Well Job# Loa DescriDtion Date BL Color CD
15·12A 112114",u 11't;:J ",RAVEL PACK 06/25/06 1
17.08 11211509 INJI:\; IluN PROFILE Oti/,,4/u6 1
P2-11A 11221564 JEWELRY/STATIC SURVEY 04/27/06 1
13.o6A 11217266 INJECTION PROFILE 07/12/06 1
P2.o1 11223106 STATIC PRESSURE/JEWELRY 03/25/06 1
L5.o8 11217256 PROD PROFILE W/GHOST & DEFT 06/06/06 1
16.o4A 11217245 PROD PROFILE W/DEFT 05/08/06 1
05-40 11223123 LDL 07/07/06 1
17.09 11211412 PROD PROFILE W/DEFT & GHOST 06/26/06 1
MPC.o7 N/A SENSA/MEMORY GLS 04/22/06 1
04-18 1121584 USIT 06/27/06 1
u-51 11212873 USIT 06/28/06 1
04-31 11217264 USIT 07/07/06 1
D-14A 11217265 USIT 07/09/06 1
PSI.o7 10703937 MDT 10/13/03 1
02·16B 11209601 MCNL 04/25/06 1 1
L2-18A 11217234 MCNL 04/06/06 1 1
L5-09 11212847 MCNL 04/25/06 1 1
Z-26A 11216205 MCNL 07/05/06 1 1
12.01 11072866 RST 07/06/05 1 1
E-17A 10928602 MCNL (Prints sent 1/24/05) 10/30/04 1
;~(;"~'~¡\'EÜ
~.' ....'" ..,,'
') I? ?mH~
(0 .~~ .....,..¿
Sc~lunIbel'ger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
¡Cl9- I:) I
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
07/19/06
NO. 3880
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
e
e
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
oN OR BEFO
STATE OF ALASKA
ALASKA' '-'&ND GAS CONSERVATION CC 'SSION
REPORT SUNDRY WELL OPF_.r ATIONS
Operations performed:
Operation shutdown Stimulate X Plugging Per/orate
Pull tubing Alter casing Repair well Other
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
5. Type of Well
Development
Exploratory
Stratigraphic
Service
4. Location of well at surface
1656' SNL, 1078' EWL, Sec. 24, T10N, R15E, UM
At top of productive interval
2129' NSL, 4348' WEL, Sec. 18, T1 ON, R16E, UM
At effective depth
At total depth
2493' NSL, 4265' WEL, Sec. 18, T10N, R16E, UM
6. Datum of elevation(DF or KB)
72' RKB feet
7. Unit or Property
Prudhoe Bay Unit
8. Well number
16-04A
9. Permit number/approval number
92-151
10. APl number
50 - 029-20561-01
11. Field/Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
12383 feet
9185 feet
Plugs(measured) PBTD Tagged @ 12237' MD (5/19/95)
Effective depth: measured 12237 feet
true vertical 9098 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 100' 20" 345 Sx AS II 100' 100'
Surface 2551' 13-3/8" 2700 Sx Fondu & 400 Sx PF 2623' 2623'
Production 10185' 9-5/8" 500 Sx CL G 10257' 7884'
Liner 2333' 7" 477 Cu ft CL G 10050-12383' 7740-9188'
Perforation depth: measured 11954-11974'; 11982-12000' i ~...' ',. -- '"'
true vertical 8929-8941'; 8946-8957' ',...~.'";
;' '. ~ .:
Tubing (size, grade, and measured depth) 4-1/2", 12.6¢, 13 Cr-80 ~ 11626' MD; 3-1/2", 9.2¢, 13 Cr-80 w/tail 8 11685'
MD
Packers and SSSV (~pe and measured depth) 9-5/8" X 4-1/2" Baker SAB-3 pkr 8 9980' MD; 7"x 4-1/2" Baker SABL-3 pkr Q 11622' MD;
4-1/2" Camco TRDP-4A SSSV Q 2175' MD
13. Stimulation or cement squeeze summary
Intervals treated(measured) See Attached
Treatment description including volumes used and final pressure
14.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 166 49 225 - 239
Subsequent to operation
245 147 2O6 245
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil x Gas Suspended
Service
i7. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~'-'-~'~'-~ ~ Title Engineering Supervisor
Form 10-40(¢_.~ev 06/15/88
Date / /
SUBMIT IN DUPLICATE
KRF cc: KZ. JWP
16-04A
DESCRIPTION OF WORK COMPLETED
HIGH ENERGY ROPE STIMULATION TREATMENT
5/1 9/95'
RIH & tagged PBTD at 12237' MD.
5/23/95'
MIRU CTU & PT equipment.
intervals located at:
RIH w/CT & jetted a Hot Oil Treatment across the open perforation
11954 - 11974' MD (Z3)
11982 - 12000' MD (Z3)
Ref. Log: BHCS 2/13/93.
Jetted 260 bbls Hot Crude tubing wash, followed by 45 bbls 50% Diesel/50% Xylene & 83 bbls
Diesel across the perforations. Squeezed 15 bbls Diesel/Xylene behind pipe. POOH w/CT. RD.
5/26/95 ·
MIRU & pumped 450 Mscf of Nitrogen to displace wellbore fluids to 11600' MD, in preparation
for ROPE treatment. RIH & set a shear disc in the 3-1/2" tubing tail at 11639' MD. RD.
5/29/95-
Performed a High Energy ROPE Stimulation on the open perforations (listed above).
MIRU & PT equipment. Pumped 293 Mscf of Nitrogen & ruptured the shear disk at 8290 psi.
Rigged down.
5/3O/95'
RIH & retrieved the ruptured shear disk assembly.
Returned the well to production w/gaslift & obtained a valid production rate.
GeoQuest
500 w. International Airport Road
ATTN: Sherrie ;( i...
NO. 9264
Company:
2/22/95
Alaska Oil & Gas Cons Comm
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
~ fi '4 -/5-5-
AJ~ 0tl & L~a~ L;0dS, i;ommJssJ~l Field' Prudhoe Bay
~,j]~rag. e Floppy
Well Job # Log Description Date BL RF Sepia Mylar Disk
D.S. 1-25 PATCH SETnNG RECORD 020495 I 1
D.S. 1-22A DUAL BURSTTDT-P 020395 I 1
D.S. 11-11 PERF RECORD 020395 1 1
D.S. 9-38 INJEC PROFILE 020495 I 1
D.S. 9-45 DUAL BURSTTDT-P 020595 I 1
D.S. 9-45 RST 020495 I 1
D.S. 9-51 PROD PROFILE 020595 I 1
D.S. 16-4A RST 020295 I 1
,,DIS. 18-14 TUBING cUTTER RECORD 020595 I 1
D.S. 5-26 PROD PROFILE 020695 I 1
D.S. 5-28 PROD PROFILE 020695 I 1
D.S. 6-10 DUAL BURSTTDT-P 020795 I 1
D.S. 9-8 PERF RECORD 020695 I 1
D.S. 11-16 PERF RECORD 020395; 1 1
D.S. 14-34 PERF RECORD 020795: I 1
, ,
"~' ~/- I/0
-,. 7~.. 7g-
'~
SIGNED:
DATE:
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
DESCRIPTION OF WORK COMPLETED
CEMENT PLUGBACK FOR WATER SHUT OFF
10/16/94'
RIH & tagged PBTD at 10132' MD.
10/17/94'
RIH w/video camera & displaced Crude from the wellbore w/Seawater.
liner at 10055' MD. POOH w/camera. Rigged down.
Viewed a large hole in the 7"
12/11/94:
A Cement Plugback to isolate the liner hole for Water Shutoff, was performed as follows:
MIRU CTU & PT equipment to 4000 psi. Loaded the wellbore w/Seawater, then RIH w/CT to tag bottom
& spotted 4 bbls of Latex Acid Resistive cement in the liner from 10132' to 10024' MD. POOH w/CT
spotting biozan across the perforations located above 10024' MD. Left cement below 10024' MD. RD.
-.
12113194'
RIH & tagged the top of the cement plug at 10060' MD.
12/20/94'
MIRU CTU & PT equipment to 4000 psi. Loaded the wellbore w/Seawater & Crude, then RIH w/CT dump
bailer to dump I bbl of Latex Acid Resistive cement on the cement plug from 10060' to 10033' MD.
POOH w/CT spotting biozan across the perforations located above 10024' MD. Rigged down.
I 2/22/94'
RIH & tagged the top of the cement plug at 10049' MD.
Returned the well to production w/gas lift & obtained a valid production test.
RECEIVED
JAN. 2 4. '1995
~i~sha 0il & Cas Cons. C0ramissi0n
Anchor:
PERMIT
AOGCC Individual Well
Geological Materials Inventory
DATA T DATA_PLUS
Page'
Date: 01/09/95
RUN DATE_RECVD
92-151
92-151
92-151
92-151
92-151
92-151
92-151
92-151
92-151
92-151
5561
SURVEY
SURVEY
DWOP ~'~
T 10193-12380 DLL/MLL/AC/GR
R 10250-11382 ANADRILL
R 10250-11382 ANADRILL
407~..~
SSTVD~---- L 10020-12380
PROD/SPIN/TEMP~-- L 11850-12295
R 02/03-03/03/93
R COMP DATE'03/09/93
L 11690-11855
PRESS/TEMP~---
PERF/GR/CCL~--~
PERF----
L 11500-12302
L 11494-12250
92-151 PERF~--- L 11800-12278 1
L 10020-12380
92-151
92-151
DLL/MLL/GR~'~
BHCA/GR~---~
L 10020-12380
03/19/93
08/31/93
04/23/93
04/23/93
04/23/93
01/14/94
07/30/93
04/27/93
03/26/93
04/27/94
04/27/93
03/09/93
03/09/93
yes ~And received?
Are dry ditch samples required?
Was the well cored? yes no Analysis & description received?
Received?
Are well tests required?il yes
Well is in compliance i2itia1.~-~
COMMENTS
yes
yes
no
.._ STATE OF ALASKA ..
ALASKA _AND GAS CONSERVATION CC AISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
Operation shutdown Stimulate X Plugging Perforate X
Pull tubing Alter casing Repairwell Other X
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
1656' SNL, 1078' EWL, Sec. 24, T10N, R15E, UM
5. Type of Well
Development
Exploratory
Stratigraphic
Service
X
6. Datum of elevation(DF or KB)
72' RKB
7. Unit or Property
Prudhoe Bay Unit
8. Well number
16-04A
At top of productive interval
2129' NSL, 4348' WEL, Sec. 18, T10N, R16E, UM
At effective depth
At total depth
2493' NSL, 4265' WEL, Sec. 18, T10N, R16E, UM
JUL 1 1994
Oil & Gas Cons. Commission
feet
9. Permit number/approval number
92-151
10. APl number
50 - 029-20561-01
11. Field/Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured 12383 feet Plugs(measured) Sand Plug @ 12049' MD (6/10/94)
true vertical 9185 feet
Effective depth: measured 12049 feet 0 IOiNAL
true vertical 8986 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 100' 20" 345 sx AS II 100' 100'
Surface 2551' 13-3/8" 2700 sx Fondu & 400 sx PF 2623' 2623'
Production 10185' 9-5/8" 500 sx CL G 10257' 7884'
Liner 2333' 7" 477 cu ft CL G 10050-12383' 7740-9188'
Perforation depth: measured 11954-11974'; 11982-12000'
true vertical 8929-8941'; 8946-8957'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13 Cr-80 @ 11626' MD; 4-1/2" x 3-1/2" xover @ 11626' MD;
3-1/2", 9.2#, 13 Cr-80 w/tail @ 11685' MD
Packers and SSSV (type and measured depth) 9-5/8" X 4-1/2" Baker SAB-3 pkr @ 9980' MD; 7" x 4-1/2" Baker SABL-3 pkr @ 11622' MD;
4-1/2" Camco TRDP-4A SSSV @ 2175' MD
13. Stimulation or cement squeeze summary
Intervals treated(measured) See Attached
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Injection Data
Oii-Bbl Gas-Md Water-Bbl Casing Pressure
Prior to well operation 86 594 3022 --
Subsequent to operation 700 598 1020 --
Tubing Pressure
303
299
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil x Gas Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed(~A~ 0~. ~~-0-/'- ~I';/..,~.z~cc,~y Title
Form 10-404 Rev 06/15/88 /
1136/10 GSS/KRF cc: JED, JWP
Engineering Supervisor
Date y ¢/¢~',
SUBMIT IN DUPLICATE~
16-04A
DESCRIPTION OF WORK COMPLETED
CTU CEMENT SQUEEZE FOR WSO & PERF BREAKDOWN / ACID STIMULATION
1/17/94'
RIH & tagged PBTD at 12286' MD.
2/24/94 ·
MIRU CTU & PT equipment to 4000 psi.
reciprocated a Pre Squeeze Acid Wash across the open perforations at:
11954' - 11974' MD (Z3)
11982' - 12000' MD (Z3)
12124' - 12136' MD (Z2)
12144' - 12150' MD (Z2)
12174' - 12182' MD (Z2)
Pumped 50 bbls 15% HCI
Loaded the wellbore w/Seawater, then RIH w/CT &
Ref. Log: BHCS 2/19/93.
w/10% Xylene @ 1.9 bpm, followed by 214 bbls 1% KCI Water
displacement. Continued pumping 25 bbls of Superfine Cement, followed by 25 bbls Latex Acid
Resistive Cement, to squeeze the perforations (listed above). Attained 3500 psi maximum squeeze
pressure & held for one hour. Placed 2 bbls of cement behind pipe. Contaminated cement w/biozan
& jetted contaminated cement from the wellbore down to 12276' MD. POOH w/CT. Rigged down.
2/27/94 ·
RIH & tagged cement at 11595' MD.
3/12/94'
RIH w/CT mounted milling assembly & milled out cement from 11558' MD to 12303' MD.
RD.
3/15/94'
Reperforated'
11954' - 11974' MD (Z3) Ref. Log: BHCS 2/19/93.
11982' - 12000' MD (Z3)
6/5/94 ·
RIH w/CT & pumped gelled sand slurry containing 20/40 mesh sand, to place a sarnd plug over the
squeezed perforation intervals located between 12124' MD & 12182' MD. POOH w/CT. RD.
6/8/94 ·
RIH & tagged the sandplug top at 12127' MD.
6/9/94 ·
RIH w/CT & pumped gelled sand slurry containing 20/40 mesh sand, to raise the sand plug top to
12050' MD. POOH w/CT. Rigged down.
6/10/94'
RIH & tagged the sandplug top at 12049' MD.
RECEIVED
JUL 11 1994
0il & Ga~.s. Commission
Ani~ra~(~
16-04A
DESCRIPTION OF WORK COMPLETED
CTU CEMENT SQUEEZE FOR WSO & PERF BREAKDOWN / ACID STIMULATION
6/11/94'
A Fullbore Breakdown/Stimulation was pumped to remove suspect cement filtrate damage as follows:
MIRU & PT equipment. Pumped the Perf Breakdown/Stimulation Treatment fluids through the open
perforation intervals located above the sand plug (listed above).
Pumped:
a) 100 bbls Slick 1% NH4CI Water @ 9.4 bpm, followed by
b) 50 bbls Xylene preflush @ 4.9 bpm, followed by
c) 60 bbls 12% HCI, followed by
d) 30 bbls 9% HCI - 1% HF @ 5.4 bpm , followed by
e) 100 bbls 1% NH4CI Water @ 0.5 - 5.7 bpm, followed by
f) 60 bbls 12% HCI @ 2.5 bpm, followed by
g) 30 bbls 9% HCI- 1% HF @ 3.9 bpm, followed by
h) 100 bbls 1% NH4CI Water @ 1.2 bpm, followed by
i) 17 bbls Saturated Benzoic Acid Flake Diverter, followed by
j) 10 bbls 1% NH4CI Water spacer, followed by
k) 27 bbls 12% HCI, followed by
I) 12 bbls 9% HCI - 1% HF @ 1.7 bpm, followed by
m) 160 bbls 1% NH4CI w/5% Musol Water Overflush @ 3 bpm, followed by
n) Shutdown.
Rigged down.
Returned the well to production w/lift gas & obtained a valid welltest.
RECEIVED
JUL 1 1 1994
Alaska Oil & Gas Cons. Commission
Anch0ra§~
ARCO Alaska, Inc.
Date:
Apr 14, 1994
P.O. Box 100360, A lorage, AK
Transmittal #: 94034
Subject'
From/Location'
Telephone:
To/Location:
ARCO Cased Hole Finals
John-E. DeGrey/ATO- 1529
(907) 263-4310
Distribution
Well
Number
! ff ~.-~.: 01-09A
01-11 ~
01-33
03-01
7~-3qi 03-02
~5-~?..i 03-19
.~03-29
...%O3-29
Log Date
(M-D-Y)
04-02-94
03-25-94
03-28-94
03-27-94
03-22-94
Tool Type
¢' Perf Record
TDT-P
·
, / TDT-P
· / Perf Record
..
~ Leak Detection
03-22-94 ~ Bridge Plug
03-18-94 .~ Leak Detection
03-27-94
03-31 03-27-94
03-29-94
03-29-94
i /04-43
~i q,-' ~ ~)i~/' 04-43
' i ~,04-43
Bridge Plug
Bridge Plug
TDT-P
Run,
Scale
75--7M
7~i
1~ 5tI
l I 5II
! 5II
! 5II
, 2'
1 5"
1 5"
1 5"
1 5"
1 5"
1 5"
Contractor
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
i / CNTG S c h
03-10-94 i¢' USIT 1 5" Sch
: ..
04-44 03-13-94 ~v' USIT Sch
04-45 03-29-94 i¢- USIT Cement Sch
05-08 03-14-94 !,/ Prod Profile Sch
03-18-94 i¢' Perf Record Sch
..
~.~ Perf Record " ~ Sch
06-19
07-08
07-23
1 5"
1 5"
1 5"
1 5"
1 5"
1 5"
Bridge Plug
Prod Profile
04-03-94
03-21-94
Sch
09-01 03-30-94 1, 1"&5" Sch
09-02 03-17-94 J Prod Profile 1, 5" Sch
1, 1"&5" Sch
03-29-94
04-01-94
03-16-94
03-22-94
03-16-94
03-29-94
03-18-94
! 5II
511
1 511
! 5fl
! 5II
1, 1"&5"
1, 1"&5"
511
Prod Log
Perf Record
/ Prod Log
,' Perf Record
Patch setting
Perf Record
Prod Profile
Leak Detection
-- CNL
03-15-94
03-28-94
Sch
Sch
Sch
Sch
Sch
Sch
Sch
7f~- 5¢j 09-03
o9-19
~%- 2.%..: 09-27
~3-~0~ 11-04
-
~1.~9i 11-17
5-~ 11-24A
~-~ 12-06A
tZ-~! ~3-20
Sch
14-03
~2--~1 { 14-23
'i~i 4-28
~2.-I 7.. 4-28
i "t14-28
1~5-1~ 14-35
i 18-08
03-19-94 ~ Prod Profile 1, 1"&5" Sch
03-15-94 !¢. Leak Detection 1, 5" Sch
03-28-94 v~ 1, 5" Sch
511
03-21-94
Patch Setting :
..
Bridge Plug
CNL
Leak Detection
Sch
. 03-17-94 1, 5" Sch
03-15-94 i¢- Perf Record i 1.5" Sch
03-14-94 1, 2"&5"
1,5"
1,5"
03-14-94 i ¢' Perf Record
03-20-94 j,/ TDT-P
Sch
Sch
Sch
Number of Records: 38
ARCO Alask& inc. Is a Subsidiary of AtlantlcRIchfieidCompany
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 01-04-94
REFERENCE:
'ARC~ FINAI~
~-~'~ 5-03A 5/31-6/11/93
~/'~-53 · 9-31A 4/16-17/93
q~--~i · · 9-36A 3/31-4/6/93
o/2_~ t *** 16-4A 02-19-93
c:~.~oz AGI-5 05-10-93
,? ?>--~: ~ AGI-6 05-10-93
SHm I GR ~¢ ~ I~x~v Run~l.&2, 2"&5" Ana
MWD: GR ~imc ~q -~ ~" ~ Ana
MWD: GR S:~-~'¥'~. ;~1,,~ Ana
SSTVD y~o;:zo- i~-~$-o R~_m 1, l"&2" Arias
GR/~L C~cc~- °l~C Run 1, 5" Sch
GR/CCL ic'.~,,c. '~ -:.~ Run 1, 5" Sch
Please sign and return the attached copy as receipt of data.
/ /- ...?., /
RECEIVED BY _:":":. ~-'-->' "'
Have A Nice Day!
John DeGrey
ATO-1529
..?
APPROVED ~
Trans# 9400.~-' ~ ~
# CENTRAL FILES
# CHEVRON
#D&M
# ANO8 GEOLOGY
# EXXON
# MOBIL
# PHILLIPS
# PB WELL FILES
# BPX
# STATE OF ALASKA
The corrected API# for 9-31A is 50-029-21396-01.
The corrected API# for 9-36A is 50-029-21429-01.
The corrected API# for 16-4A is 50-029-20561-01.
Al~ka Oil .& Gas Cons.
STATE OF ALASKA
ALASKA''~--'_ AND GAS CONSERVATION C('-- MISSION
REPORT SUNDRY WELL OPi::RATIONS
1. Operations performed:
Operation shutdown Stimulate Plugging Perforate X
Pull tubing ~ Alter casing Repair well Other
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
1656' SNL, 1078' EWL , Sec. 24, T10N, R15E, UM
At top of productive interval
2129' NSL, 4348' WEL, Sec. 18, T10N, R16E, UM
At effective depth
At total depth
2493' NSL, 4265' WEL, Sec. 18, T10N, R16E, UM
5. Type of Well
Development
Exploratory
Stratigraphic
Service
6. Datum of elevation(DF or
72' RKB "iii c~feet
7. Unit or Property
Prudhoe Bay Unit
8. Well number
16-04A
9. Permit number/approval number
92-151
10. APl number
50 - 029-20561-01
11. Field/Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
12383 feet Plugs(measured)
9185 feet
Effective depth: measured 12337 feet
true vertical 9157 feet Junk(measured)
Casing Length Size Cemented Measured depth
Conductor 100' 20" 300 sx PF 100'
Sudace 2623' 13-3/8" 2700 sx Fondu & 400 sx PF 2623'
Production 10257' 9-5/8" 500 sx CL 'G' 10257'
Liner 2333' 7" 477 cu ft CL 'G' 10050-12383'
True vedicaldepth
100'
2623'
7884'
7740-9188'
Perforation depth: measured 11954-11974';11982-12000';12124-12136';12144-12150';12174-12182'
true vertical 8929-8941 ';8946-8957';9031-9039';9043-9047';9061-9066'
Tubing (size, grade, and measured depth) 4-1/2",12.6#,13CR-80 @ 11626' MD;4-1/2" x 3-1/2" xover @ 11626'
MD;3-1/2",9.2#,13CR-80 w/tail @ 11685' MD
Packers and SSSV (type and measured depth) 9-5/8" x 4-1/2" Baker SAB-3 pkr @ 9980' MD; 7" x 4-1/2" Baker SABL-3 pkr @ 11622'
MD;4-1/2" Camco TRDP-4A SSSV @ 2175' MD
I~ i~,.~ ~ .....
13. Stimulation or cement squeeze summary
Intervals treated(measured)
Treatment description including volumes used and final pressure
Alaska OJJ & ~aS OLJi't$. bUli~iflJsS~u
14.
Prior to well operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
0 0 0
Tubing Pressure
Subsequent to operation 1857 3086 2298
15. Attachments 16. Status of well classification as'
Copies of Logs and Surveys run
Daily Report of Well Operations X Oil~ Gas __ Suspended
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed - - k-,~L;,,o.~, '
R4
Form 10-404 ,v 06/15/88 \
304
Service
FS-2 Senior Engineer
Date
SUBMIT IN DUPLICATE
,II.y REPORT OF WELL OPER. iONS
DS 16-04A Perforating Operations'
ARCO Alaska, Inc. perforated DS 16-04A at selected intervals in the
Sadlerochit Formation of the Prudhoe Bay Unit on 3/9/93 and 3/11/93.
The intervals perforated were the following: 11954' - 11974', 11982' -
12000', 12124' - 12136', 12144' - 12150' and 12174' - 12182' MD
(Reference Log: SWS-BHCS dated 2/19/93). Completion fluids were in the
wellbore during perforating operations. All wireline work was done through
a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximum expected
surface pressure.
A short summary of the work is given below:
Began perforating operations on 3/9/93. RU perforating unit,
pressure tested BOP's and lubricator to 3500 psi, okay. RIH and
perforated 12144'-12150' MD at 4 SPF, Logged up and perforated
12124'-12136' MD, POOH, and confirmed all shots fired. RIH and
perforated 12174'-12182' MD at 4 SPF, POOH, and confirmed all
shots fired. (ref: SWS-BHCS of 2/19/93). Rigged down and secured
well.
Continued perforating operations on 3/11/93. RU perforating unit,
pressure tested BOP's and lubricator to 3000 psi, okay. RIH, opened
well to flow and perforated 11982'-12000' MD at 4 SPF, SI well,
POOH, and confirmed all shots fired. RIH, open well to flow and
perforated 11954'-11974' MD at 4 SPF, SI well, POOH, and confirmed
all shots fired. (ref: SWS-BHCS of 2/19/93). Rigged down and
secured well.
RDC: 9/3/93
ARCO Ala-~ka, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 5-10-93
REFERENCE: ARCO DIRECTIONAL DATA
c~ ~ ~-1-24A
_/3-15A
c}~q ~_~-3-18A
c~ ~.q-~--3-20A
/3-25i
q-~ ~c~ ~3-36
NO,5A
qz~ ~5-27
2~ t~3~8-29
. ~~A~I-4
~ ~ ~~AG I-6
-- ~ / ~GI-7
~GI-8
~~ ~ ~GI-9
12-20-92
2-25-93
2-27-93
4-19-93
4-9-93
3-19-93
3-23-93
4-18-93
2-23-93
2-26-93
3-7-93
3-13-93
4-6-93
4-15-93
3-7-93
4-1-93
12/6-23/92
1123-216/93
MWD Directional Survey
MWD Directional Survey
Electronic Multi-Shot Survey
MWD Directional Survey
MWD Directional Survey
MWD Directional Survey
Electronic Multi-Shot Survey
MWD Directional Survey
MWD Directional Survey
Electronic Multi-Shot Survey
MWD Directional Survey
Electronic Multi-Shot Survey
MWD Directional Survey
MWD Directional Survey
MWD Directional Survey
MWD Directional Survey
MWD Directional Survey
MWD Directional Survey
12/30-1/15/93 MWD Directional Survey
12-9-91 MWD Directional Survey
1-15-92 MWD Directional Survey
1/92 MWD Directional Survey
2-9-93 MW]) Directional Survey
1-16-93 MWD Directional Survey
12-27-92 MWD Directional Survey
1-18-93 MWD Directional Survey
1-17-93 MWD Directional Survey
2-16-93 MWD Directional Survey
2-24-93 MWD Directional Survey
4-28-93 MWD Directional Survey
3-7-93 MWD Directional Survey
3-17-93 MWD Directional Survey
3-30-93 MWD Directional Survey
Please sign and return the attached copy as
RECEIVED BY_~~
Have A Nice Day!
Sonya Wallace
ATO-1529
CHEVRON
# CLINT CHAPMAN
# EXXON
MOBIL
Ana
Job#AKEI30010 Sperry
Job#1209 BHI
Ana
Ana
Job#AKEI30016 Sperry
Job#AKMW30020 Sperry
Job# 1188 Teleco
Job#AKEI30009 Sperry
Job# 1192 Teleco
Job#AKEI30012 Sperry
Job#1202 BHI
bna
bna
bna
Job# 1159 Teleco
Job# 1175 Teleco
Job # 1167 Tele co
Job#AKMM911128 Sperry
Job#AKMM911231 Sperry
Sperry
bna
Job#AKMW30003 Sperry
Job#AKMM921231 Sperry
Job# 1168 Teleco
Job# 1172 Teleco
Teleco
Job//1185-450 Teleco
Job# 1185 Teleco
Job# 1190 Teleco
Job//1195-450 Teleco
Job#1205 BHI
receipt of data.
APPROVED
~s~ 93059 '~rog~. ~(~b~'-.,,.
~ PB ~LL FreES
~ BPX
~ ST. OF AK. (2 COP~)
~ LUCILLE JO~STON
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 7-20-93
REFERENCE: ARCO CASED HOLE FINALS
1-28 ~'~'? %-18-93
3-25A ~'~3 6-17-93
3-31 }V-gz 6-16-93
3-32 ~ ~/~/~7 6-15-93
3-33 ~ ¥~ ~Jo 6-16-93
4-8 ?i-r~ 6-11-93
5-14 ??-}~ 6-12-93
6-22A ~ ~.~6-6-93
6-22A - 6-10-93
7-25 ~- Y ~. 6-6-93
9-44 ~ ~ -~ z~6-6-93
11-18 f~-oz6-7-93
14-6 I~ ~- ~ ~6-8-93
14-8 ?~/,~ 6-10-93
14-13 ~'~ 16-13-93
14-15 fF~ 6-8-93
16-4A fz~¢~6-9-93
16-17 ~' zz~6-14-93
16-31 ~ ~-~ i 6-7-93
17-4 ~~ 6-14-93
AGI-5 5~-~-6-13-93
AGI-6 ~?-d~ 6-14-93
AGI-7 _6-8-93
AGI-7 ~ ~-t6-15-93
AGI-7 6-17-93
Prod Profile
Completion Record
Plug Setting Record
Plug Setting Record
Plug Setting Record
Perf Record
TBG Cutter Record
Leak Detect
Leak Detect
Perf Record
Perf Record'
Production Log
PITS/Le~ Ir Detect
Leak Detect
Profile
Completion Record
Prod Profile
Perf Record
Production Log
Completion Record
Completion Record
Completion Record
Perf Record
R~m 1, 5" Sch
R~m 1, 5" Sch
R~_m 1, 5" Sch
R~_m 1, 5" Sch
R~_m 1, 5" Sch
Run 1, 5" Sch
Run 1, 5" Sch
Run I 2" Sch
R~_m 1, 5" Sch
Run 1, 5" Sch
Run 1, 5" Sch
Rim 1, 5" Sch
Rim 1, 5" Sch
R~m 1, 2"&5" Sch
R~m 1, 5" Sch
Run 1, 5" Sch
Run 1, 1"&5" Sch
R~m 1, 2"&5" Sch
R~_m 1, 5" Sch
Run 1, 5" Sch
R~_m 1, 5" Sch
Run 1, 5" Sch
Run 1, 5" Sch
R~m 1, 5" Sch
R-n 1, 5" Sch
AGI-8 ~$ ~/6-9-93 GR/CCL R.n 1, 5" Sch
AGI-9~ }~3{ 6-9-93 GR/CCL R~_m 1, 5" Sch
AGI-9i ~ 6-17-93 Pe~ Record R~m 1, 5" Sch
RECEIVED B~~~~~/~' ~~ ~
Son a W~ace APPROVED ~~ ~.
Y ........ ~ ~ . ~
ATO-1529 ~~ 93073 _~ , ~ ~
' ~
~ B~ ~ ~ON ~
t STA~ OF ~~ t MOB~ '/~
* ~e ~~t ~t ~ ~32 ~ ~21141~.
= ~e c~ct ~H ~e ~r th~ 1~ ~ ~2~
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 04--22-93
REFERENCE:
3-13-93 Production Log ~ 1, [~' Sch
3-15-93 Production Log Run 1, ~' Sch
3-14-93 Spin/Temp/Gradlo/Press Run 1, [~' Sch
3-14-93 CBT Color Run 1, ~' Sch
3-14-93 USIT (Cement & Corrosion) Color Run 1, ~' Sch
3-16-93 PerfRecord Run 1, [~' Sch
3-14-93 Tubing Cut Record l~m 1, IY' Sch
3-12-93 Pe~ Record Run 1, [~' Sch
3-18-93 Perf Record Run 1, 5" Sch
3-18-93 Perf Record Run 1, 1~' Sch
3-13-93 (IR ~o~. Run 1, 2~'&i~' Sch
3-14-93 T~hing Cut Record l~m 1, [~' Sch
3-12-93 Production Log Run 1, 5~' Sch
3-15-93 Leak Detect Run 1, 2~'&i~' Sch
3-19-93 - Production Log Run 1, t~' Sch
3-17-93 Tie-In GR/CCL Run 1, 5~' Sch
3-17-93 Inj Prof/Spin/Temp/Press Run 1, 5" Sch
3-17-93 Production Log Run 1, I~' Sch
3-20-93 PITS Run 1, [~' Sch
3-16-93 Production Log l~m 1, 1~' Sch
3-11-93 PerfRecord Run 1,/~' Sch
3-12-93 Press/Temp Run 1, 1~' Sch
Please sign and return the attached copy as receipt of data.
RECEIVED BY_~_~_~~
Have A Nice Day!
Sonya Wallace
ATO-1529
APPROVED__~
Trans# 93048
# CENTRAL FILES
# CHEVRON
# LUCILLE JOHNSTON
# EXXON
# MOBIL
# PHILLIPS
PB WELL FILES
# BPX
# STATE OF ALASKA
* The correct API# for 1-5ST is 50-029-20076-00.
ALASKA OIL AND GAS CONSERVATION CO~wMISSION //fl/_,~_ /
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska,/nc, 92-151
3. Address B. APl Number
P. 0. Box 196612, Anchora~/e, Alaska 99519-6612 50- 029-20561-01
:4. Location of well at surface 9. Unit or Lease Name
1656' SNL, 1078'EWL, SEC. 24, TION, R15E, UM ~ ............. Prudhoe Bay Unit
At Top Producing Interval ~ ~ .. ~-.~ ~ i,t~;~ll~ l 10. Well Number
2129' NSL' 4348' WEL'SEC'18' T10N' R16E' UM i ~'~'~2--~' ~
~ ~ 11 Field and Pool
At Total Depth
Prudhoe
Bay
Field/Prudhoe
Bay
Pool
2493' NSL,4265' WEL, SEC. 18, TION, R16E, UM
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Sedal No.
KBE = 68' I ADL 28348
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 16. No. of Completions
2/10/93 2/18/93 3/9/93I N/A feet MSL One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost
12383' MD/9185' TVD 12337' MD/9157' TVD YES [] NS []I 2175'feet MD 1900' (Approx.)
22. Type Electric or Other Logs Run
D L l../Mic roiog/G R/S P/B H S C/N eut ro n
23. CASING, LINER AND CEMENTING RECORD
SE'I-rING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BO'FI'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 94~ H-40 Surface 100' 32" 345 sx AS II
13-3/8" 72# L-80 Surface 2623' 17-1/2" 2700 sx Fondu & 400 sx PF
9-5/8" 47# L-80/S0095 Surface 10207' 12-1/4" 500 sx Class "G"
7" 26#/29# NT80/13CR 10050' 12383' 8-1/2" 477cu ft Class "G"
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET(MDI PACKER SET (MD)
Gun DiameterMD 2-1/8" 4 sP~_vD 4-1/2" x 3-1/2" 11685' 11622'
11954'-11974' 8927'-8939'
11982'-12000' 8944'-8955' 26. ACID, FRACTURE, CEMENT SQUEEZF_, ETC.
12124'-12136' 9029'-9036' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIALUSED
12144'-12150' 9041'-9045'
12174'-12182' 9059'-9064'
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
3/9/93 Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
RECEIVED
APR 2 1993
AJaska Oil & Gas Cons. Commission
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS F-~,~MATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Sag River Absent
Shublik Absent
Top Sadlerochit 11918' 8906'
Zone 3 11954' 8927'
4'~ask~ .0il .& Gas Cons, (.;0mi~issio,,~
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~ Title Drilling EngineerSuprv/$or Date
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and Icg on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: DS 16-4A
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-029-20561
PERMIT:
APPROVAL:
ACCEPT: 02/03/93 04:00
SPUD: 02/09/93 06:00
RELEASE:
OPERATION:
DRLG RIG: NABORS 2ES
WO/C RIG: NABORS 2ES
02/03/93 (1)
TD: 0
PB: 0
TAKING ON SEAWATER
ACCEPT RIG 0400 HRS. TAKE ON SEAWATER.
MW: 8.5 Seawater
02/04/93 (2)
TD: 0
PB: 0
PULLING 5.5" TUBING MW: 8.5 Seawater
RU LUBRICATOR. PULL BPV. SET BPV. RU HYDRAULIC LUBRICATOR
AND PULL BPV.
02/05/93 (3)
TD: 0
PB: 0
02/06/93 (4)
TD: 0
PB:10410
02/07/93 ( 5)
TD: 0
PB:10359
02/08/93 (6)
TD:10257' (
02/09/93 (7)
TD: 0
PB: 0
o)
POH MW: 8.5 Seawater
LAY DOWN 182 JOINTS OF TIBING AND TUBING PATCH. PREPALCE
AND TEST TOP RAMS 7" TO 3-6 VARIABLES. MU AND STRAP BHA#1.
RIH TO 7514'. MAKE BLIND BACK OFF. WORK 76 TURNS OF LEFT
HAND TORQUE. CBU @ 8BPM AND 500 PSI. POH.
POH WITH TUBING FISH MW: 8.5 Seawater
LD BHA #1. RU WESTER ATLAS TO JET CUT TUBING AT 10550'. PU
TO 10410 AND MADE JET CUT. MU BHA#2 AND RIH TO 7529'. POH
SLOW DUE TO HIGH WINDS. LAY DOWN OVER SHOT. LD 70 JOINTS
5.5 TUBING AND 13' CUT OFF.
POH TO PU SECTION MIL MW: 8.5 Seawater
LD BHA. RU ATLAS AND RIH WITH 8.5" GAGE RIG AND JUNK
BASKEDT. UNABLE TO GET PAST 9705'. POH BASKET EMPTY. PU ADD
WIEIGHT AND RIH SET DOWN AT 10360'. POH CEMENT CHUNKS INB
ASKET. CONTINUE TO RIH WITH EZSV. TAG UP WITH 15K AT 10360.
SET PACKER AO 10359'. POH.
POH WITH SECTION MILL MW:10.0 VIS: 90
CONTINUE TO POH. RU AND RIGH WITH BHA #3. RIH TO 10207'
MAKE CONNECTION PULL 300K INTO CASING TO MAKE CONNECTION.
CONTINUING PUMPING LOW VIS SWEEPS TO CLEAN HOLE. PULL
AGAINST SHOE 325. WORK MILL ROTATE ON STUMP WITHOUT ON
THIRD TRY KNIVES CLOSE. POH.
TEST BOPE. MW:10.0 KC1
POOH. RIH W/ MULE SHOE. WASH TO 10359'. PUMP 9 BBLS
WATER, 33 BBLS 'G' CMT W/ .8% CD-32, .15% FL-52, .08% A-2,
1 GHS FP-6L. POOH 12 STDS. SQZ'D WELL W/ 2000 PSI. POOH.
TEST BOPE.
& Gas Cons. L, urm-'mssio~'
Anchorage
WELL : DS 16-4A
OPERATION:
RIG : NABORS 2ES
PAGE: 2
02/10/93 (8)
TD:10378' ( 121)
02/11/93 ( 9)
TD:10702' ( 324)
DRAG. MW: 9.8 VIS: 62
TEST BOPE RIM W/ BHA. WASH F/ 9900'-10140' TAG CMT.
DRAG CMT ~/ 10140'-10212'. KICKOFF & DDRLG F~
10212'-10378'.
POOH.
DRAG TO 10702'
MW: 9.8 VIS: 50
SURVEY. POOH TO CHECK MWD.
02/12/93 (10)
TD:l1029' ( 327)
DRAG. MW: 9.8 VIS: 52
CHANGE MWD. RIH. DRAG F/ 10702'-11029'.
02/13/93 (11)
TD:11454' ( 425)
02/14/93 (12)
TD:11456' ( 2)
02/15/93 (13)
TD:11458' ( 2)
02/16/93 (14)
TD:l1680'( 222)
02/17/93 (15)
TD:l1890' ( 210)
DROP SURVEY P.O.O.H.11454' MW: 9.8 VIS: 58
CONTINUE DRILLIN 8.5" HOLE W. BIT #2 ON BHA#5 FOR DIRECTION
LEFT TURN F/1129'-11348' SLIDE AND ROTATE; ROTATE F/
11348'-11454' UP WEIGHT 255K, DN WEIGHT 120K, ROTARY
WEIGHT 173K, 150 SPM/3100 300/320 AMPS 12145-13450 FT/LB.
DROP SINGLE SHOT. WILL P.O.O.H.
P.O.O.H. W/MILL MW: 9.8 VIS: 67
CONTINUE DROP SURVEY AND CIRCULATE. P.O.O.H. TO 9 5/8"
CASING SHOE @10207' 10-15K DRAG 25K MAX, PUMP PILL.
P.O.O.H. RECOVER SURVEY, L/D MWD, LOST #1 CONE AND SHANK IN
HOLE. SHANK BROKE 1/4" BELOW WELD OF LUG. L/D TOOLS.
R.I.H W. FISHING BHA #6 TO 11394' WASH AND REAM 60' TO
BOTTOM @11454' MILL ON JUNK CONE & SHANK 11454' TO
11456'. CONTINUE TO P.O.O.H.
P.O.O.H W/ FISHING TOOLS MW: 9.8 VIS: 72
CONTINUE P.O.O.H W/ 8 3/8" TR-STATE CONCAVED JUNK MILL.
REAM F/ 11375' TO 11456'. DRILLING ASSEMBLY R.I.H. TO
11416'. PUMP PILL AND P.O.O.H.
DRILLING AHEAD W/ 8.5" BIT MW: 9.9 VIS: 68
M/U BHA#9 AND R.I.H 11403', BREAK CIRCULATION @ 5200'
10200' WASH TO BOTTOM F/ 11403'-11458'. UP WEIGHT 2~5K,
DN WEIGHT 130K, RT WEIGHT 170K 50 RPM 280/340 AMPS
10900/14750 FT/LB. DRILL F/11458' WORK PIPE TO CLEAT ANY
JUNK F/ UNDER BIT 155 SPM/2700. BRING PUMPS TO 165
SPM/2900 PSI 80 RPM 45K WOB. DRILLING @11680' @0600 HRS
DRILLIN (RATE 18 FPH)
DRILLING 8-1/2" HOLE MW: 9.8 VIS: 56
CONTINUE DRILLING FROM 11680' TO 11854. 80 RPM, 500 GPM,
13.5K/18.7K FT-LBS. WASH/REAM FROM 11750' TO 11854' N
FILL. DRILL AHEAD FROM 11854' @ 15FPH. 3' DRILLING BREAK
@ 11875' MD (8889'TVDBKB,N2ES). THIS IS PREDICTED TOP OF
SADLEROCHIT. SOME GAS CUT MUD ON BOTTOMS UP.
WELL : DS 16-4A
OPERATION:
RIG : NABORS 2ES
PAGE: 3
02/18/93 (16)
TD:12383' ( 493)
02/19/93 (17)
TD:12383' ( 0)
02/20/93 (18)
TD:12383' ( 0)
02/21/93 (19)
TD:12383
PB: 0
02/22/93 (20)
TD:12383
PB: 0
02/23/93 (21)
TD:12383
PB:12337
02/24/93 (22)
TD:12383
PB:12337
02/25/93 (23)
TD:12383
PB:12337
WORKING STRUCK PIPE @ 12140' MW: 9.9 VIS: 62
CONTINUE DRILLING FROM 11890' TO TD AT 12383' MDBKB. TOP
OFSADLEROCHIT @ 11875' MD, 8889' TVDBKB. BEGIN SHORT TRIP
TO SHOE W/ 20-50K OVER ON DRAG (NORMAL FOR HOLE). PIPE
STUCK: 12140'
LOGGING MW: 9.9 VIS: 0
WORK PIPE. PUMP 45 BBLS SFT. JAR. PUMP 19 BBLS SFT.
PIPE FREE. SHORT TRIP TO WINDOW. CIRC. POOH. R/U ATLAS.
LOG RUN: DLL/MICROLOG/GR/SP/BHCS/NEUTRON.
RIH W/ 7' 13CR/L-80 LINER MW: 9.5 VIS: 48
CONTINUE LOGGING UP. MU AND RIH W. BHA #11. WASH BOTTOM
30'. POOH W/ BHA #11. RIH W/ 7" 29# 13-CR X 7" 26# L-80
LINER.
BOP TEST MW: 9.5 WBM
RIH W/ 7" LINER. PUMP 25 BBLS 12 PPG SPACER, 25 BBLS
SPACER, 85 BBLS G CEMENT. DISPLACE W. MUD. BUMP PLUG, SET
HANGER W/ 32 PSI, SET PACKER W. 4000 PSI. RELEASE FROM
LINER. POOH. LD BHA, TEST BOP.
POOH W/ 6" C/O BIT & 7" SCRAPR MW: 8.6 Seawater
CONCLUDE WEEKLY BOP TEST. RIH W/8-1/2 BIT AND 9-5/8 CASING
SCRAPER. POOH AND LD BHA. RIH W/ 6" BIT AND 7" CASING
SCRAPER ON 60 JTS. PU KELLY AND WASH TO LC. TEST CASING,
LINER & LAP TO 3000 PSI.
POOH W/ POLISH MILL MW: 8.6 Seawater
POOH W/ 6" BIT & 7" CASING SCRAPER. RIH, SET RTP @6663',
TEST 9-5/8" CASING TO 3000 PSI, CONTINUE TO RIH, TAG TOL @
10,059' W. RTP. SET RBP @ 10,088, SET 9-5/8 RTP @ 10,040.
RECOVER 7" RBP AND SET @ 10,069, SET 9-5/8' RTP @ 10,016.
POOH W/ RBP AND RTP. LD 60 JTS 3-1/2" DP ON TRIP. LD BHA.
PU AND RIH W. LINER TIEBACK RECEPTACLE POLISH MILL. TAG
TOL @ 10,059' POOH W. POLISH MILL.
RUN 3.5" & 4.5" COMP. TAG MW: 8.6 Seawater
CONTINUE POOH L/D POLISH MILL. TIEBACK SLEEVE. RIH TO
LINER TOP @10063' L/D 4.5 DRILL PIPE, CUT 74' AND LIP 37'
DRILLING LINE. CONTINUE TO L/D DRILL PIPE AND BAKER
RUNNING TOOL. R/U TO RUN CHROME TBG.
N/U TREE MW: 8.6 Seawater
CONTINUE RUNNING 3.5" AND 4.5" COMPLETION TUBING W.
JEWELRY. DROP ALL AND LAND TBG. RUN IN LOCK DOWN SCREWS,
BACK OUT LANDING JOINT, RUN BPV. N/D BOP'S AND NU TREE.
Alask-~, Oil .& Gas Cons,
WELL : DS 16-4A
OPERATION:
RIG : NABORS 2ES
PAGE: 4
02/26/93 (24)
TD:12383
PB:12337
02/27/93 (25)
TD:12383
PB:12337
02/28/93 (26)
TD:12383
PB:12337
03/01/93 (27)
TD:12383
PB:12337
03/02/93 (28)
TD:12383
PB:12337
03/03/93 (29)
TD:12383
PB:12337
PULL AND L/D 4.5' TBG MW: 8.6 Seawater
CONTINUE TO N/U GRAY GEN II 5 1/8" 5M TREE AND TEST.
PRESURED TBG TO 3500 PSI SET BAKER 7" X 4.5" SABL-3 PACKER
@ 11622', BLEED TBG TO 1220 PSI. R/U CAMCO WIRE LINE UNIT
R.I.H. AND RECOVER 1 5/16 BALL AND ROD. TEST DOWN TBG TO
3500 PSI W/ O PSI LOSS. CAMCO RUN #2 R.I.H. W/ EQUILIZER
TOOL, RUN #3 R.I.H. AND RECOVERED RHC PLUG. RUN BPV N/D
TREE AND N/U BOP'S. R.U. ATLAS WIRE LINE R.I.H. W/ 3.5"
JET CUTTER LOCATE AND CUT FIRST 3.5" JOINT OF TBG @ 11542'
MIDDLE OF JOINT. PULL AND LAY DOWN 4.5" TBG.
RAISED EFC COST TO 2,467M, REASO DIFFERENTIAL STICKING
PROBLEMS WHILE DRILLING. FAILED LINER TOP PACKER AND
REPAIR OF THE SAME. PER LARRY PARNELL 02/24/93.
P/U DP RIH W/ TEST PKR & STEAM MW: 8.6 Seawater
CONTINUE TO POOH L/D TOTAL OF 251 JOINTS OF 4 1/2". RUN
WEAR RING. P/U BAKER 7.5" SEAL ASSY AND 9 5/8" TEST PACKER,
P/U 4 1/2" DRILL PIPE, RIH.
M/U TSA 5 3/4" OVERSHOT RIH MW: 8.6 Seawater
CONTINUE TO P/U 4 1/2 "DP AND RIH W/ BAKER 7.5" SEAL STEM
AND 9 5/8" TEST PACKER. TAG LINER TOP @10046'. PULL UP TO
10013 W/ TEST PACKER SET, WILL SET 9-5/8 STRADDLE PACKER
IN THIS JOINJ. POOH L/D BAKER 9 5/8" TESE PACKER AND SEAL
DTEM OK. P.U TRI-STATE 5 3/4" OVERSHOT DRESSES W/ 3 1/2"
HOLLWO MILL CONTROL. CONTINUE TO RIH TO 11520. P/U KELLY
UP WEIGHT 220K, DOWN WEIGHT 150K, ROTARY WEIGHT 180K. POOH
NO RECOVERY, BREAK DOWN OVERSHOT, RIH ON SAME BHA#16.
L/D 3-1/2" TBG OUT OF DERRICK MW: 8.6 Seawater
CONTINUE TO RIH W/ BHA #17. P/U KELLY, RELEASE BAKER "K"
ANCHOR 11622'. POOH SLOW W/ FISH. L/D OVERSHOT, RIH W/ 4
3/4" DC'S AND 3-1/2" DP. L/D SAME, RIH W/ 4-1/2" DP, L/D 4
1/2" DP R/U 13 CR TBG TOOLS AND RIH W/ 3 1/2" TBG, L/D 3
1/2" TBG.
RUN 4.5" COMPLETION MW: 8.6 Seawater
CONTINUE TO L/D 3 1/2" TBG. PULL WEAR RING. PUT NEW 4.5'
TUBING IN HOUSE. P/U AND RUN 4.5" TUBING COMPLETION W/
STRADDLE PACKERS TO COVER LINER LAP. P/U SSSV, TEST LINES
TO 5000 PSI. CONTINUE RUNNING 4.5" TUBING.
PER LARRY PARNELL 3/2 EFC $2,000,000.00
RELEASED MW: 8.6 Seawater
CONTINUE TO RUN 4.5" COMPLETION. LATCH INTO 7" BAKER SABL
PACKER AT 11622' RU WIRLINE AND SET LOCK OU PRONG IN SSSV,
INSTALL BPV. NU BOP AND NU TREE. TEST CONTROL LINESSS,
PRESSURE TUBING, BLED TUBING AND TEST ANNULUS. PUMP 150
BBL DIESEL DOWN ANNULUS. SET BPV, RELEASE RIG.
4iaska Cil & Gas Cons.
10250 ~':~
;
R:,, 25
APR ~. :,~ lgg3
Anchorage
ft
..... .~-~ ~3~,00 440!~00 ~.:~,~: '%[0
E~,~ &~?4,Tg 3~42~g~ 48,72 ~,7(. 277~.62 4587,04 53~3,0) 58J~
2L8 8131,7 ~ 373!,25 47,01 37~3q 2810,2£ 4~15,3~ 5403.65 53.66
lO0'[ t
8,0"
i088i,25 ELL 8275,F2 4168,7] 53,00
I091i+97 30,7 8314~01 4193,05 53.43 22.95 29~7,24 4731,35 5600~81 57,55 7,01
11¢3,34,6( SG5 &L:.S,49 4257.7; 54.2~ iTJi: 3067,2~ 4757,91 5650,95 5%1v 7.25
11066,44 2I-3 ~04,2~ 4318,14 55,10 15,78 3115,37 4773~ii
i1'~%,,~0 :¢~.~.'~ 85[~,~:* *~, ,-ac 5o,=z __ .... _" *:I_* ...... u= ~c~ ? 55,(.2
55.~g 2.72
55,s7 2.90
2401 C~INABAR LOOP
ANCHORAGE, ALASKA 99507
(907) 349-6575
February 15, 1993
Prudhoe Bay Unit
P.O. Box 196612
Anchorage, AK 99519-6612
Attention: Larry Parnell
Dear Larry,
I have compiled a summary of Anadr/ll's performance on DS 16-4A, Nabors 2ES.
SERVICES PROVIDED
MWD with DWOB and DTOR was picked up on 09-FEB-93 to kick off at 10207' at the
top of the window. Tripped out at 10703' and changed MWD tools on 11-FEB-93 and
continued kick off. Reached 11458' on 13-FEB-93 and pulled out of hole because of hole
packing off and low ROP. Laid down MWD on 13-FEB-93 and rigged down. There were
a total of two standby days and five operating days on this well.
,lOB PERFORMANCE
DS S with downhole weight on bit and downhole torque were used to side track DS 16-4A.
The DWOB was used effectively to assist in the sidetrack process. The 2" MEL
(mechanical efficiency log) indicated that the bit was in new formation at 10230'. The
cement plug was a good hard plug making the kickoff routine.
We began to see usable surveys around 10572' but the magnetic interference continued to
some degree to 10700'. Due to some difficulty repeating a survey and the apparent lack of
left hand turn, (6 degree planned dogleg) the company man decided to pull out of the hole
to check the BHA and change the MWD tool. The Anadrill Engineer informed him that it
was probably magnetic interference and suggested drilling ahead at least 30 feet and
survey. The Company Representative felt that, even if the surveys were accurate we were
still 18 degrees behind the curve and that it would be prudent to check the motor, bit and
change MWD tools to be sure of what the hole direction was really doing. We ran back in
with a new MWD tool, bit and the same motor. We took three check shots on the way in
and they confinned the first tools surveys. Also the DD single shot matched the first tools'
surveys.
On the second run we had to slide over 90% of the time at first to assure that we would hit
the_ target. At 10458' the motor began to stall out while rotating and the hole appeared to be
packing off and we had a pump pressure increase of 300 psi. We pulled out of the hole and
a shank and number one cone were missing. The shank was broken off clean, which
indicated that the cone never locked, this was confirmed with absence of any excess
downhole torque.
Of the 100 surveys taken 10 were used by the directional driller and 37 were good surveys.
The final survey calculation gives the following : SURVEY DEPTH: 11382' TRUE
VERTICAL DEPTH: 8584.91' NORTH: 3368.39' EAST: 4830.36' SECTION: 4577.11'
We have included a SPIN log and a MEL log. Anadrill appreciates the opportunity to supply
services on your well and we look forward to continuing a healthy business relationship.
Sincerely,
Dan Bordelon
Manager-Alaska
Field Service Manager
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 3-22-93
REFERENCE:
1-32
7ST
~~EI4
ARCO CASED HOTF- FINALS
3-7-93 Perf Record Run 1,
2-27-93 CNL l~m 4,
2-27-93 CNL l~m 2,
2-28-93 CNL Run 2,
3-5-93 Dual Burst TDTP (Borax) Run 1,
3-1-93 CNL Run 2,
3-1-93 CNL Run 2,
3-6-93 Dual Burst TDTP Run 1,
2-25-93 Dual Burst TDTP (Borax) Run 1,
3-7-93 Collar (Jet TBG Cutter) Run 1,
3-3-93 Vertilog Run 1,
3-9-93 TBG Taft Punch Run 1,
3-2-93 Perf Record ~un 1, ~'.
Please sign and return the attached copy as receipt of data.
RECEIVED BY_~/~ ~f2///~ i_/~~
Have A Nice Day!
Sonya wallace
ATO-1529
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Atlas
Sch
Atlas
Sch
Sch
Atlas
Sch
Atlas
Atlas
APPR O VE D_.~~/_
Trans# 9304~''~-~- '--
# CENTRAL FILES
# CHEVRON
D&M
# LUCILLE JOHNSTON
# EXXON
MARATHON
# MOBIL
.# PHILLIPS
PB WELL FILES
R&D
# BPX
# STATE OF ALASKA
TEXACO
The correct APl# for 1-31 is 50-029-21626-00.
The correct well name for this log is 16-4.
ARCO Alaska, Inc.
P.O.Box 100360
· Anchorage, Alaska 99510
DATE: 3-17-93
REFERENCE:
.... ~9-4A
ARCO MAGNETIC TAPE(S) WITH LISTINGS
2-27-93 DLL~.I./AC/GR l~_m I Job~5903
2-25-93 BCS/DLL/CNTH/GR Run 1 Job~9~
Please sign and return the~ attached copy a~ receipt of data.
RECEIVED BY ~~~__~__ffi
Have A Nice Dayl
Sonya Wallace
ATO-1529
Atlas
Sch
Sch
Atlas
Teleco
CENTRAL FILES (CH)
CHEVRON
D&M
# BOB OCANAS (OH/GCT)
# EXXON
MARATHON
MOBIL
# PHILLIPS
PB WELL FILES
R&D
# BPX
# STATE OF ALASKA
TEXACO
RECEIVED
MAR 1 9 1993
O11 & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 3-2-93
REFERENCE: ARCO OPEN HOLE FINALS
2-25-9:3 DLL (Simultaneous)
2-25-93 B H C}S t...--
2-25-93 CNL
2- 9- 93 DLL/MSFL/GR
2- 9- 93 LD/GR/CNL (Raw)
l- ~- V 3 LD/GR/CNL (Poro)
1-18-~3 DLL/MSFL/GR
1-18-93 LDaeutron (Raw)
1 - 18- 93 LDINeutron (Poro)
2-19-932'19'93 ~DLL~LL/GR~_~,.~
~ ~ 1/26.2/12/93 DGRIEWR/FXE
1/26-2/12/93 OGR/CNP/DSFD/CAL
1/16-2/11/93 DGR/Near-Far Ave~
Color
Color
Color
Color
Color
Color
Run 1, 2"&$"
Run 1, 2"&5"
Run 1, 2"&$"
Run 1, 2n&S"
Run 1, 2"&5"
Run 1, 2"&5"
Run 1, 2"&5"
Run 1, 2"&$"
Run 1, in&s"
Run 1, 2"&5"
Run 1, 2"&5"
Runs 4-16, 2"&S"MD
Runs 4-16, 2"&S"MD
Runs 4-16, 2"&$"MD
1/26-2/12/93 DGR/EWR/FXE Runs 4-16, 2"&5"TVD
1/26-2/12/93 DGR/CNP/DSFD/CAL Runs 4-16, 2"&S"TVD
1/26-2/12/93 DGR/Near-Far Ave.~i~ Runs 4-16, 2"&S"TVD
CENTRAL FH. ES %o?a
C WON
C~T C~~
~ON ~/bo
~~ON
MOB~
Please sign and return ~99attac~e~l copy as receipt of data.
RECEIVED~~ ////~
Have A Nice D~ ' ~/ ....
Sonya Wallace ~)~(~~s~O~3Eo,D2_~__
# PB WELL FILES
R&D
# BPX
# STATE OF ALASKA
# TEXACO
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Atlas
Atlas
Sperry
Sperry
Sperry
Sperry
Sperry
Sperry
MEMORANDUM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
to:
David Johnsto~
Commissioner
thru: Blair E Wondzell~3~
Sr Petr Engineer '~
from: '~obby Foster
Petr Inspector
date:
file:
subject:
March 3, 1993
BOB02213. DOC
BOP Test-Nabors 2ES
ARCO - D.S. 16-4A PBU
Prudhoe Bay Field
PTD 92-151
Sunday, February 21, 1993: The BOP Test on Nabors Rig 2ES began at 6:30 a.m.
and was completed at 9:00 a.m. The one failure was a value in the choke manifold.
This will be repaired and a AOGCC representative will be notified within 4 days.
SUMMARY: I witnessed the weekly BOP Test on Nabors 2ES. Test time 2.5 hours,
I failure.
I was notified February 24, 1993 the value that failed had been repaired and tested.
Attachment
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: /z'--~ ~,Workover: ~? , DATE:
D rlg Contracto r: ~~~ Rig No. ~ ~'. PTD ~ ~~/~ Rig P ~~
Operator: ~~ Rep. .,~g~ -~ ~~ ~_ '
Well Name: ~ ,'~ /~, ~ ~ Rep. ~/~
Casing Size: ' '7" Set~ /~,~eet Loca~on:Sec.~' T. /~)~ R.' /~ Merd.
Test: In,al Weekly / Other
MISC. INSPECTIONS:
Location Gen.: -/~'
Housekeeping: ~,/' (Gen)
Reserve Pit.~
BOP STACK:
Ann. Preventer
Pipe Rams
Blind Rams
Chk/Ln Valves
HCR Valves
Kill Line Valves
Check Valve
Qua.
/
.I
/
/
Well Sign
Drl. Rig
Test
Pressure P/F
MUD SYSTEM: Light Alarm
Tdp Tank
Pit Level Indicators
Flow Indicator
Gas Detectors ,/,/'
FLOOR SAFETY VALVES:
Upper Kelly
Lower Kelly
Ball Type
Inside BOP
Quan.
/
Test
Pressure
P/F
CHOKE MANIFOLD: No. Valves
Manual Chokes
Hydraulic Chokes
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure /
200 psi Attained After Closure ~-~ minutes /
System Pressure Attained :~ minutes ~"~c~,
Blind Switch Covers: Master:
Nitgn. Btl's: ~ ~?
~ ~'-~> ~/6'~ Psig.
Number of Failures .... ~ ........ Test Tim~'"':'~/~"H~'~'~ ............ N"~'mi~';;
' ..........
IEquipment shall be~ L./ days. Notify the Inspector on duty and follow with Written or Faxed verification to
]the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARK ~..,'.
Distribution:
odg-Well File
c - Open/Rig
c - Database
.~- Tdp Rpt File
, Inspector
STATE WITNESS REQUIRED?
YES NO b~/
24 HOUR NOTICE GIVEN
YES NO
Waived By:
Witnessed B;:~--~?~_~~
t
FI-021L.XLT Rev. 1/93
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
THRU:
FROM:
David Johnsto ,r~
Commissioner
Blair Wondzell,¢~'~
P. I. Supervisor
Jerry Herring, [ f
Petroleum Insl~ector
DATE:
February 9, 1993
FILE NO: jh-rep9.doc
SUBJECT:
B.O.P. Test, Nabors 2ES
AAI, PBU, Pad 16-4A
PTD 92-151
Wednesday, February 3, 1993: I witnessed a B.O.P. test on Nabors rig 2ES on ARCO drill site 16-4A.
The well is a redrill and the 7" casing was set at 10,100 feet.
The test started at 6:00 p.m. and was completed at 11:30 p.m. (3) valves on the choke manifold
leaked. The valves were greased and retested satisfactorily. The top variable ram failed to hold
pressure and will be changed to a 7" ram and retested with a test plug upon pulling of the tubing. The
well sign and the kill sheet were missing and are to be posted upon making them.
Summary: The B.O.P. test on Nabors 2ES was completed in 5-1/2 hours and there were 4 failures.
Attachment
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: Workover: x
Drlg Contractor: NABORS Rig No.
Operator: ARCO Alaska, Inc.
Well Name: DS 16-4A
Casing Size: 7" Set @ loloo Feet
Test: Initial X Weekly Other
DATE: Feb. 3, 1993
2ES PTD# 92~151 Rig Ph.# 659-4835
Rep. Bob Lauley
Rep. Charlie Henley
Location: Sec. 24 T. 10N R. 15E Merd. UM
MISC. INSPECTIONS: P/F
Location Gen.: OK Well Sign NONE P
Housekeeping: OK (Gen) Drl. Rig OK Reserve Pit N/A
BOP STACK:
Ann. Preventer
Pipe Rams
Blind Rams
Chk/Ln Valves
HCR Valves
Kill Line Valves
Check Valve
Test
Qua. Pressure P/F
1 250/3000 P
2 250/5000 NOTE
1 250/5000 P
1 250/5000 P
2 250/5000 P
1 250/5000 P
N/A NONE N/A
MUD SYSTEM: Light Alarm
Trip Tank OK OK
Pit Level Indicators OK OK
Flow Indicator OK OK
Gas Detectors OK OK
FLOOR SAFETY VALVES:
Upper Kelly
Lower Kelly
Ball Type
Inside BOP
Test
Quart. Pressure
1 250/5000
1 250/5000
2 250/5000
1 250/5000
P
13 250/5000 P
26 250/5000 P
1 25O/5OOO P
1 250/5000 P
2975 PSIG I OK
1700 PSIG I OK
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained 2
Blind Switch Covers: Master:
Nitgn. Btl's: 4
minutes 34 sec
minutes o4 sec
one Remote:
Psig.
Number of Failures 4 Test Time 5 1/2 Hours Number of valves tested 17 Repair or Replacement of Failed
Equipment shall be made withi 1 days. Notify the Inspector on duty and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS: (3) valves on the choke manifold leaked. Valves were greased and retested satisfactorily.
Well sign and kill sheet were missing. They were to be made and posted.
NOTE: Top 3-1/2" x 6" variable ram leaked. The variable ram will be changed to a 7" ram
and retested with a test plug upon pulling of the existing tubing.
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c -Inspector
STATE WITNESS REQUIRED?
YES x NO
24 HOUR NOTICE GIVEN
YES x NO
Waived By:
Witnessed By:
Jerry Herring
H2ESBOP1 .XLT Rev. 1/93
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
January 25, 1993
Michael Zanghi
Drilling Engineer Supervisor
ARCO Alaska, Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit DS 16-4A
ARCO Alaska, Inc.
Permit No. 92-151
Sur. Loc. 1656'FNL, 1078'FWL, Sec. 24, T10N, R15E, UM
Btmnhole Loc. 2463'FSL, 4353'FEL, Sec. 18, T10N, R16E, UM
Dear Mr. Zanghi:
Enclosed is the approved application for permit to redrill the above
referenced well.
The permit to redrill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given
to allow a representative of the Commission to witness a test of BOPE
installed prior to drilling new hole. Notice may be given by contacting
the Commission petroleum field inspector.on the North Slope pager at
659-3607.
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
~z:~ prinled on recycled paper b y O.~.
STATE OF ALASKA -.
ALASK,t L AND GAS CONSERVATION C, MISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] RedrillElllb. Type of well. Exploratoryl-I Stratigraphic Testr-J Development Oil[]
Re-Entry [] DeepenE]I Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool'
ARCO Alaska, Inc. KBE = 72feet Prudhoe Bay Field/Prudhoe
13. Address 6. Property Designation Bay Pool
P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28348
4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(~,,,, 20 ^^c 25.o25)
1656'FNL, 1078'FWL, Section 24, TION, R15E, UM Prudhoe Bay Unit
At top of productive interval 8. Well number Number
2059'FSL, 4423'FEL, Section 18, TION, R16E, UM DS 16-4A U-630610
At total depth 9. Approximate spud date Amount
2463'FSL, 4353 FEL, Section 18, TION, R16E, UM January26, 1993 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVD)
property line
ADL 28332-924"' feet No Close Approachs feet 2560 12381'MD / 9189' TVEfeet
16. To be completed for deviated wells 17. Anticipated pressure (s,,~ 2o AAC 25.035 (e)(2))
Kickoff depth ~o4so'feet Maximum hole angle ~3.43 o Uax~r, urn surface 3330Pslg At total depth (T'VD) 8800'/4390pslg
18. Casing program Setting Depth
size Specifications Top Bottom Quantity of cement
Hole C~tsing Weight Grade Coupling Length M D TVD M D TVD (include stage data)
8-1/2" 7" 26tl ~3cr-~o/ Fox/ 2051' 10330": 7931' 12381' 9189' 462 cuft CI 'G'
NT-80SS NSCC
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 12857feet Plugs (measured)
true vertical 9357feet
Effective depth: measured 12554feet Junk (measured)
true vertical 9337feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor 100' 20" 345 sx ASfl 100' 100'
Surface 2551' 13-3/8" ~zo~x~o~,~,~ 2623' 2623'
Intermediate 11773' 9-5/8" 500 sx CI 'G' 11845' 8880'
Production
Liner 1049' 7" 500 sx CI 'G' 12587' 9357'
Perforation .depth: measured 11910;11'922'
true vertical 9329'-9337'
20. Attachments Filing.fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid program [] Time vs~epth plot [] Refraction analysis• Seabed report[] 20 AAC 25.050 requirements•
21. I hereby certify that,the fore¢oing is true and correct to the best of my knowledge
Signed ~: ~ Title Drilling Engineer Supervisor Date ,'"Z.--~"'-'~'~
-- ~C/./' Commission Use Only
Permit Number IAPI number IApproval date,......-.--~ See cover letter
¢'-2-- -,/,..¢/ 150-oz,¢-.~_o5"~/-~ / J / --'"~,~.~ -'y,...~ Jfor other requrements
Conditions of approval Samples required [] Yes ~No Mud log required []Yes ~ No
Hydrogen sulfide measures [] Yes '1~ No Directional survey required ,~ Yes [] No
Required working pressure for BOPE [] 2M; r-13M; ,~5M; I-]10M; l--115M;
Other:
Origin¢l ~'.',~ned l~,y by order of
A, pproved by David ',,~ ..... ni',.,ston Commissioner tne commission Date ,/-"
Form 10-401 Rev. 12-1-85 Submit in triplicate
'~'ROPOSED REDRILL PROGR .... :
WELL 16-,4A
OBJECTIVE:
The objective is to return the well to production by producing a new target 800' northwest
of the present wellbore. A redrill has been requested since a workover is needed to
repair the tubing leaks, and a more desirable location would more effectively drain the
remaining reserves, i The current wellbore has been plagued with high water production
believed to be associated with near we!lbore faulting.
.
Post-sidetrack production rates are estimated at 2000 BOPD at 50% WC and 800 GOR.
The scope of the 16-4A redrill is to plug and abandon the original perforations, pull the
5-1/2" tubing, mill a 60' section in the 9-5/8", lay a cement plug, kickoff and drill a new 8-
1/2" hole to a target 800' northwest of the present wellbore, run open hole logs, run and
cement a 7" 26# 13CR/L-80 liner, and recomplete.with 4-1/2" CR tubing and a 7" CR
packer.
CURRENT STATUS:
Well 16-4 is curreptly shut-in due to high water production.
The 16-4 well was drilled in 1981 with Rowan #35. The well is conventional design with
9-5/8" casing set at 11,845' MD (about 60' above the top of the Sadlerochit) with 10 ppg
mud. The 7" liner was set at TD with 10 ppg mud.
The well has been plagued with unsuccessful attempts to squeeze off water. A hole in
the tubing at 7591' MD was patched 3/90. In 4/90, another leak was detected deeper in
the tubing string. With pressure on the tubing and the tubing x casing annulus, the well
was plugged in 8/92.
PERMITTING:
A sundry notice covering the plugback of ~the original well was approved on 7-17-92
(apprOval #92-190). The attached drilling permit covers the 'proposed drilling program
for the redrillo
RECEIVED
OEO 2 2 199~
· J, laska OiJ & Gas Cons. ~;ornn~.ission
,Anchorage
~I--'ROPOSED REDRILL PROGR,
WELL 16-4A
~UMMARY PROCEDURE:
·
,
3.
4.
5.
6.
Ca.
7.
.
.
11.
12.
14.
15.
16.
17.
18.
19.
Pre-rig work: Kill well. Lay cement plug across perforations to at least 100' above
top perforation. Cut .5-!/2" tubing at 10.500' MD. Freeze protect.
MIRU workoVer rig. Test intermediate packoff to 3500 psi.
Pull BPV. Circulate out freeze protection fluid.
Set two-way check valve. ND tree.
NU 13-5/8" 5M BOP's. Test BOP's to 5000 psi. Pull two-way check valve.
Pull and lay down 5-1/2" tubing.
RIH w/~-5/~" bridge plug and set at 10,460' MD.
RIH with a 9-5/8" section mill and cut a 60' section in the 9-5/8" casing starting at
+/- 10.250" MD.
RIH with open-ended DP. Mix and pump 180 sacks of cement to spot balanced
kick-off plug from 100' below the base of the section to 200' above the top of the
section. If casing appears uncemented, increase cement volume up to 300 sacks.
Replace intermediate packoff if necessary.
RIH with 8-1/2" steerable drilling assembly and dress off cement to 5' below
section. Kickoff well and directionally drill to align well with target.
Drill with a 8-1/2" packed hole assembly to total depth of 12.342' MD / 7880' TVD
or 150' MD below the OWC at 9102' TVD.
RU wireline and log with the DLL / GR / SP / Sonic / Neutron. Make wiper trip
-depending on hole conditions and logging time.
Run 7" 26# 13CR FOX x 7" 26# L80 NSCC standard liner assembly to TD with
liner top packer and +/- 150' lap. Crossover from 13CR to L-80 at 11.530'.
Cement liner with 392 sacks based on 40% open hole washout, shoe volume, lap
volume, and 200' excess on top of liner with DP.
Clean out liner to PBTD and test to 3500 psi. Test intermediate casing packoff to
3500 psi and replace if necessary.
RIH with .4-1/2" 12,6# 13(;;R~0 TDS / 3-1/2" 9.2# 13CR80 FOX completion string w/
Z" CR packer. Circulate corrosion inhibitor down the annulus. Space out, land
completion, and set packer at 11.630' based on: 200' above the top of the
Sadlero(phit'.
Test down tubing to 4000 psi. Test tubing x casing annulus to 3500 psi.
.Set two-way check valve. ND BOP's. NU and test the 4-1/16" 5M tree to 5000 psi
with diesel. Pull two way check valve. Shear RP valve and freeze protect.
Set BPV. Release rig.
RECEIVED
DEC 2 2 1992
Alaska Oil & Gas Cons. Commission
Anchorage
$-4A Drilling Permit Informi~t
PRELIMINARY WELL PLAN
WELL: 16-4A Redrill P B U
APl No.: 50-029-20561-00 (on the original 16-4 well)
LOCATION:
Surface: 3623' FSL, 4202' FEL, Sec. 24, T10N, R15E
Target: 2059' FSL, 4423' FEL, Sec. 18, T10N, R16E @ 8815' ssTVD
BHL: 2463' FSL, 4353' FEL, Sec. 18, T10N, R16E @ 9119' ssTVD
ESTIMATED START: January 25, 1993
OPR. DAYS TO COMPLETE: 15 (5 days prep & mill, 5 days drill, 5 days complete)
CONTRACTOR: Nabors Rig #2ES
DIRECTIONAL: Kickoff at 10,250' MD. 7 degree angle build and 49 degree north turn.
WELLBORE:
Item
20" CONDUCTOR
13-3/8" SHOE
KOP
TOP SAG RIVER SANDSTONE
TOP SADLEROCHIT
TOTAL DEPTH
TVD(ss) MD(BKB) Mud Wt.
28' 100' N/A
2551' 2623' N/A
7808' 10250' 9.8
n/a n/a n/a
881 5' 11 831' 9.8
9119' 12342' 9.8
LOGGING PROGRAM:
8-1/2" Hole: Gamma Ray / SP / Lateroiog / Neutron / Density
MUD PROGRAM:
-.
The milling/drilling fluid program will consist of a 9.8 ppg XCD polymer / KCI water based
mud in the 8-1/2" hole.
DEPTH DENSITY PV YP INT 10 MIN FL OIL SOLIDS MUD
FFVD~ (PPG) ~'CP~ (#/FT~ GEL GEL cc/30min ~'%1 {'%) TYPE
7880' 9.8 10 10 5 7 6 0 5 Water
to to to to to to to to to Base
9191' 10 16 18 10 15 3 0 7 Mud
DEC 2 2 1992
Alaska Oil & Gas Cons. CornmissJor~
Anchorage
~'-'$-4A Drilling Permit Informat'~ ~_
MUD WEIGHT CALCULATIONS / WELL CONTROL:
Mud Wt. (8-1/2" Hole)' 9.8 ppg.
Est, Pore Press. Sag River:
Est. Pore Press. Sadlerochit:
Sag River not present
3740 psi/8800' ss TVD.
Overbalance Sag River:
Overbalance Top Sadlerochit:
n/a
744 psi.
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular
preventer will be installed and will be capable of handling "worst case" situations as
follows: Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based
upon original reservoir pressure. Maximum possible surface pressure is 3330 psi based
upon a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss.
Fluids incidental to the drilling of a well will be removed by truck and disposed down
.
CC-2A. '
LINER DETAILS:
CASING DEPTH
7" 26# 13CR80 FOX-
11,530' - 12,342' MD
(8001'-9119' ss TVD)
7" 26# NT80SS NSCC
10,100' - 11,530' MD
(7702'-8001' ss TVD)
BURST COLLAPSE TENSILE
7240 psi 5410 psi 604 klbs
7240 psi 5410 psi 604 klbs
CEMENT CALCULATIONS: 7" Liner
Measured Depth'
·
Basis:
10,100' (Hanger)- 12,342' (Shoe)
40% open hole excess, 40' shoe joints, 150' liner lap and 200'
excess above liner with DP.
Total Cement Vol° 462 cuft or 392 sxs of Class G blend @ 1.18 Cu ft/Sk
TUBING
DETAILS-
4-1/2" 12.6# 13CR-80 TDS
3-1/2" 9.2# 13CR-80 Fox
(0'- 10,050' MD)
(10,050' - 11,690 MD)
D EO 2. 2 1992
Aiaska Oil & Gas Cons, 6oraraissiOr~
Anchorage
· 6-4A Drilling Permit Inf¢rma! 3
NABORS RIG NO. 2ES
MUD SOLIDS CONTROL EQUIPMENT
2 - Continental Emsco FIO00 Mud Pumps
1 - Derrick FIoLine Cleaner Shale Shaker
1 - Mud Cleaner
1 - DRECOGas Buster
1 - Pioneer Sidewinder Mud Hopper
1 - 5 HP Flash Mixer Agitator
3 - Abcor 10 HP Agitators.
1 ~ 50 bbl. Trip Tank
1 - Recording drilling fluid pit level indicator with both visual
and-audio warning devices at driller's console.
1 ~ Drilling fluid flow sensor with readout at driller's console
LAND DIRECTIONAL DRILLING,
Corporate Office
111i ~a~t 80th Avenue
Anchorage, AK 99518
(907) 349-4511 Fax 349-2487
DIRECTIONAL WELL PLkN for PRUDHOE BAY DRILLING
Well ......... : DS 16-4A (P3) Prepared ..... :
Field ........ : PRUDHOE BAY DRILL SITE 16 Section at...:
Computation..: MINIMUM CURVATU~ . Y~ elevation.:
LEGAL DESCRIPTION
Surface ...... : 3623 FSL 4202 FEL S24 TiON R15E UM
Tie-in ....... : 978 FSL 4878 FEL 818 T10N R16E UM
Target ....... : 2059 FSL 4423 FEL S18 T10N R16E UM
BHL .......... : 2463 FSL 4353 FEL $18 T10N R16E UM
X ASP ZONE 4 Y
719861.00 5929290.00
724182.71 5932052.24
724600.68 5933146.28
724656.92 5933552.66
i~/i4/92
9.57
72.00
PROPOSED WELL PROFILE
STATION M~AS .~INCLN VERT-DEPTHS
IDENTIFICATION DEPTH AN~LE BKB .SUB-S
..
TIE-IN
K-10
10250 46.54 7880 7808
10300 46.35 791~ 7842
10400 46.17 7983 7911
10427 46.19 8002 7930
10500 46.25 8052 7980
SECT
.
DIST
3329
3354
3406
3422
3464
DIRECTION 'REL-TOORDIN~'TEs 'DL/
AZ IMUTH FROM-WELLHEAD 100
58.25 2634 N ' 4401 E <TIE
55.50 2654 N 4432 E 4.0
49.97 2698 N 4489 E 4.0
48.46 2710 N 4504 E 4.0
44.43 2747 N 4542 E 4.0
K-5
10600 46.61 8121 8049
10700 47.22 8190 8118
10800 48.08 8257 8185
10900 49.17 8323 8251
10986 50.31 8379 8307
3528
3590
3659
3731
3796
38.93 2801 N 4590 E 4.0
33.52 2860 N 4633 E 4.0
28.23 2923 N 4671 E 4.0
23.10 2991 N 4704 E 4.0
18.83 3052 N 4727 E 4.0
SADLEROCHI T
TARGET
11000 50.49 8388 8316
11100 52.01 8450 8378
11184 53.43 8501 8429
11831 53.43 8887 8815
11831 53.43 8887 8815
3806
~3883
3950
4470
4470
18.16 3062 N 4730 E 4.0
13.41 3137 N 4752 E 4.0
9.57 3203 N 4765 E 4.0
9.57 3715 N 4851 E 0.0
9.57 3715 N 4851 E 0.0
ZONE 3
ZONE 2
_.
OWe
TD
11848 53.~3 8897 8825
11946 53.43 8955 8883
12192 53.43 9102 9030
12342 53.43 9191 9119
4484
4562
4760
4880
9.57 3729 N 4854 E 0,0
9.57 3806 N 4867 E 0.0
9.57 4001 N 4900 E 0.0
9.57 4120 N 4920 E 0.0
Alaska Oil & ~as Cons,
Ar~chora~e
· .'GLDD (c)92 DS~6~A B1.~6 11:O& A~ ~)
PRUDHOE
Marker Identification HO BKB SECTN INCLN
A} TIE-IN ~0~50 7680 3329 46.5~
B) ENO OF 6URVE 1~84 850~ 3950 53,~3
C) TARGET 12831 BBB? ~70 53,43
D) TD 12342 9191 4880 53,43
3000 3 ! 50 3300 3450 3600 3750 3900 4050
Section DsDaptuPe
Ic,)~8' DS~6~ ~i:1,3§ 10: 5J AN 2J
BAY DRILLING
DS 16-4A (P3)!
VERTICAL SECTIO.~ ~VC__F~. V~d
Section at:
TVD Scale.:
Oep Scale.:
Of'awfl .....
9.57
~nch -- 300 feet
~nch
300,4fa~'*"~ oi~ & 6~s Cons, ComrF
12/~4/92
Anchora,qe
$~eat Land
~200 ,4350 4500 4650 41300 4950 51 O0
'- -r
'-PRUDHOE BAY--
ENO OF CURVE I,,84 3203N 4765E
TARGET ,,B3i 37,5N 485, E
TO 12342 4,20N 4920E
3RILLING
DS 16-4A (P3)
PLAN VIEW
CLOSURE ' 6417 ft at Azimuth 50.06
DECLINATION.' 30.28 E
SCALE · I inch = I000 feet
DRAWN ' 12/~4/92
Aias~'Oii a G~s Co.s, Oom~S:, ;~¢rea t Land Direct j ona l. DrY ] ] f ng
"q-' i"F':i"_' :"" ' '" "'' '~ ~ '"
, ,,,, iii"" 1, ,,,...,,,, ,,,,
,,~," ,-, ~,' ,~ ,,, ,,~,'-"' -? ........... :t:l'q't'-,,~. : :::F 't't.'J.+-¥-.-~l-
) i' F-~ i'f i f f -i-i"~ '--fT t'-
I~i' ~t,it~ i~ ,iii ~'-FTi-F'"k'!i't" t'f"r'~:i,~ ,, ~.~ ,,. ,,, ,,,~ ,.
II ii :Il I Ii ~ ,Ii; ,! I Jill I Il I !l I11
iii 'l!!li IlJj i I-II I~ i I i i It ~ I I I I i iii[
~ ~ I } ~ ~ ~.J~t LI ~ ~j ~ ~ ~ ~ i t I I I ~ ~ ~ ~ ~ ~ i ~ ~I i I J i ~ ~ ~ i-: '
J i I I i I ii ~ ~t i I ~. I i ~' i
J } jj I ! I I ~ I i t J [ J ~~ I I lil~
t ~ I I , ~ ~ I i ~ ~ ~ t I I ~ ~ , ~ i-i [~'1'~ .... : '
,,~ ,,,,~ ,,,~ ,,,, , ,,~,,,r-.t-..:-I.-''''~ j'
!,~ ,,.... ~..~ , ,~l ; t~~- , ,
1 I I J i J I [J 'i"' ' ~ I I t i~ ,
i I I i j I t ' I i ' ..... ill
' '. ..... ',i ~'i i~ titl
J t i! iilJ I i s i i I i iii
' ! l! iI,l Il I I, ii ,,, ,,,, i ~ 1 t I t
~ ; ' ' . ' ' . .
~ ~ ~' ~'~ ~ ~ --- ' !! ,~l ~ t III
I
1/
I
- ' .... ~-4"';'-- '~ 14~ --I ii '~' }'
..,, , .,, ,,
~,., ~ , ,-iJ i t ~= , ,,·. . . i ,,_
..J...I I I l i_- l ii Iii i lq'T' I
' ¢,- , ,, ,' , ,,,~ ~ · ,~ ~ ~, -.~ .... ~+~.
Il~ 1 I'll. , , , ~ ~ ,~, ~, ,, " I ,~' '" ~~", ,
!lt .....
' i i i ~ ~ I.,.I I i .4'! ~ 'T"['I i I , I i ! ~ .
.... ,i ''""~'~"~'~ ~' ~' ~ ~'1
, , . = I ; ~ i ~ ~ I
I , I ' I ' ~ , i Iii, lit,' Li 't +
i j I I i i J I"¢'
_ I 'Tr:"f i~;-?'~ t.[ ~i ii i ''¢i iiIl i~11~ I, 111 il , i[ " "] ......... '
~L.2J_ I i /ri i ~ i ~ '~ ~ ~' ~ ' ~ ~ ~ t' ~ ~ ~ i ..... f' . ' '
~"'~!!1"1' i~~ ~' ' "''~"~'-~4~"~
t I I i ~ ; .] ; !~ t I ; ~ I i ~ ! I ~ ~ I I ~ I I I J , I J '
illI IJ'i 'i! ..] ~ , i .i, .... ~J! ; . ,,
500 0 500 JO00 :[500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500
<- I~EST · EAST ->
i ·
~e I~.~C,~ ,BJ .~ Ao:' 5~, ~ ~) .......
Spud Date' 02-27-81
Original RKBE: 72'
'~'C_ Alaska Inc. - Prudhoe Bc-~'~', .d
APl#: 5OO29-~1~ Well Type: Producer
Completion Date' 03-25-81 New [] Workover 1-1
Hanger Type: Gray Hanger: 27'
)p of Sadlerochlt: 11948' Maximum Hole Angle: 56~ Angle Through Sad.' 51~
~u'~nulusRuid: Diesel/9.4# NaCI Reference Log: BHCS 03-19-81
All Depths are RKB Drilling MD to Top of Equipment except where noted.
Annular Communication: Patch across 3rd GLM leaks. Well S/I waiting on RWO,
Jewelry
1 2212'
2 7506'
3 11460"
4 11476'
5 11487"
6 11573'
7 11575'
8 11576'
11,566'
14 9816'
Tag Cement
@11126' 9
10
3 11
4
5
5-1/2" Offs RQM SSSV Nipple ID=4.562"
Merla Patch ID=3.750"
Baker PBR Assembly
Baker SAB Packer
5-1/2" x 4-1/2" Crossover
Otis XN Nipple ID--3.725"
Baker Shear Out Sub
4-1/2" Tubing Tail
ELM Tubing Tail (Logged 00-10-81)
Hole in Conar above 5th GLM (04-28-90)
r.,,EC ,_ !.~,9~.
.AJaska iJit & G~l~-; Cons. CornKti$
nc'
Minimum ID: Offs XN Nipple ID=3.725"
Casing and Tubing
Size Welaht Grade T.gJZ Boffom
13-3/8" 72# L-80 0' 2623'
9-5/8" 47# L-80 0' 11845'
7' 29# L-80 11538' 12587'
5-1/2" 17# L-80 O' 11487"
4-1/2' 12.6# L-80 11487" 11576'
Descrl~lon
Casing
Casing
liner
PC Tubing
PC Tubing Tail
6 12
7,8
10
13
-~.
Gas Uff Information (Valve Change Date: 03-12-90)
MD TVD ~ Mandrel VIv Type
2868 (2868') 1 aT MC VR-STD
5253' (4803') 2 aT MC VR-STD
7521' (6128') 3 aT MC VR-D
9058' (7053') 4 aT MC VR-STD
9835' (75873 5 aT aT RD
99(]9' (7640') 6 aT aT RD
10,.,'.,'.,'.,'.,'.,~6' (7973') 7 aT aT RD
10464' (8025) 8 aT aT RD
10837" (82693 9 aT aT RD :
10913'(8318") 10 aT aT RD
111617 (8470") 11 aT aT RD
11237' (8518') 12 aT MC VRSO
May have RA Latches -,
Latch Po~Sz. TRO Date
RO-5 1/4' 1~0
RO-5 1/4" 1640
RO-5 w/tbg patch
RO-5 5/16" 1745
RO-5*
RO-5*
RO-5*
RO-5*
RO-5*
RO-5*
RO-5
RO-5 7/16" ORIF
Perforation D~a (ELM-Depths)
~ ~ FT SPF
13' 11910-11922 4 12 0
11950-1~ 3 50 0
1233G12070 3,2 43 0
Comments
Peff Abandonment
Perf Abandonment
Perf Abandonment
11
PBTD =
TD=
12554'
12587'
Datum
8700' SS = 11645' MD
8800' SS = 11804' MD
Revision Date: 08-19-92 by ENH
Reason' Perf Abandonment/PRE ST
Previous Revision: 11-11-90
General Purpose Worksheet
lSubject
File
JPage No.
O!
=--.. qyj Iz.G~
Alas.ka Oii & Gas Cons, Cornr;'fisskm
Anc~ora~
- .,
!
AR3B-6287
NABORS 2ES
~515'
4.95'
4.37'
4.85'
1.68'
1.88'
1.50'
2.17'
1.42'
GROUND LEVEL
13 5/8" 5,000 psi Stack
KB TO BF
!
DRIP PAN
HYDRIL
12.19'
PIPE RAM
BLIND RAM
16.37'
MUD
CROSS
PIPE RAM
22.20'
24.68'
I
I
MUD
CROSS
1
TBG
SPOOL
J
26.85'
28.25'
._-
COMPARTMENT CAPAC~F~
C O I,U~RTMEHT BBLS
: O .S~UM( E,I:UD E GA ..~SER TANK 170
;~MUO C..LEA. NE~ TANK 175
~JCTION TANK 180
) PIU,. TAN~ 60
INJ~'T'K:)N TAN~ 245
TA~
4~2~ BB~ ~
HOLDING TANK
CONVEYOR
BRINE TANK~
BOIb STAC:~ - 13~/8 ~ .
i~TH~,J C,N(~I TO F3.O'Wt.~E
LEGEND
Itl -U'r'rER~LY VAL~
[~ ~U~N VAlVe'
~ EOUAUZ~R
OAGITATOR
MUD SYSTEM FLOWSI-EET
'~- .1~ DWI( rr ' - er ;
State: Alaska
Borough:
Well: DS 16-4A
Reid: Prudhoe Bay
SI. Perm; 92-151
Date 1/18/93
Engr: M. Minder
D S 16-4A.XLS
Casing Interval interval
Size Bottom
Description)esoription)escription Tension
Top Length
lA 7 9191 7774 2242
2A 0 0 0 0
8A 0 0 0 0
4A 0 0 0 0
5A 0 0 0 0
6A 0 0 0 0
7A 0 0 0 0
8A 0 0 0 0
9A 0 0 0 0
10A 0 0 0 0
Lbs Grade Thread Lbs
26 13CR-80 FOX 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
18
2B
4B
5B
7B
8B
9B
1 OB
Mud Hydraulic Collapse
Wieght Gradient Gradient
ppg psilft psi/ft
9.8 0.510 0.410
0.0 0.000 -0.1 O0
0.0 0.000 -0.100
0.0 0.000 -0.I 00
0.0 0.000 -0.100
0.0 0.000 -0.100
0.0 0.000 -0.i00
0.0 0.000 -0.1 O0
0.0 0.000 -0.1 O0
0.0 0.000 -0.1 O0
Maximum Minimum
Pressure
psi
4390
0
0
0
0
0
0
0
0
0
Yield
psi BDF
7240 1.6
0 #DIVi0!
0 flDIVi0!
0 #DIVI0!
0 #DIV!O!
0 #DIV/O!
0 #DIViO!
o #DIViO.I
0 #DlViO!
0 #DIM/O!
1C
2C
3C
4C
5C
6C
7C
8C
9C
10C
Tension Strength
K/Lbs
58.292
0
0
0
0
0
0
0
0
0
K/Lbs TDF
604 10.86
0 #DIVIO!
0 #DIVI0!
0
0 #DIVt0!
0
0
0 #DP/lO!
0 #DIV~O!
0
Collapse Collapse
Pr-Bot-Psi
;3765
0
0
0
0
0
o
0
0
0
Resist. C. DF
5410 1.4,37
0 #DiV/0~
0 #DP/10!
0 #DiVi0!
0 #DIVI0~
0 #DIVI0!
0 #DP/10i
o #DIV/O!
0 #DIVIO!
0 #DIM/O!
18-4ACMT.XLS
State:
Well:
Field:
State Permit
DS16-4A
Prudhoe Bay
92-1,51
Engineer:
Work Sheet:
Date:
£emenl ~ {~lurn~ £aic~¢lalion.~
1/1~,,/.¢$
Casing Type
Casing Size -Inches
Casing Length - Feet
Hole Diameter -Inches
Cement- Sacks
Cement-Yield
Cement- Cubic It
Cement- Cubic It
Cement- Sacks
Cement-Yield I:t2
Cement- Cubic tt
Cernent - Cubic tt ~t2
Cement- Sacks
Cement-Yield ~3
Cement- Cubic tt:!:13
Cement- Cubic ItI:13
Cement- Cubic ft / Vol
Cement- Fill Factor
Conductor
0. O00
0.080
0.008
0.080
0.000
0.000
0.080
O. OOO
0.008
0.000
0.000
O. OOO
~DIV/O!
Surface
0.000
O. OOO
0.008
O. O00
0.008
O. O00
0.080
0.080
0.000
0.080
0.080
O. OOO
0.008
0.000
0.080
0.000
~DIV/0!
Liner
7.000
2,242.000
8.500
0.000
0.008
0. O00
482.000
0.000
0.000
0.000
0.000
462.000
1.625
Casing Type
Casing Size -inches
Casing Depth- Feet
Hole Diameter -Inches
Cement- Sacks
Cement- Yield ~il
Cement-Cubic it
Cement- Cubic it
Cement-Sacks ~12
Cement- Yield
Cement- Cubic ft ~f2
Cement- Cubic it
Cement-Sacks ~3
Cement-Yield I:i3
Cement- Cubic ft ~3
Cement- Cubic fl
Cer.,~nt - Cubic it /Vol
Cement-!nte~va! ft
Top ct Cement- Feet
Intermediate ~1
0.000
0.000
0.000
0.00
0.08
0.00
0.00
0.00
0.00
0.00
0.08
0.08
0.08
0.08
0.00
0.08
~DIV/O!
;~DIV/O!
Intermediate ~I2
0.080
0.000
0.008
0.00
0.~
0.08
0.00
0.00
0.00
0.00
0.00
0.08
0.00
0.00
0.08
0.00
~IDIV/0!
~DIV/O!
Production
0.000
O. O00
0.080
0.00
0.00
O. O0
0.00
0.08
0.00
0.00
0.00
0.00
0.08
0.00
0.00
0.00
~DIV/0!
I:I:DIV/0!
Mea. suI ed Depth
APPL,..ATION PUff ' ',
1. Type of Requesl:
Abandon x Suspend , Operation Shutdown Re-enter suspended well r
Alter casing ~ Repair well~ Plugging x. Time extension ~ Stimulate ,
Change approved program ,. Pull tubing ~ "- Variance .... ~erforate ~ Other x
__ Plugback for Redrtll
2. Name of Operator
ARCO Alaska,/nc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1656'SNi., I078'EWL, SEC. 24, TION, R15E, UM
At top of productive interval
1687'NSL, 1469'EWL, SEC. 18, TION, RI6E, UM
5. Type of Well:
Development ~ x
Exploratory ~
Stratigraphic ~
Set, ce
RECEIVED,
6. Datum elevation (DF or KB)
KBE- 72 feet
7. Unit or Property name
Prudhoe Bay Unit
d U L 1 6 1992
At effective depth 10.
1860' NSL, 1742' EWL, SEC. 18, TION, R16E, UM Alaska Oil & Gas Cons. Commission
8. Well number
DS 16-4
9. Permit number
81-20
APl number
50- 029-20561
At total depth
1870'NSL, 1875'EWL, SEC. 18, TION, R16E, UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Anchorage
12857 feet Plugs (measured)
9357 feet
12554 feet Junk (measured)
9337 feet
11. Field/Pool
Prudhoe Bay Field~Oil Pool
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length
Size Cemented
100' 20"
2551' 13-3/8"
11773' 9-5/8"
1049' 7"
measured 11910'-11922'
Measured depth
True vertical depth
345 sx AS fl 100' 100'
2700 sx Fondu & 2623' 2623'
400 sx Permafrost
500 sx Class "G" 11845' 8880'
500 sx Class "G" 12587' 9357'
true vertical 12554'-9337'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PC T @ 11487'MD; 4-1/2", 12.6tt, L-80, PC Ttail @ 11576'MD
Packers and SSSV (type and measured depth) Baker SABpacker@ 11476'MD; 5-1/2", Otis RQM SSSV @ 2212'MD
13. Attachments Description summary of proposal x Detailed operations program BOP sketch
14. Estimated date for commencing operation
7//~20/92
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil x Gas
Suspended
Service
17. I hereby certify th~ the,,~fore~ping is true and correct to the best of my knowledge.
ined )~.~~~' Title Drilling Engineer Supervisor
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test Location clearance ~
Mechanical Integrity Test~ subsequent form required 10- z//)~
Original Signed By
Approved by order of the Commission D avi d W. Johnston
Date'7- r~'
I Approval No.
.~pproveiJ Cupy
Returned
Commissioner Date
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLIC,
CHECK LIST FOR NEW WELL PERMITS **
ITEM APPROVE DATE
( 1 ) Fee ~/mc /?~//~_~/~
( 2 ) Loc ,/k~. //~//~ ~//~
[-2 thru 8']
I!
2.
3.
4.
5.
6.
7.
( 3 ) Ad m i n [~]p~ //~_/2~. ?/q~ 9.
[ 't ru 13] ~'' 10.
[10 & 13] 12.
13.
[14 thru 22] 15.
[23 thru 28]
(5) BOPE
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
c 6) - 9.
[29 thru 31] 30.
31.
(7) Contact 32.
[32]
(8) Addl '"~'<~.'.F"~. /-~a- ~ 33.
enq ineer ing'
BE~dDH ~
geo 1 ogy'
RPCA m4
rev 12/92
jo/6.011
Company /~r ,~
- I --
Lease S Well
YES NO R~EMARKS
Is permit fee attached ...............................................
Is well to be located in a defined pool ..............................
Is well located proper distance from property line ...................
Is well located proper distance from other wells .....................
Is sufficient undedicated acreage available in this pool .............
Is well to be deviated & is well bore plat included ...................
Is operator the only affected party ..................................
Can permit be approved before 15-day wait ............................
Does operator have a bond in force ................................... ~.
Is a conservation order needed .......................................
Is administrative approval needed ....................................
Is lease nL~nber appropriate .......................................... ~
Does well have a unique name & nLmber ................................
Is conductor string provided .........................................
Wil
to
Is
Wil
Wil
Wil
1 surface casing protect al 1 zones reasonably expected
serve as an underground source of drinking water ..................
enough cement used to circulate on conductor & surface ............
1 cement tie in surface & intermediate or production strings ......
1 cement cover all known productive horizons .....................
1 all casing give adequate safety in collapse, tension, and burst.
well to be kicked off from an existing wellbore ................... ~x~F
old wellbore abandonment procedure included on 10-403 ............. /~
adequate wel lbore separation proposed ............................. /x~/~(.
Is
Is
Is
Is a diverter system required ........................................
Is drilling fluid program schematic & list of equipment adequate .....
Are necessary diagrams & descriptions of diverter & BOPE atcached ....
Does BOPE have sufficient pressure rating -- test to ~'~r~o psig .....
Does choke manifold comply w/API RP-53 (May 84) ......................
Is presence of H2S gas probable ......................................
FOR EXPLOP~ATORY & STRATIGRAPHIC WELLS:
Are data presented on potential overpressure zones ...................
Are seismic analysis data presented on shallow gas zones .............
If offshore loc, are survey results of seabed conditions presented...
Name and phone nL~ber of contact to supply weekly progress data ......
Additional
requirements .............................................
Additional
INITIAL GEOL UNIT ON/OFF
POOL CLASS STATUS AREA ~ SHORE
remarks'
MERIDIAN' UM ~
SM
Exp/Dev ~
WELL TYPE' Redrill
Inj
Rev
,,
0
-rz
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history' file.
To improve the readability of the Well History file and to
simp[ify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
ARCO ALASKA INC
D.S. 16 - 4A
PRUDHOE BAY
MAP, ~5
:Alaska Oil & Commission
lC- OJ lt
Date
Run 1'
19 - February - 1993
MLL/DLI./AClGR
10193
12380
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
D.S. 16 - 4A
500292056101
ARCO ALASKA INC.
ATLAS WIRELINE SERVICES
01-MAR-93
RECEIVED
MAR 1 9 199b
RUN2 RUN3
RUN1
5898.00
DALE CAIN
M. WILSON
52.00
51.00
17.00
24
10N
15E
Alaska Oil & Gas Cons. CommissiQI1
Anchorage
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING 9.625 10207.0
PRODUCTION STRING 8.500 12383.0
REMARKS: MLL/DLL/AC/GR
TOOL STRING CENTRALIZED WITH 8" GEMCO CENTRALIZERS.
TOOL STRING STUCK AT 12222. PULLED 7000 LBS. TO GET
FREE. DATA FROM 12222 TO 12118 WAS SPLICED FROM DOWN
PASS AS MAIN PASS DATA WAS NOT RECORDED DUE TO CLOSED
CALIPER TRYING TO GET TOOL UN-STUCK. ACOUSTIC DATA
FROM 12240 TO 12190 WAS MISSED BY BOTH MAIN & DOWN
PASSES.
DATA MAY BE STRETCHED AT TIGHT SPOTS IN THE HOLE.
AC NOISE IS FROM TOOL STICKING DUE TO HOLE CONDITIONS.
MAIN PASS WAS RUN FROM T.D. TO 11700 & THEN A SECTION
FROM 10500 UP TO CASING WAS RECORDED. THE UPHOLE
SECTION WAS CHECKED AGAINST REPEAT PASS. HOLE
CONDITIONS WERE SUCH THAT THE REPEAT PASS WAS RECORD-
ED AT THE CASING SHOE AS PER CUSTOMER REQUEST.
THE REPEAT PASS WAS STICKING AND HAD TO BE LOGGED
FASTER THAN THE MAIN PASS.
NOTE: GAMMA RAY AND AUXILLARY CURVES WERE RECORDED
FROM T.D. TO CASING.
$
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings; depth shifted and clipped curves;
hole data.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
BHC
DLL
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA
0.5000
START DEPTH STOP DEPTH
10193.0 12337.0
10193.0 12357.0
10193.0 12380.0
GR
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH DT MLL LL3 LLD
10193.0 10193.0 10193.0 10193.0 10193.0
10200.5 10200.5
10226.5 10226.5 10226.5 10226.0 10226.0
10238.0 10238.0
10244.5 10245.0
10290.0 10290.0
10306.5 10306.5
10316.5 10316.5
10317.0 10316.5
10330.0 10330.0
10347.5 10347.5
10366.5 10366.5
10392.5 10391.0
10397.0 10396.5
10401.5 10401.5
10402.0 10401.5
10408.0 10408.0
10408.5 10408.5
10412.0 10412.5
10412.5 10413.0
10428.0 10427.0
10432.5 10432.5
10458.5 10458.5
10469.5 10469.5
11694.5 11694.5
11707.0 11706.5
11714.5 11714.0
11722.0 11721.5
11733.0 11733.0 11732.5
11734.0 11733.5
11737.5 11738.5
11739.5 11739.5 11739.5
11740.0 11739.5
11746.5 11748.0
11749.5 11750.0
11752.5 11752.5
11781.5 11781.0
11786.5 11786.0
11787.5 11787.5
11797.5 11797.5
11819.0 11819.0
all runs merged;
no case
11820.0
11820.5
11822.0
11828.0
11830.5
11883.0
11883.5
11886.5
11900.5
11901.0
11914.5
11933.0
11939.0
11953.0
11977.0
11977.5
11978.0
12002.5
12003.0
12036.5
12042.5
12057.5
12075.0
12098.0
12140.5
12149.5
12160.5
12164.0
12164.5
12167.5
12171.0
12182.5
12188.0
12191.5
12201.0
12215.0
12216.0
12241.0
12241.5
12253.5
12273.0
12303.5
12304.0
12316.0
12400.0
$
MERGED DATA SOURCE
PBU TOOL CODE
GR
BHC
DLL
$
REMARKS:
11822.5
11820.0
11820.5
11829.0
11830.5
11883.0 11883.0
11883.5
11886.5
11899.5 11900.0 11901.0
11901.5
11914.5
11932.5
11939.0
11953.0
11977.0
11977.5
11978.0
12002.5
12003.5
12036.0
12041.5 12043.0
12057.0
12075.0
12097.5
12139.5
12148.5
12160.0
12162.0 12162.5
12165.0
12167.5
12170.0
12182.0
12188.0
12191.5
12200.5
12216.5
12217.0
12241.5
12240.0 12241.5
12252.0
12273.0
12303.5
12304.0
12315.5
12400.0 12400.0 12400.0 12400.0
RUN NO. PASS NO. MERGE TOP
1 3 10193.0
1 3 10193.0
1 3 10193.0
MERGE BASE
12337.0
12357.0
12380.0
OPEN HOLE MAIN PASS.
TENS & TEND WERE SHIFTED WITH DT.
CALl & MTEM WERE SHIFTED WITH MLL.
SP WAS SHIFTED WITH LLD.
THERE IS NO BHC OR DLL DATA BETWEEN APPROXIMATELY
10495' & 11695'.
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 16 - 4A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
10 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR BCS 68 1 GAPI 4
2 DT BCS 68 1 US/F 4
3 TEND BCS 68 1 LB 4
4 TENS BCS 68 1 LB 4
5 MLL DLL 68 1 OHMM 4
6 LL3 DLL 68 1 OHMM 4
7 LLD DLL 68 1 OHMM 4
8 SP DLL 68 1 MV 4
9 MTEM DLL 68 1 DEGF 4
10 CALl DLL 68 1 IN 4
4 67 465 06 6
4 84 653 71 5
4 20 789 90 0
4 20 789 90 0
4 30 739 95 0
4 30 739 95 0
4 30 739 95 0
4 30 739 95 0
4 30 739 95 0
4 30 739 95 0
40
* DATA RECORD (TYPE# 0) 1018 BYTES *
Total Data Records: 192
Tape File Start Depth = 12400.000000
Tape File End Depth = 10193.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 48566 datums
Tape Subfile: 2 374 records...
Minimum record length: 62 bytes
Maximum record length: 1018 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 10029.0 10193.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH --
BASELINE DEPTH
$
REMARKS:
CN
WN
FN
COUN
STAT
CASED HOLE MAIN PASS.
$
: ARCO ALASKA INC.
: D.S. 16 - 4A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
3 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH GR 68 1 GAPI 4
2 TEND GR 68 1 LB 4
3 TENS GR 68 1 LB 4
4 21 990 60 6
4 10 579 41 1
4 10 579 41 1
12
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10193.000000
Tape File End Depth = 9976.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 1741 datums
Tape Subfile: 3 32 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
1
1
3
0.2500
VENDOR TOOL CODE START DEPTH
GR 10029.0
AC 10192.0
DLL 10183.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
12346.0
12366.0
12389.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
TEMP
PCM
MIS
DLL
GR
MIS
AC
KNJT
KNJT
MLL
$
CABLEHEAD TENSION
TEMPERATURE
PULSE CODE MODULATOR
MASS ISOLATION SUB
DUAL LATEROLOG
GAMMA RAY
MASS ISOLATION SUB
BHC-ACOUSTILOG
KNUCKLE JOINT
KNUCKLE JOINT
MICRO LATEROLOG
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
19-FEB-93
FSYS REV. J001 VER. 1.1
0
639 19-FEB-93
12383.0
12382.0
10020.0
12380.0
1500.0
TOOL NUMBER
3974XA
2806XA
3506XA
3967XA
1229XA
1309XA
3967XA
1609XA/1603XA
3921XA
3921XA
1233XA
8.500
10207.0
10193.0
A ATM llC
9.90
63.0
9.0
6.0
169.0
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
0.128
0.052
0. 118
0.000
0. 197
0.000
68.0
169.0
68.0
0.0
68.0
0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
0.00
0.000
TOOL STANDOFF (IN):
0.0
REMARKS:
MAIN PASS.
THERE IS NO BHC OR DLL DATA BETWEEN APPROXIMATELY
10495' & 11695'.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 16 - 4A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
18 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
GR AC 68 1 GAPI 4
AC AC 68 1 US/F 4
ACQ AC 68 1 4
TlR1 AC 68 1 US 4
TlR2 AC 68 1 US 4
T2R1 AC 68 1 US 4
T2R2 AC 68 1 US 4
CHT AC 68 1 LB 4
TTEN AC 68 1 LB 4
SPD AC 68 1 F/MN 4
RMLL MLL 68 1 OHMM 4
RS DLL 68 1 OHMM 4
RD DLL 68 ~1 OHMM 4
ED DLL 68 1 MV 4
ID DLL 68 1 A 4
SP DLL 68 1 MV 4
TEMP DLL 68 1 DEGF 4
CAL DLL 68 1 IN 4
4 06 969 49 6
4 48 852 89 1
4 81 285 47 0
4 81 285 47 0
4 81 285 47 0
4 81 285 47 0
4 81 285 47 0
4 95 558 30 1
4 95 558 30 1
4 61 094 30 1
4 71 857 46 1
4 40 514 81 0
4 39 859 45 0
4 30 739 95 0
4 30 739 95 0
4 23 415 80 5
4 84 503 82 1
4 44 339 70 5
72
* DATA RECORD (TYPE# 0)
Total Data Records: 746
994 BYTES *
Tape File Start Depth = 12400.000000
Tape File End Depth = 9976.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 232810 datums
Tape Subfile: 4 828 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
1
1
4
0.2500
VENDOR TOOL CODE START DEPTH
GR 10156.0
AC 10156.0
DLL 10156.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
10502.0
10522.0
10540.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
TEMP
PCM
MIS
DLL
GR
MIS
AC
KNJT
KNJT
MLL
$
CABLEHEAD TENSION
TEMPERATURE
PULSE CODE MODULATOR
MASS ISOLATION SUB
DUAL LATEROLOG
GAMMA RAY
MASS ISOLATION SUB
BHC-ACOUSTILOG
KNUCKLE JOINT
KNUCKLE JOINT
MICRO LATEROLOG
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
19-FEB-93
FSYS REV. J001 VER. 1.1
0
740 19-FEB-93
12383.0
12382.0
10020.0
12380.0
1500.0
TOOL NUMBER
3974XA
2806XA
3506XA
3967XA
1229XA
1309XA
3967XA
1609×A/1603XA
3921XA
3921XA
1233XA
8.500
10207.0
10193.0
A ATM llC
9.90
63.0
9.0
6.0
169.0
0.128
68.0
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: REPEAT PASS.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INCORPORATED
: D.S. 16 -4
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
0.052 169.0
0.118 68.0
0.000 0.0
0.197 68.0
0.000 0.0
0.00
0.000
0.0
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
18 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR AC 68 1 GAPI
2 AC AC 68 1 US/F
3 ACQ AC 68 1
4 TlR1 AC 68 1 US
5 TlR2 AC 68 1 US
6 T2R1 AC 68 1 US
7 T2R2 AC 68 1 US
8 CHT AC 68 1 LB
9 TTEN AC 68 1 LB
10 SPD AC 68 1 F/MN
11 RMLL DLL 68 1 OHMM
12 RS DLL 68 1 OHMM
13 RD DLL 68 1 OHMM
14 ED DLL 68 1 MV
15 ID DLL 68 1 A
16 SP DLL 68 1 MV
17 TEMP DLL 68 1 DEGF
18 CAL DLL 68 1 IN
4 06 969 49 6
4 48 852 89 1
4 81 285 47 0
4 81 285 47 0
4 81 285 47 0
4 81 285 47 0
4 81 285 47 0
4 95 558 30 1
4 95 558 30 1
4 61 094 30 1
4 62 614 26 5
4 40 514 81 0
4 39 859 45 0
4 30 739 95 0
4 30 739 95 0
4 23 415 80 5
4 84 503 82 1
4 44 339 70 5
72
* DATA RECORD (TYPE~ 0)
Total Data Records: 121
994 BYTES *
Tape File Start Depth = 10548.000000
Tape File End Depth = 10156.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
31553 datums
Tape Subfile: 5
199 records...
Minimum record length:
Maximum record length:
62 bytes
994 bytes
Tape Subfile 6 is type: LIS
93/ 3/ 2
01
**** REEL TRAILER ****
93/ 3/ 3
01
Tape Subfile: 6 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Wed 3 MAR 93 11:59a
Elapsed execution time = 1 minute , 3.4 seconds.
SYSTEM RETURN CODE = 0