Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout214-020 • • STATE OF ALASKA •
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown ❑
Suspend 0 Perforate ® Other Stimulate ❑ Alter Casing 0 Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0
2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 214-020
3. Address: P.O.Box 196612 Anchorage, Development I3 Exploratory 0
AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20698-60-00
7. Property Designation(Lease Number): ADL 0028260 8. Well Name and Number: S-02AL1
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY,PRUDHOE OIL RECEIVED
11.Present Well Condition Summary:
Total Depth: measured 14034 feet Plugs measured feet SEP 14 2017
true vertical 8812 feet Junk measured feet
Effective Depth: measured 13271 feet Packer measured 9102 feet a
OGCC
true vertical 8853 feet Packer true vertical 7701.91 feet
Casing: Length: Size: MD: TVD: Burst Collapse:
Structural
Conductor 80 20"x30" 34-114 34-114
Surface 2642 13-3/8"72#L-80 33-2675 33-2675 4930 2670
Intermediate 8967 9-5/8"47#L-80 29-8996 29-7617 6870 4760
Production
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation Depth: Measured depth: 12410-12570 feet 13030-13110 feet 13160-13224 feet
True vertical depth: 8849-8860 feet feet 8861-8853 feet 8850-8850 feet
Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 27-9155 27-7746
Packers and SSSV(type,measured and See Attachment See Attachment See Attachment
true vertical depth)
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
Treatment descriptions including volumes used and final pressure:
SCANNED NOV 0 12Q17,
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 184 339 1776 1517 210
Subsequent to operation: 248 436
2772 1611 226
14.Attachments:(required per 20 AAC 25.07025.071,&25283) 15.Well Class after work:
Daily Report of Well Operations ® Exploratory 0 Development p Service ❑ Stratigraphic 0
Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0
Printed and Electronic Fracture Stimulation Data ❑ GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Authorized Name: Bergene,Matthew Contact Name: Bergene,Matthew
Authorized Title: Production Engineer Challenger Contact Email: Matthew.Bergene@bp.com
Authorized Signature: Date: (4 .Scr ��?Contact Phone: +1 9075644849
Farm 10-404 Revised 04/2017 V'TL (O /(e /17i' iI er // RB DM 8 1, l,s SEP 2 5 2617 Submit Original Only
• •
Alaska Oil and Gas Conservation Commission
333 West Seventh Avenue
Anchorage, AK 99501-3572 RECEIVED
SEP 1 4 2017
RE: BP Exploration (Alaska), Inc. AOC
Report of Sundry Well Operations Summary
September 14, 2017
To Whom it May Concern:
Attached please find the Report of Sundry Well Operations for Addition of Perforations
for Well S-02AL1, PTD # 214-020.
Sincerely,
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Attachment: Form 10-404
BP Exploration (Alaska), Inc.
P.O. Box 196612 Anchorage,AK 99519-6612
•
0)
E, 0000Oo
N- CO N O O
CO 0- O CC) Q LO
O N Tr r- r-
()U
40
E 0 0 0 CD 0
rn0000T- v _ v
m v co oD Oo ao
CO CO fO f- I-
N r- O co oD
H
co d' N
Tr CO O 0- N Tr r-
01 co N Tr OD N
N03 O T- p
'-,- 1 07373
0
;�.., J
gm
aOCDN
CD 2 Fl
0 O M Tr M N CO O O N
• M
W0 20 000
O CO
09000)0
Q� O J O r. M
N a) co
03 N O 00 N O N
U NcowNv
141 0/ N N
� O r 4
4 Ch 4
op
MO QD OOD Tr O N_
cq
J O N � r Cr) O)
W
cc 1-
0) 0
W
.N U U W
U O u_ cea r cc Z
Z W W W W
QZZZD
UfnZJJJ
• •
Packers and SSV's Attachment
PBU S-02AL1
SW Name Type MD TVD Depscription
S-02AL1 PACKER 8814.79 7475.35 7"TIW Liner Top PKR
S-02AL1 PACKER 8826.39 7484.46 7"TIW Liner Top PKR
S-02AL1 TBG PACKER 9101.91 7701.91 4-1/2" Baker SABL-3 Packer
• •
ao &
R 3 7 0 ® - \ \
R R 2 2 a. 5
I-
<
/ ac a � .0 ._ & �
t / / co 2 k / k
t , op_ _ a_ I as 2
2 E « - - / m e cn
$ 0 in E a ® ƒ � � E
- -cx2 2 = 7 7
= k t t- 2 & w2 -6
o g = U @ ® as e
>
\ % / ƒ o c/ / � � �
o / -p2 0a cri & .- ¥
c 4- - ® o o & N- IP.
%• Q f 6- § o %
a) Z.06 & 9a � / �
= 2
■ 2 -S E2 / q $ ca ƒ f
c m - f % =
o E 0 - • a)
WI W / 0- 0-C/) C 0 \ f E
as / \ C / / � 2 � as 4-7
(I) ›^
• = t = - o 2 = - ■ > co m
m ® & , o § ° o § - f S 9 % 2
- Q 'c m m \ o a o a) o C
A9 0dk ƒ 7 / ' X23 [ / _c �
= c q_ \ 5 § , o� ° E -
0n t co 6 �\ $ ALL / / ƒ a / �k2
O. $ / \ ƒ / 6 / o / f7/ f �
Ce \ % / 0_ 7 � � keg / k /�
& n o _ m 1* - = a)
O m a ® 0 c t \
/ ƒ % 2 2 f 2 O a k \ / k
D , \ f 2 J '° =CO -3 \ 2 \ m •
o 06 _ ,
m_
-o CC / o_d \/ : 0 ° k E I- t \ a
b o 0 a o 6 - eL.- 0 ca _ C
» E / - = § / 3 1_-
E k E . 0 /
¥ m § \ m 0) ® 0 . — o
%co / o 0c) 00_ 2 / / k / d N / / 2
w 7 g m _ c e
1- =- 13103 (0 °& EJ : 0 0 / ƒ / O � t \
L
0 F-
N-
� CV / 2E ®
P. / � � � �
\ = co
«
Ih •
� 6-3/8"OW •
WELLI-EAD= 13-3/8"FMC S-02A
-O2A SAFETY NOTES: WELL ANGLE>70°@ 10400'***
ACTUATOR= BAKER C CHROME TBG&LNR***MAX DOGLEG 42.80
INITIAL KB.B_EV 67' Ll 10403'***
BF B..EV= 39.16'
KOP= 3000' I I2084• H4-1/2"OTIS SSSV NP,ID=3.813"
Max Angle = 99°@ 13826'
Datum MD= WA =
_A 2613' —9-5/8"DV PKR
Datum TVD= 8800'SS GAS LFT MANDRELS
13-3/8"CSG,72#,L-80,BUTT,D=12.347" --J 2673' IL ST MD TVD DEV TYPE VLV LATCH PORT DATE
r5 *2979 82977 r 11 OTIS DOME RM r 16 03/27/15
r4 r5364 x4914 r 47 OTIS DOME RM r 16 03/27/15
r3 7430 x6362 r 42 OTIS DOME RM r 16 03/27/15
9-5/8"X 7-3/8"TIW FKR w/6'TIEBK SLV,D=? 8807' r2 x8223 x6984 r 36 OTIS DMY RA r 0 10/06/94
r1 x8737 x7399 F38 OTIS SO RM r 24 03/27/15
9-5/8"X 7"TNV LTP,HGR&TIEBK SLV,D=? — 8817' 1 J -
.-.
9-5/8"CSG,47#,L-80 BUTT,D=8.681" H —8995 MLLOUT WINDOW(S-02A) 8995'-9045'
TOP OF CR&NT 8998' •. jv4
,•• ' , .••4Wirt• H 4-1/2"SWS NP,ID=3.813"
Minimum ID = 2.377" @ 10546' :
^ • 0
S-02A
L1
I i
LI
..
L
►♦i 0i
►♦i 14
•
•
♦ ♦.
14
►♦i of
o
►♦i 0i
►♦i of
Oilof
•
►♦i14 040
►♦i •♦i
PERFORATION SUMMARY •� /i
STATE OF ALASKA
',ALASKA OIL AND GAS CONSERVATION COMM( N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0
Suspend 0 Perforate 0 Other Stimulate ❑ Alter Casing 0 Change Approved Program 0
Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Pull Liner Top Packer m
2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-020
3. Address: P.O.Box 196612 Anchorage, Development p Exploratory 0
AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20698-60-00
7. Property Designation(Lease Number): ADL 0028260 8. Well Name and Number:?,sv S-02AL1
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY,PRUDHOE OIL
11.Present Well Condition Summary: RECEIVED
Total Depth: measured 14034 feet Plugs measured feet �q
true vertical 8812 feet Junk measured feet JAN 11 2016
Effective Depth: measured 13271 feet Packer measured 9102 feet
true vertical 8853 feet Packer true vertical 7701.91 feet AOGCC
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20"x 30" 34-114 34-114
Surface 2642 13-3/8"72#L-80 33-2675 33-2675 4930 2670
Intermediate 8967 9-5/8"47#L-80 29-8996 29-7617 6870 4760
Production
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation Depth: Measured depth: 12410-12570 feet 13030-13110 feet
FEE
True vertical depth: 8849 8860 feet 8861-8853 feet SCONE
Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 27-9155 27-7746
Packers and SSSV(type,measured and See Attachment See Attachment See Attachment
true vertical depth)
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
12410'-12570',13030'-13110'.
Treatment descriptions including volumes used and final pressure:
328 Bbls NHrCI,62 Bbls 60/40 Methanol/water,160 Bbls Diesel,72 Bbls 12%HCL Acid,72 Bbls 9:1 Mud Acid,729 psi.
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 36 131 92 1490 251
Subsequent to operation: 140 173 405 1085 313
14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations Of Exploratory 0 Development IZI Service 0 Stratigraphic 0
Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0
Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com
Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer
SignatureC.i Phone +19075644424 Date 1/11/16
Form 10-404 Revised 5/2015 VT/— / // 3/1(, RBDM 4N 111016 Submit Original Only
A 143,4
• •
a. Oo00p0
f� CO N O
O N O L0 10
�O
U
y 0 0 0 0 0
co M M
3 O co
V CO co CO O CO
In N- CO — CO CO
N LO
CO CO (O I` N- I,-
CV f— CO CO CO N-
CI
H
O V N
co O N 'Cr N-
CO CO N V LL) CO N
N- CO OO
Lo C
ti N CO CO CO 10
C N Lf)
cc)
CO O O
v a
CUi i i I i
O CO
Q _J V CO 0) co �
c cooCt co N 00 lON IN
C N CO r r
• o
O O O
O 00
00 00
CD J p M M CO
co
It 4,k
.N NN_CNI Z 10 N
O 00 N •O N
U N co N7
CO N
M
t
O V (0 00 O N
C CO CO 0) CO N N
N co M C))
W
co 0� Q
0
U
W W
U o � CC CC C Z
Z Lt W W W W m
O DJ
U (n Z J J J H
• r
Packers and SSV's Attachment
S-02AL1
SW Name Type MD TVD Depscription
S-02AL1 PACKER 8814.79 7475.35 7" TIW Liner Top PKR
S-02AL1 PACKER 8826.39 7484.46 7"TIW Liner Top PKR
S-02AL1 TBG PACKER 9101.91 7701.91 4-1/2" Baker SABL-3 Packer
• •
(soa) E E (13
E D ai
o o a)o E C E
o o O (a o (a
> a) (n a) a) � a) a0 ,_ oo
O E j C O) a) N a) N
_ _ ��ll CO cu C r C r
E C co (.C) O * 0 V C C r r
D 0 a U * U J — o 0 0 0
* U (aaco * Lo * a o U U * C
* * a) r) * r * QU « * in
* Z rn a) a) — * 0 * r 0
Lo 6) u� r N r °' O ' -a
N r O 6 N
— O II a) Et a) OsL >— ' a)
r a) 0 ' U) In a) 0 u
r CL a) a J J * = a) >
J la l() C
O E u c o - .- — CO O N- O c N- v)
N a. 0 0 0 a) O N0 CO N 0 co N
* O C Q is r O
„
~
a) U 7 J O a) n * p)a n ` a
17"O
— 00 J ; (° ca(/) na � � a) O o> aQ O a) n H m m c Hm
= (NI
r • o
Z (a U Z NO } O OJ * J -. O
- aO J OO1* * * > • J i- 0 .7 NU O J * U O
co U) Ctp .O1-- * r m * NmU * Q 7 Y Y DO t 0
d -c V ` U N ,_ aCO N ' °O N
0 - ( U a) va aLO U nI I a N * Un N
O D a C
0 o a) t
ca ia o < Q N * a c�i (n
IL aaO C £ ± � 0 _C 2
70 x-O n a L O -p o0 O N p N• J UoN U co < a 0- U207F- N Qir) � C oT
p >. r C) U � Q m - H Q N 0 Q :� • L r c) - a `_
O � Q * Diua v c � c ocrQ 4-) f
* N � * � w � O � (� N -c 0_ (j (nt > cnt >
O DECO Q _ k O Ct — OO * E coau) in >
r4* O II O II m �* * 3 � C < 0 � �_
d UEt : -o a D . J O 0
DU -0 J N a)
v) 1— (a 2 (a s E o.. a) > F- 1 - o U coa) 1- 1— O O o)
in 0 w 15U0_ 0 La�)) D702UULn g o . UUin oY O D
_ L H L L 1- U) L N . O C
�' (A C () o a) - o •( o a) .0 -a .W O (aa a) N oN o a) +.
O . _ O r C us 4- 0 -5 ,- 1-D C
RS 0 N a) (nm oQCO mm � rnCh Q (n � m > E caU (nm > E ca �j
0 < U) 0 . * (n :, t\ .C o Q H C Q j5 H
_ - D O
� * * LOO * * * * (n c o U * U * �?(n O
� O , 7 00 U C ,•-• C to 0 O > •- , a) m L? >i (a a)
E * c '7Cr) D ' Da > N -C (/. 6r < -per O c6rQ -0r._ 2
7 * n N - • N N (n = (A (n N CO rU co (a r 0_
I 13-
� Uw � 0 3 � U � � 0 w � � (� U a) � O OAU) a) � O O
J 42 J > 1— "O J > J > * a) (n J > U O 2 .(1) * J > U O 2 .a?
W
Qto to to to to in to to (r) to
a 0 0 0 0 0 o o
0 0 r 0
N N N N N N N N N N
CO I� CO C0 O O O
> N N N N N CO (h r r `-
i r r r r ,- r r N N N
r r r r r r r r r r
U
Q
• r
I `
a E E @7 E EEEE
O o 0 0 r Q > E 2 2 0 0 2
4- 4- 4- 4- 4-
E
.-
c) 3Z D (1) �' DL = = D = =
N — 0 0 C C = 0_ 0 CO C C C C C
E N m C c E C C C cc
` -a C E Q 0 0 0 0 0
o_ O O N U U 5 C) U) . 0 0 0 0 0
O N M * * *
CD 0) 'o O r a) * a) a) a) a)
` r r .� • c r In ,- r r r
s a cn 6o O v v) ` v) c%) v) v)
O 2 0_ C .0 .Et j
� o N < *
*
Ta +'-' E J J CO O J W J J J J Lm
NEQO 0 O 0 0 0 OI � V) >
-
O Q N ` O O U N N N N N N
M o O U _ X CO , O O O O O •-
•
N c t V) co U 2 o_ V) a) U) C/) V) Cl) Et
(6 „ — — — — —
3 re ru * 2 E 5 - 2 C
> U) C U) U) U) U)
C rnE Ca � in > ip Z - 0_ w c � : � : � : � >
0 C o_ J '- _J O N t. c J 0 J � J J J C
C 2 a) CU L c * CY) * � cn r o-— * 0 4 `I o
L Q-' -' N N O * * * CO * * 09 * 7
0) O) U3 U r U r _ — N -3 * Y N Y N Y N Y N Y c
O ` U) C U **� N MIX O 5 C * N 9 N r c r as r U3 C
-0f0 /a '- c- 3 >�> 3 >�> ` aoo 3o 3CCn3v/) 3u))Et 3 °
r L o)— O > O > Ea Od O > O > O > O .
J _� m a) (-) o 0 3 C a�ai E olio I� > IL I1 IL *
N 3 E c cEo U) U) +� o o ED
;O 0 _0 o d o
L� co (1) -.(7.0 v v o) o -a t 52 a a c) 5 r
p N N cv) Q fYQ .cQ c v � � QN Q SQ 3Q SQ +
in * °� w cYu °o o N a3o o o in * y Q 0 3 V 3 c 3 .5 3 .0 ai
= 0 co in * co c co C ao c co I-
0 - Lm v 'CHI- *k0 *kU "" -CI - E02 c # m70 I* o *k o *k o *k L
r_ co o_ O-= Q• o D * D * .Q N O S „ O ct O D (n � n U D U D U D L
O c e O- U) 3 0 J U) ~ S I- _ C O J c j G_ a . U) 1- 0 O• c c:'
H * H * I- * H
N O � L oU U In CNI EU Ln cv U — 0 — U — U =
A m o n .S w U U N o . uj o -0 73 fl cp C N U N ° , a� a) N a>)
0 H .E ' if o E O O Q FAQ F2 1 E M o -0 0 Q O ~ E * Q o Q o Q o Q o
� cn cn Ln ` r X N * O - *
U � a Ln u, � * Q * QU(Aa c ca � v) * QUcn * * IL * ti * LL * IL
003aE0 �, 0 - * v * gEy }, 33 0v * _ E a) :1- * v * v *
Ln , co mr O.- u) Lo Ln U o '3 o E e)'-' Lo in 5 0 •_. Lo is Lo "J Lo
r Q O >. -0- '- -Cd O C = C ‘- v- < Q"O EO o_ O C ‘- r Q 9— 0- c ,- c ,- c ,- c ,-
--
c r c r c r c r
3 3 a ca Er LOd = N 3 Sa J � aOci � c EOiO 'nOcpOr�
O � .- r-- O O m C N C CO - 'C N 0 N N • - N N CO .> '+J U N) N N N Ln N O (-Ni
0 o _C
0) _o
'N o ~ � H � ("Jj = voi QUI- (� CO � HHf- H �
I_ IDU c �N * CCc>nCC co c>nI- -0UCCO _ 0oM ? fYu>) I--0 * * CC .. . CC ACC CC >A
00 : it "O - 2 as * J > J500 : J m .o o N * _1500 : CC * J > J > J > J >
LC) L() Lf) Lf) L[) Lc) 10 Lf) Lf) Lo
r r r r r r r r r N-
C)
O O C) C) O C) C) C) C) O
N N N
N N M CO NY L j CO N- CO
N N N N N N N N N N
r r r r r r r r r r
. II 40
E / /
L.0 ƒ E \
U ± w °
m ® R z
f ico 2
0
< 7 (0
/ 2m Lac
\ W / / k
$ O m ± E / O
- 1--± Z 11- .7\
$ u 22 ee/ C
$ ± I-
0 / w m = n ®
0 0 / w / k \ �
w 0_ ,(51-0 (7)
eL
7 co w w / / \ 0
= u m m II
C ƒ 0 E 0 ® w -0 2
o r -1 I a w
_I U) 2 / o \ I = E
E ± e
• » / / k \ / ± 3 b 0 D /
0. 0 = ± Cr_ ¥ 2 R ® U cnR
- _ � � 0 9 / / / \ / / k
2 $ @ m a a 2 = 3
" / � \ k -j / � / /
o 9 y $ *5 ® t _ƒ 2 \ § o
r / 0\ / U_ ƒ CEO - / 7 /
o 7 § 2 ƒ 61- 7--- % 2 / ƒ fx \ E G \
o p g ƒ / ,-,----,<C --.7 2 —I ± ¥ 2 E c
� k / / 0_ / / / ,< � < \ kk /
03 $ t ,-,Z p » ± 2 O , / \ / / \ ƒ \
\ \ / / / wow/ / c = \F -
u - ± r co \ E 4
f0 / z / EQ RoLO
c „,„
-,=-00z0120= 5 \ 2
Dr - ƒ ƒ O ¥ � 0 O =E;5 / -/ \ m / \ f
2@ � <_ -
w = w / \ \ U O / I \ \ ƒ 0 f o_ w / -1 0 -07c;
\ ' / 0 \ / E / / $ / ƒ / 3 ƒ o - \ f \ / $ / / /
_J % t m t t « t : R I ± « t C \> Z / 2 ƒ O / / / ƒ
m o to r r
/ \ N d \ W r N- 000 ,- CO
a A 6 w r--
,_ s � � / ne & & c &
E # ,- m
� \ C.1 \ \
6318"G4V
• --11,,NOTES: W ELL ANGLE>70° 10400'
WELLPEAD= 13-3/8"FMC S_0 2A CHROME TBG&LNR"""MAX DOGLEG:42.8° "*"
" ACTUATOR= BAKER C
NTIAL KB.ELEV 67' Ll 10403'"""
BF.ELEV= 39.16'
I
KOP= 3000 I2084' H 4-112"OTIS SSSV NP,N3=3.813"
Max Angie = 99"@ 13826'
Datum MD= N/A 2613' -19-5/8"DV PKR
Datum ND= 8800'SS GAS LFT MANDRELS
13-3/8"CSG,72#,L-80,BUTT,D=12.347" -1 2673' }--41 I ST MD TVD DEV TYPE` VLV LATCH PORT DATE
'5 '2979 '2977 ' 11 OTIS DOME RM r 16 03/27/15
r4 '5364 '4914 r 47 OTIS DOME RM r 16 03/27/15
'3 '7430 '6362 '42 OTIS DOME RM r 16 03/27/15
9-5/8"X 7-3/8"TIW PKR w/6'TEBK SLV,D=? 8807' '2 1.8223 r6984 r 36 OTIS DMY RA r 0 10/06/94
9-518"X r TtW LW,HGR&TEBK SLV,D=? -1 8817' ! 1jj1 8737 7399 r 38 OTIS SO RM r 24 03/27/15
(9-5/8"CSG,47#,L-80 BUTT,D=8.681' -{ -8996 WILLOW'WINDOW(S-02A) 8995'-9045'
TOP OF CaU'IT H 8998' �• :#3,
r• �� 9041' -I 4-1/2"SWS NP,D=3.813'
Minimum ID = 2.377" @ 10546' :
• S-02A 0
L1
I 411.1
L
1404 I O
•
14
14• g
•
14
•
14
14
•
14 r4
14 Ir.
•
►moi *i
1i , •pi
14 r4
14 r4
•
PEfZFORATION SUMMARY 14
•14 r4•• r
4 r4
REF LOG SPERRY MU.D ON 09/22/94 Vii. ••a,♦v
ANGLEATTOP PERE N/A 1•4 tri
♦ ♦.
Nate:Refer to Production DB for historical pert data 1•� •�
SIZE SFF INTERVAL Opn/Sgz SHOT SOZ e s`
S-02A
3-3/8" 6 10400-10410 0 06/28/03
3-3/8" 6 10555-10570 0 06/28/03 F..:
3-3/8" 6 10582-10597 0 06/28/03 —
2-7/8" 6 10620-10645 0 05/11/02
2-7/8" 6 10675-10700 0 05/11/02
2-7/8" 6 10772-10792 0 03/30/98
2-3/4" 6 10792-10854 0 09/28/94
2-718" 6 10854-10874 0 03/30198 S-02A L 4.`" %i.
2-3/4" 6 10860-10960 0 11/02/94 wawa
`�..z
6 10792-10960 0 03/31/98
al......,......."...
3-3/8" 6 11075- 11090 0 06/28/03 a • ''"'"ts .
3-3/8" 6 11165-11180 0 06/28/03 "41-comp,"........‘
3-3/8" 6 11220-11235 0 06/26/03 E ►�
3-3/8" 6 11380-11395 0 06/26/03 '
3-3/8" 6 11430-11445 0 06/28/03 ,
4-1/2" SLID 11526-118681 0 109/28/94 I I
2-7/8" SLID 11829-12098 0 i 09/28194 I I
S-02A L1
2" 6 12410- 12570 0 06/25/14 j91 i -
2" 6 13030-13110 0 06/25/14 I I
I I
$-021
I I
AJ
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
03/27/82 INTIAL COMPLETION 12/22/15 DLWJMD FULLED LTP(12/17/15) WaL: S-02A L1
10/07/94 N18E SIDETRACK(S-02A) PERMIT No: 1941090,2140200
04/12/96 CTU SIDETRACK EXT(2-7/8"LNR) AR No; 50-029-20698-01(60)
06/27/14 NORDIC 1 CTD ML(S-02A L1) SEC 35,T12N,R12E,1630 FM..&867'ANL
03/26/15 JTG/PJC SET LTP
03/27/15 JIG/PJC GLV 00 _ _� J BP Exploration(Alaska)