Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-036CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:AOGCC Permitting (CED sponsored) To:Brooks, James S (OGC) Subject:FW: Cancellation: PBU K-21 (PTD #214-036) 10-403 Sundry Request #323-348 Date:Monday, April 8, 2024 8:59:37 AM Attachments:Sundry_323-348_062623.pdf Hi James, For RBDMS I have logged it in the 2023 10-403 log. Thanks, Grace Christianson Executive Assistant, Alaska Oil & Gas Conservation Commission (907) 793-1230 From: Abbie Barker <Abbie.Barker@hilcorp.com> Sent: Friday, April 5, 2024 3:25 PM To: AOGCC Permitting (CED sponsored) <aogcc.permitting@alaska.gov> Cc: Torin Roschinger <Torin.Roschinger@hilcorp.com>; Kirsty Glasheen <Kirsty.Glasheen@hilcorp.com>; Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>; PB Wells Tech Aides <PBWellsTechAides@hilcorp.com> Subject: Cancellation: PBU K-21 (PTD #214-036) 10-403 Sundry Request #323-348 Hello, Please cancel 10-403 Sundry Request #323-348 K-21 IA Cement Repair & Contingent Tubing patch (attached for reference). The team will not be pursuing this job and no reportable work was executed. If you have any questions or need additional information, please let me know. Thank you, Abbie Abbie Barker Regulatory Tech, Prudhoe Bay West Team Hilcorp North Slope Email: Abbie.Barker@hilcorp.com Cell: (907)351-2459 RBDMS JSB 040924 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU K-21 IA Cement Repair, Contingent Tbg Patch Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-036 50-029-23511-00-00 341J ADL 0028300, 0028303 12370 Conductor Surface Intermediate Production Liner 9054 80 4222 10686 1788 10337 20" 9-5/8" 7" 4-1/2" 8241 47 - 127 46 - 4268 45 - 10731 10581 - 12369 2420 47 - 127 46 - 3558 45 - 8604 8466 - 9054 None 3090 5410 7500 10337 5750 7240 8430 11930 - 12230 4-1/2" 12.6# 13Cr80 43 - 105898994 - 9034 Structural 4-1/2" HES TNT Packer 4-1/2" HES TNT Packer 10303, 8210 10467, 8361 Date: Torin Roschinger Area Operations Manager Kirsty Glasheen Kirsty.Glasheen@hilcorp.com 907.564.5258 PRUDHOE BAY 7/1/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 10/2022 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov No SSSV Installed By Grace Christianson at 2:22 pm, Jun 15, 2023 323-348 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.15 13:18:31 -08'00' Torin Roschinger (4662) * CBL log to AOGCC for approval to produce. * Passing MIT- T and MIT- IA to 2500 psi required for POP. * Bi-ennial MIT-T and MIT- IA to 2500 psi required to produce. 2420 * Variance to 20 AAC 25.200(d) approved per CO 736 allowing for cement packer squeeze. MDG 6/21/2023 DSR-6/15/23MGR22JUN23BWH 6/26/23 Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2023.06.26 11:49:14 -08'00'06/26/23 RBDMS JSB 062723 IA Cement for PC/Tbg Leak Well: K-21 Well Name:K-21 API Number:50-029-23511-00 Current Status:NotOperable Producer Rig:FB, SL, EL, Coil Estimated Start Date:July 1, 2023 Estimated Duration:7days Reg.Approval Req’d?Yes Regulatory Contact:Abbie Barker First Call Engineer:Kirsty Glasheen Contact:907-350-4310 (C) Second Call Engineer:Aras Worthington Contact:907-564-4763 (O) Current Bottom Hole Pressure (est):3300 psi @ 8800’ TVD Max. Anticipated Surface Pressure:2420 psi (Gas Column Gradient (0.1 psi/ft) to surface) Min ID:3.725” 4-1/2” OtisXN nipple at 10,572’ MD Max Angle:91 deg at 11,451’ MD History K-21 is a natural flow Ivishak producer that was SI in February 2023 after being classified as non-operable. Prior to the integrity issues, K-21 was a fulltime producer making ~400 bopd, 60 bwpd, and 25 MM scfd formation gas. A RWO was considered as a repair option; however, this was deemed uneconomic. So, an IA cement job is being pursued to return K-21 to operable status and bring the well online. K-21 failed a diagnostic warm TIFL on 01/22/23 after DHD was attempting a bleed, but the IA pressure would not bleed down. On 02/10/23, slickline set a TTP and performed a failing MIT-T and CMIT-TxIA. A subsequent LDL on 2/11/23 identified a significant tbg leak @ 6706’ MD. A follow up LDL on 2/22/23 found a PC leak at 6710’ MD. The well does not exhibit OA repressurization. Current Status Not Operable well with PC leak at 6710’ MD and tubing leak at ~6706’ MD. Objective Execute an IA cement repair to seal of the PC and tubing leaks. The proposed TOC in the IA is ~6200’ MD/4977’ TVD which is ~500’ MD above the PC leak at 6710’ MD and tubing leak @ 6706’ MD. 500’ is the general-rule minimum of cement above a PC leak needed for a reliable cement repair. The proposed TOC is ~1932’ MD/1419’ TVD below the SC shoe at 4268’ MD/3558’ TVD and ~275’ MD/203’ TVD deeper than the estimated top of the UG4 marker @ ~5925’ MD/4773’ TVD. Post-job Evaluation o MIT-T and CMIT-TxIA to 2500 psi o CBL to confirm the Top of Cement (TOC) Long-Term Integrity Monitoring o Biennial MIT-T and CMIT-TxIA o Monitor and Record WHPs daily IA Cement for PC/Tbg Leak Well: K-21 Procedural steps Slickline & Fullbore 1. MIT-T targeting 2500 psi and obtain LLR 2. Pull DGLV from 10200’ MD. MIT-T to same pressure obtained in step 1 and obtain LLR. 3. Pull PX plug from ~10337’ MD. 4. Set retrievable plug @ ~6600’ MD. 5. PT tubing to 2500 psi verify tubing integrity above 6600’ MD. 6. Pull retrievable plug. E-Line & Fullbore 1. Set 4-1/2” CBP @ ~10,235’ MD. 2. Pump diesel down the tubing while taking returns up the IA, to confirm circulation path through open pocket at GLM#1. 3. Set 4-1/2” cement retainer ~10,175’ MD Coiled Tubing 1. Sting into cement retainer. 2. Pump down CT: ¾115 bbls diesel (Freeze-protect for IA after the cement job is in place) ¾79 bbls 15.8 ppg Class G cement (5% excess of 7” x 4-1/2” volume from 6200’ – 10200’ MD: 75 BBLS) ¾Chase w/diesel 3. Mill out cement retainer, cement, and CBP. Slickline & Fullbore 1. Set PX plug at 10337’ MD. 2. CBL from ~10200’ MD to ~5000’ to identify TOC in IA. 3. Conduct AOGCC witnessed MIT-T and CMIT-TxIA to 2500 psi. Ensure 24-hour notice provided for AOGCC. 4. Pull PX plug if passing MITs obtained. 5. Set dreamcatcher if needed. E-Line/Slickline (Contingent) 1. If MIT-T above fails, set nipple reducer and plug at 10,337’ MD. 2. Set patch across Tubing leak @ ~6706’ MD. 3. Conduct AOGCC witnessed MIT-T to 2500 psi. 4. Pull plug from nipple reducer. 5. Set dreamcatcher if needed. Well Diagnostics & WIE 1. Update AKIMS and add biennial MIT-T and CMIT TxIA. Attachments: x Current Wellbore Schematic x Proposed Wellbore Schematic x Future P&A Wellbore Schematic x Sundry Change Form Email log to AOGCC. IA Cement for PC/Tbg Leak Well: K-21 IA Cement for PC/Tbg Leak Well: K-21 IA Cement for PC/Tbg Leak Well: K-21 Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: June 15, 2023Subject: Changes to Approved Sundry Procedure for Well S-17CSundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date