Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout192-148STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Other ~ TUBING Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ PATCH Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ^ 9282'-9302' 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: Permit to Drill Number: Name: Development Q Exploratory ^ 192-1480 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ API Number: Anchorage, AK 99519-6612 50-029-22324-00-00 8. Property Designation (Lease Number) : 9. Well Name and Numbe~ ADLO-028257 PB 10. Field/Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: MAR ~ 8 Z~~U Total Depth measured 10020 feet Plugs (measured) 9a Olj ~~~ COf18 )S~~ ~~ true vertical 9241.46 feet Junk (measured) None fe~~~ Effective Depth measured 9940 feet Packer (measured) 9317 9379 true vertical 9167 feet (true vertical) 8588 8645 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 91.5# H-40 33 - 113 33 - 113 1490 470 Surface 126 13-3/8" 68# K-55 32 - 158 32 - 158 3450 1950 Surface 2860 13-3/8" 68# L-80 158 - 3018 158 - 2944 4930 2270 Production 9502 9-5/8" 47# L-80 31 - 9533 31 - 8788 6870 4760 Liner 659 7"26# L-80 9361 - 10020 8628 - 9241 7240 5410 Liner Perforation depth: Measured depth: SEE ATTACHED - _ _ - - True Vertical depth: _ _ _ = - Tubing: (size, grade, measured and true vertical depth) 5-112" 17# LL-80 29 - 9377 29 - 8643 Packers and SSSV (type, measured and true vertical depth) 5-1 /2" TIW HBBP Packer 9317 8588 7" Baker H-Isolation Packer 9379 8645 12. Stimulation or cement squeeze summary: ~g~`~~~ >> ryry J /~E'G~~ 1~ ~ ~ ~ i,K L U E t' Intervals treated (measured): ~., ,~ Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SI Subsequent to operation: 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development Q Service ^ Daily Report of Well Operations X .Well Status after work: .Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date 3/8/2010 .,~ ~ ~ ~ ~ ,.-t„t ~ . , , ~.,,,., . ~vun~.~ ~r+n v ~ Lti RJ ~'L ,~ ` /d • /0 ,~ ~,/` ~ ~,~;~~ S-35 192-148 nror n~rrnrulleCA1T • Sw Name S-35 Operation Date 2/9/93 Perf Operation Code PER Meas Depth Top 9,680. Meas Depth Base 9,778. Tvd Depth Top 8,924.23 Tvd Depth Base 9,015.49 S-35 4/8/93 RPF 9,680. 9,710. 8,924.23 8,952.16 S-35 6/30/93 APF 9,546. 9,586. 8,799.68 8,836.84 S-35 3/6108 BPS 9,348. 9,778. 8,616.38 9,015.49 S-35 3/22108 BPP 9,348. 9,778. 8,616.38 9,015.49 S-35 12/24/09 BPS 9,320. 9,778. 8,590.68 9,015.49 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • S-35 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 12/22/2009 ***WELL S/I, ON ARRIVAL***(pre patch) i RU SWCP #9 TO PULL 5-1/2" XX-PLUG. RAN 4.50" CENT/5 1/2" DOGLESS GS W/X- EQ.PRONG 'TO 5-1/2" XX-PLUG @ 9320' SLM/9348' MD, JAR DOWN 3: SAW A TBG PRESSURE CHANGE, CURRENTLY POOH ""CONTINUED ON 12-23-09*"" 12/23/2009' T/I/0= 170/160/0. Temp= SI. T & IA FL for slickline. AL shut-in @ casing valve, ALP= 50 psi. T & IA FL @ surface. 12/23/2009'*'"`CONTINUED FROM 12-22-09 WSR"*" 'PULL 5-1/2" XX-PLUG BODY FROM 9320' SLM +28' = 9348' MD 'DRIFT W/ 4.50" x 8' DMY PATCH, 3.00" S.BLR TAG XN-NIP. @ 9337 SLM/9365' MD. RAN PETReDAT DUAL GAUGES AS PER PROGRAM (see data tab) SET 5-1/2" x 2.75" NIPPLE REDUCER @ 9320' SLM/9348' MD ON THIRD ATTEMPT, RIH W/ 3 1/2" X-LINE/2.75" XX `*'CONTINUED ON 12-24-09 WSR"** ..Test # 1 Failed /Test # 2 (CMIT TX IA to 2500 Psi Passed) TBG and IA j ,Lost 20 PSI in 1st 15 Min. and 0 Psi in 2nd 15 Min. for a total loss of 20 Psi E on TBG and IA in 30 Min. Bleed back TBG and IA to 200 Psi. RDMO. S-Line on well @ departure. IA and OA open to gauges. Operator notified. FWHP= ' 200/200/0 2/7/2010 "** WELL SI ON ARRIVAL"*" (ELINE PATCH) INITIAL T/I/O = 200/160/0. "`SET WEATHERFORD 5.5 IN CHROME 20FT PATCH IN TUBING OVER GLM 1 FROM 9282 - 9302 FT. CORRELATED TO ATLAS JEWELRY LOG 11 MAR 1993. PATCH SET SUCCESSFULLY, DID NOT TAG PATCH ..AFTER SETTING. ?..FINAL T/I/O = 300/400/0 "'"JOB COMPLETE""* 12-24-09 __ _ _ _ _ _ ___ _ 12124/2009' "*CONTINUED FROM 12-23-09 WSR"""(pre patch) !...SET 2.75" XX-PLUG IN NIPPLE REDUCER @ 9320' SLM/9348' MD LRS PERFORMS SUCCESSFUL CMIT TxIA TO 2500#(see Irs reports) **"WELL LEFT S/I, PAD OP NOTIFIED"** 12/23/2009''+CMIT Tx IA /Arrive on location /standby for S-Line / Awgers continued on 12/24/2009 T/I/0= 300/300/0 (Assist S-Line /CMIT Tx IA) Standby for S-Line /Pump 16' bbls dead crude down TBG to press.up Tx IA to 2500 Psi. (CMIT Tx IA) • 2/8/2010;T/I/O= SSV/350/0. Temp= SI. IA FL (post patch). AL shut-in ~ casing valve,. ALP= 0+. IA FL @ surface. iSV,WV,SSV,ALC=closed. MV=open. IA,OA=open to gauge. NOVP. 2/14/2010~T/I/O= SSV/350/0 Temp= SI MIT IA PASSED to 2700 psi (TxIA comm) Pumped 5.8 bbls 30" diesel down IA to reach test pressure, IA lost 0 psi in 1st 15 min and 0 psi in 2nd 15 min for a total loss of 0 psi in 30 min test, Bleed IA pressure, Bled back ~ 6 bbls, Final WHP's 40/240/0 "Valve position ~ departure- Swab, Wing, SSV= SI /Master, IA & OA=Open" FLUIDS PUMPED BBLS 1 Meth 7 DIESEL 8 Total TREE _ ~ 7" 5M CM! WELLHEAD=13-5/8" 5M GMV ACTUATOR= BAKER KB. ELEV = 67.74' BF. ELEV = 35.74' KOP = 1772' Max Angle = 28 @ 3517' Datum MD = 9619' Datum TV D = 8$00' SS ~ 13-3/8" CSG, 68#, K-551E-80, ID = 12.415" ~ SAFETY S: ~ S-35 100x, I-j EST TOP OF CEMENT (10/16!04) I 2102' 5-112" OTIS HQR SSSV LAND NIP, ID = 4.562" ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 2996 2924 26 MMG DMY RK 0 03106(08 3 5665 5307 28 MMG DMY RK 0 03/06/08 2 7868 7289 26 MMG DMY RK 0 03/06/08 1 9281 8555 .24 MMG **DMY RK 0 04/25108 PRTt-~ ~ Minimum ID = 2.75" @ 9348' 5-1 i2" X 3-112" REDUCING NIPPLE 'TOP OF 7" LNR 5-112" TBG, 17#, L-80 NSCC, .0232 bpf, ID = 4.892" 9-518" GSG, 47#, L-80, ID = 8.681" PERFORATION SUMMARY REF LOG: BHCS ON 01120/93 ANGLE AT TOP PERF: 22 @ 9546' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 9546 - 9586 C 06/30/93 3-318" 10 9680 - 9778 C 02/09/93 PBTD 7" LNR, 26#, L-80, .0382 bpf, ID = 6.276" DATE REV BY COMMEMS DATE REV BY COMMENTS 01124!93 ORIGINAL COMPLETION 02/09108 TTR/ PJC SFTY NOTE & LOC CORRECT 03/06/08 KJBiTLH GLV GO 04/06!08 KDGSV SET XX PLUG (03122/08) 05/17/08 DAV/TLH GLV GO (04/25/08) 01!04(10 BSE/PJC SET RED NIP! XX PLUG (12/24/09) PRUDHOE BAY UNff WELL: S-35 PERMff No: 1921480 API No: 50-029-22324-00 SEC 35, T12N, T12E, 1645' FNL & 1818' FWL BP F~cploration (Alaska) Y FIAS CXI FJVUFJ? YA(:KIIVt3 y/FTl~(f~'p Oc'$~V 8299' 5-1/2" PARKER SWS NIP, ID = 4.562" 9315' TNV ANCHOR LATCH, ID = 4.766" 9317' 9-518" X 5-112" TM/ HBBP PKR, ID = 4.750" 9348' 5-1/2" PARKER SWS NIP, ID = 4.562" 9348' 5-1/2" X 3-1/2" NIP REDCR, ID = 2.75" {12/23/09} 2.75" XX PLUG (12/24/09),... 9~0 > g365'~ 5-112" OTIS XN NIP, ID = 4.455" 9377' -~5-1/2" W/LEG, ID = 4.875" 9386' ELMD TT LOGGED 03/11 /93 ~ ~-~ FISH: 1-112" GLV ON RK LATCH (09/14/06) ~ • bp BP Exploration (Alaska) Inc. ~ `` ~ ~. F, Attn: Well Integrity Coordinator, PRB-20 "'x Post Office Box 196612 Anchorage, Alaska 99519-6612 June 25, 2009 i Enclosed please find a spreadsheet with a list of wells from S-Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, 4 1 (~:. j ~`~itMP i,,~ ~,~`~e~`'~~'~.r' .~ li ~.. ~ ' ' Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska ) Inc. Surface Casing by Conducto~ Annulus Cement, Corrosion inhibitor, Sealant Top-off Report ot Sundry Operations (10-404) S-pad Date 6/25/2009 Well Name PTD M Initial top of cement Vol. of cement um ed Final [op of cement Cement top off date Cortosion inhibitor Corcosion inhibitor/ sealant date ft bbis ft na al S-018 1952020 025 NA 025 NA 2.6 5/30/2009 S-02A 1941090 025 NA 025 NA 1.7 5/25/2009 5-03 7811900 1325 NA 1325 NA 92.65 5/20/2009 S-04 1830790 0 NA 0 NA 0.9 5/25/2009 S-OSA 1951890 0 NA 0 NA 0.9 5/26/2009 S-O6 1821650 0 NA 0 NA 0.9 5/26/2009 S-07A 1920980 0 NA 0 NA 0.9 5/26/2009 S-OBB 2010520 0 NA 0 NA 0.85 5/27/2009 S-09 1821040 1.5 NA 1.5 NA 9.4 5/37/2009 S-10A 1911230 0.5 NA 0.5 NA 3.4 5/31/2009 S-118 1990530 0.25 NA 025 NA 1.7 5/27/2009 S-12A 1851930 0.25 NA 0.25 NA 1.7 6/1/2009 S-~3 1821350 8 NA 8 NA 55.3 6Ii/2009 S-15 1840170 0.25 NA 025 NA 3 6/2/2009 S-17C 2020070 0.25 NA 025 NA 2.6 6/1/2009 S-18A 2021630 0.5 NA 0.5 NA 3 6/2/2009 5-19 1861160 0.75 NA 0.75 NA 22 5/19/2009 S-20A 2010450 0.25 NA 0.25 NA 1.3 5/19/2009 S-2t 1900470 0.5 NA 0.5 NA 3.4 5/25/2009 S-228 1970510 0.75 NA ~ 0.75 NA 3 5/79/2009 5-23 1901270 025 NA 025 NA 1.7 5/25/2009 S-248 2031630 0.5 NA 0.5 NA 2.6 5/25/2009 S-25A 1982140 0.5 NA 0.5 NA 2.6 5/25/2009 5-26 1900580 0.75 NA 0.75 NA 3.4 5/26/2009 S-278 2031680 0.5 NA 0.5 NA 2.6 5/31/2009 S-28B 2030020 0.5 NA 0.5 NA 2.6 5/31/2009 S-29AL7 1960120 0 NA 0 NA 0.85 5/27/2009 S-30 1900660 0.5 NA 0.5 NA 5.1 5/31/2009 S31A 1982200 0.5 NA 0.5 NA 3.4 5/26/2009 S-32 /901490 0.5 NA 0.5 NA 3.4 5/31/2009 S-33 7921020 0.5 NA 0.5 NA 4.3 5/26/2009 S-3a 7921360 0.5 NA 0.5 NA 3.a 5/31l2009 5-35 1927480 0 NA 0 NA .e5in 5/31/2009 S36 1927160 075 NA OJS NA 425 5/27/2009 S37 1920990 1.25 NA 125 NA 11.9 5/27/2009 S38 1921270 0.25 NA 025 NA t02 5/27/2009 S-41 1960240 1.5 NA 1.5 NA 11.1 5/30/2009 5-42 1960540 0 NA 0 NA 0.9 5/30l2009 5-43 1970530 0.5 NA 0.5 NA 1J 5/28/2009 S-44 1970070 025 NA 025 NA 1.7 5/28/2009 S-100 2000780 2 NA 2 NA 21.3 5/29/2009 5-101 2001150 1.25 NA 125 NA 11.9 5/29/2009 S-102L7 2031560 725 NA 125 NA 71.t 5/31/2009 S-103 2001680 1.5 NA 1.5 NA ~t.9 5/18/2009 S-104 2001960 1.75 NA 1.75 NA 15.3 5/20/2009 S-105 2001520 4 NA 4 NA 32.7 5/20/2009 S-tOS 20t0120 1625 NA 1625 NA ~74.3 6/2/2009 S-107 2011130 225 NA 225 NA 28.9 5l18/2009 S-108 2011000 3.5 NA 3.5 NA 40 5/30/2009 5-109 2022450 2 NA 2 NA 21.3 5/30/2009 5-110 2011290 11.75 NA 11.75 NA 98.6 5/30/2009 S-111 2050510 2 NA 2 NA 19.6 5/30/2009 S-~ 12 2021350 0 NA 0 NA 0.5 5/30/2009 5413 2021430 1.75 NA 1J5 NA 22.1 5/18/2009 5-714A 2021980 725 NA 125 NA 102 5/30/2009 S-115 2022300 2.5 NA 2.5 NA 272 5/29/2009 5-116 2031810 1.5 NA 1.5 NA 13.6 5/28/2009 S-1t7 2030120 1.5 NA 1.5 NA 15.3 5/29/2009 S-118 2032000 5 NA 5 NA 76.5 5/28/2009 S-~19 2041620 1 NA t NA 52 5/30/2009 5120 2031980 5.5 NA 5.5 NA 672 5/29/2009 5-121 2060410 4.5 NA 4.5 NA 53.8 5/28!'2009 5-~22 2050810 3 NA 3 NA 2t3 5/29/2009 5-123 2041370 1.5 NA 1.5 NA 20.4 5/26/2009 5-124 2067360 1.75 NA 7.75 NA 11.9 5/26/2009 5-125 2070830 225 NA 225 NA 20.4 5/28/2009 S-126 20710970 125 NA 125 NA 15.3 6/1/2009 S-200 1972390 125 NA 125 NA ta.5 5/28/2009 5-201 2001840 0 NA 0 NA 0.85 6/19/2009 S-273A 2042130 2 NA 2 NA 13.6 5/29/2009 S-215 2021540 2 NA 2 NA 18.7 6/1/2009 5-216 2001970 4.75 NA 4.75 NA 51 5/29/2009 S-217 2070950 025 NA 025 NA 7.7 6/1/2009 5-400 2070740 2 NA 2 NA 9.4 5/28/2009 S-401 2060780 16 NA 16 NA 99.5 6/2/2009 5-504 0 NA 0 NA 0.85 5/28/2009 ~J= PROACTIVE DIAGNOSTIC SERVICES INC. ~~~~ ~r ~~i'if V~~1~{~~I~#L To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hale/Mechanical Logs and /or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2 - 1 900 Benson Btvd. Anchorage, Alaska 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 t9 2 ' ~~~~ r9 ~c~ 1) Leak Detection - STP 25 Apr-08 S-35 2) Signed Print Name: 1 BL/ EDE 50-029-22324-00 Date : _, . PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (9071245-8951 FAx: (9071245-88952 E-MAIL: -: ~_- _ - ---- -- WEBSITE - _._-_°-. _ .____ ~_ C ~Doeumen5 and SetlingsDiane `NiLI arns\Desk,-top~,Tr~~n t_BP docx 5-35 (PTD #1921480) Internal W~er Cancellation -Not Operable Well Page 1 of 1 Re James B DOA JJ, ( ) From: Lau, John, Jack [IaujjO@BP.com] on behalf of NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] ~~ (~j7(i?~ Sent: Monday, December 31, 2007 9:33 AM To: NSU, ADW Well Operations Supervisor; Rossberg, R Steven; GPB, GC2 Wellpad Lead; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, Wells Opt Eng; GPB, Optimization Engr; Engel, Narry R; GPB, Prod Controllers; Regg, James B (DOA); Maunder, Thomas E (DOA) Cc: Ohms, Danielle H; NSU, ADW Well Integrity Engineer; NSU, ADW WI Tech; Lau, John, Jack; Holt, Ryan P (ASRC); Dahlem, Jason E; Boyles, Gerald J; Culpepper, Jerry K. (Orbis) Subject: S-35 (PTD #1921480) Internal Waiver Cancellation -Not Operable Well All, An internal waiver was issued for TxIA communication on artificially lifted producer S-35 (PTD #1921480) on 03/22/06. The dispensation from the Well Integrity ys em Policy for this well has expired. If not already done, please ensure the well has been shut-in by the end of today and arrangements have been made to freeze protect the well. The well has been reclassified as Not Operable. A secure program will be sent shortly. Please remove all Waivered well signs and the laminated copy of the waiver from the wellhouse. Please call if you have any questions. Thank you, Jack Lau (for Anna Dube) Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 ~r~~ JAS ~ ~ ~00~ 1/17/2008 ') STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon 0 Alter Casing D Change Approved Program D Repair Well 00 PluÇJ PerforationsD Pull Tubing 0 Perforate New Pool D Operation Shutdown 0 Perforate D 67.74 8. Property Designation: ADL-0028257 11. Present Well Condition Summary: Stratigraphic D 9. Well Name and Number: S-35 10. Field/Pool(s): Prudhoe Bay Field 1 Prudhoe Oil Pool ExploratoryD Service D Stimulate 0 OtherD WaiverD Time ExtensionO Re-enter Suspended Well 0 5. Permit to Drill Number: 192-1480 6. API Number 50-029-22324-00-00 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 4. Current Well Class: Development ŒJ Total Depth measured 10020 feet true vertical 9241.5 feet Plugs (measured) Junk (measured) None Effective Depth measured 9940 feet true vertical 9166.7 feet None Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 33 113 33.0 113.0 1490 470 Li ner 659 7" 26# L-80 9361 - 10020 8628.3 - 9241.5 7240 5410 Production 9502 9-5/8" 47# L-80 31 - 9533 31.0 - 8787.6 6870 4760 Surface 126 13-3/8" 68# K-55 32 158 32.0 158.0 3450 1950 Surface 2860 13-3/8" 68# L-80 158 - 3018 158.0 - 2943.5 4930 2270 Perforation depth: Tubing ( size, grade, and measured depth): 5-1/2" 17# L-80 @ 29 9377 Measured depth: 9546 - 9586,9680 - 9710,9710 - 9778 , True vertical depth: 8799.68 - 8836.84,8924.23 - 8952.16,8952.16 - 9015.49 Packers & SSSV (type & measured depth): 5-1/2" TIW HBBP Packer 7" Baker H-Isolation Liner Packer @ 9317 @ 9379 12. Stimulation or cement squeeze summary: Intervals treated (measured): 1000' - 2986' RBDMS BFL NOV 1 2 2004 Treatment descriptions including volumes used and final pressure: 119 Bbls 15.73 Arctic 1 Cement wI 1/4 # Cello Flake @ 202 psig Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 0.3 1026 1175 0.3 1172 200 13 Prior to well operation: Subsequent to operation: Oil-Bbl 158 155 Tubing Pressure 221 229 14. Attachments: Copies of Logs and Surveys run - Daily Report of Well Operations. ! 15. Well Class after proposed work: Exploratory 0 16. Well Status after proposed work: OilŒ] GasD DevelopmentŒ] Service D Signature Garry Catron Garry Catron Jj~ C~- WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Title Production Technical Assistant Phone 564-4657 Date 11/9/04 SCANNE.D NO\! 1 5 200{ Form 1 0-404 Revised 4/2004 ) ') S-35 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 10/17104 OA Downsqueeze wI 119 bbls of 15.73 Artic 1 cement with 114 # per sack cello flake. Displaced with 51 bbls crude. 10/20104 TIO=2200/200010 MITOA PASSED @ 2400 PSI (POST OA DWN SQZ)( WELL SHUT IN ON ARRIVAL) INSTALLED INTEGRAL FLANGE. OA PRESSURED UP WI 1.6 BBLS CRUDE PUMPED. 1 ST TEST OA LOST 400 PSI IN 15 MIN. 2ND TEST OA LOST 180 PSI IN 15 MIN. 3RD TEST OA LOST 140 PSI IN 15 MIN. 4TH TEST OA LOST 100 PSI IN 15 MIN. WI TOTAL LOSS OF 130 PSI IN 30 MIN. REMOVED INTEGRAL AND INSTALLED ORIGINAL FLANGE (prD TO 2000 PSI) FINAL WHp1S= 2200/2000/300 BBLS 91 305 119 515 FLUIDS PUMPED Crude Fresh Water 15.73 Arctic 1 Cement wI 114 # per sack cello flake. TOTAL SCANNEr) NO\! 1 5 '2.GO~. Page 1 TREE 'f '" 7" 5M CrN WELLHEAD =13-'5/8" 5M CrN ACWATOR';""" ""SAKER' kB."'aEŸ' ;"""'" , ""M>''''69~Ö7ï BF. ELEV = 35.74' "í<ÖP';'" "" 1iii , MãxÄïïg'le;;.m.'''.~m28''@f3517ï DãiumM6';;""~o,"'o""m" "'o~9619" ÖaiÜrÏÏtV b;;;,uuàaoöiss ) I 13-3/8" CSG, 68#, L-80, ID = 12.415" 1-1 2986' Minimum ID = 4.455" @ 9365' 5-1/2" OTIS XN NIPPLE 8-35 8 SÄ _~1 NOTES: *** T X IA COMM. MAX lAP = 2000 PSI. MAX OAP = 1000 PSI. (03/25/03 W AlVER)*** 1000' 1-1 EST TOP OF CEMENT (10/16/04) 1 2102' 1-15-1/2" OTIS HQR SSSV LAND NIP, ID = 4.562" 1 ST MD 4 2996 3 5665 2 7868 1 9281 GAS LIFT MANDRELS TVD DEV TYÆ VLV LATCH PORT DATE 2924 26 MMG DOME RK 16 5307 28 MMG DOME RK 16 7289 26 MMG DOME RK 16 8555 24 MMG OGL V RK 22 09/16/04 l I I 9229' 1-15-1/2" PARKER SWS NIP, ID = 4.562" 1 9315' I-ITIW ANCHOR LATCH, ID = 4.766" 1 9317' 1-19-5/8" X 5-1/2" TrN HBBP PKR, ID = 4.750" 1 9348' 1-15-1/2" PARKERSWS NIP, ID=4.562" 1 I I 9365' 1-15-1/2" OTIS XN NIP, ID = 4.455" 1 I TOP OF 7" LNR 1-1 9372' r-. I 15-1/2" TBG, 17#, L-80 NSCC, .0232 bpf, ID = 4.892" 1-1 9377' 1 I 9377' 1-15-1/2" W/LEG, ID = 4.875" 1 9386' 1-1 ELMD TT LOGGED 03/11/931 \9-5/8" CSG, 47#, L-80, ID = 8.681" 1-1 9536' ~ ~ ÆRFORA TION SUMMARY REF LOG: BHCS ON 01/20/93 ANGLE AT TOP PERF: 22 @ 9546' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 3-3/8" 4 9546 - 9586 0 06/30/93 3-3/8" 10 9680 - 9778 0 02/09/93 :8: I ~ I I I PBTD 1-1 9940' 1 ~ 17" LNR, 26#, L-80, .0382 bpf, ID = 6.276" 1-1 10020' ~ DATE 01/24/93 09/07/01 03/25/03 09/16/04 10/20/04 COMMENTS ORIGINAL COM PLETION RNlTP CORRECTIONS JLA/KK WAWER SAFETY NOTE KClTLP GL V C/O MJA/TLH OA DWN SQZ DA TE REV BY REV BY COMMENTS SCANNED NO\! 1 5 200Lt PRUDHOE BAY UNIT WB..L: S-35 PERMIT No: 1921480 API No: 50-029-22324-00 SEC 35, T12N, T12E BP Exploration (Alaska) O1'4 OR BEFORE DECEMBER 01 2000 W A't' E K E R C:LOKi~V~ILM-DOC LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 20 February 1995 RE: Transmittal of Data Sent by: ANCH.EXPRESS Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION PLS/STATIC FINAL BLF PLS/STATIC BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF ECC No. Run # 1 5788.07 Run # 1 5867.07 Run # 1 5887.10 Run # 1 5995.03 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: ED '" - ...... 2 1995 Date , ~ ~ Naska Oil & Gas Cons. Commission Anchorage PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA_PLUS Page: Date: 01/09/95 RUN DATE_RECVD 92-148 5520 92-148 92-148 92-148 SURVEY DWOP 407 92-148 SBT/GR/CCL 92-148 PROD 92-148 PLS 92-148 PFC 92-148 PFC 92-148 PERF 92-148 PDLS 92-148 DIL/SFL/GR 92-148 BHC/SL/GR T 8936-10040 BCS/DTE& CH/GR 1 R 0-9548 MWD SPERRY SUN R 01/06-01/25/93 R COMP DATE:02/ll/93 L 8353-9938 1 L 9150-9929 1 L 9420-9760 1 L 9600-9900 1 L 9230-9848 1 L 9500-9702 1 L 9420-9760 1 L 9537-10014 PHASOR PROCESS 1 L 9537-9992 1 02/06/93 03/05/93 03/05/93 03/05/93 02/01/93 03/30/93 06/03/94 04/12/93 02/22/93 07/12/93 06/03/93 02/01/93 02/01/93 Are dry ditch samples required? yes ~ And received? Was the well cored? yes (no) Analysis & description received? Are well tests required? yes ~ Received? yes Well is in compliance Initial COMMENTS yes yes ~ LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ~\ R-21 ~ ~\~S-36 {41-34-12-12) - ( 12-35-12-13 ) s-35 (23-26-12-12-) 1 PLS FINAL BL + RF 1 PLS FINAL BL + RF 1 CN/GR FINAL BL + RF 1 PLS FINAL BL + RF 1 PFC/PERF FINAL BL+RF i CN/GR FINAL BL +RF 1 PLS FINAL BL + RF Date: 1 December 1994 Transmittal of Data Sent by: MAIL Run # 1 ECC No. 4952.03 Run # 1 5089.04 Run # 1 · Run # 1 -~ 5770.02 5788.06 Run # 1 Run # 1 5803.07 5811.05 Run # 1 · 5867.06 Please sign and return to.'~~as Wireline Svi~~ces Anchorag_~m~AK 99518_ ~to (90~-7803 Received by: Date: STATE OF ALASKA ALAS,~-~OIL AND GAS CONSERVATION COMMISSIO;~-' REPORT SUNDRY WELL OPE , ATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing __ Alter casing Repair well Perforate X Other × 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1645' SNL, 1818' EWL, SEC. 35, T12N, R12E, UM At top of productive interval 1624' NSL, 2497' EWL, SEC. 26, T12N, R12E, UM At effective depth 3541' SNL, 2735' EWL, SEC. 26, T12N, R12E, UM At total depth 1743' SNL, 2542' EWL, SEC. 26, T12N, R12E, UM 5. Type of Well: Development X Exploratory Stratigraphic Sewice 6. Datum elevation (DF or KB) KBE=67. 74' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-35(33-35-12-13) 9. Permit number/approval number 92-148 / 10. APl number 50- 029-22324 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10020 feet Plugs (measured) 9240 feet 9940 feet Junk (measured) 9165 feet Casing Length Size Cemented Structural -- Conductor 110 20 27 c.f. Arcticset Surface 2865 13 3/8 2188/461c. f cs III/11 Intermediate 10082 9 5/8 1977c. f. Class "G" Production -- Liner 705 7 235 c.f. Class "G" Perforation depth: measured 9680'- 9778' Measured depth 111 2986 10115 9390-10020 True verticalde~h BKB 111 2915 9331 8656-9242 true vertical subsea 8924'- 9015' Tubing (size, grade, and measured depth) 5 1/2", 17#L-80 @ 9377' Packers and SSSV (type and measured depth) Packer @9317 RECEIVED 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 2840 2059 25 1114 · 4460 · 3894 199 1249 Tubing Pressure 267 313 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended 17. I hereby c~rtify that the foreg~)g is true and correct to the best of my knowledge. Signed ~ "~.44 I ~,;-~ Title Senior TechnicalAssistant I Form 10-404'Rev 06/15/88 Service Date SUBMIT IN DL4/PLI~:ATE 4/08/93 4/17/93 06/30/93 fjh 6/21/94 WELL S-35(33-35-12-13) REPERF/FRAC/ADDPERF The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 9680'-9710'MD 10278'-10300'MD Performed a Hydraulic Fracture using the following fluids: FLUIDS PUMPED DOWNHOLE INJ TEST #1: DATA FRAC #1: 130 219 10 FRAC: 164 42 10 13 17 17 18 19 139 0 23 214 404 BBLS 20# GEL INJECTIVITY TEST 20 BBLS 40~ GEL PREPAD TO ESTABLISH RATE BBLS 40# X-LINK GEL PAD W/No ESL BBLS 20# GEL DATA FRAC FLUSH BBLS DSL TO FREEZE PROTECT WELL 20 BBLS 40# GEL PREPAD TO ESTABLISH RATE BBLS 40# X-LINK GEL PAD W/NO ESL (*** GAL) Dirty I PPG 2 PPG 3 PPG 4 PPG 5 PPG 6 PPG 7 PPG 8 PPG 9 PPG 10 PPG 20# LINEAR GEL FLUSH The following additional interval were perforated using 3 3/8" guns, 4 SPF, random orientation and 120° phasing. 9546'-9586'MD Sag Perf RECEIVED ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 17 May 1994 Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 5%--tkq z-28 K-10 (31-05-1Z-14) J-lO (10-11-13) q2-I)-"~ S-38 (24-26-12-12) ~ ?--/Q-L s-33 (11-35-12-12) q~-~q~ s-35 (23-26-12-12-) qL-! I~ s-36 ( 41-34-12-12 ) cont/ /1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA /1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA /~ DIFF.TEMP. FINAL BL 1 DIFF.TEMP. RF SEPIA 1 DIFFTEMP/GR FINAL BL /1 DIFFTEMP/GR RF SEPIA /1 PLS FINAL BL 1 PLS FINAL RF SEPIA /~ PLS FINAL BL i PLS FINAL RF SEPIA 1 PLS FINAL BL 1 PLS FINAL RF SEPIA ,~ PLS FINAL BL 1 PLS FINAL RF SEPIA ~.1 PDK/GR/CCL FINAL BL 1 PDK/GR/CCL RF SEPIA ECC No. Run # 1 6196.00 Run # 1 Run # 1 6162.01 Run # 1 Run # 1 3556.04 Run # 1 Run # 1 4887.03 Run # 1 Run # 1 5840.03 Run # 1 Run # 1 5750.09 Run # 1 Run ~ 1 5867.05 Run # 1 Run # 1 5788.05 Run # 1 Run # 1 5858.05 Run # 1 l £C lr£b dUN S 1994 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 07/07/93 T9 84739 BPX/PBUOLOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-40q~'l~ PERF 06/28/93 91 F-l~l-Ilq PRODUCTION LOG 06/26/93 91 F-iE PRODUCTION LOG 06/26/93 91 N-20 ~'5~ PERF 07/01/93 91 07/01/93' 91 07/01/93 91 07/03/93 91 06/30/93 91 06/30/9~ 91 06/28/93 91 07/01/93 91 06/30/93 91 9200.00-10194.00 ATLAS 5 " 10980.00-12361.00 ATLAS 5 " 10980.00-12361.00 ATLAS 5 " 9915.00-10056.00 ATLAS 5 " 9700.00- 9950.00 ATLAS 5 " 9058.00- 9253.00 ATLAS 5 " 900Q.00- 9200.00 ATLAS 5 " 10100.00-10259.00 ATLAS 5 " 9500.00- 9702.00 ATLAS 5 " 9765.00- 9986.00 ATLAS 5 " 9200.00- 9350.00 ATLAS 5 " 13940.00-14224.00 ATLAS 5 " Information Control Well Records RECEIVED ,. JUL 12 ]993 A/asks 0JJ & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 BP/PBU ~. OGS DATE: 04/21/93 T# 84491 Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ,A-04~~,O~ PFC ~.~A-23 ~,90 PDK-100 %' A-24~-~ PFC ,~,.% B-07 .\~ PFC B-15~~ PRODUCTION LOG B-34~'%~ PFC .~E-10 __. PRODUCTION LOG ~\'[~ E-11~'~ PRODUCTION LOG \~H-17 ,~ PFC H-2 PFC ~%,~J-15 ,~,~ LEAK DET .~S-I~~ pRODUCTION LOG k X-02 PRODUCTION LOG Y-i~~ PRODUCTION LOG Y-1 PRODUCTION LOG 04/07/93 #1 04/06/93 #1 04/04/93 #1 04/17/93 #1 04/16/93 #1 04/15/93 #1 04/11/93 #1 04/12/93 #1 04/17/93 #1 04/14/93 #1 04/06/93 #1 04/13/93 #1 04/06/93 #1 04/15/93 #1 04/04/93 #1 04/08/93 #1 04/16/93 #1 04/10/93 #1 04/10/93 #1 10500.00-10893.00 ATLAS 5 " 11050.00-11495.00 ATLAS 5 " 10754.00-11037.00 ATLAS 5 " 11550.00-11800.00 ATLAS 5 " 9180.00- 9450.00 ATLAS 5 " 11600.00-11950.00 ATLAS 5 " 11371.00-1].795.00 ATLAS 5 " 8700.00- 9200.00 ATLAS 5 " 11450.00-11694.00 ATLAS 5 " 10350.00-10705.00 ATLAS 5 " 9985.00-10240.00 ATLAS 5 " 10280.00-10670.00 ATLAS 5 " 9604.00- 9920.00 ATLAS 5 " 11000.00-11500.00 ATLAS 5 " 3000.00-11610.00 ATLAS 5 " 9600.00- 9900.00 ATLAS 5 " 9500.00- 9920.00 ATLAS 5 " 9930.00-10320.00 ATLAS 5 " 2200.00-10280.00 ATLAS 5 " Information Control~ O~ Well Records ~' _ ~ '% BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03-16-93 T# 84385 BP CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. F-14--~O'kT~CL 03/08/93 #1 J-23'~'~\ LEAK DET 03/08/93 #1 M-20--~'~ PRODUCTION LOG 03/08/93 #1 S-01 ~b-~ PDK-100 03/07/93 #1 S-34 ~-~PRODUCTION LOG 03/10/93 #1 S-359~-~%~ PRODUCTION LOG 0.3/11/93 #1 W-18~-~ GR 03/11/93 #1 W'25~~ GR - ' 03/11/93 #1 9170.00-10309.00 ATLAS 5 " 5900.00- 9800.00 ATLAS 5 " 9300.00- 9808.00 ATLAS 5 " 9950.00-10620.00 ATLAS 5 " 9700.00-10540.00 ATLAS 5 " 9150.00- 9929.00 ATLAS 5 " 8600.00- 9250.00 ATLAS 5 " 10270.00-10556.00 ATLAS 5 " Information Control Well Records RECEIVED UAR ~ 0 1993 A/aska Oil & Gas Cons. Commission Anchorage ALASKA OIL AND GAS CONSERVATION CUMMISSION WELL COMPLETION OR RECOMP LETION REPORT AN 1. Status of Well Classification of Service Well OIL [] GAS I-I SUSPENDED [] ABAN~ [] SERVICE I-I 2. Name of Operator ?. Permit Number BP Exploration 92-148 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 so- 50-029-22324 4. Location of well at surface 9. Unit or Lease Name 1645' SNL, 1818'EWL, SEC. 35, T12N, R12E, UM ~- -, .. ............ ~ '~t' .':' .--.. ,--"r~.~-, Prudhoe Bay Unit ~ ~ ':" .... ~ ~ ]~O~'f~'~i 10. Well Number At Top Producing Interval 1624'NSL, 2497'EWL, SEC. 26, T12N, R12E, UM ~11 ...... ~z'/~ ' '~-~----- r---~-~-. ~ ~ ~J~,~i.,~. ~..[ ~ 11.S'35Field (33-35-and Pool12' 12) 1743' NSL, 2542' EWL, SEC. 26, T12N, R12E, UM 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 67. 74' I ADL 28257 '12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. o~ Aband. 115. Water Depth, if ollshore 116. No. of Completions 1/5/93 1/20/93 2/9/93I N/Aeet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey ~:)0. Depth where SSSV set ~21. Thickness of Permafrost 10020' MD/9240' TVD 9940' MD/9165' TVD YES I~ NO []! 2102feet MD! 1900' (Approx.) 22. Type Electric or Othe~ Logs Run DIL/BHC/GR/SP 23. CASING, LINER AND CEMENTING RECORD SE'ri'lNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20' 91.5# H-40 32' 110' 30" 27 cu ft Arcticset 13-3/8' 68# K55/L-80 33' 2986' 16" 2188 cufl CS 111/461 cu ft CS II 9-5/8' 47# L-80 35' 9536' 12-1/4" 1977cu fl Class "G" 7' 26# L-80 9390' 10020' 8- I/2" 235 cufl Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MDI PACKER SET (MD) Gun Diameter 3-3/8" 4spt 5-1/2", 17#,L-80 9377' 9317' MD TVD .. 9680'-9778' 8924'-9015' ;~6. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ,,, 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 2/11/93 I Gas Lift Date of Test Hours Tested =RODUCTION FOR OIL-BBL 3AS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pre.~ure CN.CAJI.~TED OIL-BBl. GAO-~F WAIER-BBL ~lt. GR^¥11¥-API (corr} Press. 24~HOUR RATE 28. CORE DATA Brief description o! lithology, porosity, fraclures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVEr , ,lucida U~i & Gas Cons. Corr~m~ss,~ AnchoragO Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE i.~. 30. GEOLOGIC MARKERS dORMATION TESTS NAME Include interval lested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 9544' 8798' Shublik 9586' 8837' Sadlerochit 9677' 8921' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~Tit le Drilling_ Engineer Supervisor Date Z. ( ~.G [q~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic P~~?~~,~ater jection, Gas Injection, Shut-in, Other-explain. ~ Item 28: If no cores taken, indicate "none". MAR 0,5 In- Form 10~407 Alaska 0ii & [-;as ~{)~, ,..,. ....,,.ss~, Anchora.~.'!e BP/AAI SHARED SERVICE WELL: S-35I BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: DAILY OPERATIONs PAGE: 1 ACCEPT: 01/05/93 09:30 SPUD: 01/05/93 05:30 RELEASE: OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 01/06/93 (1) TD: 800' ( 800) 01/07/93 (2) TD: 1790' ( 990) 01/08/93 (3) TD: 3000' (1210) 01/09/93 ( 4) TD: 3000' ( 0) 01/10/93 ( 5) TD: 4380' (1380) 01/11/93 ( 6) TD: 5600'(1220) 01/12/93 ( 7) TD: 6827' (1227) RUN GYRO SURVEY MW: 8.8 VIS:300 MIRU. NIPPLE UP RISER & FLOW LINE. MIX SPUD MUD RIG UP JET F/FLOW LINE. FUNCTION TEST DIVERTER. PU BHA DRESS STABS & MU SAME. DRILG & GYRO SURVEYS F/104 TO 800'. DRLG 16" HOLE MW: 9.5 VIS:300 DRLG TO 1006. CIRC RUN GYRO SURVEY .10. DRL TO 1260. CIRC RUN GYRO SURVEY .10. DRLG TO 1514. CIRC RUN GYRO SURVEY .10. DRL TO 1546. CIRC & POH. CHANGE JARS. RIH NOT FILL. DRLG & SURVEYS TO 1790. RUNNING 13-3/8" CSG. MW: 9.5 VIS:137 DRLG & SURVEYS TO 3000'. CIRC. WIPER TRIP SLM NO CORR. CIRC. BTMS. UP F/ 13-3/8" CSG. POH TO RUN CASG. RU & RUN 13-3/8". TD 16" HOLE @ 2000 HRS. LET COOL CSG HEAD MW: 8.4 VIS: 28 RUN 13-3/8 CSG. CIR & COND MUD. TEST CMT LINES TO 3000 PSI. DO TOP CMT JOB. N/D DIVERTER LINES. CLEAR FLOOR. MAKE FINAL CUT. WRAP & LET COOL. DRILLING @ 4380' MW: 9.6 VIS: 38 TEST CSG HEAD TO 1300 PSI. NU BOPE. TEST BOPE & SET WEAR RING. PU BHA. RIH TO FC TOP @ 2908'. CIRC. DRILL OUT FC @ 2908' MEDIUM HARD CEMENT TO 2983', SHOE @ 2984, CEMENT TO 3000' & FM TO 3010'. PERFORM LOT @ 3010'. DRILLING F/3010' TO 4006'. CBU. SHORT TRIP TO 13-3/8 SHOE. DRILLING F/4006' TO 4308'. DRILLING MW: 9.9 VIS: 42 DRILL FROM 4380' TO 5023'. CLEAN CLAY BALLS OUT OF AUGER. WIPER TRIP TO 13-3/8 CASG SHOE @2945' DRILL FROM 5023' TO 5255' CIRC. TRIP OUT OF HOLE FOR BIT #3. TRIP IN HOLE WITH ~IT#3. REAM FROM 5105' TO 5255' DRILL FROM 5255' TO 5600' RIG REPAIR MW:10.2 VIS: 43 DRILL FROM 5600' TO 6263' SHORT TRIP TO 5140' DRILLF ROM 6263' TO 6827' REPAIR ELECTRIC BREAKERS ON SHALE SHAKERS. RECEIVEr" MAR 0,5 1993 Alaska 0ii & Gas Cons. Anchomg~ WELL : S-35I OPERATION: RIG : NABORS 28E PAGE: 2 01/13/93 (8) TD: 7540'( 713) 01/14/93 ( 9) TD: 8085' ( 545) 01/15/93 (10) TD: 8700'( 615) DRILLING MW:10.2 VIS: 40 REPAIR ELECTRIC BREAKERS ON SHALE SHAKERS. DRILL FROM 6827' TO 7483'. CIRC. TRIP. CHANGE OUT DYNA DRILL & JET. TRIP IN HOLE. CUT & SLIP DRILLING LINE 104' TRIP. DRILL FROM 7488' TO 7540'. DRILLING MW:10.2 VIS: 42 DRIL FROM 7540' TO 7820' TRIP OUT OF HOLE FOR BIT. HOLE WAS RATTY & PULLED TIGHT FROM 7770' UP TO 7109'. CHANGE BIT. TRIP IN HOLE. BRIDGE @ 7325' REAM FROM 7767' TO 7827'. DRILL FROM 7827' TO 8085'. DRILLING DRILL FROM 8085' TO 8700' MW:10.2 VIS: 41 01/16/93 (11) TD: 9120' ( 420) 01/17/93 (12) TD: 9410' ( 290) 01/18/93 (13) TD: 9548' ( 138) 01/19/93 (14) TD: 9570' ( 22) 01/20/93 (15) TD: 9985' ( 415) 01/21/93 (16) TD:10020'( 35) 01/22/93 (17) TD:10020 PB: 9940 DRILLING MW:10.2 VIS: 39 DRILL FROM 8700 TO 8760'. TRIP OUT OF HOLE FOR BIT %6. CHANGE BIT & TRIP IN HOLE. REAM FROM 8680' TO 8760'. DRILL FROM 8760' TO 9120'. DRILLING MW:10.2 VIS: 39 DRIL FROM 9120' TO 9156'. CIRC. TRIP IN HOLE W/BIT %7. REAM FROM 9068' TO 9156'. DRILL FROM 9156' TO 9410'. RUN 9-5/8 CASG MW:10.2 VIS: 38 DRLG F/9540 TO 9548'. CBU. SHORT TRIP TO 8168'. CIRC. POH & L/D BHA. PULL WEAR RING. R/U & RUN 9-5/8" CSG. DRILLING 9570' MW: 9.4 VIS: 37 CIRC. RD CEMENT HEAD & CLEAR RIG FLOOR. PU BHA. RIH TO 9438. CBU. TEST 9-5/8. DRILL OUT CMT, PLUGS TO 9453, FC @ 9554, CMT TO 9418. TEST CSG TO 3000 PSI FOR 10 MIN. CMT TO 9548. DRILLING F/ 9548 TO 9554'. CIRC & COND MUD. DRILLING 9554' TO 9570'. DRILLING @ 9985' MW: 9.3 VIS: 42 DRILLING F/9570' TO 9694'. CBU, DROP SURVEY & PUMP PILL. POH, CHANGE BIT & RIH TO 9622'. REAM F/9622' TO 9694'. DRILLING F/9694' TO 9985'. RUN 7" LINNER MW: 9.3 VIS: 39 DRILLING F/9985' TO TD@ 10020'. SHORT TRIP TO 9536'. RIH TO 2700'. SLIP'& CUT DRILLING LINE. RIH TO 10020'. CBU W/ HV SWEEP. POOH & LD BHA. RU & RUN 7" LINER. POH LAYING DOWN 5" DP. MW: 8.5 Seawater RUN 7" LINER ON 5" DP TO 9-5/8 SHOE. RUN LINER ON DP TO 10020. CIRC. PU BHA W/7" & 9-5/8" SCRAPERS & RIH TO 9836'. WASH F/9836' TO LC TOP @ 9940'. POH LAYING DOWN 5" DP. RECEIVED MAR 0 5 199 Alaska Oil & Gas Cons. Anchorage WELL : S-35I ,OPERATION: RIG : NABORS 28E PAGE: 3 01/23/93 (18) TD:10020 PB: 9940 01/24/93 (19) TD:10020 PB: 9940 01/25/93 (20) TD:10020 PB: 9940 SETT SSSV MW: 8.5 Seawater SPACE OUT TUBING. MU HNGR & CONTROL LINES. RU OTIS PULL SSSV DUMMY. PULL SSSV DUMMY & SET PLUG & BVN. OTIS PULL PLUG OUT BVN. PULL DUMMY GLM #4 & SET DUMMY SSSV. TEST TBG. OTIS SET X NIPPLE PLUG & RD. PULL DUMMY GLV & SET SSSV. RD OTIS. RUN 5-1/2 TBG & CONTROL LINE MW: 8.5 Seawater TEST 7" LAP & 9-5/8 W/SEAWATER TO 3500 PSI. CIRC CORROSION INHIBITIOR. POH LAYING DOWN DP & BHA. RU ATLAS RUN #1 SBT. RU & RUN 5-1/2 TBG. TO 2100'_ INSTALL, TEST SSSV & CONTROL LINES TO 5000 PSI. RUN 5-1/2 TBG & CONTROL LINES. RELEASED RIG @ 1600 1/24/93 MW: 8.5 Seawater SET BPV. N/D BOPE. NU CONTROL LINES & ADAPTER FLANGE. NU/XMAS TREE. TEST TREE. PULL TWO WAY CHECK VALVE. PUMP 138 BBLS DIESEL DOWN ANN. U TUBE DIESEL. SET BPV. SECURE WELL. RELEASED RIG @ 1600 HRS 1/24/93. SIGNATURE: (drilling superintendent) DATE: MAR 0,5 199, Alaska Oil & @as Cons. Anchora,~e S'~'~'"~RY-SUN DRTLLTNG SERVTCES ANCHORAGE ALASKA PAGE PRUDROE BAY DRZLLZNG PBU/S-35Z 500292232400 NORTH SLOPE COHPUTATZON DATE: 1/22 /93 ORIGINAL DATE OF SURVEY: 011793 MWD SURVEY JOB NUNBER: AK-HW-30002 KELLY BUSHZNG ELEV. = 67.74 OPERATOR: BP EXPLORATZON FT. TRUE SUB-SEA NEASD VERTZCAL VERTZCAL DEPTH DEPTH DEPTH COURS COURSE DL ZNCLN DZRECTZON DG NN DEGREES DG/1 S TOTAL RECTANGULAR COORDZNATES O0 NORTH/SOUTH EAST/WEST VERT. SECT. 0 ,00 -67,74 482 482,00 414.26 723 722.99 655,25 979 978.99 911.25 1225 1224.99 1157.25 0 0 N .00 E .00 0 18 S 33.O0 E .06 0 12 S 18.00 W .10 0 6 N 68.00 W .09 O 6 S 78.00 E .08 .OON ,OOE .00 1.06S .69E -,90 1,99S .90E -1,77 2,33S ,56E -2.17 2.29S .57E -2.13 1489 1488.99 1421.25 1570 1569.98 1502.24 1677 1676.79 1609,05 1772 1770.87 1703.13 1900 1896.74 1829,00 0 24 S 78,00 E .11 0 48 N 4.60 E 1.16 5 30 N 16,00 W 4.45 10 18 N 14,40 W 5,06 10 36 N 7.10 W 1,06 2,53S 1.69E -2,14 2.03S 2.02E -1;58 3,65N .66E 3,71 16,26N 2,71W 15.38 39,03N 7.01W 36,82 2027 2021.18 1953,44 2154 2144,62 2076.88 2281 2266,75 2199.01 2471 2446.48 2378,74 2694 2651,93 2584,19 12 30 N 2,40 E 2,11 14 36 N 6,30 E 1,80 17 12 N 6,00 E 2,05 20 36 N 6,10 E 1.79 25 6 N 6.00 E 2.02 64,35N 7.88W 61.45 94.00N 5,55W 90,96 128,59N 1,83W 125.59 189,78N 4,66E 186.84 275.87N 13.78E 273,00 2821 2766.60 2698.86 2920 2855.43 2787.69 3106 3023.01 2955.27 3295 3193.58 3125.84 3517 3390,82 3323,08 25 47 N 7.20 E .68 26 36 N 8.80 E 1.08 24 47 N 8.70 E ,97 26 12 N 8,20 E ,75 28 23 N 8.20 E ,99 330,08N 20.06E 327,37 373.35N 26,15E 370,99 453.07N 38.42E 451,54 533,54N 50,37E 532,77 634,30N 64,89E 634,40 3740 3587.62 3519,88 3995 3814.91 374.7,17 4185 3985,02 3917,28 4376 4155,80 4088.06 4566 4326.06 4258.32 27 42 N 13,30 E 1.12 26 12 N 14,20 E ,61 26 42 N 15,40 E .39 26 30 N 15,80 E ,14 26 12 N 14.00 E .45 737.23N 84.38E 739,14 849.48N 111,82E 854,62 931.30N 133.44E 939,11 1013.67N 156.44E 1024,42 1095,15N 178,13E 1108,60 4757 4497,44 4429,70 4948 4668.89 4601.15 5105 4809.94 4742,20 5296 4980.37 4912,63 5583 5234.25 5166,51 26 12 N 14,20 E ,05 26 6 N 14.90 E .17 26 0 N 13,60 E .37 27 42 N 7.70 E 1,65 27 53 N 10.80 E .51 1176.94N 198.67E 1192.85 1258.42N 219,82E 1276.92 1325.24N 236.79E 1345.78 1409,94N 252,59E 1431.93 1542.01N 274,11E 1565,63 5774 5402,81 5335,07 5965 5571,84 5504,10 6156 5741,02 5673,28 6347 5911.94 5844,20 6537 6083,75 601'6.01 28 12 N 11,20 E ,19 27 17 N 13.50 E ,73 28 0 N 14.70 E .47 25 0 N 17,90 E 1,74 25 36 N 11,90 E 1,39 IIIiIOI:ILIqED Date . , ..... 1630,17N 291.25E 1655.44 1717,03N 310,24E 1744.34 1802,99N 331.84E 1832,89 1884,78N 355,63E 1917,80 1963,17N 376.44E 1998,76 REEEIVED MAR 0 5 199,] Alaska 0ii & 6as,Oons. t;om~-nissio~ Anchorage S~RY-SUN DRILLING SERVICES ~-"" ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/S-35I 500292232400 NORTH SLOPE COMPUTATION DATE: 1/22/93 DATE OF SURVEY: 011793 MWD SURVEY JOB NUMBER: AK-MW-30002 KELLY BUSHING ELEV. = 67,74 OPERATOR: BP EXPLORATION FT, TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE D DIRECTION DEGREES DG/ LS TOTAL RECTANGULAR COORDINATES 100 NORTH/SOUTH EAST/WEST VERT. SECT. 6726 6253,47 6185,73 6917 6425,90 6358,16 7139 6628,47 6560,73 7355 6825.56 6757,82 7543 6995.65 6927.91 26 36 N 14,20 E 24 17 N 11,90 E 24 0 N 9,30 E 24 17 N 8,40 E 26 6 N 10,10 E ,75 2044,14N 395,245 2081.87 1,31 2124.05N 413.835 2163.88 ,50 2213.30N 430,545 2254,67 ,22 2300,62N 444.145 2342.94 1,03 2379,60N 457.045 2422,90 7730 7163.87 7096,13 7825 7249,54 7181,80 7948 7360,42 7292,68 8078 7477,11 7409,37 8267 7646.25 7578,51 25 42 25 30 25 47 26 30 26 30 N 10,10 E N 10,60 E N 11,30 E N 10,10 E N 13.50 E ,21 2460,02N 471.365 2504.55 ,31 2500,40N 478,745 2545.59 .35 2552.67N 488.855 2598.83 ,67 2608,97N 499,485 2656.11 ,80 2691.48N 516.725 2740.41 8455 7814,06 7746,31 27 8642 7980,60 7912,86 27 8833 8150.93 8083,19 26 9071 8364.65 8296,91 25 9209 8489,36 8421.62 25 6 N 12.90 E 0 N 13,10 E 47 N 16.20 E 23 N 13,50 E 17 N 17.50 E ,35 2774,00N 536,075 2825,13 ,07 2856,86N 555.205 2910.15 ,74 2940.44N 577.045 2996.41 ,77 3041,60N 603.935 3100,91 1,24 3098,50N 619,705 3159.82 9364 8630.82 8563.08 22 9427 8688,98 8621,24 22 9473~.7~8731.61 8663.87 21 9548*-8801 25 8733.51 21 53 N 17,50 E 1,55 17 N 18,40 E 1,10 47 N 20,90 E 2,31 47 N 20,90 E ,03 THE CALCULATION PROCEDURES ARE BASED THREE-DIMENSION MINIMUM CURVATURE 3158.85N 638,735 3181.88N 646,195 3198,14N ~6 651,995 3~2~,16N 661,935 ON THE USE OF METHOD. HORIZONTAL DISPLACEMENT = 3291,41 FEET AT NORTH 11 DEG, 36 MIN, EAST AT MD = 9548 3222.76 3246,83 3263.92 /0 3291 ,41 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 11,60 DEG. S¢'"~RY-SUN DR'[LL'rNG SERVTCES ANCHORAGE ALASKA PAGE PRUDROE BAY DRZLLZNG PBU/S-35Z 500292232400 NORTH SLOPE COMPUTATZON DATE' 1/22/93 DATE OF SURVEY: 011793 JOB NUMBER: AK-MW-30002 KELLY BUSHING ELEV. = 67.74 OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTZCAL RECTANGULAR COORDINATES DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -67.74 .00 N .00 E 1000 999.99 932.25 2.31 S .52 E 2000 1994.79 1927.05 58.61 N 8.03 W 3000 2926.96 2859,22 408.75 N 31.63 E 4000 3819.40 3751.66 851.62 N 112.36 E ,00 .01 .01 5.21 5.20 73,04 67.83 180.60 107.56 5000 4715.59 4647.85 1280.53 N 225.70 E 6000 5602,94 5535.20 1732.64 N 313.99 E 7000 6501.55 6433,81 2157,48 N 420.87 E 8000 7407.23 7339.49 2574,86 N 493.29 E 9000 8300.51 8232.77 3011.98 N 596.82 E 284.41 103.81 397.06 112.65 498,45 101.39 592,77 94.31 699.49 106.72 9548 8801 .25 8733.51 3224.16 N 661 .93 [~© 74.?, THE CALCULATTON PROCEDURES ARE BASED THREE-DIMENSTON MINIMUM CURVATURE E 746.75 ON THE USE OF METHOD. 47.26 FT. S~RY-SUN DRZLLZNG SERVZCES~'x ANCHORAGE ALASKA PAGE PRUDHOE BAY DRTLLTNG PBU/S-35Z 500292232400 NORTH SLOPE COMPUTATTON DATE: 1/22/93 DATE OF SURVEY: 011793 JOB NUMBER: AK-MW-30002 KELLY BUSHZNG ELEV. = 67.74 OPERATOR: BP EXPLORATZON FT, ZNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTZCAL VERTZCAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDZNAT NORTH/SOUTH EAST/WE ES MD-TVD VERTZCAL ST DZFFERENCE CORRECTZON 0 ,00 -67,74 67 67,74 ,00 167 167,74 100.00 267 267,74 200,00 367 367,74 300,00 .00 N .00 E .00 .00 N .00 E .00 .00 .00 N .00 E .00 .00 .12 S .08 E .00 .00 .56 S .36 E .00 .00 467 467,74 400.00 567 567.74 500,00 667 667,74 600.00 767 767,74 700.00 867 867,74 800,00 1,00 S ,65 E .,00 .00 1,44 S ,93 E ,00 .00 1,80 S .96 E ,01 .00 2,14 S .85 E .01 .00 2.40 S .74 E .01 .00 967 967,74 900,00 1067 1067,74 1000,00 1167 1167,74 1100,00 1267 1267.74 1200,00 1367 1367.74 1300,00 2,34 S ,57 E .01 .00 2.27 S .41 E .01 ,00 2,27 S ,47 E .01 ,00 2,31 S ,64 E ,01 ,00 2,36 S ,87 E ,01 ,00 1467 1467.74 1400.00 1567 1567,74 1500,00 1667 1667.74 1600,00 1768 1767.74 1700,00 1870 1867,74 1800,00 2,50 S 1,55 E ,01 .00 2,04 S 2.01 E ,02 .01 2,88 N .88 E .17 .15 15,74 N 2,57 W 1.09 ,92 33,64 N 6,34 W 2.75 1.67 1972 1967,74 1900,00 2074 2067.74 2000,00 2177 2167,74 2100,00 2282 2267,74 2200.00 2387 2367,74 2300,00 52,94 N 7.99 74,67 N 7.45 100,09 N 4,88 128,90 N 1,79 161.53 N 1.66 4.62 1.86 6.95 2.34 10.18 3.23 14.30 4.12 19,55 5.25 2493 2467.74 2400,00 2601 2567.74 2500.00 2711 2667,74 2600,00 2822 2767.74 2700,00 2933 2867,74 2800.00 197.84 N 5.52 238,30 N 9,82 283.24 N 14.56 330,62 N 20.13 379.45 N 27,10 E 26,01 6,46 E 33.98 7,97 E 43,72 9,74 E 54,52 10,80 E 66,03 11,50 3045 2967,74 2900.00 3155 3067,74 3000.00 3266 3167,74 310'0.00 3377 3267,74 3200.00 3490 3367,74 3300,00 427,82 N 34,56 473,50 N 41.55 520,96 N 48.56 569,66 N 55.57 621,95 N 63,11 E 77,38 11,35 E 87,54 10.16 E 98,46 10.92 E 109.91 11,45 E 123.02 13,11 SP~'~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDNOE BAY DRILLING PBU/S-35I 500292232400 NORTH SLOPE CONPUTATION DATE: 1/22 /93 DATE OF SURVEY: 011793 JOB NUMBER: AK-HW-30002 KELLY BUSHING ELEV. = 67.74 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL HEASD VERTICAL VERTICAL RECTANGULAR COORDINAT DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WE ES HD-TVD VERTICAL ST DIFFERENCE CORRECTION 3604 3467.74 3400.00 675.47 N 70.82 3717 3567.74 3500.00 727.08 N 81.98 3830 3667,74 3600.00 778.17 N 94.05 3942 3767.74 3700.00 826.98 N 106,13 4053 3867.74 3800.00 874,69 N 118.20 E 136.70 13.68 E 149.80 13.10 E 162.75 12.94 E 174.69 11,94 E 186,14 11.45 4165 3967.74 3900.00 922.92 N 131.14 4277 4067.74 4000.00 971.41 N 144.49 4389 4167,74 4100.00 1019.40 N 158.06 4501 4267,74 4200,00 1067.31 N 171.19 4612 4367.74 4300.00 1115.05 N 183.09 E 197,92 11.78 E 209,85 11,93 E 221,60 11.75 E 233,26 11.66 E 244,71 11,45 4723 4467.74 4400.00 1162.77 N 195.09 4835 4567.74 450'0.00 1210.48 N 207.16 4946 4667.74 4600.00 1257.87 N 219.68 5058 4767.74 4700.00 1305.23 N 231.95 5169 4867.74 4800.00 1353,10 N 242,98 E 256.16 11.45 E 267.61 11.45 E 278.98 11.37 E 290,31 11.33 E 301.72 11.41 5281 4967.74 4900.00 1403.40 N 251.68 5394 5067.74 5000.00 1455.40 N 258.73 5507 5167.74 5100.00 1507,42 N 267.51 5620 5267.74 5200.00 1559.43 N 277.43 5734 5367.74 5300.00 1611.72 N 287.60 5847 5467.74 5400.00 1664.32 N 298.01 5960 5567.74 5500.00 1714.97 N 309.74 6073 5667,74 5600.00 1765.30 N 321.95 6186 5767.74 5700.00 1816,56 N 335.47 6298 5867,74 5800.00 1864.77 N 349.34 E 314.00 12.28 E 326.94 12.93 E 340.01 13.07 E 353.16 13.15 E 366.47 13.31 E 379.94 13.47 E 392.65 12.71 E 405.26 12.62 E 418.45 13.18 E 430.33 11.88 6408 5967.74 5900.00 1909.77 N 363.21 6519 6067,74 6000.00 1955,68 N 374.82 6630 6167.74 6100.00 2002.61 N 384.83 6741 6267.74 6200.00 2051,07 N 396,99 6853 6367.74 6300.00 2098.36 N 408.41 E 440.87 10.53 E 451.52 10.65 E 462,43 10.92 E 474.22 11.79 E 485,45 11,23 6962 6467.74 6400.00 2142.54 N 417.73 7072 6567.74 6500.00 2186.62 N 426,18 7181 6667.74 6600.00 2230.56 N 433.37 7291 6767.74 6700.00 2274.79 N 440.32 7401 6867.74 6800.00 2319.46 N 446.92 E 495.17 9.72 E 504,79 9.62 E 514.25 9.46 E 523,82 9.57 E 533.54 9,72 MAR 0 § 199; Alaska Oil & Gas Cons. Anchorage S~¢""~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/S-35I 500292232400 NORTH SLOPE COMPUTATION DATE: 1/22/93 DATE OF SURVEY: 011793 JOB NUMBER: AK-MW-30002 KELLY BUSHING ELEV. = 67.74 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 7511 6967.74 6900,00 2366.14 N 454.64 E 544.18 10.65 7623 7067.74 7000.00 2414.37 N 463.23 E 555.54 11.35 7734 7167.74 7100.00 2461.85 N 471.69 E 566.56 11.02 7845 7267.74 7200.00 2508,93 N 480.33 E 577.43 10.86 7956 7367.74 7300.00 2556,14 N 489.55 E 588.39 10.97 8067 7467.74 7400.00 2604.37 N 498.66 E 599.79 11.40 8179 7567.74 7500.00 2653.41 N 507.59 E 611,53 11.74 8291 7667,74 7600.00 2701.90 N 519.22 E 623.27 11,74 8402 7767.74 7700.00 2750,90 N 530.78 E 635.23 11,96 8515 7867,74 7800.00 2800,78 N 542.20 E 647.57 12.33 8627 7967,74 7900.00 2850.48 N 553,72 E 659.83 12.26 8739 8067.74 8000.00 2900.08 N 565.32 E 672,06 12,23 8851 8167.74 8100,00 2948.59 N 579.41 E 684.09 12.03 8963 8267.74 8200.00 2996.85 N 593,18 E 695.98 11.89 9074 8367.74 8300.00 3043.03 N 604,27 E 706.68 10,70 9185 8467.74 8400.00 3088.75 N 616.63 E 717.35 10.66 9295 8567.74 8500.00 3133.37 N 630,70 E 727.76 10.41 9404 8667.74 8600.00 3173.61 N 643.44 E 736.31 8.55 9511 8767.74 8700.00 3211.64 N 657.15 E 744.17 7.86 9548 8801.25 8733.51 3224,16 N 661.93 E 746.75 2.58 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 BP/PBU CH LOGS DATE: 02/12/93 Enclosed is your copy of the materials listed below. If you have any . questions, please contact BP Well Records at (907) 564-4004. -~28 ~f~ PRODUCTION LOG 02/09/03 #1 '.~~5,t'~A~~P~cPRODUCTION LOG 02/08/93 ~ ~.,. 02/09/93 ~1 PFC/~/~C~ 02/08/93 ~1 Information Control Well Records 10800.00-11130.00 ATLAS 5 " 10450.00-10710.00 ATLAS 5 " 9230.00- 9848.00 ATLAS 5 " 8350.00- 9660.00 ATLAS 5 " PERMIT#. ,,~ - COMPLETION DATE AOGCC GEOLOGICAL MATERIALS INVENTORY LIST I~'. _ WELL NAME ~ I .J~ . Iq:~ CO. CONTACT "' cheCk off 0r listdata as it' is reCeived.*list received date for 407. if not' required list as NR 407' I * ~3}:~/3 driliin§ historY ~'"' "suwe¥1 I l' well iests I~ I"~ore descripti°dk~_ cored interU~ls core analysis /0~ .... dh/ditch intervals ~digital data ,, ~~,, ,,, ,, .... '," ,, ,, -~~_o ~ ,~ I i I i i I ii i i i I pll~ iiiii i i i i i i iiii j i i iiiii i i i i i ii I ii i " LOG TYPE . RUN INTERVALS SCALE ...... NO. [to thc nearest footl Iinchl100'! Iii II Iii I Illl I I I Ill I I I II I I I I ...... q .............. i i II II iiii i i iiii ii i i ii i II IL Iii L .... i'll ..... i21..... .... i,3i~ ........................ -: i i ii iii ii i I II,llJl~ll I II il' I JI I I I I I I I I 17! III IIItl I I Ill I I I I II II I I I I II I II I I I II I I I I I I I I BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/28/93 T# 84277 BP/ PBU OH MAGNETIC TAPE Enclosed is your copy of the materials listed below. questions, please contact BP Well Records at (907) S-35 OH/BHCS 8936.00-10040.00 API#500292232400 FIN 01/20/93 #1 1600BPI If you have any 564-4004. SCH REF#93037 Information Control Well Records BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 10-26-93 T% 84294 BP CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 01/21/93 REF#124623 01/23/93 REF#124631 01/21/93 REF#124629 01/22/93 REF#124630 01/22/93 REF#114971 Information Services Well Records PRODUCTION LOGGING SERV ATLAS PRODUCTION LOGGING SERV ATLAS PRODUCTION LOGGING SERV ATLAS CASING COLLAR LOG (PERF ATLAS SEGMENTED BOND LOG; GAM ATLAS R ¢EIVED FEB 0 1 19 5 CommJ~Jp.n ~ ~l & Gas Cons. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/27/93 T# 84298 BP OH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. -35 ~41~¢~/ OH 01/20/93 REF# 01/20/93 REF# BHC SONIC GAMMA RAY SCH DUAL INDUCTION SFL GR ( SCH Information Services Well Records WALTER J. HICKEL, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION .; 300'1 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3'192 PHONE: (907) 279-'1433 TELECOPY: (907) 276.7542 December 31, 1992 Michael Zanghi Drilling Engineer Supervisor BP Exploration P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit S-35i BP Exploration Permit No. 92-148 Sur. Loc 1645'FNL, 1818'FWL, Section 35, T12N, R12E, UM Btmhole Loc. 3519'FNL, 2795'FEL, Section 26, T12N, R12E, UM Dear Mr. Zanghi: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman BY ORDER OF T~IE COMMISSION dlf/Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~;,---,, STATE OF ALASKA ~--': ALASKA _ AND GAS CONSERVATION CO,v,.MISSION PERMIT TO DRILL 20 AAC 25.005 fla. Type of work Drill E1 Redrilln]lb. Type of well.'E'x'l~lO-~i~;;O Stratigraphic Test [] Development Olio Re-Entry n DeepenOI Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 67.74feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28257 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 2o ^^c 2s.o2s) 1645' FNL, 1818' FWL, Section 35, T12N, R12E, UM Prudhoe Bay Unit At top of productive interval !8. Well number Number 3608' FNL, 2813' FEL, Section 26, T12N, R12E, UM S-35i 2S100302630-277 At total depth 9. Approximate spud date Amount 3519' FNL, 2795' FEL, Section 26, T12N, R12E, UM January 2, ~ I f-')~J,~ $200,000.00 'J2. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and 'rVO) property line 1645 feet S-ll @500'MD =31.9 feet 2560 10014'MD/9239' TVD'eet 16. To be completed for deviated wells 17. Anticipated pressure (s,~ 20 AAC 2s.03s (e){2)) Kickoff depth ~oofeet Maximum hole angle 2~., o Maximum sudace 2800pslg At total depth (TVD) ~O0'/35~)Opslg 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5~ H-40 Weld 80' 32' 32' 110' 110' 11 yds AS 16" 13-3/8" 68# L-80 BTC 2949' 31' 31' 2980' 2900' 2116 cu fl CSIII & 701 cu ft CSII 12-1/4" 9-5/8" 47# L-80 NSCC 9502' 30' 30' 9532' 8787' 1977 cu ft Cl 'G' 8-1/2" 7" 26# L-80 NSCC 632' 9382' 8651' 10014' 9239' 230 cuft Cl 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural RECEIVED Conductor Surface Intermediate ~FC 2~ ~ '~2 Production ~- Liner A/aska OJJ & Gas C0~s. Commission Perforation depth: measured Anchorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid procjram [] Time vs depth pict [] Refraction analysis FI Seabed report[] 20 AAC 25.050 requirementsn 21.1 hereby cerViX( t,.~t th? foregoing is true and correct to the~..~ of my knowledge Signed/"'~. -~ Title Drilling Engineer Supervisor Date /Z__-z-d-~ Commission Use Only Permit Number IAPI number IApproval date ISee cover letter ~'..~-/,~'o~ 150-~?-- Z_2. ~2. /7/ I /,~-c~/'~~ Ifor other requirements Conditions of approval Samples required [] Yes ,~-NO Mud Icg required []Yes ~ No Hydrogen sulfide measures [] Yes .~ No Directional survey requ~recl ~ Yes [] No Required working pressure for BOPE []2M; FI3M; [~5M; FI10M. I-]15M; Other: ~ I T ' Original Signed By by order of Approved by David W. Johnston Commissioner the commission Date//c~---~//~' Form 10-401 Rev. 12-1-85 Submit in triplicate WELL PLAN Well: S-35 Injector (water) [23-26-12-12] PBU s u rface: Target: T.D.: 1645 FNL, 1818' FWL, Sec. 35, T12N, R12E 3608 FNL, 2813' FEL, Sec. 26, T12N, R12E 3519' FNL, 2795' FEL, Sec. 26, T12N, R12E ESTIMATED START: Jan 2, 1993 OPR. DAYS TO COMPLETE: 20(16 days drilling, 4 days completion) ~RACTOR: Nabors 28E MAX ANGLE/SECT COURSE/KOP/BUILD/MAX DEP: 26.1 deg/N11.0E/1500'/2.5&1.5/3470' Estimated Ground level elevation is 35.74' AMSL. KB to ground level elevation is 32'. Item TVD(BKB) MD(BKB) Mud Wt. 20" CONDUCTOR 8 0 8 0 8.5 13-3/8" SHOE 2 9 00 2980 9.1 TOP UGNU SANDS 3 66 7 3834 9.1 SEABEE 5267 561 5 9.8 KUPARUK 6737 7252 10.2-10.5 9-5/8" SHOE 8787 9532 SAG RIVER SANDSTONE 8 78 7 95 32 9.0 - 9.5 TOP SADLEROCHIT 8 9 25 9 74 7 9.0 - 9.5 TARGET 8 9 8 7 9 74 7 9.0- 9.5 TOTAL DEPTH 9 2 3 9 10 01 4 9.0 - 9.5 CASING PROGRAM: HQI~ Csg WI; Grade Conn Lengi;h TQ_D Btm 30" 20" 91.5# H-40 WELD 80 32 1 1 0 16" 13-3/8" 68# L-80 BTC 2949 31 2980 1 2-1/4" 9-5/8" 47# L-80 NSCC 9502 30 9532 8-1/2" 7" 26# L-80 NSOC 632 9382 10014 COMPLETION: Tubing: 5- 1/2" 1 7# L-80 LTC-M 9353 2 9 9382 GLMs: 4 5-1/2" x 1-1/2" with 5 dummies and 1 RP shear(2800 psi) in top GLM Packer: PERM/LATC 9-5/8" x 5-1/2" Baker set at +/- 50' above TOL Isolation Pkr: 7" x 4-1/2" w/ 4-1/2" tail assy w/ X & XN nipples, L-80 LOCKING PROGRAM: Open Hole- Cased Hole 12-1/4" Hole: None 8-1/2" Hole: DIL/GR/SP/SDT, Optional: LDT/GR, RFT Atlas SBT IN 7" AND 9-5/8" before running tubing No gyro is planned. S-351 Conventional 16:27 December 16, 1992 41aska Oil & Gas Co~s. Commission Page 5Anch°rag° PROPOSED DRILLING AND COMPLETION S-351 Procedure PROGRAM 1o MIRU drilling rig. N/U diverter and function test same. . Drill 16" hole to surface casing point. Run and cement surface casing. Nipple up BOPE and function test same to 5000 psi. . PU 12-1/4" BHA and RIH. Test casing to 3500 psi for 30 minutes. Drill 10' of new hole and perform leak off test. 4. Drill intermediate hole to intermediate casing point. . MU and run 9-5/8 casing string and cement as per well plan. Bump cementing plug with mud. 6. RIH and drill 8-1/2" hole through reservoir to TD. 7. RU and run e-line logs. , MU 7" liner on 5" DP. RIH to TD. Cement same. Set liner hanger and packer. Circulate excess cement from wellbore. POOH. 9o MU casing scraper & clean out 7" liner. 10. RU e-line and run cement bond log through liner and bottom of 9-5/8" csg. Set 7" isolation packer on e-line. 11. Run 5-1/2", L-80 and packer assembly with SSSV. Freeze protect with diesel. Test tubing and casing to 3500 psi. 1 2. NU tree and test to 5000 psi. Release drilling rig. ° Anticipated BHP: ° Maximum Anticipated Surface Pressure: ° Planned Completion Fluid: 3590 psi @ 8800' TVD SS 2800 psi 8.6 ppg filtered sea water Notes: a. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.003. b. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/ft). c. Based on previous logs on S Pad, no potential productive zones are anticipated above 3667' TVD (Ugnu). d. No potential hazardous levels of H2S are anticipated in this well. R£C£1vEg · 4laska Oil & Gas Cc',,'~s. Co~il]Jssion Anchorag~ S-35 Conventional Drilling Problems & Concerns: Water Injector ' cEIVED Update: The bond log on S-38 looks good. The liner was reciprocated continuously and the pump rate with cement on the backside was recorded at 10-12 bpm. A copy of the S-pad data sheet has been delivered to 28E. A review of drilling problems has been completed and are described as follows: Bridges in surface hole have occured at 500' and 2000'-2200'. Tight hole and swabbing have been noted. Hole washouts and the related high volume of gravel etc have caused cuttings handling problems. The Tertiary/Cretaceous injection interval (3834' to 5542' md) is overpressured by +/- 125 psi. A mud weight of 9.5 to 9.7 ppg should be used through this interval to prevent salt water incursions. S-33 experienced gas cut mud as shallow as 3841' md/tvd on 10/9/92. The mud weight was cut from 9.6 to 8.9 ppg. No flow was experienced. The mud weight was raised to 9.9 ppg and no additional gas was noted. S-3 experienced gas cut mud in the Kuparuk interval(6700' - 6800' tvd) and 10.5 ppg mud was used. Weight up to 10.2 ppg minimum before drilling Kuparuk interval. Tight hole problems are common in the Jurassic shales starting below the Kuparuk. S-38 experienced tight hole from +/-7000 tvd to 7800 tvd. The mud weight was increased from 10.2 to 10.5 ppg to stabilize hole. The 9-5/8" casing must be centralized through the Kuparuk to maximize isolation(details on cementing page). The Sag has been accidentally penetrated with 9.9 ppg mud weights with no problem. However, S-37 experienced partial lost returns while drilling the Shublik interval with 9.0 ppg mud. LCM was used to successfully slow/stop loss. The possibility of lost circulation does exist. S-15 set intermediate casing with 60' of shale open above the Sag. This hole interval was lost while attempting to drill out with 9.0 ppg mud. There should be no problem if the casing point (Sag River) is properly chosen. The Sag is normally drilled with 9.0-9.5 ppg mud. Lost circulation has been noted, independent of mud Weight.. The Shublik drills slowly and may be highly fractured. High torque and differential sticking are common. The mud weight should be kept at 9.0-9.5 to help minimize the potential for lost circulation. The Sadlerochit is normally drilled without trouble. WASTE FLUIDS The S-37, S-33, S-36, S-38, and S-34 surface annulus is available for waste fluid pumping. Fluids can also be hauled to the central CC-2 injection facility. AOGCC has informed PB Drilling that only associated fluids from drilling operations can be pumped S-351 Conventional 15:38 December 16, 1992 Page 6 down the surface x intermediate annulus-ie' completion fluids cannot be pumped. CUTTINGS DISPOSAL Plan to haul all surface cuttings and surface gravel by cement truck to ball mill at CC-2. Plan to haul all intermediate cuttings by super sucker to ball mill at CC-2. Do not RU cuttings handling unit at rig. FREEZE PROTECTION The 5-1/2" tubing along with the 5-1/2" casing annulus will be freeze protected using gas. The 13-3/8" x 9-5/8" annulus must be fully displaced with dry crude after the well is completed. CLOSE APPROACHS & SHUT-INS There are close approcahes requiring shut-in. Note well proximities on close approach map. S-35 will be nudged at surface. A gyro will be required. RECEIVED Alaska 0il & Ga:, Co~.s. CommL~sio~ Anchora,qe S-351 Conventional 15:38 December 16, 1992 Page 7 MUD PROGRAM: Well S-35 The mud program for this well shall follow the new Mud Policy. The following are the recommended mud parameters. MUD SPECIFICATIONS- SURFACE HOLE Surface: Casing point: Mud Weight: ppg 8.5 - 9.5 8.5 - 9.5 Funnel Viscosity sec/qt -,,300 <1 00 YP Ibs/100ft2 40 - 60 20 - 40 10 sec Gel Ibs/100ft2 30 - 60 15 - 20 10 min Gel Ibs/100ft2 60 - 80 20 - 30 pH - 8.5- 10 8.5- 10 APl Fluid loss mi/30 min 1 5- 2 5 1 5- 2 5 Hardness mg/I < 200 <200 MUD SPECIFICATIONS- INTERMEDIATE HOLE Surface casing shoe to Top of Sag River Sandstone: LSND Gel/Water System Mud Weight ppg Yield Point lbs/1 00ft2 10 sec Gel lbs/1 00ft2 10 min Gel Ibs/100ft2 APl Fluid Loss mi/30 min pH -- Hardness mg/I MUD SPECIFICATIONS-PRODUCTION 9.5-9.8 To to the LCU 10.2-10.5 thru Kuparuk to Casing Point 10 - 15 5-10 10 - 20 <15 through Kuparuk (6800' tvd) <6 in Jurassic Shales below 6800' tvd 8.5 - 10.0 NC-no control RECEIVED Watered back mud system used in intermediate hole. Mud Weight ppg Yield Point lbs/1 00ft2 10 sec Gel lbs/1 00ft2 10 min Gel Ibs/100ft2 APl Fluid loss mi/30 min DH -- Hardness m g/It r 9.0-9.5 8- 13 Alaska Oil & Ga~ Cc,Ts. Commission Anchorage 5-10 7- 15 6.0 - 8.0 (fluid loss lowered to below 6 cc prior to entering K-shales 8.0 - 9.0 < 4000 The mud salinity should be compatible with the Reservoir logging program. The mud should be run at less than 3500 ppm chlorides. S-351 Conventional 15:38 December 16, 1992 Page 8 Prudhoe Prudhoe S-PAD S-35 S-35WP4 Bay Bay Drilling I ISmLTHI I 1©0 VERTICAL VIEW SCALE 1000 F-t, / 9IVISIFIN REFERENCE: WELL HEA9 o --,=~ I000~ 1500~ 2507-- 3668-'' 4000-- 5000-- 5268' 6000-- 7000-- 8000-- 8616 ..... 9000-- 9239 10000 ' 0.00' @ 0 MD R.K.B. 67.75' (ABOVE SEA LEVEL) 0.00' @ 1500 MD KOP @ 2.5/100 BUILD RATE: 2.50 DEG/IO0 FT 5.00' e 1700 MD , i0.00' ~ 1900 MD 11.14' @ 1946 MD BASE OF PERMAFROST  15,00' @ 2100 HD '~ 20.00' @ 2300 MD --~ 25.00' @ 2500 MD 26.07' @ 2543 MD END OF BUILD ° @ 3835 MD UGNU 1584 V. 07' 8 5616 MD TOP DF SEABEE 3221 3471 I I I 1 1000 2000 3000 4000 VEFRTICAL SECT ~'F1N 26.07' e 9343 MD START DF DROP DROP RATE: 1,50 DEG/IO0 FT 23.23' ~ 9532 MD TOP OF SAG/ 9 5/8' CSG. PT, 20.00' 8 9864 MD TARGET 20.00' @ 10014 MD TOTAL DEPTH RECEIVED DEC 2 2 1992 P L A N F-: 1 1 , 0 0 ° Alaska, Oil a Gas Cons. Commission Anchorage ,n[erna[lonai, Inc. I ravelling Cylinder Report Computed by the Sii Win-CADDS System Horizontal Slice Method Date: Page 1 12/1/92 ?EFERENCEWELL: 'rudhoe Bay Drifting ~rudhoe Say ~-PAD ;-35 ;-35WP4 'VD, N/S and E/W are measured from the WELLHEAD ~ettpath Slot Distance sO1 S-01 1063.29 sOlr S-01R 1059.85 sO2 S-02 940.94 sO3 S-03 837.22 sO4 S-04 729.29 sO5 S-05 621.17 sO6 s-06 513.58 s07 S-07 394.81 s08 S-08 291.32 s09 S-09 175.53 sl0 S-10 73.52 sll S-11 31.90 s12 S-12 146.77 s12a S-12A 136.49 s13 S-13 256.43 $14 S-14 360.88 s15 S-15 799.77 $16 S-16 1131.74 s17 S-17 1237.91 s17a S-17A 1237.71 $18 S-18 1292.71 s19 S-19 986.15 320 S-20 892.90 ~21 S-21 806.53 ~22 S-22 1024.16 ~23 S-23 874.25 s24 S-24 631.70 s25 S-25 692.43 326 S-26 657.69 $27 S-27 585.39 ~28 S-28 546.90 ~29 S-29 257.01 230 S-30 436.56 331 S-31 365.59 ~32 S-32 94.76 ~-33mwd S-33 318.08 ~-34IWP S-34 33.29 ~36MIAO S-36 70.16 ;-37NI,D S-37 103.78 ;-38MkO S-38 147.95 ;-38WP S-38 148.49 Closest Points Direction Ref MD Ref TVD 270.89 50.00 50.00 269.45 1700.25 1700.00 270.59 1550.00 1550.00 270.71 1300.00 1300.00 270.65 1300.00 1300.00 270.26 1500.00 1500.00 270.91 0.00 0.00 258.24 1851.38 1850.00 269.56 1550.00 1550.00 268.18 1550.00 1550.00 270.86 100.00 100.00 97.40 500.00 500.00 91.00 50.00 50.00 91.38 0.00 0.00 90.94 100.00 100.00 101.46 2055.42 2050.00 281.79 6542.41 6100.00 281.85 7488.65 6950.00 243.17 50.00 50.00 243.18 50.00 50.00 238.85 0.00 0.00 271.00 200.00 200.00 266.74 1851.38 1850.00 270.86 150.00 150.00 270.86 950.00 950.00 270.80 650.00 650.00 187.01 6041.46 5650.00 271.02 1450.00 1450.00 270.85 800.00 800.00 271.03 1400.00 1400,00 270.80 1350.00 1350.00 270.48 650.00 650.00 270.67 1100.00 1100.00 270.74 900.00 900.00 271.67 1650.11 1650.00 264.04 1800.86 1800.00 248.16 900.00 900.00 90.97 0.00 0.00 91.21 0.00 0.00 270.74 600.00 600.00 270.88 0.00 0.00 RECEIVED Alaska OJJ & Gas Cons. Corr~mission Anchorage Prudhoe , Prudhoe S-PAD S 35 Bay Bay Drilling Cy[inder - Honizonto [ We[ [ - S-35WP St ice Trave[ [ in9 ReFerence TVD: 0- 9a39 Ft. Interval, 50 Ft. A[[ D irectlons Re[ to True Nor th 330 ' lO0 9O 30' 8O 70 300' 60 50 60' 4D 270' S-37MWB ;::)40' 120' 210' 150' Alaska Oil & Gas gorls. Commissior~ Anchorace Prudhoe Prudhoe S-PAD S-35 Bay Bay Drilling TRUE RECEIVED Alaska Oil & 6as Cons. Oornmisg~Of~ Anchorage HORIZONTAL SCALE 5 O0 REFERENCE', VIEW ?t;, / DIVISION WELL HEAD I 8000 _ i1.00 I 7500 _ I~.00. I ;7000 - I,/.00, I 6S00 ~ II.00,  6000 . ~ ~. 00,  ~000 ~ ll. O0,  ~500 ~ I1.00, ~000 ~ l~.O0. 200 300 BO0 500 I000 500 ~ooo 13-3/8" SURFACE CASING CEMENT PROGRAM - BJ Services CASING SIZE: 13-3/8", 68# CIRC. TEMP 38°F LEAD CEMENT TYPE: Cold Set III ADDITIVES: retarder WEIGHT: 12.2 ppg YIELD:1.92 ft3/sx MIX WATER: 10.5 gps APPROX #SACKS: 1102 THICKENING TIME: 4:30 hrs TAIL CEMENT TYPE: Cold Set I! ADDITIVES: as required WEIGHT: 14.9 ppg YIELD: .96 ft3/sx MIX WATER: 3.89 gps. APPROX #SACKS: 480 THICKENING TIME: 4 hrs TOP JOB CEMENT TYPE: Cold Set II ADDITIVES: retarder WEIGHT: 14.9 ppg YIELD:0.96 ft3/sx MIX WATER: 3.89 gps APPROX #SACKS: 250 SPACER: 75 bbls fresh water ahead of lead slurry. CENTRALIZER PLACEMENT: 1. Run one(l) bow type centralizer per joint for the first 20 joints. 2. Place the centralizers in the middle of each joint with a stop collar. 3. Run two bow type centralizers spaced 10" and 20' above conductor shoe 4. Do not run cement baskets. CEMENT VOLUME: 1. Lead slurry to surface w/100% excess. 2. Tail slurry volume 480 sx 3. Top job volume 250 sx. f ECEIVED 41aska Oil & Gas Co~s. Corr~missior, Anchorage S-351 Conventional 15:38 December 16, 1992 Page 13 9-5/8" INTERMEDIATE CASING CEMENT PROGRAM- BJ Services CIRC. TEMP: 130° F SPACER: 50 bbls Arco Spacer, weighted 1 ppg above mud current mud weight. LEAD CEMENT TYPE: CLASS G ADDITIVES: 2.0% A-2 + 0.5% Gel + 0.7% R-18 + 1 ghs FP-6L WEIGHT: 12.0 ppg YIELD: 2.40 ft3/sx MIX WATER: 14.2 gps APPROX #SACKS: 680 THICKENING TIME: 5 hrs TAIL CEMENT TYPE: CLASS G ADDITIVES: .3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1 GHS FP-6L for 3-4 hrs thickening time. WEIGHT: 15.8ppg YIELD: 1.15ft3/sx MIX WATER: 5.00 gps APPROX #SACKS: 300 THICKENING TIME: 4 hrs CENTRALIZER PLACEMENT: 1. 1 turbulator centralizer per joint on shoe joints (2 required) 2. 1 turbolator per joint on every third joint to 500' above shoe(4 required) 3. 1 straight blade rigid centralizer every third joint from 300' below to 300' above Kuparuk (7516' md to 7584'md + 600'= 6 required) 4. 2 turbolators spaced out 100' and 200' above surface shoe (2 required) OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 10-12 bpm. · CEMENT VOLUME: 1. Lead G neat slurry to 500'md above top of Ugnu with no excess. 2. Tail G slurry to 1000' md above casing point with no excess. 3. 80' md 9-5/8", 47# capacity for float joints. NOTE: The intermediate casing string should be isolated from the UaJ~Cretaceous interval. ECEIVED 41aska 0ii & 6as Cor~s. Commissior~ Ancl~ora~e S-351 Conventional 16:01 December 16, 1992 Page 1 7 7" PRODUCTION LINER CEMENT PROGRAM - BJ Services CIRC. TEMP 140° F . Bottom Hole Static Temperature -- 226 degrees F at 8800' SPACER: 75 bbls Arco preflush + 1% S-400 . CEMENT TYPE: CLASS G ADDITIVES: 0.8% BA-10 + 0.6% FL-32 + 0.2% CD-30 + 0.3% A-2 + 0.35% R-1 + 1 ghs FP-6L WEIGHT: 15.7 ppg YIELD:1.18 ft3/sx MIX WATER: 5.03 gps APPROX #SACKS: 195 THICKENING TIME: 4.5 hrs total Note: Ensure that a thickening time test is performed that simulates the shut down time incurred while rotating off of the liner. Note gellation tendencys ( if any ) of slurry when consistometer is re-started after shutdown period - additional retarder may be required - consult w/cementer. CENTRALIZER PLACEMENT: Run 2 turbolators per joint in open hole, 1 per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss should be 40cc or less. Displace @ 8-10 bpm. LINER CEMENT VOLUME: , . Open hole + 150% excess + excess for surface volume lost (adjust if a caliper log is run and it indicates severe washouts). 7", 26# casing capacity below landing collar. 150' liner lap 200' of cement on top of the liner in the 9-5/8" casing. Gas Co~s. Commission Ar~chorage S-351 Conventional 16:13 December 16, 1992 Page 22 S-35 Casing Design SURFACE CASING 13-3/8" 68#/FT K-55 & L-80 BTC CASING BURST COLLAPSE K-55 3450 1950 L-80 5020 2260 PBYS (#) TJYS (#) 1069000 1300000 1556000 1585000 Burst Pressure Calculation Burst rating based on shutting in the well on a gas kick equivalent to the LOT (14.0 ppg) at the surface casing shoe. Worst case will be in the K-55 casing, which has no back up gradient. LOT (ppg) TVD (FT) SIPRESSURE 14 2900 2111 Burst S.F. 1.63 Collapse Calculation Collapse rating based on losing returns until the fluid level is below the surface casing shoe Mud weight behind the surface casing is 9.5 ppg Mud Wt. (ppg) TVD (FT) Collapse press 9.5 2900 1433 Collapse S.F. 1.58 Tension Calculation Based on full string weight in mud Casg Wt. (#/ft) MD (FT) 68 2980 PBYS Tension S.F. 6.1 7 Mud Wt. 9.5 ppg TJYS 7.51 String Wt. (#) 173217 RE( EIVED DEO 2 2 ,992 Alaska Oil & Gas Co~"~s. Commissio~ Anchorage S-35 Casing Design Production Casing 9-5/8", 47#,L-80,NSCC Casing GRADE BURST L-80 6870 COLLAPSE PaYS (#) TJYS (#) 4750 1086000 1161000 Burst Pressure Calculation Burst rating based on have a tubing leak on top of full column of fluid Worst case will be at the surface, which has no back up gradient. SrTP 3420 Burst S.F. 2.01 Collapse Calculation Collapse rating based on annulus being evacuated due to gas lift Mud weight behind the casing is 10.2 ppg Gas Grad. Mud Wt. (ppg) TVD (FT) (psi/ft) Collapse press 10.2 8787 0.1 3782 Collapse S.F. 1.26 Tension Calculation Based on full string weight in mud Casg Wt. (#/ft) MD (FT) 47 9532 PaYS Tension S.Fo 2.87 Mud Wt. 10.2 TJYS 3.07 String Wt. (#) 378160 RECEIVED Alaska Oil & Gas Cons. commission Anchorage S-35 Casing Design PRODUCTION LINER 7", 26#,L-80,NSCC Casing GRADE BURST L-80 7240 COLLAPSE PBYS (#) TJYS (#) 5410 604000 667000 Burst Pressure Calculation Burst rating based on formation pressure on top of 9.7 ppg fluid Fluid wt (ppg) back up (ppg) Burst Pressure SITP 9.7 9.5 351 2 3420 2.06 Burst S.F. Collapse Calculation Collapse rating based on annulus being evacuated due to gas lift Mud weight behind the casing is 10.2 ppg Mud Wt. (ppg) 10.2 Collapse S.F. Gas Grad. TVD (FT) (psi/ft) Collapse Press 9239 0.1 3976 1.36 Tension Calculation Based on full string weight in mud Casg Wt. (#/ft) MD (FT) 26 632 Mud Wt. String Wt. (#) 10.2 13870 Tension S.F. PBYS TJYS 43.55 48.09 . ECE VED Alaska Oil & Ga,~; Cons. Commission Anchorage NABORS 28E 13 5/8" 5,000 psi Stack 2.42 10.93 4.50 4.82 1.51 3.07 2.13 1.13 GROUND LEVEL RKB I KR TQ BF I , RI( HYDRIL PIPE RAM BLIND RAM ~FI O( 1 ].18 5.58 8.06 MUD CROSS PIPE RAM u i i MUD CROSS TBG SPOOL 12.58 I16.25 ASE FLG ~ / 17.33 R['CEIVED Alaska Oil & Gas Cons. 6ommissim~ Anchorage 19.75 NABORS 28E DIVERTER SYSTEM ARCO ALASKA, INC. FILL-UP LINE RISER FLOWUNE I 10" B~ l~ VALVE [ , I I 1(7' BALL VALVE ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. 'I'HE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE IJSE OF THE SECOND VENT MNI=_ THE SECOND VENT UNE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE A~MULATOR. THIS IS THIS IS A VARIANCE FROM 20AAC25.035. RESERVE PIT 10" VENT UNE 10" VENT UNE DIVERTER UNES DISCHARGE 100 FT. FROM RIG IGt,FI1ON SOURCE. ~,, ',J,~,,,:,,:'r,,,,:=~'~'mm. R E C ElY E D Alaska 0ii & 8a~ Cc~'~s. Commissior~ CAVI~M UNIT TO--_~LAREI SHAKER SCREEN CHOKE MANIFOLD TRIP TANK 170 BBL VOLUME TANK 137 BBL FILL LINE .I DIT~ .SXND_.. TRAP 4 BBL 131BBL S1 BBL DEQASSINQ TANK DESILTER NABOR8 CENTR.'UOg PIONEER MI( I DEQA88ER DRILCO 8EEFLOW TO PIT TO STAND PIPE & K[L L~E EQ. VOLUME TANK 180 BBL I TO DISTRIBUTION WATER 87 BRL MUD HOPPERS & MIXING PUMPS SUCTION 117 BBL SUCT~N 134 BBL MUD PUMPS NABORS DRLLING LTD RIG No. 28E MUD SYSTEM SURFACE FACILITIES TOTAL ACTIVE SYSTEM: 800 BBL TOTAL SURFACE CAPACITY : 970 BBL ** CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE DATE [ thru (3) Ad.min [[[~thru ~13] [10 & 13] (4) Casg [14 thru 22] [23 thru 28] Company Lease & Well 1. Is permit fee attached ............................................... 2. Is well to be located in a defined pool .............................. 3. Is well located proper distance from property line ................... 4. Is well located proper distance from other wells ..................... 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated & is wellbore plat included ................... 7. Is operator the only affected party .................................. 8. Can permit be approved before 15-day wait ............................ e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed ..................... , .............. Is lease nt~nber appropriate .......................................... Does well have a unique name & nunber ................................ Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of'drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface $ intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter System required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~ooO psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... YES NO (6) Other /~./~(' thr~'J~P-'u31] [29 (7) Contact ----- (8) Add] 29. 30. 31. 32. 33. FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone n~nber of contact to supply weekly progress data ...... Additional requirements ............................................. geology' DWJ,~ RPC~ rev 12/92 jo/6.011 eng i neer i hq_: MTM ~ RAD_]) I2- 3 ~ LG---~' ~, ~ INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE V REMARKS Additional remarks' UM Exp/Dev Inj MERIDIAh.!: SM ~ TYPE: Redrill Rev . ,, o ~z ~o Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX.' .. No special 'effort has been made to chronologically organize this category of information. Smmmmmmmm~mmmmmmm~mm~mmm~* *mmmmm~m~m~m~mmmmmmm~mm~mmm~ COMPANY NAMK C BP ~XPLORATION FELL '~A~ PRUDHOE BAY BOROUGH I NOR~'H SLOPE API NUMBER : 50029~232400 REFERENCE NO : 93.37'0 RECEIVED ;llla~ka.oii & Gas Coa~. Comrni~tot~ Anchorage ,I$ Ta~e Verification Listing ichlumberger Alaska Computin~ Center 26-JAN-1993 10:07 ~E~L NA~E : g3017 CONTINUATION PREVIOUS RE~L CON~ENT : BP EXPLORATION,PRUDHOE BAY,S-35 I (23-26-12-12)~50-029-22324-00 **** TAPE BEADER **** SERVICE NAME : EDIT DRTF : 93/01/26 O~I~IN : FLIC TAPE NAME : 93037 CONTINUATIO~ # : ~ PREVIOUS TAPE : CO~ENT : BP EXPLORATION,PR!!DHOE BAY,S-35 I PRUDHOE BAY [iNIT WFLL NAME: AP1 NUMBER: OPERATOR: L~GGING COmPAnY: T PE CREAT!ON'DATE~ ~O,B DATA OPERATOR WITNESS: SURFACE LOCATION TOWNSHIP: RANGE: FEL: ELEVATIO~(FT FRO~ ESL O) KELLY BrISlING: DERRICK FLOOR: ~ROUN~ LEVEL: #. WELL CASING RECORD STRING STRING $'35 1 (23'26'12'12) 500292232400 BP EXPLORATION SChLUmBERGER WELL SERVICES 2~-JAN-93 93037 G. ~ARBER HAYWOOD . 35 1645 ! 69,00 [)PEN HOLE CA_SING DRILLERS BIT SIZE (IN) SIZE [IN) DEPTH (FT) ~.500 9. 625 ~ ~0 PAGEI IS Ta~e Ver~.flcatton blstino chlu~berger Alaska Computln~ Center ~6-JAN-1993 10:07 3RD STRING PRODUCTION STRING # RE~aRKS: FIELD ENGINEER'S REMARKS: D!L AND BWC CENTRALIZED WITH 1,5" RUBMER FINNED STANDOFFS, A 2' hOLE FINDER ALSO USED ON THE DIb. $ $ PAGE: **** FILE HEADER **** FIbF NA~M : EDIT .00~ SERVICE : FLIC ~ERSIO~ : O01A07 DATE : ~AX REC SIZE : ~0~4 F!LF TYPE : LO L~ST FILE : FILE HEADER FILE NUMBER: EDITED CURVES ~11 tool strings; Depth sh~ted and cl~pDed curves'; all runs' merged; mo cased hole data. D~PTH INCREMENT 0.5000 f'ILE SU~PARY PB[] TODL CODE START DEPTH STOP DEPTH o9 7.o 9537.0 oo 6.o BASELINE CURVE FOR SHIFTS: GR CURV~ SHIFT DATA (MEASURED DEPTH) _ _ ---------EQUIVALENT UNSHIFTED BASELINE DEPTH BCS DTE SP ~88880 9963~ 9938 9937 9909 9870 9869 9857 9850 9845 9844 98~4 9818 9807 9806 9?87 88888.0 9937.5 g~44.0 9807,0 9787.5 88887 5 ~88'7.5 9963:0 9937.5 9937 5 9909:0 9870.0 9870.0 9858.5 9850.5 983.3,0 98!6,5 9806,5 9844.0 Tape verification Listino chlumberger ~las~a Computlno Center 26-JAN-1993 10:07 977 977 974 974 966 964 963 963 4 0 5 4 0 2 5 9 0 B 5 8 0 3 5 ! 0 0 5 9605 0 9595:5 9590,0 9585'5 9545,5 100.0 MERGED DATA SOURCE PBU TOOL CODE $ 9774.0 9749.0 9787.5 9774.0 9774,0 9748.5 9669,0 9644.~ 9631,5 963~,5 9605.5 9595,0 9586.0 9546.5 I01.0 9749.0 9590.0 100,0 RUN NO, PASS NO, ~ESGE TOP ME~GE BASE I~II~ ImII~III ~IIIl~II~ ~II~I~II RK~RKS{ THE DEPTHG ADJUSTMENTS SHOWN ABOVE REFLECT DT TO GR SFL TO GR(CA~RYING ALL OTBER DTE CURVES)~ SP TO GR[ $ LIS FORMAT DATA PAGE: ** DATA FORHAT SPECIFICATION RECORD ** ** SET TYPEI- 64EB ,m TYPE REPR CUDE VALUE 66 0 ~ 66 0 3 73 ~2 4 66 5 66 6 73 7 65 8 68 0,5 9 65 FT 1! 66 19 12 68 13 66 0 t4 65 FT 15 66 68 16 66 ! 0 66 0 IS T~e Verification Listina chl,~beroer Alasks' Computi~n.. Center 26-JAN-!g93 10~07 PAGE: ** SET TYPE - CHAN ** -;~;~--.--.-----------~.--...-.- .- ~..-.--.. ~; '" ... ~v u~ ~v ~p~ ~ ~;'"'"'" ' ~ ~x r~ ~u.~ ;~'"'""'" - ..... ~B SIZE R ID ORDER # LOG TYPE CLASS MOD NUMB 8A"P EBE~ CODE (HEX) ',','"'"'"'"'"'"'"'"'"'"'"~ s~4~o ooooo ............... oo o ~ '~ ............ , 4'""'"~8 ....... oooooooooo'"'"' DT BC$ US/F 599460 O0 000 O0 0 1 I i 4 68 0000000000 G~ ECS GAPI 599460 O0 000 O0 0 I 1 1 4 68 0000000000 T~NS ECS LB 599460 O0 000 O0 0 I I 1 4 68 0000000000 TF~D ECS LB 599460 O0 000 O0 0 1 ! ~ 4 68 0000000000 IDPH DTE OHMM 599460 O0 000 O0 0 I 1 I 4 68 0000000000 I~PH D~E OH~F 599460 O0 000 O0 0 1 1 ! 4 68 0000000000 ILD DTE OH~ 599460 O0 000 O0 0 1 1 1 4 68 0000000000 IL~ DTE OH~ 599460 O0 000 O0 0 I ! 1 4 68 0000000000 SFL DTE 599460 O0 000 O0 0 I I 1 4 68 0000000000 $P DTE MV 599460 O0 000 O0 0 I ! 1 4 68 0000000000 ~TE~ DTE DEGF 599460 O0 000 O0 0 I 1 1 4 68 0000000000 ~ES DTE OH~M 599460 O0 000 O0 0 1 1 1 4 .68 0000000000 ** DATA DEBT IL~ DTE D~PT II.,~,DTE M~E$,DTE DEPT. TEND'ECS IP~.DTE ~RE$.DTE END,ECS ILM DTE ,DTE DgPT DEBT. ~ ~cs tL~,DT'E' ~RE$,DTE 10024.000 BT.ECS -999,250 GR,BCS -999.250 TENS.ECS 6~8.674 IDPH..DT~.; -999.:250 IMPH,DTE ~999.250 ILD.DTE -999'250 SFL.DTE '999.~50 SP..DTE 999.250 ~TE~.DTE !.127 9:900,000 PT'SCS ~9,138 GR.BCS 19.345 TENS.ECS 577,447 IDPH.DTE 9. ~4 I~P~.DTE 11,967 1SD DTE 11.454 SFL.DTE 35,561 SP,:DTE -137,609 ~TE~DTE 1.135 557:270 IDPH.,DTE 4, 6~ :M :,VTg 026 ILD.DTE · 4,071 SFL,DTE !!'760 SP DTE -96::563 ~TE:~ DYE !. :1 ~ ~" ' 9700,000 PT.Ecs 79.778 GR.BC$ 29,777 7~4.391 IDPH,DT[~ 219 454 I'~PH.DTE 19.:297 !LI).DTE · 8,80! SFL.DT~ 2 ~193 '8P.DTE -93.563 1.155 9600,000 PT*ECS 67:.5I! GR..SCS 53.337 TENS.ECS 748,511 iDPH,DTE 2~,980 I~P~,DTE 26..588 ILD.DTE 22*882 SFL,DTE ~i~,342 SP,DTE -31.500 ~TE~.DTE 1,:!99 5390,000 '999,250 !'78.907 552O 000 2!543 178 907 5365,000 8,854 178.693 5430 000 4: 2 7 2 17 8,133 5490,000 20,001 175,910 5825,000 19,26!' 172o:5!9 Tape Yerificatlo. Listing ;ch]umberger Alaska Computlnd Center DKPT 9537 000 DT.BCS TEND:SCS 707:753 IDP~.DTE ~Lv DTF.. -999.250 SFL DTE .... ,DTE 1.213 END OF DATA 26-JAN-Jg93 10:07 125.200 GR.BCS ~999.250 I,PH.DTE J07.422 TENS.SCS -~99.250 ILD.D~E 31.56~ ~TE~.DTE PAGE: 415.000 -5999.250 169.719 **** F~LE TRAILER FILE NAME : EDIT .001 SERVICE : FLIC VERSION : 001A07 DATE : 93/0!/26 MAX REC SIZE ~ ~024 FIL~ TYPE : LO LAST FILE ***~ FILE HEADER FIL~ NAME : EDIT .002 S~RVICE : FLIC ¥~RSION : OO!A07 DATE : 93/0~/26 MAX REC SIZE : ~024 FILE TYPE : 50 LAST FIL~ NUMBER I 2 EDITED CASEO HOLE MAIN PASS Depth shifted and Cl~pPed curves for open hole logs run into cas~ng, P~SS NUMBE~: 2 DEPTH INCREMENT 0.5000 SUMMARY PBU TOOL CODE START DEPTN STOP DEPTH GRCM 9537.0 8937.0 $ CURV~ SHirT DATA (~ASU~ED D~PTH) PASS NU~BER~ -'----~--EQUIVALENT UNSHIFTED BAS~[.,INE DEPTH · THAT WAS ~[,)N INTO CASING. TF.E, MAIN PASS WAS A IS Tape Verification Listing chlumberger ~laska Computin~ Center 26-jAN-lEg3 10:07 CONTINUOUS PASS INTO CASING NO DEPTH ADJUSTMENTS WERE $ LIS FORMAT DATA PAGE: DATA FO~AT SPECIFICATION RECORD ** ** SET TYPE ' 64EB ** '~''''''''''''''''''''''''~'~'YPE R CODE I 66 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 9 66 42 1~ 13 66 0 14 65 FT 15 66 68  6 66 1 66 ** SET TYPE - CHAN ** .... s E SERV UNIT S~ CE API API AP1 API FILE nB NU~ SIZE REPR PROCES ID ORDER # LOG TYPE CLASS ~OD NUMB SA~P ELEM CODE {HEX) DEPT FT ~99460 00 000 00 0 ~ ! ! 4 68 0000000000 GRCH ECS GAPI 599.460 O0 000 O0 0 2 I 1 4 68 0000000000 TEND ECS LB 599460 O0 000 O0 0 2 1 I 4 68 0000000000 TENS BC$ LB 599460 O0 000 O0 0 2 1 I 4 68 0000000000 ~ES ECS {IMAM 599460 O0 000 O0 0 2 1 I 4 6~ 0000000000 MTE~ ECS DEGF 599460 O0 000 O0 0 ~ ~ I 4 68 0000000000 . ** DATA ** DEPT'Bcs 95~7.ooo t. 2 t 3 ~TE~. 107,422 TEND,ECS 169.7119 707.753 T£N$,BCS 5415'000 IS Tape Verification Listing chlUm.,er~erb Alaska Computing Center DEPT 9500.000 GRCH BCS ~RE$~BCS 1,219 MTE~BCS DEPT. 9400.000 GRCH.BCS MRES,BC$ 1,256 MTEM.BC$ D~PT 9300,000 GRCH.BCS MRES:BCS 1,2~9 MTEM.BCS DEPT. 9200.000 GRCH.BCS MRES,BCS 1,306 MTEM,BCS DEPT, 9100,000 GRCH,BC$ MRE$,BC$ 1,323 MTEM.BC$ DEPT 9000,000 GRCH,BCS MRES~BCS 1.34! ~TEM.BCS DEPT, 8937 000 GRCH.BC$ ~RES,BCS 1:351 MTEM,BCS END OF DATA 26-JAN-1993 10:07 65 556 TEND.ECS !69:482 70,460 TEND,BCS 166.746 52,482 TEND,ECS 163,550 55.854 TEND.ECS 161,211 49 839 TEND.BC$ 156. 2 ' 750.407 726,208 776.989 730.051 77~.077 753,844 772,474 TENS,BCS TENS.BC$ TE~$.BC$ TENS,ECS TENS.ECS TENS.ECS TEN$.BCS PAGE{ 5495,000 5455,000 5495,000 5345,000 5275,000 5145.000 5280,000 **** FILE TRAILER FIL~ NAME : EDIT .o02 ERVICE : FblC ERSION : 001A07 DAT~ : 93/01/26 MAX REC SIZE : !024 F~LE TYPE : LO L~ST FILE FII,~ NA~E : EDIT ,003 8~R. VIC~ : FL:!~O7 ¥~RSION : 001 DAT~ : 93/01/26 FILE TYPE : LO RAW OPEg HOLE ~AIN PASS · Curves and log headerdata for each run and toO1, string in separate Sadlerochit run presented first (primary ~eDth control string' used interval) followed bv flies for other main pass strings Per run,= Ziles; tO depth TOol StriPg #! fo shift the Sad!er :!$ Tape Verification Llstl, ng chlvmberqer Alaska Computimg Center 26-jaN=lq93 10:07 PAGE: TOOL STRING NII~BER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FIL~ SUMMARY VENDOR TOOL CODE START DEPTH G 996 FCS 9989,0 DTE 10016,0 $ LOG HEADE~ DATA DATE LOGGED: SOFTWARK VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP bOG INTERVAL BOTTOM LOG INTERYAL bOGGING SPEED TOOL STRING (TOP TO BOTTOM) V~NDOR TOOL CODE TOOL TYPE TCC GR DTE STOP DEPT~ 9537,0 9537,0 9537,0 20-JAN-93 5C0-423 1130 20-JAN-93 1613 20-JAN-93 ~0020.0 I002~,0 953 .0 9992,0 1880,0 TO0 AUX!LLiARY ~EA~URE~ENTS A~M-AA 724 AIJXILLI.ARY ~EA~UR ME~TSE AME-.AA 724 TELEMETRY CARTRIDGE TCC-B 28! GAM~A RAY SGC-SA 50 BOREHOLE SONIC CART SLC-UA 278 BOREHOLE SONIC 0P S.N ~ SL$-WA 2004 DUAL INDUCTION CART, DIC-EB 379 DUAL INDUCTION SONDE D/S-MB 379 BO .EMOLE AND CA~ING DATA OPEN HOI~,.,BIT 8IZ~ DRILLERS LOGGERS CASING DEPTH (FT)~' 8.500 9533,0 9537,0 LSND 9,30 10,10 3,~70 3,920 2,~10 BOREHOLE CONDITIONS MUD TYPE: N[ID D..,,NSlTY (LB/G): MUD VISCOSITY (S): Mild PH: FLUID bOSS (C3): ~AXI~4Uiq RECORDED TEMPERATURE (DEGF) ~ESISTIV!TY (OHMS!) AT'TEMPERATURE (6EGF): MUD AT ~EASU~ED. TE~.'~PERATURf; (~T) ,UD AT BOTTO, HOLE TEMPERATURE: .OD FILT.ATE AT .UD F!LT,AT~ AT ), MUD CAKE AT (,T): .UD CA~E AT CB,T): 71,0 71,0 71.0 IS Ta~e YerlficatXon Listing cblumberger Alaska Computing Center 26-dAN-1993 10:07 PAGE: NEUTRON TOOL TOOL TYPE (EPITNERMAL OR THERMAL): MATRIX: LIMESTONE ~ATRIX DENSITY: ~.71 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 1.5 REMARKS: OIL AND BHC CENTRALIZED WITH 1,5" RUBBER FINNED STANDOFFS A 2' RUBBER HOLE FINDER ALSO USED ON THE OIL, LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 132 4 66 1 5 66 73 8 68 0 5 11 66 ? 12 68 13 66 0 14 65 FT 15 66 68 !~ 66 1 0 66 ** SET TYPE - CHAN ** -.----.---,---.-.---.-,--.-....-,,, .... ---,-,--.....-.-..........,,,..,,,,..........-.. NA~E SER UNIT SE~V CE AP1 APl P FIL~ NUMB NUmB $ PROCESS ID ORDER # LOG TYPE CLASS MO~ NUmB SAMP ELE~i CODE (HEX) DEPT FT 599460 00 000 O0 0 3 1 1 4 68 0000000000 DT BHC US/F ~99460 O0 000 O0 0 ] 1 I 4 68 0000000000 TT1 BHC [iS 599460 O0 000 O0 0 3 1 I 4 68 0000000000 TT2 B~C US 599460 O0 OOO O0 0 3 I I 4 68 0000000000 TT3 BHC US 599460 O0 000 O0 0 3 I I 4 68 0000000000 TT4 BHC {]S 599460 O0 000 O0 0 ] I I 4 68 O0000000OO SP BHC MV 599460 O0 000 O0 0 ] 1 I 4 68 0000000000 I$ Tape 'Verification Listing cblUmberqer AlasKa Computing Center 26-JAN-~.993 10:07 PAGE: 10 NAME S~RV UNIT SERVIC~ API APl AP! API FILE NUMB NUmB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ''''''';''G" B:C .... GA';;''''''''''''''''''''''''''''''599460 000 O0 0 ] .... ''''''''''''''''''''''''''''''''''''! ! 4 68 00000000 LB 599460 O0 000 O0 0 3 ! ~ 4 68 0000000000 TENS BkC MTE~' BHC ~RES BHC HTEN BHC CIDP DTE !DPH DT~ CX~P DTE I~PN DTE CI5D DTE ILD DTE I~ DTE IDQF DTE I~QF DTE IIRD DTE IiXD DTE I. RM DTE IIX~ DTE SFbU $~ DTE G~ DTE NTE~ M~£S DTE ~TEN DTE DEGF 599460 O0 OHNM 599460 O0 LB 599460 O0 ff~O 599460 O0 OHMN 599460 00 NMHO 599460 O0 OHMN 599460 O0 MMHO 599460 O0 OHMN 599460 O0 M~HO 599460 O0 o.~ ~~o oo 60 O0 599460 O0 ~MHO 599460 O0 MM~O 599460 O0 ~HO 599460 O0 N~HO 599460 O0 OHM~ 599460 O0 ~V 599460 O0 GAPX 599460 O0 LB 599460 00 DEGF 599460 O0 0~ 599460 00 5B 599460 00 000 O0 0 ~ I 1 4 6~ 0000000000 000 O0 0 3 1 ! 4 68 0000000000 000 O0 0 3 I ! 4 68 0000000000 000 O0 0 3 1 1 4 68 0000000000 000 00 0 3 I 1 4 68 O000000000 000 00 0 3 1 1 4 68 O000000000 000 O0 0 3 1 1 4 68 0000000000 000 00 0 3 1 1 4 68 0000000000 000 00 0 3 1 I 4 68 0000000000 000 00 0 3 1 1 4 68 0000000000 000 00 0 3 1 1 4 68 0000000000 ooo ooo~ ~ ~ ~ ~ oooooooooo ooo ooo, ~ , , ~,oooooooooo ooo ooo, , ~ ~ ~ oooooooooo ooo ooo~ , ~ ~ ~ oooooooooo ooo ooo, ~ ~ ~ ~ oooooooooo ooo ooo, ~ ~ ~ ~ oooooooooo ooo ooo, ~ , ~ ~ oooooooooo ooo ooo, , ~ ~ s~ oo ooo ooo, , ~ ~ ~ oooooo°°°°oooo 0000 DEPT ~:~.c cIDP'DTE CILD:DTE iDOF,DTE IIRM,DTE G~.DTE HTEN,DTE ** DATA D~PT, I0.038,000 TT~'B.HC 556,400 T~.S.8.C 2860'~000 C!DP.DTE 541~49~ CILD,DTE 546,014 ~DQF DTE 0'000 IIR~ DTE 482,572 G~ DTE 31,677 HTEN DTE 21619 10000,000 556,400 5520'000 395,467 392.46,3 0:,000 352.477 31 677 6!0 369 DT.B,C 80.000 MTE~,BHC I7:907 IDP~{.DTE ~ 847 15D, TE 1 I~OF'DT~ IIX~'DTE .548 TEN$~DTE 2860,000 DT.BHC ?T4.BHC MT~.BHC IDPH,DTE .ILD.DTE IMOF.DTE IIX~,DTE TENS-OTE TT1.BHC 8P,BHC ~RE$.BHC CI~P DTE CILM DTE IIRD DTE SFLU DTE ~TE~.DTE 80.000 TTI.:BH¢ 398.800 SP'BHC !78,907 2,529 CI~P'DTE 2,548 C!L~,DTE 0,000 'IIRD,DTE ~3,64! SF[~U,DTE 5520.000 ~TE~,DTE ~18.000 TT2.BHC 1.t ? ~TEN.'BHC 524.8~9 I~PH,DTE 524,2 DTE IIXD,DT~ 4,4 8 SP2DT 178,9~7 ~RE$'DTE 30. ~ T~2'~.C IMPH.DTE' 379,314 92~ IIXD,DT~ 907 NRES.DTg 355.600 1,905 1 9O8 -80 0 1,!27 2'850 2,636 61,594 '30,250 1.1~7 ,IS Ta~e Veri~icatio~ Llsti~o ;c~lu~erqer ~!as~a ¢o~puting Center DEPT, TT3,BHC CIDP,DT~ IDOF,DT~ IIR~.DTE CR.DT£ HTE~oDT~ DEPT CIDPoDTE ClbD DTE ID~F~DTE IIRP,DTE GR.DTE D~PT T~NS.BHC CIDP,DTE C{LD,DTE ID~F,DTE IIRM,DTE GR,DTE HTEN.DTE DEP?, ~T~.~C TKNS,BHC CIDPoDTE C!bD,DTE IDOF DTE GR'DTE HTEN'DTE 'DTE TT3'BHc CIDP.DTE C.ILD DTE ID~F DTE IIR~ DTE GR DTE HTEN,DTE ?ENS.BMC CIDP.DTB 9900. 478. 5365, 107. 113. O, 83. 19. 577. 9800, 600, 5430. 228. 233. O, 230, ~5 . 9700. 548, 5490, ~9 704: 9600 480 5825 43 48 43 53 748 9500, '4SOS 47' 49, . ~130, 65' 750, 9400, '452. 5455, 53. 000 OT.BHC 000 TT4.BHC 000 MTEM,BHC 790 IDPH.DTE 257 ILD.DTE 000 IMOF.DTE 348 IIXM.DTE 345 TENS.DTE 447 000 DT.BHC 400 TT4.BHC 000 MTEM.BHC 812 IDPH.DTE 571 ILD.DTE 000 IMQF.DTE 166 IIXM.DTE 237 TENS.DTE 2?0 000 DT.BHC 800 TT4BHC 000 ~TEM:BHC 675 IDPH,DTE 001 ILD.DT~ 000 iMOF..DTE :125 IIX~,D?E 777 TEN$.DTE :391 00D O0 TT~'BHC · .BHC ILD,DTE 000 POF.DTE 643 {IXM.DTE ~7 TENS'DTE DT'BHC 583 IDPff. DTE 702 ILD'DTE 000 !~OF,DTE 177 IIXM'DTE 556 TENS.*DTE 407 26-JAN-Jg93 10:07 69.~00 TTI.B~C 340.~00 SP.BhC 178. 93 ~ES.B~C 9.277 CIMP,DTE 93 400 TT1,BHC 424~600 '$P,BHC 178.133 4'370 CIMP,DTE 4 281 CILM,DTE iS,S16 80 200 76 400 ~75 glO 20 976 !g 608 0.000  ,496 549 .000 BriC MRES,B~C CIMP,DTE CILM.DTE IIRD,DTE SFLU,DTE ~TEM.DTE 69,600 4),400 · 414 0 000 5~2~ 551 000 TT1,BHC SP,BHC PRES,BBC CIMP,DTE CI.b~'DTE II~D,DTE SFLU'DTE MTEM,DTE 67 284 ~69 0 25 549~ 80O o~0 4~ 0 9 00o TTI.BHC SPB~C ~s:~c CIMP.DTE CILM.DTE IIRD,DTE: SFbU,DTE ~TEM,DTE 473.600 -138.250 1.135 84.1 8 ~7.0~2 109.3t6 35,045 178,693 600.400 248.925 245,505 ~94.538 11,485 !78.133 557.600 -93,563 1,155 54.~390 55,943 46.528 28.635 !75.910 476,000 -31,500 1,199 37,93~ 45,92 44,959 37'808 172,519 :449,200 =145.500 ~35:27 44 56 9700 000 169 482 451,600 -!47.625 1.256 -161.492 TT2.BHC GR.BHC HTEN.BHC IMPH.DTE ILM.DTE IIXD.DTE SP.DTE ~RE$.DTE TT2.BMC GR.BMC HTEN.BHC IMPH.DTE ILP.DTE I!XD.DTE SP.DTE MRE~.DTE GR.,BHC MTEN.BHC I~PM.DTE ILM.DTE IIXD.DTE SP,DTE MRE$.DTE TT2 BHC GR'BMC HTEN BBC !LM DTE IIXD DTE 5P ~RE$ DTE T~.BHC HTEN'BHC IMP~,DTE IL~,D?E iIXD,DTE BP.DTE ~RES.DTE TT2.BHC GR,BHC HTEN,BHC IMPM.DTE PAGE: 11 33 800 577.447 ll.~B7 11.369 28.735 -138.250 1,135 422 000 557.270 4.0~7 4,0 3 17,785 '9!,938 1,138 376 000 29 ]77 704 91 18 386 !7 875 - 5,77 336,800 748, !,199 .65'5' 750,4~6 1950,00~ 1950,000 '208'~65 -145,500 i,219 0 726 208 :!.950 000 I$ Tape Verification Listina chlUmberoer AlasKa Computinq Center C]~DF.DTE ILD.DTE ID .DTE IPOF DIE IIRN DTE IIX~:DTE GR.'DTE TENS.DTE MTEN.DTE DEPT. DT.BHC TT3.BHC TT4.BHC TENS BMC MTEM.BHC CIDPiDTE IDPH.DTE CtLD DTE ILD.DTE IDQF DIE IMOF.DTE IIR".DTE IIXM.DTE GR.DTE TENS.DIE HTEN.DTE DEPT. DT.BHC TT].BHC TT4.BHC TENS.BHC MTEP,BMC CIDP.DTE ~DPH.DTE C~bD.DTE IbD.DTE IDOF DTE , IMQ~,DTE IIR~.DTE IIXM,DTE GR.DTE TEN$.DTE HTEN.DTE 'TT3 TENS BHC CXDP DTE CibD DTE DQF DTE GR DT~ MTEN DTE D~PT. C!DP'DTE CILD.DTE IDQF,DTE iIRM,DTE HTEM,DTE D~PT. ~73.~C TE:N$.B~C CIDP'DTE CILD,DTE IDQF.DTE !!R~,DTE G~,DTE MTEN.DTE 54.011 0.000 '159.781 70.460 726.208 9300.000 450.400 5495.000 44.555 46.413 0.000 -124.124 62.482 776.989 9200,0g0 455.6 0 5345,000 49,011 50.675 0,000 -145,123 55,854, 730,051 91 O0 .. 000 396.800 5275.000 51,520 53.!44 0.' 000 -164,004 49,839 7 7 2 · 0 7 7 ,000 0 0 s'4s: Ts 52,783 0,000 "160,779 4 ;533 75 ,844 8936,000 -999'250 5280 000 50 042 50 829 :ooo -II 610 48,229 765,119 DToBHC ~T4.S~C ~TE~.BHC IDPH.DTE IILD,DTE ~OF'DTE IIXM~DTE TEN$,DTE DT'BHC TT4,BHC IDPM'DTE ILD.'DTE I~QF,DTE I~XN,D?E ?EN$,DT~ DT,BHC TT4'BHC IDPH,DTE ILD,DTE IMOF,DTE IIXM,DTE TENS'DIE 26=JAN-1993 1.0:07 18 3101 CIL~. DIE 0:0.0 IIRD,OTE 366 584 SFLU.DTE 5455.'000 MTE~.DTE 69.200 T~4,BHC 287.200 ,sHe 163.550 ~ES.BhC 22.444 CIMP.DTE 21,546 CIL~.DTE 0.000 IIRD.DTE 258.404 SFLU.DTE 5495.000 MTE~.DTE 70.~00 ITl,BBC 286. O0 SP,BHC 2 4 CIPP.DTE 19 733 CI5~,DTE 0.000 IIRD.DTE 56.400 TT BMC 2~2.400 S~J:BBC 159, 49 MRES-BHC. 19,~10 CI~P,DTE. 18 817 CILM,DTE 0i O0 IIRD,DTE 365~54 SFLU.DTE 5~75 000 MIEn'DIE 283; gO 158' 3~ SP,B. MRES,BHC !9. CIMP.'DTE O' O0 II~D,DTE 343'~43 SFLU,DTE 5~45.600 ~TEM,DTE 58,800 TTI,BHC '999,250 SP'BHC 156,876 MRES,BHC ,983 19 IMP,.TE 19.674 IbM,DIE 0.000 IIRD.DTE 5~0~,859 SFLU.DTE -165 681 XL~..DTE 49:232 IIXD.DTE 9700.000 SP.DTE 166.746 ~RES.DTE  94.000 TT2.BHC .28 HTEN.BHC 124,071 XMPH.DTE -129,04! IL~.DTE 41.911 XXXD.DTE 9700.000 SP.DTE 163,550 PRE$.DTE 396,000 TT2.BHC ]15~.06] GP.BHC 306 HTE~.BHC 14:321 IPP..DTE -150 641 IL~4.DTE 45 517 IIXD.DTE 9700 000 SP.DTE '400 TT2,BHC 1.323 ffTEN.BHC -166,633 IMPH..DTE .007 IbM.DIE -1~ '832 IIXD.DTE 970~,000 SP,DTE 15 '249 MRES.DTE -166 47 .B~C I~PH.DTE IIXD,DTE 000 SP*DTE 139 ~ES.D~E =999 -154 1 -!55 -155 45 9700 !56 PAGE~ 12 1950.000 '260,199 '147.625 1,256 280 400 ~2~482 ?76.989 1950'000 ~950.000 176.831 -149.500 1.289 282 000 0.051 1950.000 !950,000 207.919 '158,06~ 1,306 280,800 49,839 772,077 19:50.000 1950 000 -237 200 -156 56~ ! 32 75:3,844 1950 O0 -I~ 41 GR'BHC .48, .350 HTEN BHC '765'i19 625 INPH;DTE 1950,000 28~ !bM,DIE !950,000 ,18' IIXD.DTE :212,425 37 000 SP,DTE 154' 5 876 M"ES.DTE 1; 350 ,I$ Tape VerJ, f1¢ation Listing ,¢>lumberger AiasKa Computing Center 26-dAN-1993 10:07 PAGE: 1] ** END ~F DATA ** **** FILE TRAILER **** FILE NA~E ~ EDIT ,00] VERSION DATE I 9]/01/26 MAX REC SIZE : 1024 FILE TYPE : LO bAST FILE **** FILM HEADER **** FILE NAME : EDIT ,004 $~RVICE : FLIC V,,RSION ~ 00!A07 DATE : 9~/01./26 MAX REC SIZE : 1 24 FILE TYPE : LD F!~ HEADER FILE NUMBER 4 RAW OPEN HOLE REPEAT PASSES CurVes adc] ~oQ Leader data ~or each Das[, tool ~t~n~, and r~n ~D [eDa~ate ~les, TOOL STRING NUMBERI ~EPTH: INCREMENT1 0.5000 # FILM SUMMARY VMNDOR TOOL CODE START DEPTH ~'~'''''''''''''' ';';~:;''''9 BCS 9~89.0 UTE !0016.0 $ bOG HEAD~R DATA DATE bOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER CFT), TO LOGGERCFT)~ TOP LOG INTERVAL BOTTO~ LOG INTERVAL (FT)~ LOGGING SPEED (FPHR): sTOp DEPTH · ¢~ '0 95~7,0 5C0'423 !130 O:JAN-93 1613, 0 JAN-93 10020.0 10022,0 9537.0 I~0,0 IS TaOe Verification Listi. mq chiumberqer Alaska Computlnq Center 26=jAN-1993 tO:07 14 TOOL 5TRTNG (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TCC GR DTE DTE TOOL NUMBER AUXXLLIARY ~EASUREPENTS AM~-AA 724 AUXILLIARY ~EASURE~ENTS AME-AA 724 TELEMETRY CART~IDG~ GAM~A RAY 80REMOLE SONIC CART, BOREHOLE SONIC SONDE DUAL INDUC~IO~ CART DUAL INDUCTIO~ SOND~ TCC-B 28! SGC=$A 50 SLC-UA 278 SLS-hA 2004 DIC=EB 379 DIS-MB 379 POREHObE AND CASING DATA OPE)l HOLE BIT SIZE (IN) 8 ~00 BOREHOLE CONDITIONS MUD TYPEI LSND ~ID DENSITY (LB/G): 9.30 MUD VISCOSITY (S)I 39,00 MUD Pft: 10,10 FLDID LOSS (C3): 5"80 ~AXIMUM RECORDED TK~PERATURE (DEGF): 17 RESISTIVITY (OH~) AT TEMPERATURE (DEGF): ~UD AT MEASURED T~MPERATURE (MT): ~,870 71.0 MUD AT BOTTOH ~OLE TEMPERATURE ~UD FILTRATE AT (~T), 3.920 7,.0 ~UD FILTRATE AT ~UDCA gE AT (~T): 2.7.10 71.0 ~UD CAKE AT NEUTRON TOOb TOOL TYPE (EPITHER~AL OR THE~AL)I MAT~I×: LIMESTONE MATRIX DENSITY: 2,71 HOLE CORRECTION TOOL STANDOFF fiN): 1,5 ~EMARKSI DIL AND BMC C~NTRALIZED ~ITH ~,5" RUBBER FIN{~E~ STANDOFFS A 2 RUBBER ~ObE FINDER ALSO USED ON THE OIL, #. bis FORMAT DATA IS Tape Verification Listing chlumbergerA. laska Compt~ting Center 26-JAN-!993 10:07 PAGES ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** -Y_ E R C[}DE LUE I 66 0 ~ 66 0 3 73 128 4 66 1 5 66 6 ~ 65 8 68 0 5 66 ~ 66 0 14 65 FT i5 66 68 16 66 0 66 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 API APi IPI FILEi NUMB NUMB SIZE REPR PROCESS .ID ORDER #, bOG TYPE CbA S MOD NUNB SAMP ESEg CODE (HEX) · DEPT FT 599460 O0 000 O0 0 4 1 ! OT BHE US/F 599460 O0 000 O0 0 4 1 1 TTi BHR US 599460 O0 000 O0 0 4 TT2 BMR US 599460 O0 000 O0 0 4 TT3 BMR US 599460 00 000 O0 0 4 TT4 BMR US 599460 00 000 00 0 4 SP BMR ~V 599460 O0 000 O0 0 4 1 GR BMR GAPI 599460 OO 000 O0 0 4 ! ~ENS BMR bB 599460 O0 000 O0 0 4 MTEM BMR DEGF 599460 O0 000 O0 0 4 1 MRES BMR OHMM 599460 O0 000 O0 0 4 ] .t HTE. N BHR LB 599460 O0 000 O0 0 4 1 CIDP DTR MMHO 599460 O0 OOO O0 0 4 IDPH DTR OHMM 599460 O0 000 O0 0 4 1 l CIMP DTR M~H[.} 599460 O0 000 O0 0 4 XMPH DTR OHMM 599460 O0 000' O0 0 4 CILD DTR MMHO 599460 00 000 O0 0 4 ILD DTR OHMM 599460' O0 000 O0 0 4 CIL~ DTR MMHO 599460 O0 000 O0 0 4 ILM DTR OHMM 599460 00 000 00 0 4 IDOF DTR 599460 O0 000 O0 0 4 IMOF DTR 599460 O0 000 O0 0 4 lIED DTR M~H0 599460 O0 000 O0 0 4 I!XD DTR ~MHO 599460 O0 000 O0 0 4 IlR~ DTR ~HO 599460 O0 000 O0 0 4 IIX~ DTR ~HO 599460 O0 000 O0 0 4 4 68 0000000000 4 68 0000000000 ,4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 C000000000 4 68 O000000000 4 68 0000000.000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 O000000000 4 68 0000000000 4 68 0000000000 15 IS Tape Verification Listing chlumberqer Alaska ComPutlng Center 26-JAN-1993 10:07 PAGEs 16 NA SERV , IT SER¥ICf API API API FILE NUmB N SIZE REPR PRUCES$ ID ORDER # LOG TYPE CLASS ,OD NUmB 6A,P ELEM CODE (REX) '~F:~'~"''"~;;~"T, 599460 ..... """""'"'''"'"''"'"'''"'"'""0 000 O0 0 4 1 1 . .... ''68 .... ~';'"";"0 00000 G~ DT~ GAPI 599460 O0 000 O0 0 4 ! 1 4 68 0000000000 T~NS DTR LB 599460 O0 000 O0 0 4 1 I 4 68 0000000000 ~TE~ DTR DEGF 599460 O0 000 O0 0 4 ~ 1 4 61 0000000000 ~E$ DTR OHNN 599460 O0 006 O0 0 4 ! 1 4 68 0000000000 HTE~ DTR LB 599460 O0 000 O0 0 4 1 1 4 68 0000000000 DEPT 10040.000 DT.BMR TT3 ~ BMR 556.800 TT4.BHR T~JNS.BHR 2740.000 ~TE..BHR Cl,D~P-DTR 5]8.234 IDP~,DT~ C~~.~: DTR 545,73.4 .ILP, DTR IDOF.DTR 0.000 IMOF. DT'~ IIR~.DTR 482.234 IIX~.OTR CIDP.DT~ ]93 72 IDPH,DTR CILD.DTR 392,989 ILD.DTR IDOF.DTR 0,000 t~QF.DTR IIR".DTR 327,458 IIX~,.DTR TENS'DTR 55~0,000 MTEM.DTR DEPT. 9900,000 DT.BMR TT3,BNR 474,200 TT4.'BHR TENS.B~R 5335.000 MTEM'BMR ! D P ~, O T R CIDP'DTR '922 CILD'DTR ~11 16,93B ILD*DTR ID~F,~TR 0,000 I~0F'DTR II~ DTR 88'8~0 IIX~,DTR T~.NS DTR 5335,000 ~TEM,DTR DEPT' 98~,000 DT.BHR TT3'BHR 6 ~000 TT4'BMR TENS'BMR 5~20,000 ~TEM,BHR CIDP,DTR ~5'~66 IDPH,DTR CILD.DTR ~30,257 ILD DTR IDOF.DTR 0'000 I~OF DTR llRM'DTR ~25,750 IIXM DTR TENS' DTR 5520,000 MTE~ DTR DEPT 9700,000 DT.BHR TT3:BHP 523' O0 TT4,BMR TENS.BMR 5370,~00 ~TEM,B~R CIDP,DTR 45.647 IDPH.DTR 80, O0 175,2 8 O. O0 80 175 248 ~.543 ~'545 0,000 25.61! 175.248 70'~00 341.200 ~74.963 9' 174. 3 93-700 422~400 174'299 4.439 .000 ~.455 ~74,299 79 ;700 TTI,BHR SP,BHR ~RES'BHR CI~P,DTR CILM,DTR IIRD,DTR SFLU.DTR ~RES.DTR TTI'BHR SP..B~R ~RE$,BHR CIMP,DTR CILM,DTR I'IRD-OTR ~FLU,DTR MRE$'~DTR TTI,BMR 8P,BH:R ~Rf:$,BHR CIMP,DTR ClL~,OTR IIRD'DTR SFLU.'DTR ~RE$,DTR TTI,BHR SP,:BHR MRE$.,:BHR CINP~DTR CILM,OTR IIRD,DTR ~RES,~R CI~P,DTR 18.400 ~80.000 1,1t9 524,427 523,853 432,516 4.494 1.:139 ~18,400 40,3!3 1,:139 363.398 3.51.752 329.761 4.094 47~,800 -14~.6~5 ,168 87, ~g g3, iii 46 !'!68 · 6:07 lO0 2~3'560 13,::121 1'152 .51B,400 .iO0,O00 1,:178 45.:170 TT2.BH~ GP.BHR HTE~.BHR IMPH.DTR IL~.DTR IIXP.DTR GR.DTR HTEN.DTR TT2BHR GR:BHR HTEN.BHR IMPH.DTR IL~,:DTR IIXD,DTR GR.DTR MTEN.DTR TT2,BHR GR,BH~ HTEN.BHR IMPH'DTR ILM.DTR IIXD,D?R GR~DTR HTEN.DTR TT2-BHR GR,B. HR HTENBHE ILM.DTR IIXD.DTR GR.DTR HTEN,DTR HTEN.BMR IMPH.DTR 355,600 '21~'967 1.909 84.145 320 3~0 61B'5~ 2'843 58.195 5,320 618'522 336,800 18.624 il,400 10'664 24'36% .1B.62.4 550;~35 ,, 4't54 14"609 24-~53 543'4.! 28, 8B 657,690 22'139 Tame Verification Listing chlumberoer ~laska Computinq Center CXk~ DTR 49,236 ILD.DTR ID..~DTR 0.000 IMQF.DTR IIRM.DTR 48.672 IIXM DTR TENS.DTR 5370.000 MTEM:DTR DEPT 9600,000 DT.BHR TT3:BHR 474.000 TT4 BMR TFNS.BHR 5895.000 MTEM:BH~ CIDP.DTR 44.4tl IDPH.DTR C)LD.DTR 50,000 ILD.DTR IDOF DTR 0000 IIRM:DTR 43:512 IIXM.DTR TENS.DTR 5895.000 MTEM.DTR . TT3:BHR 395800 TT4:~ TEN$."HR 5505.000 CIDP,DTR 57,194 IDPH"DTR TEN;:DTR ;505:000 MTEN:DTR DEPT. 9467'000 DT,BHR TT3,BHR '999,250 TT4.BHR TEN~,BHR 5320'000 NTEM,BNR C~DP.DTR 57'!94 IDPH.DTR cILD.DTR 44'395 IbD.,DTR IDQ~ DTR 0'000 IMOF,DTR I~R~:DTR -142,186 !I.XN,DTR TENS.DTR 5320.000 MTEM.DTR END OF DATA F~L~ NAME : EDIT .004 $~RVICE : F~IC VERSION : O0~A07 DATE ) 93/0~/~6 MAX REC SIZE : 1024 FIL~ TYPE ~ LO 26-JAN-1993 10:07 20.310 CXLM.DTR 0.000 IIRD.DTR 3.329 SFLU,DTR 172.451 ~RE$.OTR 68.900 TT1.BHR  36.000 SP.~HR .69,788 ~RES.BHR .517 CIFP.DTR i .000 CILM.DTR 0.000 IIRD.DTR 3.724 SFLU.DTR ]69.788 ~RES.DTR 40.~60 TT1.0HR 283. GO SP,BHR 167.555 MRES.BHR 17.484 CIMP.DTR 0,0 IIRD,DTR 258 MRE$,DTR 56 200 -999 250 167 131 484 0,0~0  69,0~0 67.13:1 TTi,BHR SP.BHR CI~P,DTR I]RD.DTR SFLU'DTR' ~ES.,DTR 1.237 ~5.!14 3~.291 .178 47360O -36 125 1 212 39570 45 788 45 36 83 1.212 -149. -122, 1 -135.996 44,497 9700,000 1.233 -999,~50 '148.938 . t'242' 122.991 -12B.295 :437 97~'!!000242 IL~.DTR IIXD,DTR GR.DTR HTEN.DTR TT2,BHR HTEN.BHR IMPH.DTR ILM.DTR IIXD.DTR GR.DTR HTEN,DTR TT2,BHR GR.BHR HTEN.BHR XMPH.DTR ILM DTR DTR HTEN.DTR TT2.BHR GR,BHR HTEN.BHR I~PH.DTR IL~.DTR I'IXD,DTR GR-DTR 19.517 4.659 28.588 657.690 330.800 52-441 699i579 25 272 21.840 2,577 52.441 699,579 280.400 65.580 720 738 19501000 1950 000 -206 909 720. . -999,~50 60, 68 681,089 1950,000 1950.000 -186,177 60,968 68!,089 I$ Tape verification Listing chlumbergerAlasKa Computing Center 26-jAN-!gq3 I0~07 PAGE: 18 **** 'rAPE TRAILER SERVICE NAME : EDIT DATE : 93101126 ORIGIN : FLIC TAPE NAME : q3037 CONTINUATION # ~ ! PREVIOUS TAP~ CO~WENT I BP EXPLORATION,PRUDHOg BAY,S-]5 ! (23-26-12-12),50-029-22324-00 **** REEL TRAILER **** SEPvICE NAME : EDIT DATE : g3/01/26 ORIGIN : FbIC REEL MA~E : 93037 CONTINUATION # ~ PREVIOUS REEL ; COMMENT : BP EXPLORATION,PRUDHOE BAY,S-35 I (23-26-12-12),50-029-2~324-00