk 18-15-18-15CPB1-18-15CP81 3,763.75 3.85300 251,11 54.84 196.81 Pass-Major Risk 18.16-18-18-18-18 3,989.21 3,803 00 298.58 64.08 233.21 Pass-Major Risk 18-16-18-16A-18-16A 3,989.21 3,803.00 298.58 64.09 233.21 Pass-Major Risk 18-16-18-169-18-168 3,989.21 3,80000 296.58 64.09 233.21 Pass-Major Risk 18-17-18-17-18-17 2,709.77 2800.00 1,288.95 60.02 1,212.46 Pass-Major Risk 18-18-18-18-18-18 4,496.23 4,150.00 231.13 85.18 186.11 Pass-Major Risk 18-18-18-18A-18-18A 4,496.23 4,150.00 231.13 65.18 166.11 Pass-Major Risk 18-18-18-18APB1-18-18APB1 4,496.23 4.150.00 231.13 65.18 186.11 Pass-Major Risk 18-18-18-18B-18-188 4,496.23 4,150.00 231.13 85.18 168.11 Pass-Major Risk 18-18-18-18BPB1-18-18BPB1 4,496.23 4.150.00 231.13 65.18 168.11 Pass-Major Risk 18-19-18-19-18-19 2,697.31 1700.00 815.21 49.28 766.83 Pass-Major Risk 18-20-18-20-18-20 2,681.13 2875.00 825.74 57.02 773.20 Pass-Major Risk 18-21-18-21-18-21 2,656.72 2800.00 815.90 44.81 576.67 Pass-Major Risk 18-21-18-21A-18-2'- 2,656.72 2 80)CC, 515.9C 44.81 575 57 Fos=-Major Risk 10/28/2013 4:09:47PM Page 4 of 6 COMPASS 5000.1&.rid 61 BP reams by Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Coordinate Reference: Well 18-11-Slot 11 Project Prudhoe Bay TVD Reference: 18-118©64.50usft(Parker 272(ARH=47.101. Reference Site: PB DS 18 MD Reference: 18-116(64.50usft(Parker 272(ARH=47.101. Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00uslt Output errors are at 1.00 sigma Reference Wellbore 18-118 Pilot Database: EDM RSK-Alaska PROD-ANCP1 Reference Design: 18-118 PB1_WP03 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design I usft) lust) (usft) (usft) PB DS 18 18-21-18.218-18.216 2,863.24 282580 621.46 44.99 582.12 Pass-Major Risk 18-21-18-218-18-218 Plan 9 2,663.27 21325.CO 621.49 44.99 582.15 Pass-Major Risk 18-22-18-22-18-22 2680.26 285080 145.84 33.28 112.88 Pass-Major Risk 18-22-18-22A-18-22A 2,660.26 2650.00 145.84 33.29 112.89 Pass-Major Risk 18-23-18.23-18-23 4,284.87 4.060.00 320.17 57.64 262.61 Pass-Major Risk 18-23-18-23A-18-23A 4,273.27 4,025.00 319.84 57.52 262.54 Pass-Major Risk 18-24-18-24-18-24 3,634.57 3,575.00 163.61 50.18 107.67 Pass-Major Risk 18-24-18-24A-18-24A 3,835.59 3,575.00 183.63 56.22 107.67 Pass-Major Risk 18-24-18-24AL1-18-24AL1 3,835.69 3,575.E 183.83 56.22 107.67 Pass-Major Risk 18-24-18-24AL2-18-24AL2 3,835.89 3,575.00 183.83 56.22 107.67 Pass-Major Risk 18-24-18-248-18-24B 3,835.69 3,575.00 183.03 56.22 107.67 Pass-Major Risk 18-25-18-25-18-25 2,865.32 2,825.50 572.32 159.33 415.68 Pass-Major Risk 18-25-18-25A-18-25A 2,858.53 2,80080 588.88 159.54 412.01 Pass-Major Risk. 18-25-18-25AP81-18-25APB1 2,864.96 2825.50 571.84 159.48 415.14 Pass-Major Risk 18-26-18-26-18-28 5,483.52 4.660.00 77.90 101.72 -20.98 FAIL-Major Risk. 18-26-18-28A-1 B-26A 5,163.52 4,850.03 77.90 101.72 -20.98 FAIL-Major Risk 18-26-18-26AP81-18-26APB1 5.163.52 4,660.00 77.90 101.72 -20.98 FAIL-Major Risk 18-26-18-25AP82-18-26APB2 5,163.52 4,860.00 77.90 101.72 -20.98 FAIL-Major Risk 18-28-18-268-18-268 5,183.52 4,860.00 77.90 101.70 -20.97 FAIL-Major Risk. 18-26-18-26P81-18-26P81 5.163.52 4050.00 77.90 101.69 -20.91 FAIL-Major Risk 18.27-18-27-18.27 4,211.88 3,975.00 381.44 51.50 330.19 Pass-Major Risk 18.27-18-27A-18-27A 4210.12 3$75.00 381.41 51.47 330.20 Pass-Major Risk 18-27-18-27B-18.278 4.210.12 3,97580 381.41 51.48 330.20 Pass-Major Risk 18-27-18-27C-18-27C 4,211.56 3875.00 375.38 53.12 322.40 Pass-Major Risk 18-27-18-270-18-27D 4.210.12 3,975.00 381.41 51.48 330.19 Pass-Major Risk 18-27-18-27DPB1-18-27OPB1 4.210.12 3.,975..00 381.41 51.48 330.18 Pass-Major Risk 18-27-18-27E-18-27E 4,210.12 3.97580 381.41 51.49 330.18 Pass-Major Risk 18-27-18-27EP81-18-27EPB1 4210.12 3,975.00 381.41 51.49 330.18 Pass-Major Risk 18-27-18-27EP82-18-27EPB2 4,210.12 3.97580 381.41 51.49 330.18 Pass-Major Risk 18-27-Plan 18-27E DO NOT USE-Plan 18-27E 4,209.87 3,975.00 381.41 51.47 330.20 Pass-Major Risk 18-28-18-28-18-28 3,092.71 3,175.00 277.33 53.59 224.30 Pass-Ma1or Risk 18-28-18-28PB1-18-28PB1 3.092.71 3,175.00 277.33 53.62 224.27 Pass-Major Risk 18-29-18-29-18-29 2,909.12 2,960.00 541.57 35.33 506.51 Pass-Major Risk 18-29-18-29A-18-29A 2,999.12 2960.00 541.57 35.33 506.51 Pass-Major Risk 18-29-18-298-18-298 2,999.02 2960.00 541.57 35.60 506.24 Pass-Major Risk 18-29-18-29BP81-18-2913PB 1 2,999.02 2,960.00 541.57 35.33 506.51 Pass-Major Risk 18-29-18-29C-18-29C 2,981.49 2,925.00 541.31 35.17 506.38 Pass-Major Risk 18-31-18-31-18-31 3,139.88 3,15080 283.51 44.70 243.81 Pass-Major Piet. 1831-18-31A-1831A 3,139.88 3,15080 283.51 44.81 243.8C Pass-Major Fisk 18-31-1831PB1-18-31 PB1 3.139.88 3,150.00 283.51 44.81 243.80 Pass-Major Risk 18-32-18-32-1832 3,175.32 3,275.00 445.93 49.57 398.81 Pass-Major Risk 18-32-18-32A-18-32A 3,175.32 3275.00 445.93 49.59 396.78 Pass-Major Risk 18-32-18-32A-Plan*103 3,175.32 3275.00 445.93 49.74 396.84 Pass-Major Risk 18-32-18-328-18-32B 3.175.32 3,27580 446.93 49.70 396.70 Pass-Major Risk 18-33-18-33-18-33 2,658.21 2800.00 275.69 61.62 221.56 Pass-Major Risk 18-33-18-33A-18-33A 2.85821 2,803.00 275.69 61.82 221.44 Pass-Major Risk 18-33-18-33AP81-1833APB1 2.658.21 2807.00 275.09 61.83 221.43 Pass-Major Risk 18-34-18-34-18-34 2,865.51 2,803.00 419.78 61.65 363.47 Pass-Major Risk 14+82013 4:09:47PM Page 5 cf 6 COMPASS 5080.1&Rid 61 BP by Anticollision Report BAKERHUGHES Company: North America-ALASKA-EP Local Co-ordinate Reference: Well 18-11-Slot 11 Project Prudhoe Bay TVD Reference: 18-118 tib 84.50usft(Parker 272(ARH=47.10)) Reference Site: PB DS 18 MD Reference: 18-118 @ 54.50usft(Parker 272(ARH=47.10)) Site Error: 0.00usft North Reference: True Reference Well: 18-11 Survey Calculation Method: Minimum Curvature Well Error 0.O0usft Output errors are at 1.00 sigma Reference Wellbore 18-11 B Database: EDM R5K-Alaska PROD-ANCP 1 Reference Design: 18-118 WP10 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) Iusft) (usft) Lis DS 01 L1-01-L1-01-L1-01 14,30523 '1,250.30 442.46 278.72 178.70 Pass-Major Risk L1-01-Plan#119L1-01A-Plan#119 14,3305.93 '1.253.00 442.46 278.93 178.40 Pass-Major Risk LI-09-L1-09-L1-09 18,070.95 12,850.00 1,288.52 285.25 850.31 Pass-Major Risk Lis DS02 L2-25-L2-25-L2-25 Out of range 'GI 1464-01-1,461-01-NGI-01 Cut of range NG4-03-NC4-03-NGI-03 17.450.53 0.550130 553.69 504.70 51.75 Pass•Major Risk. 080518 18-05-18- -18.05 Cit of range 18-05-18-05A-18-05A Cut of range 18-05-18-05A-18-05A wpO7 Out of range 18-07-18-07-18-07 Out of range 1847-18-07A-18-07A Out of range 18-07-18-07AP81-18-07P B1 Out of range 18-07-18-07AP82-18-07APB2 Cut of rang* 18-09-18-09-18-09 Cut of range 18-09-18-09A-18-09A Out of range 18.09-18-09B-18-098 Out of range 18.09-Plan 18-08C-Plan 2 Out of range 18-09-Pian 18-O0CPB 1-Plan 2 Out of range 18-10-18-10-18-10 Cut of range 18-10-18-10A-18-10A 17.873.14 13,780.00 2.088.34 1,160.88 915.32 Pass-Major Risk 18-10-18-1OAPB1-18-10APB' Cut of range 18-10-1 B-10AP82-18-10APB2 Out of range 18-10-18.138-18-108 17.015.34 14,107.00 1,798.83 1,144.31 850.85 Pass-Major Risk 18-1D-18-13C-18-10C Out of range 18-10-1 B-13CPB1-18-1OCPB' Out of range 18-11- '8-'18 Pilot-18-'1 B_PB 1 WP03 13,874.99 13..875.30 0.28 0.91 -0.50 FAIL-Major Risk 18-12-1 B-12C Contingency-18.120 Contingency Out of range 18.27-18-27A-18-27A Out of range 18-27-18-278-18-278 Out of range 18-27-Plan 18-27E DO NOT USE-Plan 18-27E Cut of range WGI WG1-05-WG1-05-WG1-05 17.055.02 8.703.50 1.843.23 165.10 1,678.13 Pass-Major Risk 102812013 4:01:52PM Page 3 cf 4 COMPASS 5000.1&tifd 61 .. N V loll O C N o, LOo, LO p OD 8 VI 8 8 ,_ 1 cn O' O;000000 GP F n ,I 08 U)cd U)O U)U)O6 U R Z b J J 6 J J 83 J J J Zg C. 10 4 o Z «t000 ORor,000ODOc,— g < §ap R m m mii1iii1irAo CD Q U) <I-YU)U)U)U)U)V)toV)toto<nI- r) c,CD CD CD C.U)tn o U)O)w-OD CD O7 0 0.ii Li = �?Q pwp p�U>N OM 07 Twp CO 41 00 ER 0,. S S G �j p� �pO�pNp N�"^OpD�tpplN�Nt1�:N QG 61 8 t - L Or N N N t O N M OU)t DU)—. O. -�� p yy taX�e d, R ` C p Y p_rz o �(V(V, p;�, "CP t N C� ,:inn--4-.-.A2 abi-77,1•::1 3 _ �m N -w.-. 8 VI o a F+ .t. ,n !NO �i .4,8 s � iFca's i t > -a tis'as 115 12'�� g W .'.-603 m m mmm + c_aela , b;N C 8 w CU s ,03 Rim-AR, 0 0 8 0 8 O. 8.. b 8... 0... ....g.... o b - co ON U E.7 mZ o 0 CA 0 m e e V-, n a o, N m °° W r'n°b cb°y $o (ui/;jsn oc8) (+)u oN/(-)ulnos W Q < o g a ER s s n 53 �; °� d 0. aryNN M ad- < o`f Eono4�,888 wo ,o v�9; t RAE;?.iA m N Ta�NNh N" 00.-E"1oFF,.-coN KN 2 amu a O$ g 5a `� - } N $ 1 Q� 12 mime ghOhOi:O88i',W VNVhO2,17,Mo88N«A SOnM Q{yy i.4'/ I'''f .xP1'%8 Ugg�281"*R"283gN{3g�Trarf58gg"p"2;2CN F, / t• U0, , gqm RM fn MO U^]I�Nc2rn N Qp M A M M MM OV VR cu Y/{ > O, 8S i55jp`T�aQ opn NQOQpp HHSSpp ,oAm N �_ _ ___ G, p NO elO to p2�1111(fq NYf NN1i,�1ANNN,�,�,�,�,�,�( u� - 0. a -_. ^ O Q6 F c_ONcM�pO.g03228Og1=- NNmNN V2 `meg fl o A ;, u, 4z ' , •I o ob a _000ti8 0 0 Tf 8� 000— . = 00 'a te p, 00 �'O M con, H sb 8 of A 7. J )oW XE �N mA22i "'co m CI OOoo0o�Co - Co >m - uRpROaco Mzmpab— "8288o8go8o88 A04) M as.--8 ooc vocv)co' ^ M O,Yp w mI y2 /0,` Ir. d .i;Jy oC.,c.i CM O N<6 v6 O 1.:G0 V ml %:,, qV1 cb ¢ d t' t)c4'4r'4 r.4gt t��itW.:§ O p oo, N V QJ ZZ�Z 1 7 N M e?M t'�J q 1- v .4 U(/` O y', 12 a J =PS F or,,zzzAl2%4A°ra � 1p —N o/joS rn> J n X�1L1 - ' U Zq[V qMN O coi tT th to cg .( `rnW + ole UJ U) N " ..__... O cpm, w �8 �... ;, 00, i 1 a m L. v o NoiNN,= r�,m==m o `all ,� F, t 21 v 4 ''c> oco4i M r'r�� gv v v \0so Z,pog M M 2Uh M 83 M N N M CoOm, p, MMM+)<) 7M ,\* m `-y PO .... C C cV 0 0 t05 o Ute)r i m.... a. 8 V RI 4.0 �o �otroi Lel voi ton ton�i ton LJ- u`�i�Muoi y cn cn .'� ' 5 V U V IF E. w �cUt�nppG�Ui u'i toOri U)cV O OOO a0 tai pQpQ 1104) N A N N N Glp il E'M M M Y O �„ 8 N �.V O O (uiIusn oc9) g1da j isai an anrZ t N 0 0 N M M o imi....1111114 O pKr \ _ - ap 7i" m Lo _l(D S N Nsnr'J l EN i It, ` $ om0000000Ov �� $ p, rp F og8VALLBSs I ' ON8.5aGOC6VV,G qF Ch kh ____._ U Y z O,MM000000N.- _ ,8 a aprEr6 r8 "%i° yogf,... <1 Y V)U)0)N V)�0))m�U))N m mI at . IF� N N N UN')N A M M p<2 770 FA 23 R4 M ,r � a 6-22 22'6 Q Q F N`� Y>tgD�2 2b vg I 8a. 8Nm� � `'-ff,, „^ _ .,g_mm d I 8i . REal a„`�'S n Y $2',25 m m m ff /1,r' e, ¢¢p 8 w ab �b;I. zoo8 F 9 00 > N „ 8 E0mmUmmt Tr 8 mlmimmlmml -' � lR-Wt0-116W PIJ 8 0 8 c 8 53 8 O 8 F o to7tEgg013 g 3S�EX E§� IC N `14 o 8 o N 8NN MSi M (u?/gsn Oct)(+)uuoN/(-)glno o m mab Kinn-gps Z o o 2 0 T 0 . NarM nRys � H y_pJ001 ,� m F p—o0UF C 8 I om a LL m a �° llila1l Ix- S N F. d 4 sC 2oohv01Q0<�hOba^O�4N V�c'�rc^O��pO _- - W 43�! N gj o 222g"A68•6Co ci ri p h O °81 Q2S 2i Si2ivoi2i�vOi 2222 1 I -- -- h I 1-q4300 �ixsoo 8 I2 V F- 0 r rn b' I SY100 gg ti ggvi ` O 8 S ,o r 17500 m M m3 0 ali €A 1- y I 700 7. JN MR8V 4Wss � �pgvNC < Ly � O � m2prro68 S CO 90M" .500 a°°3j �SpNFSpSpSNOS _ _- __ r_a 0008o8m000 oZ � c. i00891 gi '4+ on $l r �S$�rnS$8$$gg d Qpm>amomam 0oco� o�c<iovco F2Ua � F. 0 on y o T %�'cA0E13."6 2S3.1o$c 1 r - 1,3500 2 ,"5 I tii O 3 Z p J p 0 O g' .0 U i ^--�Ei NNNv� g N. _ __ 6; y D �� w co aom .ODOD.romm 00>bI fi ,� ��cvpp.2 EA S�i�cr.,53u�i N -- f- .Y/ ' JAAAAAggl i P. (,_ , ' E'I _'% F ER 8 aZ1 r� 0 0�.� - N e4 FA ptp NN N N N 0.. ���ssssgsm� N -, 22,7oot88882..m .. i .. . .... ..A. . mf ❑ .. g m o 0 ' N RaSNNm O O O O . . .92 Ch$ 9j 4 . 2 dg Ch E453mmSI o y ..O, 8 O ' OO OO O i �c g p 2 r Cor0 o 8, (ui/gsn OSE)q;daQ Iuot-an anal Ferguson, Victoria L (DOA) From: Mammadov, Famil <famil.mammadov@bp.com> Sent: Tuesday,January 14, 2014 4:41 AM To: Ferguson, Victoria L (DOA) Subject: RE: PBU 18-11B(PTD 213-195) PBU 18 -11A (PTD 209-074, Sundry 313-637) Attachments: 18-11B PPFG.xls Follow Up Flag: Follow up Flag Status: Flagged Victoria, I apologize for late reply, I've been out of office. The reasoning behind not applying gas pressure to surface is because it is too conservative in the case of this well. In an unlikely case of taking a gas kick the surface pressure will continue to rise (if no action is taken) to the point when the weakest formation will fracture, i.e. we will never see gas pressure to surface in any case. Most likely value of fracture gradient of the sand formation below the casing shoe is — 12.48 ppg. The calculation method that I used considered the highest predicted Shale fracture gradient- Brumfield model at the shoe + 2ppg safety factor which in turn resulted in pressure gradient of 16.88 ppg (this is higher than Overburden gradient). Substracting gas gradient(0.1 psi/ft) from the highest possible fracture pressure at shoe would result —2061 psi at surface. In other words, the MPSP will not exceed this number in any scenario with the given fracture gradient values. If I consider simply extrapolating gas gradient to surface it would require excessively high casing testing pressure, i.e. normally our test pressure = 1.2 x MPSP. This would potentially compromise the design of this well as the required pressures would exceed 4,000 psi. Considering that a section of 9-5/8" casing will be cut&pulled we don't want to apply such a high pressure to the 13-3/8" string which had not been tested to that value in the past. Please let me know if you need any further clarification on this issue. Regards Famil From: Ferguson, Victoria L (DOA) [ ''Ito:victoria.ferguson@alaska.goy] Sent: Tuesday, December 24, 2013 1:00 AM To: Mammadov, Famil Subject: RE: PBU 18-11B(PTD 213-195) PBU 18 -11A (PTD 209-074, Sundry 313-637) Famil, Please clarify further why if there is 10.2 ppg EMW pore pressure in the intermediate section and a gas column to surface, why the MPSP isn't the pressure at the intermediate section less the gas gradient to surface. What is the frac gradient at the intermediate section? I have not seen this method of calculating MPSP on a PTD before. Thanx, Victoria From: Mammadov, Famil [mailto:famil.mammadov@bp.com] Sent: Wednesday, December 18,2013 10:24 PM To: Ferguson, Victoria L(DOA) 1 Cc: Joseph Lastufka Subject: Re:PBU 18-11B(PTD 213-195)PBU 18-11A(PTD 209-074,Sundry 313-637) Victoria, The estimate of MPSP for the intermediate section assumes that at some point the formation will break down under pressure if we get gas gradient to surface. I used the maximum possible fracture gradient to calculate the breaking pressure and extrapolated the gas gradient to surface from that point. Please let me know if you need further clarification Regards, Famil On Dec 18, 2013,at 11:32 PM, "Ferguson,Victoria L(DOA)"<victoria.ferguson@alaska.gov>wrote: Famil, The max formation pressure for the intermediate section is 4422 psi @ 8039'TVD. Why isn't the MPSP 3618 psi? What is the MPSP for the plug for redrill operations on PBU 18-11A? Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage.AK 99501 Work (907)793-1247 victoria fcrguson4-dalaska.gov 2 Ferguson, Victoria L (DOA) From: Mammadov, Famil <famil.mammadov@bp.com> Sent: Wednesday, December 18,2013 10:24 PM To: Ferguson,Victoria L(DOA) Cc: Joseph Lastufka Subject: Re: PBU 18-11B(PTD 213-195) PBU 18 -11A(PTD 209-074, Sundry 313-637) Follow Up Flag: Follow up Flag Status: Completed Victoria, The estimate of MPSP for the intermediate section assumes that at some point the formation will break down under pressure if we get gas gradient to surface. I used the maximum possible fracture gradient to calculate the breaking pressure and extrapolated the gas gradient to surface from that point. Please let me know if you need further clarification Regards, Famil On Dec 18, 2013,at 11:32 PM, "Ferguson,Victoria L(DOA)"<victoria.ferguson@alaska.gov>wrote: Famil, The max formation pressure for the intermediate section is 4422 psi @ 8039'TVD. Why isn't the MPSP 3618 psi? What is the MPSP for the plug for redrill operations on PBU 18-11A? Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W 7th Ave,Ste 100 Anchorage,AK 99501 Work. (907)793-1247 victoria.ferquson(a�alaska.clov 1 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. l'RANSIV/ T TTL LE ER C ECKLST WELL NAME: ela /.;" /1 FT13: 7-1 3 ( ?S /De\elopment Ser\ice i.xploratory _ Stratigrapluc lest Non-Com(All conal FIELD: Wz,c(kikle.2-e.— POOL: 'fi t l�C CI-V. Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be repotted as a function of the original in API number are API number staled above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the7#of hole must be clearly differentiated in both well Pilot Hole name ( ��(- % --//gL PH) and API number (50-Z ./- Z( / ; I -76 - from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo m also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion,suspension or abandonment of this well. Revised 5/2013 C.H Ts co aa. 2co 0 0 0 5 0 co H o w Q03 T 0 n -E- 03 o ami o m o _ cE. 'o co g � o o O a ca a _ - o v c 0 3 w u) o m 2 c 0 CO , E as J 6i E O 0 a X fO N a) N J J o .° co. f6, -8. 2 < O c •5i-q E N o. 0) w 0 N as o c ° o a U - w m ca m m o co w 3 o a a) (0 3 @ 0 a co - 3, Oo 2, 15 v j m 2 o O Q. 3 CO 3 O p L a> E co' N �� w S ob 13 o m ". N L a) J W OO S: co F O N 0 C v 3 >O Q o L0 O. �. Z d ° 0 0 D O O co co p, ° c w c o a co ° D 0. C o U a) N al N 0 N L 00 D. '- E a O Jv > a S. �: m M CO N M 0as 0 U N N. No m O co O CV cco c) N N N M co j' CO in-' 4 N I J c co m w •p 3' Co C co 0 a °. CI Q zH 2 o ca 0 .3 m zo 0_ 3 co m': CL 00. E T U L d N N di Y c v0 N •- O' ''.'n' co aco c I- N - •3 c co co Z c (n a v a `, >' a N O N co o N a> a> .a) .9 N. 0). �' CO CO V Q 0 C 3 0 N C C C erg a) �, d. L. 7. ai o a co z @ CO o CD on' o a o ° co E E N 0. O N C O U U' >. N' 2; .N ,) c0' G> v o. 3 ca.) co O 0 OJ D. a y 0 U. 0 @ N U o a E CO p cO O Z M c CO v CO CO 0CC -° L. 0 'i xa> NIIr °- Z 8 O a N 0 �O Ca (/) O g gw 0) .g. I- U o 0 (nn a a < I pa a w 0 \` Q Q a a a a a aa> co aa. a aa. a s < < < < < < < a a a, a> a)a, Q, Cl) Cl), Cl), a, a a) Q, o:, a, 0, Q. Q. ' •. azz >- >- >- rr } >- } ) } r } zzz zzzz } } } > > z >- > - >- >- z, z >- z, zz Yj T V` F o m _ \ U o c To' a) a� F, E 3 - E a> U E.0 C N a) C O o 0 Nt w 13a n T 0 � c L o U) a ° c >_. 0 o O O M C cpi' O U c Ow c6 0. N. a N. O` o. EOE p. N� °- S J_ ° o v t ° c c O Q L •pp. n• .0 N, 0 U. �. LI •y ��° o w 't a >O = N C > -Ip N, -O. N. o. 7. O. a) C o o ° @ 3 L -0, 0- > 7.. O 'C a a �' °.. a'' 4, 7, N m Z lc; 'C 'C o> i Z' N a> 7. 5?, a). (. C. C) co co C, N, 7. O �, 3 y N a N' \. CO •a 0 C. •O. O' N.. 'C -p O7 N Q D. O. C o. CO 0. O 0) 0 a L co C C a> C o 020' O Q co E E = ° c c E ns �> o c c in F c o 0 a c o C c a N L 0 U co co Q o o a_ Zi •° o a 2 u> 0 0 0 o of 0 V '0 0 ° ° o. ui a o -0 o, >, (a e' m ° D Q Q E a o a> c 5 , o = = ° -0 0 m C0 o o' 0 0. as. co E .m '@ Q % -0 N >: o. rn p. o. c• 0 J w a> c c@ r r v. ° c o w aZi, w N. = cm 4 3' n o ° L' N' 0 3, m E a Q E N c v co co co a a. p v 03. N -O a> 0 i -- a)C co co. @ (o U o. O` a. O 3 ° -c N a) O W o z o o N m 3 3 0 o a> .. a c> -, 3 m m O a o N 4 0 3, -Q v C l0 v, > _ -� U O 7 �' o O a is 3 N O L' Z w- U a° O o v a 0 a ° ° 03 0 a) ami o as o �> o o Y 0 o o v>' ° E ao>' as' E' .c °> o aa) ° .- N, c, o(S U o a a> v a O o o a D W a C V o a ° .a) - v 0 `_ N CO E'. co o. • N o c °', O v ce N U o E 0 O O o> N 0 a cn v> co • O> O N as N 10 c0' O oI T . 3 = a cn p' y O. _a a3 m L 7 7 ,- ° a O v' _ c v' -N: E O m N Q C v v v U N >' u1 -O t N in C N N > rn c co y, Q G L-. cn .,°� U O OU 43 Y. >. .p a> X aci a) E a> o a; g> o -a o L C C E -.1') 3 g o (`a> 0 m c0i 0 0 0 ` 5 v0 a CO ° c 0 m; N; m' 0 c . Ci- 1 w > 0 c' 3 0 0 0 m •o `o U U `m p m o i> o - - = -0 - 'a -. . > c vi a E •3 w E o 0 0; V, _ o o 0 o o a U > > rncm J Co c E m m m e- 0 0 0 E E c m 3 , C .2 1- I- i- ) 0 w w 3 c a; a: o Y`o a 0 E a .ccoo; �' c m >, O `m o c -.'71) o v a a o o a> 0 0 g g g a> v 0 v `a 'c O, O, -C o a> 0 m, 0 0 p QZ U @Za -IDS 5 nwooaa05Qa U (a000UQwQw000COC..) 5 N2; ia0 (n, (nU W a O N M V L° o Oo O co N M .7 10 CO h CO a) O e- N M '0' LO CO 00 a> . = E r• s- (N co 7 o (0 0) N N N N (N (N (N (N (N N CO CO CO CO CO Co CO M CO CO i., 0 CO 1 COI- 0 G O C - N "' O .' N E c3 0 ce L.0 0 di - 0 O> 0 0 (0 rn a1 0 y'J a R N E T 0 0�.5: J N c c o W 0IEH -0 a .� a _J 0 aL 0 5. o_ Q Q w Q U Q u)