Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-024STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS JUL 18 %!'la 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plugfor Redrill ❑ Perforate New Pool ❑ Re pair Well ❑ Re-enter Sus Well ❑ p Other: CAICD Ii Swell Packeromplide 0 2. Operator Name: BP Exploration (Alaska), Inc 14. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Dnll Number. 214-024 3, Address: P.O. Box 196612 Anchorage, AK 99519-6612 I Straligrephic ❑ Service ❑ 6. API Number: 50-029-20735-03-00 7. Property Designation (Lease Number): ADL 028305 5 028285 8. Well Name and Number PBU C -19C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: CCL PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary. Total Depth: measured 15107 feet Plugs measured 14320 feet true vertical 9039 feet Junk measured 14640, 14886 feet Effective Depth: measured 14320 feet Packer measured 2973 feet true vertical 9046 feet Packer true vertical 2971 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" x 30" 48-128 48-128 Surface 2652 13-3/8" 48-2700 48-2699 5380 2670 Intermediate 3239 9-5/8" 46-3285 46-3281 6870 4760 Liner 8404 7" 3105-11509 3103-8444 7240 5410 Liner 2161 2-3/8" 12164 - 14320 8958-9046 Liner 12084 4-1/2" 3022-15106 3020-9039 8430 7500 Perforation Depth: Measured depth: 12378 -15015 feet True vertical depth: 9034-9038 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 43-3050 43-3049 Packers and SSSV (type, measured and 4-1/2' HES TNT Packer 43-3050 43-3049 true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured). Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Shut -In Subsequent to operation: No Test Available 150 60 14.Attachments: (regu,re4 per 20 MC 2507925071, a 25,2e0) 15. Well Class after work. Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ SUatigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WOSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-215 Authorized Name: Lastufka, Joseph Contact Name: Hyatt, Trevor Authorized Tille: SI Specialist�7 Contact Email: Trevor.HyattAbp.com l � Authorized Signature: Date. //IQAIq Contact Phone: +1 907 564 4627 Form 10-404 Revised 04/2017 0111 m&ilm"i RBDMSl-�✓JUL 191019 Submit Original Only Printed 711112019 10:16:42AM **All dephs reported in Drillers Depths" North America - ALASKA - BP Page 1 of 7 Operation Summary Report Common Well Name. C-19 AFE No Event Type: WORKOVER (WO) Stan Date. 6/24/2019 End Date. 6/30/2019 X4 -01i (1,800,000,00) Project Paid Site: C Rig Name/No.: CDR -2 Spud DateTme: 5/23/1982 12:00:00AM Rig Release: 6/30/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000648 Active datum: KB @79,32us@ (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR). _ 6/24/2019 08:30 - 09:30 1.00 MOB P PRE RIG MOVE OPERATIONS -HOLD PJSM WITH RIG CREWAND PEAK TRUCKING TO MOVE RIG OFF 15-27B - EMPHASIS ON GOOD COMMUNICATION, VERIFY STOP COMMAND. - STOP BLOCK IN PLACE TO PREVENT RIG FROM ROLLING BACKWARDS INTO WELL. '- VALVES ON TREE SHUT IN AND ALL ANNULUS PRESSURES LESS THAN 50 PSI. - DRILL SITE OPERATOR NOTIFIED AND DECLINED WITNESSING RIG MOVE OVER WELL. - ANYONE CAN STOP THE JOB ATANYTIME BE WATCHFUL - MOVE MAIN AND PIT SUBS OFF WELL -INSTALLJEEPS _ - MOVE TO ENTRANCE OS PAD 09:30 - 12:00 2.50 MOB P PRE WAIT FOR SECURITY (CHANGE OUT DAY) AND MATS _ 12:00 - 15:30 3.50 MOB P PRE MOVE RIG TO C -PAD 15:30 - 16:00 0.50 MOB P PRE -*RIG ACCEPT AT 16: 00"' 16:00 - 00:00 8.00 RIGU P PRE FINISH SPOTTING RIG OVER WELL. 'RIG UP CHECKLISTS - PERFORM LTT TO 3501 GOOD TEST -NIPPLE UP BORE / MPD LINE. 6/25/2019 0000 - 02:00 2.00 RIGU P PRE FINISH NIPPLE UP OF BORE. - STACK INJECTOR ON WELL - VALVE CREW CHECK TORQUE ON BOLTS TREE. 02:00 - 04:30 2.50 RIGU P PRE _-GREASED _ LOAD COIL WITH FRESHWATER AND FLUID ,PACK SYSTEM SHELLTEST Printed 711112019 10:16:42AM **All dephs reported in Drillers Depths" North America - ALASKA - BP Page 2 of 7 Operation Summary Report Common Well Name: C-19 AFE No Event Type: WORKOVER (WO) Start Date. 6/24/2019 End Date: 6/30/2019 X4-016PJ-E: (1,800,000.00 ) Project: PBU Site: C Rig Name/No.: CDR -2 Spud Date/Time: 5/23/1982 12:00 OOAM Rig Release: 6/30/2019 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000648 Active datum: KB @79.32usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 04:30 - 12:30 8.00 BOPSUR P PRE INITIAL ROPE TEST TO BP / AOGCC CRITERIA 250 PSI / 3500 PSI FOR 5 MIN EACH. - TEST 1: IRV, PACKOFF, C9 BACKWARDS C10 BACKWARDS PASS - TEST 2: MASTER VALVE 2, BLIND / SHEAR, R1, BL1A, B1, B4 PASS - TROLLEY INJECTOR BACK, INSTALL TEST JOINT WITH TEST CAP FOR 2-3/8" - TEST 3: ANNULAR (2-3/8") TIW41, B3, B2, 1311- PASS - TEST 4: UPPER 2-3/8" PIPE / SLIP, TI W #2, 31-2, R2, T2, C15 - PASS - TEST 5: C16, T1, C11 - PASS "'C16 FAIUFAIL"' - TEST 6: VARIABLES, (2-3/8"), C7, C9, C10, TV2-PASS - TEST 7: LOWER 2-3/8" PIPE / SLIP, C5, C6, CB, TW -PASS -TEST B: CHOKE A, CHOKEC - PASS PERFORM ACCUMULATOR DRAW DOWN NEST INSTALL SAVER SUB - TEST 9: ANNULAR (3-1/2") Cl, C4 - PASS (3-1/2" USED AS WE ARE LOOKING ATADDING 'A3 -1/2"X -NIPPLE) - TEST 10: VARIABLES (3-1/2") C2, C3 - PASS REPAIR C-16 - TEST 11: C-16. PASS 10:30 RD TEST EQUIPMENT INSTALL BHI FLOATS AND TEST GOOD TEST 12:30 - 14:30 2.00 BOPSUR P PRE PREPARATIONS TO RIH -SWAP OUT TESTING LUBRICATOR FOR DRILLING LUBRICATORS - GET STACK MEASUREMENTS - SWAP OUT ALL ELASTOMERS ON THE INJECTOR - GREASE MANUAL VALVES ON CHOKE 8 KILL LINES -CHECK SADDLE CLAMPS 14:30 - 20:00 5.50 KILLW P 14,320.00 OTHCMP WELL KILL OPS - MU NOZZLE BHA - STAB ON, FLUID PACK THE COIL WITH METH SPEAR AND KCL - COIL DISPLACED, PT LUBRICATOR -GOODPT - LINE UP WELL TO A CLOSED CHOKE, B PSI ON WELL - RIH TAKING RETURNS TO THE TT HOLDING 100 PSI WHP - 2800' GETTING A LITTLE GAS BREAKING OUT OF THE CRUDE -RIH TO BOTTOM. KILL PUMPS. DRY TAG PLUG AT 14320'W/ 5K DOWN - PU OFF BOTTOM 73K WITHOUT LUBES. - CIRCULATE 1% SLICK KCL W/ 0.6% BARALUBE W-520 FOR WELL KILL. -MINIMAL RELIEF FROM HIGH PU WEIGHTS. DISCUSS WITH ODE / WSUPT. INCREASE W-520 TO 1.6% Printed 7/11/2019 10:16:42AM **All dephs reported in Drillers Depths" Common Well Name. C-19 Event Type: WORKOVER (WO) North America - ALASKA- BP Operation Summary Report Start Date: 6/24/2019 AFE No End Date: 6/30/2019 X4-016PJ-E:(1,800,000,00) Project: PBU Site: C Rig Name/No.: CDR -2 Spud Date/Time: 5/23/1982 12:00:OOAM Rig Release: 6/30/2019 Active datum: KB @79.32usft (above Mean Sea Level) Date From - To Him Task Code 14,320.00 (hr) _ -GRADUALLY STARTED CREEPING BACK UP 20:00 - 00:00 4.00 KILLW N 6/26/2019 00:00 - 04:00 4.00 KILLW N 04:00 - 06:00 2.00 KILLW N 06:00 - 09:30 3.50 KILLW P 09:30 - 11:30 2.00 PERF P 11:30 - 1230 1.00 PERF N Page 3 of 7 NPT Total Depth Phase Description of Operations . _ (usft)_ 14,320.00 OTHCMP CIRCULATED -GRADUALLY STARTED CREEPING BACK UP TO 6"7K, PULLING 20 FPM. 14,320.00 OTHCMP TRIED PULLING 20 FPM AFTER THE INCREASED CONCENTRATIONS OF WFS-520 (1.6%) WERE CIRCULATED SURFACE TO SURFACE. AFTER PULLING 60 FOOT WEIGHTS STARTED CREEPING BACK UPAND CYCLING TO 66/ 67K. SIGNS OF FRICTIONS STILL UP HOLE. MAKE ROOM FOR IST LOAD OF 8.5 PPG LOVIS, 2.25% LUBES. 8.7K LSRV. BRING ON _ LOVIS_ 14,320.00 OTHCMP RIH TO BOTTOM, SEND 8.5 PPG LOVIS 2.25% LUBES 8.7K LSRV '- 2.01 BPM IN RATE: 2.11 BPM OUT RATE -8.48 PPG IN /8.35 PPG OUT -RIH WEIGHT 24K, LIGHTLY TAG CIBP WHEN LOVIS COMING OUT NOZZLE - TAG CIBP. LET 5 BBLS OUT. PU TO BREAKOVER OF 70K - CIRCULATED 35 BBLS AROUND. PULLUP _ . HOLE. FRICTION MUCH BETTER. 63-65K 14,320.00 OTHCMP . POOH OPS - PURGE LUBRICATOR BEFORE SHUTTING DOWN TO FLOW CHECK -SHUT DOWN AND FLOW CHECK WELL DISCUSS THE POTENTIAL FOR WELLBORE FLUIDS TO COME INTO THE WELLBORE AFTER SHUTTING DOWN THE PUMPS TO FLOW CHECK, MONITOR OUT MICRO -MOTION FOR INCREASE IN FLOW OR DROP IN DENSITY. IF ANY CHANGES OCCUR, TAKE RETURNS OUT TO TIGER TANK - GOOD NO FLOW, POOH - OOH, FLOW CHECK WELL - GOOD NO FLOW, PU INJECTOR AND LD THE NOZZLE BHA 14,320.00 OTHCMP PERFORATING OPERATIONS - LOAD HES PERF GUN HANDLING TOOLS ON THE RIG AND RIG UP TO RUN GUNS - HOLDA PJSM TO MU PERF GUNS REVIEWING HES AND NABORS PROCEDURES - MU PERF GUNS AS PER WELL PLAN - 11:20 STOP THE JOB, HES DOES NOT HAVE THE PROPER LIFTERS FOR THIER GUNS TO USE THEIR SINGLE JOINT ELEVATORS. 14,320.00 OTHCMP - WAIT ON A SET OF ELEVATORS THAT WILL WORK WITH THE LIFTERS THEY HAVE TO PU Printed 7/11/2019 10:16 42AM **Ali dephs reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 4 of 7 Common Well Name: C-19 00:00 - 00:30 AFE No Event Type: WORKOVER (WO) Start Date. 6/24/2019 End Date: 6/30/2019 X4-016PJ-E: (1,800,000.00 ) Project: PBU Site: C AND HES. Rig Name/No.: CDR -2 Spud Date(Time: 5/23/1982 12:00:00AM Rig Release: 6/30/2019 Rig Contractor: NABORSALASKA DRILLING INC. _ _ _ THE PIPE SHEDAND PICKS UP SAFETY BPUOI: USA00000648 Active datum: KB @79.32usft (above Mean Sea Level) 'JOINT, TORQUES IT UP. Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr).. _—.(usft) WELL IS SECURED IN 3 MIN. 12:30 - 18:30 6.00 PERF P 14320.00 OTHCMP ALL HANDLING EQUIPMENT IS RIGGED HOLD 18:30 - 00:00 5.50 6/27/2019 00:00 - 00:30 0.50 00:30 - 01:00 0.50 01:00 - 02:00 1.00 02:00 - 02:30 0.50 PERF P 14,320.00 OTHCMP PERFORM 10 MIN FLOW CHECK - BLEED CHOKE PRESSURE DOWN. -PERFORM FLOW CHECK WELLONAVERY SLIGHT VACUUM. 02.30 - 05:30 3.00 PERF P 14,320.00 OTHCMP POOH WITH GUNS - MUD WEIGHT: 8.50 PPG IN, 8.44 PPG OUT RATE: 2.03 BPM IN, 1.53 BPM OUT 3 BPH LOSS RATE -COME TO SURFACE, RIH TO JOG. CIRCULATE BOTTOMS UP TO TIGER TANK. CIRCULATE TILL GUN CO CLEANEDUP. POOH TO 100'. BURP RISER TO TIGER TANK. Printed 7/11/2019 10:16:42AM "All dephs reported in Drillers Depths" A PJSM WITH BEARDS CREW TO PU GUNS.CONTINUE WU PERF GUNS. CONDUCT TRIP DRILL WITH BEARD CREW AND HES. CREW TAKES GUN OFF THE SKATE DOWN TO THE PIPE SHEDAND PICKS UP SAFETY 'JOINT, TORQUES IT UP. DRILLER SIMULATES SHUTTING IN WELLAND ALL CREWS REPORT TO POSITION. WELL IS SECURED IN 3 MIN. iCONDUCTAAR. CONTINUE WU PERF GUNS. MU BTS -6 AND BHI TOOLS INJECTOR ON: 18:20 PERF P 14,320.00 OTHCMP RIH WITH PERFORATING BHA#2 - RATE: 1.63 BPM IN, 1.97 BPM OUT. CIRC PRESSURE: 815 PSI - MUD WEIGHT: 8.49 PPG IN, 8.45 PPG OUT - LOG CCL FROM 13,375' TO TO W/ 5K DOWN ON PLUG 14332.38' ',- LOG CCL FROM BREAK OVER 14223.4' TO _ 13700' FOR_ CORRELATION PERF P 14,320.00 OTHCMP PERFORM CCL LOG OFF OF CIBP TO 13700' - TIE IN TO BAKER HUGHES RPM LOG DATED 06 -OCT- 2018 WITH -8' CORRECTION _ - CORRECT DEPTH TO TOP SHOT DEPTH PERF P 14,320.00 OTHCMP PERFORATE - PERFORM PULSING SEQUENCE PER HALLIBURTON REP -PULL TO DEPTH -GOOD INDICATION SHOTS FIRED, PERFORATION INTERVALS -12.378' - 12.488' -12,636'- 12,828' 13.108' _ -12.948' - -13,228'- 13.324' _ -13,444' - 13,540' PERF P 14,320.00 OTHCMP COME ONLINE DOWN COILTO TRYAND CATCH FLUID - INITIALLY MINIMAL RETURNS - 2.56 BPM IN RATE / 1.90 BPM OUT RATE - LOSE 356BLS WHILE PULLING ABOVE PERF INTERVAL WITH 200 PSI CHOKE. - FULL RETURNS SLOWLY COMING BACK 02:00 - 02:30 0.50 PERF P 14,320.00 OTHCMP PERFORM 10 MIN FLOW CHECK - BLEED CHOKE PRESSURE DOWN. -PERFORM FLOW CHECK WELLONAVERY SLIGHT VACUUM. 02.30 - 05:30 3.00 PERF P 14,320.00 OTHCMP POOH WITH GUNS - MUD WEIGHT: 8.50 PPG IN, 8.44 PPG OUT RATE: 2.03 BPM IN, 1.53 BPM OUT 3 BPH LOSS RATE -COME TO SURFACE, RIH TO JOG. CIRCULATE BOTTOMS UP TO TIGER TANK. CIRCULATE TILL GUN CO CLEANEDUP. POOH TO 100'. BURP RISER TO TIGER TANK. Printed 7/11/2019 10:16:42AM "All dephs reported in Drillers Depths" Common Well Name: C-19 Event Type: WORKOVER (WO) Project: PBU -- — North America - ALASKA- BP Operation Summary Report AFE No _ Start Date: 6/24/2019 End Date. 6/30/2019 X4-016PJ-E'. (1,800,000 00 ) Site: C Rig Release: 6/30/2019 Page 5 of7 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000648 Active datum: KB 4?79.32usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 05:30 - 12:30 7.00 PERF P 14,320.00 OTHCMP _ FLOW CHECK AT SURFACE IS GOOD, NO FLOW. CONDUCT PJSM WHILE FLOW CHECK FILL WELL WITH 1.3 BBLS AFTER FLOW CHECK THEN LIFT INJECTOR OFF, INSPECT LAST 100' OF PIPE. NO PIPE DAMAGE SEEN. LAY DOWN COILTRAK AND 6 JTS OF BTS -6. INJECTOR OFF AT 06:30. FILL WELL AS NEEDED TO KEEP FLUID NEAR 'SURFACE. 12:30 - 13:30 1.00 CLEAN P 14,320.00 OTHCMP LAST GUN OUT OF WELL. TOP OFF WELL, CLEAN AND CLEAR RIG FLOOR. OFFLOAD HES GUN HANDLING EQUIPMENT. ___ _ _ 'LOAD 2 JTS OF BTS -6 INTO PIPE SHED. 13:30 - 15:00 1.50 CLEAN P 14,320.00 OTHCMP WUBHA#3. .INJECTOR ON AT 02:05. ZERO DWOB, TEST QTS AND COILTRAK. TROUBLESHOOT DWOB TARE VALUE 15:00 - 18:00 3.00 CLEAN P 14,320.00 OTHCMP RIHBHA#3. 18:00 - 19:30 1.50 CLEAN P 19:30 - 23:00 3.50 CLEAN P AT 2500' GETTING LIGHT RETURNS, GOES TO 7.8 PPG. STOPAND FLOW CHECK 10 MIN, NO FLOW. WHP=O. ZERO LEL. LIKELY PERF GAS FROM LAST RUN. NOTIFY WOS DAVE NEWLON AND CTD SUPT, CIRCULATE OUT TO TIGER TANK AND CONTINUE RIH UNTIL RETURNS CLEAN UP. AFTER 50 BBLS PURGE CT LUBRICATOR AND _ BRING RETURNS BACK INSIDE. _ 14,320.00 OTHCMP MILL 3.81" XN NIPPLE - 54K PUH WEIGHT / 23K RIH WEIGHT -DRY TAG NIPPLE AT 11359' MD PU AND GET PARAMETERS - FREE SPIN: 1860 PSI @ 2.81 BPM 312 PSI DIFFERENTIAL PRESSURE - RATE: 2.81 BPM IN, 2.81 BPM OUT - MUD WEIGHT: 8.53 PPG IN, 8.45 PPG OUT - DWOB: 0.0 KLBS -MINIMAL MOTOR WORK. MILLEDAT2FPH. - PERFORMED 2 REAMING PASSES. - DRY DRIFT NIPPLE 14,320.00 OTHCMP RIH WITH 3.80° MILLING BHA#3 - RATE: 2.49 BPM IN, 2.64 BPM OUT. CIRC PRESSURE: 1534 PSI MUD WEIGHT: 8.51 PPG IN, 8.44 PPG OUT -RIH 7014328'. LIGHTLY TAG PLUG INCREASE RATE TO 2.80 BPM IN RATE. PUH TO 12000' PERFORM JOG. PUMP BOTTOMS UP. - 10 MIN FLOW CHECK WHILE OPENING EDC. LOG DOWN FOR TIE-IN FROM 12700'TO 12900' MD (JEWELRY) WITH -7' CORRECTION TO BAKER RPM LOG DATED 6-OCT-2018 -DRYDRIFTTOTO NOISSUES. - PICK OFF BOTTOM. - PERFORM 10 MIN FLOW CHECK, WELL STATIC Printed 7/11/2019 10:16A2AM "AII dephs reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 6 of 7 Common Weil Name. C-19 AFE No Event Type: WORKOVER (WO) Start Date 6/24/2019 End Date. 6/30/2019 X4-016PJ-E: (1,800,000.00 ) Project: PBU Site: C Rig Name/No.: CDR -2 Spud Date/Time: 5/23/1982 12:00 OOAM Rig Release: 6/30/2019 Rig Contractor NABORS ALASKA DRILLING INC. BPUOI: USA00000648 Active datum: KB @79.32usft (above Mean Sea Level) _ _ Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr)_ _ (usft) 23:00 - 00:00 1.00 CLEAN P 14,320.00 OTHCMP POOH - MUD WEIGHT: 8.54 PPG IN, 8.45 PPG OUT - RATE: 3.34 BPM IN, 2.92 BPM OUT - PAINT YELLOW FLAG AT 12039.62' BIT f DEPTH (11930.06' EOP) 6/28/2019 00:00 - 03:30 3.50 CLEAN P 14,320.00 OTHCMP . POOH PAINT WHITE FLAG AT 9076.38' BIT DEPTH (8966.82' EDP) - 4.01 BPM IN RATE / 3.73 BPM OUT RATE CHASED 20 BBLS OF HIVIS OUT HOLE. -8.55 PPG IN /8.44 PPG OUT '- STOPAT 100'. PERFORM 10 MIN FLOW CHECK WELL STATIC -LAY DOWN BHA. TIGHT 3.79" GO / 3.78" NOGO ON BOTH REAMER AND MILL 03:30 - 0600 2.50 CASING P 14,320.00 RUNCMP CLEAN AND CLEAR RIG FLOOR - PREPARE FOR UPCOMING LINER JOB - INSPECT PACKOFFS, TEST TO 250 PSI LOW 3500 PSI HIGH 06:00 - 1800 12.00 CASING N 14,320.00 RUNCMP SERVICE INJECTOR. INSPECT TOP DRIVE AS PART OF NABORS DROPPED OBJECT MANAGEMENT SYSTEM. SERVICE SHAKER. GREASE CROWN SHEAVES. INSPECTAND SERVICE SKATE AND LEVELWIND. SERVICE GEN 1 AND 2. RIG HOUSEKEEPING. 18:00 - 20:00 2.00 CASING N 14,320.00 RUNCMP _ LINERARRIVED. - RUN THROUGH TALLY WITH NORTHERN SOLUTION. -SET UPTALLYAND SEND TO ODE .20:00 - 00:00 4.00 CASING IN 14,320.00 RUNCMP BRING LINER IN AND SET UP FOR RUNNING. 6/29/2019 00:00 - 01:00 1,00 CASING P 14,320.00 RUNCMP PJSM, - RUN THROUGH LINER ORDER WITH INCOMING CREW. -_SEND DRAFTTALLY OFF TO ODE. 01:00 - 03:30 2.50 CASING P 14,320.00 RUNCMP MAKEUP LINER PER APPROVED TALLY -MAKE UP FIRST BLAST JOINT. TORQUE WITH LITTLE JERKS. NOT SHOULDERING - DISCUSS PLAN FORWARD WITH ODE AND ACTING WSUPT DAVE NEWLON. -VERIFY TORQUE PLAN. HIGHERTORQUE GIVEN. JOINT SHOULDERED 03:30 - 08:00 4.50 CASING P 14,320.00 RUNCMP CONTINUE RUNNING COMPLETION KICK DRILL WITH WARD CREW AFTER ASSEMBLY #251S PICKED UP. DRILLER ACTIVATES BOP ALARM. CREW TAKES JOINT BACK DOWN TO THE PIPE SHED AND BRINGS UP SAFETY JOINT. SAFETY JOINT IS TORQUED UP, RUN IN, DRILLER SIMULATES CLOSING IN WELL. ALL CREWS REPORT TO POSITIONS. WELL SECURED IN 4 MIN 20 SEC. CONDUCT AAR WITH CREWS. CONTINUE RUNNING COMPLETION. Printed 7/11/2019 10:16:42AM **All dephs reported in Drillers Depths" Common Well Name: C-19 Event Type'. WORKOVER (WO) North America - ALASKA - BP Operation Summary Report AFE No Start Date: 6/24/2019 End Date'. 6/30/2019 X4-016PJ-E: (1,800,000.00 ) Page 7 of 7 Project: P13U Site: C Rig Name/No.: CDR -2 Spud Date(Time: 5/23/1982 12:00.00AM Rig Release 6/30/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000648 Active datum: KB @79.32usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations - __- (hr) _ Wait) 08:00 - 08:30 0.50 CASING N 14,320.00 RUNCMP SMALL WAD OF METAL SHAVINGS FOUND IN BLAST JOINT #42 (SINGLE) AFTER IT IS MADE 08.30 - 1200 3.50 CASING P 12:00 - 15:30 3.50 CASING P 15.30 - 20:00 4.50 CASING P 20:00 - 00:00 4.00 RIGID P 6/30/2019 00:00 - 02:30 2.50 RIGID P Printed 7/11/2619 10.16:42AM "Ali dephs reported in Drillers Depths" UP, ABOUT A HANDFUL. LAY IT DOWN AND CLEAN IT OUT. INSPECT #41 WITH FLASHLIGHT, CLEAR. _ DRIFT REMAINING BLAST JOINTS, CLEAR. 14,320.00 RUNCMPf CONTINUE RUNNING COMPLETION. PICK UP COILTRAK AND GS SPEAR, LOWER DOWN TO CORRECT SPACEOUT FOR STRIPPING DOWN. PJSM AND REVIEW PROCEDURE FOR STRIPPING DOWN. STRIP DOWN OVER LINER AS PER NABORS PROCEDURE -AND _M/U QTS. 14,320.00 RUNCMP RIH WITH COMPLETION. PUMP 0. /420 PSI WHILE RIH. WEIGHT CKAT 10900' IS 67K. STOP AT FIRST FLAG AND CORRECT -17.8'. CONTINUE RIH. ROLL PAST 2ND FLAG WITHIN V OF CALCULATED DEPTH. CONTINUE RIH. LIGHT TAG AT 14307'. UP WEIGHT IS 68K. PUMP 2 BPM TO ACTIVATE GS RELEASE, PICKUP IS 60K. STING BACK IN AND PICK UP AGAIN AT MIN RATE, 68K. 14,320.00 RUNCMP CIRC DIESEL DOWN TO NOZZLE. WHEN DIESEL ROUNDS THE NOZZLE HOLD 300 PSI WHIP. PUMP 20 BBLS DIESEL UP THE LINER X TUBING ANNULUS THEN UNSTING. POOH, PUMP DIESELAND KEEP 300- 350 PSI WHP TAG UP AND VERIFY BOTH MVI / MV2 _ CLOSED. 14,320.00 POST -VALVE CREW GREASED TREE PERFORM LTT TO 3500# ON MVI. GOOD TEST. PERFORM LTT TO 3500# ON MV2. GOOD TEST. CIRCULATE REMAINING DIESEL OUT OF COIL. FLUSH WITH FRESHWATER. BLOW STACK DOWN WITH AIR LAY DOWN BHA, REMOVE FLOATS OUT OF UQC FOR NEXT WELL STAB ON WITH NOZZLE, JET STACK BEGIN BLOWING DOWN RIG LINES. 14,320.00 POST CONTINUE WITH RD OPS. NIPPLING DOWN BOPE AND MANAGED PRESSURE LINE NIPPLE UP TREE CAP. FILLTREEWITH METHANOL. LTT TO 3500# ""RIG RELEASED AT 02:30 Printed 7/11/2619 10.16:42AM "Ali dephs reported in Drillers Depths" T/1/0=200/0/0. (Post CDR2). Set 4" H TWC @135" w/ Lubricator 839. RD CDR2 Tree and Target 90, RU Production tree. PT'd against TWC 350/5000 PSI (Pass). Charted and 7/1/2019 Retained. Pulled 4" H TWC @ 135". RDMO. ***Job Complete***. FWPs = 200/0/0. T/1/0=130/130/0 Assist Slickline as directed. (CTD) Pumped 1 bbl 50/50 followed by 9 bbls 7/14/2019 crude down TBG while SL brushed. ***WSR Continued on 07-15-2019*** ***WELL S/I ON ARRIVAL SWCP 4518***(ctd) SET 4 1/2" X -CATCHER @ 2902' SLM (2923' MD). PULLED ST#1 RK-DMY GLV FROM 2837' SLM (2854' MD). SET RK -S/0 IN ST#1 @ 2837' SLM (2854' MD). PULLED 4 1/2" X -CATCHER FROM 2902' SLM (2923' MD) (empty). RAN PTSA STINGER DRIFT TO DEP SLV @ 12,117' SLM. RAN 3.75" CENT & 3.50" LIB TO 12,119' SLM IMPRESSION OF DEP SLV W/SOME METAL SHAVINGS. RAN 3.79" G -RING, 4-1/2" BRUSH, 2-7/8" BRUSH TO 12,120' SLM. IN HOLE W/ PTSA. 7/14/2019 ***CONTINUE WSR TO 7/15/19*** Assist SL ***WSR Continued from 07-14-2019*** MIT TBG PASSED to 2433 psi, Max Applied Pressure=2500 psi Pressured TBG to 2495 psi with 5.7 bbls Crude. MIT -T lost 41 psi in 1 st 15 minutes and 21 psi in 2nd 15 minutes for a total of 62 psi during 30 minute test. Bled TBG to 200 psi. bled back 4 bbls crude. Hung tag 7/15/2019 on WV. SL in control of well upon departure. CV's OTG FWHP= 200/135/2 ***CONTINUE WSR FROM 7/14/19 SWCP 4518***(ctd) SET 4-1/2" NS LTP W/ PTSA a 12,118- SLM. PASSING PRESSURE TEST ON PTSA. ATTEMPT TO EQ XX -PLUG @ 12,120' SLM. MAKE 3 2.25" PUMP BAILER RUNS @ 12,120' SLM(4-1/2cups of metal shaving). PULLED 2-7/8" XX -PLUG FROM 12,120' SLM. SET 4-1/2" LOCK W/GAUGES @ 11,234' SLM (11,275' MD). RAN CHECK SET TO 11,234' SLM (11,275' MD) (NOT SHEARED). POOH W/ GAUGES. 7/15/2019 ***CONTINUE WSR TO 7/16/19*** ***CONTINUE WSR FROM 7/15/19 SWCP 4518***(ctd) PULLED 4 1/2" X -LOCK W/MEMORY GAUGES FROM 11,234' SLM (11,276' MD) RAN 4-1/2" BRUSH, 3.79" G -RING TO 11,234' SLM (11,276' MD) SET 4 1/2" X -LOCK W/FLOW SUB & MEMORY GAUGES @ 11,234' SLM (11,276' MD) RAN 4 1/2" CHECK SET TO 11,234' SLM (11,276' MD) (sheared) 7/16/2019 ***WELL LEFT S/I DSO NOTIFIED ON DEPARTURE*** 'D= a vaw oJMD DRAFT )R= BAKE RC V= 68.67 79.37 _' COND, ? ' = 33.71' 3285 D = 97'@12591'7sss HES CMTR 207d• D = 8.681' D = 12 347' TOPOFSCABLNR 3022' TBG, 12.6#, 13CR-80 VAMTOP, H 3029' bpf, D = 3.958' TOP OFTLNR 3105' 5/8' BKR WHIPSTOCK (04/18/14) 3286' 9-518- CSG, 47#, L -BO BUTT, D = 8.681" Minimum ID =1.92" @ 12322' 2-718" X 2-318" XO 412' SCAB LNR 12.80, 13CR40 VAM TOP, 1114 W .0152 bpf, ID - 3.958' C 19C SAFETYNOTES: WE -L ANGLE>700@12274"" CHRTBGILNR- MAX DOGLEG: 14.30 @ 12211"" NOTE= TBGI SCAB LNR DEPTHS -21' DEEPER THAN TALLY- 2014 FBNO-CHROME SCAB LNR"" 2671' -14-12' OTS X NP, D = 3.81K] 2672' -I9-5/8' DV FKR 261W 1-� 9-5/8' FOC I 2923' 1 -J4-1/2' OTIS XNP, C) = 3.813' 2952' 1 9-5/8' X 4-1/2' HES TNT PKR, ID -3.903' 2985' 4-12' OTS X NP, D - 3.813' 9-5/8' X 7- BKR C-2 ZXP LTP, D = 6-19- 4-12' WLEG, -19'4-1/2'WLEG, D=3.958'1 3042' 9-5/8' X 7- BKR FLEX LOCK HGR V= 6: 3055' 1-I 3106' -� 9-5/8' X 7- HES VERSA FLEX HGR D = 620' MLLOUT WINDOW (C -19C) 3285'-3303" 11149'-412' PACKOFF OVERSHOT ' 1 I I 11275' j TOPOF4-1/2"LNR 1136T 11346' 4-112' TBG, 12.6#, 13CR-85 VAMTOP, 11364' 1135T .0152 bpf, D = 3.958' 7• LNR, 268, 480 VA TOP XO TO L-80 B�-� 11364' 11364• 7- LNR, 269, L-80 BTC -M,.0383 bpf, ID 6.276' 11509' 412' NS L7P wiPTSA, D =231' (07M5119) 12164' 11388' TOP OF LNR 12199' 12199' 2-7/8• LNR, 6.54, 13cRa6 sTL, .995e bpf, 0 = z.aar 12332'L��::71=43339 PERFORATONSUMetARY Note: Refer to Production DB for historical Perf data SIZE SPF MHRVAL Opn/Sqz SHOT SW-6ff PG 2 FOR PERF S~RY- 3.063' X 1.995' BLAST JOINTSSTRADDLING PERFORATIONS -SEE PG 2 2-3/8' LNR 4.7#. 13CR-B5 HYD511..0039 bef, I =1995• 1d320 4-12' LNR, 12.8#, 13 .0152 bpf, D = 3.958" 4-12' OTS X NIR Of 3.813' 7' X 4-12' HES TNT HYD PKR D =3.856' 4-12' OTs X NP, D = 3.813' -12' FLOW THRU MEM GAUGES ON X -LO 7' X 5' FES VERSA FLEX HGR w/IT®K PBR D = 5.02" 4-12" WLEG, D = 3.958' EJ4D TT NOT LOGG® 1 5" X 4-12' XO BUSHING, 0= 3.920" Iruc n nr, u=t.a1� 3-12' X 2-78' XO. D = 2.370' 2-718' X 2-318' XO_ D = 1.920• PBTD H 15021' DATE REV BY COMMENTS DATE REV BY COMMENTS 06114!82 A -M NIIUIL COMPLETION 07/11119 JMD DRLG FO CORRECTIONS 02/17197 CTD C-19ASIDETRACK 07/1&19 MWJMD SET LTP w1PTSA S FLOW THRU MEM GAUL 03AO6100 CTD C -19B SIDETRACK 07110/19 JPK/JMD GLV CAD 07114119 05-08114 PKR 273 SIDETRACK (C -19C) 09114114 0.16 RWO 06130/19 N4;DR2 RWO PRUDHOEBAYUNR WELL: G -19C PERMIT No: s2140240 API No: 50429-20735-03 BP Exploration (Alaska) 11:.7�51iI:Slri"Y.q VAILHEAD= MCLVOY ACTUATOR= 13AKERC OKB. R = 68.67 REF E LB/ = 79.37 BF. ELEV = 33.71' KCP= 3285 Max Angle = 97' @ 12591' Datum ND= 12040 Datum TV D= 8800' SS SWELL PACKERS. ID=1.995" NO DEPTH 16 12323' 15 12338' 14 12535' 13 12550' 12 12863' 11 12878' 10 13139' 9 13154 8 13362 7 13377' 6 13575' 5 13590' 4 13802' 3 13817 2 14229 1 14244 BLAST JTS. 3.063" X 1.995' NO DEPTH 7 12353'- 12510' 6 12617'- 12832' 5 12918'- 13114' 4 13201'- 13338' 3 13413'- 13550' 2 13625'- 13782' 1 13979'- 14135' PERFORATION SLAWARY REF LOGS: M/VU ON 05/02114 ANGLEATTOP PEZF: 77 -@12378 - Note 7"@12378'Note: Refer to Production DB for historical cert data 6 12378 - 12488 O 6 12636 - 12828 O 6 12948 - 13108 O 6 13228- 13324 O 6 13444- 13540 O 6 13660 - 13780 O 6 14010 - 14130 0 6 14500 - 14530 C 6 14530 - 14560 C 6 14560 - 14590 C 6 14590 - 14620 C 6 14620 - 14650 C 6 14650 - 14680 C 6 14680 - 14710 C 6 14715 - 15015 C C 19C SAFETYNOTES: WELL ANGLE>70"@12274"" CHR TBGILNR— MAX DOGLEG: 14.3* @ 12211"" NOTE: TBG! SCAB LNR DEPTHS —21' DEEPER THAN TALLY- 2014 RWO —CHROME SCAB LNR— DATE REV BY COMMENTS DATE REV BY COMMENTS 06114182 A -26E INrnAL COMPLETION 07/11119 JMD DRLG HO CORRECTONS 0211797 CTD C -19A SIDETRACK 07/18/19 MWJMD SET LTP a/PTSA 8 FLOW THOU MEM GAUC 03/0600 CTD C -19B SIDETRACK 07/18/19 JPK/JMD GLV C/O 07/14/19 05/08114 PKR 273 SIDETRACK (C -19C) 9 12903 09/14114 0-16 RWO 13124' 06/30M9 N-CDR2 RWO 6 4-1/2" AICD JOINT. ID =1-995" NO DEPTH ND AICD 14 12520 13 12525 12 12847 11 12848' 10 12853 9 12903 8 13124' 7 13129 6 1334T 5 13352 4 13560 3 13565' 2 1379T 1 14219 PRUDHOE BAY UNIT WELL: G -19C PERMR No: x2140240 API No: 50-029-20735-03 BP Exploration (Alaska) THE STATE OfALASKA GOVERNOR MIKE DUNLEAVY Sean Mclaughlin Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU C -19C Permit to Drill Number: 214-024 Sundry Number: 319-215 Dear Mr. Mclaughlin: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 w-Qogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner S7� DATED this day of May, 2019. i 13WAS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.260 APR 2 4 ?fit 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ (Ptrttions shgtdoWn 0 Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing m • Other AICD / Swell Packer m Completion inside Liner 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development ®. 5. Permit to Drill Number 214-024 3. Address: P.O. Box 196612 Anchorage, AK 99519-6812 Stratigraphic ❑ Service ❑ 6. API Number: W029-20735.03-00 - 7, If perforating: Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? �13. Will planned perforations require a spacing exception? Yes ❑ No PBU C -19C 9. Property Designation (Lease Number): 1 10. Field/Pools: ADL 028305 & 028285 PRUDHOE BAY, PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (It): Total Depth TVD(ft): Effective Depth MD'. Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 15107 ' 9039 ' 1 1 8311 1 2320 14320 14640,14886 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" x 30" 48-128 48-128 Surface 2652 13-3/8" 48 - 2700 48-2699 5380 2670 Intermediate 1 3239 9-5/8" 46-3285 46- 81!870 8 4760 Liner 8404 7" 3105-11609 3103 - 8444 7240 5410 Liner 12084 4-1/2" 3022- 5106 3020-9039 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 13660- 15015 9037 - 9038 4-12" 12.6# 13Cr80 43-3050 Peckers and SSSV Type: 4-1r2` HES TNT Packer Packers and SSSV MD (ft) and TVD (ft): 2973 / 2971 No SSSV Installed No SSSV Installed 12. Attachments'. Proposal Summary m Wellbore Schematic m 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch m Exploratory ❑ Stratigraphic ❑ Development m Service ❑ 14. Estimated Date for Commencing Operations: June 1, 2019 15. Well Status after proposed work: Oil m - WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is We and the procedure approved herein will not Contact Name: Hyatt, Trevor be deviated from without prior written approval. Contact Email: Trevor.HyaOabp.com Authorized Name: Mclaughlin, Sean M Contact Phone: +1 907 564 4627 Authorized Title: En "neenng Team Lead - CTD �J Authorized Signature: v,/�t Date: COMMISSION USE ONLY i Conditions of approval: Notify Commission so—that a representative may witness Sundry Number: ^ 1 T I r Plug Integrity EI BOP Test GYtaMechanical Integrity Test ❑ Location Clearance ❑!/� Other: go PE T ESZ TD 3 So O f, 5 I Post Initial Injection MIT Req'd? Yes ❑ No 13 Spacing Exception Required? Yes ❑ No IS Subsequent Form Required: I6„y V a! APPROVED BYTHE 7 Approved 1&—Z' COMMISSIONER COMMISSION Date: -5(L !/ q1�\O ORIGINAL RBD1V1 ►��I^'MAY062019 t-C--R.T44iPRASubmit Form and Form 10-403 Revised 0412017 Approved application is valid for 12 months from the date of approval. Att hments in Duplicate .elm ,�' To: Alaska Oil & Gas Conservation Commission pFrom: Trevor Hyatt �j�� CTD Engineer Date: April 23, 2019 Re: C -19C Sundry Approval Request Sundry approval is requested to re -complete C -19C with new perforations and Automated Inflow Control Device (AICD)/Swell packer completion inside the 4-1/2" Liner. History of C -19C: C-19 was initially produced in August 1983, as a 21P and 14P producer, but went to high GOR rapidly and by late 1987 was only producing for limited amounts of time. C -19A is a horizontal zone 1 producer which was drilled with the CTD unit in March 1997. C -19B is a horizontal well drilled in March 2000. The horizontal portion of the wellbore passes through Zone 1B and extends into Zone 1A. C -19C was drilled in 2014, targeting zone 2A with a staged add perf strategy. Currently gas coning into perfs is resulting in uncompetitive high GOR production. Proposed plan for C -19C: The C -19C workover will be performed by Nabors CDR2 on or around June 15th, 2019. The plan is to perforate -650' of 4- 1/4" production liner and run a 2-7/8" x 2-3/8" AICD/Swell Packer liner inside the liner. This completion will straddle perforation zones with AICDs and swell packers. This retrofit liner is designed to automatically regulate gas production by perf interval or zone. The following describes the work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current well and proposed workover is attached for reference. Pre -Rig Work (scheduled to begin June 1st, 2019) 1. 1 V I Pre -CTD Tree work and pad prep Rig Work (scheduled to begin June 15th, 2019) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP: 2320psi) 2.Lit 2. Perforate "650' MD with 2-7/8" perf guns, 6 SPF, random, 60° phasing 3. Perform 4-1/2" liner clean out run 4. Run 2-7/8" x 2-3/8" 13Cr, AICD/Swell Packer liner inside 4-1/2" liner existing CIBP 5. Freeze protect well to a min 2,200' TVDss. 6. Close in tree, RDMO. Post -Rig Work: 1. V: Valve & tree work 2. S: Set 45KB + PTSA LTP, install generic GLVs 3. T: Portable test separator flowback. LM ,.m %G®GGL Trevor Hyatt CC: Well File CTD Engineer Joe Lastufka 564-4627 WELLHEAD= MCEVOY ACTUATOR= BAKERC OKB. ELEi-=-68 67 REF ELEV = 79.37 BF. E LEV = 33.71' KOP= 3285' Max Angle = Datum MD= 97° @ 12591' 12040 Datum ND= 8800' SS C -19 C [LTALLY-2014RWO- -14-1/2* ES: WELL ANGLE> 70° 12274" R "" MAX DOGLEG: 14.31 @ 12211— U 2211' ^' SCAB LNR DEPTHS -21' DEEPER THAN CONDUCTOR ? (i 0T6X NIP, 1) 9.58' HESCUM 2074' 13-3f8' CSG, 72#, L-80 BUTT. ID= 12.347" I—L 2686' Minimum ID = 3.725" @ 11346' 4-112" OTIS XN NIPPLE r01/2- 12.6#, 13CR-80 VAM TOP, 3029' .0152 bpf, D = 3.958' TOP OF SCAB LNR —F 3p22' 19-58' CSG, 47#, L-80 BUTT, D = 8.681- 1 4-1/2" SCAB LNR, 12.6#, 13CR-80 VAM TOP, .0152 bpf, D= 3.958' 4-12• Tum4G STLB (09/04/14) - 4-12' TBG, 12.6#, 13CR-85 VAM TOP, .0152 bpf, D = 3.958" U. 1-80 VAM TOPXO TO L-80 BTGM L-80 BTOM..0383 b0f. D 6276' 14 1 1114W I PERFORATION SUMMARY REF LOGS: MWD ON 05AW14 ANGLE AT TOP P92F: 90" @ 14010' Wta: %far W Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 2-78" 6 13660-13780 O 11/10/15 07131/15 JTGJMD SET OBR'ADPIERFS 2-78" 6 14010 - 14130 O 07/07/15 2-78" 6 14500 - 14530 C 10/09/14 2-78' 6 14530 - 14560 C 1088/14 2-78' 6 14560-14590 C 10/06/14 2-7/8" 6 14590 - 14620 C 10/07/14 2-78' 6 14620 - 14650 C 10/07/14 2-78" 6 14650 - 14680 C 10Po6/14 2-78'6 14680 - 14710 C 10/05/14 2-78' 6 14715 - 15015 C 05/05/14 Em 4-111 LNR 12.6#, 13CR-80 VAM TOP, 1—{ 15106' .0152 bpf. D = 3.958' 2672' 119-5/8• DV PKR 2688' 9-58• FOC GAS LFT MANDRELS ST No TVD DEV I TYPE VLV LATI 1 3055' 1-17- X 4-12" XO FIN, D = 3.89" 3105' 9-58" X T HES V ERSA FLEX HGF b LLOUT WINDOW (C -19C) 3285'-3303- 1114W 1--14-12" RACKOFF OVERSHOT 11210' 4-12'0TI9XNP,D=3.813• 11275' 1-14-1/2' OTIS X NP, D = 3.813- 11346' 4-1/7 OTIS XN NP, D = 3.725' 1135T 7' X 5' HES VERSA FLEX HGR w /TACK PBR D = 5.02- 11386* 15' X 4-12" XO BISHNG, D = 3.920' 1 12680' 4-1/2'PUP JOINT w/RA TAG, D=3.958' 14339' 4-12- RLP JOINT w / RA TAG, D = 3.95W 14320'4-1/2' WFDCBP(11/10/15) 14640' 1-14-12- WFD WW (SFECl4L CLEARANCE) (07107/15), PLUG MOV®; RETAGGED1189/15 14866' FISH- MILLED OUT SHOE TRACT (LWR' LND 8 FLOAT COLLAR 8 CBP (10101/14) PBTD 16021' DATE REV BY COMYETS DATE REV BY COMMENTS 66114182 A -26E INITIAL COMPLETION 08/28/15 DLHJMD GLV GO (08/09115) 02117/97 CTDC-19A SIDETRACK 11/10/15 JTCIJMD CORRECTED WFD PLUG 0386100 CTDC-19BSIDETRACK 12/03/15 JTCITLH 19T PLUG DEPTH UPDATE (11/9115) 05108/14 PKR273 SIDETRACK(C.19C) 12/03/15 JraTLH 2ND PLUG SETIPERFS(11/10115) 09(1,V14 D-16 RWO 09/11/18 JNJJMD ADDIS) OKB, REF, BF B ADFERFS 07131/15 JTGJMD SET OBR'ADPIERFS 01/02/19 GIB/JGLV d0 (UrM18) PRUDHOE BAY LUT WELL: C -19C PGRMT No: "2140240 API No: 50029-2073503 SEC 19, T71 N, RI 4F- 664' FW 81521' FEL BP Uploration (Alaska) PROPOSED 4 C M/1/16" WELLHFAD= Mce/ov ACTUAR= TO BAKERC H OKB. EV = 68.62' REF ELEV = 79.37 F. H BEV = 33.71' KOP= 3285' Max Angle = 97' 0 12591' Datum MD= 12040 Datum TVD = 8800'SS _"CONDUCTOR D= ' 9 -"'HES CMTR 'D 563, D = 8.681 BUTT D = 12 347 1 2074' 1 TBG, 12.6#, 13CI480 VAM TOP, I—� 3029, bpf, D = 3.958" ITOPOF7"LNR -4 3105' i 9-5/8" CSG, 47#, L-80 BUR, D= 8.681" �- Minimum 4-1/2" SCAB LNR 12.6#, 13CR-80 VAM TOP, - .0152 bpf, D = 3.958" 14-1/2- TUBING STUB (09/04/14) - 4-1/2" TBG, 12.6#, 13 .0152 bpf, D = 3.958" LNR 26#, L-80 BTC -M, .0383 bpf. D 6276• I--� 11509' LNR, TOP OF LNR 12175' ID= " H 12332' PERFORATION SL UARY Nbte: Refer to Production DB for historical pert data SIZE I SPF I INTERVAL I OprJSgz I SHOT SOZ -SEE PG 2 FOR PER= SUMMARY - D= D = 3.958" C -19 C SAFETY NOTES: WELL ANGLE> 70'0 12274' "^" CHR TBGILNR— MAX DOGLEG: 14.3° 0 12211' """ NOTE T9G/ SCAB LNR DEPTHS -21' DEEPER THAN TALLY- 2014 RWO """ 2571' -� 41/2" OTIS X NP, D= 3.013" 2572' I,9-58"_DV PCR 2688' —_i - FOC GAS LFT MANDRELS 2923' -141/2'OTIS X NP, 1)=3 -813- 2"T ---j 9-5/8- .813"2952' I9-5/8' X 41/2' HES TNT PCR D =3.903' 2985 41/2" OTIS X NP, D= 3.813' 3022' 19-5/8" X 7- BKR C-2 ZXP LTR, D = 6-19" iiiVj-� 4-112' WIEG, D = 3.958" 3042 9-5-8"X7" BKR FLEX LOCK HGR D = 621^ 5' H 9.58" X 7" HES VERSA FLEX HGR D= 620' MLLOUT WINDOW (C -19C) 32BV -3303" 4-112" PACKOFF OVBTSHOT 4-1/2"OTISX NP, D=3.813" �- T X 41/2" HEs TNT HYD PKR D=3.856' 7'X S HES VERSA FLEX HGR w /fIEBK P R. D= 5.07 1233 12-7/8" X 2-3/8' XO, D= ' 241!Jiw/RAG80D= 3.958^ 14339' 41/2^PIPJTw/RA TAG. D=3.958" mmmfF , NY DATE REV BY COMMENTS DATE REV BY COMMENTS 06114162 A -26E INTIAL COMPLETION 04104119 JMD BIILT PROPOSED 02/17197 CTDC-19ASIDETRACK 0386100 CTDC-19BSIDETRACK 05108114 PKR273 SIDETRACK (C -19C) 09114114 D-16 RWO RWO PTLOiDE BAY LINT WELL: C -19C PERMIT Nr. #2140240 AP No: 50-029-2073503 SEC 19, T11N, R14E, 664' FPL & 1521' FEL BP Brploratlon (Alaska) TREE= 4-1/16' CNY WELLHEAD = MCEVOY ACTUATOR= BAKERC OKB. ELEV = 68.67 RB` ELEV = 79.37 BE ELEV = 33.71' KOP= 3285' Max Angle = 97'@12591' Dawn MD= 12040 j=TVD= 8800'SS SWELL PACKERS, ID= " NO DEPTH 16 12333' 15 12348' 14 12530' 13 12545' 12 1286T 11 12887 10 13154' 9 13169 8 13361' 7 13376' 6 13573' 5 13588' 4 13820' 3 13835 2 14207 1 1421T PERFORATION SLWAMRY REF LOGS: MAID ON 05/02/14 ANGLE AT TOP FEff. 90" @ 14010' Note: Refer to Production DB for historical perf data SEE SPE INTERVAL Opn/Sqz SHOT SOZ 2-7/8" 6 13660- 13780 O 11/10/15 03/06100 2-7/8" 6 14010-14130 O 07/07/15 SIDETRACK(C-19C) 2-7/8" 6 14500 - 14530 C 10/09/14 I I 2-7/8" 6 14530 - 14560 C 10/08/14 2-7/8" 6 14560- 14590 C 10/08/14 2-7/8" 6 14590- 14620 C 10/07/14 2-7/8" 6 14620- 14650 C 10/07/14 2-7/8" 6 14650- 14680 C 10/06114 2-7/8" 6 14680- 14710 C 10/05/14 2-7/8"l 6 114715- 150151 C 05/05/14 C-1 9 C SAFETY NOTES: WELL ANGLE> 70'@ 12274' - CHR TBGILNR— MAX DOGLEG: 14.3° @ 12211"" NOTE: TBG! SCAB LNR DEPTHS -21' DEEPER THAN TALLY- 2014 RIND DATE REV BY CONVENTS DATE REV BY OOMMEWS 06114/82 A -26E INITIAL COMPLETION 04/04/19 JND BULT PROPOSED 02117/97 CTD C -19A SIDETRACK 03/06100 CTD C-198 SIDETRACK 05108114 PKRZ73 SIDETRACK(C-19C) 09114/14 D-16 RING I I RING 4-12" AICD JOINT, ID = _" ND I DEPTH I ND. AICD 28 12515' 27 12520' 26 12565' 25 12570' 24 12575' 23 12580' 22 12902' 21 12907' 20 12912' 19 13129 18 13134' 17 13139' 16 13144' 15 13189 14 13194' 13 13351' 12 13396' 11 13401' 10 13556' 9 13563' 8 13608' 7 13613' 6 13800' 5 1380.5' 4 13855' 3 13860' 2 14187' 1 14192' PRLDHOE BAY UNT WELL- C -19C PEI;MT No: 2140240 AR No: 50-02320735-03 SEC 19, T11 N R14F:. 664' FNL & 1521' FEL BP Exploration (Alaska) Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21-NOV-17 Quick Test Sub to Otis 1.1 ft — — ...... Top of 7" Otis O.Oft .—.—.—.—.——.—._._._- CORY Rig's Drip Pan Distances from top of riser Excluding quick-test sub 4 7-1116" 6k Flange x T' Otis Box Top of Annular 6.0 ft dril7111 Top of Annular Element 6.7 ft Annular Bottom Annular 8.0 ft_7 C6 Blind/Shears 9.3 ft CL 2-318" Pipe/Slips 10.1 h B1 e2 ea sa Choke Line L�C Kill Line CL 2-3/8" x 3112" VBRS 12.6 ft CL 2-3/8" PipelSlips 13.4 k CL of Top Swab CL of Flow Cross CL of Master LDS LDS Ground Level 0 16.0 ft le T1 or T2 Master Hose BP EXPLORATION (ALASKA) INC., PRUDHOE BAY UNIT C -19C (214-024) PRUDHOE BAY, PRUDHOE OIL Monthly Production Rates 10,000,000 1,000,000 r 0 CL 100,000 LL U O _ y„ N o 10,000 m _ w O O m a (7 LL C 1,000 u 3 u h 100 7 O t H 10 r n WINE a��•����a���We C...■�ri��l����ri'n�J�ai�i� e_r W�i� moi= i 10,000,000 W v 1,000,000 N 0 0 100,000 0 3 S 10,000 0 W d 1,000 �— O m m 100 m O 3 10 S SPREADSH EET_2140240_PBU_C-19C_Prod-I nject_Cu"es_W ell_Oil_V120_20190429.xlsx 4/29/2019 Jan -2010 Jan -2011 Jan -2012 Jan -2013 Jan -2014 Jan -2015 Jan -2016 Jan -2017 Jan -2018 Jan -2019 Jan -2020 � Produced Gas (MCFM) . GOR —. Produced Water (BOPM) � Produced Oil (BOPM) SPREADSH EET_2140240_PBU_C-19C_Prod-I nject_Cu"es_W ell_Oil_V120_20190429.xlsx 4/29/2019 Carlisle, Samantha J (DOA) From: Rixse, Melvin G (DOA) Sent: Wednesday, April 24, 2019 1:38 PM To: Carlisle, Samantha 1 (DOA) Subject: FW: Cancel sundry #318-393 for C-1 9C (P(TD #214-024) FYI. Mel From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Wednesday, April 24, 2019 1:11 PM To: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov> Cc: Hyatt, Trevor <Trevor.Hyatt@bp.com> Subject: Cancel sundry #318-393 for C -19C (P(TD #214-024) Mel, Please cancel / withdraw sundry #318-393 for C -19C (PTD #214-024). We will be replacing with a like sundry today. Please let me know if you have any questions. Thanks! Thank you, Joe Lastufka SIM Specialist Cell: (907) 227-8496 1 Office: (907) 564-4091 �°`'" $u bsurfare fL Wells BP Exploration Alaska 900 E. Benson Blvd Room: 717B I Anchorage, AK RBDMSZAA/,PH z 5 zo19 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N • REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations H Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate H Other Stimulate 0 Alter Casing ❑ Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well ❑ Re-enter Susp Well 0 Other: 5C t C148 P � V7L. 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-024 3. Address: P.O.Box 196612 Anchorage, Development H Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20735-03-00 7. Property Designation(Lease Number): ADL 0028305 8. Well Name and Number: PBU C-19C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 15107 feet Plugs measured 14320 feet RECEIVED d/ true vertical 9039 feet Junk measured 14640/14866 feet Effective Depth: measured 14320 feet Packer measured See Attachment feet DEC 10 2015 true vertical 9046 feet Packer true vertical See Attachment feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 111 20"91.5#H-40 34-145 34-145 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate Production 3253 9-5/8"47#L-80 32-3285 32-3281 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 32-3029 32-3027 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: E0h [, 04L U tF 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 68 4330 5 1450 261 Subsequent to operation: 735 5449 88 1060 277 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations H Exploratory ❑ Development H Service 0 Stratigraphic El Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil H Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP ❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature RI,�''„„� � - (2� Phone +19075644424 Date 12/10/15 Form 10-404 Revised 5/2015'"''"' vT i. i ]2✓`/s )i RBDMS DEC 1.51Q15 Submit Original Only fit' i2/ �.- • • Packers and SSV's Attachment PBU C-19C SW Name Type MD TVD Depscription C-19C TBG PACKER 2952 2950.69 4-1/2" HES TNT Perm Packer C-19C PACKER 3022 3020.44 7" Baker ZXP Packer C-19C TBG PACKER 11240 8224.25 4-1/2" HES TNT Perm Packer • • Q,o CD CD o CD o o CD co CO 0- a) CD o o p N V I- LO N- r- 4,U W o o C7 CO 0 0 0 0 i O) 0- 01 0- 0, co M CO C)) cc Cr N V CO CO co N- co 00 u0 0- le — CO co-) I. • CO 00 CO CC) d oo N O CO N 7 O CO N N M 00 00 C)) M 1 1 1 1 1 [ 1 1 H N- 00 O ✓ 01) 00 N N O N CV 00 M O Ch O 00 C7 N M M 00 a) Cf) 00 Cf) CD CD O N r CD CO O Cfl tf) `- ON N N 01 14) M V • U < rn N- 0) U) rszr Com) a0 N N CO 00 N CO I M 00 CO C`) CO 00 c U N r) r) m CD CD CD CD0o000oco0 UU � J J M M co CO ev *k N *k J *k *k Cl) N ' N CO 4 CO CO 03N - N � N N U o c cc '— N r C7 o) CV N CV N r r Nir r. Cr) O V CD N- Cf) O in N C V CA C C) N 't N- 0) CU `� N CO M CO CO C'7 N OC Z C O H w w U O 0 a s Z Z c D O w w w m O D D W ZZ Z_ D O U) U) 0- J J J k- • • w N m CO LU d' CO Ln N CO C) 6) 00 C) cr C) OO OO V- O N 00 O . C) c- M C) C) LI) O Q. M le 00 co In r- O O N Ln C) C) N- o O C) 01 O cr V d' 4- A d' co co co ch co co ❑ O) O O O) 0 0 0 0 0 0 0 0 0 0 0 0 ❑ O O 6) 6) 6) 6) 6) 67 6) 6) 6) 6) 6) I- CL 0 I- ' L (O 4- N CO O 00 r 00 O) d' r N- s CO CO t 6) N (Y) 6) . M . C') M 6) (0 Q N- 00 c- co tC) OO 6 L•- l() C7 C7 co0 co (Y) co co d' 't d' d' 4- �t d' co co 00 C) m W ❑ 0 c) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6) O 6) 6) 6) 6) 6) 6) O 67 6) O 6) 67 6) O 0 I- w wcc o w . o o z W w 0 a.W 0 a) Y U 00 > O CO W Y Y- in 2 .c 0 C) CD C) CD CD 0 C) 0 CD CD 0 0 0 0 LO - - J 0 V w w w 6) N Lf) CO N- O co C) (0 6) N LU OO J J -J Q EL Cn Y •W Q O N- N- N- O O c- LC) Ln 10 C6 O Co N- o < Q Q w Cl- 0 z C 8 co co co co d' d' V d' V d' 4- V cr d' Ln U_ _0 U_ J W W 0 J 0 y z z z 0 o 0 0_ 0 0_ m 2 c) =0 m0 z ❑ ❑ Z ~ V 0 2 2 0 cn co vai O C/) +- 0) Q0. U0 = r O O CD O O O O CD CD O CD O O O O Ln p. CO 6) N Lc) c- cr I"- O O C) CO CD N Ln OO A- C) - Om ❑ M co co) co V d' d' V' d- V d' d' V d' V caac L a) cn cc ` � � 2 0l~nco 0_ _1 a) O. 0 0 0 c O LL LL LL LL LL LL LL LL co U) co Cl) Cl) Cl) Cl) Cl) fs' ctaaaaa0_ aaaaa0. aa0_ a`> Q Q Q Q Q Q Q Q m no co no m no no m a 0 t a) 0 d H fa LO Lc) LU LU „ up LC) up in in L() LC) Lc) l() LC) Ln Ci A- 0 0 0 ' CD O O O CD O O O a J z O O O O N CV N N N N N N LL O N N N N N N N N � � � � � � � � Z g Q 0 0 0 0 0 0 0 O O Y 1 W V N L.L. _ _ �_ - - -. — - IL W :.� J .LJ W Q' 0. c- c- c- I� r r Q 0 J _ H J JDJ D 0' 0_ r r T- O m ciD w J J 3 .7:Z OW W Q Q 0_ 7] cn LL LL n LL Ln 0_ IY a) E m 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6) C7) 6) 6) 63 6) 6) 6) 6) O 63 C) 6) 6) 67 6) LL 0_ (T) 0 W N 0_' LL I I I I i I I I I I I i m 0_ 0_ 0_ 0 J 0 0 w 0_ U U U U V U U U U U U U U U U U < < m m LL LL cn co 0_ IY • • 0 N © -0 N C _ V N > co �' rn co N o CD oN co _ - O O o E ••L O C > ---I 'C c c c .c co O cu C O c j r O p xY1 O N 0 a) � -j O 7 t 0 w � EOM N m aa)iCD � o � a � 0 � cOJQ 6) Qo aio oa - y a2N oO a) w mrn 4- a) d O io o 2 E ° 0cn0 _v c—cu o u) co . Ch 09 � O a " o L > Z 7 a) a O NO O Q - QQ Q cr ui 2 `tdtl 0 o_ m � o •mE `asN4- O ._� U - o omOo cu I. aim v a ° o — o = o O cu - _o U v o - U - c2o rn o U E CO 0 o LO CO S 2 a) 3 c ° Z , - 3 `t o'- p 3 3 m °° `t o_ bo Q Ni • 0 c `l' 3 a) E 0 J O m a)U E ° H o N +Z.� N cnco ° Q _c ,._c C om - O oao3m � odM _o +- Eu' m U U p to' N c in c E O d N cn �' _ *� O O O C c 0 c) N .0 o § N a) N -_,=,c U 10 0 C C ? J O - > g ' m a o o co = 0 o O c c U o o Q o 8f- cna ,_ in OCC a) CL wU ° ate cn c Z v°i rn � .c U :' . 0 t .2 • o `t W > .` " _ Lt LL o C cn co co - ns c o a)`t o 0 'S Q`t o °' a) � O Q S O N � � ns CB 3 0 � a) .;I- Q a) J 0O a) a) co m -iii _o N r O ° Or N -O C ° p N -a)Cl_ a co +; C d Q t O w co W N N to • N-- N N co , rn N co c c O N0000- (vi v 4 Q • m -. O° o ° rn cnn -°6 2 O ° E O CO p ° N N m +� o N p o o n -0 o 0 o a) .tea M o o+ aci T E ° L O H O _N J a) O C N_ J -0 rn� 45 r N J a Y ,_ O Q Q) 0. 2 Ey)a o cu -0 ai o E o o -0 ai 73 2 • o o -0 ai ° - a) c .� a) 'L -- 0 c.) 80) 0- Qo� Q040 Qo� E O � oO� oM• � a03 � oca a) %— co coE aimo � � Q aiin .'7Qo ° o a$ ci) '= N - o Cf) a ' .1.) 0- aEaa '� o F 3 rnFDX �>- �ooa aai a) > o > o 'C a) Ua O °t CO t o o w m vi o C° = }c. o -.' ai cn c Lo m as N co c c > co a) a a `oXc�U '<oo co oa a�iMo '5 a) c°i O aiow � a .NM O io 2 r 2 > >, o 0_ co o a° o CL r a) a) Q CO m M • a) D cn 0. m 2 = O O co -a co .E E °-o1:1 o O c c o)M• r , ,. O G> > 'i O d O) r a) > U u) N r a) O O _ co r N O)O ' O - > X z Ce V a a U O N L 0 ,- s- f` O •0) X O ' Q Q >, a) - I— � C La v = a -C v ° MO ss (L) co v D c2p _ in Q m _c II ° U -0 o II Urso c,=. `= n Mr m ma ' : .� O � N. d o N cF- a) �� M CN4_ o- ° — co 32r � - C c �C E V) * )0 ° = O c r o o *k O "O N a) O oII 0- 0 m a) 0 ° � oLo >,� > c O .c L *k . > c c cn a) � . > c ° ao > O EUS vi Imo ° � c 0 -0 3 a��i �j -0 I) ami E L cu 0 -°° (� ocr) aa)) U -a i 0 $? - >, °-� c°o rn ° c}o t) p)= O C L f6 3 L _ = N Y - .t 't O M c 7 L7 O (6 C a N 0 0 lf) co OOO r a) Orn co O N O-U o CO Q cn Q u) CO ra i f) >2 -) OD O O I- L f• > co - 2N- - O c >� c (o c QL O` �•- C > 0 d r M • Z r co Qr a) a) > N m. Q °--c O �� co C 0) ° t c O 7 co c r 7 p Y O C _ o a) a) O 4 co *# N O a) ` -C O *k C - 2 O C -) 'C a) } oo - a) —, m m a) E C� o D 2 a-.= o o- oma) c rn c D c o = v Y ; UUuu)) 3 - u°)) w : U .s3 �c°O\I0_H . U .s - cf°i0E . ? ~ SOo ° ~ O ° co � U ._ U � C� U U �. � n t. w i- <an in in in to r r r ,-- r > O O o O N N N N � C° o N r r H r r r r ,- 1.- 0 U Q 0 . c 2 > 2 0 u/ } .c 7 f \ C. \ o / p g E _ / � / / _/ § \� Lc) c 73 (n0 r & 7 / 22e o / ( E ° Q O = 5 $ J \ ± GoO I - o0 \ / / \ f ° E o / cm E .c o.\ \ k - I 'E = g G .$ Cl) 2 U_ •) 2 e 5 C 99 ® = © f ./ f 0 7@ e $ a E IP cti _ © / § f 2 \ $ E o I- 2 y f £ o o z e = e @ 0. 22 = a � � = coI- ) \ a - a 3 5 f f a -- e . 0) C .\� \ £ § k /� k LI o E / Cl) Z k Cl) R = 2 o -a) a-% / ¢ § CO > E _ o � � � � C alk § 7 / CL _a o ± 2 c _ D ( •m J _o \ e o n 2 2 5 \ / / / 22 = % y t - [ � \ \ � . \ \ o - \ § al c O _, e co ii ii e g o o 2 2 \ / % \ f \ / ca 8 2 E - co 0 0 - m o > f & 3 /© $ a 2 \ ± ° 5 = / 0 » (N \ k / % o 5 k 0- \ ® 2 f § / E U £ C) E / •- - wo . UQ � � = E % ao = 2 § 2cw0 c R f \ ° e I D 0 C a .%2 .2 cp 0 < o 2 : 0 cC .R . o Et @ e r r \ / nor ^ d \ / /16 1116 LwaLl-ACTUAAD= 418 EOY • C-19C NOTES:„,MwELAX LL ANLLCPR 14.3° 12211''*' bKB.ELEV= 68.60' NOTE:TBGI LNR DEPTHS-21'DEEPER THAN BF.ELEV= 33,82 -"CONDUCTOR H ? : ; STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMM!. N REPORT OF SUNDRY WELL OPERATIONS 1 Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate H Other Stimulate 0 Alter Casing 0 Change Approved Program ❑ ` Plug for Redrill 0 Perforate New Pool El3 Repair Well ❑ Re-enter Susp Well ❑ Other C I p Id 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Dnll Number 214-024 3. Address: P.O.Box 196612 Anchorage, , Development II Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20735-03-00 7. Property Designation(Lease Number): ADL 0028305 8. Well Name and Number PBU C-19C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL ,��.,.�� 11.Present Well Condition Summary: 4"'S 1`"'rR,_ 4 12 Total Depth' measured 15107 feet Plugs measured 14403 feet ry true vertical 9039 feet Junk measured 14866 feet AUG v 0 3 Lib Effective Depth: measured 14403 feet Packer measured See Attachment feet true vertical 9041 feet Packer true vertical See Attachment feet /\O(.. C Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 111 20"91.5#H-40 34-145 34-145 1490 470 Surface 2054 9-5/8"47#L-80 33-2087 33-2087 6870 4760 Surface 601 13-3/8"72#L-80 2087-2688 2087-2687 4930 2670 Production 3253 9-5/8"47#L-80 32-3285 32-3281 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet ;C,HNNEICI Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 32-3029 32-3027 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 641 44685 56 0 979 Subsequent to operation: 20 2123 ' 2 0 251 14 Attachments'(required per 20 AAC 25 070 25 071,&25 283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development IA Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil H Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG ❑ GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C.O.Exempt: N/A Contact Summerhays,Nita M( 'RO Technologies) Email Nita.Summerhays@bp.com Printed Name Summerhays,Nita M IPRO Technologies) Title Petrotechnical Data Engineer Signatur- i/4 plr,/K40 4.,e, I/ // Phone +1 907-564-4035 Date 08/03/2015 � �I Form 10-404 Revised 5/2015 V n_ R/z./../5- Subm genal Only f7 --- RBDMS AUG 1 4 2015 Daily Report of Well Operations PBU C-19C ACTIVITYDATE SUMMARY CTU 9 1.75"coil CV=45.6bbI Standby while C-19 gets rigged up. Unit 9 unable to go to maint due to other units not finished yet. 7/4/2015 Were able to EWR this job. Coil 9 1.75" coil CV=45.4bbl Objective: Set special clearance CIBP and Perf MIRU. MU PDS mem gr/ccl inside 2.875" carrier+3.70 DJSN and rih. Load well with 225 bbls of 1%KCL w/safelube. RIH and tag down at 14,803', got wt back at 14,792'. Log up at 50 fpm from 14792'to 12500'. Paint red flag at 14451'. POOH. Phoned APE, decision agreed upon to tie into Coil flag log dated 06-Oct-2014. MU WFT 4-1/2" special clearance WRP (OD=3.69"). RIH, correct depth at flag and set WRP at 14,405'. POOH. MU gun#1 30'2.88" PJ HMX gun. RIH w/choke closed. Test CIBP to 1000psi while rih. Open choke/take returns, continue to rih. 7/5/2015 ""Job Continued**" Coil 9 1.75"coil CV=45.4bbl Objective: Set Special Clearance CIBP and perforate Continue RIH w/gun#1 taking returns to OTT. Circulate 1/2" alluminum ball and Perforate 14100- 14130 w/2.88" PJ HMX gun. POOH. Pump 11 bbl 50/50 meth cap while pooh. Cut 125' of pipe for 13CR management. MU WFD MHA w/2.88" x 30' perf gun#2. RIH and correct depth off WRP. PUH and perforate interval from 14070-14100'. POOH. MU/RIH w/gun #3. 7/6/2015 ***Job Continued*** Coil 9 1.75"coil CV=45.1bbl Objective: Set Special Clearance CIBP and perforate Continue RIH w/gun#3. Perforate 14040-14070 w/30' 2.88" PJ HMX 6spf. POOH. MU 2.88" x 30' perf gun #4. RIH and correct depth off WRP. PUH and perforate interval from 14010-14040'. POOH. Freeze protect well with 50/50 McOH to 2100'. RDMO 7/7/2015 ***Job complete**" Fluids Summary BBLS Type 522 1% SLICK KCL W/SAFELUBE 42 50/50 METH 151 1% KCL W/SAFELUBE 715 Total a) N t0 CO N CO O O Co O) c 00 L O) N cM O M co M O) Ln LO n, M Lf) I- o O 0 N- In Co CO f� y c c c "Zr "Cr CO CO CO CO CO CO CI 0 0 0 0 0) 0 0 0 0 0 0 0 0) O) O) O) 0) 0) 0) 0) 0) O) 0) > 0 F" 'Cr N CO O) CO CO O) c N V 0) N CO O) _. Co M Co 0) d M IC) O O O) N- In M M d c c c c c c co M co cM p 0 0 0 0 0 O O O O O O) O) O) O) O) O O) O) 0 O) 0) F- a a) W Y 0 W F- ct L• 0 0 0 0 0 0 0 0 0 0 0 L() J W W ▪ c N- O CO CO CO 0) N LO CO A- W J Z G O C) 10 10 Lf) CO Cr) LU N- O CC < W () J (7 _ c c c c c c c c c c 'Cr Loa a U U) Lij FW- F- < O w a W a > a' g = z cn z a P- a o o o W 0 -J a < - Q w C.) U 2 ? 2 o o o cn cn cn QU0 F- • L 0 0 0 O O O O 0 0 0 0 LO "Cr N- O O CO CO O) N LO CO O m y• O O O LL) LL) LO LL) CO Cr) CO N- 0 c c "Cr c c c c c c c c c Baa co L a) O a o o cn a 2 0 ai a) m v) m CD a 0 0 U .2 u_ LL w LL V) U) U) CO CO CO U) C/) y• Q Q Q Q m m m m m m m m a 0 a) a) a d I- pLnLn0LnLnLnLnLn �n �nLnLOLo o O C 0 0 0 0 O O O O O O O O Z W Q W 2 N N N N N N N N N N N NW N W \ \ CO CO LO LLC) LO LO L\ LO 0° C3 OW LLLI CC .1.1 LL W J_ J_ < a 0) W W W ( a, E N z000000000000 rn rn rn 0) rn a) 0) rn rn rn rn rn N W a cn O U- U U U U U U U U U U U U aN o UW d¢ Qmmu_ ticn co a s Q o 0 0 0 0 0 0 0 N- (0 oo 00 � mr` � v � �n - C N U y 0 0 0 0 0 0 0 0 I- O) N- CO N- M V CO CO CO V CO CO I- 00 CO N- N- A- O 'Cr 0) N- CO 00 CO LO V M N O O N r- 0 0 N N CO CO CO CA CO C , , , , I- N- CO O CO CO N N O N N CO CO O M O A- CO CO N M CO CO a) O N O 2 0 0 0 0 0 0 N O co N Lc) O N N M M C.) o 4-0 am N- C) LUN- r CO CO N N O co N CO CO CO o CO 0 CO = r' N CO COM I—• 0_ o 0 0 0 O O o O o L vCO CO C.) UU 13) J J J C00 O CO _ • CD 4:k *k C J4.� J N r 4# co coS •N V - - N CO N N 0D \0 N U O O O N N- N N N 6) co 0 V V V L_ • O O N V N- C) • N (D CO CO CO CO N J Z a)0 O .5)- 0• 000 Z CCQ O w w w m O D D r Z_ Z_ Z_ D U (nU) Q JH • Packers and SSV's Attachment PBU C-19C SW Name Type MD TVD Depscription C-19C PACKER 2952 2950.69 4-1/2" HES TNT Perm Packer C-19C PACKER 3022 3020.44 7" Baker ZXP Packer C-19C PACKER 11240 8224.25 4-1/2" HES TNT Perm Packer TREE „4-1/16"CM/ WELLHEAD- AK:EVOY -1 9C CHRSA i BG/LNR 6"'MAX DAPW,LE>70°fg 12274'_ DOGLEG: fg 12211'"" ACTUATOR= BAKER C NOTE TBG/SCAB LNR DEPTHS-21'DEEPER THAN OKBEI EV= 6833 8 Iv I TALLY-2014 MVO"' 33.8 EL BF. EV= 7 TOR — ? H I4 1 KOP= 3285' _#, • 1 Max Angle= 97° T, 12591' D= 4,s,• % 2571' —14-1/2"OTIS X NP,D=3.813" Datum MD= • • Datum TVD- 8800'SS 9-5/8'HES CNTtR 2074' i/ 2572' H9-5/8"w ACR 9-5/8"CSG,47#,L-80 HY D 563,D=8.681" H 2087' 9-5/8-BKR BOVVBD —{2087'-2091•V PATCH, =?" 2688' H9-518"FOC GAS LFT MANDRELS 13-318"CSG,72#,L-80 BUTT,D=12.347" —{ 2688' • ST ND TV0 DEV TYPE VLV LATCH FORT DATE 1 2854 2853 4 PLG DOW RK 16 09/21/14 Minimum ID =3.725" @ 11346' ' 4-1/2" OTIS XN NIPPLE ----( 2923' H4-1/2"OTIS X IAP,D=3.813" 4-1/2'TBG,12.6#,13CR-80 VAM TOP, 3029' 2952' 1--19-5/8"X 4-1/2"FES TNT PKR D=3.903' .0152 bpf,D=3.958' , "--------1 2985' H4-1/2"011S X NP,ID=3.813' TOP OF SCAB LNR — 3022' . TOP OF 7"LNR 3105' 3022'.j—{9-5/8"X r BKR C-2 ZXP LIP,ID=6-19" 9-5/8"BKR WHPSTOCK(04/18/14) — 3285' 3029' H4-1/2'WLEG,D=3.958' 3042' --19-518"X r BKR FLEX LOCK HGR,D=6.21" 9-5/8'CSG,47#,L-80 BUTT,D=8.681" —{ 3285' 1._.moi+ ' 3055• H r X 4-112"XO FIN,D=3.89" 1 3105' —I9-518"X 7"FES VERSA FLEX HGR,0=6.20' 1.1 NLLOUT WINDOW(C-19C) 3285'-3303" 14.1 4-1/2"SCAB LNR,12.6#,13CR-80 VAM TOP, — 11148' ,j :.; 0152 bpi,D=3.958' 11149' H4-1/2"PACKOFF OVERSHOT — 11149' 4-1/2'TUBING STUB(09/04/14) { tor 11210' H4-1/2"OTIS X NP,ID=3.813' TOP OF 4-1/2'LNR —{ 11357' 1 0i.2 11240' —7"X 4-112'HES TNT HYD PKR,D=3.856' 4-1/2"TBG,12.6#,13Ct2 85 VAM TOP, —{ 11364' ' 11275' H4-1/2"OTIS X NIP,D=3.813' .0152 bp',D=3.958" {7"UP,26#,1-80 VAM TOP XO TO L-80 BTC-M —( 11384' ' 11346' {—4-1/2"OILS XN MP,D=3.725" 17"OR 26#,L-80 BTC-M,.0383 bpf,D 6.276" —{ 11509• l 11357' —7"X 5"FES VERSA FLEX HGR PERFORATION SUMMARY w/WHACK PBR,D=5.02" REF LOGS:AMLO ON 05/02/14 11364 I--4-1/2"WLEG,ID=3.958" ANGLE AT TOP PERF: 90°©14010' amo NOT LOGGEDNote:Refer to Roduction CB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 11386' H 5'X 4.-1/2'XO BUSHING,ID=3.920' 2-78' 6 14010-14130 0 07/07/15 12680' H4-1/2'PUP JOINT w I RA TAG,113=3.958' 2-7/8" 6 14500-14530 C 10/09/14 2-718" 6 14530-14560 C 10/08/14 , 2-7/8" 6 14560-14590 C 10/08/14 14339' H4-1/2"PUP JOINT w/RA TAG,D=3.958" - 2-78" 6 14590-14620 C 10/07/14 14403' H4-1/2"WFD CEP(SPECIAL CLEARANCE)(7/7/15) 2-78" 6 14620-14650 C 10837/14 2-78" 6 14650-14680 C 10/06/14 , 14866' —FISH- LLE)OUT SHOE TRACT 2-7/8" 6 14680-14710 C 10/05/14 d r (LWP/LPD&FLOAT COLLAR&CBP(10/01/14) ♦ FWD —I 15021' •.iii. 4-1/2'LNR,12.6#,13C -80 VAM TOP, --{ 15106' 1 ----- R .0152 bpf,0=3.958" DATE REV BY COM ENTS DATE REV BY CONSAENTS PRUDHOE BAY LM'IT 06/14/82 A-26E INITIAL COMPLETION 10/01/14 RM-1/PJC WILL CBP&PUSH DH WELL: C-19C 02/17/97 CTD C-19A SIDETRACK 10/10/14 RMI-I/PJdADPERFS(10/05/14-10109/14)) PERMIT No: 2140240 03/06100 CTD C-19B SIDETRACK 10/22/14 PJC SCAB LNR CORRECTIONS API No: 50-029-20735-03 05/08/14 PKR 273 SIDETRACK(C-19C) 10/24/14 SMc/PJC FINAL ODE APPROVAL SEC 19,T11N,R14E,664'FIL&1521'FR 09/14/14 D-16 RWO 07/31/15 JTC/JMD SET CBH'ADPERFS 09/23/14 OLWIJINC GLV C/0(09/21/14) BP Exploration(Alaska)