Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-004 " STATE OF ALASKA �LASKA OIL AND GAS CONSERVATION COMMIs� REPORT OF SUNDRY WELL OPERATIORS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate ❑ Alter Casing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well ❑ Re-enter Susp Well 0 Other: ❑ 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-004 3. Address: P.O.Box 196612 Anchorage, Development IBJ Exploratory ❑ AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21806-01-00 7. Property Designation(Lease Number): ADL 028284 8. Well Name and Number: PBU H-28A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 13150 feet Plugs measured 13107,13112 feet RECEIVED true vertical ' 9004 feet Junk measured None feet Effective Depth: measured 13107 feet Packer measured 10906 feet AUG 17 2017 true vertical 9005 feet Packer true vertical 8245 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 32-112 32-112 0 0 Surface 2787 13-3/8" 31-2818 31-2684 5020 2260 Intermediate 11192 9-5/8" 29-11221 29-8450 6870 4760 Liner 452 7" 10958-11410 8279-8571 8160 7020 Liner 2449 2-3/8" 10701-13150 8116-9004 11200 11780 Perforation Depth: Measured depth: 12506-13085 feet True vertical depth: 9010-9006 feet Tubing(size,grade,measured and true vertical depth) 5-1/2"17#x 4-1/2"12.6#L-80 27-11012 27-8314 Packers and SSSV(type,measured and 4-1/2"TIW HBBP Packer 10906 8245 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Q� t�i�} 0 Treatment descriptions including volumes used and final pressure: SCANNED N O V 2 2017, 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 244 9025 58 1845 195 Subsequent to operation: 254 9276 58 1828 197 14.Attachments:(required per 20 MC 25 070.25 071,a 25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development m Service ❑ Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil RI Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Frankenburg,Amy Contact Name: Shriver,Tyson Authorized Title: Non-Operated Resource Lead Contact Email: Tyson.Shriver@bp.com Authorized Signature: a).\./..,../vDate: 5 '1' I'L Contact Phone: +1 9075644133 Form 10-404 Revised 04/2017 (/`7'7 t&/6 p R B DMS 1,,'t,- Submit Original Only .d� f0(Q7, i, 7� G13 t0t1 7 • • Daily Report of Well Operations H-28A ACTIVITYDATE SUMMARY ***WELL FLOWING ON ARRIVAL***(perforating). DRIFT TO 3.70" DEPLOYMENT SLV @ 10,701' MD W/3.70"CENT, 2-1/2" SAMPLE BAILER (No issues, No sample). DRIFT TO DEVIATION @ 11,942'SLM W/ 1.75 CENT, 1-1/2"SAMPLE BAILER (No issues, No sample). 4/12/2017 ***WELL S/I ON DEPARTURE***(pad op notified=job complete, well &well head status). CTU#8- 1.50"CT:Adperf MIRU CTU. MU 1.75"centralizer and GR/CCL BHA. RIH to 13,060'. Log up to 12560'. Paint flag. Log up to 10,500', POOH. Good data on log; +9' Correction. Make up& RIH w/ 32'x 1.56" HES Perfecta guns. 7/11/2017 ***Job in Progress*** CTU#8- 1.50"CT:Adperf MIRU CTU. MU 1.75"centralizer and GR/CCL BHA. RIH to 13,060'. Log up to 12560'. Paint flag. Log up to 10,500', POOH. Good data on log; +9' Correction. Make up& RIH w/ 32'x 1.56" HES Perfecta guns. 7/11/2017 ***Job in Progress*** ***Continue from WSR 07/11/17*** CTU#8- 1.50"CT:Adperf Continue RIH w/32'x 1.56" HES Perfecta guns for perf interval#1. Tie into flag, perforate interval#1: 12530- 12570 (Reference RPM log from 9/19/2014). POOH and LD spent guns. MU run#2. RIH w/32'x 1.56" Perfecta guns. Tie into flag, perforate interval#2: 12506- 12530. POOH and LD spent guns. RDMO. 7/12/2017 ***Job Complete*** WELLHEAD= �A�EI/OY • H -28A S N 0 ES:WELL 1292 A21NGLE>70°c 12000'•MAX ACTUATOR= AXELSON OKB.ELEV= 75.6' I I + P D=4 562" BF.ELEV= 46.2' •CONDUCTOR, H -110 / [ 211T 1 - ]�5 1/2"OTIS SSSV LAND N KOP= 1500' # Max Angie= 94 @ 12801' 2498' -5-1/2"X 4-112"XO D=3.958", Datum ND= 11768' D - �� GAS LFT MANDRELS ` W Datum TVD= 8800'SS ST ND TVD DEV TYRE VLV LATCH PORT DATE m � - 7 3493 3199 45 MERLA DONE RM ' 16 09/24/14 5-1/2"TBG,17#,L-80,.0232 bpf,D=4.892" 1-1 2498' 6 4624 4002 44 NERLA DMY RM F. 0 02/26/95 13-3/8"CSG,68#,L-80 BUTT,0=12.415" j- 281W I 5 6978 5589 52 AULA SO RM r 20 09/24/14 4 8697 6708 46 MERLA DMY RA ' 0 05/21/88 Minimum ID = 1.78' @ 10729' 3 9787 7519 43 PU LA 'DIY RM ' 0 10/28/13 WIPER PLUG BUSHING 2 10564 8043 51 ASSILA ""DMY RA ' 0 05/21/88 IN 2.7" D E P LOY SLEEVE 1 10753 8162 51 MERLA ""DMY RM ' 0 10/08/92 'STA#3=DMY HAS EX TE DED PACKING ESTLIATED TOC(06/30/14) 10527' '.' P`'- "STA'S#2(BENT LATCH)&#1 = CEMENTED(06130114) 1.101 •�% 10701' 3.70"DEPLOY SLY,D=3.00" TOP OF 3-1/2 X 2-7/8"X 2-3/8"LNF2 10701' iii S I A II r ,%.-It. 10706' 3-1/2"X 2-7/8"XO,D=2.370' h.%IV i' I 10708' H2-718-H S X NP,D=2.313" illI10 •It 10718' I2-7/8"LM XO,0=2.250" ►�P \ - k� N 1 ; •fir► 1�1�� w 10719' 12.70'DEPLOY SLV,D=2.250' ok."1 j N 464 WIPER PLUG BUSHING @ 10729',ID=1.78" VNA 4 \i♦ ►ItI.". '",It 10748' -14-112"MERLA PATCH,0=3.25"(11/22/93) eAri 10766' -14-1/2"MERLA PATCH,D=3.25"(01118/93) 144A- * ►%1i" w�♦III i±t�tIfi/41 .%. 10831' -I4-1/T BKR L SLDSLV,D=3.812" BEI-IND b CT LIR ‘.2‘.. ; k_,..X 10890' -TM/TBG SEAL ASSY ►Z� ' S►� ►j1j�j �!lb 10906' -19-5/8"x 4-1/2"T PIV HBBP PKR,D=3.958" TOP OF 7"LM H kIN II iV ' r• • 10958 ►tI1 ` i 10947' -14-1/2"OT S X NP,D=3.813" , s. I,I, 1097W -14-1/2"OTIS XN NP,D=3.725" 8E}1ND ,I% 1 k'V CT LIR 4-1/2"TBG,12.6#,L-80 BUTT, 11012' LI * , 11012' H4-1/2-WLEG,D=3.958" .0152 bpf,ID=3.958" I. �4. 9-5/8"CSG,47#,L 80 NSCC/BUTT,D=8.681' H 11221' �;� 1 e`Z41 * 3-1/T MONOBORE WS w/CMT SLIPS(08/29/14) -1 11410' ►II !►Ii'� , NiLOUT WINDOW(H-28A) 11410 -11415' wl RA TAG IN WS TRAY @ 11415' X4'1 linr # ►rI1 4 ,I♦� 7"LNR 29#,L-80 BUTT,.0371 bpf,0=6.184" -11410H *I'I'I. ~'+� 12203' -12-3/8"RA MARKER I, 4 TOC DUMP 25 GAL GMT(10/30/13) --{11670'SLM ►I/.14:0'I`�i��` -4:--.�. eVI1i•II �a+ii s .'N PERFORATION SUMAARY *�b1`:�:�.:10 '''`4't; ' 13097' -1-314"CUP REF LOG:BKR RPM ON 09/15/14 :I4I.I A ♦�aI�v.1 Veit w/DUAL BPV ANGLE AT TOP FERF:88°@12506" �'�..-Ii,�'+�i• �' Note:Refer to FfoduStk n DB for historiSal perf data ICN `tia, SIZE SPF NTB VAL Opn/Sqz SHOT SQZ ��•-< �� �i 1-3/4"CEP w DUAL BPV 13107' `._i�4`!,y- 1.56" 6 12506-12570 0 07/12/17 `��`` �; 1.56" 6 12600-12690 0 09/15/14 PBTD H 13112' 1.56" 6 12740-13085 0 09/15/14 2-3/8"LNR,4.7#,L-80 T1-1511, 13150' 1.56" 6 13100-13110 S 09/11/14 09/14/14 (IvI�I�jleT, .0039 bpf,0=1.995" DATE REV BY COP&&NTS DATE REV BY CON'ITS PRUDHOE BAY UNIT 05/22/88 N18E ORIGINAL COMPLETION 10/01/14 TI-1/PJC FINAL ODE APPROVAL WELL H-28A 09/15/14 NORDIC i CTD SIDETRACK(H-28A) 02/11/15 CRR/PJC ADD PERF REF LOG INFORMATION FERMI'No: 2140040 09/18/14 PJC DRLG HO CORRECTIONS 07/13/17 M/JMO ADFERFS(07/12/17) AR No: 50-029-21806-01 09125/14 PJC DRLG DRAFT CORRECTIONS SEC 21,T11N,R13E,1243'RC&1265'FEL 09/26/14 ?/PC GLV CIO(09/24/14) 09/30/14 114 PJC DEPTH CORRECTED-2-3/8'LNR HP Exploration(Alaska) TDlIoo Hunt, Jennifer L (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, February 17, 2015 8:50 AM To: Hunt,Jenner L (DOA) Subject: PBU H- A/ PTD #214-004 2-5147. /� ( c Categories: Attention / .y 7" Hi Jennifer, Please reference the following well: Well Name: PBU H-26A Permit#: 214-004 tz c� API #: 50-029-21806-01-001, Date of Test: 2/9/2015 Type of Test: IPT (Initial Production Test) Choke Size: 93 Choke Unit: Deg Production Method: Gas Lift ` Duration (Hours Tested). 5 Top Reference (Top Perf MD): 12600' Bottom Reference (Bottom Perf MD): 13085' Tubing Flowing (Pressure). 195 Casing Pressure. 980 Total Test(Rate f/0, W, G). 363/35/496 24-Hour Rate (0, W, G): 1740/ 168 /2383 Gravity (Oil, API): 26 Deg GOR (Gas-Oil Ratio): 1369 This well began Production on: 2/9/2015 Method of Operations on this date: Gas Lift RBDM `1 FEB 2 3 2015 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable direct inspection of the file. b . J (-- 00 4. Well History File Identifier Organizing(done) ❑ Two-sided ❑ Rescan Needed RES AN: OVERSIZED: NOTES: Color Items: ❑ Ms: fri.ayscale Items: Logs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: L 1 BY: al° Date: I J Is! ', Project Proofing orBY: ACM Date: ! ' 5 /s/ Scanning Preparation a. x 30 = 10 d + =TOTAL PAGES k. 13' (Count does not include cover sheet)04 f BY: left Date: Ili cip,54 /s/ Production Scanning Stage 1 Page Count from Scanned File: 1t2 T (Count does include cov sheet) Page Count Matches Number in Scanning Preparation: YES }/14 NNOBY: dill, Date:! / £1—) i 5— /s/Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc 0 • .-, J 0 J • 9 . O cl O W 01 W_ OI W_ o OW al W a1 - , ~ I- z, CO Z -1---J OI LL Q LL Q •• x UI U Q N .c73 W JI Z JI Z N -0 y 2 —1 J G, n — 2 d cA N U a)u) 2 to Q al Q W V V t' ml m co �' 5 )I CO Z U) Z (n o o o o c N >, So co d LII co a l U aai a0 ani ani 0 cco 2 •o in > 0 22 O > a > a CC X a a�') w I— o 0 a) m ai O 2 F 2 F >, >, >. >, n a) 2 7 Za c m UI vI vl vl vI Z 2 Z Z �I m • 2 L7 c O > > > > I a f0 Iii N W N N N N (n (n co CO NI �I "� m LE a a a.. a `O co ^a W W W W cco ccoo ccoo ccoo coo ccoo O_ W U ,� N JI Un Un Un Un N N N N N N — O m H COQ 20 20 E 20 20 2 2 2 2 2 2 0 0 0 V 0 o c Z co ai coI E ui yI O •ai rnl ai• coI ai ai ai ai ai ai ai 2 Z 0 m O Li- 1 co it it it I- t IIIIIU W = i L~ i � a �UOOm I O IuU U I� U U U U U U U W Co Co E •ccal cal caw Caa c c c c c c c v yc 0) o o f I 200 o� owno02 O o 0 0 0 0 0 00 Q U J 1 1 I21 a20° 2 mNv Eo m coEa � I aXaFa 1 aaaaaW W N N W N 03 W N O W N 03 W N O W W W LU LU W LU N 2 Q U C O Cl. Y 0 0 0 0 0000000 W� 2 co •� N N N N N N N N N N N N ILL O J +f0 co -C.-1 r r r Cel- e- a. a W W2-J 2 U m o 00 Q 0 Lo O Lo 7 I o.al0 N M 0CL cn o C o f ZI c m o G r O N o- En tn o ' i it LO r U ' E U o J fY 2 QCO ` on N rs co 0. = J H 0 d' z O 0 J 2 �2 Na m W U CD To O) J ( 0 a) a A I co 0 U Qo I Lua ii ' Ilia Q n OIce z D Z d U 1 o O c E J m c0 -O 2 (n Z 7 CO CO co co CO CO CO CD CO CO CO CO 45 a) I Ico co co co co co co CO CO CO CO CO V CD c E,O 0 0 O 0 0 O O O O O ] 0 ai rn �' co =° CO co CO CO CO CO CO CO CO CO CO I co co •2 •2 2 •rn •o) •rn •2 •o) •rn •rn •o) rn 0 o z o 0 0 0 0 0 0 0 0 0 0 0 0 -J . et > 0 Jb- y N v v v v v v v v v v v v v 0F w W 0 O O O O O O O O O O O O m = U (0 E N N N N N N N N N N N N N NO W Z O 2 to z N N N N N N N N N N N N N F- 16 w 0 To Q O 0 �, Z W C t] 2 U 0 0 0 0 U U U U U U U U J d al G I- S 3 LU W W W W W W W W W W W JO Oa W 0 W JI In w JI W JI 9 o Le; CD o W • JI 0 JI Z FI -I Z JI Z IN) x NZ LLI z a z CO1 m Z COI Z (01 o o a) CU a O) 0 < U < LL (n d u_ (n it u) a a j :; py Z Cl)' (N I p D I 0 p) N 0 2 N 0 > > > a' m U o in 0I F vl v1 2�U .11 �1 �I �I 2: pT) c c H o > z • ai I Z Z it Iil UI Z �ci I vI N N I E-LLI N N N N N } CL CL a C— Cl.. a a a m m 2 0 o w w p) yLL w w w w CO CO a s m N N CCI o ix)aCO CO ii IN UU) a a I I W W W O o a _Q Y o 0 0) o 0 pap pap pap pap C U) U) 0 N1 yI_ y Z F NI m1 c yI yI N N N N 20 20 2 2 m 2 aY 0 (nI0 2 m E 2 mY 2 m 2 m 2 2 2 2 2 a 0 • ai co ai NIS DD •ai a1? ai S10 ai CO(ICIII hi�I m ai S10 ai�I ai�I� ai w ai ai ai ai «° Z 'LL N LL a) cc ILLY IL1-I it Dim it W ita' -I LLct it •a it 0 lL lL ll itLn1 0_IY 0_10 a 0010 0U I2 0 2JIv1 2C�I0 c)UI2 2UI-a 2012co c)0 m I) 2 I)NI ' cQ 1- 'Ca' I o C . c a-m P. 'CT--<- c -U 'C -m 'c a c m CN CN C C Ca- l'"" N O('U O(�- �� Om=1 Om01 O OmN Om =1 Om01 Om= OmD1 OD 00 O O Om • U N<I-1 -1<IMII aci?W NpapmI Npap W N Npap W NpapmI Npap W N W m1 5)<W N0 N0 N N Npap -Ed) WNm W ND N2 LN0 WNLL W W NV) LTi C.4:' WNLL WND W NLL W N WN W W WN OO j V V 7 •- V . V �T Ci. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N LU W J V COO. (71 ZO < O el _ co y 0 M d co J a w° CL 0 m in o o ON_ E a / 1 O M V 0 "" 0 J Q N Q` 04 N A r 0. 2 2 • 0 CO CO .- CB Cr) O m VI O 715 0 Q Ce c I • m a c n Q d Z E U co E co co Z U) co co y m co m co m m m m m as m 15 m m co co -o co co m m co co as co co m m co co 0 D 0 ami 0 0 0 0 0 0 0 0 0 0 0 0 0 ca Too o I m m m m m m m m m m m m m ) cn 0 a 5 v)o) o) a) o) o o) 'o) ' c3) o) D D D _1 0 D D 0 D D D D D D D D D . > V V in Un Lc) U) to U) U) c!) U) U) U) In In Ln 0 I- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O N N N N N N N N N N N N NN N N er In U) n U)in LO In IIn Un Lr) In to in cf) cf) Un C74 N N N N N NN NN N N N N N N N N E o 13 in w v • U 0 0 0 0 U U 0 0 0 0 0 0 U U U 0 O d 0 ID 0 p 0 0 0 0 0 0 0 0 0 0 0 0 0 a. 1 w W J W W W W W W W ll) W W W W W Ce0m I ' o co o Z >- >- >- 0co• a) I O D L CoCo . O In 2 C 1 ^C co O +++iii JJJ ' Z UI r t 0 ,.. a 2 U a Q 031 l 2 d .O I f 0 0 0 ✓ . _0 z —Lo ii I �I N Q c 'cE - I m co m om E >- >- �Q 0 p O Ce 4 W N V O N O 0 W zO v a.. .0 :° w Q. vIN � N ; 0 0 W °' vs z N aS N f0 Ce 0 a LE E W W v p, (0 m a) to 0) a V m O — E0 Z 1 m I v; 2 c Q I D o rnH N J E C I I 41 7 I Om o 5 2 0 0 "' r 0rw O C a V ` 10 4 - M U 0 o J Q G } © E M C E N Q N O p C. 2Has U a ZN a) o E) Co c C N >7. r_ • a) E CO m 0 H E W - 7 O a) A C U w CO X G co 1 I W N CD ()_____) • C Q m L a I 0 is c o mQ Z0 T-3U > e0 z 1 as v v m '0 C N N O) t0 I, }\ C} � N 1 c a o o\�J 13 Lu o \J m Ov L0~ N W V E O 0 0 c I N N W to m c N d N a' D E N 0 p Q 8- N -3 W ld Q' Z p m Q O < O 0 :+ C C U r U 0 a. p p 0 a a) Coa) a E co v 0 O 0. 'DO 0 0_ N 0 E .Q • p 1 - u E p o E d E 1 E d a 2 WW 3 I ? U a (7 1 0 U C C1 1 V F 'CEIVED DEC 19 2014 Letter of Transmittal AOGCC BAKER Date: DATA LOGGED December 19, 2014 r /Z/2o15 HUGHES M.K.BENDER To: From: State of Alaska AOGCC Baker Hughes 1NTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage,Alaska 99515 Paula Lacey paula.lacey@bakerhughes.com Please find enclosed the final log data for the following well(s): 2o3 H-28APB 1(H='28A q L0 Enclosed for each well(s): 2 (ea.) hardcopy prints of final log data reports 1 compact disk containing electronic log data files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: , State of Alaska AOGCC DATE: //�J F 'CEIVED DEC 19 2014 Letter of Transmittal VPU AOGCC BAKER Date: DATA LOGGED December 19, 2014 /2/2015 HUGHES M.K.BENDER To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey paula.lacey@bakerhughes.com Please find enclosed the final log data for the following well(s): 2�2flS H-28APB 1 CH- 8A ' Enclosed for each well(s): 2 (ea.) hardcopy prints of final log data reports 1 compact disk containing electronic log data files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: , State of Alaska AOGCC DATE: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION - ' WELL COMPLETION OR RECOMPLETION REPORT AND LOG , '- "C 1 a. Well Status: . ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1 b Well Class 20AAC 25 105 20AAC 25 110 0 Exploratory 0 Stratigraphic 0 GINJ El WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One • ®Development 0 Service 2. Operator Name: 5.Date Comp.,Susp.,or Abend. 12. Permit to Drill Number. BP Exploration(Alaska) Inc. 9/17/2014. 214-004 ' 3. Address: 6. Date Spudded: 13. API Number: _P.O. Box 196612,Anchorage,Alaska 99519-6612 8/30/2014 ' 50-029-21806-01-00 • 4a. Location of Well(Governmental Section): 7.Date T.D. Reached: 14. Well Name and Number. Surface: 9/9/2014 • • PBU H-28A • 1243' FNL, 1265'FEL, Sec.21,T11N, R13E, UM 8. KB(ft above MSL): 75.38. 15. Field/Pool(s) Top of Productive Horizon: 3444'FSL, 3977' FWL, Sec. 15,T11N, R13E, UM GL(ft above MSL): 44.88' • Prudhoe Bay/Prudhoe Bay • Total Depth. 9.Plug Back Depth(MD+TVD) 3774'FSL,4615'FWL, Sec. 15,T11N, R13E, UM • 13107' 9020' , - 4b. Location of Well(State Base Plane Coordinates,NAD; 10 Total Depth(MD+TVD) 16. Property Designation. Surface: x- 643323 • y- 5959546 . Zone- ASP4 /13150' 9019' ' ADL 028284 • TPI. x- 648464 y- 5964333 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 649094 y- 5964676 Zone- ASP4 None 18. Directional Survey: ®Yes 0 No 19.Water depth,if offshore. 20. Thickness of Permafrost(TVD). (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1991' 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD. MWD/GR/RES, RPM/GR/CCL 11410' • 8586' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP I BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor 29' 109' 29' 109' 8 cu yds Concrete 13-3/8" 68# L-80 31' 2818' 31' 2688' 17-1/2" 4013 cu ft Arctic Set II &I 9-5/8" 47# L-80 29' 11221' 29' 8464' 12-1/4" 2709 cu ft Class'G' 7" 29# L-80 10958' 11410' 8292' 8586' 8-1/2" _368 cu ft Class'G' 2-3/8" 4.7# L-80 10701' 13150' 8130' 9019' 3-1/4" 58 sx Class'G' 24. Open to production or injection? 0 Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD (MD+TVD of Top&Bottom;Perforation Size and Number): ) 1.56"Gun Diameter,6 spf 5-1/2", 17#, L-80 x 11012' 10906'/8259' 4-1/2", 12.6#, L-80 COMPLETNIII Q '� 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 12600'-12690' 9025'-9025' 'LLL WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No 12740'-13085' 9026' 9021' I DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protect w/60 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE. GAS-OIL RATIO' Test Period Flow Tubing Casing Press. Calculated OIL-BBL: GAS-MCF. WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes 0 No . Sidewall Core(s)Acquired? 0 Yes 0 No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None , RBDMS OCT 15 2014 Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit Original Only 29. GEOLOGIC MARKERS(List all formations and 'ters encounter 30. FORMATION TESTS NAMEFTVD Well Tested? _ es 0 No - Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. CGL-Zone 3 11598' 8733' None • Base of CGL-Zone 2C 11675' 8799' Zone 1B 12299' 9024' . Formation at Total Depth: Zone 1B 12299' 9024' 31.List of Attachment. Summary of Daily Drilling Reports,Well Schematic Diagram, Surveys,Cement Report 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Trevor Hyatt,564-4627 Email: Trevor.Hyatt@bp.com Printed Name: Joe Lastu • Title: Drilling Technologist - Signature: Phone 564-4091 Date: 16/1 //1/— INSTRUCTIONS General. This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a. Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b. TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28 Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28. Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only • TREE = � $"CI" H 28A W�iLHFAD= MCEVOY � SAF TOTES:WELL ANGLE>70°@ 12000''"'MAX ACTUATOR= AXE LSON DOG. 30.5° 12921'"' OKE.B-EV= 75.6' I BFBEV= 46 2H -110 ' I--I 211 T -{5-1/2"OTIS SSSV LAND NP,D=4.562" . KOP= 1500' ^# 2498' H5-1/2-X 4-1/2"XO,D=3.958' Max Angle= 94°@ 12801' D_ - Datum MD= 11768' - GAS LFT MANDRELS Datum TVD= 8800'SS ST MD TVD DEV TYPE VLV LATCH FORT DATE _I 5-1/2"TBG,17#,L-80,.0232 bpf,D=-4.892" -1 2498' 7 3493 3199 45 MBNA DOME RM or 16 09/24/14 6 4624 4002 44 MERLA DMY RM r 0 02/26/95 13-3/8"CSG,68#,L-80 BUTT,D=12.415' - 2818' � 5 6978 5589 52 MERLA SO RM r 20 09/24/14 4 8697 6708 46 Pv .A DMY RA VI"' 0 05/21/88 Minimum ID = 1.78'@ 10729' 3 6787 7516 434651 3 FuB2tA 'OMY RM ' 0 10/28/13 WIPER PLUG BUSHING 2 10564 8043 51 PE A "DMY RA ' 0 05/21/88 1 10753 8162 51 WERLA "MY RM _' 0 10/08/92 IN 2.7" DEPLOY SLEEVE 'STA#3=DMY HAS EXII:NDEI)PACKING "STA'S#2(BENT LATCH)&#1= CEMENTED(06/30/14) ESTIMATED TOC(06/30/14) 10527WY'pl.,,„,,.. ' f i I 10701' 3.70"DEPLOY SLV,ID=3.00" TOP OF 3-1/2 X 2-7/8"X 2-3/8"LNR H 10701' v.` 10706' 3-1/2"X 2-7/8"XO,D=2.370" (.S., Q' 10708' --12-7/8"HES X NP,D=2.313" 11 10718' -I2-7/8-LNR XO,D=2.250" � a ti N IIII 10719' 2.70"DEPLOY SLV,D=2.250" t44 J WIP PLUG BUSHING @ 10729`,ID=1.78" ooi:5 Ic a ,R 10748' H4-1/2"MERLA PATCH,ID=3.25"(11/22/93) ivo '(I 10766' H4-1/2"IVERiA PATCH,D=3.25"(01/18/93) " 10831' H4-1/2 BKR L SLD SLV,ID=3.812" BEHIND RiI % a ; (1 ' 10890' -1 TBG SEAL ASSY CT LNR lea N*MI ► -11 4Pii 10906' -19-5/8"x 4-1/2'TM/HBBP PKR D=3.958" TOP OF 7"LNRH 10958' IP.%1 i 10947' -�4 tt2"OTIS X NP,D=3.813' I NI 10979' -I4-112"O71S XN NP,D=3.725" ND A 'te __ CT INN 4-1/2'TBG,12.64,L-80 BUTT, 11012' a �' 11012' -41/2"WLEG,D=3.958'l .0152 bpf,ID=3.958' ' ele‘ Vie 9-5/8"CSG,47#,L 80 NSCC/BUTT,D=8.681' H 11221' ' a 3-1/2"MONOBORE WS w/CMT SLPS(08/29/14) H 11410' MLLOUT WINDOW(H-28A) 11410'-11415' w!RA TAG IN WS TRAY @ 11415' 7"LHR,29#,L-80 BUTT,.0371 bpf,D=6.184" -11410a.. 12203' -12-3/8"RA MARKER TOC DUMP 25 GAL CMT(10/30/13) -11670' SLM ... �- N. �iteite ' + mss 13097' 1-3/4"CEP PERFORATION SU NMARY `"`� FIEF LOG:GR/ROP!RESISTNITY ON 09/XX/14 . 'fit w/DUAL BPV ANGLE AT TOP PERE:91° 12600' 1 ",�♦_ . Note:Refer to ProduStion DB for historiSal pert data ",���•nj�`�r.. it SIZE SPF NTERVAL Opn/Sgz SHOT SOZ �V4I��` �'i i i 1.56" 6 12600-12690 0 09/15/14 = — 1-3/4'CEPw DUAL BPV 13107' ! `�111 ^ � -01j 1.56" 6 12740-13085 0 09/15/14 PBTD H 13112' 1.56" 6 13100-13110 S 09/11/14 09/14/14 2-318-LNR,4.7#,L-80 T1-611, -1 13150' r.�.�.•••••• . .0039 bpf,0=1.995' DATE REV BY COMMENTS DATE FEV BY COM ENTS PRIDHOE BAY UNIT 05122/88 N18E ORIGINAL COMPLETION 10/01/14 TEV PJC FINAL ODE APPROVAL WELL: H-28A 09/15/14 NORDIC s CTD SIDETRACK(H-28A) PUNT No:"2140040 09/18/14 PJC DRLG HO CORRECTIONS AR No: 50-029-21806-01 09/25/14 PJC DREG DRAFT CORRECTIONS SEC 21,T11N,R13E,1243'FM_&1265'FEL 09/26/14 ?/PC GLV C/O(09/24/14) 09/30/14 Tl-Y PJC DEPTH COFit`2ECTH)-2-3/8"LNR BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)©75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 8/25/2014 06:00 - 08:00 2.00 MOB P PRE RELEASE RIG NORDIC 2 FROM 2014 SUMMER MAINTENANCE AFE AT 06:00 8/25/14. HOLD PRE-SPUD WITH DAY AND NIGHT CREWS. LOCK OUT Q-07 FOR RIG MOVE AND SURATION OF OPERATIONS ON H-28A. PREP RIG TO MOVE OFF OF SUMMER MAINTENANCE RIG MATS _ SET T MATS ON H-28. 08:00 - 10:30 2.50 MOB P PRE MOVE RIG FROM NORTH SIDE OF H PAD TO H-28. VERIFY ANNULUS PRESSURES ARE 0 PSI AND CLOSE VALVES BEFORE PULLING OVER WELL. WSL AND NORDIC SUPT PRESENT FOR RIG MOVE. ACCEPT RIG AT 10:30 8/25/14 10:30 - 15:00 4.50 RIGU P PRE ND TREE CAP NU BOPE 15:00 - 18:00 3.00 RIGU P PRE INSTALL CTD RISER INSTALL GRAPPLE,PULL TEST IPULL COIL ACROSS 18:00 - 19:00 1.00 BOPSUR P PRE MOVE INJECTOR/STAND ON LEGS FILL STACK WITH WATER 19:00 - 19:30 0.50 BOPSUR P PRE SHELL TEST BOPE 250/4500 PSI 19:30 - 00:00 4.50 BOPSUR P PRE STATE INSPECTOR JEFF JONES WITNESS 8/25/14 19:30 PRESSURE TEST ALL BOP EQUIPMENT AS I PER AOGCC REGS,SUNDRY#195-149,AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST CHOKE VALVES,CHOKE AND KILL HCR I VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER -LOWER 2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -VBR TESTED WITH BOTH 2-3/8"AND 3-1/2" TEST JOINT -UPPPER 2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -ANNULAR TESTED WITH BOTH 2-3/8"AND 3-1/2"TEST JOINT -TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS -TEST GAS ALARMS -PERFORM DRAW DOWN TEST OF (ACCUMULATOR -ALL TESTS WITNESS OR REVIEWED BY TOOLPUSHER AND WSL Printed 9/29/2014 2:11:23PM North America-ALASKA-BP Pagel 2 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,563.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 8/26/2014 00:00 03:003.00 BOPSUR ' P PRE STATE INSPECTOR JEFF JONES WITNESS 8/25/14 19:30 PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,SUNDRY#195-149,AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR IPREVENTER -LOWER 2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -VBR TESTED WITH BOTH 2-3/8"AND 3-1/2" TEST JOINT -UPPPER 2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -ANNULAR TESTED WITH BOTH 2-3/8"AND 1 j 3-1/2"TEST JOINT -TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS ,-TEST GAS ALARMS -PERFORM DRAW DOWN TEST OF ACCUMULATOR ALL TESTS WITNESS OR REVIEWED BY TOOLPUSHER AND WSL I 03:00 - 07:00 4.00BOPSUR P PRE PICK UP INJECTOR AND FILL COIL TEST INNER REEL VALVE AND PACK OFF 07:00 - 09:00 2.00 BOPSUR P PRE PULL BOPE TEST PLUG I INSTALL RISER CAP AND PRESSURE TEST 09:00 - 09:30 0.50 BOPSUR P PRE RIG EVAC/H2S/MAN DOWN DRILL.2 MEN ' DOWN(INTENTIONAL)ALL OTHER INDIVIDUALS MUSTERED.AAR AFTER DRILL. 09:30 - 10:30 i 1.00 BOPSUR P WEXIT OPEN UP WELLAND FLOW CHECK FOR 15 MIN. 10:30 - 14:00 3.50 DRILL P WEXIT INSTALL COILED TUBING CONNECTOR PULL TEST,CALIBRATE WEIGHT CELL. 14:00 - 15:00 1.00 DRILL N WAIT WEXIT WAIT ON WSL CHANGE OUT 15:00 - 15:30 0.50 DRILL P WEXIT HELD PJSM FOR MU PILOT BHA 15:30 - 16:30 1.00 DRILL P WEXIT CIRCULATE REEL VOLUME FORWARD FOR SLACK MANAGEMENT 16:30 - 17:30 1.00 DRILL P WEXIT MU PILOT BHA -GET ONTO WELL WITH INJECTOR -ATTEMPT TO PRESSURE TEST QTS 17:30 - 20:30 3.00 DRILL N SFAL WEXIT TROUBLESHOOT AND REPAIR SLB WELL HEAD PRESSURE SENSOR. 20:30 - 00:00 3.50 DRILL P WEXIT TEST QTS 250/3500 PSI RIH W/PILOT MILL BHA F/61'TO 3500'AT 100 FPM,PUMPING 0.35 BPM W/115 PSI. CIRCULATE FREEZE PROTECT OUT OF WELL AT 3500'PUMPING 2.40 BPM W/3835 PSI. 'CONTINUE TO RIH F/3500'TO 10800'MD. LOG TIE-IN W/-1'CORRECTION. BEGIN DISPLACING WELLAND PITS FROM KCL TO 9.5 PPG POWER PRO. Printed 9/29/2014 2:11:23PM North America-ALASKA-BP Page 3 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)t 75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 8/27/2014 00:00 - 01:30 1.50 DRILL P WEXIT CONTINUE TO RIH W/PILOT MILL BHA F/ 10800'TO 10980'WHILE DISPLACING THE WELL FROM KCL TO 9.5 PPG POWER-PRO. TAG CEMENT AT 10980'. -CIRC RATE:2.3 BPM -CIRC PRESSURE:3800 PSI 01:30 - 04:00 2.50 DRILL P WEXIT MILL PILOT HOLE F/10980'TO 11012'MD. -BPM IN/OUT:1.53/1.50 BPM -DHWOB:1.67 KLBS -CIRC PRESSURE:3237 PSI -FREE SPIN:3050 PSI -MW IN/OUT:9.51/9.48 PPG -ECD:10.27 PPG -IA/OA/PVT:146 PSI/131 PSI/370 BBL INSTANTANEOUS ROP 1D-25 FPH AVERAGE ROP:12.8 FPH 04:00 - 05:30 1.50 DRILL P WEXIT BACKREAM F/TUBING TAIL AT 11012'TO TOC AT 10980'AT-3.0 FPM CHANGING ORIENTATION 4 X TO CLEAN OUT ANY CEMENT STRINGERS IN THE TUBING. -BPM:1.52 -CIRC PRESSURE:3050 PSI 05:30 - 00:00 18.50 DRILL P WEXIT MILL PILOT HOLE F/11012'TO 11324'MD. -BPM IN/OUT:1.52/1.51 BPM DHWOB:0.67-1.75 KLBS -CIRC PRESSURE:3076-3150 PSI -FREE SPIN:3050 PSI -MW IN/OUT:9.51/9.48 PPG -ECD:10.27 PPG -IA/OA/PVT:321 PSI/693 PSI/368 BBL 8/28/2014 00:00 07:15 7.25 DRILL P WEXIT MILL PILOT HOLE Fl 11324'TO 11445'MD. -BPM IN/OUT:1.49/1.48 BPM -DHWOB:1.5 KLBS -CIRC PRESSURE:3076-3150 PSI -FREE SPIN:2875 PSI -MW IN/OUT:9.48/9.44 PPG -ECD:10.23 PPG -IA/OA/PVT:380 PSI/223 PSI/381 BBL 07:15 - 08:45 1.50 DRILL P WEXIT POOH F/11,445'-11,000'MD -PUMP 10 BBLS HIGH VIS SWEEP -REAM CONTACT POINT PER PLAN 08:45 - 11:00 2.25 DRILL P WEXIT POOH F/11,000'-75'MD. -BPM IN/OUT: -MW IN/OUT:9.44 PPG/9.48 PPG -FLOW CHECK AT SURFACE(NO FLOW) 11:00 - 12:00 1.00 DRILL P WEXIT HELD PJSM FOR LD MILLING BHA -GET INJECTOR OFF OF WELL -LD PILOT MILL BHA -GUAGE MILLS:2.80 GO/2.79 NO GO -RECONFIGURE MWD TOOLS 12:00 - 13:00 1.00 DRILL P WEXIT MU CALIPER/DRIFT BHA -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 13:00 - 16:45 3.75 DRILL P WEXIT RIH WITH CALIPER/DRIFT BHA -BPM IN/OUT:0.80/1.07 -MW IN/OUT:9.42 PPG/9.42 PPG -LOG TIE IN+1'DEPTH CORRECTION 16:45 - 17:15 0.50 DRILL P WEXIT LOG CEMENT PILOT HOLE F/11,440'-10,500' MD. Printed 9/29/2014 2:11:23PM North America-ALASKA-BP Page 4 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date 9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor.NORDIC CALISTA I UWI:500292180600 Active datum:Orig rKB(H-28A)©75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:15 - 19:30 2.25 DRILL P WEXIT POOH F/10,500'-72'MD. -BPM IN/OUT:0.85/0.58 -MW IN/OUT:9.42 PPG/9.44 PPG 19:30 - 21:30 2.00 DRILL P WEXIT LD CALIPER/DRIFT BHA -WAIT ON LOGGING DATA 21:30 - 23:00 1.50 DRILL P WEXIT STAND BACK INJECTOR -CHECK CROWN-O-MATIC -CHANGE OUT BALES -BRING WHIPSTOCK AND TOOLS INTO PIPE SHED. 23:00 - 00:00 1.00 STWHIP P WEXIT PJSM.MU WHIPSTOCK BHA 8/29/2014 00:00 - 00:15 0.25 STWHIP P WEXIT FINISH M/U WHIPSTOCK BHA. STAB COIL. GET ON WELL. TEST QTS 250/3500 PSI. 00:15 - 04:45 4.50 STWHIP P WEXIT RIH W/WHIPSTOCK BHA F/69'TO 11,418'MD AT 65 FPM PUMPING 0.25 BPM W/850 PSI. -LOG TIE-IN W/+2'CORRECTION. -PU WEIGHT:35K-LBS -SO WEIGHT:19K-LBS 04:45 - 05:15 0.50 STWHIP P WEXIT SET WHIPSTOCK WITH TOWS AT 11,410'AT 210`. SHEARED OUT AT 3500 PSI. SET 3.5K-LBS DHWOB TO CONFIRM SET. P/U TO 11,390'AND FLOWCHECK WELL- STATIC. 05:15 - 07:30 2.25 STWHIP P WEXIT POH W/WHIPSTOCK SETTING BHA F/11,390' TO 68',PUMPING 1.07 BPM W/1680 PSI. 07:30 - 08:30 1.00 STWHIP P WEXIT LD WHIPSTOCK RUNNING TOOLS -FLOW CHECK AT SURFACE(NO FLOW) -HELD PJSM FOR LD RUNNING TOOLS -STAND BACK INJECTOR -LD RUNNING TOOLS -RESET AKO TO 0.6 ON DIRECTIONAL MOTOR 08 30 - 09:00 0.50 STWHIP P WEXIT MU MILLING DIRECTIONAL MOTOR -GUAGE MILLS(MILL-2.74 GO/STRING MILL -2.73 GO) -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 09:00 - 12:00 3.00 STWHIP P WEXIT RIH WITH MILLING BHA -BPM IN/OUT:0.31/0.68 -MW IN/OUT:9.38 PPG/9.42 PPG -LOG TIE-IN(+2')DEPTH CORRECTION 12:00 - 19:45 7.75 STWHIP P WEXIT MILL WINDOW F/11,409.89'-11,415'MD TIME • MILL AT 1 FPH F/11,409.89'TO 11,415'. ALLOWED WEIGHT TO MILL OFF AT 11,414.9' DUE TO BORE PRESSURE INCREASE. -BPM IN/OUT:1.51/1.49 -MW IN/OUT:9.45 PPG/9.39 PPG DHWOB:0.50-1.75 KLBS -CIRC PRESSURE:2860-2935 PSI -ECD:10.13 PPG -IA/OA/PVT:255 PSI/10 PSI/359 BBL Printed 9/29/2014 2:11:23PM North America-ALASKA-BP Page 5 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/me: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)©75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:45 - 22:00 2.25 STWHIP P WEXIT CONTINUE TO MILL AT 1 FPH F/11,415'TO 11,416.9'AS PER PROGRAM. -BPM IN/OUT:1.51/1.49 -MW IN/OUT:9.45 PPG/9.39 PPG -DHWOB:0.50-1.75 KLBS -CIRC PRESSURE:2860-2935 PSI -ECD:10.13 PPG -IA/OA/PVT:255 PSI/10 PSI/359 BBL 22:00 - 00:00 2.00 STWHIP P WEXIT MILL RATHOLE F/11,416.9'TO 11,420' BPM IN/OUT:1.51/1.49 -MW IN/OUT:9.45 PPG/9.39 PPG -DHWOB:0.50-1.75 KLBS -CIRC PRESSURE:2860-2935 PSI -ECD:10.13 PPG IA/OA/PVT:255 PSI/10 PSI/359 BBL 8/30/2014 00:00 - 02:15 2.25 STWHIP P WEXIT DRILL RATHOLE F/11,420'TO 11,425'MD. -BPM IN/OUT:1.51/1.49 -MW IN/OUT:9.45 PPG/9.39 PPG -DHWOB:0.50-1.75 KLBS -CIRC PRESSURE:2860-2935 PSI -ECD:10.13 PPG IA/OA/PVT:328 PSI/232 PSI/359 BBL 02:15 - 03:45 1.50 STWHIP P WEXIT REAM WINDOW THREE TIMES AND DRY DRIFT. NO DRAG OBSERVED DURING REAMING OR DRY DRIFT PASSES. 03:45 - 04:00 0.25 STWHIP P WEXIT FLOWCHECK WELL. WELL STATIC. 04:00 - 07:00 3.00 STWHIP P WEXIT POH W/WINDOW MILL BHA F/11400'TO 70' MD AT 50-100 FPM,PUMPING 2.10 BPM W/ 3385 PSI. 07:00 - 07:30 0.50 STWHIP P WEXIT LD MILLING ASSEMBLY -FLOW CHECK AT SURFACE(NO FLOW) -HELD PJSM FOR LD MILLING BHA -GET OFF OF WELL WITH INJECTOR -LD MILLING BHA -GUAGE MILLS(2.74-GO 2.73 NO GO) 07:30 - 08:00 1 0.50 STWHIP P WEXIT CLEAN RIG FLOOR -PREPARE RIG FLOOR FOR SLIP/CUT DRILL LINE 08:00 - 10:00 2.00 STWHIP P WEXIT HELD PJSM FOR SLIP/CUT DRILLING LINE -HANG BLOCKS/PREPARE TOOLS FOR JOB -SLIP&CUT 50'OF DRILLING LINE -CLEAN UP RIG FLOOR/UNLATCH BLOCKS _ 10:00 - 11:00 1.00 DRILL P PROD1 MU 3-1/4"BUILD ASSEMBLY -HELD PJSM FOR MU BUILD BHA -MU BUILD BHA -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 11:00 - 14:00 3.00 DRILL P PROD1 RIH WITH BUILD ASSEMBLY -BPM IN/OUT:0.60/0.83 -MW IN/OUT:9.4 PPG/9.33 PPG -LOG TIE-IN(+1')DEPTH CORRECTION 14:00 - 00:00 10.00 DRILL P PROD1 DRILL 3-1/4"BUILD SECTION F/11,425'TO 11,616'MD. -BPM IN/OUT:1.55/1.52 -MW IN/OUT:9.66 PPG/9.55 PPG -DHWOB:0.50-1.75 KLBS -CIRC PRESSURE:3025-3135 PSI -ECD:10.44 PPG -IA/OA/PVT:563 PSI/444 PSI/350 BBL Printed 9/29/2014 2:11 23PM North America-ALASKA-BP Page 6 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Dame: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 8/31/2014 00:00 - 04:00 4.00 DRILL P PROD1 DRILL 3-1/4"BUILD SECTION F/11,616'TO 11,622'MD. -BPM IN/OUT:1.55/1.52 -MW IN/OUT:9.66 PPG/9.55 PPG -DHWOB:0.50-1.75 KLBS -CIRC PRESSURE:3025-3135 PSI -ECO:10.44 PPG -IA/OA/PVT:563 PSI/444 PSI/350 BBL 04:00 - 07:00 3.00 DRILL P PROD1 PJSM POH W/DRILLING BHA FOR BIT FROM 11,622'TO 72'AT 100 FPM PUMPING 1.77 BPM W/2920 PSI. -FLOW CHECK ON SURFACE(NO FLOW) -GET OFF WELL WITH INJECTOR -STAND BACK DIRECTIONAL TOOLS 07:00 - 07:30 0.50 BOPSUR P PROD1 FUNCTION TEST BOP -PERFORM WEEKLY FUNCTION TEST OF BOP -FUNCTION ALL RAMS FROM DRILLERS CONSOLE -FUNCTION WITH 2"&2-3/8"TEST JOINTS 07:30 - 08:00 0.50 DRILL P PROD1 MU 3-1/4"LATERAL BHA -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 08:00 - 13:00 5.00 DRILL P PROD1 RIH WITH 3-1/4"LATERAL BHA F/72'-11,622' MD. -BPM IN/OUT:0.41/0.77 CIRC PSI:1145 -MW IN/OUT:9.53 PPG/9.56 PPG -LOG TIE-IN(-1')DEPTH CORRECTION 13:00 - 00:00 11.00 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/11,622'TO 11,657'MD. -BPM IN/OUT:1.53/1.512 -MW IN/OUT:9.60 PPG/9.53 PPG -DHWOB:0.50-1.75 KLBS -CIRC PRESSURE:3354-3705 PSI -ECD:10.44 PPG -IA/OA/PVT:649 PSI/596 PSI/365 BBL 9/1/2014 00:00 - 02:15 2.25 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/11,657'TO 11,660'MD. -BPM IN/OUT:1.53/1.49 -MW IN/OUT:9.59 PPG/9.53 PPG -DHWOB:1.50-2.25 KLBS -CIRC PRESSURE:3580 PSI -ECD:10.40 PPG -IA/OA/PVT:653 PSI/594 PSI/349 BBL PUMPED 20 BBL LOW VIS SWEEP. 02:15 - 05:15 3.00 DRILL P PROD1 POH FOR BIT F/11,660'MD TO 72'MD AT 100 FPM PUMPING 1.77 BPM W/3000 PSI. 05:15 - 07:30 2.25 DRILL P PROD1 PJSM FOR CHANGING BIT. -TAG UP. -POP OFF INJECTOR. -UNSTAB COIL -SHORT CHAIN BHA AND PULL OUT OF HOLE. -BREAK OFF BIT -M/U REFURBISHED HYCALOG 2.74"X 3.25" BI-CENTER BIT -RUN BHA DOWN -STAB COIL -GET ON WELL -TEST QTS. Printed 9/29/2014 2.11.23PM North America-ALASKA-BP Page 7 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 ,X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Ong rKB(H-28A)©75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 09:30 2.00 DRILL P PROD1 RIH WITH 3-1/4"LATERAL BHA F/72'-11,680' MD. -BPM IN/OUT:0.41/0.77 CIRC PSI:1145 -MW IN/OUT:9.61 PPG/9.54 PPG -LOG TIE-IN(-2')DEPTH CORRECTION 09:30 - 00:00 14.50 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/11,660'TO 12,041'MD. -BPM IN/OUT:1.68/1.68 -MW IN/OUT:9.61 PPG/9.55 PPG -DHWOB:1.50-2.25 KLBS -CIRC PRESSURE:3552 PSI -ECD:10.46 PPG -IA/OA/PVT:253 PSI/133 PSI/368 BBL PUMPED 10 BBL LOW VIS SWEEP 9/2/2014 00:00 - 04:00 4.00 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/12,041 TO 12,200'MD. -BPM IN/OUT:1.73/1.72 -MW IN/OUT:9.64 PPG/9.56 PPG -DHWOB:1.50-3.25 KLBS -CIRC PRESSURE:3800 PSI -ECD:10.46 PPG -IA/OA/PVT:295 PSI/170 PSI/382 BBL PUMP 2OBBL LOVIS SWEEP 04:00 - 06:00 2.00 DRILL P PROD1 WIPER TRIP F/12,200'TO WINDOW AT 25 FPM PUMPING 1.81 BPM W/3650 PSI. -LOG RA-TAG W/+4'CORRECTION. -WIPER F/11,470'TO 12,200'AT 30 FPM PUMPING 1.46 BPM W/2830 PSI. 06:00 - 09:00 3.00 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/12,200'- 12,327'MD. -BPM IN/OUT:1.71/1.69 -MW IN/OUT:9.64 PPG/9.58 PPG -DHWOB:1.50-3.25 KLBS -CIRC PRESSURE:3550-3800 PSI -ECD:10.46 PPG _ -IA/OA/PVT:369 PSI/195 PSI/377 BBL 09:00 - 09:30 0.50 DRILL P PROD1 HELD WEEKLY H2S/RIG EVAC DRILL -SIMULATED MAN DOWN -SIMULATED H2S -NOTIFIED PAD OPERATOR PRIOR TO DRILL -HELD AAR WITH CREW 09:30 - 14:00 4.50 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/12,327'- 12,600'MD. -BPM IN/OUT:1.71/1.69 -MW IN/OUT:9.64 PPG/9.58 PPG -DHWOB:1.50-3.25 KLBS -CIRC PRESSURE:3550-3800 PSI -ECD:10.46 PPG -IA/OA/PVT:369 PSI/195 PSI/377 BBL Printed 9/29/2014 211:23PM North America-ALASKA-BP Page 8 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Ong rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 14:00 - 18:30 4.50 DRILL P PROD1 POOH F/12,600'-72'MD -POOH INSPECT/CHANGE BIT&MOTOR UNABLE TO ACHIEVE REQUIRED BUILD/TURN RATES. -POOH TO 11,200'MD(FLOW CHECK-NO FLOW) '-POOH TO 10,600'MD.LOG CCL TO 11,200' MD. -POOH TO SURFACE -BPM IN/OUT:1.99/1.60 CIRC PSI:3385 -MW IN/OUT:9.64 PPG/9.60 PPG -FLOW CHECK ON SURFACE(NO FLOW) -STAND BACK INJECTOR -LD DIRECTIONAL TOOLS 18:30 - 20:30 2.00 DRILL P PROD1 MU 3-1/4"LATERAL BHA -ADJUST MOTOR AKO F/1.4 TO 1.6 -PU DIRECTIONAL TOOLS -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 20:30 - 00:00 3.50 DRILL P PROD1 RIM WITH BHA#8. -TEST AGITATOR AT 150'MD. TIE IN WITH-2'CORRECTION. RIH TO 12,500'MD. 9/3/2014 00:00 - 00:30 0.50 DRILL P PROD1 CONTINUE RIH WITH BHA#8. RIH F/12,500'T/12,600'MD. 00:30 - 04:00 3.50 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/12,600'- 12,723'MD. -BPM IN/OUT:1.54/1.52 -MW IN/OUT:9.65 PPG/9.62 PPG -DHWOB:1.50-3.25 KLBS -CIRC PRESSURE:3550-3800 PSI -ECD:10.51 PPG -IA/OA/PVT:275 PSI/67 PSI/364 BBL 04:00 - 05:00 1.00 DRILL P PROD1 WIPER F/12,723'T/12,500'MD WHILE CIRCULATE UP SAMPLE WIPER BACK TO BOTTOM 05:00 - 19:30 14.50 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/12,723'- 13,027'MD. -BPM IN/OUT:1.55/1.54 -MW IN/OUT:9.65 PPG/9.62 PPG -DHWOB:1.50-2.5 KLBS -CIRC PRESSURE:3550-3800 PSI -ECD:10.51 PPG -IA/OA/PVT:332 PSI/96 PSI/361 BBL 19:30 - 23:00 3.50 DRILL N DFAL 13,027.00 PROD1 POOH FOR SUSPECTED FAILED AGITATOR -POOR WEIGHT TRANSFER,TROUBLE SLIDING,SLOW ROP -35'/MIN OPEN HOLE WITH 1.5 BPM -90'/MIN CASED HOLE WITH 1.75 BPM -FLOW CHECK AT SURFACE,NO FLOW 23:00 - 00:00 1.00 DRILL N DFAL 13,027.00 i PROD1 PJSM AND LD DRILLING BHA#8 -STAND BACK 2-3/8"COILTRAK -LD AGITATOR,MOTOR AND BIT -CHANGE MOTOR BEND FROM 1.6 TO 1.4 AKO 9/4/2014 00:00 - 00:30 0.50 DRILL N DFAL 13,027.00 PROD1 PJSM AND PU DRILLING BHA#9 -MU NEW AGITATOR TO MOTOR AND BIT -MU 2-3/8"COILTRAK -STAP COIL,GET ON WELL,PRESS TEST QTS -RIH TO 150'AND SURFACE TEST AGITATOR Printed 9/29/2014 2:11:23PM • North America-ALASKA-BP Page 9 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 04:30 4.00 DRILL N DFAL 13,027.00 PROD1 RIH WITH DRILLING ASSEMBLY -100'/MIN CASED HOLE WITH 1.0 BPM -40'/MIN OPEN HOLE WITH 0.5 BPM 04:30 - 11:00 6.50 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/13,027'- 13,181'MD. -BPM IN/OUT:1.69/1.68 -MW IN/OUT:9.61 PPG/9.55 PPG DHWOB:1.50-2.50 KLBS -CIRC PRESSURE:3800-4175 PSI -ECD:10.63 PPG -IA/OA/PVT:460 PSI/203 PSI/326 BBL • 11:00 - 12:00 1.00 DRILL P PROD1 PERFORM GEO WIPER WHILE WAITING ON ORDERS -POOH F/13,181-12,000'MD -RIH TO BOTTOM AFTER CONFIRM NEW ORDERS NEW PLAN IS TO DRILL UP IN SECTION FOR DATA POINTS 12:00 - 13:45 1.75 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/13,181'- 13,270'MD. -BPM IN/OUT:1.69/1.68 -MW IN/OUT:9.61 PPG/9.55 PPG DHWOB:1.50-2.50 KLBS -CIRC PRESSURE:3800-4175 PSI -ECD:10.63 PPG -1A/OA/PVT:460 PSI/203 PSI/326 BBL 13:45 - 15:45 2.00 DRILL P PROD1 LOSS 100%RETURNS AT 13,260'MD. -DRILLED 10'TO 13,270'MD ✓ -POOH TO WINDOW PER WELL PLAN -NOTIFIED WTL,WOS,ODE OF LOSS RATE -MM IN/OUT:1.7/0 CIRC PSI:3735 MW IN/OUT:9.55/0 -PVT:324 BBLS POOH TO WINDOW PER WELL PLAN BPM IN:COIL:1.5 BPM ANN:0.5 BPM -BPM OUT:0.48 STATIC LOSS RATE AT 10,945'MD -BPM IN/OUT:0.75/0.25 (30 BPH LOSS) -MW IN/OUT:9.53 PPG/9.56 PPG -ECD:10.63 CIRC PSI:1415 15:45 - 21:15 5.50 DRILL P PROD1 CONTINUE POOH TO TOP OF CEMENT PILOT HOLE CIRCUATE ABOVE TOC WHILE WAIT ON MUD TRUCKS BRING ON NEW MUD INTO PITS 21:15 - 23:30 2.25 DRILL P PROD1 RIH WITH DRILLING ASSEMBLY -30'/MIN WITH 0.50 IN/0.12 OUT BPM -TIE IN WITH+8.5'CORRECTION 23:30 - 00:00 0.50 DRILL N SFAL 13,270.00 PROD1 WHILE ATTEMPTING TO DRILL AHEAD LOST TRACTION MOTOR ON MUD PUMP 2. TROUBLESHOOT TRACTION MOTOR. -POOH TO TOP OF CEMENT PILOT HOLE POOH 25'/MIN WITH 0.70 IN/0.30 OUT BPM Printed 9/29/2014 2:11:23PM North America-ALASKA-BP Page 10 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C (3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA I UWI:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 9/5/2014 00:00 - 06:30 - 6.50 DRILL N SFAL 13,270.00 PROD1 CONTINUE TROUBLESHOOT TRACTION MOTOR -POOH TO TOP OF CEMENT PILOT HOLE -CIRCULATE ABOVE TOC WITH 0.70/0.46 BPM IN/OUT -FIND SHORTED OUT CABLE,REPLACE SAME TEST MUD PUMP 2 TRACTION MOTOR, FUNCTION PROPERLY 06:30 - 08:30 2.00 DRILL N SFAL 13,270.00 PROD1 RIH WITH DRILLING ASSEMBLY -30'/MIN WITH 1.07 IN/1.01 OUT BPM -TIE IN WITH+3.5'CORRECTION -RECORD SLOW PUMP RATE 08:30 - 14:15 5.75 DRILL P PROD1 DRILL 3-1/4"LATERAL SECTION F/13,270'- / 13,350'MD -BPM IN/OUT:1.65/1.50 -MW IN/OUT:9.61 PPG/9.50 PPG DHWOB:1.50-2.50 KLBS -CIRC PRESSURE:3800-4039 PSI -ECD:10.54 PPG -IA/OA/PVT:4 PSI/-12 PSI/296 BBL 14:15 - 18 00 3.75 DRILL C PROD1 POOH F/13,350'-72'MD -BPM IN/OUT:1.51/1.24 CIRC PSI:3380 MW IN/OUT:9.58 PPG/9.50 PPG -FLOW CHECK ON SURFACE(NO FLOW) -STAND INJECTOR BACK -LD DIRECTIONAL TOOLS 18:00 - 18:30 0.50 DRILL C PROD1 CREW CHANGE -INSPECT TOOLS AND EQUIPMENT -PREPARE FOR BILLET RUN 18:30 - 20:00 1.50 DRILL C PROD1 PJSM AND MU BILLET BHA -WSL VERIFY BILLET OD AND SHEAR PINS -PU ANCHORED BILLET AND SETTING TOOLS -MAKE UP TO 2-3/8"COILTRACK -GET ON WELL,PRESS TEST QTS -STATIC LOSS RATE 3-4 BPH 20:00 - 00:00 4.00 DRILL C PROD1 RIH WITH BILLET ASSEMBLY -80'/MIN WITH 0.46/0.70 BPM IN/OUT SLOW TO 30'/MIN THROUGH 2.80"CEMENT PILOT HOLE -TIE IN WITH-4'CORRECTION -DYNAMIC LOSS RATE 5-6 BPH 9/6/2014 00:00 - 00:30 0.50 DRILL C PROD1 CONTINUE RIH AND SET BILLET -RIH TO 11,961.8'MD WITH TOP OF BILLET AT 11,950'MD -CLOSE EDC AND SHEAR PINS AT 3400 PSI -SET DOWN 4K#TO VERIFY BILLET SET -PU AND VERIFY RELEASE FROM BILLET 00:30 - 03:00 2.50 DRILL C PROD1 POOH WITH BILLET ASSEMBLY -FLOW CHECK ABOVE CEMENT PILOT HOLE, NO FLOW -100'/MIN WITH 0.94/0.45 BPM IN/OUT -FLOW CHECK AT SURFACE,NO FLOW 03:00 - 03:30 0.50 DRILL C PROD1 PJSM AND LD BILLET ASSEMBLY -LAY DOWN 2-3/8"COILTRAK -LAY DOWN BILLET SETTING TOOLS -ALL PINS SHEARED AS DESIGNED Printed 9/29/2014 2:11:23PM • North America-ALASKA-BP ;Page11 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 08:30 5.00 DRILL C 1 PROD1 PJSM AND PERFORM SLACK MANAGEMENT -CUT OFF CTC,BOOT E-LINE -PUMP BACK SLACK,CUT 25'COIL TUBING -INSTALL CTC,PULL TEST SAME TO 40K# PRESS TEST CTC TO 250/3500 PSI -GET ON WELL,PUMP SLACK FORWARD 08:30 - 09:30 1.00 DRILL C PROD1 MU BUILD/LATERAL BHA -FILL HOLE WITH 6 BBLS FLUID HELD PJSM FOR PU DIRECTIONAL TOOLS I-MU DIRECTIONAL BHA -GET ONTO WELL WITH INJECTOR PRESSURE TEST QTS 250/3500(PASSED) 09:30 13:00 3.50 DRILL C PROD1 RIH WITH DRILLING ASSEMBLY -BPM IN/OUT:1.58/1.86 -MW IN/OUT:9.55 PPG/9.50 PPG TIE IN WITH-5'DEPTH CORRECTION -RECORD SLOW PUMP RATE 13:00 - 18:00 5.00 DRILL C PROD1 DRILL 3-1/4"LATERAL SECTION F/11,950'- 12,060'MD BPM IN/OUT:1.55/1.45 MW IN/OUT:9.57 PPG/9.50 PPG -DHWOB:0.3-1.50 KLBS -CIRC PRESSURE:3150-3550 PSI -ECD:10.34 PPG -IA/OA/PVT:4 PSI/-12 PSI/302 BBL DRILL AHEAD OFF BILLET PER BP RECOMMENDED PRACTICE -1'FPH FOR 1'OF DRILLING -2'FPH FOR 1'OF DRILLING -DRILL AHEAD MAINTAINING WOB -NO STALLS DURING KICK-OFF FROM BILLET 18:00 - 21:00 3.00 DRILL C PROD1 DRILL 3-1/4"LATERAL SECTION F/12,060'- 12,138'MD -BPM IN/OUT:1.50/1.41 -MW IN/OUT:9.59 PPG/9.53 PPG -DHWOB:0.5-2.5 KLBS -CIRC PRESSURE 3100-3200 PSI -ECD:10.39 PPG -IA/OA/PVT:31 PSI/10 PSI/292 BBL 21:00 - 21:30 0.50 DRILL C PROD1 H2S RIG EVAC DRILL WITH AAR -SIMULATE MAN DOWN WITH CTS SUPERVISOR -DISCUSS ROLES FOR SECURING WELL BEFORE EVAC -DISCUSS RIG SWEEP PROCEDURES 21:30 - 00:00 2.50 DRILL C PROD1 DRILL 3-1/4"LATERAL SECTION F/12,060'- 12,226'MD -BPM IN/OUT:1.53/1.43 -MW IN/OUT:9.58 PPG/9.55 PPG -DHWOB:B 0.3-1.3 KLBS -CIRC PRESSURE:3350 PSI -ECD:10.40 PPG -IA/OA/PVT:79 PSI/0 PSI/288 BBL Printed 9/29/2014 2:11:23PM North America-ALASKA-BP Page 12 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)©75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) r (usft) 9/7/2014 00:00 - 04:00 4.00 DRILL C PROD1 DRILL 3-1/4"LATERAL SECTION F/12,226'- '12,400'MD -BPM IN/OUT:1.53/1.43 -MW IN/OUT:9.58 PPG/9.55 PPG -DHWOB:B 0.3-1.3 KLBS -CIRC PRESSURE:3100-3400 PSI -ECD:10.40 PPG -IA/OA/PVT:79 PSI/0 PSI/288 BBL 04:00 - 06:00 2.00 DRILL C PROD1 LONG WIPER FROM 12,400 TO WINDOW -25'/MIN WITH 1.49/1.30 BPM IN/OUT POOH -TIE-IN WITH+6'CORRECTION 25'/MIN WITH 1.49/1.49 BPM IN/OUT RIH REDUCE PUMP RATE PAST THE BILLET 06:00 - 13:30 7.50 DRILL C PROD1 DRILL 3-1/4"LATERAL SECTION F/12,400'- 12,771'MD -BPM IN/OUT:1.58/1.56 -MW IN/OUT:9.61 PPG/9.61 PPG -DHWOB:0.5-2.25 KLBS -CIRC PRESSURE:3340-3940 PSI -ECD:10.57 PPG IA/OA/PVT:271 PSI/77 PSI/326 BBL 13:30 - 15:30 2.00 DRILL C PROD1 LONG WIPER FROM 12,771 TO WINDOW -25'/MIN WITH 1.49/1.30 BPM IN/OUT POOH -TIE-IN WITH+3'CORRECTION -25'/MIN WITH 1.49/1.49 BPM IN/OUT RIH I-REDUCE PUMP RATE PAST THE BILLET 15:30 - 22:00 6.50 I DRILL C ' PROD1 DRILL 3-1/4"LATERAL SECTION F/12,771'- 13,040'MD -BPM IN/OUT:1.55/1.48 -MW IN/OUT:9.67 PPG/9.63 PPG DHWOB:0.5-1.50 KLBS CIRC PRESSURE:3200-3300 PSI ECD:10.63 PPG -IA/OA/PVT:350 PSI/145 PSI/78 BBL -LAST 15'DRILLING DIFFICULT.POOR WEIGHT TRANSFER.DIFFICULT SLIDING. HIGH LATERAL VIBRATIONS. 22:00 - 23:30 1.50 DRILL C PROD1 POOH WITH DRILLING ASSEMBLY -25'/MIN WITH 1.49/1.30 BPM IN/OUT FLOW CHECK ABOVE PILOT HOLE,NO FLOW 23:30 - 00:00 0.50 DRILL C PROD1 ATTEMPT TO OPEN EDC.EDC OPEN 10%AND STOP.CANNOT OPEN OR CLOSE EDC. POOH WITH DRILLING ASSEMBLY -90'/MIN WITH 1.00/0.60 BPM IN/OUT FILLING DOWN BACKSIDE 9/8/2014 00:00 - 01:30 1.50 DRILL C PROD1 CONTINUE POOH WITH DRILLING ASSEMBLY -90'/MIN WITH 1.00/0.60 BPM IN/OUT FILLING DOWN BACKSIDE 01:30 - 02:30 1.00 DRILL C PROD1 PJSM AND LD DRILLING BHA -POP OFF,BLOW DOWN BHA -LAY DOWN 2-3/8"COILTRAK.EDC CLOSED. -LAY DOWN MOTOR AND BIT.BIT GRADE: 1-2-CT. -PLAY IN MOTOR BEARING FOUND TO BE OUT OF SPEC. -PLAY IN MOTOR BEARING 0.126".MAX ALLOWABLE 0.069". Printed 9/29/2014 2:11:23PM • North America-ALASKA-BP Page 13 of 14 Operation Summary Report Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 06:00 3.50 BOPSUR C PROD1 I INSPECT BOP RAMS AND EQUIPMENT PJSM AND LEAK TIGHT TEST TREE VALVES -SUCK DOWN STACK AND OPEN BOP DOORS -INSPECT BOP RAMS.ALL RAMS GOOD. 06:00 - 07:00 1.00 BOPSUR C PROD1 PJSM AND SHELL TEST -WSL COMPLETE PRESSURE CROSSCHECK CHECKLIST WITH NORDIC DRILLER PRIOR TO TEST -SHELL TEST TO 250/3500 PSI FOR 5/5 CHARTED MIN,GOOD TEST 07:00 - 17:30 10.50 j BOPSUR C PROD1 I STATE GIVEN NOTIFICATION OF BOP TEST '09/07/2014 10:30 STATE INSPECTOR ROBERT NOBLE WAIVE WITNESS 09/07/2014 11:00 PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,SUNDRY#188-044,AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST CHOKE VALVES,CHOKE AND KILL HCR 'VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER ALL RAMS TESTED WITH ACCUMLATOR HYDRAULIC PRESSURE AND WITH LOCKDOWN SCREWS -LOWER 2"PIPE RAMS TESTED WITH 2" TEST JOINT -2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -UPPPER 2"PIPE RAMS TESTED WITH 2" TEST JOINT -ANNULAR TESTED WITH BOTH 2"AND 2-3/8" TEST JOINTS TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS -TEST GAS ALARMS -PERFORM DRAW DOWN TEST OF ACCUMULATOR -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL -NO FAILURES 17:30 - 18:00 0.50 DRILL C PROD1 PJSM AND PICK UP DRILLING BHA PU NEW MOTOR,RE-RUN BIT,AND AGITATOR -MU 2-3/8"COILTRAK -STANDBACK BHA 18:00 - 18:30 0.50 DRILL C PROD1 ALLOW FOR CREW CHANGEOUT PRE-TOUR WALKAROUNDS 18:30 - 19:00 0.50 DRILL C PROD1 PJSM AND STAB INJECTOR -RUN BHA IN HOLE,STAB COIL -GET ON WELL,PRESS TEST QTS 19:00 - 23:00 4.00 DRILL C PROD1 RIH WITH DRILLING BHA -100'/MIN WITH 0.46/0.77 BPM IN/OUT IN TUBING -TIE-IN ABOVE WINDOW WITH-4' CORRECTION -25'/MIN WITH 1.08/1.11 BPM IN/OUT TO BOTTOM Printed 9/29/2014 2:11:23PM North America-ALASKA-BP Page 14 of 14 Operation Summary Report - -- - _-- _....__.___...-- Common Well Name:H-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2014 End Date:9/9/2014 X3-014VC-C:(3,025,583.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL C PROD1 DRILL 3-1/4"LATERAL SECTION F/13,040'- 13,072'MD -BPM IN/OUT:1.48/1.42 -MW IN/OUT:9.65 PPG/9.60 PPG -DHWOB:0.5-1.50 KLBS -CIRC PRESSURE:3500-3530 PSI -ECD:10.61 PPG IA/OA/PVT:29 PSI/0 PSI/295 BBL 9/9/2014 00:00 - 02:00 2.00 DRILL C PROD1 DRILL 3-1/4"LATERAL SECTION F/13,072'- ,13,151'MD -BPM IN/OUT:1.48/1.42 MW IN/OUT:9.64 PPG/9.60 PPG DHWOB:0.5-2.00 KLBS CIRC PRESSURE:3400-3500 PSI ECD:10.61 PPG -IA/OA/PVT:65 PSI/0 PSI/324 BBL 02:00 - 04:30 2.50 DRILL P PROD1 WIPER TO WINDOW -POOH 25'/MIN WITH 1.48/1.32 BPM IN/OUT -TIE-IN AT WINDOW WITH+2'CORRECTION RIH 30'/MIN WITH 1.53/1.60 BPM IN/OUT -STACK WT 12,450'MD,REDUCE PUMPS TO WORK THROUGH -TAG AND VERIFY TDAT13,150'MD 04:30 - 06:00 1.50 DRILL P PROD1 I POOH LAYING IN LINER RUNNING PILL 1.5 PPB ALPINE BEADS -40'/MIN WITH 0.30/0.14 BPM IN/OUT -FLOW CHECK ABOVE CEMENT PILOT HOLE 06:00 - 07:30 1.50 DRILL P PROD1 OPEN EDC ABOVE CEMENT PILOT HOLE POOH CIRCULATING AT MAX RATE -90'/MIN WITH 2.00/1.65 BPM IN/OUT 07:30 - 08:30 1.00 DRILL P PROD1 LD DIRECTIONAL TOOLS -HELD PJSM FOR LD DIRECTIONAL TOOLS -STAND INJECTOR BACK -LD DIRECTIONAL TOOLS -PREPARE RIG FLOOR FOR RUNNING LINER Printed 9/29/2014 2:11:23PM North America-ALASKA-BP Page 1 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/9/2014 08:30 - 12:30 4.00 CASING P RUNPRD PERFORM SLACK MANAGEMENT -CUT OFF COIL CONNECTOR -PUMP OUT 258'SLACK -INSTALL E-LINE BOOT -INSTALL COIL CONNECTOR -PULL/PRESSURE TEST CONNECTOR CIRCULATE 3/4"DISCO BALL 12:30 - 17:30 5.00 CASING P RUNPRD PJSM.PICK UP AND RIH 2 3/8"TH 511 L-80 LINER. -MAKE UP JEWELRY AS PER PROGRAM. -TOTAL OF 75 JTS 2 3/8"TH 511 LINER RIH. -DRIFTED 1ST 15 JTS MADE UP W/1.89" DRIFT. 1-DRIFT EVERY 5TH ONE THERE AFTER. -MAKE UP TORQUE ON LINER 700 FT/LBS. -MAKE UP DEPLOYMENT SLEEVE,3.70"X 3.00"W/4"GS PROFILE. -MAKE UP(4)JTS 2-1/16"CSH -MAKE UP QUICK CONNECT AND GET ON WELL -PRESS TEST QTS 17:30 - 19:30 2.00 CASING P RUNPRD RIH WITH LINER 100'/MIN WITH 0.33/0.64 BPM IN/OUT SEE TOP OF CEMENT FLAG AT 10,886'MD (-5'CORRECTION) 19:30 21:00 ' 1.50 CASING P RUNPRD RUN INTO CEMENT PILOT HOLE AND OPEN HOLE -45'/MIN WITH 0.32/0.44 BPM IN/OUT -RIH TO 12,833'MD AND CANNOT WORK PAST 21:00 - 00:00 3.00 CASING P RUNPRD -MAKE SEVERAL ATTMPES TO WORK PAST 12,833'MD WITH DIFFERENT RUNNING SPEED AND PUMP RATES.CANNOT WORK PAST. -MAKE NOTIFICATION TO SUPERINTENDENT AND ODE.GET APPROVAL TO PUMP 20 BBLS 1 OF MINERAL OIL. -CONTINUE TO WORK COIL WHILE PUMP MINERAL OIL TO SHOE. 9/10/2014 00:00 - 02:00 2.00 CASING P RUNPRD '-CONTINUE PUMP MINERAL OIL TO SHOE. -SPOT 10 BBLS MINERAL OIL OUTSIDE SHOE AND ALLOW TO SOAK. -WORK LINER FROM 12,833'MD TO 13,000' MD.LINER COME FREE. -RIH WITH LINER. -SEE TD FLAG AT 13,041(-10'CORRECTION) -TAG TD AT 13,157'MD(UNCORRECTED) SET DOWN 10K TO 13,163'MD -PU WT ON BOTTOM=43K# 02:00 - 02:30 0.50 CASING P RUNPRD PJSM AND LAUNCH 5/8"BALL,RELEASE FROM LINER -LAUNCH BALL.BALL LAND AT 70 BBLS PUMPED. -PRESSURE UP TO 4100 PSI AND SEE PIN SHEAR. -PU TO BREAKOVER 35K#AT 13,154.8'MD. -PU ADDITIONAL 4'TO 13,150.7'MD. -RIH AND SET DOWN 10K#TO 13,163'MD. Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 2 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) • Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)fp75.38usft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 03:30 1.00 CASING N DFAL 13,151.00 RUNPRD -COME ONLINE WITH RIG PUMPS WITH 1.5 BPM 1%KCL. -SEE IMMEDIATE PRESSURE UP TO 3200 PSI. -COME DOWN OFF PUMPS.COME UP WITH PUMPS SLOWLY TO 1.5 BPM. -PUMP 9 BBLS AND BUMP LINER WIPER PLUG.PRESSURE UP TO 3500 PSI. -CALL AND MAKE NOTIFICATIONS TO ODE AND SUPERINTENDENT.AGREE TO POOH WITH LINER RUNNING TOOLS. 03:30 - 04:00 0.50 CASING N DFAL 13,151.00 RUNPRD -PICKUP OUT OF LINER AND BREAK CIRCULATION. -CIRCULATE REMAINING MINERAL OIL OUT OF HOLE. BLOW MUD BACK INTO PITS. 04:00 - 06:00 2.00 CASING N DFAL 13,151.00 RUNPRD POOH WITH LINER RUNNING TOOLS 100'/MIN WITH 1.61/1.19 BPM IN/OUT -FLOW CHECKAT SURFACE,NO FLOW 06:00 - 07:00 1.00 CASING N DFAL 13,151.00 RUNPRD PJSM AND LD LINER RUNNING TOOLS -POP OFF,STAND BACK INJECTOR -LD 4 JTS 2-1/16"CSH -STAND BACK LINER RUNNING TOOLS 07:00 - 09:30 2.50 CASING N DFAL 13,151.00 RUNPRD !WAIT ON PLAN FORWARD DECIDE TO PERFORM CEMENT SQEEZE SIMOPS:PERFORM DERRICK INSPECTION WITH AUDITORS 09:30 - 13:00 3.50 CASING N DFAL 13,151-.00 RUNPRD PJSM AND RIG UP TO RUN 1"CSH -STAND INJECTOR ON LEGS -ASSEMBLY SPINNERS ON LITTLE JERKS -BRING PERF GUNS UP TO THE RIG FLOOR 13:00 - 13:30 0.50 BOPSUR N DFAL 13,151.00 RUNPRD PJSM AND LEAK TIGHT TEST TREE VALVES -SHUT IN MASTER,SWAB,SSV -LEAK TIGHT TEST,VERIFY BARRIERS 13:30 - 16:00 2.50 BOPSUR N DFAL 13,151.00 RUNPRD PJSM AND C/O RAMS -OPEN BOP DOORS,REMOVE 2-3/8"COMBI RAMS -INSTALL 1.315"COMBI RAMS -INSTALL TEST PLUG,FILL STACK 16:00 - 20:00 4.00 BOPSUR N DFAL 13,151.00 RUNPRD PJSM AND TEST BOPE FOR 1.315"CSH -ALL TESTS TO 250/3500 PSI FOR 5/5 CHARTED MIN -SHELL TEST BOP -TEST ANNULAR PREVENTER ON 1"CSH TEST JOINT -TEST 1.315"RAMS ON 1"CSH TEST JOINT WITH ACCUMULATOR PRESSURE AND WITH LOCKDOWNS -PULL TEST PLUG,OPEN WELL TO TESTED NIGHT CAP -FILL HOLE 20:00 - 00:00 ' 4.00 PERF N DFAL 13,151.00 RUNPRD PJSM AND PICK UP PERFORATING ASSEMBLY PU PERF GUN AND E-FIRE HEAD -RIH WITH PERF GUN ON 1"CSH -BREAK CIRCULATION AND PUMP 1.5X BU _ EVERY 25 JTS Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 3 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum.Orig rKB(H-28A)©75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/11/2014 00:00 01:30 1.50 PERF N DFAL 13,151.00 RUNPRD CONTINUE PICK UP PERFORATING ASSEMBLY -CONTINUE RIH WITH PERF GUN ON 1"CSH -BREAK CIRCULATION AND PUMP 1.5X BU EVERY 25 JTS -PU RUNNING TOOLS AND 4 JTS 2-1/16"CSH -MU QUICK CONNECT AND GET ON WELL -PRESS TEST QTS 01:30 - 04:00 2.50 PERF N DFAL 13,151.00 RUNPRD RIH WITH PERFORATING ASSEMBLY -90'/MIN WITH 0.51/0.81 BPM IN/OUT -LIGHT TAG PBTD AT 13,118'MD (UNCORRECTED) 04.00 - 04:30 0.50 PERF N DFAL 13,151.00 RUNPRD PJSM AND FIRE PERF GUN -PU AND TAKE UP WT=37K# -RIH AND LIGHT TAG TO CONFRIM PBTD 13,118'MD(UNCORRECTED) -PUTOUPWTAT13,115'MDPLUS 3'TO 13,112'MD -PERFORM FIRING SEQUENCE,POSITIVE INDICATION OF FIRE 04:30 - 06:00 1.50 PERF N DFAL 13,151.00 RUNPRD POOH WITH PERFORATING ASSEMBLY -35'/MIN WITH 0.87/0.70 BPM IN/OUT -HOLD 250 PSI WHP INSIDE LINER FLOW CHECK ABOVE LINER,NO FLOW 06:00 - 07:30 1.50 PERF N DFAL 13,151.00 RUNPRD CONTINUE POOH FROM TOP OF LINER 90'/MIN WITH 0.84/0.48 BPM IN/OUT -FLOW CHECK AT SURFACE,NO FLOW 07:30 - 10:30 3.00 PERF N DFAL 13,151.00 RUNPRD PJSM AND LD PERFORATING BHA -STAND INJECTOR ON LEGS -LD RUNNING TOOLS AND 2-1/16"CSH -STAND BACK 1"CSH -LD PERF GUNS,ALL SHOTS FIRED 10:30 - 13:30 3.00 CASING N DFAL 13,151.00 RUNPRD PJSM AND PU CIBP ASSEMBLY -PU CIBP WITH DUAL BPVS AND SETTING TOOLS -RIH ON 1"CSH FROM DERRICK -MU RUNNING TOOLS AND 2-1/16"CSH -GET ON WELL,PRESS TEST QTS 13:30 - 18:00 4.50 CASING N DFAL 13,151.00 RUNPRD PJSM AND RIH WITH CIBP ASSEMBLY -90'/MIN WITH 0.50/0.80 BPM IN/OUT -SLOW TO 40'/MIN INSIDE LIENR -LIGHT TAG PBTD AT 13,118'MD (UNCORRECTED) 18:00 - 20:30 2.50 CASING N DFAL 13,151.00 RUNPRD PJSM AND SET CIBP -PU TO UP WT PLUS 15'TO 13,100'MD LAUNCH 1/2"STEEL BALL -CIRC AT 0.54/0.51 BPM IN/OUT AND 1710 PSI -PUMP 80 BBLS.ROCK PUMPS.RIH WITHOUT PUMPS 10'.PU TO SETTING DEPTH.COME ON WITH PUMPS. -NO INDICATION OF BALL ON SEAT. 20:30 - 22:00 1.50 CASING N DFAL 13,151.00 RUNPRD PUMP 20 BBLS HI-VIS SWEEP TO CARRY BALL TO SEAT. CIRCULATE 40 BBLS MORE TO GET SWEEP OUT COIL. NO INDICATION OF BALL ON SEAT. 22:00 - 00:00 2.00 CASING N DFAL 13,151.00 RUNPRD PJSM AND LAUNCH 2ND 1/2"PHENOLIC BALL. CIRC AT 0.61/0.58 BPM IN/OUT AND 1980 PSI. CIRCULATE ADDITIONAL 60 BBLS. NO INDICATION OF BALL ON SEAT. Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 4 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/12/2014 00:00 - 01:30 1.50 CASING N DFAL 13,151.00 RUNPRD WORK COIL IN ATTEMPT TO GET BALL ON SEAT I -LINE UP DOWN KILL LINE. POOH TO 12,800'MD PUMPING DOWN ' BACKSIDE.HOLD 250 PSI WHP. -RIH TO 13,110'MD.TAG UP HIGH AT 13,110' MD. -PU TO 13,100'MD AND CIRCULATE 20 BBLS. 1 NO INDICATION OF BALL ON SEAT. 101:30 - 04:30 3.00 1 CASING N DFAL 13,151.00 RUNPRD I DECIDE TO POOH AND INSPECT CIBP ASSEMBLY -30'/MIN FILLING DOWN BACKSIDE. -HOLD 250 PSI WHP WHILE INSIDE LINER. -FLOW CHECK ABOVE LINER.NO FLOW. -100'/MIN FILLING DOWN BACKSIDE TO SURFACE. -FLOW CHECK ON SURFACE,NO FLOW. 04:30 - 07:00 2.50 CASING N DFAL 13,151.00 RUNPRD PJSM AND LD CIBP ASSEMBLY -LD RUNNING TOOLS AND 2-1/16"CSH -STAND BACK 1"CSH -LD CIBP SETTING TOOLS. -BRIDGE PLUG MISSING,(SET @ 13,107'). ' -RECOVERED(1)1/2"STEEL BALL,(1)1/2" PHENOLIC BALL IS MISSING. 07:00 - 08:30 1.50 CASING N DFAL 13,151.00 RUNPRD PJSM.LAUNCH 3/4"BALL IN COIL. -PUMP @ 2.25 BPM/3440 PSI. -BALL HEARD GOING AROUND,PUMP FULL 'COIL VOLUME-40 BBLS. -RECOVERED 1/2"PHENOLIC BALLAND 3/4" STEEL BALL. 08:30 - 10:00 1.50 CASING N DFAL 13,151.00 RUNPRD PJSM.MAKE UP 3"SEAL BORE ASSEMBLY TO !TEST INTEGRITY OF CIBP/PERFORATIONS. STAB ONTO WELL,TEST QTS,OK. 10:00 - 12:30 2.50 CASING N DFAL 13,151.00 RUNPRD PJSM.RIH W/SEAL BORE ASSEMBLY. -RIH PUMPING MINIMUM RATE,TRIP SET. -@ 10,600',DOWN WT=13,500 LBS,UP WT= , 34,000 LBS. -TAG TOP OF LINE @ 10,721'UNCORRECTED - DEPTH.SET DOWN 5000 LBS. 12:30 - 15:30 3.00 CASING N DFAL 13,151.00 RUNPRD PJSM.BREAK CIRCULATION,CIRCULATING DOWN COIL. -CIRCULATING INTO LINER AND AROUND LINER AND UP 4 1/2"X 5 1/2"TUBING. i I-PUMPING 2 BPM @ 3650 PSI,OBSERVED.4 BPM INITIAL LOSS RATE. -LOSS RATE DROPPED TO LESS THAN.1 BPM,PRESSURE INCREASED TO 3700 PSI. -PUMPED(2)BOTTOMS UP=310 BBLS. Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 5 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-26A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 16:00 0.50 CASING N DFAL 13,151.00 RUNPRD WITH SEALS STILL STABBED INTO TOP OF LINER,LINE UP TO REVERSE CIRCULATE, BAKER CHOKE OPENED. -PUMP©.65 BPM @ 1150 PSI DOWN TUBING X LINER ANNULUS. -WITH 6 BBLS PUMPED OBSERVE 1/4"-1/2" STREAM RETURNS UP COIL TUBING. -REPORT FINDINGS TO ODE,INSTRUCTED TO SHUT BAKER CHOKE AND WATCH FOR PRESSURE INCREASE ON COIL. -WHILE REVERSE CIRCULATING AT.65 BPM, OBSERVED PRESSURE ON COIL INCREASE TO 200 PSI IN APPROXIMATELY(2)MINUTES. -REPORT TO ODE.INSTRUCTED TO PUMP 15 BBLS DOWN COIL AND AROUND LINER, TAKING RETURNS UP LINER X TUBING ANNULUS TO PITS. -LINE UP AND PUMP 15 BBLS @ 2 BPM/3650 PSI,RETURNS TO PITS. 16:00 - 18:00 2.00 CASING N DFAL 13,151.00 RUNPRD POOH WITH SEAL ASSEMBLY BHA FLOW CHECK AT SURFACE,NO FLOW 18:00 - 19:00 1.00 CASING N DFAL 13,151.00 RUNPRD PJSM AND LD SEAL ASSEMBLY BHA -POP OFF,STAND BACK INJECTOR -LD 2-1/16"CSH AND SEAL ASSEMBLY 19:00 - 22:30 3.50 CASING N DFAL 13,151.00 RUNPRD PJSM AND PUMP BACK SLACK ' -WSL INSURE SWAB CLOSED AND NIGHT CAP INSTALLED IN COMPLIANCE WITH L2RA FOR HOTWORK ON RIG FLOOR -CUT OFF CTC AND BOOT E-LINE -GET ON WELL,PUMP BACK SLACK -POP OFF,CUT 280'COIL FOR 1.78%SLACK -INSTALL SLB CTC,PULL TEST TO 40K# -GET ON WELL,PUMP SLACK FORWARD -PRESS TEST INJECTOR LUBRICATOR TO 250/3500 PSI 22:30 - 00:00 1.50 CASING ' N DFAL 13,151.00 ' RUNPRD PJSM AND HEAD UP BHI -WSL INSURE SWAB CLOSED AND NIGHT CAP INSTALLED IN COMPLIANCE WITH L2RA FOR HOTWORK ON RIG FLOOR -INSTALL UQC,PRESS TEST UQC AND CTC TO 250/3500 PSI -TEST CHECKS TO 250/3500 PSI -TEST E-LINE CONNECTIVITY TO J-BOX 9/13/2014 00:00 - 03:30 3.50 CASING N DFAL 13,151.00 RUNPRD PJSM AND PU CIBP BHA PU CIBP AND BPV ASSEMLBY WITH 'SETTING TOOL -RIH ON 1"CSH FROM DERRICK -MAKE UP 2-3/8"COIL TRACK -GET ON WELL,PRESS TEST QTS Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 6 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor.NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)©75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 07:45 4.25 CASING N DFAL 13,151.00 RUNPRD RIH WITH CIBP BHA -70'/MIN PUMP MIN RATE THROUGH OPEN EDC -0.38/0.61 BPM IN/OUT WITH 1000 PSI -SLOW TO 30'/MIN INSIDE LINER -TIE-IN WITH MINUS 11'CORRECTION. -CONTINUE IN HOLE,SLOW TO 5 FPM @ 13,075'. -UP WT=35K,DOWN WT=15K.TAG BRIDGE PLUG @ 13,096.7 CORRECTED DEPTH. -THIS CORRELATES TO 13,105.5' UNCORRECTED,AS EXPECTED. -PICK UP TO UP WT,13,094.5'AND ON UP TO 13,089.5'.PARK THERE. 07:45 - 08:00 0.25 CASING N DFAL 13,151.00 RUNPRD PJSM.CLOSE BAKER CHOKE AND EDC VALVE. -BRING ON PUMP AND PRESSURE UP COIL, OBSERVE BRIDGE PLUG SET @ 3100 PSI. -CIRCULATE THROUGH BRIDGE PLUG,2 BBLS AND PICK UP,NO OVER PULL. 08:00 - 11:35 3.58 CASING N DFAL 13,151.00 RUNPRD PJSM.PERFORM INJECTOR CHAIN CHECK, OK. -POOH,FLOW CHECK WELLAT SURFACE, WELL STABLE. 11:35 - 12:30 0.92 CASING N DFAL 13,151.00 RUNPRD PJSM.POP OFF WELL,STAND BACK INJECTOR. -POOH,STAND BACK TUBING.LAY DOWN BRIDGE PLUG RUNNING TOOL. 12:30 - 14:00 1.50 CEMT N DFAL 13,151.00 RUNPRD PJSM.PUMP SLACK OUT OF COIL. -PUMP OUT 258'OF CABLE LEAVING AN ESTIMATED 22 FT OF WIRE IN COIL 14:00 - 15:00 1.00 CEMT N DFAL 13,151.00 RUNPRD PJSM.MAKEUP BAKER COIL CONNECTOR. -PULL TEST TO 35K,OK.PRESSURE TEST, OK. -PJSM TO MAKE UP SEAL ASSEMBLY/ CEMENTING BHA. -MAKE UP CEMENTING BHAAND MAKE UP TO COIL,STAB ON TO WELL. -TEST QTS... 15:00 - 17:15 2.25 CEMT N DFAL 13,151.00 RUNPRD PJSM.RIH W/CEMENTING BHA ON COIL PUMPING MINIMUM RATE. -SLOW DOWN TO 5 FPM @ 10,650'.OBSERVE TAG©10,712.9'AND CORRESPONDING PRESSURE INCREASE ON COIL. Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 7 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UVVI:500292180600 Active datum:Orig_1-KB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations I (hr) I (usft) 17:15 - 18:00 0.75 CEMT N DFAL 13,151.00 RUNPRD SHUT DOWN PUMP AND OPEN BAKER CHOKE,SET DOWN AND OBSERVE SEALS NO GO OUT. , -SET DOWN APPROXIMATELY 2.8 MORE FEET TO 10,715.7,GOOD INDICATION OF SEALS GOING IN. -PJSM.LINE UP TO PUMP DOWN TUBING ANNULUS,BAKER CHOKE CLOSED. -PUMP DOWN ANNULUS,.65 BPM AND OBSERVE WELLHEAD PRESSURE INCREASE TO 1100 PSI. I-PUMPED,(BULLHEADED).APPROXIMATELY (5)BBLS,NO PRESSURE INCREASE OBSERVED ON COIL. -BLEED PRESSURE,UNSTING FROM LINER 1 AND PUMP DOWN ANNULUS. • W/1-1 1/2 BBLS PUMPED,OBSERVE COIL PRESSURE INCREASE TO 200 PSI. -SHUT DOWN PUMP,BLEED OFF PRESSURE 1 AND RE STING INTO LINER TOP AND SET 10K DOWN. 18:00 - 19:00 1.00 CEMT N DFAL 13,151.00 RUNPRD BREAK CIRCULATION AND CIRCULATE WHILE STAGE UP TRUCK FOR DISPLACEMENT • I- -0.60/0.55 BPM IN/OUT WITH 1.580 PSI • 19:00 - 21:00 2.00 ' CEMT P RUNPRD DISPLACE WELL TO 1%KCL -FINAL CIRC PRESSURES: -2750 PSI WITH 2.52/2.50 BPM IN/OUT • 1230 PSI WITH 1.59/1.57 BPM IN/OUT 21:00 - 22:30 1.50 CEMT P RUNPRD CONTINUE TO CIRCULATE WHILE STAGE TRUCK AND PREP PITS FOR CEMENT JOB -OFFLOAD MUD TAKE ON KCL INTO PITS ' STAGE EXHAUST PILL AND CONTAM PILL TRUCKS 22:30 - 23:30 1.00 CEMT P RUNPRD LINE UP AND PUSH KCL TO CEMENTERS . PRESS TEST CEMENTERS TO 250/6000 PSI • FOR 5/5 MIN -WSL COMPLETE PRESSURE CROSSCHECK CHECKLIST -WSL VERIFY FUNTION OF TRIPS 123:30 - 00:00 0.50 CEMT P RUNPRD PJSM FOR CEMENT JOB BATCH UP CEMENT Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 8 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Ong rKB(H-28A)@75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/14/2014 00:00 - 01:00 1.00 CEMT P RUNPRD 00:00 CMT TO WEIGHT AT 15.3 PPG LOSS RATE=0.05 BPM 00:00 SWAP COIL PUMP TO EXHAUST PILL. 00:04 SHUT DOWN RIG PUMP AND LINE UP CMT PUMP DOWN THE COIL. 00:05 ON LINE WITH CMT PUMP WITH 2 BBLS OF KCL @ 800 PSI. 00:06 ON LINE WITH CMT,ZERO IN MM AT 114.0 PPG DENSITY. 00:15 SHUT DOWN PUMP 13.5 BBLS AWAY. LINE UP AND PUSH EXHAUST PILL TO CMT TRUCK. 00:17 ONLINE WITH RIG PUMP TO DISPLACE CMT WITH EXHAUST PILL. 00:19 CAUGHT CMT AT 14.9 BBLS AWAY. -DISPLACE CEMENT TO COIL CONNECTOR. MAX PRESSURE 3982 PSI AT 2.2 BPM. 00:34 44.0 BBLS AWAY REDUCE RATE FROM 2.0 TO 1.2 BPM TO NOT SLAM CIBP. 00:36 48.4 BBLS AWAY,PRESSURE INCREASE WITH CEMENT AT CIBP. -MM IN=48.4 BBLS MM OUT=47.1 BBLS j PUMPING AVG RATE=1.5 BPM @ 2300 PSI PUSHING CMT BEHIND LINER. -LOSSES WHILE PUMP CEMENT TO PERFS= 1.3 BBLS 00:48 PUMP ADDITIONAL 14.0 BBLS TO 62.4 BBLS.SHUT DOWN PUMPS. -MM IN=62.4 BBLS MM OUT=59.9 BBLS -LOSSES WHILE PUMP CEMENT UP ANNULUS=1.2 BBLS -12.3 BBLS OF CMT BEHIND PIPE BASED ON IN/OUT MM. -PRESSURE INCREASE FROM 1300 TO 3500 PSI WITH CEMENT IN ANNULUS. 00:49 BLEED OFF COIL PRESSURE AND CHECK BPV ON CIBP. 00:55 GOOD NO RETURN FLOW,CLOSE THE BAKER CHOKE. 00:57 PU 5'TO UNSTING FROM DEPLOYMENT SLEEVE.CIRC 10 BBLS TO CLEAR CEMENT FROM TOL. 01:00 - 03:00 2.00 CEMT P RUNPRD POOH WITH CEMENTING ASSEMBLY -100'/MIN WITH 1.20/0.78 BPM IN/OUT -FLOW CHECK ON SURFACE,NO FLOW 03:00 - 04:00 1.00 CEMT P RUNPRD PJSM AND LD CEMENTING ASSEMBLY -POP OFF,STAND BACK INJECTOR -LD 2-1/16"CSH AND SEAL ASSEMBLY 04:00 - 07:00 3.00 CLEAN P OTHCMP PJSM AND PU CLEANOUT BHA -PU CLEANOUT AS PER BTT REP -RIH ON 1"CSH,4 JTS 2-1/16"CSH -GET ON WELL,PRESS TEST QTS -BLOW DOWN KILL LINE,FILL HOLE. 07:00 - 08:45 1.75 CLEAN P OTHCMP PJSM.RIH W/CLEAN OUT BHA ON COIL. -PUMPING MIN RATE W/RIH. -STOP @ 10,600',(ABOVE LINER TOP). Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 9 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UW:500292180600 Active datum:Orig rKB(H-28A)@75.38usft(above Mean Sea Level) ' Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) I 08:45 - 10:00 1 1.25 CLEAN 1 P OTHCMP CONSULT CEMENTERS. -TIME TO 500 PSI COMPRESSIVE STRENGTH =9 HRS FROM CIP TIME. -CONDUCT EVACUATION DRILL,(H2S ! I RELEASE&MAN DOWN). 2 MINUTES 38 SECONDS TO GOOD HEAD COUNT.AAR.GOOD RESPONSE. 10:00 - 12:15 2.25 CLEAN P OTHCMP PJSM.CLEANOUT LINER. -BRING ON PUMP TO 1.2 BPM @ 2285 PSI AND RIH. -RUN IN HOLE @ 20 FPM,TAG @ 13,103.9', (UNCORRECTED). NO CEMENT SEEN OR MOTOR WORK OBSERVED PRIOR TO TAGGING BRIDGE PLUG. 12:15 - 15:00 2.75 CLEAN P OTHCMP PJSM.POOH W/CLEAN OUT ASSEMBLY ON 1 COIL. -PAINT EOP FLAG @ 10,238',(YELLOW). -FLOW CHECK @ TOP OF LINER,WELL STABLE. I-PAING EOP FLAG @ 7838',(RED). '-TABLE TOP KICK WHILE DRILLING DRILL. 15:00 - 18:00 3.00 CLEAN P OTHCMP PJSM.FLOW CHECK AND POP OFF WELL. STAND BACK INJECTOR. 1 1 I '-PUMP 1/2"BALL TO OPEN CIRC SUB FOR I DRY PIPE. -POOH AND STAND BACK 1"CS HYDRIL TUBING. P_ -OOH,RECOVERED 1/2"BALL. 18:00 - 18:30 1 0.50 CLEAN P OTHCMP ALLOW FOR CREW CHANGE OUT,PRETOUR WALKAROUNDS 18:30 - 19:00 0.50 BOPSUR P OTHCMP FUNCTION TEST BOPS 119:00 - 22:30 3.50 EVAL P � OTHCMP PJSM AND PU LOGGING BHA '-PU LOGGING TOOLS PER BOT REP -RUN ON 1"CSH FROM DERRICK -PU RUNNING TOOLS AND 2-1/16"CSH -GET ON WELL,PRESS TEST QTS 22:30 - 00:00 1.50 EVAL P OTHCMP RIH WITH LOGGING TOOLS TO 10,500'MD -90'/MIN WITH 0.51/0.82 BPM IN/OUT 9/15/2014 '00:00 - 04:00 4.00 EVAL P OTHCMP LOG LINER PER PLAN ' LOG DOWN FROM 10,500'MD AT 30'/MIN -TAG TOP OF CIBP AT 13,104.5'MD (UNCORRECTED) i LOG UP FROM 13,104.5'MD TO 10,500'MD AT 20'/MIN -PAINT FLAG FOR PERFORATING RUN AT 10,300'EOP -LAY IN 120K LSRV PERF PILL INSIDE LINER 04:00 - 06:00 I 2.00 EVAL P OTHCMP POOH FROM 10,500'MD -60'/MIN WITH 1.50/1.25 BPM IN/OUT -DISPLACE WELL ABOVE LINER TO 1%KCL -FLOW CHECK ON SURFACE,NO FLOW 06:00 - 09:45 3.75 : EVAL P OTHCMP PJSM W/ALL PERSONEL INVOLVED. -POP OFF WELLAND STAND BACK INJECTOR. -PJSM W/REGARD TO LOGGING TOOLS.LAY DOWN(4)JTS 2 1/16"HYDRIL TUBING. -LAY DOWN 16 JTS OF 1"CS HYDRIL AND STAND BACK 32 STANDS,(64 JTS). -LAY DOWN LOGGING TOOLS. Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 10 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UW:500292180600 Active datum:Orig rKB(H-28A)©75.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:45 - 11:15 1.50 EVAL P OTHCMP PJSM.INSTALL NIGHT CAP AND LINE UP TO TEST LINER. -BRING ON PUMP,TEST LINER LAP©250 PSI/5 MINUTES,CHARTED,OK. STAGE UP TO 1925 PSI,1.6 BBLS PUMPED, (CALCULATED 1.5 TO ACHIEVE TEST PRESSURE). -OBSERVED 100 PSI IN FIRST(9)MINUTES, REPRESSURE UP TO 1925 PSI AND ISOLATE TOTALLY. -OBSERVE 125 PSI BLEED OFF IN FIRST 15 MINUTES TO 1800 PSI. 1-23 MINUTES INTO THE TEST HAD BLED OFF TO 1750 PSI AND ABRUPTLY BLED OFF TO 1400 PSI IN FINAL 7 MINUTES. -TEST FAILED,DATA SENT TO TOWN. 11:15 - 15:30 4.25 PERF P OTHCMP PERFORATORS ON LOCATION. PJSM.LOAD GUNS IN PIPE SHED. -WSL VERIFIES PROPER ORDER AND INSPECTS GUNS WITH PERFORATING HAND. -PJSM WITH ALL HANDS WITH REGARD TO 'PICK UP PERF GUNS. -FLOW CHECK WELL,WELL STABLE. RUN GUNS,MAKE UP FIRING HEAD AND CROSSOVER. -RIH W/ 10 JTS 1"CS HYDRILTBG,MARKER PUP AND 54 JTS 1"CS HYDRIL TUBING. -HI LOAD DISCO,DUAL BPV,(4)JTS 2 1/16" HYDRIL TBG,BAKER QUICK CONNECT AND ASSOCIATED X OVERS. -OVERALL LENGTH=2,666.94'. 15:30 - 19:00 3.50 PERF P OTHCMP PJSM.PICK UP INJECTOR AND STAB ONTO WELL. -TEST STS @ 250/3500 PSI,OK. -RIH W/PERF GUNS ON 2"COIL PUMPING MIN RATE,(0.65 BPM @ 1000 PSI). 19:00 - 20:00 1.00 PERF P OTHCMP SET PERF GUNS ON DEPTH AND PERFORATE -SEE FLAG AT 12,974'MD(-10'CORRECTION) -TAG PBTD AT 13,104'MD(-7'CORRECTION) -TAKE UP WT=33K# -TAG AND CONFIRM PBTD AT 13,104'MD PU TO UP WT AT 13,102'MD.CORRECT DEPTH TO 13,097'MD. -PU TO 13,087'MD.PERFORM E-FIRE SEQUENCE. -FIRE GUNS WHILE PU SLOWLY.FIRE GUNS ON DEPTH AT 13,085'MD. -GOOD INDICATION OF GUNS FIRE 20:00 - 23:00 3.00 PERF P OTHCMP POOH WITH PERFORATING ASSEMBLY -30'/MIN WITH 0.94/0.78 BPM -HOLD 250 PSI WHP WHILE INSIDE LINER -FLOW CHECK ABOVE LINER,NO FLOW POOH WITH PERFORATING ASSEMBLY -80'/MIN WITH 0.70/0.29 BPM IN/OUT -FLOW CHECK ON SURFACE,NO FLOW 23:00 - 00:00 1.00 PERF P OTHCMP PJSM AND LD PERFORATING ASSEMBLY -POP OFF AND STAND BACK INJECTOR LD 2-1/16"CSH,RUNNING TOOLS,LD 1"CSH Printed 9/29/2014 2:11:46PM North America-ALASKA-BP Page 11 of 11 Operation Summary Report Common Well Name:H-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/9/2014 End Date: X3-014VC-C:(1,517,874.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 2 Spud Date/Time: Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292180600 Active datum:Orig rKB(H-28A)0275.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/16/2014 00:00 - 03:00 3.00 PERF P OTHCMP CONTINUE LD PERFORATING BHA -LD1"CSH -LD PERF GUNS,ALL SHOTS FIRED -CLEAN AND CLEAR RIG FLOOR,OFFLOAD SLB TCP EQUIPMENT 03:00 - 04:00 1.00 DEMOB P POST PJSM AND PICK UP NEW BLOCKS -PU SHEAVE ASSEMBLY PU SWIVEL/HOOK ASSEMBLY -STAGE TO SIDE ON RIG FLOOR 04:00 - 05:30 1.50 BOPSUR P POST PJSM AND RIG UP TO FREEZE PROTECT -STAGE DIESEL TRUCK ON CHARGE PUMP -MU UP NOZZLE ASSEMBLY -GET ON WELL,PRESS TEST QTS 05:30 - 07:00 1.50 BOPSUR P POST FREEZE PROTECT WELL TO 2500'MD WITH 60 BBLS DIESEL -RIH TO 2500'MD 100'/MIN WITH 1.8 BPM -CIRCULATE DIESEL TO THE NOZZLE -POOH LAYING IN FREEZE PROTECT -75'/MIN WITH 1.80/1.50 BPM IN/OUT 07:00 - 10:00 3.00 BOPSUR P POST FILL COIL,INHIBITOR RIG UP NITROGEN,TEST AND BLOW DOWN REEL BLEED OFF WELL HEAD PRESSURE TO 0 PSI 10:00 - 14:00 4.00 WHSURP POST -RIG UP TO SET TWC PRESSURE TEST LUBRICATOR SET TWC RIG DOWN LUBRICATOR 14:00 - 16:00 2.00 DEMOB- P POST INSTALL GRAPPLE,PULL TEST PULL COIL BACK AND SECURE TO REEL 16:00 - 17:00 1.00 DEMOB P POST LOWER REEL AND SECURE TO TRUCK. 17:00 - 21:30 4.50 BOPSUR. P POST INSPECT AND CHANGE OUT RAMS FROM 1" TO 2-3/8 COMBI 21:30 - 22:30 1.00 DEMOB N RREP POST SCOPE DOWN DERRICK • 22:30 - 00:00 1.50 DEMOB N RREP POST PJSM,BEGIN CHANGE OUT TRAVELING BLOCKS 9/17/2014 00:00 - 05:30 5.50 DEMOB N RREP POST CONTINUE TO CHANGE OUT TRAVELING BLOCKS. RE STRING AND PICK UP NEW BLOCKS AND HOOK PJSM OFFLOAD OLD TRAVELING BLOCKS AND HOOK FROM RIG FLOOR THROUGH BEAVER SLIDE. 05:30 - 08:00 2.50 BOPSUR P POST PJSM.ND BOPE. 08:00 - 09:30 1.50 WHSUR P POST PJSM NU AND TEST TREE CAP TO 250/3500 PSI FOR 5 CHARTED MIN,GOOD TEST. 09:30 - 11:00 1.50 DEMOB P POST PJSM FOR PULLING OFF WELL CONFIRM 0 PSI ON IA,OA AND TREE CAP. MOVE RIG OFF WELL,RELEASE RIG FROM H-28 AT 11:00 9/17/14 REMOVE LOTO ON Q-07. Printed 9/29/2014 2:11:46PM 0 by North America - ALASKA - BP Prudhoe Bay PB H Pad H-28 500292180600 H-28APB1 Design: H-28APB1 Survey Report - Geographic 11 September, 2014 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28 Project: Prudhoe Bay TVD Reference: Orig rKB(H-28A)@ 75.38usft(Orig RKB) Site: PB H Pad MD Reference: Ong rKB(H-28A)@ 75.38usft(Orig RKB) ' Well: H-28 North Reference: True Wellbore: H-28APB1 Survey Calculation Method: Minimum Curvature Design: H-28APB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB H Pad,TR-11-13 Site Position: Northing: 5,957,572.25 usft Latitude: 70°17 30.055 N From: Map Easting: 641,366.07usft Longitude: 148°51'19.80 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.08 ° Well H-28 API No. 500292180600 Well Position +NI-S 0.00 usft Northing: 5,959,546.00 usft , Latitude: 70°17 49.100 N +E/-W 0.00 usft Easting: 643,323.00 usft • Longitude: 148°50'21.68 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 44.80 usft • Wellbore H-28APB1 API no. 500292180670 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) I BGGM2013 8/30/2014 19.57 80.99 57,621 Design H-28APB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 11,400.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 32.38 0.00 0.00 49.51 Survey Program Date: 9/11/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 11,400.00 1:Sperry-Sun BOSS gyro multi(H-28) BOSS-GYRO Sperry-Sun BOSS gyro multishot 11,409.50 11,510.12 INC+TREND(H-28APB1) INC+TREND Inclinometer+known azi trend 11,540.06 13,220.00 MWD(H-28APB1) MWD MWD-Standard 9/11/2014 12:59:54PM Page 2 COMPASS 5000.1 Build 61 ()bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28 Project: Prudhoe Bay TVD Reference: Orig rKB(H-28A)@ 75.38usft(Orig RKB) Site: PB H Pad MD Reference: Orig rKB(H-28A)@ 75.38usft(Orig RKB) Well: H-28 North Reference: True Wellbore: H-28APB1 Survey Calculation Method: Minimum Curvature Design: H-28APB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +El-W Northing Easting (usft) (e) (e) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,400.00 50.37 57.39 8,579.16 4,090.69 5,397.11 5,963,738.55 648,640.71 70°18'29.313 N 148°47'44.28 W 1 H-28APB1 TIP 11,409.50 • 50.46 57.40 8,585.21 4,094.63 5,403.28 5,963,742.61 648,646.80 70°18'29.352 N 148°47'44.10 W H-28APB1 KOP 11,425.09 47.10 55.00 8,595.48 4,101.15 5,413.02 5,963,749.31 648,656.42 70°18'29.416 N 148°47'43.82 W Interpolated Azimuth 11,450.43 43.34 49.00 8,613.34 4,112.19 5,427.20 5,963,760.62 648,670.38 70°18'29.524 N 148°47'43.40 W Interpolated Azimuth 11,480.17 38.64 42.00 8,635.79 4,125.80 5,441.13 5,963,774.49 648,684.05 70°18'29.658 N 148°47'43.00 W Interpolated Azimuth 11,510.12 35.98 33.00 8,659.63 4,140.14 5,452.19 5,963,789.04 648,694.83 70°18'29.799 N 148°47'42.67 W Interpolated Azimuth 11,540.06 33.78 23.02 8,684.21 4,155.19 5,460.24 5,963,804.24 648,702.60 70°18'29.947 N 148°47'42.44 W 11,570.29 31.49 14.38 8,709.68 4,170.58 5,465.49 5,963,819.73 648,707.55 70°18'30.098 N 148°47'42.28 W 11,603.16 31.08 1.25 8,737.80 4,187.40 5,467.81 5,963,836.59 648,709.55 70°18'30.264 N 148°47'42.22 W 11,629.93 31.01 351.25 8,760.75 4,201.14 5,466.92 5,963,850.30 648,708.39 70°18'30.399 N 148°47'42.24 W 11,660.02 32.23 341.73 8,786.39 4,216.43 5,463.22 5,963,865.51 648,704.40 70°18'30.549 N 148°47'42.35 W 11,690.11 32.68 333.29 8,811.80 4,231.31 5,457.05 5,963,880.28 648,697.95 70°18'30.695 N 148°47'42.53 W 11,720.05 34.21 326.01 8,836.79 4,245.52 5,448.71 5,963,894.32 648,689.34 70°18'30.835 N 148°47'42.77 W 11,750.09 36.83 319.10 8,861.24 4,259.33 5,438.08 5,963,907.93 648,678.46 70°18'30.971 N 148°47'43.08 W 11,775.05 39.18 314.53 8,880.91 4,270.52 5,427.56 5,963,918.91 648,667.72 70°18'31.081 N 148°47'43.39 W 11,800.17 42.79 313.17 8,899.87 4,281.92 5,415.68 5,963,930.09 648,655.63 70°18'31.194 N 148°47'43.73 W 11,830.25 47.00 317.48 8,921.18 4,297.03 5,400.78 5,963,944.91 648,640.45 70°18'31.342 N 148°47'44.17 W 11,860.29 51.01 319.66 8,940.89 4,314.03 5,385.79 5,963,961.62 648,625.14 70°18'31.510 N 148°47'44.61 W 11,891.18 55.16 321.41 8,959.44 4,333.10 5,370.11 5,963,980.39 648,609.09 70°18'31.697 N 148°47'45.06 W 11,920.15 58.14 326.68 8,975.37 4,352.69 5,355.93 5,963,999.70 648,594.54 70°18'31.890 N 148°47'45.48 W 11,950.25 60.94 330.06 8,990.63 4,374.78 5,342.33 5,964,021.52 648,580.53 70°18'32.107 N 148°47'45.87 W 11,980.28 65.31 332.91 9,004.20 4,398.31 5,329.56 5,964,044.81 648,567.31 70°18'32.339 N 148°47'46.24 W 12,010.21 69.42 336.68 9,015.72 4,423.30 5,317.81 5,964,069.56 648,555.09 70°18'32.585 N 148°47'46.59 W 12,040.11 73.80 341.33 9,025.16 4,449.78 5,307.67 5,964,095.84 648,544.44 70°18'32.845 N 148°47'46.88 W 12,070.43 78.00 344.76 9,032.55 4,477.90 5,299.10 5,964,123.79 648,535.34 70°18'33.122 N 148°47'47.13 W 12,100.30 82.31 348.95 9,037.65 4,506.55 5,292.42 5,964,152.31 648,528.12 70°18'33.404 N 148°47'47.32 W 12,130.32 85.92 351.45 9,040.73 4,535.97 5,287.34 5,964,181.62 648,522.48 70°18'33.693 N 148°47'47.47 W 12,160.43 91.41 355.64 9,041.43 4,565.86 5,283.96 5,964,211.44 648,518.53 70°18'33.987 N 148°47'47.57 W 12,200.29 96.18 0.00 9,038.80 4,605.58 5,282.44 5,964,251.12 648,516.25 70°18'34.378 N 148°47'47.61 W 12,220.18 95.01 2.68 9,036.86 4,625.37 5,282.91 5,964,270.92 648,516.34 70°18'34.572 N 148°47'47.60 W 12,250.28 91.10 6.76 9,035.25 4,655.31 5,285.38 5,964,300.90 648,518.24 70°18'34.867 N 148°47'47.53 W 12,275.58 88.77 11.26 9,035.28 4,680.29 5,289.34 5,964,325.95 648,521.73 70°18'35.112 N 148°47'47.41 W 12,304.47 86.87 16.08 9,036.38 4,708.34 5,296.16 5,964,354.11 648,528.01 70°18'35.388 N 148°47'47.21 W 12,330.37 84.77 18.70 9,038.27 4,732.98 5,303.88 5,964,378.90 648,535.26 70°18'35.630 N 148°47'46.99 W 12,360.49 87.42 11.29 9,040.32 4,761.99 5,311.65 5,964,408.04 648,542.47 70°18'35.916 N 148°47'46.76 W 12,380.58 89.72 7.09 9,040.82 4,781.81 5,314.85 5,964,427.92 648,545.29 70°18'36.111 N 148°47'46.66 W 12,405.27 90.40 2.95 9,040.80 4,806.40 5,317.01 5,964,452.55 648,546.98 70°18'36.352 N 148°47'46.60 W 12,430.57 90.06 5.58 9,040.70 4,831.62 5,318.89 5,964,477.80 648,548.38 70°18'36.601 N 148°47'46.55 W 12,460.31 90.80 8.96 9,040.47 4,861.12 5,322.66 5,964,507.36 648,551.58 70°18'36.891 N 148°47'46.44 W 12,490.11 92.55 13.96 9,039.60 4,890.30 5,328.57 5,964,536.65 648,556.94 70°18'37.178 N 148°47'46.26 W 12,510.19 93.74 16.06 9,038.50 4,909.67 5,333.76 5,964,556.11 648,561.76 70°18'37.368 N 148°47'46.11 W 12,540.92 93.35 19.35 9,036.60 4,938.88 5,343.09 5,964,585.49 648,570.53 70°18'37.655 N 148°47'45.84 W 12,570.23 91.38 23.99 9,035.39 4,966.09 5,353.90 5,964,612.90 648,580.82 70°18'37.923 N 148°47'45.52 W 12,600.27 90.64 27.81 9,034.86 4,993.10 5,367.02 5,964,640.16 648,593.42 70°18'38.188 N 148°47'45.14 W 12,630.39 96.89 33.96 9,032.88 5,018.87 5,382.43 5,964,666.21 648,608.33 70°18'38.442 N 148°47'44.69 W 12,660.28 95.66 40.30 9,029.61 5,042.55 5,400.35 5,964,690.22 648,625.80 70°18'38.674 N 148°47'44.17 W 12,690.40 92.33 47.33 9,027.51 5,064.21 5,421.14 5,964,712.28 648,646.17 70°18'38.887 N 148°47'43.56 W 12,720.34 93.75 53.46 9,025.92 5,083.26 5,444.16 5,964,731.76 648,668.82 70°18'39.074 N 148°47'42.89 W 9/11/2014 12:59.54PM Page 3 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28 Project: Prudhoe Bay TVD Reference: Orig rKB(I-1-28A)@ 75.38usft(Orig RKB) Site: PB H Pad MD Reference: Orig rKB(H-28A)@ 75.38usft(Orig RKB) Well: H-28 North Reference: True Wellbore: H-28APB1 Survey Calculation Method: Minimum Curvature Design: H-28APB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (^) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 12,750.38 91.10 58.42 9,024.65 5,100.06 5,469.02 5,964,749.03 648,693.35 70°18'39.239 N 148°47'42.16 W 12,780.33 89.69 64.33 9,024.44 5,114.40 5,495.30 5,964,763.87 648,719.35 70°18'39.380 N 148°47'41.39 W 12,811.15 90.98 72.11 9,024.26 5,125.83 5,523.89 5,964,775.84 648,747.72 70°18'39.493 N 148°47'40.56 W 12,840.16 90.12 79.42 9,023.98 5,132.96 5,551.99 5,964,783.50 648,775.67 70°18'39.562 N 148°47'39.74 W 12,870.07 90.55 86.22 9,023.81 5,136.69 5,581.65 5,964,787.80 648,805.25 70°18'39.599 N 148°47'38.88 W 12,900.15 88.99 93.30 9,023.93 5,136.82 5,611.71 5,964,788.50 648,835.30 70°18'39.600 N 148°47'38.00 W 12,930.07 90.55 99.92 9,024.05 5,133.38 5,641.41 5,964,785.63 648,865.06 70°18'39.566 N 148°47'37.13 W 12,960.57 90.46 105.94 9,023.78 5,126.55 5,671.12 5,964,779.37 648,894.90 70°18'39.499 N 148°47'36.27 W 12,990.29 89.05 112.66 9,023.91 5,116.74 5,699.16 5,964,770.09 648,923.11 70°18'39.402 N 148°47'35.45 W 13,020.25 88.37 118.70 9,024.58 5,103.76 5,726.14 5,964,757.64 648,950.33 70°18'39.274 N 148°47'34.66 W 13,040.75 87.45 117.62 9,025.33 5,094.10 5,744.20 5,964,748.32 648,968.57 70°18'39.179 N 148°47'34.13 W 13,071.31 90.12 113.30 9,025.98 5,080.97 5,771.78 5,964,735.72 648,996.39 70°18'39.049 N 148°47'33.33 W 13,100.17 88.96 108.00 9,026.21 5,070.79 5,798.77 5,964,726.06 649,023.58 70°18'38.949 N 148°47'32.54 WI 13,130.30 89.82 104.28 9,026.53 5,062.42 5,827.71 5,964,718.24 649,052.66 70°18'38.867 N 148°47'31.70 W 13,160.45 87.70 97.07 9,027.18 5,056.84 5,857.31 5,964,713.23 649,082.36 70°18'38.812 N 148°47'30.84 W 13,190.17 90.55 94.25 9,027.64 5,053.91 5,886.87 5,964,710.86 649,111.98 70°18'38.782 N 148°47'29.97 W •13,220.00 96.27 93.88 9,025.86 . 5,051.80 5,916.56 5,964,709.32 649,141.70 70°18'38.762 N 148°47'29.11 W 9/11/2014 12:59:54PM Page 4 COMPASS 5000.1 Build 61 bp North America - ALASKA - BP Prudhoe Bay PB H Pad H-28 500292180600 H-28A Design: H-28A Survey Report - Geographic 11 September, 2014 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28 Project: Prudhoe Bay TVD Reference: Orig rKB(H-28A)@ 75.38usft(Orig RKB) Site: PB H Pad MD Reference: Orig rKB(H-28A)@ 75.38usft(Orig RKB) Well: H-28 North Reference: True Wellbore: H-28A Survey Calculation Method: Minimum Curvature Design: H-28A Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB H Pad,TR-11-13 Site Position: Northing: 5,957,572.25 usft Latitude: 70°17'30.055 N From: Map Easting: 641,366.07 usft Longitude: 148°51'19.80 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.08 ° I_. Well H-28 API No. 500292180600 Well Position +N/-S 0.00 usft Northing: 5,959,546.00 usft Latitude: 70°17 49.100 N +El-W 0.00 usft Easting: 643,323.00 usft Longitude: 148°50'21.68 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 44.80 usft Wellbore H-28A API no. 500292180601 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2014 9/5/2014 19.61 80.99 57,599 1 Design H-28A Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 11,400.00 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 32.38 0.00 0.00 49.49 Survey Program Date: 9/11/2014 I From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 11,400.00 1 :Sperry-Sun BOSS gyro multi(H-28) BOSS-GYRO Sperry-Sun BOSS gyro multishot 11,409.50 11,510.12 INC+TREND(H-28APB1) INC+TREND Inclinometer+known azi trend 11,540.06 11,950.25 MWD(H-28APB1) MWD MWD-Standard 11,950.50 13,101.40 MWD(H-28A) MWD MWD-Standard 9/11/2014 12:45:59PM Page 2 COMPASS 5000.1 Build 61 • 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28 Project: Prudhoe Bay TVD Reference: Orig rKB(I•l-28A)@ 75.38usft(Orig RKB) Site: PB H Pad MD Reference: Orig rKB(H-28A)@ 75.38usft(Orig RKB) Well: H-28 North Reference: True Wellbore: H-28A Survey Calculation Method: Minimum Curvature Design: H-28A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +Ei-W Northing Easting (usft) t°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,400.00 50.37 57.39 8,579.16 4,090.69 5,397.11 5,963,738.55 648,640.71 70°18'29.313 N 148°4T 44.28 W H-28APB1 TIP 11,409.50 50.46 57.40 8,585.21 4,094.63 5,403.28 5,963,742.61 648,646.80 70°18'29.352 N 148°47'44.10 W H-28ABP1 KOP 11,425.09 47.10 55.00 8,595.48 4,101.15 5,413.02 5,963,749.31 648,656.42 70°18'29.416 N 148°47'43.82 W Interpolated Azimuth 11,450.43 43.34 49.00 8,613.34 4,112.19 5,427.20 5,963,760.62 648,670.38 70°18'29.524 N 148°47'43.40 W Interpolated Azimuth 11,480.17 38.64 42.00 8,635.79 4,125.80 5,441.13 5,963,774.49 648,684.05 70°18'29.658 N 148°47'43.00 W Interpolated Azimuth 11,510.12 35.98 33.00 8,659.63 4,140.14 5,452.19 5,963,789.04 648,694.83 70°18'29.799 N 148°47'42.67 W Interpolated Azimuth 11,540.06 33.78 23.02 8,684.21 4,155.19 5,460.24 5,963,804.24 648,702.60 70°18'29.947 N 148°47'42.44 W 11,570.29 31.49 14.38 8,709.68 4,170.58 5,465.49 5,963,819.73 648,707.55 70°18'30.098 N 148°47'42.28 W 11,603.16 31.08 1.25 8,737.80 4,187.40 5,467.81 5,963,836.59 648,709.55 70°18'30.264 N 148°47'42.22 W 11,629.93 31.01 351.25 8,760.75 4,201.14 5,466.92 5,963,850.30 648,708.39 70°18'30.399 N 148°47'42.24 W 11,660.02 32.23 341.73 8,786.39 4,216.43 5,463.22 5,963,865.51 648,704.40 70°18'30.549 N 148°47'42.35 W I 11,690.11 32.68 333.29 8,811.80 4,231.31 5,457.05 5,963,880.28 648,697.95 70°18'30.695 N 148°47'42.53 W 11,720.05 34.21 326.01 8,836.79 4,245.52 5,448.71 5,963,894.32 648,689.34 70°18'30.835 N 148°47 42.77 W 11,750.09 36.83 319.10 8,861.24 4,259.33 5,438.08 5,963,907.93 648,678.46 70°18'30.971 N 148°47'43.08 W 11,775.05 39.18 314.53 8,880.91 4,270.52 5,427.56 5,963,918.91 648,667.72 70°18'31.081 N 148°47'43.39 W 11,800.17 42.79 313.17 8,899.87 4,281.92 5,415.68 5,963,930.09 648,655.63 70°18'31.194 N 148°47'43.73 W 11,830.25 47.00 317.48 8,921.18 4,297.03 5,400.78 5,963,944.91 648,640.45 70°18'31.342 N 148°47'44.17 W 11,860.29 51.01 319.66 8,940.89 4,314.03 5,385.79 5,963,961.62 648,625.14 70°18'31.510 N 148°47'44.61 W 11,891.18 55.16 321.41 8,959.44 4,333.10 5,370.11 5,963,980.39 648,609.09 70°18'31.697 N 148°47'45.06 W 11,920.15 58.14 326.68 8,975.37 4,352.69 5,355.93 5,963,999.70 648,594.54 70°18'31.890 N 148°47'45.48 W 11,950.25 60.94 330.06 8,990.63 4,374.78 5,342.33 5,964,021.52 648,580.53 70°18'32.107 N 148°47'45.87 W' H-28A TIP 11,950.50 60.98 330.08 8,990.75 4,374.97 5,342.22 5,964,021.71 648,580.41 70°18'32.109 N 148°47 45.87 W 11,969.61 65.12 326.01 8,999.41 4,389.41 5,333.20 5,964,035.97 648,571.12 70°18'32.251 N 148°47'46.14 W 12,000.49 70.23 321.19 9,011.15 4,412.37 5,316.25 5,964,058.61 648,553.73 70°18'32.477 N 148°47'46.63 W 12,029.40 76.70 325.21 9,019.37 4,434.56 5,299.67 5,964,080.47 648,536.74 70°18'32.696 N 148°47'47.11 W 12,065.42 84.04 327.26 9,025.39 4,464.06 5,279.95 5,964,109.59 648,516.46 70°18'32.986 N 148°47'47.69 W 12,095.76 89.63 331.09 9,027.07 4,490.06 5,264.44 5,964,135.29 648,500.46 70°18'33.242 N 148°47'48.14 W 12,120.33 90.77 336.31 9,026.98 4,512.08 5,253.56 5,964,157.09 648,489.16 70°18'33.458 N 148°47'48.46 W 12,150.14 92.06 342.49 9,026.25 4,539.96 5,243.08 5,964,184.77 648,478.15 70°18'33.733 N 148°47'48.76 WI 12,182.44 91.66 348.47 9,025.20 4,571.20 5,234.99 5,964,215.84 648,469.47 70°18'34.040 N 148°47'49.00 W 12,210.46 91.57 354.41 9,024.41 4,598.88 5,230.82 5,964,243.44 648,464.77 70°18'34.312 N 148°47'49.12 W 12,240.52 90.28 0.24 9,023.92 4,628.89 5,229.42 5,964,273.42 648,462.80 70°18'34.607 N 148°47'49.16 W 12,270.23 89.17 5.53 9,024.06 4,658.55 5,230.92 5,964,303.10 648,463.73 70°18'34.899 N 148°47'49.12 W 12,300.59 90.83 10.58 9,024.06 4,688.60 5,235.17 5,964,333.22 648,467.41 70°18'35.194 N 148°47'48.99 W 12,330.44 90.21 16.96 9,023.79 4,717.58 5,242.27 5,964,362.32 648,473.95 70°18'35.479 N 148°47'48.78 W 12,359.92 90.77 23.63 9,023.54 4,745.21 5,252.49 5,964,390.15 648,483.64 70°18'35.751 N 148°47'48.48 W 12,390.06 91.38 28.52 9,022.98 4,772.27 5,265.73 5,964,417.45 648,496.36 70°18'36.017 N 148°47'48.10 W 12,421.08 89.26 32.69 9,022.80 4,798.96 5,281.52 5,964,444.44 648,511.64 70°18'36.280 N 148°47'47.64 W 12,450.67 88.74 40.09 9,023.32 4,822.76 5,299.06 5,964,468.56 648,528.72 70°18'36.513 N 148°47'47.12 W 12,480.79 87.24 43.03 9,024.38 4,845.28 5,319.02 5,964,491.46 648,548.25 70°18'36.735 N 148°47'46.54 W 12,510.60 88.68 36.35 9,025.44 4,868.19 5,338.04 5,964,514.73 648,566.83 70°18'36.960 N 148°47'45.99 W 12,541.05 89.42 28.56 9,025.94 4,893.87 5,354.36 5,964,540.70 648,582.66 70°18'37.212 N 148°47'45.51 W 12,566.42 90.77 24.57 9,025.90 4,916.55 5,365.71 5,964,563.60 648,593.56 70°18'37.435 N 148°47'45.18 W 12,590.62 91.26 30.57 9,025.47 4,937.99 5,376.90 5,964,585.25 648,604.35 70°18'37.646 N 148°47'44.85 W 12,621.98 90.43 38.59 9,025.01 4,963.79 5,394.68 5,964,611.37 648,621.63 70°18'37.900 N 148°47'44.33 W 12,651.05 89.48 45.05 9,025.03 4,985.44 5,414.06 5,964,633.39 648,640.59 70°18'38.113 N 148°47'43.77 W 12,680.63 89.75 51.77 9,025.23 5,005.06 5,436.17 5,964,653.43 648,662.32 70°18'38.305 N 148°47'43.12 W 9/11/2014 12:45:59PM Page 3 COMPASS 5000.1 Build 61 4 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28 Project: Prudhoe Bay TVD Reference: Orig rKB(H-28A)@ 75.38usft(Orig RKB) Site: PB H Pad MD Reference: Orig rKB(H-28A)@ 75.38usft(Orig RKB) Well: H-28 North Reference: True Wellbore: H-28A Survey Calculation Method: Minimum Curvature Design: H-28A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N1-S +E/-W Northing Easting (usft) (0) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 12,710.94 89.05 47.70 9,025.55 5,024.65 5,459.29 5,964,673.45 648,685.06 70°18'38.498 N 148°47'42.45 W 12,740.53 88.77 54.88 9,026.11 5,043.14 5,482.36 5,964,692.38 648,707.77 70°18'38.680 N 148°47'41.77 W 12,770.72 93.07 61.55 9,025.63 5,059.02 5,508.00 5,964,708.75 648,733.10 70°18'38.836 N 148°47'41.03 W 12,800.58 93.99 68.68 9,023.79 5,071.56 5,535.01 5,964,721.79 648,759.87 70°18'38.959 N 148°47'40.24 W 12,830.70 92.03 77.14 9,022.20 5,080.39 5,563.74 5,964,731.17 648,788.42 70°18'39.045 N 148°47'39.40 W 12,860.62 90.52 85.19 9,021.53 5,084.98 5,593.27 5,964,736.32 648,817.86 70°18'39.090 N 148°47'38.54 W 12,890.66 89.79 94.29 9,021.45 5,085.11 5,623.28 5,964,737.03 648,847.86 70°18'39.091 N 148°47'37.66 W 12,920.74 90.37 103.45 9,021.41 5,080.48 5,652.97 5,964,732.96 648,877.62 70°18'39.046 N 148°47'36.80 W 12,950.40 89.35 111.47 9,021.48 5,071.59 5,681.24 5,964,724.61 648,906.06 70°18'38.958 N 148°47'35.97 W 12,980.52 88.99 106.14 9,021.92 5,061.88 5,709.74 5,964,715.45 648,934.73 70°18'38.862 N 148°47'35.14 W' 13,010.27 89.39 101.49 9,022.34 5,054.78 5,738.61 5,964,708.91 648,963.74 70°18'38.792 N 148°47'34.30 W 13,040.27 90.64 97.32 9,022.33 5,049.88 5,768.20 5,964,704.57 648,993.41 70°18'38.744 N 148°47'33.44 W 13,070.25 92.58 105.24 9,021.49 5,044.02 5,797.57 5,964,699.28 649,022.88 70°18'38.686 N 148°47'32.58 W 13,101.40 91.93 110.96 9,020.26 5,034.36 5,827.14 5,964,690.18 649,052.63 70°18'38.591 N 148°47'31.72 W 13,150.00 91.93 110.96 9,018.63 5,016.98 5,872.50 5,964,673.67 649,098.31 70°18'38.419 N 148°47'30.39 W Projection to TD Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 11,220.78 9 5/8" 9.625 12.250 2,815.78 13 3/8" 13.375 17.500 13,151.00 PRODUCTION LINER 1 2.375 3.250 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 11,400.00 8,579.16 4,090.69 5,397.11 H-28APB1 TIP 11,409.50 8,585.21 4,094.63 5,403.28 H-28ABP1 KOP 11,425.09 8,595.48 4,101.15 5,413.02 Interpolated Azimuth 11,450.43 8,613.34 4,112.19 5,427.20 Interpolated Azimuth 11,480.17 8,635.79 4,125.80 5,441.13 Interpolated Azimuth 11,510.12 8,659.63 4,140.14 5,452.19 Interpolated Azimuth 11,950.25 8,990.63 4,374.78 5,342.33 H-28ATIP 13,150.00 9,018.63 5,016.98 5,872.50 Projection to TD Checked By: Approved By: Date: 9/11/2014 12:45:59PM Page 4 COMPASS 5000.1 Build 61 As N 00 O L N p c) E./ O a) C N 0) N d W C v) m . ✓ O N CC 2 ❑ a a oN W W o o ff ✓ 0 W ? U rn . a 2 0 Q a) O O L O U U o O (a In m ('7 H Z H O p0 o W C' N CO ❑ W U 0 U U _ N X X O)N c . ..��. ,o- NU> w U oN 0 o 0 o o CL N o Lv 0 0 0 0 0 oa 0. o .0 0, 0,oU p T H I N a• O) y N CD O 0 co , 0 0 N 0 Nm Y N U) cya a m a) E 2 2 2 O �r n o >' :' m N O CoE r-- h a) N 2 N _ N' s' ,- ? C x C U O.P. I` HCJ c, ❑ 2 ❑ W oa) 8 o)N ❑,Z a a) o (n O -0'W C E ❑ H 0 �' 0 m g > d cci o a N N O W W L O O -o c N W' co W — E c)f0 N a) J o O N a) `. a) - E o U c O .0▪ a W U U E J O ).- a) FNr r H N V O N p ate-.,- co > r co N23 O O N J E d a N E c y N CO N m N ao .n > U W co °� g q Z ui T, v U) • W a) 2 p C 0- N• > O c) c Q re A N d C w v °' Z o E) ‘c7, • E Q r-- E o p a) x x > > a) y U " 0O rn N ❑ v> W W (75W F 0 a ��\\ E co E E Q o.= a) d O — Q 0 W ca 0 co a) ❑ O w O Q N 2 '5 < -0 N d -Lc V N i a) z Z Cr' a O U m V Y Li Z v Ce Y 1 co E, U CO m —• a O N Z a a p U W .. O O N g S] N M I a' O ' N n 0 0. co V) O C E LL S a) N -' a) 0) 0 c0 cc; — N °� Im m E '-0 E c W ❑ al N 0 LL r Z > 0 (/) !CA.) LU 0 U U W W' Q O N C O N a) co EE as T 'a o re Eco • .6 c ~ H H 2 c� Z w LL N ���oo CD c a < U c/) O U 2 5 H) C7 < Z U u) o ¢O ~ O O Z d cop WW ° �I'. Q > LI- V 12 LL W W, Z o v W J H A O O Z Y 0 Z W U N o O 2 Y of Z m H J COw .0 a) Q p LL 2 O CO 0 UH) C.) Et Zli.J w CT M. ao U O N = J u) W ....., H U W N- N Y a) o _ u) U 2. c @ z N Y d p O ai TZ a) W U) W Z E ELL N E m 0 U o E , a) W H rn O L 0 co co c O_ - C H U) U O Z NE ` a) a) 0) Qj LO o 2 a) " N O E E_ c a) '0 E U a) O C W >�. o U -C' > H O E 0. O O N cn (D N E 5 H N ' 0. c c O C1 ` Z H>' N > T p 0 Y v _c oal�d - a) a) ) - 0_ O u) H r` LO p r CO ° > o a E E a m ° ? a o Y a) a u v m o .,O o t a` CD Q 0 O N > > a) N L O O O CD 0 H 0 W w 0 ' U 0 a IX IX u. L a >- co 0 2 0 0 ❑ ❑ o 0 Of • I 0 N 85 U_ ci o O I 7 3 m E o N c L 0 n a) r +- N E Q O) Q co co (n- a _ co .... N U o To J n M o U E to N 1O U 2 Y1 ✓ M co jm O O N U O 1 £ (A co co a1 7 - Z Z a U 0 a) o I.D. m d U L n i U a N> a o co CO F H m 0 m r' N FT z n a z 0 U m n t v 0 z Q r c w O r p J El coo a) n LL C) e m . • a ^ 'o m E c a) co z N a = o) o E -'- z z c_ � v o > ;� o'm ct v n a v co N J d } j 'O O Z VJ N n CO u. = a N c n a V G 8-1 {O a W al C m ym " 22 m NWaa mEa 0. O.. N m ?' o w cC ' m y a �Upp a C rn 20 w !n E O .. Y c p .s y w d r a m n aa) a) ° U v o a m J a E L •N H ~ o c w COco o op 0 r.. ja d .. d C a+ N E rn £ o £ n E .° m a) E o a 0 a z H U O U m a) U N a) @ oa £ ' o c U m m 7 2 C N 7 U N Q cy co co m ° E 3 p c E t N a) O O O 0 O r 0 U = o m u) U 2 I- -, = Ct2 O 9 m m H d O Z Y Z; 0 O m o m Z O m p F o N ` N a m 2 E O 2 o_ _7 ' 2 Ul d is 7 a N (n H a co a r z > (n n o 0 0 (n fn a Q o a O) N a"M "' ^ N 3 _ 6 C (n J o N E Oo D N p o o O Q cl N H 2 m co N O- X a' .0 0 .. N CLO- J co - F O Q o w v M LL 120 2 w -o o c o O a) (V n o) n E H x o > NIX a I a) r Q O a z N a O MI w `n Q V ' a) ^ (h C o E nS4 E a m Z > a v La o m .o. v m 0 U > z z z (3 v to iw Q a) m m a) >, H H o E o Z co O J H z 01 L 7 V ow a) a) J a) 0 U o V) 0 D cu E co atZ o d O 'alpaa co Q co Q J Op ‘- Or ZN Q O L. ' c a To aO H ) cN ac > N E ` zw Nc ppa aCC n a aE D 'ic w E cowoyc.) a w ci 0 H H 0 m LC) co U 7 m U m H 2 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Sunday, October 05, 2014 6:17 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M IL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr;AK, OPS Well Pad HUQ; Bailey, Denise G; Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Regg, James B (DOA) Subject: OPERABLE: H-28A (PTD #2140040) MIT-IA Passed Attachments: image001.png; Producer H-28A (PTD #2140040) TIO Plot.docx; Producer H-28A (PTD # 2140040)Wellbore Schematic.pdf All, Producer H-28A (PTD#2140040) was recently sidetracked, and passed an MIT-IA on 07/06/2014. The passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. • Well status is Operable • A SSSV is not required • Annuli are fluid packed Please use caution while placing well on production due to fluid packed annuli and the potential for annular fluid expansion. Copies of the TIO plot and wellbore schematic are attached for reference. Thank you, Jack Disbrow BP Alaska -Well Integrity Coordinator GVVGlobal Wells Organization Office: 907.659.5102 WIC Email:AKDCWeIllntegrityCoordinator@bp.com 1 • Producer H-28A(PTD#2140040)TIO Plot WeH:H-29 4.000 3.000 - Tbg —E—IA 2.000 —di,—OA 00A --000A On 1,000 07/05/14 07/1214 07/19/14 07125/14 0810214 00)0914 081614 0823114 0813014 0996)14 09:13/14 0912014 0927/14 1004/14 TREEF - 6-3/8"CE H 2 8 A {VYELLHFAD= MCEVo � Y SAFci f NOTES:WELL ANGLE>70°@ 12000""MAX ACTUATOR= AXELSON DOGLEG:30.5°@ 12921'" OKB.ELEV= 75.6' I [11 T _ll P,D l =4.562" BF.ELEV= 46.2' _•co ucTOR, H -110 / O 211— - �5-1/2"OTIS SSSV LAND N 62" J KOP= 1500' _# -- 2498' 1--15-1/2"X 4=1/2"XO,D=3.958' Max Angle= 94°@ 12801' D= Datum M3= 11768' GAS LFT MANDRELS Datum TV D= 8800'SS ST MD TVD DEV TYPE VLV LATCH FORT DATE 5-1/2"TBG,17#,L-80,.0232 bpf, =4.892" 2498' 7 3493 3199 45 ME2LA DOME RM " D 16 09/24/14 1� 6 4624 4002 44 FIER.A DMY RM ' 0 02/26/95 13-3/8°CSG,68#,L-80 BUTT,D=12.415" -I 2818' ' 5 6978 5589 52 M ERLA SO RM ' 20 09/24/14 4 8697 6708 46 NB�LA DMN RA i 0 05!21/88 Minimum ID = 1.78' Q@ 10729' 39787751943NERLA 'DMYRM 0 10/28/13 WIPER PLUG BUSHING 2 10564 004675701308 043 51 PMA '•DMY RA 000 05/2vaa 1 10753 8162 51 MBNA ""DMY RM ' 0 10/08/92 IN 2.7" DEPLOY SLEEVE *STA#3=DMY HAS EXTENDED PACKNG "'STA'S#2(BENE LATCH)&#1= CBvQJTED(06/30/14) ES-MATED TOC(06/30/14) -I 10527' �•. ;+y. 10701' -,3.70"DEPLOY SLV,ID=3.00" TOP OF 3-1/2 X 2-7/8"X 2-3/8"LNR - 1 10701' 10706' --f 3-1/2'X 2-7/8"XO,0=2.370" g NW ++.N C 10708' H2-7/8" D Igt 1?"*.', 10718' --12-7/8*LNR XO,D=2.250" Ike ig$N 10719' 2.70"DEPLOY SLV,D=2.250" (* dd6 1 WIPER PLUG BUSHING @ 10729',ID=1.78" .4-.., Iskg !' 10748' Hi-1/2^wait PATCH,D=3.25"(11/22/93) 1 1i v.5 �Q `►`►. i N 10766' -4-1/2"ME LA PATCH,D=3.25'(01/18/93) '4i11 INP1A 10831' -14-112"BKR L SLD SLV,D=3.812" B@iND t,;*. ' 8 4.A.' 8 1.1t8 10890' HTNV TBG SEAL ASSY CT LNR ►.t 8►�" 10906' -9-5/8"x 4-1/2"TIW HBBP PKR,D=3.958" 1 TOP OF 7'LNR -1 10958' 1 y`► 1094T -14-1/2'o-ns X NP,ID=3-813" I 18 ; //7 cS‘., THE STATE . 333 Vve l Seventh Avenue GOVERNOR SEAN i',\RN1:1 1. Anchorage, Alaska 99501-3572 A 11,'•1,A John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU H-28A BP Exploration (Alaska), Inc. Permit No: 214-004 Surface Location: 1243' FNL, 1265' FEL, SEC. 21, T11N, R13E, UM Bottomhole Location: 4000' FSL, 4999' FWL, SEC. 15, Ti 1N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, i-326/ c/1/. Cathy P. oerster 'l- Chair DATED this f d y of February, 2014. STATE OF ALASKA c ' *' ...--„ i It r 4-;.w i ,.. e ALAS._ .OIL AND GAS CONSERVATION COMMI�_,ON �, ., PERMIT TO DRILL `'' 17 -`;:'lY 20 AAC 25.005 1 a.Type of work: 1 b.Proposed Well Class. IN Development Oil 0 Service-Winj ®Single Zone. 1 c.Specify if II's rQ ❑Drill • 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone ❑Coalbed Gas 0 Gas Hydrates ®Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5.Bond ®Blanket 0 Single Well 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193 ' PBU H-28A 3 Address 6.Proposed Depth. 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 13623' . ND 8954'ss • Prudhoe Bay/Prudhoe Bay• 4a.Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: . ADL 028284 • 1243'FNL, 1265'FEL, Sec.21,T11N, R13E, UM Top of Productive Horizon: 8.Land Use Permit. 13.Approximate Spud Date: 2845'FSL,4140'FWL, Sec. 15,T11N, R13E, UM August 15,2014 Total Depth 9 Acres in Property: 14.Distance to Nearest Property: 4000'FSL,4999'FWL, Sec. 15,T11N, R13E, UM 2560 19500' 4b. Location of Well(State Base Plane Coordinates-NAD 27)• 10.KB Elevation above MSL• 75.60' • feet 15.Distance to Nearest Well Open Surface: x 643323 ' y-5959546' Zone- ASP4 GL Elevation above MSL. 44.88' . feet to Same Pool: 650' 16 Deviated Wells: Kickoff Depth: 11410' feet . 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 99 degrees Downhole: 3290 - Surface: 2410 ' 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 3" 2-3/8" 4.6# L-80 TH511 2923' 10700' 8053'ss 13623' 8954'ss 65 sx Class'G' • 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft). Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) 12327' 9128' 11670 tTOcl,11686' „��� .,,,,,, , 12283' 9103' 12227' Casing Length Size Cement Volume MD ND Conductor/Structural 110' 20" 8 cu yds Concrete 110' 110' Surface 2818' 13-3/8" 4013 cu ft Arctic Set II&I 2818' 2688' Intermediate 11221' 9-5/8" 2709 cu ft Class'G' 11221' 8464' Production Liner 1367' 7" 368 cu ft Class'G' 10958'- 12325' 8292'-9127' Perforation Depth MD(ft): 11870'-12140' Perforation Depth ND(ft): 8866'-9024' 20.Attachments: 0 Property Plat 0 BOP Sketch 0 Drilling Program ❑Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch ❑Seabed Report 0 Drilling Fluid Program 0 20 AAC 25 050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Ron Phillips,564-5913 Printed Name John l c .11,e/Aor Title Engineering Team Leader Email Ron.Phillips@bp.com Signature OF' Phone 564-4711 Date I 16/,y Commission Use Only Permit To Dril / API Number: Permit App I Dat See cover letter for Number: //Y - 50-029-21806-01-00 ' other requirements. Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce co lbed methane,gas hydrates,or gas d Et‘ contained shales: Other. a o p f-c 5 f fL2 ,3 50(2 p 5 t Samples Req'd• OyesQ"No Mud Log Req'd: ❑�'es 9No H25 Measures: 'Yes 0 No Directional Survey Req.& iff Yes ❑No Spacing exception req'd: 0 Yes 13/No inclination-only svy Req'd: 0 Yes ErNo APPROVED BY /9 • .el-if v• _ • _ THE COAPPROVED BY .2MMISSION Date -Tq-i `1'l ilt Form 10-401 Revised 10/frzr201 his pe A fim the date of ap royal 20 AAC 25.005(g)) Submit F nn and Attachments In Duplicate ^p)' i al . . •• '; To: Alaska Oil &Gas Conservation Commission From: Ron Phillips 0bp CTD Engineer Date: January 14th, 2014 Re: H-28A Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well H-28 with the SLB/Nordic 2 Coiled Tubing • Drilling rig, targeting Ivishak Zone 2A/1 B. • Rig Work(scheduled to begin August 15th, 2014) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. 2. Mill a cement pilot hole 200 ROHS to 11,460'. 3. PDS Caliper log the cement pilot hole. 4. Seta 3-1/2" monobore whipstock low side (180 ROHS) at 11,410'. 5. Mill 2.80"window at 11,410' and 10' of rathole. • 6. Drill lateral: 3.0" OH, 2,213' (18 deg DLS planned). 7. Run 2-3/8" liner leaving TOL at 10,700' MD. PT 8. Pump primary cement job: 13.5 bbls, 15.8 ppg, TOC @ TOL. * 9. Perform liner cleanout run. 10. MCNL/GR/CCL logging run. 11. Test liner lap to 2,400 psi. 12. Perforate liner based on log interpretation (-800'). • 13. Freeze protect well to 2,500' MD. 14. Set BPV; RDMO. *Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. Re-install well house, flow line and pull BPV. 2. Set GLV's 3. Set liner top packer with slickline as needed if liner lap pressure test fails.* *Approved alternate plug placement if liner lap test fails per 20 AAC 25.112(i) Mud Program: • Milling/drilling: 8.6 ppg PowerVis for milling window and drilling (645 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. - • Fluids with PH >11 must go to GNI. Hole Size: • 3" from 11,410' MD to 13,623'. Liner Program: • 2-3/8", 4.6 lb/ft, L-80, TH511 Solid liner 10,700' MD— 13,623' MD. • A minimum of 13.5 bbls of 15.8 ppg cement will be used for liner cementing (TOC 10,700' MD). • The primary barrier for this operation: a minimum EMW of 8.6 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars run in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams, and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 99°, inclination at kick off point is 50°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - • Distance to nearest property— 19,500'. • • Distance to nearest well within pool 650'. Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. - • Cased hole MCNL/GR/CCL logs will be run. • Perforating: • 2.0", 6 spf, PJ HMX perf guns, 1-1/4" CSH & 2-1/16" CSH work string • The primary barrier for this operation: a minimum EMW of 8.6 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • H-19A, APB1 & APB2 CTC: 1 ,172' P&A for sidetrack • Q-05 & A CTC: 693 P&A for sidetrack • Q-07, A, APB1 & APB2 CTC: 961' P&A for sidetrack • Q-07B CTC: 559' Will be Shut in (LOTO) - Hazards ✓ • H pad is an H2S pad with well H-22A reading 150ppm on 1/1/2013. • The lost circulation risk in the H-28A is considered to be medium. Reservoir Pressure • The reservoir pressure on H-28A is expected to be 3,290 psi at 8,800' TVDSS. (7.19 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,410 psi. - • An EMW of 8.6 ppg for this well will provide 645 psi over-balance to the reservoir. Ron Phillips CC: Well File CTD Engineer Joe Lastufka 907-564-5913 BAKER HUGHES LNTEQ North America - ALASKA - BP Prudhoe Bay PB H Pad H-28 -Slot 28 H-28A Plan: Plan 6 BP Coil Tubing Report 28 October,2013 Qbp Mill BP BAKER HUGHES BP Coil Tubing Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28-Slot 28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB H Pad MD Reference: 38:28 3/19/1998 15:16©75.60usft(Nabors 2ES) • Well: H-28 North Reference: True Wellbore: H-28A Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM R5K-Alaska PROD-ANCPI Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) • System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 • Using geodetic scale factor Site PB H Pad,TR-11-13 —_i Site Position: Northing: 5,957,572.25 usft Latitude: 70°17'30.055 N From: Map Easting: 641,366.07 usft Longitude: 148°51'19.80 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.08° Well H-28-Slot 28,H-28 Well Position +WS 0.00 usft Northing: 5,959,545.30 usft . Latitude: 70°17'49.093 N +FJ-W 0.00 usft Easting: 643,323.00 usft . Longitude: 148°50'21.68 W Position Uncertainty 0.00uft Wellhead Elevation: usft Ground Level: 44.8 usft . Wellbore H-28A I Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1 l°1 (nn BGGM2013 1/1/2014 19.94 80.98 57,631 Design Plan 6 Audit Notes: Version: Phase: PLAN Tie On Depth: 11 400.22 Vertical Section: ,'441..,:' Depth From(TVD) +N/-S +E/W Direction _ (usft) (usft) (usft) (°) -43.00 0.00 0.00 40 00 10282013 4.04.27PM Page 2 COMPASS 5000.1 Build 61 Vaal BP BAKER HUGHES BP Coil Tubing Report 0 bp 1N'1'LQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28-Slot 28 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB H Pad MD Reference: 38:28 3/19/1998 15:16 02)75.60usft(Nabors 2ES) Well: H-28 North Reference: True Wellbore: H-28A Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM R5K-Alaska PROD-ANCP1 Survey Tool Program Date 10/28/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.22 11,400.22 1:Speny-Sun BOSS gyro multi(H-28) BOSS-GYRO Sperry-Sun BOSS gyro multishot 11,400.22 11,560.00 Plan 6(H-28A) INC+TREND Inclinometer+known azi trend 11,560.00 13,623.00 Plan 6(H-28A) MWD MWD-Standard Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V.Sec TFace (usft) (`) (°) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) (1 11,400.22 50.37 57.39 8,503.78 4,09069 5,397.11 5,963,737.85 648,640.71 0.33 6,602.85 12.17 TIP 11,410.00 50.47 57.40 8,510.01 4,094.75 5,403.46 5,963,742.03 648,646.98 1.03 6,610.04 4.41 KOP 11430.00 48.78 56.58 8,522.96 4,103.05 5,416.24 5,963,750.57 648,659.60 9.00 6,624.61 -160.00 End of 9 Deg/100'DLS 11,480.00 40.48 51.89 8,558.52 4,123.46 5,444.76 5,963,771.52 648,687.72 17.85 8,858.58 -160.00 4 11,500.00 38.42 47.31 8,573.97 4,131.69 5,454.44 5,963,779.93 648,697.24 17.85 6,671.10 -127.03 11,600.00 31.69 18.19 8,656.36 4,178.09 5,485.73 5,963,826.91 648,727.64 17.85 6,726.76 -123.49 11,700.00 33.24 344.71 8,741.41 4,229.90 5,486.71 5,963,878.73 648,727.63 17.85 6,767.08 -99.45 11,800.00 42.16 319.14 8,820.93 4,282.15 5,457.29 5,963,930.40 648,697.22 17.85 6,788.19 -70.97 11,861.07 49.66 308.09 8,863.46 4,312.09 5,425.47 5,963,959.73 648,664.84 17.85 6,790.68 -50.55 e 11,863.77 49.66 308.09 8,865.21 4,313.36 5,423.85 5,963,960.97 648,663.19 0.00 8,790.61 0.00 e 11,900.00 53.92 314.29 8,887.63 4,332.13 5,402.48 5,963,979.32 648,641.47 17.85 6,791.25 50.80 12,000.00 66.96 328.38 8,937,04 4,400.08 5,349.00 5,964,046.23 648,588.71 17,85 6,808.92 46.96 12,100.00 81.01 339.87 8,964.85 4,486.33 5,307.55 5,964,131.67 648,543.62 17.85 6,848.35 39.93 12,200.00 95.39 350.48 8,967.80 4,582.57 5,282.12 5,964,227.40 648,516.37 17.85 6,905.73 36.73 12,207.76 96.50 351.31 8,967.00 4,590.19 5,280.90 5,964,235.00 648,515.00 17.85 6,910.78 36.39 7 10282013 4:04:27PM Page 3 COMPASS 5000.1 Build 61 Mil BP RAKER HUGHES BP Coil Tubing Report 0 bp LNTEQ Company: North Amenca-ALASKA-BP Local Co-ordinate Reference: Well H-28-Slot 28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB H Pad MD Reference: 38:28 3/19/1998 15:16(§75.60usft(Nabors 2ES) Well: H-28 North Reference: True Wellbore: H-28A Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM R5K-Alaska PROD-ANCP1 Planned Survey MD Inc Azi TVDSS N/S ENV Northing Easting DLeg V.Sec TFace (usft) (1 (1 (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) (°) 12,287.76 99.25 546 8,955.99 4,669.19 5,278.64 5,964,313.93 648,511.23 17.85 6,969.85 78.00 8 12,300.00 97.06 5.46 8,954.25 4,681.25 5,279.79 5,964,326.01 648,512.16 17.85 6,979.83 180.00 12,339.55 90.00 5.46 8,951.82 4,720.52 5,283.54 5,964,365.35 648,515.18 17.85 7,012.33 -180.00 9 , 12,400.00 90.00 16.25 8,951.82 4,779.80 5,294.91 5,964,424.83 648,525.39 17.85 7,065.04 90.00 12,489.55 90.00 32.23 8,951.82 4,861.19 5,331.56 5,964,506.90 648,560.48 17.85 7,150.95 90.00 10 12,500.00 90.00 30.37 8,951.82 4,870.12 5,336.99 5,964,515.92 648,565.74 17.85 7,161.27 -90.00 12,544.55 90.00 22.42 8,951.82 4,909.99 5,356.78 5,964,556.17 648,584.76 17.85 7,204.54 -90.00 11 12,600.00 90.00 32.31 8,951.82 4,959.17 5,382.23 5,964,605.82 648,609.27 17.85 7,258.58 90.00 12,700.00 90.00 50.16 8,951.82 5,034.07 5,447.88 5,964,681 95 648,673.48 17.85 7,358.15 90.00 12,734.55 90.00 56.33 8,951.82 5,054.73 5,475.56 5,964,703.14 648,700.75 17.85 7,391.77 90.00 12 12,800.00 89.95 68.01 8,951.85 5,085.23 5,533.33 5,964,734 73 648,757.93 17.85 7,452.27 90.25 12,900.00 89.88 85.86 8,952.00 5,107.74 5,630.35 5,964,759 08 648,854.50 17.85 7,531.88 90.24 13,000.00 89.82 103.71 8,952.27 5,099.42 5,729.60 5,964,752 66 648,953.88 17.85 7,589.30 90.22 13,077.55 89.78 117.56 8,952.55 5,072.16 5,802.00 5,964,726.78 649,026.78 17.85 7,614.96 90.17 13 13,100.00 89.78 113.55 8,952.63 5,062.48 5,822.25 5,964,717.49 649,047.21 17.85 7,620.55 -90.00, 13,200.00 89.80 95.70 8,953.00 5,037.33 5,918.62 5,964,694.19 649,144.03 17.85 7,663.23 -89.98 13,300.00 89.83 77.85 8,953.33 5,042.93 6,018.06 5,964,701.68 649,243.34 17.85 7,731.44 -89.92 13,400.00 89.88 60.00 8,953.58 5,078.75 6,110.99 5,964,739.26 649,335.56 17.85 7,818.61 -89.86. 13,500.00 89.94 42.15 8,953.73 5,141.32 6,188.47 5,964,803.30 649,411.83 17.85 7,916.35 -89.82 13,600.00 90.01 24.30 8,953.77 5,224.64 6,243.05 5,964,887.63 649,464.80 17.85 8,015.26 -89.79 13,623.00 90.03 20.20 8,953.76 5,245.92 6,251.75 5,964,909.07 649,473.10 17.85 8,037.16 -89.78'i. • TD at 13623.00-2 7/8" 10/282013 4:04.27PM Page 4 COMPASS 5000.1 Build 61 nR■ BP sfili9BP Coil Tubing Report t + bp 1N'TEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28-Slot 28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB H Pad MD Reference: 38:28 3/19/1998 15:16 @ 75 60usft(Nabors 2ES) Well: H-28 North Reference: True Wellbore: H-28A Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM R5K-Alaska PROD-ANCPI Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (In) 2,816.00 2,610.62 13 3/8" 13.375 17.500 11,221.00 8,388.45 95/8" 9.625 12.250 13,623.00 8,953.76 2 7/8" 2.875 4.125 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E1-W (usft) (usft) (usft) (usft) Comment 11,400.22 8,503.78 4,090.69 5,397.11 TIP 11,410.00 8,510.01 4,094.75 5,403.46 KOP 11,430.00 8,522.96 4,103.05 5,416.24 End of 9 Deg/100'DLS 11,480.00 8,558.52 4,123.46 5,444.76 4 11,861.07 8,863.46 4,312.09 5,425.47 5 11,863.77 8,865.21 4,313.38 5,423.85 6 I 12,207.76 8,967.00 4,590.19 5,280.90 7 12,287.76 8,955.99 4,669.19 5,278.64 8 12,339.55 8,951.82 4,720.52 5,283.54 9 12,489.55 8,951.82 4,861.19 5,331.56 10 12,544.55 8,951.82 4,909.99 5,356.78 11 12,734.55 8,951.82 5,054.73 5,475.56 12 13,077.55 8,952.55 5,072.16 5,802.00 13 13,623.00 8,953.76 5,245.92 6,251.75 TD at 13623.00 Checked By: Approved By: Date: 10/28/2013 4•0427PM Page 5 COMPASS 5000.1 Build 61 • Protea:Prudhoe Bay AeWong.,,aa WELLBORE DETAILS:H-288 Ri e�2O6 M.■ Sae:PR N Ped Aa.,m s,arvF.0 H-20A 000040W04E1Raawo Well HIB-9x28,T00l609 sw�� Wet H-b P sve�pn; wemfiwl Reference Akan See lea $ Wdlbo N-28A nom Sworn\Olnaaenm.Su-MO.00N OWE) 0 bpO,a� Parent Wellbore'.H-28 Meowed Oath Nkoo.38283n9'199815184875.00UA(N0ae 2ES) Ran:Plan BIN-281N•29At O norma - Te on MD:11400.22 Cekuamn Net.Mira.Curvature --... 1NTEQ 5500. • .. . WELL DETAILS:1428 5400 - - - - erondLeal MA H-28ATerget5 .IL-3 +El-W Nor0n8 Eaeng laaatle Longitude RIM 0.00 0.00 31758515]0 613;4300 10'1T49.993N 148'5021.68W 28 5300-- H-28ATv8e17 H.28A Tager - H-281{- A 217. SEC118NDETAILS AN40TATIONS 5200- - - - a Sac MD Inc Ani enTVD .WS .0789 Dleg TFace VSecl Target MD Annala8on 5100 - - 1140022 5037 57.39 8503.78 4090.49 5397.11 000 000 660285 11400.22 TIP 1161000 50.47 57.40 851001 409475 540344 103 4.41 6610.04 11410.00 KOP ,..•5000 • - 1143000 48.78 56.58 852296 4103.05 5416.24 9.00 200.00 6824 61 11430.00 E51449De9/100DLS .S 11480.00 4046 51.89 8558.52 4123.48 5414.78 17.85 20000 8858.58 1148000 4 11861.07 49.68 30809 886346 431209 542567 17.85 -12703 6790.68 11861.07 5 I 4900 --_.----- - H-28ATvge12 11863.77 4986 30809 886521 431336 542385 0.00 000 679061 11863.77 6 G 12207.76 9850 35131 896700 4590.19 5280.90 17.85 50.80 6910.78 4-280Target 1 12207.76 7 84900 _--}. 12287.76 99.25 5.48 8955.99 4889.19 527864 17.85 7800 696985 12287.76 8 5 0 12339.55 9000 46 895182 47252 5283.54 17.85 18000 701233 12339.55 9 ..r 1 12489.55 90.00 3223 895182 486119 5331.58 17.85 90.00 7150.95 12489.55 10 +4700 -- * - - -- --- ---- 1 12544.55 9000 22.42 895182 490999 5358.78 17.85 27000 7204.54 12544.55 II 1 12134,55 9000 56.33 8951.82 505473 547558 17.85 90.00 7391.77 12734.55 12 04600- 1 4600 1 13077.55 89.78 11756 895255 5071.16 580200 17.85 90.15 701496 13077.55 13 H-28A Target 1 1361300 9003 2019 8953.76 5145.91 8151.75 17.85 270.00 8037.16 1362300 1Dtl13823.00 500 aS - - - 11.2811-28 - - 0 4400 ! 11*111 �•\ l. I 1300 _.- _ __ H-28A Polygon 10-18-13 1200- - 4100 --. 4700 4800 4900 5000 5100 5200 5300 5400 5500 5600 5700 5800 5900 6000 6100 6200 6300 6400 6500 West(-)/East(+)(100 usft/1n) 11 8500 , __. f.- , 1 1 ---I' 8550 Toe ' I '.- •1 '- . ' 1 1 -1 1 -- - _ 1 i r T a9600- - - -__.. _.. _. _.---' r + -. i- r -__ 7 16504• g-odor9 Deg//10010LS. 1n ..-. 8700 . _ -.__- _-...._... .. t 1. , 8750 --r-_.. - .. _ _ _ -__ r_. __ -- 'a 8800 f i- 0 - rt- .- o +In � _ : • 8850 _ ,. I - ' 1 }a• 8900 t 11-28A Target H-26A Terget7 H-26A target F{-28AGrgo15 ✓ I~ 8950 _.___H- _ t-- -- -` 8 9 10 12 II 9000 _ - 7 - I1-2811-28A • I. - Men Sec fowl H-28A Target 1 J. _ ____-_.. __ 11.2811.28_ .__ _-._. -. 9030 --- - -f-.rt�- 6400 6450 6500 6550 6600 6650 6700 6750 6100 6850 6900 6950 7000 7050 7100 7150 7200 7250 7300 7350 7400 7450 7500 7550 7600 7650 7700 7750 71700 7850 7900 7950 8000 8050 8100 8150 9200 8250 8300 8350 Vertical Section at 40.00°(50 usft/in) Project'Prudhoe Day ----- ^' iy.atrolnl6e6 WELLBORE DETAILS:H-28A 16684EBfO8M7Ia ilia Site:P9 H Pad d 114.t H- Ga..(HE)PJaerm Well 1.1-28.51o128,l6 75 gL���` Wel:H-28 / 4een/r SM., Wtio1(MI)Wereice 38 28213'19961516@ 75 Mut A�YTYilfi 0 l� Wellbore:H-28A :t2.4644 Parent Wellbore:H-20 Soma Rale-once 38 26Soma)ryS)Ralarenoa Sol 8(04'193OON 00CEi6®]Sfi0u91(Ndoe26) b Plan PIan61H-28N-28A) O exwmlr Tie on MD 17400.22 Calculation Wroa 28 G00 uvTE(► `G 57755850 .__ ��__.. 1111■ _- 1111■ I --__ . - .-.—_,_ — 5700 l_1..ill_n•- 11 ■ 1111■■ 11■■ ■ 3623 - 3330 - -- -1-1■■ 3173 1111■■__ t .. - --- ■._. lv' lv A -_.. ■■1111■ ■■ ■ I i -- 6400- -- ■ -- 5335-- 1111■ ■■■■■■■■ Q 0 N i 11111111 M-_ ■■■11111111111111 H-28/H-28A a .. 8 I/Q-07APB I 5350-- 'II■■■ :1111■. --- y��9 •' 3177 . ._- ... ........ ..... ... . . . ... .... .. . .Al 5100— 1 -- 3023 ■��NI%■■■■ �- / --. -ow o + If 7 .6: ..1873--... 11111 - I `-_� __.__..-_._ �I ■■,1■■ 3 3 v t4800 -- -- O 6723- - - •Q-0/Q-07 ' 4650 - - - 0 1575'— 1111■■■■ H-28H-26 1300 1111■■■■ -_ j 1133 11111 1111111111111 _ _. � I 1370 -- — 1n, 111111 1200 _ 8800 ,d. -) 4123 - -$ 4050 ■■■■■■■■■ -i — —. _. } -.-- — - °A 111111■■■■■� 1111 \\''4/14" 39,5 1111■■■■■I/ 1111 7900 Q-0/Q.0"13 13/19/1908151ya'5 1d1 Nabors•:11 ■■ - .'1111 ■ ■ _- ■ --_.-. 1425 4500 4575 4650 4725 4800 4875 4950 5025 5100 5175 5230 5325 5100 5175 3350 5625 5700 5773 5150 5925 6000 6073 6150 6225 6300 6373 6450 6525 6600 6675 6750 6125 6900 6975 7050 7123 West(-iEast(+)(75 us8/m) Project:PBay ANTI-COLLISION SETTIN,35 _ ^•-ALASKA-8P ��il b Site:PEI H H Pa Pad Interpolation Method MD interval sDo6 BAKER 0P WNI H-28 Depot Range From 11400.22 To 13623.00 KIR Results Landed Si:Cent.Distance:155901HtJti1ES Wellbore:H-26A Reference:Ran.Ran 6(H.28111.286) _ - Plan:Ran 6(H.28M.28A) a....7060 nett eu" 1NTEQ WElL13ETAAE:Na • Grand Luval: 44.8 +608 4El4W N.H/na Susan' LIOlbbid. de Lang.. Slot Draft- No Tolerance Lines Drawn 960 BOG 69606" 6433800 70.17 4149113t4 143.6021.66W 28 SEC110N DETAILS Fenn Colour TO NO 680. MD Inc 6 P.4) 05/4.5 4.814Wm E.-W Oleo TFeVS8 'rave 11400.22 50.37 5139+ 5579.38 40%.69 5397.11 0.00 0.00 6602.855 11410.00 50.47 57.40 8585.61 4094.75 5403.46 1.03 4.41 6610.04 11430.00 46.78 5698 8598.56 4103.05 5416.24 9.00 200.00 6624.51 350 0 10_ 11480.00 40.48 51.89 8634.12 4123.16 5444.76 17.85 200.00 6658.58 11661.07 49.66 308.09 8939.06 4312.09 5425.47 17,85 -127.03 6790.68 340239 11663.77 49.66 3%.09 8940.81 431336 5423.85 0.00 0.00 6790.61 12207.75 96,50 351.31 9042.50 4590.19 5280.% 17.85 i0: 8 %685000 ]0125 8000 71505 90% 22.42 %2],42 190999 5356.78 1]85 72045 9000 58.13 %2]12 505413 54]5.% 1].85 7391D 1 1]07]55 BB]8 11]56 %2815 50]216 5803 00 1785 7fi14003 20.19 %29.36 5245.92 6251.75 1].85 8037.16 70 \ 310 � 50 150 �- �\.. 300 //'%/�' /�%-. 139 60 ._ SURVEY PROGRAM- .. 110 SURVEYOate:2013.10.2610000;00 Ve84ate4.Yes Version Depth From Depth To Survey/Ran Taal 90 \ 1002 .9Sd3�(6 2 1140022 1-Sporty-Sun EC. 290 \ 70 11400.22 11560.00 Pbn 6(14-28A) INC+TREND 11560.00 13623.00 Plan 6(41428A) MWD 70 H-2131H-28 280 50 - -. 0 0 . itl o ca 270 -..f. � °'I o 90 1.606410 2GD <o ;4fiii ,� / ,,,/ w BO 250, - - 110 e,V,4.1443.14-441.44444 li 00 4 1144414.4(.4m 240 120 //� iy��� 120 110 -: / � , 4.1•41,Ol0005•11 o.0 1-20.001 �..>,+.a,...e.... 230160 30 w 160 w 220 - _.._� X40 .,i.,s.e.a.ssa ss».r�.s.erew.om.ne.....,omue:h 210 2W -• /// oomVs 220 _� � .11-10»uw•,wnwto ow.e 200 190 ._:440 --4-i0---:- 180 Azimuth torn North flvs Centre to Centre Separation[20usft/in] BAKER HUGHES LNTEQ North America - ALASKA - BP Prudhoe Bay PB H Pad H-28 H-28A Plan 6 Travelling Cylinder Report 28 October, 2013 0 bp Rill BP BAKER HUM S Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28-Slot 28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB H Pad MD Reference: 38:28 3/19/1998 15:16 @ 75.60usft(Nabors 2ES) Site Error: 0.00 usft North Reference: True Reference Well: H-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore H-28A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Reference Plan 6 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,400.22 to 13,623.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,559.04 usft Error Surface: Elliptical Conic Survey Tool Program Date 10/28/2013 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.22 11,400.22 1 :Sperry-Sun BOSS gyro multi(H-28) BOSS-GYRO Sperry-Sun BOSS gyro multishot 11,400.22 11,560.00 Plan 6(H-28A) INC+TREND Inclinometer+known azi trend 11,560.00 13,623.00 Plan 6(H-28A) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,816.00 2,610.62 13 3/8" 13.375 17.500 11,221.00 8,388.45 9 5/8" 9.625 12.250 13,623.00 8,953.76 2 7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB H Pad H-04-H-04A-H-04A 12,175 00 13,375.00 1.209 23 631.24 604.92 Pass-Major Risk H-05-H-05-H-05 Out of range H-05-H-05A-H-05A Out of range H-05-H-05B-H-05B Out of range H-14-H-14-H-14 Out of range H-14-H-14A-H-14A Out of range H-14-H-14APB1-H-14APB1 Out of range H-14-H-14APB4-H-14APB4 Out of range H-15-H-15-H-15 Out of range H-15-H-15A DO NOT USE-H-15A not yet drille Out of range H-16-H-16-H-16 Out of range H-16-H-16A-H-16A Out of range H-16-H-16APB1-H-16APB1 Out of range H-16-H-16B-H-16B Out of range H-19-H-19-H-19 12,175.00 11,687.98 1,316.06 1,008.26 315.07 Pass-Major Risk H-19-H-19A-H-19A 12,350.00 12,209.98 1,216.25 1,519.14 -302.85 FAIL-Major Risk --' H-19-H-19APB1-H-19APB1 12,363.37 12,177.98 1,335.18 1,578.80 -243.57 FAIL-Major Risk H-19-H-19APB2-H-19APB2 12,339.55 12,248.98 1,172.22 1,470.47 -298.18 FAIL-Major Risk H-19-H-19B-H-19B Out of range H-28-H-28-H-28 11,449.89 11,450.00 1.69 12.54 -4.65 FAIL-Major Risk H-30-H-30-H-30 Out of range H-36-H-36-H-36 11,525.00 11,750.00 1,499.29 1,471.11 56.40 Pass-Major Risk H-38-H-38-H-38 Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 10/28/2013 4.07:18PM Page 2 COMPASS 5000.1 Build 61 Rini BP BAKER HUGHES Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-28-Slot 28 Project: Prudhoe Bay WD Reference: Mean Sea Level Reference Site: PB H Pad MD Reference: 38:28 3/19/1998 15:16 @ 75.60usft(Nabors 2ES) Site Error: 0.00 usft North Reference: True Reference Well: H-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore H-28A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB J Pad J-18-J-18A-J-18A Out of range J-20-J-20-J-20 Out of range J-20-J-20A-J-20A Out of range J-20-J-20B-J-20B Out of range PB Q Pad 0-05-Q-05-Q-05 12,450.00 10,583.00 747.50 1,099.64 -331.51 FAIL-Major Risk --- 0-05-Q-05A-Q-05A 12,800.00 11,350.00 693.13 1,273.89 -580.48 FAIL-Major Risk Q-05-Q-05B-Q-05B 12,800.00 11,400.00 1,508.78 1,364.89 143.92 Pass-Major Risk Q-07-0-07-Q-07 13,600.00 11,550.00 1,020.36 1,282.56 -206.35 FAIL-Major Risk -- 0-07-Q-07A-Q-07A 13,614.34 11,425.00 960.67 1,214.00 -158.88 FAIL-Major Risk Q-07-Q-07APB1-Q-07APB1 13,614.34 11,425.00 960.67 1,213.83 -158.71 FAIL-Major Risk Q-07-Q-07APB2-Q-07APB2 13,614.34 11,425.00 960.67 1,213.83 -158.71 FAIL-Major Risk Q-07-Q-078-Q-07B 13,500.00 11,625.00 559.46 1,684.01 -1,120.96 FAIL-Major Risk Offset Design PB H Pad- H-04-H-04A-H-04A Offset Site Error: 0.00 usft Survey Program: 143-GYD-CT-CMS,11775-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +WS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) Cl (usft) (usft) (in) (usft) (usft) (usft) 11,975.00 8,926.58 12,725.00 8,978.19 388.93 39.75 -12743 3,764.22 4,485.21 3.500 1,072.82 631.51 899.75 Pass-Major Risk 11,986.83 8,931.70 12,750.00 8,977.12 388.93 39.75 -125.97 3,787.34 4,475.75 3.500 1,06726 602.69 883.18 Pass-Major Risk 12,000.00 8,937.04 12,775.00 8,976.77 388.93 39.75 -124.42 3,810.54 4,466.45 3.500 1,062.08 572.55 856.80 Pass-Major Risk 12,000.00 8,937.04 12,80000 8,975.49 388.93 39.74 -123.85 3,833.76 4,457.28 3.500 1,057.05 57267 848.20 Pass-Major Risk 12,000.00 8,937.04 12,82500 8,973.59 388.93 39.74 -12324 3,856.98 4,448.23 3.500 1,05246 572.80 839.76 Pass-Major Risk 12,014.46 8,942.47 12,850.00 8,972.33 388.93 39.74 -121.59 3,88006 4,438.72 3.500 1,048.63 542.95 806.50 Pass-Major Risk 12,025.00 8,946.13 12,875.00 8,972.29 388.93 39.74 -120.29 3,90266 4,428.03 3.500 1,04661 523.45 780.76 Pass-Major Risk 12,025.00 8,946.13 12,90000 8,972.92 388.93 39.74 -119.86 3,924.83 4,416.50 3.500 1,045.98 523.67 776.91 Pass-Major Risk,CC 12,037.32 8,950.09 12,925.00 8,973.95 388.93 39.74 -118.50 3,946.48 4,404.05 3.500 1,046.78 506.72 75029 Pass-Major Risk 12,05000 8,953.79 12,950.00 8,975.32 388.93 39.74 -117.13 3,967.99 4,391.38 3.500 1,048.33 493.54 723.35 Pass-Major Risk 12,050.00 8,953.79 12,975.00 8,976.78 388.93 39.75 -116.83 3,988.91 4,377.78 3.500 1,051.35 494.11 723.95 Pass-Major Risk 12,06085 8,956.66 13,000.00 8,97763 388.93 39.75 -115.61 4,009.10 4,363.07 3.500 1,056.06 486.68 703.98 Pass-Major Risk 12,075.00 8,959.98 13,025.00 8,977.45 388.93 39.76 -114.06 4,029.01 4,34795 3.500 1,061.71 485.14 677.91 Pass-Major Risk 12,07500 8,959.98 13,050.00 8,977.19 388.93 39.77 -113.76 4,048.33 4,332.09 3.500 1,068.54 485.90 68262 Pass-Major Risk 12,083.75 8,961.79 13,075.00 8,977.00 388.93 39.77 -112.72 4,067.16 4,315.65 3.500 1,076.52 489.50 670.54 Pass-Major Risk 12,091.21 8,963.19 13,100.00 8,976.32 388.93 39.78 -111.79 4,085.64 4,298.83 3.500 1,085.34 493.57 662.12 Pass-Major Risk 12,100.00 8,96466 13,125.00 8,975.59 388.93 39.80 -11074 4,103.54 4,281.40 3.500 1,095.27 501.08 65229 Pass-Major Risk 12,100.00 8,964.66 13,150.00 8,975.28 388.93 39.81 -110.54 4,120.66 4,263.18 3.500 1,106.58 502.06 662.12 Pass-Major Risk 12,112.60 8,966.43 13,175.00 8,975.47 388.93 39.83 -109.24 4,136.86 4,244.15 3.500 1,119.18 515.57 647.73 Pass-Major Risk 12,125.00 8,967.79 13,20000 8,975.60 388.93 39.85 -107.93 4,152.02 4,224.27 3.500 1,133.28 533.49 635.43 Pass-Major Risk 12,125.00 8,967.79 13,225.00 8,975.13 388.93 39.87 -107.81 4,166.94 4,20422 3.500 1,147.77 534.45 648.88 Pass-Major Risk 12,125.00 8,967.79 13,250.00 8,973.94 388.93 39.90 -10765 4,182.54 4,184.73 3.500 1,161.89 535.44 661.89 Pass-Major Risk 12,138.89 8,968.86 13,275.00 8,972.38 388.93 39.92 -106.15 4,19966 4,166.59 3.500 1,174.40 557.50 645.37 Pass-Major Risk 12,150.00 8,969.36 13,300.00 8,971.31 388.93 39.94 -104.91 4,218.50 4,150.20 3.500 1,185.14 578.76 632.95 Pass-Major Risk 12,150.00 8,969.36 13,325.00 8,970.74 388.93 39.96 -104.85 4,238.58 4,135.33 3.500 1,194.37 579.81 641.23 Pass-Major Risk 12,160.61 8,969.56 13,350.00 8,970.47 388.93 39.97 -103.73 4,259.69 4,121.96 3.500 1,202.18 601.90 627.09 Pass-Major Risk 12,175.00 8,969.37 13,375.00 8,970.54 388.93 39.97 -102.19 4,281.45 4,109.65 3.500 1,209.23 63124 604.92 Pass-Major Risk,ES,SF CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 10/28/2013 4:07:18PM Page 3 COMPASS 5000.1 Build 61 IHEE= . 6"CNV — WELLHEAD A XELSON{ "`2$ SAFEI• �r)TES: #1 GLM PATCt-LD OVER ACTUATOROKB ELEV= 75.38'1 BF.ELEV= 462 KOP= 1500' 211T H5-1/2"OTIS SSSV LAND NIP,D=4.562' Max Angle= 56°@ 12200'1 Datum MD= 11886' Datum TVD= 8800'SSI 2498' 5-1/2'X 4-1/2"XO GAS LFT MANDRELS 5-1/2"113G, 17#,L-80,.0232 bpf,D=4.892' —I 2498' ST NU IVD DEV TYPE VLV LATCH FORT DATE 7 3493 3200 45 MERLA RA TOP OF 4-1/2"TBG — 2498' 6 4624 4002 44 MERLA RA 5 6978 5590 52 MERLA RA 13-3/8"CSG,72#,L-80,ID=12.347' H 2818' II 4 8697 6708 46 MERLA RA 3 9787 7519 43 MERLA DM1' RM 0 10/28/13 2 10564 8043 51 MERLA RA 1 10753 8162 51 MERLA RA Minimum ID = 3.25" @ 10748' *STATION#3=DMY HAS IXTENDED PACKING 4-1/2" TUBING PATCH I I (1._...,1048' 1—TBG PATCH,D=3,25' I I 10766' —ITBG PATEN,ID=3.25' III 10831' H4-1/2"BKR L SLIDING SLV,D=3.812" I10890' —TNV TBG SEAL ASSY 10905' —9-5/8"x 4-1/2"TW FBBP PIR,D=3.958' I 10947' —14-1/2-OTiS X MP,D=3.813" TOP OF 7"LNR,—I 10958' I 10979' -14-1/2'O71S XN NP,D=3.725' 4-1/2'TBG,12.6#,L-80,.0152 bpf,ID=3.958" H 11012' / 11012' —I4-1/2'TBG TAIL,D=3.958' 11020' H I ELMO TT LOGGED 03/14/98 [5/8"CSG,47#,L 80,1D=8.681',— 11221' • ' 11670' SLM --I TOC:DUMP BAL 25 GAL CMT(10/30/13) PERFORATION SUMMARY x •• 11686'SLM HS'BKR IBP(10/26/13) REF LOG:GEARHART-BRCS ON 05/18/88 11696'—1-120/40 CARBOLITE-06/04/01 ANGLE AT TOP PERF:53<0)11864' Note:Refer to FtoduStion 0B for historiSal per/data SIZE SPF NTERVAL Opn/Sgz SHOT SQZ 11800' —{MARKER JOMT 2-5/8' 4 11864-11868 S 03/17/95 2-5/8" 4 11868-11872 S 03/17/95 2-7/8" 4 11870-11872 C 03/12/00 2-5/8' 4 11980-11982 C 03/12/00 2-5/8" 4 11980-11982 C 03/12/00 3-1/8" 4 12070-12100 S 03117/95 2-1/2" 4 12100-12114 C 04/07/95 2-1/2" 4 12120-12140 C 04/07/95 • 12227' —I FISH-TWO UNDff2REAMER ARMS-03/26/95 PBTD H 12283' 11111111 11111111 111111114 7'LNR,29#,L-80,.0371 bpf,D=6,184' HI 12326' 11.1011..11 DATE REV BY COMMENTS DA I L REV BY COMMENTS PRUGHOE BAY UNIT 05/22188 ORIGINAL COMPLETION WELL: H-28 05129/06 CO/TIM PERF CORRECTIONS(6/13/04) ., PHRMT No: 188-0440 07/29/11 SRO/PJC SET BP(07/06/11) AR No: 50-029-21806-00 11/06/13 SWC/JMD TAGGED 1BRSET TOC(10/26-30/13) SEC 21,T11 N,R13E,1243'FN._8 1265'FEL 11/06/13 SWC/JMC7 GLV C/0(10/28/13) 11 BP Exploration(Alaska) TREE= - 6"CAN VVE LFEAD= MCEVOY SAFEI, .40I ES: #1 GLM PATCHED OVER ACT_UATO_R=—ACTUATOR= PROPOSED �"� -28 OKB.BEV= 7538' BF_ELEV - 46.2' Pre-Rig KOP= 1500' 211T H5-1/2" Max Angie=__°@ — ' 0 Datum MD= Datum TVD= 8800'SS 2499' —15-1/2"X4-1/2"XO GAS LIFT MANDRELS 5-1/2"TBG,17#,L-80,.0232 bpf,D=4.892" —I 2499' ST MD IV 1' DEV TYPE VLV LATCH FORT DATE 7 3494 3200 45 MERLA DMY RA 0 TOP OF 4-1/2"TBG H 2500' 6 4624 4002 44 NERLA DMY RA 0 13-3/8"CSG,rig,L-80,o=12347-1-1 2818 , 5 6978 5590 52 NERLA DMY RA 0 4 8698 6708 46 AERLA DMY RA 0 Minimum ID = 3.25" @ 10748' 3 9787 7519 43 NERLA DMY RA 0 4-1/2" TUBING PATCH 2 10565 8044 51 MERLA DMV RA 0 1 10753 8162 51 MERLA DMY RA 0 T HH —10700' :<./.. x `, '' I I'.`,, 10748' —{TBG PATCH,D=3.25" ! 10766' H)TBG PATCH,D=3.25" 0 L10832' H 4-1/2"BKR L SLIDING SLV,D=3-812" .x" I I A,,X,, 10890' --I TNV TBG SEAL ASSY MI 10906' HI 9-5/8"x 4-112"TIW HBBP PKR,D=3.958" '4 1094T --14-1/2"OTIS X NP,D=3-813" TOP OF7"LM — 10958' f`..`'/ X -L-'-10985' 10979' HI4-1/2"OTIS XN NP,D=3.725" 4-12"TBG,12.6#,L-80,.0152 bpf,ID=3.958" H 11012" :...:-:5:?': C: 11012' H 4-1/2"TBG TAIL,D=3.958" ~/' .g.:': 11020' H ELMO TT LOGGED 03/14/98 1....:..4.9<- 9-5/8'CSG, ~'95/8"CSG,47#,L80,ID=8.681" — 11221' _J2:00t . k ' v .ix, A`• FERFORATION SUMMARY / '' REF LOG: ON / ` •• . ANGLE AT TOP FERE_°@ Note:Refer to Rod uStion DB for historiSal perf data SIZE SPF INTERVAL Opn/Sqz DATE1111 11634' H 3"BKR IBP(07/06/11) 11696' H20/40 CARBOLITE-06/04/01 11800' --i MARKER JOINT 12227' H FISH-TWO UNDE REAMER ARMS-03/26/95 PBTD — 12283' ********4 11111111111111111 7"LNR,29#,L-80,.0371 bpf,ID=6-184" ---1 123Z5' O.1.1.1A.1.1.1.1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/22/88 ORIGINAL COMPLETION WELL Hi-28 -iMD BOLT PROPOSED FERMT No: ' AIR No: 50-029-21806-0 SEC 21,T11 N,R13E,1243'FM_&1265'FEL BP Exploration(Alaska) TREE= . 6"CAN VVELLFEAD= MCEVOY SAFE.. NOIt5: #1 GLM PATCHED OVER ACTUATOR= AXELSON PROPOSED H -28 OKB.ELEV= 75.38' BF.ELEV= 462 KOP= 1500' 2117' H5-112"OTIS SSSV LAND NIP,D=4.562" Max Angle= _"@ ' 0 Datum ND_ Datum TVD= 8800'SS 2499' —15-1/2"X 4-1/2"XO GAS LIFT MANDRELS 5-1/2"TBG,17#,L-80,.0232 bpf,D=4.892" H 2499' ST MJ 10 DEV TY FE VLV LATCH PORT DATE 7 3494 3200 45 MERLA DMY RA 0 TOP OF 4-1/2"TBG 2500' 6 4624 4002 44 MERLA DMY RA 0 I 13-3/8"CSG,72#,L-130,ID=12.34T H 2818. 1—A/ ,..x.., • 5 6978 5590 52 M ERLA DMY RA 0 • � 4 8698 6708 46 MERLA DMY RA 0 Minimum ID = 3.25" @ 10748' ./'! . tt; 3 9787 7519 43 MERLA DMY RA 0 4-1/2" TUBING PATCH `•'4 2 10565 8044 51 MHULA DMY RA 0 I Top of cement between 9-5/8"and 4 — 10700' .f Z_. 1 10753 8162 51 MERLA DMY RA 0 13.70"DEPLOYM3�ff Sleeve,X3.00' 10700' x*.,••`+,. `.. I . 4, 10748' —I TBG PATCH,ID=3.25" D 3-1/2"XO 2-7/8", =2.38' H 10706' jf' :` — D 10766' ITBG PATCH, =3.25" 2-7/8"HES X NIP,D=2.313" H 10716' S• ta .A5'..%.1 V '‘, .` �`.` 10832' H4-1/2"BKR L SLIDING SLV,D=3.812" 2-718'XO 2-3/8",D=1.92' — 10727' 4e;4111- SLIDING, 10890' —ITNVTBG SEAL ASSY x; ,l►1 � 1 :►�. 10906' H9-5/8"x 4-1/2"TNV HBBP PKR,D=3.958" 10947' —14-1/2"OTIS X NP,ID=3.813" TOP OF 7"LM ',— 10958' . .P41N ITOC H —10985' 10979' H4-1/2"OTIS XN NP,D=3.725" ow 114 4-111"TBG,12.6#,L-80,.0152 bpf,ID=3.958" — 11072' A 11012' —{4-1/2"TBG TAIL,D=3.958" r 11020' —I ELMD TT LOGGED 03/14/98 1. 0 9-5/8'CSG,47#,L 80,ID=8.68r — 11221' -A Fe, A I3-12"MONOBORE WS w/CMT SIPS(_/ / ) H 1141,. .,+, r ff `.<` tom► `_ R3RFORATION SLMAARY ' �`` REF LOG: ON /__I :�� ..•. lip. A. + : -t ANGLE AT TOP PERF: "@ PBTD H ? T; A�+ Note:Refer to RoduStion DB for historiSal perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-3/8"LNR,_, bpf,D=__ —13623' 11634' 3'BKRBP(07/06/11) 11696' —120/40 CARBOLfTE-06/04/01 I 11800' —I MARKER JOINT 12227' H FISH-TWO UNDERREAMER ARMS-03/26/95 PBTD — 12283' /NAY 7"LNR,29#,L-80,.0371 bpf,ID=6.184" H 12325' /A//A/A/A/A♦A/A/ DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/22/88 ORIGINAL COMPLETION WELL 1+28 IMD BULT PROPOSED PERMT No: • AR No: 50-029-21806-0 SEC 21,T11 N,R13E,1243'FML&1265'FEL BP Exploration(Alaska) I. r 1 1 tow 1 1 1 1 1 _ , I 3 , 1 a m' i • o ► 1 Uf U '� 1 I � .h � I SS I ii d � .�= I I Ii4 1 •rrI I iv-,. ������� ff S� 1 \ � I N T , rx 1 i 0 ri 3 ; `E-m 8 2 1 Neil II N 1 1 x 1 1 I I I V ; I NW: I II , IMMIX'' O 1 I Il 1 z c� I 1 Z I II, ., a I I 7 _ F- I I awn..1.8 se0 11 . i al i u 1 I I Ir„ I I 1-- i � aI Ce i . Aja i' 1■ iFi W I 7 . 'i \ \\ .0a 1 , Mill W I al 9 ; _ I °l: `1. IR Y my T' _+g o I 4/541 2 r:0: • :E: -N, z .:, \ . 1,..,i , Ua f '• + 4a x V u : 1 1 N'm i 'x . . V \ ° 1 ...... k .�; • • 7'1 \ o I I— i 2 / r2 '4 f2 .,.,... I 4 I t... I I - ___.lam 8 + �►,, 1 0 mo — u I - 1 ' x mil, I I 0 r 1 ,/ Z F y a I 1_1 0 . I `+ I I a Fx I LL of U '1., a i 1 U I r mii s I I I -1 1 4 - :i u i e z OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. I1 Lk 1\ KL 1 `��✓E L NAME: - - f°6 a Az' zR roo ;tits : j,l ,c e„i POOL: t.-e-((--e)-e— C;('' - -- Check Box for Appro y -ia�e Letter / Paragraphs to he Included in Transrnittai Letter CI11ECI< OPT:ONS TEXT FOR APPROVAL LETTER - MULTI i The hermit is for a new wellbore segment of existing \\ell Permit LAT1AAI No. . API No. 50- (If last two digits Production should continue to be reported as a function of the original in API number are API number stated abo\e. between 60-69)) - - — -- In accordance with 20 AAC 25 00.5(f). all records. data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are Well Lo rn also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 5/2013 CO 0 0 0- N a) o m _0 C C Q a) O L E o) co Q L Q C V) co O >, N 2 a o) C O C 2' N > Lw 7. (/) CO 0 w 0) 0) O 8_ ma. c ❑ 0 0 a _ X o 0 O N O .„.. 0 .O2 a) o o cz 0 Q 3 O d ;